Sample records for installations cxs applied

  1. Apply

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternative FuelsSanta3Appliance andApplicationBerkeleyAppliedApply

  2. Tuition & Fee Installment Payment Plans -$25 non-refundable Enrollment Fee per plan applies and is due at the time of enrollment.

    E-Print Network [OSTI]

    a checking/savings account or from a credit card (a convenience fee applies for all credit card transactions that they save this under their favorites. The link is also located on the CSM Accounts

  3. CX-001247: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Categorical Exclusion Determination CX-001247: Categorical Exclusion Determination Biodiesel Tank Installation, Solar Installations, and Home Upgrades CX(s) Applied: A1, A9,...

  4. Client Configuration and Installation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Installation HSI Configuration and Installation Configuration Instructions This distribution has default configuration settings which will work for most environments. If...

  5. Sandia Energy - Installation Energy Security

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Installation Energy Security Home Stationary Power Grid Modernization Resilient Electric Infrastructures Military Installation Energy Security Installation Energy SecurityTara...

  6. Energy Saving 'Cool Roofs' Installed at Y-12 | National Nuclear...

    National Nuclear Security Administration (NNSA)

    Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at NNSA Blog Home NNSA Blog Energy Saving 'Cool Roofs' Installed at Y-12 Energy Saving 'Cool Roofs' Installed at Y-12...

  7. Installation and Acceptance Stage

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-05-21T23:59:59.000Z

    This chapter addresses activities required to install the software, data bases, or data that comprise the software product onto the hardware platform at sites of operation.

  8. HVAC Installed Performance

    Broader source: Energy.gov [DOE]

    This presentation was given at the Summer 2012 DOE Building America meeting on July 25, 2012, and addressed the question ŤHVAC proper installation energy savings: over-promising or under-delivering?"

  9. CX-010258: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Bangladesh Meteorological Instrumentation Installation CX(s) Applied: A9 Date: 04/26/2013 Location(s): Colorado Offices(s): Golden Field Office

  10. CX-011237: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Lightspeed Networks Inc. Fiber Installation CX(s) Applied: B4.9 Date: 10/24/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

  11. CX-012724: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Advanced Test Reactor (ATR) Electronic Message Board Installation CX(s) Applied: B1.7Date: 41830 Location(s): IdahoOffices(s): Nuclear Energy

  12. CX-010057: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Eugene Substation Protective Relay Installation CX(s) Applied: B1.7 Date: 01/29/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

  13. CX-011634: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Closure Turf Installation CX(s) Applied: B6.1 Date: 08/27/2013 Location(s): Texas Offices(s): Pantex Site Office

  14. CX-012247: Categorical Exclusion Determination | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Determination CX-012247: Categorical Exclusion Determination Installation of Solar Photovoltaic Systems CX(s) Applied: A9, B5.16 Date: 06182014 Location(s): Wisconsin, Wisconsin...

  15. CX-000571: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Categorical Exclusion Determination CX-000571: Categorical Exclusion Determination Photovoltaic Panel Installation (Building 833, TA-I) CX(s) Applied: B5.1 Date: 12102009...

  16. CX-004002: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Determination Knoxville Solar America Cites - Knox Heritage, Incorporated Solar Photovoltaic and Solar Thermal Demonstration Installation CX(s) Applied: B5.1 Date: 09202010...

  17. CX-000924: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    National Accreditation Certification Program for Installation and Acceptance of Photovoltaic Systems CX(s) Applied: A9 Date: 02232010 Location(s): New York Office(s): Energy...

  18. CX-003853: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Energy Efficiency and Conservation Block Grant (EECBG) - Sherman - Geothermal Heat Pump Installation CX(s) Applied: B5.1 Date: 09072010 Location(s): Sherman, Connecticut...

  19. CX-003717: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    CX-003717: Categorical Exclusion Determination Residential Ground Source Heat Pump Installation - Walter CX(s) Applied: B5.1 Date: 09152010 Location(s): Minnesota...

  20. CX-003715: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    CX-003715: Categorical Exclusion Determination Residential Ground Source Heat Pump Installation - Staus CX(s) Applied: B5.1 Date: 09152010 Location(s): Minnesota...

  1. CX-001512: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Categorical Exclusion Determination Birmingham Recreation Center Ground Source Heat Pump Installation CX(s) Applied: A9, B5.1 Date: 04012010 Location(s): Birmingham,...

  2. CX-006083: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Exclusion Determination CX-006083: Categorical Exclusion Determination Ground Source Heat Pump Installation - Lac Qui Parle County Courthouse, Minnesota CX(s) Applied: B5.1 Date:...

  3. CX-004348: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Categorical Exclusion Determination State Energy Program Residential Ground Source Heat Pump Installations (6) CX(s) Applied: B5.1 Date: 10272010 Location(s): Prior Lake,...

  4. CX-003986: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Categorical Exclusion Determination State Energy Program Residential Ground Source Heat Pump Installation - Korf CX(s) Applied: B5.1 Date: 09212010 Location(s): Minnesota...

  5. CX-004545: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Categorical Exclusion Determination State Energy Program - Residential Ground Source Heat Pump Installation - Dalager CX(s) Applied: B5.1 Date: 11242010 Location(s): Minnesota...

  6. CX-004539: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Categorical Exclusion Determination State Energy Program - Residential Ground Source Heat Pump Installation - Binford, Eric CX(s) Applied: B5.1 Date: 11242010 Location(s):...

  7. CX-009579: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Exclusion Determination CX-009579: Categorical Exclusion Determination Wind Turbine Installation for Town of Drummond CX(s) Applied: B5.18 Date: 12192012 Location(s):...

  8. CX-003979: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    CX-003979: Categorical Exclusion Determination Tuscola North Plant 100 Kilowatt Wind Turbine Installation CX(s) Applied: B5.1 Date: 09222010 Location(s): Tuscola, Illinois...

  9. CX-004223: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Center for Integrated Nanotechnologies Gateway - Installation and Operation of Computer Workstation Cluster, Los Alamos National Laboratory CX(s) Applied: B1.3 Date: 0519...

  10. CX-008011: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Determination CX-008011: Categorical Exclusion Determination Install EMSL Super-Computer Power Infrastructure CX(s) Applied: B1.7 Date: 06302011 Location(s): Washington...

  11. Automated solar collector installation design

    DOE Patents [OSTI]

    Wayne, Gary; Frumkin, Alexander; Zaydman, Michael; Lehman, Scott; Brenner, Jules

    2014-08-26T23:59:59.000Z

    Embodiments may include systems and methods to create and edit a representation of a worksite, to create various data objects, to classify such objects as various types of pre-defined "features" with attendant properties and layout constraints. As part of or in addition to classification, an embodiment may include systems and methods to create, associate, and edit intrinsic and extrinsic properties to these objects. A design engine may apply of design rules to the features described above to generate one or more solar collectors installation design alternatives, including generation of on-screen and/or paper representations of the physical layout or arrangement of the one or more design alternatives.

  12. Underground Storage Tank Regulations for the Certification of Persons Who Install, Alter, and Remove Underground Storage Tanks (Mississippi)

    Broader source: Energy.gov [DOE]

    The Underground Storage Tank Regulations for the Certification of Persons who Install, Alter, and Remove Underground Storage Tanks applies to any project that will install, alter or remove...

  13. VAX/ASPEN installation guide

    SciTech Connect (OSTI)

    Williams, K.E.

    1984-11-01T23:59:59.000Z

    Information necessary to install the ASPEN computerized simulation program on the VAX system is provided.

  14. Sandia Energy - Installation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Scienceand RequirementsCoatingsUltra-High-VoltagePower Company'sInAs QuantumInstallation Home

  15. Enhanced Control Installations.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    correctness. Title: Individual Permit, High Priority Sites, Examples of Enhanced Control Installations, Poster, Individual Permit for Storm Water, NPDES Permit No. NM0030759...

  16. Safety Culture in Nuclear Installations

    Broader source: Energy.gov [DOE]

    IAEA-TECDOC-1329 Safety Culture in Nuclear Installations, Guidance for use in the Enhancement of Safety Culture, International Atomic Energy Agency IAEA, December 2002.

  17. Transforming PV Installations toward Dispatchable, Schedulable...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transforming PV Installations toward Dispatchable, Schedulable Energy Solutions Transforming PV Installations toward Dispatchable, Schedulable Energy Solutions Advanced Energy...

  18. Magnet Girder Assembly and Installation

    SciTech Connect (OSTI)

    None

    2012-12-12T23:59:59.000Z

    It takes teamwork to assemble and install magnet girders for the storage ring of the National Synchrotron Light Source II. NSLS-II is now under construction at Brookhaven Lab.

  19. Magnet Girder Assembly and Installation

    ScienceCinema (OSTI)

    None

    2013-07-17T23:59:59.000Z

    It takes teamwork to assemble and install magnet girders for the storage ring of the National Synchrotron Light Source II. NSLS-II is now under construction at Brookhaven Lab.

  20. Net Zero Energy Installations (Presentation)

    SciTech Connect (OSTI)

    Booth, S.

    2012-05-01T23:59:59.000Z

    A net zero energy installation (NZEI) is one that produces as much energy from on-site renewable sources as it consumes. NZEI assessment provides a systematic approach to energy projects.

  1. Solar Installation Labor Market Analysis

    SciTech Connect (OSTI)

    Friedman, B.; Jordan, P.; Carrese, J.

    2011-12-01T23:59:59.000Z

    The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

  2. Process Improvement at Army Installations 

    E-Print Network [OSTI]

    Northrup, J.; Smith, E. D.; Lin, M.; Baird, J.

    1997-01-01T23:59:59.000Z

    ). Executive Orders require the Army to reduce the use of energy and related environmental impacts by promoting renewable energy technologies. These new energy and environmental directives usually exceed the performance capabilities of DODs currently installed...

  3. Data Mining using Python --exercises for installation

    E-Print Network [OSTI]

    ipython (e.g., by pip) Start with: ipython -pylab Once installed make sure you can write: In [1]: plot for installation Install IPython Notebook Check that you can run a IPython Notebook file. Test that the IPython

  4. Installation and Commissioning Automated Demand Response Systems

    E-Print Network [OSTI]

    Kiliccote, Sila; Global Energy Partners; Pacific Gas and Electric Company

    2008-01-01T23:59:59.000Z

    al: Installation and Commissioning Automated Demand ResponseConference on Building Commissioning: April 22 – 24, 2008al: Installation and Commissioning Automated Demand Response

  5. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in...

  6. Installation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHigh SchoolIn Other NewsSpin and Frame ofHowIG-0464the research

  7. Operation manual Installation Category I

    E-Print Network [OSTI]

    Kleinfeld, David

    Cary 50 Hardware Operation manual Installation Category I Pollution Degree 2 Safety Class 3 (EN-2:1991 IEC 801-3:1984 IEC 801-4:1988 Equipment Model Number Cary 50 Series Responsible Person in the EUUV software 4-13 5 Spare parts 5-1 #12;Cary 50 Publication date: 06/99 vii Safety practices and hazards Your

  8. Process Improvement at Army Installations

    E-Print Network [OSTI]

    Northrup, J.; Smith, E. D.; Lin, M.; Baird, J.

    recommendations are for the Fill and Press line where most of the Level I focused LESSONS LEARNED On completion of the project, the researchers assessed the results and some of the 198 ESL-IE-97-04-31 Proceedings from the Nineteenth Industrial Energy.... Finally, the energy issues included initiate an energy team; install energy efficient lighting; and decommission unused steam lines. After the first cost, savings, and simple payback time was calculated for all of the proposed improvements, a...

  9. STATE OF CALIFORNIA REFRIGERATED WAREHOUSE INSTALLATION CERTIFICATE

    E-Print Network [OSTI]

    STATE OF CALIFORNIA REFRIGERATED WAREHOUSE INSTALLATION CERTIFICATE CEC-RWH-INST (Revised 08 # BUILDING TYPE Refrigerated Warehouse PHASE OF CONSTRUCTION New Construction Addition Alteration If more By the Enforcement Agency #12;STATE OF CALIFORNIA REFRIGERATED WAREHOUSE INSTALLATION CERTIFICATE CEC

  10. Sandia Energy - Installation Energy Security

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Scienceand RequirementsCoatingsUltra-High-VoltagePower Company'sInAs QuantumInstallation

  11. An improved approximation algorithm for the uncapacitated facility location problem with service installation costs

    E-Print Network [OSTI]

    Zhang, Shuzhong

    installation costs Dachuan Xua,, , Shuzhong Zhangb a Department of Applied Mathematics, Beijing University of Technology, 100 Pingleyuan, Chaoyang District, Beijing 100022, P.R. China b Department of Systems Engineering In this paper, we study the uncapacitated facility location problem with service installation costs depending

  12. CX-012338: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Amargosa Substation (Conduit and Storage Pad Installation) CX(s) Applied: B1.3 Date: 06/03/2014 Location(s): Nevada Offices(s): Western Area Power Administration-Desert Southwest Region

  13. CX-011339: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install Blinds in 704-L Cafeteria CX(s) Applied: B1.3 Date: 09/19/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

  14. CX-011833: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Fiber Installation at Snohomish, SnoKing and Murray Substations CX(s) Applied: B4.7 Date: 01/27/2014 Location(s): Washington Offices(s): Bonneville Power Administration

  15. CX-011245: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Dixon Substation Fiber Optic Cable Installation CX(s) Applied: B4.7 Date: 09/24/2013 Location(s): Montana Offices(s): Bonneville Power Administration

  16. CX-010878: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Replace Big Hill Circuit Breakers OCB-4009, 4010, and 4011 (install) CX(s) Applied: B1.3 Date: 08/08/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office

  17. CX-012703: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    High-Efficiency Particulate Air (HEPA) Filter Installation in the Dry Transfer Cubicle Ventilation System CX(s) Applied: B2.5Date: 41870 Location(s): IdahoOffices(s): Nuclear Energy

  18. CX-012687: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Energy Systems Laboratory Process Demonstration Unit Pellet Mill Exhaust Stack Installation CX(s) Applied: B1.31Date: 41877 Location(s): IdahoOffices(s): Nuclear Energy

  19. CX-011723: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Happy Jack 230 Kilovolt Substation Fiber Optic Installation in Laramie County, Wyoming CX(s) Applied: B4.7 Date: 12/31/2013 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  20. CX-012297: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Wisconsin Biofuels Retail Availability Improvement Network (BRAIN) - E85 Station Installation CX(s) Applied: B5.22 Date: 06/03/2014 Location(s): Wisconsin Offices(s): National Energy Technology Laboratory

  1. CX-008759: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Information Operations & Research Center (IORC) Room E-6 Air Conditioner Unit Installation CX(s) Applied: B1.4 Date: 05/09/2012 Location(s): Idaho Offices(s): Idaho Operations Office

  2. CX-008978: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Parking Garage Gutter Replacement and Installation of Roof Ice Melt System CX(s) Applied: B2.3, B2.5 Date: 08/01/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory

  3. CX-011692: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Revenue Meter Installation at Wind River Biomass Facility CX(s) Applied: B1.7 Date: 12/30/2013 Location(s): Washington Offices(s): Bonneville Power Administration

  4. CX-004740: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    CX-004740: Categorical Exclusion Determination Install Amonix Panels at National Solar Thermal Test Facility CX(s) Applied: B5.1 Date: 11232010 Location(s): New Mexico...

  5. CX-008285: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    E85 (Ethanol) Retail Fueling Infrastructure Installation CX(s) Applied: B5.22 Date: 05/01/2012 Location(s): Florida Offices(s): National Energy Technology Laboratory

  6. CX-012071: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Archer Substation Microwave Building Fiber Optic Installation CX(s) Applied: B4.7 Date: 04/29/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  7. CX-009395: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Central Facilities Area (CFA)-696 Gasoline Tank Installation CX(s) Applied: B2.5 Date: 10/18/2012 Location(s): Idaho Offices(s): Nuclear Energy

  8. CX-011854: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Glen Canyon Substation 345 Kilovolt - Sulfur Hexafluoride and Concrete Pad Installation CX(s) Applied: B4.6 Date: 02/06/2014 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  9. CX-012401: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Equipment Installations at Multiple Substations and Radio Facilities CX(s) Applied: B1.7 Date: 07/14/2014 Location(s): Washington, Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration

  10. CX-010378: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of a Prefabricated 130 Square Feet Building Adjacent to Building 67 CX(s) Applied: B6.4 Date: 03/23/2011 Location(s): California Offices(s): Berkeley Site Office

  11. CX-007463: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Ohio Advanced Transportation Partnership/City of Columbus Electric Vehicle Charging Equipment Installation CX(s) Applied: B5.23 Date: 12/20/2011 Location(s): Ohio Offices(s): National Energy Technology Laboratory

  12. CX-012047: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Waste Tank 15H Riser 3-Foot-6-Inch Radar Level Detection System Installation CX(s) Applied: B2.2 Date: 03/31/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office

  13. CX-012193: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Slatt Substation Meter and Communication Equipment Installation CX(s) Applied: B1.7 Date: 05/05/2014 Location(s): Oregon Offices(s): Bonneville Power Administration

  14. CX-008171: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install Extension of the Underground Natural Gas Line From Its Current Termination Point CX(s) Applied: B5.5 Date: 03/13/2012 Location(s): New York Offices(s): Brookhaven Site Office

  15. CX-010686: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Cheyenne Substation KV2A 115-kilovolt Tie Line Installation CX(s) Applied: B4.6 Date: 07/02/2013 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  16. CX-009063: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of Roofing System on L Area Complex Building, Sections +91 and +148 CX(s) Applied: B1.3 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

  17. CX-008650: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install a New Roof, Building 735-A CX(s) Applied: B1.3 Date: 05/21/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

  18. CX-007909: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Exclusion Determination Ambler Boiler House Geothermal Wells, Cool Roof and Photovoltaic installation CX(s) Applied: B5.1, B5.16, B5.19 Date: 02082012 Location(s):...

  19. CX-001626: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Exclusion Determination Energy Efficiency and Conservation Block Grant: Solar Photovoltaic Installation at Knoxville Convention Center CX(s) Applied: B3.6, B5.1 Date: 0407...

  20. CX-007875: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Exclusion Determination Ambler Boiler House Geothermal Wells, Cool Roof and Photovoltaic installation CX(s) Applied: B5.1, B5.16, B5.19 Date: No date. Location(s):...

  1. CX-008460: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Ohio Advanced Transportation Partnership - Installation of Level 2 Electrical Vehicle Supply Equipment CX(s) Applied: B5.23 Date: 06/15/2012 Location(s): Ohio Offices(s): National Energy Technology Laboratory

  2. CX-008452: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Ohio Advanced Transportation Partnership - Installation of Level 2 Electrical Vehicle Supply Equipment CX(s) Applied: B5.23 Date: 06/18/2012 Location(s): Ohio Offices(s): National Energy Technology Laboratory

  3. CX-012322: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Storm Shelter Installation and Related Activities at the Weldon Spring, Missouri, Site CX(s) Applied: B1.15, B3.1 Date: 06/11/2014 Location(s): Missouri Offices(s): Legacy Management

  4. CX-012735: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Davis Dam Maintenance Building Installation at the old Davis Dam 69 Kilovolt West Switchyard CX(s) Applied: B4.11Date: 41820 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region

  5. CX-012345: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Collbran Substation Conduit Installation and Breaker Replacement, Mesa County, Colorado CX(s) Applied: B4.6 Date: 06/03/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  6. CX-012734: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Bouse Hills Pumping Plant to Harcuvar 115 Kilovolt Transmission Line, Inset Structure Installation CX(s) Applied: B4.6Date: 41878 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region

  7. CX-006822: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    CX-006822: Categorical Exclusion Determination Project 1803 - Install New Groundwater Pumping Well in Internal Revenue Service North Parking Lot CX(s) Applied: B3.1, B6.1 Date:...

  8. CX-010465: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Biofuel Retail Availability Improvement Network - Biodiesel Infrastructure Installation CX(s) Applied: B1.15, B5.1, B5.22 Date: 06/06/2013 Location(s): Wisconsin Offices(s): National Energy Technology Laboratory

  9. CX-010449: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Biofuel Retail Availability Improvement Network - Biodiesel Infrastructure Installation CX(s) Applied: B5.22 Date: 06/17/2013 Location(s): Wisconsin Offices(s): National Energy Technology Laboratory

  10. CX-010450: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Biofuel Retail Availability Improvement Network - Biodiesel Infrastructure Installation CX(s) Applied: B5.22 Date: 06/17/2013 Location(s): Wisconsin Offices(s): National Energy Technology Laboratory

  11. CX-008009: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Safety and Security Component Installation and Alteration CX(s) Applied: B1.11, B2.2 Date: 11/28/2011 Location(s): Washington Offices(s): Science, Pacific Northwest Site Office

  12. CX-011311: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Biofuels Retail Availability Improvement Network - E85 Infrastructure Installation CX(s) Applied: B5.22 Date: 10/07/2013 Location(s): Wisconsin Offices(s): National Energy Technology Laboratory

  13. CX-011310: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Biofuels Retail Availability Improvement Network - E85 Infrastructure Installation CX(s) Applied: B5.22 Date: 10/07/2013 Location(s): Wisconsin Offices(s): National Energy Technology Laboratory

  14. CX-009611: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Grounding Rod Installation at 663-F to Support Two Welding Machines CX(s) Applied: B1.15 Date: 11/27/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

  15. CX-009610: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Communication Line Installation Between Manhole F-39 and Building 221-12F CX(s) Applied: B1.7 Date: 11/27/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

  16. CX-008725: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    High Frequency Sounder - Permanent Installation at Water Reactor Research Test Facility CX(s) Applied: B1.19 Date: 07/11/2012 Location(s): Idaho Offices(s): Idaho Operations Office

  17. CX-010167: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install High Frequency Antennas at Bonneville Power Administration Maintenance Headquarters CX(s) Applied: B1.19 Date: 03/21/2013 Location(s): Oregon, Washington, Washington Offices(s): Bonneville Power Administration

  18. CX-008688: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of equipment at Wahkiakum Public Utility District’s Cathlamet Substation CX(s) Applied: B4.6 Date: 07/02/2011 Location(s): Washington Offices(s): Bonneville Power Administration

  19. CX-012001: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Meter Installation at Fossil Lake Solar Project CX(s) Applied: B1.7 Date: 04/24/2014 Location(s): Oregon Offices(s): Bonneville Power Administration

  20. CX-009509: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Power Monitoring, Communication and Control Upgrade at Bryan Mound Degas Plant (Install) CX(s) Applied: B1.7 Date: 10/31/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office

  1. CX-011223: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Bryan Mound Brine Disposal Pump Replacement (Install) CX(s) Applied: B5.2 Date: 10/28/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office

  2. CX-010504: Categorical Exclusion Determination | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CX-010504: Categorical Exclusion Determination Installation of Additional Wind Turbine and Tower at NWTC Site 3.2 CX(s) Applied: B5.18 Date: 06032013 Location(s):...

  3. CX-012381: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of a High Flux Thermal Neutron Source (HFTNS) CX(s) Applied: B2.5 Date: 05/21/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office

  4. CX-012385: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install Receptacles for Rooms 614 and 621 CX(s) Applied: B1.3 Date: 05/15/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office

  5. CX-012386: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    H-Area Vehicle Barrier Installation CX(s) Applied: B1.15 Date: 05/14/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office

  6. CX-012162: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install One Power Pole and Three Anchors Northwest of 704-1N CX(s) Applied: B1.3 Date: 04/29/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office

  7. CX-012171: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    735-11A French Drain Piping Installation CX(s) Applied: B1.3 Date: 04/16/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office

  8. CX-010311: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Tank 7 Center Riser Install/Remove Temporary Isolation Valve V-8 CX(s) Applied: B1.3 Date: 04/26/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

  9. CX-012568: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of H-Canyon 294-1H Process Air Supply Tunnel Manway Building CX(s) Applied: B1.15Date: 41863 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  10. CX-010098: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Phoenix to Lone Butte 230 Kilovolt Transmission Line, Bird Diverter Installation CX(s) Applied: B1.3 Date: 04/08/2013 Location(s): CX: none Offices(s): Western Area Power Administration-Desert Southwest Region

  11. CX-010486: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation Support of Supplemental Ventilation at Tank 15 CX(s) Applied: B2.5 Date: 05/29/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

  12. CX-012170: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install Condensate Release Valves on 108-1K Compressed Air System CX(s) Applied: B1.3 Date: 04/16/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office

  13. CX-009409: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Gering-Gering Valley 34.5 Kilovolt Transmission Line Underground Installation CX(s) Applied: B4.13 Date: 10/02/2012 Location(s): Nebraska Offices(s): Western Area Power Administration

  14. CX-006952: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Exclusion Determination CX-006952: Categorical Exclusion Determination Install Two New Steam Line Poles to Replace Poles K164 and K165 in 105-K Area CX(s) Applied: B1.3 Date:...

  15. Departments of Energy, Defense Partner to Install Fuel Cell Backup...

    Office of Environmental Management (EM)

    Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at...

  16. The Nuclear Installations (Dangerous Occurrences) Regulations 1965 

    E-Print Network [OSTI]

    Lee, Fred; Ross, William

    1965-01-01T23:59:59.000Z

    STATUTORY INSTRUMENTS 1965 No. 1824 ATOMIC ENERGY AND RADIOACTIVE SUBSTANCES LICENSING AND REGULATION OF SITES The Nuclear Installations (Dangerous Occurrences) Regulations 1965...

  17. EXHIBITIONS AND INSTALLATIONS ON UNIVERSITY PREMISES

    E-Print Network [OSTI]

    EXHIBITIONS AND INSTALLATIONS ON UNIVERSITY PREMISES Advice for Staff and Students HEALTH & SAFETY of heaters and appliances in rooms....................................... 7 6.4 Toxic risks and ventilation

  18. Photovoltaic Installations at Williams College Ruth Aronoff

    E-Print Network [OSTI]

    Aalberts, Daniel P.

    generation using solar power. Photovoltaic (PV) panel installations are a simple way for the College facilities, it is now evaluating in detail the environmental impact of these actions. In addition to making1 Photovoltaic Installations at Williams College Ruth Aronoff Williams Luce Project SUMMARY

  19. California Energy Commission Apply Today!

    E-Print Network [OSTI]

    including HVAC and thermal energy storage system upgrades, stadium light conversion and a microturbineCalifornia Energy Commission Apply Today! "The College implemented all of the recommended projects Programs Office (916) 654-4147 pubprog@energy.state.ca.us "CEC financing allowed us to install many

  20. Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.

    SciTech Connect (OSTI)

    Richards, Elizabeth H.; Schindel, Kay (City of Madison, WI); Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William (Lindau Companies, Inc., Hudson, WI); Harper, Alan (City of Madison, WI)

    2011-12-01T23:59:59.000Z

    Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

  1. STATE OF CALIFORNIA MECHANICAL INSTALLATION CERTIFICATE

    E-Print Network [OSTI]

    Alteration Unconditioned If more than one person has responsibility for building construction, each person responsible for construction (responsible person). · I certify that the installed features, materials) MECH-INST PROJECT NAME: DATE: ____________________ Building Permit ____________________ Checked by

  2. STATE OF CALIFORNIA ENVELOPE INSTALLATION CERTIFICATE

    E-Print Network [OSTI]

    Alteration Unconditioned If more than one person has responsibility for building construction, each person responsible for construction (responsible person). · I certify that the installed features, materials) ENV-INST PROJECT NAME: DATE: ____________________ Building Permit ____________________ Checked by

  3. Peoples Gas – Single Family Direct Install (Illinois)

    Broader source: Energy.gov [DOE]

    Owners of single-family homes, condos, townhomes and two-flats may be eligible for a free installation of new programmable thermostats, pipe insulation, showerheads, and faucet aerators through...

  4. Install Removable Insulation on Valves and Fittings

    SciTech Connect (OSTI)

    Not Available

    2006-01-01T23:59:59.000Z

    This revised ITP tip sheet on installing removable insulation on valves and fittings provides how-to advice for improving the system using low-cost, proven practices and technologies.

  5. Structural Code Considerations for Solar Rooftop Installations.

    SciTech Connect (OSTI)

    Dwyer, Stephen F.; Dwyer, Brian P.; Sanchez, Alfred

    2014-12-01T23:59:59.000Z

    Residential rooftop solar panel installations are limited in part by the high cost of structural related code requirements for field installation. Permitting solar installations is difficult because there is a belief among residential permitting authorities that typical residential rooftops may be structurally inadequate to support the additional load associated with a photovoltaic (PV) solar installation. Typical engineering methods utilized to calculate stresses on a roof structure involve simplifying assumptions that render a complex non-linear structure to a basic determinate beam. This method of analysis neglects the composite action of the entire roof structure, yielding a conservative analysis based on a rafter or top chord of a truss. Consequently, the analysis can result in an overly conservative structural analysis. A literature review was conducted to gain a better understanding of the conservative nature of the regulations and codes governing residential construction and the associated structural system calculations.

  6. AIR LEAKAGE OF NEWLY INSTALLED RESIDENTIAL WINDOWS

    E-Print Network [OSTI]

    Weidt, John

    2013-01-01T23:59:59.000Z

    Tables 2.0.2a 2.0.2b PAGE Air Leakage Through Sash/FrameOperation Types . . . . . Air Leakage of Installed WindowsComparison of Window Types Air Leakage Performance of

  7. Characterization of the Installed Costs of Prime Movers Using...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Installed Costs of Prime Movers Using Gaseous Opportunity Fuels, September 2007 Characterization of the Installed Costs of Prime Movers Using Gaseous Opportunity Fuels, September...

  8. U.S. Installation, Operation, and Performance Standards for Microturbi...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Installation, Operation, and Performance Standards for Microturbine Generator Sets, August 2000 U.S. Installation, Operation, and Performance Standards for Microturbine Generator...

  9. U.S. CHP Installations Incorporating Thermal Energy Storage ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CHP Installations Incorporating Thermal Energy Storage (TES) andor Turbine Inlet Cooling (TIC), September 2003 U.S. CHP Installations Incorporating Thermal Energy Storage (TES)...

  10. Database (Report) of U.S. CHP Installations Incorporating Thermal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Database (Report) of U.S. CHP Installations Incorporating Thermal Energy Storage (TES) andor Turbine Inlet Cooling (TIC), 2004 Database (Report) of U.S. CHP Installations...

  11. Solar Photovoltaic Installation Market Trends | OpenEI Community

    Open Energy Info (EERE)

    Solar Photovoltaic Installation Market Trends Home John55364's picture Submitted by John55364(95) Contributor 14 May, 2015 - 02:24 Global Solar Photovoltaic (PV) Installation...

  12. Purchase and Installation of a Geothermal Power Plant to Generate...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Purchase and Installation of a Geothermal Power Plant to Generate Electricity Using Geothermal Water Resources Purchase and Installation of a Geothermal Power Plant to Generate...

  13. Utility Scale Renewable Energy Development Near DOD Installations...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Scale Renewable Energy Development Near DOD Installations: Making the Case for Land Use Compatitbility Utility Scale Renewable Energy Development Near DOD Installations: Making the...

  14. Floodplain Assessment for Installation of a Renewable Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Installation of a Renewable Energy Anaerobic Digester Facility Floodplain Assessment for Installation of a Renewable Energy Anaerobic Digester Facility Floodplain Assessment...

  15. Experiences from the offshore installation of a composite materials firewater system

    SciTech Connect (OSTI)

    Ciaraldi, S.W. [Amoco Norway Oil Co., Stavanger (Norway). Production Dept.

    1993-12-31T23:59:59.000Z

    A prototype 300 m composite dry deluge firewater system was installed in December 1991 at the Valhall Field in the southern North Sea Norwegian offshore sector. This installation followed successful safety verification of the explosion and fire resistant design concept consisting of glass-fiber reinforced epoxy (GRE) piping components protected with a reinforced intumescent epoxy fire insulation. The installation was based primarily on the use of prefabricated GRE piping spools and fire insulation cast onto the piping or applied in the form of cast half shells. Significant experiences gained from the project are described. These experiences involve pre-engineering activities, detailed engineering, onshore fabrication, shipping, offshore hook-up, quality assurance, safety and economics. Although the overall installation was successful and the system is functioning as intended, areas of possible optimization and cost reduction for future composite firewater systems were identified. These findings are also briefly reviewed.

  16. DOD low energy model installation program

    SciTech Connect (OSTI)

    Fournier, D.F. Jr.

    1994-12-31T23:59:59.000Z

    The Model Low Energy Installation Program is a demonstration of an installation-wide, comprehensive energy conservation program that meets the Department of Defense (DOD) energy management goals of reducing energy usage and costs by at least 20%. It employs the required strategies for meeting these goals, quantifies the environmental compliance benefits resulting from energy conservation and serves as a prototype for DOD wide application. This project will develop both analysis tools and implementation procedures as well as demonstrate the effectiveness of a comprehensive, coordinated energy conservation program based on state-of-the-art technologies.

  17. STATE OF CALIFORNIA INDOOR LIGHTING INSTALLATION CERTIFICATE

    E-Print Network [OSTI]

    # BUILDING TYPE Nonresidential High-Rise Residential Hotel/Motel Guest Room PHASE OF CONSTRUCTION New Construction Addition Alteration Unconditioned If more than one person has responsibility for building responsible for construction (responsible person). · I certify that the installed features, materials

  18. Low-Cost Installation of Concentrating Photovoltaic

    E-Print Network [OSTI]

    .5 megawatt power plant for the Pacific Gas and Electric Company near Tracy, CA ­ the first solar related with system components, and traditional solar designs that limit installation locations. Many offerings. Currently, no solar company provides a complete photovoltaic or concentrating photovoltaic

  19. Page 1 of 8 Installation Name ____________________________________________________________

    E-Print Network [OSTI]

    US Army Corps of Engineers

    to aid in evaluating the overall performance of ground water extraction systems designed and installed of the subsurface performance of a ground water extraction system and the identification of the need for system of alternatives) 2) Typical Treatment Objectives There are two typical objectives for ground water extraction

  20. Page 1 of 6 Installation Name ____________________________________________________________

    E-Print Network [OSTI]

    US Army Corps of Engineers

    information Coordinate this checklist with the Ground Water Extraction System Subsurface Performance Well Design, Installation, and Documentation at HTRW Sites ETL 1110-1-201: Ground Water Extraction ASTM to aid in evaluating the performance and maintenance of extraction, injection, and monitoring wells

  1. TRS-Fiber Optic Classifier Sensor Installation

    E-Print Network [OSTI]

    Prevedouros, Panos D.

    TRS-Fiber Optic Classifier Sensor Installation The sensor that the Traffic Recording System (TRS) uses is the Flexsense Portable Fiberoptic Sensor System by Optical Sensor Systems. This includes two is undetected by the TRS. The user must make sure that the sensors do not get bent or twisted or the fiber optic

  2. IEA HPP Annex 36 Installation/Quality

    E-Print Network [OSTI]

    Oak Ridge National Laboratory

    on installation of air to air heat pump The aim is to use an ergonomic approach, in order to reduce Laboratory European Heat Pump Summit Nuremberg, Germany October 15, 2013 #12;3 Managed by UT), USA 3 10-11 October 2013 EdF, France 4 12 May 2014 Workshop at IEA Heat Pump conference, Montreal

  3. Installing Small Wind Turbines Seminar and Workshop

    E-Print Network [OSTI]

    Seminar and Workshop Installing Small Wind Turbines Seminar and Workshop Location: Murdoch January 2011 Details for Registration and Payment: Mr Daniel Jones, National Small Wind Turbine Test: The National Small Wind Turbine Centre at Murdoch University is holding a Small Wind Turbine short training

  4. Portland Advancing Green Image With Solar Installs

    Broader source: Energy.gov [DOE]

    A quick Internet search reveals that many sources consider Portland, Ore., to be one of the most green-minded cities in the United States. But large upfront costs have been a barrier for citizens looking to install solar power systems in the past. Now, a neighborhood solar initiative is helping communities organize to get solar discounts, meaning the city could become even greener.

  5. Computer Lab Software Installation Policy for the Metropolitan Instructional Support Laboratory

    E-Print Network [OSTI]

    Computer Lab Software Installation Policy for the Metropolitan Instructional Support Laboratory Laboratory (MISL) provides computer lab space for faculty, staff and student use as individuals or in classes on lab computers. This policy applies to both stationary and portable lab computers. Policy: Scenario 1

  6. Planning a Commercial Fuel Cell Installation

    E-Print Network [OSTI]

    Bowden, J. R.; May, G. W.

    PLANNING A COMMERCIAL FUEL CELL INSTALLATION J. R.Bowden & G. W. May Bechtel National, Inc. San Francisco, California Fuel cell power plants represent a unique opportunity for industrial users to combine on-site electricity generation... and heat recovery with high efficiencies and no significant environmental releases. Thus in some circumstances, the fuel cell may be the best option for industrial cogeneration in locations with environmental restrictions. Because of the modular...

  7. Manuel pour installer une station sismologique OSIRIS

    E-Print Network [OSTI]

    Perrot, Julie

    installation Tout d'abord, enterrer le sismom`etre, s'assurer de l'horizontalit´e du sismo c'est-`a-dire, bulle le c^able sur le sismo, v´erifier de nouveau l'horizontalit´e. GPS Batterie ` Station d "sismo" puis cd osiris puis ./nrtd -set eth0 #12;7- Lancer Firefox (web browser) depuis la barre de menu

  8. Section 690.64 of the National Electrical Code (NEC) continues to puzzle inspectors and installers with the requirements that

    E-Print Network [OSTI]

    Johnson, Eric E.

    different scenarios to consider, such connecting one or more inverters or strings of microinverters or AC PV at inverter, then 690.64(B) applies. Code Citations One or More Inverters Existing Disconnect or Added PV 690 and installers with the requirements that apply to the connection of grid-tied inverters to the premises wiring

  9. Energy Saving "Cool Roofs" Installed at Y-12 | National Nuclear...

    National Nuclear Security Administration (NNSA)

    Home Field Offices Welcome to the NNSA Production Office NPO News Releases Energy Saving "Cool Roofs" Installed at Y-12 Energy Saving "Cool Roofs" Installed at Y-12 The...

  10. Energy Department Launches SunShot Prize Competition to Install...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Launches SunShot Prize Competition to Install Solar Energy Systems at a Fraction of Today's Price Energy Department Launches SunShot Prize Competition to Install Solar Energy...

  11. Net Zero Energy Military Installations: A Guide to Assessment...

    Broader source: Energy.gov (indexed) [DOE]

    Net Zero Energy Military Installations: A Guide to Assessment and Planning Net Zero Energy Military Installations: A Guide to Assessment and Planning In 2008, DoD and DOE defined a...

  12. Solar Industry At Work: Streamlining Home Solar Installation...

    Broader source: Energy.gov (indexed) [DOE]

    Solar Industry At Work: Streamlining Home Solar Installation Solar Industry At Work: Streamlining Home Solar Installation June 12, 2012 - 11:59am Addthis Sunrun is a home solar...

  13. Infiniband cables installed | Argonne Leadership Computing Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHigh SchoolIn Other News link to facebookInfiniband cables installed

  14. NREL Job Task Analysis: Retrofit Installer Technician (Revised)

    SciTech Connect (OSTI)

    Kurnik, C.; Woodley, C.

    2012-04-01T23:59:59.000Z

    A summary of job task analyses for the position of retrofit installer technician when conducting weatherization work on a residence.

  15. A GUIDE TO PHOTOVOLTAIC (PV) SYSTEM DESIGN AND INSTALLATION

    E-Print Network [OSTI]

    CALIFORNIA ENERGY COMMISSION A GUIDE TO PHOTOVOLTAIC (PV) SYSTEM DESIGN AND INSTALLATION JUNE 2001 TO PHOTOVOLTAIC (PV) SYSTEM DESIGN AND INSTALLATION Prepared for: California Energy Commission Energy Technology installing photovoltaic (PV) systems under the Emerging Renewables Buydown Program. This is the first

  16. Performance of Installed Cooking Exhaust Devices

    SciTech Connect (OSTI)

    Singer, Brett C.; Delp, William W.; Apte, Michael G.; Price, Philip N.

    2011-11-01T23:59:59.000Z

    The performance metrics of airflow, sound, and combustion product capture efficiency (CE) were measured for a convenience sample of fifteen cooking exhaust devices, as installed in residences. Results were analyzed to quantify the impact of various device- and installation-dependent parameters on CE. Measured maximum airflows were 70% or lower than values noted on product literature for 10 of the devices. Above-the-cooktop devices with flat bottom surfaces (no capture hood) – including exhaust fan/microwave combination appliances – were found to have much lower CE at similar flow rates, compared to devices with capture hoods. For almost all exhaust devices and especially for rear-mounted downdraft exhaust and microwaves, CE was substantially higher for back compared with front burner use. Flow rate, and the extent to which the exhaust device extends over the burners that are in use, also had a large effect on CE. A flow rate of 95 liters per second (200 cubic feet per minute) was necessary, but not sufficient, to attain capture efficiency in excess of 75% for the front burners. A-weighted sound levels in kitchens exceeded 57 dB when operating at the highest fan setting for all 14 devices evaluated for sound performance.

  17. Installation of an innovative remedial technology

    SciTech Connect (OSTI)

    Hines, B. [CDM Federal Programs Corp., Kevil, KY (United States)

    1995-12-31T23:59:59.000Z

    The major goal of the Lasagna{trademark} project was to design, construct, install, and operate an in situ remediation system in low-permeability soil. A new technology--the Lasagna process--uses electro-osmosis to move contaminated groundwater through treatment zones. The treatment zones are installed in contaminated soils, thereby forming an integrated in situ remedial process. Electro-osmosis, well known for its effectiveness and extremely low power consumption, uses a direct current to cause Groundwater to travel through low-permeability soil. When a bench-scale version of the technology was 98 percent effective in removing contamination, an actual field test was the next step. The site chosen for this first field effort was the DOE-owned Paducah Gaseous Diffusion Plant located in Paducah, Kentucky. The target contaminant for this project was trichloroethylene (TCE) because it is found at many sites across the country and is present at approximately 60 percent of DOE`s sites.

  18. Case studies of six high priority DOD installations

    SciTech Connect (OSTI)

    NONE

    1994-11-01T23:59:59.000Z

    This is a supplement to the report entitled Environmental Cleanup: Too Many High Priority Sites Impede DOD`s Program. It provides six installation case studies addressing issues including the status of the restoration program, the cost of cleanup to date and projected costs, the cleanup options considered, the option selected, expected completion, and the applicable cleanup standards. The case studies also provide installation specific information on reasons installation was listed on the NPL, the regulatory process, cooperation between the installation and the regulatory agencies, staffing at the installations and the regulatory agencies, and the process for funding the cleanup.

  19. Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006

    E-Print Network [OSTI]

    2008-01-01T23:59:59.000Z

    on U.S. Wind Power Installation, Cost, and Performanceand Capital Costs Drive Wind Power Prices. . . . . 14Figure 18. Installed Wind Project Costs over Time Installed

  20. Installation package for a Sunspot Cascade Solar Water Heating System

    SciTech Connect (OSTI)

    None

    1980-09-01T23:59:59.000Z

    Elcam, Incorporated of Santa Barbara, California, has developed two solar water heating systems. The systems have been installed at Tempe, Arizona and San Diego, California. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank and controls. General guidelines are provided which may be utilized in development of detailed instalation plans and specifications. In addition, it provides instruction on operation, maintenance and installation of solar hot water systems.

  1. NMDOT Application for Permit to Install Utility Facilities Within...

    Open Energy Info (EERE)

    Reference LibraryAdd to library Legal Document- OtherOther: NMDOT Application for Permit to Install Utility Facilities Within Public ROWLegal Published NA Year Signed or Took...

  2. SMART Wind Consortium Virtual Meeting on Installation: Reducing...

    Broader source: Energy.gov (indexed) [DOE]

    foster dialogue on actions to improve safety and efficiency and to reduce installation costs for distributed wind turbines. Gary Harcourt of Great Rock Windpower will discuss the...

  3. Net Zero Energy Military Installations: A Guide to Assessment...

    Broader source: Energy.gov (indexed) [DOE]

    Net Zero Energy Military Installations: A Guide to Assessment and Planning Samuel Booth, John Barnett, Kari Burman, Josh Hambrick and Robert Westby Technical Report NREL...

  4. Study Guide for Photovoltaic System Installers and Sample Examination...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    some of the basic cognitive material that individuals who install and maintain PV systems should understand. This information is intended primarily as a study guide to help...

  5. Permit for Charging Equipment Installation: Electric Vehicle Supply Equipment (EVSE)

    Broader source: Energy.gov [DOE]

    Jurisdiction's can use this template to develop a standard permit for residential charging stations that allows for quick, safe installation of EVSE.

  6. Electric Vehicle Grid Integration for Sustainable Military Installations (Presentation)

    SciTech Connect (OSTI)

    Simpson, M.

    2011-05-05T23:59:59.000Z

    This presentation discusses electric vehicle grid integration for sustainable military installations. Fort Carson Military Reservation in Colorado Springs is used as a case study.

  7. Reviewing Post-Installation and Annual Reports for Federal ESPC...

    Broader source: Energy.gov (indexed) [DOE]

    uniform and consistent reviews of post-installation and annual reports for federal ESPC projects. These procedures will allow for consistent evaluations of performance...

  8. Learning-by-Doing in Solar Photovoltaic Installations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BOS? Many argue significant LBD in the installation of solar PV. E.g., the California Solar Initiative was motivated by both environmental externalities and LBD spillovers at...

  9. H2-Assisted NOx Traps: Test Cell Results Vehicle Installations

    Broader source: Energy.gov (indexed) [DOE]

    Sam Crane August 28, 2003 H 2 -Assisted NOx Traps: Test Cell Results Vehicle Installations 2 Project Objectives * Determine Advantages of H 2 Assisted NO x Trap Regeneration *...

  10. Plug and Play: Purchase, Install, and Connect Residential Solar...

    Energy Savers [EERE]

    roof mounting system, eliminating the need for racking systems. Once the lightweight solar panels are in place, the system then self-tests for proper installation and...

  11. The Nuclear Installations (Dangerous Occurrences )(Amendment) Regulations 1963 

    E-Print Network [OSTI]

    Wood, Richard; Noble, Michael

    1963-01-01T23:59:59.000Z

    STATUTORY INSTRUMENTS 1963 No. 1358 ATOMIC ENERGY AND RADIOACTIVE SUBSTANCES LICENSING AND REGULATION OF SITES The Nuclear Installations (Dangerous Occurrences) (Amendment) Regulations 1963...

  12. DOE-DOD Emergency Backup Power Fuel Cell Installations

    Fuel Cell Technologies Publication and Product Library (EERE)

    Ths fact sheet describes a collaboration between the departments of Energy and Defense to install and operate 18 fuel cell backup power systems across the United States.

  13. Utility Scale Renewable Energy Development Near DOD Installations...

    Broader source: Energy.gov (indexed) [DOE]

    Aimone, P.E. National Security Global Business Battelle Memorial Institute Utility Scale Renewable Energy Development near DOD Installations Making the Case for Land Use...

  14. CATEGORICAL EXCLUSION TO INSTALL EMSL SUPER-COMPUTER POWER INFRASTRUCT...

    Broader source: Energy.gov (indexed) [DOE]

    be available for future needs. The City of Richland would install the additional transformers as needed. 2. To get the electrical service in usable form to EMSL, Pacific...

  15. EFFICIENCY MAINE DIRECT INSTALLS INCREASE UPGRADE PACE | Department...

    Broader source: Energy.gov (indexed) [DOE]

    EFFICIENCY MAINE DIRECT INSTALLS INCREASE UPGRADE PACE Although Maine has one of the United States' highest homeownership rates, more than one-third of the state's residents...

  16. Global Solar Photovoltaic (PV) Installation Market to be Propelled...

    Open Energy Info (EERE)

    of humid climatic conditions and irregular intensities of solar radiations. The key companies operating in the global solar photovoltaic installation market are Trina Solar...

  17. Rhode Island Stormwater Design and Installation Standards Manual (Rhode Island)

    Broader source: Energy.gov [DOE]

    Rhode Island's stormwater design and installation standards manual has been developed to describe mandatory and suggested stormwater design and performance criteria for applicants to the Department...

  18. Oregon Construction/Installation Permit for Onsite Wastewater...

    Open Energy Info (EERE)

    Oregon ConstructionInstallation Permit for Onsite Wastewater Treatment System Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Oregon Construction...

  19. Helping Ensure High-Quality Installation of Solar Power Technologies...

    Energy Savers [EERE]

    both more accessible and affordable. With EERE support, MREA will provide instructor development opportunities and also create sustainable jobs within the solar installation...

  20. Microsoft Word - CX-Ashe-CGSFiberInstallation_WEB.doc

    Broader source: Energy.gov (indexed) [DOE]

    5, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Debbie Ruckwardt Electrical Engineer - TEP-CSB-1 Proposed Action: Installing fiber optic cables between...

  1. Consider Installing High-Pressure Boilers with BackpressureTurbine...

    Broader source: Energy.gov (indexed) [DOE]

    High-Pressure Boilers with Backpressure Turbine-Generators Consider Installing High-Pressure Boilers with Backpressure Turbine-Generators This tip sheet outlines the benefits of...

  2. Upcoming Funding Opportunity for Tower Manufacturing and Installation...

    Energy Savers [EERE]

    intends to support partnerships that lead to innovative designs and processes for wind turbine tower manufacturing and turbine system installation. Supported projects will develop...

  3. applicable aux installations: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ronald E. Jeffries; Ann Anderson; Chet Hendrickson; Chapter Circle Of Life 2000-01-01 97 STATE OF CALIFORNIA INDOOR LIGHTING INSTALLATION CERTIFICATE Energy Storage, Conversion...

  4. Building America Expert Meeting: Achieving the Best Installed...

    Energy Savers [EERE]

    the impact of installation practices on the efficiency and long-term durability of the furnace. exptmtgresidgasfurnaces.pdf More Documents & Publications Building America...

  5. ANALYSIS OF VARIABILITY IN PRECASTING AND INSTALLATION OF PILE FOUNDATIONS

    E-Print Network [OSTI]

    Tommelein, Iris D.

    1 ANALYSIS OF VARIABILITY IN PRECASTING AND INSTALLATION OF PILE FOUNDATIONS Hasan Kaplan1-stressed precast foundation piles using data collected on a building project that comprised the installation of more than 340 piles. The objective is to assess the presence of product and process variability

  6. Net Zero Energy Military Installations: A Guide to

    E-Print Network [OSTI]

    Net Zero Energy Military Installations: A Guide to Assessment and Planning Samuel Booth, John;Technical Report Net Zero Energy Military NREL/TP-7A2-48876 Installations: A Guide to August 2010 Assessment .......................................................................................................................................1 1 Introduction: Net Zero Energy In DoD Context

  7. Targeting Net Zero Energy for Military Installations (Presentation)

    SciTech Connect (OSTI)

    Burman, K.

    2012-05-01T23:59:59.000Z

    Targeting Net Zero Energy for Military Installations in Kaneohe Bay, Hawaii. A net zero energy installation (NZEI) is one that produces as much energy from on-site renewable sources as it consumes. NZEI assessment provides a systematic approach to energy projects.

  8. Establishing and Sustaining System Integrity via Root of Trust Installation

    E-Print Network [OSTI]

    McDaniel, Patrick Drew

    integrity. The TPM-based integrity measurement approaches are effective for measuring well-known, staticEstablishing and Sustaining System Integrity via Root of Trust Installation Abstract Integrity the management of a system's integrity, we propose a Root of Trust Installation (ROTI) as a foundation for high

  9. IBM Systems Director Active Energy Manager Installation and User's Guide

    E-Print Network [OSTI]

    instructions for using IBM® Systems Director Active Energy Manager software to monitor and manage where powerIBM Systems Director Active Energy Manager Installation and User's Guide Version 4.3 #12;#12;IBM Systems Director Active Energy Manager Installation and User's Guide Version 4.3 #12;ii IBM Systems

  10. Study Guide for Photovoltaic System Installers and Sample Examination Questions

    Broader source: Energy.gov [DOE]

    This study guide presents some of the basic cognitive material that individuals who install and maintain PV systems should understand. This information is intended primarily as a study guide to help better prepare for the NABCEP PV installer examination but does not provide all of the information needed for completing the certification examination.

  11. IBM Systems Director VMControl Installation and User's Guide

    E-Print Network [OSTI]

    IBM Systems Director VMControl Installation and User's Guide Version 2 Release 2 #12;#12;IBM Systems Director VMControl Installation and User's Guide Version 2 Release 2 #12;ii IBM Systems Director read this book . . . . . . . . . 1 Conventions and terminology . . . . . . . . 1 Chapter 2. IBM Systems

  12. Preliminary assessment report for Olney Military Reservation, Installation 24175, Olney, Maryland. Installation Restoration Program

    SciTech Connect (OSTI)

    Hansen, J.; Rose, C.

    1993-07-01T23:59:59.000Z

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Maryland Army National Guard property near Olney, Maryland. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies Phase I of the US Department of Defense Installation Restoration Program for Olney Military Reservation property. Olney Military Reservation is an 8-acre site located in the southwestern portion of Maryland, about six miles northwest of Washington, DC, in Montgomery County. The major facilities included in this PA comprise the administration building, barracks, and motor repair shops. The environmentally significant operations associated with the property are underground and aboveground storage tanks, a vehicle wash rack, a flammable materials storage area (a lean-to structure), and a hazardous materials storage building. The review of both historical and current practices at the property indicates that Olney Military Reservation property poses no immediate threat to human health or the environment. Argonne`s reviewers noted several historical potential threats to the environment that have occurred at the property that installation personnel have corrected or eliminated.

  13. Apparatus for installing condition-sensing means in subterranean earth formations

    DOE Patents [OSTI]

    Shuck, Lowell Z. (Morgantown, WV)

    1981-01-01T23:59:59.000Z

    The present invention is directed to an apparatus for installing strain gages or other sensors-transducers in wellbores penetrating subterranean earth formations. The subject apparatus comprises an assembly which is lowered into the wellbore, secured in place, and then actuated to sequentially clean the wellbore or casing surface at a selected location with suitable solvents, etchants and neutralizers, grind the surface to a relatively smooth finish, apply an adhesive to the surface, and attach the strain gages or the like to the adhesive-bearing surface. After installing the condition-sensing gages to the casing or earth formation the assembly is withdrawn from the wellbore leaving the sensing gages securely attached to the casing or the subterranean earth formation.

  14. Installation and Commissioning Automated Demand Response Systems

    SciTech Connect (OSTI)

    Global Energy Partners; Pacific Gas and Electric Company; Kiliccote, Sila; Kiliccote, Sila; Piette, Mary Ann; Wikler, Greg; Prijyanonda, Joe; Chiu, Albert

    2008-04-21T23:59:59.000Z

    Demand Response (DR) can be defined as actions taken to reduce electric loads when contingencies, such as emergencies and congestion, occur that threaten supply-demand balance, or market conditions raise supply costs. California utilities have offered price and reliability DR based programs to customers to help reduce electric peak demand. The lack of knowledge about the DR programs and how to develop and implement DR control strategies is a barrier to participation in DR programs, as is the lack of automation of DR systems. Most DR activities are manual and require people to first receive notifications, and then act on the information to execute DR strategies. Levels of automation in DR can be defined as follows. Manual Demand Response involves a labor-intensive approach such as manually turning off or changing comfort set points at each equipment switch or controller. Semi-Automated Demand Response involves a pre-programmed demand response strategy initiated by a person via centralized control system. Fully-Automated Demand Response does not involve human intervention, but is initiated at a home, building, or facility through receipt of an external communications signal. The receipt of the external signal initiates pre-programmed demand response strategies. We refer to this as Auto-DR (Piette et. al. 2005). Auto-DR for commercial and industrial facilities can be defined as fully automated DR initiated by a signal from a utility or other appropriate entity and that provides fully-automated connectivity to customer end-use control strategies. One important concept in Auto-DR is that a homeowner or facility manager should be able to 'opt out' or 'override' a DR event if the event comes at time when the reduction in end-use services is not desirable. Therefore, Auto-DR is not handing over total control of the equipment or the facility to the utility but simply allowing the utility to pass on grid related information which then triggers facility defined and programmed strategies if convenient to the facility. From 2003 through 2006 Lawrence Berkeley National Laboratory (LBNL) and the Demand Response Research Center (DRRC) developed and tested a series of demand response automation communications technologies known as Automated Demand Response (Auto-DR). In 2007, LBNL worked with three investor-owned utilities to commercialize and implement Auto-DR programs in their territories. This paper summarizes the history of technology development for Auto-DR, and describes the DR technologies and control strategies utilized at many of the facilities. It outlines early experience in commercializing Auto-DR systems within PG&E DR programs, including the steps to configure the automation technology. The paper also describes the DR sheds derived using three different baseline methodologies. Emphasis is given to the lessons learned from installation and commissioning of Auto-DR systems, with a detailed description of the technical coordination roles and responsibilities, and costs.

  15. Preliminary assessment report for Fort Custer Training Center, Installation 26035, Augusta, Michigan. Installation Restoration Program

    SciTech Connect (OSTI)

    Flaim, S.; Krokosz, M.

    1993-08-01T23:59:59.000Z

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Michigan Army National Guard property near Augusta, Michigan. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Fort Custer Training Center, phase I of the Department of Defense Installation Restoration Program. The environmentally significant operations associated with the property are (1) storage of hazardous materials and hazardous waste, (2) storage and dispensing of fuel, (3) washing of vehicles and equipment, and (4) weapons training ranges that may have accumulated lead.

  16. Preliminary assessment report for Fort Jacob F. Wolters, Installation 48555, Mineral Wells, Texas. Installation Restoration Program

    SciTech Connect (OSTI)

    Dennis, C.B.

    1993-08-01T23:59:59.000Z

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard (TXARNG) property near Mineral Wells, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Fort Wolters property, the requirement of the Department of Defense Installation Restoration Program.

  17. Preliminary assessment report for Camp Swift Military Reservation, Installation 48070, Bastrop County, Texas. Installation Restoration Program

    SciTech Connect (OSTI)

    Dennis, C.B.

    1993-08-01T23:59:59.000Z

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard property in Bastrop County, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Camp Swift property, the requirement of the Department of Defense Installation Restoration Program (IRP). The review of both historical and current practices at the property indicated that the activities at Camp Swift include no operations considered to have an adverse impact to the environment. The recommendation, therefore, is that no further IRP action is necessary at this property.

  18. Preliminary assessment report for National Guard Facility, Installation 25255, Rehoboth, Massachusetts. Installation Restoration Program

    SciTech Connect (OSTI)

    Haffenden, R.; Flaim, S.; Krokosz, M.

    1993-08-01T23:59:59.000Z

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Massachusetts Army National Guard (MAARNG) property known as the Rehoboth National Guard Facility (RNGF) in Rehoboth, Massachusetts. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for ftirther action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the RNGF property, phase I of the Department of Defense Installation Restoration Program (IRP). The scope of this assessment is limited to the facilities under the control of the MAARNG and the past activities contained within that area.

  19. New Jersey SmartStart Buildings- Direct Install Program

    Broader source: Energy.gov [DOE]

    The Direct Install program offers turn-key energy efficiency solutions to qualified industrial and commercial customers that, with some exceptions, have a peak electricity demand of 150 kilowatts ...

  20. Minimum Cost Capacity Installation for Multicommodity Network Flows \\Lambda

    E-Print Network [OSTI]

    Bienstock, Daniel

    Capacity Installation (MCCI) problem. Applications of MCCI are commonly seen in the design for MCCI and then we transform this for­ mulation to a lower dimensional space by projecting out all

  1. Global Installed Capacity of Coal Fired Power Generation to Reach...

    Open Energy Info (EERE)

    Global Installed Capacity of Coal Fired Power Generation to Reach 2,057.6 GW by 2019 Home > Groups > Increase Natural Gas Energy Efficiency John55364's picture Submitted by...

  2. Installing a Subsurface Drip Irrigation System for Row Crops

    E-Print Network [OSTI]

    Enciso, Juan

    2004-09-07T23:59:59.000Z

    This publication describes the components of a subsurface drip irrigation system and the procedure for installing such a system. Each step is outlined and illustrated. Steps include tape injection, trenching, connecting drip lines, back...

  3. berkeleyengineering First-generation airbags, installed in motor

    E-Print Network [OSTI]

    Agogino, Alice M.

    berkeleyengineering 8 9 First-generation airbags, installed in motor vehicles until 1998, decreased Berkeley ME professor Alice Agogino, is because women were not involved in early research, in which airbags

  4. Obama Administration Announces Plans to Install New Solar Panels...

    Broader source: Energy.gov (indexed) [DOE]

    WASHINGTON - U.S. Energy Secretary Steven Chu and Council of Environmental Quality (CEQ) Chair Nancy Sutley today announced plans to install solar panels and a solar hot water...

  5. NIPSCO Small Business Direct Install Electric and Natural Gas Program

    Broader source: Energy.gov [DOE]

    NIPSCO's Small Business Direct Install Program is designed to help small businesses minimize energy costs, and provides energy-saving CFL lighting, showerheads and faucet aerators at no added cost.

  6. Banner Job Installation Security Form Office of Information Technology

    E-Print Network [OSTI]

    Karsai, Istvan

    Banner Job Installation Security Form Office of Information Technology 424 Roy S. Nicks Hall, Box: ______________________________ Job Description: ______________________________ Section 3. Security Information Banner Module 70728 Johnson City, Tennessee 37614 (423) 439-4648 · oithelp@etsu.edu Section 1. Requestor Information

  7. Hindawi Publishing Corporation Science and Technology of Nuclear Installations

    E-Print Network [OSTI]

    Demazičre, Christophe

    Hindawi Publishing Corporation Science and Technology of Nuclear Installations Volume 2013, Article Department of Nuclear Chemistry, Chalmers University of Technology, 412 96 Gothenburg, Sweden 2 Department of Nuclear Engineering, Chalmers University of Technology, 412 96 Gothenburg, Sweden Correspondence should

  8. Hole in one: Technicians smoothly install the center stack in...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hole in one: Technicians smoothly install the center stack in the NSTX-U vacuum vessel By John Greenwald November 10, 2014 Tweet Widget Google Plus One Share on Facebook Closeup of...

  9. Video Installation Design: Appropriation and Assemblage As Projection Surface Geometry

    E-Print Network [OSTI]

    Weaver, Timothy A.

    2010-07-14T23:59:59.000Z

    This area of research focuses on the use of video projections in the context of fine art. Emphasis is placed on creating a unique video installation work that incorporates assemblage and appropriation as a means to develop multiple complex...

  10. Defense Energy Support Center: Installation Energy Commodity Business Unit

    Broader source: Energy.gov [DOE]

    Presentation—given at the Spring 2009 Federal Utility Partnership Working Group (FUPWG) meeting—discusses the Defense Energy Support Center's (DESC's) Installation Energy Commodity Business Unit (CBU) including its intent, commitment, pilot project, lessons learned, and impending barriers.

  11. VERA Installation Guide Roscoe A. Bartlett Mark Baird Mark Berrill

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    env just need to source the script, for example: source VERADEVENVBASEgcc-4.8.3loaddevenv.sh (in their .bashprofile file for instance). 8 Details on Installing VERA...

  12. Seeing solar on campus : a visible photovoltaic installation on campus

    E-Print Network [OSTI]

    Guarda, Daniel Jair Alves

    2006-01-01T23:59:59.000Z

    This paper presents a methodology for selecting a site on the MIT campus for a visible solar photovoltaic installation. Visibility, solar exposure, advertising potential, aesthetics, interactivity and direct or important ...

  13. TRINITY HALL HAS INSTALLED CCTV ON THESE PREMISES FOR

    E-Print Network [OSTI]

    Lasenby, Joan

    TRINITY HALL HAS INSTALLED CCTV ON THESE PREMISES FOR YOUR SAFETY AND PROTECTION #12; Trinity Hall Trinity Lane Cambridge CB2 1TJ Tel: 01223 33 25 00 For all enquiries and questions

  14. Offshore Wind Energy Market Installed Capacity is Anticipated...

    Open Energy Info (EERE)

    Offshore Wind Energy Market Installed Capacity is Anticipated to Reach 52,120.9 MW by 2022 Home > Groups > Renewable Energy RFPs Wayne31jan's picture Submitted by Wayne31jan(150)...

  15. North Shore Gas – Single Family Direct Install (Illinois)

    Broader source: Energy.gov [DOE]

    Owners of single-family homes, condos, townhomes and two-flats may be eligible for a free installation of new programmable thermostats, pipe insulation, showerheads, and faucet aerators through...

  16. Consider Installing Turbulators on Two- and Three-Pass Firetube...

    Broader source: Energy.gov (indexed) [DOE]

    tip sheet outlines the benefits of turbulators on firetube boilers as part of optimized steam systems. STEAM TIP SHEET 25 Consider Installing Turbulators on Two- and Three-Pass...

  17. Performance Testing of Window Installation and Flashing Details

    E-Print Network [OSTI]

    Weston, T. A.; Herrin, J.

    2002-01-01T23:59:59.000Z

    and proposed installation practices incorporating new flashing materials. This paper focuses specifically on the installation practices relating to windows with mounting fins or flanges. REVIEW OF CURRENT PRACTICES AND ATTITUDES Interviews with builders... into two categories based on the how the flashing and the rough opening is treated. g167g32 2-Dimensional Methods: using flashing to extend protection around the perimeter of the window flanges on to the face of the sheathing, and g167g32 3...

  18. Installation of a high-precision Kirsten Hacker

    E-Print Network [OSTI]

    Installation of a high-precision BPM in BC3 Kirsten Hacker 20-03-07 #12;BPM installed in BC2=T3*c dE/E=D/R16 EBPM T1 T2 T3 ~300mm 3um position resolution -> 1e-5 Energy resoution!!! BPM BPM #12;BPM for the Bunch Compressors beam stripline vacuumstripline vacuumStripline Vacuum Beam beam tapering

  19. SOLARIZE RALEIGH PILOT PROGRAM DRAFT Request for Proposals from Installers of Residential Solar Photovoltaic Systems

    E-Print Network [OSTI]

    solar photovoltaic ("PV") installation companies ("Installer(s)") or teams of installation companiesSOLARIZE RALEIGH PILOT PROGRAM DRAFT Request for Proposals from Installers of Residential Solar Photovoltaic Systems Proposed Posting Date: February 4, 2014 I. OPPORTUNITY SUMMARY: The North Carolina Solar

  20. CX-011718: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Electrical District 2 to Saguaro #2 115 Kilovolt Transmission Line, Marker Ball Installation at Structure 26-10. CX(s) Applied: B1.3 Date: 01/09/2014 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  1. CX-009161: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Energy Audit; Efficiency Improvements; and Renewable Energy Installations; Township of Branchburg, NJ CX(s) Applied: B5.1, B5.16, B5.23 Date: 09/14/2012 Location(s): New Jersey Offices(s): Golden Field Office

  2. CX-010406: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Davis Dam to Kingman Tap 69 Kilovolt Transmission Line, Overhead Optical Power Ground Wire Installation CX(s) Applied: B4.7 Date: 05/16/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  3. CX-008783: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Fiber Optic Installation at the Stegall 230 Kilovolt Substation Scotts Bluff County, Nebraska CX(s) Applied: B4.7 Date: 06/20/2012 Location(s): Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region

  4. CX-010846: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install Stud, Shims, and Nut in the L-Basin 70-Ton Cask Lid Support Structure CX(s) Applied: B2.5 Date: 07/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

  5. CX-009803: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Western's Power Marketing Operations Center New Fiber Optic Cable Installation CX(s) Applied: B1.31, B2.2, B4.7 Date: 01/16/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  6. CX-010773: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install Air Conditioning in the Fuel Manufacturing Facility (FMF) (Materials and Fuel Complex [MFC]-704) Security Police Officer (SPO) Office CX(s) Applied: B2.1 Date: 07/17/2013 Location(s): Idaho Offices(s): Nuclear Energy

  7. CX-012088: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Emergency Installation of Concrete Pad for Western's Communication Tower at Valley Farms Substation CX(s) Applied: B4.6 Date: 04/01/2014 Location(s): Arizona, Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  8. CX-012502: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Renovation of 920 Plateau West Parking Lot Drainage System and Wallace Road Curb Installation Project CX(s) Applied: B1.15, B1.33, B2.5Date: 41852 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory

  9. CX-006221: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Routine Monitoring, Maintenance, the Installation of Two Wells and General Site and Administrative Actions at the Bluewater, New Mexico, Disposal Site (LM Number 10 -11)CX(s) Applied: B1.3, B3.1Date: 06/24/2011Location(s): Bluewater, New MexicoOffice(s): Legacy Management

  10. CX-011700: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Optimal Power Buoy Structure Design for Maximized Power to Weight Ratio and Reduced Installed Capital Cost CX(s) Applied: A9, B3.6 Date: 01/15/2014 Location(s): New Jersey, New Jersey Offices(s): Golden Field Office

  11. CX-012334: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install Single Split System Air Conditioning Unit in Bryan Mound Building No. 281 (BM-OM-1229) CX(s) Applied: B1.4 Date: 06/30/2014 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office

  12. Renewable Energy Opportunities at the Kanto Installations, Japan

    SciTech Connect (OSTI)

    Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.; Gorrissen, Willy J.; Kora, Angela R.; Weimar, Mark R.; Hand, James R.; Orrell, Alice C.; Williamson, Jennifer L.

    2010-09-24T23:59:59.000Z

    This document provides an overview of renewable resource development potential at the U.S. Army installations in the Kanto region in Japan, which includes Camp Zama, Yokohama North Dock, Sagamihara Family Housing Area (SFHA), Sagami General Depot, and Akasaka Press Center. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the Huntsville Army Corps of Engineers, and includes the development of a methodology for renewable resource assessment at Army installations located on foreign soil. The methodology is documented in Renewable Energy Assessment Methodology for Japanese OCONUS Army Installations. The site visit to the Kanto installations took place on April 5 and 6, 2010. At the current time, there are some renewable technologies that show economic potential. Because of siting restrictions and the small size of these installations, development of most renewable energy technologies will likely be limited to Camp Zama. Project feasibility is based on installation-specific resource availability and energy costs and projections based on accepted life-cycle cost methods. Development of any renewable energy project will be challenging, as it will require investigation into existing contractual obligations, new contracts that could be developed, the legality of certain partnerships, and available financing avenues, which involves the U.S. Forces Japan (USFJ), the Government of Japan (GOJ), and a number of other parties on both sides. The Army will not be able to implement a project without involvement and approval from the other services and multiple levels of Japanese government. However, implementation of renewable energy projects could be an attractive method for GOJ to reduce greenhouse gas emissions and lower annual utility payments to USFJ. This report recommends projects to pursue and offers approaches to use. The most promising opportunities include waste-to-energy and ground source heat pumps. Solar photovoltaics (PV) may also prove successful. Other resources were found to be insufficient on the Kanto installations.

  13. Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006

    E-Print Network [OSTI]

    2008-01-01T23:59:59.000Z

    Type Cumulative Installed Capacity (GW) Utility Interest inin 2006 Cumulative Installed Capacity (GW) 7 projects 450 MWis based on AWEA/GEC installed capacity data for the end of

  14. Tracking the Sun V An Historical Summary of the Installed Price

    E-Print Network [OSTI]

    ..................................................................... 34 The Installed Price of Utility-Scale PV Varies Considerably Across Projects But Has Declined Overall ........... 35 The Installed Price of Utility-Scale Projects Depends on Project Size and System .......................................................... 14 Installed Prices Vary Widely Across Individual Projects

  15. Facebook Applications' Installation and Removal: A Temporal Analysis

    E-Print Network [OSTI]

    Kagan, Dima; Elyashar, Aviad; Elovici, Yuval

    2013-01-01T23:59:59.000Z

    Facebook applications are one of the reasons for Facebook attractiveness. Unfortunately, numerous users are not aware of the fact that many malicious Facebook applications exist. To educate users, to raise users' awareness and to improve Facebook users' security and privacy, we developed a Firefox add-on that alerts users to the number of installed applications on their Facebook profiles. In this study, we present the temporal analysis of the Facebook applications' installation and removal dataset collected by our add-on. This dataset consists of information from 2,945 users, collected during a period of over a year. We used linear regression to analyze our dataset and discovered the linear connection between the average percentage change of newly installed Facebook applications and the number of days passed since the user initially installed our add-on. Additionally, we found out that users who used our Firefox add-on become more aware of their security and privacy installing on average fewer new application...

  16. Renewable Energy Assessment Methodology for Japanese OCONUS Army Installations

    SciTech Connect (OSTI)

    Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.; Gorrissen, Willy J.; Kora, Angela R.; Weimar, Mark R.; Hand, James R.; Orrell, Alice C.; Williamson, Jennifer L.

    2010-08-30T23:59:59.000Z

    Since 2005, Pacific Northwest National Laboratory (PNNL) has been asked by Installation Management Command (IMCOM) to conduct strategic assessments at selected US Army installations of the potential use of renewable energy resources, including solar, wind, geothermal, biomass, waste, and ground source heat pumps (GSHPs). IMCOM has the same economic, security, and legal drivers to develop alternative, renewable energy resources overseas as it has for installations located in the US. The approach for continental US (CONUS) studies has been to use known, US-based renewable resource characterizations and information sources coupled with local, site-specific sources and interviews. However, the extent to which this sort of data might be available for outside the continental US (OCONUS) sites was unknown. An assessment at Camp Zama, Japan was completed as a trial to test the applicability of the CONUS methodology at OCONUS installations. It was found that, with some help from Camp Zama personnel in translating and locating a few Japanese sources, there was relatively little difficulty in finding sources that should provide a solid basis for conducting an assessment of comparable depth to those conducted for US installations. Project implementation will likely be more of a challenge, but the feasibility analysis will be able to use the same basic steps, with some adjusted inputs, as PNNL’s established renewable resource assessment methodology.

  17. Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009

    E-Print Network [OSTI]

    Barbose, Galen

    2011-01-01T23:59:59.000Z

    price and cumulative installed capacity data: Yamamoto, M.price and cumulative installed capacity data: Wissing, L.the number of systems and installed capacity by PV incentive

  18. Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008

    E-Print Network [OSTI]

    Barbose, Galen L

    2010-01-01T23:59:59.000Z

    price and cumulative installed capacity data: Yamamoto, M.price and cumulative installed capacity data: Wissing, L.the number of systems and installed capacity by PV incentive

  19. Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007

    E-Print Network [OSTI]

    Wiser, Ryan

    2009-01-01T23:59:59.000Z

    Boston, Massachusetts. Installed capacity totals refer tothe number of systems and installed capacity by PV incentiveFigure 2. In terms of installed capacity, these two states

  20. EXHIBITION INSTALLATION AND DISMANTLING Item Handling and Housing

    E-Print Network [OSTI]

    Mathis, Wayne N.

    EXHIBITION INSTALLATION AND DISMANTLING Item Handling and Housing A. For general handling's and Don'ts. B. For examples of housing options and alternatives for paper artifacts, see Housing and Environment Options for Display, Housing and Environment Options for Storage, or consult a conservator. 1. All

  1. Sun N1 Grid Engine 6.1 Installation Guide

    E-Print Network [OSTI]

    Sun N1 Grid Engine 6.1 Installation Guide Sun Microsystems, Inc. 4150 Network Circle Santa Clara, CA 95054 U.S.A. Part No: 820­0697 May 2007 #12;Copyright 2007 Sun Microsystems, Inc. 4150 Network Circle, Santa Clara, CA 95054 U.S.A. All rights reserved. Sun Microsystems, Inc. has intellectual

  2. Ecological Site Applications on U.S. Military Installations

    E-Print Network [OSTI]

    live ammunition, etc #12;Military Training Impacts #12;Integrated Training Area Management (ITAM a defined land condition baseline for natural and cultural resources that will be maintained through ITAM and is relevant to the installation environmental setting and mission activity. #12;Ecological Sites and ITAM

  3. Decision Support Tool for Desert Tortoises Near Solar Installations

    E-Print Network [OSTI]

    Decision Support Tool for Desert Tortoises Near Solar Installations ENVIRONMENTAL AREA RESEARCH of renewable energy is of vital importance. Through its focus on reducing the environmental impacts of solar PIER Environmental Research www.energy.ca.gov/research/ environmental/index.html April 2011 The Issue

  4. Installing or Upgrading to the SQL Server 2008

    E-Print Network [OSTI]

    Bernstein, Phil

    CHAPTER 1 Installing or Upgrading to the SQL Server 2008 Database Engine SQL Server 2008 Database Engine Services, formerly referred to as "The Database Engine," is the nucleus of SQL Server 2008. Its that command the use of a feature like SQL Server's Database Engine that can process, store, and secure data

  5. Porous Pavements in Cold Climates Part 1: Design, Installation, and

    E-Print Network [OSTI]

    Porous Pavements in Cold Climates Part 1: Design, Installation, and Maintenance A Green Pavements and Infiltration Beds Joshua F. Briggs, Geosyntec, Kristopher Houle, Horsley Witten Group Jeff Manager, CH2M HILL ASCE Committee Report on Recommended Design Guidelines for Permeable Pavements

  6. TI 151A Installation of Controller Module. TABLE OF CONTENTS

    E-Print Network [OSTI]

    Fischer, Emily V.

    containing relays to switch the pumps. · Tool kit with 8" and 10" adjustable crescent wrench, channel lock will be at the sampler installation location, protected by wire nuts. -For an indoors site: a. In the form of a 20 Amp, fuses, relays, and transformers to control sampling initiation. The controller module was designed

  7. Vet’s company installing solar across Massachusetts

    Broader source: Energy.gov [DOE]

    Dan Leary, a U.S. Army veteran, is president of Nexamp Inc., a clean energy company that specializes in solar installation. Dan founded the company in 2006 and has witnessed its impressive growth from six employees to 65 and counting as of July 2010.

  8. T-729: Mozilla Code Installation Through Holding Down Enter

    Broader source: Energy.gov [DOE]

    Attackers can exploit this issue by enticing an unsuspecting victim into viewing and interacting with a malicious Web page. An attacker may be able to exploit this issue to bypass a confirmation dialog and install an arbitrary add-on. This may aid in further attacks.

  9. Sustainability Research & Development Consortium for DoD Installations

    E-Print Network [OSTI]

    Sustainability Research & Development Consortium for DoD Installations Warner College of Natural the growing need for sustainability planning, imple- mentation, and facilitation on United States military bases. CEMML is already a proven global provider of re- search and sustainable management of natural

  10. WARNING: Improper installation, adjustment, alteration, service or maintenance can

    E-Print Network [OSTI]

    Kostic, Milivoje M.

    INSTALLATION AND OPERATING INSTRUCTIONS FOR AUTOMATIC INSTANTANEOUS TYPE WATER HEATERS FOR USE WITH NATURAL(02.01)AL #12;2 This well engineered, gas water heater has all the fea- tures a water heater should have on the water heater, giving you control over your hot water energy use. Each time you turn off your hot water

  11. Systems study of drilling for installation of geothermal heat pumps

    SciTech Connect (OSTI)

    Finger, J.T.; Sullivan, W.N.; Jacobson, R.D.; Pierce, K.G.

    1997-09-01T23:59:59.000Z

    Geothermal, or ground-source, heat pumps (GHP) are much more efficient than air-source units such as conventional air conditioners. A major obstacle to their use is the relatively high initial cost of installing the heat-exchange loops into the ground. In an effort to identify drivers which influence installation cost, a number of site visits were made during 1996 to assess the state-of-the-art in drilling for GHP loop installation. As an aid to quantifying the effect of various drilling-process improvements, we constructed a spread-sheet based on estimated time and material costs for all the activities required in a typical loop-field installation. By substituting different (improved) values into specific activity costs, the effect on total project costs can be easily seen. This report contains brief descriptions of the site visits, key points learned during the visits, copies of the spread-sheet, recommendations for further work, and sample results from sensitivity analysis using the spread-sheet.

  12. THE IMPACT OF CITY-LEVEL PERMITTING PROCESSES ON RESIDENTIAL PV INSTALLATION PRICES AND DEVELOPMENT TIMES

    E-Print Network [OSTI]

    Dong, Changgui

    2014-01-01T23:59:59.000Z

    The installed price of photovoltaic (PV) systems hasprice and development time of residential photovoltaic (PV)

  13. EA-1655: Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition, Installation and Use for Research and Development

    Broader source: Energy.gov [DOE]

    Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition, Installation and Use for Research and Development

  14. Evaluation of Trenchless Installation Technology for Radioactive Wastewater Piping Applications

    SciTech Connect (OSTI)

    Robinson, Sharon M [ORNL; Jubin, Robert Thomas [ORNL; Patton, Bradley D [ORNL; Sullivan, Nicholas M [ORNL; Bugbee, Kathy P [ORNL

    2009-09-01T23:59:59.000Z

    The U.S. Department of Energy (DOE) Office of Environmental Management (EM) cleanup mission at Oak Ridge National Laboratory (ORNL) includes dispositioning facilities, contaminated legacy materials/waste, and contamination sources and remediation of soil under facilities, groundwater, and surface water to support final Records of Decision (RODs). The Integrated Facilities Disposition Project (IFDP) is a roughly $15B project for completion of the EM mission at Oak Ridge, with a project duration of up to 35 years. The IFDP Mission Need Statement - Critical Decision-0 (CD-0) - was approved by DOE in July 2007, and the IFDP Alternative Selection and Cost Range - Critical Decision-1 (CD-1) - was approved in November 2008. The IFDP scope includes reconfiguration of waste collection and treatment systems as needed to complete the IFDP remediation and decontamination and decommissioning (D&D) missions in a safe and cost-effective manner while maintaining compliance with all governing regulations and bodies and preserving the support of continuing operations at ORNL. A step in the CD-1 approval process included an external technical review (ETR) of technical approaches proposed in the CD-1 document related to the facility reconfiguration for the ORNL radioactive waste and liquid low-level waste management systems. The ETR team recommended that the IFDP team consider the use of trenchless technologies for installing pipelines underground in and around contaminated sites as part of the alternatives evaluations required in support of the CD-2 process. The team specifically recommended evaluating trenchless technologies for installing new pipes in existing underground pipelines as an alternative to conventional open trench installation methods. Potential benefits could include reduction in project costs, less costly underground piping, fewer disruptions of ongoing and surface activities, and lower risk for workers. While trenchless technologies have been used extensively in the sanitary sewer and natural gas pipeline industries, they have been used far less in contaminated environments. Although trenchless technologies have been used at ORNL in limited applications to install new potable water and gas lines, the technologies have not been used in radioactive applications. This study evaluates the technical risks, benefits, and economics for installing gravity drained and pressurized piping using trenchless technologies compared to conventional installation methods for radioactive applications under ORNL geological conditions. A range of trenchless installation technologies was reviewed for this report for general applicability for replacing existing contaminated piping and/or installing new pipelines in potentially contaminated areas. Installation methods that were determined to have potential for use in typical ORNL contaminated environments were then evaluated in more detail for three specific ORNL applications. Each feasible alternative was evaluated against the baseline conventional open trench installation method using weighted criteria in the areas of environment, safety, and health (ES&H); project cost and schedule; and technical operability. The formulation of alternatives for evaluation, the development of selection criteria, and the scoring of alternatives were performed by ORNL staff with input from vendors and consultants. A description of the evaluation methodology and the evaluation results are documented in the following sections of this report.

  15. SunShot Prize: America's Most Affordable Rooftop Solar: A Competition To Spur Low-Cost Rooftop Solar Installations Across The Nation (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2012-06-01T23:59:59.000Z

    The SunShot Prize encourages novel public-private partnerships, original business models, and innovative approaches to installing clean, renewable solar energy. The sustainable business strategies developed by participants will provide transferable lessons that can be applied nationwide to hasten America's transition to affordable clean energy in a post-subsidy market.

  16. Impact of Installation Faults on Heat Pump Performance

    SciTech Connect (OSTI)

    Hourahan, Mr. Glenn [Air Conditioning Contractors of America, Arlington, VA; Baxter, Van D [ORNL

    2015-01-01T23:59:59.000Z

    Numerous studies and surveys indicate that typically-installed HVAC equipment operate inefficiently and waste considerable energy due to varied installation errors (faults) such as improper refrigerant charge, incorrect airflow, oversized equipment, and leaky ducts. This article summarizes the results of a large United States (U.S.) experimental/analytical study (U.S. contribution to IEA HPP Annex 36) of the impact that different faults have on the performance of an air-source heat pump (ASHP) in a typical U.S. single-family house. It combines building effects, equipment effects, and climate effects in an evaluation of the faults impact on seasonal energy consumption through simulations of the house/ASHP pump system.

  17. Idaho National Engineering Laboratory installation roadmap document. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1993-05-30T23:59:59.000Z

    The roadmapping process was initiated by the US Department of Energy`s office of Environmental Restoration and Waste Management (EM) to improve its Five-Year Plan and budget allocation process. Roadmap documents will provide the technical baseline for this planning process and help EM develop more effective strategies and program plans for achieving its long-term goals. This document is a composite of roadmap assumptions and issues developed for the Idaho National Engineering Laboratory (INEL) by US Department of Energy Idaho Field Office and subcontractor personnel. The installation roadmap discusses activities, issues, and installation commitments that affect waste management and environmental restoration activities at the INEL. The High-Level Waste, Land Disposal Restriction, and Environmental Restoration Roadmaps are also included.

  18. Technical oversight for installation of TNX piezometers, Final Report

    SciTech Connect (OSTI)

    Pidcoe, W.W. Jr. [Westinghouse Savannah River Company, Aiken, SC (United States)

    1997-06-05T23:59:59.000Z

    Science Applications International Corporation was tasked under subcontract C002025P to provide technical oversight for the drilling of one pilot borehole, and the drilling and installation of five piezometers in the TNX Area Swamp. The work was performed in accordance with the Statement of Work in Task Order Proposal No. ER39-129 dated August 6, 1996. This report describes the activities associated with the performance of the task.

  19. New BPM installed in BC2 Jan Hauschildt

    E-Print Network [OSTI]

    New BPM installed in BC2 Compact! Thanks to: Jan Hauschildt Dirk Noelle Silke Vilcins Holger 30 40 time (ns) Volts chicane BPM scope traces for 12-16 MV/m gradient Scope in tunnel ~ 150 um resolution => 5*10-4 resolution #12;-20 -15 -10 -5 0 0.9 1 1.1 1.2 1.3 1.4 1.5 BPM slope phase (deg

  20. Open PV Project: Unlocking PV Installation Data (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2012-04-01T23:59:59.000Z

    This brochure summarizes the Open PV Project, a collaborative effort of government, industry, and the public to compile a comprehensive database of PV installations in the United States. The brochure outlines the purpose and history of the project as well as the main capabilities and benefits of the online Open PV tool. The brochure also introduces how features of the tool are used, and it describes the sources and characteristics of Open PV's data and data collection processes.

  1. Solar space and water heating system installed at Charlottesville, Virginia

    SciTech Connect (OSTI)

    Greer, Charles R.

    1980-09-01T23:59:59.000Z

    The solar energy system located at David C. Wilson Neuropsychiatric Hospital, Charlottesville, Virginia, consists of 88 single glazed, Sunworks Solector copper base plate collector modules; hot water coils in the hot air ducts; a domestic hot water (DHW) preheat tank; a 3,000 gallon concrete urethane-insulated storage tank and other miscellaneous components. This report includes extracts from the site files, specifications, drawings, installation, operation and maintenance instructions.

  2. CSP'960H/CSP-960S Installation Guide

    E-Print Network [OSTI]

    Kleinfeld, David

    CSP'960H/CSP-960S Installation Guide 4-634-979-01 TM Read First! 1^00 - 3lG - 755; #12;CSP-960H/CSP CSP-960H only) J Sony CDU926S CD-R Drive Unit User's Guide Use this manual as a guide to help you. If all the items are not found, please contact your Sony dealer before proceeding. G CSP-960H/960S CD

  3. Installation-wide energy-conservation demonstration at Fort McClellan, Alabama. Final report

    SciTech Connect (OSTI)

    Windingland, L.M.; Lilly, B.P.; Shonder, J.A.; Underwood, D.M.; Augustine, L.J.

    1988-11-01T23:59:59.000Z

    The objective of the installation-wide energy conservation demonstration at Fort McClellan, AL, was to evaluate the effectiveness of applying available energy-conservation technologies and techniques to produce significant and predictable reductions in energy use and cost. Five major areas of energy conservation were identified and investigated: (1) pressure reduction in district-steam-heating systems; (2) reduction of outdoor air in heating, ventilation, and air-conditioning (HVAC) systems; (3) replacement of oversized and inefficient motors in HVAC systems; (4) reduction of outdoor air infiltration in family housing; and (5) combustion optimization of gas-fired heating equipment. Other areas of investigation included radio-controlled exterior lighting, and temperature reduction in the high-temperature hot-water system. Each conservation project was evaluated on a small scale to verify energy savings before it was implemented. An energy-information management system was developed to maintain annual consumption data for each building. The system provides immediate feedback on energy use so managers can make correct decisions on conservation measures. The energy conservation programs implemented at Fort McClellan contributed to the 14% reduction in baseline (weather independent) energy consumption from FY84 to FY86. These programs have wide applicability to other U.S. Army installations. This research has also shown the importance of preliminary, small-scale testing of energy-conservation programs before implementation.

  4. Design and installation manual for thermal energy storage

    SciTech Connect (OSTI)

    Cole, R L; Nield, K J; Rohde, R R; Wolosewicz, R M

    1980-01-01T23:59:59.000Z

    The purpose of this manual is to provide information on the design and installation of thermal energy storage in active solar systems. It is intended for contractors, installers, solar system designers, engineers, architects, and manufacturers who intend to enter the solar energy business. The reader should have general knowledge of how solar heating and cooling systems operate and knowledge of construction methods and building codes. Knowledge of solar analysis methods such as f-Chart, SOLCOST, DOE-1, or TRNSYS would be helpful. The information contained in the manual includes sizing storage, choosing a location for the storage device, and insulation requirements. Both air-based and liquid-based systems are covered with topics on designing rock beds, tank types, pump and fan selection, installation, costs, and operation and maintenance. Topics relevant to latent heat storage include properties of phase-change materials, sizing the storage unit, insulating the storage unit, available systems, and cost. Topics relevant to heating domestic water include safety, single- and dual-tank systems, domestic water heating with air- and liquid-based space heating systems, and stand alone domestics hot water systems. Several appendices present common problems with storage systems and their solutions, heat transfer fluid properties, economic insulation thickness, heat exchanger sizing, and sample specifications for heat exchangers, wooden rock bins, steel tanks, concrete tanks, and fiberglass-reinforced plastic tanks.

  5. Empirically Derived Strength of Residential Roof Structures for Solar Installations.

    SciTech Connect (OSTI)

    Dwyer, Stephen F.; Sanchez, Alfred; Campos, Ivan A.; Gerstle, Walter H.

    2014-12-01T23:59:59.000Z

    Engineering certification for the installation of solar photovoltaic (PV) modules on wood roofs is often denied because existing wood roofs do not meet structural design codes. This work is intended to show that many roofs are actually sufficiently strong given the conservatism in codes, documented allowable strengths, roof structure system effects, and beam composite action produced by joist-sheathing interaction. This report provides results from a testing program to provide actual load carrying capacity of residential rooftops. The results reveal that the actual load carrying capacity of structural members and systems tested are significantly stronger than allowable loads provided by the International Residential Code (IRC 2009) and the national structural code found in Minimum Design Loads for Buildings and Other Structures (ASCE 7-10). Engineering analysis of residential rooftops typically ignores the system affects and beam composite action in determining rooftop stresses given a potential PV installation. This extreme conservatism combined with conservatism in codes and published allowable stress values for roof building materials (NDS 2012) lead to the perception that well built homes may not have adequate load bearing capacity to enable a rooftop PV installation. However, based on the test results presented in this report of residential rooftop structural systems, the actual load bearing capacity is several times higher than published values (NDS 2012).

  6. Environmental assessment: Kotzebue Wind Installation Project, Kotzebue, Alaska

    SciTech Connect (OSTI)

    NONE

    1998-05-01T23:59:59.000Z

    The DOE is proposing to provide financial assistance to the Kotzebue Electric Association to expand its existing wind installation near Kotzebue, Alaska. Like many rural Alaska towns, Kotzebue uses diesel-powered generators to produce its electricity, the high cost of which is currently subsidized by the Alaska State government. In an effort to provide a cost effective and clean source of electricity, reduce dependence on diesel fuel, and reduce air pollutants, the DOE is proposing to fund an experimental wind installation to test commercially available wind turbines under Arctic conditions. The results would provide valuable information to other Alaska communities experiencing similar dependence on diesel-powered generators. The environmental assessment for the proposed wind installation assessed impacts to biological resources, land use, electromagnetic interference, coastal zone, air quality, cultural resources, and noise. It was determined that the project does not constitute a major Federal action significantly affecting the quality of the human environment. Therefore, the preparation of an environmental impact statement is not required, and DOE has issued a Finding of No Significant Impact.

  7. HOUSING GUARANTEE Apply Online

    E-Print Network [OSTI]

    Mease, Kenneth D.

    THE UCI HOUSING GUARANTEE Apply Online 1 Log in to your MyAdmission account via the tab of Admission fee. 3 Complete the Online Housing Application and pay the $20 non-refundable fee. Freshmen apply for the residence halls. Transfer students apply for Arroyo Vista theme houses and on-campus apartments. Students 25

  8. Automated solar collector installation design including ability to define heterogeneous design preferences

    DOE Patents [OSTI]

    Wayne, Gary; Frumkin, Alexander; Zaydman, Michael; Lehman, Scott; Brenner, Jules

    2013-01-08T23:59:59.000Z

    Embodiments may include systems and methods to create and edit a representation of a worksite, to create various data objects, to classify such objects as various types of pre-defined "features" with attendant properties and layout constraints. As part of or in addition to classification, an embodiment may include systems and methods to create, associate, and edit intrinsic and extrinsic properties to these objects. A design engine may apply of design rules to the features described above to generate one or more solar collectors installation design alternatives, including generation of on-screen and/or paper representations of the physical layout or arrangement of the one or more design alternatives. Embodiments may also include definition of one or more design apertures, each of which may correspond to boundaries in which solar collector layouts should comply with distinct sets of user-defined design preferences. Distinct apertures may provide heterogeneous regions of collector layout according to the user-defined design preferences.

  9. Automated solar collector installation design including ability to define heterogeneous design preferences

    DOE Patents [OSTI]

    Wayne, Gary; Frumkin, Alexander; Zaydman, Michael; Lehman, Scott; Brenner, Jules

    2014-04-29T23:59:59.000Z

    Embodiments may include systems and methods to create and edit a representation of a worksite, to create various data objects, to classify such objects as various types of pre -defined "features" with attendant properties and layout constraints. As part of or in addition to classification, an embodiment may include systems and methods to create, associate, and edit intrinsic and extrinsic properties to these objects. A design engine may apply of design rules to the features described above to generate one or more solar collectors installation design alternatives, including generation of on-screen and/or paper representations of the physical layout or arrangement of the one or more design alternatives. Embodiments may also include definition of one or more design apertures, each of which may correspond to boundaries in which solar collector layouts should comply with distinct sets of user-defined design preferences. Distinct apertures may provide heterogeneous regions of collector layout according to the user-defined design preferences.

  10. HighCharts Non-commercial installation and activation help needed...

    Open Energy Info (EERE)

    Hi, I have installed Databus. After a fewdays the dashboard went blank with the message to get a license for Highcharts. How do I install the latest Non-commercial version...

  11. Installing OMERO.searcher Local Client version 1.3 in MacOSX

    E-Print Network [OSTI]

    Murphy, Robert F.

    the license 5. Install Enthought. It is Python distribution with a GUI, integrated code editor and IPython #12;console that comes with numpy+scipy+matplotlib+PIL+ipython. Before installing the software we need to make

  12. So You Want to Go Solar? 3 Things to Consider When Installing...

    Office of Environmental Management (EM)

    So You Want to Go Solar? 3 Things to Consider When Installing Solar Power at Home So You Want to Go Solar? 3 Things to Consider When Installing Solar Power at Home October 3, 2014...

  13. Volume XVI, No. 1 A publication of the U.S. Army Installation Management Agency

    E-Print Network [OSTI]

    US Army Corps of Engineers

    . January/February 2004 Vol. XVI, No. 1 Printed on recycled paper. U.S. Army Installation Management Agency of installation services through Common Levels of Support by Karan Foutch 12 Don't be caught by the tire TRAP

  14. First U.S. Grid-Connected Offshore Wind Turbine Installed Off...

    Office of Environmental Management (EM)

    First U.S. Grid-Connected Offshore Wind Turbine Installed Off the Coast of Maine First U.S. Grid-Connected Offshore Wind Turbine Installed Off the Coast of Maine October 1, 2013 -...

  15. Oil/gas separator for installation at burning wells

    DOE Patents [OSTI]

    Alonso, Carol T. (Orinda, CA); Bender, Donald A. (Dublin, CA); Bowman, Barry R. (Livermore, CA); Burnham, Alan K. (Livermore, CA); Chesnut, Dwayne A. (Pleasanton, CA); Comfort, III, William J. (Livermore, CA); Guymon, Lloyd G. (Livermore, CA); Henning, Carl D. (Livermore, CA); Pedersen, Knud B. (Livermore, CA); Sefcik, Joseph A. (Tracy, CA); Smith, Joseph A. (Livermore, CA); Strauch, Mark S. (Livermore, CA)

    1993-01-01T23:59:59.000Z

    An oil/gas separator is disclosed that can be utilized to return the burning wells in Kuwait to production. Advantageously, a crane is used to install the separator at a safe distance from the well. The gas from the well is burned off at the site, and the oil is immediately pumped into Kuwait's oil gathering system. Diverters inside the separator prevent the oil jet coming out of the well from reaching the top vents where the gas is burned. The oil falls back down, and is pumped from an annular oil catcher at the bottom of the separator, or from the concrete cellar surrounding the well.

  16. Oil/gas separator for installation at burning wells

    DOE Patents [OSTI]

    Alonso, C.T.; Bender, D.A.; Bowman, B.R.; Burnham, A.K.; Chesnut, D.A.; Comfort, W.J. III; Guymon, L.G.; Henning, C.D.; Pedersen, K.B.; Sefcik, J.A.; Smith, J.A.; Strauch, M.S.

    1993-03-09T23:59:59.000Z

    An oil/gas separator is disclosed that can be utilized to return the burning wells in Kuwait to production. Advantageously, a crane is used to install the separator at a safe distance from the well. The gas from the well is burned off at the site, and the oil is immediately pumped into Kuwait's oil gathering system. Diverters inside the separator prevent the oil jet coming out of the well from reaching the top vents where the gas is burned. The oil falls back down, and is pumped from an annular oil catcher at the bottom of the separator, or from the concrete cellar surrounding the well.

  17. Spurring Solar Installations in Hawaii | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently AskedEnergyIssues DOE's NuclearSpurring Solar Installations in Hawaii Spurring

  18. Factors Affecting PMU Installation Costs (October 2014) | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport in RepresentativeDepartmentEnergy Factors Affecting PMU Installation Costs

  19. Workplace Charging Challenge: Install and Manage PEV Charging at Work |

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China 2015ofDepartment of EnergyThePatricia HoffmanDepartment of Energy Install

  20. Installed Geothermal Capacity/Data | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetecGtel JumpCounty,Jump7OpenInnovative SolutionsInsource Energy JumpInstalled

  1. NM Installation Requirements for UST Systems | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall, Pennsylvania: Energy Resources JumpNEF Advisors LLC JumpNF EnergyInstallation

  2. Property:Project Installed Capacity (MW) | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I GeothermalPotentialBiopowerSolidGenerationMethod Jump to: navigation, search Property NameInstalled Capacity

  3. NREL Job Task Analysis: Retrofit Installer Technician | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOrigin of Contamination in Many Devils Wash,Energy NREL Job Task Analysis: Retrofit Installer

  4. Installing and Operating an Efficient Swimming Pool Pump | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport(FactDepartment of Energy InvestingS10IS007 InspectionRemovableInstalling

  5. Applied Computer Science

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Science and Innovation Computing CCS Division CCS-7 Applied Computer Science Innovative co-design of applications, algorithms, and architectures in order to enable...

  6. Apply early! Limited enrollment.

    E-Print Network [OSTI]

    volcano. Experience the culture and history of Hawaii, and the impact of human activitiesApply early! Limited enrollment. Environmental Science in the Hawaiian Islands Observe, research

  7. Selecting and Applying Interfacings

    E-Print Network [OSTI]

    2006-05-01T23:59:59.000Z

    Selecting and using interfacing correctly is an important component of garment construction. The various types of interfacing are described and methods of applying them are discussed in detail....

  8. (c) 2001, Laszlo Gulyas, Harvard University Installing a development environment for Java

    E-Print Network [OSTI]

    Tesfatsion, Leigh

    (for installation) ·High resolution graphic adapter and monitor (1024x768 or higher, 256 colors) ·Mouse through the following two main steps: 1.Installing the JavaTM 2 SDK, Standard Edition, v 1.4.0 (or later these steps, one after another. Installing the JavaTM 2 SDK, Standard Edition, v 1.4.1 This section describes

  9. Environmental impacts of large-scale grid-connected ground-mounted PV installations

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Environmental impacts of large-scale grid-connected ground-mounted PV installations Antoine Beylota-scale ground-mounted PV installations by considering a life-cycle approach. The methodology is based. Mobile PV installations with dual-axis trackers show the largest impact potential on ecosystem quality

  10. Tracking Progress Last updated 10/7/2013 Installed Capacity 1

    E-Print Network [OSTI]

    Tracking Progress Last updated 10/7/2013 Installed Capacity 1 Installed Capacity The capacities 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Capacity (MW) Wind Solar Small Hydro Large Hydro Reporting #12;Tracking Progress Last updated 10/7/2013 Installed Capacity 2 Table 1 provides the data

  11. STATE OF CALIFORNIA HSPP/PSPP INSTALLATION; COOLING COIL AIRFLOW & FAN WATT DRAW TEST

    E-Print Network [OSTI]

    STATE OF CALIFORNIA HSPP/PSPP INSTALLATION; COOLING COIL AIRFLOW & FAN WATT DRAW TEST CEC- CF-4R TESTING CF-4R-MECH-22 HSPP/PSPP Installation; Cooling Coil Airflow & Fan Watt Draw Test (Page 1 of 3) Site of a Static Pressure Probe (HSPP), and Permanently installed Static Pressure Probe (PSPP) in the supply plenum

  12. STATE OF CALIFORNIA HSPP/PSPP INSTALLATION; COOLING COIL AIRFLOW & FAN WATT DRAW TEST

    E-Print Network [OSTI]

    STATE OF CALIFORNIA HSPP/PSPP INSTALLATION; COOLING COIL AIRFLOW & FAN WATT DRAW TEST CEC-CF-6R/PSPP Installation; Cooling Coil Airflow & Fan Watt Draw Test (Page 1 of 3) Site Address: Enforcement Agency: Permit), and Permanently installed Static Pressure Probe (PSPP) in the supply plenum When the Certificate of Compliance (CF

  13. Solar Power Systems Find A Professional Solar Energy Installer For Any

    E-Print Network [OSTI]

    Lovley, Derek

    Solar Power Systems Find A Professional Solar Energy Installer For Any Type Of System www.CleanEnergyAuthority.com Install Solar Panels Enter Your Zip Code & Connect To Pre-Screened Solar Panel Installers www.ServiceMagic.com Biomass Pumps Reliable metering for apps from microflow to scale-up & pilot plant www.isco.com The Solar

  14. PIBASE.ligands installation guide. ver 200905 Fred P. Davis, HHMI-JFRC

    E-Print Network [OSTI]

    Eddy, Sean

    SQL interface, a software package is also available that enables a web interface to the database. The database Web interface To install the web interface to the PIBASE.ligands database, you must first have a working PIBASE web server installed. Once you have the PIBASE web interface installed, download the PIBASE

  15. INTRODUCTION APPLIED GEOPHYSICS

    E-Print Network [OSTI]

    Merriam, James

    GEOL 384.3 INTRODUCTION TO APPLIED GEOPHYSICS OUTLINE INTRODUCTION TO APPLIED GEOPHYSICS GEOL 384 unknowns; the ones we don't know we don't know. And if one looks throughout the history of geophysics he didn't really say geophysics. He said, " ... our country and other free countries ...". But I am

  16. IGSHPA Continuing Education Credit Form Accreditation for IGSHPA accredited installers is valid for three years. During those three years an installer must accumulate eight

    E-Print Network [OSTI]

    for three years. During those three years an installer must accumulate eight points to renew the accreditation. The points can be accumulated in three ways - through employment, membership in an approved The installer may accumulate 4 points by remaining continually employed for three years in the combined

  17. Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007

    E-Print Network [OSTI]

    Wiser, Ryan

    2009-01-01T23:59:59.000Z

    The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-

  18. Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008

    E-Print Network [OSTI]

    Barbose, Galen L

    2010-01-01T23:59:59.000Z

    The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-

  19. Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009

    E-Print Network [OSTI]

    Barbose, Galen

    2011-01-01T23:59:59.000Z

    The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-

  20. Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009

    E-Print Network [OSTI]

    Barbose, Galen

    2011-01-01T23:59:59.000Z

    from 1998-2009 Tracking the Sun III: The Installed Cost ofSystems MW Total Tracking the Sun III: The Installed Cost ofthrough 2009. Tracking the Sun III: The Installed Cost of

  1. Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008

    E-Print Network [OSTI]

    Barbose, Galen L

    2010-01-01T23:59:59.000Z

    Systems MW Total Tracking the Sun II: The Installed Cost of PhotovoltaicsSystems Tracking the Sun II: The Installed Cost of PhotovoltaicsSystem Size Tracking the Sun II: The Installed Cost of Photovoltaics

  2. Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007

    E-Print Network [OSTI]

    Wiser, Ryan

    2009-01-01T23:59:59.000Z

    systems Tracking the Sun: The Installed Cost of PhotovoltaicsSystem Size Tracking the Sun: The Installed Cost of Photovoltaicssystem size, for PV Tracking the Sun: The Installed Cost of Photovoltaics

  3. Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009

    E-Print Network [OSTI]

    Barbose, Galen

    2011-01-01T23:59:59.000Z

    Systems MW Total Tracking the Sun III: The Installed Cost of PhotovoltaicsSystem Size Tracking the Sun III: The Installed Cost of PhotovoltaicsSystems >10 kW Tracking the Sun III: The Installed Cost of Photovoltaics

  4. Installation of Window Air Conditioners Page 1 of 2 Virginia Polytechnic Institute and State University No. 5705 Rev.: 3

    E-Print Network [OSTI]

    Buehrer, R. Michael

    Installation of Window Air Conditioners Page 1 of 2 Virginia Polytechnic Institute and State __________________________________________________________________________________ Subject: Installation of Window Air Conditioners........................................................................................................................................1 1. Purpose To define a policy for installation of window air conditioners that avoids exterior

  5. Monte Carlo Simulation Tool Installation and Operation Guide

    SciTech Connect (OSTI)

    Aguayo Navarrete, Estanislao; Ankney, Austin S.; Berguson, Timothy J.; Kouzes, Richard T.; Orrell, John L.; Troy, Meredith D.; Wiseman, Clinton G.

    2013-09-02T23:59:59.000Z

    This document provides information on software and procedures for Monte Carlo simulations based on the Geant4 toolkit, the ROOT data analysis software and the CRY cosmic ray library. These tools have been chosen for its application to shield design and activation studies as part of the simulation task for the Majorana Collaboration. This document includes instructions for installation, operation and modification of the simulation code in a high cyber-security computing environment, such as the Pacific Northwest National Laboratory network. It is intended as a living document, and will be periodically updated. It is a starting point for information collection by an experimenter, and is not the definitive source. Users should consult with one of the authors for guidance on how to find the most current information for their needs.

  6. Solar space heating installed at Kansas City, Kansas. Final report

    SciTech Connect (OSTI)

    Not Available

    1981-05-01T23:59:59.000Z

    The solar energy system was constructed with the new 48,800 square feet warehouse to heat the warehouse area of about 39,000 square feet while the auxiliary energy system heats the office area of about 9800 square feet. The building is divided into 20 equal units, and each has its own solar system. The modular design permits the flexibility of combining multiple units to form offices or warehouses of various size floor areas as required by a tenant. Each unit has 20 collectors which are mounted in a single row. The collectors, manufactured by Solaron Corporation, are double glazed flat plate collectors with a gross area of 7800 ft/sup 2/. Air is heated either through the collectors or by the electric resistance duct coils. No freeze protection or storage is required for this system. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are included.

  7. Gas turbine nozzle vane insert and methods of installation

    DOE Patents [OSTI]

    Miller, William John (Simpsonville, SC); Predmore, Daniel Ross (Clifton Park, NY); Placko, James Michael (West Chester, OH)

    2002-01-01T23:59:59.000Z

    A pair of hollow elongated insert bodies are disposed in one or more of the nozzle vane cavities of a nozzle stage of a gas turbine. Each insert body has an outer wall portion with apertures for impingement-cooling of nozzle wall portions in registration with the outer wall portion. The insert bodies are installed into the cavity separately and spreaders flex the bodies toward and to engage standoffs against wall portions of the nozzle whereby the designed impingement gap between the outer wall portions of the insert bodies and the nozzle wall portions is achieved. The spreaders are secured to the inner wall portions of the insert bodies and the bodies are secured to one another and to the nozzle vane by welding or brazing.

  8. Information handbook on independent spent fuel storage installations

    SciTech Connect (OSTI)

    Raddatz, M.G.; Waters, M.D.

    1996-12-01T23:59:59.000Z

    In this information handbook, the staff of the U.S. Nuclear Regulatory Commission describes (1) background information regarding the licensing and history of independent spent fuel storage installations (ISFSIs), (2) a discussion of the licensing process, (3) a description of all currently approved or certified models of dry cask storage systems (DCSSs), and (4) a description of sites currently storing spent fuel in an ISFSI. Storage of spent fuel at ISFSIs must be in accordance with the provisions of 10 CFR Part 72. The staff has provided this handbook for information purposes only. The accuracy of any information herein is not guaranteed. For verification or for more details, the reader should refer to the respective docket files for each DCSS and ISFSI site. The information in this handbook is current as of September 1, 1996.

  9. Installation of geosynthetic clay liners at California MSW landfills

    SciTech Connect (OSTI)

    Snow, M.; Jesionek, K.S.; Dunn, R.J.; Kavazanjian, E. Jr.

    1997-11-01T23:59:59.000Z

    The California regulations for liner systems at municipal solid waste (MSW) landfills require that alternatives to the prescriptive federal Subtitle D liner system have a containment capability greater than that of the prescriptive system. Regulators may also require a demonstration that use of the prescriptive system is burdensome prior to approval of an alternative liner design. This paper presents seven case histories of the design and installation of geosynthetic clay liners (GCL) as an alternative to the low-permeability soil component of the prescriptive Subtitle D composite liner system at MSW landfills in California. These case histories cover GCLs from different manufacturers and landfill sites with a wide range of conditions including canyon landfills with slopes as steep as 1H:1V.

  10. Safety of Hydrogen Systems Installed in Outdoor Enclosures

    SciTech Connect (OSTI)

    Barilo, Nick F.

    2013-11-06T23:59:59.000Z

    The Hydrogen Safety Panel brings a broad cross-section of expertise from the industrial, government, and academic sectors to help advise the U.S. Department of Energy’s (DOE) Fuel Cell Technologies Office through its work in hydrogen safety, codes, and standards. The Panel’s initiatives in reviewing safety plans, conducting safety evaluations, identifying safety-related technical data gaps, and supporting safety knowledge tools and databases cover the gamut from research and development to demonstration and deployment. The Panel’s recent work has focused on the safe deployment of hydrogen and fuel cell systems in support of DOE efforts to accelerate fuel cell commercialization in early market applications: vehicle refueling, material handling equipment, backup power for warehouses and telecommunication sites, and portable power devices. This paper resulted from observations and considerations stemming from the Panel’s work on early market applications. This paper focuses on hydrogen system components that are installed in outdoor enclosures. These enclosures might alternatively be called “cabinets,” but for simplicity, they are all referred to as “enclosures” in this paper. These enclosures can provide a space where a flammable mixture of hydrogen and air might accumulate, creating the potential for a fire or explosion should an ignition occur. If the enclosure is large enough for a person to enter, and ventilation is inadequate, the hydrogen concentration could be high enough to asphyxiate a person who entered the space. Manufacturers, users, and government authorities rely on requirements described in codes to guide safe design and installation of such systems. Except for small enclosures used for hydrogen gas cylinders (gas cabinets), fuel cell power systems, and the enclosures that most people would describe as buildings, there are no hydrogen safety requirements for these enclosures, leaving gaps that must be addressed. This paper proposes that a technical basis be developed to enable code bodies to write requirements for the range of enclosures from the smallest to the largest.

  11. Experimental Evaluation of Installed Cooking Exhaust Fan Performance

    SciTech Connect (OSTI)

    Singer, Brett C.; Delp, William W.; Apte, Michael G.

    2010-11-01T23:59:59.000Z

    The installed performance of cooking exhaust fans was evaluated through residential field experiments conducted on a sample of 15 devices varying in design and other characteristics. The sample included two rear downdraft systems, two under-cabinet microwave over range (MOR) units, three different installations of an under-cabinet model with grease screens across the bottom and no capture hood, two devices with grease screens covering the bottom of a large capture hood (one under-cabinet, one wall-mount chimney), four under-cabinet open hoods, and two open hoods with chimney mounts over islands. Performance assessment included measurement of airflow and sound levels across fan settings and experiments to quantify the contemporaneous capture efficiency for the exhaust generated by natural gas cooking burners.Capture efficiency is defined as the fraction of generated pollutants that are removed through the exhaust and thus not available for inhalation of household occupants. Capture efficiency (CE) was assessed for various configurations of burner use (e.g., single front, single back, combination of one front and one back, oven) and fan speed setting. Measured airflow rates were substantially lower than the levels noted in product literature for many of the units. This shortfall was observed for several units costing in excess of $1000. Capture efficiency varied widely (from<5percent to roughly 100percent) across devices and across conditions for some devices. As expected, higher capture efficiencies were achieved with higher fan settings and the associated higher air flow rates. In most cases, capture efficiencies were substantially higher for rear burners than for front burners. The best and most consistent performance was observed for open hoods that covered all cooktop burners and operated at higher airflow rates. The lowest capture efficiencies were measured when a front burner was used with a rear backdraft system or with lowest fan setting for above the range systems that do not cover the front burners.

  12. Essays in applied microeconomics

    E-Print Network [OSTI]

    Aron-Dine, Aviva

    2012-01-01T23:59:59.000Z

    This dissertation consists of three chapters on topics in applied microeconomics. In the first chapter. I investigate whether voters are more likely to support additional spending on local public services when they perceive ...

  13. Engineering and Applied

    E-Print Network [OSTI]

    Stowell, Michael

    > Computer Science > Electrical, Computer, and Energy Engineering > Mechanical Engineering 11, Computational Science and Engineering, Energy Systems and Environmental Sustainability, Materials ScienceCollege of Engineering and Applied Science Contact Robert H. Davis, Engineering Dean 303

  14. Applying for Research Awards

    E-Print Network [OSTI]

    ... 53.22 KB APPLYING FOR RESEARCH AWARDS The Eastern Bird Banding Association seeks applicants for its annual $500 research awards in aid of research using banding techniques or bird banding data. ...

  15. Information Science, Computing, Applied Math

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Science, Computing, Applied Math science-innovationassetsimagesicon-science.jpg Information Science, Computing, Applied Math National security depends on science and...

  16. Expert Meeting Report: Achieving the Best Installed Performance from High-Efficiency Residential Gas Furnaces

    SciTech Connect (OSTI)

    Brand, L.

    2012-03-01T23:59:59.000Z

    This report describes a Building America expert meeting hosted on July 28, 2011, by the Partnership for Advanced Residential Retrofit team. The purpose of this meeting was to identify installation practices that provide the best installed efficiency for residential gas furnaces, explain how AFUE and field efficiency can differ, and investigate the impact of installation practices on the efficiency and long-term durability of the furnace.

  17. Integrated dynamic landscape analysis and modeling system (IDLAMS) : installation manual.

    SciTech Connect (OSTI)

    Li, Z.; Majerus, K. A.; Sundell, R. C.; Sydelko, P. J.; Vogt, M. C.

    1999-02-24T23:59:59.000Z

    The Integrated Dynamic Landscape Analysis and Modeling System (IDLAMS) is a prototype, integrated land management technology developed through a joint effort between Argonne National Laboratory (ANL) and the US Army Corps of Engineers Construction Engineering Research Laboratories (USACERL). Dr. Ronald C. Sundell, Ms. Pamela J. Sydelko, and Ms. Kimberly A. Majerus were the principal investigators (PIs) for this project. Dr. Zhian Li was the primary software developer. Dr. Jeffrey M. Keisler, Mr. Christopher M. Klaus, and Mr. Michael C. Vogt developed the decision analysis component of this project. It was developed with funding support from the Strategic Environmental Research and Development Program (SERDP), a land/environmental stewardship research program with participation from the US Department of Defense (DoD), the US Department of Energy (DOE), and the US Environmental Protection Agency (EPA). IDLAMS predicts land conditions (e.g., vegetation, wildlife habitats, and erosion status) by simulating changes in military land ecosystems for given training intensities and land management practices. It can be used by military land managers to help predict the future ecological condition for a given land use based on land management scenarios of various levels of training intensity. It also can be used as a tool to help land managers compare different land management practices and further determine a set of land management activities and prescriptions that best suit the needs of a specific military installation.

  18. SUSTAINABILITY WHO CAN APPLY

    E-Print Network [OSTI]

    FUNDED BY CALL FOR SUSTAINABILITY RESEARCH STUDENT WHO CAN APPLY Undergraduate and graduate Participate in the Global Change & Sustainability Center's Research Symposium; attend workshops with faculty or publish in the U's student-run sustainability publication to be released in May 2014. Are you conducting

  19. Applied Microbiology and Biotechnology

    E-Print Network [OSTI]

    Alvarez-Cohen, Lisa

    1 23 Applied Microbiology and Biotechnology ISSN 0175-7598 Appl Microbiol Biotechnol DOI 10.1007/s-Cohen #12;1 23 Your article is protected by copyright and all rights are held exclusively by Springer in electronic repositories. If you wish to self-archive your article, please use the accepted manuscript version

  20. Consider Installing Turbulators on Two- and Three-Pass Firetube Boilers

    SciTech Connect (OSTI)

    Not Available

    2006-01-01T23:59:59.000Z

    This revised ITP tip sheet on installing turbulators on firetube boilers provides how-to advice for improving the system using low-cost, proven practices and technologies.

  1. Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006

    E-Print Network [OSTI]

    2008-01-01T23:59:59.000Z

    to Drive Wind Development. . . . . . . . . . . . . . .5 GE Wind Is the Dominant Turbine Manufacturer, with SiemensAnnual Report on U.S. Wind Power Installation, Cost, and

  2. Fiscal year 1996 well installation program summary, Y-12 Plant Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    NONE

    1997-04-01T23:59:59.000Z

    This report summarizes the well installation activities conducted during the federal fiscal year (FY) 1996 drilling program at the Oak Ridge Y-12 Plant, Oak Ridge Tennessee. Synopses of monitoring well construction/well development data, well location rationale, geological/hydrological observations, quality assurance/quality control methods, and health and safety monitoring are included. Two groundwater monitoring wells were installed during the FY 1996 drilling program. One of the groundwater monitoring wells was installed in the Lake Reality area and was of polyvinyl chloride screened construction. The other well, installed near the Ash Disposal Basin, was of stainless steel construction.

  3. INSTALLATION CERTIFICATE CF-6R-MECH-27-HERS Maximum Rated Total Cooling Capacity (Page 1 of 2)

    E-Print Network [OSTI]

    INSTALLATION CERTIFICATE CF-6R-MECH-27-HERS Maximum Rated Total Cooling Capacity (Page 1 of 2) Site of the installed system (Btu/hr) 3b Sum of the ARI Rated Total Cooling Capacities of multiple systems installed Cooling Capacities of the installed cooling systems must be calculated and entered in row 3b. 4a MRTCC

  4. CX-004502: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Determination Energy Efficiency and Conservation Block Grant: Installation of Photovoltaic System to Serve County of Monterey Laurel Yard Facilities (Activity 1) CX(s)...

  5. Preliminary assessment report for Army Aviation Support Facility No. 3, Installation 13307, Hunter Army Airfield, Savannah, Georgia. Installation Restoration Program

    SciTech Connect (OSTI)

    Kolpa, R.; Smith, K.

    1993-07-01T23:59:59.000Z

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Georgia Army National Guard property located on Hunter Army Airfield (HAA) near Savannah, Georgia, known as Army Aviation Support Facility (AASF) No. 3. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, types and quantities of hazardous substances utilized, the nature and amounts of wastes generated or stored at the facility, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the AASF No. 3 property, requirements of the Department of Defense Installation Restoration Program (IRP). The scope of this assessment is limited to the facilities and past activities contained within the area now occupied by AASF No. 3. However, this assessment report is intended to be read in conjunction with a previous IRP assessment of HAA completed in 1992 (USATHAMA 1992) and to provide comprehensive information on AASF No. 3 for incorporation with information contained in that previous assessment for the entirety of HAA.

  6. Design and Installation of a Disposal Cell Cover Field Test

    SciTech Connect (OSTI)

    Benson, C.H. [University of Wisconsin–Madison, Madison, Wisconsin; Waugh, W.J. [S.M. Stoller Corporation, Grand Junction, Colorado; Albright, W.H. [Desert Research Institute, Reno, Nevada; Smith, G.M. [Geo-Smith Engineering, Grand Junction, Colorado; Bush, R.P. [U.S. Department of Energy, Grand Junction, Colorado

    2011-02-27T23:59:59.000Z

    The U.S. Department of Energy’s Office of Legacy Management (LM) initiated a cover assessment project in September 2007 to evaluate an inexpensive approach to enhancing the hydrological performance of final covers for disposal cells. The objective is to accelerate and enhance natural processes that are transforming existing conventional covers, which rely on low-conductivity earthen barriers, into water balance covers, that store water in soil and release it as soil evaporation and plant transpiration. A low conductivity cover could be modified by deliberately blending the upper layers of the cover profile and planting native shrubs. A test facility was constructed at the Grand Junction, Colorado, Disposal Site to evaluate the proposed methodology. The test cover was constructed in two identical sections, each including a large drainage lysimeter. The test cover was constructed with the same design and using the same materials as the existing disposal cell in order to allow for a direct comparison of performance. One test section will be renovated using the proposed method; the other is a control. LM is using the lysimeters to evaluate the effectiveness of the renovation treatment by monitoring hydrologic conditions within the cover profile as well as all water entering and leaving the system. This paper describes the historical experience of final covers employing earthen barrier layers, the design and operation of the lysimeter test facility, testing conducted to characterize the as-built engineering and edaphic properties of the lysimeter soils, the calibration of instruments installed at the test facility, and monitoring data collected since the lysimeters were constructed.

  7. Institute for Critical Technology and Applied Science Seminar Series Silicone Materials for Sustainable

    E-Print Network [OSTI]

    Crawford, T. Daniel

    Institute for Critical Technology and Applied Science Seminar Series Silicone Materials; these goals are critical for the broad adoption of PV globally. Silicone polymers possess key material for Sustainable Energy: Emphasis on Photovoltaic Materials for Module Assembly and Installation with Ann Norris

  8. Lessons Learned from Net Zero Energy Assessments and Renewable Energy Projects at Military Installations

    SciTech Connect (OSTI)

    Callahan, M.; Anderson, K.; Booth, S.; Katz, J.; Tetreault, T.

    2011-09-01T23:59:59.000Z

    Report highlights the increase in resources, project speed, and scale that is required to achieve the U.S. Department of Defense (DoD) energy efficiency and renewable energy goals and summarizes the net zero energy installation assessment (NZEI) process and the lessons learned from NZEI assessments and large-scale renewable energy projects implementations at DoD installations.

  9. Installation of a bioreactor to the controller after sterilization for Pichia

    E-Print Network [OSTI]

    Strynadka, Natalie

    Part II Installation of a bioreactor to the controller after sterilization for Pichia Part II Installation of a bioreactor to the controller after sterilization for Pichia Prepared by Sung-Hye Hong sunghye jacket 1) Put the heating jacket around the bioreactor. SeptumSeptum TempTemp MotorMotorpHpH Mt-OHMt-OH d

  10. Installation of a bioreactor to the controller after sterilization for E.coli

    E-Print Network [OSTI]

    Strynadka, Natalie

    Part II Installation of a bioreactor to the controller after sterilization for E.coli Part II Installation of a bioreactor to the controller after sterilization for E.coli Prepared by Sung-Hye Hong sunghye jacketheating jacket 1) Put the heating jacket around the bioreactor. SeptumSeptum TempTemp MotorMotorpHpH dO2d

  11. Siphon penstock installations at hydroelectric projects: A survey of design, construction and operating experience

    SciTech Connect (OSTI)

    Burgoine, D.; Rodrigue, P.; Tarbell, J.C. (Acres International Corp., Amherst, NY (USA); Acres International Corp., Amherst, NY (USA). Mechanical Engineering Dept.; Acres International Corp., Amherst, NY (USA))

    1989-01-01T23:59:59.000Z

    There can be advantages to using siphon penstocks at small hydro projects, particularly those constructed at existing dams. One problem, however, is a lack of documentation of siphon penstock installations. The design considerations, construction and operating aspects of siphon penstock installations are described here. 4 figs., 1 tab.

  12. Solar Energy Development onSolar Energy Development on DoD Installations in the

    E-Print Network [OSTI]

    Solar Energy Development onSolar Energy Development on DoD Installations in the Mojave & Colorado and Implications fReport is available for download at: http://www.icfi.com/insights/reports/2012/full-report-solar the technical and economic potential to site solar on 9 major DoD installations in the Mojave and Colorado

  13. Planning and Installation Guide: North Carolina Compressed Natural Gas Fueling Stations

    E-Print Network [OSTI]

    1 Planning and Installation Guide: North Carolina Compressed Natural Gas Fueling Stations Introduction Are you considering installing a compressed natural gas (CNG) fueling station for your fleet to provide your fleet with fuel. One resource for locating and identifying public compressed natural gas

  14. Thermal Performance Impacts of Center-of-Glass Deflections in Installed Insulating

    E-Print Network [OSTI]

    LBNL-5800E Thermal Performance Impacts of Center-of- Glass Deflections in Installed Insulating Laboratory Windows and Envelope Materials Group Building Technology and Urban Systems Department: temperature difference Thermal Performance Impacts of Center-of-Glass Deflections in Installed Insulating

  15. Installation This manual is available in English on the enclosed CD.

    E-Print Network [OSTI]

    van Hemmen, J. Leo

    data center design and construction. This Publication has been compiled in good faith by American PowerInstallation InRow® RD Air Cooled ACRD100 ACRD101 #12;This manual is available in English Conversion Corpo- ration assumes no liability for damages, violations of codes, improper installation, system

  16. Volume XIX, No. 1 A publication of the U.S. Army Installation Management Command

    E-Print Network [OSTI]

    US Army Corps of Engineers

    Volume XIX, No. 1 A publication of the U.S. Army Installation Management Command January -- the New Landscape #12;Public Works Digest · January/February 2007 Public Works Digest is an unofficial publication of the U.S. Army Installation Management Command, under AR 360-1, The Army Public Affairs Program

  17. Background: Subsurface Water Retention Technology (SWRT) Durable and easy to install: Water

    E-Print Network [OSTI]

    Background: Subsurface Water Retention Technology (SWRT) Benefits Durable and easy to install: Water retaining membranes can last at least 40 years and can be installed quickly and costeffectively permeable marginal soils converting them to much higher production levels of food crops. Better water

  18. Solar heating and hot water system installed at Charlotte Memorial Hospital, Charlotte, North Carolina. Final report

    SciTech Connect (OSTI)

    None

    1981-05-01T23:59:59.000Z

    Included in this report is detailed information regarding the design and installation of a heating and hot water system in a commercial application. This information includes descriptions of system and building, design philosophy, control logic operation modes, design and installation drawing and a brief description of problems encountered and their solutions.

  19. INFO-F-309 Administration des Systmes TP1: Installation de Linux et gestion des packages

    E-Print Network [OSTI]

    Collette. Sébastien

    INFO-F-309 ­ Administration des Systčmes TP1: Installation de Linux et gestion des packagesBox. Ensuite nous verrons comment fonctionne la gestion de packages, la mise ŕ jour du systčme et l la gestion de packages. 2 Installation de Linux 2.1 Préparation Surtout lorsqu'il s'agit d'un serveur

  20. Applied ALARA techniques

    SciTech Connect (OSTI)

    Waggoner, L.O.

    1998-02-05T23:59:59.000Z

    The presentation focuses on some of the time-proven and new technologies being used to accomplish radiological work. These techniques can be applied at nuclear facilities to reduce radiation doses and protect the environment. The last reactor plants and processing facilities were shutdown and Hanford was given a new mission to put the facilities in a safe condition, decontaminate, and prepare them for decommissioning. The skills that were necessary to operate these facilities were different than the skills needed today to clean up Hanford. Workers were not familiar with many of the tools, equipment, and materials needed to accomplish:the new mission, which includes clean up of contaminated areas in and around all the facilities, recovery of reactor fuel from spent fuel pools, and the removal of millions of gallons of highly radioactive waste from 177 underground tanks. In addition, this work has to be done with a reduced number of workers and a smaller budget. At Hanford, facilities contain a myriad of radioactive isotopes that are 2048 located inside plant systems, underground tanks, and the soil. As cleanup work at Hanford began, it became obvious early that in order to get workers to apply ALARA and use hew tools and equipment to accomplish the radiological work it was necessary to plan the work in advance and get radiological control and/or ALARA committee personnel involved early in the planning process. Emphasis was placed on applying,ALARA techniques to reduce dose, limit contamination spread and minimize the amount of radioactive waste generated. Progress on the cleanup has,b6en steady and Hanford workers have learned to use different types of engineered controls and ALARA techniques to perform radiological work. The purpose of this presentation is to share the lessons learned on how Hanford is accomplishing radiological work.

  1. Technical Analysis of Installed Micro-Combined Heat and Power Fuel-Cell System

    SciTech Connect (OSTI)

    Brooks, Kriston P.; Makhmalbaf, Atefe

    2014-10-31T23:59:59.000Z

    Combined heat and power fuel cell systems (CHP-FCSs) provide consistent electrical power and hot water with greater efficiency and lower emissions than alternative sources. These systems can be used either as baseload, grid-connected, or as off-the-grid power sources. This report presents a technical analysis of 5 kWe CHP-FCSs installed in different locations in the U.S. At some sites as many as five 5 kWe system is used to provide up to 25kWe of power. Systems in this power range are considered “micro”-CHP-FCS. To better assess performance of micro-CHP-FCS and understand their benefits, the U.S. Department of Energy worked with ClearEdge Power to install fifteen 5-kWe PBI high temperature PEM fuel cells (CE5 models) in the commercial markets of California and Oregon. Pacific Northwest National Laboratory evaluated these systems in terms of their economics, operations, and technical performance. These units were monitored from September 2011 until June 2013. During this time, about 190,000 hours of data were collected and more than 17 billion data points were analyzed. Beginning in July 2013, ten of these systems were gradually replaced with ungraded systems (M5 models) containing phosphoric acid fuel cell technology. The new units were monitored until June 2014 until they went offline because ClearEdge was bought by Doosan at the time and the new manufacturer did not continue to support data collection and maintenance of these units. During these two phases, data was collected at once per second and data analysis techniques were applied to understand behavior of these systems. The results of this analysis indicate that systems installed in the second phase of this demonstration performed much better in terms of availability, consistency in generation, and reliability. The average net electrical power output increased from 4.1 to 4.9 kWe, net heat recovery from 4.7 to 5.4 kWth, and system availability improved from 94% to 95%. The average net system electric efficiency, average net heat recovery efficiency, and overall net efficiency of the system increased respectively from 33% to 36%, from 38% to 41%, and from 71% to 76%. The temperature of water sent to sit however reduced by about 16% from 51?C to 43 ?C. This was a control strategy and the temperature can be controlled depending on building heat demands. More importantly, the number of shutdowns and maintenance events required to keep the systems running at the manufacturer’s rated performance specifications were substantially reduced by about 76% (for 8 to 10 units running over a one-year period). From July 2012 to June 2013, there were eight CE5 units in operation and a total of 134 scheduled and unscheduled shutdowns took place. From July 2013 to June 2014, between two to ten units were in operation and only 32 shutdowns were reported (all unscheduled). In summary, the number of shutdowns reduced from 10 shutdowns per month on average for eight CE5units to an average of 2.7 shutdowns per month for M5 units (between two to ten units).

  2. Energy efficiency campaign for residential housing at the Fort Lewis army installation

    SciTech Connect (OSTI)

    AH McMakin; RE Lundgren; EL Malone

    2000-02-23T23:59:59.000Z

    In FY1999, Pacific Northwest National Laboratory conducted an energy efficiency campaign for residential housing at the Fort Lewis Army Installation near Tacoma, Washington. Preliminary weather-corrected calculations show energy savings of 10{percent} from FY98 for energy use in family housing. This exceeded the project's goal of 3{percent}. The work was funded by the U.S. DOEs Federal Energy Management Program (FEMP), Office of Energy Efficiency and Renewable Energy. The project adapted FEMP's national ``You Have the Power Campaign'' at the local level, tailoring it to the military culture. The applied research project was designed to demonstrate the feasibility of tailored, research-based strategies to promote energy conservation in military family housing. In contrast to many energy efficiency efforts, the campaign focused entirely on actions residents could take in their own homes, as opposed to technology or housing upgrades. Behavioral change was targeted because residents do not pay their own utility bills; thus other motivations must drive personal energy conservation. This campaign augments ongoing energy savings from housing upgrades carried out by Fort Lewis. The campaign ran from September 1998 through August 1999. The campaign strategy was developed based on findings from previous research and on input from residents and officials at Fort Lewis. Energy use, corrected to account for weather differences, was compared with the previous year's use. Survey responses from 377 of Fort Lewis residents of occupied housing showed that the campaign was moderately effective in promoting behavior change. Of those who were aware of the campaign, almost all said they were now doing one or more energy-efficient things that they had not done before. Most people were motivated by the desire to do the right thing and to set a good example for their children. They were less motivated by other factors.

  3. School of Applied Technology School of Applied Technology

    E-Print Network [OSTI]

    Heller, Barbara

    School of Applied Technology School of Applied Technology Daniel F. and Ada L. Rice Campus Illinois Institute of Technology 201 E. Loop Road Wheaton, IL 60187 630.682.6000 www.iit.edu/applied tech/ Dean and Academic Director, Information Technology and Management Programs: C. Robert Carlson Director of Operations

  4. School of Applied Technology School of Applied Technology

    E-Print Network [OSTI]

    Heller, Barbara

    School of Applied Technology School of Applied Technology Daniel F. and Ada L. Rice Campus Illinois Institute of Technology 201 E. Loop Road Wheaton, IL 60187 630.682.6000 www.iit.edu/applied tech/ Dean Technology and Management Programs: Mazin Safar Director, Marketing & Development: Scott Pfeiffer Director

  5. Analysis of heat pumps installed in family housing at Hunter Army Air Field

    SciTech Connect (OSTI)

    Parker, S.A.

    1994-08-01T23:59:59.000Z

    The US Army Forces Command (FORSCOM) tasked Pacific Northwest Laboratory (PNL) in support of the US Department of Energy (DOE) Federal Energy Management Program (FEMP) to conduct a postconstruction evaluation of the air-source heat pumps installed in family housing at Hunter Army Air Field (AAF). The objective of this project was to investigate and resolve concerns about an increase in energy costs at Hunter AAF following the installation of heat pumps in November 1992. After completing several analyses and a field inspection of the heat pumps in family housing at Hunter AAF, the following conclusions were made: the installation of air-source heat pumps reduced the annual energy cost in family housing by $46,672 in 1993; the heat pump thermostat controls in Hunter AAF family housing appear to be incorrectly installed; and the Hunter AAF electric utility bill increased 10% during the first 6 months of 1993 compared to the first 6 months of 1992.

  6. Net Zero Energy Military Installations: A Guide to Assessment and Planning

    SciTech Connect (OSTI)

    Booth, S.; Barnett, J.; Burman, K.; Hambrick, J.; Westby, R.

    2010-08-01T23:59:59.000Z

    The U.S. Department of Defense (DoD) recognizes the strategic importance of energy to its mission, and is working to reduce energy consumption and enhance energy self-sufficiency by drawing on local clean energy sources. A joint initiative formed between DoD and the U.S. Department of Energy (DOE) in 2008 to address military energy use led to a task force to examine the potential for net zero energy military installations, which would produce as much energy on site as they consume in buildings, facilities, and fleet vehicles. This report presents an assessment and planning process to examine military installations for net zero energy potential. Net Zero Energy Installation Assessment (NZEIA) presents a systematic framework to analyze energy projects at installations while balancing other site priorities such as mission, cost, and security.

  7. Retrofit Installations of Adjustable Speed Drives to Conserve Energy at Industrial Facilities

    E-Print Network [OSTI]

    Porcaro, C. R.; Galstaun, L. S.; Holmes, M. L.

    1984-01-01T23:59:59.000Z

    This paper is a progress report on a study funded by the Electrical Power Research Institute (EPRI). The purpose of the study is to identify and analyze existing installations that appear to offer opportunities for energy conservation through...

  8. PV Installation Labor Market Analysis and PV JEDI Tool Developments (Presentation)

    SciTech Connect (OSTI)

    Friedman, B.

    2012-06-01T23:59:59.000Z

    The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

  9. Monitoring and Mitigation Alternatives for Protection of North Atlantic Right Whales during Offshore Wind Farm Installation

    SciTech Connect (OSTI)

    Carlson, Thomas J.; Halvorsen, Michele B.; Matzner, Shari; Copping, Andrea E.; Stavole, Jessica

    2012-09-01T23:59:59.000Z

    Progress report on defining and determining monitoring and mitigation measures for protecting North Atlantic Right Whales from the effects of pile driving and other activities associated with installation of offshore wind farms.

  10. Building-Integrated Photovoltaics (BIPV) in the Residential Section: An Analysis of Installed Rooftop Prices (Presentation)

    SciTech Connect (OSTI)

    James, T.; Goodrich, A.; Woodhouse, M.; Margolis, R.; Ong, S.

    2012-06-01T23:59:59.000Z

    This powerpoint presentation to be presented at the World Renewable Energy Forum on May 17, 2012, in Denver, CO, discusses building-integrated photovoltaics (BIPV) in the residential section and includes an analysis of installed rooftop prices.

  11. Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006

    E-Print Network [OSTI]

    2008-01-01T23:59:59.000Z

    Annual Report on U.S. Wind Power Installation, Cost, and3 U.S. Wind Power Capacity Increased by 27% inAre Significant. . . . . . . 9 Wind Power Prices Are Up in

  12. Net Zero Energy Military Installations: A Guide to Assessment and Planning

    Office of Energy Efficiency and Renewable Energy (EERE)

    In 2008, DoD and DOE defined a joint initiative to address military energy use by identifying specific actions to reduce energy demand and increase use of renewable energy on DoD installations.

  13. Art installation of conic sea and peculiar angels and its affordances 

    E-Print Network [OSTI]

    Cooper, Trina Erica

    2009-05-15T23:59:59.000Z

    Installations attempt to expose everyday space by depicting an environment that appears normal yet has been altered in perceptibly unexpected ways. Such environments are typically designed to re-orient participants, giving them the feeling...

  14. INSTALLATION CERTIFICATE CF-6R-ENV-01 Envelope Insulation; Roofing; Fenestration (Page 1 of 3)

    E-Print Network [OSTI]

    INSTALLATION CERTIFICATE CF-6R-ENV-01 Envelope ­ Insulation; Roofing; Fenestration (Page 1 of 3:__________________________________ Brand Name:_______________________________ Thickness (inches):_________________________ Thermal:_______________________________ Thickness (inches):_________________________ Thermal Resistance (R-Value):_________________ Perimeter

  15. Atomic Energy and Radioactive Substances: Licensing and Regulation of Sites: The Nuclear Installations Regulations, 1962 

    E-Print Network [OSTI]

    Wood, Richard; Maclay, John. S.

    1962-01-01T23:59:59.000Z

    These regulations, made by the Minister of Power and the Secretary of State for Scotland acting jointly, prescribe for the purpose of subsection (1)(b) of section one of the Nuclear Installations (Licensing and Insurance) Act, 1959, certain classes...

  16. Deficiencies of Lighting Codes and Ordinances in Controlling Light Pollution from Parking Lot Lighting Installations

    E-Print Network [OSTI]

    Royal, Emily

    2012-05-31T23:59:59.000Z

    The purpose of this research was to identify the main causes of light pollution from parking lot electric lighting installations and highlight the deficiencies of lighting ordinances in preventing light pollution. Using an industry-accepted lighting...

  17. Permits to Install,New Source Review (PTI,NSR)  (Michigan)

    Broader source: Energy.gov [DOE]

    Rule 201 of the Michigan Air Pollution Control Rules requires a person to obtain an approved Permit to Install for any potential source of air pollution unless the source is exempt from the...

  18. Utility Scale Renewable Energy Development Near DOD Installations: Making the Case for Land Use Compatitbility

    Broader source: Energy.gov [DOE]

    Presentation covers Utility Scale Renewable Energy Development Near DOD Installations and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Rapid City, South Dakota.

  19. Microsoft Word - CX-RossComplexComcastFiberInstall_WEB.doc

    Broader source: Energy.gov (indexed) [DOE]

    1 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Dawneen Dostert Realty Specialist - TERR-LMT Proposed Action: Allow installation of new fiber optic cable PP&A...

  20. DCC Digital Curation Manual: Instalment on Open Source for Digital Curation 

    E-Print Network [OSTI]

    McHugh, Andrew

    2005-08-01T23:59:59.000Z

    Instalment on the role of open source software within the digital curation lifecycle. Describes a range of explicit digital curation application areas for open source, some examples of existing uses of open source software, ...

  1. Art installation of conic sea and peculiar angels and its affordances

    E-Print Network [OSTI]

    Cooper, Trina Erica

    2009-05-15T23:59:59.000Z

    Installations attempt to expose everyday space by depicting an environment that appears normal yet has been altered in perceptibly unexpected ways. Such environments are typically designed to re-orient participants, giving them the feeling...

  2. Consider Installing High-Pressure Boilers with Backpressure Turbine-Generators

    SciTech Connect (OSTI)

    Not Available

    2006-01-01T23:59:59.000Z

    This revised ITP tip sheet on installing high-pressure boilers provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  3. California Solar Initiative (CSI) Thermal Program Metering Installation Guide Purpose: The purpose of this metering installation guide is to provide participating eligible contractors

    E-Print Network [OSTI]

    1 California Solar Initiative (CSI) Thermal Program Metering Installation Guide Purpose and monitoring purposes: Customer Performance Monitoring (CPM), Opt-in Measurement and Evaluation (M&E) and 70 with interpreting the following schematics. 1. Customer Performance Monitoring (CPM) For CPM, metering either

  4. The ATLAS Software Installation System v2: a highly available system to install and validate Grid and Cloud sites via Panda

    E-Print Network [OSTI]

    De Salvo, Alessandro; The ATLAS collaboration; Smirnov, Yuri; Sanchez, Arturo

    2015-01-01T23:59:59.000Z

    The ATLAS Installation System v2 is the evolution of the original system, used since 2003. The original tool has been completely re-designed in terms of database backend and components, adding support for submission to multiple backends, including the original WMS and the new Panda modules. The database engine has been changed from plain MySQL to Galera/Percona and the table structure has been optimized to allow a full High-Availability (HA) solution over WAN. The servlets, running on each frontend, have been also decoupled from local settings, to allow an easy scalability of the system, including the possibility of an HA system with multiple sites. The clients can also be run in multiple copies and in different geographical locations, and take care of sending the installation and validation jobs to the target Grid or Cloud sites. Moreover, the Installation DB is used as source of parameters by the automatic agents running in CVMFS, in order to install the software and distribute it to the sites. The system i...

  5. MODELING ATMOSPHERIC RELEASES OF TRITIUM FROM NUCLEAR INSTALLATIONS

    SciTech Connect (OSTI)

    Okula, K

    2007-01-17T23:59:59.000Z

    Tritium source term analysis and the subsequent dispersion and consequence analyses supporting the safety documentation of Department of Energy nuclear facilities are especially sensitive to the applied software analysis methodology, input data and user assumptions. Three sequential areas in tritium accident analysis are examined in this study to illustrate where the analyst should exercise caution. Included are: (1) the development of a tritium oxide source term; (2) use of a full tritium dispersion model based on site-specific information to determine an appropriate deposition scaling factor for use in more simplified, broader modeling, and (3) derivation of a special tritium compound (STC) dose conversion factor for consequence analysis, consistent with the nature of the originating source material. It is recommended that unless supporting, defensible evidence is available to the contrary, the tritium release analyses should assume tritium oxide as the species released (or chemically transformed under accident's environment). Important exceptions include STC situations and laboratory-scale releases of hydrogen gas. In the modeling of the environmental transport, a full phenomenology model suggests that a deposition velocity of 0.5 cm/s is an appropriate value for environmental features of the Savannah River Site. This value is bounding for certain situations but non-conservative compared to the full model in others. Care should be exercised in choosing other factors such as the exposure time and the resuspension factor.

  6. Proposal for the award of a contract for the provision of maintenance services for electrical installations on the CERN site

    E-Print Network [OSTI]

    2014-01-01T23:59:59.000Z

    Proposal for the award of a contract for the provision of maintenance services for electrical installations on the CERN site

  7. Proposal for the award of a contract for the supply and installation of two thyristor-controlled reactors for LEP

    E-Print Network [OSTI]

    1986-01-01T23:59:59.000Z

    Proposal for the award of a contract for the supply and installation of two thyristor-controlled reactors for LEP

  8. Proposal for the Award of a Contract for the Supply and Installation of Two Thyristor-Controlled Reactor Plants

    E-Print Network [OSTI]

    1991-01-01T23:59:59.000Z

    Proposal for the Award of a Contract for the Supply and Installation of Two Thyristor-Controlled Reactor Plants

  9. Proposal for the award of a contract for the provision of electrical installation services on the CERN site

    E-Print Network [OSTI]

    2015-01-01T23:59:59.000Z

    Proposal for the award of a contract for the provision of electrical installation services on the CERN site

  10. Adjudication Concerning the Contract for the Maintenance of Pipework and Heating, Ventilating and Air-Conditioning Installations

    E-Print Network [OSTI]

    1971-01-01T23:59:59.000Z

    Adjudication Concerning the Contract for the Maintenance of Pipework and Heating, Ventilating and Air-Conditioning Installations

  11. Adjudication of a Contract for the Maintenance of Pipework and Heating, Ventilating and Air-Conditioning Installations

    E-Print Network [OSTI]

    1977-01-01T23:59:59.000Z

    Adjudication of a Contract for the Maintenance of Pipework and Heating, Ventilating and Air-Conditioning Installations

  12. Proposed Adjudication of the Contract for the Heating, Ventilating and Air Conditioning Installations for the ISR Buildings

    E-Print Network [OSTI]

    1968-01-01T23:59:59.000Z

    Proposed Adjudication of the Contract for the Heating, Ventilating and Air Conditioning Installations for the ISR Buildings

  13. Proposal for the Award of a Contract for Maintenance, Operation and Minor Installation Work for CERN Cooling and HVAC Systems

    E-Print Network [OSTI]

    1996-01-01T23:59:59.000Z

    Proposal for the Award of a Contract for Maintenance, Operation and Minor Installation Work for CERN Cooling and HVAC Systems

  14. Nuclear facilities: criteria for the design and operation of ventilation systems for nuclear installations other than nuclear reactors

    E-Print Network [OSTI]

    International Organization for Standardization. Geneva

    2004-01-01T23:59:59.000Z

    Nuclear facilities: criteria for the design and operation of ventilation systems for nuclear installations other than nuclear reactors

  15. Facility Energy Decision System (FEDS) Assessment Report for US Army Garrison, Japan - Honshu Installations

    SciTech Connect (OSTI)

    Kora, Angela R.; Brown, Daryl R.; Dixon, Douglas R.

    2010-03-09T23:59:59.000Z

    This report documents an assessment was performed by a team of engineers from Pacific Northwest National Laboratory (PNNL) under contract to the Installation Management Command (IMCOM) Pacific Region Office (PARO). The effort used the Facility Energy Decision System (FEDS) model to determine how energy is consumed at five U.S. Army Garrison-Japan (USAG-J) installations in the Honshu area, identify the most cost-effective energy retrofit measures, and calculate the potential energy and cost savings.

  16. Behavior of 10 full-scale ground anchors installed in stiff clay

    E-Print Network [OSTI]

    Powers, William Francis

    1993-01-01T23:59:59.000Z

    for Anchor Installation . Drill Bit Grout Pump Top View of Hollow Stem Auger . Typical Borehole Extensometer Typical Testing Arrangement Schematic Showing Testing Equipment Strain Indicator Box Used to Read Load Cell Equipment Used to Monitor Load... Anchors Used in Current Practice (a) Straight-Shafted; (b) Single-Underreamed; (c) Multi-Underreamed; (d) Post-Grouted Anchor T pe Grouting Technique Installation Equipment Suitable Soil T pe ~ Straight-Shafted Low Pressure Hollow Stem Auger Rotary...

  17. Installation Of Service Connections For Sensors Or Transmitters In Buried Water Pipes

    DOE Patents [OSTI]

    Burnham, Alan K. (Livermore, CA); Cooper, John F. (Oakland, CA)

    2006-02-21T23:59:59.000Z

    A system for installing warning units in a buried pipeline. A small hole is drilled in the ground to the pipeline. A collar is affixed to one of the pipes of the pipeline. A valve with an internal passage is connected to the collar. A hole is drilled in the pipe. A warning unit is installed in the pipe by moving the warning unit through the internal passage, the collar, and the hole in the pipe.

  18. Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007

    E-Print Network [OSTI]

    Wiser, Ryan

    2009-01-01T23:59:59.000Z

    10-100 kW >100 kW Tracking the Sun: The Installed Cost ofout over five years. Tracking the Sun: The Installed Cost ofU.S. from 1998-2007 Tracking the Sun: The Installed Cost of

  19. Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008

    E-Print Network [OSTI]

    Barbose, Galen L

    2010-01-01T23:59:59.000Z

    2008 BACK PAGE Tracking the Sun II: The Installed Cost of10-100 kW >100 kW Tracking the Sun II: The Installed Cost ofSystems MW Total Tracking the Sun II: The Installed Cost of

  20. Dismantling of alpha contaminated obsolete installations and glove boxes on the IRMM site in Geel (Belgium)

    SciTech Connect (OSTI)

    Cretskens, Pieter; Lenie, Koen [Tecnubel NV, Gravenstraat 77, B-2480 Dessel (Belgium); Melis, Gustaaf [IRMM JRC, Retieseweg 111, B-2440 Geel (Belgium)

    2007-07-01T23:59:59.000Z

    At the Institute for Reference Materials and Measurements (European commission, Joint Research Centre, IRMM) a dismantling campaign of obsolete installations and glove boxes has been carried out in 2005. There were various reasons for their removal. Some large installations did not meet modern safety standards, other installations were worn out and expected to cause a radioactive contamination risk in the future. The main goal was to create as less waste as possible by extensive contamination checks and by decontamination if necessary. For the glove boxes, decontamination was not possible. A controlled area was set up around the installation to be dismantled in order to prevent spreading of contamination from dust and dirt. This was only possible for the 'minor' contaminated installations. The dismantling campaign of the glove boxes was carried out by using tents of two types depending the contamination inside the glove boxes. The most common glove boxes were dismantled in a tent constructed with hard surfaced polycarbonate plates (ventilated cell). For glove boxes with higher contamination, the same principle was used but with a second 'glove box tent' inside (ventilated glove tent). The purpose of this project was to learn from the experience of this campaign which gave the ability to make estimates of future radioactive waste or classic waste that could be expected from dismantled installations. (authors)

  1. Certification for Small Wind Turbine Installers: What's the Hang Up?; Preprint

    SciTech Connect (OSTI)

    Oteri, F.; Sinclair, K.

    2012-03-01T23:59:59.000Z

    Several programs have been implemented to support the advancement of a professional, mature small wind industry and to ensure that this industry moves forward in a sustainable direction. The development of a standard for small wind turbine systems and the creation of the Small Wind Certification Council support small wind technology that is reliable and safe. Consumers and incentive programs will ultimately rely on certification to differentiate among systems sold in the U.S. market. Certification of small wind installers is yet another component deemed necessary for this industry to expand. The National Renewable Energy Laboratory, under the guidance and funding support of the U.S. Department of Energy, supported the development of small wind system installer certification provided via the North American Board of Certified Energy Practitioners. However, the small wind community is not supportive of the installer certification. There are currently only nine certified installers in the U.S. pool. This paper provides an overview of the installer certification program and why more small wind turbine installers are not pursuing this certification.

  2. Applied inductive learning Louis Wehenkel

    E-Print Network [OSTI]

    Wehenkel, Louis

    problems 20 2.3.1 Classes 20 2.3.2 Types of classi cation problems 20 2.3.3 Learning and test sets 21 2Applied inductive learning Louis Wehenkel University of Li`ege Faculty of Applied Sciences Course;#12;APPLIED INDUCTIVE LEARNING COURSE NOTES : OCTOBER 2000 LOUIS A. WEHENKEL University of Li#12;ege

  3. Applied inductive learning Louis Wehenkel

    E-Print Network [OSTI]

    Wehenkel, Louis

    .3.2 Types of classification problems 20 2.3.3 Learning and test sets 21 2.3.4 Decision or classificationApplied inductive learning Louis Wehenkel University of Liâ??ege Faculty of Applied Sciences Courseâ??e'' #12; #12; APPLIED INDUCTIVE LEARNING COURSE NOTES : OCTOBER 2000 LOUIS A. WEHENKEL University of Li

  4. Journal of Applied Ecology 2004

    E-Print Network [OSTI]

    Holl, Karen

    Journal of Applied Ecology 2004 41, 922­933 © 2004 British Ecological Society Blackwell Publishing-scale, Sacramento River, succession, vegetation Journal of Applied Ecology (2004) 41, 922­933 Introduction More than@ucsc.edu). #12;923 Riparian forest restoration © 2004 British Ecological Society, Journal of Applied Ecology, 41

  5. Journal of Applied Ecology 2002

    E-Print Network [OSTI]

    Holl, Karen

    Journal of Applied Ecology 2002 39, 960­970 © 2002 British Ecological Society Blackwell Science- tion, succession. Journal of Applied Ecology (2002) 39, 960­970 Introduction Efforts to reclaim@ucsc.edu). #12;961 Vegetation on reclaimed mines © 2002 British Ecological Society, Journal of Applied Ecology

  6. Applying Mathematics.... ... to catch criminals

    E-Print Network [OSTI]

    O'Leary, Michael

    Applying Mathematics.... ... to catch criminals Mike O'Leary Department of Mathematics Towson University Stevenson University Kappa Mu Epsion 2008 Mike O'Leary (Towson University) Applying mathematics Department Mike O'Leary (Towson University) Applying mathematics to catch criminals September 10, 2008 2 / 42

  7. Tracking the Sun IV: An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010

    E-Print Network [OSTI]

    Darghouth, Naim

    2012-01-01T23:59:59.000Z

    The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-

  8. Tracking the Sun IV: An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010

    E-Print Network [OSTI]

    Darghouth, Naim

    2012-01-01T23:59:59.000Z

    number of systems and installed capacity; the sample size3). In terms of installed capacity, however, the sample iswith 47% of the total installed capacity in the data sample

  9. Tracking the Sun VI: An Historical Summary of the Installed Price of Photovoltaics in the United States from 1998 to 2012

    E-Print Network [OSTI]

    Barbose, Galen

    2014-01-01T23:59:59.000Z

    Laboratory. Tracking the Sun VI: The Installed Price ofRange ?10 kW Tracking the Sun VI: The Installed Price ofRange ?10 kW Tracking the Sun VI: The Installed Price of

  10. Tracking the Sun V: An Historical Summary of the Installed Price of Photovoltaics in the United States from 1998 to 2011

    E-Print Network [OSTI]

    Barbose, Galen

    2014-01-01T23:59:59.000Z

    Council, Inc. Tracking the Sun V: The Installed Price ofapplications). Tracking the Sun V: The Installed Price ofEnergy Agency. Tracking the Sun V: The Installed Price of

  11. Fiscal year 1995 well installation program summary Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    NONE

    1995-09-01T23:59:59.000Z

    This report summarizes the well installation activities conducted during the federal fiscal year (FY) 1995 drilling program at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (including activities that were performed in late FY 1994, but not included in the FY 1994 Well Installation Program Summary Report). Synopses of monitoring well construction/well development data, well location rationale, geological/hydrological observations, quality assurance/quality control methods, and health and safety monitoring are included. Three groundwater monitoring wells and two gas monitoring probes were installed during the FY 1995 drilling program. One of the groundwater monitoring wells was installed at Landfill VI, the other two in the Boneyard/Burnyard area. All of the groundwater monitoring wells were constructed with stainless steel screens and casings. The two gas monitoring probes were installed at the Centralized Sanitary Landfill II and were of polyvinyl chloride (PVC) screened construction. Eleven well rehabilitation/redevelopment efforts were undertaken during FY 1995 at the Y-12 Plant. All new monitoring wells and wells targeted for redevelopment were developed by either a 2.0-in. diameter swab rig or by hand bailing until nonspecific parameters (pH and specific conductance) attained steady-state levels. Turbidity levels were lowered, if required, to the extent practicable by continued development beyond a steady-state level of pH and conductance.

  12. -RECORDING RELATIVE WATER TABLE DEPTH USING PVC TAPE DISCOLOURATION -21 Applied Vegetation Science 8: 21-26, 2005

    E-Print Network [OSTI]

    Navrátilová, Jana

    - RECORDING RELATIVE WATER TABLE DEPTH USING PVC TAPE DISCOLOURATION - 21 Applied Vegetation during restoration. The PVC tape discolouration method enables spatially and temporally extensive studies and the same variables indicated by discolouration of PVC tape attached to green bamboo stakes installed

  13. The Impact of City-level Permitting Processes on Residential Photovoltaic Installation Prices and Development Times: An Empirical Analysis of Solar Systems in California Cities

    E-Print Network [OSTI]

    Wiser, Ryan

    2014-01-01T23:59:59.000Z

    and Utility-Scale Photovoltaic System Prices in the UnitedResidential Photovoltaic Installation Prices and DevelopmentResidential Photovoltaic Installation Prices and Development

  14. Tracking the Sun IV: An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010

    E-Print Network [OSTI]

    Darghouth, Naim

    2012-01-01T23:59:59.000Z

    October 2010. The installed cost data presented within thatinfrastructure. Preliminary cost data for the first half ofmissing installed cost data (1,030 systems) or system size

  15. Maximizing the Value of Photovoltaic Installations on Schools in California: Choosing the Best Electricity Rates

    SciTech Connect (OSTI)

    Ong, S.; Denholm, P.

    2011-07-01T23:59:59.000Z

    Schools in California often have a choice between multiple electricity rate options. For schools with photovoltaic (PV) installations, choosing the right rate is essential to maximize the value of PV generation. The rate option that minimizes a school?s electricity expenses often does not remain the most economical choice after the school installs a PV system. The complex interaction between PV generation, building load, and rate structure makes determining the best rate a challenging task. This report evaluates 22 rate structures across three of California?s largest electric utilities--Pacific Gas and Electric Co. (PG&E), Southern California Edison (SCE), and San Diego Gas and Electric (SDG&E)--in order to identify common rate structure attributes that are favorable to PV installations.

  16. Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility

    SciTech Connect (OSTI)

    Jack Q. Richardson

    2012-06-28T23:59:59.000Z

    Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project cost match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.

  17. APPLIED TECHNOLOGY Strategic Plan Summary

    E-Print Network [OSTI]

    Heller, Barbara

    and collaborative technology-based support for the proposed Innovation Center and the Entrepreneurship Academy. We research centers­CNR, CPI, and CSP. Establish a food safety and processing technology hub/incubator/innovationSCHOOL OF APPLIED TECHNOLOGY Strategic Plan Summary #12;School of Applied Technology Strategic Plan

  18. Calendar years 1989 and 1990 monitoring well installation program Y-12 plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1991-10-01T23:59:59.000Z

    This report documents the well-construction activities at the Y-12 Plant in Oak Ridge, Tennessee during 1989 and 1990. The well- construction program consisted of installing seventy-five monitoring wells. Geologists from ERCE (formally the Engineering, Design and Geosciences Group) and Martin Marietta Energy Systems (Energy Systems), supervised and documented well-construction activities and monitored for health and safety concerns. Sixty-seven monitoring wells were installed under the supervision of an ERCE geologist from March 1989 to September 1990. Beginning in September 1990, Energy Systems supervised drilling activities for eight monitoring wells, the last of which was completed in December 1990. 9 refs., 3 figs., 2 tabs.

  19. Installing and Running AIM 2.3.1 in a Clustered Server Production Environment

    SciTech Connect (OSTI)

    Walker, J.H.

    2003-09-11T23:59:59.000Z

    High availability and redundancy were required for a 24/7 technical baseline at a nuclear production facility. Process engineering, operations, and maintenance all had to connect to the AIM workflow and data management system at the plant. 24-hour availability and 100 percent data integrity were requirements. AIM 2.3.1 satisfied these needs by running in a clustered environment, using shared RAID 5 data storage installed with Oracle Fail Safe on clustered WinNT 4.0 Servers. Order of installation was critical for successful operation. The system has been running in production for 12 months with minimal downtime, and zero loss of data.

  20. Electrical installations in oil shale mines. Open file report 21 Sep 81-13 Aug 83

    SciTech Connect (OSTI)

    Gillenwater, B.B.; Kline, R.J.; Paas, N.

    1983-08-01T23:59:59.000Z

    This report presents recommended guidelines and regulatory changes applicable to electrical installations in underground oil shale mines. These recommendations are based on information gathered from oil shale operators, government agencies, and other knowledgeable sources familiar with existing plans for mining systems and electrical installations, and on present understanding of the problems and hazards associated with oil shale mining. Additional discussions of specific electrical problems related to oil shale mining include ground fault current levels, permissible electric wheel motors, permissible batteries and electric starting systems, intrinsically safe instrumentation, and applicability of existing test standards.

  1. Department of Applied Mathematics Department of Applied Mathematics

    E-Print Network [OSTI]

    Heller, Barbara

    , computational mathematics, discrete applied mathematics, and stochas- tics. More detailed descriptions of Philosophy in Collegiate Mathematics Education (joint program with the Department of Mathematics and Science Education) Research Facilities The department provides students with office space equipped with computers

  2. Hopper Installation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC) EnvironmentalGyroSolé(tm) HarmonicbetandEnergy 2010 A selectionFile Storage

  3. Measure Guideline: Installing Rigid Foam Insulation on the Interior of Existing Brick Walls

    SciTech Connect (OSTI)

    Natarajan, H.; Klocke, S.; Puttagunta, S.

    2012-06-01T23:59:59.000Z

    This measure guideline provides information on an effective method to insulate the interior of existing brick masonry walls with extruded polystyrene (XPS) insulation board. The guide outlines step-by-step design and installation procedures while explaining the benefits and tradeoffs where applicable. The authors intend that this document be useful to a varied audience that includes builders, remodelers, contractors and homeowners.

  4. Solar Schools Assessment and Implementation Project: Financing Options for Solar Installations on K-12 Schools

    SciTech Connect (OSTI)

    Coughlin, J.; Kandt, A.

    2011-10-01T23:59:59.000Z

    This report focuses on financial options developed specifically for renewable energy and energy efficiency projects in three California public school districts. Solar energy systems installed on public schools have a number of benefits that include utility bill savings, reductions in greenhouse gas emissions (GHGs) and other toxic air contaminants, job creation, demonstrating environmental leadership, and creating learning opportunities for students. In the 2011 economic environment, the ability to generate general-fund savings as a result of reducing utility bills has become a primary motivator for school districts trying to cut costs. To achieve meaningful savings, the size of the photovoltaic (PV) systems installed (both individually on any one school and collectively across a district) becomes much more important; larger systems are required to have a material impact on savings. Larger PV systems require a significant financial commitment and financing therefore becomes a critical element in the transaction. In simple terms, school districts can use two primary types of ownership models to obtain solar installations and cost savings across a school district. The PV installations can be financed and owned directly by the districts themselves. Alternatively, there are financing structures whereby another entity, such as a solar developer or its investors, actually own and operate the PV systems on behalf of the school district. This is commonly referred to as the 'third-party ownership model.' Both methods have advantages and disadvantages that should be weighed carefully.

  5. “What Efficiency Projects are Being Installed in the Pulp and Paper Industry”

    E-Print Network [OSTI]

    Nicol, J.

    2008-01-01T23:59:59.000Z

    The Wisconsin Focus on Energy program has seven years of experience on the actual projects that are being installed in the Pulp and Paper industry. The program has a broad perspective on the types and trends of investments in energy efficiency...

  6. 1.5 MW turbine installation at NREL's NWTC on Aug. 21

    ScienceCinema (OSTI)

    None

    2013-05-29T23:59:59.000Z

    Generating 20 percent of the nation's electricity from clean wind resources will require more and bigger wind turbines. NREL is installing two large wind turbines at the National Wind Technology Center to examine some of the industry's largest machines and address issues to expand wind energy on a commercial scale.

  7. Design Considerations, Installation and Operation of the Two-Stage Parallel Flow Absorption Chiller

    E-Print Network [OSTI]

    Hufford, P. E.

    1984-01-01T23:59:59.000Z

    combustion engines, or process flow to provide the elergy to the first stage generator. There are a nmber of installations currently opera- ting in South,zrn California where the exhaust from gas turbines is being taken directly into the two- stage...

  8. THE LOW-TEMPERATURE THRESHOLD FOR PINK SALMON EGGS IN RELATION TO A PROPOSED HYDROELECTRIC INSTALLATION

    E-Print Network [OSTI]

    Alaska would alter the seasonal pattern of stream temperatures and pose a threat to the natural (now the Alaska Power Administration) started feasibil- ity studies on a hydroelectric installation of the water from Grace Creek through a hydroelectric plant and back into Grace Creek about 1.2 km from tide

  9. Wireless sensor networks for off-shore oil and gas installations

    E-Print Network [OSTI]

    Gjessing, Stein

    1 Wireless sensor networks for off-shore oil and gas installations Martin Dalbro, Erik Eikeland ­ Underwater development and production of oil and gas needs networked sensors and actuators to monitor the production process, to either prevent or detect oil and gas leakage or to enhance the production flow

  10. Structural evaluation of mixer pump installed in Tank 241-AN-107 for caustic addition project

    SciTech Connect (OSTI)

    Leshikar, G.A.

    1995-06-16T23:59:59.000Z

    This report documents the structural analysis and evaluation of a mixer pump and caustic addition system to be used in Tank 107-AN. This pump will be installed in the central pump pit of this double- shell tank for the purpose of bringing the hydroxide ion concentration into compliance with Tank Farm operating specifications.

  11. Training Community College faculty in the techniques and skills required for Solar Energy System installation

    SciTech Connect (OSTI)

    Leo, R.J.

    1980-05-01T23:59:59.000Z

    A project to train a specified number of community college, vocational/technical faculty in the techniques and skills required to install solar energy systems is described. The planning that led to the contract, the development and conduct of the training workshops, and the outcomes are detailed. An overall evaluation of the project and recommendations for the future are included. (MHR)

  12. Volume XVIII, No. 5 A publication of the U.S. Army Installation Management Agency

    E-Print Network [OSTI]

    US Army Corps of Engineers

    : Corporate Visions, Inc. Washington, DC On the cover: A worker installs photovoltaic solar panels on Bldg 20-21 Fort McCoy work force asked to reduce energy use, costs by Rob Schuette 22-23 Solar panels help. Chvala Jr., Daryl Brown and Jim Dirks 26-27 Ground-coupled heat pumps save energy, money at Fort Knox

  13. Solar heating and cooling of residential buildings: sizing, installation and operation of systems. 1980 edition

    SciTech Connect (OSTI)

    None

    1980-09-01T23:59:59.000Z

    This manual was prepared as a text for a training course on solar heating and cooling of residential buildings. The course and text are directed toward sizing, installation, operation, and maintenance of solar systems for space heating and hot water supply, and solar cooling is treated only briefly. (MHR)

  14. Potential for substitution of geothermal energy at domestic defense installations and White Sands Missile Range

    SciTech Connect (OSTI)

    Bakewell, C.A.; Renner, J.L.

    1982-01-01T23:59:59.000Z

    Geothermal resources that might provide substitute energy at any of 76 defense installations are identified and evaluated. The geologic characteristics and related economics of potential geothermal resources located at or near the 76 installations were estimated. The geologic assessment identified 18 installations with possible geothermal resources and 4 Atlantic Coastal Plain resource configurations that represented the alternatives available to East Coast bases. These 18 locations and 4 resource configurations, together with 2 possible resources at the White Sands Missile Range and a potential resource at Kings Bay, Georgia, were examined to determine the relative economics of substituting potential geothermal energy for part or all of the existing oil, gas, and electrical energy usage. Four of the military installations - Mountain Home, Norton, Hawthorne, and Sierra - appear to be co-located with possible geothermal resources which, if present, might provide substitute energy at or below current market prices for oil. Six additional locations - Ellsworth, Luke, Williams, Bliss, Fallon, and Twentynine Palms - could become economically attractive under certain conditions. No geothermal resource was found to be economically competitive with natural gas at current controlled prices. Generation of electric power at the locations studied is estimated to be uneconomic at present.

  15. Compact passive wireless reinforced concrete corrosion initiation sensor that can be installed in existing steel

    E-Print Network [OSTI]

    Boyer, Edmond

    with a resolution of less than 10 mV. The sensor is 25 mm in diameter and is intended to be installed by drilling of reinforcement steel is Cl- ingression from the de-icing salts used extensively to clear snow and ice in winter

  16. Financing Solar Installations with New Markets Tax Credits: Denver, Colorado (Fact Sheet)

    SciTech Connect (OSTI)

    Coughlin, J.

    2010-09-01T23:59:59.000Z

    Fact sheet provides a brief overview of New Markets Tax Credits (NMTCs), a third-party financing incentive for solar installations in the public sector. NMTCs are intended to encourage economic activity in low-income and disadvantaged neighborhoods. The use of NMTCs in an innovative solar project transaction by the City of Denver, Colorado, is highlighted.

  17. Volume XVI, No. 5 A publication of the U.S. Army Installation Management Agency

    E-Print Network [OSTI]

    US Army Corps of Engineers

    Sain 12 Energy audit at Army lab shows opportunities to conserve by David Underwood 13 FY 2004 Annual/October 2004 U.S. Army Installation Management Agency In this issue: Energy Management and Water Conservation .................................................................................................................................................................................... 4 2004 Energy and Water Management awards by David Purcell 5 USMA wins award for energy efficiency 6

  18. Hawaii Natural Energy Institute installs PV systems at public schools Pacific Business News

    E-Print Network [OSTI]

    the performance of traditional and emerging PV materials and inverter technologies," Institute Director Richard of the inverters, which convert direct current or DC power generated by the PV panels into alternating currentHawaii Natural Energy Institute installs PV systems at public schools Pacific Business News

  19. inverters, offering less weight, higher efficiency, and lower-cost installations.

    E-Print Network [OSTI]

    Johnson, Eric E.

    inverters, offering less weight, higher efficiency, and lower- cost installations. The electrical. These locking connectors will also soon appear on most, if not all, PV modules--although they are only required when the PV array wiring is operating above 30 volts and is readily accessible. Another 2008 NEC

  20. Transportation Services Fueling Operation Transportation Services has installed a software system that will facilitate fueling of

    E-Print Network [OSTI]

    Transportation Services Fueling Operation Transportation Services has installed a software system into this system. All University vehicles that wish to fuel at UH M noa Transportation Services will be required the application below and submit your application to Transportation Services before attempting to fuel your

  1. EIFAC 2006: DAMS, WEIRS AND FISH Long-term effects of hydropower installations

    E-Print Network [OSTI]

    McCarthy, T.K.

    EIFAC 2006: DAMS, WEIRS AND FISH Long-term effects of hydropower installations and associated river on stocking lakes with elvers and fingerling eels. These were trapped at the hydropower facilities.) stocks is a matter of great concern and Guest editors: R. L. Welcomme & G. Marmulla Hydropower, Flood

  2. SONY GXB5005 GPS RECEIVER DATA Without shield can Installed With shield can in place

    E-Print Network [OSTI]

    Berns, Hans-Gerd

    SONY GXB5005 GPS RECEIVER DATA Without shield can Installed With shield can in place (for illustrative purposes only) The Sony GXB5005 GPS receiver is a miniature 12 channel GPS module with support for WAAS/EGNOS augmented positioning. The receiver is based on Sony's CXD2951 single-chip GPS receiver IC

  3. BSR/CSA C448-201x, Design and Installation of Earth Energy Bi

    E-Print Network [OSTI]

    -loop earth energy heat pump systems Annex B Site survey worksheet Annex C Method for determining sizing · CM Engineering · HRAI · City of Calgary · Geo-Flo Products · Heat-Line Corporation · Government for Commercial and Institutional Buildings (ICI) C448.1 Design and Installation for Residential / Small Buildings

  4. Volume XIX, No. 6 A publication of the U.S. Army Installation Management Command

    E-Print Network [OSTI]

    US Army Corps of Engineers

    27 Late-breaking news: facilities regulation is out 28 Water model helps installations address Energy is one of many the U.S. Army Corps of Engineers, Europe District handed over to the Georgian government Allen 9-12 Huntsville Center projects range from saving energy to designing state-of-the-art facilities

  5. Tentative criteria for the design and installation of electrical power systems subject to seismic hazard

    SciTech Connect (OSTI)

    Parise, G.; Ferranti, F. [Univ. of Rome La Sapienza (Italy). Electrical Engineering Dept.; Colozza, R.

    1995-12-31T23:59:59.000Z

    The paper discusses the need to study the criteria for the design and installation of electrical power systems in buildings subject to seismic hazard. Nowadays, all the recommended seismic requirements (according to: Uniform Building Code UBC, Structural Engineers Association of California SEAOC, National Earthquake Hazards Reduction Program NEHRP) do not specifically take into account the electrical or technological power systems. The paper analyzes the problems an earthquake can cause with regard to the functional reliability and continuity of supply of electrical power systems. Therefore, it proposes design and installation requirements, to be graduated according to building occupancy categories. Basically, the criteria relative to the installation of the electrical equipment are an appropriate extension of those general static ones for nonstructural components. Their consideration is essential for the settlement of the design criteria, which, as far as the configuration and the size of the electrical power system are concerned, aim at limiting the same installation problems. Other general design criteria, aimed as a guarantee for the supply continuity and system reliability, have a particular use in these appliances.

  6. AT&TU-verseVoice Self Installation U-verse TVAT&T

    E-Print Network [OSTI]

    Fisher, Kathleen

    options require the use of a battery backup-up unit which is supplied in the kit. Please refer to the battery backup-up information on our website for additional details. Please do not attempt installation box. · Go outside and find your phone box (usually a gray/tan/black box on the side of the house

  7. Pictorial Descriptions of Traffic Sensor Deployments in Honolulu RTMS installation to monitor the out-bound

    E-Print Network [OSTI]

    Prevedouros, Panos D.

    truth counts (bottom right). Two batteries in parallel for the RTMS and one for the SAS were housed and Transportation Laboratory. #12;2 ORADS portable laser sensor installed parallel to the travel lanes along out inside the generator housing. Also shown in the picture above are the memory units for the RTMS

  8. Benefits of Stochastic Scheduling for Power Systems with Significant Installed Wind Power

    E-Print Network [OSTI]

    Benefits of Stochastic Scheduling for Power Systems with Significant Installed Wind Power Aidan Abstract-- Wind energy on a power system alters the unit commitment and dispatch problem, as it adds generation, Power system eco- nomics, Power generation dispatch, Unit Commitment, Wind Forecasting. I

  9. A Reference-Frame for Installing the Student's Computer to Access a Virtual Medicine University

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    the setup - system and the reference-frame. Services concerning the management of the student' computer management (especially confidential issues), its installation and its testing have been enlightened. Those. De plus, ce référentiel est trčs utile pour un administrateur de site universitaire ou hospitalier

  10. EVALUATION OF A PROTOTYPE SOLAR AWNING A prototype solar awning has been designed and installed on

    E-Print Network [OSTI]

    Oregon, University of

    and installed on a University of Oregon campus building. The solar awning is composed of a light shelf across the university system. A kiosk in the hallway turns the system into a solar awning lab where Increase the competitiveness of the university system's renewable energy curriculum Increase the value

  11. Volume XIX, No. 5 A publication of the U.S. Army Installation Management Command

    E-Print Network [OSTI]

    US Army Corps of Engineers

    : A compact fluorescent light saves energy and money. U.S. Army photo September/October 2007 Vol. XIX, No. 5 ................................................................................................... 20 Energy and water campaign plan charts way forward, by Curt Wexel 20-21 Initiative 1 ­ Energy waste/October 2007 U.S. Army Installation Management Command In this issue: Energy and Water Conservation

  12. Modeling applied to problem solving

    E-Print Network [OSTI]

    Pawl, Andrew

    We describe a modeling approach to help students learn expert problem solving. Models are used to present and hierarchically organize the syllabus content and apply it to problem solving, but students do not develop and ...

  13. IIT SCHOOL OF APPLIED TECHNOLOGY

    E-Print Network [OSTI]

    Heller, Barbara

    INDUSTRIAL TECHNOLOGY AND MANAGEMENT IIT SCHOOL OF APPLIED TECHNOLOGY PREPARING SKILLED INDIVIDUALS, INDUSTRIAL FACILITIES, SUPPLY CHAIN MANAGEMENT, SUSTAINABILITY AND MANUFACTURING TECHNOLOGY. #12;BE ONE to assess, implement, and utilize current technologies, and to learn how to manage industrial operations

  14. Sustainable FACULTY OF APPLIED SCIENCE

    E-Print Network [OSTI]

    Michelson, David G.

    Working Together Towards a Sustainable Energy Future FACULTY OF APPLIED SCIENCE Clean Energy aspects of sustainable energy solutions, and is committed to using its extensive expertise to serve, Electrical & Computer, Materials, Mechanical, Mining), the School of Architecture & Landscape Architecture

  15. Radiological Survey of Contaminated Installations of Research Reactor before Dismantling in High Dose Conditions with Complex for Remote Measurements of Radioactivity - 12069

    SciTech Connect (OSTI)

    Danilovich, Alexey; Ivanov, Oleg; Lemus, Alexey; Smirnov, Sergey; Stepanov, Vyacheslav; Volkovich, Anatoly [National Research Centre 'Kurchatov Institute', Moscow (Russian Federation)

    2012-07-01T23:59:59.000Z

    Decontamination and decommissioning of the research reactors MR (Testing Reactor) and RFT (Reactor of Physics and Technology) has recently been initiated in the National Research Center (NRC) 'Kurchatov institute', Moscow. These research reactors have a long history and many installations - nine loop facilities for experiments with different kinds of fuel. When decommissioning nuclear facilities it is necessary to measure the distribution of radioactive contamination in the rooms and at the equipment at high levels of background radiation. At 'Kurchatov Institute' some special remote control measuring systems were developed and they are applied during dismantling of the reactors MR and RFT. For a survey of high-level objects a radiometric system mounted on the robotic Brokk vehicle is used. This system has two (4? and collimated) dose meters and a high resolution video camera. Maximum measured dose rate for this system is ?8.5 Sv/h. To determine the composition of contaminants, a portable spectrometric system is used. It is a remotely controlled, collimated detector for scanning the distribution of radioactive contamination. To obtain a detailed distribution of contamination a remote-controlled gamma camera is applied. For work at highly contaminated premises with non-uniform background radiation, another camera is equipped with rotating coded mask (coded aperture imaging). As a result, a new system of instruments for remote radioactivity measurements with wide range of sensitivity and angular resolution was developed. The experience and results of measurements in different areas of the reactor and at its loop installations, with emphasis on the radioactive survey of highly-contaminated samples, are presented. These activities are conducted under the Federal Program for Nuclear and Radiation Safety of Russia. Adaptation of complex remote measurements of radioactivity and survey of contaminated installations of research reactor before dismantling in high dose conditions has proven successful. The radioactivity measuring devices for operation at high, non-uniform dose background were tested in the field and a new data of measurement of contamination distribution in the premises and installations were obtained. (authors)

  16. Dismantling of Highly Contaminated Process Installations of the German Reprocessing Facility (WAK) - Status of New Remote Handling Technology - 13287

    SciTech Connect (OSTI)

    Dux, Joachim; Friedrich, Daniel; Lutz, Werner; Ripholz, Martina [WAK Rueckbau- und Entsorgungs- GmbH, P.O. Box 12 63, 76339 Eggenstein-Leopoldshafen (Germany)] [WAK Rueckbau- und Entsorgungs- GmbH, P.O. Box 12 63, 76339 Eggenstein-Leopoldshafen (Germany)

    2013-07-01T23:59:59.000Z

    Decommissioning and dismantling of the former German Pilot Reprocessing Plant Karlsruhe (WAK) including the Vitrification Facility (VEK) is being executed in different Project steps related to the reprocessing, HLLW storage and vitrification complexes /1/. While inside the reprocessing building the total inventory of process equipment has already been dismantled and disposed of, the HLLW storage and vitrification complex has been placed out of operation since vitrification and tank rinsing procedures where finalized in year 2010. This paper describes the progress made in dismantling of the shielded boxes of the highly contaminated laboratory as a precondition to get access to the hot cells of the HLLW storage. The major challenges of the dismantling of this laboratory were the high dose rates up to 700 mSv/h and the locking technology for the removal of the hot cell installations. In parallel extensive prototype testing of different carrier systems and power manipulators to be applied to dismantle the HLLW-tanks and other hot cell equipment is ongoing. First experiences with the new manipulator carrier system and a new master slave manipulator with force reflection will be reported. (authors)

  17. Rocky Flats CAAS System Recalibrated, Retested, and Analyzed to Install in the Criticality Experiments Facility at the Nevada Test Site

    SciTech Connect (OSTI)

    Kim, S; Heinrichs, D; Biswas, D; Huang, S; Dulik, G; Scorby, J; Boussoufi, M; Liu, B; Wilson, R

    2009-05-27T23:59:59.000Z

    Neutron detectors and control panels transferred from the Rocky Flats Plant (RFP) were recalibrated and retested for redeployment to the CEF. Testing and calibration were successful with no failure to any equipment. Detector sensitivity was tested at a TRIGA reactor, and the response to thermal neutron flux was satisfactory. MCNP calculated minimum fission yield ({approx} 2 x 10{sup 15} fissions) was applied to determine the thermal flux at selected detector positions at the CEF. Thermal flux levels were greater than 6.39 x 10{sup 6} (n/cm{sup 2}-sec), which was about four orders of magnitude greater than the minimum alarm flux. Calculations of detector survivable distances indicate that, to be out of lethal area, a detector needs to be placed greater than 15 ft away from a maximum credible source. MCNP calculated flux/dose results were independently verified by COG. CAAS calibration and the testing confirmed that the RFP CAAS system is performing its functions as expected. New criteria for the CAAS detector placement and 12-rad zone boundaries at the CEF are established. All of the CAAS related documents and hardware have been transferred from LLNL to NSTec for installation at the CEF high bay areas.

  18. CX-009420: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Additive Manufacturing Using EOSINT M280 CX(s) Applied: None applied. Date: 10/30/2012 Location(s): Missouri Offices(s): Kansas City Site Office

  19. CX-009418: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Electron Beam Melting CX(s) Applied: None applied. Date: 10/30/2012 Location(s): Missouri Offices(s): Kansas City Site Office

  20. CX-010574: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Exclusion Determination Applied Materials - Kerf-less Crystaline-Silicon Photovoltaic: Gas to Modules CX(s) Applied: B3.6 Date: 05162013 Location(s): California,...

  1. CX-009419: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Magnetic Pulser CX(s) Applied: None applied. Date: 10/30/2012 Location(s): Missouri Offices(s): Kansas City Site Office

  2. Problem Description:Problem Description: Installing traditional, wired, structural health monitoring netwInstalling traditional, wired, structural health monitoring networks has severeorks has severe physical, hardware, cost, and time limitations.physical

    E-Print Network [OSTI]

    Heaton, Thomas H.

    monitoring netwInstalling traditional, wired, structural health monitoring networks has severeorks has severeProblem Description:Problem Description: Installing traditional, wired, structural health network for assessing pre- and post-event structural state of health. · Rapid deployment for aftershock

  3. INSTALLATION CERTIFICATE CF-6R-MECH-23-HERS Verification of High EER Equipment (Page 1 of 1)

    E-Print Network [OSTI]

    for construction (responsible person). · I certify that the installed features, materials, components to accept responsibility for construction, or an authorized representative of the person responsible of this Installation Certificate shall be posted, or made available with the building permit(s) issued for the building

  4. INSTALLATION CERTIFICATE CF-6R-MECH-28-HERS Low Leakage Air Handler Verification (Page 1 of 1)

    E-Print Network [OSTI]

    for construction (responsible person). · I certify that the installed features, materials, components to accept responsibility for construction, or an authorized representative of the person responsible of this Installation Certificate shall be posted, or made available with the building permit(s) issued for the building

  5. INSTALLATION CERTIFICATE CF-6R-MECH-02 Solar Domestic Hot Water Systems (SDHW) (Page 1 of 1)

    E-Print Network [OSTI]

    for construction (responsible person). · I certify that the installed features, materials, components to accept responsibility for construction, or an authorized representative of the person responsible, signed copy of this Installation Certificate shall be posted, or made available with the building permit

  6. Network-based Root of Trust for Installation Joshua Schiffman, Thomas Moyer, Trent Jaeger and Patrick McDaniel

    E-Print Network [OSTI]

    Yener, Aylin

    Department, Pennsylvania State University Administrators of large data centers often require network be automated for the administrator. The result is that secure network installation, even over an untrustedNetwork-based Root of Trust for Installation Joshua Schiffman, Thomas Moyer, Trent Jaeger

  7. Press-in piling: Ground vibration and noise during pile installation David White*, Tim Finlay**, Malcolm Bolton*** and Grant Bearss****

    E-Print Network [OSTI]

    Bolton, Malcolm

    of press-in piling makes use of hydraulic rams to provide the force necessary to jack pre-formed piles1 Press-in piling: Ground vibration and noise during pile installation David White*, Tim Finlay-suited to the urban environment. The press- in method offers an alternative technique of pile installation, which

  8. Engineering tasl plan for the development, fabrication and installation of rotary mode core sample truck bellows

    SciTech Connect (OSTI)

    BOGER, R.M.

    1999-06-24T23:59:59.000Z

    The Rotary Mode Core Sampling Trucks (RMSCTs) currently use a multi-sectioned bellows between the grapple box and the quill rod to compensate for drill head motion and to provide a path for purge gas. The current bellows, which is detailed on drawing H-2-690059, is expensive to procure, has a lengthy procurement cycle, and is prone to failure. Therefore, a task has been identified to design, fabricate, and install a replacement bellows. This Engineering Task Plan (ETP) is the management plan document for accomplishing the identified tasks. Any changes in scope of the ETP shall require formal direction by the Characterization Engineering manager. This document shall also be considered the work planning document for developmental control per Development Control Requirements (HNF 1999a). This Engineering Task Plan (ETP) is the management plan document for accomplishing the design, fabrication, and installation of a replacement bellows assembly for the Rotary Mode Core Sampling Trucks 3 and 4 (RMCST).

  9. Installation of the first Distributed Energy Storage System (DESS) at American Electric Power (AEP).

    SciTech Connect (OSTI)

    Nourai, Ali (American Electric Power Company, Columbus, OH)

    2007-06-01T23:59:59.000Z

    AEP studied the direct and indirect benefits, strengths, and weaknesses of distributed energy storage systems (DESS) and chose to transform its entire utility grid into a system that achieves optimal integration of both central and distributed energy assets. To that end, AEP installed the first NAS battery-based, energy storage system in North America. After one year of operation and testing, AEP has concluded that, although the initial costs of DESS are greater than conventional power solutions, the net benefits justify the AEP decision to create a grid of DESS with intelligent monitoring, communications, and control, in order to enable the utility grid of the future. This report details the site selection, construction, benefits and lessons learned of the first installation, at Chemical Station in North Charleston, WV.

  10. (Pulsed atmospheric fluidized-bed combustion). [Installation of the pulsed atmospheric fluidized-bed combustion components

    SciTech Connect (OSTI)

    Not Available

    1988-10-01T23:59:59.000Z

    This second Quarterly Technical Progress Report presents the results of work accomplished during the period July 25 through October 30, 1988. The overall objective of the program is the development of a pulsed atmospheric fluidized-bed combustion (PAFBC) technology to burn coal and to provide heat and steam to commercial, institutional, and small industrial applications at a reasonable price in environmentally acceptable manner. Progress during this period accelerated rapidly. The site for the installation of the PAFBC was completed. All of the system components, including the fabrication of the furnace, were also completed. Additional component testing and inspection was also completed. By the end of this period the AFBC was completely assembled and installed at the site adjacent to the MTCI facility and shakedown tests were initiated. 20 figs., 2 tabs.

  11. Biased insert for installing data transmission components in downhole drilling pipe

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Briscoe, Michael A. (Lehi, UT); Garner, Kory K. (Payson, UT); Wilde, Tyson J. (Spanish Fork, UT)

    2007-04-10T23:59:59.000Z

    An apparatus for installing data transmission hardware in downhole tools includes an insert insertable into the box end or pin end of drill tool, such as a section of drill pipe. The insert typically includes a mount portion and a slide portion. A data transmission element is mounted in the slide portion of the insert. A biasing element is installed between the mount portion and the slide portion and is configured to create a bias between the slide portion and the mount portion. This biasing element is configured to compensate for varying tolerances encountered in different types of downhole tools. In selected embodiments, the biasing element is an elastomeric material, a spring, compressed gas, or a combination thereof.

  12. Solar heating and hot water system installed at Shoney's Restaurant, North Little Rock, Arkansas. Final report

    SciTech Connect (OSTI)

    None

    1980-08-01T23:59:59.000Z

    The solar heating system is designed to supply a major portion of the space and water heating requirements for a newly built Shoney's Big Boy Restaurant which was installed with completion occurring in December 1979. The restaurant has a floor space of approximately 4,650 square feet and requires approximately 1500 gallons of hot water daily. The solar energy system consists of 1,428 square feet of Chamberlain flat plate liquid collector subsystem, and a 1500 gallon storage subsystem circulating hot water producing 321 x 10/sup 6/ Btu/yr (specified) building heating and hot water heating. Designer - Energy Solutions, Incorporated. Contractor - Stephens Brothers, Incorporated. This report includes extracts from site files, specification references for solar modifications to existing building heating and hot water systems, drawings installation, operation and maintenance instructions.

  13. Radiation Control Coatings Installed on Federal Buildings at Tyndall Air Force Base

    SciTech Connect (OSTI)

    Kaba, R.L.; Petrie, T.W.

    1999-03-16T23:59:59.000Z

    The technical objectives of this CRADA comprise technology deployment and energy conservation efforts with the radiation control coatings industry and the utility sector. The results of this collaboration include a high-level data reporting, analysis and management system to support the deployment efforts. The technical objectives include successfully install, commission, operate, maintain and document the performance of radiation control coatings on roofs at Tyndall AFB and the Buildings Technology Center at the Oak Ridge National Laboratory; determine the life cycle savings that can be achieved by using radiation control coatings on entire roofs at Tyndall AFB, based on documented installed cost and operating maintenance costs with and without the coatings; determine if any specific improvements are required in the coatings before they can be successfully deployed in the federal sector; determine the most effective way to facilitate the widespread and rapid deployment of radiation control coatings in the federal sector; and clearly define any barriers to deployment.

  14. Broad Overview of Energy Efficiency and Renewable Energy Opportunities for Department of Defense Installations

    SciTech Connect (OSTI)

    Anderson, E.; Antkowiak, M.; Butt, R.; Davis, J.; Dean, J.; Hillesheim, M.; Hotchkiss, E.; Hunsberger, R.; Kandt, A.; Lund, J.; Massey, K.; Robichaud, R.; Stafford, B.; Visser, C.

    2011-08-01T23:59:59.000Z

    The Strategic Environmental Research and Developmental Program (SERDP)/Environmental Security Technology Certification Program (ESTCP) is the Department of Defense?s (DOD) environmental science and technology program focusing on issues related to environment and energy for the military services. The SERDP/ESTCP Office requested that the National Renewable Energy Laboratory (NREL) provide technical assistance with strategic planning by evaluating the potential for several types of renewable energy technologies at DOD installations. NREL was tasked to provide technical expertise and strategic advice for the feasibility of geothermal resources, waste-to-energy technology, photovoltaics (PV), wind, microgrids, and building system technologies on military installations. This technical report is the deliverable for these tasks.

  15. An overview of the sustainability of solid waste management at military installations

    SciTech Connect (OSTI)

    Borglin, S.; Shore, J.; Worden, H.; Jain, R.

    2009-08-15T23:59:59.000Z

    Sustainable municipal solid waste management at military solutions necessitates a combined approach that includes waste reduction, alternative disposal techniques, and increased recycling. Military installations are unique because they often represent large employers in the region in which they are located, thereby making any practices they employ impact overall waste management strategies of the region. Solutions for waste sustainability will be dependent on operational directives and base location, availability of resources such as water and energy, and size of population. Presented in this paper are descriptions of available waste strategies that can be used to support sustainable waste management. Results presented indicate source reduction and recycling to be the most sustainable solutions. However, new waste-to-energy plants and composting have potential to improve on these well proven techniques and allow military installations to achieve sustainable waste management.

  16. Evaluation of Aqua-Ammonia Chiller Technologies and Field Site Installation

    SciTech Connect (OSTI)

    Zaltash, Abdolreza [ORNL

    2007-09-01T23:59:59.000Z

    The Naval Facilities Engineering Service Center (NFESC) has sponsored Oak Ridge National Laboratory (ORNL) to review, select, and evaluate advanced, gas-fired, 5-ton, aqua-ammonia, chiller technologies. The selection criteria was that units have COP values of 0.67 or better at Air-conditioning and Refrigeration Institute (ARI) 95 F outdoor rating conditions, an active refrigerant flow control, and a variable-speed condenser fan. These features are expected to allow these units to operate at higher ambient temperatures (up to the maximum operating temperature of 110 F) with minimal degradation in performance. ORNL evaluated three potential manufacturers of advanced, gas-fired, 5-ton, aqua-ammonia chillers-Robur, Ambian, and Cooling Technologies. Unfortunately, Robur did not meet the COP requirements and Cooling Technologies could not deliver a unit to be tested at the U.S. Department of Energy (DOE)-ORNL environmental chamber testing facility for thermally activated heat pumps. This eliminated these two technologies from further consideration, leaving only the Ambian chillers for evaluation. Two Ambian chillers were evaluated at the DOE-ORNL test facility. Overall these chillers operated well over a wide range of ambient conditions with minimal degradation in performance due to several control strategies used such as a variable speed condenser fan, a modulating burner, and active refrigerant flow control. These Ambian pre-commercial units were selected for installation and field testing at three federal facilities. NFESC worked with ORNL to assist with the site selection for installation and evaluation of these chillers. Two sites (ORNL and Naval Surface Warfare Center [NSWC] Corona) had a single chiller unit installed; and at one site (Naval Amphibious Base [NAB] Little Creek), two 5-ton chillers linked together were installed to provide 10 tons of cooling. A chiller link controller developed under this project was evaluated in the field test at Little Creek.

  17. Summary Article: IEA HPP Annex 36: Quality Installation / Quality Maintenance Sensitivity Studies

    SciTech Connect (OSTI)

    Hourahan, Mr. Glenn [Air Conditioning Contractors of America, Arlington, VA; Domanski, Dr. Piotr [National Institute of Standards and Technology (NIST), Gaithersburg, MD; Baxter, Van D [ORNL

    2015-01-01T23:59:59.000Z

    The outcome from this Annex activity clearly identifies that poorly designed, installed, and/or maintained heat pumps operate inefficiently and waste considerable energy compared to their as-designed potential. Additionally, it is clear that small faults for a given field-observed practice are significant, that some attribute deviations (in various equipment applications and geographical locations) have a larger impact than others, and that multiple faults or deviations have a cumulative impact on heat pump performance.

  18. Annual Radiological Environmental Monitoring Program Report for the Fort St. Vrain Independent Spent Fuel Storage Installation

    SciTech Connect (OSTI)

    Hall, Gregory Graham; Newkirk, Jay Ronald; Borst, Frederick Jon

    2002-02-01T23:59:59.000Z

    This report presents the results of the 2001 Radiological Environmental Monitoring Program conducted in accordance with 10 CFR 72.44 for the Fort St. Vrain Independent Spent Fuel Storage Installation. A description of the facility and the monitoring program is provided. The results of monitoring the predominant radiation exposure pathway, direct and scattered radiation exposure, indicate the facility operation has not contributed to any increase in the estimated maximum potential dose commitment to the general public.

  19. Development of a Web-based Emissions Reduction Calculator for Solar Thermal and Solar Photovoltaic Installations 

    E-Print Network [OSTI]

    Baltazar-Cervantes, J. C.; Gilman, D.; Haberl, J. S.; Culp, C.

    2005-01-01T23:59:59.000Z

    DEVELOPMENT OF A WEB-BASED EMISSIONS REDUCTION CALCULATOR FOR SOLAR THERMAL AND SOLAR PHOTOVOLTAIC INSTALLATIONS Juan-Carlos Baltazar Research Associate Jeff S. Haberl, Ph.D., P.E. Professor/Associate Director Don R. Gilman, P.E. Senior... the potential emission reductions due to the electricity savings from the application of some of the most common solar thermal and solar photovoltaic systems. The methodology to estimate the potential NOx emission reduction integrates legacy analysis tools...

  20. Installation of a Devonian Shale Reservoir Testing Facility and acquisition of reservoir property measurements

    SciTech Connect (OSTI)

    Locke, C.D.; Salamy, S.P.

    1991-09-01T23:59:59.000Z

    In October, a contract was awarded for the Installation of a Devonian Shale Reservoir Testing Facility and Acquisition of Reservoir Property measurements from wells in the Michigan, Illinois, and Appalachian Basins. Geologic and engineering data collected through this project will provide a better understanding of the mechanisms and conditions controlling shale gas production. This report summarizes the results obtained from the various testing procedures used at each wellsite and the activities conducted at the Reservoir Testing Facility.

  1. Installation of a Devonian Shale Reservoir Testing Facility and acquisition of reservoir property measurements. Final report

    SciTech Connect (OSTI)

    Locke, C.D.; Salamy, S.P.

    1991-09-01T23:59:59.000Z

    In October, a contract was awarded for the Installation of a Devonian Shale Reservoir Testing Facility and Acquisition of Reservoir Property measurements from wells in the Michigan, Illinois, and Appalachian Basins. Geologic and engineering data collected through this project will provide a better understanding of the mechanisms and conditions controlling shale gas production. This report summarizes the results obtained from the various testing procedures used at each wellsite and the activities conducted at the Reservoir Testing Facility.

  2. Preliminary assessment report for Grubbs/Kyle Training Center, Smyrna/Rutherford County Regional Airport, Installation 47340, Smyrna, Tennessee. Installation Restoration Program

    SciTech Connect (OSTI)

    Dennis, C.; Stefano, J.

    1993-07-01T23:59:59.000Z

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Tennessee Army National Guard (TNARNG) property near Smyrna, Tennessee. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Grubbs/Kyle Training Center property, the requirement of the Department of Defense Installation Restoration Program.

  3. Journal of Applied Ecology 2006

    E-Print Network [OSTI]

    Thomas, Len

    Journal of Applied Ecology 2006 43, 377­384 © 2006 The Authors. Journal compilation © 2006 British Ecological Society Blackwell Publishing Ltd METHODOLOGICAL INSIGHTS Point transect sampling with traps, Etive House, Beechwood Park, Inverness IV2 3BW, UK Summary 1. The ability to monitor abundance of animal

  4. APPLIED MATHEMATICS AND SCIENTIFIC COMPUTING

    E-Print Network [OSTI]

    Rogina, Mladen

    APPLIED MATHEMATICS AND SCIENTIFIC COMPUTING Brijuni, Croatia June 23{27, 2003. y x Runge's example; Organized by: Department of Mathematics, Unversity of Zagreb, Croatia. Miljenko Maru#20;si#19;c, chairman;simir Veseli#19;c Andro Mikeli#19;c Sponsors: Ministry of Science and Technology, Croatia, CV Sistemi d

  5. Applied Sustainability Political Science 319

    E-Print Network [OSTI]

    Young, Paul Thomas

    1 Applied Sustainability Political Science 319 College of Charleston Spring 2013 Day/Time: TH 1 Address: fisherb@cofc.edu Office: 284 King Street, #206 (Office of Sustainability) Office Hours: by appt sustainability. It will focus on the development of semester-long sustainability projects, from conception

  6. implementing bioenergy applied research & development

    E-Print Network [OSTI]

    Northern British Columbia, University of

    1 A Northern Centre for Renewable Energy implementing bioenergy applied research & development to develop local solutions to these challenges by integrating campus operations, education, and research will help the University meet its current and future energy needs, reduce or eliminate our greenhouse gas

  7. The 110 GHz ECH installation on DII-D: Status and initial experimental results

    SciTech Connect (OSTI)

    Lohr, J.; Callis, R.W.; O`Neill, R.C. [Univ. of Texas, Austin, TX (United States)] [and others

    1997-05-01T23:59:59.000Z

    Two 110 GHz gyrotrons with nominal output power of 1 MW each have been installed on the DIII-D tokamak. The gyrotrons, produced by Gycom and Communications and Power Industries, are connected to the tokamak by windowless evacuated transmission lines using circular corrugated waveguide carrying the HE{sub 11} mode. Initial experiments with the Gycom gyrotron showed good central heating efficiency at the second harmonic resonance with record central electron temperatures for DIII-D in excess of 10 keV achieved. The beam spot in the DIII-D vacuum vessel was well focused, with a diameter of approximately 8 cm, and it could be steered poloidally by a remotely adjustable mirror. The injection was at 19 deg off-perpendicular for current drive and the beams could be modulated for studies of energy transport and power deposition. The system will be described and the initial physics results will be presented. A third gyrotron, also at 110 GHz, will be installed later this year. Progress with this CPI tube will be discussed and future plans for the ECH installation and physics experiments using it will be presented.

  8. Safety basis for the 241-AN-107 mixer pump installation and caustic addition

    SciTech Connect (OSTI)

    Van Vleet, R.J. [Westinghouse Hanford Co., Richland, WA (United States)

    1994-10-05T23:59:59.000Z

    This safety Basis was prepared to determine whether or not the proposed activities of installing a 76 HP jet mixer pump and the addition of approximately 50,000 gallons of 19 M (50:50 wt %) aqueous caustic are within the safety envelope as described by Tank Farms (chapter six of WHC-SD-WM-ISB-001, Rev. 0). The safety basis covers the components, structures and systems for the caustic addition and mixer pump installation. These include: installation of the mixer pump and monitoring equipment; operation of the mixer pump, process monitoring equipment and caustic addition; the pump stand, caustic addition skid, the electrical skid, the video camera system and the two densitometers. Also covered is the removal and decontamination of the mixer pump and process monitoring system. Authority for this safety basis is WHC-IP-0842 (Waste Tank Administration). Section 15.9, Rev. 2 (Unreviewed Safety Questions) of WHC-IP-0842 requires that an evaluation be performed for all physical modifications.

  9. Solar PV Manufacturing Cost Model Group: Installed Solar PV System Prices (Presentation)

    SciTech Connect (OSTI)

    Goodrich, A. C.; Woodhouse, M.; James, T.

    2011-02-01T23:59:59.000Z

    EERE's Solar Energy Technologies Program is charged with leading the Secretary's SunShot Initiative to reduce the cost of electricity from solar by 75% to be cost competitive with conventional energy sources without subsidy by the end of the decade. As part of this Initiative, the program has funded the National Renewable Energy Laboratory (NREL) to develop module manufacturing and solar PV system installation cost models to ensure that the program's cost reduction targets are carefully aligned with current and near term industry costs. The NREL cost analysis team has leveraged the laboratories' extensive experience in the areas of project finance and deployment, as well as industry partnerships, to develop cost models that mirror the project cost analysis tools used by project managers at leading U.S. installers. The cost models are constructed through a "bottoms-up" assessment of each major cost element, beginning with the system's bill of materials, labor requirements (type and hours) by component, site-specific charges, and soft costs. In addition to the relevant engineering, procurement, and construction costs, the models also consider all relevant costs to an installer, including labor burdens and overhead rates, supply chain costs, and overhead and materials inventory costs, and assume market-specific profits.

  10. Construction and installation of low-cost energy-conservation devices on existing residential structures. Final report

    SciTech Connect (OSTI)

    None

    1983-01-01T23:59:59.000Z

    Through the Neighborhood Housing Services, Incorporated of Charlotte, a series of hands-on workshops and a demonstration site was provided to enable residents of the Plaza-Midwood Neighborhood to build and install a variety of low-cost, durable, small scale, energy conservation systems. This experimental approach enabled homeowners to apply specific technologies to their own homes. These cost effective measures were designed to encourage both self reliance and the use of renewable resources. The weekend projects included protected entry, numerous moveable window insulation devices, solar air collector/greenhouse, window greenhouse and water storage tubes. The building used for retrofit was the office for the Neighborhood Housing Services (NHS), a non-profit corporation formed to help revitalize residential structures and maintain the economic, racial, and social character of existing neighborhoods. The particular neighborhood involved was Plaza-Midwood and covers approximately a 2 square mile area. The neighborhood housing stock is of the 1910 to 1940 variety with the predominate architectual style being bungalow frame, having 1000 to 1900 square feet in area. The neighborhood is a racially integrated one, with about 70% of the residents being homeowners. An estimated 1700 housing units are in this area. The NHS office presently serves as a resource center for area residents who need loans and/or construction assistance. Providing a continuing educational program is a function of this organization. The Grant provided a significant contribution as a resource for energy conservation mined residents. A resource room displaying procedures and diagrams for the various projects in this proposal was established. Additional resource literature was provided and used by local residents.

  11. Development of the Supply Chain Optimization and Planning for the Environment (SCOPE) Tool - Applied to Solar Energy

    E-Print Network [OSTI]

    Reich-Weiser, Corinne; Fletcher, Tristan; Dornfeld, David; Horne, Steve

    2008-01-01T23:59:59.000Z

    Solar Installation Installation (USA) Installation (Germany) Tracker Panel Tracker (China)China, India, the U.S.A, and elsewhere. A single company producing a single solar

  12. Applying to Teacher Education Program at Purdue

    E-Print Network [OSTI]

    David Drasin

    2012-12-02T23:59:59.000Z

    Apply to the Teacher Education Program (TEP). Please remember to apply to the TEP(Gate A) if you wish to officially enroll in the. Professional Education ...

  13. Understanding the EPA guidance on major source determinations for military installations

    SciTech Connect (OSTI)

    Ling, A.D. [Dept. of the Navy, Washington, DC (United States)

    1997-12-31T23:59:59.000Z

    In August 1996, the Environmental Protection Agency (EPA) issued the first ever Clean Air Act (CAA) guidance directed specifically at military facilities. The Guidance, titled Major Source Determinations for Military Installations under the Air Toxics, New Source Review and Title V Operating Permit Programs of the Clean Air Act, was negotiated by an EPA/DoD workgroup that included field and headquarters EPA and DoD representatives, and was led by the Navy. This paper describes the development and contents of the guidance and the significant legal and policy issues raised. By statute and rule, all sources under common control on contiguous or adjacent property and belonging to the same two digit Standard Industrial Classification (SIC) Code must be aggregated when determining if the source is a major source. DoD requested that EPA develop the guidance because of a move by EPA to impose a fenceline-to-fenceline interpretation of what constitutes a major source for purposes of the three programs identified above. Such an interpretation could and did result in more stringent regulation of industrial sources on military installations than of similar industrial plants. The guidance establishes EPA`s allowable interpretation of two of the three key elements of the major source definition. First, the guidance specifies that common control occurs at the military service level; therefore, sources belonging to the Army, Navy, Marine Corps, Air Force, the National Guard or a Defense Agency that are located on the same installation could each be treated separately. Second, the guidance allows the military to assign SIC codes to functional industrial groupings in a manner similar to the private sector. Past practice grouped all national defense activities under the same SIC code.

  14. Effect of gaps on the performance of the vertically installed wet thermal insulator

    SciTech Connect (OSTI)

    Kim, S. H.; Kim, Y. I.; Park, C. T.; Choi, S.; Yoon, J. [Korea Atomic Energy Research Inst., Daeduk-daero 989-111, Yuseong-Gu, Daejeon, 305-353 (Korea, Republic of)

    2012-07-01T23:59:59.000Z

    In SMART, the main flow path of the reactor coolant and the pressurizer partially share common walls in the reactor coolant system. To reduce this heat transfer, the wet thermal insulator (WTI) is installed on the inner wall of the pressurizer. The WTI is constituted of stacked thin stainless steel plates. The water layer width between the plates is chosen to suppress natural convection in each layer. The plates of the WTI require clearance for thermal expansion. When the WTI is installed on a vertical wall, this clearance might cause gaps at the top and bottom at the operating condition. In this study, we focused on the effect of gaps at the both ends on the WTI performance. A numerical simulation was conducted for an 8-layer WTI with gaps at the both ends. To compare with this, a simulation of a WTI without a gap, which is an ideal case, was also conducted. The simulation was conducted in a 2-dimensional manner by a commercial computational fluid dynamics code, FLUENT. The simulations showed that the WTI thermal performance was substantially decreased by a flow that circulated through the top and bottom gaps and water layers at the sides of the WTI. This circulation caused a high temperature difference between the wall and the circulating flow. To find a way to prevent this performance deterioration of the WTI we simulated several cases with the smaller gap heights. However, the flow circulation and the higher heat transfer rate were still observed even at a case with the smallest gap, which seems to be hardly achievable in a real installation. Another way of reducing the flow circulation was suggested and also simulated in this study. (authors)

  15. Tracking the Sun IV: An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010

    E-Print Network [OSTI]

    Darghouth, Naim

    2012-01-01T23:59:59.000Z

    systems, Tracking the Sun IV: The Installed Cost of PhotovoltaicsSystems Tracking the Sun IV: The Installed Cost of Photovoltaicsof Photovoltaics in the U.S. from 1998-2010 Systems with

  16. Redesign of Electrical Installations to Maximize the Use of Photo Voltaic (PV) Cells at the End Use of Consumers in Kuwait 

    E-Print Network [OSTI]

    Alatrash, J.; Mhaisen, N.; Ismail, Z.

    2010-01-01T23:59:59.000Z

    A new idea of redesigning the electrical installations inside residential premises is presented in this paper. The idea is based on having two separate circuits' installations. The first is A.C circuit which can be served ...

  17. Tracking the Sun IV: An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010

    E-Print Network [OSTI]

    Darghouth, Naim

    2012-01-01T23:59:59.000Z

    Efficiency Tracking the Sun IV: The Installed Cost of Photovoltaicsefficiency ratings for ftp://ftp.bls.gov/pub/special.requests/cpi/cpiai.txt Tracking the Sun IV: The Installed Cost of Photovoltaics

  18. Tracking the Sun V: An Historical Summary of the Installed Price of Photovoltaics in the United States from 1998 to 2011

    E-Print Network [OSTI]

    Barbose, Galen

    2014-01-01T23:59:59.000Z

    Building-Integrated Photovoltaics (BIPV) in the ResidentialV: The Installed Price of Photovoltaics in the United StatesV: The Installed Price of Photovoltaics in the United States

  19. Byers Auto Group: A Case Study Into The Economics, Zoning, and Overall Process of Installing Small Wind Turbines at Two Automotive Dealerships in Ohio (Presentation)

    SciTech Connect (OSTI)

    Sinclair, K.; Oteri, F.

    2011-05-01T23:59:59.000Z

    This presentation provides the talking points about a case study on the installation of a $600,000 small wind project, the installation process, estimated annual energy production and percentage of energy needs met by the turbines.

  20. Byers Auto Group: A Case Study Into The Economics, Zoning, and Overall Process of Installing Small Wind Turbines at Two Automotive Dealerships in Ohio

    SciTech Connect (OSTI)

    Oteri, F.; Sinclair, K.

    2011-11-01T23:59:59.000Z

    This paper provides the talking points about a case study on the installation of a $600,000 small wind project, the installation process, estimated annual energy production and percentage of energy needs met by the turbines.

  1. Applied Materials | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia: Energy Resources JumpAnaconda,Anza ElectricInc Jump to:Applied

  2. The Sector Collector of the CMS DT Trigger system: Installation and Performance

    E-Print Network [OSTI]

    Travaglini, R

    2008-01-01T23:59:59.000Z

    Drift Tubes chambers are used for muon detection in the central region of the CMS experiment at LHC. Custom electronics is used for reconstructing muon track segments and for triggering the CMS readout. The trigger Sector Collector modules collect muon segments identified by the on-chamber devices, synchronize the data received from different chambers and convert from LVDS to Optical for transmission to the off-detector electronics. Installation and integration tests were developed for tuning both firmware and hardware of the Sector Collector system: results are reviewed. The system performance during CMS data taking with cosmic rays is discussed.

  3. The Creation of a French Basic Nuclear Installation - Description of the Regulatory Process - 13293

    SciTech Connect (OSTI)

    Mahe, Carole [CEA Marcoule - BP17171 - 30207 Bagnols-Sur-Ceze (France)] [CEA Marcoule - BP17171 - 30207 Bagnols-Sur-Ceze (France); Leroy, Christine [CEA Cadarache - 13108 Saint Paul-Lez-Durance (France)] [CEA Cadarache - 13108 Saint Paul-Lez-Durance (France)

    2013-07-01T23:59:59.000Z

    CEA is a French government-funded technological research organization. It has to build a medium-level waste interim storage facility because the geological repository will not be available until 2025. This interim storage facility, called DIADEM, has to be available in 2017. These wastes are coming from the research facilities for spent fuel reprocessing and the dismantling of the most radioactive parts of nuclear facilities. The CEA handles the waste management by inventorying the needs and updating them regularly. The conception of the facility is mainly based on this inventory. It provides quantity and characteristics of wastes and it gives the production schedule until 2035. Beyond mass and volume, main characteristics of these radioactive wastes are chemical nature, radioisotopes, radioactivity, radiation dose, the heat emitted, corrosive or explosive gas production, etc. These characteristics provide information to study the repository safety. DIADEM mainly consists of a concrete cell, isolated from the outside, wherein stainless steel welded containers are stored, stacked in a vertical position in the racks. DIADEM is scheduled to store three types of 8 mm-thick, stainless steel cylindrical containers with an outside diameter 498 mm and height from 620 to 2120 mm. DIADEM will be a basic nuclear installation (INB in French) because of overall activity of radioactive substances stored. The creation of a French basic nuclear installation is subject to authorization according to the French law No. 2006-686 of 13 June 2006 on Transparency and Security in the Nuclear Field. The authorization takes into account the technical and financial capacities of the licensee which must allow him to conduct his project in compliance with these interests, especially to cover the costs of decommissioning the installation and conduct remediation work, and to monitor and maintain its location site or, for radioactive waste disposal installations, to cover the definitive shut-down, maintenance and surveillance expenditure. The authorization is issued by a decree adopted upon advice of the French Nuclear Safety Authority and after a public enquiry. In accordance with Decree No. 2007-1557 of November 2, 2007, the application is filed with the ministries responsible for nuclear safety and the Nuclear Safety Authority. It consists of twelve files and four records information. The favorable opinion of the Nuclear Safety Authority on the folder is required to start the public inquiry. Once the public inquiry is completed, the building permit is issued by the prefect. (authors)

  4. Texas LoanSTAR Monitoring and Analysis Program: Monitoring Equipment Installation Manual (October 1994)

    E-Print Network [OSTI]

    Bohmer, C.; Lippman, R.; McBride, J.; Casebolt, C.

    1994-01-01T23:59:59.000Z

    by which the apparent power (amperes times volts) must be adjusted to obtain real power. Power in any single-phase or 3 phase 4 wire (3$-$W) system is equal to the sum of the power in the individual phases. The formula below is used to calculate power... the RTD output, reads the resistance which increases linearly with temperature, and calculates the temperature. For installations with long sensor lead lengths, the resistance of signal wire should be determined, and the DAS input channel must be offset...

  5. Installation, Operation, and Maintenance Strategies to Reduce the Cost of Offshore Wind Energy

    SciTech Connect (OSTI)

    Maples, B.; Saur, G.; Hand, M.; van de Pieterman, R.; Obdam, T.

    2013-07-01T23:59:59.000Z

    Currently, installation, operation, and maintenance (IO&M) costs contribute approximately 30% to the LCOE of offshore wind plants. To reduce LCOE while ensuring safety, this paper identifies principal cost drivers associated with IO&M and quantifies their impacts on LCOE. The paper identifies technology improvement opportunities and provides a basis for evaluating innovative engineering and scientific concepts developed subsequently to the study. Through the completion of a case study, an optimum IO&M strategy for a hypothetical offshore wind project is identified.

  6. Measurement-Based Evaluation of Installed Filtration System Performance in Single-Family Homes

    SciTech Connect (OSTI)

    Chan, Wanyu Rengie; Singer, Brett C.

    2014-04-03T23:59:59.000Z

    This guide discusses important study design issues to consider when conducting an on-site evaluation of filtration system performance. The two most important dichotomies to consider in developing a study protocol are (1) whether systems are being evaluated in occupied or unoccupied homes and (2) whether different systems are being compared in the same homes or if the comparison is between systems installed in different homes. This document provides perspective and recommendations about a suite of implementation issues including the choice of particle measurement devices, selection of sampling locations, ways to control and/or monitor factors and processes that can impact particle concentrations, and data analysis approaches.

  7. Development and Use of Baseline Monthly Utility Models for Eight Army Installations Around the United States

    E-Print Network [OSTI]

    Reddy, T. A.; Saman, N. F.; Claridge, D. E.; Haberl, J. S.; Turner, W. D.

    1996-01-01T23:59:59.000Z

    3/96-Final Report, p. i ESL-TR-96/03-01 DEVELOPMENT AND USE OF BASELINE MONTHLY UTILITY MODELS FOR EIGHT ARMY INSTALLATIONS AROUND THE UNITED STATES Prepared by: T.A. Reddy, N.F. Saman, D.E. Claridge, J.S. Haberl and W.D. Turner Research Sponsored... and Scope 2 2.1 Objectives 2 2.2 Data provided 3 2.3 Scope of study 7 3.0 Mathematical Basis of Regression Models 8 3.1 Pertinent background 8 3.2 Simple regression models using Emodel 9 3.3 Generation of 95% uncertainty bands for individual months 14 3...

  8. Handbook of experiences in the design and installation of solar heating and cooling systems

    SciTech Connect (OSTI)

    Ward, D.S.; Oberoi, H.S.

    1980-07-01T23:59:59.000Z

    A large array of problems encountered are detailed, including design errors, installation mistakes, cases of inadequate durability of materials and unacceptable reliability of components, and wide variations in the performance and operation of different solar systems. Durability, reliability, and design problems are reviewed for solar collector subsystems, heat transfer fluids, thermal storage, passive solar components, piping/ducting, and reliability/operational problems. The following performance topics are covered: criteria for design and performance analysis, domestic hot water systems, passive space heating systems, active space heating systems, space cooling systems, analysis of systems performance, and performance evaluations. (MHR)

  9. Engineering study - installation of new risers in Single-Shell Tanks

    SciTech Connect (OSTI)

    Magruder, W.J.

    1994-08-01T23:59:59.000Z

    A sampling program is being developed to characterize the 149 underground SSTs on the Hanford Site. The sampling effort will require access to the tank interior in a minimum of two locations per tank. Some of the risers suitable for sampling are either unavailable or are not in locations for proper characterization of the tank contents. Additional risers will be required in the SSTs to support the tank characterization sampling program. The purpose of this engineering study is to review alternatives for installation of new riser in the SSTs.

  10. Series 50 propane-fueled Nova bus: Engine development, installation, and field trials

    SciTech Connect (OSTI)

    Smith, B.

    1999-01-01T23:59:59.000Z

    The report describes a project to develop the Detroit Diesel series 50 liquefied propane gas (LPG) heavy-duty engine and to conduct demonstrations of LPG-fuelled buses at selected sites (Halifax Regional Municipality and three sites in the United States). The project included five main elements: Engine development and certification, chassis re-engineering and engine installation, field demonstration, LPG fuel testing, and LPG fuel variability testing. Lessons learned with regard to engine design and other issues are discussed, and recommendations are made for further development and testing.

  11. Safety assessment of discharge chute isolation barrier preparation and installation activities. Revision 3

    SciTech Connect (OSTI)

    Meichle, R.H.

    1994-11-08T23:59:59.000Z

    This revision adds a section addressing impacts of dropping surfacing tool and rack cutter on the basin floor, and corrects typographical errors. The safety assessment is made for the activities for the preparation and installation of the discharge chute isolation barriers. The safety assessment includes a hazard assessment and comparisons of potential accidents/events to those addressed by the current safety basis documentation. No significant hazards were identified. An evaluation against the USQ evaluation questions was made and the determination made that the activities do not represent a USQ. Hazard categorization techniques were used to provide a basis for readiness review classifications.

  12. Preliminary assessment report for Bee Caves Armory (former Nike BG-80 Fire Control Facility), Installation 48055, Austin, Texas. Installation Restoration Program

    SciTech Connect (OSTI)

    Dennis, C.

    1993-08-01T23:59:59.000Z

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard (ARNG) property in Austin, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing, preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining, site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Bee Caves Armory property, the requirements of the Department of Defense Installation Restoration Program. Of concern is the potential for hazardous waste to be present on the property as a result of the former Nike Missile Base operations or in the form of original construction materials. Environmentally sensitive operations associated with the property from that period include (1) underground fuel storage, (2) hazardous materials storage/use, (3) disposal of hazardous waste and (4) release of hazardous waste water.

  13. Composite polymeric film and method for its use in installing a very-thin polymeric film in a device

    DOE Patents [OSTI]

    Duchane, D.V.; Barthell, B.L.

    1982-04-26T23:59:59.000Z

    A composite polymeric film and a method for its use in forming and installing a very thin (< 10 ..mu..m) polymeric film are disclosed. The composite film consists of a thin film layer and a backing layer. The backing layer is soluble in a solvent in which the thin film layer is not soluble. In accordance with the method, the composite film is installed in a device in the same position in which it is sought to finally emplace the thin film. The backing layer is then selectiely dissolved in the solvent to leave the insoluble thin film layer as an unbacked film. The method permits a very thin film to e successfully installed in devices where the fragility of the film would preclude handling and installation by conventional methods.

  14. Measured Energy Savings from Retrofits Installed in Low-Income Housing in a Hot and Humid Climate

    E-Print Network [OSTI]

    Parker, D. S.; Sherwin, J. R.; Floyd, D. B.

    1998-01-01T23:59:59.000Z

    conditioner performance and house tightness. These audits revealed numerous problems, but low-evaporator coil air flow was discovered in all homes. The paper describes the retrofit installation, audit data collected and the impact on measured energy...

  15. Sources of error in chilled and hot water metering at shared sites: differential pressure transmitters and flowmeter installation

    E-Print Network [OSTI]

    Corley, Megan Anne

    1998-01-01T23:59:59.000Z

    . In many of the buildings, the ESL opted to use existing flowmeters and differential pressure transmitters installed by contractors for the University. The purpose of this study is to determine measurement error associated with the differential pressure...

  16. Atlantis 11-32 Report Page 1 Update on Experiments Associated with CORK Subseafloor Observatories installed during IODP

    E-Print Network [OSTI]

    Fisher, Andrew

    ) replacement of data loggers at Holes 1026B, 1301A, and 1301B and installation of a supplemental battery associated with other CORK observatories, microbiological sampling, and in-situ analysis

  17. Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008

    E-Print Network [OSTI]

    Barbose, Galen L

    2010-01-01T23:59:59.000Z

    The Japanese and U.S. cost data shown in Figure 13 are forsystems, while the Germany cost data are for 3-5 kW systems.also summarizes installed cost data obtained through public

  18. UBC Social Ecological Economic Development Studies (SEEDS) Student Report Benefits of Installing Additional Rain Sensors within the UBC Irrigation System

    E-Print Network [OSTI]

    Additional Rain Sensors within the UBC Irrigation System Michael Thiessen, Chelsie Drysdale University of Installing Additional Rain Sensors within the UBC Irrigation System A Business Case Analysis Prepared for: Dr................................................................................................................................................................... 5 DESCRIPTION OF CURRENT UBC IRRIGATION WATER USE

  19. Design, installation and implementation of a Neutron Depth Profiling facility at the Texas A&M Nuclear Science Center

    E-Print Network [OSTI]

    Khalil, Nazir Sabbar

    1989-01-01T23:59:59.000Z

    DESIGN, INSTALLATION AND IMPLEMENTATION OF A NEUTRON DEPTH PROFILING FACILITY AT THE TEXAS A&M NUCLEAR SCIENCE CENTER A Thesis by NAZIR SABBAR KHALIL Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment... of the requirements for the degree of MASTER OF SCIENCE August 1989 Major Subject: Nuclear Engineering DESIGN, INSTALLATION AND IMPLEMENTATION OF A NEUTRON DEPTH PROFILING FACILITY AT THE TEXAS A(IM NUCLEAR SCIENCE CENTER A Thesis by NAZIR SABBAR KHALIL...

  20. INSTALLATION OF BUBBLERS IN THE SAVANNAH RIVER SITED DEFENSE WASTE PROCESSING FACILITY MELTER

    SciTech Connect (OSTI)

    Smith, M.; Iverson, D.

    2010-12-08T23:59:59.000Z

    Savannah River Remediation (SRR) LLC assumed the liquid waste contract at the Savannah River Site (SRS) in the summer of 2009. The main contractual agreement was to close 22 High Level Waste (HLW) tanks in eight years. To achieve this aggressive commitment, faster waste processing throughout the SRS liquid waste facilities will be required. Part of the approach to achieve faster waste processing is to increase the canister production rate of the Defense Waste Processing Facility (DWPF) from approximately 200 canisters filled with radioactive waste glass per year to 400 canisters per year. To reach this rate for melter throughput, four bubblers were installed in the DWPF Melter in the late summer of 2010. This effort required collaboration between SRR, SRR critical subcontractor EnergySolutions, and Savannah River Nuclear Solutions, including the Savannah River National Laboratory (SRNL). The tasks included design and fabrication of the bubblers and related equipment, testing of the bubblers for various technical issues, the actual installation of the bubblers and related equipment, and the initial successful operation of the bubblers in the DWPF Melter.