National Library of Energy BETA

Sample records for installed base typical

  1. Hawaii Marine Base Installs Solar Roofs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Marine Base Installs Solar Roofs Hawaii Marine Base Installs Solar Roofs April 2, 2010 - 2:42pm Addthis Lorelei Laird Writer, Energy Empowers What does this project do? Marine Corps Base Hawaii replaced roofs on two buildings with polyvinyl chloride membrane 'cool' roofs and solar panels. The new roofs saves $20,000 a year in energy costs. Built on the end of the Mokapu Peninsula on Oahu's northeast coast, the Marine Corps Base Hawaii (MCBH) at Kaneohe Bay gets plenty of sunlight. But harnessing

  2. TYPICAL HOT WATER DRAW PATTERNS BASED ON FIELD DATA

    SciTech Connect (OSTI)

    Lutz, Jim; Melody, Moya

    2012-11-08

    There is significant variation in hot water use and draw patterns among households. This report describes typical hot water use patterns in single-family residences in North America. We found that daily hot water use is highly variable both among residences and within the same residence. We compared the results of our analysis of the field data to the conditions and draw patterns established in the current U.S. Department of Energy (DOE) test procedure for residential water heaters. The results show a higher number of smaller draws at lower flow rates than used in the test procedure. The data from which the draw patterns were developed were obtained from 12 separate field studies. This report describes the ways in which we managed, cleaned, and analyzed the data and the results of our data analysis. After preparing the data, we used the complete data set to analyze inlet and outlet water temperatures. Then we divided the data into three clusters reflecting house configurations that demonstrated small, medium, or large median daily hot water use. We developed the three clusters partly to reflect efforts of the ASHRAE standard project committee (SPC) 118.2 to revise the test procedure for residential water heaters to incorporate a range of draw patterns. ASHRAE SPC 118.2 has identified the need to separately evaluate at least three, and perhaps as many as five, different water heater capacities. We analyzed the daily hot water use data within each cluster in terms of volume and number of hot water draws. The daily draw patterns in each cluster were characterized using distributions for volume of draws, duration of draws, time since previous draw, and flow rates.

  3. Residential Windows and Window Coverings: A Detailed View of the Installed Base and User Behavior

    Broader source: Energy.gov [DOE]

    Includes information about the installed base of residential windows and window coverings, and the operation of window coverings by households.

  4. Hawaii Marine Base Installs Solar Roofs | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Lorelei Laird Writer, Energy Empowers What does this project do? Marine Corps Base Hawaii replaced roofs on two buildings with polyvinyl chloride membrane 'cool' roofs and solar...

  5. Structural Code Considerations for Solar Rooftop Installations.

    SciTech Connect (OSTI)

    Dwyer, Stephen F.; Dwyer, Brian P.; Sanchez, Alfred

    2014-12-01

    Residential rooftop solar panel installations are limited in part by the high cost of structural related code requirements for field installation. Permitting solar installations is difficult because there is a belief among residential permitting authorities that typical residential rooftops may be structurally inadequate to support the additional load associated with a photovoltaic (PV) solar installation. Typical engineering methods utilized to calculate stresses on a roof structure involve simplifying assumptions that render a complex non-linear structure to a basic determinate beam. This method of analysis neglects the composite action of the entire roof structure, yielding a conservative analysis based on a rafter or top chord of a truss. Consequently, the analysis can result in an overly conservative structural analysis. A literature review was conducted to gain a better understanding of the conservative nature of the regulations and codes governing residential construction and the associated structural system calculations.

  6. Installation and Acceptance Stage

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-05-21

    This chapter addresses activities required to install the software, data bases, or data that comprise the software product onto the hardware platform at sites of operation.

  7. Advanced recycling and research complexes: A second strategic use for installations on the base closure list

    SciTech Connect (OSTI)

    Walter, D.W.; Kuusinen, T.L.; Beck, J.E.

    1993-05-01

    Obstacles currently facing the solid waste recycling industry are often related to a lack of public and investor confidence, issues of profitability and liability, and insufficient consumer identification with products made from recycled materials. Resolution of these issues may not be possible without major changes in the way the solid waste recycling business is structured. At the same time, we are faced with opportunities which will not likely recur in our lifetimes: access to educated, well trained work forces; and large tracts of land that are contiguous with metropolitan areas and are developed for heavy industry and transportation. Military installations are being converted to civilian use just in time to serve as important a role in our national resource conservation policy. The future of recycling in North America converges with the future of selected bases on the closure list and takes the form of converting these bases into Advanced Recycling and Research Complexes. The premise is simple: use these strategically-located facilities as industrial parks where a broad range of secondary wastes are separated, refined, or converted and made into new products on site. The wastes would include municipal solid waste (MSW), demolition waste, landscape trimmings, used tires, scrap metal, agricultural waste, food processing waste, and other non-hazardous materials. The park would consist of separation and conversion facilities, research and product standards laboratories, and industries that convert the materials into products and fuels. Energy conversion systems using some waste streams as fuel could be located at the park to supplement energy demands of the industrial operations. The strategic co-location of the resource providers and user industries would minimize transportation costs.

  8. Energy-Performance-Based Design-Build Process: Strategies for Procuring High-Performance Buildings on Typical Construction Budgets: Preprint

    SciTech Connect (OSTI)

    Scheib, J.; Pless, S.; Torcellini, P.

    2014-08-01

    NREL experienced a significant increase in employees and facilities on our 327-acre main campus in Golden, Colorado over the past five years. To support this growth, researchers developed and demonstrated a new building acquisition method that successfully integrates energy efficiency requirements into the design-build requests for proposals and contracts. We piloted this energy performance based design-build process with our first new construction project in 2008. We have since replicated and evolved the process for large office buildings, a smart grid research laboratory, a supercomputer, a parking structure, and a cafeteria. Each project incorporated aggressive efficiency strategies using contractual energy use requirements in the design-build contracts, all on typical construction budgets. We have found that when energy efficiency is a core project requirement as defined at the beginning of a project, innovative design-build teams can integrate the most cost effective and high performance efficiency strategies on typical construction budgets. When the design-build contract includes measurable energy requirements and is set up to incentivize design-build teams to focus on achieving high performance in actual operations, owners can now expect their facilities to perform. As NREL completed the new construction in 2013, we have documented our best practices in training materials and a how-to guide so that other owners and owner's representatives can replicate our successes and learn from our experiences in attaining market viable, world-class energy performance in the built environment.

  9. Hopper Installation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and a host of other scientific endeavors. 00.JPG Delivery 1.JPG Unloading 3.JPG Earthquake protection 4.JPG Installing cabinets 6.JPG Half way there 8.JPG Inspection and...

  10. Measurement-Based Evaluation of Installed Filtration System Performance in Single-Family Homes

    SciTech Connect (OSTI)

    Chan, Wanyu Rengie; Singer, Brett C.

    2014-04-03

    This guide discusses important study design issues to consider when conducting an on-site evaluation of filtration system performance. The two most important dichotomies to consider in developing a study protocol are (1) whether systems are being evaluated in occupied or unoccupied homes and (2) whether different systems are being compared in the same homes or if the comparison is between systems installed in different homes. This document provides perspective and recommendations about a suite of implementation issues including the choice of particle measurement devices, selection of sampling locations, ways to control and/or monitor factors and processes that can impact particle concentrations, and data analysis approaches.

  11. Solar Technologies Installations Ltd | Open Energy Information

    Open Energy Info (EERE)

    Installations Ltd Jump to: navigation, search Name: Solar Technologies Installations Ltd Place: Hampshire, United Kingdom Zip: S051 OHR Sector: Renewable Energy Product: A UK-based...

  12. Energy Use Savings for a Typical New Residential Dwelling Unit Based on the 2009 and 2012 IECC as Compared to the 2006 IECC

    SciTech Connect (OSTI)

    Lucas, Robert G.; Mendon, Vrushali V.; Goel, Supriya

    2012-06-01

    The 2009 and 2012 International Energy Conservation Codes (IECC) require a substantial improvement in energy efficiency compared to the 2006 IECC. This report averages the energy use savings for a typical new residential dwelling unit based on the 2009 and 2012 IECC compared to the 2006 IECC. Results are reported by the eight climate zones in the IECC and for the national average.

  13. Evaluation of the utilities energy monitoring and control system installed at the US Army, Europe, Pirmasens and 97th Base Support Battalion, Germany

    SciTech Connect (OSTI)

    Broders, M.A.; McConnell, B.W.

    1992-01-01

    Authorized under an interagency agreements between the US Department of Energy and the US Army, evaluation of the utilities energy monitoring and control system (UEMCSs) operating at selected US Army installations in Heidelberg, Goeppingen, Pirmasens, and Baumholder, Germany, is nearing completion. This report specifically presents the results of the evaluation of the UEMCS installed at USAREUR, 21st Theater Army Area Command (TAACOM), Pirmasens and 97th Base Support Battalion, which is operated by the Directorate of Engineering and Housing (DEH) Utilities Division. The Oak Ridge National Laboratory (ORNL) was selected by Headquarters, USAREUR, Facilities Engineering Division, Utilities and Energy Branch in Heidelberg to evaluated the overall effectiveness and energy efficiency of UEMCSs at four US Army installations in Germany. The third of these systems to be evaluated, which is the scope of this report, is the UEMCS installed at Pirmasens. This evaluation relies upon existing data and information and does not involve introducing metering and instrumentation for the purpose of measuring installation energy use. The primary purpose of this evaluation is to take an in-depth look at the overall performance and effectiveness of the UEMCS installed at Pirmasens to see if it is achieving its operational objectives by resulting in energy and cost savings.

  14. Sandia Energy - Installation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Installation Home Stationary Power Energy Conversion Efficiency Solar Energy Photovoltaics Solar Market Transformation Installation InstallationTara Camacho-Lopez2015-03-20T19:23:2...

  15. Workplace Charging Installation Costs

    Broader source: Energy.gov [DOE]

    Installation costs and services vary considerably, so employers are encouraged to obtain a number of quotes before moving forward with any installation. An initial site investigation should include:

  16. RESULTS FROM A DEMONSTRATION OF RF-BASED UF6 CYLINDER ACCOUNTING AND TRACKING SYSTEM INSTALLED AT A USEC FACILITY

    SciTech Connect (OSTI)

    Pickett, Chris A; Kovacic, Donald N; Morgan, Jim; Younkin, James R; Carrick, Bernie; Ken, Whittle; Johns, R E

    2008-09-01

    Approved industry-standard cylinders are used globally for storing and transporting uranium hexafluoride (UF{sub 6}) at uranium enrichment plants and processing facilities. To verify that no diversion or undeclared production of nuclear material involving UF{sub 6} cylinders at the facility has occurred, the International Atomic Energy Agency (IAEA) conducts periodic, labor-intensive physical inspections to validate facility records, cylinder identities, and cylinder weights. A reliable cylinder monitoring system that would improve overall inspector effectiveness would be a significant improvement to the current international safeguards inspection regime. Such a system could include real-time unattended monitoring of cylinder movements, situation-specific rules-based event detection algorithms, and the capability to integrate with other types of safeguards technologies. This type of system could provide timely detection of abnormal operational activities that may be used to ensure more appropriate and efficient responses by the IAEA. A system of this type can reduce the reliance on paper records and have the additional benefit of facilitating domestic safeguards at the facilities at which it is installed. A radio-frequency (RF)-based system designed to track uranium hexafluoride (UF{sub 6}) cylinders during processing operations was designed, assembled, and tested at the United States Enrichment Corporation (USEC) facility in Portsmouth, Ohio, to determine the operational feasibility and durability of RF technology. The overall objective of the effort was to validate the robustness of RF technology for potential use as a future international safeguards tool for tracking UF6 cylinders at uranium-processing facilities. The results to date indicate that RF tags represent a feasible technique for tracking UF{sub 6} cylinders in operating facilities. Additional work will be needed to improve the operational robustness of the tags for repeated autoclave processing and to

  17. Workplace Charging Challenge: Install and Manage PEV Charging...

    Office of Environmental Management (EM)

    Charging - Evaluate whether your workplace is right for solar assisted charging stations. ... Charging Equipment and Installation Costs - Review typical price ranges and factors ...

  18. Determination of permissible underground power cable installation -- A calculation method on cable ampacity based on heat generation

    SciTech Connect (OSTI)

    Kuo, C.K.

    1995-09-01

    In a power plant, it is often necessary to install a medium voltage underground cable system to transport the high capacity of auxiliary transformer power output to switchgear lineups. Installation of high current carrying power cable is often limited by the resistive heat generated by the passage of high current. Because heat dissipation in cable routed underground is affected by the soil temperature, soil resistivity, and cable depth, a systematic analysis is necessary to determine the permissible cable ampacity in each cable among the group of cables in any combination of underground cable and duct arrangements. The calculation will determine the medium allowable ampacity in such a system. Depending on the underground cable and duct arrangements, the current carrying capacity of similar cable systems may be different. The impedance of each phase of a cable will be different in a multi-conductor per phase cable system if the cable and duct arrangements are not symmetrical. The calculation will also determine any unbalanced phase impedances and calculate the unbalanced phase currents.

  19. HTAR Configuration and Installation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Configuration and Installation HTAR Configuration and Installation HTAR is an archival utility similar to gnu-tar that allows for the archiving and extraction of local files into and out of HPSS. Configuration Instructions This distribution has default configuration settings which will work for most environments. If you want to use the default values (recommended) you can skip to the section labeled INSTALLATION INSTRUCTIONS. In certain environments, for example if your installation is on a

  20. Solar Installation Labor Market Analysis

    SciTech Connect (OSTI)

    Friedman, B.; Jordan, P.; Carrese, J.

    2011-12-01

    The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

  1. Installation-Restoration Program. Phase 2. Confirmation/quantification, Stage 2 for Seymour Johnson Air Force Base, North Carolina. Volume 1. Final report, July 1986-November 1988

    SciTech Connect (OSTI)

    Alexander, W.J.; Winters, S.L.; Guthrie, S.A.

    1988-11-01

    A Phase II, Stage 2 survey has been conducted at the Seymour Johnson Air Force Base under the Department of Defense's Installation Restoration Program (IRP). Six sites were identified by the Air Force for further study and include: Fire Training Area No. 3 (Site 1); Landfill No. 4 (Site 2); Landfill No. 1 (Site 3); Landfill No. 3 (Site 4); DPDO Waste Storage Area (Site 5); and Coal Pile Storage Area (Site 6). The evaluation primarily included the drilling of soil test borings, the installation, development, and sampling of new monitoring wells, resampling of selected Stage 1 monitoring wells, and the analysis of soil and water samples. A thin surficial aquifer was encountered at shallow depths beneath the sites that border the southeastern side of Stoney Creek. The surficial aquifer is contaminated at Sites 1, 2, 4, and 5 as a result of Base activities. Ground-water flow in the surficial aquifer is primarily horizontal and discharges into Stoney Creek along the northwestern limit of the Base. The major environmental concern revealed by this evaluation is the potential discharge of contaminated water from the surficial aquifer into Stoney Creek.

  2. Electric Vehicle Preparedness: Task 2, Identification of Vehicles for Installation of Data Loggers for Marine Corps Base Camp Lejeune

    SciTech Connect (OSTI)

    Schey, Stephen; Francfort, Jim

    2015-02-01

    In Task 1, a survey was completed of the inventory of non-tactical fleet vehicles at the Marine Corps Base Camp Lejeune (MCBCL) to characterize the fleet. This information and characterization was used to select vehicles for further monitoring, which involves data logging of vehicle movements in order to identify the vehicle’s mission and travel requirements. Individual observations of these selected vehicles provide the basis for recommendations related to PEV adoption. It also identifies whether a battery electric vehicle or plug-in hybrid electric vehicle (collectively referred to as PEVs) can fulfill the mission requirements and provides observations related to placement of PEV charging infrastructure. This report provides the list of vehicles selected by MCBCL and Intertek for further monitoring and fulfills the Task 2 requirements.

  3. HVAC Installed Performance

    Broader source: Energy.gov [DOE]

    This presentation was given at the Summer 2012 DOE Building America meeting on July 25, 2012, and addressed the question HVAC proper installation energy savings: over-promising or under-delivering?"

  4. HSI Configuration and Installation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Instructions below. In certain environments (e.g., if your installation is on a machine which has more than one network interface or has a high bandwidth network connection...

  5. Radiation control coatings installed on federal buildings at Tyndall Air Force Base. Volume 1: Pre-coating monitoring and fresh coating results

    SciTech Connect (OSTI)

    Petrie, T.W.; Childs, P.W.

    1997-02-01

    The US Department of Energy`s (DOE`s) Federal Energy Management Program (FEMP) supports efforts to reduce energy use and associated expenses in the federal sector. One such effort, the New Technology Demonstration Program (NTDP), seeks to evaluate new energy-saving US technologies and secure their more timely adoption by the US government. Through a partnership with a federal site, the utility serving the site, a manufacturer of an energy-related technology, and other organizations associated with these interests, DOE can evaluate a new technology. The results of the program give federal agency decision makers more hands-on information with which to validate a decision to utilize a new technology in their facilities. The partnership of these interests is secured through a cooperative research and development agreement (CRADA), in this case between Lockheed Martin Energy Research Corporation, the manager of the Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee, and ThermShield International, Ltd., the manufacturer of the technology. This is the first volume of a two-volume report that describes the effects of radiation control coatings installed on federal buildings at Tyndall Air Force Base (AFB) in Florida by ThermShield International. ORNL`s Buildings Technology Center (BTC) was assigned the responsibility for gathering, analyzing, and reporting on the data to describe the effects of the coatings. This volume describes the monitoring plan and its implementation, the results of pre-coating monitoring, the coating installation, results from fresh coatings compared to pre-coating results, and a plan to decommission the monitoring equipment. By including results from roofs at Tyndall AFB and from an outdoor test facility at the BTC, the data cover the range from poorly insulated to well-insulated roofs and two kinds of radiation control coatings on various roof membranes.

  6. Installation-Restoration Program. Phase 2. Confirmation/quantification stage 1 for Minot Air Force Base, Minot, North Dakota. Volume 2. Appendices A through F. Final report, September 1985-October 1988

    SciTech Connect (OSTI)

    Not Available

    1988-10-01

    This document in the appendices A-F for the Installation-Restoration Program Report concerning Minot Air Force Base. The overall objective of the Installation Restoration Program (IRP) Phase II investigation is to assess potential contamination at past hazardous-waste-disposal and spill sites on Air Force installations. A series of stages field investigations may be required to meet this objective. The purpose of this task is to undertake a field investigation at Minot AFB ND to: (1) confirm the presence or absence of contamination within the specified areas of investigation: (2) if possible, determine the extent and degree of contamination and the potential for migration of those contaminants in various environmental media; (3) identify public health and environmental hazards of migrating pollutants based on State or Federal standards for those contaminants; and (4) delineate additional investigations required beyond this stage to reach the Phase II objectives.

  7. Empirically Derived Strength of Residential Roof Structures for Solar Installations.

    SciTech Connect (OSTI)

    Dwyer, Stephen F.; Sanchez, Alfred; Campos, Ivan A.; Gerstle, Walter H.

    2014-12-01

    Engineering certification for the installation of solar photovoltaic (PV) modules on wood roofs is often denied because existing wood roofs do not meet structural design codes. This work is intended to show that many roofs are actually sufficiently strong given the conservatism in codes, documented allowable strengths, roof structure system effects, and beam composite action produced by joist-sheathing interaction. This report provides results from a testing program to provide actual load carrying capacity of residential rooftops. The results reveal that the actual load carrying capacity of structural members and systems tested are significantly stronger than allowable loads provided by the International Residential Code (IRC 2009) and the national structural code found in Minimum Design Loads for Buildings and Other Structures (ASCE 7-10). Engineering analysis of residential rooftops typically ignores the system affects and beam composite action in determining rooftop stresses given a potential PV installation. This extreme conservatism combined with conservatism in codes and published allowable stress values for roof building materials (NDS 2012) lead to the perception that well built homes may not have adequate load bearing capacity to enable a rooftop PV installation. However, based on the test results presented in this report of residential rooftop structural systems, the actual load bearing capacity is several times higher than published values (NDS 2012).

  8. Heating equipment installation system

    DOE Patents [OSTI]

    Meuschke, Robert E.; Pomaibo, Paul P.

    1991-01-01

    A method for installing a heater unit assembly (52, 54) in a reactor pressure vessel (2) for performance of an annealing treatment on the vessel (2), the vessel (2) having a vertical axis, being open at the top, being provided at the top with a flange (6) having a horizontal surface, and being provided internally, at a location below the flange (6), with orientation elements (8) which are asymmetrical with respect to the vertical axis, by the steps of: providing an orientation fixture (10) having an upwardly extending guide member (18) and orientation elements (14, 16) and installing the orientation fixture (10) in the vessel (2) so that the orientation elements (14,16) of the orientation fixture (10) mate with the orientation elements (8) of the pressure vessel (2) in order to establish a defined position of the orientation fixture (10) in the pressure vessel (2), and so that the guide member (18) projects above the pressure vessel (2) flange (6); placing a seal ring (30) in a defined position on the pressure vessel (2) flange (6) with the aid of the guide member (18); mounting at least one vertical, upwardly extending guide stud (40) upon the seal ring (30); withdrawing the orientation fixture (10) from the pressure vessel (2); and moving the heater unit assembly (52,54) vertically downwardly into the pressure vessel (2) while guiding the heater unit assembly (52,54) along a path with the aid of the guide stud (40).

  9. Sandia Energy - Installation Energy Security

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Installation Energy Security Home Stationary Power Safety, Security & Resilience of Energy Infrastructure Grid Modernization Resilient Electric Infrastructures Military...

  10. Recycling and processing of several typical crosslinked polymer...

    Office of Scientific and Technical Information (OSTI)

    Recycling and processing of several typical crosslinked polymer scraps with enhanced mechanical properties based on solid-state mechanochemical milling Citation Details In-Document...

  11. Quadrennial Energy Review: First Installment | Department of...

    Energy Savers [EERE]

    Quadrennial Energy Review: First Installment Quadrennial Energy Review: First Installment QUADRENNIAL ENERGY REVIEW FIRST INSTALLMENT: TRANSFORMING U.S. ENERGY INFRASTRUCTURES IN A ...

  12. Installation-Restoration Program. Phase 2. Confirmation quantification. Stage 2 for MacDill Air Force Base, Florida. Volume 1. Final report, June 1986-July 1988

    SciTech Connect (OSTI)

    Not Available

    1988-07-22

    An Installation-Restoration Program (IRP) Phase II, Stage 2 investigation was conducted at MacDill AFB and Avon Park AFR, Florida, to confirm the presence or absence of contamination at twelve sites. Eight of the twelve sites were previously investigated under Phase II, Stage I efforts. Four sites had not previously been investigated under Phase II efforts. A field program was conducted, consisting of geophysical surveys, the drilling and installation of 28 monitoring wells, an aquifer pumping test in the surficial aquifer, and the collection and analysis of ground water, surface water, and sediment samples. At MacDill AFB, no significant contaminants were found at two of the sites. These sites were recommended for no further action. At three other sites no significant contamination was found but other evidence suggested that additional study should be considered before specific action at these sites is recommended. Significant contamination was found at three sites and these sites were recommended for additional investigation. One site at MacDill AFB was recommended for remedial action. At Avon Park AFR, all three sites showed no significant contamination and were recommended for no further action.

  13. Installation-Restoration Program. Phase 2. Confirmation quantification. Stage 2 for MacDill Air Force Base, Florida. Volume 2. Final report, June 1986-July 1988

    SciTech Connect (OSTI)

    Not Available

    1988-07-22

    An Installation-Restoration Program (IRP) Phase II, Stage 2 investigation was conducted at MacDill AFB and Avon Park AFR, Florida, to confirm the presence or absence of contamination at twelve sites. Eight of the twelve sites were previously investigated under Phase II, Stage 1 efforts. Four sites had not previously been investigated under Phase II efforts. A field program was conducted, consisting of geophysical surveys, the drilling and installation of 28 monitoring wells, an aquifer pumping test in the surficial aquifer, and the collection and analysis of ground water, surface water, and sediment samples. At MacDill AFB, no significant contaminants were found at two of the sites. These sites were recommended for no further action. At three other sites no significant contamination was found but other evidence suggested that additional study should be considered before specific action at these sites is recommended. Significant contamination was found at three sites and these sites were recommended for additional investigation. One site at MacDill AFB was recommended for remedial action. At Avon Park AFR, all three sites showed no significant contamination and were recommended for no further action.

  14. Safety Culture in Nuclear Installations

    Broader source: Energy.gov [DOE]

    IAEA-TECDOC-1329 Safety Culture in Nuclear Installations, Guidance for use in the Enhancement of Safety Culture, International Atomic Energy Agency IAEA, December 2002.

  15. CHP Installed Capacity Optimizer Software

    Energy Science and Technology Software Center (OSTI)

    2004-11-30

    The CHP Installed Capacity Optimizer is a Microsoft Excel spreadsheet application that determines the most economic amount of capacity of distributed generation and thermal utilization equipment (e.g., absorption chillers) to install for any user-defined set of load and cost data. Installing the optimum amount of capacity is critical to the life-cycle economic viability of a distributed generation/cooling heat and power (CHP) application. Using advanced optimization algorithms, the software accesses the loads, utility tariffs, equipment costs,more » etc., and provides to the user the most economic amount of system capacity to install.« less

  16. Enhanced Control Installations.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    correctness. Title: Individual Permit, High Priority Sites, Examples of Enhanced Control Installations, Poster, Individual Permit for Storm Water, NPDES Permit No. NM0030759...

  17. Factors Affecting PMU Installation Costs

    Broader source: Energy.gov (indexed) [DOE]

    ... information to improve the modeling, forecasting and controls of the grid Standards ... Department of Energy |September 2014 Factors Affecting PMU Installation Costs | Page 3 ...

  18. New Eddy Correlation Systems Installed

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Preliminary results were very promising, indicating that the new system could operate flawlessly and could withstand power outages. Subsequently, four systems have been installed ...

  19. Net Zero Energy Installations (Presentation)

    SciTech Connect (OSTI)

    Booth, S.

    2012-05-01

    A net zero energy installation (NZEI) is one that produces as much energy from on-site renewable sources as it consumes. NZEI assessment provides a systematic approach to energy projects.

  20. Magnet Girder Assembly and Installation

    ScienceCinema (OSTI)

    None

    2013-07-17

    It takes teamwork to assemble and install magnet girders for the storage ring of the National Synchrotron Light Source II. NSLS-II is now under construction at Brookhaven Lab.

  1. Microhydro System Design and Installation

    Broader source: Energy.gov [DOE]

    This 1-1/2 day workshop will cover the basics of small scale hydro power with a field trip to local microhydro installation. Participants will learn about: site assessment techniques including the...

  2. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in...

  3. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in ...

  4. CNTA_Well_Installation_Report.book

    Office of Legacy Management (LM)

    Well Installation Report for Corrective Action Unit 443, Central Nevada Test Area Nye ... WELL INSTALLATION REPORT FOR CORRECTIVE ACTION UNIT 443, CENTRAL NEVADA TEST AREA NYE ...

  5. Structural considerations for solar installers : an approach...

    Office of Scientific and Technical Information (OSTI)

    Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits. Citation Details In-Document Search Title: Structural ...

  6. Better Buildings Neighborhood Program Data Installed Measures...

    Energy Savers [EERE]

    Installed Measures Better Buildings Neighborhood Program Data Installed Measures Building project data for 75,110 single-family homes upgraded between July 1, 2010, and September ...

  7. The Draugen platform and subsea structures, installation and foundation aspects

    SciTech Connect (OSTI)

    Alm, T.; Bye, A.; Sandvik, K.; Egeland, S.

    1995-12-01

    Installation data from the Draugen GBS and subsea structures have been processed and analyzed in order to verify the design assumptions with regards to soil reactions. These results have shown that penetration of concrete skirts and piles into the very hard clay layer, typically found at the Haltenbanken area is feasible. The resistances may be predicted with reasonable accuracy using conventional methods and average soil strength values as obtained by traditional soil testing. This paper reveals and comments the installation data both for the gravity platform and the piles for the different subsea structures and provides and updated basis for foundation design of similar structures in the area.

  8. Aasgard subsea installation on schedule

    SciTech Connect (OSTI)

    Perdue, J.M.

    1998-09-01

    Statoil`s Aasgard A FPSO vessel is set to sail away from the Aker Stord yard on November 22, 1998, and construction of the Aasgard B semisubmersible gas platform has begun at the Daewoo yard in Korea. While Aasgard A and Aasgard B are receiving a lot of attention on land, the Aasgard subsea installation is quietly being readied for the big day.

  9. Milwaukee Installer Reflects on His Career In Solar | Department...

    Broader source: Energy.gov (indexed) [DOE]

    market. Follow our weeklong series to hear from Milwaukee-based installers, residents and city leaders on what it's like to be a part of this solar community. Share your...

  10. Oklahoma Tribe to Install Solar Roof

    Broader source: Energy.gov [DOE]

    An Indian tribe in Anadarko, Oklahoma is installing solar panel roofs on two tribal government buildings.

  11. Infiniband cables installed | Argonne Leadership Computing Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Infiniband cables installed Download original image « Back to galleryItem 8

  12. Impact of Installation Faults on Heat Pump Performance

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Hourahan, Glenn; Baxter, Van D.

    2015-01-01

    Numerous studies and surveys indicate that typically-installed HVAC equipment operate inefficiently and waste considerable energy due to varied installation errors (faults) such as improper refrigerant charge, incorrect airflow, oversized equipment, and leaky ducts. This article summarizes the results of a large United States (U.S.) experimental/analytical study (U.S. contribution to IEA HPP Annex 36) of the impact that different faults have on the performance of an air-source heat pump (ASHP) in a typical U.S. single-family house. It combines building effects, equipment effects, and climate effects in an evaluation of the faults impact on seasonal energy consumption through simulations of the house/ASHPmore » pump system.« less

  13. Impact of Installation Faults on Heat Pump Performance

    SciTech Connect (OSTI)

    Hourahan, Glenn; Baxter, Van D.

    2015-01-01

    Numerous studies and surveys indicate that typically-installed HVAC equipment operate inefficiently and waste considerable energy due to varied installation errors (faults) such as improper refrigerant charge, incorrect airflow, oversized equipment, and leaky ducts. This article summarizes the results of a large United States (U.S.) experimental/analytical study (U.S. contribution to IEA HPP Annex 36) of the impact that different faults have on the performance of an air-source heat pump (ASHP) in a typical U.S. single-family house. It combines building effects, equipment effects, and climate effects in an evaluation of the faults impact on seasonal energy consumption through simulations of the house/ASHP pump system.

  14. Engineering report for simulated riser installation

    SciTech Connect (OSTI)

    Brevick, C.H., Westinghouse Hanford

    1996-05-09

    The simulated riser installation field tests demonstrated that new access ports (risers) can be installed safely, quickly, and economically in the concrete domes of existing underground single- shell waste storage tanks by utilizing proven rotary drilling equipment and vacuum excavation techniques. The new riser installation will seal against water intrusion, provide as table riser anchored to the tank dome, and be installed in accordance with ALARA principles. The information contained in the report will apply to actual riser installation activity in the future.

  15. Largest Taiwan SPM terminal installed

    SciTech Connect (OSTI)

    Schultz, A.R. )

    1992-02-17

    This paper reports on the largest Taiwan single-point mooring (SPM) terminal. Chinese Petroleum Corp. (CPC) last year installed and commissioned Taiwan's SPM terminal. This, the third of four planned SPM terminals, is unloading 100,000-300,000 dwt crude-oil tankers 5 miles offshore Kaohsiung, Taiwan, on the southwest coast of the Republic of China. Construction on the fourth SPM terminal, for unloading naphtha and diesel gas oil from 20,000 -100,000 dwt tankers, began late last year. The third terminal consists of a catenary anchor leg mooring (CALM) system, a 56-in, (1,422 mm) OD crude-oil pipeline and a 16-in. (406 mm) OD fuel-oil pipeline. The subsea pipelines extend from the CALM installed in a water depth of 118 ft to an existing shore tank farm tie-in valve station.

  16. LANL installs additional protective measures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lab completes additional protections LANL installs additional protective measures Work crews completed additional flood and erosion-control measures this week to reduce the environmental effects of any flash floods following the Las Conchas Fire. July 20, 2011 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma

  17. New Berkeley Lab Report Tracks a Decade of PV Installed Cost Trends

    SciTech Connect (OSTI)

    Barbose, Galen; Peterman, Carla; Wiser, Ryan

    2009-04-15

    Installations of PV systems have been expanding at a rapid pace in recent years. In the United States, the market for PV is driven by national, state, and local government incentives, including upfront cash rebates, production-based incentives, requirements that electricity suppliers purchase a certain amount of solar energy, and Federal and state tax benefits. These programs are, in part, motivated by the popular appeal of solar energy and by the positive attributes of PV - e.g., modest environmental impacts, avoidance of fuel price risks, coincidence with peak electrical demand, and the location of PV at the point of use. Given the relatively high cost of PV, however, a key goal of these policies is to encourage cost reductions over time. Therefore, as policy incentives have become more significant and as PV deployment has accelerated, so too has the desire to track the installed cost of PV systems over time, by system characteristics, by system location, and by component. A new Lawrence Berkeley National Laboratory report, 'Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007', helps to fill this need by summarizing trends in the installed cost (i.e., the cost paid by the system owner) of grid-connected PV systems in the U.S. The report is based on an analysis of project-level cost data from nearly 37,000 residential and non-residential PV systems completed from 1998-2007 and installed on the utility-customer-side of the meter. These systems total 363 MW, equal to 76% of all grid-connected PV capacity installed in the U.S. through 2007, representing the most comprehensive data source available on the installed cost of PV in the United States. The data were obtained from administrators of PV incentive programs around the country, who typically collect installed cost data for systems receiving incentives. A total of 16 programs, spanning 12 states, ultimately provided data for the study. Reflecting the broader geographical trends in the

  18. Automated solar collector installation design

    DOE Patents [OSTI]

    Wayne, Gary; Frumkin, Alexander; Zaydman, Michael; Lehman, Scott; Brenner, Jules

    2014-08-26

    Embodiments may include systems and methods to create and edit a representation of a worksite, to create various data objects, to classify such objects as various types of pre-defined "features" with attendant properties and layout constraints. As part of or in addition to classification, an embodiment may include systems and methods to create, associate, and edit intrinsic and extrinsic properties to these objects. A design engine may apply of design rules to the features described above to generate one or more solar collectors installation design alternatives, including generation of on-screen and/or paper representations of the physical layout or arrangement of the one or more design alternatives.

  19. File:Install.pdf | Open Energy Information

    Open Energy Info (EERE)

    Install.pdf Jump to: navigation, search File File history File usage File:Install.pdf Size of this preview: 463 599 pixels. Other resolution: 464 600 pixels. Full resolution...

  20. WINDExchange: U.S. Installed Wind Capacity

    Wind Powering America (EERE)

    Education Printable Version Bookmark and Share Workforce Development Collegiate Wind Competition Wind for Schools Project School Project Locations Education & Training Programs Curricula & Teaching Materials Resources Installed Wind Capacity This page has maps of the United States that show installed wind capacity by state and its progression. This map shows the installed wind capacity in megawatts. As of June 30, 2015, 67,870 megawatts have been installed. Alaska, 62 megawatts; Hawaii,

  1. ADA Requirements for Workplace Charging Installation | Department...

    Broader source: Energy.gov (indexed) [DOE]

    ADA Requirements for Workplace Charging Installation More Documents & Publications Richmond Electric Vehicle Initiative Electric Vehicle Readiness Plan Workplace Charging...

  2. Quadrennial Energy Review Second Installment Electricity: Generation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quadrennial Energy Review Second Installment Electricity: Generation to End Use ... Midwest and Florida Regions, Duke Energy Corporation * Mike Langford, National ...

  3. Carpe Diem: Install Insulated Roman Shades

    Broader source: Energy.gov [DOE]

    As I mentioned in yesterday's blog, I had insulated window quilts installed on most of my home's windows.

  4. A NEW RUSSIAN WASTE MANAGEMENT INSTALLATION

    SciTech Connect (OSTI)

    Griffith, Andrew; Engxy, Thor; Endregard, Monica; Schwab, Patrick; Nazarian, Ashot; Krumrine, Paul; Backe, Steinar; Gorin, Stephen; Evans, Brent

    2003-02-27

    waste in various conditions, treat it, package it in standard 200-liter drums, and load these drums into the new transportation and storage containers. The MPF has been designed, fabricated, and assembled at the fabrication site, the Zvezdochka Shipyard. It passed a demonstration test in September 2002. The entire MPF has been disassembled into its transportable modules, which are currently stored at the Zvezdochka Shipyard. In the spring of 2003, the MPF modules will be transported to the Polyarninsky Shipyard, where they will be reassembled and the facility will be cold tested. The site preparation work is already under way for the installation at the Polyarninsky Shipyard. An automatic radiation monitoring system, PICASSO-AMEC, has been developed and will be installed at Polyarninsky Shipyard as one of the elements of the installation. The radiation monitoring system is based on the software package PICASSO-3, developed by the Institute for Energy Technology in Norway. Treated waste f rom the MPF will require safe and secure storage. The Waste Storage Facility will be connected to the MPF, and it will be large enough to store all 400 of the new containers. Incoming waste boxes in overpacks will enter one part of the storage facility on trucks. Then they will be inspected and transferred into the MPF through the receiving area. Drums of processed waste in containers will be removed from the MPF and stacked in another part of the storage facility via a bridge crane. This facility will be designed and construction will begin during the winter of 2002/2003.

  5. NREL Releases Updated Typical Meteorological Year Data Set - News Releases

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    | NREL NREL Releases Updated Typical Meteorological Year Data Set May 1, 2008 The U.S. Department of Energy's National Renewable Energy Laboratory (NREL) today released an updated typical meteorological year (TMY) data set derived from the 1991-2005 National Solar Radiation Data Base update. The TMY3 data and user's manual are available at http://rredc.nrel.gov/solar/old_data/nsrdb/1991-2005/tmy3. The new data sets update and expand the TMY2 data sets released by NREL in 1994. The TMY3 data

  6. New concept for a general purpose subsea installation system

    SciTech Connect (OSTI)

    Citi, G.; Cowen, S.; Radicioni, A.

    1996-12-31

    The first use of the Agip SAF System (Sistema Alti Fondali), an installation and maintenance system for subsea production systems up to 1,000 m water depth, was successfully performed on the Luna 40 well in 180 m w.d. The system successfully installed the christmas tree, flowline jumpers, control system and high pressure cap as well as deploying the LMRP to allow the commissioning of the well. The SAF system performed all the planned tasks during the installation of the Luna 40 subsea tree and now has to be considered an operational success. The system is based around a Master Vehicle that provides hydraulic power to, and controls a set of dedicated work modules. During the 2 test and 5 working dives, the Master Vehicle and the modules were subsea for a considerable period of time, up to 75 hours continuously, without any operational failures. This installation uncovered some system deficiencies that will have to be studied to improve the reliability and operability of the system. From the experience gained during this operation it has been shown that the system of a Master Vehicle providing locally generated hydraulic power is a feasible approach to many subsea installation problems. This paper describes the SAF system including improvements to be performed before being used operationally in up to 1,000 m of water and over. It also covers the necessary modifications required to allow the system to be deployed from a wide range of installation vessel.

  7. Renewable Energy Opportunities at the Kanto Installations, Japan

    SciTech Connect (OSTI)

    Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.; Gorrissen, Willy J.; Kora, Angela R.; Weimar, Mark R.; Hand, James R.; Orrell, Alice C.; Williamson, Jennifer L.

    2010-09-24

    This document provides an overview of renewable resource development potential at the U.S. Army installations in the Kanto region in Japan, which includes Camp Zama, Yokohama North Dock, Sagamihara Family Housing Area (SFHA), Sagami General Depot, and Akasaka Press Center. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the Huntsville Army Corps of Engineers, and includes the development of a methodology for renewable resource assessment at Army installations located on foreign soil. The methodology is documented in Renewable Energy Assessment Methodology for Japanese OCONUS Army Installations. The site visit to the Kanto installations took place on April 5 and 6, 2010. At the current time, there are some renewable technologies that show economic potential. Because of siting restrictions and the small size of these installations, development of most renewable energy technologies will likely be limited to Camp Zama. Project feasibility is based on installation-specific resource availability and energy costs and projections based on accepted life-cycle cost methods. Development of any renewable energy project will be challenging, as it will require investigation into existing contractual obligations, new contracts that could be developed, the legality of certain partnerships, and available financing avenues, which involves the U.S. Forces Japan (USFJ), the Government of Japan (GOJ), and a number of other parties on both sides. The Army will not be able to implement a project without involvement and approval from the other services and multiple levels of Japanese government. However, implementation of renewable energy projects could be an attractive method for GOJ to reduce greenhouse gas emissions and lower annual utility payments to USFJ. This report recommends projects to pursue and offers approaches to use. The most

  8. Energy conservation in typical Asian countries

    SciTech Connect (OSTI)

    Yang, M.; Rumsey, P.

    1997-06-01

    Various policies and programs have been created to promote energy conservation in Asia. Energy conservation centers, energy conservation standards and labeling, commercial building codes, industrial energy use regulations, and utility demand-side management (DSM) are but a few of them. This article attempts to analyze the roles of these different policies and programs in seven typical Asian countries: China, Indonesia, Japan, Pakistan, South Korea, the Philippines, and Thailand. The conclusions show that the two most important features behind the success policies and programs are (1) government policy support and (2) long-run self-sustainability of financial support to the programs.

  9. Community Wind Handbook/Find an Installer | Open Energy Information

    Open Energy Info (EERE)

    * Submit Permit Applications * Find an Installer * Purchase Equipment * Plan for Maintenance Find an Installer Homeowners, ranchers, and small businesses can install wind...

  10. Environmental Assessment Kotzebue Wind Installation Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment \ Kotzebue Wind Installation Project Kotzebue, Alaska U. S. Department of Energy Golden Field Office 16 17 Cole Boulevard Golden, Colorado May 1998 Environmental Assessment Kotzebue Wind Installation Project Kotzebue, Alaska U. S . Department of Energy Golden Field Office 1617 Cole Boulevard Golden, Colorado May 1998 Finding of No Significant Impact Environmental Assessment Kotzebue Wind Installation Project Kotzebue, Alaska F'INDING OF NO SIGNIFICANT IMPACT for KOTZEBUE WIND

  11. Backup Power Installed for WIPP EOC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Backup Power Installed for WIPP EOC The Waste Isolation Pilot Plant's (WIPP) Emergency Operations Center (EOC) will soon have guaranteed operation in the event of a power outage. ...

  12. Photovoltaic Systems Installed in Philadelphia Neighborhood

    Office of Energy Efficiency and Renewable Energy (EERE)

    This photograph features the 6-kilowatt (kw) rooftop photovoltaic system that Mercury Solar Systems installed in the Lower Kensington neighborhood of Philadelphia.

  13. Hawaii Well Construction & Pump Installation Standards | Open...

    Open Energy Info (EERE)

    Handbook Abstract This document provides an overview of the well construction and pump installation standards in Hawaii. Author State of Hawaii Commission on Water Resource...

  14. Hawaii Well Construction & Pump Installation Standards Webpage...

    Open Energy Info (EERE)

    Standards Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Hawaii Well Construction & Pump Installation Standards Webpage Abstract This webpage...

  15. Quadrennial Energy Review Second Installment Electricity: Generation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... North America with a wide array of strategic and ... Northwestern University. 6 Panel 2: Electricity Distribution ... largest distributed solar installation project and ...

  16. Active solar heating systems installation manual

    SciTech Connect (OSTI)

    Not Available

    1991-01-01

    This book provides an industry consensus of the best available installation procedures for large commercial-scale solar service water and space heating systems.

  17. Quadrennial Energy Review - Second Installment Electricity: Generation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - Second Installment Electricity: Generation to End-Use Stakeholder Meeting Number 3: ... ancillary service, day-ahead energy, and unit commitment markets while becoming the balancing ...

  18. Quadrennial Energy Review Second Installment Electricity: Generation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Second Installment Electricity: Generation to End-Use ... Power Generation and Transmission: How Can We Plan, ... recent announcement represents a 3.6 billion investment. ...

  19. ADA Requirements for Workplace Charging Installation | Department...

    Broader source: Energy.gov (indexed) [DOE]

    This Guidance provides best practices, special design guidelines and requirements for installing plug-in electric vehicle charging stations in compliance with ADA. When designing ...

  20. Renewable Energy Assessment Methodology for Japanese OCONUS Army Installations

    SciTech Connect (OSTI)

    Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.; Gorrissen, Willy J.; Kora, Angela R.; Weimar, Mark R.; Hand, James R.; Orrell, Alice C.; Williamson, Jennifer L.

    2010-08-30

    Since 2005, Pacific Northwest National Laboratory (PNNL) has been asked by Installation Management Command (IMCOM) to conduct strategic assessments at selected US Army installations of the potential use of renewable energy resources, including solar, wind, geothermal, biomass, waste, and ground source heat pumps (GSHPs). IMCOM has the same economic, security, and legal drivers to develop alternative, renewable energy resources overseas as it has for installations located in the US. The approach for continental US (CONUS) studies has been to use known, US-based renewable resource characterizations and information sources coupled with local, site-specific sources and interviews. However, the extent to which this sort of data might be available for outside the continental US (OCONUS) sites was unknown. An assessment at Camp Zama, Japan was completed as a trial to test the applicability of the CONUS methodology at OCONUS installations. It was found that, with some help from Camp Zama personnel in translating and locating a few Japanese sources, there was relatively little difficulty in finding sources that should provide a solid basis for conducting an assessment of comparable depth to those conducted for US installations. Project implementation will likely be more of a challenge, but the feasibility analysis will be able to use the same basic steps, with some adjusted inputs, as PNNL’s established renewable resource assessment methodology.

  1. Intelligent devices simplify remote SCADA installations in substations

    SciTech Connect (OSTI)

    Kopriva, V.J.

    1994-12-31

    Utilities are increasingly relying on Supervisory Control and Data Acquisition (SCADA) Systems for the effective and economical management of electric transmission and distribution systems. Now, advances in equipment and design technologies have created opportunities for an increased level of monitoring and control at electric power substations. In the past, prohibitive factors, including complicated equipment and wiring retrofits, protocol compatibility, and hardware installation and maintenance costs have impeded electric utilities in their attempt at broad based application of SCADA systems in electric substations, particularly at distribution voltage levels. These advances in equipment technologies have provided utilities with the opportunity to install and operate SCADA systems at lower cost, while providing flexibility for system expansion over longer periods. The development of intelligent microprocessor controlled devices and integrated communications has facilitated the use of a distributed design approach to installing SCADA monitoring and control in substations. This approach offers greater hardware flexibility and reduced installation costs while increasing reliability, making the addition of monitoring and control to electric substations increasingly practical. This paper will examine current trends in the application of intelligent microprocessor controlled and electronic devices, in stand alone and distributed applications, and the simplification of techniques for installing SCADA systems in substations. It will also consider the potential advantages to be realized in cost and reliability, and examine the necessary changes in design and operation philosophies required to effectively implement the new technology.

  2. WPN 93-5: Recommended Installation Standards for Mobile Homes

    Broader source: Energy.gov [DOE]

    To provide technical assistance to the states on recommended installation techniques for weatherization materials installed on mobile homes.

  3. Evaluation of Trenchless Installation Technology for Radioactive Wastewater Piping Applications

    SciTech Connect (OSTI)

    Robinson, Sharon M; Jubin, Robert Thomas; Patton, Bradley D; Sullivan, Nicholas M; Bugbee, Kathy P

    2009-09-01

    sanitary sewer and natural gas pipeline industries, they have been used far less in contaminated environments. Although trenchless technologies have been used at ORNL in limited applications to install new potable water and gas lines, the technologies have not been used in radioactive applications. This study evaluates the technical risks, benefits, and economics for installing gravity drained and pressurized piping using trenchless technologies compared to conventional installation methods for radioactive applications under ORNL geological conditions. A range of trenchless installation technologies was reviewed for this report for general applicability for replacing existing contaminated piping and/or installing new pipelines in potentially contaminated areas. Installation methods that were determined to have potential for use in typical ORNL contaminated environments were then evaluated in more detail for three specific ORNL applications. Each feasible alternative was evaluated against the baseline conventional open trench installation method using weighted criteria in the areas of environment, safety, and health (ES&H); project cost and schedule; and technical operability. The formulation of alternatives for evaluation, the development of selection criteria, and the scoring of alternatives were performed by ORNL staff with input from vendors and consultants. A description of the evaluation methodology and the evaluation results are documented in the following sections of this report.

  4. Maximum Photovoltaic Penetration Levels on Typical Distribution Feeders: Preprint

    SciTech Connect (OSTI)

    Hoke, A.; Butler, R.; Hambrick, J.; Kroposki, B.

    2012-07-01

    This paper presents simulation results for a taxonomy of typical distribution feeders with various levels of photovoltaic (PV) penetration. For each of the 16 feeders simulated, the maximum PV penetration that did not result in steady-state voltage or current violation is presented for several PV location scenarios: clustered near the feeder source, clustered near the midpoint of the feeder, clustered near the end of the feeder, randomly located, and evenly distributed. In addition, the maximum level of PV is presented for single, large PV systems at each location. Maximum PV penetration was determined by requiring that feeder voltages stay within ANSI Range A and that feeder currents stay within the ranges determined by overcurrent protection devices. Simulations were run in GridLAB-D using hourly time steps over a year with randomized load profiles based on utility data and typical meteorological year weather data. For 86% of the cases simulated, maximum PV penetration was at least 30% of peak load.

  5. Cray to Install Cascade System at NERSC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cray to Install Cascade System at NERSC Cray to Install Cascade System at NERSC June 27, 2012 by Richard Gerber Cray will install a next-generation supercomputer code-named "Cascade" and a next-generation Cray Sonexion storage system at NERSC. Read the press release. Subscribe via RSS Subscribe Browse by Date August 2016 June 2016 May 2016 April 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 April 2015 March 2015 January 2015 December

  6. Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.

    SciTech Connect (OSTI)

    Richards, Elizabeth H.; Schindel, Kay; Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William; Harper, Alan

    2011-12-01

    Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

  7. North Shore Gas- Single Family Direct Install

    Broader source: Energy.gov [DOE]

    Owners of single-family homes, condos, townhomes and two-flats may be eligible for a free installation of new programmable thermostats, pipe insulation, showerheads, Compact Fluorescent Bulbs (CFLs...

  8. Help Your Employer Install Electric Vehicle Charging

    Broader source: Energy.gov [DOE]

    Educate your employer about the benefits of installing plug-in electric vehicle (PEV) workplace charging. Use the resources below and the Plug-in Electric Vehicle (PEV) Handbook for Workplace...

  9. Install an Automatic Blowdown Control System

    SciTech Connect (OSTI)

    Not Available

    2006-01-01

    This revised ITP steam tip sheet on installing automatic blowdown controls provide how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  10. Workplace Charging Equipment and Installation Costs | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Charging equipment costs depend on the type of charging station you decide to install in your workplace. Level 1 (300-1,500) and Level 2 (400-6,500) charging stations are ...

  11. Weatherization Installer/Technician Fundamentals 2.0 - Roofing, Flashing,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Attic Ventilation Installation Needs | Department of Energy Roofing, Flashing, and Attic Ventilation Installation Needs Weatherization Installer/Technician Fundamentals 2.0 - Roofing, Flashing, and Attic Ventilation Installation Needs Roofing, Flashing, and Attic Ventilation Installation Needs - Complete (4.45 MB) Lesson Plan: Roofing, Flashing, and Attic Ventilation Installation Needs (127.32 KB) PowerPoint: Roofing, Flashing, and Attic Ventilation Installation Needs (4.39 MB) More

  12. Transforming PV Installations toward Dispatchable, Schedulable Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solutions | Department of Energy Transforming PV Installations toward Dispatchable, Schedulable Energy Solutions Transforming PV Installations toward Dispatchable, Schedulable Energy Solutions Advanced Energy logo.png -- This project is inactive -- Advanced Energy (AE) will address three important needs in the further deployment of photovoltaic (PV) systems: 1) demonstrating and commercializing a new anti-islanding method utilizing Phasor Measurement Units (PMUs), 2) demonstrating a set of

  13. Installation on Multifamily Retrofits | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Multifamily Retrofits » Installation on Multifamily Retrofits Installation on Multifamily Retrofits Over the last thirty years, DOE's Weatherization Assistance Program has cultivated the most experienced and connected group of whole-building energy retrofit professionals in the nation. The Weatherization Program has weatherized nearly 300,000 multifamily units since Graphic describing the Weatherization workforce as trained, equipped, and accountable. 2010. Many groups within the Weatherization

  14. Foldtrack Installation in C-110 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Installation in C-110 Foldtrack Installation in C-110 Addthis Description Crews successfully installed a new and improved version of the Foldtrack into tank C-110, a single-shell tank with about 17,200 gallons of waste remaining

  15. Design and installation manual for thermal energy storage

    SciTech Connect (OSTI)

    Cole, R L; Nield, K J; Rohde, R R; Wolosewicz, R M

    1980-01-01

    The purpose of this manual is to provide information on the design and installation of thermal energy storage in active solar systems. It is intended for contractors, installers, solar system designers, engineers, architects, and manufacturers who intend to enter the solar energy business. The reader should have general knowledge of how solar heating and cooling systems operate and knowledge of construction methods and building codes. Knowledge of solar analysis methods such as f-Chart, SOLCOST, DOE-1, or TRNSYS would be helpful. The information contained in the manual includes sizing storage, choosing a location for the storage device, and insulation requirements. Both air-based and liquid-based systems are covered with topics on designing rock beds, tank types, pump and fan selection, installation, costs, and operation and maintenance. Topics relevant to latent heat storage include properties of phase-change materials, sizing the storage unit, insulating the storage unit, available systems, and cost. Topics relevant to heating domestic water include safety, single- and dual-tank systems, domestic water heating with air- and liquid-based space heating systems, and stand alone domestics hot water systems. Several appendices present common problems with storage systems and their solutions, heat transfer fluid properties, economic insulation thickness, heat exchanger sizing, and sample specifications for heat exchangers, wooden rock bins, steel tanks, concrete tanks, and fiberglass-reinforced plastic tanks.

  16. Fluid assisted installation of electrical cable accessories

    DOE Patents [OSTI]

    Mayer, Robert W.; Silva, Frank A.

    1977-01-01

    An electrical cable accessory includes a generally tubular member of elastomeric material which is to be installed by placement over a cylindrical surface to grip the cylindrical surface, when in appropriate assembled relation therewith, with a predetermined gripping force established by dilation of the tubular member, the installation being facilitated by introducing fluid under pressure, through means provided in the tubular member, between the tubular member and the cylindrical surface, and simultaneously impeding the escape of the fluid under pressure from between the tubular member and the cylindrical surface by means adjacent one of the ends of the tubular member to cause dilation of the tubular member and establish a fluid layer between the tubular member and the cylindrical surface, thereby reducing the gripping force during installation.

  17. Development of a coiled tubing cable installation system

    SciTech Connect (OSTI)

    Newman, K.R.; Haver, N.A.; Stone, L.R.

    1995-12-31

    A system has been developed which installs and de-installs an electric wireline cable in coiled tubing (CT) while the CT is still on the reel. This cable installation system reduces the cost of a cable installation significantly compared with previous installation methods. This paper discusses the need for such a system, the theory used to develop this system, the various concepts considered, the system that was developed and test installation cases.

  18. Alternative Fuels Data Center: Installing New E85 Equipment

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Installing New E85 Equipment to someone by E-mail Share Alternative Fuels Data Center: Installing New E85 Equipment on Facebook Tweet about Alternative Fuels Data Center: Installing New E85 Equipment on Twitter Bookmark Alternative Fuels Data Center: Installing New E85 Equipment on Google Bookmark Alternative Fuels Data Center: Installing New E85 Equipment on Delicious Rank Alternative Fuels Data Center: Installing New E85 Equipment on Digg Find More places to share Alternative Fuels Data

  19. Defining the Effectiveness of UV Lamps Installed in Circulating...

    Office of Scientific and Technical Information (OSTI)

    Installed in Circulating Air Ductwork Citation Details In-Document Search Title: Defining the Effectiveness of UV Lamps Installed in Circulating Air Ductwork You are ...

  20. Defining the Effectiveness of UV Lamps Installed in Circulating...

    Office of Scientific and Technical Information (OSTI)

    Installed in Circulating Air Ductwork Citation Details In-Document Search Title: Defining the Effectiveness of UV Lamps Installed in Circulating Air Ductwork Germicidal ...

  1. Defining the Effectiveness of UV Lamps Installed in Circulating...

    Office of Scientific and Technical Information (OSTI)

    Installed in Circulating Air Ductwork Citation Details In-Document Search Title: Defining the Effectiveness of UV Lamps Installed in Circulating Air Ductwork Ultraviolet; UV; ...

  2. Design and Installation of a Disposal Cell Cover Field Test ...

    Office of Environmental Management (EM)

    Design and Installation of a Disposal Cell Cover Field Test Design and Installation of a Disposal Cell Cover Field Test Paper presented at the Waste Management 2011 Conference. ...

  3. Property:Installed Capacity (MW) | Open Energy Information

    Open Energy Info (EERE)

    Installed Capacity (MW) Jump to: navigation, search Property Name Installed Capacity (MW) Property Type Number Retrieved from "http:en.openei.orgwindex.php?titleProperty:Insta...

  4. Utah Underground Storage Tank Installation Permit | Open Energy...

    Open Energy Info (EERE)

    Storage Tank Installation Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: Utah Underground Storage Tank Installation Permit Form Type Application...

  5. U.S. Installation, Operation, and Performance Standards for Microturbi...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Installation, Operation, and Performance Standards for Microturbine Generator Sets, August 2000 U.S. Installation, Operation, and Performance Standards for Microturbine Generator ...

  6. Evaluation of Trenchless Technologies for Installation of Pipelines...

    Office of Scientific and Technical Information (OSTI)

    for Installation of Pipelines in Radioactive Environments - 10249 Citation Details In-Document Search Title: Evaluation of Trenchless Technologies for Installation of ...

  7. Sandia Energy - Molten Salt Test Loop Pump Installed

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Energy News Concentrating Solar Power Solar Energy Storage Systems Molten Salt Test Loop Pump Installed Previous Next Molten Salt Test Loop Pump Installed The pump was...

  8. Fact #893: October 5, 2015 Incentives for the Installation of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: October 5, 2015 Incentives for the Installation of Electric Vehicle Charging Stations - Dataset Fact 893: October 5, 2015 Incentives for the Installation of Electric Vehicle ...

  9. Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007

    SciTech Connect (OSTI)

    Wiser, Ryan; Barbose, Galen; Peterman, Carla

    2009-02-11

    As installations of grid-connected solar photovoltaic (PV) systems have grown, so too has the desire to track the installed cost of these systems over time, by system characteristics, by system location, and by component. This report helps to fill this need by summarizing trends in the installed cost of grid-connected PV systems in the United States from 1998 through 2007. The report is based on an analysis of installed cost data from nearly 37,000 residential and non-residential PV systems, totaling 363 MW of capacity, and representing 76percent of all grid-connected PV capacity installed in the U.S. through 2007.

  10. Electron circuits: semiconductor laser multiple use installation

    SciTech Connect (OSTI)

    Zhou, F.; Fan, J.; Weng, D.

    1983-04-01

    A light source for a multiple use installation using a same matter junction or different matter junction GaAlAs/GaAs semiconductor laser, which has the advantages of high interference resistance, long transmission distance (tens to hundreds of meters), good security, and low power consumption in addition, the controller of the light source has multiple usages of alarming, switching and counting is presented. The multiple use installation can be used in control of breaking warps and counting on roving waste machines, warping machines and silk weaving machines in the textile industry long distance speed measurement, alarming and counting in machinery, electricity and chemical industries and alarming and control of water levels in reservoirs, rivers and water towers, as well as blockade alarming and control of important divisions. This multiple use installation is composed of two parts a laser emitter and a receiving device. The former component is used to produce the laser after the receiver receives the laser, the installation completes operations of alarming, switching and counting.

  11. Factors Affecting PMU Installation Costs (October 2014)

    Broader source: Energy.gov [DOE]

    The Department of Energy investigated the major cost factors that affected PMU installation costs for the synchrophasor projects funded through the Recovery Act Smart Grid Programs. The data was compiled through interviews with the nine projects that deployed production grade synchrophasor systems.

  12. Portland Advancing Green Image With Solar Installs

    Broader source: Energy.gov [DOE]

    A quick Internet search reveals that many sources consider Portland, Ore., to be one of the most green-minded cities in the United States. But large upfront costs have been a barrier for citizens looking to install solar power systems in the past. Now, a neighborhood solar initiative is helping communities organize to get solar discounts, meaning the city could become even greener.

  13. COMPREHENSIVE DIAGNOSTIC AND IMPROVEMENT TOOLS FOR HVAC-SYSTEM INSTALLATIONS IN LIGHT COMMERCIAL BUILDINGS

    SciTech Connect (OSTI)

    Abram Conant; Mark Modera; Joe Pira; John Proctor; Mike Gebbie

    2004-10-31

    Proctor Engineering Group, Ltd. (PEG) and Carrier-Aeroseal LLP performed an investigation of opportunities for improving air conditioning and heating system performance in existing light commercial buildings. Comprehensive diagnostic and improvement tools were created to address equipment performance parameters (including airflow, refrigerant charge, and economizer operation), duct-system performance (including duct leakage, zonal flows and thermal-energy delivery), and combustion appliance safety within these buildings. This investigation, sponsored by the National Energy Technology Laboratory, a division of the U.S. Department of Energy, involved collaboration between PEG and Aeroseal in order to refine three technologies previously developed for the residential market: (1) an aerosol-based duct sealing technology that allows the ducts to be sealed remotely (i.e., without removing the ceiling tiles), (2) a computer-driven diagnostic and improvement-tracking tool for residential duct installations, and (3) an integrated diagnosis verification and customer satisfaction system utilizing a combined computer/human expert system for HVAC performance. Prior to this work the aerosol-sealing technology was virtually untested in the light commercial sector--mostly because the savings potential and practicality of this or any other type of duct sealing had not been documented. Based upon the field experiences of PEG and Aeroseal, the overall product was tailored to suit the skill sets of typical HVAC-contractor personnel.

  14. Ceilings and Attics: Install Insulation and Provide Ventilation

    SciTech Connect (OSTI)

    2000-02-01

    This document provides guidelines for installing insulation and managing ventilation through your attic.

  15. NREL Job Task Analysis: Retrofit Installer Technician (Revised) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Retrofit Installer Technician (Revised) NREL Job Task Analysis: Retrofit Installer Technician (Revised) A summary of job task analyses for the position of retrofit installer technician when conducting weatherization work on a residence. retrofit_installer_jta_04112012.pdf (518.38 KB) More Documents & Publications NREL Job Task Analysis: Retrofit Installer Technician NREL Job Task Analysis: Energy Auditor Training Self-Assessment

  16. Quadrennial Energy Review: First Installment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    First Installment Quadrennial Energy Review: First Installment Quadrennial Energy Review: First Installment TRANSFORMING U.S. ENERGY INFRASTRUCTURES IN A TIME OF RAPID CHANGE On April 21, 2015, the Quadrennial Energy Review (QER) Task Force released its first installment of the Quadrennial Energy Review report entitled, "Energy Transmission, Storage, and Distribution Infrastructure". The first installment of the QER examines how to modernize our nation's energy infrastructure to

  17. Quadrennial Energy Review: Second Installment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Second Installment Quadrennial Energy Review: Second Installment Quadrennial Energy Review: Second Installment AN INTEGRATED STUDY OF THE ELECTRICITY SYSTEM On April 21, 2015, the Quadrennial Energy Review (QER) Task Force released its first installment of the Quadrennial Energy Review report entitled, "Energy Transmission, Storage, and Distribution Infrastructure." Among the issues highlighted by the analysis in the first installment of the QER were the growing dependencies of all

  18. Alternative Fuels Data Center: Installing B20 Equipment

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Fuels & Vehicles » Biodiesel Printable Version Share this resource Send a link to Alternative Fuels Data Center: Installing B20 Equipment to someone by E-mail Share Alternative Fuels Data Center: Installing B20 Equipment on Facebook Tweet about Alternative Fuels Data Center: Installing B20 Equipment on Twitter Bookmark Alternative Fuels Data Center: Installing B20 Equipment on Google Bookmark Alternative Fuels Data Center: Installing B20 Equipment on Delicious Rank Alternative Fuels Data

  19. Installation of New Extended Facility in Progress

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 Installation of New Extended Facility in Progress In April 2002, the ARM extended facility near Seminole, Oklahoma, ceased operation after the leased land under it was sold to new owners. The facility's equipment was removed from the site and placed in storage while a search for a new location began. When a new site was found near Earlsboro, Oklahoma, the approval process for relocation was set in motion. Extended facility sites are instrumented to collect data on solar radiation and its

  20. Extra-Territorial Siting of Nuclear Installations

    SciTech Connect (OSTI)

    Shea, Thomas E.; Morris, Frederic A.

    2009-10-07

    Arrangements might be created for siting nuclear installations on land ceded by a host State for administration by an international or multinational organization. Such arrangements might prove useful in terms of resolving suspicions of proliferation in troubled areas of the world, or as a means to introduce nuclear activities into areas where political, financial or technical capabilities might otherwise make such activities unsound, or as a means to enable global solutions to be instituted for major nuclear concerns (e.g., spent fuel management). The paper examines practical matters associated with the legal and programmatic aspects of siting nuclear installations, including diplomatic/political frameworks, engaging competent industrial bodies, protection against seizure, regulation to ensure safety and security, waste management, and conditions related to the dissolution of the extra-territorial provisions as may be agreed as the host State(s) achieve the capabilities to own and operate the installations. The paper considers the potential for using such a mechanism across the spectrum of nuclear power activities, from mining to geological repositories for nuclear waste. The paper considers the non-proliferation dimensions associated with such arrangements, and the pros and cons affecting potential host States, technology vendor States, regional neighbors and the international community. It considers in brief potential applications in several locations today.

  1. Fast Company covers "Just Your Typical New Mexico Image Recognition...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fast Company covers "Just Your Typical New Mexico Image Recognition Startup Spun Off From A ... covers new technique that may make solar panel production less expensive The ...

  2. Drum ring removal/installation tool

    SciTech Connect (OSTI)

    Andrade, William Andrew

    2006-11-14

    A handheld tool, or a pair of such tools, such as for use in removing/installing a bolt-type clamping ring on a container barrel/drum, where the clamping ring has a pair of clamping ends each with a throughbore. Each tool has an elongated handle and an elongated lever arm transversely connected to one end of the handle. The lever arm is capable of being inserted into the throughbore of a selected clamping end and leveraged with the handle to exert a first moment on the selected clamping end. Each tool also has a second lever arm, such as a socket with an open-ended slot, which is suspended alongside the first lever arm. The second lever arm is capable of engaging the selected clamping end and being leveraged with the handle to exert a second moment which is orthogonal to the first moment. In this manner, the first and second moments operate to hold the selected clamping end fixed relative to the tool so that the selected clamping end may be controlled with the handle. The pair of clamping ends may also be simultaneously and independently controlled with the use of two handles/tools so as to contort the geometry of the drum clamping ring and enable its removal/installation.

  3. Energy Department Launches SunShot Prize Competition to Install...

    Energy Savers [EERE]

    Energy Department Launches SunShot Prize Competition to Install Solar Energy Systems at a Fraction of Today's Price Energy Department Launches SunShot Prize Competition to Install ...

  4. Home Solar Installations: Things to Consider | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Home Solar Installations: Things to Consider Home Solar Installations: Things to Consider May 29, 2013 - 3:18pm Addthis Home solar systems can save you energy and money. | Photo ...

  5. Energy Saving "Cool Roofs" Installed at Y-12 | National Nuclear...

    National Nuclear Security Administration (NNSA)

    Energy Saving "Cool Roofs" Installed at Y-12 October 17, 2012 The Y-12 National Security Complex has taken additional steps to reduce its energy costs by installing almost 100,000 ...

  6. Issue #3: HVAC Proper Installation Energy Savings: Over-Promising...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: HVAC Proper Installation Energy Savings: Over-Promising or Under-Delivering? Issue 3: HVAC Proper Installation Energy Savings: Over-Promising or Under-Delivering? What energy ...

  7. Home Solar Installations: Things to Consider | Department of...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Solar Installations: Things to Consider Home Solar Installations: Things to Consider May 29, 2013 - 3:18pm Addthis Home solar systems can save you energy and money. | Photo ...

  8. Pasadena Water and Power- Solar Power Installation Rebate

    Broader source: Energy.gov [DOE]

    Pasadena Water & Power (PWP) offers its electric customers a rebate for photovoltaic (PV) installations, with a goal of helping to fund the installation of 14 megawatts (MW) of solar power by...

  9. Net Zero Energy Military Installations: A Guide to Assessment...

    Energy Savers [EERE]

    Net Zero Energy Military Installations: A Guide to Assessment and Planning Net Zero Energy Military Installations: A Guide to Assessment and Planning In 2008, DoD and DOE defined a ...

  10. DoD Energy Innovation on Military Installations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DoD Energy Innovation on Military Installations November 5, 2014 Dr. James Galvin Program ... EW-201260 EW-201261 DoD Energy Use, FY 2013 Military Installation Energy Usage DoD ...

  11. NREL Job Task Analysis: Retrofit Installer Technician | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy NREL Job Task Analysis: Retrofit Installer Technician NREL Job Task Analysis: Retrofit Installer Technician A summary of job task analyses for the position of retrofit installer technician when conducting weatherization work on a residence. 51671.pdf (341.28 KB) More Documents & Publications NREL Job Task Analysis: Retrofit Installer Technician (Revised) NREL Job Task Analysis: Energy Auditor NREL Job Task Analysis: Quality Control Inspector

  12. NREL Job Task Analysis: Retrofit Installer Technician (Revised)

    SciTech Connect (OSTI)

    Kurnik, C.; Woodley, C.

    2012-04-01

    A summary of job task analyses for the position of retrofit installer technician when conducting weatherization work on a residence.

  13. Combined Heat And Power Installation Market Analysis | OpenEI...

    Open Energy Info (EERE)

    Combined Heat And Power Installation Market Analysis Home There are currently no posts in this category. Syndicate...

  14. Combined Heat And Power Installation Market Forecast | OpenEI...

    Open Energy Info (EERE)

    Combined Heat And Power Installation Market Forecast Home There are currently no posts in this category. Syndicate...

  15. Choosing and Installing Geothermal Heat Pumps | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Installing Geothermal Heat Pumps Choosing and Installing Geothermal Heat Pumps These geothermal heating and cooling units installed in the basement of a new home are tied to a complex array of underground coils to keep indoor temperatures comfortable. | Photo courtesy of ©iStockphoto/BanksPhotos These geothermal heating and cooling units installed in the basement of a new home are tied to a complex array of underground coils to keep indoor temperatures comfortable. | Photo courtesy of

  16. PV Installation Labor Market Analysis and PV JEDI Tool Developments (Presentation)

    SciTech Connect (OSTI)

    Friedman, B.

    2012-06-01

    The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

  17. Experiences from the offshore installation of a composite materials firewater system

    SciTech Connect (OSTI)

    Ciaraldi, S.W.

    1993-12-31

    A prototype 300 m composite dry deluge firewater system was installed in December 1991 at the Valhall Field in the southern North Sea Norwegian offshore sector. This installation followed successful safety verification of the explosion and fire resistant design concept consisting of glass-fiber reinforced epoxy (GRE) piping components protected with a reinforced intumescent epoxy fire insulation. The installation was based primarily on the use of prefabricated GRE piping spools and fire insulation cast onto the piping or applied in the form of cast half shells. Significant experiences gained from the project are described. These experiences involve pre-engineering activities, detailed engineering, onshore fabrication, shipping, offshore hook-up, quality assurance, safety and economics. Although the overall installation was successful and the system is functioning as intended, areas of possible optimization and cost reduction for future composite firewater systems were identified. These findings are also briefly reviewed.

  18. Design and construction of liquefied petroleum gas installations (LPG)

    SciTech Connect (OSTI)

    Not Available

    1989-01-01

    This standard applies principally to both refrigerated and non-refrigerated installations that are larger in size than or closely associated with operating units, or both. The more complex problems presented by such installations require wider latitude for the designer than installations that are covered by the present National Fire Protection Association standards.

  19. Gearbox Typical Failure Modes, Detection, and Mitigation Methods (Presentation)

    SciTech Connect (OSTI)

    Sheng, S.

    2014-01-01

    This presentation was given at the AWEA Operations & Maintenance and Safety Seminar and focused on what the typical gearbox failure modes are, how to detect them using detection techniques, and strategies that help mitigate these failures.

  20. Field Testing of Thermoplastic Encapsulants in High-Temperature Installations

    SciTech Connect (OSTI)

    Kempe, Michael D.; Miller, David C.; Wohlgemuth, John H.; Kurtz, Sarah R.; Moseley, John M.; Shah, Qurat A.; Tamizhmani, Govindasamy; Sakurai, Keiichiro; Inoue, Masanao; Doi, Takuya; Masuda, Atsushi; Samuels, Sam L.; Vanderpan, Crystal E.

    2015-11-01

    Recently there has been increased interest in using thermoplastic encapsulant materials in photovoltaic modules, but concerns have been raised about whether these would be mechanically stable at high temperatures in the field. This has become a significant topic of discussion in the development of IEC 61730 and IEC 61215. We constructed eight pairs of crystalline-silicon modules and eight pairs of glass/encapsulation/glass thin-film mock modules using different encapsulant materials, of which only two were formulated to chemically crosslink. One module set was exposed outdoors with thermal insulation on the back side in Mesa, Arizona, in the summer (hot-dry), and an identical module set was exposed in environmental chambers. High-precision creep measurements (±20 Όm) and electrical performance measurements indicate that despite many of these polymeric materials operating in the melt or rubbery state during outdoor deployment, no significant creep was seen because of their high viscosity, lower operating temperature at the edges, and/or the formation of chemical crosslinks in many of the encapsulants with age despite the absence of a crosslinking agent. Only an ethylene-vinyl acetate (EVA) encapsulant formulated without a peroxide crosslinking agent crept significantly. When the crystalline-silicon modules, the physical restraint of the backsheet reduced creep further and was not detectable even for the EVA without peroxide. Because of the propensity of some polymeric materials to crosslink as they age, typical thermoplastic encapsulants would be unlikely to result in creep in the vast majority of installations.

  1. Case studies of six high priority DOD installations

    SciTech Connect (OSTI)

    1994-11-01

    This is a supplement to the report entitled Environmental Cleanup: Too Many High Priority Sites Impede DOD`s Program. It provides six installation case studies addressing issues including the status of the restoration program, the cost of cleanup to date and projected costs, the cleanup options considered, the option selected, expected completion, and the applicable cleanup standards. The case studies also provide installation specific information on reasons installation was listed on the NPL, the regulatory process, cooperation between the installation and the regulatory agencies, staffing at the installations and the regulatory agencies, and the process for funding the cleanup.

  2. Alstom 3-MW Wind Turbine Installed at NWTC (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2011-09-01

    The 3-MW Alstom wind turbine was installed at NREL's NWTC in October 2010. Test data will be used to validate advanced turbine design and analysis tools. NREL signed a Cooperative Research and Development Agreement with Alstom in 2010 to conduct certification testing on the company's 3-MW ECO 100 wind turbine and to validate models of Alstom's unique drivetrain concept. The turbine was installed at NREL's National Wind Technology Center (NWTC) in October 2010 and engineers began certification testing in 2011. Tests to be conducted by NREL include a power quality test to finalize the International Electrotechnical Commission (IEC) requirements for type certification of the 60-Hz unit. The successful outcome of this test will enable Alstom to begin commercial production of ECO 100 in the United States. NREL also will obtain additional measurements of power performance, acoustic noise, and system frequency to complement the 50 Hz results previously completed in Europe. After NREL completes the certification testing on the ECO 100, it will conduct long-term testing to validate gearbox performance to gain a better understanding of the machine's unique ALSTOM PURE TORQUE{trademark} drivetrain concept. In conventional wind turbines, the rotor is supported by the shaft-bearing gearbox assembly. Rotor loads are partially transmitted to the gearbox and may reduce gearbox reliability. In the ALSTOM PURE TORQUE concept, the rotor is supported by a cast frame running through the hub, which transfers bending loads directly to the tower. Torque is transmitted to the shaft through an elastic coupling at the front of the hub. According to Alstom, this system will increase wind turbine reliability and reduce operation and maintenance costs by isolating the gearbox from rotor loads. Gearbox reliability has challenged the wind energy industry for more than two decades. Gearbox failures require expensive and time-consuming replacement, significantly increasing the cost of wind plant

  3. Biased insert for installing data transmission components in downhole drilling pipe

    DOE Patents [OSTI]

    Hall, David R.; Briscoe, Michael A.; Garner, Kory K.; Wilde, Tyson J.

    2007-04-10

    An apparatus for installing data transmission hardware in downhole tools includes an insert insertable into the box end or pin end of drill tool, such as a section of drill pipe. The insert typically includes a mount portion and a slide portion. A data transmission element is mounted in the slide portion of the insert. A biasing element is installed between the mount portion and the slide portion and is configured to create a bias between the slide portion and the mount portion. This biasing element is configured to compensate for varying tolerances encountered in different types of downhole tools. In selected embodiments, the biasing element is an elastomeric material, a spring, compressed gas, or a combination thereof.

  4. Safeguards-by-Design: Guidance for Independent Spent Fuel Dry Storage Installations (ISFSI)

    SciTech Connect (OSTI)

    Trond Bjornard; Philip C. Durst

    2012-05-01

    This document summarizes the requirements and best practices for implementing international nuclear safeguards at independent spent fuel storage installations (ISFSIs), also known as Away-from- Reactor (AFR) storage facilities. These installations may provide wet or dry storage of spent fuel, although the safeguards guidance herein focuses on dry storage facilities. In principle, the safeguards guidance applies to both wet and dry storage. The reason for focusing on dry independent spent fuel storage installations is that this is one of the fastest growing nuclear installations worldwide. Independent spent fuel storage installations are typically outside of the safeguards nuclear material balance area (MBA) of the reactor. They may be located on the reactor site, but are generally considered by the International Atomic Energy Agency (IAEA) and the State Regulator/SSAC to be a separate facility. The need for this guidance is becoming increasingly urgent as more and more nuclear power plants move their spent fuel from resident spent fuel ponds to independent spent fuel storage installations. The safeguards requirements and best practices described herein are also relevant to the design and construction of regional independent spent fuel storage installations that nuclear power plant operators are starting to consider in the absence of a national long-term geological spent fuel repository. The following document has been prepared in support of two of the three foundational pillars for implementing Safeguards-by-Design (SBD). These are: i) defining the relevant safeguards requirements, and ii) defining the best practices for meeting the requirements. This document was prepared with the design of the latest independent dry spent fuel storage installations in mind and was prepared specifically as an aid for designers of commercial nuclear facilities to help them understand the relevant international requirements that follow from a country’s safeguards agreement with the

  5. CFPL installs products pipeline with directional drilling

    SciTech Connect (OSTI)

    1996-01-01

    Central Florida Pipeline Company (CFPL), a subsidiary of GATX Terminals Corp., Tampa, FL, has used directional drilling under seven water bodies in Hillsborough, Polk and Osceola Counties in constructing its new pipeline from Tampa to Orlando. Primary reason for using directional drilling is to protect the environment by minimizing water turbidity while the 16-inch diameter, 109-mile refined petroleum products pipeline is being installed. Total cost of the project is pegged at $68.5 million. Directional drilling enabled the pipe to be placed about 20 feet below the bottom of: The Alafia River in Riverview with 999 feet drilled; Port Sutton Channel near the Port of Tampa with 2,756 feet drilled; Reedy Creek Swamp at the intersection of Interstate 4 and Highway 192 which had 1,111 feet drilled; Wetland {number_sign}70 southwest of Lake Wales with 1,575 feet drilled; Peace River south of Bartow had 2,470 feet drilled; Bonnet Creek west of Kissimmee had 693 feet drilled. Shingle Creek near the borders of Osceola and Orange Counties with 1,700 feet drilled. This paper reviews the design plans for construction and the emergency response plans should a rupture occur in the line.

  6. Gasket and snap ring installation tool

    DOE Patents [OSTI]

    Southerland, Jr., James M.; Barringer, Jr., Curtis N.

    1994-01-01

    A tool for installing a gasket and a snap ring including a shaft, a first plate attached to the forward end of the shaft, a second plate slidably carried by the shaft, a spring disposed about the shaft between the first and second plates, and a sleeve that is free to slide over the shaft and engage the second plate. The first plate has a loading surface with a loading groove for receiving a snap ring and a shoulder for holding a gasket. A plurality of openings are formed through the first plate, communicating with the loading groove and approximately equally spaced about the groove. A plurality of rods are attached to the second plate, each rod slidable in one of the openings. In use, the loaded tool is inserted into a hollow pipe or pipe fitting having an internal flange and an internal seating groove, such that the gasket is positioned against the flange and the ring is in the approximate plane of the seating groove. The sleeve is pushed against the second plate, sliding the second plate towards the first plate, compressing the spring and sliding the rods forwards in the openings. The rods engage the snap ring and urge the ring from the loading groove into the seating groove.

  7. Production Facility Prototype Blower Installation Report

    SciTech Connect (OSTI)

    Woloshun, Keith Albert; Dale, Gregory E.; Dalmas, Dale Allen; Romero, Frank Patrick

    2015-07-28

    The roots blower in use at ANL for in-beam experiments and also at LANL for flow tests was sized for 12 mm diameter disks and significantly less beam heating.  Currently, the disks are 29 mm in diameter, with a 12 mm FWHM Gaussian beam spot at 42 MeV and 2.86 ΌA on each side of the target, 5.72 ΌA total. The target design itself is reported elsewhere.  With the increased beam heating, the helium flow requirement increased so that a larger blower was need for a mass flow rate of 400 g/s at 2.76 MPa (400 psig).  An Aerzen GM 12.4 blower was selected, and is currently being installed at the LANL facility for target and component flow testing.  This report describes this blower/motor/ppressure vessel package and the status of the facility preparations.

  8. Monte Carlo Simulation Tool Installation and Operation Guide

    SciTech Connect (OSTI)

    Aguayo Navarrete, Estanislao; Ankney, Austin S.; Berguson, Timothy J.; Kouzes, Richard T.; Orrell, John L.; Troy, Meredith D.; Wiseman, Clinton G.

    2013-09-02

    This document provides information on software and procedures for Monte Carlo simulations based on the Geant4 toolkit, the ROOT data analysis software and the CRY cosmic ray library. These tools have been chosen for its application to shield design and activation studies as part of the simulation task for the Majorana Collaboration. This document includes instructions for installation, operation and modification of the simulation code in a high cyber-security computing environment, such as the Pacific Northwest National Laboratory network. It is intended as a living document, and will be periodically updated. It is a starting point for information collection by an experimenter, and is not the definitive source. Users should consult with one of the authors for guidance on how to find the most current information for their needs.

  9. New Optical Fiber Network Being Installed at Lab to Expand Capacity...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Optical Fiber Network Being Installed at Lab to Expand Capacity Speed of New Optical Fiber Network Being Installed New Optical Fiber Network Being Installed at Lab to Expand ...

  10. Tracking the Sun VIII: The Installed Price of Residential and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Non-Residential Photovoltaic Systems in the United States | Department of Energy Tracking the Sun VIII: The Installed Price of Residential and Non-Residential Photovoltaic Systems in the United States Tracking the Sun VIII: The Installed Price of Residential and Non-Residential Photovoltaic Systems in the United States Now in its eighth edition, Lawrence Berkeley National Laboratory (LBNL)'s Tracking the Sun report series is dedicated to summarizing trends in the installed price of

  11. Better Buildings Neighborhood Program Data Installed Measures | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Installed Measures Better Buildings Neighborhood Program Data Installed Measures Building project data for 75,110 single-family homes upgraded between July 1, 2010, and September 30, 2013, are available. Reported data for some elements have been transformed, and to protect privacy, data for some upgraded homes have been omitted. BBNP Installed Measures (12.16 MB) More Documents & Publications Better Buildings Neighborhood Program Data Documentation DOE Zero Energy Ready Home

  12. Energy Secretary Chu Announces Five Million Smart Meters Installed

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nationwide as Part of Grid Modernization Effort | Department of Energy Five Million Smart Meters Installed Nationwide as Part of Grid Modernization Effort Energy Secretary Chu Announces Five Million Smart Meters Installed Nationwide as Part of Grid Modernization Effort June 13, 2011 - 12:00am Addthis Washington, DC - At a White House Grid Modernization event today, U.S. Department of Energy Secretary Steven Chu announced that more than five million smart meters have been installed nationwide

  13. Installation of Cool Roofs on Department of Energy Buildings | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Installation of Cool Roofs on Department of Energy Buildings Installation of Cool Roofs on Department of Energy Buildings 2010.06.01 S-1 memo, Installation of Cool Roofs on DOE Buildings.pdf (388.81 KB) More Documents & Publications Guidelines for Selecting Cool Roofs CX-002735: Categorical Exclusion Determination Impact of Solar PV Laminate Membrane Systems on Roofs

  14. Secretary Chu Announces Two Million Smart Grid Meters Installed Nationwide

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Million Smart Grid Meters Installed Nationwide Secretary Chu Announces Two Million Smart Grid Meters Installed Nationwide August 31, 2010 - 12:00am Addthis Columbus, OH - At an event today at Battelle headquarters in Columbus, Ohio, U.S. Energy Secretary Steven Chu announced that two million smart grid meters have been installed across the country, helping to reduce energy costs for families and businesses. As a result of funding from the Recovery Act, smart grid

  15. Weatherization Installer/Technician Fundamentals 2.0 - Moisture Barriers |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Moisture Barriers Weatherization Installer/Technician Fundamentals 2.0 - Moisture Barriers Moisture Barriers - Complete (2.34 MB) Lesson Plan: Moisture Barriers (107.22 KB) PowerPoint: Moisture Barriers (2.31 MB) More Documents & Publications Energy Auditor - Single Family 2.0: Moisture Assessment Weatherization Installer/Technician Fundamentals 2.0 - Roofing, Flashing, and Attic Ventilation Installation Needs Energy Auditor - Single Family 2.0: Building Shell

  16. Energy Department Completes Cool Roof Installation on DC Headquarters

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building to Save Money by Saving Energy | Department of Energy Completes Cool Roof Installation on DC Headquarters Building to Save Money by Saving Energy Energy Department Completes Cool Roof Installation on DC Headquarters Building to Save Money by Saving Energy December 14, 2010 - 12:00am Addthis Washington - Secretary Steven Chu today announced the completion of a new cool roof installation on the Department of Energy's Headquarters West Building. There was no incremental cost to adding

  17. PNNL Reports Distributed Wind Installations Down, Exports Up in 2013 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Reports Distributed Wind Installations Down, Exports Up in 2013 PNNL Reports Distributed Wind Installations Down, Exports Up in 2013 March 31, 2014 - 11:14am Addthis According to the second annual Market Report on Wind Technologies in Distributed Applications soon to be published by DOE's Pacific Northwest National Laboratory, U.S. wind turbines in distributed applications reached a cumulative installed capacity of 842 MW at the end of 2013, reflecting nearly 72,000

  18. Floodplain Assessment for Installation of a Renewable Energy Anaerobic

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Digester Facility | Department of Energy for Installation of a Renewable Energy Anaerobic Digester Facility Floodplain Assessment for Installation of a Renewable Energy Anaerobic Digester Facility Floodplain Assessment for Installation of a Renewable Energy Anaerobic Digester Facility at the University of California, Davis in Yolo County, California, as posted on the U.S. Department of Energy website. Floodplain Assessment (449.94 KB) More Documents & Publications Floodplain Assessment

  19. Installing and Maintaining a Home Solar Electric System | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Home Solar Electric System Installing and Maintaining a Home Solar Electric System When choosing a contractor, ask about their work record, experience, and licenses, and get more than one bid for the installation of your PV system. | Photo courtesy of Dennis Schroeder, NREL. When choosing a contractor, ask about their work record, experience, and licenses, and get more than one bid for the installation of your PV system. | Photo courtesy of Dennis Schroeder, NREL. Making sure your

  20. Workplace Charging Challenge: Install and Manage PEV Charging | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Install and Manage PEV Charging Workplace Charging Challenge: Install and Manage PEV Charging pev_workplace_charging_hosts_150x194.jpg To determine if workplace charging is right for your organization, use the employer resources to learn more about PEVs and charging stations. The PEV Handbook for Workplace Charging Hosts is particularly helpful for employers deciding if and how to install charging stations to ensure a successful workplace charging program. PEVs and Charging

  1. Install Removable Insulation on Valves and Fittings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Removable Insulation on Valves and Fittings Install Removable Insulation on Valves and Fittings This tip sheet on installing removable insulation on valves and fittings provides how-to advice for improving steam systems using low-cost, proven practices and technologies. STEAM TIP SHEET #17 Install Removable Insulation on Valves and Fittings (January 2012) (400.95 KB) More Documents & Publications Insulate Steam Distribution and Condensate Return Lines Improving Steam System Performance: A

  2. Install an Automatic Blowdown-Control System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    an Automatic Blowdown-Control System Install an Automatic Blowdown-Control System This steam tip sheet on installing automatic blowdown controls provide how-to advice for improving industrial steam systems using low-cost, proven practices and technologies. STEAM TIP SHEET #23 Install an Automatic Blowdown-Control System (January 2012) (408.53 KB) More Documents & Publications Minimize Boiler Blowdown Recover Heat from Boiler Blowdown Improving Steam System Performance: A Sourcebook for

  3. Building Life Cycle Cost Programs Software Installation Troubleshooting |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Software Installation Troubleshooting Building Life Cycle Cost Programs Software Installation Troubleshooting Having trouble downloading the Building Life Cycle Cost (BLCC) Programs software? Macintosh Operating Systems If you are receiving the "Download.app is damaged and can't be opened" error message when you attempt to install the BLCC software on your Macintosh operating system, visit the Tech Recipes website for instruction on how to change your security

  4. Quadrennial Energy Review Second Installment Electricity: Generation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... market may elect either rate-based or mass-based ... power producer in the United States, soon upon completion of ... can create the preverbal death spiral where one Band-Aid ...

  5. Spain Installed Wind Capacity Website | Open Energy Information

    Open Energy Info (EERE)

    URI: cleanenergysolutions.orgcontentspain-installed-wind-capacity-website Language: English Policies: Regulations Regulations: Feed-in Tariffs This website presents an...

  6. Installer Issues: Integrating Distributed Wind into Local Communities (Presentation)

    SciTech Connect (OSTI)

    Green, J.

    2006-06-01

    A presentation for the WindPower 2006 Conference in Pittsburgh, PA, regarding the issues facing installer of small wind electric systems.

  7. Departments of Energy, Defense Partner to Install Fuel Cell Backup...

    Energy Savers [EERE]

    Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military ... The primary challenge facing currently available fuel cells is the higher first cost ...

  8. DOE-DOD Emergency Backup Power Fuel Cell Installations

    SciTech Connect (OSTI)

    Fuel Cell Technologies Program

    2012-06-01

    Ths fact sheet describes a collaboration between the departments of Energy and Defense to install and operate 18 fuel cell backup power systems across the United States.

  9. Helping Ensure High-Quality Installation of Solar Power Technologies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology Maximizes Taxpayer's Investment Mercer Island celebrates the 500th Solarize installation in the state of Washington with a ribbon cutting at the Auto-Spa car wash. ...

  10. Focus Series: Maine — Residential Direct Install Program

    Broader source: Energy.gov [DOE]

    Better Buildings Neighborhood Program Focus Series: Maine—Residential Direct Install Program: Residential Air Sealing Program Drives Maine Home Energy Savings Through the Roof.

  11. Oregon Construction/Installation Permit for Onsite Wastewater...

    Open Energy Info (EERE)

    ConstructionInstallation Permit for Onsite Wastewater Treatment System Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Oregon Construction...

  12. Design, Installation, and Field Verification of Integrated Active...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cogeneration Package, 2008 Design, Installation, and Field Verification of Integrated Active Desiccant Hybrid Rooftop Systems Combined with a Natural Gas Driven Cogeneration ...

  13. Permit for Charging Equipment Installation: Electric Vehicle Supply Equipment (EVSE)

    Broader source: Energy.gov [DOE]

    Jurisdiction's can use this template to develop a standard permit for residential charging stations that allows for quick, safe installation of EVSE.

  14. Floodplain Assessment for Installation of a Renewable Energy...

    Office of Environmental Management (EM)

    Floodplain Assessment for Installation of a Renewable Energy Anaerobic Digester Facility at the University of California, Davis in Yolo County, California, as posted on the U.S. ...

  15. Installing and Maintaining a Home Solar Electric System | Department...

    Energy Savers [EERE]

    Making sure your home solar electric or photovoltaic (PV) system is sized, sited, installed, and maintained correctly is essential for maximizing its energy performance. When...

  16. New England Breeze Solar and Wind Installers | Open Energy Information

    Open Energy Info (EERE)

    Greater Boston Area Sector: Renewable energy, Services, Solar, Wind energy Product: Solar Panel and Wind Turbine Installation Year Founded: 2006 Phone Number: 978-567-9463...

  17. Study Guide for Photovoltaic System Installers and Sample Examination...

    Broader source: Energy.gov (indexed) [DOE]

    This study guide presents some of the basic cognitive material that individuals who install and maintain PV systems should understand. This information is intended primarily as a ...

  18. Tracking the Sun VIII: The Installed Price of Residential and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Non-Residential Photovoltaic Systems in the United States Tracking the Sun VIII: The Installed Price of Residential and Non-Residential Photovoltaic Systems in the United ...

  19. Consider Installing High-Pressure Boilers with BackpressureTurbine...

    Broader source: Energy.gov (indexed) [DOE]

    with backpressure turbine-generators as part of optimized steam systems. STEAM TIP SHEET 22 Consider Installing High-Pressure Boilers with Backpressure Turbine-Generators (January ...

  20. Database (Report) of U.S. CHP Installations Incorporating Thermal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Storage (TES) andor Turbine Inlet Cooling (TIC), 2004 Database (Report) of U.S. CHP Installations Incorporating Thermal Energy Storage (TES) andor Turbine Inlet Cooling (TIC), ...

  1. Upcoming Funding Opportunity for Tower Manufacturing and Installation...

    Energy Savers [EERE]

    and Lower Cost of Energy" intends to support partnerships that lead to innovative designs and processes for wind turbine tower manufacturing and turbine system installation. ...

  2. Obama Administration Announces Plans to Install New Solar Panels...

    Broader source: Energy.gov (indexed) [DOE]

    on Environmental Quality. "By installing solar panels on arguably the most famous house in ... will help make solar energy cost-competitive with conventional ...

  3. Consider Installing Turbulators on Two- and Three-Pass Firetube...

    Broader source: Energy.gov (indexed) [DOE]

    steam systems. STEAM TIP SHEET 25 Consider Installing Turbulators on Two- and Three-Pass Firetube Boilers (January 2012) (373.54 KB) More Documents & Publications Clean Boiler ...

  4. Focus Series: Maine - Residential Direct Install Program | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Better Buildings Neighborhood Program Focus Series: Maine - Residential Direct Install Program: Residential Air Sealing Program Drives Maine Home Energy Savings Through the Roof. ...

  5. Building America Expert Meeting: Achieving the Best Installed...

    Energy Savers [EERE]

    the best installed efficiency for residential gas furnaces, explain how AFUE and ... America Best Practices Series Vol. 14: Energy Renovations - HVAC: A Guide for ...

  6. DOE-DOD Emergency Backup Power Fuel Cell Installations

    Fuel Cell Technologies Publication and Product Library (EERE)

    Ths fact sheet describes a collaboration between the departments of Energy and Defense to install and operate 18 fuel cell backup power systems across the United States.

  7. Global Solar Photovoltaic (PV) Installation Market to be Propelled...

    Open Energy Info (EERE)

    Global Solar Photovoltaic (PV) Installation Market to be Propelled by Greater Concerns over Carbon Footprint Home > Groups > Renewable Energy RFPs John55364's picture Submitted by...

  8. Electricity production and cooling energy savings from installation...

    Office of Scientific and Technical Information (OSTI)

    Electricity production and cooling energy savings from installation of a ... Citation Details In-Document Search Title: Electricity production and cooling energy ...

  9. Choosing and Installing Geothermal Heat Pumps | Department of...

    Energy Savers [EERE]

    When selecting and installing a geothermal heat pump, consider the heating and cooling ... Evaluating Your Site for a Geothermal Heat Pump Shallow ground temperatures are relatively ...

  10. H2-Assisted NOx Traps: Test Cell Results Vehicle Installations...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    H2-Assisted NOx Traps: Test Cell Results Vehicle Installations 2003 DEER Conference Presentation: ArvinMeritor 2003deercrane.pdf (630.37 KB) More Documents & Publications ...

  11. Electric Vehicle Grid Integration for Sustainable Military Installations (Presentation)

    SciTech Connect (OSTI)

    Simpson, M.

    2011-05-05

    This presentation discusses electric vehicle grid integration for sustainable military installations. Fort Carson Military Reservation in Colorado Springs is used as a case study.

  12. First Magnet Girder Installed in NSLS-II Storage Ring

    ScienceCinema (OSTI)

    Frank Lincoln

    2013-07-19

    Supervisor Frank Lincoln explains how the first magnet girder is installed in the storage ring of Brookhaven National Laboratory's National Synchrotron Light Source II (NSLS-II).

  13. Fact #893: October 5, 2015 Incentives for the Installation of...

    Broader source: Energy.gov (indexed) [DOE]

    vehicle supply equipment (EVSE), also known as an electric vehicle charging station. ... and municipalities to install fueling stations for alternative fuels. up to 500,000 NC ...

  14. NMDOT Application for Permit to Install Utility Facilities Within...

    Open Energy Info (EERE)

    windex.php?titleNMDOTApplicationforPermittoInstallUtilityFacilitiesWithinPublicROW&oldid816935" Feedback Contact needs updating Image needs updating Reference...

  15. Forest County Potawatomi Community Installation of Solar Photovoltaic...

    Broader source: Energy.gov (indexed) [DOE]

    Installation of Solar Photovoltaic Systems Presented by: Tansey Smith Sustainability ... THANK YOU QUESTIONS? Tansey Smith Sustainability Coordinator 5320 Wensaut Lane Crandon, ...

  16. Field Testing of Thermoplastic Encapsulants in High-Temperature Installations

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Kempe, Michael D.; Miller, David C.; Wohlgemuth, John H.; Kurtz, Sarah R.; Moseley, John M.; Shah, Qurat A.; Tamizhmani, Govindasamy; Sakurai, Keiichiro; Inoue, Masanao; Doi, Takuya; et al

    2015-11-01

    Recently there has been increased interest in using thermoplastic encapsulant materials in photovoltaic modules, but concerns have been raised about whether these would be mechanically stable at high temperatures in the field. This has become a significant topic of discussion in the development of IEC 61730 and IEC 61215. We constructed eight pairs of crystalline-silicon modules and eight pairs of glass/encapsulation/glass thin-film mock modules using different encapsulant materials, of which only two were formulated to chemically crosslink. One module set was exposed outdoors with thermal insulation on the back side in Mesa, Arizona, in the summer (hot-dry), and an identicalmore » module set was exposed in environmental chambers. High-precision creep measurements (±20 Όm) and electrical performance measurements indicate that despite many of these polymeric materials operating in the melt or rubbery state during outdoor deployment, no significant creep was seen because of their high viscosity, lower operating temperature at the edges, and/or the formation of chemical crosslinks in many of the encapsulants with age despite the absence of a crosslinking agent. Only an ethylene-vinyl acetate (EVA) encapsulant formulated without a peroxide crosslinking agent crept significantly. When the crystalline-silicon modules, the physical restraint of the backsheet reduced creep further and was not detectable even for the EVA without peroxide. Because of the propensity of some polymeric materials to crosslink as they age, typical thermoplastic encapsulants would be unlikely to result in creep in the vast majority of installations.« less

  17. Typical Oak Ridge cemesto houses and city bus | Y-12 National Security

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complex Typical Oak Ridge cemesto ... Typical Oak Ridge cemesto houses and city bus Typical Oak Ridge cemesto houses and city bus

  18. Electrical installations in oil shale mines. Open file report 21 Sep 81-13 Aug 83

    SciTech Connect (OSTI)

    Gillenwater, B.B.; Kline, R.J.; Paas, N.

    1983-08-01

    This report presents recommended guidelines and regulatory changes applicable to electrical installations in underground oil shale mines. These recommendations are based on information gathered from oil shale operators, government agencies, and other knowledgeable sources familiar with existing plans for mining systems and electrical installations, and on present understanding of the problems and hazards associated with oil shale mining. Additional discussions of specific electrical problems related to oil shale mining include ground fault current levels, permissible electric wheel motors, permissible batteries and electric starting systems, intrinsically safe instrumentation, and applicability of existing test standards.

  19. Targeting Net Zero Energy for Military Installations (Presentation)

    SciTech Connect (OSTI)

    Burman, K.

    2012-05-01

    Targeting Net Zero Energy for Military Installations in Kaneohe Bay, Hawaii. A net zero energy installation (NZEI) is one that produces as much energy from on-site renewable sources as it consumes. NZEI assessment provides a systematic approach to energy projects.

  20. Study Guide for Photovoltaic System Installers and Sample Examination Questions

    Office of Energy Efficiency and Renewable Energy (EERE)

    This study guide presents some of the basic cognitive material that individuals who install and maintain PV systems should understand. This information is intended primarily as a study guide to help better prepare for the NABCEP PV installer examination but does not provide all of the information needed for completing the certification examination.

  1. Template for installing photovoltaic panel assembly and method

    SciTech Connect (OSTI)

    Nicholson, R.D.; Kaake, S.A.F.; Smith, R.F.

    1990-03-13

    This patent describes a portable adjustable template for use in cooperation with an impact driver for installing in the ground an array of posts of a photovoltaic panel support assembly. It comprises: a rigid frame to be positioned horizontally and longitudinally on the ground, the frame having a reference end and a work end; post guides affixed to the frame work end at predetermined locations for positioning posts to be installed and guiding them into the ground during installation; clamping means for affixing the frame reference end to a previously installed post and aligning the frame therewith; guide rails affixed to the frame work end at predetermined locations. Each of the guide rails cooperating with a post guide to telescopically support a post while being driven into the ground; and a drive chuck having an impact end for engagement with the impact driver and a driving end for engagement with a post to be installed.

  2. Installed Geothermal Capacity | Open Energy Information

    Open Energy Info (EERE)

    Map of Geothermal Power Plants List of Geothermal Power Plants Throughout the world geothermal energy is looked at as a potential source of renewable base-load power. As of...

  3. A generalized window energy rating system for typical office buildings

    SciTech Connect (OSTI)

    Tian, Cheng; Chen, Tingyao; Yang, Hongxing; Chung, Tse-ming

    2010-07-15

    Detailed computer simulation programs require lengthy inputs, and cannot directly provide an insight to relationship between the window energy performance and the key window design parameters. Hence, several window energy rating systems (WERS) for residential houses and small buildings have been developed in different countries. Many studies showed that utilization of daylight through elaborate design and operation of windows leads to significant energy savings in both cooling and lighting in office buildings. However, the current WERSs do not consider daylighting effect, while most of daylighting analyses do not take into account the influence of convective and infiltration heat gains. Therefore, a generalized WERS for typical office buildings has been presented, which takes all primary influence factors into account. The model includes embodied and operation energy uses and savings by a window to fully reflect interactions among the influence parameters. Reference locations selected for artificial lighting and glare control in the current common simulation practice may cause uncompromised conflicts, which could result in over- or under-estimated energy performance. Widely used computer programs, DOE2 and ADELINE, for hourly daylighting and cooling simulations have their own weaknesses, which may result in unrealistic or inaccurate results. An approach is also presented for taking the advantages of the both programs and avoiding their weaknesses. The model and approach have been applied to a typical office building of Hong Kong as an example to demonstrate how a WERS in a particular location can be established and how well the model can work. The energy effect of window properties, window-to-wall ratio (WWR), building orientation and lighting control strategies have been analyzed, and can be indicated by the localized WERS. An application example also demonstrates that the algebraic WERS derived from simulation results can be easily used for the optimal design of

  4. Preliminary assessment report for Fort Custer Training Center, Installation 26035, Augusta, Michigan. Installation Restoration Program

    SciTech Connect (OSTI)

    Flaim, S.; Krokosz, M.

    1993-08-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Michigan Army National Guard property near Augusta, Michigan. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Fort Custer Training Center, phase I of the Department of Defense Installation Restoration Program. The environmentally significant operations associated with the property are (1) storage of hazardous materials and hazardous waste, (2) storage and dispensing of fuel, (3) washing of vehicles and equipment, and (4) weapons training ranges that may have accumulated lead.

  5. Preliminary assessment report for Camp Swift Military Reservation, Installation 48070, Bastrop County, Texas. Installation Restoration Program

    SciTech Connect (OSTI)

    Dennis, C.B.

    1993-08-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard property in Bastrop County, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Camp Swift property, the requirement of the Department of Defense Installation Restoration Program (IRP). The review of both historical and current practices at the property indicated that the activities at Camp Swift include no operations considered to have an adverse impact to the environment. The recommendation, therefore, is that no further IRP action is necessary at this property.

  6. Preliminary assessment report for Waiawa Gulch, Installation 15080, Pearl City, Oahu, Hawaii. Installation Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Hawaii Army National Guard (HIARNG) property near Pearl City, Oahu, Hawaii. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Waiawa Gulch property, phase I of the Department of Defense Installation Restoration Program (IRP).

  7. Preliminary assessment report for Fort Jacob F. Wolters, Installation 48555, Mineral Wells, Texas. Installation Restoration Program

    SciTech Connect (OSTI)

    Dennis, C.B.

    1993-08-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard (TXARNG) property near Mineral Wells, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Fort Wolters property, the requirement of the Department of Defense Installation Restoration Program.

  8. LBB evaluation for a typical Japanese PWR primary loop by using the US NRC approved methods

    SciTech Connect (OSTI)

    Swamy, S.A.; Bhowmick, D.C.; Prager, D.E.

    1997-04-01

    The regulatory requirements for postulated pipe ruptures have changed significantly since the first nuclear plants were designed. The Leak-Before-Break (LBB) methodology is now accepted as a technically justifiable approach for eliminating postulation of double-ended guillotine breaks (DEGB) in high energy piping systems. The previous pipe rupture design requirements for nuclear power plant applications are responsible for all the numerous and massive pipe whip restraints and jet shields installed for each plant. This results in significant plant congestion, increased labor costs and radiation dosage for normal maintenance and inspection. Also the restraints increase the probability of interference between the piping and supporting structures during plant heatup, thereby potentially impacting overall plant reliability. The LBB approach to eliminate postulating ruptures in high energy piping systems is a significant improvement to former regulatory methodologies, and therefore, the LBB approach to design is gaining worldwide acceptance. However, the methods and criteria for LBB evaluation depend upon the policy of individual country and significant effort continues towards accomplishing uniformity on a global basis. In this paper the historical development of the U.S. LBB criteria will be traced and the results of an LBB evaluation for a typical Japanese PWR primary loop applying U.S. NRC approved methods will be presented. In addition, another approach using the Japanese LBB criteria will be shown and compared with the U.S. criteria. The comparison will be highlighted in this paper with detailed discussion.

  9. Garden Banks 388 pipeline jumper testing and installation

    SciTech Connect (OSTI)

    Hale, J.R.; Davis, S.W.; Prescott, C.N.

    1995-12-31

    This paper describes practical aspects of the diverless jumper connection system used to connect Enserch`s two 12-inch pipelines to the subsea template in 2,110 feet water depth. The paper is a follow-on paper to OTC 7543 which describes engineering aspects of the same jumper system. Project costs, schedule, and details of the jumper testing and installation are discussed. Testing was performed to verify jumper design and installation operations. Offshore installation used two measurement methods for verification of jumper geometry.

  10. Installing and Maintaining a Small Wind Electric System | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Small Wind Electric System Installing and Maintaining a Small Wind Electric System Installing and Maintaining a Small Wind Electric System If you went through the planning steps to evaluate whether a small wind electric system will work at your location, you will already have a general idea about: The amount of wind at your site The zoning requirements and covenants in your area The economics, payback, and incentives of installing a wind system at your site. Now, it is time to look at

  11. DOE-DOD Emergency Backup Power Fuel Cell Installations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE-DOD Emergency Backup Power Fuel Cell Installations On July 19, 2011, the U.S. Department of Energy (DOE) announced that, as part of an interagency partnership with the U.S. Department of Defense (DOD) to strengthen American energy security and develop new clean energy technologies, DOE and DOD will collaborate on a project to install and operate 18 fuel cell backup power systems at eight defense installations across the country. The Departments will test how the fuel cells perform in real

  12. Predicting aerodynamic characteristic of typical wind turbine airfoils using CFD

    SciTech Connect (OSTI)

    Wolfe, W.P. [Sandia National Labs., Albuquerque, NM (United States); Ochs, S.S. [Iowa State Univ., Ames, IA (United States). Aerospace Engineering Dept.

    1997-09-01

    An investigation was conducted into the capabilities and accuracy of a representative computational fluid dynamics code to predict the flow field and aerodynamic characteristics of typical wind-turbine airfoils. Comparisons of the computed pressure and aerodynamic coefficients were made with wind tunnel data. This work highlights two areas in CFD that require further investigation and development in order to enable accurate numerical simulations of flow about current generation wind-turbine airfoils: transition prediction and turbulence modeling. The results show that the laminar-to turbulent transition point must be modeled correctly to get accurate simulations for attached flow. Calculations also show that the standard turbulence model used in most commercial CFD codes, the k-e model, is not appropriate at angles of attack with flow separation. 14 refs., 28 figs., 4 tabs.

  13. Final row of solar panels installed at Livermore | National Nuclear...

    National Nuclear Security Administration (NNSA)

    When complete, the 3.3 MW fixed-tilt solar photovoltaic facility will represent the largest DOENNSA purchase of solar energy from an onsite facility. Electrical installation will ...

  14. Rapid installation of numerical models in multiple parent codes

    SciTech Connect (OSTI)

    Brannon, R.M.; Wong, M.K.

    1996-10-01

    A set of``model interface guidelines``, called MIG, is offered as a means to more rapidly install numerical models (such as stress-strain laws) into any parent code (hydrocode, finite element code, etc.) without having to modify the model subroutines. The model developer (who creates the model package in compliance with the guidelines) specifies the model`s input and storage requirements in a standardized way. For portability, database management (such as saving user inputs and field variables) is handled by the parent code. To date, NUG has proved viable in beta installations of several diverse models in vectorized and parallel codes written in different computer languages. A NUG-compliant model can be installed in different codes without modifying the model`s subroutines. By maintaining one model for many codes, MIG facilitates code-to-code comparisons and reduces duplication of effort potentially reducing the cost of installing and sharing models.

  15. Final Report- Transforming PV installations toward dispatchable, schedulable energy solutions

    Office of Energy Efficiency and Renewable Energy (EERE)

    Awardee: AE Solar EnergyLocation: Bend, ORSubprogram: Systems IntegrationFunding Program: SEGIS-ACProject: Transforming PV installations toward dispatchable, schedulable energy solutionsPrincipal...

  16. Energy Department Completes Cool Roof Installation on DC Headquarters...

    Broader source: Energy.gov (indexed) [DOE]

    replacement project and it will save taxpayers 2,000 every year in building energy costs. ... As a result of the new cool roof installations on both buildings, taxpayers will save a ...

  17. Los Alamos Field Office Installs Additional Safety Measure to Drums

    Broader source: Energy.gov [DOE]

    LOS ALAMOS, N.M. – EM’s Los Alamos Field Office and contractor Los Alamos National Security, LLC (LANS) recently completed installation of high efficiency particulate air (HEPA) filtration systems to remediated nitrate salt (RNS) drums.

  18. ARRA Program Celebrates Milestone 600,000 Smart Meter Installations

    Broader source: Energy.gov [DOE]

    On April 11, 2012, DOE Recovery Act funding recipient Sacramento Municipal Utility District (SMUD) celebrated a major milestone in the development of a regional smart grid in California: the installation of over 600,000 smart meters.

  19. Rooftop Photovoltaic Systems Installed in New York City

    Broader source: Energy.gov [DOE]

    This photograph shows a rooftop system that was installed by Solar Energy Systems and funded by the U.S. Department of Energy through its Solar America Communities program. New York, one of the 25...

  20. Installing and Maintaining a Small Wind Electric System | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Deciding whether to connect the system to the electric grid or not. Installation and Maintenance The manufacturer of your wind system, or the dealer where you bought it, should be...

  1. Tracking the Sun VIII. The Installed Price of Residential and...

    Office of Scientific and Technical Information (OSTI)

    Tracking the Sun VIII. The Installed Price of Residential and Non-Residential Photovoltaic Systems in the United States Citation Details In-Document Search Title: Tracking the Sun ...

  2. Install and Automatic Blowdown Control System - Steam Tip Sheet #23

    SciTech Connect (OSTI)

    2012-01-01

    This revised AMO steam tip sheet on installing automatic blowdown controls provide how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  3. Offshore Wind Energy Market Installed Capacity is Anticipated...

    Open Energy Info (EERE)

    Offshore Wind Energy Market Installed Capacity is Anticipated to Reach 52,120.9 MW by 2022 Home > Groups > Renewable Energy RFPs Wayne31jan's picture Submitted by Wayne31jan(150)...

  4. NIPSCO Small Business Direct Install Electric and Natural Gas Program

    Broader source: Energy.gov [DOE]

    NIPSCO's Small Business Direct Install Program is designed to help small businesses minimize energy costs, and provides energy-saving CFL lighting, showerheads and faucet aerators at no added cost.

  5. Data Safer than Ever with FM-200 Installation

    Broader source: Energy.gov [DOE]

    The consolidated data center at the Legacy Management Business Center (LMBC) in Morgantown, West Virginia, is now guarded by a state-of-the-art FM-200Âź Fire Suppression System. Installation of the...

  6. Installing and Maintaining a Home Solar Electric System | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    a Home Solar Electric System When choosing a contractor, ask about their work record, experience, and licenses, and get more than one bid for the installation of your PV...

  7. DOE-DOD Emergency Backup Power Fuel Cell Installations | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Ths fact sheet describes a collaboration between the departments of Energy and Defense to install and operate 18 fuel cell backup power systems across the United States. DOE-DOD ...

  8. Income Tax Deduction for the Installation of Building Insulation

    Office of Energy Efficiency and Renewable Energy (EERE)

    A residential taxpayer is entitled to an Indiana income tax deduction on the materials and labor used to install insulation in a taxpayer’s principal place of residence in Indiana. 

  9. Integrated dynamic landscape analysis and modeling system (IDLAMS) : installation manual.

    SciTech Connect (OSTI)

    Li, Z.; Majerus, K. A.; Sundell, R. C.; Sydelko, P. J.; Vogt, M. C.

    1999-02-24

    The Integrated Dynamic Landscape Analysis and Modeling System (IDLAMS) is a prototype, integrated land management technology developed through a joint effort between Argonne National Laboratory (ANL) and the US Army Corps of Engineers Construction Engineering Research Laboratories (USACERL). Dr. Ronald C. Sundell, Ms. Pamela J. Sydelko, and Ms. Kimberly A. Majerus were the principal investigators (PIs) for this project. Dr. Zhian Li was the primary software developer. Dr. Jeffrey M. Keisler, Mr. Christopher M. Klaus, and Mr. Michael C. Vogt developed the decision analysis component of this project. It was developed with funding support from the Strategic Environmental Research and Development Program (SERDP), a land/environmental stewardship research program with participation from the US Department of Defense (DoD), the US Department of Energy (DOE), and the US Environmental Protection Agency (EPA). IDLAMS predicts land conditions (e.g., vegetation, wildlife habitats, and erosion status) by simulating changes in military land ecosystems for given training intensities and land management practices. It can be used by military land managers to help predict the future ecological condition for a given land use based on land management scenarios of various levels of training intensity. It also can be used as a tool to help land managers compare different land management practices and further determine a set of land management activities and prescriptions that best suit the needs of a specific military installation.

  10. NREL and Alstom Celebrate Wind Turbine Installation - News Releases | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NREL and Alstom Celebrate Wind Turbine Installation 3 MW, 60 Hz Alstom ECO 100 Now Fully Operational at National Wind Technology Center April 26, 2011 Golden, Colo., April 26, 2011 - Officials from the U.S. Department of Energy (DOE) and DOE's National Renewable Energy Laboratory (NREL), along with officials from Alstom, today commemorated the successful installation and full capacity operation of a 3 megawatt Alstom ECO 100 wind turbine at NREL's National Wind Technology Center. This event

  11. Permit for Charging Equipment Installation: Electric Vehicle Supply Equipment (EVSE)

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Compliance with the following permit will allow the installation and operation of electric vehicle charging equipment at a residence in the City, State jurisdiction. This permit addresses one of the following situations: Only an additional branch circuit would be added at the residence A hard-wired charging station would be installed at the residence. The attached requirements for wiring the charging station are taken directly out of the 2011 edition of the National Electrical Code (NEC) NFPA

  12. Consider Installing High-Pressure Boilers with Backpressure

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Turbine-Generators | Department of Energy High-Pressure Boilers with Backpressure Turbine-Generators Consider Installing High-Pressure Boilers with Backpressure Turbine-Generators This tip sheet outlines the benefits of high-pressure boilers with backpressure turbine-generators as part of optimized steam systems. STEAM TIP SHEET #22 Consider Installing High-Pressure Boilers with Backpressure Turbine-Generators (January 2012) (513.44 KB) More Documents & Publications Replace

  13. Energy Jobs: Electric Vehicle Charging Station Installer | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Electric Vehicle Charging Station Installer Energy Jobs: Electric Vehicle Charging Station Installer October 28, 2014 - 3:23pm Addthis As the demand for electric vehicles goes up, charging stations become more prevalent -- here an electric vehicle owner uses a local charging station. | Photo Courtesy of the Energy Department. As the demand for electric vehicles goes up, charging stations become more prevalent -- here an electric vehicle owner uses a local charging station. | Photo

  14. WIPP Installs Underground Personnel Notification and Tracking System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1, 2016 WIPP Installs Underground Personnel Notification and Tracking System A new underground Wireless Notification and Tracking System (WNTS) has been installed at the Waste Isolation Pilot Plant (WIPP) that allows for two-way communication for both talk and text, audible and flashing alarms and allows personnel to immediately signal the Central Monitoring Room (CMR) in the event of an emergency. It also provides real-time tracking of all personnel entering the WIPP underground. "I'm

  15. Nevada manufacturer installing geothermal power plant | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Nevada manufacturer installing geothermal power plant Nevada manufacturer installing geothermal power plant August 26, 2010 - 4:45pm Addthis Chemetall extracts lithium carbonate, a powder, from brine, a salty solution from within the earth. | Photo courtesy Chemetall Chemetall extracts lithium carbonate, a powder, from brine, a salty solution from within the earth. | Photo courtesy Chemetall Joshua DeLung Chemetall supplies materials for lithium-ion batteries for electric vehicles

  16. Spurring Solar Installations in Hawaii | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Spurring Solar Installations in Hawaii Spurring Solar Installations in Hawaii January 5, 2015 - 2:06pm Addthis National Renewable Energy Laboratory engineer Greg Martin (from left) works with Solectria engineers Jonathon Smith and Jihua Ma testing Solectria's smart inverter at the Energy Systems Integration Facility in Golden, Colorado. | Photo by Dennis Schroeder, National Renewable Energy Laboratory National Renewable Energy Laboratory engineer Greg Martin (from left) works with Solectria

  17. High-performance computer system installed at Los Alamos National

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory High-performance computer system installed at Lab High-performance computer system installed at Los Alamos National Laboratory New high-performance computer system, called Wolf, will be used for unclassified research. June 17, 2014 The Wolf computer system modernizes mid-tier resources for Los Alamos scientists. The Wolf computer system modernizes mid-tier resources for Los Alamos scientists. Contact Nancy Ambrosiano Communications Office (505) 667-0471 Email "This machine

  18. Solar, Wind, Hydropower: Home Renewable Energy Installations | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Solar, Wind, Hydropower: Home Renewable Energy Installations Solar, Wind, Hydropower: Home Renewable Energy Installations April 17, 2013 - 1:44pm Addthis This Lakewood, Colorado home was built in 1956. Brent and Mo Nelson upgraded the home with multiple solar technologies including; daylighting, passive solar and active solar. They also have an 80 gallon solar hot water heater. | Photo by Dennis Schroeder, National Renewable Energy Laboratory. This Lakewood, Colorado home was built

  19. High-performance computer system installed at Los Alamos National

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory High-performance computer system installed at Los Alamos National Laboratory Alumni Link: Opportunities, News and Resources for Former Employees Latest Issue:September 2015 all issues All Issues » submit High-performance computer system installed at Los Alamos National Laboratory New high-performance computer system, called Wolf, will be used for unclassified research September 2, 2014 New insights to changing the atomic structure of metals The Wolf computer system modernizes

  20. Patrice Turchi Installed as 2015 TMS President | Critical Materials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Institute Patrice Turchi Installed as 2015 TMS President mlthach's picture Submitted by mlthach on Tue, 03/31/2015 - 13:41 TMS installed Patrice Turchi as its 2015 President on March 17, 2015. Publish Date: Sunday, March 22, 2015 - 13:45 Article URL: http://www.newswise.com/articles/view/631506/?sc=rsla&utm_content=bufferf46a7&utm_medium=social&utm_source=twitter.com&utm_campaign=buffer Article Source: Newswise

  1. Upcoming Funding Opportunity for Tower Manufacturing and Installation |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Tower Manufacturing and Installation Upcoming Funding Opportunity for Tower Manufacturing and Installation December 18, 2013 - 11:25am Addthis The DOE Wind Program has issued a Notice of Intent for a funding opportunity that it intends to post early in 2014, pending Congressional appropriations. The funding opportunity, tentatively titled "U.S. Wind Manufacturing: Taller Hub Heights to Access Higher Wind Resources, and Lower Cost of Energy" intends to support

  2. SeaStar: Subsea cluster manifold system design and installation

    SciTech Connect (OSTI)

    Mason, P.G.T.; Upchurch, J.L.

    1996-12-31

    The SeaStar Cluster Manifold system was engineered as a low cost alternative to larger and more expensive completion template designs. Utilizing field-proven equipment and installation techniques, it was the first of its kind to be installed in the Gulf of Mexico. The Cluster Manifold system allows the connection of flowlines from adjacent satellite wells and numerous infield flowlines consisting of export, service, and methanol lines. With new technological advances, and a variety of flowline connection systems on the market today, deep water completions are being used with increasing frequency. Subsea operations are becoming more routine and installation times are being reduced. The SeaStar system was successfully installed in Garden Banks Block 70/71 in the Gulf of Mexico during the first quarter of 1995. Currently two 4 x 2-in. 10,000 psi lay-away trees are installed and connected to the manifold. Production is being processed at a Marathon platform in Vermilion Block 386B approximately 13.5 miles away from the subsea installation.

  3. Tracking the Sun IV: An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010

    SciTech Connect (OSTI)

    Darghouth, Naim; Wiser, Ryan

    2011-09-07

    The present report describes installed cost trends for grid-connected PV projects installed from 1998 through 2010 (with some limited and preliminary results presented for projects installed in the first six months of 2011). The analysis is based on project-level cost data from approximately 116,500 residential, non-residential, and utility-sector PV systems in the United States. The inclusion of utility-sector PV is a new element in this year’s report. The combined capacity of all systems in the data sample totals 1,685 MW, equal to 79% of all grid-connected PV capacity installed in the United States through 2010 and representing one of the most comprehensive sources of installed PV cost data for the U.S. Based on this dataset, the report describes historical installed cost trends over time, and by location, market segment, technology type, and component. The report also briefly compares recent PV installed costs in the United States to those in Germany and Japan, and describes trends in customer incentives for PV installations and net installed costs after receipt of such incentives. The analysis presented here focuses on descriptive trends in the underlying data, serving primarily to summarize the data in tabular and graphical form.

  4. Technical basis for installation of the double shell tank exhaust flow monitoring systems

    SciTech Connect (OSTI)

    Willingham, W.E., Fluor Daniel Hanford

    1997-03-11

    This document presents the technical bases for installation of flow meters on the ventilation exhaust ducts of the flammable gas watch list double shell tanks (241-AN-103, 241-AN-104, 241-AN-105, 241-AN-107, 241-AW-101 and 241-SY-103), the saltwell receiver tanks (241-AN-101 and 241-SY-102) and the cross-site receiver tank (241-AP-104).

  5. Fact #643: October 4, 2010 Four Cylinder Engine Installations Continue to

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rise | Department of Energy 3: October 4, 2010 Four Cylinder Engine Installations Continue to Rise Fact #643: October 4, 2010 Four Cylinder Engine Installations Continue to Rise The share of 4 cylinder engines installed in light vehicles has been increasing since 2004. Beginning in 2006, cars have shown an increase in 4 cylinder engine installations while 8 cylinder engine installations have declined during that same period. For light trucks, 6 and 8 cylinder engine installations have

  6. LANL installs high-performance computer system | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) LANL installs high-performance computer system Friday, June 20, 2014 - 10:29am Los Alamos National Laboratory recently installed a new high-performance computer system, called Wolf, which will be used for unclassified research. Wolf will help modernize mid-tier resources available to the lab and can be used to advance many fields of science. Wolf, manufactured by Cray Inc., has 616 compute nodes, each with two 8-core 2.6 GHz Intel "Sandybridge" processors,

  7. QER SECOND INSTALLMENT PUBLIC MEETING-ATLANTA, GEORGIA | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy ATLANTA, GEORGIA QER SECOND INSTALLMENT PUBLIC MEETING-ATLANTA, GEORGIA MEETING DATE AND LOCATION Tuesday, May 24, 2016 Doors open: 9:00 AM; Program begins: 10:00 AM Georgia Tech GTRI Conference Center 250 14th Street, NW Atlanta, Georgia 30318 Watch the May 24th Atlanta meeting here. MEETING INFORMATION The Quadrennial Energy Review Task Force will host a public stakeholder meeting on the second installment of the Quadrennial Energy Review (QER), an integrated study of the U.S.

  8. QER SECOND INSTALLMENT PUBLIC MEETING-LOS ANGELES, CALIFORNIA |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy LOS ANGELES, CALIFORNIA QER SECOND INSTALLMENT PUBLIC MEETING-LOS ANGELES, CALIFORNIA MEETING DATE AND LOCATION Tuesday, May 10, 2016 Doors open: 8:30 AM; Program begins: 9:00 AM Los Angeles City Hall Tom Bradley Tower Room 200 North Spring Street Los Angeles, CA 90012 Watch the May 10th Los Angeles regional meeting here. MEETING INFORMATION The Quadrennial Energy Review Task Force will host a public stakeholder meeting on the second installment of the Quadrennial Energy

  9. Solar heating system installed at Troy, Ohio. Final report

    SciTech Connect (OSTI)

    1980-09-01

    This document is the Final Report of the Solar Energy System located at Troy-Miami County Public Library, Troy, Ohio. The completed system is composed of tree basic subsystems: the collector system consisting of 3264 square feet of Owens Illinois evacuated glass tube collectors; the storage system which includes a 5000-gallon insulated steel tank; and the distribution and control system which includes piping, pumping and control logic for the efficient and safe operation of the entire system. This solar heating system was installed in an existing facility and is, therefore, a retrofit system. This report includes extracts from the site files, specifications, drawings, installation, operation and maintenance instructions.

  10. Waste-to-Energy Projects at Army Installations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste-to-Energy Projects at Army Waste to Energy Projects at Army Installations Mr. Franklin H. Holcomb Chief, Energy Branch U.S U.S. Army . Army ERDC ERDC- -CERL CERL Champaign IL USA Champaign IL USA p g p g 13 JAN 2011 13 JAN 2011 US Army Corps of Engineers BUILDING STRONG Âź Distribution Statement A -- Approved for public release; distribution is unlimited. Outline ƒ Background â–ș Intro to ERDC â–ș Army/DoD Energy Requirements & Objectives â–ș 2008 Installation WTE Workshop â–ș 2009

  11. EERE Success Story-Plug and Play: Purchase, Install, and Connect...

    Energy Savers [EERE]

    Plug and Play: Purchase, Install, and Connect Residential Solar Power in Hours EERE Success Story-Plug and Play: Purchase, Install, and Connect Residential Solar Power in Hours ...

  12. EERE Success Story-Helping Ensure High-Quality Installation of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Helping Ensure High-Quality Installation of Solar Power Technologies EERE Success Story-Helping Ensure High-Quality Installation of Solar Power Technologies April 15, 2013 - ...

  13. Assembly and installation of the large coil test facility test stand

    SciTech Connect (OSTI)

    Queen, C.C. Jr.

    1983-01-01

    The Large Coil Test Facility (LCTF) was built to test six tokamak-type superconducting coils, with three to be designed and built by US industrial teams and three provided by Japan, Switzerland, and Euratom under an international agreement. The facility is designed to test these coils in an environment which simulates that of a tokamak. The heart of this facility is the test stand, which is made up of four major assemblies: the Gravity Base Assembly, the Bucking Post Assembly, the Torque Ring Assembly, and the Pulse Coil Assembly. This paper provides a detailed review of the assembly and installation of the test stand components and the handling and installation of the first coil into the test stand.

  14. New 100 mm Gun Assembly Installation at Lawrence Livermore National Laboratory High Explosives Applications Facility

    SciTech Connect (OSTI)

    Vandersall, K S; Lee, R A; Chiao, P I; Garcia, F; Travis, J O; Forbes, J W

    2003-10-28

    A new 100mm gun assembly was recently installed and tested at Lawrence Livermore National Laboratories located in the High Explosives Applications Facility (HEAF). Thiot Ingenierie performed the design of the replacement barrel, based on improvements to the initial design. This design incorporated barrel and breech sections forged from CLARM series high-strength alloys obtained from Tecphy Corporation and machined by Manufacture de Forage. Part of the improvement of the design was implementing a laser alignment system for quick and accurate barrel alignment checks. This laser is also used to align the target assembly. This paper will detail the design changes incorporated into the installation, the testing process, and future direction of research for the new gun.

  15. An overview of the sustainability of solid waste management at military installations

    SciTech Connect (OSTI)

    Borglin, S.; Shore, J.; Worden, H.; Jain, R.

    2009-08-15

    Sustainable municipal solid waste management at military solutions necessitates a combined approach that includes waste reduction, alternative disposal techniques, and increased recycling. Military installations are unique because they often represent large employers in the region in which they are located, thereby making any practices they employ impact overall waste management strategies of the region. Solutions for waste sustainability will be dependent on operational directives and base location, availability of resources such as water and energy, and size of population. Presented in this paper are descriptions of available waste strategies that can be used to support sustainable waste management. Results presented indicate source reduction and recycling to be the most sustainable solutions. However, new waste-to-energy plants and composting have potential to improve on these well proven techniques and allow military installations to achieve sustainable waste management.

  16. Installation of the first Distributed Energy Storage System (DESS) at American Electric Power (AEP).

    SciTech Connect (OSTI)

    Nourai, Ali

    2007-06-01

    AEP studied the direct and indirect benefits, strengths, and weaknesses of distributed energy storage systems (DESS) and chose to transform its entire utility grid into a system that achieves optimal integration of both central and distributed energy assets. To that end, AEP installed the first NAS battery-based, energy storage system in North America. After one year of operation and testing, AEP has concluded that, although the initial costs of DESS are greater than conventional power solutions, the net benefits justify the AEP decision to create a grid of DESS with intelligent monitoring, communications, and control, in order to enable the utility grid of the future. This report details the site selection, construction, benefits and lessons learned of the first installation, at Chemical Station in North Charleston, WV.

  17. Vet’s company installing solar across Massachusetts

    Broader source: Energy.gov [DOE]

    Dan Leary, a U.S. Army veteran, is president of Nexamp Inc., a clean energy company that specializes in solar installation. Dan founded the company in 2006 and has witnessed its impressive growth from six employees to 65 and counting as of July 2010.

  18. Analysis of Bright Harvest Remote Analysis for Residential Solar Installations

    SciTech Connect (OSTI)

    Nangle, John; Simon, Joseph

    2015-06-17

    Bright Harvest provides remote shading analysis and design products for residential PV system installers. The National Renewable Energy Laboratory (NREL) through the NREL Commercialization Assistance Program, completed comparative assessments between on-site measurements and remotely calculated values to validate the accuracy of Bright Harvest’s remote shading and power generation.

  19. T-729: Mozilla Code Installation Through Holding Down Enter

    Broader source: Energy.gov [DOE]

    Attackers can exploit this issue by enticing an unsuspecting victim into viewing and interacting with a malicious Web page. An attacker may be able to exploit this issue to bypass a confirmation dialog and install an arbitrary add-on. This may aid in further attacks.

  20. Workers Continue Progress in Installing Equipment for Vitrification Facility

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – Workers recently completed installing two of the last major pieces of equipment for the EM Office of River Protection’s Low-Activity Waste (LAW) Vitrification Facility at the Hanford Site’s Waste Treatment and Immobilization Plant (WTP).

  1. Tracking the Sun VII: An Historical Summary of the Installed Price of Photovoltaics in the United States from 1998-2013

    Broader source: Energy.gov [DOE]

    As the deployment of grid-connected solar photovoltaic (PV) systems has increased, so too has the desire to track the cost and price of these systems. This report helps fill this need by summarizing trends in the installed price of grid-connected PV systems in the United States from 1998 through 2013, with partial data for the first half of 2014. The analysis is based on project level data for more than 300,000 individual residential, commercial, and utility-scale PV systems installed across 33 states, representing 80% of all grid-connected PV capacity installed in the United States through 2013. Researchers found that installed prices continued declining in 2013, falling year-over-year by $0.7/W, or 12-15% depending on system size range, and data for the first six months of 2014 indicate that installed prices have continued to fall. This recorded decline since 2008 is largely attributable to module price reductions.

  2. EA-1655: Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition, Installation and Use for Research and Development

    Broader source: Energy.gov [DOE]

    Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition, Installation and Use for Research and Development

  3. Median Installed Price of U.S. Solar at All-Time Low in 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Median Installed Price of U.S. Solar at All-Time Low in 2015

  4. Evaluation of Aqua-Ammonia Chiller Technologies and Field Site Installation

    SciTech Connect (OSTI)

    Zaltash, Abdolreza

    2007-09-01

    The Naval Facilities Engineering Service Center (NFESC) has sponsored Oak Ridge National Laboratory (ORNL) to review, select, and evaluate advanced, gas-fired, 5-ton, aqua-ammonia, chiller technologies. The selection criteria was that units have COP values of 0.67 or better at Air-conditioning and Refrigeration Institute (ARI) 95 F outdoor rating conditions, an active refrigerant flow control, and a variable-speed condenser fan. These features are expected to allow these units to operate at higher ambient temperatures (up to the maximum operating temperature of 110 F) with minimal degradation in performance. ORNL evaluated three potential manufacturers of advanced, gas-fired, 5-ton, aqua-ammonia chillers-Robur, Ambian, and Cooling Technologies. Unfortunately, Robur did not meet the COP requirements and Cooling Technologies could not deliver a unit to be tested at the U.S. Department of Energy (DOE)-ORNL environmental chamber testing facility for thermally activated heat pumps. This eliminated these two technologies from further consideration, leaving only the Ambian chillers for evaluation. Two Ambian chillers were evaluated at the DOE-ORNL test facility. Overall these chillers operated well over a wide range of ambient conditions with minimal degradation in performance due to several control strategies used such as a variable speed condenser fan, a modulating burner, and active refrigerant flow control. These Ambian pre-commercial units were selected for installation and field testing at three federal facilities. NFESC worked with ORNL to assist with the site selection for installation and evaluation of these chillers. Two sites (ORNL and Naval Surface Warfare Center [NSWC] Corona) had a single chiller unit installed; and at one site (Naval Amphibious Base [NAB] Little Creek), two 5-ton chillers linked together were installed to provide 10 tons of cooling. A chiller link controller developed under this project was evaluated in the field test at Little Creek.

  5. Safety assessment of discharge chute isolation barrier preparation and installation

    SciTech Connect (OSTI)

    Meichle, R.H.

    1994-10-21

    This analysis examines activities associated with the installation of isolation barriers in the K Basins at the Hanford Reservation. This revision adds evaluation of barrier drops on stored fuel and basin floor, identifies fuel which will be moved and addresses criticality issues with sludge. The safety assessment is made for the activities for the preparation and installation of the discharge chute isolation barriers. The safety assessment includes a hazard assessment and comparisons of potential accidents/events to those addressed by the current safety basis documentation. No significant hazards were identified. An evaluation against the USQ evaluation questions was made and the determination made that the activities do not represent a USQ. Hazard categorization techniques were used to provide a basis for readiness review classifications.

  6. Idaho National Engineering Laboratory installation roadmap document. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1993-05-30

    The roadmapping process was initiated by the US Department of Energy`s office of Environmental Restoration and Waste Management (EM) to improve its Five-Year Plan and budget allocation process. Roadmap documents will provide the technical baseline for this planning process and help EM develop more effective strategies and program plans for achieving its long-term goals. This document is a composite of roadmap assumptions and issues developed for the Idaho National Engineering Laboratory (INEL) by US Department of Energy Idaho Field Office and subcontractor personnel. The installation roadmap discusses activities, issues, and installation commitments that affect waste management and environmental restoration activities at the INEL. The High-Level Waste, Land Disposal Restriction, and Environmental Restoration Roadmaps are also included.

  7. Solar heating system installed at Jackson, Tennessee. Final report

    SciTech Connect (OSTI)

    1980-10-01

    The solar energy heating system installed at the Coca-Cola Bottling Works in Jackson, Tennessee is described. The system consists of 9480 square feet of Owens-Illinois evacuated tubular solar collectors with attached specular cylindrical reflectors and will provide space heating for the 70,000 square foot production building in the winter, and hot water for the bottle washing equipment the remainder of the year. Component specifications and engineering drawings are included. (WHK)

  8. Safety assessment of discharge chute isolation barrier preparation and installation

    SciTech Connect (OSTI)

    Meichle, R.H.

    1994-09-29

    The safety assessment is made for the activities for the preparation and installation of the discharge chute isolation barriers. The safety assessment includes a hazard assessment and comparison of potential accidents/events to those addressed by the current safety basis documentation. No significant hazards were identified. An evaluation against the USQ evaluation questions were made and the determination made that the activities do not represent a USQ. Hazard categorization techniques were used to provide a basis for readiness review classification.

  9. Summary: The First Installment of the Quadrennial Energy Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Summary: The First Installment of the Quadrennial Energy Review S-36 QER Report: Energy Transmission, Storage, and Distribution Infrastructure | April 2015 QER Report: Energy Transmission, Storage, and Distribution Infrastructure | April 2015 1-1 Chapter I This chapter provides a general introduction to transmission, storage, and distribution (TS&D) infrastructure issues and to the report. It describes why TS&D infrastructure is important to the U.S. energy system. It then covers a set

  10. Open PV Project: Unlocking PV Installation Data (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2012-04-01

    This brochure summarizes the Open PV Project, a collaborative effort of government, industry, and the public to compile a comprehensive database of PV installations in the United States. The brochure outlines the purpose and history of the project as well as the main capabilities and benefits of the online Open PV tool. The brochure also introduces how features of the tool are used, and it describes the sources and characteristics of Open PV's data and data collection processes.

  11. Forest County Potawatomi Community: Installation of Solar Photovoltaic Systems

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Forest County Potawatomi Community Installation of Solar Photovoltaic Systems Presented by: Nathan Karman Legal Department Forest County Potawatomi Community March 27, 2014 "Let us share our natural resources for the good of our People. Let us work for clean air and water and pray for the courage to stand up to those who would abuse our Mother Earth. So be it." - Bemwetek (Elder James Thunder) Excerpt from 2007 Class I Air Redesignation Public Hearing Prayer Community's Commitment to

  12. Weatherization Installer/Technician Fundamentals 2.0 - Mechanical

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ventilation Rough-In Guidelines | Department of Energy Mechanical Ventilation Rough-In Guidelines Weatherization Installer/Technician Fundamentals 2.0 - Mechanical Ventilation Rough-In Guidelines Mechanical Ventilation Rough-In Guidelines - Complete (25.92 MB) Lesson Plan: Mechanical Ventilation Rough-In Guidelines (125.71 KB) PowerPoint: Mechanical Ventilation Rough-In Guidelines (26.34 MB) More Documents & Publications Energy Auditor - Single Family 2.0: Mechanical Ventilation Energy

  13. Solar Regional Test Center in Vermont Achieves Milestone Installation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Regional Test Center in Vermont Achieves Milestone Installation - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense

  14. Wind Gains ground, hitting 33 GW of installed capacity

    SciTech Connect (OSTI)

    2010-06-15

    The U.S. currently has 33 GW of installed wind capacity. Wind continues to gain ground, accounting for 42 percent of new capacity additions in the US in 2008.Globally, there are now 146 GW of wind capacity with an impressive and sustained growth trajectory that promises to dominate new generation capacities in many developing countries. The U.S., however, lags many European countries, with wind providing roughly 2 percent of electricity generation.

  15. Field installation proves coiled tubing ESP completions successful

    SciTech Connect (OSTI)

    Tovar, J.J.; Head, P.; Jordan, R.

    1995-06-01

    Coiled tubing (CT) technology has contributed new and innovative solutions for wells using electrical submersible pumps (ESP). A CT-ESP deployment system was developed as part of a joint industry project to take advantage of this new technology. Ten oil and service companies and the EEC, under the Thermie program, participated in its development. Two main areas were identified to introduce these innovations. The first was deployment and well control. This area has a great impact on the safety and operational aspects of installing and servicing ESPs. The second is cost. As ESPs are considered for new field developments and recompletion of old fields, installation and workover costs play a major role in the selection of completion alternatives. One of the main limitations of ESPs in the past has been the economics of installation and uncertainty about pump life. With focus in these two major areas, a system was successfully produced that offers considerable advantages over existing technologies. The reduction in rig time and equipment cost makes this alternative very attractive for areas where technical and economic obstacles such as live well deployment and high operating cost limit the use of ESP technology. Two field tests have been carried successfully during the development of this system.

  16. Installation and assembly device and method of using

    DOE Patents [OSTI]

    Kolsun, George J.

    1997-01-01

    An installation and assembly device for aligning a first member such as a pump impeller with a second member such as an inlet nozzle of an impeller pump. The installation and assembly device includes a sleeve slideable within the inlet nozzle and a vertical positioning assembly which has a contact member that is extendable out away from the sleeve so as to vertically position the sleeve on a shoulder of the inlet nozzle and to present an upper contact surface spaced a certain distance from the shoulder to provide the desired vertical spacing with respect to the impeller contacting the upper contact surface. The vertical positioning assembly is retractable so as to allow for removal of the sleeve through the nozzle when installation and assembly are completed. The alignment device also includes a radial alignment assembly supported by the sleeve and adjustable to an expanded state for contacting and spacing the interior surface of the impeller a certain distance from the sleeve and hence a certain distance from the inlet nozzle. The radial alignment device being adjustable from a retracted removal state to an expanded state and also being adjustable to fine tune the spacing of the impeller from the sleeve. The radial alignment device also preferably includes members that can be used to releasably secure the sleeve to the impeller.

  17. Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States

    Broader source: Energy.gov [DOE]

    For the United States to ensure that the substantial rollout of offshore wind energy projects envisioned by the DOE is carried out in an efficient and cost-effective manner, it is important to observe the current and emerging practices in the international offshore wind energy industry. In this manner, the United States can draw from the experience already gained around the world, combined with experience from the sizeable U.S. land-based wind industry, to develop a strong offshore wind sector. The work detailed in this report will support that learning curve by enabling optimization of the cost-effectiveness of installation, operation, and maintenance activities for offshore wind farms.

  18. Installation and commissioning of the new Fermi National Accelerator Laboratory H- Magnetron

    SciTech Connect (OSTI)

    Bollinger, D. S.

    2014-02-15

    The Fermi National Accelerator Laboratory (FNAL) 40 year old Cockcroft-Walton 750 keV injectors with slit aperture magnetron ion sources have been replaced with a circular aperture magnetron, Low Energy Beam Transport, Radio Frequency Quadrupole Accelerator, and Medium Energy Beam Transport, as part of the FNAL Proton Improvement Plan. The injector design is based on a similar system at Brookhaven National Laboratory. The installation, commissioning efforts, and source operations to date will be covered in this paper along with plans for additional changes to the original design to improve reliability by reducing extractor spark rates and arc current duty factor.

  19. Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009

    SciTech Connect (OSTI)

    Barbose, Galen; Darghouth, Naim; Wiser, Ryan

    2010-12-13

    Installations of solar photovoltaic (PV) systems have been growing at a rapid pace in recent years. In 2009, approximately 7,500 megawatts (MW) of PV were installed globally, up from approximately 6,000 MW in 2008, consisting primarily of grid-connected applications. With 335 MW of grid-connected PV capacity added in 2009, the United States was the world's fourth largest PV market in 2009, behind Germany, Italy, and Japan. The market for PV in the United States is driven by national, state, and local government incentives, including up-front cash rebates, production-based incentives, requirements that electricity suppliers purchase a certain amount of solar energy, and federal and state tax benefits. These programs are, in part, motivated by the popular appeal of solar energy, and by the positive attributes of PV - modest environmental impacts, avoidance of fuel price risks, coincidence with peak electrical demand, and the possible deployment of PV at the point of use. Given the relatively high cost of PV, however, a key goal of these policies is to encourage cost reductions over time. Therefore, as policy incentives have become more significant and as PV deployment has accelerated, so too has the desire to track the installed cost of PV systems over time, by system characteristics, by system location, and by component. Despite the significant year-on-year growth, however, the share of global and U.S. electricity supply met with PV remains small, and annual PV additions are currently modest in the context of the overall electric system. To address this need, Lawrence Berkeley National Laboratory initiated a report series focused on describing trends in the installed cost of grid-connected PV systems in the United States. The present report, the third in the series, describes installed cost trends from 1998 through 2009, and provides preliminary cost data for systems installed in 2010. The analysis is based on project-level cost data from approximately 78

  20. Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008

    SciTech Connect (OSTI)

    Barbose, Galen L; Wiser, Ryan; Peterman, Carla; Darghouth, Naim

    2009-10-05

    Installations of solar photovoltaic (PV) systems have been growing at a rapid pace in recent years. In 2008, 5,948 MW of PV was installed globally, up from 2,826 MW in 2007, and was dominated by grid-connected applications. The United States was the world's third largest PV market in terms of annual capacity additions in 2008, behind Spain and Germany; 335 MW of PV was added in the U.S. in 2008, 293 MW of which came in the form of grid-connected installations. Despite the significant year-on-year growth, however, the share of global and U.S. electricity supply met with PV remains small, and annual PV additions are currently modest in the context of the overall electric system. The market for PV in the U.S. is driven by national, state, and local government incentives, including up-front cash rebates, production-based incentives, requirements that electricity suppliers purchase a certain amount of solar energy, and Federal and state tax benefits. These programs are, in part, motivated by the popular appeal of solar energy, and by the positive attributes of PV - modest environmental impacts, avoidance of fuel price risks, coincidence with peak electrical demand, and the location of PV at the point of use. Given the relatively high cost of PV, however, a key goal of these policies is to encourage cost reductions over time. Therefore, as policy incentives have become more significant and as PV deployment has accelerated, so too has the desire to track the installed cost of PV systems over time, by system characteristics, by system location, and by component. To address this need, Lawrence Berkeley National Laboratory initiated a report series focused on describing trends in the installed cost of grid-connected PV systems in the U.S. The present report, the second in the series, describes installed cost trends from 1998 through 2008. The analysis is based on project-level cost data from more than 52,000 residential and non-residential PV systems in the U.S., all of

  1. Implementation of Army privatization directives at Forscom installations

    SciTech Connect (OSTI)

    Armstrong, R.C.; Patwardhan, S.

    1997-06-01

    {open_quotes}Privatization{close_quotes} has become the buzzword of the 1990s not only here in the United States but throughout the world. Privatization has been traditionally defined as the sale/transfer of state-owned (i.e. federal, state, county, city or public) assets to the private sector. Although there are numerous reasons for the privatization of state-owned assets, the primary reasons include the generation of a significant amount of cash to the state (Great Britain`s sale of electric power industry); capitalization of the formerly state-owned utility (sale of the utilities within many countries of the former Soviet Union); and state policy goals of eliminating monopolies, encouraging competition, and restructuring (Chile). Several year ago, the Department of Defense (DoD) and specifically the Department of Army (DoA) initiated its own `Privatization Process`. Coupled with shrinking budgets, workforce and funding resources from the Government, the Army was faced with antiquated utility infrastructure in need of significant upgrades and in some cases total replacements. Recognizing that the provision of utility services was not a core mission of the Army, DoA has encouraged its Installations throughout the country to consider the privatization of the Government-owned utility systems. In compliance with DoA policy, Forces Command (FORSCOM) has been at the forefront of the privatization process. To date, FORSCOM has initiated the process of analyzing the potential privatization of over 30 utility systems at 12 FORSCOM Installations located throughout the country. The FORSCOM Installations include Fort Irwin, CA; Fort Campbell, KY; Fort Bragg, NC; Fort McPherson, GA; Fort Hood, TX; Fort Polk, LA; Fort Lewis, WA; Fort Riley, KS; Fort Stewart, GA; Hunter Army Airfield, GA; Fort Carson, CO; Fort Devens, MA; Fort Dix, NJ; and Fort Gillem, GA.

  2. Graduate students from two British universities install a critical new

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    diagnostic on NSTX-U | Princeton Plasma Physics Lab Graduate students from two British universities install a critical new diagnostic on NSTX-U By John Greenwald December 21, 2015 Tweet Widget Google Plus One Share on Facebook David Thomas and Jakob Brunner (Photo by Elle Starkman/Office of Communications) David Thomas and Jakob Brunner Gallery: From left: Jakob Brunner and David Thomas, with advisor Prof. Roddy Vann of the University of York on the screen in the center. (Photo by Elle

  3. Graduate students from two British universities install a critical new

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    diagnostic on NSTX-U | Princeton Plasma Physics Lab Graduate students from two British universities install a critical new diagnostic on NSTX-U By John Greenwald December 21, 2015 Tweet Widget Google Plus One Share on Facebook David Thomas and Jakob Brunner (Photo by Elle Starkman/Office of Communications) David Thomas and Jakob Brunner Gallery: From left: Jakob Brunner and David Thomas, with advisor Prof. Roddy Vann of the University of York on the screen in the center. (Photo by Elle

  4. Oil/gas separator for installation at burning wells

    DOE Patents [OSTI]

    Alonso, Carol T.; Bender, Donald A.; Bowman, Barry R.; Burnham, Alan K.; Chesnut, Dwayne A.; Comfort, III, William J.; Guymon, Lloyd G.; Henning, Carl D.; Pedersen, Knud B.; Sefcik, Joseph A.; Smith, Joseph A.; Strauch, Mark S.

    1993-01-01

    An oil/gas separator is disclosed that can be utilized to return the burning wells in Kuwait to production. Advantageously, a crane is used to install the separator at a safe distance from the well. The gas from the well is burned off at the site, and the oil is immediately pumped into Kuwait's oil gathering system. Diverters inside the separator prevent the oil jet coming out of the well from reaching the top vents where the gas is burned. The oil falls back down, and is pumped from an annular oil catcher at the bottom of the separator, or from the concrete cellar surrounding the well.

  5. Oil/gas separator for installation at burning wells

    DOE Patents [OSTI]

    Alonso, C.T.; Bender, D.A.; Bowman, B.R.; Burnham, A.K.; Chesnut, D.A.; Comfort, W.J. III; Guymon, L.G.; Henning, C.D.; Pedersen, K.B.; Sefcik, J.A.; Smith, J.A.; Strauch, M.S.

    1993-03-09

    An oil/gas separator is disclosed that can be utilized to return the burning wells in Kuwait to production. Advantageously, a crane is used to install the separator at a safe distance from the well. The gas from the well is burned off at the site, and the oil is immediately pumped into Kuwait's oil gathering system. Diverters inside the separator prevent the oil jet coming out of the well from reaching the top vents where the gas is burned. The oil falls back down, and is pumped from an annular oil catcher at the bottom of the separator, or from the concrete cellar surrounding the well.

  6. NREL Job Task Analysis: Retrofit Installer Technician (Revised)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Retrofit Installer Technician Chuck Kurnik National Renewable Energy Laboratory Cynthia Woodley Professional Testing Inc. Technical Report NREL/TP-7A20-51671 Revised April 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 15013 Denver West Parkway Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 NREL Job

  7. Key issues for low-cost FGD installations

    SciTech Connect (OSTI)

    DePriest, W.; Mazurek, J.M.

    1995-12-01

    This paper will discuss various methods for installing low-cost FGD systems. The paper will include a discussion of various types of FGD systems available, both wet and dry, and will compare the relative cost of each type. Important design issues, such as use of spare equipment, materials of construction, etc. will be presented. An overview of various low-cost construction techniques (i.e., modularization) will be included. This paper will draw heavily from Sargent & Lundy`s database of past and current FGD projects together with information we gathered for several Electric Power Research Institute (EPRI) studies on the subject.

  8. NREL: Hydrogen and Fuel Cells Research - NREL Facilitates Installment of

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Advanced Hydrogen Fuel Station in Washington, D.C. NREL Facilitates Installment of Advanced Hydrogen Fuel Station in Washington, D.C. July 28, 2016 Photo of a man standing outside at a podium and giving a speech to a seated crowd. Former U.S. Senator Byron Dorgan provided opening comments before the official ribbon-cutting ceremony. Photo courtesy of American Honda Photo of a white four-door vehicle parked in a lot next to two other vehicles. Several people are standing and walking around

  9. QER SECOND INSTALLMENT PUBLIC MEETING-AUSTIN, TEXAS | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy AUSTIN, TEXAS QER SECOND INSTALLMENT PUBLIC MEETING-AUSTIN, TEXAS MEETING DATE AND LOCATION Monday, May, 9, 2016 Doors open: 8:00 AM; Program begins: 8:30 AM University of Texas Peter O'Donnell, Jr. Applied Computational Engineering and Sciences Building Avaya Auditorium (POB 2.302) 201 East 24th Street Austin, TX 78712 Due to technical difficulties, there will not be video for this event. The meeting transcript will be made available. MEETING INFORMATION The Quadrennial Energy Review

  10. Excavation roof support and method of installing the same

    SciTech Connect (OSTI)

    Bohnes, K.; Fitzgerald, H.J.; Koppers, M.

    1981-07-07

    A method and a system are disclosed for supporting an overburden. A single-section or telescoped multi-section longitudinally slit prop casing of light sheet material such as cardboard or metal has a fabric bag installed in it. When the casing is erected the bag is filled with a slurry of hardenable substance which, upon hardening, forms in the bag a column which supports the overburden. The casing may be left in place or it may be removed for re-use.

  11. Toolkit for Installing Solar on K-12 Schools

    Broader source: Energy.gov [DOE]

    Following the release of The Solar Foundation's Brighter Future: A Study on Solar in U.S. Schools under the Solar Outreach Partnership, the organization has been working to help more K-12 public schools go solar through its technical assistance program. As part of this effort, they developed the Toolkit for Installing Solar on K-12 Schools to compile new and existing resources, designed to provide public school officials with a starting point for pursuing their own solar projects. Hands-on guidance in putting the ideas contained within this toolkit into action is available through the SolarOPs Technical Assistance program.

  12. LANSCE harp upgrade: analysis, design, fabrication and installation

    SciTech Connect (OSTI)

    Gilpatrick, John D; Chacon, Phillip; Martinez, Derwin; Power, John F; Smith, Brian G; Taylor, Mark A; Gruchalla, Mike

    2010-01-01

    The primary goal of this newly installed beam profile measurement is to provide the facility operators and physicists with a reliable horizontal and vertical projected beam distribution and location with respect to the proton beam target and beam aperture. During a 3000-hour annual run cycle, 5 {mu}C of charge is delivered every 50 milliseconds through this harp to the downstream TRMS Mark III target. The resulting radioactive annual dose near this harp is at least 6 MGy. Because of this harsh environment, the new harp design has been further optimized for robustness. For example, compared to an earlier design, this harp has half of the sensing wires and utilizes only a single bias plane. The sensing fibers are 0.079-mm diameter SiC fibers. To hold these fibers to a rigid ceramic structure, a collet fiber-clamping device accomplishes the three goals of maintaining a mechanical fiber clamp, holding the sense fibers under a slight tensile force, and providing a sense-fiber electrical connection. This paper describes the harp analysis and design, and provides fabrication, assembly, and some installation information, and discusses wiring alterations.

  13. NEPA mitigation and monitoring activities on Army installations

    SciTech Connect (OSTI)

    Reinke, D.C.; Robitaille, P.

    1995-12-01

    The Army National Environmental Policy Act (NEPA) implementation regulation AR 200-2 (Army Regulation) requires only mitigation measures that can reasonably be accompanied as part of a proposed alternative be identified in the NEPA document. Failure of the identified mitigation actions to be executed or to perform as expected leads to a required reevaluation of the project and the significance of its impacts. The USAEC has undertaken a study of mitigation and monitoring actions listed in Army NEPA documents. As part of the USAEC NEPA program the study has outlined three major tasks (1) collection of a significant sample of Army NEPA documents, (2) review environmental documentation management and retention, and (3) review in detail a subsample of documents and follow-up with site visits. Some 242 Army NEPA documents, Environmental Assessments (EA) and Environmental Impact Statements (EIS) were collected and evaluated for mitigation requirements. Ninety seven of the 242 NEPA documents committed to one or more mitigation actions. While a wide array of mitigating activities have been identified in these documents, the four most common are (1) management plans and practices, (2) training actions, (3) revegetation actions, and (4) construction practices. Site visits to selected Army installations showed that mitigation practices were for the most part being done, but were poorly documented. No installation visited had a mitigation monitoring plan in place as required by AR 200-2.

  14. Million Solar Strong: U.S. Hits Millionth Solar Energy Installation...

    Office of Environmental Management (EM)

    Million Solar Strong: U.S. Hits Millionth Solar Energy Installation Million Solar Strong: U.S. Hits Millionth Solar Energy Installation April 21, 2016 - 1:14pm Addthis Million ...

  15. Gamesa Installs 2-MW Wind Turbine at NWTC | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Gamesa Installs 2-MW Wind Turbine at NWTC Gamesa Installs 2-MW Wind Turbine at NWTC December 19, 2011 - 3:12pm Addthis This is an excerpt from the Fourth Quarter 2011 edition of ...

  16. So You Want to Go Solar? 3 Things to Consider When Installing...

    Energy Savers [EERE]

    So You Want to Go Solar? 3 Things to Consider When Installing Solar Power at Home So You Want to Go Solar? 3 Things to Consider When Installing Solar Power at Home October 3, 2014 ...

  17. Installation restoration program. Phase I. Records search. Niagara Falls Air Force Reserve facility, New York

    SciTech Connect (OSTI)

    Not Available

    1983-12-01

    The Department of Defense (DOD) has developed a program to identify and evaluate past hazardous material disposal sites on DOD property, to control the migration of hazardous contaminants, and to control hazards to health or welfare that may result from these past disposal operations. This program is called the Installation Restoration Program (IRP). The IRP has four phases consisting of Phase I, Initial Assessment/Records Search; Phase II, Confirmation and Quantification; Phase III, Technology Base Development; and Phase IV, Operations/Remedial Measures. Niagara Falls AFRF is located in Niagara County, New York, approximately six miles northeast of the City of Niagara Falls and approximately fifteen miles north of Buffalo. The installation is currently comprised of 985 acres with a base population of approximately 2,560. The following areas were determined to have a sufficient potential to create environmental contamination and follow-on investigation is warranted: Bldg. 600 JP-4 Pipeline Leak; POL JP-4 Tank C; Landfill; BX MOGAS Tank Leak; NYANG Hazardous Waste Drum Storage; POL JP-4 Tank A; JP-4 Tank Truck Spill; Bldg. 202 Drum Storage Yard; Fire Training Facility No. 1, 2 and 3; Bldg. 850 Drum Storage Yard; and AFRES Hazardous Waste Drum Storage.

  18. A Framework to Survey the Energy Efficiency of Installed Motor Systems

    SciTech Connect (OSTI)

    Rao, Prakash; Hasanbeigi, Ali; McKane, Aimee

    2013-08-01

    While motors are ubiquitous throughout the globe, there is insufficient data to properly assess their level of energy efficiency across regional boundaries. Furthermore, many of the existing data sets focus on motor efficiency and neglect the connected drive and system. Without a comprehensive survey of the installed motor system base, a baseline energy efficiency of a country or region’s motor systems cannot be developed. The lack of data impedes government agencies, utilities, manufacturers, distributers, and energy managers when identifying where to invest resources to capture potential energy savings, creating programs aimed at reducing electrical energy consumption, or quantifying the impacts of such programs. This paper will outline a data collection framework for use when conducting a survey under a variety of execution models to characterize motor system energy efficiency within a country or region. The framework is intended to standardize the data collected ensuring consistency across independently conducted surveys. Consistency allows for the surveys to be leveraged against each other enabling comparisons to motor system energy efficiencies from other regions. In creating the framework, an analysis of various motor driven systems, including compressed air, pumping, and fan systems, was conducted and relevant parameters characterizing the efficiency of these systems were identified. A database using the framework will enable policymakers and industry to better assess the improvement potential of their installed motor system base particularly with respect to other regions, assisting in efforts to promote improvements to the energy efficiency of motor driven systems.

  19. Modeling a Typical Winter-time Dust Event over the Arabian Peninsula and the Red Sea

    SciTech Connect (OSTI)

    Kalenderski, S.; Stenchikov, G.; Zhao, Chun

    2013-02-20

    We used WRF-Chem, a regional meteorological model coupled with an aerosol-chemistry component, to simulate various aspects of the dust phenomena over the Arabian Peninsula and Red Sea during a typical winter-time dust event that occurred in January 2009. The model predicted that the total amount of emitted dust was 18.3 Tg for the entire dust outburst period and that the two maximum daily rates were ~2.4 Tg/day and ~1.5 Tg/day, corresponding to two periods with the highest aerosol optical depth that were well captured by ground- and satellite-based observations. The model predicted that the dust plume was thick, extensive, and mixed in a deep boundary layer at an altitude of 3-4 km. Its spatial distribution was modeled to be consistent with typical spatial patterns of dust emissions. We utilized MODIS-Aqua and Solar Village AERONET measurements of the aerosol optical depth (AOD) to evaluate the radiative impact of aerosols. Our results clearly indicated that the presence of dust particles in the atmosphere caused a significant reduction in the amount of solar radiation reaching the surface during the dust event. We also found that dust aerosols have significant impact on the energy and nutrient balances of the Red Sea. Our results showed that the simulated cooling under the dust plume reached 100 W/m2, which could have profound effects on both the sea surface temperature and circulation. Further analysis of dust generation and its spatial and temporal variability is extremely important for future projections and for better understanding of the climate and ecological history of the Red Sea.

  20. NREL and Army Validate Energy Savings for Net Zero Energy Installations -

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    News Releases | NREL NREL and Army Validate Energy Savings for Net Zero Energy Installations Net Zero Energy Installations could save millions a year in energy costs October 27, 2014 The U.S. Army (Army) has partnered with the Energy Department's National Renewable Energy Laboratory (NREL) to increase energy security through improved energy efficiency and optimized renewable energy strategies at nine installations in the Army's portfolio. If all nine of the Army Net Zero Energy Installation

  1. EERE Success Story-Helping Ensure High-Quality Installation of Solar

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Power Technologies | Department of Energy Helping Ensure High-Quality Installation of Solar Power Technologies EERE Success Story-Helping Ensure High-Quality Installation of Solar Power Technologies April 15, 2013 - 12:00am Addthis Lorain County Community College Instructors install PV modules on training roof labs during the Midwest Renewable Energy Associationñ€™s Train-the-Trainer PV Instructor Institute course. Lorain County Community College Instructors install PV modules on training

  2. Post-Installation Report Outline (IDIQ Attachment J-9) | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Installation Report Outline (IDIQ Attachment J-9) Post-Installation Report Outline (IDIQ Attachment J-9) Document offers a post-installation report outline sample for an energy savings performance contract. Download the post-installation report outline document. (56.26 KB) More Documents & Publications Measurement and Verification Plan and Savings Calculations Methods Outline (IDIQ Attachment J-8) Annual Report Outline (IDIQ Attachment J-10) ESPC Task Order Financial Schedules

  3. U.S. Installation, Operation, and Performance Standards for Microturbine Generator Sets, August 2000

    Office of Energy Efficiency and Renewable Energy (EERE)

    Report detailing the various codes and standards that are applicable for the installation, operation, and performance of microturbines.

  4. EnPI V4.0 Installation and Uninstallation Instructions | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Instructions on how to install or uninstall the EnPI Tool v4.0. EnPI Installation and Un-Install Instructions (743.03 KB) More Documents & Publications EnPI V4.0 User Manual EnPI ...

  5. Assessment of cogeneration technologies for use at Department of Defense installations. Final report

    SciTech Connect (OSTI)

    Binder, M.J.; Cler, G.L.

    1996-01-01

    Cogeneration is the simultaneous generation of two types of energy, usually electricity and thermal energy, from a single energy source such as natural gas or diesel fuel. Cogeneration systems can be twice (or more) as efficient than conventional energy systems since both the electricity and the available thermal energy produced as a by-product of the electric generation, are used. This study identified cogeneration technologies and equipment capable of meeting Department of Defense (DOD) requirements for generation of electrical and thermal energy and described a wide range of successful cogeneration system configurations potentially applicable to DOD energy plants, including: cogeneration system prime movers, electrical generating equipment, heat recovery equipment, and control systems. State of the art cogeneration components are discussed in detail along with typical applications and analysis tools that are currently available to assist in the evaluation of potential cogeneration projects. A basic analysis was performed for 55 DOD installations to determine the economic benefits of cogeneration to the DOD. The study concludes that, in general, cogeneration systems can be a very cost effective method of providing the military with its energy needs.

  6. Solar space heating installed at Kansas City, Kansas. Final report

    SciTech Connect (OSTI)

    Not Available

    1981-05-01

    The solar energy system was constructed with the new 48,800 square feet warehouse to heat the warehouse area of about 39,000 square feet while the auxiliary energy system heats the office area of about 9800 square feet. The building is divided into 20 equal units, and each has its own solar system. The modular design permits the flexibility of combining multiple units to form offices or warehouses of various size floor areas as required by a tenant. Each unit has 20 collectors which are mounted in a single row. The collectors, manufactured by Solaron Corporation, are double glazed flat plate collectors with a gross area of 7800 ft/sup 2/. Air is heated either through the collectors or by the electric resistance duct coils. No freeze protection or storage is required for this system. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are included.

  7. Gas turbine nozzle vane insert and methods of installation

    DOE Patents [OSTI]

    Miller, William John; Predmore, Daniel Ross; Placko, James Michael

    2002-01-01

    A pair of hollow elongated insert bodies are disposed in one or more of the nozzle vane cavities of a nozzle stage of a gas turbine. Each insert body has an outer wall portion with apertures for impingement-cooling of nozzle wall portions in registration with the outer wall portion. The insert bodies are installed into the cavity separately and spreaders flex the bodies toward and to engage standoffs against wall portions of the nozzle whereby the designed impingement gap between the outer wall portions of the insert bodies and the nozzle wall portions is achieved. The spreaders are secured to the inner wall portions of the insert bodies and the bodies are secured to one another and to the nozzle vane by welding or brazing.

  8. Information handbook on independent spent fuel storage installations

    SciTech Connect (OSTI)

    Raddatz, M.G.; Waters, M.D.

    1996-12-01

    In this information handbook, the staff of the U.S. Nuclear Regulatory Commission describes (1) background information regarding the licensing and history of independent spent fuel storage installations (ISFSIs), (2) a discussion of the licensing process, (3) a description of all currently approved or certified models of dry cask storage systems (DCSSs), and (4) a description of sites currently storing spent fuel in an ISFSI. Storage of spent fuel at ISFSIs must be in accordance with the provisions of 10 CFR Part 72. The staff has provided this handbook for information purposes only. The accuracy of any information herein is not guaranteed. For verification or for more details, the reader should refer to the respective docket files for each DCSS and ISFSI site. The information in this handbook is current as of September 1, 1996.

  9. Underground coal operators install several new longwall mining systems

    SciTech Connect (OSTI)

    Fiscor, S.

    2008-02-15

    Several new names appear in the annual US Longwall Census, but the population remains the same: 52 although the number of longwall mines dropped from 40 to 47. CONSOL Energy remains the leader with 12 faces. Robert E. Murray owns 8 longwall mines followed by Arch Coal with 5 and Foundation Coal with 3. West Virginia has 13 longwalls followed by 9 in Pennsylvania, 7 in Utah and 6 in Alabama. The article describes CONSOL Energy's operations. A detailed table gives for each longwall installation, the ownership, seam height, cutting height, panel width and length, overburden, number of gate entries, depth of cut, model of equipment used (shearer, haulage system, roof support, face conveyor, stage loader, crusher, electrical controls and voltage to face). 2 tabs.

  10. Experimental Evaluation of Installed Cooking Exhaust Fan Performance

    SciTech Connect (OSTI)

    Singer, Brett C.; Delp, William W.; Apte, Michael G.

    2010-11-01

    The installed performance of cooking exhaust fans was evaluated through residential field experiments conducted on a sample of 15 devices varying in design and other characteristics. The sample included two rear downdraft systems, two under-cabinet microwave over range (MOR) units, three different installations of an under-cabinet model with grease screens across the bottom and no capture hood, two devices with grease screens covering the bottom of a large capture hood (one under-cabinet, one wall-mount chimney), four under-cabinet open hoods, and two open hoods with chimney mounts over islands. Performance assessment included measurement of airflow and sound levels across fan settings and experiments to quantify the contemporaneous capture efficiency for the exhaust generated by natural gas cooking burners.Capture efficiency is defined as the fraction of generated pollutants that are removed through the exhaust and thus not available for inhalation of household occupants. Capture efficiency (CE) was assessed for various configurations of burner use (e.g., single front, single back, combination of one front and one back, oven) and fan speed setting. Measured airflow rates were substantially lower than the levels noted in product literature for many of the units. This shortfall was observed for several units costing in excess of $1000. Capture efficiency varied widely (from<5percent to roughly 100percent) across devices and across conditions for some devices. As expected, higher capture efficiencies were achieved with higher fan settings and the associated higher air flow rates. In most cases, capture efficiencies were substantially higher for rear burners than for front burners. The best and most consistent performance was observed for open hoods that covered all cooktop burners and operated at higher airflow rates. The lowest capture efficiencies were measured when a front burner was used with a rear backdraft system or with lowest fan setting for above the range

  11. Safety of Hydrogen Systems Installed in Outdoor Enclosures

    SciTech Connect (OSTI)

    Barilo, Nick F.

    2013-11-06

    The Hydrogen Safety Panel brings a broad cross-section of expertise from the industrial, government, and academic sectors to help advise the U.S. Department of Energy’s (DOE) Fuel Cell Technologies Office through its work in hydrogen safety, codes, and standards. The Panel’s initiatives in reviewing safety plans, conducting safety evaluations, identifying safety-related technical data gaps, and supporting safety knowledge tools and databases cover the gamut from research and development to demonstration and deployment. The Panel’s recent work has focused on the safe deployment of hydrogen and fuel cell systems in support of DOE efforts to accelerate fuel cell commercialization in early market applications: vehicle refueling, material handling equipment, backup power for warehouses and telecommunication sites, and portable power devices. This paper resulted from observations and considerations stemming from the Panel’s work on early market applications. This paper focuses on hydrogen system components that are installed in outdoor enclosures. These enclosures might alternatively be called “cabinets,” but for simplicity, they are all referred to as “enclosures” in this paper. These enclosures can provide a space where a flammable mixture of hydrogen and air might accumulate, creating the potential for a fire or explosion should an ignition occur. If the enclosure is large enough for a person to enter, and ventilation is inadequate, the hydrogen concentration could be high enough to asphyxiate a person who entered the space. Manufacturers, users, and government authorities rely on requirements described in codes to guide safe design and installation of such systems. Except for small enclosures used for hydrogen gas cylinders (gas cabinets), fuel cell power systems, and the enclosures that most people would describe as buildings, there are no hydrogen safety requirements for these enclosures, leaving gaps that must be addressed. This paper proposes that a technical

  12. The Creation of a French Basic Nuclear Installation - Description of the Regulatory Process - 13293

    SciTech Connect (OSTI)

    Mahe, Carole; Leroy, Christine

    2013-07-01

    CEA is a French government-funded technological research organization. It has to build a medium-level waste interim storage facility because the geological repository will not be available until 2025. This interim storage facility, called DIADEM, has to be available in 2017. These wastes are coming from the research facilities for spent fuel reprocessing and the dismantling of the most radioactive parts of nuclear facilities. The CEA handles the waste management by inventorying the needs and updating them regularly. The conception of the facility is mainly based on this inventory. It provides quantity and characteristics of wastes and it gives the production schedule until 2035. Beyond mass and volume, main characteristics of these radioactive wastes are chemical nature, radioisotopes, radioactivity, radiation dose, the heat emitted, corrosive or explosive gas production, etc. These characteristics provide information to study the repository safety. DIADEM mainly consists of a concrete cell, isolated from the outside, wherein stainless steel welded containers are stored, stacked in a vertical position in the racks. DIADEM is scheduled to store three types of 8 mm-thick, stainless steel cylindrical containers with an outside diameter 498 mm and height from 620 to 2120 mm. DIADEM will be a basic nuclear installation (INB in French) because of overall activity of radioactive substances stored. The creation of a French basic nuclear installation is subject to authorization according to the French law No. 2006-686 of 13 June 2006 on Transparency and Security in the Nuclear Field. The authorization takes into account the technical and financial capacities of the licensee which must allow him to conduct his project in compliance with these interests, especially to cover the costs of decommissioning the installation and conduct remediation work, and to monitor and maintain its location site or, for radioactive waste disposal installations, to cover the definitive shut

  13. Issue #3: HVAC Proper Installation Energy Savings: Over-Promising or

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Under-Delivering? | Department of Energy 3: HVAC Proper Installation Energy Savings: Over-Promising or Under-Delivering? Issue #3: HVAC Proper Installation Energy Savings: Over-Promising or Under-Delivering? What energy savings are realistically achievable by following quality installation standards for installation, operation, and maintenance of residential HVAC? issue3_airflow_charge.pdf (804.56 KB) issue3_hvac_installed.pdf (89.79 KB) issue3_pdi_hvacsys.pdf (325.73 KB) More Documents

  14. Evaluation of the reliability of a conventional platform installed in South Pass Block 47 of the Mississippi River delta

    SciTech Connect (OSTI)

    Bea, R.G.

    1996-12-31

    In August 1995, the Energy Development Corporation (EDC) installed a conventional drilling and production platform in South Pass Block 47 (SP 47). Due to its proximity to the delta of the Mississippi River, this platform will be subject to the environmental forces developed by hurricanes and movements of the sea floor. This paper summarizes results from probability based study of the reliability characteristics of a conventional platform installed in SP 47. Bases for evaluation of the acceptability of the reliability of the platform are developed. This paper shows how reliability methods can be used to help improve the efficiency of offshore platforms. Application of traditional engineering approaches indicated the need for a mudslide resistant platform. Given that a mudslide resistant platform was required, then the gas reserves could not have been developed.

  15. LED system performance in a trial installation - one year later: Yuma border patrol, Yuma, Arizona

    SciTech Connect (OSTI)

    Wilkerson, Andrea M.; Davis, Robert G.

    2015-04-01

    The Yuma Sector Border Patrol Area is a high temperature and high solar radiation environment, providing an opportunity for the U.S. Department of Energy (DOE) to study thermal effects on outdoor light-emitting diode (LED) luminaires outside of the testing laboratory. Six LED luminaires were installed on three poles on the U.S.- Mexico border in February 2014 as part of a trial installation, which was detailed in a prior GATEWAY report.1 The initial trial installation was intended as a short - term test of six luminaires installed on three poles before proceeding with the complete installation of over 400 luminaires. Unexpected delays in the full installation have prevented the detailed evaluations initially planned, but the six installed LED luminaires continue to be monitored, and over the past year illuminance measurements were recorded initially in February 2014 and again in September 2014 at about 2500 hours of operation and in March 2015 at about 5000 hours of operation.

  16. Fast Company covers "Just Your Typical New Mexico Image Recognition Startup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Spun Off From A Government Lab" (Not) just your typical Lab spin off Fast Company covers "Just Your Typical New Mexico Image Recognition Startup Spun Off From A Government Lab" Far from Silicon Valley, Descartes Labs aims to turn a national research facility's AI research into new ways of understanding the world. July 30, 2015 Fast Company covers "Just Your Typical New Mexico Image Recognition Startup Spun Off From A Government Lab" Descartes Labs cofounders Mark

  17. Fact #906: January 4, 2016 VMT and the Price of Gasoline Typically Move in

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Opposition - Dataset | Department of Energy Fact #906: January 4, 2016 VMT and the Price of Gasoline Typically Move in Opposition - Dataset Fact #906: January 4, 2016 VMT and the Price of Gasoline Typically Move in Opposition - Dataset Excel file and dataset for VMT and the Price of Gasoline Typically Move in Opposition fotw#906_web.xlsx (51.4 KB) More Documents & Publications Fact #860 February 16, 2015 Relationship of Vehicle Miles of Travel and the Price of Gasoline - Dataset Fact

  18. Solar absorber panel, collector assembly and installation method

    SciTech Connect (OSTI)

    Spencer, D.L.

    1980-12-23

    A solar absorber panel assembly has a pair of substantially parallel plates sealed together at their perimeter. A raised integral header is formed in one of the plates. An external header is in fluid communication with the integral header and is spaced from and mechanically connected to the plates. A solar collector assembly includes hanger brackets mounted on an inclined support surface to engage and retain bodies of insulation material and solar absorber panels. The absorber panels are in side-by-side relation with relatively slidable slightly overlapping marginal portions. External headers on the absorber panels are connected together by slip-on resilient sleeves of silicone rubber. An enclosure having a transparent cover and a wall extending around a plurality of absorber panels and external headers is attached directly to the support surface independently of the hanger brackets and absorber panels. The cover is supported by cover support brackets mounted on the support surface and extending upwardly between panels, passing through openings formed by lateral recesses in the marginal portions of the absorber panels. A solar collector is installed by attaching hanger brackets to an inclined support surface, placing thermal insulation and absorber panels on the hanger brackets to prevent downward slipping movement, and enclosing the absorber panels with a cover which is transmissive of radiant solar energy.

  19. Resource Form Factor and Installation of GFA Controllers

    SciTech Connect (OSTI)

    DeSteese, John G.; Hammerstrom, Donald J.

    2009-11-15

    The focus of this task is to optimize the form and placement of a controller comprising the Grid Friendly™ appliance (GFA) controller, power supply and power relay (and/or a solid-state power electronic switch) that would command a domestic water heater to shed its load in response to stress on the electric power grid. The GFA controller would disconnect the water heater from its supply circuit whenever it senses a low voltage signal or other indicators of system stress communicated via the electric power distribution system. Power would be reconnected to the appliance when the GFA controller senses the absence of these signals. This project has also considered more frequent cycling of this controller’s relay switch to perform demand-side frequency regulation. The principal criteria considered in this optimization are reliability, cost and life expectancy of the GFA components. The alternative embodiments of the GFA equipment under consideration are: Option 1- installation inside the insulation space of the water heater between the tank and jacket Option 2 containment in a separate nearby electrical enclosure Option 3 - as a modification or adjunct to the distribution panel housing and/or the breaker that protects the water heater supply circuit.

  20. Development of a deepwater installation and maintenance concept for subsea production systems

    SciTech Connect (OSTI)

    Brancart, C.P.; Henkener, J.A.

    1996-09-01

    Most of the world`s remaining high output petroleum reservoirs tend to be located in the deep ocean. Existing capabilities are challenged for producing oil in 3,000 to 6,000 feet of sea water. It may be possible to extrapolate these existing capabilities for deeper operations but with an associated exponential cost increase. Based on technologies derived from Department of Defense programs, the authors have proposed a subsea completion installation and maintenance concept that requires no mechanical ties between the surface and the bottom of the ocean. Using tetherless underwater vehicles, a modularized subsea completion system can be delivered to the ocean floor, where it is assembled, inter-connected, and tested. The concept is further amplified in the paper.

  1. Net Zero Energy Military Installations: A Guide to Assessment and Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Net Zero Energy Military Installations: A Guide to Assessment and Planning Net Zero Energy Military Installations: A Guide to Assessment and Planning In 2008, DoD and DOE defined a joint initiative to address military energy use by identifying specific actions to reduce energy demand and increase use of renewable energy on DoD installations. 48876.pdf (1.74 MB) More Documents & Publications Lessons Learned from Net Zero Energy Assessments and Renewable Energy

  2. Building America Expert Meeting: Achieving the Best Installed Performance from High-Efficiency Residential Gas Furnaces

    Broader source: Energy.gov [DOE]

    This report describes a Building America expert meeting hosted on July 28, 2011, by the Partnership for Advanced Residential Retrofit team. The purpose of this meeting was to identify installation practices that provide the best installed efficiency for residential gas furnaces, explain how AFUE and field efficiency can differ, and investigate the impact of installation practices on the efficiency and long-term durability of the furnace.

  3. Fact #893: October 5, 2015 Incentives for the Installation of Electric

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vehicle Charging Stations | Department of Energy 3: October 5, 2015 Incentives for the Installation of Electric Vehicle Charging Stations Fact #893: October 5, 2015 Incentives for the Installation of Electric Vehicle Charging Stations SUBSCRIBE to the Fact of the Week Many state governments are providing incentives for the installation of electric vehicle supply equipment (EVSE), also known as an electric vehicle charging station. The most common type of incentive is a state tax credit, but

  4. Expert Meeting Report: Achieving the Best Installed Performance from High-Efficiency Residential Gas Furnaces

    SciTech Connect (OSTI)

    Brand, Larry

    2012-03-01

    This report describes a Building America expert meeting hosted on July 28, 2011, by the Partnership for Advanced Residential Retrofit (PARR) team. The purpose of this meeting was to identify installation practices that provide the best installed efficiency for residential gas furnaces, explain how AFUE and field efficiency can differ, and investigate the impact of installation practices on the efficiency and long-term durability of the furnace.

  5. Expert Meeting Report: Achieving the Best Installed Performance from High-Efficiency Residential Gas Furnaces

    SciTech Connect (OSTI)

    Brand, L.

    2012-03-01

    This report describes a Building America expert meeting hosted on July 28, 2011, by the Partnership for Advanced Residential Retrofit team. The purpose of this meeting was to identify installation practices that provide the best installed efficiency for residential gas furnaces, explain how AFUE and field efficiency can differ, and investigate the impact of installation practices on the efficiency and long-term durability of the furnace.

  6. Fact #893: October 5, 2015 Incentives for the Installation of Electric

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vehicle Charging Stations - Dataset | Department of Energy 3: October 5, 2015 Incentives for the Installation of Electric Vehicle Charging Stations - Dataset Fact #893: October 5, 2015 Incentives for the Installation of Electric Vehicle Charging Stations - Dataset Excel file and dataset for Incentives for the Installation of Electric Vehicle Charging Stations fotw#893_web.xlsx (169.6 KB) More Documents & Publications Richmond Electric Vehicle Initiative Electric Vehicle Readiness Plan

  7. EERE Success Story-Plug and Play: Purchase, Install, and Connect

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Residential Solar Power in Hours | Department of Energy Plug and Play: Purchase, Install, and Connect Residential Solar Power in Hours EERE Success Story-Plug and Play: Purchase, Install, and Connect Residential Solar Power in Hours March 16, 2015 - 5:58pm Addthis Fraunhofer CSE demonstrates Plug and Play PV System installation and commissioning in just 75 minutes at the Massachusetts Clean Energy Centerñ€™s Wind Technology Testing Center. Photo Credit: Fraunhofer CSE Fraunhofer CSE

  8. U.S. CHP Installations Incorporating Thermal Energy Storage (TES) and/or

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Turbine Inlet Cooling (TIC), September 2003 | Department of Energy CHP Installations Incorporating Thermal Energy Storage (TES) and/or Turbine Inlet Cooling (TIC), September 2003 U.S. CHP Installations Incorporating Thermal Energy Storage (TES) and/or Turbine Inlet Cooling (TIC), September 2003 This 2003 chart of U.S. CHP installations incorporating Thermal Energy Storage (TES) and/or Turbine Inlet Cooling (TIC) was prepared by the Cool Solutions Company of Lisle, Illinois, for UT-Battelle,

  9. Install Waste Heat Recovery Systems for Fuel-Fired Furnaces | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Waste Heat Recovery Systems for Fuel-Fired Furnaces Install Waste Heat Recovery Systems for Fuel-Fired Furnaces This tip sheet recommends installing waste heat recovery systems for fuel-fired furnaces to increase the energy efficiency of process heating systems. PROCESS HEATING TIP SHEET #8 Install Waste Heat Recovery Systems for Fuel-Fired Furnaces (September 2005) (280.81 KB) More Documents & Publications Load Preheating Using Flue Gases from a Fuel-Fired Heating System Using

  10. Design and Installation of a Disposal Cell Cover Field Test

    SciTech Connect (OSTI)

    Benson, C.H.; Waugh, W.J.; Albright, W.H.; Smith, G.M.; Bush, R.P.

    2011-02-27

    The U.S. Department of Energy’s Office of Legacy Management (LM) initiated a cover assessment project in September 2007 to evaluate an inexpensive approach to enhancing the hydrological performance of final covers for disposal cells. The objective is to accelerate and enhance natural processes that are transforming existing conventional covers, which rely on low-conductivity earthen barriers, into water balance covers, that store water in soil and release it as soil evaporation and plant transpiration. A low conductivity cover could be modified by deliberately blending the upper layers of the cover profile and planting native shrubs. A test facility was constructed at the Grand Junction, Colorado, Disposal Site to evaluate the proposed methodology. The test cover was constructed in two identical sections, each including a large drainage lysimeter. The test cover was constructed with the same design and using the same materials as the existing disposal cell in order to allow for a direct comparison of performance. One test section will be renovated using the proposed method; the other is a control. LM is using the lysimeters to evaluate the effectiveness of the renovation treatment by monitoring hydrologic conditions within the cover profile as well as all water entering and leaving the system. This paper describes the historical experience of final covers employing earthen barrier layers, the design and operation of the lysimeter test facility, testing conducted to characterize the as-built engineering and edaphic properties of the lysimeter soils, the calibration of instruments installed at the test facility, and monitoring data collected since the lysimeters were constructed.

  11. Preliminary assessment report for Bee Caves Armory (former Nike BG-80 Fire Control Facility), Installation 48055, Austin, Texas. Installation Restoration Program

    SciTech Connect (OSTI)

    Dennis, C.

    1993-08-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard (ARNG) property in Austin, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing, preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining, site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Bee Caves Armory property, the requirements of the Department of Defense Installation Restoration Program. Of concern is the potential for hazardous waste to be present on the property as a result of the former Nike Missile Base operations or in the form of original construction materials. Environmentally sensitive operations associated with the property from that period include (1) underground fuel storage, (2) hazardous materials storage/use, (3) disposal of hazardous waste and (4) release of hazardous waste water.

  12. Obama Administration Announces Plans to Install New Solar Panels on the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    White House Residence | Department of Energy Plans to Install New Solar Panels on the White House Residence Obama Administration Announces Plans to Install New Solar Panels on the White House Residence October 5, 2010 - 12:00am Addthis WASHINGTON - U.S. Energy Secretary Steven Chu and Council of Environmental Quality (CEQ) Chair Nancy Sutley today announced plans to install solar panels and a solar hot water heater on the roof of the White House Residence. These two solar installations will

  13. Federal Grant Fully Funds Small Turbine Installation at Maine Senior Housing Complex

    SciTech Connect (OSTI)

    2009-02-26

    Article on a federal Residential Energy Assistance Challenge grant that funded the installation of a small wind turbine at a retirement center.

  14. Final Report on the Nikolski Wind-Diesel Project Wind Installation

    Energy Savers [EERE]

    ... Nikolski Wind-Diesel Project; Wind Turbine Installation, 10142010 Provided by the ... application through a hot water storage and distribution system at the adjacent school. ...

  15. Characterization of the Installed Costs of Prime Movers Using Gaseous Opportunity Fuels, September 2007

    Broader source: Energy.gov [DOE]

    A report addendum and final white paper for the Characterization of the Installed Costs of Prime Movers Using Gaseous Opportunity Fuels

  16. Fuel Cell Installation Improves Reliability and Saves Energy at a Corporate Data Center

    SciTech Connect (OSTI)

    2002-05-01

    In 2002, Chevron Energy Solutions implemented a fuel cell installation project at the corporate data center of Chevron Texaco's corporate headquarters in San Ramon, California.

  17. A Homeowners Guide to Window Air Conditioner Installation for...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Window air conditioners (ACs) are an inexpensive alternative to central systems, and are ... The study showed that window AC installation resulted in signifcant air ...

  18. Savings Project: Install Exterior Storm Windows With Low-E Coating...

    Office of Environmental Management (EM)

    while keeping your home warm in the winter and cool in the summer. | Photo courtesy of Larson Manufacturing Company. Installing storm windows will lower your energy bill while...

  19. DOE 1.5 Installation Time Lapse Video (Text Version) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE 1.5 Installation Time Lapse Video (Text Version) DOE 1.5 Installation Time Lapse Video (Text Version) Below is the text version for the DOE 1.5 Installation Time Lapse Video. The National Renewable Energy Laboratory installs a 1.5-MW wind turbine for the U.S. Department of Energy at its National Wind Technology Center located just south of Boulder, Colorado. The construction site is a grassy field that overlooks the eastern plains of Colorado. Two blue construction cranes work together to

  20. Consider Installing Turbulators on Two- and Three-Pass Firetube Boilers

    SciTech Connect (OSTI)

    Not Available

    2006-01-01

    This revised ITP tip sheet on installing turbulators on firetube boilers provides how-to advice for improving the system using low-cost, proven practices and technologies.

  1. Consider Installing Turbulators on Two- and Three-Pass Firetube Boilers - Steam Tip Sheet #25

    SciTech Connect (OSTI)

    2012-01-01

    This revised AMO tip sheet on installing turbulators on firetube boilers provides how-to advice for improving the system using low-cost, proven practices and technologies.

  2. Consider Installing Turbulators on Two- and Three-Pass Firetube Boilers - Steam Tip Sheet #25

    SciTech Connect (OSTI)

    2006-01-01

    This revised AMO tip sheet on installing turbulators on firetube boilers provides how-to advice for improving the system using low-cost, proven practices and technologies.

  3. Decision support model for municipal solid waste recycling at United States Air Force Installations. Master`s thesis

    SciTech Connect (OSTI)

    Williams, G.A.

    1996-12-01

    The United States Air Force requires each installation to operate a municipal solid waste recycling program. Two inherently conflicting objectives, waste material diversion and financial result, have been established for the program. Reducing landfill disposal is the primary objective, but the incentive for profit is strong because each installation can retain profits from the program. Installations can be divided into two distinct areas, commercial and residential, based on the waste stream composition and funding. Structuring of the recycling program is often done in an ad-hoc manner. A decision support model was developed to evaluate four methods for each area. The model combines available Air Force data and information from research literature to determine the results of sixteen strategy combinations. The important variables affecting the results are determined through sensitivity analysis. The results are used to establish an efficient frontier of preferred strategies. The frontier illustrates the trade-offs of each strategy. The frontier can be also be used to inform decision makers prior to final strategy selection and determine preference values which would favor a given strategy. The value free analysis provides an objective foundation for presentation to a decision maker with unknown or changing preference values. The model provides valuable insight into the performance of recycling strategies as part of an overall waste management plan.

  4. EVALUATION OF TROQUE VS CLOSURE BOLT PRELOAD FOR A TYPICAL CONTAINMENT VESSEL UNDER SERVICE CONDITIONS

    SciTech Connect (OSTI)

    Smith, A.

    2010-02-16

    Radioactive material package containment vessels typically employ bolted closures of various configurations. Closure bolts must retain the lid of a package and must maintain required seal loads, while subjected to internal pressure, impact loads and vibration. The need for insuring that the specified preload is achieved in closure bolts for radioactive materials packagings has been a continual subject of concern for both designers and regulatory reviewers. The extensive literature on threaded fasteners provides sound guidance on design and torque specification for closure bolts. The literature also shows the uncertainty associated with use of torque to establish preload is typically between 10 and 35%. These studies have been performed under controlled, laboratory conditions. The ability to insure required preload in normal service is, consequently, an important question. The study described here investigated the relationship between indicated torque and resulting bolt load for a typical radioactive materials package closure using methods available under normal service conditions.

  5. Fact #906: January 4, 2016 VMT and the Price of Gasoline Typically Move in

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Opposition | Department of Energy 6: January 4, 2016 VMT and the Price of Gasoline Typically Move in Opposition Fact #906: January 4, 2016 VMT and the Price of Gasoline Typically Move in Opposition SUBSCRIBE to the Fact of the Week The prices of gasoline and diesel fuel affect the transportation sector in many ways. For example, fuel prices can impact the number of miles driven and affect the choices consumers make when purchasing vehicles. The graph below shows a three-month moving average

  6. Lessons Learned from Net Zero Energy Assessments and Renewable Energy Projects at Military Installations

    Office of Energy Efficiency and Renewable Energy (EERE)

    Report highlights the increase in resources, project speed, and scale required to achieve the U.S. Department of Defense (DoD) energy efficiency and renewable energy goals. It also summarizes the net zero energy installation assessment (NZEI) process and the lessons learned from NZEI assessments and large-scale renewable energy projects implementations at DoD installations.

  7. Lessons Learned from Net Zero Energy Assessments and Renewable Energy Projects at Military Installations

    SciTech Connect (OSTI)

    Callahan, M.; Anderson, K.; Booth, S.; Katz, J.; Tetreault, T.

    2011-09-01

    Report highlights the increase in resources, project speed, and scale that is required to achieve the U.S. Department of Defense (DoD) energy efficiency and renewable energy goals and summarizes the net zero energy installation assessment (NZEI) process and the lessons learned from NZEI assessments and large-scale renewable energy projects implementations at DoD installations.

  8. DEVELOPMENT, INSTALLATION AND OPERATION OF THE MPC&A OPERATIONS MONITORING (MOM) SYSTEM AT THE JOINT INSTITUTE FOR NUCLEAR RESEARCH (JINR) DUBNA, RUSSIA

    SciTech Connect (OSTI)

    Kartashov,V.V.; Pratt,W.; Romanov, Y.A.; Samoilov, V.N.; Shestakov, B.A.; Duncan, C.; Brownell, L.; Carbonaro, J.; White, R.M.; Coffing, J.A.

    2009-07-12

    The Material Protection, Control and Accounting (MPC&A) Operations Monitoring (MOM) systems handling at the International Intergovernmental Organization - Joint Institute for Nuclear Research (JINR) is described in this paper. Category I nuclear material (plutonium and uranium) is used in JINR research reactors, facilities and for scientific and research activities. A monitoring system (MOM) was installed at JINR in April 2003. The system design was based on a vulnerability analysis, which took into account the specifics of the Institute. The design and installation of the MOM system was a collaborative effort between JINR, Brookhaven National Laboratory (BNL) and the U.S. Department of Energy (DOE). Financial support was provided by DOE through BNL. The installed MOM system provides facility management with additional assurance that operations involving nuclear material (NM) are correctly followed by the facility personnel. The MOM system also provides additional confidence that the MPC&A systems continue to perform effectively.

  9. Final report : 2004 monitoring well installation and sampling at Centralia,Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.

    2006-02-08

    This document reports on monitoring well installation and sampling in 2004 at the location of a grain storage facility formerly operated in Centralia, Kansas, by the Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA). Argonne National Laboratory is conducting environmental investigations of carbon tetrachloride contamination in groundwater at this site for the CCC/USDA. With the approval of the Kansas Department of Health and Environment (KDHE), Argonne installed six monitoring wells at the former facility in July 2004 to supplement existing monitoring points (piezometers) installed during Argonne's Phase I investigation in 2002. Together, the monitoring wells and piezometers constitute a monitoring network designed to (1) confirm the lateral distribution of carbon tetrachloride in the groundwater, (2) track any migration of contaminants that might take place, and (3) monitor aquifer geochemical characteristics. To verify that the six new monitoring wells had been developed adequately, they were sampled after their installation in July 2004 for analysis for volatile organic compounds (VOCs). The monitoring wells were sampled again in August 2004, after a stabilization period of four weeks. Five of the Phase I piezometers were also sampled in August 2004. Results of analysis of the August 2004 groundwater samples for VOCs confirmed the Phase II investigation's findings (based on sampling in March and April 2003) that carbon tetrachloride contamination in groundwater is generally confined to the boundary of the former CCC/USDA facility. Little migration of contamination from the former facility has been evident. Nevertheless, the network of monitoring wells now in place may not be adequate to delineate the extent of the plume. Future expansion of the network will proceed per agreement between the CCC/USDA and the KDHE. The groundwater samples collected in August 2004 were also analyzed for attenuation parameters that are helpful in

  10. DEMONSTRATiON OF A SUBSURFACE CONTAINMENT SYSTEM FOR INSTALLATION AT DOE WASTE SITES

    SciTech Connect (OSTI)

    Thomas J. Crocker; Verna M. Carpenter

    2003-05-21

    Between 1952 and 1970, DOE buried mixed waste in pits and trenches that now have special cleanup needs. The disposal practices used decades ago left these landfills and other trenches, pits, and disposal sites filled with three million cubic meters of buried waste. This waste is becoming harmful to human safety and health. Today's cleanup and waste removal is time-consuming and expensive with some sites scheduled to complete cleanup by 2006 or later. An interim solution to the DOE buried waste problem is to encapsulate and hydraulically isolate the waste with a geomembrane barrier and monitor the performance of the barrier over its 50-yr lifetime. The installed containment barriers would isolate the buried waste and protect groundwater from pollutants until final remediations are completed. The DOE has awarded a contract to RAHCO International, Inc.; of Spokane, Washington; to design, develop, and test a novel subsurface barrier installation system, referred to as a Subsurface Containment System (SCS). The installed containment barrier consists of commercially available geomembrane materials that isolates the underground waste, similar to the way a swimming pools hold water, without disrupting hazardous material that was buried decades ago. The barrier protects soil and groundwater from contamination and effectively meets environmental cleanup standards while reducing risks, schedules, and costs. Constructing the subsurface containment barrier uses a combination of conventional and specialized equipment and a unique continuous construction process. This innovative equipment and construction method can construct a 1000-ft-long X 34-ft-wide X 30-ft-deep barrier at construction rates to 12 Wday (8 hr/day operation). Life cycle costs including RCRA cover and long-term monitoring range from approximately $380 to $590/cu yd of waste contained or $100 to $160/sq ft of placed barrier based upon the subsurface geology surrounding the waste. Project objectives for Phase I

  11. Installing and Commissioning a New Radioactive Waste Tracking System - Lessons Learned

    SciTech Connect (OSTI)

    Robert S. Anderson; Miklos Garamszeghy; Fred Rodrigues; Ed Nicholls

    2005-05-01

    Ontario Power Generation (OPG) recognizes the importance of information management particularly with regards to its low and intermediate level waste program. Various computer based waste tracking systems have been used in OPG since the 1980s. These systems tracked the physical receipt, processing, storage, and inventory of the waste. As OPG moved towards long-term management (e.g. disposal), it was recognized that tracking of more detailed waste characterization information was important. This required either substantial modification of the existing system to include a waste characterization module or replacing it entirely with a new system. After a detailed review of available options, it was decided that the existing waste tracking application would be replaced with the Idaho National Laboratory’s (INL) Integrated Waste Tracking System (IWTS). Installing and commissioning a system which must receive historical operational waste management information (data) and provide new features, required much more attention than was originally considered. The operational readiness of IWTS required extensive vetting and preparation of historic data (which itself had been created from multiple databases in varied formats) to ensure a consistent format for import of some 30,000-container records, and merging and linking these container records to a waste stream based characterization database. This paper will discuss some of the strengths and weaknesses contributing to project success or hindrance so that others can understand and minimize the difficulties inherent in a project of this magnitude.

  12. Energy Savings for Occupancy-Based Control (OBC) of Variable-Air-Volume (VAV) Systems

    SciTech Connect (OSTI)

    Zhang, Jian; Lutes, Robert G.; Liu, Guopeng; Brambley, Michael R.

    2013-01-24

    This study evaluates the savings potential of occupancy based control (OBC) for large office buildings with VAV terminal boxes installed.

  13. SunShot Initiative Installs Solar Energy System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SunShot Initiative Installs Solar Energy System SunShot Initiative Installs Solar Energy System Addthis 1 of 10 SunShot Initiative team members install a solar energy system on a Habitat for Humanity home in Washington, D.C. on Friday, September 19. The project was organized by GRID Alternatives, the nation's largest solar non-profit organization, as part of a two-day event to bring solar power to underserved communities. Image: Jamie Nolan 2 of 10 A volunteer from the SunShot Initiative helps

  14. Instructions for Installing the Excel Solver Add-In | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Instructions for Installing the Excel Solver Add-In Instructions for Installing the Excel Solver Add-In First check to determine if Solver is already installed by clicking on 'Tools' on the main EXCEL toolbar and then on 'Add-Ins' on the dropdown menu, as indicated in figure 1 below. A screen shot of the GETEM Excel spreadsheet showing the action of clicking on 'Tools' on the main EXCEL toolbar and then on 'Add-Ins' on the subsequent dropdown menu. The window shown in figure 2 will open and the

  15. Largest Solar Panel Installation at a U.S. University Goes Live |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Largest Solar Panel Installation at a U.S. University Goes Live Largest Solar Panel Installation at a U.S. University Goes Live November 4, 2010 - 6:10pm Addthis Sen. Menendez, Rep. Pascrell, John Lushetsky and other officials at the ribbon cutting. Sen. Menendez, Rep. Pascrell, John Lushetsky and other officials at the ribbon cutting. A couple of weeks ago, I had the opportunity to participate in a ribbon cutting event for the largest solar installation on a United

  16. Y-12 to Install New Fence to Reduce Trespassing | Y-12 National Security

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complex to Install New Fence ... Y-12 to Install New Fence to Reduce Trespassing Posted: April 23, 2013 - 3:56pm New fence to be installed by April 4 The National Nuclear Security Administration today announced plans to extend the boundary fence at the Y-12 National Security Complex along Scarboro Road. The new fence is expected to be in place by April 4. The fence is being erected primarily to restrict public access to U.S. Government property in front of the entrance sign and along the

  17. So You Want to Go Solar? 3 Things to Consider When Installing Solar Power

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    at Home | Department of Energy So You Want to Go Solar? 3 Things to Consider When Installing Solar Power at Home So You Want to Go Solar? 3 Things to Consider When Installing Solar Power at Home October 3, 2014 - 12:37pm Q&A What do you want to know about solar energy at home? Tell Us Addthis Installing solar panels requires the proper orientation and tilt, and it is best to use a professional contractor. | Photo courtesy of Dennis Schroeder, National Renewable Energy Laboratory

  18. SunShot Installs Solar Energy System on Local Habitat for Humanity Home |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy SunShot Installs Solar Energy System on Local Habitat for Humanity Home SunShot Installs Solar Energy System on Local Habitat for Humanity Home September 22, 2014 - 5:10pm Addthis 1 of 10 SunShot Initiative team members install a solar energy system on a Habitat for Humanity home in Washington, D.C. on Friday, September 19. The project was organized by GRID Alternatives, the nation's largest solar non-profit organization, as part of a two-day event to bring solar power

  19. Deadline for Submitting Comments to the Second Installment of the QER Is

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    July 1 | Department of Energy Deadline for Submitting Comments to the Second Installment of the QER Is July 1 Deadline for Submitting Comments to the Second Installment of the QER Is July 1 June 22, 2016 - 1:25pm Addthis If you haven't submitted comments yet to the second installment of the Quadrennial Energy Review, you only have a few days left to do so. The deadline for submitting comments is July 1, 2016 - less than two weeks away. The Quadrennial Energy Review (QER) process, which has

  20. Case histories portraying different methods of installing liners for verticle barriers

    SciTech Connect (OSTI)

    Burke, G.K.; Crockford, R.M.; Achhorner, F.N.

    1997-12-31

    The installation of liners for vertical barriers is difficult and has been a learning experience for every contractor making the attempt. Soil stratigraphy and hydrogeologic conditions can vary over short distances, creating a variety of problems. This is particularly so when working near landfills and documentation of the as-built condition is poor. Successful installation requires detailed planning and knowledge of what to expect, as well as alternate plans for potential problems. Several successful methods of panel connection will be presented as well as a variety of installation techniques. Project case histories will be reviewed, highlighting the challenges associated with specific construction techniques.

  1. Study of multiband disordered systems using the typical medium dynamical cluster approximation

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Zhang, Yi; Terletska, Hanna; Moore, C.; Ekuma, Chinedu; Tam, Ka-Ming; Berlijn, Tom; Ku, Wei; Moreno, Juana; Jarrell, Mark

    2015-11-06

    We generalize the typical medium dynamical cluster approximation to multiband disordered systems. Using our extended formalism, we perform a systematic study of the nonlocal correlation effects induced by disorder on the density of states and the mobility edge of the three-dimensional two-band Anderson model. We include interband and intraband hopping and an intraband disorder potential. Our results are consistent with those obtained by the transfer matrix and the kernel polynomial methods. We also apply the method to KxFe2-ySe2 with Fe vacancies. Despite the strong vacancy disorder and anisotropy, we find the material is not an Anderson insulator. Moreover our resultsmore » demonstrate the application of the typical medium dynamical cluster approximation method to study Anderson localization in real materials.« less

  2. Study of multiband disordered systems using the typical medium dynamical cluster approximation

    SciTech Connect (OSTI)

    Zhang, Yi; Terletska, Hanna; Moore, C.; Ekuma, Chinedu; Tam, Ka-Ming; Berlijn, Tom; Ku, Wei; Moreno, Juana; Jarrell, Mark

    2015-11-06

    We generalize the typical medium dynamical cluster approximation to multiband disordered systems. Using our extended formalism, we perform a systematic study of the nonlocal correlation effects induced by disorder on the density of states and the mobility edge of the three-dimensional two-band Anderson model. We include interband and intraband hopping and an intraband disorder potential. Our results are consistent with those obtained by the transfer matrix and the kernel polynomial methods. We also apply the method to KxFe2-ySe2 with Fe vacancies. Despite the strong vacancy disorder and anisotropy, we find the material is not an Anderson insulator. Moreover our results demonstrate the application of the typical medium dynamical cluster approximation method to study Anderson localization in real materials.

  3. Machinery monitoring system installed at nuclear power station

    SciTech Connect (OSTI)

    Piety, K.; Hamrick, L.; McCurdy, A.

    1981-10-01

    The Grand Gulf Nuclear Station under construction in Mississippi will have a computer-based system to monitor 300 process variables and 200 vibration signals in each of the two units. The system's functions include monitoring support, startup/shutdown, surveillance, and diagnostics. The tasks associated with machinery monitoring are broken down into the initial plant design, construction and startup testing, and power-operation phases. The value of this monitoring is discussed and summarized in a table showing the impact of component failure on plant availability. 4 figures, 3 tables. (DCK)

  4. Consider Installing High-Pressure Boilers with Backpressure Turbine-Generators

    SciTech Connect (OSTI)

    Not Available

    2006-01-01

    This revised ITP tip sheet on installing high-pressure boilers provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  5. Building-Integrated Photovoltaics (BIPV) in the Residential Section: An Analysis of Installed Rooftop Prices (Presentation)

    SciTech Connect (OSTI)

    James, T.; Goodrich, A.; Woodhouse, M.; Margolis, R.; Ong, S.

    2012-06-01

    This powerpoint presentation to be presented at the World Renewable Energy Forum on May 17, 2012, in Denver, CO, discusses building-integrated photovoltaics (BIPV) in the residential section and includes an analysis of installed rooftop prices.

  6. Monitoring and Mitigation Alternatives for Protection of North Atlantic Right Whales during Offshore Wind Farm Installation

    SciTech Connect (OSTI)

    Carlson, Thomas J.; Halvorsen, Michele B.; Matzner, Shari; Copping, Andrea E.; Stavole, Jessica

    2012-09-01

    Progress report on defining and determining monitoring and mitigation measures for protecting North Atlantic Right Whales from the effects of pile driving and other activities associated with installation of offshore wind farms.

  7. Plug and Play: Purchase, Install, and Connect Residential Solar Power in Hours

    Broader source: Energy.gov [DOE]

    Consumers may soon have the option of purchasing a do-it-yourself rooftop solar photovoltaic (PV) system at their local home improvement store that can be installed and connected to the grid in...

  8. BUILDOUT AND UPGRADE OF CENTRAL EMERGENCY GENERATOR SYSTEM, GENERATOR 3 AND 4 ELECTRICAL INSTALLATION

    SciTech Connect (OSTI)

    Gary D. Seifert; G. Shawn West; Kurt S. Myers; Jim Moncur

    2006-07-01

    SECTION 01000—SUMMARY OF WORK PART 1—GENERAL 1.1 SUMMARY The work to be performed under this project consists of providing the labor, equipment, and materials to perform "Buildout and Upgrade of Central Emergency Generator System, Generator 3 and 4 Electrical Installation" for the National Aeronautics and Space Administration at the Dryden Flight Research Center (NASA/DFRC), Edwards, California 93523. All modifications to existing substations and electrical distribution systems are the responsibility of the contractor. It is the contractor’s responsibility to supply a complete and functionally operational system. The work shall be performed in accordance with these specifications and the related drawings. The work of this project is defined by the plans and specifications contained and referenced herein. This work specifically includes but is not limited to the following: Scope of Work - Installation 1. Install all electrical wiring and controls for new generators 3 and 4 to match existing electrical installation for generators 1 and 2 and in accordance with drawings. Contractor shall provide as-built details for electrical installation. 2. Install battery charger systems for new generators 3 and 4 to match existing battery charging equipment and installation for generators 1 and 2. This may require exchange of some battery charger parts already on-hand. Supply power to new battery chargers from panel and breakers as shown on drawings. Utilize existing conduits already routed to generators 3 and 4 to field route the new wiring in the most reasonable way possible. 3. Install electrical wiring for fuel/lube systems for new generators 3 and 4 to match existing installation for generators 1 and 2. Supply power to lube oil heaters and fuel system (day tanks) from panel and breakers as shown on drawings. Utilize existing conduits already routed to generators 3 and 4 to field route the new wiring in the most reasonable way possible. Add any conduits necessary to

  9. Mira: Installation of our Blue Gene/Q | Argonne Leadership Computing...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Installation of our Blue GeneQ The Argonne Leadership Computing Facility (ALCF) started deployment of Mira in January 2012 with the delivery of two single-rack systems. By early...

  10. Install Removable Insulation on Valves and Fittings - Steam Tip Sheet #17

    SciTech Connect (OSTI)

    2012-01-01

    This revised AMO tip sheet on installing removable insulation on valves and fittings provides how-to advice for improving the system using low-cost, proven practices and technologies.

  11. Consider Installing High-Pressure Boilers with Backpressure Turbine-Generators - Steam Tip Sheet #22

    SciTech Connect (OSTI)

    2012-01-01

    This revised AMO tip sheet on installing high-pressure boilers provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  12. Making the Connection: Beneficial Collaboration Between Army Installations and Energy Utility Companies

    Broader source: Energy.gov [DOE]

    Presentation—given at the Fall 2011 Federal Utility Partnership Working Group (FUPWG) meeting—covers a RAND study to develop recommendations for improving Army installation collaboration with utilities to reduce traditional energy usage.

  13. H.A.R. 19-105 - Accommodation and Installation of Utilities on...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: H.A.R. 19-105 - Accommodation and Installation of Utilities on State Highways and Federal Aid...

  14. Net Zero Energy Military Installations: A Guide to Assessment and Planning

    SciTech Connect (OSTI)

    Booth, S.; Barnett, J.; Burman, K.; Hambrick, J.; Westby, R.

    2010-08-01

    The U.S. Department of Defense (DoD) recognizes the strategic importance of energy to its mission, and is working to reduce energy consumption and enhance energy self-sufficiency by drawing on local clean energy sources. A joint initiative formed between DoD and the U.S. Department of Energy (DOE) in 2008 to address military energy use led to a task force to examine the potential for net zero energy military installations, which would produce as much energy on site as they consume in buildings, facilities, and fleet vehicles. This report presents an assessment and planning process to examine military installations for net zero energy potential. Net Zero Energy Installation Assessment (NZEIA) presents a systematic framework to analyze energy projects at installations while balancing other site priorities such as mission, cost, and security.

  15. PSE&G- Government and Non-Profit Facility Direct Install Efficiency Program

    Broader source: Energy.gov [DOE]

    The PSE&G Direct Install Program provides an energy audit and recommended efficiency upgrades at 100% at up front costs, while requiring the participants to repay 20% of the covered cost over...

  16. SMART Wind Consortium Virtual Meeting on Installation: Reducing Electrical and Foundation Costs

    Broader source: Energy.gov [DOE]

    This 90-minute SMART Wind Consortium virtual meeting is intended to foster dialogue on actions to improve safety and efficiency and to reduce installation costs for distributed wind turbines. Gary...

  17. Million Solar Strong: U.S. Hits Millionth Solar Energy Installation

    Broader source: Energy.gov [DOE]

    Today GreenTech Media announced that the U.S. solar energy industry passed 1 million installations sometime around the end of February. This news comes as solar continues to represent a major and...

  18. Y-12 to Install New Fence to Reduce Trespassing | National Nuclear...

    National Nuclear Security Administration (NNSA)

    to Install New Fence to Reduce Trespassing March 28, 2013 The National Nuclear Security ... Security Complex along Scarboro Road. The new fence is expected to be in place by April ...

  19. 01-07-1998 - New Product Chemically Eliminates Asbestos in Installed

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fireproofing | The Ames Laboratory 8 - New Product Chemically Eliminates Asbestos in Installed Fireproofing Document Number: NA Effective Date: 01/1998 File (public): PDF icon 01-07-1998_green_alert.pdf Lessons Learned Type: Green

  20. Generic TriBITS Project, Build, Test, and Install Reference Guide

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Generic TriBITS Project, Build, Test, and Install Reference Guide Author: Roscoe A. Bartlett Contact: bartlett.roscoe@gmail.com Date: 2015-08-27 Version: tribitsstart-1317-g4908e4...

  1. ITP Industrial Distributed Energy: Database of U.S. CHP Installations...

    Office of Environmental Management (EM)

    Database of U.S. CHP Installations Incorporating Prepared for: UT-Battelle, Oak Ridge National Laboratory sheet 1 of 5 Thermal Energy Storage (TES) andor Turbine Inlet Cooling ...

  2. Install Waste Heat Recovery Systems for Fuel-Fired Furnaces (English/Chinese) (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2011-10-01

    Chinese translation of ITP fact sheet about installing Waste Heat Recovery Systems for Fuel-Fired Furnaces. For most fuel-fired heating equipment, a large amount of the heat supplied is wasted as exhaust or flue gases. In furnaces, air and fuel are mixed and burned to generate heat, some of which is transferred to the heating device and its load. When the heat transfer reaches its practical limit, the spent combustion gases are removed from the furnace via a flue or stack. At this point, these gases still hold considerable thermal energy. In many systems, this is the greatest single heat loss. The energy efficiency can often be increased by using waste heat gas recovery systems to capture and use some of the energy in the flue gas. For natural gas-based systems, the amount of heat contained in the flue gases as a percentage of the heat input in a heating system can be estimated by using Figure 1. Exhaust gas loss or waste heat depends on flue gas temperature and its mass flow, or in practical terms, excess air resulting from combustion air supply and air leakage into the furnace. The excess air can be estimated by measuring oxygen percentage in the flue gases.

  3. Brooklyn Union`s award-winning phosphoric-acid fuel cell installation

    SciTech Connect (OSTI)

    Berry, C.

    1996-03-01

    Brooklyn Union has been involved with the development of commercial fuel cells since the late 1960s. In the early 1990`s, the ONSI Corporation began a limited first-of-its-kind production run of a 200-kW system. ONSI`s Model PC-25 remains the only commercially available on-site fuel cell system. Brooklyn Union is currently operating a PC-25 at St. Vincent`s Medical Center in Staten Island, NY. In December of 1989, Brooklyn Union signed a contract with ONSI for the purchase of one of the first PC-25s. Installation of this unit began in September 1992, and the system went on line in October. The system is operating at an electrical efficiency of 36.8% (based on higher heating value) with a combined thermal/electrical efficiency of nearly 71.5%. The thermal output of the fuel cell is being used for the production of domestic hot water for use in the hospital`s laundry. This paper describes the system and its performances to date.

  4. Installation of reactive metals groundwater collection and treatment systems

    SciTech Connect (OSTI)

    Hopkins, J.K.; Primrose, A.L.; Vogan, J.; Uhland, J.

    1998-07-01

    Three groundwater plumes contaminated with volatile organic compounds (VOCs) and radionuclides at the Rocky Flats Environmental Technology Site are scheduled for remediation by 1999 based on the Rocky Flats Cleanup Agreement (RFCA) (DOE, 1996). These three plumes are among the top 20 environmental cleanup sites at Rocky Flats. One of these plumes, the Mound Site Plume, is derived from a previous drum storage area, and daylights as seeps near the South Walnut Creek drainage. Final design for remediation of the Mound Site Plume has been completed based on use of reactive metals to treat the contaminated groundwater, and construction is scheduled for early 1998. The two other plumes, the 903 Pad/Ryan`s Pit and the East Trenches Plumes, are derived from VOCs either from drums that leaked or that were disposed of in trenches. These two plumes are undergoing characterization and conceptual design in 1998 and construction is scheduled in 1999. The contaminants of concern in these plumes are tetrachloroethene, trichloroethene, carbon tetrachloride and low levels of uranium and americium.

  5. NREL Reports Soft Costs Now Largest Piece of Solar Installation Total Cost

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    - News Releases | NREL Reports Soft Costs Now Largest Piece of Solar Installation Total Cost December 2, 2013 Two detailed reports from the Energy Department's National Renewable Energy Laboratory (NREL) find that solar financing and other non-hardware costs - often referred to as "soft costs" - now comprise up to 64% of the total price of residential solar energy systems, reflecting how soft costs are becoming an increasingly larger fraction of the cost of installing solar.

  6. Energy Saving "Cool Roofs" Installed at Y-12 | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration | (NNSA) Energy Saving "Cool Roofs" Installed at Y-12 October 17, 2012 The Y-12 National Security Complex has taken additional steps to reduce its energy costs by installing almost 100,000 square feet of new heat reflective "cool" roofs at the Oak Ridge, Tennessee facility. File 2012-10-17 NPO Y-12 Cool Roofs.docx

  7. Installation Of Service Connections For Sensors Or Transmitters In Buried Water Pipes

    DOE Patents [OSTI]

    Burnham, Alan K.; Cooper, John F.

    2006-02-21

    A system for installing warning units in a buried pipeline. A small hole is drilled in the ground to the pipeline. A collar is affixed to one of the pipes of the pipeline. A valve with an internal passage is connected to the collar. A hole is drilled in the pipe. A warning unit is installed in the pipe by moving the warning unit through the internal passage, the collar, and the hole in the pipe.

  8. Net Zero Energy Military Installations: A Guide to Assessment and Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Net Zero Energy Military Installations: A Guide to Assessment and Planning Samuel Booth, John Barnett, Kari Burman, Josh Hambrick and Robert Westby Technical Report NREL/TP-7A2-48876 August 2010 Technical Report Net Zero Energy Military NREL/TP-7A2-48876 Installations: A Guide to August 2010 Assessment and Planning Samuel Booth, John Barnett, Kari Burman, Josh Hambrick and Robert Westby Prepared under Task No. IDOD.1010 National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado

  9. Five Million Smart Meters Installed Nationwide is Just the Beginning of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Smart Grid Progress | Department of Energy Million Smart Meters Installed Nationwide is Just the Beginning of Smart Grid Progress Five Million Smart Meters Installed Nationwide is Just the Beginning of Smart Grid Progress June 13, 2011 - 1:55pm Addthis A 21st Century Grid includes increasing the overall efficiency of our generating, transmission and distribution system to facilitate the growth of renewable energy sources. | Energy Department Image A 21st Century Grid includes increasing the

  10. H2-Assisted NOx Traps: Test Cell Results Vehicle Installations | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy -Assisted NOx Traps: Test Cell Results Vehicle Installations H2-Assisted NOx Traps: Test Cell Results Vehicle Installations 2003 DEER Conference Presentation: ArvinMeritor 2003_deer_crane.pdf (630.37 KB) More Documents & Publications Hydrogen generation from plasmatron reformers and use for diesel exhaust aftertreatment On-Board Ammonia Generation Using Delphi Diesel Fuel Reformer Use of a Diesel Fuel Processor for Rapid and Efficient Regeneration of Single Leg NOx Adsorber

  11. Facility Energy Decision System (FEDS) Assessment Report for US Army Garrison, Japan - Honshu Installations

    SciTech Connect (OSTI)

    Kora, Angela R.; Brown, Daryl R.; Dixon, Douglas R.

    2010-03-09

    This report documents an assessment was performed by a team of engineers from Pacific Northwest National Laboratory (PNNL) under contract to the Installation Management Command (IMCOM) Pacific Region Office (PARO). The effort used the Facility Energy Decision System (FEDS) model to determine how energy is consumed at five U.S. Army Garrison-Japan (USAG-J) installations in the Honshu area, identify the most cost-effective energy retrofit measures, and calculate the potential energy and cost savings.

  12. Weatherization Installer/Technician Fundamentals 2.0 - Dense Pack Sidewall

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Insulation | Department of Energy Dense Pack Sidewall Insulation Weatherization Installer/Technician Fundamentals 2.0 - Dense Pack Sidewall Insulation Dense Pack Sidewall Insulation - Complete (10.56 MB) Lesson Plan: Dense Pack Sidewall Insulation (126.47 KB) PowerPoint: Dense Pack Sidewall Insulation (10.92 MB) More Documents & Publications Energy Auditor - Single Family 2.0: Building Shell Retrofit Strategies Weatherization Installer/Technician Fundamentals 2.0 - Identifying and Air

  13. Permitting Best Practices Make Installing Solar Easier: Technical Assistance (Fact Sheet), NREL (National Renewable Energy Laboratory)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Compliance with the following permit will allow the installation and operation of electric vehicle charging equipment at a residence in the City, State jurisdiction. This permit addresses one of the following situations: Only an additional branch circuit would be added at the residence A hard-wired charging station would be installed at the residence. The attached requirements for wiring the charging station are taken directly out of the 2011 edition of the National Electrical Code (NEC) NFPA

  14. Analysis of Installed Measures and Energy Savings for Single-Family Residential Better Buildings Projects

    SciTech Connect (OSTI)

    Heaney, M.; Polly, B.

    2015-04-30

    This report presents an analysis of data for residential single-family projects reported by 37 organizations that were awarded federal financial assistance (cooperative agreements or grants) by the U.S. Department of Energy’s Better Buildings Neighborhood Program.1 The report characterizes the energy-efficiency measures installed for single-family residential projects and analyzes energy savings and savings prediction accuracy for measures installed in a subset of those projects.

  15. Certification for Small Wind Turbine Installers: What's the Hang Up?; Preprint

    SciTech Connect (OSTI)

    Oteri, F.; Sinclair, K.

    2012-03-01

    Several programs have been implemented to support the advancement of a professional, mature small wind industry and to ensure that this industry moves forward in a sustainable direction. The development of a standard for small wind turbine systems and the creation of the Small Wind Certification Council support small wind technology that is reliable and safe. Consumers and incentive programs will ultimately rely on certification to differentiate among systems sold in the U.S. market. Certification of small wind installers is yet another component deemed necessary for this industry to expand. The National Renewable Energy Laboratory, under the guidance and funding support of the U.S. Department of Energy, supported the development of small wind system installer certification provided via the North American Board of Certified Energy Practitioners. However, the small wind community is not supportive of the installer certification. There are currently only nine certified installers in the U.S. pool. This paper provides an overview of the installer certification program and why more small wind turbine installers are not pursuing this certification.

  16. Literature review : reducing soft costs of rooftop solar installations attributed to structural considerations.

    SciTech Connect (OSTI)

    Dwyer, Stephen F.

    2013-03-01

    Typical engineering methods utilized to calculate stresses on a roof structure involve simplifying assumptions that render a complex non-linear structure a simple and basic determinate beam. That is, instead of considering the composite action of the entire roof structure, the engineer evaluates only a single beam that is deemed conservatively to represent an affected rafter or top chord of a truss. This simplification based on assumptions of a complex problem is where significant conservatism can be introduced. Empirical data will be developed to evaluate this issue. Simple wood beams will be tested to failure. More complex and complete sections of roof structures that include composite action will also be tested to failure. The results can then be compared. An initial step in this process involves a literature review of any work that has been performed on roof structure composite action. The following section summarizes the literature review that was completed.

  17. Installing a HDPE vertical containment and collection system in one pass utilizing a deep trencher

    SciTech Connect (OSTI)

    Bocchino, W.M.; Burson, B.

    1997-12-31

    A unique method has been developed to install high density polyethylene (HDPE) vertical containment panels and a horizontal collection system for the containment and collection of contaminated groundwater. Unlike other means of creating this type of system, this barrier wall and collection system is installed in one step and in one narrow trench, utilizing a one-pass deep trencher. Originally HDPE vertical barriers were installed using conventional slurry trenching techniques. Use of this method raised questions of trench stability and disposal costs for the trench spoils. In addition, if a collection system was desired, a separate trench or vertical wells were required. In response to these concerns, a trenchless vibratory installation method was developed. Although this method addressed the concerns of trench stability and disposal costs, it raised a whole new set of concerns dealing with drivable soil conditions, buried debris and obstructions. Again, if a collection system was desired, a separate trench or vertical wells had to be installed. The latest development, the one-pass, deep trencher, has eliminated or significantly reduced the previously discussed construction concerns. The trencher methods reduce the amount of spoils generated because a trench width of 61 cm (24 inches) is constantly maintained by the machine. Additionally, soil classification and density are not as critical as with a vibratory installation. This is due to the trencher`s ability to trench in all but the hardest of materials (blow counts exceeding 35 blows/ft). Finally, the cost to add a collection system adjacent to the cutoff wall is substantially reduced and is limited only to the cost of the additional hydraulic fill and 4 inches HDPE collection piping. The trench itself is already constructed with the installation of the wall.

  18. Final Technical Report: Development of Post‐Installation Monitoring Capabilities

    SciTech Connect (OSTI)

    Polagye, Brian

    2014-03-31

    colonization of the subsea base support structure. In support of these plans, the project team developed and field tested a strobe‐illuminated stereooptical camera system suitable for studying near‐turbine interactions with marine animals. The camera system underwent short‐term field testing at the proposed turbine deployment site and a multi‐month endurance test in shallower water to evaluate the effectiveness of biofouling mitigation measures for the optical ports on camera and strobe pressure housings. These tests demonstrated that the camera system is likely to meet the objectives of the near‐turbine monitoring plan and operate, without maintenance, for periods of at least three months. The project team also advanced monitoring capabilities related to passive acoustic monitoring of marine mammals and monitoring of tidal currents. These capabilities will be integrated in a recoverable monitoring package that has a single interface point with the OpenHydro turbines, connects to shore power and data via a wet‐mate connector, and can be recovered to the surface for maintenance and reconfiguration independent of the turbine. A logical next step would be to integrate these instruments within the package, such that one instrument can trigger the operation of another.

  19. Recycling and processing of several typical crosslinked polymer scraps with enhanced mechanical properties based on solid-state mechanochemical milling

    SciTech Connect (OSTI)

    Lu, Canhui; Zhang, Xinxing; Zhang, Wei

    2015-05-22

    The partially devulcanization or de-crosslinking of ground tire rubber (GTR), post-vulcanized fluororubber scraps and crosslinked polyethylene from cable scraps through high-shear mechanochemical milling (HSMM) was conducted by a modified solid-state mechanochemical reactor. The results indicated that the HSMM treated crosslinked polymer scraps can be reprocessed as virgin rubbers or thermoplastics to produce materials with high performance. The foamed composites of low density polyethylene/GTR and the blend of post-vulcanized flurorubber (FKM) with polyacrylate rubber (ACM) with better processability and mechanical properties were obtained. The morphology observation showed that the dispersion and compatibility between de-crosslinked polymer scraps and matrix were enhanced. The results demonstrated that HSMM is a feasible alternative technology for recycling post-vulcanized or crosslinked polymer scraps.

  20. Design criteria for an independent spent fuel storage installation (water pool type)

    SciTech Connect (OSTI)

    Not Available

    1981-01-01

    This standard is intended to be used by those involved in the ownership and operation of an Independent Spent Fuel Storage Installation (ISFSI) in specifying the design requirements and by the designer in meeting the minimum design requirements of such installations. This standard continues the set of American National Standards on spent fuel storage design. Similar standards are: Design Objectives for Light Water Reactor Spent Fuel Storage Facilities at Nuclear Power Stations, N210-1976 (ANS-57.2); Design Objectives for Highly Radioactive Solid Material Handling and Storage Facilities in a Reprocessing Plant, ANSI N305-1975; and Guidelines for Evaluating Site-Related Parameters for an Independent Spent Fuel Storage Installation, ANSI/ANS-2.19-1981.

  1. Maximizing the Value of Photovoltaic Installations on Schools in California: Choosing the Best Electricity Rates

    SciTech Connect (OSTI)

    Ong, S.; Denholm, P.

    2011-07-01

    Schools in California often have a choice between multiple electricity rate options. For schools with photovoltaic (PV) installations, choosing the right rate is essential to maximize the value of PV generation. The rate option that minimizes a school?s electricity expenses often does not remain the most economical choice after the school installs a PV system. The complex interaction between PV generation, building load, and rate structure makes determining the best rate a challenging task. This report evaluates 22 rate structures across three of California?s largest electric utilities--Pacific Gas and Electric Co. (PG&E), Southern California Edison (SCE), and San Diego Gas and Electric (SDG&E)--in order to identify common rate structure attributes that are favorable to PV installations.

  2. Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility

    SciTech Connect (OSTI)

    Jack Q. Richardson

    2012-06-28

    Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project cost match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.

  3. Failure of zinc-plated self-tapping screws and Belleville washers used to install spoiler bars in cast iron dryers

    SciTech Connect (OSTI)

    Bruscato, R.M.; Herro, H.M.

    1999-07-01

    During a routine internal inspection of 39 dryers containing spoiler bars, hundreds of broken self-tapping screws used to install those bars were found. Many other screws, as well as many Belleville washers, which spring load the bar assembly against the shell, were found to be severely cracked. The spoiler bar system had been in service for 27 months. Fortunately, none of the bars had broken loose inside the dryers. Failures were the result of hydrogen embrittlement which produced the cracking. Hydrogen was produced by a galvanic corrosion cell established between the zinc plating and the hardened washers and hardened self-tapping screws. Minor chemical/pH upset conditions typical in paper mill steam systems may have accelerated the activity of the galvanic cell. This, in turn, enhanced the evolution of hydrogen. Once the zinc was consumed, hydrogen evolution ceased, and the driving force for cracking was eliminated.

  4. Installation of soft X-ray array diagnostics and its application to tomography reconstruction using synthetic KSTAR X-ray images

    SciTech Connect (OSTI)

    Lee, Seung Hun; Jang, Juhyeok; Hong, Joohwan; Jang, Siwon; Choe, Wonho; Pacella, D.; Romano, A.; Gabellieri, L.; Kim, Junghee

    2014-11-15

    Four-array system of soft X-ray diagnostics was installed on KSTAR tokamak. Each array has 32 viewing chords of two photo-diode array detectors with spatial resolution of 2 cm. To estimate signals from the soft X-ray radiation power, typical n{sub e}, T{sub e}, and argon impurity line radiation profiles in KSTAR are chosen. The photo-diodes were absolutely calibrated as a function of the incident photon energy in 2–40 keV range with a portable X-ray tube. Two-dimensional T{sub e} image properties by multi-energy method were simulated and visualized with six combinations of beryllium filter sets within the dynamic range of signal ratio.

  5. Waste-to-Energy Projects at Army Installations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Projects at Army Installations Waste-to-Energy Projects at Army Installations Presentation by Franklin H. Holcomb, U.S. Army ERDC-CERL, at the DOE-DOD Waste-to-Energy using Fuel Cells Workshop held Jan. 13, 2011 waste_holcomb.pdf (2.81 MB) More Documents & Publications Report of the DOD-DOE Workshop on Converting Waste to Energy Using Fuel Cells: Workshop Summary and Action Plan Net Zero Waste - Tools and Technical Support ...and other observations DOD -DOE MOU WTE Using Fuel Cells Briefing

  6. EERE Success Story-Measuring the Impact of Tidal Power Installations on

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Endangered Beluga Whales | Department of Energy Measuring the Impact of Tidal Power Installations on Endangered Beluga Whales EERE Success Story-Measuring the Impact of Tidal Power Installations on Endangered Beluga Whales April 9, 2013 - 12:00am Addthis With EERE support, Ocean Renewable Power Company (ORPC) is conducting a two-year study on the effects of tidal turbines on endangered beluga whales in Cook Inlet, Alaska-home to some of the greatest tidal energy potential in the United

  7. Generic TriBITS PRoject, Build, Test, and Install Quick Reference Guide

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Generic TriBITS PRoject, Build, Test, and Install Quick Reference Guide Ross Bartlett Oak Ridge National Laboratory CASL-U-2014-0075-000-a CASL-U-2014-0075-000-a Generic TriBITS PRoject, Build, Test, and Install Quick Reference Guide Author: Roscoe A. Bartlett Contact: bartlett.roscoe@gmail.com Abstract This document is generated from the generic template body docu- ment TribitsBuildQickRefBody.rst and provides a general project- independent quick reference on how to configure, build, test, and

  8. First U.S. Grid-Connected Offshore Wind Turbine Installed Off the Coast of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Maine | Department of Energy First U.S. Grid-Connected Offshore Wind Turbine Installed Off the Coast of Maine First U.S. Grid-Connected Offshore Wind Turbine Installed Off the Coast of Maine October 1, 2013 - 12:33pm Addthis This is an excerpt from the Third Quarter 2013 edition of the Wind Program R&D Newsletter. A 65-foot tall, 20-kilowatt wind turbine with a white rotor and a yellow tower on a floating platform in the ocean. Castine, Maine - On May 31, 2013, the University of Maine's

  9. Energy Department Launches SunShot Prize Competition to Install Solar

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Systems at a Fraction of Today's Price | Department of Energy SunShot Prize Competition to Install Solar Energy Systems at a Fraction of Today's Price Energy Department Launches SunShot Prize Competition to Install Solar Energy Systems at a Fraction of Today's Price September 12, 2012 - 2:27pm Addthis News Media Contact (202) 586-4940 WASHINGTON - As part of the Energy Department's SunShot Initiative, which is working to make solar energy competitive with other forms of energy without

  10. Installation Status of the Electron Beam Profiler for the Fermilab Main Injector

    SciTech Connect (OSTI)

    Thurman-Keup, R.; Alvarez, M.; Fitzgerald, J.; Lundberg, C.; Prieto, P.; Roberts, M.; Zagel, J.; Blokland, W.

    2015-11-06

    The planned neutrino program at Fermilab requires large proton beam intensities in excess of 2 MW. Measuring the transverse profiles of these high intensity beams is challenging and often depends on non-invasive techniques. One such technique involves measuring the deflection of a probe beam of electrons with a trajectory perpendicular to the proton beam. A device such as this is already in use at the Spallation Neutron Source at ORNL and the installation of a similar device is underway in the Main Injector at Fermilab. The present installation status of the electron beam profiler for the Main Injector will be discussed together with some simulations and test stand results.

  11. QER SECOND INSTALLMENT REGIONAL MEETING--BOSTON, MA | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BOSTON, MA QER SECOND INSTALLMENT REGIONAL MEETING--BOSTON, MA MEETING DATE AND LOCATION Friday, April 15, 2016 Doors open: 8:30 AM; Program begins: 9:30 AM Marriott Long Wharf (Salons D, E, F, L) 296 State Street Boston, MA 02109 Watch the April 15th Boston regional meeting here. MEETING INFORMATION The U.S. Department of Energy Secretary Ernest Moniz and Dr. John P. Holdren, Director of the White House Office of Science will host a public stakeholder meeting on the second installment of the

  12. QER SECOND INSTALLMENT REGIONAL MEETING--DES MOINES, IOWA | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy DES MOINES, IOWA QER SECOND INSTALLMENT REGIONAL MEETING--DES MOINES, IOWA MEETING DATE AND LOCATION Friday, May 6, 2016 Doors open: 8:00 AM, Program begins: 8:30 AM State Historical Building 600 East Locust Street Des Moines, IA 50319 Watch the May 6th Des Moines regional meeting here. MEETING INFORMATION The Quadrennial Energy Review Task Force will host a public stakeholder meeting on the second installment of the Quadrennial Energy Review (QER), an integrated study of the U.S.

  13. QER SECOND INSTALLMENT REGIONAL MEETING--SALT LAKE CITY, UT | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy SALT LAKE CITY, UT QER SECOND INSTALLMENT REGIONAL MEETING--SALT LAKE CITY, UT MEETING DATE AND LOCATION Monday, April 25, 2016 Doors open: 8:00 AM; Program begins: 8:30 AM Western Electricity Coordinating Council 155 North 400 West, Suite 200 Salt Lake City, UT 84103 Watch the April 25th Salt Lake City regional meeting here. MEETING INFORMATION The Quadrennial Energy Review Task Force will host a public stakeholder meeting on the second installment of the Quadrennial Energy Review

  14. QER Second Installment Public Meeting-Washington, DC | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Initiatives » The Quadrennial Energy Review (QER) » Quadrennial Energy Review Stakeholder Engagement » QER Second Installment Public Meeting-Washington, DC QER Second Installment Public Meeting-Washington, DC MEETING DATE AND LOCATION Thursday, February 4, 2016 Doors open: 8:30 AM; Program begins: 9:30 AM U.S. Capitol Visitor Center 1st and East Capitol Streets NE Washington, DC 20510 Watch the February 4th Stakeholder Meeting here. MEETING INFORMATION The U.S. Department of Energy Secretary

  15. Largest On-Campus Solar Facility Being Installed at William Paterson |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Largest On-Campus Solar Facility Being Installed at William Paterson Largest On-Campus Solar Facility Being Installed at William Paterson March 29, 2010 - 10:57am Addthis Paul Lester Paul Lester Digital Content Specialist, Office of Public Affairs What does this project do? Solar arrays at parking lots and photovoltaic cells on the rooftops of campus buildings should provide about 15 to 20 percent of our energy needs on the campus. Cranes place solar panels on roofs and

  16. Guidance. Requirements for Installing Renewable Fuel Pumps at Federal Fleet Fueling Centers under EISA Section 246

    SciTech Connect (OSTI)

    none,

    2011-04-01

    On December 19, 2007, the Energy Independence and Security Act of 2007 (EISA) was signed into law as Public Law 110-140. Section 246(a) of EISA directs Federal agencies to install at least one renewable fuel pump at each Federal fleet fueling center under their jurisdiction by January 1, 2010. Section 246(b) requires the President to submit an annual report to Congress on Federal agency progress in meeting this renewable fuel pump installation mandate. This guidance document provides guidelines to help agencies understand these requirements and how to comply with EISA Section 246.

  17. Report on Preliminary Engineering Study for Installation of an Air Cooled Steam Condenser at Brawley Geothermal Plant, Unit No. 1

    SciTech Connect (OSTI)

    1982-03-01

    The Brawley Geothermal Project comprises a single 10 MW nominal geothermal steam turbine-generator unit which has been constructed and operated by the Southern California Edison Company (SCE). Geothermal steam for the unit is supplied through contract by Union Oil Company which requires the return of all condensate. Irrigation District (IID) purchases the electric power generated and provides irrigation water for cooling tower make-up to the plant for the first-five years of operation, commencing mid-1980. Because of the unavailability of irrigation water from IID in the future, SCE is investigating the application and installation of air cooled heat exchangers in conjunction with the existing wet (evaporative) cooling tower with make-up based on use of 180 gpm (nominal) of the geothermal condensate which may be made available by the steam supplier.

  18. Measure Guideline. Installing Rigid Foam Insulation on the Interior of Existing Brick Walls

    SciTech Connect (OSTI)

    Natarajan, Hariharan; Klocke, Steve; Puttagunta, Srikanth

    2012-06-01

    This measure guideline provides information on an effective method to insulate the interior of existing brick masonry walls with extruded polystyrene (XPS) insulation board. The guide outlines step-by-step design and installation procedures while explaining the benefits and tradeoffs where applicable. The authors intend that this document be useful to a varied audience that includes builders,remodelers, contractors and homeowners.

  19. Opportunities for improving regulations governing the seismic safety of large nuclear installations

    Office of Energy Efficiency and Renewable Energy (EERE)

    Opportunities for Improving Regulations Governing the Seismic Safety of Large Nuclear Installations Robert J. Budnitz, Ph.D. LBNL University of California, Berkeley, CA 94720 Andrew S. Whittaker, Ph.D., S.E. MCEER University at Buffalo, Buffalo, NY 14260

  20. Financing Solar Installations with New Markets Tax Credits: Denver, Colorado (Fact Sheet)

    SciTech Connect (OSTI)

    Coughlin, J.

    2010-09-01

    Fact sheet provides a brief overview of New Markets Tax Credits (NMTCs), a third-party financing incentive for solar installations in the public sector. NMTCs are intended to encourage economic activity in low-income and disadvantaged neighborhoods. The use of NMTCs in an innovative solar project transaction by the City of Denver, Colorado, is highlighted.

  1. 1.5 MW turbine installation at NREL's NWTC on Aug. 21

    ScienceCinema (OSTI)

    None

    2013-05-29

    Generating 20 percent of the nation's electricity from clean wind resources will require more and bigger wind turbines. NREL is installing two large wind turbines at the National Wind Technology Center to examine some of the industry's largest machines and address issues to expand wind energy on a commercial scale.

  2. Solar heating and cooling of residential buildings: sizing, installation and operation of systems. 1980 edition

    SciTech Connect (OSTI)

    1980-09-01

    This manual was prepared as a text for a training course on solar heating and cooling of residential buildings. The course and text are directed toward sizing, installation, operation, and maintenance of solar systems for space heating and hot water supply, and solar cooling is treated only briefly. (MHR)

  3. DOE ORDER 5480.14, PHASE I - INSTALLATION ASSESSMENT FOR THE BETTIS ATOMIC POWER LABORATORY

    Office of Legacy Management (LM)

    DOE ORDER 5480.14, PHASE I - INSTALLATION ASSESSMENT FOR THE BETTIS ATOMIC POWER LABORATORY Prepared for the U.S. Department of Energy by Westinghouse Electric Corporation West Mifflin, Pennsylvania 15122-0079 i' Vendor Contract Number: DE-ACll-76PN00014 : IAELE OF CONTENTS I. Executive Summary ............................................. 2. Introduction .................................................. a. Background......;.........................................i b. Authority

  4. Solar Schools Assessment and Implementation Project: Financing Options for Solar Installations on K-12 Schools

    SciTech Connect (OSTI)

    Coughlin, J.; Kandt, A.

    2011-10-01

    This report focuses on financial options developed specifically for renewable energy and energy efficiency projects in three California public school districts. Solar energy systems installed on public schools have a number of benefits that include utility bill savings, reductions in greenhouse gas emissions (GHGs) and other toxic air contaminants, job creation, demonstrating environmental leadership, and creating learning opportunities for students. In the 2011 economic environment, the ability to generate general-fund savings as a result of reducing utility bills has become a primary motivator for school districts trying to cut costs. To achieve meaningful savings, the size of the photovoltaic (PV) systems installed (both individually on any one school and collectively across a district) becomes much more important; larger systems are required to have a material impact on savings. Larger PV systems require a significant financial commitment and financing therefore becomes a critical element in the transaction. In simple terms, school districts can use two primary types of ownership models to obtain solar installations and cost savings across a school district. The PV installations can be financed and owned directly by the districts themselves. Alternatively, there are financing structures whereby another entity, such as a solar developer or its investors, actually own and operate the PV systems on behalf of the school district. This is commonly referred to as the 'third-party ownership model.' Both methods have advantages and disadvantages that should be weighed carefully.

  5. Reviewing Post-Installation and Annual Reports for Federal ESPC Projects

    Office of Energy Efficiency and Renewable Energy (EERE)

    The purpose of this document is to provide a framework for implementing uniform and consistent reviews of post-installation and annual reports for federal ESPC projects. These procedures will allow for consistent evaluations of performance reports, produce standardized reviews, and enable centralized tracking of ongoing project performance.

  6. Installation of the Light-Water Breeder Reactor at the Shippingport Atomic Power Station (LWBR Development Program)

    SciTech Connect (OSTI)

    Massimino, R.J.; Williams, D.A.

    1983-05-01

    This report summarizes the refueling operations performed to install a Light Water Breeder Reactor (LWBR) core into the existing pressurized water reactor vessel at the Shippingport Atomic Power Station. Detailed descriptions of the major installation operations (e.g., primary system preconditioning, fuel installation, pressure boundary seal welding) are included as appendices to this report; these operations are of technical interest to any reactor servicing operation, whether the reactor is a breeder or a conventional light water non-breeder core.

  7. Case study installation of a HDPE curtain wall with sheetpile tie-in on both ends

    SciTech Connect (OSTI)

    Schindler, R.M.; Maltese, P.C.

    1997-12-31

    The plans for eliminating the off-site migration of non-aqueous phase liquid (NAPL) from a refinery into a nearby river included the installation of a High Density Polyethylene (HDPE) curtain wall and an underdrain system. A 640 m (2100 lineal feet) HDPE Curtain Wall was installed along the river boundary, tying into an existing sheet pile wall on both ends. The wall varied from approximately 4.5 m (15 feet) deep at the northern end to about 7 m (23 feet) deep at the southern end, running approximately 3 to 3.6 m (10 to 12 feet) inland of an existing wooden bulkhead. The curtain wall was successfully installed through a slurry supported trench. A 930 m (3050 lineal feet) interception/collection trench was installed parallel to the HDPE Curtain Wall, continuing on beyond the curtain wall on the southern end. The depth of the trench varied from approximately 3 to 4 m (10 to 13 feet) deep. A 20.32 cm (8 inch) diameter perforated HDPE header pipe was placed in the trench to convey groundwater and product to two sumps. The trench is 53.34 cm (21 inches) wide and contained aggregate to approximately 0.9 m (3 feet) below ground. This work was accomplished using the bio-polymer slurry drainage trench (BP Drain) technique. This paper briefly describes the construction methods utilized during this project, specifically HDPE curtain wall installation thru a bentonite slurry and tie-in to the existing sheet pile wall.

  8. Analyses of High Pressure Molten Debris Dispersion for a Typical PWR Plant

    SciTech Connect (OSTI)

    Osamu KAawabata; Mitsuhiro Kajimoto [Japan Nuclear Energy Safety Organization (Japan)

    2006-07-01

    In such severe core damage accident, as small LOCAs with no ECCS injection or station blackout, in which the primary reactor system remains pressurized during core melt down, certain modes of vessel failure would lead to a high pressure ejection of molten core material. In case of a local failure of the lower head, the molten materials would initially be ejected into the cavity beneath the pressure vessel may subsequently be swept out from the cavity to the containment atmosphere and it might cause the early containment failure by direct contact of containment steel liner with core debris. When the contribution of a high-pressure scenario in a core damage frequency increases, early conditional containment failure probability may become large. In the present study, the verification analysis of PHOENICS code and the combining analysis with MELCOR and PHOENICS codes were performed to examine the debris dispersion behavior during high pressure melt ejection. The PHOENICS code which can treat thermal hydraulic phenomena, was applied to the verification analysis for melt dispersion experiments conducted by the Purdue university in the United States. A low pressure melt dispersion experiment at initial pressure 1.4 MPas used metal woods as a molten material was simulated. The analytical results with molten debris dispersion mostly from the model reactor cavity compartment showed an agreement with the experimental result, but the analysis result of a volumetric median diameter of the airborne debris droplets was estimated about 1.5 times of the experimental result. The injection rates of molten debris and steam after reactor vessel failure for a typical PWR plant were analyzed using the MELCOR code. In addition, PHOENICS was applied to a 3D analysis for debris dispersion with low primary pressure at the reactor vessel failure. The analysis result showed that almost all the molten debris were dispersed from the reactor vessel cavity compartment by about 45 seconds after the

  9. Preliminary assessment report for Wayland Army National Guard Armory (former Boston Defense Area Nike Battery 73), Installation 23295, Wayland, Massachusetts. Installation Restoration Program

    SciTech Connect (OSTI)

    Haffenden, R.; Flaim, S.; Krokosz, M.

    1993-08-01

    This report presents the results of preliminary assessment (PA) conducted by Argonne National Laboratory at the Massachusetts Army National Guard property near Wayland, Massachusetts. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in respond to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining sites activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Wayland Army National Guard Army property, Phase I of the Department of Defense Installation Restoration Program.

  10. Preliminary assessment report for Grubbs/Kyle Training Center, Smyrna/Rutherford County Regional Airport, Installation 47340, Smyrna, Tennessee. Installation Restoration Program

    SciTech Connect (OSTI)

    Dennis, C.; Stefano, J.

    1993-07-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Tennessee Army National Guard (TNARNG) property near Smyrna, Tennessee. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Grubbs/Kyle Training Center property, the requirement of the Department of Defense Installation Restoration Program.

  11. Have the best available trap on the job, check design, installation, and maintenance

    SciTech Connect (OSTI)

    Spires, F.; Toy, D.A.

    1986-12-01

    Industrial and commercial installations can have much more efficient steam systems with properly designed, installed, and maintained steam traps. Thirty years ago, steam trap maintenance did not have near the significance it does today; fuel costs have risen from about $0.30 per 1000 lb of steam to over 25 times that a few years ago to about 15 times that cost today. Worn or otherwise malfunctioning steam traps can take quite a toll on the energy bill, especially since most traps are designed to fail in the open position. Failure of just one steam trap with a 1/2'' diameter orifice in the open position can cost $45,090 a year. This article gives guidelines for the prevention of steam trap failures.

  12. Broad Overview of Energy Efficiency and Renewable Energy Opportunities for Department of Defense Installations

    SciTech Connect (OSTI)

    Anderson, E.; Antkowiak, M.; Butt, R.; Davis, J.; Dean, J.; Hillesheim, M.; Hotchkiss, E.; Hunsberger, R.; Kandt, A.; Lund, J.; Massey, K.; Robichaud, R.; Stafford, B.; Visser, C.

    2011-08-01

    The Strategic Environmental Research and Developmental Program (SERDP)/Environmental Security Technology Certification Program (ESTCP) is the Department of Defense?s (DOD) environmental science and technology program focusing on issues related to environment and energy for the military services. The SERDP/ESTCP Office requested that the National Renewable Energy Laboratory (NREL) provide technical assistance with strategic planning by evaluating the potential for several types of renewable energy technologies at DOD installations. NREL was tasked to provide technical expertise and strategic advice for the feasibility of geothermal resources, waste-to-energy technology, photovoltaics (PV), wind, microgrids, and building system technologies on military installations. This technical report is the deliverable for these tasks.

  13. Engineering tasl plan for the development, fabrication and installation of rotary mode core sample truck bellows

    SciTech Connect (OSTI)

    BOGER, R.M.

    1999-06-24

    The Rotary Mode Core Sampling Trucks (RMSCTs) currently use a multi-sectioned bellows between the grapple box and the quill rod to compensate for drill head motion and to provide a path for purge gas. The current bellows, which is detailed on drawing H-2-690059, is expensive to procure, has a lengthy procurement cycle, and is prone to failure. Therefore, a task has been identified to design, fabricate, and install a replacement bellows. This Engineering Task Plan (ETP) is the management plan document for accomplishing the identified tasks. Any changes in scope of the ETP shall require formal direction by the Characterization Engineering manager. This document shall also be considered the work planning document for developmental control per Development Control Requirements (HNF 1999a). This Engineering Task Plan (ETP) is the management plan document for accomplishing the design, fabrication, and installation of a replacement bellows assembly for the Rotary Mode Core Sampling Trucks 3 and 4 (RMCST).

  14. Engineering task plan for the vapor monitor installation into 241-C-103 tank

    SciTech Connect (OSTI)

    Hertelendy, N.A.

    1994-12-01

    A vapor flow monitor is to be installed into the 241-C-103 tank`s exhaust, just downstream of the HEPA filter. The flow monitor system includes the flow sensor, the baffle assembly, the signal conditioning and control electronics, and a chart recorder. The electronics package and the chart recorder are installed into a small, heated instrument cabinet that is mounted on the same steel pallet on which the flowmeter and the diffuser assembly is mounted. The flowmeter is connected to the HEPA filter with an unheated, un-insulated flex hose. An automatic drain, upstream of the flowmeter, is designed to automatically drain the condensate into an evaporating pan. The flowmeter is heated with a temperature controlled heater to avoid condensation.

  15. Apparatus for installing condition-sensing means in subterranean earth formations

    DOE Patents [OSTI]

    Shuck, Lowell Z.

    1981-01-01

    The present invention is directed to an apparatus for installing strain gages or other sensors-transducers in wellbores penetrating subterranean earth formations. The subject apparatus comprises an assembly which is lowered into the wellbore, secured in place, and then actuated to sequentially clean the wellbore or casing surface at a selected location with suitable solvents, etchants and neutralizers, grind the surface to a relatively smooth finish, apply an adhesive to the surface, and attach the strain gages or the like to the adhesive-bearing surface. After installing the condition-sensing gages to the casing or earth formation the assembly is withdrawn from the wellbore leaving the sensing gages securely attached to the casing or the subterranean earth formation.

  16. Measurement of spatial and temporal behavior of H{sub ?} emission from Aditya tokamak using a diagnostic based on a photomultiplier tube array

    SciTech Connect (OSTI)

    Chowdhuri, M. B. Ghosh, J.; Manchanda, R.; Banerjee, S.; Ramaiya, N.; Virani, Niral; Mali, Aniruddh; Amardas, A.; Kumar, Pintu; Tanna, R. L.; Gupta, C. N.; Bhatt, S. B.; Chattopadhyay, P. K.; Kumar, Ajay

    2014-11-15

    A photo multiplier tube (PMT) array based spectroscopic diagnostic with fast time response of 10 ?s and spatial resolution ?3 cm has been developed and installed on Aditya tokamak to study the spatial and temporal behavior of H{sub ?} emissions from typical discharges. Collimated light has been collected from the plasma along 16 lines of sight passing through entire plasma poloidal cross section of Aditya and detected by two 8 channels PMT arrays after selecting H{sub ?} emission using interference filter. The studies are carried out during plasma formation phase of Aditya by changing vertical field and its delay with respect to loop voltage. It is observed that plasma initiated in the high field side in typical discharges of Aditya. The plasma formation position is matched with null field location estimated through simulation.

  17. Federal Grant Fully Funds Small Turbine Installation at Maine Senior Housing Complex

    SciTech Connect (OSTI)

    Not Available

    2008-01-01

    In March 2007, local agencies in Maine launched an effort to reduce energy costs for residents of a subsidized elderly housing complex in Winter Harbor, resulting in a federal Residential Energy Assistance Challenge (REACH) grant that entirely funded the installation of a 10-kW Bergey Excel turbine. This fact sheet describes the project, including difficulties encountered during the permitting process and a summary of the costs covered by the REACH grant.

  18. Summary Article: IEA HPP Annex 36: Quality Installation / Quality Maintenance Sensitivity Studies

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Hourahan, Glenn; Domanski, Piotr; Baxter, Van D.

    2015-01-01

    The outcome from this Annex activity clearly identifies that poorly designed, installed, and/or maintained heat pumps operate inefficiently and waste considerable energy compared to their as-designed potential. Additionally, it is clear that small faults for a given field-observed practice are significant, that some attribute deviations (in various equipment applications and geographical locations) have a larger impact than others, and that multiple faults or deviations have a cumulative impact on heat pump performance.

  19. Reviewing Post-Installation and Annual Reports for Federal ESPC Projects

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reviewing Post-Installation and Annual Reports For Federal ESPC Projects February 2007 Federal Energy Management Program (FEMP) Office of Energy Efficiency and Renewable Energy U.S. Department of Energy This document was developed for the U.S. Department of Energy's Federal Energy Management Program by Nexant, Inc., and Lawrence Berkeley National Laboratory. This document is posted on FEMP's Web site at www.eere.energy.gov/femp/financing/superespcs_mvresources.html. Contents Reviewing

  20. 2010.06.01 S-1 memo, Installation of Cool Roofs on DOE Buildings.pdf

    Office of Environmental Management (EM)

    Department of Energy Assessment of Demand Response and Advanced Metering - Staff Report 2010 Assessment of Demand Response and Advanced Metering - Staff Report 2010 Assessment of Demand Response and Advanced Metering - Staff Report. The Federal Energy Regulatory Commission's 2010 Demand Response and Advanced Metering Survey (2010 FERC Survey, covering calendar year 2009) indicates that advanced metering penetration (i.e., the fraction of all installed meters that are advanced meters) reached

  1. Floodplain Assessment for Installation of a Renewable Energy Anaerobic Digester Facility

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Installation of a Renewable Energy Anaerobic Digester Facility at the University of California, Davis in Yolo County, California January 11, 2013 1.0 Introduction This floodplain assessment has been prepared in accordance with 10 Code of Federal Regulations (CFR) 1022, "Compliance with Floodplain and Wetland Environmental Review Requirements" which were promulgated to implement the requirements of the U.S. Department of Energy's (DOE's) responsibilities under Executive Order 11988,

  2. Broad Overview of Energy Efficiency and Renewable Energy Opportunities for Department of Defense Installations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Broad Overview of Energy Efficiency and Renewable Energy Opportunities for Department of Defense Installations E. Anderson, M. Antkowiak, R. Butt, J. Davis, J. Dean, M. Hillesheim, E. Hotchkiss, R. Hunsberger, A. Kandt, J. Lund, K. Massey, R. Robichaud, B. Stafford, and C. Visser Produced under direction of the Strategic Environmental Research and Developmental Program for the U.S. Department of Defense by the National Renewable Energy Laboratory (NREL) under Interagency Agreement IAG-10-1779

  3. Hole in one: Technicians smoothly install the center stack in the NSTX-U

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    vacuum vessel | Princeton Plasma Physics Lab Hole in one: Technicians smoothly install the center stack in the NSTX-U vacuum vessel By John Greenwald November 10, 2014 Tweet Widget Google Plus One Share on Facebook Closeup of the center stack being lowered into position by an overhead crane. (Photo by Elle Starkman/PPPL Office of Communications) Closeup of the center stack being lowered into position by an overhead crane. Gallery: Technicians guide the unit into place. (Photo by Elle

  4. Safety basis for the 241-AN-107 mixer pump installation and caustic addition

    SciTech Connect (OSTI)

    Van Vleet, R.J.

    1994-10-05

    This safety Basis was prepared to determine whether or not the proposed activities of installing a 76 HP jet mixer pump and the addition of approximately 50,000 gallons of 19 M (50:50 wt %) aqueous caustic are within the safety envelope as described by Tank Farms (chapter six of WHC-SD-WM-ISB-001, Rev. 0). The safety basis covers the components, structures and systems for the caustic addition and mixer pump installation. These include: installation of the mixer pump and monitoring equipment; operation of the mixer pump, process monitoring equipment and caustic addition; the pump stand, caustic addition skid, the electrical skid, the video camera system and the two densitometers. Also covered is the removal and decontamination of the mixer pump and process monitoring system. Authority for this safety basis is WHC-IP-0842 (Waste Tank Administration). Section 15.9, Rev. 2 (Unreviewed Safety Questions) of WHC-IP-0842 requires that an evaluation be performed for all physical modifications.

  5. Development of an Improved Process for Installation Projects of High Technology Manufacturing Equipment

    SciTech Connect (OSTI)

    Quintana, Sarah V.

    2014-04-30

    High technology manufacturing equipment is utilized at Los Alamos National Laboratory (LANL) to support nuclear missions. This is undertaken from concept initiation where equipment is designed and then taken through several review phases, working closely with system engineers (SEs) responsible for each of the affected systems or involved disciplines (from gasses to HVAC to structural, etc.). After the design is finalized it moves to procurement and custom fabrication of the equipment and equipment installation, including all of the paperwork involved. Not only are the engineering and manufacturing aspects important, but also the scheduling, financial forecasting, and planning portions that take place initially and are sometimes modified as the project progresses should requirements, changes or additions become necessary. The process required to complete a project of this type, including equipment installation, is unique and involves numerous steps to complete. These processes can be improved and recent work on the Direct Current Arc (DC Arc) Glovebox Design, Fabrication and Installation Project provides an opportunity to identify some important lessons learned (LL) that can be implemented in the future for continued project improvement and success.

  6. Solar PV Manufacturing Cost Model Group: Installed Solar PV System Prices (Presentation)

    SciTech Connect (OSTI)

    Goodrich, A. C.; Woodhouse, M.; James, T.

    2011-02-01

    EERE's Solar Energy Technologies Program is charged with leading the Secretary's SunShot Initiative to reduce the cost of electricity from solar by 75% to be cost competitive with conventional energy sources without subsidy by the end of the decade. As part of this Initiative, the program has funded the National Renewable Energy Laboratory (NREL) to develop module manufacturing and solar PV system installation cost models to ensure that the program's cost reduction targets are carefully aligned with current and near term industry costs. The NREL cost analysis team has leveraged the laboratories' extensive experience in the areas of project finance and deployment, as well as industry partnerships, to develop cost models that mirror the project cost analysis tools used by project managers at leading U.S. installers. The cost models are constructed through a "bottoms-up" assessment of each major cost element, beginning with the system's bill of materials, labor requirements (type and hours) by component, site-specific charges, and soft costs. In addition to the relevant engineering, procurement, and construction costs, the models also consider all relevant costs to an installer, including labor burdens and overhead rates, supply chain costs, and overhead and materials inventory costs, and assume market-specific profits.

  7. Guidelineless system for riser entry/reentry that permits quick release of a riser column from a subsea installation

    SciTech Connect (OSTI)

    McConaughy, R.C.; Wright, J.W.

    1983-08-23

    A guidelineless riser entry/reentry system is disclosed which permits a safe and quick release of riser column from a subsea installation. The system includes two guide funnels mounted on opposite sides of the subsea installation at the upper end thereof for the purpose of engaging respective telescopic posts mounted at the lower end of the riser column. With the posts in an extended position the riser may be appropriately maneuvered to position the posts in their respective guide funnels. This way, the riser is properly positioned on and orientated with respect to the subsea installation. The riser may then be disconnected or connected to the subsea installation and the posts moved into retracted position so that the riser may be rapidly removed from the subsea installation.

  8. FEASIBILITY ANALYSIS FOR INSTALLING A CIRCULATING FLUIDIZED BED BOILER FOR COFIRING MULTIPLE BIOFUELS AND OTHER WASTES WITH COAL AT PENN STATE UNIVERSITY

    SciTech Connect (OSTI)

    Bruce G. Miller; Sharon Falcone Miller; Robert Cooper; Douglas Donovan; John Gaudlip; Matthew Lapinsky; William Serencsits; Neil Raskin; Dale Lamke; Joseph J. Battista

    2001-03-31

    The Pennsylvania State University, under contract to the U.S. Department of Energy (DOE), National Energy Technology Laboratory (NETL) is performing a feasibility analysis on installing a state-of-the-art circulating fluidized bed (CFB) boiler and ceramic filter emission control device at Penn State's University Park campus for cofiring multiple biofuels and other wastes with coal, and developing a test program to evaluate cofiring multiple biofuels and coal-based feedstocks. Penn State currently operates an aging stoker-fired steam plant at its University Park campus and has spent considerable resources over the last ten to fifteen years investigating boiler replacements and performing life extension studies. This effort, in combination with a variety of agricultural and other wastes generated at the agricultural-based university and the surrounding rural community, has led Penn State to assemble a team of fluidized bed and cofiring experts to assess the feasibility of installing a CFB boiler for cofiring biomass and other wastes along with coal-based fuels. The objective of the project is being accomplished using a team that includes personnel from Penn State's Energy Institute and the Office of Physical Plant, Foster Wheeler Energy Services, Inc., and Cofiring Alternatives.

  9. FEASIBILITY ANALYSIS FOR INSTALLING A CIRCULATING FLUIDIZED BED BOILER FOR COFIRING MULTIPLE BIOFUELS AND OTHER WASTES WITH COAL AT PENN STATE UNIVERSITY

    SciTech Connect (OSTI)

    Bruce G. Miller; Sharon Falcone Miller; Robert Cooper; Douglas Donovan; John Gaudlip; Matthew Lapinsky; William Serencsits; Neil Raskin; Dale Lamke

    2001-10-12

    The Pennsylvania State University, under contract to the U.S. Department of Energy (DOE), National Energy Technology Laboratory (NETL) is performing a feasibility analysis on installing a state-of-the-art circulating fluidized bed (CFB) boiler and ceramic filter emission control device at Penn State's University Park campus for cofiring multiple biofuels and other wastes with coal, and developing a test program to evaluate cofiring multiple biofuels and coal-based feedstocks. Penn State currently operates an aging stoker-fired steam plant at its University Park campus and has spent considerable resources over the last ten to fifteen years investigating boiler replacements and performing life extension studies. This effort, in combination with a variety of agricultural and other wastes generated at the agricultural-based university and the surrounding rural community, has led Penn State to assemble a team of fluidized bed and cofiring experts to assess the feasibility of installing a CFB boiler for cofiring biomass and other wastes along with coal-based fuels.

  10. FEASIBILITY ANALYSIS FOR INSTALLING A CIRCULATING FLUIDIZED BED BOILER FOR COFIRING MULTIPLE BIOFUELS AND OTHER WASTES WITH COAL AT PENN STATE UNIVERSITY

    SciTech Connect (OSTI)

    Bruce G. Miller; Sharon Falcone Miller; Robert Cooper; Douglas Donovan; John Gaudlip; Matthew Lapinsky; William Serencsits; Neil Raskin; Tom Steitz

    2002-07-12

    The Pennsylvania State University, under contract to the U.S. Department of Energy (DOE), National Energy Technology Laboratory (NETL) is performing a feasibility analysis on installing a state-of-the-art circulating fluidized bed (CFB) boiler and ceramic filter emission control device at Penn State's University Park campus for cofiring multiple biofuels and other wastes with coal, and developing a test program to evaluate cofiring multiple biofuels and coal-based feedstocks. Penn State currently operates an aging stoker-fired steam plant at its University Park campus and has spent considerable resources over the last ten to fifteen years investigating boiler replacements and performing life extension studies. This effort, in combination with a variety of agricultural and other wastes generated at the agricultural-based university and the surrounding rural community, has led Penn State to assemble a team of fluidized bed and cofiring experts to assess the feasibility of installing a CFB boiler for cofiring biomass and other wastes along with coal-based fuels. The objective of the project is being accomplished using a team that includes personnel from Penn State's Energy Institute, Office of Physical Plant, and College of Agricultural Sciences; Foster Wheeler Energy Services, Inc.; Parsons Energy and Chemicals Group, Inc.; and Cofiring Alternatives.

  11. Effect of gaps on the performance of the vertically installed wet thermal insulator

    SciTech Connect (OSTI)

    Kim, S. H.; Kim, Y. I.; Park, C. T.; Choi, S.; Yoon, J.

    2012-07-01

    In SMART, the main flow path of the reactor coolant and the pressurizer partially share common walls in the reactor coolant system. To reduce this heat transfer, the wet thermal insulator (WTI) is installed on the inner wall of the pressurizer. The WTI is constituted of stacked thin stainless steel plates. The water layer width between the plates is chosen to suppress natural convection in each layer. The plates of the WTI require clearance for thermal expansion. When the WTI is installed on a vertical wall, this clearance might cause gaps at the top and bottom at the operating condition. In this study, we focused on the effect of gaps at the both ends on the WTI performance. A numerical simulation was conducted for an 8-layer WTI with gaps at the both ends. To compare with this, a simulation of a WTI without a gap, which is an ideal case, was also conducted. The simulation was conducted in a 2-dimensional manner by a commercial computational fluid dynamics code, FLUENT. The simulations showed that the WTI thermal performance was substantially decreased by a flow that circulated through the top and bottom gaps and water layers at the sides of the WTI. This circulation caused a high temperature difference between the wall and the circulating flow. To find a way to prevent this performance deterioration of the WTI we simulated several cases with the smaller gap heights. However, the flow circulation and the higher heat transfer rate were still observed even at a case with the smallest gap, which seems to be hardly achievable in a real installation. Another way of reducing the flow circulation was suggested and also simulated in this study. (authors)

  12. Safety assessment of discharge chute isolation barrier preparation and installation activities. Revision 3

    SciTech Connect (OSTI)

    Meichle, R.H.

    1994-11-08

    This revision adds a section addressing impacts of dropping surfacing tool and rack cutter on the basin floor, and corrects typographical errors. The safety assessment is made for the activities for the preparation and installation of the discharge chute isolation barriers. The safety assessment includes a hazard assessment and comparisons of potential accidents/events to those addressed by the current safety basis documentation. No significant hazards were identified. An evaluation against the USQ evaluation questions was made and the determination made that the activities do not represent a USQ. Hazard categorization techniques were used to provide a basis for readiness review classifications.

  13. Safety assessment of discharge chute isolation barrier preparation and installation. Revision 1

    SciTech Connect (OSTI)

    Meichle, R.H.

    1994-10-10

    This revision responds to RL comments and increases the discussion of the ``effective hazard categorization`` and the readiness review basis. The safety assessment is made for the activities for the preparation and installation of the discharge chute isolation barriers. The safety assessment includes a hazard assessment and comparison of potential accidents/events to those addressed by the current safety basis documentation. No significant hazards were identified. An evaluation against the USQ evaluation questions were made and the determination made that the activities do not represent a USQ. Hazard categorization techniques were used to provide a basis for readiness review classification.

  14. Series 50 propane-fueled Nova bus: Engine development, installation, and field trials

    SciTech Connect (OSTI)

    Smith, B.

    1999-01-01

    The report describes a project to develop the Detroit Diesel series 50 liquefied propane gas (LPG) heavy-duty engine and to conduct demonstrations of LPG-fuelled buses at selected sites (Halifax Regional Municipality and three sites in the United States). The project included five main elements: Engine development and certification, chassis re-engineering and engine installation, field demonstration, LPG fuel testing, and LPG fuel variability testing. Lessons learned with regard to engine design and other issues are discussed, and recommendations are made for further development and testing.

  15. Handbook of experiences in the design and installation of solar heating and cooling systems

    SciTech Connect (OSTI)

    Ward, D.S.; Oberoi, H.S.

    1980-07-01

    A large array of problems encountered are detailed, including design errors, installation mistakes, cases of inadequate durability of materials and unacceptable reliability of components, and wide variations in the performance and operation of different solar systems. Durability, reliability, and design problems are reviewed for solar collector subsystems, heat transfer fluids, thermal storage, passive solar components, piping/ducting, and reliability/operational problems. The following performance topics are covered: criteria for design and performance analysis, domestic hot water systems, passive space heating systems, active space heating systems, space cooling systems, analysis of systems performance, and performance evaluations. (MHR)

  16. UV-Vis Spectroscopy as a Tool for Safeguards; Instrumentation installation and fundamental data collection

    SciTech Connect (OSTI)

    Smith, Nicholas A.; Krebs, John F.; Hebden, Andrew S.

    2015-09-20

    Two spectrophotometric process monitors, one optimized for high concentration (approximately 10 g/L) and one for trace levels (approximately 10 ppm),were developed at Argonne and installed at the SRS H-Canyon facility for field testing. These systems were built of Commercial-Off-The-Shelf components utilizing a custom, facility-specific hardware interface. The systems directly provide a qualitative measurement of process chemistry (i.e. valence state). With appropriate calibrations the systems could provide quantitative data. Laboratory tests were performed to determine the spectrophotometric molar absorptivity coefficients for relevant actinide and transition metals of interest.

  17. Tests of Four PT-415 Coolers Installed in the Drop-in Mode

    SciTech Connect (OSTI)

    Green, Michael A.; Wang, S.T.

    2008-07-08

    The superconducting magnets and absorbers for MICE will be cooled using PT415 pulse tube coolers. The cooler 2nd stage will be connected to magnets and the absorbers through a helium or hydrogen re-condensing system. It was proposed that the coolers be connected to the magnets in such a way that the cooler can be easily installed and removed, which permits the magnets to be shipped without the coolers. The drop-in mode requires that the cooler 1st stage be well connected to the magnet shields and leads through a low temperature drop demountable connection. The results of the PT415 drop-in cooler tests are presented.

  18. A new Silicon Detector called Tiara is being installed in one of the cyclotrons

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Silicon Detector called Tiara is being installed in one of the cyclotrons at Texas A&M. Tiara will be used to study nuclear pairing. The specific reaction that will be studied is the 26Mg (18O, 16O) 28Mg reaction. That is a Magnesium-26 beam impingent on an Oxygen-18 target resulting in a recoiling Oxygen-16 and Magnesium-28. The purpose of this is to find information about nuclear pairing. Nucleons have similar properties to electrons in that they obey the Pauli exclusion principle. This

  19. Installation of 2 7/8-in. coiled-tubing tailpipes in live gas wells

    SciTech Connect (OSTI)

    Campbell, J.A.; Bayes, K.P.

    1994-05-01

    This paper describes a technique for installing 2 7/8-in. coiled tubing as tailpipe extensions below existing production packers in live gas wells. It also covers the use of coiled tubing as a way to complete wells. Large savings in rig time and deferred production have been realized with this technique. Fluid losses to the formation do not occur, and no expensive rig time is needed to kill or clean up the wells, as required for conventional workovers below existing production packers. This technique is particularly applicable in depleted reservoirs that could be impaired by traditional workover methods.

  20. Active control of low frequency sound in a gas turbine compressor installation

    SciTech Connect (OSTI)

    Swinbanks, M.A.

    1982-01-01

    During the last decade, the development of active attenuators has progressed from theoretical analysis, through laboratory experiments of increasing sophistication to the stage where their practical application to certain large scale industrial sources has finally become reality. This paper outlines some features which the author has investigated in the laboratory, and concludes with a description of the results achieved in applying these techniques to an 11 M.W. Avon Gas Turbine Compressor Installation. The active control hardware necessary to achieve these results represented a very considerable cost saving compared to the estimated cost of achieving similar performance by passive means.

  1. Installation, Operation, and Maintenance Strategies to Reduce the Cost of Offshore Wind Energy

    SciTech Connect (OSTI)

    Maples, B.; Saur, G.; Hand, M.; van de Pietermen, R.; Obdam, T.

    2013-07-01

    Currently, installation, operation, and maintenance (IO&M) costs contribute approximately 30% to the LCOE of offshore wind plants. To reduce LCOE while ensuring safety, this paper identifies principal cost drivers associated with IO&M and quantifies their impacts on LCOE. The paper identifies technology improvement opportunities and provides a basis for evaluating innovative engineering and scientific concepts developed subsequently to the study. Through the completion of a case study, an optimum IO&M strategy for a hypothetical offshore wind project is identified.

  2. Post-accident examination of platinum resistance thermometers installed in the TMI-2 reactor

    SciTech Connect (OSTI)

    Carroll, R.M.; Shepard, R.L.

    1985-09-01

    Laboratory tests conducted on one resistance thermometer and thermowell removed from TMI-2 showed that neither its calibration nor its time response was adversely affected by the accident or post-accident conditions to which it had been exposed. No Never-Seez was used in its thermowell. A broken conduit fitting allowed moisture to enter the extension cables, which affected their insulation resistance. Tests on similar thermometers installed in TMI-2 and Crystal River Unit 3 at shutdown and at full power showed that the time response of the TMI-2 thermometer met the 5-second limit required by the plant technical specifications.

  3. Thin-film flat-plate solar collectors for low-cost manufacture and installation

    SciTech Connect (OSTI)

    Andrews, J.W.; Wilhelm, W.G.

    1980-03-01

    A flat-plate solar energy collector design using thin-film plastics in both the absorber and glazing is described. The design approach proceeded in two steps. First, cost constraints on solar collectors were determined using reasonable economic projections. Second, engineering was applied only to those ideas which had hope of falling within those cost boundaries. The use of thin-film plastics appeared most attractive according to these criteria. The nature of the marketing and distribution network can be expected to have a strong impact on the final installed cost of the collector; the proposed design has characteristics which could make possible a reduced price markup.

  4. Installing Windows with Foam Sheathing on a Wood-Frame Wall: January 1, 2004 to December 31, 2004

    SciTech Connect (OSTI)

    2005-05-01

    In most wall assemblies, connection details around windows have been the source of problems with water penetration into the building. This report describes how to install a window into a wall with insulating sheathing as an integrated drainage plane.

  5. Composite polymeric film and method for its use in installing a very-thin polymeric film in a device

    DOE Patents [OSTI]

    Duchane, D.V.; Barthell, B.L.

    1982-04-26

    A composite polymeric film and a method for its use in forming and installing a very thin (< 10 ..mu..m) polymeric film are disclosed. The composite film consists of a thin film layer and a backing layer. The backing layer is soluble in a solvent in which the thin film layer is not soluble. In accordance with the method, the composite film is installed in a device in the same position in which it is sought to finally emplace the thin film. The backing layer is then selectiely dissolved in the solvent to leave the insoluble thin film layer as an unbacked film. The method permits a very thin film to e successfully installed in devices where the fragility of the film would preclude handling and installation by conventional methods.

  6. Composite polymeric film and method for its use in installing a very thin polymeric film in a device

    DOE Patents [OSTI]

    Duchane, David V.; Barthell, Barry L.

    1984-01-01

    A composite polymeric film and a method for its use in forming and installing a very thin (<10 .mu.m) polymeric film are disclosed. The composite film consists of a thin film layer and a backing layer. The backing layer is soluble in a solvent in which the thin film layer is not soluble. In accordance with the method, the composite film is installed in a device in the same position in which it is sought to finally emplace the thin film. The backing layer is then selectively dissolved in the solvent to leave the insoluble thin film layer as an unbacked film. The method permits a very thin film to be successfully installed in devices where the fragility of the film would preclude handling and installation by conventional methods.

  7. Technology Solutions Case Study: A Homeowner’s Guide to Window Air Conditioner Installation for Efficiency and Comfort

    SciTech Connect (OSTI)

    C. Booten

    2013-06-01

    This fact sheet offers a step-by-step guide to proper installation of window air conditioning units, in order to improve energy efficiency, cost savings, and comfort for homeowners.

  8. Maine Yankee: Making the Transition from an Operating Plant to an Independent Spent Fuel Storage Installation (ISFSI)

    SciTech Connect (OSTI)

    Norton, W.; McGough, M. S.

    2002-02-26

    The purpose of this paper is to describe the challenges faced by Maine Yankee Atomic Power Company in making the transition from an operating nuclear power plant to an Independent Spent Fuel Storage Installation (ISFSI). Maine Yankee (MY) is a 900-megawatt Combustion Engineering pressurized water reactor whose architect engineer was Stone & Webster. Maine Yankee was put into commercial operation on December 28, 1972. It is located on an 820-acre site, on the shores of the Back River in Wiscasset, Maine about 40 miles northeast of Portland, Maine. During its operating life, it generated about 1.2 billion kilowatts of power, providing 25% of Maine's electric power needs and serving additional customers in New England. Maine Yankee's lifetime capacity factor was about 67% and it employed more than 450 people. The decision was made to shutdown Maine Yankee in August of 1997, based on economic reasons. Once this decision was made planning began on how to accomplish safe and cost effective decommissioning of the plant by 2004 while being responsive to the community and employees.

  9. Test plan : reducing soft costs of rooftop solar installations attributed to structural considerations.

    SciTech Connect (OSTI)

    Dwyer, Stephen F.

    2013-05-01

    This test plan is a document that provides a systematic approach to the planned testing of rooftop structures to determine their actual load carrying capacity. This document identifies typical tests to be performed, the responsible parties for testing, the general feature of the tests, the testing approach, test deliverables, testing schedule, monitoring requirements, and environmental and safety compliance.

  10. Solar Trackers at Nellis Air Force Base

    Broader source: Energy.gov [DOE]

    This photograph features one of many SunPower T20 Tracker that are part of the 14.2-megawatt photovoltaic (PV) systems installed at Nellis Air Force Base in Nevada, which was the largest PV system...

  11. INSTALLATION OF BUBBLERS IN THE SAVANNAH RIVER SITED DEFENSE WASTE PROCESSING FACILITY MELTER

    SciTech Connect (OSTI)

    Smith, M.; Iverson, D.

    2010-12-08

    Savannah River Remediation (SRR) LLC assumed the liquid waste contract at the Savannah River Site (SRS) in the summer of 2009. The main contractual agreement was to close 22 High Level Waste (HLW) tanks in eight years. To achieve this aggressive commitment, faster waste processing throughout the SRS liquid waste facilities will be required. Part of the approach to achieve faster waste processing is to increase the canister production rate of the Defense Waste Processing Facility (DWPF) from approximately 200 canisters filled with radioactive waste glass per year to 400 canisters per year. To reach this rate for melter throughput, four bubblers were installed in the DWPF Melter in the late summer of 2010. This effort required collaboration between SRR, SRR critical subcontractor EnergySolutions, and Savannah River Nuclear Solutions, including the Savannah River National Laboratory (SRNL). The tasks included design and fabrication of the bubblers and related equipment, testing of the bubblers for various technical issues, the actual installation of the bubblers and related equipment, and the initial successful operation of the bubblers in the DWPF Melter.

  12. Designing and constructing/installing technical security countermeasures (TSCM) into supersensitive facilities

    SciTech Connect (OSTI)

    Davis, D.L.

    1988-01-01

    The design and construction of supersensitive facilities and the installation of systems secure from technical surveillance and sabotage penetration involve ''TSCM'' in the broad sense of technical ''security'' countermeasures. When the technical threat was at a lower level of intensity and sophistication, it was common practice to defer TSCM to the future facility occupant. However, the New Moscow Embassy experience has proven this course of action subject to peril. Although primary concern with the embassy was audio surveillance, elsewhere there are other threats of equal or greater concern, e.g., technical implants may be used to monitor readiness status or interfere with the operation of C3I and weapons systems. Present and future technical penetration threats stretch the imagination. The Soviets have committed substantial hard scientific resources to a broad range of technical intelligence, even including applications or parapsychology. Countering these threats involves continuous TSCM precautions from initial planning to completion. Designs and construction/installation techniques must facilitate technical inspections and preclude the broadest range of known and suspected technical penetration efforts.

  13. Installation of a reactive site for covalent wiring onto an intrinsically conductive poly(ionic liquid)

    SciTech Connect (OSTI)

    Brombosz, Scott M.; Lee, Sungwon; Firestone, Millicent A.

    2014-11-04

    We describe post-polymerization radical bromination of a nanostructured poly(ionic liquid) that selectively introduces a reactive bromo-group onto the polyalkylthiophene backbone. Raman and FT-IR spectroscopy proves that the bromine is successfully introduced at the 3-methyl position of the thiophene and that the molecular structure of the polymer remains largely intact with only minimal chain scission detected. FT-IR and Vis-NIR spectroscopy indicates that incorporation of the bromine induces twisting (loss of co-planarity) of the polythiophene backbone. WAXS confirms retention of an ordered lamellar structure with minor lattice spacing contraction. Cyclic voltammetry confirms spectroscopic findings that the bromination reaction yields a stable p-doped polymer. The installed bromine is susceptible to nucleophilic displacement permitting the covalent attachment of other functional molecules, such as a dialkylphosphonate. Elemental analysis of such a transformation established that 100 % functionalization can be achieved. These results collectively demonstrate that post-modification of a π-conjugated polymer can be used to both tune electronic and photonic properties, as well as install a chemoselective attachment point for the covalent wiring of other molecules.

  14. American National Standard: design criteria for an independent spent-fuel-storage installation (water pool type)

    SciTech Connect (OSTI)

    Not Available

    1981-01-01

    This standard provides design criteria for systems and equipment of a facility for the receipt and storage of spent fuel from light water reactors. It contains requirements for the design of major buildings and structures including the shipping cask unloading and spent fuel storage pools, cask decontamination, unloading and loading areas, and the surrounding buildings which contain radwaste treatment, heating, ventilation and air conditioning, and other auxiliary systems. It contains requirements and recommendations for spent fuel storage racks, special equipment and area layout configurations, the pool structure and its integrity, pool water cleanup, ventilation, residual heat removal, radiation monitoring, fuel handling equipment, cask handling equipment, prevention of criticality, radwaste control and monitoring systems, quality assurance requirements, materials accountability, and physical security. Such an installation may be independent of both a nuclear power station and a reprocessing facility or located adjacent to any of these facilities in order to share selected support systems. Support systems shall not include a direct means of transferring fuel assemblies from the nuclear facility to the installation.

  15. Installation of a reactive site for covalent wiring onto an intrinsically conductive poly(ionic liquid)

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Brombosz, Scott M.; Lee, Sungwon; Firestone, Millicent A.

    2014-11-04

    We describe post-polymerization radical bromination of a nanostructured poly(ionic liquid) that selectively introduces a reactive bromo-group onto the polyalkylthiophene backbone. Raman and FT-IR spectroscopy proves that the bromine is successfully introduced at the 3-methyl position of the thiophene and that the molecular structure of the polymer remains largely intact with only minimal chain scission detected. FT-IR and Vis-NIR spectroscopy indicates that incorporation of the bromine induces twisting (loss of co-planarity) of the polythiophene backbone. WAXS confirms retention of an ordered lamellar structure with minor lattice spacing contraction. Cyclic voltammetry confirms spectroscopic findings that the bromination reaction yields a stable p-dopedmore » polymer. The installed bromine is susceptible to nucleophilic displacement permitting the covalent attachment of other functional molecules, such as a dialkylphosphonate. Elemental analysis of such a transformation established that 100 % functionalization can be achieved. These results collectively demonstrate that post-modification of a π-conjugated polymer can be used to both tune electronic and photonic properties, as well as install a chemoselective attachment point for the covalent wiring of other molecules.« less

  16. Design and installation of an ultra deepwater subsea system: How to minimize risks and costs

    SciTech Connect (OSTI)

    Izetti, R.G.; Moreira, J.R.F.

    1994-12-31

    The world`s deepest Subsea Tree was successfully installed offshore Brazil at a water depth of 1,027 m. The psychological barrier of 1,000 m was finally broken. Actually, subsea completion technology reached a point where the fundamental question is no longer whether fields located at water depths beyond 1,000 m can be profitably completed. The key issue now is: is there a better and safer way to do it? PETROBRAS has pursued an aggressive strategy in research and development concept evaluations and various field studies aiming at a continuous decrease in both CAPEX and OPEX. This paper primarily describes the major subsea completion achievements, resulting from this great effort, which among other topics include: implementation of a standardization program; sharp reduction of both subsea completion and drilling time; a new flowline connection method which combines the advantages of both lay-away and pull-in methods; design and future installation of the world first subsea electrical submersible pump; completion equipment simplification and resulting cost reduction. Also addressed are the key safety aspects related to deepwater completions and the equipment design improvement necessary to safely conduct those operations.

  17. Design and installation of an ultra-deepwater subsea system: How to minimize risks and costs

    SciTech Connect (OSTI)

    Izetti, R.G.; Moreira, J.R.F.

    1995-04-01

    The world`s deepest subsea tree was successfully installed offshore Brazil at a water depth of 1,027 m, finally breaking the psychological barrier of 1,000 m. Actually, subsea completion technology has reached a point where the fundamental question no linger is whether fields located at water depths > 1,000 m can be profitably completed; is there a better and safer way to do it is now the key issue. Petrobras has pursued an aggressive strategy in R and D concept evaluations and various field studies aiming at a continuous decrease in both capital and operational expenditures. This paper describes the major subsea completion achievements resulting from this great effort, which include implementation of a standardization program; sharp reduction of subsea completion and drilling time; a new flowline connection method that combines the advantages of lay-away and pull-in methods; design and future installation of the world`s first subsea electrical submersible pump; and completion equipment simplification and resulting cost reduction. Also addressed are the key safety aspects related to deepwater completions and the equipment design improvement necessary to conduct those operations safely.

  18. Solar photovoltaic applications seminar: design, installation and operation of small, stand-alone photovoltaic power systems

    SciTech Connect (OSTI)

    Not Available

    1980-07-01

    This seminar material was developed primarily to provide solar photovoltaic (PV) applied engineering technology to the Federal community. An introduction to photoconductivity, semiconductors, and solar photovoltaic cells is included along with a demonstration of specific applications and application identification. The seminar details general systems design and incorporates most known information from industry, academia, and Government concerning small solar cell power system design engineering, presented in a practical and applied manner. Solar PV power system applications involve classical direct electrical energy conversion and electric power system analysis and synthesis. Presentations and examples involve a variety of disciplines including structural analysis, electric power and load analysis, reliability, sizing and optimization; and, installation, operation and maintenance. Four specific system designs are demonstrated: water pumping, domestic uses, navigational and aircraft aids, and telecommunications. All of the applications discussed are for small power requirement (under 2 kilowatts), stand-alone systems to be used in remote locations. Also presented are practical lessons gained from currently installed and operating systems, problems at sites and their resolution, a logical progression through each major phase of system acquisition, as well as thorough design reviews for each application.

  19. Acquired experience resulting from transforming a chemical installation into a nuclear one

    SciTech Connect (OSTI)

    Zamfirache, M.; Stefan, L.; Bornea, A.; Stefanescu, I.

    2015-03-15

    ICIT-Valcea has developed an experimental pilot-scale installation for tritium and deuterium separation. The main objective of this pilot was to demonstrate the water detritiation technology and to transfer this technology to the CANDU reactors of the Cernavoda nuclear power plant. The pilot-scale installation was initiated in 1992. The initial design and construction were performed similarly to chemical plants as the separation of isotopes was focused on only hydrogen and deuterium to assess feasibility. In a second phase we have begun to transform it into a nuclear facility with the aim of separating tritium. Moving to tritium separation has imposed a lot of changes. Changes consisted mainly of: -) re-design of the technological systems for nuclear material processing, applying specific codes and standards (ASME, Romanian nuclear specific pressure boundary prescriptions for code classification); -) design and implementation of new systems, classified as safety systems; -) re-design and implementation of command and control systems, complying with the requirements of reliability and maintenance required for the project promoted; -) revaluation of auxiliary systems (utilities, power supply); -) implementing radiation protection systems, including secondary barriers; -) implementing and maintaining environment operational program specific to the new nuclear plant; -) developing and conducting safety analyzes; and -) the production of specific documentation to obtain the necessary permits for construction, commissioning and operation of the plant.

  20. Installation of the Monitoring Site at the Los Alamos Canyon Low-Head Weir

    SciTech Connect (OSTI)

    W.J.Stone; D.L.Newell

    2002-08-01

    The Cerro Grande fire of 2000 had an enormously adverse impact on and around Los Alamos National Laboratory (LANL). Immediately there were concerns about the potential for enhanced runoff/offsite transport of contaminant-laden sediments because of watershed damage. In response to this concern, the U.S. Army Corps of Engineers installed a low-head weir in Los Alamos Canyon near the White Rock ''Y.'' However, the occurrence of fractured basalt at the surface and ponding of runoff behind the weir enhance the possibility of downward migration of contaminants. Therefore, three boreholes were drilled on the south bank of the channel by LANL to provide a means of monitoring the impact of the Cerro Grande fire and of the weir on water quality beneath the canyon. The boreholes and associated instrumentation are referred to as the Los Alamos Weir Site (LAWS). The three boreholes include a vertical hole and two angled holes (one at approximately 45{sup o} and one at approximately 30{sup o}). Since the basalt is highly fractured, the holes would not stay open. Plans called for inserting flexible liners into all holes. However, using liners in such unstable ground was problematic and, in the angled holes, required deployment through scalloped or perforated polyvinyl chloride (PVC) shield. The vertical hole (LAWS-01), drilled to a total depth of 281.5 ft below ground surface (bgs), was completed as a 278-ft deep monitoring well with four screens: one targeting shallow perched water encountered at 80 ft, two in what may correspond to the upper perched zone at regional groundwater characterization well R-9i (1/4 mi. to the west), and one in what may correspond to the lower perched zone at R-9i. A Water FLUTe{trademark} system deployed in the well isolates the screened intervals; associated transducers and sampling ports permit monitoring head and water quality in the screened intervals. The second hole (LAWS-02), drilled at an angle of 43{sup o} from horizontal, is 156 ft long and

  1. Byers Auto Group: A Case Study Into The Economics, Zoning, and Overall Process of Installing Small Wind Turbines at Two Automotive Dealerships in Ohio (Presentation)

    SciTech Connect (OSTI)

    Sinclair, K.; Oteri, F.

    2011-05-01

    This presentation provides the talking points about a case study on the installation of a $600,000 small wind project, the installation process, estimated annual energy production and percentage of energy needs met by the turbines.

  2. Byers Auto Group: A Case Study Into The Economics, Zoning, and Overall Process of Installing Small Wind Turbines at Two Automotive Dealerships in Ohio

    SciTech Connect (OSTI)

    Oteri, F.; Sinclair, K.

    2011-11-01

    This paper provides the talking points about a case study on the installation of a $600,000 small wind project, the installation process, estimated annual energy production and percentage of energy needs met by the turbines.

  3. Database (Report) of U.S. CHP Installations Incorporating Thermal Energy Storage (TES) and/or Turbine Inlet Cooling (TIC), 2004

    Office of Energy Efficiency and Renewable Energy (EERE)

    Development of a database, in Excel format, listing CHP installations incorporating thermal energy storage or turbine inlet cooling.

  4. DESIGN, SYNTHESIS, AND MECHANISTIC EVALUATION OF IRON-BASED CATALYSIS FOR SYNTHESIS GAS CONVERSION TO FUELS AND CHEMICALS

    SciTech Connect (OSTI)

    Jian Xu; Enrique Iglesia

    2004-03-31

    This project explores the extension of previously discovered Fe-based catalysts with unprecedented Fischer-Tropsch synthesis rate, selectivity, and ability to convert hydrogen-poor synthesis gas streams typical of those produced from coal and biomass sources. Contract negotiations between the U.S. Department of Energy and the University of California were completed on December 9, 2004. During this first reporting period, we have modified and certified a previously decommissioned microreactor, ordered and installed a budgeted gas chromatograph, developed and reviewed safe operating procedures and data analysis methods, and reproduced successfully previous synthetic protocols and catalytic performance of catalytic materials based on Fe-Zn-Cu-K oxide precursors synthesized using precipitation methods, drying using surface-active agents, and activated in synthesis gas within Fischer-Tropsch synthesis tubular reactors.

  5. Field Trial of an Aerosol-Based Enclosure Sealing Technology

    SciTech Connect (OSTI)

    Harrington, Curtis; Springer, David

    2015-09-01

    This report presents the results from several demonstrations of a new method for sealing building envelope air leaks using an aerosol sealing process developed by the Western Cooling Efficiency Center at UC Davis. The process involves pressurizing a building while applying an aerosol sealant to the interior. As air escapes through leaks in the building envelope, the aerosol particles are transported to the leaks where they collect and form a seal that blocks the leak. Standard blower door technology is used to facilitate the building pressurization, which allows the installer to track the sealing progress during the installation and automatically verify the final building tightness. Each aerosol envelope sealing installation was performed after drywall was installed and taped, and the process did not appear to interrupt the construction schedule or interfere with other trades working in the homes. The labor needed to physically seal bulk air leaks in typical construction will not be replaced by this technology.

  6. Method and apparatus for remote installation and servicing of underwater well apparatus

    SciTech Connect (OSTI)

    Kirkland, K.G.

    1981-08-18

    Method and apparatus are disclosed for remote installation and retrieval of underwater well apparatus and servicing of underwater wells without diver assistance by use of a remotely operated tool carried by a handling string including a composite lower joint which contains both smaller flow passages for conveying pressure fluid to the tool and larger passages for communicating with pipe in the well, the composite joint being of sufficient length to extend completely through the blowout preventers when the tool is in operative position and having a right cylindrical outer surface against which the blowout preventers can seal regardless of the rotational position of the composite joint. The invention is especially useful in connection with wells having multiple strings of tubing.

  7. Wireless power transfer electric vehicle supply equipment installation and validation tool

    SciTech Connect (OSTI)

    Jones, Perry T.; Miller, John M.

    2015-05-19

    A transmit pad inspection device includes a magnetic coupling device, which includes an inductive circuit that is configured to magnetically couple to a primary circuit of a charging device in a transmit pad through an alternating current (AC) magnetic field. The inductive circuit functions as a secondary circuit for a set of magnetically coupled coils. The magnetic coupling device further includes a rectification circuit, and includes a controllable load bank or is configured to be connected to an external controllable load back. The transmit pad inspection device is configured to determine the efficiency of power transfer under various coupling conditions. In addition, the transmit pad inspection device can be configured to measure residual magnetic field and the frequency of the input current, and to determine whether the charging device has been installed properly.

  8. Installation guidelines for Solar Heating System, single-family residence at New Castle, Pennsylvania

    SciTech Connect (OSTI)

    Not Available

    1980-01-01

    The Solar Heating System installer guidelines are provided for each subsystem and includes testing and filling the system. This single-family residential heating system is a solar-assisted, hydronic-to-warm-air system with solar-assisted domestic water heating. It is composed of the following major components: liquid cooled flat plate collectors; water storage tank; passive solar-fired domestic water preheater; electric hot water heater; heat pump with electric backup; solar hot water coil unit; tube-and-shell heat exchanger, three pumps, and associated pipes and valving in an energy transport module; control system; and air-cooled heat purge unit. Information is also provided on the operating procedures, controls, caution requirements, and routine and schedule maintenance. Information consists of written procedures, schematics, detail drawings, pictures and manufacturer's component data.

  9. Study on the financing mechanism and management for decommissioning of nuclear installations in Malaysia

    SciTech Connect (OSTI)

    Saleh, Lydia Ilaiza Ryong, Kim Tae

    2015-04-29

    The whole cycle of the decommissioning process development of repository requires the relevant bodies to have a financial system to ensure that it has sufficient funds for its whole life cycle (over periods of many decades). Therefore, the financing mechanism and management system shall respect the following status: the national position, institutional and legislative environment, technical capabilities, the waste origin, ownership, characteristics and inventories. The main objective of the studies is to focus on the cost considerations, alternative funding managements and mechanisms, technical and non-technical factors that may affect the repository life-cycle costs. As a conclusion, the outcomes of this paper is to make a good recommendation and could be applied to the national planners, regulatory body, engineers, or the managers, to form a financial management plan for the decommissioning of the Nuclear Installation.

  10. In Situ Permeable Flow Sensor installation at 100-H description of work

    SciTech Connect (OSTI)

    Vaught, D.J.

    1994-04-18

    This description of work details field activities associated with drilling four boreholes in the 100-HR-3 Operable Unit for placement of four In Situ Permeable Flow Sensors near the 183-H Basin. A sonic drill rig funded under a Cooperative Research and Development Agreement (CRADA) will be employed to drill the boreholes. This project includes installation of automatic data logging and telemetry equipment. Each Sensor will be supplied with a data logger at the surface which will be wired to a cellular phone on site or to an existing telemetry station to transmit data to a computer in 2440 Stevens Center. Power to operate the Sensors and data loggers will be supplied by a small gasoline or diesel generator. Processed data will be used to develop a three-dimensional flownet of the unconfined aquifer near and within the Columbia River influenced mixing zone.

  11. GUIDELINES FOR THE DESIGN, FABRICATION, TESTING, INSTALLATION AND OPERATION OF SRF CAVITIES

    SciTech Connect (OSTI)

    Theilacker, J.; Carter, H.; Foley, M.; Hurh, P.; Klebaner, A.; Krempetz, K.; Nicol, T.; Olis, D.; Page, T.; Peterson, T.; Pfund, P.; Pushka, D.; Schmitt, R.; Wands, R.

    2010-04-09

    Superconducting Radio-Frequency (SRF) cavities containing cryogens under pressure pose a potential rupture hazard to equipment and personnel. Generally, pressure vessels fall within the scope of the ASME Boiler and Pressure Vessel Code however, the use of niobium as a material for the SRF cavities is beyond the applicability of the Code. Fermilab developed a guideline to ensure sound engineering practices governing the design, fabrication, testing, installation and operation of SRF cavities. The objective of the guideline is to reduce hazards and to achieve an equivalent level of safety afforded by the ASME Code. The guideline addresses concerns specific to SRF cavities in the areas of materials, design and analysis, welding and brazing, pressure relieving requirements, pressure testing and quality control.

  12. Automated solar collector installation design including ability to define heterogeneous design preferences

    DOE Patents [OSTI]

    Wayne, Gary; Frumkin, Alexander; Zaydman, Michael; Lehman, Scott; Brenner, Jules

    2013-01-08

    Embodiments may include systems and methods to create and edit a representation of a worksite, to create various data objects, to classify such objects as various types of pre-defined "features" with attendant properties and layout constraints. As part of or in addition to classification, an embodiment may include systems and methods to create, associate, and edit intrinsic and extrinsic properties to these objects. A design engine may apply of design rules to the features described above to generate one or more solar collectors installation design alternatives, including generation of on-screen and/or paper representations of the physical layout or arrangement of the one or more design alternatives. Embodiments may also include definition of one or more design apertures, each of which may correspond to boundaries in which solar collector layouts should comply with distinct sets of user-defined design preferences. Distinct apertures may provide heterogeneous regions of collector layout according to the user-defined design preferences.

  13. Automated solar collector installation design including ability to define heterogeneous design preferences

    DOE Patents [OSTI]

    Wayne, Gary; Frumkin, Alexander; Zaydman, Michael; Lehman, Scott; Brenner, Jules

    2014-04-29

    Embodiments may include systems and methods to create and edit a representation of a worksite, to create various data objects, to classify such objects as various types of pre -defined "features" with attendant properties and layout constraints. As part of or in addition to classification, an embodiment may include systems and methods to create, associate, and edit intrinsic and extrinsic properties to these objects. A design engine may apply of design rules to the features described above to generate one or more solar collectors installation design alternatives, including generation of on-screen and/or paper representations of the physical layout or arrangement of the one or more design alternatives. Embodiments may also include definition of one or more design apertures, each of which may correspond to boundaries in which solar collector layouts should comply with distinct sets of user-defined design preferences. Distinct apertures may provide heterogeneous regions of collector layout according to the user-defined design preferences.

  14. Photovoltaic module kit including connector assembly for non-penetrating array installation

    DOE Patents [OSTI]

    Botkin, Jonathan; Graves, Simon; Danning, Matt; Culligan, Matthew

    2012-10-23

    A PV module kit for non-penetrating rooftop installation, including a plurality of PV modules and a plurality of connectors. Each of the PV modules includes a PV laminate and a frame forming a mounting region assembled thereto. The connectors include a male connector having a male fastener extending from a head, and a female connector having a female fastener assembled within a head. The heads are entirely formed of plastic. The kit provides a mounted array state including a junction at which the mounting region of at least two of the PV modules are aligned and interconnected by engagement of the male connector with the female connector. The so-formed junction is substantially electrically insulated. The plurality of connectors can further include a spacer connector including a head forming a bore sized to slidably receive the male fastener, with all of the connector heads being identical.

  15. Photovoltaic module kit including connector assembly for non-penetrating array installation

    DOE Patents [OSTI]

    Botkin, Jonathan; Graves, Simon; Danning, Matt; Culligan, Matthew

    2013-12-31

    A PV module kit for non-penetrating rooftop installation, including a plurality of PV modules and a plurality of connectors. Each of the PV modules includes a PV laminate and a frame forming a mounting region assembled thereto. The connectors include a male connector having a male fastener extending from a head, and a female connector having a female fastener assempbled within a head. The heads are entirely formed of plastic. The kit provides a mounted array state including a junction at which the mounting regions of at least two of the PV modules are aligned and interconnected by engagement of the male connector with the female connector. The so-formed junction is substantially electrically insulated. The plurality of connectors can further include a spacer connector including a head forming a bore sized slidably receive the male fastener, with all of the connector heads being identical.

  16. First installation of an electrical submersible pump in a subsea well

    SciTech Connect (OSTI)

    Mendonca, J.E.; Hodge, R.C.; Izetti, R.; Nicholson, A.; Dwiggins, J.L.; Morrison, D.; Cia, M.; Alfano, P.P.

    1995-12-31

    As offshore oil fields are being developed towards deeper and deeper waters, new technologies are required to curb capital expenditures. In Brazil, where oil consumption is increasing and huge oil fields lie in high water depths, the issue is particularly pressing. Earlier and higher oil production from those oil fields could be attained by the use of Electrical Submersible Pumps (ESP), so far restricted to dry completions. Also longer distances from well to platform would be made practical. For the initial phase of this development, Petrobras worked together with Tronic, Reda, Pirelli, Lasalle, Sade-Vigesa and Cooper. As a result, first-in-the-world ESP installation in a subsea well has been successfully achieved on October/1994 in RJS-221, located at Carapeba Field, Campos Basin, Brazil.

  17. Experience in the installation of a microprocessor system for controlling converter units of the Vyborg substation

    SciTech Connect (OSTI)

    Gusakovskii, K. B.; Zmaznov, E. Yu.; Katantsev, S. V.; Mazurenko, A. K.; Mestergazi, V. A.; Prochan, G. G.; Funtikova, S. F.

    2006-01-15

    The experience in the installation of modern digital systems for controlling converter units at the Vyborg converter substation on the basis of advanced microprocessor devices is considered. It is shown that debugging of a control and protection system on mathematical and physical models does not guarantee optimum control of actual converter devices. Examples of advancing the control and protection system are described, the necessity for which has become obvious in tests of actual equipment. Comparison of oscillograms of processes before optimization of the control system and after its optimization and adjustment shows that the digital control system makes it possible to improve substantially the algorithms of control and protection in the short term and without changing the hardware component.

  18. Solar heating and hot water system installed at St. Louis, Missouri. Final report

    SciTech Connect (OSTI)

    Not Available

    1980-04-01

    Information is provided on the solar heating and hot water system installed at the William Tao and Associates, Inc., office building in St. Louis, Missouri. The information consists of description, photos, maintenance and construction problems, final drawing, system requirements and manufacturer's component data. The solar system was designed to provide 50% of the hot water requirements and 45% of the space heating needs for a 900 square foot office space and drafting room. The solar facility has 252 square foot of glass tube concentrator collectors and a 1000 gallon steel storage tank buried below a concrete slab floor. Freeze protection is provided by a propylene glycol/water mixture in the collector loop. The collectors are roof mounted on a variable tilt array which is adjusted seasonally and is connected to the solar thermal storage tank by a tube-in-shell heat exchanger. Incoming city water is preheated through the solar energy thermal storage tank.

  19. Photovoltaic module kit including connector assembly for non-penetrating array installation

    DOE Patents [OSTI]

    Botkin, Jonathan; Graves, Simon; Danning, Matt; Culligan, Matthew

    2011-11-22

    A PV module kit for non-penetrating rooftop installation, including a plurality of PV modules and a plurality of connectors. Each of the PV modules includes a PV laminate and a frame forming a mounting region assembled thereto. The connectors include a male connector having a male fastener extending from a head, and a female connector having a female fastener assembled within a head. The heads are entirely formed of plastic. The kit provides a mounted array state including a junction at which the mounting region of at least two of the PV modules are aligned and interconnected by engagement of the male connector with the female connector. The so-formed junction is substantially electrically insulated. The plurality of connectors can further include a spacer connector including a head forming a bore sized to slidably receive the male fastener, with all of the connector heads being identical.

  20. The paradox of federal energy and defense installations in the West

    SciTech Connect (OSTI)

    Pava, Daniel S

    2008-01-01

    Most planners working west of the 100th meridian are aware that federal lands make up a large portion of the lands in the western states. In fact, federal lands comprise nearly 49% of the area of the fourteen states that make up the WPR family. These lands are usually under the Department of Agriculture (USFS) and the Department of Interior (BLM and NPS), but the Departments of Defense (DOD) and Energy (DOE) are also federal stewards of western lands. These federal military and energy installations play an important role in local and regional western communities and economies. They also play an important role in regional ecologies. It is a paradox that some of these sites have their share of legacy contamination from earlier missions, but they also include some of the most pristine remaining western ecosystems. In some cases, the sites are located near or surrounded by encroaching urbanization, making them particularly valuable lands both for recreation and habitat preservation.