Transmission line capital costs  

SciTech Connect (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

2

Estimating SCR installation costs  

SciTech Connect (OSTI)

The EUCG surveyed 72 separate US installations of selective catalytic reduction (SCR) systems at coal-fired units totalling 41 GW of capacity to identify the systems' major cost drivers. The results, summarized in this article, provide excellent first-order estimates and guidance for utilities considering installing the downstream emissions-control technology. 4 figs., 1 tab.

Marano, M.; Sharp, G. [American Electric Power (United States)

2006-01-15T23:59:59.000Z

3

QGESS: Capital Cost Scaling Methodology  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(costs and values of inputs, outputs, and processes, including capital and operating costs) and performance (mass conversion, energy efficiency, and, generally speaking,...

4

Electric power substation capital costs  

SciTech Connect (OSTI)

The displacement or deferral of substation equipment is a key benefit associated with several technologies that are being developed with the support of the US Department of Energy`s Office of Utility Technologies. This could occur, for example, as a result of installing a distributed generating resource within an electricity distribution system. The objective of this study was to develop a model for preparing preliminary estimates of substation capital costs based on rudimentary conceptual design information. The model is intended to be used by energy systems analysts who need ``ballpark`` substation cost estimates to help establish the value of advanced utility technologies that result in the deferral or displacement of substation equipment. This cost-estimating model requires only minimal inputs. More detailed cost-estimating approaches are recommended when more detailed design information is available. The model was developed by collecting and evaluating approximately 20 sets of substation design and cost data from about 10 US sources, including federal power marketing agencies and private and public electric utilities. The model is principally based on data provided by one of these sources. Estimates prepared with the model were compared with estimated and actual costs for the data sets received from the other utilities. In general, good agreement (for conceptual level estimating) was found between estimates prepared with the cost-estimating model and those prepared by the individual utilities. Thus, the model was judged to be adequate for making preliminary estimates of typical substation costs for US utilities.

Dagle, J.E.; Brown, D.R.

1997-12-01T23:59:59.000Z

5

Best Practices for Controlling Capital Costs in Net Zero Energy...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

for Controlling Capital Costs in Net Zero Energy Design and Construction - 2014 BTO Peer Review Best Practices for Controlling Capital Costs in Net Zero Energy Design and...

6

Factors Affecting PMU Installation Costs (October 2014)  

Broader source: Energy.gov [DOE]

The Department of Energy investigated the major cost factors that affected PMU installation costs for the synchrophasor projects funded through the Recovery Act Smart Grid Programs. The data was compiled through interviews with the nine projects that deployed production grade synchrophasor systems.

7

Updated Capital Cost Estimates for Utility Scale Electricity  

E-Print Network [OSTI]

Updated Capital Cost Estimates for Utility Scale Electricity Generating Plants April 2013 Information Administration | Updated Capital Cost Estimates for Utility Scale Electricity Generating Plants ii for Utility Scale Electricity Generating Plants ii Contents Introduction

8

Accessing Low-Cost Capital Through Securitization (Poster), NREL...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

cost, time to access capital 3 Yr. DOE Award: Advanced Financing to Achieve SunShot Promote adoption by developers, financiers, law firms, etc. Organize the industry...

9

Cost of a Ride: The Effects of Densities on Fixed-Guideway Transit Ridership and Capital Costs  

E-Print Network [OSTI]

rail transit capital cost study update final. Washington,2005). Managing Capital Costs of Major Federally Fundedin US rail transit project cost overrun. Transportation

Guerra, Erick; Cervero, Robert

2010-01-01T23:59:59.000Z

10

Agency costs and efficiency of business capital investment: evidence from quarterly capital expenditures  

Science Journals Connector (OSTI)

Using the quarterly Compustat files, we present empirical findings that business capital investment is significantly higher in the fourth quarter than in other quarters. Even after controlling for business capital investment determinants, we find that the fourth quarter capital investment is significantly larger but less sensitive to investment opportunities than other quarters' capital investment. This phenomenon is more evident for firms with larger cash holdings than for firms with smaller cash holdings, for larger firms than for smaller firms, and for diversified firms than for stand-alone firms. Our findings suggest a high level of agency costs in corporate investment decisions.

Hyun-Han Shin; Yong H. Kim

2002-01-01T23:59:59.000Z

11

When Does Information Asymmetry Affect the Cost of Capital?  

E-Print Network [OSTI]

This paper examines when information asymmetry among investors affects the cost of capital in excess of standard risk factors. When equity markets are perfectly competitive, information asymmetry has no separate effect on ...

Armstrong, Christopher S.

12

Discrete Event Modeling of Algae Cultivation and Harvesting at Commercial Scale: Capital Costs, Operating Costs, and System Bottlenecks  

SciTech Connect (OSTI)

Discrete Event Modeling of Algae Cultivation and Harvesting at Commercial Scale: Capital Costs, Operating Costs, and System Bottlenecks

Lacey, Ph.D, P.E., Ronald E. [Texas A& M University

2012-07-16T23:59:59.000Z

13

Updated Capital Cost Estimates for Utility Scale Electricity Generating Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Updated Capital Cost Estimates Updated Capital Cost Estimates for Utility Scale Electricity Generating Plants April 2013 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 U.S. Energy Information Administration | Updated Capital Cost Estimates for Utility Scale Electricity Generating Plants ii This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this report therefore should not be construed as representing those of the Department of Energy or other Federal agencies.

14

CAPITAL AND OPERATING COST OF HYDROGEN PRODUCTION FROM COAL GASIFICATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CAPITAL AND OPERATING COST OF HYDROGEN CAPITAL AND OPERATING COST OF HYDROGEN PRODUCTION FROM COAL GASIFICATION Final Report April 2003 Prepared for: The United States Department of Energy National Energy Technology Laboratory (NETL) under: Contract No. DE-AM26-99FT40465 between the NETL and Concurrent Technologies Corporation (CTC) Subcontract No. 990700362 between CTC and Parsons Infrastructure & Technology Group Inc. Task 50611 DOE Task Managers: James R. Longanbach Gary J. Stiegel Parsons Project Manager: Michael D. Rutkowski Principal Investigators: Thomas L. Buchanan Michael G. Klett Ronald L. Schoff PARSONS Capital and Operating Cost of Hydrogen Production from Coal Gasification Page i April 2003 TABLE OF CONTENTS Section Title Page List of Tables iii List of Figures iii

15

Design approaches to achieve competitive LMFBR capital costs  

SciTech Connect (OSTI)

Through analysis of the essential functional elements of an LMFBR, numerous ways were found to simplify system design, reduce the size of components and equipment, and eliminate some components and systems. The projected capital cost per net kW of this design is competitive with that of current PWRs. RandD programs and the construction and operation of CRBRP now are needed to prove out the features of this new design.

Arnold, W.H.; Ehrman, C.S.; Sharbaugh, J.E.; Young, W.H.

1982-09-01T23:59:59.000Z

16

Some Observations on Energy Efficiency and Capital Cost  

E-Print Network [OSTI]

SO~ffi OBSERVATIONS ON ENERGY EFFICIENCY AND CAPITAL COST William F. Kenney Exxon Chemical Company Florham Park, ABSTRACT The usual expectation in the process indus tries is that improved energy efficiency requires increased investment..., ACS Symposium Series ~. (3) Exxon Chemical Internal Studies. ACKNOWLEDGEMENT The author is grateful to Exxon Chemical for permission to publish this study. Particular thanks go to A. P. Durso and W. J. O'Brien of the Central Engineering...

Kenney, W. F.

1982-01-01T23:59:59.000Z

17

FACILITIES ENGINEER WEST CHICAGO Execute capital projects for manufacturing facilities and utilities systems: scope development, cost  

E-Print Network [OSTI]

facilities and utilities systems: scope development, cost estimation, system design, equipment sizing ENGINEERING: Lead capital project design, development and execution for facility and utility capital Utilities systems (Vacuum, Hydraulics, Waste Water treatment, etc.) o Buildings and grounds, including

Heller, Barbara

18

Accessing Low-Cost Capital Through Securitization (Poster)  

SciTech Connect (OSTI)

Poster for Solar Power International conference presents information on NREL's effort to open capital markets through securitization via Solar Access to Public Capital (SAPC) working group's efforts.

Mendelsohn, M.

2014-10-01T23:59:59.000Z

19

Evaluating capital and operating cost efficiency of offshore wind farms: A DEA approach  

Science Journals Connector (OSTI)

Abstract An actual growth rate greater than 30% indicates that offshore wind is a reasonable alternative to other energy sources. The industry today is faced with the challenge of becoming competitive and thus significantly reduce the cost of electricity from offshore wind. This situation implies that the evaluation of costs incurred during development, installation and operation is one of the most pressing issues in this industry at the moment. Unfortunately, actual cost analyses suffer from less resilient input data and the application of simple methodologies. Therefore, the objective of this study was to elevate the discussion, providing stakeholders with a sophisticated methodology and representative benchmark figures. The use of Data Envelopment Analysis (DEA) allowed for plants to be modelled as entities and costs to be related to the main specifics, such as distance to shore and water depth, ensuring the necessary comparability. Moreover, a particularly reliable database was established using cost data from annual reports. Offshore wind capacity of 3.6GW was benchmarked regarding capital and operating cost efficiency, best-practice cost frontiers were determined, and the effects of learning-by-doing and economies of scale were investigated, ensuring that this article is of significant interest for the offshore wind industry.

Nikolaus Ederer

2015-01-01T23:59:59.000Z

20

A capital cost comparison of commercial ground-source heat pump systems  

SciTech Connect (OSTI)

The report provides a capital cost comparison of commercial ground source heat pump systems. The study includes groundwater systems, ground-coupled systems and hybrid systems.

Rafferty, K.

1994-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "installed capital cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009  

E-Print Network [OSTI]

from 1998-2009 Tracking the Sun III: The Installed Cost ofSystems MW Total Tracking the Sun III: The Installed Cost ofthrough 2009. Tracking the Sun III: The Installed Cost of

Barbose, Galen

2011-01-01T23:59:59.000Z

22

Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007  

E-Print Network [OSTI]

The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-

Wiser, Ryan

2009-01-01T23:59:59.000Z

23

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009  

E-Print Network [OSTI]

The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-

Barbose, Galen

2011-01-01T23:59:59.000Z

24

Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008  

E-Print Network [OSTI]

The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-

Barbose, Galen L

2010-01-01T23:59:59.000Z

25

Table 1. Updated estimates of power plant capital and operating costs  

U.S. Energy Information Administration (EIA) Indexed Site

Updated estimates of power plant capital and operating costs" Updated estimates of power plant capital and operating costs" ,"Plant Characteristics",,,"Plant Costs (2012$)" ,"Nominal Capacity (MW)","Heat Rate (Btu/kWh)",,"Overnight Capital Cost ($/kW)","Fixed O&M Cost ($/kW-yr)","Variable O&M Cost ($/MWh)" ,,,,,,,"NEMS Input" " Coal" "Single Unit Advanced PC",650,8800,,3246,37.8,4.47,"N" "Dual Unit Advanced PC",1300,8800,,2934,31.18,4.47,"Y" "Single Unit Advanced PC with CCS",650,12000,,5227,80.53,9.51,"Y" "Dual Unit Advanced PC with CCS",1300,12000,,4724,66.43,9.51,"N" "Single Unit IGCC ",600,8700,,4400,62.25,7.22,"N"

26

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009  

E-Print Network [OSTI]

Investigation of Photovoltaic Cost Trends in California.photovoltaic (PV) systems has increased, so too has the desire to track the installed costPhotovoltaic Power Systems. Figure 13. Comparison of Average Installed Costs (

Barbose, Galen

2011-01-01T23:59:59.000Z

27

Tracking the Sun III The Installed Cost of Photovoltaics in the U.S. from  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tracking the Sun III The Installed Cost of Photovoltaics in the U.S. from Tracking the Sun III The Installed Cost of Photovoltaics in the U.S. from 1998-2009 Title Tracking the Sun III The Installed Cost of Photovoltaics in the U.S. from 1998-2009 Publication Type Report Refereed Designation Unknown Year of Publication 2010 Authors Barbose, Galen L., Naïm Darghouth, and Ryan H. Wiser Pagination 54 Date Published 12/2010 Publisher LBNL City Berkeley Keywords distributed energy resources (der), electricity markets and policy group, energy analysis and environmental impacts department, energy markets, photovoltaics Abstract As the deployment of grid-connected solar photovoltaic (PV) systems has increased, so too has the desire to track the installed cost of these systems over time and by location, customer type, system characteristics, and component. This report helps to fill this need by summarizing trends in the installed cost1 of grid-connected PV systems in the United States from 1998 through 2009 (updating two previous reports with data through 2007 and 2008, respectively), and providing preliminary cost trends for systems installed in 2010. The analysis is based on installed cost data for approximately 78,000 residential and non-residential PV systems, totaling 874 megawatts (MW) and representing 70% of all grid-connected PV capacity installed in the United States through 2009.

28

Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Sun: The Installed Cost of Photovoltaics in the U.S. from Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007 Title Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007 Publication Type Report Refereed Designation Unknown Year of Publication 2009 Authors Wiser, Ryan H., Galen L. Barbose, and Carla Peterman Pagination 42 Date Published 02/2009 Publisher LBNL City Berkeley Keywords electricity markets and policy group, energy analysis and environmental impacts department, photovoltaics, power system economics, renewable energy Abstract As installations of grid-connected solar photovoltaic (PV) systems have grown, so too has the desire to track the installed cost of these systems over time, by system characteristics, by system location, and by component. This report helps to fill this need by summarizing trends in the installed cost of grid-connected PV systems in the United States from 1998 through 2007. The report is based on an analysis of installed cost data from nearly 37,000 residential and non-residential PV systems, totaling 363 MW of capacity, and representing 76% of all grid-connected PV capacity installed in the U.S. through 2007.

29

Does Corporate Social Responsibility Affect the Cost of Capital? * Sadok El Ghoul  

E-Print Network [OSTI]

the effect of corporate social responsibility (CSR) on the cost of equity capital for a large sample of U in improving responsible employee relations, environmental policies, and product strategies contributes" industries, namely, tobacco and nuclear power, increases firms' cost of equity. These findings support

Saskatchewan, University of

30

Tracking the Sun II The Installed Cost of Photovoltaics in the U.S. from  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tracking the Sun II The Installed Cost of Photovoltaics in the U.S. from Tracking the Sun II The Installed Cost of Photovoltaics in the U.S. from 1998-2008 Title Tracking the Sun II The Installed Cost of Photovoltaics in the U.S. from 1998-2008 Publication Type Report Refereed Designation Unknown Year of Publication 2009 Authors Wiser, Ryan H., Galen L. Barbose, Carla Peterman, and Naïm Darghouth Pagination 150 Date Published 10/2009 Publisher LBNL City Berkeley Keywords electricity markets and policy group, energy analysis and environmental impacts department, photovoltaics, power system economics, renewable energy Abstract As the deployment of grid-connected solar photovoltaic (PV) systems has increased, so too has the desire to track the installed cost of these systems over time and by location, customer type, system characteristics, and component. This report helps to fill this need by summarizing trends in the installed cost of grid-connected PV systems in the United States from 1998 through 2008 (updating a previous report with data through 2007). The analysis is based on installed cost data from more than 52,000 residential and non-residential PV systems, totaling 566 MW and representing 71% of all grid-connected PV capacity installed in the U.S. through 2008.

31

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

E-Print Network [OSTI]

Annual Report on U.S. Wind Power Installation, Cost, and3 U.S. Wind Power Capacity Increased by 27% inAre Significant. . . . . . . 9 Wind Power Prices Are Up in

2008-01-01T23:59:59.000Z

32

Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007  

E-Print Network [OSTI]

10-100 kW >100 kW Tracking the Sun: The Installed Cost ofout over five years. Tracking the Sun: The Installed Cost ofU.S. from 1998-2007 Tracking the Sun: The Installed Cost of

Wiser, Ryan

2009-01-01T23:59:59.000Z

33

Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008  

E-Print Network [OSTI]

2008 BACK PAGE Tracking the Sun II: The Installed Cost of10-100 kW >100 kW Tracking the Sun II: The Installed Cost ofSystems MW Total Tracking the Sun II: The Installed Cost of

Barbose, Galen L

2010-01-01T23:59:59.000Z

34

Using Pinch Technology to Explore Trade-Offs Between Energy Cost, Capital Cost, Process Modifications, and Utility Selection  

E-Print Network [OSTI]

USING PINCH TECHNOLOGY TO EXPLORE TRADE-OFFS BETWEEN ENERGY COST, CAPITAL COST, PROCESS MODIFICATIONS, AND UTILITY SELECTION A.S. McMullan, Consultant and H.D. Spriggs, President Linnhoff March, Inc., Leesburg, Virginia ABSTRACT Process... (3), predict payback targets in retrofit situations (4), and design flexible heat exchanger networks (5). The most recent developments enable the process designer to explore the interactions and trade-offs between design variables, prior...

McMullan, A. S.

35

Rail costs and capital adjustments in a quasi regulated environment  

E-Print Network [OSTI]

This paper reports on results obtained from the estimation of a rail cost function using a pooled-time series, cross section of Class I railroads for the period 1974-1986. An analysis is performed of short-run and long-run ...

Friedlaender, Ann Fetter

1991-01-01T23:59:59.000Z

36

Controlling Capital Costs in High Performance Office Buildings: A Review of Best Practices for Overcoming Cost Barriers  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Controlling Capital Costs in Controlling Capital Costs in High Performance Office Buildings: A Review of Best Practices for Overcoming Cost Barriers Preprint Shanti Pless and Paul Torcellini To be presented at the ACEEE Summer Study on Energy Efficiency in Buildings Pacific Grove, California August 12-17, 2012 Conference Paper NREL/CP-5500-55264 May 2012 NOTICE The submitted manuscript has been offered by an employee of the Alliance for Sustainable Energy, LLC (Alliance), a contractor of the US Government under Contract No. DE-AC36-08GO28308. Accordingly, the US Government and Alliance retain a nonexclusive royalty-free license to publish or reproduce the published form of this contribution, or allow others to do so, for US Government purposes. This report was prepared as an account of work sponsored by an agency of the United States government.

37

Tracking the Sun IV: An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010  

E-Print Network [OSTI]

The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-

Darghouth, Naim

2012-01-01T23:59:59.000Z

38

Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008  

E-Print Network [OSTI]

Investigation of Photovoltaic Cost Trends in California,Investigation of Photovoltaic Cost Trends in California.photovoltaic (PV) systems have grown in number, so too has the desire to track the installed cost

Barbose, Galen L

2010-01-01T23:59:59.000Z

39

Valuing Rail Transit: Comparing Capital and Operating Costs to Consumer Benefits  

E-Print Network [OSTI]

sources, and capital expenditures by mode and transit agencyat the detailed capital expenditures of 19 light rail and 17of 2009-adjusted capital expenditure data from the NTD.

Guerra, Erick

2010-01-01T23:59:59.000Z

40

Capital, labor, and energy cost prediction in timber harvesting: a microcomputer solution  

E-Print Network [OSTI]

, and rates for taxes, insurance, and interest. In case of an error or change in the input figures, included in the program is a handy error correction routine. Figure 2 The Programs Chained to Form CAPLEN CAPLEN MENU/CMP LABOR/CMP ENERGY/CMP CAPITAL/CMP... SUMMARY/CMP HARDCOPY/CMP END CAPLEN-Introduction and Directions, MENU/CMP-Allows access to linked programs. LABOR/CMP-Calculates labor and fringe benefit costs in harvest system. ENERGY/CMp-predicts, statistically, the energy requirements and cost...

Kusmertz, Timothy Jon

2012-06-07T23:59:59.000Z

Note: This page contains sample records for the topic "installed capital cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

Wind Powering America (EERE)

  Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 006 Contents Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 U.S. Wind Power Capacity Increased by 7% in 006 . . . . . . . . . . . . . . . .4 The United States Leads the World in Annual Capacity Growth . . . . . . . .4 Texas, Washington, and California Lead the U.S. in Annual Capacity Growth . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 GE Wind Is the Dominant Turbine Manufacturer, with Siemens Gaining Market Share . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 Average Turbine Size Continues to Increase . . . . . . . . . . . . . . . . . . . . . . .7 Developer Consolidation Accelerates . . . . . . . . . . . . . . . . . . . . . . . . . . . .8 Innovation and Competition in Non-Utility Wind Financing Persists . . . .9

42

The impact of implied facilities cost of money subsidies on capital expenditures and the cost of debt in the defense industry  

Science Journals Connector (OSTI)

We examine the public policy effects of a cash flow subsidy unique to the government contracting industry, on defense contractors capital expenditures and cost of debt over a relatively long time-period, 19782009. Because the Department of Defense found evidence of a shrinking defense industrial base in the early 1970s, it wanted to encourage capital spending by defense firms. The result was a cost accounting standard that reimbursed contractors for an imputed facilities capital cost of money (FCCOM) that has remained in effect, virtually unchanged, for almost 30years, despite structural changes in the defense industry. Our results, using a sample of 628 defense firms, suggest that the standard met its intended objective of increased capital spending within 10years of its promulgation. However, we also find that the FCCOM subsidy may have contributed to a decreased cost of debt within the defense sector over the long-term. Finally, further analyses indicate that the long-term persistence of this subsidy may have encouraged defense contractors to overinvest in capital goods. Our findings suggest that public policy makers should consider both direct and indirect effects of regulation embedded in accounting standards.

Carolyn M. Callahan; Valaria P. Vendrzyk; Maureen G. Butler

2012-01-01T23:59:59.000Z

43

Objectivity or advocacy: probability theory and capital costing at the Bell System  

Science Journals Connector (OSTI)

This paper investigates the Bell Telephone System's blending of depreciation knowledge and probability theory in order to control debate before government regulators in the early 1900s. By combining statistics and accounting, Bell created a system for estimating capital cost expiration firmly grounded in mathematical science, developing methodologies which used averaging techniques to determine trends in asset life obscured by random fluctuations in actual retirements. Concurrently, complexity derived from the application of probability theory gave the telephone company significant advantages in regulatory debates. The advanced mathematics employed formed a knowledge barrier, inhibiting potential encroachments by regulators on corporate prerogatives. This study expands our understanding of the acquisition and use of knowledge within the firm by investigating advocacy's role in the development of depreciation accounting. As depreciation knowledge spread beyond Bell, regulators examined equity issues related to the firm's depreciation practices, resulting in some relatively minor changes to Bell's depreciation policies.

Deirdre M. Collier

2012-01-01T23:59:59.000Z

44

ESS 2012 Peer Review - Estimation of Capital and Levelized Cost for Redox Flow Batteries - Vilayanur Viswanathan, PNNL  

Broader source: Energy.gov (indexed) [DOE]

Estimation of Capital and Levelized Estimation of Capital and Levelized Cost for Redox Flow Batteries V. Viswanathan, A. Crawford, L. Thaller 1 , D. Stephenson, S. Kim, W. Wang, G. Coffey, P. Balducci, Z. Gary Yang 2 , Liyu Li 2 , M. Kintner-Meyer, V. Sprenkle 1 Consultant 2 UniEnergy Technology September 28, 2012 USDOE-OE ESS Peer Review Washington, DC Dr. Imre Gyuk - Energy Storage Program Manager, Office of Electricity Delivery and Energy Reliability 1 What are we trying to accomplish? PNNL grid analytics team has established ESS cost targets for various applications PNNL cost/performance model estimates cost for redox flow battery systems of various chemistries drives research internally to focus on most important components/parameters/metrics for cost reduction and performance improvement

45

Preliminary design and estimate of capital and operating costs for a production scale application of laser decontamination technology  

SciTech Connect (OSTI)

The application of laser ablation technology to the decontamination of radioactive metals, particularly the surfaces of equipment, is discussed. Included is information related to the design, capital and operating costs, and effectiveness of laser ablation technology, based on commercial excimer and Nd:YAG lasers, for the decontamination of production scale equipment.

Pang, Ho-ming; Edelson, M.C.

1994-08-06T23:59:59.000Z

46

An Assessment of the Near-Term Costs of Hydrogen Refueling Stations and Station Components  

E-Print Network [OSTI]

3-7: Booster Compressor Costs 3.5 Hydrogen PurificationkWh/kg includes compressor) Capital Costs Hydrogen EquipmentHydrogen Equipment Purifier Storage System Compressor Dispenser Additional Equipment Installation Costs

Weinert, Jonathan X.; Lipman, Timothy

2006-01-01T23:59:59.000Z

47

Microsoft Word - QGESS_CapitalCostScalingMethodology_Final_20130201.docx  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 3 Q Q U U A A L L I I T T Y Y G G U U I I D D E E L L I I N N E E S S F F O O R R E E N N E E R R G G Y Y S S Y Y S S T T E E M M S S T T U U D D I I E E S S C C a a p p i i t t a a l l C C o o s s t t S S c c a a l l i i n n g g M M e e t t h h o o d d o o l l o o g g y y DOE/NETL-2010/???? DOE/NETL-341/013113 ii Capital Cost Scaling Methodology Quality Guidelines for Energy Systems Studies January 2013 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights.

48

NREL: Energy Analysis - Distributed Generation Energy Technology Capital  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Capital Costs Capital Costs Transparent Cost Database Button The following charts indicate recent capital cost estimates for distributed generation (DG) renewable energy technologies. The estimates are shown in dollars per installed kilowatt of generating capacity or thermal energy capacity for thermal technologies. The charts provide a compilation of available national-level cost data from a variety of sources. Costs in your specific location will vary. The red horizontal lines represent the first standard deviation of the mean. The U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) sponsored the distributed generation data used within these charts. If you are seeking utility-scale technology capital cost estimates, please visit the Transparent Cost Database website for NREL's information

49

Energy Conservation Installation Credit | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Energy Conservation Installation Credit Energy Conservation Installation Credit Energy Conservation Installation Credit < Back Eligibility Multi-Family Residential Residential Savings Category Heating & Cooling Commercial Heating & Cooling Heating Home Weatherization Commercial Weatherization Sealing Your Home Cooling Design & Remodeling Windows, Doors, & Skylights Ventilation Heat Pumps Appliances & Electronics Commercial Lighting Lighting Water Heating Maximum Rebate 500 per individual; up to 1,000 for a married couple filing jointly Program Info State Montana Program Type Personal Tax Credit Rebate Amount 25% of cost of capital investment Provider Montana Department of Revenue Individual taxpayers may claim a credit against their tax liability for up to 25% of the costs of investment for energy conservation purposes in a

50

Cost of capital estimation for energy efficiency projects through a cash flow beta approach  

Science Journals Connector (OSTI)

This paper presents a methodological framework for project beta estimation according to the Capital Asset Pricing Model (CAPM) when relevant ... monthly residential retail price data for electricity, natural gas,...

Gyrgy Andor; Marcell Dlk

2014-09-01T23:59:59.000Z

51

Feasibility Studies to Improve Plant Availability and Reduce Total Installed Cost in Integrated Gasification Combined Cycle Plants  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Feasibility Studies to Improve Plant Feasibility Studies to Improve Plant Availability and Reduce Total Installed Cost in Integrated Gasification Combined Cycle Plants Background Gasification provides the means to turn coal and other carbonaceous solid, liquid and gaseous feedstocks as diverse as refinery residues, biomass, and black liquor into synthesis gas and valuable byproducts that can be used to produce low-emissions power, clean-burning fuels and a wide range of commercial products to support

52

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

E-Print Network [OSTI]

Cost ($/MWh) Regulation Load Following Unit Commitment Gas31 Regulation and load-following impacts are generally found

2008-01-01T23:59:59.000Z

53

Development of a Preliminary Decommissioning Plan Following the International Structure for Decommissioning Costing (ISDC) of Nuclear Installations - 13361  

SciTech Connect (OSTI)

The International Structure for Decommissioning Costing (ISDC) of Nuclear Installations, published by OECD/NEA, IAEA and EC is intended to provide a uniform list of cost items for decommissioning projects and provides a standard format that permits international cost estimates to be compared. Candesco and DECOM have used the ISDC format along with two costing codes, OMEGA and ISDCEX, developed from the ISDC by DECOM, in three projects: the development of a preliminary decommissioning plan for a multi-unit CANDU nuclear power station, updating the preliminary decommissioning cost estimates for a prototype CANDU nuclear power station and benchmarking the cost estimates for CANDU against the cost estimates for other reactor types. It was found that the ISDC format provides a well defined and transparent basis for decommissioning planning and cost estimating that assists in identifying gaps and weaknesses and facilitates the benchmarking against international experience. The use of the ISDC can also help build stakeholder confidence in the reliability of the plans and estimates and the adequacy of decommissioning funding. (authors)

Moshonas Cole, Katherine; Dinner, Julia; Grey, Mike [Candesco - A Division of Kinectrics Inc, 26 Wellington E 3rd floor, Toronto, Ontario, M5E 1S2 (Canada)] [Candesco - A Division of Kinectrics Inc, 26 Wellington E 3rd floor, Toronto, Ontario, M5E 1S2 (Canada); Daniska, Vladimir [DECOM a.s., Sibirska 1, 917 01 Trnava (Slovakia)] [DECOM a.s., Sibirska 1, 917 01 Trnava (Slovakia)

2013-07-01T23:59:59.000Z

54

Optimization of financial and energy structure of productive capital  

Science Journals Connector (OSTI)

......where the specific energy consumption is introduced...independent of the capital cost because different...various types of energy sources (renewable, non-traditional...5) without the energy factor was studied...the non-linear costs of installing new......

N. Hritonenko; Y. Yatsenko

2006-07-01T23:59:59.000Z

55

Minimization of Transportation, Installation and Maintenance Operations Costs for Offshore Wind Turbines.  

E-Print Network [OSTI]

??Although it is a sustainable source and there is abundant potential for energy, cost of energy generated from offshore wind is still high compared to (more)

Faiz, Tasnim Ibn

2014-01-01T23:59:59.000Z

56

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

E-Print Network [OSTI]

Results from Major Wind Integration Studies Completed 2003-a mini- mum) show that wind integration costs are generallyA number of additional wind integration analyses are planned

2008-01-01T23:59:59.000Z

57

10 MWe Solar Thermal Central Receiver Pilot Plant Total Capital Cost  

Science Journals Connector (OSTI)

A cost analysis of the 10MWe Solar One Thermal Central Receiver Plant near Barstow, California, ... is presented to help predict costs of future solar thermal central receiver plants. In this paper, the Solar One...

H. F. Norris

1985-01-01T23:59:59.000Z

58

Tracking the Sun IV: An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tracking Tracking the Sun IV Tracking the Sun IV An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010 Photovoltaics in the United States from 1998 to 2010 Galen Barbose, Naïm Darghouth, Ryan Wiser, and Joachim Seel g y Lawrence Berkeley National Laboratory - Report Summary - p y September 2011 Environmental Energy Technologies Division * Energy Analysis Department Thanks to the U.S. DOE's Solar Energy Technologies Program and the Clean Energy States Alliance for supporting this work Project Overview Objective: Using project-level data, evaluate trends in the installed cost of grid-connected PV systems throughout the United States: g y g * Changes in total system installed cost and component-level costs over time * Variation in total installed cost by system size

59

Life cycle cost analysis of three renewed street lighting installations in Finland  

Science Journals Connector (OSTI)

The goal of the LCC study is to compare the costs occurring during ... to proof whether it is economic to update streetlights from HPM lamps and to assess the effect of LED technology development on LCCs in diffe...

Leena Thkm; Anne Ylinen

2012-02-01T23:59:59.000Z

60

Cost modeling and evaluation of capital expenditures in optical multilayer networks  

Science Journals Connector (OSTI)

Optical multilayer networks offer a high degree of freedom in network design, adapting to actual network requirements (demand types, topologies, etc.) and achieving cost-efficient...

Huelsermann, Ralf; Gunkel, Matthias; Meusburger, Clara; Schupke, Dominic A

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "installed capital cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Rail costs and capital adjustments in a quasi-regulated environment  

E-Print Network [OSTI]

This paper reports on results obtained from estimation of a rail cost function using a pooled time-series cross section of Class I U.S. railroads for the period 1973-1986. Based on the results of this cost function, an ...

Friedlaender, Ann Fetter

1990-01-01T23:59:59.000Z

62

How Credit Market Conditions Impact the Effect of Voluntary Disclosure on Firms' Cost of Debt Capital  

E-Print Network [OSTI]

(abundant) suggesting that they value voluntary disclosure from borrowers differentially across credit market regimes. I draw upon the economic and finance literature on credit rationing to test whether the effects of voluntary disclosure on firms' cost...

Scott, Bret

2012-10-19T23:59:59.000Z

63

Reducing Energy Costs And Minimizing Capital Requirements: Case Studies of Thermal Energy Storage (TES)  

E-Print Network [OSTI]

, and thus during those times when power has its highest cost or value. Thermal Energy Storage (TES) provides a means of de-coupling the generation of cooling from the provision of cooling to the peak cooling loads. In this manner, peak power demand...

Andrepont, J. S.

2007-01-01T23:59:59.000Z

64

Help for Working Capital  

Science Journals Connector (OSTI)

Help for Working Capital ... It takes a sharp pencil to figure out ways and means of all eviating the constant pressure for new money for capital expenditure needed by our steadily expanding industry ... These funds not only must now absorb higher operating costs, but also must be counted upon heavily for capital expenditure as well. ...

HARRIS MCASHAN

1950-12-18T23:59:59.000Z

65

Tracking the Sun IV: An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

IV IV An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010 Galen Barbose Naïm Darghouth Ryan Wiser Joachim Seel September 2011 Tracking the Sun IV Contents An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010 Environmental Energy Technologies Division, Lawrence Berkeley National Laboratory Primary Authors: Galen Barbose, Naïm Darghouth, Ryan Wiser, and Joachim Seel Executive Summary ...................................................................................................... 1 1. Introduction .............................................................................................................. 5 2. Data Summary .......................................................................................................... 8

66

Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007  

E-Print Network [OSTI]

Investigation of Photovoltaic Cost Trends in California.Investigation of Photovoltaic Cost Trends in California,Investigation of Photovoltaic Cost Trends in California.

Wiser, Ryan

2009-01-01T23:59:59.000Z

67

Telecommunications Frontier Client Installation  

E-Print Network [OSTI]

Telecommunications Frontier Client Installation 1. Fax the completed form to 979.847.1111. 2 Signature Date Telecommunications Office Use Only Service Due Date: Installation Cost: Billed To: Print Form

68

Types of Costs Types of Cost Estimates  

E-Print Network [OSTI]

first cost or capital investment): ­ Expenditures made to acquire or develop capital assets ­ Three main· Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408: Mining-site management or corporate level expenditure · Direct vs. Indirect Costs ­ Direct (or variable) costs apply

Boisvert, Jeff

69

Types of Costs Types of Cost Estimates  

E-Print Network [OSTI]

-Revenue Relationships · Capital Costs (or first cost or capital investment): ­ Expenditures made to acquire or develop05-1 · Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408 ­ off-site management or corporate level expenditure · Direct vs. Indirect Costs ­ Direct (or variable

Boisvert, Jeff

70

Capital structure choices  

Science Journals Connector (OSTI)

Corporate finance theory provides a number of competing hypotheses for explaining the capital structure choice of firms. The major ones are the 'trade-off' theory, which hypothesises an optimal combination of debt and equity capital, and the 'pecking-order' theory, which suggests a ranking order between different types of capital making a firm's capital structure an aggregated result of successive financial decisions. Previous studies find evidence both supporting and contradicting the two theories. We examine the role and importance of different firm characteristics as well as to what extent managers in Swedish firms make capital structure choices in accordance with the theories and are affected by concepts like optimal capital structure, financial hierarchy, windows of opportunity, signalling, asymmetric information and flexibility. Our conclusion is that capital structure choices are built on a balancing notion suggesting a revised trade-off theory or alternatively an extended pecking order theory also incorporating agency costs and signalling.

Ted Lindblom; Gert Sandahl; Stefan Sjogren

2011-01-01T23:59:59.000Z

71

HIGH SPEED RAIL COSTS, BENEFITS, AND FINANCING RAYMOND H. ELLIS  

E-Print Network [OSTI]

Incremental Capital Cost Capital Cost Year of (Billions (Billions Completion Expenditure Section 2010$) 2010 YEAR OF EXPENDITURE CAPITAL DOLLARS CUMULATIVE YEAR OF EXPENDITURE CAPITAL COST INITIAL CONST$) of Section Capital Cost #12;CALIFORNIA HIGH SPEED RAIL PHASE 1 CAPITAL COSTS SECTION INCREMENTAL CAPITAL

Bustamante, Fabián E.

72

Benchmarking Non-Hardware Balance of System (Soft) Costs for U.S. Photovoltaic Systems Using a Data-Driven Analysis from PV Installer Survey Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Non-Hardware Non-Hardware Balance of System (Soft) Costs for U.S. Photovoltaic Systems Using a Data-Driven Analysis from PV Installer Survey Results November 2012 Benchmarking Non-Hardware Balance of System (Soft) Costs for U.S. Photovoltaic Systems Using a Data-Driven Analysis from PV Installer Survey Results NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Contract No. DE-AC36-08GO28308 LBNL's work was supported by the U.S. Department of Energy SunShot program under Contract No. DE-AC02-05CH11231 Technical Report DOE/GO-10212-3834 * November 2012 National Renewable Energy Laboratory 15013 Denver West Parkway

73

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009  

E-Print Network [OSTI]

within the sample (e.g. , rack-mounted, building-integrated,building-integrated vs. rack-mounted, crystalline siliconClosed the Cost Gap with Rack-Mounted PV in New Construction

Barbose, Galen

2011-01-01T23:59:59.000Z

74

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009  

E-Print Network [OSTI]

Incentive Programs (AEP, Entergy, Oncor, SWEPCO, TNMP) RERCIncentive TX Programs (AEP, Entergy, 10-100 kW Avg. CostIncentive Programs (AEP, Entergy, Oncor, SWEPCO, TNMP) VT

Barbose, Galen

2011-01-01T23:59:59.000Z

75

Advertising Installation Rates (rates include printing costs) Ads can be purchased at two-week or monthly intervals. Clients can request to have ads removed before the end of the scheduled display dates; however, clients  

E-Print Network [OSTI]

Advertising Installation Rates (rates include printing costs) Ads can be purchased at two are responsible for designing all advertisements. Approved ads must be 11 inches high and 17 inches wide. Allow Services will print, install and remove all ads. Submission Complete an advertising request form

Bennett, Gisele

76

Best Practices for Controlling Capital Costs in Net Zero Energy Design and Construction- 2014 BTO Peer Review  

Broader source: Energy.gov [DOE]

Presenter: Shanti Pless, National Renewable Energy Laboratory For net zero energy (NZE) building performance to become the norm in new commercial construction, it is necessary to demonstrate that NZE can be achieved cost effectively.

77

Capital and revenue expenditures  

E-Print Network [OSTI]

T and Charaoteristios of Various Expenditures ~ ~ 7 III. Bases for Expenditure Classifioationi ~ ~ ~ ~ ~ ~ ~ ~ r ~ ' ~ IV ~ Methods of kooountiag for Capital and Revenue Expenditure( ~ ~ I CkPITLL ERE RKVRRUm bXPLM)ITURkiS ISTRORUGTIOR kn ?ttonpt will be made... whish represent part of the nooessary cost of usine the asset during the current period, shouLd be oharged abainst the revenue of the period? heveaue expenditures are expensosg capital expenditures are noti fhe toras aooounting period' and "fiscal...

Owens, Jack Bailey

2012-06-07T23:59:59.000Z

78

Telecommunications Keyless Entry Hardware Install  

E-Print Network [OSTI]

Telecommunications Keyless Entry Hardware Install 1. Fax completed form to 979.847.1111. 2. If you Telecommunications Office Use Only Service Due Date: Installation Cost: Billed To: Print Form #12;

79

Operating Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

1997-03-28T23:59:59.000Z

80

Heliostat cost-analysis tool  

SciTech Connect (OSTI)

Estimated production costs of solar energy systems serve as guides for future component development and as measures of the potential economic viability of the technologies. The analysis of heliostat costs is particularly important since the heliostat field is the largest cost component of a solar central receiver plant. A heliostat cost analysis tool (HELCAT) that processes manufacturing, transportation, and installation cost data has been developed to provide a consistent structure for cost analyses. HELCAT calculates a representative product price based on direct input data (e.g. direct materials, direct labor, capital requirements) and various economic, financial, and accounting assumptions. The characteristics of this tool and its initial application in the evaluation of second generation heliostat cost estimates are discussed. A set of nominal economic and financial parameters is also suggested.

Brandt, L.D.; Chang, R.E.

1981-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "installed capital cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Factors Affecting PMU Installation Costs  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

of conditions throughout the grid in real time. 1 These parameters represent the "heart-beat" and health of the power system. Voltage and current are parameters...

82

American Capital Energy Inc | Open Energy Information  

Open Energy Info (EERE)

Product: Full-service PV installation company, which provides advisory services on PV plants and O&M services. References: American Capital Energy Inc1 This article is a...

83

SunShot Initiative: Access to Capital  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Access to Capital to someone by Access to Capital to someone by E-mail Share SunShot Initiative: Access to Capital on Facebook Tweet about SunShot Initiative: Access to Capital on Twitter Bookmark SunShot Initiative: Access to Capital on Google Bookmark SunShot Initiative: Access to Capital on Delicious Rank SunShot Initiative: Access to Capital on Digg Find More places to share SunShot Initiative: Access to Capital on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Balance of Systems Reducing Non-Hardware Costs Lowering Barriers Fostering Growth Access to Capital Photo of a room full of people seated in rows with a few standing in the background. Two hands in the crowd are holding up sheets of paper with 'Like'. Participants at the SunShot Summit breakout session "Big and Small Ideas:

84

International Human Capital Formation, Brain Drain and Brain  

E-Print Network [OSTI]

systems, individuals' abilities, sunk educational investment costs, government grants, and expected capital formation, brain gain, brain drain, international migration, sunk costs, educational grants

Paris-Sud XI, Université de

85

Non-Hardware ("Soft") Cost-Reduction Roadmap for Residential and Small Commercial Solar Photovoltaics, 2013-2020  

SciTech Connect (OSTI)

The objective of this analysis is to roadmap the cost reductions and innovations necessary to achieve the U.S. Department of Energy (DOE) SunShot Initiative's total soft-cost targets by 2020. The roadmap focuses on advances in four soft-cost areas: (1) customer acquisition; (2) permitting, inspection, and interconnection (PII); (3) installation labor; and (4) financing. Financing cost reductions are in terms of the weighted average cost of capital (WACC) for financing PV system installations, with real-percent targets of 3.0% (residential) and 3.4% (commercial).

Ardani, K.; Seif, D.; Margolis, R.; Morris, J.; Davidson, C.; Truitt, S.; Torbert, R.

2013-08-01T23:59:59.000Z

86

Capitalize on Existing Assets with Demand Response  

E-Print Network [OSTI]

Industrial facilities universally struggle with escalating energy costs. EnerNOC will demonstrate how commercial, industrial, and institutional end-users can capitalize on their existing assetsat no cost and no risk. Demand response, the voluntary...

Collins, J.

2008-01-01T23:59:59.000Z

87

Capital Sources and Providers  

Broader source: Energy.gov [DOE]

The most important elements of a clean energy lending program are the capital source and the capital provider. The capital source provides the funding to pay for clean energy projects, and the capital provider manages those funding sources. For example, a bank might use its customers' deposits as a capital source, but as the capital provider, the bank manages the investment of that capital.

88

Estimating exergy prices for energy carriers in heating systems: Country analyses of exergy substitution with capital expenditures  

Science Journals Connector (OSTI)

Exergy represents the ability of an energy carrier to perform work and can be seen as a core indicator for measuring its quality. In this article we postulate that energy prices reflect the exergy content of the underlying energy carrier and that capital expenditures can substitute for exergy to some degree. We draw our line of argumentation from cost and technology data for heating systems of four European countries: Austria, Finland, The Netherlands, and Sweden. Firstly, this paper shows that the overall consumer costs for different heating options, widely installed in those countries, are in the same range. In this analysis we derived an overall standard deviation of about 8%. Secondly, additional analysis demonstrates that the share of capital costs on total heating cost increases with lower exergy input. Based on the data used in this analysis, we conclude that for the case of modern cost effective heating systems the substitution rate between exergy and capital is in the vicinity of 2/3. This means that by reducing the average specific exergy input of the applied energy carriers by one unit, the share of capital costs on the total costs increases by 2/3 of a unit.

A. Mller; L. Kranzl; P. Tuominen; E. Boelman; M. Molinari; A.G. Entrop

2011-01-01T23:59:59.000Z

89

Health Capital and Finance  

E-Print Network [OSTI]

Muscareela. Corporate capital expenditure decisions and thethe amount spent on capital expenditures, varying from 1% inh ist is health capital expenditures, X ist is a set of

Holland, Sara Bryant

2010-01-01T23:59:59.000Z

90

WREF 2012: THE PAST AND FUTURE COST OF WIND ENERGY  

SciTech Connect (OSTI)

The future of wind power will depend on the ability of the industry to continue to achieve cost reductions. To better understand the potential for cost reductions, this report provides a review of historical costs, evaluates near-term market trends, and summarizes the range of projected costs. It also notes potential sources of future cost reductions. Our findings indicate that steady cost reductions were interrupted between 2004 and 2010, but falling turbine prices and improved turbine performance are expected to drive a historically low LCOE for current installations. In addition, the majority of studies indicate continued cost reductions on the order of 20%-30% through 2030. Moreover, useful cost projections are likely to benefit from stronger consideration of the interactions between capital cost and performance as well as trends in the quality of the wind resource where projects are located, transmission, grid integration, and other cost variables.

NREL,; Wiser, Ryan; Lantz, Eric; Hand, Maureen

2012-03-26T23:59:59.000Z

91

EXPENDITURE OBJECT CODES Capital Outlays CAPITAL OUTLAYS are expenditures that result in acquisitions of, additions to, replacement of, or major repairs  

E-Print Network [OSTI]

EXPENDITURE OBJECT CODES ­ Capital Outlays 2-G page 1 CAPITAL OUTLAYS are expenditures that result and other purchase-related costs. #12;EXPENDITURE OBJECT CODES ­ Capital Outlays 2-G page 2 7300 and future fiscal periods. These objects are not to include cost of service contracts. 7100 Capital Outlays

Harms, Kyle E.

92

Benchmarking Non-Hardware Balance-of-System (Soft) Costs for U.S. Photovoltaic Systems Using a Bottom-Up Approach and Installer Survey  

E-Print Network [OSTI]

Photovoltaic System Prices in the United States: Current Drivers and Costsoft costs for residential and commercial photovoltaic (of-System (Soft) Costs for U.S. Photovoltaic Systems Using a

Ardani, Kristen

2014-01-01T23:59:59.000Z

93

An Analysis of the Costs, Benefits, and Implications of Different Approaches to Capturing the Value of Renewable Energy Tax Incentives  

E-Print Network [OSTI]

of emerging renewable energy technologies leads to cost8% estimated cost of capital under renewable energy MLPs is8% estimated cost of capital under renewable energy MLPs is

Bolinger, Mark

2014-01-01T23:59:59.000Z

94

SunShot Prize: America's Most Affordable Rooftop Solar: A Competition To Spur Low-Cost Rooftop Solar Installations Across The Nation (Fact Sheet)  

SciTech Connect (OSTI)

The SunShot Prize encourages novel public-private partnerships, original business models, and innovative approaches to installing clean, renewable solar energy. The sustainable business strategies developed by participants will provide transferable lessons that can be applied nationwide to hasten America's transition to affordable clean energy in a post-subsidy market.

Not Available

2012-06-01T23:59:59.000Z

95

Install Removable Insulation on Valves and Fittings  

Broader source: Energy.gov [DOE]

This tip sheet on installing removable insulation on valves and fittings provides how-to advice for improving steam systems using low-cost, proven practices and technologies.

96

Installation and Performance | Department of Energy  

Energy Savers [EERE]

Installation and Performance Photo of a group of men moving a rectangular solar panel. DOE partners with the solar industry to help reduce labor costs and maximize system...

97

Install an Automatic Blowdown-Control System  

Broader source: Energy.gov [DOE]

This steam tip sheet on installing automatic blowdown controls provide how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

98

Benchmarking Non-Hardware Balance-of-System (Soft) Costs for U.S. Photovoltaic Systems Using a Bottom-Up Approach and Installer Survey  

E-Print Network [OSTI]

Department of Energy). (2012). SunShot Vision Study. DOE/GO-prices and stimulating SunShot-level PV deployment in thetoward achieving the DOE SunShot Initiatives soft-cost-

Ardani, Kristen

2014-01-01T23:59:59.000Z

99

Foundation Capital.txt - Notepad  

Broader source: Energy.gov (indexed) [DOE]

Foundation Capital.txt Foundation Capital.txt From: Michael Bauer [MBauer@FoundationCap.com] Sent: Thursday, April 16, 2009 11:20 AM To: GC-62 Subject: Fed Register comments Dear Sir or Lady, Per Wendolyn Holland's request, here are my comments: (i) What improvements to the existing transactions (e.g. CRADAs, WFOs, User Agreements, etc.) would you suggest that DOE consider? Most obvious problem is cost of resources at national labs, which is much higher than at universities and other institutions due to imputed overhead. These costs should be reviewed to find whether they're a) really reflective of real costs at the labs, b)whether they truly reflect unique capabilities that justify the higher cost vs. comparable institutions. It's telling that many of the labs themselves tend to outsource certain research

100

CAPITAL REGION  

Broader source: Energy.gov (indexed) [DOE]

t 09/20/07 15:28 FAX 301 903 4656 t 09/20/07 15:28 FAX 301 903 4656 CAPITAL REGION 0 j002 SDOE F 1325.8 (8-89) EFG (0790) Energy United States Government Department of Energy Memorandum DATE. September 18, 2007 Audit Report No.: OAS-L-07-23 REPLY TO: IG-34 (A07TG036) SUBJECT: Evaluation of "The Federal Energy Regulatory Commission's Cyber Security Program-2007" TO: Chairman, Federal Energy Regulatory Commission The purpose of this report is to inform you of the results o Four evaluation of the Federal Energy Regulatory Commission's (Commission) cyber security program. The evaluation was initiated in May 2007, and our fieldwork was conducted through September 2007. Our methodology is described in the attachment to this report. . INTRODUCTION AND OBJECTIVE The Commission reports that it is constantly improving thl stability, reliability, and

Note: This page contains sample records for the topic "installed capital cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Capital Reporting Company  

Energy Savers [EERE]

devices and energy 22 management systems. Capital Reporting Company Quadrennial Energy Review Public Meeting 5 07-11-2014 (866) 448 - DEPO www.CapitalReportingCompany.com...

102

The impact of medicare capital prospective payment regulation on hospital capital expenditures  

Science Journals Connector (OSTI)

Our study examines the impact of the capital prospective payment system (CPPS), implemented by Medicare in 1991, on capital expenditures and cost-effective behavior of non-proprietary hospitals. As noted in the paper, we use audited financial statement data for a large national sample of hospitals. Univariate analyses demonstrate a statistically significant decline in capital expenditures in the years following the CPPS regulation without significant changes in relative aggregate operating expenses. These preliminary findings suggest that CPPS induces some cost-effective behavior by hospital managers. Ordinary least-squares (OLS) regressions indicate that capital expenditures before and after CPPS are differently affected by the changes in most explanatory variables. Further OLS regressions indicate that high-cost (low-cost) hospitals decrease (increase) capital expenditures following CPPS, once other factors are controlled for. Managerial accounting implications for hospitals include the effect of the regulation on capital budgeting decisions. Greater accounting disclosure may be necessary so that alternative modes of coping with the regulation can be discerned. Policymakers and regulators should also be aware that although reductions in capital expenditures may have favorable short-term effects of reducing health care costs, a potentially negative public health impact may result if capital expenditures continue to decrease.

Ran Barniv; Kreag Danvers; Joanne Healy

2000-01-01T23:59:59.000Z

103

SunShot Initiative: Installation and Performance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Installation and Performance to Installation and Performance to someone by E-mail Share SunShot Initiative: Installation and Performance on Facebook Tweet about SunShot Initiative: Installation and Performance on Twitter Bookmark SunShot Initiative: Installation and Performance on Google Bookmark SunShot Initiative: Installation and Performance on Delicious Rank SunShot Initiative: Installation and Performance on Digg Find More places to share SunShot Initiative: Installation and Performance on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Balance of Systems Reducing Non-Hardware Costs Lowering Barriers Fostering Growth Installation and Performance Photo of a group of men moving a rectangular solar panel. Energy Secretary Steven Chu watches members of the Solar Instructor

104

Venture Capital Finance  

Broader source: Energy.gov [DOE]

Plenary III: Project Finance and Investment Venture Capital Finance Brian Baynes, Partner, Flagship Ventures

105

Networks, Information & Social Capital  

E-Print Network [OSTI]

This paper investigates how information flows enable social networks to constitute social capital. By analyzing

Aral, Sinan

2008-01-26T23:59:59.000Z

106

Building Life Cycle Cost Programs  

Broader source: Energy.gov [DOE]

The National Institute of Standards and Technology (NIST) developed the Building Life Cycle Cost (BLCC) Program to provide computational support for the analysis of capital investments in buildings.

107

Small Business Venture Capital Tax Credit Program (Manitoba, Canada) |  

Broader source: Energy.gov (indexed) [DOE]

Venture Capital Tax Credit Program (Manitoba, Venture Capital Tax Credit Program (Manitoba, Canada) Small Business Venture Capital Tax Credit Program (Manitoba, Canada) < Back Eligibility Agricultural Commercial Construction Developer Fuel Distributor Industrial Installer/Contractor Investor-Owned Utility Municipal/Public Utility Retail Supplier Rural Electric Cooperative Systems Integrator Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Home Weatherization Water Solar Wind Program Info State Manitoba Program Type Corporate Tax Incentive Personal Tax Incentives Provider Manitoba Entrepreneurship, Training and Trade The Small Business Venture Capital Tax Credit Program (SBVCTC) assists eligible small corporations to issue new equity to primarily new investors.

108

Foreign Capital and Financial Crises  

E-Print Network [OSTI]

financing their capital expenditures. In addition, I alsoratio of cash flow to capital expenditure and the ratio ofof cash flow to capital expenditures (though the coefficient

Gullapalli, Rachita

2012-01-01T23:59:59.000Z

109

Capital expenditure decision making in small firms  

Science Journals Connector (OSTI)

A number of studies have been conducted to determine the extent to which large firms utilize sophisticated techniques in capital expenditure decision making. This research effort focuses on financial decision making procedures of small firms, exploring the techniques utilized to evaluate investment opportunities, methods employed to adjust for risk, purposes of expenditures and concern for profitability, and the source and cost of funds. In light of the recent debate on the capital shortage issue, small firms were also asked what type of tax reform they deemed most desirable to stimulate capital investments.

L.R. Runyon

1983-01-01T23:59:59.000Z

110

RM Capital Investment Plans  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Capital Investment Plans FY 2004 (568kb pdf) FY 2005 (625kb pdf) FY 2006 (625kb pdf) FY 2007 (1.45mb pdf) Meter policy Capital Investment Plans...

111

Land-Based Wind Plant Balance-of-System Cost Drivers and Sensitivities (Poster)  

SciTech Connect (OSTI)

With Balance of System (BOS) costs contributing up to 30% of the installed capital cost, it is fundamental to understand the BOS costs for wind projects as well as potential cost trends for larger turbines. NREL developed a BOS model using project cost estimates developed by industry partners. Aspects of BOS covered include engineering and permitting, foundations for various wind turbines, transportation, civil work, and electrical arrays. The data introduce new scaling relationships for each BOS component to estimate cost as a function of turbine parameters and size, project parameters and size, and geographic characteristics. Based on the new BOS model, an analysis to understand the non?turbine wind plant costs associated with turbine sizes ranging from 1-6 MW and wind plant sizes ranging from 100-1000 MW has been conducted. This analysis establishes a more robust baseline cost estimate, identifies the largest cost components of wind project BOS, and explores the sensitivity of the capital investment cost and the levelized cost of energy to permutations in each BOS cost element. This presentation shows results from the model that illustrate the potential impact of turbine size and project size on the cost of energy from US wind plants.

Mone, C.; Maples, B.; Hand, M.

2014-04-01T23:59:59.000Z

112

Vermont Seed Capital Fund (Vermont) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Seed Capital Fund (Vermont) Seed Capital Fund (Vermont) Vermont Seed Capital Fund (Vermont) < Back Eligibility Agricultural Commercial Construction Fuel Distributor Industrial Installer/Contractor Retail Supplier Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Vermont Program Type Corporate Tax Incentive Provider Vermont Department of Taxes The Vermont Seed Capital Fund increases the amount of investment capital available to new Vermont firms or to existing Vermont firms for the purpose of expansion. The first $5 million of capitalization contributed by taxpayers on or before January 1, 2014. Lesser of 4% of contribution or 50% of tax liability prior to allowance of this credit. There is a four year

113

Developer Installed Treatment Plants  

E-Print Network [OSTI]

-installed treatment plants. These treatment plants are more commonly known as package wastewater treatment plants. 1

unknown authors

2008-01-01T23:59:59.000Z

114

Capital Access Program (Vermont)  

Broader source: Energy.gov [DOE]

The Capital Access Program provides loan guarantees to small businesses seeking access to commercial credit. Premiums paid by the borrower and matched by Vermont Economic Development Authority fund...

115

U.S. Balance-of-Station Cost Drivers and Sensitivities (Presentation)  

SciTech Connect (OSTI)

With balance-of-system (BOS) costs contributing up to 70% of the installed capital cost, it is fundamental to understanding the BOS costs for offshore wind projects as well as potential cost trends for larger offshore turbines. NREL developed a BOS model using project cost estimates developed by GL Garrad Hassan. Aspects of BOS covered include engineering and permitting, ports and staging, transportation and installation, vessels, foundations, and electrical. The data introduce new scaling relationships for each BOS component to estimate cost as a function of turbine parameters and size, project parameters and size, and soil type. Based on the new BOS model, an analysis to understand the non?turbine costs has been conducted. This analysis establishes a more robust baseline cost estimate, identifies the largest cost components of offshore wind project BOS, and explores the sensitivity of the levelized cost of energy to permutations in each BOS cost element. This presentation shows results from the model that illustrates the potential impact of turbine size and project size on the cost of energy from U.S. offshore wind plants.

Maples, B.

2012-10-01T23:59:59.000Z

116

Fixed Capital Investment Tax Credit (Connecticut) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Fixed Capital Investment Tax Credit (Connecticut) Fixed Capital Investment Tax Credit (Connecticut) Fixed Capital Investment Tax Credit (Connecticut) < Back Eligibility Commercial Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Connecticut Program Type Corporate Tax Incentive Provider Connecticut Department of Economic and Community Development The Fixed Capital Investment Tax Credit allows a tax credit of 5% of the amount paid for any new fixed capital investment. Companies with fewer than 800 full-time employees may take a tax credit for machinery and equipment purchased and installed in a facility. The credit is based on a percentage of the amount spent on machinery that exceeds the amount spend on machinery

117

Pennsylvania Capital Access Program (Pennsylvania) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Pennsylvania Capital Access Program (Pennsylvania) Pennsylvania Capital Access Program (Pennsylvania) Pennsylvania Capital Access Program (Pennsylvania) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info Funding Source Pennsylvania Economic Development Financing Authority (PEDFA) State Pennsylvania Program Type

118

Capital Access Program (CAP) (Michigan) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CAP) (Michigan) CAP) (Michigan) Capital Access Program (CAP) (Michigan) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Michigan Program Type Loan Program The Capital Access Program (CAP), utilizes public resources to generate private financing for small business in Michigan seeking access to capital.

119

Capital Investment Incentive (Nova Scotia, Canada) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

You are here You are here Home » Capital Investment Incentive (Nova Scotia, Canada) Capital Investment Incentive (Nova Scotia, Canada) < Back Eligibility Commercial Developer Fuel Distributor Industrial Installer/Contractor Institutional Investor-Owned Utility Municipal/Public Utility Retail Supplier Rural Electric Cooperative Schools Systems Integrator Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Maximum Rebate $1 million (Canadian) Program Info State Nova Scotia Program Type Grant Program Rebate Program Provider Nova Scotia Department of Economic and Rural Development and Tourism The Capital Investment Incentive (CII) is part of the Productivity Investment Program as outlined in the economic growth plan for Nova Scotia,

120

Process Integration: Designing for Energy, Capital and Operability  

E-Print Network [OSTI]

Over the last five years, significant energy savings have been achieved by several international companies using the pinch concept for heat integration. New concepts are now being added to help the designer deal with capital cost minimization...

Linnhoff, B.

Note: This page contains sample records for the topic "installed capital cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

An Assessment of the Near-Term Costs of Hydrogen Refueling Stations and Station Components  

E-Print Network [OSTI]

of Reciprocating Hydrogen Compressor Costs: (Industry)of Diaphragm Hydrogen Compressor Costs (Industry) Capacity (kWh/kg includes compressor) Capital Costs Hydrogen Equipment

Lipman, T E; Weinert, Jonathan X.

2006-01-01T23:59:59.000Z

122

Economy slows Arco's capital expenditures  

Science Journals Connector (OSTI)

Economy slows Arco's capital expenditures ... Arco Chemical's new president and chief executive officer, Alan R. Hirsig, told shareholders the company plans to stretch out its capital expenditure program and as a result, expects sharply lower capital spending in 1992. ...

MARC REISCH

1991-06-10T23:59:59.000Z

123

Capital investment and momentum strategies  

Science Journals Connector (OSTI)

We use three ways to measure firms capital investment. First, we use scaled annual capital expenditure (I). Second, we use the change of scaled annual capital expenditure (IC) between 2years. Finally, ... (Accr...

Guohua Jiang; Donglin Li; Gang Li

2012-08-01T23:59:59.000Z

124

Rationale for cost-effective laboratory medicine.  

Science Journals Connector (OSTI)

...hospital, work load has increased...to contain costs in the DRG...limit future capital funds for...mechanism to control total health...Although computers can track...performed more cost effectively...investment in capital equipment...in a more cost-efficient...sufficient work load and multiple...of quality control, auto...hospital via computer, telephone...

A Robinson

1994-04-01T23:59:59.000Z

125

Income Tax Capital Credit (Alabama) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Income Tax Capital Credit (Alabama) Income Tax Capital Credit (Alabama) Income Tax Capital Credit (Alabama) < Back Eligibility Commercial Construction Industrial Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Alabama Program Type Corporate Tax Incentive The purpose of this law is to create jobs and to stimulate business and economic growth in the state by providing an income tax capital credit for approved projects. The Income Tax Capital Credit is a credit of five percent (5%) of the capital costs of a qualifying project offered by the Alabama Department of Revenue. The credits is applied to the Alabama income tax liability or financial institution excise tax generated by the project income, each year for 20 years. This credit cannot be carried forward or

126

Greener Capital | Open Energy Information  

Open Energy Info (EERE)

Name: Greener Capital Place: San Francisco, California Product: San Francisco-based clean technology VC. References: Greener Capital1 This article is a stub. You can help...

127

How Firms Make Capital Expenditure Decisions: Financial Signals, Internal Cash Flows, Income Taxes and the Tax Reform Act of 1986  

Science Journals Connector (OSTI)

This paper empirically assesses the determinants of future net capital expenditures for a broad cross-section of COMPUSTAT ... stock prices not only lower the cost of capital, but also signal good investment oppo...

Randolph Beatty; Susan Riffe; Ivo Welch

1997-10-01T23:59:59.000Z

128

Installation and Acceptance Stage  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter addresses activities required to install the software, data bases, or data that comprise the software product onto the hardware platform at sites of operation.

1997-05-21T23:59:59.000Z

129

Capital Reporting Company Quadrennial ...  

Broader source: Energy.gov (indexed) [DOE]

448 - DEPO www.CapitalReportingCompany.com 2014 100 1 I contrast it with -- with gas pipeline. 2 I know the -- the big concern about the Alaska 3 pipeline from an...

130

Solar installer's training program  

SciTech Connect (OSTI)

Instructions are given for the installation of solar domestic water heating systems, space heating systems, and pool heating systems. The basic procedures for installing any solar heating system are presented with reference to solar domestic hot water systems, and the space and pool systems are taught on that basis. (LEW)

Schmidt, W.J.; Philbin, J.

1981-01-01T23:59:59.000Z

131

Capital Projects Delivery Procedures Manual  

E-Print Network [OSTI]

1 Capital Projects Delivery Procedures Manual September 4, 2008 Office of the CFO #12;2 Page I of the Capital Budget 11 B. Budget Approval 12 C. Setting Up Capital Projects 13 III. Procedures for Design ­ Office of the Chief Financial Officer Financial Policies and Procedures for the Capital Project Delivery

Alpay, S. Pamir

132

Assigning research and development costs  

E-Print Network [OSTI]

and Development Cost Components RESEARCH AND DEVELOPMENT COSTS IN FINANCIAL STATEMENTS . 10 Capitalization Basis for Reporting Research and Development Costs Revenue Basis for Reporting Research and Development Costs Reasons Why Most Companies Expense... PRACTICE WITH ACCOUNTING THEORY Unknown Results at the End of an Accounting Period Uncertain Useful Life of Results. . . . . . . . . . . . . Recurrence of Annual Costs Permissive Feature of the Internal Revenue Code Uniform Amounts of Annual Costs...

Edwards, Wendell Edward

2012-06-07T23:59:59.000Z

133

The Ohio Capital Access Program (OCAP) (Ohio) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

The Ohio Capital Access Program (OCAP) (Ohio) The Ohio Capital Access Program (OCAP) (Ohio) The Ohio Capital Access Program (OCAP) (Ohio) < Back Eligibility Agricultural Commercial Construction Fuel Distributor Industrial Installer/Contractor Retail Supplier Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Ohio Program Type Loan Program Provider Ohio Development Services Agency The Ohio Capital Access Program (OCAP) encourages state depository financial institutions to make loans to for-profit or nonprofit small businesses that are having difficulty obtaining business loans through conventional underwriting standards. The business' principal place of business must be in Ohio with revenues less than $10 million and with fewer

134

Identifying the optimal capital structure for a second stage growth company using mezzanine financing  

Science Journals Connector (OSTI)

This paper demonstrates how mezzanine financing can be used to minimise the weighted average cost of capital for a second stage growth firm waiting to obtain equity capital from an IPO. A model is provided that allows entrepreneurs to fit their available mezzanine financing cost structure to a continuous function to determine the appropriate amount of mezzanine financing for planning purposes.

John M. Clark; Randy I. Anderson

2003-01-01T23:59:59.000Z

135

HVAC Installed Performance  

Broader source: Energy.gov (indexed) [DOE]

HVAC Installed Performance HVAC Installed Performance ESI, Tim Hanes Context * The building envelope has historically been the focus in residential homes. * The largest consumer of energy in residential homes is typically the HVAC system. * Testing the performance of the HVAC system has not been pursued to its full potential. Technical Approach * Currently very little performance testing is being done to the HVAC system. * The only way to know if a HVAC system is operating correctly is to measure the Btu/h. * This should be done at the equipment and at the the system. Recommended Guidance * Training of HVAC technicians, installers, and salespeople is a must. * If only the technician is trained than implementing the change will not happen. * Public awareness of proper installation and its

136

HVAC Installed Performance  

Broader source: Energy.gov [DOE]

This presentation was given at the Summer 2012 DOE Building America meeting on July 25, 2012, and addressed the question HVAC proper installation energy savings: over-promising or under-delivering?"

137

Structural Code Considerations for Solar Rooftop Installations.  

SciTech Connect (OSTI)

Residential rooftop solar panel installations are limited in part by the high cost of structural related code requirements for field installation. Permitting solar installations is difficult because there is a belief among residential permitting authorities that typical residential rooftops may be structurally inadequate to support the additional load associated with a photovoltaic (PV) solar installation. Typical engineering methods utilized to calculate stresses on a roof structure involve simplifying assumptions that render a complex non-linear structure to a basic determinate beam. This method of analysis neglects the composite action of the entire roof structure, yielding a conservative analysis based on a rafter or top chord of a truss. Consequently, the analysis can result in an overly conservative structural analysis. A literature review was conducted to gain a better understanding of the conservative nature of the regulations and codes governing residential construction and the associated structural system calculations.

Dwyer, Stephen F.; Dwyer, Brian P.; Sanchez, Alfred

2014-12-01T23:59:59.000Z

138

IT Capital Planning  

Broader source: Energy.gov (indexed) [DOE]

IT Capital Planning IT Capital Planning and Architecture Division (IM-21) Peter Lenentine, Director IM Organization Structure (as of 12/19/2013) Chief Information Officer (IM-1) Robert Brese Deputy Chief Information Officer Donald Adcock Associate CIO for Cyber Security (IM-30) Paul Cunningham (Acting) Corporate IT Project Management Office (IM-40) Frank Husson, Director Associate CIO for IT Planning, Architecture, and E-Government (IM-20) TheAnne Gordon Technology Evaluation Office (IM-50) Peter Tseronis, Director (Acting) Associate CIO for IT Corporate Management (IM-10) Sarah Gamage Associate CIO for Energy IT Services (IM-60) Virginia Arreguin Deputy Associate CIO for Cyber Security Paul Cunningham Deputy Associate CIO for Energy IT Services John Berthiaume (Acting) Human Capital and Administrative

139

Innovation and Social Capital in Silicon Valley  

E-Print Network [OSTI]

Innovation and Social Capital in Silicon Valley * BRIEpath from social capital to innovation has been identified.social capital has for economic development and innovation.

Kenney, Martin; Patton, Donald

2003-01-01T23:59:59.000Z

140

Cost of Wind Energy: Comparing Distant Wind Resources to Local Resources in the Midwestern United States  

Science Journals Connector (OSTI)

A general expression of the total savings from reducing the capital costs of developing a wind site with capacity factor CF+?CF, relative to the capital costs of developing the local site with capacity factor CF, is given by eq 1 (see Supporting Information section 1.1 for derivation) where Z is the annual generation requirement (kWh/year), 8670 is the number of hours in a year, WUC is the installed wind capital cost estimate ($/kW), LQCM is the cost multiplier for low quality wind requiring higher hub height (see Section 3.4), CF is the unconstrained capacity factor, ?CF is the increase in unconstrained CF at distant wind site relative to local site, TL is the transmission loss, as a percentage of total wind energy injected into the grid, TC is the transmission constraint, as a percentage of the total wind energy injected into the grid that cannot be delivered because of inadequate transmission capacity, lw is the local wind, and dw is the distant wind. ... Class 1, 2, and 3 turbines are designed for high, medium, and low speed winds, respectively (16). ... From Table 1, the impact of distance on the transmission capacity of high voltage alternating current (HVAC) lines is clear (see Supporting Information section 8). ...

David C. Hoppock; Dalia Patio-Echeverri

2010-10-08T23:59:59.000Z

Note: This page contains sample records for the topic "installed capital cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Retail Infrastructure Costs Comparison for Hydrogen and Electricity for Light-Duty Vehicles: Preprint  

SciTech Connect (OSTI)

Both hydrogen and plug-in electric vehicles offer significant social benefits to enhance energy security and reduce criteria and greenhouse gas emissions from the transportation sector. However, the rollout of electric vehicle supply equipment (EVSE) and hydrogen retail stations (HRS) requires substantial investments with high risks due to many uncertainties. We compare retail infrastructure costs on a common basis - cost per mile, assuming fueling service to 10% of all light-duty vehicles in a typical 1.5 million person city in 2025. Our analysis considers three HRS sizes, four distinct types of EVSE and two distinct EVSE scenarios. EVSE station costs, including equipment and installation, are assumed to be 15% less than today's costs. We find that levelized retail capital costs per mile are essentially indistinguishable given the uncertainty and variability around input assumptions. Total fuel costs per mile for battery electric vehicle (BEV) and plug-in hybrid vehicle (PHEV) are, respectively, 21% lower and 13% lower than that for hydrogen fuel cell electric vehicle (FCEV) under the home-dominant scenario. Including fuel economies and vehicle costs makes FCEVs and BEVs comparable in terms of costs per mile, and PHEVs are about 10% less than FCEVs and BEVs. To account for geographic variability in energy prices and hydrogen delivery costs, we use the Scenario Evaluation, Regionalization and Analysis (SERA) model and confirm the aforementioned estimate of cost per mile, nationally averaged, but see a 15% variability in regional costs of FCEVs and a 5% variability in regional costs for BEVs.

Melaina, M.; Sun, Y.; Bush, B.

2014-08-01T23:59:59.000Z

142

Hazel Capital | Open Energy Information  

Open Energy Info (EERE)

Hazel Capital Hazel Capital Jump to: navigation, search Name Hazel Capital Place London, England, United Kingdom Zip WC2A 1AL Sector Efficiency, Renewable Energy Product Hazel Capital is an asset management company investing in Renewable Energy, Energy Efficiency (in energy transmission, building construction, electronic and engineered products), Water, Transportation, Waste Management, Recycling & Pollution Control. References Hazel Capital[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Hazel Capital is a company located in London, England, United Kingdom . References ↑ "Hazel Capital" Retrieved from "http://en.openei.org/w/index.php?title=Hazel_Capital&oldid=346400

143

Capital indivisibility and economic efficiency  

Science Journals Connector (OSTI)

......i-r)T ) . (50) CAPITAL INDIVISIBILITY AND ECONOMIC...justifiable when paying off past expenditure, but, when applied to future expenditure, it leads to effectively...uncertainty about future capital investment, this weighting......

W. R. Hodgkins

2014-01-01T23:59:59.000Z

144

On Capital Investment Yossi Azar1, Yair Bartal2, Esteban Feuerstein3, Amos Fiat1, Stefano Leonardi4 and  

E-Print Network [OSTI]

On Capital Investment Yossi Azar1, Yair Bartal2, Esteban Feuerstein3, Amos Fiat1, Stefano Leonardi4 of making capital investments in ma- chines for manufacturing a product. Opportunities for investment occur the total production and capital costs when future demand for the product being produced and investment

Azar, Yossi

145

On Capital Investment Yossi Azar 1 , Yair Bartal 2 , Esteban Feuerstein 3 , Amos Fiat 1 , Stefano Leonardi 4 and  

E-Print Network [OSTI]

On Capital Investment Yossi Azar 1 , Yair Bartal 2 , Esteban Feuerstein 3 , Amos Fiat 1 , Stefano with the problem of making capital investments in ma­ chines for manufacturing a product. Opportunities for investment occur over time, every such option consists of a capital cost for a new machine and a re­ sulting

Fiat, Amos

146

Capital Investment Tax Credit (Florida) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Tax Credit (Florida) Tax Credit (Florida) Capital Investment Tax Credit (Florida) < Back Eligibility Commercial Construction Fuel Distributor Installer/Contractor Investor-Owned Utility Systems Integrator Transportation Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Florida Program Type Corporate Tax Incentive Provider Enterprise Florida The Capital Investment Tax Credit is an annual credit, provided for up to twenty years, against the corporate income tax. Eligible projects are those in designated high-impact portions of the following sectors: clean energy, biomedical technology, financial services, information technology, silicon technology, transportation equipment manufacturing, or be a corporate

147

Survey Results and Analysis of the Cost and Efficiency of Various Operating Hydrogen Fueling Stations  

SciTech Connect (OSTI)

Existing Hydrogen Fueling Stations were surveyed to determine capital and operational costs. Recommendations for cost reduction in future stations and for research were developed.

Cornish, John

2011-03-05T23:59:59.000Z

148

Development of surface mine cost estimating equations  

SciTech Connect (OSTI)

Cost estimating equations were developed to determine capital and operating costs for five surface coal mine models in Central Appalachia, Northern Appalachia, Mid-West, Far-West, and Campbell County, Wyoming. Engineering equations were used to estimate equipment costs for the stripping function and for the coal loading and hauling function for the base case mine and for several mines with different annual production levels and/or different overburden removal requirements. Deferred costs were then determined through application of the base case depreciation schedules, and direct labor costs were easily established once the equipment quantities (and, hence, manpower requirements) were determined. The data points were then fit with appropriate functional forms, and these were then multiplied by appropriate adjustment factors so that the resulting equations yielded the model mine costs for initial and deferred capital and annual operating cost. (The validity of this scaling process is based on the assumption that total initial and deferred capital costs are proportional to the initial and deferred costs for the primary equipment types that were considered and that annual operating cost is proportional to the direct labor costs that were determined based on primary equipment quantities.) Initial capital costs ranged from $3,910,470 in Central Appalachia to $49,296,785; deferred capital costs ranged from $3,220,000 in Central Appalachia to $30,735,000 in Campbell County, Wyoming; and annual operating costs ranged from $2,924,148 in Central Appalachia to $32,708,591 in Campbell County, Wyoming. (DMC)

Not Available

1980-09-26T23:59:59.000Z

149

IT Capital Planning  

Broader source: Energy.gov (indexed) [DOE]

IT Capital Planning IT Capital Planning and Architecture Division (IM-21) Carol Blackston, Director (Acting) IM Organization Structure (as of 1/13/2014) Chief Information Officer (IM-1) Robert Brese Deputy Chief Information Officer Donald Adcock Associate CIO for Cyber Security (IM-30) Paul Cunningham (Acting) Corporate IT Project Management Office (IM-40) Frank Husson, Director Associate CIO for IT Planning, Architecture, and E-Government (IM-20) Russell Pereira (Acting) Associate CIO for Technology Evaluation and Chief Technology Officer (IM-50) Peter Tseronis Associate CIO for IT Corporate Management (IM-10) Sarah Gamage Associate CIO for Energy IT Services (IM-60) Virginia Arreguin Deputy Associate CIO for Cyber Security Paul Cunningham Deputy Associate CIO for Energy IT Services Steve Cox (Acting)

150

Hydrogen Refueling Station Costs in Shanghai  

E-Print Network [OSTI]

to hydrogen storage vessels and compressors. Feedstock CostHydrogen Production Equipment Purifier Storage System Compressor Dispenser Additional Equipment Installation Costshydrogen equipment costs. Meyers [2] provides an in depth analyses of reformer, compressor, and storage equipment costs.

Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

2006-01-01T23:59:59.000Z

151

The Levelized Cost of Energy (LCOE) of wave energy using GIS based analysis: The case study of Portugal  

Science Journals Connector (OSTI)

Abstract The main objective of this paper is to establish an economic modelling of wave energy through a Geographical Information System (GIS). Furthermore, this method has been tested for the particular case of the Portuguese coast. It determines the best sea areas to install wave energy converters in this region, using spatial analysis of the Levelized Cost of Energy (LCOE). Several economic parameters, as capital or O&M costs, have been considered. In addition, a sensitivity analysis has been performed by varying the discount rate in three different scenarios. Several types of physical restrictions have been taken into account: bathymetry, submarine electrical cables, seabed geology, environmental conditions, protected areas in terms of heritage, navigation areas, seismic fault lines, etc. Spatial operations have been carried out to complete the procedure, using Model Builder of GIS software. Results indicate the most suitable areas in economic terms in Portugal to install wave energy devices.

Laura Castro-Santos; Geuffer Prado Garcia; Ana Estanqueiro; Paulo A.P.S. Justino

2015-01-01T23:59:59.000Z

152

Secretary Chu Announces Two Million Smart Grid Meters Installed Nationwide  

Broader source: Energy.gov (indexed) [DOE]

Two Million Smart Grid Meters Installed Two Million Smart Grid Meters Installed Nationwide Secretary Chu Announces Two Million Smart Grid Meters Installed Nationwide August 31, 2010 - 12:00am Addthis Columbus, OH - At an event today at Battelle headquarters in Columbus, Ohio, U.S. Energy Secretary Steven Chu announced that two million smart grid meters have been installed across the country, helping to reduce energy costs for families and businesses. As a result of funding from the Recovery Act, smart grid technology is speeding the modernization of the nation's electrical grid, helping to reduce the amount of time needed to respond to energy disruptions and enable consumers to monitor their energy consumption and costs. So far, more than 180,000 smart meters have been installed in Ohio. "As a result of an unprecedented investment from the Recovery Act, smart

153

Report: EM Human Capital Initiatives  

Broader source: Energy.gov (indexed) [DOE]

HUMAN CAPITAL HUMAN CAPITAL September 25, 2008 Submitted by the EMAB Human Capital Subcommittee Background: The enhancement of the Office of Environmental Management's (EM) human capital has been a central tenet of the Assistant Secretary's tenure, reflecting the critical nature of this resource to the achievement of EM's mission. Beginning in Fiscal Year (FY) 2006, the Environmental Management Advisory Board (EMAB or Board) has reviewed the program's human capital issues and the plans EM has developed to address them. This review produced a number of recommendations that were presented in the Board's FY 2006 report to the Assistant Secretary and were later approved and implemented to varying degrees. * Recommendation 2006-01: Develop accountability for the Human Capital Plan

154

Principal Associate Director - Capital Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Principal Associate Director - Capital Projects Principal Associate Director - Capital Projects As Principal Associate Director for Capital Projects, Henry is responsible for institutional large-project construction and management and environmental cleanup functions. Contact Operator Los Alamos National Laboratory (505) 667-5061 Before coming to the Lab in 2011, he served as manager of the $3.2 billion project to safely destroy the stockpile of deadly mustard chemical agent at the Pueblo Chemical Depot in Colorado. Paul Henry Principal Associate Director for Capital Projects Paul Henry, Principal Associate Director for Capital Projects As Principal Associate Director for Capital Projects, Henry is responsible for institutional large-project construction and management and environmental cleanup functions.

155

Capital budgeting practices in hospitals  

Science Journals Connector (OSTI)

We interviewed chief financial officers from hospitals and healthcare systems in Michigan regarding selected capital budgeting practices that have not been previously considered in the literature. Results revealed a variety of approaches in the development and deployment of capital budgets. Most healthcare systems used a blend of board and department-initiated input into budget development, usually with interaction between the two. The majority of healthcare systems had flexibility in the deployment of their capital budgets over time. Standard methods of project evaluation were employed by healthcare CFOs, but few used the most sophisticated tools. A host of constraints, including certificate-of-need laws and internal, mission-based motivations uniquely affect capital budgeting of not-for-profit healthcare systems. Clearly, future research will be need to understand why organisations have selected capital budgeting practices and the extent to which selection and use of capital budgeting practices matters in the efficiency and viability of healthcare systems.

Dean G. Smith; Joshua Wynne

2006-01-01T23:59:59.000Z

156

Energy Department Completes Cool Roof Installation on DC Headquarters  

Broader source: Energy.gov (indexed) [DOE]

Completes Cool Roof Installation on DC Completes Cool Roof Installation on DC Headquarters Building to Save Money by Saving Energy Energy Department Completes Cool Roof Installation on DC Headquarters Building to Save Money by Saving Energy December 14, 2010 - 12:00am Addthis Washington - Secretary Steven Chu today announced the completion of a new cool roof installation on the Department of Energy's Headquarters West Building. There was no incremental cost to adding the cool roof as part of the roof replacement project and it will save taxpayers $2,000 every year in building energy costs. Cool roofs use lighter-colored roofing surfaces or special coatings to reflect more of the sun's heat, helping improve building efficiency, reduce cooling costs and offset carbon emissions. The cool roof and increased insulation at the facility were

157

Venture Capital Finance  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

oil prices create a disruptive opportunity for lower cost feedstocks * North American shale gas is a game changer (vs rest of world) * Untapped potential in biomass, especially...

158

Installation Guide 1. PREFACE .................................................................................................................................................... 3  

E-Print Network [OSTI]

AoC Installation Guide #12;Contents 1. PREFACE....................................................................................................................................................... 4 3.2 AOC............................................................................................................................................................. 4 3.3 AOC ADMIN

Natvig, Lasse

159

Sustainable Investments Capital SI Capital | Open Energy Information  

Open Energy Info (EERE)

SI Capital SI Capital Jump to: navigation, search Name Sustainable Investments Capital (SI Capital) Place Barcelona, Spain Zip 8021 Sector Renewable Energy, Services Product SI Capital is an independent financial institution set up to develop investment products and services for renewable energy and other sustainable projects. Coordinates 41.385589°, 2.168745° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.385589,"lon":2.168745,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

160

PURDUE EXTENSION Capital Investment Analysis  

E-Print Network [OSTI]

PURDUE EXTENSION EC-731 Capital Investment Analysis and Project Assessment Michael Boehlje and Cole Ehmke Department of Agricultural Economics Audience: Business managers facing a capital investment present value of a project and determine if the investment will generate enough cash to make debt payments

Note: This page contains sample records for the topic "installed capital cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

FOREIGN INVESTMENT: Private Capital Welcome  

Science Journals Connector (OSTI)

FOREIGN INVESTMENT: Private Capital Welcome ... The recent proposal by a business advisory council for a federally chartered corporation to spur private capital investment in developing countries " . . . ... The proposed corporation, urged in a report to the Agency for International Development, would take over and expand the investment guaranty and financing programs administered by AID's Office of Private Resources. ...

1969-01-06T23:59:59.000Z

162

Human Capital Management Accountability Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order establishes requirements, roles and responsibilities for the Human Capital Management Accountability Program (HCMAP) for human resources programs and personnel and ensures that human capital activities are regulatory and procedurally compliant with Federal statutes and Departmental policies. Does not cancel other directives.

2008-08-01T23:59:59.000Z

163

CAPITAL INVESTMENT: CPI Spending Slacks Off  

Science Journals Connector (OSTI)

CAPITAL INVESTMENT: CPI Spending Slacks Off ... The latest quarterly capital investment survey by the National Industrial Conference Board puts unspent chemical industry capital appropriations at their lowest level since the end of 1964. ...

1968-09-09T23:59:59.000Z

164

CAPITAL PROGRAMMING GUIDE (PART 7)  

Broader source: Energy.gov (indexed) [DOE]

CAPITAL PROGRAMMING GUIDE CAPITAL PROGRAMMING GUIDE V 2.0 SUPPLEMENT TO OFFICE OF MANAGEMENT AND BUDGET CIRCULAR A-11, PART 7: PLANNING, BUDGETING, AND ACQUISITION OF CAPITAL ASSETS JUNE 2006 CAPITAL PROGRAMMING GUIDE LIST OF ABBREVIATIONS LIST OF ABBREVIATIONS ACP Agency Capital Plan CI Commercial Items COTS Commercial-off-the-shelf ESPC Energy Savings Performance Contract EVM Earned Value Management FAR Federal Acquisition Regulation FARA Federal Acquisition Reform Act (Clinger-Cohen Act) of 1996 1 (Division D of Pub. L. No. 104-106) FASA Federal Acquisition Streamlining Act of 1994 (Pub. L. No. 103-355) FRPC Federal Real Property Council GAO Government Accountability Office GPRA Government Performance and Results Act of 1993 (Pub. L. No. 103-62)

165

Yellowstone Capital | Open Energy Information  

Open Energy Info (EERE)

Yellowstone Capital Yellowstone Capital Jump to: navigation, search Logo: Yellowstone Capital Name Yellowstone Capital Address 5555 San Felipe, Suite 1650 Place Houston, Texas Zip 77056 Region Texas Area Product Private equity and venture capital investment firm Phone number (713) 650-0065 Website http://www.yellowstonecapital. Coordinates 29.749479°, -95.471973° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":29.749479,"lon":-95.471973,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

166

BEV Capital | Open Energy Information  

Open Energy Info (EERE)

BEV Capital BEV Capital Jump to: navigation, search Logo: BEV Capital Name BEV Capital Address 263 Tresser Blvd., 9th Floor Place Stamford, Connecticut Zip 06901 Region Northeast - NY NJ CT PA Area Product Venture capital firm. Phone number (203) 724-1100 Website http://www.bevcapital.com/ Coordinates 41.0518165°, -73.535274° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.0518165,"lon":-73.535274,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

167

Commons Capital | Open Energy Information  

Open Energy Info (EERE)

Commons Capital Commons Capital Jump to: navigation, search Logo: Commons Capital Name Commons Capital Address 320 Washington Street, 4th floor Place Brookline, Massachusetts Zip 02445 Region Greater Boston Area Product Early-stage venture capital fund. Phone number (617) 739-3500 Website http://www.commonscapital.com/ Coordinates 42.3333887°, -71.1201943° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.3333887,"lon":-71.1201943,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

168

Rationale for cost-effective laboratory medicine.  

Science Journals Connector (OSTI)

...expendi- tures had become an important political issue (6). The conclu- sion had been...based on probability theory, iatrogenic risks, clini- cal decision making, cost...unknown. This can alleviate the premature investment in capital equipment or new personnel...

A Robinson

1994-04-01T23:59:59.000Z

169

Hydrogen Production Cost Estimate Using Biomass Gasification: Independent Review  

Broader source: Energy.gov [DOE]

This independent review report assesses the 2009 state-of-the-art and 2020 projected capital cost, energy efficiency, and levelized cost for hydrogen production from biomass via gasification.

170

Throughput-cost analysis of optical flow switching  

E-Print Network [OSTI]

In this paper, we employ a cost model embodying major sources of capital expenditure (CapEx) to compare the throughput-cost tradeoff offered by optical flow switching to that of more traditional optical network architectures.

Chan, Vincent W. S.

171

Throughput-Cost Analysis of Optical Flow Switching  

Science Journals Connector (OSTI)

In this paper, we employ a cost model embodying major sources of capital expenditure (CapEx) to compare the throughput-cost tradeoff offered by Optical Flow Switching to that of more...

Weichenberg, Guy; Chan, Vincent W; Swanson, Eric A; Mdard, Muriel

172

Blue Green Capital | Open Energy Information  

Open Energy Info (EERE)

Green Capital Jump to: navigation, search Name: Blue Green Capital Place: Spain Zip: 8860 Sector: Renewable Energy, Solar Product: String representation "Spanish develop ... their...

173

Digital Power Capital LLC | Open Energy Information  

Open Energy Info (EERE)

Power Capital LLC Jump to: navigation, search Name: Digital Power Capital LLC Place: Greenwich, Connecticut Zip: 6830 Product: A private equity firm focused on new technologies...

174

Costs and benefits of pneumatic collection in three specific New York City cases  

Science Journals Connector (OSTI)

Abstract Truck-based collection of municipal solid waste imposes significant negative externalities on cities and constrains the efficiency of separate collection of recyclables and organics and of unit-price-based waste-reduction systems. In recent decades, hundreds of municipal-scale pneumatic collection systems have been installed in Europe and Asia. Relatively few prior studies have compared the economic or environmental impacts of these systems to those of truck collection. A critical factor to consider when making this comparison is the extent to which the findings reflect the specific geographic, demographic, and operational characteristics of the systems considered. This paper is based on three case studies that consider the specific characteristics of three locations, comparing pneumatic systems with conventional collection on the basis of actual waste tonnages, composition, sources, collection routes, truck trips, and facility locations. In one case, alternative upgrades to an existing pneumatic system are compared to a potential truck-collection operation. In the other cases, existing truck operations are compared to proposed pneumatic systems which, to reduce capital costs, would be installed without new trenching or tunneling through the use of existing linear infrastructure. For the two proposed retrofit pneumatic systems, up to 48,000 truck kilometers travelled would be avoided and energy use would be reduced by up to 60% at an incremental cost of up to $400,000 USD per year over the total operating-plus-capital cost of conventional collection. In the location where a greenfield pneumatic system is already in operation, truck collection would be both less expensive and more energy-efficient than pneumatic collection. The results demonstrate that local geographic, demographic, and operational conditions play a decisive role in determining whether pneumatic collection will reduce energy requirements, produce more or fewer greenhouse gas emissions, and cost more or less over the long-term. These findings point to the local factors that will determine the relative economic and environmental costs and benefits in specific situations.

Benjamin Miller; Juliette Spertus; Camille Kamga

2014-01-01T23:59:59.000Z

175

NREL: Energy Analysis - Energy Technology Cost and Performance Data for  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Bookmark and Share Bookmark and Share Energy Technology Cost and Performance Data for Distributed Generation Transparent Cost Database Button Recent cost estimates for distributed generation (DG) renewable energy technologies are available across capital costs, operations and maintenance (O&M) costs, and levelized cost of energy (LCOE). Use the tabs below to navigate the charts. The LCOE tab provides a simple calculator for both utility-scale and DG technologies that compares the combination of capital costs, O&M, performance, and fuel costs. If you are seeking utility-scale technology cost and performance estimates, please visit the Transparent Cost Database website for NREL's information regarding vehicles, biofuels, and electricity generation. Capital Cost (September 2013 Update)

176

Hawaii Marine Base Installs Solar Roofs | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Hawaii Marine Base Installs Solar Roofs Hawaii Marine Base Installs Solar Roofs Hawaii Marine Base Installs Solar Roofs April 2, 2010 - 2:42pm Addthis Lorelei Laird Writer, Energy Empowers What does this project do? Marine Corps Base Hawaii replaced roofs on two buildings with polyvinyl chloride membrane 'cool' roofs and solar panels. The new roofs saves $20,000 a year in energy costs. Built on the end of the Mokapu Peninsula on Oahu's northeast coast, the Marine Corps Base Hawaii (MCBH) at Kaneohe Bay gets plenty of sunlight. But harnessing that sunlight to create renewable electricity was considered too expensive to be practical - until 2008. That's when MCBH took advantage of planned maintenance funding to help offset the high cost of installing photovoltaic panels on the base. As a military entity, MCBH can't directly take advantage of federal or state

177

Hawaii Marine Base Installs Solar Roofs | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Marine Base Installs Solar Roofs Marine Base Installs Solar Roofs Hawaii Marine Base Installs Solar Roofs April 2, 2010 - 2:42pm Addthis Lorelei Laird Writer, Energy Empowers What does this project do? Marine Corps Base Hawaii replaced roofs on two buildings with polyvinyl chloride membrane 'cool' roofs and solar panels. The new roofs saves $20,000 a year in energy costs. Built on the end of the Mokapu Peninsula on Oahu's northeast coast, the Marine Corps Base Hawaii (MCBH) at Kaneohe Bay gets plenty of sunlight. But harnessing that sunlight to create renewable electricity was considered too expensive to be practical - until 2008. That's when MCBH took advantage of planned maintenance funding to help offset the high cost of installing photovoltaic panels on the base. As a military entity, MCBH can't directly take advantage of federal or state

178

HTAR Client Configuration and Installation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Configuration and Installation Configuration and Installation HTAR Configuration and Installation HTAR is an archival utility similar to gnu-tar that allows for the archiving and extraction of local files into and out of HPSS. Configuration Instructions This distribution has default configuration settings which will work for most environments. If you want to use the default values (recommended) you can skip to the section labeled INSTALLATION INSTRUCTIONS. In certain environments, for example if your installation is on a machine which has more than one network interface, you may want to change some of these default settings. To help with this, an interactive Configure script is provided. To use it do $ ./Configure prior to installing. Configure will provide a description of the options

179

Would You Consider Installing a Cool Roof? | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Would You Consider Installing a Cool Roof? Would You Consider Installing a Cool Roof? Would You Consider Installing a Cool Roof? August 12, 2010 - 7:30am Addthis On Monday, Erin discussed cool roof technologies and how they can improve the comfort of buildings while reducing energy costs. Would you consider installing a cool roof? Why or why not? Each Thursday, you have the chance to share your thoughts on a question about energy efficiency or renewable energy for consumers. Please comment with your answers, and also feel free to respond to other comments. E-mail your responses to the Energy Saver team at consumer.webmaster@nrel.gov. Addthis Related Articles Would You Consider Driving a Vehicle that Can Run on Biodiesel? Would You Consider Installing a Cool Roof? Tips: Energy-Efficient Roofs How Do You Save Water When Caring for Your Lawn?

180

Assessing the costs of solar power plants for the Island of Roatn .  

E-Print Network [OSTI]

??This is an analysis assessing the installation costs of different solar power plant technologies and the current commercial availability for installation on the Island or (more)

Huwe, Ethan (Ethan L.)

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "installed capital cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Nite Capital | Open Energy Information  

Open Energy Info (EERE)

Nite Capital Nite Capital Jump to: navigation, search Name Nite Capital Place Libertyville, Illinois Zip 60048 Product Nite Capital provides private financing for small-cap and micro-cap public companies. Coordinates 40.95912°, -92.049669° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.95912,"lon":-92.049669,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

182

Infield Capital | Open Energy Information  

Open Energy Info (EERE)

Infield Capital Infield Capital Jump to: navigation, search Name Infield Capital Place Boulder, Colorado Product Infield Capital was founded in 2008, and is focused on investment in early-stage clean technologies for the transportation industry, with an emphasis on future powertrain technologies. Coordinates 42.74962°, -109.714163° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.74962,"lon":-109.714163,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

183

Greenview Capital | Open Energy Information  

Open Energy Info (EERE)

Greenview Capital Greenview Capital Jump to: navigation, search Name Greenview Capital Place Libertyville, Illinois Zip 60048 Product Greenview Capital is a U.S. based consulting firm and merchant bank specialising in taking private companies public through a reverse merger or alternative public offering. Coordinates 40.95912°, -92.049669° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.95912,"lon":-92.049669,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

184

CMEA Capital | Open Energy Information  

Open Energy Info (EERE)

CMEA Capital CMEA Capital Jump to: navigation, search Logo: CMEA Capital Name CMEA Capital Address 1 Embarcadero Center Place San Francisco, California Zip 94111 Region Bay Area Number of employees 11-50 Year founded 1989 Phone number 415-352-1250 Website http://www.cmea.com/ Coordinates 37.794497°, -122.39962° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.794497,"lon":-122.39962,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

185

Osmosis Capital | Open Energy Information  

Open Energy Info (EERE)

Osmosis Capital Osmosis Capital Jump to: navigation, search Name Osmosis Capital Place London, United Kingdom Zip EC4M 9DN Sector Carbon Product An investment firm seeking low carbon economy opportunity investments through its Osmosis Capital Fund. Coordinates 51.506325°, -0.127144° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.506325,"lon":-0.127144,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

186

Venture Capital Program (North Dakota)  

Broader source: Energy.gov [DOE]

The Venture Capital Program, provided by the ND Department of Commerce, is an innovative financial program that provides flexible financing through debt and equity investments for new or expanding...

187

Operating and Capital Expenditures Models  

Science Journals Connector (OSTI)

In this chapter, you will learn how to plan, create, and use the Operating Expenditure (OPEX) model and the Capital Expenditure (CAPEX) model. These models are used ... to forecast, respectively, general operatin...

2009-01-01T23:59:59.000Z

188

More on Capital Expenditure Anticipations  

Science Journals Connector (OSTI)

We turn now to analysis of investment realizations functions, beginning with the one-year ahead, or short run capital expenditure anticipations,based upon McGraw-Hill data over...a fortiori..., for all firms of a...

R. Eisner

1978-01-01T23:59:59.000Z

189

Florida Capital Access Program (Florida)  

Broader source: Energy.gov [DOE]

The Florida Capital Access Program, run by the Florida Department of Economic Development, is a loan portfolio insurance program enabling lenders to make loans to credit-worthy small businesses. ...

190

Carbon Capital | Open Energy Information  

Open Energy Info (EERE)

Sector: Carbon Product: Manages a carbon fund specialised in forestry projects References: Carbon Capital1 This article is a stub. You can help OpenEI by expanding it. Carbon...

191

Atrium Capital | Open Energy Information  

Open Energy Info (EERE)

Atrium Capital Atrium Capital Jump to: navigation, search Logo: Atrium Capital Name Atrium Capital Address 3000 Sand Hill Road, Building 2, Suite 240 Place Menlo Park, California Zip 94025 Region Bay Area Product Corporate strategic venture investing Year founded 1991 Phone number (650) 233-7878 Website http://www.atriumcapital.com/ Coordinates 37.4244767°, -122.1942422° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.4244767,"lon":-122.1942422,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

192

Social Capital and Growth Bryan R. Routledge ,  

E-Print Network [OSTI]

, labor mobility, and social capital. The key assumption is that technological innovation, which drivesSocial Capital and Growth Bryan R. Routledge , Joachim von Amsberg § March 2002 Revised July 2002 Abstract We define and characterize social capital in a simple growth model. We capture social capital

193

Honeywell acquires First Technology share capital  

Science Journals Connector (OSTI)

Honeywell has declared its offer to acquire the entire issued share capital of First Technology plc.

2006-01-01T23:59:59.000Z

194

Capital Expenditure on Education in Britain  

Science Journals Connector (OSTI)

... Economic Secretary to the Treasury, Mr. A. Barber, said that during 1956-57: capital ...capitalexpenditure ...

1962-05-19T23:59:59.000Z

195

Low-Cost, Lightweight Solar Concentrator  

Broader source: Energy.gov (indexed) [DOE]

sunshot DOEGO-102012-3663 * September 2012 MOTIVATION Solar concentrators currently cost 150-250m 2 , which represents as much as half of the total installed cost for a...

196

Cost of Fuel to General Electricity  

Broader source: Energy.gov (indexed) [DOE]

of Fuel to Generate Electricity of Fuel to Generate Electricity Cost of Fuel to Generate Electricity Herb Emmrich Gas Demand Forecast, Economic Analysis & Tariffs Manager SCG/SDG&E SCG/SDG&E Federal Utility Partnership Working Group (FUPWG) 2009 Fall Meeting November 18, 2009 Ontario, California The Six Main Costs to Price Electricity are:  Capital costs - the cost of capital investment (debt & equity), depreciation, Federal & State income taxes and property taxes and property taxes  Fuel costs based on fuel used to generate electricity - hydro, natural gas, coal, fuel oil, wind, solar, photovoltaic geothermal biogas photovoltaic, geothermal, biogas  Operating and maintenance costs  Transmission costs  Distribution costs  Social adder costs - GHG adder, low income adder,

197

Systems study of drilling for installation of geothermal heat pumps  

SciTech Connect (OSTI)

Geothermal, or ground-source, heat pumps (GHP) are much more efficient than air-source units such as conventional air conditioners. A major obstacle to their use is the relatively high initial cost of installing the heat-exchange loops into the ground. In an effort to identify drivers which influence installation cost, a number of site visits were made during 1996 to assess the state-of-the-art in drilling for GHP loop installation. As an aid to quantifying the effect of various drilling-process improvements, we constructed a spread-sheet based on estimated time and material costs for all the activities required in a typical loop-field installation. By substituting different (improved) values into specific activity costs, the effect on total project costs can be easily seen. This report contains brief descriptions of the site visits, key points learned during the visits, copies of the spread-sheet, recommendations for further work, and sample results from sensitivity analysis using the spread-sheet.

Finger, J.T.; Sullivan, W.N.; Jacobson, R.D.; Pierce, K.G.

1997-09-01T23:59:59.000Z

198

Standard costs for labor  

E-Print Network [OSTI]

STANDARD COSTS FOR LABOR A Thesis By MD. NURUL ABSAR KHAN Submitted to the Graduate School of the Agricultural and Mechanical College of Texms in partial fulfillment of the requirements for the degree of MASTER OF BUSINESS ADMINISTRATION... Administration and the government of East Pakistan. CONTENTS Chapter Page I. Introduction and Prelisd. nary Discussion II. Installation and Accounting Aspects of Standard Costs for Labor III, Recording~ Analysing and Reporting of Labor Vaxlances . 45 IV...

Khan, Mohammed Nurul Absar

2012-06-07T23:59:59.000Z

199

A techno-economic analysis of cost savings for retrofitting industrial aerial coolers with variable frequency drives  

Science Journals Connector (OSTI)

A techno-economic model was created in order to develop curves that show the typical annual energy savings, rate of return, and payback for retrofitting aerial coolers with variable frequency drives (VFDs) for up to 50motors, motor sizes from 4 to 186kW (5250hp), and varying climate conditions. The cost savings due to installing a VFD depends on the reduction in energy used, as well as the reduction in power demand, the capital cost of the VFD, installation cost of the VFD, change in operating cost, and cost of electricity. The geographic locations examined in this report were Fort McMurray, Calgary, Vancouver, and Thunder Bay. This study found that the IRR increases rapidly with motor size, becomes greater than 10% at a motor size of approximately 15kW, and may be as high as 220% (for the case of fifty, 186kW motors). The IRR is sensitive to the number of fan motors retrofitted with VFDs, however the sensitivity rapidly declines as the number of motors is increased beyond five. The simple payback period becomes less than 1year and nearly independent of number of motors and motor size for motors larger than 90kW. Ambient temperature and geographic location affect the profitability of the investment, although the IRR only changes by approximately 4%.

Patrick Miller; Babatunde Olateju; Amit Kumar

2012-01-01T23:59:59.000Z

200

Earthrise Capital | Open Energy Information  

Open Energy Info (EERE)

Earthrise Capital Earthrise Capital Jump to: navigation, search Logo: Earthrise Capital Name Earthrise Capital Address 45 Rockefeller Plaza, 20th Floor Place New York, New York Zip 10111 Region Northeast - NY NJ CT PA Area Product Venture capital fund primarily focused on energy, power and water production and use Phone number (212) 757-1007 Website http://www.earthrisecapital.co Coordinates 40.758928°, -73.977127° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.758928,"lon":-73.977127,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "installed capital cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Capital budgeting methods, management control systems and the R&D intensity of the firm  

Science Journals Connector (OSTI)

This paper investigates the effect of the Research and Development (R&D) intensity of the firm on the use of management control systems, capital budgeting methods and the methods to determine the cost of capital. Based on earlier literature, we develop several hypotheses that we test empirically, using survey data of the 101 Finnish firms operating in the capital area. The results indicate that the use of management control systems such as control and bonus systems, budgeting and strategic alliances increases with the degree of the R&D intensity of the firm. The results also indicate that high-R&D-intensity firms use formal capital budgeting methods within large and strategic projects. Finally, our results show that the use of sophisticated capital budgeting methods such as Net Present Value (NPV) and Internal Rate of Return (IRR) methods increases with the R&D intensity of the firm. Our results remain materially the same after controlling for several firm characteristics.

Hanna Silvola

2008-01-01T23:59:59.000Z

202

Magnet Girder Assembly and Installation  

ScienceCinema (OSTI)

It takes teamwork to assemble and install magnet girders for the storage ring of the National Synchrotron Light Source II. NSLS-II is now under construction at Brookhaven Lab.

None

2013-07-17T23:59:59.000Z

203

Solar Installation Labor Market Analysis  

SciTech Connect (OSTI)

The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

Friedman, B.; Jordan, P.; Carrese, J.

2011-12-01T23:59:59.000Z

204

Foldtrack Installation in C-110  

Broader source: Energy.gov [DOE]

Crews successfully installed a new and improved version of the Foldtrack into tank C-110, a single-shell tank with about 17,200 gallons of waste remaining.

205

Characterization of the Installed Costs of Prime Movers Using...  

Broader source: Energy.gov (indexed) [DOE]

More Documents & Publications CHP and Bioenergy Systems for Landfills and Wastewater Treatment Plants CHP and Bioenergy for Landfills and Wastewater Treatment Plants:...

206

Dragonfly Capital | Open Energy Information  

Open Energy Info (EERE)

Dragonfly Capital Dragonfly Capital Jump to: navigation, search Name Dragonfly Capital Place Charlotte, North Carolina Zip 28203 Sector Renewable Energy, Services Product Charlotte-based investment bank providing corporate finance and M&A advisory services to middle market companies, primarily in renewable energy Coordinates 35.2225°, -80.837539° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.2225,"lon":-80.837539,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

207

Ardour Capital | Open Energy Information  

Open Energy Info (EERE)

Ardour Capital Ardour Capital Jump to: navigation, search Name Ardour Capital Investments LLC Address 350 5th ave Place New York, New York Zip 10118 Region Northeast - NY NJ CT PA Area Number of employees 11-50 Year founded 2002 Phone number 2123752950 Website http://www.ardourcapital.com Coordinates 40.74807°, -73.984959° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.74807,"lon":-73.984959,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

208

Cascadia Capital | Open Energy Information  

Open Energy Info (EERE)

Cascadia Capital Cascadia Capital Jump to: navigation, search Name Cascadia Capital Address 701 Fifth Avenue Place Seattle, Washington Zip 98104 Region Pacific Northwest Area Product Investment bank focusing on cleantech deals Website http://www.cascadiacapital.com Coordinates 47.6044155°, -122.3298997° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.6044155,"lon":-122.3298997,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

209

Solar Access to Public Capital | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Solar Access to Public Capital Solar Access to Public Capital The Solar Access to Public Capital (SAPC) working group has developed standard residential lease and commercial power...

210

The Role of Capital Expenditures in Signalling Firm Value  

E-Print Network [OSTI]

and Corporate Capital Expenditure Announcements," PurdueTHE ROLE OF CAPITAL EXPENDITURES IN SIGNALLING FIRM VALUEAngeles THE ROLE OF CAPITAL EXPENDITURES IN SIGNALLING FIRM

Titman, Brett

1983-01-01T23:59:59.000Z

211

Geothermal power plant R and D: an analysis of cost-performance tradeoffs and the Heber Binary-Cycle Demonstration Project  

SciTech Connect (OSTI)

A study of advancements in power plant designs for use at geothermal resources in the low to moderate (300 to 400F) temperature range is reported. In 3 case studies, the benefits of R and D to achieve these advancements are evaluated in terms of expected increases in installed geothermal generating capacity over the next 2 decades. A parametric sensitivity study is discussed which analyzes differential power development for combinations of power plant efficiency and capitol cost. Affordable tradeoffs between plant performance and capital costs are illustrated. The independent review and analysis of the expected costs of construction, operation and maintenance of the Heber Binary Cycle Geothermal Power Demonstration Plant are described. Included in this assessment is an analysis of each of the major cost components of the project, including (1) construction cost, (2) well field development costs, (3) fluid purchase costs, and (4) well field and power plant operation and maintenance costs. The total cost of power generated from the Heber Plant (in terms of mills per kWh) is then compared to the cost of power from alternative fossil-fueled base load units. Also evaluated are the provisions of both: (a) the Cooperative Agreement between the federal government and San Diego Gas and Electric (SDG and E); and (b) the Geothermal Heat Sales Contract with Union Oil Company.

Cassel, T.A.V.; Amundsen, C.B.; Blair, P.D.

1983-06-30T23:59:59.000Z

212

Portland Advancing Green Image With Solar Installs | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Portland Advancing Green Image With Solar Installs Portland Advancing Green Image With Solar Installs Portland Advancing Green Image With Solar Installs February 22, 2010 - 12:10pm Addthis Laura Smoyer checks the net-metering device in her home, which now uses the sun for about 38 percent of its total energy use. | Department of Energy Photo | Laura Smoyer checks the net-metering device in her home, which now uses the sun for about 38 percent of its total energy use. | Department of Energy Photo | Joshua DeLung A quick Web search reveals that many sources consider Portland, Ore., to be one of the most green-minded cities in the United States. But large upfront costs have been a barrier for citizens looking to install solar power systems in the past. Now, a neighborhood solar initiative is helping communities organize to get solar discounts, meaning the city could become

213

Portland Advancing Green Image With Solar Installs | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Portland Advancing Green Image With Solar Installs Portland Advancing Green Image With Solar Installs Portland Advancing Green Image With Solar Installs February 22, 2010 - 12:10pm Addthis Laura Smoyer checks the net-metering device in her home, which now uses the sun for about 38 percent of its total energy use. | Department of Energy Photo | Laura Smoyer checks the net-metering device in her home, which now uses the sun for about 38 percent of its total energy use. | Department of Energy Photo | Joshua DeLung A quick Web search reveals that many sources consider Portland, Ore., to be one of the most green-minded cities in the United States. But large upfront costs have been a barrier for citizens looking to install solar power systems in the past. Now, a neighborhood solar initiative is helping communities organize to get solar discounts, meaning the city could become

214

The Department's Controls over Leased Space in the National Capital Area |  

Broader source: Energy.gov (indexed) [DOE]

The Department's Controls over Leased Space in the National Capital The Department's Controls over Leased Space in the National Capital Area The Department's Controls over Leased Space in the National Capital Area The Department of Energy (Department) manages a sizeable inventory of real property, including both owned and leased properties. The Office of Management is responsible for the Department's real estate function, which includes acquisition by lease or purchase, inventory, utilization surveys, tracking and disposal of real property assets. In Fiscal Year 2007, the Department had approximately 10 million square feet of leased property at a cost of approximately $168 million. This included approximately 2.3 million square feet in the Washington, D.C. metropolitan area costing approximately $45.6 million. The Department's Controls over Leased Space in the National Capital Area

215

Maintenance and repair expenditures: determinants and tradeoffs with new capital goods  

Science Journals Connector (OSTI)

Traditionally economic analysis has focused on new capital investment, while ignoring expenditures to maintain or repair existing stock. Recent, broader theories of replacement have emphasized the important role played by both maintenance and utilization rates. However, the decision to extend the service life of capital has been given scant empirical attention, owing partly to a lack of appropriate data. This study exploits survey data that report annual maintenance/repair expenditures for Canadian manufacturing industries. A standard production framework, modified to incorporate endogenous depreciation, guides the econometric analysis. The empirical results indicate that the cost of capital, among other variables, has a statistically significant effect on maintenance/repair decisions.

J.K. Mullen; Martin Williams

2004-01-01T23:59:59.000Z

216

Startup Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter discusses startup costs for construction and environmental projects, and estimating guidance for startup costs.

1997-03-28T23:59:59.000Z

217

Human Capital Management | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Human Capital Management Human Capital Management Human Capital Management The strategic management of human capital requires comprehensive planning and analysis in order to develop, implement, and evaluate programs that support every facet of employee work life. DOE human capital initiatives are designed to support continuous improvement and accountability in accordance with the DOE Human Capital Management Accountability Program (HCMAP), which is an internal DOE audit process of servicing human resources offices and addresses those documents that require coordination with the Office of the Chief Human Capital Officer before being implemented; Human Resource Directors; the Department's 5-year Strategic Human Capital Management Plan; Departmental element workforce plans; the Department's personnel accountability program that is used

218

Mont Vista Capital LLC | Open Energy Information  

Open Energy Info (EERE)

Vista Capital LLC Vista Capital LLC Jump to: navigation, search Name Mont Vista Capital LLC Place New York, New York Zip 10167 Sector Services Product Mont Vista Capital is a leading global provider of services to clients in the alternative energy industry. Mont Vista also seeks proprietary trading and growth equity opportunities in alternative energy markets which add value for our stakeholders. References Mont Vista Capital LLC[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Mont Vista Capital LLC is a company located in New York, New York . References ↑ "Mont Vista Capital LLC" Retrieved from "http://en.openei.org/w/index.php?title=Mont_Vista_Capital_LLC&oldid=348916"

219

Essays on information technology and intangible capital  

E-Print Network [OSTI]

This thesis consists of three essays related to information technology and intangible capital. The first essay, "Valuing IT-Related Intangible Capital," examines the value of intangible assets in the firm. Using a panel ...

Saunders, Adam

2011-01-01T23:59:59.000Z

220

Forecasting Capital Expenditure with Plan Data  

Science Journals Connector (OSTI)

The short-term forecasting of capital expenditure presents one of the most difficult problems ... reason is that year-to-year fluctuations in capital expenditure are extremely wide. Some simple methods which...

W. Gerstenberger

1977-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "installed capital cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Capital controls and foreign direct investment  

E-Print Network [OSTI]

This paper examines the effect of three types of capital control policies on FDI (a) the existence of multiple exchange rates; (b) restrictions on capital account, and (c) restrictions on the repatriation of export proceeds. ...

Asiedu, Elizabeth; Lien, Donald

2004-03-01T23:59:59.000Z

222

Capital Cooking: Order (2014-CE-23008)  

Broader source: Energy.gov [DOE]

DOE ordered Capital Cooking Equipment, Inc. to pay a $8,000 civil penalty after finding Capital Cooking had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

223

Green Capital Management | Open Energy Information  

Open Energy Info (EERE)

Green Capital Management Place: London, United Kingdom Zip: SW10 0BB Sector: Services Product: The Green Capital Management Fund LP is a private equity fund dedicated to investing...

224

Demographic structure and capital accumulation  

E-Print Network [OSTI]

the paper by Abel [1] on demographic growth and stock prices. Preprint submitted to Elsevier Science 5 rate. Using time series from the United States, Canada and the United Kingdom for the last seventy to a birth-rate increase is to reduce consumption in order to keep capital per capita constant. However

Paris-Sud XI, Université de

225

EM Contractors for Capital Asset Projects  

Broader source: Energy.gov [DOE]

Read the EM Contractors for Capital Asset Projects list, which includes the project name, number, site, and contractor.

226

Capital Expenditure Policy Final V1.0 Approved 110613 -1 -Capital Expenditure  

E-Print Network [OSTI]

Capital Expenditure Policy Final V1.0 Approved 110613 - 1 - Capital Expenditure Policy Version and Risk Committee Audit and Risk Committee: 11 June 2013 (Draft v.11) #12;Capital Expenditure Policy Final on intranet To be referenced during Capital Expenditure training As approved by Audit & Risk Committee 11

Chittka, Lars

227

installed capacity | OpenEI  

Open Energy Info (EERE)

installed capacity installed capacity Dataset Summary Description Estimates for each of the 50 states and the entire United States show Source Wind Powering America Date Released February 04th, 2010 (4 years ago) Date Updated April 13th, 2011 (3 years ago) Keywords annual generation installed capacity usa wind Data application/vnd.ms-excel icon Wind potential data (xls, 102.4 KiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period License License Other or unspecified, see optional comment below Comment Work of the U.S. Federal Government. Rate this dataset Usefulness of the metadata Average vote Your vote Usefulness of the dataset Average vote Your vote Ease of access Average vote Your vote Overall rating Average vote Your vote Comments

228

Solar Installation Labor Market Analysis  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Installation Labor Installation Labor Market Analysis Barry Friedman National Renewable Energy Laboratory Philip Jordan Green LMI Consulting John Carrese San Francisco Bay Area Center of Excellence Technical Report NREL/TP-6A20-49339 December 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Solar Installation Labor Market Analysis Barry Friedman National Renewable Energy Laboratory Philip Jordan Green LMI Consulting John Carrese San Francisco Bay Area Center of Excellence

229

Corruption, Firm Governance, and the Cost of Capital  

E-Print Network [OSTI]

1993,1994) and described by Mauro (1995), Wei (1997), andless economic growth as in Mauro (1995). More broadly, theeconomic development (Mauro, 1995). To dispel the argument

Garmaise, Mark J; Liu, Jun

2005-01-01T23:59:59.000Z

230

Capitalizing on information technology to reduce environmental compliance costs  

SciTech Connect (OSTI)

Over the last several years environmental regulations have proliferated at a pace similar to the explosive growth of micro-computing. The new desktop computing power has encouraged compliance solutions developed in-house using PC based database tools. The result has often been numerous internally developed applications scattered throughout the company, managed or supported by personnel unfamiliar with the underlying principles of the original software. Each individual database may contain redundant and sometimes conflicting data. Expertise on these systems is often not transferable to the next system and may be lost as staff is promoted, transferred, or downsized.

Schott, J. [Entergy Services, Beaumont, TX (United States); Gloski, D.M.; Manning, L.A. [Electric Software Products, Inc., Los Altos, CA (United States)

1996-12-31T23:59:59.000Z

231

Process Improvement at Army Installations  

E-Print Network [OSTI]

and pressed, and the cans are then placed on a conveyor belt. On this conveyor belt, which constitutes one of the production bottlenecks, a plastic cap and starter cap is installed in each can. The final steps for each can include installing the lid... each fuse. Load and Packout When the cans arrive at the Load and Packout building, they are manually removed and loaded on to both sides of a conveyor belt. The conveyor transports the cans to the tape and stencil machine where they are hand...

Northrup, J.; Smith, E. D.; Lin, M.; Baird, J.

232

DOE Announces $27 Million to Reduce Costs of Solar Energy Projects...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Announces 27 Million to Reduce Costs of Solar Energy Projects, Streamline Permitting and Installations DOE Announces 27 Million to Reduce Costs of Solar Energy Projects,...

233

This Flash transmits the second installment under this project. Additional insta  

Broader source: Energy.gov (indexed) [DOE]

This Flash transmits the second installment under this project. Additional installments This Flash transmits the second installment under this project. Additional installments will follow as they are completed. There are two significant chapter revisions in this installment: 6.1, Competition; and 35.1, Scientific and Technical Information. There are also five primarily editorial chapter revisions in this installment, though the revisions include some updated materials as well: 17.2, Cost Participation; 17.4 Program Opportunity Notices; 17.5 Program Research and Development Notices; 22.1, Labor Standards for Construction; and 47.1, Transportation - Air Charter. Finally, three chapters have been removed. Chapter 45, Government Property, was removed because the coverage was obsolete. Chapter 70.1, Cost Participation, was removed because it was duplicative of 17.2 and inappropriate in

234

Mr. Walter Huber, Director Capital Improvements Division National Capital Region  

Office of Legacy Management (LM)

Walter Huber, Director Walter Huber, Director Capital Improvements Division National Capital Region 7th & D Streets, N.W. Washington, D.C. 20407 Dear Mr. Huber: As you may know, the Department of Energy (DOE) is evaluating the radiological condition of sites that were utilized under the Manhattan Engineer District (MED) and the Atomic Energy Commission (AEC) during the early years of nuclear development to determine whether they need remedial action and whether the Department has authority to perform such action. General Services Administration (GSA) was contacted through correspondence with Mr. John P. Allen, Project Director, Special Projects Division of GSA, that the former National Bureau of Standards (NBS) building on Van Ness Street was identified as one such site. This building was used by NBS

235

Commercial equipment cost database  

SciTech Connect (OSTI)

This report, prepared for DOE, Office of Codes and Standards, as part of the Commercial Equipment Standards Program at Pacific Northwest Laboratory, specifically addresses the equipment cost estimates used to evaluate the economic impacts of revised standards. A database including commercial equipment list prices and estimated contractor costs was developed, and through statistical modeling, estimated contractor costs are related to equipment parameters including performance. These models are then used to evaluate cost estimates developed by the ASHRAE 90.1 Standing Standards Project Committee, which is in the process of developing a revised ASHRAE 90.1 standard. The database will also be used to support further evaluation of the manufacturer and consumer impacts of standards. Cost estimates developed from the database will serve as inputs to economic modeling tools, which will be used to estimate these impacts. Preliminary results suggest that list pricing is a suitable measure from which to estimate contractor costs for commercial equipment. Models developed from these cost estimates accurately predict estimated costs. The models also confirm the expected relationships between equipment characteristics and cost. Cost models were developed for gas-fired and electric water heaters, gas-fired packaged boilers, and warm air furnaces for indoor installation. Because of industry concerns about the use of the data, information was not available for the other categories of EPAct-covered equipment. These concerns must be addressed to extend the analysis to all EPAct equipment categories.

Freeman, S.L.

1995-01-01T23:59:59.000Z

236

Certified Capital Companies (Missouri) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Certified Capital Companies (Missouri) Certified Capital Companies (Missouri) Certified Capital Companies (Missouri) < Back Eligibility Agricultural Commercial Construction Developer Fuel Distributor Industrial Institutional Retail Supplier Systems Integrator Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Missouri Program Type Equity Investment Provider Missouri Department of Economic Development Certified Capital Companies (CAPCO), the creation of the Department of Economic Development (DED,) are venture capital firms which have certain requirements to make equity investments in eligible businesses in Missouri. To qualify for CAPCO funding, businesses must be independently owned, headquartered in Missouri and employ less than 200 persons before the

237

Sleeve installations speed pipeline defect repair  

SciTech Connect (OSTI)

Repairing defects in pipelines can be a major challenge for pipeline companies or contractors. To reduce cost and eliminate unscheduled shut downs, pipeline operating companies have adopted ``in-service`` repair methods to restore overall integrity of the pipeline without taking it out of service. Interprovincial Pipe Line Co. has undertaken an aggressive approach to this ``in-service`` repair method by using a developed sleeving system for repairing leaking and non-leaking defects. A structural reinforcement sleeve consists of two non-fillet welded collars (one on each side of the defect) and a full encirclement sleeve welded on top of these collars. The annular space between the pipe and sleeve is filled with a hardenable, non-shrinking epoxy. Three different pressure vessel sleeves can be used for repairing certain defects. They can be used in combination with the pre-stressed sleeve or for independent repairs. This paper reviews the performance and installation of these sleeves.

Friedrich, J.; Smith, J.

1995-12-01T23:59:59.000Z

238

STATE OF CALIFORNIA INSTALLATION CERTIFICATE  

E-Print Network [OSTI]

ENERGY COMMISSION INSTALLATION CERTIFICATE CF-6R-MECH-25-HERS Refrigerant Charge Verification ­ Standard to refrigerant charge verification for compliance, a MECH-24 Certificate (instead of this MECH-25 Certificate) should be used to demonstrate compliance with the refrigerant charge verification requirement. TMAH

239

STATE OF CALIFORNIA INSTALLATION CERTIFICATE  

E-Print Network [OSTI]

ENERGY COMMISSION INSTALLATION CERTIFICATE CF-6R-MECH-26-HERS Refrigerant Charge Verification ­ Alternate are specified in Reference Residential Appendix RA3.2. If refrigerant charge verification is requiredR-MECH-26-HERS Refrigerant Charge Verification ­ Alternate Measurement Procedure (Page 2 of 3) Site

240

Birch Tree Capital | Open Energy Information  

Open Energy Info (EERE)

Tree Capital Tree Capital Jump to: navigation, search Name Birch Tree Capital Place Framingham, Massachusetts Zip 1701 Sector Renewable Energy Product Financial advisory service with a project finance focus that has investor as well a project developer clients. Specialise in renewable power projects generating Federal tax credits and on-site cogeneration projects. References Birch Tree Capital[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Birch Tree Capital is a company located in Framingham, Massachusetts . References ↑ "Birch Tree Capital" Retrieved from "http://en.openei.org/w/index.php?title=Birch_Tree_Capital&oldid=342882" Categories: Clean Energy Organizations

Note: This page contains sample records for the topic "installed capital cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

RAM Capital Management Group | Open Energy Information  

Open Energy Info (EERE)

RAM Capital Management Group RAM Capital Management Group Jump to: navigation, search Name RAM Capital Management Group Place Boca Raton, Florida Zip 33486 Sector Hydro, Hydrogen Product Private VC fund and investment banking advisory firm investing in fuel cells and hydrogen. References RAM Capital Management Group[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. RAM Capital Management Group is a company located in Boca Raton, Florida . References ↑ "RAM Capital Management Group" Retrieved from "http://en.openei.org/w/index.php?title=RAM_Capital_Management_Group&oldid=350184" Categories: Clean Energy Organizations Companies Organizations Stubs What links here Related changes

242

Green Energy Capital Partners | Open Energy Information  

Open Energy Info (EERE)

Capital Partners Capital Partners Jump to: navigation, search Name Green Energy Capital Partners Place Plymouth Meeting, Pennsylvania Zip 19462 Sector Wind energy Product Pennsylvania-based project developer, founded in 2007. Planning PV as well as wind projects in the state as well as overseas. References Green Energy Capital Partners[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Green Energy Capital Partners is a company located in Plymouth Meeting, Pennsylvania . References ↑ "Green Energy Capital Partners" Retrieved from "http://en.openei.org/w/index.php?title=Green_Energy_Capital_Partners&oldid=346013" Categories: Clean Energy Organizations Companies

243

Eco Capital LLC | Open Energy Information  

Open Energy Info (EERE)

Capital LLC Capital LLC Jump to: navigation, search Name Eco Capital LLC Place New York, New York Zip 10166 Sector Carbon, Renewable Energy Product New York-based advisory and investment firm prioritizing activity in renewable energy, clean technology and carbon finance. References Eco Capital LLC[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Eco Capital LLC is a company located in New York, New York . References ↑ "Eco Capital LLC" Retrieved from "http://en.openei.org/w/index.php?title=Eco_Capital_LLC&oldid=344441" Categories: Clean Energy Organizations Companies Organizations Stubs What links here Related changes Special pages Printable version Permanent link

244

Viresco International Capital Management | Open Energy Information  

Open Energy Info (EERE)

Viresco International Capital Management Viresco International Capital Management Jump to: navigation, search Name Viresco International Capital Management Place San Diego, California Zip 92130 Product San Diego-based hedge fund, who recently initiated a fund that will prioritize activity towards clean technology - Viresco Opportunities Global Fund. References Viresco International Capital Management[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Viresco International Capital Management is a company located in San Diego, California . References ↑ "Viresco International Capital Management" Retrieved from "http://en.openei.org/w/index.php?title=Viresco_International_Capital_Management&oldid=352843

245

Climate Human Capital | Open Energy Information  

Open Energy Info (EERE)

Climate Human Capital Climate Human Capital Jump to: navigation, search Name Climate Human Capital Place London, United Kingdom Zip W1K 6NG Sector Carbon, Renewable Energy, Services Product Green executive search company, listed in London's PLUS marketplace since 30 MArch 2010, focusing on the following target sectors: Carbon Markets, Environmental Sciences, Research and Advisory, Financial Services, Renewable Energy Generation and Policy. References Climate Human Capital[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Climate Human Capital is a company located in London, United Kingdom . References ↑ "Climate Human Capital" Retrieved from "http://en.openei.org/w/index.php?title=Climate_Human_Capital&oldid=343709

246

Quadrant Capital Advisors Inc | Open Energy Information  

Open Energy Info (EERE)

Quadrant Capital Advisors Inc Quadrant Capital Advisors Inc Jump to: navigation, search Name Quadrant Capital Advisors Inc. Place New York, New York Zip 10022 Sector Hydro, Wind energy Product US based Private Equity investor in small hydro and wind, mostly in LatAm. References Quadrant Capital Advisors Inc.[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Quadrant Capital Advisors Inc. is a company located in New York, New York . References ↑ "Quadrant Capital Advisors Inc." Retrieved from "http://en.openei.org/w/index.php?title=Quadrant_Capital_Advisors_Inc&oldid=350132" Categories: Clean Energy Organizations Companies Organizations Stubs What links here Related changes

247

Haywood Dorland Energy Capital | Open Energy Information  

Open Energy Info (EERE)

Dorland Energy Capital Dorland Energy Capital Jump to: navigation, search Name Haywood Dorland Energy Capital Place New York, New York Sector Renewable Energy Product New York-based private equity and debt firm that invests in renewable energy companies and projects. References Haywood Dorland Energy Capital[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Haywood Dorland Energy Capital is a company located in New York, New York . References ↑ "Haywood Dorland Energy Capital" Retrieved from "http://en.openei.org/w/index.php?title=Haywood_Dorland_Energy_Capital&oldid=346399" Categories: Clean Energy Organizations Companies Organizations Stubs What links here Related changes

248

Plane Tree Capital LLP | Open Energy Information  

Open Energy Info (EERE)

Plane Tree Capital LLP Plane Tree Capital LLP Jump to: navigation, search Name Plane Tree Capital LLP Place London, United Kingdom Zip W1J 8DY Sector Carbon Product London-based investment management firm established in to provide investors with well managed exposure to the clean energy and carbon sectors. References Plane Tree Capital LLP[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Plane Tree Capital LLP is a company located in London, United Kingdom . References ↑ "Plane Tree Capital LLP" Retrieved from "http://en.openei.org/w/index.php?title=Plane_Tree_Capital_LLP&oldid=349778" Categories: Clean Energy Organizations Companies Organizations Stubs What links here

249

Note on gross capital formation and R&D expenditure  

Science Journals Connector (OSTI)

Companies often consider the cost of R&D projects (especially salaries paid to R&D personnel) as part of their current expenses. Companies continue to do this practice even without exactly specifying what they mean by R&D project costs. This practice is misleading because spending on research is undeniably a form of fixed capital investment, even more so than the item that economists consider as the epitome of fixed capital investment ?? purchase of machinery. The dynamics of the possible relationship between investment in research and investment in machinery is that during times of economic expansion, firms tend to increase their investment in research to come up with product innovations capable of exploiting increasing effectual demand. Over time, this investment results in the emergence of the direct relationship between expense on industrial R&D and the business cycle. We tested this hypothesis both in Italy and in the USA. Our experiments are based on OECD statistics, referring to R&D spending from 1987 to 1999, and on the magnitude 'Gross Capital Formation' in the manufacturing industry. We chose to represent our conjecture about a causal relationship between investment cycle and R&D expenditure econometrically.

Mario De Marchi; Maurizio Rocchi

2005-01-01T23:59:59.000Z

250

Capital E | Open Energy Information  

Open Energy Info (EERE)

E E Jump to: navigation, search Name Capital E Place Washington, Washington, DC Zip DC 20003 Sector Services, Solar Product Capital E is a consulting firm which provides services such as technology evaluation and strategic marketing support for mainly fuel cell and solar power industries. Coordinates 38.89037°, -77.031959° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.89037,"lon":-77.031959,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

251

ADA Requirements for Workplace Charging Installation  

Broader source: Energy.gov [DOE]

Best Practices for installing PEV charging stations in compliance with the Americans with Disabilities Act.

252

Cost analysis of NOx control alternatives for stationary gas turbines  

SciTech Connect (OSTI)

The use of stationary gas turbines for power generation has been growing rapidly with continuing trends predicted well into the future. Factors that are contributing to this growth include advances in turbine technology, operating and siting flexibility and low capital cost. Restructuring of the electric utility industry will provide new opportunities for on-site generation. In a competitive market, it maybe more cost effective to install small distributed generation units (like gas turbines) within the grid rather than constructing large power plants in remote locations with extensive transmission and distribution systems. For the customer, on-site generation will provide added reliability and leverage over the cost of purchased power One of the key issues that is addressed in virtually every gas turbine application is emissions, particularly NO{sub x} emissions. Decades of research and development have significantly reduced the NO{sub x} levels emitted from gas turbines from uncontrolled levels. Emission control technologies are continuing to evolve with older technologies being gradually phased-out while new technologies are being developed and commercialized. The objective of this study is to determine and compare the cost of NO{sub x} control technologies for three size ranges of stationary gas turbines: 5 MW, 25 MW and 150 MW. The purpose of the comparison is to evaluate the cost effectiveness and impact of each control technology as a function of turbine size. The NO{sub x} control technologies evaluated in this study include: Lean premix combustion, also known as dry low NO{sub x} (DLN) combustion; Catalytic combustion; Water/steam injection; Selective catalytic reduction (SCR)--low temperature, conventional, high temperature; and SCONO{sub x}{trademark}.

Bill Major

1999-11-05T23:59:59.000Z

253

Energy Price Indices and Discount Factors for Life-Cycle Cost...  

Office of Environmental Management (EM)

2 Energy Price Indices and Discount Factors for Life-Cycle Cost Analysis - 2012 Report provides tables of present-value factors for use in the life-cycle cost analysis of capital...

254

The effects of the implementation of grey water reuse systems on construction cost and project schedule  

E-Print Network [OSTI]

a positive or negative effect on the design teams decision to implement a grey water reuse system: capital cost, maintenance cost, LEED credits, local plumbing codes, project schedule, local water conservation issues, complexity of the system, etc...

Kaduvinal Varghese, Jeslin

2009-05-15T23:59:59.000Z

255

Assessment of light water reactor power plant cost and ultra-acceleration depreciation financing  

E-Print Network [OSTI]

Although in many regions of the U.S. the least expensive electricity is generated from light-water reactor (LWR) plants, the fixed (capital plus operation and maintenance) cost has increased to the level where the cost ...

El-Magboub, Sadek Abdulhafid.

256

Life Cycle Cost (LCC) Handbook Final Version 9-30-14  

Broader source: Energy.gov [DOE]

This handbook provides procedures, information, examples, and tools to develop consistent and defensible life-cycle cost estimates (LCCE) and perform appropriate life-cycle cost analyses (LCCA) for capital projects. LCC Handbook Final, September 2014

257

Materials that Improve the Cost-Effectiveness of Air Barrier...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

tapes, while having a similar installed cost. Image: Dow Chemical Lead Performer: Oak Ridge National Laboratory - Oak Ridge, TN Partners: -- Dow Chemical - Midland, MI --...

258

Project Profile: High-Concentration, Low-Cost Parabolic Trough...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

aperture, while incorporating additional advancements that substantially lower installed solar field costs. For example, the reflective film surfaces are being upgraded to improve...

259

Extreme Balance of System Hardware Cost Reduction | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Research Corporation: Solar, Install, Mount, Production, Labor, Equipment (SIMPLE BOS) Solexel and Owens Corning: Development and Productization of High-Efficiency, Low-Cost...

260

Facility Energy Decision System (FEDS) Assessment Report for US Army Garrison, Japan - Honshu Installations  

SciTech Connect (OSTI)

This report documents an assessment was performed by a team of engineers from Pacific Northwest National Laboratory (PNNL) under contract to the Installation Management Command (IMCOM) Pacific Region Office (PARO). The effort used the Facility Energy Decision System (FEDS) model to determine how energy is consumed at five U.S. Army Garrison-Japan (USAG-J) installations in the Honshu area, identify the most cost-effective energy retrofit measures, and calculate the potential energy and cost savings.

Kora, Angela R.; Brown, Daryl R.; Dixon, Douglas R.

2010-03-09T23:59:59.000Z

Note: This page contains sample records for the topic "installed capital cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Program and Project Management for the Acquisition of Capital Assets  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The purpose of this Order is to a) provide the Department of Energy (DOE) Elements, including the National Nuclear Security Administration (NNSA), with program and project management direction for the acquisition of capital assets with the goal of delivering projects within the original performance baseline (PB), cost and schedule, and fully capable of meeting mission performance, safeguards and security, and environmental, safety, and health requirements unless impacted by a directed change; and b) implement Office of Management and Budget (OMB) Circulars to include: A-11, Part 7, Capital Programming Guide, which prescribes new requirements and leading practices for project and acquisition management; A-123, Management's Responsibility for Internal Control, which defines management's responsibility for internal control in Federal agencies; and A-131, Value Engineering, which requires that all Federal agencies use Value Engineering (VE) as a management tool. Cancels DOE O 413.3A, Chg 1 dated 6-28-06.

2010-11-29T23:59:59.000Z

262

Capital indivisibility and economic efficiency  

Science Journals Connector (OSTI)

......forward looking costs in line with the...20% of the total cost of the use of the network and supply of energy. (iii) There...counterproductive. (vii) Many renewable sources of energy cannot guarantee...according to future costs (provided major......

W. R. Hodgkins

2014-01-01T23:59:59.000Z

263

NSTAR (Electric) - Small Business Direct Install Program | Department of  

Broader source: Energy.gov (indexed) [DOE]

NSTAR (Electric) - Small Business Direct Install Program NSTAR (Electric) - Small Business Direct Install Program NSTAR (Electric) - Small Business Direct Install Program < Back Eligibility Commercial Local Government Nonprofit State Government Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Other Home Weatherization Commercial Weatherization Sealing Your Home Ventilation Manufacturing Heat Pumps Appliances & Electronics Commercial Lighting Lighting Program Info State Massachusetts Program Type Utility Rebate Program Rebate Amount Up to 70% of the total project cost Provider NSTAR The NSTAR Small Business Solutions Program offers incentives for business customers whose average monthly demand is 300 kW or less. The first step of the program is a free energy audit to identify potential energy saving

264

NREL: Technology Transfer - White Earth Nation Installs Turbines: A Wind  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

White Earth Nation Installs Turbines: A Wind Powering America Success Story White Earth Nation Installs Turbines: A Wind Powering America Success Story February 11, 2013 Almost 8 years after taking the initial steps to harness the wind, the White Earth Nation recently completed the installation of two small wind turbines that will help offset energy costs for Minnesota's largest and most populous Native American reservation. Mike Triplett, economic development planner with the White Earth Development Office, believes that the project represents a unique opportunity for tribal entities in the United States. He noted that tribes don't qualify for tax-based incentives. "And as for working with investors, we never found that to be a viable option," Triplett said. "So we've relied heavily on grants." Funded through nearly $1.8 million in congressional appropriations along

265

Install renewable energy systems | ENERGY STAR Buildings & Plants  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Install renewable energy systems Install renewable energy systems Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In this section Learn the benefits Get started Use Portfolio Manager Save energy Stamp out energy waste Find cost-effective investments Engage occupants Purchase energy-saving products Put computers to sleep Get help from an expert Take a comprehensive approach Install renewable energy systems

266

Industrial heat pumps - types and costs  

SciTech Connect (OSTI)

Confusion about energy savings and economics is preventing many potentially beneficial applications for industrial heat pumps. The variety of heat pumps available and the lack of a standard rating system cause some of this confusion. The authors illustrate how a simple categorization based on coefficient of performance (COP) can compare the cost of recovering waste energy with heat pumps. After evaluating examples in which the cost of energy delivered was calculated based on estimates of capital cost, operating costs, and maintenance costs, they compare heat pumps from the various categories on the basis of economics. 6 references, 6 figures, 1 table.

Chappell, R.N.; Bliem, C.J. Jr.; Mills, J.I.; Demuth, O.J.; Plaster, D.S.

1985-08-01T23:59:59.000Z

267

A Simplified Integrated Model for Studying Transitions to a Hydrogen Economy  

E-Print Network [OSTI]

installations. The hydrogen compressor cost is a function ofand compressor) which increases the cost of hydrogenhydrogen delivery cost. The compressor energy and capital costs

Yang, Christopher; Ogden, Joan M

2004-01-01T23:59:59.000Z

268

Evaluation of Trenchless Installation Technology for Radioactive Wastewater Piping Applications  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Office of Environmental Management (EM) cleanup mission at Oak Ridge National Laboratory (ORNL) includes dispositioning facilities, contaminated legacy materials/waste, and contamination sources and remediation of soil under facilities, groundwater, and surface water to support final Records of Decision (RODs). The Integrated Facilities Disposition Project (IFDP) is a roughly $15B project for completion of the EM mission at Oak Ridge, with a project duration of up to 35 years. The IFDP Mission Need Statement - Critical Decision-0 (CD-0) - was approved by DOE in July 2007, and the IFDP Alternative Selection and Cost Range - Critical Decision-1 (CD-1) - was approved in November 2008. The IFDP scope includes reconfiguration of waste collection and treatment systems as needed to complete the IFDP remediation and decontamination and decommissioning (D&D) missions in a safe and cost-effective manner while maintaining compliance with all governing regulations and bodies and preserving the support of continuing operations at ORNL. A step in the CD-1 approval process included an external technical review (ETR) of technical approaches proposed in the CD-1 document related to the facility reconfiguration for the ORNL radioactive waste and liquid low-level waste management systems. The ETR team recommended that the IFDP team consider the use of trenchless technologies for installing pipelines underground in and around contaminated sites as part of the alternatives evaluations required in support of the CD-2 process. The team specifically recommended evaluating trenchless technologies for installing new pipes in existing underground pipelines as an alternative to conventional open trench installation methods. Potential benefits could include reduction in project costs, less costly underground piping, fewer disruptions of ongoing and surface activities, and lower risk for workers. While trenchless technologies have been used extensively in the sanitary sewer and natural gas pipeline industries, they have been used far less in contaminated environments. Although trenchless technologies have been used at ORNL in limited applications to install new potable water and gas lines, the technologies have not been used in radioactive applications. This study evaluates the technical risks, benefits, and economics for installing gravity drained and pressurized piping using trenchless technologies compared to conventional installation methods for radioactive applications under ORNL geological conditions. A range of trenchless installation technologies was reviewed for this report for general applicability for replacing existing contaminated piping and/or installing new pipelines in potentially contaminated areas. Installation methods that were determined to have potential for use in typical ORNL contaminated environments were then evaluated in more detail for three specific ORNL applications. Each feasible alternative was evaluated against the baseline conventional open trench installation method using weighted criteria in the areas of environment, safety, and health (ES&H); project cost and schedule; and technical operability. The formulation of alternatives for evaluation, the development of selection criteria, and the scoring of alternatives were performed by ORNL staff with input from vendors and consultants. A description of the evaluation methodology and the evaluation results are documented in the following sections of this report.

Robinson, Sharon M [ORNL; Jubin, Robert Thomas [ORNL; Patton, Bradley D [ORNL; Sullivan, Nicholas M [ORNL; Bugbee, Kathy P [ORNL

2009-09-01T23:59:59.000Z

269

Ethanol Capital Management | Open Energy Information  

Open Energy Info (EERE)

Management Jump to: navigation, search Name: Ethanol Capital Management Place: Tucson, Arizona Zip: 85711 Product: Manages funds investing in Ethanol plants in the US Coordinates:...

270

Nimes Capital LLC | Open Energy Information  

Open Energy Info (EERE)

to companies focused on sustainable development, alternative energy, infrastructure, or clean technology. References: Nimes Capital LLC1 This article is a stub. You can help...

271

Applied Intellectual Capital AIC | Open Energy Information  

Open Energy Info (EERE)

Zip: 94501-1010 Product: Applied Intellectual Capital (AIC) was founded in 1999 to fund technology development in clean energy, clean water and sustainable resources. References:...

272

Cora Capital Advisors LLC | Open Energy Information  

Open Energy Info (EERE)

investment bank and financial advisory firm focused on the renewable energy and clean technology sectors. References: Cora Capital Advisors LLC1 This article is a stub....

273

Human Capital Management Accountability Program (HCMAP)  

Broader source: Energy.gov [DOE]

Human Capital Management Accountability Program (HCMAP) is an online program which serves as the vehicle for identifying and measuring these three factors, effectiveness, efficiency, and timeliness...

274

Ambata Capital Partners | Open Energy Information  

Open Energy Info (EERE)

York-based global investment and advisory firm specializing in clean energy and sustainability with a strategic focus on the Middle East and Africa. References: Ambata Capital...

275

Evaporative Roof Cooling- A Simple Solution to Cut Cooling Costs  

E-Print Network [OSTI]

Since the Energy Crisis Evaporative Roof Cooling Systems have gained increased acceptance as a cost effective method to reduce the high cost of air conditioning. Documented case histories in retro-fit installations show direct energy savings...

Abernethy, D.

276

Microsoft PowerPoint - Cost Escalation.ppt  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hydroelectric Design Center Hydroelectric Design Center Hydroelectric Design Center " " Cost Trends for Cost Trends for Hydropower Capital Hydropower Capital Replacements" Replacements" Presentation Outline Presentation Outline A little about HDC A little about HDC Cost Escalation of materials Cost Escalation of materials Issues impacting interest & bids Issues impacting interest & bids Discussion Discussion HDC Expertise HDC Expertise Mission Mission The Hydroelectric Design Center performs The Hydroelectric Design Center performs engineering and design, maintains engineering and design, maintains expertise, and develops standards for the expertise, and develops standards for the US Army Corps of Engineers hydroelectric US Army Corps of Engineers hydroelectric

277

Low Cost Hydrogen Production Platform  

SciTech Connect (OSTI)

A technology and design evaluation was carried out for the development of a turnkey hydrogen production system in the range of 2.4 - 12 kg/h of hydrogen. The design is based on existing SMR technology and existing chemical processes and technologies to meet the design objectives. Consequently, the system design consists of a steam methane reformer, PSA system for hydrogen purification, natural gas compression, steam generation and all components and heat exchangers required for the production of hydrogen. The focus of the program is on packaging, system integration and an overall step change in the cost of capital required for the production of hydrogen at small scale. To assist in this effort, subcontractors were brought in to evaluate the design concepts and to assist in meeting the overall goals of the program. Praxair supplied the overall system and process design and the subcontractors were used to evaluate the components and system from a manufacturing and overall design optimization viewpoint. Design for manufacturing and assembly (DFMA) techniques, computer models and laboratory/full-scale testing of components were utilized to optimize the design during all phases of the design development. Early in the program evaluation, a review of existing Praxair hydrogen facilities showed that over 50% of the installed cost of a SMR based hydrogen plant is associated with the high temperature components (reformer, shift, steam generation, and various high temperature heat exchange). The main effort of the initial phase of the program was to develop an integrated high temperature component for these related functions. Initially, six independent concepts were developed and the processes were modeled to determine overall feasibility. The six concepts were eventually narrowed down to the highest potential concept. A US patent was awarded in February 2009 for the Praxair integrated high temperature component design. A risk analysis of the high temperature component was conducted to identify any potential design deficiency related to the concept. The analysis showed that no fundamental design flaw existed with the concept, but additional simulations and prototypes would be required to verify the design prior to fabricating a production unit. These identified risks were addressed in detail during Phase II of the development program. Along with the models of the high temperature components, a detailed process and 3D design model of the remainder of system, including PSA, compression, controls, water treatment and instrumentation was developed and evaluated. Also, in Phase II of the program, laboratory/fullscale testing of the high temperature components was completed and stable operation/control of the system was verified. The overall design specifications and test results were then used to develop accurate hydrogen costs for the optimized system. Praxair continued development and testing of the system beyond the Phase II funding provided by the DOE through the end of 2008. This additional testing is not documented in this report, but did provide significant additional data for development of a prototype system as detailed in the Phase III proposal. The estimated hydrogen product costs were developed (2007 basis) for the 4.8 kg/h system at production rates of 1, 5, 10, 100 and 1,000 units built per year. With the low cost SMR approach, the product hydrogen costs for the 4.8 kg/h units at 50 units produced per year were approximately $3.02 per kg. With increasing the volume production to 1,000 units per year, the hydrogen costs are reduced by about 12% to $2.67 per kg. The cost reduction of only 12% is a result of significant design and fabrication efficiencies being realized in all levels of production runs through utilizing the DFMA principles. A simplified and easily manufactured design does not require large production volumes to show significant cost benefits. These costs represent a significant improvement and a new benchmark in the cost to produce small volume on-site hydrogen using existing process technologies. The cost mo

Timothy M. Aaron, Jerome T. Jankowiak

2009-10-16T23:59:59.000Z

278

Automated solar collector installation design  

DOE Patents [OSTI]

Embodiments may include systems and methods to create and edit a representation of a worksite, to create various data objects, to classify such objects as various types of pre-defined "features" with attendant properties and layout constraints. As part of or in addition to classification, an embodiment may include systems and methods to create, associate, and edit intrinsic and extrinsic properties to these objects. A design engine may apply of design rules to the features described above to generate one or more solar collectors installation design alternatives, including generation of on-screen and/or paper representations of the physical layout or arrangement of the one or more design alternatives.

Wayne, Gary; Frumkin, Alexander; Zaydman, Michael; Lehman, Scott; Brenner, Jules

2014-08-26T23:59:59.000Z

279

Cost Containment  

Science Journals Connector (OSTI)

Cost containment in health care involves awide ... , the growth rate of expenditure or certain costs of health care services. These measures include ... patient education, etc. The reasons for increased cost ...

2008-01-01T23:59:59.000Z

280

Long-term economic growth stimulus of human capital preservation in the elderly  

Science Journals Connector (OSTI)

...Third, the GDP share of...sustainable energy production...elasticity of demand for health...relative to GDP will be mitigated...increase in per capital medical...growth of per capita benefit liability...projections of the demand for Medicare...to 24% of GDP by 2085...adjusted per annum, per capita health costs...

Kenneth G. Manton; Xi-Liang Gu; Arthur Ullian; H. Dennis Tolley; Alvin E. Headen; Jr; Gene Lowrimore

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "installed capital cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

ACS Installation During SM3B Introduction  

E-Print Network [OSTI]

ACS Installation During SM3B Introduction: · Installed during SM3B in March 2002 · Powerful 3rd · Over-voltage Protection kit installed · Optical Control Electronics connected · New Outer Blanket Layer, and coronagraph ­ Solar Blind Channel (SBC) : HST's most sensitive ultraviolet photon-counting detector 115-180 nm

Sirianni, Marco

282

ATLAS Installation Guide R. Clint Whaley  

E-Print Network [OSTI]

ATLAS Installation Guide R. Clint Whaley November 2, 2007 Abstract This note provides a brief overview of ATLAS, and describes how to install it. It includes extensive discussion of common configure to configure and build the ATLAS package, this note also describes how an installer can confirm

Whaley, R. Clint

283

AUTHORIZING THE ISSUANCE AND SALE OF CAPITAL PROJECTS GENERAL OBLIGATION BONDS TO MAKE CAPITAL EXPENDITURES FOR SENIOR  

E-Print Network [OSTI]

AUTHORIZING THE ISSUANCE AND SALE OF CAPITAL PROJECTS GENERAL OBLIGATION BONDS TO MAKE CAPITAL EXPENDITURES.--For the purpose of providing funds for capital expenditures as authorized in the 2014 Capital Projects General Capital Projects General Obligation Bond Act. SECTION 4. EXPENDITURES.--The proceeds from the sale of #12

Johnson, Eric E.

284

FORSCOM installation characterization and ranking for water efficiency improvement  

SciTech Connect (OSTI)

On March 11, 1994, President Clinton signed Executive Order 12902-Energy Efficiency and Water Conservation at Federal Facilities. Section 302 of the Executive Order calls for energy and water prioritization surveys of federal facilities to be conducted. The surveys will be used to establish priorities for conducting comprehensive facility audits. In response to the requirements of the Executive Order, the U.S. Army Forces Command (FORSCOM) has tasked Pacific Northwest Laboratory (PNL) to initiate a broad study of the water savings potential at each of its major installations. This report provides an assessment of the water, sewer, energy (for hot water production and pumping), and associated cost savings potential at ten of the major FORSCOM installations. This assessment is meant to be a {open_quotes}first pass{close_quotes} estimate of the water savings potential, to assist FORSCOM in prioritizing installations for detailed water audits and potential water efficient retrofits. In addition, the end uses (toilets, sinks, showerheads, irrigation, etc.) with the greatest water savings potential are identified at each installation. This report is organized in the following manner. Following this Introduction, Section 2 provides important background information pertaining to the water analysis. Section 3 describes the methodology employed in the analysis, and Section 4 summarizes the study results. Section 5 prioritizes the installations based on both water/sewer savings and cost associated with water, sewer, and energy savings. Section 6 provides recommendations on where to start detailed water audits, as well as other recommendations. References are listed in Section 7. The appendices provide specific information on the analysis results and methodology, along with a discussion of special issues.

Fitzpatrick, Q.K.; McMordie, K.L.; Di Massa, F.V. [and others

1995-05-01T23:59:59.000Z

285

BluePlanet Capital LLC | Open Energy Information  

Open Energy Info (EERE)

BluePlanet Capital LLC Jump to: navigation, search Name: BluePlanet Capital LLC Place: Washington, Connecticut Zip: 6793 Sector: Services Product: BluePlanet Capital is an...

286

Environmental Capital Group LLC | Open Energy Information  

Open Energy Info (EERE)

Group LLC Group LLC Jump to: navigation, search Name Environmental Capital Group LLC Place Grass Valley, California Zip 95945 Product String representation "Environmental C ... tartup forward." is too long. References Environmental Capital Group LLC[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Environmental Capital Group LLC is a company located in Grass Valley, California . References ↑ "Environmental Capital Group LLC" Retrieved from "http://en.openei.org/w/index.php?title=Environmental_Capital_Group_LLC&oldid=345025" Categories: Clean Energy Organizations Companies Organizations Stubs What links here Related changes Special pages Printable version

287

Flexible Capital Fund (Vermont) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Flexible Capital Fund (Vermont) Flexible Capital Fund (Vermont) Flexible Capital Fund (Vermont) < Back Eligibility Commercial Agricultural Construction Rural Electric Cooperative Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Vermont Program Type Loan Program Provider Vermont Sustainable Jobs Fund The Vermont Sustainable Jobs Fund's Flexible Capital Fund (the "Flex Fund") is designed for companies in Vermont's rural areas that are smaller and work on a less-than global scale, offering a return on investment that does not always meet venture capital levels. These rural companies may need a form of "equity" to fuel growth but need it in lesser amounts and perhaps at lower returns than traditional venture

288

Environmental Capital Partners LLC | Open Energy Information  

Open Energy Info (EERE)

Partners LLC Partners LLC Jump to: navigation, search Name Environmental Capital Partners LLC Place New York, New York Zip 10017 Sector Services Product Private equity firm funded with USD 100m for investment in middle-market companies specialising in green consumer products, building materials, alternative energy, and industrial environmental services. References Environmental Capital Partners LLC[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Environmental Capital Partners LLC is a company located in New York, New York . References ↑ "Environmental Capital Partners LLC" Retrieved from "http://en.openei.org/w/index.php?title=Environmental_Capital_Partners_LLC&oldid=345026"

289

Impact Capital Partners Limited | Open Energy Information  

Open Energy Info (EERE)

Limited Limited Jump to: navigation, search Name Impact Capital Partners Limited Place Los Angeles, California Zip CA 90067-1509 Product Los Angeles-based, investment intermediary that designs financial solutions and innovative strategies for achieving sustained growth and intrinsic value. References Impact Capital Partners Limited[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Impact Capital Partners Limited is a company located in Los Angeles, California . References ↑ "Impact Capital Partners Limited" Retrieved from "http://en.openei.org/w/index.php?title=Impact_Capital_Partners_Limited&oldid=346814" Categories: Clean Energy Organizations Companies

290

Environmental Assessment Kotzebue Wind Installation Project  

Broader source: Energy.gov (indexed) [DOE]

Assessment \ Kotzebue Wind Installation Project Kotzebue, Alaska U. S. Department of Energy Golden Field Office 16 17 Cole Boulevard Golden, Colorado May 1998 Environmental Assessment Kotzebue Wind Installation Project Kotzebue, Alaska U. S . Department of Energy Golden Field Office 1617 Cole Boulevard Golden, Colorado May 1998 Finding of No Significant Impact Environmental Assessment Kotzebue Wind Installation Project Kotzebue, Alaska F'INDING OF NO SIGNIFICANT IMPACT for KOTZEBUE WIND INSTALLATION PROJECT KOTZEBUE, ALASKA AGENCY: Department of Energy, Golden Field Office ACTION: Finding of No Significant Impact SUMMARY: The DOE is proposing to provide financial .assistance to the Kotzebue Electric Association to expand its existing wind installation near Kotzebue, Alaska.

291

DOE Hydrogen Analysis Repository: H2 Fueling Appliances Cost and  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

H2 Fueling Appliances Cost and Performance H2 Fueling Appliances Cost and Performance Project Summary Full Title: H2 Production Infrastructure Analysis - Task 2: Cost and Performance of H2 Fueling Appliances Project ID: 80 Principal Investigator: Brian James Keywords: Costs; steam methane reforming (SMR); autothermal reforming (ATR); hydrogen fueling Purpose The purpose of the analysis was to estimate the capital cost and the resulting cost of hydrogen of several types of methane-fueled hydrogen production systems. A bottoms-up cost analysis was conducted of each system to generate a system design and detailed bill-of-materials. Estimates of the overall capital cost of the hydrogen production appliance were generated. This work supports Systems Analysis Milestone A1. ("Complete techno-economic analysis on production and delivery technologies currently

292

Aquifer thermal energy storage costs with a seasonal heat source.  

SciTech Connect (OSTI)

The cost of energy supplied by an aquifer thermal energy storage (ATES) system from a seasonal heat source was investigated. This investigation considers only the storage of energy from a seasonal heat source. Cost estimates are based upon the assumption that all of the energy is stored in the aquifer before delivery to the end user. Costs were estimated for point demand, residential development, and multidistrict city ATES systems using the computer code AQUASTOR which was developed specifically for the economic analysis of ATES systems. In this analysis the cost effect of varying a wide range of technical and economic parameters was examined. Those parameters exhibiting a substantial influence on ATES costs were: cost of purchased thermal energy; cost of capital; source temperature; system size; transmission distance; and aquifer efficiency. ATES-delivered energy costs are compared with the costs of hot water heated by using electric power or fuel-oils. ATES costs are shown as a function of purchased thermal energy. Both the potentially low delivered energy costs available from an ATES system and its strong cost dependence on the cost of purchased thermal energy are shown. Cost components for point demand and multi-district city ATES systems are shown. Capital and thermal energy costs dominate. Capital costs, as a percentage of total costs, increase for the multi-district city due to the addition of a large distribution system. The proportion of total cost attributable to thermal energy would change dramatically if the cost of purchased thermal energy were varied. It is concluded that ATES-delivered energy can be cost competitive with conventional energy sources under a number of economic and technical conditions. This investigation reports the cost of ATES under a wide range of assumptions concerning parameters important to ATES economics. (LCL)

Reilly, R.W.; Brown, D.R.; Huber, H.D.

1981-12-01T23:59:59.000Z

293

Estimation and decomposition of cost efficiency in the health care food service sector: an extended stochastic frontier approach  

Science Journals Connector (OSTI)

......full-time employees, energy cost, capital, overheads), outputs (number of meals...ln qi , ln wi ; ) - vi /r]. Actual expenditure exceeds minimum cost for either or both...variables because the third input variable (capital) and the environmental variables were......

A. Assaf; K. M. Matawie

2008-01-01T23:59:59.000Z

294

Farm organization and cotton production costs in Comandante Fernandez, Chaco, Argentina  

E-Print Network [OSTI]

relevant in this matter. 'J. ractorized farms have lower proportions of fixed, but higher proportions of operating capital than non-tractorized farms when tenure is controlled. Average total costs per ton of cotton were signi- ficantlyy different only... between trartorized and non- tractorized owners. Average total costs per hectar'- are higher for tractorized than for non-trartoriz~H farms when tenure is controlled, ?oats o& capital items, among indirect cost components, and labor and traction...

Stagno, Horacio Hugo

2012-06-07T23:59:59.000Z

295

Design and installation manual for thermal energy storage  

SciTech Connect (OSTI)

The purpose of this manual is to provide information on the design and installation of thermal energy storage in active solar systems. It is intended for contractors, installers, solar system designers, engineers, architects, and manufacturers who intend to enter the solar energy business. The reader should have general knowledge of how solar heating and cooling systems operate and knowledge of construction methods and building codes. Knowledge of solar analysis methods such as f-Chart, SOLCOST, DOE-1, or TRNSYS would be helpful. The information contained in the manual includes sizing storage, choosing a location for the storage device, and insulation requirements. Both air-based and liquid-based systems are covered with topics on designing rock beds, tank types, pump and fan selection, installation, costs, and operation and maintenance. Topics relevant to latent heat storage include properties of phase-change materials, sizing the storage unit, insulating the storage unit, available systems, and cost. Topics relevant to heating domestic water include safety, single- and dual-tank systems, domestic water heating with air- and liquid-based space heating systems, and stand alone domestics hot water systems. Several appendices present common problems with storage systems and their solutions, heat transfer fluid properties, economic insulation thickness, heat exchanger sizing, and sample specifications for heat exchangers, wooden rock bins, steel tanks, concrete tanks, and fiberglass-reinforced plastic tanks.

Cole, R L; Nield, K J; Rohde, R R; Wolosewicz, R M

1980-01-01T23:59:59.000Z

296

Environmental assessment: Kotzebue Wind Installation Project, Kotzebue, Alaska  

SciTech Connect (OSTI)

The DOE is proposing to provide financial assistance to the Kotzebue Electric Association to expand its existing wind installation near Kotzebue, Alaska. Like many rural Alaska towns, Kotzebue uses diesel-powered generators to produce its electricity, the high cost of which is currently subsidized by the Alaska State government. In an effort to provide a cost effective and clean source of electricity, reduce dependence on diesel fuel, and reduce air pollutants, the DOE is proposing to fund an experimental wind installation to test commercially available wind turbines under Arctic conditions. The results would provide valuable information to other Alaska communities experiencing similar dependence on diesel-powered generators. The environmental assessment for the proposed wind installation assessed impacts to biological resources, land use, electromagnetic interference, coastal zone, air quality, cultural resources, and noise. It was determined that the project does not constitute a major Federal action significantly affecting the quality of the human environment. Therefore, the preparation of an environmental impact statement is not required, and DOE has issued a Finding of No Significant Impact.

NONE

1998-05-01T23:59:59.000Z

297

Residential photovoltaic systems costs  

SciTech Connect (OSTI)

A study of costs associated with the installation and operation of a residential photovoltaic system has been conducted to determine present and projected (1986) status. As a basis for the study, a residential photovoltaic system design projected for 1986 was assumed, consisting of two principal components: a roof-mounted array and a utility-interactive inverter. The scope of the study encompassed both silicon and cadmium sulfide photovoltaic modules. Cost estimates were obtained by a survey and study of reports generated by companies and agencies presently active in each of the subsystem area. Where necessary, supplemental estimates were established as part of this study. The range of estimates for silicon-based systems strongly suggest that such systems will be competitive for new installations and reasonably competitive for retrofit applications. The cadmium-sulfide-based system cost estimates, which are less certain than those for silicon, indicate that these systems will be marginally competitive with silicon-based systems for new construction, but not competitive for retrofit applications. Significant variations from the DOE system price sub-goals were found, however, particularly in the areas of array mounting, wiring and cleaning. Additional development work appears needed in these areas.

Cox, C.H. III

1980-01-01T23:59:59.000Z

298

Help Your Employer Install Electric Vehicle Charging | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Help Your Employer Install Electric Vehicle Charging Help Your Employer Install Electric Vehicle Charging Help Your Employer Install Electric Vehicle Charging Educate your employer...

299

Trends in Gulf Coast Power Supply, Demand, and Costs  

E-Print Network [OSTI]

has sharply driven up capital outlays for new generating stations. Power costs have risen accordingly and will continue to do so for the foreseeable future. Furthermore, the rates of cost increases will vary widely among the utilities on the Gulf Coast...

Posey, L. G., Jr.

1980-01-01T23:59:59.000Z

300

Hydrogen refueling station costs in Shanghai  

E-Print Network [OSTI]

Hydrogen production equipment Puri?er Storage system Compressor Dispenser Additional equipment Installation costshydrogen storage vessels and compressors. 2.4.4. Feedstock costhydrogen equipment costs. Meyers [2] pro- vides an in depth analyses of reformer, compressor, and storage equipment costs.

Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "installed capital cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Cost Estimator  

Broader source: Energy.gov [DOE]

A successful candidate in this position will serve as a senior cost and schedule estimator who is responsible for preparing life-cycle cost and schedule estimates and analyses associated with the...

302

ErgyCapital SpA formerly Greenergy Capital | Open Energy Information  

Open Energy Info (EERE)

ErgyCapital SpA formerly Greenergy Capital ErgyCapital SpA formerly Greenergy Capital Jump to: navigation, search Name ErgyCapital SpA (formerly Greenergy Capital) Place Milan, Italy Zip 20121 Sector Efficiency, Renewable Energy Product Investment company specializing in renewable energy and energy efficiency. Coordinates 45.468945°, 9.18103° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.468945,"lon":9.18103,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

303

Cost reduction potential in LMFBR design  

SciTech Connect (OSTI)

LWR capital costs have escalated continuously over the years to the point where today its economics represent a bar to further LWR deployment in the U.S. High initial costs and the promise of a similar pattern of cost escalation in succeeding years for the LMFBR would effectively stop LMFBR deployment in this country before it could even begin. LWR cost escalation in the main can be traced to large increases in both amounts and unit costs of construction materials and to greatly lengthened construction times. Innovative approaches to LMFBR design are now being pursued that show promise for substantial cost reductions particularly in those areas that have contributed most to LWR cost increases.

Chang, Y.I.; Till, C.E.

1983-08-01T23:59:59.000Z

304

Install Electric Vehicle Charging at Work  

Broader source: Energy.gov [DOE]

Employers who install workplace charging for plug-in electric vehicles (PEVs) demonstrate leadership, show a willingness to adopt advanced technology, and increase consumer exposure and access to...

305

Dynamically installed anchors for floating offshore structures.  

E-Print Network [OSTI]

??The gradual depletion of shallow water hydrocarbon deposits has forced the offshore oil and gas industry to develop reserves in deeper waters. Dynamically installed anchors (more)

Richardson, Mark Damian

2008-01-01T23:59:59.000Z

306

EM, County Install Sewer Line for Development  

Broader source: Energy.gov [DOE]

Crews are installing a sewer line in the Portsmouth site to connect EMs sewer treatment facility to the Pike County Manufacturing Center, which is being developed.

307

Hawaii Well Construction & Pump Installation Standards | Open...  

Open Energy Info (EERE)

and pump installation standards in Hawaii. Author State of Hawaii Commission on Water Resource Management Published State of Hawaii, 22004 DOI Not Provided Check for DOI...

308

Hawaii Well Construction & Pump Installation Standards Webpage...  

Open Energy Info (EERE)

Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Hawaii Well Construction & Pump Installation Standards Webpage Abstract This webpage provides...

309

WINDExchange: U.S. Installed Wind Capacity  

Wind Powering America (EERE)

The animation shows the progress of installed wind capacity between 1999 and 2013. The Energy Department's annual Wind Technologies Market Report provides information about wind...

310

Greenwood Capital Partners | Open Energy Information  

Open Energy Info (EERE)

Greenwood Capital Partners Greenwood Capital Partners Jump to: navigation, search Name Greenwood Capital Partners Place Charlotte, North Carolina Zip 28266 Product Corporate finance boutique working on capital-raising for clean energy companies. Coordinates 35.2225°, -80.837539° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.2225,"lon":-80.837539,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

311

Long Branch Capital | Open Energy Information  

Open Energy Info (EERE)

Branch Capital Branch Capital Jump to: navigation, search Name Long Branch Capital Place Austin, Texas Zip 78744 Sector Efficiency, Renewable Energy Product Long Branch Capital makes minority investments in private companies focused on renewable energy, clean technology, and efficiency Coordinates 30.267605°, -97.742984° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.267605,"lon":-97.742984,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

312

GreenCore Capital | Open Energy Information  

Open Energy Info (EERE)

GreenCore Capital GreenCore Capital Jump to: navigation, search Logo: GreenCore Capital Name GreenCore Capital Address 10509 Vista Sorrento Parkway Place San Diego, California Zip 92121 Region Southern CA Area Product Invests in developing promising renewable energy companies Website http://www.greencorecapital.co Coordinates 32.898095°, -117.215736° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.898095,"lon":-117.215736,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

313

Hereford Capital Advisors | Open Energy Information  

Open Energy Info (EERE)

Hereford Capital Advisors Hereford Capital Advisors Jump to: navigation, search Name Hereford Capital Advisors Place Denver, Colorado Product US-based firm offering PV project management and capital structuring. Coordinates 39.74001°, -104.992259° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.74001,"lon":-104.992259,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

314

Sustainable World Capital | Open Energy Information  

Open Energy Info (EERE)

Atlanta-based firm that connects companies with institutional investors. References: Sustainable World Capital1 This article is a stub. You can help OpenEI by expanding it....

315

Carbon Capital Markets | Open Energy Information  

Open Energy Info (EERE)

Carbon Product: London-based fund manager and trader specialising in the carbon and clean energy markets. References: Carbon Capital Markets1 This article is a stub. You can help...

316

Social Capital in Professional Learning Communities  

E-Print Network [OSTI]

in sociology of education research. Drawing on organizational sociology, this research proposes a model of PLC social capital that treats brokerage (external ties) and closure (internal ties) as the key dimensions of team functioning as proposed by Ron Burt...

Conrady, David P.

2013-05-31T23:59:59.000Z

317

Adage Capital Management, LP ADP Foundation  

E-Print Network [OSTI]

Adage Capital Management, LP ADP Foundation Agilent Technologies, Inc. Air Products Foundation Alcoa Foundation Alexander & Baldwin, Inc. AllianceBernstein Foundation Fund Allstate Foundation Alstom Power, Inc. Altria Group, Inc. American Express Foundation American Institute for Foreign Study American

Napier, Terrence

318

Allocation of Economic Capital in loan portfolios  

Science Journals Connector (OSTI)

Since the seminal of Markowitz (1952) and Sharpe (1964) capital allocation within portfolios is based on the variance/covariance analysis. Even the introduction of Value-at-Risk in order to measure risk more a...

Ludger Overbeck

2000-01-01T23:59:59.000Z

319

Persimmon Tree Capital | Open Energy Information  

Open Energy Info (EERE)

Product: Persimmon is a private equity fund established in 2008 to invest in renewable energy firms. References: Persimmon Tree Capital1 This article is a stub. You can help...

320

Human Capital: Education, Innovation and Health  

Science Journals Connector (OSTI)

Table5.15...shows that, despite the gradual increase in educational expenditure (both in absolute terms and as a ... in the size of the investment in human capital production. Finally, a substantial increase in....

Prof. Panagiotis Petrakis

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "installed capital cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Wind Farm Capital | Open Energy Information  

Open Energy Info (EERE)

Wind Farm Capital Place: Connecticut Sector: Wind energy Product: US-based company that buys wind leases from farmers and landowners, providing an upfront lump sum in exchange for...

322

North Carolina Capital Access Program (North Carolina)  

Broader source: Energy.gov [DOE]

The North Carolina Capital Access Program provides matching reserve funds for business loans that are beyond the traditional lending means of a lenders usual standards. The average CAP loan is ...

323

GUIDELINES FOR CAPITAL PROJECTS INVOLVING DONOR CAMPUS REVIEW  

E-Print Network [OSTI]

. The Accounting Manual addresses appropriation and expenditure of donor funds for capital projects and is attachedGUIDELINES FOR CAPITAL PROJECTS INVOLVING DONOR FUNDS CAMPUS REVIEW Capital projects, regardless capital projects, including donor-funded projects, must have a Building Committee appointed

California at Santa Barbara, University of

324

Capital Development Plan: 2013-18 1. Introduction  

E-Print Network [OSTI]

Capital Development Plan: 2013-18 1. Introduction 1.1 Significant capital expenditure has continued.3 The attached Schedules provide a detailed breakdown of all planned expenditure in the period on capital building projects within the current capital programme. Schedule 2 - profiles projected expenditure

Paxton, Anthony T.

325

The Future of Capital Income Taxation Alan J. Auerbach*  

E-Print Network [OSTI]

expenditure tax is not easily dismissed. Indeed, the case against capital income taxation is stronger now thanThe Future of Capital Income Taxation Alan J. Auerbach* University of California, Berkeley for capital income taxation. The disenchantment with capital income taxes is not new, of course. Joseph

Sadoulet, Elisabeth

326

Low Cost Solar Water Heating R&D  

Broader source: Energy.gov (indexed) [DOE]

Template Template Low Cost Solar Water Heating R&D Kate Hudon National Renewable Energy Laboratory Kate.hudon@nrel.gov 303-275-3190 April 3, 2013 2 | Building Technologies Office eere.energy.gov Purpose & Objectives Problem Statement: The major market barrier for solar water heaters (SWHs) is installed cost. This project addresses this barrier by working with an industry research partner to evaluate innovative solutions that reduce the installed cost of a SWH by

327

Cost Shifting  

Science Journals Connector (OSTI)

Abstract Cost shifting exists when a provider raises prices for one set of buyers because it has lowered prices for some other buyer. In theory, cost shifting can take place only if providers have unexploited market power. The empirical evidence on the extent of cost shifting is mixed. Taken as a whole, the evidence does not support the claims that cost shifting is a large and pervasive feature of the US health-care markets. At most, one can argue that perhaps one-fifth of Medicare payment reductions have been passed on to private payers. The majority of the rigorous studies, however, have found no evidence of cost shifting.

M.A. Morrisey

2014-01-01T23:59:59.000Z

328

Annual Capital Expenditures Survey | Data.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Annual Capital Expenditures Survey Annual Capital Expenditures Survey BusinessUSA Data/Tools Apps Challenges Let's Talk BusinessUSA You are here Data.gov » Communities » BusinessUSA » Data Annual Capital Expenditures Survey Dataset Summary Description Provides national estimates of investment in new and used buildings and other structures, machinery, and equipment by U.S. nonfarm businesses with and without employees. Data are published by industry for companies with employees for NAICS 3-digit and selected 4-digit industries. Data on the amount of business expenditures for new plant and equipment and measures of the stock of existing facilities are critical to evaluate productivity growth, the ability of U.S. business to compete with foreign business, changes in industrial capacity, and measures of overall economic performance. In addition, ACES data provide industry analysts with capital expenditure data for market analysis, economic forecasting, identifying business opportunities and developing new and strategic plans. The ACES is an integral part of the Federal Government's effort to improve and supplement ongoing statistical programs. Private companies and organizations,, educators and students, and economic researchers use the survey results for analyzing and conducting impact evaluations on past and current economic performance, short-term economic forecasts, productivity, long-term economic growth, tax policy, capacity utilization, business fixed capital stocks and capital formation, domestic and international competitiveness trade policy, market research, and financial analysis.

329

An investigation of regulatory and voluntary environmental capital expenditures  

Science Journals Connector (OSTI)

This paper investigates the firm-specific economic consequences of regulatory and voluntary environmental capital expenditures. Using firm-level environmental data, I decompose total environmental capital expenditures into estimates of regulatory and voluntary components. I then examine the relations of regulatory and voluntary environmental capital outlays with future abnormal earnings, stock prices, and stock returns. As predicted, the empirical analysis reveals that regulatory environmental capital expenditures are negatively associated with future abnormal earnings. Moreover, market-based tests indicate that the regulatory component of environmental capital expenditures is negatively priced. Finally, the results suggest that voluntary environmental capital expenditures and regulatory environmental capital expenditures have different firm-specific economic consequences.

Derek Johnston

2005-01-01T23:59:59.000Z

330

A DISTRIBUTED AUTOMATION SYSTEM FOR ELECTROPHYSICAL INSTALLATIONS  

E-Print Network [OSTI]

A DISTRIBUTED AUTOMATION SYSTEM FOR ELECTROPHYSICAL INSTALLATIONS V.R. Kozak Budker Institute There was designed a set of devices for automation systems of physical installations. On this basis approach. KEY WORDS Automation, systems, applications, CANBUS, embedded, controller. 1. Introduction Budker

Kozak, Victor R.

331

Photovoltaic Installations at Williams College Ruth Aronoff  

E-Print Network [OSTI]

generation using solar power. Photovoltaic (PV) panel installations are a simple way for the College facilities, it is now evaluating in detail the environmental impact of these actions. In addition to making1 Photovoltaic Installations at Williams College Ruth Aronoff Williams Luce Project SUMMARY

Aalberts, Daniel P.

332

Chapter 6 - Subsea Cost Estimation  

Science Journals Connector (OSTI)

Publisher Summary This chapter provides guidelines for cost estimation during a project feasibility study, where the accuracy range is between 30% for subsea field development projects. Subsea cost refers to the cost of the whole project, which generally includes the capital expenditures (CAPEX) and operation expenditures (OPEX) of the subsea field development. The feasibility studies are performed before execution of the project, which may include three phases as shown in the figure: prefield development; conceptual/feasibility study; and front-end engineering design (FEED). Cost estimations are made for several purposes, and the methods used for the estimations as well as the desired amount of accuracy will be different. The cost estimation classifications according to Association for the Advancement of Cost Engineering (AACE): level of project definition: expressed as percentage of complete definition; end usage: typical purpose of estimation; methodology: typical estimating method; expected accuracy range: typical range relative to best index of 1; and preparation effort: typical degree of effort relative to least cost index of 1.

Yong Bai; Qiang Bai

2010-01-01T23:59:59.000Z

333

Arduino Tool: For Interactive Artwork Installations  

E-Print Network [OSTI]

The emergence of the digital media and computational tools has widened the doors for creativity. The cutting edge in the digital arts and role of new technologies can be explored for the possible creativity. This gives an opportunity to involve arts with technologies to make creative works. The interactive artworks are often installed in the places where multiple people can interact with the installation, which allows the art to achieve its purpose by allowing the people to observe and involve with the installation. The level of engagement of the audience depends on the various factors such as aesthetic satisfaction, how the audience constructs meaning, pleasure and enjoyment. The method to evaluate these experiences is challenging as it depends on integration between the artificial life and real life by means of human computer interaction. This research investigates "How Adriano fits for creative and interactive artwork installations?" using an artwork installation in the campus of NTNU (Norwegian University...

Shaikh, Murtaza Hussain

2012-01-01T23:59:59.000Z

334

cost savings  

National Nuclear Security Administration (NNSA)

reduced the amount of time involved in the annual chemical inventory for a cost savings of 18,282. Other presentations covered SRNS' award-winning employee suggestion...

335

BPA's Costs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BPAsCosts Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects & Initiatives Finance & Rates...

336

Finding Solutions to Solar's Soft Cost Dilemma | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding Solutions to Solar's Soft Cost Dilemma Finding Solutions to Solar's Soft Cost Dilemma Finding Solutions to Solar's Soft Cost Dilemma January 8, 2013 - 1:22pm Addthis Brian Webster installs rooftop solar panels on a home in Englewood, Colorado. The Energy Department is working to streamline rooftop solar installations so that its faster, easier and cheaper for Americans to go solar. | Photo courtesy of Dennis Schroeder, NREL. Brian Webster installs rooftop solar panels on a home in Englewood, Colorado. The Energy Department is working to streamline rooftop solar installations so that its faster, easier and cheaper for Americans to go solar. | Photo courtesy of Dennis Schroeder, NREL. Minh Le Minh Le Program Manager, Solar Program Learn More about Solar's Soft Costs Check out Clean Power Finance's study on solar's soft costs here.

337

Realistic costs of carbon capture  

SciTech Connect (OSTI)

There is a growing interest in carbon capture and storage (CCS) as a means of reducing carbon dioxide (CO2) emissions. However there are substantial uncertainties about the costs of CCS. Costs for pre-combustion capture with compression (i.e. excluding costs of transport and storage and any revenue from EOR associated with storage) are examined in this discussion paper for First-of-a-Kind (FOAK) plant and for more mature technologies, or Nth-of-a-Kind plant (NOAK). For FOAK plant using solid fuels the levelised cost of electricity on a 2008 basis is approximately 10 cents/kWh higher with capture than for conventional plants (with a range of 8-12 cents/kWh). Costs of abatement are found typically to be approximately US$150/tCO2 avoided (with a range of US$120-180/tCO2 avoided). For NOAK plants the additional cost of electricity with capture is approximately 2-5 cents/kWh, with costs of the range of US$35-70/tCO2 avoided. Costs of abatement with carbon capture for other fuels and technologies are also estimated for NOAK plants. The costs of abatement are calculated with reference to conventional SCPC plant for both emissions and costs of electricity. Estimates for both FOAK and NOAK are mainly based on cost data from 2008, which was at the end of a period of sustained escalation in the costs of power generation plant and other large capital projects. There are now indications of costs falling from these levels. This may reduce the costs of abatement and costs presented here may be 'peak of the market' estimates. If general cost levels return, for example, to those prevailing in 2005 to 2006 (by which time significant cost escalation had already occurred from previous levels), then costs of capture and compression for FOAK plants are expected to be US$110/tCO2 avoided (with a range of US$90-135/tCO2 avoided). For NOAK plants costs are expected to be US$25-50/tCO2. Based on these considerations a likely representative range of costs of abatement from CCS excluding transport and storage costs appears to be US$100-150/tCO2 for first-of-a-kind plants and perhaps US$30-50/tCO2 for nth-of-a-kind plants.The estimates for FOAK and NOAK costs appear to be broadly consistent in the light of estimates of the potential for cost reductions with increased experience. Cost reductions are expected from increasing scale, learning on individual components, and technological innovation including improved plant integration. Innovation and integration can both lower costs and increase net output with a given cost base. These factors are expected to reduce abatement costs by approximately 65% by 2030. The range of estimated costs for NOAK plants is within the range of plausible future carbon prices, implying that mature technology would be competitive with conventional fossil fuel plants at prevailing carbon prices.

Al Juaied, Mohammed (Harvard Univ., Cambridge, MA (US). Belfer Center for Science and International Affiaris); Whitmore, Adam (Hydrogen Energy International Ltd., Weybridge (GB))

2009-07-01T23:59:59.000Z

338

The efficiency of internal capital markets: Evidence from the Annual Capital Expenditure Survey  

Science Journals Connector (OSTI)

Does firm diversity result in an efficient or inefficient allocation of capital? Are diversified firms value creating or value destroying? We apply a panel data model to examine the relationship between firm diversity and firm value using both COMPUSTAT and the Annual Capital Expenditure Survey (ACES) data. Our main empirical result confirms that firm diversity is negatively related to the efficiency of investment (firm value), which is consistent with the majority findings of recent studies. However, once we distinguish between capital expenditure for structures and equipment, we find that while firms do inefficiently allocate capital for equipment, they efficiently allocate capital for structures. These results suggest that when the decision has long-lasting repercussions, headquarters will, more often than not, make the correct choice.

Sumit Agarwal; I-Ming Chiu; Victor Souphom; Guy M. Yamashiro

2011-01-01T23:59:59.000Z

339

Fermentation and costs of fuel ethanol from corn with quick-germ process  

Science Journals Connector (OSTI)

The Quick-Germ process developed at the University of Illinois at Urbana-Champaign is a way to obtain corn oil, but with lower capital costs than the traditional wet-milling process. Quick-Germ has the potential ...

Frank Taylor; Andrew J. Mcaloon

2001-01-01T23:59:59.000Z

340

Rough order of magnitude cost estimate for immobilization of 50MT of plutonium using new faciliites at the Savannah River site: alternative 12A  

SciTech Connect (OSTI)

The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 50 metric tons of plutonium using ceramic in a new facility at Savannah River Site (SRS).

DiSabatino, A., LLNL

1998-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "installed capital cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Chrysalix Energy Venture Capital | Open Energy Information  

Open Energy Info (EERE)

Chrysalix Energy Venture Capital Chrysalix Energy Venture Capital Jump to: navigation, search Logo: Chrysalix Energy Venture Capital Name Chrysalix Energy Venture Capital Address 1367 West Broadway, Suite 400 Place Vancouver, Canada Zip V6H 4A7 Product Venture capital firm. Phone number (604) 659-5499 Website http://www.chrysalix.com/ Coordinates 49.2635735°, -123.1352545° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":49.2635735,"lon":-123.1352545,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

342

Jane Capital Partners | Open Energy Information  

Open Energy Info (EERE)

Jane Capital Partners Jane Capital Partners Jump to: navigation, search Logo: Jane Capital Partners Name Jane Capital Partners Address 505 Montgomery, 2nd Floor Place San Francisco, California Zip 94111 Region Bay Area Product Advisory services, venture capital, investment banking. Year founded 2001 Phone number (415) 277-0180 Website http://www.janecapital.com/ Coordinates 37.794024°, -122.403552° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.794024,"lon":-122.403552,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

343

EnerTech Capital | Open Energy Information  

Open Energy Info (EERE)

EnerTech Capital EnerTech Capital Jump to: navigation, search Logo: EnerTech Capital Name EnerTech Capital Address 625 W. Ridge Pike, Building D, Suite 105 Place Conshohocken, Pennsylvania Zip 19428 Region Northeast - NY NJ CT PA Area Product Venture capital Year founded 1996 Phone number (484) 539-1860 Website http://www.enertechcapital.com Coordinates 40.098246°, -75.3000871° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.098246,"lon":-75.3000871,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

344

Low-Cost Ventilation in Production Housing- Building America Top Innovation  

Broader source: Energy.gov [DOE]

This Building America Innovations profile describes Building America research on simple whole-house ventilation systems that cost less than $350 to install and meet code requirements.

345

Assessing the Environmental Costs and Benefits of Households Electricity Consumption Management.  

E-Print Network [OSTI]

?? In this study the environmental costs and benefits of smart metering technology systems installed in households in Norway have been assessed. Smart metering technology (more)

Segtnan, Ida Lund

2011-01-01T23:59:59.000Z

346

Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.  

SciTech Connect (OSTI)

Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

Richards, Elizabeth H.; Schindel, Kay (City of Madison, WI); Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William (Lindau Companies, Inc., Hudson, WI); Harper, Alan (City of Madison, WI)

2011-12-01T23:59:59.000Z

347

Metabolic systems cost-benefit analysis for interpreting network structure and regulation  

Science Journals Connector (OSTI)

......metabolic pathways The trade-off between capital investment costs and operating costs...and do not include maintenance energy expenditures. The in silico representation of the...operating costs were defined as the expenditure of substrate, either glucose or oxygen......

Ross P. Carlson

2007-05-15T23:59:59.000Z

348

Arctas Capital Group | Open Energy Information  

Open Energy Info (EERE)

Arctas Capital Group Arctas Capital Group Jump to: navigation, search Name Arctas Capital Group Place Houston, Texas Zip 77056 Sector Geothermal energy, Renewable Energy, Wind energy Product A Houston-based investment and project development firm focusing on multiple energy technologies including renewables wind and geothermal. Coordinates 29.76045°, -95.369784° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":29.76045,"lon":-95.369784,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

349

Starlight Capital Advisors | Open Energy Information  

Open Energy Info (EERE)

Starlight Capital Advisors Starlight Capital Advisors Jump to: navigation, search Name Starlight Capital Advisors Place Carlsbad, California Zip 92011 Sector Renewable Energy Product California-based investment banking boutique focused on providing financial and strategic advice to project developers in renewables. Coordinates 31.60396°, -100.641609° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":31.60396,"lon":-100.641609,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

350

American Wind Capital | Open Energy Information  

Open Energy Info (EERE)

Capital Capital Place Essex, Connecticut Zip 64260 Sector Wind energy Product Connecticut-based American Wind Capital buys wind leases from farmers and landowners in the US, providing an upfront lump sum in exchange for the long-term royalty rights. Coordinates 44.511005°, -73.058204° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.511005,"lon":-73.058204,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

351

Black Coral Capital | Open Energy Information  

Open Energy Info (EERE)

Coral Capital Coral Capital Jump to: navigation, search Name Black Coral Capital Address 55 Union Street, 3rd Floor Place Boston, Massachusetts Zip 02108 Region Greater Boston Area Product Cleantech private equity Number of employees 1-10 Website [www.blackcoralcapital.com www.blackcoralcapital.com ] Coordinates 42.3615754°, -71.0572318° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.3615754,"lon":-71.0572318,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

352

Sindicatum Carbon Capital SCC | Open Energy Information  

Open Energy Info (EERE)

Sindicatum Carbon Capital SCC Sindicatum Carbon Capital SCC Jump to: navigation, search Name Sindicatum Carbon Capital (SCC) Place London, United Kingdom Zip W1S 1HX Product SCC is a specialist end-to-end developer of climate change related projects, from conception to operation. Coordinates 51.506325°, -0.127144° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.506325,"lon":-0.127144,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

353

Report: Human Capital Discussion and Observations  

Broader source: Energy.gov (indexed) [DOE]

Human Capital Discussion, Human Capital Discussion, Observations, and Recommendations August 24, 2006 Submitted by: Mr. A. James Barnes and Mr. Dennis Ferrigno Background: During the March 23-24, 2006 EMAB Public Meeting, Assistant Secretary for Environmental Management (EM-1), James Rispoli, asked the EMAB members to pursue a review of EM Human Capital issues. Although the National Academy of Public Administration (NAPA) is also conducting a review of this topic - the results of which will be available in October 2007 - Mr. Rispoli instructed EMAB to identify areas that need improvement and make recommendations to begin bettering the program now. EMAB focused specifically on the areas of: Morale/Workplace Census Planning/Accountability Training/Certification

354

Ethanol Capital Funding | Open Energy Information  

Open Energy Info (EERE)

Capital Funding Capital Funding Jump to: navigation, search Name Ethanol Capital Funding Place Atlanta, Georgia Zip 30328 Product Provides funding for ethanol and biodiesel plants. Coordinates 33.748315°, -84.391109° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.748315,"lon":-84.391109,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

355

New Energy Capital Corp | Open Energy Information  

Open Energy Info (EERE)

Capital Corp Capital Corp Jump to: navigation, search Name New Energy Capital Corp. Place Hanover, New Hampshire Zip 3755 Sector Renewable Energy Product Private equity fund focused on investments in renewable energy, distributed generation and energy productivity projects. Coordinates 37.5677°, -81.795392° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.5677,"lon":-81.795392,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

356

Walnut Capital Acquisitions | Open Energy Information  

Open Energy Info (EERE)

Acquisitions Acquisitions Jump to: navigation, search Name Walnut Capital Acquisitions Place Pittsburgh, Pennsylvania Zip 15232 Product Walnut Capital Acquisitions is the project development arm of Walnut Capital, one of Pittsburgh's largest and fastest growing real estate management, development and brokerage companies. Coordinates 40.438335°, -79.997459° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.438335,"lon":-79.997459,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

357

Emerging Edge Capital EEC | Open Energy Information  

Open Energy Info (EERE)

Edge Capital EEC Edge Capital EEC Jump to: navigation, search Name Emerging Edge Capital (EEC) Place London, United Kingdom Zip SW1Y 4RS Sector Renewable Energy Product London-based company which sources and develops projects in renewable energy and other strategic sectors in emerging markets. Coordinates 51.506325°, -0.127144° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.506325,"lon":-0.127144,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

358

Absolut Energy Capital | Open Energy Information  

Open Energy Info (EERE)

Absolut Energy Capital Absolut Energy Capital Jump to: navigation, search Name Absolut Energy Capital Place London, England, United Kingdom Zip W1H - 6HN Sector Renewable Energy Product London-based private equity firm. The firm offers financing for renewable energy ventures. Coordinates 51.506325°, -0.127144° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.506325,"lon":-0.127144,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

359

American Capital Energy | Open Energy Information  

Open Energy Info (EERE)

American Capital Energy American Capital Energy Name American Capital Energy Address 15 Tyngsboro Rd. Suite 4A Place North Chelmsford, Massachusetts Zip 01863 Sector Solar Product solar electric systems Phone number (866) 307-5370 Website http://www.americancapitalener Coordinates 42.640998°, -71.3857514° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.640998,"lon":-71.3857514,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

360

Transmission Capital Limited | Open Energy Information  

Open Energy Info (EERE)

Capital Limited Capital Limited Jump to: navigation, search Name Transmission Capital Limited Place London, United Kingdom Zip EC2V 7HR Sector Renewable Energy, Services Product String representation "Provides adviso ... y arrangements." is too long. Coordinates 51.506325°, -0.127144° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.506325,"lon":-0.127144,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "installed capital cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Life-Cycle Cost Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Life-Cycle Cost Analysis Life-Cycle Cost Analysis Life-Cycle Cost Analysis October 16, 2013 - 4:41pm Addthis Constructed Costs of a Net-Zero Office Building Facility: Research Support Facility at the National Renewable Energy Laboratory in Golden, Colorado Operational: August 2010 Constructed cost: $259/ft2 to achieve 50% less energy use than code Constructed cost of similar office buildings in area: $225 to $300/ft2 Reaching Net-Zero: A 1.27 MW photovoltaic system was added to the project in two phases to bring the system to net-zero. This system was financed through a power purchase agreement and did not add to the constructed cost of the building. If those costs were included in the capital costs, the total constructed cost would have been 291/ft2 to reach net-zero energy use. Learn more about the Research Support

362

Estimate Costs to Implement Greenhouse Gas Mitigation Strategies Using  

Broader source: Energy.gov (indexed) [DOE]

Costs to Implement Greenhouse Gas Mitigation Strategies Costs to Implement Greenhouse Gas Mitigation Strategies Using Renewable Energy in Buildings Estimate Costs to Implement Greenhouse Gas Mitigation Strategies Using Renewable Energy in Buildings October 7, 2013 - 11:25am Addthis After determining the best greenhouse gas (GHG) reduction strategies using renewable energy, a Federal agency should estimate the cost of implementing them in a building or buildings. There are several cost factors that need to be considered when developing a renewable energy project. Capital costs, fixed and variable operations and maintenance (O&M) costs and in the case of biomass and waste-to-energy projects, fuel costs all contribute to the total cost of operating a renewable energy system. The levelized system cost takes into account these

363

Clean Cities: Capital District Clean Communities (Albany) coalition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Capital District Clean Communities (Albany) Coalition Capital District Clean Communities (Albany) Coalition The Capital District Clean Communities (Albany) coalition works with vehicle fleets, fuel providers, community leaders, and other stakeholders to reduce petroleum use in transportation. Capital District Clean Communities (Albany) coalition Contact Information Jennifer Ceponis 518-458-2161 jceponis@cdtcmpo.org Coalition Website Clean Cities Coordinator Jennifer Ceponis Photo of Jennifer Ceponis Jennifer Ceponis has been the coordinator of Capital District Clean Communities Coalition since 2012. Ceponis is a Senior Transportation Planner at the Capital District Transportation Committee (CDTC), where she worked since 2008 on bicycle and pedestrian planning, transportation demand management programs and community planning. The Clean Communities Coalition

364

Installed Geothermal Capacity | Open Energy Information  

Open Energy Info (EERE)

Geothermal Capacity Geothermal Capacity Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Print PDF Installed Geothermal Capacity International Market Map of U.S. Geothermal Power Plants List of U.S. Geothermal Power Plants Throughout the world geothermal energy is looked at as a potential source of renewable base-load power. As of 2005 there was 8,933 MW of installed power capacity within 24 countries. The International Geothermal Association (IGA) reported 55,709 GWh per year of geothermal electricity. The generation from 2005 to 2010 increased to 67,246 GWh, representing a 20% increase in the 5 year period. The IGA has projected that by 2015 the new installed capacity will reach 18,500 MW, nearly 10,000 MW greater than 2005. [1] Countries with the greatest increase in installed capacity (MW) between

365

File:Install.pdf | Open Energy Information  

Open Energy Info (EERE)

Install.pdf Install.pdf Jump to: navigation, search File File history File usage File:Install.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 86 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 13:48, 1 November 2012 Thumbnail for version as of 13:48, 1 November 2012 1,275 × 1,650 (86 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage There are no pages that link to this file. Retrieved from "http://en.openei.org/w/index.php?title=File:Install.pdf&oldid=53281

366

Property:InstalledCapacity | Open Energy Information  

Open Energy Info (EERE)

InstalledCapacity InstalledCapacity Jump to: navigation, search Property Name InstalledCapacity Property Type Quantity Description Installed Capacity (MW) or also known as Total Generator Nameplate Capacity (Rated Power) Use this property to express potential electric energy generation, such as Nameplate Capacity. The default unit is megawatts (MW). For spatial capacity, use property Volume. Acceptable units (and their conversions) are: 1 MW,MWe,megawatt,Megawatt,MegaWatt,MEGAWATT,megawatts,Megawatt,MegaWatts,MEGAWATT,MEGAWATTS 1000 kW,kWe,KW,kilowatt,KiloWatt,KILOWATT,kilowatts,KiloWatts,KILOWATT,KILOWATTS 1000000 W,We,watt,watts,Watt,Watts,WATT,WATTS 1000000000 mW,milliwatt,milliwatts,MILLIWATT,MILLIWATTS 0.001 GW,gigawatt,gigawatts,Gigawatt,Gigawatts,GigaWatt,GigaWatts,GIGAWATT,GIGAWATTS

367

Performance of Installed Cooking Exhaust Devices  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Performance of Installed Cooking Exhaust Devices Performance of Installed Cooking Exhaust Devices Brett C. Singer, William W. Delp, Michael G. Apte, Philip N. Price Environmental Energy Technologies Division Lawrence Berkeley National Laboratory Berkeley, California, 94720 November 2011 Direct funding for this research was provided by the California Energy Commission through Contracts 500-05-026 and 500-08-061. Institutional support is provided to LBNL by the U.S. Department of Energy, Office of Science under Contract DE-AC02-05CH11231. LBNL-5265E-r1(3) Singer et al., Performance of Installed Cooking Exhaust Devices LBNL-5265E-r1(3) Performance of Installed Cooking Exhaust Devices Brett C. Singer 1

368

Cryogenic UHV installation for scanning tunneling microscopy  

Science Journals Connector (OSTI)

In this work we describe a helium cryostat with an ultrahigh vacuum chamber for placing the STM [H. By means of this installation it is possible to perform sample treatmentin situ (breaking, annealing, ion etchin...

V. S. Edelman; I. N. Khlyustikov

1996-01-01T23:59:59.000Z

369

Peoples Gas Single Family Direct Install (Illinois)  

Broader source: Energy.gov [DOE]

Owners of single-family homes, condos, townhomes and two-flats may be eligible for a free installation of new programmable thermostats, pipe insulation, showerheads, and faucet aerators through...

370

CRSP South Capital Investment Plan FY12-FY21 Detail  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

9/2011 9/2011 CRSP South Capital Investment Plan FY12-FY21 Detail Yellow Highlight = New Project to list W Total = Western Only Costs Red Text = Change from previous version O Total = Trust and Joint Participation Costs Blue Text = will be removed from list FY Total = Sum of W Total and O Total Green Highlight = Annual Equipment Replacement Programs MPS Split = Multiple Power System Cost Split. Fund PROJECT PROJECT Power Sys TOTAL W Total W PD W Non-PD O Total FY TOTAL W Total W PD W Non-PD O Total FY TOTAL Transmission Lines Environmental Support for Lands, Access Roads, and ROW's CRSPVMF 450 110 10 100 110 110 10 100 110 Lidar Closeout at Pinnacle Peak and Rogers CRSPVMF 15 15 15 15 Pinnacle Peak-Rogers ROW Agreement CRSPVMF 6,100 6,100 100 6,000 6,100 T-Line SubTotal 6,565 125 25 100 125 6,210 110

371

CATEGORICAL EXCLUSION FOR INSTALLING A PHOTOVOLTAIC  

Broader source: Energy.gov (indexed) [DOE]

-PNSO-0657 -PNSO-0657 CATEGORICAL EXCLUSION FOR INSTALLING A PHOTOVOLTAIC POWER GENERATION ARRAY AND ELECTRIC CAR CHARGING STATIONS, ENVIRONMENTAL MOLECULAR SCIENCES LABORATORY, PACIFIC NORTHWEST SITE OFFICE, RICHLAND, WASHINGTON Proposed Action The U.S. Department of Energy (DOE), Pacific Northwest Site Office (PNSO) proposes to install a photovoltaic power generation array and electric car charging stations. Location of Action The proposed action would occur in a landscaped infiltration swale located immediately

372

Economic and Conservation Evaluation of Capital Renovation Project: Hidalgo County Irrigation District No. 2 (San Juan) - Relining Lateral A Preliminary  

E-Print Network [OSTI]

; Nick Palacios. These engineers and managers with the Texas Water Development Board (TWDB) have provided valuable feedback on the methodology and data, as well as insights on accommodating the requirements.../TCE economists to investigate the economic and conservation merits of capital renovation projects proposed by Rio Grande Basin Irrigation Districts. RGIDECON facilitates integration and analysis of information pertaining to proposed projects costs, productive...

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

373

New Jersey SmartStart Buildings - Direct Install Program | Department of  

Broader source: Energy.gov (indexed) [DOE]

New Jersey SmartStart Buildings - Direct Install Program New Jersey SmartStart Buildings - Direct Install Program New Jersey SmartStart Buildings - Direct Install Program < Back Eligibility Commercial Industrial Local Government Nonprofit Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Other Construction Appliances & Electronics Commercial Lighting Lighting Manufacturing Maximum Rebate Lesser of 70% of project costs or $75,000 per project; annual entity cap of $250,000 Program Info Funding Source New Jersey Societal Benefits Charge (public benefits fund); ARRA State New Jersey Program Type State Rebate Program Rebate Amount Varies Provider c/o TRC Energy Services The Direct Install program offers turn-key energy efficiency solutions to qualified industrial and commercial customers that, with some exceptions,

374

Energy Department Launches SunShot Prize Competition to Install Solar  

Broader source: Energy.gov (indexed) [DOE]

SunShot Prize Competition to Install SunShot Prize Competition to Install Solar Energy Systems at a Fraction of Today's Price Energy Department Launches SunShot Prize Competition to Install Solar Energy Systems at a Fraction of Today's Price September 12, 2012 - 2:27pm Addthis News Media Contact (202) 586-4940 WASHINGTON - As part of the Energy Department's SunShot Initiative, which is working to make solar energy competitive with other forms of energy without subsidy by the end of the decade, the Energy Department today announced the start of a new competition to make it faster, easier, and cheaper to install rooftop solar energy systems. The SunShot Prize makes a total of $10 million in cash awards available to the first three teams that repeatedly demonstrate the non-hardware costs, or price to plug

375

ConEd (Gas and Electric) - Small Business Direct Install Program (New York)  

Broader source: Energy.gov (indexed) [DOE]

ConEd (Gas and Electric) - Small Business Direct Install Program ConEd (Gas and Electric) - Small Business Direct Install Program (New York) ConEd (Gas and Electric) - Small Business Direct Install Program (New York) < Back Eligibility Commercial Savings Category Other Appliances & Electronics Commercial Lighting Lighting Heating & Cooling Commercial Heating & Cooling Program Info State New York Program Type Utility Rebate Program Rebate Amount Energy Survey: Free Programmable Thermostat: Free Equipment Upgrades Identified in Energy Survey: Con Edison will pay up to 70% of the remaining cost directly to the contractor ConEd is providing free energy surveys to its small business customers. The survey will take 30 to 90 minutes and efficiency opportunities and associated costs will be presented on the spot. If the customer agrees to

376

The focus of the human capital management portion of the Departments efforts to achieve the Presidents Management Agenda has  

Broader source: Energy.gov (indexed) [DOE]

Strategic Use of Human Capital Our human capital management (HCM) efforts have been focused on establishing a systematic and comprehensive process for improving the Department of Energy with the principle goal of meeting our mission objectives for American citizens. These efforts have resulted in an integrated approach that ensures human capital programs and policies are linked to the Department's missions, strategies and goals, while providing for continuous improvement in efficiency and effectiveness while reducing costs. Within the Department, senior managers of the individual program and staff offices are responsible for successfully accomplishing their organization's missions. They are also responsible for

377

Cost Study for Large Wind Turbine Blades  

SciTech Connect (OSTI)

The cost study for large wind turbine blades reviewed three blades of 30 meters, 50 meters, and 70 meters in length. Blade extreme wind design loads were estimated in accordance with IEC Class I recommendations. Structural analyses of three blade sizes were performed at representative spanwise stations assuming a stressed shell design approach and E-glass/vinylester laminate. A bill of materials was prepared for each of the three blade sizes using the laminate requirements prepared during the structural analysis effort. The labor requirements were prepared for twelve major manufacturing tasks. TPI Composites developed a conceptual design of the manufacturing facility for each of the three blade sizes, which was used for determining the cost of labor and overhead (capital equipment and facilities). Each of the three potential manufacturing facilities was sized to provide a constant annual rated power production (MW per year) of the blades it produced. The cost of the production tooling and overland transportation was also estimated. The results indicate that as blades get larger, materials become a greater proportion of total cost, while the percentage of labor cost is decreased. Transportation costs decreased as a percentage of total cost. The study also suggests that blade cost reduction efforts should focus on reducing material cost and lowering manufacturing labor, because cost reductions in those areas will have the strongest impact on overall blade cost.

ASHWILL, THOMAS D.

2003-05-01T23:59:59.000Z

378

Estimating Renewable Energy Costs | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Estimating Renewable Energy Costs Estimating Renewable Energy Costs Estimating Renewable Energy Costs October 16, 2013 - 4:40pm Addthis Some renewable energy measures, such as daylighting, passive solar heating, and cooling load avoidance, do not add much to the cost of a building. However, renewable energy technologies typically require large, additional capital investments with savings accruing over the project's life. It is crucial that these systems are considered early on in the budgeting process. Early budget requests need to include a set of technologies that could be used to meet the project's design requirements and their associated implementation costs. The design team may respond with a different set of feasible technologies, but it is wise to have an existing placeholder in the budget. Federal agencies can continue to update the budget as decisions

379

Industrial heat pumps: types and costs  

SciTech Connect (OSTI)

Many potentially beneficial applications for industrial heat pumps are not being pursued because of confusion regarding both energy savings and economics. Part of this confusion stems from the variety of heat pumps available and the fact that the measure of merit, the coefficient of performance (COP), is commonly defined in at least three different ways. In an attempt to circumvent this problem, a simple categorization was developed based on the commonly accepted COP definitions. Using this categorization, the cost of recovering waste energy with heat pumps was examined. Examples were evaluated in which the cost of energy delivered was calculated based on estimates of capital cost, operating costs, and maintenance costs. Heat pumps from the various categories were then compared on the basis of economics.

Chappell, R.N.; Bliem, C.J. Jr.; Mills, J.I.; Demuth, O.J.; Plaster, D.S.

1985-03-01T23:59:59.000Z

380

Industrial heat pumps - types and costs  

SciTech Connect (OSTI)

Many potentially beneficial applications for industrial heat pumps are not being pursued because of confusion regarding both energy savings and economics. Part of this confusion stems from the variety of heat pumps available and the fact that the measure of merit, the coefficient of performance (COP) is commonly defined in at least three different ways. In an attempt to circumvent this problem, a simple categorization was developed based on the commonly accepted COP definitions. Using this categorization, the cost of recovering waste energy with heat pumps was examined. Examples were evaluated in which the cost of energy delivered was calculated based on estimates of capital cost, operating costs, and maintenance costs. Heat pumps from the various categories were then compared on the basis of economics. 6 refs., 7 figs.

Chappell, R.N.; Bliem, C.J. Jr.; Mills, J.I.; Demuth, O.J.; Plaster, D.S.

1985-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "installed capital cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Cost Effectiveness Analysis for Conservation Investments  

E-Print Network [OSTI]

of investment capital as the principal reason for the abundance of cost effective The Alliance to Save Energy is a nonprofit conservation projects awaiting funding. In coalition of business, labor, government, many firms the in-practice "hurdle rates... considered. Assume, for example, that natural gas prices are expected to escalate and oil prices are expected to remain constant. If these assumptions are not reflected in the quantitative assessment of IRR, the relatively greater attractiveness of gas...

Reid, M. W.

1984-01-01T23:59:59.000Z

382

Pulsar Energy Capital L L P | Open Energy Information  

Open Energy Info (EERE)

Pulsar Energy Capital L L P Pulsar Energy Capital L L P Jump to: navigation, search Name Pulsar Energy Capital L.L.P. Place London, United Kingdom Zip SW20 0PU Product Pulsar Energy Capital LLP is a private equity firm that invests in high growth companies in the energy sector. References Pulsar Energy Capital L.L.P.[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Pulsar Energy Capital L.L.P. is a company located in London, United Kingdom . References ↑ "Pulsar Energy Capital L.L.P." Retrieved from "http://en.openei.org/w/index.php?title=Pulsar_Energy_Capital_L_L_P&oldid=350046" Categories: Clean Energy Organizations Companies Organizations Stubs What links here Related changes

383

2011-2015 Human Capital Management Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

This Human Capital Management Plan (HCMP or Plan) shows how we intend to recruit, hire, train, develop, and retain such employees. 2011-2015 Human Capital Management Plan More...

384

Essays on human capital and financial economics by Jialan Wang.  

E-Print Network [OSTI]

This thesis consists of three essays examining issues related to human capital, careers, and financial economics. In the first chapter, I examine how the process of corporate bankruptcy varies by human capital intensity ...

Wang, Jialan, Ph.D. Massachusetts Institute of Technology

2010-01-01T23:59:59.000Z

385

Students Storm the Capital: 2013 National Science Bowl | Department...  

Broader source: Energy.gov (indexed) [DOE]

Students Storm the Capital: 2013 National Science Bowl Students Storm the Capital: 2013 National Science Bowl April 26, 2013 - 4:46pm Addthis Right now, teams of middle and high...

386

Japan lifts bars slightly on foreign capital investment  

Science Journals Connector (OSTI)

Japan lifts bars slightly on foreign capital investment ... Last week, after months (actually years) of debate, Japan took its first tentative steps toward liberalizing the rules that govern foreign capital investment when the cabinet approved the government's decontrol plan. ...

1967-06-12T23:59:59.000Z

387

Tax policies, vintage capital, and exit and entry of plants  

E-Print Network [OSTI]

Following Chamley, Lucas, Laitner, and Aiyagari, this dissertation continues to explore the answer for the question of zero capital taxation by discussing how taxes on capital income, labor income, and property affect the economy in the context of a...

Chang, Shao-Jung

2006-04-12T23:59:59.000Z

388

CE2 Carbon Capital LLC | Open Energy Information  

Open Energy Info (EERE)

Capital LLC Jump to: navigation, search Name: CE2 Carbon Capital LLC Place: California Sector: Carbon, Renewable Energy Product: US-based carbon trader that looks to take positions...

389

Marathon Capital LLC (Illinois) | Open Energy Information  

Open Energy Info (EERE)

Marathon Capital LLC (Illinois) Marathon Capital LLC (Illinois) Jump to: navigation, search Logo: Marathon Capital LLC (Illinois) Name Marathon Capital LLC (Illinois) Address 2801 Lakeside Drive, Suite 210 Place Bannockburn, Illinois Zip 60015 Product Investment banking firm providing services to global energy, infrastructure and project finance markets Phone number (847) 574-2670 Website http://marathon-cap.com/ Coordinates 42.202995°, -87.88451° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.202995,"lon":-87.88451,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

390

MVP Capital Partners | Open Energy Information  

Open Energy Info (EERE)

MVP Capital Partners MVP Capital Partners Jump to: navigation, search Logo: MVP Capital Partners Name MVP Capital Partners Address 201 King of Prussia Road, Suite 240 Place Radnor, Pennsylvania Zip 19087 Region Northeast - NY NJ CT PA Area Product Makes equity investments in growing later-stage companies and also provides equity financing for acquisitions and recapitalizations Phone number (610) 254-2999 Website http://www.mvpcapitalpartners. Coordinates 40.0428319°, -75.3567351° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.0428319,"lon":-75.3567351,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

391

Energy Capital Solutions | Open Energy Information  

Open Energy Info (EERE)

Energy Capital Solutions Energy Capital Solutions Name Energy Capital Solutions Address 2651 North Harwood Street, Suite 410 Place Dallas, Texas Zip 75201 Region Texas Area Product Investment banking firm focused on rainsing private capital and providing advisory services to public and private energy companies Phone number (214) 219-8200 Website http://www.energycapitalsoluti Coordinates 32.792857°, -96.806504° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.792857,"lon":-96.806504,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

392

Sustainable Technology Capital, LP | Open Energy Information  

Open Energy Info (EERE)

Technology Capital, LP Technology Capital, LP Jump to: navigation, search Logo: Sustainable Technology Capital, LP Name Sustainable Technology Capital, LP Address 625 Liberty Ave., Suite 3200 Place Pittsburgh, Pennsylvania Zip 15222 Region Northeast - NY NJ CT PA Area Number of employees 1-10 Year founded 2005 Phone number 412 497 5700 Website http://www.stechcapital.com/ Coordinates 40.442424°, -80.000746° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.442424,"lon":-80.000746,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

393

Expansion Capital Partners LLC | Open Energy Information  

Open Energy Info (EERE)

Expansion Capital Partners LLC Expansion Capital Partners LLC Jump to: navigation, search Name Expansion Capital Partners LLC Address One Embarcadero Center, Suite 4100 Place San Francisco, California Zip 94111 Region Bay Area Product Venture capital firm that invests in expansion-stage, clean technology enterprises Year founded 2001 Phone number (415) 788-8802 Website http://www.expansioncapital.co Coordinates 37.794497°, -122.39962° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.794497,"lon":-122.39962,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

394

Beetle Capital Partners | Open Energy Information  

Open Energy Info (EERE)

Beetle Capital Partners Beetle Capital Partners Jump to: navigation, search Logo: Beetle Capital Partners Name Beetle Capital Partners Address Medici Court, 67-69 New Bond Street Place London, United Kingdom Zip W1S 1UA Product Private Equity and Managed Assets Number of employees 11-50 Website http://www.beetlecapitalpartne Coordinates 51.5134598°, -0.1456882° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.5134598,"lon":-0.1456882,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

395

Prospect Capital Corporation | Open Energy Information  

Open Energy Info (EERE)

Prospect Capital Corporation Prospect Capital Corporation Jump to: navigation, search Logo: Prospect Capital Corporation Name Prospect Capital Corporation Address 10 East 40th Street, 44th Floor Place New York, New York Zip 10016 Region Northeast - NY NJ CT PA Area Product Mezzanine debt and private equity firm. Stock Symbol PSEC Phone number (212) 448-0702 Website http://www.prospectstreet.com/ Coordinates 40.751592°, -73.981323° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.751592,"lon":-73.981323,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

396

Consumption Oriented Free Capitalism Qiudong Wang  

E-Print Network [OSTI]

Consumption Oriented Free Capitalism Qiudong Wang An economic system is a framework, under which people are organized to produce consumption-goods and to consume the produced. Concerning economic of consumption, which in turn not only hindered further improvement of overall productivity, but also threatened

Wang, Quidong

397

The Trend of Global Capitalism Qiudong Wang  

E-Print Network [OSTI]

to well- developed camp but the rest goes to under-developed category. In this essay I will discuss from industrial revolution, West Europe Capitalism in the nineteenth century was engaged century. After that, western powers re-evaluated their imperialistic policy and saw a fundamental dilemma

Wang, Quidong

398

Stress Testing Projected Capitalized Farmland Values  

E-Print Network [OSTI]

that current year real cash rent can be best explained by current year real net farm income, lagged real net farm income over a period of years, and real cash rent in the previous year. A spreadsheet simulation model is used to project capitalized farmland...

Gao, Bo 1988-

2012-11-12T23:59:59.000Z

399

FY95 capital asset implementation plan  

SciTech Connect (OSTI)

The Waste Isolation Division (WID) is committed to providing good stewardship for the capital assets under its operational and physical control. To achieve this goal, the WID has developed the Capital Asset Implementation Plan (CAIP) to continue to implement for FY95 Department of Energy (DOE) Order 4320.2A, Capital Asset Management Process (CAMP). The Order provides policy and elements needed to establish a credible, consistent, auditable, and technically sound process for the DOE to forecast, plan, and budget for capital assets on a functional unit level. The objective of the WIPP CAMP program is to meet the goals of DOE Order 4320.2A in the most effective and efficient manner possible in support of the Waste Isolation Pilot Plant (WIPP) mission. As a result, this CAIP provides a way to implement the CAMP Program using a graded approach. Continued implementation will be accomplished by improving the existing process, and establishing future goals to promote growth for the CAMP Program. The CAIP is issued annually by the WID with quarterly progress reports submitted to the DOE. This document describes the current-year program staffing, roles, responsibilities, funding, and near-term milestones. In addition, the results of past goals are discussed.

Not Available

1994-12-01T23:59:59.000Z

400

Workplace Charging Challenge Partner: Capital One Financial Corporatio...  

Broader source: Energy.gov (indexed) [DOE]

Corporation Capital One's Environmental Program seeks to reduce greenhouse gas (GHG) emissions throughout the organization's facilities and business practices. Since...

Note: This page contains sample records for the topic "installed capital cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

A hedge fund business plan : investment theory, operations, and capital raising for Broadgates Capital Management  

E-Print Network [OSTI]

Launching a start-up hedge fund is a complex, multifaceted endeavor that requires an understanding of the interconnectivity between capital raising, investment strategy, regulation, and fund operations. The purpose of this ...

Mills, Jeffrey David

2014-01-01T23:59:59.000Z

402

SunShot Initiative Installs Solar Energy System | Department...  

Office of Environmental Management (EM)

SunShot Initiative Installs Solar Energy System SunShot Initiative Installs Solar Energy System Addthis 1 of 10 SunShot Initiative team members install a solar energy system on a...

403

Experimental Evaluation of Installed Cooking Exhaust Fan Performance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Experimental Evaluation of Installed Cooking Exhaust Fan Performance Experimental Evaluation of Installed Cooking Exhaust Fan Performance Title Experimental Evaluation of Installed Cooking Exhaust Fan Performance Publication Type Report LBNL Report Number LBNL-4183E Year of Publication 2010 Authors Singer, Brett C., William W. Delp, and Michael G. Apte Publisher Lawrence Berkeley National Laboratory City Berkeley Keywords airflow & pollutant transport group, cooktop, energy analysis and environmental impacts department, gas burners, indoor air quality, indoor environment department, kitchen, nitrogen dioxide, oven, pollutant emissions, range hood, residential, source control, task ventilation, technology, sustainability and impact assessment group Abstract The installed performance of cooking exhaust fans was evaluated through residential field experiments conducted on a sample of 15 devices varying in design and other characteristics. The sample included two rear downdraft systems, two under-cabinet microwave over range (MOR) units, three different installations of an under-cabinet model with grease screens across the bottom and no capture hood, two devices with grease screens covering the bottom of a large capture hood (one under-cabinet, one wall-mount chimney), four under-cabinet open hoods, and two open hoods with chimney mounts over islands. Performance assessment included measurement of airflow and sound levels across fan settings and experiments to quantify the contemporaneous capture efficiency for the exhaust generated by natural gas cooking burners. Capture efficiency is defined as the fraction of generated pollutants that are removed through the exhaust and thus not available for inhalation of household occupants. Capture efficiency (CE) was assessed for various configurations of burner use (e.g. single front, single back, combination of one front and one back, oven) and fan speed setting. Measured airflow rates were substantially lower than the levels noted in product literature for many of the units. This shortfall was observed for several units costing in excess of $1000. Capture efficiency varied widely (from <5% to roughly 100%) across devices and across conditions for some devices. As expected, higher capture efficiencies were achieved with higher fan settings and the associated higher air flow rates. In most cases, capture efficiencies were substantially higher for rear burners than for front burners. The best and most consistent performance was observed for open hoods that covered all cooktop burners and operated at higher airflow rates. The lowest capture efficiencies were measured when a front burner was used with a rear backdraft system or with lowest fan setting for above the range systems that do not cover the front burners.

404

Capital Expenditures, Financial Constraints, and the Use of Options  

E-Print Network [OSTI]

Capital Expenditures, Financial Constraints, and the Use of Options Tim Adam RMI Working Paper No@nus.edu.sg 1 #12;Capital Expenditures, Financial Constraints, and the Use of Options Abstract This paper of the author and do not necessarily reflect the views of NUS Risk Management Institute (RMI). #12;Capital

Chaudhuri, Sanjay

405

Page 1 of 40 Capital market frictions, Leasing and Investment  

E-Print Network [OSTI]

capital expenditures and reducing the sensitivity of investment expenditures to availability of internal be the only option. So, does leasing positively affect the capital expenditure of lessee firms? Does leasingPage 1 of 40 Capital market frictions, Leasing and Investment Vasantha Rao Chigurupati Ph

Saskatchewan, University of

406

Capital market impact of product marketing strategy: Evidence from the relationship between advertising expenses and cost of capital  

Science Journals Connector (OSTI)

To analyze the prospect of a firms advertising decision affecting shareholder wealth, this article investigates the relationship between a firms advertising expenditure and the market-imposed weighted average c...

Manohar Singh; Sheri Faircloth

2005-01-01T23:59:59.000Z

407

New England Wind Forum: Cost Trends  

Wind Powering America (EERE)

Cost Trends Cost Trends Figure 1: Cost of Energy and Cumulative Domestic Capacity This graph shows how the cumulative domestic wind capacity (MW) has increased since 1980, while the cost of energy from wind power has declined by a factor of approximately 20 times during the same period but has increased slightly since 2001. Click on the image to view a larger version. This graph shows how the cumulative domestic wind capacity (MW) has increased since 1980, while the cost of energy from wind power has declined by a factor of approximately 20 times during the same period but has increased slightly since 2001. View a larger version of the graph. Overall, the wind industry is experiencing long-term decreases in the cost to produce wind-generated electricity (Figure 1), despite recent short-term increases in upfront equipment costs. Even in the short term, however, the effect of increases in up-front capital costs on the cost of energy from wind power projects has been dampened by improvements in energy capture from the wind and decreases in operating and maintenance costs.

408

An examination of the costs and critical characteristics of electric utility distribution system capacity enhancement projects  

SciTech Connect (OSTI)

This report classifies and analyzes the capital and total costs (e.g., income tax, property tax, depreciation, centralized power generation, insurance premiums, and capital financing) associated with 130 electricity distribution system capacity enhancement projects undertaken during 1995-2002 or planned in the 2003-2011 time period by three electric power utilities operating in the Pacific Northwest. The Pacific Northwest National Laboratory (PNNL), in cooperation with participating utilities, has developed a large database of over 3,000 distribution system projects. The database includes brief project descriptions, capital cost estimates, the stated need for each project, and engineering data. The database was augmented by additional technical (e.g., line loss, existing substation capacities, and forecast peak demand for power in the area served by each project), cost (e.g., operations, maintenance, and centralized power generation costs), and financial (e.g., cost of capital, insurance premiums, depreciations, and tax rates) data. Though there are roughly 3,000 projects in the database, the vast majority were not included in this analysis because they either did not clearly enhance capacity or more information was needed, and not available, to adequately conduct the cost analyses. For the 130 projects identified for this analysis, capital cost frequency distributions were constructed, and expressed in terms of dollars per kVA of additional capacity. The capital cost frequency distributions identify how the projects contained within the database are distributed across a broad cost spectrum. Furthermore, the PNNL Energy Cost Analysis Model (ECAM) was used to determine the full costs (e.g., capital, operations and maintenance, property tax, income tax, depreciation, centralized power generation costs, insurance premiums and capital financing) associated with delivering electricity to customers, once again expressed in terms of costs per kVA of additional capacity. The projects were sorted into eight categories (capacitors, load transfer, new feeder, new line, new substation, new transformer, reconductoring, and substation capacity increase) and descriptive statistics (e.g., mean, total cost, number of observations, and standard deviation) were constructed for each project type. Furthermore, statistical analysis has been performed using ordinary least squares regression analysis to identify how various project variables (e.g., project location, the primary customer served by the project, the type of project, the reason for the upgrade, size of the upgrade) impact the unit cost of the project.

Balducci, Patrick J.; Schienbein, Lawrence A.; Nguyen, Tony B.; Brown, Daryl R.; Fathelrahman, Eihab M.

2004-06-01T23:59:59.000Z

409

Alternative Fuels Data Center: Installation of Alternative Fuel Components  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Installation of Installation of Alternative Fuel Components in Vehicles to someone by E-mail Share Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on Facebook Tweet about Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on Twitter Bookmark Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on Google Bookmark Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on Delicious Rank Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on Digg Find More places to share Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on AddThis.com... More in this section... Federal

410

Utah Underground Storage Tank Installation Permit | Open Energy...  

Open Energy Info (EERE)

Underground Storage Tank Installation Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: Utah Underground Storage Tank Installation Permit Form Type...

411

High-performance computer system installed at Los Alamos National...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

High-performance computer system installed at Lab High-performance computer system installed at Los Alamos National Laboratory New high-performance computer system, called Wolf,...

412

Utility Scale Renewable Energy Development Near DOD Installations...  

Broader source: Energy.gov (indexed) [DOE]

Utility Scale Renewable Energy Development Near DOD Installations: Making the Case for Land Use Compatitbility Utility Scale Renewable Energy Development Near DOD Installations:...

413

H2-Assisted NOx Traps: Test Cell Results Vehicle Installations...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

H2-Assisted NOx Traps: Test Cell Results Vehicle Installations H2-Assisted NOx Traps: Test Cell Results Vehicle Installations 2003 DEER Conference Presentation: ArvinMeritor...

414

Obama Administration Announces Plans to Install New Solar Panels...  

Broader source: Energy.gov (indexed) [DOE]

Plans to Install New Solar Panels on the White House Residence Obama Administration Announces Plans to Install New Solar Panels on the White House Residence October 5, 2010 -...

415

Reduce generating costs and eliminate brownouts  

SciTech Connect (OSTI)

Improving the manoeuverability of a coal-fired plant to allow it to participate in primary frequency support will reduce generation cost and minimize brownouts. The challenge is to do so without compromising efficiency or emissions. This article describes an approach - activation of stored energy - that is cost-effective and applicable to both greenfield and brownfield installations. It requires a new control philosophy, plus the correct application of new level and flow measurement 'best practices'. 4 refs., 1 tab.

Nogaja, R.; Menezes, M. [Emerson Process Management (United States)

2007-06-15T23:59:59.000Z

416

Electricity costs  

Science Journals Connector (OSTI)

... index is used to correct for inflation. The short answer is given by the Central Electricity Generating Board's (CEGB's) 1980-81 report, paragraph 168. "The ... Generating Board's (CEGB's) 1980-81 report, paragraph 168. "The cost per kWh of fuel. . . rose by 18.6 per cent (between 1979 ...

J.W. JEFFERY

1982-03-18T23:59:59.000Z

417

ESPC ENABLE | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

process so that a project can be designed and installed quickly. Other traditional ESPC benefits include: Zero upfront capital costs to the agency Guaranteed energy cost savings...

418

Rough order of magnitude cost estimate for immobilization of 18.2 MT of plutonium sharing existing facilities at Hanford with pit disassembly {ampersand} conversion facility: alternative 2  

SciTech Connect (OSTI)

The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 18.2 metric tons (nominal) of plutonium as a ceramic in an existing facility at Hanford, the Fuels and Materials Examination Facility (FMEF). The Pit Disassembly and Conversion Facility (PDCF), which is being costed in a separate report will also be located in the FMEF in this co- location option. The technical engineering data used as the basis for this study is presented in the EIS Data Call Input Report, `Plutonium Immobilization Plant Using Ceramic in Existing Facilities at Hanford.` The FMEF will require minimal facility modifications to accommodate the Plutonium Immobilization Plant (PIP). Adequate space is available within the FMEF for installation of the immobilization process equipment. Facility HVAC, utility, and support systems exist to support the immobilization operations. Building modifications are primarily the removal of the SAF line (gloveboxes and support equipment) on the 70` level and building interior changes. The plutonium immobilization equipment will primarily occupy the 42` and 70` levels of the FMEF, with the same equipment layout as in the sole occupancy case. The Pit Disassembly and Conversion Facility would occupy the 21` and O` (Entry) levels. Elements of the FMEF and adjacent Fuel Assembly Area (FAA) that will be shared by PIP and PDCF include shipping and receiving, laboratory, waste handling, security, offices, maintenance shops, SNM storage vault, and utilities. It was assumed that the existing utilities and support systems are adequate or only need minor upgrades to support both the PIP and PDCF. The PIP cost estimate was reconciled with the PDCF cost estimate to confirm the use and costs of shared systems and personnel. The facility design for a 50 metric ton plutonium throughput plant will be used for the 18.2 metric ton facility. Plutonium conversion operations will operate at the same design rate as the 50 metric ton facility over the 10 year operating period. Some of the process equipment will operate for a shorter period of time and fewer operators will be required. The assumptions, missions, design bases, facility and process descriptions, and accident analyses are the same. Therefore it is assumed that the capital cost for the 18.2 metric ton facility is identical to that of the 50 metric ton facility. However, the following operating costs will be less: consumable materials, equipment replacement and maintenance labor, employment requirements, and waste generation.

DiSabatino, A., LLNL

1998-06-01T23:59:59.000Z

419

Energy and Environmental Capital LLC | Open Energy Information  

Open Energy Info (EERE)

Environmental Capital LLC Environmental Capital LLC Jump to: navigation, search Name Energy and Environmental Capital LLC Place Washington, DC Sector Carbon Product The company focuses on carbon trading in ex-Soviet countries. References Energy and Environmental Capital LLC[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Energy and Environmental Capital LLC is a company located in Washington, DC . References ↑ "Energy and Environmental Capital LLC" Retrieved from "http://en.openei.org/w/index.php?title=Energy_and_Environmental_Capital_LLC&oldid=344829" Categories: Clean Energy Organizations Companies Organizations Stubs What links here Related changes Special pages Printable version

420

Noventi Venture Capital formerly CIR Ventures | Open Energy Information  

Open Energy Info (EERE)

Noventi Venture Capital formerly CIR Ventures Noventi Venture Capital formerly CIR Ventures Jump to: navigation, search Name Noventi Venture Capital (formerly CIR Ventures) Place Menlo Park, California Zip CA 94025 Product Noventi (formerly CIR Ventures, aka Cypress Ventures, part of the CIR Group) is an early-stage venture capital firm actively looking for investment opportunities that focus on the convergence of technology, energy, and the environment. References Noventi Venture Capital (formerly CIR Ventures)[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Noventi Venture Capital (formerly CIR Ventures) is a company located in Menlo Park, California . References ↑ "Noventi Venture Capital (formerly CIR Ventures)"

Note: This page contains sample records for the topic "installed capital cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Sustainable Energy Capital Partners SECP | Open Energy Information  

Open Energy Info (EERE)

Capital Partners SECP Capital Partners SECP Jump to: navigation, search Name Sustainable Energy Capital Partners (SECP) Place Santa Ana, California Zip 92705 Sector Renewable Energy Product California-based renewable energy project developer. References Sustainable Energy Capital Partners (SECP)[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Sustainable Energy Capital Partners (SECP) is a company located in Santa Ana, California . References ↑ "Sustainable Energy Capital Partners (SECP)" Retrieved from "http://en.openei.org/w/index.php?title=Sustainable_Energy_Capital_Partners_SECP&oldid=351911" Categories: Clean Energy Organizations Companies Organizations Stubs

422

HOCL Installation Guide Chen WANG, Thierry PRIOL  

E-Print Network [OSTI]

Chemical Language) is a chemical programming language. Compu- tations can be seen as chemical reactions which are controlled by a set of chemical rules. We have an HOCL compiler developed in JAVA. This manual shows you how to install Java SDK in your machine. HOCL compiler is developed under Java platform, so

Boyer, Edmond

423

Installing Small Wind Turbines Seminar and Workshop  

E-Print Network [OSTI]

Seminar and Workshop Installing Small Wind Turbines Seminar and Workshop Location: Murdoch January 2011 Details for Registration and Payment: Mr Daniel Jones, National Small Wind Turbine Test: The National Small Wind Turbine Centre at Murdoch University is holding a Small Wind Turbine short training

424

Standard hydrogen monitoring system equipment installation instructions  

SciTech Connect (OSTI)

This document provides the technical specifications for the equipment fabrication, installation, and sitework construction for the Standard Hydrogen Monitoring System. The Standard Hydrogen Monitoring System is designed to remove gases from waste tank vapor space and exhaust headers for continual monitoring and remote sample analysis.

Schneider, T.C.

1996-09-27T23:59:59.000Z

425

IEA HPP Annex 36 Installation/Quality  

E-Print Network [OSTI]

compiled and reviewed last week during meeting at EdF 10-11 October 2013 Submit final report to IEA HPP Ex#12;IEA HPP Annex 36 ­ Quality Installation/Quality Maintenance Van D. Baxter Oak Ridge National), USA 3 10-11 October 2013 EdF, France 4 12 May 2014 Workshop at IEA Heat Pump conference, Montreal

Oak Ridge National Laboratory

426

Offshore Wind Turbines and Their Installation  

Science Journals Connector (OSTI)

Offshore winds tend to be higher, more constant and not disturbed by rough terrain, so there is a large potential for utilizing wind energy near to the sea. Compared with the wind energy converters onland, wind turbine components offshore will subject ... Keywords: renewable energy, wind power generation, offshore wind turbines, offshore installation

Liwei Li; Jianxing Ren

2010-01-01T23:59:59.000Z

427

Overview of Rocky Mountain Region's Capital Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Planning Workshop Planning Workshop Overview of Western's Current Transmission Planning Activities Robert H. Easton aeaston@wapa.gov (970) 461-7272 Transmission Planning - North Loveland, CO June 21, 2011 1 Transmission Planning Workshop AGENDA - 10-Yr Network Study Process NERC TPL- Study Process Capital Investment Plan 2 Transmission Planning Workshop 2011 10-YR Network Load Forecast Study and Process Transmission Planning Loveland, CO June 21, 2011 3 Purpose  Evaluate the steady state load serving capability of the integrated system.  Identify problem areas due to projected system load growth.  Allows for inclusion of necessary projects in Capital Investment Plan (CIP).  Ensure that system development keeps pace with load growth in order to continue serving Preference

428

Energy Capital Investments | Open Energy Information  

Open Energy Info (EERE)

Name Energy Capital Investments Name Energy Capital Investments Place Phoenix, Arizona Zip 85016 Product An investment firm established by Najafi Companies with the specific purpose of investing in clean energy projects and companies. Coordinates 33.44826°, -112.075774° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.44826,"lon":-112.075774,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

429

Capital Markets Climate Initiative | Open Energy Information  

Open Energy Info (EERE)

Markets Climate Initiative Markets Climate Initiative Jump to: navigation, search Name Capital Markets Climate Initiative Agency/Company /Organization World Economic Forum Partner UK Department of Energy and Climate Sector Climate Topics Finance, Low emission development planning, -LEDS Website http://www.decc.gov.uk/en/cont Country India, Kenya, South Africa, Mexico, Tanzania Southern Asia, Eastern Africa, Southern Africa, Central America, Eastern Africa References CMCI[1] World Economic Forum[2] The Capital Markets Climate Initiative (CMCI) is a public-private initiative designed to support the scale up of private finance flows for low carbon technologies, solutions and infrastructure in developing economies by: Developing a common understanding amongst policy makers of why and

430

Conservation Capital LLC | Open Energy Information  

Open Energy Info (EERE)

Conservation Capital LLC Conservation Capital LLC Place Houston, Texas Zip 77018 Product Houston-based land investment and consulting company focused on sustainable and economically profitable strategies for conserving environmental assets. Coordinates 29.76045°, -95.369784° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":29.76045,"lon":-95.369784,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

431

Atlantic Ethanol Capital | Open Energy Information  

Open Energy Info (EERE)

Atlantic Ethanol Capital Atlantic Ethanol Capital Place Washington, Washington, DC Product Biofuel Investor in Caribbean and Central American region. Coordinates 38.89037°, -77.031959° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.89037,"lon":-77.031959,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

432

New Energy Capital | Open Energy Information  

Open Energy Info (EERE)

Logo: New Energy Capital Name New Energy Capital Address 53 South Main Street, Third Floor Place Hanover, New Hampshire Zip 03755 Product Focuses on financing, building, owning, and operating clean energy assets Phone number (603) 643-8885 Website http://www.newenergycapital.co Coordinates 43.7022928°, -72.2895353° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.7022928,"lon":-72.2895353,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

433

Absolute Energy Capital | Open Energy Information  

Open Energy Info (EERE)

Absolute Energy Capital Absolute Energy Capital Place London, United Kingdom Zip SW1Y 5NQ Product London-based private equity firm. Coordinates 51.506325°, -0.127144° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.506325,"lon":-0.127144,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

434

Capital Electric Coop, Inc | Open Energy Information  

Open Energy Info (EERE)

Capital Electric Coop, Inc Capital Electric Coop, Inc Place North Dakota Utility Id 2985 Utility Location Yes Ownership C NERC Location MRO NERC MRO Yes Activity Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Annual Rates - Irrigation (Rate Class 131) Commercial Annual Rates- Irrigation (Rate Class 130) Industrial Commercial( Rate class: 040,050,060) Commercial Commercial-UC-1(Rate Class: 061) Commercial Commercial-UC-2(Rate Class: 041, 062) Commercial Electric Heat With Over 1,000 KW of Heating Load Commercial Electric Heat(Separate Meter) Commercial

435

Rough order of magnitude cost estimate for immobilization of 18.2 MT of plutonium using existing facilities at the Savannah River site: alternatives 3A/5A/6A/6B/7A/9A  

SciTech Connect (OSTI)

The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 18.2 metric tons (nominal) of plutonium using ceramic in a new facility at Savannah River Site (SRS).

DiSabatino, A., LLNL

1998-06-01T23:59:59.000Z

436

Low Cost, High Performance, 50-year Electrode  

Broader source: Energy.gov (indexed) [DOE]

this ARPA-E project, Primus Power will develop an this ARPA-E project, Primus Power will develop an extremely durable, highly active, conductive, and inexpensive electrode for flow batteries. Flow batteries offer one of the most exciting opportunities for affordable grid storage, however electrodes are costly and are the single largest cost component in a well integrated design. Grid storage can yield numerous benefits in utility and customer- owned applications:  renewable firming  peak load reduction  load shifting  capital deferral  frequency regulation By incorporating volume production practices from the chlorine, filter media, and electroplating industries, Primus Power will effectively reduce electrode costs to exceed GRIDS cost targets while providing the durability essential for widespread grid-scale adoption.

437

NREL: Energy Analysis - Levelized Cost of Energy Calculator  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Levelized Cost of Energy Calculator Levelized Cost of Energy Calculator Transparent Cost Database Button The levelized cost of energy (LCOE) calculator provides a simple calculator for both utility-scale and distributed generation (DG) renewable energy technologies that compares the combination of capital costs, operations and maintenance (O&M), performance, and fuel costs. Note that this does not include financing issues, discount issues, future replacement, or degradation costs. Each of these would need to be included for a thorough analysis. To estimate simple cost of energy, use the slider controls or enter values directly to adjust the values. The calculator will return the LCOE expressed in cents per kilowatt-hour (kWh). The U.S. Department of Energy (DOE) Federal Energy Management Program

438

Performance of Installed Cooking Exhaust Devices  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Performance of Installed Cooking Exhaust Devices Performance of Installed Cooking Exhaust Devices Title Performance of Installed Cooking Exhaust Devices Publication Type Journal Article Refereed Designation Refereed LBNL Report Number LBNL-5265E Year of Publication 2012 Authors Singer, Brett C., William W. Delp, Michael G. Apte, and Phillip N. Price Journal Indoor Air Volume 22 Issue 3 Pagination 224-234 Date Published 06/2012 Keywords carbon monoxide, natural gas burners, nitrogen dioxide, range hood, task ventilation, unvented combustion, indoor environment group, Range Hood Test Facility Abstract The performance metrics of airflow, sound, and combustion product capture efficiency (CE) were measured for a convenience sample of fifteen cooking exhaust devices, as installed in residences. Results were analyzed to quantify the impact of various device- and installation-dependent parameters on CE. Measured maximum airflows were 70% or lower than values noted on product literature for 10 of the devices. Above-the-cooktop devices with flat bottom surfaces (no capture hood) - including exhaust fan/microwave combination appliances - were found to have much lower CE at similar flow rates, compared to devices with capture hoods. For almost all exhaust devices and especially for rear-mounted downdraft exhaust and microwaves, CE was substantially higher for back compared with front burner use. Flow rate, and the extent to which the exhaust device extends over the burners that are in use, also had a large effect on CE. A flow rate of 95 liters per second (200 cubic feet per minute) was necessary, but not sufficient, to attain capture efficiency in excess of 75% for the front burners. A-weighted sound levels in kitchens exceeded 57 dB when operating at the highest fan setting for all 14 devices evaluated for sound performance.

439

Cost of Adding E85 Fueling Capability to Existing Gasoline Stations: NREL Survey and Literature Search (Fact Sheet)  

SciTech Connect (OSTI)

Fact sheet provides framework for gas station owners to access what a reasonable cost would be to install E85 infrastructure.

Not Available

2008-03-01T23:59:59.000Z

440

Oxygenation cost estimates for Cherokee, Douglas, and Norris reservoirs  

SciTech Connect (OSTI)

The capital and annual costs associated with reoxygenation of the turbine releases at Cherokee, Douglas and Norris Reservoirs using the small bubble injection technique developed for Ft. Patrick Henry Dam were computed. The weekly average dissolved oxygen (DO) deficits were computed for each reservoir for an average year (based on 16 years of records). The total annual cost of an oxygen supply and injection system for each reservoir is presented. 5 refs., 6 figs., 5 tabs.

Fain, T.G.

1980-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "installed capital cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Akeida Capital Management | Open Energy Information  

Open Energy Info (EERE)

Akeida Capital Management Akeida Capital Management Jump to: navigation, search Name Akeida Capital Management Place New York, New York Zip 10036 Region Northeast - NY NJ CT PA Area Product Financing Environmental Projects Number of employees 1-10 Year founded 2007 Phone number 212-702-7184 Website http://www.akeidacapital.com Coordinates 40.7631485°, -73.9962255° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.7631485,"lon":-73.9962255,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

442

RNK Capital LLC | Open Energy Information  

Open Energy Info (EERE)

RNK Capital LLC RNK Capital LLC Jump to: navigation, search Name RNK Capital LLC Place Wilmington, Delaware Zip 19808 Sector Renewable Energy Product RNK intends to invest money in the purchase of CERs to be delivered during the 2008-2012 commitment period under the Kyoto Protocol and the US domestic renewable energy market. Coordinates 42.866922°, -72.868494° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.866922,"lon":-72.868494,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

443

Cross Capital AG | Open Energy Information  

Open Energy Info (EERE)

Cross Capital AG Cross Capital AG Jump to: navigation, search Name Cross Capital AG Place Zug, Switzerland Zip 6300 Sector Solar Product Switzerland-based company that participates in enterprises of all kinds at home and abroad. The company Shares a 50% stake in the Ibersol STEG project with German solar developer Solar Millennium. Coordinates 47.171507°, 8.516215° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.171507,"lon":8.516215,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

444

Survey of LWR environmental control technology performance and cost  

SciTech Connect (OSTI)

This study attempts to establish a ranking for species that are routinely released to the environment for a projected nuclear power growth scenario. Unlike comparisons made to existing standards, which are subject to frequent revision, the ranking of releases can be used to form a more logical basis for identifying the areas where further development of control technology could be required. This report describes projections of releases for several fuel cycle scenarios, identifies areas where alternative control technologies may be implemented, and discusses the available alternative control technologies. The release factors were used in a computer code system called ENFORM, which calculates the annual release of any species from any part of the LWR nuclear fuel cycle given a projection of installed nuclear generation capacity. This survey of fuel cycle releases was performed for three reprocessing scenarios (stowaway, reprocessing without recycle of Pu and reprocessing with full recycle of U and Pu) for a 100-year period beginning in 1977. The radioactivity releases were ranked on the basis of a relative ranking factor. The relative ranking factor is based on the 100-year summation of the 50-year population dose commitment from an annual release of radioactive effluents. The nonradioactive releases were ranked on the basis of dilution factor. The twenty highest ranking radioactive releases were identified and each of these was analyzed in terms of the basis for calculating the release and a description of the currently employed control method. Alternative control technology is then discussed, along with the available capital and operating cost figures for alternative control methods.

Heeb, C.M.; Aaberg, R.L.; Cole, B.M.; Engel, R.L.; Kennedy, W.E. Jr.; Lewallen, M.A.

1980-03-01T23:59:59.000Z

445

Estimated Cost Description Determination Date:  

Broader source: Energy.gov (indexed) [DOE]

Title, Location Title, Location Estimated Cost Description Determination Date: 2010 LCLS Undulator 2 is envisioned to be a 0.2 - 2keV FEL x-ray source, capable of delivering x-rays to End Station A (ESA), located in the existing Research Yard at SLAC. It will also be configurable as a non- FEL hard x-ray source capable of delivering a chirped x-ray pulse for single-shot broad-spectrum measurements. The project would entail reconstruction of the electron beam transport to End Station A, construction and installation of a new undulator in the tunnel upstream of ESA and beam dump, and construction and installation of x-ray transport, optics, and diagnostics in ESA. It also includes the construction of an annex to End Station A , providing hutches for experiment stations.

446

High Performance Home Cost Performance Trade-Offs: Production Builders- Building America Top Innovation  

Broader source: Energy.gov [DOE]

This Building America Innovations profile describes Building America research showing how some energy-efficiency measure cost increases can balance again measures that reduce up-front costs: Advanced framing cuts lumber costs, right sizing can mean downsizing the HVAC, moving HVAC into conditioned space cuts installation costs, designing on a 2-foot grid reduces materials waste, etc.

447

Energy Technology Cost and Performance Data | OpenEI  

Open Energy Info (EERE)

Technology Cost and Performance Data Technology Cost and Performance Data Dataset Summary Description This data indicates the range of recent cost estimates for renewable energy and other technologies. The estimates are shown in dollars per installed kilowatts of generating capacity. This data provides a compilation of available national-level cost data from a variety of sources. Costs in your specific location will vary. All costs are in 2006 dollars per installed kilowatts in the United States. Source NREL Date Released August 06th, 2009 (5 years ago) Date Updated August 06th, 2009 (5 years ago) Keywords analysis Department of Energy DOE National Renewable Energy Laboratory Data application/vnd.ms-excel icon Energy Technology Cost and Performance Data (xls, 107.5 KiB) text/csv icon Capacity Factor (csv, 1.8 KiB)

448

Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility  

SciTech Connect (OSTI)

Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project cost match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.

Jack Q. Richardson

2012-06-28T23:59:59.000Z

449

Small Wind Guidebook/Where Can I Find Installation and Maintenance Support  

Open Energy Info (EERE)

Where Can I Find Installation and Maintenance Support Where Can I Find Installation and Maintenance Support < Small Wind Guidebook Jump to: navigation, search Print PDF WIND ENERGY STAKEHOLDER ENGAGEMENT & OUTREACHSmall Wind Guidebook Home WindTurbine-icon.png Small Wind Guidebook * Introduction * First, How Can I Make My Home More Energy Efficient? * Is Wind Energy Practical for Me? * What Size Wind Turbine Do I Need? * What Are the Basic Parts of a Small Wind Electric System? * What Do Wind Systems Cost? * Where Can I Find Installation and Maintenance Support? * How Much Energy Will My System Generate? * Is There Enough Wind on My Site? * How Do I Choose the Best Site for My Wind Turbine? * Can I Connect My System to the Utility Grid? * Can I Go Off-Grid? * State Information Portal * Glossary of Terms * For More Information

450

Encirclement sleeves reduce pipeline repair costs  

SciTech Connect (OSTI)

Welded sleeve, or replacement of line repair methods have been used successfully for many years in the pipeline industry but can lead to other difficulties for a pipeline operator. Clock Spring`s composite sleeves have been used in over ten thousand pipeline repairs with pipe sizes ranging from 6- to 56-inches in diameter, all without costly shutdown, welding or purging. Repairs can be completed while the pipeline is fully operational and require only six inches of clearance under the pipe for wrapping the eight thicknesses of the coil. This minimizes costly digging and backfilling over long runs of pipe and necessary shoring for personnel safety. Also it provides a more cost-effective alterative to conventional pipeline repair since special handling, lifting, or installation equipment is not needed. This paper reviews the installation and performance of these sleeves.

NONE

1996-01-01T23:59:59.000Z

451

Example G Cost of construction of nuclear power plants Description of data  

E-Print Network [OSTI]

Example G Cost of construction of nuclear power plants Description of data Table G.1 gives data) power plants constructed in USA. It is required to predict the capital cost involved in the construction of further LWR power plants. The notation used in Table G.1 is explained in Table G.2. The final 6 lines

Reid, Nancy

452

Example G Cost of construction of nuclear power plants Description of data  

E-Print Network [OSTI]

1 Example G Cost of construction of nuclear power plants Description of data Table G.1 gives reactor (LWR) power plants constructed in USA. It is required to predict the capital cost involved in the construction of further LWR power plants. The notation used in Table G.1 is explained in Table G.2. The final 6

Reid, Nancy

453

Balancing Cost and Risk: The Treatment of Renewable Energy in Western Utility Resource Plans  

E-Print Network [OSTI]

Energy Credits (RECs)38 5.2 Geothermal Costgeothermal, wave energy, solar, landfill gas, and MSW, but excluded each of these resources due to some combination of high capital costs,geothermal bids that have been submitted in recent renewable energy solicitations. If geothermal projects really are this cost-

Bolinger, Mark; Wiser, Ryan

2005-01-01T23:59:59.000Z

454

Estimating Specialty Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Specialty costs are those nonstandard, unusual costs that are not typically estimated. Costs for research and development (R&D) projects involving new technologies, costs associated with future regulations, and specialty equipment costs are examples of specialty costs. This chapter discusses those factors that are significant contributors to project specialty costs and methods of estimating costs for specialty projects.

1997-03-28T23:59:59.000Z

455

Direct costing  

E-Print Network [OSTI]

oau 5e reduced. Under the same oonOitions, even ~Me on a bread scale entails not mere1y the conduct of the direct oyeraticns cf yrccessing the materials into finished products, but also the performance of auxiliary functions. these may 'ba power y... purposes have been advanced as folkway le Most of a o03RyaxO' 8 products Grc usual13r sold at prices which oovex' full product costs y plus 861ling a%el administrative expenses, plus normal profit. The inventoi~ valuate. on should be consistent...

Browning, Donald Bullock

2012-06-07T23:59:59.000Z

456

Job Maintenance and Capital Development Fund (North Carolina) | Department  

Broader source: Energy.gov (indexed) [DOE]

Maintenance and Capital Development Fund (North Carolina) Maintenance and Capital Development Fund (North Carolina) Job Maintenance and Capital Development Fund (North Carolina) < Back Eligibility Commercial Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State North Carolina Program Type Grant Program Provider Department of Commerce The Job Maintenance and Capital Development Fund provides annual grants to businesses which are located in Development Tier I counties. The Fund is intended to encourage the retention of significant numbers of high-paying, high-quality job and large-scale capital investments. Grants may be made for a term of up to ten years. The business must have at least 2000 employees and invest $200 million in capital improvements

457

Quick Estimate of IRR From Capital Estimate Ratios  

E-Print Network [OSTI]

Energy Technology Conference, Houston, TX, May 12-15, 1985 Table II Net Present Value of a unit of Capital ($1000) Time year 0 1 2 3 4 5 6 Capital $ -1000 0 0 0 0 0 0 Capital Assoc. $ 0 52 55 58 62 66 70 Expense (a. t.) Tax Effect of $ 0 72 106 101... Energy Technology Conference, Houston, TX, May 12-15, 1985 Table II Net Present Value of a unit of Capital ($1000) Time year 0 1 2 3 4 5 6 Capital $ -1000 0 0 0 0 0 0 Capital Assoc. $ 0 52 55 58 62 66 70 Expense (a. t.) Tax Effect of $ 0 72 106 101...

Larson, R. J.

458

Cost Analysis Rate Settin  

E-Print Network [OSTI]

Cost Analysis and Rate Settin for Animal Research Facilities #12;#12;Cost Analysis and Rate ... .. . ...................... . . . ................................. . .... 7 Chapter 2 Preparation for Cost Analysis ......................................................... 9 Chapter 3 Assignment of Costs to Animal Research Facility Cost Centers

Baker, Chris I.

459

Evaluation of the Total Cost of Ownership of Fuel Cell-Powered Material Handling Equipment  

SciTech Connect (OSTI)

This report discusses an analysis of the total cost of ownership of fuel cell-powered and traditional battery-powered material handling equipment (MHE, or more typically 'forklifts'). A number of fuel cell MHE deployments have received funding support from the federal government. Using data from these government co-funded deployments, DOE's National Renewable Energy Laboratory (NREL) has been evaluating the performance of fuel cells in material handling applications. NREL has assessed the total cost of ownership of fuel cell MHE and compared it to the cost of ownership of traditional battery-powered MHE. As part of its cost of ownership assessment, NREL looked at a range of costs associated with MHE operation, including the capital costs of battery and fuel cell systems, the cost of supporting infrastructure, maintenance costs, warehouse space costs, and labor costs. Considering all these costs, NREL found that fuel cell MHE can have a lower overall cost of ownership than comparable battery-powered MHE.

Ramsden, T.

2013-04-01T23:59:59.000Z

460

Alternative Fuels Data Center: Installing New E85 Equipment  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Installing New E85 Installing New E85 Equipment to someone by E-mail Share Alternative Fuels Data Center: Installing New E85 Equipment on Facebook Tweet about Alternative Fuels Data Center: Installing New E85 Equipment on Twitter Bookmark Alternative Fuels Data Center: Installing New E85 Equipment on Google Bookmark Alternative Fuels Data Center: Installing New E85 Equipment on Delicious Rank Alternative Fuels Data Center: Installing New E85 Equipment on Digg Find More places to share Alternative Fuels Data Center: Installing New E85 Equipment on AddThis.com... More in this section... Ethanol Basics Benefits & Considerations Stations Locations Infrastructure Development Business Case Equipment Options Equipment Installation Codes, Standards, & Safety Vehicles Laws & Incentives

Note: This page contains sample records for the topic "installed capital cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

First installation of an electrical submersible pump in a subsea well  

SciTech Connect (OSTI)

As offshore oil fields are being developed towards deeper and deeper waters, new technologies are required to curb capital expenditures. In Brazil, where oil consumption is increasing and huge oil fields lie in high water depths, the issue is particularly pressing. Earlier and higher oil production from those oil fields could be attained by the use of Electrical Submersible Pumps (ESP), so far restricted to dry completions. Also longer distances from well to platform would be made practical. For the initial phase of this development, Petrobras worked together with Tronic, Reda, Pirelli, Lasalle, Sade-Vigesa and Cooper. As a result, first-in-the-world ESP installation in a subsea well has been successfully achieved on October/1994 in RJS-221, located at Carapeba Field, Campos Basin, Brazil.

Mendonca, J.E.; Hodge, R.C.; Izetti, R. [Petrobras, Rio de Janeiro (Brazil); Nicholson, A.; Dwiggins, J.L.; Morrison, D.; Cia, M.; Alfano, P.P.

1995-12-31T23:59:59.000Z

462

Reclamation cost inputs for the resource allocation and mine costing model. Final working paper  

SciTech Connect (OSTI)

The purpose of this study is to improve estimates of surface mining reclamation cost components used as inputs to the Energy Information Administration's Resource Allocation and Mine Costing (RAMC) model. Costs ignored by the RAMC equations and input separately into the model on a regional basis were the focus of this study. Estimates of costs associated with the following reclamation activities were developed: valley fill construction, topsoil handling, runoff and diversion ditch construction and backfilling, sediment pond construction and backfilling, final pit backfilling and highwall reduction, revegetation, and permitting. For each activity, separate estimates were developed by cost component (initial capital, deferred capital, and annual operating), region (central Appalachia, northern Appalachia, the Midwest, and the West), and overburden ratio. For the first five activities, a ''composite mine'' approach was used. Basic engineering data on the quantity of material moved, and the distance over which it is moved, were obtained on a task-by-task basis for regional samples of actual mining operations. Mine permit applications filed with state and federal regulatory agencies were used as the source of these data. On the basis of the collected data, average material quantities and transportation distances were calculated for each region and reclamation task; these averages were used as the composite mine specifications assumed to be representative of the typical earthmoving requirements associated with each task in each region. Revegetation costs were estimated on the basis of published or publicly available data representing either the actual or estimated costs to state governments of revegetating abandoned mine sites. Permitting costs were developed on the basis of estimates of typical regional permitting costs solicited from engineering contractors providing permitting services to the coal industry. 11 tabs.

Not Available

1984-11-30T23:59:59.000Z

463

205 kW Photovoltaic (PV) System Installed on the U.S. Department of Energy's Forrestal Building  

Broader source: Energy.gov (indexed) [DOE]

Project Description Project Description The Energy Policy Act of 2005 (EPAct 2005), the Energy Independence and Security Act of 2007 (EISA 2007), and Presidential Executive Order 13423 all contain requirements for Federal facilities to decrease energy consumption and increase the use of renewable energy by the year 2015. To provide leadership in meeting these requirements, DOE, in partnership with the General Services Administration (GSA), has installed a rooftop solar electric, or PV, system on the roof of DOE's headquarters in Washington, D.C. The 205 kilowatt (kW) installation is one of the largest of its kind in the Nation's capital. A display in the For- restal building will show the power output of the PV system during the day and the energy produced over

464

SunShot Initiative: Reducing Non-Hardware Costs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Reducing Non-Hardware Costs Reducing Non-Hardware Costs DOE supports efforts to dramatically reduce the non-hardware, balance of systems costs associated with solar energy systems. Representing as much as 64% of the total installed system price, these "soft costs" include: Customer Acquisition Financing and Contracting Permitting, Interconnection, and Inspection Installation and Performance Operations and Maintenance. To meet SunShot goals, the industry must innovate new ways to automate and speed processes that make it easier for consumers, businesses, utilities, solar companies, and others to install solar projects. For example, novel software solutions now allow solar companies to design systems and provide accurate quotes using satellite images rather than conducting full site visits.

465

NREL: News - NREL Reports Soft Costs Now Largest Piece of Solar  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

News Release NR-6313 News Release NR-6313 NREL Reports Soft Costs Now Largest Piece of Solar Installation Total Cost December 2, 2013 Two detailed reports from the Energy Department's National Renewable Energy Laboratory (NREL) find that solar financing and other non-hardware costs - often referred to as "soft costs" - now comprise up to 64% of the total price of residential solar energy systems, reflecting how soft costs are becoming an increasingly larger fraction of the cost of installing solar. "The two new reports, along with previous reports, provide a comprehensive look at the full cost of installing solar, while delineating and quantifying the various contributors to that final cost," NREL analyst Barry Friedman said. The first new report, "Benchmarking Non-Hardware Balance-of-System (Soft)

466

Summer Projects 2013 Major Capital Projects  

E-Print Network [OSTI]

FANNIN AND MAIN · NEW CONTINENTAL CROSSWALK STRIPING · NEW STREET TREES, PEDESTRIAN LIGHTS and Installation #12;Summer Projects City of Houston Projects #12;Main Street Intersections #12;Main Street AND FURNISHINGS · REDUCE CLUTTER AT CORNERS, RELOCATE UTILITIES WHEN POSSIBLE #12;Main Street Intersections #12

Alvarez, Pedro J.

467

Solar Schools Assessment and Implementation Project: Financing Options for Solar Installations on K-12 Schools  

SciTech Connect (OSTI)

This report focuses on financial options developed specifically for renewable energy and energy efficiency projects in three California public school districts. Solar energy systems installed on public schools have a number of benefits that include utility bill savings, reductions in greenhouse gas emissions (GHGs) and other toxic air contaminants, job creation, demonstrating environmental leadership, and creating learning opportunities for students. In the 2011 economic environment, the ability to generate general-fund savings as a result of reducing utility bills has become a primary motivator for school districts trying to cut costs. To achieve meaningful savings, the size of the photovoltaic (PV) systems installed (both individually on any one school and collectively across a district) becomes much more important; larger systems are required to have a material impact on savings. Larger PV systems require a significant financial commitment and financing therefore becomes a critical element in the transaction. In simple terms, school districts can use two primary types of ownership models to obtain solar installations and cost savings across a school district. The PV installations can be financed and owned directly by the districts themselves. Alternatively, there are financing structures whereby another entity, such as a solar developer or its investors, actually own and operate the PV systems on behalf of the school district. This is commonly referred to as the 'third-party ownership model.' Both methods have advantages and disadvantages that should be weighed carefully.

Coughlin, J.; Kandt, A.

2011-10-01T23:59:59.000Z

468

Energy Saving 'Cool Roofs' Installed at Y-12 | Y-12 National Security  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Saving 'Cool ... Saving 'Cool ... Energy Saving 'Cool Roofs' Installed at Y-12 Posted: October 17, 2012 - 4:08pm The Y-12 National Security Complex has taken additional steps to reduce its energy costs by installing almost 100,000 square feet of new heat reflective "cool" roofs at the Oak Ridge, Tennessee facility. The latest Y-12 cool roofs were added to Buildings 9204-2E and 9103. Fifteen percent of roofs at Y-12 are currently equipped with cool roof technology. This technology is expected to be applied to the majority of the roofs at Y-12. "Replacing older, heat-absorbing roofs with the heat-reflective cool roofs is part of NNSA's strategy to achieve energy and cost efficiencies," said Robert "Dino" Herrera, Facilities and Infrastructure Recapitalization Program Manager. "We strive to lead the

469

Cost Sharing What is Cost Sharing?  

E-Print Network [OSTI]

1 Cost Sharing What is Cost Sharing? x Cost sharing is a commitment to use university resources and Expenses o Equipment x Committing to cost share is highly discouraged unless required by the sponsoring agency x Tracking of committed cost share is required to meet federal regulations (OMB A-110) x UCSD has

Tsien, Roger Y.

470

Nonproliferation Human Capital Development in Malaysia | National Nuclear  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Human Capital Development in Malaysia | National Nuclear Human Capital Development in Malaysia | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Nonproliferation Human Capital Development in Malaysia Nonproliferation Human Capital Development in Malaysia Posted By NNSA Public Affairs NNSA Blog Photo Credit: National University of Malaysia

471

Social capital and business performance: ethnic enterprises in Canada  

Science Journals Connector (OSTI)

The objective of this research was to identify links between social capital and the performance of ethnic businesses. Descriptive analyses, correlation tests and discriminant analyses were conducted on social capital variables compared to an ethnic business performance index, using a sample of 573 entrepreneurs from Chinese, Italian, Indian and Jewish backgrounds. The results point to the existence of a link between business performance and social capital. Analysis was able to predict membership of higher and lower performing businesses from a selection of social capital variables. As an exploratory study, this brings unique results to the ethnic entrepreneurship literature.

Charles Perreault; Gabrielle A. Brenner; Teresa V. Menzies; Louis Jacques Filion; Charles Ramangalahy

2007-01-01T23:59:59.000Z

472

MissionPoint Capital Partners | Open Energy Information  

Open Energy Info (EERE)

Norwalk, Connecticut Zip: CT 06854 Product: Private Investment company capitalizing on clean energy technology and increasing capacity. Coordinates: 43.83033, -90.622007...

473

Agri capital GmbH | Open Energy Information  

Open Energy Info (EERE)

Zip: 48155 Product: Muenster-based agri.capital develops and operates decentralised biogas plants. Coordinates: 33.652, -97.376364 Show Map Loading map......

474

Ricmore Capital PLC Formerly Energy Asset Management Plc | Open...  

Open Energy Info (EERE)

Energy Asset Management Plc) Place: United Kingdom Sector: Services Product: Provides Meter Asset Management and energy management services. References: Ricmore Capital PLC...

475

Investment opportunities and market reaction to capital expenditure decisions  

Science Journals Connector (OSTI)

In this study, we argue that share price reaction to a firm's capital expenditure decisions depends critically on the market's assessment of the quality of its investment opportunities. We postulate that announcements of increases (decreases) in capital expenditures positively (negatively) affect the stock prices of firms with valuable investment opportunities. Contrarily, we predict that announcements of increases (decreases) in capital spending negatively (positively) affect the share prices of firms without such opportunities. Our empirical results are generally consistent with these predictions. Overall, empirical evidence supports our conjecture that it is the quality of the firm's investment opportunities rather than its industry affiliation which determines the share price reaction to its capital expenditure decisions.

Kee H. Chung; Peter Wright; Charlie Charoenwong

1998-01-01T23:59:59.000Z

476

Program and Project Management for the Acquisition of Capital Assets  

Broader source: Energy.gov [DOE]

This Order provides project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and capable of meeting mission performance and environmental...

477

Carbon Credit Capital and Feedback Ventures JV | Open Energy...  

Open Energy Info (EERE)

and Feedback Ventures JV Jump to: navigation, search Name: Carbon Credit Capital and Feedback Ventures JV Place: India Sector: Carbon Product: String representation "Carbon Credit...

478

Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States  

Broader source: Energy.gov [DOE]

For the United States to ensure that the substantial rollout of offshore wind energy projects envisioned by the DOE is carried out in an efficient and cost-effective manner, it is important to observe the current and emerging practices in the international offshore wind energy industry. In this manner, the United States can draw from the experience already gained around the world, combined with experience from the sizeable U.S. land-based wind industry, to develop a strong offshore wind sector. The work detailed in this report will support that learning curve by enabling optimization of the cost-effectiveness of installation, operation, and maintenance activities for offshore wind farms.

479

Cora Capital Advisors | Open Energy Information  

Open Energy Info (EERE)

Advisors Advisors Jump to: navigation, search Logo: Cora Capital Advisors Name Cora Capital Advisors Address 445 Park Avenue, 9th Floor Place New York Zip 10022 Region Northeast - NY NJ CT PA Area Product Investment Banking for the Alternative Energy and Clean Technology Sectors Number of employees 1-10 Year founded 2009 Phone number 212-537-5176 Website http://www.coracapadvisors.com Coordinates 40.761092°, -73.970642° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.761092,"lon":-73.970642,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

480

Capital Equity Partners LLC | Open Energy Information  

Open Energy Info (EERE)

Partners LLC Partners LLC Jump to: navigation, search Name Capital Equity Partners LLC Address 410 Park Avenue Place New York, New York Zip 10022 Region Northeast - NY NJ CT PA Area Product Structures transactions and raises capital for companies pursuing business opportunities in developing and industrialized nations worldwide Year founded 1995 Website http://www.capitalequitypartne Coordinates 40.76048°, -73.972256° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.76048,"lon":-73.972256,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "installed capital cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Marathon Capital LLC (California) | Open Energy Information  

Open Energy Info (EERE)

California) California) Jump to: navigation, search Logo: Marathon Capital LLC (California) Name Marathon Capital LLC (California) Address 42 Miller Avenue Place Mill Valley, California Zip 94941 Region Bay Area Product Investment Banking firm specializing in providing comprehensive financial services to clients in the Global Energy, Infrastructure and Project Finance markets Phone number (415) 839-0066 Website http://marathon-cap.com/ Coordinates 37.904674°, -122.547763° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.904674,"lon":-122.547763,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

482

Cost Sharing Basics Definitions  

E-Print Network [OSTI]

Cost Sharing Basics Definitions Some funding agencies require the grantee institution the project costs. Cost sharing is defined as project costs not borne by the sponsor. Cost sharing funds may resources or facilities. If the award is federal, only acceptable non-federal costs qualify as cost sharing

Finley Jr., Russell L.

483

Costs Associated With Compressed Natural Gas Vehicle Fueling Infrastructure  

SciTech Connect (OSTI)

This document is designed to help fleets understand the cost factors associated with fueling infrastructure for compressed natural gas (CNG) vehicles. It provides estimated cost ranges for various sizes and types of CNG fueling stations and an overview of factors that contribute to the total cost of an installed station. The information presented is based on input from professionals in the natural gas industry who design, sell equipment for, and/or own and operate CNG stations.

Smith, M.; Gonzales, J.

2014-09-01T23:59:59.000Z

484

Migrants Remittances and Investments in Childrens Human Capital: The Role of Asymmetric Preferences in Mexico  

E-Print Network [OSTI]

are spent on capital expenditure and improvements on thean Increase in Human Capital Expenditures In this section, Iany change in human capital expenditures which is positive

Malone, Lauren

2007-01-01T23:59:59.000Z

485

Analysis of Cycling Costs in Western Wind and Solar Integration Study  

SciTech Connect (OSTI)

The Western Wind and Solar Integration Study (WWSIS) examined the impact of up to 30% penetration of variable renewable generation on the Western Electricity Coordinating Council system. Although start-up costs and higher operating costs because of part-load operation of thermal generators were included in the analysis, further investigation of additional costs associated with thermal unit cycling was deemed worthwhile. These additional cycling costs can be attributed to increases in capital as well as operations and maintenance costs because of wear and tear associated with increased unit cycling. This analysis examines the additional cycling costs of the thermal fleet by leveraging the results of WWSIS Phase 1 study.

Jordan, G.; Venkataraman, S.

2012-06-01T23:59:59.000Z

486

Choosing and Installing Geothermal Heat Pumps | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Choosing and Installing Geothermal Heat Pumps Choosing and Installing Geothermal Heat Pumps Choosing and Installing Geothermal Heat Pumps June 24, 2012 - 3:55pm Addthis These geothermal heating and cooling units installed in the basement of a new home are tied to a complex array of underground coils to keep indoor temperatures comfortable. | Photo courtesy of ©iStockphoto/BanksPhotos These geothermal heating and cooling units installed in the basement of a new home are tied to a complex array of underground coils to keep indoor temperatures comfortable. | Photo courtesy of ©iStockphoto/BanksPhotos What does this mean for me? Installing a geothermal heat pump is not a do-it-yourself job. When you hire a contractor to install your geothermal heat pump, ask for and check references of installations that are several years old.

487

Choosing and Installing Geothermal Heat Pumps | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Choosing and Installing Geothermal Heat Pumps Choosing and Installing Geothermal Heat Pumps Choosing and Installing Geothermal Heat Pumps June 24, 2012 - 3:55pm Addthis These geothermal heating and cooling units installed in the basement of a new home are tied to a complex array of underground coils to keep indoor temperatures comfortable. | Photo courtesy of ©iStockphoto/BanksPhotos These geothermal heating and cooling units installed in the basement of a new home are tied to a complex array of underground coils to keep indoor temperatures comfortable. | Photo courtesy of ©iStockphoto/BanksPhotos What does this mean for me? Installing a geothermal heat pump is not a do-it-yourself job. When you hire a contractor to install your geothermal heat pump, ask for and check references of installations that are several years old.

488

Energy Department Launches SunShot Prize Competition to Install...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SunShot Prize Competition to Install Solar Energy Systems at a Fraction of Today's Price Energy Department Launches SunShot Prize Competition to Install Solar Energy Systems at a...

489

Helping Ensure High-Quality Installation of Solar Power Technologies...  

Energy Savers [EERE]

Ensure High-Quality Installation of Solar Power Technologies Helping Ensure High-Quality Installation of Solar Power Technologies April 15, 2013 - 12:00am Addthis The Midwest...

490

Energy Saving "Cool Roofs" Installed at Y-12 | National Nuclear...  

National Nuclear Security Administration (NNSA)

Home Field Offices Welcome to the NNSA Production Office NPO News Releases Energy Saving "Cool Roofs" Installed at Y-12 Energy Saving "Cool Roofs" Installed at Y-12 The...

491

Energy Saving 'Cool Roofs' Installed at Y-12 | National Nuclear...  

National Nuclear Security Administration (NNSA)

Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at NNSA Blog Home NNSA Blog Energy Saving 'Cool Roofs' Installed at Y-12 Energy Saving 'Cool Roofs' Installed at Y-12...

492

FULL-COST ACCOUNTING  

Science Journals Connector (OSTI)

FULL-COST ACCOUNTING ... Environmental costs would be built into a product's cost, and consumers would be able to make informed purchases. ...

1993-01-11T23:59:59.000Z

493

Performance of Installed Cooking Exhaust Devices  

SciTech Connect (OSTI)

The performance metrics of airflow, sound, and combustion product capture efficiency (CE) were measured for a convenience sample of fifteen cooking exhaust devices, as installed in residences. Results were analyzed to quantify the impact of various device- and installation-dependent parameters on CE. Measured maximum airflows were 70% or lower than values noted on product literature for 10 of the devices. Above-the-cooktop devices with flat bottom surfaces (no capture hood) including exhaust fan/microwave combination appliances were found to have much lower CE at similar flow rates, compared to devices with capture hoods. For almost all exhaust devices and especially for rear-mounted downdraft exhaust and microwaves, CE was substantially higher for back compared with front burner use. Flow rate, and the extent to which the exhaust device extends over the burners that are in use, also had a large effect on CE. A flow rate of 95 liters per second (200 cubic feet per minute) was necessary, but not sufficient, to attain capture efficiency in excess of 75% for the front burners. A-weighted sound levels in kitchens exceeded 57 dB when operating at the highest fan setting for all 14 devices evaluated for sound performance.

Singer, Brett C.; Delp, William W.; Apte, Michael G.; Price, Philip N.

2011-11-01T23:59:59.000Z

494

Safeguards-by-Design: Guidance for Independent Spent Fuel Dry Storage Installations (ISFSI)  

SciTech Connect (OSTI)

This document summarizes the requirements and best practices for implementing international nuclear safeguards at independent spent fuel storage installations (ISFSIs), also known as Away-from- Reactor (AFR) storage facilities. These installations may provide wet or dry storage of spent fuel, although the safeguards guidance herein focuses on dry storage facilities. In principle, the safeguards guidance applies to both wet and dry storage. The reason for focusing on dry independent spent fuel storage installations is that this is one of the fastest growing nuclear installations worldwide. Independent spent fuel storage installations are typically outside of the safeguards nuclear material balance area (MBA) of the reactor. They may be located on the reactor site, but are generally considered by the International Atomic Energy Agency (IAEA) and the State Regulator/SSAC to be a separate facility. The need for this guidance is becoming increasingly urgent as more and more nuclear power plants move their spent fuel from resident spent fuel ponds to independent spent fuel storage installations. The safeguards requirements and best practices described herein are also relevant to the design and construction of regional independent spent fuel storage installations that nuclear power plant operators are starting to consider in the absence of a national long-term geological spent fuel repository. The following document has been prepared in support of two of the three foundational pillars for implementing Safeguards-by-Design (SBD). These are: i) defining the relevant safeguards requirements, and ii) defining the best practices for meeting the requirements. This document was prepared with the design of the latest independent dry spent fuel storage installations in mind and was prepared specifically as an aid for designers of commercial nuclear facilities to help them understand the relevant international requirements that follow from a countrys safeguards agreement with the IAEA. If these requirements are understood at the earliest stages of facility design, it will help eliminate the costly retrofit of facilities that has occurred in the past to accommodate nuclear safeguards, and will help the IAEA implement nuclear safeguards worldwide, especially in countries building their first nuclear facilities. It is also hoped that this guidance document will promote discussion between the IAEA, State Regulator/SSAC, Project Design Team, and Facility Owner/Operator at an early stage to ensure that new ISFSIs will be effectively and efficiently safeguarded. This is intended to be a living document, since the international nuclear safeguards requirements may be subject to revision over time. More importantly, the practices by which the requirements are met are continuously modernized by the IAEA and facility operators for greater efficiency and cost effectiveness. As these improvements are made, it is recommended that the subject guidance document be updated and revised accordingly.

Trond Bjornard; Philip C. Durst

2012-05-01T23:59:59.000Z

495

SIID Tangible CONTROLLED OBJECT CODES: CAPITALIZED OBJECT CODES  

E-Print Network [OSTI]

vehicle 1811 - Motor Vehicle Other 1812 - Aircraft 1813 - Motor Vehicle (Natural Gas conversion -Passengers Cars 1814 - Motor Vehicles - Natural Gas Conversion-other 1820 - Boats 1841- Software > 100kSIID Tangible CONTROLLED OBJECT CODES: CAPITALIZED OBJECT CODES: Capital Objects Codes That Do

Hofmann, Hans A.

496

RMP Standard PreInstalled Software Page 1 of 2  

E-Print Network [OSTI]

RMP Standard PreInstalled Software Page 1 of 2 Standard Software PreInstalled with RMP Windows@lmu.edu or 310-338-7777 RMP Standard PreInstalled Software Page 2 of 2 · Photo Booth EndNote Apple DVD Player

Dahlquist, Kam D.

497

Cost Effectiveness of Electricity Energy Efficiency Programs | Open Energy  

Open Energy Info (EERE)

Cost Effectiveness of Electricity Energy Efficiency Programs Cost Effectiveness of Electricity Energy Efficiency Programs Jump to: navigation, search Tool Summary Name: Cost Effectiveness of Electricity Energy Efficiency Programs Agency/Company /Organization: Resources for the Future Sector: Energy Focus Area: Energy Efficiency Topics: Finance Resource Type: Publications Website: www.rff.org/RFF/Documents/RFF-DP-09-48.pdf Cost Effectiveness of Electricity Energy Efficiency Programs Screenshot References: Cost Effectiveness of Electricity Energy Efficiency Programs[1] Abstract "We analyze the cost-effectiveness of electric utility rate payer-funded programs to promote demand-side management (DSM) and energy efficiency investments. We develop a conceptual model that relates demand growth rates to accumulated average DSM capital per customer and changes in energy

498

CORPORATE DISCLOSURE OF ENVIRONMENTAL CAPITAL EXPENDITURES: A TEST OF ALTERNATIVE THEORIES  

E-Print Network [OSTI]

CORPORATE DISCLOSURE OF ENVIRONMENTAL CAPITAL EXPENDITURES: A TEST OF ALTERNATIVE THEORIES Charles capital expenditure; environmental disclosure; environmental regulation; legitimacy theory; materiality DISCLOSURE OF ENVIRONMENTAL CAPITAL EXPENDITURES: A TEST OF ALTERNATIVE THEORIES Introduction The United

Paris-Sud XI, Université de

499

Virginia Capital Access Program (Virginia) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Capital Access Program (Virginia) Capital Access Program (Virginia) Virginia Capital Access Program (Virginia) < Back Eligibility Commercial Industrial Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Virginia Program Type Loan Program Provider Virginia Economic Development Partnership The Virginia Capital Access Program (CAP), in partnership with Virginia's Small Business Financing Authority, provides access to capital for small businesses. Businesses must apply to participating banks for a traditional loan, and the lender advises the company of enrollment in CAP. The program offers loan guarantees on a portfolio of loans through a loan loss reserve, which it establishes at each participating bank. Funds can be used for

500

South Africa-Capital Markets Climate Initiative | Open Energy Information  

Open Energy Info (EERE)

South Africa-Capital Markets Climate Initiative South Africa-Capital Markets Climate Initiative Jump to: navigation, search Name South Africa-Capital Markets Climate Initiative Agency/Company /Organization World Economic Forum Partner UK Department of Energy and Climate Sector Climate Topics Finance, Low emission development planning, -LEDS Website http://www.decc.gov.uk/en/cont Country South Africa Southern Africa References CMCI[1] World Economic Forum[2] The Capital Markets Climate Initiative (CMCI) is a public-private initiative designed to support the scale up of private finance flows for low carbon technologies, solutions and infrastructure in developing economies by: Developing a common understanding amongst policy makers of why and how public sector action can help mobilise private capital and encourage