1

Proposal for the award of a contract for the design, supply, installation and commissioning of Heating, Ventilation and Air-Conditioning (HVAC) systems for the PS accelerator infrastructure  

E-Print Network [OSTI]

Proposal for the award of a contract for the design, supply, installation and commissioning of Heating, Ventilation and Air-Conditioning (HVAC) systems for the PS accelerator infrastructure

2012-01-01T23:59:59.000Z

2

Proposal to negotiate an amendment to an existing contract for the supply and installation of an HVAC system for the HIE-ISOLDE infrastructure  

E-Print Network [OSTI]

Proposal to negotiate an amendment to an existing contract for the supply and installation of an HVAC system for the HIE-ISOLDE infrastructure

2014-01-01T23:59:59.000Z

3

Models and Solution Approaches for Development and Installation of PEV Infrastructure  

E-Print Network [OSTI]

). PEVs represent solution to these concerns in that they provide higher fuel efficiency and lower greenhouse gas (GHG) emissions than internal combustion engine vehicles1 (ICEVs). The market for PEVs has been steadily growing. Recently, rising gas... in PEVs is one of the key barriers in the more widespread adoption of PEV. Drivers who have long-distance commutes hesitate to replace their ICEVs with PEVs due to range anxiety. In this situation, PEV infrastructure could encourage people to replace...

Kim, Seok

2012-02-14T23:59:59.000Z

4

Electrolytic hydrogen production infrastructure options evaluation. Final subcontract report  

SciTech Connect (OSTI)

Fuel-cell electric vehicles have the potential to provide the range, acceleration, rapid refueling times, and other creature comforts associated with gasoline-powered vehicles, but with virtually no environmental degradation. To achieve this potential, society will have to develop the necessary infrastructure to supply hydrogen to the fuel-cell vehicles. Hydrogen could be stored directly on the vehicle, or it could be derived from methanol or other hydrocarbon fuels by on-board chemical reformation. This infrastructure analysis assumes high-pressure (5,000 psi) hydrogen on-board storage. This study evaluates one approach to providing hydrogen fuel: the electrolysis of water using off-peak electricity. Other contractors at Princeton University and Oak Ridge National Laboratory are investigating the feasibility of producing hydrogen by steam reforming natural gas, probably the least expensive hydrogen infrastructure alternative for large markets. Electrolytic hydrogen is a possible short-term transition strategy to provide relatively inexpensive hydrogen before there are enough fuel-cell vehicles to justify building large natural gas reforming facilities. In this study, the authors estimate the necessary price of off-peak electricity that would make electrolytic hydrogen costs competitive with gasoline on a per-mile basis, assuming that the electrolyzer systems are manufactured in relatively high volumes compared to current production. They then compare this off-peak electricity price goal with actual current utility residential prices across the US.

Thomas, C.E.; Kuhn, I.F. Jr. [Directed Technologies, Inc., Arlington, VA (United States)

1995-09-01T23:59:59.000Z

5

Simulative Evaluation of a UMTS-based Car-to-Infrastructure Traffic Information System  

E-Print Network [OSTI]

to that of direct radio links. A key question asked about an infrastructure-based C2I communication systemSimulative Evaluation of a UMTS-based Car-to-Infrastructure Traffic Information System (Invited are heavily dependent on high market penetration or infrastructure support. Third-generation (3G) networks

Breu, Ruth

6

Experimental Evaluation of Installed Cooking Exhaust Fan Performance  

SciTech Connect (OSTI)

The installed performance of cooking exhaust fans was evaluated through residential field experiments conducted on a sample of 15 devices varying in design and other characteristics. The sample included two rear downdraft systems, two under-cabinet microwave over range (MOR) units, three different installations of an under-cabinet model with grease screens across the bottom and no capture hood, two devices with grease screens covering the bottom of a large capture hood (one under-cabinet, one wall-mount chimney), four under-cabinet open hoods, and two open hoods with chimney mounts over islands. Performance assessment included measurement of airflow and sound levels across fan settings and experiments to quantify the contemporaneous capture efficiency for the exhaust generated by natural gas cooking burners.Capture efficiency is defined as the fraction of generated pollutants that are removed through the exhaust and thus not available for inhalation of household occupants. Capture efficiency (CE) was assessed for various configurations of burner use (e.g., single front, single back, combination of one front and one back, oven) and fan speed setting. Measured airflow rates were substantially lower than the levels noted in product literature for many of the units. This shortfall was observed for several units costing in excess of $1000. Capture efficiency varied widely (from<5percent to roughly 100percent) across devices and across conditions for some devices. As expected, higher capture efficiencies were achieved with higher fan settings and the associated higher air flow rates. In most cases, capture efficiencies were substantially higher for rear burners than for front burners. The best and most consistent performance was observed for open hoods that covered all cooktop burners and operated at higher airflow rates. The lowest capture efficiencies were measured when a front burner was used with a rear backdraft system or with lowest fan setting for above the range systems that do not cover the front burners.

Singer, Brett C.; Delp, William W.; Apte, Michael G.

2010-11-01T23:59:59.000Z

7

Proposal for the award of a contract for the design, supply, installation and commissioning of a Heating Ventilation and Air Conditioning (HVAC) system for the HIE-ISOLDE infrastructure  

E-Print Network [OSTI]

Proposal for the award of a contract for the design, supply, installation and commissioning of a Heating Ventilation and Air Conditioning (HVAC) system for the HIE-ISOLDE infrastructure

2012-01-01T23:59:59.000Z

8

A Framework for Evaluating Intrusion Detection Architectures in Advanced Metering Infrastructures  

E-Print Network [OSTI]

-security Risk Management Process (RMP) tailored to smart grids [2]. In this paper we leverage information from1 A Framework for Evaluating Intrusion Detection Architectures in Advanced Metering Infrastructures] and apply them to the specific case of AMI networks in which asset owners are evaluating the use of an IDS

Sanders, William H.

9

Electric Drive Vehicle Demonstration and Vehicle Infrastructure Evaluation  

Broader source: Energy.gov [DOE]

2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

10

EVALUATION OF A PROTOTYPE SOLAR AWNING A prototype solar awning has been designed and installed on  

E-Print Network [OSTI]

and installed on a University of Oregon campus building. The solar awning is composed of a light shelfEVALUATION OF A PROTOTYPE SOLAR AWNING ABSTRACT A prototype solar awning has been designed with photovoltaic modules at- tached tilted 20° to the south. An interior light shelf and LED lights have been

Oregon, University of

11

Structural evaluation of mixer pump installed in Tank 241-AN-107 for caustic addition project  

SciTech Connect (OSTI)

This report documents the structural analysis and evaluation of a mixer pump and caustic addition system to be used in Tank 107-AN. This pump will be installed in the central pump pit of this double- shell tank for the purpose of bringing the hydroxide ion concentration into compliance with Tank Farm operating specifications.

Leshikar, G.A.

1995-06-16T23:59:59.000Z

12

Evaluation of Aqua-Ammonia Chiller Technologies and Field Site Installation  

SciTech Connect (OSTI)

The Naval Facilities Engineering Service Center (NFESC) has sponsored Oak Ridge National Laboratory (ORNL) to review, select, and evaluate advanced, gas-fired, 5-ton, aqua-ammonia, chiller technologies. The selection criteria was that units have COP values of 0.67 or better at Air-conditioning and Refrigeration Institute (ARI) 95 F outdoor rating conditions, an active refrigerant flow control, and a variable-speed condenser fan. These features are expected to allow these units to operate at higher ambient temperatures (up to the maximum operating temperature of 110 F) with minimal degradation in performance. ORNL evaluated three potential manufacturers of advanced, gas-fired, 5-ton, aqua-ammonia chillers-Robur, Ambian, and Cooling Technologies. Unfortunately, Robur did not meet the COP requirements and Cooling Technologies could not deliver a unit to be tested at the U.S. Department of Energy (DOE)-ORNL environmental chamber testing facility for thermally activated heat pumps. This eliminated these two technologies from further consideration, leaving only the Ambian chillers for evaluation. Two Ambian chillers were evaluated at the DOE-ORNL test facility. Overall these chillers operated well over a wide range of ambient conditions with minimal degradation in performance due to several control strategies used such as a variable speed condenser fan, a modulating burner, and active refrigerant flow control. These Ambian pre-commercial units were selected for installation and field testing at three federal facilities. NFESC worked with ORNL to assist with the site selection for installation and evaluation of these chillers. Two sites (ORNL and Naval Surface Warfare Center [NSWC] Corona) had a single chiller unit installed; and at one site (Naval Amphibious Base [NAB] Little Creek), two 5-ton chillers linked together were installed to provide 10 tons of cooling. A chiller link controller developed under this project was evaluated in the field test at Little Creek.

Zaltash, Abdolreza [ORNL

2007-09-01T23:59:59.000Z

13

Electric Drive Vehicle Demonstration and Vehicle Infrastructure...  

Broader source: Energy.gov (indexed) [DOE]

Electric Drive Vehicle Demonstration and Vehicle Infrastructure Evaluation Electric Drive Vehicle Demonstration and Vehicle Infrastructure Evaluation 2010 DOE Vehicle Technologies...

14

Measurement-Based Evaluation of Installed Filtration System Performance in Single-Family Homes  

SciTech Connect (OSTI)

This guide discusses important study design issues to consider when conducting an on-site evaluation of filtration system performance. The two most important dichotomies to consider in developing a study protocol are (1) whether systems are being evaluated in occupied or unoccupied homes and (2) whether different systems are being compared in the same homes or if the comparison is between systems installed in different homes. This document provides perspective and recommendations about a suite of implementation issues including the choice of particle measurement devices, selection of sampling locations, ways to control and/or monitor factors and processes that can impact particle concentrations, and data analysis approaches.

Chan, Wanyu Rengie; Singer, Brett C.

2014-04-03T23:59:59.000Z

15

Project identification and evaluation techniques for transportation infrastructure : assessing their role in metropolitan areas of developing countries  

E-Print Network [OSTI]

Project identification and evaluation of transportation infrastructure play a vital role in shaping and sustaining the forms of cities all over the world. These cities differ substantially in character and urban form and ...

Kumar, Vimal, S.M. Massachusetts Institute of Technology

2009-01-01T23:59:59.000Z

16

ELECTRICAL SUBSTATION RELIABILITY EVALUATION WITH EMPHASIS ON EVOLVING INTERDEPENDENCE ON COMMUNICATION INFRASTRUCTURE.  

SciTech Connect (OSTI)

The objective of this study is to develop a methodology for a probabilistic assessment of the reliability and security of electrical energy distribution networks. This includes consideration of the future grid system, which will rely heavily on the existing digitally based communication infrastructure for monitoring and protection. Another important objective of this study is to provide information and insights from this research to Consolidated Edison Company (Con Edison) that could be useful in the design of the new network segment to be installed in the area of the World Trade Center in lower Manhattan. Our method is microscopic in nature and relies heavily on the specific design of the portion of the grid being analyzed. It extensively models the types of faults that a grid could potentially experience, the response of the grid, and the specific design of the protection schemes. We demonstrate that the existing technology can be extended and applied to the electrical grid and to the supporting communication network. A small subsection of a hypothetical grid based on the existing New York City electrical grid system of Con Edison is used to demonstrate the methods. Sensitivity studies show that in the current design the frequency for the loss of the main station is sensitive to the communication network reliability. The reliability of the communication network could become a more important contributor to the electrical grid reliability as the utilization of the communication network significantly increases in the near future to support ''smart'' transmission and/or distributed generation. The identification of potential failure modes and their likelihood can support decisions on potential modifications to the network including hardware, monitoring instrumentation, and protection systems.

AZARM,M.A.BARI,R.A.MUSICKI,Z.

2004-01-15T23:59:59.000Z

17

Michigan E85 Infrastructure  

SciTech Connect (OSTI)

This is the final report for a grant-funded project to financially assist and otherwise provide support to projects that increase E85 infrastructure in Michigan at retail fueling locations. Over the two-year project timeframe, nine E85 and/or flex-fuel pumps were installed around the State of Michigan at locations currently lacking E85 infrastructure. A total of five stations installed the nine pumps, all providing cost share toward the project. By using cost sharing by station partners, the $200,000 provided by the Department of Energy facilitated a total project worth $746,332.85. This project was completed over a two-year timetable (eight quarters). The first quarter of the project focused on project outreach to station owners about the incentive on the installation and/or conversion of E85 compatible fueling equipment including fueling pumps, tanks, and all necessary electrical and plumbing connections. Utilizing Clean Energy Coalition (CEC) extensive knowledge of gasoline/ethanol infrastructure throughout Michigan, CEC strategically placed these pumps in locations to strengthen the broad availability of E85 in Michigan. During the first and second quarters, CEC staff approved projects for funding and secured contracts with station owners; the second through eighth quarters were spent working with fueling station owners to complete projects; the third through eighth quarters included time spent promoting projects; and beginning in the second quarter and running for the duration of the project was spent performing project reporting and evaluation to the US DOE. A total of 9 pumps were installed (four in Elkton, two in Sebewaing, one in East Lansing, one in Howell, and one in Whitmore Lake). At these combined station locations, a total of 192,445 gallons of E85, 10,786 gallons of E50, and 19,159 gallons of E30 were sold in all reporting quarters for 2011. Overall, the project has successfully displaced 162,611 gallons (2,663 barrels) of petroleum, and reduced regional GHG emissions by 375 tons in the first year of station deployment.

Sandstrom, Matthew M.

2012-03-30T23:59:59.000Z

18

Impact evaluation of a refrigeration control system installed at Vitamilk Dairy, Incorporated under the Energy $avings Plan  

SciTech Connect (OSTI)

This impact evaluation of a refrigeration control system (RCS) recently installed at Vitamilk Dairy, Inc. (Vitamilk) was conducted for the Bonneville Power Administration (Bonneville) as part of an evaluation of its Energy $avings Plan (E$P) Program. The RCS installation at Vitamilk uses microcomputer- based controls to automate refrigeration equipment previously controlled manually. This impact evaluation assessed how much electricity is being saved at Vitamilk as a result of the E$P and to determine how much the savings cost Bonneville and the region. On a unit savings basis, this project will save 9.7 kWh/tonne (8-8 kWh/ton) of milk and ice cream produced, based on the product mix for June 1992 through May 1993, representing a 28% reduction in energy consumption. The project was installed in 1992 for a total cost of $129,330, and Vitamilk received payment of $62,974 from Bonneville in 1993 for the acquisition of energy savings. The real levelized cost of these energy savings to Bonneville is 8.5 mills/kWh (in 1993 dollars) over the project`s assumed 15-year life, and the real levelized cost to the region is 17.9 mills/kWh (in 1993 dollars), not including transmission and distribution effects. Based on the expected project installation costs and energy savings benefits, the RCS would not have been implemented by Vitamilk without the E$P acquisition payment. The expected acquisition payment reduced the estimated payback period from 7.0 to 2.8 years. Although Vitamilk would generally require an energy conservation project to have a payback period of two years or less, the slightly longer payback period was accepted in this case.

Brown, D.R.; Dixon, D.R.; Spanner, G.E.

1995-01-01T23:59:59.000Z

19

Hydrogen, Fuel Cells and Infrastructure Technologies Program...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Hydrogen, Fuel Cells and Infrastructure Technologies Program FY2003 Merit Review and Peer Evaluation Report Hydrogen, Fuel Cells and Infrastructure Technologies Program FY2003...

20

Hydrogen Infrastructure Transition Analysis: Milestone Report  

SciTech Connect (OSTI)

This milestone report identifies a minimum infrastructure that could support the introduction of hydrogen vehicles and develops and evaluates transition scenarios supported by this infrastructure.

Melendez, M.; Milbrandt, A.

2006-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "infrastructure evaluation installation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Evaluation of the utilities energy monitoring and control system installed at the US Army, Europe, Pirmasens and 97th Base Support Battalion, Germany  

SciTech Connect (OSTI)

Authorized under an interagency agreements between the US Department of Energy and the US Army, evaluation of the utilities energy monitoring and control system (UEMCSs) operating at selected US Army installations in Heidelberg, Goeppingen, Pirmasens, and Baumholder, Germany, is nearing completion. This report specifically presents the results of the evaluation of the UEMCS installed at USAREUR, 21st Theater Army Area Command (TAACOM), Pirmasens and 97th Base Support Battalion, which is operated by the Directorate of Engineering and Housing (DEH) Utilities Division. The Oak Ridge National Laboratory (ORNL) was selected by Headquarters, USAREUR, Facilities Engineering Division, Utilities and Energy Branch in Heidelberg to evaluated the overall effectiveness and energy efficiency of UEMCSs at four US Army installations in Germany. The third of these systems to be evaluated, which is the scope of this report, is the UEMCS installed at Pirmasens. This evaluation relies upon existing data and information and does not involve introducing metering and instrumentation for the purpose of measuring installation energy use. The primary purpose of this evaluation is to take an in-depth look at the overall performance and effectiveness of the UEMCS installed at Pirmasens to see if it is achieving its operational objectives by resulting in energy and cost savings.

Broders, M.A.; McConnell, B.W.

1992-01-01T23:59:59.000Z

22

Battery Ownership Model: A Tool for Evaluating the Economics of Electrified Vehicles and Related Infrastructure; Preprint  

SciTech Connect (OSTI)

Electric vehicles could significantly reduce greenhouse gas (GHG) emissions and dependence on imported petroleum. However, for mass adoption, EV costs have historically been too high to be competitive with conventional vehicle options due to the high price of batteries, long refuel time, and a lack of charging infrastructure. A number of different technologies and business strategies have been proposed to address some of these cost and utility issues: battery leasing, battery fast-charging stations, battery swap stations, deployment of charge points for opportunity charging, etc. In order to investigate these approaches and compare their merits on a consistent basis, the National Renewable Energy Laboratory (NREL) has developed a new techno-economic model. The model includes nine modules to examine the levelized cost per mile for various types of powertrain and business strategies. The various input parameters such as vehicle type, battery, gasoline, and electricity prices; battery cycle life; driving profile; and infrastructure costs can be varied. In this paper, we discuss the capabilities of the model; describe key modules; give examples of how various assumptions, powertrain configurations, and business strategies impact the cost to the end user; and show the vehicle's levelized cost per mile sensitivity to seven major operational parameters.

O'Keefe, M.; Brooker, A.; Johnson, C.; Mendelsohn, M.; Neubauer, J.; Pesaran, A.

2011-01-01T23:59:59.000Z

23

Fleet Evaluation and Factory Installation of Aerodynamic Heavy Duty Truck Trailers  

SciTech Connect (OSTI)

The purpose of DE-EE0001552 was to develop and deploy a combination of trailer aerodynamic devices and low rolling resistance tires that reduce fuel consumption of a class 8 heavy duty tractor-trailer combination vehicle by 15%. There were 3 phases of the project: Phase 1 – Perform SAE Typed 2 track tests with multiple device combinations. Phase 2 – Conduct a fleet evaluation with selected device combination. Phase 3 – Develop the devices required to manufacture the aerodynamic trailer. All 3 phases have been completed. There is an abundance of available trailer devices on the market, and fleets and owner operators have awareness of them and are purchasing them. The products developed in conjunction with this project are at least in their second round of refinement. The fleet test undertaken showed an improvement of 5.5 – 7.8% fuel economy with the devices (This does not include tire contribution).

Beck, Jason; Salari, Kambiz; Ortega, Jason; Brown, Andrea

2013-09-30T23:59:59.000Z

24

Battery Ownership Model: A Tool for Evaluating the Economics of Electrified Vehicles and Related Infrastructure (Presentation)  

SciTech Connect (OSTI)

This presentation uses a vehicle simulator and economics model called the Battery Ownership Model to examine the levelized cost per mile of conventional (CV) and hybrid electric vehicles (HEVs) in comparison with the cost to operate an electric vehicle (EV) under a service provider business model. The service provider is assumed to provide EV infrastructure such as charge points and swap stations to allow an EV with a 100-mile range to operate with driving profiles equivalent to CVs and HEVs. Battery cost, fuel price forecast, battery life, and other variables are examined to determine under what scenarios the levelized cost of an EV with a service provider can approach that of a CV. Scenarios in both the United States as an average and Hawaii are examined. The levelized cost of operating an EV with a service provider under average U.S. conditions is approximately twice the cost of operating a small CV. If battery cost and life can be improved, in this study the cost of an EV drops to under 1.5 times the cost of a CV for U.S. average conditions. In Hawaii, the same EV is only slightly more expensive to operate than a CV.

O'Keefe, M.; Brooker, A.; Johnson, C.; Mendelsohn, M.; Neubauer, J.; Pesaran, A.

2010-11-01T23:59:59.000Z

25

NREL UL Fuel Dispensing Infrastructure Intermediate Blends Performance Testing (Presentation)  

SciTech Connect (OSTI)

Presentation provides an overview of NREL's project to determine compatibility and safe performance of installed fuel dispensing infrastructure with E15.

Moriarty, K.; Clark, W.

2011-01-01T23:59:59.000Z

26

Social infrastructure  

E-Print Network [OSTI]

Current urbanization patterns and aging transportation infrastructures have marginalized millions of US citizens. The result is that 4 .5 million US residents live within 100 meters of a four-lane highway' and have become ...

Kurlbaum, Ryan E. (Ryan Edward)

2013-01-01T23:59:59.000Z

27

Developing State and National Evaluation Infrastructures- Guidance for the Challenges and Opportunities of EM&V  

SciTech Connect (OSTI)

Evaluating the impacts and effectiveness of energy efficiency programs is likely to become increasingly important for state policymakers and program administrators given legislative mandates and regulatory goals and increasing reliance on energy efficiency as a resource. In this paper, we summarize three activities that the authors have conducted that highlight the expanded role of evaluation, measurement and verification (EM&V): a study that identified and analyzed challenges in improving and scaling up EM&V activities; a scoping study that identified issues involved in developing a national efficiency EM&V standard; and lessons learned from providing technical assistance on EM&V issues to states that are ramping up energy efficiency programs. The lessons learned are summarized in 13 EM&V issues that policy makers should address in each jurisdiction and which are listed and briefly described. The paper also discusses how improving the effectiveness and reliability of EM&V will require additional capacity building, better access to existing EM&V resources, new methods to address emerging issues and technologies, and perhaps foundational documents and approaches to improving the credibility and cross jurisdictional comparability of efficiency investments. Two of the potential foundational documents discussed are a national EM&V standard or resource guide and regional deemed savings and algorithm databases.

Schiller, Steven R.; Goldman, Charles A.

2011-06-24T23:59:59.000Z

28

Green Infrastructure  

E-Print Network [OSTI]

SWM, Green Buildings, Energy Forum, Texas Smartscape) ? Deteriorating Roadways ? ASCE Report Card on Texas Infrastructure for 2008 identified roads as the #1 infrastructure concern ? Congestion ? DFW congestion is growing over 45% faster than... the national average (TTI) ? Crowded existing ROW ? utilities, pavement, sidewalk, parkway, etc. - with little room for widening Sustainable Public Rights of Way Subcommittee ? Subcommittee reports to the PWC ? Consists of PWC and other major interests...

Tildwell, J.

2011-01-01T23:59:59.000Z

29

Energy Infrastructure Events and Expansions Infrastructure Security...  

Broader source: Energy.gov (indexed) [DOE]

Year-in-Review: 2010 Energy Infrastructure Events and Expansions Infrastructure Security and Energy Restoration Office of Electricity Delivery and Energy Reliability U.S....

30

Modeling hydrogen fuel distribution infrastructure  

E-Print Network [OSTI]

This thesis' fundamental research question is to evaluate the structure of the hydrogen production, distribution, and dispensing infrastructure under various scenarios and to discover if any trends become apparent after ...

Pulido, Jon R. (Jon Ramon), 1974-

2004-01-01T23:59:59.000Z

31

Evaluation of the utility and energy monitoring and control system installed at the US Army, Europe, 409th Base Support Battalion, Military Community at Grafenwoehr, Germany  

SciTech Connect (OSTI)

Under the provisions of Interagency Agreement DOE 1938-B090-A1 between the US Department of Energy (DOE) and the US Army Europe (USAREUR), Martin Marietta Energy Systems, Inc., is providing technical assistance to USAREUR in the areas of computer science, information engineering, energy studies, and engineering and systems development. One of the initial projects authorized under this interagency agreement is the evaluation of utility and energy monitoring and control systems (UEMCSs) installed at selected US Army installations in Europe. This report is an evaluation of the overall energy-conservation effectiveness and use of the UEMCS at the 409th Base Support Battalion located in Grafenwoehr, Germany. The 409th Base Support Battalion is a large USAREUR military training facility that comprises a large training area, leased housing, the main post area, and the camp areas that include Camps Aachen, Algier, Normandy, Cheb, and Kasserine. All of these facilities are consumers of electrical and thermal energy. However, only buildings and facilities in the main post area and Camps Aachen, Algier, and Normandy are under the control of the UEMCS. The focus of this evaluation report is on these specific areas. Recommendations to further increase energy and cost savings and to improve operation of the UEMCS are proposed.

Broders, M.A.; Ruppel, F.R.

1993-05-01T23:59:59.000Z

32

NREL UL E15 Fuel Dispensing Infrastructure Intermediate Blends Performance Testing (Presentation)  

SciTech Connect (OSTI)

Presentation provides an overview of NREL's project to determine compatibility and safe performance of installed fuel dispensing infrastructure with E15.

Moriarty, K.; Clark, W.

2011-02-01T23:59:59.000Z

33

Environmental Risks to Infrastructure 2014 Environmental Risks to Infrastructure Innovation funding call June 2014  

E-Print Network [OSTI]

to Infrastructure 2014 NE/M008401/1 Dr Christian Wagner Towards managing risk from climate change throughRUM - Flood risk: Building Infrastructure Resilience through better Understanding and Management choices 8 2 To Infrastructure (CAVERTI) 7 8 NE/M008169/1 Dr Ana Mijic Improved techno-economic evaluation of Blue Green

Reece, Sarah

34

RESEARCH INFRASTRUCTURES Roadmap 2008  

E-Print Network [OSTI]

RESEARCH INFRASTRUCTURES FOR FRANCE Roadmap 2008 #12;INTRODUCTION European research infrastructures and development, benefiting to Europe's economy and competitiveness. This roadmap for the research infrastructures....................................................................................................6 3. The roadmap: existing and already decided RIs and others at the planning stage

Horn, David

35

Monitoring Infrastructure Capacity Monitoring Infrastructure Capacity  

E-Print Network [OSTI]

Levinson, D. (2000) Monitoring Infrastructure Capacity p. 165-181 in Land Market Monitoring for Smart Urban) task. Monitoring infrastructure capacity is at least as complex as monitoring urban land markets Levinson, D. (2000) Monitoring Infrastructure Capacity p. 165-181 in Land Market Monitoring for Smart Urban

Levinson, David M.

36

Hydrogen and Infrastructure Costs  

Broader source: Energy.gov (indexed) [DOE]

FUEL CELL TECHNOLOGIES PROGRAM Hydrogen and Infrastructure Costs Hydrogen Infrastructure Market Readiness Workshop Washington D.C. February 17, 2011 Fred Joseck U.S. Department of...

37

Infrastructure Institutional Change Principle  

Broader source: Energy.gov [DOE]

Research shows that changes in infrastructure prompt changes in behavior (for better or worse). Federal agencies can modify their infrastructure to promote sustainability-oriented behavior change,...

38

Developer Installed Treatment Plants  

E-Print Network [OSTI]

-installed treatment plants. These treatment plants are more commonly known as package wastewater treatment plants. 1

unknown authors

2008-01-01T23:59:59.000Z

39

Impact evaluation of the energy retrofits installed in the Margolis high-rise apartment building, Chelsea housing authority  

SciTech Connect (OSTI)

As part of a joint demonstration effort involving HUD, DOE, a local public housing authority and Boston Edison, an evaluation of energy and demand saving retrofits was conducted for a tall, residential, low-income building located in Boston. The thirteen story building underwent window, lighting, and heating system control renovations in December, 1992. The success of these retrofits was determined using monthly and hourly whole-building consumption data along with a calibrated DOE-2.1D energy simulation model. According to the model developed, post-retrofit conditions showed reductions in annual energy consumption of 325 MWh and in peak demand of 100 kW. These savings resulted in an annual energy cost savings of $28,000. Over 90% of energy and cost savings were attributed to the window retrofit. Interaction of the reduction in lighting capacity with the building`s electric resistance heating system reduced the potential for energy and demand savings associated with the lighting retrofit. Results from the hourly simulation model also indicate that night setbacks controlled by the energy management system were not implemented. An additional 32 MWh in energy savings could be obtained by bringing this system on-line, however peak demand would be increased by 40 kW as the morning demand for space heat is increased, with a net loss in cost savings of $2,500.

Abraham, M.M.; McLain, H.A.; MacDonald, J.M.

1995-03-01T23:59:59.000Z

40

California Hydrogen Infrastructure Project  

SciTech Connect (OSTI)

Air Products and Chemicals, Inc. has completed a comprehensive, multiyear project to demonstrate a hydrogen infrastructure in California. The specific primary objective of the project was to demonstrate a model of a ���¢��������real-world���¢������� retail hydrogen infrastructure and acquire sufficient data within the project to assess the feasibility of achieving the nation���¢��������s hydrogen infrastructure goals. The project helped to advance hydrogen station technology, including the vehicle-to-station fueling interface, through consumer experiences and feedback. By encompassing a variety of fuel cell vehicles, customer profiles and fueling experiences, this project was able to obtain a complete portrait of real market needs. The project also opened its stations to other qualified vehicle providers at the appropriate time to promote widespread use and gain even broader public understanding of a hydrogen infrastructure. The project engaged major energy companies to provide a fueling experience similar to traditional gasoline station sites to foster public acceptance of hydrogen. Work over the course of the project was focused in multiple areas. With respect to the equipment needed, technical design specifications (including both safety and operational considerations) were written, reviewed, and finalized. After finalizing individual equipment designs, complete station designs were started including process flow diagrams and systems safety reviews. Material quotes were obtained, and in some cases, depending on the project status and the lead time, equipment was placed on order and fabrication began. Consideration was given for expected vehicle usage and station capacity, standard features needed, and the ability to upgrade the station at a later date. In parallel with work on the equipment, discussions were started with various vehicle manufacturers to identify vehicle demand (short- and long-term needs). Discussions included identifying potential areas most suited for hydrogen fueling stations with a focus on safe, convenient, fast-fills. These potential areas were then compared to and overlaid with suitable sites from various energy companies and other potential station operators. Work continues to match vehicle needs with suitable fueling station locations. Once a specific site was identified, the necessary agreements could be completed with the station operator and expected station users. Detailed work could then begin on the site drawings, permits, safety procedures and training needs. Permanent stations were successfully installed in Irvine (delivered liquid hydrogen), Torrance (delivered pipeline hydrogen) and Fountain Valley (renewable hydrogen from anaerobic digester gas). Mobile fueling stations were also deployed to meet short-term fueling needs in Long Beach and Placerville. Once these stations were brought online, infrastructure data was collected and reported to DOE using Air Products���¢�������� Enterprise Remote Access Monitoring system. Feedback from station operators was incorporated to improve the station user���¢��������s fueling experience.

Edward C. Heydorn

2013-03-12T23:59:59.000Z

Note: This page contains sample records for the topic "infrastructure evaluation installation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Interdependence of Electricity System Infrastructure and Natural...  

Broader source: Energy.gov (indexed) [DOE]

Interdependence of Electricity System Infrastructure and Natural Gas Infrastructure - EAC 2011 Interdependence of Electricity System Infrastructure and Natural Gas Infrastructure -...

42

INFRASTRUCTURE SECURITY & ENERGY  

E-Print Network [OSTI]

price monitoring #12;INFRASTRUCTURE SECURITY & ENERGY RESTORATION OFFICE of ELECTRICITY DELIVERYINFRASTRUCTURE SECURITY & ENERGY RESTORATION OFFICE of ELECTRICITY DELIVERY & ENERGY RELIABILITY Real Time Monitoring of Energy Infrastructure Status Patrick Willging, PE Office of Electricity

Schrijver, Karel

43

National Environmental Information Infrastructure  

E-Print Network [OSTI]

National Environmental Information Infrastructure: Reference Architecture Contributing Information Infrastructure: Reference Architecture v1.1 Environmental Information Programme Publication Series: Reference Architecture, Environmental Information Programme Publication Series, document no. 4, Bureau

Greenslade, Diana

44

Energy Transmission and Infrastructure  

SciTech Connect (OSTI)

The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: • improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; • identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); • analyze the potential within the district to utilize farm wastes to produce biofuels; • enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; • identify the policy, regulatory, and financial barriers impeding development of a new energy system; and • improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the College’s yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

Mathison, Jane

2012-12-31T23:59:59.000Z

45

Public Works Transportation Infrastructure Study  

E-Print Network [OSTI]

Public Works Transportation Infrastructure Study Minneapolis City of Lakes Minneapolis Public Works Transportation Infrastructure Study #12;Public Works Transportation Infrastructure Study Minneapolis City Works Transportation Infrastructure Study Minneapolis City of Lakes Background: · Currently, funding

Minnesota, University of

46

Parallel digital forensics infrastructure.  

SciTech Connect (OSTI)

This report documents the architecture and implementation of a Parallel Digital Forensics infrastructure. This infrastructure is necessary for supporting the design, implementation, and testing of new classes of parallel digital forensics tools. Digital Forensics has become extremely difficult with data sets of one terabyte and larger. The only way to overcome the processing time of these large sets is to identify and develop new parallel algorithms for performing the analysis. To support algorithm research, a flexible base infrastructure is required. A candidate architecture for this base infrastructure was designed, instantiated, and tested by this project, in collaboration with New Mexico Tech. Previous infrastructures were not designed and built specifically for the development and testing of parallel algorithms. With the size of forensics data sets only expected to increase significantly, this type of infrastructure support is necessary for continued research in parallel digital forensics. This report documents the implementation of the parallel digital forensics (PDF) infrastructure architecture and implementation.

Liebrock, Lorie M. (New Mexico Tech, Socorro, NM); Duggan, David Patrick

2009-10-01T23:59:59.000Z

47

Photovoltaic Installations at Williams College Ruth Aronoff  

E-Print Network [OSTI]

generation using solar power. Photovoltaic (PV) panel installations are a simple way for the College facilities, it is now evaluating in detail the environmental impact of these actions. In addition to making1 Photovoltaic Installations at Williams College Ruth Aronoff Williams Luce Project SUMMARY

Aalberts, Daniel P.

48

Offshore petroleum security: Analysis of offshore security threats, target attractiveness, and the international legal framework for the protection and security of offshore petroleum installations.  

E-Print Network [OSTI]

??The offshore petroleum industry is of critical importance to the global economy. Offshore petroleum installations are considered elements of critical national infrastructure in many nation-States… (more)

Kashubsky, Mikhail

2011-01-01T23:59:59.000Z

49

Installation and Acceptance Stage  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter addresses activities required to install the software, data bases, or data that comprise the software product onto the hardware platform at sites of operation.

1997-05-21T23:59:59.000Z

50

Hydrogen Transition Infrastructure Analysis  

SciTech Connect (OSTI)

Presentation for the 2005 U.S. Department of Energy Hydrogen Program review analyzes the hydrogen infrastructure needed to accommodate a transitional hydrogen fuel cell vehicle demand.

Melendez, M.; Milbrandt, A.

2005-05-01T23:59:59.000Z

51

HYDROGEN REGIONAL INFRASTRUCTURE PROGRAM  

E-Print Network [OSTI]

to serve as "go-to" organization to catalyze PA Hydrogen and Fuel Cell Economy development #12;FundingHYDROGEN REGIONAL INFRASTRUCTURE PROGRAM IN PENNSYLVANIA HYDROGEN REGIONAL INFRASTRUCTURE PROGRAM IN PENNSYLVANIA Melissa Klingenberg, PhDMelissa Klingenberg, PhD #12;Hydrogen ProgramHydrogen Program Air Products

52

ENERGY EFFICIENT INTERNET INFRASTRUCTURE  

E-Print Network [OSTI]

. D R A F T October 27, 2010, 11:34pm D R A F T #12;2 ENERGY EFFICIENT INTERNET INFRASTRUCTURE FigureCHAPTER 1 ENERGY EFFICIENT INTERNET INFRASTRUCTURE Weirong Jiang, Ph.D.1 , and Viktor K. Prasanna]. In other words, an IP address may match multiple prefixes, but only the longest D R A F T October 27, 2010

Prasanna, Viktor K.

53

Global Infrastructures Abstract/Summary  

E-Print Network [OSTI]

facilities, electricity supply, state of the physical building etc. The socioeconomic and geopolitical in large hospitals (and other corporate infrastructures) and infrastructures supporting the governance the practical development of infrastructures supporting the governance of the health care sector in developing

Sahay, Sundeep

54

Client Configuration and Installation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Instructions below. In certain environments (e.g., if your installation is on a machine which has more than one network interface or has a high bandwidth network connection...

55

HVAC Installed Performance  

Broader source: Energy.gov [DOE]

This presentation was given at the Summer 2012 DOE Building America meeting on July 25, 2012, and addressed the question ŤHVAC proper installation energy savings: over-promising or under-delivering?"

56

Arduino Tool: For Interactive Artwork Installations  

E-Print Network [OSTI]

The emergence of the digital media and computational tools has widened the doors for creativity. The cutting edge in the digital arts and role of new technologies can be explored for the possible creativity. This gives an opportunity to involve arts with technologies to make creative works. The interactive artworks are often installed in the places where multiple people can interact with the installation, which allows the art to achieve its purpose by allowing the people to observe and involve with the installation. The level of engagement of the audience depends on the various factors such as aesthetic satisfaction, how the audience constructs meaning, pleasure and enjoyment. The method to evaluate these experiences is challenging as it depends on integration between the artificial life and real life by means of human computer interaction. This research investigates "How Adriano fits for creative and interactive artwork installations?" using an artwork installation in the campus of NTNU (Norwegian University...

Shaikh, Murtaza Hussain

2012-01-01T23:59:59.000Z

57

Green Infrastructure Bonds (Hawaii)  

Broader source: Energy.gov [DOE]

In July 2013, Hawaii enacted legislation allowing the Department of Business, Economic Development, and Tourism to issue Green Infrastructure Bonds to secture low-cost financing for clean energy...

58

IPHE Infrastructure Workshop Proceedings  

Fuel Cell Technologies Publication and Product Library (EERE)

This proceedings contains information from the IPHE Infrastructure Workshop, a two-day interactive workshop held on February 25-26, 2010, to explore the market implementation needs for hydrogen fuelin

59

Infrastructure Ecology for Sustainable and Resilient Urban Infrastructure Design  

SciTech Connect (OSTI)

The population growth coupled with increasing urbanization is predicted to exert a huge demand on the growth and retrofit of urban infrastructure, particularly in water and energy systems. The U.S. population is estimated to grow by 23% (UN, 2009) between 2005 and 2030. The corresponding increases in energy and water demand were predicted as 14% (EIA, 2009) and 20% (Elcock, 2008), respectively. The water-energy nexus needs to be better understood to satisfy the increased demand in a sustainable manner without conflicting with environmental and economic constraints. Overall, 4% of U.S. power generation is used for water distribution (80%) and treatment (20%). 3% of U.S. water consumption (100 billion gallons per day, or 100 BGD) and 40% of U.S. water withdrawal (340 BGD) are for thermoelectric power generation (Goldstein and Smith, 2002). The water demand for energy production is predicted to increase most significantly among the water consumption sectors by 2030. On the other hand, due to the dearth of conventional water sources, energy intensive technologies are increasingly in use to treat seawater and brackish groundwater for water supply. Thus comprehending the interrelation and interdependency between water and energy system is imperative to evaluate sustainable water and energy supply alternatives for cities. In addition to the water-energy nexus, decentralized or distributed concept is also beneficial for designing sustainable water and energy infrastructure as these alternatives require lesser distribution lines and space in a compact urban area. Especially, the distributed energy infrastructure is more suited to interconnect various large and small scale renewable energy producers which can be expected to mitigate greenhouse gas (GHG) emissions. In the case of decentralized water infrastructure, on-site wastewater treatment facility can provide multiple benefits. Firstly, it reduces the potable water demand by reusing the treated water for non-potable uses and secondly, it also reduces the wastewater load to central facility. In addition, lesser dependency on the distribution network contributes to increased reliability and resiliency of the infrastructure. The goal of this research is to develop a framework which seeks an optimal combination of decentralized water and energy alternatives and centralized infrastructures based on physical and socio-economic environments of a region. Centralized and decentralized options related to water, wastewater and stormwater and distributed energy alternatives including photovoltaic (PV) generators, fuel cells and microturbines are investigated. In the context of the water-energy nexus, water recovery from energy alternatives and energy recovery from water alternatives are reflected. Alternatives recapturing nutrients from wastewater are also considered to conserve depleting resources. The alternatives are evaluated in terms of their life-cycle environmental impact and economic performance using a hybrid life cycle assessment (LCA) tool and cost benefit analysis, respectively. Meeting the increasing demand of a test bed, an optimal combination of the alternatives is designed to minimize environmental and economic impacts including CO2 emissions, human health risk, natural resource use, and construction and operation cost. The framework determines the optimal combination depending on urban density, transmission or conveyance distance or network, geology, climate, etc. Therefore, it will be also able to evaluate infrastructure resiliency against physical and socio-economic challenges such as population growth, severe weather, energy and water shortage, economic crisis, and so on.

Jeong, Hyunju [Georgia Institute of Technology; Pandit, Arka [Georgia Institute of Technology; Crittenden, John [Georgia Institute of Technology; Xu, Ming [University of Michigan; Perrings, Charles [Arizona State University; Wang, Dali [ORNL; Li, Ke [University of Georgia; French, Steve [Georgia Institute of Technology

2010-10-01T23:59:59.000Z

60

Building safeguards infrastructure  

SciTech Connect (OSTI)

Much has been written in recent years about the nuclear renaissance - the rebirth of nuclear power as a clean and safe source of electricity around the world. Those who question the nuclear renaissance often cite the risk of proliferation, accidents or an attack on a facility as concerns, all of which merit serious consideration. The integration of these three areas - sometimes referred to as 3S, for safety, security and safeguards - is essential to supporting the growth of nuclear power, and the infrastructure that supports them should be strengthened. The focus of this paper will be on the role safeguards plays in the 3S concept and how to support the development of the infrastructure necessary to support safeguards. The objective of this paper has been to provide a working definition of safeguards infrastructure, and to discuss xamples of how building safeguards infrastructure is presented in several models. The guidelines outlined in the milestones document provide a clear path for establishing both the safeguards and the related infrastructures needed to support the development of nuclear power. The model employed by the INSEP program of engaging with partner states on safeguards-related topics that are of current interest to the level of nuclear development in that state provides another way of approaching the concept of building safeguards infrastructure. The Next Generation Safeguards Initiative is yet another approach that underscored five principal areas for growth, and the United States commitment to working with partners to promote this growth both at home and abroad.

Stevens, Rebecca S [Los Alamos National Laboratory; Mcclelland - Kerr, John [NNSA/NA-242

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "infrastructure evaluation installation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

MFC Communications Infrastructure Study  

SciTech Connect (OSTI)

Unprecedented growth of required telecommunications services and telecommunications applications change the way the INL does business today. High speed connectivity compiled with a high demand for telephony and network services requires a robust communications infrastructure.   The current state of the MFC communication infrastructure limits growth opportunities of current and future communication infrastructure services. This limitation is largely due to equipment capacity issues, aging cabling infrastructure (external/internal fiber and copper cable) and inadequate space for telecommunication equipment. While some communication infrastructure improvements have been implemented over time projects, it has been completed without a clear overall plan and technology standard.   This document identifies critical deficiencies with the current state of the communication infrastructure in operation at the MFC facilities and provides an analysis to identify needs and deficiencies to be addressed in order to achieve target architectural standards as defined in STD-170. The intent of STD-170 is to provide a robust, flexible, long-term solution to make communications capabilities align with the INL mission and fit the various programmatic growth and expansion needs.

Michael Cannon; Terry Barney; Gary Cook; George Danklefsen, Jr.; Paul Fairbourn; Susan Gihring; Lisa Stearns

2012-01-01T23:59:59.000Z

62

Clean Energy Infrastructure Educational Initiative  

SciTech Connect (OSTI)

The Clean Energy Infrastructure Educational Initiative represents a collaborative effort by the University of Dayton, Wright State University and Sinclair Community College. This effort above all aimed to establish energy related programs at each of the universities while also providing outreach to the local, state-wide, and national communities. At the University of Dayton, the grant has aimed at: solidfying a newly created Masterâ??s program in Renewable and Clean Energy; helping to establish and staff a regional sustainability organization for SW Ohio. As well, as the prime grantee, the University of Dayton was responsible for insuring curricular sharing between WSU and the University of Dayton. Finally, the grant, through its support of graduate students, and through cooperation with the largest utilities in SW Ohio enabled a region-wide evaluation of over 10,000 commercial building buildings in order to identify the priority buildings in the region for energy reduction. In each, the grant has achieved success. The main focus of Wright State was to continue the development of graduate education in renewable and clean energy. Wright State has done this in a number of ways. First and foremost this was done by continuing the development of the new Renewable and Clean Energy Masterâ??s Degree program at Wright State . Development tasks included: continuing development of courses for the Renewable and Clean Energy Masterâ??s Degree, increasing the student enrollment, and increasing renewable and clean energy research work. The grant has enabled development and/or improvement of 7 courses. Collectively, the University of Dayton and WSU offer perhaps the most comprehensive list of courses in the renewable and clean energy area in the country. Because of this development, enrollment at WSU has increased from 4 students to 23. Secondly, the grant has helped to support student research aimed in the renewable and clean energy program. The grant helped to solidify new research in the renewable and clean energy area. The educational outreach provided as a result of the grant included activities to introduce renewable and clean energy design projects into the Mechanical and Materials Engineering senior design class, the development of a geothermal energy demonstration unit, and the development of renewable energy learning modules for high school students. Finally, this grant supported curriculum development by Sinclair Community College for seven new courses and acquisition of necessary related instrumentation and laboratory equipment. These new courses, EGV 1201 Weatherization Training, EGV 1251 Introduction to Energy Management Principles, EGV 2301 Commercial and Industrial Assessment, EGV 2351 LEED Green Associate Exam Preparation, EGV 2251 Energy Control Strategies, EGV Solar Photovoltaic Design and Installation, and EGV Solar Thermal Systems, enable Sinclair to offer complete Energy Technology Certificate and an Energy Management Degree programs. To date, 151 students have completed or are currently registered in one of the seven courses developed through this grant. With the increasing interest in the Energy Management Degree program, Sinclair has begun the procedure to have the program approved by the Ohio Board of Regents.

Hallinan, Kevin; Menart, James; Gilbert, Robert

2012-08-31T23:59:59.000Z

63

Reviewing Post-Installation and Annual Reports for Federal ESPC...  

Broader source: Energy.gov (indexed) [DOE]

reviews of post-installation and annual reports for federal ESPC projects. These procedures will allow for consistent evaluations of performance reports, produce...

64

Hydrogen Fueling Systems and Infrastructure  

E-Print Network [OSTI]

Infrastructure Development TIAX Sunline LAX, Praxair · Fuels Choice · Renewable Energy Transportation System

65

VAX/ASPEN installation guide  

SciTech Connect (OSTI)

Information necessary to install the ASPEN computerized simulation program on the VAX system is provided.

Williams, K.E.

1984-11-01T23:59:59.000Z

66

Sandia National Laboratories: Installation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -theErik Spoerke SSLS Exhibit atVehicleEnergy Infrastructure On November

67

COLLEGE OF ENGINEERING Infrastructure  

E-Print Network [OSTI]

solar energy (8). ME Ketul Popat and John Williams in the Department of Mechanical EngineeringCOLLEGE OF ENGINEERING Infrastructure #12;2 COLLEGE OF ENGINEERING This publication focuses on just a few of the incredible College of Engineering faculty and students who are conducting research related

68

Infrastructure Assurance Center  

E-Print Network [OSTI]

, the United States relied on natural gas to meet about 22% of its energy needs. Therefore, assuring efficient, natural gas processing plants, and other industrial customers, along with the changes in the utilizationInfrastructure Assurance Center NGReal-time: processing and analysis tool for natural gas delivery

69

Validating the Estimated Cost of Saving Water Through Infrastructure Rehabilitation in the Texas Lower Rio Grande Valley  

E-Print Network [OSTI]

Irrigation District No. 2 (San Juan) – 48" Pipeline Replacing Wisconsin Canal – Final.” Subsequent to that report's release, the project was installed and implemented within the District’s water-delivery infrastructure system, with actual construction costs...

Sturdivant, A. W.; Rister, M.; Lacewell, R. D.

70

In Situ Nuclear Characterization Infrastructure  

SciTech Connect (OSTI)

To be able to evolve microstructure with a prescribed in situ process, an effective measurement infrastructure must exist. This interdisciplinary infrastructure needs to be developed in parallel with in situ sensor technology. This paper discusses the essential elements in an effective infrastructure.

James A. Smith; J. Rory Kennedy

2011-11-01T23:59:59.000Z

71

Controlled Hydrogen Fleet and Infrastructure Demonstration and...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project Solicitation Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project...

72

International Hydrogen Infrastructure Challenges Workshop Summary...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

International Hydrogen Infrastructure Challenges Workshop Summary - NOW, NEDO, and DOE International Hydrogen Infrastructure Challenges Workshop Summary - NOW, NEDO, and DOE...

73

Upcoming Webinar December 16: International Hydrogen Infrastructure...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Upcoming Webinar December 16: International Hydrogen Infrastructure Challenges NOW, DOE, and NEDO Upcoming Webinar December 16: International Hydrogen Infrastructure Challenges...

74

Costs Associated With Compressed Natural Gas Vehicle Fueling Infrastructure  

SciTech Connect (OSTI)

This document is designed to help fleets understand the cost factors associated with fueling infrastructure for compressed natural gas (CNG) vehicles. It provides estimated cost ranges for various sizes and types of CNG fueling stations and an overview of factors that contribute to the total cost of an installed station. The information presented is based on input from professionals in the natural gas industry who design, sell equipment for, and/or own and operate CNG stations.

Smith, M.; Gonzales, J.

2014-09-01T23:59:59.000Z

75

Smarter Physical Infrastructure  

E-Print Network [OSTI]

Building Operations, Montreal, Quebec, October 8-11, 2013 Bending the Spoon ESL-IC-13-10-57 Proceedings of the 13th International Conference for Enhanced Building Operations, Montreal, Quebec, October 8-11, 2013 Data Points ESL-IC-13-10-57 Proceedings... of the 13th International Conference for Enhanced Building Operations, Montreal, Quebec, October 8-11, 2013 IT Enablers for Physical Infrastructure ?M2M ?IOT ?Big Data ?Mobility ?Cloud ESL-IC-13-10-57 Proceedings of the 13th International Conference...

Bartlett, D.

2013-01-01T23:59:59.000Z

76

Infrastructure Projects | Jefferson Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFunInfrared Land Surface Emissivity in the Vicinity of theInfrastructure Projects

77

Sandia National Laboratories: Infrastructure  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive SolarEducationStation Technology InfrastructureIEEEVideoSAR Sandia

78

Sandia National Laboratories: Infrastructure  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -theErik Spoerke SSLS Exhibit atVehicle TechnologiesImproved PowerInfrastructure

79

Forecourt and Gas Infrastructure Optimization  

Broader source: Energy.gov (indexed) [DOE]

Forecourt and Gas Infrastructure Optimization Bruce Kelly Nexant, Inc. Hydrogen Delivery Analysis Meeting May 8-9, 2007 Columbia, Maryland 2 Analysis of Market Demand and Supply...

80

Fluxnet Synthesis Dataset Collaboration Infrastructure  

E-Print Network [OSTI]

Fluxnet Synthesis Dataset Collaboration Infrastructure DebUCB) The Fluxnet synthesis dataset originally compiled forhave been added and the dataset now contains over 920 site

Agarwal, Deborah A.

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "infrastructure evaluation installation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Innovative Financing for Green Infrastructure  

Office of Energy Efficiency and Renewable Energy (EERE)

Topic OverviewFinancing green infrastructure is critical to taking projects from planning to implementation and beyond, including sustaining operations and maintenance. This 90-minute webcast will...

82

Computational Infrastructure for Nuclear Astrophysics  

SciTech Connect (OSTI)

A Computational Infrastructure for Nuclear Astrophysics has been developed to streamline the inclusion of the latest nuclear physics data in astrophysics simulations. The infrastructure consists of a platform-independent suite of computer codes that is freely available online at nucastrodata.org. Features of, and future plans for, this software suite are given.

Smith, Michael S.; Hix, W. Raphael; Bardayan, Daniel W.; Blackmon, Jeffery C. [Physics Division, Oak Ridge National Laboratory, Oak Ridge, TN, 37831-6354 (United States); Lingerfelt, Eric J.; Scott, Jason P.; Nesaraja, Caroline D. [Physics Division, Oak Ridge National Laboratory, Oak Ridge, TN, 37831-6354 (United States); Dept. Physics and Astronomy, Univ. of Tennessee, Knoxville, TN 37996-1200 (United States); Chae, Kyungyuk; Guidry, Michael W. [Dept. Physics and Astronomy, Univ. of Tennessee, Knoxville, TN 37996-1200 (United States); Physics Division, Oak Ridge National Laboratory, Oak Ridge, TN, 37831-6354 (United States); Koura, Hiroyuki [Japan Atomic Energy Agency, Tokai, Naka-gun, Ibaraki 319-1195 (Japan); Meyer, Richard A. [RAME' Inc., Teaticket, MA, 02536 (United States)

2006-07-12T23:59:59.000Z

83

Cyber and physical infrastructure interdependencies.  

SciTech Connect (OSTI)

The goal of the work discussed in this document is to understand the risk to the nation of cyber attacks on critical infrastructures. The large body of research results on cyber attacks against physical infrastructure vulnerabilities has not resulted in clear understanding of the cascading effects a cyber-caused disruption can have on critical national infrastructures and the ability of these affected infrastructures to deliver services. This document discusses current research and methodologies aimed at assessing the translation of a cyber-based effect into a physical disruption of infrastructure and thence into quantification of the economic consequences of the resultant disruption and damage. The document discusses the deficiencies of the existing methods in correlating cyber attacks with physical consequences. The document then outlines a research plan to correct those deficiencies. When completed, the research plan will result in a fully supported methodology to quantify the economic consequences of events that begin with cyber effects, cascade into other physical infrastructure impacts, and result in degradation of the critical infrastructure's ability to deliver services and products. This methodology enables quantification of the risks to national critical infrastructure of cyber threats. The work addresses the electric power sector as an example of how the methodology can be applied.

Phillips, Laurence R.; Kelic, Andjelka; Warren, Drake E.

2008-09-01T23:59:59.000Z

84

Towards Truly Ubiquitous and Opportunistic Trust Infrastructures: Position for Next Generation Cybersecurity Infrastructure Workshop  

E-Print Network [OSTI]

: Position for Next Generation Cybersecurity Infrastructure Workshop Stephen Nightingale Generation Cybersecurity Infrastructure workshop, we note that Federated Identities [1

Tennessee, University of

85

Refueling Infrastructure for Alternative Fuel Vehicles: Lessons...  

Broader source: Energy.gov (indexed) [DOE]

Refueling Infrastructure for Alternative Fuel Vehicles: Lessons Learned for Hydrogen Refueling Infrastructure for Alternative Fuel Vehicles: Lessons Learned for Hydrogen On April...

86

The Development Infrastructure Grant Program (Mississippi)  

Broader source: Energy.gov [DOE]

The Development Infrastructure Grant Program (DIP) is a grant program that is available to fund publicly owned infrastructure, including electricity generation and distribution. Funding from this...

87

California Low Carbon Fuels Infrastructure Investment Initiative...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Low Carbon Fuels Infrastructure Investment Initiative California Low Carbon Fuels Infrastructure Investment Initiative 2012 DOE Hydrogen and Fuel Cells Program and Vehicle...

88

Natural Gas and Hydrogen Infrastructure Opportunities: Markets...  

Broader source: Energy.gov (indexed) [DOE]

Natural Gas and Hydrogen Infrastructure Opportunities: Markets and Barriers to Growth Natural Gas and Hydrogen Infrastructure Opportunities: Markets and Barriers to Growth...

89

Natural Gas and Hydrogen Infrastructure Opportunities Workshop...  

Broader source: Energy.gov (indexed) [DOE]

Natural Gas and Hydrogen Infrastructure Opportunities Workshop Agenda Natural Gas and Hydrogen Infrastructure Opportunities Workshop Agenda Agenda for the Natural Gas and Hydrogen...

90

IPHE Infrastructure Workshop - Workshop Proceedings, February...  

Broader source: Energy.gov (indexed) [DOE]

IPHE Infrastructure Workshop - Workshop Proceedings, February 25-26, 2010 Sacramento, CA IPHE Infrastructure Workshop - Workshop Proceedings, February 25-26, 2010 Sacramento, CA...

91

Hydrogen Fueling Infrastructure Research and Station Technology...  

Energy Savers [EERE]

Infrastructure Research and Station Technology Download presentation slides from the DOE Fuel Cell Technologies Office webinar "An Overview of the Hydrogen Fueling Infrastructure...

92

Final Report - Hydrogen Delivery Infrastructure Options Analysis...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

- Hydrogen Delivery Infrastructure Options Analysis Final Report - Hydrogen Delivery Infrastructure Options Analysis This report, by the Nexant team, documents an in-depth analysis...

93

Hydrogen, Fuel Cells and Infrastructure Technologies Program...  

Broader source: Energy.gov (indexed) [DOE]

Hydrogen, Fuel Cells and Infrastructure Technologies Program: 2002 Annual Progress Report Hydrogen, Fuel Cells and Infrastructure Technologies Program: 2002 Annual Progress Report...

94

Hydrogen Vehicle and Infrastructure Demonstration and Validation...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Vehicle and Infrastructure Demonstration and Validation Hydrogen Vehicle and Infrastructure Demonstration and Validation 2009 DOE Hydrogen Program and Vehicle Technologies Program...

95

State Experience in Hydrogen Infrastructure in California  

Broader source: Energy.gov (indexed) [DOE]

Experience in Hydrogen Infrastructure in California Gerhard H Achtelik Jr. February 17, 2011 Hydrogen Infrastructure Market Readiness Workshop California Environmental Protection...

96

Magnet Girder Assembly and Installation  

ScienceCinema (OSTI)

It takes teamwork to assemble and install magnet girders for the storage ring of the National Synchrotron Light Source II. NSLS-II is now under construction at Brookhaven Lab.

None

2013-07-17T23:59:59.000Z

97

Solar Installation Labor Market Analysis  

SciTech Connect (OSTI)

The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

Friedman, B.; Jordan, P.; Carrese, J.

2011-12-01T23:59:59.000Z

98

Magnet Girder Assembly and Installation  

SciTech Connect (OSTI)

It takes teamwork to assemble and install magnet girders for the storage ring of the National Synchrotron Light Source II. NSLS-II is now under construction at Brookhaven Lab.

None

2012-12-12T23:59:59.000Z

99

Net Zero Energy Installations (Presentation)  

SciTech Connect (OSTI)

A net zero energy installation (NZEI) is one that produces as much energy from on-site renewable sources as it consumes. NZEI assessment provides a systematic approach to energy projects.

Booth, S.

2012-05-01T23:59:59.000Z

100

Degree design of coupled infrastructures  

E-Print Network [OSTI]

A recent asymptotic model of cascading failure in two-domain, coupled infrastructures is used to pose and solve a specific degree-distribution design problem. Low-order non-linear analysis exposes the mechanisms by which ...

Hover, Franz S.

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "infrastructure evaluation installation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Sustainable Stanford Greening Infrastructure & Choices  

E-Print Network [OSTI]

sustainability coordinators Work with Office of Sustainability as staff to assist and coordinate with building;1717 Building Level Conservation Solicit participation for the campus Building Level Sustainability Program #12Sustainable Stanford Greening Infrastructure & Choices Fahmida Ahmed Office of Sustainability #12

102

Hydrogen Delivery Infrastructure Options Analysis  

Fuel Cell Technologies Publication and Product Library (EERE)

This report, by the Nexant team, documents an in-depth analysis of seven hydrogen delivery options to identify the most cost-effective hydrogen infrastructure for the transition and long term. The pro

103

Securing Offshore Infrastructures Through a Global Alert and Graded Response System  

E-Print Network [OSTI]

1 « SARGOS » Securing Offshore Infrastructures Through a Global Alert and Graded Response System and graded response system to answer the recent but strong need for securing critical civilian offshore of their 2009 global safety program (CSOSG). 1. Introduction Offshore oil installations are critical energy

Paris-Sud XI, Université de

104

Data Mining using Python --exercises for installation  

E-Print Network [OSTI]

ipython (e.g., by pip) Start with: ipython -pylab Once installed make sure you can write: In [1]: plot for installation Install IPython Notebook Check that you can run a IPython Notebook file. Test that the IPython

105

Transportation and its Infrastructure  

E-Print Network [OSTI]

Evaluation of Hybrid Diesel-Electric Transit Buses - Finalof braking energy in diesel-electric vehicles (see the webCNG buses, hybrid diesel-electric buses and taxi renovation)

2007-01-01T23:59:59.000Z

106

2012 Annual Report Research Reactor Infrastructure Program  

SciTech Connect (OSTI)

The content of this report is the 2012 Annual Report for the Research Reactor Infrastructure Program.

Douglas Morrell

2012-11-01T23:59:59.000Z

107

Controlled Hydrogen Fleet and Infrastructure Analysis (Presentation)  

SciTech Connect (OSTI)

This presentation summarizes controlled hydrogen fleet & infrastructure analysis undertaken for the DOE Fuel Cell Technologies Program.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.

2010-06-10T23:59:59.000Z

108

CLOUD COMPUTING INFRASTRUCTURE AND OPERATIONS PROGRAM  

E-Print Network [OSTI]

CLOUD COMPUTING INFRASTRUCTURE AND OPERATIONS PROGRAM A six-week in-depth program in the architectures, infrastructure, and operations of Cloud Computing DePaul University's Cloud Computing Infrastructure and Operations Program provides specialized knowledge in Cloud infrastructure with emphasis

Schaefer, Marcus

109

E-Print Network 3.0 - avoid radar installations Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to 9o differences in flow directions. 1. INTRODUCTION We installed the first HF radar at Coal Oil... Evaluating radial component current measurements from CODAR high frequency...

110

Installation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFunInfrared Land Surface Emissivity inFermilabWhich1the research community

111

STATE OF CALIFORNIA INSTALLATION CERTIFICATE  

E-Print Network [OSTI]

ENERGY COMMISSION INSTALLATION CERTIFICATE CF-6R-MECH-25-HERS Refrigerant Charge Verification ­ Standard to refrigerant charge verification for compliance, a MECH-24 Certificate (instead of this MECH-25 Certificate) should be used to demonstrate compliance with the refrigerant charge verification requirement. TMAH

112

STATE OF CALIFORNIA INSTALLATION CERTIFICATE  

E-Print Network [OSTI]

ENERGY COMMISSION INSTALLATION CERTIFICATE CF-6R-MECH-26-HERS Refrigerant Charge Verification ­ Alternate are specified in Reference Residential Appendix RA3.2. If refrigerant charge verification is requiredR-MECH-26-HERS Refrigerant Charge Verification ­ Alternate Measurement Procedure (Page 2 of 3) Site

113

USWRP funded the enabling infrastructure of HWT during FY13-14 as well as contributed to the development of a new decision support tool for severe weather warnings. HWT tests and evaluates new experimental products in  

E-Print Network [OSTI]

on human, surface transportation and aviation. The Fiscal Year (FY) 2015 President's Budget Request budget is $4.1M, the FY 2013 actual budget was $3.9M and the FY 2012 actual budget was $4.2M. USWUSWRP funded the enabling infrastructure of HWT during FY13-14 as well as contributed

114

A Knowledge Management Platform for Infrastructure Performance Modeling  

E-Print Network [OSTI]

Transportation Centers Program, in the interest of information exchange. The U.S. Government assumes no liability, utilization, evaluation and selection of performance models. Thus, the objective of the study is to build the capabilities of their own models. The platform advances infrastructure performance modeling because analysts

115

Controlled Hydrogen Fleet and Infrastructure Demonstration Project  

SciTech Connect (OSTI)

This program was undertaken in response to the US Department of Energy Solicitation DE-PS30-03GO93010, resulting in this Cooperative Agreement with the Ford Motor Company and BP to demonstrate and evaluate hydrogen fuel cell vehicles and required fueling infrastructure. Ford initially placed 18 hydrogen fuel cell vehicles (FCV) in three geographic regions of the US (Sacramento, CA; Orlando, FL; and southeast Michigan). Subsequently, 8 advanced technology vehicles were developed and evaluated by the Ford engineering team in Michigan. BP is Ford's principal partner and co-applicant on this project and provided the hydrogen infrastructure to support the fuel cell vehicles. BP ultimately provided three new fueling stations. The Ford-BP program consists of two overlapping phases. The deliverables of this project, combined with those of other industry consortia, are to be used to provide critical input to hydrogen economy commercialization decisions by 2015. The program's goal is to support industry efforts of the US President's Hydrogen Fuel Initiative in developing a path to a hydrogen economy. This program was designed to seek complete systems solutions to address hydrogen infrastructure and vehicle development, and possible synergies between hydrogen fuel electricity generation and transportation applications. This project, in support of that national goal, was designed to gain real world experience with Hydrogen powered Fuel Cell Vehicles (H2FCV) 'on the road' used in everyday activities, and further, to begin the development of the required supporting H2 infrastructure. Implementation of a new hydrogen vehicle technology is, as expected, complex because of the need for parallel introduction of a viable, available fuel delivery system and sufficient numbers of vehicles to buy fuel to justify expansion of the fueling infrastructure. Viability of the fuel structure means widespread, affordable hydrogen which can return a reasonable profit to the fuel provider, while viability of the vehicle requires an expected level of cost, comfort, safety and operation, especially driving range, that consumers require. This presents a classic 'chicken and egg' problem, which Ford believes can be solved with thoughtful implementation plans. The eighteen Ford Focus FCV vehicles that were operated for this demonstration project provided the desired real world experience. Some things worked better than expected. Most notable was the robustness and life of the fuel cell. This is thought to be the result of the full hybrid configuration of the drive system where the battery helps to overcome the performance reduction associated with time related fuel cell degradation. In addition, customer satisfaction surveys indicated that people like the cars and the concept and operated them with little hesitation. Although the demonstrated range of the cars was near 200 miles, operators felt constrained because of the lack of a number of conveniently located fueling stations. Overcoming this major concern requires overcoming a key roadblock, fuel storage, in a manner that permits sufficient quantity of fuel without sacrificing passenger or cargo capability. Fueling infrastructure, on the other hand, has been problematic. Only three of a planned seven stations were opened. The difficulty in obtaining public approval and local government support for hydrogen fuel, based largely on the fear of hydrogen that grew from past disasters and atomic weaponry, has inhibited progress and presents a major roadblock to implementation. In addition the cost of hydrogen production, in any of the methodologies used in this program, does not show a rapid reduction to commercially viable rates. On the positive side of this issue was the demonstrated safety of the fueling station, equipment and process. In the Ford program, there were no reported safety incidents.

Dr. Scott Staley

2010-03-31T23:59:59.000Z

116

BUILDING INSPECTION Building, Infrastructure, Transportation  

E-Print Network [OSTI]

BUILDING INSPECTION Building, Infrastructure, Transportation City of Redwood City 1017 Middlefield Sacramento, Ca 95814-5514 Re: Green Building Ordinance and the Building Energy Efficiency Standards Per of Redwood City enforce the current Title 24 Building Energy Efficiency Standards as part

117

Process Improvement at Army Installations  

E-Print Network [OSTI]

recommendations are for the Fill and Press line where most of the Level I focused LESSONS LEARNED On completion of the project, the researchers assessed the results and some of the 198 ESL-IE-97-04-31 Proceedings from the Nineteenth Industrial Energy.... Finally, the energy issues included initiate an energy team; install energy efficient lighting; and decommission unused steam lines. After the first cost, savings, and simple payback time was calculated for all of the proposed improvements, a...

Northrup, J.; Smith, E. D.; Lin, M.; Baird, J.

118

Participatory infrastructure monitoring : design factors and limitations of accountability technologies  

E-Print Network [OSTI]

This dissertation investigates practices of participatory infrastructure monitoring and their implications for the governance of urban infrastructure services. By introducing the concept of infrastructure legibility, the ...

Offenhuber, Dietmar

2014-01-01T23:59:59.000Z

119

Scanning the Technology Energy Infrastructure Defense Systems  

E-Print Network [OSTI]

systems and to develop de- fense plans to protect the network against extreme contingencies causedScanning the Technology Energy Infrastructure Defense Systems MASSOUD AMIN, SENIOR MEMBER, IEEE Energy infrastructure faced with deregulation and coupled with interdependencies with other critical

Amin, S. Massoud

120

The Electricity and Transportation Infrastructure Convergence  

E-Print Network [OSTI]

The Electricity and Transportation Infrastructure Convergence Using Electrical Vehicles Final Project Report Power Systems Engineering Research Center Empowering Minds to Engineer the Future Electric Energy System #12;#12;The Electricity and Transportation Infrastructure Convergence Using Electrical

Note: This page contains sample records for the topic "infrastructure evaluation installation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

National Environmental Information Infrastructure Reference Architecture  

E-Print Network [OSTI]

National Environmental Information Infrastructure Reference Architecture Consultation Draft Environmental Information Infrastructure Reference Architecture: Consultation Draft Environmental Information Contributing to the Australian Government National Plan for Environmental Information initiative #12;National

Greenslade, Diana

122

2nd International Hydrogen Infrastructure Challenges Webinar  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Answers Please type your question into the question box Agenda Overview Hydrogen Infrastructure by Region Fueling Quality Metering Station Hardware...

123

Africa's Transport Infrastructure Mainstreaming Maintenance and...  

Open Energy Info (EERE)

Mainstreaming Maintenance and Management Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Africa's Transport Infrastructure Mainstreaming Maintenance and Management...

124

Africa Infrastructure Country Diagnostic Documents: Interactive...  

Open Energy Info (EERE)

Not Available Website: infrastructureafrica.orgdocumentstoolslistinteractive-pdf-maps Transport Toolkit Region(s): Africa & Middle East Interactive infrastructure maps by...

125

Controlled Hydrogen Fleet and Infrastructure Demonstration and...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

More Documents & Publications Fuel Cell Technologies Program Overview: 2012 DOE Hydrogen Compression, Storage, and Dispensing Workshop Refueling Infrastructure for...

126

Controlled Hydrogen Fleet and Infrastructure Demonstration and...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

3veenstra.pdf More Documents & Publications Technology Validation Controlled Hydrogen Fleet & Infrastructure Analysis HYDROGEN TO THE HIGHWAYS...

127

Impact of increased electric vehicle use on battery recycling infrastructure  

SciTech Connect (OSTI)

State and Federal regulations have been implemented that are intended to encourage more widespread use of low-emission vehicles. These regulations include requirements of the California Air Resources Board (CARB) and regulations pursuant to the Clean Air Act Amendments of 1990 and the Energy Policy Act. If the market share of electric vehicles increases in response to these initiatives, corresponding growth will occur in quantities of spent electric vehicle batteries for disposal. Electric vehicle battery recycling infrastructure must be adequate to support collection, transportation, recovery, and disposal stages of waste battery handling. For some battery types, such as lead-acid, a recycling infrastructure is well established; for others, little exists. This paper examines implications of increasing electric vehicle use for lead recovery infrastructure. Secondary lead recovery facilities can be expected to have adequate capacity to accommodate lead-acid electric vehicle battery recycling. However, they face stringent environmental constraints that may curtail capacity use or new capacity installation. Advanced technologies help address these environmental constraints. For example, this paper describes using backup power to avoid air emissions that could occur if electric utility power outages disable emissions control equipment. This approach has been implemented by GNB Technologies, a major manufacturer and recycler of lead-acid batteries. Secondary lead recovery facilities appear to have adequate capacity to accommodate lead waste from electric vehicles, but growth in that capacity could be constrained by environmental regulations. Advances in lead recovery technologies may alleviate possible environmental constraints on capacity growth.

Vimmerstedt, L.; Hammel, C. [National Renewable Energy Lab., Golden, CO (United States); Jungst, R. [Sandia National Labs., Albuquerque, NM (United States)

1996-12-01T23:59:59.000Z

128

The X.509 Privilege Management Infrastructure  

E-Print Network [OSTI]

Management Infrastructure (PMI) introduced in the 2000 edition of X.509. It describes the entities Management Infrastructure (PMI), and it enables privileges to be allocated, delegated, revoked and withdrawn in an electronic way. A PMI is to authorisation what a Public Key Infrastructure (PKI) is to authentication

Kent, University of

129

A SECURE AUTHENTICATION INFRASTRUCTURE FOR MOBILE  

E-Print Network [OSTI]

. In this paper, we propose to secure an infrastructure providing telecommunication services on the Internet- bile Internet Telecommunication services (MobInTel). We present this infrastructure in detailsA SECURE AUTHENTICATION INFRASTRUCTURE FOR MOBILE COMMUNICATION SERVICES OVER THE INTERNET Ir

von Bochmann, Gregor

130

Performance of Installed Cooking Exhaust Devices  

SciTech Connect (OSTI)

The performance metrics of airflow, sound, and combustion product capture efficiency (CE) were measured for a convenience sample of fifteen cooking exhaust devices, as installed in residences. Results were analyzed to quantify the impact of various device- and installation-dependent parameters on CE. Measured maximum airflows were 70% or lower than values noted on product literature for 10 of the devices. Above-the-cooktop devices with flat bottom surfaces (no capture hood) – including exhaust fan/microwave combination appliances – were found to have much lower CE at similar flow rates, compared to devices with capture hoods. For almost all exhaust devices and especially for rear-mounted downdraft exhaust and microwaves, CE was substantially higher for back compared with front burner use. Flow rate, and the extent to which the exhaust device extends over the burners that are in use, also had a large effect on CE. A flow rate of 95 liters per second (200 cubic feet per minute) was necessary, but not sufficient, to attain capture efficiency in excess of 75% for the front burners. A-weighted sound levels in kitchens exceeded 57 dB when operating at the highest fan setting for all 14 devices evaluated for sound performance.

Singer, Brett C.; Delp, William W.; Apte, Michael G.; Price, Philip N.

2011-11-01T23:59:59.000Z

131

Automated solar collector installation design  

DOE Patents [OSTI]

Embodiments may include systems and methods to create and edit a representation of a worksite, to create various data objects, to classify such objects as various types of pre-defined "features" with attendant properties and layout constraints. As part of or in addition to classification, an embodiment may include systems and methods to create, associate, and edit intrinsic and extrinsic properties to these objects. A design engine may apply of design rules to the features described above to generate one or more solar collectors installation design alternatives, including generation of on-screen and/or paper representations of the physical layout or arrangement of the one or more design alternatives.

Wayne, Gary; Frumkin, Alexander; Zaydman, Michael; Lehman, Scott; Brenner, Jules

2014-08-26T23:59:59.000Z

132

Low-Cost Installation of Concentrating Photovoltaic  

E-Print Network [OSTI]

Low-Cost Installation of Concentrating Photovoltaic Renewable Energy Research Renewable Energy inhibit the potential growth of the California photovoltaic market: high installation costs, expenses improvements have been made in recent years on the assembly and deployment of flatplate photovoltaic

133

A scalable tools communication infrastructure.  

SciTech Connect (OSTI)

The Scalable Tools Communication Infrastructure (STCI) is an open source collaborative effort intended to provide high-performance, scalable, resilient, and portable communications and process control services for a wide variety of user and system tools. STCI is aimed specifically at tools for ultrascale computing and uses a component architecture to simplify tailoring the infrastructure to a wide range of scenarios. This paper describes STCI's design philosophy, the various components that will be used to provide an STCI implementation for a range of ultrascale platforms, and a range of tool types. These include tools supporting parallel run-time environments, such as MPI, parallel application correctness tools and performance analysis tools, as well as system monitoring and management tools.

Buntinas, D.; Bosilca, G.; Graham, R. L.; Vallee, G.; Watson, G. R.; Mathematics and Computer Science; Univ. of Tennessee; ORNL; IBM

2008-07-01T23:59:59.000Z

134

A Scalable Tools Communication Infrastructure  

SciTech Connect (OSTI)

The Scalable Tools Communication Infrastructure (STCI) is an open source collaborative effort intended to provide high-performance, scalable, resilient, and portable communications and process control services for a wide variety of user and system tools. STCI is aimed specifically at tools for ultrascale computing and uses a component architecture to simplify tailoring the infrastructure to a wide range of scenarios. This paper describes STCI's design philosophy, the various components that will be used to provide an STCI implementation for a range of ultrascale platforms, and a range of tool types. These include tools supporting parallel run-time environments, such as MPI, parallel application correctness tools and performance analysis tools, as well as system monitoring and management tools.

Buntinas, Darius [Argonne National Laboratory (ANL); Bosilca, George [University of Tennessee, Knoxville (UTK); Graham, Richard L [ORNL; Vallee, Geoffroy R [ORNL; Watson, Gregory R. [IBM T. J. Watson Research Center

2008-01-01T23:59:59.000Z

135

Presented by Petascale System Infrastructure  

E-Print Network [OSTI]

National Center for Computational Sciences #12;2 Managed by UT-Battelle for the U.S. Department of Energy and analysis cluster #12;3 Managed by UT-Battelle for the U.S. Department of Energy Shipman_Infrastructure_SC10 Area Network ­ Over 3,000 InfiniBand ports ­ Over 3 miles of cables ­ Scales as computational

136

Sandia National Laboratories: Hydrogen Infrastructure  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive SolarEducationStation Technology Infrastructure Research

137

ACS Installation During SM3B Introduction  

E-Print Network [OSTI]

ACS Installation During SM3B Introduction: · Installed during SM3B in March 2002 · Powerful 3rd · Over-voltage Protection kit installed · Optical Control Electronics connected · New Outer Blanket Layer, and coronagraph ­ Solar Blind Channel (SBC) : HST's most sensitive ultraviolet photon-counting detector 115-180 nm

Sirianni, Marco

138

ATLAS Installation Guide R. Clint Whaley  

E-Print Network [OSTI]

ATLAS Installation Guide R. Clint Whaley November 2, 2007 Abstract This note provides a brief overview of ATLAS, and describes how to install it. It includes extensive discussion of common configure to configure and build the ATLAS package, this note also describes how an installer can confirm

Whaley, R. Clint

139

Test and evaluation plan for the composite bridge  

SciTech Connect (OSTI)

Polymer matrix composites (PMC) are entering the nation`s infrastructure as alternatives to conventional materials. Working with the Federal Highway Administration and Department of Energy, the Idaho National Engineering and Environmental Laboratory is testing and evaluating a PMC structure for use in bridge rehabilitation and replacement. A 30-foot PMC bridge, designed and built by Lockheed Martin Missile and Space, will be field tested in Idaho. The design of this bridge represents simple support bridges in the 120-foot span category. This report describes the construction, transportation, installation, testing, and material properties for this PMC structure.

Rodriguez, J.G.; Dumlao, C.; Ciolko, A.T.; Pfister, T.J.; Schmeckpeper, E.R.

1997-04-01T23:59:59.000Z

140

A Strategic Project Appraisal framework for ecologically sustainable urban infrastructure  

SciTech Connect (OSTI)

Actors in the built environment are progressively considering environmental and social issues alongside functional and economic aspects of development projects. Infrastructure projects represent major investment and construction initiatives with attendant environmental, economic and societal impacts across multiple scales. To date, while sustainability strategies and frameworks have focused on wider national aspirations and strategic objectives, they are noticeably weak in addressing micro-level integrated decision making in the built environment, particularly for infrastructure projects. The proposed approach of this paper is based on the principal that early intervention is the most cost-effective and efficient means of mitigating the environmental effects of development projects, particularly macro infrastructure developments. A strategic overview of the various project alternatives, taking account for stakeholder and expert input, could effectively reduce project impacts/risks at low cost to the project developers but provide significant benefit to wider communities, including communities of future stakeholders. This paper is the first exploratory step in developing a more systematic framework for evaluating strategic alternatives for major metropolitan infrastructure projects, based on key sustainability principles. The developed Strategic Project Appraisal (SPA) framework, grounded in the theory of Strategic Environmental Assessment (SEA), provides a means of practically appraising project impacts and alternatives in terms of quantified ecological limits; addresses the neglected topic of metropolitan infrastructure as a means of delivering sustainability outcomes in the urban context and more broadly, seeks to open a debate on the potential for SEA methodology to be more extensively applied to address sustainability challenges in the built environment. Practically applied and timed appropriately, the SPA framework can enable better decision-making and more efficient resource allocation ensuring low impact infrastructure development.

Morrissey, John, E-mail: john.morrissey@rmit.edu.au [Centre for Design, RMIT University, GPO Box 2476, Melbourne VIC 3001 (Australia); Iyer-Raniga, Usha, E-mail: usha.iyer-raniga@rmit.edu.au [School of Property, Construction and Project Management, RMIT University, GPO Box 2476, Melbourne VIC 3001 (Australia); McLaughlin, Patricia; Mills, Anthony [School of Property, Construction and Project Management, RMIT University, GPO Box 2476, Melbourne VIC 3001 (Australia)

2012-02-15T23:59:59.000Z

Note: This page contains sample records for the topic "infrastructure evaluation installation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Infrastructure  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickrinformation for planningtoA

142

infrastructure  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review of theOFFICE OF8/%2A en Responding toheu |8/%2A2/%2A en

143

Infrastructure  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFunInfrared Land Surface Emissivity in the Vicinity of the

144

Retail Infrastructure Costs Comparison for Hydrogen and Electricity for Light-Duty Vehicles: Preprint  

SciTech Connect (OSTI)

Both hydrogen and plug-in electric vehicles offer significant social benefits to enhance energy security and reduce criteria and greenhouse gas emissions from the transportation sector. However, the rollout of electric vehicle supply equipment (EVSE) and hydrogen retail stations (HRS) requires substantial investments with high risks due to many uncertainties. We compare retail infrastructure costs on a common basis - cost per mile, assuming fueling service to 10% of all light-duty vehicles in a typical 1.5 million person city in 2025. Our analysis considers three HRS sizes, four distinct types of EVSE and two distinct EVSE scenarios. EVSE station costs, including equipment and installation, are assumed to be 15% less than today's costs. We find that levelized retail capital costs per mile are essentially indistinguishable given the uncertainty and variability around input assumptions. Total fuel costs per mile for battery electric vehicle (BEV) and plug-in hybrid vehicle (PHEV) are, respectively, 21% lower and 13% lower than that for hydrogen fuel cell electric vehicle (FCEV) under the home-dominant scenario. Including fuel economies and vehicle costs makes FCEVs and BEVs comparable in terms of costs per mile, and PHEVs are about 10% less than FCEVs and BEVs. To account for geographic variability in energy prices and hydrogen delivery costs, we use the Scenario Evaluation, Regionalization and Analysis (SERA) model and confirm the aforementioned estimate of cost per mile, nationally averaged, but see a 15% variability in regional costs of FCEVs and a 5% variability in regional costs for BEVs.

Melaina, M.; Sun, Y.; Bush, B.

2014-08-01T23:59:59.000Z

145

Sandia National Laboratories: Infrastructure Security  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive SolarEducationStation Technology InfrastructureIEEEVideoSAR

146

Sandia National Laboratories: Infrastructure Security  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive SolarEducationStation Technology InfrastructureIEEEVideoSARInfrastructure

147

Sandia National Laboratories: Infrastructure Security  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -theErik Spoerke SSLS Exhibit atVehicleEnergy Infrastructure On November 9, 2010, in

148

Climate Change and Infrastructure, Urban Systems, and Vulnerabilities  

SciTech Connect (OSTI)

This Technical Report on Climate Change and Infrastructure, Urban Systems, and Vulnerabilities has been prepared for the U.S. Department of Energy by the Oak Ridge National Laboratory in support of the U.S. National Climate Assessment (NCA). It is a summary of the currently existing knowledge base on its topic, nested within a broader framing of issues and questions that need further attention in the longer run. The report arrives at a number of assessment findings, each associated with an evaluation of the level of consensus on that issue within the expert community, the volume of evidence available to support that judgment, and the section of the report that provides an explanation for the finding. Cross-sectoral issues related to infrastructures and urban systems have not received a great deal of attention to date in research literatures in general and climate change assessments in particular. As a result, this technical report is breaking new ground as a component of climate change vulnerability and impact assessments in the U.S., which means that some of its assessment findings are rather speculative, more in the nature of propositions for further study than specific conclusions that are offered with a high level of confidence and research support. But it is a start in addressing questions that are of interest to many policymakers and stakeholders. A central theme of the report is that vulnerabilities and impacts are issues beyond physical infrastructures themselves. The concern is with the value of services provided by infrastructures, where the true consequences of impacts and disruptions involve not only the costs associated with the clean-up, repair, and/or replacement of affected infrastructures but also economic, social, and environmental effects as supply chains are disrupted, economic activities are suspended, and/or social well-being is threatened. Current knowledge indicates that vulnerability concerns tend to be focused on extreme weather events associated with climate change that can disrupt infrastructure services, often cascading across infrastructures because of extensive interdependencies threatening health and local economies, especially in areas where human populations and economic activities are concentrated in urban areas. Vulnerabilities are especially large where infrastructures are subject to multiple stresses, beyond climate change alone; when they are located in areas vulnerable to extreme weather events; and if climate change is severe rather than moderate. But the report also notes that there are promising approaches for risk management, based on emerging lessons from a number of innovative initiatives in U.S. cities and other countries, involving both structural and non-structural (e.g., operational) options.

Wilbanks, Thomas J [ORNL] [ORNL; Fernandez, Steven J [ORNL] [ORNL

2014-01-01T23:59:59.000Z

149

Focus Series: Maine-Residential Direct Install Program | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Maine-Residential Direct Install Program Focus Series: Maine-Residential Direct Install Program Better Buildings Neighborhood Program Focus Series: MAINE-Residential Direct Install...

150

Clean Cities Recovery Act: Vehicle & Infrastructure Deployment  

Broader source: Energy.gov (indexed) [DOE]

project through collection of vehicle, infrastructure and training information. RELEVANCE Alternative Fuel & Advance Technology Vehicles Pilot Program Clean Cities Recovery Act:...

151

Electric Vehicle Charging Infrastructure Deployment Guidelines...  

Open Energy Info (EERE)

Guidelines: British Columbia Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Electric Vehicle Charging Infrastructure Deployment Guidelines: British Columbia Agency...

152

Grant Helps Efficiently Rebuild Ohio Infrastructure | Department...  

Energy Savers [EERE]

ourselves to move forward with doing additional energy conservation and promoting renewables," Donna Winchester, environment manager for Dayton, says. "Our aging infrastructure...

153

Hydrogen Delivery Infrastructure Analysis, Options and Trade...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Analysis, Options and Trade-offs, Transition and Long-term Hydrogen Delivery Infrastructure Analysis, Options and Trade-offs, Transition and Long-term Presentation on Hydrogen...

154

Natural Gas and Hydrogen Infrastructure Opportunities Workshop...  

Broader source: Energy.gov (indexed) [DOE]

* Convene industry and other stakeholders to share current statusstate-of-the art for natural gas and hydrogen infrastructure. * Identify key challenges (both technical and...

155

Briefing Memo: Enhancing Resilience in Energy Infrastructure...  

Broader source: Energy.gov (indexed) [DOE]

on infrastructure vulnerabilities related to the electricity, natural gas and petroleum transmission, storage and distribution systems (TS&D). The meeting will consist of two...

156

Alternative Ways of Financing Infrastructure Investment: Potential...  

Open Energy Info (EERE)

'Novel' Financing Models Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Alternative Ways of Financing Infrastructure Investment: Potential for 'Novel' Financing Models...

157

Guide to Critical Infrastructure Protection Cyber Vulnerability...  

Broader source: Energy.gov (indexed) [DOE]

Implementing NERC Critical Infrastructure Protection Standards New No-Cost ANTFARM Tool Maps Control System Networks to Help Implement Cyber Security Standards "Cybersecurity for...

158

2nd International Hydrogen Infrastructure Challenges Webinar  

Broader source: Energy.gov [DOE]

Text version and video recording of the webinar titled "2nd International Hydrogen Infrastructure Challenges Webinar," originally presented on March 10, 2015.

159

Geographically Based Hydrogen Demand and Infrastructure Rollout...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Rollout Scenario Analysis Geographically Based Hydrogen Demand and Infrastructure Rollout Scenario Analysis Presentation by Margo Melendez at the 2010-2025 Scenario Analysis for...

160

Geographically Based Hydrogen Demand and Infrastructure Analysis...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Analysis Geographically Based Hydrogen Demand and Infrastructure Analysis Presentation by NREL's Margo Melendez at the 2010 - 2025 Scenario Analysis for Hydrogen Fuel Cell Vehicles...

Note: This page contains sample records for the topic "infrastructure evaluation installation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Hydrogen Infrastructure Market Readiness: Opportunities and Potential...  

Broader source: Energy.gov (indexed) [DOE]

Opportunities and Potential for Near-term Cost Reductions. Proceedings of the Hydrogen Infrastructure Market Readiness Workshop and Summary of Feedback Provided through the...

162

Controlled Hydrogen Fleet and Infrastructure Analysis (Presentation)  

SciTech Connect (OSTI)

This presentation by Keith Wipke at the 2007 DOE Hydrogen Program Annual Merit Review Meeting provides information about NREL's Controlled Hydrogen Fleet and Infrastructure Analysis Project.

Wipke, K.

2007-05-17T23:59:59.000Z

163

Electric Drive Vehicle Demonstration and Vehicle Infrastructure...  

Broader source: Energy.gov (indexed) [DOE]

Display Supporting Business Model Interactive Touch Screens ANSI Certified Energy Meter RFID Access Control Data Collected Ethernet Installed By Certified...

164

A Product Software Knowledge Infrastructure for  

E-Print Network [OSTI]

1 A Product Software Knowledge Infrastructure for Situational Capability Maturation: Vision and Case Studies in Product Management Inge van de Weerd, Johan Versendaal and Sjaak Brinkkemper Department-3275 #12;2 A Product Software Knowledge Infrastructure for Situational Capability Maturation: Vision

Utrecht, Universiteit

165

PEV Infrastructure Needs UC Davis Policy Institute  

E-Print Network [OSTI]

,000 sales in 2012, ramp up to 20,000/yr in 2013 2012 Honda Fit EV 2012 Tesla Model S Infrastructure needs1 PEV Infrastructure Needs UC Davis Policy Institute Policy Forum Series: ZEVs June 13, 2012 www into an increasingly clean, efficient, reliable, and safe electricity grid · PEVs advance energy security, air quality

California at Davis, University of

166

Enrollment for Core Infrastructure Customer Datasheet  

E-Print Network [OSTI]

the Core Infrastructure Suite (CIS) Datacenter or Standard Edition, or a mix of both. Either edition offers), with each Datacenter Edition license the number of virtual OSEs is unlimited. Core Infrastructure Suites of your IT environment. CIS Suite Datacenter Supports an unlimited number of virtual OSEs CIS Suite

Narasayya, Vivek

167

Newport Power Meter Drivers CD Installation Software  

E-Print Network [OSTI]

Newport Power Meter Drivers CD Installation Software Version 2.3.1 Revision Date: October 16, 2008 IMPORTANT NOTES: The USB drivers on your CD must be installed before the Newport Power Meter is connected to your PC (via USB cable). Manual: The latest manuals for the Newport Power Meters can be found

Kleinfeld, David

168

Want to Install A Satellite Dish ?  

E-Print Network [OSTI]

listed below to ensure proper installation of your dish. 1. Permanent alterations or modification utility lines would be interfered with by satellite dish post installation. 6. Entry into the unit in case of nearby utility lines or other factors. 3--Point of entry for satellite dish cable

Maxwell, Bruce D.

169

A DISTRIBUTED AUTOMATION SYSTEM FOR ELECTROPHYSICAL INSTALLATIONS  

E-Print Network [OSTI]

A DISTRIBUTED AUTOMATION SYSTEM FOR ELECTROPHYSICAL INSTALLATIONS V.R. Kozak Budker Institute There was designed a set of devices for automation systems of physical installations. On this basis approach. KEY WORDS Automation, systems, applications, CANBUS, embedded, controller. 1. Introduction Budker

Kozak, Victor R.

170

Site Support Program Plan Infrastructure Program  

SciTech Connect (OSTI)

The Fiscal Year 1996 Infrastructure Program Site Support Program Plan addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition. The Hanford Site`s infrastructure has served the Site for nearly 50 years during defense materials production. Now with the challenges of the new environmental cleanup mission, Hanford`s infrastructure must meet current and future mission needs in a constrained budget environment, while complying with more stringent environmental, safety, and health regulations. The infrastructure requires upgrading, streamlining, and enhancement in order to successfully support the site mission of cleaning up the Site, research and development, and economic transition.

NONE

1995-09-26T23:59:59.000Z

171

S E R I E S SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES  

E-Print Network [OSTI]

S E R I E S SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES COMMISSION platform for distributed hybrid testing #12;SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN? Celestina Overview Implementation Validation Next steps #12;SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES

172

SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES ENISTAT: Experimental and  

E-Print Network [OSTI]

SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES ENISTAT: Experimental-TA Project #12;SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES Partners (Users) · METU Ragueneau · SCHOECK (Germany): Steffen Scheer, Seref Diler #12;SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES

173

S E R I E S SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES  

E-Print Network [OSTI]

S E R I E S SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES COMMISSION Database: Architecture and implementation #12;SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN Conclusions #12;SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES 3 SERIES Concluding

174

taking charge : optimizing urban charging infrastructure for shared electric vehicles  

E-Print Network [OSTI]

This thesis analyses the opportunities and constraints of deploying charging infrastructure for shared electric vehicles in urban environments. Existing electric vehicle charging infrastructure for privately owned vehicles ...

Subramani, Praveen

2012-01-01T23:59:59.000Z

175

AVTA: ARRA EV Project Charging Infrastructure Data Summary Reports...  

Broader source: Energy.gov (indexed) [DOE]

Charging Infrastructure Data Summary Reports AVTA: ARRA EV Project Charging Infrastructure Data Summary Reports The Vehicle Technologies Office's Advanced Vehicle Testing Activity...

176

Fuel Cell Electric Vehicles and Hydrogen Infrastructure: Deployment...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Fuel Cell Electric Vehicles and Hydrogen Infrastructure: Deployment and Issues Fuel Cell Electric Vehicles and Hydrogen Infrastructure: Deployment and Issues This presentation by...

177

Challenge # 2 Logistics and Compatibility with Existing Infrastructure...  

Office of Environmental Management (EM)

2 Logistics and Compatibility with Existing Infrastructure Throughout Supply Chain Challenge 2 Logistics and Compatibility with Existing Infrastructure Throughout Supply Chain...

178

Evalutation of Natural Gas Pipeline Materials and Infrastructure...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Evalutation of Natural Gas Pipeline Materials and Infrastructure for HydrogenMixed Gas Service Evalutation of Natural Gas Pipeline Materials and Infrastructure for HydrogenMixed...

179

Midstream Infrastructure Improvements Key to Realizing Full Potential...  

Office of Environmental Management (EM)

Midstream Infrastructure Improvements Key to Realizing Full Potential of Domestic Natural Gas Midstream Infrastructure Improvements Key to Realizing Full Potential of Domestic...

180

Antioch University and EPA Webinar: Green Infrastructure and...  

Office of Environmental Management (EM)

Antioch University and EPA Webinar: Green Infrastructure and Flood Resiliency Webinar Antioch University and EPA Webinar: Green Infrastructure and Flood Resiliency Webinar January...

Note: This page contains sample records for the topic "infrastructure evaluation installation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

FY 2014 Scientific Infrastructure Support for Consolidated Innovative...  

Office of Environmental Management (EM)

4 Scientific Infrastructure Support for Consolidated Innovative Nuclear Research FOA FY 2014 Scientific Infrastructure Support for Consolidated Innovative Nuclear Research FOA The...

182

CHP: Enabling Resilient Energy Infrastructure for Critical Facilities...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

policies designed to promote CHP in critical infrastructure applications. Combined Heat and Power: Enabling Resilient Energy Infrastructure for Critical Facilities (March...

183

Green Infrastructure and Flood Resiliency-Land Use Management...  

Office of Environmental Management (EM)

Green Infrastructure and Flood Resiliency-Land Use Management as an Adaptation Strategy in the Built Environment Green Infrastructure and Flood Resiliency-Land Use Management as an...

184

Webinar: Creating a Green Infrastructure Plan to Transform Your...  

Broader source: Energy.gov (indexed) [DOE]

Webinar: Creating a Green Infrastructure Plan to Transform Your Community Webinar: Creating a Green Infrastructure Plan to Transform Your Community November 18, 2014 3:00PM to...

185

EPA Webcast - Creating a Green Infrastructure Plan to Transform...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

EPA Webcast - Creating a Green Infrastructure Plan to Transform Your Community EPA Webcast - Creating a Green Infrastructure Plan to Transform Your Community November 18, 2014...

186

April 7 Webinar on OE's Resilient Electricity Delivery Infrastructure...  

Energy Savers [EERE]

April 7 Webinar on OE's Resilient Electricity Delivery Infrastructure Initiative FOA April 7 Webinar on OE's Resilient Electricity Delivery Infrastructure Initiative FOA March 23,...

187

AVTA: ARRA EV Project Residential Charging Infrastructure Maps...  

Broader source: Energy.gov (indexed) [DOE]

Residential Charging Infrastructure Maps AVTA: ARRA EV Project Residential Charging Infrastructure Maps The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries...

188

Implementing a Hydrogen Energy Infrastructure: Storage Options and System Design  

E-Print Network [OSTI]

to International Journal of Hydrogen Energy (November 2005).05—28 Implementing a Hydrogen Energy Infrastructure: StorageImplementing a Hydrogen Energy Infrastructure: Storage

Ogden, Joan M; Yang, Christopher

2005-01-01T23:59:59.000Z

189

FY 2003 Progress Report for Hydrogen, Fuel Cells and Infrastructure...  

Broader source: Energy.gov (indexed) [DOE]

FY 2003 Progress Report for Hydrogen, Fuel Cells and Infrastructure Technologies Program FY 2003 Progress Report for Hydrogen, Fuel Cells and Infrastructure Technologies Program...

190

HyDIVE (Hydrogen Dynamic Infrastructure and Vehicle Evolution...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

HyDIVE (Hydrogen Dynamic Infrastructure and Vehicle Evolution) Model Analysis HyDIVE (Hydrogen Dynamic Infrastructure and Vehicle Evolution) Model Analysis Presentation by NREL's...

191

Hydrogen Vehicle and Infrastructure Codes and Standards Citations...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Vehicle and Infrastructure Codes and Standards Citations Hydrogen Vehicle and Infrastructure Codes and Standards Citations This document lists codes and standards typically used...

192

H2A Hydrogen Delivery Infrastructure Analysis Models and Conventional...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

H2A Hydrogen Delivery Infrastructure Analysis Models and Conventional Pathway Options Analysis Results - Interim Report H2A Hydrogen Delivery Infrastructure Analysis Models and...

193

Critical infrastructure systems of systems assessment methodology.  

SciTech Connect (OSTI)

Assessing the risk of malevolent attacks against large-scale critical infrastructures requires modifications to existing methodologies that separately consider physical security and cyber security. This research has developed a risk assessment methodology that explicitly accounts for both physical and cyber security, while preserving the traditional security paradigm of detect, delay, and respond. This methodology also accounts for the condition that a facility may be able to recover from or mitigate the impact of a successful attack before serious consequences occur. The methodology uses evidence-based techniques (which are a generalization of probability theory) to evaluate the security posture of the cyber protection systems. Cyber threats are compared against cyber security posture using a category-based approach nested within a path-based analysis to determine the most vulnerable cyber attack path. The methodology summarizes the impact of a blended cyber/physical adversary attack in a conditional risk estimate where the consequence term is scaled by a ''willingness to pay'' avoidance approach.

Sholander, Peter E.; Darby, John L.; Phelan, James M.; Smith, Bryan; Wyss, Gregory Dane; Walter, Andrew; Varnado, G. Bruce; Depoy, Jennifer Mae

2006-10-01T23:59:59.000Z

194

Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.  

SciTech Connect (OSTI)

Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

Richards, Elizabeth H.; Schindel, Kay (City of Madison, WI); Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William (Lindau Companies, Inc., Hudson, WI); Harper, Alan (City of Madison, WI)

2011-12-01T23:59:59.000Z

195

Fluxnet Synthesis Dataset Collaboration Infrastructure  

SciTech Connect (OSTI)

The Fluxnet synthesis dataset originally compiled for the La Thuile workshop contained approximately 600 site years. Since the workshop, several additional site years have been added and the dataset now contains over 920 site years from over 240 sites. A data refresh update is expected to increase those numbers in the next few months. The ancillary data describing the sites continues to evolve as well. There are on the order of 120 site contacts and 60proposals have been approved to use thedata. These proposals involve around 120 researchers. The size and complexity of the dataset and collaboration has led to a new approach to providing access to the data and collaboration support and the support team attended the workshop and worked closely with the attendees and the Fluxnet project office to define the requirements for the support infrastructure. As a result of this effort, a new website (http://www.fluxdata.org) has been created to provide access to the Fluxnet synthesis dataset. This new web site is based on a scientific data server which enables browsing of the data on-line, data download, and version tracking. We leverage database and data analysis tools such as OLAP data cubes and web reports to enable browser and Excel pivot table access to the data.

Agarwal, Deborah A.; Humphrey, Marty; van Ingen, Catharine; Beekwilder, Norm; Goode, Monte; Jackson, Keith; Rodriguez, Matt; Weber, Robin

2008-02-06T23:59:59.000Z

196

Transforming the U.S. Energy Infrastructure  

SciTech Connect (OSTI)

The U.S. energy infrastructure is among the most reliable, accessible and economic in the world. On the other hand, the U.S. energy infrastructure is excessively reliant on foreign sources of energy, experiences high volatility in energy prices, does not practice good stewardship of finite indigenous energy resources and emits significant quantities of greenhouse gases (GHG). This report presents a Technology Based Strategy to achieve a full transformation of the U.S. energy infrastructure that corrects these negative factors while retaining the positives.

Larry Demick

2010-07-01T23:59:59.000Z

197

Rainwater Harvesting Program Evaluation  

E-Print Network [OSTI]

and collect rainwater and divert to landscape areas that need extra water Install a rainwater harvestingRainwater Harvesting Program Evaluation Your views on the quality and effectiveness of Extension system Install a rainwater harvesting system to water landscape Install a rainwater harvesting system

198

Assessing the Vulnerability of Large Critical Infrastructure Using Fully-Coupled Blast Effects Modeling  

SciTech Connect (OSTI)

Structural failures, such as the MacArthur Maze I-880 overpass in Oakland, California and the I-35 bridge in Minneapolis, Minnesota, are recent examples of our national infrastructure's fragility and serve as an important reminder of such infrastructure in our everyday lives. These two failures, as well as the World Trade Center's collapse and the levee failures in New Orleans, highlight the national importance of protecting our infrastructure as much as possible against acts of terrorism and natural hazards. This paper describes a process for evaluating the vulnerability of critical infrastructure to large blast loads using a fully-coupled finite element approach. A description of the finite element software and modeling technique is discussed along with the experimental validation of the numerical tools. We discuss how such an approach can be used for specific problems such as modeling the progressive collapse of a building.

McMichael, L D; Noble, C R; Margraf, J D; Glascoe, L G

2009-03-26T23:59:59.000Z

199

Structural Code Considerations for Solar Rooftop Installations.  

SciTech Connect (OSTI)

Residential rooftop solar panel installations are limited in part by the high cost of structural related code requirements for field installation. Permitting solar installations is difficult because there is a belief among residential permitting authorities that typical residential rooftops may be structurally inadequate to support the additional load associated with a photovoltaic (PV) solar installation. Typical engineering methods utilized to calculate stresses on a roof structure involve simplifying assumptions that render a complex non-linear structure to a basic determinate beam. This method of analysis neglects the composite action of the entire roof structure, yielding a conservative analysis based on a rafter or top chord of a truss. Consequently, the analysis can result in an overly conservative structural analysis. A literature review was conducted to gain a better understanding of the conservative nature of the regulations and codes governing residential construction and the associated structural system calculations.

Dwyer, Stephen F.; Dwyer, Brian P.; Sanchez, Alfred

2014-12-01T23:59:59.000Z

200

AIR LEAKAGE OF NEWLY INSTALLED RESIDENTIAL WINDOWS  

E-Print Network [OSTI]

Tables 2.0.2a 2.0.2b PAGE Air Leakage Through Sash/FrameOperation Types . . . . . Air Leakage of Installed WindowsComparison of Window Types Air Leakage Performance of

Weidt, John

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "infrastructure evaluation installation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Install an Automatic Blowdown Control System  

SciTech Connect (OSTI)

This revised ITP steam tip sheet on installing automatic blowdown controls provide how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

Not Available

2006-01-01T23:59:59.000Z

202

Peoples Gas – Single Family Direct Install (Illinois)  

Broader source: Energy.gov [DOE]

Owners of single-family homes, condos, townhomes and two-flats may be eligible for a free installation of new programmable thermostats, pipe insulation, showerheads, and faucet aerators through...

203

Install Removable Insulation on Valves and Fittings  

SciTech Connect (OSTI)

This revised ITP tip sheet on installing removable insulation on valves and fittings provides how-to advice for improving the system using low-cost, proven practices and technologies.

Not Available

2006-01-01T23:59:59.000Z

204

Optimizing Installation, Operation, and Maintenance at Offshore...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

wind industries, and significant first-hand knowledge of offshore installation, operation and maintenance (IO&M) activities. The aim of the GL GH study was to enable project...

205

Delaware Transportation Infrastructure Forum Problem Identification Statements  

E-Print Network [OSTI]

2013 Delaware Transportation Infrastructure Forum Problem Identification Statements Sponsored by The Delaware Center for Transportation and the Delaware Department of Transportation Delaware Center for Transportation Your main resource for transportation education and research Identifying Important Issues Related

Firestone, Jeremy

206

Costs Associated With Propane Vehicle Fueling Infrastructure  

SciTech Connect (OSTI)

This document is designed to help fleets understand the cost factors associated with propane vehicle fueling infrastructure. It provides an overview of the equipment and processes necessary to develop a propane fueling station and offers estimated cost ranges.

Smith, M.; Gonzales, J.

2014-08-01T23:59:59.000Z

207

Geographically Based Infrastructure Margo Melendez & Keith Parks  

E-Print Network [OSTI]

is incentive to purchase Alternative Fuels Data Center, EERE #12;Description of Metrics Vehicle Clean Cities Coalitions Alternative Fuels Data Center, EERE #12;Preliminary Findings #12;Preliminary;Geographically-Based Infrastructure Analysis (GIA) Utilizes GIS, geographically segregated data, and transition

208

Enforcement Letter, Parsons Infrastructure & Technology Group...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

13, 2009 Issued to Parsons Infrastructure & Technology Group, Inc., related to a Form Wood Timber Fire at the Salt Waste Processing Facility at the Savannah River Site On July...

209

Natural Gas and Hydrogen Infrastructure Opportunities: Markets...  

Broader source: Energy.gov (indexed) [DOE]

h presentation slides: Natural Gas and hydrogen Infrastructure opportunities: markets and Barriers to Growth Matt Most, Encana Natural Gas 1 OctOber 2011 | ArgOnne nAtiOnAl...

210

Dispersion of agglomeration through transport infrastructure  

E-Print Network [OSTI]

My dissertation aims to assess transport infrastructure's influence on the productivity, scale and distribution of urban economic activities through changing intercity accessibility. Standard project-level cost-benefit ...

Fang, Wanli, Ph. D. Massachusetts Institute of Technology

2013-01-01T23:59:59.000Z

211

Modeling Risks in Infrastructure Asset Management  

E-Print Network [OSTI]

in privatizing and operational risks in maintenance and rehabilitation of infrastructure facilities. To this end, a valuation procedure for valuing large-scale risky projects is proposed. This valuation approach is based on mean-risk portfolio optimization...

Seyedolshohadaie, Seyed Reza

2012-10-19T23:59:59.000Z

212

Opportunistic infrastructure : the Trans-Manhattan Expressway  

E-Print Network [OSTI]

Urban Infrastructure: bridges, expressways, and on and off ramps often create barriers and uninhabitable spaces within the urban context. This phenomenon is evident in northern Manhattan where the Trans-Manhattan Expressway ...

O'Koren, Jason F

2010-01-01T23:59:59.000Z

213

Public private partnership in infrastructure financing  

E-Print Network [OSTI]

The global financial crisis, which was unique in its magnitude and after effects, has generated significant interest in Public Private Partnership (PPP). Lack of investments and deteriorated infrastructure challenges ...

Ahmed, Anas

2014-01-01T23:59:59.000Z

214

Hydrogen Fueling Infrastructure Research and Station Technology  

Broader source: Energy.gov [DOE]

Presentation slides from the DOE Fuel Cell Technologies Office webinar "An Overview of the Hydrogen Fueling Infrastructure Research and Station Technology (H2FIRST) Project" held on November 18, 2014.

215

Electric Drive Vehicle Demonstration and Vehicle Infrastructure...  

Broader source: Energy.gov (indexed) [DOE]

EVSE Designed And Manufactured To Allow Power And Energy Data Collection And Demand Response Control Residential EVSE Installed For All Vehicles 1,300...

216

Evaluation Project 4492  

Broader source: Energy.gov (indexed) [DOE]

purchase, build and install tooling in the Product Certification Organization area to allow the movement and radio-graphing of component for evaluation to determine the proper...

217

The scientific case for eInfrastructure in Norway  

E-Print Network [OSTI]

The scientific case for eInfrastructure in Norway The eInfrastructure Scientific Opportunities Panel #12;2 3 The scientific case for eInfrastructure in Norway The eInfrastructure Scientific Opportunities Panel Appointed by the Research Council of Norway Galen Gisler (chair) Physics of Geological

Helgaker, Trygve

218

SERIES workshopSERIES workshop Role of research infrastructures in seismic rehabilitationRole of research infrastructures in seismic rehabilitationRole of research infrastructures in seismic rehabilitationRole of research infrastructures in seismic rehabi  

E-Print Network [OSTI]

SERIES workshopSERIES workshop Role of research infrastructures in seismic rehabilitationRole of research infrastructures in seismic rehabilitationRole of research infrastructures in seismic rehabilitationRole of research infrastructures in seismic rehabilitation Istanbul, 8Istanbul, 8--9 February 20129

219

Energy Secretary Chu Announces Five Million Smart Meters Installed...  

Office of Environmental Management (EM)

metering infrastructure (AMI), distribution automation technologies, new electricity pricing programs, and advanced monitoring equipment for the transmission system. The goal...

220

Spatial Data Infrastructure of the Plurinational State of Bolivia Spatial Data Infrastructure of the  

E-Print Network [OSTI]

Spatial Data Infrastructure of the Plurinational State of Bolivia Spatial Data Infrastructure of the Plurinational State of Bolivia A free and democratic SDI by Raul Fernando Molina Rodriguez and Sylvain Lesage GeoBolivia (Bolivia). rmolina@geo.gob.bo Abstract The Vice Presidency of the State, with the help

Köbben, Barend

Note: This page contains sample records for the topic "infrastructure evaluation installation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Utility Scale Renewable Energy Development Near DOD Installations...  

Broader source: Energy.gov (indexed) [DOE]

Utility Scale Renewable Energy Development Near DOD Installations: Making the Case for Land Use Compatitbility Utility Scale Renewable Energy Development Near DOD Installations:...

222

Database (Report) of U.S. CHP Installations Incorporating Thermal...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Database (Report) of U.S. CHP Installations Incorporating Thermal Energy Storage (TES) andor Turbine Inlet Cooling (TIC), 2004 Database (Report) of U.S. CHP Installations...

223

Obama Administration Announces Plans to Install New Solar Panels...  

Broader source: Energy.gov (indexed) [DOE]

Plans to Install New Solar Panels on the White House Residence Obama Administration Announces Plans to Install New Solar Panels on the White House Residence October 5, 2010 -...

224

Building America Expert Meeting Report: Achieving the Best Installed...  

Broader source: Energy.gov (indexed) [DOE]

Achieving the Best Installed Performance from High-Efficiency Residential Gas Furnaces Building America Expert Meeting Report: Achieving the Best Installed Performance from...

225

H2-Assisted NOx Traps: Test Cell Results Vehicle Installations...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

H2-Assisted NOx Traps: Test Cell Results Vehicle Installations H2-Assisted NOx Traps: Test Cell Results Vehicle Installations 2003 DEER Conference Presentation: ArvinMeritor...

226

Final Report on National NGV Infrastructure  

SciTech Connect (OSTI)

This report summarizes work fimded jointly by the U.S. Department of Energy (DOE) and by the Gas Research Institute (GRI) to (1) identi& barriers to establishing sustainable natural gas vehicle (NGV) infrastructure and (2) develop planning information that can help to promote a NGV infrastructure with self-sustaining critical maw. The need for this work is driven by the realization that demand for NGVS has not yet developed to a level that provides sufficient incentives for investment by the commercial sector in all necessary elements of a supportive infrastructure. The two major objectives of this project were: (1) to identifi and prioritize the technical barriers that may be impeding growth of a national NGV infrastructure and (2) to develop input that can assist industry in overcoming these barriers. The approach used in this project incorporated and built upon the accumulated insights of the NGV industry. The project was conducted in three basic phases: (1) review of the current situation, (2) prioritization of technical infrastructure btiiers, and (3) development of plans to overcome key barriers. An extensive and diverse list of barriers was obtained from direct meetings and telephone conferences with sixteen industry NGV leaders and seven Clean Cities/Clean Corridors coordinators. This information is filly documented in the appendix. A distillation of insights gained in the interview process suggests that persistent barriers to developing an NGV market and supporting infrastructure can be grouped into four major categories: 1. Fuel station economics 2. Value of NGVs from the owner/operator perspective 3. Cooperation necessary for critical mass 4. Commitment by investors. A principal conclusion is that an efficient and effective approach for overcoming technical barriers to developing an NGV infrastructure can be provided by building upon and consolidating the relevant efforts of the NGV industry and government. The major recommendation of this project is the establishment of an ad hoc NGV Infrastructure Working Group (NGV-I WG) to address the most critical technical barriers to NGV infrastructure development. This recommendation has been considered and approved by both the DOE and GRI and is the basis of continued collaboration in this area.

GM Sverdrup; JG DeSteese; ND Malcosky

1999-01-07T23:59:59.000Z

227

TECHNOLOGIES TO ENHANCE THE OPERATION OF EXISTING NATURAL GAS COMPRESSION INFRASTRUCTURE  

SciTech Connect (OSTI)

This quarterly report documents work performed under Tasks 15, 16, and 18 through 23 of the project entitled: ''Technologies to Enhance the Operation of Existing Natural Gas Compression Infrastructure''. The project objective is to develop and substantiate methods for operating integral engine/compressors in gas pipeline service, which reduce fuel consumption, increase capacity, and enhance mechanical integrity. The report first summarizes key results from survey site tests performed on an HBA-6 installed at Duke Energy's Bedford compressor station, and on a TCVC10 engine/compressor installed at Dominion's Groveport Compressor Station. The report then presents results of design analysis performed on the Bedford HBA-6 to develop options and guide decisions for reducing pulsations and enhancing compressor system efficiency and capacity. The report further presents progress on modifying and testing the laboratory GMVH6 at SwRI for correcting air imbalance.

Anthony J. Smalley; Ralph E. Harris; Gary D. Bourn; Danny M. Deffenbaugh

2005-10-27T23:59:59.000Z

228

TECHNOLOGIES TO ENHANCE THE OPERATION OF EXISTNG NATURAL GAS COMPRESSION INFRASTRUCTURE  

SciTech Connect (OSTI)

This quarterly report documents work performed under Tasks 15, 16, and 18 through 23 of the project entitled: ''Technologies to Enhance the Operation of the Existing Natural Gas Compression Infrastructure''. The project objective is to develop and substantiate methods for operating integral engine/compressors in gas pipeline service, which reduce fuel consumption, increase capacity, and enhance mechanical integrity. The report first documents a survey test performed on an HBA-6 engine/compressor installed at Duke Energy's Bedford Compressor Station. This is one of several tests planned, which will emphasize identification and reduction of compressor losses. Additionally, this report presents a methodology for distinguishing losses in compressor attributable to valves, irreversibility in the compression process, and the attached piping (installation losses); it illustrates the methodology with data from the survey test. The report further presents the validation of the simulation model for the Air Balance tasks and outline of conceptual manifold designs.

Anthony J. Smalley; Ralph E. Harris; Gary D. Bourn; Danny M. Deffenbaugh

2005-01-28T23:59:59.000Z

229

Enhancing Energy Infrastructure Resiliency and Addressing Vulnerabilities  

Broader source: Energy.gov [DOE]

Quadrennial Energy Review Task Force Secretariat and Energy Policy and Systems Analysis Staff, U. S. Department of Energy (DOE) Public Meeting on “Enhancing Resilience in Energy Infrastructure and Addressing Vulnerabilities” On Friday, April 11, 2014, at 10 a.m. in room HVC-215 of the U.S. Capitol, the Department of Energy (DOE), acting as the Secretariat for the Quadrennial Energy Review Task Force, will hold a public meeting to discuss and receive comments on issues related to the Quadrennial Energy Review (QER). The meeting will focus on infrastructure vulnerabilities related to the electricity, natural gas and petroleum transmission, storage and distribution systems (TS&D). The meeting will consist of two facilitated panels of experts on identifying and addressing vulnerabilities within the nation’s energy TS&D infrastructure. Following the panels, an opportunity will be provided for public comment via an open microphone session. The meeting will be livestreamed at energy.gov/live

230

Securing Infrastructure from High Explosive Threats  

SciTech Connect (OSTI)

Lawrence Livermore National Laboratory (LLNL) is working with the Department of Homeland Security's Science and Technology Directorate, the Transportation Security Administration, and several infrastructure partners to characterize and help mitigate principal structural vulnerabilities to explosive threats. Given the importance of infrastructure to the nation's security and economy, there is a clear need for applied research and analyses (1) to improve understanding of the vulnerabilities of these systems to explosive threats and (2) to provide decision makers with time-critical technical assistance concerning countermeasure and mitigation options. Fully-coupled high performance calculations of structural response to ideal and non-ideal explosives help bound and quantify specific critical vulnerabilities, and help identify possible corrective schemes. Experimental validation of modeling approaches and methodologies builds confidence in the prediction, while advanced stochastic techniques allow for optimal use of scarce computational resources to efficiently provide infrastructure owners and decision makers with timely analyses.

Glascoe, L; Noble, C; Reynolds, J; Kuhl, A; Morris, J

2009-03-20T23:59:59.000Z

231

Installation & Commissioning same basic idea as CTB  

E-Print Network [OSTI]

requires Freon-only gas system HV spare TCPU and one LV supply laptop with pcan dongle simple water flow though too heavy for two people need rail holder on the scissor lift or rail holder on spreader bar be installed beforehand, and "short" LV bus Canbus Data cables Water in/out HV (2) and Gas in/out attached

Llope, William J.

232

Installing Small Wind Turbines Seminar and Workshop  

E-Print Network [OSTI]

Seminar and Workshop Installing Small Wind Turbines Seminar and Workshop Location: Murdoch January 2011 Details for Registration and Payment: Mr Daniel Jones, National Small Wind Turbine Test: The National Small Wind Turbine Centre at Murdoch University is holding a Small Wind Turbine short training

233

IEA HPP Annex 36 Installation/Quality  

E-Print Network [OSTI]

on installation of air to air heat pump The aim is to use an ergonomic approach, in order to reduce Laboratory European Heat Pump Summit Nuremberg, Germany October 15, 2013 #12;3 Managed by UT), USA 3 10-11 October 2013 EdF, France 4 12 May 2014 Workshop at IEA Heat Pump conference, Montreal

Oak Ridge National Laboratory

234

Standard hydrogen monitoring system equipment installation instructions  

SciTech Connect (OSTI)

This document provides the technical specifications for the equipment fabrication, installation, and sitework construction for the Standard Hydrogen Monitoring System. The Standard Hydrogen Monitoring System is designed to remove gases from waste tank vapor space and exhaust headers for continual monitoring and remote sample analysis.

Schneider, T.C.

1996-09-27T23:59:59.000Z

235

INSTRUMENT EVALUATION, CALIBRATION, AND INSTALLATION POME HEATER EXPERIMENTS AT STRIPA  

E-Print Network [OSTI]

Properties of Stripa Granite. Lawrence Berkeley LaboratoryGroundwaters in the Stripa Granite: Results and PreliminaryStorage of Nuclear Waste in Granite by P. A. Witherspoon, P.

Schrauf, T.

2010-01-01T23:59:59.000Z

236

Experimental Evaluation of Installed Cooking Exhaust Fan Performance  

E-Print Network [OSTI]

liquefied   natural  gas  (LNG)  from  Pacific  Rim  potential   impacts  of  using  LNG  with  the  existing  performance  impacts  of  LNG  use  in  California.  

Singer, Brett C.

2011-01-01T23:59:59.000Z

237

Experimental Evaluation of Installed Cooking Exhaust Fan Performance  

E-Print Network [OSTI]

air  quality,  kitchen,  oven,  nitrogen  dioxide,  pollutant   emissions,  range  hood,  residential,  source  control,  

Singer, Brett C.

2011-01-01T23:59:59.000Z

238

Experimental Evaluation of Installed Cooking Exhaust Fan Performance  

E-Print Network [OSTI]

High High Fan (cfm) Burner Fire Btu/hr A- 50 Fan/Plume EffLow Fan (cfm) Burner Fire Btu/hr Fan/Plume Eff Figure  3.  Med Fan (cfm) Burner Fire Btu/hr Fan/Plume Eff Figure  7.  

Singer, Brett C.

2011-01-01T23:59:59.000Z

239

Adaptive Infrastructures Toward a Secure and  

E-Print Network [OSTI]

. Maintenance scheduling Months to 1 year; ongoing. Expansion planning Years; ongoing Power plant site selection-Scale Time Hierarchy of Power Systems ACTION / OPERATION TIME FRAME Wave effects (fast dynamics, lightning and simulation tools that help build a basic understanding of the dynamics of complex infrastructures

Amin, S. Massoud

240

London 2012 Infrastructure Design, Sustainability and Innovation,  

E-Print Network [OSTI]

February 2013 #12;#12;London 2012 Aspiration of a Sustainable Games #12;#12;Project Management , for both soil and groundwater treatment. As part of this work, we have managed the excavation and reuseLondon 2012 Infrastructure Design, Sustainability and Innovation, Inspiring an Industry

Painter, Kevin

Note: This page contains sample records for the topic "infrastructure evaluation installation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Future Internet Infrastructures for FI Prototyping  

E-Print Network [OSTI]

++ Fraunhofer Institute FOKUS, Berlin ++ www.fokus.fraunhofer.de/go/innovation ++ 11­2009 #12;Future Internet Berlin AV de- partment (Architektur für Vermittlungskno- ten). Part of the Fraunhofer innovation clusFuture Internet Infrastructures for FI Prototyping NGN Evolution toward Future Internet Fraunhofer

Wichmann, Felix

242

Intrusion-Tolerant Protection for Critical Infrastructures  

E-Print Network [OSTI]

of an organization in the face of accidents and attacks. How- ever, they are not simple firewalls but distributed]. In recent years these systems evolved in several aspects that greatly increased their exposure to cyber-attacks, a critical information infrastructure is formed by facilities, like power transformation substations or cor

Neves, Nuno

243

PROTECTING INFRASTRUCTURE ASSETS FROM REAL-TIME  

E-Print Network [OSTI]

be used to protect communications of an IEC61850-90-5-compliant substation automation system in an electricity grid. Also, it discusses the impact of run-time attacks on TC-compliant critical infrastructure The Stuxnet worm has demonstrated the effectiveness of cyber attacks on industrial facilities. The potentially

Burmester, Mike

244

AIFdb: Infrastructure for the Argument Web  

E-Print Network [OSTI]

AIFdb: Infrastructure for the Argument Web John LAWRENCE, Floris BEX, Chris REED and Mark SNAITH, a database solution for the Ar- gument Web. AIFdb offers an array of web service interfaces allowing a wide Interchange Format, argument web 1. Introduction The Argument Web [3] is a vision for a large-scale Web

Reed, Chris

245

Taming the Energy Hog in Cloud Infrastructure  

E-Print Network [OSTI]

energy consumption consumed 61 Billion kWh in 2006, enough to power 5.8 Million average US households constrained #12;Energy Expenditure of The Cloud The IT industry is on fire! constitutes about 2% of total USTaming the Energy Hog in Cloud Infrastructure Jie Liu Microsoft Research liuj@microsoft.com RTSS

Hunt, Galen

246

Energy Theft in the Advanced Metering Infrastructure  

E-Print Network [OSTI]

of the smart grid is an advanced metering infrastructure (AMI). AMI replaces the analog meters, but that current AMI devices introduce a myriad of new vectors for achieving it. Key words: AMI, Smart meter currently deployed smart-meters, and attempt to identify root causes of existing vulnerabilities. Theft

McDaniel, Patrick Drew

247

An Infrastructure for Adaptive Dynamic Optimization  

E-Print Network [OSTI]

An Infrastructure for Adaptive Dynamic Optimization Derek Bruening, Timothy Garnett, and Saman,timothyg,saman}@lcs.mit.edu Abstract Dynamic optimization is emerging as a promising ap- proach to overcome many of the obstacles static optimizations, there are very few for developing dynamic optimizations. We present a framework

Amarasinghe, Saman

248

Polish grid infrastructure for science and research  

E-Print Network [OSTI]

Structure, functionality, parameters and organization of the computing Grid in Poland is described, mainly from the perspective of high-energy particle physics community, currently its largest consumer and developer. It represents distributed Tier-2 in the worldwide Grid infrastructure. It also provides services and resources for data-intensive applications in other sciences.

Ryszard Gokieli; Krzysztof Nawrocki; Adam Padee; Dorota Stojda; Karol Wawrzyniak; Wojciech Wislicki

2007-10-07T23:59:59.000Z

249

APS1031 Infrastructure Planning University of Toronto  

E-Print Network [OSTI]

-requisite of sustainable development, and we look at how resilience can be built into our infrastructure plan. With case development policy? While each is a specialist area of practice, all have a basis in strategic planning to manage the financing and design processes. As the UN observed, resilience is the pre

Toronto, University of

250

Framework for Improving Critical Infrastructure Cybersecurity  

E-Print Network [OSTI]

Framework for Improving Critical Infrastructure Cybersecurity Version 1.0 National Institute of Standards and Technology February 12, 2014 #12;February 12, 2014 Cybersecurity Framework Version 1.0 Table............................................................................................................. 20 ii #12;February 12, 2014 Cybersecurity Framework Version 1.0 Executive Summary The national

251

Controlled Hydrogen Fleet and Infrastructure Analysis (Presentation)  

SciTech Connect (OSTI)

This is a presentation about the Fuel Cell Electric Vehicle Learning Demo, a 7-year project and the largest single FCEV and infrastructure demonstration in the world to date. Information such as its approach, technical accomplishments and progress; collaborations and future work are discussed.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Ainscough, C.; Saur, G.

2012-05-01T23:59:59.000Z

252

Analysis of heat pumps installed in family housing at Hunter Army Air Field  

SciTech Connect (OSTI)

The US Army Forces Command (FORSCOM) tasked Pacific Northwest Laboratory (PNL) in support of the US Department of Energy (DOE) Federal Energy Management Program (FEMP) to conduct a postconstruction evaluation of the air-source heat pumps installed in family housing at Hunter Army Air Field (AAF). The objective of this project was to investigate and resolve concerns about an increase in energy costs at Hunter AAF following the installation of heat pumps in November 1992. After completing several analyses and a field inspection of the heat pumps in family housing at Hunter AAF, the following conclusions were made: the installation of air-source heat pumps reduced the annual energy cost in family housing by $46,672 in 1993; the heat pump thermostat controls in Hunter AAF family housing appear to be incorrectly installed; and the Hunter AAF electric utility bill increased 10% during the first 6 months of 1993 compared to the first 6 months of 1992.

Parker, S.A.

1994-08-01T23:59:59.000Z

253

Lepech Sustainable Precast Infrastructure 2 Sustainable Design and Manufacturing of Prefabricated Durable Infrastructure  

E-Print Network [OSTI]

Lepech Sustainable Precast Infrastructure 2 Sustainable Design and Manufacturing of Prefabricated prefabrication and construction technologies, the environmental impacts of adopting "green" construction of such disadvantages, the cement and concrete product manufacturing industry remains vital to the US economy along

Lepech, Michael D.

254

Natural Gas Infrastructure R&D and Methane Emissions Mitigation...  

Broader source: Energy.gov (indexed) [DOE]

Natural Gas Infrastructure R&D and Methane Emissions Mitigation Workshop Natural Gas Infrastructure R&D and Methane Emissions Mitigation Workshop November 12, 2014 11:00AM EST to...

255

Status Report on Protected Domains for Cyber Infrastructure Management  

E-Print Network [OSTI]

through the use of distributed, highly secure, protected domains. Instead of creating a costly physically, Network Security, Information Assurance 1 Introduction Currently, our national cyber infrastructure to the President for Cyber Space Security and Chairman, President's Critical Infrastructure Protection Board

Irvine, Cynthia E.

256

Europe's liquid commons : towards a public territorial infrastructure  

E-Print Network [OSTI]

'his thesis examines the possibility of using intermodal logistics infrastructure on the Rhine-Danube waterway, as part of the Trans European Infrastructure Network, as a means to create a symbolic and operative commons ...

De Vries, Christoper (Christoper Hendrick John)

2011-01-01T23:59:59.000Z

257

S E R I E S SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES  

E-Print Network [OSTI]

civilization documentary, economic, social and even political or spiritual value #12;SEISMIC ENGINEERINGS E R I E S SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES COMMISSION of Research Infrastructures in Performance-based Earthquake Engineering Shaking table testing of models

258

Infrastructure for large-scale tests in marine autonomy  

E-Print Network [OSTI]

This thesis focuses on the development of infrastructure for research with large-scale autonomous marine vehicle fleets and the design of sampling trajectories for compressive sensing (CS). The newly developed infrastructure ...

Hummel, Robert A. (Robert Andrew)

2012-01-01T23:59:59.000Z

259

NIST Roadmap for Improving Critical Infrastructure Cybersecurity February 12, 2014  

E-Print Network [OSTI]

NIST Roadmap for Improving Critical Infrastructure Cybersecurity February 12, 2014 1. Introduction This companion Roadmap to the Framework for Improving Critical Infrastructure Cybersecurity ("the Framework, which has been moved to this document. 2. Evolution of the Cybersecurity Framework Since

260

Built Systems and Other Infrastructure Webinar | Department of...  

Energy Savers [EERE]

Built Systems and Other Infrastructure Webinar Built Systems and Other Infrastructure Webinar April 10, 2014 5:00PM to 6:30PM EDT The federal government, state governments, and...

Note: This page contains sample records for the topic "infrastructure evaluation installation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

16.Feb.2005 MC meeting, LBNL 1 CERN infrastructureCERN infrastructure  

E-Print Network [OSTI]

16.Feb.2005 MC meeting, LBNL 1 CERN infrastructureCERN infrastructure A.FabichA.Fabich, CERN AB://cern.ch/projhttp://cern.ch/proj--hiptargethiptarget #12;16.Feb.2005 MC meeting, LBNL 2 Experimental requirementsExperimental requirements What CERN couldSupport on installationinstallation CryogenicsCryogenics solenoid powersolenoid power SafetySafety #12;16.Feb.2005 MC meeting, LBNL 3

McDonald, Kirk

262

Manuel pour installer une station sismologique OSIRIS  

E-Print Network [OSTI]

installation Tout d'abord, enterrer le sismom`etre, s'assurer de l'horizontalit´e du sismo c'est-`a-dire, bulle le c^able sur le sismo, v´erifier de nouveau l'horizontalit´e. GPS Batterie ` Station d "sismo" puis cd osiris puis ./nrtd -set eth0 #12;7- Lancer Firefox (web browser) depuis la barre de menu

Perrot, Julie

263

Infrastructure Security EXCEPTIONAL SERVICE IN THE NATIONAL INTEREST  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

PRA research and analysis expertise including national infrastructure, transportation, health care, agriculture, and, of course, nuclear power and national defense....

264

Bill, Waugama, Smart Power Infrastructure Demonstration for Energy...  

Broader source: Energy.gov (indexed) [DOE]

cost SPIDERS primary objective is mission assurance Page-4 SPIDERS Program Summary CAMP SMITH ENERGY ISLAND * Entire Installation Smart Microgrid * Islanded Installation * High...

265

Impact of Natural Gas Infrastructure on Electric Power Systems  

E-Print Network [OSTI]

Impact of Natural Gas Infrastructure on Electric Power Systems MOHAMMAD SHAHIDEHPOUR, FELLOW, IEEE of electricity has introduced new risks associated with the security of natural gas infrastructure on a sig the essence of the natural gas infrastructure for sup- plying the ever-increasing number of gas-powered units

Fu, Yong

266

Copyright 2009 200916 Sustainable Design and Manufacturing of Precast Infrastructure  

E-Print Network [OSTI]

­ Sustainable Design and Manufacturing of Precast Infrastructure CIFE TAC 2009 Research Tasks · Green ECC 200916 ­ Sustainable Design and Manufacturing of Precast Infrastructure CIFE TAC 2009 Green ECC MaterialsCopyright © 2009 200916 ­ Sustainable Design and Manufacturing of Precast Infrastructure CIFE TAC

Lepech, Michael D.

267

Microsoft's Cloud Infrastructure Datacenters and Network Fact Sheet  

E-Print Network [OSTI]

Microsoft's Cloud Infrastructure Datacenters and Network Fact Sheet November 2014 Who we infrastructure composed of more than 100 globally distributed datacenters, edge computing nodes, and service every facet of the infrastructure. Since opening our first datacenter in 1989, we have invested more

Chaudhuri, Surajit

268

NETL F 451.1-1/1 Categorical Exclusion (CX) Designation Form  

Broader source: Energy.gov (indexed) [DOE]

10012009-09302013 San Francisco, CA Electric Drive Vehicle Demonstration and Infrastructure Evaluation Installation of chargers and demonstrations of an EV infrastructure in...

269

NETL F 451.1-1/1 Categorical Exclusion (CX) Designation Form  

Broader source: Energy.gov (indexed) [DOE]

04302010-09302013 Los Angeles, CA Electric Drive Vehicle Demonstration and Infrastructure Evaluation Installation of chargers and demonstrations of an EV infrastructure in the...

270

CU-ICAR Hydrogen Infrastructure Final Report  

SciTech Connect (OSTI)

The goal of this project was to establish an innovation center to accelerate the transition to a 'hydrogen economy' an infrastructure of vehicles, fuel resources, and maintenance capabilities based on hydrogen as the primary energy carrier. The specific objectives of the proposed project were to: (a) define the essential attributes of the innovation center; (b) validate the concept with potential partners; (c) create an implementation plan; and (d) establish a pilot center and demonstrate its benefits via a series of small scale projects.

Robert Leitner; David Bodde; Dennis Wiese; John Skardon; Bethany Carter

2011-09-28T23:59:59.000Z

271

Obtaining Disaster Assistance for Public Infrastructure  

E-Print Network [OSTI]

?s Divi- sion of Emergency Management. FEMA will communicate with local governments about the process of ap- plying under its Public Assistance Program. The information also is found on the FEMA Web site http://www.fema.gov/rrr/pa/. Eligible applicants... Public Assistance pro- gram, the FEMA Hazard Mitigation Grant Program (HMGP), and other aid programs. USDA Rural Development assistance for water infrastructure may be available through Emer- gency Community Water Assistance Grants. http://www.usda.gov...

Taylor, Greg

2005-10-10T23:59:59.000Z

272

"Mapping" Nonprofit Infrastructure Organizations in Texas  

E-Print Network [OSTI]

?Mapping? Nonprofit Infrastructure Organizations in Texas The Bush School of Government and Public Service Capstone Seminar Research by graduate students in the MPSA program (Andrea Aho... Service Texas A & M University December 2010 Page 1 What is Capstone? Capstone research courses at The George Bush School of Government and Public Service at Texas A&M University are completed in lieu of a master‘s thesis project...

Aho, Andrea; Harris, Amanda; Kessel, Kendall; Park, Jongsoo; Park, Jong Taek; Rios, Lisa; Swendig, Brett

2010-01-01T23:59:59.000Z

273

NGNP Infrastructure Readiness Assessment: Consolidation Report  

SciTech Connect (OSTI)

The Next Generation Nuclear Plant (NGNP) project supports the development, demonstration, and deployment of high temperature gas-cooled reactors (HTGRs). The NGNP project is being reviewed by the Nuclear Energy Advisory Council (NEAC) to provide input to the DOE, who will make a recommendation to the Secretary of Energy, whether or not to continue with Phase 2 of the NGNP project. The NEAC review will be based on, in part, the infrastructure readiness assessment, which is an assessment of industry's current ability to provide specified components for the FOAK NGNP, meet quality assurance requirements, transport components, have the necessary workforce in place, and have the necessary construction capabilities. AREVA and Westinghouse were contracted to perform independent assessments of industry's capabilities because of their experience with nuclear supply chains, which is a result of their experiences with the EPR and AP-1000 reactors. Both vendors produced infrastructure readiness assessment reports that identified key components and categorized these components into three groups based on their ability to be deployed in the FOAK plant. The NGNP project has several programs that are developing key components and capabilities. For these components, the NGNP project have provided input to properly assess the infrastructure readiness for these components.

Brian K Castle

2011-02-01T23:59:59.000Z

274

Safety, codes and standards for hydrogen installations :  

SciTech Connect (OSTI)

Automakers and fuel providers have made public commitments to commercialize light duty fuel cell electric vehicles and fueling infrastructure in select US regions beginning in 2014. The development, implementation, and advancement of meaningful codes and standards is critical to enable the effective deployment of clean and efficient fuel cell and hydrogen solutions in the energy technology marketplace. Metrics pertaining to the development and implementation of safety knowledge, codes, and standards are important to communicate progress and inform future R&D investments. This document describes the development and benchmarking of metrics specific to the development of hydrogen specific codes relevant for hydrogen refueling stations. These metrics will be most useful as the hydrogen fuel market transitions from pre-commercial to early-commercial phases. The target regions in California will serve as benchmarking case studies to quantify the success of past investments in research and development supporting safety codes and standards R&D.

Harris, Aaron P.; Dedrick, Daniel E.; LaFleur, Angela Christine; San Marchi, Christopher W.

2014-04-01T23:59:59.000Z

275

File:Install.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublicIDAPowerPlantSitingConstruction.pdf JumpApschem.pdf Jumptight-gas.pdfFut gaspHIak.pdfwy.pdf JumpInstall.pdf

276

Installed Geothermal Capacity | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat JumpInc Place: Eden Prairie,InfieldInstalled Geothermal Capacity Jump to:

277

Helping Ensure High-Quality Installation of Solar Power Technologies...  

Energy Savers [EERE]

Ensure High-Quality Installation of Solar Power Technologies Helping Ensure High-Quality Installation of Solar Power Technologies April 15, 2013 - 12:00am Addthis The Midwest...

278

Solar Industry At Work: Streamlining Home Solar Installation...  

Broader source: Energy.gov (indexed) [DOE]

Solar Industry At Work: Streamlining Home Solar Installation Solar Industry At Work: Streamlining Home Solar Installation June 12, 2012 - 11:59am Addthis Sunrun is a home solar...

279

ARRA Program Celebrates Milestone 600,000 Smart Meter Installations...  

Broader source: Energy.gov (indexed) [DOE]

ARRA Program Celebrates Milestone 600,000 Smart Meter Installations ARRA Program Celebrates Milestone 600,000 Smart Meter Installations April 17, 2012 - 3:09pm Addthis On April 11,...

280

Net Zero Energy Military Installations: A Guide to Assessment...  

Broader source: Energy.gov (indexed) [DOE]

Net Zero Energy Military Installations: A Guide to Assessment and Planning Net Zero Energy Military Installations: A Guide to Assessment and Planning In 2008, DoD and DOE defined a...

Note: This page contains sample records for the topic "infrastructure evaluation installation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

PNNL Reports Distributed Wind Installations Down, Exports Up...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

PNNL Reports Distributed Wind Installations Down, Exports Up in 2013 PNNL Reports Distributed Wind Installations Down, Exports Up in 2013 March 31, 2014 - 11:14am Addthis According...

282

Pasadena Water and Power- Solar Power Installation Rebate  

Broader source: Energy.gov [DOE]

Pasadena Water and Power (PWP) offers its electric customers a rebate for photovoltaic (PV) installations, with a goal of helping to fund the installation of 14 megawatts (MW) of solar power by...

283

Portland Advancing Green Image With Solar Installs | Department...  

Broader source: Energy.gov (indexed) [DOE]

Portland Advancing Green Image With Solar Installs Portland Advancing Green Image With Solar Installs February 22, 2010 - 12:10pm Addthis Laura Smoyer checks the net-metering...

284

Energy Saving "Cool Roofs" Installed at Y-12 | National Nuclear...  

National Nuclear Security Administration (NNSA)

Home Field Offices Welcome to the NNSA Production Office NPO News Releases Energy Saving "Cool Roofs" Installed at Y-12 Energy Saving "Cool Roofs" Installed at Y-12 The...

285

Energy Saving 'Cool Roofs' Installed at Y-12 | National Nuclear...  

National Nuclear Security Administration (NNSA)

Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at NNSA Blog Home NNSA Blog Energy Saving 'Cool Roofs' Installed at Y-12 Energy Saving 'Cool Roofs' Installed at Y-12...

286

Energy Department Launches SunShot Prize Competition to Install...  

Broader source: Energy.gov (indexed) [DOE]

SunShot Prize Competition to Install Solar Energy Systems at a Fraction of Today's Price Energy Department Launches SunShot Prize Competition to Install Solar Energy Systems at a...

287

Secretary Chu Announces Two Million Smart Grid Meters Installed...  

Energy Savers [EERE]

Two Million Smart Grid Meters Installed Nationwide Secretary Chu Announces Two Million Smart Grid Meters Installed Nationwide August 31, 2010 - 12:00am Addthis Columbus, OH - At an...

288

Evaluation of Natural Gas Pipeline Materials and Infrastructure for  

E-Print Network [OSTI]

South Carolina Electric and Gas University of South Carolina Praxair Hydrogen Pipeline Working Group

289

Vehicle and Infrastructure Cash-Flow Evaluation (VICE) | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov PtyInformation UCOpen Energy InformationVashon,VectronInformation

290

Electric Drive Vehicle Demonstration and Vehicle Infrastructure Evaluation  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat PumpRecord ofESPC ENABLE: ECM Summary ECMWeartheEfficientlyInc.| Department of

291

Electric Drive Vehicle Demonstration and Vehicle Infrastructure Evaluation  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat PumpRecord ofESPC ENABLE: ECM Summary ECMWeartheEfficientlyInc.| Department of|

292

Electric Drive Vehicle Demonstration and Vehicle Infrastructure Evaluation  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat PumpRecord ofESPC ENABLE: ECM Summary ECMWeartheEfficientlyInc.| Department of||

293

Large-Scale Molecular Dynamics Simulations for Highly Parallel Infrastructures  

E-Print Network [OSTI]

Computational chemistry allows researchers to experiment in sillico: by running a computer simulations of a biological or chemical processes of interest. Molecular dynamics with molecular mechanics model of interactions simulates N-body problem of atoms$-$it computes movements of atoms according to Newtonian physics and empirical descriptions of atomic electrostatic interactions. These simulations require high performance computing resources, as evaluations within each step are computationally demanding and billions of steps are needed to reach interesting timescales. Current methods decompose the spatial domain of the problem and calculate on parallel/distributed infrastructures. Even the methods with the highest strong scaling hit the limit at half a million cores: they are not able to cut the time to result if provided with more processors. At the dawn of exascale computing with massively parallel computational resources, we want to increase the level of parallelism by incorporating parallel-in-time comput...

Pazúriková, Jana

2014-01-01T23:59:59.000Z

294

Earthquake warning system for infrastructures : a scoping analysis.  

SciTech Connect (OSTI)

This report provides the results of a scoping study evaluating the potential risk reduction value of a hypothetical, earthquake early-warning system. The study was based on an analysis of the actions that could be taken to reduce risks to population and infrastructures, how much time would be required to take each action and the potential consequences of false alarms given the nature of the action. The results of the scoping analysis indicate that risks could be reduced through improving existing event notification systems and individual responses to the notification; and production and utilization of more detailed risk maps for local planning. Detailed maps and training programs, based on existing knowledge of geologic conditions and processes, would reduce uncertainty in the consequence portion of the risk analysis. Uncertainties in the timing, magnitude and location of earthquakes and the potential impacts of false alarms will present major challenges to the value of an early-warning system.

Brodsky, Nancy S.; O'Connor, Sharon L.; Stamber, Kevin Louis; Kelic, Andjelka; Fogleman, William E. (GRIT, Inc., Albuquerque, NM); Vugrin, Eric D.; Corbet, Thomas Frank, Jr.; Brown, Theresa Jean

2011-09-01T23:59:59.000Z

295

NREL Job Task Analysis: Retrofit Installer Technician (Revised)  

SciTech Connect (OSTI)

A summary of job task analyses for the position of retrofit installer technician when conducting weatherization work on a residence.

Kurnik, C.; Woodley, C.

2012-04-01T23:59:59.000Z

296

RMP Standard PreInstalled Software Page 1 of 2  

E-Print Network [OSTI]

RMP Standard PreInstalled Software Page 1 of 2 Standard Software PreInstalled with RMP Windows@lmu.edu or 310-338-7777 RMP Standard PreInstalled Software Page 2 of 2 · Photo Booth EndNote Apple DVD Player

Dahlquist, Kam D.

297

A GUIDE TO PHOTOVOLTAIC (PV) SYSTEM DESIGN AND INSTALLATION  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION A GUIDE TO PHOTOVOLTAIC (PV) SYSTEM DESIGN AND INSTALLATION JUNE 2001 TO PHOTOVOLTAIC (PV) SYSTEM DESIGN AND INSTALLATION Prepared for: California Energy Commission Energy Technology installing photovoltaic (PV) systems under the Emerging Renewables Buydown Program. This is the first

298

IBM Systems Director Active Energy Manager Installation and User's Guide  

E-Print Network [OSTI]

IBM Systems Director Active Energy Manager Installation and User's Guide Version 4.3 #12;#12;IBM Systems Director Active Energy Manager Installation and User's Guide Version 4.3 #12;ii IBM Systems Director Active Energy Manager: Installation and User's Guide #12;About this book This book provides

299

Natural Gas and Hydrogen Infrastructure Opportunities Workshop, October 18-19, 2011, Argonne National Laboratory, Argonne, IL : Summary Report.  

SciTech Connect (OSTI)

The overall objective of the Workshop was to identify opportunities for accelerating the use of both natural gas (NG) and hydrogen (H{sub 2}) as motor fuels and in stationary power applications. Specific objectives of the Workshop were to: (1) Convene industry and other stakeholders to share current status/state-of-the-art of NG and H{sub 2} infrastructure; (2) Identify key challenges (including non-technical challenges, such as permitting, installation, codes, and standards) preventing or delaying the widespread deployment of NG and H{sub 2} infrastructure. Identify synergies between NG and H{sub 2} fuels; and (3) Identify and prioritize opportunities for addressing the challenges identified above, and determine roles and opportunities for both the government and industry stakeholders. Plenary speakers and panel discussions summarized the current status of the NG and H{sub 2} infrastructure, technology for their use in transportation and stationary applications, and some of the major challenges and opportunities to more widespread use of these fuels. Two break-out sessions of three groups each addressed focus questions on: (1) infrastructure development needs; (2) deployment synergies; (3) natural gas and fuel cell vehicles (NGVs, FCVs), specialty vehicles, and heavy-duty trucks; (4) CHP (combined heat and power), CHHP (combined hydrogen, heat, and power), and synergistic approaches; and (5) alternative uses of natural gas.

Kumar, R. comp.; Ahmed, S. comp. (Chemical Sciences and Engineering Division)

2012-02-21T23:59:59.000Z

300

HIGHWAY INFRASTRUCTURE FOCUS AREA NEXT-GENERATION INFRASTRUCTURE MATERIALS VOLUME I - TECHNICAL PROPOSAL & MANAGEMENTENHANCEMENT OF TRANSPORTATION INFRASTRUCTURE WITH IRON-BASED AMORPHOUS-METAL AND CERAMIC COATINGS  

SciTech Connect (OSTI)

The infrastructure for transportation in the United States allows for a high level of mobility and freight activity for the current population of 300 million residents, and several million business establishments. According to a Department of Transportation study, more than 230 million motor vehicles, ships, airplanes, and railroads cars were used on 6.4 million kilometers (4 million miles) of highways, railroads, airports, and waterways in 1998. Pipelines and storage tanks were considered to be part of this deteriorating infrastructure. The annual direct cost of corrosion in the infrastructure category was estimated to be approximately $22.6 billion in 1998. There were 583,000 bridges in the United States in 1998. Of this total, 200,000 bridges were steel, 235,000 were conventional reinforced concrete, 108,000 bridges were constructed using pre-stressed concrete, and the balance was made using other materials of construction. Approximately 15 percent of the bridges accounted for at this point in time were structurally deficient, primarily due to corrosion of steel and steel reinforcement. Iron-based amorphous metals, including SAM2X5 (Fe{sub 49.7}Cr{sub 17.7}Mn{sub 1.9}Mo{sub 7.4}W{sub 1.6}B{sub 15.2}C{sub 3.8}Si{sub 2.4}) and SAM1651 (Fe{sub 48}Mo{sub 14}Cr{sub 15}Y{sub 2}C{sub 15}B{sub 6}) have been developed, and have very good corrosion resistance. These materials have been prepared as a melt-spun ribbons, as well as gas atomized powders and thermal-spray coatings. During electrochemical testing in several environments, including seawater at 90 C, the passive film stabilities of these materials were found to be comparable to that of more expensive high-performance alloys, based on electrochemical measurements of the passive film breakdown potential and general corrosion rates. These materials also performed very well in standard salt fog tests. Chromium (Cr), molybdenum (Mo) and tungsten (W) provided corrosion resistance, and boron (B) enabled glass formation. The high boron content of this particular amorphous metal made it an effective neutron absorber, and suitable for criticality control applications. These amorphous alloys appear to maintain their corrosion resistance up to the glass transition temperature. Visionary research is proposed to extend the application of corrosion-resistant iron-based amorphous metal coatings, and variants of these coatings, to protection of the Nation's transportation infrastructure. Specific objectives of the proposed work are: (1) fabrication of appropriate test samples for evaluation of concept; (2) collection of production and test data for coated steel reinforcement bars, enabling systematic comparison of various coating options, based upon performance and economic considerations; and (3) construction and testing of concrete structures with coated steel reinforcement bars, thereby demonstrating the value of amorphous-metal coatings. The benefits of ceramic coatings as thermal barriers will also be addressed.

Farmer, J C

2007-12-04T23:59:59.000Z

Note: This page contains sample records for the topic "infrastructure evaluation installation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Toward Developing Genetic Algorithms to Aid in Critical Infrastructure Modeling  

SciTech Connect (OSTI)

Today’s society relies upon an array of complex national and international infrastructure networks such as transportation, telecommunication, financial and energy. Understanding these interdependencies is necessary in order to protect our critical infrastructure. The Critical Infrastructure Modeling System, CIMS©, examines the interrelationships between infrastructure networks. CIMS© development is sponsored by the National Security Division at the Idaho National Laboratory (INL) in its ongoing mission for providing critical infrastructure protection and preparedness. A genetic algorithm (GA) is an optimization technique based on Darwin’s theory of evolution. A GA can be coupled with CIMS© to search for optimum ways to protect infrastructure assets. This includes identifying optimum assets to enforce or protect, testing the addition of or change to infrastructure before implementation, or finding the optimum response to an emergency for response planning. This paper describes the addition of a GA to infrastructure modeling for infrastructure planning. It first introduces the CIMS© infrastructure modeling software used as the modeling engine to support the GA. Next, the GA techniques and parameters are defined. Then a test scenario illustrates the integration with CIMS© and the preliminary results.

Not Available

2007-05-01T23:59:59.000Z

302

Infrastructure: A technology battlefield in the 21st century  

SciTech Connect (OSTI)

A major part of technological advancement has involved the development of complex infrastructure systems, including electric power generation, transmission, and distribution networks; oil and gas pipeline systems; highway and rail networks; and telecommunication networks. Dependence on these infrastructure systems renders them attractive targets for conflict in the twenty-first century. Hostile governments, domestic and international terrorists, criminals, and mentally distressed individuals will inevitably find some part of the infrastructure an easy target for theft, for making political statements, for disruption of strategic activities, or for making a nuisance. The current situation regarding the vulnerability of the infrastructure can be summarized in three major points: (1) our dependence on technology has made our infrastructure more important and vital to our everyday lives, this in turn, makes us much more vulnerable to disruption in any infrastructure system; (2) technologies available for attacking infrastructure systems have changed substantially and have become much easier to obtain and use, easy accessibility to information on how to disrupt or destroy various infrastructure components means that almost anyone can be involved in this destructive process; (3) technologies for defending infrastructure systems and preventing damage have not kept pace with the capability for destroying such systems. A brief review of these points will illustrate the significance of infrastructure and the growing dangers to its various elements.

Drucker, H.

1997-12-31T23:59:59.000Z

303

Public key infrastructure for DOE security research  

SciTech Connect (OSTI)

This document summarizes the Department of Energy`s Second Joint Energy Research/Defence Programs Security Research Workshop. The workshop, built on the results of the first Joint Workshop which reviewed security requirements represented in a range of mission-critical ER and DP applications, discussed commonalties and differences in ER/DP requirements and approaches, and identified an integrated common set of security research priorities. One significant conclusion of the first workshop was that progress in a broad spectrum of DOE-relevant security problems and applications could best be addressed through public-key cryptography based systems, and therefore depended upon the existence of a robust, broadly deployed public-key infrastructure. Hence, public-key infrastructure ({open_quotes}PKI{close_quotes}) was adopted as a primary focus for the second workshop. The Second Joint Workshop covered a range of DOE security research and deployment efforts, as well as summaries of the state of the art in various areas relating to public-key technologies. Key findings were that a broad range of DOE applications can benefit from security architectures and technologies built on a robust, flexible, widely deployed public-key infrastructure; that there exists a collection of specific requirements for missing or undeveloped PKI functionality, together with a preliminary assessment of how these requirements can be met; that, while commercial developments can be expected to provide many relevant security technologies, there are important capabilities that commercial developments will not address, due to the unique scale, performance, diversity, distributed nature, and sensitivity of DOE applications; that DOE should encourage and support research activities intended to increase understanding of security technology requirements, and to develop critical components not forthcoming from other sources in a timely manner.

Aiken, R.; Foster, I.; Johnston, W.E. [and others

1997-06-01T23:59:59.000Z

304

Infrastructure, human resources, international cooperation, research and development, environment and health, societal issues, industrial innovation, Infrastructure, human resources, international cooperation, research and development, environment and hea  

E-Print Network [OSTI]

Infrastructure, human resources, international cooperation, research and development, environment and health, societal issues, industrial innovation, Infrastructure, human resources, international Infrastructure, human resources, international cooperation, research and development, environment and health

Zürich, Universität

305

Agenda: Energy Infrastructure Finance | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergy Cooperation |South ValleyASGovLtr.pdfAboutSheet,ProposedEnergy Infrastructure Finance

306

Agenda: Enhancing Energy Infrastructure Resiliency and Addressing  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergy Cooperation |South ValleyASGovLtr.pdfAboutSheet,ProposedEnergy Infrastructure

307

Agenda: INFRASTRUCTURE SITING | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergy Cooperation |South ValleyASGovLtr.pdfAboutSheet,ProposedEnergySITING Agenda: INFRASTRUCTURE

308

IPHE Infrastructure Workshop | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergy Health andof EnergyHydrogen-PoweredIDIQ DOETheIPHE Infrastructure

309

Sandia National Laboratories: Water Infrastructure Security  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1development Sandia, NREL Release Wave Energy ConverterEnvironmentWater Infrastructure

310

Maximizing the Value of Photovoltaic Installations on Schools in California: Choosing the Best Electricity Rates  

SciTech Connect (OSTI)

Schools in California often have a choice between multiple electricity rate options. For schools with photovoltaic (PV) installations, choosing the right rate is essential to maximize the value of PV generation. The rate option that minimizes a school?s electricity expenses often does not remain the most economical choice after the school installs a PV system. The complex interaction between PV generation, building load, and rate structure makes determining the best rate a challenging task. This report evaluates 22 rate structures across three of California?s largest electric utilities--Pacific Gas and Electric Co. (PG&E), Southern California Edison (SCE), and San Diego Gas and Electric (SDG&E)--in order to identify common rate structure attributes that are favorable to PV installations.

Ong, S.; Denholm, P.

2011-07-01T23:59:59.000Z

311

National Computational Infrastructure for Lattice Gauge Theory  

SciTech Connect (OSTI)

SciDAC-2 Project The Secret Life of Quarks: National Computational Infrastructure for Lattice Gauge Theory, from March 15, 2011 through March 14, 2012. The objective of this project is to construct the software needed to study quantum chromodynamics (QCD), the theory of the strong interactions of sub-atomic physics, and other strongly coupled gauge field theories anticipated to be of importance in the energy regime made accessible by the Large Hadron Collider (LHC). It builds upon the successful efforts of the SciDAC-1 project National Computational Infrastructure for Lattice Gauge Theory, in which a QCD Applications Programming Interface (QCD API) was developed that enables lattice gauge theorists to make effective use of a wide variety of massively parallel computers. This project serves the entire USQCD Collaboration, which consists of nearly all the high energy and nuclear physicists in the United States engaged in the numerical study of QCD and related strongly interacting quantum field theories. All software developed in it is publicly available, and can be downloaded from a link on the USQCD Collaboration web site, or directly from the github repositories with entrance linke http://usqcd-software.github.io

Brower, Richard C.

2014-04-15T23:59:59.000Z

312

Controlled Hydrogen Fleet and Infrastructure Analysis (2008 Presentation)  

SciTech Connect (OSTI)

This presentation by Keith Wipke at the 2008 DOE Hydrogen Program Annual Merit Review Meeting provides information about NREL's Controlled Hydrogen Fleet and Infrastructure Analysis Project.

Wipke, K.; Sprik, S.; Kurtz, J.

2008-06-10T23:59:59.000Z

313

"Insurance as a Risk Management Instrument for Energy Infrastructure...  

Broader source: Energy.gov (indexed) [DOE]

Resilience in Energy Infrastructure and Addressing Vulnerabilities Large Power Transformers and the U.S. Electric Grid Report Update (April 2014) "Large Power Transformers and...

314

Energy: Critical Infrastructure and Key Resources Sector-Specific...  

Broader source: Energy.gov (indexed) [DOE]

comprehensive risk management framework that defines critical infrastructure protection (CIP) roles and responsibilities for all levels of government, private industry, and other...

315

Infrastructure Analysis Tools: A Focus on Cash Flow Analysis (Presentation)  

SciTech Connect (OSTI)

NREL has developed and maintains a variety of infrastructure analysis models for the U.S. Department of Energy. Business case analysis has recently been added to this tool set. This presentation focuses on cash flow analysis. Cash flows depend upon infrastructure costs, optimized spatially and temporally, and assumptions about financing and revenue. NREL has incorporated detailed metrics on financing and incentives into the models. Next steps in modeling include continuing to collect feedback on regional/local infrastructure development activities and 'roadmap' dynamics, and incorporating consumer preference assumptions on infrastructure to provide direct feedback between vehicles and station rollout.

Melaina, M.; Penev, M.

2012-09-01T23:59:59.000Z

316

Deadline Extended for RFI Regarding Hydrogen Infrastructure and...  

Energy Savers [EERE]

for a robust market introduction of hydrogen supply, infrastructure, and fuel cell electric vehicles (FCEVs). This input will augment financing strategies that DOE...

317

Safety Hazard and Risk Identification and Management In Infrastructure Management   

E-Print Network [OSTI]

Infrastructure such as transportation networks improves the condition of everyday lives by facilitating public services and systems necessary for economic activity and growth. However, constructing and maintaining ...

Campbell, Jennifer Mary

2008-01-01T23:59:59.000Z

318

QER Public Meeting in Washington, DC: Enhancing Energy Infrastructure...  

Energy Savers [EERE]

the U.S. Department of Energy. Documents Available for Download Briefing Memo - Enhancing Energy Infrastructure Resiliency and Addressing Vulnerabilities Meeting Summary -...

319

Geographically-Based Hydrogen Demand & Infrastructure Rollout Scenario Analysis (Presentation)  

SciTech Connect (OSTI)

This presentation by Margo Melendez at the 2007 DOE Hydrogen Program Annual Merit Review Meeting provides information about NREL's Hydrogen Demand & Infrastructure Rollout Scenario Analysis.

Melendez, M.

2007-05-17T23:59:59.000Z

320

DOE Launches Natural Gas Infrastructure R&D Program Enhancing...  

Office of Environmental Management (EM)

DOE Launches Natural Gas Infrastructure R&D Program Enhancing Pipeline and Distribution System Operational Efficiency, Reducing Methane Emissions DOE Launches Natural Gas...

Note: This page contains sample records for the topic "infrastructure evaluation installation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Comparing the Impacts of Northeast Hurricanes on Energy Infrastructure...  

Energy Savers [EERE]

2 years, devastating coastal communities and causing widespread impacts to the region's energy infrastructure, supply, and markets. Although Sandy was weaker than Irene at...

322

FROM: KYLE E. MCSLARROW SUBJEcr A Single Integrated IT Infrastructure...  

Broader source: Energy.gov (indexed) [DOE]

KYLE E. MCSLARROW SUBJEcr A Single Integrated IT Infrastructure for the Department The Department has made great progress in achieving efficiencies and economies of scale in...

323

Webinar November 18: An Overview of the Hydrogen Fueling Infrastructur...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Related Articles DOE Announces Webinars on Hydrogen Fueling Infrastructure Technology, Energy Efficiency and Conservation Loan Program, and More DOE Announces Webinars on Best...

324

Interoperable simulation gaming for strategic infrastructure systems design  

E-Print Network [OSTI]

Infrastructure systems are large physical networks of interrelated components which produce and distribute resources to meet societal needs. Meeting future sustainability objectives may require more complex systems with ...

Grogan, Paul Thomas, 1985-

2014-01-01T23:59:59.000Z

325

Managing Critical Infrastructures C.I.M. Suite  

ScienceCinema (OSTI)

protect infrastructure during natural disasters, terrorist attacks and electrical outages. For more information about INL research, visit http://www.facebook.com/idahonationallaboratory.

None

2013-05-28T23:59:59.000Z

326

Reducing Cyber Risk to Critical Infrastructure: NIST Framework...  

Broader source: Energy.gov (indexed) [DOE]

the President under Executive Order (EO) 13636 "Improving Critical Infrastructure Cybersecurity" of February 2013 directed the National Institute of Standards and Technology...

327

Engaging Non-IT Executives in IT Infrastructure Decisions  

E-Print Network [OSTI]

This case study describes how information technology (IT) managers from Insurance Co. successfully engaged non-IT executives in IT infrastructure investment decisions. This

Fonstad, Nils O.

2008-07-01T23:59:59.000Z

328

AVTA: EVSE Testing- NYSERDA Electric Vehicle Charging Infrastructure Reports  

Broader source: Energy.gov [DOE]

These reports describe the charging patterns of drivers participating in the New York State Energy Research and Development Authority's (NYSERDA) electric vehicle (EV) infrastructure project.

329

Webinar: Creating a Green Infrastructure Plan to Transform Your Community  

Broader source: Energy.gov [DOE]

Green infrastructure approaches, such as incorporating trees and rain gardens into street designs, can help communities better manage stormwater while achieving other environmental, public health,...

330

Microsoft Word - 20140415 Infrastructure Constraints in New England...  

Broader source: Energy.gov (indexed) [DOE]

as well as decarbonizing New England's energy supply? * To what extent can electric demand-side management (DSM) reduce the need for additional infrastructure? * What are the...

331

Potential Role of Exergy in Analysis of Hydrogen Infrastructure  

SciTech Connect (OSTI)

The objective of this paper is to demonstrate the potential role of exergy (second-law) analysis, as a complementary tool for economic assessments of hydrogen infrastructures.

Jalalzadeh-Azar, A. A.

2008-01-01T23:59:59.000Z

332

Building the national health information infrastructure for personal health, health care services, public health, and research  

E-Print Network [OSTI]

Professor of Health Management, Cambridge University Health, Judge Institute of Management, University of Cambridge and 2Department of Health Evaluation Sciences, University of Virginia, USA Email: Don E Detmer* - d.detmer@jims.cam.ac.uk * Corresponding... ral BMC Medical Informatics and ssBioMed CentDecision Making Open AcceDebate Building the national health information infrastructure for personal health, health care services, public health, and research Don E Detmer*1,2 Address: 1Dennis Gillings...

Detmer, Don E

2003-01-06T23:59:59.000Z

333

Safety of Hydrogen Systems Installed in Outdoor Enclosures  

SciTech Connect (OSTI)

The Hydrogen Safety Panel brings a broad cross-section of expertise from the industrial, government, and academic sectors to help advise the U.S. Department of Energy’s (DOE) Fuel Cell Technologies Office through its work in hydrogen safety, codes, and standards. The Panel’s initiatives in reviewing safety plans, conducting safety evaluations, identifying safety-related technical data gaps, and supporting safety knowledge tools and databases cover the gamut from research and development to demonstration and deployment. The Panel’s recent work has focused on the safe deployment of hydrogen and fuel cell systems in support of DOE efforts to accelerate fuel cell commercialization in early market applications: vehicle refueling, material handling equipment, backup power for warehouses and telecommunication sites, and portable power devices. This paper resulted from observations and considerations stemming from the Panel’s work on early market applications. This paper focuses on hydrogen system components that are installed in outdoor enclosures. These enclosures might alternatively be called “cabinets,” but for simplicity, they are all referred to as “enclosures” in this paper. These enclosures can provide a space where a flammable mixture of hydrogen and air might accumulate, creating the potential for a fire or explosion should an ignition occur. If the enclosure is large enough for a person to enter, and ventilation is inadequate, the hydrogen concentration could be high enough to asphyxiate a person who entered the space. Manufacturers, users, and government authorities rely on requirements described in codes to guide safe design and installation of such systems. Except for small enclosures used for hydrogen gas cylinders (gas cabinets), fuel cell power systems, and the enclosures that most people would describe as buildings, there are no hydrogen safety requirements for these enclosures, leaving gaps that must be addressed. This paper proposes that a technical basis be developed to enable code bodies to write requirements for the range of enclosures from the smallest to the largest.

Barilo, Nick F.

2013-11-06T23:59:59.000Z

334

Page 1 of 6 Installation Name ____________________________________________________________  

E-Print Network [OSTI]

to facilitate the performance of an oil-water treatment system used to separate oils and greases from wastewater in the evaluation team for the oil-water separation treatment system. Process Engineer (site visit, treatment system evaluation) Cost Engineer (cost of alternatives) 2) Typical Treatment Objectives Oil-water

US Army Corps of Engineers

335

TECHNOLOGIES TO ENHANCE THE OPERATION OF EXISTING NATURAL GAS COMPRESSION INFRASTRUCTURE  

SciTech Connect (OSTI)

This quarterly report documents work performed under Tasks 15, 16, and 18 through 23 of the project entitled: ''Technologies to Enhance the Operation of Existing Natural Gas Compression Infrastructure''. The project objective is to develop and substantiate methods for operating integral engine/compressors in gas pipeline service, which reduce fuel consumption, increase capacity, and enhance mechanical integrity. The report first documents a survey site test performed on a TCVC10 engine/compressor installed at Dominion's Groveport Compressor Station. This test completes planned screening efforts designed to guide selection of one or more units for design analysis and testing with emphasis on identification and reduction of compressor losses. The report further presents the validation of the simulation model for the Air Balance tasks and outline of conceptual manifold designs.

Anthony J. Smalley; Ralph E. Harris; Gary D. Bourn; Danny M. Deffenbaugh

2005-07-27T23:59:59.000Z

336

TECHNOLOGIES TO ENHANCE THE OPERATION OF EXISTING NATURAL GAS COMPESSION INFRASTRUCTURE  

SciTech Connect (OSTI)

This quarterly report documents work performed under Tasks 15, 16, and 18 through 23 of the project entitled: ''Technologies to Enhance the Operation of Existing Natural Gas Compression Infrastructure''. The project objective is to develop and substantiate methods for operating integral engine/compressors in gas pipeline service, which reduce fuel consumption, increase capacity, and enhance mechanical integrity. The report presents results of design analysis performed on the TCVC10 engine/compressor installed at Dominion's Groveport Compressor Station to develop options and guide decisions for reducing pulsations and enhancing compressor system efficiency and capacity. The report further presents progress on modifying and testing the laboratory GMVH6 at SwRI for correcting air imbalance.

Anthony J. Smalley; Ralph E. Harris; Gary D. Bourn; Danny M. Deffenbaugh

2006-01-24T23:59:59.000Z

337

The Hydrogen Infrastructure Transition Model (HIT) & Its Application in Optimizing a 50-year Hydrogen Infrastructure for Urban Beijing  

E-Print Network [OSTI]

Prospects for Building a Hydrogen Energy Infrastructure."A global survey of hydrogen energy research, development andof Engineering (2004). the Hydrogen Economy: Opportunities,

Lin, Zhenhong; Ogden, J; Fan, Yueyue; Sperling, Dan

2006-01-01T23:59:59.000Z

338

The Hydrogen Infrastructure Transition (HIT) Model and Its Application in Optimizing a 50-year Hydrogen Infrastructure for Urban Beijing  

E-Print Network [OSTI]

Prospects for Building a Hydrogen Energy Infrastructure."A global survey of hydrogen energy research, development andof Engineering (2004). the Hydrogen Economy: Opportunities,

Lin, Zhenhong; Ogden, Joan M; Fan, Yueyue; Sperling, Dan

2006-01-01T23:59:59.000Z

339

Installation considerations for IGBT AC drives  

SciTech Connect (OSTI)

In the last four years, Adjustable Speed ac Drive (ASD) manufacturers have migrated from Bipolar Junction Transistor (BJT) semiconductors to Insulated Gate Bipolar Transistors (IGBTs) as the preferred Output switching device. The advantage of IGBTs over BJTs is that device rise and fall time switching capability is 5 - 10 times faster, resulting in lower device switching loss and a more efficient drive. However, for a similar motor cable length as the BJT drive, the faster output voltage risetime of the IGBT drive may increase the dielectric voltage stress on the motor and cable due to a phenomenon called reflected wave. Faster output dv/dt transitions of IGBT drives also increase the possibility for phenomenon such as increased Common Mode (CM) electrical noise, Electromagnetic Interference (EMI) problems and increased capacitive cable charging current problems. Also, recent experience suggests any Pulse Width Modulated (PWM) drive with a steep fronted output voltage wave form may increase motor shaft voltage and lead to a bearing current phenomenon known as fluting. This paper provides a basic understanding of these issues, as well as solutions, to insure a successful drive system installation.

Skibinski, G.L.

1997-06-01T23:59:59.000Z

340

Gasket and snap ring installation tool  

DOE Patents [OSTI]

A tool for installing a gasket and a snap ring including a shaft, a first plate attached to the forward end of the shaft, a second plate slidably carried by the shaft, a spring disposed about the shaft between the first and second plates, and a sleeve that is free to slide over the shaft and engage the second plate. The first plate has a loading surface with a loading groove for receiving a snap ring and a shoulder for holding a gasket. A plurality of openings are formed through the first plate, communicating with the loading groove and approximately equally spaced about the groove. A plurality of rods are attached to the second plate, each rod slidable in one of the openings. In use, the loaded tool is inserted into a hollow pipe or pipe fitting having an internal flange and an internal seating groove, such that the gasket is positioned against the flange and the ring is in the approximate plane of the seating groove. The sleeve is pushed against the second plate, sliding the second plate towards the first plate, compressing the spring and sliding the rods forwards in the openings. The rods engage the snap ring and urge the ring from the loading groove into the seating groove.

Southerland, Jr., James M. (Aiken, SC); Barringer, Jr., Curtis N. (Orangeburg, SC)

1994-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "infrastructure evaluation installation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Installation package for a Sunspot Cascade Solar Water Heating System  

SciTech Connect (OSTI)

Elcam, Incorporated of Santa Barbara, California, has developed two solar water heating systems. The systems have been installed at Tempe, Arizona and San Diego, California. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank and controls. General guidelines are provided which may be utilized in development of detailed instalation plans and specifications. In addition, it provides instruction on operation, maintenance and installation of solar hot water systems.

None

1980-09-01T23:59:59.000Z

342

Utility Scale Renewable Energy Development Near DOD Installations...  

Broader source: Energy.gov (indexed) [DOE]

Aimone, P.E. National Security Global Business Battelle Memorial Institute Utility Scale Renewable Energy Development near DOD Installations Making the Case for Land Use...

343

Electric Vehicle Grid Integration for Sustainable Military Installations (Presentation)  

SciTech Connect (OSTI)

This presentation discusses electric vehicle grid integration for sustainable military installations. Fort Carson Military Reservation in Colorado Springs is used as a case study.

Simpson, M.

2011-05-05T23:59:59.000Z

344

Plug and Play: Purchase, Install, and Connect Residential Solar...  

Energy Savers [EERE]

roof mounting system, eliminating the need for racking systems. Once the lightweight solar panels are in place, the system then self-tests for proper installation and...

345

U.S. CHP Installations Incorporating Thermal Energy Storage ...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Company of Lisle, Illinois, for UT-Battelle, Oak Ridge National Laboratory. tictesdatabase.pdf More Documents & Publications Database (Report) of U.S. CHP Installations...

346

Pantex installs new meters to help to reduce energy consumption...  

National Nuclear Security Administration (NNSA)

installs new meters to help to reduce energy consumption | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile...

347

Project examples Install new HVAC, electrical, fire protection,  

E-Print Network [OSTI]

Project examples Install new HVAC, electrical, fire protection, and plumbing systems in Mechanical. · Totransformthisspaceandincreaseaccessibility, anelevatorisrequired.Currently,Blakelydoesnot haveone. Replace HVAC and electrical system

Blanchette, Robert A.

348

Rhode Island Stormwater Design and Installation Standards Manual (Rhode Island)  

Broader source: Energy.gov [DOE]

Rhode Island's stormwater design and installation standards manual has been developed to describe mandatory and suggested stormwater design and performance criteria for applicants to the Department...

349

Consider Installing High-Pressure Boilers with BackpressureTurbine...  

Broader source: Energy.gov (indexed) [DOE]

High-Pressure Boilers with Backpressure Turbine-Generators Consider Installing High-Pressure Boilers with Backpressure Turbine-Generators This tip sheet outlines the benefits of...

350

NMDOT Application for Permit to Install Utility Facilities Within...  

Open Energy Info (EERE)

Reference LibraryAdd to library Legal Document- OtherOther: NMDOT Application for Permit to Install Utility Facilities Within Public ROWLegal Published NA Year Signed or Took...

351

Microsoft Word - CX-Ashe-CGSFiberInstallation_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

5, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Debbie Ruckwardt Electrical Engineer - TEP-CSB-1 Proposed Action: Installing fiber optic cables between...

352

DOE-DOD Emergency Backup Power Fuel Cell Installations  

Fuel Cell Technologies Publication and Product Library (EERE)

Ths fact sheet describes a collaboration between the departments of Energy and Defense to install and operate 18 fuel cell backup power systems across the United States.

353

Permit for Charging Equipment Installation: Electric Vehicle Supply Equipment (EVSE)  

Broader source: Energy.gov [DOE]

Jurisdiction's can use this template to develop a standard permit for residential charging stations that allows for quick, safe installation of EVSE.

354

CATEGORICAL EXCLUSION TO INSTALL EMSL SUPER-COMPUTER POWER INFRASTRUCT...  

Broader source: Energy.gov (indexed) [DOE]

developing a Fee for Service agreement with the City of Richland to install a new transformer and high voltage switching yard from existing City electrical vaults capable of...

355

Innovations in Nuclear Infrastructure and Education  

SciTech Connect (OSTI)

The decision to implement the Innovation in Nuclear Infrastructure and Engineering Program (INIE) was an important first step towards ensuring that the United States preserves its worldwide leadership role in the field of nuclear science and engineering. Prior to INIE, university nuclear science and engineering programs were waning, undergraduate student enrollment was down, university research reactors were being shut down, while others faced the real possibility of closure. For too long, cutting edge research in the areas of nuclear medicine, neutron scattering, radiochemistry, and advanced materials was undervalued and therefore underfunded. The INIE program corrected this lapse in focus and direction and started the process of drawing a new blueprint with positive goals and objectives that supports existing as well the next generation of educators, students and researchers.

John Bernard

2010-12-13T23:59:59.000Z

356

Multi-vendor Penetration Testing in the Advanced Metering Infrastructure  

E-Print Network [OSTI]

Infrastructure (AMI) is changing the way electric energy is produced, priced, and consumed. The introduction,mcdaniel}@cse.psu.edu Abstract - The advanced metering infrastructure (AMI) is revolutionizing electrical grids. Intelligent AMI we develop an archetypal attack tree approach to guide penetration testing across multiple

McDaniel, Patrick Drew

357

IT infrastructure monitoring and management: Doing more with less  

E-Print Network [OSTI]

IT infrastructure monitoring and management: Doing more with less Highlights Remote managed to IT management ­ remote managed infrastructure services ­ that keeps control in the CIO's hands and frees up energy costs mean that your bills for powering and cooling servers threaten even the most well

358

Biofuel Supply Chain Infrastructure Optimizing the Evolution of Cellulosic Biofuel  

E-Print Network [OSTI]

Biofuel Supply Chain Infrastructure Optimizing the Evolution of Cellulosic Biofuel Center infrastructure. Cellulosic-based ad- vanced biofuel has a target of 21 billion gallons by 2022 and requires into a national economic model of biofuel sustainability. Cellulosic biomass relocates the demand

359

Utility and infrastructure needs for private tank waste processing  

SciTech Connect (OSTI)

This document supports the development of the Draft TWRS Privatization RFP. The document provides summaries of a wide variety of utility infrastructure and support services that are available at the Hanford Site. The needs of the privatization contractors are estimated and compared to the existing infrastructure. Recommendations are presented on the preferred and alternate routes of supplying the identifies requirements.

Reynolds, B.A.

1996-05-01T23:59:59.000Z

360

ORC2DSP: Compiler Infrastructure Supports for VLIW DSP Processors  

E-Print Network [OSTI]

ORC2DSP: Compiler Infrastructure Supports for VLIW DSP Processors Cheng-Wei Chen, Chung-Lin Tang our experiences in deploying ORC infrastructures for a novel 32-bit VLIW DSP processor (known as PAC. We also present methods in retargeting ORC compilers for PAC VLIW DSP processors. In addition

Lee, Jenq-Kuen

Note: This page contains sample records for the topic "infrastructure evaluation installation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

FINAL CONTENT SUBJECT TO CHANGE CONTROLLED HYDROGEN FLEET AND INFRASTRUCTURE  

E-Print Network [OSTI]

a strategy to develop a hydrogen economy that emphasizes co-developing hydrogen infrastructure in parallel in developing a path to a hydrogen economy. The Validation project will seek optimal system solutions to addressDRAFT FINAL CONTENT SUBJECT TO CHANGE CONTROLLED HYDROGEN FLEET AND INFRASTRUCTURE DEMONSTRATION

362

MODELING INFRASTRUCTURE FOR A FOSSIL HYDROGEN ENERGY SYSTEM  

E-Print Network [OSTI]

MODELING INFRASTRUCTURE FOR A FOSSIL HYDROGEN ENERGY SYSTEM WITH CO2 SEQUESTRATION Joan M. Ogden Production of hydrogen (H2) from fossil fuels with capture and sequestration of CO2 offers a route toward would require building two new pipeline infrastructures: one for distributing H2 to end-users and one

363

Seismic Engineering Research Infrastructures for European Synergies (SERIES)  

E-Print Network [OSTI]

Seismic Engineering Research Infrastructures for European Synergies (SERIES) M.N. Fardis University of Patras, Greece SUMMARY: Through the 4-year project SERIES (Seismic Engineering Research Infrastructures of their research. It also helps them to enhance their potential, by jointly developing novel seismic testing

364

S E R I E S SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES  

E-Print Network [OSTI]

S E R I E S SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES COMMISSION, In memory of Prof. Roy Severn #12;SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES · Project Framework · Experimental Campaign · Outcome Outline #12;SEISMIC ENGINEERING RESEARCH

365

Building Smart Ci2es & Smart Infrastructures Karl Henrik Johansson  

E-Print Network [OSTI]

11/3/11 1 Building Smart Ci2es & Smart Infrastructures Karl Henrik Johansson #12;11/3/11 2 Smart City Informa2on and Communica2on Technologies Why now Towards Smart Infrastructures Info Web Sensor Web Ac2on Web · Internet · WWW

Johansson, Karl Henrik

366

EL Program: Earthquake Risk Reduction in Buildings and Infrastructure  

E-Print Network [OSTI]

1 EL Program: Earthquake Risk Reduction in Buildings and Infrastructure Program Manager: John R. Hayes, Jr., 301 975 5640 Strategic Goal: Disaster-Resilient Buildings, Infrastructure, and Communities to earthquake engineering, including performance-based tools, guidelines, and standards for designing buildings

Magee, Joseph W.

367

Sustainability of Concrete forSustainability of Concrete for Infrastructure  

E-Print Network [OSTI]

Sustainability of Concrete forSustainability of Concrete for Infrastructure Dr. Jason H. Ideker limits sustainability in concrete materials? ­ Degradation: Alkali-silica reaction ­ Environmental for infrastructure rehabilitation and rapid repair ­ Instrumentation and monitoring to track performance · Testing

Bertini, Robert L.

368

SUSTAINABLE INFRASTRUCTURE MATERIAL DESIGN Michael D. Lepech1  

E-Print Network [OSTI]

SUSTAINABLE INFRASTRUCTURE MATERIAL DESIGN Michael D. Lepech1 , Victor C. Li1 , and Gregory A Engineering 2 Center for Sustainable Systems, School of Natural Resources and Environment University, sustainability has not been included in most infrastructure systems on any level. However, the engineering

Lepech, Michael D.

369

India Infrastructure Report 2010 Call-for-Papers  

E-Print Network [OSTI]

India Infrastructure Report 2010 Call-for-Papers We would like to invite you to contribute unpublished papers for consideration and publication in the forthcoming India Infrastructure Report (IIR) 2010, considered extremely useful by policy makers, receives wide publicity and provides an excellent forum

Srivastava, Kumar Vaibhav

370

CIMS: A FRAMEWORK FOR INFRASTRUCTURE INTERDEPENDENCY MODELING AND ANALYSIS  

SciTech Connect (OSTI)

Today’s society relies greatly upon an array of complex national and international infrastructure networks such as transportation, utilities, telecommunication, and even financial networks. While modeling and simulation tools have provided insight into the behavior of individual infrastructure networks, a far less understood area is that of the interrelationships among multiple infrastructure networks including the potential cascading effects that may result due to these interdependencies. This paper first describes infrastructure interdependencies as well as presenting a formalization of interdependency types. Next the paper describes a modeling and simulation framework called CIMS© and the work that is being conducted at the Idaho National Laboratory (INL) to model and simulate infrastructure interdependencies and the complex behaviors that can result.

Donald D. Dudenhoeffer; May R. Permann; Milos Manic

2006-12-01T23:59:59.000Z

371

Design and Installation of a Disposal Cell Cover Field Test  

SciTech Connect (OSTI)

The U.S. Department of Energy’s Office of Legacy Management (LM) initiated a cover assessment project in September 2007 to evaluate an inexpensive approach to enhancing the hydrological performance of final covers for disposal cells. The objective is to accelerate and enhance natural processes that are transforming existing conventional covers, which rely on low-conductivity earthen barriers, into water balance covers, that store water in soil and release it as soil evaporation and plant transpiration. A low conductivity cover could be modified by deliberately blending the upper layers of the cover profile and planting native shrubs. A test facility was constructed at the Grand Junction, Colorado, Disposal Site to evaluate the proposed methodology. The test cover was constructed in two identical sections, each including a large drainage lysimeter. The test cover was constructed with the same design and using the same materials as the existing disposal cell in order to allow for a direct comparison of performance. One test section will be renovated using the proposed method; the other is a control. LM is using the lysimeters to evaluate the effectiveness of the renovation treatment by monitoring hydrologic conditions within the cover profile as well as all water entering and leaving the system. This paper describes the historical experience of final covers employing earthen barrier layers, the design and operation of the lysimeter test facility, testing conducted to characterize the as-built engineering and edaphic properties of the lysimeter soils, the calibration of instruments installed at the test facility, and monitoring data collected since the lysimeters were constructed.

Benson, C.H. [University of Wisconsin–Madison, Madison, Wisconsin; Waugh, W.J. [S.M. Stoller Corporation, Grand Junction, Colorado; Albright, W.H. [Desert Research Institute, Reno, Nevada; Smith, G.M. [Geo-Smith Engineering, Grand Junction, Colorado; Bush, R.P. [U.S. Department of Energy, Grand Junction, Colorado

2011-02-27T23:59:59.000Z

372

Helping Policymakers Evaluate Distributed Wind Options | Department...  

Energy Savers [EERE]

and consumers evaluate the effectiveness of policies that promote distributed wind-wind turbines installed at homes, farms, and busi-nesses. Distributed wind allows Americans to...

373

Targeting Net Zero Energy for Military Installations (Presentation)  

SciTech Connect (OSTI)

Targeting Net Zero Energy for Military Installations in Kaneohe Bay, Hawaii. A net zero energy installation (NZEI) is one that produces as much energy from on-site renewable sources as it consumes. NZEI assessment provides a systematic approach to energy projects.

Burman, K.

2012-05-01T23:59:59.000Z

374

Wall Sculpture by Ellsworth Kelly Installed on Dartmouth Campus  

E-Print Network [OSTI]

Wall Sculpture by Ellsworth Kelly Installed on Dartmouth Campus Dartmouth Panels will be dedicated District, a wall sculpture by renowned abstract artist Ellsworth Kelly has been installed on the eastern façade of the Hopkins Center for the Arts, facing the Visual Arts Center. Kelly was in attendance

Shepherd, Simon

375

Establishing and Sustaining System Integrity via Root of Trust Installation  

E-Print Network [OSTI]

integrity. The TPM-based integrity measurement approaches are effective for measuring well-known, staticEstablishing and Sustaining System Integrity via Root of Trust Installation Abstract Integrity the management of a system's integrity, we propose a Root of Trust Installation (ROTI) as a foundation for high

McDaniel, Patrick Drew

376

Lessons Learned During HVAC Installation Dept. of Computer Science  

E-Print Network [OSTI]

Lessons Learned During HVAC Installation Ian Watson AI-CBR Dept. of Computer Science University of HVAC equipment. It has been developed as an adjunct to an existing system that uses case-based reasoning to reuse previous HVAC installation specifications and designs. The system described lets

Watson, Ian

377

IBM Systems Director VMControl Installation and User's Guide  

E-Print Network [OSTI]

IBM Systems Director VMControl Installation and User's Guide Version 2 Release 2 #12;#12;IBM Systems Director VMControl Installation and User's Guide Version 2 Release 2 #12;ii IBM Systems Director read this book . . . . . . . . . 1 Conventions and terminology . . . . . . . . 1 Chapter 2. IBM Systems

378

SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES Earthquake Engineering Research in  

E-Print Network [OSTI]

SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES Earthquake Engineering Research Infrastructures (RI) in regions of high seismicity. · Limited access of the Scientific and Technical (S resources at some RIs. #12;SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES KEY POINTS

379

Charging and Storage Infrastructure Design for Electric Vehicles MARJAN MOMTAZPOUR and PATRICK BUTLER, Virginia Tech  

E-Print Network [OSTI]

A Charging and Storage Infrastructure Design for Electric Vehicles MARJAN MOMTAZPOUR and PATRICK charging and storage infrastructure design for electric vehicles. We develop coordinated clustering. 2012. Charging and Storage Infrastructure Design for EVs. ACM Trans. Intell. Syst. Technol. V, N

Ramakrishnan, Naren

380

Page 1 of 5 Installation Name ____________________________________________________________  

E-Print Network [OSTI]

Treatment Objectives Solids dewatering is typically used to remove excess water from sludges generated composition 2) Typical treatment objectives 3) References 4) Data collection requirements 5) Performance for the metals precipitation treatment system. · Process Engineer (site visit, treatment system evaluation

US Army Corps of Engineers

Note: This page contains sample records for the topic "infrastructure evaluation installation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

TECHNOLOGIES TO ENHANCE OPERATION OF THE EXISTING NATURAL GAS COMPRESSION INFRASTRUCTURE  

SciTech Connect (OSTI)

This quarterly report documents work performed under Tasks 10 through 14 of the project entitled: ''Technologies to Enhance Operation of the Existing Natural Gas Compression Infrastructure''. The project objective is to develop and substantiate methods for operating integral engine/compressors in gas pipeline service, which reduce fuel consumption, increase capacity, and enhance mechanical integrity. The report first documents tests performed on a KVG103 engine/compressor installed at Duke's Thomaston Compressor Station. This is the first series of tests performed on a four-stroke engine under this program. Additionally, this report presents results, which complete a comparison of performance before and after modification to install High Pressure Fuel Injection and a Turbocharger on a GMW10 at Williams Station 60. Quarterly Reports 7 and 8 already presented detailed data from tests before and after this modification, but the final quantitative comparison required some further analysis, which is presented in Section 5 of this report. The report further presents results of detailed geometrical measurements and flow bench testing performed on the cylinders and manifolds of the Laboratory Cooper GMVH6 engine being employed for two-stroke engine air balance investigations. These measurements are required to enhance the detailed accuracy in modeling the dynamic interaction of air manifold, exhaust manifold, and in-cylinder fuel-air balance.

Anthony J. Smalley; Ralph E. Harris; Gary D. Bourn; Danny M. Deffenbaugh

2005-01-01T23:59:59.000Z

382

Install, both Arduino and AmaSeis software programs: Installing Arduino and drivers: Setting up AmaSeis  

E-Print Network [OSTI]

Install, both Arduino and AmaSeis software programs: Installing Arduino and drivers: Setting up Ama the Arduino drivers. Take note of the assigned com port number, and set up AmaSeis to that number. 3. Some computers will require the following. Keep in mind, Arduino, does not need to run or be involved. You just

Barrash, Warren

383

The geography of strategy : an exploration of alternative frameworks for transportation infrastructure strategy development  

E-Print Network [OSTI]

This thesis introduces the notion of a strategy development framework for transportation infrastructure systems. A strategy development framework has several dimensions: the organizations that own.infrastructure, the ...

Dunn, Travis P

2010-01-01T23:59:59.000Z

384

Community Development Block Grant/Economic Development Infrastructure Financing (CDBG/EDIF) (Oklahoma)  

Broader source: Energy.gov [DOE]

Community Development Block Grant/Economic Development Infrastructure Financing (CDBG/EDIF) provides public infrastructure financing to help communities grow jobs, enable new business startups and...

385

E-Print Network 3.0 - area existing infrastructure Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

infrastructure Satisfying the demands of dynamic business processes 12;How service-oriented architecture (SOA... ) impacts your IT infrastructure Page No.2 Introduction More...

386

Nuclear Infrastructure Development: Strategies and Methods for Engaging Nuclear Energy Seeking States  

SciTech Connect (OSTI)

This is the final report for the three infrastructure development workshops PNNL hosted or supported: the two infrastructure development seminars and the Como conference

Frazar, Sarah L.; Kessler, Carol A.; Kreyling, Sean J.; Morris, Frederic A.; Mathews, Caroline E.; Bissani, Mo; Vergino, Eileen; Essner, Jonathan; Babcock, Rose A.; Eipeldauer, Dawn; Shipwash, Jacqueline; Apt, Kenneth E.

2009-01-31T23:59:59.000Z

387

University Scholarship Listing Energy Production and Infrastructure Center (EPIC) Engineering Scholarship  

E-Print Network [OSTI]

A1 University Scholarship Listing Energy Production and Infrastructure Center (EPIC) Engineering within the energy production and infrastructure curriculum and/or affiliated with the Energy Production

Xie,Jiang (Linda)

388

E-Print Network 3.0 - active directory infrastructure Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Powered by Explorit Topic List Advanced Search Sample search results for: active directory infrastructure Page: << < 1 2 3 4 5 > >> 1 Infrastructures PKI Challenges Summary: :...

389

Effect of Sea Level Rise on Energy Infrastructure in Four Major...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Effect of Sea Level Rise on Energy Infrastructure in Four Major Metropolitan Areas (September 2014) Effect of Sea Level Rise on Energy Infrastructure in Four Major Metropolitan...

390

Design and Operation of an Open, Interoperable Automated Demand Response Infrastructure for Commercial Buildings  

E-Print Network [OSTI]

and Demand Response in Commercial Building,” Report No.Demand Response Infrastructure for Commercial Buildings MaryDemand Response Infrastructure for Commercial Buildings Mary

Piette, Mary Ann

2010-01-01T23:59:59.000Z

391

Potential for substitution of geothermal energy at domestic defense installations and White Sands Missile Range  

SciTech Connect (OSTI)

Geothermal resources that might provide substitute energy at any of 76 defense installations are identified and evaluated. The geologic characteristics and related economics of potential geothermal resources located at or near the 76 installations were estimated. The geologic assessment identified 18 installations with possible geothermal resources and 4 Atlantic Coastal Plain resource configurations that represented the alternatives available to East Coast bases. These 18 locations and 4 resource configurations, together with 2 possible resources at the White Sands Missile Range and a potential resource at Kings Bay, Georgia, were examined to determine the relative economics of substituting potential geothermal energy for part or all of the existing oil, gas, and electrical energy usage. Four of the military installations - Mountain Home, Norton, Hawthorne, and Sierra - appear to be co-located with possible geothermal resources which, if present, might provide substitute energy at or below current market prices for oil. Six additional locations - Ellsworth, Luke, Williams, Bliss, Fallon, and Twentynine Palms - could become economically attractive under certain conditions. No geothermal resource was found to be economically competitive with natural gas at current controlled prices. Generation of electric power at the locations studied is estimated to be uneconomic at present.

Bakewell, C.A.; Renner, J.L.

1982-01-01T23:59:59.000Z

392

Installation and Commissioning Automated Demand Response Systems  

SciTech Connect (OSTI)

Demand Response (DR) can be defined as actions taken to reduce electric loads when contingencies, such as emergencies and congestion, occur that threaten supply-demand balance, or market conditions raise supply costs. California utilities have offered price and reliability DR based programs to customers to help reduce electric peak demand. The lack of knowledge about the DR programs and how to develop and implement DR control strategies is a barrier to participation in DR programs, as is the lack of automation of DR systems. Most DR activities are manual and require people to first receive notifications, and then act on the information to execute DR strategies. Levels of automation in DR can be defined as follows. Manual Demand Response involves a labor-intensive approach such as manually turning off or changing comfort set points at each equipment switch or controller. Semi-Automated Demand Response involves a pre-programmed demand response strategy initiated by a person via centralized control system. Fully-Automated Demand Response does not involve human intervention, but is initiated at a home, building, or facility through receipt of an external communications signal. The receipt of the external signal initiates pre-programmed demand response strategies. We refer to this as Auto-DR (Piette et. al. 2005). Auto-DR for commercial and industrial facilities can be defined as fully automated DR initiated by a signal from a utility or other appropriate entity and that provides fully-automated connectivity to customer end-use control strategies. One important concept in Auto-DR is that a homeowner or facility manager should be able to 'opt out' or 'override' a DR event if the event comes at time when the reduction in end-use services is not desirable. Therefore, Auto-DR is not handing over total control of the equipment or the facility to the utility but simply allowing the utility to pass on grid related information which then triggers facility defined and programmed strategies if convenient to the facility. From 2003 through 2006 Lawrence Berkeley National Laboratory (LBNL) and the Demand Response Research Center (DRRC) developed and tested a series of demand response automation communications technologies known as Automated Demand Response (Auto-DR). In 2007, LBNL worked with three investor-owned utilities to commercialize and implement Auto-DR programs in their territories. This paper summarizes the history of technology development for Auto-DR, and describes the DR technologies and control strategies utilized at many of the facilities. It outlines early experience in commercializing Auto-DR systems within PG&E DR programs, including the steps to configure the automation technology. The paper also describes the DR sheds derived using three different baseline methodologies. Emphasis is given to the lessons learned from installation and commissioning of Auto-DR systems, with a detailed description of the technical coordination roles and responsibilities, and costs.

Global Energy Partners; Pacific Gas and Electric Company; Kiliccote, Sila; Kiliccote, Sila; Piette, Mary Ann; Wikler, Greg; Prijyanonda, Joe; Chiu, Albert

2008-04-21T23:59:59.000Z

393

Risk Assessment Methodology for Protecting Our Critical Physical Infrastructures  

SciTech Connect (OSTI)

Critical infrastructures are central to our national defense and our economic well-being, but many are taken for granted. Presidential Decision Directive (PDD) 63 highlights the importance of eight of our critical infrastructures and outlines a plan for action. Greatly enhanced physical security systems will be required to protect these national assets from new and emerging threats. Sandia National Laboratories has been the lead laboratory for the Department of Energy (DOE) in developing and deploying physical security systems for the past twenty-five years. Many of the tools, processes, and systems employed in the protection of high consequence facilities can be adapted to the civilian infrastructure.

BIRINGER,BETTY E.; DANNEELS,JEFFREY J.

2000-12-13T23:59:59.000Z

394

U.S. Department of Energy Vehicle Technologies Program -- Advanced Vehicle Testing Activity -- Plug-in Hybrid Electric Vehicle Charging Infrastructure Review  

SciTech Connect (OSTI)

Plug-in hybrid electric vehicles (PHEVs) are under evaluation by various stake holders to better understand their capability and potential benefits. PHEVs could allow users to significantly improve fuel economy over a standard HEV and in some cases, depending on daily driving requirements and vehicle design, have the ability to eliminate fuel consumption entirely for daily vehicle trips. The cost associated with providing charge infrastructure for PHEVs, along with the additional costs for the on-board power electronics and added battery requirements associated with PHEV technology will be a key factor in the success of PHEVs. This report analyzes the infrastructure requirements for PHEVs in single family residential, multi-family residential and commercial situations. Costs associated with this infrastructure are tabulated, providing an estimate of the infrastructure costs associated with PHEV deployment.

Kevin Morrow; Donald Darner; James Francfort

2008-11-01T23:59:59.000Z

395

Electric Drive Vehicle Demonstration and Vehicle Infrastructure...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

2 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting arravt066vsskarner2012...

396

Electric Drive Vehicle Demonstration and Vehicle Infrastructure...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

1 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer Evaluation arravt066vsskarner2011...

397

Building a Community Infrastructure for Scalable On-Line Performance Analysis Tools around Open|Speedshop  

SciTech Connect (OSTI)

Peta-scale computing environments pose significant challenges for both system and application developers and addressing them required more than simply scaling up existing tera-scale solutions. Performance analysis tools play an important role in gaining this understanding, but previous monolithic tools with fixed feature sets have not sufficed. Instead, this project worked on the design, implementation, and evaluation of a general, flexible tool infrastructure supporting the construction of performance tools as “pipelines” of high-quality tool building blocks. These tool building blocks provide common performance tool functionality, and are designed for scalability, lightweight data acquisition and analysis, and interoperability. For this project, we built on Open|SpeedShop, a modular and extensible open source performance analysis tool set. The design and implementation of such a general and reusable infrastructure targeted for petascale systems required us to address several challenging research issues. All components needed to be designed for scale, a task made more difficult by the need to provide general modules. The infrastructure needed to support online data aggregation to cope with the large amounts of performance and debugging data. We needed to be able to map any combination of tool components to each target architecture. And we needed to design interoperable tool APIs and workflows that were concrete enough to support the required functionality, yet provide the necessary flexibility to address a wide range of tools. A major result of this project is the ability to use this scalable infrastructure to quickly create tools that match with a machine architecture and a performance problem that needs to be understood. Another benefit is the ability for application engineers to use the highly scalable, interoperable version of Open|SpeedShop, which are reassembled from the tool building blocks into a flexible, multi-user interface set of tools. This set of tools targeted at Office of Science Leadership Class computer systems and selected Office of Science application codes. We describe the contributions made by the team at the University of Wisconsin. The project built on the efforts in Open|SpeedShop funded by DOE/NNSA and the DOE/NNSA Tri-Lab community, extended Open|Speedshop to the Office of Science Leadership Class Computing Facilities, and addressed new challenges found on these cutting edge systems. Work done under this project at Wisconsin can be divided into two categories, new algorithms and techniques for debugging, and foundation infrastructure work on our Dyninst binary analysis and instrumentation toolkits and MRNet scalability infrastructure.

Miller, Barton

2014-06-30T23:59:59.000Z

398

Preliminary assessment report for Camp Swift Military Reservation, Installation 48070, Bastrop County, Texas. Installation Restoration Program  

SciTech Connect (OSTI)

This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard property in Bastrop County, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Camp Swift property, the requirement of the Department of Defense Installation Restoration Program (IRP). The review of both historical and current practices at the property indicated that the activities at Camp Swift include no operations considered to have an adverse impact to the environment. The recommendation, therefore, is that no further IRP action is necessary at this property.

Dennis, C.B.

1993-08-01T23:59:59.000Z

399

Preliminary assessment report for National Guard Facility, Installation 25255, Rehoboth, Massachusetts. Installation Restoration Program  

SciTech Connect (OSTI)

This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Massachusetts Army National Guard (MAARNG) property known as the Rehoboth National Guard Facility (RNGF) in Rehoboth, Massachusetts. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for ftirther action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the RNGF property, phase I of the Department of Defense Installation Restoration Program (IRP). The scope of this assessment is limited to the facilities under the control of the MAARNG and the past activities contained within that area.

Haffenden, R.; Flaim, S.; Krokosz, M.

1993-08-01T23:59:59.000Z

400

Solar hot water system installed at Mobile, Alabama. Final report  

SciTech Connect (OSTI)

This final report describes the solar energy hot water system installed at LaQuinta Motor Inn Inc., at Mobile, Alabama. The building is a 122 unit motel. The system consists of six rows of ten collectors and three rows of eleven collectors (1990 square feet) mounted on the roof. Griswald flow control valves were installed to regulate the flow to each row. Two Heliotrope electronic thermometers with a combined capability of measuring the temperatures of 22 different locations were installed for monitoring purposes. Engineering drawings, component specifications, and operator instructions are included.

None

1980-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "infrastructure evaluation installation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Safety assessment of discharge chute isolation barrier preparation and installation activities. Revision 3  

SciTech Connect (OSTI)

This revision adds a section addressing impacts of dropping surfacing tool and rack cutter on the basin floor, and corrects typographical errors. The safety assessment is made for the activities for the preparation and installation of the discharge chute isolation barriers. The safety assessment includes a hazard assessment and comparisons of potential accidents/events to those addressed by the current safety basis documentation. No significant hazards were identified. An evaluation against the USQ evaluation questions was made and the determination made that the activities do not represent a USQ. Hazard categorization techniques were used to provide a basis for readiness review classifications.

Meichle, R.H.

1994-11-08T23:59:59.000Z

402

Webinar March 10: 2nd International Hydrogen Infrastructure Challenges...  

Broader source: Energy.gov (indexed) [DOE]

entitled "2nd International Hydrogen Infrastructure Challenges Webinar" on Tuesday, March 10, from 8 to 9 a.m. Eastern Daylight Time. This webinar will summarize the 2nd...

403

A Privacy Conscious Bluetooth Infrastructure for Location Aware Computing  

E-Print Network [OSTI]

We present a low cost and easily deployed infrastructure for location aware computing that is built using standard Bluetooth® technologies and personal computers. Mobile devices are able to determine their location to ...

Huang, Albert

404

The Bucharest Tandem Accelerator - part of the European Infrastructure  

SciTech Connect (OSTI)

The Bucharest Tandem van de Graaff accelerator in Bucharest is described. The scientific program in both applied and basic research is outlined. Through many international collaborations, the accelerator is, indeed, part of the European Nuclear Physics Research infrastructure.

Zamfir, Nicolae Victor [Horia Hulubei National Institute of Physics and Nuclear Engineering, P.O. Box Mg-6, Bucharest-Magurele (Romania)

2007-04-23T23:59:59.000Z

405

Dynamic Infrastructure Smarter Services for a Smarter Planet  

E-Print Network [OSTI]

Dynamic Infrastructure Smarter Services for a Smarter Planet IBM Software Services for Tivoli lab prototype using up to 6 standard resource models. Duration 5 days. IBM Quickstart Services for Tivoli Monitoring for Energy Management This service offering helps you t

406

Architecture of the rail : exploring the potential of urban infrastructure  

E-Print Network [OSTI]

This thesis is the pursuit of a sensitivity for the relationship between urban infrastructure and architectural form, an attempt to restore a quality of "publicness" in the urban landscape through the implementation of a ...

Iboshi, Gregory Kenji

1994-01-01T23:59:59.000Z

407

Embracing the shadows : inhabitation of an infrastructural landscape  

E-Print Network [OSTI]

This thesis embraces the slots of space left behind by regional transportation infrastructure: It proposes an inhabitation of the places over, under and within existing enclaves and impasses, through an engagement of the ...

Luther, Rebecca M. (Rebecca Marie), 1976-

2004-01-01T23:59:59.000Z

408

Etherthreads : an infrastructure for location-based messages  

E-Print Network [OSTI]

This thesis proposes an infrastructure for location-based services for Bluetooth enabled cellular phones. Specifically, it explores the use of this architecture in a location-based messaging application. A user can send ...

Lassey, Bradford, 1980-

2004-01-01T23:59:59.000Z

409

Street Trees, Overhead Utlitly Distribution, and Physical Infrastructure  

E-Print Network [OSTI]

Street Trees, Overhead Utlitly Distribution, and Physical Infrastructure: Design Implictions of overhead lines for electric transmission to the customer is common in most communities, and is most likely and mission Research and Responsibilities Design considerations Ecological Considerations Budgeting

Schweik, Charles M.

410

Optimization Online - Object-Parallel Infrastructure for Implementing ...  

E-Print Network [OSTI]

4 days ago ... Abstract: We describe the design of a C++ vector-manipulation substrate ... system that greatly reduces the overhead induced by compiler temporaries and ... We also provide infrastructure to support line-search methods by ...

Jonathan Eckstein

411

Earth pressures and deformations in civil infrastructure in expansive soils  

E-Print Network [OSTI]

This dissertation includes the three major parts of the study: volume change, and lateral earth pressure due to suction change in expansive clay soils, and design of civil infrastructure drilled pier, retaining wall and pavement in expansive soils...

Hong, Gyeong Taek

2008-10-10T23:59:59.000Z

412

Large-scale simulator for global data infrastructure optimization  

E-Print Network [OSTI]

Companies depend on information systems to control their operations. During the last decade, Information Technology (IT) infrastructures have grown in scale and complexity. Any large company runs many enterprise applications ...

Herrero-López, Sergio

2012-01-01T23:59:59.000Z

413

Indian Energy & Energy Infrastructure to be Showcased at RES...  

Energy Savers [EERE]

to discuss economic development. Indian energy and energy infrastructure are at the heart of our conversations that will be happening at RES. Tracey LeBeau, the Director of our...

414

Strategic indicators for characterization of water system infrastructure and management  

E-Print Network [OSTI]

Shifts in the US water industry are characteristic of the flux found across all infrastructure sectors. Economic, environmental, market, regulatory and systemic forces are pushing the industry toward a different future ...

Garvin, Michael J. (Michael Joseph)

2001-01-01T23:59:59.000Z

415

SECTION 340 WRDA 1992, AS AMENDED ENVIRONMENTAL INFRASTRUCTURE  

E-Print Network [OSTI]

SECTION 340 ­ WRDA 1992, AS AMENDED ENVIRONMENTAL INFRASTRUCTURE SOUTHERN WEST VIRGINIA MODEL for the provision of environmental assistance to non-Federal interests in southern West Virginia pursuant to Section

US Army Corps of Engineers

416

SECTION 340 WRDA 1992, AS AMENDED ENVIRONMENTAL INFRASTRUCTURE  

E-Print Network [OSTI]

SECTION 340 ­ WRDA 1992, AS AMENDED ENVIRONMENTAL INFRASTRUCTURE SOUTHERN WEST VIRGINIA MODEL of environmental assistance to non-Federal interests in southern West Virginia pursuant to Section 340 of the Water

US Army Corps of Engineers

417

Efficient Algorithms for Infrastructure Networks: Planning Issues and Economic Impact  

E-Print Network [OSTI]

down description of the techno-economic model Efficient Algorithms for Infrastructure Networks: Planning Issues and Economic Impact Frank and Economic Impact Academisch Proefschrift ter verkrijging van de graad van Doctor aan de Vrije Universiteit

van der Mei, Rob

418

Protection of Coastal Infrastructure under Rising Flood Risk  

E-Print Network [OSTI]

The 2005 hurricane season was particularly damaging to the United States, contributing to significant losses to energy infrastructure—much of it the result of flooding from storm surge during hurricanes Katrina and Rita. ...

Lickley, M.J.

419

Risk Management Analysis of Our Water Infrastructure's Soft, Chewy Center  

E-Print Network [OSTI]

's water infrastructure is designed, constructed and managed is changing. More fencing, better alarm systems and high-tech cameras will be a part of this change in thinking. These physical security features may be considered the "hard outer shell...

Wolff, Mark

2005-05-20T23:59:59.000Z

420

Artificial nature : water infrastructure and its experience as natural space  

E-Print Network [OSTI]

This work is about water infrastructure and its experience as urban and natural space. It deals with the concepts of nature/geography, technology, and the integral experiential space by analyzing water dams and reservoirs ...

Demirta?, Fatma Asl?han, 1970-

2000-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "infrastructure evaluation installation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Integration of wireless sensor networks in environmental monitoring cyber infrastructure  

E-Print Network [OSTI]

Integration of wireless sensor networks in environmental monitoring cyber infrastructure Jue Yang Ă? to revolutionize many science and engineering domains. We present a novel environmental monitoring system collection, management, visualization, dissemination, and exchange, conforming to the new Sensor Web

Huang, Yan

422

VICE 2.0 Helps Fleets Evaluate CNG Investments (Fact Sheet)  

SciTech Connect (OSTI)

Vehicle and Infrastructure Cash-Flow Evaluation (VICE) 2.0 online tool estimates financial and emissions benefits of compressed natural gas (CNG) in vehicles.

Not Available

2014-03-01T23:59:59.000Z

423

Fuel Cell Transit Buses: ThunderPower Bus Evaluation at SunLine...  

Broader source: Energy.gov (indexed) [DOE]

ThunderPower Bus Evaluation at SunLine Transit Agency Transit Buses Hydrogen, Fuel Cells & Infrastructure Technologies Program Fuel Cell A Strong Energy Portfolio for a Strong...

424

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project  

SciTech Connect (OSTI)

General Motors, LLC and energy partner Shell Hydrogen, LLC, deployed a system of hydrogen fuel cell electric vehicles integrated with a hydrogen fueling station infrastructure to operate under real world conditions as part of the U.S. Department of Energy's Controlled Hydrogen Fleet and Infrastructure Validation and Demonstration Project. This technical report documents the performance and describes the learnings from progressive generations of vehicle fuel cell system technology and multiple approaches to hydrogen generation and delivery for vehicle fueling.

Stottler, Gary

2012-02-08T23:59:59.000Z

425

ChargePoint America Vehicle Charging Infrastructure Summary Report  

Broader source: Energy.gov (indexed) [DOE]

March 2013 Number of Charging Units Charging Electricity Charging Unit - Private Not Installed to Events Consumed By Region Residential Commercia Public Specified Date...

426

ChargePoint America Vehicle Charging Infrastructure Summary Report  

Broader source: Energy.gov (indexed) [DOE]

June 2013 Number of Charging Units Charging Electricity Charging Unit - Private Not Installed to Events Consumed By Region Residential Commercia Public Specified Date Performed...

427

ChargePoint America Vehicle Charging Infrastructure Summary Report  

Broader source: Energy.gov (indexed) [DOE]

December 2012 Number of Charging Units Charging Electricity Charging Unit - Private Not Installed to Events Consumed By Region Residential Commercia Public Specified Date...

428

ChargePoint America Vehicle Charging Infrastructure Summary Report  

Broader source: Energy.gov (indexed) [DOE]

Report Project Status to Date through: March 2012 Number of Charging Units Charging Electricity Charging Unit - Private Installed to Events Consumed By State Residential...

429

ChargePoint America Vehicle Charging Infrastructure Summary Report  

Broader source: Energy.gov (indexed) [DOE]

September 2012 Number of Charging Units Charging Electricity Charging Unit - Private Installed to Events Consumed By State Residential Commercial Public Not Specified Date...

430

ChargePoint America Vehicle Charging Infrastructure Summary Report  

Broader source: Energy.gov (indexed) [DOE]

June 2012 Number of Charging Units Charging Electricity Charging Unit - Private Installed to Events Consumed By State Residential Commercial Public Not Specified Date Performed...

431

Video Installation Design: Appropriation and Assemblage As Projection Surface Geometry  

E-Print Network [OSTI]

This area of research focuses on the use of video projections in the context of fine art. Emphasis is placed on creating a unique video installation work that incorporates assemblage and appropriation as a means to develop multiple complex...

Weaver, Timothy A.

2010-07-14T23:59:59.000Z

432

Defense Energy Support Center: Installation Energy Commodity Business Unit  

Broader source: Energy.gov [DOE]

Presentation—given at the Spring 2009 Federal Utility Partnership Working Group (FUPWG) meeting—discusses the Defense Energy Support Center's (DESC's) Installation Energy Commodity Business Unit (CBU) including its intent, commitment, pilot project, lessons learned, and impending barriers.

433

New Jersey SmartStart Buildings- Direct Install Program  

Broader source: Energy.gov [DOE]

The Direct Install program offers turn-key energy efficiency solutions to qualified industrial and commercial customers that, with some exceptions, have a peak electricity demand of 150 kilowatts ...

434

Seeing solar on campus : a visible photovoltaic installation on campus  

E-Print Network [OSTI]

This paper presents a methodology for selecting a site on the MIT campus for a visible solar photovoltaic installation. Visibility, solar exposure, advertising potential, aesthetics, interactivity and direct or important ...

Guarda, Daniel Jair Alves

2006-01-01T23:59:59.000Z

435

North Shore Gas – Single Family Direct Install (Illinois)  

Broader source: Energy.gov [DOE]

Owners of single-family homes, condos, townhomes and two-flats may be eligible for a free installation of new programmable thermostats, pipe insulation, showerheads, and faucet aerators through...

436

Consider Installing Turbulators on Two- and Three-Pass Firetube...  

Broader source: Energy.gov (indexed) [DOE]

tip sheet outlines the benefits of turbulators on firetube boilers as part of optimized steam systems. STEAM TIP SHEET 25 Consider Installing Turbulators on Two- and Three-Pass...

437

Performance Testing of Window Installation and Flashing Details  

E-Print Network [OSTI]

and proposed installation practices incorporating new flashing materials. This paper focuses specifically on the installation practices relating to windows with mounting fins or flanges. REVIEW OF CURRENT PRACTICES AND ATTITUDES Interviews with builders... into two categories based on the how the flashing and the rough opening is treated. g167g32 2-Dimensional Methods: using flashing to extend protection around the perimeter of the window flanges on to the face of the sheathing, and g167g32 3...

Weston, T. A.; Herrin, J.

2002-01-01T23:59:59.000Z

438

Installation of a high-precision Kirsten Hacker  

E-Print Network [OSTI]

Installation of a high-precision BPM in BC3 Kirsten Hacker 20-03-07 #12;BPM installed in BC2=T3*c dE/E=D/R16 EBPM T1 T2 T3 ~300mm 3um position resolution -> 1e-5 Energy resoution!!! BPM BPM #12;BPM for the Bunch Compressors beam stripline vacuumstripline vacuumStripline Vacuum Beam beam tapering

439

Broad Overview of Energy Efficiency and Renewable Energy Opportunities for Department of Defense Installations  

SciTech Connect (OSTI)

The Strategic Environmental Research and Developmental Program (SERDP)/Environmental Security Technology Certification Program (ESTCP) is the Department of Defense?s (DOD) environmental science and technology program focusing on issues related to environment and energy for the military services. The SERDP/ESTCP Office requested that the National Renewable Energy Laboratory (NREL) provide technical assistance with strategic planning by evaluating the potential for several types of renewable energy technologies at DOD installations. NREL was tasked to provide technical expertise and strategic advice for the feasibility of geothermal resources, waste-to-energy technology, photovoltaics (PV), wind, microgrids, and building system technologies on military installations. This technical report is the deliverable for these tasks.

Anderson, E.; Antkowiak, M.; Butt, R.; Davis, J.; Dean, J.; Hillesheim, M.; Hotchkiss, E.; Hunsberger, R.; Kandt, A.; Lund, J.; Massey, K.; Robichaud, R.; Stafford, B.; Visser, C.

2011-08-01T23:59:59.000Z

440

An Integrated Framework for Optimizing Automatic Monitoring Systems in Large IT Infrastructures  

E-Print Network [OSTI]

and cost. IT Infrastructure Library (ITIL) addresses monitoring as a con- tinual cycle of monitoring

Li, Tao

Note: This page contains sample records for the topic "infrastructure evaluation installation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Validation of Hydrogen Fuel Cell Vehicle and Infrastructure Technology (Fact Sheet)  

Broader source: Energy.gov [DOE]

Fact sheet on Validation of Hydrogen Fuel Cell Vehicle and Infrastructure Technology activities at NREL.

442

S E R I E S SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES  

E-Print Network [OSTI]

S E R I E S SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES COMMISSION OF THE EUROPEAN COMMUNITIES FP7- INFRASTRUCTURES-2008-1 SP4-Capacities #12;SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES #12;SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES

443

Critical Infrastructure Modeling: An Approach to Characterizing Interdependencies of Complex Networks & Control Systems  

SciTech Connect (OSTI)

Critical infrastructure control systems face many challenges entering the 21st century, including natural disasters, cyber attacks, and terrorist attacks. Revolutionary change is required to solve many existing issues, including gaining greater situational awareness and resiliency through embedding modeling and advanced control algorithms in smart sensors and control devices instead of in a central controller. To support design, testing, and component analysis, a flexible simulation and modeling capability is needed. Researchers at Idaho National Laboratory are developing and evaluating such a capability through their CIPRsim modeling and simulation framework.

Stuart Walsh; Shane Cherry; Lyle Roybal

2009-05-01T23:59:59.000Z

444

Renewable Energy Opportunities at the Kanto Installations, Japan  

SciTech Connect (OSTI)

This document provides an overview of renewable resource development potential at the U.S. Army installations in the Kanto region in Japan, which includes Camp Zama, Yokohama North Dock, Sagamihara Family Housing Area (SFHA), Sagami General Depot, and Akasaka Press Center. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the Huntsville Army Corps of Engineers, and includes the development of a methodology for renewable resource assessment at Army installations located on foreign soil. The methodology is documented in Renewable Energy Assessment Methodology for Japanese OCONUS Army Installations. The site visit to the Kanto installations took place on April 5 and 6, 2010. At the current time, there are some renewable technologies that show economic potential. Because of siting restrictions and the small size of these installations, development of most renewable energy technologies will likely be limited to Camp Zama. Project feasibility is based on installation-specific resource availability and energy costs and projections based on accepted life-cycle cost methods. Development of any renewable energy project will be challenging, as it will require investigation into existing contractual obligations, new contracts that could be developed, the legality of certain partnerships, and available financing avenues, which involves the U.S. Forces Japan (USFJ), the Government of Japan (GOJ), and a number of other parties on both sides. The Army will not be able to implement a project without involvement and approval from the other services and multiple levels of Japanese government. However, implementation of renewable energy projects could be an attractive method for GOJ to reduce greenhouse gas emissions and lower annual utility payments to USFJ. This report recommends projects to pursue and offers approaches to use. The most promising opportunities include waste-to-energy and ground source heat pumps. Solar photovoltaics (PV) may also prove successful. Other resources were found to be insufficient on the Kanto installations.

Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.; Gorrissen, Willy J.; Kora, Angela R.; Weimar, Mark R.; Hand, James R.; Orrell, Alice C.; Williamson, Jennifer L.

2010-09-24T23:59:59.000Z

445

BIOTRON INFRASTRUCTURE RENOVATION A 6.1 million dollar infrastructure renovation will begin this fall at the Biotron with completion  

E-Print Network [OSTI]

, animal and material testing controlled environment rooms Installation of energy efficient lighting to new high efficiency chillers Replacement of cooling towers Conversion of super-cold plant, animal for in advance. Major features of the renovation include: Installation of energy efficient lighting in the plant

Wisconsin at Madison, University of

446

COT 4930/5930 Security for infrastructure systems Critical infrastructure are the systems that support our everyday life and the Dept. of  

E-Print Network [OSTI]

which our normal life is not possible. This information is embodied in a process control system (PCS Infrastructure. Features and requirements. Standards. Requirements. Process control systems, information systemsCOT 4930/5930 Security for infrastructure systems Critical infrastructure are the systems

Richman, Fred

447

Monitoring Advanced Metering Infrastructures with Amilyzer  

E-Print Network [OSTI]

-way communications between smart meters and utility control centers. They are a key component of the smart grid mechanisms are part of communication standards such as the ANSI #12;C12.22. While those protective measures detecting intrusions in IT environments have been developed and evaluated. Through the Trustworthy Cyber

Sanders, William H.

448

Facebook Applications' Installation and Removal: A Temporal Analysis  

E-Print Network [OSTI]

Facebook applications are one of the reasons for Facebook attractiveness. Unfortunately, numerous users are not aware of the fact that many malicious Facebook applications exist. To educate users, to raise users' awareness and to improve Facebook users' security and privacy, we developed a Firefox add-on that alerts users to the number of installed applications on their Facebook profiles. In this study, we present the temporal analysis of the Facebook applications' installation and removal dataset collected by our add-on. This dataset consists of information from 2,945 users, collected during a period of over a year. We used linear regression to analyze our dataset and discovered the linear connection between the average percentage change of newly installed Facebook applications and the number of days passed since the user initially installed our add-on. Additionally, we found out that users who used our Firefox add-on become more aware of their security and privacy installing on average fewer new application...

Kagan, Dima; Elyashar, Aviad; Elovici, Yuval

2013-01-01T23:59:59.000Z

449

Renewable Energy Assessment Methodology for Japanese OCONUS Army Installations  

SciTech Connect (OSTI)

Since 2005, Pacific Northwest National Laboratory (PNNL) has been asked by Installation Management Command (IMCOM) to conduct strategic assessments at selected US Army installations of the potential use of renewable energy resources, including solar, wind, geothermal, biomass, waste, and ground source heat pumps (GSHPs). IMCOM has the same economic, security, and legal drivers to develop alternative, renewable energy resources overseas as it has for installations located in the US. The approach for continental US (CONUS) studies has been to use known, US-based renewable resource characterizations and information sources coupled with local, site-specific sources and interviews. However, the extent to which this sort of data might be available for outside the continental US (OCONUS) sites was unknown. An assessment at Camp Zama, Japan was completed as a trial to test the applicability of the CONUS methodology at OCONUS installations. It was found that, with some help from Camp Zama personnel in translating and locating a few Japanese sources, there was relatively little difficulty in finding sources that should provide a solid basis for conducting an assessment of comparable depth to those conducted for US installations. Project implementation will likely be more of a challenge, but the feasibility analysis will be able to use the same basic steps, with some adjusted inputs, as PNNL’s established renewable resource assessment methodology.

Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.; Gorrissen, Willy J.; Kora, Angela R.; Weimar, Mark R.; Hand, James R.; Orrell, Alice C.; Williamson, Jennifer L.

2010-08-30T23:59:59.000Z

450

Transportation Energy Futures Series: Alternative Fuel Infrastructure Expansion: Costs, Resources, Production Capacity, and Retail Availability for Low-Carbon Scenarios  

SciTech Connect (OSTI)

Achieving the Department of Energy target of an 80% reduction in greenhouse gas emissions by 2050 depends on transportation-related strategies combining technology innovation, market adoption, and changes in consumer behavior. This study examines expanding low-carbon transportation fuel infrastructure to achieve deep GHG emissions reductions, with an emphasis on fuel production facilities and retail components serving light-duty vehicles. Three distinct low-carbon fuel supply scenarios are examined: Portfolio: Successful deployment of a range of advanced vehicle and fuel technologies; Combustion: Market dominance by hybridized internal combustion engine vehicles fueled by advanced biofuels and natural gas; Electrification: Market dominance by electric drive vehicles in the LDV sector, including battery electric, plug-in hybrid, and fuel cell vehicles, that are fueled by low-carbon electricity and hydrogen. A range of possible low-carbon fuel demand outcomes are explored in terms of the scale and scope of infrastructure expansion requirements and evaluated based on fuel costs, energy resource utilization, fuel production infrastructure expansion, and retail infrastructure expansion for LDVs. This is one of a series of reports produced as a result of the Transportation Energy Futures (TEF) project, a Department of Energy-sponsored multi-agency project initiated to pinpoint underexplored transportation-related strategies for abating GHGs and reducing petroleum dependence.

Melaina, M. W.; Heath, G.; Sandor, D.; Steward, D.; Vimmerstedt, L.; Warner, E.; Webster, K. W.

2013-04-01T23:59:59.000Z

451

Development of a structural health monitoring system for the life assessment of critical transportation infrastructure.  

SciTech Connect (OSTI)

Recent structural failures such as the I-35W Mississippi River Bridge in Minnesota have underscored the urgent need for improved methods and procedures for evaluating our aging transportation infrastructure. This research seeks to develop a basis for a Structural Health Monitoring (SHM) system to provide quantitative information related to the structural integrity of metallic structures to make appropriate management decisions and ensuring public safety. This research employs advanced structural analysis and nondestructive testing (NDT) methods for an accurate fatigue analysis. Metal railroad bridges in New Mexico will be the focus since many of these structures are over 100 years old and classified as fracture-critical. The term fracture-critical indicates that failure of a single component may result in complete collapse of the structure such as the one experienced by the I-35W Bridge. Failure may originate from sources such as loss of section due to corrosion or cracking caused by fatigue loading. Because standard inspection practice is primarily visual, these types of defects can go undetected due to oversight, lack of access to critical areas, or, in riveted members, hidden defects that are beneath fasteners or connection angles. Another issue is that it is difficult to determine the fatigue damage that a structure has experienced and the rate at which damage is accumulating due to uncertain history and load distribution in supporting members. A SHM system has several advantages that can overcome these limitations. SHM allows critical areas of the structure to be monitored more quantitatively under actual loading. The research needed to apply SHM to metallic structures was performed and a case study was carried out to show the potential of SHM-driven fatigue evaluation to assess the condition of critical transportation infrastructure and to guide inspectors to potential problem areas. This project combines the expertise in transportation infrastructure at New Mexico State University with the expertise at Sandia National Laboratories in the emerging field of SHM.

Roach, Dennis Patrick; Jauregui, David Villegas (New Mexico State University, Las Cruces, NM); Daumueller, Andrew Nicholas (New Mexico State University, Las Cruces, NM)

2012-02-01T23:59:59.000Z

452

E-Print Network 3.0 - applicable aux installations Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Thermal Simulation (Windows Only) 6-10 Chapter 7 Installing PTC Application Manager (UNIX Only... ) Installing PTC Application Manager 7-2 Configuring PTC Application...

453

Supersonic Air Jets Preserve Tree Roots in Underground Pipeline Installation1  

E-Print Network [OSTI]

Supersonic Air Jets Preserve Tree Roots in Underground Pipeline Installation1 Rob Gross 2 trenching operations for pipeline installation. Although mechanical soil excavation using heavy equipment

Standiford, Richard B.

454

Safety basis for the 241-AN-107 mixer pump installation and caustic addition  

SciTech Connect (OSTI)

This safety Basis was prepared to determine whether or not the proposed activities of installing a 76 HP jet mixer pump and the addition of approximately 50,000 gallons of 19 M (50:50 wt %) aqueous caustic are within the safety envelope as described by Tank Farms (chapter six of WHC-SD-WM-ISB-001, Rev. 0). The safety basis covers the components, structures and systems for the caustic addition and mixer pump installation. These include: installation of the mixer pump and monitoring equipment; operation of the mixer pump, process monitoring equipment and caustic addition; the pump stand, caustic addition skid, the electrical skid, the video camera system and the two densitometers. Also covered is the removal and decontamination of the mixer pump and process monitoring system. Authority for this safety basis is WHC-IP-0842 (Waste Tank Administration). Section 15.9, Rev. 2 (Unreviewed Safety Questions) of WHC-IP-0842 requires that an evaluation be performed for all physical modifications.

Van Vleet, R.J. [Westinghouse Hanford Co., Richland, WA (United States)

1994-10-05T23:59:59.000Z

455

Light weight underground pipe or cable installing device  

SciTech Connect (OSTI)

This invention pertains to a light weight underground pipe or cable installing device adapted for use in a narrow and deep operating trench. More particularly this underground pipe installing device employs a pair of laterally movable gates positioned adjacent the bottom of the operating trench where the earth is more solid to securely clamp the device in the operating trench to enable it to withstand the forces exerted as the actuating rod is forced through the earth from the so-called operating trench to the target trench. To accommodate the laterally movable gates positioned adjacent the bottom of the narrow pipe installing device, a pair of top operated double-acting rod clamping jaws, operated by a hydraulic cylinder positioned above the actuating rod are employed.

Schosek, W. O.

1985-01-08T23:59:59.000Z

456

ATLAS Metadata Infrastructure Evolution for Run 2 and Beyond  

E-Print Network [OSTI]

ATLAS developed and employed for Run 1 of the Large Hadron Collider a sophisticated infrastructure for metadata handling in event processing jobs. This infrastructure profits from a rich feature set provided by the ATLAS execution control framework, including standardized interfaces and invocation mechanisms for tools and services, segregation of transient data stores with concomitant object lifetime management, and mechanisms for handling occurrences asynchronous to the control framework’s state machine transitions. This metadata infrastructure is evolving and being extended for Run 2 to allow its use and reuse in downstream physics analyses, analyses that may or may not utilize the ATLAS control framework. At the same time, multiprocessing versions of the control framework and the requirements of future multithreaded frameworks are leading to redesign of components that use an incident-handling approach to asynchrony. The increased use of scatter-gather architectures, both local and distributed, requires ...

van Gemmeren, Peter; The ATLAS collaboration; Cranshaw, Jack; Vaniachine, Alexandre

2015-01-01T23:59:59.000Z

457

Design andDesign and Installation of aInstallation of a  

E-Print Network [OSTI]

Southwest Research Institute DOE Hydrogen and Fuel Cells Merit Review Meeting May 19, 2003 #12;Key Future plans #12;MEAs-The Heart of the Fuel Cell #12;Fuel Cell Catalyst Issues Deposition Approaches-throughput manufacturing technology. Evaluate performance of materials under relevant fuel cell operating conditions

458

Advanced Wireless Power Transfer Vehicle and Infrastructure Analysis (Presentation)  

SciTech Connect (OSTI)

This presentation discusses current research at NREL on advanced wireless power transfer vehicle and infrastructure analysis. The potential benefits of E-roadway include more electrified driving miles from battery electric vehicles, plug-in hybrid electric vehicles, or even properly equipped hybrid electric vehicles (i.e., more electrified miles could be obtained from a given battery size, or electrified driving miles could be maintained while using smaller and less expensive batteries, thereby increasing cost competitiveness and potential market penetration). The system optimization aspect is key given the potential impact of this technology on the vehicles, the power grid and the road infrastructure.

Gonder, J.; Brooker, A.; Burton, E.; Wang, J.; Konan, A.

2014-06-01T23:59:59.000Z

459

An infrastructure for passive network monitoring of application data streams  

SciTech Connect (OSTI)

When diagnosing network problems, it is often desirable to have a view of traffic inside the network. In this paper we describe an infrastructure for passive monitoring that can be used to determine which segments of the network are the source of problems for an application data stream. The monitoring hosts are relatively low-cost, off-the-shelf PCs. A unique feature of the infrastructure is secure activation of monitoring hosts in the core of the network without direct network administrator intervention.

Agarwal, Deb; Gonzalez, Jose Maria; Jin, Guojun; Tierney, Brian

2003-03-01T23:59:59.000Z

460

Installation, Operation, and Maintenance Strategies to Reduce the Cost of Offshore Wind Energy  

SciTech Connect (OSTI)

Currently, installation, operation, and maintenance (IO&M) costs contribute approximately 30% to the LCOE of offshore wind plants. To reduce LCOE while ensuring safety, this paper identifies principal cost drivers associated with IO&M and quantifies their impacts on LCOE. The paper identifies technology improvement opportunities and provides a basis for evaluating innovative engineering and scientific concepts developed subsequently to the study. Through the completion of a case study, an optimum IO&M strategy for a hypothetical offshore wind project is identified.

Maples, B.; Saur, G.; Hand, M.; van de Pieterman, R.; Obdam, T.

2013-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "infrastructure evaluation installation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Handbook of experiences in the design and installation of solar heating and cooling systems  

SciTech Connect (OSTI)

A large array of problems encountered are detailed, including design errors, installation mistakes, cases of inadequate durability of materials and unacceptable reliability of components, and wide variations in the performance and operation of different solar systems. Durability, reliability, and design problems are reviewed for solar collector subsystems, heat transfer fluids, thermal storage, passive solar components, piping/ducting, and reliability/operational problems. The following performance topics are covered: criteria for design and performance analysis, domestic hot water systems, passive space heating systems, active space heating systems, space cooling systems, analysis of systems performance, and performance evaluations. (MHR)

Ward, D.S.; Oberoi, H.S.

1980-07-01T23:59:59.000Z

462

2 Science and Technology of Nuclear Installations the nuclear data are added in a speci c format to so-called  

E-Print Network [OSTI]

information from experi- mental cross-section data, integral data (critical assemblies), and nuclear models#12;2 Science and Technology of Nuclear Installations the nuclear data are added in a speci c format to so-called evaluated nuclear data les, such as ENDF-6 (Evaluated Nuclear Data File-6). e

Demazière, Christophe

463

Hydrogen and Infrastructure Costs | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietip sheetK-4In 2013DepartmentAgenda for theTrucksEvaluation71Fred

464

TVA Partner Utilities- In-Home Energy Evaluation Program  

Broader source: Energy.gov [DOE]

The Tennessee Valley Authority (TVA) ''energy right'' In-Home Energy Evaluation Pilot Program encourages the installation of energy-efficiency improvements in existing single family dwellings. The...

465

Critical Infrastructure for Ocean Research and Societal Needs in 2030  

SciTech Connect (OSTI)

The United States has jurisdiction over 3.4 million square miles of ocean�an expanse greater than the land area of all fifty states combined. This vast marine area offers researchers opportunities to investigate the ocean�s role in an integrated Earth system, but also presents challenges to society, including damaging tsunamis and hurricanes, industrial accidents, and outbreaks of waterborne diseases. The 2010 Gulf of Mexico Deepwater Horizon oil spill and 2011 Japanese earthquake and tsunami are vivid reminders that a broad range of infrastructure is needed to advance our still-incomplete understanding of the ocean. The National Research Council (NRC)�s Ocean Studies Board was asked by the National Science and Technology Council�s Subcommittee on Ocean Science and Technology, comprised of 25 U.S. government agencies, to examine infrastructure needs for ocean research in the year 2030. This request reflects concern, among a myriad of marine issues, over the present state of aging and obsolete infrastructure, insufficient capacity, growing technological gaps, and declining national leadership in marine technological development; issues brought to the nation�s attention in 2004 by the U.S. Commission on Ocean Policy. A 15-member committee of experts identified four themes that encompass 32 future ocean research questions�enabling stewardship of the environment, protecting life and property, promoting economic vitality, and increasing fundamental scientific understanding. Many of the questions in the report (e.g., sea level rise, sustainable fisheries, the global water cycle) reflect challenging, multidisciplinary science questions that are clearly relevant today, and are likely to take decades of effort to solve. As such, U.S. ocean research will require a growing suite of ocean infrastructure for a range of activities, such as high quality, sustained time series observations or autonomous monitoring at a broad range of spatial and temporal scales. Consequently, a coordinated national plan for making future strategic investments becomes an imperative to address societal needs. Such a plan should be based upon known priorities and should be reviewed every 5-10 years to optimize the federal investment. The committee examined the past 20 years of technological advances and ocean infrastructure investments (such as the rise in use of self-propelled, uncrewed, underwater autonomous vehicles), assessed infrastructure that would be required to address future ocean research questions, and characterized ocean infrastructure trends for 2030. One conclusion was that ships will continue to be essential, especially because they provide a platform for enabling other infrastructure � autonomous and remotely operated vehicles; samplers and sensors; moorings and cabled systems; and perhaps most importantly, the human assets of scientists, technical staff, and students. A comprehensive, long-term research fleet plan should be implemented in order to retain access to the sea. The current report also calls for continuing U.S. capability to access fully and partially ice-covered seas; supporting innovation, particularly the development of biogeochemical sensors; enhancing computing and modeling capacity and capability; establishing broadly accessible data management facilities; and increasing interdisciplinary education and promoting a technically-skilled workforce. The committee also provided a framework for prioritizing future investment in ocean infrastructure. They recommend that development, maintenance, or replacement of ocean research infrastructure assets should be prioritized in terms of societal benefit, with particular consideration given to usefulness for addressing important science questions; affordability, efficiency, and longevity; and ability to contribute to other missions or applications. These criteria are the foundation for prioritizing ocean research infrastructure investments by estimating

National Research Council

2011-04-22T23:59:59.000Z

466

Infrastructure Security EXCEPTIONAL SERVICE IN THE NATIONAL INTEREST  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DOE SunShot Initiative. SunShot is a collaborative national initiative to make solar energy cost competitive with other energy generation by 2020. Reducing the installed cost of...

467

Sustainability Research & Development Consortium for DoD Installations  

E-Print Network [OSTI]

Sustainability Research & Development Consortium for DoD Installations Warner College of Natural the growing need for sustainability planning, imple- mentation, and facilitation on United States military bases. CEMML is already a proven global provider of re- search and sustainable management of natural

468

RFAR installation for Buildings 703, 712, 747, 748 and 1163  

SciTech Connect (OSTI)

This document is to certify the installation and testing of the Radio Fire Alarm Reporting box (RFAR). The Hanford Fire Dept. will be notified of troubles via RFAR. The document outlines prerequisites, necessary equipment, and the fire alarm system test to insure the system is operating correctly.

Ferry, M.

1995-12-31T23:59:59.000Z

469

T-729: Mozilla Code Installation Through Holding Down Enter  

Broader source: Energy.gov [DOE]

Attackers can exploit this issue by enticing an unsuspecting victim into viewing and interacting with a malicious Web page. An attacker may be able to exploit this issue to bypass a confirmation dialog and install an arbitrary add-on. This may aid in further attacks.

470

Sun N1 Grid Engine 6.1 Installation Guide  

E-Print Network [OSTI]

Sun N1 Grid Engine 6.1 Installation Guide Sun Microsystems, Inc. 4150 Network Circle Santa Clara, CA 95054 U.S.A. Part No: 820­0697 May 2007 #12;Copyright 2007 Sun Microsystems, Inc. 4150 Network Circle, Santa Clara, CA 95054 U.S.A. All rights reserved. Sun Microsystems, Inc. has intellectual

471

Decidability Results for Dynamic Installation of Compensation Handlers  

E-Print Network [OSTI]

that in a simple -like calculus with static compen- sations the termination of a process is decidable Zavattaro Focus Team, University of Bologna & INRIA, Italy Abstract. Dynamic compensation installation compensations, showing that process termination is decidable for parallel and replacing compensations while

Paris-Sud XI, Université de

472

WARNING: Improper installation, adjustment, alteration, service or maintenance can  

E-Print Network [OSTI]

INSTALLATION AND OPERATING INSTRUCTIONS FOR AUTOMATIC INSTANTANEOUS TYPE WATER HEATERS FOR USE WITH NATURAL(02.01)AL #12;2 This well engineered, gas water heater has all the fea- tures a water heater should have on the water heater, giving you control over your hot water energy use. Each time you turn off your hot water

Kostic, Milivoje M.

473

Systems study of drilling for installation of geothermal heat pumps  

SciTech Connect (OSTI)

Geothermal, or ground-source, heat pumps (GHP) are much more efficient than air-source units such as conventional air conditioners. A major obstacle to their use is the relatively high initial cost of installing the heat-exchange loops into the ground. In an effort to identify drivers which influence installation cost, a number of site visits were made during 1996 to assess the state-of-the-art in drilling for GHP loop installation. As an aid to quantifying the effect of various drilling-process improvements, we constructed a spread-sheet based on estimated time and material costs for all the activities required in a typical loop-field installation. By substituting different (improved) values into specific activity costs, the effect on total project costs can be easily seen. This report contains brief descriptions of the site visits, key points learned during the visits, copies of the spread-sheet, recommendations for further work, and sample results from sensitivity analysis using the spread-sheet.

Finger, J.T.; Sullivan, W.N.; Jacobson, R.D.; Pierce, K.G.

1997-09-01T23:59:59.000Z

474

Low-Cost, Robust, Threat-Aware Wireless Sensor Network for Assuring the Nation's Energy Infrastructure  

SciTech Connect (OSTI)

Eaton, in partnership with Oak Ridge National Laboratory and the Electric Power Research Institute (EPRI) has completed a project that applies a combination of wireless sensor network (WSN) technology, anticipatory theory, and a near-term value proposition based on diagnostics and process uptime to ensure the security and reliability of critical electrical power infrastructure. Representatives of several Eaton business units have been engaged to ensure a viable commercialization plan. Tennessee Valley Authority (TVA), American Electric Power (AEP), PEPCO, and Commonwealth Edison were recruited as partners to confirm and refine the requirements definition from the perspective of the utilities that actually operate the facilities to be protected. Those utilities have cooperated with on-site field tests as the project proceeds. Accomplishments of this project included: (1) the design, modeling, and simulation of the anticipatory wireless sensor network (A-WSN) that will be used to gather field information for the anticipatory application, (2) the design and implementation of hardware and software prototypes for laboratory and field experimentation, (3) stack and application integration, (4) develop installation and test plan, and (5) refinement of the commercialization plan.

Carols H. Rentel

2007-03-31T23:59:59.000Z

475

ReSS: Resource Selection Service for National and Campus Grid Infrastructure  

SciTech Connect (OSTI)

The Open Science Grid (OSG) offers access to around hundred Compute elements (CE) and storage elements (SE) via standard Grid interfaces. The Resource Selection Service (ReSS) is a push-based workload management system that is integrated with the OSG information systems and resources. ReSS integrates standard Grid tools such as Condor, as a brokering service and the gLite CEMon, for gathering and publishing resource information in GLUE Schema format. ReSS is used in OSG by Virtual Organizations (VO) such as Dark Energy Survey (DES), DZero and Engagement VO. ReSS is also used as a Resource Selection Service for Campus Grids, such as FermiGrid. VOs use ReSS to automate the resource selection in their workload management system to run jobs over the grid. In the past year, the system has been enhanced to enable publication and selection of storage resources and of any special software or software libraries (like MPI libraries) installed at computing resources. In this paper, we discuss the Resource Selection Service, its typical usage on the two scales of a National Cyber Infrastructure Grid, such as OSG, and of a campus Grid, such as FermiGrid.

Mhashilkar, Parag; Garzoglio, Gabriele; Levshina, Tanya; Timm, Steve; /Fermilab

2009-05-01T23:59:59.000Z

476

FORSCOM installation characterization and ranking for water efficiency improvement  

SciTech Connect (OSTI)

On March 11, 1994, President Clinton signed Executive Order 12902-Energy Efficiency and Water Conservation at Federal Facilities. Section 302 of the Executive Order calls for energy and water prioritization surveys of federal facilities to be conducted. The surveys will be used to establish priorities for conducting comprehensive facility audits. In response to the requirements of the Executive Order, the U.S. Army Forces Command (FORSCOM) has tasked Pacific Northwest Laboratory (PNL) to initiate a broad study of the water savings potential at each of its major installations. This report provides an assessment of the water, sewer, energy (for hot water production and pumping), and associated cost savings potential at ten of the major FORSCOM installations. This assessment is meant to be a {open_quotes}first pass{close_quotes} estimate of the water savings potential, to assist FORSCOM in prioritizing installations for detailed water audits and potential water efficient retrofits. In addition, the end uses (toilets, sinks, showerheads, irrigation, etc.) with the greatest water savings potential are identified at each installation. This report is organized in the following manner. Following this Introduction, Section 2 provides important background information pertaining to the water analysis. Section 3 describes the methodology employed in the analysis, and Section 4 summarizes the study results. Section 5 prioritizes the installations based on both water/sewer savings and cost associated with water, sewer, and energy savings. Section 6 provides recommendations on where to start detailed water audits, as well as other recommendations. References are listed in Section 7. The appendices provide specific information on the analysis results and methodology, along with a discussion of special issues.

Fitzpatrick, Q.K.; McMordie, K.L.; Di Massa, F.V. [and others

1995-05-01T23:59:59.000Z

477

Web Portal for Photonic Technologies Using Grid Infrastructures  

E-Print Network [OSTI]

The modeling of physical processes is an integral part of scientific and technical research. In this area, the Extendible C++ Application in Quantum Technologies (ECAQT) package provides the numerical simulations and modeling of complex quantum systems in the presence of decoherence with wide applications in photonics. It allows creating models of interacting complex systems and simulates their time evolution with a number of available time-evolution drivers. Physical simulations involving massive amounts of calculations are often executed on distributed computing infrastructures. It is often difficult for non expert users to use such computational infrastructures or even to use advanced libraries over the infrastructures, because they often require being familiar with middleware and tools, parallel programming techniques and packages. The P-RADE Grid Portal is a Grid portal solution that allows users to manage the whole life-cycle for executing a parallel application on the computing Grid infrastructures. The article describes the functionality and the structure of the web portal based on ECAQT package.

H. V. Astsatryan; T. V. Gevorgyan; A. R. Shahinyan

2013-01-09T23:59:59.000Z

478

An Engineering Information Service Infrastructure for Ubiquitous Computing  

E-Print Network [OSTI]

An Engineering Information Service Infrastructure for Ubiquitous Computing David Liu1 , Jinxing services. 1 Ph.D. Candidate, Department of Electrical Engineering, Stanford University, Stanford, CA 94305 easy access to various engineering information services. In terms of the standard ISO model

Stanford University

479

62 Bureau of Meteorology Annual Report 201314 Observations and infrastructure  

E-Print Network [OSTI]

resources in the taking and recording of observations. It strategically plans, builds and operates improving delivery efficiencies; and · facilitating both management and cultural change to ensure continued System Strategy; · Observing Network Operations; and · Infrastructure Management. The performance of each

Greenslade, Diana

480

I. INTRODUCTION Civil and critical infrastructure systems such as  

E-Print Network [OSTI]

System Engineering Research Center (PSERC) and by the Center for Electric Reliability Technology of scientific principles to the design, maintenance and improvement of the critical infrastructures in our triggered a process that is revolutionizing the concepts of reliability and risk. For example

Oren, Shmuel S.

Note: This page contains sample records for the topic "infrastructure evaluation installation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Our Nation's Energy Infrastructure: Toward Stronger and Smarter Grid  

E-Print Network [OSTI]

for Smart Customer Interface ­ Distribution Automation ­ Smart metering improves load models and profiles electrical energy infrastructure ­ Transforming the Network into a Smart Grid ­ Developing an Expanded Power Plants · Increasing energy efficiency #12;Enabling a Stronger and Smarter Grid ·Smart Grid

Amin, S. Massoud

482

The 5th Dimension: Building Blocks for Smart Infrastructures  

E-Print Network [OSTI]

artifact. Obviously, since the books only pass the energy field of the reader for a few seconds, any formThe 5th Dimension: Building Blocks for Smart Infrastructures Marc Langheinrich ETH Zurich Institute example of such an interaction in 5D would be the following scenario: two "smart" (i.e., tagged) books

483

SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES Qualification  

E-Print Network [OSTI]

For certification of Quality Management Systems: EN ISO 9001:2008 ­ Quality management systems - Requirements the ability to fulfill specified requirements (ISO 9000) #12;SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES Conformity Assessment Bodies ISO/IEC 17011 - Conformity assessment -- General

484

Air temperature regulation by urban trees and green infrastructure  

E-Print Network [OSTI]

Air temperature regulation by urban trees and green infrastructure Kieron Doick and Tony Hutchings to a UHI include the thermal properties, height and spacing of buildings, the production of waste heat, air years. An estimated 8­11 extra deaths occur each day for each degree increase in air temperature during

485

Downlink Traffic Scheduling in Green Vehicular Roadside Infrastructure  

E-Print Network [OSTI]

or prohibitive expense of wired electrical power. In these situations, an alternative to wired power connections D. Todd, George Karakostas and Dongmei Zhao Department of Electrical and Computer Engineering Mc of scheduling for energy efficient road-side infrastructure. In certain scenarios, vehicle locations can

Karakostas, George

486

Siemens Global Studio Project: Experiences Adopting an Integrated GSD Infrastructure  

E-Print Network [OSTI]

Siemens Global Studio Project: Experiences Adopting an Integrated GSD Infrastructure Mullick, N., Bass, M., El Houda, Z., and Paulish, D.J. Siemens Corporate Research, Inc Princeton, NJ Neel.Mullick, Matthew.Bass, Daniel.Paulish @Siemens.com Cataldo, M. and Herbsleb, J.D. Institute for Software Research

Herbsleb, James D.

487

Detection, Correlation, and Visualization of Attacks Against Critical Infrastructure Systems  

E-Print Network [OSTI]

, which in the case of control systems may impact physical processes causing environmental harm or injury architectures typical of control system implementations. Index Terms--critical infrastructure security, control.lastname@sri.com Abstract--Digital control systems are essential to the safe and efficient operation of a variety

Briesemeister, Linda

488

QER Public Meeting: New England Regional Infrastructure Constraints Part II  

Broader source: Energy.gov [DOE]

The Department of Energy will convene a public meeting to discuss and receive comments on issues related to the Quadrennial Energy Review. The purpose of the meeting is to examine energy infrastructure constraints in New England and regional approaches to addressing them

489

QER Public Meeting: New England Regional Infrastructure Constraints Part I  

Broader source: Energy.gov [DOE]

The Department of Energy will convene a public meeting to discuss and receive comments on issues related to the Quadrennial Energy Review. The purpose of the meeting is to examine energy infrastructure constraints in New England and regional approaches to addressing them

490

Enhancing Grid Infrastructures with Virtualization and Cloud Technologies  

E-Print Network [OSTI]

Enhancing Grid Infrastructures with Virtualization and Cloud Technologies Final Report on Stratus of the distribution for a turnkey private cloud solution aimed at SMEs and a large public deployment by Atos within and Technology Network S.A., SixSq S`arl, Telef´onica In- vestigaci´on y Desarrollo SA, and The Provost Fellows

Paris-Sud XI, Université de

491

Attack Containment Framework for Large-Scale Critical Infrastructures  

E-Print Network [OSTI]

Attack Containment Framework for Large-Scale Critical Infrastructures Hoang Nguyen Department-- We present an attack containment framework against value-changing attacks in large-scale critical structure, called attack container, which captures the trust behavior of a group of nodes and assists

Nahrstedt, Klara

492

Adapting Urban Infrastructure to Climate Change: A Drainage Case Study  

E-Print Network [OSTI]

models (GCM) to determine changes in the amount of precipitation for the 20-year, 24-h storm- cipitation magnitude and intensity, associated increases in runoff, storm water discharges, and floodingAdapting Urban Infrastructure to Climate Change: A Drainage Case Study Paul Kirshen, M.ASCE1

Vogel, Richard M.

493

SECTION 340 WRDA 1992, AS AMENDED ENVIRONMENTAL INFRASTRUCTURE  

E-Print Network [OSTI]

SECTION 340 ­ WRDA 1992, AS AMENDED ENVIRONMENTAL INFRASTRUCTURE SOUTHERN WEST VIRGINIA MODEL of six models for the provision of environmental assistance to non-Federal interests in southern West Virginia pursuant to Section 340 of the Water Resources Development Act of 1992, Public Law 102

US Army Corps of Engineers

494

Advanced Manufacturing Use Cases and Early Results in GENI Infrastructure  

E-Print Network [OSTI]

for controlling remote processes in manufacturing facilities. In addition, there is a need to suitably configureAdvanced Manufacturing Use Cases and Early Results in GENI Infrastructure Alex Berryman, Prasad to advanced manufacturing communities are exciting prospects due to the growth of the global marketplace

Calyam, Prasad

495

The Roles and Economic Impacts of Technology Infrastructure  

E-Print Network [OSTI]

The Roles and Economic Impacts of Technology Infrastructure (version 3) Gregory Tassey Senior billion in economic benefits. Beyond measurement activities within an industry, increased specialization the need for interoperability for a wide range of information flows. NIST economic studies have shown

496

Multistage Stochastic Programming Approach for Offshore Oilfield Infrastructure Planning  

E-Print Network [OSTI]

Multistage Stochastic Programming Approach for Offshore Oilfield Infrastructure Planning under is implemented in the GAMS grid computing environment. Computational results on a variety of oilfield development cycle of a typical offshore oilfield project consists of the following five steps: (1) Exploration

Grossmann, Ignacio E.

497

S E R I E S SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES  

E-Print Network [OSTI]

S E R I E S SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES COMMISSION General Committee Final workshop Ispra (IT), May 30 th, 2013 MAID project : Seismic behavior of L- and T-shaped unreinforced Masonry shear walls including Acoustic Isolation Devices #12;SEISMIC ENGINEERING RESEARCH

498

A Tool for Integrated Planning of Water Infrastructure Gwendolyn Woods  

E-Print Network [OSTI]

or inaccurate. Economy of scale for wastewater reclamation (treatment) facilities may conflict with the energy. Yet the need to plan for new water and wastewater infrastructure remains. In the Assessment of Climate Change in the Southwest United States: A Report Prepared for the National Climate Assessment, Theobald et

Fay, Noah

499

190 India Infrastructure Report 2006 URBAN ENERGY MANAGEMENT  

E-Print Network [OSTI]

to reach you news about your city and your area, especially to gauge when electricity might be restored190 India Infrastructure Report 2006 URBAN ENERGY MANAGEMENT Prem K. Kalra and Rajiv Shekhar 9 I ndia's cities are the engines of her economic growth. To provide an environment conducive to the buzz

Columbia University

500

Policy Issues Affecting Spatial Data Infrastructure Developments in the Netherlands  

E-Print Network [OSTI]

Policy Issues Affecting Spatial Data Infrastructure Developments in the Netherlands Professor Bas C of Technology, the Netherlands Bas_Kok@euronet.nl Bastiaan van Loenen, PhD candidate department of civil engineering and geo-sciences, geodetic engineering Delft University of Technology, the Netherlands b

Onsrud, Harlan J.