National Library of Energy BETA

Sample records for installation cxs applied

  1. Installations

    U.S. Energy Information Administration (EIA) Indexed Site

    Reporting companies, total number of: 81 Employment, full-time equivalent employees: 9,288 Module and/or cell manufacturing 33 Module or system design 23 Prototype module development 23 Prototype systems development 12 Wholesale distribution 42 Retail distribution 15 Installations 12 Other 8 90-100% 53 50-89% 6 10-49% 3 Less than 10% 19 Crystalline silicon: single-crystal modules 15 Crystalline silicon: cast modules 9 Thin-film: amorphous silicon modules 1 Thin-film: other modules 4

  2. Apply

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Applied Studies and Technology (AS&T) Applied Studies and Technology (AS&T) Applied Studies and Technology (AS&T) DOE established the Environmental Sciences Laboratory (ESL) in Grand Junction, Colorado, in 1991 to support its programs. ESL scientists perform applied research and laboratory-scale demonstrations of soil and groundwater remediation and treatment technologies. Capabilities Installation, monitoring, and operation of permeable reactive barriers Research of permeable

  3. Apply

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Apply Application Process Bringing together top space science students with internationally recognized researchers at Los Alamos in an educational and collaborative atmosphere. ...

  4. Hopper Installation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and a host of other scientific endeavors. 00.JPG Delivery 1.JPG Unloading 3.JPG Earthquake protection 4.JPG Installing cabinets 6.JPG Half way there 8.JPG Inspection and...

  5. Engineering report for simulated riser installation

    SciTech Connect (OSTI)

    Brevick, C.H., Westinghouse Hanford

    1996-05-09

    The simulated riser installation field tests demonstrated that new access ports (risers) can be installed safely, quickly, and economically in the concrete domes of existing underground single- shell waste storage tanks by utilizing proven rotary drilling equipment and vacuum excavation techniques. The new riser installation will seal against water intrusion, provide as table riser anchored to the tank dome, and be installed in accordance with ALARA principles. The information contained in the report will apply to actual riser installation activity in the future.

  6. Sandia Energy - Installation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Installation Home Stationary Power Energy Conversion Efficiency Solar Energy Photovoltaics Solar Market Transformation Installation InstallationTara Camacho-Lopez2015-03-20T19:23:2...

  7. Workplace Charging Installation Costs

    Broader source: Energy.gov [DOE]

    Installation costs and services vary considerably, so employers are encouraged to obtain a number of quotes before moving forward with any installation. An initial site investigation should include:

  8. HTAR Configuration and Installation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Configuration and Installation HTAR Configuration and Installation HTAR is an archival utility similar to gnu-tar that allows for the archiving and extraction of local files into and out of HPSS. Configuration Instructions This distribution has default configuration settings which will work for most environments. If you want to use the default values (recommended) you can skip to the section labeled INSTALLATION INSTRUCTIONS. In certain environments, for example if your installation is on a

  9. Installation and Acceptance Stage

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-05-21

    This chapter addresses activities required to install the software, data bases, or data that comprise the software product onto the hardware platform at sites of operation.

  10. HSI Configuration and Installation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Instructions below. In certain environments (e.g., if your installation is on a machine which has more than one network interface or has a high bandwidth network connection...

  11. HVAC Installed Performance

    Broader source: Energy.gov [DOE]

    This presentation was given at the Summer 2012 DOE Building America meeting on July 25, 2012, and addressed the question HVAC proper installation energy savings: over-promising or under-delivering?"

  12. Design and construction of liquefied petroleum gas installations (LPG)

    SciTech Connect (OSTI)

    Not Available

    1989-01-01

    This standard applies principally to both refrigerated and non-refrigerated installations that are larger in size than or closely associated with operating units, or both. The more complex problems presented by such installations require wider latitude for the designer than installations that are covered by the present National Fire Protection Association standards.

  13. Automated solar collector installation design

    DOE Patents [OSTI]

    Wayne, Gary; Frumkin, Alexander; Zaydman, Michael; Lehman, Scott; Brenner, Jules

    2014-08-26

    Embodiments may include systems and methods to create and edit a representation of a worksite, to create various data objects, to classify such objects as various types of pre-defined "features" with attendant properties and layout constraints. As part of or in addition to classification, an embodiment may include systems and methods to create, associate, and edit intrinsic and extrinsic properties to these objects. A design engine may apply of design rules to the features described above to generate one or more solar collectors installation design alternatives, including generation of on-screen and/or paper representations of the physical layout or arrangement of the one or more design alternatives.

  14. Heating equipment installation system

    DOE Patents [OSTI]

    Meuschke, Robert E.; Pomaibo, Paul P.

    1991-01-01

    A method for installing a heater unit assembly (52, 54) in a reactor pressure vessel (2) for performance of an annealing treatment on the vessel (2), the vessel (2) having a vertical axis, being open at the top, being provided at the top with a flange (6) having a horizontal surface, and being provided internally, at a location below the flange (6), with orientation elements (8) which are asymmetrical with respect to the vertical axis, by the steps of: providing an orientation fixture (10) having an upwardly extending guide member (18) and orientation elements (14, 16) and installing the orientation fixture (10) in the vessel (2) so that the orientation elements (14,16) of the orientation fixture (10) mate with the orientation elements (8) of the pressure vessel (2) in order to establish a defined position of the orientation fixture (10) in the pressure vessel (2), and so that the guide member (18) projects above the pressure vessel (2) flange (6); placing a seal ring (30) in a defined position on the pressure vessel (2) flange (6) with the aid of the guide member (18); mounting at least one vertical, upwardly extending guide stud (40) upon the seal ring (30); withdrawing the orientation fixture (10) from the pressure vessel (2); and moving the heater unit assembly (52,54) vertically downwardly into the pressure vessel (2) while guiding the heater unit assembly (52,54) along a path with the aid of the guide stud (40).

  15. Sandia Energy - Installation Energy Security

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Installation Energy Security Home Stationary Power Safety, Security & Resilience of Energy Infrastructure Grid Modernization Resilient Electric Infrastructures Military...

  16. Enhanced Control Installations.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    correctness. Title: Individual Permit, High Priority Sites, Examples of Enhanced Control Installations, Poster, Individual Permit for Storm Water, NPDES Permit No. NM0030759...

  17. CHP Installed Capacity Optimizer Software

    Energy Science and Technology Software Center (OSTI)

    2004-11-30

    The CHP Installed Capacity Optimizer is a Microsoft Excel spreadsheet application that determines the most economic amount of capacity of distributed generation and thermal utilization equipment (e.g., absorption chillers) to install for any user-defined set of load and cost data. Installing the optimum amount of capacity is critical to the life-cycle economic viability of a distributed generation/cooling heat and power (CHP) application. Using advanced optimization algorithms, the software accesses the loads, utility tariffs, equipment costs,more » etc., and provides to the user the most economic amount of system capacity to install.« less

  18. Factors Affecting PMU Installation Costs

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... throughout the industry, resulting in widespread cost and project efficiency benefits. ... support staff on all of the above. Traveling to and from the installation sites, ...

  19. Safety Culture in Nuclear Installations

    Broader source: Energy.gov [DOE]

    IAEA-TECDOC-1329 Safety Culture in Nuclear Installations, Guidance for use in the Enhancement of Safety Culture, International Atomic Energy Agency IAEA, December 2002.

  20. Strain gauge installation tool

    DOE Patents [OSTI]

    Conard, Lisa Marie

    1998-01-01

    A tool and a method for attaching a strain gauge to a test specimen by maaining alignment of, and applying pressure to, the strain gauge during the bonding of the gauge to the specimen. The tool comprises rigid and compliant pads attached to a spring-loaded clamp. The pads are shaped to conform to the specimen surface to which the gauge is to be bonded. The shape of the pads permits the tool to align itself to the specimen and to maintain alignment of the gauge to the specimen during the bond curing process. A simplified method of attaching a strain gauge is provided by use of the tool.

  1. Strain gauge installation tool

    DOE Patents [OSTI]

    Conard, L.M.

    1998-06-16

    A tool and a method are disclosed for attaching a strain gauge to a test specimen by maintaining alignment of, and applying pressure to, the strain gauge during the bonding of the gauge to the specimen. The tool comprises rigid and compliant pads attached to a spring-loaded clamp. The pads are shaped to conform to the specimen surface to which the gauge is to be bonded. The shape of the pads permits the tool to align itself to the specimen and to maintain alignment of the gauge to the specimen during the bond curing process. A simplified method of attaching a strain gauge is provided by use of the tool. 6 figs.

  2. Microhydro System Design and Installation

    Broader source: Energy.gov [DOE]

    This 1-1/2 day workshop will cover the basics of small scale hydro power with a field trip to local microhydro installation. Participants will learn about: site assessment techniques including the...

  3. Solar Installation Labor Market Analysis

    SciTech Connect (OSTI)

    Friedman, B.; Jordan, P.; Carrese, J.

    2011-12-01

    The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

  4. Net Zero Energy Installations (Presentation)

    SciTech Connect (OSTI)

    Booth, S.

    2012-05-01

    A net zero energy installation (NZEI) is one that produces as much energy from on-site renewable sources as it consumes. NZEI assessment provides a systematic approach to energy projects.

  5. Quadrennial Energy Review: Second Installment

    Broader source: Energy.gov [DOE]

    On April 21, 2015, the Quadrennial Energy Review (QER) Task Force released its first installment of the Quadrennial Energy Review report entitled, “Energy Transmission, Storage, and Distribution...

  6. Magnet Girder Assembly and Installation

    ScienceCinema (OSTI)

    None

    2013-07-17

    It takes teamwork to assemble and install magnet girders for the storage ring of the National Synchrotron Light Source II. NSLS-II is now under construction at Brookhaven Lab.

  7. New Eddy Correlation Systems Installed

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 New Eddy Correlation Systems Installed New and improved eddy correlation (ECOR) systems are being installed at the SGP CART site. ECOR instrument mentor Mikhail Pekour assembled the systems from commercially available components and added custom computer programming to operate them. The new systems will add measurements of carbon dioxide flux to the usual ECOR measurements, which include fluxes of water vapor, heat, and momentum. Pekour selected modular components that Technical Contact: James

  8. CX-013353: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Motor Silencer Installation CX(s) Applied: B1.21Date: 12/02/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  9. CX-011250: Categorical Exclusion Determination | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Determination Transforming Photovoltaic Installations Toward Dispatchable, Schedulable Energy Solutions CX(s) Applied: B3.6, B5.15 Date: 10172013 Location(s): Oregon...

  10. CX-012724: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Advanced Test Reactor (ATR) Electronic Message Board Installation CX(s) Applied: B1.7Date: 41830 Location(s): IdahoOffices(s): Nuclear Energy

  11. CX-012570: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install Elevated Fire Water Storage Tank CX(s) Applied: B2.5Date: 41862 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  12. CX-012572: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    H-Area Vehicle Barrier Installation CX(s) Applied: B1.15Date: 41862 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  13. CX-010057: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Eugene Substation Protective Relay Installation CX(s) Applied: B1.7 Date: 01/29/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

  14. CX-012637: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    LURR 20140521 - David King - Sewer Line Installation CX(s) Applied: B4.9Date: 41876 Location(s): OregonOffices(s): Bonneville Power Administration

  15. CX-010767: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    University Boulevard Water Meter Installation CX(s) Applied: B2.2 Date: 08/14/2013 Location(s): Idaho Offices(s): Nuclear Energy

  16. Categorical Exclusion Determinations: Savannah River Operations...

    Office of Environmental Management (EM)

    Savannah River Operations Office Categorical Exclusion Determinations: Savannah River ... Install Concrete Block Bins for Additional Rock Storage at MOX Batch Plant CX(s) Applied: ...

  17. CX-012808: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    LURR 20140504 Ross Substation Comcast Fiber Installation CX(s) Applied: B4.9Date: 41906 Location(s): WashingtonOffices(s): Bonneville Power Administration

  18. CX-011686: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Ross Communication Tower Fiber Installation CX(s) Applied: B4.7 Date: 01/15/2014 Location(s): Washington Offices(s): Bonneville Power Administration

  19. CX-009786: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Beck Road Substation Meter Installation CX(s) Applied: B1.7 Date: 01/07/2013 Location(s): Idaho Offices(s): Bonneville Power Administration

  20. CX-010258: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Bangladesh Meteorological Instrumentation Installation CX(s) Applied: A9 Date: 04/26/2013 Location(s): Colorado Offices(s): Golden Field Office

  1. Categorical Exclusion Determinations: B4.9 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 24, 2014 CX-012808: Categorical Exclusion Determination LURR 20140504 Ross Substation Comcast Fiber Installation CX(s) Applied: B4.9 Date: 41906 Location(s): ...

  2. CX-010763: Categorical Exclusion Determination | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CX-010763: Categorical Exclusion Determination Nevada Desert Research Institute- Photovoltaic Installation CX(s) Applied: B5.16 Date: 07172013 Location(s): Nevada Offices(s):...

  3. CX-013450: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Ellensburg Guy Wire Installation CX(s) Applied: B4.9Date: 03/06/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration

  4. CX-011237: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Lightspeed Networks Inc. Fiber Installation CX(s) Applied: B4.9 Date: 10/24/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

  5. CX-011634: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Closure Turf Installation CX(s) Applied: B6.1 Date: 08/27/2013 Location(s): Texas Offices(s): Pantex Site Office

  6. CX-012725: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Materials and Fuel Complex (MFC)-782 Fire Sprinkler Installation CX(s) Applied: B2.2Date: 41829 Location(s): IdahoOffices(s): Nuclear Energy

  7. Quadrennial Energy Review: First Installment

    Broader source: Energy.gov [DOE]

    On April 21, 2015, the Quadrennial Energy Review (QER) Task Force released its first installment of the Quadrennial Energy Review report entitled, “Energy Transmission, Storage, and Distribution Infrastructure”. The first installment of the QER examines how to modernize our nation’s energy infrastructure to promote economic competitiveness, energy security and environmental responsibility, and is focused on energy transmission, storage, and distribution (TS&D), the networks of pipelines, wires, storage, waterways, railroads, and other facilities that form the backbone of our energy system. The QER seeks to identify vulnerabilities in the system and proposes major policy recommendations and investments to replace, expand, and modernize infrastructure where appropriate.

  8. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in ...

  9. Solar, Wind, Hydropower: Home Renewable Energy Installations...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solar, Wind, Hydropower: Home Renewable Energy Installations Solar, Wind, Hydropower: Home Renewable Energy Installations April 17, 2013 - 1:44pm Addthis This Lakewood, Colorado ...

  10. Structural considerations for solar installers : an approach...

    Office of Scientific and Technical Information (OSTI)

    The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed ...

  11. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in...

  12. Solar Technologies Installations Ltd | Open Energy Information

    Open Energy Info (EERE)

    Installations Ltd Jump to: navigation, search Name: Solar Technologies Installations Ltd Place: Hampshire, United Kingdom Zip: S051 OHR Sector: Renewable Energy Product: A UK-based...

  13. Aasgard subsea installation on schedule

    SciTech Connect (OSTI)

    Perdue, J.M.

    1998-09-01

    Statoil`s Aasgard A FPSO vessel is set to sail away from the Aker Stord yard on November 22, 1998, and construction of the Aasgard B semisubmersible gas platform has begun at the Daewoo yard in Korea. While Aasgard A and Aasgard B are receiving a lot of attention on land, the Aasgard subsea installation is quietly being readied for the big day.

  14. Oklahoma Tribe to Install Solar Roof

    Broader source: Energy.gov [DOE]

    An Indian tribe in Anadarko, Oklahoma is installing solar panel roofs on two tribal government buildings.

  15. Infiniband cables installed | Argonne Leadership Computing Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Infiniband cables installed Download original image « Back to galleryItem 8

  16. LANL installs additional protective measures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lab completes additional protections LANL installs additional protective measures Work crews completed additional flood and erosion-control measures this week to reduce the environmental effects of any flash floods following the Las Conchas Fire. July 20, 2011 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma

  17. File:Install.pdf | Open Energy Information

    Open Energy Info (EERE)

    Install.pdf Jump to: navigation, search File File history File usage File:Install.pdf Size of this preview: 463 599 pixels. Other resolution: 464 600 pixels. Full resolution...

  18. Cray to Install Cascade System at NERSC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    System at NERSC Cray to Install Cascade System at NERSC June 27, 2012 by Richard Gerber Cray will install a next-generation supercomputer code-named "Cascade" and a...

  19. Carpe Diem: Install Insulated Roman Shades

    Broader source: Energy.gov [DOE]

    As I mentioned in yesterday's blog, I had insulated window quilts installed on most of my home's windows.

  20. WINDExchange: U.S. Installed Wind Capacity

    Wind Powering America (EERE)

    Education Printable Version Bookmark and Share Workforce Development Collegiate Wind Competition Wind for Schools Project School Project Locations Education & Training Programs Curricula & Teaching Materials Resources Installed Wind Capacity This page has maps of the United States that show installed wind capacity by state and its progression. This map shows the installed wind capacity in megawatts. As of June 30, 2015, 67,870 megawatts have been installed. Alaska, 62 megawatts; Hawaii,

  1. NREL Job Task Analysis: Retrofit Installer Technician

    Broader source: Energy.gov [DOE]

    A summary of job task analyses for the position of retrofit installer technician when conducting weatherization work on a residence.

  2. QER SECOND INSTALLMENT PUBLIC MEETING-AUSTIN, TEXAS | Department of

    Office of Environmental Management (EM)

    Energy AUSTIN, TEXAS QER SECOND INSTALLMENT PUBLIC MEETING-AUSTIN, TEXAS MEETING DATE AND LOCATION Monday, May, 9, 2016 Doors open: 8:00 AM; Program begins: 8:30 AM University of Texas Peter O'Donnell, Jr. Applied Computational Engineering and Sciences Building Avaya Auditorium (POB 2.302) 201 East 24th Street Austin, TX 78712 Watch the meeting live here. MEETING INFORMATION The Quadrennial Energy Review Task Force will host a public stakeholder meeting on the second installment of the

  3. Community Wind Handbook/Find an Installer | Open Energy Information

    Open Energy Info (EERE)

    * Submit Permit Applications * Find an Installer * Purchase Equipment * Plan for Maintenance Find an Installer Homeowners, ranchers, and small businesses can install wind...

  4. Quadrennial Energy Review Second Installment Electricity: Generation...

    Energy Savers [EERE]

    Quadrennial Energy Review Second Installment Electricity: Generation to End-Use ... Ernest Moniz, United States Secretary of Energy As United States Secretary of Energy, Dr. ...

  5. Hawaii Well Construction & Pump Installation Standards Webpage...

    Open Energy Info (EERE)

    Standards Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Hawaii Well Construction & Pump Installation Standards Webpage Abstract This webpage...

  6. Hawaii Well Construction & Pump Installation Standards | Open...

    Open Energy Info (EERE)

    Handbook Abstract This document provides an overview of the well construction and pump installation standards in Hawaii. Author State of Hawaii Commission on Water Resource...

  7. ADA Requirements for Workplace Charging Installation | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    individuals with disabilities. This Guidance provides best practices, special design guidelines and requirements for installing plug-in electric vehicle charging stations in ...

  8. Better Buildings Neighborhood Program Data Installed Measures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Better Buildings Neighborhood Program Data Installed Measures Building project data for 75,110 single-family homes upgraded between July 1, 2010, and September 30, 2013, are ...

  9. Install Removable Insulation on Valves and Fittings

    Broader source: Energy.gov [DOE]

    This tip sheet on installing removable insulation on valves and fittings provides how-to advice for improving steam systems using low-cost, proven practices and technologies.

  10. WPN 93-5: Recommended Installation Standards for Mobile Homes

    Broader source: Energy.gov [DOE]

    To provide technical assistance to the states on recommended installation techniques for weatherization materials installed on mobile homes.

  11. Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.

    SciTech Connect (OSTI)

    Richards, Elizabeth H.; Schindel, Kay; Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William; Harper, Alan

    2011-12-01

    Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

  12. North Shore Gas- Single Family Direct Install

    Broader source: Energy.gov [DOE]

    Owners of single-family homes, condos, townhomes and two-flats may be eligible for a free installation of new programmable thermostats, pipe insulation, showerheads, Compact Fluorescent Bulbs (CFLs...

  13. Draft Environmental Assessment: Sand Point Wind Installation...

    Energy Savers [EERE]

    ... Runway 31 departures climb via 314 bearing from the Borland (HBT) NDBDME to 1,800 feet ... installation and testing of the wind turbines when they are under normal operation. ...

  14. Structural Code Considerations for Solar Rooftop Installations.

    SciTech Connect (OSTI)

    Dwyer, Stephen F.; Dwyer, Brian P.; Sanchez, Alfred

    2014-12-01

    Residential rooftop solar panel installations are limited in part by the high cost of structural related code requirements for field installation. Permitting solar installations is difficult because there is a belief among residential permitting authorities that typical residential rooftops may be structurally inadequate to support the additional load associated with a photovoltaic (PV) solar installation. Typical engineering methods utilized to calculate stresses on a roof structure involve simplifying assumptions that render a complex non-linear structure to a basic determinate beam. This method of analysis neglects the composite action of the entire roof structure, yielding a conservative analysis based on a rafter or top chord of a truss. Consequently, the analysis can result in an overly conservative structural analysis. A literature review was conducted to gain a better understanding of the conservative nature of the regulations and codes governing residential construction and the associated structural system calculations.

  15. Install an Automatic Blowdown Control System

    SciTech Connect (OSTI)

    Not Available

    2006-01-01

    This revised ITP steam tip sheet on installing automatic blowdown controls provide how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  16. Help Your Employer Install Electric Vehicle Charging

    Broader source: Energy.gov [DOE]

    Educate your employer about the benefits of installing plug-in electric vehicle (PEV) workplace charging. Use the resources below and the Plug-in Electric Vehicle (PEV) Handbook for Workplace...

  17. Transforming PV Installations toward Dispatchable, Schedulable Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solutions | Department of Energy Transforming PV Installations toward Dispatchable, Schedulable Energy Solutions Transforming PV Installations toward Dispatchable, Schedulable Energy Solutions Advanced Energy logo.png -- This project is inactive -- Advanced Energy (AE) will address three important needs in the further deployment of photovoltaic (PV) systems: 1) demonstrating and commercializing a new anti-islanding method utilizing Phasor Measurement Units (PMUs), 2) demonstrating a set of

  18. ARM Installs Aircraft Detection Radar System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ARM Installs Aircraft Detection Radar System For improved safety in and around the ARM SGP CART site, the ARM Program recently purchased and installed an aircraft detection radar system at the central facility near Lamont, Oklahoma. The new system will enhance safety measures already in place at the central facility. The SGP CART site, especially the central facility, houses several instruments employing laser technology. These instruments are designed to be eye-safe and are not a hazard to

  19. mhtml:file://H:\CATX\APPROVED-CXS\EERE FOA 1201 - Rankine Cycle

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    . ., . . BNL-68599 PRODUCTION OF RADIOACTIVE IODINE David J. Schlyer Iodine-123 Probably the most 'widely used cyclotron produced radiohalogen is 1-123. It has gradually replaced I-13 1 as the isotope of choice for diagnostic radiopharmaceuticals containing radioiodine. It gives a much lower radiation dose to the patient and the gamma ray energy of 159 keV is ideally suited for use in a gamma camera. The gamma ray will penetrate tissue very effectively without excessive radiation dose. For this

  20. Applied combustion

    SciTech Connect (OSTI)

    1993-12-31

    From the title, the reader is led to expect a broad practical treatise on combustion and combustion devices. Remarkably, for a book of modest dimension, the author is able to deliver. The text is organized into 12 Chapters, broadly treating three major areas: combustion fundamentals -- introduction (Ch. 1), thermodynamics (Ch. 2), fluid mechanics (Ch. 7), and kinetics (Ch. 8); fuels -- coal, municipal solid waste, and other solid fuels (Ch. 4), liquid (Ch. 5) and gaseous (Ch. 6) fuels; and combustion devices -- fuel cells (Ch. 3), boilers (Ch. 4), Otto (Ch. 10), diesel (Ch. 11), and Wankel (Ch. 10) engines and gas turbines (Ch. 12). Although each topic could warrant a complete text on its own, the author addresses each of these major themes with reasonable thoroughness. Also, the book is well documented with a bibliography, references, a good index, and many helpful tables and appendices. In short, Applied Combustion does admirably fulfill the author`s goal for a wide engineering science introduction to the general subject of combustion.

  1. Foldtrack Installation in C-110 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Installation in C-110 Foldtrack Installation in C-110 Addthis Description Crews successfully installed a new and improved version of the Foldtrack into tank C-110, a single-shell tank with about 17,200 gallons of waste remaining

  2. SunShot Initiative Installs Solar Energy System | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SunShot Initiative Installs Solar Energy System SunShot Initiative Installs Solar Energy System Addthis 1 of 10 SunShot Initiative team members install a solar energy system on a ...

  3. Fluid assisted installation of electrical cable accessories

    DOE Patents [OSTI]

    Mayer, Robert W.; Silva, Frank A.

    1977-01-01

    An electrical cable accessory includes a generally tubular member of elastomeric material which is to be installed by placement over a cylindrical surface to grip the cylindrical surface, when in appropriate assembled relation therewith, with a predetermined gripping force established by dilation of the tubular member, the installation being facilitated by introducing fluid under pressure, through means provided in the tubular member, between the tubular member and the cylindrical surface, and simultaneously impeding the escape of the fluid under pressure from between the tubular member and the cylindrical surface by means adjacent one of the ends of the tubular member to cause dilation of the tubular member and establish a fluid layer between the tubular member and the cylindrical surface, thereby reducing the gripping force during installation.

  4. Development of a coiled tubing cable installation system

    SciTech Connect (OSTI)

    Newman, K.R.; Haver, N.A.; Stone, L.R.

    1995-12-31

    A system has been developed which installs and de-installs an electric wireline cable in coiled tubing (CT) while the CT is still on the reel. This cable installation system reduces the cost of a cable installation significantly compared with previous installation methods. This paper discusses the need for such a system, the theory used to develop this system, the various concepts considered, the system that was developed and test installation cases.

  5. Alternative Fuels Data Center: Installing New E85 Equipment

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Installing New E85 Equipment to someone by E-mail Share Alternative Fuels Data Center: Installing New E85 Equipment on Facebook Tweet about Alternative Fuels Data Center: Installing New E85 Equipment on Twitter Bookmark Alternative Fuels Data Center: Installing New E85 Equipment on Google Bookmark Alternative Fuels Data Center: Installing New E85 Equipment on Delicious Rank Alternative Fuels Data Center: Installing New E85 Equipment on Digg Find More places to share Alternative Fuels Data

  6. Study Guide for Photovoltaic System Installers and Sample Examination...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information Resources Study Guide for Photovoltaic System Installers and Sample Examination Questions Study Guide for Photovoltaic System Installers and Sample Examination ...

  7. Energy Secretary Chu Announces Five Million Smart Meters Installed...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Five Million Smart Meters Installed Nationwide as Part of Grid Modernization Effort Energy Secretary Chu Announces Five Million Smart Meters Installed Nationwide as Part of Grid ...

  8. Five Million Smart Meters Installed Nationwide is Just the Beginning...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Million Smart Meters Installed Nationwide is Just the Beginning of Smart Grid Progress Five Million Smart Meters Installed Nationwide is Just the Beginning of Smart Grid Progress ...

  9. Secretary Chu Announces Two Million Smart Grid Meters Installed...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Million Smart Grid Meters Installed Nationwide Secretary Chu Announces Two Million Smart Grid Meters Installed Nationwide August 31, 2010 - 12:00am Addthis Columbus, OH - At an ...

  10. Utah Underground Storage Tank Installation Permit | Open Energy...

    Open Energy Info (EERE)

    Storage Tank Installation Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: Utah Underground Storage Tank Installation Permit Form Type Application...

  11. U.S. Installation, Operation, and Performance Standards for Microturbi...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Installation, Operation, and Performance Standards for Microturbine Generator Sets, August 2000 U.S. Installation, Operation, and Performance Standards for Microturbine Generator ...

  12. Building America Expert Meeting: Achieving the Best Installed...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Achieving the Best Installed Performance from High-Efficiency Residential Gas Furnaces Building America Expert Meeting: Achieving the Best Installed Performance from High-Efficiency ...

  13. Property:Installed Capacity (MW) | Open Energy Information

    Open Energy Info (EERE)

    Installed Capacity (MW) Jump to: navigation, search Property Name Installed Capacity (MW) Property Type Number Retrieved from "http:en.openei.orgwindex.php?titleProperty:Insta...

  14. Focus Series: Maine - Residential Direct Install Program | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Maine - Residential Direct Install Program Focus Series: Maine - Residential Direct Install Program Better Buildings Neighborhood Program Focus Series: Maine - Residential Direct ...

  15. Defining the Effectiveness of UV Lamps Installed in Circulating...

    Office of Scientific and Technical Information (OSTI)

    Installed in Circulating Air Ductwork Citation Details In-Document Search Title: Defining the Effectiveness of UV Lamps Installed in Circulating Air Ductwork You are ...

  16. Defining the Effectiveness of UV Lamps Installed in Circulating...

    Office of Scientific and Technical Information (OSTI)

    Installed in Circulating Air Ductwork Citation Details In-Document Search Title: Defining the Effectiveness of UV Lamps Installed in Circulating Air Ductwork Germicidal ...

  17. Defining the Effectiveness of UV Lamps Installed in Circulating...

    Office of Scientific and Technical Information (OSTI)

    Installed in Circulating Air Ductwork Citation Details In-Document Search Title: Defining the Effectiveness of UV Lamps Installed in Circulating Air Ductwork Ultraviolet; UV; ...

  18. Floodplain Assessment for Installation of a Renewable Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Installation of a Renewable Energy Anaerobic Digester Facility Floodplain Assessment for Installation of a Renewable Energy Anaerobic Digester Facility Floodplain Assessment ...

  19. DOE-DOD Emergency Backup Power Fuel Cell Installations | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE-DOD Emergency Backup Power Fuel Cell Installations DOE-DOD Emergency Backup Power Fuel Cell Installations Ths fact sheet describes a collaboration between the departments of ...

  20. Sandia Energy - Molten Salt Test Loop Pump Installed

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Energy News Concentrating Solar Power Solar Energy Storage Systems Molten Salt Test Loop Pump Installed Previous Next Molten Salt Test Loop Pump Installed The pump was...

  1. Transforming PV Installations Toward Dispatchable, Schedulable...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PV insTallaTions Toward disPaTchable, schedulable energy soluTions MIChAEl MIllS-PrICE, SEGIS-AC ProGrAM MAnAGEr, AE SolAr EnErGy A B C N SATCON518kw1 B2+2 Cap Bank ...

  2. Electron circuits: semiconductor laser multiple use installation

    SciTech Connect (OSTI)

    Zhou, F.; Fan, J.; Weng, D.

    1983-04-01

    A light source for a multiple use installation using a same matter junction or different matter junction GaAlAs/GaAs semiconductor laser, which has the advantages of high interference resistance, long transmission distance (tens to hundreds of meters), good security, and low power consumption in addition, the controller of the light source has multiple usages of alarming, switching and counting is presented. The multiple use installation can be used in control of breaking warps and counting on roving waste machines, warping machines and silk weaving machines in the textile industry long distance speed measurement, alarming and counting in machinery, electricity and chemical industries and alarming and control of water levels in reservoirs, rivers and water towers, as well as blockade alarming and control of important divisions. This multiple use installation is composed of two parts a laser emitter and a receiving device. The former component is used to produce the laser after the receiver receives the laser, the installation completes operations of alarming, switching and counting.

  3. Experiences from the offshore installation of a composite materials firewater system

    SciTech Connect (OSTI)

    Ciaraldi, S.W.

    1993-12-31

    A prototype 300 m composite dry deluge firewater system was installed in December 1991 at the Valhall Field in the southern North Sea Norwegian offshore sector. This installation followed successful safety verification of the explosion and fire resistant design concept consisting of glass-fiber reinforced epoxy (GRE) piping components protected with a reinforced intumescent epoxy fire insulation. The installation was based primarily on the use of prefabricated GRE piping spools and fire insulation cast onto the piping or applied in the form of cast half shells. Significant experiences gained from the project are described. These experiences involve pre-engineering activities, detailed engineering, onshore fabrication, shipping, offshore hook-up, quality assurance, safety and economics. Although the overall installation was successful and the system is functioning as intended, areas of possible optimization and cost reduction for future composite firewater systems were identified. These findings are also briefly reviewed.

  4. Ceilings and Attics: Install Insulation and Provide Ventilation

    SciTech Connect (OSTI)

    2000-02-01

    This document provides guidelines for installing insulation and managing ventilation through your attic.

  5. Alternative Fuels Data Center: Installing B20 Equipment

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Fuels & Vehicles » Biodiesel Printable Version Share this resource Send a link to Alternative Fuels Data Center: Installing B20 Equipment to someone by E-mail Share Alternative Fuels Data Center: Installing B20 Equipment on Facebook Tweet about Alternative Fuels Data Center: Installing B20 Equipment on Twitter Bookmark Alternative Fuels Data Center: Installing B20 Equipment on Google Bookmark Alternative Fuels Data Center: Installing B20 Equipment on Delicious Rank Alternative Fuels Data

  6. Workplace Charging Equipment and Installation Costs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Equipment and Installation Costs Workplace Charging Equipment and Installation Costs The costs for a workplace charging program include the costs for charging equipment, installation, maintenance, and supplying electricity. Charging equipment costs depend on the type of charging station you decide to install in your workplace. Level 1 ($300-$1,500) and Level 2 ($400-$6,500) charging stations are commonly installed at workplaces. Explore how charging station equipment features affect the total

  7. CNTA_Well_Installation_Report.book

    Office of Legacy Management (LM)

    Well Installation Report for Corrective Action Unit 443, Central Nevada Test Area Nye County, Nevada Revision No.: 0 January 2006 Approved for public release; further dissemination unlimited. DOE/NV--1102 Uncontrolled When Printed Available for public sale, in paper, from: U.S. Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 Phone: 800.553.6847 Fax: 703.605.6900 Email: orders@ntis.gov Online ordering: http://www.ntis.gov/ordering.htm

  8. Extra-Territorial Siting of Nuclear Installations

    SciTech Connect (OSTI)

    Shea, Thomas E.; Morris, Frederic A.

    2009-10-07

    Arrangements might be created for siting nuclear installations on land ceded by a host State for administration by an international or multinational organization. Such arrangements might prove useful in terms of resolving suspicions of proliferation in troubled areas of the world, or as a means to introduce nuclear activities into areas where political, financial or technical capabilities might otherwise make such activities unsound, or as a means to enable global solutions to be instituted for major nuclear concerns (e.g., spent fuel management). The paper examines practical matters associated with the legal and programmatic aspects of siting nuclear installations, including diplomatic/political frameworks, engaging competent industrial bodies, protection against seizure, regulation to ensure safety and security, waste management, and conditions related to the dissolution of the extra-territorial provisions as may be agreed as the host State(s) achieve the capabilities to own and operate the installations. The paper considers the potential for using such a mechanism across the spectrum of nuclear power activities, from mining to geological repositories for nuclear waste. The paper considers the non-proliferation dimensions associated with such arrangements, and the pros and cons affecting potential host States, technology vendor States, regional neighbors and the international community. It considers in brief potential applications in several locations today.

  9. CX-010378: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of a Prefabricated 130 Square Feet Building Adjacent to Building 67 CX(s) Applied: B6.4 Date: 03/23/2011 Location(s): California Offices(s): Berkeley Site Office

  10. CX-011698: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Solar, Install, Mount, Production, Labor, Equipment (SIMPLE BoS) CX(s) Applied: A9, B3.6, B5.16 Date: 01/08/2014 Location(s): Georgia Offices(s): Golden Field Office

  11. CX-012823: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Rocky Reach-Maple Valley #1 Line Bridge Installation CX(s) Applied: B1.3Date: 41873 Location(s): WashingtonOffices(s): Bonneville Power Administration

  12. CX-012322: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Storm Shelter Installation and Related Activities at the Weldon Spring, Missouri, Site CX(s) Applied: B1.15, B3.1 Date: 06/11/2014 Location(s): Missouri Offices(s): Legacy Management

  13. CX-012726: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation and Redevelopment of Groundwater Monitoring Wells at the Salmon, Mississippi Site CX(s) Applied: B3.1Date: 08/26/2014Location(s): MississippiOffices(s): Legacy Management

  14. CX-011057: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Ohio Advanced Transportation Partnership, EVSE Installation CX(s) Applied: B5.23 Date: 08/29/2013 Location(s): Ohio Offices(s): National Energy Technology Laboratory

  15. CX-012610: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of a Concrete Pad East of Building 241-149H CX(s) Applied: B1.15Date: 41807 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  16. CX-012568: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of H-Canyon 294-1H Process Air Supply Tunnel Manway Building CX(s) Applied: B1.15Date: 41863 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  17. CX-008171: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Install Extension of the Underground Natural Gas Line From Its Current Termination Point CX(s) Applied: B5.5 Date: 03/13/2012 Location(s): New York Offices(s): Brookhaven Site Office

  18. CX-012162: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install One Power Pole and Three Anchors Northwest of 704-1N CX(s) Applied: B1.3 Date: 04/29/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office

  19. CX-009509: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Power Monitoring, Communication and Control Upgrade at Bryan Mound Degas Plant (Install) CX(s) Applied: B1.7 Date: 10/31/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office

  20. CX-008650: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install a New Roof, Building 735-A CX(s) Applied: B1.3 Date: 05/21/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

  1. CX-009063: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of Roofing System on L Area Complex Building, Sections +91 and +148 CX(s) Applied: B1.3 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

  2. CX-007775: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Installation or Relocation of Machinery and Equipment CX(s) Applied: B1.31 Date: 01/13/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office

  3. CX-012247: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of Solar Photovoltaic Systems CX(s) Applied: A9, B5.16 Date: 06/18/2014 Location(s): Wisconsin, Wisconsin Offices(s): Golden Field Office

  4. CX-013458: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Test Reactor Area (TRA)-609 Switchgear Replacement, Rollup Door Installation, and Diesel Removal CX(s) Applied: B1.31Date: 03/09/2015 Location(s): IdahoOffices(s): Nuclear Energy

  5. CX-008252: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Central Facilities Area (CFA) Shoot House Panel Installation CX(s) Applied: B2.1 Date: 03/21/2012 Location(s): Idaho Offices(s): Nuclear Energy

  6. CX-011245: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Dixon Substation Fiber Optic Cable Installation CX(s) Applied: B4.7 Date: 09/24/2013 Location(s): Montana Offices(s): Bonneville Power Administration

  7. CX-010686: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Cheyenne Substation KV2A 115-kilovolt Tie Line Installation CX(s) Applied: B4.6 Date: 07/02/2013 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  8. CX-008792: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Alliance Substation Communication Building Installation Box Butte County, Nebraska CX(s) Applied: B4.6 Date: 08/28/2011 Location(s): Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region

  9. Categorical Exclusion Determinations: B5.2 | Department of Energy

    Energy Savers [EERE]

    B5.2: Modifications to pumps and piping Modifications to existing pump and piping ... Determination Bryan Mound Brine Disposal Pump Replacement (Install) CX(s) Applied: B5.2 ...

  10. CX-010023: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Installing Vent/Drain on Inlet Headers of 292-H Recycle Vessel Vent Fans CX(s) Applied: B2.5 Date: 01/28/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

  11. CX-013596: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install Chain Fence Around Concrete Pad Near 717-F CX(s) Applied: B1.11Date: 03/18/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office

  12. CX-012381: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of a High Flux Thermal Neutron Source (HFTNS) CX(s) Applied: B2.5 Date: 05/21/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office

  13. CX-009397: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Idaho Falls Power - Willow Creek Building Conduit Installation CX(s) Applied: B4.7 Date: 10/16/2012 Location(s): Idaho Offices(s): Nuclear Energy

  14. CX-013429: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of Emergency Eyewash/Shower Station in Room B6 of the Radiochemistry Laboratory CX(s) Applied: B2.3Date: 02/17/2015 Location(s): IdahoOffices(s): Idaho Operations Office

  15. CX-012048: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Saltstone Facility Groundwater Investigation and Well Installation CX(s) Applied: B3.1 Date: 03/27/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office

  16. CX-009066: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Characterization of Downgradient Volatile Organic Compounds Plume and Installation of Monitoring Well CX(s) Applied: B3.1 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

  17. CX-012047: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Waste Tank 15H Riser 3-Foot-6-Inch Radar Level Detection System Installation CX(s) Applied: B2.2 Date: 03/31/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office

  18. CX-010098: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Phoenix to Lone Butte 230 Kilovolt Transmission Line, Bird Diverter Installation CX(s) Applied: B1.3 Date: 04/08/2013 Location(s): CX: none Offices(s): Western Area Power Administration-Desert Southwest Region

  19. CX-012565: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of Elevated Fire Water Storage Tank (geotechnical survey) CX(s) Applied: B2.5Date: 41865 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  20. CX-013762: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation and Operation of Facility for Laboratory Reconnection Experiments CX(s) Applied: B3.6Date: 05/28/2015 Location(s): New JerseyOffices(s): Princeton Site Office

  1. CX-007463: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Ohio Advanced Transportation Partnership/City of Columbus Electric Vehicle Charging Equipment Installation CX(s) Applied: B5.23 Date: 12/20/2011 Location(s): Ohio Offices(s): National Energy Technology Laboratory

  2. CX-013652: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Paul Substation 500-Kilovolt Reactor Installation CX(s) Applied: B4.11Date: 04/07/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration

  3. CX-008809: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Wind Energy Installations- Wind Turbine Project (ASO-CX-293) CX(s) Applied: B5.18 Date: 05/22/2012 Location(s): Illinois Offices(s): Argonne Site Office

  4. CX-010092: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Land Mobile Radio - Bi Directional Amplifier (BDA) Installation CX(s) Applied: B1.7 Date: 03/21/2013 Location(s): Idaho Offices(s): Nuclear Energy

  5. CX-012242: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    City of Las Vegas Solar Installations CX(s) Applied: B1.15, B5.16 Date: 06/13/2014 Location(s): Nevada Offices(s): Golden Field Office

  6. CX-012734: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Bouse Hills Pumping Plant to Harcuvar 115 Kilovolt Transmission Line, Inset Structure Installation CX(s) Applied: B4.6Date: 41878 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region

  7. CX-008009: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Safety and Security Component Installation and Alteration CX(s) Applied: B1.11, B2.2 Date: 11/28/2011 Location(s): Washington Offices(s): Science, Pacific Northwest Site Office

  8. CX-007875: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Ambler Boiler House Geothermal Wells, Cool Roof and Photovoltaic installation CX(s) Applied: B5.1, B5.16, B5.19 Date: No date. Location(s): Pennsylvania Offices(s): Golden Field Office

  9. CX-013665: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Lease for Monopole Communication Cell Tower Installation and Operation CX(s) Applied: B1.19, B1.24Date: 05/08/2015 Location(s): CaliforniaOffices(s): Lawrence Livermore Site Office

  10. CX-010409: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of Cattle Guard at Western Area power Administration's Oracle Electrical Substation CX(s) Applied: B1.11 Date: 05/09/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  11. CX-012385: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Install Receptacles for Rooms 614 and 621 CX(s) Applied: B1.3 Date: 05/15/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office

  12. CX-012170: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Install Condensate Release Valves on 108-1K Compressed Air System CX(s) Applied: B1.3 Date: 04/16/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office

  13. CX-012386: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    H-Area Vehicle Barrier Installation CX(s) Applied: B1.15 Date: 05/14/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office

  14. CX-008826: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Remanufacture, Transport, and Install BHTX-29 Transformer CX(s) Applied: B1.3 Date: 07/17/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office

  15. CX-009042: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Relocate and Install Restroom Trailer to Savannah River National Laboratory Technical Area CX(s) Applied: B1.22 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

  16. CX-007654: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install Formed Core Sampler in Saltstone Disposal Facility Vault 2 CX(s) Applied: B6.3 Date: 12/09/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office

  17. CX-100193 Categorical Exclusion Determination | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Exclusion Determination CX-100193 Categorical Exclusion Determination Installation of Solar Panels at Municipal Owned Facilities Award Number: DE-EE0003195 CX(s) Applied: B5.1...

  18. CX-012071: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Archer Substation Microwave Building Fiber Optic Installation CX(s) Applied: B4.7 Date: 04/29/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  19. CX-011340: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install One (1) Universal Wiring Drop on West End Wall in the 704-L Cafeteria CX(s) Applied: B1.3 Date: 09/19/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

  20. CX-011339: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install Blinds in 704-L Cafeteria CX(s) Applied: B1.3 Date: 09/19/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

  1. CX-013675: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Materials and Fuels Complex MH50 Fiber Optic Installation Project CX(s) Applied: B4.7Date: 05/19/2015 Location(s): IdahoOffices(s): Idaho Operations Office

  2. CX-011375: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Idaho National Laboratory Road Sign Installation/Maintenance CX(s) Applied: B1.32 Date: 09/27/2013 Location(s): Idaho Offices(s): Idaho Operations Office

  3. CX-008678: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Hot Springs Substation Gravity Drain Install CX(s) Applied: B4.6 Date: 07/19/2012 Location(s): Montana Offices(s): Bonneville Power Administration

  4. CX-009065: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of Sentinel Wells ASB011B/011C for A-2 Air Stripper Shutdown CX(s) Applied: B3.1 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

  5. CX-010311: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Tank 7 Center Riser Install/Remove Temporary Isolation Valve V-8 CX(s) Applied: B1.3 Date: 04/26/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

  6. CX-008759: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Information Operations & Research Center (IORC) Room E-6 Air Conditioner Unit Installation CX(s) Applied: B1.4 Date: 05/09/2012 Location(s): Idaho Offices(s): Idaho Operations Office

  7. CX-010878: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Replace Big Hill Circuit Breakers OCB-4009, 4010, and 4011 (install) CX(s) Applied: B1.3 Date: 08/08/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office

  8. CX-013359: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Phoenix Service Center, Grant of Access for Fiber Optic Cable Installation CX(s) Applied: A1Date: 01/16/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region

  9. CX-010167: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install High Frequency Antennas at Bonneville Power Administration Maintenance Headquarters CX(s) Applied: B1.19 Date: 03/21/2013 Location(s): Oregon, Washington, Washington Offices(s): Bonneville Power Administration

  10. CX-012171: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    735-11A French Drain Piping Installation CX(s) Applied: B1.3 Date: 04/16/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office

  11. CX-009714: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install Temperature Monitoring on Big Hill 36 inch Crude Oil Pipeline CX(s) Applied: B5.2 Date: 11/26/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office

  12. CX-010465: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Biofuel Retail Availability Improvement Network - Biodiesel Infrastructure Installation CX(s) Applied: B1.15, B5.1, B5.22 Date: 06/06/2013 Location(s): Wisconsin Offices(s): National Energy Technology Laboratory

  13. CX-012571: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Installation of H-Canyon 294-1H Process Air Supply Tunnel Manway Building CX(s) Applied: B1.15Date: 41862 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  14. CX-012569: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of H-Canyon 294-1H Process Air Supply Tunnel Manway Building CX(s) Applied: B1.15Date: 41863 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  15. CX-011342: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of Manway to H-Canyon Exhaust Tunnel CX(s) Applied: B2.5 Date: 09/19/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

  16. CX-008688: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of equipment at Wahkiakum Public Utility Districts Cathlamet Substation CX(s) Applied: B4.6 Date: 07/02/2011 Location(s): Washington Offices(s): Bonneville Power Administration

  17. CX-009843: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of Retail Biofuel Infrastructure Supporting I-75 Green Corridor Project CX(s) Applied: A1, B5.22 Date: 01/30/2013 Location(s): Florida Offices(s): National Energy Technology Laboratory

  18. CX-008306: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of Retail Biofuel Infrastructure Supporting I-75 Green Corridor Project CX(s) Applied: A1, B5.22 Date: 04/25/2012 Location(s): Georgia Offices(s): National Energy Technology Laboratory

  19. CX-009335: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    E85 (Ethanol) Retail Fueling Infrastructure Installation CX(s) Applied: B5.22 Date: 09/24/2012 Location(s): Florida Offices(s): National Energy Technology Laboratory

  20. CX-008284: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    E85 (Ethanol) Retail Fueling Infrastructure Installation CX(s) Applied: B5.22 Date: 05/01/2012 Location(s): Florida Offices(s): National Energy Technology Laboratory

  1. CX-008315: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of Retail Biofuel Infrastructure Supporting I-75 Green Corridor Project CX(s) Applied: A1, B5.22 Date: 04/18/2012 Location(s): Georgia Offices(s): National Energy Technology Laboratory

  2. CX-004348: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    State Energy Program Residential Ground Source Heat Pump Installations (6) CX(s) Applied: B5.1 Date: 10/27/2010 Location(s): Prior Lake, MinnesotaOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office

  3. CX-011240: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Echo Lake Substation Isolation Disconnect Switch Installation CX(s) Applied: B4.6 Date: 09/30/2013 Location(s): Washington Offices(s): Bonneville Power Administration

  4. CX-011833: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Fiber Installation at Snohomish, SnoKing and Murray Substations CX(s) Applied: B4.7 Date: 01/27/2014 Location(s): Washington Offices(s): Bonneville Power Administration

  5. CX-013512: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install New 773-A CHEX HEPA Filter Fluid Seal Housings CX(s) Applied: B2.3Date: 02/05/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  6. CX-013564: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of Five New Wells for Silver Chloride Injection CX(s) Applied: B3.1Date: 04/15/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  7. CX-011309: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Biofuels Retail Availability Improvement Network - Biodiesel Infrastructure Installation CX(s) Applied: B1.15, B1.23, B5.22 Date: 10/08/2013 Location(s): Wisconsin Offices(s): National Energy Technology Laboratory

  8. CX-011322: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Biofuels Retail Availability Improvement Network - E85 Infrastructure Installation CX(s) Applied: B5.22 Date: 10/01/2013 Location(s): Wisconsin Offices(s): National Energy Technology Laboratory

  9. CX-011311: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Biofuels Retail Availability Improvement Network - E85 Infrastructure Installation CX(s) Applied: B5.22 Date: 10/07/2013 Location(s): Wisconsin Offices(s): National Energy Technology Laboratory

  10. CX-011310: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Biofuels Retail Availability Improvement Network - E85 Infrastructure Installation CX(s) Applied: B5.22 Date: 10/07/2013 Location(s): Wisconsin Offices(s): National Energy Technology Laboratory

  11. CX-011323: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Biofuels Retail Availability Improvement Network - E85 Infrastructure Installation CX(s) Applied: B5.22 Date: 10/01/2013 Location(s): Wisconsin Offices(s): National Energy Technology Laboratory

  12. CX-011692: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Revenue Meter Installation at Wind River Biomass Facility CX(s) Applied: B1.7 Date: 12/30/2013 Location(s): Washington Offices(s): Bonneville Power Administration

  13. CX-012363: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Asarco and Troy Substations Grounding Mat Installations CX(s) Applied: B4.6 Date: 05/27/2014 Location(s): Montana Offices(s): Bonneville Power Administration

  14. CX-008725: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    High Frequency Sounder - Permanent Installation at Water Reactor Research Test Facility CX(s) Applied: B1.19 Date: 07/11/2012 Location(s): Idaho Offices(s): Idaho Operations Office

  15. CX-012597: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of Portable Executive Restroom Trailer - S-Area CX(s) Applied: B1.15Date: 41827 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  16. CX-009395: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Central Facilities Area (CFA)-696 Gasoline Tank Installation CX(s) Applied: B2.5 Date: 10/18/2012 Location(s): Idaho Offices(s): Nuclear Energy

  17. CX-011341: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install Nitrogen Analyzer in 772-F, Lab 175, Glovebox #1 CX(s) Applied: B3.6 Date: 09/19/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

  18. CX-012703: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    High-Efficiency Particulate Air (HEPA) Filter Installation in the Dry Transfer Cubicle Ventilation System CX(s) Applied: B2.5Date: 41870 Location(s): IdahoOffices(s): Nuclear Energy

  19. CX-012202: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Advanced Test Reactor (ATR) Complex Camera Tower Installation CX(s) Applied: B2.2 Date: 05/22/2014 Location(s): Idaho Offices(s): Nuclear Energy

  20. CX-007963: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install a New Colorimeter on the NK-1/3 Raffinate Line CX(s) Applied: B2.2 Date: 02/09/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

  1. CX-008317: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Ohio Advanced Transportation Partnership - North Coast Nissan Electric Vehicle Supply Equipment Installation CX(s) Applied: B5.23 Date: 04/18/2012 Location(s): Ohio Offices(s): National Energy Technology Laboratory

  2. CX-012345: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Collbran Substation Conduit Installation and Breaker Replacement, Mesa County, Colorado CX(s) Applied: B4.6 Date: 06/03/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  3. CX-012401: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Equipment Installations at Multiple Substations and Radio Facilities CX(s) Applied: B1.7 Date: 07/14/2014 Location(s): Washington, Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration

  4. CX-012067: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Installation of New 208 Voltage Alternating Current Electrical Service for 707-C CX(s) Applied: B1.3 Date: 03/05/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office

  5. CX-009687: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Washington River Protection Solutions LLC - Installation or Relocation of Machinery and Equipment CX(s) Applied: B1.31 Date: 12/14/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office

  6. CX-010317: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of Downcomer in Tank 15 Riser-1 for Liquid Additions for Rewetting Activities CX(s) Applied: B1.31 Date: 04/22/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

  7. CX-006724: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Whispered Relocation and Installation to 65-S-10.CX(s) Applied: B1.31, B3.11Date: 03/19/2010Location(s): Casper, WyomingOffice(s): RMOTC

  8. CX-011685: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Lightspeed Network's Fiber Installation near Pilot Butte Substation CX(s) Applied: B4.7 Date: 01/15/2014 Location(s): Oregon Offices(s): Bonneville Power Administration

  9. CX-004289: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    University of Louisiana Lafayette Solar Thermal Power Plant Installation #2CX(s) Applied: B5.1Date: 10/20/2010Location(s): Crowley, LouisianaOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office

  10. CX-011723: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Happy Jack 230 Kilovolt Substation Fiber Optic Installation in Laramie County, Wyoming CX(s) Applied: B4.7 Date: 12/31/2013 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  11. CX-010449: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Biofuel Retail Availability Improvement Network - Biodiesel Infrastructure Installation CX(s) Applied: B5.22 Date: 06/17/2013 Location(s): Wisconsin Offices(s): National Energy Technology Laboratory

  12. CX-011854: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Glen Canyon Substation 345 Kilovolt - Sulfur Hexafluoride and Concrete Pad Installation CX(s) Applied: B4.6 Date: 02/06/2014 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  13. CX-007651: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install Additional Expanded Basin Storage Racks CX(s) Applied: B1.31 Date: 12/15/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office

  14. CX-010138: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Installation of Power Rack in Blast Resistant Enclosures (BREs) 3 Through 8 CX(s) Applied: B2.1 Date: 03/07/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

  15. CX-012297: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Wisconsin Biofuels Retail Availability Improvement Network (BRAIN) - E85 Station Installation CX(s) Applied: B5.22 Date: 06/03/2014 Location(s): Wisconsin Offices(s): National Energy Technology Laboratory

  16. CX-013361: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Medicine Bow Substation Control Building Installation Project (Amended) Carbon County, Wyoming CX(s) Applied: B4.11Date: 01/05/2015 Location(s): WyomingOffices(s): Western Area Power Administration-Rocky Mountain Region

  17. CX-012193: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Slatt Substation Meter and Communication Equipment Installation CX(s) Applied: B1.7 Date: 05/05/2014 Location(s): Oregon Offices(s): Bonneville Power Administration

  18. CX-008978: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Parking Garage Gutter Replacement and Installation of Roof Ice Melt System CX(s) Applied: B2.3, B2.5 Date: 08/01/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory

  19. CX-012687: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Energy Systems Laboratory Process Demonstration Unit Pellet Mill Exhaust Stack Installation CX(s) Applied: B1.31Date: 41877 Location(s): IdahoOffices(s): Nuclear Energy

  20. CX-012735: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Davis Dam Maintenance Building Installation at the old Davis Dam 69 Kilovolt West Switchyard CX(s) Applied: B4.11Date: 41820 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region

  1. CX-011223: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Bryan Mound Brine Disposal Pump Replacement (Install) CX(s) Applied: B5.2 Date: 10/28/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office

  2. CX-010504: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of Additional Wind Turbine and Tower at NWTC Site 3.2 CX(s) Applied: B5.18 Date: 06/03/2013 Location(s): Colorado Offices(s): Golden Field Office

  3. CX-010450: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Biofuel Retail Availability Improvement Network - Biodiesel Infrastructure Installation CX(s) Applied: B5.22 Date: 06/17/2013 Location(s): Wisconsin Offices(s): National Energy Technology Laboratory

  4. Categorical Exclusion Determinations: West Virginia | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 2, 2014 CX-012402: Categorical Exclusion Determination B-33 Roof Replacement and Fall Protection System Installation CX(s) Applied: B1.3, B2.2, B2.3 Date: 41884 ...

  5. CX-012338: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Amargosa Substation (Conduit and Storage Pad Installation) CX(s) Applied: B1.3 Date: 06/03/2014 Location(s): Nevada Offices(s): Western Area Power Administration-Desert Southwest Region

  6. CX-007413: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Transforming Photovoltaic Installations Toward Discpatchable, Schedulable Energy Solutions CX(s) Applied: A9, B3.6 Date: 12/14/2011 Location(s): Oregon Offices(s): Golden Field Office

  7. CX-009579: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Wind Turbine Installation for Town of Drummond CX(s) Applied: B5.18 Date: 12/19/2012 Location(s): Oklahoma Offices(s): Golden Field Office

  8. CX-010313: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Additional Characterization and Well Installations at the M-Area Hazardous Waste Management Facility CX(s) Applied: B3.1 Date: 04/25/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

  9. CX-012593: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Western Sector Characterization Soil Borings and Groundwater Monitoring Well Installation, Phase III CX(s) Applied: B3.1Date: 41829 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  10. CX-007935: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Ohio Advanced Transportation Partnership - Installation of One Electric Vehicle Supply Equipment Unit at Mayers Electric Company CX(s) Applied: B5.23 Date: 02/22/2012 Location(s): Ohio Offices(s): National Energy Technology Laboratory

  11. CX-009409: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Gering-Gering Valley 34.5 Kilovolt Transmission Line Underground Installation CX(s) Applied: B4.13 Date: 10/02/2012 Location(s): Nebraska Offices(s): Western Area Power Administration

  12. CX-012320: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Irradiated Materials Characterization Laboratory (IMCL) Equipment Installation Project CX(s) Applied: B1.31 Date: 05/21/2014 Location(s): Idaho Offices(s): Nuclear Energy

  13. CX-009429: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Solar, Install, Mount, Production, Labor, Equipment CX(s) Applied: B5.15 Date: 10/15/2012 Location(s): Georgia Offices(s): Golden Field Office

  14. CX-012232: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Swan Valley-Teton Overhead Fiber Line Install CX(s) Applied: B4.6 Date: 06/02/2014 Location(s): Idaho Offices(s): Bonneville Power Administration

  15. CX-008304: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of Retail Biofuel Infrastructure Supporting I-75 Green Corridor Project CX(s) Applied: A1, B5.22 Date: 04/25/2012 Location(s): Michigan Offices(s): National Energy Technology Laboratory

  16. Categorical Exclusion Determinations: B1.22 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Medicine Bow Substation Control Building Installation Project Carbon County, Wyoming CX(s) Applied: B1.22, B1.23 Date: 41857 Location(s): Wyoming Offices(s): Western Area Power ...

  17. Categorical Exclusion Determinations: Wyoming | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Medicine Bow Substation Control Building Installation Project (Amended) Carbon County, Wyoming CX(s) Applied: B4.11 Date: 01052015 Location(s): Wyoming Offices(s): Western Area ...

  18. CX-012767: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Medicine Bow Substation Control Building Installation Project Carbon County, Wyoming CX(s) Applied: B1.22, B1.23Date: 41857 Location(s): WyomingOffices(s): Western Area Power Administration-Rocky Mountain Region

  19. CX-008285: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    E85 (Ethanol) Retail Fueling Infrastructure Installation CX(s) Applied: B5.22 Date: 05/01/2012 Location(s): Florida Offices(s): National Energy Technology Laboratory

  20. CX-008011: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install EMSL Super-Computer Power Infrastructure CX(s) Applied: B1.7 Date: 06/30/2011 Location(s): Washington Offices(s): Science, Pacific Northwest Site Office

  1. CX-009610: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Communication Line Installation Between Manhole F-39 and Building 221-12F CX(s) Applied: B1.7 Date: 11/27/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

  2. CX-012001: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Meter Installation at Fossil Lake Solar Project CX(s) Applied: B1.7 Date: 04/24/2014 Location(s): Oregon Offices(s): Bonneville Power Administration

  3. CX-007996: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Rocky Reach-Maple Valley #1 Temporary Bridge Installation CX(s) Applied: B1.3 Date: 02/07/2012 Location(s): Washington Offices(s): Bonneville Power Administration

  4. Drum ring removal/installation tool

    DOE Patents [OSTI]

    Andrade, William Andrew (Livermore, CA)

    2006-11-14

    A handheld tool, or a pair of such tools, such as for use in removing/installing a bolt-type clamping ring on a container barrel/drum, where the clamping ring has a pair of clamping ends each with a throughbore. Each tool has an elongated handle and an elongated lever arm transversely connected to one end of the handle. The lever arm is capable of being inserted into the throughbore of a selected clamping end and leveraged with the handle to exert a first moment on the selected clamping end. Each tool also has a second lever arm, such as a socket with an open-ended slot, which is suspended alongside the first lever arm. The second lever arm is capable of engaging the selected clamping end and being leveraged with the handle to exert a second moment which is orthogonal to the first moment. In this manner, the first and second moments operate to hold the selected clamping end fixed relative to the tool so that the selected clamping end may be controlled with the handle. The pair of clamping ends may also be simultaneously and independently controlled with the use of two handles/tools so as to contort the geometry of the drum clamping ring and enable its removal/installation.

  5. Pasadena Water and Power- Solar Power Installation Rebate

    Broader source: Energy.gov [DOE]

    Pasadena Water & Power (PWP) offers its electric customers a rebate for photovoltaic (PV) installations, with a goal of helping to fund the installation of 14 megawatts (MW) of solar power by...

  6. Savannah River Site Liquid-Waste Contractor Installs New Cost...

    Office of Environmental Management (EM)

    Liquid-Waste Contractor Installs New Cost-Saving Pump Design Savannah River Site Liquid-Waste Contractor Installs New Cost-Saving Pump Design October 29, 2015 - 12:05pm Addthis New ...

  7. Energy Saving "Cool Roofs" Installed at Y-12 | National Nuclear...

    National Nuclear Security Administration (NNSA)

    Energy Saving "Cool Roofs" Installed at Y-12 October 17, 2012 The Y-12 National Security Complex has taken additional steps to reduce its energy costs by installing almost 100,000 ...

  8. EM, County Install Sewer Line for Development | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EM, County Install Sewer Line for Development EM, County Install Sewer Line for Development April 29, 2014 - 3:53pm Addthis The Pike County Commissioners recently toured the ...

  9. Energy Department Launches SunShot Prize Competition to Install...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SunShot Prize Competition to Install Solar Energy Systems at a Fraction of Today's Price Energy Department Launches SunShot Prize Competition to Install Solar Energy Systems at a ...

  10. Install an Automatic Blowdown-Control System | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    an Automatic Blowdown-Control System Install an Automatic Blowdown-Control System This steam tip sheet on installing automatic blowdown controls provide how-to advice for improving ...

  11. Quadrennial Energy Review: First Installment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review: First Installment Quadrennial Energy Review: First Installment QUADRENNIAL ENERGY REVIEW FIRST INSTALLMENT: TRANSFORMING U.S. ENERGY INFRASTRUCTURES IN A TIME OF RAPID CHANGE PDF icon Quadrennial Energy Review: First Installment (Full Report) PDF icon Quadrennial Energy Review Summary for Policymakers PDF icon Chapter I: Introduction PDF icon Chapter II: Increasing the Resilience, Reliability, Safety, and Asset Security of TS&D Infrastructure PDF icon Chapter III: Modernizing the

  12. Study Guide for Photovoltaic System Installers and Sample Examination

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Questions | Department of Energy Information Resources » Study Guide for Photovoltaic System Installers and Sample Examination Questions Study Guide for Photovoltaic System Installers and Sample Examination Questions This study guide presents some of the basic cognitive material that individuals who install and maintain PV systems should understand. This information is intended primarily as a study guide to help better prepare for the NABCEP PV installer examination but does not provide all

  13. NREL Job Task Analysis: Retrofit Installer Technician (Revised)

    SciTech Connect (OSTI)

    Kurnik, C.; Woodley, C.

    2012-04-01

    A summary of job task analyses for the position of retrofit installer technician when conducting weatherization work on a residence.

  14. Combined Heat And Power Installation Market Analysis | OpenEI...

    Open Energy Info (EERE)

    Combined Heat And Power Installation Market Analysis Home There are currently no posts in this category. Syndicate...

  15. Combined Heat And Power Installation Market Forecast | OpenEI...

    Open Energy Info (EERE)

    Combined Heat And Power Installation Market Forecast Home There are currently no posts in this category. Syndicate...

  16. Choosing and Installing Geothermal Heat Pumps | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Choosing and Installing Geothermal Heat Pumps Choosing and Installing Geothermal Heat Pumps These geothermal heating and cooling units installed in the basement of a new home are tied to a complex array of underground coils to keep indoor temperatures comfortable. | Photo courtesy of ©iStockphoto/BanksPhotos These geothermal heating and cooling units installed in the basement of a new home are tied to a complex array of underground coils to keep indoor temperatures comfortable. | Photo

  17. Installing and Maintaining a Home Solar Electric System | Department of

    Energy Savers [EERE]

    Energy Installing and Maintaining a Home Solar Electric System Installing and Maintaining a Home Solar Electric System When choosing a contractor, ask about their work record, experience, and licenses, and get more than one bid for the installation of your PV system. | Photo courtesy of Dennis Schroeder, NREL. When choosing a contractor, ask about their work record, experience, and licenses, and get more than one bid for the installation of your PV system. | Photo courtesy of Dennis

  18. NREL Job Task Analysis: Retrofit Installer Technician (Revised)

    Broader source: Energy.gov [DOE]

    A summary of job task analyses for the position of retrofit installer technician when conducting weatherization work on a residence.

  19. Installation of Cool Roofs on Department of Energy Buildings | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Installation of Cool Roofs on Department of Energy Buildings Installation of Cool Roofs on Department of Energy Buildings PDF icon 2010.06.01 S-1 memo, Installation of Cool Roofs on DOE Buildings.pdf More Documents & Publications Guidelines for Selecting Cool Roofs CX-002735: Categorical Exclusion Determination Impact of Solar PV Laminate Membrane Systems on Roofs

  20. Case studies of six high priority DOD installations

    SciTech Connect (OSTI)

    1994-11-01

    This is a supplement to the report entitled Environmental Cleanup: Too Many High Priority Sites Impede DOD`s Program. It provides six installation case studies addressing issues including the status of the restoration program, the cost of cleanup to date and projected costs, the cleanup options considered, the option selected, expected completion, and the applicable cleanup standards. The case studies also provide installation specific information on reasons installation was listed on the NPL, the regulatory process, cooperation between the installation and the regulatory agencies, staffing at the installations and the regulatory agencies, and the process for funding the cleanup.

  1. CFPL installs products pipeline with directional drilling

    SciTech Connect (OSTI)

    1996-01-01

    Central Florida Pipeline Company (CFPL), a subsidiary of GATX Terminals Corp., Tampa, FL, has used directional drilling under seven water bodies in Hillsborough, Polk and Osceola Counties in constructing its new pipeline from Tampa to Orlando. Primary reason for using directional drilling is to protect the environment by minimizing water turbidity while the 16-inch diameter, 109-mile refined petroleum products pipeline is being installed. Total cost of the project is pegged at $68.5 million. Directional drilling enabled the pipe to be placed about 20 feet below the bottom of: The Alafia River in Riverview with 999 feet drilled; Port Sutton Channel near the Port of Tampa with 2,756 feet drilled; Reedy Creek Swamp at the intersection of Interstate 4 and Highway 192 which had 1,111 feet drilled; Wetland {number_sign}70 southwest of Lake Wales with 1,575 feet drilled; Peace River south of Bartow had 2,470 feet drilled; Bonnet Creek west of Kissimmee had 693 feet drilled. Shingle Creek near the borders of Osceola and Orange Counties with 1,700 feet drilled. This paper reviews the design plans for construction and the emergency response plans should a rupture occur in the line.

  2. Gasket and snap ring installation tool

    DOE Patents [OSTI]

    Southerland, Jr., James M.; Barringer, Jr., Curtis N.

    1994-01-01

    A tool for installing a gasket and a snap ring including a shaft, a first plate attached to the forward end of the shaft, a second plate slidably carried by the shaft, a spring disposed about the shaft between the first and second plates, and a sleeve that is free to slide over the shaft and engage the second plate. The first plate has a loading surface with a loading groove for receiving a snap ring and a shoulder for holding a gasket. A plurality of openings are formed through the first plate, communicating with the loading groove and approximately equally spaced about the groove. A plurality of rods are attached to the second plate, each rod slidable in one of the openings. In use, the loaded tool is inserted into a hollow pipe or pipe fitting having an internal flange and an internal seating groove, such that the gasket is positioned against the flange and the ring is in the approximate plane of the seating groove. The sleeve is pushed against the second plate, sliding the second plate towards the first plate, compressing the spring and sliding the rods forwards in the openings. The rods engage the snap ring and urge the ring from the loading groove into the seating groove.

  3. Secretary Chu Announces Two Million Smart Grid Meters Installed Nationwide

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Million Smart Grid Meters Installed Nationwide Secretary Chu Announces Two Million Smart Grid Meters Installed Nationwide August 31, 2010 - 12:00am Addthis Columbus, OH - At an event today at Battelle headquarters in Columbus, Ohio, U.S. Energy Secretary Steven Chu announced that two million smart grid meters have been installed across the country, helping to reduce energy costs for families and businesses. As a result of funding from the Recovery Act, smart grid

  4. Focus Series: Maine - Residential Direct Install Program | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Maine - Residential Direct Install Program Focus Series: Maine - Residential Direct Install Program Better Buildings Neighborhood Program Focus Series: Maine - Residential Direct Install Program: Residential Air Sealing Program Drives Maine Home Energy Savings Through the Roof. PDF icon Focus Series: Maine More Documents & Publications Better Buildings: Financing and Incentives: Spotlight on Maine: Transition to a Sustainable Level of Incentives Spotlight on Maine: Transition to a

  5. Energy Department Completes Cool Roof Installation on DC Headquarters

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building to Save Money by Saving Energy | Department of Energy Completes Cool Roof Installation on DC Headquarters Building to Save Money by Saving Energy Energy Department Completes Cool Roof Installation on DC Headquarters Building to Save Money by Saving Energy December 14, 2010 - 12:00am Addthis Washington - Secretary Steven Chu today announced the completion of a new cool roof installation on the Department of Energy's Headquarters West Building. There was no incremental cost to adding

  6. Energy Secretary Chu Announces Five Million Smart Meters Installed

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nationwide as Part of Grid Modernization Effort | Department of Energy Five Million Smart Meters Installed Nationwide as Part of Grid Modernization Effort Energy Secretary Chu Announces Five Million Smart Meters Installed Nationwide as Part of Grid Modernization Effort June 13, 2011 - 12:00am Addthis Washington, DC - At a White House Grid Modernization event today, U.S. Department of Energy Secretary Steven Chu announced that more than five million smart meters have been installed nationwide

  7. Building Life Cycle Cost Programs Software Installation Troubleshooting |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Software Installation Troubleshooting Building Life Cycle Cost Programs Software Installation Troubleshooting Having trouble downloading the Building Life Cycle Cost (BLCC) Programs software? Macintosh Operating Systems If you are receiving the "Download.app is damaged and can't be opened" error message when you attempt to install the BLCC software on your Macintosh operating system, visit the Tech Recipes website for instruction on how to change your security

  8. U.S. Installation, Operation, and Performance Standards for Microturbine

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Generator Sets, August 2000 | Department of Energy Installation, Operation, and Performance Standards for Microturbine Generator Sets, August 2000 U.S. Installation, Operation, and Performance Standards for Microturbine Generator Sets, August 2000 This report reviews the codes and standards applicable to the safe installation and operation of microturbines in commercial and residential buildings. It provides an overview of potential regulatory roadblocks, as well as recommendations for

  9. Making the Connection: Beneficial Collaboration Between Army Installations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Energy Utility Companies | Department of Energy Making the Connection: Beneficial Collaboration Between Army Installations and Energy Utility Companies Making the Connection: Beneficial Collaboration Between Army Installations and Energy Utility Companies Presentation-given at the Fall 2011 Federal Utility Partnership Working Group (FUPWG) meeting-covers a RAND study to develop recommendations for improving Army installation collaboration with utilities to reduce traditional energy

  10. Tracking the Sun VIII: The Installed Price of Residential and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Non-Residential Photovoltaic Systems in the United States | Department of Energy Tracking the Sun VIII: The Installed Price of Residential and Non-Residential Photovoltaic Systems in the United States Tracking the Sun VIII: The Installed Price of Residential and Non-Residential Photovoltaic Systems in the United States Now in its eighth edition, Lawrence Berkeley National Laboratory (LBNL)'s Tracking the Sun report series is dedicated to summarizing trends in the installed price of

  11. Factors Affecting PMU Installation Costs (October 2014) | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Factors Affecting PMU Installation Costs (October 2014) Factors Affecting PMU Installation Costs (October 2014) The Department of Energy investigated the major cost factors that affected PMU installation costs for the synchrophasor projects funded through the Recovery Act Smart Grid Programs. The data was compiled through interviews with the nine projects that deployed production grade synchrophasor systems. The study found that while the costs associated with PMUs as stand-alone

  12. Better Buildings Neighborhood Program Data Installed Measures | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Installed Measures Better Buildings Neighborhood Program Data Installed Measures Building project data for 75,110 single-family homes upgraded between July 1, 2010, and September 30, 2013, are available. Reported data for some elements have been transformed, and to protect privacy, data for some upgraded homes have been omitted. File BBNP Installed Measures More Documents & Publications Better Buildings Neighborhood Program Data Documentation DOE Zero Energy Ready Home Savings

  13. PNNL Reports Distributed Wind Installations Down, Exports Up in 2013 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Reports Distributed Wind Installations Down, Exports Up in 2013 PNNL Reports Distributed Wind Installations Down, Exports Up in 2013 March 31, 2014 - 11:14am Addthis According to the second annual Market Report on Wind Technologies in Distributed Applications soon to be published by DOE's Pacific Northwest National Laboratory, U.S. wind turbines in distributed applications reached a cumulative installed capacity of 842 MW at the end of 2013, reflecting nearly 72,000

  14. Home Solar Installations: Things to Consider | Department of Energy

    Energy Savers [EERE]

    Home Solar Installations: Things to Consider Home Solar Installations: Things to Consider May 29, 2013 - 3:18pm Addthis Home solar systems can save you energy and money. | Photo courtesy of Dennis Schroeder, NREL 22168. Home solar systems can save you energy and money. | Photo courtesy of Dennis Schroeder, NREL 22168. Erin Connealy Communications Specialist, Office of Energy Efficiency and Renewable Energy How can I participate? Read these considerations for installing a home solar electric

  15. Workplace Charging Challenge: Install and Manage PEV Charging at Work |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Install and Manage PEV Charging at Work Workplace Charging Challenge: Install and Manage PEV Charging at Work pev_workplace_charging_hosts_150x194.jpg To determine if workplace charging is right for your organization, use the employer resources to learn more about PEVs and charging stations. The PEV Handbook for Workplace Charging Hosts is particularly helpful for employers deciding if and how to install charging stations to ensure a successful workplace charging

  16. Floodplain Assessment for Installation of a Renewable Energy Anaerobic

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Digester Facility | Department of Energy for Installation of a Renewable Energy Anaerobic Digester Facility Floodplain Assessment for Installation of a Renewable Energy Anaerobic Digester Facility Floodplain Assessment for Installation of a Renewable Energy Anaerobic Digester Facility at the University of California, Davis in Yolo County, California, as posted on the U.S. Department of Energy website. PDF icon Floodplain Assessment More Documents & Publications Floodplain Assessment and

  17. Installing and Maintaining a Home Solar Electric System | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Home Solar Electric System Installing and Maintaining a Home Solar Electric System When choosing a contractor, ask about their work record, experience, and licenses, and get more than one bid for the installation of your PV system. | Photo courtesy of Dennis Schroeder, NREL. When choosing a contractor, ask about their work record, experience, and licenses, and get more than one bid for the installation of your PV system. | Photo courtesy of Dennis Schroeder, NREL. Making sure your

  18. Final row of solar panels installed at Livermore | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration Blog Final row of solar panels installed at Livermore Monday, January 11, 2016 - 1:14pm NNSA Blog The last row of panels at the Whitethorn Solar Facility project site at Lawrence Livermore National Laboratory in California was installed last week. When complete, the 3.3 MW fixed-tilt solar photovoltaic facility will represent the largest DOE/NNSA purchase of solar energy from an onsite facility. Electrical installation will continue for several more weeks, then

  19. How To Apply

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CSCNSI How To Apply How to Apply for Computer System, Cluster, and Networking Summer Institute Emphasizes practical skills development Contact Leader Stephan Eidenbenz (505)...

  20. Tracking the Sun VIII: The Installed Price of Residential and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Non-Residential Photovoltaic Systems in the United States Tracking the Sun VIII: The Installed Price of Residential and Non-Residential Photovoltaic Systems in the United ...

  1. Permit for Charging Equipment Installation: Electric Vehicle Supply Equipment (EVSE)

    Broader source: Energy.gov [DOE]

    Jurisdiction's can use this template to develop a standard permit for residential charging stations that allows for quick, safe installation of EVSE.

  2. Design, Installation, and Field Verification of Integrated Active...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Design, Installation, and Field Verification of Integrated Active Desiccant Hybrid Rooftop Systems Combined with a Natural Gas Driven Cogeneration Package, 2008 Design, ...

  3. LANL installs high-performance computer system | National Nuclear...

    National Nuclear Security Administration (NNSA)

    computer system Los Alamos National Laboratory recently installed a new high-performance computer system, called Wolf, which will be used for unclassified research. Wolf will help...

  4. Net Zero Energy Military Installations: A Guide to Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to reduce energy demand and increase use of renewable energy on DoD installations. PDF icon 48876.pdf More Documents & Publications Lessons Learned from Net Zero Energy...

  5. Choosing and Installing Geothermal Heat Pumps | Department of...

    Energy Savers [EERE]

    When selecting and installing a geothermal heat pump, consider the heating and cooling ... Evaluating Your Site for a Geothermal Heat Pump Shallow ground temperatures are relatively ...

  6. Fact #893: October 5, 2015 Incentives for the Installation of...

    Broader source: Energy.gov (indexed) [DOE]

    Incentives for the Installation of Electric Vehicle Charging Stations fotw893web.xlsx More Documents & Publications Richmond Electric Vehicle Initiative Electric Vehicle...

  7. First Magnet Girder Installed in NSLS-II Storage Ring

    ScienceCinema (OSTI)

    Frank Lincoln

    2013-07-19

    Supervisor Frank Lincoln explains how the first magnet girder is installed in the storage ring of Brookhaven National Laboratory's National Synchrotron Light Source II (NSLS-II).

  8. Database (Report) of U.S. CHP Installations Incorporating Thermal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Turbine Inlet Cooling (TIC), 2004 Database (Report) of U.S. CHP Installations Incorporating Thermal Energy Storage (TES) andor Turbine Inlet Cooling (TIC), 2004 The primary ...

  9. U.S. CHP Installations Incorporating Thermal Energy Storage ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    andor Turbine Inlet Cooling (TIC), September 2003 U.S. CHP Installations Incorporating Thermal Energy Storage (TES) andor Turbine Inlet Cooling (TIC), September 2003 This 2003 ...

  10. Spain Installed Wind Capacity Website | Open Energy Information

    Open Energy Info (EERE)

    URI: cleanenergysolutions.orgcontentspain-installed-wind-capacity-website Language: English Policies: Regulations Regulations: Feed-in Tariffs This website presents an...

  11. Consider Installing Turbulators on Two- and Three-Pass Firetube...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Consider Installing Turbulators on Two- and Three-Pass Firetube Boilers Firetube Boilers The packaged fretube boiler is the most common boiler design used to provide heating or ...

  12. Consider Installing High-Pressure Boilers with Backpressure Turbine...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Consider Installing High-Pressure Boilers with Backpressure Turbine-Generators When specifying a new boiler, consider a high-pressure boiler with a backpressure steam ...

  13. New England Breeze Solar and Wind Installers | Open Energy Information

    Open Energy Info (EERE)

    Greater Boston Area Sector: Renewable energy, Services, Solar, Wind energy Product: Solar Panel and Wind Turbine Installation Year Founded: 2006 Phone Number: 978-567-9463...

  14. DOE-DOD Emergency Backup Power Fuel Cell Installations

    Fuel Cell Technologies Publication and Product Library (EERE)

    Ths fact sheet describes a collaboration between the departments of Energy and Defense to install and operate 18 fuel cell backup power systems across the United States.

  15. Installing and Maintaining a Home Solar Electric System | Department...

    Energy Savers [EERE]

    Making sure your home solar electric or photovoltaic (PV) system is sized, sited, installed, and maintained correctly is essential for maximizing its energy performance. When...

  16. Oregon Construction/Installation Permit for Onsite Wastewater...

    Open Energy Info (EERE)

    ConstructionInstallation Permit for Onsite Wastewater Treatment System Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Oregon Construction...

  17. Net Zero Energy Military Installations: A Guide to Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Net Zero Energy Military Installations: A Guide to Assessment and Planning Samuel Booth, John Barnett, Kari Burman, Josh Hambrick and Robert Westby Technical Report NREL...

  18. Solar Regional Test Center in Vermont Achieves Milestone Installation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Installation HomeConcentrating Solar Power, Energy, Facilities, National Solar ... Meeting the last 40% without compromising quality will be challenging. To help US industry ...

  19. Installer Issues: Integrating Distributed Wind into Local Communities (Presentation)

    SciTech Connect (OSTI)

    Green, J.

    2006-06-01

    A presentation for the WindPower 2006 Conference in Pittsburgh, PA, regarding the issues facing installer of small wind electric systems.

  20. Electricity production and cooling energy savings from installation...

    Office of Scientific and Technical Information (OSTI)

    Electricity production and cooling energy savings from installation of a ... Citation Details In-Document Search Title: Electricity production and cooling energy ...

  1. Milwaukee Installer Reflects on His Career In Solar | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Brian Webster (left) and Mario Richard install photovoltaic modules on an Englewood, Colorado, home. | Photo by Dennis Schroeder, NREL. Erin R. Pierce Erin R. Pierce Former Digital ...

  2. Consider Installing Turbulators on Two- and Three-Pass Firetube...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon Consider Installing Turbulators on Two- and Three-Pass Firetube Boilers (January 2012) More Documents & Publications Clean Boiler Waterside Heat Transfer Surfaces CIBO ...

  3. ADA Requirements for Workplace Charging Installation | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    PDF icon ADA Requirements for Workplace Charging Installation More Documents & Publications Richmond Electric Vehicle Initiative Electric Vehicle Readiness Plan Workplace Charging Presentation Request for Proposal Guidance

  4. Characterization of the Installed Costs of Prime Movers Using...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Supplementary costs are often involved with the installation of power generating equipment utilizing opportunity fuels. In particular, landfill gas (LFG) and anaerobic digester gas ...

  5. NMDOT Application for Permit to Install Utility Facilities Within...

    Open Energy Info (EERE)

    windex.php?titleNMDOTApplicationforPermittoInstallUtilityFacilitiesWithinPublicROW&oldid816935" Feedback Contact needs updating Image needs updating Reference...

  6. Global Solar Photovoltaic (PV) Installation Market to be Propelled...

    Open Energy Info (EERE)

    Global Solar Photovoltaic (PV) Installation Market to be Propelled by Greater Concerns over Carbon Footprint Home > Groups > Renewable Energy RFPs John55364's picture Submitted by...

  7. Helping Ensure High-Quality Installation of Solar Power Technologies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology Maximizes Taxpayer's Investment Mercer Island celebrates the 500th Solarize installation in the state of Washington with a ribbon cutting at the Auto-Spa car wash. ...

  8. Electric Vehicle Grid Integration for Sustainable Military Installations (Presentation)

    SciTech Connect (OSTI)

    Simpson, M.

    2011-05-05

    This presentation discusses electric vehicle grid integration for sustainable military installations. Fort Carson Military Reservation in Colorado Springs is used as a case study.

  9. DOE-DOD Emergency Backup Power Fuel Cell Installations

    SciTech Connect (OSTI)

    Fuel Cell Technologies Program

    2012-06-01

    Ths fact sheet describes a collaboration between the departments of Energy and Defense to install and operate 18 fuel cell backup power systems across the United States.

  10. Evaluation of Trenchless Technologies for Installation of Pipelines...

    Office of Scientific and Technical Information (OSTI)

    Title: Evaluation of Trenchless Technologies for Installation of Pipelines in Radioactive Environments - 10249 No abstract prepared. Authors: Jubin, Robert Thomas 1 ; Patton, ...

  11. Applied Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ARC Privacy and Security Notice Skip over navigation Search the JLab Site Applied Research Center Please upgrade your browser. This site's design is only visible in a graphical browser that supports web standards, but its content is accessible to any browser. Concerns? Applied Research Center ARC Home Consortium News EH&S Reports print version ARC Resources Commercial Tenants ARC Brochure Library Conference Room Applied Research Center Applied Research Center front view Applied Research

  12. Targeting Net Zero Energy for Military Installations (Presentation)

    SciTech Connect (OSTI)

    Burman, K.

    2012-05-01

    Targeting Net Zero Energy for Military Installations in Kaneohe Bay, Hawaii. A net zero energy installation (NZEI) is one that produces as much energy from on-site renewable sources as it consumes. NZEI assessment provides a systematic approach to energy projects.

  13. Safeguards-by-Design: Guidance for Independent Spent Fuel Dry Storage Installations (ISFSI)

    SciTech Connect (OSTI)

    Trond Bjornard; Philip C. Durst

    2012-05-01

    This document summarizes the requirements and best practices for implementing international nuclear safeguards at independent spent fuel storage installations (ISFSIs), also known as Away-from- Reactor (AFR) storage facilities. These installations may provide wet or dry storage of spent fuel, although the safeguards guidance herein focuses on dry storage facilities. In principle, the safeguards guidance applies to both wet and dry storage. The reason for focusing on dry independent spent fuel storage installations is that this is one of the fastest growing nuclear installations worldwide. Independent spent fuel storage installations are typically outside of the safeguards nuclear material balance area (MBA) of the reactor. They may be located on the reactor site, but are generally considered by the International Atomic Energy Agency (IAEA) and the State Regulator/SSAC to be a separate facility. The need for this guidance is becoming increasingly urgent as more and more nuclear power plants move their spent fuel from resident spent fuel ponds to independent spent fuel storage installations. The safeguards requirements and best practices described herein are also relevant to the design and construction of regional independent spent fuel storage installations that nuclear power plant operators are starting to consider in the absence of a national long-term geological spent fuel repository. The following document has been prepared in support of two of the three foundational pillars for implementing Safeguards-by-Design (SBD). These are: i) defining the relevant safeguards requirements, and ii) defining the best practices for meeting the requirements. This document was prepared with the design of the latest independent dry spent fuel storage installations in mind and was prepared specifically as an aid for designers of commercial nuclear facilities to help them understand the relevant international requirements that follow from a countrys safeguards agreement with the IAEA. If these requirements are understood at the earliest stages of facility design, it will help eliminate the costly retrofit of facilities that has occurred in the past to accommodate nuclear safeguards, and will help the IAEA implement nuclear safeguards worldwide, especially in countries building their first nuclear facilities. It is also hoped that this guidance document will promote discussion between the IAEA, State Regulator/SSAC, Project Design Team, and Facility Owner/Operator at an early stage to ensure that new ISFSIs will be effectively and efficiently safeguarded. This is intended to be a living document, since the international nuclear safeguards requirements may be subject to revision over time. More importantly, the practices by which the requirements are met are continuously modernized by the IAEA and facility operators for greater efficiency and cost effectiveness. As these improvements are made, it is recommended that the subject guidance document be updated and revised accordingly.

  14. Preliminary assessment report for Waiawa Gulch, Installation 15080, Pearl City, Oahu, Hawaii. Installation Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Hawaii Army National Guard (HIARNG) property near Pearl City, Oahu, Hawaii. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Waiawa Gulch property, phase I of the Department of Defense Installation Restoration Program (IRP).

  15. Preliminary assessment report for Fort Jacob F. Wolters, Installation 48555, Mineral Wells, Texas. Installation Restoration Program

    SciTech Connect (OSTI)

    Dennis, C.B.

    1993-08-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard (TXARNG) property near Mineral Wells, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Fort Wolters property, the requirement of the Department of Defense Installation Restoration Program.

  16. Preliminary assessment report for Fort Custer Training Center, Installation 26035, Augusta, Michigan. Installation Restoration Program

    SciTech Connect (OSTI)

    Flaim, S.; Krokosz, M.

    1993-08-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Michigan Army National Guard property near Augusta, Michigan. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Fort Custer Training Center, phase I of the Department of Defense Installation Restoration Program. The environmentally significant operations associated with the property are (1) storage of hazardous materials and hazardous waste, (2) storage and dispensing of fuel, (3) washing of vehicles and equipment, and (4) weapons training ranges that may have accumulated lead.

  17. Preliminary assessment report for Camp Swift Military Reservation, Installation 48070, Bastrop County, Texas. Installation Restoration Program

    SciTech Connect (OSTI)

    Dennis, C.B.

    1993-08-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard property in Bastrop County, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Camp Swift property, the requirement of the Department of Defense Installation Restoration Program (IRP). The review of both historical and current practices at the property indicated that the activities at Camp Swift include no operations considered to have an adverse impact to the environment. The recommendation, therefore, is that no further IRP action is necessary at this property.

  18. Garden Banks 388 pipeline jumper testing and installation

    SciTech Connect (OSTI)

    Hale, J.R.; Davis, S.W.; Prescott, C.N.

    1995-12-31

    This paper describes practical aspects of the diverless jumper connection system used to connect Enserch`s two 12-inch pipelines to the subsea template in 2,110 feet water depth. The paper is a follow-on paper to OTC 7543 which describes engineering aspects of the same jumper system. Project costs, schedule, and details of the jumper testing and installation are discussed. Testing was performed to verify jumper design and installation operations. Offshore installation used two measurement methods for verification of jumper geometry.

  19. Installing and Maintaining a Small Wind Electric System | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Small Wind Electric System Installing and Maintaining a Small Wind Electric System Installing and Maintaining a Small Wind Electric System If you went through the planning steps to evaluate whether a small wind electric system will work at your location, you will already have a general idea about: The amount of wind at your site The zoning requirements and covenants in your area The economics, payback, and incentives of installing a wind system at your site. Now, it is time to look at

  20. Apparatus for installing condition-sensing means in subterranean earth formations

    DOE Patents [OSTI]

    Shuck, Lowell Z.

    1981-01-01

    The present invention is directed to an apparatus for installing strain gages or other sensors-transducers in wellbores penetrating subterranean earth formations. The subject apparatus comprises an assembly which is lowered into the wellbore, secured in place, and then actuated to sequentially clean the wellbore or casing surface at a selected location with suitable solvents, etchants and neutralizers, grind the surface to a relatively smooth finish, apply an adhesive to the surface, and attach the strain gages or the like to the adhesive-bearing surface. After installing the condition-sensing gages to the casing or earth formation the assembly is withdrawn from the wellbore leaving the sensing gages securely attached to the casing or the subterranean earth formation.

  1. Installing and Maintaining a Home Solar Electric System | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    a Home Solar Electric System When choosing a contractor, ask about their work record, experience, and licenses, and get more than one bid for the installation of your PV...

  2. Energy Department Completes Cool Roof Installation on DC Headquarters...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    today a video with Secretary Chu that shows the installation of the roof and explains some of the benefits that come with this important technology. The video is available ...

  3. Installing and Operating an Efficient Swimming Pool Pump | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Table courtesy of Home Energy magazine. These savings ... For a solar pool heating system, you also need to consider ... You can install a timer to control the pump's cycling. If ...

  4. Milwaukee Installer Reflects on His Career In Solar | Department...

    Broader source: Energy.gov (indexed) [DOE]

    market. Follow our weeklong series to hear from Milwaukee-based installers, residents and city leaders on what it's like to be a part of this solar community. Share your...

  5. Installing and Maintaining a Small Wind Electric System | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Deciding whether to connect the system to the electric grid or not. Installation and Maintenance The manufacturer of your wind system, or the dealer where you bought it, should be...

  6. DoD Energy Innovation on Military Installations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Facility Energy 49% 32% 8% 7% 3% 1% 0% Electricity Natural Gas Fuel Oil Coal Steam LPG Other Test Bed Focus 4 Smart Secure Installation Energy Management * Microgrids * Energy ...

  7. Energy Department Completes Cool Roof Installation on DC Headquarters...

    Broader source: Energy.gov (indexed) [DOE]

    replacement project and it will save taxpayers 2,000 every year in building energy costs. ... As a result of the new cool roof installations on both buildings, taxpayers will save a ...

  8. Data Safer than Ever with FM-200 Installation

    Broader source: Energy.gov [DOE]

    The consolidated data center at the Legacy Management Business Center (LMBC) in Morgantown, West Virginia, is now guarded by a state-of-the-art FM-200® Fire Suppression System. Installation of the...

  9. Tracking the Sun VIII. The Installed Price of Residential and...

    Office of Scientific and Technical Information (OSTI)

    Tracking the Sun VIII. The Installed Price of Residential and Non-Residential Photovoltaic Systems in the United States Citation Details In-Document Search Title: Tracking the Sun ...

  10. ARRA Program Celebrates Milestone 600,000 Smart Meter Installations

    Broader source: Energy.gov [DOE]

    On April 11, 2012, DOE Recovery Act funding recipient Sacramento Municipal Utility District (SMUD) celebrated a major milestone in the development of a regional smart grid in California: the installation of over 600,000 smart meters.

  11. Income Tax Deduction for the Installation of Building Insulation

    Broader source: Energy.gov [DOE]

    A residential taxpayer is entitled to an Indiana income tax deduction on the materials and labor used to install insulation in a taxpayer’s principal place of residence in Indiana. 

  12. Offshore Wind Energy Market Installed Capacity is Anticipated...

    Open Energy Info (EERE)

    Offshore Wind Energy Market Installed Capacity is Anticipated to Reach 52,120.9 MW by 2022 Home > Groups > Renewable Energy RFPs Wayne31jan's picture Submitted by Wayne31jan(150)...

  13. Design and Installation of a Disposal Cell Cover Field Test ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    February 27 through March 3, 2011, Phoenix, Arizona. C.H. Benson, W.J. Waugh, W.H. Albright, G.M. Smith, R.P. Bush PDF icon Design and Installation of a Disposal Cell Cover Field ...

  14. NIPSCO Small Business Direct Install Electric and Natural Gas Program

    Broader source: Energy.gov [DOE]

    NIPSCO's Small Business Direct Install Program is designed to help small businesses minimize energy costs, and provides energy-saving CFL lighting, showerheads and faucet aerators at no added cost.

  15. Reviewing Post-Installation and Annual Reports for Federal ESPC...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This document is posted on FEMP's Web site at www.eere.energy.govfempfinancing... 4: ESPC Performance Report Checklists (v 2.0) 7 Post-Installation Report Checklists 8 ...

  16. Focus Series … Maine Residential Direct Install Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    six hours of air sealing work done, as well as pre- and post-installation blower door tests. ... You may need to experiment to find the "sweet spot" that balances what the critical ...

  17. Install and Automatic Blowdown Control System - Steam Tip Sheet #23

    SciTech Connect (OSTI)

    2012-01-01

    This revised AMO steam tip sheet on installing automatic blowdown controls provide how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  18. Install Waste Heat Recovery Systems for Fuel-Fired Furnaces;...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Install Waste Heat Recovery Systems for Fuel-Fired Furnaces For most fuel-fired heating equipment, a large amount of the heat supplied is wasted as exhaust or flue gases. ...

  19. High-performance computer system installed at Los Alamos National

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory High-performance computer system installed at Lab High-performance computer system installed at Los Alamos National Laboratory New high-performance computer system, called Wolf, will be used for unclassified research. June 17, 2014 The Wolf computer system modernizes mid-tier resources for Los Alamos scientists. The Wolf computer system modernizes mid-tier resources for Los Alamos scientists. Contact Nancy Ambrosiano Communications Office (505) 667-0471 Email "This machine

  20. Energy Jobs: Electric Vehicle Charging Station Installer | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Electric Vehicle Charging Station Installer Energy Jobs: Electric Vehicle Charging Station Installer October 28, 2014 - 3:23pm Addthis As the demand for electric vehicles goes up, charging stations become more prevalent -- here an electric vehicle owner uses a local charging station. | Photo Courtesy of the Energy Department. As the demand for electric vehicles goes up, charging stations become more prevalent -- here an electric vehicle owner uses a local charging station. | Photo

  1. Evaluation of Trenchless Technologies for Installation of Pipelines in

    Office of Scientific and Technical Information (OSTI)

    Radioactive Environments - 10249 (Conference) | SciTech Connect Evaluation of Trenchless Technologies for Installation of Pipelines in Radioactive Environments - 10249 Citation Details In-Document Search Title: Evaluation of Trenchless Technologies for Installation of Pipelines in Radioactive Environments - 10249 No abstract prepared. Authors: Jubin, Robert Thomas [1] ; Patton, Bradley D [1] ; Robinson, Sharon M [1] ; Sullivan, Nicholas M [1] ; Bugbee, Kathy P [1] + Show Author Affiliations

  2. High-performance computer system installed at Los Alamos National

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory High-performance computer system installed at Los Alamos National Laboratory Alumni Link: Opportunities, News and Resources for Former Employees Latest Issue:September 2015 all issues All Issues » submit High-performance computer system installed at Los Alamos National Laboratory New high-performance computer system, called Wolf, will be used for unclassified research September 2, 2014 New insights to changing the atomic structure of metals The Wolf computer system modernizes

  3. Sequential Linker Installation: Precise Placement of Functional Groups in

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Multivariate Metal-Organic Frameworks | Center for Gas SeparationsRelevant to Clean Energy Technologies | Blandine Jerome Sequential Linker Installation: Precise Placement of Functional Groups in Multivariate Metal-Organic Frameworks Previous Next List Yuan, Shuai; Lu, Weigang; Chen, Ying-Pin; Zhang, Qiang; Liu, Tian-Fu; Feng, Dawei; Wang, Xuan; Qin, Junsheng; Zhou, Hong-Cai, J. Am. Chem. Soc., 137, 3177-3180 (2015) DOI: 10.1021/ja512762r sequential linker installation Abstract: A unique

  4. Patrice Turchi Installed as 2015 TMS President | Critical Materials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Institute Patrice Turchi Installed as 2015 TMS President Submitted by mlthach on Tue, 03/31/2015 - 13:41 TMS installed Patrice Turchi as its 2015 President on March 17, 2015. Publish Date: Sunday, March 22, 2015 - 13:45 Article URL: http://www.newswise.com/articles/view/631506/?sc=rsla&utm_content=bufferf46a7&utm_medium=social&utm_source=twitter.com&utm_campaign=buffer Article Source: Newswise

  5. WIPP Installs Underground Personnel Notification and Tracking System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1, 2016 WIPP Installs Underground Personnel Notification and Tracking System A new underground Wireless Notification and Tracking System (WNTS) has been installed at the Waste Isolation Pilot Plant (WIPP) that allows for two-way communication for both talk and text, audible and flashing alarms and allows personnel to immediately signal the Central Monitoring Room (CMR) in the event of an emergency. It also provides real-time tracking of all personnel entering the WIPP underground. "I'm

  6. QER SECOND INSTALLMENT PUBLIC MEETING-LOS ANGELES, CALIFORNIA |

    Office of Environmental Management (EM)

    Department of Energy LOS ANGELES, CALIFORNIA QER SECOND INSTALLMENT PUBLIC MEETING-LOS ANGELES, CALIFORNIA MEETING DATE AND LOCATION Tuesday, May 10, 2016 Doors open: 8:30 AM; Program begins: 9:00 AM Los Angeles City Hall Tom Bradley Tower Room 200 North Spring Street Los Angeles, CA 90012 Watch the meeting live here. MEETING INFORMATION The Quadrennial Energy Review Task Force will host a public stakeholder meeting on the second installment of the Quadrennial Energy Review (QER), an

  7. Safeguards Guidance for Independent Spent Fuel Storage Installations (ISFSI)

    National Nuclear Security Administration (NNSA)

    1) May 2012 Guidance for Independent Spent Fuel Dry Storage Installations Safeguards-by-Design: Guidance for Independent Spent Fuel Dry Storage Installations (ISFSI) Philip Casey Durst (INL Consultant) DISCLAIMER This information was prepared as an account of work sponsored by an agency of the U.S. Government. Neither the U.S. Government nor any agency thereof, nor any of their employees, makes any warranty, expressed or implied, or assumes any legal liability or responsibility for the accuracy,

  8. New concept for a general purpose subsea installation system

    SciTech Connect (OSTI)

    Citi, G.; Cowen, S.; Radicioni, A.

    1996-12-31

    The first use of the Agip SAF System (Sistema Alti Fondali), an installation and maintenance system for subsea production systems up to 1,000 m water depth, was successfully performed on the Luna 40 well in 180 m w.d. The system successfully installed the christmas tree, flowline jumpers, control system and high pressure cap as well as deploying the LMRP to allow the commissioning of the well. The SAF system performed all the planned tasks during the installation of the Luna 40 subsea tree and now has to be considered an operational success. The system is based around a Master Vehicle that provides hydraulic power to, and controls a set of dedicated work modules. During the 2 test and 5 working dives, the Master Vehicle and the modules were subsea for a considerable period of time, up to 75 hours continuously, without any operational failures. This installation uncovered some system deficiencies that will have to be studied to improve the reliability and operability of the system. From the experience gained during this operation it has been shown that the system of a Master Vehicle providing locally generated hydraulic power is a feasible approach to many subsea installation problems. This paper describes the SAF system including improvements to be performed before being used operationally in up to 1,000 m of water and over. It also covers the necessary modifications required to allow the system to be deployed from a wide range of installation vessel.

  9. SeaStar: Subsea cluster manifold system design and installation

    SciTech Connect (OSTI)

    Mason, P.G.T.; Upchurch, J.L.

    1996-12-31

    The SeaStar Cluster Manifold system was engineered as a low cost alternative to larger and more expensive completion template designs. Utilizing field-proven equipment and installation techniques, it was the first of its kind to be installed in the Gulf of Mexico. The Cluster Manifold system allows the connection of flowlines from adjacent satellite wells and numerous infield flowlines consisting of export, service, and methanol lines. With new technological advances, and a variety of flowline connection systems on the market today, deep water completions are being used with increasing frequency. Subsea operations are becoming more routine and installation times are being reduced. The SeaStar system was successfully installed in Garden Banks Block 70/71 in the Gulf of Mexico during the first quarter of 1995. Currently two 4 x 2-in. 10,000 psi lay-away trees are installed and connected to the manifold. Production is being processed at a Marathon platform in Vermilion Block 386B approximately 13.5 miles away from the subsea installation.

  10. Applied Energy Programs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (DoD) programs at Los Alamos, and to industry through the Laboratory's Technology Transfer Division. The Applied Energy programs encompass the broad set of energy focus areas:...

  11. Applied & Computational Math

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    & Computational Math - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us ... Twitter Google + Vimeo GovDelivery SlideShare Applied & Computational Math HomeEnergy ...

  12. Applied Math & Software

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Math & Software - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us ... Twitter Google + Vimeo GovDelivery SlideShare Applied Math & Software HomeTransportation ...

  13. Renewable Energy Opportunities at the Kanto Installations, Japan

    SciTech Connect (OSTI)

    Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.; Gorrissen, Willy J.; Kora, Angela R.; Weimar, Mark R.; Hand, James R.; Orrell, Alice C.; Williamson, Jennifer L.

    2010-09-24

    This document provides an overview of renewable resource development potential at the U.S. Army installations in the Kanto region in Japan, which includes Camp Zama, Yokohama North Dock, Sagamihara Family Housing Area (SFHA), Sagami General Depot, and Akasaka Press Center. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the Huntsville Army Corps of Engineers, and includes the development of a methodology for renewable resource assessment at Army installations located on foreign soil. The methodology is documented in Renewable Energy Assessment Methodology for Japanese OCONUS Army Installations. The site visit to the Kanto installations took place on April 5 and 6, 2010. At the current time, there are some renewable technologies that show economic potential. Because of siting restrictions and the small size of these installations, development of most renewable energy technologies will likely be limited to Camp Zama. Project feasibility is based on installation-specific resource availability and energy costs and projections based on accepted life-cycle cost methods. Development of any renewable energy project will be challenging, as it will require investigation into existing contractual obligations, new contracts that could be developed, the legality of certain partnerships, and available financing avenues, which involves the U.S. Forces Japan (USFJ), the Government of Japan (GOJ), and a number of other parties on both sides. The Army will not be able to implement a project without involvement and approval from the other services and multiple levels of Japanese government. However, implementation of renewable energy projects could be an attractive method for GOJ to reduce greenhouse gas emissions and lower annual utility payments to USFJ. This report recommends projects to pursue and offers approaches to use. The most promising opportunities include waste-to-energy and ground source heat pumps. Solar photovoltaics (PV) may also prove successful. Other resources were found to be insufficient on the Kanto installations.

  14. Active control of low frequency sound in a gas turbine compressor installation

    SciTech Connect (OSTI)

    Swinbanks, M.A.

    1982-01-01

    During the last decade, the development of active attenuators has progressed from theoretical analysis, through laboratory experiments of increasing sophistication to the stage where their practical application to certain large scale industrial sources has finally become reality. This paper outlines some features which the author has investigated in the laboratory, and concludes with a description of the results achieved in applying these techniques to an 11 M.W. Avon Gas Turbine Compressor Installation. The active control hardware necessary to achieve these results represented a very considerable cost saving compared to the estimated cost of achieving similar performance by passive means.

  15. Thin-film flat-plate solar collectors for low-cost manufacture and installation

    SciTech Connect (OSTI)

    Andrews, J.W.; Wilhelm, W.G.

    1980-03-01

    A flat-plate solar energy collector design using thin-film plastics in both the absorber and glazing is described. The design approach proceeded in two steps. First, cost constraints on solar collectors were determined using reasonable economic projections. Second, engineering was applied only to those ideas which had hope of falling within those cost boundaries. The use of thin-film plastics appeared most attractive according to these criteria. The nature of the marketing and distribution network can be expected to have a strong impact on the final installed cost of the collector; the proposed design has characteristics which could make possible a reduced price markup.

  16. Renewable Energy Assessment Methodology for Japanese OCONUS Army Installations

    SciTech Connect (OSTI)

    Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.; Gorrissen, Willy J.; Kora, Angela R.; Weimar, Mark R.; Hand, James R.; Orrell, Alice C.; Williamson, Jennifer L.

    2010-08-30

    Since 2005, Pacific Northwest National Laboratory (PNNL) has been asked by Installation Management Command (IMCOM) to conduct strategic assessments at selected US Army installations of the potential use of renewable energy resources, including solar, wind, geothermal, biomass, waste, and ground source heat pumps (GSHPs). IMCOM has the same economic, security, and legal drivers to develop alternative, renewable energy resources overseas as it has for installations located in the US. The approach for continental US (CONUS) studies has been to use known, US-based renewable resource characterizations and information sources coupled with local, site-specific sources and interviews. However, the extent to which this sort of data might be available for outside the continental US (OCONUS) sites was unknown. An assessment at Camp Zama, Japan was completed as a trial to test the applicability of the CONUS methodology at OCONUS installations. It was found that, with some help from Camp Zama personnel in translating and locating a few Japanese sources, there was relatively little difficulty in finding sources that should provide a solid basis for conducting an assessment of comparable depth to those conducted for US installations. Project implementation will likely be more of a challenge, but the feasibility analysis will be able to use the same basic steps, with some adjusted inputs, as PNNLs established renewable resource assessment methodology.

  17. Applied Science/Techniques

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Applied ScienceTechniques Print The ALS is an excellent incubator of new scientific techniques and instrumentation. Many of the technical advances that make the ALS a world-class...

  18. How To Apply

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    How To Apply How to Apply for Computer System, Cluster, and Networking Summer Institute Emphasizes practical skills development Contacts Program Lead Carolyn Connor (505) 665-9891 Email Professional Staff Assistant Nickole Aguilar Garcia (505) 665-3048 Email The 2016 application process will commence January 5 through February 13, 2016. Applicants must be U.S. citizens. Required Materials Current resume Official university transcript (with Spring courses posted and/or a copy of Spring 2016

  19. Portland Advancing Green Image With Solar Installs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Portland Advancing Green Image With Solar Installs Portland Advancing Green Image With Solar Installs February 22, 2010 - 12:10pm Addthis Laura Smoyer checks the net-metering device in her home, which now uses the sun for about 38 percent of its total energy use. | Department of Energy Photo | Laura Smoyer checks the net-metering device in her home, which now uses the sun for about 38 percent of its total energy use. | Department of Energy Photo | Joshua DeLung A quick Web search reveals that

  20. The Draugen platform and subsea structures, installation and foundation aspects

    SciTech Connect (OSTI)

    Alm, T.; Bye, A.; Sandvik, K.; Egeland, S.

    1995-12-01

    Installation data from the Draugen GBS and subsea structures have been processed and analyzed in order to verify the design assumptions with regards to soil reactions. These results have shown that penetration of concrete skirts and piles into the very hard clay layer, typically found at the Haltenbanken area is feasible. The resistances may be predicted with reasonable accuracy using conventional methods and average soil strength values as obtained by traditional soil testing. This paper reveals and comments the installation data both for the gravity platform and the piles for the different subsea structures and provides and updated basis for foundation design of similar structures in the area.

  1. Apply for Beamtime

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Apply for Beamtime Apply for Beamtime Print Friday, 28 August 2009 13:23 Available Beamlines Determine which ALS beamlines are suitable for your experiment. To do this, you can review the ALS Beamlines Directory, contact the appropriate beamline scientist listed on the Directory, and/or contact the This e-mail address is being protected from spambots. You need JavaScript enabled to view it . Log In to the ALSHub user portal ALSHub Login For More Information About the Types of Proposals To learn

  2. Analysis of Bright Harvest Remote Analysis for Residential Solar Installations

    SciTech Connect (OSTI)

    Nangle, John; Simon, Joseph

    2015-06-17

    Bright Harvest provides remote shading analysis and design products for residential PV system installers. The National Renewable Energy Laboratory (NREL) through the NREL Commercialization Assistance Program, completed comparative assessments between on-site measurements and remotely calculated values to validate the accuracy of Bright Harvest’s remote shading and power generation.

  3. T-729: Mozilla Code Installation Through Holding Down Enter

    Broader source: Energy.gov [DOE]

    Attackers can exploit this issue by enticing an unsuspecting victim into viewing and interacting with a malicious Web page. An attacker may be able to exploit this issue to bypass a confirmation dialog and install an arbitrary add-on. This may aid in further attacks.

  4. Vets company installing solar across Massachusetts

    Broader source: Energy.gov [DOE]

    Dan Leary, a U.S. Army veteran, is president of Nexamp Inc., a clean energy company that specializes in solar installation. Dan founded the company in 2006 and has witnessed its impressive growth from six employees to 65 and counting as of July 2010.

  5. Solar photovoltaic applications seminar: design, installation and operation of small, stand-alone photovoltaic power systems

    SciTech Connect (OSTI)

    Not Available

    1980-07-01

    This seminar material was developed primarily to provide solar photovoltaic (PV) applied engineering technology to the Federal community. An introduction to photoconductivity, semiconductors, and solar photovoltaic cells is included along with a demonstration of specific applications and application identification. The seminar details general systems design and incorporates most known information from industry, academia, and Government concerning small solar cell power system design engineering, presented in a practical and applied manner. Solar PV power system applications involve classical direct electrical energy conversion and electric power system analysis and synthesis. Presentations and examples involve a variety of disciplines including structural analysis, electric power and load analysis, reliability, sizing and optimization; and, installation, operation and maintenance. Four specific system designs are demonstrated: water pumping, domestic uses, navigational and aircraft aids, and telecommunications. All of the applications discussed are for small power requirement (under 2 kilowatts), stand-alone systems to be used in remote locations. Also presented are practical lessons gained from currently installed and operating systems, problems at sites and their resolution, a logical progression through each major phase of system acquisition, as well as thorough design reviews for each application.

  6. Evaluation of Trenchless Installation Technology for Radioactive Wastewater Piping Applications

    SciTech Connect (OSTI)

    Robinson, Sharon M; Jubin, Robert Thomas; Patton, Bradley D; Sullivan, Nicholas M; Bugbee, Kathy P

    2009-09-01

    The U.S. Department of Energy (DOE) Office of Environmental Management (EM) cleanup mission at Oak Ridge National Laboratory (ORNL) includes dispositioning facilities, contaminated legacy materials/waste, and contamination sources and remediation of soil under facilities, groundwater, and surface water to support final Records of Decision (RODs). The Integrated Facilities Disposition Project (IFDP) is a roughly $15B project for completion of the EM mission at Oak Ridge, with a project duration of up to 35 years. The IFDP Mission Need Statement - Critical Decision-0 (CD-0) - was approved by DOE in July 2007, and the IFDP Alternative Selection and Cost Range - Critical Decision-1 (CD-1) - was approved in November 2008. The IFDP scope includes reconfiguration of waste collection and treatment systems as needed to complete the IFDP remediation and decontamination and decommissioning (D&D) missions in a safe and cost-effective manner while maintaining compliance with all governing regulations and bodies and preserving the support of continuing operations at ORNL. A step in the CD-1 approval process included an external technical review (ETR) of technical approaches proposed in the CD-1 document related to the facility reconfiguration for the ORNL radioactive waste and liquid low-level waste management systems. The ETR team recommended that the IFDP team consider the use of trenchless technologies for installing pipelines underground in and around contaminated sites as part of the alternatives evaluations required in support of the CD-2 process. The team specifically recommended evaluating trenchless technologies for installing new pipes in existing underground pipelines as an alternative to conventional open trench installation methods. Potential benefits could include reduction in project costs, less costly underground piping, fewer disruptions of ongoing and surface activities, and lower risk for workers. While trenchless technologies have been used extensively in the sanitary sewer and natural gas pipeline industries, they have been used far less in contaminated environments. Although trenchless technologies have been used at ORNL in limited applications to install new potable water and gas lines, the technologies have not been used in radioactive applications. This study evaluates the technical risks, benefits, and economics for installing gravity drained and pressurized piping using trenchless technologies compared to conventional installation methods for radioactive applications under ORNL geological conditions. A range of trenchless installation technologies was reviewed for this report for general applicability for replacing existing contaminated piping and/or installing new pipelines in potentially contaminated areas. Installation methods that were determined to have potential for use in typical ORNL contaminated environments were then evaluated in more detail for three specific ORNL applications. Each feasible alternative was evaluated against the baseline conventional open trench installation method using weighted criteria in the areas of environment, safety, and health (ES&H); project cost and schedule; and technical operability. The formulation of alternatives for evaluation, the development of selection criteria, and the scoring of alternatives were performed by ORNL staff with input from vendors and consultants. A description of the evaluation methodology and the evaluation results are documented in the following sections of this report.

  7. Applied Studies and Technology (AS&T) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Applied Studies and Technology (AS&T) Applied Studies and Technology (AS&T) Applied Studies and Technology (AS&T) DOE established the Environmental Sciences Laboratory (ESL) in Grand Junction, Colorado, in 1991 to support its programs. ESL scientists perform applied research and laboratory-scale demonstrations of soil and groundwater remediation and treatment technologies. Capabilities Installation, monitoring, and operation of permeable reactive barriers Research of permeable

  8. Information Science, Computing, Applied Math

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Information Science, Computing, Applied Math science-innovationassetsimagesicon-science.jpg Information Science, Computing, Applied Math National security depends on science ...

  9. EA-1655: Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition, Installation and Use for Research and Development

    Broader source: Energy.gov [DOE]

    Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition, Installation and Use for Research and Development

  10. Applied Cathode Enhancement and

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Applied Cathode Enhancement and Robustness Technologies (ACERT) Team Our project team, a part of Los Alamos National Laboratory (LANL) comprised of world leading experts from fields of accelerator design & testing, chemical synthesis of nanomaterials (quantum dots), and shielding application of nanomaterials (graphene and other atomically-thin sheets). Our goal is to develop and demonstrate 'designer' cold cathode electron sources with tunable parameters (bandgap, efficiency, optical

  11. Applied Computer Science

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 Applied Computer Science Innovative co-design of applications, algorithms, and architectures in order to enable scientific simulations at extreme scale Leadership Group Leader Linn Collins Email Deputy Group Leader (Acting) Bryan Lally Email Climate modeling visualization Results from a climate simulation computed using the Model for Prediction Across Scales (MPAS) code. This visualization shows the temperature of ocean currents using a green and blue color scale. These colors were

  12. Impact of Installation Faults on Heat Pump Performance

    SciTech Connect (OSTI)

    Hourahan, Glenn; Baxter, Van D.

    2015-01-01

    Numerous studies and surveys indicate that typically-installed HVAC equipment operate inefficiently and waste considerable energy due to varied installation errors (faults) such as improper refrigerant charge, incorrect airflow, oversized equipment, and leaky ducts. This article summarizes the results of a large United States (U.S.) experimental/analytical study (U.S. contribution to IEA HPP Annex 36) of the impact that different faults have on the performance of an air-source heat pump (ASHP) in a typical U.S. single-family house. It combines building effects, equipment effects, and climate effects in an evaluation of the faults impact on seasonal energy consumption through simulations of the house/ASHP pump system.

  13. Safety assessment of discharge chute isolation barrier preparation and installation

    SciTech Connect (OSTI)

    Meichle, R.H.

    1994-10-21

    This analysis examines activities associated with the installation of isolation barriers in the K Basins at the Hanford Reservation. This revision adds evaluation of barrier drops on stored fuel and basin floor, identifies fuel which will be moved and addresses criticality issues with sludge. The safety assessment is made for the activities for the preparation and installation of the discharge chute isolation barriers. The safety assessment includes a hazard assessment and comparisons of potential accidents/events to those addressed by the current safety basis documentation. No significant hazards were identified. An evaluation against the USQ evaluation questions was made and the determination made that the activities do not represent a USQ. Hazard categorization techniques were used to provide a basis for readiness review classifications.

  14. Impact of Installation Faults on Heat Pump Performance

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Hourahan, Glenn; Baxter, Van D.

    2015-01-01

    Numerous studies and surveys indicate that typically-installed HVAC equipment operate inefficiently and waste considerable energy due to varied installation errors (faults) such as improper refrigerant charge, incorrect airflow, oversized equipment, and leaky ducts. This article summarizes the results of a large United States (U.S.) experimental/analytical study (U.S. contribution to IEA HPP Annex 36) of the impact that different faults have on the performance of an air-source heat pump (ASHP) in a typical U.S. single-family house. It combines building effects, equipment effects, and climate effects in an evaluation of the faults impact on seasonal energy consumption through simulations of the house/ASHPmore » pump system.« less

  15. Idaho National Engineering Laboratory installation roadmap document. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1993-05-30

    The roadmapping process was initiated by the US Department of Energy`s office of Environmental Restoration and Waste Management (EM) to improve its Five-Year Plan and budget allocation process. Roadmap documents will provide the technical baseline for this planning process and help EM develop more effective strategies and program plans for achieving its long-term goals. This document is a composite of roadmap assumptions and issues developed for the Idaho National Engineering Laboratory (INEL) by US Department of Energy Idaho Field Office and subcontractor personnel. The installation roadmap discusses activities, issues, and installation commitments that affect waste management and environmental restoration activities at the INEL. The High-Level Waste, Land Disposal Restriction, and Environmental Restoration Roadmaps are also included.

  16. Issue #3: HVAC Proper Installation Energy Savings: Over-Promising or

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Under-Delivering? | Department of Energy 3: HVAC Proper Installation Energy Savings: Over-Promising or Under-Delivering? Issue #3: HVAC Proper Installation Energy Savings: Over-Promising or Under-Delivering? What energy savings are realistically achievable by following quality installation standards for installation, operation, and maintenance of residential HVAC? PDF icon issue3_airflow_charge.pdf PDF icon issue3_hvac_installed.pdf PDF icon issue3_pdi_hvacsys.pdf More Documents &

  17. Open PV Project: Unlocking PV Installation Data (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2012-04-01

    This brochure summarizes the Open PV Project, a collaborative effort of government, industry, and the public to compile a comprehensive database of PV installations in the United States. The brochure outlines the purpose and history of the project as well as the main capabilities and benefits of the online Open PV tool. The brochure also introduces how features of the tool are used, and it describes the sources and characteristics of Open PV's data and data collection processes.

  18. Quadrennial Energy Review: First Installment | Department of Energy

    Energy Savers [EERE]

    Review Fact Sheets Quadrennial Energy Review Fact Sheets Quadrennial Energy Review Fact Sheets The first installment of the QER examines how to modernize our nation's energy infrastructure to promote economic competitiveness, energy security and environmental responsibility, and is focused on energy transmission, storage, and distribution (TS&D), the networks of pipelines, wires, storage, waterways, railroads, and other facilities that form the backbone of our energy system. The QER seeks to

  19. Wind Gains ground, hitting 33 GW of installed capacity

    SciTech Connect (OSTI)

    2010-06-15

    The U.S. currently has 33 GW of installed wind capacity. Wind continues to gain ground, accounting for 42 percent of new capacity additions in the US in 2008.Globally, there are now 146 GW of wind capacity with an impressive and sustained growth trajectory that promises to dominate new generation capacities in many developing countries. The U.S., however, lags many European countries, with wind providing roughly 2 percent of electricity generation.

  20. Solar heating system installed at Jackson, Tennessee. Final report

    SciTech Connect (OSTI)

    1980-10-01

    The solar energy heating system installed at the Coca-Cola Bottling Works in Jackson, Tennessee is described. The system consists of 9480 square feet of Owens-Illinois evacuated tubular solar collectors with attached specular cylindrical reflectors and will provide space heating for the 70,000 square foot production building in the winter, and hot water for the bottle washing equipment the remainder of the year. Component specifications and engineering drawings are included. (WHK)

  1. Safety assessment of discharge chute isolation barrier preparation and installation

    SciTech Connect (OSTI)

    Meichle, R.H.

    1994-09-29

    The safety assessment is made for the activities for the preparation and installation of the discharge chute isolation barriers. The safety assessment includes a hazard assessment and comparison of potential accidents/events to those addressed by the current safety basis documentation. No significant hazards were identified. An evaluation against the USQ evaluation questions were made and the determination made that the activities do not represent a USQ. Hazard categorization techniques were used to provide a basis for readiness review classification.

  2. Summary: The First Installment of the Quadrennial Energy Review

    Energy Savers [EERE]

    Summary: The First Installment of the Quadrennial Energy Review S-36 QER Report: Energy Transmission, Storage, and Distribution Infrastructure | April 2015 QER Report: Energy Transmission, Storage, and Distribution Infrastructure | April 2015 1-1 Chapter I This chapter provides a general introduction to transmission, storage, and distribution (TS&D) infrastructure issues and to the report. It describes why TS&D infrastructure is important to the U.S. energy system. It then covers a set

  3. Applied ALARA techniques

    SciTech Connect (OSTI)

    Waggoner, L.O.

    1998-02-05

    The presentation focuses on some of the time-proven and new technologies being used to accomplish radiological work. These techniques can be applied at nuclear facilities to reduce radiation doses and protect the environment. The last reactor plants and processing facilities were shutdown and Hanford was given a new mission to put the facilities in a safe condition, decontaminate, and prepare them for decommissioning. The skills that were necessary to operate these facilities were different than the skills needed today to clean up Hanford. Workers were not familiar with many of the tools, equipment, and materials needed to accomplish:the new mission, which includes clean up of contaminated areas in and around all the facilities, recovery of reactor fuel from spent fuel pools, and the removal of millions of gallons of highly radioactive waste from 177 underground tanks. In addition, this work has to be done with a reduced number of workers and a smaller budget. At Hanford, facilities contain a myriad of radioactive isotopes that are 2048 located inside plant systems, underground tanks, and the soil. As cleanup work at Hanford began, it became obvious early that in order to get workers to apply ALARA and use hew tools and equipment to accomplish the radiological work it was necessary to plan the work in advance and get radiological control and/or ALARA committee personnel involved early in the planning process. Emphasis was placed on applying,ALARA techniques to reduce dose, limit contamination spread and minimize the amount of radioactive waste generated. Progress on the cleanup has,b6en steady and Hanford workers have learned to use different types of engineered controls and ALARA techniques to perform radiological work. The purpose of this presentation is to share the lessons learned on how Hanford is accomplishing radiological work.

  4. Empirically Derived Strength of Residential Roof Structures for Solar Installations.

    SciTech Connect (OSTI)

    Dwyer, Stephen F.; Sanchez, Alfred; Campos, Ivan A.; Gerstle, Walter H.

    2014-12-01

    Engineering certification for the installation of solar photovoltaic (PV) modules on wood roofs is often denied because existing wood roofs do not meet structural design codes. This work is intended to show that many roofs are actually sufficiently strong given the conservatism in codes, documented allowable strengths, roof structure system effects, and beam composite action produced by joist-sheathing interaction. This report provides results from a testing program to provide actual load carrying capacity of residential rooftops. The results reveal that the actual load carrying capacity of structural members and systems tested are significantly stronger than allowable loads provided by the International Residential Code (IRC 2009) and the national structural code found in Minimum Design Loads for Buildings and Other Structures (ASCE 7-10). Engineering analysis of residential rooftops typically ignores the system affects and beam composite action in determining rooftop stresses given a potential PV installation. This extreme conservatism combined with conservatism in codes and published allowable stress values for roof building materials (NDS 2012) lead to the perception that well built homes may not have adequate load bearing capacity to enable a rooftop PV installation. However, based on the test results presented in this report of residential rooftop structural systems, the actual load bearing capacity is several times higher than published values (NDS 2012).

  5. Design and installation manual for thermal energy storage

    SciTech Connect (OSTI)

    Cole, R L; Nield, K J; Rohde, R R; Wolosewicz, R M

    1980-01-01

    The purpose of this manual is to provide information on the design and installation of thermal energy storage in active solar systems. It is intended for contractors, installers, solar system designers, engineers, architects, and manufacturers who intend to enter the solar energy business. The reader should have general knowledge of how solar heating and cooling systems operate and knowledge of construction methods and building codes. Knowledge of solar analysis methods such as f-Chart, SOLCOST, DOE-1, or TRNSYS would be helpful. The information contained in the manual includes sizing storage, choosing a location for the storage device, and insulation requirements. Both air-based and liquid-based systems are covered with topics on designing rock beds, tank types, pump and fan selection, installation, costs, and operation and maintenance. Topics relevant to latent heat storage include properties of phase-change materials, sizing the storage unit, insulating the storage unit, available systems, and cost. Topics relevant to heating domestic water include safety, single- and dual-tank systems, domestic water heating with air- and liquid-based space heating systems, and stand alone domestics hot water systems. Several appendices present common problems with storage systems and their solutions, heat transfer fluid properties, economic insulation thickness, heat exchanger sizing, and sample specifications for heat exchangers, wooden rock bins, steel tanks, concrete tanks, and fiberglass-reinforced plastic tanks.

  6. Field installation proves coiled tubing ESP completions successful

    SciTech Connect (OSTI)

    Tovar, J.J.; Head, P.; Jordan, R.

    1995-06-01

    Coiled tubing (CT) technology has contributed new and innovative solutions for wells using electrical submersible pumps (ESP). A CT-ESP deployment system was developed as part of a joint industry project to take advantage of this new technology. Ten oil and service companies and the EEC, under the Thermie program, participated in its development. Two main areas were identified to introduce these innovations. The first was deployment and well control. This area has a great impact on the safety and operational aspects of installing and servicing ESPs. The second is cost. As ESPs are considered for new field developments and recompletion of old fields, installation and workover costs play a major role in the selection of completion alternatives. One of the main limitations of ESPs in the past has been the economics of installation and uncertainty about pump life. With focus in these two major areas, a system was successfully produced that offers considerable advantages over existing technologies. The reduction in rig time and equipment cost makes this alternative very attractive for areas where technical and economic obstacles such as live well deployment and high operating cost limit the use of ESP technology. Two field tests have been carried successfully during the development of this system.

  7. Installation and assembly device and method of using

    DOE Patents [OSTI]

    Kolsun, George J.

    1997-01-01

    An installation and assembly device for aligning a first member such as a pump impeller with a second member such as an inlet nozzle of an impeller pump. The installation and assembly device includes a sleeve slideable within the inlet nozzle and a vertical positioning assembly which has a contact member that is extendable out away from the sleeve so as to vertically position the sleeve on a shoulder of the inlet nozzle and to present an upper contact surface spaced a certain distance from the shoulder to provide the desired vertical spacing with respect to the impeller contacting the upper contact surface. The vertical positioning assembly is retractable so as to allow for removal of the sleeve through the nozzle when installation and assembly are completed. The alignment device also includes a radial alignment assembly supported by the sleeve and adjustable to an expanded state for contacting and spacing the interior surface of the impeller a certain distance from the sleeve and hence a certain distance from the inlet nozzle. The radial alignment device being adjustable from a retracted removal state to an expanded state and also being adjustable to fine tune the spacing of the impeller from the sleeve. The radial alignment device also preferably includes members that can be used to releasably secure the sleeve to the impeller.

  8. Apply for Beamtime

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Apply for Beamtime Print Available Beamlines Determine which ALS beamlines are suitable for your experiment. To do this, you can review the ALS Beamlines Directory, contact the appropriate beamline scientist listed on the Directory, and/or contact the This e-mail address is being protected from spambots. You need JavaScript enabled to view it . Log In to the ALSHub user portal ALSHub Login For More Information About the Types of Proposals To learn more about the three different types of

  9. Apply for Beamtime

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Apply for Beamtime Print Available Beamlines Determine which ALS beamlines are suitable for your experiment. To do this, you can review the ALS Beamlines Directory, contact the appropriate beamline scientist listed on the Directory, and/or contact the This e-mail address is being protected from spambots. You need JavaScript enabled to view it . Log In to the ALSHub user portal ALSHub Login For More Information About the Types of Proposals To learn more about the three different types of

  10. Acquired experience resulting from transforming a chemical installation into a nuclear one

    SciTech Connect (OSTI)

    Zamfirache, M.; Stefan, L.; Bornea, A.; Stefanescu, I.

    2015-03-15

    ICIT-Valcea has developed an experimental pilot-scale installation for tritium and deuterium separation. The main objective of this pilot was to demonstrate the water detritiation technology and to transfer this technology to the CANDU reactors of the Cernavoda nuclear power plant. The pilot-scale installation was initiated in 1992. The initial design and construction were performed similarly to chemical plants as the separation of isotopes was focused on only hydrogen and deuterium to assess feasibility. In a second phase we have begun to transform it into a nuclear facility with the aim of separating tritium. Moving to tritium separation has imposed a lot of changes. Changes consisted mainly of: -) re-design of the technological systems for nuclear material processing, applying specific codes and standards (ASME, Romanian nuclear specific pressure boundary prescriptions for code classification); -) design and implementation of new systems, classified as safety systems; -) re-design and implementation of command and control systems, complying with the requirements of reliability and maintenance required for the project promoted; -) revaluation of auxiliary systems (utilities, power supply); -) implementing radiation protection systems, including secondary barriers; -) implementing and maintaining environment operational program specific to the new nuclear plant; -) developing and conducting safety analyzes; and -) the production of specific documentation to obtain the necessary permits for construction, commissioning and operation of the plant.

  11. SunShot Prize: America's Most Affordable Rooftop Solar: A Competition To Spur Low-Cost Rooftop Solar Installations Across The Nation (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2012-06-01

    The SunShot Prize encourages novel public-private partnerships, original business models, and innovative approaches to installing clean, renewable solar energy. The sustainable business strategies developed by participants will provide transferable lessons that can be applied nationwide to hasten America's transition to affordable clean energy in a post-subsidy market.

  12. ORISE: Applied health physics projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Applied health physics projects The Oak Ridge Institute for Science and Education (ORISE) provides applied health physics services to government agencies needing technical support ...

  13. Implementation of Army privatization directives at Forscom installations

    SciTech Connect (OSTI)

    Armstrong, R.C.; Patwardhan, S.

    1997-06-01

    {open_quotes}Privatization{close_quotes} has become the buzzword of the 1990s not only here in the United States but throughout the world. Privatization has been traditionally defined as the sale/transfer of state-owned (i.e. federal, state, county, city or public) assets to the private sector. Although there are numerous reasons for the privatization of state-owned assets, the primary reasons include the generation of a significant amount of cash to the state (Great Britain`s sale of electric power industry); capitalization of the formerly state-owned utility (sale of the utilities within many countries of the former Soviet Union); and state policy goals of eliminating monopolies, encouraging competition, and restructuring (Chile). Several year ago, the Department of Defense (DoD) and specifically the Department of Army (DoA) initiated its own `Privatization Process`. Coupled with shrinking budgets, workforce and funding resources from the Government, the Army was faced with antiquated utility infrastructure in need of significant upgrades and in some cases total replacements. Recognizing that the provision of utility services was not a core mission of the Army, DoA has encouraged its Installations throughout the country to consider the privatization of the Government-owned utility systems. In compliance with DoA policy, Forces Command (FORSCOM) has been at the forefront of the privatization process. To date, FORSCOM has initiated the process of analyzing the potential privatization of over 30 utility systems at 12 FORSCOM Installations located throughout the country. The FORSCOM Installations include Fort Irwin, CA; Fort Campbell, KY; Fort Bragg, NC; Fort McPherson, GA; Fort Hood, TX; Fort Polk, LA; Fort Lewis, WA; Fort Riley, KS; Fort Stewart, GA; Hunter Army Airfield, GA; Fort Carson, CO; Fort Devens, MA; Fort Dix, NJ; and Fort Gillem, GA.

  14. Automated solar collector installation design including ability to define heterogeneous design preferences

    DOE Patents [OSTI]

    Wayne, Gary; Frumkin, Alexander; Zaydman, Michael; Lehman, Scott; Brenner, Jules

    2014-04-29

    Embodiments may include systems and methods to create and edit a representation of a worksite, to create various data objects, to classify such objects as various types of pre -defined "features" with attendant properties and layout constraints. As part of or in addition to classification, an embodiment may include systems and methods to create, associate, and edit intrinsic and extrinsic properties to these objects. A design engine may apply of design rules to the features described above to generate one or more solar collectors installation design alternatives, including generation of on-screen and/or paper representations of the physical layout or arrangement of the one or more design alternatives. Embodiments may also include definition of one or more design apertures, each of which may correspond to boundaries in which solar collector layouts should comply with distinct sets of user-defined design preferences. Distinct apertures may provide heterogeneous regions of collector layout according to the user-defined design preferences.

  15. Automated solar collector installation design including ability to define heterogeneous design preferences

    DOE Patents [OSTI]

    Wayne, Gary; Frumkin, Alexander; Zaydman, Michael; Lehman, Scott; Brenner, Jules

    2013-01-08

    Embodiments may include systems and methods to create and edit a representation of a worksite, to create various data objects, to classify such objects as various types of pre-defined "features" with attendant properties and layout constraints. As part of or in addition to classification, an embodiment may include systems and methods to create, associate, and edit intrinsic and extrinsic properties to these objects. A design engine may apply of design rules to the features described above to generate one or more solar collectors installation design alternatives, including generation of on-screen and/or paper representations of the physical layout or arrangement of the one or more design alternatives. Embodiments may also include definition of one or more design apertures, each of which may correspond to boundaries in which solar collector layouts should comply with distinct sets of user-defined design preferences. Distinct apertures may provide heterogeneous regions of collector layout according to the user-defined design preferences.

  16. Study on the financing mechanism and management for decommissioning of nuclear installations in Malaysia

    SciTech Connect (OSTI)

    Saleh, Lydia Ilaiza Ryong, Kim Tae

    2015-04-29

    The whole cycle of the decommissioning process development of repository requires the relevant bodies to have a financial system to ensure that it has sufficient funds for its whole life cycle (over periods of many decades). Therefore, the financing mechanism and management system shall respect the following status: the national position, institutional and legislative environment, technical capabilities, the waste origin, ownership, characteristics and inventories. The main objective of the studies is to focus on the cost considerations, alternative funding managements and mechanisms, technical and non-technical factors that may affect the repository life-cycle costs. As a conclusion, the outcomes of this paper is to make a good recommendation and could be applied to the national planners, regulatory body, engineers, or the managers, to form a financial management plan for the decommissioning of the Nuclear Installation.

  17. Oil/gas separator for installation at burning wells

    DOE Patents [OSTI]

    Alonso, Carol T.; Bender, Donald A.; Bowman, Barry R.; Burnham, Alan K.; Chesnut, Dwayne A.; Comfort, III, William J.; Guymon, Lloyd G.; Henning, Carl D.; Pedersen, Knud B.; Sefcik, Joseph A.; Smith, Joseph A.; Strauch, Mark S.

    1993-01-01

    An oil/gas separator is disclosed that can be utilized to return the burning wells in Kuwait to production. Advantageously, a crane is used to install the separator at a safe distance from the well. The gas from the well is burned off at the site, and the oil is immediately pumped into Kuwait's oil gathering system. Diverters inside the separator prevent the oil jet coming out of the well from reaching the top vents where the gas is burned. The oil falls back down, and is pumped from an annular oil catcher at the bottom of the separator, or from the concrete cellar surrounding the well.

  18. Oil/gas separator for installation at burning wells

    DOE Patents [OSTI]

    Alonso, C.T.; Bender, D.A.; Bowman, B.R.; Burnham, A.K.; Chesnut, D.A.; Comfort, W.J. III; Guymon, L.G.; Henning, C.D.; Pedersen, K.B.; Sefcik, J.A.; Smith, J.A.; Strauch, M.S.

    1993-03-09

    An oil/gas separator is disclosed that can be utilized to return the burning wells in Kuwait to production. Advantageously, a crane is used to install the separator at a safe distance from the well. The gas from the well is burned off at the site, and the oil is immediately pumped into Kuwait's oil gathering system. Diverters inside the separator prevent the oil jet coming out of the well from reaching the top vents where the gas is burned. The oil falls back down, and is pumped from an annular oil catcher at the bottom of the separator, or from the concrete cellar surrounding the well.

  19. Key issues for low-cost FGD installations

    SciTech Connect (OSTI)

    DePriest, W.; Mazurek, J.M.

    1995-12-01

    This paper will discuss various methods for installing low-cost FGD systems. The paper will include a discussion of various types of FGD systems available, both wet and dry, and will compare the relative cost of each type. Important design issues, such as use of spare equipment, materials of construction, etc. will be presented. An overview of various low-cost construction techniques (i.e., modularization) will be included. This paper will draw heavily from Sargent & Lundy`s database of past and current FGD projects together with information we gathered for several Electric Power Research Institute (EPRI) studies on the subject.

  20. Toolkit for Installing Solar on K-12 Schools

    Broader source: Energy.gov [DOE]

    Following the release of The Solar Foundation's Brighter Future: A Study on Solar in U.S. Schools under the Solar Outreach Partnership, the organization has been working to help more K-12 public schools go solar through its technical assistance program. As part of this effort, they developed the Toolkit for Installing Solar on K-12 Schools to compile new and existing resources, designed to provide public school officials with a starting point for pursuing their own solar projects. Hands-on guidance in putting the ideas contained within this toolkit into action is available through the SolarOPs Technical Assistance program.

  1. Excavation roof support and method of installing the same

    SciTech Connect (OSTI)

    Bohnes, K.; Fitzgerald, H.J.; Koppers, M.

    1981-07-07

    A method and a system are disclosed for supporting an overburden. A single-section or telescoped multi-section longitudinally slit prop casing of light sheet material such as cardboard or metal has a fabric bag installed in it. When the casing is erected the bag is filled with a slurry of hardenable substance which, upon hardening, forms in the bag a column which supports the overburden. The casing may be left in place or it may be removed for re-use.

  2. Graduate students from two British universities install a critical new

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    diagnostic on NSTX-U | Princeton Plasma Physics Lab Graduate students from two British universities install a critical new diagnostic on NSTX-U By John Greenwald December 21, 2015 Tweet Widget Google Plus One Share on Facebook David Thomas and Jakob Brunner (Photo by Elle Starkman/Office of Communications) David Thomas and Jakob Brunner Gallery: From left: Jakob Brunner and David Thomas, with advisor Prof. Roddy Vann of the University of York on the screen in the center. (Photo by Elle

  3. Graduate students from two British universities install a critical new

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    diagnostic on NSTX-U | Princeton Plasma Physics Lab Graduate students from two British universities install a critical new diagnostic on NSTX-U By John Greenwald December 21, 2015 Tweet Widget Google Plus One Share on Facebook David Thomas and Jakob Brunner (Photo by Elle Starkman/Office of Communications) David Thomas and Jakob Brunner Gallery: From left: Jakob Brunner and David Thomas, with advisor Prof. Roddy Vann of the University of York on the screen in the center. (Photo by Elle

  4. LANSCE harp upgrade: analysis, design, fabrication and installation

    SciTech Connect (OSTI)

    Gilpatrick, John D; Chacon, Phillip; Martinez, Derwin; Power, John F; Smith, Brian G; Taylor, Mark A; Gruchalla, Mike

    2010-01-01

    The primary goal of this newly installed beam profile measurement is to provide the facility operators and physicists with a reliable horizontal and vertical projected beam distribution and location with respect to the proton beam target and beam aperture. During a 3000-hour annual run cycle, 5 {mu}C of charge is delivered every 50 milliseconds through this harp to the downstream TRMS Mark III target. The resulting radioactive annual dose near this harp is at least 6 MGy. Because of this harsh environment, the new harp design has been further optimized for robustness. For example, compared to an earlier design, this harp has half of the sensing wires and utilizes only a single bias plane. The sensing fibers are 0.079-mm diameter SiC fibers. To hold these fibers to a rigid ceramic structure, a collet fiber-clamping device accomplishes the three goals of maintaining a mechanical fiber clamp, holding the sense fibers under a slight tensile force, and providing a sense-fiber electrical connection. This paper describes the harp analysis and design, and provides fabrication, assembly, and some installation information, and discusses wiring alterations.

  5. NEPA mitigation and monitoring activities on Army installations

    SciTech Connect (OSTI)

    Reinke, D.C.; Robitaille, P.

    1995-12-01

    The Army National Environmental Policy Act (NEPA) implementation regulation AR 200-2 (Army Regulation) requires only mitigation measures that can reasonably be accompanied as part of a proposed alternative be identified in the NEPA document. Failure of the identified mitigation actions to be executed or to perform as expected leads to a required reevaluation of the project and the significance of its impacts. The USAEC has undertaken a study of mitigation and monitoring actions listed in Army NEPA documents. As part of the USAEC NEPA program the study has outlined three major tasks (1) collection of a significant sample of Army NEPA documents, (2) review environmental documentation management and retention, and (3) review in detail a subsample of documents and follow-up with site visits. Some 242 Army NEPA documents, Environmental Assessments (EA) and Environmental Impact Statements (EIS) were collected and evaluated for mitigation requirements. Ninety seven of the 242 NEPA documents committed to one or more mitigation actions. While a wide array of mitigating activities have been identified in these documents, the four most common are (1) management plans and practices, (2) training actions, (3) revegetation actions, and (4) construction practices. Site visits to selected Army installations showed that mitigation practices were for the most part being done, but were poorly documented. No installation visited had a mitigation monitoring plan in place as required by AR 200-2.

  6. Fact #643: October 4, 2010 Four Cylinder Engine Installations Continue to Rise

    Broader source: Energy.gov [DOE]

    The share of 4 cylinder engines installed in light vehicles has been increasing since 2004. Beginning in 2006, cars have shown an increase in 4 cylinder engine installations while 8 cylinder engine...

  7. First U.S. Grid-Connected Offshore Wind Turbine Installed Off...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    First U.S. Grid-Connected Offshore Wind Turbine Installed Off the Coast of Maine First U.S. Grid-Connected Offshore Wind Turbine Installed Off the Coast of Maine October 1, 2013 - ...

  8. NREL and Army Validate Energy Savings for Net Zero Energy Installations -

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    News Releases | NREL NREL and Army Validate Energy Savings for Net Zero Energy Installations Net Zero Energy Installations could save millions a year in energy costs October 27, 2014 The U.S. Army (Army) has partnered with the Energy Department's National Renewable Energy Laboratory (NREL) to increase energy security through improved energy efficiency and optimized renewable energy strategies at nine installations in the Army's portfolio. If all nine of the Army Net Zero Energy Installation

  9. EERE Success Story-Helping Ensure High-Quality Installation of Solar

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Power Technologies | Department of Energy Helping Ensure High-Quality Installation of Solar Power Technologies EERE Success Story-Helping Ensure High-Quality Installation of Solar Power Technologies April 15, 2013 - 12:00am Addthis Lorain County Community College Instructors install PV modules on training roof labs during the Midwest Renewable Energy Association’s Train-the-Trainer PV Instructor Institute course. Lorain County Community College Instructors install PV modules on training

  10. Residential Windows and Window Coverings: A Detailed View of the Installed Base and User Behavior

    Broader source: Energy.gov [DOE]

    Includes information about the installed base of residential windows and window coverings, and the operation of window coverings by households.

  11. EnPI V4.0 Installation and Uninstallation Instructions | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Instructions on how to install or uninstall the EnPI Tool v4.0. PDF icon EnPI Installation and Un-Install Instructions More Documents & Publications EnPI V4.0 User Manual EnPI V3.0 ...

  12. Solar space heating installed at Kansas City, Kansas. Final report

    SciTech Connect (OSTI)

    Not Available

    1981-05-01

    The solar energy system was constructed with the new 48,800 square feet warehouse to heat the warehouse area of about 39,000 square feet while the auxiliary energy system heats the office area of about 9800 square feet. The building is divided into 20 equal units, and each has its own solar system. The modular design permits the flexibility of combining multiple units to form offices or warehouses of various size floor areas as required by a tenant. Each unit has 20 collectors which are mounted in a single row. The collectors, manufactured by Solaron Corporation, are double glazed flat plate collectors with a gross area of 7800 ft/sup 2/. Air is heated either through the collectors or by the electric resistance duct coils. No freeze protection or storage is required for this system. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are included.

  13. Monte Carlo Simulation Tool Installation and Operation Guide

    SciTech Connect (OSTI)

    Aguayo Navarrete, Estanislao; Ankney, Austin S.; Berguson, Timothy J.; Kouzes, Richard T.; Orrell, John L.; Troy, Meredith D.; Wiseman, Clinton G.

    2013-09-02

    This document provides information on software and procedures for Monte Carlo simulations based on the Geant4 toolkit, the ROOT data analysis software and the CRY cosmic ray library. These tools have been chosen for its application to shield design and activation studies as part of the simulation task for the Majorana Collaboration. This document includes instructions for installation, operation and modification of the simulation code in a high cyber-security computing environment, such as the Pacific Northwest National Laboratory network. It is intended as a living document, and will be periodically updated. It is a starting point for information collection by an experimenter, and is not the definitive source. Users should consult with one of the authors for guidance on how to find the most current information for their needs.

  14. Information handbook on independent spent fuel storage installations

    SciTech Connect (OSTI)

    Raddatz, M.G.; Waters, M.D.

    1996-12-01

    In this information handbook, the staff of the U.S. Nuclear Regulatory Commission describes (1) background information regarding the licensing and history of independent spent fuel storage installations (ISFSIs), (2) a discussion of the licensing process, (3) a description of all currently approved or certified models of dry cask storage systems (DCSSs), and (4) a description of sites currently storing spent fuel in an ISFSI. Storage of spent fuel at ISFSIs must be in accordance with the provisions of 10 CFR Part 72. The staff has provided this handbook for information purposes only. The accuracy of any information herein is not guaranteed. For verification or for more details, the reader should refer to the respective docket files for each DCSS and ISFSI site. The information in this handbook is current as of September 1, 1996.

  15. Underground coal operators install several new longwall mining systems

    SciTech Connect (OSTI)

    Fiscor, S.

    2008-02-15

    Several new names appear in the annual US Longwall Census, but the population remains the same: 52 although the number of longwall mines dropped from 40 to 47. CONSOL Energy remains the leader with 12 faces. Robert E. Murray owns 8 longwall mines followed by Arch Coal with 5 and Foundation Coal with 3. West Virginia has 13 longwalls followed by 9 in Pennsylvania, 7 in Utah and 6 in Alabama. The article describes CONSOL Energy's operations. A detailed table gives for each longwall installation, the ownership, seam height, cutting height, panel width and length, overburden, number of gate entries, depth of cut, model of equipment used (shearer, haulage system, roof support, face conveyor, stage loader, crusher, electrical controls and voltage to face). 2 tabs.

  16. Gas turbine nozzle vane insert and methods of installation

    DOE Patents [OSTI]

    Miller, William John; Predmore, Daniel Ross; Placko, James Michael

    2002-01-01

    A pair of hollow elongated insert bodies are disposed in one or more of the nozzle vane cavities of a nozzle stage of a gas turbine. Each insert body has an outer wall portion with apertures for impingement-cooling of nozzle wall portions in registration with the outer wall portion. The insert bodies are installed into the cavity separately and spreaders flex the bodies toward and to engage standoffs against wall portions of the nozzle whereby the designed impingement gap between the outer wall portions of the insert bodies and the nozzle wall portions is achieved. The spreaders are secured to the inner wall portions of the insert bodies and the bodies are secured to one another and to the nozzle vane by welding or brazing.

  17. Safety of Hydrogen Systems Installed in Outdoor Enclosures

    SciTech Connect (OSTI)

    Barilo, Nick F.

    2013-11-06

    The Hydrogen Safety Panel brings a broad cross-section of expertise from the industrial, government, and academic sectors to help advise the U.S. Department of Energys (DOE) Fuel Cell Technologies Office through its work in hydrogen safety, codes, and standards. The Panels initiatives in reviewing safety plans, conducting safety evaluations, identifying safety-related technical data gaps, and supporting safety knowledge tools and databases cover the gamut from research and development to demonstration and deployment. The Panels recent work has focused on the safe deployment of hydrogen and fuel cell systems in support of DOE efforts to accelerate fuel cell commercialization in early market applications: vehicle refueling, material handling equipment, backup power for warehouses and telecommunication sites, and portable power devices. This paper resulted from observations and considerations stemming from the Panels work on early market applications. This paper focuses on hydrogen system components that are installed in outdoor enclosures. These enclosures might alternatively be called cabinets, but for simplicity, they are all referred to as enclosures in this paper. These enclosures can provide a space where a flammable mixture of hydrogen and air might accumulate, creating the potential for a fire or explosion should an ignition occur. If the enclosure is large enough for a person to enter, and ventilation is inadequate, the hydrogen concentration could be high enough to asphyxiate a person who entered the space. Manufacturers, users, and government authorities rely on requirements described in codes to guide safe design and installation of such systems. Except for small enclosures used for hydrogen gas cylinders (gas cabinets), fuel cell power systems, and the enclosures that most people would describe as buildings, there are no hydrogen safety requirements for these enclosures, leaving gaps that must be addressed. This paper proposes that a technical basis be developed to enable code bodies to write requirements for the range of enclosures from the smallest to the largest.

  18. Applied Optoelectronics | Open Energy Information

    Open Energy Info (EERE)

    optical semiconductor devices, packaged optical components, optical subsystems, laser transmitters, and fiber optic transceivers. References: Applied Optoelectronics1...

  19. LED system performance in a trial installation - one year later: Yuma border patrol, Yuma, Arizona

    SciTech Connect (OSTI)

    Wilkerson, Andrea M.; Davis, Robert G.

    2015-04-01

    The Yuma Sector Border Patrol Area is a high temperature and high solar radiation environment, providing an opportunity for the U.S. Department of Energy (DOE) to study thermal effects on outdoor light-emitting diode (LED) luminaires outside of the testing laboratory. Six LED luminaires were installed on three poles on the U.S.- Mexico border in February 2014 as part of a trial installation, which was detailed in a prior GATEWAY report.1 The initial trial installation was intended as a short - term test of six luminaires installed on three poles before proceeding with the complete installation of over 400 luminaires. Unexpected delays in the full installation have prevented the detailed evaluations initially planned, but the six installed LED luminaires continue to be monitored, and over the past year illuminance measurements were recorded initially in February 2014 and again in September 2014 at about 2500 hours of operation and in March 2015 at about 5000 hours of operation.

  20. Alstom 3-MW Wind Turbine Installed at NWTC (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2011-09-01

    The 3-MW Alstom wind turbine was installed at NREL's NWTC in October 2010. Test data will be used to validate advanced turbine design and analysis tools. NREL signed a Cooperative Research and Development Agreement with Alstom in 2010 to conduct certification testing on the company's 3-MW ECO 100 wind turbine and to validate models of Alstom's unique drivetrain concept. The turbine was installed at NREL's National Wind Technology Center (NWTC) in October 2010 and engineers began certification testing in 2011. Tests to be conducted by NREL include a power quality test to finalize the International Electrotechnical Commission (IEC) requirements for type certification of the 60-Hz unit. The successful outcome of this test will enable Alstom to begin commercial production of ECO 100 in the United States. NREL also will obtain additional measurements of power performance, acoustic noise, and system frequency to complement the 50 Hz results previously completed in Europe. After NREL completes the certification testing on the ECO 100, it will conduct long-term testing to validate gearbox performance to gain a better understanding of the machine's unique ALSTOM PURE TORQUE{trademark} drivetrain concept. In conventional wind turbines, the rotor is supported by the shaft-bearing gearbox assembly. Rotor loads are partially transmitted to the gearbox and may reduce gearbox reliability. In the ALSTOM PURE TORQUE concept, the rotor is supported by a cast frame running through the hub, which transfers bending loads directly to the tower. Torque is transmitted to the shaft through an elastic coupling at the front of the hub. According to Alstom, this system will increase wind turbine reliability and reduce operation and maintenance costs by isolating the gearbox from rotor loads. Gearbox reliability has challenged the wind energy industry for more than two decades. Gearbox failures require expensive and time-consuming replacement, significantly increasing the cost of wind plant operation while reducing the plant's power output and revenue. To solve gearbox reliability issues, NREL launched a Gearbox Reliability Collaborative (GRC) in 2006 and brought together the world's leading turbine manufacturers, consultants, and experts from more than 30 companies and organizations. GRC's goal was to validate the typical design process-from wind turbine system loads to bearing ratings-through a comprehensive dynamometer and field-test program. Design analyses will form a basis for improving reliability of future designs and retrofit packages. Through its study of Alstom's Eco 100 gearbox, NREL can compare its GRC model gearbox with Alstom's and add the results to the GRC database, which is helping to advance more reliable wind turbine technology.

  1. Apply

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Unofficial transcripts are acceptable. If transcripts are not in English, provide a translation. If grades are not in the U.S.-traditional lettered (A,B,C), or GPA (out of 4.0)...

  2. Resource Form Factor and Installation of GFA Controllers

    SciTech Connect (OSTI)

    DeSteese, John G.; Hammerstrom, Donald J.

    2009-11-15

    The focus of this task is to optimize the form and placement of a controller comprising the Grid Friendly appliance (GFA) controller, power supply and power relay (and/or a solid-state power electronic switch) that would command a domestic water heater to shed its load in response to stress on the electric power grid. The GFA controller would disconnect the water heater from its supply circuit whenever it senses a low voltage signal or other indicators of system stress communicated via the electric power distribution system. Power would be reconnected to the appliance when the GFA controller senses the absence of these signals. This project has also considered more frequent cycling of this controllers relay switch to perform demand-side frequency regulation. The principal criteria considered in this optimization are reliability, cost and life expectancy of the GFA components. The alternative embodiments of the GFA equipment under consideration are: Option 1- installation inside the insulation space of the water heater between the tank and jacket Option 2 containment in a separate nearby electrical enclosure Option 3 - as a modification or adjunct to the distribution panel housing and/or the breaker that protects the water heater supply circuit.

  3. Field Testing of Thermoplastic Encapsulants in High-Temperature Installations

    SciTech Connect (OSTI)

    Kempe, Michael D.; Miller, David C.; Wohlgemuth, John H.; Kurtz, Sarah R.; Moseley, John M.; Shah, Qurat A.; Tamizhmani, Govindasamy; Sakurai, Keiichiro; Inoue, Masanao; Doi, Takuya; Masuda, Atsushi; Samuels, Sam L.; Vanderpan, Crystal E.

    2015-11-01

    Recently there has been increased interest in using thermoplastic encapsulant materials in photovoltaic modules, but concerns have been raised about whether these would be mechanically stable at high temperatures in the field. This has become a significant topic of discussion in the development of IEC 61730 and IEC 61215. We constructed eight pairs of crystalline-silicon modules and eight pairs of glass/encapsulation/glass thin-film mock modules using different encapsulant materials, of which only two were formulated to chemically crosslink. One module set was exposed outdoors with thermal insulation on the back side in Mesa, Arizona, in the summer (hot-dry), and an identical module set was exposed in environmental chambers. High-precision creep measurements (±20 μm) and electrical performance measurements indicate that despite many of these polymeric materials operating in the melt or rubbery state during outdoor deployment, no significant creep was seen because of their high viscosity, lower operating temperature at the edges, and/or the formation of chemical crosslinks in many of the encapsulants with age despite the absence of a crosslinking agent. Only an ethylene-vinyl acetate (EVA) encapsulant formulated without a peroxide crosslinking agent crept significantly. When the crystalline-silicon modules, the physical restraint of the backsheet reduced creep further and was not detectable even for the EVA without peroxide. Because of the propensity of some polymeric materials to crosslink as they age, typical thermoplastic encapsulants would be unlikely to result in creep in the vast majority of installations.

  4. Applied Materials | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search Name: Applied Materials Address: 3050 Bowers Avenue Place: Santa Clara, California Zip: 95054 Sector: Solar Website: www.appliedmaterials.com...

  5. Expert Meeting Report: Achieving the Best Installed Performance from High-Efficiency Residential Gas Furnaces

    SciTech Connect (OSTI)

    Brand, Larry

    2012-03-01

    This report describes a Building America expert meeting hosted on July 28, 2011, by the Partnership for Advanced Residential Retrofit (PARR) team. The purpose of this meeting was to identify installation practices that provide the best installed efficiency for residential gas furnaces, explain how AFUE and field efficiency can differ, and investigate the impact of installation practices on the efficiency and long-term durability of the furnace.

  6. Install Waste Heat Recovery Systems for Fuel-Fired Furnaces | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Waste Heat Recovery Systems for Fuel-Fired Furnaces Install Waste Heat Recovery Systems for Fuel-Fired Furnaces This tip sheet recommends installing waste heat recovery systems for fuel-fired furnaces to increase the energy efficiency of process heating systems. PROCESS HEATING TIP SHEET #8 PDF icon Install Waste Heat Recovery Systems for Fuel-Fired Furnaces (September 2005) More Documents & Publications Load Preheating Using Flue Gases from a Fuel-Fired Heating System Using Waste

  7. Reviewing Post-Installation and Annual Reports for Federal ESPC Projects |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Reviewing Post-Installation and Annual Reports for Federal ESPC Projects Reviewing Post-Installation and Annual Reports for Federal ESPC Projects The purpose of this document is to provide a framework for implementing uniform and consistent reviews of post-installation and annual reports for federal ESPC projects. These procedures will allow for consistent evaluations of performance reports, produce standardized reviews, and enable centralized tracking of ongoing project

  8. Post-Installation Report Outline (IDIQ Attachment J-9) | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Installation Report Outline (IDIQ Attachment J-9) Post-Installation Report Outline (IDIQ Attachment J-9) Document offers a post-installation report outline sample for an energy savings performance contract. Microsoft Office document icon mv_post_report.doc More Documents & Publications Measurement and Verification Plan and Savings Calculations Methods Outline (IDIQ Attachment J-8) Annual Report Outline (IDIQ Attachment J-10) ESPC Task Order Financial Schedules (IDIQ Attachment

  9. Database (Report) of U.S. CHP Installations Incorporating Thermal Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Storage (TES) and/or Turbine Inlet Cooling (TIC), 2004 | Department of Energy Database (Report) of U.S. CHP Installations Incorporating Thermal Energy Storage (TES) and/or Turbine Inlet Cooling (TIC), 2004 Database (Report) of U.S. CHP Installations Incorporating Thermal Energy Storage (TES) and/or Turbine Inlet Cooling (TIC), 2004 The primary objective of this project was to develop a database of combined heat and power (CHP) installations incorporating TES and/or TIC systems, throughout

  10. Building America Expert Meeting: Achieving the Best Installed Performance from High-Efficiency Residential Gas Furnaces

    Broader source: Energy.gov [DOE]

    This report describes a Building America expert meeting hosted on July 28, 2011, by the Partnership for Advanced Residential Retrofit team. The purpose of this meeting was to identify installation practices that provide the best installed efficiency for residential gas furnaces, explain how AFUE and field efficiency can differ, and investigate the impact of installation practices on the efficiency and long-term durability of the furnace.

  11. U.S. CHP Installations Incorporating Thermal Energy Storage (TES) and/or

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Turbine Inlet Cooling (TIC), September 2003 | Department of Energy CHP Installations Incorporating Thermal Energy Storage (TES) and/or Turbine Inlet Cooling (TIC), September 2003 U.S. CHP Installations Incorporating Thermal Energy Storage (TES) and/or Turbine Inlet Cooling (TIC), September 2003 This 2003 chart of U.S. CHP installations incorporating Thermal Energy Storage (TES) and/or Turbine Inlet Cooling (TIC) was prepared by the Cool Solutions Company of Lisle, Illinois, for UT-Battelle,

  12. Net Zero Energy Military Installations: A Guide to Assessment and Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Net Zero Energy Military Installations: A Guide to Assessment and Planning Net Zero Energy Military Installations: A Guide to Assessment and Planning In 2008, DoD and DOE defined a joint initiative to address military energy use by identifying specific actions to reduce energy demand and increase use of renewable energy on DoD installations. PDF icon 48876.pdf More Documents & Publications Lessons Learned from Net Zero Energy Assessments and Renewable Energy

  13. EERE Success Story-Plug and Play: Purchase, Install, and Connect

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Residential Solar Power in Hours | Department of Energy Plug and Play: Purchase, Install, and Connect Residential Solar Power in Hours EERE Success Story-Plug and Play: Purchase, Install, and Connect Residential Solar Power in Hours March 16, 2015 - 5:58pm Addthis Fraunhofer CSE demonstrates Plug and Play PV System installation and commissioning in just 75 minutes at the Massachusetts Clean Energy Center’s Wind Technology Testing Center. Photo Credit: Fraunhofer CSE Fraunhofer CSE

  14. Field Testing of Thermoplastic Encapsulants in High-Temperature Installations

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Kempe, Michael D.; Miller, David C.; Wohlgemuth, John H.; Kurtz, Sarah R.; Moseley, John M.; Shah, Qurat A.; Tamizhmani, Govindasamy; Sakurai, Keiichiro; Inoue, Masanao; Doi, Takuya; et al

    2015-11-01

    Recently there has been increased interest in using thermoplastic encapsulant materials in photovoltaic modules, but concerns have been raised about whether these would be mechanically stable at high temperatures in the field. This has become a significant topic of discussion in the development of IEC 61730 and IEC 61215. We constructed eight pairs of crystalline-silicon modules and eight pairs of glass/encapsulation/glass thin-film mock modules using different encapsulant materials, of which only two were formulated to chemically crosslink. One module set was exposed outdoors with thermal insulation on the back side in Mesa, Arizona, in the summer (hot-dry), and an identicalmore » module set was exposed in environmental chambers. High-precision creep measurements (±20 μm) and electrical performance measurements indicate that despite many of these polymeric materials operating in the melt or rubbery state during outdoor deployment, no significant creep was seen because of their high viscosity, lower operating temperature at the edges, and/or the formation of chemical crosslinks in many of the encapsulants with age despite the absence of a crosslinking agent. Only an ethylene-vinyl acetate (EVA) encapsulant formulated without a peroxide crosslinking agent crept significantly. When the crystalline-silicon modules, the physical restraint of the backsheet reduced creep further and was not detectable even for the EVA without peroxide. Because of the propensity of some polymeric materials to crosslink as they age, typical thermoplastic encapsulants would be unlikely to result in creep in the vast majority of installations.« less

  15. Design and Installation of a Disposal Cell Cover Field Test

    SciTech Connect (OSTI)

    Benson, C.H. [University of WisconsinMadison, Madison, Wisconsin; Waugh, W.J. [S.M. Stoller Corporation, Grand Junction, Colorado; Albright, W.H. [Desert Research Institute, Reno, Nevada; Smith, G.M. [Geo-Smith Engineering, Grand Junction, Colorado; Bush, R.P. [U.S. Department of Energy, Grand Junction, Colorado

    2011-02-27

    The U.S. Department of Energys Office of Legacy Management (LM) initiated a cover assessment project in September 2007 to evaluate an inexpensive approach to enhancing the hydrological performance of final covers for disposal cells. The objective is to accelerate and enhance natural processes that are transforming existing conventional covers, which rely on low-conductivity earthen barriers, into water balance covers, that store water in soil and release it as soil evaporation and plant transpiration. A low conductivity cover could be modified by deliberately blending the upper layers of the cover profile and planting native shrubs. A test facility was constructed at the Grand Junction, Colorado, Disposal Site to evaluate the proposed methodology. The test cover was constructed in two identical sections, each including a large drainage lysimeter. The test cover was constructed with the same design and using the same materials as the existing disposal cell in order to allow for a direct comparison of performance. One test section will be renovated using the proposed method; the other is a control. LM is using the lysimeters to evaluate the effectiveness of the renovation treatment by monitoring hydrologic conditions within the cover profile as well as all water entering and leaving the system. This paper describes the historical experience of final covers employing earthen barrier layers, the design and operation of the lysimeter test facility, testing conducted to characterize the as-built engineering and edaphic properties of the lysimeter soils, the calibration of instruments installed at the test facility, and monitoring data collected since the lysimeters were constructed.

  16. Applied Materials | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Applied Materials Argonne's nanocomposite charge drain coatings represent a significant breakthrough in the effort to develop microelectromechanical systems, or MEMS. Argonne's nanocomposite charge drain coatings represent a significant breakthrough in the effort to develop microelectromechanical systems, or MEMS. Argonne is a leading technology developer with the advanced manufacturing industry and government sponsors and clients. The emphasis is on applied technology demonstration that often

  17. CX-012074: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Canyon City West-Midway 230-Kilovolt Transmission Line Safety Marker Ball Installation CX(s) Applied: B.13 Date: 04/07/2014 Location(s): Colorado, Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  18. CX-100620 Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Unobtrusive Multi-static Serial LiDAR Imager (UMSLI) for Wide-area Surveillance and Identification of Marine Life at MHK Installations Award Number: DE-EE0006787 CX(s) Applied: A9, B3.3, B3.16 Water Power Program Date: 05/19/2016 Location(s): FL Office(s): Golden Field Office

  19. CX-007659: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of a Two 3-megavolt Ampere Reactive Capacitor Banks on a New Concrete Pad in A-Area CX(s) Applied: B1.7 Date: 11/30/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office

  20. CX-100577 Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Reduction of System Cost Characteristics Through Innovative Solutions to Installation, Operations, and Maintenance Award Number: DE-EE0007347 CX(s) Applied: A9 Water Power Program br> Date: 03/18/2016 Location(s): WA Office(s): Golden Field Office

  1. CX-009803: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Western's Power Marketing Operations Center New Fiber Optic Cable Installation CX(s) Applied: B1.31, B2.2, B4.7 Date: 01/16/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  2. CX-008783: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Fiber Optic Installation at the Stegall 230 Kilovolt Substation Scotts Bluff County, Nebraska CX(s) Applied: B4.7 Date: 06/20/2012 Location(s): Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region

  3. CX-009102: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install a 40 Foot X 40 Foot Butler-type Building and Ten Portable Craft Crew Shacks CX(s) Applied: B1.15 Date: 08/30/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

  4. CX-010846: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install Stud, Shims, and Nut in the L-Basin 70-Ton Cask Lid Support Structure CX(s) Applied: B2.5 Date: 07/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

  5. CX-010850: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install Well Pump into the F-Tank Farm Catch Tank FL-241901-WTS-TK-1 CX(s) Applied: B1.3 Date: 07/23/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

  6. CX-100541 Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of Solar Panels at Municipal Owned Facilities Award Number: DE-EE0003195 CX(s) Applied: B5.16 Solar Energy Technology Office Date: 07/30/2014 Location(s): NJ Office(s): Golden Field Office

  7. CX-010845: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Temporary Modification (ETP-TMC-13-01) to Install an Ultrasonic Sound Emitting Device to Control Algae in the H-Retention Basin CX(s) Applied: B3.6 Date: 07/31/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

  8. CX-011159: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Temporary Modification (ETP-TMC-13-01) to Install an Ultrasonic Sound-Emitting Device to Control Algae in the H-Retention Basin CX(s) Applied: B3.6 Date: 08/13/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

  9. CX-010884: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    North Gunnison-Salida 115-Kilovolt Pole Installation and Site Road Maintenance, Saquache County, Colorado CX(s) Applied: B1.3 Date: 07/31/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  10. CX-100618 Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Community-scale PV System Installation Award Number: DE-EE0006952 CX(s) Applied: A9, B5.16 Office of Indian Energy Date: 05/26/2016 Location(s): ND Office(s): Golden Field Office

  11. CX-100225 Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Heritage Plaza Parking Lot Improvements Project: Solar PV Carport Installation Award Number: DE-EE0006945 CX(s) Applied: A9, B5.16 Tribal Energy Program Date: 04/20/15 Location(s): CA Office(s): Golden Field Office

  12. CX-012502: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Renovation of 920 Plateau West Parking Lot Drainage System and Wallace Road Curb Installation Project CX(s) Applied: B1.15, B1.33, B2.5Date: 41852 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory

  13. CX-008273: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Install New Parking Lot Area Over Old Concrete Slab by Daycare at Morgantown National Energy Technology Laboratory Site CX(s) Applied: B1.15, B1.24 Date: 05/11/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory

  14. CX-100503 Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Transforming PV installations toward dispatchable, schedulable energy solutions Award Number: DE-EE0005340 CX(s) Applied: A9, B3.6 Solar Energy Technologies Office Date: 03/26/2014 Location(s): Mult Office(s): Golden Field Office

  15. CX-011678: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Fabricate/Install Tank 42 Temporary Purge Ventilation Stack HEPA Filter HTF-TMC-13-033 CX(s) Applied: B2.5 Date: 12/09/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

  16. CX-013671: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Removal of Out of Service Equipment and Installation of high-efficiency particulate air Filter in Test Reactor Area 670 Pump Test Room CX(s) Applied: B2.5Date: 05/19/2015 Location(s): IdahoOffices(s): Idaho Operations Office

  17. CX-013306: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Approval of Land Use Review Request for Sewer Installation and Park Construction in a BPA Right-of-Way in Clark County CX(s) Applied: B4.9Date: 01/26/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration

  18. CX-011394: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Measuring Changes in Ambient Noise Levels from the Installation and Operation of a Wave Energy Converter in the Coastal Ocean CX(s) Applied: B3.3 Date: 12/17/2013 Location(s): Oregon Offices(s): Golden Field Office

  19. CX-010406: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Davis Dam to Kingman Tap 69 Kilovolt Transmission Line, Overhead Optical Power Ground Wire Installation CX(s) Applied: B4.7 Date: 05/16/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  20. CX-012334: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install Single Split System Air Conditioning Unit in Bryan Mound Building No. 281 (BM-OM-1229) CX(s) Applied: B1.4 Date: 06/30/2014 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office

  1. CX-007909: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Ambler Boiler House Geothermal Wells, Cool Roof and Photovoltaic installation CX(s) Applied: B5.1, B5.16, B5.19 Date: 02/08/2012 Location(s): Pennsylvania Offices(s): Golden Field Office

  2. CX-010676: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Pinnacle Peak- Rogers 230-kilovolt Double Inset Structure Number 5/1 a installation CX(s) Applied: B4.12 Date: 06/28/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  3. CX-010159: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install Rip Rap Along Stream Bank at Two Wood Pole Structures Located Along the Bell-Boundary No. 3 Transmission Line CX(s) Applied: B1.3 Date: 03/25/2013 Location(s): Washington Offices(s): Bonneville Power Administration

  4. CX-100075: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Unobtrusive Multi-static Serial LiDAR Imager (UMSLI) for Wide-area Surveillance and Identificaiton of Marine Life at MHK Installations Award: DE-EE0006787 CX(s) Applied: A9, B3.6 Water Power Program Date: 09/23/2014 Location(s): Florida Office(s): Golden Field Office

  5. CX-008765: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install Six Groundwater Monitoring Wells and Perform General Site Actions at the Bluewater Uranium Mill Tailings Radiation Control Act Site Near Grants, New Mexico CX(s) Applied: B1.3, B3.1 Date: 05/16/2012 Location(s): New Mexico Offices(s): Legacy Management

  6. CX-100211 Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Reducing BOS costs, improving reliability, and enabling safety shutdown of solar installations through module-integrated electronics Award Number: DE-EE0006682 CX(s) Applied: A9, B3.6, B5.16 Solar Energy Technologies Office Date: 04/02/2015 Location(s): CA Office(s): Golden Field Office

  7. CX-006156: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Utility Metering Installation: B3, B14, B36CX(s) Applied: B1.15, B2.2Date: 07/13/2011Location(s): Morgantown, West VirginiaOffice(s): Fossil Energy, National Energy Technology Laboratory

  8. CX-009161: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Energy Audit; Efficiency Improvements; and Renewable Energy Installations; Township of Branchburg, NJ CX(s) Applied: B5.1, B5.16, B5.23 Date: 09/14/2012 Location(s): New Jersey Offices(s): Golden Field Office

  9. CX-011601: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Mission Support Alliance Annual Categorical Exclusion for Installation or Relocation of Machinery and Equipment under 10 CFR 1021, Subpart D, Appendix B, B1.31 for Calendar Year 2014 CX(s) Applied: B1.31 Date: 12/02/2013 Location(s): Washington Offices(s): River Protection-Richland Operations Office

  10. CX-012088: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Emergency Installation of Concrete Pad for Western's Communication Tower at Valley Farms Substation CX(s) Applied: B4.6 Date: 04/01/2014 Location(s): Arizona, Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  11. CX-100271 Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Measuring changes in ambient noise levels from the installation and operation of a wave energy converter in the coastal ocean Award Number: DE-EE0006387 CX(s) Applied: B3.3 Water Power Program Date: 06/04/2015 Location(s): OR Office(s): Golden Field Office

  12. CX-100492 Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    STM TTF Cargo Container Pad Installation; NREL 14-004 Award Number: DE-AC36-08GO28308 CX(s) Applied: DOE/EA-1440 National Renewable Energy Laboratory (NREL) Date: 02/21/14 Location(s): CO Office(s): Golden Field Office

  13. CX-007653: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install Purge Water Management Unit(s) at Chemicals, Metals, and Pesticides Pits Monitoring Well(s) CX(s) Applied: B6.9 Date: 12/13/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office

  14. CX-009661: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Mission Support Alliance Annual Categorical Exclusion for Installation or Relocation of Machinery and Equipment under 10 CFR 1021, Subpart D, Appendix B CX(s) Applied: B1.31 Date: 12/05/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office

  15. CX-011718: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Electrical District 2 to Saguaro #2 115 Kilovolt Transmission Line, Marker Ball Installation at Structure 26-10. CX(s) Applied: B1.3 Date: 01/09/2014 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  16. CX-002226: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Town of Cary's Listing of Positions and Installations CX(s) Applied: A1, A9, A11, B2.5, B5.1Date: 05/06/2010Location(s): Cary, North CarolinaOffice(s): Energy Efficiency and Renewable Energy

  17. CX-013373: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of Sentinel Wells MSB-113-A, -B, and -C for the A-2 Air Stripper System CX(s) Applied: B3.1Date: 01/20/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  18. CX-010773: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install Air Conditioning in the Fuel Manufacturing Facility (FMF) (Materials and Fuel Complex [MFC]-704) Security Police Officer (SPO) Office CX(s) Applied: B2.1 Date: 07/17/2013 Location(s): Idaho Offices(s): Nuclear Energy

  19. CX-008791: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Western Area Power Administration and Tri-State Generation and Transmission Association, Inc. Fiber Optic Installation Project From Beaver Creek to Big Sandy Substations Morgan, Washington, and Lincoln Counties, Colorado CX(s) Applied: B1.3 Date: 05/09/2012 Location(s): Washington, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  20. CX-100489 Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    NWTC Installation of UGE Visionair Turbine; NREL Tracking No. 14-007 Award Number: DE-AC36-08GO28308 CX(s) Applied: DOE/EA-1378 National Renewable Energy Laboratory (NREL) Date: 02/21/14 Location(s): CO Office(s): Golden Field Office

  1. CX-100544 Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Aberdeen Proving Ground 8 MW Combined Heat and Power Installation Award Number: DE-EE0006617 CX(s) Applied: A9 Federal Emergency Management Program Date: 07/31/2014 Location(s): MD Office(s): Golden Field Office

  2. CX-010104: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Broken Link: Table Mountain Rancheria of California Tribe Proposes Energy Use Study As Well As Heating and Cooling Install/Replace CX(s) Applied: CX: none Date: CX: none Location(s): California Offices(s): Energy Efficiency and Renewable Energy

  3. CX-004502: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Energy Efficiency and Conservation Block Grant: Installation of Photovoltaic System to Serve County of Monterey Laurel Yard Facilities (Activity 1)CX(s) Applied: B5.1Date: 11/19/2010Location(s): County of Monterey, CaliforniaOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office

  4. Savings Project: Install Exterior Storm Windows With Low-E Coating...

    Office of Environmental Management (EM)

    while keeping your home warm in the winter and cool in the summer. | Photo courtesy of Larson Manufacturing Company. Installing storm windows will lower your energy bill while...

  5. Consider Installing Turbulators on Two- and Three-Pass Firetube Boilers

    SciTech Connect (OSTI)

    Not Available

    2006-01-01

    This revised ITP tip sheet on installing turbulators on firetube boilers provides how-to advice for improving the system using low-cost, proven practices and technologies.

  6. Consider Installing Turbulators on Two- and Three-Pass Firetube Boilers - Steam Tip Sheet #25

    SciTech Connect (OSTI)

    None

    2006-01-01

    This revised AMO tip sheet on installing turbulators on firetube boilers provides how-to advice for improving the system using low-cost, proven practices and technologies.

  7. Consider Installing Turbulators on Two- and Three-Pass Firetube Boilers - Steam Tip Sheet #25

    SciTech Connect (OSTI)

    2012-01-01

    This revised AMO tip sheet on installing turbulators on firetube boilers provides how-to advice for improving the system using low-cost, proven practices and technologies.

  8. Fuel Cell Installation Improves Reliability and Saves Energy at a Corporate Data Center

    SciTech Connect (OSTI)

    2002-05-01

    In 2002, Chevron Energy Solutions implemented a fuel cell installation project at the corporate data center of Chevron Texaco's corporate headquarters in San Ramon, California.

  9. EERE Success Story-Helping Ensure High-Quality Installation of...

    Broader source: Energy.gov (indexed) [DOE]

    the trainers" in high quality solar installation instruction throughout the Midwest. ... addressing a critical need for high-quality, local, and accessible training in solar ...

  10. Savings Project: Install Exterior Storm Windows With Low-E Coating...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Larson Manufacturing Company. Installing storm windows will lower your energy bill while keeping your home warm in the winter and cool in the summer. | Photo courtesy of Larson ...

  11. Characterization of the Installed Costs of Prime Movers Using Gaseous Opportunity Fuels, September 2007

    Broader source: Energy.gov [DOE]

    A report addendum and final white paper for the Characterization of the Installed Costs of Prime Movers Using Gaseous Opportunity Fuels

  12. A Homeowners Guide to Window Air Conditioner Installation for...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Window air conditioners (ACs) are an inexpensive alternative to central systems, and are ... The study showed that window AC installation resulted in signifcant air ...

  13. Sundance, Skiing and Solar: Park City to Install New PV System | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Sundance, Skiing and Solar: Park City to Install New PV System Sundance, Skiing and Solar: Park City to Install New PV System October 25, 2010 - 10:49am Addthis Park City, UT has completed several green projects recently. The town is installing a solar energy system on top of the Marsac Building at the end of the month. | Photo courtesy of Park City | Park City, UT has completed several green projects recently. The town is installing a solar energy system on top of the Marsac

  14. Million Solar Strong: U.S. Hits Millionth Solar Energy Installation |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Million Solar Strong: U.S. Hits Millionth Solar Energy Installation Million Solar Strong: U.S. Hits Millionth Solar Energy Installation April 21, 2016 - 1:14pm Addthis Million Solar Strong: U.S. Hits Millionth Solar Energy Installation Today GreenTech Media announced that the U.S. solar energy industry passed 1 million installations sometime around the end of February. This news comes as solar continues to represent a major and growing share of the new generation that

  15. Federal Grant Fully Funds Small Turbine Installation at Maine Senior Housing Complex

    SciTech Connect (OSTI)

    2009-02-26

    Article on a federal Residential Energy Assistance Challenge grant that funded the installation of a small wind turbine at a retirement center.

  16. Obama Administration Announces Plans to Install New Solar Panels on the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    White House Residence | Department of Energy Plans to Install New Solar Panels on the White House Residence Obama Administration Announces Plans to Install New Solar Panels on the White House Residence October 5, 2010 - 12:00am Addthis WASHINGTON - U.S. Energy Secretary Steven Chu and Council of Environmental Quality (CEQ) Chair Nancy Sutley today announced plans to install solar panels and a solar hot water heater on the roof of the White House Residence. These two solar installations will

  17. DOE 1.5 Installation Time Lapse Video (Text Version) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE 1.5 Installation Time Lapse Video (Text Version) DOE 1.5 Installation Time Lapse Video (Text Version) Below is the text version for the DOE 1.5 Installation Time Lapse Video. The National Renewable Energy Laboratory installs a 1.5-MW wind turbine for the U.S. Department of Energy at its National Wind Technology Center located just south of Boulder, Colorado. The construction site is a grassy field that overlooks the eastern plains of Colorado. Two blue construction cranes work together to

  18. Savannah River Site Liquid-Waste Contractor Installs New Cost-Saving Pump

    Office of Environmental Management (EM)

    Design | Department of Energy Liquid-Waste Contractor Installs New Cost-Saving Pump Design Savannah River Site Liquid-Waste Contractor Installs New Cost-Saving Pump Design October 29, 2015 - 12:05pm Addthis New submersible mixing pumps have been installed in radioactive waste tanks at the Savannah River Site, fulfilling a cost-saving initiative for Savannah River Remediation, EM’s liquid-waste contractor at SRS. New submersible mixing pumps have been installed in radioactive waste tanks

  19. Effects of installing economizers in boilers used in space heating applications

    SciTech Connect (OSTI)

    Gonzalez, M.A.; Medina, M.A.; Schruben, D.L.

    1999-07-01

    This paper discusses how the performance of a boiler can be improved by adding an economizer to preheat the boiler's feedwater. An energy analysis was applied to a boiler and then to both a boiler and an economizer (water pre-heater) to evaluate the benefits of heat recovery. Exergy rates calculated for both the boiler and the economizer determined that the temperature of the stack gases had primary effects on the performance of a boiler. The results from this study showed that 57% of the heat rejected at the boiler's stack could be recovered by installing an economizer to preheat the feedwater. As a result, the average cost savings that would be realized for a 36,400 kg/h (80,000 lbm/h) boiler averages US$8 per hour. The cost savings to steam production averaged US$0.20 per 455 kg (1,000 lbm) of steam and the ration between the cost savings to stack temperature averaged $0.02 per C (1.8 F). For this case, the fuel and the cost savings realized from using an economizer were averaged at 3.8% and 3.7%, respectively. These results translated to total cost savings, for an eight-day period considered, of US$940.

  20. Applied Sedimentology | Open Energy Information

    Open Energy Info (EERE)

    Sedimentology Jump to: navigation, search OpenEI Reference LibraryAdd to library Book: Applied Sedimentology Author R.C. Salley Published Academic Press, 2000 DOI Not Provided...