Sample records for infrastructure project blue

  1. California Hydrogen Infrastructure Project

    SciTech Connect (OSTI)

    Edward C. Heydorn

    2013-03-12T23:59:59.000Z

    Air Products and Chemicals, Inc. has completed a comprehensive, multiyear project to demonstrate a hydrogen infrastructure in California. The specific primary objective of the project was to demonstrate a model of a ���¢��������real-world���¢������� retail hydrogen infrastructure and acquire sufficient data within the project to assess the feasibility of achieving the nation���¢��������s hydrogen infrastructure goals. The project helped to advance hydrogen station technology, including the vehicle-to-station fueling interface, through consumer experiences and feedback. By encompassing a variety of fuel cell vehicles, customer profiles and fueling experiences, this project was able to obtain a complete portrait of real market needs. The project also opened its stations to other qualified vehicle providers at the appropriate time to promote widespread use and gain even broader public understanding of a hydrogen infrastructure. The project engaged major energy companies to provide a fueling experience similar to traditional gasoline station sites to foster public acceptance of hydrogen. Work over the course of the project was focused in multiple areas. With respect to the equipment needed, technical design specifications (including both safety and operational considerations) were written, reviewed, and finalized. After finalizing individual equipment designs, complete station designs were started including process flow diagrams and systems safety reviews. Material quotes were obtained, and in some cases, depending on the project status and the lead time, equipment was placed on order and fabrication began. Consideration was given for expected vehicle usage and station capacity, standard features needed, and the ability to upgrade the station at a later date. In parallel with work on the equipment, discussions were started with various vehicle manufacturers to identify vehicle demand (short- and long-term needs). Discussions included identifying potential areas most suited for hydrogen fueling stations with a focus on safe, convenient, fast-fills. These potential areas were then compared to and overlaid with suitable sites from various energy companies and other potential station operators. Work continues to match vehicle needs with suitable fueling station locations. Once a specific site was identified, the necessary agreements could be completed with the station operator and expected station users. Detailed work could then begin on the site drawings, permits, safety procedures and training needs. Permanent stations were successfully installed in Irvine (delivered liquid hydrogen), Torrance (delivered pipeline hydrogen) and Fountain Valley (renewable hydrogen from anaerobic digester gas). Mobile fueling stations were also deployed to meet short-term fueling needs in Long Beach and Placerville. Once these stations were brought online, infrastructure data was collected and reported to DOE using Air Products���¢�������� Enterprise Remote Access Monitoring system. Feedback from station operators was incorporated to improve the station user���¢��������s fueling experience.

  2. Infrastructure Projects | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHigh SchoolIn Other News link toInfluenceInfrared MappingInfrastructure

  3. EA-1746: Blue Mountain Geothermal Development Project, Humboldt...

    Broader source: Energy.gov (indexed) [DOE]

    December 3, 2007 EA-1746: Final Environmental Assessment Blue Mountain Geothermal Development Project April 26, 2010 EA-1746: Finding of No Significant Impact Blue Mountain...

  4. Near-Site Transportation Infrastructure Project

    SciTech Connect (OSTI)

    Viebrock, J.M.; Mote, N. (Nuclear Assurance Corp., Norcross, GA (United States)) [Nuclear Assurance Corp., Norcross, GA (United States)

    1992-02-01T23:59:59.000Z

    There are 122 commercial nuclear facilities from which spent nuclear fuel will be accepted by the Federal Waste Management System (FWMS). Since some facilities share common sites and some facilities are on adjacent sites, 76 sites were identified for the Near-Site Transportation Infrastructure (NSTI) project. The objective of the NSTI project was to identify the options available for transportation of spent-fuel casks from each of these commercial nuclear facility sites to the main transportation routes -- interstate highways, commercial rail lines and navigable waterways available for commercial use. The near-site transportation infrastructure from each site was assessed, based on observation of technical features identified during a survey of the routes and facilities plus data collected from referenced information sources. The potential for refurbishment of transportation facilities which are not currently operational was also assessed, as was the potential for establishing new transportation facilities.

  5. Controlled Hydrogen Fleet and Infrastructure Demonstration Project

    SciTech Connect (OSTI)

    Dr. Scott Staley

    2010-03-31T23:59:59.000Z

    This program was undertaken in response to the US Department of Energy Solicitation DE-PS30-03GO93010, resulting in this Cooperative Agreement with the Ford Motor Company and BP to demonstrate and evaluate hydrogen fuel cell vehicles and required fueling infrastructure. Ford initially placed 18 hydrogen fuel cell vehicles (FCV) in three geographic regions of the US (Sacramento, CA; Orlando, FL; and southeast Michigan). Subsequently, 8 advanced technology vehicles were developed and evaluated by the Ford engineering team in Michigan. BP is Ford's principal partner and co-applicant on this project and provided the hydrogen infrastructure to support the fuel cell vehicles. BP ultimately provided three new fueling stations. The Ford-BP program consists of two overlapping phases. The deliverables of this project, combined with those of other industry consortia, are to be used to provide critical input to hydrogen economy commercialization decisions by 2015. The program's goal is to support industry efforts of the US President's Hydrogen Fuel Initiative in developing a path to a hydrogen economy. This program was designed to seek complete systems solutions to address hydrogen infrastructure and vehicle development, and possible synergies between hydrogen fuel electricity generation and transportation applications. This project, in support of that national goal, was designed to gain real world experience with Hydrogen powered Fuel Cell Vehicles (H2FCV) 'on the road' used in everyday activities, and further, to begin the development of the required supporting H2 infrastructure. Implementation of a new hydrogen vehicle technology is, as expected, complex because of the need for parallel introduction of a viable, available fuel delivery system and sufficient numbers of vehicles to buy fuel to justify expansion of the fueling infrastructure. Viability of the fuel structure means widespread, affordable hydrogen which can return a reasonable profit to the fuel provider, while viability of the vehicle requires an expected level of cost, comfort, safety and operation, especially driving range, that consumers require. This presents a classic 'chicken and egg' problem, which Ford believes can be solved with thoughtful implementation plans. The eighteen Ford Focus FCV vehicles that were operated for this demonstration project provided the desired real world experience. Some things worked better than expected. Most notable was the robustness and life of the fuel cell. This is thought to be the result of the full hybrid configuration of the drive system where the battery helps to overcome the performance reduction associated with time related fuel cell degradation. In addition, customer satisfaction surveys indicated that people like the cars and the concept and operated them with little hesitation. Although the demonstrated range of the cars was near 200 miles, operators felt constrained because of the lack of a number of conveniently located fueling stations. Overcoming this major concern requires overcoming a key roadblock, fuel storage, in a manner that permits sufficient quantity of fuel without sacrificing passenger or cargo capability. Fueling infrastructure, on the other hand, has been problematic. Only three of a planned seven stations were opened. The difficulty in obtaining public approval and local government support for hydrogen fuel, based largely on the fear of hydrogen that grew from past disasters and atomic weaponry, has inhibited progress and presents a major roadblock to implementation. In addition the cost of hydrogen production, in any of the methodologies used in this program, does not show a rapid reduction to commercially viable rates. On the positive side of this issue was the demonstrated safety of the fueling station, equipment and process. In the Ford program, there were no reported safety incidents.

  6. Infrastructure and Operations Improvement Project Director |...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    project risks. -Ensure that required and effective project management and control systems are developed, deployed and implemented to successfully manage and assess the project...

  7. Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project

    SciTech Connect (OSTI)

    Stottler, Gary

    2012-02-08T23:59:59.000Z

    General Motors, LLC and energy partner Shell Hydrogen, LLC, deployed a system of hydrogen fuel cell electric vehicles integrated with a hydrogen fueling station infrastructure to operate under real world conditions as part of the U.S. Department of Energy's Controlled Hydrogen Fleet and Infrastructure Validation and Demonstration Project. This technical report documents the performance and describes the learnings from progressive generations of vehicle fuel cell system technology and multiple approaches to hydrogen generation and delivery for vehicle fueling.

  8. AVTA: ARRA EV Project Annual Infrastructure Reports

    Broader source: Energy.gov [DOE]

    These reports summarize charging behavior of drivers that participated in the EV Project, which deployed 14,000 Level 2 PEV chargers and 300 fast chargers.

  9. Siemens Global Studio Project: Experiences Adopting an Integrated GSD Infrastructure

    E-Print Network [OSTI]

    Herbsleb, James D.

    Siemens Global Studio Project: Experiences Adopting an Integrated GSD Infrastructure Mullick, N., Bass, M., El Houda, Z., and Paulish, D.J. Siemens Corporate Research, Inc Princeton, NJ Neel.Mullick, Matthew.Bass, Daniel.Paulish @Siemens.com Cataldo, M. and Herbsleb, J.D. Institute for Software Research

  10. Tank waste remediation system privatization phase 1 infrastructure project W-519, project execution plan

    SciTech Connect (OSTI)

    Parazin, R.J.

    1998-08-28T23:59:59.000Z

    This Project Execution Plan (PEP) defines the overall strategy, objectives, and contractor management requirements for the execution phase of Project W-519 (98-D403), Privatization Phase 1 Infrastructure Support, whose mission is to effect the required Hanford site infrastructure physical changes to accommodate the Privatization Contractor facilities. This plan provides the project scope, project objectives and method of performing the work scope and achieving objectives. The plan establishes the work definitions, the cost goals, schedule constraints and roles and responsibilities for project execution. The plan also defines how the project will be controlled and documented.

  11. Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Fall 2008

    SciTech Connect (OSTI)

    Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.

    2008-10-01T23:59:59.000Z

    Graphs of composite data products produced by DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation project through September 2008.

  12. Near-Site Transportation Infrastructure Project. Final report

    SciTech Connect (OSTI)

    Viebrock, J.M.; Mote, N. [Nuclear Assurance Corp., Norcross, GA (United States)] [Nuclear Assurance Corp., Norcross, GA (United States)

    1992-02-01T23:59:59.000Z

    There are 122 commercial nuclear facilities from which spent nuclear fuel will be accepted by the Federal Waste Management System (FWMS). Since some facilities share common sites and some facilities are on adjacent sites, 76 sites were identified for the Near-Site Transportation Infrastructure (NSTI) project. The objective of the NSTI project was to identify the options available for transportation of spent-fuel casks from each of these commercial nuclear facility sites to the main transportation routes -- interstate highways, commercial rail lines and navigable waterways available for commercial use. The near-site transportation infrastructure from each site was assessed, based on observation of technical features identified during a survey of the routes and facilities plus data collected from referenced information sources. The potential for refurbishment of transportation facilities which are not currently operational was also assessed, as was the potential for establishing new transportation facilities.

  13. Project Information Form Project Title Potential to Build Current Natural Gas Infrastructure to Accommodate

    E-Print Network [OSTI]

    California at Davis, University of

    Project Information Form Project Title Potential to Build Current Natural Gas Infrastructure Project Natural gas is often touted as a `bridge' to low carbon fuels in the heavy duty transportation sector, and the number of natural gas-fueled medium and heavy-duty fleets is growing rapidly. Research

  14. AVTA: ARRA EV Project Charging Infrastructure Data Summary Reports

    Broader source: Energy.gov [DOE]

    The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The American Recovery and Reinvestment Act supported a number of projects that together made up the largest ever deployment of plug-in electric vehicles and charging infrastructure in the U.S. The following reports summarize data collected from the 14,000 Level 2 PEV chargers and 300 DC fast chargers deployed by the EV Project. It also deployed 5,700 all-electric Nissan Leafs and 2,600 plug-in hybrid electric Chevrolet Volts. Background data on how this data was collected is in the EV Project: About the Reports. This research was conducted by Idaho National Laboratory.

  15. USD 384 Blue Valley Wind Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTri Global Energy LLC Place: Dallas,UGIURDB Ell-Saline Wind Project684 Blue

  16. ESTIMATING RISK TO CALIFORNIA ENERGY INFRASTRUCTURE FROM PROJECTED CLIMATE CHANGE

    SciTech Connect (OSTI)

    Sathaye, Jayant; Dale, Larry; Larsen, Peter; Fitts, Gary; Koy, Kevin; Lewis, Sarah; Lucena, Andre

    2011-06-22T23:59:59.000Z

    This report outlines the results of a study of the impact of climate change on the energy infrastructure of California and the San Francisco Bay region, including impacts on power plant generation; transmission line and substation capacity during heat spells; wildfires near transmission lines; sea level encroachment upon power plants, substations, and natural gas facilities; and peak electrical demand. Some end-of-century impacts were projected:Expected warming will decrease gas-fired generator efficiency. The maximum statewide coincident loss is projected at 10.3 gigawatts (with current power plant infrastructure and population), an increase of 6.2 percent over current temperature-induced losses. By the end of the century, electricity demand for almost all summer days is expected to exceed the current ninetieth percentile per-capita peak load. As much as 21 percent growth is expected in ninetieth percentile peak demand (per-capita, exclusive of population growth). When generator losses are included in the demand, the ninetieth percentile peaks may increase up to 25 percent. As the climate warms, California's peak supply capacity will need to grow faster than the population.Substation capacity is projected to decrease an average of 2.7 percent. A 5C (9F) air temperature increase (the average increase predicted for hot days in August) will diminish the capacity of a fully-loaded transmission line by an average of 7.5 percent.The potential exposure of transmission lines to wildfire is expected to increase with time. We have identified some lines whose probability of exposure to fire are expected to increase by as much as 40 percent. Up to 25 coastal power plants and 86 substations are at risk of flooding (or partial flooding) due to sea level rise.

  17. Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project Pre-Solicitation Meeting: Questions and Answers

    Broader source: Energy.gov [DOE]

    Questions and answers from the pre-solicitation meeting for the Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project held March 19, 2003, in Southfield, Michigan.

  18. Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project Pre-Solicitation Meeting: Supporting Information

    Broader source: Energy.gov [DOE]

    Supporting information and objectives for the pre-solicitation meeting for the Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project held March 19, 2003 in Southfield, Michigan.

  19. Data Management Plan for The Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project

    Broader source: Energy.gov [DOE]

    The Data Management Plan describes how DOE will handle data submitted by recipients as deliverables under the Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project.

  20. Status of U.S. FCEV and Infrastructure Learning Demonstration Project (Presentation)

    SciTech Connect (OSTI)

    Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Ainscough, C.; Saur, G.

    2011-03-01T23:59:59.000Z

    Presented at the Japan Hydrogen and Fuel Cell Demonstration Project (JHFC), 1 March 2011, Tokyo, Japan. This presentation summarizes the status of U.S. fuel cell electric vehicles and infrastructure learning demonstration project.

  1. ESTIMATING RISK TO CALIFORNIA ENERGY INFRASTRUCTURE FROM PROJECTED CLIMATE CHANGE

    E-Print Network [OSTI]

    Sathaye, Jayant

    2011-01-01T23:59:59.000Z

    infrastructure includes the state’s natural gas-fired power generation facilities, electricinfrastructure includes the state’s natural gas-fired power generation facilities, electric

  2. Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Spring 2009; Composite Data Products, Final Version March 19, 2009

    SciTech Connect (OSTI)

    Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.

    2009-03-01T23:59:59.000Z

    Graphs of composite data products produced by DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation project through March 2009.

  3. Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Fall 2009; Composite Data Products, Final Version September 11, 2009

    SciTech Connect (OSTI)

    Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.

    2009-09-01T23:59:59.000Z

    Graphs of composite data products produced by DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation project through September 2009.

  4. Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Spring 2010; Composite Data Products, Final Version March 29, 2010

    SciTech Connect (OSTI)

    Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.

    2010-05-01T23:59:59.000Z

    Graphs of composite data products produced by DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation project through March 2010.

  5. A synthesis of the "Ecological Effects of Reservoir Operations at Blue Mesa Reservoir" Project

    E-Print Network [OSTI]

    A synthesis of the "Ecological Effects of Reservoir Operations at Blue Mesa Reservoir" Project June 2005 #12;2 RECLAMATION A synthesis of the "Ecological Effects of Reservoir Operations at Blue Mesa), happy angler with a nice catch of kokanee (B. Johnson), CSU students doing vertical gill net survey (B

  6. Blue carbon storage potential of marine carbonate deposits Project reference IAP/13/50. Please quote this reference when applying.

    E-Print Network [OSTI]

    Guo, Zaoyang

    IAPETUS Blue carbon storage potential of marine carbonate deposits Project reference IAP/13 Henrik Stahl, Scottish Association for Marine Science Key Words 1. Blue carbon 2. Carbonate 3. Coralline is referred to as `blue carbon' to differentiate it from terrestrial carbon stores. Known blue carbon sinks

  7. Structure finance for hybrid infrastructure models : the application of project finance into public-private partnerships for the construction and operation of infrastructure

    E-Print Network [OSTI]

    Patramanis, Theodoros

    2006-01-01T23:59:59.000Z

    This thesis studies the application of project finance as the most efficient financing method for the construction and operation of infrastructure projects such as motorways, airports, power plants, pipelines, wastewater/sewage ...

  8. Webinar: Overview of the Hydrogen Fueling Infrastructure Research and Station Technology (H2FIRST) Project

    Broader source: Energy.gov [DOE]

    Text version and video recording of the webinar titled "An Overview of the Hydrogen Fueling Infrastructure Research and Station Technology (H2FIRST) Project," originally presented on November 18, 2014.

  9. Webinar: An Overview of the Hydrogen Fueling Infrastructure Research and Station Technology (H2FIRST) Project

    Broader source: Energy.gov [DOE]

    The Energy Department will present a live webinar entitled "An Overview of the Hydrogen Fueling Infrastructure Research and Station Technology (H2FIRST) Project" on Tuesday, November 18, from 12:00...

  10. Pre-solicitation Meeting for the Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project

    Broader source: Energy.gov [DOE]

    This presentation was given to attendees of the Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project pre-solicitation meeting held in Detroit, Michigan, on March 19, 2003.

  11. Project no.: IST-FP6-STREP -027513 Project full title: Critical Utility InfrastructurAL Resilience

    E-Print Network [OSTI]

    Neves, Nuno

    to the hybrid composition of those infrastructures: operational network, called generically SCADA, devoted unwittingly, the SCADA network is sometimes connected to. In consequence, in scientific terms, our problem can systems problem including interconnected SCADA/embedded networks, corporate intranets, and Internet

  12. Hydrogen Fueling Systems and Infrastructure

    E-Print Network [OSTI]

    ;Projects Hydrogen Infrastructure Development · Turnkey Commercial Hydrogen Fueling Station · Autothermal

  13. Application of Social Impact Bonds in Built Infrastructure Sustainability Projects

    E-Print Network [OSTI]

    White, Robert Joseph

    2014-05-01T23:59:59.000Z

    Results: Total Energy Reduction ........ 84 Figure 25: TAMU-Siemens Project Demand Side ........................................................... 85 Figure 26: Univaiate Sensitivity Analysis for Fraction of Savings used to restore Sustainability Fund... projects to their clientele. The Siemens Corporation is an example of an ESCO and the Texas A&M University (TAMU), is an example of a client. TAMU and Siemens have entered into an agreement for Siemens to guarantee savings from sustainable improvement...

  14. An Infrastructure Project for Climate Research in Europe OASIS3 User Guide

    E-Print Network [OSTI]

    PRISM An Infrastructure Project for Climate Research in Europe OASIS3 User Guide prism 2-5 Edited Acknowledgements 1 2 Introduction 3 2.1 Step-by-step use of OASIS3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 3 The OASIS3 sources 4 4 Interfacing a model with the PSMILe library 5 4.1 Initialisation

  15. A Software Infrastructure Project for Climate Research in Europe OASIS4 User Guide

    E-Print Network [OSTI]

    PRISM A Software Infrastructure Project for Climate Research in Europe OASIS4 User Guide (OASIS4 by sending an electronic mail to oasis4_help(at)lists.enes.org and as listed in Contact below. PRISM;Contents 1 Introduction 1 2 OASIS4 sources 3 2.1 Copyright Notice

  16. An Infrastructure Project for Climate Research in Europe OASIS3 User Guide

    E-Print Network [OSTI]

    Schmittner, Andreas

    PRISM An Infrastructure Project for Climate Research in Europe OASIS3 User Guide prism 2-5 Edited 3 2.1 Step-by-step use of OASIS3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 3 The OASIS3 sources 4 4 Interfacing a model with the PSMILe library 5 4.1 Initialisation

  17. Debt Capacity and Optimal Capital Structure for Privately-Financed Infrastructure Projects

    E-Print Network [OSTI]

    productivity, profitability, and private sector capital formation. He estimated, for example, that a 1 effective utilization of resources, when compared with the more flexible and cost conscious private sectorDebt Capacity and Optimal Capital Structure for Privately-Financed Infrastructure Projects

  18. Category:Smart Grid Projects - Advanced Metering Infrastructure | Open

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia:Power LPInformationCashtonGo BackLocation MediaGrant Projects

  19. NEUP Project Selections_September212011_IRP and Infrastructure Improvements

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy ChinaofSchaeferApril 1,(EAC)TABLEChallenges| Department of Energy Projects selections

  20. Sandia National Laboratories: Hydrogen Infrastructure

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hydrogen Infrastructure Widespread Hydrogen Fueling Infrastructure Is the Goal of H2FIRST Project On June 4, 2014, in Capabilities, Center for Infrastructure Research and...

  1. Project identification and evaluation techniques for transportation infrastructure : assessing their role in metropolitan areas of developing countries

    E-Print Network [OSTI]

    Kumar, Vimal, S.M. Massachusetts Institute of Technology

    2009-01-01T23:59:59.000Z

    Project identification and evaluation of transportation infrastructure play a vital role in shaping and sustaining the forms of cities all over the world. These cities differ substantially in character and urban form and ...

  2. Webinar November 18: An Overview of the Hydrogen Fueling Infrastructure Research and Station Technology (H2FIRST) Project

    Broader source: Energy.gov [DOE]

    The Energy Department will present a live webinar entitled "An Overview of the Hydrogen Fueling Infrastructure Research and Station Technology (H2FIRST) Project" on Tuesday, November 18, from 12:00 to 1:00 Eastern Standard Time (EST).

  3. Controlled Hydrogen Fleet and Infrastructure Demonstration and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project Solicitation Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project...

  4. Controlled Hydrogen Fleet and Infrastructure Demonstration and...

    Office of Environmental Management (EM)

    Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project 2009 DOE...

  5. Proposed IMS infrastructure improvement project, Seward, Alaska. Final environmental impact statement

    SciTech Connect (OSTI)

    Not Available

    1994-09-01T23:59:59.000Z

    This Environmental Impact Statement (EIS) examines a proposal for improvements at the existing University of Alaska, Fairbanks, Institute of Marine Science (IMS), Seward Marine Center. The Exxon Valdez Oil Spill (EVOS) Trustee Council is proposing to improve the existing research infrastructure to enhance the EVOS Trustee Council`s capabilities to study and rehabilitate marine mammals, marine birds, and the ecosystem injured by the Exxon Valdez oil spill. The analysis in this document focuses on the effects associated with construction and operation of the proposed project and its proposed alternatives. The EIS gives a detailed description of all major elements of the proposed project and its alternatives; identifies resources of major concern that were raised during the scoping process; describes the environmental background conditions of those resources; defines and analyzes the potential effects of the proposed project and its alternatives on these conditions; and identifies mitigating measures that are part of the project design as well as those proposed to minimize or reduce the adverse effects. Included in the EIS are written and oral comments received during the public comment period.

  6. Project Final Report: Building a Community Infrastructure for Scalable On-Line Performance Analysis Tools around Open|SpeedShop

    SciTech Connect (OSTI)

    Galarowicz, James

    2014-01-06T23:59:59.000Z

    In this project we created a community tool infrastructure for program development tools targeting Petascale class machines and beyond. This includes tools for performance analysis, debugging, and correctness tools, as well as tuning and optimization frameworks. The developed infrastructure provides a comprehensive and extensible set of individual tool building components. We started with the basic elements necessary across all tools in such an infrastructure followed by a set of generic core modules that allow a comprehensive performance analysis at scale. Further, we developed a methodology and workflow that allows others to add or replace modules, to integrate parts into their own tools, or to customize existing solutions. In order to form the core modules, we built on the existing Open|SpeedShop infrastructure and decomposed it into individual modules that match the necessary tool components. At the same time, we addressed the challenges found in performance tools for petascale systems in each module. When assembled, this instantiation of community tool infrastructure provides an enhanced version of Open|SpeedShop, which, while completely different in its architecture, provides scalable performance analysis for petascale applications through a familiar interface. This project also built upon and enhances capabilities and reusability of project partner components as specified in the original project proposal. The overall project team’s work over the project funding cycle was focused on several areas of research, which are described in the following sections. The reminder of this report also highlights related work as well as preliminary work that supported the project. In addition to the project partners funded by the Office of Science under this grant, the project team included several collaborators who contribute to the overall design of the envisioned tool infrastructure. In particular, the project team worked closely with the other two DOE NNSA laboratories Los Alamos and Sandia leveraging co-funding for Krell by ASC’s Common Computing Environment (CCE) program as laid out in the original proposal. The ASC CCE co-funding, coordinated through LLNL, was for 50% of the total project funding, with the ASC CCE portion of the funding going entirely to Krell, while the ASCR funding itself was split between Krell and the funded partners. This report covers the entire project from both funding sources. Additionally, the team leveraged the expertise of software engineering researchers from Carnegie Mellon University, who specialize in software framework design, in order to achieve a broadly acceptable component framework. The Component Based Tool Framework (CBTF) software has been released to the community. Information related to the project and the released software can be found on the CBTF wiki page at: http://sourceforge.net/p/cbtf/wiki/Home

  7. Sandia National Laboratories: Center for Infrastructure Research...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Infrastructure Research and Innovation Widespread Hydrogen Fueling Infrastructure Is the Goal of H2FIRST Project On June 4, 2014, in Capabilities, Center for Infrastructure...

  8. Final Technical Report: Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project

    SciTech Connect (OSTI)

    Ronald Grasman

    2011-12-31T23:59:59.000Z

    This report summarizes the work conducted under U.S. Department of Energy (DOE) under contract DE-FC36-04GO14285 by Mercedes-Benz & Research Development, North America (MBRDNA), Chrysler, Daimler, Mercedes Benz USA (MBUSA), BP, DTE Energy and NextEnergy to validate fuel cell technologies for infrastructure, transportation as well as assess technology and commercial readiness for the market. The Mercedes Team, together with its partners, tested the technology by operating and fueling hydrogen fuel cell vehicles under real world conditions in varying climate, terrain and driving conditions. Vehicle and infrastructure data was collected to monitor the progress toward the hydrogen vehicle and infrastructure performance targets of $2.00 to 3.00/gge hydrogen production cost and 2,000-hour fuel cell durability. Finally, to prepare the public for a hydrogen economy, outreach activities were designed to promote awareness and acceptance of hydrogen technology. DTE, BP and NextEnergy established hydrogen filling stations using multiple technologies for on-site hydrogen generation, storage and dispensing. DTE established a hydrogen station in Southfield, Michigan while NextEnergy and BP worked together to construct one hydrogen station in Detroit. BP constructed another fueling station in Burbank, California and provided a full-time hydrogen trailer at San Francisco, California and a hydrogen station located at Los Angeles International Airport in Southern, California. Stations were operated between 2005 and 2011. The Team deployed 30 Gen I Fuel Cell Vehicles (FCVs) in the beginning of the project. While 28 Gen I F-CELLs used the A-Class platform, the remaining 2 were Sprinter delivery vans. Fuel cell vehicles were operated by external customers for real-world operations in various regions (ecosystems) to capture various driving patterns and climate conditions (hot, moderate and cold). External operators consisted of F-CELL partner organizations in California and Michigan ranging from governmental organizations, for-profit to and non-profit entities. All vehicles were equipped with a data acquisition system that automatically collected statistically relevant data for submission to National Renewable Energy Laboratory (NREL), which monitored the progress of the fuel cell vehicles against the DOE technology validation milestones. The Mercedes Team also provided data from Gen-II vehicles under the similar operations as Gen I vehicles to compare technology maturity during program duration.

  9. EIS-0116: Blue River-Gore Pass Portion of the Hayden-Blue River Transmission Line Project

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Western Area Power Administration (WAPA) adopted this U.S. Department of Agriculture Rural Electrification Administration so that WAPA could supplement it in support of WAPA’s National Environmental Policy Act requirements for a related project.

  10. THE SIZE DIFFERENCE BETWEEN RED AND BLUE GLOBULAR CLUSTERS IS NOT DUE TO PROJECTION EFFECTS

    SciTech Connect (OSTI)

    Webb, Jeremy J.; Harris, William E.; Sills, Alison, E-mail: webbjj@mcmaster.ca [Department of Physics and Astronomy, McMaster University, Hamilton ON L8S 4M1 (Canada)

    2012-11-10T23:59:59.000Z

    Metal-rich (red) globular clusters in massive galaxies are, on average, smaller than metal-poor (blue) globular clusters. One of the possible explanations for this phenomenon is that the two populations of clusters have different spatial distributions. We test this idea by comparing clusters observed in unusually deep, high signal-to-noise images of M87 with a simulated globular cluster population in which the red and blue clusters have different spatial distributions, matching the observations. We compare the overall distribution of cluster effective radii as well as the relationship between effective radius and galactocentric distance for both the observed and simulated red and blue sub-populations. We find that the different spatial distributions does not produce a significant size difference between the red and blue sub-populations as a whole or at a given galactocentric distance. These results suggest that the size difference between red and blue globular clusters is likely due to differences during formation or later evolution.

  11. Part B: Project Summary ITR: A Scalable Enabling IT Infrastructure for Developing Regions (ICT4B)

    E-Print Network [OSTI]

    Mankoff, Jennifer

    , low-power devices, 2) a new approach to low-cost networking based on intermittent connectivity (rather for social science research. The expected 10-100 times reduction in device cost stems from the co times reduction in infrastructure cost comes largely from 1) the focus on intermittent networking, which

  12. Hydrogen Fueling Infrastructure Research and Station Technology...

    Broader source: Energy.gov (indexed) [DOE]

    An Overview of the Hydrogen Fueling Infrastructure Research and Station Technology (H2FIRST) Project" held on November 18, 2014. Hydrogen Fueling Infrastructure Research and...

  13. Infrastructure support for a waste management institute. Final project report, September 12, 1994--September 11, 1997

    SciTech Connect (OSTI)

    NONE

    1997-11-01T23:59:59.000Z

    North Carolina A and T State University has completed the development of an infrastructure for the interdisciplinary Waste Management Institute (WMI). The Interdisciplinary Waste Management Institute (WMI) was approved in June, 1994 by the General Administration of the University of North Carolina as an academic support unit with research and public service functions. The mission of the WMI is to enhance awareness and understanding of waste management issues and to provide instructional support including research and outreach. The goals of WMI are as follows: increase the number of minority professionals who will work in waste management fields; develop cooperative and exchange programs involving faculty, students, government, and industry; serve as institutional sponsor of public awareness workshops and lecture series; and support interdisciplinary research programs. The vision of the WMI is to provide continued state-of-the art environmental educational programs, research, and outreach.

  14. 1 INTRODUCTION Around the world people are busy with the realization of infrastructural projects. Different tasks

    E-Print Network [OSTI]

    Hack, Robert

    professionals involved in the project. Generally, these projects for the development of large civil- ated and meant to be (re-) used in this lifecycle and the main problem, as known today. This paper summarizes available meth- ods and software packages as used by different professionals

  15. Parallel digital forensics infrastructure.

    SciTech Connect (OSTI)

    Liebrock, Lorie M. (New Mexico Tech, Socorro, NM); Duggan, David Patrick

    2009-10-01T23:59:59.000Z

    This report documents the architecture and implementation of a Parallel Digital Forensics infrastructure. This infrastructure is necessary for supporting the design, implementation, and testing of new classes of parallel digital forensics tools. Digital Forensics has become extremely difficult with data sets of one terabyte and larger. The only way to overcome the processing time of these large sets is to identify and develop new parallel algorithms for performing the analysis. To support algorithm research, a flexible base infrastructure is required. A candidate architecture for this base infrastructure was designed, instantiated, and tested by this project, in collaboration with New Mexico Tech. Previous infrastructures were not designed and built specifically for the development and testing of parallel algorithms. With the size of forensics data sets only expected to increase significantly, this type of infrastructure support is necessary for continued research in parallel digital forensics. This report documents the implementation of the parallel digital forensics (PDF) infrastructure architecture and implementation.

  16. Stormwater management in Boston : to what extent are demonstration projects likely to enable citywide use of green infrastructure?

    E-Print Network [OSTI]

    Marks, Alex (Alex Corin)

    2014-01-01T23:59:59.000Z

    Green infrastructure (GI) has been increasingly recognized as the most effective approach for major cities to manage the environmental impacts of stormwater runoff. However, adoption of this infrastructure has yet to achieve ...

  17. Midwestern High-Level Radioactive Waste Transportation Project. Highway infrastructure report

    SciTech Connect (OSTI)

    Sattler, L.R.

    1992-02-01T23:59:59.000Z

    In addition to arranging for storage and disposal of radioactive waste, the US Department of Energy (DOE) must develop a safe and efficient transportation system in order to deliver the material that has accumulated at various sites throughout the country. The ability to transport radioactive waste safely has been demonstrated during the past 20 years: DOE has made over 2,000 shipments of spent fuel and other wastes without any fatalities or environmental damage related to the radioactive nature of the cargo. To guarantee the efficiency of the transportation system, DOE must determine the optimal combination of rail transport (which allows greater payloads but requires special facilities) and truck transport Utilizing trucks, in turn, calls for decisions as to when to use legal weight trucks or, if feasible, overweight trucks for fewer but larger shipments. As part of the transportation system, the Facility Interface Capability Assessment (FICA) study contributes to DOE`s development of transportation plans for specific facilities. This study evaluates the ability of different facilities to receive, load and ship the special casks in which radioactive materials will be housed during transport In addition, the DOE`s Near-Site Transportation Infrastructure (NSTI) study (forthcoming) will evaluate the rail, road and barge access to 76 reactor sites from which DOE is obligated to begin accepting spent fuel in 1998. The NSTI study will also assess the existing capabilities of each transportation mode and route, including the potential for upgrade.

  18. What kind of charging infrastructure do Chevrolet Volts Drivers in The EV Project use?

    SciTech Connect (OSTI)

    John Smart

    2013-09-01T23:59:59.000Z

    This report summarizes key conclusions from analysis of data collected from Chevrolet Volts participating in The EV Project. Topics include how much Volt drivers charge at level 1 vs. level 2 rates and how much they charge at home vs. away from home.

  19. What kind of charging infrastructure do Nissan Leaf drivers in The EV Project use?

    SciTech Connect (OSTI)

    Shawn Salisbury

    2014-09-01T23:59:59.000Z

    This document will describe the charging behavior of Nissan Leaf battery electric vehicles that were enrolled in the EV Project. It will include aggregated data from several thousand vehicles regarding time-of-day, power level, and location of charging and driving events. This document is a white paper that will be published on the INL AVTA website.

  20. Approved Members of the Indian Country Energy And Infrastructure...

    Broader source: Energy.gov (indexed) [DOE]

    INDIAN COUNTRY ENERGY AND INFRASTRUCTURE WORKING GROUP ICEIWG APPROVED MEMBERS Blue Lake Rancheria Jana Ganion, BLR Energy Director Confederated Tribes of the Warm Springs...

  1. Environmental Risks to Infrastructure 2014 Environmental Risks to Infrastructure Innovation funding call June 2014

    E-Print Network [OSTI]

    Reece, Sarah

    to Infrastructure 2014 NE/M008401/1 Dr Christian Wagner Towards managing risk from climate change throughRUM - Flood risk: Building Infrastructure Resilience through better Understanding and Management choices 8 2 To Infrastructure (CAVERTI) 7 8 NE/M008169/1 Dr Ana Mijic Improved techno-economic evaluation of Blue Green

  2. Innovative Financing for Green Infrastructure

    Office of Energy Efficiency and Renewable Energy (EERE)

    Topic OverviewFinancing green infrastructure is critical to taking projects from planning to implementation and beyond, including sustaining operations and maintenance. This 90-minute webcast will...

  3. The Araucaria Project. VLT spectra of blue supergiants in WLM: classification and first abundances

    E-Print Network [OSTI]

    Bresolin, F; Urbaneja, M A; Gieren, W; Kudritzki, R P; Venn, K A; Bresolin, Fabio; Pietrzynski, Grzegorz; Urbaneja, Miguel A.; Gieren, Wolfgang; Kudritzki, Rolf-Peter; Venn, Kim A.

    2006-01-01T23:59:59.000Z

    As part of the Araucaria Project, we present the first spectral catalog of supergiant stars in the Local Group dwarf irregular galaxy WLM. In assigning a spectral classification to these stars we accounted for the low metal content of WLM relative to the galactic standards used in the MK process, by using classification criteria developed for B and A supergiants contained in the Small Magellanic Cloud. Our spectral catalog shows that our higher S/N spectroscopic sample of 19 objects contains at least 6 early-B (B0-B5) supergiants and 6 late-B and early-A (B8-A2) stars of luminosity class between Ia and II, as well as an O7~V star and an O9.7 Ia star. The spectra of several of these stars is of sufficiently high quality for a determination of the stellar parameters and abundances. We have acquired also a second set of lower S/N spectra for mostly BA stars, however their quality does not allow a further analysis. We have carried out a quantitative analysis for three early-B supergiants. The mean oxygen abundanc...

  4. Integrating Customer Relationship Management and Project Lifecycle Management using Information Technology Infrastructure Library Techniques to Improve Service Delivery

    E-Print Network [OSTI]

    Millet, Sabbas

    2008-05-16T23:59:59.000Z

    -facing staff, and a platform for measuring product performance. ITIL (Information Technology Infrastructure Library) is a set of best practices, or body of knowledge, which describes all aspects of delivering IT services. ITIL Version 3 is used by the ISO...

  5. Webinar November 18: An Overview of the Hydrogen Fueling Infrastructur...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    18: An Overview of the Hydrogen Fueling Infrastructure Research and Station Technology (H2FIRST) Project Webinar November 18: An Overview of the Hydrogen Fueling Infrastructure...

  6. Blue Note

    ScienceCinema (OSTI)

    Murray Gibson

    2010-01-08T23:59:59.000Z

    Argonne's Murray Gibson is a physicist whose life's work includes finding patterns among atoms. The love of distinguishing patterns also drives Gibson as a musician and Blues enthusiast."Blue" notes are very harmonic notes that are missing from the equal temperament scale.The techniques of piano blues and jazz represent the melding of African and Western music into something totally new and exciting.

  7. Blue Note

    SciTech Connect (OSTI)

    Murray Gibson

    2007-04-27T23:59:59.000Z

    Argonne's Murray Gibson is a physicist whose life's work includes finding patterns among atoms. The love of distinguishing patterns also drives Gibson as a musician and Blues enthusiast."Blue" notes are very harmonic notes that are missing from the equal temperament scale.The techniques of piano blues and jazz represent the melding of African and Western music into something totally new and exciting.

  8. SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES ENISTAT: Experimental and

    E-Print Network [OSTI]

    SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES ENISTAT: Experimental-TA Project #12;SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES Partners (Users) · METU Ragueneau · SCHOECK (Germany): Steffen Scheer, Seref Diler #12;SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES

  9. MFC Communications Infrastructure Study

    SciTech Connect (OSTI)

    Michael Cannon; Terry Barney; Gary Cook; George Danklefsen, Jr.; Paul Fairbourn; Susan Gihring; Lisa Stearns

    2012-01-01T23:59:59.000Z

    Unprecedented growth of required telecommunications services and telecommunications applications change the way the INL does business today. High speed connectivity compiled with a high demand for telephony and network services requires a robust communications infrastructure.   The current state of the MFC communication infrastructure limits growth opportunities of current and future communication infrastructure services. This limitation is largely due to equipment capacity issues, aging cabling infrastructure (external/internal fiber and copper cable) and inadequate space for telecommunication equipment. While some communication infrastructure improvements have been implemented over time projects, it has been completed without a clear overall plan and technology standard.   This document identifies critical deficiencies with the current state of the communication infrastructure in operation at the MFC facilities and provides an analysis to identify needs and deficiencies to be addressed in order to achieve target architectural standards as defined in STD-170. The intent of STD-170 is to provide a robust, flexible, long-term solution to make communications capabilities align with the INL mission and fit the various programmatic growth and expansion needs.

  10. IDAHO BIODIESEL INFRASTRUCTURE PROJECT DOE'S INITIATIVE ON COOPERATIVE PROGRAMS WITH STATES FOR RESEARCH, DEVELOPMENT AND DEMONSTRATION GRANT NO. DE-FC36-02GO12021. Final report

    SciTech Connect (OSTI)

    CROCKETT, JOHN

    2006-12-31T23:59:59.000Z

    The Idaho Energy Division issued a Request for Proposal (RFP) on March 14, 2006, inviting qualified licensed fuel wholesalers, fuel retailers, and vehicle fleet operators to provide proposals to construct and/or install infrastructure for biodiesel utilization in Idaho. The intent was to improve the ability of private and/or non-Federal public entities in Idaho to store, transport, or offer for sale biodiesel within the state. The RFP provided up $100,000 for co-funding the projects with a minimum 50% cash cost match. Four contracts were subsequetnly awarded that resulted in three new bidodiesel storage facilities immediately serving about 45 fueling stations from Sandpoint to Boise. The project also attracted considerable media attention and Idaho became more knowledgeable about biodiesel.

  11. Social infrastructure

    E-Print Network [OSTI]

    Kurlbaum, Ryan E. (Ryan Edward)

    2013-01-01T23:59:59.000Z

    Current urbanization patterns and aging transportation infrastructures have marginalized millions of US citizens. The result is that 4 .5 million US residents live within 100 meters of a four-lane highway' and have become ...

  12. Development of a Network-Based Information Infrastructure for Fisheries and Hydropower Information in the Columbia River Basin : Final Project Report.

    SciTech Connect (OSTI)

    Scheibe, Timothy D.; Johnson, Gary E.; Perkins, Bill

    1997-05-01T23:59:59.000Z

    The goal of this project was to help develop technology and a unified structure to access and disseminate information related to the Bonneville Power Administration's fish and wildlife responsibility in the Pacific Northwest. BPA desires to increase access to, and exchange of, information produced by the Environment Fish, and Wildlife Group in concert with regional partners. Historically, data and information have been managed through numerous centralized, controlled information systems. Fisheries information has been fragmented and not widely exchanged. Where exchange has occurred, it often is not timely enough to allow resource managers to effectively use the information to guide planning and decision making. This project (and related projects) have successfully developed and piloted a network-based infrastructure that will serve as a vehicle to transparently connect existing information systems in a manner that makes information exchange efficient and inexpensive. This project was designed to provide a mechanism to help BPA address measures in the Northwest Power Planning Council's (NPPC) Fish and Wildlife program: 3.2H Disseminate Research and Monitoring Information and 5.1A.5 manage water supplies in accordance with the Annual Implementation Work Plan. This project also provided resources that can be used to assist monitoring and evaluation of the Program.

  13. Lively Infrastructure

    E-Print Network [OSTI]

    Amin, Ash

    2014-10-06T23:59:59.000Z

    and slack within and across the city’s infrastructural networks (Lahoud, 2010; Vale and Campanella, 2005; Batty, 2013). Importantly, this writing shows that there is nothing purely technical or mechanical about even the most digitised infrastructures... given to, and commanded by, building a house piece by piece when time and resource allow, the measures taken to pirate water and electricity, build sanitary pits, and make indoor or outdoor showers and kitchens, making a house into a home...

  14. Controlled Hydrogen Fleet and Infrastructure Analysis (Presentation)

    SciTech Connect (OSTI)

    Wipke, K.

    2007-05-17T23:59:59.000Z

    This presentation by Keith Wipke at the 2007 DOE Hydrogen Program Annual Merit Review Meeting provides information about NREL's Controlled Hydrogen Fleet and Infrastructure Analysis Project.

  15. Accessibility Application Blue Badge Car Park UK

    E-Print Network [OSTI]

    Painter, Kevin

    i Accessibility Application Blue Badge Car Park UK Konstantinos Grassos H00113751 August 2012. In this project, Blue Badge Car Park (BBCP) is presented which is actually a mobile-based park finder application. It specifically focuses on finding parking spaces for wheelchair users, which are indicated by the blue badge

  16. Hydrogen Vehicle and Infrastructure Codes and Standards Citations (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2010-07-01T23:59:59.000Z

    This document lists codes and standards typically used for U.S. hydrogen vehicle and infrastructure projects.

  17. Electric Vehicle and Infrastructure Codes and Standards Citations (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2010-07-01T23:59:59.000Z

    This document lists codes and standards typically used for U.S. electric vehicle and infrastructure projects.

  18. Biodiesel Vehicle and Infrastructure Codes and Standards Citations (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2010-07-01T23:59:59.000Z

    This document lists codes and standards typically used for U.S. biodiesel vehicle and infrastructure projects.

  19. Natural Gas Vehicle and Infrastructure Codes and Standards Citations (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2010-07-01T23:59:59.000Z

    This document lists codes and standards typically used for U.S. natural gas vehicle and infrastructure projects.

  20. Fuel Cell Vehicle Infrastructure Learning Demonstration: Status and Results; Preprint

    SciTech Connect (OSTI)

    Wipke, K.; Sprik, S.; Kurtz, J.; Garbak, J.

    2008-09-01T23:59:59.000Z

    Article prepared for ECS Transactions that describes the results of DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation project.

  1. Ethanol Vehicle and Infrastructure Codes and Standards Citations (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2010-07-01T23:59:59.000Z

    This document lists codes and standards typically used for U.S. ethanol vehicle and infrastructure projects.

  2. Propane Vehicle and Infrastructure Codes and Standards Citations (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2010-07-01T23:59:59.000Z

    This document lists codes and standards typically used for U.S. propane vehicle and infrastructure projects.

  3. Dueling Stakeholders and Dual-Hatted Systems Engineers: Engineering Challenges, Capabilities and Skills in Government Infrastructure Technology Projects

    E-Print Network [OSTI]

    Brooks, JoAnn M.

    2009-10-02T23:59:59.000Z

    Engineering projects that support government enterprises face substantial challenges due to demands from diverse stakeholders and rapidly-changing technologies. In this paper, we present findings from analysis of five case ...

  4. Dueling Stakeholders and Dual-Hatted Systems Engineers: Engineering Challenges, Capabilities, and Skills in Government Infrastructure Technology Projects

    E-Print Network [OSTI]

    Brooks, JoAnn M.

    Systems engineering projects that support government enterprises face substantial challenges due to demands from diverse stakeholders and rapidly changing technologies. In this paper, we present findings from the analysis ...

  5. Economic and Conservation Evaluation of Capital Renovation Projects: Cameron County Irrigation District No. 2 (San Benito) - Infrastructure Rehabilitation - Final

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.; Popp, Michael C.

    of Reclamation (BOR). The proposed project involves rehabilitating 42+ miles of canals, laterals, and pipelines. Both nominal and real estimates of water and energy savings and expected economic and financial costs of those savings are identified throughout...

  6. Economic and Conservation Evaluation of Capital Renovation Projects: Cameron County Irrigation District No. 2 (San Benito) – Infrastructure Rehabilitation – Preliminary

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

    of Reclamation (BOR). The proposed project involves rehabilitating 42+ miles of canals, laterals, and pipelines. Both nominal and real estimates of water and energy savings and expected economic and financial costs of those savings are identified throughout...

  7. Michigan E85 Infrastructure

    SciTech Connect (OSTI)

    Sandstrom, Matthew M.

    2012-03-30T23:59:59.000Z

    This is the final report for a grant-funded project to financially assist and otherwise provide support to projects that increase E85 infrastructure in Michigan at retail fueling locations. Over the two-year project timeframe, nine E85 and/or flex-fuel pumps were installed around the State of Michigan at locations currently lacking E85 infrastructure. A total of five stations installed the nine pumps, all providing cost share toward the project. By using cost sharing by station partners, the $200,000 provided by the Department of Energy facilitated a total project worth $746,332.85. This project was completed over a two-year timetable (eight quarters). The first quarter of the project focused on project outreach to station owners about the incentive on the installation and/or conversion of E85 compatible fueling equipment including fueling pumps, tanks, and all necessary electrical and plumbing connections. Utilizing Clean Energy Coalition (CEC) extensive knowledge of gasoline/ethanol infrastructure throughout Michigan, CEC strategically placed these pumps in locations to strengthen the broad availability of E85 in Michigan. During the first and second quarters, CEC staff approved projects for funding and secured contracts with station owners; the second through eighth quarters were spent working with fueling station owners to complete projects; the third through eighth quarters included time spent promoting projects; and beginning in the second quarter and running for the duration of the project was spent performing project reporting and evaluation to the US DOE. A total of 9 pumps were installed (four in Elkton, two in Sebewaing, one in East Lansing, one in Howell, and one in Whitmore Lake). At these combined station locations, a total of 192,445 gallons of E85, 10,786 gallons of E50, and 19,159 gallons of E30 were sold in all reporting quarters for 2011. Overall, the project has successfully displaced 162,611 gallons (2,663 barrels) of petroleum, and reduced regional GHG emissions by 375 tons in the first year of station deployment.

  8. Blue Pork

    E-Print Network [OSTI]

    Hacker, Randi; Boyd, David

    2011-05-29T23:59:59.000Z

    Broadcast Transcript: The Chinese have a centuries-old love affair with pork. It constitutes 70% of the meat in their diet. Mao Zedong even called pork a "national treasure." However, that pork was the "the other white meat," not phosphorescent blue...

  9. Energy Infrastructure Events and Expansions Infrastructure Security...

    Office of Environmental Management (EM)

    Year-in-Review: 2010 Energy Infrastructure Events and Expansions Infrastructure Security and Energy Restoration Office of Electricity Delivery and Energy Reliability U.S....

  10. What Kind of Charging Infrastructure Do Chevrolet Volt Drivers in The EV Project Use and When Do They Use It?

    SciTech Connect (OSTI)

    Shawn Salisbury

    2014-09-01T23:59:59.000Z

    This document will present information describing the charging behavior of Chevrolet Volts that were enrolled in the EV Project. It will included aggregated data from more than 1,800 vehicles regarding locations, power levels, and time-of-day of charging events performed by those vehicles. This document will be published to the INL AVTA website.

  11. HYDROGEN REGIONAL INFRASTRUCTURE PROGRAM

    E-Print Network [OSTI]

    HYDROGEN REGIONAL INFRASTRUCTURE PROGRAM IN PENNSYLVANIA HYDROGEN REGIONAL INFRASTRUCTURE PROGRAM date ­ November 23, 2004 · Contract end date ­ March 31, 2006 #12;Hydrogen Regional Infrastructure Program in Pennsylvania Hydrogen Regional Infrastructure Program in Pennsylvania · Objectives ­ Capture

  12. ESPC Project Developer's Resource Guide

    Energy Savers [EERE]

    in the charts, and are identified alongside additional detail in Section 4. 4 *Items in blue are project deliverables. 5 *Items in blue are project deliverables. 6 *Items in blue...

  13. Infrastructure Security

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHigh SchoolIn Other News link toInfluenceInfrared MappingInfrastructure

  14. A Mul&-Scale Design and Control Framework for Dynamically Coupled Sustainable and Resilient Infrastructures,

    E-Print Network [OSTI]

    Daly, Samantha

    electricity. -RedistribuRng power demand over Rme in both infrastructures with the electric power infrastructure. This is the project's test bed applicaRon. 0 FUEL PUMP PHEV BATTERY Outlet Personal TransportaRon Infrastructure Electric

  15. Blue oak stump sprouting evaluated after firewood harvest in northern Sacramento Valley

    E-Print Network [OSTI]

    Standiford, Richard B.; McCreary, Douglas D.; Barry, Sheila J; Forero, Larry C.

    2011-01-01T23:59:59.000Z

    TABLE 4. Inventory data for blue oak thinning project in8. Standiford RB. 1997. Growth of blue oak on California’s2008. Stump sprouting of blue oaks 19 years after harvest.

  16. Bluefield Blue Jays Internships

    E-Print Network [OSTI]

    Minnesota, University of

    Bluefield Blue Jays Internships General Internship Start Date: Mid May 2014 JOB DESCRIPTION: The Bluefield Blue Jays, Appalachian League Affiliate of the Toronto Blue Jays is looking for an individual: #12;The Bluefield Blue Jays, Appalachian League Affiliate of the Toronto Blue Jays is looking

  17. RESEARCH INFRASTRUCTURES Roadmap 2008

    E-Print Network [OSTI]

    Horn, David

    RESEARCH INFRASTRUCTURES FOR FRANCE Roadmap 2008 #12;INTRODUCTION European research infrastructures and development, benefiting to Europe's economy and competitiveness. This roadmap for the research infrastructures....................................................................................................6 3. The roadmap: existing and already decided RIs and others at the planning stage

  18. INFRASTRUCTURE SECURITY & ENERGY

    E-Print Network [OSTI]

    Schrijver, Karel

    INFRASTRUCTURE SECURITY & ENERGY RESTORATION OFFICE of ELECTRICITY DELIVERY & ENERGY RELIABILITY Delivery and Energy Reliability #12;INFRASTRUCTURE SECURITY & ENERGY RESTORATION OFFICE of ELECTRICITY Federal agencies to support waivers and specific response legal authorities #12;INFRASTRUCTURE SECURITY

  19. Wide Blue Sky

    E-Print Network [OSTI]

    Collins, Caroline Imani

    2011-01-01T23:59:59.000Z

    dressed neatly in a dark blue dress, its high neck trimmedIt was covered in a light blue fabric embellished with softOF CALIFORNIA RIVERSIDE Wide Blue Sky A Thesis submitted in

  20. G-Man Blues

    E-Print Network [OSTI]

    Cohn, Lee Michael

    2011-01-01T23:59:59.000Z

    you’re mistaken. I know my blues, friend. BARRY Anyone can’tdon’t know shit about the blues. The Drag Queen laughs.interest in traditional blues all of a sudden? BARRY Because

  1. EIS-0116-S1: Final Supplemental Environmental Impact Statement for the Blue River-Gore Pass Portion of the Hayden-Blue River Transmission Line Project, Grand and Summit Counties, Colorado

    Broader source: Energy.gov [DOE]

    This supplemental environmental impact statement by the Western Area Power Administration assesses the environmental effects of constructing, operating, and maintaining about 30 miles of 230/345-kV transmission line between the existing Gore Pass Substation northwest of Kremmling, Colorado, and a proposed new substation (not part of this action) near the Ute Pass Road. Alternatives assessed included routing and design alternatives plus the alternatives addressed in the Hayden-Blue River Final EIS, issued by the Rural Electrification Administration in July 1982 and adopted by DOE in June 1985 (see DOE/EIS-0116).

  2. Modeling Risks in Infrastructure Asset Management

    E-Print Network [OSTI]

    Seyedolshohadaie, Seyed Reza

    2012-10-19T23:59:59.000Z

    in privatizing and operational risks in maintenance and rehabilitation of infrastructure facilities. To this end, a valuation procedure for valuing large-scale risky projects is proposed. This valuation approach is based on mean-risk portfolio optimization...

  3. Dispersion of agglomeration through transport infrastructure

    E-Print Network [OSTI]

    Fang, Wanli, Ph. D. Massachusetts Institute of Technology

    2013-01-01T23:59:59.000Z

    My dissertation aims to assess transport infrastructure's influence on the productivity, scale and distribution of urban economic activities through changing intercity accessibility. Standard project-level cost-benefit ...

  4. Hydrogen Fueling Infrastructure Research and Station Technology

    Broader source: Energy.gov [DOE]

    Presentation slides from the DOE Fuel Cell Technologies Office webinar "An Overview of the Hydrogen Fueling Infrastructure Research and Station Technology (H2FIRST) Project" held on November 18, 2014.

  5. NREL UL Fuel Dispensing Infrastructure Intermediate Blends Performance Testing (Presentation)

    SciTech Connect (OSTI)

    Moriarty, K.; Clark, W.

    2011-01-01T23:59:59.000Z

    Presentation provides an overview of NREL's project to determine compatibility and safe performance of installed fuel dispensing infrastructure with E15.

  6. Controlled Hydrogen Fleet and Infrastructure Analysis (2008 Presentation)

    SciTech Connect (OSTI)

    Wipke, K.; Sprik, S.; Kurtz, J.

    2008-06-10T23:59:59.000Z

    This presentation by Keith Wipke at the 2008 DOE Hydrogen Program Annual Merit Review Meeting provides information about NREL's Controlled Hydrogen Fleet and Infrastructure Analysis Project.

  7. AVTA: EVSE Testing - NYSERDA Electric Vehicle Charging Infrastructure...

    Energy Savers [EERE]

    data below is from an electric vehicle charging infrastructure project run by the New York State Energy Research and Development Authority (NYSERDA). The reports describe...

  8. Interdependence of Electricity System Infrastructure and Natural...

    Energy Savers [EERE]

    Interdependence of Electricity System Infrastructure and Natural Gas Infrastructure - EAC 2011 Interdependence of Electricity System Infrastructure and Natural Gas Infrastructure -...

  9. Sandia Energy - Water Infrastructure Security

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Infrastructure Security Home Climate & Earth Systems WaterEnergy Nexus Decision Models for Integrating EnergyWater Water Infrastructure Security Water Infrastructure...

  10. Energy Transmission and Infrastructure

    SciTech Connect (OSTI)

    Mathison, Jane

    2012-12-31T23:59:59.000Z

    The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: • improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; • identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); • analyze the potential within the district to utilize farm wastes to produce biofuels; • enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; • identify the policy, regulatory, and financial barriers impeding development of a new energy system; and • improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the College’s yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

  11. Public Works Transportation Infrastructure Study

    E-Print Network [OSTI]

    Minnesota, University of

    Public Works Transportation Infrastructure Study Minneapolis City of Lakes Minneapolis Public Works Transportation Infrastructure Study #12;Public Works Transportation Infrastructure Study Minneapolis City Works Transportation Infrastructure Study Minneapolis City of Lakes Background: · Currently, funding

  12. The Pennsylvania State University Marching Blue Band Blue Band Office

    E-Print Network [OSTI]

    Maroncelli, Mark

    The Pennsylvania State University Marching Blue Band Press Kit Blue Band Office 101 Blue Band Director vcc2@psu.edu orb1@psu.edu gad157@psu.edu (814) 865 - 3982 #12;History of the Blue Band The Marching Blue Band numbers 310 members which includes: 260 instrumentalists, 34 silks, 14 Touch of Blue

  13. Blue Cross and Blue Shield of Florida is now Florida Blue State Employees' PPO Plan health insurance provider Blue Cross and Blue Shield of

    E-Print Network [OSTI]

    Ronquist, Fredrik

    Blue Cross and Blue Shield of Florida is now Florida Blue State Employees' PPO Plan health insurance provider Blue Cross and Blue Shield of Florida has recently changed its name to Florida Blue Resources Benefits Office at (850) 6444015, or insben@admin.fsu.edu. RELATED LINKS ­ Florida Blue

  14. Hydrogen Transition Infrastructure Analysis

    SciTech Connect (OSTI)

    Melendez, M.; Milbrandt, A.

    2005-05-01T23:59:59.000Z

    Presentation for the 2005 U.S. Department of Energy Hydrogen Program review analyzes the hydrogen infrastructure needed to accommodate a transitional hydrogen fuel cell vehicle demand.

  15. CU-ICAR Hydrogen Infrastructure Final Report

    SciTech Connect (OSTI)

    Robert Leitner; David Bodde; Dennis Wiese; John Skardon; Bethany Carter

    2011-09-28T23:59:59.000Z

    The goal of this project was to establish an innovation center to accelerate the transition to a 'hydrogen economy' an infrastructure of vehicles, fuel resources, and maintenance capabilities based on hydrogen as the primary energy carrier. The specific objectives of the proposed project were to: (a) define the essential attributes of the innovation center; (b) validate the concept with potential partners; (c) create an implementation plan; and (d) establish a pilot center and demonstrate its benefits via a series of small scale projects.

  16. Hydrogen Production Infrastructure Options Analysis | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Infrastructure Options Analysis Hydrogen Production Infrastructure Options Analysis Presentation on hydrogen production and infrastructure options presented at the DOE Transition...

  17. State Transmission Infrastructure Authorities: The Story So Far; December 2007 - December 2008

    SciTech Connect (OSTI)

    Porter, K.; Fink. S.

    2008-05-01T23:59:59.000Z

    This report examines the status and future direction of state transmission infrastructure authorities. It summarizes common characteristics, discusses current transmission projects, and outlines common issues the state infrastructure authorities have faced.

  18. A sociotechnical framework for understanding infrastructure breakdown and repair

    SciTech Connect (OSTI)

    Sims, Benjamin H [Los Alamos National Laboratory

    2009-01-01T23:59:59.000Z

    This paper looks at how and why infrastructure is repaired. With a new era of infrastructure spending underway, policymakers need to understand and anticipate the particular technical and political challenges posed by infrastructure repair. In particular, as infrastructure problems are increasingly in the public eye with current economic stimulus efforts, the question has increasingly been asked: why has it been so difficult for the United Statesto devote sustained resources to maintaining and upgrading its national infrastructure? This paper provides a sociotechnical framework for understanding the challenges of infrastructure repair, and demonstrates this framework using a case study of seismic retrofit of freeway bridges in California. The design of infrastructure is quite different from other types of design work even when new infrastructure is being designed. Infrastructure projects are almost always situated within, and must work with, existing infrastructure networks. As a result, compared to design of more discrete technological artifacts, the design of infrastructure systems requires a great deal of attention to interfaces as well as adaptation of design to the constraints imposed by existing systems. Also, because of their scale, infrastructural technologies engage with social life at a level where explicit political agendas may playa central role in the design process. The design and building of infrastructure is therefore often an enormously complex feat of sociotechnical engineering, in which technical and political agendas are negotiated together until an outcome is reached that allows the project to move forward. These sociotechnical settlements often result in a complex balancing of powerful interests around infrastructural artifacts; at the same time, less powerful interests have historically often been excluded or marginalized from such settlements.

  19. Global Infrastructures Abstract/Summary

    E-Print Network [OSTI]

    Sahay, Sundeep

    facilities, electricity supply, state of the physical building etc. The socioeconomic and geopolitical in large hospitals (and other corporate infrastructures) and infrastructures supporting the governance the practical development of infrastructures supporting the governance of the health care sector in developing

  20. Blue Award 2012 International

    E-Print Network [OSTI]

    Blue Award 2012 · International Student Competition for Sustainable Architecture Sign in: www.blueaward.at Blue Award 2012 · International Student Competition for Sustainable Architecture Organizers Vienna blueaward.at Organizers Vienna University of Technology Department for Spatial and Sustainable Design

  1. Sandia Energy - Resilient Electric Infrastructures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Resilient Electric Infrastructures Home Stationary Power Grid Modernization Resilient Electric Infrastructures Resilient Electric Infrastructuresashoter2015-04-29T22:16:42+00:00...

  2. Hydrogen Delivery Infrastructure Option Analysis

    Broader source: Energy.gov (indexed) [DOE]

    Infrastructure Hydrogen Delivery Infrastructure Option Analysis Option Analysis DOE and FreedomCAR & Fuel Partnership Hydrogen Delivery and On-Board Storage Analysis Workshop...

  3. Final Report on National NGV Infrastructure

    SciTech Connect (OSTI)

    GM Sverdrup; JG DeSteese; ND Malcosky

    1999-01-07T23:59:59.000Z

    This report summarizes work fimded jointly by the U.S. Department of Energy (DOE) and by the Gas Research Institute (GRI) to (1) identi& barriers to establishing sustainable natural gas vehicle (NGV) infrastructure and (2) develop planning information that can help to promote a NGV infrastructure with self-sustaining critical maw. The need for this work is driven by the realization that demand for NGVS has not yet developed to a level that provides sufficient incentives for investment by the commercial sector in all necessary elements of a supportive infrastructure. The two major objectives of this project were: (1) to identifi and prioritize the technical barriers that may be impeding growth of a national NGV infrastructure and (2) to develop input that can assist industry in overcoming these barriers. The approach used in this project incorporated and built upon the accumulated insights of the NGV industry. The project was conducted in three basic phases: (1) review of the current situation, (2) prioritization of technical infrastructure btiiers, and (3) development of plans to overcome key barriers. An extensive and diverse list of barriers was obtained from direct meetings and telephone conferences with sixteen industry NGV leaders and seven Clean Cities/Clean Corridors coordinators. This information is filly documented in the appendix. A distillation of insights gained in the interview process suggests that persistent barriers to developing an NGV market and supporting infrastructure can be grouped into four major categories: 1. Fuel station economics 2. Value of NGVs from the owner/operator perspective 3. Cooperation necessary for critical mass 4. Commitment by investors. A principal conclusion is that an efficient and effective approach for overcoming technical barriers to developing an NGV infrastructure can be provided by building upon and consolidating the relevant efforts of the NGV industry and government. The major recommendation of this project is the establishment of an ad hoc NGV Infrastructure Working Group (NGV-I WG) to address the most critical technical barriers to NGV infrastructure development. This recommendation has been considered and approved by both the DOE and GRI and is the basis of continued collaboration in this area.

  4. Seismic Engineering Research Infrastructures for European Synergies (SERIES)

    E-Print Network [OSTI]

    Seismic Engineering Research Infrastructures for European Synergies (SERIES) M.N. Fardis University of Patras, Greece SUMMARY: Through the 4-year project SERIES (Seismic Engineering Research Infrastructures of their research. It also helps them to enhance their potential, by jointly developing novel seismic testing

  5. S E R I E S SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES

    E-Print Network [OSTI]

    S E R I E S SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES COMMISSION, In memory of Prof. Roy Severn #12;SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES · Project Framework · Experimental Campaign · Outcome Outline #12;SEISMIC ENGINEERING RESEARCH

  6. Super Projects (Arkansas)

    Broader source: Energy.gov [DOE]

    A 2004 amendment to the state constitution authorizes the state to attract super projects by issuing bonds to fund a project’s infrastructure, limited to 5% of the net general revenues during the...

  7. Controlled Hydrogen Fleet and Infrastructure Analysis (Presentation)

    SciTech Connect (OSTI)

    Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Ainscough, C.; Saur, G.

    2012-05-01T23:59:59.000Z

    This is a presentation about the Fuel Cell Electric Vehicle Learning Demo, a 7-year project and the largest single FCEV and infrastructure demonstration in the world to date. Information such as its approach, technical accomplishments and progress; collaborations and future work are discussed.

  8. London 2012 Infrastructure Design, Sustainability and Innovation,

    E-Print Network [OSTI]

    Painter, Kevin

    February 2013 #12;#12;London 2012 Aspiration of a Sustainable Games #12;#12;Project Management , for both soil and groundwater treatment. As part of this work, we have managed the excavation and reuseLondon 2012 Infrastructure Design, Sustainability and Innovation, Inspiring an Industry

  9. IPHE Infrastructure Workshop Proceedings

    Fuel Cell Technologies Publication and Product Library (EERE)

    This proceedings contains information from the IPHE Infrastructure Workshop, a two-day interactive workshop held on February 25-26, 2010, to explore the market implementation needs for hydrogen fuelin

  10. Thermodynamically Stable Blue Phases

    E-Print Network [OSTI]

    F. Castles; S. M. Morris; E. M. Terentjev; H. J. Coles

    2011-01-28T23:59:59.000Z

    We show theoretically that flexoelectricity stabilizes blue phases in chiral liquid crystals. Induced internal polarization reduces the elastic energy cost of splay and bend deformations surrounding singular lines in the director field. The energy of regions of double twist is unchanged. This in turn reduces the free energy of the blue phase with respect to that of the chiral nematic phase, leading to stability over a wider temperature range. The theory explains the discovery of large temperature range blue phases in highly flexoelectric "bimesogenic" and "bent-core" materials, and predicts how this range may be increased further.

  11. Blue Cross Blue Shield of Massachusetts is an Independent Licensee of the Blue Cross and Blue Shield Association Expanded Coverage for Preventive Care Under

    E-Print Network [OSTI]

    Aalberts, Daniel P.

    Blue Cross Blue Shield of Massachusetts is an Independent Licensee of the Blue Cross and Blue. Effect the New Rules Will Have on Members and Accounts Blue Cross Blue Shield of Massachusetts. Blue Cross Blue Shield of Massachusetts will offer the following services with no member cost share

  12. Microsoft Word - GHGT11_Litynski_NETL Infrastructure.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    R&D Program to Develop Infrastructure for Carbon Storage: Overview of the Regional Carbon Sequestration Partnerships and other R&D Field Projects John Litynski 1* , Traci Rodosta 1...

  13. Choosing between Blue Cross plans...

    E-Print Network [OSTI]

    Burke, Peter

    Choosing between Blue Cross plans... ...when you have Medicare PresentedPresented By Glenn. Medicare and UC II. Medicare and Anthem Blue Cross III. Plan Comparisons · Pros/Cons · Medical coverage will automatically be enrolled in Part D by Blue Cross No additional Part D premium · Blue Cross members have

  14. NREL UL E15 Fuel Dispensing Infrastructure Intermediate Blends Performance Testing (Presentation)

    SciTech Connect (OSTI)

    Moriarty, K.; Clark, W.

    2011-02-01T23:59:59.000Z

    Presentation provides an overview of NREL's project to determine compatibility and safe performance of installed fuel dispensing infrastructure with E15.

  15. SunLine Test Drives Hydrogen Bus: Hydrogen Fuel Cell & Infrastructure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Test Drives Hydrogen Bus: Hydrogen Fuel Cell & Infrastructure Technologies Program, Fuel Cell Bus Demonstration Projects Fact Sheet. SunLine Test Drives Hydrogen Bus: Hydrogen Fuel...

  16. LNG infrastructure and equipment

    SciTech Connect (OSTI)

    Forgash, D.J.

    1995-12-31T23:59:59.000Z

    Sound engineering principals have been used by every company involved in the development of the LNG infrastructure, but there is very little that is new. The same cryogenic technology that is used in the manufacture and sale of nitrogen, argon, and oxygen infrastructure is used in LNG infrastructure. The key component of the refueling infrastructure is the LNG tank which should have a capacity of at least 15,000 gallons. These stainless steel tanks are actually a tank within a tank separated by an annular space that is void of air creating a vacuum between the inner and outer tank where superinsulation is applied. Dispensing can be accomplished by pressure or pump. Either works well and has been demonstrated in the field. Until work is complete on NFPA 57 or The Texas Railroad Commission Rules for LNG are complete, the industry is setting the standards for the safe installation of refueling infrastructure. As a new industry, the safety record to date has been outstanding.

  17. NGNP Infrastructure Readiness Assessment: Consolidation Report

    SciTech Connect (OSTI)

    Brian K Castle

    2011-02-01T23:59:59.000Z

    The Next Generation Nuclear Plant (NGNP) project supports the development, demonstration, and deployment of high temperature gas-cooled reactors (HTGRs). The NGNP project is being reviewed by the Nuclear Energy Advisory Council (NEAC) to provide input to the DOE, who will make a recommendation to the Secretary of Energy, whether or not to continue with Phase 2 of the NGNP project. The NEAC review will be based on, in part, the infrastructure readiness assessment, which is an assessment of industry's current ability to provide specified components for the FOAK NGNP, meet quality assurance requirements, transport components, have the necessary workforce in place, and have the necessary construction capabilities. AREVA and Westinghouse were contracted to perform independent assessments of industry's capabilities because of their experience with nuclear supply chains, which is a result of their experiences with the EPR and AP-1000 reactors. Both vendors produced infrastructure readiness assessment reports that identified key components and categorized these components into three groups based on their ability to be deployed in the FOAK plant. The NGNP project has several programs that are developing key components and capabilities. For these components, the NGNP project have provided input to properly assess the infrastructure readiness for these components.

  18. Report of the Blue Ribbon Panel on the Review of the Radiation...

    Broader source: Energy.gov (indexed) [DOE]

    October 11, 1995 This report summarizes the findings of the Blue Ribbon Panel's review of the RERF scientific projects and future research plans The report recommended that the...

  19. Energy, Climate & Infrastructure Security

    E-Print Network [OSTI]

    Energy, Climate & Infrastructure Security EXCEPTIONAL SERVICE IN THE NATIONAL INTEREST Sandia Security Administration under contract DE-AC04-94AL85000. SAND 2012-1846P CustomTraining Sandia providesPRAsandhowtheycanbemanaged to increase levels of safety and security. Like othertrainings,Sandiaexpertsdesigncoursesto beasbroadorin

  20. COLLEGE OF ENGINEERING Infrastructure

    E-Print Network [OSTI]

    solar energy (8). ME Ketul Popat and John Williams in the Department of Mechanical EngineeringCOLLEGE OF ENGINEERING Infrastructure #12;2 COLLEGE OF ENGINEERING This publication focuses on just a few of the incredible College of Engineering faculty and students who are conducting research related

  1. Sclerosing cellular blue nevus simulating melanoma

    E-Print Network [OSTI]

    Aydingoz, Ikbal Esen; Dikicioglu-Cetin, Emel

    2012-01-01T23:59:59.000Z

    F, Cainelli T. Agminate blue nevus combined with lentigo. Ais a very rare type of blue nevus and owing to the diversitymelanocytic neoplasms: sclerotic blue nevi. Arch Dermatol .

  2. Blue Ball Properties – initiating responsible environmental stewardship

    E-Print Network [OSTI]

    McColl, Jayne E.; Daly, Dorothy

    2003-01-01T23:59:59.000Z

    2002. Environmental Assessment, Blue Ball Properties Areamarkers at the site. Photo 1. Blue Ball Dairy Barn. Photo 2.BLUE BALL PROPERTIES – INITIATING RESPONSIBLE ENVIRONMENTAL

  3. Blue Mosque Istanbul, Turkey

    E-Print Network [OSTI]

    Liu, Taosheng

    · · · · / · #12;V1 Blue Mosque Istanbul, Turkey 156 Cradle Of History V1 PRSRTSTD U Greece, Israel, Cyprus and Turkey. Depart Athens for Agios Nikolaos and admire its rich beauty that island of Rhodes, with its wealth of ancient archaeological monuments. Sail to Turkey and visit the ruins

  4. In Situ Nuclear Characterization Infrastructure

    SciTech Connect (OSTI)

    James A. Smith; J. Rory Kennedy

    2011-11-01T23:59:59.000Z

    To be able to evolve microstructure with a prescribed in situ process, an effective measurement infrastructure must exist. This interdisciplinary infrastructure needs to be developed in parallel with in situ sensor technology. This paper discusses the essential elements in an effective infrastructure.

  5. INFRASTRUCTURE Engineering and Physical Sciences

    E-Print Network [OSTI]

    Berzins, M.

    the vital research that underpins this development. The UK Government Strategy for National Infrastructure and resilient infrastructure supplying water, energy, communications, transport systems and waste systems. Infrastructure is a broad topic and is relevant to other sectors including Healthcare, Renewable and Clean Energy

  6. The Blue Whale, Balaenoptera musculus

    E-Print Network [OSTI]

    The Blue Whale, Balaenoptera musculus SALLY A. MIZROCH, DALE W. RICE, and JEFFREY M. BREIWICK Introduction The blue whale, Balaenoptera mus- culus (Linnaeus, 1758), is not only the largest of the whales metric tons (t) (Mackintosh, 1942). Blue whales are entirely bluish-gray in color, except for the white

  7. Electric Drive Vehicle Demonstration and Vehicle Infrastructure...

    Broader source: Energy.gov (indexed) [DOE]

    Utilization Data Base Evaluate Infrastructure Effectiveness Develop Sustainable Business Models Develop Models For Future Infrastructure Deployments Relevance MILESTONES...

  8. Guide to Critical Infrastructure Protection Cyber Vulnerability...

    Office of Environmental Management (EM)

    Infrastructure Protection Cyber Vulnerability Assessment More Documents & Publications Wireless System Considerations When Implementing NERC Critical Infrastructure Protection...

  9. Hydrogen Infrastructure Market Readiness Workshop: Preliminary...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workshop: Preliminary Results Hydrogen Infrastructure Market Readiness Workshop: Preliminary Results Preliminary results from the Hydrogen Infrastructure Market Readiness Workshop...

  10. Upcoming Webinar December 16: International Hydrogen Infrastructure...

    Energy Savers [EERE]

    Upcoming Webinar December 16: International Hydrogen Infrastructure Challenges NOW, DOE, and NEDO Upcoming Webinar December 16: International Hydrogen Infrastructure Challenges...

  11. Why Blue-Collar Blacks Help Less

    E-Print Network [OSTI]

    Smith, Sandra Susan; Young, Kara Alexis

    2013-01-01T23:59:59.000Z

    Exclude Black Men from Blue-Collar Jobs. Berkeley, CA:How Black and Latino Blue Collar Workers Make Decisionsof Sample Respondents Blue-Collar Latinos Blue-Collar Black

  12. Nahr Beirut : projections on an infrastructural landscape

    E-Print Network [OSTI]

    Frem, Sandra

    2009-01-01T23:59:59.000Z

    A century ago, Nahr Beirut was a riparian river which flowed from a mountainous valley to a coastal plain, the Beirut Peninsula, before entering the Julian Beinart Mediterranean Sea. After being for centuries the distant ...

  13. Livingston Campus Infrastructure Improvements The Project

    E-Print Network [OSTI]

    Neimark, Alexander V.

    transformation of the Livingston Campus for undergraduate, graduate and professional studies, a series will be installed at the intersection of Avenue E and Rockafeller Road to help control traffic movement and to create a gateway to the Livingston Campus academic core. Additionally, an expanded intercampus bus stop

  14. California Hydrogen Infrastructure Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia:Power LP Biomass Facilityin ChartsQuality Act Jump to:

  15. Transmission Infrastructure Investment Projects (2009) | Department of

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof Energy 2, 2015 - JanuaryTankToledo, Ohio, DataTechnicalDepartment ofKnow?Energy

  16. Pennsylvania Regional Infrastructure Project | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOrigin of Contamination in235-1 TermoelectricaPaving the path forIn-Vehicle,Pennsylvania Regional

  17. California Hydrogen Infrastructure Project | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: Theof Energy Change Request |82:91:4Applications | DepartmentFuelHydrogen

  18. Infrastructure and Operations Improvement Project Director | Princeton

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHigh SchoolIn Other News linkThermal Phenomena in Nuclear EnergyPlasma

  19. Stabilising the Blue Phases

    E-Print Network [OSTI]

    G. P. Alexander; J. M. Yeomans

    2006-09-22T23:59:59.000Z

    We present an investigation of the phase diagram of cholesteric liquid crystals within the framework of Landau - de Gennes theory. The free energy is modified to incorporate all three Frank elastic constants and to allow for a temperature dependent pitch in the cholesteric phase. It is found that the region of stability of the cubic blue phases depends significantly on the value of the elastic constants, being reduced when the bend elastic constant is larger than splay and when twist is smaller than the other two. Most dramatically we find a large increase in the region of stability of blue phase I, and a qualitative change in the phase diagram, in a system where the cholesteric phase displays helix inversion.

  20. Best Linear Unbiased Estimate Motivation for BLUE

    E-Print Network [OSTI]

    Fowler, Mark

    1 Chapter 6 Best Linear Unbiased Estimate (BLUE) #12;2 Motivation for BLUE Except for Linear Model to a sub-optimal estimate BLUE is one such sub-optimal estimate Idea for BLUE: 1. Restrict estimate) Advantage of BLUE:Needs only 1st and 2nd moments of PDF Mean & Covariance Disadvantages of BLUE: 1. Sub

  1. Sandia National Laboratories: Infrastructure Security

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    regulation, ... Portable Hydrogen Fuel-Cell Unit to Provide Green, Sustainable Power to Honolulu Port On March 13, 2014, in Center for Infrastructure Research and...

  2. Forecourt and Gas Infrastructure Optimization

    Broader source: Energy.gov (indexed) [DOE]

    Forecourt and Gas Infrastructure Optimization Bruce Kelly Nexant, Inc. Hydrogen Delivery Analysis Meeting May 8-9, 2007 Columbia, Maryland 2 Analysis of Market Demand and Supply...

  3. National Computational Infrastructure for Lattice Gauge Theory

    SciTech Connect (OSTI)

    Reed, Daniel, A

    2008-05-30T23:59:59.000Z

    In this document we describe work done under the SciDAC-1 Project National Computerational Infrastructure for Lattice Gauge Theory. The objective of this project was to construct the computational infrastructure needed to study quantim chromodynamics (QCD). Nearly all high energy and nuclear physicists in the United States working on the numerical study of QCD are involved in the project, as are Brookhaven National Laboratory (BNL), Fermi National Accelerator Laboratory (FNAL), and Thomas Jefferson National Accelerator Facility (JLab). A list of the serior participants is given in Appendix A.2. The project includes the development of community software for the effective use of the terascale computers, and the research and development of commodity clusters optimized for the study of QCD. The software developed as part of this effort is pubicly available, and is being widely used by physicists in the United States and abroad. The prototype clusters built with SciDAC-1 fund have been used to test the software, and are available to lattice guage theorists in the United States on a peer reviewed basis.

  4. National Computational Infrastructure for Lattice Gauge Theory

    SciTech Connect (OSTI)

    Brower, Richard C.

    2014-04-15T23:59:59.000Z

    SciDAC-2 Project The Secret Life of Quarks: National Computational Infrastructure for Lattice Gauge Theory, from March 15, 2011 through March 14, 2012. The objective of this project is to construct the software needed to study quantum chromodynamics (QCD), the theory of the strong interactions of sub-atomic physics, and other strongly coupled gauge field theories anticipated to be of importance in the energy regime made accessible by the Large Hadron Collider (LHC). It builds upon the successful efforts of the SciDAC-1 project National Computational Infrastructure for Lattice Gauge Theory, in which a QCD Applications Programming Interface (QCD API) was developed that enables lattice gauge theorists to make effective use of a wide variety of massively parallel computers. This project serves the entire USQCD Collaboration, which consists of nearly all the high energy and nuclear physicists in the United States engaged in the numerical study of QCD and related strongly interacting quantum field theories. All software developed in it is publicly available, and can be downloaded from a link on the USQCD Collaboration web site, or directly from the github repositories with entrance linke http://usqcd-software.github.io

  5. Flexoelectric blue phases

    E-Print Network [OSTI]

    G P Alexander; J M Yeomans

    2007-07-01T23:59:59.000Z

    We describe the occurence and properties of liquid crystal phases showing two dimensional splay and bend distortions which are stabilised by flexoelectric interactions. These phases are characterised by regions of locally double splayed order separated by topological defects and are thus highly analogous to the blue phases of cholesteric liquid crystals. We present a mean field analysis based upon the Landau--de Gennes Q-tensor theory and construct a phase diagram for flexoelectric structures using analytic and numerical results. We stress the similarities and discrepancies between the cholesteric and flexoelectric cases.

  6. BlueFire Ethanol

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The FutureCommentsEnergyandapproximately 10|BlueFire Ethanol, Inc. Corporate

  7. Blue-Dam

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041clothAdvanced Materials Advanced Materials Find FindRewind Generator RewindChronic BerylliumBlue4 B

  8. Blue-Dam

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041clothAdvanced Materials Advanced Materials Find FindRewind Generator RewindChronic BerylliumBlue4 B5

  9. Blue-Dam

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041clothAdvanced Materials Advanced Materials Find FindRewind Generator RewindChronic BerylliumBlue4

  10. Blue-Dam

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041clothAdvanced Materials Advanced Materials Find FindRewind Generator RewindChronic BerylliumBlue43 B

  11. Blue-Dam

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041clothAdvanced Materials Advanced Materials Find FindRewind Generator RewindChronic BerylliumBlue43

  12. Blue-LessInk

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041clothAdvanced Materials Advanced Materials Find FindRewind Generator RewindChronic BerylliumBlue436

  13. Energy infrastructure of the United States and projected siting needs: Scoping ideas, identifying issues and options. Draft report of the Department of Energy Working Group on Energy Facility Siting to the Secretary

    SciTech Connect (OSTI)

    Not Available

    1993-12-01T23:59:59.000Z

    A Department of Energy (DOE) Working Group on Energy Facility Siting, chaired by the Policy Office with membership from the major program and staff offices of the Department, reviewed data regarding energy service needs, infrastructure requirements, and constraints to siting. The Working Group found that the expeditious siting of energy facilities has important economic, energy, and environmental implications for key Administration priorities.

  14. Common Operations of Environmental Research Infrastructures: the ENVRI project Yannick Legr(1), Jacco Konijn(2), Alex Hardisty(3), Roberto Cossu(4), Sanna Sorvari(5) and Wouter Los(2) on behalf of the ENVRI consortium

    E-Print Network [OSTI]

    Boyer, Edmond

    -science components and services for their facilities. The results will speed up the construction and tools developed will be adopted by each infrastructure as it progresses through its construction phase (interference) radar signals from solar troposphere disturbances EPOS: Seismic data; satellite data on volcanic

  15. Implementing a Hydrogen Energy Infrastructure: Storage Options and System Design

    E-Print Network [OSTI]

    Ogden, Joan M; Yang, Christopher

    2005-01-01T23:59:59.000Z

    Natural Gas Based Hydrogen Infrastructure – Optimizingdevelopment of a hydrogen infrastructure has been identifiedrecent studies of hydrogen infrastructure have assessed

  16. Presented by Petascale System Infrastructure

    E-Print Network [OSTI]

    Presented by Petascale System Infrastructure Galen M. Shipman Group Leader, Technology Integration National Center for Computational Sciences #12;2 Managed by UT-Battelle for the U.S. Department of Energy and analysis cluster #12;3 Managed by UT-Battelle for the U.S. Department of Energy Shipman_Infrastructure_SC10

  17. Cyber and physical infrastructure interdependencies.

    SciTech Connect (OSTI)

    Phillips, Laurence R.; Kelic, Andjelka; Warren, Drake E.

    2008-09-01T23:59:59.000Z

    The goal of the work discussed in this document is to understand the risk to the nation of cyber attacks on critical infrastructures. The large body of research results on cyber attacks against physical infrastructure vulnerabilities has not resulted in clear understanding of the cascading effects a cyber-caused disruption can have on critical national infrastructures and the ability of these affected infrastructures to deliver services. This document discusses current research and methodologies aimed at assessing the translation of a cyber-based effect into a physical disruption of infrastructure and thence into quantification of the economic consequences of the resultant disruption and damage. The document discusses the deficiencies of the existing methods in correlating cyber attacks with physical consequences. The document then outlines a research plan to correct those deficiencies. When completed, the research plan will result in a fully supported methodology to quantify the economic consequences of events that begin with cyber effects, cascade into other physical infrastructure impacts, and result in degradation of the critical infrastructure's ability to deliver services and products. This methodology enables quantification of the risks to national critical infrastructure of cyber threats. The work addresses the electric power sector as an example of how the methodology can be applied.

  18. Blue Care Elect Enhanced Value (PPO)

    E-Print Network [OSTI]

    Aalberts, Daniel P.

    Blue Care Elect SM Enhanced Value (PPO) Summary of Benefits Williams College An Association of Independent Blue Cross and Blue Shield Plans This health plan meets Minimum Creditable Coverage Standards of your directory, call Member Service at the number on your ID card. ·Visit the Blue Cross Blue Shield

  19. Alternative Fuels Data Center: Blue Ridge Parkway Incorporates Alternative

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProducts (VAP)MassachusettsExperimentalInfrastructureFuels in Its Fleet Blue

  20. Rheology of Cubic Blue Phases

    E-Print Network [OSTI]

    Oliver Henrich; Kevin Stratford; Peter V. Coveney; Michael E. Cates; Davide Marenduzzo

    2013-10-30T23:59:59.000Z

    We study the behaviour of cubic blue phases under shear flow via lattice Boltzmann simulations. We focus on the two experimentally observed phases, Blue Phase I (BPI) and Blue Phase II (BPII). The disclination network of Blue Phase II continuously breaks and reforms under steady shear, leading to an oscillatory stress response in time. For larger shear rates, the structure breaks up into a Grandjean texture with a cholesteric helix lying along the flow gradient direction. Blue Phase I leads to a very different response. Here, oscillations are only possible for intermediate shear rates -- very slow flow causes a transition of the initially ordered structure into an amorphous network with an apparent yield stress. Larger shear rates lead to another amorphous state with different structure of the defect network. For even larger flow rates the same break-up into a Grandjean texture as for Blue Phase II is observed. At the highest imposed flow rates both cubic blue phases adopt a flow-aligned nematic state. Our results provide the first theoretical investigation of sheared blue phases in large systems, and are relevant to understanding the bulk rheology of these materials.

  1. Company Name: Blue Cross Blue Shield of MA Web Site: www.bluecrossma.com

    E-Print Network [OSTI]

    New Hampshire, University of

    Company Name: Blue Cross Blue Shield of MA Web Site: www.bluecrossma.com Industry: Healthcare Brief Company Overview: Headquartered in Boston, Blue Cross Blue Shield of Massachusetts provides comprehensive-level position: Please visit www.bluecrossma.com/careers. With almost 3 million members, Blue Cross Blue Shield

  2. Colorado Supplement to the Summary of Benefits and Coverage Form Anthem Blue Cross and Blue Shield

    E-Print Network [OSTI]

    Supplement to the Summary of Benefits and Coverage Form Anthem Blue Cross and Blue Shield CHEIBA Prime PPO Screenings, Prostate Cancer Screenings, and Colorectal Cancer Screenings. Anthem Blue Cross and Blue Shield Colorado, Inc. Independent licensees of the Blue Cross and Blue Shield Association. ®ANTHEM is a registered

  3. Colorado Supplement to the Summary of Benefits and Coverage Form Anthem Blue Cross and Blue Shield

    E-Print Network [OSTI]

    Supplement to the Summary of Benefits and Coverage Form Anthem Blue Cross and Blue Shield CHEIBA HMO/POS Plan. Anthem Blue Cross and Blue Shield is the trade name of Rocky Mountain Hospital and Medical Service, Inc. HMO products underwritten by HMO Colorado, Inc. Independent licensees of the Blue Cross and Blue

  4. Colorado Supplement to the Summary of Benefits and Coverage Form Anthem Blue Cross and Blue Shield

    E-Print Network [OSTI]

    Supplement to the Summary of Benefits and Coverage Form Anthem Blue Cross and Blue Shield CHEIBA Custom Plus Screenings, Prostate Cancer Screenings, and Colorectal Cancer Screenings. Anthem Blue Cross and Blue Shield Colorado, Inc. Independent licensees of the Blue Cross and Blue Shield Association. ®ANTHEM is a registered

  5. Optimal recovery sequencing for critical infrastructure resilience assessment.

    SciTech Connect (OSTI)

    Vugrin, Eric D.; Brown, Nathanael J. K.; Turnquist, Mark Alan (Cornell University, Ithaca, NY)

    2010-09-01T23:59:59.000Z

    Critical infrastructure resilience has become a national priority for the U. S. Department of Homeland Security. System resilience has been studied for several decades in many different disciplines, but no standards or unifying methods exist for critical infrastructure resilience analysis. This report documents the results of a late-start Laboratory Directed Research and Development (LDRD) project that investigated the identification of optimal recovery strategies that maximize resilience. To this goal, we formulate a bi-level optimization problem for infrastructure network models. In the 'inner' problem, we solve for network flows, and we use the 'outer' problem to identify the optimal recovery modes and sequences. We draw from the literature of multi-mode project scheduling problems to create an effective solution strategy for the resilience optimization model. We demonstrate the application of this approach to a set of network models, including a national railroad model and a supply chain for Army munitions production.

  6. The Huge, Blue, Jesus Glass Statue

    E-Print Network [OSTI]

    Robbins, Joanna

    2013-01-01T23:59:59.000Z

    Later, I found a huge, blue, glass statue of Jesus stuffedOF CALIFORNIA RIVERSIDE The Huge, Blue, Jesus Glass Statue Aeyes as RED And wrote down BLUE for your hair. I had to fix

  7. BRANCHED ALKANES FROM BLUE-GREEN ALGAE

    E-Print Network [OSTI]

    Han, Jerry; Calvin, Melvin.

    2008-01-01T23:59:59.000Z

    ALKANES FROM BLUE-GREEN ALGAE RECEIV r -· LAWREW RADIATIONAlkanes From Blue-Green Algae by Jerry Han and Oep~rtment l~alkanes from blue-green algae were separated on a The

  8. BRANCHED ALKANES FROM BLUE-GREEN ALGAE

    E-Print Network [OSTI]

    Han, Jerry; Calvin, Melvin.

    2008-01-01T23:59:59.000Z

    ~ BRANCHED ALKANES FROM BLUE-GREEN ALGAE RECEIV r -· LAWREWBranched Alkanes From Blue-Green Algae by Jerry Han and Oep~Branched alkanes from blue-green algae were separated on a

  9. CRITICAL INFRASTRUCTURE PROTECTION Multiple Efforts to Secure...

    Energy Savers [EERE]

    CRITICAL INFRASTRUCTURE PROTECTION Multiple Efforts to Secure Control Systems Are Under Way, but Challenges Remain CRITICAL INFRASTRUCTURE PROTECTION Multiple Efforts to Secure...

  10. Hydrogen Infrastructure Transition Analysis: Milestone Report

    SciTech Connect (OSTI)

    Melendez, M.; Milbrandt, A.

    2006-01-01T23:59:59.000Z

    This milestone report identifies a minimum infrastructure that could support the introduction of hydrogen vehicles and develops and evaluates transition scenarios supported by this infrastructure.

  11. Sandia Energy - Cyber Security for Electric Infrastructure

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cyber Security for Electric Infrastructure Home Stationary Power Grid Modernization Cyber Security for Electric Infrastructure Cyber Security for Electric Infrastructureashoter2015...

  12. Hydrogen, Fuel Cells and Infrastructure Technologies Program...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydrogen, Fuel Cells and Infrastructure Technologies Program: 2002 Annual Progress Report Hydrogen, Fuel Cells and Infrastructure Technologies Program: 2002 Annual Progress Report...

  13. Hydrogen, Fuel Cells and Infrastructure Technologies Program...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydrogen, Fuel Cells and Infrastructure Technologies Program FY2003 Merit Review and Peer Evaluation Report Hydrogen, Fuel Cells and Infrastructure Technologies Program FY2003...

  14. 2nd International Hydrogen Infrastructure Challenges Webinar...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    nd International Hydrogen Infrastructure Challenges Webinar Slides 2nd International Hydrogen Infrastructure Challenges Webinar Slides Presentation slides from the Fuel Cell...

  15. Refueling Infrastructure for Alternative Fuel Vehicles: Lessons...

    Broader source: Energy.gov (indexed) [DOE]

    Refueling Infrastructure for Alternative Fuel Vehicles: Lessons Learned for Hydrogen Refueling Infrastructure for Alternative Fuel Vehicles: Lessons Learned for Hydrogen On April...

  16. Voluntary Protection Program Onsite Review, Infrastructure Support...

    Office of Environmental Management (EM)

    2013 Voluntary Protection Program Onsite Review, Infrastructure Support Contract Paducah Gaseous Diffusion Plant - May 2013 May 2013 Evaluation to determine whether Infrastructure...

  17. California Low Carbon Fuels Infrastructure Investment Initiative...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Low Carbon Fuels Infrastructure Investment Initiative California Low Carbon Fuels Infrastructure Investment Initiative 2012 DOE Hydrogen and Fuel Cells Program and Vehicle...

  18. Natural Gas and Hydrogen Infrastructure Opportunities Workshop...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Opportunities Workshop Agenda Natural Gas and Hydrogen Infrastructure Opportunities Workshop Agenda Agenda for the Natural Gas and Hydrogen Infrastructure Opportunities Workshop...

  19. Final Report - Hydrogen Delivery Infrastructure Options Analysis...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - Hydrogen Delivery Infrastructure Options Analysis Final Report - Hydrogen Delivery Infrastructure Options Analysis This report, by the Nexant team, documents an in-depth analysis...

  20. Hydrogen Vehicle and Infrastructure Demonstration and Validation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vehicle and Infrastructure Demonstration and Validation Hydrogen Vehicle and Infrastructure Demonstration and Validation 2009 DOE Hydrogen Program and Vehicle Technologies Program...

  1. State Experience in Hydrogen Infrastructure in California

    Broader source: Energy.gov (indexed) [DOE]

    Experience in Hydrogen Infrastructure in California Gerhard H Achtelik Jr. February 17, 2011 Hydrogen Infrastructure Market Readiness Workshop California Environmental Protection...

  2. EV Everywhere Grand Challenge - Charging Infrastructure Enabling...

    Office of Environmental Management (EM)

    Charging Infrastructure Enabling Flexible EV Design EV Everywhere Grand Challenge - Charging Infrastructure Enabling Flexible EV Design Presentation given at the EV Everywhere...

  3. Microsoft PowerPoint - States Project Map.pptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Infrastructure (Regional Carbon Sequestration Partnership) Projects Locations of Performing Organizations *Project location may be different than location of Primary Performer 1 05...

  4. 21073CAMENABC 5/11 Anthem Blue Cross is the trade name of Blue Cross of California. Anthem Blue Cross and Anthem Blue Cross Life and Health Insurance Company are independent licensees of the Blue Cross Association.

    E-Print Network [OSTI]

    Rose, Michael R.

    21073CAMENABC 5/11 Anthem Blue Cross is the trade name of Blue Cross of California. Anthem Blue Cross and Anthem Blue Cross Life and Health Insurance Company are independent licensees of the Blue Cross Association. ® ANTHEM is a registered trademark of Anthem Insurance Companies, Inc. The Blue Cross

  5. Multistage Stochastic Programming Approach for Offshore Oilfield Infrastructure Planning

    E-Print Network [OSTI]

    Grossmann, Ignacio E.

    Multistage Stochastic Programming Approach for Offshore Oilfield Infrastructure Planning under is implemented in the GAMS grid computing environment. Computational results on a variety of oilfield development cycle of a typical offshore oilfield project consists of the following five steps: (1) Exploration

  6. S E R I E S SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES

    E-Print Network [OSTI]

    S E R I E S SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES COMMISSION General Committee Final workshop Ispra (IT), May 30 th, 2013 MAID project : Seismic behavior of L- and T-shaped unreinforced Masonry shear walls including Acoustic Isolation Devices #12;SEISMIC ENGINEERING RESEARCH

  7. Hydrogen Delivery Infrastructure Options Analysis

    Fuel Cell Technologies Publication and Product Library (EERE)

    This report, by the Nexant team, documents an in-depth analysis of seven hydrogen delivery options to identify the most cost-effective hydrogen infrastructure for the transition and long term. The pro

  8. Degree design of coupled infrastructures

    E-Print Network [OSTI]

    Hover, Franz S.

    2011-01-01T23:59:59.000Z

    A recent asymptotic model of cascading failure in two-domain, coupled infrastructures is used to pose and solve a specific degree-distribution design problem. Low-order non-linear analysis exposes the mechanisms by which ...

  9. Modeling hydrogen fuel distribution infrastructure

    E-Print Network [OSTI]

    Pulido, Jon R. (Jon Ramon), 1974-

    2004-01-01T23:59:59.000Z

    This thesis' fundamental research question is to evaluate the structure of the hydrogen production, distribution, and dispensing infrastructure under various scenarios and to discover if any trends become apparent after ...

  10. Theory of Polar Blue Phases

    E-Print Network [OSTI]

    Shaikh M. Shamid; David W. Allender; Jonathan V. Selinger

    2014-05-22T23:59:59.000Z

    In liquid crystals, if flexoelectric couplings between polar order and director gradients are strong enough, the uniform nematic phase can become unstable to formation of a modulated polar phase. Previous theories have predicted two types of modulation, twist-bend and splay-bend; the twist-bend phase has been found in recent experiments. Here, we investigate other types of modulation, using lattice simulations and Landau theory. In addition to twist-bend and splay-bend, we also find polar blue phases, with 2D or 3D modulations of both director and polar order. We compare polar blue phases with chiral blue phases, and discuss opportunities for observing them experimentally.

  11. Strategic plan for infrastructure optimization

    SciTech Connect (OSTI)

    Donley, C.D.

    1998-05-27T23:59:59.000Z

    This document represents Fluor Daniel Hanford`s and DynCorp`s Tri-Cities Strategic Plan for Fiscal Years 1998--2002, the road map that will guide them into the next century and their sixth year of providing safe and cost effective infrastructure services and support to the Department of Energy (DOE) and the Hanford Site. The Plan responds directly to the issues raised in the FDH/DOE Critical Self Assessment specifically: (1) a strategy in place to give DOE the management (systems) and physical infrastructure for the future; (2) dealing with the barriers that exist to making change; and (3) a plan to right-size the infrastructure and services, and reduce the cost of providing services. The Plan incorporates initiatives from several studies conducted in Fiscal Year 1997 to include: the Systems Functional Analysis, 200 Area Water Commercial Practices Plan, $ million Originated Cost Budget Achievement Plan, the 1OO Area Vacate Plan, the Railroad Shutdown Plan, as well as recommendations from the recently completed Review of Hanford Electrical Utility. These and other initiatives identified over the next five years will result in significant improvements in efficiency, allowing a greater portion of the infrastructure budget to be applied to Site cleanup. The Plan outlines a planning and management process that defines infrastructure services and structure by linking site technical base line data and customer requirements to work scope and resources. The Plan also provides a vision of where Site infrastructure is going and specific initiatives to get there.

  12. 2012 Annual Report Research Reactor Infrastructure Program

    SciTech Connect (OSTI)

    Douglas Morrell

    2012-11-01T23:59:59.000Z

    The content of this report is the 2012 Annual Report for the Research Reactor Infrastructure Program.

  13. Controlled Hydrogen Fleet and Infrastructure Analysis (Presentation)

    SciTech Connect (OSTI)

    Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.

    2010-06-10T23:59:59.000Z

    This presentation summarizes controlled hydrogen fleet & infrastructure analysis undertaken for the DOE Fuel Cell Technologies Program.

  14. Blue Ribbon Panel Recommendations Report

    Broader source: Energy.gov [DOE]

    The Department of Energy's Geothermal Technologies Office (formerly Geothermal Technologies Program) assembled a geothermal Blue Ribbon Panel on March 22-23, 2011 in Albuquerque, New Mexico for a...

  15. Towards a systematic analysis of cluster computing log data: the case of IBM BlueGene/Q

    E-Print Network [OSTI]

    Towards a systematic analysis of cluster computing log data: the case of IBM BlueGene/Q Alina S^irbu, Ozalp Babaoglu Department of Computer Science and Engineering, University of Bologna Mura Anteo Zamboni and complexity of managing large comput- ing infrastructures has been on the rise. Automating management actions

  16. Puget Sound Clean Cities Petroleum Reduction Project

    Broader source: Energy.gov (indexed) [DOE]

    fueling station efforts on user fleet satisfaction and limit grant project scope to pipeline CNG fueling infrastructure Vehicles Deployed * 237 CNG vehicles retro-fitted and...

  17. Columbia Blue Furnald MathematicsLewisohn

    E-Print Network [OSTI]

    Hone, James

    Columbia Blue #12;Furnald MathematicsLewisohn Dodge Miller Theatre Kent International Affairs Columbia Blue Blue View: Part I 4 Exponential Education 10 Columbia Days 26 Common Core, 44 Uncommon 72 Columbia Engineering 78 Community, Columbia Style 84 Columbia Moments: 100 Tried and True Blue

  18. STOCK ASSESSMENT OF THE BLUE CRAB

    E-Print Network [OSTI]

    STOCK ASSESSMENT OF THE BLUE CRAB IN CHESAPEAKE BAY 2011 #12;2011 Stock assessment for blue crab in Chesapeake Bay iii Executive Summary The blue crab (Callinectes sapidus) is an icon for the Chesapeake Bay region. The commercial fisheries for blue crab in the Bay remain one of the most valuable fishery sectors

  19. The Blue Language1 Michael Klling

    E-Print Network [OSTI]

    Kent, University of

    1 The Blue Language1 Michael Kölling School of Computer Science and Software Engineering Monash. The system we are about to discuss is named Blue. Blue is an integrated programming environment and an object. In this issue, we discuss the language aspects of Blue. Next month we will continue the discussion by describing

  20. 1) Anthem Blue Dental PPO Plus 2) Anthem Blue Dental PPO

    E-Print Network [OSTI]

    - 35 - 1) Anthem Blue Dental PPO Plus 2) Anthem Blue Dental PPO DENTAL INSURANCE ANTHEM BLUE CROSS AND BLUE SHIELD You may select from two separate dental care plans to meet your individual needs. Premium Resources/Benefits Office for additional information. ANTHEM BLUE DENTAL PPO PLUS This dental plan offers

  1. On the structure of blue phase III

    E-Print Network [OSTI]

    O. Henrich; K. Stratford; M. E. Cates; D. Marenduzzo

    2011-10-31T23:59:59.000Z

    We report large scale simulations of the blue phases of cholesteric liquid crystals. Our results suggest a structure for blue phase III, the blue fog, which has been the subject of a long debate in liquid crystal physics. We propose that blue phase III is an amorphous network of disclination lines, which is thermodynamically and kinetically stabilised over crystalline blue phases at intermediate chiralities}. This amorphous network becomes ordered under an applied electric field, as seen in experiments.

  2. Hydrogen, Fuel Cells & Infrastructure Technologies ProgramHydrogen, Fuel Cells & Infrastructure Technologies Program Program Overview

    E-Print Network [OSTI]

    Hydrogen, Fuel Cells & Infrastructure Technologies ProgramHydrogen, Fuel Cells & Infrastructure.5Hydrogen, Fuel Cells & Infrastructure Technologies Program (EERE) President's Office of Science Berkeley, California #12;President Bush Launches the Hydrogen Fuel Initiative "Tonight I am proposing $1

  3. Towards Truly Ubiquitous and Opportunistic Trust Infrastructures: Position for Next Generation Cybersecurity Infrastructure Workshop

    E-Print Network [OSTI]

    Tennessee, University of

    : Position for Next Generation Cybersecurity Infrastructure Workshop Stephen Nightingale Generation Cybersecurity Infrastructure workshop, we note that Federated Identities [1 ubiquitous and opportunistic, single rooted trust infrastructure is emerging. Its

  4. Blue-green upconversion laser

    DOE Patents [OSTI]

    Nguyen, Dinh C. (Los Alamos, NM); Faulkner, George E. (Los Alamos, NM)

    1990-01-01T23:59:59.000Z

    A blue-green laser (450-550 nm) uses a host crystal doped with Tm.sup.3+. The Tm.sup.+ is excited through upconversion by a red pumping laser and an IR pumping laser to a state which transitions to a relatively lower energy level through emissions in the blue-green band, e.g., 450.20 nm at 75 K. The exciting laser may be tunable dye lasers or may be solid-state semiconductor laser, e.g., GaAlAs and InGaAlP.

  5. Blue light emitting thiogallate phosphor

    DOE Patents [OSTI]

    Dye, Robert C. (Los Alamos, NM); Smith, David C. (Los Alamos, NM); King, Christopher N. (Portland, OR); Tuenge, Richard T. (Hillsboro, OR)

    1998-01-01T23:59:59.000Z

    A crystalline blue emitting thiogallate phosphor of the formula RGa.sub.2 S.sub.4 :Ce.sub.x where R is selected from the group consisting of calcium, strontium, barium and zinc, and x is from about 1 to 10 atomic percent, the phosphor characterized as having a crystalline microstructure on the size order of from about 100 .ANG. to about 10,000 .ANG. is provided together with a process of preparing a crystalline blue emitting thiogallate phosphor by depositing on a substrate by CVD and resultant thin film electroluminescent devices including a layer of such deposited phosphor on an ordinary glass substrate.

  6. Blue-green upconversion laser

    DOE Patents [OSTI]

    Nguyen, D.C.; Faulkner, G.E.

    1990-08-14T23:59:59.000Z

    A blue-green laser (450--550 nm) uses a host crystal doped with Tm[sup 3+]. The Tm[sup 3+] is excited through upconversion by a red pumping laser and an IR pumping laser to a state which transitions to a relatively lower energy level through emissions in the blue-green band, e.g., 450.20 nm at 75 K. The exciting laser may be tunable dye lasers or may be solid-state semiconductor laser, e.g., GaAlAs and InGaAlP. 3 figs.

  7. Networks, deregulation, and risk : the politics of critical infrastructure protection

    E-Print Network [OSTI]

    Ellis, Ryan Nelson

    2011-01-01T23:59:59.000Z

    Post, electric power, and rail, like most infrastructures,Post, electric power, and rail, like most infrastructuresElectric Power .. 349 Conclusion: The Politics of Critical Infrastructure

  8. Optimal Dynamic Strategy of Building a Hydrogen Infrastructure in Beijing

    E-Print Network [OSTI]

    Lin, Zhenhong; Ogden, Joan M; Fan, Yueyue; Sperling, Dan

    2005-01-01T23:59:59.000Z

    of Building a Hydrogen Infrastructure in Beijing Zhenhongthe on-going Hydrogen Infrastructure Transition (HIT)build up a regional hydrogen infrastructure while minimizing

  9. Participatory infrastructure monitoring : design factors and limitations of accountability technologies

    E-Print Network [OSTI]

    Offenhuber, Dietmar

    2014-01-01T23:59:59.000Z

    This dissertation investigates practices of participatory infrastructure monitoring and their implications for the governance of urban infrastructure services. By introducing the concept of infrastructure legibility, the ...

  10. BUILDING INSPECTION Building, Infrastructure, Transportation

    E-Print Network [OSTI]

    BUILDING INSPECTION Building, Infrastructure, Transportation City of Redwood City 1017 Middlefield Sacramento, Ca 95814-5514 Re: Green Building Ordinance and the Building Energy Efficiency Standards Per of Redwood City enforce the current Title 24 Building Energy Efficiency Standards as part

  11. Blue whale response to underwater noise from commercial ships

    E-Print Network [OSTI]

    McKenna, Megan Frances

    2011-01-01T23:59:59.000Z

    hydrodynamics and energetics of blue whale lunge feeding:2010. Association between Blue Whale (Balaenoptera musculus)and calling behavior of blue whales from a suction-cup-

  12. Nevada Geothermal Power Company, Inc. (Blue Mountain) | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nevada Geothermal Power Company, Inc. (Blue Mountain) Nevada Geothermal Power Company, Inc. (Blue Mountain) Nevada Geothermal Power Company, Inc. (Blue Mountain) Nevada Geothermal...

  13. Poliosis overlying a nevus with blue nevus features

    E-Print Network [OSTI]

    Young, Lorraine C; Dyke, Gregory S Van; Lipton, Shira; Binder, Scott W

    2008-01-01T23:59:59.000Z

    overlying a nevus with blue nevus features. Acknowledgement:Poliosis overlying a nevus with blue nevus features Lorrainewith congenital as well as blue nevus features. To the best

  14. Blue oak enhance soil quality in California oak woodlands

    E-Print Network [OSTI]

    Dahlgren, Randy; Horwath, William; Tate, Kenneth W; Camping, Trina

    2004-01-01T23:59:59.000Z

    Kay BL 1987. The effect of blue oak re- moval on herbaceousmitigate habitat loss in blue oak woodlands. In: Standifordremoval in California blue oak woodlands. In: Standiford RB,

  15. Blue oak enhance soil quality in California oak woodlands

    E-Print Network [OSTI]

    Dahlgren, Randy A.; Horwath, William R.; Tate, Kenneth W.; Camping, Trina J.

    2003-01-01T23:59:59.000Z

    Kay BL 1987. The effect of blue oak re- moval on herbaceousmitigate habitat loss in blue oak woodlands. In: Standifordremoval in California blue oak woodlands. In: Standiford RB,

  16. Bikenomics: How Bicycling Can Save the Economy By Elly Blue

    E-Print Network [OSTI]

    Barajas, Jesus M.

    2014-01-01T23:59:59.000Z

    Save the Economy By Elly Blue Microcosm, 2013 Reviewed bymaking standard, in Bikenomics Elly Blue delivers a pro-bikebicycle advocate, Elly Blue backs her claims with research

  17. "Mapping" Nonprofit Infrastructure Organizations in Texas

    E-Print Network [OSTI]

    Aho, Andrea; Harris, Amanda; Kessel, Kendall; Park, Jongsoo; Park, Jong Taek; Rios, Lisa; Swendig, Brett

    2010-01-01T23:59:59.000Z

    The stability of the nonprofit sector and its ability to meet our nation‘s needs in an era of unprecedented challenges requires a solid nonprofit infrastructure (Brown, et al., 2008). These organizations that comprise this infrastructure system work...

  18. National Environmental Information Infrastructure Reference Architecture

    E-Print Network [OSTI]

    Greenslade, Diana

    National Environmental Information Infrastructure Reference Architecture Consultation Draft Environmental Information Infrastructure Reference Architecture: Consultation Draft Environmental Information Architecture: Consultation Draft, Bureau of Meteorology, Canberra, Australia, pp. 52. With the exception

  19. The Hydrogen Infrastructure Transition Model (HIT) & Its Application in Optimizing a 50-year Hydrogen Infrastructure for Urban Beijing

    E-Print Network [OSTI]

    Lin, Zhenhong; Ogden, J; Fan, Yueyue; Sperling, Dan

    2006-01-01T23:59:59.000Z

    Zoia (2005). "Hydrogen infrastructure strategic planningITS—RR—06—05 The Hydrogen Infrastructure Transition Model (a 50-year Hydrogen Infrastructure for Urban Beijing Zhenhong

  20. The Hydrogen Infrastructure Transition (HIT) Model and Its Application in Optimizing a 50-year Hydrogen Infrastructure for Urban Beijing

    E-Print Network [OSTI]

    Lin, Zhenhong; Ogden, Joan M; Fan, Yueyue; Sperling, Dan

    2006-01-01T23:59:59.000Z

    Zoia (2005). "Hydrogen infrastructure strategic planningITS—RR—06—05 The Hydrogen Infrastructure Transition Model (a 50-year Hydrogen Infrastructure for Urban Beijing Zhenhong

  1. Microsoft Word - 2014 Infrastructure - Intro.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy - National Energy Technology Laboratory The Infrastructure (Regional Carbon Sequestration Partnerships) Technology Area highlights DOE's awareness of the...

  2. Office of National Infrastructure & Sustainability | National...

    National Nuclear Security Administration (NNSA)

    National Infrastructure & Sustainability | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing...

  3. Sandia National Laboratories: Smart power infrastructure

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Infrastructure Security, Materials Science, Partnership, Research & Capabilities, SMART Grid, Systems Engineering, Transmission Grid Integration Increasing consumer power...

  4. Controlled Hydrogen Fleet and Infrastructure Demonstration and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Fuel Cell Technologies Program Overview: 2012 DOE Hydrogen Compression, Storage, and Dispensing Workshop Refueling Infrastructure for...

  5. National Infrastructure Simulation and Analysis Center Overview

    SciTech Connect (OSTI)

    Berscheid, Alan P. [Los Alamos National Laboratory

    2012-07-30T23:59:59.000Z

    National Infrastructure Simulation and Analysis Center (NISAC) mission is to: (1) Improve the understanding, preparation, and mitigation of the consequences of infrastructure disruption; (2) Provide a common, comprehensive view of U.S. infrastructure and its response to disruptions - Scale & resolution appropriate to the issues and All threats; and (3) Built an operations-tested DHS capability to respond quickly to urgent infrastructure protection issues.

  6. Africa's Transport Infrastructure Mainstreaming Maintenance and...

    Open Energy Info (EERE)

    Mainstreaming Maintenance and Management Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Africa's Transport Infrastructure Mainstreaming Maintenance and Management...

  7. A modeling framework for investment planning in interdependent infrastructures in multi-hazard environments.

    SciTech Connect (OSTI)

    Brown, Nathanael J. K.; Gearhart, Jared Lee; Jones, Dean A.; Nozick, Linda Karen; Prince, Michael

    2013-09-01T23:59:59.000Z

    Currently, much of protection planning is conducted separately for each infrastructure and hazard. Limited funding requires a balance of expenditures between terrorism and natural hazards based on potential impacts. This report documents the results of a Laboratory Directed Research&Development (LDRD) project that created a modeling framework for investment planning in interdependent infrastructures focused on multiple hazards, including terrorism. To develop this framework, three modeling elements were integrated: natural hazards, terrorism, and interdependent infrastructures. For natural hazards, a methodology was created for specifying events consistent with regional hazards. For terrorism, we modeled the terrorist's actions based on assumptions regarding their knowledge, goals, and target identification strategy. For infrastructures, we focused on predicting post-event performance due to specific terrorist attacks and natural hazard events, tempered by appropriate infrastructure investments. We demonstrate the utility of this framework with various examples, including protection of electric power, roadway, and hospital networks.

  8. Energy Theft in the Advanced Metering Infrastructure

    E-Print Network [OSTI]

    McDaniel, Patrick Drew

    , with this infrastructure comes new risk. In this paper, we consider ad- versary means of defrauding the electrical gridEnergy Theft in the Advanced Metering Infrastructure Stephen McLaughlin, Dmitry Podkuiko, and Patrick McDaniel Systems and Internet Infrastructure Security Laboratory (SIIS) Pennsylvania State

  9. PROTECTING INFRASTRUCTURE ASSETS FROM REAL-TIME

    E-Print Network [OSTI]

    Burmester, Mike

    to critical infrastructure assets. The paper defines a threat model, an- alyzes vulnerabilities, proposes in an electricity grid. Also, it discusses the impact of run-time attacks on TC-compliant critical infrastructure. The crucial nature of the services provided by critical infrastructure systems and the vulnerabilities found

  10. Scanning the Technology Energy Infrastructure Defense Systems

    E-Print Network [OSTI]

    Amin, S. Massoud

    , and algorithmic develop- ments. Keywords--Critical infrastructure protection, electric power grid, emergency, the United Kingdom, and Italy in 2003 underscored electricity infrastructure's vulnerabilities [1 infrastructures and increased demand for high-quality and reliable electricity for our digital economy is becoming

  11. The X.509 Privilege Management Infrastructure

    E-Print Network [OSTI]

    Kent, University of

    Management Infrastructure (PMI) introduced in the 2000 edition of X.509. It describes the entities Management Infrastructure (PMI), and it enables privileges to be allocated, delegated, revoked and withdrawn in an electronic way. A PMI is to authorisation what a Public Key Infrastructure (PKI) is to authentication

  12. hen the legacy power infrastructure is aug-mented by a communication infrastructure, it

    E-Print Network [OSTI]

    Zhang, Yan

    hen the legacy power infrastructure is aug- mented by a communication infrastructure, it becomes information among different components of the power infrastructure. As a result, the power grid can operate into the power infrastructure will introduce many security challenges. For example, it is estimated that the data

  13. Performance characteristics of Jefferson Lab's new SRF infrastructure

    SciTech Connect (OSTI)

    Reece, Charles E. [JLAB; Denny, Philip [JLAB; Reilly, Anthony [JLAB

    2013-09-01T23:59:59.000Z

    In the past two years, Jefferson Lab has reconfigured and renovated its SRF support infrastructure as part of the Technology and Engineering Development Facility project, TEDF. The most significant changes are in the cleanroom and chemistry facilities. We report the initial characterization data on the new ultra-pure water systems, cleanroom facilities, describe the reconfiguration of existing facilities and also opportunities for flexible growth presented by the new arrangement.

  14. Public Project Revolving Fund (PPRF) (New Mexico)

    Broader source: Energy.gov [DOE]

    The New Mexico Finance Authority’s Public Project Revolving Fund (PPRF) funds infrastructure and capital equipment projects with low-cost and low-interest rate loans.  The key characteristics of...

  15. Clean Energy Infrastructure Educational Initiative

    SciTech Connect (OSTI)

    Hallinan, Kevin; Menart, James; Gilbert, Robert

    2012-08-31T23:59:59.000Z

    The Clean Energy Infrastructure Educational Initiative represents a collaborative effort by the University of Dayton, Wright State University and Sinclair Community College. This effort above all aimed to establish energy related programs at each of the universities while also providing outreach to the local, state-wide, and national communities. At the University of Dayton, the grant has aimed at: solidfying a newly created Masterâ??s program in Renewable and Clean Energy; helping to establish and staff a regional sustainability organization for SW Ohio. As well, as the prime grantee, the University of Dayton was responsible for insuring curricular sharing between WSU and the University of Dayton. Finally, the grant, through its support of graduate students, and through cooperation with the largest utilities in SW Ohio enabled a region-wide evaluation of over 10,000 commercial building buildings in order to identify the priority buildings in the region for energy reduction. In each, the grant has achieved success. The main focus of Wright State was to continue the development of graduate education in renewable and clean energy. Wright State has done this in a number of ways. First and foremost this was done by continuing the development of the new Renewable and Clean Energy Masterâ??s Degree program at Wright State . Development tasks included: continuing development of courses for the Renewable and Clean Energy Masterâ??s Degree, increasing the student enrollment, and increasing renewable and clean energy research work. The grant has enabled development and/or improvement of 7 courses. Collectively, the University of Dayton and WSU offer perhaps the most comprehensive list of courses in the renewable and clean energy area in the country. Because of this development, enrollment at WSU has increased from 4 students to 23. Secondly, the grant has helped to support student research aimed in the renewable and clean energy program. The grant helped to solidify new research in the renewable and clean energy area. The educational outreach provided as a result of the grant included activities to introduce renewable and clean energy design projects into the Mechanical and Materials Engineering senior design class, the development of a geothermal energy demonstration unit, and the development of renewable energy learning modules for high school students. Finally, this grant supported curriculum development by Sinclair Community College for seven new courses and acquisition of necessary related instrumentation and laboratory equipment. These new courses, EGV 1201 Weatherization Training, EGV 1251 Introduction to Energy Management Principles, EGV 2301 Commercial and Industrial Assessment, EGV 2351 LEED Green Associate Exam Preparation, EGV 2251 Energy Control Strategies, EGV Solar Photovoltaic Design and Installation, and EGV Solar Thermal Systems, enable Sinclair to offer complete Energy Technology Certificate and an Energy Management Degree programs. To date, 151 students have completed or are currently registered in one of the seven courses developed through this grant. With the increasing interest in the Energy Management Degree program, Sinclair has begun the procedure to have the program approved by the Ohio Board of Regents.

  16. Original article Blue-stain fungi associated

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Original article Blue-stain fungi associated with Tomicus piniperda in Sweden and preliminary to determine the development of blue-staining of sapwood. Fungi were isolated from samples of inner bark and blue-stained sapwood in connection with galleries of T piniperda. Samples were also taken from beetle

  17. Blue Waters: An Extraordinary Research Capability for

    E-Print Network [OSTI]

    Blue Waters: An Extraordinary Research Capability for Ad ancing Science & Engineering Frontiers will talk about the new supercomputer Blue Waters and its proposed use by the science and engineering of the University of Illinois at Urbana-Champaign. This system, called Blue Waters, is based on the latest computing

  18. PART A: TYPE OF COVERAGE HMO Colorado/Anthem Blue Cross and Blue Shield

    E-Print Network [OSTI]

    PART A: TYPE OF COVERAGE HMO Colorado/Anthem Blue Cross and Blue Shield Colorado Higher Education Insurance Benefits Alliance Trust Effective January 1, 2015 Blue Advantage HMO/Point-of-Service(POS) Plan and copayment options reflect the amount the covered person will pay. BlueAdvantage HMO

  19. The riddle of the blue-straggler stars Die Blauen Nachz uglersterne (blue-straggler

    E-Print Network [OSTI]

    The riddle of the blue-straggler stars Die Blauen Nachz uglersterne (blue-straggler stars) sind sequence beyond the turn o#11;. These so- called blue-straggler stars (BS) are quite common, they occur systems. Fig. 1 provides an example of an intermediate old open cluster with a rich blue

  20. Visualizing the Surface Infrastructure Used to Move 2 MtCO2/year from the Dakota Gasification Company to the Weyburn CO2 Enhanced Oil Recovery Project: Version of July 1, 2009

    SciTech Connect (OSTI)

    Dooley, James J.

    2009-07-09T23:59:59.000Z

    Google Earth Pro has been employed to create an interactive flyover of the world’s largest operational carbon dioxide capture and storage project. The visualization focuses on the transport and storage of 2 MtCO2/year which is captured from the Dakota Gasification Facility (Beula, North Dakota) and transported 205 miles and injected into the Weyburn oil field in Southeastern Saskatchewan.

  1. Infrastructure Ecology for Sustainable and Resilient Urban Infrastructure Design

    SciTech Connect (OSTI)

    Jeong, Hyunju [Georgia Institute of Technology; Pandit, Arka [Georgia Institute of Technology; Crittenden, John [Georgia Institute of Technology; Xu, Ming [University of Michigan; Perrings, Charles [Arizona State University; Wang, Dali [ORNL; Li, Ke [University of Georgia; French, Steve [Georgia Institute of Technology

    2010-10-01T23:59:59.000Z

    The population growth coupled with increasing urbanization is predicted to exert a huge demand on the growth and retrofit of urban infrastructure, particularly in water and energy systems. The U.S. population is estimated to grow by 23% (UN, 2009) between 2005 and 2030. The corresponding increases in energy and water demand were predicted as 14% (EIA, 2009) and 20% (Elcock, 2008), respectively. The water-energy nexus needs to be better understood to satisfy the increased demand in a sustainable manner without conflicting with environmental and economic constraints. Overall, 4% of U.S. power generation is used for water distribution (80%) and treatment (20%). 3% of U.S. water consumption (100 billion gallons per day, or 100 BGD) and 40% of U.S. water withdrawal (340 BGD) are for thermoelectric power generation (Goldstein and Smith, 2002). The water demand for energy production is predicted to increase most significantly among the water consumption sectors by 2030. On the other hand, due to the dearth of conventional water sources, energy intensive technologies are increasingly in use to treat seawater and brackish groundwater for water supply. Thus comprehending the interrelation and interdependency between water and energy system is imperative to evaluate sustainable water and energy supply alternatives for cities. In addition to the water-energy nexus, decentralized or distributed concept is also beneficial for designing sustainable water and energy infrastructure as these alternatives require lesser distribution lines and space in a compact urban area. Especially, the distributed energy infrastructure is more suited to interconnect various large and small scale renewable energy producers which can be expected to mitigate greenhouse gas (GHG) emissions. In the case of decentralized water infrastructure, on-site wastewater treatment facility can provide multiple benefits. Firstly, it reduces the potable water demand by reusing the treated water for non-potable uses and secondly, it also reduces the wastewater load to central facility. In addition, lesser dependency on the distribution network contributes to increased reliability and resiliency of the infrastructure. The goal of this research is to develop a framework which seeks an optimal combination of decentralized water and energy alternatives and centralized infrastructures based on physical and socio-economic environments of a region. Centralized and decentralized options related to water, wastewater and stormwater and distributed energy alternatives including photovoltaic (PV) generators, fuel cells and microturbines are investigated. In the context of the water-energy nexus, water recovery from energy alternatives and energy recovery from water alternatives are reflected. Alternatives recapturing nutrients from wastewater are also considered to conserve depleting resources. The alternatives are evaluated in terms of their life-cycle environmental impact and economic performance using a hybrid life cycle assessment (LCA) tool and cost benefit analysis, respectively. Meeting the increasing demand of a test bed, an optimal combination of the alternatives is designed to minimize environmental and economic impacts including CO2 emissions, human health risk, natural resource use, and construction and operation cost. The framework determines the optimal combination depending on urban density, transmission or conveyance distance or network, geology, climate, etc. Therefore, it will be also able to evaluate infrastructure resiliency against physical and socio-economic challenges such as population growth, severe weather, energy and water shortage, economic crisis, and so on.

  2. Confined Cubic Blue Phases under Shear

    E-Print Network [OSTI]

    O. Henrich; K. Stratford; D. Marenduzzo; P. V. Coveney; M. E. Cates

    2012-03-14T23:59:59.000Z

    We study the behaviour of confined cubic blue phases under shear flow via lattice Boltzmann simulations. We focus on the two experimentally observed phases, blue phase I and blue phase II. The disinclination network of blue phase II continuously breaks and reforms under shear, leading to an oscillatory stress response in time. The oscillations are only regular for very thin samples. For thicker samples, the shear leads to a "stick-slip" motion of part of the network along the vorticity direction. Blue phase I responds very differently: its defect network undergoes seemingly chaotic rearrangements under shear, irrespective of system size.

  3. Rheology of cholesteric blue phases

    E-Print Network [OSTI]

    A. Dupuis; D. Marenduzzo; E. Orlandini; J. M. Yeomans

    2006-05-11T23:59:59.000Z

    Blue phases of cholesteric liquid crystals offer a spectacular example of naturally occurring disclination line networks. Here we numerically solve the hydrodynamic equations of motion to investigate the response of three types of blue phases to an imposed Poiseuille flow. We show that shear forces bend and twist and can unzip the disclination lines. Under gentle forcing the network opposes the flow and the apparent viscosity is significantly higher than that of an isotropic liquid. With increased forcing we find strong shear thinning corresponding to the disruption of the defect network. As the viscosity starts to drop, the imposed flow sets the network into motion. Disclinations break-up and re-form with their neighbours in the flow direction. This gives rise to oscillations in the time-dependent measurement of the average stress.

  4. 1370 Rev. (3/03) An independent licensee of the Blue Cross and Blue Shield Association. Anthem Blue Cross and Blue Shield is the trade name of Anthem Health Plans of New Hampshire, Inc.

    E-Print Network [OSTI]

    Myers, Lawrence C.

    1370 Rev. (3/03) An independent licensee of the Blue Cross and Blue Shield Association. Anthem Blue Cross and Blue Shield is the trade name of Anthem Health Plans of New Hampshire, Inc. ® Registered marks of the Blue Cross and Blue Shield Association. Request for Certification for a Mentally or Physically

  5. FY 2006 budget responses: Subbasin planning responses only Blue Mountain Asotin

    E-Print Network [OSTI]

    FY 2006 budget responses: Subbasin planning responses only Blue Mountain Asotin 1994-018-05 - Asotin Enhancement/Restoration (Expense) Consistency with subbasin plans This project is consistent-050-00 - Riparian Buffer Couse/Ten Mile (Expense) Consistency with subbasin plans This project is consistent

  6. Inflation and Alternatives with Blue Tensor Spectra

    E-Print Network [OSTI]

    Yi Wang; Wei Xue

    2014-10-20T23:59:59.000Z

    We study the tilt of the primordial gravitational waves spectrum. A hint of blue tilt is shown from analyzing the BICEP2 and POLARBEAR data. Motivated by this, we explore the possibilities of blue tensor spectra from the very early universe cosmology models, including null energy condition violating inflation, inflation with general initial conditions, and string gas cosmology, etc. For the simplest G-inflation, blue tensor spectrum also implies blue scalar spectrum. In general, the inflation models with blue tensor spectra indicate large non-Gaussianities. On the other hand, string gas cosmology predicts blue tensor spectrum with highly Gaussian fluctuations. If further experiments do confirm the blue tensor spectrum, non-Gaussianity becomes a distinguishing test between inflation and alternatives.

  7. Infrastructure development assistance modeling for nuclear power plant

    SciTech Connect (OSTI)

    Park, J. H.; Hwang, K.; Park, K. M.; Kim, S. W.; Lee, S. M. [Korea Hydro and Nuclear Power Co., LTD, 23, 106 gil, Yeongdong-daero, Gangnam-gu, 153-791 (Korea, Republic of)

    2012-07-01T23:59:59.000Z

    The purpose of this paper is to develop a model, a general frame to be utilized in assisting newcomer countries to start a nuclear power program. A nuclear power plant project involves technical complexity and high level of investment with long duration. Considering newcomers are mostly developing countries that lack the national infrastructure, key infrastructure issues may constitute the principal constraints to the development of a nuclear power program. In this regard, it is important to provide guidance and support to set up an appropriate infrastructure when we help them with the first launch of nuclear power plant project. To date, as a sole nuclear power generation company, KHNP has been invited many times to mentor or assist newcomer countries for their successful start of a nuclear power program since Republic of Korea is an exemplary case of a developing country which began nuclear power program from scratch and became a major world nuclear energy country in a short period of time. Through hosting events organized to aid newcomer countries' initiation of nuclear power projects, difficulties have been recognized. Each event had different contents according to circumstances because they were held as an unstructured and one-off thing. By developing a general model, we can give more adequate and effective aid in an efficient way. In this paper, we created a model to identify necessary infrastructures at the right stage, which was mainly based on a case of Korea. Taking into account the assistance we received from foreign companies and our own efforts for technological self-reliance, we have developed a general time table and specified activities required to do at each stage. From a donor's perspective, we explored various ways to help nuclear infrastructure development including technical support programs, training courses, and participating in IAEA technical cooperation programs on a regular basis. If we further develop the model, the next task would be to make the model more sophisticated as a 'semi-tailored model' so that it can be applied to a certain country reflecting its unique conditions. In accordance with its degree of established infrastructure, we can adjust or modify the model. Despite lots of benefits of using this model, there remain limitations such as time and budget constraints. These problems, however, can be addressed by cooperating with international organization such as the IAEA and other companies that share the same goal of helping newcomer countries introduce nuclear power. (authors)

  8. Infrastructure

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC) EnvironmentalGyroSolé(tm)HydrogenRFPTri-Party AgreementInfrared Mapping

  9. infrastructure

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA Approved:AdministrationAnalysisDarby Dietrich5 |0/%2A0/%2Agtri

  10. Infrastructure

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHigh SchoolIn Other News link toInfluenceInfrared Mapping HelpsMicro-grid

  11. Infrastructure

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHigh SchoolIn Other News link toInfluenceInfrared Mapping

  12. South Mississippi Electric Power Association Smart Grid Project (Mississippi)

    Broader source: Energy.gov [DOE]

    South Mississippi Electric Power Association’s (SMEPA) smart grid project involves the deployment of advanced metering infrastructure (AMI) and covers the Generation and Transmission (G&T)...

  13. adaptation project pay: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    is adapting Linux for use in enterprise-scale networking Michigan, University of 445 Siemens Global Studio Project: Experiences Adopting an Integrated GSD Infrastructure...

  14. Hydrogen, Fuel Cells & Infrastructure Technologies

    E-Print Network [OSTI]

    Techno-Economic Analysis of H2 Production by Gasification of Biomass, GTI 2.60 v Project completed. 31 Project Completed Summary Comment 1 H2 from Biomass: Catalytic Reforming of Pyrolysis Vapors, NREL 3.28 v Water Gas Shift, NREL 3.23 v Project funding discontinued based on unfavorable economic analysis. 6

  15. Sandia Energy - Water Infrastructure Security

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of ScienceandMesa del Sol Home DistributionTransportation Safety Home StationaryUpperWakeInfrastructure

  16. Blue Mountain, Humboldt County, Nevada, U.S.A

    SciTech Connect (OSTI)

    Ted Fitzpatrick, Brian D. Fairbank

    2005-04-01T23:59:59.000Z

    The report documents the drilling of well Deep Blue No.2, the second deep geothermal test hole at the Blue Mountain Geothermal Area, Humboldt County, Nevada. The well was drilled by Noramex Corp, a Nevada company, with funding support from the US Department of Energy, under the DOE’s GRED II Program. Deep Blue No.2 was drilled as a ‘step-out’ hole from Deep Blue No.1, to further evaluate the commercial potential of the geothermal resource. Deep Blue No.2 was designed as a vertical, slim observation test hole to a nominal target depth of 1000 meters (nominal 3400 feet). The well tests an area of projected high temperatures at depth, from temperature gradients measured in a group of shallow drill holes located approximately one kilometer to the northeast of observation hole Deep Blue No.1. The well is not intended for, or designed as, a commercial well or a production well. Deep Blue No.2 was spudded on March 25, 2004 and completed to a total depth of 1127.76m (3700 ft) on April 28, 2004. The well was drilled using conventional rotary drilling techniques to a depth of 201.17 m (660 ft), and continuously cored from 201.17m (660 ft) to 1127.76m (3700 ft). A brief rig-on flow-test was conducted at completion to determine basic reservoir parameters and obtain fluid samples. A permeable fracture zone with measured temperatures of 150 to 167°C (302 to 333°F) occurs between 500 to 750m (1640 to 2461ft). The well was left un-lined in anticipation of the Phase III - Flow and Injection Testing. A further Kuster temperature survey was attempted after the well had been shut in for almost 3 weeks. The well appears to have bridged off at 439m (1440ft) as the Kuster tool was unable to descend past this point. Several attempts to dislodge the obstruction using tube jars were unsuccessful. Deep Blue No.2 encountered variably fractured and veined, fine-grained rocks of the Singas Formation, and intruded by minor strongly altered fine-grained felsic dikes, and less altered fineto medium-grained felsic to intermediate dikes. Widespread open fractures and extensive of quartz veining in many intervals of the core indicate a high degree of fracturing and flow of silica-bearing fluids, almost certainly hotter than 200°C (392°F), at some time, but these fractures are now partially sealed. Intervals of soft shaly mudstone, common clay gouge, and rocks with generally low permeability (few veins and fractures) may also form a seal or ‘cap’ above the main high temperature reservoir at Blue Mountain. The encouraging results from Deep Blue No.2 support further drilling at Blue Mountain. Higher temperature fluids can be expected where fractures providing channels for the circulation of hot water from depth have not been sealed extensively by silica deposition.

  17. Cyber Threats to Nuclear Infrastructures

    SciTech Connect (OSTI)

    Robert S. Anderson; Paul Moskowitz; Mark Schanfein; Trond Bjornard; Curtis St. Michel

    2010-07-01T23:59:59.000Z

    Nuclear facility personnel expend considerable efforts to ensure that their facilities can maintain continuity of operations against both natural and man-made threats. Historically, most attention has been placed on physical security. Recently however, the threat of cyber-related attacks has become a recognized and growing world-wide concern. Much attention has focused on the vulnerability of the electric grid and chemical industries to cyber attacks, in part, because of their use of Supervisory Control and Data Acquisition (SCADA) systems. Lessons learned from work in these sectors indicate that the cyber threat may extend to other critical infrastructures including sites where nuclear and radiological materials are now stored. In this context, this white paper presents a hypothetical scenario by which a determined adversary launches a cyber attack that compromises the physical protection system and results in a reduced security posture at such a site. The compromised security posture might then be malevolently exploited in a variety of ways. The authors conclude that the cyber threat should be carefully considered for all nuclear infrastructures.

  18. 2nd International Hydrogen Infrastructure Challenges Webinar

    Broader source: Energy.gov [DOE]

    Text version and video recording of the webinar titled "2nd International Hydrogen Infrastructure Challenges Webinar," originally presented on March 10, 2015.

  19. Hydrogen Delivery Infrastructure Analysis, Options and Trade...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Analysis, Options and Trade-offs, Transition and Long-term Hydrogen Delivery Infrastructure Analysis, Options and Trade-offs, Transition and Long-term Presentation on Hydrogen...

  20. Africa Infrastructure Country Diagnostic Documents: Interactive...

    Open Energy Info (EERE)

    Interactive MAP in PDF, all Countries Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Africa Infrastructure Country Diagnostic Documents: Interactive MAP in PDF, all...

  1. Hydrogen Infrastructure Market Readiness: Opportunities and Potential...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Opportunities and Potential for Near-term Cost Reductions. Proceedings of the Hydrogen Infrastructure Market Readiness Workshop and Summary of Feedback Provided through the...

  2. Sandia National Laboratories: Hydrogen Fueling Infrastructure...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Station Technology Linde, Sandia Partnership Looks to Expand Hydrogen Fueling Network On February 26, 2015, in Center for Infrastructure Research and Innovation (CIRI), Energy,...

  3. Department of Energy Cites Parsons Infrastructure & Technology...

    Broader source: Energy.gov (indexed) [DOE]

    Parsons Infrastructure & Technology Group, Inc. for violations of DOE's worker safety and health regulations with a proposed civil penalty of 70,000. The violations are associated...

  4. Natural Gas and Hydrogen Infrastructure Opportunities Workshop...

    Broader source: Energy.gov (indexed) [DOE]

    * Convene industry and other stakeholders to share current statusstate-of-the art for natural gas and hydrogen infrastructure. * Identify key challenges (both technical and...

  5. Alternative Ways of Financing Infrastructure Investment: Potential...

    Open Energy Info (EERE)

    'Novel' Financing Models Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Alternative Ways of Financing Infrastructure Investment: Potential for 'Novel' Financing Models...

  6. Sandia National Laboratories: "smart water" infrastructure

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    "smart water" infrastructure Sandians Published in American Chemical Society's Environmental Science & Technology On December 11, 2014, in Analysis, Climate, Energy, Global Climate...

  7. Geographically Based Hydrogen Demand and Infrastructure Rollout...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rollout Scenario Analysis Geographically Based Hydrogen Demand and Infrastructure Rollout Scenario Analysis Presentation by Margo Melendez at the 2010-2025 Scenario Analysis for...

  8. Geographically Based Hydrogen Demand and Infrastructure Analysis...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Analysis Geographically Based Hydrogen Demand and Infrastructure Analysis Presentation by NREL's Margo Melendez at the 2010 - 2025 Scenario Analysis for Hydrogen Fuel Cell Vehicles...

  9. Sandia National Laboratories: accelerate hydrogen infrastructure...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    accelerate hydrogen infrastructure technologies Energy Department Awards 7M to Advance Hydrogen Storage Systems On June 12, 2014, in CRF, Energy, Energy Storage, Energy Storage...

  10. Electric Vehicle Charging Infrastructure Deployment Guidelines...

    Open Energy Info (EERE)

    to: navigation, search Tool Summary LAUNCH TOOL Name: Electric Vehicle Charging Infrastructure Deployment Guidelines: British Columbia AgencyCompany Organization: Natural...

  11. Refueling Infrastructure for Alternative Fuel Vehicles: Lessons...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Presented at Refueling Infrastructure for Alternative Fuel Vehicles: Lessons Learned for Hydrogen Conference, April 2-3, 2008, Sacramento, California fry.pdf More Documents &...

  12. Refueling Infrastructure for Alternative Fuel Vehicles: Lessons...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proceedings from the DOE sponsored Refueling Infrastructure for Alternative Fuel Vehicles: Lessons Learned for Hydrogen workshop to understand how lessons from past experiences can...

  13. IPHE Infrastructure Workshop - Workshop Proceedings, February...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vehicles and Hydrogen Fuel Stations Moving toward a commercial market for hydrogen fuel cell vehicles Fuel Cell Electric Vehicles and Hydrogen Infrastructure: Deployment and Issues...

  14. Sandia National Laboratories: fueling infrastructure development

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    fueling infrastructure development New Report Describes Joint Opportunities for Natural Gas and Hydrogen Fuel-Cell Vehicle Markets On March 6, 2015, in Capabilities, Center for...

  15. Hydrogen Infrastructure Market Readiness: Opportunities and Potential...

    Broader source: Energy.gov (indexed) [DOE]

    methane reformer SOTA State-of-the-Art v Executive Summary Recent progress with fuel cell electric vehicles (FCEVs) has focused attention on hydrogen infrastructure as a...

  16. Voluntary Protection Program Onsite Review, Infrastructure Support...

    Office of Environmental Management (EM)

    2012 Voluntary Protection Program Onsite Review, Infrastructure Support Contract Paducah Gaseous Diffusion Plant - March 2012 March 2012 Evaluation to determine whether the...

  17. Natural Gas and Hydrogen Infrastructure Opportunities: Markets...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Opportunities: Markets and Barriers to Growth Natural Gas and Hydrogen Infrastructure Opportunities: Markets and Barriers to Growth Presentation by Matt Most, Encana Natural Gas,...

  18. Geographically-Based Infrastructure Analysis | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Infrastructure Analysis given by Keith Parks of the National Renewable Energy Laboratory during the DOE Hydrogen Transition Analysis Workshop on January 26,...

  19. International Hydrogen Infrastructure Challenges Workshop Summary...

    Broader source: Energy.gov (indexed) [DOE]

    presentation slides from the DOE Fuel Cell Technologies Office webinar "International Hydrogen Infrastructure Challenges Workshop Summary - NOW, NEDO, and DOE" held on December 16,...

  20. BLUE MOUNTAIN | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently20,000 RussianBy:WhetherNovember 13, 2009Oak Ridge National Laboratory (ORNL)ofBLUE

  1. Add Blue | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty Edit withTianlinPapersWindeySanta Clara, CaliforniaIAdamstown,Tennessee:Blue Place:

  2. Thermodynamics of Blue Phases In Electric Fields

    E-Print Network [OSTI]

    O. Henrich; D. Marenduzzo; K. Stratford; M. E. Cates

    2010-03-04T23:59:59.000Z

    We present extensive numerical studies to determine the phase diagrams of cubic and hexagonal blue phases in an electric field. We confirm the earlier prediction that hexagonal phases, both 2 and 3 dimensional, are stabilized by a field, but we significantly refine the phase boundaries, which were previously estimated by means of a semi-analytical approximation. In particular, our simulations show that the blue phase I -- blue phase II transition at fixed chirality is largely unaffected by electric field, as observed experimentally.

  3. 2012 BlueCross BlueShield of Tennessee. BlueCross BlueShield of Tennessee, Inc., an Independent Licensee of the BlueCross BlueShield Association.

    E-Print Network [OSTI]

    Hong, Don

    Licensee of the BlueCross BlueShield Association. Pricing and Health Care Reform Overview Heather Westman Director, Actuarial #12;2 Agenda Pricing Overview Health Care Reform Overview Major Provisions Insurance Market Reforms Exchange Medical Loss Ratio Requirements Rate Review Reform Impact Scenarios

  4. Blue Straggler Stars in Galactic Open Clusters and the effect of field star contamination

    E-Print Network [OSTI]

    G. Carraro; R. A. Vazquez; A. Moitinho

    2008-02-25T23:59:59.000Z

    We investigate the distribution of Blue Straggler stars in the field of three open star clusters. The main purpose is to highlight the crucial role played by general Galactic disk fore-/back-ground field stars, which are often located in the same region of the Color Magnitude Diagram as Blue Straggler stars. We analyze photometry taken from the literature of 3 open clusters of intermediate/old age rich in Blue Straggler stars, and which are projected in the direction of the Perseus arm, and study their spatial distribution and the Color Magnitude Diagram. As expected, we find that a large portion of the Blue Straggler population in these clusters are simply young field stars belonging to the spiral arm. This result has important consequences on the theories of the formation and statistics of Blue Straggler stars in different population environments: open clusters, globular clusters or dwarf galaxies. As previously emphasized by many authors, a detailed membership analysis is mandatory before comparing the Blue Straggler population in star clusters against theoretical models. Moreover, these sequences of young field stars (blue plumes) are potentially powerful tracers of Galactic structure which require further consideration.

  5. SelfSelf--healing Powerhealing Power Delivery InfrastructureDelivery Infrastructure

    E-Print Network [OSTI]

    Amin, S. Massoud

    Network/Systems Initiative Complex interactive networks: · Energy infrastructure: Electric power gridsSelfSelf--healing Powerhealing Power Delivery InfrastructureDelivery Infrastructure Massoud Amin, D developed while the author was at the Electric Power Research Institute (EPRI) in Palo Alto, CA. EPRI

  6. Sclerosing cellular blue nevus simulating melanoma

    E-Print Network [OSTI]

    Aydingoz, Ikbal Esen; Dikicioglu-Cetin, Emel

    2012-01-01T23:59:59.000Z

    in close association with slate gray pigmented dots inin close association with slate gray pigmented dots incollagenized fibrosis. The slate blue dots were regarded as

  7. Deep Blue No. 1-A Slimhole Geothermal Discovery at Blue Mountain...

    Open Energy Info (EERE)

    at Blue Mountain, Humboldt County, Nevada Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article: Deep Blue No. 1-A Slimhole Geothermal Discovery at...

  8. Deep Blue No.1-A Slimhole Geothermal Discovery At Blue Mountain...

    Open Energy Info (EERE)

    At Blue Mountain, Humboldt County, Nevada Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Paper: Deep Blue No.1-A Slimhole Geothermal Discovery At...

  9. A Sustainable approach to large ICT Science based infrastructures; the case for Radio Astronomy

    E-Print Network [OSTI]

    Barbosa, Domingos; Boonstra, Albert-Jan; Aguiar, Rui; van Ardenne, Arnold; de Santander-Vela, Juande; Verdes-Montenegro, Lourdes

    2014-01-01T23:59:59.000Z

    Large sensor-based infrastructures for radio astronomy will be among the most intensive data-driven projects in the world, facing very high power demands. The geographically wide distribution of these infrastructures and their associated processing High Performance Computing (HPC) facilities require Green Information and Communications Technologies (ICT). A combination is needed of low power computing, efficient data storage, local data services, Smart Grid power management, and inclusion of Renewable Energies. Here we outline the major characteristics and innovation approaches to address power efficiency and long-term power sustainability for radio astronomy projects, focusing on Green ICT for science.

  10. TECHNOLOGIES TO ENHANCE OPERATION OF THE EXISTING NATURAL GAS COMPRESSION INFRASTRUCTURE

    SciTech Connect (OSTI)

    Anthony J. Smalley; Ralph E. Harris; Gary D. Bourn

    2004-03-01T23:59:59.000Z

    This report documents work performed in Phase I of the project entitled: ''Technologies to Enhance Operation of the Existing Natural Gas Compression Infrastructure''. The project objective is to develop and substantiate methods for operating integral engine/compressors in gas pipeline service, which reduce fuel consumption, increase capacity, and enhance mechanical integrity. The report describes a number of potential enhancements to the existing natural gas compression infrastructure that have been identified and qualitatively demonstrated in tests on three different integral engine/compressors in natural gas transmission service.

  11. Infrastructure Development | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Process Projects are underway in this category. Check back for profiles to be posted soon. Informing the CodesStandards Process 2013 Top Innovations HPXML: A Standardized...

  12. Hydrogen Strategies: an Integrated Resource Planning Analysis for the Development of Hydrogen Energy Infrastructures

    E-Print Network [OSTI]

    Pigneri, Attilio

    2005-01-01T23:59:59.000Z

    analysis of hydrogen infrastructure development strategiesalso presented. Keywords: Hydrogen Infrastructure, Renewableof a Tasmanian hydrogen infrastructure is performed

  13. PEV Infrastructure Needs UC Davis Policy Institute

    E-Print Network [OSTI]

    California at Davis, University of

    ,000 sales in 2012, ramp up to 20,000/yr in 2013 2012 Honda Fit EV 2012 Tesla Model S Infrastructure needs1 PEV Infrastructure Needs UC Davis Policy Institute Policy Forum Series: ZEVs June 13, 2012 www into an increasingly clean, efficient, reliable, and safe electricity grid · PEVs advance energy security, air quality

  14. CLOUD COMPUTING INFRASTRUCTURE AND OPERATIONS PROGRAM

    E-Print Network [OSTI]

    Schaefer, Marcus

    theory and best practices, Cloud operations analytics, globally-responsive architecture, functional of Cloud infrastructures Best practices for building Infrastructure as a Service (IaaS), with an emphasis-distributed, responsive web application capable of massive scale with operational performance metrics. DePaul University

  15. A Product Software Knowledge Infrastructure for

    E-Print Network [OSTI]

    Utrecht, Universiteit

    1 A Product Software Knowledge Infrastructure for Situational Capability Maturation: Vision and Case Studies in Product Management Inge van de Weerd, Johan Versendaal and Sjaak Brinkkemper Department-3275 #12;2 A Product Software Knowledge Infrastructure for Situational Capability Maturation: Vision

  16. Site Support Program Plan Infrastructure Program

    SciTech Connect (OSTI)

    NONE

    1995-09-26T23:59:59.000Z

    The Fiscal Year 1996 Infrastructure Program Site Support Program Plan addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition. The Hanford Site`s infrastructure has served the Site for nearly 50 years during defense materials production. Now with the challenges of the new environmental cleanup mission, Hanford`s infrastructure must meet current and future mission needs in a constrained budget environment, while complying with more stringent environmental, safety, and health regulations. The infrastructure requires upgrading, streamlining, and enhancement in order to successfully support the site mission of cleaning up the Site, research and development, and economic transition.

  17. Advanced Electrical, Optical and Data Communication Infrastructure Development

    SciTech Connect (OSTI)

    Simon Cobb

    2011-04-30T23:59:59.000Z

    The implementation of electrical and IT infrastructure systems at the North Carolina Center for Automotive Research , Inc. (NCCAR) has achieved several key objectives in terms of system functionality, operational safety and potential for ongoing research and development. Key conclusions include: (1) The proven ability to operate a high speed wireless data network over a large 155 acre area; (2) Node to node wireless transfers from access points are possible at speeds of more than 50 mph while maintaining high volume bandwidth; (3) Triangulation of electronic devices/users is possible in areas with overlapping multiple access points, outdoor areas with reduced overlap of access point coverage considerably reduces triangulation accuracy; (4) Wireless networks can be adversely affected by tree foliage, pine needles are a particular challenge due to the needle length relative to the transmission frequency/wavelength; and (5) Future research will use the project video surveillance and wireless systems to further develop automated image tracking functionality for the benefit of advanced vehicle safety monitoring and autonomous vehicle control through 'vehicle-to-vehicle' and 'vehicle-to-infrastructure' communications. A specific advantage realized from this IT implementation at NCCAR is that NC State University is implementing a similar wireless network across Centennial Campus, Raleigh, NC in 2011 and has benefited from lessons learned during this project. Consequently, students, researchers and members of the public will be able to benefit from a large scale IT implementation with features and improvements derived from this NCCAR project.

  18. S E R I E S SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES

    E-Print Network [OSTI]

    S E R I E S SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES COMMISSION platform for distributed hybrid testing #12;SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN? Celestina Overview Implementation Validation Next steps #12;SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES

  19. S E R I E S SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES

    E-Print Network [OSTI]

    S E R I E S SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES COMMISSION Database: Architecture and implementation #12;SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN Conclusions #12;SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES 3 SERIES Concluding

  20. Rainwater in the Urban Landscape: The Garrison Creek Demonstration Project [Infrastructure as Landscape, Landscape as Infrastructure

    E-Print Network [OSTI]

    Brown, James; Storey, Kim

    1996-01-01T23:59:59.000Z

    ^7 ' g s PLACES BROWN AND ST O RE Y : G A RR I SO N CREEKspace. Toronto's Garrison Creek is a typical example of theits landscape. Today the creek flows through an elaborate,

  1. Blue Stragglers After the Main Sequence

    E-Print Network [OSTI]

    Alison Sills; Amanda Karakas; John Lattanzio

    2008-11-18T23:59:59.000Z

    We study the post-main sequence evolution of products of collisions between main sequence stars (blue stragglers), with particular interest paid to the horizontal branch and asymptotic giant branch phases. We found that the blue straggler progeny populate the colour-magnitude diagram slightly blueward of the red giant branch and between 0.2 and 1 magnitudes brighter than the horizontal branch. We also found that the lifetimes of collision products on the horizontal branch is consistent with the numbers of so-called "evolved blue straggler stars" (E-BSS) identified by various authors in a number of globular clusters, and is almost independent of mass or initial composition profile. The observed ratio of the number of E-BSS to blue stragglers points to a main sequence lifetime for blue stragglers of approximately 1-2 Gyr on average.

  2. Flexoelectric switching in cholesteric blue phases

    E-Print Network [OSTI]

    A. Tiribocchi; M. E. Cates; G. Gonnella; D. Marenduzzo; E. Orlandini

    2013-03-25T23:59:59.000Z

    We present computer simulations of the response of a flexoelectric blue phase network, either in bulk or under confinement, to an applied field. We find a transition in the bulk between the blue phase I disclination network and a parallel array of disclinations along the direction of the applied field. Upon switching off the field, the system is unable to reconstruct the original blue phase but gets stuck in a metastable phase. Blue phase II is comparatively much less affected by the field. In confined samples, the anchoring at the walls and the geometry of the device lead to the stabilisation of further structures, including field-aligned disclination loops, splayed nematic patterns, and yet more metastable states. Our results are relevant to the understanding of the switching dynamics for a class of new, "superstable", blue phases which are composed of bimesogenic liquid crystals, as these materials combine anomalously large flexoelectric coefficients, and low or near-zero dielectric anisotropy.

  3. Blue and fin whale acoustics and ecology off Antarctic Peninsula

    E-Print Network [OSTI]

    Sirovic, Ana

    2006-01-01T23:59:59.000Z

    for increases in Antarctic blue whales based on BayesianG. , 1962b. The movements of blue and fin whales within theF. G. Wheeler, 1929. Southern blue and fin whales. Discovery

  4. Blue oak seedling age influences growth and mortality

    E-Print Network [OSTI]

    Phillips, Ralph L.; McDougald, Neil K.; McCreary, Doug D.; Atwill, Edward R.

    2007-01-01T23:59:59.000Z

    1997b. Stand- level status of blue oak sapling recruitment1991. Soil water effects on blue oak seedling establishment.NK, Standiford RB, Frost WE. 1996. Blue oak seedlings may be

  5. The truth about 'The truth about true blue'

    E-Print Network [OSTI]

    Cohen, Jonathan; Hardin, C. L.; McLaughlin, Brian P.

    2007-01-01T23:59:59.000Z

    2168. Tye, M. (2006a). True blue. Analysis, 66. Tye, M. (2006b). The truth about true blue. Analysis, 66(4).D. R. (2006). Truest blue. Analysis, 66. Cohen, J. , Hardin,

  6. Exclosure size affects young blue oak seedling growth

    E-Print Network [OSTI]

    Phillips, Ralph L.; McDougald, Neil K.; Atwill, Edward R.; McCreary, Doug

    2007-01-01T23:59:59.000Z

    in?uences rodent damage to blue oaks. Oaks ’N Folks tat.Exclosure size affects young blue oak seedling growth byR. Atwill and Doug McCreary Blue oak, a tree native only to

  7. A Longitudinal Study of Wrist Tendinosis in Blue Collar Workers

    E-Print Network [OSTI]

    Harris Adamson, Carisa

    2010-01-01T23:59:59.000Z

    Study of Wrist Tendinosis in Blue Collar Workers. by CarisaStudy of Wrist Tendinosis in Blue Collar Workers by Carisawrist tendinosis among blue—collar workers, and includes a

  8. Informationen zur Ausschreibung des Studienreformprojekts ,,Blue Engineering Seminar"

    E-Print Network [OSTI]

    Berlin,Technische Universität

    Informationen zur Ausschreibung des Studienreformprojekts ,,Blue Engineering Seminar" angesiedelt am Fachgebiet Konstruktion von Maschinensystemen Die Idee von Blue Engineering ist es, soziale und Ingenieurberufs, Greenwashing oder Energiespeicherung. Das Blue Engineering Seminar wurde während der letzten drei

  9. With BlueCard Worldwide you can explore the world with peace of mind. Like your passport, always carry your Blue Cross and Blue Shield of Oklahoma

    E-Print Network [OSTI]

    Oklahoma, University of

    With BlueCard Worldwide you can explore the world with peace of mind. Like your passport, always carry your Blue Cross and Blue Shield of Oklahoma (BCBSOK) identification (ID) card with you when you travel or live abroad. Through the BlueCard Worldwide program, you have access to medical assistance

  10. Growth of the NGV Market: Lessons Learned Roadmap for Infrastructure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Growth of the NGV Market: Lessons Learned Roadmap for Infrastructure Development Growth of the NGV Market: Lessons Learned Roadmap for Infrastructure Development Presented at...

  11. April 7 Webinar on OE's Resilient Electricity Delivery Infrastructure...

    Energy Savers [EERE]

    April 7 Webinar on OE's Resilient Electricity Delivery Infrastructure Initiative FOA April 7 Webinar on OE's Resilient Electricity Delivery Infrastructure Initiative FOA March 23,...

  12. H2A Hydrogen Delivery Infrastructure Analysis Models and Conventional...

    Energy Savers [EERE]

    H2A Hydrogen Delivery Infrastructure Analysis Models and Conventional Pathway Options Analysis Results - Interim Report H2A Hydrogen Delivery Infrastructure Analysis Models and...

  13. Challenge # 2 Logistics and Compatibility with Existing Infrastructure...

    Office of Environmental Management (EM)

    2 Logistics and Compatibility with Existing Infrastructure Throughout Supply Chain Challenge 2 Logistics and Compatibility with Existing Infrastructure Throughout Supply Chain...

  14. Publication of "Year in Review 2010: Energy Infrastructure Events...

    Energy Savers [EERE]

    Publication of "Year in Review 2010: Energy Infrastructure Events and Expansions" Publication of "Year in Review 2010: Energy Infrastructure Events and Expansions" August 31, 2011...

  15. Energy Infrastructure Events and Expansions Year-in-Review 2011...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Infrastructure Events and Expansions Year-in-Review 2011 Available (April 2012) Energy Infrastructure Events and Expansions Year-in-Review 2011 Available (April 2012) May 1, 2012 -...

  16. Year-in-Review: 2014 Energy Infrastructure Events and Expansions...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Year-in-Review: 2014 Energy Infrastructure Events and Expansions Report Now Available (May 2015) Year-in-Review: 2014 Energy Infrastructure Events and Expansions Report Now...

  17. Year-in-Review: 2013 Energy Infrastructure Events and Expansions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Energy Infrastructure Events and Expansions Now Available (May 2014) Year-in-Review: 2013 Energy Infrastructure Events and Expansions Now Available (May 2014) May 12, 2014 -...

  18. Year-in-Review: 2012 Energy Infrastructure Events and Expansions...

    Energy Savers [EERE]

    2 Energy Infrastructure Events and Expansions Now Available (July 2013) Year-in-Review: 2012 Energy Infrastructure Events and Expansions Now Available (July 2013) July 26, 2013 -...

  19. Implementing a Hydrogen Energy Infrastructure: Storage Options and System Design

    E-Print Network [OSTI]

    Ogden, Joan M; Yang, Christopher

    2005-01-01T23:59:59.000Z

    to International Journal of Hydrogen Energy (November 2005).05—28 Implementing a Hydrogen Energy Infrastructure: StorageImplementing a Hydrogen Energy Infrastructure: Storage

  20. Green Infrastructure and Flood Resiliency-Land Use Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Infrastructure and Flood Resiliency-Land Use Management as an Adaptation Strategy in the Built Environment Green Infrastructure and Flood Resiliency-Land Use Management as an...

  1. taking charge : optimizing urban charging infrastructure for shared electric vehicles

    E-Print Network [OSTI]

    Subramani, Praveen

    2012-01-01T23:59:59.000Z

    This thesis analyses the opportunities and constraints of deploying charging infrastructure for shared electric vehicles in urban environments. Existing electric vehicle charging infrastructure for privately owned vehicles ...

  2. FY 2003 Progress Report for Hydrogen, Fuel Cells and Infrastructure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FY 2003 Progress Report for Hydrogen, Fuel Cells and Infrastructure Technologies Program FY 2003 Progress Report for Hydrogen, Fuel Cells and Infrastructure Technologies Program...

  3. Analysis of a Cluster Strategy for Near Term Hydrogen Infrastructure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    a Cluster Strategy for Near Term Hydrogen Infrastructure Rollout in Southern California Analysis of a Cluster Strategy for Near Term Hydrogen Infrastructure Rollout in Southern...

  4. Short Paper: PEPSI: Privacy-Enhanced Participatory Sensing Infrastructure

    E-Print Network [OSTI]

    Politécnica de Madrid, Universidad

    Short Paper: PEPSI: Privacy-Enhanced Participatory Sensing Infrastructure Emiliano De Cristofaro-secure guarantees. In this paper, we introduce PEPSI: Privacy- Enhanced Participatory Sensing Infrastructure. We

  5. Fuel Cell Electric Vehicles and Hydrogen Infrastructure: Deployment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fuel Cell Electric Vehicles and Hydrogen Infrastructure: Deployment and Issues Fuel Cell Electric Vehicles and Hydrogen Infrastructure: Deployment and Issues This presentation by...

  6. EPA Webcast - Creating a Green Infrastructure Plan to Transform...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Webcast - Creating a Green Infrastructure Plan to Transform Your Community EPA Webcast - Creating a Green Infrastructure Plan to Transform Your Community November 18, 2014...

  7. Webinar: Creating a Green Infrastructure Plan to Transform Your...

    Broader source: Energy.gov (indexed) [DOE]

    Webinar: Creating a Green Infrastructure Plan to Transform Your Community Webinar: Creating a Green Infrastructure Plan to Transform Your Community November 18, 2014 3:00PM to...

  8. Evalutation of Natural Gas Pipeline Materials and Infrastructure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Evalutation of Natural Gas Pipeline Materials and Infrastructure for HydrogenMixed Gas Service Evalutation of Natural Gas Pipeline Materials and Infrastructure for HydrogenMixed...

  9. Natural Gas Infrastructure R&D and Methane Emissions Mitigation...

    Energy Savers [EERE]

    Natural Gas Infrastructure R&D and Methane Emissions Mitigation Workshop Natural Gas Infrastructure R&D and Methane Emissions Mitigation Workshop The Advanced Manufacturing Office...

  10. Midstream Infrastructure Improvements Key to Realizing Full Potential...

    Office of Environmental Management (EM)

    Midstream Infrastructure Improvements Key to Realizing Full Potential of Domestic Natural Gas Midstream Infrastructure Improvements Key to Realizing Full Potential of Domestic...

  11. DOE Announces Webinars on Compressed Natural Gas Infrastructure...

    Energy Savers [EERE]

    Compressed Natural Gas Infrastructure, an Advanced Rooftop Unit Campaign, and More DOE Announces Webinars on Compressed Natural Gas Infrastructure, an Advanced Rooftop Unit...

  12. HyDIVE (Hydrogen Dynamic Infrastructure and Vehicle Evolution...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    HyDIVE (Hydrogen Dynamic Infrastructure and Vehicle Evolution) Model Analysis HyDIVE (Hydrogen Dynamic Infrastructure and Vehicle Evolution) Model Analysis Presentation by NREL's...

  13. Hydrogen Vehicle and Infrastructure Codes and Standards Citations...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vehicle and Infrastructure Codes and Standards Citations Hydrogen Vehicle and Infrastructure Codes and Standards Citations This document lists codes and standards typically used...

  14. Improving Risk Assessment to Support State Energy Infrastructure...

    Energy Savers [EERE]

    Improving Risk Assessment to Support State Energy Infrastructure Decision Making Improving Risk Assessment to Support State Energy Infrastructure Decision Making May 22, 2015 -...

  15. Recognition and interpretation of meetings: The AMI and AMIDA projects 

    E-Print Network [OSTI]

    Renals, Steve; Hain, Thomas; Bourlard, Herve

    2007-01-01T23:59:59.000Z

    The AMI and AMIDA projects are concerned with the recognition and interpretation of multiparty meetings. Within these projects we have: developed an infrastructure for recording meetings using multiple microphones and ...

  16. Transforming the U.S. Energy Infrastructure

    SciTech Connect (OSTI)

    Larry Demick

    2010-07-01T23:59:59.000Z

    The U.S. energy infrastructure is among the most reliable, accessible and economic in the world. On the other hand, the U.S. energy infrastructure is excessively reliant on foreign sources of energy, experiences high volatility in energy prices, does not practice good stewardship of finite indigenous energy resources and emits significant quantities of greenhouse gases (GHG). This report presents a Technology Based Strategy to achieve a full transformation of the U.S. energy infrastructure that corrects these negative factors while retaining the positives.

  17. Infrastructure for distributed enterprise simulation

    SciTech Connect (OSTI)

    Johnson, M.M.; Yoshimura, A.S.; Goldsby, M.E. [and others

    1998-01-01T23:59:59.000Z

    Traditional discrete-event simulations employ an inherently sequential algorithm and are run on a single computer. However, the demands of many real-world problems exceed the capabilities of sequential simulation systems. Often the capacity of a computer`s primary memory limits the size of the models that can be handled, and in some cases parallel execution on multiple processors could significantly reduce the simulation time. This paper describes the development of an Infrastructure for Distributed Enterprise Simulation (IDES) - a large-scale portable parallel simulation framework developed to support Sandia National Laboratories` mission in stockpile stewardship. IDES is based on the Breathing-Time-Buckets synchronization protocol, and maps a message-based model of distributed computing onto an object-oriented programming model. IDES is portable across heterogeneous computing architectures, including single-processor systems, networks of workstations and multi-processor computers with shared or distributed memory. The system provides a simple and sufficient application programming interface that can be used by scientists to quickly model large-scale, complex enterprise systems. In the background and without involving the user, IDES is capable of making dynamic use of idle processing power available throughout the enterprise network. 16 refs., 14 figs.

  18. Emission Zone Control in Blue Organic Electrophosphorescent Devices...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Zone Control in Blue Organic Electrophosphorescent Devices Through Chemical Modification of Host Materials . Emission Zone Control in Blue Organic Electrophosphorescent Devices...

  19. Highly efficient blue organic light emitting devices with indium...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    efficient blue organic light emitting devices with indium-free transparent anode on flexible substrates. Highly efficient blue organic light emitting devices with indium-free...

  20. High-efficiency turquoise-blue electrophosphorescence from a...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    efficiency turquoise-blue electrophosphorescence from a Pt(II)-pyridyltriazolate complex in phosphine oxide host. High-efficiency turquoise-blue electrophosphorescence from a...

  1. High efficiency and low roll-off blue phosphorescent organic...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    efficiency and low roll-off blue phosphorescent organic light-emitting devices using mixed host architecture. High efficiency and low roll-off blue phosphorescent organic...

  2. Sensitivity of the Properties of Ruthenium Blue Dimer”...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sensitivity of the Properties of Ruthenium Blue Dimer” to Method, Basis Set, and Continuum Model. Sensitivity of the Properties of Ruthenium Blue Dimer” to Method,...

  3. Phosphine oxide derivatives as hosts for blue phosphors: A joint...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    oxide derivatives as hosts for blue phosphors: A joint theoretical and experimental study of their electronic Phosphine oxide derivatives as hosts for blue phosphors: A joint...

  4. Thermal Gradient Holes At Blue Mountain Geothermal Area (Fairbank...

    Open Energy Info (EERE)

    Blue Mountain Geothermal Area (Fairbank & Niggemann, 2004) Exploration Activity Details Location Blue Mountain Geothermal Area Exploration Technique Thermal Gradient Holes Activity...

  5. Direct-Current Resistivity Survey At Blue Mountain Area (Fairbank...

    Open Energy Info (EERE)

    Blue Mountain Area (Fairbank Engineering Ltd, 2005) Exploration Activity Details Location Blue Mountain Area Exploration Technique Direct-Current Resistivity Survey Activity Date...

  6. Slim Holes At Blue Mountain Geothermal Area (Fairbank Engineering...

    Open Energy Info (EERE)

    Home Exploration Activity: Slim Holes At Blue Mountain Geothermal Area (Fairbank Engineering Ltd, 2003) Exploration Activity Details Location Blue Mountain Geothermal Area...

  7. Aerial Photography At Blue Mountain Geothermal Area (Fairbank...

    Open Energy Info (EERE)

    Exploration Activity: Aerial Photography At Blue Mountain Geothermal Area (Fairbank Engineering Ltd, 2003) Exploration Activity Details Location Blue Mountain Geothermal Area...

  8. National Computational Infrastructure for Lattice Gauge Theory SciDAC-2 Closeout Report Indiana University Component

    SciTech Connect (OSTI)

    Gottlieb, Steven Arthur [Indiana University; DeTar, Carleton [University of Utah; Tousaint, Doug [University of Arizona

    2014-07-24T23:59:59.000Z

    This is the closeout report for the Indiana University portion of the National Computational Infrastructure for Lattice Gauge Theory project supported by the United States Department of Energy under the SciDAC program. It includes information about activities at Indian University, the University of Arizona, and the University of Utah, as those three universities coordinated their activities.

  9. Page 1 of 2 PON-11-609 Special Terms and Conditions Hydrogen Fuel Infrastructure

    E-Print Network [OSTI]

    Page 1 of 2 PON-11-609 Special Terms and Conditions Hydrogen Fuel Infrastructure ATTACHMENT N the Commission for the 5% of the total project cost. 2. 33% Renewable Hydrogen Performance Incentive Recipient elected in its proposal to dispense renewable hydrogen at

  10. Low-Cost, Robust, Threat-aware Wireless Sensor Network for Assuring the Nation's Energy Infrastructure

    SciTech Connect (OSTI)

    Carlos H. Rentel

    2007-03-31T23:59:59.000Z

    The objective of this project was to create a low-cost, robust anticipatory wireless sensor network (A-WSN) to ensure the security and reliability of the United States energy infrastructure. This document highlights Eaton Corporation's plan to bring these technologies to market.

  11. Blue Sky Bio Fuels | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia: EnergyAvignon,Belcher HomesLyonsBirchBlockVI JumpBlueBlueBlue Sky

  12. Blue Sphere Corp | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia: EnergyAvignon,Belcher HomesLyonsBirchBlockVI JumpBlueBlueBlue

  13. 2nd International Hydrogen Infrastructure Challenges Webinar

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    issues facing hydrogen infrastructure fuel cell electric vehicles in the U.S. Europe, Germany, Scandinavia, and Japan. o H2 Fueling o H2 Quality o H2 metering o H2 Station...

  14. Public private partnership in infrastructure financing

    E-Print Network [OSTI]

    Ahmed, Anas

    2014-01-01T23:59:59.000Z

    The global financial crisis, which was unique in its magnitude and after effects, has generated significant interest in Public Private Partnership (PPP). Lack of investments and deteriorated infrastructure challenges ...

  15. Natural Gas and Hydrogen Infrastructure Opportunities: Markets...

    Broader source: Energy.gov (indexed) [DOE]

    h presentation slides: Natural Gas and hydrogen Infrastructure opportunities: markets and Barriers to Growth Matt Most, Encana Natural Gas 1 OctOber 2011 | ArgOnne nAtiOnAl...

  16. Wireless Sensor Network Infrastructure : Construction and Evaluation

    E-Print Network [OSTI]

    Boyer, Edmond

    Wireless Sensor Network Infrastructure : Construction and Evaluation Kamal Beydoun, Violeta Felea main features for efficient energy management in wireless sensor networks. This paper aims to present a distributed and low-cost topology construction algorithm for wireless sensor networks, addressing

  17. Delaware Transportation Infrastructure Forum Problem Identification Statements

    E-Print Network [OSTI]

    Firestone, Jeremy

    2013 Delaware Transportation Infrastructure Forum Problem Identification Statements Sponsored by The Delaware Center for Transportation and the Delaware Department of Transportation Delaware Center for Transportation Your main resource for transportation education and research Identifying Important Issues Related

  18. Costs Associated With Propane Vehicle Fueling Infrastructure

    SciTech Connect (OSTI)

    Smith, M.; Gonzales, J.

    2014-08-01T23:59:59.000Z

    This document is designed to help fleets understand the cost factors associated with propane vehicle fueling infrastructure. It provides an overview of the equipment and processes necessary to develop a propane fueling station and offers estimated cost ranges.

  19. Obtaining Disaster Assistance for Public Infrastructure

    E-Print Network [OSTI]

    Taylor, Greg

    2005-10-10T23:59:59.000Z

    County and municipal governments, as well as certain private non-profit organizations, may qualify for assistance in rebuilding public infrastructure after a natural disaster. This leaflet details the assistance programs available from the Federal...

  20. Strategic Plan for the Computational Infrastructure

    E-Print Network [OSTI]

    Sugar, Robert

    Strategic Plan for the Computational Infrastructure for Lattice Gauge Theory Lattice QCD Executive is a defining problem for hadron physics just as the hydrogen atom is for atomic physics. Indeed, the DOE

  1. Social network support for data delivery infrastructures

    E-Print Network [OSTI]

    Sastry, Nishanth Ramakrishna

    2011-10-11T23:59:59.000Z

    in social networks can be used to tailor content staging decisions to the user base and thereby build better data delivery infrastructures. This claim is supported by two case studies, which apply social information in challenging situations where...

  2. Hydrogen Infrastructure Market Readiness Workshop Agenda

    Broader source: Energy.gov (indexed) [DOE]

    NRELDOE Hydrogen Infrastructure Market Readiness Workshop Agenda Page 1 of 2 NRELDOE Workshop at the Gaylord National, Washington D.C., February 16-17, 2011 Transitioning to an...

  3. ESTIMATING RISK TO CALIFORNIA ENERGY INFRASTRUCTURE FROM PROJECTED CLIMATE CHANGE

    E-Print Network [OSTI]

    Sathaye, Jayant

    2011-01-01T23:59:59.000Z

    installed at California power plants. Furthermore, recentlyinformation for California’s power plants. Personalinformation for California’s power plants. Personal

  4. ESTIMATING RISK TO CALIFORNIA ENERGY INFRASTRUCTURE FROM PROJECTED CLIMATE CHANGE

    E-Print Network [OSTI]

    Sathaye, Jayant

    2011-01-01T23:59:59.000Z

    loss to natural gas-fired simple-cycle combustion turbine (of natural gas power plants: (1) simple-cycle combustionnatural gas power plants are considered: simple- cycle combustion

  5. ESTIMATING RISK TO CALIFORNIA ENERGY INFRASTRUCTURE FROM PROJECTED CLIMATE CHANGE

    E-Print Network [OSTI]

    Sathaye, Jayant

    2011-01-01T23:59:59.000Z

    1997. “Climate Change and Water Resources. ” Climatic Change2006. Cost and Value of Water Use at Combined-Cycle Power2006. Cost and Value of Water Use at Combined-Cycle Power

  6. Microsoft Word - 2014_Infrastructure Field Projects - Table.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reservoirs in the Central Appalachian Basin Virginia Polytechnic Institute VA09 Sequestration of Carbon Dioxide Gas in Coal Seams CONSOL Energy Inc. PA18 Small Scale...

  7. ESTIMATING RISK TO CALIFORNIA ENERGY INFRASTRUCTURE FROM PROJECTED CLIMATE CHANGE

    E-Print Network [OSTI]

    Sathaye, Jayant

    2011-01-01T23:59:59.000Z

    and distribution lines, and gas storage facilities and pipelines.and distribution system, and oil/natural gas pipelines.and distribution system, and oil/natural gas pipelines. This

  8. ESTIMATING RISK TO CALIFORNIA ENERGY INFRASTRUCTURE FROM PROJECTED CLIMATE CHANGE

    E-Print Network [OSTI]

    Sathaye, Jayant

    2011-01-01T23:59:59.000Z

    in natural gas power plant generating capacity of 3 to 6cycle natural gas power plant generating capacity between 3coastal power plants with a combined generating capacity of

  9. ESTIMATING RISK TO CALIFORNIA ENERGY INFRASTRUCTURE FROM PROJECTED CLIMATE CHANGE

    E-Print Network [OSTI]

    Sathaye, Jayant

    2011-01-01T23:59:59.000Z

    that use wet-cooling technologies in the future, especiallyair- based cooling technologies in the future (see Table 1).per time period Future type of cooling equipment installed

  10. ESTIMATING RISK TO CALIFORNIA ENERGY INFRASTRUCTURE FROM PROJECTED CLIMATE CHANGE

    E-Print Network [OSTI]

    Sathaye, Jayant

    2011-01-01T23:59:59.000Z

    California Energy Commission definition of “heat storm”: “storm“ than the Energy Commission definition quoted above toCalifornia Energy Commission. 2008. Definition of Heat

  11. ESTIMATING RISK TO CALIFORNIA ENERGY INFRASTRUCTURE FROM PROJECTED CLIMATE CHANGE

    E-Print Network [OSTI]

    Sathaye, Jayant

    2011-01-01T23:59:59.000Z

    2005. Potential Changes in Hydropower Production from Globalon high elevation hydropower generation in California'ssources include imports (hydropower from the north, thermal

  12. EV Project Electric Vehicle Charging Infrastructure Summary Report

    Broader source: Energy.gov (indexed) [DOE]

    days 2013 ECOtality 7302013 8:20:32 AM INLMIS-10-19479 4 of 116 Vehicles Charged Car sharing fleet Nissan Leaf Chevrolet Volt Unknown Percent of charging events 53% 6%...

  13. EV Project Electric Vehicle Charging Infrastructure Summary Report

    Broader source: Energy.gov (indexed) [DOE]

    all days 2012 ECOtality 212013 9:44:51 AM INLMIS-10-19479 4 of 89 Vehicles Charged Car sharing fleet Nissan Leaf Chevrolet Volt Unknown Percent of charging events 22% 20%...

  14. ESTIMATING RISK TO CALIFORNIA ENERGY INFRASTRUCTURE FROM PROJECTED CLIMATE CHANGE

    E-Print Network [OSTI]

    Sathaye, Jayant

    2011-01-01T23:59:59.000Z

    Communication. IPCC (Intergovernmental Panel on Climate Change).climate change are planned, but not yet under way (Knowles, personal communication.Communication. Greg Fishman and Dave Hawlkins. California Climate Change

  15. ESTIMATING RISK TO CALIFORNIA ENERGY INFRASTRUCTURE FROM PROJECTED CLIMATE CHANGE

    E-Print Network [OSTI]

    Sathaye, Jayant

    2011-01-01T23:59:59.000Z

    Gary Fitts, Peter Larsen, Kevin Koy, Sarah Lewis, and AndreLarsen, Gary Fitts, Lawrence Berkeley National Laboratory (LBNL) Kevin Koy and Sarah Lewis,

  16. Charging Infrastructure for Electric Vehicles (Smart Grid Project) | Open

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual Model, click here.Telluric Survey asWest,CEI JumpChandradeepForms | OpenUsingEnergy

  17. SLT Power Infrastructure Projects Pvt Ltd | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro Industries Pvt Ltd Jump to:RoscommonSBY Solutions Jump to:

  18. US Recovery Act Smart Grid Projects - Advanced Metering Infrastructure |

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown of Ladoga, IndianaTurtle Airships JumpTypefor Africa |Green6NFCRCOpen Energy

  19. TECHNOLOGIES TO ENHANCE OPERATION OF THE EXISTING NATURAL GAS COMPRESSION INFRASTRUCTURE

    SciTech Connect (OSTI)

    Anthony J. Smalley; Ralph E. Harris; Gary D. Bourn

    2003-10-01T23:59:59.000Z

    This report documents work performed in the fourth quarter of the project entitled: ''Technologies to Enhance Operation of the Existing Natural Gas Compression Infrastructure''. The project objective is to develop and substantiate methods for operating integral engine/compressors in gas pipeline service, which reduce fuel consumption, increase capacity, and enhance mechanical integrity. The report describes the following work: second field test; test data analysis for the first field test; operational optimization plans.

  20. TECHNOLOGIES TO ENHANCE OPERATION OF THE EXISTNG NATURAL GAS COMPRESSION INFRASTRUCTURE

    SciTech Connect (OSTI)

    Anthony J. Smalle; Ralph E. Harris; Gary D. Bourn

    2003-07-01T23:59:59.000Z

    This report documents work performed in the third quarter of the project entitled: ''Technologies to Enhance Operation of the Existing Natural Gas Compression Infrastructure''. The project objective is to develop and substantiate methods for operating integral engine/compressors in gas pipeline service, which reduce fuel consumption, increase capacity, and enhance mechanical integrity. The report describes the following work: first field test; test data analysis.

  1. AVTA: ChargePoint America Recovery Act Charging Infrastructure Reports

    Broader source: Energy.gov [DOE]

    The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The American Recovery and Reinvestment Act supported a number of projects that together made up the largest ever deployment of plug-in electric vehicles and charging infrastructure in the U.S. The following reports describe results of data collected through the Chargepoint America project, which deployed 4,600 public and home charging stations throughout the U.S. This research was conducted by Idaho National Laboratory.

  2. TECHNOLOGIES TO ENHANCE OPERATION OF THE EXISTING NATURAL GAS COMPRESSION INFRASTRUCTURE

    SciTech Connect (OSTI)

    Anthony J. Smalley; Ralph E. Harris

    2003-01-01T23:59:59.000Z

    This report documents work performed in the first quarter of the project entitled: ''Technologies to Enhance Operation of the Existing Natural Gas Compression Infrastructure''. The project objective is to develop and substantiate methods for operating integral engine/compressors in gas pipeline service, which reduce fuel consumption, increase capacity, and enhance mechanical integrity. The report describes the following work: preparation and submission of the Research Management Plan; preparation and submission of the Technology Status Assessment; attendance at the Project Kick-Off meeting at DOE-NETL; formation of the Industry Advisory Committee (IAC) for the project; preparation of the Test Plan; acquisition and assembly of the data acquisition system (DAS).

  3. EA-0939: Blue Creek Winter Range: Wildlife Mitigation Project, Washington

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the proposal for the U.S. Department of Energy's Bonneville Power Administration to secure land and conduct wildlife habitat enhancement and long term...

  4. EA-1746: Blue Mountain Geothermal Development Project, Humboldt & Pershing

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China U.S.ContaminationJuly 2011D APPENDIXKahuku Wind Power,Thermal EnergyAirCounty, NV |

  5. Blue Peter Project Group Inc | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:EzfeedflagBiomass ConversionsSouthby 2022 |BleckleyMotion Energy Jump to:Ng Jump to:Oak

  6. Blue Ribbon Commission Tour of Hanford Site

    SciTech Connect (OSTI)

    Paul Saueressig

    2010-07-14T23:59:59.000Z

    The Blue Ribbon Commission on America's Nuclear Future toured the Department of Energy's Hanford Site on July 14, 2010. Commission members, invited guests, and members of the public visited facilities that store high-level, radioactive waste.

  7. Elementary Theorems Regarding Blue Isocurvature Perturbations

    E-Print Network [OSTI]

    Daniel J. H. Chung; Hojin Yoo

    2015-01-23T23:59:59.000Z

    Blue CDM-photon isocurvature perturbations are attractive in terms of observability and may be typical from the perspective of generic mass relations in supergravity. We present and apply three theorems useful for blue isocurvature perturbations arising from linear spectator scalar fields. In the process, we give a more precise formula for the blue spectrum associated with the axion model of 0904.3800, which can in a parametric corner give a factor of O(10) correction. We explain how a conserved current associated with Peccei-Quinn symmetry plays a crucial role and explicitly plot several example spectra including the breaks in the spectra. We also resolve a little puzzle arising from a naive multiplication of isocurvature expression that sheds light on the gravitational imprint of the adiabatic perturbations on the fields responsible for blue isocurvature fluctuations.

  8. A Clock Reaction Based on Molybdenum Blue

    E-Print Network [OSTI]

    Neuenschwander, Ulrich

    Clock reactions are rare kinetic phenomena, so far limited mostly to systems with ionic oxoacids and oxoanions in water. We report a new clock reaction in cyclohexanol that forms molybdenum blue from a noncharged, yellow ...

  9. Elementary Theorems Regarding Blue Isocurvature Perturbations

    E-Print Network [OSTI]

    Chung, Daniel J H

    2015-01-01T23:59:59.000Z

    Blue CDM-photon isocurvature perturbations are attractive in terms of observability and may be typical from the perspective of generic mass relations in supergravity. We present and apply three theorems useful for blue isocurvature perturbations arising from linear spectator scalar fields. In the process, we give a more precise formula for the blue spectrum associated with the work of 0904.3800, which can in a parametric corner give a factor of O(10) correction. We explain how a conserved current associated with Peccei-Quinn symmetry plays a crucial role and explicitly plot several example spectra including the breaks in the spectra. We also resolve a little puzzle arising from a naive multiplication of isocurvature expression that sheds light on the gravitational imprint of the adiabatic perturbations on the fields responsible for blue isocurvature fluctuations.

  10. Heparin sensing: Blue-chip binding

    E-Print Network [OSTI]

    Shriver, Zachary H.

    Heparin is an anionic polysaccharide that has tremendous clinical importance as an anticoagulant. Several dyes have been developed that can detect heparin, and the latest example — named Mallard Blue — has now been shown ...

  11. Blue Ribbon Commission Tour of Hanford Site

    ScienceCinema (OSTI)

    Paul Saueressig

    2010-09-01T23:59:59.000Z

    The Blue Ribbon Commission on America's Nuclear Future toured the Department of Energy's Hanford Site on July 14, 2010. Commission members, invited guests, and members of the public visited facilities that store high-level, radioactive waste.

  12. The California Economy: Singing the Housing Blues

    E-Print Network [OSTI]

    Thornberg, Christopher

    2007-01-01T23:59:59.000Z

    THE CALIFORNIA ECONOMY: SINGING THE HOUSING  BLUES Many  parts  of  the  economy  are  doing  better  than towards 2007 the entire economy is being threatened by the 

  13. Geothermal Technologies Program Blue Ribbon Panel Recommendations

    Broader source: Energy.gov [DOE]

    This report describes the recommendations of the Geothermal Blue Ribbon Panel, a panel of geothermal experts assembled in March 2011 for a discussion on the future of geothermal energy in the U.S.

  14. Cryptographic Hash Function BLUE MIDNIGHT WISH

    E-Print Network [OSTI]

    Kaminsky, Alan

    224 and BMW256 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 BWM384 and BMW512224 and BMW256 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 BWM384 and BMW512 for all variants of the BLUE MIDNIGHT WISH . . . . . . . . . . . 15 2.1.1 BMW224 and BMW256

  15. The scientific case for eInfrastructure in Norway

    E-Print Network [OSTI]

    Helgaker, Trygve

    The scientific case for eInfrastructure in Norway The eInfrastructure Scientific Opportunities Panel #12;2 3 The scientific case for eInfrastructure in Norway The eInfrastructure Scientific Opportunities Panel Appointed by the Research Council of Norway Galen Gisler (chair) Physics of Geological

  16. INNOVATIONS IN NUCLEAR INFRASTRUCTURE AND EDUCATION (INIE) CONSORTIA - CURRENT STATUS

    SciTech Connect (OSTI)

    Fjeld, R.A.; Gutteridge, J.; Williamson, C.

    2004-10-06T23:59:59.000Z

    This presentation discusses the current status of innovations in the Nuclear Infrastructure and Education (INIE) Consortia.

  17. SERIES workshopSERIES workshop Role of research infrastructures in seismic rehabilitationRole of research infrastructures in seismic rehabilitationRole of research infrastructures in seismic rehabilitationRole of research infrastructures in seismic rehabi

    E-Print Network [OSTI]

    SERIES workshopSERIES workshop Role of research infrastructures in seismic rehabilitationRole of research infrastructures in seismic rehabilitationRole of research infrastructures in seismic rehabilitationRole of research infrastructures in seismic rehabilitation Istanbul, 8Istanbul, 8--9 February 20129

  18. Axion isocurvature fluctuations with extremely blue spectrum

    SciTech Connect (OSTI)

    Kasuya, Shinta [Department of Information Science, Kanagawa University, Kanagawa 259-1293 (Japan); Kawasaki, Masahiro [Institute for Cosmic Ray Research, University of Tokyo, Chiba 277-8582 (Japan); Institute for the Physics and Mathematics of the Universe, University of Tokyo, Chiba 277-8582 (Japan)

    2009-07-15T23:59:59.000Z

    We construct an axion model for generating isocurvature fluctuations with blue spectrum, n{sub iso}=2-4, which is suggested by recent analyses of admixture of adiabatic and isocurvature perturbations with independent spectral indices, n{sub ad}{ne}n{sub iso}. The distinctive feature of the model is that the spectrum is blue at large scales while scale invariant at small scales. This is naturally realized by the dynamics of the Peccei-Quinn scalar field.

  19. Project no.: IST-FP6-STREP -027513 Project full title: Critical Utility InfrastructurAL Resilience

    E-Print Network [OSTI]

    Neves, Nuno

    and protocols (general purpose network services as well as SCADA specific ones). The third and fourth . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32 3.3.4 Overview and high-level analysis of the data . . . . . . . . . . . . . . 33 3.4 SCADA honeypot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 3.4.1 SCADA honeypot ar

  20. Enhancing the US Power Infrastructure

    SciTech Connect (OSTI)

    Charles Alexander

    2010-05-31T23:59:59.000Z

    The primary motivation for this set of research activities was to develop a foundation in several aspects of power in order to position Cleveland State University to lead a multiuniversity effort to secure funding for enhanced power system projects and to be able to eventually secure a NASA Space Power Systems Center status through the competitive bidding process. This was accomplished by focusing on these major project areas, (1) the design of the next generation nuclear-electric power generation system, (2) the design of a distributed, fault-tolerant, and modular power system, and (3) the development of the dynamics and control of active magnetic bearings for flywheel energy storage without using conventional sensors.

  1. Methodology for prioritizing cyber-vulnerable critical infrastructure equipment and mitigation strategies.

    SciTech Connect (OSTI)

    Dawson, Lon Andrew; Stinebaugh, Jennifer A.

    2010-04-01T23:59:59.000Z

    The Department of Homeland Security (DHS), National Cyber Security Division (NSCD), Control Systems Security Program (CSSP), contracted Sandia National Laboratories to develop a generic methodology for prioritizing cyber-vulnerable, critical infrastructure assets and the development of mitigation strategies for their loss or compromise. The initial project has been divided into three discrete deliverables: (1) A generic methodology report suitable to all Critical Infrastructure and Key Resource (CIKR) Sectors (this report); (2) a sector-specific report for Electrical Power Distribution; and (3) a sector-specific report for the water sector, including generation, water treatment, and wastewater systems. Specific reports for the water and electric sectors are available from Sandia National Laboratories.

  2. Secretary Chu Unveils 41 New Offshore Wind Power R&D Projects...

    Energy Savers [EERE]

    The above map shows the headquarters locations of all 41 projects. Those shown in blue are focused on advancing offshore wind technologies, such as modeling and design of...

  3. LtBlue-LessInk

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Data Aggregation and Analysis PRESENTERS: Danielle Gidding, BPA Erin Rowe, Cadmus Lakin Garth, Cadmus B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2 Project Overview...

  4. BLUE VIEW VISION INSIGHT! Good news--your vision plan

    E-Print Network [OSTI]

    California at Santa Cruz, University of

    WELCOME TO BLUE VIEW VISION INSIGHT! Good news--your vision plan is flexible and easy to use, your discounts, and much more! Blue View Vision InsightSM University of California Student Health Insurance Plan (UC SHIP) 2013/14 Your Blue View Vision Insight Network Blue View Vision Insight offers you

  5. Blue Choice New EnglandSM Summary of Benefits

    E-Print Network [OSTI]

    Aalberts, Daniel P.

    Blue Choice New EnglandSM Summary of Benefits Williams College An Association of Independent Blue Cross and Blue Shield Plans This health plan meets Minimum Creditable Coverage Standards Reform Law. #12;Your Care Your Primary Care Provider. When you enroll in Blue Choice New England, you

  6. BLUE VIEW VISION INSIGHT! Good news--your vision plan

    E-Print Network [OSTI]

    Barrett, Jeffrey A.

    WELCOME TO BLUE VIEW VISION INSIGHT! Good news--your vision plan is flexible and easy to use, your discounts, and much more! Blue View Vision InsightSM University of California Student Health Insurance Plan (UC SHIP) 2012/13 Your Blue View Vision Insight Network Blue View Vision Insight offers you

  7. P\\procedure\\UAVP#20 EMERGENCY BLUE LIGHTS PLACEMENTS & MAINTENANCE

    E-Print Network [OSTI]

    Fernandez, Eduardo

    P\\procedure\\UAVP#20 TITLE: EMERGENCY BLUE LIGHTS ­ PLACEMENTS & MAINTENANCE OBJECTIVE AND PURPOSE: To establish a policy for the installation of new emergency blue lights and the maintenance of existing emergency blue lights. Objective include: Provide adequate emergency blue lights throughout campus. Ensure

  8. U.S. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA...

    Broader source: Energy.gov (indexed) [DOE]

    proposes to use federal funds to design, fabricate, and bring online a biofuel micrf>refinery within existing infrastructure. This project will consist of laboratory research...

  9. Spatial Data Infrastructure of the Plurinational State of Bolivia Spatial Data Infrastructure of the

    E-Print Network [OSTI]

    Köbben, Barend

    Spatial Data Infrastructure of the Plurinational State of Bolivia Spatial Data Infrastructure of the Plurinational State of Bolivia A free and democratic SDI by Raul Fernando Molina Rodriguez and Sylvain Lesage GeoBolivia (Bolivia). rmolina@geo.gob.bo Abstract The Vice Presidency of the State, with the help

  10. The Arabidopsis blue light receptor cryptochrome 2 is a nuclear protein regulated by a blue light-dependent post-

    E-Print Network [OSTI]

    Lin, Chentao

    The Arabidopsis blue light receptor cryptochrome 2 is a nuclear protein regulated by a blue light Charles E. Young Dr. South, Los Angeles, CA 90095-1606, USA Summary Cryptochrome 2 is a ÂŻavin-type blue light receptor mediating ÂŻoral induction in response to photoperiod and a blue light-induced hypocotyl

  11. An Association of Independent Blue Cross and Blue Shield Plans This health plan meets Minimum Creditable Coverage Standards for

    E-Print Network [OSTI]

    Aalberts, Daniel P.

    An Association of Independent Blue Cross and Blue Shield Plans This health plan meets Minimum, as part of the Massachusetts Health Care Reform Law. HMO Blue New EnglandSM Summary of Benefits Williams College #12;Your Care Your Primary Care Provider. When you enroll in HMO Blue New England, you must choose

  12. NAVAJO ELECTRIFICATION DEMONSTRATION PROJECT

    SciTech Connect (OSTI)

    Terry W. Battiest

    2008-06-11T23:59:59.000Z

    The Navajo Electrification Demonstration Project (NEDP) is a multi-year project which addresses the electricity needs of the unserved and underserved Navajo Nation, the largest American Indian tribe in the United States. The program serves to cumulatively provide off-grid electricty for families living away from the electricty infrastructure, line extensions for unserved families living nearby (less than 1/2 mile away from) the electricity, and, under the current project called NEDP-4, the construction of a substation to increase the capacity and improve the quality of service into the central core region of the Navajo Nation.

  13. Securing Infrastructure from High Explosive Threats

    SciTech Connect (OSTI)

    Glascoe, L; Noble, C; Reynolds, J; Kuhl, A; Morris, J

    2009-03-20T23:59:59.000Z

    Lawrence Livermore National Laboratory (LLNL) is working with the Department of Homeland Security's Science and Technology Directorate, the Transportation Security Administration, and several infrastructure partners to characterize and help mitigate principal structural vulnerabilities to explosive threats. Given the importance of infrastructure to the nation's security and economy, there is a clear need for applied research and analyses (1) to improve understanding of the vulnerabilities of these systems to explosive threats and (2) to provide decision makers with time-critical technical assistance concerning countermeasure and mitigation options. Fully-coupled high performance calculations of structural response to ideal and non-ideal explosives help bound and quantify specific critical vulnerabilities, and help identify possible corrective schemes. Experimental validation of modeling approaches and methodologies builds confidence in the prediction, while advanced stochastic techniques allow for optimal use of scarce computational resources to efficiently provide infrastructure owners and decision makers with timely analyses.

  14. Enhancing Energy Infrastructure Resiliency and Addressing Vulnerabilities

    Broader source: Energy.gov [DOE]

    Quadrennial Energy Review Task Force Secretariat and Energy Policy and Systems Analysis Staff, U. S. Department of Energy (DOE) Public Meeting on “Enhancing Resilience in Energy Infrastructure and Addressing Vulnerabilities” On Friday, April 11, 2014, at 10 a.m. in room HVC-215 of the U.S. Capitol, the Department of Energy (DOE), acting as the Secretariat for the Quadrennial Energy Review Task Force, will hold a public meeting to discuss and receive comments on issues related to the Quadrennial Energy Review (QER). The meeting will focus on infrastructure vulnerabilities related to the electricity, natural gas and petroleum transmission, storage and distribution systems (TS&D). The meeting will consist of two facilitated panels of experts on identifying and addressing vulnerabilities within the nation’s energy TS&D infrastructure. Following the panels, an opportunity will be provided for public comment via an open microphone session. The meeting will be livestreamed at energy.gov/live

  15. If you have a Blue Cross Blue Shield of Massachusetts health plan, we've got a healthy incentive for you.

    E-Print Network [OSTI]

    Stoiciu, Mihai

    If you have a Blue Cross Blue Shield of Massachusetts health plan, we've got a healthy incentive for you. As a Blue Cross Blue Shield of Massachusetts subscriber your Fitness Benefit can save you or your Benefit after you've belonged to your health club and been a Blue Cross Blue Shield of Massachusetts

  16. If you have a Blue Cross Blue Shield of Massachusetts health plan, we've got a healthy incentive for you.

    E-Print Network [OSTI]

    Stoiciu, Mihai

    If you have a Blue Cross Blue Shield of Massachusetts health plan, we've got a healthy incentive for you. As a subscriber to Blue Cross Blue Shield of Massachusetts, your Weight Loss Benefit can save you the qualified program in which you enroll. Receipts must show the Blue Cross Blue Shield of Massachusetts member

  17. New HANE Fireball Physics: Implications for US Infrastructure Vulnerability

    SciTech Connect (OSTI)

    Hewett, D W; Larson, D J; Eng, C; Tarwater, A E; Brecht, S H

    2009-01-26T23:59:59.000Z

    The vulnerability of the US infrastructure to High altitude Nuclear Explosions (HANEs) continues to be the object of studies by a number of blue-ribbon panels and commissions. In particular, studies suggest an alarming sensitivity of our electronic infrastructure to some types of ElectroMagnetic Pulse (EMP) while other types of EMP threaten our power distribution systems. Equally or perhaps more important is the concern that a large percentage of our satellites will experience 'upsets' or worse from these same HANE effects. Such studies, however, are all based on the sparse data obtained during the last HANE tests conducted in the early 1960's. A weakness in our present understanding is that almost all the conclusions about distributed-electric-current-driven EMP, with time scales 1/2 second or longer, are interpretations of old data guided by the computational MHD/fluid models available at the time. Fluid models make the assumption that the mean-free-path is zero and thus miss important physics regardless of the model used to couple ion motion to the magnetic field. Even when planetary length scales are modeled so that the gyro radius becomes negligible, the early dynamics of the fireball are not properly captured. The facts are, at relevant altitudes, the explosion expansion is almost unimpeded by the tenuous ionospheric background-particle mean-free-paths are of order 10,000 km. The primary impediment to the debris expansion is the earth's magnetic field bending the energetic ion trajectories emanating from the explosion into circular orbits with typical radii that range from 200 km for heavy ions to 10 km or less for the lighter ions in the debris. These particles thus gyrate many times before they are stopped by a collision with the background atmosphere. Only models that track ion gyro-motion can recover the myriad possibilities through which the complicated, energetic, 'fireball' of debris may evolve. Fireball evolution is important because it determines debris distribution (crucial in satellite vulnerability studies) and generation of low frequency EMP. With the previous considerations as motivation, we have recently reconsidered the early fireball dynamics to see if more appropriate physics models would reveal new insight into some long-standing problems, such as the apparent need for 'jetting' of debris particles to high altitude to explain the observed satellite damage. Additionally, we hoped that the additional physics might reveal new aspects of the early fireball dynamics that could augment the rather incomplete understanding we now have of the EMP generated by such tests.

  18. Bistable defect structures in blue phase devices

    E-Print Network [OSTI]

    A. Tiribocchi; G. Gonnella; D. Marenduzzo; E. Orlandini; F. Salvadore

    2011-10-28T23:59:59.000Z

    Blue phases (BPs) are liquid crystals made up by networks of defects, or disclination lines. While existing phase diagrams show a striking variety of competing metastable topologies for these networks, very little is known as to how to kinetically reach a target structure, or how to switch from one to the other, which is of paramount importance for devices. We theoretically identify two confined blue phase I systems in which by applying an appropriate series of electric field it is possible to select one of two bistable defect patterns. Our results may be used to realise new generation and fast switching energy-saving bistable devices in ultrathin surface treated BPI wafers.

  19. Blue Marble Energy | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia: EnergyAvignon,Belcher HomesLyonsBirchBlockVI JumpBlue HillSeattle,Blue

  20. Blue Square Energy BSE | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof EnergyInnovation in CarbonofBiotins Energia Jump to:Black RiverblogsBlue EnergyBlue

  1. Optimized Pathways for Regional H2 Infrastructure Transitions: The Least-Cost Hydrogen for Southern California

    E-Print Network [OSTI]

    Lin, Zhenhong; Chen, Chien-Wei; Fan, Yueyue; Ogden, Joan M.

    2008-01-01T23:59:59.000Z

    P. Rutter, et al. Hydrogen infrastructure strategic planningModelling of Hydrogen infrastructure for vehicle refuellingof building up a hydrogen infrastructure in Southern

  2. Dynamics in Behavioral Response to Fuel-Cell Vehicle Fleet and Hydrogen Infrastructure: An Exploratory Study

    E-Print Network [OSTI]

    Shaheen, Susan; Martin, Elliot; Lipman, Timothy

    2008-01-01T23:59:59.000Z

    response to FCV and hydrogen infrastructure questions amongits supporting hydrogen infrastructure. In 2006, UC Berke-standing of hydrogen FCVs and infrastructure, researchers at

  3. Analyzing Natural Gas Based Hydrogen Infrastructure - Optimizing Transitions from Distributed to Centralized H2 Production

    E-Print Network [OSTI]

    Yang, Christopher; Ogden, Joan M

    2005-01-01T23:59:59.000Z

    for building up hydrogen infrastructure that are guided byModeling Regional Hydrogen Infrastructure Development . inNATURAL GAS BASED HYDROGEN INFRASTRUCTURE – OPTIMIZING

  4. Optimized Pathways for Regional H2 Infrastructure Transitions: A Case Study for Southern California

    E-Print Network [OSTI]

    Lin, Zhenhong; Fan, Yueyue; Ogden, Joan M; Chen, Chien-Wei

    2008-01-01T23:59:59.000Z

    P. Rutter, et al. Hydrogen infrastructure strategic planningModelling of Hydrogen infrastructure for vehicle refuellingof building up a hydrogen infrastructure in Southern

  5. 2nd International Hydrogen Infrastructure Challenges Webinar

    Broader source: Energy.gov [DOE]

    On Tuesday, March 10, at 8 a.m. EDT, the Fuel Cell Technologies Office will present a webinar to summarize the 2nd international information exchange on the hydrogen refueling infrastructure challenges and potential solutions to support the successful global commercialization of hydrogen fuel cell electric vehicles.

  6. Information Systems as Infrastructure for University Research

    E-Print Network [OSTI]

    Information Systems as Infrastructure for University Research Now and in the Future Merrill Series.......................................................................................................1 Senior Fellow, Association of Public and Land Grant Universities Information Systems Research Stakeholders Soft Power to Connect the Dots in Information Haystacks #12;iv David Swanson

  7. AIFdb: Infrastructure for the Argument Web

    E-Print Network [OSTI]

    Reed, Chris

    AIFdb: Infrastructure for the Argument Web John LAWRENCE, Floris BEX, Chris REED and Mark SNAITH, a database solution for the Ar- gument Web. AIFdb offers an array of web service interfaces allowing a wide Interchange Format, argument web 1. Introduction The Argument Web [3] is a vision for a large-scale Web

  8. Office of Hydrogen, Fuel Cells & Infrastructure Technologies

    E-Print Network [OSTI]

    . Hydrogen Storage 2. Hydrogen Production 3. Fuel Cell Cost Reduction #12;Major Fuel Cell Decisions FuelOffice of Hydrogen, Fuel Cells & Infrastructure Technologies (proposed) Steve Chalk May 6, 2002 #12 DAS Associate DASIndustrial Technologies Implementation A Director Solar Energy Technologies Director

  9. Intrusion-Tolerant Protection for Critical Infrastructures

    E-Print Network [OSTI]

    Neves, Nuno

    of an organization in the face of accidents and attacks. How- ever, they are not simple firewalls but distributed]. In recent years these systems evolved in several aspects that greatly increased their exposure to cyber-attacks, a critical information infrastructure is formed by facilities, like power transformation substations or cor

  10. A Virtual Infrastructure for Wireless Sensor Networks

    E-Print Network [OSTI]

    Stojmenovic, Ivan

    &CHAPTER 4 A Virtual Infrastructure for Wireless Sensor Networks STEPHAN OLARIU and QINGWEN XU Old, and wireless communications 107 Handbook of Sensor Networks: Algorithms and Architectures, Edited by I and communication infra- structures, called wireless sensor networks, will have a significant impact on a wide array

  11. Adaptive Infrastructures Toward a Secure and

    E-Print Network [OSTI]

    Amin, S. Massoud

    concept important to the Electric Power Grid and Energy Infrastructure? ­ A secure "architected" sensing of computer, communication, sensing and control technology which operates in parallel with an electric power grid for the purpose of enhancing the reliability of electric power delivery, minimizing the cost

  12. An Infrastructure for Adaptive Dynamic Optimization

    E-Print Network [OSTI]

    Amarasinghe, Saman

    An Infrastructure for Adaptive Dynamic Optimization Derek Bruening, Timothy Garnett, and Saman,timothyg,saman}@lcs.mit.edu Abstract Dynamic optimization is emerging as a promising ap- proach to overcome many of the obstacles static optimizations, there are very few for developing dynamic optimizations. We present a framework

  13. Towards a Ubiquitous Cloud Computing Infrastructure

    E-Print Network [OSTI]

    van der Merwe, Kobus

    Towards a Ubiquitous Cloud Computing Infrastructure Jacobus Van der Merwe, K.K. Ramakrishnan of a number of cloud computing use cases. We specifically consider cloudbursting and follow-the-sun and focus that are also network service providers. I. INTRODUCTION Cloud computing is rapidly gaining acceptance

  14. Hierarchical Infrastructure for Internet Mapping Services

    E-Print Network [OSTI]

    Samet, Hanan

    locally. We investigate this opportunity for further improvement in providing the client with map data access to remote spatial databases adopted by numerous web-based mapping service vendors (e.g., MapChapter 1 Hierarchical Infrastructure for Internet Mapping Services Frantisek Brabec and Hanan

  15. Polish grid infrastructure for science and research

    E-Print Network [OSTI]

    Ryszard Gokieli; Krzysztof Nawrocki; Adam Padee; Dorota Stojda; Karol Wawrzyniak; Wojciech Wislicki

    2007-10-07T23:59:59.000Z

    Structure, functionality, parameters and organization of the computing Grid in Poland is described, mainly from the perspective of high-energy particle physics community, currently its largest consumer and developer. It represents distributed Tier-2 in the worldwide Grid infrastructure. It also provides services and resources for data-intensive applications in other sciences.

  16. Using Mobile Phone Data for Electricity Infrastructure Planning

    E-Print Network [OSTI]

    Martinez-Cesena, Eduardo Alejandro; Ndiaye, Mamadou; Schläpfer, Markus

    2015-01-01T23:59:59.000Z

    Detailed knowledge of the energy needs at relatively high spatial and temporal resolution is crucial for the electricity infrastructure planning of a region. However, such information is typically limited by the scarcity of data on human activities, in particular in developing countries where electrification of rural areas is sought. The analysis of society-wide mobile phone records has recently proven to offer unprecedented insights into the spatio-temporal distribution of people, but this information has never been used to support electrification planning strategies anywhere and for rural areas in developing countries in particular. The aim of this project is the assessment of the contribution of mobile phone data for the development of bottom-up energy demand models, in order to enhance energy planning studies and existing electrification practices. More specifically, this work introduces a framework that combines mobile phone data analysis, socioeconomic and geo-referenced data analysis, and state-of-the-...

  17. Program Development Tools and Infrastructures

    SciTech Connect (OSTI)

    Schulz, M

    2012-03-12T23:59:59.000Z

    Exascale class machines will exhibit a new level of complexity: they will feature an unprecedented number of cores and threads, will most likely be heterogeneous and deeply hierarchical, and offer a range of new hardware techniques (such as speculative threading, transactional memory, programmable prefetching, and programmable accelerators), which all have to be utilized for an application to realize the full potential of the machine. Additionally, users will be faced with less memory per core, fixed total power budgets, and sharply reduced MTBFs. At the same time, it is expected that the complexity of applications will rise sharply for exascale systems, both to implement new science possible at exascale and to exploit the new hardware features necessary to achieve exascale performance. This is particularly true for many of the NNSA codes, which are large and often highly complex integrated simulation codes that push the limits of everything in the system including language features. To overcome these limitations and to enable users to reach exascale performance, users will expect a new generation of tools that address the bottlenecks of exascale machines, that work seamlessly with the (set of) programming models on the target machines, that scale with the machine, that provide automatic analysis capabilities, and that are flexible and modular enough to overcome the complexities and changing demands of the exascale architectures. Further, any tool must be robust enough to handle the complexity of large integrated codes while keeping the user's learning curve low. With the ASC program, in particular the CSSE (Computational Systems and Software Engineering) and CCE (Common Compute Environment) projects, we are working towards a new generation of tools that fulfill these requirements and that provide our users as well as the larger HPC community with the necessary tools, techniques, and methodologies required to make exascale performance a reality.

  18. Behavioral context of call production by eastern North Pacific blue whales

    E-Print Network [OSTI]

    Oleson, Erin M; Calambokidis, J; Burgess, W C; McDonald, M A; LeDuc, C A; Hildebrand, J A

    2007-01-01T23:59:59.000Z

    by eastern North Pacific blue whales Erin M. Oleson 1, *,context of calls produced by blue whales Balaenoptera mus-North Pacific population of blue whales (Thompson 1965,

  19. Homogeneous blue pattern: A rare presentation in an acral congenital melanocytic nevus

    E-Print Network [OSTI]

    2010-01-01T23:59:59.000Z

    Malvehy J. Homogeneous blue pattern in an acral congenitalof a plantar combined blue nevus: a simulator of melanoma.Homogeneous blue pattern: A rare presentation in an acral

  20. Biogeographic characterization of blue whale song worldwide: Using song to identify populations

    E-Print Network [OSTI]

    McDonald, Mark A; Mesnick, Sarah L; Hildebrand, John A

    2006-01-01T23:59:59.000Z

    Songs of Indian Ocean blue whales, Balaenoptera musculus. (and Gordon, J.C.D. 1991. Blue whales Balaenoptera musculus1982. Vocalisations of the blue whale, Balaenoptera musculus

  1. Tree shelters and weed control enhance growth and survival of natural blue oak seedlings

    E-Print Network [OSTI]

    2011-01-01T23:59:59.000Z

    natural regeneration of blue oaks Initial height Treatmental. 1993. Growth trends of blue oak (Quercus douglasii) in1997. Stand-level status of blue oak sapling recruitment and

  2. The Ocean and Coastal Conservation Guide: The Blue Movement Directory (2005-2006)

    E-Print Network [OSTI]

    Miller, Ryder W.

    2006-01-01T23:59:59.000Z

    where one can plug into The Blue Frontier Campaign. Alsoname. Helvarg (The President of the Blue Frontier Campaign (Conservation Guide: The Blue Movement Directory (2005-2006)

  3. Red-white and blue baby: a case of phacomatosis pigmentovascularis type V

    E-Print Network [OSTI]

    Byrom, Lisa; Surjana, Devita; Yoong, Corinne; Zappala, Tania

    2015-01-01T23:59:59.000Z

    vignette Red-white and blue baby: a case of phacomatosisextensive greyish-blue patches (dermal melanocytosis)addition, marble-like reddish- blue patches consistent with

  4. Building a Community Infrastructure for Scalable On-Line Performance Analysis Tools around Open|Speedshop

    SciTech Connect (OSTI)

    Miller, Barton

    2014-06-30T23:59:59.000Z

    Peta-scale computing environments pose significant challenges for both system and application developers and addressing them required more than simply scaling up existing tera-scale solutions. Performance analysis tools play an important role in gaining this understanding, but previous monolithic tools with fixed feature sets have not sufficed. Instead, this project worked on the design, implementation, and evaluation of a general, flexible tool infrastructure supporting the construction of performance tools as “pipelines” of high-quality tool building blocks. These tool building blocks provide common performance tool functionality, and are designed for scalability, lightweight data acquisition and analysis, and interoperability. For this project, we built on Open|SpeedShop, a modular and extensible open source performance analysis tool set. The design and implementation of such a general and reusable infrastructure targeted for petascale systems required us to address several challenging research issues. All components needed to be designed for scale, a task made more difficult by the need to provide general modules. The infrastructure needed to support online data aggregation to cope with the large amounts of performance and debugging data. We needed to be able to map any combination of tool components to each target architecture. And we needed to design interoperable tool APIs and workflows that were concrete enough to support the required functionality, yet provide the necessary flexibility to address a wide range of tools. A major result of this project is the ability to use this scalable infrastructure to quickly create tools that match with a machine architecture and a performance problem that needs to be understood. Another benefit is the ability for application engineers to use the highly scalable, interoperable version of Open|SpeedShop, which are reassembled from the tool building blocks into a flexible, multi-user interface set of tools. This set of tools targeted at Office of Science Leadership Class computer systems and selected Office of Science application codes. We describe the contributions made by the team at the University of Wisconsin. The project built on the efforts in Open|SpeedShop funded by DOE/NNSA and the DOE/NNSA Tri-Lab community, extended Open|Speedshop to the Office of Science Leadership Class Computing Facilities, and addressed new challenges found on these cutting edge systems. Work done under this project at Wisconsin can be divided into two categories, new algorithms and techniques for debugging, and foundation infrastructure work on our Dyninst binary analysis and instrumentation toolkits and MRNet scalability infrastructure.

  5. Europe's liquid commons : towards a public territorial infrastructure

    E-Print Network [OSTI]

    De Vries, Christoper (Christoper Hendrick John)

    2011-01-01T23:59:59.000Z

    'his thesis examines the possibility of using intermodal logistics infrastructure on the Rhine-Danube waterway, as part of the Trans European Infrastructure Network, as a means to create a symbolic and operative commons ...

  6. Status Report on Protected Domains for Cyber Infrastructure Management

    E-Print Network [OSTI]

    Irvine, Cynthia E.

    through the use of distributed, highly secure, protected domains. Instead of creating a costly physically, Network Security, Information Assurance 1 Introduction Currently, our national cyber infrastructure to the President for Cyber Space Security and Chairman, President's Critical Infrastructure Protection Board

  7. Shoring up Infrastructure Weaknesses with Hybrid Cloud Storage

    E-Print Network [OSTI]

    Chaudhuri, Surajit

    Shoring up Infrastructure Weaknesses with Hybrid Cloud Storage #12;2StorSimple White Pages: Shoring Up Infrastructure Weaknesses with Hybrid Cloud Storage Table of Contents The Hybrid Cloud Context for IT Managers ............................................................. 3 The Bottleneck of Managing Storage

  8. Natural Gas Infrastructure R&D and Methane Emissions Mitigation...

    Broader source: Energy.gov (indexed) [DOE]

    Natural Gas Infrastructure R&D and Methane Emissions Mitigation Workshop Natural Gas Infrastructure R&D and Methane Emissions Mitigation Workshop November 12, 2014 11:00AM EST to...

  9. Year-in-Review: 2011 Energy Infrastructure Events and Expansions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Energy Infrastructure Events and Expansions (April 2012) Year-in-Review: 2011 Energy Infrastructure Events and Expansions (April 2012) The 2011 Year-in-Review (YIR) provides a...

  10. Building Dynamic Computing Infrastructures over Distributed Clouds Pierre Riteau

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Building Dynamic Computing Infrastructures over Distributed Clouds Pierre Riteau University--The emergence of cloud computing infrastructures brings new ways to build and manage computing systems objectives. First, leveraging virtualization and cloud computing infrastruc- tures to build distributed large

  11. Infrastructure for large-scale tests in marine autonomy

    E-Print Network [OSTI]

    Hummel, Robert A. (Robert Andrew)

    2012-01-01T23:59:59.000Z

    This thesis focuses on the development of infrastructure for research with large-scale autonomous marine vehicle fleets and the design of sampling trajectories for compressive sensing (CS). The newly developed infrastructure ...

  12. Built Systems and Other Infrastructure Webinar | Department of...

    Energy Savers [EERE]

    Built Systems and Other Infrastructure Webinar Built Systems and Other Infrastructure Webinar April 10, 2014 5:00PM to 6:30PM EDT The federal government, state governments, and...

  13. 16.Feb.2005 MC meeting, LBNL 1 CERN infrastructureCERN infrastructure

    E-Print Network [OSTI]

    McDonald, Kirk

    16.Feb.2005 MC meeting, LBNL 1 CERN infrastructureCERN infrastructure A.FabichA.Fabich, CERN AB://cern.ch/projhttp://cern.ch/proj--hiptargethiptarget #12;16.Feb.2005 MC meeting, LBNL 2 Experimental requirementsExperimental requirements What CERN couldSupport on installationinstallation CryogenicsCryogenics solenoid powersolenoid power SafetySafety #12;16.Feb.2005 MC meeting, LBNL 3

  14. Numerical Results for the Blue Phases

    E-Print Network [OSTI]

    G. P. Alexander; J. M. Yeomans

    2009-06-04T23:59:59.000Z

    We review recent numerical work investigating the equilibrium phase diagram, and the dynamics, of the cholesteric blue phases. In equilibrium numerical results confirm the predictions of the classic analytical theories, and extend them to incorporate different values of the elastic constants, or the effects of an applied electric field. There is a striking increase in the stability of blue phase I in systems where the cholesteric undergoes helical sense inversion, and the anomalous electrostriction observed in this phase is reproduced. Solving the equations of motion allows us to present results for the phase transition kinetics of blue phase I under dielectric or flexoelectric coupling to an applied electric field. We also present simulations of the blue phases in a flow field, showing how the disclination network acts to oppose the flow. The results are based on the Landau-de Gennes exapnsion of the liquid crystal free energy: that such a simple and elegant theory can predict such complex and subtle physical behaviour is remarkable.

  15. Switching dynamics in cholesteric blue phases

    E-Print Network [OSTI]

    A. Tiribocchi; G. Gonnella; D. Marenduzzo; E. Orlandini

    2011-03-30T23:59:59.000Z

    Blue phases are networks of disclination lines, which occur in cholesteric liquid crystals near the transition to the isotropic phase. They have recently been used for the new generation of fast switching liquid crystal displays. Here we study numerically the steady states and switching hydrodynamics of blue phase I (BPI) and blue phase II (BPII) cells subjected to an electric field. When the field is on, there are three regimes: for very weak fields (and strong anchoring at the boundaries) the blue phases are almost unaffected, for intermediate fields the disclinations twist (for BPI) and unzip (for BPII), whereas for very large voltages the network dissolves in the bulk of the cell. Interestingly, we find that a BPII cell can recover its original structure when the field is switched off, whereas a BPI cell is found to be trapped more easily into metastable configurations. The kinetic pathways followed during switching on and off entails dramatic reorganisation of the disclination networks. We also discuss the effect of changing the director field anchoring at the boundary planes and of varying the direction of the applied field.

  16. Information Security Management System for Microsoft's Cloud Infrastructure

    E-Print Network [OSTI]

    Chaudhuri, Surajit

    Information Security Management System for Microsoft's Cloud Infrastructure Online Services ......................................................................................................................................................................................1 Information Security Management System.......................................................................................................................7 Information Security Management Forum

  17. WHEN THE BLUE-GREEN WATERS TURN RED

    E-Print Network [OSTI]

    WHEN THE BLUE-GREEN WATERS TURN RED Historical Flooding in Havasu Creek, Arizona U.S. GEOLOGICAL OF RECLAMATION #12;WHEN THE BLUE-GREEN WATERS TURN RED Historical Flooding in Havasu Creek, Arizona By THEODORE S

  18. LOUISIANA TECH UNIVERSITY REGAL BLUES DANCE CLINIC MARCH 22, 2014

    E-Print Network [OSTI]

    Selmic, Sandra

    LOUISIANA TECH UNIVERSITY REGAL BLUES DANCE CLINIC MARCH 22, 2014 WHO CAN ATTEND? The clinic is for all dancers grades 7-12 who are interested in learning dance routines from the Regal Blues. This clinic will also help any

  19. Green Lands Blue Water 2014 Fall Conference | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Green Lands Blue Water 2014 Fall Conference Green Lands Blue Water 2014 Fall Conference November 18, 2014 10:00AM CST to November 20, 2014 4:00PM CST Richland Community College...

  20. Scanning the Issue Special Issue on Energy Infrastructure Defense Systems

    E-Print Network [OSTI]

    Amin, S. Massoud

    Outage Task Force 2003 places the focus directly on the infrastructure of electric power. This blackout of infrastructure in the United States. Electricity, water, telephone, the Internet, and other physical and logistic American electrical grid. Both the importance and difficulty of protecting energy infrastructure against

  1. Modelling Interdependencies between the Electricity and Information Infrastructures

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    in the information infrastructure can be addressed. 1 Introduction In the past decades, the electric power grid of the electric grid infrastructures and their interdependencies. The large geographic extension of power failures: the electric power infra- structure and the information infrastructures supporting management, control and hal

  2. FINAL CONTENT SUBJECT TO CHANGE CONTROLLED HYDROGEN FLEET AND INFRASTRUCTURE

    E-Print Network [OSTI]

    DRAFT FINAL CONTENT SUBJECT TO CHANGE CONTROLLED HYDROGEN FLEET AND INFRASTRUCTURE DEMONSTRATION that complements FreedomCAR to develop both a low-cost hydrogen infrastructure and advanced hydrogen fuel cell a strategy to develop a hydrogen economy that emphasizes co-developing hydrogen infrastructure in parallel

  3. Impact of Natural Gas Infrastructure on Electric Power Systems

    E-Print Network [OSTI]

    Fu, Yong

    Impact of Natural Gas Infrastructure on Electric Power Systems MOHAMMAD SHAHIDEHPOUR, FELLOW, IEEE of electricity has introduced new risks associated with the security of natural gas infrastructure on a sig the essence of the natural gas infrastructure for sup- plying the ever-increasing number of gas-powered units

  4. California Low Carbon Fuels Infrastructure Investment Initiative...

    Broader source: Energy.gov (indexed) [DOE]

    Markets * 2010 - 9 stations * 2011 - 6 stations * 2012 - 1 station New Station Pipeline * 2012 - 29 stations * 2013 - 31 projected stations * 2014 - Completion of projected...

  5. A New Project Execution Methodology; Integrating Project Management Principles with Quality Project Execution Methodologies

    E-Print Network [OSTI]

    Schriner, Jesse J.

    2008-07-25T23:59:59.000Z

    Approach ........................................................................................3 The ITIL Approach ..................................................................................................5 Quality Project Methodologies Summary.... 2006. Six Sigma for IT Management. Van Haren Publishing. The main purpose of this book is to both introduce Six Sigma and Information Technology Infrastructure Library (ITIL) and then integrate the two methodologies for application...

  6. Well Log Data At Blue Mountain Geothermal Area (Fairbank & Niggemann...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Well Log Data At Blue Mountain Geothermal Area (Fairbank & Niggemann, 2004) Exploration Activity Details...

  7. Conceptual Model At Blue Mountain Geothermal Area (Faulds & Melosh...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Conceptual Model At Blue Mountain Geothermal Area (Faulds & Melosh, 2008) Exploration Activity Details Location...

  8. Exploratory Boreholes At Blue Mountain Geothermal Area (Parr...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Exploratory Boreholes At Blue Mountain Geothermal Area (Parr & Percival, 1991) Exploration Activity Details Location...

  9. Alcian Blue Cartilage Staining Beatrice Jegalian & Eddy M. De Robertis

    E-Print Network [OSTI]

    De Robertis, Eddy M.

    Alcian Blue Cartilage Staining Beatrice Jegalian & Eddy M. De Robertis (Cell 71, 901-910, 1992) 1 will require more time) in 0.05% Alcian blue 8GX (Fisher) in 5% acetic acid. 6. Wash embryos in 5% acetic acid Alcian Blue 8 g NaCl 0.05% Alcian blue 8GX .2 g KCl 5% acetic acid 1.44 g Na2HPO4 water .24 g KH2PO4 800

  10. Tank waste remediation system privatization infrastructure program requirements and document management process guide

    SciTech Connect (OSTI)

    ROOT, R.W.

    1999-05-18T23:59:59.000Z

    This guide provides the Tank Waste Remediation System Privatization Infrastructure Program management with processes and requirements to appropriately control information and documents in accordance with the Tank Waste Remediation System Configuration Management Plan (Vann 1998b). This includes documents and information created by the program, as well as non-program generated materials submitted to the project. It provides appropriate approval/control, distribution and filing systems.

  11. Synthesis and acid-resistance of Maya blue pigment

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    1 Synthesis and acid-resistance of Maya blue pigment M. Sánchez del Río[1], P. Martinetto [2], C, Departamento de Geología, E-37008 Salamanca, Spain Abstract Maya blue is an organo-clay artificial pigment (VIII-XVI cent.). We analyse in this paper one of the characteristics of Maya blue that attracted

  12. Jose Groh (Geneva Observatory, Switzerland) Luminous Blue Variables

    E-Print Network [OSTI]

    Crowther, Paul

    Jose Groh (Geneva Observatory, Switzerland) Luminous Blue Variables: massive stars extremely close Groh - Luminous BlueVariables: massive stars extremely close to the Eddington limit JD2:Very massive Jose Groh - Luminous BlueVariables: massive stars extremely close to the Eddington limit JD2:Very

  13. Polymer-stabilized blue phase liquid crystals: a tutorial [Invited

    E-Print Network [OSTI]

    Wu, Shin-Tson

    Polymer-stabilized blue phase liquid crystals: a tutorial [Invited] Jin Yan and Shin-Tson Wu@mail.ucf.edu Abstract: Blue phase liquid crystals exhibit several attractive features, such as self-assembled three, and submillisecond response time. This tutorial gives step-by-step introduction on basic blue- phase materials

  14. Blue oak seedlings may be older than they look

    E-Print Network [OSTI]

    Standiford, Richard B.

    Blue oak seedlings may be older than they look Ralph L. Phillips u Neil K. McDougald o Richard B. Standiford William E.Frost A 4-year study indicates that na- tive blue oak seedlings are prob- ably much the year of above- average rainfall. Blue oak (Quercusdouglasii)trees are a valuable economic and aesthetic

  15. Blue Noise through Optimal Transport Fernando de Goes

    E-Print Network [OSTI]

    Desbrun, Mathieu

    Blue Noise through Optimal Transport Fernando de Goes Caltech Katherine Breeden Stanford Victor high-quality blue noise point distributions of arbitrary density functions. At its core is a novel diagrams. Our mathematical, algorithmic, and practical contributions lead to high-quality blue noise point

  16. Alcian Blue Alizarin Red Skeletal Staining October 2003

    E-Print Network [OSTI]

    De Robertis, Eddy M.

    Alcian Blue ­ Alizarin Red Skeletal Staining October 2003 Eddy M. De Robertis 1. Dissect mice damage. 3. Replace 95% ethanol with Alcian blue staining solution for 1-3 days slowly rocking at room days. 4. Replace Alcian blue solution with 95% ethanol for 6 hours slowly rocking at room temperature

  17. Blue Lacuna: Lessons Learned Writing the World's Longest Interactive Fiction

    E-Print Network [OSTI]

    California at Santa Cruz, University of

    1 Blue Lacuna: Lessons Learned Writing the World's Longest Interactive Fiction Aaron A. Reed Abstract--Blue Lacuna is a new long form interactive fic- tion comprising nearly 400,000 words of prose play time of fifteen to twenty hours. In development between 2006 and 2009, Blue Lacuna fea- tures

  18. Blue Solid-State Photoluminescence and Electroluminescence from Novel

    E-Print Network [OSTI]

    Myrick, Michael Lenn

    Blue Solid-State Photoluminescence and Electroluminescence from Novel Poly copolymers give rise to efficient ( ) 0.16-0.76) blue solid-state emission (max ) 422-443 nm) which can-PPE (max 500-520 nm). The effective and blue-shifted solid-state emission is a result of disrupting

  19. BLUE: An Interactive Visualization System for Categorical Data Technical Note

    E-Print Network [OSTI]

    Kerbs, R. W.

    BLUE: An Interactive Visualization System for Categorical Data Technical Note Robert W. Kerbs. This paper introduces a prototype data visualization system, BLUE, to help induce meaningful decision trees from databases that contain primarily categorical attributes. BLUE is an interactive model creation

  20. ANCHIALINE ECOSYSTEMS Microbial hotspots in anchialine blue holes

    E-Print Network [OSTI]

    Iliffe, Thomas M.

    ANCHIALINE ECOSYSTEMS Microbial hotspots in anchialine blue holes: initial discoveries from+Business Media B.V. 2011 Abstract Inland blue holes of the Bahamas are anchialine ecosystems with distinct fresh and geomicrobiology exploration of blue holes are providing a first glimpse of the geochemistry and microbial life