National Library of Energy BETA

Sample records for inspection maintenance repair

  1. Potential inspection, maintenance and repair techniques for the OTEC (Ocean Thermal Energy Conversion) systems

    SciTech Connect (OSTI)

    Not Available

    1983-02-01

    One of the major post-installation considerations of the OTEC platforms is the performance of underwater inspection, maintenance and repair (IMR) during their 30-year design life. In order to assist in the conceptual development of an IMR program, this study was undertaken using the two OTEC candidate configurations as a baseline. The objectives of the study were: (1) conduct an inventory of underwater Non-Destructive Examination (NDE) devices including a description of their performance capabilities, dimensional data, the areas of the various structures where they are most applicable, and a narrative description of the level of performance attained to date; (2) and to conduct an inventory of NDE device deployment vehicles which also includes a description of their performance capabilities, dimensional data, areas of the platform where they are most applicable as now designed and a relative comparison of these vehicles as to their ability to deploy the devices described in (1) above.

  2. Underwater inspection, maintenance and repair study for the 40 MW OTEC pilot plant

    SciTech Connect (OSTI)

    Fishel, K.; Aboumrad, J.; Clinkenbeard, J.; Spiro, J.

    1982-06-01

    The objective of this research was to study candidate OTEC 40 MWe systems to determine underwater inspection requirements, and the instrumentation, equipment and data acquisition systems which will be required for inspection of the structure and monitoring of the operational condition of the system. The study was based on current literature, existing offshore platforms, discussions with experts in the field, and on the experience and judgment of the investigators. Results of the study are published in the form of a report showing the background, approach, data and information obtained. Conclusions and recommendations are presented.

  3. Study to develop an inspection, maintenance, and repair plan for OTEC (Ocean Thermal Energy Conversion) modular experiment plants. Final report

    SciTech Connect (OSTI)

    Not Available

    1980-04-01

    The inspection, maintenance and repair (IM and R) of the Ocean Thermal Energy Conversion (OTEC) Modular Experiment Plant (Pilot Plant) have been studied in two phases: Task I and Task II. Task I phase developed IM and R identification forms, identified requirements for routine and post casualty IM and R, and categorized and outlined potential procedures to perform IM and R activities. The efforts of the Task II phase have been directed to meet the following objectives: to provide feedback to the OTEC marine systems designs to assure that such designs reflect appropriate consideration of IM and R methods and unit costs, resulting in designs with reduced life cycle costs; to include technical information concerning OTEC IM and R possibilities to NOAA/DOE; to outline a basis in which the anticipated IM and R contributions to life cycle costs can be developed for any specific OTEC plant design; to identify IM and R methods within the state-of-the-art in the offshore industry; to determine the application of potential IM and R procedures for the commercial operation of OTEC 10/40 Pilot Plant(s); and input into the US government formulation of statutory and regulatory IM and R requirements for OTEC plants.

  4. Solar Water Heating System Maintenance and Repair | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair Rooftop solar water heaters need regular maintenance to operate at peak efficiency. | Photo from iStockphoto.com Rooftop solar water heaters need regular maintenance to operate at peak efficiency. | Photo from iStockphoto.com Solar energy systems require periodic inspections and routine maintenance to keep them operating efficiently. Also, from time to time, components may need repair or replacement.

  5. Inspect and Repair Steam Traps

    SciTech Connect (OSTI)

    Not Available

    2006-01-01

    This revised ITP tip sheet on inspecting and repairing steam traps provide how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  6. Solar Water Heating System Maintenance and Repair | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair Rooftop solar water heaters need regular maintenance to operate at peak efficiency. |...

  7. Developments advance subsea pipelaying, inspection, repair

    SciTech Connect (OSTI)

    1997-09-15

    Recent advances in laying, inspecting, and repairing pipelines are helping to cut both costs and time. A new dredging system that employs jets to clear a subsea trench for pipelay received trials off Belgium last spring. Also, within the last year, projects in the Middle East and North Sea employed technologies that promise to make inspecting the surface of a subsea pipeline in difficult terrain easier, less time consuming, and therefore less costly. Plus, subsea repair of damaged pipelines may take less time with a new ``stabbable`` pipe connector. The paper describes jet dredging, inspection advance, support software, the North Sea site, and pipeline repair.

  8. GIZ Sourcebook Module 4b: Inspection and Maintenance and Roadworthines...

    Open Energy Info (EERE)

    b: Inspection and Maintenance and Roadworthiness Jump to: navigation, search Tool Summary LAUNCH TOOL Name: GIZ Sourcebook Module 4b: Inspection and Maintenance and Roadworthiness...

  9. Solar Water Heating System Maintenance and Repair | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair May 30, 2012 - 2:35pm Addthis Rooftop solar water heaters need regular maintenance to...

  10. Inspect and Repair Steam Traps | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Inspect and Repair Steam Traps Inspect and Repair Steam Traps This tip sheet on inspecting and repairing steam traps provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies. STEAM TIP SHEET #1 PDF icon Inspect and Repair Steam Traps (January 2012) More Documents & Publications Flash High-Pressure Condensate to Regenerate Low-Pressure Steam Use Steam Jet Ejectors or Thermocompressors to Reduce Venting of Low-Pressure Steam Recover Heat

  11. SNL Researchers Assess Wind Turbine Blade Inspection and Repair Methods |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy SNL Researchers Assess Wind Turbine Blade Inspection and Repair Methods SNL Researchers Assess Wind Turbine Blade Inspection and Repair Methods May 18, 2015 - 5:32pm Addthis A picture of several wind turbine blade panels set out on a table and held in place with metal clamps. Flaws in wind turbine blades emanating from the manufacturing process are an important factor in blade reliability. Blade failures can cause extensive down time and lead to expensive repairs, which

  12. Inspect and Repair Steam Traps - Steam Tip Sheet #1

    SciTech Connect (OSTI)

    2012-01-31

    This revised AMO tip sheet on inspecting and repairing steam traps provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  13. Simple Maintenance Saves Costly Furnace Repair/Replacement | Department of

    Energy Savers [EERE]

    Energy Simple Maintenance Saves Costly Furnace Repair/Replacement Simple Maintenance Saves Costly Furnace Repair/Replacement January 6, 2010 - 8:26am Addthis Chris Stewart Senior Communicator at DOE's National Renewable Energy Laboratory For the past few weeks, my forced-air gas furnace has been on the fritz. I blame this on the fact that I haven't been as diligent as I should have been with regular furnace maintenance, which includes: Checking the condition of the vent connection pipe and

  14. Managing aging in nuclear power plants: Insights from NRC maintenance team inspection reports

    SciTech Connect (OSTI)

    Fresco, A.; Subudhi, M.; Gunther, W.; Grove, E.; Taylor, J.

    1993-12-01

    A plant`s maintenance program is the principal vehicle through which age-related degradation is managed. From 1988 to 1991, the NRC evaluated the maintenance program of every nuclear power plant in the United States. Forty-four out of a total of 67 of the reports issued on these in-depth team inspections were reviewed for insights into the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear plant systems, structures, and components. Relevant information was extracted from these inspection reports and sorted into several categories, including Specific Aging Insights, Preventive Maintenance, Predictive Maintenance and Condition Monitoring, Post Maintenance Testing, Failure Trending, Root Cause Analysis and Usage of Probabilistic Risk Assessment in the Maintenance Process. Specific examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging have been identified. The information also was sorted according to systems and components, including: Auxiliary Feedwater, Main Feedwater, High Pressure Injection for both BWRs and PWRs, Service Water, Instrument Air, and Emergency Diesel Generator Air Start Systems, and Emergency Diesel Generators Air Start Systems, emergency diesel generators, electrical components such as switchgear, breakers, relays, and motor control centers, motor operated valves and check valves. This information was compared to insights gained from the Nuclear Plant Aging Research (NPAR) Program. Attributes of plant maintenance programs where the NRC inspectors felt that improvement was needed to properly address the aging issue also are discussed.

  15. Y-12 Groundwater Protection Program Monitoring Well Inspection And Maintenance Plan

    SciTech Connect (OSTI)

    2013-09-01

    This document is the fourth revision of the Monitoring Well Inspection and Maintenance Plan for groundwater monitoring wells installed at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. This plan describes the systematic approach for:  inspecting the physical condition of monitoring wells at Y-12,  determining maintenance needs that extend the life of a well, and  identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment.

  16. Y-12 Groundwater Protection Program Monitoring Well Inspection and Maintenance Plan

    SciTech Connect (OSTI)

    2013-09-01

    This document is the fourth revision of the Monitoring Well Inspection and Maintenance Plan for groundwater monitoring wells installed at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. This plan describes the systematic approach for: inspecting the physical condition of monitoring wells at Y-12, determining maintenance needs that extend the life of a well, and identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment. This plan applies to groundwater monitoring wells installed at Y-12 and the related waste management facilities located within the three hydrogeologic regimes.

  17. Review of Maintenance and Repair Times for Components in Technological Facilities

    SciTech Connect (OSTI)

    L. C. Cadwallader

    2012-11-01

    This report is a compilation of some unique component repair time data and it also presents citations of more extensive reports where lists of repair times can be found. This collection of information should support analysts who seek to quantify maintainability and availability of high technology and nuclear energy production systems. While there are newer sources of repair time information, most, if not all, of the newer sources are proprietary and cannot be shared. This report offers data that, while older, is openly accessible and can serve as reasonable estimates of repair times, at least for initial studies. Some times were found for maintenance times in radiation environments, and some guidance for multiplicative factors to use to account for work in contamination areas.

  18. ASTRID sodium cooled fast reactor: Program for improving in service inspection and repair

    SciTech Connect (OSTI)

    Jadot, F.; De Dinechin, G.; Augem, J. M.; Sibilo, J.

    2011-07-01

    In the frame of the CEA, EDF, AREVA coordinated research program for the development of Generation IV sodium-cooled fast reactors (SFR), the ASTRID project was launched in 2010. For the future prototype, the improvement of in-service inspection and repair (ISI and R) capabilities was identified as a major issue. Following the pluri-annual SFR research program, the ISI and R main R and D axes remain: i) improvement of the primary system conceptual design, ii) development of measurement and inspection techniques (continuous monitoring instrumentation and periodic inspection tools), iii) accessibility and associated robotics, and iv) development and validation of repair processes. Associated ISI and R needs are being defined through an iterative method between designers and instrumentation specialists: adaptation of the Design to ISI and R requirements, fission chamber development, validation of the ultrasonic and chemical transducers, of ultrasonic non destructive simulation, of acoustic surveillance, of laser repair intervention processes, of connected robotic equipment. Moreover, CEA, as leader of the ASTRID Project, is willing to find new contributors, partners or suppliers, in order to get innovative, diversified, exhaustive and efficient solutions. (authors)

  19. Tonopah Test Range Post-Closure Inspection Annual Report, Tonopah Test Range, Nevada, Calendar Year 2003

    SciTech Connect (OSTI)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Bechtel Nevada

    2004-04-01

    This post-closure inspection report provides documentation of the semiannual inspection activities, maintenance and repair activities, and conclusions and recommendations for calendar year 2003 for eight corrective action units located on the Tonopah Test Range, Nevada.

  20. POST-CLOSURE INSPECTION REPORT FOR THE TONOPAH TEST RANGE, NEVADA FOR CALENDAR YEAR 2005

    SciTech Connect (OSTI)

    2006-06-01

    This post-closure inspection report includes the results of inspections, maintenance and repair activities, and conclusions and recommendations for Calendar Year 2005 for nine Corrective Action Units located on the Tonopah Test Range , Nevada.

  1. Development and validation of nondestructive inspection techniques for composite doubler repairs on commercial aircraft

    SciTech Connect (OSTI)

    Roach, D.; Walkington, P.

    1998-05-01

    Composite doublers, or repair patches, provide an innovative repair technique which can enhance the way aircraft are maintained. Instead of riveting multiple steel or aluminum plates to facilitate an aircraft repair, it is possible to bond a single boron-epoxy composite doubler to the damaged structure. In order for the use of composite doublers to achieve widespread use in the civil aviation industry, it is imperative that methods be developed which can quickly and reliably assess the integrity of the doubler. In this study, a specific composite application was chosen on an L-1011 aircraft in order to focus the tasks on application and operation issues. Primary among inspection requirements for these doublers is the identification of disbonds, between the composite laminate and aluminum parent material, and delaminations in the composite laminate. Surveillance of cracks or corrosion in the parent aluminum material beneath the doubler is also a concern. No single nondestructive inspection (NDI) method can inspect for every flaw type, therefore it is important to be aware of available NDI techniques and to properly address their capabilities and limitations. A series of NDI tests were conducted on laboratory test structures and on full-scale aircraft fuselage sections. Specific challenges, unique to bonded composite doubler applications, were highlighted. An array of conventional and advanced NDI techniques were evaluated. Flaw detection sensitivity studies were conducted on applicable eddy current, ultrasonic, X-ray and thermography based devices. The application of these NDI techniques to composite doublers and the results from test specimens, which were loaded to provide a changing flaw profile, are presented in this report. It was found that a team of these techniques can identify flaws in composite doubler installations well before they reach critical size.

  2. Subterranean barriers, methods, and apparatuses for forming, inspecting, selectively heating, and repairing same

    DOE Patents [OSTI]

    Nickelson, Reva A. (Shelley, ID); Sloan, Paul A. (Rigby, ID); Richardson, John G. (Idaho Falls, ID); Walsh, Stephanie (Idaho Falls, ID); Kostelnik, Kevin M. (Idaho, ID)

    2009-04-07

    A subterranean barrier and method for forming same are disclosed, the barrier including a plurality of casing strings wherein at least one casing string of the plurality of casing strings may be affixed to at least another adjacent casing string of the plurality of casing strings through at least one weld, at least one adhesive joint, or both. A method and system for nondestructively inspecting a subterranean barrier is disclosed. For instance, a radiographic signal may be emitted from within a casing string toward an adjacent casing string and the radiographic signal may be detected from within the adjacent casing string. A method of repairing a barrier including removing at least a portion of a casing string and welding a repair element within the casing string is disclosed. A method of selectively heating at least one casing string forming at least a portion of a subterranean barrier is disclosed.

  3. Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2012

    SciTech Connect (OSTI)

    2013-03-01

    This report summarizes the 2012 annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site (Salmon site). The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. A revised plan is in preparation. The Long-Term Surveillance Plan for the Salmon, Mississippi, Site is intended for release in 2013. The Salmon site consists of 1,470 acres. The site is located in Lamar County, Mississippi, approximately 10 miles west of Purvis, Mississippi, and about 21 miles southwest of Hattiesburg, Mississippi The State of Mississippi owns the surface real estate subject to certain restrictions related to subsurface penetration. The State is the surface operator; the Mississippi Forestry Commission is its agent. The federal government owns the subsurface real estate (including minerals and some surface features), shares right-of-entry easements with the State, and retains rights related to subsurface monitoring. The U.S. Department of Energy (DOE) Office of Legacy Management (LM), a successor agency to the U.S. Atomic Energy Commission, is responsible for the long-term surveillance of the subsurface real estate

  4. Y-12 Groundwater Protection Program CY 2009 Triennial Report Of The Monitoring Well Inspection And Maintenance Program, Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    2013-06-01

    This document is the triennial report for the Well Inspection and Maintenance Program of the Y- 12 Groundwater Protection Program (GWPP), at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12). This report formally documents well inspection events conducted on active and inactive wells at Y-12 during calendar years (CY) 2007 through 2009; it documents well maintenance and plugging and abandonment activities completed since the last triennial inspection event (CY 2006); and provides summary tables of well inspection events, well maintenance events, and well plugging and abandonment events during the reference time period.

  5. 2004 Annual Inspection for the

    Office of Legacy Management (LM)

    Naturita, Colorado Page 13-1 13.0 Naturita, Colorado, Disposal Site 13.1 Compliance Summary The Naturita, Colorado, Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I Disposal Site was inspected on May 13, 2014. The site was in excellent condition. Erosion repairs were conducted on the disposal cell access road and boulders were removed from the toe drains in March 2014. Inspectors identified no maintenance needs or cause for a follow-up inspection. 13.2 Compliance Requirements

  6. Y-12 Groundwater Protection Program CY2012 Triennial Report Of The Monitoring Well Inspection And Maintenance Program Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    2013-09-01

    This document is the triennial report for the Well Inspection and Maintenance Program of the Y- 12 Groundwater Protection Program (GWPP), at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12). This report formally documents well inspections completed by the GWPP on active and inactive wells at Y-12 during calendar years (CY) 2010 through 2012. In addition, this report also documents well inspections performed under the Y-12 Water Resources Restoration Program, which is administered by URS|CH2M Oak Ridge (UCOR). This report documents well maintenance activities completed since the last triennial inspection event (CY 2009); and provides summary tables of well inspections and well maintenance activities during the reference time period.

  7. Inspection Report: IG-0780 | Department of Energy

    Energy Savers [EERE]

    0 Inspection Report: IG-0780 October 25, 2007 Work Order Estimate and Cost Issues for Site Support Services at Los AlamosNational Laboratory The Department of Energy's Los Alamos National Laboratory (LANL) is one of the largest multidisciplinary science institutions in the world. The National Nuclear Security Administration has cognizance over the Laboratory. Site support services at LANL, including maintenance and repairs, are provided by KSL Services Joint Venture (KSL) under a 5-year, almost

  8. Post-Closure Inspection Letter Report for Corrective Action Units on the Nevada National Security Site

    SciTech Connect (OSTI)

    Boehleke, R. F.

    2014-05-06

    This letter serves as the post-closure inspection letter report for Corrective Action Units (CAUs) on the Nevada National Security Site for calendar year 2013. The inspections identified maintenance and repair is required at the following sites: sign and/or fence repair is necessary at CAUs 113, 137, 139, 140, 143, 262, 370, 371, 372, 374, 476, 478, 529, 542, and 560; animal burrows were identified at CAU 547; and erosion was identified at CAUs 366, 367, 383, 551, and 574. In addition, the following use restrictions were removed during 2013 and will no longer be inspected in 2014: 165, 357, and 528.

  9. 2006 Annual Inspection for the

    Office of Legacy Management (LM)

    3 UMTRCA Title I Annual Report March 2014 Durango, Colorado Page 4-1 4.0 Durango, Colorado, Disposal Site 4.1 Compliance Summary The Durango, Colorado, Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I Disposal Site, inspected on May 21, 2013, was in excellent condition. Vegetation on top of the disposal cell remains healthy, and the top and side slopes remain relatively free of deep-rooted species. A gap in the retention pond fence was repaired. No additional maintenance needs or

  10. POST-CLOSURE INSPECTION REPORT FOR THE TONOPAH TEST RANGE, NEVADA, FOR CALENDAR YEAR 2004

    SciTech Connect (OSTI)

    BECHTEL NEVADA

    2005-04-01

    This Post-Closure Inspection Report provides an analysis and summary of the semi-annual inspections conducted at the Tonopah Test Range (TTR) during Calendar Year 2004. The report includes the inspection and/or repair activities completed at the following nine Corrective Action Units (CAUs) located at TTR, Nevada: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 404: Roller Coaster Lagoons and Trench (TTR); (3) CAU 407: Roller Coaster RadSafe Area (TTR); (4) CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR) (5) CAU 424: Area 3 Landfill Complexes (TTR); (6) CAU 426: Cactus Spring Waste Trenches (TTR); (7) CAU 427: Area 3 Septic Waste Systems 2,6 (TTR); (8) CAU 453: Area 9 UXO Landfill (TTR); and (9) CAU 487: Thunderwell Site (TTR). Site inspections were conducted on July 7,2004, and November 9-10,2004. All inspections were conducted according to the post-closure plans in the approved Closure Reports (CRs). The post-closure inspection plan for each CAU is included in Appendix B, with the exception of CAU 400 and CAU 423. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. In addition, post-closure inspections are not currently required at CAU 423; however, the CR is being revised to include inspection requirements. The inspection checklists for each site inspection are included in Appendix C, the field notes are included in Appendix D, and the site photographs are included in Appendix E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2004, and the vegetation monitoring report is included in Appendix F. In addition, topographic survey results of two repaired landfill cells in CAU 424 are included in Appendix G. Maintenance and/or repairs were performed at the CAU 400 Five Points Landfill, CAU 407, CAU 424, CAU 427, and CAU 487. CAU 400 repairs included mending the fence, reseeding of a flood damaged area, and anchoring straw bales in the wash to help control erosion at the Five Points Landfill. CAU 407 repairs included erosion repair, reseeding the cover, and replacement of one warning sign. CAU 424 repairs included filling topographically low areas to the surrounding grade. This was performed at Landfill Cell A3-1 (CAS 03-08-001-A301) and Landfill Cell A3-4 (CAS 03-08-002-A304). CAU 427 maintenance activities included placing additional red rocks over the subsurface site markers during the July inspection to assist in locating them for future inspections. CAU 487 repairs included installing eight above-grade monuments to mark the use restriction boundaries, installing use restriction warning signs, stamping coordinates on the brass survey markers, and subsidence repair at the A-8 anomaly. With the completion of these repairs and maintenance activities, all CAUs were in excellent condition at the end of 2004. The site inspections should continue as scheduled, and any potential problem areas, such as repaired areas of erosion or subsidence, should be monitored closely for further maintenance or repair needs.

  11. Preventive Maintenance Strategies for Compressed Air Systems

    Broader source: Energy.gov [DOE]

    This tip sheet discusses preventive maintenance strategies for compressed air systems to avoid high equipment repair and replacement costs.

  12. Rapid road repair vehicle

    DOE Patents [OSTI]

    Mara, L.M.

    1998-05-05

    Disclosed is a rapid road repair vehicle capable of moving over a surface to be repaired at near normal posted traffic speeds to scan for and find at the high rate of speed, imperfections in the pavement surface, prepare the surface imperfection for repair by air pressure and vacuum cleaning, applying a correct amount of the correct patching material to effect the repair, smooth the resulting repaired surface, and catalog the location and quality of the repairs for maintenance records of the road surface. The rapid road repair vehicle can repair surface imperfections at lower cost, improved quality, at a higher rate of speed than was not heretofor possible, with significantly reduced exposure to safety and health hazards associated with this kind of road repair activities in the past. 2 figs.

  13. Rapid road repair vehicle

    DOE Patents [OSTI]

    Mara, Leo M. (Livermore, CA)

    1998-01-01

    Disclosed is a rapid road repair vehicle capable of moving over a surface to be repaired at near normal posted traffic speeds to scan for and find an the high rate of speed, imperfections in the pavement surface, prepare the surface imperfection for repair by air pressure and vacuum cleaning, applying a correct amount of the correct patching material to effect the repair, smooth the resulting repaired surface, and catalog the location and quality of the repairs for maintenance records of the road surface. The rapid road repair vehicle can repair surface imperfections at lower cost, improved quality, at a higher rate of speed than was was heretofor possible, with significantly reduced exposure to safety and health hazards associated with this kind of road repair activities in the past.

  14. Planning and care mark repair of 14-year old leak in Kuwait Oil Co. LPG tank 95

    SciTech Connect (OSTI)

    Shtayieh, S.

    1983-01-10

    This paper points out that the leak, which had been present for such a long time, completely saturated the perlite insulation with hydrocarbons, thus rendering the entire operation of inspection, repair, and maintenance of the inner tank a hazardous operation. It emphasizes the safety aspects, which were complicated by the saturated perlite as well as by the fact that the tank is situated in the middle of the LPG storage area with LPG tanks on either side. Tank design, making preparations, inspection, and repair are discussed. The fact that the leaking flanges were originally installed damaged, indicated the future need of tighter company quality control of all contractors work.

  15. Pacific Northwest Laboratory FY 1993 Site Maintenance Plan for maintenance of DOE nonnuclear facilities

    SciTech Connect (OSTI)

    Bright, J.D.

    1992-09-28

    This Site Maintenance Plan has been developed for Pacific Northwest Laboratory's (PNL) Nonnuclear Facilities. It is based on requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter I, Change No. 4. The objective of this maintenance plan is to provide baseline information for compliance to the DOE Order 4330.4A, to identify needed improvements, and to document the planned maintenance budget for Fiscal Year (FY) 1993 and to estimate maintenance budgets for FY 1994 and FY 1995 for all PNL facilities. Using the results of the self-assessment, PNL has selected 12 of the 36 elements of the Maintenance Program defined by DOE Order 4330.4A, Chapter I, for improvement. The elements selected for improvement are: Facility Condition Inspections; Work Request (Order) System; Formal Job Planning and Estimating; Work Performance (Time) Standards; Priority System; Maintenance Procedures and Other Work-Related Documents; Scheduling System; Post Maintenance Testing; Backlog Work Control; Equipment Repair History and Vendor Information; Work Sampling; and Identification and Control. Based upon a graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

  16. Pacific Northwest Laboratory FY 1993 Site Maintenance Plan for maintenance of DOE nonnuclear facilities

    SciTech Connect (OSTI)

    Bright, J.D.

    1992-09-28

    This Site Maintenance Plan has been developed for Pacific Northwest Laboratory`s (PNL) Nonnuclear Facilities. It is based on requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter I, Change No. 4. The objective of this maintenance plan is to provide baseline information for compliance to the DOE Order 4330.4A, to identify needed improvements, and to document the planned maintenance budget for Fiscal Year (FY) 1993 and to estimate maintenance budgets for FY 1994 and FY 1995 for all PNL facilities. Using the results of the self-assessment, PNL has selected 12 of the 36 elements of the Maintenance Program defined by DOE Order 4330.4A, Chapter I, for improvement. The elements selected for improvement are: Facility Condition Inspections; Work Request (Order) System; Formal Job Planning and Estimating; Work Performance (Time) Standards; Priority System; Maintenance Procedures and Other Work-Related Documents; Scheduling System; Post Maintenance Testing; Backlog Work Control; Equipment Repair History and Vendor Information; Work Sampling; and Identification and Control. Based upon a graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

  17. Tonopah Test Range Post-Closure Inspection Annual Report, Tonopah Test Range, Nevada, Calendar Year 2002

    SciTech Connect (OSTI)

    R. B. Jackson

    2003-08-01

    This Post-Closure Inspection Annual Report provides documentation of the semiannual inspections conducted at the following Corrective Action Units (CAU)s: CAU 400: Bomblet Pit and Five Points Landfill; CAU 404: Roller Coaster Lagoons and Trench; CAU 407: Roller Coaster RadSafe Area; CAU 424: Area 3 Landfill Complexes; CAU 426: Cactus Spring Waste Trenches; CAU 427: Septic Waste Systems 2, 6; and CAU 453: Area 9 UXO Landfill, all located at the Tonopah Test Range, Nevada. Post-closure inspections are not required at CAU 400 but are conducted to monitor vegetation and fencing at the site. Site inspections were conducted in May and November 2002. All site inspections were made after Nevada Division of Environmental Protection (NDEP) approval of the appropriate Closure Report (CR), excluding CAU 400 which did not require a CR, and were conducted in accordance with the Post-Closure Inspection Plans in the NDEP-approved CRs. Post-closure inspections conducted during 2002 identified several areas requiring maintenance/repairs. Maintenance work and proposed additional monitoring are included in the appropriate section for each CAU. This report includes copies of the Post-Closure Inspection Plans, Post-Closure Inspection Checklists, copies of the field notes, photographs, and the Post-Closure Vegetative Monitoring Report. The Post-Closure Inspection Plan for each CAU is located in Attachment A. Post-Closure Inspection Checklists are in Attachment B. Copies of the field notes from each inspection are included in Attachment C. Attachment D consists of the photographic logs and photographs of the sites. The post-closure vegetative monitoring report for calendar year 2002 is included in Attachment E.

  18. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2014

    SciTech Connect (OSTI)

    Silvas, A. J.; Lantow, Tiffany A.

    2015-03-25

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2014 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Photographs taken during inspections are included in Appendix D. The annual post-closure inspections were conducted on May 28, 2014. Maintenance was required at CAU 407. Animal burrows were backfilled and erosion repairs were performed. Vegetation monitoring was performed at CAU 407 in June 2014. The vegetation monitoring report is included in Appendix E.

  19. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2013

    SciTech Connect (OSTI)

    Silvas, A. J.

    2014-03-03

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2013 and includes inspection and repair activities completed at the following CAUs: • CAU 400: Bomblet Pit and Five Points Landfill (TTR) • CAU 407: Roller Coaster RadSafe Area (TTR) • CAU 424: Area 3 Landfill Complexes (TTR) • CAU 453: Area 9 UXO Landfill (TTR) • CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. Photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted on May 14, 2013. Maintenance was performed at CAU 400, CAU 424, and CAU 453. At CAU 400, animal burrows were backfilled. At CAU 424, erosion repairs were completed at Landfill Cell A3-3, subsidence was repaired at Landfill Cell A3-4, and additional lava rock was placed in high-traffic areas to mark the locations of the surface grade monuments at Landfill Cell A3-3 and Landfill Cell A3-8. At CAU 453, two areas of subsidence were repaired and animal burrows were backfilled. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2013. The vegetation monitoring report is included in Appendix F.

  20. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2009

    SciTech Connect (OSTI)

    NSTec Environmental Restoration

    2010-05-28

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2009 and includes inspection and repair activities completed at the following seven CAUs: · CAU 400: Bomblet Pit and Five Points Landfill (TTR) · CAU 407: Roller Coaster RadSafe Area (TTR) · CAU 424: Area 3 Landfill Complexes (TTR) · CAU 426: Cactus Spring Waste Trenches (TTR) · CAU 453: Area 9 UXO Landfill (TTR) · CAU 484: Surface Debris, Waste Sites, and Burn Area (TTR) · CAU 487: Thunderwell Site (TTR) The annual post-closure inspections were conducted May 5–6, 2009. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2009, and the vegetation monitoring report is included in Attachment F. Maintenance was performed at CAU 453. Animal burrows observed during the annual inspection were backfilled, and a depression was restored to grade on June 25, 2009. Post-closure site inspections should continue as scheduled. Vegetation survey inspections have been conducted annually at CAUs 400, 404, 407, and 426. Discontinuation of vegetation surveys is recommended at the CAU 400 Bomblet Pit and CAU 426, which have been successfully revegetated. Discontinuation of vegetation surveys is also recommended at CAU 404, which has been changed to an administrative closure with no inspections required. Vegetation monitoring at the CAU 400 Five Points Landfill and CAU 407 should continue.

  1. Post-Closure Inspection Report for the Tonopah Test Range, Nevada

    SciTech Connect (OSTI)

    NSTec Environmental Restoration

    2007-06-01

    This report provides the results of the semiannual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2006 and includes inspection and repair activities completed at the following nine CAUs: CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 404: Roller Coaster Lagoons and Trench (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 426: Cactus Spring Waste Trenches (TTR); CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR). Post-closure inspections were conducted on May 9, 2006, May 31, 2006, and November 15, 2006. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2006, and the vegetation monitoring report is included in Attachment F. Maintenance and/or repairs were performed at CAU 400, CAU 407, CAU 426, CAU 453, and CAU 487 in 2006. During the May inspection of CAU 400, it was identified that the east and west sections of chickenwire fencing beyond the standard fencing were damaged; they were repaired in June 2006. Also in June 2006, the southeast corner fence post and one warning sign at CAU 407 were reinforced and reattached, the perimeter fencing adjacent to the gate at CAU 426 was tightened, and large animal burrows observed at CAU 453 were backfilled. Cracking observed in three monuments at CAU 487 was repaired using sealant during the May 9, 2006, inspection. At this time, the TTR post-closure site inspections should continue as scheduled. Any potential problem areas previously identified (e.g., areas of erosion, subsidence) should be monitored closely, and periodic vegetation surveys of the vegetated covers should continue.

  2. No maintenance -- no energy efficiency

    SciTech Connect (OSTI)

    Szydlowski, R.F.; Schliesing, J.S.; Winiarski, D.W.

    1994-12-01

    Field investigations illustrate that it is not realistic to expect new high-tech equipment to function for a full life expectancy at high efficiency without significant operations and maintenance (O&M). A simple walk through inspection of most buildings reveals extensive equipment that is being operated on manual override, is incorrectly adjusted and operating inefficiently, or is simply inoperative. This point is illustrated with two examples at Robins Air Force Base, Georgia. The first describes development of a comprehensive, base-wide, steam trap maintenance program. The second describes a measured evaluation from a typical office building. The objective of both examples was to assess the importance of proper O&M. The proposed ``O&M First`` philosophy will result in more efficient building HVAC operation, provide improved services to the building occupants, and reduce energy consumption and unscheduled equipment repair/replacement. Implementation of a comprehensive O&M program will result in a 15--25% energy savings. The O&M foundation that is established will allow other energy conservation activities such is demand side management or energy management and control systems, to achieve and maintain their expected energy savings.

  3. 2004 Annual Inspection for the

    Office of Legacy Management (LM)

    for the Parkersburg, West Virginia, Nuclear Waste Policy Act Section 151(c) Disposal Site Summary The Parkersburg, West Virginia, Site was inspected on October 16, 2008, to confirm the integrity of visible features and to determine the need, if any, for maintenance, additional inspections, or monitoring. Results of the inspection conclude that the site is in excellent condition. Vegetation control activities (mow and spray) have been effective in reducing the populations of weed species present

  4. Development and validation of bonded composite doubler repairs for commercial aircraft.

    SciTech Connect (OSTI)

    Roach, Dennis Patrick; Rackow, Kirk A.

    2007-07-01

    A typical aircraft can experience over 2,000 fatigue cycles (cabin pressurizations) and even greater flight hours in a single year. An unavoidable by-product of aircraft use is that crack, impact, and corrosion flaws develop throughout the aircraft's skin and substructure elements. Economic barriers to the purchase of new aircraft have placed even greater demands on efficient and safe repair methods. The use of bonded composite doublers offers the airframe manufacturers and aircraft maintenance facilities a cost effective method to safely extend the lives of their aircraft. Instead of riveting multiple steel or aluminum plates to facilitate an aircraft repair, it is now possible to bond a single Boron-Epoxy composite doubler to the damaged structure. The FAA's Airworthiness Assurance Center at Sandia National Labs (AANC), Boeing, and Federal Express completed a pilot program to validate and introduce composite doubler repair technology to the U.S. commercial aircraft industry. This project focused on repair of DC-10 fuselage structure and its primary goal was to demonstrate routine use of this repair technology using niche applications that streamline the design-to-installation process. As composite doubler repairs gradually appear in the commercial aircraft arena, successful flight operation data is being accumulated. These commercial aircraft repairs are not only demonstrating the engineering and economic advantages of composite doubler technology but they are also establishing the ability of commercial maintenance depots to safely adopt this repair technique. This report presents the array of engineering activities that were completed in order to make this technology available for widespread commercial aircraft use. Focused laboratory testing was conducted to compliment the field data and to address specific issues regarding damage tolerance and flaw growth in composite doubler repairs. Fatigue and strength tests were performed on a simulated wing repair using a substandard design and a flawed installation. In addition, the new Sol-Gel surface preparation technique was evaluated. Fatigue coupon tests produced Sol-Gel results that could be compared with a large performance database from conventional, riveted repairs. It was demonstrated that not only can composite doublers perform well in severe off-design conditions (low doubler stiffness and presence of defects in doubler installation) but that the Sol-Gel surface preparation technique is easier and quicker to carry out while still producing optimum bonding properties. Nondestructive inspection (NDI) methods were developed so that the potential for disbond and delamination growth could be monitored and crack growth mitigation could be quantified. The NDI methods were validated using full-scale test articles and the FedEx aircraft installations. It was demonstrated that specialized NDI techniques can detect flaws in composite doubler installations before they reach critical size. Probability of Detection studies were integrated into the FedEx training in order to quantify the ability of aircraft maintenance depots to properly monitor these repairs. In addition, Boeing Structural Repair and Nondestructive Testing Manuals were modified to include composite doubler repair and inspection procedures. This report presents the results from the FedEx Pilot Program that involved installation and surveillance of numerous repairs on operating aircraft. Results from critical NDI evaluations are reported in light of damage tolerance assessments for bonded composite doublers. This work has produced significant interest from airlines and aircraft manufacturers. The successful Pilot Program produced flight performance history to establish the durability of bonded composite patches as a permanent repair on commercial aircraft structures. This report discusses both the laboratory data and Pilot Program results from repair installations on operating aircraft to introduce composite doubler repairs into mainstream commercial aircraft use.

  5. DOE/EA-2008: Colorado River Storage Project Programmatic Operations and Maintenance Project; Coconino, Maricopa, Navajo, and Yavapai Counties (Arizona) and San Juan County (Utah)

    Broader source: Energy.gov [DOE]

    Western Area Power Administration is preparing an EA that assesses the potential environmental impacts of Western’s programmatic operations and management (O&M) process and an integrated vegetation management (IVM) program on the Colorado River Storage Project System. O&M activities would consist of aerial and ground patrols, regular and preventive maintenance, inspections and repairs, and road repair. The IVM program would remove vegetation to protect facilities from fire, control the spread of noxious weeds to protect environmental quality, establish and maintain stable, low-growing plant communities in the ROW, and activities for public and worker safety around transmission lines and other facilities.

  6. EA-2008: Colorado River Storage Project Programmatic Operations and Maintenance Project; Coconino, Maricopa, Navajo, and Yavapai Counties (Arizona) and San Juan County (Utah)

    Broader source: Energy.gov [DOE]

    Western Area Power Administration is preparing an EA that assesses the potential environmental impacts of Western’s programmatic operations and management (O&M) process and an integrated vegetation management (IVM) program on the Colorado River Storage Project System. O&M activities would consist of aerial and ground patrols, regular and preventive maintenance, inspections and repairs, and road repair. The IVM program would remove vegetation to protect facilities from fire, control the spread of noxious weeds to protect environmental quality, establish and maintain stable, low-growing plant communities in the ROW, and activities for public and worker safety around transmission lines and other facilities.

  7. 2003 Annual Inspection of the Weldon Spring Site

    Office of Legacy Management (LM)

    Office of Legacy Management 2003 Annual Inspection - Weldon Spring, Missouri February 2004 Page 1 2003 Annual Inspection of the Weldon Spring Site St. Charles, Missouri Summary The Weldon Spring Site, located in St. Charles, Missouri, was inspected on October 28 and 29, 2003. This was the first annual surveillance and maintenance inspection at the Weldon Spring site and serves as a baseline for future inspections. The inspection was conducted in accordance with the draft Long-Term Surveillance

  8. Web Maintenance

    Broader source: Energy.gov [DOE]

    EERE expects its offices to review and maintain their online content on an ongoing basis throughout the year. This includes two kinds of maintenance: technical maintenance and content maintenance....

  9. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2007

    SciTech Connect (OSTI)

    NSTec Environmental Restoration

    2008-06-01

    This report provides the results of the semiannual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2007 and includes inspection and repair activities completed at the following nine CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 404: Roller Coaster Lagoons and Trench (TTR); (3) CAU 407: Roller Coaster RadSafe Area (TTR); (4) CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR); (5) CAU 424: Area 3 Landfill Complexes (TTR); (6) CAU 426: Cactus Spring Waste Trenches (TTR); (7) CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR); (8) CAU 453: Area 9 UXO Landfill (TTR); and (9) CAU 487: Thunderwell Site (TTR). In a letter from the Nevada Division of Environmental Protection (NDEP) dated December 5, 2006, NDEP concurred with the request to reduce the frequency of post-closure inspections of CAUs at TTR to an annual frequency. This letter is included in Attachment B. Post-closure inspections were conducted on May 15-16, 2007. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in May 2007, and the vegetation monitoring report is included in Attachment F. Maintenance and/or repairs were performed at CAU 453. Animal burrows observed during the annual inspection at CAU 453 were backfilled on August 1, 2007. At this time, the TTR post-closure site inspections should continue as scheduled. Any potential problem areas previously identified (e.g., areas of erosion, subsidence) should be monitored closely, and periodic vegetation surveys of the vegetated covers should continue.

  10. Thermographic inspection of massive structures

    SciTech Connect (OSTI)

    Renshaw, Jeremy B.; Guimaraes, Maria; Scott, David B.

    2014-02-18

    Nondestructive Evaluation of concrete structures is a growing concern for the nuclear industry as well as for many other industries. As critical concrete components continue to age, the ability to assess the health and suitability for continued service has become a key consideration. In some cases, repair of these structures is difficult and expensive, while replacement is prohibitively expensive or, in some cases, not feasible. Therefore, the ability to inspect these key assets is a primary concern, especially in the nuclear industry. Due to the large size of containment buildings, cooling towers, and other large concrete assets, the ability to rapidly inspect for defects of concern is very desirable. Thermographic inspection appears to have the required ability to rapidly inspect large structures to ascertain the location and size of many of the defects of concern. This ability was demonstrated by performing a thermographic inspection of a large concrete dam in 2 days.

  11. INSPECTION REPORT

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Worker Safety and Health at the Y-12 National Security Complex OAI-L-16-06 December 2015 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 December 22, 2015 MEMORANDUM FOR THE MANAGER, NATIONAL NUCLEAR SECURITY ADMINSTRATION PRODUCTION OFFICE FROM: April G. Stephenson Assistant Inspector General for Inspections Office of Inspector General SUBJECT: INFORMATION: Inspection Report on "Worker Safety and Health at the

  12. 2003 Annual Inspection of the Weldon Spring, Missouri, Site

    Office of Legacy Management (LM)

    4 Annual Inspection - Weldon Spring, Missouri January 2005 Page 1 2004 Annual Inspection Report for the Weldon Spring, Missouri, Site Summary The Weldon Spring Site, located in St. Charles, Missouri, was inspected on November 17 and 18, 2004. The inspection was conducted in accordance with the Draft-Final Long-Term Surveillance and Maintenance Plan for the Weldon Spring, Missouri, Site (August 2004), and associated inspection checklist. Representatives from the U.S. Environmental Protection

  13. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2011

    SciTech Connect (OSTI)

    NSTec Environmental Restoration

    2012-02-21

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2011 and includes inspection and repair activities completed at the following CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 453: Area 9 UXO Landfill (TTR); and (5) CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Appendix B. The inspection checklists are included in Appendix C, field notes are included in Appendix D, and photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted May 3 and 4, 2011. Maintenance was performed at CAU 424, CAU 453, and CAU 487. At CAU 424, two surface grade monuments at Landfill Cell A3-3 could not be located during the inspection. The two monuments were located and marked with lava rock on July 13, 2011. At CAU 453, there was evidence of animal burrowing. Animal burrows were backfilled on July 13, 2011. At CAU 487, one use restriction warning sign was missing, and wording was faded on the remaining signs. A large animal burrow was also present. The signs were replaced, and the animal burrow was backfilled on July 12, 2011. As a best management practice, the use restriction warning signs at CAU 407 were replaced with standard Federal Facility Agreement and Consent Order signs on July 13, 2011. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2011, and the vegetation monitoring report is included in Appendix F.

  14. Appendix B Landfill Inspection Forms and Survey Data

    Office of Legacy Management (LM)

    Original Landfill January 2011 Monthly Inspection - Attachment 1 The January inspection of the OLF was completed on January 28. The cover was fairly dry at the time of the inspection as precipitation has been scarce during the entire month. No new cracks were observed during this inspection. The locations where the previously reported cracks had been filled and compacted were also still in good repair. Project Location Updates Berm 1 and 7 continue to look good with no new slumping or cracking

  15. Bearing repair services offer a cost-effective alternative to expensive replacement

    SciTech Connect (OSTI)

    2009-02-15

    The article, based on a presentation during MINExpo 2008, explains how advancement is bearing design, material, maintenance and repair methods have greatly improved the potential for and popularity of bearing repair as an effective way to extend bearing life. The Trinken Co. offers a variety of service options including repair, recertification, reconditioning and remanufacturing. Benefits of a quality repair program are outlined. 2 photos.

  16. Microsoft Word - Appendix E - Erosion Control M&M Inspection Procedure.docx

    Office of Legacy Management (LM)

    Rocky Flats, Colorado, Site Erosion Control Monitoring and Maintenance Inspection Procedure This page intentionally left blank LMS/RFS/S04532 Rocky Flats, Colorado, Site Erosion Control Monitoring and Maintenance Inspection Procedure April 2012 This page intentionally left blank U.S. Department of Energy Rocky Flats Erosion Control Monitoring and Maintenance Inspection Procedure April 2012 Doc. No. S04532 Page 1 1.0 Introduction The Erosion Control Plan for Rocky Flats Property Central Operable

  17. Turbine repair process, repaired coating, and repaired turbine component

    DOE Patents [OSTI]

    Das, Rupak; Delvaux, John McConnell; Garcia-Crespo, Andres Jose

    2015-11-03

    A turbine repair process, a repaired coating, and a repaired turbine component are disclosed. The turbine repair process includes providing a turbine component having a higher-pressure region and a lower-pressure region, introducing particles into the higher-pressure region, and at least partially repairing an opening between the higher-pressure region and the lower-pressure region with at least one of the particles to form a repaired turbine component. The repaired coating includes a silicon material, a ceramic matrix composite material, and a repaired region having the silicon material deposited on and surrounded by the ceramic matrix composite material. The repaired turbine component a ceramic matrix composite layer and a repaired region having silicon material deposited on and surrounded by the ceramic matrix composite material.

  18. Motor Repair Tech Brief

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Motor Repair Tech Brief u Why do motors fail? u When should you repair instead of replace? u How can reliability and efficiency be assured in a repair? This Tech Brief applies to: Random Wound Induction Motors Designs A-E Acknowledgements The following series of Repair Documents-The Service Center Evaluation Guide, Selected Bibliography on Electric Motor Repair, Model Repair Specifications for Low Voltage Motors, and Motor Repair Tech Brief- were produced by the U.S. Department of Energy's

  19. F Reactor Inspection

    ScienceCinema (OSTI)

    Grindstaff, Keith; Hathaway, Boyd; Wilson, Mike

    2014-11-24

    Workers from Mission Support Alliance, LLC., removed the welds around the steel door of the F Reactor before stepping inside the reactor to complete its periodic inspection. This is the first time the Department of Energy (DOE) has had the reactor open since 2008. The F Reactor is one of nine reactors along the Columbia River at the Department's Hanford Site in southeastern Washington State, where environmental cleanup has been ongoing since 1989. As part of the Tri-Party Agreement, the Department completes surveillance and maintenance activities of cocooned reactors periodically to evaluate the structural integrity of the safe storage enclosure and to ensure confinement of any remaining hazardous materials. "This entry marks a transition of sorts because the Hanford Long-Term Stewardship Program, for the first time, was responsible for conducting the entry and surveillance and maintenance activities," said Keith Grindstaff, Energy Department Long-Term Stewardship Program Manager. "As the River Corridor cleanup work is completed and transitioned to long-term stewardship, our program will manage any on-going requirements."

  20. Genepool Quarterly Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Genepool Quarterly Maintenance Genepool Quarterly Maintenance November 7, 2012 by Kirsten Fagnan The Genepool cluster will be offline for maintenance next Tuesday, November 13th...

  1. INTERNAL REPAIR OF PIPELINES

    SciTech Connect (OSTI)

    Robin Gordon; Bill Bruce; Nancy Porter; Mike Sullivan; Chris Neary

    2003-05-01

    The two broad categories of deposited weld metal repair and fiber-reinforced composite repair technologies were reviewed for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Preliminary test programs were developed for both deposited weld metal repairs and for fiber-reinforced composite repair. To date, all of the experimental work pertaining to the evaluation of potential repair methods has focused on fiber-reinforced composite repairs. Hydrostatic testing was also conducted on four pipeline sections with simulated corrosion damage: two with composite liners and two without.

  2. Proceedings: 1996 EPRI fossil plant maintenance conference

    SciTech Connect (OSTI)

    1996-07-01

    EPRI sponsors many conferences and workshops addressing various aspects of fossil power plant maintenance. Featured have been topics such as inspection methods, life assessment techniques, overhaul planning, predictive maintenance programs, thermography, vibration monitoring, welding, and component-specific events on boilers, condensers, feedwater heaters, generators, and turbines. The 1996 EPRI Fossil Plant Maintenance Conference-held July 29-August 1, 1996, in Baltimore, Maryland-reached a wider audience by providing a forum to discuss all aspects of fossil plant maintenance. Knowledgeable industry personnel exchanged information on state-of-the-art technology; identified major unresolved problems; and helped establish priorities for further research, development, and demonstration in fossil plant maintenance. This document presents report presented at the conference. Individual papers have been processed separately for the United States Department of Energy databases.

  3. Emerging nondestructive inspection methods for aging aircraft

    SciTech Connect (OSTI)

    Beattie, A; Dahlke, L; Gieske, J

    1994-01-01

    This report identifies and describes emerging nondestructive inspection (NDI) methods that can potentially be used to inspect commercial transport and commuter aircraft for structural damage. The nine categories of emerging NDI techniques are: acoustic emission, x-ray computed tomography, backscatter radiation, reverse geometry x-ray, advanced electromagnetics, including magnetooptic imaging and advanced eddy current techniques, coherent optics, advanced ultrasonics, advanced visual, and infrared thermography. The physical principles, generalized performance characteristics, and typical applications associated with each method are described. In addition, aircraft inspection applications are discussed along with the associated technical considerations. Finally, the status of each technique is presented, with a discussion on when it may be available for use in actual aircraft maintenance programs. It should be noted that this is a companion document to DOT/FAA/CT-91/5, Current Nondestructive Inspection Methods for Aging Aircraft.

  4. Inspection Report: IG-0544

    Office of Energy Efficiency and Renewable Energy (EERE)

    Inspection of the Accountability and Control of Sealed Radioactive Sources at Selected Department of Energy Sites

  5. Steam trap maintenance management saves $180,000 annually

    SciTech Connect (OSTI)

    Franks, F.C.; Wickersham, C.

    1985-12-01

    The Reichhold Chemical plant is located in Elizabeth, NJ. At this location, the cost of steam had skyrocketed to $5.30 per million Btu. The plant has 600 steam traps manufactured by ten different companies. Some 17 different models of traps are used with 33 piping configurations. There are five different operating pressures throughout the plant ranging from 15-175 psig, including 30, 65, and 120 psig. Five different applications of steam usage can be broken down as follows: steam tracing (56%); drip (21%); comfort heating (18%); tank coil (4%); and process (1%). In the fall of 1983, the annual yearly inspection of steam traps was supplanted with an independent trap survey service, specializing in detecting the malfunctioning of various types of steam traps. The basic program included location and tagging of all steam traps; survey and inspection of steam trap population; development of a trap map; and full computer analysis of collected data. It was determined that approximately 3919 lb/hr of steam could be saved by repairing the failed open traps and implementing the report's recommendations. There were also benefits from fixing the failed closed traps which were out of service at the time of the survey. These traps do not allow the flow of steam or condensate to pass through the orifice. This condition causes condensate to back up and reduce efficiency. The maintenance management has been pleased with the results and recommendations of the program. It has provided them with a complete inventory and status report of the 600 traps plantwide. It saved $180,000 over the previous year in energy expenditures. This was the most important contribution in lowering the plant energy costs.

  6. Inspection Report: IG-0378

    Office of Energy Efficiency and Renewable Energy (EERE)

    Report on Follow-up Inspection of the Double Funding of Security for Special Nuclear Material at Richland Operations

  7. Inspection Report: IG-0742 | Department of Energy

    Energy Savers [EERE]

    2 Inspection Report: IG-0742 October 11, 2006 Protective Force Property Management at Lawrence Livermore National Laboratory The Department of Energy's (DOE's) Lawrence Livermore AND OBJECTIVE National Laboratory (LLNL) supports the maintenance of a safe, secure, and reliable nuclear weapon stockpile and provides expertise toward the prevention of the proliferation of weapons of mass destruction and terrorist attacks. LLNL is a National Nuclear Security Administration (NNSA) site operated by the

  8. SUMMARY INSPECTION REPORT

    Energy Savers [EERE]

    INSPECTION REPORT Alleged Fraud, Waste, Abuse and Mismanagement at a Department of Energy Site Office DOE/IG-0921* *An OUO Version of this report was issued under the same number September 2014 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 September 30, 2014 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Summary of Inspection Report on "Alleged Fraud, Waste,

  9. Inspection Report: IG-0821

    Office of Environmental Management (EM)

    Inspection Report Fire Suppression and Related Services at Los Alamos National Laboratory DOE/IG-0821 September 2009 U.S. Department of Energy Office of Inspector General Office of Inspections Department of Energy Washington, DC 20585 September 11, 2009 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Inspection Report on "Fire Suppression and Related Services at Los Alamos National Laboratory" BACKGROUND The Department of Energy's (DOE's)

  10. Inspection Report: IG-0746

    Office of Environmental Management (EM)

    l nspector General Office of Inspections and Special Inquiries Inspection Report Work Packages for Site Support Service; at Los Alamos National Laboratory Department of Energy Washington, DC 20585 November 29, 2006 MEMORANDUM FOR TI38 S E C m U R Y FROM: h p Gregor - . riedman Inspector General SUBJECT: INFORMATION: Inspection Report on "Work Packages for Site Support Services at Los Alalnos National Laboratory" The Department of Energy's Los Alarnos National Laboratory (LANL) enhances

  11. SNL Researchers Assess Wind Turbine Blade Inspection and Repair...

    Broader source: Energy.gov (indexed) [DOE]

    ... Teaming Up to Apply Advanced Manufacturing Methods to Wind Turbine Production Using its fiberglass technology expertise and a grant from the Energy Department's State Energy ...

  12. Inspect and Repair Steam Traps, Energy Tips: STEAM, Steam Tip...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    leaking traps should account for less than 5% of the trap population. If your steam distribution system includes more than 500 traps, a steam trap survey will probably reveal...

  13. Optical fiber inspection system

    DOE Patents [OSTI]

    Moore, Francis W. (Richland, WA)

    1987-01-01

    A remote optical inspection system including an inspection head. The inspection head has a passageway through which pellets or other objects are passed. A window is provided along the passageway through which light is beamed against the objects being inspected. A plurality of lens assemblies are arranged about the window so that reflected light can be gathered and transferred to a plurality of coherent optical fiber light guides. The light guides transfer the light images to a television or other image transducer which converts the optical images into a representative electronic signal. The electronic signal can then be displayed on a signal viewer such as a television monitor for inspection by a person. A staging means can be used to support the objects for viewing through the window. Routing means can be used to direct inspected objects into appropriate exit passages for accepted or rejected objects. The inspected objects are advantageously fed in a singular manner to the staging means and routing means. The inspection system is advantageously used in an enclosure when toxic or hazardous materials are being inspected.

  14. Optical fiber inspection system

    DOE Patents [OSTI]

    Moore, F.W.

    1985-04-05

    A remote optical inspection system including an inspection head. The inspection head has a passageway through which pellets or other objects are passed. A window is provided along the passageway through which light is beamed against the objects being inspected. A plurality of lens assemblies are arranged about the window so that reflected light can be gathered and transferred to a plurality of coherent optical fiber light guides. The light guides transfer the light images to a television or other image transducer which converts the optical images into a representative electronic signal. The electronic signal can then be displayed on a signal viewer such as a television monitor for inspection by a person. A staging means can be used to support the objects for viewing through the window. Routing means can be used to direct inspected objects into appropriate exit passages for accepted or rejected objects. The inspected objects are advantageously fed in a singular manner to the staging means and routing means. The inspection system is advantageously used in an enclosure when toxic or hazardous materials are being inspected. 10 figs.

  15. Inspection Report: IG-0557 | Department of Energy

    Office of Environmental Management (EM)

    57 Inspection Report: IG-0557 June 1, 2002 Inspection of Department of Energy Fresh Pursuit Policies and Practices PDF icon Inspection Report: IG-0557 More Documents & Publications Inspection Report: IG-0563 Inspection Report: IG-0534 Inspection Report: IG-0633

  16. Post-Deactivation Surveillance and Maintenance Planning | Department of

    Energy Savers [EERE]

    Energy Post-Deactivation Surveillance and Maintenance Planning Post-Deactivation Surveillance and Maintenance Planning One of the key elements of end-point planning is knowing what the post-deactivation S&M activities will be so that conditions can be established to support them. The post-deactivation S&M plan specifies the surveillance, inspection, and maintenance of the facility in the deactivated state. It should address the activities, the locations in which they will be

  17. Condition Assessment Survey (CAS) Program. Deficiency standards and inspections methods manual: Volume 2, 0.02 Substructure

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    System information is given for asset determinant factor/CAS repair codes/CAS cost factors; guide sheet tool & material listing; testing methods; inspection frequency; standard system design life tables; system work breakdown structure; and general system/material data. System assembly/component deficiencies and inspection methods are given for slabs-on-grade, columns, and column fireproofing.

  18. Camera Inspection Arm for Boiling Water Reactors - 13330

    SciTech Connect (OSTI)

    Martin, Scott; Rood, Marc

    2013-07-01

    Boiling Water Reactor (BWR) outage maintenance tasks can be time-consuming and hazardous. Reactor facilities are continuously looking for quicker, safer, and more effective methods of performing routine inspection during these outages. In 2011, S.A. Technology (SAT) was approached by Energy Northwest to provide a remote system capable of increasing efficiencies related to Reactor Pressure Vessel (RPV) internal inspection activities. The specific intent of the system discussed was to inspect recirculation jet pumps in a manner that did not require manual tooling, and could be performed independently of other ongoing inspection activities. In 2012, SAT developed a compact, remote, camera inspection arm to create a safer, more efficient outage environment. This arm incorporates a compact and lightweight design along with the innovative use of bi-stable composite tubes to provide a six-degree of freedom inspection tool capable of reducing dose uptake, reducing crew size, and reducing the overall critical path for jet pump inspections. The prototype camera inspection arm unit is scheduled for final testing in early 2013 in preparation for the Columbia Generating Station refueling outage in the spring of 2013. (authors)

  19. PREVENTIVE MAINTENANCE LEADS TO EARLY DETECTION AT WIPP SITE

    Broader source: Energy.gov [DOE]

    Carlsbard, NM - The effectiveness of the Waste Isolation Pilot Plant’s (WIPP) preventive maintenance program paid huge dividends late last month when an issue with a steel rope on the project’s waste conveyance was identified during a routine inspection.

  20. INTERNAL REPAIR OF PIPELINES

    SciTech Connect (OSTI)

    Bill Bruce; Nancy Porter; George Ritter; Matt Boring; Mark Lozev; Ian Harris; Bill Mohr; Dennis Harwig; Robin Gordon; Chris Neary; Mike Sullivan

    2005-07-20

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is only marginally effective at restoring the pressure containing capabilities of pipelines. Failure pressures for larger diameter pipe repaired with a semi-circular patch of carbon fiber-reinforced composite lines were also marginally greater than that of a pipe section with un-repaired simulated damage without a liner. These results indicate that fiber reinforced composite liners have the potential to increase the burst pressure of pipe sections with external damage Carbon fiber based liners are viewed as more promising than glass fiber based liners because of the potential for more closely matching the mechanical properties of steel. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. In lieu of a field installation on an abandoned pipeline, a preliminary nondestructive testing protocol is being developed to determine the success or failure of the fiber-reinforced liner pipeline repairs. Optimization and validation activities for carbon-fiber repair methods are ongoing.

  1. Section 21: Inspections

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Inspections (40 CFR § 194.21) United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico Compliance Recertification Application 2014 Inspections (40 CFR § 194.21) Table of Contents 21.0 Inspections (40 CFR § 194.21) 21.1 Requirements 21.2 Background 21.3 1998 Certification Decision 21.4 Changes in the CRA-2004 21.5 EPA's Evaluation of Compliance for the 2004 Recertification 21.6 Changes or New Information Between the CRA-2004 and the CRA-2009

  2. INTERNAL REPAIR OF PIPELINES

    SciTech Connect (OSTI)

    Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; George Ritter; Bill Mohr; Matt Boring; Nancy Porter; Mike Sullivan; Chris Neary

    2004-12-31

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is only marginally effective at restoring the pressure containing capabilities of pipelines. Failure pressures for larger diameter pipe repaired with a semi-circular patch of carbon fiber-reinforced composite lines were also marginally greater than that of a pipe section with un-repaired simulated damage without a liner. These results indicate that fiber reinforced composite liners have the potential to increase the burst pressure of pipe sections with external damage Carbon fiber based liners are viewed as more promising than glass fiber based liners because of the potential for more closely matching the mechanical properties of steel. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. The first round of optimization and validation activities for carbon-fiber repairs are complete. Development of a comprehensive test plan for this process is recommended for use in the field trial portion of this program.

  3. Apparatus for inspecting piping

    DOE Patents [OSTI]

    Zollingger, W. Thor (Martinez, GA); Appel, D. Keith (Aiken, SC); Park, Larry R. (Raleigh, NC)

    1995-01-01

    An inspection rabbit for inspecting piping systems having severe bends therein. The rabbit consists of a flexible, modular body containing a miniaturized eddy current inspection probe, a self-contained power supply for proper operation of the rabbit, an outer surface that allows ease of movement through piping systems and means for transmitting data generated by the inspection device. The body is preferably made of flexible polyvinyl chloride (PVC) tubing or, alternatively, silicone rubber with a shrink wrapping of polytetrafluoroethylene (TEFLON.RTM.). The body is formed to contain the power supply, preferably a plurality of batteries, and a spool of communication wire that connects to a data processing computer external to the piping system.

  4. Apparatus for inspecting piping

    DOE Patents [OSTI]

    Zollingger, W.T.; Appel, D.K.; Park, L.R.

    1995-03-21

    An inspection rabbit is described for inspecting piping systems having severe bends therein. The rabbit consists of a flexible, modular body containing a miniaturized eddy current inspection probe, a self-contained power supply for proper operation of the rabbit, an outer surface that allows ease of movement through piping systems and means for transmitting data generated by the inspection device. The body is preferably made of flexible polyvinyl chloride (PVC) tubing or, alternatively, silicone rubber with a shrink wrapping of polytetrafluoroethylene (TEFLON{trademark}). The body is formed to contain the power supply, preferably a plurality of batteries, and a spool of communication wire that connects to a data processing computer external to the piping system. 6 figures.

  5. INTERNAL REPAIR OF PIPELINES

    SciTech Connect (OSTI)

    Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; George Ritter; Bill Mohr; Matt Boring; Nancy Porter; Mike Sullivan; Chris Neary

    2004-08-17

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is only marginally effective at restoring the pressure containing capabilities of pipelines. Failure pressures for larger diameter pipe repaired with a semi-circular patch of carbon fiber-reinforced composite lines were also marginally greater than that of a pipe section with un-repaired simulated damage without a liner. These results indicate that fiber reinforced composite liners have the potential to increase the burst pressure of pipe sections with external damage Carbon fiber based liners are viewed as more promising than glass fiber based liners because of the potential for more closely matching the mechanical properties of steel. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. Development of a comprehensive test plan for this process is recommended for use in the field trial portion of this program.

  6. Inspection Report: IG-0745

    Office of Environmental Management (EM)

    and Special Inquiries Inspection Report Material Control and Accountability at Lawrence Livermore National Laboratory Department of Energy Washington, DC 20585 November 15, 2006 MEMORANDUM FOR TH FROM: C 4 z % z & r Inspector General SUBJECT: INFORMATION: Inspection Report on "Material Control and Accountability at Lawrence Livermore National Laboratory" BACKGROUND Lawrence Livermore National Laboratory supports the Department of Energy's core mission of maintaining a safe, secure,

  7. Service and Repair Work

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Service and Repair Work Whenever on-site service or repair work needs to be done, a Procurement Work Sheet (PWS) must be completed, and possibly an IWS, authorized and released. PWS is required for service work even if there are no apparent hazards. PWS is required for work in Jupiter Laser Facility even if you have a PWS for service/repairs in another location. To complete a PWS for service work in Jupiter Laser Facility, please contact Sean Holte (2-3905, pager #05312). Notify Brent Stuart and

  8. INTERNAL REPAIR OF PIPELINES

    SciTech Connect (OSTI)

    Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; Nancy Porter; Mike Sullivan; Chris Neary

    2004-04-12

    The two broad categories of deposited weld metal repair and fiber-reinforced composite liner repair technologies were reviewed for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Preliminary test programs were developed for both deposited weld metal repair and for fiber-reinforced composite liner repair. Evaluation trials have been conducted using a modified fiber-reinforced composite liner provided by RolaTube and pipe sections without liners. All pipe section specimens failed in areas of simulated damage. Pipe sections containing fiber-reinforced composite liners failed at pressures marginally greater than the pipe sections without liners. The next step is to evaluate a liner material with a modulus of elasticity approximately 95% of the modulus of elasticity for steel. Preliminary welding parameters were developed for deposited weld metal repair in preparation of the receipt of Pacific Gas & Electric's internal pipeline welding repair system (that was designed specifically for 559 mm (22 in.) diameter pipe) and the receipt of 559 mm (22 in.) pipe sections from Panhandle Eastern. The next steps are to transfer welding parameters to the PG&E system and to pressure test repaired pipe sections to failure. A survey of pipeline operators was conducted to better understand the needs and performance requirements of the natural gas transmission industry regarding internal repair. Completed surveys contained the following principal conclusions: (1) Use of internal weld repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling (HDD) when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) Pipe diameter sizes range from 50.8 mm (2 in.) through 1,219.2 mm (48 in.). The most common size range for 80% to 90% of operators surveyed is 508 mm to 762 mm (20 in. to 30 in.), with 95% using 558.8 mm (22 in.) pipe. An evaluation of potential repair methods clearly indicates that the project should continue to focus on the development of a repair process involving the use of GMAW welding and on the development of a repair process involving the use of fiber-reinforced composite liners.

  9. Enhanced human performance of utility maintenance programs

    SciTech Connect (OSTI)

    Fresco, A.; Haber, S.; O`Brien, J.

    1993-08-01

    Assuring the safe operation of a nuclear power plant depends, to a large extent, on how effectively one understands and manages the aging-related degradation that occurs in structures, systems, and components (SSCs). Aging-related degradation is typically managed through a nuclear plant`s maintenance program. A review of 44 Maintenance Team Inspection (MTI) Reports indicated that while some plant organizations appeared to assume a proactive mode in preventing aging-related failures of their SSCs important to safety, others seemed to be taking a passive or reactive mode. Across all plants, what is clearly needed, is a strong recognition of the importance of aging-related degradation and the use of existing organizational assets to effectively detect and mitigate those effects. Many of those assets can be enhanced by the consideration of organizational and management factors necessary for the implementation of an effective aging management program. This report provides a discussion of this program.

  10. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2012

    SciTech Connect (OSTI)

    NSTec Environmental Restoration

    2013-01-28

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2012 and includes inspection and repair activities completed at the following CAUs: · CAU 400: Bomblet Pit and Five Points Landfill (TTR) · CAU 407: Roller Coaster RadSafe Area (TTR) · CAU 424: Area 3 Landfill Complexes (TTR) · CAU 453: Area 9 UXO Landfill (TTR) · CAU 487: Thunderwell Site (TTR)

  11. Piping inspection round robin

    SciTech Connect (OSTI)

    Heasler, P.G.; Doctor, S.R.

    1996-04-01

    The piping inspection round robin was conducted in 1981 at the Pacific Northwest National Laboratory (PNNL) to quantify the capability of ultrasonics for inservice inspection and to address some aspects of reliability for this type of nondestructive evaluation (NDE). The round robin measured the crack detection capabilities of seven field inspection teams who employed procedures that met or exceeded the 1977 edition through the 1978 addenda of the American Society of Mechanical Engineers (ASME) Section 11 Code requirements. Three different types of materials were employed in the study (cast stainless steel, clad ferritic, and wrought stainless steel), and two different types of flaws were implanted into the specimens (intergranular stress corrosion cracks (IGSCCs) and thermal fatigue cracks (TFCs)). When considering near-side inspection, far-side inspection, and false call rate, the overall performance was found to be best in clad ferritic, less effective in wrought stainless steel and the worst in cast stainless steel. Depth sizing performance showed little correlation with the true crack depths.

  12. Microsoft Word - Appendix H - InspectionChecklist.doc

    Office of Legacy Management (LM)

    H Annual Inspection Checklist U.S. Department of Energy Weldon Spring Site LTS&M Plan July 2005 Doc. No. S0079000 Page H-3 Annual Site Inspection Checklist Purpose of the Checklist This checklist has been developed from the EPA guidance document Comprehensive Five Year Review Guidance dated June 2001 (OSWER No. 9355.7-03B-P) and from Section 2.3 of the Long-Term Surveillance and Maintenance Plan for the Weldon Spring, Missouri, Site. The checklist was modified to site-specific conditions as

  13. IR Spot Weld Inspect

    Energy Science and Technology Software Center (OSTI)

    2014-01-01

    In automotive industry, destructive inspection of spot welds is still the mandatory quality assurance method due to the lack of efficient non-destructive evaluation (NDE) tools. However, it is costly and time-consuming. Recently at ORNL, a new NDE prototype system for spot weld inspection using infrared (IR) thermography has been developed to address this problem. This software contains all the key functions that ensure the NDE system to work properly: system input/output control, image acquisition, datamore » analysis, weld quality database generation and weld quality prediction, etc.« less

  14. Genepool Quarterly Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Genepool Quarterly Maintenance Genepool Quarterly Maintenance November 7, 2012 by Kirsten Fagnan The Genepool cluster will be offline for maintenance next Tuesday, November 13th from 7:00 am to 7:00 pm (PST). During this time staff will upgrade the Genepool compute nodes to Debian 6. Also, the firmware for /projectb and /house will be updated. /projectb will be unavailable from 7:00 am to 7:00 pm (PST) and /house will be unavailable from 8:00 am to 1:00 pm (PST). Any webservices or workflows

  15. Maintenance | OpenEI Community

    Open Energy Info (EERE)

    Maintenance Home Rmckeel's picture Submitted by Rmckeel(297) Contributor 8 March, 2013 - 14:23 OpenEI maintenance March 8-9, 2013 developer Maintenance OpenEI We would like to...

  16. CRAD, Maintenance Assessment Plan

    Broader source: Energy.gov [DOE]

    An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations.

  17. CRAD, NNSA- Maintenance (MN)

    Broader source: Energy.gov [DOE]

    CRAD for Maintenance (MN). Criteria Review and Approach Documents (CRADs) that can be used to conduct a well-organized and thorough assessment of elements of safety and health programs.

  18. Surveillance & Maintenance: The Requirements Based Surveillance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Surveillance & Maintenance: The Requirements Based Surveillance and ...

  19. Thermographic Inspections | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Thermographic Inspections Thermographic Inspections Thermographic Inspections Energy auditors may use thermography -- or infrared scanning -- to detect thermal defects and air leakage in building envelopes. How Thermographic Inspections Work Thermography measures surface temperatures by using infrared video and still cameras. These tools see light that is in the heat spectrum. Images on the video or film record the temperature variations of the building's skin, ranging from white for warm

  20. EVALUATION OF SPRING OPERATED RELIEF VALVE MAINTENANCE INTERVALS AND EXTENSION OF MAINTENANCE TIMES USING A WEIBULL ANALYSIS WITH MODIFIED BAYESIAN UPDATING

    SciTech Connect (OSTI)

    Harris, S.; Gross, R.; Mitchell, E.

    2011-01-18

    The Savannah River Site (SRS) spring operated pressure relief valve (SORV) maintenance intervals were evaluated using an approach provided by the American Petroleum Institute (API RP 581) for risk-based inspection technology (RBI). In addition, the impact of extending the inspection schedule was evaluated using Monte Carlo Simulation (MCS). The API RP 581 approach is characterized as a Weibull analysis with modified Bayesian updating provided by SRS SORV proof testing experience. Initial Weibull parameter estimates were updated as per SRS's historical proof test records contained in the Center for Chemical Process Safety (CCPS) Process Equipment Reliability Database (PERD). The API RP 581 methodology was used to estimate the SORV's probability of failing on demand (PFD), and the annual expected risk. The API RP 581 methodology indicates that the current SRS maintenance plan is conservative. Cost savings may be attained in certain mild service applications that present low PFD and overall risk. Current practices are reviewed and recommendations are made for extending inspection intervals. The paper gives an illustration of the inspection costs versus the associated risks by using API RP 581 Risk Based Inspection (RBI) Technology. A cost effective maintenance frequency balancing both financial risk and inspection cost is demonstrated.

  1. Flexible ultrasonic pipe inspection apparatus

    DOE Patents [OSTI]

    Jenkins, C.F.; Howard, B.D.

    1994-01-01

    Pipe crawlers, pipe inspection {open_quotes}rabbits{close_quotes} and similar vehicles are widely used for inspecting the interior surfaces of piping systems, storage tanks and process vessels for damaged or flawed structural features. This paper describes the design of a flexible, modular ultrasonic pipe inspection apparatus.

  2. Aircraft Propeller Hub Repair

    SciTech Connect (OSTI)

    Muth, Thomas R.; Peter, William H.

    2015-02-13

    The team performed a literature review, conducted residual stress measurements, performed failure analysis, and demonstrated a solid state additive manufacturing repair technique on samples removed from a scrapped propeller hub. The team evaluated multiple options for hub repair that included existing metal buildup technologies that the Federal Aviation Administration (FAA) has already embraced, such as cold spray, high velocity oxy-fuel deposition (HVOF), and plasma spray. In addition the team helped Piedmont Propulsion Systems, LLC (PPS) evaluate three potential solutions that could be deployed at different stages in the life cycle of aluminum alloy hubs, in addition to the conventional spray coating method for repair. For new hubs, a machining practice to prevent fretting with the steel drive shaft was recommended. For hubs that were refurbished with some material remaining above the minimal material condition (MMC), a silver interface applied by an electromagnetic pulse additive manufacturing method was recommended. For hubs that were at or below the MMC, a solid state additive manufacturing technique using ultrasonic welding (UW) of thin layers of 7075 aluminum to the hub interface was recommended. A cladding demonstration using the UW technique achieved mechanical bonding of the layers showing promise as a viable repair method.

  3. Sandia Energy - Permitting, Inspection, and Interconnection

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Permitting, Inspection, and Interconnection Home Stationary Power Energy Conversion Efficiency Solar Energy Photovoltaics Solar Market Transformation Permitting, Inspection, and...

  4. Inspection Report: S021S013

    Broader source: Energy.gov [DOE]

    Inspection Report to Management on Inspection of 2001 Safeguards and Security Survey of Los Alamos National Laboratory

  5. Independent Oversight Inspection, Los Alamos National Laboratory...

    Energy Savers [EERE]

    Inspection, Los Alamos National Laboratory - January 2007 Independent Oversight Inspection, Los Alamos National Laboratory - January 2007 January 2007 Independent Oversight...

  6. Window Replacement, Rehabilitation, & Repair Guides - Building...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Window Replacement, Rehabilitation, & Repair Guides - Building America Top Innovation Window Replacement, Rehabilitation, & Repair Guides - Building America Top Innovation Effec...

  7. Infrared microscope inspection apparatus

    DOE Patents [OSTI]

    Forman, S.E.; Caunt, J.W.

    1985-02-26

    Apparatus and system for inspecting infrared transparents, such as an array of photovoltaic modules containing silicon solar cells, includes an infrared microscope, at least three sources of infrared light placed around and having their axes intersect the center of the object field and means for sending the reflected light through the microscope. The apparatus is adapted to be mounted on an X-Y translator positioned adjacent the object surface. 4 figs.

  8. Inspection tester for explosives

    DOE Patents [OSTI]

    Haas, Jeffrey S. (San Ramon, CA); Simpson, Randall L. (Livermore, CA); Satcher, Joe H. (Patterson, CA)

    2007-11-13

    An inspection tester that can be used anywhere as a primary screening tool by non-technical personnel to determine whether a surface contains explosives. It includes a body with a sample pad. First and second explosives detecting reagent holders and dispensers are operatively connected to the body and the sample pad. The first and second explosives detecting reagent holders and dispensers are positioned to deliver the explosives detecting reagents to the sample pad. A is heater operatively connected to the sample pad.

  9. Inspection tester for explosives

    DOE Patents [OSTI]

    Haas, Jeffrey S. (San Ramon, CA); Simpson, Randall L. (Livermore, CA); Satcher, Joe H. (Patterson, CA)

    2010-10-05

    An inspection tester that can be used anywhere as a primary screening tool by non-technical personnel to determine whether a surface contains explosives. It includes a body with a sample pad. First and second explosives detecting reagent holders and dispensers are operatively connected to the body and the sample pad. The first and second explosives detecting reagent holders and dispensers are positioned to deliver the explosives detecting reagents to the sample pad. A is heater operatively connected to the sample pad.

  10. Infrared microscope inspection apparatus

    DOE Patents [OSTI]

    Forman, Steven E. (Framingham, MA); Caunt, James W. (Concord, MA)

    1985-02-26

    Apparatus and system for inspecting infrared transparents, such as an array of photovoltaic modules containing silicon solar cells, includes an infrared microscope, at least three sources of infrared light placed around and having their axes intersect the center of the object field and means for sending the reflected light through the microscope. The apparatus is adapted to be mounted on an X-Y translator positioned adjacent the object surface.

  11. Inspection Report: IG-0534 | Department of Energy

    Energy Savers [EERE]

    4 Inspection Report: IG-0534 December 1, 2001 Inspection of Lawrence Livermore National Laboratory Protective Force and Special Response Team PDF icon Inspection Report: IG-0534 More Documents & Publications Inspection Report: IG-0557 Inspection Report: IG-0563 Inspection Report: IG-0633

  12. Inspection Report: IG-0619 | Department of Energy

    Energy Savers [EERE]

    19 Inspection Report: IG-0619 September 16, 2003 The Security Afforded Selected Tritium Reservoir Shipments (U) The inspection report is classified and is available for review by appropriately cleared personnel with a need to know PDF icon Inspection Report: IG-0619 More Documents & Publications Inspection Report: IG-0731 Inspection Report: IG-0633 Inspection Report: IG-0809

  13. 2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings

    Office of Scientific and Technical Information (OSTI)

    Radiation Control Act Title II Disposal Sites (Technical Report) | SciTech Connect 2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites Citation Details In-Document Search Title: 2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance

  14. Step 5: Operations and Maintenance

    Energy Savers [EERE]

    Process Step 5: Project Operations and Maintenance Project Development Process 1 Potential 5 Operations & Maintenance 3 Refinement 2 Options 4 Implementation 2 1/28/2016 2 Presentation Agenda * Step 5: Project Operations and Maintenance (O&M) * Post-procurement activities * Drivers * Technology examples * Activity 3 Potential Options Refinement Implementation Operations & Maintenance Step 5: Operations & Maintenance 4 Photo by Warren Getz, NREL 00180 Purpose: Conduct or ensure

  15. Pellet inspection apparatus

    DOE Patents [OSTI]

    Wilks, Robert S. (Plum Borough, PA); Taleff, Alexander (Churchill Borough, PA); Sturges, Jr., Robert H. (Plum Borough, PA)

    1982-01-01

    Apparatus for inspecting nuclear fuel pellets in a sealed container for diameter, flaws, length and weight. The apparatus includes, in an array, a pellet pick-up station, four pellet inspection stations and a pellet sorting station. The pellets are delivered one at a time to the pick-up station by a vibrating bowl through a vibrating linear conveyor. Grippers each associated with a successive pair of the stations are reciprocable together to pick up a pellet at the upstream station of each pair and to deposit the pellet at the corresponding downstream station. The gripper jaws are opened selectively depending on the state of the pellets at the stations and the particular cycle in which the apparatus is operating. Inspection for diameter, flaws and length is effected in each case by a laser beam projected on the pellets by a precise optical system while each pellet is rotated by rollers. Each laser and its optical system are mounted in a container which is free standing on a precise surface and is provided with locating buttons which engage locating holes in the surface so that each laser and its optical system is precisely set. The roller stands are likewise free standing and are similarly precisely positioned. The diameter optical system projects a thin beam of light which scans across the top of each pellet and is projected on a diode array. The fl GOVERNMENT CONTRACT CLAUSE The invention herein described was made in the course of or under a contract or subcontract thereunder with the Department of Energy bearing No. EY-67-14-C-2170.

  16. Acoustic inspection device

    DOE Patents [OSTI]

    Diaz, Aaron A.; Burghard, Brion J.; Skorpik, James R.; Pappas, Richard A.; Mullen, O. Dennis; Samuel, Todd J.; Reid, Larry D.; Harris, Joe C.; Valencia, Juan D.; Smalley, Jonathan T.; Shepard, Chester L.; Taylor, Theodore T.

    2005-09-06

    An ultrasound inspection apparatus particularly adapted to examine containers (sealed or unsealed) containing a liquid or solid bulk material. The apparatus has an overall configuration of a hand held pistol with a front transducer contact surface that is positioned against a front wall of the container. An ultrasound pulse is transmitted from the apparatus to be reflected from a back wall of a container being investigated. The received echo pulse is converted to a digital waveform. The waveform is analyzed relative to temperature, travel distance of the pulse(s), and time of travel to ascertain characteristics of the liquid or other materials and to provide identification of the same.

  17. Ceramic inspection system

    DOE Patents [OSTI]

    Werve, Michael E. (Modesto, CA)

    2006-05-16

    A system for inspecting a ceramic component. The ceramic component is positioned on a first rotary table. The first rotary table rotates the ceramic component. Light is directed toward the first rotary table and the rotating ceramic component. A detector is located on a second rotary table. The second rotary table is operably connected to the first rotary table and the rotating ceramic component. The second rotary table is used to move the detector at an angle to the first rotary table and the rotating ceramic component.

  18. An automated neutron monitor maintenance system

    SciTech Connect (OSTI)

    Moore, F.S.; Griffin, J.C.; Odell, D.M.C.

    1996-09-01

    Neutron detectors are commonly used by the nuclear materials processing industry to monitor fissile materials in process vessels and tanks. The proper functioning of these neutron monitors must be periodically evaluated. We have developed and placed in routine use a PC-based multichannel analyzer (MCA) system for on-line BF3 and He-3 gas-filled detector function testing. The automated system: 1) acquires spectral data from the monitor system, 2) analyzes the spectrum to determine the detector`s functionality, 3) makes suggestions for maintenance or repair, as required, and 4) saves the spectrum and results to disk for review. The operator interface has been designed to be user-friendly and to minimize the training requirements of the user. The system may also be easily customized for various applications

  19. Condition Assessment Survey (CAS) Program. Deficiency standards and inspections methods manual: Volume 12, 0.12 Sitework

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    General information is presented for asset determinant factor/CAS repair codes/CAS cost factors; guide sheet tool & material listing; testing methods; inspection frequency; standard system design life tables; system work breakdown structure; and general system/material data. Deficiency standards and inspection methods are given for utility distribution systems, central heating, central cooling, electrical, utility support structures, paving roadways/walkways, and tunnels.

  20. Condition Assessment Survey (CAS) Program. Deficiency standards and inspections methods manual: Volume 11, 0.11 Specialty systems

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    General information is presented for asset determinant factor/CAS repair codes/CAS cost factors; guide sheet tool & material listing; testing methods; inspection frequency; standard system design life tables; system work breakdown structure; and general system/material data. Deficiency standards and inspection methods are presented for canopies; loading dock systems; tanks; domes (bulk storage, metal framing); louvers & vents; access floors; integrated ceilings; and mezzanine structures.

  1. Condition Assessment Survey (CAS) Program. Deficiency standards and inspections methods manual: Volume 1, 0.01 Foundations and footings

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    General information is presented for asset determinant factor/CAS repair codes/CAS cost factors; guide sheet tool & material listing; testing methods; inspection frequency; standard system design life tables; system work breakdown structure; and general system/material data. Deficiency standards and inspection methods are given for footings - spread/strip/grade beams; foundation walls; foundation dampproofing/waterproofing; excavation/backfill/ and piles & caissons.

  2. Condition Assessment Survey (CAS) Program. Deficiency standards and inspections methods manual: Volume 6, 0.06 Interior construction

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    General information is presented for asset determinant factor/CAS repair codes/CAS cost factors; guide sheet tool & material listing; testing methods; inspection frequency; standard system design life tables; system work breakdown structure; and general system/material data. Deficiency standards and inspection methods are presented for conventional and specialty partitions, toilet partitions & accessories, interior doors, paint finishes/coatings/ wall covering systems; floor finishing systems; and ceiling systems.

  3. Condition Assessment Survey (CAS) Program. Deficiency standards and inspections methods manual: Volume 5, 0.05 Roofing

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    General information is presented for asset determinant factor/CAS repair codes/CAS cost factors; guide sheet tool & material listing; testing methods; inspection frequency; standard system design life tables; and system work breakdown structure. Deficiency standards and inspection methods are presented for built-up membrane; single- ply membrane; metal roofing systems; coated foam membrane; shingles; tiles; parapets; roof drainage system; roof specialties; and skylights.

  4. 2003 Annual Inspection of the

    Office of Legacy Management (LM)

    Annual Inspection Report for the DOE Monticello, Utah, Mill Tailings Site and Monticello Vicinity Properties December 2012 LMS/MNT/S09498 This page intentionally left blank LMS/MNT/S09498 2012 Annual Inspection Report for the DOE Monticello, Utah, Mill Tailings Site and Monticello Vicinity Properties December 2012 This page intentionally left blank U.S. Department of Energy 2012 Annual Inspection-Monticello, Utah December 2012 Doc. No. S09498 Page i Contents Executive Summary

  5. 2003 Annual Inspection of the

    Office of Legacy Management (LM)

    Annual Inspection Report for the DOE Monticello, Utah, Mill Tailings Site and Monticello Vicinity Properties December 2013 LMS/MNT/S11014 This page intentionally left blank LMS/MNT/S11014 2013 Annual Inspection Report for the DOE Monticello, Utah, Mill Tailings Site and Monticello Vicinity Properties December 2013 This page intentionally left blank U.S. Department of Energy 2013 Annual Inspection-Monticello, Utah December 2013 Doc. No. S11014 Page i Contents Executive Summary

  6. THE EFFECTS OF MAINTENANCE ACTIONS ON THE PFDavg OF SPRING OPERATED

    Office of Scientific and Technical Information (OSTI)

    PRESSURE RELIEF VALVES (Conference) | SciTech Connect Conference: THE EFFECTS OF MAINTENANCE ACTIONS ON THE PFDavg OF SPRING OPERATED PRESSURE RELIEF VALVES Citation Details In-Document Search Title: THE EFFECTS OF MAINTENANCE ACTIONS ON THE PFDavg OF SPRING OPERATED PRESSURE RELIEF VALVES The safety integrity level (SIL) of equipment used in safety instrumented functions is determined by the average probability of failure on demand (PFDavg) computed at the time of periodic inspection and

  7. OpenEI Community - Maintenance

    Open Energy Info (EERE)

    maintenance March 8-9, 2013 http:en.openei.orgcommunityblogopenei-maintenance-march-8-9-2013

     

    We would like to inform the OpenEI community that OpenEI will be...

  8. Inspection Report: IG-0377 | Department of Energy

    Energy Savers [EERE]

    7 Inspection Report: IG-0377 August 3, 1995 Inspection of Westinghouse Savannah River Company Fees for Managing and Operating the Savannah River Site PDF icon Inspection Report: IG-0377 More Documents & Publications Audit Report: IG-0406 Inspection Report: INS-O-99-01 Inspection Report: INS-O-98-03

  9. Inspection Report: IG-0633 | Department of Energy

    Energy Savers [EERE]

    This inspection report is classified and is available for review by appropriately cleared personnel with a need to know. IG-0633 PDF icon Inspection Report: IG-0633 More Documents & Publications Inspection Report: IG-0619 Inspection Report: IG-0633 Inspection Report: IG-0557

  10. Inspection Report: IG-0809 | Department of Energy

    Office of Environmental Management (EM)

    09 Inspection Report: IG-0809 January 2009 Pantex Laser Perimeter Awareness System This inspection report is not publicly releasable because it contains Unclassified Controlled Nuclear Information. Topic: National Security and Safety PDF icon Inspection Report: IG-0809 More Documents & Publications Pantex Laser Perimeter Awareness System-IG-0809 Inspection Report: IG-0731 Inspection Report: IG-0619

  11. Inspection Report: IG-0367 | Department of Energy

    Office of Environmental Management (EM)

    7 Inspection Report: IG-0367 March 16, 1995 Report on Inspection of an Intelligence Work-For-Others Project at the Idaho Operations Office PDF icon Inspection Report: IG-0367 More Documents & Publications Inspection Report: IG-0369 Inspection Report: INS-O-96-01 DOE O 481.1C, WORK FOR OTHERS (NON-DEPARTMENT OF ENERGY FUNDED WORK)

  12. Inspection Report: IG-0383 | Department of Energy

    Office of Environmental Management (EM)

    3 Inspection Report: IG-0383 January 16, 1996 Inspection of Human Subject Research in Intelligence and Intelligence-Related Projects PDF icon Inspection Report: IG-0383 More Documents & Publications Inspection Report: IG-0384 Audit Report: IG-0388 Inspection Report: INS-O-96-01

  13. Inspection Report: IG-0384 | Department of Energy

    Office of Environmental Management (EM)

    4 Inspection Report: IG-0384 January 18, 1996 Inspection of Concerns Regarding the Martin Marietta Corporate Review of Health and Safety at Martin Marietta Energy Systems PDF icon Inspection Report: IG-0384 More Documents & Publications Inspection Report: IG-0383 Audit Report: IG-0388 Inspection Report: S99IS019

  14. Inspection Report: IG-0563 | Department of Energy

    Office of Environmental Management (EM)

    63 Inspection Report: IG-0563 July 1, 2002 Security of Spent Nuclear Fuel at the West Valley Demonstration Project (U) PDF icon Inspection Report: IG-0563 More Documents & Publications Inspection Report: IG-0557 Inspection Report: IG-0534 Inspection Report: IG-0619

  15. Lessons Learned from Annual Inspection Process - 12329

    SciTech Connect (OSTI)

    Kothari, Vijendra; Uhlmeyer, Terri; Thompson, Randy

    2012-07-01

    The U.S. Department of Energy (DOE) Office of Legacy Management's (LM) mission is to manage DOE's post-closure responsibilities and ensure the future protection of human health and the environment. LM has control and custody of legacy land, structures, and facilities and is responsible for maintaining them at levels suitable for their long-term use. As defined by the DOE guidance document Long-Term Stewardship Planning Guidance for Closure Sites, long-term stewardship refers to all activities necessary to ensure protection of human health and the environment. These activities include, but are not limited to, 'all engineered and institutional controls (ICs) designed to contain or to prevent exposure to residual contamination and waste, such as surveillance activities, record-keeping activities, inspections, groundwater monitoring, maintenance of other barriers and contained structures, access control, and posting signs'. The development and management of ICs have been, and continue to be, critical to the success of LM surveillance and maintenance activities. (authors)

  16. 2003 Annual Inspection of the

    Office of Legacy Management (LM)

    Inspection Report for the DOE Monticello, Utah, Mill Tailings Site and Monticello Vicinity Properties December 2014 LMS/MNT/S12425 This page intentionally left blank U.S. Department of Energy 2014 Annual Inspection-Monticello, Utah December 2014 Doc. No. S12425 Page i Contents Abbreviations .................................................................................................................................. ii Executive Summary

  17. 8744 - OSDF Inspection Report

    Office of Legacy Management (LM)

    3.1 03/13 On-Site Disposal Facility Inspection Report March 2013 6319D-6168 8933.2 03/13 East Face Cell 1 West Face Cell 1 6319D-6149 6319D-6155 8933.3 03/13 North Face Cell 1 North Drainage (looking west) 6319D-6151 6319D-6152 8933.4 03/13 East Face Cell 2 West Face Cell 2 6319D-6056 6319D-6148 8933.5 03/13 East Face Cell 3 West Face Cell 3 6319D-6157 6319D-6147 8933.6 03/13 East Face Cell 4 West Face Cell 4 6319D-6158 6319D-6145 8933.7 03/13 East Face Cell 5 West Face Cell 5 6319D-6160

  18. OSDF Inspection Report

    Office of Legacy Management (LM)

    29.1 12/12 On-Site Disposal Facility Inspection Report December 2012 6319D-6137 8929.2 12/12 East Face Cell 1 West Face Cell 1 6319D-6112 6319D-6135 8929.3 12/12 North Face Cell 1 North Drainage (looking west) 6319D-6110 6319D-6109 8929.4 12/12 East Face Cell 2 West Face Cell 2 6319D-6034 6319D-6113 8929.5 12/12 East Face Cell 3 West Face Cell 3 6319D-6133 6319D-6114 8929.6 12/12 East Face Cell 4 West Face Cell 4 6319D-6131 6319D-6116 8929.7 12/12 East Face Cell 5 West Face Cell 5 6319D-6130

  19. Inspection system calibration methods

    DOE Patents [OSTI]

    Deason, Vance A.; Telschow, Kenneth L.

    2004-12-28

    An inspection system calibration method includes producing two sideband signals of a first wavefront; interfering the two sideband signals in a photorefractive material, producing an output signal therefrom having a frequency and a magnitude; and producing a phase modulated operational signal having a frequency different from the output signal frequency, a magnitude, and a phase modulation amplitude. The method includes determining a ratio of the operational signal magnitude to the output signal magnitude, determining a ratio of a 1st order Bessel function of the operational signal phase modulation amplitude to a 0th order Bessel function of the operational signal phase modulation amplitude, and comparing the magnitude ratio to the Bessel function ratio.

  20. Major NERSC Maintenance Tuesday November 11

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Major NERSC Maintenance Tuesday November 11 Major NERSC Maintenance Tuesday November 11 October 31, 2014 by Francesca Verdier There will be a major NERSC maintenance on Tuesday,...

  1. Device for inspecting vessel surfaces

    DOE Patents [OSTI]

    Appel, D. Keith (Aiken, SC)

    1995-01-01

    A portable, remotely-controlled inspection crawler for use along the walls of tanks, vessels, piping and the like. The crawler can be configured to use a vacuum chamber for supporting itself on the inspected surface by suction or a plurality of magnetic wheels for moving the crawler along the inspected surface. The crawler is adapted to be equipped with an ultrasonic probe for mapping the structural integrity or other characteristics of the surface being inspected. Navigation of the crawler is achieved by triangulation techniques between a signal transmitter on the crawler and a pair of microphones attached to a fixed, remote location, such as the crawler's deployment unit. The necessary communications are established between the crawler and computers external to the inspection environment for position control and storage and/or monitoring of data acquisition.

  2. Ultrasonic inspection and deployment apparatus

    DOE Patents [OSTI]

    Michaels, Jennifer E. (Ithaca, NY); Michaels, Thomas E. (Ithaca, NY); Mech, Jr., Stephen J. (Pasco, WA)

    1984-01-01

    An ultrasonic inspection apparatus for the inspection of metal structures, especially installed pipes. The apparatus combines a specimen inspection element, an acoustical velocity sensing element, and a surface profiling element, all in one scanning head. A scanning head bellows contains a volume of oil above the pipe surface, serving as acoustical couplant between the scanning head and the pipe. The scanning head is mounted on a scanning truck which is mobile around a circular track surrounding the pipe. The scanning truck has sufficient motors, gears, and position encoders to allow the scanning head six degrees of motion freedom. A computer system continually monitors acoustical velocity, and uses that parameter to process surface profiling and inspection data. The profiling data is used to automatically control scanning head position and alignment and to define a coordinate system used to identify and interpret inspection data. The apparatus is suitable for highly automated, remote application in hostile environments, particularly high temperature and radiation areas.

  3. Requirements for Bridge Inspection | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements for Bridge Inspection Requirements for Bridge Inspection More Documents & Publications Microsoft PowerPoint - 2009.10.27 Bridge Inspection Follow-up Slide 1 National Bridge Inventory Record Data Submission Requirement

  4. Rural Alaska Maintenance Partnership

    Energy Savers [EERE]

    ï‚• What is RAMP? ï‚• Who is involved with RAMP? ï‚• Why was RAMP needed? ï‚• What are the goals of RAMP? ï‚• What is the current status of RAMP? Alaska Rural Energy Conference April 30, 2013 "To create a self-sustaining facility operations and maintenance system that develops the capacity of rural Alaskans to operate and maintain their infrastructure in a manner that protects and enhances the health, safety and sustainability of rural communities and their residents." Paradigm Local,

  5. Independent Oversight Inspection, Oak Ridge National Laboratory...

    Broader source: Energy.gov (indexed) [DOE]

    8 Inspection of Nuclear Safety at the Oak Ridge National Laboratory Radiochemical Engineering Development Center, Building 7920 This report provides the results of an inspection of...

  6. CRAD, Performance Based Inspection- June 9, 2009

    Office of Energy Efficiency and Renewable Energy (EERE)

    Performance Based Inspection of Worker Safety and Health Utilizing the ISM Core Functions: Inspection Criteria, Approach, and Lines of Inquiry, (HSS CRAD 64-10, Rev. 2)

  7. Independent Oversight Inspection, Pantex Plant, Summary Report...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Inspection, Pantex Plant, Summary Report - November 2002 November 2002 Inspection of Environment, Safety, and Health and Emergency Management at the Pantex Plant This report...

  8. Inspection Report: IG-0478 | Department of Energy

    Energy Savers [EERE]

    July 28, 2000 Inspection on the Review of Scientific Integrity Issues at Lawrence Berkeley National Laboratory The Office of Inspector General initiated an inspection into...

  9. Inspection Report: IG-0472 | Department of Energy

    Office of Environmental Management (EM)

    72 Inspection Report: IG-0472 June 1, 2000 Inspection of Surplus Computer Equipment Management at the Savannah River Site By letter dated November 1, 1999, Senator Strom Thurmond...

  10. Inspection Report: IG-0701 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Inspection Report: IG-0701 September 30, 2005 Electronic Recording of Telephone and Radio Conversations by Sandia Protective Force Management PDF icon Inspection Report: IG-0701...

  11. Addressing Deferred Maintenance, Infrastructure Costs, and Excess...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities at Portsmouth and Paducah Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities ...

  12. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2010

    SciTech Connect (OSTI)

    NSTec Environmental Restoration

    2011-03-30

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2010 and includes inspection and repair activities completed at the following seven CAUs: · CAU 400: Bomblet Pit and Five Points Landfill (TTR) · CAU 407: Roller Coaster RadSafe Area (TTR) · CAU 424: Area 3 Landfill Complexes (TTR) · CAU 426: Cactus Spring Waste Trenches (TTR) · CAU 453: Area 9 UXO Landfill (TTR) · CAU 484: Surface Debris, Waste Sites, and Burn Area (TTR) · CAU 487: Thunderwell Site (TTR)

  13. The Effects of Maintenance Actions on the PFDavg of Spring Operated Pressure Relief Valves

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Harris, S.; Gross, R.; Goble, W; Bukowski, J

    2015-12-01

    The safety integrity level (SIL) of equipment used in safety instrumented functions is determined by the average probability of failure on demand (PFDavg) computed at the time of periodic inspection and maintenance, i.e., the time of proof testing. The computation of PFDavg is generally based solely on predictions or estimates of the assumed constant failure rate of the equipment. However, PFDavg is also affected by maintenance actions (or lack thereof) taken by the end user. This paper shows how maintenance actions can affect the PFDavg of spring operated pressure relief valves (SOPRV) and how these maintenance actions may be accountedmore » for in the computation of the PFDavg metric. The method provides a means for quantifying the effects of changes in maintenance practices and shows how these changes impact plant safety.« less

  14. The Effects of Maintenance Actions on the PFDavg of Spring Operated Pressure Relief Valves

    SciTech Connect (OSTI)

    Harris, S.; Gross, R.; Goble, W; Bukowski, J

    2015-12-01

    The safety integrity level (SIL) of equipment used in safety instrumented functions is determined by the average probability of failure on demand (PFDavg) computed at the time of periodic inspection and maintenance, i.e., the time of proof testing. The computation of PFDavg is generally based solely on predictions or estimates of the assumed constant failure rate of the equipment. However, PFDavg is also affected by maintenance actions (or lack thereof) taken by the end user. This paper shows how maintenance actions can affect the PFDavg of spring operated pressure relief valves (SOPRV) and how these maintenance actions may be accounted for in the computation of the PFDavg metric. The method provides a means for quantifying the effects of changes in maintenance practices and shows how these changes impact plant safety.

  15. THE EFFECTS OF MAINTENANCE ACTIONS ON THE PFDavg OF SPRING OPERATED PRESSURE RELIEF VALVES

    SciTech Connect (OSTI)

    Harris, S.; Gross, R.

    2014-04-01

    The safety integrity level (SIL) of equipment used in safety instrumented functions is determined by the average probability of failure on demand (PFDavg) computed at the time of periodic inspection and maintenance, i.e., the time of proof testing. The computation of PFDavg is generally based solely on predictions or estimates of the assumed constant failure rate of the equipment. However, PFDavg is also affected by maintenance actions (or lack thereof) taken by the end user. This paper shows how maintenance actions can affect the PFDavg of spring operated pressure relief valves (SOPRV) and how these maintenance actions may be accounted for in the computation of the PFDavg metric. The method provides a means for quantifying the effects of changes in maintenance practices and shows how these changes impact plant safety.

  16. Bosh repairs No. 3 blast furnace, Edgar Thomson Plant Mon Valley Works

    SciTech Connect (OSTI)

    Stoupis, M.G.

    1993-01-01

    The paper describes in detail the steps taken from quenching to dry out of the furnace to repair the bosh area of the No.3 blast furnace. Inspection of the area revealed that there was no brick anywhere in the bosh. Brick in the tuyere breast area had been peeled back to reveal the steel plate, and descaling revealed 14 pipes fully exposed. None were leaking, but one seemed badly deteriorated. Conventional repairs could not take place before the scheduled blow-in. Installation of coolers were instead tried.

  17. Risk-based maintenance modeling. Prioritization of maintenance importances and quantification of maintenance effectiveness

    SciTech Connect (OSTI)

    Vesely, W.E.; Rezos, J.T.

    1995-09-01

    This report describes methods for prioritizing the risk importances of maintenances using a Probabilistic Risk Assessment (PRA). Approaches then are described for quantifying their reliability and risk effects. Two different PRA importance measures, minimal cutset importances and risk reduction importances, were used to prioritize maintenances; the findings show that both give similar results if appropriate criteria are used. The justifications for the particular importance measures also are developed. The methods developed to quantify the reliability and risk effects of maintenance actions are extensions of the usual reliability models now used in PRAs. These extended models consider degraded states of the component, and quantify the benefits of maintenance in correcting degradations and preventing failures. The negative effects of maintenance, including downtimes, also are included. These models are specific types of Markov models. The data for these models can be obtained from plant maintenance logs and from the Nuclear Plant Reliability Data System (NPRDS). To explore the potential usefulness of these models, the authors analyzed a range of postulated values of input data. These models were used to examine maintenance effects on a components reliability and performance for various maintenance programs and component data. Maintenance schedules were analyzed to optimize the component`s availability. In specific cases, the effects of maintenance were found to be large.

  18. Solar Permitting & Inspection Webinar Series

    Broader source: Energy.gov [DOE]

    ICLEI Local Governments for Sustainability U.S.A. and the Interstate Renewable Energy Council, Inc. (IREC) present a series of three webinars on Solar Permitting & Inspection. As part of the U...

  19. Test Site Operations & Maintenance Safety

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Test Site Operations & Maintenance Safety - Sandia Energy Energy Search Icon Sandia Home ... Applications National Solar Thermal Test Facility Nuclear Energy Systems ...

  20. Upcoming BPAT Systems Maintenance Events

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Upcoming-BPAT-Systems-Maintenance-Events Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer Involvement Expand Customer...

  1. US Department of Energy - Maintenance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Howdy fellow energy adventurer Energy.gov is currently undergoing routine maintenance that will make it even more awesome. Please try again in a few minutes. We...

  2. Tim Kuneli, Electronics Maintenance Group

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tim Kuneli, Electronics Maintenance Group Print The recent ALS power supply failure was one of the most challenging projects that Electronics Engineer Technical Superintendent Tim...

  3. POST-CLOSURE INSPECTION AND MONITORING REPORT FOR CORRECTIVE ACTION UNIT 112: AREA 23 HAZARDOUS WASTE TRENCHES, NEVADA TEST SITE, NEVADA; FOR THE PERIOD OCTOBER 2003 - SEPTEMBER 2004

    SciTech Connect (OSTI)

    BECHTEL NEVADA

    2004-12-01

    Corrective Action Unit (CAU) 112, Area 23 Hazardous Waste Trenches, Nevada Test Site (NTS), Nevada, is a Resource Conservation and Recovery Act (RCRA) unit located in Area 23 of the NTS. This annual Post-Closure Inspection and Monitoring Report provides the results of inspections and monitoring for CAU 112. This report includes a summary and analysis of the site inspections, repair and maintenance, meteorological information, and neutron soil moisture monitoring data obtained at CAU 112 for the current monitoring period, October 2003 through September 2004. Inspections of the CAU 112 RCRA unit were performed quarterly to identify any significant physical changes to the site that could impact the proper operation of the waste unit. The overall condition of the covers and facility was good, and no significant findings were observed. The annual subsidence survey of the elevation markers was conducted on August 23, 2004, and the results indicated that no cover subsidence4 has occurred at any of the markers. The elevations of the markers have been consistent for the past 11 years. The total precipitation for the current reporting period, october 2003 to September 2004, was 14.0 centimeters (cm) (5.5 inches [in]) (National Oceanographic and Atmospheric Administration, Air Resources Laboratory, Special Operations and Research Division, 2004). This is slightly below the average rainfall of 14.7 cm (5.79 in) over the same period from 1972 to 2004. Post-closure monitoring verifies that the CAU 112 trench covers are performing properly and that no water is infiltrating into or out of the waste trenches. Sail moisture measurements are obtained in the soil directly beneath the trenches and compared to baseline conditions for the first year of post-closure monitoring, which began in october 1993. neutron logging was performed twice during this monitoring period along 30 neutron access tubes to obtain soil moisture data and detect any changes that may indicate moisture movement beneath each trench. Soil moisture results obtained to date indicate that the compliance criterion of less than 5% Residual Volumetric Moisture Content was met. Soil conditions remain dry and stable beneath the trenches, and the cover is functioning as designed within the compliance limits.

  4. Independent Oversight Inspection, Hanford Site- February 2009

    Office of Energy Efficiency and Renewable Energy (EERE)

    Inspection of Environment, Safety and Health Programs at the Hanford Site Waste Treatment and Immobilization Plant

  5. Grantee Checklist for the Inspection & Monitoring Requirement

    Broader source: Energy.gov [DOE]

    This document walks Grantees through the Inspection and Monitoring requirement of the Quality Work Plan.

  6. Quality Work Plan Inspection and Monitoring Requirement

    Broader source: Energy.gov [DOE]

    Inspection and monitoring requirements for Weatherization Assistance Program's comprehensive Quality Work Plan.

  7. Inspection Report: IG-0401 | Department of Energy

    Office of Environmental Management (EM)

    01 Inspection Report: IG-0401 March 10, 1997 Report on Inspection of the Performance Based Incentive Program at the Richland Operations Office PDF icon Inspection Report: IG-0401 More Documents & Publications John C. Layton: Before The Subcommittee on Oversight and Investigations U.S. House of Representatives Inspection Report: INS-O-98-03 Audit Report: OAS-L-06-18

  8. Inspection/Sampling Schedule | Department of Energy

    Energy Savers [EERE]

    Inspection/Sampling Schedule Inspection/Sampling Schedule Site Inspection and Water Sampling Schedules Note: The following schedules are subject to change without prior notice and will be updated periodically. Site Name Inspection Date Sampling Week Ambrosia Lake, NM, Disposal Site August 22, 2016 December 3, 2015 Bluewater, NM, Disposal Site August 22, 2016 December 2, 2015 May 23, 2016 BONUS, PR, Decommissioned Reactor Site No annual inspections N/A Burrell, PA, Disposal Site October 28, 2015

  9. Inspection Report: IG-0731 | Department of Energy

    Office of Environmental Management (EM)

    1 Inspection Report: IG-0731 June 27, 2006 Review of the Protective Force Radio Communication System at Sandia National Laboratory-New Mexico (U) Report on Review of the Protective Force Radio Communication System at Sandia National Laboratory-New Mexico (U). This inspection report is not publicly releasable because it contains information that is CLASSIFIED. PDF icon Inspection Report: IG-0731 More Documents & Publications Inspection Report: IG-0619 Inspection Report: IG-0809 Pantex Laser

  10. Audits & Inspections | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Audits & Inspections Audits & Inspections Audits & Inspections The Office of Audits and Inspections provides all internal and contracted audit activities, inspections, and reviews for Department programs and operations, including the National Nuclear Security Administration (NNSA) and the Federal Energy Regulatory Commission (FERC). The Office also performs all OIG intelligence oversight and reporting as required by Executive Order and statue. The Office works as an agent for

  11. Hot repair of ceramic burner on hot blast stoves at USS/Kobe`s {number_sign}3 blast furnace

    SciTech Connect (OSTI)

    Bernarding, T.F.; Chemorov, M.; Shimono, S.; Phillips, G.R.

    1997-12-31

    During the 1992 reline of the No. 3 blast furnace, three new stoves were constructed. The design of the stoves, equipped with internal ceramic burners, was for providing a hot blast temperature of 2,000 F at a wind rate of 140,000 SCFM. After 3 years the performance had deteriorated so the burners were cleaned. When a second cleaning did not improve the performance of No. 3 blast furnace, it was decided to repair the refractory while still hot. The paper describes the hot repair procedures, taking a stove off for repairs, maintenance heat up during repairs, two stove operation, stove commissioning, repair of a ceramic burner, and wet gas prevention.

  12. Motor Repair Tech Brief | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Repair Tech Brief Motor Repair Tech Brief This Tech Brief answers: Why do motors fail? When should you repair instead of replace? And how can reliability and efficiency be assured in a repair? PDF icon Motor Repair Tech Brief (March 2000) More Documents & Publications Extend the Operating Life of Your Motor Service Center Evaluation Guide Premium Efficiency Motor Selection and Application Guide - A Handbook for Industry

  13. Selected Bibliography on Electric Motor Repair

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Selected Bibliography on Electric Motor Repair Acknowledgements The following series of Repair Documents-The Service Center Evaluation Guide, Selected Bibliography on Electric Motor Repair, Model Repair Specifications for Low Voltage Motors, and Motor Repair Tech Brief- were produced by the U.S. Department of Energy's Office of Industrial Technologies (OIT) with input from trade associations, consulting companies, manufacturers, non-profit corporations, and others. OIT would like to thank the

  14. Evaluation and field validation of Eddy-Current array probes for steam generator tube inspection

    SciTech Connect (OSTI)

    Dodd, C.V.; Pate, J.R.

    1996-07-01

    The objective of the Improved Eddy-Current ISI for Steam Generator Tubing program is to upgrade and validate eddy-current inspections, including probes, instrumentation, and data processing techniques for inservice inspection of new, used, and repaired steam generator tubes; to improve defect detection, classification, and characterization as affected by diameter and thickness variations, denting, probe wobble, tube sheet, tube supports, copper and sludge deposits, even when defect types and other variables occur in combination; to transfer this advanced technology to NRC`s mobile NDE laboratory and staff. This report describes the design of specialized high-speed 16-coil eddy-current array probes. Both pancake and reflection coils are considered. Test results from inspections using the probes in working steam generators are given. Computer programs developed for probe calculations are also supplied.

  15. Magnetic flux leakage inspection of gas pipelines: Experience with a collapsible tool. Final report, July 1996

    SciTech Connect (OSTI)

    Scrivner, R.W.

    1996-07-01

    The Magnetic Flux Leakage (MFL) technique is the most commonly used method to inspect transmission pipelines for corrosion. A typical MFL tool operates in pipelines which have no restrictions. Reduced size valves, a 24 inch valve in a 30 inch pipeline, are one such restriction. A collapsible MFL tool was developed to allow pipelines with reduced size valves to be inspected without expensive valve replacement. The first use, in 1995, of a 30 inch tool succeeded in passing through the valves and inspecting the pipeline. The first use of a 36 inch tool railed due to a partially closed valve, damaging the tool. The tool was ultimately run after some repairs to the tool and most of the reduced size valves were replaced with full size valves. The results of the final run were very good. Additional use of the tools in 1996 has provided excellent results.

  16. Final Report Inspection of Aged/Degraded Containments Program.

    SciTech Connect (OSTI)

    Naus, Dan J; Ellingwood, B R; Oland, C Barry

    2005-09-01

    The Inspection of Aged/Degraded Containments Program had primary objectives of (1) understanding the significant factors relating corrosion occurrence, efficacy of inspection, and structural capacity reduction of steel containments and liners of reinforced concrete containments; (2) providing the United States Nuclear Regulatory Commission (USNRC) reviewers a means of establishing current structural capacity margins or estimating future residual structural capacity margins for steel containments, and concrete containments as limited by liner integrity; (3) providing recommendations, as appropriate, on information to be requested of licensees for guidance that could be utilized by USNRC reviewers in assessing the seriousness of reported incidences of containment degradation; and (4) providing technical assistance to the USNRC (as requested) related to concrete technology. Primary program accomplishments have included development of a degradation assessment methodology; reviews of techniques and methods for inspection and repair of containment metallic pressure boundaries; evaluation of high-frequency acoustic imaging, magnetostrictive sensor, electromagnetic acoustic transducer, and multimode guided plate wave technologies for inspection of inaccessible regions of containment metallic pressure boundaries; development of a continuum damage mechanics-based approach for structural deterioration; establishment of a methodology for reliability-based condition assessments of steel containments and liners; and fragility assessments of steel containments with localized corrosion. In addition, data and information assembled under this program has been transferred to the technical community through review meetings and briefings, national and international conference participation, technical committee involvement, and publications of reports and journal articles. Appendix A provides a listing of program reports, papers, and publications; and Appendix B contains a listing of program-related presentations.

  17. Natural Gas Vehicle Cylinder Safety, Training and Inspection Project

    SciTech Connect (OSTI)

    Hank Seiff

    2008-12-31

    Under the auspices of the National Energy Technology Laboratory and the US Department of Energy, the Clean Vehicle Education Foundation conducted a three-year program to increase the understanding of the safe and proper use and maintenance of vehicular compressed natural gas (CNG) fuel systems. High-pressure fuel systems require periodic inspection and maintenance to insure safe and proper operation. The project addressed the needs of CNG fuel containers (cylinders) and associated high-pressure fuel system components related to existing law, codes and standards (C&S), available training and inspection programs, and assured coordination among vehicle users, public safety officials, fueling station operators and training providers. The program included a public and industry awareness campaign, establishment and administration of a cylinder inspector certification training scholarship program, evaluation of current safety training and testing practices, monitoring and investigation of CNG vehicle incidents, evaluation of a cylinder recertification program and the migration of CNG vehicle safety knowledge to the nascent hydrogen vehicle community.

  18. Guided acoustic wave inspection system

    DOE Patents [OSTI]

    Chinn, Diane J.

    2004-10-05

    A system for inspecting a conduit for undesirable characteristics. A transducer system induces guided acoustic waves onto said conduit. The transducer system detects the undesirable characteristics of the conduit by receiving guided acoustic waves that contain information about the undesirable characteristics. The conduit has at least two sides and the transducer system utilizes flexural modes of propagation to provide inspection using access from only the one side of the conduit. Cracking is detected with pulse-echo testing using one transducer to both send and receive the guided acoustic waves. Thinning is detected in through-transmission testing where one transducer sends and another transducer receives the guided acoustic waves.

  19. A survey of repair practices for nuclear power plant containment metallic pressure boundaries

    SciTech Connect (OSTI)

    Oland, C.B.; Naus, D.J.

    1998-05-01

    The Nuclear Regulatory Commission has initiated a program at the Oak Ridge National Laboratory to provide assistance in their assessment of the effects of potential degradation on the structural integrity and leaktightness of metal containment vessels and steel liners of concrete containments in nuclear power plants. One of the program objectives is to identify repair practices for restoring metallic containment pressure boundary components that have been damaged or degraded in service. This report presents issues associated with inservice condition assessments and continued service evaluations and identifies the rules and requirements for the repair and replacement of nonconforming containment pressure boundary components by welding or metal removal. Discussion topics include base and welding materials, welding procedure and performance qualifications, inspection techniques, testing methods, acceptance criteria, and documentation requirements necessary for making acceptable repairs and replacements so that the plant can be returned to a safe operating condition.

  20. Part IV: Section E - Inspection and Acceptance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SECTION E INSPECTION AND ACCEPTANCE DE-AC36-08GO28308 Modification M901 Section E - Page ii PART I SECTION E INSPECTION AND ACCEPTANCE TABLE OF CONTENTS E.1 FAR 52.246-9 Inspection of Research and Development (Short Form) (Apr 1984) 1 E.2 Acceptance 1 E.3 Certification 1 DE-AC36-08GO28308 Modification M901 Section E - Page 1 of 1 PART I SECTION E INSPECTION AND ACCEPTANCE E.1 FAR 52.246-9 Inspection of Research and Development (Short Form) (Apr 1984) The Government has the right to inspect and

  1. Independent Oversight Inspection, Y-12 National Security Complex...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Inspection, Y-12 National Security Complex - April 2003 Independent Oversight Inspection, Y-12 National Security Complex - April 2003 April 2003 Inspection of Environment, Safety,...

  2. Inspection Report: S05IS042 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Inspection Report: S05IS042 September 27, 2005 Inspection Letter Report on "Inspection of Possible Ethics Violation" Not Available for Viewing More Documents & Publications ...

  3. Protocol, Inspection Criteria - April 23, 2008 | Department of...

    Energy Savers [EERE]

    Protocol, Inspection Criteria - April 23, 2008 Protocol, Inspection Criteria - April 23, 2008 April 23, 2008 Inspection Criteria, Activities, and Lines of Inquiry, April 23, 2008...

  4. Web Maintenance Requirements | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Office of Energy Efficiency and Renewable Energy (EERE) expects its offices to review and maintain their online content on an ongoing basis throughout the year. This includes two kinds of maintenance: technical maintenance and content maintenance. Websites that are no longer being maintained should be archived. Read more about EERE's expectations for website maintenance. Maintenance Schedule All Web Coordinators should ensure these tasks are completed. Perform ongoing content maintenance.

  5. Residential Solar Permit Requirements

    Broader source: Energy.gov [DOE]

    Washington's State Building Code sets requirements for the installation, inspection, maintenance and repair of solar photovoltaic (PV) energy systems. Local jurisdictions have the authority to...

  6. Table Definitions, Sources, and Explanatory Notes

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    of capacity for scheduled downtime due to such conditions as routine inspection, maintenance, repairs, and turnaround; and the reduction of capacity for unscheduled downtime...

  7. Robotic Welding and Inspection System

    SciTech Connect (OSTI)

    H. B. Smartt; D. P. Pace; E. D. Larsen; T. R. McJunkin; C. I. Nichol; D. E. Clark; K. L. Skinner; M. L. Clark; T. G. Kaser; C. R. Tolle

    2008-06-01

    This paper presents a robotic system for GTA welding of lids on cylindrical vessels. The system consists of an articulated robot arm, a rotating positioner, end effectors for welding, grinding, ultrasonic and eddy current inspection. Features include weld viewing cameras, modular software, and text-based procedural files for process and motion trajectories.

  8. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in...

  9. Spring Home Maintenance: Windows, Windows, Windows! | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Home Maintenance: Windows, Windows, Windows Spring Home Maintenance: Windows, Windows, Windows April 26, 2013 - 11:42am Addthis Caulking is an easy way to reduce air leakage ...

  10. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in ...

  11. Requirements Based Surveillance and Maintenance Review Process...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Based Surveillance and Maintenance Review Process Interview Form Requirements Based Surveillance and Maintenance Review Process Interview Form PDF icon Requirements Based ...

  12. Efficiency Lighting & Maintenance Inc | Open Energy Information

    Open Energy Info (EERE)

    & Maintenance Inc Jump to: navigation, search Name: Efficiency Lighting & Maintenance Inc Address: 5a Del Mar Drive Place: Brookfield, Connecticut Zip: 06804 Region: Northeast - NY...

  13. Geothermal Data Development, Collection, and Maintenance | Open...

    Open Energy Info (EERE)

    Data Development, Collection, and Maintenance Jump to: navigation, search Geothermal ARRA Funded Projects for Geothermal Data Development, Collection, and Maintenance Loading...

  14. Maintenance Planner | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Maintenance Planner Department: Facilities Requisition Number: 1501075 Position Summary: This multi-trade Maintenance Planner position will enhance the Lab's Facilities Division...

  15. Oregon Department of Transportation - Maintenance and Operations...

    Open Energy Info (EERE)

    Maintenance and Operations Branch Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Oregon Department of Transportation - Maintenance and Operations...

  16. Human Factors/Ergonomics Handbook for the Design for the Ease of Maintenance

    Office of Environmental Management (EM)

    113 3.0 WORKSPACE, STORAGE, AND WORKSHOP DESIGN 3.1 Workspace and operations in non-workshop areas 3.1.1 Workspace 3.1.1.1 General Maintenance clearance. To provide adequate clearance for maintainers and to provide sufficient space to accommodate tools, test equipment, procedures, and other job aids during an in-place repair, a nominal 914 mm (36 in.) maintenance clearance should be provided around all major system components and piping of 610 mm (24 in.) diameter and larger. 3.1.1.1 Console

  17. Inspection Report: IG-0679 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 Inspection Report: IG-0679 March 10, 2005 Security and Other Issues Related to the Shipment of Classified Parts to the Waste Isolation Pilot Plant (U) This inspection report is...

  18. Piping inspection carriage having axially displaceable sensor

    DOE Patents [OSTI]

    Zollinger, W.T.; Treanor, R.C.

    1994-12-06

    A pipe inspection instrument carriage is described for use with a pipe crawler for performing internal inspections of piping surfaces. The carriage has a front leg assembly, a rear leg assembly and a central support connecting the two assemblies and for mounting an instrument arm having inspection instruments. The instrument arm has a Y-arm mounted distally thereon for axially aligning the inspection instrumentation and a mounting block, a linear actuator and axial movement arm for extending the inspection instruments radially outward to operably position the inspection instruments on the piping interior. Also, the carriage has a rotation motor and gear assembly for rotating the central support and the front leg assembly with respect to the rear leg assembly so that the inspection instruments azimuthally scan the piping interior. The instrument carriage allows performance of all piping inspection operations with a minimum of moving parts, thus decreasing the likelihood of performance failure. 4 figures.

  19. Piping inspection carriage having axially displaceable sensor

    DOE Patents [OSTI]

    Zollinger, William T. (Martinez, GA); Treanor, Richard C. (Augusta, GA)

    1994-01-01

    A pipe inspection instrument carriage for use with a pipe crawler for performing internal inspections of piping surfaces. The carriage has a front leg assembly, a rear leg assembly and a central support connecting the two assemblies and for mounting an instrument arm having inspection instruments. The instrument arm has a y-arm mounted distally thereon for axially aligning the inspection instrumentation and a mounting block, a linear actuator and axial movement arm for extending the inspection instruments radially outward to operably position the inspection instruments on the piping interior. Also, the carriage has a rotation motor and gear assembly for rotating the central support and the front leg assembly with respect to the rear leg assembly so that the inspection instruments azimuthally scan the piping interior. The instrument carriage allows performance of all piping inspection operations with a minimum of moving parts, thus decreasing the likelihood of performance failure.

  20. Inspection Report: IG-0455 | Department of Energy

    Energy Savers [EERE]

    55 Inspection Report: IG-0455 December 22, 1999 Inspection of the Sale of a Paragon Supercomputer by Sandia National Laboratories On July 27, 1999, we initiated an inspection into the facts and circumstances surrounding the sale and repurchase of an INTEL Paragon XPS supercomputer (Paragon) by Sandia National Laboratories (Sandia), Albuquerque, New Mexico. This inspection was initiated at your request based on concerns that the sale of the Paragon supercomputer to a Chinese national could be

  1. Inspection Report: IG-0578 | Department of Energy

    Energy Savers [EERE]

    8 Inspection Report: IG-0578 December 19, 2002 Inspection of Explosives Safety at Selected Department of Energy Sites The Office of Inspector General, U.S. Department of Energy (DOE), conducted an inspection at the Nevada Operations Office (NVO) and the Oak Ridge Operations Office (ORO) to determine if explosives were being stored in accordance with applicable DOE requirements. PDF icon Inspection Report: IG-0578 More Documents & Publications Office of Inspector General Quarterly Report

  2. Industrial Inspection Technologies | GE Global Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Industrial Inspection Technologies at GE Global Research Click to email this to a friend (Opens in new window) Share on Facebook (Opens in new window) Click to share (Opens in new window) Click to share on LinkedIn (Opens in new window) Click to share on Tumblr (Opens in new window) Industrial Inspection Technologies at GE Global Research Waseem Faidi, manager of the Inspection and Metrology Lab at GE Global Research, describes developments in industrial inspection. You Might Also Like

  3. Independent Oversight Inspection, Hanford Site- September 2006

    Office of Energy Efficiency and Renewable Energy (EERE)

    Inspection of Environment, Safety, and Health and Emergency Management Programs at the Hanford Site Waste Stabilization and Disposition Project

  4. Inspection Report: IG-9701 | Department of Energy

    Office of Environmental Management (EM)

    9701 Inspection Report: IG-9701 January 16, 1997 Inspection of Alleged Design and Construction Deficiencies in the Nuclear Materials Storage Facility at the Los Alamos National Laboratory PDF icon Inspection Report: IG-9701 More Documents & Publications Inspection Report: INS-O-97-01 Audit Report: IG-0387 Type A Accident Investigation Board Report on the January 17, 1996, Electrical Accident With Injury in Building 209, Technical Area 21, Tritium Science and Fabrication Facility, Los Alamos

  5. Inspection Report: IG-0604 | Department of Energy

    Office of Environmental Management (EM)

    04 Inspection Report: IG-0604 June 2, 2003 Inspection of Savannah River Operations Office Management of Emergency Response and Law Enforcement-Related Grants The Office of Inspector General (OIG) conducted an inspection of select grants funded by the Department of Energy (DOE) Savannah River Operations Office (SRO). Specifically, the purpose of this inspection was to review the oversight and management of grant monies awarded by SRO for emergency response and law enforcement-related activities.

  6. Inspection Report: IG-0755 | Department of Energy

    Office of Environmental Management (EM)

    5 Inspection Report: IG-0755 January 23, 2007 Review of the Department of Energy's Canine Program at Selected Sites An essntial element of the Department of Energy's (Department) efforts to identify and deter potential threats to its facilities and personnel is the Department Canine Program. PDF icon Inspection Report: IG-0755 More Documents & Publications Inspection Report: IG-0886 Inspection Report: INS-O-12-02 Special Report: IG-0868

  7. Inspection Report: IG-0372 | Department of Energy

    Energy Savers [EERE]

    2 Inspection Report: IG-0372 May 9, 1995 Inspection of Power Purchase Contracts at the Western Area Power Administration PDF icon Inspection Report: IG-0372 More Documents & Publications EIS-0171: Final Environmental Impact Statement QER - Comment of American Public Power Association 5 Microsoft Word - competitionincontractingguidev2.doc

  8. Inspection Report: INS-9502 | Department of Energy

    Energy Savers [EERE]

    9502 Inspection Report: INS-9502 July 26, 1995 Report on Inspection of Analytical Laboratories Oversight at the Strategic Petroleum Reserve PDF icon Inspection Report: INS-9502 More Documents & Publications Audit Report: IG-0370 LWZ-0026 - In the Matter of Boeing Petroleum Services, Inc. LWA-0005 - In the Matter of Francis M. O'Laughlin

  9. Inspection Report: IG-0369 | Department of Energy

    Office of Environmental Management (EM)

    9 Inspection Report: IG-0369 March 22, 1995 Report on Inspection of Los Alamos National Laboratory's System for Controlling Cost Overruns on Work-for-Others Projects PDF icon Inspection Report: IG-0369 More Documents & Publications Audit Report: OAS-M-14-03 FY 2009 LDRD Report Audit Report: DOE/IG-0917

  10. Planning and Reporting for Operations and Maintenance in Federal Energy Savings Performance Contracts

    Broader source: Energy.gov [DOE]

    Document provides guidance on energy savings performance contract (ESPC) project development for allocating operations and maintenance (O&M) and repair and replacement (R&R) responsibilities and putting in place O&M reporting requirements. The goal is to minimize disagreements between federal agencies and energy service companies (ESCOs) over O&M and R&R and to help ensure that savings persist during performance period.

  11. Expert Meeting Report: Key Innovations for Adding Energy Efficiency to Maintenance Projects

    SciTech Connect (OSTI)

    Wood, A.; Wiehagen, J.

    2012-09-01

    This report describes an expert meeting hosted by the Building America research team NAHB Research Center, which was held on February 8, 2012, in Orlando, Florida. The topic, Key Innovations for Adding Energy Efficiency to Maintenance Projects, was intended to provide direction to more focused efforts to increase the efficiency of existing homes; in this meeting, the focus was specifically for re-roofing and the opportunities for adding energy efficiency upgrades during this major home repair activity.

  12. Inspection Report INS-O-15-03 | Department of Energy

    Office of Environmental Management (EM)

    Report INS-O-15-03 Inspection Report INS-O-15-03 February 24, 2015 Submission and Maintenance of Patents at Sandia National Laboratories The National Nuclear Security Administration is responsible for the management of the nation's weapons complex, which includes Sandia National Laboratories, operated by Sandia Corporation. Sandia Corporation's Technology Transfer Program involves the submission of patent applications resulting from Sandia National Laboratories' research and development efforts.

  13. Operations & Maintenance Best Practices Guide: Chapter 3

    Broader source: Energy.gov [DOE]

    Guide describes chapter 3 of the Operations & Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  14. Visual inspection reliability for precision manufactured parts

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    See, Judi E.

    2015-09-04

    Sandia National Laboratories conducted an experiment for the National Nuclear Security Administration to determine the reliability of visual inspection of precision manufactured parts used in nuclear weapons. In addition visual inspection has been extensively researched since the early 20th century; however, the reliability of visual inspection for nuclear weapons parts has not been addressed. In addition, the efficacy of using inspector confidence ratings to guide multiple inspections in an effort to improve overall performance accuracy is unknown. Further, the workload associated with inspection has not been documented, and newer measures of stress have not been applied.

  15. Inspection Report: S99IS019 | Department of Energy

    Office of Environmental Management (EM)

    9IS019 Inspection Report: S99IS019 June 30, 1999 Inspection of the Chem-Bio Facility at ORNL PDF icon Inspection Report: S99IS019 More Documents & Publications Inspection Report: INS-O-00-01 Inspection Report: IG-0492 Inspection Report: IG-0695

  16. Iron production maintenance effectiveness system

    SciTech Connect (OSTI)

    Augstman, J.J.

    1996-12-31

    In 1989, an internal study in the Coke and Iron Maintenance Department identified the opportunities available to increase production, by decreasing unscheduled maintenance delays from 4.6%. A five year front loaded plan was developed, and presented to the company president. The plan required an initial investment of $1.4 million and a conservative break-even point was calculated to be 2.5 years. Due to budget restraints, it would have to be self-funded, i.e., generate additional production or savings, to pay for the program. The program began in 1991 at number 2 coke plant and the blast furnaces. This paper will describe the Iron Production Maintenance Effectiveness System (ME), which began with the mechanical and pipefitting trades.

  17. Apparatus for inspecting fuel elements

    DOE Patents [OSTI]

    Oakley, David J. (Richland, WA); Groves, Oliver J. (Seattle, WA); Kaiser, Bruce J. (Wilmington, NC)

    1986-01-01

    Disclosed is an alpha monitor usable in an automated nuclear fuel pin loading and processing unit. Fuel pins or other elongated pins are fed laterally into the alpha monitor in a singular fashion and are translated by a first roller assembly into a weld flare machining and decontamination substation not forming a part of the invention. Pins return and are lifted upwardly and transferred across to a combined pin lifting and electrode operating means which lifts the pins upwardly into a clamshell electrode assembly which is spread open by a combined pin lifting and electrode operating means. Once inserted the clamshell type electrode arrangement closes around the fuel pins so that inspection can occur. Fuel pins are inspected by charging electrodes to a negative potential and measuring the change in charge occurring when positively charged alpha particles strike the negatively charged electrodes. After inspection, the fuel pins are lowered by the pin lifting and electrode operating means into a second roller assembly which longitudinally conveys approved pins from the airtight enclosure in which the alpha monitor is mounted. If the fuel pins are rejected then they are moved laterally by a second transfer means and onto another system for further processing.

  18. Apparatus for inspecting fuel elements

    DOE Patents [OSTI]

    Kaiser, B.J.; Oakley, D.J.; Groves, O.J.

    1984-12-21

    This disclosure describes an alpha monitor usable in an automated nuclear fuel pin loading and processing unit. Fuel pins or other elongated pins are fed laterally into the alpha monitor in a singular fashion and are translated by a first roller assembly into a weld flare machining and decontamination substation not forming a part of the invention. Pins return and are lifted upwardly and transferred across to a combined pin lifting and electrode operating means which lifts the pins upwardly into a clamshell electrode assembly which is spread open by a combined pin lifting and electrode operating means. Once inserted the clamshell type electrode arrangement closes around the fuel pins so that inspection can occur. Fuel pins are inspected by charging electrodes to a negative potential and measuring the change in charge occurring when positively charged alpha particles strike the negatively charged electrodes. After inspection, the fuel pins are lowered by the pin lifting and electrode operating means into a second roller assembly which longitudinally conveys approved pins from the airtight enclosure in which the alpha monitor is mounted. If the fuel pins are rejected then they are moved laterally by a second transfer means and onto another system for further processing.

  19. Generative inspection process planner for integrated production

    SciTech Connect (OSTI)

    Brown, C.W. . Kansas City Div.); Gyorog, D.A. . Dept. of Mechanical Engineering)

    1990-04-01

    This work describes the design prototype development of a generative process planning system for dimensional inspection. The system, IPPEX (Inspection Process Planning EXpert), is a rule-based expert system for integrated production. Using as advanced product modeler, relational databases, and artificial intelligence techniques, IPPEX generates the process plan and part program for the dimensional inspection of products using CMMs. Through an application interface, the IPPEX system software accesses product definition from the product modeler. The modeler is a solid geometric modeler coupled with a dimension and tolerance modeler. Resource data regarding the machines, probes, and fixtures are queried from databases. IPPEX represents inspection process knowledge as production rules and incorporates an embedded inference engine to perform decision making. The IPPEX system, its functional architecture, system architecture, system approach, product modeling environment, inspection features, inspection knowledge, hierarchical planning strategy, user interface formats, and other fundamental issues related to inspection planning and part programming for CMMs are described. 27 refs., 16 figs., 4 tabs.

  20. Thermography instruments for predictive maintenance

    SciTech Connect (OSTI)

    Palko, E.

    1993-08-12

    Thermography (infrared imaging, or IR scanning) is not only the most versatile predictive maintenance technology available today; it is, in general, the most cost-effective. Plant engineering can apply a virtually unlimited variety of predictive maintenance instruments, but all are restricted regarding the types of existing and incipient problems they can detect. Inplant applications of thermography, however, are truly limited only by the extent of the plant engineer's imagination. Here are ways that thermography can be used to fight downtime in plants, and factors to consider when selecting the best instrument for particular circumstances.

  1. Maintenance neutron coincidence counter manual

    SciTech Connect (OSTI)

    Krick, M.S.; Polk, P.J.; Atencio, J.D.

    1989-09-01

    A compact thermal-neutron coincidence counter has been constructed specifically for use by the International Atomic Energy Agency as a reference neutron detector for maintenance activities. The counter is designed for use only with {sup 252}Cf sources in SR-CF-100 capsules. This manual describes the detector's mechanical and electrical components and its operating characteristics. 2 refs., 8 figs.

  2. Drive alignment pays maintenance dividends

    SciTech Connect (OSTI)

    Fedder, R.

    2008-12-15

    Proper alignment of the motor and gear drive on conveying and processing equipment will result in longer bearing and coupling life, along with lower maintenance costs. Selecting an alignment free drive package instead of a traditional foot mounted drive and motor is a major advancement toward these goals. 4 photos.

  3. ANNUAL RADIOACTIVE WASTE TANK INSPECTION PROGRAM - 2011

    SciTech Connect (OSTI)

    West, B.; Waltz, R.

    2012-06-21

    Aqueous radioactive wastes from Savannah River Site (SRS) separations and vitrification processes are contained in large underground carbon steel tanks. Inspections made during 2011 to evaluate these vessels and other waste handling facilities along with evaluations based on data from previous inspections are the subject of this report. The 2011 inspection program revealed that the structural integrity and waste confinement capability of the Savannah River Site waste tanks were maintained. All inspections scheduled per SRR-LWE-2011-00026, HLW Tank Farm Inspection Plan for 2011, were completed. Ultrasonic measurements (UT) performed in 2011 met the requirements of C-ESR-G-00006, In-Service Inspection Program for High Level Waste Tanks, Rev. 3, and WSRC-TR-2002-00061, Rev.6. UT inspections were performed on Tanks 25, 26 and 34 and the findings are documented in SRNL-STI-2011-00495, Tank Inspection NDE Results for Fiscal Year 2011, Waste Tanks 25, 26, 34 and 41. A total of 5813 photographs were made and 835 visual and video inspections were performed during 2011. A potential leaksite was discovered at Tank 4 during routine annual inspections performed in 2011. The new crack, which is above the allowable fill level, resulted in no release to the environment or tank annulus. The location of the crack is documented in C-ESR-G-00003, SRS High Level Waste Tank Leaksite Information, Rev.6.

  4. Titanium addition practice, and maintenance for the hearths in AHMSA`s blast furnaces

    SciTech Connect (OSTI)

    Boone, A.G.; Jimenez, G.; Castillo, J.

    1997-12-31

    Altos Hornos de Mexico (AHMSA) is a steel company located in Northern Mexico, in the state of Coahuila. Currently there are three blast furnaces in operation and one more about to finish its general repair. This last one is to remain as a back-up unit. Because of blast furnace hearth wear outs AHMSA has developed some maintenance procedures. These procedures are based on titanium ore additions and hearth thermic control monitoring. There are also some other maintenance practices adopted to the working operations to assure that such operations detect and avoid in time hearth wear outs that place personnel and/or the unit in danger (due to hearth leaks). This paper describes titanium ore addition to No. 2 blast furnace during the final campaign and it also illustrates maintenance practices and continuous monitoring of temperature trends both of which were implemented at AHMSA`s No. 5 blast furnace.

  5. Analyses in support of risk-informed natural gas vehicle maintenance facility codes and standards :

    SciTech Connect (OSTI)

    Ekoto, Isaac W.; Blaylock, Myra L.; LaFleur, Angela Christine; LaChance, Jeffrey L.; Horne, Douglas B.

    2014-03-01

    Safety standards development for maintenance facilities of liquid and compressed gas fueled large-scale vehicles is required to ensure proper facility design and operation envelopes. Standard development organizations are utilizing risk-informed concepts to develop natural gas vehicle (NGV) codes and standards so that maintenance facilities meet acceptable risk levels. The present report summarizes Phase I work for existing NGV repair facility code requirements and highlights inconsistencies that need quantitative analysis into their effectiveness. A Hazardous and Operability study was performed to identify key scenarios of interest. Finally, scenario analyses were performed using detailed simulations and modeling to estimate the overpressure hazards from HAZOP defined scenarios. The results from Phase I will be used to identify significant risk contributors at NGV maintenance facilities, and are expected to form the basis for follow-on quantitative risk analysis work to address specific code requirements and identify effective accident prevention and mitigation strategies.

  6. 2006 Annual Inspection for the

    Office of Legacy Management (LM)

    Durango, Colorado Page 4-1 4.0 Durango, Colorado, Disposal Site 4.1 Compliance Summary The Durango, Colorado, Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I Disposal Site, inspected on June 3, 2014, was in good condition. Vegetation on top of the disposal cell was healthy, and the top and side slopes were relatively free of deep-rooted species. Perimeter sign P1 was missing and will be replaced. One witness corner monument associated with boundary monument BM-4 was bent, and one

  7. System for inspection of stacked cargo containers

    DOE Patents [OSTI]

    Derenzo, Stephen (Pinole, CA)

    2011-08-16

    The present invention relates to a system for inspection of stacked cargo containers. One embodiment of the invention generally comprises a plurality of stacked cargo containers arranged in rows or tiers, each container having a top, a bottom a first side, a second side, a front end, and a back end; a plurality of spacers arranged in rows or tiers; one or more mobile inspection devices for inspecting the cargo containers, wherein the one or more inspection devices are removeably disposed within the spacers, the inspection means configured to move through the spacers to detect radiation within the containers. The invented system can also be configured to inspect the cargo containers for a variety of other potentially hazardous materials including but not limited to explosive and chemical threats.

  8. Security enhanced with increased vehicle inspections

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Security enhanced with increased vehicle inspections Security measures increase as of March: vehicle inspections won't delay traffic New increased security procedures meet LANL's security objectives while minimizing impacts on local businesses and tourists. March 23, 2012 The most prominent change is the increase of random inspections of all vehicles transiting the Laboratory, to include West and East Jemez Roads and roadways leading to the main Laboratory administrative area, Technical Area 3

  9. POST 10/Truck Inspection Station (Map 3

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    POST 10/Truck Inspection Station (Map 3) Changes Effective January 11, 2010 Pajarito Corridor Deliveries: Drivers of commercial delivery trucks headed to the Pajarito Corridor (Pajarito Road bounded by NM Highway 4 and Diamond Drive) must stop at Post 10 for truck inspections. Drivers will then need to present time-stamped inspection passes from Post 10 to protective force offcers stationed at the Pajarito Corridor. (Drivers exiting Post 10 should (1) turn right and proceed west on the Truck

  10. Inspection Report: IG-0488 | Department of Energy

    Energy Savers [EERE]

    8 Inspection Report: IG-0488 November 20, 2000 Inspection of Selected Aspects of the Department of Energy's Classified Document Transmittal Process In view of recent concerns regarding the security of Department of Energy (DOE) classified information, including nuclear weapons information, we initiated an inspection to determine whether officials of the Department and its contractors, including officials of the National Nuclear Security Administration (NNSA) and its contractors, followed the

  11. Inspection Report: IG-0530 | Department of Energy

    Energy Savers [EERE]

    0 Inspection Report: IG-0530 November 9, 2001 Inspection of the Management of Personal Property at the Ashtabula Environmental Management Project The Office of Inspector General (OIG), U.S. Department of Energy, conducted an inspection to review the management of accountable Government-owned personal property at the Department's Ashtabula Environmental Management Project (Ashtabula) in Ashtabula, Ohio. Earthline Technologies (Earthline), formerly RMI Environmental Services, is the Department's

  12. Inspection Report: IG-0536 | Department of Energy

    Energy Savers [EERE]

    6 Inspection Report: IG-0536 December 20, 2001 Follow-on Inspection of the Department of Energy's Value Engineering Program Value Engineering is a recognized management tool which, if properly implemented and executed, can streamline operations, improve quality, and reduce costs. Through the use of methodologies such as Value Engineering, Federal agencies are realizing an average of more than $20 in savings/costs avoidance for each dollar spent on performing the value effort. PDF icon Inspection

  13. Inspection Report: IG-0576 | Department of Energy

    Energy Savers [EERE]

    6 Inspection Report: IG-0576 November 26, 2002 Inspection of Nuclear Safety At The Ashtabula Environmental Management Project The Office of Inspector General, U.S. Department of Energy (DOE), conducted an inspection to review issues related to nuclear safety at the Department's Ashtabula Environmental Management Project (Ashtabula) in Ashtabula, Ohio. The Ashtabula Site is owned by the RMI Titanium Company (RMI) and is comprised of two facilities, the Extrusion Plant and the Metals Plant.

  14. Inspection Report: IG-0587 | Department of Energy

    Energy Savers [EERE]

    87 Inspection Report: IG-0587 February 21, 2003 Inspection Firearms Internal Controls at Los Alamos National Laboratory The Department of Energy's (DOE) Los Alamos National Laboratory (LANL) maintains 1,643 firearms for use by its protective force contractor, Protection Technology Los Alamos (PTLA), and its Security and Safeguards and Dynamic Experimentation Divisions. Firearms are considered sensitive items by DOE and are subject to strict inventory controls. The purpose of this inspection was

  15. Inspection Report: IG-0660 | Department of Energy

    Energy Savers [EERE]

    0 Inspection Report: IG-0660 August 30, 2004 Inspection Report on "Internal Controls Over the Accountability of Computers at Sandia National Laboratory, New Mexico The Office of Inspector General initiated an inspection to determine the adequacy of internal controls over the extensive inventory of laptop and desktop computers at Sandia National Laboratory, New Mexico. Computers are used in the full range of operations at Sandia, to include processing classified information. Department of

  16. F Reactor Inspection | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    F Reactor Inspection F Reactor Inspection Addthis Description Workers from Mission Support Alliance, LLC., removed the welds around the steel door of the F Reactor last week before stepping inside the reactor to complete its periodic inspection. This is the first time the Department of Energy (DOE) has had the reactor open since 2008. The F Reactor is one of nine reactors along the Columbia River at the Department's Hanford Site in southeastern Washington State, where environmental cleanup has

  17. INSPECTION REPORT Allegations Regarding Management of Highly

    Office of Environmental Management (EM)

    Management of Highly Enriched Uranium INS-L-15-03 September 2015 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 September 1, 2015 MEMORANDUM FOR THE ADMINISTRATOR, NATIONAL NUCLEAR SECURITY ADMINISTRATION FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Inspection Report: "Allegations Regarding Management of Highly Enriched Uranium"

  18. INSPECTION REPORT Government Vehicle Utilization at Lawrence

    Office of Environmental Management (EM)

    Government Vehicle Utilization at Lawrence Livermore National Laboratory INS-O-15-01 October 2014 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 October 7, 2014 MEMORANDUM FOR THE ADMINISTRATOR, NATIONAL NUCLEAR SECURITY ADMINISTRATION FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections SUBJECT: INFORMATION: Inspection Report on "Government Vehicle Utilization at Lawrence Livermore

  19. Independent Oversight Inspection, Sandia National Laboratories, Summary

    Office of Environmental Management (EM)

    Report - February 2003 | Department of Energy Laboratories, Summary Report - February 2003 Independent Oversight Inspection, Sandia National Laboratories, Summary Report - February 2003 February 2003 Inspection of Environment, Safety, and Health and Emergency Management at the Sandia National Laboratories This report provides a summary of the results of an inspection of the environment, safety, and health and emergency management programs at the Department of Energy's (DOE) Sandia National

  20. Inspection Report: IG-0547 | Department of Energy

    Office of Environmental Management (EM)

    47 Inspection Report: IG-0547 March 22, 2002 Licensing of Trade Secrets by Sandia National Laboratories The Office of Inspector General (OIG), U.S. Department of Energy (DOE), initiated an inspection into the facts and circumstances surrounding the issuance of a trade secret license in June 2000 by Sandia National Laboratories (Sandia) at Livermore, California, to Axsun Technologies (Axsun), a private company. This inspection was initiated after the OIG received allegations that the issuance of

  1. Inspection Report: IG-0735 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Inspection Report: IG-0735 August 3, 2006 Destruction of Classified Hard Drives at Sandia National Laboratory-New Mexico Report on Sandia National Laboratory in reference to...

  2. Inspection Report: IG-0438 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    25, 1999 Inspection of Reporting at Oak Ridge of Potential Noncompliances With DOE Price-Anderson Amendments Act Implementing Rules To provide oversight of how well...

  3. Independent Oversight Inspection, Sandia National Laboratories...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Laboratories, Summary Report - February 2003 February 2003 Inspection of Environment, Safety, and Health and Emergency Management at the Sandia National Laboratories...

  4. Augmented Computer Exercise for Inspection Training

    Energy Science and Technology Software Center (OSTI)

    2001-10-08

    ACE-IT is a computer-based training tool developed to simulate an on-site inspection of a facility. Inspectors and hosts practice realistic scenarios to prepare for inspections, to supplement tabletop and mock inspections, and for general training in managed access techniques. A training exercise is conducted between interconnected computer workstations. Participants at each workstation play a role, such as inspector or host, and the exercise permits team-specific actions at each stage of the inspection. Prompts and on-screenmore » menus let the participants know what responses are expected from them to continue the exercise.« less

  5. Inspection Report: IG-0433 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report: IG-0433 December 3, 1998 Inspection of Department of Energy's Conference Policies and Practices The Department of Energy (Department) is a recognized world leader in...

  6. Independent Oversight Inspection, Sandia National Laboratories...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Emergency Management at the Sandia Site Office and Sandia National Laboratories, New Mexico, Volume III This report provides the results of an independent oversight inspection...

  7. Inspection Report: IG-0756 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 Inspection Report: IG-0756 February 2, 2007 Chemical Safety Protocols at the Pantex Plant The Pantex Plant (Pantex) mission includes, among other things, AND OBJECTIVE the...

  8. Inspection Report: IG-0593 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Inspection Report: IG-0593 April 1, 2003 Concerns Related to the Office of International Material Protection and Emergency Cooperation The Office of Inspector General (OIG)...

  9. Inspection Report: IG-0594 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Inspection Report: IG-0594 March 31, 2003 Emergency Medical Coordination Memorandum of Agreement at Brookhaven National Laboratory Because of possible exposure to radioactive and...

  10. Inspection Report: IG-0695 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Inspection Report: IG-0695 July 27, 2005 Coordination of Biological Select Agent Activities at Department of Energy Facilities The emerging threat to homeland security posed by...

  11. Feasibility study for a transportation operations system cask maintenance facility

    SciTech Connect (OSTI)

    Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    1991-01-01

    The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the cask systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.

  12. INS-0-99-01 INSPECTION INSPECTION OF AN ALLEGATION REPORT REGARDING

    Office of Environmental Management (EM)

    9-01 INSPECTION INSPECTION OF AN ALLEGATION REPORT REGARDING THE VOLUNTARY SEPARATION PROGRAM AT THE SAVANNAH RIVER OPERATIONS OFFICE OCTOBER 1998 U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF INSPECTIONS SDepartment of Energy S"Washington, DC 20585 October 5, 1998 MEMORANDUM FOR THE SECRETARY F.OM: Grego H. Friedman Acting Inspector General SUBJECT: INFORMATION: Report on "Inspection of an Allegation Regarding the Voluntary Separation Program at the Savannah River

  13. Operations and Maintenance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Soft Costs Operations and Maintenance Operations and Maintenance Photo of a man, wearing a yellow hard hat, looking at a wall with panels and wires mounted to it. Lower ...

  14. An overview of the nondestructive inspection techniques for coiled tubing and pipe

    SciTech Connect (OSTI)

    Stanley, R.K.

    1996-11-01

    Coiled steel tubing and pipe in the diameter range 20--90 mm (0.75--3.5 in.) are replacing conventional oilfield materials for a variety of purposes including workovers, drilling, production tubing, umbilicals, and flowlines. They offer all the advantages of long tubes with no threaded connections. Because coiled tubing is being produced to high quality standards, it is lasting longer than ever before, and the need has arisen for careful nondestructive inspection at frequent intervals to determine accumulated damage to the string and the need for repair. Currently, derating of used coiled tubing using nondestructive testing (NDT) is not performed. While NDT devices for oilfield tubulars have been well documented, little has been written regarding the NDT of coiled tubing. This paper outlines the current NDT methods used during the manufacture of new tubing and the inspection of used coiled tubing.

  15. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2008

    SciTech Connect (OSTI)

    NSTec Environmental Restoration

    2009-03-19

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2008 and includes inspection and repair activities completed at the following ten CAUs: #2; CAU 400: Bomblet Pit and Five Points Landfill (TTR) #2; CAU 404: Roller Coaster Lagoons and Trench (TTR) #2; CAU 407: Roller Coaster RadSafe Area (TTR) #2; CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR) #2; CAU 424: Area 3 Landfill Complexes (TTR) #2; CAU 426: Cactus Spring Waste Trenches (TTR) #2; CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR) #2; CAU 453: Area 9 UXO Landfill (TTR) #2; CAU 484: Surface Debris, Waste Sites, and Burn Area (TTR) #2; CAU 487: Thunderwell Site (TTR)

  16. Haier Repair Confusion Resolved | Department of Energy

    Office of Environmental Management (EM)

    Haier Repair Confusion Resolved Haier Repair Confusion Resolved April 26, 2010 - 12:28pm Addthis On January 7, 2010, DOE entered into a Consent Decree with Haier America regarding a problem with four models of Haier freezers that resulted in those freezers not achieving their advertised energy efficiency. DOE recently became aware that some consumers eligible for repairs were incorrectly told that they were not eligible. Haier has resolved the problem, and consumers are encouraged to contact

  17. Distribution System Audits, Leak Detection, and Repair: Kirtland Air Force Base Leak Detection and Repair Program

    SciTech Connect (OSTI)

    2009-01-14

    Water Best Management Practice #3 Fact Seet: Outlines how a leak detection and repair program helped Kirtland Air Force Base perform distribution system audits, leak detection, and repair to conserve water site-wide.

  18. Africa's Transport Infrastructure Mainstreaming Maintenance and...

    Open Energy Info (EERE)

    Transport Infrastructure Mainstreaming Maintenance and Management Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Africa's Transport Infrastructure Mainstreaming...

  19. Operations & Maintenance Best Practices Guide: Chapter 6

    Broader source: Energy.gov [DOE]

    Guide describes chapter 6 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  20. Operations & Maintenance Best Practices Guide: Appendix a

    Broader source: Energy.gov [DOE]

    Guide describes Appendix A of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  1. Operations & Maintenance Best Practices Guide: Front Matter

    Broader source: Energy.gov [DOE]

    Guide describes the front matter of the Operations and Maintenance Best Practices: a Guide to Achieving Operational Efficiency.

  2. Operations & Maintenance Best Practices Guide: Appendix d

    Broader source: Energy.gov [DOE]

    Guide describes Appendix D of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  3. Operations & Maintenance Best Practices Guide: Chapter 2

    Broader source: Energy.gov [DOE]

    Guide describes chapter 2 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  4. Operations & Maintenance Best Practices Guide: Chapter 1

    Broader source: Energy.gov [DOE]

    Guide describes chapter 1 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  5. Operations & Maintenance Best Practices Guide: Chapter 5

    Broader source: Energy.gov [DOE]

    Guide describes chapter 5 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  6. Operations & Maintenance Best Practices Guide: Chapter 8

    Broader source: Energy.gov [DOE]

    Guide describes chapter 8 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  7. Operations & Maintenance Best Practices Guide: Chapter 7

    Broader source: Energy.gov [DOE]

    Guide describes chapter 7 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  8. Operations & Maintenance Best Practices Guide: Chapter 10

    Broader source: Energy.gov [DOE]

    Guide describes chapter 10 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  9. Operations & Maintenance Best Practices Guide: Appendix c

    Broader source: Energy.gov [DOE]

    Guide describes Appendix C of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  10. Operations & Maintenance Best Practices Guide: Appendix B

    Broader source: Energy.gov [DOE]

    Guide describes Appendix B of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  11. Operations & Maintenance Best Practices Guide: Chapter 11

    Broader source: Energy.gov [DOE]

    Guide describes chapter 11 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  12. Operations & Maintenance Best Practices Guide: Chapter 9

    Broader source: Energy.gov [DOE]

    Guide describes chapter 9 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  13. Essential Systems Functionality Inspection Criteria, Approach, and Lines of Inquiry, October 16, 2008 (HSS CRAD 64-11 Rev. 2)

    Broader source: Energy.gov [DOE]

    The Essential Systems Functionality (ESF) inspection will evaluate the effectiveness of programs and processes for engineering design and safety basis, construction and installation, configuration management, surveillance testing, maintenance, operations, cognizant system engineer (CSE) and safety system oversight (SSO), and feedback and improvement of selected safety systems. This review will evaluate the effectiveness in maintaining the functionality of these safety systems. The ESF review will be performed in the context of integrated safety management (ISM), although the inspection criteria, activities and lines of inquiry are organized by ESF functional areas rather than ISM principles and core functions.

  14. Results of an effective cable inspection program

    SciTech Connect (OSTI)

    Lenko, J.P.; Charlton, C.B.; Vollkommer, H.T. Jr.

    1995-10-01

    To provide better service to customers and to maximize the service life of distribution underground cables, a cable inspection program began in April of 1992. This inspection program covers medium voltage cable and supplements the minimum AEIC testing requirements done by manufacturers. The AEP program has resulted in preventing substandard and non-specified cables from being placed in service. This program requires manufacturers to send a two foot sample of cable from each shipping reel prior to shipment to the Electrical Laboratory for inspection. The samples are then randomly selected for inspection. Results of each inspection are reported to AEP Operating Companies within five days and are logged into a yearly accumulative data base per manufacturer. During 1993, approximately 108,000 feet of cable were returned to manufacturers which represents about 4.54% of the medium voltage cable received on the AEP System. As a result of this inspection program it appears that several cable manufacturers have improved their product or production system resulting in a cleaner cable, meeting Company and industry standards. Results of these inspections are passed on to their customers through lower costs and a more reliable distribution system. The results of this in-house inspection program are evaluated by Distribution Engineering and sent to Purchasing for their use when preparing blanket purchase orders for cable.

  15. POST-CLOSURE CARE AND INSPECTION PLAN

    Office of Legacy Management (LM)

    B Post-Closure Care and Inspection Plan This page intentionally left blank U.S. Department of Energy Comprehensive Legacy Management and Institutional Controls Plan Doc. No. S03496-8.0-Final Attachment B-Post-Closure Care and Inspection Plan January 2015 Page i Contents Abbreviations ................................................................................................................................. iii 1.0 Introduction

  16. Flexible ultrasonic pipe inspection apparatus

    DOE Patents [OSTI]

    Jenkins, Charles F. (Aiken, SC); Howard, Boyd D. (Augusta, GA)

    1998-01-01

    A flexible, modular ultrasonic pipe inspection apparatus, comprising a flexible, hollow shaft that carries a plurality of modules, including at least one rotatable ultrasonic transducer, a motor/gear unit, and a position/signal encoder. The modules are connected by flexible knuckle joints that allow each module of the apparatus to change its relative orientation with respect to a neighboring module, while the shaft protects electrical wiring from kinking or buckling while the apparatus moves around a tight corner. The apparatus is moved through a pipe by any suitable means, including a tether or drawstring attached to the nose or tail, differential hydraulic pressure, or a pipe pig. The rotational speed of the ultrasonic transducer and the forward velocity of the apparatus are coordinated so that the beam sweeps out the entire interior surface of the pipe, enabling the operator to accurately assess the condition of the pipe wall and determine whether or not leak-prone corrosion damage is present.

  17. Failures and repairs of headers and drums in fossil fired boilers

    SciTech Connect (OSTI)

    Thielsch, H.; Cone, F.

    1995-12-01

    This paper discusses failures which have occurred in a number of thick-walled pressure vessels including superheater and reheat outlet headers, and med and steam drums in fossil fired boilers. It provides details regarding the causes of failure, which range from original manufacturing defects to service-related deterioration such as creep and thermal fatigue. It also provides information regarding inspection techniques which are capable of detecting similar conditions before they have reached dangerous levels of deterioration. Finally, it provides details pertaining to techniques used to successfully repair these pressure vessels when they have failed.

  18. Hanford.gov Site Maintenance - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford.gov Site Maintenance Hanford.gov Site Maintenance Hanford.gov Site Maintenance Hanford.gov Site Maintenance Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Hanford.gov will be undergoing scheduled upgrades and will be unavailable from 7:00 am Saturday, March 19th, 2016 until 5:00pm Sunday, March 20th, 2016. Questions and inquiries regarding this maintenance outage please email Anel Suarez MSA Information Management. Thank you for your patience. If you need

  19. Underground pipe inspection device and method

    DOE Patents [OSTI]

    Germata, Daniel Thomas (Wadsworth, IL)

    2009-02-24

    A method and apparatus for inspecting the walls of an underground pipe from inside the pipe in which an inspection apparatus having a circular planar platform having a plurality of lever arms having one end pivotably attached to one side of the platform, having a pipe inspection device connected to an opposite end, and having a system for pivoting the lever arms is inserted into the underground pipe, with the inspection apparatus oriented with the planar platform disposed perpendicular to the pipe axis. The plurality of lever arms are pivoted toward the inside wall of the pipe, contacting the inside wall with each inspection device as the apparatus is conveyed along a length of the underground pipe.

  20. ANNUAL RADIOACTIVE WASTE TANK INSPECTION PROGRAM 2009

    SciTech Connect (OSTI)

    West, B.; Waltz, R.

    2010-06-21

    Aqueous radioactive wastes from Savannah River Site (SRS) separations and vitrification processes are contained in large underground carbon steel tanks. Inspections made during 2009 to evaluate these vessels and other waste handling facilities along with evaluations based on data from previous inspections are the subject of this report. The 2009 inspection program revealed that the structural integrity and waste confinement capability of the Savannah River Site waste tanks were maintained. All inspections scheduled per LWO-LWE-2008-00423, HLW Tank Farm Inspection Plan for 2009, were completed. All Ultrasonic measurements (UT) performed in 2009 met the requirements of C-ESG-00006, In-Service Inspection Program for High Level Waste Tanks, Rev. 1, and WSRC-TR-2002-00061, Rev.4. UT inspections were performed on Tank 29 and the findings are documented in SRNL-STI-2009-00559, Tank Inspection NDE Results for Fiscal Year 2009, Waste Tank 29. Post chemical cleaning UT measurements were made in Tank 6 and the results are documented in SRNL-STI-2009-00560, Tank Inspection NDE Results Tank 6, Including Summary of Waste Removal Support Activities in Tanks 5 and 6. A total of 6669 photographs were made and 1276 visual and video inspections were performed during 2009. Twenty-Two new leaksites were identified in 2009. The locations of these leaksites are documented in C-ESR-G-00003, SRS High Level Waste Tank Leaksite Information, Rev.4. Fifteen leaksites at Tank 5 were documented during tank wall/annulus cleaning activities. Five leaksites at Tank 6 were documented during tank wall/annulus cleaning activities. Two new leaksites were identified at Tank 19 during waste removal activities. Previously documented leaksites were reactivated at Tanks 5 and 12 during waste removal activities. Also, a very small amount of additional leakage from a previously identified leaksite at Tank 14 was observed.

  1. Uranium at Y-12: Inspection | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Inspection Uranium at Y-12: Inspection Posted: July 22, 2013 - 3:36pm | Y-12 Report | Volume 10, Issue 1 | 2013 Inspection of enriched uranium is performed by dimensional checks...

  2. Relationship of DNA repair processes to mutagenesis and carcinogenesis in mammalian cells. Progress report, August 1, 1977-October 31, 1980

    SciTech Connect (OSTI)

    Evans, H.H.

    1980-10-01

    The objective of this research is to determine the role of DNA repair in mutagenesis and carcinogenesis in mammalian cells. More specifically, mutant strains will be selected which are deficient in various DNA repair pathways. These strains will be studied with regard to (1) the nature of the defect in repair, and (2) the mutability and transformability of the defective cells by various agents as compared to the wild type parental cells. The results to date include progress in the following areas: (1) determination of optimum conditions for growth and maintenance of cells and for quantitative measurement of various cellular parameters; (2) investigation of the effect of holding mutagenized cells for various periods in a density inhibited state on survival and on mutation and transformation frequencies; (3) examination of the repair capabilities of BHK cells, as compared to repair-proficient and repair-deficient human cells and excision-deficient mouse cells, as measured by the reactivation of Herpes simplex virus (HSV) treated with radiation and ethylmethane sulfonate (EMS); (4) initiation of host cell reactivation viral sucide enrichment and screening of survivors of the enrichment for sensitivity to ionizing radiation; and (5) investigation of the toxicity, mutagenicity, and carcinogenicity of various metabolites of 4-nitroquinoline-1-oxide (4-NQO). (ERB)

  3. CRAD, Performance-Based Inspection - November 29, 2011 | Department...

    Broader source: Energy.gov (indexed) [DOE]

    1 Performance-Based Inspection of Environmental Management Systems: Inspection Criteria, approach, and Lines of Inquiry (HSS CRAD 45-38, Rev. 1) This Criteria Review and Approach...

  4. ENERGY STAR Certified Homes, Version 3 (Rev. 07) Inspection Checklists...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ENERGY STAR Certified Homes, Version 3 (Rev. 07) Inspection Checklists for National Program Requirements ENERGY STAR Certified Homes, Version 3 (Rev. 07) Inspection Checklists for ...

  5. 2010 Inspection and Status Report for the Boiling Nuclear Superheater...

    Office of Legacy Management (LM)

    Annual Inspection - Boiling Nuclear Superheat (BONUS) Site, Rincn, Puerto Rico October 2013 Page 1 2013 Inspection and Status Report for the Former Boiling Nuclear Superheater...

  6. RCRA (Resource Conservation and Recovery Act) inspection manual. Final report

    SciTech Connect (OSTI)

    Not Available

    1988-04-22

    The RCRA Inspection Manual is intended to assist RCRA field inspectors in their performance of Compliance Evaluation Inspections of RCRA generators, transporters, and treatment, storage, and disposal facilities. Included in the document are inspection procedures for both interim status and permitted facilities. The guidance also provides inspection checklists to aid the inspectors in their review of facility compliance. The Manual will assist RCRA inspectors and enforcement personnel to: conduct RCRA inspections efficiently and professionally, to determine facility compliance with RCRA regulations, adequately prepare for and conduct inspections at RCRA generators, transporters and TSD's, review facility permits for inspection of permitted facilities, and prepare quality inspection reports.

  7. Reliability Tools for Resonance Inspection of Light Metal Castings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Tools for Resonance Inspection of Light Metal Castings Reliability Tools for Resonance Inspection of Light Metal Castings 2012 DOE Hydrogen and Fuel Cells Program and Vehicle...

  8. Independent Oversight Inspection, Nevada Test Site - June 2007...

    Broader source: Energy.gov (indexed) [DOE]

    Inspection of Emergency Management at the Nevada Test Site This report provides the more detailed results of an inspection of emergency management at the Department of Energy's...

  9. December 4, 2007: NETL's Robotic Pipeline Inspection Tool

    Broader source: Energy.gov [DOE]

    December 4, 2007The Department's National Energy Technology Laboratory announces the development of a new robotic pipeline inspection tool that could revolutionize the pipeline inspection process....

  10. Inspection, Oak Ridge National Laboratory - July 2004 | Department...

    Broader source: Energy.gov (indexed) [DOE]

    4 Inspection of Environment, Safety, and Health Management at the Oak Ridge National Laboratory This report provides the results of an inspection of environment, safety, and health...

  11. Independent Oversight Inspection, Y-12 National Security Complex...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Complex, Volume I - September 2005 Independent Oversight Inspection, Y-12 National Security Complex, Volume I - September 2005 September 2005 Inspection of Environment, Safety, and...

  12. Independent Oversight Inspection, Y-12 National Security Complex...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Complex - June 2008 Independent Oversight Inspection, Y-12 National Security Complex - June 2008 June 2008 Inspection of Environment, Safety, and Health Programs at the Y-12...

  13. Inspection Report: INS-0-99-02 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9, 1999 Inspection of Lawrence Livermore National Laboratory Professional Research or Teaching Leave In March 1999, while conducting other Inspection work, the Department of...

  14. UF{sub 6} cylinder inspections at PGDP

    SciTech Connect (OSTI)

    Lamb, G.W.; Whinnery, W.N.

    1991-12-31

    Routine inspections of all UF{sub 6} cylinders at the Paducah Gaseous Diffusion Plant have been mandated by the Department of Energy. A specific UF{sub 6} cylinder inspection procedure for what items to inspect and training for the operators prior to inspection duty are described. The layout of the cylinder yards and the forms used in the inspections are shown. The large number of cylinders (>30,000) to inspect and the schedule for completion on the mandated time table are discussed. Results of the inspections and the actions to correct the deficiencies are explained. Future inspections and movement of cylinders for relocation of certain cylinder yards are defined.

  15. INTERNAL REPAIR OF PIPELINES REVIEW & EVALUATION OF INTERNAL PIPELINE REPAIR TRIALS REPORT

    SciTech Connect (OSTI)

    Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; George Ritter; Bill Mohr; Matt Boring; Nancy Porter; Mike Sullivan; Chris Neary

    2004-09-01

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is generally ineffective at restoring the pressure containing capabilities of pipelines. Failure pressure for pipe repaired with carbon fiber-reinforced composite liner was greater than that of the un-repaired pipe section with damage, indicating that this type of liner is effective at restoring the pressure containing capability of pipe. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. Development of a comprehensive test plan for this process is recommended for use in the next phase of this project.

  16. Leveraging Service Calls and Emergency Repairs for Energy Efficiency...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Service Calls and Emergency Repairs for Energy Efficiency Marketing Leveraging Service Calls and Emergency Repairs for Energy Efficiency Marketing Better Buildings Residential ...

  17. ANNUAL RADIOACTIVE WASTE TANK INSPECTION PROGRAM 2010

    SciTech Connect (OSTI)

    West, B.; Waltz, R.

    2011-06-23

    Aqueous radioactive wastes from Savannah River Site (SRS) separations and vitrification processes are contained in large underground carbon steel tanks. Inspections made during 2010 to evaluate these vessels and other waste handling facilities along with evaluations based on data from previous inspections are the subject of this report. The 2010 inspection program revealed that the structural integrity and waste confinement capability of the Savannah River Site waste tanks were maintained. All inspections scheduled per SRR-LWE-2009-00138, HLW Tank Farm Inspection Plan for 2010, were completed. Ultrasonic measurements (UT) performed in 2010 met the requirements of C-ESG-00006, In-Service Inspection Program for High Level Waste Tanks, Rev. 3, and WSRC-TR-2002-00061, Rev.6. UT inspections were performed on Tanks 30, 31 and 32 and the findings are documented in SRNL-STI-2010-00533, Tank Inspection NDE Results for Fiscal Year 2010, Waste Tanks 30, 31 and 32. A total of 5824 photographs were made and 1087 visual and video inspections were performed during 2010. Ten new leaksites at Tank 5 were identified in 2010. The locations of these leaksites are documented in C-ESR-G-00003, SRS High Level Waste Tank Leaksite Information, Rev.5. Ten leaksites at Tank 5 were documented during tank wall/annulus cleaning activities. None of these new leaksites resulted in a release to the environment. The leaksites were documented during wall cleaning activities and the waste nodules associated with the leaksites were washed away. Previously documented leaksites were reactivated at Tank 12 during waste removal activities.

  18. Flexible ultrasonic pipe inspection apparatus

    DOE Patents [OSTI]

    Jenkins, C.F.; Howard, B.D.

    1998-06-23

    A flexible, modular ultrasonic pipe inspection apparatus, comprises a flexible, hollow shaft that carries a plurality of modules, including at least one rotatable ultrasonic transducer, a motor/gear unit, and a position/signal encoder. The modules are connected by flexible knuckle joints that allow each module of the apparatus to change its relative orientation with respect to a neighboring module, while the shaft protects electrical wiring from kinking or buckling while the apparatus moves around a tight corner. The apparatus is moved through a pipe by any suitable means, including a tether or drawstring attached to the nose or tail, differential hydraulic pressure, or a pipe pig. The rotational speed of the ultrasonic transducer and the forward velocity of the apparatus are coordinated so that the beam sweeps out the entire interior surface of the pipe, enabling the operator to accurately assess the condition of the pipe wall and determine whether or not leak-prone corrosion damage is present. 7 figs.

  19. Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3

    SciTech Connect (OSTI)

    Leigh, Richard J.

    2012-09-01

    The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

  20. Scheduled Maintenance Periods | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scheduled Maintenance Periods The CNM holds three maintenance periods per year. During these times certain CNM facilities may not be available for user activities. The Sector 26 beamline will not be available, the High-Performance Computing Cluster and nanofabrication facilities often are not available, and other facilities may undergo maintenance for only one or two days. Please contact your CNM Scientific Contact prior to arrival and plan your work visits and schedules accordingly. To better

  1. Addressing Deferred Maintenance, Infrastructure Costs, and Excess

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Facilities at Portsmouth and Paducah | Department of Energy Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities at Portsmouth and Paducah Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities at Portsmouth and Paducah Presentation from the 2015 DOE National Cleanup Workshop by William E. Murphie, Manager, Portsmouth/Paducah Project Office (PPPO). PDF icon Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities at Portsmouth

  2. Improve Operations & Maintenance | Department of Energy

    Energy Savers [EERE]

    Improve Operations & Maintenance Improve Operations & Maintenance Photo of an equipment room in a high-rise commercial office building with red and green equipment. Every building's energy consumption can benefit from rigorous operations and maintenance (O&M) practices. Properly planned and executed O&M is one of the most cost-effective strategies for ensuring equipment longevity, reliability, safety, and energy efficiency in commercial buildings. By one estimate, O&M

  3. On-Site Disposal Facility Inspection Report

    Office of Legacy Management (LM)

    ... Site Inspection na Continue to monitor September-13 Beaver dam has been established in front of culvert. Clear dam if culvert becomes completely blocked 1598 FPA ARA South of S ...

  4. Distributed PV Permitting and Inspection Processes

    SciTech Connect (OSTI)

    Solar Energy Technologies Office

    2010-08-03

    This presentation summarizes case studies of the time and cost involved in the distributed PV permitting and inspection process in three Solar America Cities, Austin, Portland, and Salt Lake City.

  5. Distributed PV Permitting and Inspection Processes

    Broader source: Energy.gov [DOE]

    This presentation summarizes case studies of the time and cost involved in the distributed PV permitting and inspection process in three Solar America Cities, Austin, Portland, and Salt Lake City.

  6. Robotic Wind Turbine Inspection | GE Global Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Advances Wind Turbine Inspection Through Robotic Trials Click to email this to a friend (Opens in new window) Share on Facebook (Opens in new window) Click to share (Opens in new...

  7. Inspection Report: IG-0677 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 Inspection Report: IG-0677 February 22, 2005 Security and Other Issues Related to Out-Processing of Employees at Los Alamos National Laboratory The core mission of the Department...

  8. Part IV: Section E - Inspection and Acceptance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Research and Development (Short Form) (Apr 1984) 1 E.2 Acceptance 1 E.3 Certification 1 ... Research and Development (Short Form) (Apr 1984) The Government has the right to inspect ...

  9. Component with inspection-facilitating features

    DOE Patents [OSTI]

    Marra, John J; Zombo, Paul J

    2014-02-11

    A turbine airfoil can be formed with features to facilitate measurement of its wall thickness. An outer wall of the airfoil can include an outer surface and an inner surface. The outer surface of the airfoil can have an outer inspection target surface, and the inner surface of the airfoil can have an inner inspection target surface. The inner and outer target surfaces can define substantially flat regions in surfaces that are otherwise highly contoured. The inner and outer inspection target surfaces can be substantially aligned with each other. The inner and outer target surfaces can be substantially parallel to each other. As a result of these arrangements, a highly accurate measurement of wall thickness can be obtained. In one embodiment, the outer inspection target surface can be defined by an innermost surface of a groove formed in the outer surface of the outer wall of the airfoil.

  10. Independent Oversight Inspection, Los Alamos National Laboratory...

    Broader source: Energy.gov (indexed) [DOE]

    and Security. The inspection also included an evaluation of the environment, safety, and health management program at the site, the results of which are provided in Volume I to...

  11. FAQS Reference Guide – Facility Maintenance Management

    Broader source: Energy.gov [DOE]

    This reference guide addresses the competency statements in the April 2014 edition of DOE Standard DOE-STD-1181-2014, Facility Maintenance Management Functional Area Qualification Standard.

  12. Pacific Northwest National Laboratory Grounds Maintenance

    SciTech Connect (OSTI)

    2009-08-05

    FEMP Water Efficiency Best Management Practice #4 and #5: Case study overview of the grounds maintenance program for Pacific Northwest National Laboratory.

  13. Supervisory Transmission Lines and Substation Maintenance Manager

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Desert Southwest Region Transmission Lines and Substation Maintenance (G5200) 615...

  14. Inspection Report: IG-0397 | Department of Energy

    Energy Savers [EERE]

    7 Inspection Report: IG-0397 October 7, 1996 Report on Inspection of the Secretary of Energy's Foreign Travel Inspectorl General (IG) conduct a thorough examination of all Secretarial foreign travel from 1993 to December 1995 to include the purpose of each trip, the activities of each Federal participant in each trip, the funding of each trip, and claims for reimbursements for expenses by Federal trip participants. The Secretary also requested that the review include an assessment of travel

  15. Inspection Report: IG-0431 | Department of Energy

    Energy Savers [EERE]

    1 Inspection Report: IG-0431 November 23, 1999 Inspection of Issues Associated With the Department of Energy's Tritium Source Selection Process The Office of Inspector General received a letter dated August 31, 1998 from Senator Strom Thurmond concerning the selection of the tritium production source. The letter stated that information had been received which suggested that certain senior level Department officials may have engaged in a systematic effort to undermine the validity of the

  16. Inspection Report: IG-0445 | Department of Energy

    Energy Savers [EERE]

    45 Inspection Report: IG-0445 May 28, 1999 Inspection of the Department of Energy's Export Licensing Process for Dual-Use and Munitions Commodities On August 26, 1998, the Chairman of the Senate Committee on Governmental Affairs requested that the Inspectors General from the Departments of Commerce, Defense, Energy, State, and Treasury, and the Central Intelligence Agency, update and expand on a 1993 interagency review of the export licensing processes for dual-use and munitions commodities.

  17. Inspection Report: IG-0477 | Department of Energy

    Energy Savers [EERE]

    7 Inspection Report: IG-0477 July 26, 2000 Inspection of Cost Recovery Concerns at the Office of Scientific and Technical Information The Office of Inspector General (OIG), U.S. Department of Energy (DOE), received a complaint concerning possible misuse of cost recovery funds at the Office of Scientific and Technical Information (OSTI). Specifically, it was alleged that: 1) some cost recovery funds from DOE's Office of Defense Programs were placed in OSTI's "general fund" and used for

  18. Inspection Report: IG-0480 | Department of Energy

    Energy Savers [EERE]

    0 Inspection Report: IG-0480 September 1, 2000 Inspection of Gain Sharing Opportunities for the Department of Energy In 1995, the General Services Administration provided guidance on a program known as "GAIN SHARING" where agencies could give cash awards to employees who participate in programs to save travel dollars. This guidance discussed the authority to offer cash awards to employees for obtaining a free coach class ticket with Frequent Flyer benefits earned on official travel and

  19. Inspection Report: IG-0531 | Department of Energy

    Energy Savers [EERE]

    1 Inspection Report: IG-0531 November 13, 2001 Inspection of Cyber Security Standards for Sensitive Personal Information The Office of Inspector General (OIG), U.S. Department of Energy (DOE), identified a concern relating to the cyber security of unclassified sensitive personal information maintained by the Department under the Privacy Act of 1974, and other personal information exempt from disclosure under the Freedom of Information Act (Privacy Act/FOIA personal information). Specifically,

  20. Inspection Report: IG-0778 | Department of Energy

    Energy Savers [EERE]

    78 Inspection Report: IG-0778 October 2, 2007 Inspection Report on The Consolidated Terrorism Watchlist Nomination Process at the Department of Energy The Government-wide effort to place known or suspected terrorists on a national watchlist is a key weapon in the global war on terrorism. Accurate watchlists provide an import tool for national defense and border protection operations. They allow law enforcement and intelligence personnel to screen and monitor suspected terrorist travel, reducing

  1. Inspection of lithographic mask blanks for defects

    DOE Patents [OSTI]

    Sommargren, Gary E. (Santa Cruz, CA)

    2001-01-01

    A visible light method for detecting sub-100 nm size defects on mask blanks used for lithography. By using optical heterodyne techniques, detection of the scattered light can be significantly enhanced as compared to standard intensity detection methods. The invention is useful in the inspection of super-polished surfaces for isolated surface defects or particulate contamination and in the inspection of lithographic mask or reticle blanks for surface defects or bulk defects or for surface particulate contamination.

  2. Inspection Report: IG-0442 | Department of Energy

    Office of Environmental Management (EM)

    42 Inspection Report: IG-0442 April 1, 1999 Inspection of Selected Issues Regarding the Department of Energy Accident Investigation Program One method used by the Department of Energy (DOE) to promote worker safety is through the Department's accident investigation program. The objectives of the program are, among other things, to enhance safety and health of employees, to prevent the recurrence of accidents, and to reduce accident fatality rates and promote a downward trend in the number and

  3. Inspection Report: IG-0465 | Department of Energy

    Office of Environmental Management (EM)

    5 Inspection Report: IG-0465 March 23, 2000 Inspection of the Department of Energy's Export License Process for Foreign National Visits and Assignments The Fiscal Year 2000 National Defense Authorization Act provided that not later than March 30 of each year, beginning this year, the President shall submit to Congress an annual report on the United States (US) Government's policies and procedures with respect to the export of technologies and technical information with potential military

  4. Inspection Report: IG-0492 | Department of Energy

    Office of Environmental Management (EM)

    92 Inspection Report: IG-0492 February 2, 2001 Inspection of Department of Energy Activities Involving Biological Select Agents The Department of Energy's laboratories, including those managed by the National Nuclear Security Administration, conduct research involving biological select agents and select agent materials (e.g., DNA or select agents and subunits of toxins derived from select agents). For example, the laboratories are currently working to develop detection and response systems to

  5. Inspection Report: IG-0506 | Department of Energy

    Office of Environmental Management (EM)

    06 Inspection Report: IG-0506 June 14, 2001 Inspection of Selected Aspects of the Office of River Protection Performance-Based Incentive Program The Office of River Protection (ORP), which reports to the Office of Environmental Management, is responsible for remediation of the radioactive waste stored in tanks at the Hanford Site in the State of Washington. For Fiscal Year (FY) 2000, ORP established 26 performance-based contract incentives (PBCIs) that provided its management and operating

  6. Inspection Report: IG-0517 | Department of Energy

    Office of Environmental Management (EM)

    17 Inspection Report: IG-0517 August 24, 2001 Inspection of Selected Office of Security and Emergency Operations Firearms Inventories The Department of Energy (DOE) maintains a large inventory of firearms for use by protective forces at numerous DOE sites and for training at the Nonproliferation and National Security Institute (NNSI), formerly the Central Training Academy. Some excess firearms, as well as firearms that are not needed to meet current operational requirements, are stored by the

  7. Inspection Report: IG-0597 | Department of Energy

    Office of Environmental Management (EM)

    7 Inspection Report: IG-0597 April 24, 2003 Inspection of Internal Controls Over Personal Computers at Los Alamos National Laboratory Computers are used extensively in the full range of operations at the Los Alamos National Laboratory (LANL), including processing classified national security information. LANL reported an inventory of approximately 5,000 laptop and 30,000 desktop computers at the end of Fiscal Year (FY) 2002. Department of Energy (DOE) and LANL property policies identify

  8. Inspection Report: IG-0656 | Department of Energy

    Office of Environmental Management (EM)

    6 Inspection Report: IG-0656 August 10, 2004 Internal Controls Over Personal Computers at Los Alamos National Laboratory The Office of Inspector General initiated an inspection to determine the adequacy of internal controls over the extensive inventory of laptop computers at Los Alamos National Laboratory (LANL). Computers are used in the full range of operations at LANL, to include processing classified information. Department of Energy (DOE) and LANL property policies identify computers as

  9. Inspection Report: IG-0693 | Department of Energy

    Office of Environmental Management (EM)

    93 Inspection Report: IG-0693 June 17, 2005 Review of Security at the Strategic Petroleum Reserve The Office of Inspector General initiated an inspection of security at the Department of Energy's (DOE) Strategic Petroleum Reserve (SPR). The SPR is the United States' emergency stockpile of crude oil and was established in response to the 1973- 1974 oil embargo. The reserve currently stores approximately 695 million barrels of oil in underground salt caverns located in Louisiana and Texas. The SPR

  10. Independent Oversight Inspection, Lawrence Livermore National Laboratory- June 2005

    Broader source: Energy.gov [DOE]

    Inspection of Emergency Management at the Livermore Site Office and Lawrence Livermore National Laboratory

  11. Independent Oversight Inspection, Thomas Jefferson National Accelerator Facility- August 2008

    Broader source: Energy.gov [DOE]

    Inspection of Environment, Safety and Health Programs at the Thomas Jefferson National Accelerator Facility

  12. Independent Oversight Inspection, Oak Ridge National Laboratory- October 2008

    Broader source: Energy.gov [DOE]

    Inspection of Nuclear Safety at the Oak Ridge National Laboratory Radiochemical Engineering Development Center, Building 7920

  13. Independent Oversight Inspection, Lawrence Livermore National Laboratory- May 2007

    Broader source: Energy.gov [DOE]

    Inspection of Environment, Safety, and Health Programs at the Lawrence Livermore National Laboratory

  14. Inspection Report: INS-O-01-02

    Broader source: Energy.gov [DOE]

    Inspection of Selected Coordination Activities by the Department of Energy’s Office of Transportation Safeguards

  15. Inspection Report: S01IS007 | Department of Energy

    Energy Savers [EERE]

    1IS007 Inspection Report: S01IS007 December 14, 2007 Facility Representative Certification at the Chicago Operations Office Not Available for Viewing More Documents & Publications Inspection Report: IG-0633 Inspection Report: S99IS022 Inspection Report: S02IS020

  16. Inspection Report: S99IS022 | Department of Energy

    Energy Savers [EERE]

    S99IS022 Inspection Report: S99IS022 December 1, 1999 Lawrence Livermore National Laboratory Domestic Partner Travel Not Available for Viewing More Documents & Publications Inspection Report: IG-0534 Inspection Report: S05IS022 Inspection Report: INS-L-11-05

  17. Independent Oversight Inspection, Savannah River Site- December 2009

    Broader source: Energy.gov [DOE]

    Inspection of Reinforced Concrete Construction at the Savannah River Site Mixed Oxide Fuel Fabrication Facility

  18. Independent Oversight Inspection, Savannah River Site, Summary Report- February 2004

    Broader source: Energy.gov [DOE]

    Inspection of Environment, Safety, and Health Management and Emergency Management at the Savannah River Site

  19. Independent Oversight Inspection, Idaho National Laboratory- August 2007

    Broader source: Energy.gov [DOE]

    Inspection of Environment, Safety, and Health Programs at the Idaho National Laboratory's Materials and Fuels Complex

  20. Inspection Report: INS-O-99-01

    Broader source: Energy.gov [DOE]

    Inspection of an Allegation Regarding the Voluntary Separation Program at the Savannah River Operations Office

  1. Independent Oversight Inspection, Pacific Northwest National Laboratory- December 2003

    Broader source: Energy.gov [DOE]

    Inspection of Environment, Safety, and Health Management at the Pacific Northwest National Laboratory

  2. Independent Oversight Inspection, Lawrence Livermore National Laboratory- February 2009

    Broader source: Energy.gov [DOE]

    Inspection of Emergency Management at the Livermore Site Office and Lawrence Livermore National Laboratory

  3. Independent Oversight Inspection, Idaho National Laboratory- June 2005

    Broader source: Energy.gov [DOE]

    Inspection of Environment, Safety, and Health Programs at the Idaho National Laboratory Advanced Test Reactor

  4. Inspection Report: S95IS017 | Department of Energy

    Office of Environmental Management (EM)

    5IS017 Inspection Report: S95IS017 January 1, 1995 Summary Abstract Report of Inspection on "Alleged Improper Management Actions by the Office of Environment Management Officials" Not Available for Viewing More Documents & Publications Inspection Report: S01IS018 Summary Letter Report: S10IS013 Inspection Report: INS-L-13-02

  5. A Guide to AC Motor Repair and Replacement

    SciTech Connect (OSTI)

    2004-03-01

    This booklet provides helpful information for making informed repair or replace decisions for electric motors.

  6. Electronic Fabrication & Repair | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Electronic Fabrication & Repair The Electronics group provides custom design and fabrication of electronic equipment.. We convert ideas into custom-finished equipment in our shop using ORCAD Schematic Capture and PCB Layout software in conjunction with our PCB machine to make prototype circuit boards in-house. Our technicians also aid in automating and controlling research project instrumentation using Texas Instruments LabView. We repair all kinds of scientific and laboratory electronic and

  7. Surveillance & Maintenance: The Requirements Based Surveillance and

    Energy Savers [EERE]

    Maintenance Review Process (RBSM) | Department of Energy Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Overall direction for surveillance and maintenance of excess facilities is addressed in DOE G 430.1-2, IMPLEMENTATION GUIDE FOR SURVEILLANCE AND MAINTENANCE DURING FACILITY TRANSITION AND DISPOSITION. In addition, the change in

  8. Maintenance for the Millennium: Another Approach

    SciTech Connect (OSTI)

    Sculthorpe, Barruy R.

    2002-07-01

    Nuclear units nationwide are struggling to increase plant reliability and availability while at the same time reduce their operating and maintenance costs. Some very costly investments have been made in programs such as Reliability Centered Maintenance [RCM]. Florida Power and Light's approach at the St. Lucie Nuclear Plant has taken a slightly different approach. Building on our knowledge of the RCM process and an already existing 'World Class' Predictive Maintenance Program, a 'Condition-Based' Maintenance Program that takes advantage of the RCM philosophy and our toolbox full of advanced and highly successful predictive maintenance technologies. These tools currently consist of vibration analysis, lubricant analysis (both physical property and wear metals analysis, thermographic analysis, motor current signature analysis, tribology and process parameter trending. All employed with the intent to evaluate a machines health. This machine health check allows the forecasting of future preventative maintenance [PM's] tasks and the revision of existing PM's to maximize machine performance and eliminate 'no-value-added' maintenance activities/costs. Within the last year, the Condition-Based Maintenance Program has produced a cost saving of approximately $1.5 million dollars. As the program matures, these cost savings will accumulate well into the millennium. (authors)

  9. Planned Audits and Inspections FY 2013 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Planned Audits and Inspections FY 2013 Planned Audits and Inspections FY 2013 Work Plan for FY 2013 A list of audits and inspections planned for FY 2013 by the U.S. Department of Enery, Office of Inspector General, Office of Audits and Inspections PDF icon Planned Audits and Inspections for FY 2013 More Documents & Publications Work Plan FY 2016 Combined Fiscal Year (FY) 2011 Annual Performance Results and FY 2012 Annual Performance Plan Combined Fiscal Year (FY) 2012 Annual Performance

  10. Inspection Report: DOE/IG-0921 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Inspection Report: DOE/IG-0921 Inspection Report: DOE/IG-0921 August 21, 2015 Alleged Fraud, Waste, Abuse and Mismanagement at the Site Office Publically available version of the OUO report issued in September 2014 PDF icon FREQUENTLY REQUESTED FOIA: Inspection Report: DOE/IG-0921 More Documents & Publications INSPECTION REPORT: DOE/IG-0921 Audit Letter Report: INS-L-07-05 Inspection Report: INS-L-12-03

  11. Model Repair Specifications for Low Voltage Induction Motors | Department

    Office of Environmental Management (EM)

    of Energy Model Repair Specifications for Low Voltage Induction Motors Model Repair Specifications for Low Voltage Induction Motors These Model Repair Specifications are intended to cover routine repair and rewind of low-voltage random-wound three-phase AC squirrel cage induction motors. PDF icon Model Repair Specifications for Low Voltage Induction Motors (November 1999) More Documents & Publications DOE Navigant Master Presentation Improving Motor and Drive System Performance - A

  12. Energy and Technology Review: Unlocking the mysteries of DNA repair

    SciTech Connect (OSTI)

    Quirk, W.A.

    1993-04-01

    DNA, the genetic blueprint, has the remarkable property of encoding its own repair following diverse types of structural damage induced by external agents or normal metabolism. We are studying the interplay of DNA damaging agents, repair genes, and their protein products to decipher the complex biochemical pathways that mediate such repair. Our research focuses on repair processes that correct DNA damage produced by chemical mutagens and radiation, both ionizing and ultraviolet. The most important type of DNA repair in human cells is called excision repair. This multistep process removes damaged or inappropriate pieces of DNA -- often as a string of 29 nucleotides containing the damage -- and replaces them with intact ones. We have isolated, cloned, and mapped several human repair genes associated with the nucleotide excision repair pathway and involved in the repair of DNA damage after exposure to ultraviolet light or mutagens in cooked food. We have shown that a defect in one of these repair genes, ERCC2, is responsible for the repair deficiency in one of the groups of patients with the recessive genetic disorder xeroderma pigmentosum (XP group D). We are exploring ways to purify sufficient quantities (milligrams) of the protein products of these and other repair genes so that we can understand their functions. Our long-term goals are to link defective repair proteins to human DNA repair disorders that predispose to cancer, and to produce DNA-repair-deficient mice that can serve as models for the human disorders.

  13. Remote inspection system for hazardous sites

    SciTech Connect (OSTI)

    Redd, J.; Borst, C.; Volz, R.A.; Everett, L.J.

    1999-04-01

    Long term storage of special nuclear materials poses a number of problems. One of these is a need to inspect the items being stored from time to time. Yet the environment is hostile to man, with significant radiation exposure resulting from prolonged presence in the storage facility. This paper describes research to provide a remote inspection capability, which could lead to eliminating the need for humans to enter a nuclear storage facility. While there are many ways in which an RI system might be created, this paper describes the development of a prototype remote inspection system, which utilizes virtual reality technology along with robotics. The purpose of this system is to allow the operator to establish a safe and realistic telepresence in a remote environment. In addition, it was desired that the user interface for the system be as intuitive to use as possible, thus eliminating the need for extensive training. The goal of this system is to provide a robotic platform with two cameras, which are capable of providing accurate and reliable stereographic images of the remote environment. One application for the system is that it might be driven down the corridors of a nuclear storage facility and utilized to inspect the drums inside, all without the need for physical human presence. Thus, it is not a true virtual reality system providing simulated graphics, but rather an augmented reality system, which performs remote inspection of an existing, real environment.

  14. Requirements Based Surveillance and Maintenance Review Process Interview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Form | Department of Energy Based Surveillance and Maintenance Review Process Interview Form Requirements Based Surveillance and Maintenance Review Process Interview Form PDF icon Requirements Based Surveillance and Maintenance Review Process Interview Form More Documents & Publications Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Guidance to Completing the Self-Directed RBSM Interview Form CX-000473: Categorical Exclusion

  15. 2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites

    SciTech Connect (OSTI)

    2013-11-01

    This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management in 2013 at six uranium mill tailings disposal sites reclaimed under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. These activities verified that the UMTRCA Title II disposal sites remain in compliance with license requirements. DOE manages six UMTRCA Title II disposal sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) established at Title 10 Code of Federal Regulations Part 40.28. Reclamation and site transition activities continue at other sites, and DOE ultimately expects to manage approximately 27 Title II disposal sites. Long-term surveillance and maintenance activities and services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective action; and performing administrative, records, stakeholder services, and other regulatory functions. Annual site inspections and monitoring are conducted in accordance with site-specific long-term surveillance plans (LTSPs) and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up inspections, or corrective action. LTSPs and site compliance reports are available online at http://www.lm.doe.gov

  16. X-ray radiography for container inspection

    DOE Patents [OSTI]

    Katz, Jonathan I.; Morris, Christopher L.

    2011-06-07

    Arrangements of X-ray inspection systems are described for inspecting high-z materials in voluminous objects such as containers. Inspection methods may involve generating a radiographic image based on detected attenuation corresponding to a pulsed beams of radiation transmitted through a voluminous object. The pulsed beams of radiation are generated by a high-energy source and transmitted substantially downward along an incident angle, of approximately 1.degree. to 30.degree., to a vertical axis extending through the voluminous object. The generated radiographic image may be analyzed to detect on localized high attenuation representative of high-z materials and to discriminate high-z materials from lower and intermediate-z materials on the basis of the high density and greater attenuation of high-z material for higher energy (3-10 MeV) X-rays, and the compact nature of threatening masses of fissionable materials.

  17. Vicinal light inspection of translucent materials

    DOE Patents [OSTI]

    Burns, Geroge R. (Albuquerque, NM); Yang, Pin (Albuquerque, NM)

    2010-01-19

    The present invention includes methods and apparatus for inspecting vicinally illuminated non-patterned areas of translucent materials. An initial image of the material is received. A second image is received following a relative translation between the material being inspected and a device generating the images. Each vicinally illuminated image includes a portion having optimal illumination, that can be extracted and stored in a composite image of the non-patterned area. The composite image includes aligned portions of the extracted image portions, and provides a composite having optimal illumination over a non-patterned area of the material to be inspected. The composite image can be processed by enhancement and object detection algorithms, to determine the presence of, and characterize any inhomogeneities present in the material.

  18. Contoured Surface Eddy Current Inspection System

    DOE Patents [OSTI]

    Batzinger, Thomas James; Fulton, James Paul; Rose, Curtis Wayne; Perocchi, Lee Cranford

    2003-04-08

    Eddy current inspection of a contoured surface of a workpiece is performed by forming a backing piece of flexible, resiliently yieldable material with a contoured exterior surface conforming in shape to the workpiece contoured surface. The backing piece is preferably cast in place so as to conform to the workpiece contoured surface. A flexible eddy current array probe is attached to the contoured exterior surface of the backing piece such that the probe faces the contoured surface of the workpiece to be inspected when the backing piece is disposed adjacent to the workpiece. The backing piece is then expanded volumetrically by inserting at least one shim into a slot in the backing piece to provide sufficient contact pressure between the probe and the workpiece contoured surface to enable the inspection of the workpiece contoured surface to be performed.

  19. Resonant frequency method for bearing ball inspection

    DOE Patents [OSTI]

    Khuri-Yakub, B.T.; Chungkao Hsieh.

    1993-11-02

    The present invention provides for an inspection system and method for detecting defects in test objects which includes means for generating expansion inducing energy focused upon the test object at a first location, such expansion being allowed to contract, thereby causing pressure wave within and on the surface of the test object. Such expansion inducing energy may be provided by, for example, a laser beam or ultrasonic energy. At a second location, the amplitudes and phases of the acoustic waves are detected and the resonant frequencies' quality factors are calculated and compared to predetermined quality factor data, such comparison providing information of whether the test object contains a defect. The inspection system and method also includes means for mounting the bearing ball for inspection. 5 figures.

  20. Resonant frequency method for bearing ball inspection

    DOE Patents [OSTI]

    Khuri-Yakub, B. T. (Palo Alto, CA); Hsieh, Chung-Kao (Stanford, CA)

    1993-01-01

    The present invention provides for an inspection system and method for detecting defects in test objects which includes means for generating expansion inducing energy focused upon the test object at a first location, such expansion being allowed to contract, thereby causing pressure wave within and on the surface of the test object. Such expansion inducing energy may be provided by, for example, a laser beam or ultrasonic energy. At a second location, the amplitudes and phases of the acoustic waves are detected and the resonant frequencies' quality factors are calculated and compared to predetermined quality factor data, such comparison providing information of whether the test object contains a defect. The inspection system and method also includes means for mounting the bearing ball for inspection.

  1. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-06-01

    To define the program for the management of cost-effective maintenance of Department of Energy (DOE) nuclear facilities. Guidance for compliance with this Order is contained in DOE G 433.1-1, Nuclear Facility Maintenance Management Program Guide for use with DOE O 433.1, which references Federal regulations, DOE directives, and industry best practices using a graded approach to clarify requirements and guidance for maintaining DOE-owned Government property. (Cancels DOE 4330.4B, Chapter II, Maintenance Management Program, dated 2-10-94.) Cancels DOE 4330.4B (in part). Canceled by DOE O 433.1A.

  2. Major NERSC Maintenance Tuesday November 11

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Major NERSC Maintenance Tuesday November 11 Major NERSC Maintenance Tuesday November 11 October 31, 2014 by Francesca Verdier There will be a major NERSC maintenance on Tuesday, November 11, from 08:00 until 18:00 PST. Several systems and services will be unavailable during this time. Edison, Hopper, Data Transfer nodes, and Science Gateway (data portal) nodes will be unavailable 08:00 - 13:00. Carver/Dirac, PDSF, and Genepool will be unavailable 08:00 - 18:00. HPSS and web servers

  3. 2013 Annual Site Inspection and Monitoring Report for Uranium...

    Office of Scientific and Technical Information (OSTI)

    results of long-term surveillance and maintenance activities conducted by the U.S. ... LTSP. Long-term surveillance and maintenance services for these disposal sites ...

  4. 2013 Annual Site Inspection and Monitoring Report for Uranium...

    Office of Scientific and Technical Information (OSTI)

    results of long-term surveillance and maintenance activities conducted by the U.S. ... Long-term surveillance and maintenance activities and services for these disposal sites ...

  5. Multi-level scanning method for defect inspection

    DOE Patents [OSTI]

    Bokor, Jeffrey (Oakland, CA); Jeong, Seongtae (Richmond, CA)

    2002-01-01

    A method for performing scanned defect inspection of a collection of contiguous areas using a specified false-alarm-rate and capture-rate within an inspection system that has characteristic seek times between inspection locations. The multi-stage method involves setting an increased false-alarm-rate for a first stage of scanning, wherein subsequent stages of scanning inspect only the detected areas of probable defects at lowered values for the false-alarm-rate. For scanning inspection operations wherein the seek time and area uncertainty is favorable, the method can substantially increase inspection throughput.

  6. Exposure Evaluation for Benzene, Lead and Noise in Vehicle and Equipment Repair Shops

    SciTech Connect (OSTI)

    Sweeney, Lynn C.

    2013-04-10

    An exposure assessment was performed at the equipment and vehicle maintenance repair shops operating at the U. S. Department of Energy Hanford site, in Richland, Washington. The maintenance shops repair and maintain vehicles and equipment used in support of the Hanford cleanup mission. There are three general mechanic shops and one auto body repair shop. The mechanics work on heavy equipment used in construction, cranes, commercial motor vehicles, passenger-type vehicles in addition to air compressors, generators, and farm equipment. Services include part fabrication, installation of equipment, repair and maintenance work in the engine compartment, and tire and brake services. Work performed at the auto body shop includes painting and surface preparation which involves applying body filler and sanding. 8-hour time-weighted-average samples were collected for benzene and noise exposure and task-based samples were collected for lead dust work activities involving painted metal surfaces. Benzene samples were obtained using 3M™ 3520 sampling badges and were analyzed for additional volatile organic compounds. These compounds were selected based on material safety data sheet information for the aerosol products used by the mechanics for each day of sampling. The compounds included acetone, ethyl ether, toluene, xylene, VM&P naphtha, methyl ethyl ketone, and trichloroethylene. Laboratory data for benzene, VM&P naphtha, methyl ethyl ketone and trichloroethylene were all below the reporting detection limit. Airborne concentrations for acetone, ethyl ether, toluene and xylene were all less than 10% of their occupational exposure limit. The task-based samples obtained for lead dusts were submitted for a metal scan analysis to identify other metals that might be present. Laboratory results for lead dusts were all below the reporting detection limit and airborne concentration for the other metals observed in the samples were less than 10% of the occupational exposure limit. Noise dosimetry sampling was performed on a random basis and was representative of the different work activities within the four shops. Twenty three percent of the noise samples exceeded the occupational exposure limit of 85 decibels for an 8-hour time-weightedaverage. Work activities where noise levels were higher included use of impact wrenches and grinding wheels.

  7. BPAT Systems Maintenance - December 12, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 12122014 BPAT's e-Tag and OASIS software vendor will be performing a...

  8. BPAT Systems Maintenance - November 5, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 1152014 BPAT's e-Tag and OASIS software vendor will be performing a...

  9. BPAT Systems Maintenance - February 9, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 292015 BPAT's e-Tag and OASIS software vendor will be performing a...

  10. BPAT Systems Maintenance - March 6, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 362015 BPAT's e-Tag and OASIS software vendor will be performing a...

  11. Sound maintenance practices protect fan investments

    SciTech Connect (OSTI)

    Bauer, M.

    2009-11-15

    Since underground coal miners depend on axial fans, lack of maintenance could prove costly. A number of pre-emptive actions that can help keep fans running at optimal performance can also be taken. 2 photos.

  12. Website Maintenance Process and Template | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Website Maintenance Process and Template Website Maintenance Process and Template Below you can read more about EERE's expectations for website maintenance. In June and December every year, Web coordinators will be asked to attend two special Web Governance Team meetings to report on their website maintenance plans for the rest of the fiscal year. Fill out the Web maintenance template before attending this meeting and email it to the WGT facilitator. File Website maintenance process Microsoft

  13. Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Vehicle Maintenance to Conserve Fuel to someone by E-mail Share Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Facebook Tweet about Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Twitter Bookmark Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Google Bookmark Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Delicious Rank Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Digg Find

  14. Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Vehicle Maintenance and Safety to someone by E-mail Share Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Facebook Tweet about Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Twitter Bookmark Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Google Bookmark Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Delicious Rank Alternative Fuels Data Center: Natural Gas Vehicle Maintenance

  15. Alkylation damage repair in mammalian genomes

    SciTech Connect (OSTI)

    Mitra, S.; Roy, R.; Kim, N.K. |; Tano, K. |; Ibeanu, G.C. |; Dunn, W.C.; Natarajan, A.T.; Hartenstein, B.; Kaina, B.

    1992-11-01

    The repair of O{sup 6} -alkylguanine in DNA involves only O{sup 6} -methyltransferase (MGMT) while the repair of N-alkylpurines requires multiple proteins including N-methylpurine-DNA glycosylase (MPG). While the biochemical properties human and mouse MGMTs are very similar, the mouse MPG removes 7-methylguanine more efficiently than the human protein. An increased level of MGMT, without a change in the level of MPG associated with gene amplification, was observed in a mouse cell line resistant to 2-chloroethyl-N-nitrosourea. In contrast, no correlation was observed between MPG level and resistance to methyl methanesulfonate in Chinese hamster ovary (CHO) cells. This result suggests a protein other than MPG limits the repair rate of N-alkylpurine in CHO cells.

  16. Alkylation damage repair in mammalian genomes

    SciTech Connect (OSTI)

    Mitra, S.; Roy, R.; Kim, N.K. . Sealy Center for Molecular Science Oak Ridge National Lab., TN ); Tano, K. Oak Ridge National Lab., TN ); Ibeanu, G.C. Oak Ridge National Lab., TN ); Dunn, W.C. (

    1992-01-01

    The repair of O{sup 6} -alkylguanine in DNA involves only O{sup 6} -methyltransferase (MGMT) while the repair of N-alkylpurines requires multiple proteins including N-methylpurine-DNA glycosylase (MPG). While the biochemical properties human and mouse MGMTs are very similar, the mouse MPG removes 7-methylguanine more efficiently than the human protein. An increased level of MGMT, without a change in the level of MPG associated with gene amplification, was observed in a mouse cell line resistant to 2-chloroethyl-N-nitrosourea. In contrast, no correlation was observed between MPG level and resistance to methyl methanesulfonate in Chinese hamster ovary (CHO) cells. This result suggests a protein other than MPG limits the repair rate of N-alkylpurine in CHO cells.

  17. Advanced Remote Maintenance Design for Pilot-Scale Centrifugal...

    Office of Scientific and Technical Information (OSTI)

    Journal Article: Advanced Remote Maintenance Design for Pilot-Scale Centrifugal Contactors Citation Details In-Document Search Title: Advanced Remote Maintenance Design for ...

  18. ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: SPACE AND MAINTENANCE RECORDS ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS This schedule provides for the disposal of all copies, wherever located in the ...

  19. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    is to provide you, the Operations and Maintenance (O&M)Energy manager and practitioner, ... first defer to the manufacturer's recommendations on equipment operation and maintenance. ...

  20. FY 2013 Real Property Deferred, Actual, and Required Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement PDF icon FY ...

  1. How to Determine and Verify Operating and Maintenance Savings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Determine and Verify Operating and Maintenance Savings in Federal Energy Savings Performance Contracts How to Determine and Verify Operating and Maintenance Savings in Federal ...

  2. Project Profile: Innovative Application of Maintenance-Free Phase...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Innovative Application of Maintenance-Free Phase-Change Thermal Energy Storage for Dish Systems Project Profile: Innovative Application of Maintenance-Free Phase-Change Thermal ...

  3. FY 2014 Real Property Data Related to Operations and Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Real Property Data Related to Operations and Maintenance Guidance FY 2014 Real Property Data Related to Operations and Maintenance Guidance PDF icon FY2014DataRelatedtoOperati...

  4. Long-Term Surveillance and Maintenance Requirements for Remediated...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites Long-Term ...

  5. Color Maintenance of LEDs in Laboratory and Field Applications...

    Office of Scientific and Technical Information (OSTI)

    for parametric failure of LED products has largely been focused on lumen maintenance. ... Subject: Light-emitting diode (LED), color shift, color stability, color maintenance, ...

  6. Planning and Reporting for Operations and Maintenance in Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Planning and Reporting for Operations and Maintenance in Federal Energy Savings Performance Contracts Planning and Reporting for Operations and Maintenance in Federal Energy ...

  7. FY 2012 Real Property Deferred, Actual, and Required Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement PDF icon FY ...

  8. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in an efficient manner and that operations and maintenance personnel are well trained. ... entire life including operating costs, maintenance costs, and initial cost. Low flow ...

  9. Hopper scheduled maintenance tomorrow (Sept 19) and /project...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    scheduled maintenance tomorrow (Sept 19) and project outage Hopper scheduled maintenance tomorrow (Sept 19) and project outage September 18, 2012 by Helen He There will be a...

  10. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... lubrication degradation, or by observing any other unhealthy trends that occur over time. ... Centered Maintenance (Pro-Active or Prevention Maintenance) Basic philosophy * ...

  11. Operations & Maintenance Best Practices Guide: Chapter 4 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Operations & Maintenance Best Practices Guide: Chapter 4 Guide to chapter 4 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency. Chapter...

  12. FEMP Offers New Training on Photovoltaic Operations and Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Training on Photovoltaic Operations and Maintenance Best Practices FEMP Offers New Training on Photovoltaic Operations and Maintenance Best Practices November 4, 2014 - 2:40pm ...

  13. Repairable chip bonding/interconnect process

    DOE Patents [OSTI]

    Bernhardt, A.F.; Contolini, R.J.; Malba, V.; Riddle, R.A.

    1997-08-05

    A repairable, chip-to-board interconnect process which addresses cost and testability issues in the multi-chip modules is disclosed. This process can be carried out using a chip-on-sacrificial-substrate technique, involving laser processing. This process avoids the curing/solvent evolution problems encountered in prior approaches, as well is resolving prior plating problems and the requirements for fillets. For repairable high speed chip-to-board connection, transmission lines can be formed on the sides of the chip from chip bond pads, ending in a gull wing at the bottom of the chip for subsequent solder. 10 figs.

  14. Repairable chip bonding/interconnect process

    DOE Patents [OSTI]

    Bernhardt, Anthony F. (Berkeley, CA); Contolini, Robert J. (Livermore, CA); Malba, Vincent (Livermore, CA); Riddle, Robert A. (Tracy, CA)

    1997-01-01

    A repairable, chip-to-board interconnect process which addresses cost and testability issues in the multi-chip modules. This process can be carried out using a chip-on-sacrificial-substrate technique, involving laser processing. This process avoids the curing/solvent evolution problems encountered in prior approaches, as well is resolving prior plating problems and the requirements for fillets. For repairable high speed chip-to-board connection, transmission lines can be formed on the sides of the chip from chip bond pads, ending in a gull wing at the bottom of the chip for subsequent solder.

  15. Inspection Report: IG-0633 | Department of Energy

    Energy Savers [EERE]

    The Security of Uranium Hexafluoride at the East Tennessee Technology Park Not Available for Viewing More Documents & Publications Inspection Report: IG-0633 Semiannual Report to Congress: October 1, 2003 - March 31, 2004 Notice of Change in National Environmental Policy (NEPA) Compliance Approach

  16. Inspection Report: IG-0820 | Department of Energy

    Energy Savers [EERE]

    0 Inspection Report: IG-0820 September 4, 2009 Lawrence Livermore National Laboratory Protective Force Authority The Department of Energy's (Department) Lawrence Livermore National Laboratory (Livermore) is a premier research and development institution supporting the Department's scientific, engineering, environmental, and national security activities. Livermore is managed and operated under contract by Lawrence Livermore National Security (LLNS) LLC, for the Department's National Nuclear

  17. Field Inspection Guidelines for PV Systems

    Broader source: Energy.gov [DOE]

    This 2010 update to the 2006 edition consolidates the most import aspects of a field inspection into a simple process that can be performed in as little as 15 minutes. Explanations and illustrative pictures are included to instruct the inspector on the specific details of each step.

  18. Explosion proof vehicle for tank inspection

    DOE Patents [OSTI]

    Zollinger, William T. (Idaho Falls, ID); Klingler, Kerry M. (Idaho Falls, ID); Bauer, Scott G. (Idaho Falls, ID)

    2012-02-28

    An Explosion Proof Vehicle (EPV) having an interior substantially filled with an inert fluid creating an interior pressure greater than the exterior pressure. One or more flexible tubes provide the inert fluid and one or more electrical conductors from a control system to the vehicle. The vehicle is preferably used in subsurface tank inspection, whereby the vehicle is submerged in a volatile fluid.

  19. Inspection Report: IG-0762 | Department of Energy

    Office of Environmental Management (EM)

    62 Inspection Report: IG-0762 March 28, 2007 Internal Controls Over Computer Property at the Department's Counterintelligence Directorate The Office of Intelligence and Counterintelligence conducts AND OBJECTIVE technical analyses of foreign intelligence for the Department of Energy (DOE), including the National Nuclear Security Administration, and the United States Intelligence Community. The Counterintelligence Directorate (CN), which is part of the Office of Intelligence and

  20. Methods and apparatus for multi-parameter acoustic signature inspection

    DOE Patents [OSTI]

    Diaz, Aaron A. (Richland, WA); Samuel, Todd J. (Pasco, WA); Valencia, Juan D. (Kennewick, WA); Gervais, Kevin L. (Richland, WA); Tucker, Brian J. (Pasco, WA); Kirihara, Leslie J. (Richland, WA); Skorpik, James R. (Kennewick, WA); Reid, Larry D. (Benton City, WA); Munley, John T. (Benton City, WA); Pappas, Richard A. (Richland, WA); Wright, Bob W. (West Richland, WA); Panetta, Paul D. (Richland, WA); Thompson, Jason S. (Richland, WA)

    2007-07-24

    A multiparameter acoustic signature inspection device and method are described for non-invasive inspection of containers. Dual acoustic signatures discriminate between various fluids and materials for identification of the same.

  1. Independent Oversight Inspection, Los Alamos National Laboratory - February

    Broader source: Energy.gov (indexed) [DOE]

    2007 | Department of Energy February 2007 Inspection of Emergency Management at the Los Alamos Site Office and Los Alamos National Laboratory This report provides the more detailed results of an inspection of emergency management at the Department of Energy's (DOE) Nevada Test Site. The inspection was conducted in March and April 2007 by the DOE Office of Independent Oversight's Office of Emergency Management Oversight, within the DOE Office of Health, Safety and Security. The inspection

  2. Inspection Report: INS-L-11-04

    Broader source: Energy.gov [DOE]

    Inspection Report on Allegations of Suspect Parts in Sun Microsystems Processors at Sandia National Laboratories - New Mexico

  3. Independent Oversight Inspection, Y-12 National Security Complex - June

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2008 | Department of Energy Complex - June 2008 Independent Oversight Inspection, Y-12 National Security Complex - June 2008 June 2008 Inspection of Environment, Safety, and Health Programs at the Y-12 National Security Complex This report provides the results of an inspection of the environment, safety, and health programs at the Department of Energy's (DOE) Y-12 Site Office and Y-12 National Security Complex. The inspection was conducted from March through May 2008 by the DOE Office of

  4. Innovation and Success in Solar Permitting and Inspection | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Permitting and Inspection Innovation and Success in Solar Permitting and Inspection This document summarizes several successful initiatives to streamline and standardize permitting requirements for local solar photovoltaic (PV) projects. PDF icon webinar_062613_solar_permitting_inspections.pdf More Documents & Publications webinar_innovation_permitting_inspections.doc SunShot Prize Race to 7-Day Solar text_alternative_stat_webinar_2012_7_25.docx

  5. EERE Success Story-Promising Inspection Technique for Vehicle Welding

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Offers Efficient Alternative | Department of Energy Promising Inspection Technique for Vehicle Welding Offers Efficient Alternative EERE Success Story-Promising Inspection Technique for Vehicle Welding Offers Efficient Alternative April 22, 2015 - 2:06pm Addthis ORNL researcher Jian Chen works with the prototype weld inspection system licensed by Tennessee-based APLAIR Manufacturing Systems. ORNL researcher Jian Chen works with the prototype weld inspection system licensed by Tennessee-based

  6. Appendix B Landfill Inspection Forms and Survey Data

    Office of Legacy Management (LM)

    B Landfill Inspection Forms and Survey Data This page intentionally left blank This page intentionally left blank Original Landfill January 2012 Monthly Inspection-Attachment 1 The monthly inspection of the OLF was completed on January 30. The Rocky Flats Site only received .15 inches of precipitation during the month of January. The cover was dry at the time of the inspection. The slump in the East Perimeter Channel (EPC) remained unchanged. Berm locations that were re-graded during the OLF

  7. Independent Oversight Inspection, Savannah River Site Office - December

    Energy Savers [EERE]

    2009 | Department of Energy Office - December 2009 Independent Oversight Inspection, Savannah River Site Office - December 2009 December 2009 Inspection of Nuclear Safety at the Savannah River Site Office and the Tritium Program Facilities This report documents the results of an inspection of nuclear safety at several National Nuclear Security Administration (NNSA) facilities located at Department of Energy's (DOE) Savannah River Site. The inspection was performed during August and September

  8. Promising Inspection Technique for Vehicle Welding Offers Efficient

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Alternative | Department of Energy Promising Inspection Technique for Vehicle Welding Offers Efficient Alternative Promising Inspection Technique for Vehicle Welding Offers Efficient Alternative April 22, 2015 - 2:06pm Addthis ORNL researcher Jian Chen works with the prototype weld inspection system licensed by Tennessee-based APLAIR Manufacturing Systems. ORNL researcher Jian Chen works with the prototype weld inspection system licensed by Tennessee-based APLAIR Manufacturing Systems. The

  9. Inspection, Kansas City Plant - May 2004 | Department of Energy

    Office of Environmental Management (EM)

    Kansas City Plant - May 2004 Inspection, Kansas City Plant - May 2004 May 2004 Inspection of Environment, Safety, and Health Management at the Kansas City Plant This report provides the results of an inspection of environment, safety, and health management at the Department of Energy's (DOE) Kansas City Plant. The inspection was conducted in April and May 2004 by the DOE Office of Independent Oversight and Performance Assurance's Office of Environment, Safety and Health Evaluations, within the

  10. Inspection, Sandia National Laboratories - April 2008 | Department of

    Office of Environmental Management (EM)

    Energy Sandia National Laboratories - April 2008 Inspection, Sandia National Laboratories - April 2008 April 2008 Inspection of Environment, Safety and Health Programs at the Sandia National Laboratories This report provides the results of an inspection of the environment, safety, and health programs at the Department of Energy's (DOE) Sandia Site Office and Sandia National Laboratories. The inspection was conducted during January and February 2008 by the DOE Office of Independent

  11. Independent Oversight Inspection, DOE RAP Regions - April 2006 | Department

    Office of Environmental Management (EM)

    of Energy DOE RAP Regions - April 2006 Independent Oversight Inspection, DOE RAP Regions - April 2006 April 2006 Inspection of the Radiological Assistance Program This report provides the results of an independent oversight inspection of the Department of Energy's (DOE) Radiological Assistance Program. The inspection was performed from November 2005 to January 2006 by the Office of Independent Oversight's Office of Emergency Management Oversight, within the DOE Office of Security and Safety

  12. Independent Oversight Inspection, East Tennessee Technology Park - November

    Office of Environmental Management (EM)

    2008 | Department of Energy East Tennessee Technology Park - November 2008 Independent Oversight Inspection, East Tennessee Technology Park - November 2008 November 2008 Inspection of Environment, Safety, and Health Programs at the East Tennessee Technology Park This report provides the results of an inspection of the environment, safety, and health programs at the Department of Energy's (DOE) East Tennessee Technology Park. The inspection was conducted during August and September 2008 by

  13. Independent Oversight Inspection, Office of Secure Transportation - March

    Office of Environmental Management (EM)

    2007 | Department of Energy Office of Secure Transportation - March 2007 Independent Oversight Inspection, Office of Secure Transportation - March 2007 March 2007 Inspection of Emergency Management at the Office of Secure Transportation This report provides the results of an independent oversight inspection of the emergency management program for the Department of Energy's (DOE) Office of Secure Transportation. The inspection was performed in January and February 2007 by the Office of

  14. Independent Oversight Inspection, Pantex Plant - June 2009 | Department of

    Office of Environmental Management (EM)

    Energy Plant - June 2009 Independent Oversight Inspection, Pantex Plant - June 2009 June 2009 Inspection of Environment, Safety, and Health Programs at the Pantex Plant This report documents the results of an inspection of the environment, safety, and health programs at the Department of Energy's (DOE) Pantex Plant. The inspection was performed during March and April 2009 by the DOE Office of Independent Oversight's Office of Environment, Safety and Health Evaluations, which is within the

  15. Independent Oversight Inspection, Pantex Plant, Summary Report - November

    Office of Environmental Management (EM)

    2002 | Department of Energy Plant, Summary Report - November 2002 Independent Oversight Inspection, Pantex Plant, Summary Report - November 2002 November 2002 Inspection of Environment, Safety, and Health and Emergency Management at the Pantex Plant This report provides the more detailed results of an inspection of emergency management at the Department of Energy's (DOE) Pantex Plant. The inspection was conducted in October and November 2002 by the DOE Office of Independent Oversight and

  16. Independent Oversight Inspection, Sandia National Laboratories - May 2005 |

    Office of Environmental Management (EM)

    Department of Energy Laboratories - May 2005 Independent Oversight Inspection, Sandia National Laboratories - May 2005 May 2005 Inspection of Emergency Management at the Sandia Site Office and Sandia National Laboratories, New Mexico, Volume III This report provides the results of an independent oversight inspection of emergency management at the Department of Energy's (DOE) Sandia Site Office and Sandia National Laboratories. The inspection was conducted in March and April 2005 by the

  17. Independent Oversight Inspection, Savannah River Site - January 2010 |

    Office of Environmental Management (EM)

    Department of Energy Savannah River Site - January 2010 Independent Oversight Inspection, Savannah River Site - January 2010 January 2010 Inspection of Emergency Management at the Savannah River Site This report provides the results of an independent oversight inspection of emergency management at the Department of Energy's (DOE) Savannah River Site. The inspection was conducted in August and September 2009 by the Office of Independent Oversight's Office of Emergency Management Oversight,

  18. Independent Oversight Inspection, Y-12 National Security Complex - April

    Office of Environmental Management (EM)

    2003 | Department of Energy Y-12 National Security Complex - April 2003 Independent Oversight Inspection, Y-12 National Security Complex - April 2003 April 2003 Inspection of Environment, Safety, and Health Management at the Y-12 National Security Complex This report provides the results of an inspection of environment, safety, and health management at the Department of Energy's (DOE) Y-12 National Security Complex. The inspection was conducted in March and April 2003 by the Office of

  19. 2009 Annual Inspection and Status Report for the

    Office of Legacy Management (LM)

    4 Annual Inspection - Hallam, Nebraska May 2014 Page 1 2014 Annual Inspection and Status Report for the Hallam, Nebraska, Decommissioned Reactor Site Summary The former Hallam Nuclear Power Facility (HNPF) was inspected on April 8, 2014. The IHX building and the grass cover on the foundation of the former reactor building were in good condition. No cause for a follow-up inspection was identified. There are 19 groundwater monitoring wells at the Hallam site. Four of the 19 wells are flush mount

  20. 2009 Annual Inspection and Status Report for the

    Office of Legacy Management (LM)

    5 Annual Inspection - Hallam, Nebraska May 2015 Page 1 2015 Annual Inspection and Status Report for the Hallam, Nebraska, Decommissioned Reactor Site Summary The former Hallam Nuclear Power Facility (HNPF) was inspected on April 9, 2015. The IHX building and the grass cover on the foundation of the former reactor building were in good condition. No cause for a follow-up inspection was identified. Groundwater is sampled every two years, and was last sampled in June 2014. Results were not

  1. 241-AZ Farm Annulus Extent of Condition Baseline Inspection

    SciTech Connect (OSTI)

    Engeman, Jason K.; Girardot, Crystal L.; Vazquez, Brandon J.

    2013-05-15

    This report provides the results of the comprehensive annulus visual inspection for tanks 241- AZ-101 and 241-AZ-102 performed in fiscal year 2013. The inspection established a baseline covering about 95 percent of the annulus floor for comparison with future inspections. Any changes in the condition are also included in this document.

  2. 241-AY-102 Leak Detection Pit Drain Line Inspection Report

    SciTech Connect (OSTI)

    Boomer, Kayle D.; Engeman, Jason K.; Gunter, Jason R.; Joslyn, Cameron C.; Vazquez, Brandon J.; Venetz, Theodore J.; Garfield, John S.

    2014-01-20

    This document provides a description of the design components, operational approach, and results from the Tank AY-102 leak detection pit drain piping visual inspection. To perform this inspection a custom robotic crawler with a deployment device was designed, built, and operated by IHI Southwest Technologies, Inc. for WRPS to inspect the 6-inch leak detection pit drain line.

  3. Inspection Report: S05IS022 | Department of Energy

    Office of Environmental Management (EM)

    5IS022 Inspection Report: S05IS022 March 21, 2005 Review of Possible Inappropriate Job Solicitation Not Available for Viewing More Documents & Publications Inspection Report: S05IS042 Inspection Report: S99IS022 Inpsection Report: IG-0671

  4. Antibody specific for a DNA repair protein

    DOE Patents [OSTI]

    Petrini, John H.; Morgan, William Francis; Maser, Richard Scott; Carney, James Patrick

    2006-07-11

    An isolated and purified DNA molecule encoding a DNA repair protein, p95, is provided, as is isolated and purified p95. Also provided are methods of detecting p95 and DNA encoding p95. The invention further provides p95 knock-out mice.

  5. DNA encoding a DNA repair protein

    DOE Patents [OSTI]

    Petrini, John H.; Morgan, William Francis; Maser, Richard Scott; Carney, James Patrick

    2006-08-15

    An isolated and purified DNA molecule encoding a DNA repair protein, p95, is provided, as is isolated and purified p95. Also provided are methods of detecting p95 and DNA encoding p95. The invention further provides p95 knock-out mice.

  6. Selected Bibliography on Electric Motor Repair | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Selected Bibliography on Electric Motor Repair Selected Bibliography on Electric Motor Repair The following series of repair documents related to electric motors were produced by the U.S. Department of Energy's Advanced Manufacturing Office (formerly the Office of Industrial Technologies) with input from trade associations, consulting companies, manufacturers, non-profit operations, and others. PDF icon Selected Bibliography on Electric Motor Repair (November 1999) More Documents &

  7. Selected Bibliography on Electric Motor Repair | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Selected Bibliography on Electric Motor Repair Selected Bibliography on Electric Motor Repair The following series of repair documents related to electric motors were produced by the U.S. Department of Energy's Advanced Manufacturing Office (formerly the Office of Industrial Technologies) with input from trade associations, consulting companies, manufacturers, non-profit operations, and others. PDF icon Selected Bibliography on Electric Motor Repair (November 1999) More Documents &

  8. Component Repair Times Obtained from MSPI Data

    SciTech Connect (OSTI)

    Eide, Steven A.

    2015-05-01

    Information concerning times to repair or restore equipment to service given a failure is valuable to probabilistic risk assessments (PRAs). Examples of such uses in modern PRAs include estimation of the probability of failing to restore a failed component within a specified time period (typically tied to recovering a mitigating system before core damage occurs at nuclear power plants) and the determination of mission times for support system initiating event (SSIE) fault tree models. Information on equipment repair or restoration times applicable to PRA modeling is limited and dated for U.S. commercial nuclear power plants. However, the Mitigating Systems Performance Index (MSPI) program covering all U.S. commercial nuclear power plants provides up-to-date information on restoration times for a limited set of component types. This paper describes the MSPI program data available and analyzes the data to obtain median and mean component restoration times as well as non-restoration cumulative probability curves. The MSPI program provides guidance for monitoring both planned and unplanned outages of trains of selected mitigating systems deemed important to safety. For systems included within the MSPI program, plants monitor both train UA and component unreliability (UR) against baseline values. If the combined system UA and UR increases sufficiently above established baseline results (converted to an estimated change in core damage frequency or CDF), a “white” (or worse) indicator is generated for that system. That in turn results in increased oversight by the US Nuclear Regulatory Commission (NRC) and can impact a plant’s insurance rating. Therefore, there is pressure to return MSPI program components to service as soon as possible after a failure occurs. Three sets of unplanned outages might be used to determine the component repair durations desired in this article: all unplanned outages for the train type that includes the component of interest, only unplanned outages associated with failures of the component of interest, and only unplanned outages associated with PRA failures of the component of interest. The paper will describe how component repair times can be generated from each set and which approach is most applicable. Repair time information will be summarized for MSPI pumps and diesel generators using data over 2003 – 2007. Also, trend information over 2003 – 2012 will be presented to indicate whether the 2003 – 2007 repair time information is still considered applicable. For certain types of pumps, mean repair times are significantly higher than the typically assumed 24 h duration.

  9. REPORT OF ON-SITE INSPECTION WORKSHOP-16

    SciTech Connect (OSTI)

    Sweeney, J J

    2009-07-07

    The central issue addressed by this workshop was the task of making the on-site inspection (OSI) part of the Comprehensive Nuclear-Test-Ban Treaty verification system operationally ready at entry into force of the Treaty. It is recognized, and this was emphasized by the 2008 OSI Integrated Field Exercise (IFE), that it is not possible to develop every part of the OSI regime simultaneously. Therefore, it is necessary to prioritize the approach to OSI readiness. The reviews of the IFE have pointed to many elements of OSI readiness that still need development. The objective of this workshop was to provide priorities for the path forward for Working Group B to consider. Several critical areas have been identified that are related to the development of OSI readiness: (1) Technology development: Priorities are radionuclide and noble gas sampling and analysis, visual observation, multispectral/infrared imaging methods, active seismic methods and the recognition of the importance of signatures. (2) Organizational development: Priorities are health and safety, the Operations Support Centre, the Equipment Storage and Maintenance Facility, information technology data flow and communications. (3) Resources: The expertise to develop key parts of the OSI regime is not available within the current OSI Division staff. To develop these aspects of the regime will require more staff or supplements to the staff with cost-free experts or other means. Aspects of the system that could benefit from more staff include radionuclide and noble gas detection methods, data flow and communications, visual observation, multispectral/infrared methods and health and safety. As the path forward, participants of this workshop recognized a need to optimize the development of OSI priorities. The outcome of this workshop is to suggest for consideration an operational approach to OSI readiness that utilizes results of an evaluation of the relative effectiveness of OSI elements versus their relative maturity. By integrating such an assessment with considerations of integrated operational capabilities and the anticipated level of inspection team self-sufficiency and measurable milestone criteria, a set of priorities for OSI development can be developed. Once these priorities have been established, the Policy Making Organs can decide upon the milestones, strategic plan and action plan to serve as guidance for implementation by the Provisional Technical Secretariat. The suggested operational approach is as follows: (1) Assess the relative effectiveness (importance) of OSI elements versus their relative maturity; (2) Determine the anticipated level of self-sufficiency; (3) Define measurable milestone criteria; and (4) Result: Milestones for OSI readiness.

  10. Emergency pipe line repair connects subsea pipe lines

    SciTech Connect (OSTI)

    Lerique, M.P.; Thiberge, P. ); Wright, N. )

    1990-11-01

    Emergency repair of any subsea line pipe must form a high-integrity, metal-to-metal seal. This paper presents a remote, diverless repair system that utilizes master flanges, a connector and a spool piece to repair line pipe in deep offshore waters.

  11. Structural health and prognostics management for the enhancement of offshore wind turbine operations and maintenance strategies

    SciTech Connect (OSTI)

    Griffith, D. Todd; Yoder, Nathanael C.; Resor, Brian; White, Jonathan; Paquette, Joshua

    2013-09-19

    Offshore wind turbines are an attractive source for clean and renewable energy for reasons including their proximity to population centers and higher capacity factors. One obstacle to the more widespread installation of offshore wind turbines in the USA, however, is that recent projections of offshore operations and maintenance costs vary from two to five times the land-based costs. One way in which these costs could be reduced is through use of a structural health and prognostics management (SHPM) system as part of a condition-based maintenance paradigm with smart loads management. Our paper contributes to the development of such strategies by developing an initial roadmap for SHPM, with application to the blades. One of the key elements of the approach is a multiscale simulation approach developed to identify how the underlying physics of the system are affected by the presence of damage and how these changes manifest themselves in the operational response of a full turbine. A case study of a trailing edge disbond is analysed to demonstrate the multiscale sensitivity of damage approach and to show the potential life extension and increased energy capture that can be achieved using simple changes in the overall turbine control and loads management strategy. Finally, the integration of health monitoring information, economic considerations such as repair costs versus state of health, and a smart loads management methodology provides an initial roadmap for reducing operations and maintenance costs for offshore wind farms while increasing turbine availability and overall profit.

  12. Structural health and prognostics management for the enhancement of offshore wind turbine operations and maintenance strategies

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Griffith, D. Todd; Yoder, Nathanael C.; Resor, Brian; White, Jonathan; Paquette, Joshua

    2013-09-19

    Offshore wind turbines are an attractive source for clean and renewable energy for reasons including their proximity to population centers and higher capacity factors. One obstacle to the more widespread installation of offshore wind turbines in the USA, however, is that recent projections of offshore operations and maintenance costs vary from two to five times the land-based costs. One way in which these costs could be reduced is through use of a structural health and prognostics management (SHPM) system as part of a condition-based maintenance paradigm with smart loads management. Our paper contributes to the development of such strategies bymore » developing an initial roadmap for SHPM, with application to the blades. One of the key elements of the approach is a multiscale simulation approach developed to identify how the underlying physics of the system are affected by the presence of damage and how these changes manifest themselves in the operational response of a full turbine. A case study of a trailing edge disbond is analysed to demonstrate the multiscale sensitivity of damage approach and to show the potential life extension and increased energy capture that can be achieved using simple changes in the overall turbine control and loads management strategy. Finally, the integration of health monitoring information, economic considerations such as repair costs versus state of health, and a smart loads management methodology provides an initial roadmap for reducing operations and maintenance costs for offshore wind farms while increasing turbine availability and overall profit.« less

  13. FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting

    Office of Environmental Management (EM)

    Requirement | Department of Energy Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement PDF icon FY 2012 DARM Transmittal Letter and Attachment Final.pdf More Documents & Publications FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement Real Property Maintenance Reporting Requirement Memorandum (July 13, 2010)

  14. Acoustic Inspection Device V1.0

    Energy Science and Technology Software Center (OSTI)

    2002-01-16

    The Acoustic Inspection Device (AID) is an instrument used to interrogate materials with ultrasonic acoustic waves. The AID application software program runs under the Microsoft Windows 98 or Windows 2000 operating system. Is serves as the instrument controller and provides the user interface for the instrument known as the Acoustic Inspection Device (AID). The program requests, acquires, and analyzes acoustic waveforms from the AID hardware (pulser/receiver module, digitizer, and communications link). Graphical user displays ofmore » the AID application program include the real-time display of ultrasonic acoustic waveforms and analytical results including acoustic time-of-flight, velocity, and material identification. This program utilizes a novel algorithm, developed at PNNL, that automatically extracts the time-of-flight and amplitude data from the raw waveform and compares the extracted data to a material database.« less

  15. System for inspecting large size structural components

    DOE Patents [OSTI]

    Birks, Albert S. (Columbus, OH); Skorpik, James R. (Kennewick, WA)

    1990-01-01

    The present invention relates to a system for inspecting large scale structural components such as concrete walls or the like. The system includes a mobile gamma radiation source and a mobile gamma radiation detector. The source and detector are constructed and arranged for simultaneous movement along parallel paths in alignment with one another on opposite sides of a structural component being inspected. A control system provides signals which coordinate the movements of the source and detector and receives and records the radiation level data developed by the detector as a function of source and detector positions. The radiation level data is then analyzed to identify areas containing defects corresponding to unexpected variations in the radiation levels detected.

  16. APPLYING SIMPLE TECHNOLOGY ACCOMPLISHES VISUAL INSPECTION CHALLENGES

    SciTech Connect (OSTI)

    Robinson, C

    2007-07-21

    This paper discusses the successful implementation of simple video technologies at the Savannah River Site (SRS) to perform complex visual inspection, monitoring, and surveillance tasks. Because SRS facilities are similar to those of an industrial plant, the environmental and accessibility considerations for remote viewing are the primary determining factors in the selection of technology. The constraints and challenges associated with remote viewing are discussed, and examples of applications are given.

  17. Inspection Report: IG-0482 | Department of Energy

    Energy Savers [EERE]

    2 Inspection Report: IG-0482 September 28, 2000 Allegations Concerning the Department of Energy's Site Safeguards and Security Planning Process The Director, Office of Security and Emergency Operations provided the Office of Inspector General with a letter he had received which raised allegations of serious improprieties in the Department of Energy's Site Safeguards and Security Planning (SSSP) process. Specifically, the letter included allegations that a number of people within the Department

  18. Inspection Report: IG-0625 | Department of Energy

    Energy Savers [EERE]

    5 Inspection Report: IG-0625 November 4, 2003 Reporting of Security Incidents at the Lawrence Livermore National Laboratory Lawrence Livermore National Laboratory (Livermore) performs OBJECTIVES research and development activities in support of national defense that require the highest levels of security. The University of California (UC) manages and operates Livermore under contract with the Department of Energy (DOE), which includes the National Nuclear Security Administration (NNSA). On May

  19. Inspection Report: IG-0663 | Department of Energy

    Energy Savers [EERE]

    3 Inspection Report: IG-0663 Septermber 24, 2004 Control and Accountability of Emergency Communication Network Equipment The Department of Energy's Emergency Communication Network (ECN) is a high-speed, global, emergency communications network that supports the exchange of classified and unclassified voice, data, and video information for managing national emergencies, as well as emergencies involving the Department's facilities and operations. The ECN currently connects the Departments

  20. Inspection Report: IG-0703 | Department of Energy

    Energy Savers [EERE]

    3 Inspection Report: IG-0703 September 30, 2005 Characterization Wells at Los Alamos National Laboratory The Los Alamos National Laboratory (LANL), located on the Pajarito Plateau in Northern New Mexico, has been in operation since the early 1940's. LANL is a U.S. Department of Energy (DOE) research and development facility operated by the University of California. Throughout its history, LANL has conducted experimental research on the development of nuclear weapons and explosive materials that

  1. Inspection Report: IG-0745 | Department of Energy

    Energy Savers [EERE]

    5 Inspection Report: IG-0745 November 15, 2006 Material Control and Accountability at Lawrence Livermore National Laboratory Lawrence Livermore National Laboratory supports the Department of Energy's core mission of maintaining a safe, secure, and reliable nuclear weapons stockpile and applying scientific expertise toward the prevention of the proliferation of weapons of mass destruction and terrorist attacks. Livermore personnel perform tests and study various characteristics of nuclear

  2. Inspection Report: IG-0746 | Department of Energy

    Energy Savers [EERE]

    6 Inspection Report: IG-0746 November 29, 2006 Work Packages for Site Support Services at Los Alamos National Laboratory The Department of Energy's Los Alarnos National Laboratory (LANL) enhances global security by ensuring the safety and reliability of the U.S. nuclear weapons stockpile; developing technical solutioils to reduce the threat of weapons of mass destnlction; and solving problems related to energy, environment, infrastructure, health and national security. Site support services at

  3. Inspection Report: IG-0806 | Department of Energy

    Energy Savers [EERE]

    06 Inspection Report: IG-0806 November 25, 2008 40 MM Grenade Launcher Qualification Requirements at Department of Energy Sites The Department of Energy and its National Nuclear Security Administration (NNSA), operate some of the most sensitive Federal facilities in the United States. Because of the mission requirements, safeguards and security is a top priority at these sites. As part of its security regime, the Department maintains a cadre of armed protective force officers to prevent and

  4. Inspection Report: IG-0821 | Department of Energy

    Energy Savers [EERE]

    1 Inspection Report: IG-0821 September 11, 2009 Fire Suppression and Related Services at Los Alamos National Laboratory The Department of Energy's (DOE's) Los Alamos National Laboratory (LANL) is a multidisciplinary research institution engaged in strategic science on behalf of national security. LANL operates in "unique" hazard environments, to include special nuclear materials, explosives, and hazardous chemicals, that create special fire suppression and emergency management

  5. Inspection Report: IG-0850 | Department of Energy

    Energy Savers [EERE]

    50 Inspection Report: IG-0850 April 15, 2011 Verification of Lawrence Berkeley National Laboratory's Contract Workers' Eligibility to Work in the U.S. The Department of Energy's Lawrence Berkeley National Laboratory (Berkeley) is a research laboratory managed by the Department's Berkeley Site Office (Site Office). Berkeley, operated under contract by the University of California, conducts unclassified research across a wide range of scientific disciplines, employing approximately 4,200

  6. ETA-HIAC06 - Receipt Inspection

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 Revision 0 Effective: November 1, 2004 Receipt Inspection Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Garrett P. Beauregard Approved by: _________________________________________________ Date: ______________ Donald B. Karner ETA-HIAC06 Revision 1 2 2004 Electric Transportation Applications All Rights Reserved TABLE OF CONTENTS 1.0 Objectives 3 2.0 Purpose 3 3.0 Documentation 3 4.0 Initial Conditions and Prerequisites 4 5.0

  7. ETA-NAC006 - Receipt Inspection

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NAC006 Revision 2 Effective: December 1, 2004 Receipt Inspection Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Ryan Harkins Approved by: _________________________________________________ Date: ______________ Donald B. Karner ETA-NAC006 Revision 2 2 2004 Electric Transportation Applications All Rights Reserved TABLE OF CONTENTS 1.0 Objectives 3 2.0 Purpose 3 3.0 Documentation 3 4.0 Initial Conditions and Prerequisites 3 5.0

  8. ETA-UTP011 - Receipt Inspection

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    11 Revision 0 Effective March 23, 2001 Receipt Inspection Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Steven R. Ryan Approved by: _________________________________________________ Date: _______________ Jude M. Clark Procedure ETA-UTP011 Revision 0 Page 2 © 2001 Electric Transportation Applications All Rights Reserved TABLE OF CONTENTS 1.0 Objectives 3 2.0 Purpose 3 3.0 Documentation 3 4.0 Initial Conditions and Prerequisites 4

  9. Inspection Report: IG-0794 | Department of Energy

    Office of Environmental Management (EM)

    94 Inspection Report: IG-0794 May 22, 2008 Office of Science Laboratory Conferences The Department of Energy's Office of Science manages ten major laboratories, comprising one of the most comprehensive research systems of its kind in the world. Office of Science entities hold a variety of conferences that bring together a broad range of scientists and researchers to present scientific results, discuss technologies, and expand collaboration. Federal and Department policies provide guidance on the

  10. Inspection Report: IG-0852 | Department of Energy

    Office of Environmental Management (EM)

    2 Inspection Report: IG-0852 July 1, 2011 Alleged Violations of Executive Order 12333, U.S. Intelligence Activities - Improper Retention and Dissemination of Information on U.S. Persons The collection, retention and dissemination of intelligence data involving U.S. Persons is generally governed by Presidential Executive Order (E.O.) 12333, United States Intelligence Activities, July 2008, as amended. U.S. Persons include United States citizens, aliens known to be permanent resident aliens, or

  11. Inspection Report: IG-0859 | Department of Energy

    Office of Environmental Management (EM)

    9 Inspection Report: IG-0859 February 17, 2012 Property Accountability and Protection of Federal Sensitive Unclassified Information Under the Cooperative Agreement with the Incorporated County of Los Alamos On September 30, 2008, the National Nuclear Security Administration (NNSA) entered into a 5-year Cooperative Agreement with the County of Los Alamos. The Cooperative Agreement contained provisions for the management of Federally-owned personal property provided to the Los Alamos County Fire

  12. Inspection Report: IG-0464 | Department of Energy

    Office of Environmental Management (EM)

    4 Inspection Report: IG-0464 March 22, 2000 Follow-on Review of the Status of the U.S. Department of Energy's Counterintelligence Implementation Plan The National Defense Authorization Act for Fiscal Year 20001 requires the President to submit to Congress an annual report to include, as a minimum, an audit by the Inspectors General of the Departments of Commerce, Defense, Energy, and State of the policies and procedures of the United States (US) Government with respect to the export of

  13. Inspection Report: IG-0615 | Department of Energy

    Office of Environmental Management (EM)

    15 Inspection Report: IG-0615 August 11, 2003 Oversight of Shock Sensitive Chemicals at the Department's Ames Laboratory Shock sensitive chemicals, which are used throughout the Department of Energy (DOE) complex, have the potential to undergo a rapid reaction that can release relatively large amounts of energy that may be violent enough to produce an explosive detonation. Therefore, properly managing them is critical to ensuring the safety of personnel, as well as the protection of DOE assets.

  14. Inspection Report: IG-0636 | Department of Energy

    Office of Environmental Management (EM)

    36 Inspection Report: IG-0636 January 23, 2004 Protective Force Performance Test Improprieties On June 26, 2003, a protective force performance test was conducted at the Department of Energy's Y-12 National Security Complex, which is a component of the National Nuclear Security Administration (NNSA). The purpose of the test was to obtain realistic data for developing the Y-12 Site Safeguards and Security Plan. The mission at the site includes a number of sensitive activities, such as enriched

  15. Inspection Report: IG-0645 | Department of Energy

    Office of Environmental Management (EM)

    45 Inspection Report: IG-0645 April 13, 2004 Contractor Compliance with Deemed Export Controls The National Defense Authorization Act for Fiscal Year 2000 requires that between 2000 and 2007. the President shall submit to Congress and annual report to include a review that examines export control issues by the Offices of Inspector General (OIGs) of the Departments of Energy, Commerce, State, and Defense. For 2004, the OIGs for these agencies and the Department of Homeland Security and the

  16. Inspection Report: IG-0654 | Department of Energy

    Office of Environmental Management (EM)

    4 Inspection Report: IG-0654 July 6, 2004 Unauthorized Handguns on National Nuclear Security Administration Aircraft The Office of Inspector General (OIG) received several allegations related to the transport of handguns by National Nuclear Security Administration (NNSA) affiliated personnel between Albuquerque, New Mexico, and Las Vegas, Nevada, where a training exercise involving NNSA's Office of Secure Transportation (OST) was to be held. One of the allegations was that on October 14, 2003,

  17. Inspection Report: IG-0674 | Department of Energy

    Office of Environmental Management (EM)

    74 Inspection Report: IG-0674 February 11, 2005 Unauthorized Handguns on the Nevada Test Site Within the Department of Energy (DOE), the National Nuclear OBJECTIVES Security Administration's (NNSA's) Office of Secure Transportation (OST) is responsible for providing the safe and secure transport of nuclear weapons, special nuclear materials, and weapons components between DOE production facilities and Department of Defense facilities via surface and air modes of transportation. OST uses the

  18. Inspection Report: IG-0681 | Department of Energy

    Office of Environmental Management (EM)

    1 Inspection Report: IG-0681 March 24, 2005 Concerns Regarding a Non-Viable (Dead)"Anthrax Spore" Research Project at theOak Ridge National Laboratory The Office of Inspector General (OIG) received an anonymous complaint involving an "anthrax" (Bacillus anthracis, Ames strain) spore research project at the Department of Energy's (DOE) Oak Ridge National Laboratory (ORNL). Specifically, it was alleged that: * A former ORNL employee who returned to ORNL as a Guest Researcher

  19. Inspection Report: IG-0682 | Department of Energy

    Office of Environmental Management (EM)

    2 Inspection Report: IG-0682 March 24, 2005 The Department of Energy's Review of Chemical and Biological Export License Applications The National Defense Authorization Act (NDAA) for Fiscal Year (FY) 2000 provides that beginning in the year 2000 and ending in the year 2007, the President shall annually submit to Congress a report by the Inspectors General of, at a minimum, the Departments of Energy (Energy), Commerce (Commerce), Defense (Defense), and State (State) of the policies and procedures

  20. Inspection Report: IG-0687 | Department of Energy

    Office of Environmental Management (EM)

    7 Inspection Report: IG-0687 April 28, 2005 Property Control and Accountability at the Idaho National Laboratory The Department of Energy's (DOE's) Idaho National Laboratory (INL) couples scientific and engineering expertise with unique facilities and operations to execute DOE missions. These missions include addressing the environmental legacy of the Cold War; ensuring a secure, reliable, and sustainable national energy infrastructure; supporting national security programs; and contributing to

  1. Inspection Report: IG-0715 | Department of Energy

    Office of Environmental Management (EM)

    5 Inspection Report: IG-0715 January 12, 2006 Acquisition of Protective Force Weapons by Sandia National Laboratory, New Mexico Sandia National Laboratory, New Mexico (Sandia Laboratory), is a Department of Energy (DOE) research and development facility operated by Sandia Corporation. Located on Kirtland Air Force Base in Albuquerque, New Mexico, Sandia Laboratory applies advanced science and engineering to help the U.S. and its allies detect, repel, defeat, or mitigate national security

  2. Inspection Report: IG-0716 | Department of Energy

    Office of Environmental Management (EM)

    6 Inspection Report: IG-0716 January 19, 2006 Security Clearance Terminations and Badge Retrieval at the Lawrence Livermore National Laboratory The Lawrence Livermore National Laboratory (Livermore) is a National Nuclear Security Administration (NNSA) site supporting the Department of Energy's (DOE's) core mission of maintaining a safe, secure, and reliable nuclear weapon stockpile and applying scientific expertise toward the prevention of the proliferation of weapons of mass destruction and

  3. Inspection Report: IG-0717 | Department of Energy

    Office of Environmental Management (EM)

    7 Inspection Report: IG-0717 January 24, 2006 Electronic Recording of Telephone and Radio Conversations by Los Alamos National Laboratory Protective Force Management The Department of Energy's (DOE's) Los Alamos National AND OBJECTIVES Laboratory (LANL) is one of the largest multidisciplinary science institutions in the world. The primary national security missions of LANL are to help ensure the safety and reliability of the Nation's nuclear stockpile, prevent the spread of weapons of mass

  4. Inspection Report: IG-0719 | Department of Energy

    Office of Environmental Management (EM)

    9 Inspection Report: IG-0719 February 2, 2006 Protective Force Contracts at the Oak Ridge Reservation The Department of Energy (DOE) mission at the Oak Ridge AND OBJECTIVE Reservation requires a paramilitary protective force comprised of several hundred security police officers to safeguard the production and storage of nuclear weapons components, special nuclear material, and other sensitive work. Wackenhut Services, Inc. (Wackenhut) initially provided protective force services for the Oak

  5. Inspection Report: IG-0732 | Department of Energy

    Office of Environmental Management (EM)

    2 Inspection Report: IG-0732 June 30, 2006 The Human Reliability Program at Lawrence Livermore National Laboratory The Department of Energy's (DOE's) Lawrence Livermore National Laboratory (LLNL) supports the core mission of maintaining a safe, secure, and reliable nuclear weapons stockpile and applies scientific expertise towards the prevention of the proliferation of weapons of mass destruction and terrorist attacks. LLNL is managed by the University of California for the Department's National

  6. Inspection Report: IG-0734 | Department of Energy

    Office of Environmental Management (EM)

    4 Inspection Report: IG-0734 July 26, 2006 Internal Controls for Excessing and Surplusing Unclassified Computers atLos Alamos National Laboratory The Department of Energy's (DOE's) Los Alamos National AND OBJECTIVE Laboratory (LANL) is one of the largest multidisciplinary science institutions in the world. The primary national security missions of LANL are to help ensure the safety and reliability of the Nation's nuclear stockpile, prevent the spread of weapons of mass destruction, develop

  7. Inspection Report: IG-0754 | Department of Energy

    Office of Environmental Management (EM)

    4 Inspection Report: IG-0754 January 18, 2007 Sandia National Laboratory-California Procurement Card Program The mission of the Department of Energy's (DOE's) Sandia AND OBJECTIVE National Laboratory-California (Sandia-CA) includes applying advanced science and engineering to support the United States' deterrence policy by ensuring the nuclear weapons stockpile is safe, reducing the proliferation of weapons of mass destruction, and enhancing the surety of energy. Sandia-CA is managed by Lockheed

  8. Inspection Report: IG-0757 | Department of Energy

    Office of Environmental Management (EM)

    7 Inspection Report: IG-0757 February 16, 2007 Excessing of Computers Used for Unclassified Controlled Information at the Idaho National Laboratory In support of its mission, the Department of Energy spends over $2 billion each year on information technology and has a current inventory of approximately 800 information systems, including up to 115,000 personal computers, many powerful supercomputers, numerous servers, and a broad array of related peripheral equipment. The unclassified computers

  9. Inspection Report: IG-0770 | Department of Energy

    Office of Environmental Management (EM)

    0 Inspection Report: IG-0770 July 20, 2007 Protective Force MK-19 Grenade Launcher Use at the National Nuclear Security Administration's Pantex Facility The National Nuclear Security Administration's (NNSA) Pantex Facility is this Nation's only nuclear weapons assembly and disassembly facility. The nature of such work necessitates the development and implementation of protection strategies based upon the Department of Energy's (Department) Design Basis Threat process. Facilities such as Pantex

  10. Inspection Report: IG-0774 | Department of Energy

    Office of Environmental Management (EM)

    4 Inspection Report: IG-0774 September 7, 2007 Material Control and Accountability at Los Alamos National Laboratory The Department of Energy's Los Alamos National Laboratory (LANL) has a national security mission that includes responsibility for the science, engineering and technology related to certain radioactive materials supporting the Nation's nuclear weapons program. These include materials such as plutonium, enriched uranium and depleted uranium. LANL maintains inventories of Categories

  11. OFFICE OF INSPECTION AND ENFORCEMENJ Regfon I

    Office of Legacy Management (LM)

    ,. ' e' , U .S :UCtEAR REGULATORY COMMISSION;1 OFFICE OF INSPECTION AND ENFORCEMENJ Regfon I Report No. 078-154-A - Part 2 of 2 Subject: Radioactive Material in Uncontrolled Location, Norton, Massachusetts Investigation at: Norton and Attleboro, Massachusetts . Investigation conducted: November 14, 19.78 - April 1, 1979 Investigator: Walter G. Martin, Chief, Safeguards Branch Approved by: James M. Allan, Deputy Director, Region I G/7/7? /date signed date signed Investigation Sunrmary:

  12. SURVEILLANCE AND MAINTENANCE RBSM The Requirements Based Surveillance

    Office of Environmental Management (EM)

    SURVEILLANCE AND MAINTENANCE RBSM The Requirements Based Surveillance and Maintenance Review Process Surveillance and Maintenance Overview What is RBSM and why do I need this process? Who has used this process so far? A Summary of RBSM results across the DOE complex Viewing a sample RBSM report Performing RBSM at your facility RBSM Guidance package Surveillance and Maintenance Overview Overall direction for surveillance and maintenance of excess facilities is addressed in DOE G 430.1-2,

  13. Site Transition Framework for Long-Term Surveillance and Maintenance |

    Energy Savers [EERE]

    Department of Energy Framework for Long-Term Surveillance and Maintenance Site Transition Framework for Long-Term Surveillance and Maintenance Site Transition Framework for Long-Term Surveillance and Maintenance PDF icon Site Transition Framework for Long-Term Surveillance and Maintenance More Documents & Publications Site Transition Framework for Long-Term Surveillance and Maintenance Site Transition Process Upon Cleanup Completion Long-Term Stewardship Study

  14. ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 1: SPACE AND MAINTENANCE RECORDS ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS This schedule provides for the disposal of all copies, wherever located in the Department of records relating to space and maintenance, except as indicated below. PDF icon ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS ADMINISTRATIVE RECORDS SCHEDULE 12:

  15. Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    CNG Fuel System and Cylinder Maintenance to someone by E-mail Share Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Facebook Tweet about Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Twitter Bookmark Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Google Bookmark Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Delicious Rank Alternative Fuels Data Center: CNG Fuel System and Cylinder

  16. Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Facility Ryder Opens Natural Gas Vehicle Maintenance Facility to someone by E-mail Share Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Facebook Tweet about Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Twitter Bookmark Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Google Bookmark Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on

  17. POST-DEACTIVATION SURVEILLANCE AND MAINTENANCE PLANNING

    Office of Environmental Management (EM)

    POST-DEACTIVATION SURVEILLANCE AND MAINTENANCE PLANNING Post-Deactivation Surveillance and Maintenance Planning Dependence of End-Points Planning on S&M Planning Primary Surveillance Concerns Typical Deactivation S&M Plan Contents Example of a Post-Deactivation S&M Plan Dependence of End-Points Planning on S&M Planning One of the key elements of end-point planning is knowing what the post-deactivation S&M activities will be so that conditions can be established to support

  18. Accelerated learning approaches for maintenance training

    SciTech Connect (OSTI)

    Erickson, E.J.

    1991-01-01

    As a training tool, Accelerated Learning techniques have been in use since 1956. Trainers from a variety of applications and disciplines have found success in using Accelerated Learning approaches, such as training aids, positive affirmations, memory aids, room arrangement, color patterns, and music. Some have thought that maintenance training and Accelerated Learning have nothing in common. Recent training applications by industry and education of Accelerated Learning are proving very successful by several standards. This paper cites available resource examples and challenges maintenance trainers to adopt new ideas and concepts to accelerate learning in all training setting. 7 refs.

  19. Post-Closure Inspection Report for Corrective Action Unit 424: Area 3 Landfill Complex, Tonopah Test Range, Nevada, Calendar Year 2000

    SciTech Connect (OSTI)

    K. B. Campbell

    2001-06-01

    Corrective Action Unit (CAU) 424, the Area 3 Landfill Complex at Tonopah Test Range, consists of eight landfill sites, Corrective Action Sites (CASS), seven of which are landfill cells that were closed previously by capping. (The eighth CAS, A3-7, was not used as a landfill site and was closed without taking any corrective action.) Figure 1 shows the locations of the landfill cells. CAU 424 closure activities included removing small volumes of soil containing petroleum hydrocarbons, repairing cell covers that were cracked or had subsided, and installing above-grade and at-grade monuments marking the comers of the landfill cells. Post-closure monitoring requirements for CAU 424 are detailed in Section 5.0, Post-Closure Inspection Plan contained, in the Closure Report for Corrective Action Unit 424: Area 3 Landfill Complex, Tonopah Test Range. Nevada, report number DOE/NV--283. The Closure Report (CR) was approved by the Nevada Division of Environmental Protection (NDEP) in July 1999. The CR includes compaction and permeability results of soils that cap the seven landfill cells. Post-closure monitoring consists of the following: (1) Site inspections done twice a year to evaluate the condition of the unit; (2) Verification that the site is secure; (3) Notice of any subsidence or deficiencies that may compromise the integrity of the unit; (4) Remedy of any deficiencies within 90 days of discovery; and (5) Preparation and submittal of an annual report. Site inspections were conducted on June 20, 2000, and November 20, 2000. The inspections were preformed after the NDEP approval of the CR. This report includes copies of the inspection checklist and photographs, and recommendations and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and copies of the inspection photographs are found in Attachment C.

  20. Helium bubble distributions in reactor tank repair specimens. Part 1

    SciTech Connect (OSTI)

    Tosten, M.H.; Kestin, P.A.

    1992-03-01

    This report discusses the Reactor Tank Repair (RTR) program was initiated to develop an in-tank repair process capable of repairing stress corrosion cracks within the SRS reactor tank walls, in the event that such a repair is needed. Previous attempts to repair C-reactor tank with a gas tungsten arc (GTA) welding process were unsuccessful due to significant cracking that occurred in the heat-affected-zones adjacent to the repair welds. It was determined that this additional cracking was a result of helium embrittlement caused by the combined effects of helium (existing within the tank walls), the high heat input associated with the GTA process, and weld shrinkage stresses. Based on the results of earlier studies it was suggested that the effects of helium embrittlement could be minimized by using a low heat input GMA process. Metallographic analysis played an important role throughout the investigation of alternative welding methods for the repair of helium-containing materials.

  1. Helium bubble distributions in reactor tank repair specimens

    SciTech Connect (OSTI)

    Tosten, M.H.; Kestin, P.A.

    1992-03-01

    This report discusses the Reactor Tank Repair (RTR) program was initiated to develop an in-tank repair process capable of repairing stress corrosion cracks within the SRS reactor tank walls, in the event that such a repair is needed. Previous attempts to repair C-reactor tank with a gas tungsten arc (GTA) welding process were unsuccessful due to significant cracking that occurred in the heat-affected-zones adjacent to the repair welds. It was determined that this additional cracking was a result of helium embrittlement caused by the combined effects of helium (existing within the tank walls), the high heat input associated with the GTA process, and weld shrinkage stresses. Based on the results of earlier studies it was suggested that the effects of helium embrittlement could be minimized by using a low heat input GMA process. Metallographic analysis played an important role throughout the investigation of alternative welding methods for the repair of helium-containing materials.

  2. ICD Complex Operations and Maintenance Plan

    SciTech Connect (OSTI)

    Gibson, P. L.

    2007-06-25

    This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

  3. Davis PV plant operation and maintenance manual

    SciTech Connect (OSTI)

    1994-09-01

    This operation and maintenance manual contains the information necessary to run the Photovoltaics for Utility Scale Applications (PVUSA) test facility in Davis, California. References to more specific information available in drawings, data sheets, files, or vendor manuals are included. The PVUSA is a national cooperative research and demonstration program formed in 1987 to assess the potential of utility scale photovoltaic systems.

  4. Post-Closure Inspection and Monitoring Report for Corrective Action Unit 417: Central Nevada Test Area Surface, Hot Creek Valley, Nevada, for Calendar Year 2007

    SciTech Connect (OSTI)

    2008-09-01

    This report presents data collected during the annual post-closure site inspection conducted at the Central Nevada Test Area Surface Corrective Action Unit (CAU) 417 in May 2007. The annual post-closure site inspection included inspections of the UC-1, UC-3, and UC-4 sites in accordance with the Post-Closure Monitoring Plan provided in the CAU 417 Closure Report (NNSA/NV 2001). The annual inspection conducted at the UC-1 Central Mud Pit (CMP) indicated the site and soil cover were in good condition. No new cracks or fractures were observed in the soil cover during the annual inspection. A crack on the west portion of the cover was observed during the last quarterly inspection in December 2006. This crack was filled with bentonite as part of the maintenance activities conducted in February 2007 and will be monitored during subsequent annual inspections. The vegetation on the soil cover was adequate but showing signs of the area's ongoing drought. No issues were identified with the CMP fence, gate, or subsidence monuments. New DOE Office of Legacy Management signs with updated emergency phone numbers were installed as part of this annual inspection, no issues were identified with the warning signs and monuments at the other two UC-1 locations. The annual subsidence survey was conducted at UC-1 CMP and UC-4 Mud Pit C as part of the maintenance activities conducted in February 2007. The results of the subsidence surveys indicate that the covers are performing as expected, and no unusual subsidence was observed. A vegetation survey of the UC-1 CMP cover and adjacent areas was conducted as part of the annual inspection in May 2007. The vegetation survey indicated that revegetation continues to be successful, although stressed due to the area's prevailing drought conditions. The vegetation should continue to be monitored to document any changes in the plant community and to identify conditions that could potentially require remedial action to maintain a viable vegetation cover on the site. It is suggested that future vegetation surveys be conducted once every 2 years or as needed to help monitor the health of the vegetation.

  5. Inspection of Fusion Joints in Plastic Pipe

    SciTech Connect (OSTI)

    Connie Reichert

    2005-09-01

    The standard method of joining plastic pipe in the field is the butt fusion process. As in any pipeline application, joint quality greatly affects overall operational safety of the system. Currently no simple, reliable, cost-effective method exists for assessing the quality of fusion joints in the field. Visual examination and pressure testing are current nondestructive approaches, which do not provide any assurance about the long-term pipeline performance. This project developed, demonstrated, and validated an in-situ nondestructive inspection method for butt fusion joints in gas distribution plastic pipelines. The inspection system includes a laser-based image-recognition system that automatically generates and interprets digital images of pipe joints and assigns them a pass/fail rating, which eliminates operator bias in evaluating joint quality. An EWI-patented process, the Weld Zone Inspection Method (WZIM) was developed in which local heat is applied to the joint region to relax the residual stresses formed by the original joining operation, which reveals the surface condition of the joint. In cases where the joint is not formed under optimal conditions, and the intermolecular forces between contacting surfaces are not strong enough, the relaxation of macromolecules in the surface layer causes the material to pull back, revealing a fusion line. If the joint is sound, the bond line image does not develop. To establish initial feasibility of the approach, welds were performed under standard and nonstandard conditions. These welds were subjected to the WZIM and two destructive forms of testing: short-term tensile testing and long-term creep rupture testing. There appears to be a direct correlation between the WZIM and the destructive testing results. Although WZIM appears to be more sensitive than destructive testing can verify, the approach appears valid.

  6. Advanced spent fuel conditioning process (ACP) progress with respect to remote operation and maintenance

    SciTech Connect (OSTI)

    Lee, Hyo Jik; Lee, Jong Kwang; Park, Byung Suk; Yoon, Ji Sup

    2007-07-01

    Korea Atomic Energy Research Institute (KAERI) has been developing an Advanced Spent Fuel Conditioning Process (ACP) to reduce the volume of spent fuel, and the construction of the ACP facility (ACPF) for a demonstration of its technical feasibility has been completed. In 2006 two inactive demonstrations were performed with simulated fuels in the ACPF. Accompanied by process equipment performance tests, its remote operability and maintainability were also tested during that time. Procedures for remote operation tasks are well addressed in this study and evaluated thoroughly. Also, remote maintenance and repair tasks are addressed regarding some important modules with a high priority order. The above remote handling test's results provided a lot of information such as items to be revised to improve the efficiency of the remote handling tasks. This paper deals with the current status of ACP and the progress of remote handling of ACPF. (authors)

  7. Acoustic microscope surface inspection system and method

    DOE Patents [OSTI]

    Khuri-Yakub, B.T.; Parent, P.; Reinholdtsen, P.A.

    1991-02-26

    An acoustic microscope surface inspection system and method are described in which pulses of high frequency electrical energy are applied to a transducer which forms and focuses acoustic energy onto a selected location on the surface of an object and receives energy from the location and generates electrical pulses. The phase of the high frequency electrical signal pulses are stepped with respect to the phase of a reference signal at said location. An output signal is generated which is indicative of the surface of said selected location. The object is scanned to provide output signals representative of the surface at a plurality of surface locations. 7 figures.

  8. Guidelines for Engineering, Design, and Inspection Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Engineering, design, and inspection (ED&I) activities begin with the preliminary design (Title I). Pre-Title I activities are not considered part of the ED&I activities. Architectural/Engineering (A/E) activities are part of the ED&I activities. A/E activities are services that are an integral part of the production and delivery of the design plans, specifications, and drawings. This chapter defines ED&I and A/E activities and discusses how to estimate and track them.

  9. Acoustic microscope surface inspection system and method

    DOE Patents [OSTI]

    Khuri-Yakub, Butrus T. (Palo Alto, CA); Parent, Philippe (Chilly-Mazarin, FR); Reinholdtsen, Paul A. (Seattle, WA)

    1991-01-01

    An acoustic microscope surface inspection system and method in which pulses of high frequency electrical energy are applied to a transducer which forms and focuses acoustic energy onto a selected location on the surface of an object and receives energy from the location and generates electrical pulses. The phase of the high frequency electrical signal pulses are stepped with respected to the phase of a reference signal at said location. An output signal is generated which is indicative of the surface of said selected location. The object is scanned to provide output signals representative of the surface at a plurality of surface locations.

  10. Include tech service engineers in turnaround inspections

    SciTech Connect (OSTI)

    Miller, J.E.

    1987-05-01

    Process Unit startup problems can be minimized by having technical service or process engineers perform equipment turnaround inspections. Most plants have inspectors who are specifically trained to identify corrosion, fatigue and other conditions that lead to deterioration of equipment mechanical integrity. Inspectors are also concerned with the proper assembly of equipment to ensure that all construction agrees with the field drawings. Training and knowledge of how process equipment actually operates often varies among individual inspectors. This, unfortunately, can lead to process equipment performance problems after startup with equipment that is reportedly in good mechanical condition.

  11. Coordinate Measuring Machine Pit Artifact Inspection Procedure

    SciTech Connect (OSTI)

    Montano, Joshua D.

    2012-07-31

    The goal of this document is to outline a procedure for dimensional measurement of Los Alamos National Laboratory's CMM Pit Artifact. This procedure will be used by the Manufacturing Practice's Inspection Technology Subgroup of the Interagency Manufacturing Operations Group and Joint Operations Weapon Operations Group (IMOG/JOWOG 39) round robin participants. The intent is to assess the state of industry within the Nuclear Weapons Complex for measurements made on this type of part and find which current measurement strategies and techniques produce the best results.

  12. Intelligent Mobile Sensor System for drum inspection and monitoring -- Volume 1. Final report, October 1, 1993--April 22, 1995

    SciTech Connect (OSTI)

    1995-12-31

    The objective of the Intelligent Mobile Sensor System (IMSS) project is to develop an operational system for monitoring and inspection activities for waste storage facility operations at several DOE sites. Specifically, the product of this effort is a robotic device with enhanced intelligence and maneuverability capable of conducting routine inspection of stored waste drums. The device is capable of operating in the narrow free aisle space between rows of stacked drums. The system has an integrated sensor suite for problem-drum detection, and is linked to a site database both for inspection planning and for data correlation, updating, and report generation. The system is capable of departing on an assigned mission, collecting required data, recording which portions of its mission had to be aborted or modified due to environmental constraints, and reporting back when the mission is complete. Successful identification of more than 96% of drum defects has been demonstrated in a high fidelity waste storage facility mockup. Identified anomalies included rust spots, rust streaks, areas of corrosion, dents, and tilted drums. All drums were positively identified and correlated with the site database. This development effort is separated into three phases of which phase two is now complete. The first phase demonstrated an integrated system (maturity level IVa) for monitoring and inspection activities for waste storage facility operations. The second phase demonstrated a prototype system appropriate for operational use in an actual storage facility. The prototype provides an integrated design that considers operational requirements, hardware costs, maintenance, safety, and robustness. The final phase will demonstrate commercial viability using the prototype vehicle in a pilot waste operations and inspection project. This report summarizes the design and evaluation of the new IMSS Phase 2 system and vehicle.

  13. Intelligent mobile sensor system for drum inspection and monitoring: Phase 1. Topical report, October 1, 1992--June 8, 1993

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    The objective of this project was to develop an operational system for monitoring and inspection activities for waste storage facility operations at several DOE sites. Specifically, the product of this effort is a robotic device with enhanced intelligence and maneuverability capable of conducting routine inspection of stored waste drums. The device is capable of operating in narrow aisles and interpolating the free aisle space between rows of stacked drums. The system has an integrated sensor suite for leak detection, and is interfaced with a site database both for inspection planning and for data correlation, updating, and report generation. The system is capable of departing on an assigned mission, collecting required data, recording which positions of its mission had to be aborted or modified due to environmental constraints, and reporting back when the mission is complete. Successful identification of more than 90% of all drum defects has been demonstrated in a high fidelity waste storage facility mockup. Identified anomalies included rust spots, rust streaks, areas of corrosion, dents, and tilted drums. All drums were positively identified and correlated with the site database. This development effort is separated into three phases of which phase one is now complete. The first phase has demonstrated an integrated system for monitoring and inspection activities for waste storage facility operations. This demonstration system was quickly fielded and evaluated by leveraging technologies developed from previous NASA and DARPA contracts and internal research. The second phase will demonstrate a prototype system appropriate for operational use in an actual storage facility. The prototype provides an integrated design that considers operational requirements, hardware costs, maintenance, safety, and robustness. The final phase will demonstrate commercial viability using the prototype vehicle in a pilot waste operations and inspection project.

  14. CRAD, Safety Systems Inspection Criteria - December 17, 2012...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and installation, configuration management, surveillance testing, maintenance, operations, cognizant system engineer (CSE) and safety system oversight (SSO), and feedback and...

  15. North American Standard Level VI Inspection Program Update: Ensuring Safe

    Office of Environmental Management (EM)

    Transportation of Radioactive Material | Department of Energy North American Standard Level VI Inspection Program Update: Ensuring Safe Transportation of Radioactive Material North American Standard Level VI Inspection Program Update: Ensuring Safe Transportation of Radioactive Material Presentation made by Carlisle Smith for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY PDF icon North American Standard Level VI Inspection Program Update: Ensuring Safe Transportation of

  16. Independent Oversight Inspection, Sandia National Laboratories - July 2006

    Broader source: Energy.gov (indexed) [DOE]

    | Department of Energy July 2006 Emergency Management Inspection of the Sandia National Laboratories This report provides the results of an independent oversight inspection of the emergency management program at the Department of Energy's (DOE) Sandia National Laboratories. The inspection was performed in May 2006 by the Office of Independent Oversight's Office of Emergency Management Oversight, within the DOE Office of Security and Safety Performance Assurance. PDF icon Independent

  17. ORISE Contract, PART I - SCHEDULE, Section E Inspection and Acceptance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    E INSPECTION AND ACCEPTANCE E.1 52.246-5 INSPECTION OF SERVICES - COST-REIMBURSEMENT (APR 1984) ......................................................................................................................... 3 E.2 ACCEPTANCE (MAY 1997) .......................................................................................... 4 Section E - Page 1 of 4 DE-AC05-06OR23100 Blank Page Section E - Page 2 of 4 DE-AC05-06OR23100 PART I - SCHEDULE SECTION E INSPECTION AND ACCEPTANCE E.1 52.246-5

  18. TEC Working Group Topic Groups Rail Conference Call Summaries Inspections

    Office of Environmental Management (EM)

    Subgroup | Department of Energy Summaries Inspections Subgroup TEC Working Group Topic Groups Rail Conference Call Summaries Inspections Subgroup Inspections Subgroup PDF icon April 6, 2006 PDF icon February 23, 2006 Draft PDF icon January 24, 2006 More Documents & Publications TEC Working Group Topic Groups Rail Conference Call Summaries Planning Subgroup TEC Working Group Topic Groups Rail Conference Call Summaries Tracking Subgroup TEC Working Group Topic Groups Rail Conference Call

  19. Independent Oversight Inspection, Los Alamos National Laboratory - January

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2007 | Department of Energy Los Alamos National Laboratory - January 2007 Independent Oversight Inspection, Los Alamos National Laboratory - January 2007 January 2007 Independent Oversight Inspection of Emergency Management at the Los Alamos site office and Los Alamos National Laboratory The U.S. Department of Energy (DOE) Office of Independent Oversight inspected the emergency management program at DOE's Los Alamos Site Office (LASO) and Los Alamos National Laboratory (LANL) in

  20. How Healthcare + Industry Breeds Better Inspection Technology | GE Global

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research How Healthcare + Industry Breeds Better Inspection Technology Click to email this to a friend (Opens in new window) Share on Facebook (Opens in new window) Click to share (Opens in new window) Click to share on LinkedIn (Opens in new window) Click to share on Tumblr (Opens in new window) How Healthcare + Industry Breeds Better Inspection Technology Healthcare and industrial inspection technologies seem worlds apart; but overlapping areas of expertise like those are among the things