Powered by Deep Web Technologies
Note: This page contains sample records for the topic "inputs mining equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Abandoned Uranium Mines Report to Congress: LM Wants Your Input |  

Broader source: Energy.gov (indexed) [DOE]

Abandoned Uranium Mines Report to Congress: LM Wants Your Input Abandoned Uranium Mines Report to Congress: LM Wants Your Input Abandoned Uranium Mines Report to Congress: LM Wants Your Input April 11, 2013 - 1:33pm Addthis C-SR-10 Uintah Mine, Colorado, LM Uranium Lease Tracts C-SR-10 Uintah Mine, Colorado, LM Uranium Lease Tracts What does this project do? Goal 4. Optimize the use of land and assets Abandoned Uranium Mines Report to Congress The U.S. Department of Energy (DOE) Office of Legacy Management (LM) is seeking stakeholder input on an abandoned uranium mines report to Congress. On January 2, 2013, President Obama signed into law the National Defense Authorization Act for Fiscal Year 2013, which requires the Secretary of Energy, in consultation with the Secretary of the U.S Department of the Interior (DOI) and the Administrator

2

Reduction of fire hazards on large mining equipment  

SciTech Connect (OSTI)

Although standards and regulations are in place to prevent large mining equipment fires, recent analyses of mine accident data show that mining equipment fires still occur with alarming frequency and grave consequences, particularly at all surface mines and in underground metal/nonmetal mines. Recently technological advances in fire protection, combined with the statistical data on equipment fires, led NIOSH to reinvestigate this and to improve operator safety. NIOSH demonstrated that newly developed technologies, such as dual cab fire inerting systems and engine compartment fire barriers, can greatly enhance operator safety and lessen the damage of property during large mobile equipment fires. 10 refs., 5 figs.

Maria I. De Rosa

2008-09-15T23:59:59.000Z

3

Large mobile mining equipment operating on soft ground T.G. Joseph  

E-Print Network [OSTI]

1 Large mobile mining equipment operating on soft ground T.G. Joseph School of Mining & Petroleum. The toll on large mobile mining equipment such as > 327 tonne capacity haulers and > 46 m3 electric for large mobile units, a discussion on the extension of the process to shovel undercarriage and carbody

Joseph, Tim Grain

4

Reclamation cost inputs for the resource allocation and mine costing model. Final working paper  

SciTech Connect (OSTI)

The purpose of this study is to improve estimates of surface mining reclamation cost components used as inputs to the Energy Information Administration's Resource Allocation and Mine Costing (RAMC) model. Costs ignored by the RAMC equations and input separately into the model on a regional basis were the focus of this study. Estimates of costs associated with the following reclamation activities were developed: valley fill construction, topsoil handling, runoff and diversion ditch construction and backfilling, sediment pond construction and backfilling, final pit backfilling and highwall reduction, revegetation, and permitting. For each activity, separate estimates were developed by cost component (initial capital, deferred capital, and annual operating), region (central Appalachia, northern Appalachia, the Midwest, and the West), and overburden ratio. For the first five activities, a ''composite mine'' approach was used. Basic engineering data on the quantity of material moved, and the distance over which it is moved, were obtained on a task-by-task basis for regional samples of actual mining operations. Mine permit applications filed with state and federal regulatory agencies were used as the source of these data. On the basis of the collected data, average material quantities and transportation distances were calculated for each region and reclamation task; these averages were used as the composite mine specifications assumed to be representative of the typical earthmoving requirements associated with each task in each region. Revegetation costs were estimated on the basis of published or publicly available data representing either the actual or estimated costs to state governments of revegetating abandoned mine sites. Permitting costs were developed on the basis of estimates of typical regional permitting costs solicited from engineering contractors providing permitting services to the coal industry. 11 tabs.

Not Available

1984-11-30T23:59:59.000Z

5

Destruction of a wetland ecosystem by inputs of circumneutral, treated coal mine drainage  

SciTech Connect (OSTI)

Wymer Run Bog is a representative example of the naturally acidic Sphagnum-dominated wetlands that are scattered throughout the Appalachian coal mining region of West Virginia. This bog is situated downslope from a sediment pond associated with a coal surface mine. Sodium carbonate briquettes are used in the pond to raise the pH of the mine drainage water to between 6 and 9. For the past 3 years, a leak in the bank of the pond has served as a source of circumneutral, treated mine drainage water flowing into Wymer Run Bog. Initial observations showed that the area of the wetland receiving the treated mine drainage water was characterized by widespread death of the wetland vegetation, especially the Sphagnum and Polytrichum mosses, and that the peat had been eroded down to mineral soil. Laboratory studies indicated that Sphagnum recurvum grew well at pH 4, but at pH 8 the plants died in about 20 days. Observations from other wetlands indicated that S. recurvum can survive where untreated acid mine drainage enters a wetland, as long as the volume of the inputs is sufficiently low.

Wieder, R.K.; Lang, G.E.; Whitehouse, A.E.

1984-12-01T23:59:59.000Z

6

Mixed integer model for optimizing equipment scheduling and overburden transport in a surface coal mining operation  

SciTech Connect (OSTI)

The lack of available techniques prompted the development of a mixed integer model to optimize the scheduling of equipment and the distribution of overburden in a typical mountaintop removal operation. Using this format, a (0-1) integer model and transportation model were constructed to determine the optimal equipment schedule and optimal overburden distribution, respectively. To solve this mixed integer program, the model was partitioned into its binary and real-valued components. Each problem was successively solved and their values added to form estimates of the value of the mixed integer program. Optimal convergence was indicated when the difference between two successive estimates satisfied some pre-specific accuracy value. The performance of the mixed integer model was tested against actual field data to determine its practical applications. To provide the necessary input information, production data was obtained from a single seam, mountaintop removal operation located in the Appalachian coal field. As a means of analyzing the resultant equipment schedule, the total idle time was calculated for each machine type and each lift location. Also, the final overburden assignments were analyzed by determining the distribution of spoil material for various overburden removal productivities. Subsequent validation of the mixed integer model was conducted in two distinct areas. The first dealt with changes in algorithmic data and their effects on the optimality of the model. The second area concerned variations in problem structure, specifically those dealing with changes in problem size and other user-inputed values such as equipment productivities or required reclamation.

Goodman, G.V.R.

1987-01-01T23:59:59.000Z

7

Using state-of-the-art techniques for positioning mining equipment  

SciTech Connect (OSTI)

The careful positioning of the drill rigs that drill the holes into which explosives are then loaded is critical to the success of the subsequent blast. Today a system of satellites in space, each transmitting radio signals, is being used to provide the data to allow for tracking and positioning of various types of ground-based mobile equipment. The system is the Global Positioning System or GPS for short. This paper focuses on the application of GPS to surface mining and in particular the navigating of rotary drills from hole-to-hole and their final precise positioning to drill each blast hole. The basic principles of GPS are reviewed. The need for further enhancements in the form of Differential Global Positioning System (DGPS) is explained. The unique way in which the radio signal carrier frequency is modulated and how that modulation allows precise determination of the distances to the satellites is covered. Also, some of the problems and limitations of applying DGPS to surface mining applications are presented. The issue of using DGPS to assist a drill rig operator in navigating from hole-to-hole and then ultimately positioning a drill rig where blast holes are to be drilled is then presented. Using the criteria that the centerline of the bit should fall within the diameter of the hole to be drilled, three different combinations of On-The-Fly position fix accuracies and data update rates are used to evaluate how likely it would be for the operator to locate the bit. Finally, cost estimates for DGPS installed on drill rigs are presented.

Schivley, G.P. Jr. [Drilling Technologies, Richardson, TX (United States)

1996-12-01T23:59:59.000Z

8

Equipment  

Science Journals Connector (OSTI)

...polarized d-c or a-c voltage, or insulation resistance. Range of voltage measurement...Milli-microsecond Time Interval measuring device. SPECIFICATIONS INPUT PULSE RANGE: 5 105v COUNT STORAGE...its use in any convenient location. (Thermal Dynamic Products Inc., Dept. 247...

JOSHUA STERN

1958-08-08T23:59:59.000Z

9

Equipment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Facility: Building 382 Rev. 1, 02/11/00 Facility: Building 382 Rev. 1, 02/11/00 Training: (1) ESH114 Lockout/Tagout ASD125 APS LOTO ESH371 Electrical Safety - General ESH195 PPE ESH141 Hand and Power Tools (2) ESH707 Accelerator Worker ESH738 GERT (3) ESH196 Hazard Communication ESH376 or 456 Chemical Waste (4) ASDSF6 (5) ESH170 OSHA Lead Standard ESH196 Hazard Communication ESH195 PPE ESH141 Hand and Power Tools (6) ESH195 PPE ESH141 Hand and Power Tools (7) Informal OJT (8) Formal OJT Management Tools: (A) ANL-E ESH Manual SMART (B) APS-SAD APS-CO (C) Waste Handling Procedure Manual Equipment Hazards Engineered Controls Electrical Safety Training References Electrical Safety Procedures Mechanical Safety Training References Mechanical

10

Proceedings of the sixteenth international symposium on mine planning and equipment selection (MPES 2007) and the tenth international symposium on environmental issues and waste management in energy and mineral production (SWEMP 2007)  

SciTech Connect (OSTI)

Papers presented at MPES 2007 covered: coal mining and clean coal processing technologies; control, design and planning of surface and underground mines; drilling, blasting and excavation engineering; mining equipment selection; automation and information technology; maintenance and production management for mines and mining systems; health, safety and environment; cost effective methods of mine reclamation; mine closure and waste disposal; and rock mechanics and geotechnical issues. Papers from SWEMP 2007 discussed methods and technologies for assessing, minimizing and preventing environmental problems associated with mineral and energy production. Topics included environmental impacts of coal-fired power projects; emission control in thermal power plants; greenhouse gas abatement technologies; remediation of contaminated soil and groundwater; environmental issues in surface and underground mining of coal, minerals and ores; managing mine waste and mine water; and control of effluents from mineral processing, metallurgical and chemical plants.

Singhal, R.K.; Fytas, K.; Jongsiri, S.; Ge, Hao (eds.) [Universite Laval, Quebec, PQ (Canada)

2007-07-01T23:59:59.000Z

11

Mining  

Broader source: Energy.gov [DOE]

Supply and cost management–including energy costs–pose key challenges for U.S. mining companies. The industry has worked with AMO to develop a range of resources for increasing energy efficiency and reducing costs.

12

CONCEPTUAL DESIGN FOR A RADICALLY SMALLER, HIGHLY ADAPTIVE AND APPLICATION-FLEXIBLE MINING MACHINE FOR UTILITY AND DEVELOPMENT WORK  

SciTech Connect (OSTI)

The aim of this research project was to develop a preliminary ''conceptual design'' for a radically smaller, highly adaptive and application-flexible underground coal mining machine, for performing non-production utility work and/or also undertake limited production mining for the recovery of reserves that would otherwise be lost. Whereas historically, mining philosophies have reflected a shift to increasing larger mechanized systems [such as the continuous miner (CM)], specific mining operations that do not benefit from the economy of the large mining equipment are often ignored or addressed with significant inefficiencies. Developing this prototype concept will create a new class of equipment that can provide opportunities to re-think the very structure of the mining system across a broad range of possibilities, not able to be met by existing machinery. The approach involved pooling the collective input from mining professionals, using a structured listing of desired inputs in the form of a questionnaire, which was used to define the range of desired design specifications. From these inputs, a conceptual specification was blended, by the author, to embody the general concurrence of mission concepts for this machine.

Andrew H. Stern

2004-12-20T23:59:59.000Z

13

Commercial equipment cost database  

SciTech Connect (OSTI)

This report, prepared for DOE, Office of Codes and Standards, as part of the Commercial Equipment Standards Program at Pacific Northwest Laboratory, specifically addresses the equipment cost estimates used to evaluate the economic impacts of revised standards. A database including commercial equipment list prices and estimated contractor costs was developed, and through statistical modeling, estimated contractor costs are related to equipment parameters including performance. These models are then used to evaluate cost estimates developed by the ASHRAE 90.1 Standing Standards Project Committee, which is in the process of developing a revised ASHRAE 90.1 standard. The database will also be used to support further evaluation of the manufacturer and consumer impacts of standards. Cost estimates developed from the database will serve as inputs to economic modeling tools, which will be used to estimate these impacts. Preliminary results suggest that list pricing is a suitable measure from which to estimate contractor costs for commercial equipment. Models developed from these cost estimates accurately predict estimated costs. The models also confirm the expected relationships between equipment characteristics and cost. Cost models were developed for gas-fired and electric water heaters, gas-fired packaged boilers, and warm air furnaces for indoor installation. Because of industry concerns about the use of the data, information was not available for the other categories of EPAct-covered equipment. These concerns must be addressed to extend the analysis to all EPAct equipment categories.

Freeman, S.L.

1995-01-01T23:59:59.000Z

14

Cleanroom Equipment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Conventional Machining Engis Lapping and Polishing Machine MET One particle Counter Sand Blaster Cabinet Flycutting Machine Lithography Equipment Mann 600 Pattern Generator Oriel...

15

Survey of nine surface mines in North America. [Nine different mines in USA and Canada  

SciTech Connect (OSTI)

This report presents the information gathered by three mining engineers in a 1980 survey of nine surface mines in the United States and Canada. The mines visited included seven coal mines, one copper mine, and one tar sands mine selected as representative of present state of the art in open pit, strip, and terrace pit mining. The purpose of the survey was to investigate mining methods, equipment requirements, operating costs, reclamation procedures and costs, and other aspects of current surface mining practices in order to acquire basic data for a study comparing conventional and terrace pit mining methods, particularly in deeper overburdens. The survey was conducted as part of a project under DOE Contract No. DE-AC01-79ET10023 titled The Development of Optimal Terrace Pit Coal Mining Systems.

Hayes, L.G.; Brackett, R.D.; Floyd, F.D.

1981-01-01T23:59:59.000Z

16

Fire suppression and detection equipment  

SciTech Connect (OSTI)

Inspection and testing guidelines go beyond the 'Code of Federal Regulation'. Title 30 of the US Code of Federal Regulations (30 CFR) contains requirements and references to national standards for inspection, testing and maintenance of fire suppression and detection equipment for mine operators. However, federal requirements have not kept pace with national standards and best practices. The article lists National Fire Protection (NFPA) standards that are referenced by the US Mine Safety and Health Administration (MSHA) in 30 CFR. It then discusses other NFPA Standards excluded from 30 CFR and explains the NFPA standard development process. 2 refs., 3 tabs., 5 photos.

E.E. Bates [HSB Professional Loss Control, Lexington, KY (United States)

2006-01-15T23:59:59.000Z

17

Equipment Selection for Surface Mining: A Review  

E-Print Network [OSTI]

electric rope, hydraulic excavators including backhoe excavators, and front-end .... (2000) provides a method for determining a rolling resistance estimate.

2013-07-19T23:59:59.000Z

18

Refiner Crude Oil Inputs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Day) Refiner Percent Operable Utilization Net Inputs (Refiner and Blender) of Motor Gasoline Blending Comp Net Inputs (Refiner and Blender) of RBOB Blending Components Net...

19

Ex Parte Communications with Caterpillar Global Mining LLC  

Broader source: Energy.gov [DOE]

Mr. Medenwaldt inquired, by emails on August 7 and 8, 2012, whether the proposed energy conservation standards rulemaking would affect above ground mobile mining equipment that would have...

20

Longwall mining  

SciTech Connect (OSTI)

As part of EIA`s program to provide information on coal, this report, Longwall-Mining, describes longwall mining and compares it with other underground mining methods. Using data from EIA and private sector surveys, the report describes major changes in the geologic, technological, and operating characteristics of longwall mining over the past decade. Most important, the report shows how these changes led to dramatic improvements in longwall mining productivity. For readers interested in the history of longwall mining and greater detail on recent developments affecting longwall mining, the report includes a bibliography.

NONE

1995-03-14T23:59:59.000Z

Note: This page contains sample records for the topic "inputs mining equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

E-Print Network 3.0 - ancillary equipment unit Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

from Purchased Steel (331210); Mining Machinery & Equipment Manufacturing (333131); Oil & Gas Field Source: Boyer, Elizabeth W. - School of Forest Resources, Pennsylvania...

22

Laboratory Equipment Donation Program - Equipment Applications  

Office of Scientific and Technical Information (OSTI)

Specific questions concerning equipment should be directed to the point of Specific questions concerning equipment should be directed to the point of contact responsible for the item(s) under consideration. This information is listed on the "Equipment Information" page, as well as on the grant award e-mail sent to the applicant. Step 1: Search and Apply for Equipment Note: If you know the Item Control Number of the equipment you need, you may go directly to the on-line application. Please follow these procedures to "Search Equipment" and apply for equipment using the LEDP Online Application: Select the "Search Equipment" menu link. Enter the type of equipment desired into the search box or choose the "Equipment List" link, which will allow you see a complete list of available equipment. Select the "Item Control Number" for the desired equipment. This

23

UK mining invests, suppliers profit  

SciTech Connect (OSTI)

In the midst of a major economic crisis in the United Kingdom, equipment suppliers have been reporting a number of considerable purchases by British coal mining companies. In December 2008, Liebherr-Great Britain delivered the first two of four Rq350 Litronic hydraulic excavators for use at the Broken Cross opencast coal site in Lanarkshire, Scotland. Ten Terex TR100 rigid haulers were delivered to the site in late 2008. Hatfield Colliery at Stainforth, South Yorkshire, has been reopened by PowerFuel. The main equipment for two longwall faces was supplied by Joy Mining Machinery UK Ltd. 2 photos.

NONE

2009-04-15T23:59:59.000Z

24

Mining (Montana)  

Broader source: Energy.gov [DOE]

This section provides general rules and regulations pertaining to mining practices in the state of Montana. It addresses mining locations and claims, procedures for rights-of-way and eminent domain...

25

Automatic input rectification  

E-Print Network [OSTI]

We present a novel technique, automatic input rectification, and a prototype implementation, SOAP. SOAP learns a set of constraints characterizing typical inputs that an application is highly likely to process correctly. ...

Long, Fan

26

Automatic Input Rectification  

E-Print Network [OSTI]

We present a novel technique, automatic input rectification, and a prototype implementation called SOAP. SOAP learns a set of constraints characterizing typical inputs that an application is highly likely to process ...

Long, Fan

2011-10-03T23:59:59.000Z

27

TART input manual  

SciTech Connect (OSTI)

The TART code is a Monte Carlo neutron/photon transport code that is only on the CRAY computer. All the input cards for the TART code are listed, and definitions for all input parameters are given. The execution and limitations of the code are described, and input for two sample problems are given. (WHK)

Kimlinger, J.R.; Plechaty, E.F.

1982-04-01T23:59:59.000Z

28

Review: Brief survey of crowdsourcing for data mining  

Science Journals Connector (OSTI)

Crowdsourcing allows large-scale and flexible invocation of human input for data gathering and analysis, which introduces a new paradigm of data mining process. Traditional data mining methods often require the experts in analytic domains to annotate ... Keywords: Crowdsourcing, Data mining, Quality control, Survey

Guo Xintong, Wang Hongzhi, Yangqiu Song, Gao Hong

2014-12-01T23:59:59.000Z

29

Precision Mining  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Precision Mining Precision Mining Double Beta Decay Dark Matter Biology Repository Science Renewable Energy Precision Mining at WIPP is Routine All tunnels that make up the WIPP underground are mined with the same precision that is exhibited in this photo. Typical drift cross sections are about 8m x 4m. Custom excavation and maintenance of openings of any configuration can be made. In 2005, WIPP completed renovations to the 6,000 cubic meter North Experimental Area (NExA). The area, located at the northern end of the mine, was refurbished through rib trimming, floor grading, removal of loose muck, ground support and restoration of basic lighting and mine communications. As of 2010, the NExA is used for the Enriched Xenon Observatory (EXO), the Dark Matter Time Projection Chamber (DMTPC)

30

REAL ESTATE & EQUIPMENT LEASING / RENTAL CALIFORNIA LAWRENCE BERKELEY LAB  

Broader source: Energy.gov (indexed) [DOE]

REAL ESTATE & EQUIPMENT LEASING / RENTAL REAL ESTATE & EQUIPMENT LEASING / RENTAL CALIFORNIA LAWRENCE BERKELEY LAB POC David Chen Telephone (510) 486-4506 Email dtchen@lbl.gov Construction, Mining, and Forestry Machinery and Equipment Rental and Leasing 532412 Office Machinery and Equipment Rental and Leasing 532420 LAWRENCE LIVERMORE LAB POC Jill Swanson Telephone (925) 423-4535 Email swanson6@llnl.gov Construction, Mining, and Forestry Machinery and Equipment Rental and Leasing 532412 Office Machinery and Equipment Rental and Leasing 532420 COLORADO GOLDEN FIELD OFFICE POC Karen Downs Telephone (720) 356-1269 Email karen.downs@go.doe.gov Lessors of Residential Buildings and Dwellings 531110 Lessors of Nonresidential Buildings (except Miniwarehouses) 531120 Lessors of Miniwarehouses and Self-Storage Units 531130 Truck, Utility Trailer, and RV (Recreational Vehicle) Rental and Leasing

31

ITP Mining: Exploration and Mining Technology Roadmap  

Broader source: Energy.gov [DOE]

This document describes the Mining Industry of the Future's development of technology roadmaps to guide collaborative research activities for mining.

32

User Electrical Equipment Inspections  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

User Electronic and Electrical Equipment Inspection Criteria In order to be in compliance with NEC, OSHA, and DOE regulations all electronic and electrical equipment at the APS...

33

NOVEL EXCAVATION TECHNOLOGIES FOR EFFICIENT AND ECONOMIC SURFACE MINING  

SciTech Connect (OSTI)

Ground excavation constitutes a significant component of production costs in any surface mining operation. The excavation process entails material digging and removal in which the equipment motion is constrained by the workspace geometry. A major excavation problem is the variability of material properties, resulting in varying mechanical energy input and stress loading of shovel dipper-and-tooth assembly across the working bench. This variability has a huge impact on the shovel dipper and tooth assembly in hard formations. With this in mind, the primary objectives of the project were to (i) provide the theoretical basis to develop the Intelligent Shovel Excavation (ISE) technology to solve the problems associated with excavation in material formations; (ii) advance knowledge and frontiers in shovel excavation through intelligent navigation; and (iii) submit proposal for the design, development and implementation of the ISE technology for shovel excavation at experimental surface mining sites. The mathematical methods were used to (i) develop shovel's kinematics and dynamics, and (ii) establish the relationship between shovel parameters and the resistive forces from the material formation during excavation process. The ADAMS simulation environment was used to develop the hydraulic and cable shovel virtual prototypes. Two numerical examples are included to test the theoretical hypotheses and the obtained results are discussed. The area of sensor technology was studied. Application of specific wrist-mounted sensors to characterize the material, bucket and frame assembly was determined. Data acquisition, display and control system for shovel loading technology was adopted. The concept of data acquisition and control system was designed and a shovel boom stresses were simulated. A multi-partner collaboration between research organizations, shovel manufacturer, hardware and sensor technology companies, and surface mining companies is proposed to test design features, construct a field ready prototype and perform field testing at the surface mining sites. It is anticipated that 10% in energy savings including electricity (cable shovel) and fuel (hydraulic shovel) will be achieved by implementation of ISE technology.

Vladislav Kecojevic; Samuel Frimpong

2005-05-01T23:59:59.000Z

34

University of Delaware | CCEI Equipment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CCEI Equipment Click column headings to sort Type Equipment Details Institution Type Equipment Details Institution: Lab Lab BACK TO TOP...

35

Logistics background study: underground mining  

SciTech Connect (OSTI)

Logistical functions that are normally associated with US underground coal mining are investigated and analyzed. These functions imply all activities and services that support the producing sections of the mine. The report provides a better understanding of how these functions impact coal production in terms of time, cost, and safety. Major underground logistics activities are analyzed and include: transportation and personnel, supplies and equipment; transportation of coal and rock; electrical distribution and communications systems; water handling; hydraulics; and ventilation systems. Recommended areas for future research are identified and prioritized.

Hanslovan, J. J.; Visovsky, R. G.

1982-02-01T23:59:59.000Z

36

Mining | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Mining Industry, July 2003 Exploration and Mining Roadmap (2002) Mineral Processing Technology Roadmap (2000) Education Roadmap for Mining Professionals (2002) Energy and...

37

Mines and Mining (Maryland) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Mines and Mining (Maryland) Mines and Mining (Maryland) Mines and Mining (Maryland) < Back Eligibility Commercial Construction Fed. Government Industrial Institutional Investor-Owned Utility Local Government Municipal/Public Utility Retail Supplier Rural Electric Cooperative Systems Integrator Tribal Government Utility Program Info State Maryland Program Type Safety and Operational Guidelines Siting and Permitting Provider Maryland Department of the Environment It is the policy of the state to encourage the development of mined resources in Maryland while protecting the environment and public health and safety. This legislation establishes the Bureau of Mines within the Department of the Environment and provides for the establishment of rules and regulations governing mining activity. The legislation addresses the

38

Appliances and Commercial Equipment Standards  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Commercial and Industrial Pumps Commercial and Industrial Pumps Sign up for e-mail updates on regulations for this and other products Pumps are used in agriculture, oil and gas production, water and wastewater, manufacturing, mining, and commercial building systems. Currently there are no energy conservation standards for pumps. The Department of Energy (DOE) will conduct an analysis of the energy use, emissions, costs, and benefits associated with this equipment during the commercial and industrial pumps energy conservation standards rulemaking. Recent Updates | Standards | Test Procedures | Waiver, Exception, and Exemption Information | Statutory Authority | Historical Information | Contact Information Recent Updates DOE published a notice of public meeting and availability of the framework document. 78 FR 7304 (Feb. 1, 2013). For more information, please see the rulemaking page.

39

Agricultural Equipment | Open Energy Information  

Open Energy Info (EERE)

Equipment Incentives Retrieved from "http:en.openei.orgwindex.php?titleAgriculturalEquipment&oldid267143...

40

Energy Audit Equipment  

E-Print Network [OSTI]

The tools (equipment) needed to perform an energy audit include those items which assist the auditor in measuring the energy used by equipment or lost in inefficiency. Each tool is designed for a specific measurement. They can be inexpensive simple...

Phillips, J.

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "inputs mining equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Mining API Error-Handling Specifications from Source Code  

Science Journals Connector (OSTI)

API error-handling specifications are often not documented, ... , we present a novel framework for mining API error-handling specifications automatically from API client code, without any user input. ... to disti...

Mithun Acharya; Tao Xie

2009-01-01T23:59:59.000Z

42

NUPlans Budgeting Grant Input View  

E-Print Network [OSTI]

NUPlans Budgeting Grant Input View FMS704 NUPlansGrantInputViewV2 Last updated 4/7/2014 - rb © 2014 Northwestern University FMS704 NUPlans Contributor Budgeting 1 of 5 NUPlans Grant Input View NUPlans enables schools and units with grant projects to input grant expense estimates per project for the next fiscal

Shull, Kenneth R.

43

ITP Mining: Mining Industry Roadmap for Crosscutting Technologies...  

Broader source: Energy.gov (indexed) [DOE]

ccroadmap.pdf More Documents & Publications ITP Mining: Exploration and Mining Technology Roadmap ITP Mining: Mining Industry of the Future Mineral Processing Technology...

44

Laboratory Equipment Donation Program - Equipment List  

Office of Scientific and Technical Information (OSTI)

Equipment List Equipment List Already know the item control number? Submit Reset Item Control Number Equipment Name Date Entered Condition Picture 89022833290004 1300594 TLD DETECTOR 12/16/2013 Repairable N/A 89022833290005 1300595 PICOMETER 12/16/2013 Repairable N/A 89022833290008 1300598 READER 12/16/2013 Repairable N/A 89022833290010 1300600 DETECTOR VACUUM PUMP 12/16/2013 Repairable N/A 89022833290016 1300606 TLD READER 12/16/2013 Repairable N/A 89022833290018 1300608 READER 12/16/2013 Repairable N/A 89022833290019 1300609 ANALYZER WITH DETECTOR 12/16/2013 Repairable N/A 89022833180013 1300993 PRESSURE REGULATOR 12/04/2013 Repairable N/A 89022833180022 1301098 VACUUM GAUGE 12/04/2013 Repairable N/A 89022833180023 1301099 OSCILLOSCOPE 12/04/2013 Repairable N/A

45

Longwall mining of thin seams  

SciTech Connect (OSTI)

Thin seam operations pose a challenge to the ingenuity of mining engineers to overcome the factor of human inconvenience in the restricted environment and associated high cost production. Surprisingly, low seam longwalls in the Federal Republic of Germany in an average thickness of 35 in. and dipping less than 18/sup 0/ come close to achieving the average production rate of all German longwall operations. They are all plow faces, and a consistent production of 3300 tons per day and a productivity of 40 tons per man shift are reported from one of the thin seam longwalls. These results were attained by reliable high-capacity equipment and roof support by shields that can be collapsed to as low as 22 inches. Maximum mining height for plow operated faces lies at 31.5 inches. Technology for mechanized mining of flat lying coalbeds less than 31.5 inches in thickness without rock cutting is not available, and firmness of coal, undulation of the strata, coalbed thickness variation, and the necessity of cutting rock, particularly through faults, set limits to plow application. The in-web shearer can be used in firm coal to a minimum mining height of 40 inches, and a daily production of 1650 to 2200 tons is reported from a longwall in the Saar district of Germany equipped with such a shearer and shields. Numerous in-web shearers are employed in the United Kingdom; reports as to their success are contradictory. Also, experience in the United States, though limited, has been negative. The steady increase in output from single drum shearer faces in Pennsylvania is a remarkable achievement, and occasional record breaking peaks in production indicate the potential of such mining. Technology development for the future is discussed.

Curth, E A

1981-01-01T23:59:59.000Z

46

Motor technology for mining applications advances  

SciTech Connect (OSTI)

AC motors are steadily replacing DC motors in mining and mineral processing equipment, requiring less maintenance. The permanent magnet rotor, or the synchronous motor, has enabled Blador to introduce a line of cooling tower motors. Synchronous motors are soon likely to take over from the induction motor. 1 photo.

Fiscor, S.

2009-08-15T23:59:59.000Z

47

Development of surface mine cost estimating equations  

SciTech Connect (OSTI)

Cost estimating equations were developed to determine capital and operating costs for five surface coal mine models in Central Appalachia, Northern Appalachia, Mid-West, Far-West, and Campbell County, Wyoming. Engineering equations were used to estimate equipment costs for the stripping function and for the coal loading and hauling function for the base case mine and for several mines with different annual production levels and/or different overburden removal requirements. Deferred costs were then determined through application of the base case depreciation schedules, and direct labor costs were easily established once the equipment quantities (and, hence, manpower requirements) were determined. The data points were then fit with appropriate functional forms, and these were then multiplied by appropriate adjustment factors so that the resulting equations yielded the model mine costs for initial and deferred capital and annual operating cost. (The validity of this scaling process is based on the assumption that total initial and deferred capital costs are proportional to the initial and deferred costs for the primary equipment types that were considered and that annual operating cost is proportional to the direct labor costs that were determined based on primary equipment quantities.) Initial capital costs ranged from $3,910,470 in Central Appalachia to $49,296,785; deferred capital costs ranged from $3,220,000 in Central Appalachia to $30,735,000 in Campbell County, Wyoming; and annual operating costs ranged from $2,924,148 in Central Appalachia to $32,708,591 in Campbell County, Wyoming. (DMC)

Not Available

1980-09-26T23:59:59.000Z

48

Electric Vehicle Supply Equipment  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Procurement of Electric Vehicle Supply Equipment This Guidance provides a description of the types of requirements to be included in an employer's workplace charging request for...

49

Renewable Energy Equipment Exemption  

Broader source: Energy.gov [DOE]

Iowa allow a sales tax exemption for solar, wind, and hydroelectricity equipment. As of May 2013, the Iowa sales tax rate is 6%.

50

Maersk Line Equipment guide  

National Nuclear Security Administration (NNSA)

a total capacity of 85 cubic metres We offer various types of extra equipment: * Hanger beams which allow transport of garments on hangers without further packing * Lashing bars...

51

Prioritization Tool Measurement Input Form  

Broader source: Energy.gov [DOE]

BTO encourages stakeholders to recommend updates and improvements to the Prioritization Tool by using the below Measure Input Form.

52

Appliances and Commercial Equipment Standards  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Commercial Warm Air Furnaces Commercial Warm Air Furnaces Sign up for e-mail updates on regulations for this and other products The Department of Energy (DOE) has regulated the energy efficiency level of commercial warm air furnaces since 1994. Commercial warm air furnaces are self-contained oil-fired or gas-fired furnaces that are designed to supply heated air through ducts to spaces that require it. Commercial warm air furnaces are industrial equipment and have a maximum rated input capacity of 225,000 British thermal units (Btu) an hour or more. Recent Updates | Standards | Test Procedures | Waiver, Exception, and Exemption Information | Statutory Authority | Historical Information | Contact Information Recent Updates DOE published a request for information regarding energy conservation standards for commercial warm air furnaces. 78 FR 25627 (May 2, 2013). For more information, please see the rulemaking webpage.

53

Insulation of Electrical Equipment  

Science Journals Connector (OSTI)

... A VACATION 'school' on the insulation of electrical equipment was held in the Electrical Engineering Department of the Imperial College of ... the universities. The purpose of the course was to consider the factors which are limiting insulation design in the main classes of electrical equipment, and the general principles which should ...

1952-12-13T23:59:59.000Z

54

Semi autonomous mine detection system  

SciTech Connect (OSTI)

CMMAD is a risk reduction effort for the AMDS program. As part of CMMAD, multiple instances of semi autonomous robotic mine detection systems were created. Each instance consists of a robotic vehicle equipped with sensors required for navigation and marking, a countermine sensors and a number of integrated software packages which provide for real time processing of the countermine sensor data as well as integrated control of the robotic vehicle, the sensor actuator and the sensor. These systems were used to investigate critical interest functions (CIF) related to countermine robotic systems. To address the autonomy CIF, the INL developed RIK was extended to allow for interaction with a mine sensor processing code (MSPC). In limited field testing this system performed well in detecting, marking and avoiding both AT and AP mines. Based on the results of the CMMAD investigation we conclude that autonomous robotic mine detection is feasible. In addition, CMMAD contributed critical technical advances with regard to sensing, data processing and sensor manipulation, which will advance the performance of future fieldable systems. As a result, no substantial technical barriers exist which preclude – from an autonomous robotic perspective – the rapid development and deployment of fieldable systems.

Douglas Few; Roelof Versteeg; Herman Herman

2010-04-01T23:59:59.000Z

55

Mining multimedia data  

Science Journals Connector (OSTI)

Data Mining is a young but flourishing field. Many algorithms and applications exist to mine different types of data and extract different types of knowledge. Mining multimedia data is, however, at an experimental stage.We have implemented a prototype ... Keywords: data cube, data mining, data warehousing, image analysis, information retrieval, multimedia, world-wide web

Osmar R. Zaďane; Jiawei Han; Ze-Nian Li; Jean Hou

1998-11-01T23:59:59.000Z

56

Equip Tourists with Knowledge Mined from Travelogues , Changhu Wang  

E-Print Network [OSTI]

-representative knowledge such as attractions (e.g., Golden Gate Bridge), styles (e.g., beach, history), and activ- ities (e

Narasayya, Vivek

57

Rights and Duties of Mines and Mine Owners, General (Missouri)  

Broader source: Energy.gov [DOE]

This legislation addresses general operational guidelines for mine owners regarding public notices, fees, land and mineral ownership, requirements for mining in certain municipalities, and mining...

58

,"U.S. Blender Net Input"  

U.S. Energy Information Administration (EIA) Indexed Site

Blender Net Input of Residuum (Thousand Barrels)","U.S. Blender Net Input of Gasoline Blending Components (Thousand Barrels)","U.S. Blender Net Input of Reformulated...

59

Equipment Insulation | Open Energy Information  

Open Energy Info (EERE)

List of Equipment Insulation Incentives Retrieved from "http:en.openei.orgwindex.php?titleEquipmentInsulation&oldid267163" Category: Articles with outstanding TODO tasks...

60

NSLS Electrical Equipment Inspection  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Electrical Equipment Inspection Information Electrical Equipment Inspection Information A note to vendors visiting NSLS A note to users visiting NSLS Proteus Electrical Conformity Remediation Currently Certified Electrical Equipment Inspectors: First Line Contacts Email Extension Poshka, Dennis poshka@bnl.gov 2825 Alternate Contacts Boerner Jr, Albert aboerner@bnl.gov 5990 Buda, Scott buda@bnl.gov 3914 Caruso, Michael caruso@bnl.gov 4100 Chmiel, Robert chmiel@bnl.gov 8141 Church, Randolph church@bnl.gov 2736 Clay, Barret clay@bnl.gov 7284 D'Alsace, Roy dalsace@bnl.gov 3973 Danneil, Christopher cdanneil@bnl.gov 8609 Davila, Peter davila@bnl.gov 7625 De Toll, Peter detoll@bnl.gov 4100 Durfee, Douglas ddurfee@bnl.gov 7625 Fulkerson, Michael fulkerso@bnl.gov 5194 Gallagher, John jgallagher@bnl.gov 5770 Harder, David dharder@bnl.gov 4978

Note: This page contains sample records for the topic "inputs mining equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Scientist Equipment and Outline  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Outline and Equipment Outline and Equipment LIGHT AND COLOR Grade levels: can be adapted for grades 2-8. Length of time: 30-45 minues. Room preference: Double classroom or all-purpose room. Equipment is located in the Lederman Science Center. Talk to Susan Dahl to borrow this set. Spectrum tube power supply, gas tubes and diffraction grating glasses Light box with red, green, and blue translucent film Power chord, extension chord Large set of lenses Small concave and convex lenses Magnetic optics kit, includes a small laser Slinky Flashlight Clear plastic tub, powdered milk Water Radiometer Electromagnetic energy spectrum poster Set of red, green and blue flood lights Where does light come from? Use a boy and a girl to make a human demonstration of molecules and atoms. Have students rub their hands together and notice friction equals heat.

62

Equipment Operational Requirements  

SciTech Connect (OSTI)

The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

2009-06-11T23:59:59.000Z

63

Characterization of industrial process waste heat and input heat streams  

SciTech Connect (OSTI)

The nature and extent of industrial waste heat associated with the manufacturing sector of the US economy are identified. Industry energy information is reviewed and the energy content in waste heat streams emanating from 108 energy-intensive industrial processes is estimated. Generic types of process equipment are identified and the energy content in gaseous, liquid, and steam waste streams emanating from this equipment is evaluated. Matchups between the energy content of waste heat streams and candidate uses are identified. The resultant matrix identifies 256 source/sink (waste heat/candidate input heat) temperature combinations. (MHR)

Wilfert, G.L.; Huber, H.B.; Dodge, R.E.; Garrett-Price, B.A.; Fassbender, L.L.; Griffin, E.A.; Brown, D.R.; Moore, N.L.

1984-05-01T23:59:59.000Z

64

Emergency Facilities and Equipment  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This volume clarifies requirements of DOE O 151.1 to ensure that emergency facilities and equipment are considered as part of emergency management program and that activities conducted at these emergency facilities are fully integrated. Canceled by DOE G 151.1-4.

1997-08-21T23:59:59.000Z

65

Equipment for ?-Radiography  

Science Journals Connector (OSTI)

... felt for a well-designed protective carrier and exposure unit for use with radium or radon. The announcement that Johnson Matthey and Co., Ltd., are manufacturing protective equipment ... will assist the industrial radiologist to take advantage of the improved supplies of radium and radon which are now available (Nature, June 4, 1949, p. 867). ...

1949-09-10T23:59:59.000Z

66

Mining Industry Profile  

Broader source: Energy.gov [DOE]

The U.S. mining industry consists of the search for, extraction, beneficiation, and processing of naturally occurring solid minerals from the earth. These mined minerals include coal, metals such...

67

Mining Regulations (Missouri)  

Broader source: Energy.gov [DOE]

This legislation applies to all mines in this state engaged in the mining or extraction of minerals for commercial purposes, except barite, marble, limestone, and sand and gravel, or the...

68

field_equipment.indd  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

EQUIPMENT INVENTORY EQUIPMENT INVENTORY Trucks * Five vac/pressure trucks, 60-90 bbl, up to 5 bpm at 5,000 lb. * Water/fi re truck, 110 bbl * Two dump trucks: 5-yard and 12-yard * Belly dump trailer * Chemical injection truck, 20 bbl capacity * Three crane trucks: 6,000 lb., 8,000 lb., and 30 ton * Klaeger swab truck * Rig-up truck with 21-foot poles, 30,000-lb. capacity * Winch truck, 40,000-lb. capacity * Two bucket trucks: 25-foot and 28-foot reach * Two welding trucks with Miller Trailblazer welder * Two Ditch Witches: 8" x 7' and 6" x 3" * International PayStar 5000 transport truck * Western Star transport truck Backhoes & Loaders * John Deere 410G backhoe * Cat 420 backhoe * Case 20W loader with 2-yard bucket * Bobcat skid loader with bucket, forks, post hole digger, and trencher attachments

69

Handling Ambiguity via Input-Output Kernel Learning Xinxing Xu Ivor W. Tsang Dong Xu  

E-Print Network [OSTI]

of Computer Engineering, Nanyang Technological University, Singapore xuxi0006@ntu.edu.sg IvorTsang@ntu.edu.sg dongxu@ntu.edu.sg Abstract--Data ambiguities exist in many data mining and machine learning applications the effectiveness of our proposed IOKL framework. Keywords-Group Multiple Kernel Learning; Input-Output Kernel

Tsang Wai Hung "Ivor"

70

Equipment Certification | Open Energy Information  

Open Energy Info (EERE)

Equipment Certification Equipment Certification Jump to: navigation, search Policies requiring renewable energy equipment to meet certain standards serve to protect consumers from buying inferior equipment. These requirements not only benefit consumers; they also protect the renewable energy industry by making it more difficult for substandard systems to reach the market. [1] Equipment Certification Incentives CSV (rows 1 - 19) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active Canada Oil and Gas Operations Act (Canada) Environmental Regulations Equipment Certification Fees Generating Facility Rate-Making Generation Disclosure Industry Recruitment/Support Safety and Operational Guidelines Siting and Permitting Canada Commercial Construction Developer

71

GPS-based slope monitoring systems and their applications in transition mining from open-pit to underground  

Science Journals Connector (OSTI)

Combining methods of open-pit and underground mining can yield maximum economic outcomes, while they may also cause large-scaled geological hazards, such as landslides. Failure to prevent landslides in mining areas could result in losses and damages to equipment, surrounding environments, and even human lives. In this paper, we report the application of global positioning system (GPS) for monitoring the Anjialing Coal Mine, the first mine in China that employs the combining methods of open-pit and underground mining. Mine slopes with different inclined angles were monitored and precise data of ground movements were obtained. Mathematic modelling of the subsidence rate over time has successfully detected the occurrence of terminal subsidence rate and a corresponding a landslide. The equipment and persons involved were evacuated and kept safe before the medium landslide occurred. In conclusion, the GPS monitoring system is proved to be effective in mitigating the geological hazards in mining areas.

Gang Chen; Xingwen Cheng; Weitao Chen; Xianju Li; Liangbiao Chen

2014-01-01T23:59:59.000Z

72

Early Equipment Management  

E-Print Network [OSTI]

starting with the ones that could cause the most human harm. This is also an excellent time to discuss all the lockout/tagout points on the machine, determine how much safety training is necessary and if there are enough warning stickers. The idea... needed. One-point lessons should be completed on all inspection, lubrication, and lockout/tagout points. Equipment labels should be created at this time including lockout/tagout and predetermined set-points. The key to a successful EEM program...

Schlie, Michelle

2007-05-18T23:59:59.000Z

73

China production equipment sourcing strategy  

E-Print Network [OSTI]

This thesis recommends a China business and equipment strategy for the Controls Conveyor Robotics Welding (CCRW) group at General Motors. The current strategy is to use globally common equipment through predetermined global ...

Chouinard, Natalie, 1979-

2009-01-01T23:59:59.000Z

74

A new high performance AC to DC rectifier with input power factor correction and harmonic reduction capacity  

E-Print Network [OSTI]

Many conventional switching power supplies in data processing equipment and low power motor drive systems operate by rectifying the input ac line voltage and filtering it with large electrolytic capacitors. Because this process involves both...

Martinez, Roberto

2012-06-07T23:59:59.000Z

75

Intermediate inputs and economic productivity  

Science Journals Connector (OSTI)

...US sectoral-level production functions. Both the...316) and plastics and rubber-(326). The relationship...coefficients of the production function sum to a quantity...inputs were used in the production process. 16 This estimate...products 326 plastics and rubber products 327 non-metallic...

2013-01-01T23:59:59.000Z

76

PADD 3 Weekly Inputs & Utilization  

U.S. Energy Information Administration (EIA) Indexed Site

Utilization 97.4 95.3 94.8 94.9 95.9 92.2 2010-2015 Refiner and Blender Net Inputs Motor Gasoline Blending Components -2,174 -2,008 -2,012 -2,095 -2,214 -2,291 2004-2015 RBOB -283...

77

Resources Abstracts Input Transaction Form  

E-Print Network [OSTI]

#12;Resources Abstracts Input Transaction Form 4. Title 5. Report Date 6.Urban Aquaculture Covered The University of the District of Columbia 12. Sponsoring Organization Water Resources Research of the rainbow trout (Salmo gairdneri) in a closed recycling water system in an urban environment is described

District of Columbia, University of the

78

XsunX Inc formerly Sun River Mining Inc | Open Energy Information  

Open Energy Info (EERE)

XsunX Inc formerly Sun River Mining Inc XsunX Inc formerly Sun River Mining Inc Jump to: navigation, search Name XsunX Inc (formerly Sun River Mining Inc) Place Aliso Viejo, California Zip 92656 Product US-based manufacturer of thin-film PV cells and its manufacturing equipment. References XsunX Inc (formerly Sun River Mining Inc)[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. XsunX Inc (formerly Sun River Mining Inc) is a company located in Aliso Viejo, California . References ↑ "[ XsunX Inc (formerly Sun River Mining Inc)]" Retrieved from "http://en.openei.org/w/index.php?title=XsunX_Inc_formerly_Sun_River_Mining_Inc&oldid=353287" Categories: Clean Energy Organizations Companies

79

IAEA safeguards equipment  

Science Journals Connector (OSTI)

The International Atomic Energy Agency (IAEA) operates a large diversity of equipment to verify nuclear materials, contributing to the confirmation of the states' compliance with their respective nonproliferation obligations. The variety of physical and chemical properties of nuclear materials, as well as their storage environment, requires an arsenal of instruments. Additionally, the IAEA applies various containment and surveillance measures to maintain the continuity of knowledge on nuclear materials. The IAEA need ongoing equipment development to provide its inspectorate with the state-of-the-art tools for performing various safeguards activities. These activities include the measurement of declared nuclear material inventories and flows, the application of enhanced containment and surveillance measures and the search for the indicators of undeclared nuclear material and clandestine nuclear activities. The IAEA is facing increasing demands to perform remote verification of nuclear material flows utilising unattended monitoring systems. Additional analytical capabilities and effective non-destructive assay methods will be indispensable in the future for reinforcing the IAEA's ability to detect undeclared nuclear materials and activities.

M. Zendel

2008-01-01T23:59:59.000Z

80

Mining API Error-Handling Specifications from Source Code  

E-Print Network [OSTI]

Abstract. API error-handling specifications are often not documented, necessitating automated specification mining. Automated mining of error-handling specifications is challenging for procedural languages such as C, which lack explicit exception-handling mechanisms. Due to the lack of explicit exception handling, error-handling code is often scattered across different procedures and files making it difficult to mine error-handling specifications through manual inspection of source code. In this paper, we present a novel framework for mining API errorhandling specifications automatically from API client code, without any user input. In our framework, we adapt a trace generation technique to distinguish and generate static traces representing different API run-time behaviors. We apply data mining techniques on the static traces to mine specifications that define correct handling of API errors. We then use the mined specifications to detect API error-handling violations. Our framework mines 62 error-handling specifications and detects 264 real error-handling defects from the analyzed open source packages. 1 1

Mithun Acharya; Tao Xie

Note: This page contains sample records for the topic "inputs mining equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Standard for metal/nonmetal mining and metal mineral processing facilities. 2004 ed.  

SciTech Connect (OSTI)

This standard addresses the protection of diesel-powered equipment and the storage and handling of flammable and combustible liquids at these specialized sites. The 2004 edition consolidates requirements from NFPA 122 and 121 : Standard on Fire Protection for Self-Propelled and Mobile Surface Mining Equipment. Major changes include a new chapter on fire protection of surface metal mineral processing plants. The Standard is also revised to emphasize the use of a fire risk assessment when determining fire protection criteria. Chapter headings are: Administration; Referenced publications; Definitions; General; Fire risk assessment and risk reduction; Fire detection and suppression equipment; Fire protection for diesel-powered equipment in underground mines; Transfer of flammable or combustible liquids in underground mines; Flammable liquid storage in underground mines; Combustible liquid storage in underground mines; Fire suppression for flammable or combustible liquid storage areas in underground mines; Fire protection of surface mobile and self-propelled equipment; and Fire protection of surface metal mineral processing plants. 3 annexes.

NONE

2004-07-01T23:59:59.000Z

82

ITP Mining: Education Roadmap for Mining Professionals (December 2002)  

Broader source: Energy.gov [DOE]

A profitable and stable mining industry is vital to U.S. economic and national security. This roadmap serves to educate those professionals in the mining industry.

83

Labor and Safety: Mines and Mining Safety (Indiana)  

Broader source: Energy.gov [DOE]

This section contains labor regulations pertaining specifically to coal mine workers. The law establishes the Indiana Mining Board. The Board's duties include: collecting and distributing...

84

ITP Mining: Education Roadmap for Mining Professionals (December...  

Broader source: Energy.gov (indexed) [DOE]

of Mining Engineering University of Missouri-Rolla John R. Sturgul JRS Consulting Services Richard J. Sweigard ProfessorChair of Mining Engineering University of Kentucky...

85

ITP Mining: Mining Industry of the Future Mineral Processing...  

Broader source: Energy.gov (indexed) [DOE]

of the Future Mineral Processing Technology Roadmap ITP Mining: Mining Industry of the Future Mineral Processing Technology Roadmap mptroadmap.pdf More Documents & Publications ITP...

86

Coal Mining (Iowa)  

Broader source: Energy.gov [DOE]

These sections describe procedures for coal exploration and extraction, as well as permitting requirements relating to surface and underground coal mining. These sections also address land...

87

Mine Safety & Health Specialist  

Broader source: Energy.gov [DOE]

A successful candidate in this position will serve as the Carlsbad Field Office (CBFO) Mine Safety & Health Specialist and is primarily responsible for inspecting and evaluating the performance...

88

Measured Peak Equipment Loads in Laboratories  

E-Print Network [OSTI]

of measured equipment load data for laboratories, designersmeasured peak equipment load data from 39 laboratory spacesmeasured equipment load data from various laboratory spaces

Mathew, Paul A.

2008-01-01T23:59:59.000Z

89

Electrical Equipment Inventory and Inspection Information  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Electrical Equipment Inventory and Inspection Information APS Non-NRTL Electrical Equipment Inventory Spreadsheet ANL Recognized Reputable Electrical Equipment Manufacturer List as...

90

Coal Mining Tax Credit (Arkansas)  

Broader source: Energy.gov [DOE]

The Coal Mining Tax Credit provides an income or insurance premium tax credit of $2.00 per ton of coal mined, produced or extracted on each ton of coal mined in Arkansas in a tax year. An...

91

A life cycle comparison of greenhouse emissions for power generation from coal mining and underground coal gasification  

Science Journals Connector (OSTI)

For the emissions from energy and equipment use of underground coal mining, the data from the office of Energy Efficiency and Renewable Energy’s (EERE) hypothetical eastern U.S. underground coalmine is used (EERE

Zeshan Hyder; Nino S. Ripepi…

2014-05-01T23:59:59.000Z

92

Coal Mine Safety Act (Virginia)  

Broader source: Energy.gov [DOE]

This Act is the primary legislation pertaining to coal mine safety in Virginia. It contains information on safety rules, safety standards and required certifications for mine workers, prohibited...

93

Information technology equipment cooling system  

SciTech Connect (OSTI)

According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools warm air generated by the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat from the rack of information technology equipment.

Schultz, Mark D.

2014-06-10T23:59:59.000Z

94

INL '@work' heavy equipment mechanic  

ScienceCinema (OSTI)

INL's Cad Christensen is a heavy equipment mechanic. For more information about INL careers, visit http://www.facebook.com/idahonationallaboratory.

Christensen, Cad

2013-05-28T23:59:59.000Z

95

Commercial Kitchen & Food Service Equipment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Residential Commercial Commercial Industrial Lighting Energy Smart Grocer Program HVAC Program Shell Measures Commercial Kitchen & Food Service Equipment Plug Load New...

96

Commercial Cooking Equipment | Open Energy Information  

Open Energy Info (EERE)

Cooking Equipment Incentives Retrieved from "http:en.openei.orgwindex.php?titleCommercialCookingEquipment&oldid38063...

97

Food Service Equipment | Open Energy Information  

Open Energy Info (EERE)

Service Equipment Incentives Retrieved from "http:en.openei.orgwindex.php?titleFoodServiceEquipment&oldid380620...

98

LM Progressing with Uranium Mines Report to Congress | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Progressing with Uranium Mines Report to Congress Progressing with Uranium Mines Report to Congress LM Progressing with Uranium Mines Report to Congress July 12, 2013 - 10:50am Addthis As reported in an earlier Program Update newsletter, the U.S. Department of Energy (DOE) Office of Legacy Management (LM) is compiling data for a Report to Congress on defense-related uranium mines. DOE was directed by the U.S. Congress in this year's National Defense Authorization Act to undertake a review of, and prepare a report on, abandoned uranium mines (AUM) in the U.S. that provided ore for atomic energy defense activities. The report must be completed by July 2014. The article, "Abandoned Uranium Mines Report to Congress: LM Wants Your Input" from the January-March 2013 issue of the LM Program Update provides additional

99

DOE Seeking Input on Alternative Uses of Nickel Inventory | Department of  

Broader source: Energy.gov (indexed) [DOE]

Seeking Input on Alternative Uses of Nickel Inventory Seeking Input on Alternative Uses of Nickel Inventory DOE Seeking Input on Alternative Uses of Nickel Inventory March 9, 2007 - 10:28am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) is seeking input from industry representatives on the safe disposition of approximately 15,300 tons of nickel scrap recovered from uranium enrichment process equipment at the Department's Oak Ridge, TN, and Paducah, KY, facilities. The Expression of Interest (EOI), released today, will assist in DOE's evaluation of restricted uses of its nickel material for controlled radiological applications. These restricted uses could include use in commercial nuclear power plants, DOE nuclear facilities, or by the U.S. Navy. The Department will solicit input through May 8, 2007.

100

DOE Seeking Input on Alternative Uses of Nickel Inventory | Department of  

Broader source: Energy.gov (indexed) [DOE]

DOE Seeking Input on Alternative Uses of Nickel Inventory DOE Seeking Input on Alternative Uses of Nickel Inventory DOE Seeking Input on Alternative Uses of Nickel Inventory March 9, 2007 - 10:28am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) is seeking input from industry representatives on the safe disposition of approximately 15,300 tons of nickel scrap recovered from uranium enrichment process equipment at the Department's Oak Ridge, TN, and Paducah, KY, facilities. The Expression of Interest (EOI), released today, will assist in DOE's evaluation of restricted uses of its nickel material for controlled radiological applications. These restricted uses could include use in commercial nuclear power plants, DOE nuclear facilities, or by the U.S. Navy. The Department will solicit input through May 8, 2007.

Note: This page contains sample records for the topic "inputs mining equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Code input alternatives John C. Wright  

E-Print Network [OSTI]

Code input alternatives John C. Wright John Wright Oct 2009 ­ CSWIM Workshop@ORNL Extensible markup

Wright, John C.

102

TRANSPORT AND EMPLACEMENT EQUIPMENT DESCRIPTIONS  

SciTech Connect (OSTI)

The objective and the scope of this document are to list and briefly describe the major mobile equipment necessary for waste package (WP) Transport and Emplacement in the proposed subsurface nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the equipment are explained and summarized in the individual subsections of this document. The Transport and Emplacement equipment described in this document consists of the following: (1) WP Transporter; (2) Reusable Rail Car; (3) Emplacement Gantry; (4) Gantry Carrier; and (5) Transport Locomotive.

NA

1997-09-29T23:59:59.000Z

103

The Economic Impact of Coal Mining in New Mexico  

SciTech Connect (OSTI)

The economic impact of coal mining in New Mexico is examined in this report. The analysis is based on economic multipliers derived from an input-output model of the New Mexico economy. The direct, indirect, and induced impacts of coal mining in New Mexico are presented in terms of output, value added, employment, and labor income for calendar year 2007. Tax, rental, and royalty income to the State of New Mexico are also presented. Historical coal production, reserves, and price data are also presented and discussed. The impacts of coal-fired electricity generation will be examined in a separate report.

Peach, James; Starbuck, C.

2009-06-01T23:59:59.000Z

104

Uranium Mining and Enrichment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Overview Presentation » Uranium Mining and Enrichment Overview Presentation » Uranium Mining and Enrichment Uranium Mining and Enrichment Uranium is a radioactive element that occurs naturally in the earth's surface. Uranium is used as a fuel for nuclear reactors. Uranium-bearing ores are mined, and the uranium is processed to make reactor fuel. In nature, uranium atoms exist in several forms called isotopes - primarily uranium-238, or U-238, and uranium-235, or U-235. In a typical sample of natural uranium, most of the mass (99.3%) would consist of atoms of U-238, and a very small portion of the total mass (0.7%) would consist of atoms of U-235. Uranium Isotopes Isotopes of Uranium Using uranium as a fuel in the types of nuclear reactors common in the United States requires that the uranium be enriched so that the percentage of U-235 is increased, typically to 3 to 5%.

105

Genome mining for methanobactins  

Science Journals Connector (OSTI)

Methanotrophic bacteria have potential as a biological methane sink, and methanobactins are a set of peptides important in regulating this activity. A genome mining study highlights genes involved in methanobactin production, but also suggests that not all methanotrophs have them.

Grace E Kenney; Amy C Rosenzweig

2013-02-26T23:59:59.000Z

106

Indonesian coal mining  

SciTech Connect (OSTI)

The article examines the opportunities and challenges facing the Indonesian coal mining industry and how the coal producers, government and wider Indonesian society are working to overcome them. 2 figs., 1 tab.

NONE

2008-11-15T23:59:59.000Z

107

Strip Mine Law (Missouri)  

Broader source: Energy.gov [DOE]

This law authorizes the Land Reclamation Commission of the Department of Natural Resources to adopt and promulgate rules and regulations pertaining to strip mining of coal and reclamation, review...

108

Laboratory Equipment Donation Program - Guidelines  

Office of Scientific and Technical Information (OSTI)

The United States Department of Energy, in accordance with its The United States Department of Energy, in accordance with its responsibility to encourage research and development in the energy area, awards grants of used energy-related laboratory equipment. Universities, colleges and other non-profit educational institutions of higher learning in the United States are eligible to apply for equipment to use in energy-oriented educational programs in the life, physical, and environmental sciences, and in engineering. The equipment listed in this database is available for grant; however, specific items may be recalled for DOE use and become unavailable through the program. Frequently Asked Questions Who is eligible to apply for equipment? Any non-profit, educational institution of higher learning, such as a middle school, high school, university, college, junior college, technical

109

Appliances and Commercial Equipment Standards  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Single Package Vertical Air Conditioners and Heat Pumps Single Package Vertical Air Conditioners and Heat Pumps Sign up for e-mail updates on regulations for this and other products Manufacturers have been required to comply with the Department of Energy's energy conservation standards for single package vertical air conditioners and heat pumps as a separate equipment class since 2008. Before 2010, this equipment was regulated under the broader scope of commercial air conditioning and heating equipment. Single package vertical air conditioners and heat pumps are commercial air conditioning and heating equipment with its main components arranged in a vertical fashion. They are mainly used in modular classrooms, modular office buildings, telecom shelters, and hotels, and are typically installed on the outside of an exterior wall or in a closet against an exterior wall but inside the building.

110

LANSCE | Lujan Center | Ancillary Equipment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ancillary Equipment Ancillary Equipment For general questions, please contact the Lujan Center Sample Environments responsible: Victor Fanelli | vfanelli@lanl.gov | 505.667.8755 Sample and Equipment Shipping Instructions For questions regarding shipping procedures, contact Lujan Center Experiment Coordinator: Leilani Conradson | leilani@lanl.gov | 505.665.9505 Low Temperature Equipment Specifications Flight Path/Instrument Compatibility Responsible Displex closed-cycle refrigerators Tmin= 4 K to 12 K Tmax= 300 K to 340 K 11 - Asterix 04 - HIPPO 03 - HIPD 10 - LQD 02 - SMARTS Victor Fanelli vfanelli@lanl.gov Or particular instrument scientist Top loading closed-cycle refrigerator T = 10 K to 500 K option of in situ gas adsorption cell 07 - FDS Luke Daemon lld@lanl.gov Monika Hartl hartl@lanl.gov

111

Equipment Inventory | Sample Preparation Laboratories  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Resources Title Equipment Type Facility Laboratory Building Room Accumet Basic AB15 pH meter pH Meter SSRL BioChemMat Prep Lab 2 131 209 Agate Mortar & Pestle Sets Agilent 8453...

112

Earth-Fault Relay Equipment  

Science Journals Connector (OSTI)

... proving the reliability of the equipment. By Observing the operation of the relays at each substation with faults at selected points, the complete scheme can be put into operation with ...

1944-04-15T23:59:59.000Z

113

Bulk Hauling Equipment for CHG  

Broader source: Energy.gov (indexed) [DOE]

load of CHG Semitrailer Mass Trailer or ModuleChassis Module Mass Hydrogen Gas Mass CAPITAL EXPENDITURE FOR BULK HAULING EQUIPMENT For large consumption, total CapEx for...

114

Certified APS Electrical Equipment Inspectors  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

APS Designated Electrical Equipment Inspectors : Division Phone Page e-mail Jonathan Baldwin XSD 2-6977 4-6977 jbaldwin@aps.anl.gov Adam Brill ASD 2-9968 4-4559 abrill@aps.anl.gov...

115

Appliances and Commercial Equipment Standards  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Direct Heating Equipment and Pool Heaters Active Mode Test Procedures Direct Heating Equipment and Pool Heaters Active Mode Test Procedures Sign up for e-mail updates on regulations for this and other products The Department of Energy (DOE) is proposing to amend the active mode test procedures for direct heating equipment and pool heaters. This rulemaking is mandated by the Energy Policy and Conservation Act (EPCA). Recent Updates | Public Meeting Information | Submitting Public Comments | Milestones and Documents | Related Rulemakings | Statutory Authority | Contact Information Recent Updates DOE published a notice of proposed rulemaking regarding active mode test procedures for direct heating equipment and pool heaters. 78 FR 63410 (October 24, 2013). The comment deadline is January 7, 2014. Public Meeting Information

116

Permit for Charging Equipment Installation: Electric Vehicle Supply Equipment (EVSE)  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Compliance with the following permit will allow the installation and operation of electric vehicle charging equipment at a Compliance with the following permit will allow the installation and operation of electric vehicle charging equipment at a residence in the City, State jurisdiction. This permit addresses one of the following situations: Only an additional branch circuit would be added at the residence A hard-wired charging station would be installed at the residence. The attached requirements for wiring the charging station are taken directly out of the 2011 edition of the National Electrical Code (NEC) NFPA 70, Article 625 Electric Vehicle Charging System. This article does not provide all of the information necessary for the installation of electric vehicle charging equipment. Please refer to the current edition of the electrical code adopted by the local jurisdiction for additional installation requirements. Reference to the 2011 NEC may be

117

Energy Input Output Calculator | Open Energy Information  

Open Energy Info (EERE)

Input Output Calculator Input Output Calculator Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Energy Input-Output Calculator Agency/Company /Organization: Department of Energy Sector: Energy Focus Area: Energy Efficiency Resource Type: Online calculator User Interface: Website Website: www2.eere.energy.gov/analysis/iocalc/Default.aspx Web Application Link: www2.eere.energy.gov/analysis/iocalc/Default.aspx OpenEI Keyword(s): Energy Efficiency and Renewable Energy (EERE) Tools Language: English References: EERE Energy Input-Output Calculator[1] The Energy Input-Output Calculator (IO Calculator) allows users to estimate the economic development impacts from investments in alternate electricity generating technologies. About the Calculator The Energy Input-Output Calculator (IO Calculator) allows users to estimate

118

Materials Selection Considerations for Thermal Process Equipment...  

Broader source: Energy.gov (indexed) [DOE]

Materials Selection Considerations for Thermal Process Equipment: A BestPractices Process Heating Technical Brief Materials Selection Considerations for Thermal Process Equipment:...

119

CRAD, Nuclear Facility Construction - Mechanical Equipment -...  

Office of Environmental Management (EM)

Nuclear Facility Construction - Mechanical Equipment - June 26, 2012 CRAD, Nuclear Facility Construction - Mechanical Equipment - June 26, 2012 June 26, 2012 Nuclear Facility...

120

Request an Inspection of User Electrical Equipment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Request for an Electrical Equipment Inspection All APS User electronic and electrical equipment must be inspected before use in an experiment. Please ask your beamline to make...

Note: This page contains sample records for the topic "inputs mining equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Summary of Construction Equipment Tests and Activities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Equipment Tests A series of tests were conducted by the APS Construction Vibration Measurement Task Force using various pieces of construction equipment at the APCF...

122

Best Management Practice #11: Commercial Kitchen Equipment  

Broader source: Energy.gov [DOE]

Commercial kitchen equipment represents a large set of water users in the non-residential sector. Water efficiency for commercial kitchen equipment is especially important because high volume...

123

Assessment and management of roof fall risks in underground coal mines  

Science Journals Connector (OSTI)

Accidents caused by roof falls are commonly faced problems of underground coal mines. These accidents may have detrimental effects on workers in the form of injury, disability or fatality as well as mining company due to downtimes, interruptions in the mining operations, equipment breakdowns, etc. This study proposes a risk and decision analysis methodology for the assessment and management of risk associated with mine roof falls in underground coal mines. In the proposed methodology, risk assessment requires the determination of probabilities, possible consequences and cost of consequences. Then the risk is managed by the application of decision-making principles. The probabilities are determined by the analysis of 1141 roof fall data from 12 underground mines in the Appalachian region. The consequences are assessed based on the type of injuries observed after roof falls and the place of the mining activity. The cost of consequences is modeled by the so-called “relative cost criterion”. A decision analysis framework is developed in order to manage the evaluated risk for a single mine. Then this model is extended to a regional model for the management of the roof fall risks in the mines of whole Appalachia. The proposed model is illustrated with an example and it is found to be a powerful technique for coping with uncertainties and the management of roof fall risks.

H.S.B. Duzgun; H.H. Einstein

2004-01-01T23:59:59.000Z

124

Mining the earth  

SciTech Connect (OSTI)

Substances extracted from the earth - stone, iron, bronze - have been so critical to human development that historians name the ages of our past after them. But while scholars have carefully tracked human use of minerals, they have never accounted for the vast environmental damage incurred in mineral production. Few people would guess that a copper mining operation has removed a piece of Utah seven times the weight of all the material dug for the Panama Canal. Few would dream that mines and smelters take up to a tenth of all the energy used each year, or that the waste left by mining measures in the billions of tons - dwarfing the world's total accumulation of more familiar kinds of waste, such as municipal garbage. Indeed, more material is now stripped from the earth by mining than by all the natural erosion of the earth's rivers. The effects of mining operations on the environment are discussed under the following topics: minerals in the global economy, laying waste, at what cost cleaning up, and dipping out. It is concluded that in the long run, the most effective strategy for minimizing new damage is not merely to make mineral extraction cleaner, but to reduce the rich nations needs for virgin (non-recycled) minerals.

Young, J.E.

1992-01-01T23:59:59.000Z

125

Documentation of Calculation Methodology, Input Data, and Infrastructure  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Documentation of Calculation Methodology, Input Data, and Infrastructure Documentation of Calculation Methodology, Input Data, and Infrastructure for the Home Energy Saver Web Site Title Documentation of Calculation Methodology, Input Data, and Infrastructure for the Home Energy Saver Web Site Publication Type Report LBNL Report Number LBNL-51938 Year of Publication 2005 Authors Pinckard, Margaret J., Richard E. Brown, Evan Mills, James D. Lutz, Mithra M. Moezzi, Celina S. Atkinson, Christopher A. Bolduc, Gregory K. Homan, and Katie Coughlin Document Number LBNL-51938 Pagination 108 Date Published July 13 Publisher Lawrence Berkeley National Laboratory City Berkeley Abstract The Home Energy Saver (HES, http://HomeEnergySaver.lbl.gov) is an interactive web site designed to help residential consumers make decisions about energy use in their homes. This report describes the underlying methods and data for estimating energy consumption. Using engineering models, the site estimates energy consumption for six major categories (end uses); heating, cooling, water heating, major appliances, lighting, and miscellaneous equipment. The approach taken by the Home Energy Saver is to provide users with initial results based on a minimum of user input, allowing progressively greater control in specifying the characteristics of the house and energy consuming appliances. Outputs include energy consumption (by fuel and end use), energy-related emissions (carbon dioxide), energy bills (total and by fuel and end use), and energy saving recommendations. Real-world electricity tariffs are used for many locations, making the bill estimates even more accurate. Where information about the house is not available from the user, default values are used based on end-use surveys and engineering studies. An extensive body of qualitative decision-support information augments the analytical results.

126

PNNL: EDO - Facilities & Equipment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Facilities & Equipment Facilities & Equipment Facilities Equipment Decades of government investment on and around the Pacific Northwest National Laboratory campus has made PNNL a business-friendly resource for conducting a wide range of research. As a mission-focused organization, we are dedicated to teaming with government agencies, industry and academia to address what we believe are among the nation's most pressing needs in the areas of energy, environment, national security, and fundamental science. But behind these important missions is a wealth of supporting capabilities including incubator space, research laboratories, and user facilities that may be just what your business needs. We invite you to learn more about how we can work with businesses as well as what research laboratories and user facilities are available.

127

National Mining Association Experimental Determination  

E-Print Network [OSTI]

National Mining Association Experimental Determination of Radon Fluxes over Water #12;Introduction research funded by the National Mining Association (NMA) regarding radon fluxes from water surfaces surfaces at uranium recovery operations are insignificant and approximate background soil fluxes for most

128

Montana Coal Mining Code (Montana)  

Broader source: Energy.gov [DOE]

The Department of Labor and Industry is authorized to adopt rules pertaining to safety standards for all coal mines in the state. The Code requires coal mine operators to make an accurate map or...

129

The Sudbury Mining District  

E-Print Network [OSTI]

for Digital Scholarship. http://kuscholarworks.ku.edu Submitted to the School of Engineering of the University of Kansas in partial fulfillment of the requirements for a course in Mining Engineering ran THE SUDBURY MINING DISTRICT. A D i s s e r t a t i o... n P r e s e n t e d t o the F a c u l t y o f the SCHOOL OP ENGINEERING i n the UNIVERSITY OP KANSAS. F o r the Completion o f a Course i n MINING ENGINEERING. fey Prank G. B e d e l l . June 1906. PREFACE• I n t h i s paper w i l l be g i...

Bedell, Frank G.

1906-06-01T23:59:59.000Z

130

An introduction—Mining geophysics  

Science Journals Connector (OSTI)

...occurrences related to mining operations have forced...Kentucky, in which coal refuse and slurry broke...potential problems ahead of mining operations and minimize...resistivity to map shallow coal mine workings in the Appalachia coal fields. High-resolution...

Lawrence M. Gochioco; Milovan Urosevic

131

Equipment  

Science Journals Connector (OSTI)

...circuit can be included which will return the system to its previous state when power has been restored after a power failure. (Panellit, Inc., Dept. 197) * AUXILIARY RECORKFR may be used with the manufacturer's infrared spectropho-tometers to provide...

JOSHUA STERN

1958-08-01T23:59:59.000Z

132

Covered Product Category: Imaging Equipment  

Broader source: Energy.gov [DOE]

FEMP provides acquisition guidance and Federal efficiency requirements across a variety of product categories, including imaging equipment, which is covered by the ENERGY STAR® program. Federal laws and requirements mandate that agencies meet these efficiency requirements in all procurement and acquisition actions that are not specifically exempted by law.

133

Commercial Equipment Testing Enforcement Policies  

Broader source: Energy.gov [DOE]

In an exercise of its enforcement discretion, under specific conditions, DOE will not perform assessment testing, verification testing, or enforcement testing on units of certain types of commercial equipment if the manufacturer distributes in commerce an otherwise identical unit that does not have that feature.

134

ITP Mining: Energy and Environmental Profile of the U.S. Mining...  

Broader source: Energy.gov (indexed) [DOE]

Water Use in Industries of the Future: Mining Industry ITP Mining: Exploration and Mining Technology Roadmap Advanced Manufacturing Home Key Activities Research & Development...

135

Equipment Certification Requirements | Open Energy Information  

Open Energy Info (EERE)

Equipment Certification Requirements Equipment Certification Requirements Jump to: navigation, search Policies requiring renewable energy equipment to meet certain standards serve to protect consumers from buying inferior equipment. These requirements not only benefit consumers; they also protect the renewable energy industry by making it more difficult for substandard systems to reach the market. [1] Contents 1 Equipment Certification Incentives 2 References Equipment Certification Incentives CSV (rows 1 - 19) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active Canada Oil and Gas Operations Act (Canada) Environmental Regulations Equipment Certification Fees Generating Facility Rate-Making Generation Disclosure Industry Recruitment/Support Safety and Operational Guidelines

136

Laboratory Equipment & Supplies | Sample Preparation Laboratories  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Equipment & Supplies Equipment & Supplies John Bargar, SSRL Scientist Equipment is available to serve disciplines from biology to material science. All laboratories contain the following standard laboratory equipment: pH meters with standard buffers, analytical balances, microcentrifuges, vortex mixers, ultrasonic cleaning baths, magnetic stirrers, hot plates, and glassware. Most laboratories offer ice machines and cold rooms. Specialty storage areas for samples include a -80 freezer, argon and nitrogen glove boxes, radiation contamination areas, inert atmosphere chambers, and cold rooms. For specific information please see: Equipment Inventory Checkout Equipment & Supplies To view equipment inventory by laboratory, refer to the following pages: Biology Chemistry & Material Science Laboratory 1 Inventory

137

The Kelastic variable wall mining machine. Interim final report  

SciTech Connect (OSTI)

This machine cuts coal along a longwall face extending up to 500 feet by a rotating auger with bits. The machine also transports the coal that is cut acting as screw conveyor. By virtue of an integral shroud comprising part of the conveyor the machine is also amenable to a separation of the zones where men work from air being contaminated by dust and methane gas by the cutting action. Beginning as single intake air courses, the air separates at the working section where one split provides fresh air to the Occupied Zone (OZ) for human needs and the other split purges and carries away dust and methane from face fragmentation in the Cutting Zone (CZ). The attractiveness of the Variable Wall Mining Machine is that it addresses the limitations of current longwall mining equipment: it can consistently out-produce continuous mining machines and most longwall shearing machines. It also is amenable to configuring an environment, the dual-duct system, where the air for human breathing is separated from dust-laden ventilating air with methane mixtures. The objective of the research was to perform a mathematical and experimental study of the interrelationships of the components of the system so that a computer model could demonstrate the workings of the system in an animation program. The analysis resulted in the compilation of the parameters for three different configurations of a dual aircourse system of ventilating underground mines. In addressing the goal of an inherently safe mining system the dual-duct adaptation to the Variable Wall Mining Machine appears to offer the path to solution. The respirable dust problem is solvable; the explosive dust problem is nearly solvable; and the explosive methane problem can be greatly reduced. If installed in a highly gassy mine, the dual duct models would also be considerably less costly.

NONE

1995-11-12T23:59:59.000Z

138

An equipment manufacturer's perspective of acoustical standards  

Science Journals Connector (OSTI)

As an HVAC manufacturer it is our goal to create safe comfortable and efficient environments (i.e. classrooms health care facilities offices etc.). Standards are useful in gaining agreement regarding the appropriate sound levels for these spaces and establishing how to verify that these levels are met. Regular interaction and participation in writing the standards helps to ensure that all are aware of the requirements and it also allows participants to provide input on what is practical. Participating in the process also helps to prevent adversarial relations between the parties involved in the design and use of the equipment. Standards also provide the technical basis for which manufacturers and customers can make a valid comparison of different products. The information provided is useful in the design process. Sound power of the equipment is a commonly used metric. Standardizing sound powermeasurement methods reduces the customer's risk by making sure the published sound levels are representative of the equipment as it is intended and gives a defined expectation of repeatability. Thus participating in the standards process we help to ensure that the measurement methods are practical for the intended equipment.

Stephen J. Lind

2011-01-01T23:59:59.000Z

139

Saving energy in mining  

SciTech Connect (OSTI)

The struggle to reduce power costs is relentless in the world of mining. One of the most significant trends has been the use of electric instead of diesel power in such mining vehicles as large capacity dump trucks, hydraulic excavators, and articulated trucks. The hydraulic excavator, due to its selectivity, high breakout force, and maneuverability, has become increasingly popular as the loading unit in conventional shovel and truck operations. However, hydraulic shovels were originally only available as diesel powered units. Electric power for the prime mover is now offered as an option by most manufacturers. This is particularly cost effective with the larger machines. In surface mines, the transport of coal and overburden consumes the most energy. The application of such technology as in-pit crushers and conveyor systems are all aimed at reducing operating costs. A major development in reducing ventilation energy consumption is the Ventcon system based on the idea of distributing ventilation air more effectively around the mine. Ventcon controls the mine's fans and ventilation doors so that airflow is highest where most is required. The use of continuous haulage from the face to the surface is another energy-saving development. In many areas of Appalachia, United States, coal is cut by a continuous miner and hauled directly to the surface by a series of conveyors. The use of aluminum in cage and skip manufacturehas also been proven as an energy-saving technique. All-aluminum man cages are already in use. For the tougher application of hoisting coal, aluminum can be substituted for heavier materials in the construction of skips. In both cases, significant energy savings, and thus reduced hoisting costs, are the result. There is a power saving of more than 100 kilowatts (134 horsepower) for every one ton reduction of skip mass. The energy efficiencies of hydraulic rock drills are higher than pneumatic drills.

Chadwick, J.R.

1982-03-01T23:59:59.000Z

140

Bulk Hauling Equipment for CHG  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BULK HAULING EQUIPMENT FOR CHG BULK HAULING EQUIPMENT FOR CHG Don Baldwin Director of Product Development - Hexagon Lincoln HEXAGON LINCOLN TITAN(tm) Module System Compressed Hydrogen Gas * Capacity 250 bar - 616 kg 350 bar - 809 kg 540 bar - 1155 kg * Gross Vehicle Weight (with prime mover) 250 bar - 28 450 kg 350 bar - 30 820 kg 540 bar - 39 440 kg * Purchase Cost 250 bar - $510,000 350 bar - $633,750 540 bar - $1,100,000 Compressed Natural Gas * Capacity (250 bar at 15 C) - 7412 kg * GVW (With prime mover) - 35 250 kg * Purchase Cost (+/- 5%) - $510,000 HEXAGON LINCOLN TITAN(tm) V Magnum Trailer System Compressed Hydrogen Gas * Capacity 250 bar - 800 kg 350 bar - 1050 kg 540 bar - 1500 kg * Gross Vehicle Weight (with prime mover) 250 bar - 31 000 kg 350 bar - 34 200 kg 540 bar - 45 700 kg * Purchase Cost (+/-

Note: This page contains sample records for the topic "inputs mining equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

BASIS Equipment | ORNL Neutron Sciences  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Equipment Equipment BASIS Schematic Schematic of the SNS Backscattering Spectrometer. Helium dewer cooling a sample Helium dewer cooling a sample (bird's eye view). The heart of the work in a typical experiment is setting up the sample in the desired environment. A typical neutron sample ranging from a millimeter to a few centimeters is placed in a specialized cylindrical can and sealed. For liquids, the backscattering instrument often uses an annular can, created by placing a smaller can within a larger can and inserting the liquid sample between the two cans. This picture shows a helium dewer cooling the environment encompassing the sample can, which has been lowered into the beam from the top of the scattering tank. Crystals Crystals. The backscattering spectrometer is defined by the reflection of specific

142

Football facility and equipment management  

Science Journals Connector (OSTI)

The paper investigates the subject of football facility and equipment management to present the key success factors and planning elements for consideration. The work is based on secondary data analysis and literature review, and the findings include both descriptive and prescriptive elements. The findings construct a theoretical basis for further development and provide football managers with explicit and practical advice on the subject. They further indicate that topics pertaining to football facility and equipment management are not and should not be viewed as independent tasks under a common umbrella. They are all part of a larger system with all aspects interrelated both at the planning and the operation stages. Moreover, they are found to be inextricably linked with the wider strategic and marketing processes and constitute a significant part of the value proposition of the club to its immediate customers, implicit customers, industry associates and wider society.

Nicos L. Kartakoullis; Alkis Thrassou; Demetris Vrontis; Thanos Kriemadis

2013-01-01T23:59:59.000Z

143

Table 23. Coal Mining Productivity by State, Mine Type, and Mine Production Range, 2012  

U.S. Energy Information Administration (EIA) Indexed Site

Mining Productivity by State, Mine Type, and Mine Production Range, 2012 Mining Productivity by State, Mine Type, and Mine Production Range, 2012 (short tons produced per employee hour) U.S. Energy Information Administration | Annual Coal Report 2012 Table 23. Coal Mining Productivity by State, Mine Type, and Mine Production Range, 2012 (short tons produced per employee hour) U.S. Energy Information Administration | Annual Coal Report 2012 Mine Production Range (thousand short tons) Coal-Producing State, Region 1 and Mine Type Above 1,000 Above 500 to 1,000 Above 200 to 500 Above 100 to 200 Above 50 to 100 Above 10 to 50 10 or Under Total 2 Alabama 1.69 2.50 1.95 1.72 1.83 0.69 0.55 1.68 Underground 1.73 - - - 1.08 0.31 - 1.64 Surface 1.36 2.50 1.95 1.72 2.11 1.19 0.55 1.75 Alaska 5.98 - - - - - - 5.98 Surface 5.98 - - - - - - 5.98 Arizona 7.38 - - - - - - 7.38 Surface

144

Used energy-related laboratory equipment grant program for institutions of higher learning. Eligible equipment catalog  

SciTech Connect (OSTI)

This is a listing of energy related equipment available through the Energy-Related Laboratory Equipment Grant Program which grants used equipment to institutions of higher education for energy-related research. Information included is an overview of the program, how to apply for a grant of equipment, eligibility requirements, types of equipment available, and the costs for the institution.

Not Available

1994-07-01T23:59:59.000Z

145

Strategy Guideline: HVAC Equipment Sizing  

SciTech Connect (OSTI)

The heating, ventilation, and air conditioning (HVAC) system is arguably the most complex system installed in a house and is a substantial component of the total house energy use. A right-sized HVAC system will provide the desired occupant comfort and will run efficiently. This Strategy Guideline discusses the information needed to initially select the equipment for a properly designed HVAC system. Right-sizing of an HVAC system involves the selection of equipment and the design of the air distribution system to meet the accurate predicted heating and cooling loads of the house. Right-sizing the HVAC system begins with an accurate understanding of the heating and cooling loads on a space; however, a full HVAC design involves more than just the load estimate calculation - the load calculation is the first step of the iterative HVAC design procedure. This guide describes the equipment selection of a split system air conditioner and furnace for an example house in Chicago, IL as well as a heat pump system for an example house in Orlando, Florida. The required heating and cooling load information for the two example houses was developed in the Department of Energy Building America Strategy Guideline: Accurate Heating and Cooling Load Calculations.

Burdick, A.

2012-02-01T23:59:59.000Z

146

National Climate Assessment: Available Technical Inputs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Available Technical Inputs Print E-mail Available Technical Inputs Print E-mail Technical inputs for the 2013 National Climate Assessment were due March 1, 2012. Please note that these reports were submitted independently to the National Climate Assessment for consideration and have not been reviewed by the National Climate Assessment Development and Advisory Committee. Links to agency-sponsored reports will be posted here as they are made available. Sectors National Climate Assessment Health Sector Literature Review and Bibliography. Technical Input for the Interagency Climate Change and Human Health Group, September 2012. Overview Bibliography Bibliography User's Guide Search Strategy and Results Walthall et al. 2012. Climate Change and Agriculture in the United States: Effects and Adaptation. USDA Technical Bulletin 1935. Washington, DC. 186 pages. | Report FAQs

147

Evaluation of boolean formulas with restricted inputs  

E-Print Network [OSTI]

In this thesis, I will investigate the running time of quantum algorithms for evaluating boolean functions when the input is promised to satisfy certain conditions. The two quantum algorithms considered in this paper are ...

Zhan, Bohua

2010-01-01T23:59:59.000Z

148

Generation of RTL verification input stimulus  

E-Print Network [OSTI]

This thesis presents an approach for generating input stimulus for verification of register-transfer level (RTL) design of VLSI circuits. RTL design is often subjected to a significant verification effort due to errors introduced during manual...

Selvarathinam, Anand Manivannan

2012-06-07T23:59:59.000Z

149

Biodiesel Clears the Air in Underground Mines, Clean Cities, Fact Sheet, June 2009  

SciTech Connect (OSTI)

Mining companies are using biodiesel in their equipment to help clear the air of diesel particulate matter (DPM). This action improves air quality and protects miners' lungs. Though using biodiesel has some challenges in cold weather, tax incentives, and health benefits make it a viable option.

Not Available

2009-06-01T23:59:59.000Z

150

Appliances and Commercial Equipment Standards  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Commercial and Industrial Pumps Energy Conservation Standards Commercial and Industrial Pumps Energy Conservation Standards Sign up for e-mail updates on regulations for this and other products The Department of Energy (DOE) is considering developing test procedures, labels, and energy conservation standards for commercial and industrial pumps. Pumps exist in numerous applications, including agriculture, oil and gas production, water and wastewater, manufacturing, mining, and commercial building systems. There are currently no federal standards or test procedures for commercial and industrial pumps. Recent Updates | Public Meeting Information | Submitting Public Comments | Milestones and Documents | Related Rulemakings | Statutory Authority | Contact Information Recent Updates DOE published a notice of public meeting and availability of the framework document regarding commercial and industrial pumps. 78 FR 7304 (February 1, 2013).

151

ITP Mining: Mining Industry of the Future Mineral Processing...  

Broader source: Energy.gov (indexed) [DOE]

and activities in the industry and crossed various mined commodities including copper, uranium, iron ore, coal and others. The workshop participants included individuals from...

152

LER Data Mining Pilot Study Final Report  

SciTech Connect (OSTI)

LERs consist of a one page standard form with a standard header and free text data, followed by additional continuation pages of free text data. Currently this LER data is analyzed by first inputting the heading and text data manually into a categorical relational database. The data is then evaluated by enumeration of data in various categories and supplemented by review of individual LERs. This is labor intensive and makes it difficult to relate specific descriptive text to enumerated results. State of the art data mining and visualization technology exists that can eliminate the need for manual categorization, maintain the text relationships within each report, produce the same enumerated results currently available, and provide a tool to support potentially useful additional analysis of the informational content of LERs in a more timely and cost effective manner.

Young, Jonathan; Zentner, Michael D.; McQuerry, Dennis L.

2004-10-15T23:59:59.000Z

153

Low glare luminaire for thin seam mining. Open file report 29 Sep 78-28 Feb 82  

SciTech Connect (OSTI)

Work places of an underground coal mine are required (30 CFR 1719) to be illuminated while self-propelled equipment is used. Permissible machine-mounted systems have been developed and applied satisfactorily to many mining operations. However, some low-seam and thin-seam equipment has been difficult to illuminate because reliable, direct current (dc) systems and compact, low output, low-glare luminaires were not available. This program resulted in the design and prototype construction of compact, low-glare luminaires and alternate current (ac) power systems, particularly suited to resolving illumination problems on low- and thin-seam mining equipment. Design objectives were based on enhancing the prospects for thin-seam illumination solutions through definition of a product that could challenge markets enjoyed by higher glare luminaires and through reduction of technical risks associated with any new product development as well as the MSHA certification process.

Parker, J.R.; Hahn, W.F.

1982-10-01T23:59:59.000Z

154

Equipment Design and Cost Estimation for Small Modular Biomass Systems, Synthesis Gas Cleanup, and Oxygen Separation Equipment; Task 2.3: Sulfur Primer  

SciTech Connect (OSTI)

This deliverable is Subtask 2.3 of Task 2, Gas Cleanup Design and Cost Estimates, of NREL Award ACO-5-44027, ''Equipment Design and Cost Estimation for Small Modular Biomass Systems, Synthesis Gas Cleanup and Oxygen Separation Equipment''. Subtask 2.3 builds upon the sulfur removal information first presented in Subtask 2.1, Gas Cleanup Technologies for Biomass Gasification by adding additional information on the commercial applications, manufacturers, environmental footprint, and technical specifications for sulfur removal technologies. The data was obtained from Nexant's experience, input from GTI and other vendors, past and current facility data, and existing literature.

Nexant Inc.

2006-05-01T23:59:59.000Z

155

Abatement of Air Pollution: Air Pollution Control Equipment and Monitoring Equipment Operation (Connecticut)  

Broader source: Energy.gov [DOE]

These regulations contain instructions for the operation and monitoring of air pollution control equipment, as well as comments on procedures in the event of equipment breakdown, failure, and...

156

Laboratory Equipment Donation Program - Application Process  

Office of Scientific and Technical Information (OSTI)

Equipment listings on the LEDP web site are obtained from the U.S. General Equipment listings on the LEDP web site are obtained from the U.S. General Services Administration (GSA) Energy Asset Disposal System (EADS). Once equipment is listed, EADS allows 30 days for grantees from eligible institutions to apply for it on the LEDP site. Equipment Condition Codes are found near the top of the "LEDP Equipment Information" page for each item. The condition of equipment is graded as follows: 1: Unused Good Condition 4: Used Good Condition 7: Repairable Requires Repairs X: Salvage Salvage S: Scrap Scrap Specific questions concerning equipment should be directed to the point of contact responsible for the item(s) under consideration. This information is listed on the "Equipment Information" page, as well as on the grant

157

INL Equipment to Aid Regional Response Team  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

INL Equipment to Aid Regional Response Team DOE-ID is transferring equipment to the Idaho Falls Police Department's Hazardous Materials Response Team for their use in responding to...

158

Operations and Maintenance for Major Equipment Types  

Broader source: Energy.gov [DOE]

Equipment lies at the heart of all operations and maintenance (O&M) activities. This equipment varies greatly across the Federal sector in age, size, type, model, condition, etc.

159

Dental CBCT equipment and performance issues  

Science Journals Connector (OSTI)

......time due to insufficient dose audit data. For dental CBCT equipment...there are no large-scale audits of equipment in clinical use...http://ec.europa.eu/energy/nuclear/radiation_protection...http://ec.europa.eu/energy/nuclear/radioprotection......

K. Horner; R. Jacobs; R. Schulze

2013-02-01T23:59:59.000Z

160

Consider Steam Turbine Drives for Rotating Equipment  

Broader source: Energy.gov [DOE]

This tip sheet outlines the benefits of steam turbine drives for rotating equipment as part of optimized steam systems.

Note: This page contains sample records for the topic "inputs mining equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Proceedings: Tenth EPRI Substation Equipment Diagnostics Conference  

SciTech Connect (OSTI)

Advanced monitoring and diagnostic sensors and systems are needed to provide reliable and accurate information for determining the condition of major transmission substation equipment. The tenth EPRI Substation Equipment Diagnostics Conference highlighted the work of researchers, universities, manufacturers, and utilities in producing advanced monitoring and diagnostic equipment for substations.

None

2002-06-01T23:59:59.000Z

162

Proceedings: Substation Equipment Diagnostics Conference IX  

SciTech Connect (OSTI)

Advanced monitoring and diagnostic sensors and systems are needed to provide reliable and accurate information for determining the condition of major transmission substation equipment. The ninth EPRI Substation Equipment Diagnostics Conference highlighted the work of researchers, universities, manufacturers, and utilities in producing advanced monitoring and diagnostic equipment for substations.

None

2001-09-01T23:59:59.000Z

163

Proceedings: Substation Equipment Diagnostics Conference VIII  

SciTech Connect (OSTI)

Advanced monitoring and diagnostic sensors and systems are needed to provide reliable and accurate information for determining the condition of major transmission substation equipment. The eighth EPRI Substation Equipment Diagnostics Conference highlighted the work of researchers, universities, manufacturers, and utilities in producing advanced monitoring and diagnostic equipment for substations.

None

2000-06-01T23:59:59.000Z

164

Total Blender Net Input of Petroleum Products  

U.S. Energy Information Administration (EIA) Indexed Site

Input Input Product: Total Input Natural Gas Plant Liquids and Liquefied Refinery Gases Pentanes Plus Liquid Petroleum Gases Normal Butane Isobutane Other Liquids Oxygenates/Renewables Methyl Tertiary Butyl Ether (MTBE) Renewable Fuels (incl. Fuel Ethanol) Fuel Ethanol Renewable Diesel Fuel Other Renewable Fuels Unfinished Oils (net) Unfinished Oils, Naphthas and Lighter Unfinished Oils, Kerosene and Light Gas Oils Unfinished Oils, Heavy Gas Oils Residuum Motor Gasoline Blending Components (MGBC) (net) MGBC - Reformulated MGBC - Reformulated - RBOB MGBC - Reformulated, RBOB for Blending w/ Alcohol MGBC - Reformulated, RBOB for Blending w/ Ether MGBC - Reformulated, GTAB MGBC - Conventional MGBC - Conventional, CBOB MGBC - Conventional, GTAB MGBC - Other Conventional Period-Unit: Monthly-Thousand Barrels Monthly-Thousand Barrels per Day Annual-Thousand Barrels Annual-Thousand Barrels per Day

165

Opportunities for Public Input Into DOE Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Opportunities for Public Input Into DOE Projects Opportunities for Public Input Into DOE Projects There are currently several DOE-proposed activities that citizens can comment on in the near future. Here is a summary of each, as well as a description of how to provide your input into the project: Hanford Draft Closure and Waste Management Environmental Impact Statement Idahoans might be interested in this document because one of the proposed actions involves sending a small amount of radioactive waste (approximately 5 cubic meters of special reactor components) to the Idaho Nuclear Technology and Engineering Center on DOE's Idaho Site for treatment. Here is a link to more information about the document: http://www.hanford.gov . A public hearing on the draft EIS will be held in Boise on Tuesday, Feb. 2 at the Owyhee Plaza Hotel. It begins at 6 p.m.

166

An experimental investigation of mine burial penetration in soft sediments  

E-Print Network [OSTI]

of that of actual mines. The factors selected for the investigation were mine weight, preburial condition of the mine, mine orientation, impact velocity of the mine and shear strength and creep characteristics of the soil. Only the geotechnical aspects...

Munim, Mohammed Abdul

2012-06-07T23:59:59.000Z

167

Proceedings, 26th international conference on ground control in mining  

SciTech Connect (OSTI)

Papers are presented under the following topic headings: multiple-seam mining, surface subsidence, coal pillar, bunker and roadway/entry supports, mine design and highwall mining, longwall, roof bolting, stone and hardrock mining, rock mechanics and mine seal.

Peng, S.S.; Mark, C.; Finfinger, G. (and others) (eds.)

2007-07-01T23:59:59.000Z

168

Insider Threat Detection using Stream Mining and Graph Mining  

E-Print Network [OSTI]

Insider Threat Detection using Stream Mining and Graph Mining Pallabi Parveen, Jonathan Evans threats who attempt to conceal their activities by varying their behaviors over time. This paper applies of insider threat detection, demonstrating that the ensemble-based approach is significantly more effective

Hamlen, Kevin W.

169

Mines and Quarries: The Coal Mines (Firedamp Drainage) Regulations, 1960   

E-Print Network [OSTI]

These regulations, which are made by the Minister of Power under section 141 of the Mines and Quarries Act, 1954, apply to the collecting of firedamp in coal mines before it has been diluted by any ventilation therein and its safe disposal (this...

Wood, Richard

1960-01-01T23:59:59.000Z

170

Solar Equipment Certification | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Solar Equipment Certification Solar Equipment Certification Solar Equipment Certification < Back Eligibility Construction General Public/Consumer Savings Category Solar Buying & Making Electricity Heating & Cooling Water Heating Program Info State Florida Program Type Equipment Certification Provider Florida Solar Energy Center Under the Solar Energy Standards Act of 1976, the Florida Solar Energy Center (FSEC) is responsible for certifying all solar equipment sold in Florida. A manufacturer who wishes to have their solar equipment certified first contacts FSEC for an application and requests that FSEC test samples of the product at random. Equipment is then subjected to a series of tests in order to be approved or denied certification. Standards and applications procedures for specific technologies are available on the FSEC web site.

171

Laboratory Equipment Donation Program - Contact Us  

Office of Scientific and Technical Information (OSTI)

End of Year Reports End of Year Reports At the end of the first year of using LEDP grant equipment, the grantee must provide DOE with a report on the use of the equipment. If a grantee does not submit a report, the DOE OPMO who approved the grant application can pull the equipment back, or not allow that institution to apply for more equipment. The report should describe: Any new courses instituted as a result of the grant of the equipment; Existing courses which have been expanded as a result of the grant of the equipment; Research activities, e.g., thesis titles, journals articles, sponsored research, etc.; and Other ways the equipment has been used to enhance courses, e.g., experiments, demonstrations, etc. If your item control Number starts with Send your report to 890565

172

Appliances and Commercial Equipment Standards  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Commercial and Industrial Compressors Determination Commercial and Industrial Compressors Determination Sign up for e-mail updates on regulations for this and other products The Department of Energy (DOE) proposes to determine that commercial and industrial compressors meet the criteria for covered equipment under Part A-1 of Title III of the Energy Policy and Conservation Act (EPCA), as amended. Recent Updates | Public Meeting Information | Submitting Public Comments | Milestones and Documents | Related Rulemakings | Statutory Authority | Contact Information Recent Updates DOE published a Proposed Coverage Determination concerning commercial and industrial compressors. 77 FR 76972 (Dec. 31, 2012). Public Meeting Information No public meeting is scheduled at this time. Submitting Public Comments The comment period is closed.

173

Appliances and Commercial Equipment Standards  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Alternative Efficiency Determination Methods and Alternate Rating Methods Alternative Efficiency Determination Methods and Alternate Rating Methods Sign up for e-mail updates on regulations for this and other products The Department of Energy (DOE) is proposing to revise and expand its existing regulations governing the use of alternative efficiency determination methods (AEDM) and alternate rating methods (ARM) for covered products as alternatives to testing for the purpose of certifying compliance. Recent Updates | Public Meeting Information | Submitting Public Comments | Milestones and Documents | Related Rulemakings | Statutory Authority | Contact Information Recent Updates DOE published a final rule revising its existing regulations governing the use of particular methods as alternatives to testing for commercial heating, ventilating, air conditioning, water heating, and refrigeration equipment. 78 FR 79579 (December 31, 2013).

174

Appliances and Commercial Equipment Standards  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Illuminated Exit Signs Illuminated Exit Signs Sign up for e-mail updates on regulations for this and other products The Department of Energy (DOE) has regulated the energy efficiency level of illuminated exit signs since 2005. Illuminated exit signs are used to indicate exit doors in schools, hospitals, libraries, government buildings, and commercial buildings of all kinds, including offices, restaurants, stores, auditoriums, stadiums, and movie theatres. Recent Updates | Standards | Test Procedures | Waiver, Exception, and Exemption Information | Statutory Authority | Historical Information | Contact Information Recent Updates There are no recent updates for this equipment. Standards for Illuminated Exit Signs The following content summarizes the energy conservation standards for illuminated exit signs. The text is not an official reproduction of the Code of Federal Regulations and should not be used for legal research or citation.

175

Appliance and Equipment Standards Program  

Broader source: Energy.gov [DOE]

The Building Technologies Office (BTO) implements minimum energy conservation standards for more than 50 categories of appliances and equipment. As a result of these standards, energy users saved about $55 billion on their utility bills in 2013. Since the beginning of 2009, 25 new or updated standards have been issued, which will help increase annual savings by more than 50 percent over the next decade. By 2030, cumulative operating cost savings from all standards in effect since 1987 will reach over $1.7 trillion, with a cumulative reduction of 6.8 billion tons of carbon dioxide emissions, equivalent to the annual greenhouse gas emissions of 1.4 billion automobiles. Products covered by standards represent about 90% of home energy use, 60% of commercial building use, and 29% of industrial energy us

176

Web Mining: Research and Practice  

Science Journals Connector (OSTI)

Web mining techniques seek to extract knowledge from Web data. This article provides an overview of past and current work in the three main areas of Web mining research—content structure and usage—as well as emerging work in Semantic Webmining.

Pranam Kolari; Anupam Joshi

2004-01-01T23:59:59.000Z

177

Solar for Mining Hugh Rudnick  

E-Print Network [OSTI]

the storage requirement to increase its participation worldwide #12;Solar Energy in Mining · Electrical Energy footprint · Electrowinning Heating on electrowinning process · Non-Metallic Mining Heating on nitrate Desalinization process Pumping Water treatment · Heating Water heating Space heating Space cooling #12;Ref

Catholic University of Chile (Universidad CatĂłlica de Chile)

178

Data Mining Tools Irfan Altas  

E-Print Network [OSTI]

Data Mining Tools Irfan Altas School of Information Studies, Charles Sturt University Wagga Wagga discuss several scalable and parallel discovery and predictive data mining tools. They successfully address many of the computational challenges associated with the analy­ sis of data sets with millions

Turlach, Berwin A.

179

Watfactory Virtual Manufacturing Process Varying Inputs  

E-Print Network [OSTI]

with the virtual process: · Allows quick exploration (i.e. during a short course) of process improvement ideasWatfactory Virtual Manufacturing Process Machine 1 Machine 2 Machine 3 Stream 1 Machine B Stream 2 Inputs Can be Set by Stream z19, ..., z24 The Watfactory virtual process simulates a manufacturing

Zhu, Mu

180

Automatic interpretation of loosely encoded input  

Science Journals Connector (OSTI)

Knowledge-based systems are often brittle when given unanticipated input, i.e. assertions or queries that misalign with the ontology of the knowledge base. We call such misalignments ''loose speak''. We found that loose speak occurs frequently in interactions ... Keywords: Knowledge based systems, Metonymy, Noun compound, Question answering

James Fan; Ken Barker; Bruce Porter

2009-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "inputs mining equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

U.S. Weekly Inputs & Utilization  

U.S. Energy Information Administration (EIA) Indexed Site

Utilization 95.4 93.5 93.5 94.4 93.9 91 1990-2015 Refiner and Blender Net Inputs Motor Gasoline Blending Components 8 234 445 192 -558 -219 2004-2015 RBOB 167 330 371 103 9 261...

182

Contractive Systems with Inputs Eduardo D. Sontag  

E-Print Network [OSTI]

Contractive Systems with Inputs Eduardo D. Sontag Dedicated to Y. Yamamoto on the occasion of his 60th birthday Abstract. Contraction theory provides an elegant way of analyzing the behaviors-contained introduction to some basic results, with a focus on contractions with respect to non-Euclidean metrics. 1

Sontag, Eduardo

183

Green Computing input for better outcomes  

E-Print Network [OSTI]

Journal Profile: Udi Dahan Green Maturity Model for Virtualization Profiling Energy Usage for Efficient suggests that tracking energy consumption at every level will become the factor of success for greenGreen Computing input for better outcomes Learn the discipline, pursue the art, and contribute

Amir, Yair

184

Input to Priorities Panel August 7, 2012  

E-Print Network [OSTI]

Input to Priorities Panel August 7, 2012 Jeff Freidberg MIT 1 #12;The Emperor of Fusion has · Comparison (1 GW overnight cost) · Coal $ 3B · Gas $ 1B · Nuclear $ 4B · Wind $ 2B · Solar-T $ 3B · ITER $25B

185

Dale Meade regarding input international collaboration panel  

E-Print Network [OSTI]

Dale Meade regarding input international collaboration panel 1 message Saskia to add 2 comments to this discussion: 1. This regards not only international collaborations, but also national collaborations. We need to decide on using 1 video conferencing system. One of the main

186

T-623: HP Business Availability Center Input Validation Hole...  

Broader source: Energy.gov (indexed) [DOE]

Business Availability Center Input Validation Hole Permits Cross-Site Scripting Attacks T-623: HP Business Availability Center Input Validation Hole Permits Cross-Site Scripting...

187

Tribal Leaders Provide White House with Input on Bolstering Climate...  

Energy Savers [EERE]

Tribal Leaders Provide White House with Input on Bolstering Climate Resilience Tribal Leaders Provide White House with Input on Bolstering Climate Resilience January 7, 2015 -...

188

U-252: Barracuda Web Filter Input Validation Flaws Permit Cross...  

Broader source: Energy.gov (indexed) [DOE]

2: Barracuda Web Filter Input Validation Flaws Permit Cross-Site Scripting Attacks U-252: Barracuda Web Filter Input Validation Flaws Permit Cross-Site Scripting Attacks September...

189

U-219: Symantec Web Gateway Input Validation Flaws Lets Remote...  

Broader source: Energy.gov (indexed) [DOE]

9: Symantec Web Gateway Input Validation Flaws Lets Remote Users Inject SQL Commands, Execute Arbitrary Commands, and Change User Passwords U-219: Symantec Web Gateway Input...

190

Early Markets: Fuel Cells for Material Handling Equipment | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Material Handling Equipment Early Markets: Fuel Cells for Material Handling Equipment This fact sheet describes the use of hydrogen fuel cells to power material handling equipment...

191

Step 5b: Help Program Contractors Obtain the Necessary Equipment...  

Broader source: Energy.gov (indexed) [DOE]

b: Help Program Contractors Obtain the Necessary Equipment Step 5b: Help Program Contractors Obtain the Necessary Equipment In addition to equipment for installing energy...

192

Operations and Maintenance for Major Equipment Types | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Types Operations and Maintenance for Major Equipment Types Equipment lies at the heart of all operations and maintenance (O&M) activities. This equipment varies greatly...

193

From Data Mining to Knowledge Mining Kenneth A. Kaufman and Ryszard S. Michalski  

E-Print Network [OSTI]

From Data Mining to Knowledge Mining Kenneth A. Kaufman and Ryszard S. Michalski ABSTRACT In view learning, statistical data analysis, data mining, text mining, data visualization, pattern recognition, etc for an emerging research direction, called knowledge mining, by which we mean the derivation of high

Michalski, Ryszard S.

194

ZART: A Multifunctional Itemset Mining Algorithm  

E-Print Network [OSTI]

ZART: A Multifunctional Itemset Mining Algorithm Laszlo Szathmary1 , Amedeo Napoli1 , and Sergei O independent, multi-purposed data mining platform, incorporating a rich collection of data mining algorithms. One of these algorithms is a multifunctional itemset mining algorithm called Zart, which is based

Boyer, Edmond

195

On the efficiency of electrical submersible pumps equipped with variable frequency drives: A field study  

SciTech Connect (OSTI)

A field study was conducted on 18 electrical-submersible-pump- (ESP-) equipped wells operating in the Williston basin. Fifteen of these wells were run with variable frequency drives (VFD`s). The purpose of the study was to determine the efficiency and operating characteristics of ESP`s operating with VFD`s and compare them to those without. Voltage, current, power, and frequency were measured at the drive input, the drive output, and ESP input. Production data were recorded and power and efficiency were calculated at all measurement locations and compared to published data.

Patterson, M.M. [Patterson (Maurice M.), Hemphill, TX (United States)

1996-02-01T23:59:59.000Z

196

Better Buildings Alliance Equipment Performance Specifications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BBA Equipment Performance BBA Equipment Performance Specifications William Goetzler Navigant Consulting william.goetzler@navigant.com (781) 270 8351 April 4, 2013 Better Buildings Alliance BTO Program Review 2 | Building Technologies Office eere.energy.gov Project Overview The BBA Performance Specifications project provides information and tools to help BBA members and other commercial building owners/operators specify and purchase high efficiency equipment. - Ensures targeted technologies are of interest to end users and manufacturers

197

Better Buildings Alliance Equipment Performance Specifications  

Broader source: Energy.gov (indexed) [DOE]

BBA Equipment Performance BBA Equipment Performance Specifications William Goetzler Navigant Consulting william.goetzler@navigant.com (781) 270 8351 April 4, 2013 Better Buildings Alliance BTO Program Review 2 | Building Technologies Office eere.energy.gov Project Overview The BBA Performance Specifications project provides information and tools to help BBA members and other commercial building owners/operators specify and purchase high efficiency equipment. - Ensures targeted technologies are of interest to end users and manufacturers

198

Application of computer voice input/output  

SciTech Connect (OSTI)

The advent of microprocessors and other large-scale integration (LSI) circuits is making voice input and output for computers and instruments practical; specialized LSI chips for speech processing are appearing on the market. Voice can be used to input data or to issue instrument commands; this allows the operator to engage in other tasks, move about, and to use standard data entry systems. Voice synthesizers can generate audible, easily understood instructions. Using voice characteristics, a control system can verify speaker identity for security purposes. Two simple voice-controlled systems have been designed at Los Alamos for nuclear safeguards applicaations. Each can easily be expanded as time allows. The first system is for instrument control that accepts voice commands and issues audible operator prompts. The second system is for access control. The speaker's voice is used to verify his identity and to actuate external devices.

Ford, W.; Shirk, D.G.

1981-01-01T23:59:59.000Z

199

Generalized Input-Output Inequality Systems  

SciTech Connect (OSTI)

In this paper two types of generalized Leontief input-output inequality systems are introduced. The minimax properties for a class of functions associated with the inequalities are studied. Sufficient and necessary conditions for the inequality systems to have solutions are obtained in terms of the minimax value. Stability analysis for the solution set is provided in terms of upper semi-continuity and hemi-continuity of set-valued maps.

Liu Yingfan [Department of Mathematics, Nanjing University of Post and Telecommunications, Nanjing 210009 (China)], E-mail: yingfanliu@hotmail.com; Zhang Qinghong [Department of Mathematics and Computer Science, Northern Michigan University, Marquette, MI 49855 (United States)], E-mail: qzhang@nmu.edu

2006-09-15T23:59:59.000Z

200

Solar Equipment Certification | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Solar Equipment Certification Solar Equipment Certification Solar Equipment Certification < Back Eligibility Commercial Construction Installer/Contractor Residential Savings Category Heating & Cooling Commercial Heating & Cooling Solar Heating Water Heating Program Info State Minnesota Program Type Equipment Certification Provider Minnesota Department of Commerce Minnesota law requires that all active solar space-heating and water-heating systems, sold, offered for sale, or installed on residential and commercial buildings in the state meet Solar Rating and Certification Corporation (SRCC) standards. Specifically, the rule references SRCC's "Operating Guidelines" pertaining to collector certification and system certification: OG-100 and OG-300, respectively. Local building officials

Note: This page contains sample records for the topic "inputs mining equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

G129 S129 Equipment List Windbreaker  

E-Print Network [OSTI]

(optional) Water shoes (tevas or old tennis shoes) Gaitors (optional) COURSE EQUIPMENT*: Pocket or wrist operated) Bug Spray Deck of cards, musical instrument, Frisbee, etc (optional) * Textbooks should

Polly, David

202

PPP Equipment Corporation | Open Energy Information  

Open Energy Info (EERE)

Name: PPP Equipment Corporation Sector: Solar Product: PPP-E designs, produces and markets Chemical Vapor Deposition (CVD) reactors and converter systems producing high-purity...

203

Healthcare Energy: Spotlight on Medical Equipment  

Broader source: Energy.gov [DOE]

The Building Technologies Office conducted a healthcare energy end-use monitoring project for two sites. Read details about large medical imaging equipment energy results.

204

Best Management Practice #11: Commercial Kitchen Equipment |...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

savings. Water-using commercial kitchen equipment include pre-rinse spray valves, wash tanks and sinks, commercial dishwashers, food steamers, steam kettles, commercial ice...

205

Equips Nucleares SA | Open Energy Information  

Open Energy Info (EERE)

SA Place: Madrid, Spain Zip: 28006 Sector: Services Product: ENSA is a Spanish nuclear components and nuclear services supply company. References: Equips Nucleares, SA1...

206

MOV surge arresters: improved substation equipment protection  

SciTech Connect (OSTI)

The introduction of metal-oxide-varistor (MOV) surge arresters has added a new dimension to substation equipment protection. Through the optimal use of these arresters, it is possible to lower surge arrester ratings and thereby improve protective margins, resulting in a possible reduction of the insulation levels (BIL) of substation equipment. This reduction in BIL can lead to a significant reduction in the cost of substation equipment. General methods are delineated for selecting MOV surge arresters for substation protection and the resulting effect on substation equipment insulation levels.

Niebuhr, W.D.

1985-07-01T23:59:59.000Z

207

Reduce Radiation Losses from Heating Equipment  

Broader source: Energy.gov [DOE]

This tip sheet describes how to save process heating energy and costs by reducing expensive heat losses from industrial heating equipment, such as furnaces.

208

WEAR RESISTANT ALLOYS FOR COAL HANDLING EQUIPMENT  

E-Print Network [OSTI]

Proceedings of the Conference on Coal Feeding Systems, HeldWear Resistant Alloys for Coal Handling Equipment", proposalWear Resistant Alloys for Coal Handling Equi pment". The

Bhat, M.S.

2011-01-01T23:59:59.000Z

209

Computers, Electronics and Electrical Equipment (2010 MECS) ...  

Energy Savers [EERE]

Electronics and Electrical Equipment More Documents & Publications MECS 2006 - Computer, Electronics and Appliances Cement (2010 MECS) Glass and Glass Products (2010 MECS)...

210

Two and three dimensional analysis of a slope failure in a lignite mine  

Science Journals Connector (OSTI)

With about 9.3 billion tons of reserve, lignite is a major source for energy production in Turkey. The Af?in–Elbistan lignite basin, containing 47% of the overall lignite reserve in Turkey, lies in the Af?in and Elbistan districts as a part of Kahramanmara?. The new Çöllolar opencast mine is in the Afsin–Elbistan lignite basin, and this mine will be the second mining activity in the basin after the active K??laköy opencast mine. The new mine will meet the coal consumption of the Elbistan B power plant. Input parameters for slope stability analysis are essential, and so they must be determined accurately and precisely. Field investigations, laboratory testing and back analyses are vital instruments for the input parameters. This study presents the results of slope stability analysis via finite difference code and a limit equilibrium software for the soil slopes of the Elbistan–Çöllolar lignite mine. The basic input parameters, cohesion and friction angle, were determined in the soil mechanics laboratory. By back analyses of a large scale slope failure, mobilized friction angles for a critical weak clay layer under the lignite seam were determined accurately by using the 2D limit equilibrium method and 3D finite difference models. Results of the friction angles were compared in order to check the effectiveness of commonly used 2D approaches in handling the slope problems. Differences in the results of the mobilized friction angles for the weak clay layer were more than 30%. The 3D models indicated that the mobilized friction angle during the major slope failure was substantially lower than the friction angle generated by the 2D limit equilibrium method.

Levent Tutluoglu; Ibrahim Ferid Öge; Celal Karpuz

2011-01-01T23:59:59.000Z

211

Performance evaluation of the quarter-scale Russian retrieval equipment for the removal of hazardous waste  

SciTech Connect (OSTI)

This report describes the test program for evaluating the Russian Retrieval Equipment fabricated by the Integrated Mining Chemical Company (IMCC) and delivered to the US by Radiochem Services Company (RCSC), both of Russia. The testing and fabrication of this equipment were sponsored by the US Department of Energy (DOE). The tests described in this report were conducted at the Pacific Northwest National Laboratory (PNNL) at the DOE Hanford Site by the Retrieval Process Development and Enhancement (RPD and E) team of the Tank Focus Area program (TFA). Tests were carried out jointly by Russian and US personnel for the purpose of evaluating the Russian Retrieval Equipment for potential deployment within the DOE complex. Section 1.0 of this report presents the objectives and a brief background for the test program. The Russian Equipment is described in Section 2.0. Section 3.0 describes the approach taken for testing the equipment. The results of the tests and an analysis of the data are described in Section 4.0. The results and observations obtained from the tests are discussed in Section 5.0. Recommendations and conclusions are presented in Section 6.0.

Enderlin, C.W.; Mullen, O.D.; Terrones, G.

1997-09-01T23:59:59.000Z

212

INTEGRATED POWER GENERATION SYSTEMS FOR COAL MINE WASTE METHANE UTILIZATION  

SciTech Connect (OSTI)

An integrated system to utilize the waste coal mine methane (CMM) at the Federal No. 2 Coal Mine in West Virginia was designed and built. The system includes power generation, using internal combustion engines, along with gas processing equipment to upgrade sub-quality waste methane to pipeline quality standards. The power generation has a nominal capacity of 1,200 kw and the gas processing system can treat about 1 million cubic feet per day (1 MMCFD) of gas. The gas processing is based on the Northwest Fuel Development, Inc. (NW Fuel) proprietary continuous pressure swing adsorption (CPSA) process that can remove nitrogen from CMM streams. The two major components of the integrated system are synergistic. The byproduct gas stream from the gas processing equipment can be used as fuel for the power generating equipment. In return, the power generating equipment provides the nominal power requirements of the gas processing equipment. This Phase III effort followed Phase I, which was comprised of a feasibility study for the project, and Phase II, where the final design for the commercial-scale demonstration was completed. The fact that NW Fuel is desirous of continuing to operate the equipment on a commercial basis provides the validation for having advanced the project through all of these phases. The limitation experienced by the project during Phase III was that the CMM available to operate the CPSA system on a commercial basis was not of sufficiently high quality. NW Fuel's CPSA process is limited in its applicability, requiring a relatively high quality of gas as the feed to the process. The CPSA process was demonstrated during Phase III for a limited time, during which the processing capabilities met the expected results, but the process was never capable of providing pipeline quality gas from the available low quality CMM. The NW Fuel CPSA process is a low-cost ''polishing unit'' capable of removing a few percent nitrogen. It was never intended to process CMM streams containing high levels of nitrogen, as is now the case at the Federal No.2 Mine. Even lacking the CPSA pipeline delivery demonstration, the project was successful in laying the groundwork for future commercial applications of the integrated system. This operation can still provide a guide for other coal mines which need options for utilization of their methane resources. The designed system can be used as a complete template, or individual components of the system can be segregated and utilized separately at other mines. The use of the CMM not only provides an energy fuel from an otherwise wasted resource, but it also yields an environmental benefit by reducing greenhouse gas emissions. The methane has twenty times the greenhouse effect as compared to carbon dioxide, which the combustion of the methane generates. The net greenhouse gas emission mitigation is substantial.

Peet M. Soot; Dale R. Jesse; Michael E. Smith

2005-08-01T23:59:59.000Z

213

Mined Land Reclamation on DOE's Uranium Lease Tracts, Southwestern...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Mined Land Reclamation on DOE's Uranium Lease Tracts, Southwestern Colorado Mined Land Reclamation on DOE's Uranium Lease Tracts, Southwestern Colorado Mined Land Reclamation on...

214

Surface mine reclamation for wildlife  

SciTech Connect (OSTI)

This document presents a reclamation plan for use on surface coal mines in southern Appalachia. The plan has been implemented cooperatively by TVA and the FWS on a mine site in Campbell County, Tennessee. Included are suggestions for establishing groundcover and trees on the mine site, and for retaining surface water on mine sites. All techniques discussed are to benefit wildlife and to assist the operator in achieving bond release. Also included is a section on the costs of reclaiming the Campbell County study site to benefit forestry and wildlife. The costs of this project are compared to the costs of reclaiming a more traditional forestry (monoculture) option. The comparison showed the techniques at the study site to be less costly than those that would be associated with a forestry option. 11 references, 14 figures, 2 tables.

Not Available

1981-06-01T23:59:59.000Z

215

Coal Mining Reclamation (North Dakota)  

Broader source: Energy.gov [DOE]

The Reclamation Division of the Public Service Commission is tasked with administering the regulation of surface coal mining and reclamation. Specific regulations can be found in article 69-05.2 of...

216

Data mining for improving textbooks  

Science Journals Connector (OSTI)

We present our early explorations into developing a data mining based approach for enhancing the quality of textbooks. We describe a diagnostic tool to algorithmically identify deficient sections in textbooks. We also discuss techniques for algorithmically ...

Rakesh Agrawal; Sreenivas Gollapudi; Anitha Kannan; Krishnaram Kenthapadi

2012-05-01T23:59:59.000Z

217

Safeguarding Equipment and Protecting Employees from  

E-Print Network [OSTI]

Safeguarding Equipment and Protecting Employees from Amputations www.osha.gov Small Business Safety of Labor for Occupational Safety and Health #12;Safeguarding Equipment and Protecting Employees from Activities 9 Hazard Analysis 9 Controlling Amputation Hazards 9 Safeguarding Machinery 9 Primary Safeguarding

Colton, Jonathan S.

218

Electrical Equipment Inspection Program Electrical Safety  

E-Print Network [OSTI]

Electrical Equipment Inspection Program Electrical Safety SLAC-I-730-0A11A-001-R003 23 March 2005 Document Title: Electrical Equipment Inspection Program Original Publication Date: 19 January 2005 Revised Publication Date: 23 March 2005 (updated 29 November 2010) Department: Electrical Safety Document Number: SLAC

Wechsler, Risa H.

219

Office equipment energy use and trends  

SciTech Connect (OSTI)

Office information technologies are using an increasing amount of energy in commercial buildings. During recent forecasting hearings in California, the office equipment end use has been a major source of differences among forecasts of commercial sector energy use. Not only are there major differences in forecasted load growth resulting from the energy use of office equipment, but there are also differences in interpretations of historical and base-year estimates. Understanding office equipment energy use is particularly important because office equipment is widely believed to be the fastest growing electrical end use in the fastest growing sector. This report describes the development and application of a spreadsheet to estimate current and future energy use by office equipment. We define the term ``office equipment`` to mean information processing technologies used in buildings. The seven categories of office equipment relate to categories found in our analysis of utility surveys and industry sales reports. These seven categories of equipment are examined for eleven types of commercial buildings.

Piette, M.A.; Eto, J.H.; Harris, J.P.

1991-09-01T23:59:59.000Z

220

Office equipment energy use and trends  

SciTech Connect (OSTI)

Office information technologies are using an increasing amount of energy in commercial buildings. During recent forecasting hearings in California, the office equipment end use has been a major source of differences among forecasts of commercial sector energy use. Not only are there major differences in forecasted load growth resulting from the energy use of office equipment, but there are also differences in interpretations of historical and base-year estimates. Understanding office equipment energy use is particularly important because office equipment is widely believed to be the fastest growing electrical end use in the fastest growing sector. This report describes the development and application of a spreadsheet to estimate current and future energy use by office equipment. We define the term office equipment'' to mean information processing technologies used in buildings. The seven categories of office equipment relate to categories found in our analysis of utility surveys and industry sales reports. These seven categories of equipment are examined for eleven types of commercial buildings.

Piette, M.A.; Eto, J.H.; Harris, J.P.

1991-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "inputs mining equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

ITP Mining: Energy and Environmental Profile of the U.S. Mining Industry (December 2002)  

Office of Energy Efficiency and Renewable Energy (EERE)

The U.S. Department of Energy and the National Mining Association are working in partnership to implement the Mining Industry of the Future strategy.

222

Definition: Equipment Health Sensor | Open Energy Information  

Open Energy Info (EERE)

Sensor Sensor Jump to: navigation, search Dictionary.png Equipment Health Sensor Monitoring devices that automatically measure and communicate equipment characteristics that are related to the 'health' and maintenance of the equipment. These characteristics can include, but are not limited to temperature, dissolved gas, and loading. These devices can also automatically generate alarm signals if the equipment characteristics reach critical or dangerous levels.[1] Related Terms sustainability References ↑ [www.smartgrid.gov/sites/default/files/pdfs/description_of_assets.pdf SmartGrid.gov 'Description of Assets'] An LikeLike UnlikeLike You like this.Sign Up to see what your friends like. inline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Equipment_Health_Sensor&oldid=502526

223

Registration, Force Protection Equipment Demonstration - May 2009 |  

Broader source: Energy.gov (indexed) [DOE]

Registration, Force Protection Equipment Demonstration - May 2009 Registration, Force Protection Equipment Demonstration - May 2009 Registration, Force Protection Equipment Demonstration - May 2009 May 2009 Demonstrating commercially availale physical security/force protection soultions around the world The bombing of Khobar Towers in Saudi Arabia on 25 June 1996 revealed the need for continal vigilance and protection againist terrorist forces intent on harming US personnel and interests. The Chairman if the Joint Chiefs of Staff directed the Services to investigate COTS equipments solutions for physical security/force protection needs. The Office of the Under Secretary of Defense for Acquistion, Technology, and Logistics (OUSD {at&l}) tasked the Office of the US Army Product Manager, force Protection Systems (PM-FPS), to coordiante and facilitate a Force Protection Equipment

224

RMOTC - Field Information - Equipment and Facilities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Equipment & Facilities Equipment & Facilities Motor Grader at RMOTC Notice: As of July 15th 2013, the Department of Energy announced the intent to sell Naval Petroleum Reserve Number 3 (NPR3). The sale of NPR-3 will also include the sale of all equipment and materials onsite. A decision has been made by the Department of Energy to complete testing at RMOTC by July 1st, 2014. RMOTC will complete testing in the coming year with the currently scheduled testing partners. For more information on the sale of NPR-3 and sale of RMOTC equipment and materials please join our mailing list here. RMOTC's test facility has its own line of workover, support, and heavy equipment available for partner use on site. RMOTC can also offer its partners workspace on site in its Customer Operations Center which has

225

Office Buildings - End-Use Equipment  

U.S. Energy Information Administration (EIA) Indexed Site

End-Use Equipment End-Use Equipment The types of space heating equipment used in office buildings were similar to those of the commercial buildings sector as a whole (Table 8 and Figure 5). Furnaces were most used followed by packaged heating systems. Individual space heaters were third-most used but were primarily used to supplement the building's main heating system. Boilers and district heat systems were more often used in larger buildings. Table 8. Types of Heating Equipment Used in Office Buildings, 2003 Number of Buildings (thousand) Total Floorspace (million square feet) All Buildings* All Office Buildings All Buildings* All Office Buildings All Buildings 4,645 824 64,783 12,208 All Buildings with Space Heating 3,982 802 60,028 11,929 Heating Equipment (more than one may apply)

226

CVD Equipment Corp | Open Energy Information  

Open Energy Info (EERE)

CVD Equipment Corp CVD Equipment Corp Jump to: navigation, search Name CVD Equipment Corp Place Ronkonkoma, New York Zip 11779 Sector Solar Product New York-based maker of chemical vapour deposition process equipment. This equipment is used in the manufacture of solar and semiconductor fabrication. Coordinates 40.81122°, -73.098744° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.81122,"lon":-73.098744,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

227

Definition: Disturbance Monitoring Equipment | Open Energy Information  

Open Energy Info (EERE)

Disturbance Monitoring Equipment Disturbance Monitoring Equipment Jump to: navigation, search Dictionary.png Disturbance Monitoring Equipment Devices capable of monitoring and recording system data pertaining to a Disturbance. Such devices include the following categories of recorders: Sequence of event recorders which record equipment response to the event., Fault recorders, which record actual waveform data replicating the system primary voltages and currents. This may include protective relays., Dynamic Disturbance Recorders (DDRs), which record incidents that portray power system behavior during dynamic events such as low-frequency (0.1 Hz - 3 Hz) oscillations and abnormal frequency or voltage excursions. Phasor Measurement Units and any other equipment that meets the functional requirements of DMEs may qualify as DMEs.[1]

228

Laboratory Equipment Donation Program - About Us  

Office of Scientific and Technical Information (OSTI)

About LEDP About LEDP The Laboratory Equipment Donation Program (LEDP), formerly the Energy-Related Laboratory Equipment (ERLE) Grant Program, was established by the United States Department of Energy (DOE) to grant surplus and available used energy-related laboratory equipment to universities and colleges in the United States for use in energy oriented educational programs. This grant program is sponsored by the Office of Workforce Development for Teachers and Scientists (WDTS). The listing of equipment available through LEDP is updated as new equipment is identified. It is available at no cost for a limited time and is granted on a first-received qualified application basis. Specific items may be recalled for DOE use and become unavailable through the program after the

229

Experimental Equipment | Stanford Synchrotron Radiation Lightsource  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Equipment Equipment SSRL plans the distribution of its limited equipment on the basis of the information supplied on the Beam Time Request Form and the User Support Requirements Form. Please make sure to state all of your needs. Standard X-Ray Station Equipment Standard equipment to be found on an x-ray station includes: (1 ea.) Small and large ionization chambers (1) Exit slits (1) X-Y sample positioner (3) Keithly 427 current-to-voltage amplifier TEK 2215 60 MHZ 2 channel scope Voltage-to-frequency converter (3 channels) (1) Fluke high voltage power supply (1) Kinetic Systems hex scaler (1) Kinetic Systems up-down presettable counter (1) Ortec real-time clock (2) Joerger stepping motor controller DSP Micro VAX or Kinetic Systems G.I./CAMAC crate controller (1) Standard Engineering Corporation CAMAC power supply

230

Automatic monitoring of vibration welding equipment  

DOE Patents [OSTI]

A vibration welding system includes vibration welding equipment having a welding horn and anvil, a host device, a check station, and a robot. The robot moves the horn and anvil via an arm to the check station. Sensors, e.g., temperature sensors, are positioned with respect to the welding equipment. Additional sensors are positioned with respect to the check station, including a pressure-sensitive array. The host device, which monitors a condition of the welding equipment, measures signals via the sensors positioned with respect to the welding equipment when the horn is actively forming a weld. The robot moves the horn and anvil to the check station, activates the check station sensors at the check station, and determines a condition of the welding equipment by processing the received signals. Acoustic, force, temperature, displacement, amplitude, and/or attitude/gyroscopic sensors may be used.

Spicer, John Patrick; Chakraborty, Debejyo; Wincek, Michael Anthony; Wang, Hui; Abell, Jeffrey A; Bracey, Jennifer; Cai, Wayne W

2014-10-14T23:59:59.000Z

231

Universal null DTE (data terminal equipment)  

DOE Patents [OSTI]

A communication device in the form of data terminal equipment permits two data communication equipments, each having its own master clock and operating at substantially the same nominal clock rate, to communicate with each other in a multi-segment circuit configuration of a general communication network even when phase or frequency errors exist between the two clocks. Data transmitted between communication equipments of two segments of the communication network is buffered. A variable buffer fill circuit is provided to fill the buffer to a selectable extent prior to initiation of data output clocking. Selection switches are provided to select the degree of buffer preload. A dynamic buffer fill circuit may be incorporated for automatically selecting the buffer fill level as a function of the difference in clock frequencies of the two equipments. Controllable alarm circuitry is provided for selectively generating an underflow or an overflow alarm to one or both of the communicating equipments. 5 figs.

George, M.; Pierson, L.G.; Wilkins, M.E.

1987-11-09T23:59:59.000Z

232

Definition: Equipment Condition Monitor | Open Energy Information  

Open Energy Info (EERE)

Condition Monitor Condition Monitor Jump to: navigation, search Dictionary.png Equipment Condition Monitor A monitoring device that automatically measures and communicates equipment characteristics that are related to the "health" and maintenance of the equipment. These characteristics can include, but are not limited to temperature, dissolved gas, and loading. These devices can automatically generate alarm signals if conditions exceed preset thresholds.[1] Related Terms sustainability References ↑ https://www.smartgrid.gov/category/technology/equipment_condition_monitor [[C LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ategory: Smart Grid Definitions|Template:BASEPAGENAME]] Retrieved from "http://en.openei.org/w/index.php?title=Definition:Equipment_Condition_Monitor&oldid=502601"

233

ITP Mining: The Future Begins with Mining- A Vision of the Mining Industry of the Future  

Broader source: Energy.gov [DOE]

This vision document details long-term goals and objectives for the mining industry. Stemming from this vision document, targeted technology roadmaps were developed that describe pathways of research to achieve the vision goals.

234

Coal Mining Regulations (Kentucky) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Coal Mining Regulations (Kentucky) Coal Mining Regulations (Kentucky) Coal Mining Regulations (Kentucky) < Back Eligibility Commercial Construction Developer Industrial Investor-Owned Utility Retail Supplier Program Info State Kentucky Program Type Environmental Regulations Siting and Permitting Provider Kentucky Department for Energy Development and Independence Kentucky Administrative Regulation Title 405 chapters 1, 2, 3, 5, 7, 8, 10, 12, 16, 18 and 20 establish the laws governing coal mining in the state. The Department of Natural Resources under the authority of the Energy and Environment Cabinet is responsible for enforcing these laws and assuring compliance with the 1977 Federal Surface Mining Control Act (SMCRA). The Division of Mine Reclamation and Enforcement is responsible for inspecting

235

Appliances and Commercial Equipment Standards: Guidance  

Broader source: Energy.gov (indexed) [DOE]

Office Office HOME ABOUT ENERGY EFFICIENT TECHNOLOGIES RESIDENTIAL BUILDINGS COMMERCIAL BUILDINGS APPLIANCE & EQUIPMENT STANDARDS BUILDING ENERGY CODES EERE » Building Technologies Office » Appliances & Equipment Standards About Standards & Test Procedures Implementation, Certification & Enforcement Rulemakings & Notices Further Guidance ENERGY STAR® Guidance and Frequently Asked Questions This webpage is designed to provide guidance and answer Frequently Asked Questions (FAQs) on the U.S. Department of Energy's appliance standards program. Guidance types span all covered products and covered equipment and cover such topics as: definitions, scope of coverage, conservation standards, test procedures, certification, Compliance and Certification Management System (CCMS), and enforcement. This website offers users an

236

Long Length Contaminated Equipment Maintenance Plan  

SciTech Connect (OSTI)

The purpose of this document is to provide the maintenance requirements of the Long Length Contaminated Equipment (LLCE) trailers and provide a basis for the maintenance frequencies selected. This document is applicable to the LLCE Receiver trailer and Transport trailer assembled by Mobilized Systems Inc. (MSI). Equipment used in conjunction with, or in support of, these trailers is not included. This document does not provide the maintenance requirements for checkout and startup of the equipment following the extended lay-up status which began in the mid 1990s. These requirements will be specified in other documentation.

ESVELT, C.A.

2000-02-01T23:59:59.000Z

237

Incidents of chemical reactions in cell equipment  

SciTech Connect (OSTI)

Strongly exothermic reactions can occur between equipment structural components and process gases under certain accident conditions in the diffusion enrichment cascades. This paper describes the conditions required for initiation of these reactions, and describes the range of such reactions experienced over nearly 50 years of equipment operation in the US uranium enrichment program. Factors are cited which can promote or limit the destructive extent of these reactions, and process operations are described which are designed to control the reactions to minimize equipment damage, downtime, and the possibility of material releases.

Baldwin, N.M.; Barlow, C.R. [Uranium Enrichment Organization, Oak Ridge, TN (United States)

1991-12-31T23:59:59.000Z

238

NAFTA opportunities: Electrical equipment and power generation  

SciTech Connect (OSTI)

The North American Free Trade Agreement (NAFTA) provides significant commercial opportunities in Mexico and Canada for the United States electric equipment and power generation industries, through increased goods and services exports to the Federal Electricity Commission (CFE) and through new U.S. investment in electricity generation facilities in Mexico. Canada and Mexico are the United States' two largest export markets for electrical equipment with exports of $1.53 billion and $1.51 billion, respectively, in 1992. Canadian and Mexican markets represent approximately 47 percent of total U.S. exports of electric equipment. The report presents an economic analysis of the section.

Not Available

1993-01-01T23:59:59.000Z

239

Microsoft Word - DOE-ID-11-007 Colorado Mines EC.doc  

Broader source: Energy.gov (indexed) [DOE]

7 7 SECTION A. Project Title: Imaging Upgrades for the Colorado School of Mines Nuclear Science and Engineering Program - Colorado School of Mines SECTION B. Project Description This project has three objectives: 1. Upgrade the Transmission Electron Microscope in the Active Materials Characterization Laboratory (ActMCL) with a digital imaging system 2. Upgrade the ActMCL and Nuclear Fuel Development Lab (NFDL) with modern radiation detection and measurement equipment, for both research and radiological control purposes 3. Upgrade the Nuclear Science and Engineering Computer Laboratory (NSECL) to provide dedicated cluster computing, 3-D visualization, and 3-D printing capabilities The instrument acquisition will enhance the capabilities of the Colorado School of Mines Nuclear Science and Engineering Program

240

Definition: Equipment Rating | Open Energy Information  

Open Energy Info (EERE)

Rating Rating Jump to: navigation, search Dictionary.png Equipment Rating The maximum and minimum voltage, current, frequency, real and reactive power flows on individual equipment under steady state, short-circuit and transient conditions, as permitted or assigned by the equipment owner.[1] Also Known As Standard current ratings Related Terms reactive power, smart grid References ↑ Glossary of Terms Used in Reliability Standards An i LikeLike UnlikeLike You like this.Sign Up to see what your friends like. nline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Equipment_Rating&oldid=502535" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties

Note: This page contains sample records for the topic "inputs mining equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Piedmont Natural Gas - Residential Equipment Efficiency Program |  

Broader source: Energy.gov (indexed) [DOE]

Piedmont Natural Gas - Residential Equipment Efficiency Program Piedmont Natural Gas - Residential Equipment Efficiency Program Piedmont Natural Gas - Residential Equipment Efficiency Program < Back Eligibility Residential Savings Category Heating & Cooling Commercial Heating & Cooling Heating Appliances & Electronics Water Heating Maximum Rebate 2 rebates per household Program Info State North Carolina Program Type Utility Rebate Program Rebate Amount High-Efficiency Furnace: $175 Tankless Water Heater: $150 Tank Water Heater: $50 Provider Gas Technology and Energy Services Piedmont Natural Gas offers rebates on high-efficiency natural gas tankless water heaters, tank water heaters and furnaces. Customers on the 101-Residential Service rate are eligible for these rebates. Rebates are only provided for qualifying natural gas equipment that is installed to

242

Laboratory Equipment Donation Program - Home Page  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

U.S. Department of Energy U.S. Department of Energy Laboratory Equipment Donation Program Home About LEDP FAQ Application Site Index Contact Us Administrative Login SEARCH: Go! view equipment list LEDP News Latest Equipment Added as of January 08, 2014: 1. DATA HANDLING SYSTEM 89514133530195 2. METER, VOLT 89514133530179 3. RECORDER, STRIP 89514133530184 4. RECORDER, STRIP 89514133530185 5. SCINTILLATOR STRIPS, 1.9 CM X 1.5 CM X 96 CM 89514133530188 Quick Links What type of equipment is available? Who is eligible to apply? How long will it take to find out if my application has been approved? Who is responsible for arranging and paying for shipping? RSS Get Widgets Bookmark and Share Get the tools you need to inspire innovation and creativity The United States Department of Energy (DOE), in accordance with its

243

Energy Sub-Metering Equipment and Applications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Energy Sub-Metering Equipment and Applications Energy Sub-Metering Equipment and Applications Speaker(s): Sim Gurewitz Date: July 24, 2008 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Paul Mathew This talk will address the following topics:Submetering basics: What is it? How does a submeter work?How to obtain a finer level of energy information within the buildingApplications: Who submeters and why?LEED NC/EB/CS and submetering / Energy & Atmosphere pointsSubmetering equipment: gas, electric, water, steam, CW Btu and HHW BtuHow to install equipment without scheduling an outageLoad Control option for automated load shedding and peak shavingWireless submeters and communication options / integration to EMS-BMCSAutomatic remote meter reading and cost allocation softwarePutting it all together into a metering SYSTEM: read from anywhere, IP

244

HVAC Equipment Rebate Program | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

HVAC Equipment Rebate Program HVAC Equipment Rebate Program HVAC Equipment Rebate Program < Back Eligibility Agricultural Commercial Industrial Installer/Contractor Institutional Multi-Family Residential Nonprofit Schools Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Heat Pumps Maximum Rebate Rebates of greater than $5,000 require pre-approval Program Info Funding Source Efficiency Vermont Public Benefit Fund Expiration Date 06/30/2013 State Vermont Program Type State Rebate Program Rebate Amount Varies depending on technology and efficiency Provider Efficiency Vermont NOTE: Rebate reservations are required for all boiler and furnace projects. Efficiency Vermont offers rebates for commercial installations of high-efficiency HVAC equipment and controls. For businesses and purchases

245

Industrial Equipment Demand and Duty Factors  

E-Print Network [OSTI]

Demand and duty factors have been measured for selected equipment (air compressors, electric furnaces, injection molding machines, centrifugal loads, and others) in industrial plants. Demand factors for heavily loaded air compressors were near 100...

Dooley, E. S.; Heffington, W. M.

246

BCM 2 Equipment Inventory | Sample Preparation Laboratories  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

& Material Science Laboratory 2 Title Equipment Type Description Accumet Basic AB15 pH meter pH Meter pH meters with combination AgAgCl electrode and ATC probe. Corning 430 pH...

247

UNIVERSITY OF WASHINGTON ANNUAL EQUIPMENT TESTING AND  

E-Print Network [OSTI]

UNIVERSITY OF WASHINGTON ANNUAL EQUIPMENT TESTING AND MAINTENANCE SUMMARY DIVING SAFETY PROGRAM Date Tested Condition when received Intermediate Pressure Inhalation Resistance Exhalation Resistance Tested Make Serial Number Date Tested Results DEPTH GAUGE BUOYANCY COMPENSATOR Make Serial Number Date

Wilcock, William

248

Safety Topic: Rota/ng Equipment  

E-Print Network [OSTI]

Safety Topic: Rota/ng Equipment Jus/n Kleingartner #12;Safety protocols 2 #12;Safety protocols for opera/ng a lathe · Don'ts: ­ Do not wear gloves

Cohen, Robert E.

249

An Approach to Evaluating Equipment Efficiency Policies  

E-Print Network [OSTI]

AN APPROACH TO EVALUATING EQUIPMENT EFFICIENCY POLICIES Donald E. Newsom, Ph.D. and Allan R. Evans, Ph.D., P.E. Argonne National Laboratory, Argonne, Illinois ABSTRACT The National Energy Conservation Policy Act of 1978 authorized studies...

Newsom, D. E.; Evans, A. R.

1980-01-01T23:59:59.000Z

250

Cruising Equipment Company CECO | Open Energy Information  

Open Energy Info (EERE)

Cruising Equipment Company CECO Cruising Equipment Company CECO Jump to: navigation, search Name Cruising Equipment Company (CECO) Place Seattle, Washington Zip 98107 Product Maker of pollution control equipment - bought by Xantrex in 2000. Coordinates 47.60356°, -122.329439° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.60356,"lon":-122.329439,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

251

AS A MINING ENGINEER Mining provides the raw materials and energy resources needed to sustain modern civilization. Mining Engineers  

E-Print Network [OSTI]

AS A MINING ENGINEER Mining provides the raw materials and energy resources needed to sustain · BHP Billiton New Mexico Coal · Peabody Energy · Arch Coal · Bowie Resources · Foresight Coal · Walter modern civilization. Mining Engineers are trained to determine the safest most sustainable way to remove

Simons, Jack

252

Colorado School of Mines Graduate Bulletin 1999-2000 1 School of Mines  

E-Print Network [OSTI]

Colorado School of Mines Graduate Bulletin 1999-2000 1 Colorado School of Mines 1999-2000 Graduate Bulletin #12;2 Colorado School of Mines Graduate Bulletin 1999-2000 To CSM Graduate Students This Bulletin is for your use as a source of continuing reference. Please save it. Published by Colorado School of Mines

253

Colorado School of Mines Graduate Bulletin 2001-2002 1 School of Mines  

E-Print Network [OSTI]

Colorado School of Mines Graduate Bulletin 2001-2002 1 Colorado School of Mines 2001-2002 Graduate Bulletin #12;2 Colorado School of Mines Graduate Bulletin 2001-2002 To CSM Graduate Students This Bulletin is for your use as a source of continuing reference. Please save it. Published by Colorado School of Mines

254

8/19/2002 Data Mining: Foundation, Techniques and Applications 1 Data Mining: Foundation,  

E-Print Network [OSTI]

8/19/2002 Data Mining: Foundation, Techniques and Applications 1 Data Mining: Foundation;12/3/2007 Data Mining: Foundation, Techniques and Applications 2 Outline Introduction Foundation Graph Similarity for Keyword Search #12;12/3/2007 Data Mining: Foundation, Techniques and Applications 3 Graph, Graph

Tung, Anthony Kum Hoe

255

Spatial Data Mining, Michael May, Fraunhofer AIS 1 Spatial Data Mining for Customer  

E-Print Network [OSTI]

Spatial Data Mining, Michael May, Fraunhofer AIS 1 Spatial Data Mining for Customer Segmentation Intelligente Systeme #12;Spatial Data Mining, Michael May, Fraunhofer AIS 2 Introduction: a classic example? A good representation is the key to solving a problem Disease cluster #12;Spatial Data Mining, Michael

Morik, Katharina

256

LLM Oil, Gas and Mining Law Module Information: Oil, Gas & Mining Environmental Law I and  

E-Print Network [OSTI]

provide the arena in which the petroleum and mining conduct their operations, including the specific

Evans, Paul

257

On the Wind Power Input to the Ocean General Circulation  

E-Print Network [OSTI]

The wind power input to the ocean general circulation is usually calculated from the time-averaged wind products. Here, this wind power input is reexamined using available observations, focusing on the role of the synoptically ...

Zhai, Xiaoming

258

INGEN: A COBRA-NC input generator user's manual  

SciTech Connect (OSTI)

The INGEN (INput GENerator) computer program has been developed as a preprocessor to simplify input generation for the COBRA-NC computer program. INGEN uses several empirical correlations and geometric assumptions to simplify the data input requirements for the COBRA-NC computer code. The simplified input scheme is obtained at the expense of much flexibility provided by COBRA-NC. For more complex problems requiring additional flexibility however, INGEN may be used to provide a skeletal input file to which the more detailed input may be added. This report describes the input requirements for INGEN and describes the algorithms and correlations used to generate the COBRA-NC input. 9 refs., 3 figs., 6 tabs.

Wheeler, C.L.; Dodge, R.E.

1986-12-01T23:59:59.000Z

259

,"U.S. Refinery Crude Oil Input Qualities"  

U.S. Energy Information Administration (EIA) Indexed Site

Sulfur Content (Weighted Average) of Crude Oil Input to Refineries (Percent)","U.S. API Gravity (Weighted Average) of Crude Oil Input to Refineries (Degrees)" 31062,0.88,32.64...

260

,"U.S. Refinery Crude Oil Input Qualities"  

U.S. Energy Information Administration (EIA) Indexed Site

Sulfur Content (Weighted Average) of Crude Oil Input to Refineries (Percent)","U.S. API Gravity (Weighted Average) of Crude Oil Input to Refineries (Degrees)" 31228,0.91,32.46...

Note: This page contains sample records for the topic "inputs mining equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

The Silicon Mine | Open Energy Information  

Open Energy Info (EERE)

Mine Mine Jump to: navigation, search Name The Silicon Mine Place Netherlands Sector Solar Product The Silicon Mine (TSM) will produce solar grade polysilicon suitable for the production of wafers or as the base material for the manufacture of solar cells. References The Silicon Mine[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. The Silicon Mine is a company located in Netherlands . References ↑ "The Silicon Mine" Retrieved from "http://en.openei.org/w/index.php?title=The_Silicon_Mine&oldid=352196" Categories: Clean Energy Organizations Companies Organizations Stubs What links here Related changes Special pages Printable version Permanent link Browse properties

262

South Carolina Mining Act (South Carolina)  

Broader source: Energy.gov [DOE]

The South Carolina Mining Act seeks to offer the greatest practical degree of protection and restoration to usefulness, productivity, and scenic values of all SC lands and waters involved in mining...

263

WIPP Mine Rescue Team Wins Colorado Competition  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

in five years. The Colorado State Mine Inspector's Office, in conjunction with the Colorado School of Mines, hosted the Western Regional, June 12-14 in Golden, Colorado. The...

264

Oil, Gas, and Mining Leases (Nebraska)  

Broader source: Energy.gov [DOE]

This section contains rules on oil, gas, and mining leases, and grants authority to the State of Nebraska and local governments to issue leases for oil and gas mining and exploration on their lands.

265

WIPP Takes Second in Mine Rescue Competition  

Broader source: Energy.gov [DOE]

CARLSBAD, N.M. – EM’s Waste Isolation Pilot Plant (WIPP) mine rescue team placed second in the Southwestern Regional Mine Rescue Competition this past spring in Carlsbad, and it took home more than a trophy.

266

Climate VISION: Private Sector Initiatives: Mining: Resources...  

Office of Scientific and Technical Information (OSTI)

National Mining Association's (NMA) mission is to create and maintain a broad base of political support for the mining industry and to help the nation realize the economic and...

267

Computer optimization of earthmoving equipment arrays  

E-Print Network [OSTI]

higher degree of equipment specialization. Thus, the con- tractor attempts now to insure that individual segments of jobs are performed by the most economical means available to him. The choice of equipment to be used is difficult indeed... drawn carts. Next came use of the drag scraper followed by a wheel-mounted scraper which could dig, transport and dump its load. A major contribution to the earthmoving industry was the track-type tractor, which was developed in 1904. The potential...

Pate, Jep Earl

2012-06-07T23:59:59.000Z

268

List of Agricultural Equipment Incentives | Open Energy Information  

Open Energy Info (EERE)

Agricultural Equipment Incentives Agricultural Equipment Incentives Jump to: navigation, search The following contains the list of 90 Agricultural Equipment Incentives. CSV (rows 1 - 90) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active Agricultural Energy Efficiency Program (New York) State Rebate Program New York Agricultural Agricultural Equipment Boilers Chillers Custom/Others pending approval Dishwasher Furnaces Heat pumps Heat recovery Lighting Lighting Controls/Sensors Motor VFDs Motors Water Heaters Commercial Cooking Equipment Commercial Refrigeration Equipment Food Service Equipment Yes Agricultural Lighting and Equipment Rebate Program (Vermont) State Rebate Program Vermont Agricultural Agricultural Equipment Custom/Others pending approval Lighting

269

CRAD, Nuclear Facility Construction - Mechanical Equipment - June 26, 2012  

Broader source: Energy.gov (indexed) [DOE]

Nuclear Facility Construction - Mechanical Equipment - June Nuclear Facility Construction - Mechanical Equipment - June 26, 2012 CRAD, Nuclear Facility Construction - Mechanical Equipment - June 26, 2012 June 26, 2012 Nuclear Facility Construction - Mechanical Equipment Installation, (HSS CRAD 45-53, Rev. 0) The purpose of this criteria review and approach, this CRAD includes mechanical equipment installation, including connections of the equipment to installed piping systems, and attachments of the equipment to structures (concrete, structural steel, or embed plates). Mechanical equipment includes items such as pumps and motors, valves, tanks, glove boxes, heat exchangers, ion exchangers, service air system, fire pumps and tanks, and heating, ventilation, and air condition (HVAC) equipment such as fans, scrubbers and filters.

270

Alternative Fuels Data Center: Pollution Control Equipment Exemption  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Pollution Control Pollution Control Equipment Exemption to someone by E-mail Share Alternative Fuels Data Center: Pollution Control Equipment Exemption on Facebook Tweet about Alternative Fuels Data Center: Pollution Control Equipment Exemption on Twitter Bookmark Alternative Fuels Data Center: Pollution Control Equipment Exemption on Google Bookmark Alternative Fuels Data Center: Pollution Control Equipment Exemption on Delicious Rank Alternative Fuels Data Center: Pollution Control Equipment Exemption on Digg Find More places to share Alternative Fuels Data Center: Pollution Control Equipment Exemption on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Pollution Control Equipment Exemption Dedicated original equipment manufacturer natural gas vehicles and

271

Coal mine methane global review  

SciTech Connect (OSTI)

This is the second edition of the Coal Mine Methane Global Overview, updated in the summer of 2008. This document contains individual, comprehensive profiles that characterize the coal and coal mine methane sectors of 33 countries - 22 methane to market partners and an additional 11 coal-producing nations. The executive summary provides summary tables that include statistics on coal reserves, coal production, methane emissions, and CMM projects activity. An International Coal Mine Methane Projects Database accompanies this overview. It contains more detailed and comprehensive information on over two hundred CMM recovery and utilization projects around the world. Project information in the database is updated regularly. This document will be updated annually. Suggestions for updates and revisions can be submitted to the Administrative Support Group and will be incorporate into the document as appropriate.

NONE

2008-07-01T23:59:59.000Z

272

How Sensitive is Processor Customization to the Workload's Input Datasets?  

E-Print Network [OSTI]

How Sensitive is Processor Customization to the Workload's Input Datasets? Maximilien Breughe Zheng though is to what extent processor customiza- tion is sensitive to the training workload's input datasets. Current practice is to consider a single or only a few input datasets per workload during the processor

Eeckhout, Lieven

273

Watt Carves Up Strip-Mining Policy  

Science Journals Connector (OSTI)

...70 percent of the nation's coal mining. Ad-ditional suggestions have...vice presi-dent of the Garland Coal and Mining Company in Arkansas, is one...R. JEFFREY SMITH *Surface Mining: Soil, Coal, and Society (Nation-al Research...

R. JEFFREY SMITH

1981-05-15T23:59:59.000Z

274

Strip Mining: Congress Moves toward "Tough" Regulation  

Science Journals Connector (OSTI)

...decades the strip mining of coal has blighted...mountains of Appalachia. Many states...regard strip mining as a scourge...than it is in Appalachia, the west-erners...near-surface coal deposits are exploited 513 Strip Mining: Congress Moves...

Luther J. Carter

1974-08-09T23:59:59.000Z

275

Dawdon Mine Water Heat Pump Trial  

E-Print Network [OSTI]

14-Dec-12 Dawdon Mine Water Heat Pump Trial #12;14 December 2012 2 Potential for Mine Water sourced heating Dawdon heat pump trial A demonstration project Contents #12;Friday, 14 December 2012 3 The UK salinity High Iron (removed by lime treatment) Offices , 8 rooms #12;Dawdon heat pump Warm mine water

Oak Ridge National Laboratory

276

SPATIAL DATA MINING IMPLEMENTATION Alternatives and perfermances  

E-Print Network [OSTI]

SPATIAL DATA MINING IMPLEMENTATION Alternatives and perfermances NADJIM CHELGHOUM, KARINE ZEITOUNI Abstract: Spatial data mining requires the analysis of the interactions in space. These interactions can be materialized using distance tables, reducing spatial data mining to multi-table analysis. However, conventional

Zeitouni, Karine

277

Frontiers of biomedical text mining: current progress  

E-Print Network [OSTI]

Frontiers of biomedical text mining: current progress Pierre Zweigenbaum, Dina Demner-Fushman, Hong of biomedical text mining continue to present interesting challenges and opportunities for great improvements and interesting research. In this article we review the current state of the art in biomedical text mining or `Bio

Yu, Hong

278

The Pittsburg & Midway Coal Mining Co. Kemmerer Mine coal blending facility  

SciTech Connect (OSTI)

The Pittsburg & Midway Coal Mining Company`s Kemmerer Mine recently completed a new coal processing facility for blending the mine`s low, medium, and high sulfur coals to meet the needs of our customers. This article will discuss the geology; mining and market conditions that led to the need for this facility; design considerations; the construction; and the system`s controls and performance.

Mulhall, K.; Crank, G. [Pittsburg & Midway Coal Mining Co., Kemmerer, WY (United States)

1995-08-01T23:59:59.000Z

279

Treatment of acid mine wastewaters  

SciTech Connect (OSTI)

Acid mine drainage often results from the oxidation sulfide minerals to form sulfuric acid. As a consequence, high concentrations of metals in the both the suspended and dissolved state result from the low pH water. This paper discusses several of the more common treatment methods for acid mine drainage including the use of chemical precipitation agents, pH correction agents, filtration methods, and biodegradation methods. Advanced treatment technologies are also briefly described and include microfiltration, reverse osmosis, ion exchange, and electrodialysis.

Hayward, D.; Barnard, R.

1993-06-01T23:59:59.000Z

280

AI en Data mining Van AI tot Data mining  

E-Print Network [OSTI]

een heel breed vakgebied, met onder andere: · robotica: Hoe programmeer je een robot? · data mining soort computerprogramma's doet mee in de jaarlijkse Loebner-contest. 6 #12;AI Robotica Een robot is een science fiction schrijver Isaac Asimov (auteur van "I, Robot") zijn de drie wetten van de robotica: 1. Een

Kosters, Walter

Note: This page contains sample records for the topic "inputs mining equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Development and Demonstration of a Modeling Framework for Assessing the Efficacy of Using Mine Water for Thermoelectric Power Generation  

SciTech Connect (OSTI)

Thermoelectric power plants use large volumes of water for condenser cooling and other plant operations. Traditionally, this water has been withdrawn from the cleanest water available in streams and rivers. However, as demand for electrical power increases it places increasing demands on freshwater resources resulting in conflicts with other off stream water users. In July 2002, NETL and the Governor of Pennsylvania called for the use of water from abandoned mines to replace our reliance on the diminishing and sometimes over allocated surface water resource. In previous studies the National Mine Land Reclamation Center (NMLRC) at West Virginia University has demonstrated that mine water has the potential to reduce the capital cost of acquiring cooling water while at the same time improving the efficiency of the cooling process due to the constant water temperatures associated with deep mine discharges. The objectives of this project were to develop and demonstrate a user-friendly computer based design aid for assessing the costs, technical and regulatory aspects and potential environmental benefits for using mine water for thermoelectric generation. The framework provides a systematic process for evaluating the hydrologic, chemical, engineering and environmental factors to be considered in using mine water as an alternative to traditional freshwater supply. A field investigation and case study was conducted for the proposed 300 MW Beech Hollow Power Plant located in Champion, Pennsylvania. The field study based on previous research conducted by NMLRC identified mine water sources sufficient to reliably supply the 2-3,000gpm water supply requirement of Beech Hollow. A water collection, transportation and treatment system was designed around this facility. Using this case study a computer based design aid applicable to large industrial water users was developed utilizing water collection and handling principals derived in the field investigation and during previous studies of mine water and power plant cooling. Visual basic software was used to create general information/evaluation modules for a range of power plant water needs that were tested/verified against the Beech Hollow project. The program allows for consideration of blending mine water as needed as well as considering potential thermal and environmental benefits that can be derived from using constant temperature mine water. Users input mine water flow, quality, distance to source, elevations to determine collection, transport and treatment system design criteria. The program also evaluates low flow volumes and sustainable yields for various sources. All modules have been integrated into a seamless user friendly computer design aid and user's manual for evaluating the capital and operating costs of mine water use. The framework will facilitate the use of mine water for thermoelectric generation, reduce demand on freshwater resources and result in environmental benefits from reduced emissions and abated mine discharges.

None

2010-03-01T23:59:59.000Z

282

Electricity Used by Office Equipment and Network Equipment in the U.S.: Detailed Report and Appendices  

E-Print Network [OSTI]

LBNL-45917 Electricity Used by Office Equipment and Network Equipment in the U.S.: Detailed Report..............................................................................................46 #12;#12;1 Electricity Used by Office Equipment and Network Equipment in the U.S. Kaoru Kawamoto and network equipment, there has been no recent study that estimates in detail how much electricity

283

1982 analyses and reports: equipment availability report; component cause code report; and equipment availability report  

SciTech Connect (OSTI)

This equipment availability report (1973 to 1982, 1982) presents statistical information on the performance of the major types of generating units and their major component groups. (DLC)

Not Available

1982-01-01T23:59:59.000Z

284

ITP Mining: Energy and Environmental Profile of the U.S. Mining Industry: Chapter 1: U.S. Mining Overview  

Broader source: Energy.gov (indexed) [DOE]

1 1 Mining Overview 1. Mining: Backbone of the U.S. Economy Mining is the search for, extraction, and beneficiation and processing of solid minerals from the earth. The kinds of minerals extracted from the earth vary widely. For thousands of years, these and other minerals have provided the raw materials with which human civilizations have been built. The United States Department of Energy and the National Mining Association are working in partnership to implement the Mining Industry of the Future strategy. Cooperatively, the Department of Energy and National Mining Association selected specific mineral commodities to review in this Mining Energy and Environmental Profile. These commodities require significant energy to extract and prepare for first saleable product and have the potential for

285

U.S. Blender Net Input  

U.S. Energy Information Administration (EIA) Indexed Site

2007 2008 2009 2010 2011 2012 View 2007 2008 2009 2010 2011 2012 View History Total Input 1,184,435 1,522,193 1,850,204 2,166,784 2,331,109 2,399,318 2005-2012 Natural Gas Plant Liquids and Liquefied Refinery Gases 3,445 5,686 6,538 7,810 10,663 2008-2012 Pentanes Plus 2,012 474 1,808 1,989 2,326 4,164 2005-2012 Liquid Petroleum Gases 2,971 3,878 4,549 5,484 6,499 2008-2012 Normal Butane 2,943 2,971 3,878 4,549 5,484 6,499 2005-2012 Isobutane 2005-2006 Other Liquids 1,518,748 1,844,518 2,160,246 2,323,299 2,388,655 2008-2012 Oxygenates/Renewables 234,047 274,974 286,837 295,004 2009-2012 Methyl Tertiary Butyl Ether (MTBE) 2005-2006 Renewable Fuels (incl. Fuel Ethanol) 234,047 274,974 286,837 295,004 2009-2012 Fuel Ethanol 131,810 182,772 232,677 273,107 281,507 287,433 2005-2012

286

U.S. Blender Net Input  

U.S. Energy Information Administration (EIA) Indexed Site

Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 View Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 View History Total Input 206,541 217,867 212,114 216,075 219,783 208,203 2005-2013 Natural Gas Plant Liquids and Liquefied Refinery Gases 891 352 376 196 383 1,397 2008-2013 Pentanes Plus 261 301 313 67 287 393 2005-2013 Liquid Petroleum Gases 630 51 63 129 96 1,004 2008-2013 Normal Butane 630 51 63 129 96 1,004 2005-2013 Isobutane 2005-2006 Other Liquids 205,650 217,515 211,738 215,879 219,400 206,806 2008-2013 Oxygenates/Renewables 25,156 26,576 26,253 26,905 27,788 25,795 2009-2013 Methyl Tertiary Butyl Ether (MTBE) 2005-2006 Renewable Fuels (incl. Fuel Ethanol) 25,156 26,576 26,253 26,905 27,788 25,795 2009-2013 Fuel Ethanol 24,163 25,526 24,804 25,491 25,970 24,116 2005-2013

287

Interstate Mining Compact (Maryland) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

You are here You are here Home » Interstate Mining Compact (Maryland) Interstate Mining Compact (Maryland) < Back Eligibility Commercial Developer Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Utility Program Info State Maryland Program Type Environmental Regulations Provider Interstate Mining Compact Commission This legislation authorizes the state's entrance into the Interstate Mining Compact, a multi-state governmental agency / organization that represents the natural resource and related environmental protection interests of its member states. Currently, 23 states are members to the compact, and 6 additional states are associate members. The compact is administered by the Interstate Mining Compact Commission, which does not possess regulatory

288

Opencut Mining Act (Montana) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Opencut Mining Act (Montana) Opencut Mining Act (Montana) Opencut Mining Act (Montana) < Back Eligibility Utility Investor-Owned Utility Industrial Construction Municipal/Public Utility Installer/Contractor Rural Electric Cooperative Program Info State Montana Program Type Siting and Permitting Provider Montana Department of Environmental Quality The policy of the state is to provide adequate remedies to protect the environmental life support system from degradation and to prevent unreasonable depletion and degradation of natural resources from strip and underground mining. This Act imposes permitting and operating restrictions on opencut mining activities. The Act contains permitting, siting, and procedural requirements; more specific regulations can be found in the Administrative Rules of Montana

289

Drilling and blasting techniques and costs for strip mines in Appalachia  

SciTech Connect (OSTI)

On-site investigations of blasting techniques were conducted at twenty surface coal mining operations in the steep slopes of Appalachia. The mine sites represented a range of mountain mining methods and annual coal production levels; all sites used similar techniques and equipment for the removal of fragmented waste rock. Hole loading characteristics and constraints limiting blast designs were observed at each mine site. This report summarizes technical blasting data and geological conditions which require special design considerations. Three mine sites were selected for future research in fragmentation efficiency. Detailed economic data on drilling and blasting were gathered from the three research sites and are reported herein. A great deal of fragmentation difficulties stem from tough, unpredictable geology with specific bedding characteristics and local zones of defined structural weaknesses such as jointing and vertical seams. Exceptionally hard bedrock, existing as a caprock or as the basal layer above the coal seam, persists as the cause of oversize rock breakage or, in the latter case, damage to the coal unless special precautions are taken. Federal blasting regulations strictly control the amount of explosives used as well as throw of the fragmented rock. This requires that blasting modifications be employed. The nature and extent of blast modifications were observed to be related to terrain and demographic conditions around the mine site. Drilling and blasting costs reported for the three mine sites averaged $0.21 per cubic yard of material blasted. Drilling costs varied widely, as drilling time was indicative of geologies and often, drilling costs remained the greatest percentage of total blasting and drilling costs.

Aimone, C.T.

1980-06-01T23:59:59.000Z

290

New Frontiers from the Mine  

E-Print Network [OSTI]

government officials and their expectations? Working with experts in applied ethics helps us develop valuable for communities and workforce Lowering fresh water use Reducing energy use / boosting renewable energy Shrinking the mining footprint Leading sustainable resource development Informing policy decisions #12

Wong, Pak Kin

291

Data Mining: Concepts and Techniques  

E-Print Network [OSTI]

1 Data Mining: Concepts and Techniques (3rd ed.) -- Chapter 3 -- Jiawei Han, Micheline Kamber. All rights reserved. #12;2013/08/12 2 #12;33 Chapter 3: Data Preprocessing n Data Preprocessing: An Overview n Data Quality n Major Tasks in Data Preprocessing n Data Cleaning n Data Integration n Data

Geldenhuys, Jaco

292

Fast RNA Structure Alignment for Crossing Input Rolf Backofena  

E-Print Network [OSTI]

$5.9 B $7.5 B $4.3 B $7.1 B $7.0 B $9.3 B #12;Utah Oil and Gas Conservation Act · Established in 1955 are required ­ Bond ­ standardized unit cost of disturbance · Small Mines ­ less than 10 acres (in unincorporated areas) ­ Mining, hauling, and processing ­ Applications are 6-7 pages in length ­ Minimum of two

Will, Sebastian

293

Alternative Fuels Data Center: Ethanol Production Equipment Tax Exemption  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Ethanol Production Ethanol Production Equipment Tax Exemption to someone by E-mail Share Alternative Fuels Data Center: Ethanol Production Equipment Tax Exemption on Facebook Tweet about Alternative Fuels Data Center: Ethanol Production Equipment Tax Exemption on Twitter Bookmark Alternative Fuels Data Center: Ethanol Production Equipment Tax Exemption on Google Bookmark Alternative Fuels Data Center: Ethanol Production Equipment Tax Exemption on Delicious Rank Alternative Fuels Data Center: Ethanol Production Equipment Tax Exemption on Digg Find More places to share Alternative Fuels Data Center: Ethanol Production Equipment Tax Exemption on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol Production Equipment Tax Exemption

294

Novel Energy Conversion Equipment for Low Temperature Geothermal...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Novel Energy Conversion Equipment for Low Temperature Geothermal Resources Novel Energy Conversion Equipment for Low Temperature Geothermal Resources Project objective: Develop...

295

Microsoft Word - CX_McNaryEquipmentAcquisition.doc  

Broader source: Energy.gov (indexed) [DOE]

to purchase equipment owned by Umatilla Electric Cooperative (UEC) within BPA's McNary Substation. BPA already maintains all of UEC's equipment in the substation under an...

296

Dispensing Equipment Testing With Mid-Level Ethanol/Gasoline...  

Energy Savers [EERE]

Dispensing Equipment Testing With Mid-Level EthanolGasoline Test Fluid Dispensing Equipment Testing With Mid-Level EthanolGasoline Test Fluid The National Renewable Energy...

297

NSLS Services | Repair & Equipment Services  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Repair & Equipment Services Repair & Equipment Services Cleaning Facility (BNL Central Shops) Solvent cleaning of vacuum parts and leak checking service is also available. Work is billed to each user via a BNL ILR. Contact the NSLS Building Manager to arrange for any of these services. Electronics Repair Limited repairs for electronic equipment are available from an outside contractor through the Control Room. Contact Control Room Supervisor Randy Church (x2550 or x2736, pager 5310). Shipping memos are filled out on the web, and pick ups are on Fridays. Come to the Control Room for assistance. The user should call the contractor on the day before scheduled pickups to alert the contractor of the pickup. Items to be repaired should be left in the Control Room with the completed shipping memo. Costs are charged to the

298

dieSel/heAvy equipMent College of Rural and Community Development  

E-Print Network [OSTI]

and equipment overhauls. Students work on large truck fuel, electrical and air systems, diesel engines 907-455-2809 www.ctc.uaf.edu/programs/diesel/ certificate Minimum Requirements for Certificate: 36 credits The diesel and heavy equipment mechanics program offers the student training in the maintenance

Hartman, Chris

299

After-hours Power Status of Office Equipment and Inventory of Miscellaneous Plug-Load Equipment  

E-Print Network [OSTI]

LBNL-53729 After-hours Power Status of Office Equipment and Inventory of Miscellaneous Plug-Load To download this paper and related data go to: http://enduse.lbl.gov/Projects/OffEqpt.html The work described.................................................................................................................................................5 Office Equipment Data Collection

300

Conceptual design report, CEBAF basic experimental equipment  

SciTech Connect (OSTI)

The Continuous Electron Beam Accelerator Facility (CEBAF) will be dedicated to basic research in Nuclear Physics using electrons and photons as projectiles. The accelerator configuration allows three nearly continuous beams to be delivered simultaneously in three experimental halls, which will be equipped with complementary sets of instruments: Hall A--two high resolution magnetic spectrometers; Hall B--a large acceptance magnetic spectrometer; Hall C--a high-momentum, moderate resolution, magnetic spectrometer and a variety of more dedicated instruments. This report contains a short description of the initial complement of experimental equipment to be installed in each of the three halls.

NONE

1990-04-13T23:59:59.000Z

Note: This page contains sample records for the topic "inputs mining equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Asset Management Equipment Disposal Form -Refrigerant Recovery  

E-Print Network [OSTI]

enters the waste stream with the charge intact (e.g., motor vehicle air conditioners, refrigeratorsAsset Management Equipment Disposal Form - Refrigerant Recovery Safe Disposal Requirements Under refrigeration, cold storage warehouse refrigeration, chillers, and industrial process refrigeration) has to have

Sin, Peter

302

WAMPANOAG WELLNESS EQUIPMENT LENDING BANK POLICIES & PROCEDURES  

E-Print Network [OSTI]

vacuums and steam cleaners, can be used to address immediate concerns, such as intense cleaning to remove to enable the Health Service to measure the environmental impact of the use of the equipment in the homes moisture levels or improve air quality. STEP TWO: RECOMMENDATIONS As noted, recommendations in the Home

303

Research equipment: Surface Acoustic Wave (SAW) devices  

E-Print Network [OSTI]

of the acoustic wave. More specifically, the equipment consists of: i. HP 4195A (10Hz-500MHz) ii. HP 8753ES (30kHz measurements on many SAW devices iii. Agilent E5061A (300kHz-1.5GHz) http Scientific Corp.): Atmospheric plasma etching, for surface cleaning, surface treatment and activation

Gizeli, Electra

304

Research equipment: Surface Acoustic Wave (SAW) devices  

E-Print Network [OSTI]

, the equipment consists of: i. HP 4195A (10Hz-500MHz) ii. HP 8753ES (30kHz-3GHz) with time-gating option. Agilent E5061A (300kHz-1.5GHz) Switch control Network Analyzer Quartz Crystal Microbalance-coating of various polymeric films. Expanded Plasma Cleaner & PlasmaFloTM (Harrick Scientific Corp.): Atmospheric

Gizeli, Electra

305

Processing Equipment 2" Davis-Standard Extruder  

E-Print Network [OSTI]

Processing Equipment 2" Davis-Standard Extruder Improved Melting Grooved Feeding Capabilities Multiple Pressure Ports Along the Barrel Screw Cooling Kit Rod Die With Valved Adapter Higher Throughputs L Ring 1'' General Purpose Screw 3 Air-Cooled Barrel Zones Gala Industries Underwater Micropelletizer

Bone, Gary

306

Standardized equipment labeling program for electrical utilities  

SciTech Connect (OSTI)

The purpose of this supporting document is to provide specific guidelines required for Electrical Utilities to implement and maintain a standard equipment and piping labeling program in accordance with WHC-SP-0708, Chapter 18, {open_quotes}Westinghouse Hanford Company Conduct of Operations Manual{close_quotes}. Specific guidelines include definition of program responsibilities.

Not Available

1994-07-19T23:59:59.000Z

307

Original article Enzymatic equipment of Ascosphaera apis  

E-Print Network [OSTI]

Original article Enzymatic equipment of Ascosphaera apis and the development of infection — The process of infection of honey bee brood by the fungus Ascosphaera apis was ini- tiated the fungus pierces the cuticle. Ascosphaera apis / Apis mellifera / larval cuticle / penetration / infection

Paris-Sud XI, Université de

308

PROJECT REPORT HVAC EQUIPMENT DEMOGRAPHICS AND CAPACITY  

E-Print Network [OSTI]

PROJECT REPORT HVAC EQUIPMENT DEMOGRAPHICS AND CAPACITY ANALYSIS TOOLS APPLICABLE TO MULTI Commercial HVAC Design Process 12 5.0 Conclusion 18 6.0 References 19 TABLE OF CONTENTS SECTIONS #12;MULTI performance by collectively improving the enve- lope, lighting and HVAC systems. The primary goals of the UC

California at Davis, University of

309

Standard hydrogen monitoring system equipment installation instructions  

SciTech Connect (OSTI)

This document provides the technical specifications for the equipment fabrication, installation, and sitework construction for the Standard Hydrogen Monitoring System. The Standard Hydrogen Monitoring System is designed to remove gases from waste tank vapor space and exhaust headers for continual monitoring and remote sample analysis.

Schneider, T.C.

1996-09-27T23:59:59.000Z

310

SAND AND GRAVEL MINING IN COLORADO RIPARIAN HABITATS  

E-Print Network [OSTI]

mines, but Western Colorado sand and gravel mining is also discussed. The similarities and differencesSAND AND GRAVEL MINING IN COLORADO RIPARIAN HABITATS Ma rk A. He i fner Supervising Mined Land Reclamation Specialist Colorado Division of Mined Land Reclamation 723 Centennial Building 1313 Sherman

311

Mercury/Waterfilling: Optimum Power Allocation with Arbitrary Input Constellations  

E-Print Network [OSTI]

Mercury/Waterfilling: Optimum Power Allocation with Arbitrary Input Constellations Angel Lozano gives the power allocation policy, referred to as mercury/waterfilling, that maximizes the sum mutual

VerdĂş, Sergio

312

V-139: Cisco Network Admission Control Input Validation Flaw...  

Broader source: Energy.gov (indexed) [DOE]

Sensitive Information U-270:Trend Micro Control Manager Input Validation Flaw in Ad Hoc Query Module Lets Remote Users Inject SQL Commands U-015: CiscoWorks Common...

313

,"New York Natural Gas Input Supplemental Fuels (MMcf)"  

U.S. Energy Information Administration (EIA) Indexed Site

Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","New York Natural Gas Input Supplemental Fuels (MMcf)",1,"Annual",2013 ,"Release Date:","1031...

314

Unidata Community Equipment Awards Cover Sheet Proposal Title  

E-Print Network [OSTI]

RAID array with 4 TB storage · Support equipment including a rack, rack console, uninterruptable power

315

STATE OF CALIFORNIA VERIFICATION OF HIGH EER EQUIPMENT  

E-Print Network [OSTI]

STATE OF CALIFORNIA VERIFICATION OF HIGH EER EQUIPMENT CEC-CF-4R-MECH-23 (Revised 08/09) CALIFORNIA of High EER Equipment (Page 1 of 2) Site Address: Enforcement Agency: Permit Number: Registration Number 2009 Verification of High EER Equipment Procedures for verification of High EER Equipment are described

316

STATE OF CALIFORNIA VERIFICATION OF HIGH EER EQUIPMENT  

E-Print Network [OSTI]

STATE OF CALIFORNIA VERIFICATION OF HIGH EER EQUIPMENT CEC-CF-6R-MECH-23-HERS (Revised 08/09) CALIFORNIA ENERGY COMMISSION INSTALLATION CERTIFICATE CF-6R-MECH-23-HERS Verification of High EER Equipment 2009 Verification of High EER Equipment Procedures for verification of High EER Equipment are described

317

New designs in reconstructing the mechanical equipment of hydroelectric stations  

Science Journals Connector (OSTI)

1. Reliable operation of mechanical equipment can be assured, provided timely conduction of repairs and reconstr...

S. V. Leeson

1996-03-01T23:59:59.000Z

318

Page 1 of 3 Policy: Fire Protection Equipment Policy  

E-Print Network [OSTI]

Page 1 of 3 Policy: Fire Protection Equipment Policy Responsible Party: Director, Safety and Risk The Office of Safety and Risk Management (SRM) has developed, and implemented the Fire Protection Equipment of Fire Protection Equipment throughout MSU to maintain its working order. Fire Protection Equipment

Dyer, Bill

319

Electrical Equipment Replacement: Energy Efficiency versus System Compatibility  

E-Print Network [OSTI]

upgrading electrical equipment to energy efficient models, including conductor sizing, overcurrent protective devices, grounding, and harmonics. The pages that follow provide guidance in the decision-making process when replacing electrical equipment... equipment. Several areas of compatibility must be addressed for equipment to work properly. Critical areas of concern are conductor sizing, overcurrent protection devices, grounding, and harmonics. Conductor Sizing Conductors are sized...

Massey, G. W.

2005-01-01T23:59:59.000Z

320

Building Technologies Office: About the Appliance and Equipment Standards  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About the Appliance and About the Appliance and Equipment Standards Program to someone by E-mail Share Building Technologies Office: About the Appliance and Equipment Standards Program on Facebook Tweet about Building Technologies Office: About the Appliance and Equipment Standards Program on Twitter Bookmark Building Technologies Office: About the Appliance and Equipment Standards Program on Google Bookmark Building Technologies Office: About the Appliance and Equipment Standards Program on Delicious Rank Building Technologies Office: About the Appliance and Equipment Standards Program on Digg Find More places to share Building Technologies Office: About the Appliance and Equipment Standards Program on AddThis.com... About History & Impacts Statutory Authorities & Rules Regulatory Processes

Note: This page contains sample records for the topic "inputs mining equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE)  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Electric Vehicle Electric Vehicle Supply Equipment (EVSE) Regulation Exemption to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Regulation Exemption on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Regulation Exemption on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Regulation Exemption on Google Bookmark Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Regulation Exemption on Delicious Rank Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Regulation Exemption on Digg Find More places to share Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Regulation Exemption on AddThis.com...

322

Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE)  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Electric Vehicle Electric Vehicle Supply Equipment (EVSE) Requirements to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Requirements on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Requirements on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Requirements on Google Bookmark Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Requirements on Delicious Rank Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Requirements on Digg Find More places to share Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Requirements on AddThis.com... More in this section... Federal State Advanced Search

323

Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE)  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Electric Vehicle Electric Vehicle Supply Equipment (EVSE) Installation Requirements to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Installation Requirements on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Installation Requirements on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Installation Requirements on Google Bookmark Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Installation Requirements on Delicious Rank Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Installation Requirements on Digg Find More places to share Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Installation Requirements on AddThis.com...

324

Training program requirements for remote equipment operators in nuclear facilities  

SciTech Connect (OSTI)

One of the most neglected areas in the engineering development of remotely operated equipment applications in nuclear environments is the planning of adequate training programs for the equipment operators. Remote equipment accidents cannot be prevented solely by engineered safety features on the equipment. As a result of the experiences in using remote equipment in the recovery effort at Three Mile Island Unit 2 (TMI-2), guidelines for the development of remote equipment operator training programs have been generated. The result is that a successful education and training program can create an environment favorable to the safe and effective implementation of a remote equipment program in a nuclear facility.

Palau, G.L.; Auclair, K.D.

1986-01-01T23:59:59.000Z

325

Alternative Fuels Data Center: Biodiesel Production and Blending Equipment  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Biodiesel Production Biodiesel Production and Blending Equipment Tax Credit to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Production and Blending Equipment Tax Credit on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Production and Blending Equipment Tax Credit on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Production and Blending Equipment Tax Credit on Google Bookmark Alternative Fuels Data Center: Biodiesel Production and Blending Equipment Tax Credit on Delicious Rank Alternative Fuels Data Center: Biodiesel Production and Blending Equipment Tax Credit on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Production and Blending Equipment Tax Credit on AddThis.com... More in this section... Federal State

326

Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE)  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Electric Vehicle Electric Vehicle Supply Equipment (EVSE) Requirements to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Requirements on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Requirements on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Requirements on Google Bookmark Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Requirements on Delicious Rank Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Requirements on Digg Find More places to share Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Requirements on AddThis.com... More in this section... Federal State Advanced Search

327

Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE)  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Electric Vehicle Electric Vehicle Supply Equipment (EVSE) Rebate - LADWP to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Rebate - LADWP on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Rebate - LADWP on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Rebate - LADWP on Google Bookmark Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Rebate - LADWP on Delicious Rank Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Rebate - LADWP on Digg Find More places to share Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Rebate - LADWP on AddThis.com... More in this section... Federal

328

Alternative Fuels Data Center: Mandatory Electric Vehicle Supply Equipment  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Mandatory Electric Mandatory Electric Vehicle Supply Equipment (EVSE) Building Standards to someone by E-mail Share Alternative Fuels Data Center: Mandatory Electric Vehicle Supply Equipment (EVSE) Building Standards on Facebook Tweet about Alternative Fuels Data Center: Mandatory Electric Vehicle Supply Equipment (EVSE) Building Standards on Twitter Bookmark Alternative Fuels Data Center: Mandatory Electric Vehicle Supply Equipment (EVSE) Building Standards on Google Bookmark Alternative Fuels Data Center: Mandatory Electric Vehicle Supply Equipment (EVSE) Building Standards on Delicious Rank Alternative Fuels Data Center: Mandatory Electric Vehicle Supply Equipment (EVSE) Building Standards on Digg Find More places to share Alternative Fuels Data Center: Mandatory Electric Vehicle Supply Equipment (EVSE) Building Standards on

329

ITP Mining: Mining Industry of the Future Mineral Processing Technology Roadmap  

Broader source: Energy.gov [DOE]

In June 1998, the Chairman of the National Mining Association and the Secretary of energy entered into a Compact to pursue a collaborative technology research partnership, the Mining Industry of the Future.

330

Injury experience in stone mining, 1992  

SciTech Connect (OSTI)

This Mine Safety and Health Administration (MSHA) informational report reviews in detail the occupational injury and illness experience of stone mining in the United States for 1992. Data reported by operators of mining establishments concerning work injuries are summarized by work location, accident classification, part of body injured, nature of injury, occupation, and principal type of mineral. Related information on employment, worktime, and operating activity also is presented. Data reported by independent contractors performing certain work at mining locations are depicted separately in this report. For ease of comparison with other metal and nonmetallic mineral mining industries and with coal mining, summary reference tabulations are included at the end of both the operator and the contractor sections of this report.

Not Available

1994-05-01T23:59:59.000Z

331

Surface mining: soil, coal, and society  

SciTech Connect (OSTI)

The book concentrates on the effects of surface mining of coal upon the utilization of another resource, soil. Possible planning and management strategies for land reclamation are studied and the problem of choosing the correct solution for a particular situation is considered taking the many factors into account. The goal of reconstructing soil after mining is to equal or exceed the productivity of pre-mine soils, with a change in landscape if necessary, with minimum disturbance to the local community. (252 refs.)

Not Available

1981-01-01T23:59:59.000Z

332

Institut Mines-Tlcom EPOC : Energy Proportional  

E-Print Network [OSTI]

? ? Renewable energy #12;Institut Mines-Télécom29/11/13 Green@Days Lille 28-29 Novembre 2013 Problem 5 time Workload Renewable energy ? ? regular electric #12;Institut Mines-Télécom29/11/13 Green@Days Lille 28Institut Mines-Télécom EPOC : Energy Proportional and Opportunistic Computing system 1 Labex Comin

Lefèvre, Laurent

333

Colorado School of Mines Undergraduate Bulletin 2001-2002 1 School of Mines  

E-Print Network [OSTI]

Colorado School of Mines Undergraduate Bulletin 2001-2002 1 Colorado School of Mines 2001 ­ 2002 Undergraduate Bulletin #12;2 Colorado School of Mines Undergraduate Bulletin 2001-2002 To CSM Students This Bulletin is for your use as a source of continuing reference. Please save it. Published by Colorado School

334

Colorado School of Mines Undergraduate Bulletin 1999-2000 1 School of Mines  

E-Print Network [OSTI]

Colorado School of Mines Undergraduate Bulletin 1999-2000 1 Colorado School of Mines 1999-2000 Undergraduate Bulletin #12;2 Colorado School of Mines Undergraduate Bulletin 1999-2000 To CSM Students This Bulletin is for your use as a source of continuing reference. Please save it. Published by Colorado School

335

Data Mining: Concepts and TechniquesFebruary 19, 2008 1 Data Mining  

E-Print Network [OSTI]

Data Mining: Concepts and TechniquesFebruary 19, 2008 1 Data Mining: Concepts and Techniques.cs.uiuc.edu/~hanj ©2006 Jiawei Han and Micheline Kamber, All rights reserved #12;Data Mining: Concepts and TechniquesFebruary 19, 2008 2 Chapter 2: Data Preprocessing Why preprocess the data? Descriptive data summarization

Raghavan, Vijay

336

THE IMPACT OF A URANIUM MINING SITE ON THE STREAM SEDIMENTS (CRUCEA MINE, ROMANIA)  

E-Print Network [OSTI]

THE IMPACT OF A URANIUM MINING SITE ON THE STREAM SEDIMENTS (CRUCEA MINE, ROMANIA) Petrescu L. 1 , Bilal E. 2 , Iatan L.E. 1 1 University of Bucharest, Faculty of Geology et Geophysics, Department methods were used to evaluate the impact of uranium mine dumps on the stream sedi- ments from Crucea

Paris-Sud XI, Université de

337

Performance Measures For Input Shaping and Command Generation  

E-Print Network [OSTI]

Performance Measures For Input Shaping and Command Generation Kris Kozak Department of Precision performance measures for input shaping and command generation have appeared in the literature, but very rarely have these measures been critically evaluated or thoroughly discussed. In this paper we review

Singhose, William

338

Univariate input models for stochastic simulation , NM Steiger4  

E-Print Network [OSTI]

of the continuous univariate probabilistic input processes that drive discrete-event simulation experiments that accu- rately mimic the behaviour of the random input processes driving the system under study. Often the following interrelated difficulties arise in attempts to use standard distribution families for simulation

339

ANALOG-DIGITAL INPUT OUTPUT SYSTEM FOR APPLE CO  

E-Print Network [OSTI]

ADIOS ANALOG-DIGITAL INPUT OUTPUT SYSTEM FOR APPLE CO NATIONAL RADIO ASTRONOMY OBSERVATORY TABLES ADIOS - ANALOG-DIGITAL INPUT OUTPUT SYSTEM FOR APPLE COMPUTER TABLE FOR CONTENTS Page I Module and Apple Card (Photograph) Figure 3 Complete Apple/ADIOS System (Photograph) Figure 4 Analog

Groppi, Christopher

340

Soft-Input Soft-Output Sphere Decoding Christoph Studer  

E-Print Network [OSTI]

Soft-Input Soft-Output Sphere Decoding Christoph Studer Integrated Systems Laboratory ETH Zurich Laboratory ETH Zurich, 8092 Zurich, Switzerland Email: boelcskei@nari.ee.ethz.ch Abstract--Soft-input soft, 8092 Zurich, Switzerland Email: studer@iis.ee.ethz.ch Helmut Bölcskei Communication Technology

Note: This page contains sample records for the topic "inputs mining equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Link: exploiting the web of data to generate test inputs  

Science Journals Connector (OSTI)

Applications that process complex data, such as maps, personal data, book information, travel data, etc., are becoming extremely common. Testing such applications is hard, because they require realistic and coherent test inputs that are expensive to ... Keywords: System testing, Web of data, realistic test input

Leonardo Mariani; Mauro Pezzč; Oliviero Riganelli; Mauro Santoro

2014-07-01T23:59:59.000Z

342

Electrical Metering Equipment and Sensors Appendix D -Electrical Metering Equipment and Sensors  

E-Print Network [OSTI]

Appendix D ­ Electrical Metering Equipment and Sensors #12;D.1 Appendix D - Electrical Metering schedules, and view system status from the convenience of a standard web-browser. D.2 Metering Data Logger

343

The LSST Data Mining Research Agenda  

E-Print Network [OSTI]

We describe features of the LSST science database that are amenable to scientific data mining, object classification, outlier identification, anomaly detection, image quality assurance, and survey science validation. The data mining research agenda includes: scalability (at petabytes scales) of existing machine learning and data mining algorithms; development of grid-enabled parallel data mining algorithms; designing a robust system for brokering classifications from the LSST event pipeline (which may produce 10,000 or more event alerts per night); multi-resolution methods for exploration of petascale databases; indexing of multi-attribute multi-dimensional astronomical databases (beyond spatial indexing) for rapid querying of petabyte databases; and more.

K. D. Borne; J. Becla; I. Davidson; A. Szalay; J. A. Tyson

2008-11-02T23:59:59.000Z

344

Injury experience in coal mining, 1991  

SciTech Connect (OSTI)

This Mine Safety and Health Administration (MSHA) informational report reviews in detail the occupational injury and illness experience of coal mining in the United States for 1991. Data reported by operators of mining establishments concerning work injuries are summarized by work location, accident classification, part of body injured, nature of injury, occupation, and anthracite or bituminous coal. Related information on employment, worktime, and operating activity also is presented. Data reported by independent contractors performing certain work at mining locations are depicted separately in this report. For ease of comparison between coal mining and the metal and nonmetal mineral mining industries, summary reference tabulations are included at the end of both the operator and the contractor sections of this report. Data used in compiling this report were reported by operators of coal mines and preparation plants on a mandatory basis as required under the Federal Mine Safety and Health Act of 1977, Public Law 91-173,as amended by Public Law 95-164. Since January 1, 1978, operators of mines or preparation plants or both which are subject to the Act have been required under 30 CFR, Part 50, to submit reports of injuries, occupational illnesses, and related data.

Not Available

1991-12-31T23:59:59.000Z

345

Cumulative impacts of mountaintop mining on an Appalachian watershed  

Science Journals Connector (OSTI)

...Valley Fills in Appalachia:Final Programmatic...of mountaintop coal mining: Comparing biological...2010 ) Mountaintop mining consequences . Science...mountaintop/valley fill coal mining. Appendix D...Valley Fills in Appalachia:Draft Programmatic...

T. Ty Lindberg; Emily S. Bernhardt; Raven Bier; A. M. Helton; R. Brittany Merola; Avner Vengosh; Richard T. Di Giulio

2011-01-01T23:59:59.000Z

346

Strip Mining (II): TVA in Middle in Reclamation Controversy  

Science Journals Connector (OSTI)

...sponsored by the coal industry, Robert...the Appalachian coal fields." Opponents of strip mining will con-tinue...to write. The Appalachia Act, which has...economics of strip mining-particularly...Ap-praisal of Coal Strip Mining...

John Walsh

1965-10-08T23:59:59.000Z

347

Ground Water Basin Management at the Neyveli Lignite Mines  

Science Journals Connector (OSTI)

The Neyveli lignite mines of India contain large reserves and represent a unique mining venture in...2...hydrogeological basin in which these mines lie contain multiple aquifers under hydrostatic pressure. There ...

V. Ravi Kumar; S. N. Sahay; N. Periasamy; S. Shiv Prasad…

2010-04-01T23:59:59.000Z

348

T-623: HP Business Availability Center Input Validation Hole Permits  

Broader source: Energy.gov (indexed) [DOE]

3: HP Business Availability Center Input Validation Hole 3: HP Business Availability Center Input Validation Hole Permits Cross-Site Scripting Attacks T-623: HP Business Availability Center Input Validation Hole Permits Cross-Site Scripting Attacks May 16, 2011 - 3:05pm Addthis PROBLEM: A vulnerability was reported in HP Business Availability Center. A remote user can conduct cross-site scripting attacks. PLATFORM: HP Business Availability Center software 8.06 and prior versions ABSTRACT: The software does not properly filter HTML code from user-supplied input before displaying the input. reference LINKS: SecurityTracker Alert ID:1025535 HP Knowledge Base CVE-2011-1856 Secunia ID: SA44569 HP Document ID:c02823184 | ESB-2011.0525 IMPACT ASSESSMENT: High Discussion: A remote user can cause arbitrary scripting code to be executed by the

349

Sample Environment Equipment Categories - ORNL Neutron Sciences  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Home › Instruments › Sample Environment Home › Instruments › Sample Environment Sample Environment: Categories of Equipment All Ancillary Equipment Auto Changer Closed Cycle Refrigerators Closed Cycle Refrigerators - Bottom Loading Closed Cycle Refrigerators - Top Loading Furnaces Gas Handling Gas Panel High Pressure Systems Liquid Helium Cryostats Magnet Systems Other Special Environments Sample Cell Sample Stick Ultra Low Temperature Devices Sample Environment: by Beam Line All BL-11A-POWGEN BL-11B-MANDI BL-12-TOPAZ BL-13-Fundamental Neutron Physics Beam Line BL-14A-BL-14A BL-14B-HYSPEC BL-15-Neutron Spin Echo (NSE) BL-16B-VISION BL-17-SEQUOIA BL-18-ARCS BL-1A-TOF-USANS BL-1B-NOMAD BL-2-BASIS BL-3-SNAP BL-4A-Magnetism Reflectometer BL-4B-Liquids Reflectometer BL-5-Cold Neutron Chopper Spectrometer (CNCS) BL-6-EQ-SANS

350

Laboratory Equipment Donation Program - Guidelines/FAQ  

Office of Scientific and Technical Information (OSTI)

Frequently Asked Questions Frequently Asked Questions Who is eligible to apply for equipment? Due to budget constraints, the free shipping program for "high need schools" has been discontinued; and middle and high schools are no longer eligible to participate in the Laboratory Equipment Donation Program (LEDP) program. Participation in the LEDP is limited to accredited, post graduate, degree granting institutions including universities, colleges, junior colleges, technical institutes, museums, or hospitals, located in the U.S. and interested in establishing or upgrading energy-oriented educational programs in the life, physical, and environmental sciences and in engineering is eligible to apply. An energy-oriented program is defined as an academic research activity dealing primarily or entirely in

351

Process Equipment Cost Estimation, Final Report  

Office of Scientific and Technical Information (OSTI)

Process Equipment Cost Estimation Process Equipment Cost Estimation Final Report January 2002 H.P. Loh U.S. Department of Energy National Energy Technology Laboratory P.O. Box 10940, 626 Cochrans Mill Road Pittsburgh, PA 15236-0940 and P.O. Box 880, 3610 Collins Ferry Road Morgantown, WV 26507-0880 and Jennifer Lyons and Charles W. White, III EG&G Technical Services, Inc. 3604 Collins Ferry Road, Suite 200 Morgantown, WV 26505 DOE/NETL-2002/1169 ii Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus,

352

Documentation Requirements for Pressurized Experiment Equipment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Documentation Requirements for Pressurized Experiment Apparatus Documentation Requirements for Pressurized Experiment Apparatus PSSC NOTE01 15-Jan-2013 When bringing a piece of apparatus to the APS for an experiment that will involve pressure, whether it is to be used on a beamline during a measurement or in a laboratory to prepare the sample prior to the experiment, the hazards associated with the equipment must be reviewed. To review the equipment and make any recommendations, a certain level of documentation must be provided by the experimenter. The length and depth of the documentation should be commensurate with the complexity of the system. 1. Description of apparatus a. Description of the assembly and operation of the system. b. State the maximum working pressure, working fluid (liquid or gas) used to

353

BCM 1 Equipment Inventory | Sample Preparation Laboratories  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 Equipment Inventory 1 Equipment Inventory « Biology Chemistry & Material Science Laboratory 1 Title Equipment Type Description Agilent 8453 UV-Vis Spectrophotometer Analytical Agilent 8453 UV-VIS diode-array spectrophotometer. Wavelength range 190-1100 nm with a 1 nm optical slit width. Disposable plastic cuvettes are available in the lab, and quartz cuvettes and microcuvettes are available on a check-out basis. Beckman GPKR Centrifuge Centrifuge Beckman GPKR refrigerated centrifuge with fixed angle rotor, 8000 rpm max speed, temperature range -10°C to 40°C, fits 50mL tubes. Corning 430 pH Meter pH Meter The Corning 430 pH meter is designed to handle laboratory applications from the most routine to the highly complex. Encased in spill-resistant housings and feature chemical-resistant, sealed keypad. Model 430 (pH range 0.00 to 14.00) is a basic, yet reliable meter providing accurate, efficient digital measurements. Offers simplified, four-button operation, automatic calibration and temperature compensation, % slope readout, self-diagnostics test on powerup and analog recorder output. Unique LCD shows pH, mV

354

Plant design: Integrating Plant and Equipment Models  

SciTech Connect (OSTI)

Like power plant engineers, process plant engineers must design generating units to operate efficiently, cleanly, and profitably despite fluctuating costs for raw materials and fuels. To do so, they increasingly create virtual plants to enable evaluation of design concepts without the expense of building pilot-scale or demonstration facilities. Existing computational models describe an entire plant either as a network of simplified equipment models or as a single, very detailed equipment model. The Advanced Process Engineering Co-Simulator (APECS) project (Figure 5) sponsored by the U.S. Department of Energy's National Energy Technology Laboratory (NETL) seeks to bridge the gap between models by integrating plant modeling and equipment modeling software. The goal of the effort is to provide greater insight into the performance of proposed plant designs. The software integration was done using the process-industry standard CAPE-OPEN (Computer Aided Process Engineering–Open), or CO interface. Several demonstration cases based on operating power plants confirm the viability of this co-simulation approach.

Sloan, David (Alstrom Power); Fiveland, Woody (Alstrom Power); Zitney, S.E.; Osawe, Maxwell (Ansys, Inc.)

2007-08-01T23:59:59.000Z

355

Alternative Fuels Data Center: Biodiesel Equipment and Fuel Tax Exemption  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Biodiesel Equipment Biodiesel Equipment and Fuel Tax Exemption to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Equipment and Fuel Tax Exemption on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Equipment and Fuel Tax Exemption on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Equipment and Fuel Tax Exemption on Google Bookmark Alternative Fuels Data Center: Biodiesel Equipment and Fuel Tax Exemption on Delicious Rank Alternative Fuels Data Center: Biodiesel Equipment and Fuel Tax Exemption on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Equipment and Fuel Tax Exemption on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Equipment and Fuel Tax Exemption

356

Alternative Fuels Data Center: Installing New E85 Equipment  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Installing New E85 Installing New E85 Equipment to someone by E-mail Share Alternative Fuels Data Center: Installing New E85 Equipment on Facebook Tweet about Alternative Fuels Data Center: Installing New E85 Equipment on Twitter Bookmark Alternative Fuels Data Center: Installing New E85 Equipment on Google Bookmark Alternative Fuels Data Center: Installing New E85 Equipment on Delicious Rank Alternative Fuels Data Center: Installing New E85 Equipment on Digg Find More places to share Alternative Fuels Data Center: Installing New E85 Equipment on AddThis.com... More in this section... Ethanol Basics Benefits & Considerations Stations Locations Infrastructure Development Business Case Equipment Options Equipment Installation Codes, Standards, & Safety Vehicles Laws & Incentives

357

Alternative Fuels Data Center: Biofuel Blending Equipment Tax Exemption  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Blending Blending Equipment Tax Exemption to someone by E-mail Share Alternative Fuels Data Center: Biofuel Blending Equipment Tax Exemption on Facebook Tweet about Alternative Fuels Data Center: Biofuel Blending Equipment Tax Exemption on Twitter Bookmark Alternative Fuels Data Center: Biofuel Blending Equipment Tax Exemption on Google Bookmark Alternative Fuels Data Center: Biofuel Blending Equipment Tax Exemption on Delicious Rank Alternative Fuels Data Center: Biofuel Blending Equipment Tax Exemption on Digg Find More places to share Alternative Fuels Data Center: Biofuel Blending Equipment Tax Exemption on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biofuel Blending Equipment Tax Exemption Qualified equipment used for storing and blending petroleum-based fuel with

358

COST AND SCHEDULE FOR DRILLING AND MINING UNDERGROUND TEST FACILITIES  

E-Print Network [OSTI]

Waste Storage in Mined Caverns in Crystalline Rock, LBL-Waste Storage in Mined Caverns in Crystalline Rock, LBL-for additional shaft and cavern support and stabilization.

Lamb, D.W.

2013-01-01T23:59:59.000Z

359

Copper isotope fractionation in acid mine drainage. | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Copper isotope fractionation in acid mine drainage. Copper isotope fractionation in acid mine drainage. Abstract: We surveyed the Cu isotopic composition of primary minerals and...

360

Virginia Coal Surface Mining Control and Reclamation Act (Virginia)  

Broader source: Energy.gov [DOE]

This legislation implements the federal Surface Mining Control and Reclamation Act and establishes a statewide regulatory program for reclamation following coal surface mining activities. The...

Note: This page contains sample records for the topic "inputs mining equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

U.S. Mining Industry Energy Bandwidth Study  

Broader source: Energy.gov [DOE]

This bandwidth analysis report was conducted to assist the ITP Mining R&D program in identifying energy-saving opportunities in coal, metals, and mineral mining.

362

Reclamation of Land Used for Mineral Mining (Virginia)  

Broader source: Energy.gov [DOE]

This legislation aims to provide for the rehabilitation and conservation of land affected by the mining of minerals through proper planning, proper use of appropriate methods of mining,...

363

Mines Welcomes Middle School Students | Critical Materials Institute  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Science and Technology. The students spent the day at Mines to learn about Earth, energy, the environment, critical materials and mining. The students enjoyed a chemistry show...

364

Using Whole-House Field Tests to Empirically Derive Moisture Buffering Model Inputs  

SciTech Connect (OSTI)

Building energy simulations can be used to predict a building's interior conditions, along with the energy use associated with keeping these conditions comfortable. These models simulate the loads on the building (e.g., internal gains, envelope heat transfer), determine the operation of the space conditioning equipment, and then calculate the building's temperature and humidity throughout the year. The indoor temperature and humidity are affected not only by the loads and the space conditioning equipment, but also by the capacitance of the building materials, which buffer changes in temperature and humidity. This research developed an empirical method to extract whole-house model inputs for use with a more accurate moisture capacitance model (the effective moisture penetration depth model). The experimental approach was to subject the materials in the house to a square-wave relative humidity profile, measure all of the moisture transfer terms (e.g., infiltration, air conditioner condensate) and calculate the only unmeasured term: the moisture absorption into the materials. After validating the method with laboratory measurements, we performed the tests in a field house. A least-squares fit of an analytical solution to the measured moisture absorption curves was used to determine the three independent model parameters representing the moisture buffering potential of this house and its furnishings. Follow on tests with realistic latent and sensible loads showed good agreement with the derived parameters, especially compared to the commonly-used effective capacitance approach. These results show that the EMPD model, once the inputs are known, is an accurate moisture buffering model.

Woods, J.; Winkler, J.; Christensen, D.; Hancock, E.

2014-08-01T23:59:59.000Z

365

Direct Liquid Cooling for Electronic Equipment  

SciTech Connect (OSTI)

This report documents a demonstration of an electronic--equipment cooling system in the engineering prototype development stage that can be applied in data centers. The technology provides cooling by bringing a water--based cooling fluid into direct contact with high--heat--generating electronic components. This direct cooling system improves overall data center energy efficiency in three ways: High--heat--generating electronic components are more efficiently cooled directly using water, capturing a large portion of the total electronic equipment heat generated. This captured heat reduces the load on the less--efficient air--based data center room cooling systems. The combination contributes to the overall savings. The power consumption of the electronic equipment internal fans is significantly reduced when equipped with this cooling system. The temperature of the cooling water supplied to the direct cooling system can be much higher than that commonly provided by facility chilled water loops, and therefore can be produced with lower cooling infrastructure energy consumption and possibly compressor-free cooling. Providing opportunities for heat reuse is an additional benefit of this technology. The cooling system can be controlled to produce high return water temperatures while providing adequate component cooling. The demonstration was conducted in a data center located at Lawrence Berkeley National Laboratory in Berkeley, California. Thirty--eight servers equipped with the liquid cooling system and instrumented for energy measurements were placed in a single rack. Two unmodified servers of the same configuration, located in an adjacent rack, were used to provide a baseline. The demonstration characterized the fraction of heat removed by the direct cooling technology, quantified the energy savings for a number of cooling infrastructure scenarios, and provided information that could be used to investigate heat reuse opportunities. Thermal measurement data were used with data center energy use modeling software to estimate overall site energy use. These estimates show that an overall data center energy savings of approximately 20 percent can be expected if a center is retrofitted as specified in the models used. Increasing the portion of heat captured by this technology is an area suggested for further development.

Coles, Henry; Greenberg, Steve

2014-03-01T23:59:59.000Z

366

Blending mining and nuclear industries at the Waste Isolation Pilot Plant  

SciTech Connect (OSTI)

At the Waste Isolation Pilot Plant (WIPP) traditional procedures for underground mining activities have been significantly altered in order to assure underground safety and project adherence to numerous regulatory requirements. Innovative techniques have been developed for WIPP underground procedures, mining equipment, and operating environments. The mining emphasis at WIPP is upon the quality of the excavation, not (as in conventional mines) on the production of ore. The WIPP is a United States Department of Energy (DOE) project that is located 30 miles southeast of Carlsbad, New Mexico, where the nation's first underground engineered nuclear repository is being constructed. The WIPP site was selected because of its location amidst a 607 meter thick salt bed, which provides a remarkably stable rock formation for the permanent storage of nuclear waste. The underground facility is located 655 meters below the earth's surface, in the Salado formation, which comprises two-hundred million year old halites with minor amounts of clay and anhydrites. When completed, the WIPP underground facility will consist of two components: approximately 81 square kilometers of experimental areas, and approximately 405 square kilometers of repository. 3 figs.

Walls, J.R.

1990-01-01T23:59:59.000Z

367

Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE)  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Electric Vehicle Electric Vehicle Supply Equipment (EVSE) Rebate - Indiana Michigan Power to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Rebate - Indiana Michigan Power on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Rebate - Indiana Michigan Power on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Rebate - Indiana Michigan Power on Google Bookmark Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Rebate - Indiana Michigan Power on Delicious Rank Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Rebate - Indiana Michigan Power on Digg Find More places to share Alternative Fuels Data Center: Electric

368

Property Tax Assessment for Renewable Energy Equipment | Department of  

Broader source: Energy.gov (indexed) [DOE]

Property Tax Assessment for Renewable Energy Equipment Property Tax Assessment for Renewable Energy Equipment Property Tax Assessment for Renewable Energy Equipment < Back Eligibility Utility Savings Category Bioenergy Water Buying & Making Electricity Solar Wind Program Info State Arizona Program Type Property Tax Incentive Rebate Amount Renewable-energy equipment assessed at 20% of its depreciated cost Provider Arizona Department of Revenue Renewable energy equipment owned by utilities and other entities operating in Arizona is assessed at 20% of its depreciated cost for the purpose of determining property tax. "Renewable energy equipment" is defined as "electric generation facilities, electric transmission, electric distribution, gas distribution or combination gas and electric transmission

369

Alternative Fuels Data Center: Highway Electric Vehicle Supply Equipment  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Highway Electric Highway Electric Vehicle Supply Equipment (EVSE) Installation Requirements to someone by E-mail Share Alternative Fuels Data Center: Highway Electric Vehicle Supply Equipment (EVSE) Installation Requirements on Facebook Tweet about Alternative Fuels Data Center: Highway Electric Vehicle Supply Equipment (EVSE) Installation Requirements on Twitter Bookmark Alternative Fuels Data Center: Highway Electric Vehicle Supply Equipment (EVSE) Installation Requirements on Google Bookmark Alternative Fuels Data Center: Highway Electric Vehicle Supply Equipment (EVSE) Installation Requirements on Delicious Rank Alternative Fuels Data Center: Highway Electric Vehicle Supply Equipment (EVSE) Installation Requirements on Digg Find More places to share Alternative Fuels Data Center: Highway

370

Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) and  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Vehicle Vehicle Supply Equipment (EVSE) and Battery Exchange Station Regulations to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) and Battery Exchange Station Regulations on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) and Battery Exchange Station Regulations on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) and Battery Exchange Station Regulations on Google Bookmark Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) and Battery Exchange Station Regulations on Delicious Rank Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) and Battery Exchange Station Regulations on Digg Find More places to share Alternative Fuels Data Center: Electric

371

ITP Mining: Energy and Environmental Profile of the U.S. Mining Industry (December 2002)  

Broader source: Energy.gov (indexed) [DOE]

MINING MINING INDUSTRY OF THE FUTURE December 2002 ENERGY AND ENVIRONMENTAL PROFILE OF THE U.S. MINING INDUSTRY ENERGY AND ENVIRONMENTAL PROFILE OF THE U.S. MINING INDUSTRY December 2002 Prepared By: BCS, Incorporated Prepared for U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Preface The U.S. Department of Energy and the National Mining Association are working in partnership to implement the Mining Industry of the Future strategy. Cooperatively, the two organizations selected specific mineral commodities to review in the Mining Industry Profile. These mineral commodities selected are those that require significant energy to extract and prepare for a first saleable product, and have the potential for energy and environmental improvement through research and development. The eight groups of

372

Data mining for ontology development.  

SciTech Connect (OSTI)

A multi-laboratory ontology construction effort during the summer and fall of 2009 prototyped an ontology for counterfeit semiconductor manufacturing. This effort included an ontology development team and an ontology validation methods team. Here the third team of the Ontology Project, the Data Analysis (DA) team reports on their approaches, the tools they used, and results for mining literature for terminology pertinent to counterfeit semiconductor manufacturing. A discussion of the value of ontology-based analysis is presented, with insights drawn from other ontology-based methods regularly used in the analysis of genomic experiments. Finally, suggestions for future work are offered.

Davidson, George S.; Strasburg, Jana (Pacific Northwest National Laboratory, Richland, WA); Stampf, David (Brookhaven National Laboratory, Upton, NY); Neymotin,Lev (Brookhaven National Laboratory, Upton, NY); Czajkowski, Carl (Brookhaven National Laboratory, Upton, NY); Shine, Eugene (Savannah River National Laboratory, Aiken, SC); Bollinger, James (Savannah River National Laboratory, Aiken, SC); Ghosh, Vinita (Brookhaven National Laboratory, Upton, NY); Sorokine, Alexandre (Oak Ridge National Laboratory, Oak Ridge, TN); Ferrell, Regina (Oak Ridge National Laboratory, Oak Ridge, TN); Ward, Richard (Oak Ridge National Laboratory, Oak Ridge, TN); Schoenwald, David Alan

2010-06-01T23:59:59.000Z

373

Microsoft Word - DOE-ID-12-009 Colorado School of Mines.doc  

Broader source: Energy.gov (indexed) [DOE]

09 09 SECTION A. Project Title: Upgrades to the Colorado School of Mines Neutron Imaging Beam-Line SECTION B. Project Description The Colorado School Mines project has three objectives: - Upgrade CSM's Neutron Imaging Beam-Line, including the addition of several modular filters that will allow fine-tuning of the resulting neutron beam - Provide additional neutron detection and measurement equipment to allow direct measurement of the beam's neutron flux and energy spectrum by purchasing a gamma+ neutron handheld survey meter and a neutron cart and ball detector - Obtain the image conversion foils needed to conduct film-based neutron radiography SECTION C. Environmental Aspects / Potential Sources of Impact Radioactive Material Use - Moderate amounts of short-lived radioactive materials will be produced from neutron radiography.

374

High Performance Subgraph Mining in Molecular Compounds  

E-Print Network [OSTI]

High Performance Subgraph Mining in Molecular Compounds Giuseppe Di Fatta1,2 and Michael R data makes distributed graph mining techniques particularly relevant. In this paper, we present method has been evaluated on the well-known National Cancer Institute's HIV-screening dataset, where

Reiterer, Harald

375

Wavelength meter having single mode fiber optics multiplexed inputs  

DOE Patents [OSTI]

A wavelength meter having a single mode fiber optics input is disclosed. The single mode fiber enables a plurality of laser beams to be multiplexed to form a multiplexed input to the wavelength meter. The wavelength meter can provide a determination of the wavelength of any one or all of the plurality of laser beams by suitable processing. Another aspect of the present invention is that one of the laser beams could be a known reference laser having a predetermined wavelength. Hence, the improved wavelength meter can provide an on-line calibration capability with the reference laser input as one of the plurality of laser beams.

Hackel, R.P.; Paris, R.D.; Feldman, M.

1993-02-23T23:59:59.000Z

376

Wavelength meter having single mode fiber optics multiplexed inputs  

DOE Patents [OSTI]

A wavelength meter having a single mode fiber optics input is disclosed. The single mode fiber enables a plurality of laser beams to be multiplexed to form a multiplexed input to the wavelength meter. The wavelength meter can provide a determination of the wavelength of any one or all of the plurality of laser beams by suitable processing. Another aspect of the present invention is that one of the laser beams could be a known reference laser having a predetermined wavelength. Hence, the improved wavelength meter can provide an on-line calibration capability with the reference laser input as one of the plurality of laser beams.

Hackel, Richard P. (Livermore, CA); Paris, Robert D. (San Ramon, CA); Feldman, Mark (Pleasanton, CA)

1993-01-01T23:59:59.000Z

377

Assessing the cumulative impacts of surface mining and coal bed methane development on shallow aquifers in the Powder River Basin, Wyoming  

SciTech Connect (OSTI)

Large scale surface coal mining taken place along the cropline of the Wyodak-Anderson coal seam since approximately 1977. Groundwater impacts due to surface mining of coal and other energy-related development is a primary regulatory concern and an identified Office of Surface Mining deficiency in the Wyoming coal program. The modeled aquifers are the upper unit (coal) of the Paleocene Fort Union Formation and the overlying Eocene Wasatch Formation. A regional groundwater model covering 790 square miles was constructed using MODFLOW, to simulate the impacts from three surface coal mines and coal bed methane development occurring downdip. Assessing anisotropy of the coal aquifer, quality checking of in situ aquifer tests and database quality control were precursors to modelling. Geologic data was kriged to develop the structural model of the aquifers. A Geographic Information System (GIS) was utilized to facilitate storage, analysis, display, development of input modelling arrays and assessment of hydrologic boundaries. Model output presents the predicted impacts of likely development scenarios, including impacts from coal bed methane development and surface coal mining through anticipated life of mining, and surface mining impacts independent of gas development.

Peacock, K. [Dept. of Interior, Casper, WY (United States)

1997-12-31T23:59:59.000Z

378

WIPP Mine Rescue Team Wins, Retires Trophy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Wins, Retires Trophy Wins, Retires Trophy CARLSBAD, N.M., April 9, 2001 - For the third consecutive year, a Waste Isolation Pilot Plant (WIPP) mine rescue has team won the Southwestern Regional Mine Rescue Competition. The competition was April 5-6 at the Pecos River Village in Carlsbad. The WIPP Blue Mine Rescue team has been designated the best in New Mexico by winning the New Mexico State Mine Inspector's Traveling Trophy three years in a row to retire the trophy. Second place was awarded to FMC Corporation from Green River, Wyoming, while the WIPP Silver team placed third. Kevin Cummins of IMC-Kalium won first place in the benchman's competition. Joe Baca of the WIPP Blue Team won second place. Mine Rescue teams have been participating in this competition since 1981.

379

Mined land reclamation by biological reactivation  

SciTech Connect (OSTI)

A mine reclamation technique, developed in Europe, restores land to full productivity within two years without topsoil replacement. The method deliberately reestablishes within one year following mining, the required biological balance between microbes, enzymes, and trace elements in the rock spoil rather than waiting five or more years for natural processes to restore balance. The technique is called Biological Reactivation (BR). This paper discusses the feasibility of BR reclamation after surface mining operations in the US. Staff of the Ohio Mining and Mineral Resources Research Institute completed an OSM-sponsored research project on BR in which physical and chemical tests characterized 140 spoil samples obtained from 10 surface mining operations. Test results indicated that Biological Reactivation technology could be effectively applied, at least in the test areas sampled within Appalachia. Preliminary estimates make clear that the new technique reduces reclamation costs on prime farmland by approximately 95% compared to topsoil segregation and replacement methods.

Gozon, J.S.; Konya, C.J.; Lukovic, S.S.; Lundquist, R.G.; Olah, J.

1982-12-01T23:59:59.000Z

380

Testing terrorism theory with data mining  

Science Journals Connector (OSTI)

This research demonstrates the application of multiple data mining techniques to test theories of the macro-level causes of terrorism. The unique dataset is comprised of terrorist events and measures of social, political and economic contexts in 185 countries worldwide between the years 1970 and 2004. The theories are assessed using the iterative expert data mining (IEDM) methodology with classification mining and then association mining. The resulting 100 rules suggest that the level of democracy in a country is an integral part of the explanation for terrorism. This research shows that a multi-method data mining approach can be used to test competing theories in a discipline by analysing large, comprehensive datasets that capture multiple theories and include large numbers of records.

Anthony Scime; Gregg R. Murray; Lance Y. Hunter

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "inputs mining equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Equipment design guidance document for flammable gas waste storage tank new equipment  

SciTech Connect (OSTI)

This document is intended to be used as guidance for design engineers who are involved in design of new equipment slated for use in Flammable Gas Waste Storage Tanks. The purpose of this document is to provide design guidance for all new equipment intended for application into those Hanford storage tanks in which flammable gas controls are required to be addressed as part of the equipment design. These design criteria are to be used as guidance. The design of each specific piece of new equipment shall be required, as a minimum to be reviewed by qualified Unreviewed Safety Question evaluators as an integral part of the final design approval. Further Safety Assessment may be also needed. This guidance is intended to be used in conjunction with the Operating Specifications Documents (OSDs) established for defining work controls in the waste storage tanks. The criteria set forth should be reviewed for applicability if the equipment will be required to operate in locations containing unacceptable concentrations of flammable gas.

Smet, D.B.

1996-04-11T23:59:59.000Z

382

Emissions characteristics of modern oil heating equipment  

SciTech Connect (OSTI)

Over the last 10 years there have been some very interesting developments in oil heating. These include higher static pressure burners, air atomizing nozzles, low firing rate nozzles, low heat loss combustion chambers and condensing boilers and furnaces. The current data base on the emissions characteristics of oil-fired residential heating equipment is based primarily on data taken in the 1970's. The objective of the work described in this report is to evaluate the effects of recent developments in oil-fired equipment on emissions. Detailed emissions measurements have been made on a number of currently available residential oil burners and whole systems selected to represent recent development trends. Some additional data was taken with equipment which is in the prototype stage. These units are a prevaporizing burner and a retention head burner modified with an air atomizing nozzle. Measurements include No{sub x}, smoke numbers, CO, gas phase hydrocarbon emissions and particulate mass emission rates. Emissions of smoke, CO and hydrocarbons were found to be significantly greater under cyclic operation for all burners tested. Generally, particulate emission rates were found to be 3 to 4 times greater in cyclic operation than in steady state. Air atomized burners were found to be capable of operation at much lower excess air levels than pressure atomized burners without producing significant amounts of smoke. As burner performance is improved, either through air atomization or prevaporization of the fuel, there appears to be a general trend towards producing CO at lower smoke levels as excess air is decreased. The criteria of adjusting burners for trace smoke may need to be abandoned for advanced burners and replaced with an adjustment for specific excess air levels. 17 refs., 15 figs., 6 tabs.

Krajewski, R.; Celebi, Y.; Coughlan, R.; Butcher, T.; McDonald, R.J.

1990-07-01T23:59:59.000Z

383

Laboratory Equipment Donation Program - LEDP Widget Code  

Office of Scientific and Technical Information (OSTI)

Widget Inclusion Code Widget Inclusion Code Copy the code below and paste it to your website or blog: