Powered by Deep Web Technologies
Note: This page contains sample records for the topic "inspection maintenance repairs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Inspect and Repair Steam Traps  

Broader source: Energy.gov [DOE]

This tip sheet on inspecting and repairing steam traps provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

2

Solar Water Heating System Maintenance and Repair | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Water Heating System Maintenance and Repair Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair May 30, 2012 - 2:35pm Addthis Rooftop solar water heaters need regular maintenance to operate at peak efficiency. | Photo from iStockphoto.com Rooftop solar water heaters need regular maintenance to operate at peak efficiency. | Photo from iStockphoto.com Solar energy systems require periodic inspections and routine maintenance to keep them operating efficiently. Also, from time to time, components may need repair or replacement. You should also take steps to prevent scaling, corrosion, and freezing. You might be able to handle some of the inspections and maintenance tasks on your own, but others may require a qualified technician. Ask for a cost estimate in writing before having any work done. For some systems, it may

3

Chapter 4 - Pipeline Inspection and Subsea Repair  

Science Journals Connector (OSTI)

Abstract Pipeline inspection is a part of the pipeline integrity management for keeping the pipeline in good condition. The rules governing inspection are the pipeline safety regulations. In most cases the pipeline is inspected regularly. The pipeline safety regulations require that the operator shall insure that a pipeline is maintained in an efficient state, in efficient working order and in good repair. The pipeline inspection includes external inspection and internal inspection. In this chapter, the metal loss inspection techniques are discussed. The subsea pipeline internal inspection is normally carried out through non-destructive testing techniques and technologies by intelligent pigs, such as magnetic-flux leakage technology inn axial and circumferential, ultrasound technologies, eddy-current technologies and other technologies. The repair methods are different for shallow and deep water subsea pipelines. The conventional repair methods are used for shallow water pipeline, but diverless repair and intelligent plus are good for deepwater pipeline repair.

Yong Bai; Qiang Bai

2014-01-01T23:59:59.000Z

4

Developments advance subsea pipelaying, inspection, repair  

SciTech Connect (OSTI)

Recent advances in laying, inspecting, and repairing pipelines are helping to cut both costs and time. A new dredging system that employs jets to clear a subsea trench for pipelay received trials off Belgium last spring. Also, within the last year, projects in the Middle East and North Sea employed technologies that promise to make inspecting the surface of a subsea pipeline in difficult terrain easier, less time consuming, and therefore less costly. Plus, subsea repair of damaged pipelines may take less time with a new ``stabbable`` pipe connector. The paper describes jet dredging, inspection advance, support software, the North Sea site, and pipeline repair.

NONE

1997-09-15T23:59:59.000Z

5

Assessment of Bridge Inspection and Maintenance in the United States  

E-Print Network [OSTI]

Bridge inspection and maintenance is extremely important to the country since it is the economic lifeblood of the United States business and people relying upon them to do business and get to work. Although bridge disasters are relatively rare...

Kwok, Kin Yip George

2009-01-01T23:59:59.000Z

6

Simple Maintenance Saves Costly Furnace Repair/Replacement | Department of  

Broader source: Energy.gov (indexed) [DOE]

Simple Maintenance Saves Costly Furnace Repair/Replacement Simple Maintenance Saves Costly Furnace Repair/Replacement Simple Maintenance Saves Costly Furnace Repair/Replacement January 6, 2010 - 8:26am Addthis Chris Stewart Senior Communicator at DOE's National Renewable Energy Laboratory For the past few weeks, my forced-air gas furnace has been on the fritz. I blame this on the fact that I haven't been as diligent as I should have been with regular furnace maintenance, which includes: Checking the condition of the vent connection pipe and chimney Checking the physical integrity of the heat exchanger Adjusting the controls to provide optimum water and air temperature settings for both efficiency and comfort Having a technician perform a combustion-efficiency test Checking the combustion chamber for cracks. Testing for carbon monoxide

7

13 - Maintenance and repair of gas turbine components  

Science Journals Connector (OSTI)

Abstract: Material selection is a key factor in gas turbine performance and lifecycle cost because it has a central influence in the maintenance of the gas turbine.1 Further, the operation of a gas turbine does result in gas path degradation2 that impacts lifecycle costs and eventually design, manufacture, material choice and maintenance.3 A component repair programme that minimizes maintenance costs and maximizes equipment availability can be instituted to meet or improve lifecycle cost. This chapter presents the key factors influencing the need for maintenance and the choices available.

T. Álvarez Tejedor; R. Singh; P. Pilidis

2013-01-01T23:59:59.000Z

8

Spatial variability-based corrosion risk assessment and strategy of repair and maintenance for RC structures  

Science Journals Connector (OSTI)

A corrosion risk assessment model (CRAM) of reinforced concrete structures subjected to marine environment is presented. The spatial variability of parameters, which are decisive for the durability performance, is modelled probabilistically in terms of sample statistics, which may be assessed by testing of existing structures. The result of the chloride profile test is suggested to update the input model parameters for future structural condition prediction. The requirements to the service life performance are formulated in terms of the probability that the structure will be in a certain condition class after a given service time. Further, it is demonstrated how optimal strategies for repair and maintenance of concrete structure subject to chloride ingress can be determined on the basis of corrosion risk classes. The present method to plan optimal repair strategy is illustrated by an assessment case. For structures with large concrete surface exposed to chloride-laden environment, both spatial and temporal characteristics of deterioration are suggested to consider in condition assessment based on field inspection.

Xiao-Zhou Wang; Wei-Liang Jin

2009-01-01T23:59:59.000Z

9

Maintenance and repair expenditures: determinants and tradeoffs with new capital goods  

Science Journals Connector (OSTI)

Traditionally economic analysis has focused on new capital investment, while ignoring expenditures to maintain or repair existing stock. Recent, broader theories of replacement have emphasized the important role played by both maintenance and utilization rates. However, the decision to extend the service life of capital has been given scant empirical attention, owing partly to a lack of appropriate data. This study exploits survey data that report annual maintenance/repair expenditures for Canadian manufacturing industries. A standard production framework, modified to incorporate endogenous depreciation, guides the econometric analysis. The empirical results indicate that the cost of capital, among other variables, has a statistically significant effect on maintenance/repair decisions.

J.K. Mullen; Martin Williams

2004-01-01T23:59:59.000Z

10

Home Maintenance Manual.  

E-Print Network [OSTI]

. College Station , Texas l Introduction A regular program of maintenance inspections can help homeowners identify and correct problems before they become serious. Unfortunately, a maintenance problem ignored becomes a major repair. Preventive... maintenance can extend the life of materials and equipment and will be less expensive in the long run than replacement. Maintaining a home need not be difficult, but it requires a regular program of inspection to identify and correct problems before...

Anonymous,

1985-01-01T23:59:59.000Z

11

Home Maintenance and Repair Owning a home is a major responsibility.  

E-Print Network [OSTI]

Home Maintenance and Repair Owning a home is a major responsibility. Not only do you have the obligation of paying the mortgage each month, but you also have to maintain your home so that it remains a good investment. When talking about taking care of your home, most folks lump home maintenance

12

COOPERATIVE AND NON-COOPERATIVE DECISION BEHAVIORS IN RESPONSE TO THE INSPECTION AND MAINTENANCE PROGRAM IN THE ATLANTA  

E-Print Network [OSTI]

COOPERATIVE AND NON-COOPERATIVE DECISION BEHAVIORS IN RESPONSE TO THE INSPECTION AND MAINTENANCE BEHAVIORS IN RESPONSE TO THE INSPECTION AND MAINTENANCE PROGRAM IN THE ATLANTA AIRSHED, 1997-2001 Bryan G not have been able to cover the immense research landscape that is presented in this dissertation. Bryan

Vermont, University of

13

Fatigue Reliability-based Inspection and Maintenance Planning of Gearbox Components in Wind Turbine Drivetrains  

Science Journals Connector (OSTI)

Abstract This paper introduces a reliability-based maintenance plan for wind turbine gearbox components. The gears and bearings are graded based on their fatigue damage and a maintenance map is developed to focus on those components with higher probability of fatigue failure and lower level of reliability. The main aim of this paper is to propose a method for developing the “vulnerability map” which can be used by maintenance teams to identify the components with lower reliabilities. The fatigue damage for gears and bearings are calculated at rated wind speed by the SN curve approach. The load duration distribution (LDD) method is used to obtain the stress range cycles for gears and load range cycles for bearings from the load and load effect time series obtained from a global response analysis. During routine inspection and maintenance, the vulnerability map can be used to find the faulty component by inspecting those with highest probability of failure rather than examining all gears and bearings. Such maps can be used for fault detection during routine maintenance and can reduce the down time and efforts of maintenance team to identify the source of problem. The proposed procedure is exemplified by a 750 kW gearbox and a vulnerability map is developed for this case study gearbox.

Amir Rasekhi Nejad; Zhen Gao; Torgeir Moan

2014-01-01T23:59:59.000Z

14

Steam turbine maintenance and repair technology: Reducing planned-outage costs  

SciTech Connect (OSTI)

The North American Electric Reliability Council (NAERC) reported that the average loss of equivalent availability per outage for a major fossil turbine overhaul is 323,000 MW-HR. The Electric Power Research Institute (EPRI) Generation and Storage Division, is in the first phase of a major research project to reduce the duration and/or frequency of steam turbine maintenance outages. This project consists of an assessment of the current state-of-the-art turbine maintenance and repair techniques and technologies. It is based on a review of current turbine maintenance practices of the US, European, Japanese, and Australian utility industries. Emphasized are maintenance and repair activities that have the most significant impact on outage duration or frequency. Twenty-six key turbine maintenance activities and the current best techniques were identified for use by utility maintenance personnel. Overall outage durations could be reduced if the duration of these activities were shortened or if they were performed more effectively. Recommended projects for development of advanced steam turbine maintenance technology were identified. 29 refs., 46 figs., 9 tabs.

Grace, H.P.; McClintock, M. (General Physics Corp., Columbia, MD (USA)); Lamping, G. (Southwest Research Inst., San Antonio, TX (USA))

1990-04-01T23:59:59.000Z

15

Y-12 Groundwater Protection Program Monitoring Well Inspection and Maintenance Plan  

SciTech Connect (OSTI)

This document is the third revision of the 'Monitoring Well Inspection and Maintenance Plan' for groundwater wells associated with the US Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. This plan describes the systematic approach for: (1) inspecting the physical condition of monitoring wells at Y-12; (2) identifying maintenance needs that extend the life of the well and assure well-head protection is in place, and (3) identifying wells that no longer meet acceptable monitoring-well design or well construction standards and require plugging and abandonment. The inspection and maintenance of groundwater monitoring wells is one of the primary management strategies of the Y-12 Groundwater Protection Program (GWPP) Management Plan, 'proactive stewardship of the extensive monitoring well network at Y-12' (BWXT 2004a). Effective stewardship, and a program of routine inspections of the physical condition of each monitoring well, ensures that representative water-quality monitoring and hydrologic data are able to be obtained from the well network. In accordance with the Y-12 GWPP Monitoring Optimization Plan (MOP) for Groundwater Monitoring Wells at the Y-12 National Security Complex, Oak Ridge, Tennessee (BWXT 2006b), the status designation (active or inactive) for each well determines the scope and extent of well inspections and maintenance activities. This plan, in conjunction with the above document, formalizes the GWPP approach to focus available resources on monitoring wells which provide the most useful data. This plan applies to groundwater monitoring wells associated with Y-12 and related waste management facilities located within the three hydrogeologic regimes: (1) the Bear Creek Hydrogeologic Regime (Bear Creek Regime); (2) the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime); and (3) the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek Regime encompasses a section of the Bear Creek Valley (BCV) immediately west of Y-12. The East Fork Regime encompasses most of the Y-12 process, operations, and support facilities in BCV east of scarboro Road. The Chestnut Ridge Regime is directly south of Y-12 and encompasses a section of Chestnut Ridge that is bound to the west by a surface drainage feature (Dunaway Branch) and by Scarboro Road to the east. The GWPP maintains an extensive database of construction details and related information for the monitoring wells in each hydrogeologic regime in the 'Updated Subsurface Database for Bear Creek Valley, Chestnut Ridge, and parts of Bethel Valley on the US DOE Oak Ridge Reservation (BWXT 2003a). A detailed description of the hydrogeologic framework at Y-12 can be found in the GWPP Management Plan (BWXT 2004a).

None

2006-12-01T23:59:59.000Z

16

Modelling repairable system reliability with explanatory variables and repair and maintenance actions  

Science Journals Connector (OSTI)

......However, in general, in RMs...overhaul of an engine (a midlife...used with diesel engines...g. from diesel engines, such as...is a quite general model, and...analysis of diesel engine failure data...systems with general repair......

Diederik Lugtigheid; agan Banjevic; Andrew K. S. Jardine

2004-04-01T23:59:59.000Z

17

Development and validation of nondestructive inspection techniques for composite doubler repairs on commercial aircraft  

SciTech Connect (OSTI)

Composite doublers, or repair patches, provide an innovative repair technique which can enhance the way aircraft are maintained. Instead of riveting multiple steel or aluminum plates to facilitate an aircraft repair, it is possible to bond a single boron-epoxy composite doubler to the damaged structure. In order for the use of composite doublers to achieve widespread use in the civil aviation industry, it is imperative that methods be developed which can quickly and reliably assess the integrity of the doubler. In this study, a specific composite application was chosen on an L-1011 aircraft in order to focus the tasks on application and operation issues. Primary among inspection requirements for these doublers is the identification of disbonds, between the composite laminate and aluminum parent material, and delaminations in the composite laminate. Surveillance of cracks or corrosion in the parent aluminum material beneath the doubler is also a concern. No single nondestructive inspection (NDI) method can inspect for every flaw type, therefore it is important to be aware of available NDI techniques and to properly address their capabilities and limitations. A series of NDI tests were conducted on laboratory test structures and on full-scale aircraft fuselage sections. Specific challenges, unique to bonded composite doubler applications, were highlighted. An array of conventional and advanced NDI techniques were evaluated. Flaw detection sensitivity studies were conducted on applicable eddy current, ultrasonic, X-ray and thermography based devices. The application of these NDI techniques to composite doublers and the results from test specimens, which were loaded to provide a changing flaw profile, are presented in this report. It was found that a team of these techniques can identify flaws in composite doubler installations well before they reach critical size.

Roach, D.; Walkington, P.

1998-05-01T23:59:59.000Z

18

Review of In-Service Inspection and Repair Technique Developments for French Liquid Metal Fast Reactors  

SciTech Connect (OSTI)

In-service monitoring of nuclear plants is indispensable for both the Operator and the Regulator. The notion of in-service monitoring ranges from the continuous monitoring of the reactor in operation to the thorough in-service reactor inspection during programmed shutdowns. However, the highly specific environment found in French liquid metal fast reactor plants - Phenix and Superphenix - makes monitoring and inspection complicated because of the use of a sodium coolant that is hot, opaque, and difficult to drain.The Commissariat a l'Energie Atomique, in collaboration with its traditional French partners, Electricite de France utilities and FRAMATOME/Novatome Engineering, decided to conduct a 6-yr research and development program (1994-2000) to explore this problem vis-a-vis Superphenix, as well as the possibilities of intervening within the reactor block or on components in a sodium environment. Furthermore, the safety reevaluation of Phenix, conducted between 1994 and 2003, represented an excellent 'test bench' during which the limits of inspection processes - applied to an integrated reactor concept - were surpassed using techniques such as fuel subassembly head scanning, ultrasonic examination of the core support, and visual inspection of the cover-gas plenum following a partial sodium draining. Repair techniques were investigated for cleaning of sodium wet structure surfaces, cutting of damaged parts, and welding in sodium aerosol atmosphere. Both conventional and laser processes were tested.

Baque, F. [Commissariat a l'Energie Atomique Cadarache (France)

2005-04-15T23:59:59.000Z

19

Subterranean barriers, methods, and apparatuses for forming, inspecting, selectively heating, and repairing same  

DOE Patents [OSTI]

A subterranean barrier and method for forming same are disclosed, the barrier including a plurality of casing strings wherein at least one casing string of the plurality of casing strings may be affixed to at least another adjacent casing string of the plurality of casing strings through at least one weld, at least one adhesive joint, or both. A method and system for nondestructively inspecting a subterranean barrier is disclosed. For instance, a radiographic signal may be emitted from within a casing string toward an adjacent casing string and the radiographic signal may be detected from within the adjacent casing string. A method of repairing a barrier including removing at least a portion of a casing string and welding a repair element within the casing string is disclosed. A method of selectively heating at least one casing string forming at least a portion of a subterranean barrier is disclosed.

Nickelson, Reva A. (Shelley, ID); Sloan, Paul A. (Rigby, ID); Richardson, John G. (Idaho Falls, ID); Walsh, Stephanie (Idaho Falls, ID); Kostelnik, Kevin M. (Idaho, ID)

2009-04-07T23:59:59.000Z

20

Y-12 Groundwater Protection Program CY 2009 Triennial Report Of The Monitoring Well Inspection And Maintenance Program, Y-12 National Security Complex, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This document is the triennial report for the Well Inspection and Maintenance Program of the Y- 12 Groundwater Protection Program (GWPP), at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12). This report formally documents well inspection events conducted on active and inactive wells at Y-12 during calendar years (CY) 2007 through 2009; it documents well maintenance and plugging and abandonment activities completed since the last triennial inspection event (CY 2006); and provides summary tables of well inspection events, well maintenance events, and well plugging and abandonment events during the reference time period.

none,

2013-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "inspection maintenance repairs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Maintenance Types  

Broader source: Energy.gov [DOE]

Proper operations and maintenance (O&M) goes beyond repairing equipment after it breaks. Several maintenance strategies exist to prevent systems disrepair and degradation. A combination of the...

22

Inspection, Assessment, and Repair of Grouted Ducts in Post-tensioned Bridge  

E-Print Network [OSTI]

corrosion. The corrosion of strands may lead to the failure of tendons. As such, an effective inspection process for identifying these voids is needed. From a literature review, several non-destructive testing (NDT) methods are compared for applicability...

Im, Seok Been

2011-02-22T23:59:59.000Z

23

Design and Validation of a Mobile Robot for PowerDesign and Validation of a Mobile Robot for PowerDesign and Validation of a Mobile Robot for PowerDesign and Validation of a Mobile Robot for Power Line Inspection and MaintenanceLine Inspection and Mainten  

E-Print Network [OSTI]

of the prototype thorough validation. Working on live lines, up to 735 kV and 1,000 A, means that the technology inspection and maintenance on its transmission lines [9]. From the very beginning, the key objectiveSystem RequirementsSystem RequirementsSystem Requirements A complete review of transmission line components

Paris-Sud XI, Université de

24

Post-Closure Inspection Letter Report for Corrective Action Units on the Nevada National Security Site  

SciTech Connect (OSTI)

This letter serves as the post-closure inspection letter report for Corrective Action Units (CAUs) on the Nevada National Security Site for calendar year 2013. The inspections identified maintenance and repair is required at the following sites: sign and/or fence repair is necessary at CAUs 113, 137, 139, 140, 143, 262, 370, 371, 372, 374, 476, 478, 529, 542, and 560; animal burrows were identified at CAU 547; and erosion was identified at CAUs 366, 367, 383, 551, and 574. In addition, the following use restrictions were removed during 2013 and will no longer be inspected in 2014: 165, 357, and 528.

Boehleke, R. F.

2014-05-06T23:59:59.000Z

25

Draft of new maintenance standards for LWR in Japan  

SciTech Connect (OSTI)

Activities of development of new maintenance standards for operating nuclear power plant in Japan are described. The work of drafting the standards has been done by the Committee of Nuclear Plant Operation and Maintenance Standards (POMS), that was organized in the Japan Power Engineering and Inspection Corporation under the entrustment from the Ministry of International Trade and Industry. The articles of ASME Section XI related to inspection, flaw evaluation and repair have been examined and modified, if necessary, so as to introduce latest Japanese database and technological knowledge. In the area of repairs, many repair techniques verified in recent years in Japan were incorporated i n addition to those specified in ASME Section XI. Finally major differences between ASME Section XI and the draft of the standards are listed.

Iida, Kunihiro [Shibaura Inst. of Tech., Tokyo (Japan). Dept. of Mechanical Engineering

1996-12-01T23:59:59.000Z

26

On risk-based operation and maintenance of offshore wind turbine components  

Science Journals Connector (OSTI)

Operation and maintenance are significant contributors to the cost of energy for offshore wind turbines. Optimal planning could rationally be based on Bayesian pre-posterior decision theory, and all costs through the lifetime of the structures should be included. This paper contains a study of a generic case where the costs are evaluated for a single wind turbine with a single component. Costs due to inspections, repairs, and lost production are included in the model. The costs are compared for two distinct maintenance strategies, namely with and without inclusion of periodic imperfect inspections. Finally the influence of different important parameters, e.g. failure rate, reliability of inspections, inspection interval, and decision rule for repairs, is evaluated.

Jannie Jessen Nielsen; John Dalsgaard Sørensen

2011-01-01T23:59:59.000Z

27

Remote maintenance  

SciTech Connect (OSTI)

A general description is given of the study of maintenance design in reactor designs. The Fusion Experimental Reactor and INTOR-J are discussed in terms of simplicity in remote maintenance design, and a figure shows one of the designs of a torus sector configuration for the Fusion Experimental Reactor. An R-tokamak which is under design is a D-T burning device with a Q less than unity. Technical issues are listed and it is suggested that a long-range plan for fusion remote maintenance should be implemented. A multijoint inspection system and a remote maintenance simulation test model of the divertor module are shown.

Kazawa, Y.; Tachikawa, K.; Tone, T.

1983-12-01T23:59:59.000Z

28

Deepwater pipeline repair technology: A general overview  

SciTech Connect (OSTI)

During the life of oil and gas transportation sea lines, periodic inspection, maintenance and repair in case of major damage are the most important tasks to be considered especially in deepwater installations. In particular the capabilities to perform quick and cost effective repairs have been of strategic importance in the eighties for SNAM during the development of the S.A.S. (Submersible Automatic System) a diverless and guidelineless repair system for the 20 inch Transmediterranean sealines. The trials on this prototype were successfully completed in early summer 1992, simulating a complete repair procedure at 610 in water depth. Based on the technology the authors have acquired during the implementation of the system, an upgrading phase aimed at improving the capability to mate the new 26 inch lines is being developed. Considering that at the moment only a few pipeline transportation systems are laid in deep water, but some new installations are foreseen in the near future, technological developments would be necessary in view of different scenarios other than the Mediterranean area. This paper will be focused on an overview of the existing repair technologies and will discuss the possible future pipelines operating scenarios and the envisaged new developments of repair technology. Possible way of approaching and solving in a cost-effective way the needs of Pipeline Operators to have repair systems available will be discussed for the different pipeline scenarios.

Magnelli, G.; Radicioni, A. [Snamprogetti S.p.A., Fano (Italy). Offshore Division

1994-12-31T23:59:59.000Z

29

Guidance for UMTRA project surveillance and maintenance  

SciTech Connect (OSTI)

The Guidance for UMTRA Project Surveillance and Maintenance describes the procedures that will be used to verify that Uranium Mill Tailings Remedial Action (UMTRA) Project disposal sites continue to function as designed. The approach of this guidance document is to identify surveillance requirements and maintenance procedures that will be used to comply with NRC license requirements. This document addresses five primary activities: Definition and characterization of final site conditions. Site inspections; Ground-water monitoring; Aerial photography; and Custodial maintenance and contingency repair. Final site conditions will be defined and characterized prior to the completion of remedial actions at a site. As-built drawings will be compiled, a final topographic survey will be performed, a vicinity map will be prepared, and ground and aerial photographs will be taken. Survey monuments, site markers, and signs will be established as will a network of monitoring wells.

NONE

1986-01-01T23:59:59.000Z

30

Preventive Maintenance Strategies for Compressed Air Systems  

Broader source: Energy.gov [DOE]

This tip sheet discusses preventive maintenance strategies for compressed air systems to avoid high equipment repair and replacement costs.

31

Life after inspection  

SciTech Connect (OSTI)

To gain a financial benefit, a smart operator views inspection as part of an overall strategy to maintain a safe pipeline. This paper shows how periodic internal inspections, followed by defect assessments using fitness-for-purpose criteria and selective repair, is the most cost beneficial way of maintaining the safety of a pipeline. It is highlighted that it is important to use (i) genuine high resolution pigs for the inspection and (ii) expert fitness-for-purpose assessment. The cost savings on the optimized future safe operating strategies for the pipeline offset the costs of the inspection and expert assessment.

Grimes, K. [BG Inspection Services Inc., Houston, TX (United States); Jones, D.G. [Pipeline Integrity International, Cramlington (United Kingdom)

1996-12-31T23:59:59.000Z

32

Decontamination and decommissioning surveillance and maintenance report for FY 1991  

SciTech Connect (OSTI)

The Decontamination and Decommissioning (D D) Program has three distinct phases: (1) surveillance and maintenance (S M); (2) decontamination and removal of hazardous materials and equipment (which DOE Headquarters in Washington, D.C., calls Phase I of remediation); and (3) decommissioning and ultimate disposal, regulatory compliance monitoring, and property transfer (which DOE Headquarters calls Phase II of remediation). A large part of D D is devoted to S M at each of the sites. Our S M activities, which are performed on facilities awaiting decommissioning, are designed to minimize potential hazards to human health and the environment by: ensuring adequate containment of residual radioactive and hazardous materials; and, providing physical safety and security controls to minimize potential hazards to on-site personnel and the general public. Typically, we classify maintenance activities as either routine or special (major repairs). Routine maintenance includes such activities as painting, cleaning, vegetation control, minor structural repairs, filter changes, and building system(s) checks. Special maintenance includes Occupational Safety and Health Act facility upgrades, roof repairs, and equipment overhaul. Surveillance activities include inspections, radiological measurements, reporting, records maintenance, and security (as required) for controlling and monitoring access to facilities. This report summarizes out FY 1991 S M activities for the Tennessee plant sites, which include the K-25 Site, the Gas Centrifuge facilities, ORNL, and the Y-12 Plant.

Not Available

1991-12-01T23:59:59.000Z

33

Rapid road repair vehicle  

DOE Patents [OSTI]

Disclosed is a rapid road repair vehicle capable of moving over a surface to be repaired at near normal posted traffic speeds to scan for and find at the high rate of speed, imperfections in the pavement surface, prepare the surface imperfection for repair by air pressure and vacuum cleaning, applying a correct amount of the correct patching material to effect the repair, smooth the resulting repaired surface, and catalog the location and quality of the repairs for maintenance records of the road surface. The rapid road repair vehicle can repair surface imperfections at lower cost, improved quality, at a higher rate of speed than was not heretofor possible, with significantly reduced exposure to safety and health hazards associated with this kind of road repair activities in the past. 2 figs.

Mara, L.M.

1998-05-05T23:59:59.000Z

34

Rapid road repair vehicle  

DOE Patents [OSTI]

Disclosed is a rapid road repair vehicle capable of moving over a surface to be repaired at near normal posted traffic speeds to scan for and find an the high rate of speed, imperfections in the pavement surface, prepare the surface imperfection for repair by air pressure and vacuum cleaning, applying a correct amount of the correct patching material to effect the repair, smooth the resulting repaired surface, and catalog the location and quality of the repairs for maintenance records of the road surface. The rapid road repair vehicle can repair surface imperfections at lower cost, improved quality, at a higher rate of speed than was was heretofor possible, with significantly reduced exposure to safety and health hazards associated with this kind of road repair activities in the past.

Mara, Leo M. (Livermore, CA)

1998-01-01T23:59:59.000Z

35

Reliability centered maintenance (RCM) products - future  

SciTech Connect (OSTI)

This paper summarizes products related to RCM of power systems which will soon be available. The titles include: substation RCM handbook and software; substation RCM driven productive maintenance; transmission RCM evaluation; transmission inspection and maintenance workstation; transmission inspection and detection methods; substation RCM implementation and software support; substation maintenance management workstation; transmission RCM handbook and software; transmission inspection and maintenance workstation - TC; distribution RCM handbook and software; transmission RCM implementation and software support; and distribution RCM implementation and software support.

Lyons, P.F.

1996-08-01T23:59:59.000Z

36

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2013  

SciTech Connect (OSTI)

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2013 and includes inspection and repair activities completed at the following CAUs: • CAU 400: Bomblet Pit and Five Points Landfill (TTR) • CAU 407: Roller Coaster RadSafe Area (TTR) • CAU 424: Area 3 Landfill Complexes (TTR) • CAU 453: Area 9 UXO Landfill (TTR) • CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. Photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted on May 14, 2013. Maintenance was performed at CAU 400, CAU 424, and CAU 453. At CAU 400, animal burrows were backfilled. At CAU 424, erosion repairs were completed at Landfill Cell A3-3, subsidence was repaired at Landfill Cell A3-4, and additional lava rock was placed in high-traffic areas to mark the locations of the surface grade monuments at Landfill Cell A3-3 and Landfill Cell A3-8. At CAU 453, two areas of subsidence were repaired and animal burrows were backfilled. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2013. The vegetation monitoring report is included in Appendix F.

Silvas, A. J.

2014-03-03T23:59:59.000Z

37

Post-Closure Inspection Report for the Tonopah Test Range, Nevada  

SciTech Connect (OSTI)

This report provides the results of the semiannual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2006 and includes inspection and repair activities completed at the following nine CAUs: CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 404: Roller Coaster Lagoons and Trench (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 426: Cactus Spring Waste Trenches (TTR); CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR). Post-closure inspections were conducted on May 9, 2006, May 31, 2006, and November 15, 2006. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2006, and the vegetation monitoring report is included in Attachment F. Maintenance and/or repairs were performed at CAU 400, CAU 407, CAU 426, CAU 453, and CAU 487 in 2006. During the May inspection of CAU 400, it was identified that the east and west sections of chickenwire fencing beyond the standard fencing were damaged; they were repaired in June 2006. Also in June 2006, the southeast corner fence post and one warning sign at CAU 407 were reinforced and reattached, the perimeter fencing adjacent to the gate at CAU 426 was tightened, and large animal burrows observed at CAU 453 were backfilled. Cracking observed in three monuments at CAU 487 was repaired using sealant during the May 9, 2006, inspection. At this time, the TTR post-closure site inspections should continue as scheduled. Any potential problem areas previously identified (e.g., areas of erosion, subsidence) should be monitored closely, and periodic vegetation surveys of the vegetated covers should continue.

NSTec Environmental Restoration

2007-06-01T23:59:59.000Z

38

Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Inspection  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Alternative Fuel Alternative Fuel Vehicle (AFV) Inspection and Maintenance Exemption to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Inspection and Maintenance Exemption on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Inspection and Maintenance Exemption on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Inspection and Maintenance Exemption on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Inspection and Maintenance Exemption on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Inspection and Maintenance Exemption on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Inspection and Maintenance Exemption on AddThis.com...

39

Inspection Report: IG-0780 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0 0 Inspection Report: IG-0780 October 25, 2007 Work Order Estimate and Cost Issues for Site Support Services at Los AlamosNational Laboratory The Department of Energy's Los Alamos National Laboratory (LANL) is one of the largest multidisciplinary science institutions in the world. The National Nuclear Security Administration has cognizance over the Laboratory. Site support services at LANL, including maintenance and repairs, are provided by KSL Services Joint Venture (KSL) under a 5-year, almost $800 million, cost-plus-award-fee subcontract arrangement. Ultimately, essentially all KSL charges are reimbursed by the Department through the Laboratory. Under the terms of the subcontract, KSL is to excercise disciplne and rigor to ensure that appropriate levels of project

40

No maintenance -- no energy efficiency  

SciTech Connect (OSTI)

Field investigations illustrate that it is not realistic to expect new high-tech equipment to function for a full life expectancy at high efficiency without significant operations and maintenance (O&M). A simple walk through inspection of most buildings reveals extensive equipment that is being operated on manual override, is incorrectly adjusted and operating inefficiently, or is simply inoperative. This point is illustrated with two examples at Robins Air Force Base, Georgia. The first describes development of a comprehensive, base-wide, steam trap maintenance program. The second describes a measured evaluation from a typical office building. The objective of both examples was to assess the importance of proper O&M. The proposed ``O&M First`` philosophy will result in more efficient building HVAC operation, provide improved services to the building occupants, and reduce energy consumption and unscheduled equipment repair/replacement. Implementation of a comprehensive O&M program will result in a 15--25% energy savings. The O&M foundation that is established will allow other energy conservation activities such is demand side management or energy management and control systems, to achieve and maintain their expected energy savings.

Szydlowski, R.F.; Schliesing, J.S.; Winiarski, D.W.

1994-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "inspection maintenance repairs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Decontamination and decommissioning surveillance and maintenance report for FY 1991. Environmental Restoration Program  

SciTech Connect (OSTI)

The Decontamination and Decommissioning (D&D) Program has three distinct phases: (1) surveillance and maintenance (S&M); (2) decontamination and removal of hazardous materials and equipment (which DOE Headquarters in Washington, D.C., calls Phase I of remediation); and (3) decommissioning and ultimate disposal, regulatory compliance monitoring, and property transfer (which DOE Headquarters calls Phase II of remediation). A large part of D&D is devoted to S&M at each of the sites. Our S&M activities, which are performed on facilities awaiting decommissioning, are designed to minimize potential hazards to human health and the environment by: ensuring adequate containment of residual radioactive and hazardous materials; and, providing physical safety and security controls to minimize potential hazards to on-site personnel and the general public. Typically, we classify maintenance activities as either routine or special (major repairs). Routine maintenance includes such activities as painting, cleaning, vegetation control, minor structural repairs, filter changes, and building system(s) checks. Special maintenance includes Occupational Safety and Health Act facility upgrades, roof repairs, and equipment overhaul. Surveillance activities include inspections, radiological measurements, reporting, records maintenance, and security (as required) for controlling and monitoring access to facilities. This report summarizes out FY 1991 S&M activities for the Tennessee plant sites, which include the K-25 Site, the Gas Centrifuge facilities, ORNL, and the Y-12 Plant.

Not Available

1991-12-01T23:59:59.000Z

42

Risk Based Maintenance Optimization using Probabilistic Maintenance Quantification Models of Circuit Breaker  

E-Print Network [OSTI]

and maintenance techniques of the component. The model is based on the concept of representing the component life time by several deterioration stages. Inspection and maintenance is introduced at each stage and model parameters are defined. A sensitivity analysis...

Natti, Satish

2010-01-14T23:59:59.000Z

43

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2007  

SciTech Connect (OSTI)

This report provides the results of the semiannual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2007 and includes inspection and repair activities completed at the following nine CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 404: Roller Coaster Lagoons and Trench (TTR); (3) CAU 407: Roller Coaster RadSafe Area (TTR); (4) CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR); (5) CAU 424: Area 3 Landfill Complexes (TTR); (6) CAU 426: Cactus Spring Waste Trenches (TTR); (7) CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR); (8) CAU 453: Area 9 UXO Landfill (TTR); and (9) CAU 487: Thunderwell Site (TTR). In a letter from the Nevada Division of Environmental Protection (NDEP) dated December 5, 2006, NDEP concurred with the request to reduce the frequency of post-closure inspections of CAUs at TTR to an annual frequency. This letter is included in Attachment B. Post-closure inspections were conducted on May 15-16, 2007. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in May 2007, and the vegetation monitoring report is included in Attachment F. Maintenance and/or repairs were performed at CAU 453. Animal burrows observed during the annual inspection at CAU 453 were backfilled on August 1, 2007. At this time, the TTR post-closure site inspections should continue as scheduled. Any potential problem areas previously identified (e.g., areas of erosion, subsidence) should be monitored closely, and periodic vegetation surveys of the vegetated covers should continue.

NSTec Environmental Restoration

2008-06-01T23:59:59.000Z

44

Laboratory services series: a programmed maintenance system  

SciTech Connect (OSTI)

The diverse facilities, operations and equipment at a major national research and development laboratory require a systematic, analytical approach to operating equipment maintenance. A computer-scheduled preventive maintenance program is described including program development, equipment identification, maintenance and inspection instructions, scheduling, personnel, and equipment history.

Tuxbury, D.C.; Srite, B.E.

1980-01-01T23:59:59.000Z

45

Reactive Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Reactive Maintenance Reactive Maintenance Reactive Maintenance October 7, 2013 - 9:40am Addthis Reactive maintenance follows a run-it-until-it-breaks strategy where no actions or efforts are taken to maintain equipment as intended by the manufacturer. Studies indicate this is still the predominant mode of maintenance for Federal facilities. Advantages Reactive maintenance advantages are a double-edged sword. Federal agencies following a purely reactive maintenance strategy can expect little expenditures for manpower or system upkeep until something breaks. However, systems do break. With new equipment, Federal agencies can expect minimal incidents of failure. However, older equipment often experiences higher failure incidents and costlier repairs. Other advantages of reactive maintenance are:

46

Preventive Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Preventive Maintenance Preventive Maintenance Preventive Maintenance October 7, 2013 - 9:44am Addthis Preventive maintenance aims to sustain or extend system lifespan through a set of actions that detect, preclude, or mitigate system degradation. These actions are based on either calendar time or machine run time. Advantages Federal agencies can greatly extend equipment reliability and lifespan by expending the necessary resources for regular maintenance. In most cases, the system designer or manufacturer outlines regular maintenance under a preventive strategy. In addition to increased reliability and lifespan, budget is saved over the life of the system. Preventive maintenance programs can save as much as 12% to 18% in equipment repair and replacement. Other advantages of preventitive maintenance are:

47

2004 Annual Inspection for the  

Office of Legacy Management (LM)

for the for the Parkersburg, West Virginia, Nuclear Waste Policy Act Section 151(c) Disposal Site Summary The Parkersburg, West Virginia, Site was inspected on October 16, 2008, to confirm the integrity of visible features and to determine the need, if any, for maintenance, additional inspections, or monitoring. Results of the inspection conclude that the site is in excellent condition. Vegetation control activities (mow and spray) have been effective in reducing the populations of weed species present at the site. An area of poison hemlock re-growth and an area of poison ivy were identified during the inspection. Although the site is currently mowed twice a year, the grass was rather high at the time of the inspection. It is recommended that the frequency of

48

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2011  

SciTech Connect (OSTI)

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2011 and includes inspection and repair activities completed at the following CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 453: Area 9 UXO Landfill (TTR); and (5) CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Appendix B. The inspection checklists are included in Appendix C, field notes are included in Appendix D, and photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted May 3 and 4, 2011. Maintenance was performed at CAU 424, CAU 453, and CAU 487. At CAU 424, two surface grade monuments at Landfill Cell A3-3 could not be located during the inspection. The two monuments were located and marked with lava rock on July 13, 2011. At CAU 453, there was evidence of animal burrowing. Animal burrows were backfilled on July 13, 2011. At CAU 487, one use restriction warning sign was missing, and wording was faded on the remaining signs. A large animal burrow was also present. The signs were replaced, and the animal burrow was backfilled on July 12, 2011. As a best management practice, the use restriction warning signs at CAU 407 were replaced with standard Federal Facility Agreement and Consent Order signs on July 13, 2011. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2011, and the vegetation monitoring report is included in Appendix F.

NSTec Environmental Restoration

2012-02-21T23:59:59.000Z

49

Turbine repair at Nesjavellir geothermal power plant: An Icelandic case study  

Science Journals Connector (OSTI)

Abstract During a quadrennial inspection of a 30 MW Mitsubishi steam turbine at Nesjavellir geothermal power plant, corrosion products were found on the last set of labyrinth packing in the gland seal system which resulted in erosion corrosion of the turbine rotor. The rotor had worn by approximately 8 mm. Because of the tight timeframe of the overhaul, it was decided to repair this failure on site using the experience of the staff and domestic industry. Labyrinth seals were built by a domestic machine shop, decreasing cost and shutdown time dramatically. This article describes the occurring failure and how it was repaired within days with cooperation between the energy company and domestic industry. It further discusses probable causes for such failure and how it may be prevented. The article describes in essence how valuable it can prove to build maintenance knowledge domestically in the geothermal sector.

R.S. Atlason; A. Gunnarsson; R. Unnthorsson

2015-01-01T23:59:59.000Z

50

Managed operation and repair of a deteriorating large diameter pipeline  

SciTech Connect (OSTI)

Since 1986, Brandon Shores Generating Station has successfully managed a recurring maintenance problem with the buried prestressed concrete cylinder pipe (PCCP) of its circulating water system. It is the intent of this paper to provide a history of the plant`s approach to safely operating and maintaining the deteriorating pipe of this system. This paper will briefly discuss the results of failure analysis performed on the ruptured pipe. Findings of engineering studies addressing the structural integrity of the remaining pipeline will be discussed. The inspection methodology used at Brandon Shores to periodically assess the pipe will be described. Several methods of pipe repair, both external and internal will be detailed. Particular focus will be placed on an internal repair design successfully implemented on two pipe sections during a 1993 plant outage. This internal repair resulted in no loss of hydraulic section, and was erected in-place using conventional materials which were entirely transported through 36 inch manholes. The pipeline was placed back in service and has performed satisfactorily to date.

Cramblitt, K.L. [Baltimore Gas and Electric Company, Baltimore, MD (United States); Lawson, T.J. [Construction Technology Laboratories Inc., Skokie, IL (United States); Ciolko, A.T. [Construction Technology Labs. Inc., Skokie, IL (United States)

1996-07-01T23:59:59.000Z

51

Enhancing pipeline integrity through internal inspection  

SciTech Connect (OSTI)

A pipeline operating company with an 8,000 mile liquid petroleum distribution system reviews the costs and results of the past ten-year, internal inspection program. A comparison of total inspection and repair costs and repair rates are presented for twenty mainline sections. Comparisons are also made for five different internal inspection contractors and for inspection tools of the first and second generation. The effects of cost in comparison to pipeline length, coating condition, and the location of a line in urban or rural environments are analyzed. The effects this program has had on the number of corrosion leaks are also analyzed. Also, a conclusion is made as to the program`s impact on pipeline integrity.

Turner, D.R. [Williams Pipe Line Co., Tulsa, OK (United States)

1996-08-01T23:59:59.000Z

52

Reactive Maintenance  

Broader source: Energy.gov [DOE]

Reactive maintenance follows a run-it-until-it-breaks strategy where no actions or efforts are taken to maintain equipment as intended by the manufacturer. Studies indicate this is still the predominant mode of maintenance for Federal facilities.

53

Update on pipeline repair methods  

SciTech Connect (OSTI)

A comprehensive review of pipeline repair methods has been recently completed under the sponsorship of the American Gas Association`s, Pipeline Research Committee. This paper is intended to summarize the important results of that review. First and foremost, two relatively new methods of repair are reviewed. One involves the use of a continuous-fiber fiberglass composite material which can be applied as an alternative to a steel sleeve for the reinforcement of nonleaking defects. The second is the use of deposited weld metal to replace metal lost to external corrosion. This latter technique is not new in principle, but recent research has shown how it can be done safely on a pressurized pipeline. The other significant outcome of the comprehensive review was a set of guidelines for using all types of repairs including full-encirclement sleeves and repair clamps. Pipeline operators can use these guidelines to enhance their current repair procedures, or to train new personnel in maintenance techniques.

Kiefner, J.F. [Kiefner and Associates, Inc., Worthington, OH (United States); Bruce, W.A. [Edison Welding Inst., Columbus, OH (United States); Stephens, D.R. [Battelle, Columbus, OH (United States)

1995-12-31T23:59:59.000Z

54

Constrained-cost maintenance and measurability of degradation  

Science Journals Connector (OSTI)

......the timing problem of when to repair and the neural net handles which bridges in the net- work to repair. MAINTENANCE AND MEASURABILITY...track, bridge, or stretch of pipeline--is classified as being...chosen one of a finite set R of repair actions. The transition probability......

J. I. ANSELL; T. W. ARCHIBALD; L. C. THOMAS

1998-03-01T23:59:59.000Z

55

Coal bunker repairs  

SciTech Connect (OSTI)

Detroit Edison's St. Clair Power Plant (STCPP) Units 1 through 4 are 1950's vintage fossil fueled units with an average capacity of 163 megawatt per unit. Each unit had identical 2190 ton bunkers. The Unit No. 1 bunker had been experiencing noticeable exterior deterioration at the lower level internal support system. An internal bunker inspection revealed large deflections in the network of beams supporting the bunker side walls. A complete collapse of the internal support beams was imminent. Failure of these beams would have transferred the coal pressure loads to the bunker skin and external stiffeners which were not capable of sustaining the load and were also showing signs of distress. This paper presents the temporary repair installed immediately after inspection, the redesign of the lower internal support system and construction procedures involved in bringing the bunker back into operating condition.

Emmons, M.H.; Hoffman, M.G. (Detroit Edison Co., MI (United States))

1992-01-01T23:59:59.000Z

56

Chemical Fume Hood Maintenance, Repair and Certification  

E-Print Network [OSTI]

system (e.g., motor, belts, fan unit and electrical connections). c. Notify PI and research personnel of chemical fume hoods (CFH) at Columbia University. This includes performance testing, reporting) Engineering controls are a critical component of protection against workplace hazards, removing the hazard

Jia, Songtao

57

Development of Machine Vision Technology for Railcar Safety Appliance Inspection  

E-Print Network [OSTI]

American trains depart a terminal or rail yard, many aspects of the cars and locomotives undergo inspection the algorithm the differences between safety appliance defects that require immediate repair, and other types capable of inspecting safety appliance defects on passing railcars. Index Terms: Machine Vision, Railcar

Barkan, Christopher P.L.

58

Risk aversion in maintenance: a utility-based approach  

Science Journals Connector (OSTI)

......2005), who derives an inspection policy for a standby electric generator, when repair time is not negligible. The earliest...extended service contracts: theory and an applica- tion to automobiles. Market. Sci., 12, 230247. PFANZAGL, J. (1959) A......

Rose Baker

2010-10-01T23:59:59.000Z

59

Federal Energy Management Program: Maintenance Types  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Maintenance Types Maintenance Types Proper operations and maintenance (O&M) goes beyond repairing equipment after it breaks. Several maintenance strategies exist to prevent systems disrepair and degradation. A combination of the following can ensure an optimal blend of cost and life-cycle effectiveness: Reactive Maintenance: Follows a "run it until it breaks" strategy. No action or effort is taken to maintain equipment, prevent failure, or ensure life of the system - even if actions are suggested by the manufacturer. Preventive Maintenance: Refers to a series of actions performed on calendar time or machine run time schedules. Predictive Maintenance: Strives to detect the onset of equipment degradation and address the problems as they are identified. Several predictive maintenance technologies exist.

60

Operations & Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Contact Information Transmission Planning Western OATT Revision Maintenance Services Meter policy (pdf) Meter application agreement Behind the Meter Generation policy (doc)...

Note: This page contains sample records for the topic "inspection maintenance repairs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Monthly Tank Inspection Log Name of Campus  

E-Print Network [OSTI]

Monthly Tank Inspection Log Name of Campus Street Address of Campus City, State, and Zip Code of Campus 1 of 2 1. Facility PBS Registration Number 6. DISTRIBUTE TO : 2. Tank Number 3. Tank Registered(S) Satisfactory Repair or Adjustment Required Not Applicable Additional Comments Attached ABOVEGROUND STORAGE TANK

Rosen, Jay

62

Design and demonstration of an analysis Information system for magnetic flux leakage inspection of natural gas pipeline. Final letter report  

SciTech Connect (OSTI)

A staff exchange was conducted for the mutual benefit of the Department of Energy, the Gas Research Institute (GRI), Vetco Pipeline Services Inc. (VPSI), and the Pacific Northwest National Laboratory. This staff exchange provided direct exposure by a Laboratory staff member knowledgeable in inspection, integrity assessment, and robotic capabilities of the Laboratory to the needs of the natural gas pipeline industry. The project included an assignment to the GRI Pipeline Simulation Facility (PSF) during the period preceding the commissioning of the flow loop. GRI is interested in exploiting advanced technology at the National Laboratories. To provide a sense of the market impact, it is estimated that $3 billion was spent in 1993 for the repair, renovation, and replacement of distribution piping. GRI has goals of saving the distribution industry $500 million in Operations and Maintenance costs and having an additional $250M savings impact on transmission pipelines. The objectives of the project included: (1) For PNNL staff to present technology to GRI and PSF staff on non- destructive evaluation, robotics, ground penetrating radar, and risk based inspection guidelines for application to the operation and maintenance of natural gas pipelines. (2) For GRI and PSF staff to discuss with PNNL staff opportunities for improving the industrial competitiveness of operation and maintenance services. (3) To explore the basis for partnership with GRI and PSF staff on technology transfer topics. In this project, staff exchanges were conducted to GRI`s Pipeline Simulation Facility and to VPSI. PNNL . staff had access to the $10M GRI Pipeline Simulation Facility (PSF) at West Jefferson, Ohio. The facility has a 4,700-ft. long pipe loop, an NDE laboratory, and a data analysis laboratory. PNNL staff had access to the VPSI`s facility in Houston, TX. VPSI has developed some of the most sophisticated inspection tools currently used in the pipeline inspection industry.

Schuster, G.J.; Saffell, B.A.

1996-10-01T23:59:59.000Z

63

ROBOTIC TANK INSPECTION END EFFECTOR  

SciTech Connect (OSTI)

The objective of this contract between Oceaneering Space Systems (OSS) and the Department of Energy (DOE) was to provide a tool for the DOE to inspect the inside tank walls of underground radioactive waste storage tanks in their tank farms. Some of these tanks are suspected to have leaks, but the harsh nature of the environment within the tanks precludes human inspection of tank walls. As a result of these conditions only a few inspection methods can fulfill this task. Of the methods available, OSS chose to pursue Alternating Current Field Measurement (ACFM), because it does not require clean surfaces for inspection, nor any contact with the Surface being inspected, and introduces no extra by-products in the inspection process (no coupling fluids or residues are left behind). The tool produced by OSS is the Robotic Tank Inspection End Effector (RTIEE), which is initially deployed on the tip of the Light Duty Utility Arm (LDUA). The RTEE combines ACFM with a color video camera for both electromagnetic and visual inspection The complete package consists of an end effector, its corresponding electronics and software, and a user's manual to guide the operator through an inspection. The system has both coarse and fine inspection modes and allows the user to catalog defects and suspected areas of leakage in a database for further examination, which may lead to emptying the tank for repair, decommissioning, etc.. The following is an updated report to OSS document OSS-21100-7002, which was submitted in 1995. During the course of the contract, two related subtasks arose, the Wall and Coating Thickness Sensor and the Vacuum Scarifying and Sampling Tool Assembly. The first of these subtasks was intended to evaluate the corrosion and wall thinning of 55-gallon steel drums. The second was retrieved and characterized the waste material trapped inside the annulus region of the underground tanks on the DOE's tank farms. While these subtasks were derived from the original intent of the contract, the focus remains on the RTIEE.

Rachel Landry

1999-10-01T23:59:59.000Z

64

Development of an Efficient Maintenance Scheme for Peak Efficiency of Boilers  

E-Print Network [OSTI]

Abstract––Presently the world has enormous advancement in science and technology the topic considered here is just a drop out of an ocean of knowledge. Higher product quality, better reliability, better availability of plants, optimization of cost and efficient working of boilers is the chief concern now a days. Generally the production can be increased by the efficient use of boilers and hence there is a lot of scope to minimize the boiler operation cost. A boiler maintenance improvement program must include two aspects: (1) action to bring the boiler to peak efficiency and (2) action to maintain the efficiency at the maximum level. Good maintenance and efficiency start with having a working knowledge of the components associated with the boiler, keeping records, etc., and end with cleaning heat transfer surfaces, adjusting the air-to-fuel ratio, etc. A well-planned maintenance program avoids unnecessary down time or costly repairs. It also promotes safety and aids boiler code and local inspectors. An inspection schedule listing the procedures should be established. Thus in this paper an attempt is made to develop an efficient maintenance scheme by which boilers can be used with peak efficiency.

Amit Kumar Jain; Anupam Singhal

65

Preventive Maintenance  

Broader source: Energy.gov [DOE]

Preventive maintenance aims to sustain and/or extend system lifespan through a set of actions that detect, preclude, or mitigate system degradation. These actions are based on either calendar time or machine run time.

66

Predictive Maintenance  

Broader source: Energy.gov [DOE]

Predictive maintenance aims to detect equipment degradation and address problems as they arise. The result indicates potential issues, which are controlled or eliminated prior to any significant system deterioration.

67

The Cable Repair Ship H.M.T.S. Monarch  

Science Journals Connector (OSTI)

... -6), members of the general public had an opportunity of inspecting the Post Office cable repair ship Monarch, which was lying in the Thames off the Tower. This ship ... fitted out with the special gear necessary for carrying out all the operations required in cable laying and repair, on which service she is at sea for most of the ...

1934-10-06T23:59:59.000Z

68

F Reactor Inspection  

ScienceCinema (OSTI)

Workers from Mission Support Alliance, LLC., removed the welds around the steel door of the F Reactor before stepping inside the reactor to complete its periodic inspection. This is the first time the Department of Energy (DOE) has had the reactor open since 2008. The F Reactor is one of nine reactors along the Columbia River at the Department's Hanford Site in southeastern Washington State, where environmental cleanup has been ongoing since 1989. As part of the Tri-Party Agreement, the Department completes surveillance and maintenance activities of cocooned reactors periodically to evaluate the structural integrity of the safe storage enclosure and to ensure confinement of any remaining hazardous materials. "This entry marks a transition of sorts because the Hanford Long-Term Stewardship Program, for the first time, was responsible for conducting the entry and surveillance and maintenance activities," said Keith Grindstaff, Energy Department Long-Term Stewardship Program Manager. "As the River Corridor cleanup work is completed and transitioned to long-term stewardship, our program will manage any on-going requirements."

Grindstaff, Keith; Hathaway, Boyd; Wilson, Mike

2014-11-24T23:59:59.000Z

69

F Reactor Inspection  

SciTech Connect (OSTI)

Workers from Mission Support Alliance, LLC., removed the welds around the steel door of the F Reactor before stepping inside the reactor to complete its periodic inspection. This is the first time the Department of Energy (DOE) has had the reactor open since 2008. The F Reactor is one of nine reactors along the Columbia River at the Department's Hanford Site in southeastern Washington State, where environmental cleanup has been ongoing since 1989. As part of the Tri-Party Agreement, the Department completes surveillance and maintenance activities of cocooned reactors periodically to evaluate the structural integrity of the safe storage enclosure and to ensure confinement of any remaining hazardous materials. "This entry marks a transition of sorts because the Hanford Long-Term Stewardship Program, for the first time, was responsible for conducting the entry and surveillance and maintenance activities," said Keith Grindstaff, Energy Department Long-Term Stewardship Program Manager. "As the River Corridor cleanup work is completed and transitioned to long-term stewardship, our program will manage any on-going requirements."

Grindstaff, Keith; Hathaway, Boyd; Wilson, Mike

2014-10-29T23:59:59.000Z

70

Maintenance and Operations of Schools for Energy Efficiency  

E-Print Network [OSTI]

in more than 100 Texas public school districts. The most commonly observed problems in maintaining and operating public schools for energy efficiency are presented along with successful basic methods of inspecting schools for energy efficient maintenance...

McClure, J. D.; Estes, J. M.

1986-01-01T23:59:59.000Z

71

Reliability-Centered Maintenance  

Broader source: Energy.gov [DOE]

Reliability-centered maintenance leverages the same practices and technologies of predictive maintenance.

72

Pacific Northwest Laboratory Maintenance Implementation plan  

SciTech Connect (OSTI)

This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

Bright, J.D.

1992-06-01T23:59:59.000Z

73

Pacific Northwest Laboratory Maintenance Implementation plan  

SciTech Connect (OSTI)

This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory`s (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number_sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services` current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

Bright, J.D.

1992-06-01T23:59:59.000Z

74

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Chapter 5 Types of Maintenance Programs Chapter 5 Types of Maintenance Programs � 5.1 Introduction What is maintenance and why is it performed? Past and current maintenance practices in both the private and government sectors would imply that maintenance is the actions associated with equipment repair after it is broken. The dictionary defines maintenance as follows: "the work of keeping something in proper condition; upkeep." This would imply that maintenance should be actions taken to prevent a device or component from failing or to repair normal equipment degradation experienced with the operation of the device to keep it in proper working order. Unfortunately, data obtained in many studies over the past decade indicates that most private and government facilities do not expend the necessary resources to maintain equipment in proper working

75

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: Energy.gov (indexed) [DOE]

Chapter 5 Types of Maintenance Programs Chapter 5 Types of Maintenance Programs � 5.1 Introduction What is maintenance and why is it performed? Past and current maintenance practices in both the private and government sectors would imply that maintenance is the actions associated with equipment repair after it is broken. The dictionary defines maintenance as follows: "the work of keeping something in proper condition; upkeep." This would imply that maintenance should be actions taken to prevent a device or component from failing or to repair normal equipment degradation experienced with the operation of the device to keep it in proper working order. Unfortunately, data obtained in many studies over the past decade indicates that most private and government facilities do not expend the necessary resources to maintain equipment in proper working

76

Appendix B Landfill Inspection Forms and Survey Data  

Office of Legacy Management (LM)

B B Landfill Inspection Forms and Survey Data This page intentionally left blank This page intentionally left blank Original Landfill January 2012 Monthly Inspection-Attachment 1 The monthly inspection of the OLF was completed on January 30. The Rocky Flats Site only received .15 inches of precipitation during the month of January. The cover was dry at the time of the inspection. The slump in the East Perimeter Channel (EPC) remained unchanged. Berm locations that were re-graded during the OLF Maintenance 2011 Project remained in good condition. Vegetation on the landfill cover including the seep areas remains dormant. OLF Cover Lower OLF Cover Facing East Upper OLF Cover Facing East

77

INL Sitewide Operations and Maintenance Report for CERCLA Response Actions - FY 2005  

SciTech Connect (OSTI)

This report documents how remedies mandated by the Comprehensive Environmental Response, Compensation, and Liability Act for the Idaho National Laboratory Site were operated and maintained during fiscal year 2005. The activities addressed in the INEEL Sitewide Operations and Maintenance Plan are reported in this document. Waste Area Groups 7 and 8 are not reported in this document. Waste Area Group 7 is an operating facility, and the status of its operations is reported directly to the regulatory agencies. Waste Area Group 8 is excluded from this report, because it falls outside the direct control of U.S. Department of Energy Idaho Operations Office. The INEEL Sitewide Institutional Controls Plan discusses the inspection, maintenance, repair, and reporting activities involving institutional controls at the Idaho National Laboratory Site. Therefore, the maintenance of institutional controls is not discussed in this report. The Idaho National Engineering and Environmental Laboratory Comprehensive Facilities and Land Use Plan provides a reference to support this report by providing current and projected facility and land uses and by listing the Comprehensive Environmental Response, Compensation, and Liability Act sites.

D. R. Fitch

2005-09-22T23:59:59.000Z

78

Integrated structural repair of a producing FPSO  

SciTech Connect (OSTI)

The state of the art in FPSO design is advancing rapidly. The long-term reliability of FPSO systems has improved as maintenance issues, have received greater emphasis in both new-builds and conversions. Despite this new emphasis, problems will still arise and repairs will still be required. Ultimately, the ability of any FPSO to stay on location and on production will depend on the scope of repairs which can be economically performed in-situ. In 1994 and 1995, Marathon Petroleum Indonesia Limited (MPIL) performed an in-situ repair on the FPSO Kakap Natuna. The scope and complexity of this work suggests there are few, if any, limits on in-situ structural repairs which can be successfully performed on a producing FPSO. The use of an integrated execution strategy for the repairs greatly reduced their cost.

Johnson, P.R. [Marathon Oil Co., Houston, TX (United States); Smith, T.A. [Aker Omega Inc., Houston, TX (United States)

1997-07-01T23:59:59.000Z

79

User Electrical Inspection Criteria  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

User Electronic and Electrical Equipment Inspection Criteria User Electronic and Electrical Equipment Inspection Criteria Any electrical or electronic equipment users bring to the APS will have to be inspected. In some cases, this inspection will be quite simple, e.g., if the equipment has already been inspected by a Nationally Recognized Testing Laboratory (NRTL) and is used for its designed purpose. Other equipment will require a more thorough inspection (this may include NRTL inspected equipment if it is assembled into an apparatus with other components). The inspection is based on an eight-part list of criteria. Paraphrased, those criteria are: The equipment must be suitable for its intended use (and if appropriate, installation). For example, a heater controller intended to control a 1000W heater cannot be used to control a 2000W heater. The

80

Operation and Maintenance  

E-Print Network [OSTI]

. . . . . . . . . . . . . . . . . . . . . . . . . . . .6 Final inspection checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 Charging With Refrigerant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Calculating R410A cha

van Hemmen, J. Leo

Note: This page contains sample records for the topic "inspection maintenance repairs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

INTERNAL REPAIR OF PIPELINES  

SciTech Connect (OSTI)

The two broad categories of deposited weld metal repair and fiber-reinforced composite repair technologies were reviewed for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Preliminary test programs were developed for both deposited weld metal repairs and for fiber-reinforced composite repair. To date, all of the experimental work pertaining to the evaluation of potential repair methods has focused on fiber-reinforced composite repairs. Hydrostatic testing was also conducted on four pipeline sections with simulated corrosion damage: two with composite liners and two without.

Robin Gordon; Bill Bruce; Nancy Porter; Mike Sullivan; Chris Neary

2003-05-01T23:59:59.000Z

82

Improving aircraft composite inspections using optimized reference standards  

SciTech Connect (OSTI)

The rapidly increasing use of composites on commercial airplanes coupled with the potential for economic savings associated with their use in aircraft structures means that the demand for composite materials technology will continue to increase. Inspecting these composite structures is a critical element in assuring this continued airworthiness. The FAA`s Airworthiness Assurance NDI Validation Center, in conjunction with the Commercial Aircraft Composite Repair committee, is developing a set of composite reference standards to be used in NDT equipment calibration for accomplishment of damage assessment and post-repair inspection of all commercial aircraft composites. In this program, a series of NDI tests on a matrix of composite aircraft structures and prototype reference standards were completed in order to minimize the number of standards needed to carry out composite inspections on aircraft. Two tasks, related to composite laminates and non-metallic composite honeycomb configurations, were addressed.

Roach, D.; Dorrell, L. [Sandia National Labs., Albuquerque, NM (United States). FAA Airworthiness Assurance NDI Validation Center; Kollgaard, J. [Boeing Commercial Aircraft Co., Seattle, WA (United States); Dreher, T. [United Airlines (United States)

1998-10-01T23:59:59.000Z

83

CRAD, Performance-Based Inspection - November 29, 2011 | Department of  

Broader source: Energy.gov (indexed) [DOE]

Performance-Based Inspection - November 29, 2011 Performance-Based Inspection - November 29, 2011 CRAD, Performance-Based Inspection - November 29, 2011 November 20, 2011 Performance-Based Inspection of Environmental Management Systems: Inspection Criteria, approach, and Lines of Inquiry (HSS CRAD 45-38, Rev. 1) The following provides an overview of the typical activities that will be performed to collect information to evaluate the effectiveness of the environmental management system. Several terms used throughout this document are defined (last three terms based on ISO 14001 :2004(E) Section 3, Terms and Definitions) as follows: The term "activities" encompasses various types of projects including construction, restoration, maintenance, operations, research and development (R&D), and other work activities that could expose the workers,

84

Home Inspection Checklist.  

E-Print Network [OSTI]

the checklist in advance so you will know what you need to inspect at each home. In addition to the checklist, bring the tools to do the job. These include a clip board, paper, pencil, pocket knife, flashlight, tape measure, screwdriver, electrical circuit... tester and binoculars. Consider a Professional Inspection If you have satisfied your own general expectations and are planning on buying a particular home, consider having a professional inspection. As you choose a professional inspector for the job...

Quiring, Susan M.

1987-01-01T23:59:59.000Z

85

Microsoft Word - maintenance  

Broader source: Energy.gov (indexed) [DOE]

System Maintenance Checklist System Maintenance Checklist The following checklist is intended to provide system owners, project managers and other information system developers and maintainers with guidance in identifying and planning system maintenance activities. The objectives of system maintenance are summarized as: C Resolution of errors, faults, and failures. C The requirements for system maintenance initiates lifecycle changes. The change is remapped and executed, thereby treating the maintenance process as iterations of development. Rev: 09/02 1 Maintenance Checklist SEM Reference Comments " A procedure exists for handling emergency changes that cannot be implemented as part of a scheduled release. Chapter 10 Maintenance " An identification number is assigned to the modification.

86

Inspection Report: IG-0774  

Broader source: Energy.gov (indexed) [DOE]

Inspection Report Inspection Report Material Control and Accountability at Los Alamos National Laboratory DOE/IG-0774 September 2007 U.S. Department of Energy Office of Inspector General Office of Inspections and Special Inquiries Department of Energy Washington, DC 20585 September 7,2007 MEMORANDUM FOR FROM: Insp~ct& General SUBJECT: INFORMATION: Inspection Report on "Material Control and Accountability at Los Alamos National Laboratory" BACKGROUND The Department of Energy's Los Alamos National Laboratory (LANL) has a national security mission that includes responsibility for the science, engineering and technology related to certain radioactive materials supporting the Nation's nuclear weapons program. These include materials

87

Optical fiber inspection system  

DOE Patents [OSTI]

A remote optical inspection system including an inspection head. The inspection head has a passageway through which pellets or other objects are passed. A window is provided along the passageway through which light is beamed against the objects being inspected. A plurality of lens assemblies are arranged about the window so that reflected light can be gathered and transferred to a plurality of coherent optical fiber light guides. The light guides transfer the light images to a television or other image transducer which converts the optical images into a representative electronic signal. The electronic signal can then be displayed on a signal viewer such as a television monitor for inspection by a person. A staging means can be used to support the objects for viewing through the window. Routing means can be used to direct inspected objects into appropriate exit passages for accepted or rejected objects. The inspected objects are advantageously fed in a singular manner to the staging means and routing means. The inspection system is advantageously used in an enclosure when toxic or hazardous materials are being inspected. 10 figs.

Moore, F.W.

1985-04-05T23:59:59.000Z

88

User Electrical Equipment Inspections  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

User Electronic and Electrical Equipment Inspection Criteria In order to be in compliance with NEC, OSHA, and DOE regulations all electronic and electrical equipment at the APS...

89

Design of multifunctional paired robots engaged across a thin plate for aircraft manufacturing and maintenance  

E-Print Network [OSTI]

The aircraft industry lacks an automated system for wing box manufacturing and maintenance. Currently workers assemble and inspect thousands of fasteners in the wing structure by hand. This manufacturing process consumes ...

Karasic, Geoffrey Ian

2011-01-01T23:59:59.000Z

90

The use of differential GPS as an inspection tool in the external corrosion control of buried pipelines  

SciTech Connect (OSTI)

A maintenance program was designed to improve the cathodic protection level of two oil gathering pipelines of an oil production facility in Eastern Venezuela. The program was built upon the information obtained from a coating condition evaluation and the soil resistivity profile along the pipeline corridors. The external coating was inspected with the Direct Current Voltage Gradient technique, DCVG; the soil resistivity of the pipeline corridor was measured every 100 meters (328 ft.). All the geographical information was obtained with Differential Global Positioning System (DGPS). This allowed the pipeline operator to relocate all coating defects with a sub metric accuracy that considerably reduced the rehabilitation costs. The coating inspection covered a total distance of twelve thousand, nine hundred and thirty-six meters (12,936 meters). Two hundred and ninety two (292) defects were found; 54 defects belonged to Category 3 and will need immediate repair. The soil corrosiveness along the pipeline corridors was established by the resistivity gradient. Critical areas were established and exploratory digs were recommended to assess exposed metal condition.

Kowalski, A.R. [Asesoria Adiestramiento y Construccion, Caracas (Venezuela)

1998-12-31T23:59:59.000Z

91

Determining pipeline fitness for purpose from high resolution smart pig inspections  

SciTech Connect (OSTI)

To gain a financial benefit, a smart operator views inspection as part of an overall strategy to maintain a safe pipeline. This paper shows how periodic internal inspections, followed by defect assessments using fitness-for-purpose criteria and selective repair, is the most cost beneficial way of maintaining the safety of a pipeline. It is highlighted that it is important to use (1) genuine high resolution pigs for the inspection and (2) expert fitness-for-purpose assessment. The cost savings on the optimized future safe operating strategies for the pipeline offset the costs of the inspection and expert assessment. 48 refs., 8 figs., 2 tabs.

Grimes, K. [British Gas plc, Houston, TX (United States); Jones, D.G. [British Gas plc, Cramlington (United Kingdom). Pipeline Integrity International

1996-08-01T23:59:59.000Z

92

Predictive Maintenance Technologies  

Broader source: Energy.gov [DOE]

Several diagnostic technologies and best practices are available to assist Federal agencies with predictive maintenance programs.

93

Microsoft Word - Appendix H - InspectionChecklist.doc  

Office of Legacy Management (LM)

H H Annual Inspection Checklist U.S. Department of Energy Weldon Spring Site LTS&M Plan July 2005 Doc. No. S0079000 Page H-3 Annual Site Inspection Checklist Purpose of the Checklist This checklist has been developed from the EPA guidance document Comprehensive Five Year Review Guidance dated June 2001 (OSWER No. 9355.7-03B-P) and from Section 2.3 of the Long-Term Surveillance and Maintenance Plan for the Weldon Spring, Missouri, Site. The checklist was modified to site-specific conditions as recommended by the guidance document. The checklist will be completed annually during the Weldon Spring Site annual surveillance and maintenance inspection. The checklist will also be used to assist in compiling information for the five-year review.

94

SNORKEL PRO-66 DAILY INSPECTION AND MAINTENANCE CHECKLIST  

E-Print Network [OSTI]

not be operated if not in proper mechanical condition. All defects must be reported to the Electric Shop Foreman is to be returned to the BMC Electric Shop at the end of the day or the end of the job, whichever comes first. Beginning Hours: ______________ Ending Hours: ______________ Fuel (DIESEL): ________gallons List all

Gelfond, Michael

95

Accounting for inspection errors and change in maintenance behaviour  

Science Journals Connector (OSTI)

......also present a Bayesian analysis of the problem which can...problem occurring with Reactor Coolant in EDF Nuclear...following years. Statistical analysis of the reliability of 900 MW and 1300 MW reactor coolant pumps + Corresponding......

Gilles Celeux; Franck Corset; Marie-Agnès Garnero; Christelle Breuils

2002-01-01T23:59:59.000Z

96

POST-DEACTIVATION SURVEILLANCE AND MAINTENANCE PLANNING  

Broader source: Energy.gov (indexed) [DOE]

POST-DEACTIVATION SURVEILLANCE AND POST-DEACTIVATION SURVEILLANCE AND MAINTENANCE PLANNING Post-Deactivation Surveillance and Maintenance Planning Dependence of End-Points Planning on S&M Planning Primary Surveillance Concerns Typical Deactivation S&M Plan Contents Example of a Post-Deactivation S&M Plan Dependence of End-Points Planning on S&M Planning One of the key elements of end-point planning is knowing what the post-deactivation S&M activities will be so that conditions can be established to support them. The post-deactivation S&M plan specifies the surveillance, inspection, and maintenance of the facility in the deactivated state. It should address the activities, the locations in which they will be conducted, and their frequency. Part of the S&M planning is

97

LWP-[XXX] or MCP-[XXX  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

operations, environmental remediation, maintenance and repair, administration, safety software developmentvalidationtesting and use, inspection, safeguards and security, and...

98

Microsoft Word - Appendix E - Erosion Control M&M Inspection Procedure.docx  

Office of Legacy Management (LM)

Rocky Flats, Colorado, Site Rocky Flats, Colorado, Site Erosion Control Monitoring and Maintenance Inspection Procedure This page intentionally left blank LMS/RFS/S04532 Rocky Flats, Colorado, Site Erosion Control Monitoring and Maintenance Inspection Procedure April 2012 This page intentionally left blank U.S. Department of Energy Rocky Flats Erosion Control Monitoring and Maintenance Inspection Procedure April 2012 Doc. No. S04532 Page 1 1.0 Introduction The Erosion Control Plan for Rocky Flats Property Central Operable Unit (DOE 2007) addresses the best management practices (BMPs) to adequately control storm water runoff of soils that could ultimately discharge into surface water. Under the Erosion Control Plan, inspections of the implemented BMP erosion control measures must be conducted on a regular

99

CRAD, Safety Systems Inspection Criteria - December 17, 2012 | Department  

Broader source: Energy.gov (indexed) [DOE]

Systems Inspection Criteria - December 17, 2012 Systems Inspection Criteria - December 17, 2012 CRAD, Safety Systems Inspection Criteria - December 17, 2012 December 17, 2012 Safety Systems Inspection Criteria in implementing Integrated Safety Management, (HSS CRAD 45-11, Rev. 3) The review of Safety Systems will evaluate the effectiveness of programs and processes for engineering design and safety basis, construction and installation, configuration management, surveillance testing, maintenance, operations, cognizant system engineer (CSE) and safety system oversight (SSO), and feedback and improvement of selected safety systems. The review will also evaluate the effectiveness in maintaining the functionality and reliability of these safety systems. The review of Safety Systems will be performed in the context of integrated safety management (ISM), although

100

Essential Systems Functionality Inspection Criteria, Approach, and Lines of  

Broader source: Energy.gov (indexed) [DOE]

Essential Systems Functionality Inspection Criteria, Approach, and Essential Systems Functionality Inspection Criteria, Approach, and Lines of Inquiry, October 16, 2008 (HSS CRAD 64-11 Rev. 2) Essential Systems Functionality Inspection Criteria, Approach, and Lines of Inquiry, October 16, 2008 (HSS CRAD 64-11 Rev. 2) The Essential Systems Functionality (ESF) inspection will evaluate the effectiveness of programs and processes for engineering design and safety basis, construction and installation, configuration management, surveillance testing, maintenance, operations, cognizant system engineer (CSE) and safety system oversight (SSO), and feedback and improvement of selected safety systems. This review will evaluate the effectiveness in maintaining the functionality of these safety systems. The ESF review will be performed in the context of integrated safety management (ISM), although

Note: This page contains sample records for the topic "inspection maintenance repairs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

A Modelling Framework to Assess Maintenance Policy Performance in Electrical Production Plants  

E-Print Network [OSTI]

, scheduled replacement, etc.), the maintenance echelon (repair on site or in workshop), etc. The decisions of stochastic models of the degradation, failure and repair processes; (Valdez-Flores & Feldman, 1989), pipelines (Hong, 1999), cutting tools (Jeang, 1999), etc.). These models can be grouped into two main

Paris-Sud XI, Université de

102

Computerized Maintenance Management Systems  

Broader source: Energy.gov [DOE]

Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and maintenance (O&M) programs. The software automates most of the logistical functions performed by O&M staff.

103

Maintenance and Veg Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Infrastructure projects Interconnection OASIS OATT Reauthorization of Transmission Line Permits, Maintenance and Vegetation Management on Forest Service Lands in Colorado,...

104

Local collapse of gas pipelines under sleeve repairs  

Science Journals Connector (OSTI)

Local collapse of the pipe wall under full encirclement sleeve reinforcements is associated with breaks and blow outs that cause large gas losses and abrupt depressurisation in gas pipelines. Although these defects do not represent an imminent risk of failure, they should be eliminated because they impede the normal passage of the “instrumented pig” for internal inspection. Four failed repairs were experimentally evaluated, and the effects of different geometric factors were numerically assessed via non-linear numerical modelling of fluid flow and pipe response. All possible causes of the appearance of these defects and measures to minimise their occurrence were evaluated. The position of the repaired portion with respect to the blow out, local geometry of the repair and previous defects, and the amount of gas caught in the interstice between the pipe and the reinforcement, have an important part in the event. The measures for the prevention of this problem involve the use of fillers and improved construction of repair sleeves.

J.L Otegui; S Urquiza; A Rivas; A Trunzo

2000-01-01T23:59:59.000Z

105

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2012  

SciTech Connect (OSTI)

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2012 and includes inspection and repair activities completed at the following CAUs: · CAU 400: Bomblet Pit and Five Points Landfill (TTR) · CAU 407: Roller Coaster RadSafe Area (TTR) · CAU 424: Area 3 Landfill Complexes (TTR) · CAU 453: Area 9 UXO Landfill (TTR) · CAU 487: Thunderwell Site (TTR)

NSTec Environmental Restoration

2013-01-28T23:59:59.000Z

106

Repair of overheating linear accelerator  

SciTech Connect (OSTI)

Los Alamos Neutron Science Center (LANSCE) is a proton accelerator that produces high energy particle beams for experiments. These beams include neutrons and protons for diverse uses including radiography, isotope production, small feature study, lattice vibrations and material science. The Drift Tube Linear Accelerator (DTL) is the first portion of a half mile long linear section of accelerator that raises the beam energy from 750 keV to 100 MeV. In its 31st year of operation (2003), the DTL experienced serious issues. The first problem was the inability to maintain resonant frequency at full power. The second problem was increased occurrences of over-temperature failure of cooling hoses. These shortcomings led to an investigation during the 2003 yearly preventative maintenance shutdown that showed evidence of excessive heating: discolored interior tank walls and coper oxide deposition in the cooling circuits. Since overheating was suspected to be caused by compromised heat transfer, improving that was the focus of the repair effort. Investigations revealed copper oxide flow inhibition and iron oxide scale build up. Acid cleaning was implemented with careful attention to protection of the base metal, selection of components to clean and minimization of exposure times. The effort has been very successful in bringing the accelerator through a complete eight month run cycle allowing an incredible array of scientific experiments to be completed this year (2003-2004). This paper will describe the systems, investigation analysis, repair, return to production and conclusion.

Barkley, Walter; Baldwin, William; Bennett, Gloria; Bitteker, Leo; Borden, Michael; Casados, Jeff; Fitzgerald, Daniel; Gorman, Fred; Johnson, Kenneth; Kurennoy, Sergey; Martinez, Alberto; O’Hara, James; Perez, Edward; Roller, Brandon; Rybarcyk, Lawrence; Stark, Peter; Stockton, Jerry

2004-01-01T23:59:59.000Z

107

Predictive Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Maintenance Maintenance Predictive Maintenance October 7, 2013 - 9:46am Addthis Predictive maintenance aims to detect equipment degradation and address problems as they arise. The result indicates potential issues, which are controlled or eliminated prior to any significant system deterioration. Predictive maintenance differs from preventive maintenance because maintenance is based on the condition of the machine instead of a preset schedule. This eliminates the unneeded maintenance concerns of preventive programs. Several predictive maintenance technologies are available. Federal agencies can leverage a combination of these technologies within their maintenance programs. Advantages A well-executed predictive maintenance program can almost eliminate catastrophic equipment failure because issues are identified and eliminated

108

Inspection Report: IG-0770  

Broader source: Energy.gov (indexed) [DOE]

U.S. Department of Energy U.S. Department of Energy Office of Inspector General Office of Inspections and Special Inquiries Inspection Report Protective Force MK-19 Grenade Launcher Use at the National Nuclear Security Administration's Pantex Facility DOE/IG-0770 July 2007 Department of Energy Washington, DC 20585 July 2 0 , 2007 MEMORANDUM FOR TWSECRETARY FROM: 4- Greg ry . riedman Inspector General SUBJECT: INFORMATION: Inspection Report on "Protective Force MK-19 Grenade Launcher Use at the National Nuclear Security Administration's Pantex Facility" BACKGROUND The National Nuclear Security Administration's (NNSA) Pantex Facility is this Nation's only nuclear weapons assembly and disassembly facility. The nature of such work necessitates the development and implementation of protection strategies based upon the

109

Inspection Report: IG-0746  

Broader source: Energy.gov (indexed) [DOE]

l nspector General l nspector General Office of Inspections and Special Inquiries Inspection Report Work Packages for Site Support Service; at Los Alamos National Laboratory Department of Energy Washington, DC 20585 November 29, 2006 MEMORANDUM FOR TI38 S E C m U R Y FROM: h p Gregor - . riedman Inspector General SUBJECT: INFORMATION: Inspection Report on "Work Packages for Site Support Services at Los Alalnos National Laboratory" The Department of Energy's Los Alarnos National Laboratory (LANL) enhances global security by ensuring the safety and reliability of the U.S. nuclear weapons stockpile; developing technical solutioils to reduce the threat of weapons of mass destnlction; and solving problems related to energy, environn~ent, infrastructure, healtl~, and national security. Site support services at the

110

Inspection Report: IG-0731 | Department of Energy  

Office of Environmental Management (EM)

that is CLASSIFIED. Inspection Report: IG-0731 More Documents & Publications Inspection Report: IG-0619 Inspection Report: IG-0809 Pantex Laser Perimeter Awareness System-IG-0809...

111

Independent Oversight Inspection, Argonne National Laboratory...  

Broader source: Energy.gov (indexed) [DOE]

Inspection, Argonne National Laboratory, Volume 1 - May 2005 Independent Oversight Inspection, Argonne National Laboratory, Volume 1 - May 2005 May 2005 Inspection of Environment,...

112

Independent Oversight Inspection, Office of Secure Transportation...  

Broader source: Energy.gov (indexed) [DOE]

Inspection, Office of Secure Transportation - March 2007 Independent Oversight Inspection, Office of Secure Transportation - March 2007 March 2007 Inspection of Emergency...

113

Independent Oversight Inspection, Pantex Plant - June 2009 |...  

Energy Savers [EERE]

Inspection, Pantex Plant - June 2009 June 2009 Inspection of Environment, Safety, and Health Programs at the Pantex Plant This report documents the results of an inspection of the...

114

Condition assessment methodologies for maintenance and repair decisions  

E-Print Network [OSTI]

be normalized to Gnd: P[T = to i Z = g] = 018 / (018 + 016) = 0. 529 P[T = t( ~ Z = zj&] 0, 471 Those are the posterior probabilities. The new expected losses associated to the actions a, and a, (cf. figure 5) can then be calculated: E[L(ao ~ zo)] = P... of MASTER OF SCIENCE Approved as to style and content by; Glen R. Andersen (Chair of committee) W. Edward Back (Member) I T. P. Y (Member) ytcho Lazarov (Member) hn M. Niedzwecki In rimheadofDep ent) December 1997 Major Subject: Civil...

Bouvier, Charles

2012-06-07T23:59:59.000Z

115

Electric Motor Maintenance & Repair for Long Term Efficiency  

E-Print Network [OSTI]

Energy costs to operate electric motors can be a significant part of an operating budget. For example, a recent survey of California water departments reveals energy costs for pumping and treating water may be 25% of operating costs. Strategies...

Brithinee, W. P.

116

DNA Repair and Genome Maintenance in Bacillus subtilis  

Science Journals Connector (OSTI)

...141). A yeast two-hybrid analysis showed that...480). In bacterial systems, the closest orthologs...DnaG) in a yeast two-hybrid analysis (245). Based...interact by yeast two-hybrid analysis (290). Fully...studied in eukaryotic systems based on studies of viral...

Justin S. Lenhart; Jeremy W. Schroeder; Brian W. Walsh; Lyle A. Simmons

2012-09-01T23:59:59.000Z

117

Engineering Design and Safety Basis Inspection Criteria, Inspection...  

Broader source: Energy.gov (indexed) [DOE]

the Engineering Design and Safety Basis Inspection Criteria, Inspection Activities, and Lines of Inquiry for internal use, which we are also making available on the Office of ES&H...

118

rail inspections matrix  

Broader source: Energy.gov (indexed) [DOE]

COMPARISON OF COMMERCIAL VEHICLE SAFETY ALLIANCE RECOMMENDED NATIONAL PROCEDURES COMPARISON OF COMMERCIAL VEHICLE SAFETY ALLIANCE RECOMMENDED NATIONAL PROCEDURES AND OUT-OF-SERVICE CRITERIA FOR THE ENHANCED SAFETY INSPECTION OF COMERCIAL HIGHWAY VEHICLES TRANSPORTING TRANSURANICS, SPENT NUCLEAR FUEL, AND HIGH LEVEL WASTE TO RAIL INSPECTION STANDARDS -TEC-WG, RAIL TOPIC GROUP 1 Commercial Vehicle Safety Alliance Requirement Applicable Federal Regulation (All 49CFR unless otherwise noted) AAR Rule or Standard Applicable Industry / Regulatory Initiatives / Recommended Practices 1.0 GENERAL 215-RAILROAD FREIGHT CAR SAFETY STANDARDS 221-REAR END MARKING DEVICE-PASSENGER, COMMUTER AND FREIGHT TRAINS 223-SAFETY GLAZING STANDARDS-LOCOMOTIVES, PASSENGER CARS AND CABOOSES 229-RAILROAD LOCOMOTIVE

119

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Hygiene Substation Access Road Repairs  

Broader source: Energy.gov (indexed) [DOE]

Hygiene Substation Access Road Repairs Hygiene Substation Access Road Repairs A. Brief Description of Proposal: Western Area Power Administration proposes to repair the access road/driveway into the Hygiene Substation. There is a low spot in the middle of the driveway that impedes maneuvering oflarge maintenance equipment in and out of the yard. Western plans to fill the low spot with road base and crumbled concrete fill. The Hygiene Substation is located in Boulder County, approximately 2 miles northwest of Longmont, CO (T3N, R69W, Sec 18). All proposed construction will occur within the existing, disturbed substation access road/driveway. B. Number and Title of tile Categorical Exclusion Being Applied: (See text in 10 CFR 1021, Subpart D.) BI.3 Routine maintenance activities and custodial services for buildings, structures,

120

Numerical analysis of corroded pipeline segments revealed by In-Line Inspection tools  

Science Journals Connector (OSTI)

The paper presents computation technology for numerical analysis of multiaxial non-linear stress state of the corroded pipeline segments. Developed computation technology along with the modern In-Line Inspection (ILI) tools gives an opportunity for the transport company experts to predict the high accuracy values of burst and safe maximum pressures of the corroded pipeline segments. It allows a decrease in accidents, to provide maximal economical effectiveness of technical inspection and repair of pipeline networks. Moreover, wide application of computation technology allows to make recommendations to the technical inspection tool companies for improvement of technical specifications of their products.

Vladimir V. Aleshin; Viatcheslav V. Kobyakov; Vadim E. Seleznev

2006-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "inspection maintenance repairs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

2003 Annual Inspection of the  

Office of Legacy Management (LM)

conducted the physical site inspection on September 8, 9 and 10, 2014. J. Nguyen, F. Smith, and D. Dille also participated in portions of the inspection, and EPA and UDEQ...

122

Implementation of automatic inspection system  

E-Print Network [OSTI]

Inspection is the formal examination of a product manufactured by any manufacturing process. Inspection process is critical to all the industries as it ensures that a good quality product reach at the end customers. In ...

Chawla, Yugank

2014-01-01T23:59:59.000Z

123

Operation and Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

hosted by Western and requires a digital certificate and login for full access.) Contact Information Transmission Planning Western OATT Revision Maintenance Services Meter Policy...

124

HVAC Maintenance and Technologies  

Broader source: Energy.gov [DOE]

Presentation covers the HVAC maintenance and technologies, and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

125

Flexible ultrasonic pipe inspection apparatus  

DOE Patents [OSTI]

Pipe crawlers, pipe inspection {open_quotes}rabbits{close_quotes} and similar vehicles are widely used for inspecting the interior surfaces of piping systems, storage tanks and process vessels for damaged or flawed structural features. This paper describes the design of a flexible, modular ultrasonic pipe inspection apparatus.

Jenkins, C.F.; Howard, B.D.

1994-01-01T23:59:59.000Z

126

Maintenance strategies to improve sootblower availability  

SciTech Connect (OSTI)

Sootblowers are electromechanical devices used for removal of ash and slag deposits from boiler tube surfaces. By directing steam, air, or water cleaning medium through a nozzle to remove deposits from boiler tubes, boilers are kept on-line for longer periods of time reducing the need for outages to clean the boiler by mechanical means. Fuel must be burned efficiently to minimize stagging and fouling of the heat transfer surfaces. Tuning the boiler to maximize combustion efficiency should not be limited to optimizing fuel conditions, air-fuel ratios, firing rates, excess air, and over-fire air, but should also include the use of sootblowers. The goal is to know when to clean, and if the cleaning cycle has effectively removed the deposit and increased heat transfer. Today, boiler cleaning technology not only focuses on the impact of the sootblowing system on overall boiler performance, but it also focuses on design improvements that impact an individual sootblower`s performance. Proper sootblower maintenance is an integral part of making existing designs and new designs work. Existing computer technologies provide a viable means of documenting and trending sootblower performance data and maintenance history. The personal computer and the availability of spreadsheet and database software make the task of quantifying sootblower performance data and maintenance history easier to achieve. The difficult task is gathering the proper data to make decisions about sootblowing operations and maintenance. The balance of this paper will discuss typical maintenance practices, and improvements that can be achieved by documenting sootblowing system inspections and maintenance activity using a personal computer database.

Walther, J.M.; Whitehead, B.K.

1996-07-01T23:59:59.000Z

127

Automated Image Processing for the Analysis of DNA Repair Dynamics  

E-Print Network [OSTI]

The efficient repair of cellular DNA is essential for the maintenance and inheritance of genomic information. In order to cope with the high frequency of spontaneous and induced DNA damage, a multitude of repair mechanisms have evolved. These are enabled by a wide range of protein factors specifically recognizing different types of lesions and finally restoring the normal DNA sequence. This work focuses on the repair factor XPC (xeroderma pigmentosum complementation group C), which identifies bulky DNA lesions and initiates their removal via the nucleotide excision repair pathway. The binding of XPC to damaged DNA can be visualized in living cells by following the accumulation of a fluorescent XPC fusion at lesions induced by laser microirradiation in a fluorescence microscope. In this work, an automated image processing pipeline is presented which allows to identify and quantify the accumulation reaction without any user interaction. The image processing pipeline comprises a preprocessing stage where the ima...

Riess, Thorsten; Tomas, Martin; Ferrando-May, Elisa; Merhof, Dorit

2011-01-01T23:59:59.000Z

128

CRAD, Performance-Based Inspection - November 29, 2011 | Department of  

Broader source: Energy.gov (indexed) [DOE]

November 29, 2011 November 29, 2011 CRAD, Performance-Based Inspection - November 29, 2011 November 20, 2011 Performance-Based Inspection of Environmental Management Systems: Inspection Criteria, approach, and Lines of Inquiry (HSS CRAD 45-38, Rev. 1) The following provides an overview of the typical activities that will be performed to collect information to evaluate the effectiveness of the environmental management system. Several terms used throughout this document are defined (last three terms based on ISO 14001 :2004(E) Section 3, Terms and Definitions) as follows: The term "activities" encompasses various types of projects including construction, restoration, maintenance, operations, research and development (R&D), and other work activities that could expose the workers,

129

Robotics for waste storage inspection: A user`s perspective  

SciTech Connect (OSTI)

Self-navigating robotic vehicles are now commercially available, and the technology supporting other important system components has also matured. Higher reliability and the obtainability of system support now make it practical to consider robotics as a way of addressing the growing operational requirement for the periodic inspection and maintenance of radioactive, hazardous, and mixed waste inventories. This paper describes preparations for the first field deployment of an autonomous container inspection robot at a Department of Energy (DOE) site. The Stored Waste Autonomous Mobile Inspector (SWAMI) is presently being completed by engineers at the Savannah River Technology Center (SRTC). It is a modified version of a commercially available robot. It has been outfitted with sensor suites and cognition that allow it to perform inspections of drum inventories and their storage facilities.

Hazen, F.B.

1994-06-23T23:59:59.000Z

130

INTERNAL REPAIR OF PIPELINES  

SciTech Connect (OSTI)

The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is only marginally effective at restoring the pressure containing capabilities of pipelines. Failure pressures for larger diameter pipe repaired with a semi-circular patch of carbon fiber-reinforced composite lines were also marginally greater than that of a pipe section with un-repaired simulated damage without a liner. These results indicate that fiber reinforced composite liners have the potential to increase the burst pressure of pipe sections with external damage Carbon fiber based liners are viewed as more promising than glass fiber based liners because of the potential for more closely matching the mechanical properties of steel. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. In lieu of a field installation on an abandoned pipeline, a preliminary nondestructive testing protocol is being developed to determine the success or failure of the fiber-reinforced liner pipeline repairs. Optimization and validation activities for carbon-fiber repair methods are ongoing.

Bill Bruce; Nancy Porter; George Ritter; Matt Boring; Mark Lozev; Ian Harris; Bill Mohr; Dennis Harwig; Robin Gordon; Chris Neary; Mike Sullivan

2005-07-20T23:59:59.000Z

131

UCSC EMPLOYEE HOUSING APARTMENTS APPLICATION Rental rates include: rent, refuse collection, common area utilities, groundskeeping services, and repairs and  

E-Print Network [OSTI]

area utilities, groundskeeping services, and repairs and maintenance of the Laureate Court complex. Tenants pay for their own utilities (i.e., electricity, gas, water, telephone and cable services). A $750

California at Santa Cruz, University of

132

Risk-based inspection in ASME Section XI  

SciTech Connect (OSTI)

By 1970 the first edition of the ASME Code Section XI, Inservice Inspection of Nuclear Reactor Coolant Systems was published. From its inception, the Section XI inservice inspection scope was based on a fundamental risk-based selection process. In other words the inservice inspection scope included components where the consequences of a pressure boundary failure were high. Once the consequence significant system boundaries were established, inspections would then be performed at locations believed to be most susceptible service induced failure. Current Section XI requirements require that inspection locations be selected on the basis of peak stress and fatigue usage values contained in the Design Reports. These original stress calculations were designed to qualify a design and assure that the plant would provide reliable service throughout its design life. For the most part, the fatigue usage values in these reports do not provide an accurate measure of service life. As service history has demonstrated, the use of Design Report stresses and fatigue usage values can be misleading. The Section XI ISI inspection requirements have always been intended to focus inspections at those locations in the plant that pose the greater risk to reactor safety. This fundamental principle behind the Section XI inspection requirements has guided Section XI since its inception. However, today Utility resources are limited. The move in many states to deregulate utilities and growing competition from independent power producers is challenging Owners to reduce operating and maintenance cost without sacrificing safety. These programs should allow plants to focus limited resources on those locations where damage mechanisms are active and consequences are high. This will provide for efficient use of plants resources and improve safety.

Lance, J.J.

1996-12-01T23:59:59.000Z

133

Instructions for Facility Inspection Report 1. Complete Facility Inspection Report for each inspection;  

E-Print Network [OSTI]

on the site diagram) Date of Inspection/ Inspected By Spill Response Kit Materials in Adequate Supply, drum storage areas, fueling areas, and other locations where oil is handled/loaded/unloaded. These are shown on the site diagrams in Appendix A. #12;MONTHLY TANK INSPECTION REPORT Instructions: 1. Complete

134

INTERNAL REPAIR OF PIPELINES  

SciTech Connect (OSTI)

The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is only marginally effective at restoring the pressure containing capabilities of pipelines. Failure pressures for larger diameter pipe repaired with a semi-circular patch of carbon fiber-reinforced composite lines were also marginally greater than that of a pipe section with un-repaired simulated damage without a liner. These results indicate that fiber reinforced composite liners have the potential to increase the burst pressure of pipe sections with external damage Carbon fiber based liners are viewed as more promising than glass fiber based liners because of the potential for more closely matching the mechanical properties of steel. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. The first round of optimization and validation activities for carbon-fiber repairs are complete. Development of a comprehensive test plan for this process is recommended for use in the field trial portion of this program.

Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; George Ritter; Bill Mohr; Matt Boring; Nancy Porter; Mike Sullivan; Chris Neary

2004-12-31T23:59:59.000Z

135

EVALUATION OF SPRING OPERATED RELIEF VALVE MAINTENANCE INTERVALS AND EXTENSION OF MAINTENANCE TIMES USING A WEIBULL ANALYSIS WITH MODIFIED BAYESIAN UPDATING  

SciTech Connect (OSTI)

The Savannah River Site (SRS) spring operated pressure relief valve (SORV) maintenance intervals were evaluated using an approach provided by the American Petroleum Institute (API RP 581) for risk-based inspection technology (RBI). In addition, the impact of extending the inspection schedule was evaluated using Monte Carlo Simulation (MCS). The API RP 581 approach is characterized as a Weibull analysis with modified Bayesian updating provided by SRS SORV proof testing experience. Initial Weibull parameter estimates were updated as per SRS's historical proof test records contained in the Center for Chemical Process Safety (CCPS) Process Equipment Reliability Database (PERD). The API RP 581 methodology was used to estimate the SORV's probability of failing on demand (PFD), and the annual expected risk. The API RP 581 methodology indicates that the current SRS maintenance plan is conservative. Cost savings may be attained in certain mild service applications that present low PFD and overall risk. Current practices are reviewed and recommendations are made for extending inspection intervals. The paper gives an illustration of the inspection costs versus the associated risks by using API RP 581 Risk Based Inspection (RBI) Technology. A cost effective maintenance frequency balancing both financial risk and inspection cost is demonstrated.

Harris, S.; Gross, R.; Mitchell, E.

2011-01-18T23:59:59.000Z

136

Post-Deactivation Surveillance and Maintenance Planning | Department of  

Broader source: Energy.gov (indexed) [DOE]

Post-Deactivation Surveillance and Maintenance Planning Post-Deactivation Surveillance and Maintenance Planning Post-Deactivation Surveillance and Maintenance Planning One of the key elements of end-point planning is knowing what the post-deactivation S&M activities will be so that conditions can be established to support them. The post-deactivation S&M plan specifies the surveillance, inspection, and maintenance of the facility in the deactivated state. It should address the activities, the locations in which they will be conducted, and their frequency. Part of the S&M planning is deciding which spaces must be accessed and which equipment must be operated. This should be agreed upon with the organization that will receive the facility for subsequent S&M and, where needed to meet a stakeholder, regulatory, and tribal nations commitment.

137

Chapter 18 - Pipeline Vibration and Condition Based Maintenance  

Science Journals Connector (OSTI)

This chapter comprises two integrated parts. The first part of the chapter devotes to a detailed discussion of the mechanism leading to pipeline vibration and the effect of internal and external fluid flow on the pipeline vibration. It summarizes the formulations used for the design of optimal free span length of pipeline segments under different boundary conditions and pipeline operating conditions. Different measures used to mitigate pipeline vibration are also briefly discussed in the section. The procedures of pipeline condition based maintenance (CBM) are discussed in the second part of the chapter using vibration and other corrective maintenance (CM) parameters as asset health indicators. The typical models including P–F curve model, proportional hazard model, and proportional covariate model used to determine the optimal threshold and inspection intervals in CBM are introduced and discussed. The chapter also discusses the optimization of long-term maintenance activities using reliability based preventive maintenance decision-making approach.

Boyun Guo; Shanhong Song; Ali Ghalambor; Tian Ran Lin

2014-01-01T23:59:59.000Z

138

Post-Deactivation Surveillance and Maintenance Planning | Department of  

Broader source: Energy.gov (indexed) [DOE]

Post-Deactivation Surveillance and Maintenance Planning Post-Deactivation Surveillance and Maintenance Planning Post-Deactivation Surveillance and Maintenance Planning One of the key elements of end-point planning is knowing what the post-deactivation S&M activities will be so that conditions can be established to support them. The post-deactivation S&M plan specifies the surveillance, inspection, and maintenance of the facility in the deactivated state. It should address the activities, the locations in which they will be conducted, and their frequency. Part of the S&M planning is deciding which spaces must be accessed and which equipment must be operated. This should be agreed upon with the organization that will receive the facility for subsequent S&M and, where needed to meet a stakeholder, regulatory, and tribal nations commitment.

139

Inspection Report: IG-0821  

Broader source: Energy.gov (indexed) [DOE]

Fire Suppression and Related Services Fire Suppression and Related Services at Los Alamos National Laboratory DOE/IG-0821 September 2009 U.S. Department of Energy Office of Inspector General Office of Inspections Department of Energy Washington, DC 20585 September 11, 2009 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Inspection Report on "Fire Suppression and Related Services at Los Alamos National Laboratory" BACKGROUND The Department of Energy's (DOE's) Los Alamos National Laboratory (LANL) is a multidisciplinary research institution engaged in strategic science on behalf of national security. LANL operates in "unique" hazard environments, to include special nuclear materials, explosives, and hazardous chemicals, that create special fire suppression and

140

NSLS Electrical Equipment Inspection  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Electrical Equipment Inspection Information Electrical Equipment Inspection Information A note to vendors visiting NSLS A note to users visiting NSLS Proteus Electrical Conformity Remediation Currently Certified Electrical Equipment Inspectors: First Line Contacts Email Extension Poshka, Dennis poshka@bnl.gov 2825 Alternate Contacts Boerner Jr, Albert aboerner@bnl.gov 5990 Buda, Scott buda@bnl.gov 3914 Caruso, Michael caruso@bnl.gov 4100 Chmiel, Robert chmiel@bnl.gov 8141 Church, Randolph church@bnl.gov 2736 Clay, Barret clay@bnl.gov 7284 D'Alsace, Roy dalsace@bnl.gov 3973 Danneil, Christopher cdanneil@bnl.gov 8609 Davila, Peter davila@bnl.gov 7625 De Toll, Peter detoll@bnl.gov 4100 Durfee, Douglas ddurfee@bnl.gov 7625 Fulkerson, Michael fulkerso@bnl.gov 5194 Gallagher, John jgallagher@bnl.gov 5770 Harder, David dharder@bnl.gov 4978

Note: This page contains sample records for the topic "inspection maintenance repairs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Inspection tester for explosives  

DOE Patents [OSTI]

An inspection tester that can be used anywhere as a primary screening tool by non-technical personnel to determine whether a surface contains explosives. It includes a body with a sample pad. First and second explosives detecting reagent holders and dispensers are operatively connected to the body and the sample pad. The first and second explosives detecting reagent holders and dispensers are positioned to deliver the explosives detecting reagents to the sample pad. A is heater operatively connected to the sample pad.

Haas, Jeffrey S. (San Ramon, CA); Simpson, Randall L. (Livermore, CA); Satcher, Joe H. (Patterson, CA)

2007-11-13T23:59:59.000Z

142

Inspection tester for explosives  

DOE Patents [OSTI]

An inspection tester that can be used anywhere as a primary screening tool by non-technical personnel to determine whether a surface contains explosives. It includes a body with a sample pad. First and second explosives detecting reagent holders and dispensers are operatively connected to the body and the sample pad. The first and second explosives detecting reagent holders and dispensers are positioned to deliver the explosives detecting reagents to the sample pad. A is heater operatively connected to the sample pad.

Haas, Jeffrey S. (San Ramon, CA); Simpson, Randall L. (Livermore, CA); Satcher, Joe H. (Patterson, CA)

2010-10-05T23:59:59.000Z

143

Waste Inspection Tomography (WIT)  

SciTech Connect (OSTI)

Waste Inspection Tomography (WIT) provides mobile semi-trailer mounted nondestructive examination (NDE) and assay (NDA) for nuclear waste drum characterization. WIT uses various computed tomography (CT) methods for both NDE and NDA of nuclear waste drums. Low level waste (LLW), transuranic (TRU), and mixed radioactive waste can be inspected and characterized without opening the drums. With externally transmitted x-ray NDE techniques, WIT has the ability to identify high density waste materials like heavy metals, define drum contents in two- and three-dimensional space, quantify free liquid volumes through density and x-ray attenuation coefficient discrimination, and measure drum wall thickness. With waste emitting gamma-ray NDA techniques, WIT can locate gamma emitting radioactive sources in two- and three-dimensional space, identify gamma emitting isotopic species, identify the external activity levels of emitting gamma-ray sources, correct for waste matrix attenuation, provide internal activity approximations, and provide the data needed for waste classification as LLW or TRU. The mobile feature of WIT allows inspection technologies to be brought to the nuclear waste drum storage site without the need to relocate drums for safe, rapid, and cost-effective characterization of regulated nuclear waste. The combination of these WIT characterization modalities provides the inspector with an unprecedented ability to non-invasively characterize the regulated contents of waste drums as large as 110 gallons, weighing up to 1,600 pounds. Any objects that fit within these size and weight restrictions can also be inspected on WIT, such as smaller waste bags and drums that are five and thirty-five gallons.

Bernardi, R.T.

1995-12-01T23:59:59.000Z

144

Infrared microscope inspection apparatus  

DOE Patents [OSTI]

Apparatus and system for inspecting infrared transparents, such as an array of photovoltaic modules containing silicon solar cells, includes an infrared microscope, at least three sources of infrared light placed around and having their axes intersect the center of the object field and means for sending the reflected light through the microscope. The apparatus is adapted to be mounted on an X-Y translator positioned adjacent the object surface. 4 figs.

Forman, S.E.; Caunt, J.W.

1985-02-26T23:59:59.000Z

145

Infrared microscope inspection apparatus  

DOE Patents [OSTI]

Apparatus and system for inspecting infrared transparents, such as an array of photovoltaic modules containing silicon solar cells, includes an infrared microscope, at least three sources of infrared light placed around and having their axes intersect the center of the object field and means for sending the reflected light through the microscope. The apparatus is adapted to be mounted on an X-Y translator positioned adjacent the object surface.

Forman, Steven E. (Framingham, MA); Caunt, James W. (Concord, MA)

1985-02-26T23:59:59.000Z

146

INTERNAL REPAIR OF PIPELINES  

SciTech Connect (OSTI)

The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is only marginally effective at restoring the pressure containing capabilities of pipelines. Failure pressures for larger diameter pipe repaired with a semi-circular patch of carbon fiber-reinforced composite lines were also marginally greater than that of a pipe section with un-repaired simulated damage without a liner. These results indicate that fiber reinforced composite liners have the potential to increase the burst pressure of pipe sections with external damage Carbon fiber based liners are viewed as more promising than glass fiber based liners because of the potential for more closely matching the mechanical properties of steel. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. Development of a comprehensive test plan for this process is recommended for use in the field trial portion of this program.

Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; George Ritter; Bill Mohr; Matt Boring; Nancy Porter; Mike Sullivan; Chris Neary

2004-08-17T23:59:59.000Z

147

Rapid road repair vehicle  

DOE Patents [OSTI]

Disclosed are improvments to a rapid road repair vehicle comprising an improved cleaning device arrangement, two dispensing arrays for filling defects more rapidly and efficiently, an array of pre-heaters to heat the road way surface in order to help the repair material better bond to the repaired surface, a means for detecting, measuring, and computing the number, location and volume of each of the detected surface imperfection, and a computer means schema for controlling the operation of the plurality of vehicle subsystems. The improved vehicle is, therefore, better able to perform its intended function of filling surface imperfections while moving over those surfaces at near normal traffic speeds.

Mara, Leo M. (Livermore, CA)

1999-01-01T23:59:59.000Z

148

Modelling repairable system reliability with explanatory variables and repair and maintenance actions  

Science Journals Connector (OSTI)

......time (such as operating hours, fuel consumption, etc) does not already represent...a case study applied to diesel engine control. Microelectron. Reliab...Proportional hazards analysis of diesel engine failure data. Qual. Reliab......

Diederik Lugtigheid; agan Banjevic; Andrew K. S. Jardine

2004-04-01T23:59:59.000Z

149

Modelling repairable system reliability with explanatory variables and repair and maintenance actions  

Science Journals Connector (OSTI)

......time (such as operating hours, fuel consumption, etc) does not already represent...electronics: a case study applied to diesel engine control. Microelectron. Reliab...Proportional hazards analysis of diesel engine failure data. Qual. Reliab......

Diederik Lugtigheid; agan Banjevic; Andrew K. S. Jardine

2004-04-01T23:59:59.000Z

150

Modelling repairable system reliability with explanatory variables and repair and maintenance actions  

Science Journals Connector (OSTI)

......hazards modeling in reliability analysis-an application to...model to light water reactor component failure data...SGATTI,S.(2003) Reliability in automotive electronics...1972a) The statistical analysis of dependencies in point......

Diederik Lugtigheid; agan Banjevic; Andrew K. S. Jardine

2004-04-01T23:59:59.000Z

151

Modelling repairable system reliability with explanatory variables and repair and maintenance actions  

Science Journals Connector (OSTI)

......schedule for a 1000 h cycle. The RM schedule for a 1000 h cycle includes all activities for the 250 h cycle (as it is a multiple...occasions. However, in general, in RMs only consumable...frequently used with diesel engines). Both the......

Diederik Lugtigheid; agan Banjevic; Andrew K. S. Jardine

2004-04-01T23:59:59.000Z

152

The use of probabilistic risk assessment to satisfy the Nuclear Regulatory Commission`s maintenance rule  

SciTech Connect (OSTI)

Maintenance and inspection at nuclear power plants consumes a large portion of a utility`s resources, making resource allocation for such procedures vital. The NRC Maintenance Rule, due to be implemented in July of 1996, requires utilities to select systems, structures, and components (SSCS) important to safety and to develop a monitoring program to ensure that these SSCs are capable of fulfilling their intended functions. In light of these concerns, two ratios were developed to compare the risk significance of individual components with the amount of plant staff time, or burden, associated with inspecting the component. These risk/burden ratios point out existing disparities between current inspection practices and safety concerns. These ratios can be used to develop new inspection schedules constituting a more equitable risk to burden distribution.

Dubord, R.M. [Massachusetts Inst. of Tech., Cambridge, MA (United States). Dept. of Nuclear Engineering

1993-05-01T23:59:59.000Z

153

INTERNAL REPAIR OF PIPELINES  

SciTech Connect (OSTI)

The two broad categories of deposited weld metal repair and fiber-reinforced composite liner repair technologies were reviewed for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Preliminary test programs were developed for both deposited weld metal repair and for fiber-reinforced composite liner repair. Evaluation trials have been conducted using a modified fiber-reinforced composite liner provided by RolaTube and pipe sections without liners. All pipe section specimens failed in areas of simulated damage. Pipe sections containing fiber-reinforced composite liners failed at pressures marginally greater than the pipe sections without liners. The next step is to evaluate a liner material with a modulus of elasticity approximately 95% of the modulus of elasticity for steel. Preliminary welding parameters were developed for deposited weld metal repair in preparation of the receipt of Pacific Gas & Electric's internal pipeline welding repair system (that was designed specifically for 559 mm (22 in.) diameter pipe) and the receipt of 559 mm (22 in.) pipe sections from Panhandle Eastern. The next steps are to transfer welding parameters to the PG&E system and to pressure test repaired pipe sections to failure. A survey of pipeline operators was conducted to better understand the needs and performance requirements of the natural gas transmission industry regarding internal repair. Completed surveys contained the following principal conclusions: (1) Use of internal weld repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling (HDD) when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) Pipe diameter sizes range from 50.8 mm (2 in.) through 1,219.2 mm (48 in.). The most common size range for 80% to 90% of operators surveyed is 508 mm to 762 mm (20 in. to 30 in.), with 95% using 558.8 mm (22 in.) pipe. An evaluation of potential repair methods clearly indicates that the project should continue to focus on the development of a repair process involving the use of GMAW welding and on the development of a repair process involving the use of fiber-reinforced composite liners.

Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; Nancy Porter; Mike Sullivan; Chris Neary

2004-04-12T23:59:59.000Z

154

Summary report for 1990 inservice inspection (ISI) of SRS 100-L reactor tank  

SciTech Connect (OSTI)

The integrity of the SRS reactor tanks is a key factor affecting their suitability for continued service since, unlike the external piping system and components, the tanks are virtually irreplaceable. Cracking in various areas of the process water piping systems has occurred beginning in about 1960 as a result of several degradation mechanisms, chiefly intergranular stress corrosion cracking (IGSCC) and chloride-induced transgranular cracking. The primary objective of this inspection was to determine if the accessible welds and selected portions of base metal in the L Reactor tank wall contain any indications of IGSCC. This inspection included areas in and beyond the weld HAZ, extending out as far as two to three inches from the centerline of the welds, plus selected areas of base metal at the intersection of the main tank vertical and mid-girth welds. No evidence of such degradation was found in any of the areas examined. Further, additional inspections were conducted of areas that had been damaged and repaired during original fabrication, and on a sample of areas containing linear indications observed during the 1986 visual inspection of the tank. No evidence of IGSCC or other service induced degradation was detected in these areas, either. The inspection was initially planned to cover a minimum of 60% of the accessible welds, plus repair areas and a sample of the indications from the 1986 visual inspection. Direction was received from DOE while the inspection was in progress to expand the scope to cover 100% of the accessible weld areas, and the plan was adjusted accordingly. Initial setup of the tank, which prior to inspection contained Mark 60B target assemblies and nearly a full charge of Mark 22 fuel assemblies, began on October 15, 1990. The inspection was completed on April 12, 1991.

Morrison, J.M.; Loibl, M.W.

1991-07-12T23:59:59.000Z

155

Inspection Report: IG-0742 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2 2 Inspection Report: IG-0742 October 11, 2006 Protective Force Property Management at Lawrence Livermore National Laboratory The Department of Energy's (DOE's) Lawrence Livermore AND OBJECTIVE National Laboratory (LLNL) supports the maintenance of a safe, secure, and reliable nuclear weapon stockpile and provides expertise toward the prevention of the proliferation of weapons of mass destruction and terrorist attacks. LLNL is a National Nuclear Security Administration (NNSA) site operated by the University of California. In support of its core mission, Livermore maintains a protective force that is trained and equipped to secure its facilities and operations. For the past five years, the Laboratory's protective force has maintained a supply room that provides equipment required for Security Police Officers (SPOs) to carry

156

Operations and Maintenance Program Structure  

Broader source: Energy.gov [DOE]

The Federal Energy Management Program recommends Federal operations and maintenance (O&M) programs comprise of five distinct functions: operations, maintenance, engineering, training, and...

157

Seasonal Landscape Maintenance  

E-Print Network [OSTI]

Seasonal Landscape Maintenance Oklahoma State University, in compliance with Title VI and VII State University's Department of Horticulture and Landscape Architecture and Oklahoma Cooperative to dry between watering allows plants to develop stronger, deeper roots. However, some landscape plants

Balasundaram, Balabhaskar "Baski"

158

Associate Vice Chancellor Maintenance  

E-Print Network [OSTI]

Engineering Capital Planning & Design Carpentry Shop Electrical Shop Plumbing Shop HVAC Shop Housing Shop Equipment & Vehicle Maintenance Warehouse Vehicle Pool Shuttle Post Office Parking Services Contract Management Water Distribution Heat & Power Generation Heat Distribution Power Distribution December 2012

Hartman, Chris

159

Operations and Maintenance  

Broader source: Energy.gov [DOE]

Lower operations and maintenance (O&M) costs are critical to reducing a solar system's lifecycle cost of ownership. O&M costs are influenced by up-front investments in design, engineering,...

160

Safeguards management inspection procedures  

SciTech Connect (OSTI)

The objective of this inspection module is to independently assess the contributions of licensee management to overall safeguards systems performance. The inspector accomplishes this objective by comparing the licensee's safeguards management to both the 10 CFR, parts 70 and 73, requirements and to generally accepted management practices. The vehicle by which this comparison is to be made consists of assessment questions and key issues which point the inspector to areas of primary concern to the NRC and which raise additional issues for the purpose of exposing management ineffectiveness. Further insight into management effectiveness is obtained through those assessment questions specifically directed toward the licensee's safeguards system performance. If the quality of the safeguards is poor, then the inspector should strongly suspect that management's role is ineffective and should attempt to determine management's influence (or lack thereof) on the underlying safeguards deficiencies. (The converse is not necessarily true, however.) The assessment questions in essence provide an opportunity for the inspector to identify, to single out, and to probe further, questionable management practices. Specific issues, circumstances, and concerns which point to questionable or inappropriate practices should be explicitly identified and referenced against the CFR and the assessment questions. The inspection report should also explain why the inspector feels certain management practices are poor, counter to the CFR, and/or point to ineffecive management. Concurrent with documenting the inspection results, the inspector should provide recommendations for alleviating observed management practices that are detrimental to effective safeguards. The recommendations could include: specific changes in the practices of the licensee, followup procedures on the part of NRC, and proposed license changes.

Barth, M.J.; Dunn, D.R.

1984-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "inspection maintenance repairs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Condition Assessment Survey (CAS) Program. Deficiency standards and inspections methods manual: Volume 6, 0.06 Interior construction  

SciTech Connect (OSTI)

General information is presented for asset determinant factor/CAS repair codes/CAS cost factors; guide sheet tool & material listing; testing methods; inspection frequency; standard system design life tables; system work breakdown structure; and general system/material data. Deficiency standards and inspection methods are presented for conventional and specialty partitions, toilet partitions & accessories, interior doors, paint finishes/coatings/ wall covering systems; floor finishing systems; and ceiling systems.

Not Available

1993-05-01T23:59:59.000Z

162

Condition Assessment Survey (CAS) Program. Deficiency standards and inspections methods manual: Volume 12, 0.12 Sitework  

SciTech Connect (OSTI)

General information is presented for asset determinant factor/CAS repair codes/CAS cost factors; guide sheet tool & material listing; testing methods; inspection frequency; standard system design life tables; system work breakdown structure; and general system/material data. Deficiency standards and inspection methods are given for utility distribution systems, central heating, central cooling, electrical, utility support structures, paving roadways/walkways, and tunnels.

Not Available

1993-05-01T23:59:59.000Z

163

Condition Assessment Survey (CAS) Program. Deficiency standards and inspections methods manual: Volume 5, 0.05 Roofing  

SciTech Connect (OSTI)

General information is presented for asset determinant factor/CAS repair codes/CAS cost factors; guide sheet tool & material listing; testing methods; inspection frequency; standard system design life tables; and system work breakdown structure. Deficiency standards and inspection methods are presented for built-up membrane; single- ply membrane; metal roofing systems; coated foam membrane; shingles; tiles; parapets; roof drainage system; roof specialties; and skylights.

Not Available

1993-05-01T23:59:59.000Z

164

Condition Assessment Survey (CAS) Program. Deficiency standards and inspections methods manual: Volume 11, 0.11 Specialty systems  

SciTech Connect (OSTI)

General information is presented for asset determinant factor/CAS repair codes/CAS cost factors; guide sheet tool & material listing; testing methods; inspection frequency; standard system design life tables; system work breakdown structure; and general system/material data. Deficiency standards and inspection methods are presented for canopies; loading dock systems; tanks; domes (bulk storage, metal framing); louvers & vents; access floors; integrated ceilings; and mezzanine structures.

Not Available

1993-05-01T23:59:59.000Z

165

LASER SAFETY SELF-INSPECTION CHECKLIST Lab Supervisor _________________________ Inspected By: __________________________  

E-Print Network [OSTI]

LASER SAFETY SELF-INSPECTION CHECKLIST Lab Supervisor _________________________ Inspected By, and alignment procedures kept with laser equipment? yes no 3. Have all commercially produced Class 3b and 4 lasers and all lasers made or modified on campus been registered with the University's Laser Safety

Bolch, Tobias

166

Waste inspection tomography (WIT)  

SciTech Connect (OSTI)

The WIT program will provide an inspection system that offers the nuclear waste evaluator a unique combination of tools for regulatory-driven characterization of low-level waste (LLW), transuranic waste (TRU), and mixed waste drums. WIT provides nondestructive, noninvasive, and environmentally safe inspections using X-ray and gamma ray technologies, with reasonable cost and throughput. Two emission imaging techniques will be employed for characterizing materials in waste containers. The first of these is gamma emission tomography, commonly called single-photon emission computed tomography (SPECT). Rather than using an external radiation source, SPECT uses the emission of radioactive materials within the object of interest for imaging. In this case, emission from actual nuclear waste within a container will provide a three-dimensional image of the radioactive substances in the container. The second emission technique will use high-purity germanium detectors for gamma ray spectroscopy. This technique, called nondestructive assay (NDA), can identify the emitting isotopic species and strength. Work in emission tomography and assay of nuclear waste has been undertaken at Lawrence Livermore National Laboratory using a technique called Passive Tomography. Results from a process development unit are presented.

Bernardi, R.T.; Han, K.S.

1994-12-31T23:59:59.000Z

167

Kalispell Maintenance Headquarters Project : Environmental Assessment.  

SciTech Connect (OSTI)

The facilities needed to maintain and repair Bonneville Power Administration (BPA's) electrical equipment in northwest Montana are currently in two locations: A maintenance headquarters at the Kalispell Substation, and a temporary leased facility south of Kalispell. The present situation is not efficient. There is not enough space to accommodate the equipment needed at each site, and coordination and communication between the two sites is difficult. Also, two sites means duplication of equipment and facilities. BPA needs a single, centralized facility that would efficiently accommodate all the area's maintenance activities and equipment. BPA proposes to build a maintenance headquarters facility consisting of 2 to 4 single-story buildings totaling about 35,000 square feet (office spaces and workshop areas); an open-ended vehicle storage building (carport style); a fenced-in storage year; a storage building for flammables, herbicides, and hazardous wastes; and a parking lot. The facility would require developing about 6 to 10 acres of land. Two sites are being considered for the proposed project (see the attached map for locations). This report is the environmental assessment of the two options.

United States. Bonneville Power Administration.

1991-01-01T23:59:59.000Z

168

Lessons Learned from Annual Inspection Process - 12329  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Office of Legacy Management's (LM) mission is to manage DOE's post-closure responsibilities and ensure the future protection of human health and the environment. LM has control and custody of legacy land, structures, and facilities and is responsible for maintaining them at levels suitable for their long-term use. As defined by the DOE guidance document Long-Term Stewardship Planning Guidance for Closure Sites, long-term stewardship refers to all activities necessary to ensure protection of human health and the environment. These activities include, but are not limited to, 'all engineered and institutional controls (ICs) designed to contain or to prevent exposure to residual contamination and waste, such as surveillance activities, record-keeping activities, inspections, groundwater monitoring, maintenance of other barriers and contained structures, access control, and posting signs'. The development and management of ICs have been, and continue to be, critical to the success of LM surveillance and maintenance activities. (authors)

Kothari, Vijendra [Weldon Spring Site Manager, DOE Office of Legacy Management, Morgantown, West Virginia (United States); Uhlmeyer, Terri; Thompson, Randy [SM Stoller Corporation, St. Charles, Missouri (United States)

2012-07-01T23:59:59.000Z

169

Microsoft Word - CX-RiceFlatsSiteMaintenanceFY12_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

12, 2012 12, 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Steve Lowder Project Manager - TESM-AMPN-2 Proposed Action: Rice Flats Electrode Site Maintenance and Inspection Project Budget Information: Work Order #00219387 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities Location: The proposed project area is approximately seven miles southeast of The Dalles,

170

Laser Safety Inspection Criteria  

SciTech Connect (OSTI)

A responsibility of the Laser Safety Officer (LSO) is to perform laser safety audits. The American National Standard Z136.1 Safe use of Lasers references this requirement in several sections: (1) Section 1.3.2 LSO Specific Responsibilities states under Hazard Evaluation, ''The LSO shall be responsible for hazards evaluation of laser work areas''; (2) Section 1.3.2.8, Safety Features Audits, ''The LSO shall ensure that the safety features of the laser installation facilities and laser equipment are audited periodically to assure proper operation''; and (3) Appendix D, under Survey and Inspections, it states, ''the LSO will survey by inspection, as considered necessary, all areas where laser equipment is used''. Therefore, for facilities using Class 3B and or Class 4 lasers, audits for laser safety compliance are expected to be conducted. The composition, frequency and rigueur of that inspection/audit rests in the hands of the LSO. A common practice for institutions is to develop laser audit checklists or survey forms. In many institutions, a sole Laser Safety Officer (LSO) or a number of Deputy LSO's perform these audits. For that matter, there are institutions that request users to perform a self-assessment audit. Many items on the common audit list and the associated findings are subjective because they are based on the experience and interest of the LSO or auditor in particular items on the checklist. Beam block usage is an example; to one set of eyes a particular arrangement might be completely adequate, while to another the installation may be inadequate. In order to provide more consistency, the National Ignition Facility Directorate at Lawrence Livermore National Laboratory (NIF-LLNL) has established criteria for a number of items found on the typical laser safety audit form. These criteria are distributed to laser users, and they serve two broad purposes: first, it gives the user an expectation of what will be reviewed by an auditor, and second, it is an opportunity to explain audit items to the laser user and thus the reasons for some of these items. Some examples are given from the audit criteria handout. As an explanatory key to the reader, an Operational Safety Procedure (OSP) as a formally reviewed safety procedure required for all Class 3B and Class 4 laser installations. An ''OSP Binder'' contains all safety documentation related to a given laser operation and serves as a central repository for documents, such as the OSP, interlock logs, lessons learned, contact information etc. ''Unattended Operation'' refers to approved procedures for unattended operation of the laser installation and may include operation beyond normal working hours. ''L-train'' is the LLNL training tracking system.

Barat, K

2005-02-11T23:59:59.000Z

171

Inspection Report: IG-0378 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

8 Inspection Report: IG-0378 August 29, 1995 Report on Follow-up Inspection of the Double Funding of Security for Special Nuclear Material at Richland Operations Inspection Report:...

172

Device for inspecting vessel surfaces  

DOE Patents [OSTI]

A portable, remotely-controlled inspection crawler for use along the walls of tanks, vessels, piping and the like. The crawler can be configured to use a vacuum chamber for supporting itself on the inspected surface by suction or a plurality of magnetic wheels for moving the crawler along the inspected surface. The crawler is adapted to be equipped with an ultrasonic probe for mapping the structural integrity or other characteristics of the surface being inspected. Navigation of the crawler is achieved by triangulation techniques between a signal transmitter on the crawler and a pair of microphones attached to a fixed, remote location, such as the crawler's deployment unit. The necessary communications are established between the crawler and computers external to the inspection environment for position control and storage and/or monitoring of data acquisition.

Appel, D. Keith (Aiken, SC)

1995-01-01T23:59:59.000Z

173

Ultrasonic inspection and deployment apparatus  

DOE Patents [OSTI]

An ultrasonic inspection apparatus for the inspection of metal structures, especially installed pipes. The apparatus combines a specimen inspection element, an acoustical velocity sensing element, and a surface profiling element, all in one scanning head. A scanning head bellows contains a volume of oil above the pipe surface, serving as acoustical couplant between the scanning head and the pipe. The scanning head is mounted on a scanning truck which is mobile around a circular track surrounding the pipe. The scanning truck has sufficient motors, gears, and position encoders to allow the scanning head six degrees of motion freedom. A computer system continually monitors acoustical velocity, and uses that parameter to process surface profiling and inspection data. The profiling data is used to automatically control scanning head position and alignment and to define a coordinate system used to identify and interpret inspection data. The apparatus is suitable for highly automated, remote application in hostile environments, particularly high temperature and radiation areas.

Michaels, Jennifer E. (Ithaca, NY); Michaels, Thomas E. (Ithaca, NY); Mech, Jr., Stephen J. (Pasco, WA)

1984-01-01T23:59:59.000Z

174

Inspection Report: IG-0693 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

3 Inspection Report: IG-0693 June 17, 2005 Review of Security at the Strategic Petroleum Reserve The Office of Inspector General initiated an inspection of security at the...

175

Inspection Report: INS-9502 | Department of Energy  

Energy Savers [EERE]

26, 1995 Report on Inspection of Analytical Laboratories Oversight at the Strategic Petroleum Reserve Inspection Report: INS-9502 More Documents & Publications Audit Report:...

176

Inspection Report: IG-0809 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

09 Inspection Report: IG-0809 January 2009 Pantex Laser Perimeter Awareness System This inspection report is not publicly releasable because it contains Unclassified Controlled...

177

Independent Oversight Inspection, Argonne National Laboratory...  

Broader source: Energy.gov (indexed) [DOE]

Argonne National Laboratory - East, Summary Report - May 2002 Independent Oversight Inspection, Argonne National Laboratory - East, Summary Report - May 2002 May 2002 Inspection of...

178

Independent Oversight Inspection, Argonne National Laboratory...  

Broader source: Energy.gov (indexed) [DOE]

Inspection, Argonne National Laboratory-West - November 2004 Independent Oversight Inspection, Argonne National Laboratory-West - November 2004 November 2004 Emergency Management...

179

Inspection Report: IG-0563 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

63 Inspection Report: IG-0563 July 1, 2002 Security of Spent Nuclear Fuel at the West Valley Demonstration Project (U) Inspection Report: IG-0563 More Documents & Publications...

180

Independent Oversight Inspection, Oak Ridge National Laboratory...  

Broader source: Energy.gov (indexed) [DOE]

5 Independent Oversight Inspection, Oak Ridge National Laboratory - October 2005 October 2005 Inspection of Emergency Management at the Oak Ridge Office and the Oak Ridge National...

Note: This page contains sample records for the topic "inspection maintenance repairs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Independent Oversight Inspection, Oak Ridge National Laboratory...  

Energy Savers [EERE]

Oak Ridge National Laboratory - October 2008 Independent Oversight Inspection, Oak Ridge National Laboratory - October 2008 October 2008 Inspection of Emergency Management at the...

182

Independent Oversight Inspection, Oak Ridge National Laboratory...  

Broader source: Energy.gov (indexed) [DOE]

Oak Ridge National Laboratory - October 2008 Independent Oversight Inspection, Oak Ridge National Laboratory - October 2008 October 2008 Inspection of Nuclear Safety at the Oak...

183

Inspection Report: IG-0604 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

04 Inspection Report: IG-0604 June 2, 2003 Inspection of Savannah River Operations Office Management of Emergency Response and Law Enforcement-Related Grants The Office of...

184

Independent Oversight Inspection, Waste Isolation Pilot Plant...  

Office of Environmental Management (EM)

Plant, Summary Report - August 2002 Independent Oversight Inspection, Waste Isolation Pilot Plant, Summary Report - August 2002 August 2002 Inspection of Environment, Safety, and...

185

Inspection Report: IG-0433 | Department of Energy  

Office of Environmental Management (EM)

433 Inspection Report: IG-0433 December 3, 1998 Inspection of Department of Energy's Conference Policies and Practices The Department of Energy (Department) is a recognized world...

186

Independent Oversight Inspection of Environment, Safety, and...  

Broader source: Energy.gov (indexed) [DOE]

Inspection of Environment, Safety, and Health Programs at the Argonne National Laboratory, Technical Appendices, Volume II, May 2005 Independent Oversight Inspection of...

187

Independent Oversight Inspection of Environment, Safety, and...  

Broader source: Energy.gov (indexed) [DOE]

Inspection of Environment, Safety, and Health Programs at the Savannah River Operations Office and Savannah River Site, January 2010 Independent Oversight Inspection of...

188

Request an Inspection of User Electrical Equipment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Request for an Electrical Equipment Inspection All APS User electronic and electrical equipment must be inspected before use in an experiment. Please ask your beamline to make...

189

Independent Oversight Inspection, Lawrence Livermore National...  

Broader source: Energy.gov (indexed) [DOE]

National Laboratory - July 2013 Independent Oversight Inspection, Lawrence Livermore National Laboratory - June 2005 Independent Oversight Inspection, Nevada Test Site - June 2007...

190

Inspection Report: IG-0745 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

control. Examples of these materials include plutonium, enriched uranium, americium, and depleted uranium. Inspection Report: IG-0745 More Documents & Publications Inspection...

191

Essential Systems Functionality Inspection Criteria, Approach...  

Broader source: Energy.gov (indexed) [DOE]

Essential Systems Functionality Inspection Criteria, Approach, and Lines of Inquiry, October 16, 2008 (HSS CRAD 64-11 Rev. 2) Essential Systems Functionality Inspection Criteria,...

192

Independent Oversight Inspection of Environment, Safety, and...  

Broader source: Energy.gov (indexed) [DOE]

Inspection of Environment, Safety, and Health Programs at the Pantex Plant, Technical Appendices, Volume II, February 2005 Independent Oversight Inspection of Environment, Safety,...

193

Independent Oversight Inspection, Sandia National Laboratories...  

Broader source: Energy.gov (indexed) [DOE]

Oversight Inspection, Sandia National Laboratories - May 2005 May 2005 Inspection of Environment, Safety, and Health Programs at the Sandia National Laboratories This report...

194

Independent Oversight Inspection, Pantex Plant, Summary Report...  

Broader source: Energy.gov (indexed) [DOE]

Inspection, Pantex Plant, Summary Report - November 2002 November 2002 Inspection of Environment, Safety, and Health and Emergency Management at the Pantex Plant This report...

195

Independent Oversight Inspection, Hanford Site - September 2006...  

Broader source: Energy.gov (indexed) [DOE]

Oversight Inspection, Hanford Site - September 2006 September 2006 Inspection of Environment, Safety, and Health and Emergency Management Programs at the Hanford Site Waste...

196

Independent Oversight Inspection, Los Alamos National Laboratory...  

Broader source: Energy.gov (indexed) [DOE]

Oversight Inspection, Los Alamos National Laboratory - November 2005 Inspection of Environment, Safety, and Health Programs at the Los Alamos National Laboratory This report...

197

Independent Oversight Inspection of Environment, Safety, and...  

Broader source: Energy.gov (indexed) [DOE]

Inspection of Environment, Safety, and Health Programs at the Sandia National Laboratories, Technical Appendices, Volume II, May 2005 Independent Oversight Inspection of...

198

Independent Oversight Inspection, Pantex Plant, February 2005...  

Broader source: Energy.gov (indexed) [DOE]

Oversight Inspection, Pantex Plant, February 2005 February 2005 Inspection of Environment, Safety, and Health Programs at the Pantex Plant This report provides the results...

199

Independent Oversight Inspection, Idaho Cleanup Project - August...  

Broader source: Energy.gov (indexed) [DOE]

Oversight Inspection, Idaho Cleanup Project - August 2007 August 2007 Inspection of Environment, Safety, and Health Programs at the Idaho Cleanup Project This report provides the...

200

Independent Oversight Inspection, Idaho National Laboratory ...  

Broader source: Energy.gov (indexed) [DOE]

Inspection, Idaho National Laboratory - August 2007 August 2007 Inspection of Environment, Safety, and Health Programs at the Idaho National Laboratory's Materials and Fuels...

Note: This page contains sample records for the topic "inspection maintenance repairs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

F Reactor Inspection | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Inspection F Reactor Inspection Addthis Description Workers from Mission Support Alliance, LLC., removed the welds around the steel door of the F Reactor last week before...

202

Electric motor model repair specifications  

SciTech Connect (OSTI)

These model repair specifications list the minimum requirements for repair and overhaul of polyphase AC squireel cage induction motors. All power ranges, voltages, and speeds of squirrel cage motors are covered.

NONE

1995-08-01T23:59:59.000Z

203

Spring Home Maintenance: Windows, Windows, Windows! | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Spring Home Maintenance: Windows, Windows, Windows! Spring Home Maintenance: Windows, Windows, Windows! Spring Home Maintenance: Windows, Windows, Windows! April 26, 2013 - 11:42am Addthis Caulking is an easy way to reduce air leakage around your windows. | Photo courtesy of ©iStockphoto.com/BanksPhotos Caulking is an easy way to reduce air leakage around your windows. | Photo courtesy of ©iStockphoto.com/BanksPhotos Erin Connealy Communications Specialist, Office of Energy Efficiency and Renewable Energy How can I participate? Use these tips for window maintence and treatments to save energy this spring. The beginning of spring marks the point in the year when I'm cleaning, purging the house of things I no longer need, and updating my home on needed repairs. This year, I'm focusing on how to lower my energy bills

204

Dam Construction and Maintenance (Minnesota) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Construction and Maintenance (Minnesota) Construction and Maintenance (Minnesota) Dam Construction and Maintenance (Minnesota) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Water Buying & Making Electricity Program Info State Minnesota Program Type Siting and Permitting Dams may be constructed, improved, or repaired on private, non-navigable waters subject to certain timelines; however, previously-developed hydropower mechanisms cannot be disrupted. The State may also choose to

205

Spring Home Maintenance: Windows, Windows, Windows! | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Home Maintenance: Windows, Windows, Windows! Home Maintenance: Windows, Windows, Windows! Spring Home Maintenance: Windows, Windows, Windows! April 26, 2013 - 11:42am Addthis Caulking is an easy way to reduce air leakage around your windows. | Photo courtesy of ©iStockphoto.com/BanksPhotos Caulking is an easy way to reduce air leakage around your windows. | Photo courtesy of ©iStockphoto.com/BanksPhotos Erin Connealy Communications Specialist, Office of Energy Efficiency and Renewable Energy How can I participate? Use these tips for window maintence and treatments to save energy this spring. The beginning of spring marks the point in the year when I'm cleaning, purging the house of things I no longer need, and updating my home on needed repairs. This year, I'm focusing on how to lower my energy bills

206

Farm Out Maintenance Headaches  

Science Journals Connector (OSTI)

TIDEWATER OIL chalked up a number of firsts with its new Delaware refinery. The size and modern design of the plant drew a lot of attention and over-shadowed what may eventually be the most significant "first"—contract instrument maintenance.At the giant ...

1957-08-26T23:59:59.000Z

207

Operations and maintenance philosophy  

SciTech Connect (OSTI)

This Operations and Maintenance (O&M) Philosophy document is intended to establish a future O&M vision, with an increased focus on minimizing worker exposure, ensuring uninterrupted retrieval operations, and minimizing operation life-cycle cost. It is intended that this document would incorporate O&M lessons learned into on-going and future project upgrades.

DUNCAN, G.P.

1999-10-28T23:59:59.000Z

208

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2010  

SciTech Connect (OSTI)

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2010 and includes inspection and repair activities completed at the following seven CAUs: · CAU 400: Bomblet Pit and Five Points Landfill (TTR) · CAU 407: Roller Coaster RadSafe Area (TTR) · CAU 424: Area 3 Landfill Complexes (TTR) · CAU 426: Cactus Spring Waste Trenches (TTR) · CAU 453: Area 9 UXO Landfill (TTR) · CAU 484: Surface Debris, Waste Sites, and Burn Area (TTR) · CAU 487: Thunderwell Site (TTR)

NSTec Environmental Restoration

2011-03-30T23:59:59.000Z

209

OSDF Inspection Report  

Office of Legacy Management (LM)

29.1 12/12 29.1 12/12 On-Site Disposal Facility Inspection Report December 2012 6319D-6137 8929.2 12/12 East Face Cell 1 West Face Cell 1 6319D-6112 6319D-6135 8929.3 12/12 North Face Cell 1 North Drainage (looking west) 6319D-6110 6319D-6109 8929.4 12/12 East Face Cell 2 West Face Cell 2 6319D-6034 6319D-6113 8929.5 12/12 East Face Cell 3 West Face Cell 3 6319D-6133 6319D-6114 8929.6 12/12 East Face Cell 4 West Face Cell 4 6319D-6131 6319D-6116 8929.7 12/12 East Face Cell 5 West Face Cell 5 6319D-6130 6319D-6117 8929.8 12/12 East Face Cell 6 6319D-6118 6319D-6129 West Face Cell 6 8929.9 12/12 East Face Cell 7 6319D-6120 6319D-6127 West Face Cell 7 8929.10 12/12 East Face Cell 8 6319D-6121 6319D-6124 West Face Cell 8 8929.11 12/12

210

8744 - OSDF Inspection Report  

Office of Legacy Management (LM)

3.1 03/13 3.1 03/13 On-Site Disposal Facility Inspection Report March 2013 6319D-6168 8933.2 03/13 East Face Cell 1 West Face Cell 1 6319D-6149 6319D-6155 8933.3 03/13 North Face Cell 1 North Drainage (looking west) 6319D-6151 6319D-6152 8933.4 03/13 East Face Cell 2 West Face Cell 2 6319D-6056 6319D-6148 8933.5 03/13 East Face Cell 3 West Face Cell 3 6319D-6157 6319D-6147 8933.6 03/13 East Face Cell 4 West Face Cell 4 6319D-6158 6319D-6145 8933.7 03/13 East Face Cell 5 West Face Cell 5 6319D-6160 6319D-6144 8933.8 03/13 East Face Cell 6 6319D-6143 6319D-6161 West Face Cell 6 8933.9 03/13 East Face Cell 7 6319D-6141 6319D-6162 West Face Cell 7 8933.10 03/13 East Face Cell 8 6319D-6140 6319D-6164 West Face Cell 8 8933.11 03/13

211

Solar Permitting & Inspection Webinar Series  

Office of Energy Efficiency and Renewable Energy (EERE)

ICLEI Local Governments for Sustainability U.S.A. and the Interstate Renewable Energy Council, Inc. (IREC) present a series of three webinars on Solar Permitting & Inspection. As part of the U...

212

Cooling Tower Inspection with Scuba  

E-Print Network [OSTI]

A serious problem of scale and other solid material settling in heat transfer equipment was threatening to shut down our ethylene plant. All evidence pointed to the cooling tower as the source of the contamination. Visual inspection of the cooling...

Brenner, W.

1982-01-01T23:59:59.000Z

213

Proceedings: EPRI Second Phased Array Inspection Seminar  

SciTech Connect (OSTI)

The Second EPRI Phased Array Inspection Seminar focused on industrial applications of phased array technology that have been achieved to date or are planned for the near future. Presentations were made by developers of inspection techniques, inspection services vendors, and utility personnel who have performed inspections using arrays.

None

2001-11-01T23:59:59.000Z

214

Grantee Checklist for the Inspection & Monitoring Requirement  

Broader source: Energy.gov [DOE]

This document walks Grantees through the Inspection & Monitoring requirement of the Quality Work Plan.

215

Quality Work Plan Inspection and Monitoring Requirement  

Broader source: Energy.gov [DOE]

Inspection and monitoring requirements for Weatherization Assistance Program's comprehensive Quality Work Plan.

216

Your Global Inspection Solution 2 Glossary............................................................3  

E-Print Network [OSTI]

Your Global Inspection Solution 2 SEAFOOD INSPECTION PROGRAM Contents Glossary......................................................... 9 VI.Choose Seafood With Confidence Mark ...10 VII. Voluntary Retail Services Mark..............11 in the USDC seafood inspection program must be reviewed and approved by the Seafood Inspection Program. 2

217

Decision Support Tool for Prioritization of Resources Dedicated to Surveillance and Maintenance Activities  

Broader source: Energy.gov (indexed) [DOE]

Oak Ridge National Laboratory Florida International University Tennessee Florida Decision Support Tool for Prioritization of Resources Dedicated to Surveillance and Maintenance Activities Challenge The Department of Energy (DOE) currently faces a difficult task in the disposition of excess facilities. Many of these facilities are large and complex and contain potentially hazardous substances. Operational experience shows that once buildings have been declared excess and are transferred to surveillance and maintenance (S&M), maintenance budgets are reduced since the planned demolition of the building is used as a justification for not spending money to make repairs on it. One need identified at the Oak Ridge National Laboratory (ORNL), and

218

Audits & Inspections | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Audits & Inspections Audits & Inspections Audits & Inspections Audits & Inspections The Office of Audits and Inspections provides all internal and contracted audit activities, inspections, and reviews for Department programs and operations, including the National Nuclear Security Administration (NNSA) and the Federal Energy Regulatory Commission (FERC). The Office also performs all OIG intelligence oversight and reporting as required by Executive Order and statue. The Office works as an agent for positive change and continuous improvement in the Department's management and program operations; and strives to provide reliable, credible financial and performance information to senior Department management, the Congress and taxpayers. The Office of Audits and Inspections consists of a Headquarters

219

Allocation of inspection resources for international safeguards  

SciTech Connect (OSTI)

Increasing numbers and complexity of facilities inspected by the International Atomic Energy Agency will require difficult decisions about the levels of safeguards to be assigned to materials and facilities should limitations on inspection resources continue. This paper examines some alternative strategies for assigning inspection effort that could improve effectiveness and efficiency of safeguards compared with current inspection practice. These allocation concepts are: (1) extension of inspection planning to include material strata and accounting areas that encompass multiple facilities and (2) the use of randomization of the quality and frequency of inspections and inspection activities.

Markin, J.T.

1987-01-01T23:59:59.000Z

220

The Maintenance of Solar Energy  

Science Journals Connector (OSTI)

... this short essay is not satisfied with the current ideas as to the maintenance of solar ...solarenergy ...

1899-10-26T23:59:59.000Z

Note: This page contains sample records for the topic "inspection maintenance repairs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

HVAC Maintenance and Technologies  

Broader source: Energy.gov (indexed) [DOE]

HVAC - HVAC - Maintenance and Technologies Federal Utility Partnership Working Group Meeting Providence, Rhode Island April 15, 2010 BY Ramin Faramarzi, P.E. Technology Test Centers (TTC) Design and Engineering Services Southern California Edison (SCE) www.sce.com/rttc 2 Outline * Introduction to SCE's TTC * Overview of energy challenges in California (CA) * Role of HVAC in CA's energy and demand equations * Factors affecting HVAC performance * Focus on SCE's research on maintenance faults * Next generation of HVAC equipment * HVAC technologies on SCE's TTC radar * Black boxes - do they all work? 3 SCE's Technology Test Centers * SCE applied research facilities located in Irwindale, CA comprised of 3 test beds: * Refrigeration * HVAC * Lighting * Coming Soon! - A new ZNE lab 4 Refrigeration Testing

222

care and maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Care and Maintenance of the Prairie Parcel Care and Maintenance of the Prairie Parcel Now that your prairie parcel is up and growing, there are just a few concerns that you should consider about its care. Weeding The question of weeding is really just a matter of aesthetics. You do not have to weed your parcel. If your parcel is a large one, weeding may not even be practical. Although the "weed" species will dominate your parcel for the first few years, they will give way to the native plant species. You can liken the native plants to long distance runners; they appear to start off slowly, but end up winning the ecological race. After all, they are the plants that are genetically-suited and adapted to growing in this environment. The native prairie plants will be developing extensive root structure the

223

At CSUF, we stress the importance of bicycle safety and proper bicycle maintenance. Special incentives  

E-Print Network [OSTI]

At CSUF, we stress the importance of bicycle safety and proper bicycle maintenance. Special incentives and training classes are available for bicycle riders and vehicle drivers alike. Bicycle "Fix-it" Stations A well maintained bicycle is a safer bicycle. Campus bike repair stations offer free tools so

de Lijser, Peter

224

THE EFFECTS OF MAINTENANCE ACTIONS ON THE PFDavg OF SPRING OPERATED PRESSURE RELIEF VALVES  

SciTech Connect (OSTI)

The safety integrity level (SIL) of equipment used in safety instrumented functions is determined by the average probability of failure on demand (PFDavg) computed at the time of periodic inspection and maintenance, i.e., the time of proof testing. The computation of PFDavg is generally based solely on predictions or estimates of the assumed constant failure rate of the equipment. However, PFDavg is also affected by maintenance actions (or lack thereof) taken by the end user. This paper shows how maintenance actions can affect the PFDavg of spring operated pressure relief valves (SOPRV) and how these maintenance actions may be accounted for in the computation of the PFDavg metric. The method provides a means for quantifying the effects of changes in maintenance practices and shows how these changes impact plant safety.

Harris, S.; Gross, R.

2014-04-01T23:59:59.000Z

225

Federal Energy Management Program: Maintenance Types  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Maintenance Types Maintenance Types to someone by E-mail Share Federal Energy Management Program: Maintenance Types on Facebook Tweet about Federal Energy Management Program: Maintenance Types on Twitter Bookmark Federal Energy Management Program: Maintenance Types on Google Bookmark Federal Energy Management Program: Maintenance Types on Delicious Rank Federal Energy Management Program: Maintenance Types on Digg Find More places to share Federal Energy Management Program: Maintenance Types on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types Resources Contacts

226

Lawn Maintenance Safety  

E-Print Network [OSTI]

with lawn and garden tools, more than half involving riding lawn mowers and garden tractors. You can avoid accidents like these by making safety a regular part of lawn maintenance, particularly when using lawn mowers and other power tools. Lawn Mowers... mowers save homeowners valuable time and energy. These small tractors are much more powerful than walk-behind mowers and move two to three times as fast. To avoid accidents on riding mowers or larger tractors, it is important to use safe driving...

Smith, David

2005-07-12T23:59:59.000Z

227

TRUPACT-II Operating and Maintenance Instructions  

SciTech Connect (OSTI)

The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II) Shipping Package and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP) and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9218. In the event there is a conflict between this document and the TRUPACT-II SARP, the TRUPACT-II SARP shall govern. TRUPACT-II C of C number 9218 states, ''... each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' It further states, ''... each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the application.'' Chapter 9 of the TRUPACT-II SARP charges the Westinghouse Electric Corporation Waste Isolation Division (WID) with assuring that the TRUPACT-II is used in accordance with the requirements of the C of C. To meet this requirement and verify consistency of operations when loading and unloading the TRUPACT-II on the trailer, placing a payload in the packaging, unloading the payload from the packaging, or performing maintenance, the U.S. Department of Energy Carlsbad Area Office (U.S. DOE/CAO) finds it necessary to implement the changes that follow. This TRUPACT-II maintenance document represents a change to previous philosophy regarding site specific procedures for the use of the TRUPACT-II. This document details the instructions to be followed to consistently operate and maintain the TRUPACT-II. The intent of these instructions is to ensure that all users of the TRUPACT-II follow the same or equivalent instructions. Users may achieve this intent by any of the following methods: (1) Utilizing these instructions as is, or (2) Attaching a site-specific cover page/letter to this document stating that these are the instructions to be used at their location, or (3) Sites may prepare their own document using the steps in this document word-for-word, in-sequence, including Notes and Cautions. Site specific information may be included as deemed necessary. Submit the document to WID National TRU Programs for approval. Any revision made subsequent to WID TRU Program's approval shall be reviewed and approved by WID TRU Programs. A copy of the approval letter from WID National TRU Programs should be available for audit purposes. Users shall develop site-specific procedures addressing leak testing, preoperational activities, quality assurance, hoisting and rigging, and radiation health physics to be used in conjunction with the instructions contained in this document. Users desiring to recommend changes to this document may submit their recommendations to the WID National TRU Programs for evaluation. If approved, the change(s) will be incorporated into this document for use by all TRUPACT-II users. User sites will be audited to this document to ensure compliance within one year from the effective date of this revision. This document discusses operating instructions, required inspections and maintenance for the following: TRUPACT-II packaging, and Miscellaneous packaging, special tools, and equipment. Packaging and payload handling equipment and transport trailers have been specifically designed for use with the TRUPACT-II Packaging. This document discusses the required instructions for use of the following equipment in conjunction with the TRUPACT-II Packaging: TRUPACT-II Mobile Loading Unit (MLU), Adjustable Center-of-Gravity Lift Fixture (ACGLF), and TRUPACT-II Transport Trailer. Attachment E contains the various TRUPACT-II packaging interface control drawings, leak-test and vent-port tool drawings, ACGLF drawings, and tie-down drawings that identify the various system components.

Westinghouse Electric Corporation, Waste Isolation Division

1999-12-31T23:59:59.000Z

228

Final Report Inspection of Aged/Degraded Containments Program.  

SciTech Connect (OSTI)

The Inspection of Aged/Degraded Containments Program had primary objectives of (1) understanding the significant factors relating corrosion occurrence, efficacy of inspection, and structural capacity reduction of steel containments and liners of reinforced concrete containments; (2) providing the United States Nuclear Regulatory Commission (USNRC) reviewers a means of establishing current structural capacity margins or estimating future residual structural capacity margins for steel containments, and concrete containments as limited by liner integrity; (3) providing recommendations, as appropriate, on information to be requested of licensees for guidance that could be utilized by USNRC reviewers in assessing the seriousness of reported incidences of containment degradation; and (4) providing technical assistance to the USNRC (as requested) related to concrete technology. Primary program accomplishments have included development of a degradation assessment methodology; reviews of techniques and methods for inspection and repair of containment metallic pressure boundaries; evaluation of high-frequency acoustic imaging, magnetostrictive sensor, electromagnetic acoustic transducer, and multimode guided plate wave technologies for inspection of inaccessible regions of containment metallic pressure boundaries; development of a continuum damage mechanics-based approach for structural deterioration; establishment of a methodology for reliability-based condition assessments of steel containments and liners; and fragility assessments of steel containments with localized corrosion. In addition, data and information assembled under this program has been transferred to the technical community through review meetings and briefings, national and international conference participation, technical committee involvement, and publications of reports and journal articles. Appendix A provides a listing of program reports, papers, and publications; and Appendix B contains a listing of program-related presentations.

Naus, Dan J [ORNL; Ellingwood, B R [Georgia Institute of Technology; Oland, C Barry [ORNL

2005-09-01T23:59:59.000Z

229

Inspection Report: S05IS042 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

S05IS042 September 27, 2005 Inspection Letter Report on "Inspection of Possible Ethics Violation" Not Available for Viewing More Documents & Publications Inspection Report:...

230

Inspection Report: IG-0530 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0 0 Inspection Report: IG-0530 November 9, 2001 Inspection of the Management of Personal Property at the Ashtabula Environmental Management Project The Office of Inspector General (OIG), U.S. Department of Energy, conducted an inspection to review the management of accountable Government-owned personal property at the Department's Ashtabula Environmental Management Project (Ashtabula) in Ashtabula, Ohio. Earthline Technologies (Earthline), formerly RMI Environmental Services, is the Department's environmental restoration contractor at Ashtabula. Earthline is a division of RMI Titanium Company headquartered in Niles, Ohio. Inspection Report: IG-0530 More Documents & Publications Audit Report: IG-0541 Inspection Report: INS-L-01-05 Inspection Report: IG-0576

231

Independent Oversight Inspection, Lawrence Livermore National Laboratory -  

Broader source: Energy.gov (indexed) [DOE]

Inspection, Lawrence Livermore National Inspection, Lawrence Livermore National Laboratory - May 2007 Independent Oversight Inspection, Lawrence Livermore National Laboratory - May 2007 May 2007 Inspection of Environment, Safety, and Health Programs at the Lawrence Livermore National Laboratory The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), conducted an inspection of environment, safety, and health (ES&H) programs at the DOE Lawrence Livermore National Laboratory (LLNL) during January and February 2007. The inspection was performed by Independent Oversight's Office of Environment, Safety and Health Evaluations. LSO's oversight has matured, and operational awareness and assessments have improved in gathering data and identifying deficiencies. LSO

232

Independent Oversight Inspection, Argonne National Laboratory - East,  

Broader source: Energy.gov (indexed) [DOE]

Independent Oversight Inspection, Argonne National Laboratory - Independent Oversight Inspection, Argonne National Laboratory - East, Summary Report - May 2002 Independent Oversight Inspection, Argonne National Laboratory - East, Summary Report - May 2002 May 2002 Inspection of Environment, Safety, and Health and Emergency Management at the Argonne National Laboratory - East The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) programs and emergency management programs at the Department of Energy's (DOE) Argonne National Laboratory (ANL) in April and May 2002. The inspection was performed as a joint effort by the OA Office of Environment, Safety and Health Evaluations and the Office of Emergency Management Oversight.

233

Inspection Report: IG-0660 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

60 60 Inspection Report: IG-0660 August 30, 2004 Inspection Report on "Internal Controls Over the Accountability of Computers at Sandia National Laboratory, New Mexico The Office of Inspector General initiated an inspection to determine the adequacy of internal controls over the extensive inventory of laptop and desktop computers at Sandia National Laboratory, New Mexico. Computers are used in the full range of operations at Sandia, to include processing classified information. Department of Energy (DOE) and Sandia property policies identify computers as "sensitive property," due largely to their susceptibility to theft and misappropriation. Inspection Report: IG-0660 More Documents & Publications Inspection Report: IG-0597 Inspection Report: IG-0455

234

Evaluation of inservice inspection examinatiions  

SciTech Connect (OSTI)

In order to evaluate the effectiveness of Section 11, Division 1, ``Rules for Inservice Inspection of Nuclear Power Plant Components,`` of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code examinations, 26 inservice inspection (ISI) summary reports from 24 facilities were reviewed. It was found that these ASME Code examinations and tests are instrumental in revealing indications and defects in welds and plant components. In addition, this study uncovered that fact that some of the Section 11 requirements are apparently not clear and are misunderstood by some of the facilities. Also, the need for more stringent requirements was evaluated and some Code changes are recommended.

Aldrich, D.A.; Cook, J.F.

1990-05-01T23:59:59.000Z

235

Evaluation of inservice inspection examinatiions  

SciTech Connect (OSTI)

In order to evaluate the effectiveness of Section 11, Division 1, Rules for Inservice Inspection of Nuclear Power Plant Components,'' of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code examinations, 26 inservice inspection (ISI) summary reports from 24 facilities were reviewed. It was found that these ASME Code examinations and tests are instrumental in revealing indications and defects in welds and plant components. In addition, this study uncovered that fact that some of the Section 11 requirements are apparently not clear and are misunderstood by some of the facilities. Also, the need for more stringent requirements was evaluated and some Code changes are recommended.

Aldrich, D.A.; Cook, J.F.

1990-05-01T23:59:59.000Z

236

A tiered modelling approach for condition based maintenance of industrial assets with load sharing interaction and fault propagation  

E-Print Network [OSTI]

of one or more of the critical components, thus causing the asset to deteriorate faster than the normal rate. For instance, stay cables are some of the most important elements in span bridge. It consists of multiple parallel wires (critical components... need from the lower layer. Using this information, the optimal maintenance and inspection strategies can be found directly using equation (1) and (2). 4. Conclusion Motivated by industrial cases such as maintenance of stay cables, we propose a 2-tiered...

Liang, Zhenglin; Parlikad, Ajith Kumar

2014-05-24T23:59:59.000Z

237

Review of Gas Transmission Pipeline Repair Methods  

Science Journals Connector (OSTI)

Repair methods are key operations for the integrity management of pipelines. The parameters guiding the repair decision are briefly reminded. A nonexhaustive external and internal repair techniques are described,...

Remi Batisse

2008-01-01T23:59:59.000Z

238

Reliability-Centered Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Reliability-Centered Maintenance Reliability-Centered Maintenance Reliability-Centered Maintenance October 7, 2013 - 9:48am Addthis Reliability-centered maintenance leverages the same practices and technologies of predictive maintenance. The difference is that reliability-centered maintenance recognizes that: Equipment design and operations differ Different equipment has different probabilities of failure All equipment is not of equal importance to facility operations Facilities have limited financial and personnel resources. While reliability-centered maintenance relies on predictive maintenance practices and technologies, it also recognizes that maintenance on inexpensive and/or unimportant equipment may be better served by a reactive or predictive maintenance approach. Each of the aforementioned factors are

239

Federal Energy Management Program: Reactive Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Reactive Reactive Maintenance to someone by E-mail Share Federal Energy Management Program: Reactive Maintenance on Facebook Tweet about Federal Energy Management Program: Reactive Maintenance on Twitter Bookmark Federal Energy Management Program: Reactive Maintenance on Google Bookmark Federal Energy Management Program: Reactive Maintenance on Delicious Rank Federal Energy Management Program: Reactive Maintenance on Digg Find More places to share Federal Energy Management Program: Reactive Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types

240

Federal Energy Management Program: Operations and Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Operations and Operations and Maintenance to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance on Google Bookmark Federal Energy Management Program: Operations and Maintenance on Delicious Rank Federal Energy Management Program: Operations and Maintenance on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Major Equipment Types Resources

Note: This page contains sample records for the topic "inspection maintenance repairs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Federal Energy Management Program: Preventive Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Preventive Preventive Maintenance to someone by E-mail Share Federal Energy Management Program: Preventive Maintenance on Facebook Tweet about Federal Energy Management Program: Preventive Maintenance on Twitter Bookmark Federal Energy Management Program: Preventive Maintenance on Google Bookmark Federal Energy Management Program: Preventive Maintenance on Delicious Rank Federal Energy Management Program: Preventive Maintenance on Digg Find More places to share Federal Energy Management Program: Preventive Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types

242

CX-009354: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Determination CX-009354: Categorical Exclusion Determination High Resolution 3D Laser Imaging for Inspection, Maintenance, Repair and Operations - Phase II CX(s) Applied:...

243

CX-009331: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Determination CX-009331: Categorical Exclusion Determination High Resolution 3D Laser Imaging for Inspection, Maintenance, Repair and Operations Phase II CX(s) Applied:...

244

Best Management Practice #8: Boiler and Steam Systems | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

implement a routine inspection and maintenance program to check steam traps and steam lines for leaks. Repair leaks and replace faulty steam traps as soon as possible. Develop...

245

The Pennsylvania State University Confined Space Entry Program and Procedures  

E-Print Network [OSTI]

or periodically for inspection, maintenance, cleaning or repair. #12;3 Examples of confined spaces are), boilers, compartments, ducts, sewers, pipelines, distribution tunnels, manholes, grease traps, dumpster

Maroncelli, Mark

246

Tim Kuneli, Electronics Maintenance Group  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tim Kuneli, Electronics Maintenance Group Print The recent ALS power supply failure was one of the most challenging projects that Electronics Engineer Technical Superintendent Tim...

247

Turfgrass: Maintenance Costs in Texas.  

E-Print Network [OSTI]

LAW FOR VARIOUS M-AINTENANCE ITEMS BASED ON O\\!'\\'S. ERSHIP AND TYPE OF GRASS WITHIN EACH REGION Maintenance items TY PC Percent Lot size, Region of oz;r- of lawns square Com~osty Fertilizer Chemicals Water Average grass in region feet cost cost... LAW FOR VARIOUS M-AINTENANCE ITEMS BASED ON O\\!'\\'S. ERSHIP AND TYPE OF GRASS WITHIN EACH REGION Maintenance items TY PC Percent Lot size, Region of oz;r- of lawns square Com~osty Fertilizer Chemicals Water Average grass in region feet cost cost...

Holt, Ethan C.; Allen, W. Wayne; Ferguson, Marvin H.

1964-01-01T23:59:59.000Z

248

Sustainability of green space maintenance  

E-Print Network [OSTI]

In Japan, recent changes in socio-economic and political structures -- decreasing tax revenue, declining communication among community members, and privatization of public services-- have influenced existing maintenance ...

Nomura, Wataru

2011-01-01T23:59:59.000Z

249

Maintenance Types | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

prevent failure, or ensure life of the system even if actions are suggested by the manufacturer. Preventive Maintenance: Refers to a series of actions performed on calendar time...

250

Requirements for Bridge Inspection | Department of Energy  

Energy Savers [EERE]

Requirements for Bridge Inspection Requirements for Bridge Inspection 2009.09.14 OECM-Requirements for Bridge Insp.pdf More Documents & Publications 2009.09.14OECM-Requirementsfo...

251

Piping inspection carriage having axially displaceable sensor  

DOE Patents [OSTI]

A pipe inspection instrument carriage for use with a pipe crawler for performing internal inspections of piping surfaces. The carriage has a front leg assembly, a rear leg assembly and a central support connecting the two assemblies and for mounting an instrument arm having inspection instruments. The instrument arm has a y-arm mounted distally thereon for axially aligning the inspection instrumentation and a mounting block, a linear actuator and axial movement arm for extending the inspection instruments radially outward to operably position the inspection instruments on the piping interior. Also, the carriage has a rotation motor and gear assembly for rotating the central support and the front leg assembly with respect to the rear leg assembly so that the inspection instruments azimuthally scan the piping interior. The instrument carriage allows performance of all piping inspection operations with a minimum of moving parts, thus decreasing the likelihood of performance failure.

Zollinger, William T. (Martinez, GA); Treanor, Richard C. (Augusta, GA)

1994-01-01T23:59:59.000Z

252

Inspection Report: IG-0464 | Department of Energy  

Office of Environmental Management (EM)

Inspection Report: IG-0464 Inspection Report: IG-0464 March 22, 2000 Follow-on Review of the Status of the U.S. Department of Energy's Counterintelligence Implementation Plan The...

253

Independent Oversight Inspection, Los Alamos National Laboratory...  

Broader source: Energy.gov (indexed) [DOE]

of an inspection of emergency management at the Department of Energy's (DOE) Nevada Test Site. The inspection was conducted in March and April 2007 by the DOE Office of...

254

U.S. Seafood Inspection and HACCP  

Science Journals Connector (OSTI)

Currently there is increasing consumer concern and public perception that seafood is unsafe and requires more federal inspection ... 1986, 1987, 1989; Uva 1989). Seafood inspection is therefore one of the most .....

E. Spencer Garrett; Martha Hudak-Roos

1991-01-01T23:59:59.000Z

255

Inspection Report: IG-0578 | Department of Energy  

Office of Environmental Management (EM)

8 Inspection Report: IG-0578 December 19, 2002 Inspection of Explosives Safety at Selected Department of Energy Sites The Office of Inspector General, U.S. Department of Energy...

256

Inspection Report: IG-0682 | Department of Energy  

Office of Environmental Management (EM)

Documents & Publications Review of Status of Prior Export Control Recommendations at the Department of Energy, INS-O-07-01 Inspection Report: INS-O-07-01 Inspection Report: IG-072...

257

Longview District Operations and Maintenance Headquarters: Environmental assessment  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) operations and maintenance staff are presently based at a headquarters next to the Longview Substation. These headquarters buildings, however, were built in 1941 and have deteriorated to the point of needing extensive repair. They also lack sufficient inside storage space. New buildings cannot be constructed on the site because of surrounding development. In addition, the site is within an area exposed to industrial fallout (coal tar pitch and metallic particles) that may be damaging buildings, equipment, and vehicles. BPA is concerned about the potential health risk to headquarters staff from the fallout. In light of these problems, BPA proposes to construct a new operations and maintenance headquarters at a different location, and to demolish the existing headquarters. This paper discusses the environmental impacts of the proposed action and alternatives.

Not Available

1992-03-01T23:59:59.000Z

258

Longview District Operations and Maintenance Headquarters : Environmental Assessment.  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) operations and maintenance staff are presently based at a headquarters next to the Longview Substation. These headquarters buildings, however, were built in 1941 and have deteriorated to the point of needing extensive repair. They also lack sufficient inside storage space. New buildings cannot be constructed on the site because of surrounding development. In addition, the site is within an area exposed to industrial fallout (coal tar pitch and metallic particles) that may be damaging buildings, equipment, and vehicles. BPA is concerned about the potential health risk to headquarters staff from the fallout. In light of these problems, BPA proposes to construct a new operations and maintenance headquarters at a different location, and to demolish the existing headquarters. This paper discusses the environmental impacts of the proposed action and alternatives.

United States. Bonneville Power Administration.

1992-03-01T23:59:59.000Z

259

Plant maintenance and plant life extension issue, 2008  

SciTech Connect (OSTI)

The focus of the March-April issue is on plant maintenance and plant life extension. Major articles include the following: Exciting time to be at the U.S. NRC, by Dale Klein, Nuclear Regulatory Commission; Extraordinary steps to ensure a minimal environmental impact, by George Vanderheyden, UniStar Nuclear Energy, LLC.; Focused on consistent reduction of outages, by Kevin Walsh, GE Hitachi Nuclear Energy; On the path towards operational excellence, by Ricardo Perez, Westinghouse Electric Company; Ability to be refuelled on-line, by Ian Trotman, CANDU Services, Atomic Energy of Canada, Ltd.; ASCA Application for maintenance of SG secondary side, by Patrick Wagner, Wolf Creek Nuclear Operating Corporation, Phillip Battaglia and David Selfridge, Westinghouse Electric Company; and, An integral part of the landscape and lives, by Tyler Lamberts, Entergy Nuclear Operations, Inc. The Industry Innovation article is titled Steam generator bowl drain repairs, by John Makar and Richard Gimple, Wolf Creek Nuclear Operating Corporation.

Agnihotri, Newal (ed.)

2008-03-15T23:59:59.000Z

260

Robot-Assisted Bridge Inspection  

Science Journals Connector (OSTI)

The Center for Robot-Assisted Search and Rescue (CRASAR®) deployed a customized AEOS man-portable unmanned surface vehicle and two commercially available underwater vehicles (the autonomous YSI EcoMapper and the tethered VideoRay) for inspection ... Keywords: Security and rescue robots, Underwater unmanned vehicles

Robin R. Murphy; Eric Steimle; Michael Hall; Michael Lindemuth; David Trejo; Stefan Hurlebaus; Zenon Medina-Cetina; Daryl Slocum

2011-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "inspection maintenance repairs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Robotic Welding and Inspection System  

SciTech Connect (OSTI)

This paper presents a robotic system for GTA welding of lids on cylindrical vessels. The system consists of an articulated robot arm, a rotating positioner, end effectors for welding, grinding, ultrasonic and eddy current inspection. Features include weld viewing cameras, modular software, and text-based procedural files for process and motion trajectories.

H. B. Smartt; D. P. Pace; E. D. Larsen; T. R. McJunkin; C. I. Nichol; D. E. Clark; K. L. Skinner; M. L. Clark; T. G. Kaser; C. R. Tolle

2008-06-01T23:59:59.000Z

262

BUILDING INSPECTION Building, Infrastructure, Transportation  

E-Print Network [OSTI]

Sacramento, Ca 95814-5514 Re: Green Building Ordinance and the Building Energy Efficiency Standards Per and lower energy usage was reviewed. This factor is contained in the adopted Green Building Code Section 9 for the May 5, 2010 California Energy Commission business meeting. Thank you. John LaTorra Building Inspection

263

Industrial Use of Infrared Inspections  

E-Print Network [OSTI]

, but in the final analysis it comes down to the fact that the industrial management responsible for the operations and production budgets did not, and in many cases, still does not understand the economic benefits to the company that infrared industrial inspections...

Duch, A. A.

1979-01-01T23:59:59.000Z

264

Mechanical Operations and Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Holiday Work Status Holiday Work Status Mechanical Operations & Maintenance Group APS Storage Ring Magnets The Advanced Photon Source (APS) at the Argonne National Laboratory is a national synchrotron-radiation research facility funded by the U.S. Department of Energy. Using high-brilliance x-ray beams from the APS, an international community of scientists conducts forefront basic and applied research in the fields of material science, biological science, physics, chemistry, environmental, geophysical and planetary science. The 1.1-km circumference APS facility consists of several major subsystems including magnets, vacuum chambers, radio-frequency cavities, diagnostics instrumentation, x-ray absorbers and apertures, and cooling water subsystems. Each of these subsystems contains hundreds of mechanical

265

Inspection Report: IG-0372 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Administration Inspection Report: IG-0372 More Documents & Publications EIS-0171: Final Environmental Impact Statement Microsoft Word - competitionincontractingguidev2.doc Before...

266

Adhesive technologies in repairing polyethylene pipelines  

Science Journals Connector (OSTI)

Adhesive technologies for repairing polyethylene pipelines are considered taking into account the peculiarities ... the modified binder for application in the gluing repair technologies under consideration. It is...

V. F. Stroganov

2014-07-01T23:59:59.000Z

267

Restore: Modeling Repair and Restoration Processes | Argonne...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Restore: Modeling Repair and Restoration Processes Restore: Modeling Repair and Restoration Processes Argonne's Restore software models complex sets of steps required to accomplish...

268

Earth Repair: A Transatlantic History of Environmental Restoration  

E-Print Network [OSTI]

Earth Repair: A Transatlantic History of EnvironmentalHall. Earth Repair: A Transatlantic History of Environmental

Hamilton-Smith, Elery

2006-01-01T23:59:59.000Z

269

Inspection Report Follow-up Inspection on Security Clearance Terminations and Badge  

Broader source: Energy.gov (indexed) [DOE]

Inspection Report Inspection Report Follow-up Inspection on Security Clearance Terminations and Badge Retrieval at the Lawrence Livermore National Laboratory INS-L-12-02 March 2012 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 March 6, 2012 MEMORANDUM FOR THE ASSOCIATE ADMINISTRATOR FOR DEFENSE NUCLEAR SECURITY MANAGER, LIVERMORE SITE OFFICE FROM: Sandra D. Bruce Assistant Inspector General for Inspections Office of Inspector General SUBJECT: INFORMATION: Inspection Report on "Follow-up Inspection on Security Clearance Terminations and Badge Retrieval at the Lawrence Livermore National Laboratory" BACKGROUND The Department of Energy's Lawrence Livermore National Laboratory (Livermore) is managed

270

MaintenanceRecords  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1/22/2010 1/22/2010 4,894 Changed oil and filter $60.70 12/18/2010 10,075 Changed oil and filter $60.70 12/22/2010 10,651 Replaced driver-side headlight $32.78 2/18/2011 20,255 Changed oil and filter $60.70 3/29/2011 25,267 Changed oil and filter $60.70 5/16/2011 30,509 Changed oil and filter and replaced fanbelt $116.20 6/28/2011 34,831 Replaced alternator/water pump belt and tow fees $80.50 7/8/2011 35,652 Changed oil and filter and replaced air filter $80.88 7/13/2011 35,885 Installed two tires $277.25 7/27/2011 36,982 Towed vehicle and replaced alternator/water pump belt $300.00 8/8/2011 37,738 Repaired left front tire $10.00 9/1/2011 40,384 Replaced alternator belt $45.00 9/8/2011 40,948 Changed oil and filter $60.70 10/22/2011 43,484 30K mile service $192.45 10/26/2011 43,492 Replaced front brake pads and cleaned and adjusted rear brake shoes

271

Experimental flight test vibration measurements and nondestructive inspection on a USCG HC-130H aircraft  

SciTech Connect (OSTI)

This paper presents results of experimental flight test vibration measurements and structural inspections performed by the Federal Aviation Administration`s Airworthiness Assurance NDI Validation Center (AANC) at Sandia National Laboratories and the US Coast Guard Aircraft Repair and Supply Center (ARSC). Structural and aerodynamic changes induced by mounting a Forward Looking Infrared (FLIR) system on a USCG HC-130H aircraft are described. The FLIR adversely affected the air flow characteristics and structural vibration on the external skin of the aircraft`s right main wheel well fairing. Upon initial discovery of skin cracking and visual observation of skin vibration in flight by the FLIR, a baseline flight without the FLIR was conducted and compared to other measurements with the FLIR installed. Nondestructive inspection procedures were developed to detect cracks in the skin and supporting structural elements and document the initial structural condition of the aircraft. Inspection results and flight test vibration data revealed that the FLIR created higher than expected flight loading and was the possible source of the skin cracking. The Coast Guard performed significant structural repair and enhancement on this aircraft, and additional in-flight vibration measurements were collected on the strengthened area both with and without the FLIR installed. After three months of further operational FLIR usage, the new aircraft skin with the enhanced structural modification was reinspected and found to be free of flaws. Additional US Coast Guard HC-130H aircraft are now being similarly modified to accommodate this FLIR system. Measurements of in-flight vibration levels with and without the FLIR installed, and both before and after the structural enhancement and repair were conducted on the skin and supporting structure in the aircraft`s right main wheel fairing. Inspection results and techniques developed to verify the aircraft`s structural integrity are discussed.

Moore, D.G.; Jones, C.R. [Sandia National Labs., Albuquerque, NM (United States). FAA Airworthiness Assurance NDI Validation Center; Mihelic, J.E.; Barnes, J.D. [Coast Guard Aircraft Repair and Supply Center, Elizabeth City, NC (United States)

1998-08-01T23:59:59.000Z

272

Landscape Maintenance Considerations for Homeowner  

E-Print Network [OSTI]

Landscape Maintenance Considerations for Homeowner Associations: Save Money, Be Safe, Look Good is getting their money's worth from the landscape maintenance company. Photo credit: Asset Landscaping! Kelly Murray Young Haley Paul #12;1. Consider landscape plants a long- term investment · Trees

Sanderson, Mike

273

OpenEI Community - Maintenance  

Open Energy Info (EERE)

maintenance maintenance March 8-9, 2013 http://en.openei.org/community/blog/openei-maintenance-march-8-9-2013  We would like to inform the OpenEI community that OpenEI will be undergoing a significant software upgrade during a maintenance window this weekend.  We will be upgrading the wiki and semantic mediawiki portions of OpenEI, which means /datasets, /apps, /lod, /sparql and /community will continue to function normally.  Additionally, web services that rely on Ask queries (utility rate database API) may have some downtime as we transition.maintenance-march-8-9-2013" target="_blank">read more

274

Federal Energy Management Program: Predictive Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to someone by E-mail to someone by E-mail Share Federal Energy Management Program: Predictive Maintenance on Facebook Tweet about Federal Energy Management Program: Predictive Maintenance on Twitter Bookmark Federal Energy Management Program: Predictive Maintenance on Google Bookmark Federal Energy Management Program: Predictive Maintenance on Delicious Rank Federal Energy Management Program: Predictive Maintenance on Digg Find More places to share Federal Energy Management Program: Predictive Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types Resources

275

Independent Oversight Inspection, Brookhaven National Laboratory -  

Broader source: Energy.gov (indexed) [DOE]

September 2008 September 2008 Independent Oversight Inspection, Brookhaven National Laboratory - September 2008 September 2008 Inspection of Emergency Management at the Brookhaven Site Office and Brookhaven National Laboratory The U.S. Department of Energy (DOE) Office of Independent Oversight inspected the emergency management program at DOE's Brookhaven National Laboratory (BNL) in June/July 2008. The inspection was performed by Independent Oversight's Office of Emergency Management Oversight (HS-63). This 2008 inspection found that hazardous material inventories remain low, and the program has been significantly improved by the issuance of a hazards survey, EPHAs, and revised emergency plan, as well as other upgraded program plans and procedures. Additionally, the EOC is better

276

Fuselage disbond inspection procedure using pulsed thermography  

Science Journals Connector (OSTI)

One use of pulsed thermography that has shown promise in aircraft inspection for some time is an inspection for disbonds in metallic structures. The FAA has funded research at Wayne State University in this area and Boeing identified a specific inspection requirement for disbonds on Boeing 747 aircraft. Laboratory and subsequent field testing monitored by the AANC has demonstrated the reliability of this type of inspection. As a result Boeing expects to approve a general fuselage disbond inspection procedure using pulsed thermography in the 2nd Quarter of 2001.

Mike Ashbaugh; Jeffrey G. Thompson

2002-01-01T23:59:59.000Z

277

Human Factors/Ergonomics Handbook for the Design for the Ease of Maintenance  

Broader source: Energy.gov (indexed) [DOE]

113 3.0 WORKSPACE, STORAGE, AND WORKSHOP DESIGN 3.1 Workspace and operations in non-workshop areas 3.1.1 Workspace 3.1.1.1 General Maintenance clearance. To provide adequate clearance for maintainers and to provide sufficient space to accommodate tools, test equipment, procedures, and other job aids during an in-place repair, a nominal 914 mm (36 in.) maintenance clearance should be provided around all major system components and piping of 610 mm (24 in.) diameter and larger. 3.1.1.1 Console floor space. Whenever feasible, free floor space of at least 1.22 m (48 in.) should be provided in front of consoles used by maintenance personnel. For equipment racks that require maintenance, free floor space should be provided in accordance with the criteria given below.

278

MaintenanceRecords  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7BA003539 7BA003539 Maintenance Sheet for 2011 Hyundai Sonata Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 7/19/2011 5,720 Changed oil and filter $14.67 10/12/2011 11,152 Changed oil and filter and rotated tires $60.49 10/21/2011 12,342 Upgraded ECU (TG5), replaced NVLD pressure sensor (TG6), and replaced cooling fan resistor (TG8) warranty 11/21/2011 16,442 Changed oil and filter $43.22 12/20/2011 22,497 Changed oil and filter and rotated tires $56.85 1/24/2012 28,205 Changed oil and filter $41.85 2/6/2012 30,100 30K service $109.16 2/9/2012 30,460 Recall: replaced two high voltage connectors at the HPCU n/c 2/27/2012 33,208 Changed oil and filter and rotated tires $56.85 3/24/2012 40,809 Changed oil and filter $41.85 4/20/2012 47,580 Changed oil and filter and rotated tires

279

BENCHMARKING EMERGING PIPELINE INSPECTION TECHNOLOGIES  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Benchmarking Emerging Pipeline Inspection Technologies To Department of Energy National Energy Technology Laboratory (NETL) DE-AP26-04NT40361 and Department of Transportation Research and Special Programs Administration (RSPA) DTRS56-02-T-0002 (Milestone 7) September 2004 Final Report on Benchmarking Emerging Pipeline Inspection Technologies Cofunded by Department of Energy National Energy Technology Laboratory (NETL) DE-AP26-04NT40361 and Department of Transportation Research and Special Programs Administration (RSPA) DTRS56-02-T-0002 (Milestone 7) by Stephanie A. Flamberg and Robert C. Gertler September 2004 BATTELLE 505 King Avenue Columbus, Ohio 43201-2693 Neither Battelle, nor any person acting on their behalf: (1) Makes any warranty or representation, expressed or implied, with respect to the

280

Drum inspection robots: Application development  

SciTech Connect (OSTI)

Throughout the Department of Energy (DOE), drums containing mixed and low level stored waste are inspected, as mandated by the Resource Conservation and Recovery Act (RCRA) and other regulations. The inspections are intended to prevent leaks by finding corrosion long before the drums are breached. The DOE Office of Science and Technology (OST) has sponsored efforts towards the development of robotic drum inspectors. This emerging application for mobile and remote sensing has broad applicability for DOE and commercial waste storage areas. Three full scale robot prototypes have been under development, and another project has prototyped a novel technique to analyze robotically collected drum images. In general, the robots consist of a mobile, self-navigating base vehicle, outfitted with sensor packages so that rust and other corrosion cues can be automatically identified. They promise the potential to lower radiation dose and operator effort required, while improving diligence, consistency, and documentation.

Hazen, F.B. [Fernald Environmental Restoration Management Corp., Cincinnati, OH (United States); Warner, R.D. [USDOE, Washington, DC (United States)

1996-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "inspection maintenance repairs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Apparatus for inspecting fuel elements  

DOE Patents [OSTI]

This disclosure describes an alpha monitor usable in an automated nuclear fuel pin loading and processing unit. Fuel pins or other elongated pins are fed laterally into the alpha monitor in a singular fashion and are translated by a first roller assembly into a weld flare machining and decontamination substation not forming a part of the invention. Pins return and are lifted upwardly and transferred across to a combined pin lifting and electrode operating means which lifts the pins upwardly into a clamshell electrode assembly which is spread open by a combined pin lifting and electrode operating means. Once inserted the clamshell type electrode arrangement closes around the fuel pins so that inspection can occur. Fuel pins are inspected by charging electrodes to a negative potential and measuring the change in charge occurring when positively charged alpha particles strike the negatively charged electrodes. After inspection, the fuel pins are lowered by the pin lifting and electrode operating means into a second roller assembly which longitudinally conveys approved pins from the airtight enclosure in which the alpha monitor is mounted. If the fuel pins are rejected then they are moved laterally by a second transfer means and onto another system for further processing.

Kaiser, B.J.; Oakley, D.J.; Groves, O.J.

1984-12-21T23:59:59.000Z

282

A survey of repair practices for nuclear power plant containment metallic pressure boundaries  

SciTech Connect (OSTI)

The Nuclear Regulatory Commission has initiated a program at the Oak Ridge National Laboratory to provide assistance in their assessment of the effects of potential degradation on the structural integrity and leaktightness of metal containment vessels and steel liners of concrete containments in nuclear power plants. One of the program objectives is to identify repair practices for restoring metallic containment pressure boundary components that have been damaged or degraded in service. This report presents issues associated with inservice condition assessments and continued service evaluations and identifies the rules and requirements for the repair and replacement of nonconforming containment pressure boundary components by welding or metal removal. Discussion topics include base and welding materials, welding procedure and performance qualifications, inspection techniques, testing methods, acceptance criteria, and documentation requirements necessary for making acceptable repairs and replacements so that the plant can be returned to a safe operating condition.

Oland, C.B.; Naus, D.J. [Oak Ridge National Lab., TN (United States)

1998-05-01T23:59:59.000Z

283

Large steam turbine repair: A survey  

SciTech Connect (OSTI)

This report covers a survey taken to document the current state-of-the-art in repairs to large steam turbines. One objective was to provide information to assist utilities in making repair or replacement decisions. The survey revealed that a large number of repairs have been successfully repaired involving both mechanical and welding repair techniques. Repair techniques have been improving in recent years and are being used more frequently. No guidelines or codes exist for the repair of steam turbine components so each repair is primarily controlled by agreement between the utility, contractor and insurer. Types of repairs are reviewed in this report and in addition, the capabilities of various contractors who are currently active in providing repair service. 40 refs., 10 figs., 4 tabs.

Findlan, S.J.; Lube, B. (EPRI Nondestructive Evaluation Center, Charlotte, NC (United States))

1991-07-01T23:59:59.000Z

284

The air transportation industry birthplace of reliability-centered maintenance  

SciTech Connect (OSTI)

The 1980s and 1970s provided a timely opportunity for examining and radically changing the process called {open_quotes}preventive maintenance{close_quotes} as it is applied to the aircraft used for scheduled air transportation. The Federal Aviation Administration and four major airlines, United, American, Pan American and Trans World, were the {open_quotes}principals{close_quotes} in that process. While United`s work with the FAA on the Boeing 737 had opened the door a crack, the Boeing 747 presented a major opportunity to radically improve the process for maintenance program design. That program was guided by the results of United`s analyses of failure data from operations of several fleets, each larger than 100 aircraft, and the concurrent experience of American, Pan American and Trans World. That knowledge provided the insights necessary to support an entirely different approach to maintenance program design. As a result, while United`s existing maintenance program required scheduled overhaul of 339 items on each DC-8, it required overhaul of only 8 items on the B-7471 Although the initial thrust of that work focused on components of active systems, there was concurrent work focused on items whose principal function was to carry the loads associated with operations. That program focused on the classification of structurally-significant items and their classification as {open_quotes}safe life{close_quotes} or {open_quotes}damage tolerant{close_quote} to determine what periodic replacements or repeated inspections were required. That work came to the attention of the Department of Defense which supported preparation of the book-length report by F. Stanley Nowlan and Howard F. Heap at United Airlines entitled {open_quote}Reliability-Centered maintenance{close_quotes}.

Matteson, T.D.

1996-08-01T23:59:59.000Z

285

Inspection effectiveness and risk in process industries  

SciTech Connect (OSTI)

Failures occasionally occur in refinery and petrochemical process equipment due to in-service damage such as internal corrosion, external corrosion, or stress corrosion cracking. Many of these failures should be preventable by detection of the damage prior to failure. However, selection of an inspection method for detection of damage has not always been based upon an evaluation of the required inspection effectiveness. Resources can be wasted by using an inspection method that is incapable of detecting damage, or is so unlikely to detect damage that it may be considered to be ineffective. Another waste of resources is excessive inspection, where the amount of inspection effort is not matched to the benefit. This paper outlines an approach to quantify the effectiveness of the complete inspection method, here defined as all of the elements that determine the mechanical integrity of an equipment item. This paper demonstrates the use of simple statistical tools or experimental techniques for estimating the effectiveness of an inspection method, and using this estimate in a risk evaluation. The approach is used to update the estimated severity of damage in process equipment after an inspection has been performed. The result of the analysis can be used in a risk assessment to estimate the risk associated with equipment failure before and after an inspection, thus providing a powerful tool to realistically set priorities for inspection planning.

Conley, M.J.; Tallin, A.G. [DNV, Houston, TX (United States)

1996-12-01T23:59:59.000Z

286

Federal Energy Management Program: Computerized Maintenance Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Computerized Computerized Maintenance Management Systems to someone by E-mail Share Federal Energy Management Program: Computerized Maintenance Management Systems on Facebook Tweet about Federal Energy Management Program: Computerized Maintenance Management Systems on Twitter Bookmark Federal Energy Management Program: Computerized Maintenance Management Systems on Google Bookmark Federal Energy Management Program: Computerized Maintenance Management Systems on Delicious Rank Federal Energy Management Program: Computerized Maintenance Management Systems on Digg Find More places to share Federal Energy Management Program: Computerized Maintenance Management Systems on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

287

Operations and Maintenance | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Operations and Maintenance Operations and Maintenance Federal facilities rely on pumps, motors, fans, and other mechanical systems for everyday operations. These systems must be...

288

Operations and Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Operations and Maintenance Operations and Maintenance Federal facilities rely on pumps, motors, fans, and other mechanical systems for everyday operations. These systems...

289

Operations and Maintenance Management Support  

Broader source: Energy.gov [DOE]

Federal operations and maintenance (O&M) programs must gain full support from management to succeed. Management understanding and buying into the program elevates O&M importance and allows...

290

Cleaning, Maintenance, and Janitorial Needs  

Science Journals Connector (OSTI)

The contamination control facility, including all items that may come into contact with products, requires regular maintenance and cleaning. The products produced in the cleanroom facility are typically sensitive...

Alvin Lieberman

1992-01-01T23:59:59.000Z

291

Sustainable Operations & Maintenance Implementation Support  

E-Print Network [OSTI]

, and purchasing policy: Energy efficiency cannot exist without accountability and organizational support energy efficiency in buildings. Organizational innovation for energy conservation; Organizations face of energy efficiency. Meetings with facilities personnel, maintenance staff, building managers, building oc

292

Maintenance Practices for LED Streetlights  

Broader source: Energy.gov [DOE]

This April 14, 2014 webinar answered important questions about the maintenance and reliability of LED streetlights, and how to take these issues into account when planning and preparing for a...

293

Operations and Maintenance Program Measurement  

Broader source: Energy.gov [DOE]

Operations and maintenance (O&M) measurement tends to focus on reliability as the sole metric. Every Federal agency wants a reliable facility, but this metric alone is not enough to build a...

294

Maintenance of DOE Technical Standards  

Broader source: Energy.gov (indexed) [DOE]

TECHNICAL STANDARDS TECHNICAL STANDARDS PROGRAM PROCEDURES DOE-TSPP-9 Revision: 5 Date: August 1, 2000 MAINTENANCE OF DOE TECHNICAL STANDARDS U.S. Department of Energy Office of Nuclear Safety Policy and Standards Washington, D.C. 20585 DOE-TSPP-9 Maintenance Revision: 5 Date: August 1, 2000 DOE Technical Standards Program i CONTENTS Paragraph Page 1. SCOPE........................................................................................................................................... 1 1.1 Purpose ................................................................................................................... 1 1.2 Applicability.............................................................................................................. 1

295

Independent Oversight Inspection, Lawrence Livermore National Laboratory,  

Broader source: Energy.gov (indexed) [DOE]

Inspection, Lawrence Livermore National Inspection, Lawrence Livermore National Laboratory, Volume I - December 2004 Independent Oversight Inspection, Lawrence Livermore National Laboratory, Volume I - December 2004 December 2004 Inspection of Environment, Safety, and Health Management at the Lawrence Livermore National Laboratory The U.S. Department of Energy (DOE) Office of Independent Oversight and Performance Assurance (OA), within the Office of Security and Safety Performance Assurance (SSA), conducted an inspection of environment, safety, and health (ES&H) at the DOE Lawrence Livermore National Laboratory (LLNL) during October and November 2004. The inspection was performed by the OA Office of Environment, Safety and Health Evaluations. LSO and LLNL have established ISM systems that are conceptually sound but

296

Independent Oversight Inspection, Lawrence Livermore National Laboratory -  

Broader source: Energy.gov (indexed) [DOE]

Lawrence Livermore National Lawrence Livermore National Laboratory - February 2009 Independent Oversight Inspection, Lawrence Livermore National Laboratory - February 2009 February 2009 Inspection of Emergency Management at the Livermore Site Office and Lawrence Livermore National Laboratory The U.S. Department of Energy (DOE) Office of Independent Oversight inspected the emergency management program at DOE's Lawrence Livermore National Laboratory (LLNL) in October/November 2008. The inspection was performed by Independent Oversight's Office of Emergency Management Oversight. This 2008 inspection found that overall, the LLNL emergency management program is, with a few exceptions, well defined and better implemented in most areas than observed during previous inspections, but some implementation weaknesses remain that diminish the ability of the program

297

System for inspection of stacked cargo containers  

DOE Patents [OSTI]

The present invention relates to a system for inspection of stacked cargo containers. One embodiment of the invention generally comprises a plurality of stacked cargo containers arranged in rows or tiers, each container having a top, a bottom a first side, a second side, a front end, and a back end; a plurality of spacers arranged in rows or tiers; one or more mobile inspection devices for inspecting the cargo containers, wherein the one or more inspection devices are removeably disposed within the spacers, the inspection means configured to move through the spacers to detect radiation within the containers. The invented system can also be configured to inspect the cargo containers for a variety of other potentially hazardous materials including but not limited to explosive and chemical threats.

Derenzo, Stephen (Pinole, CA)

2011-08-16T23:59:59.000Z

298

Independent Oversight Inspection, Pacific Northwest National Laboratory -  

Broader source: Energy.gov (indexed) [DOE]

Independent Oversight Inspection, Pacific Northwest National Independent Oversight Inspection, Pacific Northwest National Laboratory - December 2003 Independent Oversight Inspection, Pacific Northwest National Laboratory - December 2003 December 2003 Inspection of Environment, Safety, and Health Management at the Pacific Northwest National Laboratory The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) at the U.S. Department of Energy (DOE) Pacific Northwest National Laboratory (PNNL) during November and December 2003. The inspection was performed by the OA Office of Environment, Safety and Health Evaluations. Overall, implementation of ISM at PNNL has improved noticeably since the 1998 DOE Headquarters independent oversight evaluation. This improvement is

299

Reliability based inspection scheduling of floaters  

SciTech Connect (OSTI)

This paper presents the development and application of reliability based inspection planning techniques for floaters. Based on previous experience from jacket structure applications optimized inspection planning (OIP) techniques for floaters are developed. The differences between floaters and jacket structures in relation to fatigue damage, redundancy levels and inspection practice are examined and reflected in the proposed methodology. The application and benefits of these techniques is demonstrated through representative analyses and important trends are highlighted through the results of a parametric sensitivity study.

Onoufriou, T.; Simpson, R.J.; Protopapas, M.

1995-12-31T23:59:59.000Z

300

Building America Expert Meeting: Key Innovations for Adding Energy Efficiency to Maintenance Projects  

Broader source: Energy.gov [DOE]

This report describes an expert meeting hosted by the Building America research team NAHB Research Center, which was held on February 8, 2012, in Orlando, Florida. The topic, Key Innovations for Adding Energy Efficiency to Maintenance Projects, was intended to provide direction to more focused efforts to increase the efficiency of existing homes; in this meeting, the focus was specifically for re-roofing and the opportunities for adding energy efficiency upgrades during this major home repair activity.

Note: This page contains sample records for the topic "inspection maintenance repairs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Selected Bibliography on Electric Motor Repair | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Selected Bibliography on Electric Motor Repair Selected Bibliography on Electric Motor Repair The following series of repair documents related to electric motors were produced by...

302

Independent Oversight Inspection, Brookhaven National Laboratory - November  

Broader source: Energy.gov (indexed) [DOE]

November 2007 November 2007 Independent Oversight Inspection, Brookhaven National Laboratory - November 2007 November 2007 Inspection of Environment, Safety, and Health Programs at the Brookhaven National Laboratory The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), inspected environment, safety, and health (ES&H) programs at the DOE Brookhaven Site Office (BHSO) and Brookhaven National Laboratory (BNL) during August and September 2007. The ES&H inspection was performed by Independent Oversight's Office of Environment, Safety and Health Evaluations. BHSO has established mechanisms to gather performance data and provide feedback to laboratory management, which is resulting in improvements

303

Inspection Report: IG-0821 | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Inspection Report: IG-0821 Inspection Report: IG-0821 Inspection Report: IG-0821 September 11, 2009 Fire Suppression and Related Services at Los Alamos National Laboratory The Department of Energy's (DOE's) Los Alamos National Laboratory (LANL) is a multidisciplinary research institution engaged in strategic science on behalf of national security. LANL operates in "unique" hazard environments, to include special nuclear materials, explosives, and hazardous chemicals, that create special fire suppression and emergency management challenges. To address these challenges, LANL must have a comprehensive approach to the protection of personnel, facilities, physical assets, and programmatic activities from fire and related dangers. Topic: National Security and Safety Inspection Report: IG-0821

304

Inspection Report: IG-0488 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8 8 Inspection Report: IG-0488 November 20, 2000 Inspection of Selected Aspects of the Department of Energy's Classified Document Transmittal Process In view of recent concerns regarding the security of Department of Energy (DOE) classified information, including nuclear weapons information, we initiated an inspection to determine whether officials of the Department and its contractors, including officials of the National Nuclear Security Administration (NNSA) and its contractors, followed the Department's policies and procedures when transmitting classified documents to entities outside the Department. Inspection Report: IG-0488 More Documents & Publications Semiannual Report to Congress: October 1, 2000 - March 31, 2001 Special Report: IG-0538 Safety and Security Enforcement Process Overview

305

Robotic Wind Turbine Inspection | GE Global Research  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Trials GE Global Research is advancing technology that will make the inspection of wind turbines faster and more reliable for customers. Currently, an inspector examines the...

306

Inspection Report: IG-0455 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

XPS supercomputer (Paragon) by Sandia National Laboratories (Sandia), Albuquerque, New Mexico. This inspection was initiated at your request based on concerns that the sale of the...

307

Enduring Stockpile CMM Shell Inspection Plan (U)  

SciTech Connect (OSTI)

The slides are intended to serve as a high level summary of the CMM Shell Inspection Plan as presented to Pu Sustainment Legacy Pit Production IPT.

Montano, Joshua D. [Los Alamos National Laboratory; Flores, Randy A. [Los Alamos National Laboratory

2012-06-13T23:59:59.000Z

308

Independent Oversight Inspection, Los Alamos National Laboratory...  

Energy Savers [EERE]

The inspection was performed as a joint effort by Independent Oversight's Office of Safeguards and Security Evaluations (HS-61), Office of Cyber Security (HS-62), and Office of...

309

Inspection Report: IG-0755 | Department of Energy  

Office of Environmental Management (EM)

of the Department of Energy's (Department) efforts to identify and deter potential threats to its facilities and personnel is the Department Canine Program. Inspection Report:...

310

Independent Oversight Inspection, Nevada Test Site - September...  

Broader source: Energy.gov (indexed) [DOE]

Site - September 2004 Independent Oversight Inspection, Nevada Test Site - September 2004 September 2004 Security and Emergency Management Pilot Integrated Performance Tests at the...

311

Inspection Report: IG-0674 | Department of Energy  

Office of Environmental Management (EM)

Inspection Report: IG-0674 February 11, 2005 Unauthorized Handguns on the Nevada Test Site Within the Department of Energy (DOE), the National Nuclear OBJECTIVES Security...

312

Inspection Report: IG-0794 | Department of Energy  

Office of Environmental Management (EM)

794 Inspection Report: IG-0794 May 22, 2008 Office of Science Laboratory Conferences The Department of Energy's Office of Science manages ten major laboratories, comprising one of...

313

Independent Oversight Inspection, Lawrence Livermore National...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

National Laboratory - May 2007 May 2007 Inspection of Environment, Safety, and Health Programs at the Lawrence Livermore National Laboratory This report provides the...

314

Independent Oversight Inspection, Hanford Site - February 2009...  

Office of Environmental Management (EM)

Hanford Site - February 2009 February 2009 Inspection of Environment, Safety and Health Programs at the Hanford Site Waste Treatment and Immobilization Plant This report...

315

Independent Oversight Inspection, Sandia National Laboratories...  

Energy Savers [EERE]

Summary Report - February 2003 February 2003 Inspection of Environment, Safety, and Health and Emergency Management at the Sandia National Laboratories This report provides a...

316

Inspection, Sandia National Laboratories - April 2008 | Department...  

Office of Environmental Management (EM)

National Laboratories - April 2008 April 2008 Inspection of Environment, Safety and Health Programs at the Sandia National Laboratories This report provides the results of an...

317

Electrical Equipment Inventory and Inspection Information  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Electrical Equipment Inventory and Inspection Information APS Non-NRTL Electrical Equipment Inventory Spreadsheet ANL Recognized Reputable Electrical Equipment Manufacturer List as...

318

Inspection Report: IG-0397 | Department of Energy  

Office of Environmental Management (EM)

of the establishment and filling of the Department's Ombudsman position. Inspection Report: IG-0397 More Documents & Publications Audit of Department of Energy International...

319

Inspection Report: IG-0695 | Department of Energy  

Office of Environmental Management (EM)

95 Inspection Report: IG-0695 July 27, 2005 Coordination of Biological Select Agent Activities at Department of Energy Facilities The emerging threat to homeland security posed by...

320

Inspection Report: IG-0633 | Department of Energy  

Office of Environmental Management (EM)

The Security of Uranium Hexafluoride at the East Tennessee Technology Park Not Available for Viewing More Documents & Publications Inspection Report: IG-0633 Semiannual Report to...

Note: This page contains sample records for the topic "inspection maintenance repairs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Criticality Safety Controls Implementation Inspection Criteria...  

Broader source: Energy.gov (indexed) [DOE]

Criticality Safety Controls Implementation Inspection Criteria, Approach, and Lines of Inquiry, October 23, 2009, (HSS CRAD 64-18, Rev 0 ) Criticality Safety Controls...

322

POST-CLOSURE CARE AND INSPECTION PLAN  

Office of Legacy Management (LM)

inspection photographs are posted on Geospatial Environmental Mapping System (GEMS), a Web-based application used to manage and provide agencies and the public with Internet...

323

Independent Oversight Inspection, East Tennessee Technology Park...  

Broader source: Energy.gov (indexed) [DOE]

East Tennessee Technology Park - November 2008 November 2008 Inspection of Environment, Safety, and Health Programs at the East Tennessee Technology Park This report...

324

Independent Oversight Inspection, Thomas Jefferson National Accelerato...  

Broader source: Energy.gov (indexed) [DOE]

Jefferson National Accelerator Facility - August 2008 August 2008 Inspection of Environment, Safety and Health Programs at the Thomas Jefferson National Accelerator Facility...

325

Independent Oversight Inspection, Lawrence Berkeley National...  

Broader source: Energy.gov (indexed) [DOE]

Lawrence Berkeley National Laboratory - April 2009 April 2009 Inspection of Environment, Safety, and Health Programs at the Lawrence Berkeley National Laboratory This...

326

Independent Oversight Inspection, Savannah River Site, Summary...  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Site, Summary Report - February 2004 February 2004 Inspection of Environment, Safety, and Health Management and Emergency Management at the Savannah River Site...

327

Independent Oversight Inspection, Stanford Linear Accelerator...  

Broader source: Energy.gov (indexed) [DOE]

Stanford Linear Accelerator Center - January 2007 January 2007 Inspection of Environment, Safety, and Health Programs at the Stanford Linear Accelerator Center This report...

328

Independent Oversight Inspection, Lawrence Berkeley National Laboratory -  

Broader source: Energy.gov (indexed) [DOE]

Berkeley National Berkeley National Laboratory - April 2009 Independent Oversight Inspection, Lawrence Berkeley National Laboratory - April 2009 April 2009 Inspection of Environment, Safety, and Health Programs at the Lawrence Berkeley National Laboratory The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), inspected environment, safety, and health (ES&H) programs at the DOE Lawrence Berkeley National Laboratory (LBNL) during January through February 2009. The inspection was performed by the Office of Independent Oversight's Office of Environment, Safety and Health Evaluations. The contractor assurance system has been improved and is identifying deficiencies and improving LBNL ES&H processes and performance. LBNL has

329

Independent Oversight Inspection, East Tennessee Technology Park...  

Office of Environmental Management (EM)

East Tennessee Technology Park, Summary Report - May 2003 May 2003 Inspection of Environment, Safety, and Health and Emergency Management at the Oak Ridge Operations Office and...

330

Essential Systems Functionality Inspection Criteria, Approach, and Lines of Inquiry, October 16, 2008 (HSS CRAD 64-11 Rev. 2)  

Broader source: Energy.gov [DOE]

The Essential Systems Functionality (ESF) inspection will evaluate the effectiveness of programs and processes for engineering design and safety basis, construction and installation, configuration management, surveillance testing, maintenance, operations, cognizant system engineer (CSE) and safety system oversight (SSO), and feedback and improvement of selected safety systems. This review will evaluate the effectiveness in maintaining the functionality of these safety systems. The ESF review will be performed in the context of integrated safety management (ISM), although the inspection criteria, activities and lines of inquiry are organized by ESF functional areas rather than ISM principles and core functions.

331

Radioactive Waste Management, Inspection Criteria; Approach,...  

Broader source: Energy.gov (indexed) [DOE]

the guiding principles and core functions of integrated safety management (ISM), conduct of operations, maintenance, engineering, materials handling, occupational safety,...

332

Low Frequency-SAFT Inspection Methodology for Coarse-Grained Steel Rail Components (Manganese Steel Frogs)  

SciTech Connect (OSTI)

In the rail industry, sections of high strength Manganese steel are employed at critical locations in railroad networks. Ultrasonic inspections of Manganese steel microstructures are difficult to inspect with conventional means, as the propagation medium is highly attenuative, coarse-grained, anisotropic and nonhomogeneous in nature. Current in-service inspection methods are ineffective while pre-service X-ray methods (used for full-volumetric examinations of components prior to shipment) are time-consuming, costly, require special facilities and highly trained personnel for safe operations, and preclude manufacturers from inspecting statistically meaningful numbers of frogs for effective quality assurance. In-service examinations consist of visual inspections only and by the time a defect or flaw is visually detected, the structural integrity of the component may already be compromised, and immediate repair or replacement is required. A novel ultrasonic inspection technique utilizing low frequency ultrasound (100 to 500 kHz) combined with a synthetic aperture focusing technique (SAFT) for effective reduction of signal clutter and noise, and extraction of important features in the data, has proven to be effective for these coarse grained steel components. Results from proof-of-principal tests in the laboratory demonstrate an effective means to detect and localize reflectors introduced as a function of size and depth from the top of the frog rail. Using non-optimal, commercially available transducers coupled with the low-frequency/SAFT approach, preliminary evaluations were conducted to study the effects of the material microstructure on ultrasonic propagation, sensitivity and resolution in thick section frog components with machined side-drilled holes. Results from this study will be presented and discussed.

Diaz, Aaron A.; Andersen, Eric S.; Samuel, Todd J.

2004-11-01T23:59:59.000Z

333

The interactive on-site inspection system: An information management system to support arms control inspections  

SciTech Connect (OSTI)

The increasing use of on-site inspection (OSI) to meet the nation`s obligations with recently signed treaties requires the nation to manage a variety of inspection requirements. This document describes a prototype automated system to assist in the preparation and management of these inspections.

DeLand, S.M.; Widney, T.W.; Horak, K.E.; Caudell, R.B.; Grose, E.M.

1996-12-01T23:59:59.000Z

334

Operations & Maintenance Best Practices Guide: Chapter 3  

Broader source: Energy.gov [DOE]

Guide describes chapter 3 of the Operations & Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

335

Chapter 6.14 PROPERTY MAINTENANCE  

E-Print Network [OSTI]

Chapter 6.14 PROPERTY MAINTENANCE Sections: 6.14.010 Findings. 6.14.020 Landscape Maintenance. 6 of landscaping and/or landscape maintenance on private property, including overgrown, dead, or decayed vegetation of the residents of the City of Riverside. (Ord. 6970 § 2, 2007) Section 6.14.020 Landscape maintenance. A

Lyubomirsky, Ilya

336

Module 10: Maintenance and Fueling Guidelines  

Broader source: Energy.gov [DOE]

This course covers safety guidelines for hydrogen, safe maintenance facilities, safety guidelines for hydrogen fueling facilities

337

Stack Characterization System for Inspection of Contaminated Off-Gas Stacks  

Broader source: Energy.gov (indexed) [DOE]

Oak Ridge National Laboratory Tennessee Florida Stack Characterization System for Inspection of Contaminated Off-Gas Stacks Challenge As part of the Oak Ridge National Laboratory (ORNL) Central Campus Closure Project, the Department of Energy (DOE) Environmental Management (EM) Program must demolish the central gaseous waste system and associated facilities including the off-gas stacks and systems. These stacks range from 75 feet to 250 feet tall. Stacks are made of steel reinforced concrete with brick liners or unreinforced radial brick masonry with varying brick sizes and an acid-proof lining. Since being built in the 1950s, the central gaseous waste collection system has received no upgrades and minimal repair with some stacks now unsafe to access even for routine inspection.

338

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2008  

SciTech Connect (OSTI)

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2008 and includes inspection and repair activities completed at the following ten CAUs: #2; CAU 400: Bomblet Pit and Five Points Landfill (TTR) #2; CAU 404: Roller Coaster Lagoons and Trench (TTR) #2; CAU 407: Roller Coaster RadSafe Area (TTR) #2; CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR) #2; CAU 424: Area 3 Landfill Complexes (TTR) #2; CAU 426: Cactus Spring Waste Trenches (TTR) #2; CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR) #2; CAU 453: Area 9 UXO Landfill (TTR) #2; CAU 484: Surface Debris, Waste Sites, and Burn Area (TTR) #2; CAU 487: Thunderwell Site (TTR)

NSTec Environmental Restoration

2009-03-19T23:59:59.000Z

339

CRAD, Maintenance Assessment Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Maintenance Assessment Plan Maintenance Assessment Plan CRAD, Maintenance Assessment Plan Performance Objective: An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations. Criteria: The program, facility or operation has a Maintenance Implementation Plan (MIP), or equivalent document, which defines and documents the approach to conduct of maintenance. The maintenance organization structure is well defined and understood. Responsibilities, organizational interfaces, and administrative activities are adequately defined and implemented to provide timely availability of parts, materials, and services needed to support the

340

Robotic equipment for pipeline repair  

SciTech Connect (OSTI)

Hyperbaric welding provides the most reliable method for connection or repair of subsea oil and gas pipelines. Research on hyperbaric arc welding processes indicates that it should be possible to achieve stable welding conditions with Gas Tungsten Arc (GTA) to approximately 600m, and with Gas Metal Arc (GMA) and Plasma Arc to at least 1,000m. These depths are well beyond the limits of manned saturation diving. At the present time the limitation on the maximum depth to which these processes can be applied, in practice, is the requirement for completely diverless operation deeper than approximately 350m. Fully diverless hyperbaric welding is not presently available to the industry but several diverless pipeline repair systems which utilize mechanical connectors have been developed. This paper reviews the present status of mechanized hyperbaric welding systems currently being used in the North Sea and discusses some of the work being done to achieve fully diverless robotic pipeline repair with both welding and connectors.

Gibson, D.E.; Barratt, K.; Paterson, J. [National Hyperbaric Centre, Aberdeen (United Kingdom)

1995-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "inspection maintenance repairs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Structural and Functional Studies on Nucleotide Excision Repair From Recognition to Incision.  

SciTech Connect (OSTI)

Maintenance of the correct genetic information is crucial for all living organisms because mutations are the primary cause of hereditary diseases, as well as cancer and may also be involved in aging. The importance of genomic integrity is underscored by the fact that 80 to 90% of all human cancers are ultimately due to DNA damage. Among the different repair mechanisms that have evolved to protect the genome, nucleotide excision repair (NER) is a universal pathway found in all organisms. NER removes a wide variety of bulky DNA adducts including the carcinogenic cyclobutane pyrimidine dimers induced by UV radiation, benzo(a)pyrene-guanine adducts caused by smoking and the guanine-cisplatin adducts induced by chemotherapy. The importance of this repair mechanism is reflected by three severe inherited diseases in humans, which are due to defects in NER: xeroderma pigmentosum, Cockayne's syndrome and trichothiodystrophy.

Caroline Kisker

2001-01-01T23:59:59.000Z

342

Above Ground Storage Tank (AST) Inspection Form  

E-Print Network [OSTI]

Above Ground Storage Tank (AST) Inspection Form Petroleum Bulk Storage Form Facility Name: ______________________ Tank No:_______________ Date:_____________ Inspection Parameter Result Comments/Corrective Actions 1. Is there leaking in the interstitial space (not DRY)? YES/NO/NA 2. Tank surface shows signs of leakage? YES/NO/NA 3

Pawlowski, Wojtek

343

Electrical Equipment Inspection Program Electrical Safety  

E-Print Network [OSTI]

Electrical Equipment Inspection Program Electrical Safety SLAC-I-730-0A11A-001-R003 23 March 2005 Document Title: Electrical Equipment Inspection Program Original Publication Date: 19 January 2005 Revised Publication Date: 23 March 2005 (updated 29 November 2010) Department: Electrical Safety Document Number: SLAC

Wechsler, Risa H.

344

Annual radioactive waste tank inspection program: 1995  

SciTech Connect (OSTI)

Aqueous radioactive wastes from Savannah River Site (SRS) separations processes are contained in large underground carbon steel tanks. Inspections made during 1995 to evaluate these vessels and evaluations based on data accrued by inspections performed since the tanks were constructed are the subject of this report

McNatt, F.G. Sr.

1996-04-01T23:59:59.000Z

345

CFE verification: The decision to inspect  

SciTech Connect (OSTI)

Verification of compliance with the provisions of the treaty on Conventional Forces-Europe (CFE) is subject to inspection quotas of various kinds. Thus the decision to carry out a specific inspection or verification activity must be prudently made. This decision process is outlined, and means for conserving quotas'' are suggested. 4 refs., 1 fig.

Allentuck, J.

1990-01-01T23:59:59.000Z

346

Cornell University's Online Aboveground Petroleum Tank Inspection Program  

E-Print Network [OSTI]

Cornell University's Online Aboveground Petroleum Tank Inspection Program How To's What is Cornell University's Online Aboveground Petroleum Tank Inspection Program? Cornell University's Online Aboveground Petroleum Tank Inspection Program enables assigned tank inspectors to record their monthly aboveground tank

Pawlowski, Wojtek

347

POST 10/Truck Inspection Station (Map 3  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

POST 10/Truck Inspection Station (Map 3) POST 10/Truck Inspection Station (Map 3) Changes Effective January 11, 2010 Pajarito Corridor Deliveries: Drivers of commercial delivery trucks headed to the Pajarito Corridor (Pajarito Road bounded by NM Highway 4 and Diamond Drive) must stop at Post 10 for truck inspections. Drivers will then need to present time-stamped inspection passes from Post 10 to protective force officers stationed at the Pajarito Corridor. (Drivers exiting Post 10 should (1) turn right and proceed west on the Truck Route; (2) turn left onto West Jemez Road; (3) proceed to Lane 7; (4) STOP and present the inspection pass to the protective force officer; (5) turn left onto Diamond

348

Security enhanced with increased vehicle inspections  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Security enhanced with increased vehicle inspections Security enhanced with increased vehicle inspections Security measures increase as of March: vehicle inspections won't delay traffic New increased security procedures meet LANL's security objectives while minimizing impacts on local businesses and tourists. March 23, 2012 The most prominent change is the increase of random inspections of all vehicles transiting the Laboratory, to include West and East Jemez Roads and roadways leading to the main Laboratory administrative area, Technical Area 3 Expect random inspections of all vehicles transiting the Laboratory, to include West and East Jemez Roads and roadways leading to the main Laboratory administrative area, Technical Area 3. Contact Kevin Roark Communications Office (505) 665-9202 Email "We're doing our best to meet our security objectives while minimizing

349

Inspection Report: IG-0547 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Inspection Report: IG-0547 Inspection Report: IG-0547 Inspection Report: IG-0547 March 22, 2002 Licensing of Trade Secrets by Sandia National Laboratories The Office of Inspector General (OIG), U.S. Department of Energy (DOE), initiated an inspection into the facts and circumstances surrounding the issuance of a trade secret license in June 2000 by Sandia National Laboratories (Sandia) at Livermore, California, to Axsun Technologies (Axsun), a private company. This inspection was initiated after the OIG received allegations that the issuance of the Axsun license was in violation of both DOE policy and the requirements of Sandia's management and operating contract. It was alleged that Sandia had been advised for many years that DOE policy prohibited the national laboratories from creating, maintaining or marketing trade secrets. The allegation suggested

350

Independent Oversight Inspection, Lawrence Livermore National Laboratory -  

Broader source: Energy.gov (indexed) [DOE]

Lawrence Livermore National Lawrence Livermore National Laboratory - June 2005 Independent Oversight Inspection, Lawrence Livermore National Laboratory - June 2005 June 2005 Inspection of Emergency Management at the Livermore Site Office and Lawrence Livermore National Laboratory The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA), within the Office of Security and Safety Performance Assurance, conducted an inspection of the emergency management program at the U.S. Department of Energy (DOE) Lawrence Livermore National Laboratory (LLNL) site in June 2005. The inspection was performed by the OA Office of Emergency Management Oversight. This 2005 OA inspection determined that LLNL has completed program development work or has established an appropriate framework for nearly all

351

Inspection Report: IG-0531 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Inspection Report: IG-0531 Inspection Report: IG-0531 Inspection Report: IG-0531 November 13, 2001 Inspection of Cyber Security Standards for Sensitive Personal Information The Office of Inspector General (OIG), U.S. Department of Energy (DOE), identified a concern relating to the cyber security of unclassified sensitive personal information maintained by the Department under the Privacy Act of 1974, and other personal information exempt from disclosure under the Freedom of Information Act (Privacy Act/FOIA personal information). Specifically, the concern related to possible compromise of this type of information on or over DOE Headquarters and field site computer networks. Inspection Report: IG-0531 More Documents & Publications Audit Report: IG-0568 Audit Report: IG-0617 Audit Report: IG-0572

352

Inspection/Sampling Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Inspection/Sampling Schedule Inspection/Sampling Schedule Inspection/Sampling Schedule Site Inspection and Water Sampling Schedules Note: The following schedules are subject to change without prior notice and will be updated periodically. Site Name Inspection Date Sampling Week Ambrosia Lake, NM, Disposal Site August 18, 2014 November 20, 2013 Bluewater, NM, Disposal Site August 18, 2014 November 20, 2013 January 28, 2014 May 12, 2014 Boiling Nuclear Superheater (BONUS), PR, Decommissioned Reactor Site Next event 2017 Burrell, PA, Disposal Site December 9, 2013 November 20, 2013 Canonsburg, PA, Disposal Site December 9, 2013 November 19, 2013 Durango, CO, Disposal Site May 19, 2014 June 2, 2014 Durango, CO, Processing Site N/A June 2, 2014 September 1, 2014 Edgemont, SD, Disposal Site June 23, 2014 N/A

353

Licensee contractor and vendor inspection status report  

SciTech Connect (OSTI)

A fundamental premise of the Nuclear Regulatory Commission's (NRC) licensing and inspection program is that licensees are responsible for the proper construction and safe and efficient operation of their nuclear power plants. The total government-industry system for the inspection of commercial nuclear facilities has been designed to provide for multiple levels of inspection and verification. Licensees, contractors, and vendors each participate in a quality verification process in compliance with requirements prescribed by the NRC's rules and regulations (Title 10 Code of Federal Regulations). The NRC performs an overview of the commercial nuclear industry by inspection to determine whether its requirements are being met by licensees and their contractors, while the major inspection effort is performed by the industry within the framework of ongoing quality verification programs.

Not Available

1990-10-01T23:59:59.000Z

354

Flexible ultrasonic pipe inspection apparatus  

DOE Patents [OSTI]

A flexible, modular ultrasonic pipe inspection apparatus, comprising a flexible, hollow shaft that carries a plurality of modules, including at least one rotatable ultrasonic transducer, a motor/gear unit, and a position/signal encoder. The modules are connected by flexible knuckle joints that allow each module of the apparatus to change its relative orientation with respect to a neighboring module, while the shaft protects electrical wiring from kinking or buckling while the apparatus moves around a tight corner. The apparatus is moved through a pipe by any suitable means, including a tether or drawstring attached to the nose or tail, differential hydraulic pressure, or a pipe pig. The rotational speed of the ultrasonic transducer and the forward velocity of the apparatus are coordinated so that the beam sweeps out the entire interior surface of the pipe, enabling the operator to accurately assess the condition of the pipe wall and determine whether or not leak-prone corrosion damage is present.

Jenkins, Charles F. (Aiken, SC); Howard, Boyd D. (Augusta, GA)

1998-01-01T23:59:59.000Z

355

Technological Advances in Pipeline Isolation and Repair  

Science Journals Connector (OSTI)

Pipeline isolation has been practised for many years to implement various repairs. The tools originally applied were simple and...

Dr A. Aldeen

1994-01-01T23:59:59.000Z

356

ANNUAL RADIOACTIVE WASTE TANK INSPECTION PROGRAM 2009  

SciTech Connect (OSTI)

Aqueous radioactive wastes from Savannah River Site (SRS) separations and vitrification processes are contained in large underground carbon steel tanks. Inspections made during 2009 to evaluate these vessels and other waste handling facilities along with evaluations based on data from previous inspections are the subject of this report. The 2009 inspection program revealed that the structural integrity and waste confinement capability of the Savannah River Site waste tanks were maintained. All inspections scheduled per LWO-LWE-2008-00423, HLW Tank Farm Inspection Plan for 2009, were completed. All Ultrasonic measurements (UT) performed in 2009 met the requirements of C-ESG-00006, In-Service Inspection Program for High Level Waste Tanks, Rev. 1, and WSRC-TR-2002-00061, Rev.4. UT inspections were performed on Tank 29 and the findings are documented in SRNL-STI-2009-00559, Tank Inspection NDE Results for Fiscal Year 2009, Waste Tank 29. Post chemical cleaning UT measurements were made in Tank 6 and the results are documented in SRNL-STI-2009-00560, Tank Inspection NDE Results Tank 6, Including Summary of Waste Removal Support Activities in Tanks 5 and 6. A total of 6669 photographs were made and 1276 visual and video inspections were performed during 2009. Twenty-Two new leaksites were identified in 2009. The locations of these leaksites are documented in C-ESR-G-00003, SRS High Level Waste Tank Leaksite Information, Rev.4. Fifteen leaksites at Tank 5 were documented during tank wall/annulus cleaning activities. Five leaksites at Tank 6 were documented during tank wall/annulus cleaning activities. Two new leaksites were identified at Tank 19 during waste removal activities. Previously documented leaksites were reactivated at Tanks 5 and 12 during waste removal activities. Also, a very small amount of additional leakage from a previously identified leaksite at Tank 14 was observed.

West, B.; Waltz, R.

2010-06-21T23:59:59.000Z

357

Washington State Department of Transportation Bridge Maintenance and Inspection Guidance for Protected Terrestrial Species  

E-Print Network [OSTI]

and addressing Migratory Bird Treaty Act issues. Chapter 5the federal Migratory Bird Treaty Act (MBTA) and Washington

Carey, Marion

2007-01-01T23:59:59.000Z

358

Washington State Department of Transportation Bridge Maintenance and Inspection Guidance for Protected Terrestrial Species  

E-Print Network [OSTI]

Migratory Bird Treaty Act (MBTA) and Washington StateCode, Chapter 77.15 RCW. The MBTA is administered by theis more stringent that the MBTA, as it protects empty nests,

Carey, Marion

2007-01-01T23:59:59.000Z

359

Strongly Incremental Repair Detection Julian Hough  

E-Print Network [OSTI]

Strongly Incremental Repair Detection Julian Hough Dialogue Systems Group Faculty of Linguistics.purver@qmul.ac.uk Abstract We present STIR (STrongly Incremen- tal Repair detection), a system that de- tects speech repairs-theoretic measures from n-gram models as its principal decision features in a pipeline of classifiers detecting

Purver, Matthew

360

Feasibility study for a transportation operations system cask maintenance facility  

SciTech Connect (OSTI)

The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the cask systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.

Rennich, M.J.; Medley, L.G.; Attaway, C.R.

1991-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "inspection maintenance repairs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Independent Oversight Inspection, Hanford Site - May 2004 | Department...  

Broader source: Energy.gov (indexed) [DOE]

May 2004 Independent Oversight Inspection, Hanford Site - May 2004 May 2004 Inspection of Emergency Management at the Hanford Site This report provides the results of an...

362

Independent Oversight Inspection, Hanford Site, Vol III - August...  

Broader source: Energy.gov (indexed) [DOE]

Site, Vol III - August 2001 Independent Oversight Inspection, Hanford Site, Vol III - August 2001 August 2001 Inspection of Emergency Management at the Hanford Site This report...

363

Inspection of Emergency Management Programs at the Argonne National...  

Broader source: Energy.gov (indexed) [DOE]

Inspection of Emergency Management Programs at the Argonne National Laboratory - East, Volume II, May 2002 Inspection of Emergency Management Programs at the Argonne National...

364

Natural Gas Vehicle Cylinder Safety, Training and Inspection...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Natural Gas Vehicle Cylinder Safety, Training and Inspection Project Natural Gas Vehicle Cylinder Safety, Training and Inspection Project Presentation from the U.S. DOE Office of...

365

Inspection, Oak Ridge National Laboratory - July 2004 | Department...  

Broader source: Energy.gov (indexed) [DOE]

Oak Ridge National Laboratory - July 2004 Inspection, Oak Ridge National Laboratory - July 2004 July 2004 Inspection of Environment, Safety, and Health Management at the Oak Ridge...

366

ENERGY STAR Certified Homes, Version 3 (Rev. 07) Inspection Checklists...  

Broader source: Energy.gov (indexed) [DOE]

Inspection Checklists for National Program Requirements ENERGY STAR Certified Homes, Version 3 (Rev. 07) Inspection Checklists for National Program Requirements ENERGY STAR...

367

UF{sub 6} cylinder inspections at PGDP  

SciTech Connect (OSTI)

Routine inspections of all UF{sub 6} cylinders at the Paducah Gaseous Diffusion Plant have been mandated by the Department of Energy. A specific UF{sub 6} cylinder inspection procedure for what items to inspect and training for the operators prior to inspection duty are described. The layout of the cylinder yards and the forms used in the inspections are shown. The large number of cylinders (>30,000) to inspect and the schedule for completion on the mandated time table are discussed. Results of the inspections and the actions to correct the deficiencies are explained. Future inspections and movement of cylinders for relocation of certain cylinder yards are defined.

Lamb, G.W.; Whinnery, W.N. [Martin Marietta Energy Systems, Inc., Paducah, KY (United States)

1991-12-31T23:59:59.000Z

368

Inspection Report: DOE/IG-0913 | Department of Energy  

Office of Environmental Management (EM)

Inspection Report: DOEIG-0913 Inspection Report: DOEIG-0913 June 3, 2014 Conference Management at Selected Department Sites In support of its diverse science, energy and national...

369

Independent Oversight Inspection, Nevada Test Site, Summary Report...  

Broader source: Energy.gov (indexed) [DOE]

Summary Report - October 2002 Independent Oversight Inspection, Nevada Test Site, Summary Report - October 2002 October 2002 Inspection of Environment, Safety, and Health and...

370

Independent Oversight Inspection, Nevada Test Site, Volume 2...  

Broader source: Energy.gov (indexed) [DOE]

Volume 2 - September 2004 Independent Oversight Inspection, Nevada Test Site, Volume 2 - September 2004 September 2004 Inspection of Emergency Management at the Nevada Test Site...

371

Inspection of Environment, Safety, and Health Management at the...  

Broader source: Energy.gov (indexed) [DOE]

Inspection of Environment, Safety, and Health Management at the Oak Ridge Operations Office and East Tennessee Technology Park - Volume I, May 2003 Inspection of Environment,...

372

Inspection of Environment, Safety, and Health Management at the...  

Broader source: Energy.gov (indexed) [DOE]

Inspection of Environment, Safety, and Health Management at the Waste Isolation Pilot Plant - Volume I, August 2002 Inspection of Environment, Safety, and Health Management at the...

373

Inspection of Environment, Safety, and Health Management at the...  

Broader source: Energy.gov (indexed) [DOE]

Inspection of Environment, Safety, and Health Management at the Hanford Site, March 2002 Inspection of Environment, Safety, and Health Management at the Hanford Site, March 2002...

374

Inspection of Environment, Safety, and Health Management at the...  

Broader source: Energy.gov (indexed) [DOE]

Inspection of Environment, Safety, and Health Management at the Argonne National Laboratory - East, Volume I, May 2002 Inspection of Environment, Safety, and Health Management at...

375

Inspection of Environment, Safety, and Health and Emergency Management...  

Broader source: Energy.gov (indexed) [DOE]

Inspection of Environment, Safety, and Health and Emergency Management at the Oak Ridge Operations Office and East Tennessee Technology Park, Summary Report, May 2003 Inspection of...

376

Inspection of Environment, Safety, and Health Programs at the...  

Broader source: Energy.gov (indexed) [DOE]

Inspection of Environment, Safety, and Health Programs at the Savannah River Site, February 2006 Inspection of Environment, Safety, and Health Programs at the Savannah River Site,...

377

INSPECTION REPORT: DOE/IG-0919 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

INSPECTION REPORT: DOEIG-0919 INSPECTION REPORT: DOEIG-0919 September 24, 2014 Management of Certain Aspects of the Human Reliability Program and Incident Reporting within the...

378

Protocol, Inspection Criteria - April 23, 2008 | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Criteria - April 23, 2008 April 23, 2008 Inspection Criteria, Activities, and Lines of Inquiry, April 23, 2008 This document provides inspection criteria and lines of...

379

CRAD, Performance-Based Inspection - August 19, 2010 | Department...  

Office of Environmental Management (EM)

Inspection of Environmental Management Systems: Inspection Criteria, Approach, and Lines of Inquiry (HSS CRAD 64-38) This Criteria Review and Approach Document (HSS CRAD...

380

CRAD, Performance-Based Inspection - November 29, 2011 | Department...  

Broader source: Energy.gov (indexed) [DOE]

Inspection of Environmental Management Systems: Inspection Criteria, approach, and Lines of Inquiry (HSS CRAD 45-38, Rev. 1) This Criteria Review and Approach Document (HSS...

Note: This page contains sample records for the topic "inspection maintenance repairs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Independent Oversight Inspection, Y-12 National Security Complex...  

Broader source: Energy.gov (indexed) [DOE]

Inspection, Y-12 National Security Complex - April 2003 April 2003 Inspection of Environment, Safety, and Health Management at the Y-12 National Security Complex This report...

382

Inspection, Los Alamos National Laboratory - January 2008 | Department...  

Broader source: Energy.gov (indexed) [DOE]

Inspection, Los Alamos National Laboratory - January 2008 January 2008 Inspection of Environment, Safety and Health Programs at the Los Alamos National Laboratory This report...

383

NDE 701: Enhanced Resonance Inspection for Light Metal Castings...  

Broader source: Energy.gov (indexed) [DOE]

NDE 701: Enhanced Resonance Inspection for Light Metal Castings NDE 701: Enhanced Resonance Inspection for Light Metal Castings Presentation from the U.S. DOE Office of Vehicle...

384

Drive alignment pays maintenance dividends  

SciTech Connect (OSTI)

Proper alignment of the motor and gear drive on conveying and processing equipment will result in longer bearing and coupling life, along with lower maintenance costs. Selecting an alignment free drive package instead of a traditional foot mounted drive and motor is a major advancement toward these goals. 4 photos.

Fedder, R. [Rexnord Industries, Milwaukee, WI (United States)

2008-12-15T23:59:59.000Z

385

Dynamic Maintenance of Service Orchestrations  

E-Print Network [OSTI]

-Rocquencourt, France Valérie Issarny INRIA Paris-Rocquencourt, France ABSTRACT Service-oriented architectures evolved/orchestration of services. One of the next challenges in this field is the maintenance of service-oriented architectures orchestrations. 1. INTRODUCTION Service Oriented Architecture (SOA) is an architectural style that emerged

Boyer, Edmond

386

2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites  

SciTech Connect (OSTI)

This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) in 2013 at 19 uranium mill tailings disposal sites established under Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978.1 These activities verified that the UMTRCA Title I disposal sites remain in compliance with license requirements. DOE operates 18 UMTRCA Title I sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) in accordance with Title 10 Code of Federal Regulations Part 40.27 (10 CFR 40.27). As required under the general license, a long-term surveillance plan (LTSP) for each site was prepared by DOE and accepted by NRC. The Grand Junction, Colorado, Disposal Site, one of the 19 Title I sites, will not be included under the general license until the open, operating portion of the cell is closed. The open portion will be closed either when it is filled or in 2023. This site is inspected in accordance with an interim LTSP. Long-term surveillance and maintenance services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective actions; and performing administrative, records, stakeholder relations, and other regulatory stewardship functions. Annual site inspections and monitoring are conducted in accordance with site-specific LTSPs and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up or contingency inspections, or corrective action in accordance with the LTSP. LTSPs and site compliance reports are available on the Internet at http://www.lm.doe.gov/.

none,

2014-03-01T23:59:59.000Z

387

ANNUAL RADIOACTIVE WASTE TANK INSPECTION PROGRAM 2010  

SciTech Connect (OSTI)

Aqueous radioactive wastes from Savannah River Site (SRS) separations and vitrification processes are contained in large underground carbon steel tanks. Inspections made during 2010 to evaluate these vessels and other waste handling facilities along with evaluations based on data from previous inspections are the subject of this report. The 2010 inspection program revealed that the structural integrity and waste confinement capability of the Savannah River Site waste tanks were maintained. All inspections scheduled per SRR-LWE-2009-00138, HLW Tank Farm Inspection Plan for 2010, were completed. Ultrasonic measurements (UT) performed in 2010 met the requirements of C-ESG-00006, In-Service Inspection Program for High Level Waste Tanks, Rev. 3, and WSRC-TR-2002-00061, Rev.6. UT inspections were performed on Tanks 30, 31 and 32 and the findings are documented in SRNL-STI-2010-00533, Tank Inspection NDE Results for Fiscal Year 2010, Waste Tanks 30, 31 and 32. A total of 5824 photographs were made and 1087 visual and video inspections were performed during 2010. Ten new leaksites at Tank 5 were identified in 2010. The locations of these leaksites are documented in C-ESR-G-00003, SRS High Level Waste Tank Leaksite Information, Rev.5. Ten leaksites at Tank 5 were documented during tank wall/annulus cleaning activities. None of these new leaksites resulted in a release to the environment. The leaksites were documented during wall cleaning activities and the waste nodules associated with the leaksites were washed away. Previously documented leaksites were reactivated at Tank 12 during waste removal activities.

West, B.; Waltz, R.

2011-06-23T23:59:59.000Z

388

Inspection Report: IG-0628 | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8 8 Inspection Report: IG-0628 December 5, 2003 Internal Controls Over Classified Computers and Classified Removable Media at the Lawrence Livermore National Laboratory Computers are used extensively in the full range of operations at Lawrence Livermore National Laboratory (Livermore), including processing classified national security information. Livermore reported an inventory of 86 classified laptop computers and 1,141 classified desktop computers as of March 2003. In addition, Livermore reported approximately 15,000 pieces of classified removable media. Department of Energy (DOE) policy requires strict inventory controls over classified computers and classified removable media. Inspection Report: IG-0628 More Documents & Publications Inspection Report: IG-0716

389

Inspection Report: IG-0594 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Inspection Report: IG-0594 Inspection Report: IG-0594 Inspection Report: IG-0594 March 31, 2003 Emergency Medical Coordination Memorandum of Agreement at Brookhaven National Laboratory Because of possible exposure to radioactive and hazardous materials and the potential for industrial accidents at Department of Energy (DOE) sites, the Department has established formalized agreements with local emergency medical providers. These arrangements are generally documented through memoranda of agreements (MOAs). These documents detail the mutual understanding between DOE and the offsite emergency medical provider with respect to capabilities, specific support, and procedures for ensuring an integrated and effective response, including specific procedures for receipt of victims of radiation accidents.

390

Independent Oversight Inspection, Portsmouth Gaseous Diffusion Plant -  

Broader source: Energy.gov (indexed) [DOE]

Portsmouth Gaseous Diffusion Portsmouth Gaseous Diffusion Plant - November 2006 Independent Oversight Inspection, Portsmouth Gaseous Diffusion Plant - November 2006 November 2006 Inspection of Emergency Management at the Portsmouth Gaseous Diffusion Plant The Secretary of Energy's Office of Independent Oversight, within the Office of Security and Safety Performance Assurance, conducted an inspection of the emergency management program at the Portsmouth Gaseous Diffusion Plant (PORTS) in August and September 2006. The coordination of emergency plans and procedures among USEC and DOE contractor organizations has successfully integrated the emergency management programs into a single cohesive program for the PORTS site. Other strengths include accurate hazards surveys that identify applicable

391

Reliability-based maintenance evaluations and standard preventive maintenance programs  

SciTech Connect (OSTI)

Due to recent issuance of 10CFR50.65, the U.S. Nuclear Regulatory Commission maintenance rule (Rule), and the [open quotes]Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants[close quotes] prepared by the Nuclear Management and Resources Council, many utilities are undertaking review or evaluation of current preventive maintenance (PM) programs. Although PM optimization and documentation are not specifically required by the Rule, an appropriate and effective PM program (PMP) will be the cornerstone of the successful and cost-effective implementation of the Rule. Currently, a project is being conducted at the Vermont Yankee Nuclear Power Station (VYNPS) in conjunction with Quadrex Energy Services to evaluate, optimize, and document the PMP. The project began in March 1993 and is scheduled for completion in mid-1995. The initial scope for the project is the evaluation of those structures, systems, and components that are within the scope of the Rule. Because of the number of systems to be evaluated ([approximately]50), the desired completion schedule, and cost considerations, a streamlined approach to PM optimization and documentation is being utilized.

Varno, M. (Vermont Yankee Nuclear Power Corp., Vernon, VT (United States)); McKinley, M. (Quadrex Energy Services Corp., Campbell, CA (United States))

1993-01-01T23:59:59.000Z

392

Computerized Maintenance Management Systems | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Program Areas » Operations & Maintenance » Computerized Program Areas » Operations & Maintenance » Computerized Maintenance Management Systems Computerized Maintenance Management Systems October 7, 2013 - 9:35am Addthis Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and maintenance (O&M) programs. The software automates most of the logistical functions performed by O&M staff. Capabilities Typical CMMS functions depend on the complexity of the system chosen. Examples include: Work order generation, prioritization, and tracking by equipment and/or component. Work orders often can be sorted by equipment, date, person responding, etc. Tracking scheduled and unscheduled maintenance activities Storing technical documentation and maintenance procedures by

393

Maintenance cost studies of present aircraft subsystems  

E-Print Network [OSTI]

This report describes two detailed studies of actual maintenance costs for present transport aircraft. The first part describes maintenance costs for jet transport aircraft broken down into subsystem costs according to an ...

Pearlman, Chaim Herman Shalom

1966-01-01T23:59:59.000Z

394

Invertible Program Restructurings for Continuing Modular Maintenance  

E-Print Network [OSTI]

Invertible Program Restructurings for Continuing Modular Maintenance Julien Cohen ASCOLA team (EMN in main- tenance with invertible program transformations. We illustrate this on the typical Expression problems with our approach. Keywords-modular maintenance; restructuring; invertible pro- gram

Paris-Sud XI, Université de

395

Effects of dairy intake on weight maintenance  

E-Print Network [OSTI]

, randomized trial. Weight loss was baseline to 3 months, weight maintenance was 4 to 9 months. Participants were maintained randomly assigned to low dairy ( 3 servings/d) diets for the maintenance phase. Three...

Zemel, Michael B.; Donnelly, Joseph E.; Smith, Bryan K.; Sullivan, Debra K.; Richards, Joanna; Morgan-Hanusa, Danielle; Mayo, Matthew S.; Sun, Xiaocun; Cook-Wiens, Galen; Bailey, Bruce W.; Van Walleghen, Emily L.; Washburn, Richard A.

2008-10-24T23:59:59.000Z

396

CTBT on-site inspections  

SciTech Connect (OSTI)

On-site inspection (OSI) is a critical part of the verification regime for the Comprehensive Nuclear-Test-Ban Treaty (CTBT). The OSI verification regime provides for international inspectors to make a suite of measurements and observations on site at the location of an event of interest. The other critical component of the verification regime is the International Monitoring System (IMS), which is a globally distributed network of monitoring stations. The IMS along with technical monitoring data from CTBT member countries, as appropriate, will be used to trigger an OSI. After the decision is made to carry out an OSI, it is important for the inspectors to deploy to the field site rapidly to be able to detect short-lived phenomena such as the aftershocks that may be observable after an underground nuclear explosion. The inspectors will be on site from weeks to months and will be working with many tens of tons of equipment. Parts of the OSI regime will be tested in a field exercise in the country of Jordan late in 2014. The build-up of the OSI regime has been proceeding steadily since the CTBT was signed in 1996 and is on track to becoming a deterrent to someone considering conducting a nuclear explosion in violation of the Treaty.

Zucca, J. J. [Principal Deputy, Global Security Directorate, Lawrence Livermore National Laboratory, Livermore, California (United States)

2014-05-09T23:59:59.000Z

397

Operations & Maintenance Best Practices Guide: Chapter 9  

Broader source: Energy.gov [DOE]

Guide describes chapter 9 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

398

Operations & Maintenance Best Practices Guide: Front Matter  

Broader source: Energy.gov [DOE]

Guide describes the front matter of the Operations and Maintenance Best Practices: a Guide to Achieving Operational Efficiency.

399

Operations & Maintenance Best Practices Guide: Appendix c  

Broader source: Energy.gov [DOE]

Guide describes Appendix C of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

400

Operations & Maintenance Best Practices Guide: Chapter 7  

Broader source: Energy.gov [DOE]

Guide describes chapter 7 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

Note: This page contains sample records for the topic "inspection maintenance repairs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Operations & Maintenance Best Practices Guide: Chapter 5  

Broader source: Energy.gov [DOE]

Guide describes chapter 5 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

402

Operations & Maintenance Best Practices Guide: Chapter 8  

Broader source: Energy.gov [DOE]

Guide describes chapter 8 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

403

Collector Field Maintenance: Distributed Solar Thermal Systems  

Science Journals Connector (OSTI)

This paper reports on recent operation and maintenance experiences with distributed solar thermal systems. Although some information on system-...

E. C. Boes; E. C. Cameron; E. L. Harley

1986-01-01T23:59:59.000Z

404

Operations & Maintenance Best Practices Guide: Chapter 10  

Broader source: Energy.gov [DOE]

Guide describes chapter 10 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

405

Operations & Maintenance Best Practices Guide: Chapter 6  

Broader source: Energy.gov [DOE]

Guide describes chapter 6 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

406

Operations & Maintenance Best Practices Guide: Appendix a  

Broader source: Energy.gov [DOE]

Guide describes Appendix A of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

407

Independent Oversight Inspection, Hanford Site - September 2006 |  

Broader source: Energy.gov (indexed) [DOE]

Hanford Site - September 2006 Hanford Site - September 2006 Independent Oversight Inspection, Hanford Site - September 2006 September 2006 Inspection of Environment, Safety, and Health and Emergency Management Programs at the Hanford Site Waste Stabilization and Disposition Project The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Security and Safety Performance Assurance, conducted an inspection of environment, safety, and health (ES&H) programs at the DOE Hanford Site Waste Stabilization and Disposition Project (WSD) during August and September 2006. The inspection was performed by Independent Oversight's Office of Environment, Safety and Health Evaluations. EM senior managers demonstrated that they clearly understand their safety management roles and responsibilities, and are engaged in making safety

408

Independent Oversight Inspection, Brookhaven National Laboratory - April  

Broader source: Energy.gov (indexed) [DOE]

Brookhaven National Laboratory - Brookhaven National Laboratory - April 2004 Independent Oversight Inspection, Brookhaven National Laboratory - April 2004 April 2004 Inspection of Emergency Management at the Brookhaven National Laboratory The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA), within the newly created Office of Security and Safety Performance Assurance, conducted an inspection of the emergency management program at the U.S. Department of Energy (DOE) Brookhaven National Laboratory (BNL) in March 2004. The inspection was performed by the OA Office of Emergency Management Oversight. A number of positive attributes were identified during this review. Most significant is the aggressive program for reducing hazardous material inventories, minimizing hazardous waste, and evaluating chemical use to

409

Independent Oversight Inspection, Stanford Linear Accelerator Center -  

Broader source: Energy.gov (indexed) [DOE]

Stanford Linear Accelerator Stanford Linear Accelerator Center - January 2007 Independent Oversight Inspection, Stanford Linear Accelerator Center - January 2007 January 2007 Inspection of Environment, Safety, and Health Programs at the Stanford Linear Accelerator Center The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security, conducted an inspection of environment, safety, and health (ES&H) programs at the DOE Stanford Linear Accelerator Center (SLAC) during October and November 2006. The inspection was performed by Independent Oversight's Office of Environment, Safety and Health Evaluations. Since the 2004 Type A electrical accident, SSO and SLAC have made improvements in many aspects of ES&H programs. However, the deficiencies in

410

Inspection Report: IG-0533 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Inspection Report: IG-0533 Inspection Report: IG-0533 Inspection Report: IG-0533 December 7, 2001 Inspection of the Department of Energy's Automated Export Control System The National Defense Authorization Act for Fiscal Year 2000 (NDAA for FY 2000) contained a provision that not later than March 30 of each year the President will submit to Congress, beginning in the year 2000 and ending in the year 2007, an annual report on the Government's policies and procedures with respect to the export of technologies and technical information with potential military applications to countries and entities of concern. Under the Act's provisions, to assist in this process, annual audits in this area are to be conducted by the Inspectors General of the Departments of Energy, Commerce, Defense, and State. An interagency working

411

Inspection Report: IG-0472 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Inspection Report: IG-0472 Inspection Report: IG-0472 Inspection Report: IG-0472 June 1, 2000 Inspection of Surplus Computer Equipment Management at the Savannah River Site By letter dated November 1, 1999, Senator Strom Thurmond advised the Office of Inspector General of an allegation that computer equipment containing over 40 computer hard drives reportedly containing classified or sensitive information were surplused and sold by the Department's Savannah River Site (SRS). The letter raised the concern that the release of this information might pose a threat to the national security of the United States. The management and operating contractor at SRS, Westinghouse Savannah River Company (Westinghouse), is responsible for the final disposal of surplus equipment, including computer hard drives. The purpose

412

Independent Oversight Inspection, Sandia National Laboratories, Summary  

Broader source: Energy.gov (indexed) [DOE]

Laboratories, Laboratories, Summary Report - February 2003 Independent Oversight Inspection, Sandia National Laboratories, Summary Report - February 2003 February 2003 Inspection of Environment, Safety, and Health and Emergency Management at the Sandia National Laboratories The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) and emergency management programs at the U.S. Department of Energy's (DOE) Sandia National Laboratories - New Mexico (SNL/NM) site in January-February 2003. The inspection was performed as a joint effort by the OA Office of Environment, Safety and Health Evaluations and the Office of Emergency Management Oversight. As discussed throughout this report, the SNL/NM ISM program has improved,

413

Independent Oversight Inspection, Sandia National Laboratories, Summary  

Broader source: Energy.gov (indexed) [DOE]

Sandia National Laboratories, Sandia National Laboratories, Summary Report - February 2003 Independent Oversight Inspection, Sandia National Laboratories, Summary Report - February 2003 February 2003 Inspection of Environment, Safety, and Health and Emergency Management at the Sandia National Laboratories The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) and emergency management programs at the U.S. Department of Energy's (DOE) Sandia National Laboratories - New Mexico (SNL/NM) site in January-February 2003. The inspection was performed as a joint effort by the OA Office of Environment, Safety and Health Evaluations and the Office of Emergency Management Oversight. As discussed throughout this report, the SNL/NM ISM program has improved,

414

Independent Oversight Inspection, Thomas Jefferson National Accelerator  

Broader source: Energy.gov (indexed) [DOE]

Thomas Jefferson National Thomas Jefferson National Accelerator Facility - August 2008 Independent Oversight Inspection, Thomas Jefferson National Accelerator Facility - August 2008 August 2008 Inspection of Environment, Safety and Health Programs at the Thomas Jefferson National Accelerator Facility The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), inspected environment, safety, and health (ES&H) programs at the DOE Thomas Jefferson Site Office (TJSO) and the Thomas Jefferson National Accelerator Facility (TJNAF) during May through July 2008. The ES&H inspection was performed by Independent Oversight's Office of Environment, Safety and Health Evaluations. In coordination with TJSO, TJNAF has taken a number of actions to develop a

415

Automated visual inspection of rolled metal surfaces  

Science Journals Connector (OSTI)

A prototype for an automated visual on-line metal strip inspection system is described. The system is capable of both detecting and classifying surface defects in copper alloy strips, and it has been installed...

Timo Piironen; Olli Silven; Matti Pietikäinen…

1990-01-01T23:59:59.000Z

416

Hazardous Waste Management Implementation Inspection Criteria...  

Broader source: Energy.gov (indexed) [DOE]

enhance our program. Therefore, we have revised our Inspection Criteria, Approach, and Lines of Inquiry for internal use and also we are making them available for use by DOE line...

417

Distributed PV Permitting and Inspection Processes  

Broader source: Energy.gov [DOE]

This presentation summarizes case studies of the time and cost involved in the distributed PV permitting and inspection process in three Solar America Cities, Austin, Portland, and Salt Lake City.

418

Independent Oversight Inspection, Savannah River Site, Summary Report- February 2004  

Broader source: Energy.gov [DOE]

Inspection of Environment, Safety, and Health Management and Emergency Management at the Savannah River Site

419

Independent Oversight Inspection, Lawrence Livermore National Laboratory- June 2005  

Broader source: Energy.gov [DOE]

Inspection of Emergency Management at the Livermore Site Office and Lawrence Livermore National Laboratory

420

Independent Oversight Inspection, Lawrence Livermore National Laboratory- May 2007  

Broader source: Energy.gov [DOE]

Inspection of Environment, Safety, and Health Programs at the Lawrence Livermore National Laboratory

Note: This page contains sample records for the topic "inspection maintenance repairs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Independent Oversight Inspection, Lawrence Livermore National Laboratory- February 2009  

Broader source: Energy.gov [DOE]

Inspection of Emergency Management at the Livermore Site Office and Lawrence Livermore National Laboratory

422

Independent Oversight Inspection, Pacific Northwest National Laboratory- December 2003  

Broader source: Energy.gov [DOE]

Inspection of Environment, Safety, and Health Management at the Pacific Northwest National Laboratory

423

Independent Oversight Inspection, Savannah River Site- December 2009  

Broader source: Energy.gov [DOE]

Inspection of Reinforced Concrete Construction at the Savannah River Site Mixed Oxide Fuel Fabrication Facility

424

Independent Oversight Inspection, Idaho National Laboratory- August 2007  

Broader source: Energy.gov [DOE]

Inspection of Environment, Safety, and Health Programs at the Idaho National Laboratory's Materials and Fuels Complex

425

Independent Oversight Inspection, Idaho National Laboratory- June 2005  

Broader source: Energy.gov [DOE]

Inspection of Environment, Safety, and Health Programs at the Idaho National Laboratory Advanced Test Reactor

426

Independent Oversight Inspection, Thomas Jefferson National Accelerator Facility- August 2008  

Broader source: Energy.gov [DOE]

Inspection of Environment, Safety and Health Programs at the Thomas Jefferson National Accelerator Facility

427

Categorical Exclusion for Maintenance Work  

Broader source: Energy.gov (indexed) [DOE]

Maintenance Work Maintenance Work along the Electrical District 5 to Saguaro segment (41/4 to 58/5) of the Maricopa-Saguaro 115-kV Transmission Line, between Friendly Comers and Marana, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western plans to conduct maintenance work to maintain or improve the reliability and safety of electrical transmission along 17 miles of the Test Track (formerly Maricopa)-Saguaro 115-kV Transmission Line between Electrical District 5 and Saguaro Steam Plant Substations. The work includes replacing wood poles, cross arms, and knee braces in-kind at 27 structures (41/4-8, 4214, 43/6, 4417, 45/4,46/6,47/2,49/2,49/6,50/2,50/6,50/8,51/4, 52/3, 54/3, 5517, 56/1 57/1-3, 57/8 & 58/2-3), because the wood poles failed stability tests, cross arms are beyond

428

Feature selection for automatic solder joint inspection  

E-Print Network [OSTI]

FEATURE SELECTION FOR AUTOMATIC SOLDER JOINT INSPECTION A Thesis CHENG-CHENG LEE Submitted to the Graduate College of Texas AiVM University in partial fulfillment of the requirement for the degree of MASTER OF SCIENCE August 1987 Major... Subject: Mechanical Engineering FEATURE SELECTION FOR AUTOMATIC SOLDER JOINT INSPECTION A Thesis by CHENG-CHENG LEE Approved as to style and content by: Morris Driels (Chairman of Committee) Norman Gris ld (Member) i(?? Oren Xlasor'i (kfembef...

Lee, Cheng-Cheng

2012-06-07T23:59:59.000Z

429

Influence of old rectangular repair patches on the burst pressure of a gas pipeline  

Science Journals Connector (OSTI)

Seven full scale hydrostatic burst tests were carried out on pipes extracted from an API 5LX52 gas pipeline that contained rectangular and elliptical fillet welded patches and other repairs of different geometries. All breaks took place after widespread yielding. This analysis shows that the patches that generate greater risks are those that: (1) were attached to the pipeline at very low pressure, (2) were placed to repair large defects, (3) are rectangular, long in the direction of the pipe, and narrow, (4) the quality of the weld is doubtful. Based on data reported by In Line Inspection (ILI), of the four conditions mentioned above, only the third can be assessed in order to quantify risks and to schedule replacements.

Pablo Gabriel Fazzini; José Luis Otegui

2006-01-01T23:59:59.000Z

430

International Nuclear Safeguards Inspection Support Tool  

SciTech Connect (OSTI)

The US Department of Energy (DOE) is committed to developing technologies to meet escalating requirements for the International Atomic Energy Agency (IAEA) Non-Proliferation Treaty (NPT) monitoring and associated inspections. This commitment involves the customization and transfer of existing remote monitoring/information management technologies for use by the IAEA. This paper describes an information management system called INSIST International Nuclear Safeguards Inspection Support Tool, which was developed by the Pacific Northwest Laboratory (PNL) to support the IAEA Action Team in its role of monitoring and verifying compliance under United Nations Special Commission (UNSC) Resolutions 687, 707, and 715. Initial emphasis was placed on developing and deploying functionality and databases customized to support the Action Team. Throughout the design and customization of INSIST, emphasis was placed on information storage and retrieval capabilities for data gathered by the Action Team. In addition, PNL provided the Action Team with maps and satellite images and other relevant Iraqi databases to further facilitate the following activities: monitoring nuclear activities, facility operations, and nuclear material inventories assisting in inspection planning and training providing post inspection analysis providing onsite inspection support reporting on inspection findings.

Steinmaus, K.L.; Wukelic, G.E.; Beal, O.M.

1994-03-01T23:59:59.000Z

431

Alternative Fuels Data Center: Natural Gas Vehicle (NGV) Inspection  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Vehicle Vehicle (NGV) Inspection Requirements to someone by E-mail Share Alternative Fuels Data Center: Natural Gas Vehicle (NGV) Inspection Requirements on Facebook Tweet about Alternative Fuels Data Center: Natural Gas Vehicle (NGV) Inspection Requirements on Twitter Bookmark Alternative Fuels Data Center: Natural Gas Vehicle (NGV) Inspection Requirements on Google Bookmark Alternative Fuels Data Center: Natural Gas Vehicle (NGV) Inspection Requirements on Delicious Rank Alternative Fuels Data Center: Natural Gas Vehicle (NGV) Inspection Requirements on Digg Find More places to share Alternative Fuels Data Center: Natural Gas Vehicle (NGV) Inspection Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

432

Intelligent pig inspection, evaluation and remediation of uncoated seamless pipelines  

SciTech Connect (OSTI)

Many gas pipelines in operation in the US today were constructed prior to coating and cathodic protection (CP) current practices. A number of these vintage pipelines had no coating and had CP installed long after their construction thus allowing initial corrosion growths. With continual public and industrial growth and development on and around these pipelines, plus normal maintenance, there is a need to conduct periodic integrity assessments to insure public safety and maintain pipeline efficiency. One of the best tools currently available to measure or gauge pipeline integrity is the intelligent or smart pig. While there are various technologies offered by In-line inspection (ILI) vendors, magnetic flux leakage (MFL) is the one most commonly utilized for in-line inspections of natural gas pipelines. Over the years there has been much speculation over the ability of an MFL tool to clearly define corrosion magnitudes on uncoated pipelines because the MFL signals are distorted by the external corrosion crust or growth. In addition, many of the uncoated lines constructed utilized seamless pipe which compounds the problem with uneven wall thickness common with seamless pipe. Also, the irregular internal surfaces produce additional distortions or noise in the MFL signal. Analysis of the smart pig results are quite difficult when evaluating an uncoated seamless pipeline. However, with the latest advances in MFL smart pigs it is possible to accurately analyze corrosion on uncoated seamless steel pipelines. The ability to accurately identify corrosion on such structures provides the mechanism to evaluate the pipeline's integrity with analytical tools such as RSTRENG, (remaining strength). From that a successful remediation program can be developed which will save the pipeline operator millions of dollars when compared to the expensive alternative of replacing the pipeline.

Shamblin, T.R.

1999-07-01T23:59:59.000Z

433

Building Energy Software Tools Directory: Maintenance Edge  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Maintenance Edge Maintenance Edge Maintenance Edge logo Maintenance Edge is a suite of online Software as a Service (SaaS) facility management tools that gives control and management over buildings without a capital investment. Maintenance Edge enables you to combine work order, planned maintenance, work order wireless, and critical alarms with the option of adding inventory. Fully implemented, Maintenance Edge will cut labor time, increase energy efficiencies, save on capital expenditures, and save on budget and management time. Features include: easy/user-friendly work order requesting, unlimited users, seven different user roles (limits data users can see), no capital or hardware costs required, access to data anywhere anytime, easy-to-click reporting on all the data in your system,

434

Sleeve installations speed pipeline defect repair  

SciTech Connect (OSTI)

Repairing defects in pipelines can be a major challenge for pipeline companies or contractors. To reduce cost and eliminate unscheduled shut downs, pipeline operating companies have adopted ``in-service`` repair methods to restore overall integrity of the pipeline without taking it out of service. Interprovincial Pipe Line Co. has undertaken an aggressive approach to this ``in-service`` repair method by using a developed sleeving system for repairing leaking and non-leaking defects. A structural reinforcement sleeve consists of two non-fillet welded collars (one on each side of the defect) and a full encirclement sleeve welded on top of these collars. The annular space between the pipe and sleeve is filled with a hardenable, non-shrinking epoxy. Three different pressure vessel sleeves can be used for repairing certain defects. They can be used in combination with the pre-stressed sleeve or for independent repairs. This paper reviews the performance and installation of these sleeves.

Friedrich, J.; Smith, J.

1995-12-01T23:59:59.000Z

435

Single molecule studies of DNA mismatch repair  

Science Journals Connector (OSTI)

Abstract DNA mismatch repair, which involves is a widely conserved set of proteins, is essential to limit genetic drift in all organisms. The same system of proteins plays key roles in many cancer related cellular transactions in humans. Although the basic process has been reconstituted in vitro using purified components, many fundamental aspects of DNA mismatch repair remain hidden due in part to the complexity and transient nature of the interactions between the mismatch repair proteins and DNA substrates. Single molecule methods offer the capability to uncover these transient but complex interactions and allow novel insights into mechanisms that underlie DNA mismatch repair. In this review, we discuss applications of single molecule methodology including electron microscopy, atomic force microscopy, particle tracking, FRET, and optical trapping to studies of DNA mismatch repair. These studies have led to formulation of mechanistic models of how proteins identify single base mismatches in the vast background of matched DNA and signal for their repair.

Dorothy A. Erie; Keith R. Weninger

2014-01-01T23:59:59.000Z

436

Week ending: Weekly Specific Maintenance and Repair WO# sub step WO Description Crew/Craft  

E-Print Network [OSTI]

-64Progressing 4/18/2012 0 4 518 0Totals for: 12-013597 12950%% Comp - 12-032564 000 EAST SIDE SUBSTATION, REPLACE SUBSTATION. THIS WORK ORDER IS FOR SERVICE LABOR, SERVICE MATERIAL, AND 0 1 0 UEM - MatlA841104000 CONTR 1 208 EAST SIDE SUBSTATION, REPLACE SUBSTATION. THIS WORK ORDER IS FOR SERVICE LABOProgressing 12

Massachusetts at Amherst, University of

437

E-Print Network 3.0 - aircraft maintenance repair Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Soviet Source: Fuerschbach, Phillip - Joining and Coating Department, Materials and Process Sciences Center, Sandia National Laboratories Collection: Materials Science 100...

438

Group Maintenance Scheduling: A Case Study for a Pipeline Network  

Science Journals Connector (OSTI)

The 2,526 records of pipeline repair corresponded to five different pipe materials, which ... was conducted to analyze the relationships between the repair cost and materials as well as repair cost and diameter. ...

F. Li; L. Ma; Y. Sun; J. Mathew

2014-01-01T23:59:59.000Z

439

Waste Calcining Facility remote inspection report  

SciTech Connect (OSTI)

The purpose of the Waste Calcining Facility (WCF) remote inspections was to evaluate areas in the facility which are difficult to access due to high radiation fields. The areas inspected were the ventilation exhaust duct, waste hold cell, adsorber manifold cell, off-gas cell, calciner cell and calciner vessel. The WCF solidified acidic, high-level mixed waste generated during nuclear fuel reprocessing. Solidification was accomplished through high temperature oxidation and evaporation. Since its shutdown in 1981, the WCFs vessels, piping systems, pumps, off-gas blowers and process cells have remained contaminated. Access to the below-grade areas is limited due to contamination and high radiation fields. Each inspection technique was tested with a mock-up in a radiologically clean area before the equipment was taken to the WCF for the actual inspection. During the inspections, essential information was obtained regarding the cleanliness, structural integrity, in-leakage of ground water, indications of process leaks, indications of corrosion, radiation levels and the general condition of the cells and equipment. In general, the cells contain a great deal of dust and debris, as well as hand tools, piping and miscellaneous equipment. Although the building appears to be structurally sound, the paint is peeling to some degree in all of the cells. Cracking and spalling of the concrete walls is evident in every cell, although the east wall of the off-gas cell is the worst. The results of the completed inspections and lessons learned will be used to plan future activities for stabilization and deactivation of the facility. Remote clean-up of loose piping, hand tools, and miscellaneous debris can start immediately while information from the inspections is factored into the conceptual design for deactivating the facility.

Patterson, M.W.; Ison, W.M.

1994-08-01T23:59:59.000Z

440

Repair Geometric Model by the Healing Method  

Science Journals Connector (OSTI)

Repairing the panel CAD geometric model is an ... and analyzed by NURBS technology. Through the pipeline method determines the matching-curves border fast...

Di Chi; Wang Weibo; Wen Lishu; Liu Zhaozheng

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "inspection maintenance repairs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Tests validate pipeline sleeve repair technique  

SciTech Connect (OSTI)

The sleeve-on-sleeve pipeline-repair technique is a viable, acceptable means of repairing sleeves and preventing fluid leakage resulting from fracture of cracked fillet welds at the ends of an existing single-layer sleeve. This technique was conceived by Interprovincial Pipe Line Co. as a means of repair for situations in which one or both of the circumferential fillet welds at the ends of an initial repair sleeve may need to be reinforced. It was necessary to determine whether this technique can be employed without serious impairment of the integrity of the pipelines on which it is to be used.

Kiefner, J.F.; Maxey, W.A. (Battelle Memorial Inst., Columbus, OH (USA))

1989-08-28T23:59:59.000Z

442

Crews repair transmission lines after Washington wildfire  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Privacy Publications Tribal Affairs Newsroom Search News Articles... Search Crews repair transmission lines after Washington wildfire 662014 12:00 AM Tweet Page Content BPA...

443

2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites  

SciTech Connect (OSTI)

This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management in 2013 at six uranium mill tailings disposal sites reclaimed under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. These activities verified that the UMTRCA Title II disposal sites remain in compliance with license requirements. DOE manages six UMTRCA Title II disposal sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) established at Title 10 Code of Federal Regulations Part 40.28. Reclamation and site transition activities continue at other sites, and DOE ultimately expects to manage approximately 27 Title II disposal sites. Long-term surveillance and maintenance activities and services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective action; and performing administrative, records, stakeholder services, and other regulatory functions. Annual site inspections and monitoring are conducted in accordance with site-specific long-term surveillance plans (LTSPs) and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up inspections, or corrective action. LTSPs and site compliance reports are available online at http://www.lm.doe.gov

none,

2013-11-01T23:59:59.000Z

444

Remote inspection system for hazardous sites  

SciTech Connect (OSTI)

Long term storage of special nuclear materials poses a number of problems. One of these is a need to inspect the items being stored from time to time. Yet the environment is hostile to man, with significant radiation exposure resulting from prolonged presence in the storage facility. This paper describes research to provide a remote inspection capability, which could lead to eliminating the need for humans to enter a nuclear storage facility. While there are many ways in which an RI system might be created, this paper describes the development of a prototype remote inspection system, which utilizes virtual reality technology along with robotics. The purpose of this system is to allow the operator to establish a safe and realistic telepresence in a remote environment. In addition, it was desired that the user interface for the system be as intuitive to use as possible, thus eliminating the need for extensive training. The goal of this system is to provide a robotic platform with two cameras, which are capable of providing accurate and reliable stereographic images of the remote environment. One application for the system is that it might be driven down the corridors of a nuclear storage facility and utilized to inspect the drums inside, all without the need for physical human presence. Thus, it is not a true virtual reality system providing simulated graphics, but rather an augmented reality system, which performs remote inspection of an existing, real environment.

Redd, J.; Borst, C.; Volz, R.A.; Everett, L.J. [Texas A and M Univ., College Station, TX (United States). Computer Science Dept.] [Texas A and M Univ., College Station, TX (United States). Computer Science Dept.

1999-04-01T23:59:59.000Z

445

Feasibility of Magnetostrictive Sensor Inspection of Containments  

SciTech Connect (OSTI)

This report describes the results of a study on the feasibility of using guided waves for long-range global inspection of containment metallic pressure boundaries (i.e., steel containments and liners of reinforced concrete containments) in nuclear power plants. Of particular concern in this study was the potential of the guided-wave approach for remotely inspecting the regions that are inaccessible; for example, regions where the metallic pressure boundary is backed by concrete on one or both sides. The study includes a literature review on long-range guided-wave inspection techniques, a modeling study of the behavior of guided waves in plates with different boundary conditions (e.g., freestanding and backed by concrete on one or both sides), and an experimental investigation of the feasibility of a guided-wave technique called ''magnetostrictive sensor (MsS)'' for (1) generating and detecting guided waves in plates and (2) detecting a defect over a long range. Results of the study showed (1) that it is feasible to achieve long-range global inspection of plates, including regions that are inaccessible, using low-frequency guided waves and (2) that the MsS technique is well suited for this application. Recommendations are made to further test and develop the MsS technique for practical implementation for containment inspection in nuclear power plants.

Kwun, H.

1999-03-01T23:59:59.000Z

446

Alternative Fuels Data Center: Low-Speed Vehicle Inspection Exemption  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Low-Speed Vehicle Low-Speed Vehicle Inspection Exemption to someone by E-mail Share Alternative Fuels Data Center: Low-Speed Vehicle Inspection Exemption on Facebook Tweet about Alternative Fuels Data Center: Low-Speed Vehicle Inspection Exemption on Twitter Bookmark Alternative Fuels Data Center: Low-Speed Vehicle Inspection Exemption on Google Bookmark Alternative Fuels Data Center: Low-Speed Vehicle Inspection Exemption on Delicious Rank Alternative Fuels Data Center: Low-Speed Vehicle Inspection Exemption on Digg Find More places to share Alternative Fuels Data Center: Low-Speed Vehicle Inspection Exemption on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Low-Speed Vehicle Inspection Exemption Low-speed vehicles are exempt from annual state vehicle inspections.

447

Alternative Fuels Data Center: Alternative Fuel Vehicle Inspection and  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Inspection and Permit to someone by E-mail Inspection and Permit to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle Inspection and Permit on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle Inspection and Permit on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle Inspection and Permit on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle Inspection and Permit on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle Inspection and Permit on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle Inspection and Permit on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel Vehicle Inspection and Permit

448

TMI-2 (Three-Mile Island-Unit 2) rail cask and railcar maintenance  

SciTech Connect (OSTI)

This paper describes the NuPac 125-B cask system (i.e., cask and railcar), and the maintenance and inspection requirements for that system. The paper discusses the operations being done to satisfy those requirements and how, in some cases, it has been efficient for the operations to be more rigorous than the requirements. Finally, this paper discusses the experiences gained from those operations and how specific hardware and procedural enhancements have resulted in a reliable and continuous shipping campaign. 2 refs., 2 figs.

Tyacke, M.J.; Ayers, A.L., Jr.; Ball, L.J.; Anselmo, A.A.

1988-02-01T23:59:59.000Z

449

DESIGN, CONSTRUCTION AND FIELD DEMONSTRATION OF EXPLORER: A LONG-RANGE UNTETHERED LIVE GASLINE INSPECTION ROBOT SYSTEM  

SciTech Connect (OSTI)

This program is undertaken in order to construct and field-demonstrate EXPLORER, a modular, remotely controllable, self-powered, untethered robot system for the inspection of live gas distribution 150 mm (6-inch) to 200 mm (8-inch) diameter mains. The modular design of the system allows it to accommodate various components intended to accomplish different inspection, repair, sample retrieval, and other in-pipe tasks. The prototype system being built under this project will include all the basic modules needed, i.e. the locomotor, power storage, wireless communication, and camera. The camera, a solid-state fisheye-type, is used to transmit real-time video to the operator that allows for the live inspection of gas distribution pipes. The system under development significantly advances the state of the art in inspection systems for gas distribution mains, which presently consist of tethered systems of limited range (about 500 ft form the point of launch) and limited inspection views. Also current inspection systems have no ability to incorporate additional modules to expand their functionality. This development program is a joint effort among the Northeast Gas Association (formerly New York Gas Group), the Jet Propulsion Laboratory (JPL), the Johnson Space Center (JSC), Carnegie Mellon University's (CMU) National Robotics Engineering Consortium (NREC), and the US Department of Energy (DOE) through the National Energy Technology Laboratory (NETL) The present report summarizes the accomplishments of the project during its fifth six-month period. The project has in general achieved its goals for this period as outlined in the report. The prototype robot is undergoing extensive endurance testing in order to prepare for the field demonstrations planned for June 2004.

George C. Vradis, Hagen Schempf

2004-04-01T23:59:59.000Z

450

WHERE MULTIFUNCTIONAL DNA REPAIR PROTEINS MEET: MAPPING THE INTERACTION DOMAINS BETWEEN XPG AND WRN  

SciTech Connect (OSTI)

The rapid recognition and repair of DNA damage is essential for the maintenance of genomic integrity and cellular survival. Multiple complex and interconnected DNA damage responses exist within cells to preserve the human genome, and these repair pathways are carried out by a specifi c interplay of protein-protein interactions. Thus a failure in the coordination of these processes, perhaps brought about by a breakdown in any one multifunctional repair protein, can lead to genomic instability, developmental and immunological abnormalities, cancer and premature aging. This study demonstrates a novel interaction between two such repair proteins, Xeroderma pigmentosum group G protein (XPG) and Werner syndrome helicase (WRN), that are both highly pleiotropic and associated with inherited genetic disorders when mutated. XPG is a structure-specifi c endonuclease required for the repair of UV-damaged DNA by nucleotide excision repair (NER), and mutations in XPG result in the diseases Xeroderma pigmentosum (XP) and Cockayne syndrome (CS). A loss of XPG incision activity results in XP, whereas a loss of non-enzymatic function(s) of XPG causes CS. WRN is a multifunctional protein involved in double-strand break repair (DSBR), and consists of 3’–5’ DNA-dependent helicase, 3’–5’ exonuclease, and single-strand DNA annealing activities. Nonfunctional WRN protein leads to Werner syndrome, a premature aging disorder with increased cancer incidence. Far Western analysis was used to map the interacting domains between XPG and WRN by denaturing gel electrophoresis, which separated purifi ed full length and recombinant XPG and WRN deletion constructs, based primarily upon the length of each polypeptide. Specifi c interacting domains were visualized when probed with the secondary protein of interest which was then detected by traditional Western analysis using the antibody of the secondary protein. The interaction between XPG and WRN was mapped to the C-terminal region of XPG as well as the C-terminal region of WRN. The physical interaction between XPG and WRN links NER, (made evident by the disease XP) with DSBR, which imparts additional knowledge of the overlapping nature of these two proteins and the previously distinct DNA repair pathways they are associated with. Since genomic integrity is constantly threatened by both endogenous and exogenous (internal and external) damage, understanding the roles of these proteins in coordinating DNA repair processes with replication will signifi cantly further understanding how defects instigate physiological consequences in response to various DNA damaging sources. This ultimately contributes to our understanding of cancer and premature aging.

Rangaraj, K.; Cooper, P.K.; Trego, K.S.

2009-01-01T23:59:59.000Z

451

Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3  

SciTech Connect (OSTI)

The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

Leigh, Richard J.

2012-09-01T23:59:59.000Z

452

Inspection Report: IG-0480 | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0 0 Inspection Report: IG-0480 September 1, 2000 Inspection of Gain Sharing Opportunities for the Department of Energy In 1995, the General Services Administration provided guidance on a program known as "GAIN SHARING" where agencies could give cash awards to employees who participate in programs to save travel dollars. This guidance discussed the authority to offer cash awards to employees for obtaining a free coach class ticket with Frequent Flyer benefits earned on official travel and for incurring lodging expenses at a daily rate less than the maximum lodging rate. This inspection was initiated to determine if the Department of Energy (DOE) had developed any initiatives to implement General Services Administration guidance on "GAIN SHARING."

453

Inspection Report: IG-0547 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7 7 Inspection Report: IG-0547 March 22, 2002 Licensing of Trade Secrets by Sandia National Laboratories The Office of Inspector General (OIG), U.S. Department of Energy (DOE), initiated an inspection into the facts and circumstances surrounding the issuance of a trade secret license in June 2000 by Sandia National Laboratories (Sandia) at Livermore, California, to Axsun Technologies (Axsun), a private company. This inspection was initiated after the OIG received allegations that the issuance of the Axsun license was in violation of both DOE policy and the requirements of Sandia's management and operating contract. It was alleged that Sandia had been advised for many years that DOE policy prohibited the national laboratories from creating, maintaining or marketing trade secrets. The allegation suggested

454

Inspection Report: IG-0597 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7 7 Inspection Report: IG-0597 April 24, 2003 Inspection of Internal Controls Over Personal Computers at Los Alamos National Laboratory Computers are used extensively in the full range of operations at the Los Alamos National Laboratory (LANL), including processing classified national security information. LANL reported an inventory of approximately 5,000 laptop and 30,000 desktop computers at the end of Fiscal Year (FY) 2002. Department of Energy (DOE) and LANL property policies identify computers as "sensitive property," due in part to their susceptibility to theft and potential for conversion to cash. It is an expected practice that management controls over computers throughout the DOE complex remain robust and consistent. Inspection Report: IG-0597

455

Inspection Report: IG-0778 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8 8 Inspection Report: IG-0778 October 2, 2007 Inspection Report on The Consolidated Terrorism Watchlist Nomination Process at the Department of Energy The Government-wide effort to place known or suspected terrorists on a national watchlist is a key weapon in the global war on terrorism. Accurate watchlists provide an import tool for national defense and border protection operations. They allow law enforcement and intelligence personnel to screen and monitor suspected terrorist travel, reducing the likelihood that terrorists may travel undetected to or within the United States. Inspection Report: IG-0778 More Documents & Publications Semiannual Report to Congress: October 1, 2007 - March 31, 2008 Intelligence Reform and Terroroism Prevention Act - December 17, 2004

456

Inspection Report: IG-0741 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Inspection Report: IG-0741 Inspection Report: IG-0741 Inspection Report: IG-0741 October 10, 2006 Concerns With Security Barriers at theY-12 National Security Complex The DOE Office of Inspector General received an allegation that newly constructed concrete security barriers at the Y-12 site were inadequate because the design of the weapon ports did not take into consideration the space required for the weapons' sight system. Specifically, the complaint alleged that weapon port openings were not designed to accommodate the sight system of protective force weapons, limiting the ability of security police officers to maneuver their weapons when firing through the ports. Construction of the security barriers was one of three security upgrades under the "West Fort" project designation. The objective of this

457

Vicinal light inspection of translucent materials  

DOE Patents [OSTI]

The present invention includes methods and apparatus for inspecting vicinally illuminated non-patterned areas of translucent materials. An initial image of the material is received. A second image is received following a relative translation between the material being inspected and a device generating the images. Each vicinally illuminated image includes a portion having optimal illumination, that can be extracted and stored in a composite image of the non-patterned area. The composite image includes aligned portions of the extracted image portions, and provides a composite having optimal illumination over a non-patterned area of the material to be inspected. The composite image can be processed by enhancement and object detection algorithms, to determine the presence of, and characterize any inhomogeneities present in the material.

Burns, Geroge R. (Albuquerque, NM); Yang, Pin (Albuquerque, NM)

2010-01-19T23:59:59.000Z

458

An intelligent inspection and survey robot  

SciTech Connect (OSTI)

Large quantities of mixed and low-level radioactive waste contained in 55-, 85-, and 110-gallon steel drums are stored at Department of Energy (DOE) warehouses located throughout the United States. The steel drums are placed on pallets and stacked on top of one another, forming a column of drums ranging in heights of one to four drums and up to 16 feet high. The columns of drums are aligned in rows forming an aisle approximately three feet wide between the rows of drums. Tens of thousands of drums are stored in these warehouses throughout the DOE complex. ARIES (Autonomous Robotic Inspection Experimental System), is under development for the DOE to survey and inspect these drums. The robot will navigate through the aisles and perform an inspection operation, typically performed by a human operator, making decisions about the condition of the drums and maintaining a database of pertinent information about each drum.

Byrd, J.S.

1995-12-01T23:59:59.000Z

459

An intelligent inspection and survey robot  

SciTech Connect (OSTI)

Large quantities of mixed/low-level radioactive waste contained in 55-, 85-, and 110-gallon steel drums are stored at DOE warehouses throughout US. The steel drums are placed on pallets and stacked on top of one another, forming a column of drums ranging in heights of one to five drums and up to 16 feet. The columns of drums are aligned in rows forming aisles about 3 feet wide between the rows of drums. Many tens of thousands of drums are stored in these warehouses. ARIES (Autonomous Robotic Inspection Experimental System) is under development for DOE to survey and inspect these drums. The mobile robot will autonomously navigate through the warehouse and the aisles and perform an inspection operation, typically performed by a human operator, making decisions about the condition of the drums and maintaining a database of pertinent information about each drum.

Byrd, J.S. [South Carolina Univ., Columbia, SC (United States). Dept. of Electrical and Computer Engineering

1996-12-31T23:59:59.000Z

460

Resonant frequency method for bearing ball inspection  

DOE Patents [OSTI]

The present invention provides for an inspection system and method for detecting defects in test objects which includes means for generating expansion inducing energy focused upon the test object at a first location, such expansion being allowed to contract, thereby causing pressure wave within and on the surface of the test object. Such expansion inducing energy may be provided by, for example, a laser beam or ultrasonic energy. At a second location, the amplitudes and phases of the acoustic waves are detected and the resonant frequencies' quality factors are calculated and compared to predetermined quality factor data, such comparison providing information of whether the test object contains a defect. The inspection system and method also includes means for mounting the bearing ball for inspection.

Khuri-Yakub, B. T. (Palo Alto, CA); Hsieh, Chung-Kao (Stanford, CA)

1993-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "inspection maintenance repairs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Resonant frequency method for bearing ball inspection  

DOE Patents [OSTI]

The present invention provides for an inspection system and method for detecting defects in test objects which includes means for generating expansion inducing energy focused upon the test object at a first location, such expansion being allowed to contract, thereby causing pressure wave within and on the surface of the test object. Such expansion inducing energy may be provided by, for example, a laser beam or ultrasonic energy. At a second location, the amplitudes and phases of the acoustic waves are detected and the resonant frequencies' quality factors are calculated and compared to predetermined quality factor data, such comparison providing information of whether the test object contains a defect. The inspection system and method also includes means for mounting the bearing ball for inspection. 5 figures.

Khuri-Yakub, B.T.; Chungkao Hsieh.

1993-11-02T23:59:59.000Z

462

X-ray radiography for container inspection  

DOE Patents [OSTI]

Arrangements of X-ray inspection systems are described for inspecting high-z materials in voluminous objects such as containers. Inspection methods may involve generating a radiographic image based on detected attenuation corresponding to a pulsed beams of radiation transmitted through a voluminous object. The pulsed beams of radiation are generated by a high-energy source and transmitted substantially downward along an incident angle, of approximately 1.degree. to 30.degree., to a vertical axis extending through the voluminous object. The generated radiographic image may be analyzed to detect on localized high attenuation representative of high-z materials and to discriminate high-z materials from lower and intermediate-z materials on the basis of the high density and greater attenuation of high-z material for higher energy (3-10 MeV) X-rays, and the compact nature of threatening masses of fissionable materials.

Katz, Jonathan I. (Clayton, MO); Morris, Christopher L. (Los Alamos, NM)

2011-06-07T23:59:59.000Z

463

Criticality Safety Controls Implementation Inspection Criteria, Approach,  

Broader source: Energy.gov (indexed) [DOE]

Criticality Safety Controls Implementation Inspection Criteria, Criticality Safety Controls Implementation Inspection Criteria, Approach, and Lines of Inquiry, October 23, 2009, (HSS CRAD 64-18, Rev 0 ) Criticality Safety Controls Implementation Inspection Criteria, Approach, and Lines of Inquiry, October 23, 2009, (HSS CRAD 64-18, Rev 0 ) DOE has set expectations for implementing criticality safety controls that are selected to provide preventive and/or mitigative functions for specific potential accident scenarios. There are additional expectations for criticality safety controls that are also designated as Specific Administrative Controls (SACs) (see HSS CRAD 64-32). Also, in instances when the review addresses functionality and operability of structures, systems, and components (SSCs) of nuclear facilities specifically required

464

International congress on DNA damage and repair: Book of abstracts  

SciTech Connect (OSTI)

This document contains the abstracts of 105 papers presented at the Congress. Topics covered include the Escherichia coli nucleotide excision repair system, DNA repair in malignant transformations, defective DNA repair, and gene regulation. (TEM)

Not Available

1987-01-01T23:59:59.000Z

465

Independent Oversight Inspection, Savannah River Site - February 2006 |  

Broader source: Energy.gov (indexed) [DOE]

February February 2006 Independent Oversight Inspection, Savannah River Site - February 2006 February 2006 Inspection of Emergency Management at the Savannah River Site The U.S. Department of Energy (DOE) Office of Independent Oversight conducted an inspection of environment, safety, and health and emergency management programs at the DOE Savannah River Site (SRS) in January and February 2006. The inspection was performed as a joint effort by Independent Oversight's Office of Environment, Safety and Health Evaluations and Office of Emergency Management Oversight. This 2006 Independent Oversight inspection found that nearly all of the WSRC weaknesses from the 2004 inspection have been addressed. Actions included implementing a comprehensive hazardous material screening process,

466

Operations and Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Operations and Maintenance Operations and Maintenance Operations and Maintenance October 16, 2013 - 5:01pm Addthis Project Construction Commissioning Operations & Maintenance Operations and maintenance (O&M) programs are critical to successfully integrating renewable energy into new Federal building construction and major renovations. This overview covers the importance of O&M programs for renewable energy projects, creating a successful O&M program, and identifying the right team to carry out the program. It highlights typical renewable energy issues and recommends following the design, specifications, and recommendations from product manufacturers. Key Actions in Operations and Maintenance Make O&M a priority to protect agency investment. Include O&M input in design reviews.

467

Predictive Maintenance Technologies | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Maintenance Technologies Maintenance Technologies Predictive Maintenance Technologies October 28, 2013 - 10:15am Addthis Several diagnostic technologies and best practices are available to assist Federal agencies with predictive maintenance programs. Chapter 6 of the FEMP O&M Best Practices Guide (PDF 721 KB) outlines these technologies in detail. The full guide is also available (PDF 3.3 MB). Predictive maintenance technologies include: Thermography: Infrared imaging is used to generate visual images that identify variations in the infrared radiance of object surfaces. This method can be used to detect system surface wear, leaks, or failures. Lubricant and Wear Particle Analysis (a.k.a. Oil Analysis): Detailed analysis is taken to determine needed maintenance based on lubrication

468

Inspection Report: IG-0594 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4 4 Inspection Report: IG-0594 March 31, 2003 Emergency Medical Coordination Memorandum of Agreement at Brookhaven National Laboratory Because of possible exposure to radioactive and hazardous materials and the potential for industrial accidents at Department of Energy (DOE) sites, the Department has established formalized agreements with local emergency medical providers. These arrangements are generally documented through memoranda of agreements (MOAs). These documents detail the mutual understanding between DOE and the offsite emergency medical provider with respect to capabilities, specific support, and procedures for ensuring an integrated and effective response, including specific procedures for receipt of victims of radiation accidents. Inspection Report: IG-0594

469

Inspection Report: IG-0734 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4 4 Inspection Report: IG-0734 July 26, 2006 Internal Controls for Excessing and Surplusing Unclassified Computers atLos Alamos National Laboratory The Department of Energy's (DOE's) Los Alamos National AND OBJECTIVE Laboratory (LANL) is one of the largest multidisciplinary science institutions in the world. The primary national security missions of LANL are to help ensure the safety and reliability of the Nation's nuclear stockpile, prevent the spread of weapons of mass destruction, develop strategies to mitigate global threats, and protect the United States from terrorist attacks. LANL is managed by the University of California for the Department's National Nuclear Security Administration (NNSA). Inspection Report: IG-0734 More Documents & Publications

470

Inspection Report: IG-0770 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0 0 Inspection Report: IG-0770 July 20, 2007 Protective Force MK-19 Grenade Launcher Use at the National Nuclear Security Administration's Pantex Facility The National Nuclear Security Administration's (NNSA) Pantex Facility is this Nation's only nuclear weapons assembly and disassembly facility. The nature of such work necessitates the development and implementation of protection strategies based upon the Department of Energy's (Department) Design Basis Threat process. Facilities such as Pantex develop Site Safeguards and Security Plans to describe the physical protection programs, evaluations of risk, and identified facility targets associated with the threat. Inspection Report: IG-0770 More Documents & Publications 40 MM Grenade Launcher Qualification Requirements at Department of Energy

471

Inspection Report: IG-0605 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

05 05 Inspection Report: IG-0605 June 5, 2003 National Nuclear Security Administration's Ability to Meet the Aircraft Requirements of the Joint Technical Operations Team Worldwide events have heightened concerns over terrorist attacks, particularly with regard to the possible use of weapons of mass destruction, including radioactive devices, in such attacks. A recent training exercise in Seattle, Washington, involving a simulated terrorist attack using a radioactive "dirty bomb" highlighted the importance of cooperation and coordination by Federal, State, and local governments in providing a rapid, planned response to a terrorist incident involving a weapon of mass destruction. Inspection Report: IG-0605 More Documents & Publications Audit Report: IG-0435

472

Raft river geothermal pump disassembly and inspection  

SciTech Connect (OSTI)

The disassembly and postoperation inspection of the Peerless geothermal water pump used in teh RRGE-1 well at the Raft River Geothermal Test Site are summarized. Disassembly was hampered by scale that froze some of the pump bearings onto the impeller shaft after operation ceased. The pump appeared otherwise in generally excellent condition after more than 1600 h running time in a geothermal environment. Most postoperation diameters of rotating parts were still within factory tolerance. The few out-of-tolerance bearing diameters could not be attributed to wear and could have been out of tolerance when received. This possibility points to a need for preoperation quality-control inspection of the bearings.

Van Treeck, R.

1983-02-01T23:59:59.000Z

473

Development and testing of a low-maintenance, energy-absorbing bridge rail  

E-Print Network [OSTI]

vehicle leaves the flow of traffic and strikes a bridge rail. The second concern is for the safety of the maintenance workers who must repair bridge rail damage following a collision. Third, the increasing cost of maintaining br idge decks and rails... during a more severe collision. Furthermore, the new bridge rail is designed to fit either new or existing standard bridge decks. Following development of the new bridge rail, two full-scale vehicle crash-tests were performed at the TTI Research...

Cain, John Craig

2012-06-07T23:59:59.000Z

474

Human embryonic stem cells for brain repair?  

Science Journals Connector (OSTI)

...repair compiled by Siddharthan Chandran, Maeve Caldwell and Nick Allen Human embryonic stem cells for brain repair? Su-Chun...stromal cell co-culture system. This type of technique has merits in its simplicity and the differentiated progenies appear to...

2008-01-01T23:59:59.000Z

475

FACILITY MAINTENANCE MANAGEMENT QUALIFICATION STANDARD REFERENCE GUIDE  

Broader source: Energy.gov (indexed) [DOE]

Facility Facility Maintenance Management Qualification Standard Reference Guide NOVEMBER 2009 Table of Contents i FIGURES...................................................................................................................................... iv TABLES........................................................................................................................................ iv ACRONYMS ................................................................................................................................. v PURPOSE...................................................................................................................................... 1 SCOPE ...........................................................................................................................................

476

FAQS Reference Guide – Facility Maintenance Management  

Broader source: Energy.gov [DOE]

This reference guide addresses the competency statements in the April 2014 edition of DOE Standard DOE-STD-1181-2014, Facility Maintenance Management Functional Area Qualification Standard.

477

NSLS Services | Repair & Equipment Services  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Repair & Equipment Services Repair & Equipment Services Cleaning Facility (BNL Central Shops) Solvent cleaning of vacuum parts and leak checking service is also available. Work is billed to each user via a BNL ILR. Contact the NSLS Building Manager to arrange for any of these services. Electronics Repair Limited repairs for electronic equipment are available from an outside contractor through the Control Room. Contact Control Room Supervisor Randy Church (x2550 or x2736, pager 5310). Shipping memos are filled out on the web, and pick ups are on Fridays. Come to the Control Room for assistance. The user should call the contractor on the day before scheduled pickups to alert the contractor of the pickup. Items to be repaired should be left in the Control Room with the completed shipping memo. Costs are charged to the

478

INTERNAL REPAIR OF PIPELINES REVIEW & EVALUATION OF INTERNAL PIPELINE REPAIR TRIALS REPORT  

SciTech Connect (OSTI)

The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is generally ineffective at restoring the pressure containing capabilities of pipelines. Failure pressure for pipe repaired with carbon fiber-reinforced composite liner was greater than that of the un-repaired pipe section with damage, indicating that this type of liner is effective at restoring the pressure containing capability of pipe. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. Development of a comprehensive test plan for this process is recommended for use in the next phase of this project.

Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; George Ritter; Bill Mohr; Matt Boring; Nancy Porter; Mike Sullivan; Chris Neary

2004-09-01T23:59:59.000Z

479

Scheduling screening inspections for replaceable and non-replaceable systems  

E-Print Network [OSTI]

This dissertation focuses on developing inspection schedules to detect non-self- announcing events which can only detected by inspections. Failures of protective sys- tems ,such as electronic equipments, alarms and stand-by systems, incipient...

Aral, Bahadir

2009-05-15T23:59:59.000Z

480

Inspection Report: S02IS020 | Department of Energy  

Office of Environmental Management (EM)

S02IS020 Inspection Report: S02IS020 March 25, 2002 Inspection of Training Issues at the Rocky Flats Field Office Not Available for Viewing More Documents & Publications Special...

Note: This page contains sample records for the topic "inspection maintenance repairs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Inspection Report: S05IS022 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

22 Inspection Report: S05IS022 March 21, 2005 Review of Possible Inappropriate Job Solicitation Not Available for Viewing More Documents & Publications Inspection Report: S05IS042...

482

On-Site Disposal Facility Inspection Report  

Office of Legacy Management (LM)

72.1 0614 On-Site Disposal Facility Inspection Report June 2014 6319-D6320 8972.2 0614 East Face Cell 1 West Face Cell 1 6319D-6322 6319D-6346 8972.3 0614 North Face Cell 1...

483

Explosion proof vehicle for tank inspection  

DOE Patents [OSTI]

An Explosion Proof Vehicle (EPV) having an interior substantially filled with an inert fluid creating an interior pressure greater than the exterior pressure. One or more flexible tubes provide the inert fluid and one or more electrical conductors from a control system to the vehicle. The vehicle is preferably used in subsurface tank inspection, whereby the vehicle is submerged in a volatile fluid.

Zollinger, William T. (Idaho Falls, ID); Klingler, Kerry M. (Idaho Falls, ID); Bauer, Scott G. (Idaho Falls, ID)

2012-02-28T23:59:59.000Z

484

Field Inspection Guidelines for PV Systems  

Broader source: Energy.gov [DOE]

This 2010 update to the 2006 edition consolidates the most import aspects of a field inspection into a simple process that can be performed in as little as 15 minutes. Explanations and illustrative pictures are included to instruct the inspector on the specific details of each step.

485

Optimal scheduling of non-perfect inspections  

Science Journals Connector (OSTI)

......loose connection of pipes and joints, battery measurements, perform starting, stopping...if adequate techniques are used, the fuel, cooling water and lubricant oil level...standby gener- ators may imply to inspect batteries and filters, e.g. at different frequencies......

R. I. Zequeira; C. Bérenguer

2006-04-01T23:59:59.000Z

486

Remotely deployable aerial inspection using tactile sensors  

SciTech Connect (OSTI)

For structural monitoring applications, the use of remotely deployable Non-Destructive Evaluation (NDE) inspection platforms offer many advantages, including improved accessibility, greater safety and reduced cost, when compared to traditional manual inspection techniques. The use of such platforms, previously reported by researchers at the University Strathclyde facilitates the potential for rapid scanning of large areas and volumes in hazardous locations. A common problem for both manual and remote deployment approaches lies in the intrinsic stand-off and surface coupling issues of typical NDE probes. The associated complications of these requirements are obviously significantly exacerbated when considering aerial based remote inspection and deployment, resulting in simple visual techniques being the preferred sensor payload. Researchers at Bristol Robotics Laboratory have developed biomimetic tactile sensors modelled on the facial whiskers (vibrissae) of animals such as rats and mice, with the latest sensors actively sweeping their tips across the surface in a back and forth motion. The current work reports on the design and performance of an aerial inspection platform and the suitability of tactile whisking sensors to aerial based surface monitoring applications.

MacLeod, C. N.; Cao, J.; Pierce, S. G.; Dobie, G.; Summan, R. [Centre for Ultrasonic Engineering, University of Strathclyde, Glasgow, G1 1XW (United Kingdom); Sullivan, J. C.; Pipe, A. G. [Bristol Robotics Laboratory, University of the West of England, Bristol, BS16 1QY (United Kingdom)

2014-02-18T23:59:59.000Z

487

Integrated spare parts logistics and operations planning for maintenance service providers  

Science Journals Connector (OSTI)

Abstract This paper considers the problem of coordinated spare-part logistics and operations planning for third-party maintenance providers. Due to the multi-indenture structure of the equipment, different types of components might randomly fail to perform at different points of time. The spare part logistics literature has been focused on spare part inventory management in an in-house maintenance context. In this article, a mathematical programming model is first developed to formulate the problem in the context of a third-party maintenance provider who is faced with strict due dates for the delivery of repaired equipment. The model seeks the optimal number of maintenance jobs that can be completed to deliver at each period, as well as the order quantity of spare parts so as to minimize the procurement, inventory, and equipment late delivery costs, while taking into account the spare part supply lead-time. Next, we model the spare part demand uncertainty as a non-stationary stochastic process in each period in the planning horizon. The deterministic model is then reformulated as a multi-stage stochastic program with recourse. We also discuss the complexity of the stochastic model and propose a preprocessing approach to reduce its size for large instances. Numerical results demonstrate how the proposed model links the spare part logistics and equipment delivery decisions under spare part demand uncertainty.

Masoumeh Kazemi Zanjani; Mustapha Nourelfath

2014-01-01T23:59:59.000Z

488

Composite wrap approved for U.S. gas-pipeline repairs  

SciTech Connect (OSTI)

The US agency that oversees pipeline safety has taken the unusual step of waiving certain natural-gas pipeline maintenance regulations and permitted a group of gas-pipeline operators to perform repairs with a patented composite wrap formerly used only on liquids lines. The waivers ar subject to conditions and to future performance evaluations. The wrap is made of polyester resin reinforced by glass filament. On installation, it is tightly wound and adhesively bonded to damaged pipe. The paper describes the 2 waivers, the development of this new technology, savings, and training required by the Dept. of Transportation.

True, W.R.

1995-10-09T23:59:59.000Z

489

Licensee contractor and vendor inspection status report. Quarterly report, January 1995--March 1995  

SciTech Connect (OSTI)

This periodical covers the results of inspections performed by the NRC`s Special Inspection Branch, Vendor Inspection Section, that have been distributed to the inspected organizations during the period from January 1995 through March 1995.

NONE

1995-05-01T23:59:59.000Z

490

Software Testing and Maintenance 1 Regression Testing  

E-Print Network [OSTI]

1 Software Testing and Maintenance 1 Regression Testing Introduction Test Selection Test Minimization Test Prioritization Summary Software Testing and Maintenance 2 What is it? Regression testing refers to the portion of the test cycle in which a program is tested to ensure that changes do not affect

Lei, Jeff Yu

491

Microsoft Word - CX-IndianCabinRoadRepair_PPA1908_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

United States Government Department of Energy United States Government Department of Energy Bonneville Power Administration DATE: June 22, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Elizabeth Johnson Natural Resource Specialist - TFBV-THE DALLES Proposed Action: Indian Cabin Road Repair PP&A Project No.: 1908 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights of way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designated purpose. Location: The project is located in Skamania County, Washington, T3N, R8E, Sections 27

492

241-AY-102 Leak Detection Pit Drain Line Inspection Report  

SciTech Connect (OSTI)

This document provides a description of the design components, operational approach, and results from the Tank AY-102 leak detection pit drain piping visual inspection. To perform this inspection a custom robotic crawler with a deployment device was designed, built, and operated by IHI Southwest Technologies, Inc. for WRPS to inspect the 6-inch leak detection pit drain line.

Boomer, Kayle D. [Washington River Protection Solutions, LLC (United States); Engeman, Jason K. [Washington River Protection Solutions, LLC (United States); Gunter, Jason R. [Washington River Protection Solutions, LLC (United States); Joslyn, Cameron C. [Washington River Protection Solutions, LLC (United States); Vazquez, Brandon J. [Washington River Protection Solutions, LLC (United States); Venetz, Theodore J. [Washington River Protection Solutions, LLC (United States); Garfield, John S. [AEM Consulting (United States)

2014-01-20T23:59:59.000Z

493

Seafood Inspection Program U.S. Department of Commerce  

E-Print Network [OSTI]

Seafood Inspection Program U.S. Department of Commerce 1315 East-West Highway Silver Spring, Maryland 20910-3282 USA MEMORANDUM FOR: All Plants and Users of USDC Seafood Inspection Program Services FROM: Timothy E. Hansen Director, Seafood Inspection Program SUBJECT: Notice of Change in Fees

494

Diverless pipeline repair clamp: Phase 1  

SciTech Connect (OSTI)

Offshore oil and gas developments are underway for water depths beyond which divers can function. The economic lifelines of these projects are the pipelines which will transport the products to shore. In preparation for the day when one of these pipelines will require repair because of a leak, the Pipeline Research Committee of the American Gas Association is funding research directed at developing diverless pipeline repair capabilities. Several types of damage are possible, ranging from latent weld defects on one end of the spectrum to damage resulting in parting of the pipe at the other end. This study is specifically directed toward laying the groundwork for development of a diverless pipeline repair clamp for use in repair of leaks resulting from minor pipe defects. The incentive for a clamp type repair is costs. When compared to replacing a section of pipe, either by welding or by mechanical means, the clamp type repair requires much less disturbance of the pipe, less time, fewer operations and less equipment. This report summarizes (1) capabilities of remotely operated vehicles (ROV's) and associated systems, (2) highlights areas for further research and development, (3) describes the required capabilities of the diverless repairclamp, (4) investigates some alternatives to the diverless clamp, (5) overviews the state of the art in leak repair clamps, and (6) critiques several possible generic clamp concepts.

Miller, J.E.; Knott, B. (Stress Engineering Services, Inc., Houston, TX (United States))

1991-12-01T23:59:59.000Z

495

Operations and Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Program Areas » Operations and Maintenance Program Areas » Operations and Maintenance Operations and Maintenance October 4, 2013 - 5:07pm Addthis Federal facilities rely on pumps, motors, fans, and other mechanical systems for everyday operations. These systems must be maintained and operated correctly to reach their full potential. Well-executed operations and maintenance (O&M) programs promote energy efficiency and life cycle performance and can save Federal agencies 5% to 20% on annual energy bills without significant capital investments. Learn about: Federal Requirements: Look up O&M-related requirements that Federal agencies must meet as outlined by law and executive order Management Process: Learn about the operations and maintenance management process Commissioning: Get an overview of commissioning processes

496

Federal Energy Management Program: Operations and Maintenance Contacts  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Contacts to someone by E-mail Contacts to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Contacts on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Contacts on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Contacts on Google Bookmark Federal Energy Management Program: Operations and Maintenance Contacts on Delicious Rank Federal Energy Management Program: Operations and Maintenance Contacts on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Contacts on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types

497

Federal Energy Management Program: Reliability-Centered Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Reliability-Centered Maintenance to someone by E-mail Share Federal Energy Management Program: Reliability-Centered Maintenance on Facebook Tweet about Federal Energy Management Program: Reliability-Centered Maintenance on Twitter Bookmark Federal Energy Management Program: Reliability-Centered Maintenance on Google Bookmark Federal Energy Management Program: Reliability-Centered Maintenance on Delicious Rank Federal Energy Management Program: Reliability-Centered Maintenance on Digg Find More places to share Federal Energy Management Program: Reliability-Centered Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems

498

COMPARISON OF DETECTION CAPABILITY FOR ACOUSTIC THERMOGRAPHY, VISUAL INSPECTION AND FLUORESCENT PENETRANT INSPECTION ON GAS TURBINE COMPONENTS  

Science Journals Connector (OSTI)

The innovative NDE inspection system Acoustic Thermography is developed with Sonic Infrared (Sonic IR) technology. Since the probability of detection is sensitive to the flaw characteristics the fabricated flaws could not simulated the nature flaws with accuracy. The study is focus on gas turbine blades with service induced fatigue cracks. The detection capability of this innovative NDE inspection system is compared with two traditional NDE methods: Visual Inspection and Fluorescent Penetrant Inspection. POD curves for each technique were generated and compared.

Y. Guo; F. R. Ruhge

2009-01-01T23:59:59.000Z

499

ILLINOIS -RAILROAD ENGINEERING A Feasibility Study of MachineA Feasibility Study of Machine--Vision InspectionVision Inspection  

E-Print Network [OSTI]

documented making defect trending difficult · Inefficient use of skilled labor (carmen) 4 Carmen 25 Cars Yard Questions and Comments #12;Slide 3 ILLINOIS - RAILROAD ENGINEERING Car Inspection Background Why are railcars cars inspected? · Safety · Efficiency Inspections address: · Braking System · Safety Appliances

Barkan, Christopher P.L.

500

Protocol, Inspection Criteria - April 23, 2008 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Inspection Criteria - April 23, 2008 Inspection Criteria - April 23, 2008 Protocol, Inspection Criteria - April 23, 2008 April 23, 2008 Inspection Criteria, Activities, and Lines of Inquiry, April 23, 2008 Emergency planning includes the identification of hazards and threats. A hazards survey is the qualitative portion of the hazards identification process. It briefly describes the potential impacts of emergency events or conditions and summarizes the planning and preparedness requirements that apply. If determined to be required, an EPHA includes the identification and characterization of hazardous materials specific to a facility/site, analyses of potential accidents or events, and evaluation of potential consequences. Protocol, Inspection Criteria - April 23, 2008 More Documents & Publications