Powered by Deep Web Technologies
Note: This page contains sample records for the topic "installation problems bullet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Survey of Gas Decontamination Problems at Installations of the Atomic Energy Commission  

SciTech Connect

A survey has been made of gas decontamination problems at the various installations of the Atomic Energy Commission and the results are reported. Installations visited include: The Hanford Engineer Works, Brookhaven National Laboratory, Argonne National Laboratory, Los Alamos Scientific Laboratory, Iowa State College Institute for Nuclear Research, Knolls Laboratory, and installations at Oak Ridge.

Lyon, A.M.

1948-06-03T23:59:59.000Z

2

CLOTHING PROBLEMS POSED BY THE OPERATION OF RADIOACTIVE INSTALLATIONS AND THEIR SOLUTIONS  

SciTech Connect

The various methods used for preventing the contamination of the work clothes of persons in radioactive installations are discussed. The problems connected with the clothing and its decontamination and laundering in large nuclear energy plants are considered in some detail, The German countercurrent method (Sulzman system) permits the rapid washing of clothes and produces very little liquid wastes. Dry cleaning is a possible future economic tech nique. The Marcoule laundry installation is described as an example. (tr-auth)

Rodier, J.; Bouzigues, H.; Boutot, P.

1962-01-01T23:59:59.000Z

3

The Silver Bullet: Storage!  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Philly High X-prize PHEV The Silver Bullet... Storage! Terry Boston President & CEO PJM Interconnection July 12, 2011 PJM©2011 2 United States PJM Eastern Interconnection PJM as Part of the Eastern Interconnection KEY STATISTICS PJM member companies 700+ millions of people served 58 peak load in megawatts 158,448 MWs of generating capacity 180,400 miles of transmission lines 61,200 GWh of annual energy 794,335 generation sources 1,365 square miles of territory 211,000 area served 13 states + DC Internal/external tie lines 142 * 24% of generation in Eastern Interconnection * 27% of load in Eastern Interconnection * 19% of transmission assets in Eastern Interconnection 20% of U.S. GDP produced in PJM www.pjm.com As of 6/1/2011 PJM©2011 3 43,623 0 5,000 10,000 15,000

4

The silver bullet myth of sustainable energy savings  

Science Conference Proceedings (OSTI)

Especially in the U.S., people like to think that solving problems just requires finding the proper ''silver bullet.'' Such fixes are not sustainable. Any utility company wanting sustainable long-term savings in personal energy demand requires a more thorough commitment that might be referred to as ''head'' (education), ''heart'' (motivation), and ''hands'' (action). (author)

Pasqualetti, Martin J.; Tabbert, Michael K.; Boscamp, Robert L.

2010-10-15T23:59:59.000Z

5

NIST Bullet Tests Make Frangibles More Tangible  

Science Conference Proceedings (OSTI)

... Initial research to assess this risk focused on ballistic penetration tests. ... The test samples are small slices from frangible bullets that are sandwiched ...

2013-03-13T23:59:59.000Z

6

Frozen Bullets Tame Unruly Edge Plasmas in Fusion Experiment...  

NLE Websites -- All DOE Office Websites (Extended Search)

Frozen Bullets Tame Unruly Edge Plasmas in Fusion Experiment American Fusion News Category: General Atomics (GA) Link: Frozen Bullets Tame Unruly Edge Plasmas in Fusion Experiment...

7

Scattering Phase Function of Bullet Rosette Ice Crystals  

Science Conference Proceedings (OSTI)

Ice crystals in cirrus frequently exhibit the shape of a bullet rosette composed of multiple bullets that radiate from a junction center. The scattering phase function of these ice crystals, pertinent to the radiation budget of cirrus, may differ ...

Jean Iaquinta; Harumi Isaka; Pascal Personne

1995-05-01T23:59:59.000Z

8

Use of Bullet Traps and Steel Targets  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

USE OF BULLET TRAPS AND USE OF BULLET TRAPS AND STEEL TARGETS U.S. DEPARTMENT OF ENERGY Office of Health, Safety and Security AVAILABLE ONLINE AT: INITIATED BY: http://www.hss.energy.gov Office of Health, Safety and Security Notices This document is intended for the exclusive use of elements of the Department of Energy (DOE), to include the National Nuclear Security Administration, their contractors, and other government agencies/individuals authorized to use DOE facilities. DOE disclaims any and all liability for personal injury or property damage due to use of this document in any context by any organization, group, or individual, other than during official government activities. Local DOE management is responsible for the proper execution of firearms-related programs for

9

Reactions of HS sup sm bullet and S sup sm bullet minus with molecular oxygen, H sub 2 S, HS sup minus , and S sup 2 minus : Formation of SO sub 2 sup sm bullet minus , HSSH sup sm bullet minus , HSS sup sm bullet 2 minus , and HSS sup sm bullet. [Gamma radiation  

SciTech Connect

An electron spin resonance investigation of the reactions of HS{sup {sm bullet}} and S{sup {sm bullet}{minus}} produced from H{sub 2}S, HS{sup {minus}}, and S{sup 2{minus}} in glassy matrices at low temperatures is presented. Co-60 irradiation of 8 M NaClO{sub 4}, 12 M LiCl, and alkali-metal hydroxide glasses at 77 K results in the formation of O{sup {sm bullet}{minus}}, Cl{sub 2}{sup {sm bullet}{minus}}, and e{sup {minus}}. Upon annealing to about 150 K O{sup {sm bullet}{minus}} or Cl{sub 2}{sup {sm bullet}{minus}} reacts with the solutes H{sub 2}S, HS{sup {minus}}, or S{sup 2{minus}} to form HS{sup {sm bullet}} and S{sup {sm bullet}{minus}} radicals. In the presence of molecular oxygen HS{sup {sm bullet}} and S{sup {sm bullet}{minus}} each react to form sulfur dioxide anion radical, SO{sub 2}{sup {sm bullet}{minus}}. {sup 17}O isotopic studies verify the source of the oxygen in SO{sub 2}{sup {sm bullet}{minus}} is the molecular oxygen dissolved in the matrices. In the absence of molecular oxygen, competing processes are clearly observed; i.e., HS{sup {sm bullet}} and S{sup {sm bullet}{minus}} attack H{sub 2}S and HS{sup {minus}} to form dimer radicals HSSH{sup {sm bullet}{minus}} and HSS{sup {sm bullet}2{minus}}. At low pH the authors find that HS{sup {sm bullet}} attacks H{sub 2}S to form HSS{sup {sm bullet}}. Mechanisms for the formation of these species are proposed, and hyperfine couplings and g values are reported. Ab initio molecular orbital calculations are performed to aid their understanding of the electronic structure of the various radical species formed and the energetics of their reactions.

Zhu, J.; Petit, K.; Colson, A.O.; DeBolt, S.; Sevilla, M.D. (Oakland Univ., Rochester, MI (United States))

1991-05-02T23:59:59.000Z

10

NIST Helping Improve Speed Measurements for Cars, Bullets  

Science Conference Proceedings (OSTI)

... of a wheel attached to the rear of the test vehicle instead of ... bulletthat is 20 times more precise than a typical manufacturer-provided chronograph. ...

2011-04-04T23:59:59.000Z

11

Passive infrared bullet detection and tracking  

DOE Patents (OSTI)

An apparatus and method for passively detecting a projectile such as, for example, a bullet using a passive infrared detector. A passive infrared detector is focused onto a region in which a projectile is expected to be located. Successive images of infrared radiation in the region are recorded. Background infrared radiation present in the region is suppressed such that second successive images of infrared radiation generated by the projectile as the projectile passes through the region are produced. A projectile path calculator determines the path and other aspects of the projectile by using the second successive images of infrared radiation generated by the projectile. The present invention, in certain embodiments, also determines the origin of the path of the projectile and takes a photograph of the area surrounding the origin and/or fires at least one projectile at the area surrounding the origin of the path of the projectile.

Karr, T.J.

1994-12-31T23:59:59.000Z

12

Passive infrared bullet detection and tracking  

DOE Patents (OSTI)

An apparatus and method for passively detecting a projectile such as, for example, a bullet using a passive infrared detector. A passive infrared detector is focused onto a region in which a projectile is expected to be located. Successive images of infrared radiation in the region are recorded. Background infrared radiation present in the region is suppressed such that second successive images of infrared radiation generated by the projectile as the projectile passes through the region are produced. A projectile path calculator determines the path and other aspects of the projectile by using the second successive images of infrared radiation generated by the projectile. The present invention, in certain embodiments, also determines the origin of the path of the projectile and takes a photograph of the area surrounding the origin and/or fires at least one projectile at the area surrounding the origin of the path of the projectile. 9 figs.

Karr, T.J.

1997-01-21T23:59:59.000Z

13

Passive infrared bullet detection and tracking  

DOE Patents (OSTI)

An apparatus and method for passively detecting a projectile such as, for example, a bullet using a passive infrared detector. A passive infrared detector is focused onto a region in which a projectile is expected to be located. Successive images of infrared radiation in the region are recorded. Background infrared radiation present in the region is suppressed such that second successive images of infrared radiation generated by the projectile as the projectile passes through the region are produced. A projectile path calculator determines the path and other aspects of the projectile by using the second successive images of infrared radiation generated by the projectile. The present invention, in certain embodiments, also determines the origin of the path of the projectile and takes a photograph of the area surrounding the origin and/or fires at least one projectile at the area surrounding the origin of the path of the projectile.

Karr, Thomas J. (Alamo, CA)

1997-01-01T23:59:59.000Z

14

A method for testing handgun bullets in deer  

E-Print Network (OSTI)

Using service handguns to test bullets in deer is problematic because of velocity loss with range and accuracy giving sub-optimal shot placement. An alternate method is presented using a scoped muzzleloader shooting saboted handgun bullets to allow precise (within 2" in many cases) shot placement for studying terminal ballistics in a living target. Deer are baited to a known range and path obstructions are used to place the deer broadside to the shooter. Muzzleloading powder charges provide a combination of muzzle velocity and velocity loss due to air resistance for a given ballistic coefficient that produce impact velocities corresponding to typical pistol velocities. With readily available sabots, this approach allows for testing of terminal ballistics of .355, .357, .40, .429, .45, and .458 caliber bullets with two muzzleloaders (.45 and .50 caliber). Examples are described demonstrating the usefulness of testing handgun bullets in deer for acoustic shooting event reconstruction, understanding tissue damage effects, and comparing relative incapacitation of different loads.

Michael Courtney; Amy Courtney

2007-02-13T23:59:59.000Z

15

Effect of Cavities on the Optical Properties of Bullet Rosettes: Implications for Active and Passive Remote Sensing of Ice Cloud Properties  

Science Conference Proceedings (OSTI)

Bullet rosette particles are common in ice clouds, and the bullets may often be hollow. Here the single-scattering properties of randomly oriented hollow bullet rosette ice particles are investigated. A bullet, which is an individual branch of a ...

Ping Yang; Zhibo Zhang; George W. Kattawar; Stephen G. Warren; Bryan A. Baum; Hung-Lung Huang; Yong X. Hu; David Winker; Jean Iaquinta

2008-09-01T23:59:59.000Z

16

Use of Bullet Traps and Steel Targets - June 4, 2012 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Use of Bullet Traps and Steel Targets - June 4, 2012 Use of Bullet Traps and Steel Targets - June 4, 2012 June 4, 2012 This supplement contains the currently approved document, Use...

17

Military installations  

Science Conference Proceedings (OSTI)

This report has reviewed the use of U.S. coal at DOD installations in West Germany. DOD reported that between April 1, 1988, and December 31, 1988, it had between 306,000 and 419,000 tons of U.S. coal stored in Germany. About two-thirds of that was anthracite coal. GAO visited six coal-handling locations that accounted for 72 to 79 percent of the total U.S. coal between April and December 1988. This report could not verify the official inventory records at five locations - two Air Force and three Army - for several reasons, including a lack of required physical inventories of coal for recent years. DOD's coal consumption data for fiscal year 1988 appeared to be accurate since it matched the data reported on source documents maintained at the installations and their commands. According to reported DOD coal inventory and consumption data, as of September 30, 1988, DOD had enough anthracite coal on hand to satisfy projected demands through at least fiscal year 1993, given that no additional heating plant conversions other than those already approved occur and no additional shipments of coal occur. DOD said that as of September 30, 1988, it facilities in Germany had enough anthracite coal on hand to last a minimum of five years.

Not Available

1990-03-01T23:59:59.000Z

18

Writing the conclusions: how do bullet-points help?  

Science Conference Proceedings (OSTI)

Different authors in different disciplines conclude their articles in different ways. In this paper we illustrate this statement with examples and suggest that one particular way of clarifying the conclusions of articles in the sciences and social sciences ... Keywords: academic writing, accessing information, bullet points, conclusions, lists

Marcin Kozak; James Hartley

2011-04-01T23:59:59.000Z

19

NIST Net installation instructions  

Science Conference Proceedings (OSTI)

... Xaw3d, and neXtaw; Build and install the nistnet module, API library, and user interface make make install; Try things out ...

2013-09-12T23:59:59.000Z

20

PETSc: Documentation: Installation  

NLE Websites -- All DOE Office Websites (Extended Search)

Installation Home Download Features Documentation Manual pages and Users Manual Citing PETSc Tutorials Installation AMS Changes Bug Reporting Code Management FAQ License Linear...

Note: This page contains sample records for the topic "installation problems bullet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Reduction potential of the sulfhydryl radical: Pulse radiolysis and laser flash photolysis studies of the formation and reactions of {sm_bullet}SH and HSSH{sm_bullet}{sup {minus}} in aqueous solutions  

SciTech Connect

H{sub 2}S, which is a very toxic gas, has a large number of natural and anthropogenic sources, and the safe removal of this substance has been a matter of ongoing industrial concern. Formation and reactions of the {sm_bullet}SH/{sm_bullet}S{sup {minus}} and HSSH{sm_bullet}{sup {minus}}/HSS{sm_bullet}{sup 2{minus}} radicals in aqueous solutions have been studied by excimer laser flash photolysis and by pulse radiolysis. Acidic H{sub 2}S solutions can be photolyzed with 193 nm laser pulses and produce a transient species with {lambda}{sub max} at 240 nm, ascribed to the {sm_bullet}SH/{sm_bullet}S{sup {minus}} radical. Solutions of SH{sup {minus}} can be photolyzed also with 248 nm laser pulses to produce the {sm_bullet}SH/{sm_bullet}S{sup {minus}} reacts with SH{sup {minus}} ({kappa}{sub f} = 4 {times} 10{sup 9} L/mol s, {kappa}{sub r} = 5 {times} 10{sup 5} s{sup {minus}1}) to form HSSH{sm_bullet}{sup {minus}}/HSS{sm_bullet}{sup 2{minus}}, with {lambda}{sub max} at 380 nm. Both {sm_bullet}SH/{sm_bullet}S{sup {minus}} and HSSH{sm_bullet}{sup {minus}}/HSS{sm_bullet}{sup 2{minus}} react rapidly with O{sub 2}; the former produces SO{sub 2}{sm_bullet}{sup {minus}} ({kappa} = 5 {times} 10{sup 9} L/mol s), and the latter produces O{sub 2}{sm_bullet} ({kappa} = 4 {times} 10{sup 8} L/mol s). Both radicals react with olefinic compounds. The monomeric radical oxidizes Fe(CN){sub 6}{sup 4{minus}}, SO{sub 3}{sup 2{minus}}, ClO{sub 2}{sup {minus}}, and chlorpromazine. The dimeric radical is a weaker oxidant toward ferrocyanide but reduces N-methylpyridinium compounds. The reduction potential for the dimeric radical at pH 7 was determined from one-electron transfer equilibria with Mo(CN){sub 8}{sup 3{minus}} and with the 4-methoxyaniline radical cation and found to be 0.69 V vs NHE. From the equilibrium constant K = [HSS{sm_bullet}{sup 2{minus}}]/[SH{sup {minus}}][{sm_bullet}S{sup {minus}}] = 8 {times} 10{sup 3} L/mol, the reduction potential for ({sm_bullet}S{sup {minus}},H{sup +}/SH{sup {minus}}) is calculated to be 0.92 V.

Das, T.N.; Huie, R.E.; Neta, P.; Padmaja, S. [National Inst. of Standards and Technology, Gaithersburg, MD (United States). Physical and Chemical Properties Div.

1999-07-08T23:59:59.000Z

22

Reflectivity software installation  

Science Conference Proceedings (OSTI)

... First download and unpack the reflectometry source tree. You may need to build and install Tcl/Tk, BLT, TkTable, BWidget and TkCon. ...

23

HVAC Installed Performance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HVAC Installed Performance HVAC Installed Performance ESI, Tim Hanes Context * The building envelope has historically been the focus in residential homes. * The largest consumer of energy in residential homes is typically the HVAC system. * Testing the performance of the HVAC system has not been pursued to its full potential. Technical Approach * Currently very little performance testing is being done to the HVAC system. * The only way to know if a HVAC system is operating correctly is to measure the Btu/h. * This should be done at the equipment and at the the system. Recommended Guidance * Training of HVAC technicians, installers, and salespeople is a must. * If only the technician is trained than implementing the change will not happen. * Public awareness of proper installation and its

24

HVAC Installed Performance  

Energy.gov (U.S. Department of Energy (DOE))

This presentation was given at the Summer 2012 DOE Building America meeting on July 25, 2012, and addressed the question HVAC proper installation energy savings: over-promising or under-delivering?"

25

Curating performance installations  

Science Conference Proceedings (OSTI)

In this paper we will examine the use of the digital screen display as a primary form of accessing information within the museum context. We will argue that this mode of dissemination, achieved primarily through a Graphic User Interface (GUI) though ... Keywords: GUI, becoming, being, content, dissemination, exhibition, experience, form, information, installation, interactivity, interpretation, materiality, museum, nothing, objecthood, performance, performative, re-enactment, screen, technology, trajectory

Daniel Felstead; Kate Bailey

2011-07-01T23:59:59.000Z

26

Low pressure turbine installation  

SciTech Connect

Low-pressure turbine installation is described comprising a casing, at least two groups of turbine stages mounted in said casing, each turbine stage having blades so arranged that a flow of steam passes through the respective turbine stages in contraflow manner, partition means in said casing for separating the opposed final stages of said turbine stages from each other, and steam exhausting means opened in the side walls of said casing in a direction substantially perpendicular to the axis of said turbine, said steam exhausting means being connected to condensers.

Iizuka, N.; Hisano, K.; Ninomiya, S.; Otawara, Y.

1976-08-10T23:59:59.000Z

27

Windows Installation Notes for EXPGUI  

Science Conference Proceedings (OSTI)

... These notes describe how GSAS & EXPGUI are installed using separate distribution files for GSAS, EXPGUI and Tcl/Tk. ...

28

HTAR Client Configuration and Installation  

NLE Websites -- All DOE Office Websites (Extended Search)

Configuration and Installation Configuration and Installation HTAR Configuration and Installation HTAR is an archival utility similar to gnu-tar that allows for the archiving and extraction of local files into and out of HPSS. Configuration Instructions This distribution has default configuration settings which will work for most environments. If you want to use the default values (recommended) you can skip to the section labeled INSTALLATION INSTRUCTIONS. In certain environments, for example if your installation is on a machine which has more than one network interface, you may want to change some of these default settings. To help with this, an interactive Configure script is provided. To use it do $ ./Configure prior to installing. Configure will provide a description of the options

29

Guidelines for solar energy installations  

SciTech Connect

Guidelines for solar energy installations are presented. The guideline is published in code form so that it can be used directly as the text of an ordinance to regulate the installation of solar systems. An index contains cross references to sections of existing model codes that are applicable to solar installations. Wind energy systems, passive solar space conditioning systems, photovoltaic systems, and systems involving mechanical compression of refrigerants are not included.

1984-01-01T23:59:59.000Z

30

ASHRAE Installs New Officers, Directors DENVER ASHRAE has installed  

E-Print Network (OSTI)

ASHRAE Installs New Officers, Directors DENVER ­ ASHRAE has installed new officers and directors for 2013-14 at its Annual Meeting held here June 22-26. The ASHRAE Presidential Address is viewable on You is William P. "Bill" Bahnfleth, Ph.D., P.E., Fellow ASHRAE, ASME Fellow, a professor of Architectural

Maroncelli, Mark

31

Task analysis for solar installers  

SciTech Connect

The process focused on the sequential identification and field validation of the tasks actually performed. This method provides an accurate picture of what happens on the roof. Forty-six solar firms were identified as the population; 29 (63%) participated in the validation project. We identified 8 duty areas and 46 tasks. The overall response rate for the occupational task list is 100% except for tasks under the duty of constructing solar collectors. Only eight of the twenty-nine respondents (28%) indicated that solar installers fabricate collectors. This shows that solar installers do not manufacture collectors and only perform tasks directly related to installation. Additional findings from our study indicate that instructional materials designed for solar installers need to be standardized and made task-specific. The tasks identified in this research should form the foundation for a competency-based curriculum for solar water heater installers.

Harrison, J.; LaHart, D.

1982-01-01T23:59:59.000Z

32

WebCAT: Installation Instructions for Windows  

Science Conference Proceedings (OSTI)

... WebCAT. Note: Windows ME does not ship with a webserver; Apache can be installed. Download and Install, Download ...

33

Computational atmospheric trajectory simulation analysis of spin-stabilised projectiles and small bullets  

Science Conference Proceedings (OSTI)

A mathematical model is based on the full equations of motion set up in the no-roll body reference frame and is integrated numerically from given initial conditions at the firing site. The computational flight analysis takes into consideration the ... Keywords: Coriolis effect, Mach number, Magnus effect, aerodynamic jump, atmospheric trajectory, constant aerodynamic coefficients, equations of motion, flight analysis, flight trajectories, gyroscopic stability, no-roll body reference frame, simulation, small bullets, spin-stabilised projectiles, static stability, total angle of attack, variable aerodynamic coefficients

D. N. Gkritzapis; E. E. Panagiotopoulos; D. P. Margaris; D. G. Papanikas

2008-07-01T23:59:59.000Z

34

Net Zero Energy Installations (Presentation)  

SciTech Connect

A net zero energy installation (NZEI) is one that produces as much energy from on-site renewable sources as it consumes. NZEI assessment provides a systematic approach to energy projects.

Booth, S.

2012-05-01T23:59:59.000Z

35

Solar Installation Labor Market Analysis  

DOE Green Energy (OSTI)

The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

Friedman, B.; Jordan, P.; Carrese, J.

2011-12-01T23:59:59.000Z

36

Impacts of a Supersonic Shock Front on Star Formation in the Bullet Cluster  

E-Print Network (OSTI)

We use the Bullet Cluster (1E0657-56) to investigate the extent to which star formation in cluster galaxies is influenced by ram pressure from supersonic gas (Mach 3) during a cluster merger. While the effects of ram pressure have been studied for individual galaxies infalling into galaxy clusters, this system provides a unique opportunity to investigate the impact of dramatic merger events on the cluster galaxy population. In this analysis we use {\\it Spitzer} IRAC data to study star formation. At the redshift of the cluster the 6.2 $\\mu$m PAH feature is redshifted into the 8 $\\mu$m band, enabling use of the m$_{4.5}$-m$_{8}$ color as a proxy for specific star formation rate. We find that the color distribution on the two sides of the shock differ by less than 2$\\sigma$, and conclude that ram pressure from the shock front has no dramatic, immediate impact on the star formation of cluster galaxies in the Bullet Cluster.

Sun Mi Chung; Anthony H. Gonzalez; Douglas Clowe; Dennis Zaritsky; Maxim Markevitch; Christine Jones

2008-10-07T23:59:59.000Z

37

Impacts of a Supersonic Shock Front on Star Formation in the Bullet Cluster  

E-Print Network (OSTI)

We use the Bullet Cluster (1E0657-56) to investigate the extent to which star formation in cluster galaxies is influenced by ram pressure from supersonic gas (Mach 3) during a cluster merger. While the effects of ram pressure have been studied for individual galaxies infalling into galaxy clusters, this system provides a unique opportunity to investigate the impact of dramatic merger events on the cluster galaxy population. In this analysis we use {\\it Spitzer} IRAC data to study star formation. At the redshift of the cluster the 6.2 $\\mu$m PAH feature is redshifted into the 8 $\\mu$m band, enabling use of the m$_{4.5}$-m$_{8}$ color as a proxy for specific star formation rate. We find that the color distribution on the two sides of the shock differ by less than 2$\\sigma$, and conclude that ram pressure from the shock front has no dramatic, immediate impact on the star formation of cluster galaxies in the Bullet Cluster.

Chung, Sun Mi; Clowe, Douglas; Zaritsky, Dennis; Markevitch, Maxim; Jones, Christine

2008-01-01T23:59:59.000Z

38

V-053: Adobe Shockwave player installs Xtras without prompting | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Adobe Shockwave player installs Xtras without prompting 3: Adobe Shockwave player installs Xtras without prompting V-053: Adobe Shockwave player installs Xtras without prompting December 24, 2012 - 12:15am Addthis PROBLEM: Adobe Shockwave player installs Xtras without prompting PLATFORM: Adobe Shockwave Player ABSTRACT: A vulnerability was reported in Adobe Shockwave. REFERENCE LINKS: Vulnerability Note VU#519137 SecurityTracker Alert ID: 1027903 Bugtraq ID: 56972 CVE-2012-6271 IMPACT ASSESSMENT: Medium DISCUSSION: Adobe Shockwave Player through 11.6.8.638 allows remote attackers to trigger installation of arbitrary signed Xtras via a Shockwave movie that contains an Xtra URL, as demonstrated by a URL for an outdated Xtra. IMPACT: By convincing a user to view a specially crafted Shockwave content, an attacker may be able to execute arbitrary code with the privileges of the

39

Gas main installed under a major four-lane highway  

SciTech Connect

This paper discusses the design and installation of a natural gas pipeline in Richmond, British Columbia. Because of problems with existing utility lines, pressure requirements, safety concerns, socio-economic interests, it was decided that the only alternative was down the center-line of the highway. The paper reviews the geologic site conditions which favored directional drilling operations along with the actual drilling equipment involved. It reviews the problems encountered and how such problems were overcome.

Tremblay, G.R. (BC Gas Utility Ltd., Burnaby, British Columbia (Canada))

1994-06-01T23:59:59.000Z

40

Solar Installation Labor Market Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

Installation Labor Installation Labor Market Analysis Barry Friedman National Renewable Energy Laboratory Philip Jordan Green LMI Consulting John Carrese San Francisco Bay Area Center of Excellence Technical Report NREL/TP-6A20-49339 December 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Solar Installation Labor Market Analysis Barry Friedman National Renewable Energy Laboratory Philip Jordan Green LMI Consulting John Carrese San Francisco Bay Area Center of Excellence

Note: This page contains sample records for the topic "installation problems bullet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

installed capacity | OpenEI  

Open Energy Info (EERE)

installed capacity installed capacity Dataset Summary Description Estimates for each of the 50 states and the entire United States show Source Wind Powering America Date Released February 04th, 2010 (4 years ago) Date Updated April 13th, 2011 (3 years ago) Keywords annual generation installed capacity usa wind Data application/vnd.ms-excel icon Wind potential data (xls, 102.4 KiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period License License Other or unspecified, see optional comment below Comment Work of the U.S. Federal Government. Rate this dataset Usefulness of the metadata Average vote Your vote Usefulness of the dataset Average vote Your vote Ease of access Average vote Your vote Overall rating Average vote Your vote Comments

42

Cray to Install Cascade System at NERSC  

NLE Websites -- All DOE Office Websites (Extended Search)

Cray to Install Cascade System at NERSC Cray to Install Cascade System at NERSC June 27, 2012 by Richard Gerber (0 Comments) Cray will install a next-generation supercomputer...

43

Installation and Commissioning Automated Demand Response Systems  

E-Print Network (OSTI)

al: Installation and Commissioning Automated Demand ResponseConference on Building Commissioning: April 22 24, 2008al: Installation and Commissioning Automated Demand Response

Kiliccote, Sila; Global Energy Partners; Pacific Gas and Electric Company

2008-01-01T23:59:59.000Z

44

Brand Font Installation Guide Windows XP  

E-Print Network (OSTI)

Brand Font Installation Guide Windows XP Before starting ­ make sure to the specific font folder ­ when Windows detects installable font files, they will show

Stuart, Steven J.

45

Generator Bushing Installation and Maintenance Guide  

Science Conference Proceedings (OSTI)

This report is a comprehensive guide to generator high-voltage bushing (HVB) installation and maintenance.

2008-12-04T23:59:59.000Z

46

Process Improvement at Army Installations  

E-Print Network (OSTI)

Compliance with environmental law is becoming significantly expensive. In the past for convenience of management, compliance and pollution prevention were considered independently from production. Environmental law was introduced to optimize production methods to reduce pollution. Energy conservation opportunities (ECOs) that enhance pollution prevention have been compiled through research at many installations, including United States Army Construction Engineering Research Laboratories (USACERL). Executive Orders require the Army to reduce the use of energy and related environmental impacts by promoting renewable energy technologies. These new energy and environmental directives usually exceed the performance capabilities of DODs currently installed industrial technologies. The majority of DOD industrial activities utilize 40 year-old technologies and facilities. The objective of this project was to conduct a Level II process optimization audit on a munitions manufacturing operation at an Army base to optimize capacity, and energy and environmental performance. This paper reports the outcome and offers insights into process optimization.

Northrup, J.; Smith, E. D.; Lin, M.; Baird, J.

1997-04-01T23:59:59.000Z

47

SunShot Initiative: Installation and Performance  

NLE Websites -- All DOE Office Websites (Extended Search)

Installation and Performance to Installation and Performance to someone by E-mail Share SunShot Initiative: Installation and Performance on Facebook Tweet about SunShot Initiative: Installation and Performance on Twitter Bookmark SunShot Initiative: Installation and Performance on Google Bookmark SunShot Initiative: Installation and Performance on Delicious Rank SunShot Initiative: Installation and Performance on Digg Find More places to share SunShot Initiative: Installation and Performance on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Balance of Systems Reducing Non-Hardware Costs Lowering Barriers Fostering Growth Installation and Performance Photo of a group of men moving a rectangular solar panel. Energy Secretary Steven Chu watches members of the Solar Instructor

48

AIR LEAKAGE OF NEWLY INSTALLED RESIDENTIAL WINDOWS  

E-Print Network (OSTI)

Through Sash/Frame Cracks . Window Operation Types . . . . .Window Operation Types . . . . .Air Leakage of Installed Windows Scattergram of Field

Weidt, John

2013-01-01T23:59:59.000Z

49

Environmental Assessment Kotzebue Wind Installation Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment \ Kotzebue Wind Installation Project Kotzebue, Alaska U. S. Department of Energy Golden Field Office 16 17 Cole Boulevard Golden, Colorado May 1998 Environmental Assessment Kotzebue Wind Installation Project Kotzebue, Alaska U. S . Department of Energy Golden Field Office 1617 Cole Boulevard Golden, Colorado May 1998 Finding of No Significant Impact Environmental Assessment Kotzebue Wind Installation Project Kotzebue, Alaska F'INDING OF NO SIGNIFICANT IMPACT for KOTZEBUE WIND INSTALLATION PROJECT KOTZEBUE, ALASKA AGENCY: Department of Energy, Golden Field Office ACTION: Finding of No Significant Impact SUMMARY: The DOE is proposing to provide financial .assistance to the Kotzebue Electric Association to expand its existing wind installation near Kotzebue, Alaska.

50

1980 Active-Solar Installations Survey  

SciTech Connect

The survey covers active solar installations made during and prior to calendar year 1980. As the first survey of active solar installations in the United States, the objective was to establish a national baseline information system that could provide current data on residential and commercial active solar installations as well as a listing of firms involved in the active solar industry, including installers. Potential respondents were identified from regional lists of solar equipment dealers and installers compiled by each Regional Solar Energy Center (RSEC). The RSEC lists were computerized and combined into a mailing list of 5466 company names and addresses. An additional 1619 referrals, were provided by survey respondents from the RSEC list. However, because of resource constraints, 981 of these referrals were not included in the survey. To substantiate that the results of this survey represent accurate statistics on the number of active solar installations in the United States, a comparison was made to the Solar Collector Manufacturing Survey installations. (PSB)

1982-10-01T23:59:59.000Z

51

Departments of Energy, Defense Partner to Install Fuel Cell Backup...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at...

52

FLUDViz: Installation Instructions for UNIX Source  

Science Conference Proceedings (OSTI)

... details. launches a Tcl/Tk process for the control menu. Thus you need a Tcl/Tk implementation installed on your system. ...

53

Lightning and Surge Protection of Photovoltaic Installations  

Science Conference Proceedings (OSTI)

... installed at the site, for safety, surge protection ... the cells were described as "melted near the metallic ... horizontal distance from the nearest air terminal ...

2013-05-17T23:59:59.000Z

54

WebCAT: Installation Instructions for Windows  

Science Conference Proceedings (OSTI)

... Requirements, WebCAT can be installed on Windows systems running IIS, PWS, or Apache web servers and on Unix systems running Apache. ...

55

NREL: Technology Transfer - Wind Technology Center Installing ...  

Wind Technology Center Installing a Dynamic Duo August 25, 2009. Generating 20 percent of the nation's electricity from clean wind resources will ...

56

Low-Cost Installation of Concentrating Photovoltaic  

E-Print Network (OSTI)

Low-Cost Installation of Concentrating Photovoltaic Renewable Energy Research Renewable Energy Research http://www.energy.ca.gov/research/renewabl e/index.html August 2011 The Issue Several factors inhibit the potential growth of the California photovoltaic market: high installation costs, expenses

57

Photovoltaic Installations at Williams College Ruth Aronoff  

E-Print Network (OSTI)

of thumb that 10 Watts of power fit into every square foot of roof space (or 0.1 square meters). This means of the total array, panels cost between $7.50 and $10 per Watt of power installed; smaller systems cost slightly more to install per Watt, while larger systems cost less since they are bought in bulk

Aalberts, Daniel P.

58

Installation package for the solaron solar subsystems  

DOE Green Energy (OSTI)

This package contains information that is intended to be a guide for installation, operation, and maintenance of the various Solaron Solar Subsystems. The subsystems consist of the following: collectors, storage, transport (air handler) and controller for heat pump and off-peak storage. Two prototype residential systems have been installed at Akron, Ohio, and Duffield, Virginia.

Not Available

1979-04-01T23:59:59.000Z

59

Installation package for a solar heating system  

DOE Green Energy (OSTI)

Installation information is presented for a solar heating system installed in Concho Indian School at El Reno, Oklahoma. This package includes a system Operation and Maintenance Manual, hardware brochures, schematics, system operating modes and drawings. The Solar Engineering and Equipment Company (SEECO) developed this prototype solar heating system consisting of the following subsystems: solar collectors, control and storage.

Not Available

1978-12-01T23:59:59.000Z

60

Expanding Malware Defense by Securing Software Installations  

E-Print Network (OSTI)

installations. Our technique can support a diversity of package managers and software installers. It is based of the files used by benign software packages, thus blocking the most common mechanism used by malware future runs of an untrusted package will take place within an administrator-specified sandbox. Our

Sekar, R.

Note: This page contains sample records for the topic "installation problems bullet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Troubleshoot HRSG corrosion problems  

SciTech Connect

Heat-recovery steam generators (HRSGs) have come of age. At the same time, these boilers are more complex as designs are refined to maximize heat recovery. Hundreds of units are installed and now have years of operating experience providing valuable information that can benefit all HRSG owners. Experienced troubleshooters can anticipate potential problem areas and recommend cost-effective solutions. The HRSG corrosion problems summarized here--and the means by which they were identified and solved--are useful examples to alert other HRSG owners and operators to potential problem areas. Steps involved include thorough inspection and documentation, problem and cost/benefit analyses, and planning around outages.

Stanley, L.

1996-07-01T23:59:59.000Z

62

1981 Active-Solar-Installations Survey  

SciTech Connect

The survey gathered data on active residential and commercial solar systems installed during calendar year 1981 and a listing of firms involved in various aspects of the industry. The mail and telephone followup survey results are presented in 21 tables for combined national and state data. The total number of installations reported nationwide during 1981 was 122,907. Almost 95% of all reported installations were made in the single-family residential sector. The fewest quantity of installations (1.2%) was reported in the commercial sector. The remaining 4% was reported in the multifamily residential sector. Water heaters represented the largest number of systems installed in single-family, multifamily, and commercial buildings. The average size of water-heating systems in single-family homes was 61 square feet with an average cost of $3,235. Pool heaters represented the second largest number of systems installed in single-family and multifamily homes and represented 16.4% of the total installations. The average size of pool heaters in single-family homes was 376 square feet with an average cost of $3,455.

1982-12-01T23:59:59.000Z

63

Energy Conservation Installation Credit | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Conservation Installation Credit Energy Conservation Installation Credit Energy Conservation Installation Credit < Back Eligibility Multi-Family Residential Residential Savings Category Heating & Cooling Commercial Heating & Cooling Heating Home Weatherization Commercial Weatherization Sealing Your Home Cooling Design & Remodeling Windows, Doors, & Skylights Ventilation Heat Pumps Appliances & Electronics Commercial Lighting Lighting Water Heating Maximum Rebate 500 per individual; up to 1,000 for a married couple filing jointly Program Info State Montana Program Type Personal Tax Credit Rebate Amount 25% of cost of capital investment Provider Montana Department of Revenue Individual taxpayers may claim a credit against their tax liability for up to 25% of the costs of investment for energy conservation purposes in a

64

Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.  

SciTech Connect

Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

Richards, Elizabeth H.; Schindel, Kay (City of Madison, WI); Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William (Lindau Companies, Inc., Hudson, WI); Harper, Alan (City of Madison, WI)

2011-12-01T23:59:59.000Z

65

Performance of Installed Cooking Exhaust Devices  

NLE Websites -- All DOE Office Websites (Extended Search)

Performance of Installed Cooking Exhaust Devices Performance of Installed Cooking Exhaust Devices Brett C. Singer, William W. Delp, Michael G. Apte, Philip N. Price Environmental Energy Technologies Division Lawrence Berkeley National Laboratory Berkeley, California, 94720 November 2011 Direct funding for this research was provided by the California Energy Commission through Contracts 500-05-026 and 500-08-061. Institutional support is provided to LBNL by the U.S. Department of Energy, Office of Science under Contract DE-AC02-05CH11231. LBNL-5265E-r1(3) Singer et al., Performance of Installed Cooking Exhaust Devices LBNL-5265E-r1(3) Performance of Installed Cooking Exhaust Devices Brett C. Singer 1

66

Installed Geothermal Capacity | Open Energy Information  

Open Energy Info (EERE)

Geothermal Capacity Geothermal Capacity Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Print PDF Installed Geothermal Capacity International Market Map of U.S. Geothermal Power Plants List of U.S. Geothermal Power Plants Throughout the world geothermal energy is looked at as a potential source of renewable base-load power. As of 2005 there was 8,933 MW of installed power capacity within 24 countries. The International Geothermal Association (IGA) reported 55,709 GWh per year of geothermal electricity. The generation from 2005 to 2010 increased to 67,246 GWh, representing a 20% increase in the 5 year period. The IGA has projected that by 2015 the new installed capacity will reach 18,500 MW, nearly 10,000 MW greater than 2005. [1] Countries with the greatest increase in installed capacity (MW) between

67

File:Install.pdf | Open Energy Information  

Open Energy Info (EERE)

Install.pdf Install.pdf Jump to: navigation, search File File history File usage File:Install.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 86 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 13:48, 1 November 2012 Thumbnail for version as of 13:48, 1 November 2012 1,275 × 1,650 (86 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage There are no pages that link to this file. Retrieved from "http://en.openei.org/w/index.php?title=File:Install.pdf&oldid=53281

68

Property:InstalledCapacity | Open Energy Information  

Open Energy Info (EERE)

InstalledCapacity InstalledCapacity Jump to: navigation, search Property Name InstalledCapacity Property Type Quantity Description Installed Capacity (MW) or also known as Total Generator Nameplate Capacity (Rated Power) Use this property to express potential electric energy generation, such as Nameplate Capacity. The default unit is megawatts (MW). For spatial capacity, use property Volume. Acceptable units (and their conversions) are: 1 MW,MWe,megawatt,Megawatt,MegaWatt,MEGAWATT,megawatts,Megawatt,MegaWatts,MEGAWATT,MEGAWATTS 1000 kW,kWe,KW,kilowatt,KiloWatt,KILOWATT,kilowatts,KiloWatts,KILOWATT,KILOWATTS 1000000 W,We,watt,watts,Watt,Watts,WATT,WATTS 1000000000 mW,milliwatt,milliwatts,MILLIWATT,MILLIWATTS 0.001 GW,gigawatt,gigawatts,Gigawatt,Gigawatts,GigaWatt,GigaWatts,GIGAWATT,GIGAWATTS

69

Install an Automatic Blowdown Control System  

SciTech Connect

This revised ITP steam tip sheet on installing automatic blowdown controls provide how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

Not Available

2006-01-01T23:59:59.000Z

70

Peoples Gas Single Family Direct Install (Illinois)  

Energy.gov (U.S. Department of Energy (DOE))

Owners of single-family homes, condos, townhomes and two-flats may be eligible for a free installation of new programmable thermostats, pipe insulation, showerheads, and faucet aerators through...

71

Install Removable Insulation on Valves and Fittings  

Science Conference Proceedings (OSTI)

This revised ITP tip sheet on installing removable insulation on valves and fittings provides how-to advice for improving the system using low-cost, proven practices and technologies.

Not Available

2006-01-01T23:59:59.000Z

72

PC-1D installation manual and user's guide  

DOE Green Energy (OSTI)

PC-1D is a software package for personal computers that uses finite-element analysis to solve the fully-coupled two-carrier semiconductor transport equations in one dimension. This program is particularly useful for analyzing the performance of optoelectronic devices such as solar cells, but can be applied to any bipolar device whose carrier flows are primarily one-dimensional. This User's Guide provides the information necessary to install PC-1D, define a problem for solution, solve the problem, and examine the results. Example problems are presented which illustrate these steps. The physical models and numerical methods utilized are presented in detail. This document supports version 3.1 of PC-1D, which incorporates faster numerical algorithms with better convergence properties than previous versions of the program. 51 refs., 17 figs., 5 tabs.

Basore, P.A.

1991-05-01T23:59:59.000Z

73

CATEGORICAL EXCLUSION FOR INSTALLING A PHOTOVOLTAIC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-PNSO-0657 -PNSO-0657 CATEGORICAL EXCLUSION FOR INSTALLING A PHOTOVOLTAIC POWER GENERATION ARRAY AND ELECTRIC CAR CHARGING STATIONS, ENVIRONMENTAL MOLECULAR SCIENCES LABORATORY, PACIFIC NORTHWEST SITE OFFICE, RICHLAND, WASHINGTON Proposed Action The U.S. Department of Energy (DOE), Pacific Northwest Site Office (PNSO) proposes to install a photovoltaic power generation array and electric car charging stations. Location of Action The proposed action would occur in a landscaped infiltration swale located immediately

74

Riser, pipelines installed in Griffin field  

Science Conference Proceedings (OSTI)

A mooring riser and flow lines along with a 67-km, 8-in., gas-export pipelines have been installed offshore Australia for BHP Petroleum's Griffin field development. The 66-km gas line will carry Griffin field gas to an onshore gas-processing plant. Completing the projects ahead of schedule was Clough Stena Joint Venture (Asia), Perth. BHP awarded the contracts in early 1993; the project was completed in January this year. The paper describes the contractor, pipeline installation, and handling equipment.

Not Available

1994-05-23T23:59:59.000Z

75

T-729: Mozilla Code Installation Through Holding Down Enter | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Mozilla Code Installation Through Holding Down Enter 9: Mozilla Code Installation Through Holding Down Enter T-729: Mozilla Code Installation Through Holding Down Enter September 29, 2011 - 8:30am Addthis PROBLEM: Mozilla Code Installation Through Holding Down Enter. PLATFORM: Versions prior to the following are vulnerable: Firefox 7.0 Firefox 3.6.23 Thunderbird 7.0 SeaMonkey 2.4 ABSTRACT: Attackers can exploit this issue by enticing an unsuspecting victim into viewing and interacting with a malicious Web page. An attacker may be able to exploit this issue to bypass a confirmation dialog and install an arbitrary add-on. This may aid in further attacks. reference LINKS: Mozilla Foundation Security Advisory 2011-40 Firefox Security Advisories CVE-2011-2372 CVE-2011-3001 IMPACT ASSESSMENT: High Discussion: If a user holds down the Enter key--as part of a game or test, perhaps--a

76

Windows Vista vs Ubuntu Installaci: procs, temps i problemes  

E-Print Network (OSTI)

Windows Vista vs Ubuntu #12;Índex Instal·lació: procés, temps i problemes Aplicacions Temps d·lació: procés, temps i problemes Procés d'instal·lació de Windows Vista Procés d'instal·lació de Linux Ubuntu 7.04 Temps total Problemes #12;Instal·lació Windows Vista (I) #12;Instal·lació Windows Vista (II

Politècnica de Catalunya, Universitat

77

Solar energy system installed at Mount Rushmore National Visitor Center in Keystone, South Dakota  

SciTech Connect

Information is provided on the system description, the design, and installation of the solar energy system installed at the Mount Rushmore Visitor Center. The system is designed to furnish about 45 percent of the heating for the total facility and about 53 percent partial cooling for the 2000 square-foot observatory. Such items as Acceptance Test Data, a complete set of as-build drawings, system performance data, problems, pictures, and other pertinent materials are included.

1979-06-01T23:59:59.000Z

78

Design and installation manual for thermal energy storage  

DOE Green Energy (OSTI)

The purpose for this manual is to provide information on the design and installation of thermal energy storage in solar heating systems. It is intended for contractors, installers, solar system designers, engineers, architects, and manufacturers who intend to enter the solar energy business. The reader should have general knowledge of how solar heating systems operate and knowledge of construction methods and building codes. Knowledge of solar analysis methods such as f-chart, SOLCOST, DOE-1, or TRNSYS would be helpful. The information contained in the manual includes sizing storage, choosing a location for the storage device, and insulation requirements. Both air-based and liquid-based systems are covered with topics on designing rock beds, tank types, pump and fan selection, installation, costs, and operation and maintenance. Topics relevant to heating domestic water include safety, single- and dual-tank systems, domestic water heating with air- and liquid-based space heating system, and stand-alone domestic hot water systems. Several appendices present common problems with storage systems and their solutions, heat transfer fluid properties, heat exchanger sizing, and sample specifications for heat exchangers, wooden rock bins, steel tanks, concrete tanks, and fiberglass-reinforced plastic tanks.

Cole, R L; Nield, K J; Rohde, R R; Wolosewicz, R M [eds.

1979-02-01T23:59:59.000Z

79

Design and installation manual for thermal energy storage  

DOE Green Energy (OSTI)

The purpose of this manual is to provide information on the design and installation of thermal energy storage in active solar systems. It is intended for contractors, installers, solar system designers, engineers, architects, and manufacturers who intend to enter the solar energy business. The reader should have general knowledge of how solar heating and cooling systems operate and knowledge of construction methods and building codes. Knowledge of solar analysis methods such as f-Chart, SOLCOST, DOE-1, or TRNSYS would be helpful. The information contained in the manual includes sizing storage, choosing a location for the storage device, and insulation requirements. Both air-based and liquid-based systems are covered with topics on designing rock beds, tank types, pump and fan selection, installation, costs, and operation and maintenance. Topics relevant to latent heat storage include properties of phase-change materials, sizing the storage unit, insulating the storage unit, available systems, and cost. Topics relevant to heating domestic water include safety, single- and dual-tank systems, domestic water heating with air- and liquid-based space heating systems, and stand alone domestics hot water systems. Several appendices present common problems with storage systems and their solutions, heat transfer fluid properties, economic insulation thickness, heat exchanger sizing, and sample specifications for heat exchangers, wooden rock bins, steel tanks, concrete tanks, and fiberglass-reinforced plastic tanks.

Cole, R L; Nield, K J; Rohde, R R; Wolosewicz, R M

1980-01-01T23:59:59.000Z

80

Environmental safety evaluations for nuclear installations  

SciTech Connect

Environmental safety has been an important consideration in the siting, design, and operation of nuclear installations. As a result there have been very few cases in which the releases of radioactive materials from these installations have posed a dosimetrically significant environmental risk, and almost all of these have been connected with accidents or other unintentional situations. In no situation do the intentional releases from nuclear installations appear to have posed significant environmental risks, and with adequate planning and design a high degree of environmental safety may be assured. Many disciplines are involved in the evaluation of safety for nuclear installations. These include such fundamental ones as physics, chemistry, and biology, and more specialized ones such as meteorology, engineering, ecology, medicine, and electronics. A comprehensive review of environmental surveillance data and estimates of dose commitments from nuclear installations suggests that compared to the doses from background and from fallout, those attributable to the effluents from nuclear facilities have been small and for the most part quite local. it is concluded that, the upper limit of the risk associated with exposure of up to a few millirems per year is indeed small compared to many other commonly accepted risks of living in present day society. (72 refurences) (CH)

Hull, A.P.

1973-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "installation problems bullet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Electric Vehicle Supply Equipment Installed Cost Analysis  

Science Conference Proceedings (OSTI)

More than 140,000 plug-in electric vehicles (PEVs) have been sold since December 2010. Critical to maintaining this upward trend is achievement of a diverse and available charging infrastructure. The purpose of this study is to analyze one key element of the charging infrastructurethe cost of installation. While the fuel cost of electricity to charge a PEV is significantly lower than the cost of gasoline, the cost to hire an electrician to install electric vehicle supply equipment (EVSE) for ...

2013-12-06T23:59:59.000Z

82

Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cove, Columbia, SC  

DOE Green Energy (OSTI)

Information is presented concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water. Included are such items as principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system. Also included are trouble-shooting charts and maintenance schedules.

Not Available

1980-09-01T23:59:59.000Z

83

Alternative Fuels Data Center: Installation of Alternative Fuel Components  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Installation of Installation of Alternative Fuel Components in Vehicles to someone by E-mail Share Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on Facebook Tweet about Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on Twitter Bookmark Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on Google Bookmark Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on Delicious Rank Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on Digg Find More places to share Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on AddThis.com... More in this section... Federal

84

Changes related to "New England Breeze Solar and Wind Installers...  

Open Energy Info (EERE)

this page on Facebook icon Twitter icon Changes related to "New England Breeze Solar and Wind Installers" New England Breeze Solar and Wind Installers Jump to:...

85

Safety Advisory 2007-03: OSHA Revises its Electrical Installation...  

NLE Websites -- All DOE Office Websites (Extended Search)

851. SUMMARY Changes to OSHA's general industry electrical installation standard focus on safety in the design and installation of electric equipment in the workplace. Some of the...

86

Five Million Smart Meters Installed Nationwide is Just the Beginning...  

NLE Websites -- All DOE Office Websites (Extended Search)

Five Million Smart Meters Installed Nationwide is Just the Beginning of Smart Grid Progress Five Million Smart Meters Installed Nationwide is Just the Beginning of Smart Grid...

87

Property:Installed Capacity (MW) | Open Energy Information  

Open Energy Info (EERE)

Capacity (MW) Jump to: navigation, search Property Name Installed Capacity (MW) Property Type Number Retrieved from "http:en.openei.orgwindex.php?titleProperty:InstalledCapac...

88

Installation-Restoration Program Records search for Des Moines Air National Guard Installation, Iowa  

SciTech Connect

Conclusions are: 1) Information obtained through interviews with 17 past and present installation personnel, installation records, shop folders, and field observations indicate that the Des Monies ANG Installation property has been used for disposal of small quantities of hazardous material in the past. 2) No evidence of environmental stress resulting from past disposal practices was observed at the Des Moines ANG installation. 3) In the priority listing of the three rated sites and their overall scores, the Facility 105 Vehicle Maintenance Fuel Tank, and the existing fire department training area, exhibit the most-significant potential (relative to the other Des Moines ANG Installation sites) for environmental concerns. 4) The old fire department training area located at Facility No. 228, is not considered to present significant concern for adverse effects on health or the environment.

1983-09-01T23:59:59.000Z

89

Electrical installations in oil shale mines. Open file report 21 Sep 81-13 Aug 83  

SciTech Connect

This report presents recommended guidelines and regulatory changes applicable to electrical installations in underground oil shale mines. These recommendations are based on information gathered from oil shale operators, government agencies, and other knowledgeable sources familiar with existing plans for mining systems and electrical installations, and on present understanding of the problems and hazards associated with oil shale mining. Additional discussions of specific electrical problems related to oil shale mining include ground fault current levels, permissible electric wheel motors, permissible batteries and electric starting systems, intrinsically safe instrumentation, and applicability of existing test standards.

Gillenwater, B.B.; Kline, R.J.; Paas, N.

1983-08-01T23:59:59.000Z

90

Offshore Wind Turbines and Their Installation  

Science Conference Proceedings (OSTI)

Offshore winds tend to be higher, more constant and not disturbed by rough terrain, so there is a large potential for utilizing wind energy near to the sea. Compared with the wind energy converters onland, wind turbine components offshore will subject ... Keywords: renewable energy, wind power generation, offshore wind turbines, offshore installation

Liwei Li; Jianxing Ren

2010-01-01T23:59:59.000Z

91

On software component co-installability  

Science Conference Proceedings (OSTI)

Modern software systems are built by composing components drawn from large repositories, whose size and complexity is increasing at a very fast pace. A fundamental challenge for the maintainability and the scalability of such software systems is the ... Keywords: co-installability, component, conflicts, dependencies, open source, package management

Roberto Di Cosmo; Jrme Vouillon

2011-09-01T23:59:59.000Z

92

Performance of Installed Cooking Exhaust Devices  

NLE Websites -- All DOE Office Websites (Extended Search)

Performance of Installed Cooking Exhaust Devices Performance of Installed Cooking Exhaust Devices Title Performance of Installed Cooking Exhaust Devices Publication Type Journal Article Refereed Designation Refereed LBNL Report Number LBNL-5265E Year of Publication 2012 Authors Singer, Brett C., William W. Delp, Michael G. Apte, and Phillip N. Price Journal Indoor Air Volume 22 Issue 3 Pagination 224-234 Date Published 06/2012 Keywords carbon monoxide, natural gas burners, nitrogen dioxide, range hood, task ventilation, unvented combustion, indoor environment group, Range Hood Test Facility Abstract The performance metrics of airflow, sound, and combustion product capture efficiency (CE) were measured for a convenience sample of fifteen cooking exhaust devices, as installed in residences. Results were analyzed to quantify the impact of various device- and installation-dependent parameters on CE. Measured maximum airflows were 70% or lower than values noted on product literature for 10 of the devices. Above-the-cooktop devices with flat bottom surfaces (no capture hood) - including exhaust fan/microwave combination appliances - were found to have much lower CE at similar flow rates, compared to devices with capture hoods. For almost all exhaust devices and especially for rear-mounted downdraft exhaust and microwaves, CE was substantially higher for back compared with front burner use. Flow rate, and the extent to which the exhaust device extends over the burners that are in use, also had a large effect on CE. A flow rate of 95 liters per second (200 cubic feet per minute) was necessary, but not sufficient, to attain capture efficiency in excess of 75% for the front burners. A-weighted sound levels in kitchens exceeded 57 dB when operating at the highest fan setting for all 14 devices evaluated for sound performance.

93

Milwaukee Installer Reflects on His Career In Solar  

Energy.gov (U.S. Department of Energy (DOE))

Interested in joining America's solar workforce? One Milwaukee solar installer shares his career reflections and advice.

94

Installation package for Sunpak solar collectors  

DOE Green Energy (OSTI)

Owens-Illinois, Inc., has developed a subsystem (air/liquid vacuum collector) for use with solar combined heating and cooling subsystems. The Model SEC-601 collector is modular in design, is approximately twelve-feet-three-inches wide and is eight-feet-seven-inches high. The module contains 72 collector tube elements and weighs approximately 300 pounds. The Installation, Operating, and Maintenance Instructions, List of Materials and the Assembly Drawing are presented.

Not Available

1978-09-01T23:59:59.000Z

95

Power reduction control for inductive lighting installation  

SciTech Connect

A control system for continuously, selectively reducing power consumption in an inductive lighting installation energized from an A.C. power source, the installation including at least one gas discharge lamp such as a fluorescent lamp energized through any of a plurality of different types of electromagnetic ballast having different harmonic distortion characteristics, the control system is described comprising: load energizing circuit means, including a signal-actuated normally-closed primary switch, for connecting an A.C. power source to the lighting installation; a signal-actuated, normally-open secondary switch connected in parallel with the lighting installation; actuation means for generating actuation signals and applying such actuation signals to the primary and secondary switches to actuate the primary switch open and to actuate the secondary switch closed in approximate time coincidence in each half-cycle of the A.C. power; zero-crossing detector means for generating zero-crossing signals at times TX indicative of zero-voltage transitions in the A.C. power; and program means, connected to the zero-crossing detector means and to the actuation means, programming the actuation means to generate (a) power reduction actuation signals at times T1 and T2 in each half-cycle of the A.C. power, (b) a first filter actuation signal at a time T3 prior to each zero-crossing time TX, and (c) a second filter actuation signal at a time T4 following each zero-crossing time TX; the program means including a plurality of programs each establishing a set of times T1, T2, T3 and T4 for several different power reduction levels for a particular type of ballast; and selection means for selecting a program to match the ballast type of the load.

Falk, K.R.

1993-06-22T23:59:59.000Z

96

Extra-Territorial Siting of Nuclear Installations  

Science Conference Proceedings (OSTI)

Arrangements might be created for siting nuclear installations on land ceded by a host State for administration by an international or multinational organization. Such arrangements might prove useful in terms of resolving suspicions of proliferation in troubled areas of the world, or as a means to introduce nuclear activities into areas where political, financial or technical capabilities might otherwise make such activities unsound, or as a means to enable global solutions to be instituted for major nuclear concerns (e.g., spent fuel management). The paper examines practical matters associated with the legal and programmatic aspects of siting nuclear installations, including diplomatic/political frameworks, engaging competent industrial bodies, protection against seizure, regulation to ensure safety and security, waste management, and conditions related to the dissolution of the extra-territorial provisions as may be agreed as the host State(s) achieve the capabilities to own and operate the installations. The paper considers the potential for using such a mechanism across the spectrum of nuclear power activities, from mining to geological repositories for nuclear waste. The paper considers the non-proliferation dimensions associated with such arrangements, and the pros and cons affecting potential host States, technology vendor States, regional neighbors and the international community. It considers in brief potential applications in several locations today.

Shea, Thomas E.; Morris, Frederic A.

2009-10-07T23:59:59.000Z

97

Photovoltaic Installation on a Commercial Building (Bishop Museum) -- Design and Installation  

Science Conference Proceedings (OSTI)

This report, the first of two deliverable reports provided to the Electric Power Research Institute (EPRI) under Research and Development (R&D) Agreement No. EP-P7353/C3739 (Building Integrated Photovoltaic Commercial Building Project), provides information on the design and installation of a photovoltaic (PV) system installed at the State Museum of Natural and Cultural History (Bishop Museum) located in Honolulu, Hawaii. Details on structural specifications, PV system design and specifications, and less...

2004-02-13T23:59:59.000Z

98

Control center survey: Installed and planned applications software  

SciTech Connect

This project surveyed the utility industry use of applications. In addition, the survey collected information regarding future plans to add applications, interest in and knowledge about new control center technologies and identification of current problems that might be solved by new software applications. Over three hundred (300) utilities were surveyed consisting of the investor-owned, rural electric generation and transmission cooperatives, municipal power pools and federally chartered utilities. Of these utilities, 10 are Canadian and 7 are power pools. The rest are United States utilities having a peak demand on installed capacity above 200 MW. The survey was conducted by mailing a questionnaire and/or following up with a telephone call. Information was received from 282 utilities, a 94% response. 13 figs., 14 tabs.

Not Available

1990-02-01T23:59:59.000Z

99

Alternative Fuels Data Center: Installing New E85 Equipment  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Installing New E85 Installing New E85 Equipment to someone by E-mail Share Alternative Fuels Data Center: Installing New E85 Equipment on Facebook Tweet about Alternative Fuels Data Center: Installing New E85 Equipment on Twitter Bookmark Alternative Fuels Data Center: Installing New E85 Equipment on Google Bookmark Alternative Fuels Data Center: Installing New E85 Equipment on Delicious Rank Alternative Fuels Data Center: Installing New E85 Equipment on Digg Find More places to share Alternative Fuels Data Center: Installing New E85 Equipment on AddThis.com... More in this section... Ethanol Basics Benefits & Considerations Stations Locations Infrastructure Development Business Case Equipment Options Equipment Installation Codes, Standards, & Safety Vehicles Laws & Incentives

100

Jim Walter Resources installs new overland conveyor  

Science Conference Proceedings (OSTI)

Embarking on a major expansion plan, the company is constructing a new additional overland conveyor coal to a recently refurbished prep plant. Jim Walter Resources recently invested $20 million in a new 5-mile overland conveyor system to haul coal from the No.7 deep coal mine in Alabama to the No.5 coal preparation plant. The size of the No.7 mine was effectively doubled. The article describes how this expansion move was decided upon and describes the design and installation of the new conveyor which spans approximately 5 miles. 4 photos.

Fiscor, S.

2008-12-15T23:59:59.000Z

Note: This page contains sample records for the topic "installation problems bullet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Installation package for concentrating solar collector panels  

DOE Green Energy (OSTI)

Northrup, Inc., has developed and delivered 300 square feet of Concentrating Solar Collector (ML Series) and Attitude Control System, under the direction of the National Aeronautics and Space Administration. The ''ML Series'' Solar Collector Panels comprise a complete package array consisting of collector panels using modified Fresnel Prismatic Lenses for a 10 to 1 concentrating ration, supporting framework, fluid manifolding and tracking drive system, in unassembled components for field erection. The Installation, Operation and Maintenance Manual, Warranty, List of Materials, Sub-Assembly drawings and Final Field Assembly Drawings are included in the package.

Not Available

1978-08-01T23:59:59.000Z

102

THE DYNAMICS OF MERGING CLUSTERS: A MONTE CARLO SOLUTION APPLIED TO THE BULLET AND MUSKET BALL CLUSTERS  

SciTech Connect

Merging galaxy clusters have become one of the most important probes of dark matter, providing evidence for dark matter over modified gravity and even constraints on the dark matter self-interaction cross-section. To properly constrain the dark matter cross-section it is necessary to understand the dynamics of the merger, as the inferred cross-section is a function of both the velocity of the collision and the observed time since collision. While the best understanding of merging system dynamics comes from N-body simulations, these are computationally intensive and often explore only a limited volume of the merger phase space allowed by observed parameter uncertainty. Simple analytic models exist but the assumptions of these methods invalidate their results near the collision time, plus error propagation of the highly correlated merger parameters is unfeasible. To address these weaknesses I develop a Monte Carlo method to discern the properties of dissociative mergers and propagate the uncertainty of the measured cluster parameters in an accurate and Bayesian manner. I introduce this method, verify it against an existing hydrodynamic N-body simulation, and apply it to two known dissociative mergers: 1ES 0657-558 (Bullet Cluster) and DLSCL J0916.2+2951 (Musket Ball Cluster). I find that this method surpasses existing analytic models-providing accurate (10% level) dynamic parameter and uncertainty estimates throughout the merger history. This, coupled with minimal required a priori information (subcluster mass, redshift, and projected separation) and relatively fast computation ({approx}6 CPU hours), makes this method ideal for large samples of dissociative merging clusters.

Dawson, William A., E-mail: wadawson@ucdavis.edu [Physics Department, University of California, Davis, One Shields Avenue, Davis, CA 95616 (United States)

2013-08-01T23:59:59.000Z

103

Assembling and Installing LRUs for NIF  

SciTech Connect

Within the 192 National Ignition Facility (NIF) beamlines, there are over 7000 large (40 x 40 cm) optical components, including laser glass, mirrors, lenses, and polarizers. These optics are held in large opto-mechanical assemblies called line-replaceable units (LRUs). Each LRU has strict specifications with respect to cleanliness, alignment, and wavefront so that once activated, each NIF beamline will meet its performance requirements. NIF LRUs are assembled, tested, and refurbished in on-site cleanroom facilities. The assembled LRUs weigh up to 1800 kilograms, and are about the size of a phone booth. They are transported in portable clean canisters and inserted into the NIF beampath using robotic transporters. This plug and play design allows LRUs to be easily removed from the beampath for maintenance or upgrades. Commissioning of the first NIF quad, an activity known as NIF Early Light (NEL), has validated LRU designs and architecture, as well as demonstrated that LRUs can be assembled and installed as designed. Furthermore, it has served to develop key processes and tools forming the foundation for NIF s long-term LRU production and maintenance strategy. As we look forward to building out the rest of NIF, the challenge lies in scaling up the production rate while maintaining quality, implementing process improvements, and fully leveraging the learning and experience gained from NEL. This paper provides an overview of the facilities, equipment and processes used to assemble and install LRUs in NIF.

Bonanno, R E

2003-12-31T23:59:59.000Z

104

Performance of Installed Cooking Exhaust Devices  

Science Conference Proceedings (OSTI)

The performance metrics of airflow, sound, and combustion product capture efficiency (CE) were measured for a convenience sample of fifteen cooking exhaust devices, as installed in residences. Results were analyzed to quantify the impact of various device- and installation-dependent parameters on CE. Measured maximum airflows were 70% or lower than values noted on product literature for 10 of the devices. Above-the-cooktop devices with flat bottom surfaces (no capture hood) including exhaust fan/microwave combination appliances were found to have much lower CE at similar flow rates, compared to devices with capture hoods. For almost all exhaust devices and especially for rear-mounted downdraft exhaust and microwaves, CE was substantially higher for back compared with front burner use. Flow rate, and the extent to which the exhaust device extends over the burners that are in use, also had a large effect on CE. A flow rate of 95 liters per second (200 cubic feet per minute) was necessary, but not sufficient, to attain capture efficiency in excess of 75% for the front burners. A-weighted sound levels in kitchens exceeded 57 dB when operating at the highest fan setting for all 14 devices evaluated for sound performance.

Singer, Brett C.; Delp, William W.; Apte, Michael G.; Price, Philip N.

2011-11-01T23:59:59.000Z

105

Collimateur integration and installation Example of one object to be installed in the LHC  

E-Print Network (OSTI)

The collimation system is a vital part of the LHC project, protecting the accelerator against unavoidable regular and irregular beam loss. About 80 collimators will be installed in the machine before the first run. Two insertion regions are dedicated to collimation and these regions will be among the most radioactive in the LHC. The space available in the collimation regions is very restricted, it was therefore important to ensure that the 3-D integration of these areas of the LHC tunnel would allow straightforward installation of collimators and also exchange of collimators under the remote handling constraints imposed by high radiation levels. The paper describes the 3-D integration studies and verifications of the collimation regions combining the restricted space available, the dimensions of the different types of collimators and the space needed for transport and handling. The paper explains how installation has been planned and carried out taking into account the handling.

Aberle, O; Chamizo, R; Weiler, T; Chemli, S; Corso, J P; Coupard, J; Delsaux, F; Foraz, K; Jimnez, J M; Kadi, Y; Kershaw, K; Lazzaroni, M; Perret, R; Bertone, C; Grenard, J L

2008-01-01T23:59:59.000Z

106

Choosing and Installing Geothermal Heat Pumps | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Choosing and Installing Geothermal Heat Pumps Choosing and Installing Geothermal Heat Pumps Choosing and Installing Geothermal Heat Pumps June 24, 2012 - 3:55pm Addthis These geothermal heating and cooling units installed in the basement of a new home are tied to a complex array of underground coils to keep indoor temperatures comfortable. | Photo courtesy of ©iStockphoto/BanksPhotos These geothermal heating and cooling units installed in the basement of a new home are tied to a complex array of underground coils to keep indoor temperatures comfortable. | Photo courtesy of ©iStockphoto/BanksPhotos What does this mean for me? Installing a geothermal heat pump is not a do-it-yourself job. When you hire a contractor to install your geothermal heat pump, ask for and check references of installations that are several years old.

107

Choosing and Installing Geothermal Heat Pumps | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Choosing and Installing Geothermal Heat Pumps Choosing and Installing Geothermal Heat Pumps Choosing and Installing Geothermal Heat Pumps June 24, 2012 - 3:55pm Addthis These geothermal heating and cooling units installed in the basement of a new home are tied to a complex array of underground coils to keep indoor temperatures comfortable. | Photo courtesy of ©iStockphoto/BanksPhotos These geothermal heating and cooling units installed in the basement of a new home are tied to a complex array of underground coils to keep indoor temperatures comfortable. | Photo courtesy of ©iStockphoto/BanksPhotos What does this mean for me? Installing a geothermal heat pump is not a do-it-yourself job. When you hire a contractor to install your geothermal heat pump, ask for and check references of installations that are several years old.

108

Tracking the Sun III The Installed Cost of Photovoltaics  

E-Print Network (OSTI)

Contents The Installed Cost of Photovoltaics in the U.S. from 1998-2009 Environmental Energy Technologies .................................................................... 10 4. PV Incentive and Net Installed Cost Trends ....................................... 27 5 Appendix A: Data Cleaning, Coding, and Standardization ....................... 36 Appendix B: Detailed

109

Issue #3: HVAC Proper Installation Energy Savings: Over-Promising...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: HVAC Proper Installation Energy Savings: Over-Promising or Under-Delivering? Issue 3: HVAC Proper Installation Energy Savings: Over-Promising or Under-Delivering? What energy...

110

Design and installation package for a solar powered pump  

DOE Green Energy (OSTI)

Information is presented to evaluate the design and installation procedures of a solar powered pump developed by Calmac Manufacturing Company. Included is information about subsystem installation, operation and maintenance requirements, subsystem performance specifications, and detailed design drawings.

Not Available

1978-07-01T23:59:59.000Z

111

Energy Department Launches SunShot Prize Competition to Install...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SunShot Prize Competition to Install Solar Energy Systems at a Fraction of Today's Price Energy Department Launches SunShot Prize Competition to Install Solar Energy Systems at a...

112

Energy Saving 'Cool Roofs' Installed at Y-12 | National Nuclear...  

National Nuclear Security Administration (NNSA)

Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Energy Saving 'Cool Roofs' Installed at Y-12 Energy Saving 'Cool Roofs' Installed at Y-12...

113

Observations from the field: Solar domestic hot water installation recommendations  

SciTech Connect

The Florida Solar Energy Center (FSEC) was ten years old in 1984. Constant contact has been maintained between the Center and solar businesses selling and installing domestic hot water systems in Florida and throughout the Southern states of the Caribbean. FSEC has thus had the opportunity to visit or discuss thousands of DHW system installations with homeowners and installers. This paper provides an overview of lessons learned and some of the resulting installation recommendations for direct, open-loop domestic hot water systems.

Cromer, C.J.

1985-01-01T23:59:59.000Z

114

NREL Job Task Analysis: Retrofit Installer Technician (Revised)  

SciTech Connect

A summary of job task analyses for the position of retrofit installer technician when conducting weatherization work on a residence.

Kurnik, C.; Woodley, C.

2012-04-01T23:59:59.000Z

115

UDS Recovery Equipment Installation (AFCI CETE Milestone Report)  

SciTech Connect

This letter documents the successful installation of the un-dissolved solids (UDS) recovery equipment into the hot-cell in building 7920 at ORNL. This installation (see Figure 1) satisfies the AFCI Level 4 milestone in the CETE Investments and Hot Cell Upgrades work package (OR0915020323) to 'Complete UDS recovery equipment installation' (M4502032306), due 30 June 09.

Jubin, Robert Thomas [ORNL

2009-06-01T23:59:59.000Z

116

CNTA_Well_Installation_Report.book  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Security Administration Nuclear Security Administration Nevada Site Office Environmental Restoration Division Nevada Environmental Restoration Project Well Installation Report for Corrective Action Unit 443, Central Nevada Test Area Nye County, Nevada Revision No.: 0 January 2006 Approved for public release; further dissemination unlimited. DOE/NV--1102 Uncontrolled When Printed Available for public sale, in paper, from: U.S. Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 Phone: 800.553.6847 Fax: 703.605.6900 Email: orders@ntis.gov Online ordering: http://www.ntis.gov/ordering.htm Available electronically at http://www.osti.gov/bridge Available for a processing fee to U.S. Department of Energy and its contractors, in paper, from:

117

Nuclear Plant Analyzer: Installation manual. Volume 1  

SciTech Connect

This report contains the installation instructions for the Nuclear Plant Analyzer (NPA) System. The NPA System consists of the Computer Visual System (CVS) program, the NPA libraries, the associated utility programs. The NPA was developed at the Idaho National Engineering Laboratory under the sponsorship of the US Nuclear Regulatory Commission to provide a highly flexible graphical user interface for displaying the results of these analysis codes. The NPA also provides the user with a convenient means of interactively controlling the host program through user-defined pop-up menus. The NPA was designed to serve primarily as an analysis tool. After a brief introduction to the Computer Visual System and the NPA, an analyst can quickly create a simple picture or set of pictures to aide in the study of a particular phenomenon. These pictures can range from simple collections of square boxes and straight lines to complex representations of emergency response information displays.

Snider, D.M.; Wagner, K.L.; Grush, W.H.; Jones, K.R. [Idaho National Engineering Lab., Idaho Falls, ID (United States)]|[Lockheed Idaho Technologies Co., Idaho Falls, ID (United States)

1995-01-01T23:59:59.000Z

118

Using remote installation services for windows to streamline installations in the UTPB computer science research lab  

Science Conference Proceedings (OSTI)

The Computer Science Research Lab at The University of Texas of the Permian Basin (UTPB) is operated by three part-time student assistants with minimal faculty supervision. This lab supports seven Windows and Sun Solaris servers and approximately thirty ... Keywords: RIS, remote installation, windows

Cherry Owen; Dustin Piper

2006-11-01T23:59:59.000Z

119

Handbook of experiences in the design and installation of solar heating and cooling systems  

DOE Green Energy (OSTI)

A large array of problems encountered are detailed, including design errors, installation mistakes, cases of inadequate durability of materials and unacceptable reliability of components, and wide variations in the performance and operation of different solar systems. Durability, reliability, and design problems are reviewed for solar collector subsystems, heat transfer fluids, thermal storage, passive solar components, piping/ducting, and reliability/operational problems. The following performance topics are covered: criteria for design and performance analysis, domestic hot water systems, passive space heating systems, active space heating systems, space cooling systems, analysis of systems performance, and performance evaluations. (MHR)

Ward, D.S.; Oberoi, H.S.

1980-07-01T23:59:59.000Z

120

Installing R and R-Commander This appendix gives detailed instructions for installing R and R-Commander.  

E-Print Network (OSTI)

"Subdirectories", and install "tcltk.dmg" (universal build of Tcl/Tk for X11). This file includes additional tools

Utts, Jessica

Note: This page contains sample records for the topic "installation problems bullet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

InterTechnology Corporation report of solar energy systems installation costs for selected commercial buildings  

DOE Green Energy (OSTI)

The results of a study in which the primary objective was to determine actual costs associated with the installation of solar collector and thermal energy storage subsystems in specific non-residential building applications are presented. A secondary objective of the study was to assemble details of existing solar collector and storage subsystem installations, including caveats concerning cost estimating, logistics and installation practices. The study began with the development of an exhaustive listing and compilation of basic data and contacts for non-residential applications of solar heating and cooling of buildings. Both existing projects and those under construction were surveyed. Survey summary sheets for each project encountered are provided as a separate appendix. Subsequently, the rationale used to select the projects studied in-depth is presented. The results of each of the detailed studies are then provided along with survey summary sheets for each of the projects studied. Installation cost data are summarized and the significance of the differences and similarities between the reported projects is discussed. After evaluating the data obtained from the detailed studies, methods for reducing installation labor costs are postulated based on the experience of the study. Some of the methods include modularization of collectors, preplumbing and preinsulating, and collector placement procedures. Methods of cost reduction and a summary discussion of prominent problems encountered in the projects are considered.(WHK)

None

1976-12-01T23:59:59.000Z

122

The Silver Bullet: Storage!  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Compressor operates at low load periods; gas turbine serves load as needed - Smoothes out loadsupply profile with quick response * PJM is working with FirstEnergy on Norton CAES...

123

Standard Bullets and Casings  

Science Conference Proceedings (OSTI)

... Figure 2. On the left, a NIST SRM 2461 ... Case mounted on a brass cylinder holder; right, optical micrograph ... the data are in ASCII tab delimited format ...

2012-08-31T23:59:59.000Z

124

Spain Installed Wind Capacity Website | Open Energy Information  

Open Energy Info (EERE)

Spain Installed Wind Capacity Website Spain Installed Wind Capacity Website Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Spain Installed Wind Capacity Website Focus Area: Renewable Energy Topics: Market Analysis Website: www.gwec.net/index.php?id=131 Equivalent URI: cleanenergysolutions.org/content/spain-installed-wind-capacity-website Language: English Policies: Regulations Regulations: Feed-in Tariffs This website presents an overview of total installed wind energy capacity in Spain per year from 2000 to 2010. The page also presents the main market developments from 2010; a policy summary; a discussion of the revision in feed-in tariffs in 2010; and a future market outlook. References Retrieved from "http://en.openei.org/w/index.php?title=Spain_Installed_Wind_Capacity_Website&oldid=514562"

125

Property:Incentive/InstallReqs | Open Energy Information  

Open Energy Info (EERE)

InstallReqs InstallReqs Jump to: navigation, search Property Name Incentive/InstallReqs Property Type Text Description Installation Requirements. Pages using the property "Incentive/InstallReqs" Showing 25 pages using this property. (previous 25) (next 25) A AEP Appalachian Power - Commercial and Industrial Rebate Programs (West Virginia) + Self-installed measures with a rebate level greater than $1,000 and all applications over $20,000, and 5% of remaining applicants will be inspected. Funds can be reserved for a period of 180 days as long as the application includes an expected date of project completion. Customer must have an active account in WV with either Wheeling Power Company, American Electric Power or Appalachian Power Company.

126

Installing and Maintaining a Home Solar Electric System | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Installing and Maintaining a Home Solar Electric System Installing and Maintaining a Home Solar Electric System Installing and Maintaining a Home Solar Electric System July 2, 2012 - 8:21pm Addthis When choosing a contractor, ask about their work record, experience, and licenses, and get more than one bid for the installation of your PV system. | Photo courtesy of Dennis Schroeder, NREL. When choosing a contractor, ask about their work record, experience, and licenses, and get more than one bid for the installation of your PV system. | Photo courtesy of Dennis Schroeder, NREL. How does it work? Making sure your home solar electric or PV system is sized, sited, and installed correctly is essential for maximizing its energy performance. As with any mechanical or electrical appliance, PV systems require routine, periodic maintenance.

127

Installing and Maintaining a Small Wind Electric System | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Installing and Maintaining a Small Wind Electric System Installing and Maintaining a Small Wind Electric System Installing and Maintaining a Small Wind Electric System July 2, 2012 - 8:22pm Addthis Installing and Maintaining a Small Wind Electric System What does this mean for me? When installing a wind system, the location of the system, the energy budget for the site, the size of the system, and the height of the tower are important elements to consider. Deciding whether to connect the system to the electric grid or not is also an important decision. If you went through the planning steps to evaluate whether a small wind electric system will work at your location, you will already have a general idea about: The amount of wind at your site The zoning requirements and covenants in your area The economics, payback, and incentives of installing a wind system

128

Solar Industry At Work: Streamlining Home Solar Installation | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Industry At Work: Streamlining Home Solar Installation Solar Industry At Work: Streamlining Home Solar Installation Solar Industry At Work: Streamlining Home Solar Installation June 12, 2012 - 11:59am Addthis Sunrun is a home solar installation company based in San Francisco. | Photo by Francis Fine Art Photography. Sunrun is a home solar installation company based in San Francisco. | Photo by Francis Fine Art Photography. Erin R. Pierce Erin R. Pierce Digital Communications Specialist, Office of Public Affairs What are the key facts? Tillie Peterson works at Sunrun a home solar installation company based in San Francisco. As Director of Operations, Tillie works to get solar panels up and running for homeowners as simply and quickly as possible. Our Solar Industry At Work Series shares the personal success of

129

Installing and Maintaining a Home Solar Electric System | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Installing and Maintaining a Home Solar Electric System Installing and Maintaining a Home Solar Electric System Installing and Maintaining a Home Solar Electric System July 2, 2012 - 8:21pm Addthis When choosing a contractor, ask about their work record, experience, and licenses, and get more than one bid for the installation of your PV system. | Photo courtesy of Dennis Schroeder, NREL. When choosing a contractor, ask about their work record, experience, and licenses, and get more than one bid for the installation of your PV system. | Photo courtesy of Dennis Schroeder, NREL. How does it work? Making sure your home solar electric or PV system is sized, sited, and installed correctly is essential for maximizing its energy performance. As with any mechanical or electrical appliance, PV systems require routine, periodic maintenance.

130

Operational test report for WESF diesel generator diesel tank installation  

Science Conference Proceedings (OSTI)

The WESF Backup Generator Underground Diesel Tank 101 has been replaced with a new above ground 1000 gallon diesel tank. Following the tank installation, inspections and tests specified in the Operational Test Procedure, WHC-SD-WM-OTP-155, were performed. Inspections performed by a Quality Control person indicated the installation was leak free and the diesel generator/engine ran as desired. There were no test and inspection exceptions, therefore, the diesel tank installation is operable.

Schwehr, B.A.

1994-08-02T23:59:59.000Z

131

Underground Transmission Cable System Construction and Installation Practices Manual  

Science Conference Proceedings (OSTI)

A reliable underground transmission line depends on reliable cable system manufacturing, design, construction, installation, and operation and maintenance. Construction and installation remain the most expensive component to implement. Recent advances in underground transmission have led to more demand for best practices and innovative ways to reduce construction and installation costs in a cable project. The Electric Power Research Institute (EPRI) has funded many projects over the years to improve the ...

2010-12-03T23:59:59.000Z

132

Underground Transmission Cable System Installation and Construction Practices Manual  

Science Conference Proceedings (OSTI)

Installation and construction remain the most expensive implementation components of underground transmission cable systems. Recent advancements in underground transmission have led to more demand for best practices and innovative ways to reduce installation and construction costs in a cable project. EPRI has funded many projects over the years to improve the efficiency and reduce the cost of underground transmission cable installation. Other organizations such as Association of Edison Illuminating Compa...

2009-12-22T23:59:59.000Z

133

Installing and Operating an Efficient Swimming Pool Pump | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

Water with an Efficient Swimming Pool Installing and Operating an Efficient Swimming Pool Pump Swimming Pool Covers An example of a solar pool heater. Solar Swimming Pool Heaters...

134

Installer Issues: Integrating Distributed Wind into Local Communities (Presentation)  

DOE Green Energy (OSTI)

A presentation for the WindPower 2006 Conference in Pittsburgh, PA, regarding the issues facing installer of small wind electric systems.

Green, J.

2006-06-01T23:59:59.000Z

135

Rhode Island Stormwater Design and Installation Standards Manual (Rhode  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rhode Island Stormwater Design and Installation Standards Manual Rhode Island Stormwater Design and Installation Standards Manual (Rhode Island) Rhode Island Stormwater Design and Installation Standards Manual (Rhode Island) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Rhode Island Program Type Environmental Regulations

136

Sensor Net: Nuclear Installation Intrusion Detection in/near Water ...  

Sensor Net: Nuclear Installation Intrusion Detection in/near Water ... Computational Sciences & Engineering Div Licensing Contact SIMS, DAVID L UT-Battelle, LLC

137

VisVIP: Installation Instructions for UNIX Source  

Science Conference Proceedings (OSTI)

... launches a Tcl/Tk process for the control menu. Thus you need a Tcl/Tk implementation installed on your system. exchanges ...

138

Electricity production and cooling energy savings from installation...  

NLE Websites -- All DOE Office Websites (Extended Search)

production and cooling energy savings from installation of a building-integrated photovoltaic roof on an office building Title Electricity production and cooling energy savings...

139

Livermore installs big data machine | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

installs big data machine | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response...

140

Shape the light, light the shape - lighting installation in performance.  

E-Print Network (OSTI)

??This thesis investigates the lighting design theory Light Inside Out, which is the technique of shaping light toward a creation of lighting installation in performance (more)

Yu, Lih-Hwa, 1972-

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "installation problems bullet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

DOE-DOD Emergency Backup Power Fuel Cell Installations  

Fuel Cell Technologies Publication and Product Library (EERE)

Ths fact sheet describes a collaboration between the departments of Energy and Defense to install and operate 18 fuel cell backup power systems across the United States.

142

Net Zero Energy Military Installations: A Guide to Assessment...  

NLE Websites -- All DOE Office Websites (Extended Search)

Net Zero Energy Military Installations: A Guide to Assessment and Planning Samuel Booth, John Barnett, Kari Burman, Josh Hambrick and Robert Westby Technical Report NREL...

143

Energy Saving 'Cool Roofs' Installed at Y-12 | National Nuclear...  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Saving 'Cool Roofs' Installed at Y-12 | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy...

144

Electric Vehicle Grid Integration for Sustainable Military Installations (Presentation)  

DOE Green Energy (OSTI)

This presentation discusses electric vehicle grid integration for sustainable military installations. Fort Carson Military Reservation in Colorado Springs is used as a case study.

Simpson, M.

2011-05-05T23:59:59.000Z

145

Installation package for Hyde Memorial Observatory, Lincoln, Nebraska  

DOE Green Energy (OSTI)

This report contains installation information for a solar heating system installed in Hyde Memorial Observatory at Lincoln, Nebraska. This package includes a system operation and maintenance manual, hardware brochures, schematics, system operating modes and drawings. The Solar Engineering and Equipment Company (SEECO) developed this prototype solar heating system, which consists of the following subsystems: solar collector, control, and storage.

Not Available

1978-12-01T23:59:59.000Z

146

Tracking the Sun II The Installed Cost of Photovoltaics  

E-Print Network (OSTI)

the Sun II Contents The Installed Cost of Photovoltaics in the U.S. from 1998-2008 Environmental Energy .................................................................... 10 4. PV Incentive and Net Installed Cost Trends ....................................... 24 5 Appendix A: Data Cleaning, Coding, and Standardization ....................... 33 Appendix B: Detailed

147

Performance Testing of Window Installation and Flashing Details  

E-Print Network (OSTI)

Protection of interface at windows and other penetrations from rainwater intrusion is a primary need of building structures. This is especially true when the building is in a high weather exposure location or in a climate in which the ability for walls to dry may be limited. Two areas of specific concern are: 1) the bottom corners of windows where damage is most commonly seen, and 2) the area around curved, arched or round-top windows where it is difficult to install the standard flashing materials. This paper reviews performance testing of window flashing installation methods commonly used in the trade, as well as improved methods made possible by recent advancements in flashing products. A series of laboratory tests were designed to determine water resistance, air leakage resistance and durability of several installation methods with different flashing materials. Windows were installed in test wall sections using several methods. The installations were monitored and evaluated for ease of installation and then tested for air leakage and water resistance using ASTM E283 and ASTM E331. The durability of the installations was then evaluated by subjecting the walls to thermal cycling (0 to 160oF) and retesting for water resistance using ASTM E331. Recommendations for best practice installation based on the testing results and key material selection issues are presented.

Weston, T. A.; Herrin, J.

2002-01-01T23:59:59.000Z

148

Design and installation package for solar hot water system  

DOE Green Energy (OSTI)

This report contains the design and installation procedure for the Solar Engineering and Manufacturing Company's solar hot water system. Included are the system performance specifications, system design drawings, hazard analysis and other information necessary to evaluate the design and instal the system.

Not Available

1978-12-01T23:59:59.000Z

149

Targeting Net Zero Energy for Military Installations (Presentation)  

Science Conference Proceedings (OSTI)

Targeting Net Zero Energy for Military Installations in Kaneohe Bay, Hawaii. A net zero energy installation (NZEI) is one that produces as much energy from on-site renewable sources as it consumes. NZEI assessment provides a systematic approach to energy projects.

Burman, K.

2012-05-01T23:59:59.000Z

150

Installation and Commissioning Automated Demand Response Systems  

Science Conference Proceedings (OSTI)

Demand Response (DR) can be defined as actions taken to reduce electric loads when contingencies, such as emergencies and congestion, occur that threaten supply-demand balance, or market conditions raise supply costs. California utilities have offered price and reliability DR based programs to customers to help reduce electric peak demand. The lack of knowledge about the DR programs and how to develop and implement DR control strategies is a barrier to participation in DR programs, as is the lack of automation of DR systems. Most DR activities are manual and require people to first receive notifications, and then act on the information to execute DR strategies. Levels of automation in DR can be defined as follows. Manual Demand Response involves a labor-intensive approach such as manually turning off or changing comfort set points at each equipment switch or controller. Semi-Automated Demand Response involves a pre-programmed demand response strategy initiated by a person via centralized control system. Fully-Automated Demand Response does not involve human intervention, but is initiated at a home, building, or facility through receipt of an external communications signal. The receipt of the external signal initiates pre-programmed demand response strategies. We refer to this as Auto-DR (Piette et. al. 2005). Auto-DR for commercial and industrial facilities can be defined as fully automated DR initiated by a signal from a utility or other appropriate entity and that provides fully-automated connectivity to customer end-use control strategies. One important concept in Auto-DR is that a homeowner or facility manager should be able to 'opt out' or 'override' a DR event if the event comes at time when the reduction in end-use services is not desirable. Therefore, Auto-DR is not handing over total control of the equipment or the facility to the utility but simply allowing the utility to pass on grid related information which then triggers facility defined and programmed strategies if convenient to the facility. From 2003 through 2006 Lawrence Berkeley National Laboratory (LBNL) and the Demand Response Research Center (DRRC) developed and tested a series of demand response automation communications technologies known as Automated Demand Response (Auto-DR). In 2007, LBNL worked with three investor-owned utilities to commercialize and implement Auto-DR programs in their territories. This paper summarizes the history of technology development for Auto-DR, and describes the DR technologies and control strategies utilized at many of the facilities. It outlines early experience in commercializing Auto-DR systems within PG&E DR programs, including the steps to configure the automation technology. The paper also describes the DR sheds derived using three different baseline methodologies. Emphasis is given to the lessons learned from installation and commissioning of Auto-DR systems, with a detailed description of the technical coordination roles and responsibilities, and costs.

Global Energy Partners; Pacific Gas and Electric Company; Kiliccote, Sila; Kiliccote, Sila; Piette, Mary Ann; Wikler, Greg; Prijyanonda, Joe; Chiu, Albert

2008-04-21T23:59:59.000Z

151

Models and Solution Approaches for Development and Installation of PEV Infrastructure  

E-Print Network (OSTI)

This dissertation formulates and develops models and solution approaches for plug-in electric vehicle (PEV) charging station installation. The models are formulated in the form of bilevel programming and stochastic programming problems, while a meta-heuristic method, genetic algorithm, and Monte Carlo bounding techniques are used to solve the problems. Demand for PEVs is increasing with the growing concerns about environment pollution, energy resources, and the economy. However, battery capacity in PEVs is still limited and represents one of the key barriers to a more widespread adoption of PEVs. It is expected that drivers who have long-distance commutes hesitate to replace their internal combustion engine vehicles with PEVs due to range anxiety. To address this concern, PEV infrastructure can be developed to provide re-fully status when they are needed. This dissertation is primarily focused on the development of mathematical models that can be used to support decisions regarding a charging station location and installation problem. The major parts of developing the models included identification of the problem, development of mathematical models in the form of bilevel and stochastic programming problems, and development of a solution approach using a meta-heuristic method. PEV parking building problem was formulated as a bilevel programming problem in order to consider interaction between transportation flow and a manager decisions, while the charging station installation problem was formulated as a stochastic programming problem in order to consider uncertainty in parameters. In order to find the best-quality solution, a genetic algorithm method was used because the formulation problems are NP-hard. In addition, the Monte Carlo bounding method was used to solve the stochastic program with continuous distributions. Managerial implications and recommendations for PEV parking building developers and managers were suggested in terms of sensitivity analysis. First, in the planning stage, the developer of the PEV parking building should consider long-term changes in future traffic flow and locate a PEV parking building closer to the node with the highest destination trip rate. Second, to attract more parking users, the operator needs to consider the walkability of walking links.

Kim, Seok

2011-12-01T23:59:59.000Z

152

Would You Consider Installing a Cool Roof? | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Would You Consider Installing a Cool Roof? Would You Consider Installing a Cool Roof? Would You Consider Installing a Cool Roof? August 12, 2010 - 7:30am Addthis On Monday, Erin discussed cool roof technologies and how they can improve the comfort of buildings while reducing energy costs. Would you consider installing a cool roof? Why or why not? Each Thursday, you have the chance to share your thoughts on a question about energy efficiency or renewable energy for consumers. Please comment with your answers, and also feel free to respond to other comments. E-mail your responses to the Energy Saver team at consumer.webmaster@nrel.gov. Addthis Related Articles Would You Consider Driving a Vehicle that Can Run on Biodiesel? Would You Consider Installing a Cool Roof? Tips: Energy-Efficient Roofs How Do You Save Water When Caring for Your Lawn?

153

Permit for Charging Equipment Installation: Electric Vehicle Supply Equipment (EVSE)  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Compliance with the following permit will allow the installation and operation of electric vehicle charging equipment at a Compliance with the following permit will allow the installation and operation of electric vehicle charging equipment at a residence in the City, State jurisdiction. This permit addresses one of the following situations: Only an additional branch circuit would be added at the residence A hard-wired charging station would be installed at the residence. The attached requirements for wiring the charging station are taken directly out of the 2011 edition of the National Electrical Code (NEC) NFPA 70, Article 625 Electric Vehicle Charging System. This article does not provide all of the information necessary for the installation of electric vehicle charging equipment. Please refer to the current edition of the electrical code adopted by the local jurisdiction for additional installation requirements. Reference to the 2011 NEC may be

154

Secretary Chu Announces Two Million Smart Grid Meters Installed Nationwide  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Two Million Smart Grid Meters Installed Two Million Smart Grid Meters Installed Nationwide Secretary Chu Announces Two Million Smart Grid Meters Installed Nationwide August 31, 2010 - 12:00am Addthis Columbus, OH - At an event today at Battelle headquarters in Columbus, Ohio, U.S. Energy Secretary Steven Chu announced that two million smart grid meters have been installed across the country, helping to reduce energy costs for families and businesses. As a result of funding from the Recovery Act, smart grid technology is speeding the modernization of the nation's electrical grid, helping to reduce the amount of time needed to respond to energy disruptions and enable consumers to monitor their energy consumption and costs. So far, more than 180,000 smart meters have been installed in Ohio. "As a result of an unprecedented investment from the Recovery Act, smart

155

ARRA Program Celebrates Milestone 600,000 Smart Meter Installations |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ARRA Program Celebrates Milestone 600,000 Smart Meter Installations ARRA Program Celebrates Milestone 600,000 Smart Meter Installations ARRA Program Celebrates Milestone 600,000 Smart Meter Installations April 17, 2012 - 3:09pm Addthis On April 11, 2012, DOE Recovery Act funding recipient Sacramento Municipal Utility District (SMUD) celebrated a major milestone in the development of a regional smart grid in California: the installation of over 600,000 smart meters. For the event, Congresswoman Doris Matsui (D-Sacramento) visited SMUD's customer service center and praised the program for implementing a system "that will be more efficient, more reliable, and better for consumers." SMUD's meter installations are nearly complete, with only a few thousand remaining. In addition to smart meters, SMUD's grid modernization efforts will include automated distribution systems, a

156

Solar, Wind, Hydropower: Home Renewable Energy Installations | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar, Wind, Hydropower: Home Renewable Energy Installations Solar, Wind, Hydropower: Home Renewable Energy Installations Solar, Wind, Hydropower: Home Renewable Energy Installations April 17, 2013 - 1:44pm Addthis This Lakewood, Colorado home was built in 1956. Brent and Mo Nelson upgraded the home with multiple solar technologies including; daylighting, passive solar and active solar. They also have an 80 gallon solar hot water heater. | Photo by Dennis Schroeder, National Renewable Energy Laboratory. This Lakewood, Colorado home was built in 1956. Brent and Mo Nelson upgraded the home with multiple solar technologies including; daylighting, passive solar and active solar. They also have an 80 gallon solar hot water heater. | Photo by Dennis Schroeder, National Renewable Energy Laboratory. Homeowner Andrea Mitchel, with installer Joe Guasti, proudly shows off small wind turbine installed in Oak Hills, CA. | Photo by Karin Sinclair, National Renewable Energy Laboratory.

157

WINDOW 5 Glass Library Update  

NLE Websites -- All DOE Office Websites (Extended Search)

WINDOW 6 or 7 Glass Library Update WINDOW 6 or 7 Glass Library Update Last update:12/09/13 07:26 PM Automatic IGDB Update Feature in WINDOW 6 and 7 The latest versions of WINDOW 6 and 7 have an automatic IGDB database update function in the Glass Library. When you first open the program, it checks to see if there is an IGDB version later than what you already have installed, and will notify you if there is an update. Then you can download and install the IGDB database, and click on the Update IGDB button in the Glass Library in order to start the automatic update. For older versions of WINDOW 6 and 7 without the automatic IGDB update function bullet How to Check the Current WINDOW5 IGDB Version bullet Updating the Glass Library bullet Problem Updating the Glass Library bullet Discontinued Records or Reused NFRC IDs

158

Preliminary assessment report for Fort Jacob F. Wolters, Installation 48555, Mineral Wells, Texas. Installation Restoration Program  

SciTech Connect

This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard (TXARNG) property near Mineral Wells, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Fort Wolters property, the requirement of the Department of Defense Installation Restoration Program.

Dennis, C.B.

1993-08-01T23:59:59.000Z

159

Preliminary assessment report for Waiawa Gulch, Installation 15080, Pearl City, Oahu, Hawaii. Installation Restoration Program  

SciTech Connect

This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Hawaii Army National Guard (HIARNG) property near Pearl City, Oahu, Hawaii. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Waiawa Gulch property, phase I of the Department of Defense Installation Restoration Program (IRP).

Not Available

1993-08-01T23:59:59.000Z

160

Oklahoma Tribe to Install Solar Roof | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oklahoma Tribe to Install Solar Roof Oklahoma Tribe to Install Solar Roof Oklahoma Tribe to Install Solar Roof March 22, 2010 - 6:10pm Addthis Stephen Graff Former Writer & editor for Energy Empowers, EERE What does this project do? The new fully functioning roof and solar energy production plant will save the tribe about $20,000 a year. The Delaware Nation, a federally-recognized tribe of about 1,400 people in Anadarko, Okla., will install solar panel roofs on two tribal government buildings as part of a larger effort to become more sustainable and bring new jobs to an area struggling with high unemployment. "It's the start of a green initiative," says Theda McPheron-Keel, president of Wind Hollow Foundation, a nonprofit organization aimed at helping American Indians improve their lives. "It provides economic

Note: This page contains sample records for the topic "installation problems bullet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Carpe Diem: Install Insulated Roman Shades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Carpe Diem: Install Insulated Roman Shades Carpe Diem: Install Insulated Roman Shades Carpe Diem: Install Insulated Roman Shades March 16, 2010 - 11:44am Addthis John Lippert As I mentioned in yesterday's blog, I had insulated window quilts installed on most of my home's windows. I should have bought window quilts for all of our windows, but I refrained from doing so on two downstairs windows to save money (which, in the long run, I didn't). There were window shades already there; they didn't do much from a thermal perspective, but they did provide privacy and room darkening. Well, they need to be replaced now, and I'm looking again at high efficiency thermal window shades. This time I'm considering thermal Roman shades. About a dozen years ago my wife and I went on the Tour of Solar Homes, the local component of the annual National Solar Tour sponsored by the American

162

Hawaii Marine Base Installs Solar Roofs | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marine Base Installs Solar Roofs Marine Base Installs Solar Roofs Hawaii Marine Base Installs Solar Roofs April 2, 2010 - 2:42pm Addthis Lorelei Laird Writer, Energy Empowers What does this project do? Marine Corps Base Hawaii replaced roofs on two buildings with polyvinyl chloride membrane 'cool' roofs and solar panels. The new roofs saves $20,000 a year in energy costs. Built on the end of the Mokapu Peninsula on Oahu's northeast coast, the Marine Corps Base Hawaii (MCBH) at Kaneohe Bay gets plenty of sunlight. But harnessing that sunlight to create renewable electricity was considered too expensive to be practical - until 2008. That's when MCBH took advantage of planned maintenance funding to help offset the high cost of installing photovoltaic panels on the base. As a military entity, MCBH can't directly take advantage of federal or state

163

Home Solar Installations: Things to Consider | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Home Solar Installations: Things to Consider Home Solar Installations: Things to Consider Home Solar Installations: Things to Consider May 29, 2013 - 3:18pm Addthis Home solar systems can save you energy and money. | Photo courtesy of Dennis Schroeder, NREL 22168. Home solar systems can save you energy and money. | Photo courtesy of Dennis Schroeder, NREL 22168. Erin Connealy Communications Specialist, Office of Energy Efficiency and Renewable Energy How can I participate? Read these considerations for installing a home solar electric system to evaluate whether it is a good choice for your home. Well, it's that time of year! Days are getting longer and the weather is getting warmer. How can you take advantage of longer sunlight hours? Dinner on your porch might be one good solution, but an even better one might be

164

Secretary Chu Announces Two Million Smart Grid Meters Installed...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

needed to respond to energy disruptions and enable consumers to monitor their energy consumption and costs. So far, more than 180,000 smart meters have been installed in Ohio. "As...

165

Valuation of potash reserves at the Waste Installation Pilot Plant  

Science Conference Proceedings (OSTI)

Monte Carlo simulation was used in conjunction with several random walk price and cost models to value potash reserves at the Waste Installation Pilot Plant (WIPP) site new Carlsbad, New Mexico. Selection of market price and product processing cost models ...

Peter C. Anselmo

1996-11-01T23:59:59.000Z

166

Vet's company installing solar across Massachusetts | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Vet's company installing solar across Massachusetts Vet's company installing solar across Massachusetts Vet's company installing solar across Massachusetts February 25, 2010 - 4:09pm Addthis Dan Leary, a U.S. Army veteran, is president of Nexamp Inc., a clean energy company that specializes in solar installation. Dan founded the company in 2006 and has witnessed its impressive growth from six employees to 65 and counting as of July 2010. The small company recently reached a significant milestone - it was awarded one of the largest solar contracts in Massachusetts. Dan served in the military for seven years, reaching the rank of captain in the Army. He says his idea for a clean energy company came in 2005 when he was pursuing his M.B.A while serving in Kuwait. "For my final project, I wrote a business plan for a clean energy

167

Portland Advancing Green Image With Solar Installs | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Portland Advancing Green Image With Solar Installs Portland Advancing Green Image With Solar Installs Portland Advancing Green Image With Solar Installs February 22, 2010 - 12:10pm Addthis Laura Smoyer checks the net-metering device in her home, which now uses the sun for about 38 percent of its total energy use. | Department of Energy Photo | Laura Smoyer checks the net-metering device in her home, which now uses the sun for about 38 percent of its total energy use. | Department of Energy Photo | Joshua DeLung A quick Web search reveals that many sources consider Portland, Ore., to be one of the most green-minded cities in the United States. But large upfront costs have been a barrier for citizens looking to install solar power systems in the past. Now, a neighborhood solar initiative is helping communities organize to get solar discounts, meaning the city could become

168

Hawaii Marine Base Installs Solar Roofs | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hawaii Marine Base Installs Solar Roofs Hawaii Marine Base Installs Solar Roofs Hawaii Marine Base Installs Solar Roofs April 2, 2010 - 2:42pm Addthis Lorelei Laird Writer, Energy Empowers What does this project do? Marine Corps Base Hawaii replaced roofs on two buildings with polyvinyl chloride membrane 'cool' roofs and solar panels. The new roofs saves $20,000 a year in energy costs. Built on the end of the Mokapu Peninsula on Oahu's northeast coast, the Marine Corps Base Hawaii (MCBH) at Kaneohe Bay gets plenty of sunlight. But harnessing that sunlight to create renewable electricity was considered too expensive to be practical - until 2008. That's when MCBH took advantage of planned maintenance funding to help offset the high cost of installing photovoltaic panels on the base. As a military entity, MCBH can't directly take advantage of federal or state

169

Energy Department Completes Cool Roof Installation on DC Headquarters  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Completes Cool Roof Installation on DC Completes Cool Roof Installation on DC Headquarters Building to Save Money by Saving Energy Energy Department Completes Cool Roof Installation on DC Headquarters Building to Save Money by Saving Energy December 14, 2010 - 12:00am Addthis Washington - Secretary Steven Chu today announced the completion of a new cool roof installation on the Department of Energy's Headquarters West Building. There was no incremental cost to adding the cool roof as part of the roof replacement project and it will save taxpayers $2,000 every year in building energy costs. Cool roofs use lighter-colored roofing surfaces or special coatings to reflect more of the sun's heat, helping improve building efficiency, reduce cooling costs and offset carbon emissions. The cool roof and increased insulation at the facility were

170

Energy Secretary Chu Announces Five Million Smart Meters Installed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Announces Five Million Smart Meters Installed Announces Five Million Smart Meters Installed Nationwide as Part of Grid Modernization Effort Energy Secretary Chu Announces Five Million Smart Meters Installed Nationwide as Part of Grid Modernization Effort June 13, 2011 - 12:00am Addthis Washington, DC - At a White House Grid Modernization event today, U.S. Department of Energy Secretary Steven Chu announced that more than five million smart meters have been installed nationwide as part of Recovery Act-funded efforts to accelerate modernization of the Nation's electric grid. Smart meters will provide utility companies with greater information about how much electricity is being used throughout their service areas. They will also give consumers access to real-time information about their energy consumption, allowing them to make well-informed decisions about how

171

Newly Installed Alaska North Slope Well Will Test Innovative Hydrate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Newly Installed Alaska North Slope Well Will Test Innovative Newly Installed Alaska North Slope Well Will Test Innovative Hydrate Production Technologies Newly Installed Alaska North Slope Well Will Test Innovative Hydrate Production Technologies May 17, 2011 - 1:00pm Addthis Washington, DC - A fully instrumented well that will test innovative technologies for producing methane gas from hydrate deposits has been safely installed on the North Slope of Alaska. As a result, the "Iġnik Sikumi" (Iñupiaq for "fire in the ice") gas hydrate field trial well will be available for field experiments as early as winter 2011-12. The well, the result of a partnership between ConocoPhillips and the Office of Fossil Energy's (FE) National Energy Technology Laboratory, will test a technology that involves injecting carbon dioxide (CO2) into sandstone

172

Property:Project Installed Capacity (MW) | Open Energy Information  

Open Energy Info (EERE)

Installed Capacity (MW) Installed Capacity (MW) Jump to: navigation, search Property Name Project Installed Capacity (MW) Property Type String Pages using the property "Project Installed Capacity (MW)" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects/40MW Lewis project + 0 + MHK Projects/ADM 5 + 1 + MHK Projects/AWS II + 1 + MHK Projects/Admirality Inlet Tidal Energy Project + 22 + MHK Projects/Agucadoura + 2 + MHK Projects/Alaska 18 + 10 + MHK Projects/Alaska 36 + 10 + MHK Projects/Algiers Cutoff Project + 16 + MHK Projects/Algiers Light Project + 0 + MHK Projects/Anconia Point Project + 0 + MHK Projects/Ashley Point Project + 0 + MHK Projects/Astoria Tidal Energy + 300 + MHK Projects/Avondale Bend Project + 0 + MHK Projects/Bar Field Bend + 0 +

173

Oklahoma Tribe to Install Solar Roof | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oklahoma Tribe to Install Solar Roof Oklahoma Tribe to Install Solar Roof Oklahoma Tribe to Install Solar Roof March 22, 2010 - 6:10pm Addthis Stephen Graff Former Writer & editor for Energy Empowers, EERE What does this project do? The new fully functioning roof and solar energy production plant will save the tribe about $20,000 a year. The Delaware Nation, a federally-recognized tribe of about 1,400 people in Anadarko, Okla., will install solar panel roofs on two tribal government buildings as part of a larger effort to become more sustainable and bring new jobs to an area struggling with high unemployment. "It's the start of a green initiative," says Theda McPheron-Keel, president of Wind Hollow Foundation, a nonprofit organization aimed at helping American Indians improve their lives. "It provides economic

174

Portland Advancing Green Image With Solar Installs | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Portland Advancing Green Image With Solar Installs Portland Advancing Green Image With Solar Installs Portland Advancing Green Image With Solar Installs February 22, 2010 - 12:10pm Addthis Laura Smoyer checks the net-metering device in her home, which now uses the sun for about 38 percent of its total energy use. | Department of Energy Photo | Laura Smoyer checks the net-metering device in her home, which now uses the sun for about 38 percent of its total energy use. | Department of Energy Photo | Joshua DeLung A quick Web search reveals that many sources consider Portland, Ore., to be one of the most green-minded cities in the United States. But large upfront costs have been a barrier for citizens looking to install solar power systems in the past. Now, a neighborhood solar initiative is helping communities organize to get solar discounts, meaning the city could become

175

Home Solar Installations: Things to Consider | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Home Solar Installations: Things to Consider Home Solar Installations: Things to Consider Home Solar Installations: Things to Consider May 29, 2013 - 3:18pm Addthis Home solar systems can save you energy and money. | Photo courtesy of Dennis Schroeder, NREL 22168. Home solar systems can save you energy and money. | Photo courtesy of Dennis Schroeder, NREL 22168. Erin Connealy Communications Specialist, Office of Energy Efficiency and Renewable Energy How can I participate? Read these considerations for installing a home solar electric system to evaluate whether it is a good choice for your home. Well, it's that time of year! Days are getting longer and the weather is getting warmer. How can you take advantage of longer sunlight hours? Dinner on your porch might be one good solution, but an even better one might be

176

Property:EZFeed/InstalledCapacity | Open Energy Information  

Open Energy Info (EERE)

InstalledCapacity InstalledCapacity Jump to: navigation, search Property Name EZFeed/InstalledCapacity Property Type String Description EZFeed Installed Capacity property Subproperties This property has the following 6079 subproperties: 2 2003 Climate Change Fuel Cell Buy-Down Program (Federal) 3 30% Business Tax Credit for Solar (Vermont) 4 401 Certification (Vermont) A AEP (Central and North) - CitySmart Program (Texas) AEP (Central and North) - Residential Energy Efficiency Programs (Texas) AEP (Central and SWEPCO) - Coolsaver A/C Tune Up (Texas) AEP (Central, North and SWEPCO) - Commercial Solutions Program (Texas) AEP (SWEPCO) - Residential Energy Efficiency Programs (Texas) AEP Appalachian Power - Commercial and Industrial Rebate Programs (West Virginia) AEP Appalachian Power - Residential Home Retrofit Program (West Virginia)

177

Obama Administration Announces Plans to Install New Solar Panels...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

By installing solar panels on their homes, consumers are able to effectively lock in the price of electricity they will pay in the years ahead, acting as an insulator against...

178

NREL: Wind Research - White Earth Nation Installs Turbines: A...  

NLE Websites -- All DOE Office Websites (Extended Search)

White Earth Nation Installs Turbines: A Wind Powering America Success Story February 11, 2013 Almost 8 years after taking the initial steps to harness the wind, the White Earth...

179

Milwaukee Installer Reflects on His Career In Solar | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

An Interview with the CEO of Helios Solar Works Milwaukee solar installers putting in a rooftop solar energy system on Dr. Paula Papanek's home. | Photo courtesy of Dr. Paula...

180

Energy Department Launches SunShot Prize Competition to Install...  

NLE Websites -- All DOE Office Websites (Extended Search)

the start of a new competition to make it faster, easier, and cheaper to install rooftop solar energy systems. The SunShot Prize makes a total of 10 million in cash...

Note: This page contains sample records for the topic "installation problems bullet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

OpenEI/PageKeyword Solar Installations | Open Energy Information  

Open Energy Info (EERE)

Data Special page Share this page on Facebook icon Twitter icon OpenEIPageKeyword Solar Installations Jump to: navigation, search A list of all pages that have property...

182

North Shore Gas Single Family Direct Install (Illinois)  

Energy.gov (U.S. Department of Energy (DOE))

Owners of single-family homes, condos, townhomes and two-flats may be eligible for a free installation of new programmable thermostats, pipe insulation, showerheads, and faucet aerators through...

183

Seeing solar on campus : a visible photovoltaic installation on campus  

E-Print Network (OSTI)

This paper presents a methodology for selecting a site on the MIT campus for a visible solar photovoltaic installation. Visibility, solar exposure, advertising potential, aesthetics, interactivity and direct or important ...

Guarda, Daniel Jair Alves

2006-01-01T23:59:59.000Z

184

DOE-DOD Emergency Backup Power Fuel Cell Installations  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE-DOD Emergency Backup Power Fuel Cell Installations On July 19, 2011, the U.S. Department of Energy (DOE) announced that, as part of an interagency partnership with the U.S....

185

National sales trends: what's up, what's down. [Active solar energy installations  

SciTech Connect

In 1981, active solar systems generated sales of about $600 million nationwide. However, by the fourth quarter the recession was beginning to affect the industry. During 1982 many dealers and installers went out of business. Modest growth in sales was seen in large volume installers who have been in business for a long time and who have overcome credibility problems. The industry believes that long-term growth will require continuation of tax incentives, effective consumer financing techniques and heightened public awareness of solar energy. (JMT)

Mihlmester, P.; Bernstein, H.

1982-12-01T23:59:59.000Z

186

Renewable Energy Opportunities at the Kanto Installations, Japan  

DOE Green Energy (OSTI)

This document provides an overview of renewable resource development potential at the U.S. Army installations in the Kanto region in Japan, which includes Camp Zama, Yokohama North Dock, Sagamihara Family Housing Area (SFHA), Sagami General Depot, and Akasaka Press Center. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the Huntsville Army Corps of Engineers, and includes the development of a methodology for renewable resource assessment at Army installations located on foreign soil. The methodology is documented in Renewable Energy Assessment Methodology for Japanese OCONUS Army Installations. The site visit to the Kanto installations took place on April 5 and 6, 2010. At the current time, there are some renewable technologies that show economic potential. Because of siting restrictions and the small size of these installations, development of most renewable energy technologies will likely be limited to Camp Zama. Project feasibility is based on installation-specific resource availability and energy costs and projections based on accepted life-cycle cost methods. Development of any renewable energy project will be challenging, as it will require investigation into existing contractual obligations, new contracts that could be developed, the legality of certain partnerships, and available financing avenues, which involves the U.S. Forces Japan (USFJ), the Government of Japan (GOJ), and a number of other parties on both sides. The Army will not be able to implement a project without involvement and approval from the other services and multiple levels of Japanese government. However, implementation of renewable energy projects could be an attractive method for GOJ to reduce greenhouse gas emissions and lower annual utility payments to USFJ. This report recommends projects to pursue and offers approaches to use. The most promising opportunities include waste-to-energy and ground source heat pumps. Solar photovoltaics (PV) may also prove successful. Other resources were found to be insufficient on the Kanto installations.

Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.; Gorrissen, Willy J.; Kora, Angela R.; Weimar, Mark R.; Hand, James R.; Orrell, Alice C.; Williamson, Jennifer L.

2010-09-24T23:59:59.000Z

187

Analysis and Interpretation of Hard X-ray Emission fromthe Bullet Cluster (1E0657-56), the Most Distant Cluster of Galaxies Observed by the RXTE  

Science Conference Proceedings (OSTI)

Evidence for non-thermal activity in clusters of galaxies is well established from radio observations of synchrotron emission by relativistic electrons. New windows in the Extreme Ultraviolet and Hard X-ray ranges have provided for more powerful tools for the investigation of this phenomenon. Detection of hard X-rays in the 20 to 100 keV range have been reported from several clusters of galaxies, notably from Coma and others. Based on these earlier observations we identified the relatively high redshift cluster 1E0657-56 (also known as RX J0658-5557) as a good candidate for hard X-ray observations. This cluster, also known as the bullet cluster, has many other interesting and unusual features, most notably that it is undergoing a merger, clearly visible in the X-ray images. Here we present results from a successful RXTE observations of this cluster. We summarize past observations and their theoretical interpretation which guided us in the selection process. We describe the new observations and present the constraints we can set on the flux and spectrum of the hard X-rays. Finally we discuss the constraints one can set on the characteristics of accelerated electrons which produce the hard X-rays and the radio radiation.

Petrosian, Vahe; /Stanford U., Phys. Dept. /SLAC /Stanford U., Appl. Phys. Dept.; Madejski, Greg; /SLAC; Luli, Kevin; /Stanford U., Phys. Dept.

2006-08-16T23:59:59.000Z

188

Stakeholder Engagement and Outreach: U.S. Installed Wind Capacity  

Wind Powering America (EERE)

Education Education Printable Version Bookmark and Share Learn About Wind About Wind Power Locating Wind Power Getting Wind Power Installed Wind Capacity Wind for Schools Project Collegiate Wind Competition School Project Locations Education & Training Programs Curricula & Teaching Materials Resources Installed Wind Capacity This page has maps of the United States that show installed wind capacity by state and its progression. This map shows the installed wind capacity in megawatts. As of September 30, 2012, 51,630 MW have been installed. Alaska, 16 MW; Hawaii, 112 MW; Washington, 2,699 MW; Oregon, 3,153 MW; California, 4,570 MW; Nevada, 152; Idaho, 675 MW; Utah, 325 MW; Arizona, 238 MW; Montana, 395 MW; Wyoming, 1,410 MW; Colorado, 1,805 MW; New Mexico, 778 MW; North Dakota, 1,469 MW; South Dakota, 784 MW; Nebraska, 337 MW; Kansas, 1,877 MW; Oklahoma, 2,400 MW; Texas, 10,929 MW; Minnesota, 2,717 MW; Iowa, 4,536 MW; Missouri, 459 MW; Wisconsin, 636 MW; Illinois, 3,055 MW; Tennessee, 29 MW; Michigan, 515 MW; Indiana, 1,343 MW; Ohio, 420 MW; West Virginia, 583 MW; Pennsylvania, 1,029 MW; Maryland, 120 MW; Delaware, 2 MW; New Jersey, 9 MW; New York, 1,418 MW; Vermont, 46 MW; New Hampshire, 125 MW; Massachusetts, 64 MW; Rhode Island, 3 MW; Maine, 397 MW.

189

New England Breeze Solar and Wind Installers | Open Energy Information  

Open Energy Info (EERE)

Breeze Solar and Wind Installers Breeze Solar and Wind Installers Jump to: navigation, search Logo: New England Breeze Solar and Wind Installers Name New England Breeze Solar and Wind Installers Place Hudson, Massachusetts Zip 01749 Sector Renewable energy, Services, Solar, Wind energy Product Solar Panel and Wind Turbine Installation Year founded 2006 Number of employees 1-10 Phone number 978-567-9463 Website http://www.NewEnglandBreeze.co Coordinates 42.3917598°, -71.5661769° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.3917598,"lon":-71.5661769,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

190

Renewable Energy Assessment Methodology for Japanese OCONUS Army Installations  

DOE Green Energy (OSTI)

Since 2005, Pacific Northwest National Laboratory (PNNL) has been asked by Installation Management Command (IMCOM) to conduct strategic assessments at selected US Army installations of the potential use of renewable energy resources, including solar, wind, geothermal, biomass, waste, and ground source heat pumps (GSHPs). IMCOM has the same economic, security, and legal drivers to develop alternative, renewable energy resources overseas as it has for installations located in the US. The approach for continental US (CONUS) studies has been to use known, US-based renewable resource characterizations and information sources coupled with local, site-specific sources and interviews. However, the extent to which this sort of data might be available for outside the continental US (OCONUS) sites was unknown. An assessment at Camp Zama, Japan was completed as a trial to test the applicability of the CONUS methodology at OCONUS installations. It was found that, with some help from Camp Zama personnel in translating and locating a few Japanese sources, there was relatively little difficulty in finding sources that should provide a solid basis for conducting an assessment of comparable depth to those conducted for US installations. Project implementation will likely be more of a challenge, but the feasibility analysis will be able to use the same basic steps, with some adjusted inputs, as PNNLs established renewable resource assessment methodology.

Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.; Gorrissen, Willy J.; Kora, Angela R.; Weimar, Mark R.; Hand, James R.; Orrell, Alice C.; Williamson, Jennifer L.

2010-08-30T23:59:59.000Z

191

Reducing the cost of top-drive installation  

Science Conference Proceedings (OSTI)

To equip an older jackup, the Offshore Mercury, with a completely workable and reliable top drive at minimum cost and without sacrificing performance, Sonat Offshore Drilling installed a power-swivel drilling system that did not require heightening or strengthening the derrick. An electronic crown protection system was installed to allow the driller use of all available reduced crown clearance, thereby increasing drilling safety by reducing the probability of accidentally running the traveling block into the crown. In addition, they modified the DC-DC drilling power equipment to create a completely functional and low-cost alternative to installing additional AC power-generating capacity and an SCR system. When planning a cost-effective top-drive installation on the Offshore Mercury, they recognized that the rig did not fit the average jackup profile: It has a DC-DC electric power drilling system and only a 140-ft (43-m) derrick, rather than the more common SCR system and 147-ft (45-m) derrick. From costs studies made up to the middle of 1991, they believed they could save a significant amount if it were possible to install and use a top drive in a 147-ft (45-m) or even a 140-ft (43-m) derrick without having to extend and strengthen the derrick. This paper reviews the design of this system and the effectiveness of its performance.

Hock, C.J. (Sonat Offshore Drilling Inc., Houston, TX (United States))

1993-09-01T23:59:59.000Z

192

NSTAR (Electric) - Small Business Direct Install Program | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NSTAR (Electric) - Small Business Direct Install Program NSTAR (Electric) - Small Business Direct Install Program NSTAR (Electric) - Small Business Direct Install Program < Back Eligibility Commercial Local Government Nonprofit State Government Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Other Home Weatherization Commercial Weatherization Sealing Your Home Ventilation Manufacturing Heat Pumps Appliances & Electronics Commercial Lighting Lighting Program Info State Massachusetts Program Type Utility Rebate Program Rebate Amount Up to 70% of the total project cost Provider NSTAR The NSTAR Small Business Solutions Program offers incentives for business customers whose average monthly demand is 300 kW or less. The first step of the program is a free energy audit to identify potential energy saving

193

Ohio Town Installing 'Green' Traffic Signals | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ohio Town Installing 'Green' Traffic Signals Ohio Town Installing 'Green' Traffic Signals Ohio Town Installing 'Green' Traffic Signals January 20, 2010 - 3:57pm Addthis Elyria, Ohio, is getting a little greener. Mayor William M. Grace recently confirmed that staff will replace traditional traffic lights with 288 energy-efficient LEDs (light-emitting diodes), saving the town energy and money. "We are definitely doing this, we are going to switch out all the traffic lights in town," Elyria's mayor says. Replacing light bulbs with LEDs will mean substantial savings. That's because these small, solid bulbs can last up to 10 times longer than traditional lights and require considerably less energy. "This gives us the opportunity to change, we expect to realize considerable savings," the mayor says.

194

Installing a Light Source 'Racetrack' | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Installing a Light Source 'Racetrack' Installing a Light Source 'Racetrack' Installing a Light Source 'Racetrack' March 22, 2011 - 10:42am Addthis Brookhaven National Lab's NSLS II Construction Site | Photo Courtesy of Brookhaven National Lab Brookhaven National Lab's NSLS II Construction Site | Photo Courtesy of Brookhaven National Lab Kendra Snyder This month, workers at Brookhaven National Laboratory's National Synchrotron Light Source II (NSLS-II), the half-mile electron racetrack for one of the world's most advanced light sources, will begin filling the facility's steel and concrete shell. In 2015, NSLS-II will open its doors - and its ultra-bright beams of x-ray, infrared and ultraviolet light - to thousands of researchers around the world, enabling the detailed exploration of everything from

195

NREL: Technology Transfer - White Earth Nation Installs Turbines: A Wind  

NLE Websites -- All DOE Office Websites (Extended Search)

White Earth Nation Installs Turbines: A Wind Powering America Success Story White Earth Nation Installs Turbines: A Wind Powering America Success Story February 11, 2013 Almost 8 years after taking the initial steps to harness the wind, the White Earth Nation recently completed the installation of two small wind turbines that will help offset energy costs for Minnesota's largest and most populous Native American reservation. Mike Triplett, economic development planner with the White Earth Development Office, believes that the project represents a unique opportunity for tribal entities in the United States. He noted that tribes don't qualify for tax-based incentives. "And as for working with investors, we never found that to be a viable option," Triplett said. "So we've relied heavily on grants." Funded through nearly $1.8 million in congressional appropriations along

196

Install renewable energy systems | ENERGY STAR Buildings & Plants  

NLE Websites -- All DOE Office Websites (Extended Search)

Install renewable energy systems Install renewable energy systems Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In this section Learn the benefits Get started Use Portfolio Manager Save energy Stamp out energy waste Find cost-effective investments Engage occupants Purchase energy-saving products Put computers to sleep Get help from an expert Take a comprehensive approach Install renewable energy systems

197

Pasadena Water and Power - Solar Power Installation Rebate | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pasadena Water and Power - Solar Power Installation Rebate Pasadena Water and Power - Solar Power Installation Rebate Pasadena Water and Power - Solar Power Installation Rebate < Back Eligibility Commercial Institutional Local Government Nonprofit Residential State Government Savings Category Solar Buying & Making Electricity Program Info State California Program Type Utility Rebate Program Rebate Amount Systems up to 30 kW have the option of receiving an expected performance based buydown (EPBB) or a performance based incentive (PBI). Systems larger than 30 kW are only eligible for the PBI. EPBB (effective 6/1/12): Residential: $1.40/watt AC Commercial and all PPAs: $0.85/watt AC Non-profits and Government: $1.60/watt AC Income-qualified residential: $4.00/watt PBI (effective 6/1/12): Residential: $0.212/kWh Commercial and all PPAs: $0.129/kWh

198

Installing and Operating an Efficient Swimming Pool Pump | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Installing and Operating an Efficient Swimming Pool Pump Installing and Operating an Efficient Swimming Pool Pump Installing and Operating an Efficient Swimming Pool Pump May 29, 2012 - 7:54pm Addthis Photo courtesy iStockphoto.com Photo courtesy iStockphoto.com What does this mean for me? Use the smallest size pump possible for your swimming pool. Reduce the time your pool pump operates to save money while still keeping your pool clean. You can save energy and maintain a comfortable swimming pool temperature by using a smaller, higher efficiency pump and by operating it less. In a study of 120 pools by the Center for Energy Conservation at Florida Atlantic University, some pool owners saved as much as 75% of their original pumping bill when they used these energy conservation measures (see table below). Table 1. Savings from Pump Conservation Measures

199

Installing a Light Source 'Racetrack' | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Installing a Light Source 'Racetrack' Installing a Light Source 'Racetrack' Installing a Light Source 'Racetrack' March 22, 2011 - 10:42am Addthis Brookhaven National Lab's NSLS II Construction Site | Photo Courtesy of Brookhaven National Lab Brookhaven National Lab's NSLS II Construction Site | Photo Courtesy of Brookhaven National Lab Kendra Snyder This month, workers at Brookhaven National Laboratory's National Synchrotron Light Source II (NSLS-II), the half-mile electron racetrack for one of the world's most advanced light sources, will begin filling the facility's steel and concrete shell. In 2015, NSLS-II will open its doors - and its ultra-bright beams of x-ray, infrared and ultraviolet light - to thousands of researchers around the world, enabling the detailed exploration of everything from

200

Nevada manufacturer installing geothermal power plant | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nevada manufacturer installing geothermal power plant Nevada manufacturer installing geothermal power plant Nevada manufacturer installing geothermal power plant August 26, 2010 - 4:45pm Addthis Chemetall extracts lithium carbonate, a powder, from brine, a salty solution from within the earth. | Photo courtesy Chemetall Chemetall extracts lithium carbonate, a powder, from brine, a salty solution from within the earth. | Photo courtesy Chemetall Joshua DeLung Chemetall supplies materials for lithium-ion batteries for electric vehicles $28.4 million in Recovery Act funding going toward geothermal plant Plant expected to produce 4 MW of electrical power, employ 25 full-time workers Chemetall produces lithium carbonate to customers in a wide range of industries, including for batteries used in electric vehicles, and now the

Note: This page contains sample records for the topic "installation problems bullet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Sacramento area, solar domestic water heater installers survey report  

SciTech Connect

Information regarding generic type, make, and costs of solar domestic water heater (SDWH) systems in the Sacramento, Roseville, and Davis area is reported. Sixteen SDWH installers/do-it-yourself kit dealers were identified and surveyed by phone. The survey participants were divided into three categories: (1) installers in business for one year or longer, (eight firms); (2) installers in business less than one year, (five firms); and (3) SDWH do-it-yourself kit dealers, (three firms). The survey report establishes an average cost for SDWH pump systems for new single family unit production housing (1350 square feet), with hot water demand typical of an average family of four, and roof mounted collectors. For the first two categories, the SDWH system average cost is $2469 (this includes both open loop and heat exchanger systems with circulating pumps). The average cost of the open loop pump system is $2321; whereas, the heat exchanger pump system average cost is $2592. The participants were questioned concerning discounts they would offer to builders purchasing SDWH's in volume. From their responses, an 11% discount for a purchase of ten systems was derived for the first two installers categories. The average cost of an installed SDWH pump system purchased in a volume of ten units is $2201. The average cost of an installed SDWH open loop system is $2066, and a heat exchanger system is $2307. For the third category, the do-it-yourself kit dealers, a 12% discount was derived for a purchase of ten systems. The average cost of a do-it-yourself pump kit when purchased in a volume of ten units is $1481. The average cost of an open loop pump kit is $1386, and a heat exchanger pump kit is $1672.

Hutchcraft, T.

1979-11-01T23:59:59.000Z

202

Y-12 to Install New Fence to Reduce Trespassing | Y-12 National...  

NLE Websites -- All DOE Office Websites (Extended Search)

to Install New Fence ... Y-12 to Install New Fence to Reduce Trespassing Posted: April 23, 2013 - 3:56pm New fence to be installed by April 4 The National Nuclear Security...

203

Safety aspects of small solar installations. A bibliography  

SciTech Connect

Solar energy is viewed by many as a very economical alternative to fossil fuel and/or nuclear energy, and considerable developmental work has been undertaken aimed toward harnessing solar energy for heating and air conditioning of buildings, especially residences. However, little attention has been paid to the safety and environmental aspects of solar installations. Some of the health, safety, and environmental hazards which have been identified as being inherent in small solar heating and cooling systems are summerized. The bibliography lists 24 documents that deal with the installation of small solar-heating and air-conditioniong systems, especially for single-family residences.

James, A.H. Jr.

1977-09-14T23:59:59.000Z

204

Power-installed streetlight foundations lower substation construction costs  

SciTech Connect

The Alabama Power Company's power-installed streetlight foundation (SLF) saves 85% of labor costs and is practical as well as economical. After several foundation designs were tried, the multi-helix proved best for swampy terrain. A test of substation structure support began with soil testing to locate any rock on the site. Standard tubular-steel structures with modified baseplates were used. A truck-mounted derrick proved better for installation than a drill rig. Slight corrosive currents are not expected to cause appreciable deterioration to the foundation. (DCK)

Beason, D.

1981-07-01T23:59:59.000Z

205

Solar system installation at Louisville, Kentucky (final report)  

DOE Green Energy (OSTI)

A contract was awarded in June 1976 for the installation of a solar space heating and domestic hot water system at 2400 Watteroon Trail, Louisville, Kentucky. The overall philosophy used was to install both a liquid and a hot air system retrofitted to the existing office and combined warehouse building. The 1080 sq ft office space is heated first and excess heat is dumped into the warehouse. The two systems offered a unique opportunity to measure the performance and compare results of both air and liquid at one site. The two systems are described in detail and information on the data acquisition system is included.

Not Available

1978-08-07T23:59:59.000Z

206

Installation system for integral mounting of thermal or photovoltaic panels  

Science Conference Proceedings (OSTI)

A unique installation system for mounting solar thermal or photovoltaic solar collector panels as an integral part of a structure is described. The most common example would have the collector array replacing the sheathing and shingles of a roof supported by trusses or rafters on 24 inch centers. The design achieves the goals of a good integral installation which is reliably weathertight, rapid and easy to execute by typical construction workers with little specific extra training and no special tools. All materials and components are commercially available and have proven performance.

Rost, D.F. (Solar Energy Engineering, Poland, OH); Ameduri, G.; Groves, L.

1981-01-01T23:59:59.000Z

207

Pages that link to "New England Breeze Solar and Wind Installers...  

Open Energy Info (EERE)

this page on Facebook icon Twitter icon Pages that link to "New England Breeze Solar and Wind Installers" New England Breeze Solar and Wind Installers Jump to:...

208

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

E-Print Network (OSTI)

Prices. . . . . 14 Installed Project Costs Are On the Rise,of Decline. . 15 Project Cost Increases Are a Function ofin installed wind project costs, wind turbine transaction

2008-01-01T23:59:59.000Z

209

Permits to Install,New Source Review (PTI,NSR) (Michigan) |...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Permits to Install,New Source Review (PTI,NSR) (Michigan) Permits to Install,New Source Review (PTI,NSR) (Michigan) Eligibility Utility Fed. Government Commercial Agricultural...

210

Hg System Operation Review MERIT Pre-Installation Review  

E-Print Network (OSTI)

hydraulic pump · 40 gal vegetable-oil based hydraulic fluid · Hg flow rate 1.6liter/s (24.9gpm) · Piston System Description · Syringe pump · Hydraulic power unit w/control system · Optical diagnostic system Pre-Installation Review 30 Mar 2007 Syringe Pump System · Primary containment - Hg-wetted components

McDonald, Kirk

211

Systems Study Of Drilling For Installation Of Geothermal Heat Pumps  

E-Print Network (OSTI)

Geothermal, or ground-source, heat pumps (GHP) are much more efficient than air-source units such as conventional air conditioners. A major obstacle to their use is the relatively high initial cost of installing the heat-exchange loops into the ground. In an effort to identify drivers which influence installation cost, a number of site visits were made during 1996 to assess the state-of-the-art in drilling for GHP loop installation. As an aid to quantifying the effect of various drilling-process improvements, we constructed a spread-sheet based on estimated time and material costs for all the activities required in a typical loop-field installation. By substituting different (improved) values into specific activity costs, the effect on total project costs can be easily seen. This report contains brief descriptions of the site visits, key points learned during the visits, copies of the spread-sheet, recommendations for further work, and sample results from sensitivity analysis using the...

John Finger William; William N. Sullivan; Ronald D. Jacobson; Kenneth G. Pierce

1997-01-01T23:59:59.000Z

212

Device for regulating radiant flux in solar installations  

SciTech Connect

Devices for regulating luminous flux in solar installations that concentrate solar radiation are considered. Shutter-type luminous-flux regulators located on heliostats are considered, as well as devices that permit automatic variation in orientation of each concentrator facet in accordance with the prescribed program. The advantages and drawbacks of the devices described are cited.

Khakimov, R.A.; Zakhidov, R.A.; Sizov, Yu.M.

1980-01-01T23:59:59.000Z

213

Systems study of drilling for installation of geothermal heat pumps  

DOE Green Energy (OSTI)

Geothermal, or ground-source, heat pumps (GHP) are much more efficient than air-source units such as conventional air conditioners. A major obstacle to their use is the relatively high initial cost of installing the heat-exchange loops into the ground. In an effort to identify drivers which influence installation cost, a number of site visits were made during 1996 to assess the state-of-the-art in drilling for GHP loop installation. As an aid to quantifying the effect of various drilling-process improvements, we constructed a spread-sheet based on estimated time and material costs for all the activities required in a typical loop-field installation. By substituting different (improved) values into specific activity costs, the effect on total project costs can be easily seen. This report contains brief descriptions of the site visits, key points learned during the visits, copies of the spread-sheet, recommendations for further work, and sample results from sensitivity analysis using the spread-sheet.

Finger, J.T.; Sullivan, W.N.; Jacobson, R.D.; Pierce, K.G.

1997-09-01T23:59:59.000Z

214

STATE OF CALIFORNIA QUALITY INSULATION INSTALLATION FRAMING STAGE CHECKLIST  

E-Print Network (OSTI)

be accepted by the building department or HERS rater. SPF insulation can be considered an air barrier when be insulated. These areas shall be called out on the building plans with diagrams and/or specific designSTATE OF CALIFORNIA QUALITY INSULATION INSTALLATION ­ FRAMING STAGE CHECKLIST CEC-CF-4R-ENV-21

215

Installation and assembly device and method of using  

DOE Patents (OSTI)

The present invention relates to an installation and assembly device and method for facilitating the fitup of mating components during blind or remote installation and assembly, especially where close fitup tolerances are involved. The present invention is particularly useful for the purpose of facilitating vertical and/or radial relative positioning of a pump impeller within a mating inlet nozzle during a blind assembly wherein actual fitup cannot be observed during installation. The information within identifies just one successful application of the installation and assembly alignment device for a pump. The device, however, is not solely limited to pump assembly but can be used in other cases where fitup of a sleeve inside a mating bore is required under conditions of close tolerance during a blind or remote assembly. The device is likewise not limited to circular configurations but can be used for many other shapes or configurations. Any material that can be machined and hold reasonably close tolerances can be used for the device. Also, because the sleeve position is adjusted by set screws or bolts, the concentricity can be radially biased, if required, to achieve particular alignment conditions.

Kolsun, G.J.

1995-12-31T23:59:59.000Z

216

Evaluation of Trenchless Installation Technology for Radioactive Wastewater Piping Applications  

SciTech Connect

The U.S. Department of Energy (DOE) Office of Environmental Management (EM) cleanup mission at Oak Ridge National Laboratory (ORNL) includes dispositioning facilities, contaminated legacy materials/waste, and contamination sources and remediation of soil under facilities, groundwater, and surface water to support final Records of Decision (RODs). The Integrated Facilities Disposition Project (IFDP) is a roughly $15B project for completion of the EM mission at Oak Ridge, with a project duration of up to 35 years. The IFDP Mission Need Statement - Critical Decision-0 (CD-0) - was approved by DOE in July 2007, and the IFDP Alternative Selection and Cost Range - Critical Decision-1 (CD-1) - was approved in November 2008. The IFDP scope includes reconfiguration of waste collection and treatment systems as needed to complete the IFDP remediation and decontamination and decommissioning (D&D) missions in a safe and cost-effective manner while maintaining compliance with all governing regulations and bodies and preserving the support of continuing operations at ORNL. A step in the CD-1 approval process included an external technical review (ETR) of technical approaches proposed in the CD-1 document related to the facility reconfiguration for the ORNL radioactive waste and liquid low-level waste management systems. The ETR team recommended that the IFDP team consider the use of trenchless technologies for installing pipelines underground in and around contaminated sites as part of the alternatives evaluations required in support of the CD-2 process. The team specifically recommended evaluating trenchless technologies for installing new pipes in existing underground pipelines as an alternative to conventional open trench installation methods. Potential benefits could include reduction in project costs, less costly underground piping, fewer disruptions of ongoing and surface activities, and lower risk for workers. While trenchless technologies have been used extensively in the sanitary sewer and natural gas pipeline industries, they have been used far less in contaminated environments. Although trenchless technologies have been used at ORNL in limited applications to install new potable water and gas lines, the technologies have not been used in radioactive applications. This study evaluates the technical risks, benefits, and economics for installing gravity drained and pressurized piping using trenchless technologies compared to conventional installation methods for radioactive applications under ORNL geological conditions. A range of trenchless installation technologies was reviewed for this report for general applicability for replacing existing contaminated piping and/or installing new pipelines in potentially contaminated areas. Installation methods that were determined to have potential for use in typical ORNL contaminated environments were then evaluated in more detail for three specific ORNL applications. Each feasible alternative was evaluated against the baseline conventional open trench installation method using weighted criteria in the areas of environment, safety, and health (ES&H); project cost and schedule; and technical operability. The formulation of alternatives for evaluation, the development of selection criteria, and the scoring of alternatives were performed by ORNL staff with input from vendors and consultants. A description of the evaluation methodology and the evaluation results are documented in the following sections of this report.

Robinson, Sharon M [ORNL; Jubin, Robert Thomas [ORNL; Patton, Bradley D [ORNL; Sullivan, Nicholas M [ORNL; Bugbee, Kathy P [ORNL

2009-09-01T23:59:59.000Z

217

Electricity production and cooling energy savings from installation of a  

NLE Websites -- All DOE Office Websites (Extended Search)

production and cooling energy savings from installation of a production and cooling energy savings from installation of a building-integrated photovoltaic roof on an office building Title Electricity production and cooling energy savings from installation of a building-integrated photovoltaic roof on an office building Publication Type Journal Article Year of Publication 2013 Authors Ban-Weiss, George, Craig P. Wray, William W. Delp, Peter Ly, Hashem Akbari, and Ronnen M. Levinson Journal Energy and Buildings Volume 56 Pagination 210 - 220 ISSN 0378-7788 Keywords Advanced Technology Demonstration, building design, Building heat transfer, cool roof, energy efficiency, Energy Performance of Buildings, energy savings, Energy Usage, energy use, Heat Island Abstract Reflective roofs can reduce demand for air conditioning and warming of the atmosphere. Roofs can also host photovoltaic (PV) modules that convert sunlight to electricity. In this study we assess the effects of installing a building integrated photovoltaic (BIPV) roof on an office building in Yuma, AZ. The system consists of thin film PV laminated to a white membrane, which lies above a layer of insulation. The solar absorptance of the roof decreased to 0.38 from 0.75 after installation of the BIPV, lowering summertime daily mean roof upper surface temperatures by about 5 °C. Summertime daily heat influx through the roof deck fell to ±0.1 kWh/m2from 0.3-1.0 kWh/m2. However, summertime daily heat flux from the ventilated attic into the conditioned space was minimally affected by the BIPV, suggesting that the roof was decoupled from the conditioned space. Daily PV energy production was about 25% of building electrical energy use in the summer. For this building the primary benefit of the BIPV appeared to be its capacity to generate electricity and not its ability to reduce heat flows into the building. Building energy simulations were used to estimate the cooling energy savings and heating energy penalties for more typical buildings.

218

FORSCOM installation characterization and ranking for water efficiency improvement  

SciTech Connect

On March 11, 1994, President Clinton signed Executive Order 12902-Energy Efficiency and Water Conservation at Federal Facilities. Section 302 of the Executive Order calls for energy and water prioritization surveys of federal facilities to be conducted. The surveys will be used to establish priorities for conducting comprehensive facility audits. In response to the requirements of the Executive Order, the U.S. Army Forces Command (FORSCOM) has tasked Pacific Northwest Laboratory (PNL) to initiate a broad study of the water savings potential at each of its major installations. This report provides an assessment of the water, sewer, energy (for hot water production and pumping), and associated cost savings potential at ten of the major FORSCOM installations. This assessment is meant to be a {open_quotes}first pass{close_quotes} estimate of the water savings potential, to assist FORSCOM in prioritizing installations for detailed water audits and potential water efficient retrofits. In addition, the end uses (toilets, sinks, showerheads, irrigation, etc.) with the greatest water savings potential are identified at each installation. This report is organized in the following manner. Following this Introduction, Section 2 provides important background information pertaining to the water analysis. Section 3 describes the methodology employed in the analysis, and Section 4 summarizes the study results. Section 5 prioritizes the installations based on both water/sewer savings and cost associated with water, sewer, and energy savings. Section 6 provides recommendations on where to start detailed water audits, as well as other recommendations. References are listed in Section 7. The appendices provide specific information on the analysis results and methodology, along with a discussion of special issues.

Fitzpatrick, Q.K.; McMordie, K.L.; Di Massa, F.V. [and others

1995-05-01T23:59:59.000Z

219

EA-1655: Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition, Installation and Use for Research and Development  

Energy.gov (U.S. Department of Energy (DOE))

Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition, Installation and Use for Research and Development

220

Installing NikonView 4 under Windows (COOLPIX5000/995/885/775/990/880) A-1 Installing NikonView 4 underWindows  

E-Print Network (OSTI)

Installing NikonView 4 under Windows (COOLPIX5000/995/885/775/990/880) A-1 Installing NikonView 4 underWindows Installing Nikon View 4 for the COOLPIX5000/995/885/775/990/880 NikonView 4 includes- trator" (Windows 2000 Professional) or "ComputerAdministrator" (Win- dows XP Home Edition/Windows XP

Kleinfeld, David

Note: This page contains sample records for the topic "installation problems bullet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Pantex installs new high explosives equipment | National Nuclear Security  

NLE Websites -- All DOE Office Websites (Extended Search)

high explosives equipment | National Nuclear Security high explosives equipment | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Pantex installs new high explosives equipment Pantex installs new high explosives equipment Posted By Office of Public Affairs Joel Ramos works with the lathe. Big jobs are nothing new for the Projects Division at Pantex, and the

222

Microsoft Word - Final_NineCanyon_CommunicationTowerInstall_CX  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2013 1, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Kelly Gardner, PMP Project Manager, TEP-TPP-1 Proposed Action: Nine Canyon Substation Communication Tower Addition: 331800 McNary Sub Bus Tie Relay Replacements and 310427 McNary-Badger Canyon Transfer Trip Install Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 - Additions and modifications to transmission facilities Location: Kennewick, Benton County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to install a 60-foot communications tower and associated communication equipment at the Benton County Public Utility District's Nine Canyon Substation in Benton County, Washington. The upgrade would involve replacing the

223

Pantex installs new high explosives equipment | National Nuclear Security  

National Nuclear Security Administration (NNSA)

high explosives equipment | National Nuclear Security high explosives equipment | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Pantex installs new high explosives equipment Pantex installs new high explosives equipment Posted By Office of Public Affairs Joel Ramos works with the lathe. Big jobs are nothing new for the Projects Division at Pantex, and the

224

Idaho National Engineering Laboratory installation roadmap document. Revision 1  

SciTech Connect

The roadmapping process was initiated by the US Department of Energy`s office of Environmental Restoration and Waste Management (EM) to improve its Five-Year Plan and budget allocation process. Roadmap documents will provide the technical baseline for this planning process and help EM develop more effective strategies and program plans for achieving its long-term goals. This document is a composite of roadmap assumptions and issues developed for the Idaho National Engineering Laboratory (INEL) by US Department of Energy Idaho Field Office and subcontractor personnel. The installation roadmap discusses activities, issues, and installation commitments that affect waste management and environmental restoration activities at the INEL. The High-Level Waste, Land Disposal Restriction, and Environmental Restoration Roadmaps are also included.

1993-05-30T23:59:59.000Z

225

Experimental investigation of a solar desiccant cooling installation  

Science Conference Proceedings (OSTI)

Desiccant cooling is a technique based on evaporative cooling and air dehumidification using desiccant regenerated by thermal energy. It is particularly interesting when it is driven by waste or solar heat making this technique environmentally friendly. In this paper, an experimental investigation is carried on a desiccant air handling unit powered by vacuum-tube solar collectors. First, the components are studied under various operating conditions. Then overall performance of the installation is evaluated over a day for a moderately humid climate with regeneration solely by solar energy. In these conditions the overall efficiency of the solar installation is 0.55 while the thermodynamic coefficient of performance is 0.45 and the performance indicator based on the electrical consumption is 4.5. Finally, the impact of outside and regeneration conditions on the performance indicators is studied. (author)

Bourdoukan, P.; Wurtz, E. [LOCIE Laboratoire Optimisation de la Conception et Ingenierie de l'Environnement, Campus Scientifique Universite de Savoie, 73376 Le Bourget du Lac (France); Joubert, P. [LEPTIAB Laboratoire d'Etude des Phenomenes de Transfert et de l'Instantaneite Agro-Industrie et Batiment Pole Sciences et Technologies, Universite La Rochelle, Avenue Marillac 17000 La Rochelle (France)

2009-11-15T23:59:59.000Z

226

Advanced natural gas fuel technologies for military installations. Final report  

SciTech Connect

Energy conservation efforts reduced Department of Defense (DoD) fossil fuel consumption considerably between FYX5 and FY9 I, yet electricity consumption increased. Electricity consumption accounts for only one-third of DoD energy use, but over half of DoD energy costs. In addition, the production of electricity at coal or nuclear plants often creates environmental concerns, while the use of clean-burning natural gas does not; its use can help DoD bases comply with increasingly stringent environmental regulations. Recent developments in natural gas-fired technologies also demonstrate improved efficiency and productivity at lower costs. This report identifies state-of-the-art and emerging natural gas utilization technologies with potential application on DoD installations. This report describes various technologies that have potential residential, commercial, or industrial applications on DoD installations. Applications include heating, cooling, power generation, food preparation, and several industrial processes.

Savoie, M.J.; Freeman, P.M.; Blazek, C.F.; Potts, N.L.

1994-09-01T23:59:59.000Z

227

CSP'960H/CSP-960S Installation Guide  

E-Print Network (OSTI)

CSP'960H/CSP-960S Installation Guide 4-634-979-01 TM Read First! 1^00 - 3lG - 755; #12;CSP-960H/CSP CSP-960H only) J Sony CDU926S CD-R Drive Unit User's Guide Use this manual as a guide to help you. If all the items are not found, please contact your Sony dealer before proceeding. G CSP-960H/960S CD

Kleinfeld, David

228

Installing micro-hydro in the developing nations  

SciTech Connect

The difficulties encountered in installing a micro-hydroelectric power system in Korupun, a mission station/community located in the highlands of Irian Jaya, Indonesia are discussed. Initial construction resulted in the completion of a diversion structure, a 400 ft. power canal, a settling pond, intake works and a power house foundation. The site itself would use less than minimum stream-flow, a 900 ft. penstock and 150 ft. of net effective head to produce 12 kilowatts of electricity.

Johnson, M.

1986-02-01T23:59:59.000Z

229

Open PV Project: Unlocking PV Installation Data (Brochure)  

SciTech Connect

This brochure summarizes the Open PV Project, a collaborative effort of government, industry, and the public to compile a comprehensive database of PV installations in the United States. The brochure outlines the purpose and history of the project as well as the main capabilities and benefits of the online Open PV tool. The brochure also introduces how features of the tool are used, and it describes the sources and characteristics of Open PV's data and data collection processes.

Not Available

2012-04-01T23:59:59.000Z

230

Wind Gains ground, hitting 33 GW of installed capacity  

Science Conference Proceedings (OSTI)

The U.S. currently has 33 GW of installed wind capacity. Wind continues to gain ground, accounting for 42 percent of new capacity additions in the US in 2008.Globally, there are now 146 GW of wind capacity with an impressive and sustained growth trajectory that promises to dominate new generation capacities in many developing countries. The U.S., however, lags many European countries, with wind providing roughly 2 percent of electricity generation.

NONE

2010-06-15T23:59:59.000Z

231

Retrofit Installation of a Residential Photovoltaic Power System  

Science Conference Proceedings (OSTI)

Photovoltaic (PV) systems offer great potential for utility customers to supplement centrally supplied power. However, because these systems are still quite novel, the process of gaining approval for and installing them is unfamiliar and not standardized at most utility companies. Therefore, it can prove sufficiently challenging that it presents a barrier to would-be PV owners. This report looks at that process as it applied to a residential system in Phoenix, Arizona, and proposes ways that the process ...

2003-03-19T23:59:59.000Z

232

Environmental assessment: Kotzebue Wind Installation Project, Kotzebue, Alaska  

DOE Green Energy (OSTI)

The DOE is proposing to provide financial assistance to the Kotzebue Electric Association to expand its existing wind installation near Kotzebue, Alaska. Like many rural Alaska towns, Kotzebue uses diesel-powered generators to produce its electricity, the high cost of which is currently subsidized by the Alaska State government. In an effort to provide a cost effective and clean source of electricity, reduce dependence on diesel fuel, and reduce air pollutants, the DOE is proposing to fund an experimental wind installation to test commercially available wind turbines under Arctic conditions. The results would provide valuable information to other Alaska communities experiencing similar dependence on diesel-powered generators. The environmental assessment for the proposed wind installation assessed impacts to biological resources, land use, electromagnetic interference, coastal zone, air quality, cultural resources, and noise. It was determined that the project does not constitute a major Federal action significantly affecting the quality of the human environment. Therefore, the preparation of an environmental impact statement is not required, and DOE has issued a Finding of No Significant Impact.

NONE

1998-05-01T23:59:59.000Z

233

Installed Geothermal Capacity/Data | Open Energy Information  

Open Energy Info (EERE)

Installed Geothermal Capacity/Data Installed Geothermal Capacity/Data < Installed Geothermal Capacity Jump to: navigation, search Download a CSV file of the table below: CSV FacilityType Owner Developer EnergyPurchaser Place GeneratingCapacity NumberOfUnits CommercialOnlineDate HeatRate WindTurbineManufacturer FacilityStatus Aidlin Geothermal Facility Geothermal Steam Power Plant Calpine Geysers Geothermal Area 20 MW20,000 kW 20,000,000 W 20,000,000,000 mW 0.02 GW 2.0e-5 TW 2 1989 Amedee Geothermal Facility Binary Cycle Power Plant Amedee Geothermal Venture Honey Lake, California 1.6 MW1,600 kW 1,600,000 W 1,600,000,000 mW 0.0016 GW 1.6e-6 TW 2 1988 BLM Geothermal Facility Double Flash Coso Operating Co. Coso Junction, California, 90 MW90,000 kW 90,000,000 W

234

Installation of a fast framing visible camera on KSTAR  

Science Conference Proceedings (OSTI)

Visible camera technologies have made remarkable progress in recent years, and the fast camera has proven itself to be a capable imaging diagnostic in studies of specific fusion plasma issues such as the start-up physics, plasma wall interactions, edge-localized modes, and disruptions. For the purpose of favorable visible imaging, a fast framing camera has recently been installed on the Korea Superconducting Tokamak Advanced Research (KSTAR) device. The camera uses a complementary metal-oxide semiconductor detector with a maximum resolution of 1280x1024 at 1000 frames/s (fps) and a minimum resolution of 1280x16 at 64 kfps. A 2-m-long viewport having a novel optical rail system was installed on a tangential port to view the tokamak interior. The system is fully controlled from the main control room and protected by a shutter from deposits. To verify that the camera electronics are safe from the high magnetic field and its rapid time variation, possible influences are considered theoretically and experimentally. In this work, we present the design and installation of the fast camera system on the KSTAR device with discussions on the field variation effect issues.

Chung, Jinil; Lee, Deok Kyo; Seo, Dongcheol [National Fusion Research Institute, Gwahangno 113, Daejeon 305-333 (Korea, Republic of); Choi, Myoung Choul [Korea Basic Science Institute, 804-1 Ochang, Cheongwon 363-883 (Korea, Republic of)

2008-10-15T23:59:59.000Z

235

Procedures for sprinkler anchor installation on surfaces with fireproofing materials  

SciTech Connect

Procedures were developed for limiting the release of fibers from fireproofing material during sprinkler hanger anchor installation on steel deck/concrete floor slab surfaces. These procedures were needed by the General Services Administration (GSA) for installation of sprinkler systems in buildings having fireproofing containing asbestos. A prototype floor slab having spray-on friable mineral wool fireproofing was used in laboratory tests. The mineral-wool fireproofing was used as a model system for fireproofing containing asbestos. The various combinations of mechanical anchoring procedures (use of drills or powder-actuated gun) and encapsulation procedures tested limited the fiber release to a range of values of 0.000 to 0.055 f/cc (fibers per cubic centimeter) as compared to a range of values of 0.26 to 0.82 f/cc for procedures without encapsulation. Encapsulation was shown to be effective as evidenced by much higher levels of fiber release during testing without encapsulation. Because there is no known correlation between the release of mineral-wool fibers and asbestos fibers, it was recommended that the procedures developed be evaluated by GSA in buildings having fireproofing containing asbestos. An air-sampling protocol was developed for use by GSA in evaluating the procedures in the field. Subsequently field tests were conducted by GSA. The laboratory and field studies provided GSA with an effective procedure, measurement method, and decision tool for installing sprinkler hanger anchors in steel deck/concrete floor slabs having fireproofing materials.

Mathey, R.G.; Knab, L.I.; Gross, J.L.; Small, J.A.

1988-02-01T23:59:59.000Z

236

Upgrading ESP efficiency is a problem  

SciTech Connect

The twin problems of efficiency loss, coupled with capricious EPA regulatory changes, can create many difficulties for utilities that already have, or plan to install, electrostatic precipitators in their coal-fired stations. To cut the costs of retrofit and efficiency degradation, there are several off-the-shelf, computer-based, electronic-monitoring and -control systems that can either be individually operated or multiplexed remotely by means of today's state-of-the-art hardware and software. These are discussed.

Hurst, R.

1980-04-15T23:59:59.000Z

237

Experimental Evaluation of Installed Cooking Exhaust Fan Performance  

NLE Websites -- All DOE Office Websites (Extended Search)

Experimental Evaluation of Installed Cooking Exhaust Fan Performance Experimental Evaluation of Installed Cooking Exhaust Fan Performance Title Experimental Evaluation of Installed Cooking Exhaust Fan Performance Publication Type Report LBNL Report Number LBNL-4183E Year of Publication 2010 Authors Singer, Brett C., William W. Delp, and Michael G. Apte Publisher Lawrence Berkeley National Laboratory City Berkeley Keywords airflow & pollutant transport group, cooktop, energy analysis and environmental impacts department, gas burners, indoor air quality, indoor environment department, kitchen, nitrogen dioxide, oven, pollutant emissions, range hood, residential, source control, task ventilation, technology, sustainability and impact assessment group Abstract The installed performance of cooking exhaust fans was evaluated through residential field experiments conducted on a sample of 15 devices varying in design and other characteristics. The sample included two rear downdraft systems, two under-cabinet microwave over range (MOR) units, three different installations of an under-cabinet model with grease screens across the bottom and no capture hood, two devices with grease screens covering the bottom of a large capture hood (one under-cabinet, one wall-mount chimney), four under-cabinet open hoods, and two open hoods with chimney mounts over islands. Performance assessment included measurement of airflow and sound levels across fan settings and experiments to quantify the contemporaneous capture efficiency for the exhaust generated by natural gas cooking burners. Capture efficiency is defined as the fraction of generated pollutants that are removed through the exhaust and thus not available for inhalation of household occupants. Capture efficiency (CE) was assessed for various configurations of burner use (e.g. single front, single back, combination of one front and one back, oven) and fan speed setting. Measured airflow rates were substantially lower than the levels noted in product literature for many of the units. This shortfall was observed for several units costing in excess of $1000. Capture efficiency varied widely (from <5% to roughly 100%) across devices and across conditions for some devices. As expected, higher capture efficiencies were achieved with higher fan settings and the associated higher air flow rates. In most cases, capture efficiencies were substantially higher for rear burners than for front burners. The best and most consistent performance was observed for open hoods that covered all cooktop burners and operated at higher airflow rates. The lowest capture efficiencies were measured when a front burner was used with a rear backdraft system or with lowest fan setting for above the range systems that do not cover the front burners.

238

Solar photovoltaic applications seminar: design, installation and operation of small, stand-alone photovoltaic power systems  

DOE Green Energy (OSTI)

This seminar material was developed primarily to provide solar photovoltaic (PV) applied engineering technology to the Federal community. An introduction to photoconductivity, semiconductors, and solar photovoltaic cells is included along with a demonstration of specific applications and application identification. The seminar details general systems design and incorporates most known information from industry, academia, and Government concerning small solar cell power system design engineering, presented in a practical and applied manner. Solar PV power system applications involve classical direct electrical energy conversion and electric power system analysis and synthesis. Presentations and examples involve a variety of disciplines including structural analysis, electric power and load analysis, reliability, sizing and optimization; and, installation, operation and maintenance. Four specific system designs are demonstrated: water pumping, domestic uses, navigational and aircraft aids, and telecommunications. All of the applications discussed are for small power requirement (under 2 kilowatts), stand-alone systems to be used in remote locations. Also presented are practical lessons gained from currently installed and operating systems, problems at sites and their resolution, a logical progression through each major phase of system acquisition, as well as thorough design reviews for each application.

Not Available

1980-07-01T23:59:59.000Z

239

Solar heating and hot water system installed at St. Louis, Missouri. Final report  

DOE Green Energy (OSTI)

Information is provided on the solar heating and hot water system installed at the William Tao and Associates, Inc., office building in St. Louis, Missouri. The information consists of description, photos, maintenance and construction problems, final drawing, system requirements and manufacturer's component data. The solar system was designed to provide 50% of the hot water requirements and 45% of the space heating needs for a 900 square foot office space and drafting room. The solar facility has 252 square foot of glass tube concentrator collectors and a 1000 gallon steel storage tank buried below a concrete slab floor. Freeze protection is provided by a propylene glycol/water mixture in the collector loop. The collectors are roof mounted on a variable tilt array which is adjusted seasonally and is connected to the solar thermal storage tank by a tube-in-shell heat exchanger. Incoming city water is preheated through the solar energy thermal storage tank.

Not Available

1980-04-01T23:59:59.000Z

240

Install the E-print Network toolbar -- Energy, science, and technology for  

Office of Scientific and Technical Information (OSTI)

Browser Toolbar The E-print Network offers a browser toolbar for easy access to e-print searches and discipline pages. EPN browser toolbar Two installation options are available for the EPN browser toolbar: Internet Explorer - Download and install the toolbar using the Softomate ActiveX Web installer Please select "Install ActiveX Control" when prompted by your browser. Install toolbar for Internet Explorer Can't see the toolbar after installing? Note: Browser security settings at some organizations may prevent installation or use of the toolbar in Internet Explorer. Try installing the toolbar in the FireFox browser, using the button below. Minimum System Requirements: Windows XP/Vista Internet Explorer 6 or Firefox 2 FireFox - Install toolbar for FireFox

Note: This page contains sample records for the topic "installation problems bullet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Solar heating and hot water system installed at Listerhill, Alabama  

DOE Green Energy (OSTI)

The solar system was installed into a new buildng and was designed to provide 79% of the estimated annual space heating load and 59% of the estimated annual potable hot water requirement. The collectors are flat plate, liquid manufactured by Reynolds Metals Company and cover a total area of 2344 square feet. The storage medium is water inhibited with NALCO 2755 and the container is an underground, unpressurized steel tank with a capacity of 5000 gallons. This final report describes in considerable detail the solar heating facility and contains detailed drawings of the completed system.

Not Available

1978-12-01T23:59:59.000Z

242

Installation, Operation, and Maintenance Costs for Distributed Generation Technologies  

Science Conference Proceedings (OSTI)

Distributed generation (DG) is a broad term that encompasses both mature and emerging onsite power generation technologies with power output as small as 1 kW and as large as 20 MW. While the equipment or purchase cost of a DG system is very important, installation, operation, and maintenance (IOM) costs also are significant and often overlooked. This report reviews IOM costs for both mature and emerging DG technologies. Some equipment cost data is included for reference, but is not the focus of this repo...

2003-02-03T23:59:59.000Z

243

Oil/gas separator for installation at burning wells  

DOE Patents (OSTI)

An oil/gas separator is disclosed that can be utilized to return the burning wells in Kuwait to production. Advantageously, a crane is used to install the separator at a safe distance from the well. The gas from the well is burned off at the site, and the oil is immediately pumped into Kuwait's oil gathering system. Diverters inside the separator prevent the oil jet coming out of the well from reaching the top vents where the gas is burned. The oil falls back down, and is pumped from an annular oil catcher at the bottom of the separator, or from the concrete cellar surrounding the well.

Alonso, Carol T. (Orinda, CA); Bender, Donald A. (Dublin, CA); Bowman, Barry R. (Livermore, CA); Burnham, Alan K. (Livermore, CA); Chesnut, Dwayne A. (Pleasanton, CA); Comfort, III, William J. (Livermore, CA); Guymon, Lloyd G. (Livermore, CA); Henning, Carl D. (Livermore, CA); Pedersen, Knud B. (Livermore, CA); Sefcik, Joseph A. (Tracy, CA); Smith, Joseph A. (Livermore, CA); Strauch, Mark S. (Livermore, CA)

1993-01-01T23:59:59.000Z

244

Oil/gas separator for installation at burning wells  

DOE Patents (OSTI)

An oil/gas separator is disclosed that can be utilized to return the burning wells in Kuwait to production. Advantageously, a crane is used to install the separator at a safe distance from the well. The gas from the well is burned off at the site, and the oil is immediately pumped into Kuwait`s oil gathering system. Diverters inside the separator prevent the oil jet coming out of the well from reaching the top vents where the gas is burned. The oil falls back down, and is pumped from an annular oil catcher at the bottom of the separator, or from the concrete cellar surrounding the well.

Alonso, C.T.; Bender, D.A.; Bowman, B.R. [and others

1991-12-31T23:59:59.000Z

245

Video Installation Design: Appropriation and Assemblage As Projection Surface Geometry  

E-Print Network (OSTI)

This area of research focuses on the use of video projections in the context of fine art. Emphasis is placed on creating a unique video installation work that incorporates assemblage and appropriation as a means to develop multiple complex geometrical surfaces for video projection. The purpose of this research is to document a working process within a pre-defined set of guidelines that is influenced from my past work and the study of other artist?s prior work. Research includes the demonstration of the entire working process to create this original work and recommendations for future artists who wish to work in this medium.

Weaver, Timothy A.

2010-05-01T23:59:59.000Z

246

Solar hot water system installed at Anderson, South Carolina  

DOE Green Energy (OSTI)

The solar energy hot water system installed in the Days Inns of America, Inc., at Anderson, South Carolina is described. The building is a low-rise two-story 114-room motel. The solar components were partly funded by the Department of Energy. The solar system was designed to provide 40% of the total hot water demand. The collector is a flat plate, liquid with an area of 750 square feet. Operation of this system was begun in November 1977, and has performed flawlessly for one year.

Not Available

1978-12-01T23:59:59.000Z

247

Oil/gas separator for installation at burning wells  

DOE Patents (OSTI)

An oil/gas separator is disclosed that can be utilized to return the burning wells in Kuwait to production. Advantageously, a crane is used to install the separator at a safe distance from the well. The gas from the well is burned off at the site, and the oil is immediately pumped into Kuwait's oil gathering system. Diverters inside the separator prevent the oil jet coming out of the well from reaching the top vents where the gas is burned. The oil falls back down, and is pumped from an annular oil catcher at the bottom of the separator, or from the concrete cellar surrounding the well.

Alonso, C.T.; Bender, D.A.; Bowman, B.R.; Burnham, A.K.; Chesnut, D.A.; Comfort, W.J. III; Guymon, L.G.; Henning, C.D.; Pedersen, K.B.; Sefcik, J.A.; Smith, J.A.; Strauch, M.S.

1993-03-09T23:59:59.000Z

248

Quality Assurance of LHC Cryogenic Instrumentation during Installation and Commissioning  

E-Print Network (OSTI)

The operation and monitoring of the LHC requires a cryogenic instrumentation system of an unprecedented size (800 instrumentation crates, holding 15000 sensors and actuators), with strict constraints on temperature measurement uncertainty and radiation hardness for all sensors and actuators. This paper presents the applied procedures of quality assurance and the specific hard- & software tools used to meet and track the mentioned requirements during its lifetime (fabrication, installation, commissioning, operation and maintenance); within the given constraints of time schedule, accessibility and coordination with other teams.

Lopez Lorente, A; Casas-Cubillos, J; Fortescue, E; Gomes, P; Jeanmonod, N; Peacoba, G; Vauthier, N

2008-01-01T23:59:59.000Z

249

cutting stock problem  

Science Conference Proceedings (OSTI)

NIST. cutting stock problem. (classic problem). Definition: Find the best arrangement of shapes on rectangles to minimize ...

2013-08-23T23:59:59.000Z

250

LANSCE harp upgrade: analysis, design, fabrication and installation  

SciTech Connect

The primary goal of this newly installed beam profile measurement is to provide the facility operators and physicists with a reliable horizontal and vertical projected beam distribution and location with respect to the proton beam target and beam aperture. During a 3000-hour annual run cycle, 5 {mu}C of charge is delivered every 50 milliseconds through this harp to the downstream TRMS Mark III target. The resulting radioactive annual dose near this harp is at least 6 MGy. Because of this harsh environment, the new harp design has been further optimized for robustness. For example, compared to an earlier design, this harp has half of the sensing wires and utilizes only a single bias plane. The sensing fibers are 0.079-mm diameter SiC fibers. To hold these fibers to a rigid ceramic structure, a collet fiber-clamping device accomplishes the three goals of maintaining a mechanical fiber clamp, holding the sense fibers under a slight tensile force, and providing a sense-fiber electrical connection. This paper describes the harp analysis and design, and provides fabrication, assembly, and some installation information, and discusses wiring alterations.

Gilpatrick, John D [Los Alamos National Laboratory; Chacon, Phillip [Los Alamos National Laboratory; Martinez, Derwin [Los Alamos National Laboratory; Power, John F [Los Alamos National Laboratory; Smith, Brian G [Los Alamos National Laboratory; Taylor, Mark A [Los Alamos National Laboratory; Gruchalla, Mike [Los Alamos National Laboratory

2010-01-01T23:59:59.000Z

251

Feasibility study of burning waste paper in coal-fired boilers on Air Force installations. Master's thesis  

Science Conference Proceedings (OSTI)

This thesis examined the feasibility of using waste paper derived fuel in coal-fired boilers on Air Force installations in an attempt to help solve air pollution and solid waste disposal problems. The implementation of waste paper derived fuel was examined from both a technical acceptability and an economic feasibility viewpoint. The majority of data for this study was obtained through literature reviews and personal interviews. Waste paper was found to be technically acceptable for use as fuel. However, waste paper has certain characteristics that may create problems during combustion and therefore further research is required. These problems included the possibility of increased nitrous oxide emissions, increased volatile emissions, dioxin and furan emissions, formation of hydrochloric acid, and the presence of heavy metals in emissions and ash.

Smith, K.P.

1993-09-01T23:59:59.000Z

252

205 kW Photovoltaic (PV) System Installed on the U.S. Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

205 kW Photovoltaic (PV) System Installed on the U.S. Department of Energy's Forrestal Building 205 kW Photovoltaic (PV) System Installed on the U.S. Department of Energy's...

253

Instructions to install the Wimax extension for NS-2 Content I ...  

Science Conference Proceedings (OSTI)

... steps need to be followed to install the wimax extension: step1: add the wimax directory in the ns installation step2: add the tcl/wimax directory step3 ...

2013-05-18T23:59:59.000Z

254

New Berkeley Lab Report Tracks a Decade of PV Installed Cost Trends  

E-Print Network (OSTI)

of PV Installed Cost Trends Galen Barbose, Carla Peterman,fill this need by summarizing trends in the installed cost (the broader geographical trends in the U.S. PV market, the

Barbose, Galen

2009-01-01T23:59:59.000Z

255

Prospect for using fresnel lenses for the concentrating systems of solar installations  

SciTech Connect

The state of development work on Fresnel lenses is reported. The possibility of using them in solar installations is analyzed. It is concluded that Fresnel lenses represent promising optical systems for solar installations.

Lidorenko, N.S.; Zhukov, K.V.; Nabiullin, F.Kh.; Tver' yanovich, E.V.

1977-01-01T23:59:59.000Z

256

Annual Report on U.S. Wind Power Installation, Cost, and Performance...  

NLE Websites -- All DOE Office Websites (Extended Search)

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2007 Title Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2007...

257

Annual Report on U.S. Wind Power Installation, Cost, and Performance...  

NLE Websites -- All DOE Office Websites (Extended Search)

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006 Title Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006...

258

Installation restoration program records search for 158 tactical fighter group, Vermont Air National Guard, Burlington international airport  

SciTech Connect

The Burlington ANG Installation records search included a detailed review of pertinent installation records, contacts with 12 government organizations for documents relevant to the records search effort, and an onsite installation visit conducted by CH2M HILL during July 5 through 8, 1983. Activities conducted during the onsite installation visit included interviews with 19 past and present installation employees, ground tours of installation facilities, and a detailed search of installation records.

1983-09-01T23:59:59.000Z

259

New SRM for Bullet Casings  

Science Conference Proceedings (OSTI)

... diamond cutting tool was used to machine the surface of each with a set of six different characteristic striations, or land impressions, similar to ...

2013-01-03T23:59:59.000Z

260

Underground Transmission Cable System Construction and Installation Practices Manual 2012 Update  

Science Conference Proceedings (OSTI)

A reliable underground transmission line depends on acceptable cable system manufacturing, design, construction, installation, operation, and maintenance. Within implementation, construction and installation remain the most expensive processes. Recent advances in underground transmission have led to more demand for best practices and innovative ways to reduce construction and installation costs in a cable project.Background ...

2012-12-12T23:59:59.000Z

Note: This page contains sample records for the topic "installation problems bullet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Solar Energy Development onSolar Energy Development on DoD Installations in the  

E-Print Network (OSTI)

Solar Energy Development onSolar Energy Development on DoD Installations in the Mojave & Colorado/how solar can contribute to installation level energy· Assess whether/how solar can contribute to installation-level energy security · Recommend policy and programmatic modifications to accelerate solar

262

Solar Power Systems Find A Professional Solar Energy Installer For Any  

E-Print Network (OSTI)

Solar Power Systems Find A Professional Solar Energy Installer For Any Type Of System www.CleanEnergyAuthority.com Install Solar Panels Enter Your Zip Code & Connect To Pre-Screened Solar Panel Installers www.ServiceMagic.com Biomass Pumps Reliable metering for apps from microflow to scale-up & pilot plant www.isco.com The Solar

Lovley, Derek

263

Solar water heater installation guidelines. A manual for homeowners and professionals. [Includes glossary  

SciTech Connect

The guidelines include detailed diagrams, a selected glossary, a bibliography of books and manuals which might prove useful and a checklist which should be used during and after the installation. The guidelines explain generally how to install a liquid solar hot water heater, but not a specific system. The following are covered: collector location, collector installation, plumbing, solar storage tanks, electrical, and insulation. (MHR)

1978-04-01T23:59:59.000Z

264

Microsoft Word - CX-Ashe-CGSFiberInstallation_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2011 5, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Debbie Ruckwardt Electrical Engineer - TEP-CSB-1 Proposed Action: Installing fiber optic cables between Bonneville Power Administration's (BPA) Ashe Substation and Energy Northwest's Columbia Generating Station (CGS). Budget Information: Work Order # 00261540 PP&A Project No.: PP&A 1864 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights of way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designed purpose. Location: The project takes place between BPA's Ashe Substation and Energy Northwest's

265

Geothermal heating system and method of installing the same  

SciTech Connect

A geothermal system and method of installing the same comprises the steps successively driving a drive pipe structure vertically into the ground at a plurality of locations so that a major portion of the length of the drive pipe structure is located below the frost line. An elongate geothermal pipe having closed ends is inserted into the drive pipe structure and its lower end is interlocked with a drive point device located at the lower end of the drive pipe structure. Thereafter, when the drive pipe is removed, the geothermal pipe remains anchored to the drive point. The geothermal pipes are connected together by conduits and connected to a heat pump so that a heat exchange liquid will be circulated through the system.

Kees, E.J.; Steiger, D.W.

1981-09-01T23:59:59.000Z

266

Monte Carlo Simulation Tool Installation and Operation Guide  

Science Conference Proceedings (OSTI)

This document provides information on software and procedures for Monte Carlo simulations based on the Geant4 toolkit, the ROOT data analysis software and the CRY cosmic ray library. These tools have been chosen for its application to shield design and activation studies as part of the simulation task for the Majorana Collaboration. This document includes instructions for installation, operation and modification of the simulation code in a high cyber-security computing environment, such as the Pacific Northwest National Laboratory network. It is intended as a living document, and will be periodically updated. It is a starting point for information collection by an experimenter, and is not the definitive source. Users should consult with one of the authors for guidance on how to find the most current information for their needs.

Aguayo Navarrete, Estanislao; Ankney, Austin S.; Berguson, Timothy J.; Kouzes, Richard T.; Orrell, John L.; Troy, Meredith D.; Wiseman, Clinton G.

2013-09-02T23:59:59.000Z

267

Assembly and Installation of the Daya Bay Antineutrino Detectors  

E-Print Network (OSTI)

The Daya Bay reactor antineutrino experiment is designed to make a precision measurement of the neutrino mixing angle theta13, and recently made the definitive discovery of its nonzero value. It utilizes a set of eight, functionally identical antineutrino detectors to measure the reactor flux and spectrum at baselines of 300 - 2000m from the Daya Bay and Ling Ao Nuclear Power Plants. The Daya Bay antineutrino detectors were built in an above-ground facility and deployed side-by-side at three underground experimental sites near and far from the nuclear reactors. This configuration allows the experiment to make a precision measurement of reactor antineutrino disappearance over km-long baselines and reduces relative systematic uncertainties between detectors and nuclear reactors. This paper describes the assembly and installation of the Daya Bay antineutrino detectors.

H. R. Band; R. L. Brown; R. Carr; X. C. Chen; X. H. Chen; J. J. Cherwinka; M. C. Chu; E. Draeger; D. A. Dwyer; W. R. Edwards; R. Gill; J. Goett; L. S. Greenler; W. Q. Gu; W. S. He; K. M. Heeger; Y. K. Heng; P. Hinrichs; T. H. Ho; M. Hoff; Y. B. Hsiung; Y. Jin; L. Kang; S. H. Kettell; M. Kramer; K. K. Kwan; M. W. Kwok; C. A. Lewis; G. S. Li; N. Li; S. F. Li; X. N. Li; C. J. Lin; B. R. Littlejohn; J. L. Liu; K. B. Luk; X. L. Luo; X. Y. Ma; M. C. McFarlane; R. D. McKeown; Y. Nakajima; J. P. Ochoa-Ricoux; A. Pagac; X. Qian; B. Seilhan; K. Shih; H. Steiner; X. Tang; H. Themann; K. V. Tsang; R. H. M. Tsang; S. Virostek; L. Wang; W. Wang; Z. M. Wang; D. M. Webber; Y. D. Wei; L. J. Wen; D. L. Wenman; J. Wilhelmi; M. Wingert; T. Wise; H. L. H. Wong; F. F. Wu; Q. Xiao; L. Yang; Z. J. Zhang; W. L. Zhong; H. L. Zhuang

2013-09-06T23:59:59.000Z

268

Gas turbine nozzle vane insert and methods of installation  

SciTech Connect

A pair of hollow elongated insert bodies are disposed in one or more of the nozzle vane cavities of a nozzle stage of a gas turbine. Each insert body has an outer wall portion with apertures for impingement-cooling of nozzle wall portions in registration with the outer wall portion. The insert bodies are installed into the cavity separately and spreaders flex the bodies toward and to engage standoffs against wall portions of the nozzle whereby the designed impingement gap between the outer wall portions of the insert bodies and the nozzle wall portions is achieved. The spreaders are secured to the inner wall portions of the insert bodies and the bodies are secured to one another and to the nozzle vane by welding or brazing.

Miller, William John (Simpsonville, SC); Predmore, Daniel Ross (Clifton Park, NY); Placko, James Michael (West Chester, OH)

2002-01-01T23:59:59.000Z

269

Information handbook on independent spent fuel storage installations  

Science Conference Proceedings (OSTI)

In this information handbook, the staff of the U.S. Nuclear Regulatory Commission describes (1) background information regarding the licensing and history of independent spent fuel storage installations (ISFSIs), (2) a discussion of the licensing process, (3) a description of all currently approved or certified models of dry cask storage systems (DCSSs), and (4) a description of sites currently storing spent fuel in an ISFSI. Storage of spent fuel at ISFSIs must be in accordance with the provisions of 10 CFR Part 72. The staff has provided this handbook for information purposes only. The accuracy of any information herein is not guaranteed. For verification or for more details, the reader should refer to the respective docket files for each DCSS and ISFSI site. The information in this handbook is current as of September 1, 1996.

Raddatz, M.G.; Waters, M.D.

1996-12-01T23:59:59.000Z

270

Pending Issues In Decommissioning Of Nuclear Installations In Developing Countries  

E-Print Network (OSTI)

While decommissioning technology and infrastructures are reasonably mature in fully developed countries at the beginning of the third millennium, this is not necessarily the case for some developing countries. It is unfortunate that many of these countries have given little or no attention to early planning and creation of infrastructures for the decommissioning of their nuclear installations, which in many cases are candidates for permanent shutdown in the near future. Critical areas include inter alia (1) poor or no allocation of decommissioning funds, (2) uncertain availability of affordable technologies, (3) unclear definition of roles and responsibilities including lack of regulations, (4) inadequate management and organization techniques, (5) perceived low priority and weak political support, and (6) lack of human and technical resources, particularly in the long term. The International Atomic Energy Agency (IAEA) is a unique forum to identify and address current and prospecti...

Michele Laraia International

2000-01-01T23:59:59.000Z

271

Modlisation, simulation et contrle des installations cryogniques du CERN  

E-Print Network (OSTI)

Cette thse prsente le dveloppement d'un simulateur de processus cryogniques de grande taille appliqu aux installations cryogniques de l'acclrateur de particules LHC (Large Hadron Collider) au CERN (Organisation Europenne pour la Recherche Nuclaire). Ce simulateur est bas sur une approche de modlisation oriente objet o chaque quipement (changeur, turbine, compresseur, etc.) est reprsent partir d'un ensemble d'quations physiques algbro-diffrentielles. L'architecture de contrle du CERN est galement simule en intgrant le contrle ralis par des automates programmables (PLC) avec le systme de supervision. Ce simulateur t dvelopp pour servir diffrents desseins comme l'entranement des oprateurs, la vrification des programmes automates (virtual commissioning) et l'optimisation des stratgies de contrle. Le systme cryognique d'un dtecteur de particules (CMS) a d'abord t simul pour valider les modles, puis un liqufacteur d'...

Bradu, Benjamin; Gayet, P

2010-01-01T23:59:59.000Z

272

Proceedings of the 1st Installation Waste to Energy Workshop  

E-Print Network (OSTI)

Approved for public release; distribution is unlimited. Prepared for U.S. Army Corps of Engineers Washington, DC 20314-1000ERDC/CERL TR-08-11 ii Abstract: This first-ever waste to energy (WTE) workshop gathered Army environmental and energy subject matter experts to explore WTE at the installation and forward operating level. Historically, the Army environmental community has focused on solid waste disposal and the energy community on energy efficiency and power delivery, with no orchestrated integration of the two. The Energy Branch of the U.S. Army Engineer Research and Development Center, Construction Engineering Research Laboratory has been investigating WTE opportunities, and has found little Army analysis on WTE system providers many claims. The goals of this workshop were to share information, spread visibility on

Franklin H. Holcomb; Ren S. Parker; Thomas J. Hartranft; Kurt Preston; Harold R. Sanborn; Philip J. Darcy; Franklin H. Holcomb; Ren S. Parker; Thomas J. Hartranft; Kurt Preston; Harold R. Sanborn; Philip J. Darcy

2008-01-01T23:59:59.000Z

273

Release of radioisotopes and activated materials from nuclear installations and facilities  

Science Conference Proceedings (OSTI)

This report discusses the problems of release of items from facilities and installations where radiation-based activities have been carried out. Several situations are reviewed and their release problems are discussed in detail. Particular attention is devoted to the assessment of the activity of the items to be released. A correct assessment of the activity will help the decision about the final use of the items removed from the radiation-related facility, either re-use, entering the public market, recycling, disposal and storage under different procedures. Even the final destination of the building which hosted the facility needs to be decided on the basis of an accurate assessment of the residual activity. The assessment of the activity, besides being fundamental in guaranteeing a safe approach to the procedures related to the release may result in a substantial profit. This is the case of items whose level of activity is so low that they can be put on the public market, reused or recycled for final product subject to very stringent radiation safety requirements. It will be shown that detector techniques play a fundamental role in the release process. In particular, the low-level counting techniques are fundamental in establishing whether or not the unrestrained release is feasible or not.

Manfredi, P.F.; Millaud, J. E.

2001-11-21T23:59:59.000Z

274

Experimental Evaluation of Installed Cooking Exhaust Fan Performance  

SciTech Connect

The installed performance of cooking exhaust fans was evaluated through residential field experiments conducted on a sample of 15 devices varying in design and other characteristics. The sample included two rear downdraft systems, two under-cabinet microwave over range (MOR) units, three different installations of an under-cabinet model with grease screens across the bottom and no capture hood, two devices with grease screens covering the bottom of a large capture hood (one under-cabinet, one wall-mount chimney), four under-cabinet open hoods, and two open hoods with chimney mounts over islands. Performance assessment included measurement of airflow and sound levels across fan settings and experiments to quantify the contemporaneous capture efficiency for the exhaust generated by natural gas cooking burners.Capture efficiency is defined as the fraction of generated pollutants that are removed through the exhaust and thus not available for inhalation of household occupants. Capture efficiency (CE) was assessed for various configurations of burner use (e.g., single front, single back, combination of one front and one back, oven) and fan speed setting. Measured airflow rates were substantially lower than the levels noted in product literature for many of the units. This shortfall was observed for several units costing in excess of $1000. Capture efficiency varied widely (from<5percent to roughly 100percent) across devices and across conditions for some devices. As expected, higher capture efficiencies were achieved with higher fan settings and the associated higher air flow rates. In most cases, capture efficiencies were substantially higher for rear burners than for front burners. The best and most consistent performance was observed for open hoods that covered all cooktop burners and operated at higher airflow rates. The lowest capture efficiencies were measured when a front burner was used with a rear backdraft system or with lowest fan setting for above the range systems that do not cover the front burners.

Singer, Brett C.; Delp, William W.; Apte, Michael G.

2010-11-01T23:59:59.000Z

275

Experimental Evaluation of Installed Cooking Exhaust Fan Performance  

Science Conference Proceedings (OSTI)

The installed performance of cooking exhaust fans was evaluated through residential field experiments conducted on a sample of 15 devices varying in design and other characteristics. The sample included two rear downdraft systems, two under-cabinet microwave over range (MOR) units, three different installations of an under-cabinet model with grease screens across the bottom and no capture hood, two devices with grease screens covering the bottom of a large capture hood (one under-cabinet, one wall-mount chimney), four under-cabinet open hoods, and two open hoods with chimney mounts over islands. Performance assessment included measurement of airflow and sound levels across fan settings and experiments to quantify the contemporaneous capture efficiency for the exhaust generated by natural gas cooking burners.Capture efficiency is defined as the fraction of generated pollutants that are removed through the exhaust and thus not available for inhalation of household occupants. Capture efficiency (CE) was assessed for various configurations of burner use (e.g., single front, single back, combination of one front and one back, oven) and fan speed setting. Measured airflow rates were substantially lower than the levels noted in product literature for many of the units. This shortfall was observed for several units costing in excess of $1000. Capture efficiency varied widely (fromfan settings and the associated higher air flow rates. In most cases, capture efficiencies were substantially higher for rear burners than for front burners. The best and most consistent performance was observed for open hoods that covered all cooktop burners and operated at higher airflow rates. The lowest capture efficiencies were measured when a front burner was used with a rear backdraft system or with lowest fan setting for above the range systems that do not cover the front burners.

Singer, Brett C.; Delp, William W.; Apte, Michael G.

2010-11-01T23:59:59.000Z

276

Environmental settings for selected US Department of Energy installations - support information for the programmatic environmental impact statement and the baseline environmental management report  

Science Conference Proceedings (OSTI)

This report contains the environmental setting information developed for 25 U.S. Department of Energy (DOE) installations in support of the DOE`s Programmatic Environmental Impact Study (PEIS) and the Baseline Environmental Management Report (BEMR). The common objective of the PEIS and the BEMR is to provide the public with information about the environmental contamination problems associated with major DOE facilities across the country, and to assess the relative risks that radiological and hazardous contaminants pose to the public, onsite workers, and the environment. Environmental setting information consists of the site-specific data required to model (using the Multimedia Environmental Pollutant Assessment System) the atmospheric, groundwater, and surface water transport of contaminants within and near the boundaries of the installations. The environmental settings data describes the climate, atmospheric dispersion, hydrogeology, and surface water characteristics of the installations. The number of discrete environmental settings established for each installation was governed by two competing requirements: (1) the risks posed by contaminants released from numerous waste sites were to be modeled as accurately as possible, and (2) the modeling required for numerous release sites and a large number of contaminants had to be completed within the limits imposed by the PEIS and BEMR schedule. The final product is the result of attempts to balance these competing concerns in a way that minimizes the number of settings per installation in order to meet the project schedule while at the same, time providing adequate, if sometimes highly simplified, representations of the different areas within an installation. Environmental settings were developed in conjunction with installation experts in the fields of meteorology, geology, hydrology, and geochemistry.

Holdren, G.R.; Glantz, C.S.; Berg, L.K.; Delinger, K.; Fosmire, C.J.; Goodwin, S.M.; Rustad, J.R.; Schalla, R.; Schramke, J.A.

1995-05-01T23:59:59.000Z

277

Departments of Energy, Defense Partner to Install Fuel Cell Backup Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Departments of Energy, Defense Partner to Install Fuel Cell Backup Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations July 19, 2011 - 4:56pm Addthis The U.S. Department of Energy (DOE) today announced that as part of an interagency partnership with the U.S. Department of Defense (DOD) to strengthen American energy security and develop new clean energy technologies, DOD will be installing and operating 18 fuel cell backup power systems at eight military installations across the country. The Departments will test how the fuel cells perform in real world operations, identify any technical improvements manufacturers could make to enhance performance, and highlight the benefits of fuel cells for emergency backup

278

Departments of Energy, Defense Partner to Install Fuel Cell Backup Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Departments of Energy, Defense Partner to Install Fuel Cell Backup Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations July 19, 2011 - 4:56pm Addthis The U.S. Department of Energy (DOE) today announced that as part of an interagency partnership with the U.S. Department of Defense (DOD) to strengthen American energy security and develop new clean energy technologies, DOD will be installing and operating 18 fuel cell backup power systems at eight military installations across the country. The Departments will test how the fuel cells perform in real world operations, identify any technical improvements manufacturers could make to enhance performance, and highlight the benefits of fuel cells for emergency backup

279

Departments of Energy, Defense Partner to Install Fuel Cell Backup Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Departments of Energy, Defense Partner to Install Fuel Cell Backup Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations July 19, 2011 - 11:46am Addthis Washington, D.C. - The U.S. Department of Energy (DOE) today announced that as part of an interagency partnership with the U.S. Department of Defense (DOD) to strengthen American energy security and develop new clean energy technologies, DOD will be installing and operating 18 fuel cell backup power systems at eight military installations across the country. The Departments will test how the fuel cells perform in real world operations, identify any technical improvements manufacturers could make to enhance

280

Departments of Energy, Defense Partner to Install Fuel Cell Backup Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy, Defense Partner to Install Fuel Cell Backup Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations July 19, 2011 - 11:46am Addthis Washington, D.C. - The U.S. Department of Energy (DOE) today announced that as part of an interagency partnership with the U.S. Department of Defense (DOD) to strengthen American energy security and develop new clean energy technologies, DOD will be installing and operating 18 fuel cell backup power systems at eight military installations across the country. The Departments will test how the fuel cells perform in real world operations, identify any technical improvements manufacturers could make to enhance performance, and highlight the benefits of fuel cells for emergency backup

Note: This page contains sample records for the topic "installation problems bullet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Measured Energy Savings from Retrofits Installed in Low-Income Housing in a Hot and Humid Climate  

E-Print Network (OSTI)

The Florida Solar Energy Center (FSEC) is metering energy use in a Habitat for Humanity housing development. The objective is to understand the way in which energy is used in low income housing and how it can be effectively reduced. The ten homes come from a conventional housing project built by in 1993 Habitat for Humanity in Homestead, Florida. The instrumentation was installed in the homes in July of 1994 with over three years of 15-minute data collected on all sites. Data were obtained on seven electrical end-uses (air conditioning, heating, hot water, dryer, range, refrigerator, washer/freezer) as well as total. Weather conditions were also monitored as well as interior comfort conditions (temperature and humidity) and hot water consumption and window ventilation status. Baseline field data from a year of monitoring from the ten homes allowed unique insight into how energy is used in low income housing and suggested where consumption might be reduced. In April of 1997, a series of detailed retrofits were applied to eight of the ten Habitat homes. These included solar water heaters installed in seven homes. In eight homes we retrofit light features to compact fluorescent types, repaired and sealed duct air distribution systems, cleaned refrigerator coils and installed low-flow showerheads. Since each of he associated energy end-uses (including hot water consumption) is metered, we are able to assess the relative performance of each of the retrofits. We also measured of air conditioner performance and house tightness. These audits revealed numerous problems, but low-evaporator coil air flow was discovered in all homes. The paper describes the retrofit installation, audit data collected and the impact on measured energy consumption. Preliminary economics are explored.

Parker, D. S.; Sherwin, J. R.; Floyd, D. B.

1998-01-01T23:59:59.000Z

282

Security - Problem Solved?  

Science Conference Proceedings (OSTI)

There are plenty of security problems that have solutions. Yet, our security problems don't seem to be going away. What's wrong here?

John Viega

2005-06-01T23:59:59.000Z

283

Alstom 3-MW Wind Turbine Installed at NWTC (Fact Sheet)  

DOE Green Energy (OSTI)

The 3-MW Alstom wind turbine was installed at NREL's NWTC in October 2010. Test data will be used to validate advanced turbine design and analysis tools. NREL signed a Cooperative Research and Development Agreement with Alstom in 2010 to conduct certification testing on the company's 3-MW ECO 100 wind turbine and to validate models of Alstom's unique drivetrain concept. The turbine was installed at NREL's National Wind Technology Center (NWTC) in October 2010 and engineers began certification testing in 2011. Tests to be conducted by NREL include a power quality test to finalize the International Electrotechnical Commission (IEC) requirements for type certification of the 60-Hz unit. The successful outcome of this test will enable Alstom to begin commercial production of ECO 100 in the United States. NREL also will obtain additional measurements of power performance, acoustic noise, and system frequency to complement the 50 Hz results previously completed in Europe. After NREL completes the certification testing on the ECO 100, it will conduct long-term testing to validate gearbox performance to gain a better understanding of the machine's unique ALSTOM PURE TORQUE{trademark} drivetrain concept. In conventional wind turbines, the rotor is supported by the shaft-bearing gearbox assembly. Rotor loads are partially transmitted to the gearbox and may reduce gearbox reliability. In the ALSTOM PURE TORQUE concept, the rotor is supported by a cast frame running through the hub, which transfers bending loads directly to the tower. Torque is transmitted to the shaft through an elastic coupling at the front of the hub. According to Alstom, this system will increase wind turbine reliability and reduce operation and maintenance costs by isolating the gearbox from rotor loads. Gearbox reliability has challenged the wind energy industry for more than two decades. Gearbox failures require expensive and time-consuming replacement, significantly increasing the cost of wind plant operation while reducing the plant's power output and revenue. To solve gearbox reliability issues, NREL launched a Gearbox Reliability Collaborative (GRC) in 2006 and brought together the world's leading turbine manufacturers, consultants, and experts from more than 30 companies and organizations. GRC's goal was to validate the typical design process-from wind turbine system loads to bearing ratings-through a comprehensive dynamometer and field-test program. Design analyses will form a basis for improving reliability of future designs and retrofit packages. Through its study of Alstom's Eco 100 gearbox, NREL can compare its GRC model gearbox with Alstom's and add the results to the GRC database, which is helping to advance more reliable wind turbine technology.

Not Available

2011-09-01T23:59:59.000Z

284

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009  

E-Print Network (OSTI)

from 1998-2009 Tracking the Sun III: The Installed Cost ofSystems MW Total Tracking the Sun III: The Installed Cost ofthrough 2009. Tracking the Sun III: The Installed Cost of

Barbose, Galen

2011-01-01T23:59:59.000Z

285

Photovoltaics Design and Installation Manual | Open Energy Information  

Open Energy Info (EERE)

Photovoltaics Design and Installation Manual Photovoltaics Design and Installation Manual Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Photovoltaics Design and Installation Manual Agency/Company /Organization: Solar Energy International Sector: Energy Focus Area: Renewable Energy, Solar, - Solar PV Resource Type: Training materials User Interface: Other Website: www.solarenergy.org/bookstore/photovoltaics-design-installation-manual Cost: Paid Language: "English, Spanish; Castilian" is not in the list of possible values (Abkhazian, Achinese, Acoli, Adangme, Adyghe; Adygei, Afar, Afrihili, Afrikaans, Afro-Asiatic languages, Ainu, Akan, Akkadian, Albanian, Aleut, Algonquian languages, Altaic languages, Amharic, Angika, Apache languages, Arabic, Aragonese, Arapaho, Arawak, Armenian, Aromanian; Arumanian; Macedo-Romanian, Artificial languages, Assamese, Asturian; Bable; Leonese; Asturleonese, Athapascan languages, Australian languages, Austronesian languages, Avaric, Avestan, Awadhi, Aymara, Azerbaijani, Balinese, Baltic languages, Baluchi, Bambara, Bamileke languages, Banda languages, Bantu (Other), Basa, Bashkir, Basque, Batak languages, Beja; Bedawiyet, Belarusian, Bemba, Bengali, Berber languages, Bhojpuri, Bihari languages, Bikol, Bini; Edo, Bislama, Blin; Bilin, Blissymbols; Blissymbolics; Bliss, Bosnian, Braj, Breton, Buginese, Bulgarian, Buriat, Burmese, Caddo, Catalan; Valencian, Caucasian languages, Cebuano, Celtic languages, Central American Indian languages, Central Khmer, Chagatai, Chamic languages, Chamorro, Chechen, Cherokee, Cheyenne, Chibcha, Chichewa; Chewa; Nyanja, Chinese, Chinook jargon, Chipewyan; Dene Suline, Choctaw, Chuukese, Chuvash, Classical Newari; Old Newari; Classical Nepal Bhasa, Classical Syriac, Coptic, Cornish, Corsican, Cree, Creek, Creoles and pidgins , Crimean Tatar; Crimean Turkish, Croatian, Cushitic languages, Czech, Dakota, Danish, Dargwa, Delaware, Dinka, Divehi; Dhivehi; Maldivian, Dogri, Dogrib, Dravidian languages, Duala, Dutch; Flemish, Dyula, Dzongkha, Eastern Frisian, Efik, Egyptian (Ancient), Ekajuk, Elamite, English, Erzya, Esperanto, Estonian, Ewe, Ewondo, Fang, Fanti, Faroese, Fijian, Filipino; Pilipino, Finnish, Finno-Ugrian languages, Fon, French, Friulian, Fulah, Ga, Gaelic; Scottish Gaelic, Galibi Carib, Galician, Ganda, Gayo, Gbaya, Geez, Georgian, German, Germanic languages, Gilbertese, Gondi, Gorontalo, Gothic, Grebo, Greek, Modern, Guarani, Gujarati, Gwich'in, Haida, Haitian; Haitian Creole, Hausa, Hawaiian, Hebrew, Herero, Hiligaynon, Himachali languages; Western Pahari languages, Hindi, Hiri Motu, Hittite, Hmong; Mong, Hungarian, Hupa, Iban, Icelandic, Ido, Igbo, Ijo languages, Iloko, Inari Sami, Indic languages, Indo-European languages, Indonesian, Ingush, Interlingue; Occidental, Inuktitut, Inupiaq, Iranian languages, Irish, Iroquoian languages, Italian, Japanese, Javanese, Judeo-Arabic, Judeo-Persian, Kabardian, Kabyle, Kachin; Jingpho, Kalaallisut; Greenlandic, Kalmyk; Oirat, Kamba, Kannada, Kanuri, Kara-Kalpak, Karachay-Balkar, Karelian, Karen languages, Kashmiri, Kashubian, Kawi, Kazakh, Khasi, Khoisan languages, Khotanese; Sakan, Kikuyu; Gikuyu, Kimbundu, Kinyarwanda, Kirghiz; Kyrgyz, Klingon; tlhIngan-Hol, Komi, Kongo, Konkani, Korean, Kosraean, Kpelle, Kru languages, Kuanyama; Kwanyama, Kumyk, Kurdish, Kurukh, Kutenai, Ladino, Lahnda, Lamba, Land Dayak languages, Lao, Latin, Latvian, Lezghian, Limburgan; Limburger; Limburgish, Lingala, Lithuanian, Lojban, Lower Sorbian, Lozi, Luba-Katanga, Luba-Lulua, Luiseno, Lule Sami, Lunda, Luo (Kenya and Tanzania), Lushai, Luxembourgish; Letzeburgesch, Macedonian, Madurese, Magahi, Maithili, Makasar, Malagasy, Malay, Malayalam, Maltese, Manchu, Mandar, Mandingo, Manipuri, Manobo languages, Manx, Maori, Mapudungun; Mapuche, Marathi, Mari, Marshallese, Marwari, Masai, Mayan languages, Mende, Mi'kmaq; Micmac, Minangkabau, Mirandese, Mohawk, Moksha, Mon-Khmer languages, Mongo, Mongolian, Mossi, Multiple languages, Munda languages, N'Ko, Nahuatl languages, Nauru, Navajo; Navaho, Ndebele, North; North Ndebele, Ndebele, South; South Ndebele, Ndonga, Neapolitan, Nepal Bhasa; Newari, Nepali, Nias, Niger-Kordofanian languages, Nilo-Saharan languages, Niuean, North American Indian languages, Northern Frisian, Northern Sami, Norwegian, Nubian languages, Nyamwezi, Nyankole, Nyoro, Nzima, Occitan (post 1500); Provençal, Ojibwa, Oriya, Oromo, Osage, Ossetian; Ossetic, Otomian languages, Pahlavi, Palauan, Pali, Pampanga; Kapampangan, Pangasinan, Panjabi; Punjabi, Papiamento, Papuan languages, Pedi; Sepedi; Northern Sotho, Persian, Philippine languages, Phoenician, Pohnpeian, Polish, Portuguese, Prakrit languages, Pushto; Pashto, Quechua, Rajasthani, Rapanui, Rarotongan; Cook Islands Maori, Romance languages, Romanian; Moldavian; Moldovan, Romansh, Romany, Rundi, Russian, Salishan languages, Samaritan Aramaic, Sami languages, Samoan, Sandawe, Sango, Sanskrit, Santali, Sardinian, Sasak, Scots, Selkup, Semitic languages, Serbian, Serer, Shan, Shona, Sichuan Yi; Nuosu, Sicilian, Sidamo, Sign Languages, Siksika, Sindhi, Sinhala; Sinhalese, Sino-Tibetan languages, Siouan languages, Skolt Sami, Slave (Athapascan), Slavic languages, Slovak, Slovenian, Sogdian, Somali, Songhai languages, Soninke, Sorbian languages, Sotho, Southern, South American Indian (Other), Southern Altai, Southern Sami, Spanish; Castilian, Sranan Tongo, Sukuma, Sumerian, Sundanese, Susu, Swahili, Swati, Swedish, Swiss German; Alemannic; Alsatian, Syriac, Tagalog, Tahitian, Tai languages, Tajik, Tamashek, Tamil, Tatar, Telugu, Tereno, Tetum, Thai, Tibetan, Tigre, Tigrinya, Timne, Tiv, Tlingit, Tok Pisin, Tokelau, Tonga (Nyasa), Tonga (Tonga Islands), Tsimshian, Tsonga, Tswana, Tumbuka, Tupi languages, Turkish, Turkmen, Tuvalu, Tuvinian, Twi, Udmurt, Ugaritic, Uighur; Uyghur, Ukrainian, Umbundu, Uncoded languages, Undetermined, Upper Sorbian, Urdu, Uzbek, Vai, Venda, Vietnamese, Volapük, Votic, Wakashan languages, Walamo, Walloon, Waray, Washo, Welsh, Western Frisian, Wolof, Xhosa, Yakut, Yao, Yapese, Yiddish, Yoruba, Yupik languages, Zande languages, Zapotec, Zaza; Dimili; Dimli; Kirdki; Kirmanjki; Zazaki, Zenaga, Zhuang; Chuang, Zulu, Zuni) for this property.

286

Great Plaines installs directionally drilled crossings in Texas  

SciTech Connect

This paper reports on installing a five- line wide, one-line long products system for ARCO Pipe Line Co. (APLC) in a crowded utility right of way required Great Plains Pipeline Construction Co. to complete three directionally drilled crossings and over 50 conventional bored crossings in the Channelview, Texas area. The pipe line route closely parallels a 4-mi ROW section of Houston Power and Light Co. (HP and L) and about 4 mi of Union Pacific Railroad tracks. Due to overhead towers carrying high-voltage electric transmission lines, Great Plains bored under the existing towers in HP and L's easement to preserve the right of way for future tower expansion. Laney, Inc., subcontracted the conventional bores underneath towers and minor roads. Laney Directional Drilling Co. was the prime contractor for two horizontal directionally drilled crossings of the Houston Ship Channel and Carpenter's Bayou. Great Plains, with its own crew, completed three roadway crossings in high-traffic areas. Engineering and material procurement was handled by APLC.

Thiede, K.L.

1991-09-01T23:59:59.000Z

287

Integrated dynamic landscape analysis and modeling system (IDLAMS) : installation manual.  

SciTech Connect

The Integrated Dynamic Landscape Analysis and Modeling System (IDLAMS) is a prototype, integrated land management technology developed through a joint effort between Argonne National Laboratory (ANL) and the US Army Corps of Engineers Construction Engineering Research Laboratories (USACERL). Dr. Ronald C. Sundell, Ms. Pamela J. Sydelko, and Ms. Kimberly A. Majerus were the principal investigators (PIs) for this project. Dr. Zhian Li was the primary software developer. Dr. Jeffrey M. Keisler, Mr. Christopher M. Klaus, and Mr. Michael C. Vogt developed the decision analysis component of this project. It was developed with funding support from the Strategic Environmental Research and Development Program (SERDP), a land/environmental stewardship research program with participation from the US Department of Defense (DoD), the US Department of Energy (DOE), and the US Environmental Protection Agency (EPA). IDLAMS predicts land conditions (e.g., vegetation, wildlife habitats, and erosion status) by simulating changes in military land ecosystems for given training intensities and land management practices. It can be used by military land managers to help predict the future ecological condition for a given land use based on land management scenarios of various levels of training intensity. It also can be used as a tool to help land managers compare different land management practices and further determine a set of land management activities and prescriptions that best suit the needs of a specific military installation.

Li, Z.; Majerus, K. A.; Sundell, R. C.; Sydelko, P. J.; Vogt, M. C.

1999-02-24T23:59:59.000Z

288

Resource Form Factor and Installation of GFA Controllers  

SciTech Connect

The focus of this task is to optimize the form and placement of a controller comprising the Grid Friendly appliance (GFA) controller, power supply and power relay (and/or a solid-state power electronic switch) that would command a domestic water heater to shed its load in response to stress on the electric power grid. The GFA controller would disconnect the water heater from its supply circuit whenever it senses a low voltage signal or other indicators of system stress communicated via the electric power distribution system. Power would be reconnected to the appliance when the GFA controller senses the absence of these signals. This project has also considered more frequent cycling of this controllers relay switch to perform demand-side frequency regulation. The principal criteria considered in this optimization are reliability, cost and life expectancy of the GFA components. The alternative embodiments of the GFA equipment under consideration are: Option 1- installation inside the insulation space of the water heater between the tank and jacket Option 2 containment in a separate nearby electrical enclosure Option 3 - as a modification or adjunct to the distribution panel housing and/or the breaker that protects the water heater supply circuit.

DeSteese, John G.; Hammerstrom, Donald J.

2009-11-15T23:59:59.000Z

289

Solar heating system installed at Stamford, CT. Final report  

DOE Green Energy (OSTI)

Information is provided on the solar heating system installed at the Lutz-Sotire Partnership Executive East Office Building, Stamford, Connecticut. The information consists of description of system and components, operation and maintenance manual, as-built drawings and manufacturer's component data. The solar system was designed to provide approximately 50 percent of the heating requirements. The solar facility has 2,561 sq. ft. of liquid flat plate collectors and a 6000 gallon, stone lined, well-insulated storage tank. Freeze protection is provided by a 50 percent glycol/water mixture in the collector loop. From the storage tank, solar heated water is fed into the building's distributed heat pump loop via a modulating three-way valve. If the storage tank temperature drops below 80/sup 0/F, the building loop may be supplied from the existing electrical hot water boilers. The Executive East Office Building is of moderate size, 25,000 sq. ft. of heated space in 2 1/2 stories. The solar system makes available for other users up to 150 KVA of existing electrical generating capacity.

Not Available

1979-09-01T23:59:59.000Z

290

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009  

E-Print Network (OSTI)

wholesale module prices and PV system installations (owinglag between wholesale module price movements and PV systemmodule prices and retail installed costs for PV systems, the

Barbose, Galen

2011-01-01T23:59:59.000Z

291

DEMONSTRATiON OF A SUBSURFACE CONTAINMENT SYSTEM FOR INSTALLATION AT DOE WASTE SITES  

SciTech Connect

Between 1952 and 1970, DOE buried mixed waste in pits and trenches that now have special cleanup needs. The disposal practices used decades ago left these landfills and other trenches, pits, and disposal sites filled with three million cubic meters of buried waste. This waste is becoming harmful to human safety and health. Today's cleanup and waste removal is time-consuming and expensive with some sites scheduled to complete cleanup by 2006 or later. An interim solution to the DOE buried waste problem is to encapsulate and hydraulically isolate the waste with a geomembrane barrier and monitor the performance of the barrier over its 50-yr lifetime. The installed containment barriers would isolate the buried waste and protect groundwater from pollutants until final remediations are completed. The DOE has awarded a contract to RAHCO International, Inc.; of Spokane, Washington; to design, develop, and test a novel subsurface barrier installation system, referred to as a Subsurface Containment System (SCS). The installed containment barrier consists of commercially available geomembrane materials that isolates the underground waste, similar to the way a swimming pools hold water, without disrupting hazardous material that was buried decades ago. The barrier protects soil and groundwater from contamination and effectively meets environmental cleanup standards while reducing risks, schedules, and costs. Constructing the subsurface containment barrier uses a combination of conventional and specialized equipment and a unique continuous construction process. This innovative equipment and construction method can construct a 1000-ft-long X 34-ft-wide X 30-ft-deep barrier at construction rates to 12 Wday (8 hr/day operation). Life cycle costs including RCRA cover and long-term monitoring range from approximately $380 to $590/cu yd of waste contained or $100 to $160/sq ft of placed barrier based upon the subsurface geology surrounding the waste. Project objectives for Phase I were to validate the SCS construction equipment and process, evaluate the system performance, validate the barrier constructability, and assess the barrier effectiveness. The objectives for Phase 11, which is a full-scale demonstration at a DOE site, are to perform an extensive characterization of the test site, to demonstrate the equipment and the installation process under site-specific performance and regulatory requirements, to validate the operational performance of the equipment, and to perform long-term verification of the barrier using monitoring wells. To date, significant progress has been made to establish the technical and economical feasibility of the SCS. This report describes the SCS conventional and specialized equipment, barrier materials, and construction process. It presents results of the specialized equipment Factory Test, the SCS Control Test and the SCS Advance Control Test at the RAHCO facility. Provided herein are the system performance capabilities and an estimated construction cost and schedule for a 1000-ft-long X 34-ft-wide X 29-ft-deep containment barrier at the DOE Oak Ridge Bear Creek Burial Grounds are also provided.

Thomas J. Crocker; Verna M. Carpenter

2003-05-21T23:59:59.000Z

292

Sundance, Skiing and Solar: Park City to Install New PV System | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sundance, Skiing and Solar: Park City to Install New PV System Sundance, Skiing and Solar: Park City to Install New PV System Sundance, Skiing and Solar: Park City to Install New PV System October 25, 2010 - 10:49am Addthis Park City, UT has completed several green projects recently. The town is installing a solar energy system on top of the Marsac Building at the end of the month. | Photo courtesy of Park City | Park City, UT has completed several green projects recently. The town is installing a solar energy system on top of the Marsac Building at the end of the month. | Photo courtesy of Park City | Paul Lester Communications Specialist for the Office of Energy Efficiency and Renewable Energy What does this project do? 80-panel solar energy system to be installed at Park City's Marsac Building. Recovery Act-funded system to generate up to 15% of the building's

293

Obama Administration Announces Plans to Install New Solar Panels on the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Announces Plans to Install New Solar Panels on Announces Plans to Install New Solar Panels on the White House Residence Obama Administration Announces Plans to Install New Solar Panels on the White House Residence October 5, 2010 - 12:00am Addthis WASHINGTON - U.S. Energy Secretary Steven Chu and Council of Environmental Quality (CEQ) Chair Nancy Sutley today announced plans to install solar panels and a solar hot water heater on the roof of the White House Residence. These two solar installations will be part of a Department of Energy demonstration project showing that American solar technologies are available, reliable, and ready for installation in homes throughout the country. Secretary Chu and Chair Sutley made the announcement during CEQ's 2010 GreenGov Symposium, which is bringing together leaders from Federal,

294

This Flash transmits the second installment under this project. Additional insta  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

This Flash transmits the second installment under this project. Additional installments This Flash transmits the second installment under this project. Additional installments will follow as they are completed. There are two significant chapter revisions in this installment: 6.1, Competition; and 35.1, Scientific and Technical Information. There are also five primarily editorial chapter revisions in this installment, though the revisions include some updated materials as well: 17.2, Cost Participation; 17.4 Program Opportunity Notices; 17.5 Program Research and Development Notices; 22.1, Labor Standards for Construction; and 47.1, Transportation - Air Charter. Finally, three chapters have been removed. Chapter 45, Government Property, was removed because the coverage was obsolete. Chapter 70.1, Cost Participation, was removed because it was duplicative of 17.2 and inappropriate in

295

Expert Meeting Report: Achieving the Best Installed Performance from High-Efficiency Residential Gas Furnaces  

SciTech Connect

This report describes a Building America expert meeting hosted on July 28, 2011, by the Partnership for Advanced Residential Retrofit team. The purpose of this meeting was to identify installation practices that provide the best installed efficiency for residential gas furnaces, explain how AFUE and field efficiency can differ, and investigate the impact of installation practices on the efficiency and long-term durability of the furnace.

Brand, L.

2012-03-01T23:59:59.000Z

296

Problems of Silica Scaling at Cerro Prieto Geothrmal Power Station  

DOE Green Energy (OSTI)

In the Cerro Prieto Geothermal field, where the predominant fluid in the reservoir is water, they have had problems with silica and other deposits in the first exploration wells as well as in production wells. Scaling problems have also been encountered in silencers, cyclone separators, drains, water pipes, etc. Some scale problems have also been encountered in the turbine blades of the geothermal electric plant. Most of these problems have been solved by corrective procedures which, in some cases, have turned into routine. Scale deposition is a problem that certainly diminishes the useful capacity of geothermal fluids with water predominance, but it does not actually endanger the installations, since this problem is under control.

Mercado, S.; Guiza, J.

1976-01-01T23:59:59.000Z

297

Microsoft Word - NO-MM-827 New Orleans Emergency Generator Installation (900 building).docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MM-827 MM-827 Title: New Orleans Emergency Generator Installation (900 Building) Description: Subcontractor shall provide all labor, tools, materials, equipment, and supervision required to relocate the New Orleans emergency generator at the 900 building, to install a new Automatic Transfer Switch, and to provide generator status alarms. Tasks includes construction of a new concrete slab foundation, relocation of the existing portable generator from the trailer to the foundation, electrical installation of the generator, installation of fencing around the generator, and miscellaneous architectural work. Some of the existing equipment and components being dismantled, removed or demolished have been designated for government salvage. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021)

298

inverters, offering less weight, higher efficiency, and lower-cost installations.  

E-Print Network (OSTI)

to 10 pounds per square foot of dead weight to the roof structural members, concentrated throughinverters, offering less weight, higher efficiency, and lower- cost installations. The electrical

Johnson, Eric E.

299

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

E-Print Network (OSTI)

to Drive Wind Development. . . . . . . . . . . . . . .5 GE Wind Is the Dominant Turbine Manufacturer, with SiemensAnnual Report on U.S. Wind Power Installation, Cost, and

2008-01-01T23:59:59.000Z

300

Fiscal year 1996 well installation program summary, Y-12 Plant Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

This report summarizes the well installation activities conducted during the federal fiscal year (FY) 1996 drilling program at the Oak Ridge Y-12 Plant, Oak Ridge Tennessee. Synopses of monitoring well construction/well development data, well location rationale, geological/hydrological observations, quality assurance/quality control methods, and health and safety monitoring are included. Two groundwater monitoring wells were installed during the FY 1996 drilling program. One of the groundwater monitoring wells was installed in the Lake Reality area and was of polyvinyl chloride screened construction. The other well, installed near the Ash Disposal Basin, was of stainless steel construction.

NONE

1997-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "installation problems bullet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Deficiencies of Lighting Codes and Ordinances in Controlling Light Pollution from Parking Lot Lighting Installations.  

E-Print Network (OSTI)

??The purpose of this research was to identify the main causes of light pollution from parking lot electric lighting installations and highlight the deficiencies of (more)

Royal, Emily

2012-01-01T23:59:59.000Z

302

The strength of a knitted home: retrieving histories through Janet Morton's wool installations.  

E-Print Network (OSTI)

??This thesis focuses on the ways in which Janet Mortons installations explore geographic and architectural spatial arrangements, and the ways in which these arrangements reproduce (more)

Rothwell, Emily Jane

2007-01-01T23:59:59.000Z

303

Table 11.6 Installed Nameplate Capacity of Fossil-Fuel Steam ...  

U.S. Energy Information Administration (EIA)

Table 11.6 Installed Nameplate Capacity of Fossil-Fuel Steam-Electric Generators With Environmental Equipment, 1985-2010 (Megawatts)

304

How many smart meters are installed in the U.S. and who has them ...  

U.S. Energy Information Administration (EIA)

How many smart meters are installed in the U ... Other information on smart meter deployments funded by the Smart Grid Investment Grant program under the American ...

305

Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008  

E-Print Network (OSTI)

cost data for 2009 indicates that the average cost of projects installed through the California Solar

Barbose, Galen L

2010-01-01T23:59:59.000Z

306

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009  

E-Print Network (OSTI)

capacity installed in the United States through 2009 and representing one of the most comprehensive sources

Barbose, Galen

2011-01-01T23:59:59.000Z

307

Symmetry in Scheduling Problems  

E-Print Network (OSTI)

Nov 16, 2010 ... 2 Problem Symmetry and Fundamental Domains ...... Handbook of Computational Group Theory (Discrete Mathematics and Its Applica- tions).

308

Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from  

NLE Websites -- All DOE Office Websites (Extended Search)

Sun: The Installed Cost of Photovoltaics in the U.S. from Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007 Title Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007 Publication Type Report Refereed Designation Unknown Year of Publication 2009 Authors Wiser, Ryan H., Galen L. Barbose, and Carla Peterman Pagination 42 Date Published 02/2009 Publisher LBNL City Berkeley Keywords electricity markets and policy group, energy analysis and environmental impacts department, photovoltaics, power system economics, renewable energy Abstract As installations of grid-connected solar photovoltaic (PV) systems have grown, so too has the desire to track the installed cost of these systems over time, by system characteristics, by system location, and by component. This report helps to fill this need by summarizing trends in the installed cost of grid-connected PV systems in the United States from 1998 through 2007. The report is based on an analysis of installed cost data from nearly 37,000 residential and non-residential PV systems, totaling 363 MW of capacity, and representing 76% of all grid-connected PV capacity installed in the U.S. through 2007.

309

Tracking the Sun III The Installed Cost of Photovoltaics in the U.S. from  

NLE Websites -- All DOE Office Websites (Extended Search)

Tracking the Sun III The Installed Cost of Photovoltaics in the U.S. from Tracking the Sun III The Installed Cost of Photovoltaics in the U.S. from 1998-2009 Title Tracking the Sun III The Installed Cost of Photovoltaics in the U.S. from 1998-2009 Publication Type Report Refereed Designation Unknown Year of Publication 2010 Authors Barbose, Galen L., Naïm Darghouth, and Ryan H. Wiser Pagination 54 Date Published 12/2010 Publisher LBNL City Berkeley Keywords distributed energy resources (der), electricity markets and policy group, energy analysis and environmental impacts department, energy markets, photovoltaics Abstract As the deployment of grid-connected solar photovoltaic (PV) systems has increased, so too has the desire to track the installed cost of these systems over time and by location, customer type, system characteristics, and component. This report helps to fill this need by summarizing trends in the installed cost1 of grid-connected PV systems in the United States from 1998 through 2009 (updating two previous reports with data through 2007 and 2008, respectively), and providing preliminary cost trends for systems installed in 2010. The analysis is based on installed cost data for approximately 78,000 residential and non-residential PV systems, totaling 874 megawatts (MW) and representing 70% of all grid-connected PV capacity installed in the United States through 2009.

310

Bateau ivre: an artistic markerless outdoor mobile augmented reality installation on a riverboat  

Science Conference Proceedings (OSTI)

Bateau Ivre is a project presented on the Seine River to make a large audience aware of the possible developments of Augmented Reality through an artistic installation in a mobile outdoor environment. The installation could be viewed from a ship ... Keywords: augmented reality, heritage, mobile augmented reality, outdoor digital art, real-time image processing

Christian Jacquemin; Wai Kit Chan; Mathieu Courgeon

2010-10-01T23:59:59.000Z

311

Capstone C60 Microturbine as a Water Heater and Standby Generator: Installation at Tomoka Correctional Institution  

Science Conference Proceedings (OSTI)

A Capstone C60 microturbine and matched Unifin heat recovery heat exchanger were installed as a water heater in the laundry of the Tomoka Correctional Institution in Daytona, Florida. This report chronicles the design, installation, and early operations of the project.

2005-03-29T23:59:59.000Z

312

Lessons Learned from Net Zero Energy Assessments and Renewable Energy Projects at Military Installations  

SciTech Connect

Report highlights the increase in resources, project speed, and scale that is required to achieve the U.S. Department of Defense (DoD) energy efficiency and renewable energy goals and summarizes the net zero energy installation assessment (NZEI) process and the lessons learned from NZEI assessments and large-scale renewable energy projects implementations at DoD installations.

Callahan, M.; Anderson, K.; Booth, S.; Katz, J.; Tetreault, T.

2011-09-01T23:59:59.000Z

313

Harmonic filters influences regarding the power quality on high frequency electrothermal installation with electromagnetic induction  

Science Conference Proceedings (OSTI)

This paper presents a study regarding the functioning of a melting/hardening electrothermal installation with electromagnetic induction from the point of view of generated harmonics in the power distribution. The authors made simulations in scope of ... Keywords: electrothermal installation, harmonic, passive filters, static converter

Raluca Rob; Ioan Sora; Caius Panoiu; Manuela Panoiu

2010-01-01T23:59:59.000Z

314

Recent developments on the high power ECH installation at the DIII-D tokamak  

Science Conference Proceedings (OSTI)

The 110 GHz gyrotron installation on the DIII-D tokamak has been upgraded to three tubes in the megawatt class with plans for further upgrades. The latest addition uses a diamond output window. The report describes the installation, plans, and experimental results to date.

Lohr, J.; Ponce, D.; Callis, R.W.; Doane, J.L.; Ikezi, H.; Moeller, C.P.

1998-09-01T23:59:59.000Z

315

Diode (LED) Fixture Design and Installation Criteria for Interior and Exterior Lighting Applications  

E-Print Network (OSTI)

1. Purpose. This ETL provides technical guidance and criteria for specifying, designing, and installing LED luminaires for interior and exterior lighting applications at Air Force installations. This ETL does not apply to LED airfield lighting systems, including, but not limited to, taxiway, obstruction, runway edge, threshold, or approach lighting systems

unknown authors

2010-01-01T23:59:59.000Z

316

Installation package for 77-180 SOLARSTAT and 77-171 controller  

DOE Green Energy (OSTI)

The information necessary to install, operate, and maintain Solar Control Corporation's Solar Thermostat ''Solarstat'' and their ''Basic Modular Controller'' is given. Contained within the report are the Installation, Operation, and Maintenance Manuals, Specifications, standard features and the Underwriter Labs Certification Statement.

Not Available

1978-07-01T23:59:59.000Z

317

Lyman Maynard Stowe Library 1 of 5 PDA Troubleshooting Shots 2006 Install (Windows Mobile 5)  

E-Print Network (OSTI)

Lyman Maynard Stowe Library 1 of 5 PDA Troubleshooting Shots 2006 Install (Windows Mobile 5) Step 1 Stowe Library 2 of 5 PDA Troubleshooting Shots 2006 Install (Windows Mobile 5) Step 2: Copy The Downloaded Files To Your PDA o Maximize the ActiveSync Window o Click on the Explore button o Drag and drop

Kim, Duck O.

318

Problems in the administration of state solar legislation  

DOE Green Energy (OSTI)

Solar legislation may 1) stimulate research and development, 2) encourage solar installation by governmental incentives, or 3) contribute to the elimination of institutional barriers. Legislation that attempts to deal with a wide range of problems will touch many different departments and agencies in state government. Proper administration is essential to the effectiveness of such legislation. The Federal Government is also involved in extensive programs to foster the commercialization of solar technology. The programs and standards that they evolve create another set of administrative rules and regulations that the solar manufacturer, seller, installer, or consumer has to face. This paper focuses on the experience of California, Oregon, and New Mexico, and suggests methods to avoid administrative difficulties that have slowed some solar initiatives. Several common problems are identified: inadequate definition of important terms, ineffective delegation of administrative responsibilities, and insufficient coordination with other state and federal solar programs.

Warren, M.

1979-07-01T23:59:59.000Z

319

Commissioning Measurements and Experience Obtained from the Installation of a Fissile Mass Flow monitor in the URAL Electrochemical Integrated Plant (UEIP) in Novouralsk  

SciTech Connect

The Blend Down Monitoring System (BDMS) equipment sent earlier to the Ural Electrochemical Integrated Plant (UEIP) at Novouralsk, Russia, was installed and implemented successfully on February 2, 1999. The BDMS installation supports the highly enriched uranium (HEU) Transparency Implementation Program for material subject to monitoring under the HEU purchase agreement between the United States of America (USA) and the Russian Federation (RF). The BDMS consists of the Oak Ridge National Laboratory (ORNL) Fissile (uranium-235) Mass Flow Monitor (FMFM) and the Los Alamos National Laboratory (LANL) Enrichment Monitor (EM). Two BDMS?s for monitoring the Main and Reserve HEU blending process lines were installed at UEIP. Independent operation of the FMFM Main and FMFM Reserve was successfully demonstrated for monitoring the fissile mass flow as well as the traceability of HEU to the product low enriched uranium. The FMFM systems failed when both systems were activated during the calibration phase due to a synchronization problem between the systems. This operational failure was caused by the presence of strong electromagnetic interference (EMI) in the blend point. The source-modulator shutter motion of the two FMFM systems was not being properly synchronized because of EMI producing a spurious signal on the synchronization cable connecting the two FMFM cabinets. The signature of this failure was successfully reproduced at ORNL after the visit. This unexpected problem was eliminated by a hardware modification and software improvements during a recent visit (June 9-11, 1999) to UEIP, and both systems are now operating as expected.

March-Leuba, J.; Mastal, E.; Powell, D.; Sumner, J.; Uckan, T.; Vines, V.

1999-07-25T23:59:59.000Z

320

Solar heating and hot water system installed at the Senior Citizen Center, Huntsville, Alabama. [Includes engineering drawings  

DOE Green Energy (OSTI)

Information is provided on the solar energy system installed at the Huntsville Senior Citizen Center. The solar space heating and hot water facility and the project involved in its construction are described in considerable detail and detailed drawings of the complete system and discussions of the planning, the hardware, recommendations, and other pertinent information are included. The facility was designed to provide 85 percent of the hot water and 85 percent of the space heating requirements. Two important factors concerning this project for commercial demonstration are the successful use of silicon oil as a heat transfer fluid and the architecturally aesthetic impact of a large solar energy system as a visual centerpoint. There is no overheat or freeze protection due to the characteristics of the silicon oil and the design of the system. Construction proceeded on schedule with no cost overruns. It is designed to be relatively free of scheduled maintenance, and has experienced practically no problems.

Not Available

1980-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "installation problems bullet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

OPTICS5  

NLE Websites -- All DOE Office Websites (Extended Search)

Optics5 (5.1.02) Knowledge Base Optics5 (5.1.02) Knowledge Base Last Updated: 09/11/13 Table of Contents INSTALLATION EXECUTION bullet ** Operating Systems -- Microsoft Windows 7 and Vista ** bullet ** Running Optics5 with Microsoft Windows 7 and Vista ** bullet ** Running Optics5 with Microsoft Windows 7 and Vista 64 bit ** Optics5 may not work correctly with regional/locale settings using "," as a decimal separator. bullet Which Windows operating systems can be used to run Optics? "Class Does Not Support Automation or Expected Interface" error message bullet How much hard disk space should be available to install Optics? Optics user manual bullet I receive a virus warning (nimda-virus) when installing Optics. What should I do? NFRC Procedure for Applied Films bullet I have installed Optics but I can't find the program or the icon.

322

Tracking the Sun II The Installed Cost of Photovoltaics in the U.S. from  

NLE Websites -- All DOE Office Websites (Extended Search)

Tracking the Sun II The Installed Cost of Photovoltaics in the U.S. from Tracking the Sun II The Installed Cost of Photovoltaics in the U.S. from 1998-2008 Title Tracking the Sun II The Installed Cost of Photovoltaics in the U.S. from 1998-2008 Publication Type Report Refereed Designation Unknown Year of Publication 2009 Authors Wiser, Ryan H., Galen L. Barbose, Carla Peterman, and Naïm Darghouth Pagination 150 Date Published 10/2009 Publisher LBNL City Berkeley Keywords electricity markets and policy group, energy analysis and environmental impacts department, photovoltaics, power system economics, renewable energy Abstract As the deployment of grid-connected solar photovoltaic (PV) systems has increased, so too has the desire to track the installed cost of these systems over time and by location, customer type, system characteristics, and component. This report helps to fill this need by summarizing trends in the installed cost of grid-connected PV systems in the United States from 1998 through 2008 (updating a previous report with data through 2007). The analysis is based on installed cost data from more than 52,000 residential and non-residential PV systems, totaling 566 MW and representing 71% of all grid-connected PV capacity installed in the U.S. through 2008.

323

New and retrofit solar hot water installations in Florida, January--June 1977  

SciTech Connect

The purpose of this project was to ascertain the number of solar hot water installations in new buildings versus the number retrofitted to existing buildings in Florida during the January to June period of 1977. The methodology was to survey all installations started, in progress, or completed during that period. A by-product of the survey is a comprehensive list of manufacturers and another of distributors and installers in Florida. The survey excludes space heating and cooling and pool heating applications. However, the latter is being considered for a separate survey. Installations included are in the single-family and multi-family residential, commercial, industrial and public sectors. In the single-family residential sector, care has been taken to determine a new or retrofit breakdown, average square footage of collector per installation, average cost per square foot of collector in Florida, and subsequently, using F-CHART and system sizing programs developed at the Center, the fraction of load supplied by solar and its equivalent barrels of oil saved per year. In the multi-family residential, commercial, industrial and public sectors, specific information on each installation has been provided. This information includes new or retrofit, ownership, type of collector and manufacturer, square footage of installation, design percentage energy by solar, suxiliary fuel, system cost, and federal grants, if any.

1978-04-01T23:59:59.000Z

324

Drinking Water Problems: Copper  

E-Print Network (OSTI)

High levels of copper in drinking water can cause health problems. This publication explains the effects of copper in water and methods of removing it. 4 pp.

Dozier, Monty; McFarland, Mark L.; Lesikar, Bruce J.

2006-01-25T23:59:59.000Z

325

Solar heating and cooling system installed at Columbus, Ohio. Final report  

DOE Green Energy (OSTI)

The Solar Energy System installed at Columbus Technical Institute, Columbus, Ohio was installed as a part of a new construction of a college building. The building will house classrooms and laboratories, administrative offices and three lecture halls. The Solar Energy System consists of 4096 square feet (128 panels) Owens/Illinois Evacuated Glass Tube Collector Subsystem, and a 5000 gallon steel tank below ground storage system, hot water is circulated between the collectors and storage tank, passing through a water/lithium bromide absorption chiller to cool the building. Extracts from the site files specification references, drawings, installation, operation and maintenance instructions are included.

Coy, R.G.; Braden, R.P.

1980-09-01T23:59:59.000Z

326

ITOUGH2 sample problems  

DOE Green Energy (OSTI)

This report contains a collection of ITOUGH2 sample problems. It complements the ITOUGH2 User`s Guide [Finsterle, 1997a], and the ITOUGH2 Command Reference [Finsterle, 1997b]. ITOUGH2 is a program for parameter estimation, sensitivity analysis, and uncertainty propagation analysis. It is based on the TOUGH2 simulator for non-isothermal multiphase flow in fractured and porous media [Preuss, 1987, 1991a]. The report ITOUGH2 User`s Guide [Finsterle, 1997a] describes the inverse modeling framework and provides the theoretical background. The report ITOUGH2 Command Reference [Finsterle, 1997b] contains the syntax of all ITOUGH2 commands. This report describes a variety of sample problems solved by ITOUGH2. Table 1.1 contains a short description of the seven sample problems discussed in this report. The TOUGH2 equation-of-state (EOS) module that needs to be linked to ITOUGH2 is also indicated. Each sample problem focuses on a few selected issues shown in Table 1.2. ITOUGH2 input features and the usage of program options are described. Furthermore, interpretations of selected inverse modeling results are given. Problem 1 is a multipart tutorial, describing basic ITOUGH2 input files for the main ITOUGH2 application modes; no interpretation of results is given. Problem 2 focuses on non-uniqueness, residual analysis, and correlation structure. Problem 3 illustrates a variety of parameter and observation types, and describes parameter selection strategies. Problem 4 compares the performance of minimization algorithms and discusses model identification. Problem 5 explains how to set up a combined inversion of steady-state and transient data. Problem 6 provides a detailed residual and error analysis. Finally, Problem 7 illustrates how the estimation of model-related parameters may help compensate for errors in that model.

Finsterle, S.

1997-11-01T23:59:59.000Z

327

Preplanning can eliminate most historical SF/sub 6/ problems  

SciTech Connect

Non-alignment, seal leak, and interface design problems can mostly be eliminated through pre-planning for the purchase and installation of SF/sub 6/ switchgear. Studies by the Potomac Electric Power Company (PEPCO) show SF/sub 6/ gas-insulated to be superior to air-insulated equipment because of lower land and closure costs. Smaller land requirements also facilitate substation siting. PEPCO's pre-planning efforts for one substation are reviewed to illustrate how problems can be avoided during the final stages.

1979-07-01T23:59:59.000Z

328

California Solar Initiative (CSI) Thermal Program Metering Installation Guide Purpose: The purpose of this metering installation guide is to provide participating eligible contractors  

E-Print Network (OSTI)

1 California Solar Initiative (CSI) Thermal Program Metering Installation Guide Purpose to the mixing valve. Place the hot sensor on the pipe between the solar tank and the backup water heater. #12 to backup heater and a mixing valve between the solar tank and the backup water heater. Place the flow meter

329

Y-12 to Install New Fence to Reduce Trespassing | National Nuclear Security  

National Nuclear Security Administration (NNSA)

to Install New Fence to Reduce Trespassing | National Nuclear Security to Install New Fence to Reduce Trespassing | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Field Offices > Welcome to the NNSA Production Office > NPO Press Releases > Y-12 to Install New Fence to Reduce Trespassing Y-12 to Install New Fence to Reduce Trespassing March 28, 2013

330

Largest Solar Panel Installation at a U.S. University Goes Live |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Largest Solar Panel Installation at a U.S. University Goes Live Largest Solar Panel Installation at a U.S. University Goes Live Largest Solar Panel Installation at a U.S. University Goes Live November 4, 2010 - 6:10pm Addthis Sen. Menendez, Rep. Pascrell, John Lushetsky and other officials at the ribbon cutting. Sen. Menendez, Rep. Pascrell, John Lushetsky and other officials at the ribbon cutting. John Lushetsky A couple of weeks ago, I had the opportunity to participate in a ribbon cutting event for the largest solar installation on a United States university campus. It was an honor to stand with Senator Robert Menendez, Representative Bill Pascrell, university administrators, faculty and students to celebrate William Paterson University's new solar panels. This project will have the capacity to produce 3.5 megawatts of clean

331

Consider Installing High-Pressure Boilers with Backpressure Turbine-Generators  

SciTech Connect

This revised ITP tip sheet on installing high-pressure boilers provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

2006-01-01T23:59:59.000Z

332

Data Safer than Ever with FM-200 Installation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Data Safer than Ever with FM-200 Installation Data Safer than Ever with FM-200 Installation Data Safer than Ever with FM-200 Installation October 22, 2013 - 6:04pm Addthis What does this project do? Goal 2. Preserve, protect, and share records and information The consolidated data center at the Legacy Management Business Center (LMBC) in Morgantown, West Virginia, is now guarded by a state-of-the-art FM-200® Fire Suppression System. Installation of the new system began on June 11, 2013, and the system became operational on July 18. FM-200® Fire Suppression System The "Clean Agent" system offers several advantages over traditional fire suppression. FM-200 is a clean, colorless, and environmentally friendly fire suppressant that is electronically non-conductive and safe for humans. The fire suppression system extinguishes flames primarily

333

NREL: Technology Deployment - NREL Helps U.S. Virgin Islands Install Wind  

NLE Websites -- All DOE Office Websites (Extended Search)

NREL Helps U.S. Virgin Islands Install Wind Testing Equipment NREL Helps U.S. Virgin Islands Install Wind Testing Equipment Photo of wind turbines being erected. NREL's analysis and technical expertise is helping the U.S. Virgin Islands find ways to reduce fossil fuel use by 60% through the development of utility-scale wind opportunities. January 10, 2013 With the help of NREL, the U.S. Virgin Islands (USVI) recently marked a major milestone on the way toward its goal of a 60% reduction in fossil fuel use by 2025. In December, NREL experts assisted with the installation of wind anemometer towers and sonic detection and ranging (SODAR) equipment on the islands of St. Thomas and St. Croix to collect data that will be used for the development of a utility-scale wind project in the territory. The installation represents how the USVI is moving forward with NREL's

334

Data Safer than Ever with FM-200 Installation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Data Safer than Ever with FM-200 Installation Data Safer than Ever with FM-200 Installation Data Safer than Ever with FM-200 Installation October 22, 2013 - 6:04pm Addthis What does this project do? Goal 2. Preserve, protect, and share records and information The consolidated data center at the Legacy Management Business Center (LMBC) in Morgantown, West Virginia, is now guarded by a state-of-the-art FM-200® Fire Suppression System. Installation of the new system began on June 11, 2013, and the system became operational on July 18. FM-200® Fire Suppression System The "Clean Agent" system offers several advantages over traditional fire suppression. FM-200 is a clean, colorless, and environmentally friendly fire suppressant that is electronically non-conductive and safe for humans. The fire suppression system extinguishes flames primarily

335

New Jersey SmartStart Buildings - Direct Install Program | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New Jersey SmartStart Buildings - Direct Install Program New Jersey SmartStart Buildings - Direct Install Program New Jersey SmartStart Buildings - Direct Install Program < Back Eligibility Commercial Industrial Local Government Nonprofit Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Other Construction Appliances & Electronics Commercial Lighting Lighting Manufacturing Maximum Rebate Lesser of 70% of project costs or $75,000 per project; annual entity cap of $250,000 Program Info Funding Source New Jersey Societal Benefits Charge (public benefits fund); ARRA State New Jersey Program Type State Rebate Program Rebate Amount Varies Provider c/o TRC Energy Services The Direct Install program offers turn-key energy efficiency solutions to qualified industrial and commercial customers that, with some exceptions,

336

Energy Department Launches SunShot Prize Competition to Install Solar  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SunShot Prize Competition to Install SunShot Prize Competition to Install Solar Energy Systems at a Fraction of Today's Price Energy Department Launches SunShot Prize Competition to Install Solar Energy Systems at a Fraction of Today's Price September 12, 2012 - 2:27pm Addthis News Media Contact (202) 586-4940 WASHINGTON - As part of the Energy Department's SunShot Initiative, which is working to make solar energy competitive with other forms of energy without subsidy by the end of the decade, the Energy Department today announced the start of a new competition to make it faster, easier, and cheaper to install rooftop solar energy systems. The SunShot Prize makes a total of $10 million in cash awards available to the first three teams that repeatedly demonstrate the non-hardware costs, or price to plug

337

The social construction and visualisation of a new Norwegian offshore installation  

Science Conference Proceedings (OSTI)

This paper exemplifies how to make aggregated descriptions or requirements of work processes to serve as references or resources for future situated actions in the operations of a new oil installation. It describes a joint organisational and IT-development ...

Vidar Heps

1997-09-01T23:59:59.000Z

338

New Berkeley Lab Report Tracks a Decade of PV Installed Cost Trends  

E-Print Network (OSTI)

upward pressure on PV module prices. As discussed below,and utility PV programs. Unlike module prices, which arePV installations may benefit from economies of scale, through price

Barbose, Galen

2009-01-01T23:59:59.000Z

339

Strategy for Developing 10-Year Energy Management Plans at U.S. Army Forces Command Installations.  

SciTech Connect

In order to reach the energy reduction and sustainability goals of the Executive Order 13123, and to minimize overall energy and water costs, the U.S Army Forces Command (FORSCOM), with assistance of PNNL, has embarked on a program to develop comprehensive 10-year Energy Management Plans for each of the 11 major FORSCOM installations. These plans will identify activities and projects critical to the installation's reaching the Executive Order (E.O.) goals as well as help ensure a reliable and secure energy supply. Each FORSCOM installation will be responsible for developing a plan that is closely linked with the installation Master Plan. The Energy Management Plan will cover elements on both the demand side and the supply side, as well as energy/water security assessments and funding/financing resource requirements.

Parker, Graham B. (BATTELLE (PACIFIC NW LAB)); Gillespie, Adrian (U.S. Army Forces Command); Dixon, Douglas R. (BATTELLE (PACIFIC NW LAB)); Brown, Daryl R. (BATTELLE (PACIFIC NW LAB)); Reilly, Raymond W. (BATTELLE (PACIFIC NW LAB)); Warwick, William M. (BATTELLE (PACIFIC NW LAB))

2002-10-01T23:59:59.000Z

340

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 006 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3  

E-Print Network (OSTI)

that Value . . . . . . . . . . . . . . . . . . . . . . . . . .13 Project Performance and Capital Costs Drive Wind Power Prices . . . . .14 Installed Project Costs Are On the Rise, After a Long Period of Decline. .15 Project Cost Increases Are a Function of Turbine Prices . . . . . . . . . . . .16 Wind Project

Note: This page contains sample records for the topic "installation problems bullet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

ConEd (Gas and Electric) - Small Business Direct Install Program...  

Open Energy Info (EERE)

ConEd (Gas and Electric) - Small Business Direct Install Program (New York) No revision has been approved for this page. It is currently under review by our subject matter experts....

342

Net Zero Energy Military Installations: A Guide to Assessment and Planning  

Science Conference Proceedings (OSTI)

The U.S. Department of Defense (DoD) recognizes the strategic importance of energy to its mission, and is working to reduce energy consumption and enhance energy self-sufficiency by drawing on local clean energy sources. A joint initiative formed between DoD and the U.S. Department of Energy (DOE) in 2008 to address military energy use led to a task force to examine the potential for net zero energy military installations, which would produce as much energy on site as they consume in buildings, facilities, and fleet vehicles. This report presents an assessment and planning process to examine military installations for net zero energy potential. Net Zero Energy Installation Assessment (NZEIA) presents a systematic framework to analyze energy projects at installations while balancing other site priorities such as mission, cost, and security.

Booth, S.; Barnett, J.; Burman, K.; Hambrick, J.; Westby, R.

2010-08-01T23:59:59.000Z

343

Net Zero Energy Military Installations: A Guide to Assessment and Planning  

Energy.gov (U.S. Department of Energy (DOE))

In 2008, DoD and DOE defined a joint initiative to address military energy use by identifying specific actions to reduce energy demand and increase use of renewable energy on DoD installations.

344

Tests to determine effect of humidity on high-efficiency filters when installed horizontally  

SciTech Connect

The object of tests is to determine effect of high-humidity air on the physical characteristics of filter media and separators when the filter is mounted in the horizontal position. Usual installation is with the filter mounted vertically.

Palmer, J.H.

1960-10-04T23:59:59.000Z

345

Tracking the Sun V An Historical Summary of the Installed Price...  

NLE Websites -- All DOE Office Websites (Extended Search)

Tracking the Sun V An Historical Summary of the Installed Price of Photovoltaics in the United States from 1998 to 2011 Title Tracking the Sun V An Historical Summary of the...

346

TY RPRT T1 Tracking the Sun VI An Historical Summary of the Installed...  

NLE Websites -- All DOE Office Websites (Extended Search)

Tracking the Sun VI An Historical Summary of the Installed Price of Photovoltaics in the United States from to A1 Galen L Barbose A1 Na m Darghouth A1 Samantha Weaver A1 Ryan H...

347

205 kW Photovoltaic (PV) System Installed on the U.S. Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

in partnership with the General Services Administration (GSA), has installed a rooftop solar electric, or PV, system on the roof of DOE's headquarters in Washington, D.C. The...

348

The Installed Price of Solar Photovoltaic Systems in the U.S...  

NLE Websites -- All DOE Office Websites (Extended Search)

to Decline at a Rapid Pace Tracking the Sun VI August 2013 The installed price of solar photovoltaic (PV) power systems in the United States fell substantially in 2012 and...

349

PV Installation Labor Market Analysis and PV JEDI Tool Developments (Presentation)  

DOE Green Energy (OSTI)

The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

Friedman, B.

2012-06-01T23:59:59.000Z

350

Building-Integrated Photovoltaics (BIPV) in the Residential Section: An Analysis of Installed Rooftop Prices (Presentation)  

DOE Green Energy (OSTI)

This powerpoint presentation to be presented at the World Renewable Energy Forum on May 17, 2012, in Denver, CO, discusses building-integrated photovoltaics (BIPV) in the residential section and includes an analysis of installed rooftop prices.

James, T.; Goodrich, A.; Woodhouse, M.; Margolis, R.; Ong, S.

2012-06-01T23:59:59.000Z

351

Tracking the Sun VI: An Historical Summary of the Installed Price...  

NLE Websites -- All DOE Office Websites (Extended Search)

Tracking the Sun VI: An Historical Summary of the Installed Price of Photovoltaics in the United States from 1998 to 2012 Title Tracking the Sun VI: An Historical Summary of the...

352

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

E-Print Network (OSTI)

Annual Report on U.S. Wind Power Installation, Cost, and3 U.S. Wind Power Capacity Increased by 27% inAre Significant. . . . . . . 9 Wind Power Prices Are Up in

2008-01-01T23:59:59.000Z

353

BUILDOUT AND UPGRADE OF CENTRAL EMERGENCY GENERATOR SYSTEM, GENERATOR 3 AND 4 ELECTRICAL INSTALLATION  

Science Conference Proceedings (OSTI)

SECTION 01000SUMMARY OF WORK PART 1GENERAL 1.1 SUMMARY The work to be performed under this project consists of providing the labor, equipment, and materials to perform "Buildout and Upgrade of Central Emergency Generator System, Generator 3 and 4 Electrical Installation" for the National Aeronautics and Space Administration at the Dryden Flight Research Center (NASA/DFRC), Edwards, California 93523. All modifications to existing substations and electrical distribution systems are the responsibility of the contractor. It is the contractors responsibility to supply a complete and functionally operational system. The work shall be performed in accordance with these specifications and the related drawings. The work of this project is defined by the plans and specifications contained and referenced herein. This work specifically includes but is not limited to the following: Scope of Work - Installation 1. Install all electrical wiring and controls for new generators 3 and 4 to match existing electrical installation for generators 1 and 2 and in accordance with drawings. Contractor shall provide as-built details for electrical installation. 2. Install battery charger systems for new generators 3 and 4 to match existing battery charging equipment and installation for generators 1 and 2. This may require exchange of some battery charger parts already on-hand. Supply power to new battery chargers from panel and breakers as shown on drawings. Utilize existing conduits already routed to generators 3 and 4 to field route the new wiring in the most reasonable way possible. 3. Install electrical wiring for fuel/lube systems for new generators 3 and 4 to match existing installation for generators 1 and 2. Supply power to lube oil heaters and fuel system (day tanks) from panel and breakers as shown on drawings. Utilize existing conduits already routed to generators 3 and 4 to field route the new wiring in the most reasonable way possible. Add any conduits necessary to complete wiring to fuel systems. 4. Install power to new dampers/louvers from panel and breakers as shown on drawings. Wiring shall be similar to installation to existing dampers/louvers. Utilize existing conduits already routed to louver areas to field route the new wiring in the most reasonable way possible. Add any conduits necessary to complete wiring to new dampers/louvers. 5. Install power to jacket water heaters for new generators 3 and 4 from panel and breakers as shown on drawings. Utilize existing conduits already routed to generators 3 and 4 to field route the new wiring in the most reasonable way possible. 6. Install new neutral grounding resistor and associated parts and wiring for new generators 3 and 4 to match existing installation for generators 1 and 2. Grounding resistors will be Government Furnished Equipment (GFE). 7. Install two new switchgear sections, one for generator #3 and one for generator #4, to match existing generator #1 cubicle design and installation and in accordance with drawings and existing parts lists. This switchgear will be provided as GFE. 8. Ground all new switchgear, generators 3 and 4, and any other new equipment to match existing grounding connections for generators 1 and 2, switchgear and other equipment. See drawings for additional details. Grounding grid is already existing. Ensure that all grounding meets National Electrical Code requirements. 9. Cummins DMC control for the generator and switchgear syste

Gary D. Seifert; G. Shawn West; Kurt S. Myers; Jim Moncur

2006-07-01T23:59:59.000Z

354

Methods to Improve Quality in Installation of Transmission Cable Accessories -- 2012 Interim Results  

Science Conference Proceedings (OSTI)

Cable accessories are critical components of underground transmission cable systems. This report summarizes types of transmission class joints and terminations and discusses root causes of accessory failures. The failures can be a result of many phases, from accessory design, application, installation, and operation to end of life. Appropriate design, application, installation, qualification, inspection, maintenance, and operation of cable accessories are of considerable importance for a reliable ...

2012-11-16T23:59:59.000Z

355

Installation Of Service Connections For Sensors Or Transmitters In Buried Water Pipes  

DOE Patents (OSTI)

A system for installing warning units in a buried pipeline. A small hole is drilled in the ground to the pipeline. A collar is affixed to one of the pipes of the pipeline. A valve with an internal passage is connected to the collar. A hole is drilled in the pipe. A warning unit is installed in the pipe by moving the warning unit through the internal passage, the collar, and the hole in the pipe.

Burnham, Alan K. (Livermore, CA); Cooper, John F. (Oakland, CA)

2006-02-21T23:59:59.000Z

356

Fire safety for your wood-burning appliance: tips for proper installation, operation, and maintenance  

Science Conference Proceedings (OSTI)

A dramatic increase in house fires caused by wood-burning appliances has accompanied the rediscovery of wood as an alternative heating fuel. The National Bureau of Standards attributed the majority of these fires to conditions related to the installation, operation or maintenance of the appliances rather than malfunctions or construction defects. This publication presents guidelines for the proper installation, use, and maintenance of wood-burning appliances in the home. (DMC)

Not Available

1984-01-01T23:59:59.000Z

357

Mechanical Effects on Extruded Dielectric Cables and Joints Installed in Underground Transmission Systems in North America  

Science Conference Proceedings (OSTI)

In other parts of the world, cable is directly buried or installed in tunnels; but underground cable systems in North America have traditionally been installed in duct/manhole systems or in pipes. In these settings, cables expand and contract during load cycling; and the resulting mechanical stresses can have an impact on the reliable performance of the cable system. With the increased use of extruded dielectric transmission cable systems, EPRI member utilities are faced with the challenge of evaluating ...

2004-04-08T23:59:59.000Z

358

Facility Energy Decision System (FEDS) Assessment Report for US Army Garrison, Japan - Honshu Installations  

Science Conference Proceedings (OSTI)

This report documents an assessment was performed by a team of engineers from Pacific Northwest National Laboratory (PNNL) under contract to the Installation Management Command (IMCOM) Pacific Region Office (PARO). The effort used the Facility Energy Decision System (FEDS) model to determine how energy is consumed at five U.S. Army Garrison-Japan (USAG-J) installations in the Honshu area, identify the most cost-effective energy retrofit measures, and calculate the potential energy and cost savings.

Kora, Angela R.; Brown, Daryl R.; Dixon, Douglas R.

2010-03-09T23:59:59.000Z

359

Lara Aniskoff 12/15/2010 Installing QGIS 1.6.0 in Windows  

E-Print Network (OSTI)

Lara Aniskoff 12/15/2010 Installing QGIS 1.6.0 in Windows System Requirements- 1. Windows XP://www.qgis.org/wiki/Download and click on the Standalone Installer for Windows Step 2: Click on Download QGIS 1.6.0. You will be asked to save a .exe file. On most Windows machines, this will go to your "Downloads" folder. #12;Lara Aniskoff

Schweik, Charles M.

360

Installation package for a domestic solar heating and hot water system  

DOE Green Energy (OSTI)

Fern Engineering Company, Inc. has developed two prototype solar heating and hot water systems. The systems have been installed at Tunkhannock, Pennsylvania, and Lansing, Michigan. The system consists of the following subsystems: solar collector, storage, control, transport, and auxiliary energy. General guidelines which may be utilized in development of detailed installation plans and specifications are presented. In addition, instruction on operation, maintenance, and repair of a solar heating and hot water system is provided.

Not Available

1978-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "installation problems bullet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Certification for Small Wind Turbine Installers: What's the Hang Up?; Preprint  

SciTech Connect

Several programs have been implemented to support the advancement of a professional, mature small wind industry and to ensure that this industry moves forward in a sustainable direction. The development of a standard for small wind turbine systems and the creation of the Small Wind Certification Council support small wind technology that is reliable and safe. Consumers and incentive programs will ultimately rely on certification to differentiate among systems sold in the U.S. market. Certification of small wind installers is yet another component deemed necessary for this industry to expand. The National Renewable Energy Laboratory, under the guidance and funding support of the U.S. Department of Energy, supported the development of small wind system installer certification provided via the North American Board of Certified Energy Practitioners. However, the small wind community is not supportive of the installer certification. There are currently only nine certified installers in the U.S. pool. This paper provides an overview of the installer certification program and why more small wind turbine installers are not pursuing this certification.

Oteri, F.; Sinclair, K.

2012-03-01T23:59:59.000Z

362

Certification for Small Wind Turbine Installers: What's the Hang Up?; Preprint  

DOE Green Energy (OSTI)

Several programs have been implemented to support the advancement of a professional, mature small wind industry and to ensure that this industry moves forward in a sustainable direction. The development of a standard for small wind turbine systems and the creation of the Small Wind Certification Council support small wind technology that is reliable and safe. Consumers and incentive programs will ultimately rely on certification to differentiate among systems sold in the U.S. market. Certification of small wind installers is yet another component deemed necessary for this industry to expand. The National Renewable Energy Laboratory, under the guidance and funding support of the U.S. Department of Energy, supported the development of small wind system installer certification provided via the North American Board of Certified Energy Practitioners. However, the small wind community is not supportive of the installer certification. There are currently only nine certified installers in the U.S. pool. This paper provides an overview of the installer certification program and why more small wind turbine installers are not pursuing this certification.

Oteri, F.; Sinclair, K.

2012-03-01T23:59:59.000Z

363

Proposal for the Award of a Contract for Maintenance, Operation and Minor Installation Work for CERN Cooling and HVAC Systems  

E-Print Network (OSTI)

Proposal for the Award of a Contract for Maintenance, Operation and Minor Installation Work for CERN Cooling and HVAC Systems

1996-01-01T23:59:59.000Z

364

Corrosion Problems and Solutions  

Science Conference Proceedings (OSTI)

Table 5   Typical deaerator corrosion problems...General corrosion of vessels and piping GC Layup, CH V, high iron in feedwater None N/A (a) CF, corrosion fatigue;

365

Swaging Problems and Solutions  

Science Conference Proceedings (OSTI)

Table 5   Some swaging problems, potential causes, and possible solutions...causes Solutions Difficult feeding Work material too hard Anneal or stress relieve to remove effects of cold

366

The Magnetotelluric Inverse Problem  

E-Print Network (OSTI)

15721592. Banks, R. , 1969: Geomagnetic variations and theThe inverse problem in geomagnetic induction. Z. Geophys. ,sound inferences from geomagnetic sounding, doi:10.1016/j.

Medin, Ashley E

2008-01-01T23:59:59.000Z

367

The magnetotelluric inverse problem  

E-Print Network (OSTI)

15721592. Banks, R. , 1969: Geomagnetic variations and theThe inverse problem in geomagnetic induction. Z. Geophys. ,sound inferences from geomagnetic sounding, doi:10.1016/j.

Medin, Ashley E.

2008-01-01T23:59:59.000Z

368

Hydrostatic Adjustment: Lamb's Problem  

Science Conference Proceedings (OSTI)

The prototype problem of hydrostatic adjustment for large-scale atmospheric motions is Presented. When a horizontally infinite layer of compressible fluid, initially at rest, is instantaneously heated, the fluid is no longer in hydrostatic ...

Peter R. Bannon

1995-05-01T23:59:59.000Z

369

Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008  

E-Print Network (OSTI)

2008 BACK PAGE Tracking the Sun II: The Installed Cost of10-100 kW >100 kW Tracking the Sun II: The Installed Cost ofSystems MW Total Tracking the Sun II: The Installed Cost of

Barbose, Galen L

2010-01-01T23:59:59.000Z

370

Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007  

E-Print Network (OSTI)

10-100 kW >100 kW Tracking the Sun: The Installed Cost ofout over five years. Tracking the Sun: The Installed Cost ofU.S. from 1998-2007 Tracking the Sun: The Installed Cost of

Wiser, Ryan

2009-01-01T23:59:59.000Z

371

Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007  

SciTech Connect

As installations of grid-connected solar photovoltaic (PV) systems have grown, so too has the desire to track the installed cost of these systems over time, by system characteristics, by system location, and by component. This report helps to fill this need by summarizing trends in the installed cost of grid-connected PV systems in the United States from 1998 through 2007. The report is based on an analysis of installed cost data from nearly 37,000 residential and non-residential PV systems, totaling 363 MW of capacity, and representing 76percent of all grid-connected PV capacity installed in the U.S. through 2007.

Wiser, Ryan; Barbose, Galen; Peterman, Carla

2009-02-11T23:59:59.000Z

372

Design basis and requirements for 241-SY modular exhauster mechanical installation  

SciTech Connect

A new ventilation system is being installed to serve as the K-1 primary exhauster. The existing K-1 primary exhauster will then become the backup. This ventilation system services waste tanks 241-SY-101, 102 and 103. The nominal flow rate through the ventilation system is 1,000 cfm. The new ventilation system will contain a moisture eliminator, a heater, a prefilter, two stages of HEPA filtration, an exhaust fan, a stack and stack sampling system. The purpose of this document is to serve as the design and functional requirements for the mechanical installation of the new 241-SY modular exhauster. The mechanical installation will include modifying the existing ductwork (i.e., installing a ``T`` to connect the new exhauster to the existing system), modifying the existing condensate drain lines to accommodate the new lines associated with the new exhauster, a maintenance platform near the stack of the new exhauster, guy wires and guy wire footings to support the stack of the new exhauster, as well as other miscellaneous tasks associated with the mechanical installation design effort.

Kriskovich, J.R.

1994-11-10T23:59:59.000Z

373

Fiscal year 1995 well installation program summary Y-12 Plant, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

This report summarizes the well installation activities conducted during the federal fiscal year (FY) 1995 drilling program at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (including activities that were performed in late FY 1994, but not included in the FY 1994 Well Installation Program Summary Report). Synopses of monitoring well construction/well development data, well location rationale, geological/hydrological observations, quality assurance/quality control methods, and health and safety monitoring are included. Three groundwater monitoring wells and two gas monitoring probes were installed during the FY 1995 drilling program. One of the groundwater monitoring wells was installed at Landfill VI, the other two in the Boneyard/Burnyard area. All of the groundwater monitoring wells were constructed with stainless steel screens and casings. The two gas monitoring probes were installed at the Centralized Sanitary Landfill II and were of polyvinyl chloride (PVC) screened construction. Eleven well rehabilitation/redevelopment efforts were undertaken during FY 1995 at the Y-12 Plant. All new monitoring wells and wells targeted for redevelopment were developed by either a 2.0-in. diameter swab rig or by hand bailing until nonspecific parameters (pH and specific conductance) attained steady-state levels. Turbidity levels were lowered, if required, to the extent practicable by continued development beyond a steady-state level of pH and conductance.

NONE

1995-09-01T23:59:59.000Z

374

The Sedov Test Problem  

SciTech Connect

The Sedov test is classically defined as a point blast problem. The Sedov problem has led us to advances in algorithms and in their understanding. Vorticity generation can be physical or numerical. Both play a role in Sedov calculations. The RAGE code (Eulerian) resolves the shock well, but produces vorticity. The source definition matters. For the FLAG code (Lagrange), CCH is superior to SGH by avoiding spurious vorticity generation. FLAG SGH currently has a number of options that improve results over traditional settings. Vorticity production, not shock capture, has driven the Sedov work. We are pursuing treatments with respect to the hydro discretization as well as to artificial viscosity.

Fung, Jimmy [Los Alamos National Laboratory; Masser, Thomas [Los Alamos National Laboratory; Morgan, Nathaniel R. [Los Alamos National Laboratory

2012-06-25T23:59:59.000Z

375

Dropsketch installation  

Science Conference Proceedings (OSTI)

Dropsketch is a Smartphone drawing system that enables users to anonymously create and share simple black and white sketches of their surroundings. The free app, available for iPhone and Android devices, contains an easy-to-use sketching tool ... Keywords: digital arts, interaction, sketching

Sean Clark

2013-06-01T23:59:59.000Z

376

Five Million Smart Meters Installed Nationwide is Just the Beginning of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Five Million Smart Meters Installed Nationwide is Just the Five Million Smart Meters Installed Nationwide is Just the Beginning of Smart Grid Progress Five Million Smart Meters Installed Nationwide is Just the Beginning of Smart Grid Progress June 13, 2011 - 1:55pm Addthis A 21st Century Grid includes increasing the overall efficiency of our generating, transmission and distribution system to facilitate the growth of renewable energy sources. | Energy Department Image A 21st Century Grid includes increasing the overall efficiency of our generating, transmission and distribution system to facilitate the growth of renewable energy sources. | Energy Department Image Secretary Chu Secretary Chu Former Secretary of Energy What does this mean for me? We must have an efficient electricity infrastructure to compete in the global economy.

377

Making the Connection: Beneficial Collaboration Between Army Installations and Energy Utility Companies  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

"Making the Connection: "Making the Connection: Beneficial Collaboration Between Army Installations and Energy Utility Companies" Beth Lachman RAND Corporation Federal Utility Partnership Working Group (FUPWG) Fall 2011, Philadelphia, PA October 26, 2011 Contact Information: Beth Lachman, Phone: 703-413-1100, ext. 5279, E-mail: BETHL@RAND.ORG Motivation for RAND Study * Energy Independence and Security Act of 2007, Energy Policy Act of 2005, and Executive Order 13423 require military installations to - Reduce energy use 30% by 2015 - Increase renewable energy use 7.5% or more by 2013 * Army installations spend significant amounts on energy utilities - Over $1.2 billion spent in 2010 - Energy prices are rising * Collaboration with utility companies, such as with Utility Energy Service Contracts (UESCs), offers

378

ConEd (Gas and Electric) - Small Business Direct Install Program (New York)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ConEd (Gas and Electric) - Small Business Direct Install Program ConEd (Gas and Electric) - Small Business Direct Install Program (New York) ConEd (Gas and Electric) - Small Business Direct Install Program (New York) < Back Eligibility Commercial Savings Category Other Appliances & Electronics Commercial Lighting Lighting Heating & Cooling Commercial Heating & Cooling Program Info State New York Program Type Utility Rebate Program Rebate Amount Energy Survey: Free Programmable Thermostat: Free Equipment Upgrades Identified in Energy Survey: Con Edison will pay up to 70% of the remaining cost directly to the contractor ConEd is providing free energy surveys to its small business customers. The survey will take 30 to 90 minutes and efficiency opportunities and associated costs will be presented on the spot. If the customer agrees to

379

Reviewing Post-Installation and Annual Reports for Federal ESPC Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reviewing Post-Installation and Annual Reports Reviewing Post-Installation and Annual Reports For Federal ESPC Projects February 2007 Federal Energy Management Program (FEMP) Office of Energy Efficiency and Renewable Energy U.S. Department of Energy This document was developed for the U.S. Department of Energy's Federal Energy Management Program by Nexant, Inc., and Lawrence Berkeley National Laboratory. This document is posted on FEMP's Web site at www.eere.energy.gov/femp/financing/superespcs_mvresources.html. Contents Reviewing Post-Installation and Annual Reports for Federal ESPC Projects 1 Step 1 - Prepare Custom Report and Checklists from Template 1 Step 2 - Review Project Documentation 2 Step 3 - Complete Checklists 2 Step 4 - Finalize Report 3 Step 5 - Provide Written Review to Agency and DOE 3

380

Small Wind Guidebook/Where Can I Find Installation and Maintenance Support  

Open Energy Info (EERE)

Where Can I Find Installation and Maintenance Support Where Can I Find Installation and Maintenance Support < Small Wind Guidebook Jump to: navigation, search Print PDF WIND ENERGY STAKEHOLDER ENGAGEMENT & OUTREACHSmall Wind Guidebook Home WindTurbine-icon.png Small Wind Guidebook * Introduction * First, How Can I Make My Home More Energy Efficient? * Is Wind Energy Practical for Me? * What Size Wind Turbine Do I Need? * What Are the Basic Parts of a Small Wind Electric System? * What Do Wind Systems Cost? * Where Can I Find Installation and Maintenance Support? * How Much Energy Will My System Generate? * Is There Enough Wind on My Site? * How Do I Choose the Best Site for My Wind Turbine? * Can I Connect My System to the Utility Grid? * Can I Go Off-Grid? * State Information Portal * Glossary of Terms * For More Information

Note: This page contains sample records for the topic "installation problems bullet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

NETL: News Release - 99.99% Clean...DOE Signs Agreement to Install Advanced  

NLE Websites -- All DOE Office Websites (Extended Search)

99.99% Clean...DOE Signs Agreement to Install Advanced Pollution Control Device on S. Dakota Power Plant 99.99% Clean...DOE Signs Agreement to Install Advanced Pollution Control Device on S. Dakota Power Plant Leading-Edge System Virtually Eliminates Emissions of Microscopic Ash Particles - Otter Tail's Big Stone Power Plant - South Dakota's Big Stone Plant will soon get an environmental upgrade that will virtually eliminate particulate emissions. Photo: Otter Tail Power Co. MILBANK, SD - By this fall South Dakota will likely host one of the world's cleanest coal plants in terms of the tiny specks of fly ash emitted from its smokestack. A cooperative agreement signed between the U.S. Department of Energy and the Otter Tail Power Company paves the way for installation of a new type of pollution control device on the 450-megawatt Big Stone Power Plant in Milbank, South Dakota.

382

SITEWIDE CATEGORICAL EXCLUSION FOR SAFETY AND SECURITY COMPONENT INSTALLATION AND ALTERATION, PACIFIC NORTHWEST  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 SITEWIDE CATEGORICAL EXCLUSION FOR SAFETY AND SECURITY COMPONENT INSTALLATION AND ALTERATION, PACIFIC NORTHWEST NATIONAL LABORATORY, RICHLAND, WASHINGTON Proposed Action: The u.s. Department ofBnergy (DOE) Pacific Northwest Site Office (PNSO) proposes to install. alter, and/or maintain safety and security components to maintain an adequate protective planning stance. Loeation of Action: The proposed action would occur on the Pacific Northwest National Laboratory (PNNL) Site and in the vicinity ofPNNL facilities in the State of Washington. DacriptioD of the Proposed Action: DOE proposes to install, alter, and/or maintain safety and security systems to continue to provide appropriate levels of protection against unauthorized access, theft, diversion, loss

383

CATEGORICAL EXCLUSION TO INSTALL EMSL SUPER-COMPUTER POWER INFRASTRUCTURE, PACIFIC NORTHWEST NATIONAL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TO INSTALL EMSL SUPER-COMPUTER TO INSTALL EMSL SUPER-COMPUTER POWER INFRASTRUCTURE, PACIFIC NORTHWEST NATIONAL LABORATORY, RICHLAND, WASHINGTON Proposed Action: The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) proposes to provide enhanced electrical service to the Environmental Molecular Sciences Laboratory (EMSL) to provide an increased power capacity for future facility computational developments. Location of Action: The electrical service would be installed underground via excavation in the lawn and gravel area between EMSL, room 1145, west toward the northeast comer of the Biological Sciences Facility (BSF), in Richland, Washington. The excavation would also extend north-south for about 450 feet along the property line between EMSL and BSF. Please refer to Figure 1.

384

SC: Install units produced by the high performance RTU challenge | The  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Solutions Teams » Space Conditioning » Install units Technology Solutions Teams » Space Conditioning » Install units produced by the High Performance Rooftop Unit Challenge that meet the high performance rooftop unit specification Activities Technology Solutions Teams Lighting & Electrical Space Conditioning Plug & Process Loads Food Service Refrigeration Laboratories Energy Management & Information Systems Public Sector Teams Market Solutions Teams Install units produced by the High Performance Rooftop Unit Challenge that meet the high performance rooftop unit specification In January 2011, the U.S. Department of Energy (DOE) joined industry partners in the Better Buildings Alliance to release a design specification for 10-ton capacity commercial air conditioners, also known as rooftop units (RTUs).

385

Five Million Smart Meters Installed Nationwide is Just the Beginning of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Five Million Smart Meters Installed Nationwide is Just the Five Million Smart Meters Installed Nationwide is Just the Beginning of Smart Grid Progress Five Million Smart Meters Installed Nationwide is Just the Beginning of Smart Grid Progress June 13, 2011 - 1:55pm Addthis A 21st Century Grid includes increasing the overall efficiency of our generating, transmission and distribution system to facilitate the growth of renewable energy sources. | Energy Department Image A 21st Century Grid includes increasing the overall efficiency of our generating, transmission and distribution system to facilitate the growth of renewable energy sources. | Energy Department Image Secretary Chu Secretary Chu Former Secretary of Energy What does this mean for me? We must have an efficient electricity infrastructure to compete in the global economy.

386

Maximizing the Value of Photovoltaic Installations on Schools in California: Choosing the Best Electricity Rates  

DOE Green Energy (OSTI)

Schools in California often have a choice between multiple electricity rate options. For schools with photovoltaic (PV) installations, choosing the right rate is essential to maximize the value of PV generation. The rate option that minimizes a school?s electricity expenses often does not remain the most economical choice after the school installs a PV system. The complex interaction between PV generation, building load, and rate structure makes determining the best rate a challenging task. This report evaluates 22 rate structures across three of California?s largest electric utilities--Pacific Gas and Electric Co. (PG&E), Southern California Edison (SCE), and San Diego Gas and Electric (SDG&E)--in order to identify common rate structure attributes that are favorable to PV installations.

Ong, S.; Denholm, P.

2011-07-01T23:59:59.000Z

387

Impact evaluation of energy conservation measures installed at a new industrial facility  

SciTech Connect

This paper presents the pros and cons of several energy, savings estimating methods considered as part of a recent impact evaluation of energy conservation measures installed at a lumber mill in the Pacific Northwest. The energy conservation measures (adjustable speed drives, programmable logic controllers, and high efficiency motors) were installed when the mill was initially constructed rather than being installed as a retrofit. Therefore, direct measurement of baseline energy consumption was impossible. As described in this paper, several reasonable methods can be formulated for estimating the energy savings when a physical baseline does not exist. The alternative methods will often result in radically different energy savings estimates, which may translate into significantly different conclusions regarding the efficacy of the energy conservation measures and/or the energy conservation program being evaluated. Therefore, it is critical to understand and carefully consider the options for estimating energy savings when a physical baseline does not exist.

Brown, D.R.; Spanner, G.E. [Pacific Northwest Lab., Richland, WA (United States); Riewer, S. [USDOE Bonneville Power Administration, Portland, OR (United States)

1995-08-01T23:59:59.000Z

388

Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility  

Science Conference Proceedings (OSTI)

Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project cost match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.

Jack Q. Richardson

2012-06-28T23:59:59.000Z

389

Solving quantified constraint satisfaction problems  

Science Conference Proceedings (OSTI)

We make a number of contributions to the study of the Quantified Constraint Satisfaction Problem (QCSP). The QCSP is an extension of the constraint satisfaction problem that can be used to model combinatorial problems containing contingency or uncertainty. ... Keywords: Arc consistency, Quantified Boolean formulas, Quantified constraint satisfaction problems, Random problems, Search algorithms

Ian P. Gent; Peter Nightingale; Andrew Rowley; Kostas Stergiou

2008-04-01T23:59:59.000Z

390

Tracking the Sun IV: An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010  

E-Print Network (OSTI)

in 2007-2010. Tracking the Sun IV: The Installed Cost of$/W) Total Tracking the Sun IV: The Installed Cost of$/W) Total Tracking the Sun IV: The Installed Cost of

Darghouth, Naim

2012-01-01T23:59:59.000Z

391

Drinking Water Problems: Radionuclides  

E-Print Network (OSTI)

Radionuclides in drinking water can cause serious health problems for people. This publication explains what the sources of radionuclides in water are, where high levels have been found in Texas, how they affect health and how to treat water to remove them.

Lesikar, Bruce J.; Melton, Rebecca; Hare, Michael; Hopkins, Janie; Dozier, Monty

2006-08-04T23:59:59.000Z

392

Utility Scale Renewable Energy Development Near DOD Installations: Making the Case for Land Use Compatitbility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mike Aimone, P.E. Mike Aimone, P.E. National Security Global Business Battelle Memorial Institute Utility Scale Renewable Energy Development near DOD Installations Making the Case for Land Use Compatibility Comments expressed are strictly those of the Briefer, and not necessarily the views or positions of the Battelle Memorial Institute or the Department of Defense 2 Sizing the Issue * Utility scale renewable energy development near DOD installations, ranges and Military Operational Areas/Special Use Airspace can affect mission operations and readiness * In the US, Land Use Planning is a "states-right" issue - tied to "Police Powers" - Goal: Acceptable zoning rules and consistent zoning

393

Design and installation considerations for refrigerant charged thermosyphoning solar DHW systems  

SciTech Connect

The recent introduction of refrigerants into the realm of passive solar technologies has provided some advantages in performance over the typical liquid solar domestic hot water system. These advantages can be offset by the lack of familiarity by designers or installers with the operation, layout or components of a phase-change thermosyphon water heater. The considerations which were evaluated in the design and installation of a passive solar domestic hot water system in Golden, Colorado, are described. A discussion of collector selection, storage and heat exchanger design, refrigerant type selection, system integration design, and refrigeration requirements is presented.

DeAngelis, M.; Nordham, D.

1980-01-01T23:59:59.000Z

394

Safeguards-by-Design: Guidance for Independent Spent Fuel Dry Storage Installations (ISFSI)  

SciTech Connect

This document summarizes the requirements and best practices for implementing international nuclear safeguards at independent spent fuel storage installations (ISFSIs), also known as Away-from- Reactor (AFR) storage facilities. These installations may provide wet or dry storage of spent fuel, although the safeguards guidance herein focuses on dry storage facilities. In principle, the safeguards guidance applies to both wet and dry storage. The reason for focusing on dry independent spent fuel storage installations is that this is one of the fastest growing nuclear installations worldwide. Independent spent fuel storage installations are typically outside of the safeguards nuclear material balance area (MBA) of the reactor. They may be located on the reactor site, but are generally considered by the International Atomic Energy Agency (IAEA) and the State Regulator/SSAC to be a separate facility. The need for this guidance is becoming increasingly urgent as more and more nuclear power plants move their spent fuel from resident spent fuel ponds to independent spent fuel storage installations. The safeguards requirements and best practices described herein are also relevant to the design and construction of regional independent spent fuel storage installations that nuclear power plant operators are starting to consider in the absence of a national long-term geological spent fuel repository. The following document has been prepared in support of two of the three foundational pillars for implementing Safeguards-by-Design (SBD). These are: i) defining the relevant safeguards requirements, and ii) defining the best practices for meeting the requirements. This document was prepared with the design of the latest independent dry spent fuel storage installations in mind and was prepared specifically as an aid for designers of commercial nuclear facilities to help them understand the relevant international requirements that follow from a countrys safeguards agreement with the IAEA. If these requirements are understood at the earliest stages of facility design, it will help eliminate the costly retrofit of facilities that has occurred in the past to accommodate nuclear safeguards, and will help the IAEA implement nuclear safeguards worldwide, especially in countries building their first nuclear facilities. It is also hoped that this guidance document will promote discussion between the IAEA, State Regulator/SSAC, Project Design Team, and Facility Owner/Operator at an early stage to ensure that new ISFSIs will be effectively and efficiently safeguarded. This is intended to be a living document, since the international nuclear safeguards requirements may be subject to revision over time. More importantly, the practices by which the requirements are met are continuously modernized by the IAEA and facility operators for greater efficiency and cost effectiveness. As these improvements are made, it is recommended that the subject guidance document be updated and revised accordingly.

Trond Bjornard; Philip C. Durst

2012-05-01T23:59:59.000Z

395

Training Community College faculty in the techniques and skills required for Solar Energy System installation  

SciTech Connect

A project to train a specified number of community college, vocational/technical faculty in the techniques and skills required to install solar energy systems is described. The planning that led to the contract, the development and conduct of the training workshops, and the outcomes are detailed. An overall evaluation of the project and recommendations for the future are included. (MHR)

Leo, R.J.

1980-05-01T23:59:59.000Z

396

Utility Investment in Optical Voltage and Current Measurement Technology: Five Installation Case Studies  

Science Conference Proceedings (OSTI)

In late 1999, EPRI polled utility members asking them what optical sensor projects EPRI should work on in 2000 and 2001. One recommendation was to develop a series of case studies on utility experiences. This report documents five installation case studies involving optical voltage and current measurement technology.

2001-12-11T23:59:59.000Z

397

Trojan Nuclear Plant Decommissioning: Final Survey for the Independent Spent Fuel Storage Installation Site  

Science Conference Proceedings (OSTI)

This report describes the final radiological survey for the area where Portland General Electric (PGE) will construct the Independent Spent Fuel Storage Installation (ISFSI) at Trojan nuclear power plant. The survey fulfills the requirements for release of this area from Trojan's 10 CFR 50 license before radiation levels increase with spent fuel storage in the ISFSI.

1998-05-13T23:59:59.000Z

398

Measure Guideline: Installing Rigid Foam Insulation on the Interior of Existing Brick Walls  

Science Conference Proceedings (OSTI)

This measure guideline provides information on an effective method to insulate the interior of existing brick masonry walls with extruded polystyrene (XPS) insulation board. The guide outlines step-by-step design and installation procedures while explaining the benefits and tradeoffs where applicable. The authors intend that this document be useful to a varied audience that includes builders, remodelers, contractors and homeowners.

Natarajan, H.; Klocke, S.; Puttagunta, S.

2012-06-01T23:59:59.000Z

399

Installing VTK 4.1.x on a windows PC Revision: 1.8  

E-Print Network (OSTI)

with support for C++ and TCL/TK. Building VTK is the only way to get access to the patented algorithms since://aspn.activestate.com/ASPN/Downloads/ActiveTcl/ and install it in the default location C:\\Tcl\\. As an alternative a light version of TCL/TK can be downloaded

400

Solar Schools Assessment and Implementation Project: Financing Options for Solar Installations on K-12 Schools  

DOE Green Energy (OSTI)

This report focuses on financial options developed specifically for renewable energy and energy efficiency projects in three California public school districts. Solar energy systems installed on public schools have a number of benefits that include utility bill savings, reductions in greenhouse gas emissions (GHGs) and other toxic air contaminants, job creation, demonstrating environmental leadership, and creating learning opportunities for students. In the 2011 economic environment, the ability to generate general-fund savings as a result of reducing utility bills has become a primary motivator for school districts trying to cut costs. To achieve meaningful savings, the size of the photovoltaic (PV) systems installed (both individually on any one school and collectively across a district) becomes much more important; larger systems are required to have a material impact on savings. Larger PV systems require a significant financial commitment and financing therefore becomes a critical element in the transaction. In simple terms, school districts can use two primary types of ownership models to obtain solar installations and cost savings across a school district. The PV installations can be financed and owned directly by the districts themselves. Alternatively, there are financing structures whereby another entity, such as a solar developer or its investors, actually own and operate the PV systems on behalf of the school district. This is commonly referred to as the 'third-party ownership model.' Both methods have advantages and disadvantages that should be weighed carefully.

Coughlin, J.; Kandt, A.

2011-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "installation problems bullet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Annual Report on U.S. Wind Power Installation, Cost, and  

E-Print Network (OSTI)

industry trends · Evolution of wind pricing · Installed wind project costs · Wind turbine transaction turbines and projects over 50 kW in size · Data sources include AWEA, EIA, FERC, SEC, etc. (see full report PercentofAnnualCapacityAdditions 0 20 40 60 80 100 TotalAnnualCapacityAdditions(GW) Wind Other Renewable Gas

402

PowerView monitoring system for instant power consumption in tritium separation technological installations  

Science Conference Proceedings (OSTI)

The paper shows the development of some integrated systems for monitoring and control of instant power consumption in normal and abnormal operation mode of tritium separation technological installations, with the view of reducing energy losses, supports ... Keywords: monitoring systems, power consumption

Carmen Maria Moraru; Ciprian Ciprian Bucur; Iulia Stefan; Ovidiu Balteanu

2011-07-01T23:59:59.000Z

403

Secure Safety: Secure Remote Access to Critical Safety Systems in Offshore Installations  

Science Conference Proceedings (OSTI)

Safety Instrumented Systems (SIS) as defined in IEC 61508 and IEC 61511 are very important for the safety of offshore oil & natural gas installations. SIS typically include the Emergency Shutdown System (ESD) that ensures that process systems return ... Keywords: Offshore, Process Control, Safety Instrumented Systems, Secure remote access

Martin Gilje Jaatun; Tor Olav Grtan; Maria B. Line

2008-06-01T23:59:59.000Z

404

TIAA: A Toolkit for Intrusion Alert Analysis (Version 0.4) Installation and Operation Manual  

E-Print Network (OSTI)

TIAA: A Toolkit for Intrusion Alert Analysis (Version 0.4) Installation and Operation Manual 1 Introduction The Toolkit for Intrusion Alert Analysis(TIAA) was developed based on previous Intrusion Alert Correlator [3]. The primary goal of TIAA is to provide system support for interactive analysis of intrusion

Ning, Peng

405

Installation and Operation Manual for TIAA v0.3 1 Introduction  

E-Print Network (OSTI)

Installation and Operation Manual for TIAA v0.3 Yiquan Hu 1 Introduction The Toolkit for Intrusion Alert Analysis(TIAA) was developed based on previous Intrusion Alert Cor- relator [3]. The primary goal of TIAA is to provide system support for interactive analysis of intrusion alerts reported by IDSs. Some

Ning, Peng

406

TIAA: A Toolkit for Intrusion Alert Analysis (Version 1.0) Installation and Operation Manual  

E-Print Network (OSTI)

TIAA: A Toolkit for Intrusion Alert Analysis (Version 1.0) Installation and Operation Manual 1 Introduction The Toolkit for Intrusion Alert Analysis(TIAA) was developed based on previous Intrusion Alert Correlator [3]. The primary goal of TIAA is to provide system support for interactive analysis of intrusion

Ning, Peng

407

Potential for substitution of geothermal energy at domestic defense installations and White Sands Missile Range  

DOE Green Energy (OSTI)

Geothermal resources that might provide substitute energy at any of 76 defense installations are identified and evaluated. The geologic characteristics and related economics of potential geothermal resources located at or near the 76 installations were estimated. The geologic assessment identified 18 installations with possible geothermal resources and 4 Atlantic Coastal Plain resource configurations that represented the alternatives available to East Coast bases. These 18 locations and 4 resource configurations, together with 2 possible resources at the White Sands Missile Range and a potential resource at Kings Bay, Georgia, were examined to determine the relative economics of substituting potential geothermal energy for part or all of the existing oil, gas, and electrical energy usage. Four of the military installations - Mountain Home, Norton, Hawthorne, and Sierra - appear to be co-located with possible geothermal resources which, if present, might provide substitute energy at or below current market prices for oil. Six additional locations - Ellsworth, Luke, Williams, Bliss, Fallon, and Twentynine Palms - could become economically attractive under certain conditions. No geothermal resource was found to be economically competitive with natural gas at current controlled prices. Generation of electric power at the locations studied is estimated to be uneconomic at present.

Bakewell, C.A.; Renner, J.L.

1982-01-01T23:59:59.000Z

408

Solar heating and cooling of residential buildings: sizing, installation and operation of systems. 1980 edition  

DOE Green Energy (OSTI)

This manual was prepared as a text for a training course on solar heating and cooling of residential buildings. The course and text are directed toward sizing, installation, operation, and maintenance of solar systems for space heating and hot water supply, and solar cooling is treated only briefly. (MHR)

None

1980-09-01T23:59:59.000Z

409

Transportation Services Fueling Operation Transportation Services has installed a software system that will facilitate fueling of  

E-Print Network (OSTI)

Transportation Services Fueling Operation Transportation Services has installed a software system into this system. All University vehicles that wish to fuel at UH M noa Transportation Services will be required the application below and submit your application to Transportation Services before attempting to fuel your

410

Financing Solar Installations with New Markets Tax Credits: Denver, Colorado (Fact Sheet)  

SciTech Connect

Fact sheet provides a brief overview of New Markets Tax Credits (NMTCs), a third-party financing incentive for solar installations in the public sector. NMTCs are intended to encourage economic activity in low-income and disadvantaged neighborhoods. The use of NMTCs in an innovative solar project transaction by the City of Denver, Colorado, is highlighted.

Coughlin, J.

2010-09-01T23:59:59.000Z

411

Beam Position and Phase Monitors Characterized and Installed in the LANSCE CCL  

SciTech Connect

The Los Alamos Neutron Science Center - Risk Mitigation Project is in the process of replacing older Coupled-Cavity-Linac (CCL) Beam-Position Monitors (BPMs) with newer Beam Position and Phase Monitors (BPPMs) and their associated electronics and cable plants. In many locations, these older BPMs include a separate Delta-T loop for measuring the beam's central phase and energy. Thirty-one BPPMs have been installed and many have monitored the charged particle beam. The installation of these newer BPPMs is the first step to installing complete BPPM measurement systems. Prior to the installation, a characterization of each BPPM took place. The characterization procedure includes a mechanical inspection, a vacuum testing, and associated electrical tests. The BPPM electrical tests for all four electrodes include contact resistance measurements, Time Domain Reflectometer (TDR) measurements, relative 201.25-MHz phase measurements, and finally a set of position-sensitive mapping measurements were performed which included associated fitting routines. This paper will show these data for a typical characterized BPPM.

Gilpatrick, John D [Los Alamos National Laboratory; Kutac, Vincent G. [Los Alamos National Laboratory; Martinez, Derwin [Los Alamos National Laboratory; McCrady, Rodney C. [Los Alamos National Laboratory; O'Hara, James F. [Los Alamos National Laboratory; Olivas, Felix R. [Los Alamos National Laboratory; Shurter, Robert B. [Los Alamos National Laboratory; Watkins, Heath A. [Los Alamos National Laboratory

2012-04-11T23:59:59.000Z

412

Stand-Alone Solar Electric Systems: The Earthscan Expert Handbook on Planning, Design and Installation  

Science Conference Proceedings (OSTI)

One of the best ways to get power to remote, off-grid locations, whether in developed or developing countries, is through the use of solar electric systems.This practical guide describes how to plan, design and install solar electric systems in a manner ...

Mark Hankins

2010-07-01T23:59:59.000Z

413

Solar Schools Assessment and Implementation Project: Financing Options for Solar Installations on K-12 Schools  

SciTech Connect

This report focuses on financial options developed specifically for renewable energy and energy efficiency projects in three California public school districts. Solar energy systems installed on public schools have a number of benefits that include utility bill savings, reductions in greenhouse gas emissions (GHGs) and other toxic air contaminants, job creation, demonstrating environmental leadership, and creating learning opportunities for students. In the 2011 economic environment, the ability to generate general-fund savings as a result of reducing utility bills has become a primary motivator for school districts trying to cut costs. To achieve meaningful savings, the size of the photovoltaic (PV) systems installed (both individually on any one school and collectively across a district) becomes much more important; larger systems are required to have a material impact on savings. Larger PV systems require a significant financial commitment and financing therefore becomes a critical element in the transaction. In simple terms, school districts can use two primary types of ownership models to obtain solar installations and cost savings across a school district. The PV installations can be financed and owned directly by the districts themselves. Alternatively, there are financing structures whereby another entity, such as a solar developer or its investors, actually own and operate the PV systems on behalf of the school district. This is commonly referred to as the 'third-party ownership model.' Both methods have advantages and disadvantages that should be weighed carefully.

Coughlin, J.; Kandt, A.

2011-10-01T23:59:59.000Z

414

Design and installation package for the Sunmat Flat Plate Solar Collector  

DOE Green Energy (OSTI)

The information used in evaluating the design of the Sunmat Liquid Flat Plat Plate Solar Collector developed by Calmac Manufacturing Company is presented. Included in this package are the Subsystem Performance Specification, Installation, Operation and Maintenance Manuals, collector sizing guides, and detailed drawings of the single-glazed collector.

Not Available

1978-03-01T23:59:59.000Z

415

ProjectBrochure Manhattanville in West Harlem Installation of New Sewer and  

E-Print Network (OSTI)

Sewer Project Project Brochure Borough: Manhattan Project Description: New Storm and Combined StormProjectBrochure Manhattanville in West Harlem Installation of New Sewer and Upgrade of Combined/Sanitary Sewers Project Start: September 15, 2009 Tentative Project Completion: Spring 2011 Project Cost

Qian, Ning

416

Site data acquisition subsystem (SDAS) Mod 1, installation, operation, and maintenance manual  

DOE Green Energy (OSTI)

The Site Data Acquisition Subsystem (SDAS) Mod 1 is designed to collect sensor measurement data from a solar energy demonstration site. A brief description of the SDAS is given and the installation requirements and procedures, the operations description and the procedures for field maintenance of the subsystem are defined.

Not Available

1977-10-29T23:59:59.000Z

417

New Berkeley Lab Report Tracks a Decade of PV Installed Cost Trends  

DOE Green Energy (OSTI)

Installations of PV systems have been expanding at a rapid pace in recent years. In the United States, the market for PV is driven by national, state, and local government incentives, including upfront cash rebates, production-based incentives, requirements that electricity suppliers purchase a certain amount of solar energy, and Federal and state tax benefits. These programs are, in part, motivated by the popular appeal of solar energy and by the positive attributes of PV - e.g., modest environmental impacts, avoidance of fuel price risks, coincidence with peak electrical demand, and the location of PV at the point of use. Given the relatively high cost of PV, however, a key goal of these policies is to encourage cost reductions over time. Therefore, as policy incentives have become more significant and as PV deployment has accelerated, so too has the desire to track the installed cost of PV systems over time, by system characteristics, by system location, and by component. A new Lawrence Berkeley National Laboratory report, 'Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007', helps to fill this need by summarizing trends in the installed cost (i.e., the cost paid by the system owner) of grid-connected PV systems in the U.S. The report is based on an analysis of project-level cost data from nearly 37,000 residential and non-residential PV systems completed from 1998-2007 and installed on the utility-customer-side of the meter. These systems total 363 MW, equal to 76% of all grid-connected PV capacity installed in the U.S. through 2007, representing the most comprehensive data source available on the installed cost of PV in the United States. The data were obtained from administrators of PV incentive programs around the country, who typically collect installed cost data for systems receiving incentives. A total of 16 programs, spanning 12 states, ultimately provided data for the study. Reflecting the broader geographical trends in the U.S. PV market, the vast majority of the systems in the data sample are located in California (83%, by capacity) and New Jersey (12%), The remaining systems are located in Arizona, Connecticut, Illinois, Massachusetts, Maryland, Minnesota, New York, Oregon, Pennsylvania, and Wisconsin. The PV systems in the dataset range in size from 100 W to 1.3 MW, almost 90% of which are smaller than 10 kW. This article briefly summarizes some of the key findings from the Berkeley Lab study (the full report can be downloaded at http://eetd.lbl.gov/ea/emp/re-pubs.html). The article begins by summarizing trends related to the installed cost of PV systems prior to receipt of any financial incentives, and then discusses how changes in incentive levels over time and variation across states have impacted the net installed cost of PV to the customer, after receipt of incentives. Note that all cost and incentive data are presented in real 2007 dollars (2007$), and all capacity and dollars-perwatt ($/W) data are presented in terms of rated module power output under Standard Test Conditions (DC-STC).

Barbose, Galen; Peterman, Carla; Wiser, Ryan

2009-04-15T23:59:59.000Z

418

Pemex: Problems and Policy Options  

E-Print Network (OSTI)

American Studies University of California, Berkeley Pemex: Problems and Policy Options David Shields Independent Energy

Shields, David

2006-01-01T23:59:59.000Z

419

Solving the Fast Clock Problem  

Science Conference Proceedings (OSTI)

This power quality (PQ) case study troubleshoots then solves the problem of digital clocks running fast.

2003-12-31T23:59:59.000Z

420

Tracking the Sun IV: An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010  

E-Print Network (OSTI)

capacity installed in the United States through 2010 and representing one of the most comprehensive sources

Darghouth, Naim

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "installation problems bullet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Field Test and Performance Verification: Integrated Active Desiccant Rooftop Hybrid System Installed in a School - Final Report: Phase 4A  

SciTech Connect

This report summarizes the results of a field verification pilot site investigation that involved the installation of a hybrid integrated active desiccant/vapor-compression rooftop heating, ventilation, and air-conditioning (HVAC) unit at an elementary school in the Atlanta Georgia area. For years, the school had experienced serious humidity and indoor air quality (IAQ) problems that had resulted in occupant complaints and microbial (mold) remediation. The outdoor air louvers of the original HVAC units had been closed in an attempt to improve humidity control within the space. The existing vapor compression variable air volume system was replaced by the integrated active desiccant rooftop (IADR) system that was described in detail in an Oak Ridge National Laboratory (ORNL) report published in 2004 (Fischer and Sand 2004). The IADR system and all space conditions have been monitored remotely for more than a year. The hybrid system was able to maintain both the space temperature and humidity as desired while delivering the outdoor air ventilation rate required by American Society of Heating, Refrigerating and Air-Conditioning Engineers Standard 62. The performance level of the IADR unit and the overall system energy efficiency was measured and found to be very high. A comprehensive IAQ investigation was completed by the Georgia Tech Research Institute before and after the system retrofit. Before-and-after data resulting from this investigation confirmed a significant improvement in IAQ, humidity control, and occupant comfort. These observations were reported by building occupants and are echoed in a letter to ORNL from the school district energy manager. The IADR system was easily retrofitted in place of the original rooftop system using a custom curb adapter. All work was completed in-house by the school's maintenance staff over one weekend. A subsequent cost analysis completed for the school district by the design engineer of record concluded that the IADR system being investigated was actually less expensive to install than other less-efficient options, most of which were unable to deliver the required ventilation while maintaining the desired space humidity levels.

Fischer, J

2005-12-21T23:59:59.000Z

422

Preliminary assessment report for Grubbs/Kyle Training Center, Smyrna/Rutherford County Regional Airport, Installation 47340, Smyrna, Tennessee. Installation Restoration Program  

SciTech Connect

This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Tennessee Army National Guard (TNARNG) property near Smyrna, Tennessee. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Grubbs/Kyle Training Center property, the requirement of the Department of Defense Installation Restoration Program.

Dennis, C.; Stefano, J.

1993-07-01T23:59:59.000Z

423

Energy Saving 'Cool Roofs' Installed at Y-12 | Y-12 National Security  

NLE Websites -- All DOE Office Websites (Extended Search)

Saving 'Cool ... Saving 'Cool ... Energy Saving 'Cool Roofs' Installed at Y-12 Posted: October 17, 2012 - 4:08pm The Y-12 National Security Complex has taken additional steps to reduce its energy costs by installing almost 100,000 square feet of new heat reflective "cool" roofs at the Oak Ridge, Tennessee facility. The latest Y-12 cool roofs were added to Buildings 9204-2E and 9103. Fifteen percent of roofs at Y-12 are currently equipped with cool roof technology. This technology is expected to be applied to the majority of the roofs at Y-12. "Replacing older, heat-absorbing roofs with the heat-reflective cool roofs is part of NNSA's strategy to achieve energy and cost efficiencies," said Robert "Dino" Herrera, Facilities and Infrastructure Recapitalization Program Manager. "We strive to lead the

424

Microsoft Word - CX-RossComplexComcastFiberInstall_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30, 2011 30, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Dawneen Dostert Realty Specialist - TERR-LMT Proposed Action: Allow installation of new fiber optic cable PP&A Project No.: 1866 Budget Information: Work Order # 00184006 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.7 Adding fiber optic cable to transmission structures or burying fiber optic cable in existing transmission line rights-of-way. Location: Ross Complex, Vancouver, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to allow Comcast Cable Communications, Inc. (Comcast) to install fiber optic cable to the existing T-Mobile cellular facility located at the

425

Lessons Learned from Net Zero Energy Assessments and Renewable Energy Projects at Military Installations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned from Lessons Learned from Net Zero Energy Assessments and Renewable Energy Projects at Military Installations Michael Callahan, Kate Anderson, Sam Booth, Jessica Katz, and Tim Tetreault Technical Report NREL/TP-7A40-51598 Revised September 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Lessons Learned from Net Zero Energy Assessments and Renewable Energy Projects at Military Installations Michael Callahan, Kate Anderson, Sam Booth, Jessica Katz, and Tim Tetreault

426

Pantex installs new meters to help to reduce energy consumption | National  

NLE Websites -- All DOE Office Websites (Extended Search)

meters to help to reduce energy consumption | National meters to help to reduce energy consumption | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Pantex installs new meters to help to ... Pantex installs new meters to help to reduce energy consumption Posted By Office of Public Affairs Project Manager Janice Clark gives a safety briefing.

427

Solar Schools Assessment and Implementation Project: Financing Options on Solar Installations on K-12 Schools  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Schools Assessment and Solar Schools Assessment and Implementation Project: Financing Options for Solar Installations on K-12 Schools J. Coughlin and A. Kandt National Renewable Energy Laboratory Technical Report NREL/TP-7A40-51815 October 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Solar Schools Assessment and Implementation Project: Financing Options for Solar Installations on K-12 Schools J. Coughlin and A. Kandt National Renewable Energy Laboratory Prepared under Task No. SM10.18J1

428

PV Installation Labor Market Analysis and PV JEDI Tool Developments (Presentation), NREL (National Renewable Energy Laboratory)  

NLE Websites -- All DOE Office Websites (Extended Search)

PV Installation Labor Market Analysis PV Installation Labor Market Analysis and PV JEDI Tool Developments Barry Friedman NREL Strategic Energy Analysis Center May 16, 2012 World Renewable Energy Forum Denver, Colorado NREL/PR-6A20-55130 NATIONAL RENEWABLE ENERGY LABORATORY Disclaimer 2 DISCLAIMER AGREEMENT These information ("Data") are provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy LLC ("Alliance") for the U.S. Department of Energy (the "DOE"). It is recognized that disclosure of these Data is provided under the following conditions and warnings: (1) these Data have been prepared for reference purposes only; (2) these Data consist of forecasts, estimates or assumptions made on a best-

429

Net Zero Energy Military Installations: A Guide to Assessment and Planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net Zero Energy Military Net Zero Energy Military Installations: A Guide to Assessment and Planning Samuel Booth, John Barnett, Kari Burman, Josh Hambrick and Robert Westby Technical Report NREL/TP-7A2-48876 August 2010 Technical Report Net Zero Energy Military NREL/TP-7A2-48876 Installations: A Guide to August 2010 Assessment and Planning Samuel Booth, John Barnett, Kari Burman, Josh Hambrick and Robert Westby Prepared under Task No. IDOD.1010 National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Operated by the Alliance for Sustainable Energy, LLC Contract No. DE-AC36-08-GO28308 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government.

430

Electric Vehicle Grid Integration for Sustainable Military Installations (Presentation), National Renewable Energy Laboratory (NREL)  

NLE Websites -- All DOE Office Websites (Extended Search)

Electric Vehicle Grid Integration for Electric Vehicle Grid Integration for Sustainable Military Installations NDIA Joint Service Power Expo Mike Simpson Mike.Simpson@NREL.gov 5 May 2011 NREL/PR-5400-51519 NATIONAL RENEWABLE ENERGY LABORATORY Agenda 2 1. NREL Transportation Research 2. Net Zero Energy Installations (NZEI) 3. Fort Carson as a Case Study - Vehicles On-Site - Utility Operations - Vehicle Charge Management 4. Full Fleet Simulation 5. Continuing Work NATIONAL RENEWABLE ENERGY LABORATORY NREL is the only national laboratory solely dedicated to advancing renewable energy and energy efficiency. Our employees are committed to building a cleaner, sustainable world. Photo Credits: NREL 3 NATIONAL RENEWABLE ENERGY LABORATORY What is Electric Vehicle Grid Integration (EVGI)? 4 Cross Cutting Enablers Grid / Renewables

431

Pantex installs new meters to help to reduce energy consumption | National  

National Nuclear Security Administration (NNSA)

meters to help to reduce energy consumption | National meters to help to reduce energy consumption | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Pantex installs new meters to help to ... Pantex installs new meters to help to reduce energy consumption Posted By Office of Public Affairs Project Manager Janice Clark gives a safety briefing.

432

INSTALLATION MAG~NiX.ILRI DIVI8ION, CAN.fAN,CONN.  

Office of Legacy Management (LM)

INSTALLATION INSTALLATION MAG~NiX.ILRI DIVI8ION, CAN.fAN,CONN. .PERI,jD Aiq~+ 1, i950 TO: August 31, 195 .:\,.:. ,,., WORK SHEET FOR: I b WSIGNOR I. v DowChemical Go. Velasco, Texas ., Azlterprise Meetala cc Brooklyn, New York Meili $Worthin&m Hatboro, ?'a. LOT NO. '... I [ATERIAL SYnB,fJL KEASURED' NET WT. 100,007~ ( 4;020 I ! 19 ~, ANALYBIS % METAL/100 r, Noi. 23) METAL CONTENT INSTRUCTIONS: This sheet% will be Used.ln.preDarlng Haterlal Balance. 'The totals from the various ltams listed above ~111 be Inserted on the Material Balance Summary Sheet. Shipments ~111 he llated on this Work'Sheet separately With the-ConsIgnor and Consignee of each Shipment noted; Copies Of thls sheet ~111 accompany the naterlal Balance Summary Sheet at the end of the'month.

433

Solar heating and hot water system installed at Shoney's Restaurant, North Little Rock, Arkansas. Final report  

Science Conference Proceedings (OSTI)

The solar heating system is designed to supply a major portion of the space and water heating requirements for a newly built Shoney's Big Boy Restaurant which was installed with completion occurring in December 1979. The restaurant has a floor space of approximately 4,650 square feet and requires approximately 1500 gallons of hot water daily. The solar energy system consists of 1,428 square feet of Chamberlain flat plate liquid collector subsystem, and a 1500 gallon storage subsystem circulating hot water producing 321 x 10/sup 6/ Btu/yr (specified) building heating and hot water heating. Designer - Energy Solutions, Incorporated. Contractor - Stephens Brothers, Incorporated. This report includes extracts from site files, specification references for solar modifications to existing building heating and hot water systems, drawings installation, operation and maintenance instructions.

Not Available

1980-08-01T23:59:59.000Z

434

Biased insert for installing data transmission components in downhole drilling pipe  

DOE Patents (OSTI)

An apparatus for installing data transmission hardware in downhole tools includes an insert insertable into the box end or pin end of drill tool, such as a section of drill pipe. The insert typically includes a mount portion and a slide portion. A data transmission element is mounted in the slide portion of the insert. A biasing element is installed between the mount portion and the slide portion and is configured to create a bias between the slide portion and the mount portion. This biasing element is configured to compensate for varying tolerances encountered in different types of downhole tools. In selected embodiments, the biasing element is an elastomeric material, a spring, compressed gas, or a combination thereof.

Hall, David R. (Provo, UT); Briscoe, Michael A. (Lehi, UT); Garner, Kory K. (Payson, UT); Wilde, Tyson J. (Spanish Fork, UT)

2007-04-10T23:59:59.000Z

435

Installing Windows with Foam Sheathing on a Wood-Frame Wall  

SciTech Connect

Residential housing design continues to move toward the development of high-performance sustainable building systems. To be sustainable, a building must not only be efficient and durable but also economically viable. For these reasons, new methods of enclosure design have been examined that provide high thermal performance and long-term durability and also reduce material use (including waste), simplify or integrate systems and details, and potentially reduce overall initial costs of construction. One new idea relating to enclosure design is to use exterior foam insulating sheathing as the primary sheathing and drainage plane for the wall assembly. However, as with any building enclosure system, proper details for the management of water, vapor, and energy transfer is critical. Window systems need to be installed in such a way as to be consistent with principles of building science. Window installations also require an understanding of how to maintain the continuity of the drainage plane of the wall.

Not Available

2005-05-01T23:59:59.000Z

436

Solar site test module. [DOE/NASA solar heating and cooling demonstration installations  

SciTech Connect

A solar site test module using the Rockwell AIM 65 micro-computer is described. The module is designed to work at any site where an IBM site data acquisition system (SDAS) is installed and is intended primarily as a troubleshooting tool for DOE/NASA commercial solar heating and cooling system demonstration installations. It collects sensor information (temperatures, flow rates, etc.) and displays or prints it immediately in calibrated engineering units. It will read one sensor on demand, periodically read up to 10 sensors or periodically read all sensors. Performance calculations can also be included with sensor data. Unattended operation is possible to, e.g., monitor a group of sensors once per hour. Work is underway to add a data acquisition system to the test module so that it can be used at sites which have no SDAS.

Kissel, R.R.; Scott, D.R.

1980-07-01T23:59:59.000Z

437

System installation package for the new Hampshire Vocational Technical College, Manchester, N. H  

DOE Green Energy (OSTI)

Contemporary Systems, Incorporated of Jaffrey, New Hampshire, under NASA/MSFC Contract NAS8-32243 has taken its Series V Solar Heating System and developed it to a degree acceptable by local codes and regulatory agencies. The system is composed of the Series V warm air collector, the LCU-110 logic control unit and the USU-A universal switching and transport unit. The collector was originally conceived and designed as an integrated roof/wall system and provides a dual function in the structure. This document describes the above system which has been installed in the residential solar laboratory located at the New Hampshire Vocational Technical College in Manchester, N.H. In addition, it provides general guidelines which may be utilized in development of detailed installation plans and specifications, as well as instructions on operation and maintenance.

Not Available

1979-05-01T23:59:59.000Z

438

Broad Overview of Energy Efficiency and Renewable Energy Opportunities for Department of Defense Installations  

DOE Green Energy (OSTI)

The Strategic Environmental Research and Developmental Program (SERDP)/Environmental Security Technology Certification Program (ESTCP) is the Department of Defense?s (DOD) environmental science and technology program focusing on issues related to environment and energy for the military services. The SERDP/ESTCP Office requested that the National Renewable Energy Laboratory (NREL) provide technical assistance with strategic planning by evaluating the potential for several types of renewable energy technologies at DOD installations. NREL was tasked to provide technical expertise and strategic advice for the feasibility of geothermal resources, waste-to-energy technology, photovoltaics (PV), wind, microgrids, and building system technologies on military installations. This technical report is the deliverable for these tasks.

Anderson, E.; Antkowiak, M.; Butt, R.; Davis, J.; Dean, J.; Hillesheim, M.; Hotchkiss, E.; Hunsberger, R.; Kandt, A.; Lund, J.; Massey, K.; Robichaud, R.; Stafford, B.; Visser, C.

2011-08-01T23:59:59.000Z

439

Radiation Control Coatings Installed on Federal Buildings at Tyndall Air Force Base  

DOE Green Energy (OSTI)

The technical objectives of this CRADA comprise technology deployment and energy conservation efforts with the radiation control coatings industry and the utility sector. The results of this collaboration include a high-level data reporting, analysis and management system to support the deployment efforts. The technical objectives include successfully install, commission, operate, maintain and document the performance of radiation control coatings on roofs at Tyndall AFB and the Buildings Technology Center at the Oak Ridge National Laboratory; determine the life cycle savings that can be achieved by using radiation control coatings on entire roofs at Tyndall AFB, based on documented installed cost and operating maintenance costs with and without the coatings; determine if any specific improvements are required in the coatings before they can be successfully deployed in the federal sector; determine the most effective way to facilitate the widespread and rapid deployment of radiation control coatings in the federal sector; and clearly define any barriers to deployment.

Kaba, R.L.; Petrie, T.W.

1999-03-16T23:59:59.000Z

440

An overview of the sustainability of solid waste management at military installations  

SciTech Connect

Sustainable municipal solid waste management at military solutions necessitates a combined approach that includes waste reduction, alternative disposal techniques, and increased recycling. Military installations are unique because they often represent large employers in the region in which they are located, thereby making any practices they employ impact overall waste management strategies of the region. Solutions for waste sustainability will be dependent on operational directives and base location, availability of resources such as water and energy, and size of population. Presented in this paper are descriptions of available waste strategies that can be used to support sustainable waste management. Results presented indicate source reduction and recycling to be the most sustainable solutions. However, new waste-to-energy plants and composting have potential to improve on these well proven techniques and allow military installations to achieve sustainable waste management.

Borglin, S.; Shore, J.; Worden, H.; Jain, R.

2009-08-15T23:59:59.000Z

Note: This page contains sample records for the topic "installation problems bullet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Assembly and installation of the large coil test facility test stand  

SciTech Connect

The Large Coil Test Facility (LCTF) was built to test six tokamak-type superconducting coils, with three to be designed and built by US industrial teams and three provided by Japan, Switzerland, and Euratom under an international agreement. The facility is designed to test these coils in an environment which simulates that of a tokamak. The heart of this facility is the test stand, which is made up of four major assemblies: the Gravity Base Assembly, the Bucking Post Assembly, the Torque Ring Assembly, and the Pulse Coil Assembly. This paper provides a detailed review of the assembly and installation of the test stand components and the handling and installation of the first coil into the test stand.

Queen, C.C. Jr.

1983-01-01T23:59:59.000Z

442

Installation of the first Distributed Energy Storage System (DESS) at American Electric Power (AEP).  

DOE Green Energy (OSTI)

AEP studied the direct and indirect benefits, strengths, and weaknesses of distributed energy storage systems (DESS) and chose to transform its entire utility grid into a system that achieves optimal integration of both central and distributed energy assets. To that end, AEP installed the first NAS battery-based, energy storage system in North America. After one year of operation and testing, AEP has concluded that, although the initial costs of DESS are greater than conventional power solutions, the net benefits justify the AEP decision to create a grid of DESS with intelligent monitoring, communications, and control, in order to enable the utility grid of the future. This report details the site selection, construction, benefits and lessons learned of the first installation, at Chemical Station in North Charleston, WV.

Nourai, Ali (American Electric Power Company, Columbus, OH)

2007-06-01T23:59:59.000Z

443

Problem 2-Lexicographic Order  

E-Print Network (OSTI)

Problem: For complex numbers z = a + bi ? C and w = c + di ? C define z ? w if either a ordering of C. (Question I) Prove that this turns C into and ordered set. (Question II) Is this an ordered field? (no) (Question III) Does it have the least-upper-bound property? (no) We will first review the definitions of order and ordered set from Rudin [R]. We will then show that under the lexicographic ordering C is an ordered set. Definition 1. Let S be a set. An order on S is a relation, denoted by ?, with the following two properties: (i) If x ? S and y ? S then one and only one of the statements is true. x ? y, x = y, y ? x (ii) If x, y, z ? S, if x ? y and y ? z, then x ? z.

Jacob Bower

2008-01-01T23:59:59.000Z

444

Thermal Performance Impacts of Center-of-Glass Deflections in Installed  

NLE Websites -- All DOE Office Websites (Extended Search)

Thermal Performance Impacts of Center-of-Glass Deflections in Installed Thermal Performance Impacts of Center-of-Glass Deflections in Installed Insulating Glazing Units Title Thermal Performance Impacts of Center-of-Glass Deflections in Installed Insulating Glazing Units Publication Type Journal Article LBNL Report Number LBNL-5800E Year of Publication 2012 Authors Hart, Robert, Howdy Goudey, Dariush K. Arasteh, and Dragan C. Curcija Journal Energy and Buildings Volume 54 Issue November 2012 Pagination 453-460 Date Published 11/2012 Keywords concave, convex, deflection, field test, gap, insulating glass unit, thermal performance, thermal transmittance, u-factor Abstract This study examines the thermal performance impact of center-of-glass (COG) deflections in double- and triple-pane insulating glass units (IGUs) installed at several locations throughout the US. Deflection was measured during summer and winter temperatures; the results show that outdoor temperature variations can be represented a linear change in COG gap width in double- and triple-pane IGUs within the temperature ranges measured. However, the summer-winter temperature-induced deflection is similar in magnitude to the observed spread in COG deflection of similar units at the same temperature, which suggests that factors other than temperature are of equal importance in determining the in-situ deflection of windows. The effect of deflection on thermal performance depends on the IGU's designed gap. Units constructed with smaller-than-optimal gaps often exhibit significant U-factor change due to temperature-induced reduction in gap width. This effect is particularly problematic in high-performance triple glazing where small gap dimension changes can have a large impact on performance.

445

Environmental radiation real-time monitoring system permanently installed near Qinshan Nuclear Power Plant  

SciTech Connect

An environmental radiation real-time monitoring system with high pressure ionization chamber was developed. It has been installed permanently in the vicinity of Qinshan Nuclear Power Plant, the first built in mainland China. The system consists of four basic components: environmental radiation monitors; data communication network; a data processing center; and a remote terminal computer situated in Hangzhou. It has provided five million readings of environmental radiation levels as of January 1993. 8 refs., 1 fig., 3 tabs.

Minde Ding; Peiru Sheng; Zhangji Zhi [Suzhou Nuclear Research Institute, Jiangsu (China)

1996-03-01T23:59:59.000Z

446

DOE ORDER 5480.14, PHASE I - INSTALLATION ASSESSMENT FOR THE BETTIS ATOMIC POWER LABORATORY  

Office of Legacy Management (LM)

DOE ORDER 5480.14, PHASE I - INSTALLATION ASSESSMENT FOR THE BETTIS ATOMIC POWER LABORATORY Prepared for the U.S. Department of Energy by Westinghouse Electric Corporation West Mifflin, Pennsylvania 15122-0079 i' Vendor Contract Number: DE-ACll-76PN00014 : IAELE OF CONTENTS I. Executive Summary ............................................. 2. Introduction .................................................. a. Background......;.........................................i b. Authority .......................................................... : ; c. Purpose I ........................................................ 3 d Scope..................................................~..! e: Methodology...............................................! ........

447

Installation of a Devonian Shale Reservoir Testing Facility and acquisition of reservoir property measurements  

SciTech Connect

In October, a contract was awarded for the Installation of a Devonian Shale Reservoir Testing Facility and Acquisition of Reservoir Property measurements from wells in the Michigan, Illinois, and Appalachian Basins. Geologic and engineering data collected through this project will provide a better understanding of the mechanisms and conditions controlling shale gas production. This report summarizes the results obtained from the various testing procedures used at each wellsite and the activities conducted at the Reservoir Testing Facility.

Locke, C.D.; Salamy, S.P.

1991-09-01T23:59:59.000Z

448

Installation of a Devonian Shale Reservoir Testing Facility and acquisition of reservoir property measurements. Final report  

SciTech Connect

In October, a contract was awarded for the Installation of a Devonian Shale Reservoir Testing Facility and Acquisition of Reservoir Property measurements from wells in the Michigan, Illinois, and Appalachian Basins. Geologic and engineering data collected through this project will provide a better understanding of the mechanisms and conditions controlling shale gas production. This report summarizes the results obtained from the various testing procedures used at each wellsite and the activities conducted at the Reservoir Testing Facility.

Locke, C.D.; Salamy, S.P.

1991-09-01T23:59:59.000Z

449

Storing, Transporting and Installing Polymer Insulators: Viewing Guide for Educational Video  

Science Conference Proceedings (OSTI)

Although polymer insulators (alternatively called non-ceramic insulators (NCIs) or composite insulators) are very durable, they are not indestructible. Unlike glass or ceramic insulators, damage on polymer insulators is not only difficult to identify, it's likely to get worse over time. Therefore, the storing, transporting, and installation of polymer insulators must be done with care. EPRI has developed a video specifically to educate line crews in the proper techniques for handling polymer insulators, ...

2001-11-21T23:59:59.000Z

450

System design package for solar heating and cooling system installed at Akron, Ohio  

DOE Green Energy (OSTI)

This package contains information used to evaluate the design of Solaron's solar heating, cooling, and domestic hot water system. A conventional heat pump provides summer cooling and back-up heating (when solar energy is not available). Included in the package are such items as the design data brochure, system performance specification, system hazard analysis, spare parts list, and detailed design drawings. A Solaron solar system is installed in a single-family dwelling at Akron, Ohio, and at Duffield, Virginia.

Not Available

1979-04-01T23:59:59.000Z

451

Evaluation of an Advanced Radiation Shielding Material for Permanent Installation at an Operating Commercial Nuclear Reactor  

Science Conference Proceedings (OSTI)

The industry continues to investigate, validate, and implement new radiation field reduction measures in response to increased emphasis on reducing dose to workers. Many nuclear plants are interested in permanent shielding applications to further reduce personnel exposure and to reduce the recurring effort associated with temporary installations. In 2008, a flexible, impregnated, layered matrix material was identified as a possible material for incorporating a shielding substance. This report provides an...

2010-09-30T23:59:59.000Z

452

Annual Report on U.S. Wind Power Installation, Cost, and  

E-Print Network (OSTI)

transaction prices · Wind project performance · O&M cost trends · Integration/transmission/policy · Coming up is Reasonably Broad #12;10 Interest in Offshore Wind Continues in the U.S., but No Such Projects Are Yet Online · All wind projects installed in the U.S. to date are land-based · Some interest exists in offshore wind

453

Solar energy system installed at the North Georgia APDC office building  

DOE Green Energy (OSTI)

Information is provided on the solar energy system installed in the newly constructed office building of the North Georgia Area Planning and Development Commission near downtown Dalton, Georgia. This solar heating, cooling and hot water system supplies 65 to 70% of the cooling demand and 90 to 95% of the heating demand. There are 2,001 square feet of effective Revere collector area, and the absorption chiller is in Arkla model 300 and provides 16 tons of cooling.

Not Available

1979-08-01T23:59:59.000Z

454

Federal Grant Fully Funds Small Turbine Installation at Maine Senior Housing Complex  

DOE Green Energy (OSTI)

In March 2007, local agencies in Maine launched an effort to reduce energy costs for residents of a subsidized elderly housing complex in Winter Harbor, resulting in a federal Residential Energy Assistance Challenge (REACH) grant that entirely funded the installation of a 10-kW Bergey Excel turbine. This fact sheet describes the project, including difficulties encountered during the permitting process and a summary of the costs covered by the REACH grant.

Not Available

2008-01-01T23:59:59.000Z

455

Survey of End-Use Metering Equipment, Sensors, and Designers/Installers  

Science Conference Proceedings (OSTI)

End-use data metering technology has come of age in the last several years, with many new specialized products becoming available. This report represents the first survey of end-use metering and monitoring equipment and of sensors typically used with such equipment. It also surveys organizations that provide design and/or installation services for demand-side management metering and monitoring systems.

1992-10-01T23:59:59.000Z

456

Microsoft Word - Highlights Bullets.doc  

Gasoline and Diesel Fuel Update (EIA)

September 2004 September 2004 1 Short-Term Energy Outlook September 2004 Crude Oil and Petroleum Products (Figures 1 to 5) The average WTI spot price for August 2004 was $44.90 per barrel, about $3 above the average projected for August in last month's Outlook. The baseline WTI price projections have been raised slightly in the near term so that a monthly average price below $40 per barrel is not expected until about midway through 2005. Oil prices remain high even though OPEC is producing at its highest levels since OPEC began tracking quotas in 1982. OPEC (including Iraq) crude oil production in August was 29.7 million barrels per day, about the same as July levels (revised upwards from the last Outlook). World oil surplus production capacity is

457

Microsoft Word - Highlights Bullets.doc  

Gasoline and Diesel Fuel Update (EIA)

February 2004 February 2004 Winter Heating Fuel and Gasoline Costs (Figures 1 to 3) A cold January (6 percent colder than normal nationally and 19 percent colder than normal in the Northeast) kept fuel prices and heating demand high, diminishing the likelihood that cumulative heating costs for the winter will fall below last year's high levels. The current estimate for winter 2003-2004 household heating bills compared to winter 2002-2003 is as follows: natural gas- heated homes: up 11 percent; heating oil users: down 1 percent; propane-heated households: up 7 percent; and homes with electric heat: up about 2 percent. These projections are national average values - actual heating bill changes may vary widely by region due to differences in weather and fuel price

458

Microsoft Word - Highlights Bullets.doc  

Gasoline and Diesel Fuel Update (EIA)

May 2004 May 2004 1 Short-Term Energy Outlook May 2004 Summer Gasoline Update (Figures 1 to 3) Higher crude oil prices and rapid increases in mid-Spring spot prices for gasoline have induced an upward shift in the forecast for gasoline pump prices in this month's Short-Term Energy Outlook (Outlook). We now expect national average regular gasoline prices to be about $1.94 this summer (April through September), a significant rise over the $1.76 per gallon projected in the April Outlook. The June price is now expected to peak at about $2.03 per gallon according to the new national gasoline price trajectory, compared to a peak of $1.82 projected last month. The change in the outlook for gasoline prices reflects the increased pressure on oil markets since last month. For example, the West Texas

459

Microsoft Word - Highlights BulletsFinal.doc  

Gasoline and Diesel Fuel Update (EIA)

Short-Term Energy Outlook March 2004 Short-Term Energy Outlook March 2004 Gasoline Outlook (Figures 1 to 3) Gasoline inventories remained tight and crude oil prices rose again in February. The prospects for oil prices diminishing significantly prior to the driving season have weakened, and there is a high likelihood of additional gasoline price increases this spring. Even if unexpected significant refinery or pipeline disruptions are avoided, national monthly average regular gasoline pump prices are projected to reach a peak of about $1.83 per gallon this spring. Summer (April to September) gasoline prices are now expected to average about $1.74 per gallon this year. This would be a record in nominal dollar terms and the highest inflation-adjusted summer average since 1985. For 2004 as a whole, national

460

Microsoft Word - Highlights Bullets.doc  

Gasoline and Diesel Fuel Update (EIA)

December 2004 December 2004 1 Short-Term Energy Outlook December 2004 Winter Fuels Update (Figure 1) Lower petroleum and natural gas prices in this Outlook marginally reduced our projections of winter heating fuel prices and winter household heating fuel expenditures. Heating oil expenditures by typical Northeastern households are now expected to average 34 percent above last winter's levels, with residential fuel prices averaging $1.85 per gallon for the October-to-March period. Expenditures for propane-heated households are expected to increase about 22 percent this winter. Expected increases in expenditures for natural gas-heated households have also been lowered in this Outlook to 9 percent. The reduction

Note: This page contains sample records for the topic "installation problems bullet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Microsoft Word - Highlights Bullets.doc  

Gasoline and Diesel Fuel Update (EIA)

November 2004 November 2004 1 Short-Term Energy Outlook November 2004 Winter Fuels Update (Figure 1) Higher oil prices in this Outlook raised our projections for heating oil and propane prices and household heating fuel expenditures this winter. Heating oil expenditures by typical Northeastern households are now expected to average about 37 percent above last winter's levels (compared to our previous projection of a 28-percent increase), with average residential prices averaging $1.88 per gallon for the October-to-March period. Propane-heated households can expect to see increased expenditures of about 26 percent this winter (compared with a 22-percent increase projected last month). Expected increases in expenditures for natural gas-heated households remain the same as last month at about 15

462

Microsoft Word - Highlights BulletsFinal.doc  

Gasoline and Diesel Fuel Update (EIA)

December 2003 December 2003 Heating fuel and gasoline costs this winter (Figures 1 to 3) The outlook for winter 2003-2004 household heating bills remains mixed relative to 2002-2003: natural gas-heated homes: up 6 percent; heating oil users: down 4 percent; propane heated households: flat; and homes with electric heat: up about 2 percent. These projections are national average values - actual heating bill changes may vary widely by region due differences in weather and fuel price developments. The November average motor gasoline price (regular unleaded gasoline) fell to $1.51 per gallon. Motor gasoline prices have been drifting downward, as expected, following the late summer price surge. Due to the tight inventory situation, pump prices may level off

463

Microsoft Word - Highlights Bullets_Final.doc  

Gasoline and Diesel Fuel Update (EIA)

June 2004 June 2004 1 Short-Term Energy Outlook June 2004 Summer Gasoline Update (Figures 1 to 3) While it is difficult to know what will happen in the near term, especially in light of recent events related to expected supply developments and security issues in the Middle East in the last several weeks, the trend for U.S. gasoline wholesale and retail gasoline prices has turned downward. Week-to-week declines in the average price of regular gasoline of 1.3 cents per gallon and 1.7 cents per gallon, reported by EIA on June 1 and June 7, respectively, followed a month of increases to $2.06 per gallon in late May. Assuming that crude oil or gasoline market disruptions are avoided, the declines are expected to continue. We assume that, as a group, OPEC producers will maintain higher production

464

Draft STEO Bullets … December 2003  

Gasoline and Diesel Fuel Update (EIA)

9 9 1 January 2009 Short-Term Energy Outlook January 13, 2009 Release Highlights This edition of the Short-Term Energy Outlook is the first to include monthly forecasts through December 2010. The energy forecast is sensitive to economic conditions. In this forecast, U.S. real gross domestic product (GDP) is expected to decline by 2 percent in 2009, leading to decreases in domestic energy consumption for all major fuels. Economic recovery is projected to begin in 2010, with 2 percent year-over-year growth in GDP. In the past 6 months, the monthly average price of West Texas Intermediate (WTI) crude oil has fallen from $133 per barrel in July to $41 in December. WTI

465

Microsoft Word - Highlights Bullets.doc  

Gasoline and Diesel Fuel Update (EIA)

5 5 1 Short-Term Energy Outlook March 2005 Crude Oil and Petroleum Products (Figures 1 to 7) The projected average West Texas Intermediate (WTI) crude oil price for the first quarter of 2005 has been revised upward to about $48.70 per barrel, approximately $13 per barrel higher than in the first quarter of 2004 and $2 per barrel above the first quarter 2005 projection in the previous Outlook. EIA projects that WTI prices are likely to remain near the high-to-mid-$40's (or higher) per barrel range throughout 2005-2006. It is emphasized that oil prices are likely to be sensitive to any incremental supply tightness that appears during periods of peak demand

466

Microsoft Word - Highlights Bullets.doc  

Gasoline and Diesel Fuel Update (EIA)

October 2004 October 2004 1 Short-Term Energy Outlook October 2004 Winter Fuels Outlook This winter, residential space-heating expenditures are projected to increase for all fuel types compared to year-ago levels. Increases in heating fuel prices are likely to generate higher expenditures even in regions where demand for fuel is expected to fall. Average residential natural gas prices are expected to be 11 percent higher than they were last winter, and household expenditures are expected to be 15 percent higher. Heating oil prices are expected to average 29 percent higher compared with last winter and household expenditures are expected to be 28 percent higher. Propane prices are expected to average 17 percent above last winter, with 22 percent higher expenditures for propane-

467

Microsoft Word - Highlights Bullets.doc  

Gasoline and Diesel Fuel Update (EIA)

January 2004 January 2004 This edition of the Outlook provides projections through 2005 for the first time (details). Winter Heating Fuel and Gasoline Costs (Figures 1 to 3) The outlook for winter 2003-2004 household heating bills compared to winter 2002-2003 is as follows: natural gas-heated homes: up 8 percent; heating oil users: down 4 percent; propane-heated households: up 3 percent; and homes with electric heat: up about 2 percent. These projections are national average values - actual heating bill changes may vary widely by region due to differences in weather and fuel price developments. The December 2003 average motor gasoline price (regular unleaded gasoline) is estimated to have fallen to $1.48 per gallon from $1.51 in November. Due to high

468

Microsoft Word - Highlights Bullets Final.doc  

Gasoline and Diesel Fuel Update (EIA)

4 4 1 Short-Term Energy Outlook July 2004 Oil Market Developments (Figures 1 to 5) U.S. spot prices for crude oil (West Texas Intermediate (WTI)), while currently down from the highs above $40 per barrel seen in early June, continue to fluctuate in the upper $30's despite general improvement in crude oil inventories and increases in output by key OPEC producers, including Saudi Arabia. OPEC (excluding Iraq) crude oil production in June was 27.1 million barrels per day, 800,000 barrels per day higher than May levels and only about 1 million barrels per day below capacity. The overall level of petroleum inventories both in the United States and in the rest of the industrialized world remains below normal, particularly when seen in

469

Small Caliber Guided Bullet - Energy Innovation Portal  

Biomass and Biofuels; Building Energy ... A non-spinning projectile that is self-guided to a laser designated target and is configured to be fired from a small ...

470

Microsoft Word - Highlights Bullets.doc  

Annual Energy Outlook 2012 (EIA)

gasoline prices are likely to remain high and volatile through the summer. High crude oil costs, strong gasoline demand, low gasoline inventories, and more stringent gasoline...

471

Microsoft Word - Highlights Bullets.doc  

Annual Energy Outlook 2012 (EIA)

top of the normal range and spot prices have shown some weakness despite elevated crude oil costs. Average pump prices for regular gasoline are expected to drift toward the lower...

472

Kolkata Restaurant Problem as a generalised El Farol Bar Problem  

E-Print Network (OSTI)

Generalisation of the El Farol bar problem to that of many bars here leads to the Kolkata restaurant problem, where the decision to go to any restaurant or not is much simpler (depending on the previous experience of course, as in the El Farol bar problem). This generalised problem can be exactly analysed in some limiting cases discussed here. The fluctuation in the restaurant service can be shown to have precisely an inverse cubic behavior, as widely seen in the stock market fluctuations.

Chakrabarti, Bikas K

2007-01-01T23:59:59.000Z

473

Solar PV Manufacturing Cost Model Group: Installed Solar PV System Prices (Presentation)  

SciTech Connect

EERE's Solar Energy Technologies Program is charged with leading the Secretary's SunShot Initiative to reduce the cost of electricity from solar by 75% to be cost competitive with conventional energy sources without subsidy by the end of the decade. As part of this Initiative, the program has funded the National Renewable Energy Laboratory (NREL) to develop module manufacturing and solar PV system installation cost models to ensure that the program's cost reduction targets are carefully aligned with current and near term industry costs. The NREL cost analysis team has leveraged the laboratories' extensive experience in the areas of project finance and deployment, as well as industry partnerships, to develop cost models that mirror the project cost analysis tools used by project managers at leading U.S. installers. The cost models are constructed through a "bottoms-up" assessment of each major cost element, beginning with the system's bill of materials, labor requirements (type and hours) by component, site-specific charges, and soft costs. In addition to the relevant engineering, procurement, and construction costs, the models also consider all relevant costs to an installer, including labor burdens and overhead rates, supply chain costs, and overhead and materials inventory costs, and assume market-specific profits.

Goodrich, A. C.; Woodhouse, M.; James, T.

2011-02-01T23:59:59.000Z

474

Solar PV Manufacturing Cost Model Group: Installed Solar PV System Prices (Presentation)  

DOE Green Energy (OSTI)

EERE's Solar Energy Technologies Program is charged with leading the Secretary's SunShot Initiative to reduce the cost of electricity from solar by 75% to be cost competitive with conventional energy sources without subsidy by the end of the decade. As part of this Initiative, the program has funded the National Renewable Energy Laboratory (NREL) to develop module manufacturing and solar PV system installation cost models to ensure that the program's cost reduction targets are carefully aligned with current and near term industry costs. The NREL cost analysis team has leveraged the laboratories' extensive experience in the areas of project finance and deployment, as well as industry partnerships, to develop cost models that mirror the project cost analysis tools used by project managers at leading U.S. installers. The cost models are constructed through a "bottoms-up" assessment of each major cost element, beginning with the system's bill of materials, labor requirements (type and hours) by component, site-specific charges, and soft costs. In addition to the relevant engineering, procurement, and construction costs, the models also consider all relevant costs to an installer, including labor burdens and overhead rates, supply chain costs, and overhead and materials inventory costs, and assume market-specific profits.

Goodrich, A. C.; Woodhouse, M.; James, T.

2011-02-01T23:59:59.000Z

475

Energy measurements of attic radiant barriers installed in single-family houses  

Science Conference Proceedings (OSTI)

Testing was conducted by the Oak Ridge National Laboratory to determine the energy savings attributable to radiant barriers installed in attics of unoccupied single-family houses. Three levels of fiberglass attic insulation (R-11 ,R-19, and R-30) were tested with two types of barrier installation (horizontal and truss). The results showed that horizontally installed radiant barriers were more effective than truss barriers in reducing heating and cooling loads. Measured cooling load reductions ranged form 0 to 22% (compared to same attic insulation insulation R-value with no radiant barrier) and heating load changes from /plus/4% to /minus/10% were measured (compared to same attic insulation R-value with no radiant barrier). Radiant barriers appeared to decrease the heating and cooling loads more when lesser amounts of insulation (R-11 and R-19) were present in an attic. Minimal changes were measured when R-30 was present in an attic. Long-term effects of dust on the performance of radiant barriers as well as the effects of moisture condensing on the surface of a radiant barrier during cold winter temperatures remain unanswered.

Levins, W.P.; Karnitz, M.A.

1988-07-01T23:59:59.000Z

476

Demonstration of a utility industry horizontal drilling system: Horizontal well AMH-5 installation report  

SciTech Connect

The Department of Energy`s Office of Technology Development initiated an integrated demonstration of innovative technologies and systems for cleanup of VOCs in soils and groundwater at the Savannah River Site (SRS) in 1989. The overall goal of the program is demonstration of multiple technologies and systems in the fields of drilling, characterization, monitoring, and remediation at a single test bed. Innovative technologies are compared to one another and to baseline technologies in terms of technical performance and cost effectiveness. Transfer of successfully demonstrated technologies and systems to DOE environmental restoration organizations, to other government agencies, and to industry is a critical part of the program. Directional drilling has been shown to be a successful technique for enhancing access to the subsurface, thus improving remediation systems, especially remediation systems which perform in situ. Demonstration of an innovative directional drilling system at the Integrated Demonstration Site at the SRS, was initiated in June of 1992. The directional drilling system was designed to install an in situ remediation system. The drilling system is an experimental compaction/dry drilling technique developed by Charles Machine Works (Ditch Witch{reg_sign}) of Perry, Oklahoma. A horizontal well was installed in the M Area of the SRS below and parallel to an abandoned tile process sewer line. The installation of the horizontal well was a two-part process. Part one consisted of drilling the borehole, and part two was the horizontal well completion.

Not Available

1992-12-31T23:59:59.000Z

477

In 2001 Massachusetts' first modern wind turbine was installed in at Windmill Point, at the tip of the  

E-Print Network (OSTI)

, within 100 ft of the site of a 40 kW turbine (since removed) which was installed approximately 20 yearsIn 2001 Massachusetts' first modern wind turbine was installed in at Windmill Point, at the tip Laboratory and the Massachusetts Division of Energy Resources. The 660 kW turbine is close to the high school

Massachusetts at Amherst, University of

478

GHPGHPGHPGHPGHPsPayforThemselvessPayforThemselvessPayforThemselvessPayforThemselvessPayforThemselves The world's largest installation of geothermal heat  

E-Print Network (OSTI)

ThemselvessPayforThemselvessPayforThemselvessPayforThemselvessPayforThemselves The world's largest installation of geothermal heat pumps has proven that this technology can deliver big savings resulting from the retrofit. Geothermal heat pumps (GHPs) were installed in a comprehensive energy their qualifications to build and finance successful GHP-centered projects. (Geothermal heat pumps are also known

Oak Ridge National Laboratory

479

Design of control system for hydraulic lifting platform with jack-up wind-power installation vessel  

Science Conference Proceedings (OSTI)

Jack-up wind-power installation vessel is the most important tool in construction of wind farm. And the control system for hydraulic lifting platform is the key point of jack-up wind-power installation vessel. Therefore the design of the control system ... Keywords: hydraulic control, hydraulic lifting platform, programmable logic controller, wind-power

Xuejin Yang; Dingfang Chen; Mingwang Dong; Taotao Li

2012-11-01T23:59:59.000Z

480

Plan for the performance monitoring of solar systems installed by the SUIEDE program: NCAT/SUEDE interaction  

DOE Green Energy (OSTI)

The SUEDE Grantee solar system installation programs were reviewed to determine the type, number, and quality of Grantee-installed solar systems available for monitoring consideration. An NCAT Performance Monitoring Plan is presented which identifies the service and technical assistance that NCAT will need to provide based on the Grantee review. (MHR)

Hopkins, M

1979-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "installation problems bullet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

INSTALLATION CERTIFICATE CF-6R-MECH-23-HERS Verification of High EER Equipment (Page 1 of 1)  

E-Print Network (OSTI)

INSTALLATION CERTIFICATE CF-6R-MECH-23-HERS Verification of High EER Equipment (Page 1 of 1) Site Verification of High EER Equipment Procedures for verification of High EER Equipment are described in Reference or Identification/Tag 2 System Location or Area Served 3 Certified EER Rating of the installed equipment (Btu

482

Applying problem-structuring methods to problems in computer security  

Science Conference Proceedings (OSTI)

Solutions to security problems, particularly ones involving cryptography, have typically been approached through the Inside-Out Threat Model, "this is our solution and whatever it addresses is the threat". Email encryption/signing and SSL/TLS are two ... Keywords: problem-structuring methods, soft operations research, soft systems methodology, wicked problems

Peter Gutmann

2011-09-01T23:59:59.000Z

483