Powered by Deep Web Technologies
Note: This page contains sample records for the topic "information plant assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Spatially Informed Plant PRA Models for Security Assessment  

SciTech Connect

Traditional risk models can be adapted to evaluate plant response for situations where plant systems and structures are intentionally damaged, such as from sabotage or terrorism. This paper describes a process by which traditional risk models can be spatially informed to analyze the effects of compound and widespread harsh environments through the use of 'damage footprints'. A 'damage footprint' is a spatial map of regions of the plant (zones) where equipment could be physically destroyed or disabled as a direct consequence of an intentional act. The use of 'damage footprints' requires that the basic events from the traditional probabilistic risk assessment (PRA) be spatially transformed so that the failure of individual components can be linked to the destruction of or damage to specific spatial zones within the plant. Given the nature of intentional acts, extensive modifications must be made to the risk models to account for the special nature of the 'initiating events' associated with deliberate adversary actions. Intentional acts might produce harsh environments that in turn could subject components and structures to one or more insults, such as structural, fire, flood, and/or vibration and shock damage. Furthermore, the potential for widespread damage from some of these insults requires an approach that addresses the impacts of these potentially severe insults even when they occur in locations distant from the actual physical location of a component or structure modeled in the traditional PRA. (authors)

Wheeler, Timothy A. [Sandia National Laboratories, PO Box 5800, Albuquerque, NM 87185 (United States); Thomas, Willard [Omicron Safety and Risk Technologies, Inc., 2500 Louisiana Boulevard, Suite 410. Albuquerque, NM 87110 (United States); Thornsbury, Eric [U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001 (United States)

2006-07-01T23:59:59.000Z

2

Risk-informed assessment of regulatory and design requirements for future nuclear power plants. Annual report  

Science Conference Proceedings (OSTI)

OAK B188 Risk-informed assessment of regulatory and design requirements for future nuclear power plants. Annual report. The overall goal of this research project is to support innovation in new nuclear power plant designs. This project is examining the implications, for future reactors and future safety regulation, of utilizing a new risk-informed regulatory system as a replacement for the current system. This innovation will be made possible through development of a scientific, highly risk-formed approach for the design and regulation of nuclear power plants. This approach will include the development and/or confirmation of corresponding regulatory requirements and industry standards. The major impediment to long term competitiveness of new nuclear plants in the U.S. is the capital cost component--which may need to be reduced on the order of 35% to 40% for Advanced Light Water Reactors (ALWRS) such as System 80+ and Advanced Boiling Water Reactor (ABWR). The required cost reduction for an ALWR such as AP600 or AP1000 would be expected to be less. Such reductions in capital cost will require a fundamental reevaluation of the industry standards and regulatory bases under which nuclear plants are designed and licensed. Fortunately, there is now an increasing awareness that many of the existing regulatory requirements and industry standards are not significantly contributing to safety and reliability and, therefore, are unnecessarily adding to nuclear plant costs. Not only does this degrade the economic competitiveness of nuclear energy, it results in unnecessary costs to the American electricity consumer. While addressing these concerns, this research project will be coordinated with current efforts of industry and NRC to develop risk-informed, performance-based regulations that affect the operation of the existing nuclear plants; however, this project will go further by focusing on the design of new plants.

NONE

2000-08-01T23:59:59.000Z

3

Risk-Informed and Performance-Based Safety Culture Assessment Method for Nuclear Power Plants  

Science Conference Proceedings (OSTI)

This report provides an update of the risk management effectiveness assessment (RMEA) described in EPRI Report 1011761, Risk Management Effectiveness Assessment Application Guide. This update was performed to evaluate the capability of the RMEA to assess the effectiveness of the plant safety culture. The update considered results reported in the research literature since the 2005 publication of the application guide. It also evaluated the RMEA against the safety culture components identified by the U.S. ...

2008-12-09T23:59:59.000Z

4

Importance of Processing Plant Information  

U.S. Energy Information Administration (EIA)

... new survey instrument to collect information from natural gas processing plants during non-emergency and supply-emergency conditions. ...

5

Nuclear Energy Research Initiative. Risk Informed Assessment of Regulatory and Design Requirements for Future Nuclear Power Plants. Annual Report  

Science Conference Proceedings (OSTI)

The overall goal of this research project is to support innovation in new nuclear power plant designs. This project is examining the implications, for future reactors and future safety regulation, of utilizing a new risk-informed regulatory system as a replacement for the current system. This innovation will be made possible through development of a scientific, highly risk-informed approach for the design and regulation of nuclear power plants. This approach will include the development and.lor confirmation of corresponding regulatory requirements and industry standards. The major impediment to long term competitiveness of new nuclear plants in the U.S. is the capital cost component--which may need to be reduced on the order of 35% to 40% for Advanced Light Water Reactors (ALWRs) such as System 80+ and Advanced Boiling Water Reactor (ABWR). The required cost reduction for an ALWR such as AP600 or AP1000 would be expected to be less. Such reductions in capital cost will require a fundamental reevaluation of the industry standards and regulatory bases under which nuclear plants are designed and licensed. Fortunately, there is now an increasing awareness that many of the existing regulatory requirements and industry standards are not significantly contributing to safety and reliability and, therefore, are unnecessarily adding to nuclear plant costs. Not only does this degrade the economic competitiveness of nuclear energy, it results in unnecessary costs to the American electricity consumer. While addressing these concerns, this research project will be coordinated with current efforts of industry and NRC to develop risk-informed, performance-based regulations that affect the operation of the existing nuclear plants; however, this project will go farther by focusing on the design of new plants.

Ritterbusch, S.E.

2000-08-01T23:59:59.000Z

6

Importance of Processing Plant Information  

Reports and Publications (EIA)

This presentation provides information about the importance of information about natural gas processing plants, particularly during periods of natural gas supply disruption, such as hurricanes. It also provides information about a relatively new survey instrument to collect information from natural gas processing plants during non-emergency and supply-emergency conditions.

Information Center

2009-06-22T23:59:59.000Z

7

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

risk assessment information used to evaluate and remediate legacy contamination from the Manhattan Project. The RAIS was designed to provide all risk assessment processes in a...

8

Plant Wide Assessment for SIFCO Industries, Inc.  

Science Conference Proceedings (OSTI)

Sifco Industries carreid out a plant wide energy assessment under a collaborative program with the U.S. Department of Energy during October 2004 to September 2005. During the year, personnel from EIS, E3M, DPS, BuyCastings.Com, and Sifco plant facilities and maintenance personnel, as a team collected energy use, construction, process, equipment and operational information about the plant. Based on this information, the team identified 13 energy savings opportunities. Near term savings opportunities have a total potential savings of about $1,329,000 per year and a combined simple payback of about 11 months. Implementation of these recommendations would reduce CO2 emissions by about 16,000,000 pounds per year, which would reduce overall plant CO2 emissions by about 45%. These totals do not include another $830,000 per year in potential savings with an estimated 9-month payback, from converting the forging hammers from steam to compressed air.

Kelly Kissock, Arvind Thekdi et. al.

2005-07-06T23:59:59.000Z

9

Independent Oversight Assessment, Pantex Plant - November 2012 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pantex Plant - November 2012 Pantex Plant - November 2012 Independent Oversight Assessment, Pantex Plant - November 2012 November 2012 Assessment of Nuclear Safety Culture at the Pantex Plant The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent assessment of nuclear safety culture at the Pantex Plant. The primary objective of the evaluation was to provide information regarding the status of the safety culture at the Pantex Plant. The data collection phase of the assessment occurred during June - August 2012. The safety culture evaluation performed by the external independent safety culture experts is provided in Appendix B, which provides positive observations and identifies areas in need of attention for each of the nine

10

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Plant: Relative Risk Ranking Sites Plant: Relative Risk Ranking Sites These rankings are based on the EM-40 Release Site Methodology. Select a release site to receive information concerning that site. Please note that not all of the listed sites are linked to further information. Abandoned Nitric Acid Pipeline ACN Drum Yard Bear Creek Burial Grounds Bear Creek Contaminated Floodplain Soils Beta-4 Security Pits Building 81-10 Area Mercury Contaminated Soils Building 9201-2 Transformer and Capacitor Storage Area Building 9201-3 Coolant Salt Technology Facility Building 9201-4 Building 9201-4 External Pipes Building 9201-5E Northeast Yard Waste Storage Area Building 9202 East Pad Waste Storage Area Building 9204-2 West Yard Waste Storage Area Building 9206 Underground Tank Building 9215 West Pad Waste Storage Area

11

Climate VISION: Resources and Links - Plant Assessments  

Office of Scientific and Technical Information (OSTI)

Plant Assessments Plant Assessments Plant-Wide Assessments Plant-wide assessments are one way to work with the DOE Industrial Technologies Program—most companies realize a minimum of $1 million in annual energy savings after just one assessment. Plants are selected through a competitive solicitation process, and agree to a minimum 50% cost-share for implementing the assessment. An industry-defined team conducts an on-site analysis of total energy use and identifies opportunities to save energy in your overall operations and in motor, steam, compressed air, and process heating systems. The recommendations could include implementing emerging technologies that would be particularly effective in your operation. These emerging technologies, although on the forefront of industrial manufacturing, are successful and commercially

12

Importance of Processing Plant Information  

U.S. Energy Information Administration (EIA)

During an Emergency. 12. Department of Energy Situation Reports During an Energy Emergency. 13. Why Survey Natural Gas Processing Plants? 14.

13

The renewable electric plant information system  

DOE Green Energy (OSTI)

This report explains the procedures used for creating the Renewable Electric Plant Information System (REPiS) database, describes the database fields, and summarizes the data. The REPiS database contains comprehensive information on grid-connected renewable electric generation plants in the United States. Originally designed in 1987 and updated in 1990, the database includes information through 1994. The report also illustrates ways of using the data for analysis is and describes how researchers validated the data.

Sinclair, K.

1995-12-01T23:59:59.000Z

14

Tiger Team assessment of the Pinellas Plant  

Science Conference Proceedings (OSTI)

This Document contains findings identified during the Tiger Team Compliance Assessment of the Department of Energy's (DOE's) Pinellas Plant, Pinellas County, Florida. The assessment wa directed by the Department's Office of Environment, Safety, and Health (ES H) from January 15 to February 2, 1990. The Pinellas Tiger Team Compliance Assessment is comprehensive in scope. It covers the Environment Safety and Health, and Management areas and determines the plant's compliance with applicable Federal (including DOE), State, and local regulations and requirements.

Not Available

1990-05-01T23:59:59.000Z

15

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Frequently Asked Questions Frequently Asked Questions This page represents the most commonly approached topics from our users. What internet browser works best for the RAIS? We attempt to accommodate every browser. If there is a problem viewing the RAIS pages or downloading items, let us know what browser you are using and we will try and fix the problem. How can I use the information on the RAIS? The information on the RAIS can be used for teaching material and performing risk assessments that comply with EPA guidance. Feel free to use the information; it is available to the public. However, please give proper credit to the RAIS and the team from Oak Ridge National Laboratory and The University of Tennessee where you see fit. Also, the databases we maintain are updated on a quarterly basis or sooner, so you may need to "time-stamp"

16

Assessing Energy Use in Your Plant  

SciTech Connect

This DOE Industrial Technologies Program fact sheet describes ITP resources and software that industrial plants can use for energy assessments that result in greater energy efficiency and lower costs.

2006-02-01T23:59:59.000Z

17

Assessment of Amines for Fossil Plant Applications  

Science Conference Proceedings (OSTI)

The purity and proper chemical treatment of water and steam are central to ensuring fossil and heat recovery steam generator (HRSG) plant component availability and reliability, which are critical to the overall economic performance and profitability of plant unit operations. This report provides a technical assessment of neutralizing amines for application in plant cycles to improve the pH conditions in the low pressure (LP) evaporators and economizers of HRSGs, the phase transition zone (PTZ) of the LP...

2010-03-31T23:59:59.000Z

18

Coal Power Plant Database | Open Energy Information  

Open Energy Info (EERE)

Power Plant Database Power Plant Database Jump to: navigation, search Name Coal Power Plant Database Data Format Excel Spreadsheet, Excel Pivot Table, Access Database Geographic Scope United States TODO: Import actual dataset contents into OpenEI The Coal Power Plant Database (CPPDB) is a dataset which "consolidates large quantities of information on coal-fired power plants in a single location."[1] It is produced by the National Energy Technology Laboratory (NETL). External links 2007 Edition Excel Spreadsheet Excel Pivot Table Access Database User's Manual (PDF) References ↑ "User's Manual: Coal Power Plant Database" Retrieved from "http://en.openei.org/w/index.php?title=Coal_Power_Plant_Database&oldid=273301" Categories: Datasets Articles with outstanding TODO tasks

19

Heber Plant Geothermal Facility | Open Energy Information  

Open Energy Info (EERE)

Plant Geothermal Facility Plant Geothermal Facility Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Heber Plant Geothermal Facility General Information Name Heber Plant Geothermal Facility Facility Heber Plant Sector Geothermal energy Location Information Location Imperial Valley, California Coordinates 33.03743°, -115.621591° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.03743,"lon":-115.621591,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

20

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Technical Memorandum , Part II. Screening Level Risk Assessment 92-225-161-49 K-33 Cooling Towers screening risk assessments (2) K-770 sites screening risk assessment (9...

Note: This page contains sample records for the topic "information plant assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Proceedings: EPRI/NEI Technical Information Workshop - Nuclear Plant Groundwater Monitoring  

Science Conference Proceedings (OSTI)

The EPRI Groundwater Protection Workshop focused on the subject of groundwater monitoring related to nuclear plant sites. This subject is very important to both decommissioning and operating plants. The Workshop provided information to assist operating plants in the development of technically sound plant site groundwater monitoring programs. Presentations provided the latest information on groundwater assessments, such as related tools, strategies, technologies and experience. The program included inform...

2007-07-19T23:59:59.000Z

22

Surry Seismic Probabilistic Risk Assessment Pilot Plant Review  

Science Conference Proceedings (OSTI)

The American Society of Mechanical Engineers (ASME) and the American Nuclear Society (ANS) have developed the "Standard for Level 1/Large Early Release Frequency Probabilistic Risk Assessment for Nuclear Power Plant Applications." The objective of the standard is to provide basic requirements for performing probabilistic risk assessments (PRAs) that would support future risk-informed decisions. The standard limits its requirements to performing a Level 1 analysis of the core damage frequency and a limite...

2010-07-16T23:59:59.000Z

23

Draft environmental assessment: Ocean Thermal Energy Conversion (OTEC) Pilot Plants  

DOE Green Energy (OSTI)

This Environmental Assessment (EA) has been prepared, in accordance with the National Environmental Policy Act of 1969, for the deployment and operation of a commercial 40-Megawatt (MW) Ocean Thermal Energy Conversion (OTEC) Pilot Plant (hereafter called the Pilot Plant). A description of the proposed action is presented, and a generic environment typical of the candidate Pilot Plant siting regions is described. An assessment of the potential environmental impacts associated with the proposed action is given, and the risk of credible accidents and mitigating measures to reduce these risks are considered. The Federal and State plans and policies the proposed action will encompass are described. Alternatives to the proposed action are presented. Appendix A presents the navigation and environmental information contained in the US Coast Pilot for each of the candidate sites; Appendix B provides a brief description of the methods and calculations used in the EA. It is concluded that environmental disturbances associated with Pilot Plant activities could potentially cause significant environmental impacts; however, the magnitude of these potential impacts cannot presently be assessed, due to insufficient engineering and environmental information. A site- and design-specific OTEC Pilot Plant Environmental Impact Statement (EIS) is required to resolve the potentially significant environmental effects associated with Pilot Plant deployment and operation. (WHK)

Sullivan, S.M.; Sands, M.D.; Donat, J.R.; Jepsen, P.; Smookler, M.; Villa, J.F.

1981-02-01T23:59:59.000Z

24

Industrial Assessments and Why Your Plant Should Have One  

E-Print Network (OSTI)

The "in-depth" assessment of a plant site and its facilities, services and manufacturing operations can help you make your plant cleaner, more productive and more energy efficient. This paper discusses the components of a successful assessment, what you can expect, and how you can benefit. The U.S. Department of Energy (DOE) Industrial Assessment Center Program, its track record and its approach, are described in some detail -including the criteria for receiving an assessment through the Program. The authors also identify and describe other good sources of industrial assessment assistance- such as utilities, state offices, trade and professional associations and local engineering schools. Also described are ways to use your in-house staff and, if you are a multi-plant company, peer reviews to conduct assessments. To further help you with the assessment process, a variety of tools and programs that you can easily access are described. The paper also provides information on a range of related resources including: programs which focus on specific technologies like motors or steam/compressed air; databases with specific assessment recommendations by Standard Industrial Classification (SIC) Code that you can access; self assessment workbooks and manuals; programs which offer grants (on a competitive basis) for new demonstrations of clean industrial technologies; software programs; guidelines, and more.

Glaser, C. J.; Demetrops, J. P.

1998-04-01T23:59:59.000Z

25

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

in the earth's crust. In the environment, arsenic is combined with oxygen, chlorine, and sulfur to form inorganic arsenic compounds. Arsenic in animals and plants...

26

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Radionuclide Decay Chain Radionuclide Decay Chain Using the Radionuclide Decay Chain Tool Click on the steps below for detailed instructions about each page of the Radionuclide Chain Tool. 1. Select Isotope 2. Decay Chain Table 3. Decay Chain Animation 1. Select Isotope Select the isotope of interest and click the "Submit" button. 2. Decay Chain Table A table of the ICRP 107 decay chain appears that displays the parent and all daughters in the decay chain through the stable isotope(s). The half-life, decay modes, and the branching fractions are given. Decay chains that are repeated as a result of multiple branching fractions are only presented once in the table. Text below the decay chain table contains decay mode definitions and further information on the daughters included in the +D slope factors for risk assessment purposes. A back button is provided to return to the main page. To watch an animated representation of the decay process, click the link "Click for visual diagram."

27

Integrated Assessment | Open Energy Information  

Open Energy Info (EERE)

Integrated Assessment Integrated Assessment Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Integrated Assessment: Mainstreaming sustainability into policymaking--A guidance manual Agency/Company /Organization: United Nations Environment Programme Topics: Background analysis Website: www.unep.ch/etb/publications/AI%20guidance%202009/UNEP%20IA%20final.pd Equivalent URI: cleanenergysolutions.org/content/times-integrated-assessment-model-0,h Language: English Policies: Deployment Programs DeploymentPrograms: Technical Assistance References: Integrated Assessment[1] The Times Integrated Assessment Model (TIAM) comprises several thousand technologies in all sectors of the energy system. It is characterized by several technical and economic parameters and by emission coefficients for

28

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Risk Assessment Documents - ORR Risk Assessment Documents - ORR Bullet Baseline Risk Assessments Bullet Remedial Investigation/Feasibility Study Environmental Assessment Report South Campus Facility, Oak Ridge Tenn [DOE/OR/02-1274&D] Bullet Baseline Risk Assessment for Lower East Fork Poplar Creek [DOE/OR/1119 & D2 & V2] Bullet Remedial Investigation/ Feasibility Study Report for Lower Watts Bar Reservoir Operable Unit [DOE/OR/01 1282 & D1] [ORNL/ER-2] Bullet The Utility of Existing Data Conducting a CERCLA Baseline Risk Assessment for Lower Watts Bar Reservoir (draft) [ORNL/ER-?] Bullet East Fork Poplar Creek Sewer Line Beltway Remedial Investigation Report [DOE/OR/02-1119&D2] Bullet Screening Risk Assessments Bullet Preliminary Assessment of Radiation Doses to the Public from Cesium

29

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Debra Stewart at (865)482-2657 or dthomas3@utk.edu. Risk assessments conducted for the DOE-ORO should implement Guidance for Conducting Risk Assessments and Related Risk...

30

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

(Morton et al. 1976). In a study conducted by Goodwin (1972), the thymol turbidity test was used to measure the irritant effect of TNT on the liver of munition plant...

31

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

from the production and use of 1,1,2-trichloroethane as well as volatilization from wastewater and municipal treatment plants. Releases to soil are expected to result from...

32

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

discharged into surface waters by various industries and accumulated in soils from the fallout emissions from coal-fired power plants. The increasing cost of the metal, however, is...

33

Gaseous Diffusion Plant Production Workers Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Gaseous Diffusion Plants Department of Energy Gaseous Diffusion Plants Phase I: Needs Assessment Robert Wages Oil, Chemical and Atomic Inte national Union Steven Markowitz Mount Sinai School of Medicine Sylvia Kieding Oil, Chemical and Atomic International Union Mark Griffon University of Massachusetts Lowell Elizabeth Averill Samaras Alice Hamilton College October 1, 1997 TABLE OF CONTENTS Page Number Executive Summary 1 J: OVERVIEW 1. Introduction 2-3 2. Methods 3-8 3. Principal Findings 9-16 4. Need for Medical Surveillance and Risk Communication 16-17 PART II: METHODOLOGY AND RESULTS 4. Exposure Assessment Appendix A Appendix B Appendix C 5. Focus Group Results Appendix A Appendix B Appendix C 6. Epidemiology and Other Health Studies EXECUTIVE SUMMARY Purpose We report the results and analysis of a one year needs assessment study evaluating

34

Assess Oportunities | Open Energy Information  

Open Energy Info (EERE)

Assess Oportunities Assess Oportunities Jump to: navigation, search Stage 3 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities Develop_BAU Stage 4: Prioritizing and Planning for Actions Begin execution of implementation plans 1.0. Organizing the LEDS Process 1.1. Institutional Structure for LEDS 1.2. Workplan to Develop the LEDS 1.3. Roles and responsibilities to develop LEDS 2.1. Assess current country plans, policies, practices, and capacities 2.2. Compile lessons learned and good practices from ongoing and previous sustainable development efforts in the country 2.3. Assess public and private sector capacity to support initiatives 2.4. Assess and improve the national GHG inventory and other economic and resource data as needed for LEDS development

35

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Guidance for Conducting Risk Assessments and Related Risk Activities for the DOE-ORO Environmental Management Program. BJCOR-271 Guidance for Treatment of Variability and...

36

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

011B. Office of Research and Development, Washington, D.C. 1992. Exposure Factors Handbook. EPA6008- 89043. Office of Health and Environmental Assessment, Washington, D.C....

37

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. EPA, Washington, D.C. 1992. Risk Assessment Forum. Wildlife Exposure Factors Handbook. Vol. I. United Staes Environmental Protection Agency. Office of Research and...

38

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

a member of the Chemical Hazard Evaluation Group in the Biomedical and Environmental Information Analysis Section, Health Sciences Research Division, Oak Ridge National...

39

Fire models for assessment of nuclear power plant fires  

SciTech Connect

This paper reviews the state-of-the-art in available fire models for the assessment of nuclear power plants fires. The advantages and disadvantages of three basic types of fire models (zone, field, and control volume) and Sandia's experience with these models will be discussed. It is shown that the type of fire model selected to solve a particular problem should be based on the information that is required. Areas of concern which relate to all nuclear power plant fire models are identified. 17 refs., 6 figs.

Nicolette, V.F.; Nowlen, S.P.

1989-01-01T23:59:59.000Z

40

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Risk Assessment Documents Risk Assessment Documents ORNL RA Graphic Results ORNL Baseline Risk Assessment Results ORNL Screening Risk Assessment Results ORNL Other Risk Assessment Results ORNL RA Graphic Results WAG 2 Residential Landuse Sediment - Total Risk Sediment - Cesium 137 Risk Sediment - Cobalt 60 Risk Surface Water - Total Hazard Surface Water - Total Risk Surface Water - Strontium 90 Risk Surface Water - Tritium Risk Recreational Landuse Sediment - Total Risk Sediment - Cesium 137 Risk Sediment - Cobalt 60 Risk Surface Water - Total Hazard Surface Water - Total Risk Surface Water - Strontium 90 Risk Surface Water - Tritium Risk Recreational Landuse (No Fish) Surface Water - Total Hazard Surface Water - Total Risk Surface Water - Strontium 90 Risk Surface Water - Tritium Risk Industrial Landuse

Note: This page contains sample records for the topic "information plant assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Risk Assessment Documents Risk Assessment Documents Y-12 RA Graphic Results Y-12 Baseline Risk Assessment Results Y-12 Screening Risk Assessment Results Bullet Graphic Risk Results Arrow Bear Creek Valley Maps Residential Landuse Groundwater - Total Hazard (range: 1 - 900) Groundwater - Total Hazard (range: 0.1 - 1) Groundwater - Total Risk (range: 10-4 - 1) Groundwater - Total Risk (range: 10-5 - 10-4) Groundwater - Total Risk (range: 10-6 - 10-5) Groundwater - Dichloroethane, 1,1- Hazard Groundwater - Dichloroethene, 1,1- Hazard Groundwater - Dichloroethene, 1,1- Risk Groundwater - Dichloroethane, 1,2- Risk Groundwater - Dichloroethene, 1,2- Hazard Groundwater - Nitrate Hazard Groundwater - Radium Risk Groundwater - Technetium-99 Risk Groundwater - Tetrachloroethene Hazard Groundwater - Tetrachloroethene Risk

42

ENVIRONMENTAL ASSESSMENT FOR OTEC PILOT PLANTS  

SciTech Connect

Logical and orderly progression of the OTEC program from conceptual designs through component testing to the goal of commercially viable OTEC plants require that the socio-legal requirements be met and the proper operating permits be obtained and maintained. This function is accomplished in a series of activities including: (1) Development and annual revision of a published OTEC Environmental Development Plan (EDP); (2) Compliance with NEPA/EPA and other regulatory requirements; and (3) Studies and research in support of the above. The Environmental Development Plan (EDP) lists the concerns, outlines the program to consider the effects and validity of such concerns on the OTEC program, and gives the time-table to meet the schedule, integrated with that of the engineering and design programs. The schedules of compliance activities and, to a lesser degree, research also are governed by the development progress of the technology. However, because of the lead time necessary to insure proper review the appropriate regulatory agencies, the environmental assessment program for the OTEC pilot plants (initially starting with the 10/40 MWe unit) is founded on the strategy of progressive improvement of previously accepted documentation. Based on experience with OTEC-1, the procedure for pilot plants will be: (1) Produce generic Environmental Assessment (EA) at the appropriate level of technology in advance of hardware contract; (2) Produce generic Environmental Impact Statement (EIS) at approximately the same time as the hardware procurement; (3) Monitor production of site specific supplement to the generic EIS prepared by the hardware contractor; (4) Assist pilot plant operator in applying and obtaining permits by providing current research and modeling data; (5) Monitor environmental program as required by regulatory agency; and (6) Use new site data for refining models for future pilot plant. assessments.

Wilde, P.

1980-06-01T23:59:59.000Z

43

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Graphic Results Graphic Results Baseline Risk Assessment Results Screening Risk Assessment Results Other Risk Assessment Results Graphic Results K-25 Groundwater Residential Landuse Bedrock Wells - Total Hazard (range: 1-30) Bedrock Wells - Total Hazard (range: 0.1 - 1) Bedrock Wells - Total Risk Bedrock Wells - Arsenic Risk Bedrock Wells - Dichloroethene, 1,1- Risk Bedrock Wells - Trichloroethene Risk Unconsolidated Wells - Total Hazard (range: 1-150) Unconsolidated Wells - Total Hazard (range: 0.1 - 1) Unconsolidated Wells - Total Risk (range:10-4 - 1) Unconsolidated Wells - Total Risk (range:10-6 - 10-4) Unconsolidated Wells - Arsenic Risk Unconsolidated Wells - Trichloroethene Risk ORNL WAG 2 Residential Landuse Sediment - Total Risk Sediment - Cesium 137 Risk Sediment - Cobalt 60 Risk

44

Radiological Assessment of effects from Fukushima Daiichi Nuclear Power Plant  

Energy.gov (U.S. Department of Energy (DOE))

NNSA presentation on Radiological Assessment of effects from Fukushima Daiichi Nuclear Power Plant from May 13, 2011

45

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

ETTP: Relative Risk Ranking Sites ETTP: Relative Risk Ranking Sites These rankings are based on the EM-40 Release Site Methodology. Select a release site to receive information concerning that site. Please note that not all of the listed sites are linked to further information. 518 Main Substation 600 Series Oil Storage Area 695/687 Oil Storage Operations Building 523 Grease {Burial Site} Building 526 Heavy Equipment Shop Building 569 Heavy Equipment Shop Building 665 Steam Shed Building F-29 Gasoline Station Demolition Materials Placement Area Duct Island Road F-05 Laboratory Burial Ground F-07 Material Warehouse F-08 Laboratory Flannagans Loop Road Groundwater Plume Centered Under North Side of K-1070-C/D Groundwater Plume Emanating from K-1401 Acid Line Groundwater Plume near Mitchell Branch Groundwater Plume Originating from K-1420 Building

46

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Chemical Profile Tool Chemical Profile Tool Using the Chemical Data Profiles Tool Click on the steps below for detailed instructions about each page of the Chemical Data Profiles Tool. 1. Select Chemical 2. Chemical Profile 1. Select Chemical Select the chemical of interest and click "submit". 2. Chemical Profile Basic information for the chemical is shown in the first section. Next, toxicity infomation (Oral RfDs, Inhalation RfCs, and Cancer Toxicity Values) is displayed in tables filled with data from IRIS, PPRTV, ATSDR, CALEPA, and HEAST. The last section contains an extensive list of parameters for the chemical followed by tables of parameters from EPI, CRC, PERRY, LANGE, and YAWS. Hover over the source to see more information. The "Back" button can be used to view a different chemical profile.

47

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

ORR Offsite: Relative Risk Ranking Sites ORR Offsite: Relative Risk Ranking Sites These rankings are based on the EM-40 Release Site Methodology. Select a release site to receive information concering that site. Please note that not all of the listed sites are linked to further information. Animal Burial Site I Animal Burial Site II Animal Burial Site III Atomic City Auto Parts - Contaminated Creek Sediments Atomic City Auto Parts - Contaminated Soils Atomic City Auto Parts - Surface Debris Clinch River/Poplar Creek CSX Railroad David Witherspoon, Inc., 1630 Site David Witherspoon, Inc., 901 Site Low Dose Rate Irradiation Facility (LDRIF) Lower East Fork Poplar Creek - Bruner Site Lower East Fork Poplar Creek - NOAA Site Lower Watts Bar Reservoir Oak Ridge Tool Engineering, Inc. Solway Drums Site Swine Waste Lagoons

48

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Sites Sites These rankings are based on the EM-40 Release Site Methodology. Select a release site to receive information concerning that site. Please note that not all of the listed sites are linked to further information. Big Bayou Creek Big Bayou Creek Monitoring Station C-100 South Side Berm C-100 Trailer Complex Soil Contamination C-200 Underground Gasoline Tanks (UST) C-304 Bldg/HVAC Piping System (Soil Backfill) C-310 PCB Soil Contamination (West Side) C-331 PCB Soil Contamination (Southeast) C-331 PCB Soil Contamination (West) C-331 RCW Leak East Side C-331 RCW Leak Northwest Side C-333-A Vaporizer C-333 PCB Soil Contamination C-333 Cooling Tower Scrap Wood Pile C-333 PCB Soil Contamination (West) C-333 PCB Waste Storage Area C-333A Sewage Treatment Aeration Tank

49

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

ORNL: Relative Risk Ranking Sites ORNL: Relative Risk Ranking Sites These rankings are based on the EM-40 Release Site Methodology. Select a release site to receive information concerning that site. Please note that not all of the listed sites are linked to further information. 3001 Storage Canal (OGR) 3517 Filter Pit (Fission Product Development Laboratory) Abandoned Burn Pit Abandoned Sanitary Waste Pipeline and Septic Tank N of 7917 Abandoned Underground Waste Oil Storage Tank 7002A Above-ground Demineralized-water Holding Tanks Aircraft Reactor Experiment Contaminated Tool Storage Aircraft Reactor Experiment Surface Impoundment Buried Scrap Metal Area C-14 Allocation in White Oak Trees C-14 Allocation in White Pine Trees C-14 Allocation in Woody Biomass Plantation Species C-14 Efflux in Yellow Poplar Stand

50

Global Forest Resource Assessment | Open Energy Information  

Open Energy Info (EERE)

Global Forest Resource Assessment Global Forest Resource Assessment Jump to: navigation, search Tool Summary Name: Global Forest Resource Assessment Agency/Company /Organization: Food and Agriculture Organization of the United Nations Sector: Land Focus Area: Forestry Topics: Resource assessment Resource Type: Publications Website: www.fao.org/forestry/fra/fra2010/en/ Global Forest Resource Assessment Screenshot References: Global Forest Research Assessment[1] Overview "FAO, in cooperation with its member countries, has monitored the world's forests at 5 to 10 year intervals since 1946. These global assessments provide valuable information to policy-makers in countries, to international negotiations, arrangements and organizations related to forests and to the general public. The Global Forest Resources Assessment

51

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Area CPM User's Guide Area CPM User's Guide 1. Introduction Field sampling has the potential to be an extremely time-consuming and expensive portion of a radiological site remediation. Collected samples must be shipped to an off-site laboratory or counted in an on-site mobile unit in order to establish areas of contamination and to ensure that acceptable residual levels of contaminants remain. The Area CPM Calculator is a web-based calculator that estimates a gamma detector response for a target level of surface contamination. This calculator provides a rapid, exceptionally cost-effective assessment of contamination and cleanup standards based on field instrument data, which minimizes the use of more expensive sample collection and laboratory analysis. A correction factor for cpm analysis established between this

52

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Glossary of Environmental Restoration Terms Glossary of Environmental Restoration Terms These definitions are from the United States Department of Energy (DOE) Oak Ridge Operations Office (ORO) Environmental Restoration/Waste Management Risk Assessment Program staff and affiliates and the following sources: Click on the letter that begins the term for which you are searching. To search for another term, at the end of each definition, click on the. If a link leaves the glossary to go to an outside page you will see a. A B C D E F G H I J K L M N O P Q R S T U V W X Y Z A Abatement: The reduction in degree or intensity of pollution. Absorbed Dose: The energy imparted to a unit mass of matter by ionizing radiation. The unit of absorbed dose is the rad or gray. One rad equals 100 ergs per gram. The amount of a substance absorbed into the body, usually

53

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Condensed Toxicity Summary for METHYLENE CHLORIDE Condensed Toxicity Summary for METHYLENE CHLORIDE NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. September 1993 Prepared by Cheryl B. Bast, Ph.D., Chemical Hazard Evaluation and Communication Program, Biomedical and Environmental Information Analysis Section, Health Sciences Research Division, *, Oak Ridge, Tennessee. Prepared for OAK RIDGE RESERVATION ENVIRONMENTAL RESTORATION PROGRAM. *Managed by Martin Marietta Energy Systems, Inc., for the U.S. Department of Energy under contract No. DE-AC05-84OR21400. Methylene chloride (CH2Cl2, CAS No. 75-09-2), also known as dichloromethane

54

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

SELENIUM SELENIUM NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. MARCH 1993 Prepared by: Dennis M. Opresko, Ph.D, Chemical Hazard Evaluation Group, Biomedical Environmental Information Analysis Section, Health and Safety Research Division, Oak Ridge National Laboratory*, Oak Ridge, Tennessee. Prepared for: Oak Ridge Reservation Environmental Restoration Program. *Managed by Martin Marietta Energy Systems, Inc., for the U.S. Department of Energy under Contract No. DE-AC05-84OR21400. Selenium is an essential trace element important in many biochemical and physiological processes including the biosynthesis of coenzyme Q (a

55

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Condensed Toxicity Summary for MOLYBDENUM Condensed Toxicity Summary for MOLYBDENUM NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. JANUARY 1993 Prepared by: Dennis M. Opresko, Ph.D., Chemical Hazard Evaluation Group, Biomedical and Environmental Information Analysis Section, Health and Safety Research Division, *, Oak Ridge, Tennessee. Prepared for: Oak Ridge Reservation Environmental Restoration Program. *Managed by Martin Marietta Energy Systems, Inc., for the U.S. Department of Energy under Contract No. DE-AC05-84OR21400. Molybdenum (Mo) occurs naturally in various ores; the principal source being molybdenite (MoS2) (Stokinger, 1981). Molybdenum compounds are used

56

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

XYLENE XYLENE NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. EXECUTIVE SUMMARY 1. INTRODUCTION 2. METABOLISM AND DISPOSITION 2.1 ABSORPTION 2.2 DISTRIBUTION 2.3 METABOLISM 2.4 EXCRETION 3. NONCARCINOGENIC HEALTH EFFECTS 3.1 ORAL EXPOSURES 3.2 INHALATION EXPOSURES 3.3 OTHER ROUTES OF EXPOSURE 3.4 TARGET ORGANS/CRITICAL EFFECTS 4. CARCINOGENICITY 4.1 ORAL EXPOSURES 4.2 INHALATION EXPOSURES 4.3 OTHER ROUTES OF EXPOSURE 4.4 EPA WEIGHT-OF-EVIDENCE 4.5 CARCINOGENICITY SLOPE FACTORS 5. REFERENCES September 1994 Prepared by Carol S. Forsyth, Ph.D. and Rosmarie A. Faust, Ph.D., Chemical Hazard Evaluation Group, Biomedical and Environmental Information Analysis

57

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

LITHIUM LITHIUM NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. May 1995 Prepared by Dennis M. Opresko, Ph.D., Chemical Hazard Evaluation and Communication Program, Biomedical and Environmental Information Analysis Section, Health Sciences Research Division, *, Oak Ridge, Tennessee. Prepared for OAK RIDGE RESERVATION ENVIRONMENTAL RESTORATION PROGRAM. *Managed by Martin Marietta Energy Systems, Inc., for the U.S. Department of Energy under contract No. DE-AC05-84OR21400. Lithium is an alkali metal similar to magnesium and sodium in its properties (Birch, 1988; Arena, 1986) and has a molecular weight of 6.941

58

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Condensed Toxicity Summary for ALUMINUM Condensed Toxicity Summary for ALUMINUM NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. September 1993 Prepared by Cheryl B. Bast, Chemical Hazard Evaluation Group, Biomedical Environmental Information Analysis Section, Health Sciences Research Division, *, Oak Ridge, Tennessee. Prepared for OAK RIDGE RESERVATION ENVIRONMENTAL RESTORATION PROGRAM. *Managed by Martin Marietta Energy Systems, Inc., for the U.S. Department of Energy under Contract No. DE-AC05-84OR21400. Aluminum is a silver-white flexible metal with a vast number of uses. It is poorly absorbed and efficiently eliminated; however, when absorption does

59

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

ARSENIC ARSENIC NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. EXECUTIVE SUMMARY 1. INTRODUCTION 2. METABOLISM AND DISPOSITION 2.1 ABSORPTION 2.2 DISTRIBUTION 2.3 METABOLISM 2.4 EXCRETION 3. NONCARCINOGENIC HEALTH EFFECTS 3.1 ORAL EXPOSURES 3.2 INHALATION EXPOSURES 3.3 OTHER ROUTES OF EXPOSURE 3.4 TARGET ORGANS/CRITICAL EFFECTS 4. CARCINOGENICITY 4.1 ORAL EXPOSURES 4.2 INHALATION EXPOSURES 4.3 OTHER ROUTES OF EXPOSURE 4.4 EPA WEIGHT-OF-EVIDENCE 4.5 CARCINOGENICITY SLOPE FACTORS 5. REFERENCES April 1992 Prepared by: Dennis M. Opresko, Ph.D., Chemical Hazard Evaluation and Communication Group, Biomedical and Environmental Information Analysis

60

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Formal Toxicity Summary for SULFATE Formal Toxicity Summary for SULFATE NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. EXECUTIVE SUMMARY 1. INTRODUCTION 2. METABOLISM AND DISPOSITION 3. NONCARCINOGENIC HEALTH EFFECTS 3.1 ORAL EXPOSURES 3.2 INHALATION EXPOSURES 3.3 OTHER ROUTES OF EXPOSURE 3.4 TARGET ORGANS/CRITICAL EFFECTS 4. CARCINOGENICITY 5. REFERENCES JUNE 1991 Prepared by: Cheryl Bast, Chemical Hazard Evaluation and Communication Group, Biomedical and Environmental Information Analysis Section, Health and Safety Research Division, Oak Ridge National Laboratory*, Oak Ridge, Tennessee. Prepared for: Oak Ridge Reservation Environmental Restoration Program.

Note: This page contains sample records for the topic "information plant assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

LEAD LEAD NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. EXECUTIVE SUMMARY 1. INTRODUCTION 2. METABOLISM AND DISPOSITION 2.1 ABSORPTION 2.2 DISTRIBUTION 2.3 METABOLISM 2.4 EXCRETION 3. NONCARCINOGENIC HEALTH EFFECTS 3.1 HUMAN 3.2 ANIMAL 3.3 REFERENCE DOSE 3.4 TARGET ORGANS/CRITICAL EFFECTS 4. CARCINOGENICITY 4.1 HUMAN 4.2 ANIMAL 4.3 EPA WEIGHT-OF-EVIDENCE 4.4 CARCINOGENICITY SLOPE FACTORS 5. REFERENCES December 1994 Prepared by Kowetha A. Davidson, Ph.D., Chemical Hazard Evaluation and Communication Program, Biomedical and Environmental Information Analysis Section, Health Sciences Research Division, *, Oak Ridge, Tennessee.

62

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

CYANIDE CYANIDE NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. February 1994 Prepared by Rosmarie A. Faust, Ph.D., Chemical Hazard Evaluation and Communication Group, Biomedical and Environmental Information Analysis Section, Health and Safety Research Division, *, Oak Ridge, Tennessee. Prepared for OAK RIDGE RESERVATION ENVIRONMENTAL RESTORATION PROGRAM *Managed by Martin Marietta Energy Systems, Inc., for the U.S. Department of Energy under Contract No. DE-AC05-84OR21400 Cyanide most commonly occurs as hydrogen cyanide and its salts--sodium and potassium cyanide. Cyanides are both man-made and naturally occurring

63

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Condensed Toxicity Summary for 1,4-DICHLOROBENZENE Condensed Toxicity Summary for 1,4-DICHLOROBENZENE NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. Prepared by: James C. Norris, Ph.D, Chemical Hazard Evaluation Group in the Biomedical and Environmental Information Analysis Section, Health Sciences Research Division, Oak Ridge National Laboratory*. Prepared for: Oak Ridge Reservation Environmental Restoration Program. *Managed by Martin Marietta Energy Systems, Inc., for the U.S. Department of Energy under Contract No. DE-AC05-84OR21400. 1,4-Dichlorobenzene (CAS 106-46-7), also referred to as para-DCB, p-DCB, paracide, Paramoth®, Parazene®, PDB, and Santochlor®, has a benzene ring

64

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Condensed Toxicity Summary for 2,6-DINITROTOLUENE Condensed Toxicity Summary for 2,6-DINITROTOLUENE NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. Prepared by: Rosmarie A. Faust, Ph.D., Chemical Hazard Evaluation Group in the Biomedical and Environmental Information Analysis Section, Health Sciences Research Division, Oak Ridge National Laboratory*. Prepared for: Oak Ridge Reservation Environmental Restoration Program. *Managed by Martin Marietta Energy Systems, Inc., for the U.S. Department of Energy under Contract No. DE-AC05-84OR21400. 2,6-Dinitrotoluene (2,6-DNT; 2-methyl-1,3-dinitrobenzene; CAS Reg. No. 606-20-2) is a pale yellow crystalline solid and one of six possible

65

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Condensed Toxicity Summary for TETRACHLOROETHYLENE Condensed Toxicity Summary for TETRACHLOROETHYLENE NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. MARCH 1993 Prepared by: Mary Lou Daugherty, M.S., Chemical Hazard Evaluation Group, Biomedical Environmental Information Analysis Section, Health and Safety Research Division, Oak Ridge National Laboratory*, Oak Ridge, Tennessee. Prepared for: Oak Ridge Reservation Environmental Restoration Program. *Managed by Martin Marietta Energy Systems, Inc., for the U.S. Department of Energy under Contract No. DE-AC05-84OR21400. Tetrachloroethylene (CAS No. 127-18-4) is a halogenated aliphatic

66

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Condensed Toxicity Summary for ETHYLBENZENE Condensed Toxicity Summary for ETHYLBENZENE NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. Prepared by: Dennis M. Opresko, Ph.D., Chemical Hazard Evaluation Group in the Biomedical and Environmental Information Analysis Section, Health Sciences Research Division, Oak Ridge National Laboratory*. Prepared for: Oak Ridge Reservation Environmental Restoration Program. *Managed by Martin Marietta Energy Systems, Inc., for the U.S. Department of Energy under Contract No. DE-AC05-84OR21400. Ethylbenzene is a colorless, flammable liquid with a pungent odor (Cavender 1994). The water solubility of ethylbenzene is 0.014 g/100 mL and its vapor

67

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

BENZO[A]PYRENE BENZO[A]PYRENE NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. December 1994 Prepared by: Rosmarie A. Faust, Ph.D., Chemical Hazard Evaluation Group, Biomedical and Environmental Information Analysis Section, Health Sciences Research Division, *, Oak Ridge, Tennessee. Prepared for: OAK RIDGE RESERVATION ENVIRONMENTAL RESTORATION PROGRAM. *Managed by Martin Marietta Energy Systems, Inc., for the U.S. Department of Energy under Contract No. DE-AC05-84OR21400. Benzo[a]pyrene is a polycyclic aromatic hydrocarbon (PAH) that can be derived from coal tar. Benzo[a]pyrene occurs ubiquitously in products of

68

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Condensed Toxicity Summary for AROCLOR-1260 Condensed Toxicity Summary for AROCLOR-1260 NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. Prepared by C. B. Bast, Ph.D., D.A.B.T., Chemical Hazard Evaluation Group, Biomedical and Environmental Information Analysis Section, Health Sciences Research Division, *. Prepared for OAK RIDGE RESERVATION ENVIRONMENTAL RESTORATION PROGRAM *Managed by Martin Marietta Energy Systems, Inc., for the U.S. Department of Energy under Contract No. DE-AC05-84OR21400 Aroclor® 1260 is a polychlorinated biphenyl (PCB) mixture containing approximately 38% C12H4Cl6, 41% C12H3Cl7, 8% C12H2Cl8, and 12% C12H5Cl5

69

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Condensed Toxicity Summary for ZINC AND ZINC COMPOUNDS Condensed Toxicity Summary for ZINC AND ZINC COMPOUNDS NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. April 1992 Prepared by Dennis M. Opresko, Ph.D., Chemical Hazard Evaluation and Communication Group, Biomedical and Environmental Information Analysis Section, Health and Safety Research Division, Oak Ridge National Laboratory*, Oak Ridge, Tennessee Prepared for OAK RIDGE RESERVATION ENVIRONMENTAL RESTORATION PROGRAM *Managed by Martin Marietta Energy Systems, Inc., for the U.S. Department of Energy under Contract No. DE-AC05-84OR21400 Zinc is used primarily in galvanized metals and metal alloys, but zinc

70

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Condensed Toxicity Summary for THALLIUM Condensed Toxicity Summary for THALLIUM NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. DECEMBER 1994 Prepared by: Tim Borges and Mary Lou Daugherty, Chemical Hazard Evaluation Group, Biomedical and Environmental Information Analysis Section, Health Sciences Research Division, Oak Ridge National Laboratory*, Oak Ridge, Tennessee. Prepared for: Oak Ridge Reservation Environmental Restoration Program. *Managed by Martin Marietta Energy Systems, Inc., for the U.S. Department of Energy under Contract No. DE-AC05-84OR21400. This report is an update of the Toxicity Summary for Thallium (CAS Registry

71

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Condensed Toxicity Summary for ASBESTOS Condensed Toxicity Summary for ASBESTOS NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. August 1995 Prepared by: Rosmarie A. Faust, Ph.D., Chemical Hazard Evaluation Group, Biomedical and Environmental Information Analysis Section, Health Sciences Research Division, *, Oak Ridge, Tennessee. Prepared for OAK RIDGE RESERVATION ENVIRONMENTAL RESTORATION PROGRAM. *Managed by Lockheed Martin Energy Systems, Inc., for the U.S. Department of Energy under Contract No. DE-AC05-84OR21400. Asbestos (CAS No. 1332-21-4) is the generic name for a variety of naturally formed hydrated silicates containing metal cations such as sodium,

72

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Condensed Toxicity Summary for METHYL ISOBUTYL KETONE Condensed Toxicity Summary for METHYL ISOBUTYL KETONE NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. July 1995 Prepared by Rosmarie A. Faust, Ph.D., Chemical Hazard Evaluation and Communication Program, Biomedical and Environmental Information Analysis Section, Health Sciences Research Division, *, Oak Ridge, Tennessee. Prepared for OAK RIDGE RESERVATION ENVIRONMENTAL RESTORATION PROGRAM. *Managed by Lockheed Martin Energy Systems, Inc., for the U.S. Department of Energy under Contract No. DE-AC05-84OR21400. Methyl isobutyl ketone (MIBK) (CAS Reg. No. 108-10-1), a clear liquid with

73

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

-DINITROTOLUENE -DINITROTOLUENE NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. Prepared by: Rosmarie A. Faust, Ph.D., Chemical Hazard Evaluation Group in the Biomedical and Environmental Information Analysis Section, Health Sciences Research Division, Oak Ridge National Laboratory*. Prepared for: Oak Ridge Reservation Environmental Restoration Program. *Managed by Martin Marietta Energy Systems, Inc., for the U.S. Department of Energy under Contract No. DE-AC05-84OR21400. This report is an update of the Toxicity Summary for 2,4-Dinitrotoluene (CAS Registry No. 121-14-2). The original summary for this chemical was

74

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

COPPER COPPER NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. EXECUTIVE SUMMARY 1. INTRODUCTION 2. METABOLISM AND DISPOSITION 2.1 ABSORPTION 2.2 DISTRIBUTION 2.3 METABOLISM 2.4 EXCRETION 3. NONCARCINOGENIC HEALTH EFFECTS 3.1 ORAL EXPOSURES 3.2 INHALATION EXPOSURES 3.3 OTHER ROUTES OF EXPOSURE 3.4 TARGET ORGANS/CRITICAL EFFECTS 4. CARCINOGENICITY 4.1 ORAL EXPOSURES 4.2 INHALATION EXPOSURES 4.3 OTHER ROUTES OF EXPOSURE 4.4 EPA WEIGHT-OF-EVIDENCE 4.5 CARCINOGENICITY SLOPE FACTORS 5. REFERENCES DECEMBER 1992 Prepared by: Rosmarie A. Faust, Ph.D., Chemical Hazard Evaluation and Communication Group, Biomedical and Environmental Information Analysis

75

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Formal Toxicity Summary for STRONTIUM-90 Formal Toxicity Summary for STRONTIUM-90 NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. EXECUTIVE SUMMARY 1. INTRODUCTION 2. METABOLISM AND DISPOSITION 3. NONCARCINOGENIC HEALTH EFFECTS 3.1 ORAL EXPOSURES 3.2 INHALATION EXPOSURES 3.3 OTHER ROUTES OF EXPOSURE 3.4 TARGET ORGANS/CRITICAL EFFECTS 4. CARCINOGENICITY 4.1 ORAL EXPOSURES 4.2 INHALATION EXPOSURES 4.3 OTHER ROUTES OF EXPOSURE 4.4 EPA WEIGHT-OF-EVIDENCE 4.5 CARCINOGENICITY SLOPE FACTORS 5. REFERENCES DECEMBER 1994 Prepared by: Sylvia S. Talmage, Ph.D., D.A.B.T., Chemical Hazard Evaluation Group, Biomedical and Environmental Information Analysis Section, Health

76

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Condensed Toxicity Summary for VANADIUM Condensed Toxicity Summary for VANADIUM NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. DECEMBER 1991 Prepared by: Dennis M. Opresko, Ph.D., Chemical Hazard Evaluation and Communication Group Biomedical and Environmental Information Analysis Section, Health and Safety Research Division, *. Oak Ridge, Tennessee Prepared for: Oak Ridge Reservation Environmental Restoration Program. *Managed by Martin Marietta Energy Systems, Inc., for the U.S. Department of Energy under Contract No. DE-AC05-84OR21400. Vanadium is a metallic element that occurs in six oxidation states and

77

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

THALLIUM THALLIUM NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. EXECUTIVE SUMMARY 1. INTRODUCTION 2. METABOLISM AND DISPOSITION 2.1 ABSORPTION 2.2 DISTRIBUTION 2.3 METABOLISM 2.4 EXCRETION 3. NONCARCINOGENIC HEALTH EFFECTS 3.1 ORAL EXPOSURES 3.2 INHALATION EXPOSURES 3.3 OTHER ROUTES OF EXPOSURE 3.4 TARGET ORGANS/CRITICAL EFFECTS 4. CARCINOGENICITY 4.1 ORAL EXPOSURES 4.2 CARCINOGENICITY SLOPE FACTORS 5. REFERENCES DECEMBER 1994 Prepared by: Tim Borges and Mary Lou Daugherty, Chemical Hazard Evaluation Group, Biomedical and Environmental Information Analysis Section, Health Sciences Research Division, Oak Ridge National Laboratory*, Oak Ridge,

78

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Condensed Toxicity Summary for MANGANESE Condensed Toxicity Summary for MANGANESE NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. July 1995 Prepared by A. A. Francis and C. Forsyth, Chemical Hazard Evaluation Group, Biomedical and Environmental Information Analysis Section, Health Sciences Research Division, *, Oak Ridge, Tennessee Prepared for OAK RIDGE RESERVATION ENVIRONMENTAL RESTORATION PROGRAM *Managed by Lockheed Martin Energy Systems, Inc., for the U.S. Department of Energy under Contract No. DE-AC05-84OR21400 Manganese is an essential trace element in humans that can elicit a variety of serious toxic responses upon prolonged exposure to elevated

79

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

2-DICHLOROETHANE 2-DICHLOROETHANE NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. May 1994 Prepared by Dennis M. Opresko, Ph.D., Chemical Hazard Evaluation and Communication Program, Biomedical and Environmental Information Analysis Section, Health Sciences Research Division, *, Oak Ridge, Tennessee. Prepared for OAK RIDGE RESERVATION ENVIRONMENTAL RESTORATION PROGRAM. *Managed by Martin Marietta Energy Systems, Inc., for the U.S. Department of Energy under contract No. DE-AC05-84OR21400. 1,2-Dichloroethane is used primarily in the manufacture of vinyl chloride, as well as in the synthesis of tetrachloroethylene, trichloroethylene,

80

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

COPPER COPPER NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. DECEMBER 1992 Prepared by: Rosmarie A. Faust, Ph.D., Chemical Hazard Evaluation and Communication Group, Biomedical and Environmental Information Analysis Section, Health and Safety Research Division, *, Oak Ridge, Tennessee. Prepared for: Oak Ridge Reservation Environmental Restoration Program. *Managed by Martin Marietta Energy Systems, Inc., for the U.S. Department of Energy under Contract No. DE-AC05-84OR21400. Copper occurs naturally in elemental form and as a component of many minerals. Because of its high electrical and thermal conductivity, it is

Note: This page contains sample records for the topic "information plant assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

TRICHLOROETHENE TRICHLOROETHENE NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. MARCH 1993 Prepared by: Rosmarie A. Faust, Ph.D, Chemical Hazard Evaluation Group, Biomedical Environmental Information Analysis Section, Health and Safety Research Division, *, Oak Ridge, Tennessee Prepared for: Oak Ridge Reservation Environmental Restoration Program. *Managed by Martin Marietta Energy Systems, Inc., for the U.S. Department of Energy under Contract No. DE-AC05-84OR21400. Trichloroethene (TCE) is an industrial solvent used primarily in metal degreasing and cleaning operations. TCE can be absorbed through the lungs,

82

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

HEPTACHLOR HEPTACHLOR NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. EXECUTIVE SUMMARY 1. INTRODUCTION 2. METABOLISM AND DISPOSITION 2.1 ABSORPTION 2.2 DISTRIBUTION 2.3 METABOLISM 2.4 EXCRETION 3. NONCARCINOGENIC HEALTH EFFECTS 3.1 ORAL EXPOSURES 3.2 INHALATION EXPOSURES 3.3 OTHER ROUTES OF EXPOSURE 3.4 TARGET ORGANS/CRITICAL EFFECTS 4. CARCINOGENICITY 4.1 ORAL EXPOSURES 4.2 INHALATION EXPOSURES 4.3 OTHER ROUTES OF EXPOSURE 4.4 EPA WEIGHT-OF-EVIDENCE 4.5 CARCINOGENICITY SLOPE FACTORS 5. REFERENCES The toxicity information included in this summary was researched and compiled by R. A. Faust, Ph.D., who is a member of the Chemical Hazard

83

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

CHLORDANE CHLORDANE NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. December 1994 Prepared by: Carol S. Forsyth, Ph.D., Chemical Hazard Evaluation Group, Biomedical and Environmental Information Analysis Section, Health Sciences Research Division, *, Oak Ridge, Tennessee. Prepared for: OAK RIDGE RESERVATION ENVIRONMENTAL RESTORATION PROGRAM. *Managed by Martin Marietta Energy Systems Inc., for the U.S. Department of Energy under Contract No. DE-AC05-84OR21400. Technical grade chlordane is a mixture of structurally related compounds including trans-chlordane, cis-chlordane, -chlordene, heptachlor, and

84

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Condensed Toxicity Summary for METHYL MERCURY Condensed Toxicity Summary for METHYL MERCURY NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. FEBRUARY, 1992 Prepared by: Robert A. Young, Ph.D., D.A.B.T., Chemical Hazard Evaluation and Communication Group Biomedical and Environmental Information Analysis Section, Health and Safety Research Division, *, Oak Ridge, Tennessee. Prepared for: Oak Ridge Reservation Environmental Restoration Program. *Managed by Martin Marietta Energy Systems, Inc., for the U.S. Department of Energy under Contract No. DE-AC05-84OR21400. Methyl mercury is formed by biotic and abiotic methylation of mercury

85

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

CYANIDE CYANIDE NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. EXECUTIVE SUMMARY 1. INTRODUCTION 2. METABOLISM AND DISPOSITION 2.1 ABSORPTION 2.2 DISTRIBUTION 2.3 METABOLISM 2.4 EXCRETION 3. NONCARCINOGENIC HEALTH EFFECTS 3.1 ORAL EXPOSURES 3.2 INHALATION EXPOSURES 3.3 OTHER ROUTES OF EXPOSURE 3.4 TARGET ORGANS/CRITICAL EFFECTS 4. CARCINOGENICITY 4.1 ORAL EXPOSURES 4.2 INHALATION EXPOSURES 4.3 OTHER ROUTES OF EXPOSURE 4.4 EPA WEIGHT-OF-EVIDENCE 4.5 CARCINOGENICITY SLOPE FACTORS 5. REFERENCES February 1994 Prepared by Rosmarie A. Faust, Ph.D., Chemical Hazard Evaluation and Communication Group, Biomedical and Environmental Information Analysis

86

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

FLUORANTHENE FLUORANTHENE NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. August 1993 Prepared by Rosmarie A. Faust, Ph.D., Chemical Hazard Evaluation and Communication Program, Biomedical and Environmental Information Analysis Section, Health Sciences Research Division, *, Oak Ridge, Tennessee. Prepared for OAK RIDGE RESERVATION ENVIRONMENTAL RESTORATION PROGRAM. *Managed by Martin Marietta Energy Systems, Inc., for the U.S. Department of Energy under contract No. DE-AC05-84OR21400. Fluoranthene is a polycyclic aromatic hydrocarbon (PAH) that can be derived from coal tar. Occurring ubiquitously in products of incomplete combustion

87

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Condensed Toxicity Summary for BENZENE Condensed Toxicity Summary for BENZENE NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. September 1992 Prepared by: Mary Lou Daugherty, M.S., Chemical Hazard Evaluation and Communication Group, Biomedical and Environmental Information Analysis Section, Health and Safety Research Division*, , Oak Ridge, Tennessee. Prepared for OAK RIDGE RESERVATION ENVIRONMENTAL RESTORATION PROGRAM. *Managed by Martin Marietta Energy Systems, Inc., for the U.S. Department of Energy under Contract No. DE-AC05-84OR21400. Benzene is absorbed via ingestion, inhalation, and skin application.

88

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Prepared by C. B. Bast, Ph.D., D.A.B.T., Chemical Hazard Evaluation Group, Prepared by C. B. Bast, Ph.D., D.A.B.T., Chemical Hazard Evaluation Group, Biomedical and Environmental Information Analysis Section, Health Sciences Research Division, *. Prepared for OAK RIDGE RESERVATION ENVIRONMENTAL RESTORATION PROGRAM *Managed by Martin Marietta Energy Systems, Inc., for the U.S. Department of Energy under Contract No. DE-AC05-84OR21400 Aroclor® 1254 is a polychlorinated biphenyl (PCB) mixture containing approximately 21% C12H6Cl4, 48% C12H5Cl5, 23% C12H4Cl6, and 6% C12H3Cl7 with an average chlorine content of 54% (USAF 1989). PCBs are inert, thermally and physically stable, and have dielectric properties. In the environment, the behavior of PCB mixtures is directly correlated to the degree of chlorination. Aroclor® is strongly sorbed to soil and remains

89

PRIVACY IMPACT ASSESSMENT: Human Resources Personal Information  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Human Human Resources - Personal Information Change Request PIA Template Version 3 - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetext/neword/206/o2061.pdf Please complete electronically: no hand-written submissions will be accepted. This template may not be modified. MODULE 1- PRIVACY NEEDS ASSESSMENT Date Departmental Element & Site Idaho National Engineering Laboratory Engineering Research Office Building (EROB) Name of Information Human Resources - Personal Information Change Request System or IT Project Business Enclave Exhibit Project UID 106800 NewPIA ~ Update D N T 'tl I Contact Information arne,

90

Risk Informed Assessment of Regulatory and Design Requirements for Future Nuclear Power Plants (Cooperative Agreement DE-FC03-99SF21902, Am. M004) Final Technical Report  

SciTech Connect

OAK-B135 Research under this project addresses the barriers to long term use of nuclear-generated electricity in the United States. It was agreed that a very basic and significant change to the current method of design and regulation was needed. That is, it was believed that the cost reduction goal could not be met by fixing the current system (i.e., an evolutionary approach) and a new, more advanced approach for this project would be needed. It is believed that a completely new design and regulatory process would have to be developed--a ''clean sheet of paper'' approach. This new approach would start with risk-based methods, would establish probabilistic design criteria, and would implement defense-in-depth only when necessary (1) to meet public policy issues (e.g., use of a containment building no matter how low the probability of a large release is) and (2) to address uncertainties in probabilistic methods and equipment performance. This new approach is significantly different from the Nuclear Regulatory Commission's (NRC) current risk-informed program for operating plants. For our new approach, risk-based methods are the primary means for assuring plant safety, whereas in the NRC's current approach, defense-in-depth remains the primary means of assuring safety. The primary accomplishments in the first year--Phase 1 were (1) the establishment of a new, highly risk-informed design and regulatory framework, (2) the establishment of the preliminary version of the new, highly risk-informed design process, (3) core damage frequency predictions showing that, based on new, lower pipe rupture probabilities, the design of the emergency core cooling system equipment can be simplified without reducing plant safety, and (4) the initial development of methods for including uncertainties in a new integrated structures-systems design model. Under the new regulatory framework, options for the use of ''design basis accidents'' were evaluated. It is expected that design basis accidents would be an inherent part of the Probabilistic Safety Assessment for the plant and their evaluation would be probabilistic. Other first year accomplishments include (1) the conversion of an NRC database for cross-referencing NRC criteria and industry codes and standards to Microsoft 2000 software, (2) an assessment of the NRC's hearing process which concluded that the normal cross-examination during public hearings is not actually required by the U.S. Administrative Procedures Act, (3) the identification and listing of reliability data sources, and (4) interfacing with other industry groups (e.g., NEI and IAEA) and NRC at workshops for risk-informing regulations. The major accomplishments during the second year consisted of (1) issuance of the final report for Subtask 1.1, ''Identify Current Applicable Regulatory Requirements [and Industry Standards],'' (2) issuance of the final report for Subtask 1.2,'' Identify Structures, Systems, and Components and Their Associate d Costs for a Typical Plant,'' (3) extension of the new, highly risk-informed design and regulatory framework to non-light-water-reactor technology, (4) completion of more detailed thermal-hydraulic and probabilistic analyses of advanced conceptual reactor system/component designs, (6) initial evaluation and recommendations for improvement of the NRC design review process, and (7) initial development of the software format, procedures and statistical routines needed to store, analyze and retrieve the available reliability data. Final reports for Subtasks 1.1 (regulatory and design criteria) and 1.2 (costs for structures, systems, and components) were prepared and issued. A final report for Subtask 1.3 (Regulatory Framework) was drafted with the aim to issue it in Phase 3 (Year 3). One technical report was produced for Subtask 1.4 (methods development) and two technical reports were produced for Subtask 1.6 (sample problem analysis). An interim report on the NRC design review process (Subtask 1.7) was prepared and issued. Finally, a report on Subtask 2.2 (database weaknesses) addressed the i

Stanley E. Ritterbusch, et. al.

2003-01-29T23:59:59.000Z

91

National Climate Assessment: Draft Report Information  

NLE Websites -- All DOE Office Websites (Extended Search)

Draft Report Information Print E-mail Draft Report Information Print E-mail Below you will find information about the draft of the Third National Climate Assessment Report. Although the public comment period is now closed, the draft report is still available for download at http://ncadac.globalchange.gov. Click here to view/print a two-page fact sheet about the National Climate Assessment. NCA facsheet What is the National Climate Assessment (NCA)? What are the objectives of the NCA? What is new about the Third NCA? Who is responsible for the NCA? How do I comment on the draft NCA report? What topics are covered in the Third NCA Report? Next steps Expected outcomes and benefits How can I get involved in the NCA? What is the National Climate Assessment (NCA)? The NCA is an important resource for understanding and communicating climate change science and impacts in the United States. It informs the nation about already observed changes, the current status of the climate, and anticipated trends for the future. The NCA report process integrates scientific information from multiple sources and sectors to highlight key findings and significant gaps in our knowledge. The NCA also establishes consistent methods for evaluating climate impacts in the U.S. in the context of broader global change. Finally, findings from the NCA provide input to Federal science priorities and are used by U.S. citizens, communities, and businesses as they create more sustainable and environmentally sound plans for the nation's future.

92

Qing an Cogeneration Plant | Open Energy Information  

Open Energy Info (EERE)

Qing an Cogeneration Plant Jump to: navigation, search Name Qing'an Cogeneration Plant Place Heilongjiang Province, China Zip 152400 Sector Biomass Product China-based biomass...

93

Assessment of Existing Plant Instrumentation for Severe Accident Management  

Science Conference Proceedings (OSTI)

During an accident, information would be needed for diagnosing a plant's status and confirming its response to mitigative actions. It is important to determine the information necessary for severe accident management and to ensure that this information could be derived from plant instrumentation.

1993-12-01T23:59:59.000Z

94

Literature Review and Assessment of Plant and Animal Transfer Factors Used in Performance Assessment Modeling  

Science Conference Proceedings (OSTI)

A literature review and assessment was conducted by Pacific Northwest National Laboratory (PNNL) to update information on plant and animal radionuclide transfer factors used in performance-assessment modeling. A group of 15 radionuclides was included in this review and assessment. The review is composed of four main sections, not including the Introduction. Section 2.0 provides a review of the critically important issue of physicochemical speciation and geochemistry of the radionuclides in natural soil-water systems as it relates to the bioavailability of the radionuclides. Section 3.0 provides an updated review of the parameters of importance in the uptake of radionuclides by plants, including root uptake via the soil-groundwater system and foliar uptake due to overhead irrigation. Section 3.0 also provides a compilation of concentration ratios (CRs) for soil-to-plant uptake for the 15 selected radionuclides. Section 4.0 provides an updated review on radionuclide uptake data for animal products related to absorption, homeostatic control, approach to equilibration, chemical and physical form, diet, and age. Compiled transfer coefficients are provided for cows milk, sheeps milk, goats milk, beef, goat meat, pork, poultry, and eggs. Section 5.0 discusses the use of transfer coefficients in soil, plant, and animal modeling using regulatory models for evaluating radioactive waste disposal or decommissioned sites. Each section makes specific suggestions for future research in its area.

Robertson, David E.; Cataldo, Dominic A.; Napier, Bruce A.; Krupka, Kenneth M.; Sasser, Lyle B.

2003-07-20T23:59:59.000Z

95

Saguargo Solar Power Plant Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Saguargo Solar Power Plant Solar Power Plant Saguargo Solar Power Plant Solar Power Plant Jump to: navigation, search Name Saguargo Solar Power Plant Solar Power Plant Facility Saguargo Solar Power Plant Sector Solar Facility Type Concentrating Solar Power Facility Status In Service Developer Solargenix Location Red Rock, Arizona Coordinates 32.54795°, -111.292887° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.54795,"lon":-111.292887,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

96

Deming Solar Plant Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Deming Solar Plant Solar Power Plant Deming Solar Plant Solar Power Plant Jump to: navigation, search Name Deming Solar Plant Solar Power Plant Facility Deming Solar Plant Sector Solar Facility Type Photovoltaic Developer New Solar Ventures/ Solar Torx 50/50 Location New Mexico Coordinates 34.9727305°, -105.0323635° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.9727305,"lon":-105.0323635,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

97

Prescott Airport Solar Plant Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Prescott Airport Solar Plant Solar Power Plant Prescott Airport Solar Plant Solar Power Plant Jump to: navigation, search Name Prescott Airport Solar Plant Solar Power Plant Facility Prescott Airport Solar Plant Sector Solar Facility Type Photovoltaic Developer APS Location Prescott, Arizona Coordinates 34.5400242°, -112.4685025° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.5400242,"lon":-112.4685025,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

98

Solana Generating Plant Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Plant Solar Power Plant Plant Solar Power Plant Jump to: navigation, search Name Solana Generating Plant Solar Power Plant Facility Solana Generating Plant Sector Solar Facility Type Concentrating Solar Power Facility Status Under Construction Developer Abengoa Solar Location Gila Bend, Arizona Coordinates 32.916163°, -112.968727° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.916163,"lon":-112.968727,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

99

Validation of seismic probabilistic risk assessments of nuclear power plants  

SciTech Connect

A seismic probabilistic risk assessment (PRA) of a nuclear plant requires identification and information regarding the seismic hazard at the plant site, dominant accident sequences leading to core damage, and structure and equipment fragilities. Uncertainties are associated with each of these ingredients of a PRA. Sources of uncertainty due to seismic hazard and assumptions underlying the component fragility modeling may be significant contributors to uncertainty in estimates of core damage probability. Design and construction errors also may be important in some instances. When these uncertainties are propagated through the PRA, the frequency distribution of core damage probability may span three orders of magnitude or more. This large variability brings into question the credibility of PRA methods and the usefulness of insights to be gained from a PRA. The sensitivity of accident sequence probabilities and high-confidence, low probability of failure (HCLPF) plant fragilities to seismic hazard and fragility modeling assumptions was examined for three nuclear power plants. Mean accident sequence probabilities were found to be relatively insensitive (by a factor of two or less) to: uncertainty in the coefficient of variation (logarithmic standard deviation) describing inherent randomness in component fragility; truncation of lower tail of fragility; uncertainty in random (non-seismic) equipment failures (e.g., diesel generators); correlation between component capacities; and functional form of fragility family. On the other hand, the accident sequence probabilities, expressed in the form of a frequency distribution, are affected significantly by the seismic hazard modeling, including slopes of seismic hazard curves and likelihoods assigned to those curves.

Ellingwood, B. [Johns Hopkins Univ., Baltimore, MD (United States). Dept. of Civil Engineering

1994-01-01T23:59:59.000Z

100

Worldwide assessment of steam-generator problems in pressurized-water-reactor nuclear power plants  

Science Conference Proceedings (OSTI)

Objective is to assess the reliability of steam generators of pressurized water reactor (PWR) power plants in the United States and abroad. The assessment is based on operation experience of both domestic and foreign PWR plants. The approach taken is to collect and review papers and reports available from the literature as well as information obtained by contacting research institutes both here and abroad. This report presents the results of the assessment. It contains a general background of PWR plant operations, plant types, and materials used in PWR plants. A review of the worldwide distribution of PWR plants is also given. The report describes in detail the degradation problems discovered in PWR steam generators: their causes, their impacts on the performance of steam generators, and the actions to mitigate and avoid them. One chapter is devoted to operating experience of PWR steam generators in foreign countries. Another discusses the improvements in future steam generator design.

Woo, H.H.; Lu, S.C.

1981-09-15T23:59:59.000Z

Note: This page contains sample records for the topic "information plant assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Geothermal Steam Power Plant | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home General List of Dry Steam Plants List of Flash Steam Plants Steam Power Plants Dry Steam Power Plants Simple Dry Steam Powerplant process description - DOE EERE 2012 Dry steam plants use hydrothermal fluids that are primarily steam. The steam travels directly to a turbine, which drives a generator that produces electricity. The steam eliminates the need to burn fossil fuels to run the turbine (also eliminating the need to transport and store fuels). These plants emit only excess steam and very minor amounts of gases.[1] Dry steam power plants systems were the first type of geothermal power generation plants built (they were first used at Lardarello in Italy in 1904). Steam technology is still effective today at currently in use at The

102

Geothermal/Power Plant | Open Energy Information  

Open Energy Info (EERE)

Geothermal/Power Plant Geothermal/Power Plant < Geothermal(Redirected from Power Plant) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Land Use Leasing Exploration Well Field Power Plant Transmission Environment Water Use Print PDF Geothermal Power Plants General List of Plants Map of Plants Regulatory Roadmap NEPA (19) Binary power system equipment and cooling towers at the ORMAT Ormesa Geothermal Power Complex in Southern California. Geothermal Power Plants discussion Electricity Generation Converting the energy from a geothermal resource into electricity is achieved by producing steam from the heat underground to spin a turbine which is connected to a generator to produce electricity. The type of energy conversion technology that is used depends on whether the resource is predominantly water or steam, the temperature of the resource, and the

103

Flash Steam Power Plant | Open Energy Information  

Open Energy Info (EERE)

Flash Steam Power Plant Flash Steam Power Plant (Redirected from Flash Steam Power Plants) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Flash Steam Power Plants General List of Flash Steam Plants Flash Steam power plant process diagram - DOE EERE 2012 Flash steam plants are the most common type of geothermal power generation plants in operation in the world today. Fluid at temperatures greater than 360°F (182°C) is pumped under high pressure into a tank at the surface held at a much lower pressure, causing some of the fluid to rapidly vaporize, or "flash." The vapor then drives a turbine, which drives a generator. If any liquid remains in the tank, it can be flashed again in a second tank to extract even more energy.[1] Facility Name Owner Capacity (MW) Facility

104

Geothermal Steam Power Plant | Open Energy Information  

Open Energy Info (EERE)

(Redirected from Dry Steam) (Redirected from Dry Steam) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home General List of Dry Steam Plants List of Flash Steam Plants Steam Power Plants Dry Steam Power Plants Simple Dry Steam Powerplant process description - DOE EERE 2012 Dry steam plants use hydrothermal fluids that are primarily steam. The steam travels directly to a turbine, which drives a generator that produces electricity. The steam eliminates the need to burn fossil fuels to run the turbine (also eliminating the need to transport and store fuels). These plants emit only excess steam and very minor amounts of gases.[1] Dry steam power plants systems were the first type of geothermal power generation plants built (they were first used at Lardarello in Italy in 1904). Steam technology is still effective today at currently in use at The

105

Energeticals power plant engineering | Open Energy Information  

Open Energy Info (EERE)

Energeticals power plant engineering Energeticals power plant engineering Jump to: navigation, search Name energeticals power plant engineering Place München, Bavaria, Germany Zip 81371 Sector Biomass, Geothermal energy Product Planning, design, installation and operation of turnkey plants for heat and electricity generation in the field of solid Biomass, deep and shallow geothermal energy and water power. References energeticals power plant engineering[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. energeticals power plant engineering is a company located in München, Bavaria, Germany . References ↑ "[ energeticals power plant engineering]" Retrieved from "http://en.openei.org/w/index.php?title=Energeticals_power_plant_engineering&oldid=344770

106

Nuclear power plant performance assessment pertaining to plant aging in France and the United States  

E-Print Network (OSTI)

The effect of aging on nuclear power plant performance has come under increased scrutiny in recent years. The approaches used to make an assessment of this effect strongly influence the economics of nuclear power plant ...

Guyer, Brittany (Brittany Leigh)

2013-01-01T23:59:59.000Z

107

Flash Steam Power Plant | Open Energy Information  

Open Energy Info (EERE)

Flash Steam Power Plant Flash Steam Power Plant Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Flash Steam Power Plants General List of Flash Steam Plants Flash Steam power plant process diagram - DOE EERE 2012 Flash steam plants are the most common type of geothermal power generation plants in operation in the world today. Fluid at temperatures greater than 360°F (182°C) is pumped under high pressure into a tank at the surface held at a much lower pressure, causing some of the fluid to rapidly vaporize, or "flash." The vapor then drives a turbine, which drives a generator. If any liquid remains in the tank, it can be flashed again in a second tank to extract even more energy.[1] Facility Name Owner Capacity (MW) Facility Type Commercial Online Date Geothermal Area

108

Binary Cycle Power Plant | Open Energy Information  

Open Energy Info (EERE)

Binary Cycle Power Plant Binary Cycle Power Plant (Redirected from Binary Cycle Power Plants) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Binary Cycle Power Plant General List of Binary Plants Binary power plant process diagram - DOE EERE 2012 Binary cycle geothermal power generation plants differ from Dry Steam and Flash Steam systems in that the water or steam from the geothermal reservoir never comes in contact with the turbine/generator units. Low to moderately heated (below 400°F) geothermal fluid and a secondary (hence, "binary") fluid with a much lower boiling point that water pass through a heat exchanger. Heat from the geothermal fluid causes the secondary fluid to flash to vapor, which then drives the turbines and subsequently, the generators.

109

Binary Cycle Power Plant | Open Energy Information  

Open Energy Info (EERE)

Binary Cycle Power Plant Binary Cycle Power Plant (Redirected from Binary) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Binary Cycle Power Plant General List of Binary Plants Binary power plant process diagram - DOE EERE 2012 Binary cycle geothermal power generation plants differ from Dry Steam and Flash Steam systems in that the water or steam from the geothermal reservoir never comes in contact with the turbine/generator units. Low to moderately heated (below 400°F) geothermal fluid and a secondary (hence, "binary") fluid with a much lower boiling point that water pass through a heat exchanger. Heat from the geothermal fluid causes the secondary fluid to flash to vapor, which then drives the turbines and subsequently, the generators. Binary cycle power plants are closed-loop systems and virtually nothing

110

Geothermal/Power Plant | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Geothermal/Power Plant < Geothermal Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Land Use Leasing Exploration Well Field Power Plant Transmission Environment Water Use Print PDF Geothermal Power Plants General List of Plants Map of Plants Regulatory Roadmap NEPA (20) Binary power system equipment and cooling towers at the ORMAT Ormesa Geothermal Power Complex in Southern California. Geothermal Power Plants discussion Electricity Generation Converting the energy from a geothermal resource into electricity is achieved by producing steam from the heat underground to spin a turbine

111

Plant-Wide Assessment Report for Shaw Industries, Plant #78; Aiken, SC  

Science Conference Proceedings (OSTI)

A plant-wide energy assessment sponsored by the U.S. Department of Energy was conducted at Shaw Industries Group, plant #78 in Aiken, SC. The assessment team consisted of Georgia Tech faculty from the Energy & Environmental Management Center and Shaw personnel from plant #78 and the corporate energy group. The purpose of this assessment was to uncover as many opportunities for saving energy usage and costs using techniques that have been established as best practices in the energy engineering field. In addition, these findings are to be shared with similar plants in Shaw Industries Group to multiply the lessons learned. The findings from this assessment are included in this report.

Michael Brown PE, CEM; Matt Soderlund; Bill Meffert PE; Paolo Baldisserotto; Jerry Zolkowski PE, CEM

2006-04-10T23:59:59.000Z

112

POWER PLANT OPERATIONS REPORT - Energy Information Administration  

U.S. Energy Information Administration (EIA)

This schedule must be completed by plants with a total steam turbine capacity of 10 megawatts and abovethat burn organic fuels. Report only fuels consumed in the ...

113

Cemex River Plant | Open Energy Information  

Open Energy Info (EERE)

Plant Plant Jump to: navigation, search Name Cemex River Plant Facility Cemex River Plant Sector Wind energy Facility Type Community Wind Facility Status In Service Owner Foundation Windpower Developer Foundation Windpower Energy Purchaser Cemex River Plant Location Victorville CA Coordinates 34.55527517°, -117.3012614° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.55527517,"lon":-117.3012614,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

114

Binary Cycle Power Plant | Open Energy Information  

Open Energy Info (EERE)

GEOTHERMAL ENERGYGeothermal Home GEOTHERMAL ENERGYGeothermal Home Binary Cycle Power Plant General List of Binary Plants Binary power plant process diagram - DOE EERE 2012 Binary cycle geothermal power generation plants differ from Dry Steam and Flash Steam systems in that the water or steam from the geothermal reservoir never comes in contact with the turbine/generator units. Low to moderately heated (below 400°F) geothermal fluid and a secondary (hence, "binary") fluid with a much lower boiling point that water pass through a heat exchanger. Heat from the geothermal fluid causes the secondary fluid to flash to vapor, which then drives the turbines and subsequently, the generators. Binary cycle power plants are closed-loop systems and virtually nothing (except water vapor) is emitted to the atmosphere. Resources below 400°F

115

Pantex Plant Wind Project | Open Energy Information  

Open Energy Info (EERE)

Pantex Plant Wind Project Pantex Plant Wind Project Jump to: navigation, search Name Pantex Plant Wind Project Facility Pantex Plant Wind Project Sector Wind energy Facility Type Commercial Scale Wind Facility Status Under Construction Owner Pantex Developer Siemens Energy Purchaser Pantex Plant Location Amarillo TX Coordinates 35.307841°, -101.535301° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.307841,"lon":-101.535301,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

116

Functional Specification: Operations and Maintenance Excellence PlantView Risk Assessment Module Modifications  

Science Conference Proceedings (OSTI)

This report specifies changes to the Risk module of the PlantView software as part of the Electric Power Research Institute's (EPRI's) Operations and Maintenance Excellence (OMX) initiative. The proposed concept for a risk-informed fossil plant maintenance module builds on previous EPRI research and development that has produced applications such as REaP, LP Rim Life, Turbo-X, Boiler-OIO, and the PlantView Risk Assessment module. Risk assessment will then be more effectively integrated with other key pro...

2010-07-28T23:59:59.000Z

117

Kawasaki Plant Systems Ltd | Open Energy Information  

Open Energy Info (EERE)

Kawasaki Plant Systems Ltd Kawasaki Plant Systems Ltd Jump to: navigation, search Name Kawasaki Plant Systems Ltd Place Kobe, Japan Zip 650-8670 Sector Biomass, Services, Solar Product Engineers, manufactures, and provide maintenance services for biomass, fuel cell, and solar power plants. Coordinates 39.134838°, -106.309379° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.134838,"lon":-106.309379,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

118

Hull Municipal Light Plant | Open Energy Information  

Open Energy Info (EERE)

Municipal Light Plant Municipal Light Plant Jump to: navigation, search Name Hull Municipal Light Plant Place Massachusetts Utility Id 8797 Utility Location Yes Ownership M NERC Location NPCC NERC NPCC Yes Operates Generating Plant Yes Activity Generation Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Area Lights Rate 150 WATT Lighting Area Lights Rate 250 WATT Lighting Area Lights Rate 400 WATT Lighting Large Power Rate 35 Industrial Large Power Taxable Rate 39 Industrial Municipal Lighting Rate 33 Lighting Municipal Rate 36 Commercial Residential Rate 31 Residential

119

SC Johnson Waxdale Plant | Open Energy Information  

Open Energy Info (EERE)

SC Johnson Waxdale Plant SC Johnson Waxdale Plant Jump to: navigation, search Name SC Johnson Waxdale Plant Facility SC Johnson Waxdale Plant Sector Wind energy Facility Type Community Wind Facility Status In Service Owner SC Johnson Developer SC Johnson Energy Purchaser SC Johnson Location Sturtevant WI Coordinates 42.71313982°, -87.88755655° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.71313982,"lon":-87.88755655,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

120

Bieber Plant Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Bieber Plant Biomass Facility Bieber Plant Biomass Facility Jump to: navigation, search Name Bieber Plant Biomass Facility Facility Bieber Plant Sector Biomass Location Bieber, California Coordinates 41.1212775°, -121.1441396° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.1212775,"lon":-121.1441396,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "information plant assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Brawley Power Plant Abandoned | Open Energy Information  

Open Energy Info (EERE)

Abandoned Abandoned Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article: Brawley Power Plant Abandoned Abstract N/A Authors California Division of Oil, Gas and and Geothermal Resources Published Journal Geothermal Hot Line, 1985 DOI Not Provided Check for DOI availability: http://crossref.org Online Internet link for Brawley Power Plant Abandoned Citation California Division of Oil, Gas, and Geothermal Resources. 1985. Brawley Power Plant Abandoned. Geothermal Hot Line. 15(2):76-77. Retrieved from "http://en.openei.org/w/index.php?title=Brawley_Power_Plant_Abandoned&oldid=682727" Categories: References Uncited References Geothermal References What links here Related changes Special pages Printable version Permanent link Browse properties

122

Blythe Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Blythe Solar Power Plant Blythe Solar Power Plant Jump to: navigation, search Name Blythe Solar Power Plant Facility Blythe Sector Solar Facility Type Photovoltaic Developer First Solar Location Blythe, California Coordinates 33.6172329°, -114.5891744° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.6172329,"lon":-114.5891744,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

123

Stateline Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Stateline Solar Power Plant Stateline Solar Power Plant Jump to: navigation, search Name Stateline Solar Power Plant Facility Stateline Sector Solar Facility Type Photovoltaic Developer First Solar Location San Bernardino County, California Coordinates 34.9592083°, -116.419389° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.9592083,"lon":-116.419389,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

124

Final Environmental Assessment for the Y-12 Steam Plant Life Extenstion Project - Steam Plant Replacement Subproject  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

93 93 Final Environmental Assessment for the Y-12 Steam Plant Life Extension Project - Steam Plant Replacement Subproject U.S. Department of Energy National Nuclear Security Administration August 2007 Final Y-12 Steam Plant Life Extension Project - Steam Plant Replacement Subproject - August 2007 i TABLE OF CONTENTS List of Acronyms and Abbreviations............................................................................................. vi Chemicals and Units of Measure ................................................................................................. ix Conversion Chart ......................................................................................................................... xi Metric Prefixes .............................................................................................................................xii

125

Independent Oversight Assessment, Waste Treatment and Immobilization Plant  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Treatment and Waste Treatment and Immobilization Plant - January 2012 Independent Oversight Assessment, Waste Treatment and Immobilization Plant - January 2012 January 2012 Assessment of the Nuclear Safety Culture and Management of Nuclear Safety Concerns at the Hanford Site Waste Treatment and Immobilization Plant The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent assessment at the DOE Waste Treatment and Immobilization Plant (WTP) to evaluate the current status of the nuclear safety culture and the effectiveness of DOE and contractor management in addressing nuclear safety concerns at WTP. This assessment provides DOE management with a follow-up on the October 2010 HSS review of the WTP

126

Life-cycle assessment of wastewater treatment plants  

E-Print Network (OSTI)

This thesis presents a general model for the carbon footprints analysis of wastewater treatment plants (WWTPs), using a life cycle assessment (LCA) approach. In previous research, the issue of global warming is often related ...

Dong, Bo, M. Eng. Massachusetts Institute of Technology

2012-01-01T23:59:59.000Z

127

Comparison of data models for plant lifecycle information management  

Science Conference Proceedings (OSTI)

Several data models have been defined for enabling information interoperability during the process plant life cycle. The data models differ in details and their scopes are different, making it difficult to compare and evaluate them. While the importance ... Keywords: Aex, Ifc, Interoperability, Iso 15926, Plant Modeling, Step

Pekka Siltanen; Antti Prnnen

2006-05-01T23:59:59.000Z

128

Risk-Informed Process Hierarchy for Fossil Plant Maintenance Application  

Science Conference Proceedings (OSTI)

This report describes the functions, capabilities, and features of risk-informed maintenance processes for fossil power plants. This research is the basis on which to develop a software module in an enterprise asset management system (EAMS). Some power plants already use one of the processes described in this report. Additional capabilities are described to enhance that process. New processes are described that address additional applications for risk-informed maintenance.

2008-12-23T23:59:59.000Z

129

Tools for Assessing Building Energy Use in Industrial Plants  

E-Print Network (OSTI)

This presentation will cover a brief history of building energy measures savings potential for industrial plants and briefly characterize building energy measures and their savings identified over approximately the past 15 years in energy audits. The nature and extent of building energy assessment tools will then be profiled, and the beneficial use of an appropriate subset of these tools for assessing energy savings in buildings at industrial plants will be described. Possible future tools that may be useful will also be mentioned.

Martin, M.; MacDonald, M.

2007-01-01T23:59:59.000Z

130

Mohave Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Mohave Solar Power Plant Mohave Solar Power Plant Facility Mojave Solar Sector Solar Facility Type Concentrating Solar Power Facility Status Under Construction Owner Mojave Solar LLC, Developer Abengoa Solar, Mohave Sun LLC Location Mohave County, Arizona Coordinates 35.017264°, -117.316607° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.017264,"lon":-117.316607,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

131

Neal Hot Springs Geothermal Power Plant | Open Energy Information  

Open Energy Info (EERE)

Neal Hot Springs Geothermal Power Plant Neal Hot Springs Geothermal Power Plant Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Neal Hot Springs Geothermal Power Plant General Information Name Neal Hot Springs Geothermal Power Plant Facility Neal Hot Springs Sector Geothermal energy Location Information Location Malheur County, Oregon Coordinates 44.02239°, -117.4631° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.02239,"lon":-117.4631,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

132

North Brawley Geothermal Power Plant | Open Energy Information  

Open Energy Info (EERE)

Brawley Geothermal Power Plant Brawley Geothermal Power Plant Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home North Brawley Geothermal Power Plant General Information Name North Brawley Geothermal Power Plant Facility North Brawley Sector Geothermal energy Location Information Location Imperial Valley, California Coordinates 33.015046°, -115.542267° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.015046,"lon":-115.542267,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

133

Digital control systems in nuclear power plants: Failure information, modeling concepts, and applications. Revision 1  

SciTech Connect

This report briefly describes some current applications of advanced computerized digital display and control systems at US commercial nuclear power plants and presents the results of a literature search that was made to gather information on the reliability of these systems. Both hardware and software reliability were addressed in this review. Only limited failure rate information was found, with the chemical process industry being the primary source of information on hardware failure rates and expert opinion the primary source for software failure rates. Safety-grade digital control systems are typically installed on a functional like-for-like basis, replacing older analog systems without substantially changing interactions with other plant systems. Future work includes performing a limited probabilistic risk assessment of a representative DCS to assess its risk significance.

Galyean, W.J.

1993-06-23T23:59:59.000Z

134

Approach to Assessing Fuel Flexibility for Improved Generating Plant Profitability  

Science Conference Proceedings (OSTI)

This report presents the results of an EPRI study of fuel flexibility, a strategy that can increase a power plant's financial performance by matching choices regarding the type of coal burned at a generating station to fluctuations in the market price of electricity. The report presents detailed analytical information as well as conclusions drawn from the study, and includes a checklist utilities can use in evaluating the potential for a plant to benefit by adopting fuel flexibility.

1999-08-24T23:59:59.000Z

135

Assessing Plant Performance for Energy Savings | ENERGY STAR Buildings &  

NLE Websites -- All DOE Office Websites (Extended Search)

Assessing Plant Performance for Energy Savings Assessing Plant Performance for Energy Savings Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition Research and reports Service and product provider (SPP) resources Success stories

136

Guideline for Assessing Maintenance Effectiveness: A Self-Assessment Guideline for Nuclear Power Plants  

Science Conference Proceedings (OSTI)

The EPRI Technologies for Equipment Assessment and Maintenance (TEAM) group has prepared this guideline to assist EPRI-member nuclear power plants in further improving their maintenance processes by presenting, in detail, a collection of the key elements and activities that contribute to a well-organized maintenance program. An honest assessment of these activities then provides tools that can be used to perform a self-assessment of an existing maintenance program. This assessment is directed toward how ...

2002-12-10T23:59:59.000Z

137

Plant-Wide Energy Efficiency Assessment at the Arizona Portland Cement Plant in Rillito, Arizona  

SciTech Connect

A Department of Energy Plant-wide Assessment was undertaken by Arizona Portland Cement (APC) beginning in May 2005. The assessment was performed at APCs cement production facility in Rillito, Arizona. The assessment included a compressed air evaluation along with a detailed process audit of plant operations and equipment. The purpose of this Energy Survey was to identify a series of energy cost savings opportunities at the Plant, and provide preliminary cost and savings estimates for the work. The assessment was successful in identifying projects that could provide annual savings of over $2.7 million at an estimated capital cost of $4.3 million. If implemented, these projects could amount to a savings of over 4.9 million kWh/yr and 384,420 MMBtu/year.

Stephen J. Coppinger, P.E.; Bruce Colburn, Ph.D., P.E., CEM

2007-05-17T23:59:59.000Z

138

Martinez Refinery Completes Plant-Wide Energy Assessment  

SciTech Connect

This OIT BestPractices Case Study describes how the Equilon Enterprises oil refinery in Martinez, California undertook a plant-wide energy assessment that focused on three key areas: waste minimization, process debottlenecking, and operations optimization. The assessment yielded recommendations, which, if implemented, can save more than 6,000,000 MMBtu per year and an estimated $52,000,000 per year, plus improve process control and reduce waste.

Not Available

2002-11-01T23:59:59.000Z

139

Technology Needs Assessment Handbook | Open Energy Information  

Open Energy Info (EERE)

Technology Needs Assessment Handbook Technology Needs Assessment Handbook Jump to: navigation, search Tool Summary Name: Technology Needs Assessment Handbook Agency/Company /Organization: United Nations Development Programme Partner: United Nations Environment Programme Sector: Energy, Land Focus Area: Energy Efficiency Topics: Low emission development planning, Background analysis Resource Type: Guide/manual, Training materials, Lessons learned/best practices Website: content.undp.org/go/newsroom/publications/environment-energy/www-ee-li References: TNA Homepage[1] Logo: Technology Needs Assessment Handbook To assist countries, UNDP, in collaboration with Climate Technology Initiative (CTI), the EGTT and the UNFCCC Secretariat, developed a Handbook for conducting technology needs assessments for climate change.

140

Risk Assessment of Toxic Pollutants From Fossil Fuel Power Plants  

Science Conference Proceedings (OSTI)

Utilities operating coal-fired power plants must weigh the cost of controlling toxic releases against the risk of adverse human health effects. An EPRI-developed analytic framework offers guidance for such assessments, outlining mathematical modeling procedures for tracking pollutants in the environment and for estimating potential health risks to nearby populations.

1987-08-14T23:59:59.000Z

Note: This page contains sample records for the topic "information plant assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Assessment of Natural Gas Combined Cycle (NGCC) Plants with  

E-Print Network (OSTI)

Assessment of Natural Gas Combined Cycle (NGCC) Plants with CO2 Capture and Storage Mike Gravely.5 Million Annual Budget FY 10/11 · $62.5 million electric · $24 million natural gas · Program Research Areas:45 Bevilacqua-Knight, Inc's Role and Reference Documents Rich Myhre ­ Bevilacqua-Knight, Inc 3:05 Pacific Gas

142

Bioenergy Assessment Toolkit | Open Energy Information  

Open Energy Info (EERE)

Bioenergy Assessment Toolkit Bioenergy Assessment Toolkit Jump to: navigation, search Stage 3 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities Develop_BAU Stage 4: Prioritizing and Planning for Actions Begin execution of implementation plans 1.0. Organizing the LEDS Process 1.1. Institutional Structure for LEDS 1.2. Workplan to Develop the LEDS 1.3. Roles and responsibilities to develop LEDS 2.1. Assess current country plans, policies, practices, and capacities 2.2. Compile lessons learned and good practices from ongoing and previous sustainable development efforts in the country 2.3. Assess public and private sector capacity to support initiatives 2.4. Assess and improve the national GHG inventory and other economic and resource data as needed for LEDS development

143

Impact Assessment Toolkit | Open Energy Information  

Open Energy Info (EERE)

Impact Assessment Toolkit Impact Assessment Toolkit Jump to: navigation, search Stage 3 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities Develop_BAU Stage 4: Prioritizing and Planning for Actions Begin execution of implementation plans 1.0. Organizing the LEDS Process 1.1. Institutional Structure for LEDS 1.2. Workplan to Develop the LEDS 1.3. Roles and responsibilities to develop LEDS 2.1. Assess current country plans, policies, practices, and capacities 2.2. Compile lessons learned and good practices from ongoing and previous sustainable development efforts in the country 2.3. Assess public and private sector capacity to support initiatives 2.4. Assess and improve the national GHG inventory and other economic and resource data as needed for LEDS development

144

Impact Assessment Toolkit | Open Energy Information  

Open Energy Info (EERE)

Impact Assessment Toolkit Impact Assessment Toolkit (Redirected from Gateway:International/Economic and Environmental Impacts) Jump to: navigation, search Stage 3 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities Develop_BAU Stage 4: Prioritizing and Planning for Actions Begin execution of implementation plans 1.0. Organizing the LEDS Process 1.1. Institutional Structure for LEDS 1.2. Workplan to Develop the LEDS 1.3. Roles and responsibilities to develop LEDS 2.1. Assess current country plans, policies, practices, and capacities 2.2. Compile lessons learned and good practices from ongoing and previous sustainable development efforts in the country 2.3. Assess public and private sector capacity to support initiatives 2.4. Assess and improve the national GHG inventory and other

145

Land Use Assessment Toolkit | Open Energy Information  

Open Energy Info (EERE)

Land Use Assessment Toolkit Land Use Assessment Toolkit Jump to: navigation, search Stage 3 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities Develop_BAU Stage 4: Prioritizing and Planning for Actions Begin execution of implementation plans 1.0. Organizing the LEDS Process 1.1. Institutional Structure for LEDS 1.2. Workplan to Develop the LEDS 1.3. Roles and responsibilities to develop LEDS 2.1. Assess current country plans, policies, practices, and capacities 2.2. Compile lessons learned and good practices from ongoing and previous sustainable development efforts in the country 2.3. Assess public and private sector capacity to support initiatives 2.4. Assess and improve the national GHG inventory and other economic and resource data as needed for LEDS development

146

UNFCCC-Mitigation Assessments | Open Energy Information  

Open Energy Info (EERE)

UNFCCC-Mitigation Assessments UNFCCC-Mitigation Assessments Jump to: navigation, search Tool Summary LAUNCH TOOL Name: UNFCCC-Mitigation Assessments Agency/Company /Organization: United Nations Framework Convention on Climate Change Sector: Energy, Land Topics: Pathways analysis Resource Type: Presentation, Training materials Website: unfccc.int/resource/cd_roms/na1/mitigation/index.htm UNFCCC-Mitigation Assessments Screenshot References: UNFCCC-Mitigation Assessments[1] "This training package (containing PowerPoint presentations and notes, a handbook and reference materials) is designed to facilitate the preparation of the mitigation component of the national communications by non-Annex I teams based on UNFCCC guidelines contained in the annex to decision 17/CP.8." References

147

Information Foraging in Nuclear Power Plant Control Rooms  

SciTech Connect

nformation foraging theory articulates the role of the human as an 'informavore' that seeks information and follows optimal foraging strategies (i.e., the 'information scent') to find meaningful information. This paper briefly reviews the findings from information foraging theory outside the nuclear domain and then discusses the types of information foraging strategies operators employ for normal and off-normal operations in the control room. For example, operators may employ a predatory 'wolf' strategy of hunting for information in the face of a plant upset. However, during routine operations, the operators may employ a trapping 'spider' strategy of waiting for relevant indicators to appear. This delineation corresponds to information pull and push strategies, respectively. No studies have been conducted to determine explicitly the characteristics of a control room interface that is optimized for both push and pull information foraging strategies, nor has there been empirical work to validate operator performance when transitioning between push and pull strategies. This paper explores examples of control room operators as wolves vs. spiders and con- cludes by proposing a set of research questions to investigate information foraging in control room settings.

R.L. Boring

2011-09-01T23:59:59.000Z

148

Australia - Energy Resource Assessment | Open Energy Information  

Open Energy Info (EERE)

Australia - Energy Resource Assessment Australia - Energy Resource Assessment Jump to: navigation, search Name Australia - Energy Resource Assessment Agency/Company /Organization Australian Government Sector Energy Focus Area Conventional Energy, Energy Efficiency, Renewable Energy Topics Resource assessment Resource Type Publications Website https://www.ga.gov.au/image_ca Country Australia UN Region South-Eastern Asia, "Pacific" is not in the list of possible values (Eastern Africa, Middle Africa, Northern Africa, Southern Africa, Western Africa, Caribbean, Central America, South America, Northern America, Central Asia, Eastern Asia, Southern Asia, South-Eastern Asia, Western Asia, Eastern Europe, Northern Europe, Southern Europe, Western Europe, Australia and New Zealand, Melanesia, Micronesia, Polynesia, Latin America and the Caribbean) for this property.

149

A systems assessment of the five Starlite tokamak power plants  

SciTech Connect

The ARIES team has assessed the power-plant attractiveness of the following five tokamak physics regimes: (1) steady state, first stability regime; (2) pulsed, first stability regime; (3) steady state, second stability regime; (4) steady state, reversed shear; and (5) steady state, low aspect ratio. Cost-based systems analysis of these five tokamak physics regimes suggests that an electric power plant based upon a reversed-shear tokamak is significantly more economical than one based on any of the other four physics regimes. Details of this comparative systems analysis are described herein.

Bathke, C.G.

1996-07-01T23:59:59.000Z

150

Aging assessment of large electric motors in nuclear power plants  

Science Conference Proceedings (OSTI)

Large electric motors serve as the prime movers to drive high capacity pumps, fans, compressors, and generators in a variety of nuclear plant systems. This study examined the stressors that cause degradation and aging in large electric motors operating in various plant locations and environments. The operating history of these machines in nuclear plant service was studied by review and analysis of failure reports in the NPRDS and LER databases. This was supplemented by a review of motor designs, and their nuclear and balance of plant applications, in order to characterize the failure mechanisms that cause degradation, aging, and failure in large electric motors. A generic failure modes and effects analysis for large squirrel cage induction motors was performed to identify the degradation and aging mechanisms affecting various components of these large motors, the failure modes that result, and their effects upon the function of the motor. The effects of large motor failures upon the systems in which they are operating, and on the plant as a whole, were analyzed from failure reports in the databases. The effectiveness of the industry`s large motor maintenance programs was assessed based upon the failure reports in the databases and reviews of plant maintenance procedures and programs.

Villaran, M.; Subudhi, M. [Brookhaven National Lab., Upton, NY (United States)

1996-03-01T23:59:59.000Z

151

Transportation Assessment Toolkit | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Transportation Assessment Toolkit Jump to: navigation, search Stage 3 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities Develop_BAU Stage 4: Prioritizing and Planning for Actions Begin execution of implementation plans 1.0. Organizing the LEDS Process 1.1. Institutional Structure for LEDS 1.2. Workplan to Develop the LEDS 1.3. Roles and responsibilities to develop LEDS 2.1. Assess current country plans, policies, practices, and capacities 2.2. Compile lessons learned and good practices from ongoing and previous sustainable development efforts in the country

152

Building Energy Assessment Toolkit | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Building Energy Assessment Toolkit Jump to: navigation, search Stage 3 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities Develop_BAU Stage 4: Prioritizing and Planning for Actions Begin execution of implementation plans 1.0. Organizing the LEDS Process 1.1. Institutional Structure for LEDS 1.2. Workplan to Develop the LEDS 1.3. Roles and responsibilities to develop LEDS 2.1. Assess current country plans, policies, practices, and capacities 2.2. Compile lessons learned and good practices from ongoing and previous sustainable development efforts in the country

153

Assessment of Electromagnetic Interference Events in Nuclear Power Plants  

Science Conference Proceedings (OSTI)

This report presents a study and analysis of reported electromagnetic interference (EMI-) related incidents in nuclear power plants. These incidents were gathered primarily from the total body of incidents reported to the Institute of Nuclear Power Operations (INPO) database, with a few incidents coming from U.S. Nuclear Regulatory Commission (NRC) reports. This report analyzes trends and common factors in these events. The analysis is intended to inform the estimation of risk from EMI and offer suggesti...

2011-12-23T23:59:59.000Z

154

Predictive Maintenance Self-Assessment Guidelines for Nuclear Power Plants  

Science Conference Proceedings (OSTI)

There is a need at nuclear power plants for optimization and continuous improvement in the predictive maintenance (PdM) process. This need is based upon increased reliance on PdM to contribute to low unplanned capability loss factors, prevent significant equipment failures, reduce resources for maintenance, manage assets in support of license renewal and aging control, incorporate new technologies and advanced information management, and manage the risk associated with maintenance activities. This docume...

2000-11-28T23:59:59.000Z

155

Wind Resource Assessment Overview | Open Energy Information  

Open Energy Info (EERE)

Wind Resource Assessment Overview Wind Resource Assessment Overview Jump to: navigation, search Maps.jpg The first step in developing a wind project is to locate and quantify the wind resource. The magnitude of the wind and the characteristics of the resource are the largest factors in determining a potential site's economic and technical viability. There are three basic steps to identifying and characterizing the wind resource: prospecting, validating, and micrositing. The process of locating sites for wind energy development is similar to exploration for other resources, such as minerals and petroleum. Thus, the term prospecting is often used to describe the identification and preliminary evaluation of a wind resource area. Prospecting includes identifying potentially windy sites within a fairly large region - such

156

Methodology and Process for Condition Assessment at Existing Hydropower Plants  

SciTech Connect

Hydropower Advancement Project was initiated by the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy to develop and implement a systematic process with a standard methodology to identify the opportunities of performance improvement at existing hydropower facilities and to predict and trend the overall condition and improvement opportunity within the U.S. hydropower fleet. The concept of performance for the HAP focuses on water use efficiency how well a plant or individual unit converts potential energy to electrical energy over a long-term averaging period of a year or more. The performance improvement involves not only optimization of plant dispatch and scheduling but also enhancement of efficiency and availability through advanced technology and asset upgrades, and thus requires inspection and condition assessment for equipment, control system, and other generating assets. This paper discusses the standard methodology and process for condition assessment of approximately 50 nationwide facilities, including sampling techniques to ensure valid expansion of the 50 assessment results to the entire hydropower fleet. The application and refining process and the results from three demonstration assessments are also presented in this paper.

Zhang, Qin Fen [ORNL; Smith, Brennan T [ORNL; Cones, Marvin [Mesa Associates, Inc.; March, Patrick [Hydro Performance Processes, Inc.; Dham, Rajesh [U.S. Department of Energy; Spray, Michael [New West Technologies, LLC.

2012-01-01T23:59:59.000Z

157

An Information Visualization Approach to Intelligent Building Assessment  

E-Print Network (OSTI)

This paper presents a Knowledge-oriented Information Visualization (KIV) approach to facilitating the implementation of building rating systems such as the Asian Intelligent Building Index (AIIB) for the post-assessment of Intelligent Buildings (IBs). The KIV approach is introduced by using a prototype of KIV for IB assessment. The KIV model consists of several toolkits, including an IB Casebase for the Applications of Sustainable Technology (called IB-CAST), a web-oriented information visualization toolkit for IB assessment using Microsoft Office (called IB-Radar and IB-Compass), and a Geographical Information System (GIS) toolkit for bridging knowledge (called IB-GIS) in IB assessment, etc. A case study is used to demonstrate how the KIV approach can be applied to support IB assessment.

Hong, J.; Chen, Z.; Li, H.; Xu, Q.

2006-01-01T23:59:59.000Z

158

INFORMATION INTEGRATION IN CONTROL ROOMS AND TECHNICAL OFFICES IN NUCLEAR POWER PLANTS  

E-Print Network (OSTI)

Information integration in control rooms and technical offices in nuclear power plants Report prepared within the framework of the

unknown authors

2001-01-01T23:59:59.000Z

159

An Inspector's Assessment of the New Model Safeguards Approach for Enrichment Plants  

SciTech Connect

This conference paper assesses the changes that are being made to the Model Safeguards Approach for Gas Centrifuge Enrichment Plants.

Curtis, Michael M.

2007-07-31T23:59:59.000Z

160

Wind Resource Assessment | Open Energy Information  

Open Energy Info (EERE)

Assessment Assessment Jump to: navigation, search Maps Central America 50m Wind Power China Chifeng 50m Wind Power China Enshi 50m Wind Power China Fuzhou 50m Wind Power China Guangzhou 50m Wind Power China Haikou 50m Wind Power China Hangzhou 50m Wind Power China Hohhot 50m Wind Power China Jiamusi 50m Wind Power China Manzhouli 50m Wind Power China Nanchang 50m Wind Power China Qingdao 50m Wind Power China Qiqihar 50m Wind Power China Shenyang 50m Wind Power China Tianjin 50m Wind Power China Yinchuan 50m Wind Power East China Map Reference NREL-30m-US-Wind NREL-50m-Alaska-Wind-Map NREL-50m-Alaska-Wind-Map NREL-Alaska-50m-Wind-Resource NREL-Arizona-50m-Wind-Resource NREL-Arkansas-50m-Wind-Resource NREL-Atlantic-Coast-90m-Offshore-Wind-Resource NREL-CA-90mwindspeed-off NREL-CT-90mwindspeed-off

Note: This page contains sample records for the topic "information plant assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Pridneprovsk Power Plant Dniperpetrosk, Ukraine. Combined cycle project. Export trade information  

Science Conference Proceedings (OSTI)

The report presents the results of an inspection of the Pridneprovsk Power Plant near Kiev, Ukraine made by a team of engineers to assess the feasibility of repowering the 600 MW portion of the existing 2400 MW plant. The study develops concepts and cost estimates for repowering the Pridneprovsk plant in two phases or blocks. The study develops costs for Phase I only. The report is presented in seven sections which include an Introduction, a Summary, a Facsimile of Protocol Agreement Signed by the NRG and the Ministry of Power and Electrification of Ukraine, a description of the Mechanical Systems and Equipment, a description of the Structural Systems and Equipment, a description of the Chemical Systems and Equipment, and a description of the Electrical Equipment and Systems. The report includes appendices which provide detailed information on the cost, schedules, heat balances, and piping instrument diagrams for the first block of the project.

NONE

1992-11-01T23:59:59.000Z

162

Seismic Margin Assessment of the Edwin I. Hatch Nuclear Plant, Unit 1  

Science Conference Proceedings (OSTI)

A seismic margin assessment of the Georgia Power Company Edwin I. Hatch, unit 1 nuclear power plant showed the practicality of an EPRI methodology for assessing the ability of nuclear plants to withstand large earthquakes. The assessment, performed by the utility, established that the plant can withstand an earthquake at least twice the magnitude for which it was designed.

1991-08-01T23:59:59.000Z

163

Value impact assessment: A preliminary assessment of improvement opportunities at the Quantico Central Heating Plant  

Science Conference Proceedings (OSTI)

This report presents the results of a preliminary assessment of opportunities for improvement at the US Marine Corps (USMC) Quantico, Virginia, Central Heating Plant (CHP). This study is part of a program intended to provide the CHP staff with a computerized Artificial Intelligence (AI) decision support system that will assist in a more efficient, reliable, and safe operation of their plant. As part of the effort to provide the AI decision support system, a team of six scientists and engineers from the Pacific Northwest Laboratory (PNL) visited the plant to characterize the conditions and environment of the CHP. This assessment resulted in a list of potential performance improvement opportunities at the CHP. In this report, 12 of these opportunities are discussed and qualitatively analyzed. 70 refs., 7 figs., 6 tabs.

Brambley, M.R.; Weakley, S.A.

1990-09-01T23:59:59.000Z

164

Impact Assessment Toolkit | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Impact Assessment Toolkit Jump to: navigation, search Economic Community of West African States (ECOWAS) Clean Energy Gateway Home | About | News | Links | Help | Countries Benin | Burkina Faso | Cape Verde | Gambia | Ghana | Guinea| Guinea-Bissau | Ivory Coast | Liberia | Mali | Niger | Nigeria | Senegal | Sierra Leone | Togo Countries ECREEE light.JPG FBenin.png FBurkinaFaso.png FCapeVerde.png FGambia.png FGhana.png FGuinea.png FGuinea-Bissau.png Benin Burkina Faso Cape Verde Gambia Ghana Guinea Guinea-Bissau FIvoryCoast.png FLiberia.png FMali.png FNiger.png FNigeria.png FSenegal.png FSierraLeone.png FTogo.png

165

Assessment of the Diffusive Gradients in Thin-films (DGT) technique to assess the plant availability of Mn in soils.  

E-Print Network (OSTI)

predicts copper availability to plants. EnvironmentalAttempts to assess Mn availability have been impeded due towill influence the Mn availability. Often flooding of soils

Mundus, Simon; Husted, Sren; Lombi, Enzo

2009-01-01T23:59:59.000Z

166

Power plant system assessment. Final report. SP-100 Program  

SciTech Connect

The purpose of this assessment was to provide system-level insights into 100-kWe-class space reactor electric systems. Using these insights, Rockwell was to select and perform conceptual design studies on a ''most attractive'' system that met the preliminary design goals and requirements of the SP-100 Program. About 4 of the 6 months were used in the selection process. The remaining 2 months were used for the system conceptual design studies. Rockwell completed these studies at the end of FY 1983. This report summarizes the results of the power plant system assessment and describes our choice for the most attractive system - the Rockwell SR-100G System (Space Reactor, 100 kWe, Growth) - a lithium-cooled UN-fueled fast reactor/Brayton turboelectric converter system.

Anderson, R.V.; Atkins, D.F.; Bost, D.S.; Berman, B.; Clinger, D.A.; Determan, W.R.; Drucker, G.S.; Glasgow, L.E.; Hartung, J.A.; Harty, R.B.

1983-10-31T23:59:59.000Z

167

Chinese Oil Plants Information System (COPIS): An on-line information store, query and management system for three chinese industrial oil plants  

Science Conference Proceedings (OSTI)

Researches on Cornus wilsoniana, Ricinus communis, and Symplocos paniculata have generated a large amount of data. In order to assist researchers to store and exchange data efficiently, an on-line interactive platform, called Chinese Oil Plants Information ... Keywords: Brower/Server structure, COPIS, Information system, Oil plant, Three-layer structure

Qian-Qian Liu; Li-Juan Jiang; Jin Han; Qiang Liu; Xiang Yin; Pei-Wang Li

2013-01-01T23:59:59.000Z

168

Pilot Application of Risk-Informed Safety Margins to Support Nuclear Plant Long-Term Operation Decisions  

Science Conference Proceedings (OSTI)

This report describes an industry application of the risk-informed safety margin characterization (RISMC) framework to the analysis of the impacts of a power uprate to a loss of main feedwater (LOMFW) event. The primary objective of this effort was to assess the changes in the safety margins for this event that result from the elevated power levels associated with a hypothetical plant power uprate. This analysis focused on the probabilistic risk assessment modeling of feed-and-bleed operation for ...

2012-12-12T23:59:59.000Z

169

Transportation Assessment Toolkit/Home | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Transportation Assessment Toolkit/Home < Transportation Assessment Toolkit Jump to: navigation, search Home Transport Topics Ask an Expert Training Contact us What are the key actions necessary to implementing a transportation system LEDS? Action 1: Evaluate the existing transport system Action 2: Develop BAU scenario Action 3: Assess opportunities Avoid-Shift-Improve framework of strategies Action 4: Develop alternative scenarios Action 5: Prioritize and plan Action 6: Implement and monitor Transportation Assessment Toolkit Train licensed.png Transportation Assessment Toolkit Information licensed.png Transportation Assessment Toolkit Learning licensed.png

170

European Commission Impact Assessment Tools | Open Energy Information  

Open Energy Info (EERE)

European Commission Impact Assessment Tools European Commission Impact Assessment Tools Jump to: navigation, search Tool Summary Name: IPTS-IA Tools Agency/Company /Organization: European Commission Joint Research Centre Sector: Energy Topics: Co-benefits assessment Resource Type: Guide/manual, Publications, Software/modeling tools User Interface: Other Website: iatools.jrc.ec.europa.eu/bin/view/IQTool/WebHome.html IPTS-IA Tools Screenshot References: IPTS-IA Tools[1] Overview "IA TOOLS is an online platform that provides Commission policy actors and impact assessment practitioners throughout Europe with a repository of guidance, information and best practices for the impact assessment of new policies and legislative measures. At one click, the IA TOOLS website provides expert and non-expert with guidance on the main steps to be

171

First responder information flow simulation: a tool for technology assessment  

Science Conference Proceedings (OSTI)

New information technology is becoming available for first responders at a rapid rate. Often this new technology comes with not only new capabilities but also a high price tag. Policy makers and emergency managers need a way to assess which portfolio ...

C. Donald Robinson; Donald E. Brown

2005-12-01T23:59:59.000Z

172

Preliminary assessment of Fort Hood solar cogeneration plant performance  

DOE Green Energy (OSTI)

An analysis has been performed to enable a preliminary assessment of the performance that can be expected of a solar thermal cogeneration system designed to serve a selected group of buildings at Fort Hood, Texas. A central receiver system utilizing a molten salts mixture as the receiver coolant, heat transfer fluid, and storage medium is assumed. The system is to supply a large share of the space heating, air conditioning, domestic hot water, and electricity needs of a 20-building Troop Housing Complex. Principal energy loads are graphed and tabulated, and the principal electric parasitic loads are tabulated and the methodology by which they are estimated is reviewed. The plant model and the performance calculations are discussed. Annual energy displacement results are given. (LEW)

Ator, J.

1981-04-01T23:59:59.000Z

173

Zhangbei Guotou Wind Power Plant | Open Energy Information  

Open Energy Info (EERE)

Zhangbei Guotou Wind Power Plant Jump to: navigation, search Name Zhangbei Guotou Wind Power Plant Place Beijing Municipality, China Zip 100037 Sector Wind energy Product A company...

174

Assessment of plant-derived hydrocarbons. Final report  

DOE Green Energy (OSTI)

A number of hydrocarbon producing plants are evaluated as possible sources of rubber, liquid fuels, and industrial lubricants. The plants considered are Euphorbia lathyris or gopher plant, milkweeds, guayule, rabbit brush, jojoba, and meadow foam. (ACR)

McFadden, K.; Nelson, S.H.

1981-09-30T23:59:59.000Z

175

Assessing the costs of solar power plants for the Island of Roatn  

E-Print Network (OSTI)

This is an analysis assessing the installation costs of different solar power plant technologies and the current commercial availability for installation on the Island or Roatn. Commercial large-scale power plants have ...

Huwe, Ethan (Ethan L.)

2011-01-01T23:59:59.000Z

176

Capturing Historical Knowledge for Decommissioning of Nuclear Power Plants: Summary of Historical Site Assessments at Eight Decommis sioning Plants  

Science Conference Proceedings (OSTI)

This report describes approaches utilized and experience gained in the development of early characterization activities by a number of nuclear power plants undergoing decommissioning. In particular, the report provides experience and lessons of performing the Historical Site Assessment, or HSA.

2004-04-01T23:59:59.000Z

177

Direct application of west coast geothermal resources in a wet corn milling plant supplementary analyses and information dissemination. Final report, addendum  

DOE Green Energy (OSTI)

In an extension to the scope of the previous studies, supplementary analyses were to be performed for both plants which would assess the economics of geothermal energy if coal had been the primary fuel rather than oil and gas. The studies include: supplementary analysis for a coal fired wet corn milling plant, supplementary analysis for an East Coast frozen food plant with coal fired boilers, and information dissemination activities.

Not Available

1982-03-19T23:59:59.000Z

178

Cost Estimation Methodology for NETL Assessments of Power Plant Performance  

NLE Websites -- All DOE Office Websites (Extended Search)

Q Q Q U U A A L L I I T T Y Y G G U U I I D D E E L L I I N N E E S S F F O O R R E E N N E E R R G G Y Y S S Y Y S S T T E E M M S S T T U U D D I I E E S S C C o o s s t t E E s s t t i i m m a a t t i i o o n n M M e e t t h h o o d d o o l l o o g g y y f f o o r r N N E E T T L L A A s s s s e e s s s s m m e e n n t t s s o o f f P P o o w w e e r r P P l l a a n n t t P P e e r r f f o o r r m m a a n n c c e e March 2010 DOE/NETL-2010/???? April 2011 DOE/NETL-2011/1455 National Energy Technology Laboratory Office of Program Planning and Analysis 2 Power Plant Cost Estimation Methodology Quality Guidelines for Energy Systems Studies April 2011 Quality Guidelines for Energy Systems Studies Cost Estimation Methodology for NETL Assessments of Power Plant Performance Introduction This paper summarizes the costing methodology employed by NETL in its costing models and baseline reports. Further, it defines the specific levels of capital cost as well as outlines the costing metrics by which

179

A comprehensive plant-wide assessment of Amcor PET Packaging at Fairfield, California  

SciTech Connect

This report includes the results of the plant-wide assessment of AMCOR PET plants in Fairfield, City of Commerce, and Lathrop California. The project (except the assessment of Lathrop plant) was a cost shared effort between US Department of Energy through Golden Field Office, Golden CO and AMCOR PET Packaging Co. The DOE share of the plant-wide assessment cost was awarded to AMCOR PET in response to the RFP DE-PS36-05GO95009, the 2005 round of funding for Plant-Wide Energy Efficiency Opportunity Assessments. The plant-wide assessment included the processes, electrical and gas equipment. Current production practices have been evaluated against best practice standards, as well as utilization of modern technology to improve energy efficiency, reduce the wastes, and improve productivity.

Kevin Losh; Hui Choi; Yin Yin Wu; Bryan W. Hackett; Ahmad R. Ganji

2008-02-29T23:59:59.000Z

180

Risk-informed incident management for nuclear power plants  

E-Print Network (OSTI)

Decision making as a part of nuclear power plant operations is a critical, but common, task. Plant management is forced to make decisions that may have safety and economic consequences. Formal decision theory offers the ...

Smith, Curtis Lee, 1966-

2002-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "information plant assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Aging assessment of surge protective devices in nuclear power plants  

SciTech Connect

An assessment was performed to determine the effects of aging on the performance and availability of surge protective devices (SPDs), used in electrical power and control systems in nuclear power plants. Although SPDs have not been classified as safety-related, they are risk-important because they can minimize the initiating event frequencies associated with loss of offsite power and reactor trips. Conversely, their failure due to age might cause some of those initiating events, e.g., through short circuit failure modes, or by allowing deterioration of the safety-related component(s) they are protecting from overvoltages, perhaps preventing a reactor trip, from an open circuit failure mode. From the data evaluated during 1980--1994, it was found that failures of surge arresters and suppressers by short circuits were neither a significant risk nor safety concern, and there were no failures of surge suppressers preventing a reactor trip. Simulations, using the ElectroMagnetic Transients Program (EMTP) were performed to determine the adequacy of high voltage surge arresters.

Davis, J.F.; Subudhi, M. [Brookhaven National Lab., Upton, NY (United States)] [Brookhaven National Lab., Upton, NY (United States); Carroll, D.P. [Florida Univ., Gainesville, FL (United States)] [Florida Univ., Gainesville, FL (United States)

1996-01-01T23:59:59.000Z

182

Bogoroditsk Plant of Technochemical Products BTCP | Open Energy Information  

Open Energy Info (EERE)

Bogoroditsk Plant of Technochemical Products BTCP Bogoroditsk Plant of Technochemical Products BTCP Jump to: navigation, search Name Bogoroditsk Plant of Technochemical Products (BTCP) Place Russian Federation Zip 301801 Sector Solar Product BTCP is a high technology company established to pursue the production of electronic components and solar initiatives. References Bogoroditsk Plant of Technochemical Products (BTCP)[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Bogoroditsk Plant of Technochemical Products (BTCP) is a company located in Russian Federation . References ↑ "Bogoroditsk Plant of Technochemical Products (BTCP)" Retrieved from "http://en.openei.org/w/index.php?title=Bogoroditsk_Plant_of_Technochemical_Products_BTCP&oldid=342960

183

Biennial Assessment of the Fifth Power Plan Gas Turbine Power Plant Planning Assumptions  

E-Print Network (OSTI)

Biennial Assessment of the Fifth Power Plan Gas Turbine Power Plant Planning Assumptions October 17, 2006 Simple- and combined-cycle gas turbine power plants fuelled by natural gas are among the bulk-emission and efficient gas turbine technology made combined-cycle gas turbine power plants the "resource of choice

184

Assessment of Potential Benzene Contamination of the Ogallala Aquifer at the Pantex Plant, Texas  

E-Print Network (OSTI)

Assessment of Potential Benzene Contamination of the Ogallala Aquifer at the Pantex Plant, Texas National Laboratory Brian Looney, Savannah River Site Background and Objectives: In 1999 the Pantex Plant by these sampling results, Pantex Plant personnel initiated an internal investigative program to determine

Hazen, Terry

185

Circular Economy Assessment for Coal-fired Power Plants Based on Supper-Efficiency DEA Model  

Science Conference Proceedings (OSTI)

Coal-fired power plants are the main pollution source in most areas of China. The implementation of circular economy in coal-fired power plants is necessary for environmental protection and also an effective way of energy saving and emission reduction. ... Keywords: circular economy assessment, circular economy improvement, coal-fired power plant, super-efficiency data envelopment analysis

Shao-lun Zeng; Hong Hu; Wei Wang

2009-10-01T23:59:59.000Z

186

Comparative Assessment of Coal-and Natural Gas-fired Power Plants under a  

E-Print Network (OSTI)

Comparative Assessment of Coal- and Natural Gas-fired Power Plants under a CO2 Emission Performance standard (EPS) for pulverized coal (PC) and natural gas combined cycle (NGCC) power plants; · Evaluate · Coal-fired Power Plant: Supercritical pulverized coal (SC PC) Illinois #6 Coal Capacity Factor 75

187

Assessement of Codes and Standards Applicable to a Hydrogen Production Plant Coupled to a Nuclear Reactor  

DOE Green Energy (OSTI)

This is an assessment of codes and standards applicable to a hydrogen production plant to be coupled to a nuclear reactor. The result of the assessment is a list of codes and standards that are expected to be applicable to the plant during its design and construction.

M. J. Russell

2006-06-01T23:59:59.000Z

188

Assess your starting point | ENERGY STAR Buildings & Plants  

NLE Websites -- All DOE Office Websites (Extended Search)

to maximize savings. EPA has two tools to help you assess your starting point: Use the Energy Program Assessment Matrix to compare your organization's energy management...

189

MHK Technologies/Morild Power Plant | Open Energy Information  

Open Energy Info (EERE)

Morild Power Plant Morild Power Plant < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage Morild Power Plant.jpg Technology Profile Primary Organization Hydra Tidal Energy Technology AS Project(s) where this technology is utilized *MHK Projects/MORILD Demonstration Plant Technology Resource Click here Current/Tidal Technology Type Click here Axial Flow Turbine Technology Readiness Level Click here TRL 5/6: System Integration and Technology Laboratory Demonstration Technology Description The Morild power plant is a floating, moored construction based on the same principle as horizontal axis wind turbines. The plant has 4 two-blade underwater turbines and can utilize the energy potential in tidal and ocean currents. The 4 turbines transmit power via hydraulic transmission to 2 synchronous generators. Can be pitched 180 degrees to utilize energy in both directions. A cable from the transformer on the prototype to shore transfers energy.

190

ENERGY STAR Labeled Buildings and Plants | Open Energy Information  

Open Energy Info (EERE)

STAR Labeled Buildings and Plants STAR Labeled Buildings and Plants Jump to: navigation, search Name ENERGY STAR Labeled Buildings and Plants Data Format Excel Spreadsheet Geographic Scope United States TODO: Import actual dataset contents into OpenEI The ENERGY STAR Labeled Buildings and Plants is "a list of facilities that measurably cost less to operate and improve the quality of our environment."[1] It is produced by the United States Environmental Protection Agency. External links Dataset in Excel Format References ↑ "ENERGY STAR Labeled Buildings and Plants" Retrieved from "http://en.openei.org/w/index.php?title=ENERGY_STAR_Labeled_Buildings_and_Plants&oldid=298127" Categories: Datasets Articles with outstanding TODO tasks What links here Related changes

191

Assessment of next generation nuclear plant intermediate heat exchanger design.  

DOE Green Energy (OSTI)

The Next Generation Nuclear Plant (NGNP), which is an advanced high temperature gas reactor (HTGR) concept with emphasis on production of both electricity and hydrogen, involves helium as the coolant and a closed-cycle gas turbine for power generation with a core outlet/gas turbine inlet temperature of 900-1000 C. In the indirect cycle system, an intermediate heat exchanger is used to transfer the heat from primary helium from the core to the secondary fluid, which can be helium, nitrogen/helium mixture, or a molten salt. The system concept for the vary high temperature reactor (VHTR) can be a reactor based on the prismatic block of the GT-MHR developed by a consortium led by General Atomics in the U.S. or based on the PBMR design developed by ESKOM of South Africa and British Nuclear Fuels of U.K. This report has made an assessment on the issues pertaining to the intermediate heat exchanger (IHX) for the NGNP. A detailed thermal hydraulic analysis, using models developed at ANL, was performed to calculate heat transfer, temperature distribution, and pressure drop. Two IHX designs namely, shell and straight tube and compact heat exchangers were considered in an earlier assessment. Helical coil heat exchangers were analyzed in the current report and the results were compared with the performance features of designs from industry. In addition, a comparative analysis is presented between the shell and straight tube, helical, and printed circuit heat exchangers from the standpoint of heat exchanger volume, primary and secondary sides pressure drop, and number of tubes. The IHX being a high temperature component, probably needs to be designed using ASME Code Section III, Subsection NH, assuming that the IHX will be classified as a class 1 component. With input from thermal hydraulic calculations performed at ANL, thermal conduction and stress analyses were performed for the helical heat exchanger design and the results were compared with earlier-developed results on shell and straight tube and printed circuit heat exchangers.

Majumdar, S.; Moisseytsev, A.; Natesan, K.; Nuclear Engineering Division

2008-10-17T23:59:59.000Z

192

MHK Technologies/OTEC Plant | Open Energy Information  

Open Energy Info (EERE)

Stage Dev Design Engineering Technology Description OTEC to operate land based OTEC desalination plants Technology Dimensions Device Testing Date Submitted 00:48.6 << Return to the...

193

Changes related to "Geothermal/Power Plant" | Open Energy Information  

Open Energy Info (EERE)

pages linked to the given page instead Go 27 June 2013 (diff | hist) . . GRRSection 7 - Power Plant Siting, Construction, and Regulation Overview; 09:25 . . (+481) . ....

194

Preliminary assessment of the modular block power plant concept  

SciTech Connect

Adding capacity to coal-fired plants in small increments of an overall integrated program may be the solution to the 10-year lead time required for the construction of a new plant. A preliminary study evaluates the technical and economic feasibility of a modular natural gas and coal-fired combined-cycle power plant which can be installed in three distinct phases. The plant sizes are suitable for large industrial and utility applications. The Modular Block Power Plant (MBPP) concept offers the advantages of phase construction, lower capital cost, lower cost electricity, lower air emissions, lower water requirements, and reduced solid waste discharge. Other advantages include part load availability, reduced coal inventory requirements, and easier plant siting. 11 figures, 4 tables.

1984-01-01T23:59:59.000Z

195

Environmental assessment for commercialization of the Mound Plant  

Science Conference Proceedings (OSTI)

In November 1993 US DOE decided to phase out operations at the Mound Plant in Miamisburg, Ohio, with the goal of releasing the site for commercial use. The broad concept is to transform the plant into an advanced manufacturing center with the main focus on commercializing products and other technology. DOE proposes to lease portions of the Mound Plant to commercial enterprises. This Environmental Impact statement has a finding of no significant impact in reference to such action.

Not Available

1994-10-26T23:59:59.000Z

196

Solar Resource Assessment: Databases, Measurements, Models, and Information Sources (Fact Sheet)  

DOE Green Energy (OSTI)

Fact sheet for Solar Resource Assessment Workshop, Denver CO, Oct 29, 2008: ?Solar Resource Assessment Databases, Measurements, Models, and Information Sources

Not Available

2008-10-01T23:59:59.000Z

197

Assessment of Nuclear Safety Culture at the Pantex Plant, November...  

NLE Websites -- All DOE Office Websites (Extended Search)

the Plant. Human Performance Improvement Coordinator works with the Safety Team and Human Error team from BBS to conduct human performance evaluations. B-12 Data on the...

198

Life cycle assessment of a pumped storage power plant.  

E-Print Network (OSTI)

?? Wind and solar power plants are gaining increasing attention due to low green house gas emissions associated with electricity generation. The installed capacity of (more)

Torres, Octavio

2011-01-01T23:59:59.000Z

199

Economic assessment of polymer concrete usage in geothermal power plants  

DOE Green Energy (OSTI)

Results of a study established to review the Heber and Niland, California 50 MWe conceptual geothermal power plants designs and to identify areas where non-metallic materials, such as polymer concrete, can be technically and economically employed are reported. Emphasis was directed toward determining potential economic advantages and resulting improvements in plant availability. It is estimated that use of polymer concrete in the Heber plant will effect a savings of 6.18 mills per KWH in the cost of power delivered to the network, a savings of 9.7%. A similar savings should be effected in the Niland plant.

Not Available

1977-11-01T23:59:59.000Z

200

Property:Plants with Unknown Planned Capacity | Open Energy Information  

Open Energy Info (EERE)

Plants with Unknown Planned Capacity Plants with Unknown Planned Capacity Jump to: navigation, search Property Name Plants with Unknown Planned Capacity Property Type String Description Number of plants with unknown planned capacity per GEA Pages using the property "Plants with Unknown Planned Capacity" Showing 21 pages using this property. A Alaska Geothermal Region + 1 + C Cascades Geothermal Region + 2 + Central Nevada Seismic Zone Geothermal Region + 9 + G Gulf of California Rift Zone Geothermal Region + 4 + H Hawaii Geothermal Region + 0 + Holocene Magmatic Geothermal Region + 0 + I Idaho Batholith Geothermal Region + 1 + N Northern Basin and Range Geothermal Region + 11 + Northern Rockies Geothermal Region + 0 + Northwest Basin and Range Geothermal Region + 9 + R Rio Grande Rift Geothermal Region + 1 +

Note: This page contains sample records for the topic "information plant assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

GRR/Section 20 - Plant Decommissioning Overview | Open Energy Information  

Open Energy Info (EERE)

20 - Plant Decommissioning Overview 20 - Plant Decommissioning Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 20 - Plant Decommissioning Overview 20PlantDecommissioningOverview (1).pdf Click to View Fullscreen Contact Agencies BLM Regulations & Policies 43 CFR 3263.10-3263.15: Well Abandonment Geothermal Resources Operational Order No.3 Triggers None specified Click "Edit With Form" above to add content 20PlantDecommissioningOverview (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative State and federal laws have specific requirements for the decommissioning process. 20.1 to 20.2 - Will a Geothermal Well be Abandoned?

202

DOEEA-1178 Assessment 300 Area Steam Plant Replacement, Hanford Site, Richland, Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 Assessment 300 Area Steam Plant Replacement, Hanford Site, Richland, Washington U.S. Department of Energy Washington, D.C. March 1997 , DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, make any warranty, express or implied, or assumes any legal liabili- ty or mponsibility for the accuracy, completeness, or usefulness of any information, appa- ratus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or s e m ' c e by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or

203

ASSESSMENT OF LOW COST NOVEL SORBENTS FOR COAL-FIRED POWER PLANT MERCURY CONTROL  

Science Conference Proceedings (OSTI)

This is a Technical Report under a program funded by the Department of Energy's National Energy Technology Laboratory (NETL) to obtain the necessary information to assess the viability of lower cost alternatives to commercially available activated carbon for mercury control in coal-fired utilities. During this reporting period, several sorbent samples have been tested by URS in their laboratory fixed-bed system. The sorbents were evaluated under conditions simulating flue gas from power plants burning Powder River Basin (PRB) and low sulfur eastern bituminous coals. The equilibrium adsorption capacities of the sorbents for both elemental and oxidized mercury are presented. A team meeting discussing the overall program and meetings with Midwest Generation and Wisconsin Electric Power Company (WEPCO) concerning field testing occurred during this reporting period.

Sharon Sjostrom

2002-02-22T23:59:59.000Z

204

DOE PLANT-WIDE ENERGY ASSESSMENT RESULTS RELATED TO THE U. S. AUTOMOTIVE INDUSTRY  

SciTech Connect

Forty-nine plant-wide energy efficiency assessments have been undertaken under sponsorship of the U.S. Department of Industrial Technologies Program. Plant-wide assessments are comprehensive, systematic investigations of plant energy efficiency, including plant utility systems and process operations. Assessments in industrial facilities have highlighted opportunities for implementing best practices in industrial energy management, including the adoption of new, energy-efficient technologies and process and equipment improvements. Total annual savings opportunities of $201 million have been identified from the 40 completed assessments. Many of the participating industrial plants have implemented efficiency-improvement projects and already have realized total cost savings of more than $81 million annually. This paper provides an overview of the assessment efforts undertaken and presents a summary of the major energy and cost savings identified to date. The paper also discusses specific results from assessments conducted at four plants in the automotive manufacturing operations and supporting industries. These particular assessments were conducted at facilities that produce engine castings, plastic films used for glass laminates, forged components, and at a body spray painting plant.

Kelly Kissock, Arvind Thekdi, Len Bishop

2006-01-05T23:59:59.000Z

205

Trial Plant Review of an American Nuclear Society External Event Probabilistic Risk Assessment Standard  

Science Conference Proceedings (OSTI)

This study examined a representative set of Seismic Probabilistic Risk Assessments (SPRAs) and Seismic Margin Assessments (SMAs) performed for U.S. nuclear plants and evaluated them against the American Nuclear Society's draft External-Event PRA Methodology Standard for conducting Probabilistic Risk Assessment of external events.

2003-09-22T23:59:59.000Z

206

Assessing the cumulative effects of projects using geographic information systems  

SciTech Connect

Systems that allow users to store and retrieve spatial data, provide for analyses of spatial data, and offer highly detailed display of spatial data are referred to as geographic information systems, or more typically, GIS. Since their initial usage in the 1960s, GISs have evolved as a means of assembling and analyzing diverse data pertaining to specific geographical areas, with spatial locations of the data serving as the organizational basis for the information systems. The structure of GISs is built around spatial identifiers and the methods used to encode data for storage and manipulation. This paper examines how GIS has been used in typical environmental assessment, its use for cumulative impact assessment, and explores litigation that occurred in the United States Federal court system where GIS was used in some aspect of cumulative effects. The paper also summarizes fifteen case studies that range from area wide transportation planning to wildlife and habitat impacts, and draws together a few lessons learned from this review of literature and litigation.

Atkinson, Samuel F., E-mail: atkinson@unt.edu [Institute of Applied Science, University of North Texas, 1155 Union Circle 310559, Denton, TX 76203 (United States); Canter, Larry W., E-mail: envimptr@aol.com [Environmental Impact Training, P.O. Box 9143, Horseshoe Bay, TX 78657 (United States)

2011-09-15T23:59:59.000Z

207

Performance Assessment of Flashed Steam Geothermal Power Plant  

DOE Green Energy (OSTI)

Five years of operating experience at the Comision Federal de Electricidad (CFE) Cerro Prieto flashed steam geothermal power plant are evaluated from the perspective of U. S. utility operations. We focus on the design and maintenance of the power plant that led to the achievement of high plant capacity factors for Units No. 1 and 2 since commercial operation began in 1973. For this study, plant capacity factor is the ratio of the average load on the machines or equipment for the period of time considered to the capacity rating of the machines or equipment. The plant capacity factor is the annual gross output in GWh compared to 657 GWh (2 x 37.5 MW x 8760 h). The CFE operates Cerro Prieto at base load consistent with the system connected electrical demand of the Baja California Division. The plant output was curtailed during the winter months of 1973-1975 when the system electric demand was less than the combined output capability of Cerro Prieto and the fossil fuel plant near Tijuana. Each year the system electric demand has increased and the Cerro Prieto units now operate at full load all the time. The CFE added Units 3 and 4 to Cerro Prieto in 1979 which increased the plant name plate capacity to 150 MW. Part of this additional capacity will supply power to San Diego Gas and Electric Company through an interconnection across the border. The achievement of a high capacity factor over an extensive operating period was influenced by operation, design, and maintenance of the geothermal flash steam power plant.

Alt, Theodore E.

1980-12-01T23:59:59.000Z

208

Nove Power Plant Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Nove Power Plant Biomass Facility Nove Power Plant Biomass Facility Jump to: navigation, search Name Nove Power Plant Biomass Facility Facility Nove Power Plant Sector Biomass Facility Type Landfill Gas Location Contra Costa County, California Coordinates 37.8534093°, -121.9017954° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.8534093,"lon":-121.9017954,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

209

MHK Technologies/Floating anchored OTEC plant | Open Energy Information  

Open Energy Info (EERE)

anchored OTEC plant anchored OTEC plant < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage Floating anchored OTEC plant.jpg Technology Profile Primary Organization LAUSDEO Incorporated Technology Resource Click here OTEC Technology Type Click here OTEC - Closed Cycle Technology Readiness Level Click here TRL 4 Proof of Concept Technology Description Anchored floating OTEC plant Small volume above ocean surface so that device can avoid damage due to severe weather Water depth must exceed 600 meters Prefer to use power line to transmit electricity to shore facility Can use electrolysis to produce hydrogen and transport hydrogen to floating or shore facility Mooring Configuration The preferred mooring configuration is gravity base with three bottom weights The weights can be at depths up to 3000 meters

210

Malavi Power Plant Ltd MPPL pltd | Open Energy Information  

Open Energy Info (EERE)

Malavi Power Plant Ltd MPPL pltd Malavi Power Plant Ltd MPPL pltd Jump to: navigation, search Name Malavi Power Plant Ltd. (MPPL pltd) Place Bangalore, India Zip 560 001 Sector Biomass Product Biomass/biogas project developer and plant operator. Coordinates 12.97092°, 77.60482° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":12.97092,"lon":77.60482,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

211

MHK Technologies/European Pico Pilot Plant | Open Energy Information  

Open Energy Info (EERE)

European Pico Pilot Plant European Pico Pilot Plant < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage European Pico Pilot Plant.jpg Technology Profile Primary Organization Wave Energy Centre Project(s) where this technology is utilized *MHK Projects/OWC Pico Power Plant Technology Resource Click here Wave Technology Type Click here Oscillating Water Column Technology Readiness Level Click here TRL 4: Proof of Concept Technology Description A bottom mounted shoreline oscillating water column structure equipped with a horizontal axis Wells turbine generator set and a guide vane stator installed on each side of the rotor Control options are facilitated by a relief valve presently a slow acting valve with plans to substitute a fast acting mechanism in the wave chamber

212

Marsh Road Power Plant Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Marsh Road Power Plant Biomass Facility Marsh Road Power Plant Biomass Facility Jump to: navigation, search Name Marsh Road Power Plant Biomass Facility Facility Marsh Road Power Plant Sector Biomass Facility Type Landfill Gas Location San Mateo County, California Coordinates 37.4337342°, -122.4014193° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.4337342,"lon":-122.4014193,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

213

Blue Lake Plant Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Blue Lake Plant Biomass Facility Blue Lake Plant Biomass Facility Jump to: navigation, search Name Blue Lake Plant Biomass Facility Facility Blue Lake Plant Sector Biomass Location Blue Lake, California Coordinates 40.8829072°, -123.9839488° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.8829072,"lon":-123.9839488,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

214

West Point Treatment Plant Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Point Treatment Plant Biomass Facility Point Treatment Plant Biomass Facility Jump to: navigation, search Name West Point Treatment Plant Biomass Facility Facility West Point Treatment Plant Sector Biomass Facility Type Non-Fossil Waste Location King County, Washington Coordinates 47.5480339°, -121.9836029° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.5480339,"lon":-121.9836029,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

215

Coyote Canyon Steam Plant Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Steam Plant Biomass Facility Steam Plant Biomass Facility Jump to: navigation, search Name Coyote Canyon Steam Plant Biomass Facility Facility Coyote Canyon Steam Plant Sector Biomass Facility Type Landfill Gas Location Orange County, California Coordinates 33.7174708°, -117.8311428° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.7174708,"lon":-117.8311428,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

216

Sauder Power Plant Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Sauder Power Plant Biomass Facility Sauder Power Plant Biomass Facility Jump to: navigation, search Name Sauder Power Plant Biomass Facility Facility Sauder Power Plant Sector Biomass Location Fulton County, Ohio Coordinates 41.5719341°, -84.1435136° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.5719341,"lon":-84.1435136,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

217

Stowe Power Production Plant Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Stowe Power Production Plant Biomass Facility Stowe Power Production Plant Biomass Facility Jump to: navigation, search Name Stowe Power Production Plant Biomass Facility Facility Stowe Power Production Plant Sector Biomass Facility Type Landfill Gas Location Montgomery County, Pennsylvania Coordinates 40.2290075°, -75.3878525° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.2290075,"lon":-75.3878525,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

218

City Water and Light Plant | Open Energy Information  

Open Energy Info (EERE)

and Light Plant and Light Plant Jump to: navigation, search Name City Water and Light Plant Place Arkansas Utility Id 9879 Utility Location Yes Ownership M NERC Location SPP NERC SPP Yes RTO SPP Yes Operates Generating Plant Yes Activity Generation Yes Activity Buying Transmission Yes Activity Distribution Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png General Service- Large Industrial General Service- Large(Primary Metering) Industrial General Service- Small Electric Rate Commercial General service (Residential Electric Rate) Residential

219

Poly Plant Project Inc PPP | Open Energy Information  

Open Energy Info (EERE)

Poly Plant Project Inc PPP Poly Plant Project Inc PPP Jump to: navigation, search Name Poly Plant Project Inc (PPP) Place Burbank, California Zip 91502 Product US-based consultants to companies building or maintaining polysilicon production plants. Coordinates 46.202032°, -119.002405° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.202032,"lon":-119.002405,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

220

Rhodia Houston Plant Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Rhodia Houston Plant Biomass Facility Rhodia Houston Plant Biomass Facility Jump to: navigation, search Name Rhodia Houston Plant Biomass Facility Facility Rhodia Houston Plant Sector Biomass Facility Type Non-Fossil Waste Location Harris County, Texas Coordinates 29.7751825°, -95.3102505° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":29.7751825,"lon":-95.3102505,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "information plant assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Assessment of Air Preheater Effects on Power Plant Efficiency  

Science Conference Proceedings (OSTI)

Air Preheaters (APHs) improve overall boiler efficiency by transferring heat from the boiler exhaust gases to the incoming air used for combustion and coal drying. APH performance can have a significant impact on plant efficiency, and therefore fuel consumption, carbon dioxide (CO2) emissions and power plant economics. This report summarizes the major relationship between APH parameters and heat rate, and presents some preliminary guidelines for evaluating APH upgrades.

2008-12-17T23:59:59.000Z

222

PROBABILISTIC SAFETY ASSESSMENT OF OPERATIONAL ACCIDENTS AT THE WASTE ISOLATION PILOT PLANT  

Science Conference Proceedings (OSTI)

This report presents a probabilistic safety assessment of radioactive doses as consequences from accident scenarios to complement the deterministic assessment presented in the Waste Isolation Pilot Plant (WIPP) Safety Analysis Report (SAR). The International Council of Radiation Protection (ICRP) recommends both assessments be conducted to ensure that ''an adequate level of safety has been achieved and that no major contributors to risk are overlooked'' (ICRP 1993). To that end, the probabilistic assessment for the WIPP accident scenarios addresses the wide range of assumptions, e.g. the range of values representing the radioactive source of an accident, that could possibly have been overlooked by the SAR. Routine releases of radionuclides from the WIPP repository to the environment during the waste emplacement operations are expected to be essentially zero. In contrast, potential accidental releases from postulated accident scenarios during waste handling and emplacement could be substantial, which necessitates the need for radiological air monitoring and confinement barriers (DOE 1999). The WIPP Safety Analysis Report (SAR) calculated doses from accidental releases to the on-site (at 100 m from the source) and off-site (at the Exclusive Use Boundary and Site Boundary) public by a deterministic approach. This approach, as demonstrated in the SAR, uses single-point values of key parameters to assess the 50-year, whole-body committed effective dose equivalent (CEDE). The basic assumptions used in the SAR to formulate the CEDE are retained for this report's probabilistic assessment. However, for the probabilistic assessment, single-point parameter values were replaced with probability density functions (PDF) and were sampled over an expected range. Monte Carlo simulations were run, in which 10,000 iterations were performed by randomly selecting one value for each parameter and calculating the dose. Statistical information was then derived from the 10,000 iteration batch, which included 5%, 50%, and 95% dose likelihood, and the sensitivity of each assumption to the calculated doses. As one would intuitively expect, the doses from the probabilistic assessment for most scenarios were found to be much less than the deterministic assessment. The lower dose of the probabilistic assessment can be attributed to a ''smearing'' of values from the high and low end of the PDF spectrum of the various input parameters. The analysis also found a potential weakness in the deterministic analysis used in the SAR, a detail on drum loading was not taken into consideration. Waste emplacement operations thus far have handled drums from each shipment as a single unit, i.e. drums from each shipment are kept together. Shipments typically come from a single waste stream, and therefore the curie loading of each drum can be considered nearly identical to that of its neighbor. Calculations show that if there are large numbers of drums used in the accident scenario assessment, e.g. 28 drums in the waste hoist failure scenario (CH5), then the probabilistic dose assessment calculations will diverge from the deterministically determined doses. As it is currently calculated, the deterministic dose assessment assumes one drum loaded to the maximum allowable (80 PE-Ci), and the remaining are 10% of the maximum. The effective average of drum curie content is therefore less in the deterministic assessment than the probabilistic assessment for a large number of drums. EEG recommends that the WIPP SAR calculations be revisited and updated to include a probabilistic safety assessment.

Rucker, D.F.

2000-09-01T23:59:59.000Z

223

Map of Solar Power Plants/Data | Open Energy Information  

Open Energy Info (EERE)

Solar Power Plants/Data Solar Power Plants/Data < Map of Solar Power Plants Jump to: navigation, search Download a CSV file of the table below: CSV FacilityType Owner Developer EnergyPurchaser Place GeneratingCapacity NumberOfUnits CommercialOnlineDate HeatRate WindTurbineManufacturer FacilityStatus AV Solar Ranch I Solar Power Plant Photovoltaics NextLight Renewable Power Antelope Valley, California 230 MW230,000 kW 230,000,000 W 230,000,000,000 mW 0.23 GW 2.3e-4 TW Agua Caliente Solar Power Plant Photovoltaics NextLight Renewable Power Yuma County, Arizona 280 MW280,000 kW 280,000,000 W 280,000,000,000 mW 0.28 GW 2.8e-4 TW Agua Caliente Solar Project Utility scale solar First Solar Yuma County, Arizona 290 MW290,000 kW 290,000,000 W 290,000,000,000 mW

224

Environmental assessment and finding of no significant impact: Biorecycling Technologies, Inc., Noble Biogas and Fertilizer Plant, Fresno County, California  

DOE Green Energy (OSTI)

The US Department of Energy (DOE) is considering a proposal from the California Energy Commission for partial funding up to $1,500,000 of the construction of the biorecycling Technologies, Inc., (BTI) Noble Biogas and Fertilizer Plant in Fresno County, California. BTI along with its contractors and business partners would develop the plant, which would use manure and green waste to produce biogas and a variety of organic fertilizer products. The California Energy Commission has requested funding from the DOE Commercialization Ventures program to assist in the construction of the plant, which would produce up to one megawatt of electricity by burning biogas in a cogeneration unit. The purpose of this environmental assessment (EA) is to provide DOE and the public with information on potential environmental impacts associated with funding development of the proposed project.

NONE

1997-09-01T23:59:59.000Z

225

Niland Solar Farm LLC Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Niland Solar Farm LLC Solar Power Plant Niland Solar Farm LLC Solar Power Plant Jump to: navigation, search Name Niland Solar Farm LLC Solar Power Plant Facility Niland Solar Farm LLC Sector Solar Facility Type Photovoltaic Developer First Solar Location Niland, California Coordinates 33.2400366°, -115.5188756° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.2400366,"lon":-115.5188756,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

226

Carrizo Energy Solar Farm Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Carrizo Energy Solar Farm Solar Power Plant Carrizo Energy Solar Farm Solar Power Plant Jump to: navigation, search Name Carrizo Energy Solar Farm Solar Power Plant Facility Carrizo Energy Solar Farm Sector Solar Facility Type Concentrating Solar Power Developer Ausra CA II Location Carizzo Plain, California Coordinates 35.1913858°, -119.7260983° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.1913858,"lon":-119.7260983,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

227

Palmdale Project Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Palmdale Project Solar Power Plant Palmdale Project Solar Power Plant Jump to: navigation, search Name Palmdale Project Solar Power Plant Facility Palmdale Project Sector Solar Facility Type Hybrid Developer Inland Energy Location Palmdale, California Coordinates 34.5794343°, -118.1164613° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.5794343,"lon":-118.1164613,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

228

Sunset Reservoir Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Reservoir Solar Power Plant Reservoir Solar Power Plant Jump to: navigation, search Name Sunset Reservoir Solar Power Plant Facility Sunset Reservoir Sector Solar Facility Type Photovoltaic Developer Recurrent Energy Location San Francisco, California Coordinates 37.7749295°, -122.4194155° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.7749295,"lon":-122.4194155,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

229

Atlantic City Convention Center Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Convention Center Solar Power Plant Convention Center Solar Power Plant Jump to: navigation, search Name Atlantic City Convention Center Solar Power Plant Facility Atlantic City Convention Center Sector Solar Facility Type Photovoltaic Developer Pepco Energy Services Location Atlantic City, New Jersey Coordinates 39.3642834°, -74.4229266° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.3642834,"lon":-74.4229266,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

230

Beacon Solar Energy Project Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Solar Power Plant Solar Power Plant Jump to: navigation, search Name Beacon Solar Energy Project Solar Power Plant Facility Beacon Solar Energy Project Sector Solar Facility Type Concentrating Solar Power Developer NextEra Energy Location Kern County, California Coordinates 35.4937274°, -118.8596804° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.4937274,"lon":-118.8596804,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

231

Emcore/SunPeak Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Emcore/SunPeak Solar Power Plant Emcore/SunPeak Solar Power Plant < Emcore Jump to: navigation, search Name Emcore/SunPeak Solar Power Plant Facility Emcore/SunPeak Sector Solar Facility Type Concentrating Photovoltaic Developer SunPeak Solar Location Albuquerque, New Mexico Coordinates 35.0844909°, -106.6511367° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.0844909,"lon":-106.6511367,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

232

High Plains Ranch Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

High Plains Ranch Solar Power Plant High Plains Ranch Solar Power Plant Jump to: navigation, search Name High Plains Ranch Solar Power Plant Facility High Plains Ranch Sector Solar Facility Type Photovoltaic Developer Sun Power Location Carizzo Plain, California Coordinates 35.1913858°, -119.7260983° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.1913858,"lon":-119.7260983,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

233

Desert Sunlight Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Sunlight Solar Power Plant Sunlight Solar Power Plant Jump to: navigation, search Name Desert Sunlight Solar Power Plant Facility Desert Sunlight Sector Solar Facility Type Photovoltaic Developer First Solar Location Desert Center, California Coordinates 33.7541038°, -115.3311778° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.7541038,"lon":-115.3311778,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

234

Podolsky Chemical and Metallurgical Plant PCMP | Open Energy Information  

Open Energy Info (EERE)

Podolsky Chemical and Metallurgical Plant PCMP Podolsky Chemical and Metallurgical Plant PCMP Jump to: navigation, search Name Podolsky Chemical and Metallurgical Plant (PCMP) Place Moscow, Russian Federation Zip 142103 Sector Solar Product Russian manufacturer of monocrystalline silicon ingots, wafers, cells and quartz crucibles; serves both solar and semiconductor industries. Coordinates 55.75695°, 37.614975° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":55.75695,"lon":37.614975,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

235

Nellis AFB Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Nellis AFB Solar Power Plant Nellis AFB Solar Power Plant Jump to: navigation, search Name Nellis AFB Solar Power Plant Facility Nellis AFB Sector Solar Facility Type Photovoltaic Developer Fotowatio Renewable Ventures Location Clark County, Nevada Coordinates 36.0795613°, -115.094045° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.0795613,"lon":-115.094045,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

236

SEGS IV Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Solar Power Plant Solar Power Plant Jump to: navigation, search Name SEGS IV Solar Power Plant Facility SEGS IV Sector Solar Facility Type Concentrating Solar Power Developer Luz Location Kramer Junction, California Coordinates 34.9925°, -117.540833° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.9925,"lon":-117.540833,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

237

Searchlight Solar I Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Searchlight Solar I Solar Power Plant Searchlight Solar I Solar Power Plant Jump to: navigation, search Name Searchlight Solar I Solar Power Plant Facility Searchlight Solar I Sector Solar Facility Type Photovoltaic Developer American Capital Energy Location Searchlight, Nevada Coordinates 35.48428°, -114.937° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.48428,"lon":-114.937,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

238

Don Ana Sun Tower Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Don Ana Sun Tower Solar Power Plant Don Ana Sun Tower Solar Power Plant Jump to: navigation, search Name Don Ana Sun Tower Solar Power Plant Facility Don Ana Sun Tower Sector Solar Facility Type Concentrating Solar Power Developer NRG Energy/eSolar Location Dona Ana County, New Mexico Coordinates 32.485767°, -106.7234639° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.485767,"lon":-106.7234639,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

239

Alpine SunTower Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

SunTower Solar Power Plant SunTower Solar Power Plant Jump to: navigation, search Name Alpine SunTower Solar Power Plant Facility Alpine SunTower Sector Solar Facility Type Concentrating Solar Power Developer NRG Energy/eSolar Location Lancaster, California Coordinates 34.6867846°, -118.1541632° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.6867846,"lon":-118.1541632,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

240

Solaren Space Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Solaren Space Solar Power Plant Solaren Space Solar Power Plant Jump to: navigation, search Name Solaren Space Solar Power Plant Facility Solaren Space Solar Sector Solar Facility Type Photovoltaic Developer Solaren Corp Generating Capacity (MW) 200.0200 MW 200,000 kW 200,000,000 W 200,000,000,000 mW 0.2 GW References [1] Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

Note: This page contains sample records for the topic "information plant assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

SES Solar Two Project Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Project Solar Power Plant Project Solar Power Plant Jump to: navigation, search Name SES Solar Two Project Solar Power Plant Facility SES Solar Two Project Sector Solar Facility Type Concentrating Solar Power Developer Stirling Energy Systems, Tessera Solar Location Imperial Valley, California Coordinates 33.03743°, -115.621591° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.03743,"lon":-115.621591,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

242

SEGS VIII Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

VIII Solar Power Plant VIII Solar Power Plant Jump to: navigation, search Name SEGS VIII Solar Power Plant Facility SEGS VIII Sector Solar Facility Type Concentrating Solar Power Developer Luz Location Harper Lake, California Coordinates 35.0305°, -117.29° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.0305,"lon":-117.29,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

243

Solar Millenium Ridgecrest Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Ridgecrest Solar Power Plant Ridgecrest Solar Power Plant Jump to: navigation, search Name Solar Millenium Ridgecrest Solar Power Plant Facility Solar Millenium Ridgecrest Sector Solar Facility Type Concentrating Solar Power Developer Solar Millenium, LLC Location Ridgecrest, California Coordinates 35.6224561°, -117.6708966° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.6224561,"lon":-117.6708966,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

244

GV1 Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

GV1 Solar Power Plant GV1 Solar Power Plant Jump to: navigation, search Name GV1 Solar Power Plant Facility GV1 Sector Solar Facility Type Concentrating Solar Power Developer Greenvolts Location Tracy, California Coordinates 37.7396513°, -121.4252227° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.7396513,"lon":-121.4252227,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

245

SEGS VI Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

SEGS VI Solar Power Plant SEGS VI Solar Power Plant Jump to: navigation, search Name SEGS VI Solar Power Plant Facility SEGS VI Sector Solar Facility Type Concentrating Solar Power Developer Luz Location Kramer Junction, California Coordinates 34.9925°, -117.540833° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.9925,"lon":-117.540833,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

246

Tonopah Airport Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Tonopah Airport Solar Power Plant Tonopah Airport Solar Power Plant Jump to: navigation, search Name Tonopah Airport Solar Power Plant Facility Tonopah Airport Solar Sector Solar Facility Type Concentrating Solar Power Developer Solar Millenium, LLC Location Nye County, Nevada Coordinates 38.5807111°, -116.0413889° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.5807111,"lon":-116.0413889,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

247

SCE Roof Project Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

SCE Roof Project Solar Power Plant SCE Roof Project Solar Power Plant Jump to: navigation, search Name SCE Roof Project Solar Power Plant Facility SCE Roof Project Sector Solar Facility Type Photovoltaic Developer First Solar Location California Coordinates 36.778261°, -119.4179324° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.778261,"lon":-119.4179324,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

248

Victorville 2 Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Victorville 2 Solar Power Plant Victorville 2 Solar Power Plant Jump to: navigation, search Name Victorville 2 Solar Power Plant Facility Victorville 2 Sector Solar Facility Type Hybrid Developer Inland Energy Location Victorville, California Coordinates 34.5361067°, -117.2911565° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.5361067,"lon":-117.2911565,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

249

Cimarron I Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

I Solar Power Plant I Solar Power Plant Jump to: navigation, search Name Cimarron I Solar Power Plant Facility Cimarron I Sector Solar Facility Type Photovoltaic Developer First Solar Location Colfax County, New Mexico Coordinates 36.5799757°, -104.4723301° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.5799757,"lon":-104.4723301,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

250

Agua Caliente Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Plant Plant Jump to: navigation, search Name Agua Caliente Solar Power Plant Facility Agua Caliente Solar Sector Solar Facility Type Photovoltaic Developer NextLight Renewable Power Location Yuma County, Arizona Coordinates 32.6527533°, -113.9536466° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.6527533,"lon":-113.9536466,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

251

Topaz Solar Farm Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Solar Power Plant Solar Power Plant Jump to: navigation, search Name Topaz Solar Farm Solar Power Plant Facility Topaz Solar Farm Sector Solar Facility Type Photovoltaic Developer OptiSolar Location San Luis Obispo County, California Coordinates 35.3102296°, -120.4357631° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.3102296,"lon":-120.4357631,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

252

Solar Millenium Palen Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Palen Solar Power Plant Palen Solar Power Plant Jump to: navigation, search Name Solar Millenium Palen Solar Power Plant Facility Solar Millenium Palen Sector Solar Facility Type Concentrating Solar Power Facility Status Proposed Owner BrightSource Developer Solar Millenium, LLC Location Palen, California Coordinates 33.695923°, -115.225468° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.695923,"lon":-115.225468,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

253

Golden Hills Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Hills Solar Power Plant Hills Solar Power Plant Jump to: navigation, search Name Golden Hills Solar Power Plant Facility Golden Hills Solar Sector Solar Facility Type Photovoltaic Developer PowerWorks Location Alameda County, California Coordinates 37.6016892°, -121.7195459° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.6016892,"lon":-121.7195459,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

254

MHK Projects/BioSTREAM Pilot Plant | Open Energy Information  

Open Energy Info (EERE)

BioSTREAM Pilot Plant BioSTREAM Pilot Plant < MHK Projects(Redirected from MHK Projects/bioSTREAM Pilot Plant) Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-39.9872,"lon":148.051,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

255

Starwood Solar I Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Starwood Solar I Solar Power Plant Starwood Solar I Solar Power Plant Jump to: navigation, search Name Starwood Solar I Solar Power Plant Facility Starwood Solar I Sector Solar Facility Type Concentrating Solar Power Developer Lockheed Martin/Starwood Energy Location Harquahala Valley, Arizona Coordinates 33.45729°, -113.1619359° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.45729,"lon":-113.1619359,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

256

Mojave Solar Park Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Solar Park Solar Power Plant Solar Park Solar Power Plant Jump to: navigation, search Name Mojave Solar Park Solar Power Plant Facility Mojave Solar Park Sector Solar Facility Type Concentrating Solar Power Developer Solel Location San Bernardino County, California Coordinates 34.9592083°, -116.419389° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.9592083,"lon":-116.419389,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

257

CalRENEW-1 Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

CalRENEW-1 Solar Power Plant CalRENEW-1 Solar Power Plant Jump to: navigation, search Name CalRENEW-1 Solar Power Plant Facility CalRENEW-1 Sector Solar Facility Type Photovoltaic Developer Cleantech America Location Fresno County, California Coordinates 36.9858984°, -119.2320784° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.9858984,"lon":-119.2320784,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

258

El Dorado Solar Project Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Dorado Solar Project Solar Power Plant Dorado Solar Project Solar Power Plant Jump to: navigation, search Name El Dorado Solar Project Solar Power Plant Facility El Dorado Solar Project Sector Solar Facility Type Photovoltaic Developer First Solar/Sempra Generation Location Boulder City, Nevada Coordinates 35.9785911°, -114.8324851° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.9785911,"lon":-114.8324851,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

259

SEGS IX Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

IX Solar Power Plant IX Solar Power Plant Jump to: navigation, search Name SEGS IX Solar Power Plant Facility SEGS IX Sector Solar Facility Type Concentrating Solar Power Developer Luz Location Harper Lake, California Coordinates 35.0305°, -117.29° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.0305,"lon":-117.29,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

260

SES Solar Three Project Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Three Project Solar Power Plant Three Project Solar Power Plant Jump to: navigation, search Name SES Solar Three Project Solar Power Plant Facility SES Solar Three Project Sector Solar Facility Type Photovoltaics Facility Status Proposed Developer Stirling Energy Systems, Tessera Solar Location San Bernardino County, California Coordinates 34.9592083°, -116.419389° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.9592083,"lon":-116.419389,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "information plant assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

AV Solar Ranch I Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

AV Solar Ranch I Solar Power Plant AV Solar Ranch I Solar Power Plant Jump to: navigation, search Name AV Solar Ranch I Solar Power Plant Facility AV Solar Ranch I Sector Solar Facility Type Photovoltaic Developer NextLight Renewable Power Location Antelope Valley, California Coordinates 38.70833°, -121.32889° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.70833,"lon":-121.32889,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

262

Organizational analysis and safety for utilities with nuclear power plants: perspectives for organizational assessment. Volume 2. [PWR; BWR  

SciTech Connect

This two-volume report presents the results of initial research on the feasibility of applying organizational factors in nuclear power plant (NPP) safety assessment. Volume 1 of this report contains an overview of the literature, a discussion of available safety indicators, and a series of recommendations for more systematically incorporating organizational analysis into investigations of nuclear power plant safety. The six chapters of this volume discuss the major elements in our general approach to safety in the nuclear industry. The chapters include information on organizational design and safety; organizational governance; utility environment and safety related outcomes; assessments by selected federal agencies; review of data sources in the nuclear power industry; and existing safety indicators.

Osborn, R.N.; Olson, J.; Sommers, P.E.; McLaughlin, S.D.; Jackson, M.S.; Nadel, M.V.; Scott, W.G.; Connor, P.E.; Kerwin, N.; Kennedy, J.K. Jr.

1983-08-01T23:59:59.000Z

263

Energy Program Assessment Matrix | ENERGY STAR Buildings & Plants  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Assessment Matrix Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction...

264

Map of Solar Power Plants | Open Energy Information  

Open Energy Info (EERE)

Map of Solar Power Plants Map of Solar Power Plants Jump to: navigation, search Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":2500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026 further results","default":"","geoservice":"google","zoom":false,"width":"100%","height":"550px","centre":false,"layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":true,"searchmarkers":"","icon":"File:Sun

265

Processing on Information Fusion of Weak Electrical Signals in Plants  

Science Conference Proceedings (OSTI)

Information transmission of weak electrical signals in Bellis perennis was inosculated by a touching test system of self-made double shields with platinum sensors. Tested data of electrical signals denoised by the wavelet soft threshold and using Gaussian ... Keywords: intelligent control, information fusion, RBF neural networks, wavelet soft threshold denoising, weak electrical signal, Bellis perennis

Lanzhou Wang; Jinli Ding

2010-06-01T23:59:59.000Z

266

Use of Modern Digital, Information, and Communication Technologies for Nuclear Power Plant Maintenance Activities  

Science Conference Proceedings (OSTI)

The use of modern digital, information, and communications technology (DT, IT, and CT)) capabilities provides tremendous opportunities for developing beneficial applications for improving plant and human performance in operating plants, including opportunities for replacing aging and obsolete functionality and for providing new support applications. These capabilities can also provide improved functionality that will support the high expectations for the performance of new plants. The Electric Power Rese...

2011-06-21T23:59:59.000Z

267

Assessment of Nuclear Safety Culture at the Pantex Plant, November 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pantex Plant Pantex Plant May 2011 November 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Independent Oversight Assessment of Nuclear Safety Culture at the Pantex Plant Table of Contents 1.0 Introduction........................................................................................................................................... 1 2.0 Scope and Methodology ....................................................................................................................... 2 3.0 Results and Conclusions ....................................................................................................................... 3 4.0 Recommendations................................................................................................................................. 5

268

Guidelines for Reduced Seismic Loads to Assess Temporary Conditions in Nuclear Power Plants  

Science Conference Proceedings (OSTI)

Utilities do not have uniform guidelines and criteria to treat plant temporary conditions (TCs) or planned changes to safety-related systems. Regulatory review and acceptance criteria and guidelines tend to be overly conservative, leading to costly measures. This report proposes a risk-informed procedure for evaluating TCs using reduced seismic loads and current licensing basis allowables that reduces plant operation and maintenance (O&M) costs, shortens plant outages, and reduces personnel radiation exp...

1998-09-10T23:59:59.000Z

269

Floating Power Plant A S FPP | Open Energy Information  

Open Energy Info (EERE)

Power Plant A S FPP Power Plant A S FPP Jump to: navigation, search Name Floating Power Plant A/S (FPP) Address Stenholtsvej 27 Place Fredensborg, Denmark Zip DK-3480 Sector Wind energy Product Fredensborg-based company commercialising developments in the wave and wind energy sectors. Poseidon is the company's core development being tested at the site of an existing Dong offshore wind plant. Phone number 45 3391 9120 Website http://www.poseidonorgan.com Coordinates 55.978295°, 12.402055° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":55.978295,"lon":12.402055,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

270

MHK Technologies/Sea Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Plant Plant < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage Technology Profile Technology Resource Click here Ocean Thermal Energy Conversion (OTEC) Technology Type Click here Closed-cycle Technology Description A stationary floating plant skims off a small percentage of the surface layer to use as the heat source. For the heat sink, the plant has a large diameter submerged pipe to pump up the heavier frigid water below. A small amount of heat is extracted from the warm water and a lesser amount is put into the cold water. The net difference in energy flow is turned into electricity and fresh water and/or fuels and other useful products. Electricity is transmitted to shore through an underwater cable.The warm surface ocean water is pumped to the boiler, which transfers heat to the working fluid, turning it into a high-pressure vapor. The turbine generator spins as the vapor rushes through it to reach the low-pressure condenser, which is cooled by the nearly freezing water brought up from the ocean depths. After condensing, the working fluid is sent back to the boiler to be reused and to repeat the cycle.

271

Meiden Plant and Engineering Construction Co Ltd | Open Energy Information  

Open Energy Info (EERE)

Meiden Plant and Engineering Construction Co Ltd Meiden Plant and Engineering Construction Co Ltd Jump to: navigation, search Name Meiden Plant and Engineering Construction Co Ltd Place Tokyo, Tokyo, Japan Zip 141-8616 Sector Hydro, Solar, Wind energy Product Meiden Plant and Engineering is a Meidensha Corp's affiliated company responsible for project management and construction of generation systems by solar, wind, microhydroelectric and cogeneration. Coordinates 35.670479°, 139.740921° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.670479,"lon":139.740921,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

272

MHK Technologies/Mulitpurpose OTEC Coastal Plant | Open Energy Information  

Open Energy Info (EERE)

Mulitpurpose OTEC Coastal Plant Mulitpurpose OTEC Coastal Plant < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage Mulitpurpose OTEC Coastal Plant.jpg Technology Profile Primary Organization Xenesy Inc Technology Resource Click here OTEC Technology Type Click here OTEC - Closed Cycle Technology Readiness Level Click here TRL 1 3 Discovery Concept Def Early Stage Dev Design Engineering Technology Description OTEC Ocean Thermal Energy Conversion is a unique technology to generate electric power by converting thermal energy accumulated in the ocean Mooring Configuration Floating structure similar to a semi submersible drill rig Connected to a shore station with an electric cable It is dynamically positioned but we may use light mooring depending on the specific location For the most part these plants will be in deep but still waters Because top side surface will be at a minimum there will be minimum wind load Currents in an area must be measured to depth so that the use of effluent water as a dynamic force and the need for thrusters will be determined

273

Pesticides Safely For more information on selection, planting, cultural  

E-Print Network (OSTI)

or improve crop quality while reducing the frequency of pesticide applications. Less frequent applications pesticides and regulatory controls on their use, worker protection laws that limit re-entry into crops fertilizers and chemical pesticides more effectively, reducing waste, producing healthier plants, and often

Liskiewicz, Maciej

274

Assessing the Value of Information and Communications Technology (ICT) Training  

E-Print Network (OSTI)

INFORMATION AND COMMUNICATIONS TECHNOLOGY (ICT) TRAININGInformation and Communications Technology (ICT) Training information and communication technologies (ICTs). Indeed,

Danziger, Jim; Jennings, JoAnne S.; Park, Sung Chul

1999-01-01T23:59:59.000Z

275

Defining resilience within a risk-informed assessment framework  

Science Conference Proceedings (OSTI)

The concept of resilience is the subject of considerable discussion in academic, business, and governmental circles. The United States Department of Homeland Security for one has emphasised the need to consider resilience in safeguarding critical infrastructure and key resources. The concept of resilience is complex, multidimensional, and defined differently by different stakeholders. The authors contend that there is a benefit in moving from discussing resilience as an abstraction to defining resilience as a measurable characteristic of a system. This paper proposes defining resilience measures using elements of a traditional risk assessment framework to help clarify the concept of resilience and as a way to provide non-traditional risk information. The authors show various, diverse dimensions of resilience can be quantitatively defined in a common risk assessment framework based on the concept of loss of service. This allows the comparison of options for improving the resilience of infrastructure and presents a means to perform cost-benefit analysis. This paper discusses definitions and key aspects of resilience, presents equations for the risk of loss of infrastructure function that incorporate four key aspects of resilience that could prevent or mitigate that loss, describes proposed resilience factor definitions based on those risk impacts, and provides an example that illustrates how resilience factors would be calculated using a hypothetical scenario.

Coles, Garill A.; Unwin, Stephen D.; Holter, Gregory M.; Bass, Robert B.; Dagle, Jeffery E.

2011-08-01T23:59:59.000Z

276

Assess your starting point | ENERGY STAR Buildings & Plants  

NLE Websites -- All DOE Office Websites (Extended Search)

Assess your starting point Assess your starting point Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In this section Learn the benefits Get started Read the ENERGY STAR Guidelines for Energy Management Get buy-in from leadership and staff Make a commitment Assess your starting point Use Portfolio Manager Save energy Find financing Earn recognition Communicate your success

277

Historical Exposures to Chemicals at the Rocky Flats Nuclear Weapons Plant: A Pilot Retrospective Exposure Assessment  

SciTech Connect

In a mortality study of white males who had worked at the Rocky Flats Nuclear Weapons Plant between 1952 and 1979, an increased number of deaths from benign and unspecified intracranial neoplasms was found. A case-control study nested within this cohort investigated the hypothesis that an association existed between brain tumor death and exposure to either internally deposited plutonium or external ionizing radiation. There was no statistically significant association found between estimated radiation exposure from internally deposited plutonium and the development of brain tumors. Exposure by job or work area showed no significant difference between the cohort and the control groups. An update of the study found elevated risk estimates for (1) all lymphopoietic neoplasms, and (2) all causes of death in employees with body burdens greater than or equal to two nanocuries of plutonium. There was an excess of brain tumors for the entire cohort. Similar cohort studies conducted on worker populations from other plutonium handling facilities have not yet shown any elevated risks for brain tumors. Historically, the Rocky Flats Nuclear Weapons Plant used large quantities of chemicals in their production operations. The use of solvents, particularly carbon tetrachloride, was unique to Rocky Flats. No investigation of the possible confounding effects of chemical exposures was done in the initial studies. The objectives of the present study are to (1) investigate the history of chemical use at the Rocky Flats facility; (2) locate and analyze chemical monitoring information in order to assess employee exposure to the chemicals that were used in the highest volume; and (3) determine the feasibility of establishing a chemical exposure assessment model that could be used in future epidemiology studies.

Janeen Denise Robertson

1999-02-01T23:59:59.000Z

278

Finding of No Significant Impact and Final Environmental Assessment for the Y-12 Steam Plant Life Extenstion Project - Steam Plant Replacement Subproject  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

93 93 Finding of No Significant Impact and Final Environmental Assessment for the Y-12 Steam Plant Life Extension Project - Steam Plant Replacement Subproject U.S. Department of Energy Oak Ridge Y-12 Site Office National Nuclear Security Administration August 2007 DOE/EA-1593 Finding of No Significant Impact and Final Environmental Assessment for the Y-12 Steam Plant Life Extension Project - Steam Plant Replacement Subproject U.S. Department of Energy National Nuclear Security Administration

279

SEGS V Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

V Solar Power Plant V Solar Power Plant Facility SEGS V Sector Solar Facility Type Concentrating Solar Power Developer Luz Location Kramer Junction, California Coordinates 34.9925°, -117.540833° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.9925,"lon":-117.540833,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

280

SEGS III Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

III Solar Power Plant III Solar Power Plant Facility SEGS III Sector Solar Facility Type Concentrating Solar Power Facility Status In Service Owner NextEra Developer Luz Location Kramer Junction, California Coordinates 35.021632311687°, -117.56598472595° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.021632311687,"lon":-117.56598472595,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "information plant assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

MHK Projects/Cuttyhunk Tidal Energy Plant | Open Energy Information  

Open Energy Info (EERE)

Cuttyhunk Tidal Energy Plant Cuttyhunk Tidal Energy Plant < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.7778,"lon":-70.8489,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

282

MHK Projects/MORILD Demonstration Plant | Open Energy Information  

Open Energy Info (EERE)

MORILD Demonstration Plant MORILD Demonstration Plant < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":69.8079,"lon":18.6795,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

283

SEGS I Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

I Solar Power Plant I Solar Power Plant Facility SEGS I Sector Solar Facility Type Concentrating Solar Power Facility Status In Service Owner Cogentrix Developer Luz Location Daggett, California Coordinates 34.866479°, -116.825556° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.866479,"lon":-116.825556,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

284

American Canyon Power Plant Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Biomass Facility Biomass Facility Jump to: navigation, search Name American Canyon Power Plant Biomass Facility Facility American Canyon Power Plant Sector Biomass Facility Type Landfill Gas Location Napa County, California Coordinates 38.5024689°, -122.2653887° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.5024689,"lon":-122.2653887,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

285

MHK Projects/Pennamaquan Tidal Power Plant | Open Energy Information  

Open Energy Info (EERE)

Plant Plant < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.0051,"lon":-67.2259,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

286

SEGS II Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

II Solar Power Plant II Solar Power Plant Facility SEGS II Sector Solar Facility Type Concentrating Solar Power Facility Status In Service Owner Cogentrix Developer Luz Location Daggett, California Coordinates 34.862218°, -116.828012° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.862218,"lon":-116.828012,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

287

SEGS VII Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » SEGS VII Solar Power Plant Jump to: navigation, search Name SEGS VII Solar Power Plant Facility SEGS VII Sector Solar Facility Type Concentrating Solar Power Developer Luz Location Kramer Junction, California Coordinates 34.9925°, -117.540833° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.9925,"lon":-117.540833,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

288

MHK Projects/bioWAVE Pilot Plant | Open Energy Information  

Open Energy Info (EERE)

bioWAVE Pilot Plant bioWAVE Pilot Plant < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-37.8197,"lon":144.964,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

289

MHK Projects/Wiscasset Tidal Energy Plant | Open Energy Information  

Open Energy Info (EERE)

Wiscasset Tidal Energy Plant Wiscasset Tidal Energy Plant < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.8146,"lon":-69.8697,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

290

MHK Projects/Nantucket Tidal Energy Plant | Open Energy Information  

Open Energy Info (EERE)

Nantucket Tidal Energy Plant Nantucket Tidal Energy Plant < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.389,"lon":-70.5134,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

291

MHK Projects/Rockaway Tidal Energy Plant | Open Energy Information  

Open Energy Info (EERE)

Rockaway Tidal Energy Plant Rockaway Tidal Energy Plant < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.5667,"lon":-73.922,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

292

MHK Projects/BioSTREAM Pilot Plant | Open Energy Information  

Open Energy Info (EERE)

BioSTREAM Pilot Plant BioSTREAM Pilot Plant < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-39.9872,"lon":148.051,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

293

MHK Projects/Housatonic Tidal Energy Plant | Open Energy Information  

Open Energy Info (EERE)

Housatonic Tidal Energy Plant Housatonic Tidal Energy Plant < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.2713,"lon":-73.0883,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

294

Plant No 2 Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

No 2 Biomass Facility No 2 Biomass Facility Jump to: navigation, search Name Plant No 2 Biomass Facility Facility Plant No 2 Sector Biomass Facility Type Non-Fossil Waste Location Orange County, California Coordinates 33.7174708°, -117.8311428° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.7174708,"lon":-117.8311428,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

295

MHK Projects/Angoon Tidal Energy Plant | Open Energy Information  

Open Energy Info (EERE)

Angoon Tidal Energy Plant Angoon Tidal Energy Plant < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":57.5034,"lon":-134.58,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

296

MHK Projects/OWC Pico Power Plant | Open Energy Information  

Open Energy Info (EERE)

OWC Pico Power Plant OWC Pico Power Plant < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.5609,"lon":-28.4682,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

297

Draft Environmental Assessment Ormat Nevada Northern Nevada Geothermal Power Plant Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 FINAL ENVIRONMENTAL ASSESSMENT Ormat Nevada Northern Nevada Geothermal Power Plant Projects Department of Energy Loan Guarantee for ORMAT LLC's Tuscarora Geothermal Power Plant, Elko County, Nevada; Jersey Valley Geothermal Project, Pershing County, Nevada; and McGinness Hills Geothermal Project, Lander County, Nevada U.S. Department of Energy Loan Guarantee Program Office Washington, D.C. 20585 August 2011 NORTHERN NEVADA GEOTHERMAL POWER PLANT PROJECTS - ORMAT NEVADA AUGUST 2011 FINAL ENVIRONMENTAL ASSESSMENT i TABLE OF CONTENTS 1.0 INTRODUCTION.................................................................................................................1 1.1 SUMMARY AND LOCATION OF PROPOSED ACTION .....................................................1

298

Coolidge Petrosun Optimum Biodiesel Plant | Open Energy Information  

Open Energy Info (EERE)

Coolidge Petrosun Optimum Biodiesel Plant Coolidge Petrosun Optimum Biodiesel Plant Jump to: navigation, search Name Coolidge Petrosun/Optimum Biodiesel Plant Place Coolidge, Arizona Sector Biofuels Product Joint venture between PetroSun Biofuels (a wholly-owned subsidiary of PetroSun) and Optimum Biofuels, which was created for the specific purpose of this project. Coordinates 31.75442°, -96.649254° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":31.75442,"lon":-96.649254,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

299

Use of Level 3 PSA in Risk Informed, Performance Based Regulation of Nuclear Power Plants  

Science Conference Proceedings (OSTI)

At the request of the South Texas Electric Generating Station (STP), EPRI assessed the role of probabilistic safety assessment (PSA) Level 3 consequence analysis in the regulation of nuclear power plants. By surveying use of consequence analysis codes, their development, and current status, this report attempts to put Level 3 PSAs in perspective relative to their usefulness for making regulatory decisions.

1998-02-19T23:59:59.000Z

300

Nondestructive Evaluation: Probabilistic Risk Assessment Technical Adequacy Guidance for Risk-Informed In-Service Inspection Programs  

Science Conference Proceedings (OSTI)

Risk-informed methodologies have been developed in order to establish alternative in-service inspection (ISI) requirements that are defined as risk-informed in-service inspection (RI ISI) programs. Plant-specific probabilistic risk assessments (PRAs) are typically used during the RI ISI development process. The ASME PRA Standard (for example, ASME RA Sb 2005) and the U.S. Nuclear Regulatory Commission (NRC) Regulatory Guide (RG) 1.200 R1 and R2 have been issued and provide guidance in determining PRA tec...

2011-07-29T23:59:59.000Z

Note: This page contains sample records for the topic "information plant assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Assessment of Nonnative Invasive Plants in the DOE OR NERP  

NLE Websites -- All DOE Office Websites (Extended Search)

Available eledronically from the following source. Available eledronically from the following source. Web s/te: www.doe.gov/bridge Reports are available in paper to the public from the following source. US. Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 T-e: 1-800-553-6847 EM//: orders@ ntis.fedworld.gov Web site: www.ntis.gov/ordering.htm 7DD: 703-487-4639 Fa: 703-605-6900 Reports are available in paper to U.S. Department of Energy (DOE) employees, DOE contractors, Energy Technology Data Exchange (ETDE) representatives, and International Nuclear Information System (INIS) representatives from the following source. Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 37831 Telephone: 865-576-8401 €-ma//; reports0 adonis.osti .gov

302

Preliminary Feasibility Assessment of Geologic Carbon Sequestration Potential for TVA's John Sevier and Kingston Power Plants  

Science Conference Proceedings (OSTI)

This is a preliminary assessment of the potential for geologic carbon sequestration for the Tennessee Valley Authority's (TVA) John Sevier and Kingston power plants. The purpose of this assessment is to make a 'first cut' determination of whether there is sufficient potential for geologic carbon sequestration within 200 miles of the plants for TVA and Oak Ridge National Laboratory (ORNL) to proceed with a joint proposal for a larger project with a strong carbon management element. This assessment does not consider alternative technologies for carbon capture, but assumes the existence of a segregated CO{sub 2} stream suitable for sequestration.

Smith, Ellen D [ORNL; Saulsbury, Bo [ORNL

2008-03-01T23:59:59.000Z

303

NREL-Biomass Resource Assessment | Open Energy Information  

Open Energy Info (EERE)

NREL-Biomass Resource Assessment NREL-Biomass Resource Assessment (Redirected from Biomass Resource Assessment Presentation) Jump to: navigation, search Tool Summary Name: Biomass Resource Assessment Presentation Agency/Company /Organization: National Renewable Energy Laboratory Sector: Energy Focus Area: Biomass, Transportation Topics: Resource assessment Resource Type: Maps Website: www.nrel.gov/international/biomass_resource.html References: Biomass Resource Assessment at NREL (Int'l)[1] Logo: Biomass Resource Assessment Presentation Overview "Biomass resource assessments quantify the existing or potential biomass material in a given area. Biomass resources include agricultural crops and residues; dedicated energy crops; forestry products and residues; animal wastes; residues and byproducts from food, feed, fiber, wood, and materials

304

Assess business as usual (BAU) scenarios | Open Energy Information  

Open Energy Info (EERE)

for sector technologies Renewable Energy Technical Potential Toolkit Building Energy Assessment Toolkit Power System Screening and Design Toolkit Land Use Assessment...

305

Facility Energy Assessment Matrix | ENERGY STAR Buildings & Plants  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility Energy Assessment Matrix Facility Energy Assessment Matrix Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition Research and reports Service and product provider (SPP) resources Success stories Target Finder

306

Nevada Solar One Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » Nevada Solar One Solar Power Plant Jump to: navigation, search Name Nevada Solar One Solar Power Plant Facility Nevada Solar One Sector Solar Facility Type Concentrating Solar Power Facility Status In Service Developer Lauren Engineers & Constructors, Acciona Solar Power Inc. Location Boulder City, Nevada Coordinates 35.801003°, -114.976301° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.801003,"lon":-114.976301,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

307

Direct-flash-steam geothermal-power-plant assessment. Final report  

DOE Green Energy (OSTI)

The objective of the project was to analyze the capacity and availability factors of an operating direct flash geothermal power plant. The analysis was to include consideration of system and component specifications, operating procedures, maintenance history, malfunctions, and outage rate. The plant studied was the 75 MW(e) geothermal power plant at Cerro Prieto, Mexico, for the years 1973 to 1979. To describe and assess the plant, the project staff reviewed documents, visited the plant, and met with staff of the operating utility. The high reliability and availability of the plant was documented and actions responsible for the good performance were identified and reported. The results are useful as guidance to US utilities considering use of hot water geothermal resources for power generation through a direct flash conversion cycle.

Alt, T.E.

1982-01-01T23:59:59.000Z

308

Energy efficiency in municipal wastewater treatment plants: Technology assessment  

SciTech Connect

The New York State Energy Research and Development Authority (NYSERDA) estimates that municipal wastewater treatment plants (WWTPs) in New York State consume about 1.5 billion kWh of electricity each year for sewage treatment and sludge management based on the predominant types of treatment plants, the results of an energy use survey, and recent trends in the amounts of electricity WWTPs use nationwide. Electric utilities in New York State have encouraged demand-side management (DSM) to help control or lower energy costs and make energy available for new customers without constructing additional facilities. This report describes DSM opportunities for WWTPs in New York State; discusses the costs and benefits of several DSM measures; projects energy impact statewide of the DSM technologies; identifies the barrier to implementing DSM at WWTPs; and outlines one possible incentive that could stimulate widespread adoption of DSM by WWTP operators. The DSM technologies discussed are outfall hydropower, on-site generation, aeration efficiency, time-of-day electricity pricing, and storing wastewater.

1995-11-01T23:59:59.000Z

309

CDKN-Colombia-Cartagena Vulnerability Assessment | Open Energy Information  

Open Energy Info (EERE)

Cartagena Vulnerability Assessment Cartagena Vulnerability Assessment Jump to: navigation, search Name CDKN-Colombia-Cartagena Vulnerability Assessment Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development Sector Climate Topics Background analysis, Low emission development planning, Pathways analysis Website http://resilient-cities.iclei. Country Colombia UN Region South America References CDKN-Colombia-Cartagena Vulnerability Assessment[1] CDKN-Colombia-Cartagena Vulnerability Assessment Screenshot This article is a stub. You can help OpenEI by expanding it. References ↑ "CDKN-Colombia-Cartagena Vulnerability Assessment" Retrieved from "http://en.openei.org/w/index.php?title=CDKN-Colombia-Cartagena_Vulnerability_Assessment&oldid=407543

310

NREL-Biomass Resource Assessment | Open Energy Information  

Open Energy Info (EERE)

NREL-Biomass Resource Assessment NREL-Biomass Resource Assessment Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Biomass Resource Assessment Presentation Agency/Company /Organization: National Renewable Energy Laboratory Sector: Energy Focus Area: Biomass, Transportation Topics: Resource assessment Resource Type: Maps Website: www.nrel.gov/international/biomass_resource.html References: Biomass Resource Assessment at NREL (Int'l)[1] Logo: Biomass Resource Assessment Presentation Overview "Biomass resource assessments quantify the existing or potential biomass material in a given area. Biomass resources include agricultural crops and residues; dedicated energy crops; forestry products and residues; animal wastes; residues and byproducts from food, feed, fiber, wood, and materials

311

Assessment of inservice conditions of safety-related nuclear plant structures  

Science Conference Proceedings (OSTI)

The report is a compilation from a number of sources of information related to the condition Of structures and civil engineering features at operating nuclear power plants in the United States. The most significant information came from the hands-on inspection of the six old plants (licensed prior to 1977) performed by the staff of the Civil Engineering and Geosciences Branch (ECGB) in the Division of Engineering of the Office of Nuclear Reactor Regulation. For the containment structures, most of the information related to the degraded conditions came from the licensees as part of the Licensing Event Report System (10 CFR 50.73), or as part of the requirement under limiting condition of operation of the plant-specific Technical Specifications. Most of the information related to the degradation of other Structures and civil engineering features was extracted from the industry survey, the reported incidents, and the plant visits. The report discusses the condition of the structures and civil engineering features at operating nuclear power plants and provides information that would help detect, alleviate, and correct the degraded conditions of the structures and civil engineering features.

Ashar, H.; Bagchi, G.

1995-06-01T23:59:59.000Z

312

Liberia-NREL Biomass Resource Assessment | Open Energy Information  

Open Energy Info (EERE)

Liberia-NREL Biomass Resource Assessment Liberia-NREL Biomass Resource Assessment Jump to: navigation, search Logo: Liberia Biomass Resource Assessment Name Liberia Biomass Resource Assessment Agency/Company /Organization National Renewable Energy Laboratory Partner U.S. Agency for International Development Sector Energy Focus Area Biomass Topics Resource assessment, Background analysis Resource Type Dataset, Maps, Software/modeling tools Website http://www.nrel.gov/docs/fy09o Country Liberia Western Africa References Assessment of Biomass Resources in Liberia [1] Abstract This study was conducted to estimate the biomass resources currently and potentially available in the country and evaluate their contribution for power generation and the production of transportation fuels

313

Propane: A Mid-heating Season Assessment - U.S. Energy Information ...  

U.S. Energy Information Administration (EIA)

Propane - A Mid-Heating Season Assessment by David Hinton and Alice Lippert, Petroleum Division, Office of Oil and Gas, Energy Information Administration

314

Quantitatively assessing the vulnerability of critical information systems: A new method for evaluating security enhancements  

Science Conference Proceedings (OSTI)

This paper proposes a new approach for assessing the organization's vulnerability to information-security breaches. Although much research has been done on qualitative approaches, the literature on numerical approaches to quantify information-security ... Keywords: Information security, Information-security measurement, Risk analysis, Security threats, Vulnerability measurement

Sandip C. Patel; James H. Graham; Patricia A. S. Ralston

2008-12-01T23:59:59.000Z

315

NREL-Energy Assessment Training Course | Open Energy Information  

Open Energy Info (EERE)

NREL-Energy Assessment Training Course NREL-Energy Assessment Training Course (Redirected from NREL Energy Assessment Training Course) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: NREL Energy Assessment Training Course Agency/Company /Organization: National Renewable Energy Laboratory Sector: Energy Focus Area: Energy Efficiency, Buildings Resource Type: Training materials Website: prod-http-80-800498448.us-east-1.elb.amazonaws.com//w/images/7/76/Ener NREL Energy Assessment Training Course Screenshot References: Energy Assessment Training Course[1] Logo: NREL Energy Assessment Training Course Overview "The Energy Independence and Security Act (EISA) of 2007 states that energy managers shall complete a comprehensive energy and water assessment for each calendar year for approximately 25% of the [covered] facilities in a

316

Integrating gray system theory and logistic regression into case-based reasoning for safety assessment of thermal power plants  

Science Conference Proceedings (OSTI)

Safety assessment of thermal power plants (TPPs) is one of the important means to guarantee the safety of production in thermal power production enterprises. Due to various technical limitations, existing assessment approaches, such as analytic hierarchy ... Keywords: Case-based reasoning, Gray system theory, Intelligent decision support system, Logistic regression, Management safety assessment, Thermal power plants

Changyong Liang; Dongxiao Gu; Isabelle Bichindaritz; Xingguo Li; Chunrong Zuo; Wenen Cheng

2012-04-01T23:59:59.000Z

317

Soil-to-Plant Concentration Ratios for Assessing Food Chain Pathways in Biosphere Models  

SciTech Connect

This report describes work performed for the U.S. Nuclear Regulatory Commissions project Assessment of Food Chain Pathway Parameters in Biosphere Models, which was established to assess and evaluate a number of key parameters used in the food-chain models used in performance assessments of radioactive waste disposal facilities. Section 2 of this report summarizes characteristics of samples of soils and groundwater from three geographical regions of the United States, the Southeast, Northwest, and Southwest, and analyses performed to characterize their physical and chemical properties. Because the uptake and behavior of radionuclides in plant roots, plant leaves, and animal products depends on the chemistry of the water and soil coming in contact with plants and animals, water and soil samples collected from these regions of the United States were used in experiments at Pacific Northwest National Laboratory to determine radionuclide soil-to-plant concentration ratios. Crops and forage used in the experiments were grown in the soils, and long-lived radionuclides introduced into the groundwater provide the contaminated water used to water the grown plants. The radionuclides evaluated include 99Tc, 238Pu, and 241Am. Plant varieties include alfalfa, corn, onion, and potato. The radionuclide uptake results from this research study show how regional variations in water quality and soil chemistry affect radionuclide uptake. Section 3 summarizes the procedures and results of the uptake experiments, and relates the soil-to-plant uptake factors derived. In Section 4, the results found in this study are compared with similar values found in the biosphere modeling literature; the studys results are generally in line with current literature, but soil- and plant-specific differences are noticeable. This food-chain pathway data may be used by the NRC staff to assess dose to persons in the reference biosphere (e.g., persons who live and work in an area potentially affected by radionuclide releases) of waste disposal facilities and decommissioning sites.

Napier, Bruce A.; Fellows, Robert J.; Krupka, Kenneth M.

2007-10-01T23:59:59.000Z

318

Spent Fuel Pool Risk Assessment Integration Framework (Mark I and II BWRs) and Pilot Plant Application  

Science Conference Proceedings (OSTI)

This report documents the development and pilot application of a generic framework and methodology for conducting a probabilistic risk assessment (PRA) for spent fuel pools at BWR plants with Mark I or II containment designs. A key aspect of the study is the consideration of potential synergistic relationships between adverse conditions in the reactor and the spent fuel pool.BackgroundUsed nuclear fuel from the operation of nuclear power plants is typically ...

2013-05-01T23:59:59.000Z

319

South Bangkok combined cycle plant technical feasibility study. Export trade information  

SciTech Connect

The report, written by Black and Veatch International, was funded by the U.S. Trade and Development Agency on behalf of the Electricity Generating Authority of Thailand. It establishes the conceptual design for the installation of a 300 MW combined cycle unit at the South Bangkok Plant. It is divided into the following sections: Gas/Oil Resource Assessment; Water Resources Assessment; Bases of Design; Site Arrangement; Generation Plant Arrangement; Conceptual Design; Transmission System Integration; Capital and Operating Cost Estimate; and Project Implementation.

1990-07-01T23:59:59.000Z

320

Preliminary performance assessment for the Waste Isolation Pilot Plant, December 1992. Volume 2, Technical basis  

Science Conference Proceedings (OSTI)

Before disposing of transuranic radioactive waste in the Waste Isolation Pilot Plant (WIPP), the United States Department of Energy (DOE) must evaluate compliance with applicable long-term regulations of the United States Environmental Protection Agency (EPA). Sandia National Laboratories is conducting iterative performance assessments (PAs) of the WIPP for the DOE to provide interim guidance while preparing for a final compliance evaluation. This volume, Volume 2, contains the technical basis for the 1992 PA. Specifically, it describes the conceptual basis for consequence modeling and the PA methodology, including the selection of scenarios for analysis, the determination of scenario probabilities, and the estimation of scenario consequences using a Monte Carlo technique and a linked system of computational models. Additional information about the 1992 PA is provided in other volumes. Volume I contains an overview of WIPP PA and results of a preliminary comparison with the long-term requirements of the EPA`s Environmental Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes (40 CFR 191, Subpart B). Volume 3 contains the reference data base and values for input parameters used in consequence and probability modeling. Volume 4 contains uncertainty and sensitivity analyses related to the preliminary comparison with 40 CFR 191B. Volume 5 contains uncertainty and sensitivity analyses of gas and brine migration for undisturbed performance. Finally, guidance derived from the entire 1992 PA is presented in Volume 6.

Not Available

1992-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "information plant assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Lifecycle Assessments and Sustainability Analyses | Open Energy Information  

Open Energy Info (EERE)

Lifecycle Assessments and Sustainability Analyses Lifecycle Assessments and Sustainability Analyses Jump to: navigation, search The National Renewable Energy Laboratory performs lifecycle and technoeconomic analyses to promote sustainable energy development. Conducting full life-cycle assessments for biomass products, including electricity, biodiesel, and ethanol, is important for determining environmental benefits. NREL analysts use a life-cycle inventory modeling package and supporting databases to conduct life-cycle assessments. These tools can be applied on a global, regional, local, or project basis. Integrated system analyses, technoeconomic analyses, life-cycle assessments (LCAs), and other analysis tools are essential to our research and development efforts. They provide an understanding of the economic,

322

OSIRIS and SOMBRERO Inertial Fusion Power Plant Designs, Volume 2: Designs, Assessments, and Comparisons  

Science Conference Proceedings (OSTI)

This is a comprehensive design study of two Inertial Fusion Energy (IFE) electric power plants. Conceptual designs are presented for a fusion reactor (called Osiris) using an induction-linac heavy-ion beam driver, and another (called SOMBRERO) using a KrF laser driver. The designs covered all aspects of IFE power plants, including the chambers, heat transport and power conversion systems, balance-of-plant facilities, target fabrication, target injection and tracking, as well as the heavy-ion and KrF drivers. The point designs were assessed and compared in terms of their environmental & safety aspects, reliability and availability, economics, and technology development needs.

Meier, W. R.; Bieri, R. L.; Monsler, M. J.; Hendricks, C. D.; Laybourne, P.; Shillito, K. R.

1992-03-01T23:59:59.000Z

323

Algeria-DLR Resource Assessments | Open Energy Information  

Open Energy Info (EERE)

DLR Resource Assessments DLR Resource Assessments Jump to: navigation, search Name Algeria-DLR Resource Assessments Agency/Company /Organization German Aerospace Center (DLR) Sector Energy Focus Area Renewable Energy, Solar, Wind Topics Background analysis, Resource assessment Resource Type Software/modeling tools, Dataset, Maps Website http://www.dlr.de/en/ Program Start 2007 Program End 2008 Country Algeria Northern Africa References DLR Website [1] From 2007-2008 the German Aerospace Center (DLR) developed a collection of solar and wind resource assessments for Algeria. The key products included maps of existing ressource assessments, pre feasibility studies for CSP and wind projects. References ↑ "DLR Website" Retrieved from "http://en.openei.org/w/index.php?title=Algeria-DLR_Resource_Assessments&oldid=328383"

324

NREL-Energy Assessment Training Course | Open Energy Information  

Open Energy Info (EERE)

Energy Assessment Training Course Energy Assessment Training Course Jump to: navigation, search Tool Summary Name: NREL Energy Assessment Training Course Agency/Company /Organization: National Renewable Energy Laboratory Sector: Energy Focus Area: Energy Efficiency, Buildings Resource Type: Training materials Website: prod-http-80-800498448.us-east-1.elb.amazonaws.com//w/images/7/76/Ener NREL Energy Assessment Training Course Screenshot References: Energy Assessment Training Course[1] Logo: NREL Energy Assessment Training Course Overview "The Energy Independence and Security Act (EISA) of 2007 states that energy managers shall complete a comprehensive energy and water assessment for each calendar year for approximately 25% of the [covered] facilities in a manner that ensures that an evaluation of each such facility is completed

325

Jordan-DLR Resource Assessments | Open Energy Information  

Open Energy Info (EERE)

Jordan-DLR Resource Assessments Jordan-DLR Resource Assessments Jump to: navigation, search Name Jordan-DLR Resource Assessments Agency/Company /Organization German Aerospace Center (DLR) Sector Energy Focus Area Renewable Energy, Solar, Wind Topics Background analysis, Resource assessment Resource Type Software/modeling tools, Dataset, Maps Website http://www.dlr.de/en/ Program Start 2007 Program End 2008 Country Jordan Western Asia References DLR Website [1] From 2007-2008 the German Aerospace Center (DLR) developed a collection of solar and wind resource assessments for Tunisia. The key products included maps of existing resource assessments, pre feasibility studies for CSP and wind projects. References ↑ "DLR Website" Retrieved from "http://en.openei.org/w/index.php?title=Jordan-DLR_Resource_Assessments&oldid=328867"

326

Ethiopia-DLR Resource Assessments | Open Energy Information  

Open Energy Info (EERE)

Ethiopia-DLR Resource Assessments Ethiopia-DLR Resource Assessments Jump to: navigation, search Name Ethiopia-DLR Cooperation Agency/Company /Organization German Aerospace Center (DLR) Sector Energy Focus Area Renewable Energy Topics Background analysis, Resource assessment Resource Type Software/modeling tools, Dataset, Maps Website http://www.dlr.de/tt/desktopde Program Start 2001 Program End 2004 Country Ethiopia Eastern Africa References DLR-SWERA Resource Assessments[1] From 2001 to 2004 the German Aerospace Center (DLR) worked with Ethiopia on solar resource and GIS analysis as part of UNEP's Solar and Wind Energy Resource Assessment (SWERA) Programme. References ↑ "DLR-SWERA Resource Assessments" Retrieved from "http://en.openei.org/w/index.php?title=Ethiopia-DLR_Resource_Assessments&oldid=328651"

327

NREL-Wind Resource Assessment Handbook | Open Energy Information  

Open Energy Info (EERE)

Wind Resource Assessment Handbook Wind Resource Assessment Handbook Jump to: navigation, search Tool Summary LAUNCH TOOL Name: NREL-Wind Resource Assessment Handbook Agency/Company /Organization: National Renewable Energy Laboratory Sector: Energy Focus Area: Wind Topics: Resource assessment Resource Type: Guide/manual, Training materials Website: www.nrel.gov/docs/legosti/fy97/22223.pdf NREL-Wind Resource Assessment Handbook Screenshot References: Wind Resource Assessment Handbook[1] Logo: NREL-Wind Resource Assessment Handbook This handbook presents industry-accepted guidelines for planning and conducting a wind resource measurement program to support a wind energy feasibility initiative. About "This handbook presents industry-accepted guidelines for planning and conducting a wind resource measurement program to support a wind energy

328

Colombia-Cartagena Vulnerability Assessment | Open Energy Information  

Open Energy Info (EERE)

Colombia-Cartagena Vulnerability Assessment Colombia-Cartagena Vulnerability Assessment Jump to: navigation, search Name Colombia-CDKN-Cartagena Vulnerability Assessment Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development Sector Climate Topics Background analysis, Low emission development planning, Pathways analysis Website http://resilient-cities.iclei. Country Colombia UN Region South America References CDKN-Colombia-Cartagena Vulnerability Assessment[1] Colombia-CDKN-Cartagena Vulnerability Assessment Screenshot This article is a stub. You can help OpenEI by expanding it. References ↑ "CDKN-Colombia-Cartagena Vulnerability Assessment" Retrieved from "http://en.openei.org/w/index.php?title=Colombia-Cartagena_Vulnerability_Assessment&oldid=699760"

329

Stage 3b: Assessing Opportunities | Open Energy Information  

Open Energy Info (EERE)

b: Assessing Opportunities b: Assessing Opportunities Jump to: navigation, search Stage 3b LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities Develop_BAU Stage 4: Prioritizing and Planning for Actions Begin execution of implementation plans 1.0. Organizing the LEDS Process 1.1. Institutional Structure for LEDS 1.2. Workplan to Develop the LEDS 1.3. Roles and responsibilities to develop LEDS 2.1. Assess current country plans, policies, practices, and capacities 2.2. Compile lessons learned and good practices from ongoing and previous sustainable development efforts in the country 2.3. Assess public and private sector capacity to support initiatives 2.4. Assess and improve the national GHG inventory and other economic and resource data as needed for LEDS development

330

Financial and Cost Assessment Model (FICAM) | Open Energy Information  

Open Energy Info (EERE)

Financial and Cost Assessment Model (FICAM) Financial and Cost Assessment Model (FICAM) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Financial and Cost Assessment Model (FICAM) Agency/Company /Organization: UNEP-Risoe Centre Sector: Climate Focus Area: Greenhouse Gas Topics: Finance, Baseline projection, GHG inventory Resource Type: Software/modeling tools User Interface: Spreadsheet Website: tech-action.org/models.htm Cost: Free Financial and Cost Assessment Model (FICAM) Screenshot References: FICAM[1] "The Financial and Cost Assessment Model (FICAM) evaluates the contribution of technologies and practices towards mitigation of greenhouse gases, and carries a comprehensive financial analysis." References ↑ "FICAM" Retrieved from "http://en.openei.org/w/index.php?title=Financial_and_Cost_Assessment_Model_(FICAM)&oldid=383091"

331

China-DLR Resource Assessments | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » China-DLR Resource Assessments Jump to: navigation, search Name China-DLR Resource Assessments Agency/Company /Organization German Aerospace Center (DLR) Sector Energy Focus Area Renewable Energy Topics Background analysis, Resource assessment Resource Type Software/modeling tools, Dataset, Maps Website http://www.dlr.de/tt/desktopde Program Start 2001 Program End 2004 Country China Eastern Asia References DLR-SWERA Resource Assessments[1] From 2001 to 2004 the German Aerospace Center (DLR) worked with China on solar resource and GIS analysis as part of UNEP's Solar and Wind Energy Resource Assessment (SWERA) Programme. References ↑ "DLR-SWERA Resource Assessments" Retrieved from

332

En.lighten Country Lighting Assessments (CLAs) | Open Energy Information  

Open Energy Info (EERE)

En.lighten Country Lighting Assessments (CLAs) En.lighten Country Lighting Assessments (CLAs) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: En.lighten Country Lighting Assessments (CLAs) Agency/Company /Organization: United Nations Environment Programme Sector: Energy Focus Area: Energy Efficiency, Buildings Topics: Resource assessment Website: hqweb.enlighten-initiative.org/CountrySupport/CountryLightingAssessmen En.lighten Country Lighting Assessments (CLAs) Screenshot References: CLAs[1] Logo: En.lighten Country Lighting Assessments (CLAs) About "A large scale shift to efficient lighting is one of the most effective and economically advantageous means to combat climate change. In order to demonstrate the potential opportunities in terms of CO2 emissions reduction and financial economies to be realized by countries that adopt efficient

333

Sustainable Land-use Impact Assessment Toolkit | Open Energy Information  

Open Energy Info (EERE)

Sustainable Land-use Impact Assessment Toolkit Sustainable Land-use Impact Assessment Toolkit Jump to: navigation, search Stage 3 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities Develop_BAU Stage 4: Prioritizing and Planning for Actions Begin execution of implementation plans 1.0. Organizing the LEDS Process 1.1. Institutional Structure for LEDS 1.2. Workplan to Develop the LEDS 1.3. Roles and responsibilities to develop LEDS 2.1. Assess current country plans, policies, practices, and capacities 2.2. Compile lessons learned and good practices from ongoing and previous sustainable development efforts in the country 2.3. Assess public and private sector capacity to support initiatives 2.4. Assess and improve the national GHG inventory and other economic and resource data as needed for LEDS development

334

Program on Technology Innovation: Information Integration for Equipment Reliability at Nuclear Plants  

Science Conference Proceedings (OSTI)

This report investigates the status of information integration for equipment reliability (ER) at nuclear power plants. ER consists of a comprehensive set of processes that span the organization and require extensive data gathering, retrieval, and information integration. To assist nuclear operators, the Institute of Nuclear Power Operations (INPO) issued AP-913, Equipment Reliability Process Description, as a standard approach to implement effective ER processes among its members. Despite the success tha...

2009-04-30T23:59:59.000Z

335

Evaluating the Effects of Power Plants on Aquatic Communities: Guidelines for Selection of Assessment Methods  

Science Conference Proceedings (OSTI)

This report provides guidelines for selecting methods to estimate effects of cooling water withdrawals on aquatic populations and communities. The report is a companion to the EPRI 1999 report TR-112013, "Catalog of Assessment Methods for Evaluating Effects of Power Plant Operations on Aquatic Communities." These two documents describe approaches for estimating the magnitude of cooling water intake structure effects as part of assessing the potential for adverse environmental impact (AEI) under Section 3...

2002-05-24T23:59:59.000Z

336

Plant Engineering: Evaluation of Indirect Assessment Techniques for Coating Flaw Detection  

Science Conference Proceedings (OSTI)

This report is a description of the work performed and conclusions resulting from an investigation of indirect assessment techniques for coating flaw detection on buried piping in nuclear generating power plant environments. Indirect assessment techniques have been developed and successfully used in the oil and gas industry to identify coating flaws on buried transmission and distribution pipelines. These techniques involve the use of electrochemical measurements taken at the soil surface (grade) to dete...

2011-12-23T23:59:59.000Z

337

Tunisia-DLR Resource Assessments | Open Energy Information  

Open Energy Info (EERE)

key products included maps of existing resource assessments, pre feasibility studies for CSP and wind projects. References "DLR Website" Retrieved from "http:en.openei.orgw...

338

Solar and Wind Energy Resource Assessment (SWERA) | Open Energy Information  

Open Energy Info (EERE)

Energy Resource Assessment (SWERA) Energy Resource Assessment (SWERA) Jump to: navigation, search SWERA logo.png Solar and Wind Energy Resource Assessment (SWERA) Interactive Web PortalPowered by OpenEI Getting Started Data Sets Analysis Tools About SWERA Tool Summary LAUNCH TOOL Name: Solar and Wind Energy Resource Assessment Agency/Company /Organization: United Nations Environment Programme Partner: National Renewable Energy Laboratory, German Aerospace Center (DLR), Risoe National Laboratory for Sustainable Energy, Brazil's National Institute for Space Research (INPE), State University of New York (SUNY), Technical University of Denmark (DTU), United Nations Environment Programme (UNEP), National Aeronautics and Space Administration, Global Environment Facility (GEF) Sector: Energy Focus Area: Solar, Wind

339

UNEP Risoe Technology Needs Assessment Program | Open Energy Information  

Open Energy Info (EERE)

Needs Assessment Program Needs Assessment Program Jump to: navigation, search Name UNEP Risoe-Technology Needs Assessment Program Agency/Company /Organization UNEP-Risoe Centre Sector Energy Topics Background analysis, Low emission development planning, -Roadmap, Pathways analysis Website http://tech-action.org/ Country Argentina, Bangladesh, Cambodia, Costa Rica, Georgia (country), Guatemala, Indonesia, Ivory Coast, Kenya, Mali, Morocco, Peru, Senegal, Thailand, Vietnam South America, Southern Asia, South-Eastern Asia, Central America, Western Asia, Central America, South-Eastern Asia, Western Africa, Eastern Africa, Western Africa, Northern Africa, South America, Western Africa, South-Eastern Asia, South-Eastern Asia References UNEP Risoe-Technology Needs Assessment Program[1]

340

GRR/Section 11 - Cultural Resource Assessment | Open Energy Information  

Open Energy Info (EERE)

- Cultural Resource Assessment - Cultural Resource Assessment < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 11 - Cultural Resource Assessment 11CulturalResourceAssessment (1).pdf Click to View Fullscreen Contact Agencies Advisory Council on Historic Preservation National Park Service Bureau of Land Management United States Department of Interior Bureau of Indian Affairs Regulations & Policies National Historic Preservation Act (NHPA) - specifically, Section 106 36 CFR 800 - Protection of Historic Properties Native American Graves Protection Act Archaeological and Historic Preservation Act Archaeological Resource Protection Act American Indian Religious Freedom Act Paleontological Resources Preservation Act Federal Cave Resources Protection Act

Note: This page contains sample records for the topic "information plant assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

ProgramTopics Resource assessment | Open Energy Information  

Open Energy Info (EERE)

Assessments + BioPower Atlas and BioFuels Atlas + Bioenergy KDF + Biomass Energy Data Book + Biomass Scenario Model + Building Component Library + CLIMWAT 2.0 + Previous Results...

342

Nepal-DLR Resource Assessments | Open Energy Information  

Open Energy Info (EERE)

analysis, Resource assessment Resource Type Softwaremodeling tools, Dataset, Maps Website http:www.dlr.dettdesktopde Program Start 2001 Program End 2004 Country...

343

Bangladesh-DLR Resource Assessments | Open Energy Information  

Open Energy Info (EERE)

analysis, Resource assessment Resource Type Softwaremodeling tools, Dataset, Maps Website http:www.dlr.dettdesktopde Program Start 2001 Program End 2004 Country...

344

Ghana-DLR Resource Assessments | Open Energy Information  

Open Energy Info (EERE)

Energy, Solar Topics Resource assessment, Background analysis Resource Type Dataset, Maps, Softwaremodeling tools Website http:www.dlr.dettdesktopde Program Start 2001...

345

Geothermal Resources Assessment In Hawaii | Open Energy Information  

Open Energy Info (EERE)

Assessment In Hawaii Assessment In Hawaii Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Journal Article: Geothermal Resources Assessment In Hawaii Details Activities (78) Areas (14) Regions (0) Abstract: The Hawaii Geothermal Resources Assessment Program was initiated in 1978. The preliminary phase of this effort identified 20 Potential Geothermal Resource Areas (PGRAs) using available geological, geochemical and geophysical data. The second phase of the Assessment Program undertook a series of field studies, utilizing a variety of geothermal exploration techniques. A total of 15 PGRAs on four of the five major islands in the Hawaiian chain were subject to at least a preliminary field analysis. The results of these studies have allowed us to attempt an estimate of the

346

GRR/Section 14 - Water Resource Assessment | Open Energy Information  

Open Energy Info (EERE)

- Water Resource Assessment - Water Resource Assessment < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14 - Water Resource Assessment 14 - WaterResourceAssessment.pdf Click to View Fullscreen Contact Agencies United States Environmental Protection Agency Bureau of Land Management US Army Corps of Engineers Federal Emergency Management Agency Regulations & Policies Clean Water Act Coastal Zone Management Act Coastal Barrier Resources Act Safe Drinking Water Act Sole Source Aquifer Demonstration Program Flood Disaster Protection Act of 1973 NPDES Rules National Flood Insurance Act Flood Disaster Protection Act of 1973 Triggers None specified Click "Edit With Form" above to add content 14 - WaterResourceAssessment.pdf

347

Steam System Efficiency Optimized After J.R. Simplot Fertilizer Plant Receives Energy Assessment  

SciTech Connect

This case study describes how the J.R. Simplot company's Don Plant in Pocatello, Idaho, achieved annual savings of $335,000 and 75,000 MMBtu, with a simple payback of 6.5 months, after receiving a DOE Save Energy Now energy assessment.

2008-07-01T23:59:59.000Z

348

ORGAN PARTITIONING AND DISTRIBUTION ACROSS THE SEED PLANTS: ASSESSING THE RELATIVE IMPORTANCE OF PHYLOGENY AND FUNCTION  

E-Print Network (OSTI)

and Mathematics, Kenyon College, Gambier, Ohio 43022, U.S.A. Understanding how plant biomass is distributed, and ecosystem studies. Current ecological dogma states that patterns of biomass partitioning result from. In addition, the importance of evolutionary history in biomass distribution is unclear. Here, we assess

Kerkhoff, Andrew J.

349

Plant Component Assessment for Creep-Fatigue Damage: Component Assessment Methodologies  

Science Conference Proceedings (OSTI)

This report is part of an ongoing Electric Power Research Institute (EPRI) project to document the current state of knowledge and to address the creep-fatigue assessment of components. An international group of industry and academic experts led by EPRI has assessed and documented creep-fatigue evaluation, analytical and life prediction methodologies, and deficiencies in the current understanding and prediction of creep-fatigue damage. This led to the identification of issues for future research and devel...

2009-12-23T23:59:59.000Z

350

File:07IDAPowerPlantSitingConstruction.pdf | Open Energy Information  

Open Energy Info (EERE)

7IDAPowerPlantSitingConstruction.pdf 7IDAPowerPlantSitingConstruction.pdf Jump to: navigation, search File File history File usage File:07IDAPowerPlantSitingConstruction.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 25 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 08:21, 29 October 2012 Thumbnail for version as of 08:21, 29 October 2012 1,275 × 1,650 (25 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following page links to this file: GRR/Section 7-ID-a - Power Plant Siting

351

File:07AKAPowerPlantSitingConstruction.pdf | Open Energy Information  

Open Energy Info (EERE)

AKAPowerPlantSitingConstruction.pdf AKAPowerPlantSitingConstruction.pdf Jump to: navigation, search File File history File usage File:07AKAPowerPlantSitingConstruction.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 11 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 10:34, 18 October 2012 Thumbnail for version as of 10:34, 18 October 2012 1,275 × 1,650 (11 KB) Jnorris (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following page links to this file: GRR/Section 7-AK-a - Power Plant Siting and Construction

352

A VIKOR technique based on DEMATEL and ANP for information security risk control assessment  

Science Conference Proceedings (OSTI)

As companies and organizations have grown to rely on their computer systems and networks, the issue of information security management has become more significant. To maintain their competitiveness, enterprises should safeguard their information and ... Keywords: Analytic network process (ANP), DEMATEL, Information security, Multiple criteria decision making (MCDM), Risk control assessment, VIKOR

Yu-Ping Ou Yang; How-Ming Shieh; Gwo-Hshiung Tzeng

2013-05-01T23:59:59.000Z

353

Belize-OAS Cellulosic Ethanol Market Assessment | Open Energy Information  

Open Energy Info (EERE)

Belize-OAS Cellulosic Ethanol Market Assessment Belize-OAS Cellulosic Ethanol Market Assessment Jump to: navigation, search Name Belize-OAS Cellulosic Ethanol Market Assessment Agency/Company /Organization Organization of American States (OAS) Sector Energy Focus Area Renewable Energy, Biomass Topics Market analysis, Background analysis Website http://www.sepa-americas.net/p Program Start 2008 Program End 2009 Country Belize UN Region Latin America and the Caribbean References OAS Project Database[1] "The main objective of the Project is to assess the market potential for cellulosic ethanol in Belize through sustainable implementation of cellulosic ethanol technology utilizing agricultural and forest residues as primary biomass feedstock. A supplementary objective will be to help prepare for potential future cellulosic ethanol projects in other Caribbean

354

Hydrogen Demand and Resource Assessment Tool | Open Energy Information  

Open Energy Info (EERE)

Hydrogen Demand and Resource Assessment Tool Hydrogen Demand and Resource Assessment Tool Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Hydrogen Demand and Resource Assessment Tool Agency/Company /Organization: National Renewable Energy Laboratory Sector: Energy Focus Area: Hydrogen, Transportation Topics: Technology characterizations Resource Type: Dataset, Software/modeling tools User Interface: Website Website: maps.nrel.gov/ Web Application Link: maps.nrel.gov/hydra Cost: Free Language: English References: http://maps.nrel.gov/hydra Logo: Hydrogen Demand and Resource Assessment Tool Use HyDRA to view, download, and analyze hydrogen data spatially and dynamically. HyDRA provides access to hydrogen demand, resource, infrastructure, cost, production, and distribution data. A user account is

355

Property:NumberOfResourceAssessmentsEnergy | Open Energy Information  

Open Energy Info (EERE)

NumberOfResourceAssessmentsEnergy NumberOfResourceAssessmentsEnergy Jump to: navigation, search This is a property of type Number. Pages using the property "NumberOfResourceAssessmentsEnergy" Showing 25 pages using this property. (previous 25) (next 25) A Afghanistan + 1 + Albania + 0 + Algeria + 1 + Andorra + 0 + Angola + 0 + Anguilla + 0 + Antigua and Barbuda + 1 + Argentina + 0 + Armenia + 1 + Aruba + 0 + Australia + 3 + Austria + 0 + Azerbaijan + 0 + B Bahamas + 1 + Bahrain + 0 + Bangladesh + 1 + Barbados + 1 + Belarus + 0 + Belgium + 0 + Belize + 2 + Benin + 0 + Bermuda + 0 + Bhutan + 0 + Bolivia + 1 + Bosnia and Herzegovina + 0 + (previous 25) (next 25) Retrieved from "http://en.openei.org/w/index.php?title=Property:NumberOfResourceAssessmentsEnergy&oldid=314431

356

Mexico-NREL Wind Resource Assessments | Open Energy Information  

Open Energy Info (EERE)

Wind Resource Assessments Wind Resource Assessments Jump to: navigation, search Logo: Mexico-NREL Initiatives Name Mexico-NREL Initiatives Agency/Company /Organization National Renewable Energy Laboratory Sector Energy Focus Area Wind Topics Background analysis Resource Type Dataset, Maps, Software/modeling tools Website http://www.nrel.gov/internatio Country Mexico Central America References NREL International Program Overview [1] Abstract Currently NREL is working with Mexico to develop wind resource assessments including wind maps for Tamuilipas and & Baja California (10/10) and to prepare wind development scenarios for these regions. Currently NREL is working with Mexico to develop wind resource assessments including wind maps for Tamuilipas and & Baja California (10/10) and to

357

Renewable Electric Plant Information System user interface manual: Paradox 7 Runtime for Windows  

DOE Green Energy (OSTI)

The Renewable Electric Plant Information System (REPiS) is a comprehensive database with detailed information on grid-connected renewable electric plants in the US. The current version, REPiS3 beta, was developed in Paradox for Windows. The user interface (UI) was developed to facilitate easy access to information in the database, without the need to have, or know how to use, Paradox for Windows. The UI is designed to provide quick responses to commonly requested sorts of the database. A quick perusal of this manual will familiarize one with the functions of the UI and will make use of the system easier. There are six parts to this manual: (1) Quick Start: Instructions for Users Familiar with Database Applications; (2) Getting Started: The Installation Process; (3) Choosing the Appropriate Report; (4) Using the User Interface; (5) Troubleshooting; (6) Appendices A and B.

NONE

1996-11-01T23:59:59.000Z

358

Risk Informed Safety Categorization (RISC-3) Seismic Assessment Guidelines  

Science Conference Proceedings (OSTI)

The Nuclear Regulatory Commission (NRC) has amended its regulations to provide an alternative approach for treatment of structures, systems, and components (SSCs) for nuclear power reactors using a risk-informed method of categorizing SSCs according to their safety significance.

2005-12-19T23:59:59.000Z

359

Life Cycle Assessment of the MBT plant in Ano Liossia, Athens, Greece  

Science Conference Proceedings (OSTI)

Highlights: Black-Right-Pointing-Pointer We model the operation of an MBT plant in Greece based on LCA. Black-Right-Pointing-Pointer We compare four different MBT operating scenarios (among them and with landfilling). Black-Right-Pointing-Pointer Even the current operation of the MBT plant is preferable to landfilling. Black-Right-Pointing-Pointer Utilization of the MBT compost and metals generates the most environmental gains. Black-Right-Pointing-Pointer Thermal exploitation of RDF improves further the environmental performance of the plant. - Abstract: The aim of this paper is the application of Life Cycle Assessment to the operation of the MBT facility of Ano Liossia in the region of Attica in Greece. The region of Attica is home to almost half the population of Greece and the management of its waste is a major issue. In order to explicitly analyze the operation of the MBT plant, five scenarios were generated. Actual operation data of the MBT plant for the year 2008 were provided by the region of Attica and the LCA modeling was performed via the SimaPro 5.1 software while impact assessment was performed utilizing the Eco-indicator'99 method. The results of our analysis indicate that even the current operation of the MBT plant is preferable to landfilling. Among the scenarios of MBT operation, the one with complete utilization of the MBT outputs, i.e. compost, RDF, ferrous and non-ferrous metals, is the one that generates the most environmental gains. Our analysis indicates that the exploitation of RDF via incineration is the key factor towards improving the environmental performance of the MBT plant. Our findings provide a quantitative understanding of the MBT plant. Interpretation of results showed that proper operation of the modern waste management systems can lead to substantial reduction of environmental impacts and savings of resources.

Abeliotis, Konstadinos, E-mail: kabeli@hua.gr [Department of Home Economics and Ecology, Harokopio University, Athens (Greece); Kalogeropoulos, Alexandros [Department of Home Economics and Ecology, Harokopio University, Athens (Greece); Lasaridi, Katia [Department of Geography, Harokopio University, Athens (Greece)

2012-01-15T23:59:59.000Z

360

ASSESSING CHEMICAL HAZARDS AT THE PLUTONIUM FINISHING PLANT (PFP) FOR PLANNING FUTURE D&D  

Science Conference Proceedings (OSTI)

This paper documents the fiscal year (FY) 2006 assessment to evaluate potential chemical and radiological hazards associated with vessels and piping in the former plutonium process areas at Hanford's Plutonium Finishing Plant (PFP). Evaluations by PFP engineers as design authorities for specific systems and other subject-matter experts were conducted to identify the chemical hazards associated with transitioning the process areas for the long-term layup of PFP before its eventual final decontamination and decommissioning (D and D). D and D activities in the main process facilities were suspended in September 2005 for a period of between 5 and 10 years. A previous assessment conducted in FY 2003 found that certain activities to mitigate chemical hazards could be deferred safely until the D and D of PFP, which had been scheduled to result in a slab-on-grade condition by 2009. As a result of necessary planning changes, however, D and D activities at PFP will be delayed until after the 2009 time frame. Given the extended project and plant life, it was determined that a review of the plant chemical hazards should be conducted. This review to determine the extended life impact of chemicals is called the ''Plutonium Finishing Plant Chemical Hazards Assessment, FY 2006''. This FY 2006 assessment addresses potential chemical and radiological hazard areas identified by facility personnel and subject-matter experts who reevaluated all the chemical systems (items) from the FY 2003 assessment. This paper provides the results of the FY 2006 chemical hazards assessment and describes the methodology used to assign a hazard ranking to the items reviewed.

HOPKINS, A.M.; KLOS, D.B.; MINETT, M.J.

2007-01-25T23:59:59.000Z

Note: This page contains sample records for the topic "information plant assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Scenario development for the Waste Isolation Pilot Plant: Building confidence in the assessment  

SciTech Connect

Scenario development is part of the iterative performance assessment (PA) process for the Waste Isolation Pilot Plant (WIPP). Scenario development for the WIPP has been the subject of intense external review and is certain to be the subject of continued scrutiny as the project proceeds toward regulatory compliance. The principal means of increasing confidence in this aspect of the PA will be through the use of the systematic and thorough procedure toward developing the scenarios and conceptual models on which the assessment is to be based. Early and ongoing interaction with project reviewers can assist with confidence building. Quality of argument and clarity of presentation in PA will be of key concern. Appropriate tools are required for documenting and tracking assumptions, through a single assessment phase, and between iterative assessment phases. Risks associated with future human actions are of particular concern to the WIPP project, and international consensus on the principles for incorporation of future human actions in assessments would be valuable.

Galson, D.A.; Swift, P.N.

1994-07-01T23:59:59.000Z

362

Integrated safety assessment of an oxygen reduction project at Connecticut Yankee Atomic Power's Haddam Neck plant  

SciTech Connect

Connecticut Yankee Atomic Power Company (CYAPCo) has implemented an Integrated Safety Assessment Program (ISAP) for the integrated evaluation and prioritization of plant-specific licensing issues, regulatory policy issues, and plant improvement projects. As part of the ISAP process, probabilistic risk assessment (PRA) is utilized to evaluate the net safety impact of plant modification projects. On a few occasions, implementation of this approach has resulted in the identification of projects with negative safety impacts that could not be quantified via the normal design review and 10CFR50.59 safety evaluation process. An example is a plant modification that was proposed to reduce the oxygen in the Haddam Neck plant's demineralized water storage tank (DWST). The project involved the design and installation of a nitrogen blanketing system on the DWST. The purpose of the project was to reduce the oxygen content on the secondary side, consistent with recommendations from the Electric Power Research Institute Steam Generator Owners Group. Oxygen is one of the contributors to the corrosion process in systems in contact with the feedwater and can cause damage to associated components if not controlled.

Aubrey, J.E.

1987-01-01T23:59:59.000Z

363

GRR/Section 17 - Aesthetic Resource Assessment | Open Energy Information  

Open Energy Info (EERE)

7 - Aesthetic Resource Assessment 7 - Aesthetic Resource Assessment < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 17 - Aesthetic Resource Assessment 17 - Aesthetic Resources Overview.pdf Click to View Fullscreen Contact Agencies Bureau of Land Management Regulations & Policies Wild and Scenic Rivers Act Federal Land Policy and Management Act of 1976 National Environmental Policy Act Clean Air Act Triggers None specified Click "Edit With Form" above to add content 17 - Aesthetic Resources Overview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Aesthetic or Visual Resources are often considered during the land use

364

Solar and Wind Energy Resource Assessment (SWERA) | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » Solar and Wind Energy Resource Assessment (SWERA) (Redirected from SWERA) Jump to: navigation, search SWERA logo.png Solar and Wind Energy Resource Assessment (SWERA) Interactive Web PortalPowered by OpenEI Getting Started Data Sets Analysis Tools About SWERA Tool Summary LAUNCH TOOL Name: Solar and Wind Energy Resource Assessment Agency/Company /Organization: United Nations Environment Programme Partner: National Renewable Energy Laboratory, German Aerospace Center (DLR), Risoe National Laboratory for Sustainable Energy, Brazil's National Institute for Space Research (INPE), State University of New York (SUNY), Technical University of Denmark (DTU), United Nations Environment Programme (UNEP), National Aeronautics and Space Administration, Global Environment Facility (GEF)

365

Risk Assessment in Support of DOE Nuclear Safety, Risk Information Notice,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Risk Assessment in Support of DOE Nuclear Safety, Risk Information Risk Assessment in Support of DOE Nuclear Safety, Risk Information Notice, June 2010 Risk Assessment in Support of DOE Nuclear Safety, Risk Information Notice, June 2010 On August 12, 2009, the Defense Nuclear Facilities Safety Board (DNFSB) issued Recommendation 2009-1, Risk Assessment Methodologies at Defense Nuclear Facilities. This recommendation focused on the need for clear direction on use of quantitative risk assessments in nuclear safety applications at defense nuclear facilities. The Department of Energy (DOE) is presently analyzing directives, standards, training, and other tools that may support more effective development and use of risk assessment. Working with the Chief of Defense Nuclear Safety and the Chief of Nuclear Safety, staff from the Office of Health,

366

Health information on the Internet : strategies for assessing consumer needs and improving consumer information retrieval  

E-Print Network (OSTI)

Patients and their family members are increasingly turning to the Internet for health information. However, the search strategies consumers are using to obtain information are often unsuccessful. Since some patients are ...

Plovnick, Robert M. (Robert Matthew), 1976-

2004-01-01T23:59:59.000Z

367

A Review of Information for Managing Aging in Nuclear Power Plants  

SciTech Connect

Age related degradation effects in safety related systems of nuclear power plants should be managed to prevent safety margins from eroding below the acceptable limits provided in plant design bases. The Nuclear Plant Aging Research (NPAR) Pro- gram, conducted under the auspices of the U.S. Nuclear Regulatory Commission (NRC), Office of Nuclear Regulatory Research, and other related aging management programs are developing technical information on managing aging. The aging management process central to these efforts consists of three key elements: 1) selecting structures, systems, and components (SSCs) in which aging should be controlled; 2) understanding the mechanisms and rates of degradation in these SSCs; and 3) managing degradation through effective inspection, surveillance, condition monitoring, trending, record keeping, mainten- ance, refurbishment, replacement, and adjustments in the operating environment and service conditions. This document concisely reviews and integrates information developed under the NPAR Program and other aging management studies and other available information related to understanding and managing age-related degradation effects and provides specific refer- ences to more comprehensive information on the same subjects.

WC Morgan; JV Livingston

1995-09-01T23:59:59.000Z

368

Waste Isolation Pilot Plant Medical Screening Program, Phase I: Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Isolation Pilot Plant Waste Isolation Pilot Plant Medical Screening Program Phase I: Needs Assessment Presented to the Office of Worker Screening and Compensation Support, Office of Health, Safety, and Security U.S. Department of Energy Prepared by Queens College, City University of New York United Steelworkers Original Draft: August 22, 2011 Updated Version: May 1, 2012 Table of Contents Summary.............................................................................3 I. Background on the Former Worker Program................................4 II. History of the WIPP Facility......................................................4 III. Scope of this Report.................................................................7 IV. Exposure Characterization........................................................8

369

Development of hydrogeological modelling approaches for assessment of consequences of hazardous accidents at nuclear power plants  

SciTech Connect

This paper introduces some modeling approaches for predicting the influence of hazardous accidents at nuclear reactors on groundwater quality. Possible pathways for radioactive releases from nuclear power plants were considered to conceptualize boundary conditions for solving the subsurface radionuclides transport problems. Some approaches to incorporate physical-and-chemical interactions into transport simulators have been developed. The hydrogeological forecasts were based on numerical and semi-analytical scale-dependent models. They have been applied to assess the possible impact of the nuclear power plants designed in Russia on groundwater reservoirs.

Rumynin, V.G.; Mironenko, V.A.; Konosavsky, P.K.; Pereverzeva, S.A. [St. Petersburg Mining Inst. (Russian Federation)

1994-07-01T23:59:59.000Z

370

Assessment of information and communications technology maturity level  

Science Conference Proceedings (OSTI)

The use of information and communications technology (ICT) turned out to be a key factor in the process of the wider development of a country. It is therefore very useful to estimate ICT evolution by the means of an appropriate metric. Based on statistical ... Keywords: ICT country ranking, ICT development, ICT maturity level index, ICT statistics, Structural equation modeling

Vagia Kyriakidou; Christos Michalakelis; Thomas Sphicopoulos

2013-02-01T23:59:59.000Z

371

Life Cycle Assessment of a Parabolic Trough Concentrating Solar Power Plant and Impacts of Key Design Alternatives: Preprint  

DOE Green Energy (OSTI)

Climate change and water scarcity are important issues for today's power sector. To inform capacity expansion decisions, hybrid life cycle assessment is used to evaluate a reference design of a parabolic trough concentrating solar power (CSP) facility located in Daggett, California, along four sustainability metrics: life cycle greenhouse gas (GHG) emissions, water consumption, cumulative energy demand (CED), and energy payback time (EPBT). This wet-cooled, 103 MW plant utilizes mined nitrate salts in its two-tank, thermal energy storage (TES) system. Design alternatives of dry-cooling, a thermocline TES, and synthetically-derived nitrate salt are evaluated. During its life cycle, the reference CSP plant is estimated to emit 26 g CO2eq per kWh, consume 4.7 L/kWh of water, and demand 0.40 MJeq/kWh of energy, resulting in an EPBT of approximately 1 year. The dry-cooled alternative is estimated to reduce life cycle water consumption by 77% but increase life cycle GHG emissions and CED by 8%. Synthetic nitrate salts may increase life cycle GHG emissions by 52% compared to mined. Switching from two-tank to thermocline TES configuration reduces life cycle GHG emissions, most significantly for plants using synthetically-derived nitrate salts. CSP can significantly reduce GHG emissions compared to fossil-fueled generation; however, dry-cooling may be required in many locations to minimize water consumption.

Heath, G. A.; Burkhardt, J. J.; Turchi, C. S.

2011-09-01T23:59:59.000Z

372

Second Assessment, Minnesota: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Assessment, Minnesota: Energy Resources Assessment, Minnesota: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 46.5963193°, -93.8481904° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.5963193,"lon":-93.8481904,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

373

Information Resources: Life-Cycle Assessment of Energy and Environmental  

NLE Websites -- All DOE Office Websites (Extended Search)

Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products This March 28, 2013 webcast reviewed DOE's recently completed three-part study of the life-cycle energy and environmental impacts of LED lighting products relative to incandescent and CFL alternatives. The reports for Parts 1 and 2 were published in February 2012 and June 2012, respectively, providing a literature review and life-cycle assessment (LCA) for lamps utilizing these three light source technologies. Presenters Jason Tuenge of Pacific Northwest National Laboratory and Brad Hollomon of Compa Industries focused on findings from Part 3, which augments the LCA results with chemical analysis of a variety of lamps using standard testing procedures from the U.S. Environmental Protection Agency and the State of California. A total of 22 samples, representing 11 different lamps, were tested to ascertain whether potentially toxic elements are present in concentrations that exceed regulatory thresholds for hazardous waste.

374

Environmental management assessment of the Waste Isolation Pilot Plant (WIPP), Carlsbad, New Mexico  

SciTech Connect

This document contains the results of the Environmental Management Assessment of the Waste Isolation Pilot Plant (WIPP). This Assessment was conducted by EH-24 from July 19 through July 30, 1993 to advise the Secretary of Energy of the adequacy of management systems established at WIPP to ensure the protection of the environment and compliance with Federal, state, and DOE environmental requirements. The mission of WIPP is to demonstrate the safe disposal of transuranic (TRU) waste. During this assessment, activities and records were reviewed and interviews were conducted with personnel from the management and operating contractors. This assessment revealed that WIPP`s environmental safety and health programs are satisfactory, and that all levels of the Waste Isolation Division (WID) management and staff consistently exhibit a high level of commitment to achieve environmental excellence.

Not Available

1993-07-01T23:59:59.000Z

375

Criticality Safety Information Meeting for the Hanford Plutonium Finihsing Plant, May 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

2-05-14 2-05-14 Site: DOE-Richland Operations Office Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for Criticality Safety Information Meeting for the Plutonium Finishing Plant Dates of Activity : May 14, 2012 Report Preparer: Ivon Fergus Activity Description/Purpose: The U.S. Department of Energy's (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), conducted a criticality safety information meeting with Hanford site criticality safety engineers on May 14, 2012, to discuss criticality safety issues and experiences principally with respect to the Decontamination and Decommissioning (D&D) activities at the Plutonium Finishing Plant (PFP). These discussions also included aspects of Non-

376

Criticality Safety Information Meeting for the Hanford Plutonium Finihsing Plant, May 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-05-14 2-05-14 Site: DOE-Richland Operations Office Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for Criticality Safety Information Meeting for the Plutonium Finishing Plant Dates of Activity : May 14, 2012 Report Preparer: Ivon Fergus Activity Description/Purpose: The U.S. Department of Energy's (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), conducted a criticality safety information meeting with Hanford site criticality safety engineers on May 14, 2012, to discuss criticality safety issues and experiences principally with respect to the Decontamination and Decommissioning (D&D) activities at the Plutonium Finishing Plant (PFP). These discussions also included aspects of Non-

377

Assessment of the radiological impact of a decommissioning nuclear power plant in Italy  

E-Print Network (OSTI)

The assessment of the radiological impact of a decommissioning Nuclear Power Plant is presented here through the results of an environmental monitoring survey carried out in the area surrounding the Garigliano Power Plant. The levels of radioactivity in soil, water, air and other environmental matrices are shown, in which {\\alpha}, {\\beta} and {\\gamma} activity and {\\gamma} equivalent dose rate are measured. Radioactivity levels of the samples from the Garigliano area are analyzed and then compared to those from a control zone situated more than 100 km away. Moreover, a comparison is made with a previous survey held in 2001. The analyses and comparisons show no significant alteration in the radiological characteristics of the area surroundings the plant, with an overall radioactivity depending mainly from the global fallout and natural sources.

A. Petraglia; C. Sabbarese; M. De Cesare; N. De Cesare; F. Quinto; F. Terrasi; A. D'Onofrio; P. Steier; L. K. Fifield; A. M. Esposito

2012-07-17T23:59:59.000Z

378

Assessment of the radiological impact of a decommissioning nuclear power plant in Italy  

E-Print Network (OSTI)

The assessment of the radiological impact of a decommissioning Nuclear Power Plant is presented here through the results of an environmental monitoring survey carried out in the area surrounding the Garigliano Power Plant. The levels of radioactivity in soil, water, air and other environmental matrices are shown, in which {\\alpha}, {\\beta} and {\\gamma} activity and {\\gamma} equivalent dose rate are measured. Radioactivity levels of the samples from the Garigliano area are analyzed and then compared to those from a control zone situated more than 100 km away. Moreover, a comparison is made with a previous survey held in 2001. The analyses and comparisons show no significant alteration in the radiological characteristics of the area surroundings the plant, with an overall radioactivity depending mainly from the global fallout and natural sources.

Petraglia, A; De Cesare, M; De Cesare, N; Quinto, F; Terrasi, F; D'Onofrio, A; Steier, P; Fifield, L K; Esposito, A M; 10.1051/radiopro/2012010

2012-01-01T23:59:59.000Z

379

Economic Assessment of a Conceptual Biomass to Liquids Bio-Syntrolysis Plant  

SciTech Connect

A series of assessments evaluated the economic efficiency of integrating a nuclear electric power plant with a biomass to SynFuel plant under three market scenarios. Results strongly suggest that a nuclear assisted-BioSyntrolysis Process would be as cost competitive as other carbon feedstock to liquid fuels concepts while having significant advantages regarding CO2 greenhouse gas production. This concept may also be competitive for those energy markets where energy dense, fossil fuels are scarce while wind, hydroelectric, or other renewable energy sources can be produced at a relatively low cost. At this time, a realistic vision of this technologys deployment of a biomass to synfuel plants powered by a nuclear 1100 MWe reactor. Accompanying an area of 25 miles by 25 miles, this integrated Enterprise could produce 24,000 BBLs of SynFuel daily; or 0.2% of the U.S.s imported oil.

M. M. Plum; G. L. Hawkes

2010-06-01T23:59:59.000Z

380

A safety and regulatory assessment of generic BWR and PWR permanently shutdown nuclear power plants  

SciTech Connect

The long-term availability of less expensive power and the increasing plant modification and maintenance costs have caused some utilities to re-examine the economics of nuclear power. As a result, several utilities have opted to permanently shutdown their plants. Each licensee of these permanently shutdown (PSD) plants has submitted plant-specific exemption requests for those regulations that they believe are no longer applicable to their facility. This report presents a regulatory assessment for generic BWR and PWR plants that have permanently ceased operation in support of NRC rulemaking activities in this area. After the reactor vessel is defueled, the traditional accident sequences that dominate the operating plant risk are no longer applicable. The remaining source of public risk is associated with the accidents that involve the spent fuel. Previous studies have indicated that complete spent fuel pool drainage is an accident of potential concern. Certain combinations of spent fuel storage configurations and decay times, could cause freshly discharged fuel assemblies to self heat to a temperature where the self sustained oxidation of the zircaloy fuel cladding may cause cladding failure. This study has defined four spent fuel configurations which encompass all of the anticipated spent fuel characteristics and storage modes following permanent shutdown. A representative accident sequence was chosen for each configuration. Consequence analyses were performed using these sequences to estimate onsite and boundary doses, population doses and economic costs. A list of candidate regulations was identified from a screening of 10 CFR Parts 0 to 199. The continued applicability of each regulation was assessed within the context of each spent fuel storage configuration and the results of the consequence analyses.

Travis, R.J.; Davis, R.E.; Grove, E.J.; Azarm, M.A. [Brookhaven National Lab., Upton, NY (United States)

1997-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "information plant assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Aging assessment of essential HVAC chillers used in nuclear power plants  

SciTech Connect

The Pacific Northwest Laboratory conducted a comprehensive aging assessment of chillers used in the essential safety air-conditioning systems in nuclear power plants (NPPs). The chillers used, and air-conditioning systems served, vary in design from plant to plant. The review of operating experience indicated that chillers experience aging degradation and failures. The primary aging factors of concern for chillers include vibration, excessive temperatures and pressures, thermal cycling, chemical attack, and poor quality cooling water. The evaluation of Licensee Event Reports (LERs) indicated that about 38% of the failures were primarily related to aging, 55% were partially aging related, and 7% of the failures were unassignable. About 25% of the failures were primarily caused by human, design, procedure, and other errors. The large number of errors is probably directly related to the complexity of chillers and their interfacing systems. Nearly all of the LERs were the result of entering plant Technical Specification Limiting Condition for Operation (LCO) that initiated remedial actions like plant shutdown procedures. The trend for chiller-related LERs has stabilized at about 0.13 LERs per plant year since 1988. Carefully following the vendor procedures and monitoring the equipment can help to minimize and/or eliminate most of the premature failures. Recording equipment performance can be useful for trending analysis. Periodic operation for a few hours on a weekly or monthly basis is useful to remove moisture and non-condensable gases that gradually build up inside the chiller. Chiller pressurization kits are available that will help minimize the amount of moisture and air ingress to low-pressure chillers during standby periods. The assessment of service life condition monitoring of chillers indicated there are many simple to sophisticated methods available that can help in chiller surveillance and monitoring.

Blahnik, D.E.; Camp, T.W.

1996-09-01T23:59:59.000Z

382

Assessing Cancer Risk of Coal-Fired Power Plant Workers Exposed to PAHs  

Science Conference Proceedings (OSTI)

To study the relationship between the concentration of urinary 1-OH-Py, 3-OH-BaP and the degree as well as the pathways of human exposure to PAHs, we collected 24-hour air, dietary and urine samples of 60 oven workers in a coal-fired power plant of Central ... Keywords: biomarkers, medium-air and food, polycyclic aromatic hydrocarbons (PAHs), exposure assessment, cancer risk

Bin Li; Zhaolong Zhang; Haitao Fan; Cheng Zeng

2012-05-01T23:59:59.000Z

383

Assessment of EPRI Fuel Reliability Guidelines for New Nuclear Plant Designs  

Science Conference Proceedings (OSTI)

As the nuclear power industry pursues the licensing, construction and operation of new advanced LWR designs to meet growing electrical demand, a high level of fuel reliability will be a key factor in the ultimate acceptance and sustainability of these new plants. The new reactor designs under consideration by the industry will utilize fuel assembly/rod designs and operating conditions that are similar to the current fleet. This report assesses the applicability of the EPRI Fuel Reliability Program (FRP) ...

2009-12-09T23:59:59.000Z

384

Initial assessment of the operability of the VHTR-HTSE nuclear hydrogen plant.  

DOE Green Energy (OSTI)

The generation of hydrogen from nuclear power will need to compete on three fronts: production, operability, and safety to be viable in the energy marketplace of the future. This work addresses the operability of a coupled nuclear and hydrogen-generating plant while referring to other work for progress on production and safety. Operability is a measure of how well a plant can meet time-varying production demands while remaining within equipment limits. It can be characterized in terms of the physical processes that underlie operation of the plant. In this work these include the storage and transport of energy within components as represented by time constants and energy capacitances, the relationship of reactivity to temperature, and the coordination of heat generation and work production for a near-ideal gas working fluid. Criteria for assessing operability are developed and applied to the Very High Temperature Reactor coupled to the High Temperature Steam Electrolysis process, one of two DOE/INL reference plant concepts for hydrogen production. Results of preliminary plant control and stability studies are described. A combination of inventory control in the VHTR plant and flow control in the HTSE plant proved effective for maintaining hot-side temperatures near constant during quasi-static change in hydrogen production rate. Near constant electrolyzer outlet temperature is achieved by varying electrolyzer cell area to control cell joule heating. It was found that rates of temperature change in the HTSE plant for a step change in hydrogen production rate are largely determined by the thermal characteristics of the electrolyzer. It's comparatively large thermal mass and the presence of recuperative heat exchangers result in a tight thermal coupling of HTSE components to the electrolyzer. It was found that thermal transients arising in the chemical plant are strongly damped at the reactor resulting in a stable combined plant. The large Doppler reactivity component, three times greater than next reactivity component, per unit temperature, is mainly responsible. This is the case even when one of the conditions for out-of-phase oscillations between reactor inlet and outlet temperature, a large time for transport of process heat between the reactor and chemical plant, exists.

Vilim, R. B.; Nuclear Engineering Division

2007-11-01T23:59:59.000Z

385

An assessment of mercury emissions and health risks from a coal-fired power plant  

Science Conference Proceedings (OSTI)

Title 3 of the 1990 Clean Air Act Amendments (CAAA) mandated that the US Environmental Protection Agency (EPA) evaluate the need to regulate mercury emissions from electric utilities. In support of this forthcoming regulatory analysis the U.S. DOE, sponsored a risk assessment project at Brookhaven (BNL) to evaluate methylmercury (MeHg) hazards independently. In the US MeHg is the predominant way of exposure to mercury originated in the atmosphere. In the BNL study, health risks to adults resulting from Hg emissions from a hypothetical 1,000 MW coal-fired power plant were estimated using probabilistic risk assessment techniques. This study showed that the effects of emissions of a single power plant may double the background exposures to MeHg resulting from consuming fish obtained from a localized area near the power plant. Even at these more elevated exposure levels, the attributable incidence in mild neurological symptoms was estimated to be quite small, especially when compared with the estimated background incidence in the population. The current paper summarizes the basic conclusions of this assessment and highlights issues dealing with emissions control and environmental transport.

Fthenakis, V.M.; Lipfert, F.; Moskowitz, P. [Brookhaven National Lab., Upton, NY (United States). Analytical Sciences Div.

1994-12-01T23:59:59.000Z

386

Sustainability Assessment of Coal-Fired Power Plants with Carbon Capture and Storage  

Science Conference Proceedings (OSTI)

Carbon capture and sequestration (CCS) has the ability to dramatically reduce carbon dioxide (CO2) emissions from power production. Most studies find the potential for 70 to 80 percent reductions in CO2 emissions on a life-cycle basis, depending on the technology. Because of this potential, utilities and policymakers are considering the wide-spread implementation of CCS technology on new and existing coal plants to dramatically curb greenhouse gas (GHG) emissions from the power generation sector. However, the implementation of CCS systems will have many other social, economic, and environmental impacts beyond curbing GHG emissions that must be considered to achieve sustainable energy generation. For example, emissions of nitrogen oxides (NOx), sulfur oxides (SOx), and particulate matter (PM) are also important environmental concerns for coal-fired power plants. For example, several studies have shown that eutrophication is expected to double and acidification would increase due to increases in NOx emissions for a coal plant with CCS provided by monoethanolamine (MEA) scrubbing. Potential for human health risks is also expected to increase due to increased heavy metals in water from increased coal mining and MEA hazardous waste, although there is currently not enough information to relate this potential to actual realized health impacts. In addition to environmental and human health impacts, supply chain impacts and other social, economic, or strategic impacts will be important to consider. A thorough review of the literature for life-cycle analyses of power generation processes using CCS technology via the MEA absorption process, and other energy generation technologies as applicable, yielded large variability in methods and core metrics. Nonetheless, a few key areas of impact for CCS were developed from the studies that we reviewed. These are: the impact of MEA generation on increased eutrophication and acidification from ammonia emissions and increased toxicity from MEA production and the impact of increased coal use including the increased generation of NOx from combustion and transportation, impacts of increased mining of coal and limestone, and the disposal of toxic fly ash and boiler ash waste streams. Overall, the implementing CCS technology could contribute to a dramatic decrease in global GHG emissions, while most other environmental and human health impact categories increase only slightly on a global scale. However, the impacts on human toxicity and ecotoxicity have not been studied as extensively and could have more severe impacts on a regional or local scale. More research is needed to draw strong conclusions with respect to the specific relative impact of different CCS technologies. Specifically, a more robust data set that disaggregates data in terms of component processes and treats a more comprehensive set of environmental impacts categories from a life-cycle perspective is needed. In addition, the current LCA framework lacks the required temporal and spatial scales to determine the risk of environmental impact from carbon sequestration. Appropriate factors to use when assessing the risk of water acidification (groundwater/oceans/aquifers depending on sequestration site), risk of increased human toxicity impact from large accidental releases from pipeline or wells, and the legal and public policy risk associated with licensing CO2 sequestration sites are also not currently addressed. In addition to identifying potential environmental, social, or risk-related issues that could impede the large-scale deployment of CCS, performing LCA-based studies on energy generation technologies can suggest places to focus our efforts to achieve technically feasible, economically viable, and environmentally conscious energy generation technologies for maximum impact.

Widder, Sarah H.; Butner, R. Scott; Elliott, Michael L.; Freeman, Charles J.

2011-11-30T23:59:59.000Z

387

Energy and Technolgy Assessment of Zinc and Magnesium Casting Plants, Technical Report Close-out, August 25,2006  

Science Conference Proceedings (OSTI)

Twin City Die Castings Company of Minneapolis, Minnesota, Twin City Die Castings Company was awarded project No. DE-FG36-05GO15097 to perform plant wide assessments of ten (10) die casting facilities that produce zinc and magnesium alloy castings in order to determine improvements and potential cost savings in energy use. Mr. Heider filled the role of team leader for the project and utilized the North American Die Casting Association (NADCA) to conduct audits at team participant plants so as to hold findings specific to each plant proprietary. The intended benefits of the project were to improve energy use through higher operational and process efficiency for the plants assessed. An improvement in energy efficiency of 5 15% was targeted. The primary objectives of the project was to: 1) Expand an energy and technology tool developed by the NADCA under a previous DOE project titled, Energy and Technology Assessment for Die Casting Plants for assessing aluminum die casting plants to be more specifically applicable to zinc and magnesium die casting facilities. 2) Conduct ten (10) assessments of zinc and magnesium die casting plants, within eight (8) companies, utilizing the assessment tool to identify, evaluate and recommend opportunities to enhance energy efficiency, minimize waste, and improve productivity. 3) Transfer the assessment tool to the die casting industry at large.

Twin City Die Castings Company; Tom Heider; North American Die Castings Association

2006-08-25T23:59:59.000Z

388

Catalog of Assessment Methods for Evaluating the Effects of Power Plant Operations on Aquatic Communities  

Science Conference Proceedings (OSTI)

This report documents the current state of knowledge on methods for assessing the effects of stressors on the health, function, integrity and quality of aquatic populations and ecosystems. This information will be valuable to industry, resource agencies, non-governmental environmental organizations, and universities involved in research, management and protection of aquatic resources.

1999-06-15T23:59:59.000Z

389

SLUDGE TREATMENT PROJECT PHASE 1 SLUDGE STORAGE OPTIONS ASSESSMENT OF T PLANT VERSUS ALTERNATE STORAGE FACILITY  

Science Conference Proceedings (OSTI)

The CH2M HILL Plateau Remediation Company (CHPRC) has recommended to the U.S. Department of Energy (DOE) a two phase approach for removal and storage (Phase 1) and treatment and packaging for offsite shipment (Phase 2) of the sludge currently stored within the 105-K West Basin. This two phased strategy enables early removal of sludge from the 105-K West Basin by 2015, allowing remediation of historical unplanned releases of waste and closure of the 100-K Area. In Phase 1, the sludge currently stored in the Engineered Containers and Settler Tanks within the 105-K West Basin will be transferred into sludge transport and storage containers (STSCs). The STSCs will be transported to an interim storage facility. In Phase 2, sludge will be processed (treated) to meet shipping and disposal requirements and the sludge will be packaged for final disposal at a geologic repository. The purpose of this study is to evaluate two alternatives for interim Phase 1 storage of K Basin sludge. The cost, schedule, and risks for sludge storage at a newly-constructed Alternate Storage Facility (ASF) are compared to those at T Plant, which has been used previously for sludge storage. Based on the results of the assessment, T Plant is recommended for Phase 1 interim storage of sludge. Key elements that support this recommendation are the following: (1) T Plant has a proven process for storing sludge; (2) T Plant storage can be implemented at a lower incremental cost than the ASF; and (3) T Plant storage has a more favorable schedule profile, which provides more float, than the ASF. Underpinning the recommendation of T Plant for sludge storage is the assumption that T Plant has a durable, extended mission independent of the K Basin sludge interim storage mission. If this assumption cannot be validated and the operating costs of T Plant are borne by the Sludge Treatment Project, the conclusions and recommendations of this study would change. The following decision-making strategy, which is dependent on the confidence that DOE has in the long term mission for T Plant, is proposed: (1) If the confidence level in a durable, extended T Plant mission independent of sludge storage is high, then the Sludge Treatment Project (STP) would continue to implement the path forward previously described in the Alternatives Report (HNF-39744). Risks to the sludge project can be minimized through the establishment of an Interface Control Document (ICD) defining agreed upon responsibilities for both the STP and T Plant Operations regarding the transfer and storage of sludge and ensuring that the T Plant upgrade and operational schedule is well integrated with the sludge storage activities. (2) If the confidence level in a durable, extended T Plant mission independent of sludge storage is uncertain, then the ASF conceptual design should be pursued on a parallel path with preparation of T Plant for sludge storage until those uncertainties are resolved. (3) Finally, if the confidence level in a durable, extended T Plant mission independent of sludge storage is low, then the ASF design should be selected to provide independence from the T Plant mission risk.

RUTHERFORD WW; GEUTHER WJ; STRANKMAN MR; CONRAD EA; RHOADARMER DD; BLACK DM; POTTMEYER JA

2009-04-29T23:59:59.000Z

390

Renewable Energy Assessment of Bureau of Reclamation Land and Facilities Using Geographic Information Systems  

DOE Green Energy (OSTI)

This report summarizes results of geographic information system screening for solar and wind potential at select Bureau of Reclamation lands in the western United States. The study included both utility-scale and facility-scale potential. This study supplements information in the report titled Renewable Energy Assessment for the Bureau of Reclamation: Final Report.

Heimiller, D.; Haase, S.; Melius, J.

2013-05-01T23:59:59.000Z

391

Background information for the economic assessment of solvent fermentation processes  

DOE Green Energy (OSTI)

An economic assessment of solvent fermentation processes was made. The question of whether or not the increased costs for petrochemical raw materials are sufficiently high now (or their projected costs in the 1980's), such that certain chemicals could be produced commercially from a cheaper raw material, say cellulosics, via various fermentation routes is considered. Specific examples under consideratin are n-butanol, propionic acid, and acetic acid. A qualitative approach was developed, based on major cost factors of alternative routes for making such projections. The technique described can be made as quantitative as desired by applying accepted engineering design and economic analysis principles to the complex, interacting factors that are involved. Some broad qualitative conclusions are made.

Not Available

1977-01-01T23:59:59.000Z

392

FUNCTION OF PHLOEM-BORNE INFORMATION MACROMOLECULES IN INTEGRATING PLANT GROWTH & DEVELOPMENT  

SciTech Connect

Studies on higher plants have revealed the operation of cell-to-cell and long-distance communication networks that mediate the transport of information macromolecules, such as proteins and RNA. Based on the findings from this DOE-funded project and results from other groups, it is now well established that the enucleate sieve tube system of the angiosperms contains a complex set of proteins including RNA binding proteins as well as a unique population of RNA molecules, comprised of both mRNA and small RNA species. Hetero-grafting experiments demonstrated that delivery of such RNA molecules, into the scion, is highly correlated with changes in developmental phenotypes. Furthermore, over the course of this project, our studies showed that plasmodesmata and the phloem are intimately involved in the local and systemic spread of sequence-specific signals that underlie gene silencing in plants. Major advances were also made in elucidating the underlying mechanisms that operate to mediate the selective entry and exit of proteins and RNA into and out of the phloem translocation stream. Our pioneering studies identified the first plant protein with the capacity to both bind specifically to small RNA molecules (si-RNA) and mediate in the cell-to-cell movement of such siRNA. Importantly, studies conducted with support from this DOE program also yielded a detailed characterization of the first phloem-mobile RNP complex isolated from pumpkin, namely the CmRBP50-RNP complex. This RNP complex was shown to bind, in a sequence-specific manner, to a set of transcripts encoding for transcription factors. The remarkable stability of this CmRBP50-RNP complex allows for long-distance delivery of bound transcripts from mature leaves into developing tissues and organs. Knowledge gained from this project can be used to exert control over the long-distance signaling networks used by plants to integrate their physiological and developmental programs at a whole plant level. Eventually, this information will aid in the engineering of elite plant lines with optimal traits for plant growth under non-ideal conditions, enhanced biomass and/or seed yield, and directed carbon allocation for efficient and sustainable biofuels production.

William J. Lucas

2012-11-12T23:59:59.000Z

393

Environmental Assessment for the Modernization of Facilities and Infrastructure for the Non-Nuclear Production Activities Conducted at the Kansas City Plant  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment Environmental Assessment for the Modernization of Facilities and Infrastructure for the Non-Nuclear Production Activities Conducted at the Kansas City Plant DOE/EA - 1592 April 21, 2008 - - This Page Intentionally Blank - - ii COVER SHEET RESPONSIBLE AGENCIES: United States General Services Administration (GSA) and National Nuclear Security Administration (NNSA) TITLE: Modernization of Facilities and Infrastructure for the Non-Nuclear Production Activities Conducted at the Kansas City Plant (DOE/EA-1592) CONTACT: For further information on this EA, write or call: Carlos Salazar GSA Public Buildings Service Heartland Region 1500 E. Bannister Road, Room 2191 (6PTA) Kansas City, MO 64131-3088 (816) 823-2305 Abstract: The United States General Services Administration (GSA) and the United States

394

Assessment of Evaporative Cooling Enhancement Methods for Air-Cooled Geothermal Power Plants: Preprint  

DOE Green Energy (OSTI)

Many binary-cycle geothermal power plants are air cooled because insufficient water is available to provide year-round water cooling. The performance of air-cooled geothermal plants is highly dependent on the dry bulb temperature of the air (much more so than fossil fuel plants that operate at higher boiler temperatures), and plant electric output can drop by 50% or more on hot summer days, compared to winter performance. This problem of reduced summer performance is exacerbated by the fact that electricity has a higher value in the summer. This paper describes a spreadsheet model that was developed to assess the cost and performance of four methods for using supplemental evaporative cooling to boost summer performance: (1) pre-cooling with spray nozzles, (2) pre-cooling with Munters media, (3) a hybrid combination of nozzles and Munters media, and (4) direct deluge cooling of the air-cooled condenser tubes. Although all four options show significant benefit, deluge cooling has the potential to be the most economic. However, issues of scaling and corrosion would need to be addressed.

Kutscher, C.; Costenaro, D.

2002-08-01T23:59:59.000Z

395

An appraisal of the 1992 preliminary performance assessment for the Waste Isolation Pilot Plant  

SciTech Connect

The purpose of the New Mexico Environmental Evaluation Group is to conduct an independent technical evaluation of the Waste Isolation Pilot Plant (WIPP) Project to ensure the protection of the public health and safety and the environment. The WIPP Project, located in southeastern New Mexico, is being constructed as a repository for the disposal of transuranic (TRU) radioactive wastes generated by the national defense programs. The Environmental Evaluation Group (EEG) has reviewed the WIPP 1992 Performance Assessment (Sandia WIPP Performance Assessment Department, 1992). Although this performance assessment was released after the October 1992 passage of the WIPP Land Withdrawal Act (PL 102-579), the work preceded the Act. For individual and ground-water protection, calculations have been done for 1000 years post closure, whereas the US Environmental Protection Agency`s Standards (40 CFR 191) issued in 1993 require calculations for 10,000 years. The 1992 Performance Assessment continues to assimilate improved understanding of the geology and hydrogeology of the site, and evolving conceptual models of natural barriers. Progress has been made towards assessing WIPP`s compliance with the US Environmental Protection Agency`s Standards (40 CFR 191). The 1992 Performance Assessment has addressed several items of major concern to EEG, outlined in the July 1992 review of the 1991 performance assessment (Neill et al., 1992). In particular, the authors are pleased that some key results in this performance assessment deal with sensitivity of the calculated complementary cumulative distribution functions (CCDF) to alterative conceptual models proposed by EEG -- that flow in the Culebra be treated as single-porosity fracture-flow; with no sorption retardation unless substantiated by experimental data.

Lee, W.W.L.; Chaturvedi, L.; Silva, M.K.; Weiner, R.; Neill, R.H. [Environmental Evaluation Group, Albuquerque, NM (United States)]|[Environmental Evaluation Group, Carlsbad, NM (United States)

1994-09-01T23:59:59.000Z

396

Improved assessment of aviation hazards to ground facilities using a geographical information system  

SciTech Connect

A computer based system for performing probabilistic safety assessments (PSAs) of aircraft crashes to ground structures is under development. The system called ACRA (aircraft crash risk assessment) employs a GIS (geographical information system) for locating, mapping, and characterizing ground structures; and a multiparameter data base system that supports the analytical PRA (probabilistic risk assessment) model for determining PSAs for aircraft crashes. The Salt Lake City International Airport (SLC) is being employed as the base case for study and application of ACRA and evaluation of the projected safety assessment.

Sandquist, G.M.; Slaughter, D.M. [Utah Univ., Salt Lake City, UT (United States); Kimura, C.Y.

1996-06-03T23:59:59.000Z

397

BWRVIP-196: BWR Vessel and Internals Project, Assessment of Mixing Tee Thermal Fatigue Susceptibility in BWR Plants  

Science Conference Proceedings (OSTI)

In 1998, a French pressurized water reactor (PWR) plant experienced leakage due to thermal fatigue from piping immediately downstream of a residual heat removal (RHR) heat exchanger. EPRI report 1013305, Materials Reliability Program: Assessment of RHR Mixing Tee Thermal Fatigue in PWR Plants (MRP-192), December 2006, was prepared so that owners of PWR plants could determine if their RHR piping systems might be susceptible to similar thermal fatigue cracking and if additional inspection should be recomme...

2008-09-23T23:59:59.000Z

398

Plant Support Engineering: Failure Mechanism Assessment of Medium Voltage Ethylene Propylene Rubber Cables  

Science Conference Proceedings (OSTI)

This report presents the results of research that assessed failed ethylene propylene rubber (EPR) medium-voltage (MV) cables to determine the failure mechanism. This information will be used to identify appropriate electrical tests that can be performed on in-service cable. Assessed were a 34-year-old cable manufactured by Okonite with black EPR insulation and a 20-year-old Anaconda Uni-Shieldcable with pink EPR. Both had failed, and both had experienced long-term wetting during service.

2007-08-20T23:59:59.000Z

399

Plant Support Engineering: Failure Mechanism Assessment of Medium-Voltage Ethylene Propylene Rubber Cables - Revision 1  

Science Conference Proceedings (OSTI)

This report presents the results of research that assessed failed ethylene propylene rubber (EPR) medium-voltage (MV) cables to determine the failure mechanism. This information will be used to identify appropriate electrical tests that can be performed on in-service cable. Assessed were two 34-year-old cables manufactured by Okonite with black EPR insulation and a 25-year-old Anaconda UniShield cable with pink EPR. All three had failed and had experienced long-term wetting during service. This report is...

2009-05-28T23:59:59.000Z

400

Access and use of information resources in assessing health risks from chemical exposure: Proceedings  

SciTech Connect

Health risk assessment is based on access to comprehensive information about potentially hazardous agents in question. Relevant information is scattered throughout the literature, and often is not readily accessible. To be useful in assessment efforts, emerging scientific findings, risk assess parameters, and associated data must be compiled and evaluated systemically. The US Environmental Protection Agency (EPA) and Oak Ridge National Laboratory (ORNL) are among the federal agencies heavily involved in this effort. This symposium was a direct response by EPA and ORNL to the expressed needs of individuals involved in assessing risks from chemical exposure. In an effort to examine the state of the risk assessment process, the availability of toxicological information, and the future development and transfer of this information, the symposium provided an excellent cadre of speakers and participants from state and federal agencies, academia and research laboratories to address these topics. This stimulating and productive gathering discussed concerns associated with (1) environmental contamination by chemicals; (2) laws regulating chemicals; (3) information needs and resources; (4) applications; (5) challenges and priorities; and (6)future issues. Individual reports are processed separately for the data bases.

Not Available

1990-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "information plant assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Environmental Assessment for the Design and Construction of a Fuel Ethanol Plant, Jasper County, Indiana DOE/EA 1517  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

517 517 ENVIRONMENTAL ASSESSMENT Design and Construction of a Proposed Fuel Ethanol Plant, Jasper County, Indiana April 2005 U.S. Department of Energy Golden Field Office 1617 Cole Blvd. Golden, CO 80401 1 2 3 4 5 6 7 Environmental Assessment Design and Construction of a Proposed Fuel Ethanol Plant, Jasper County, Indiana TABLE OF CONTENTS ACRONYMS AND ABBREVIATIONS ...................................................................................................IV GLOSSARY ................................................................................................................................................ V UNITS OF MEASUREMENT ................................................................................................................. VII

402

Space Nuclear Power Plant Pre-Conceptual Design Report, For Information  

Science Conference Proceedings (OSTI)

This letter transmits, for information, the Project Prometheus Space Nuclear Power Plant (SNPP) Pre-Conceptual Design Report completed by the Naval Reactors Prime Contractor Team (NRPCT). This report documents the work pertaining to the Reactor Module, which includes integration of the space nuclear reactor with the reactor radiation shield, energy conversion, and instrumentation and control segments. This document also describes integration of the Reactor Module with the Heat Rejection segment, the Power Conditioning and Distribution subsystem (which comprise the SNPP), and the remainder of the Prometheus spaceship.

B. Levine

2006-01-27T23:59:59.000Z

403

Environmental Safety and Health Analytical Laboratory, Pantex Plant, Amarillo, Texas. Final Environmental Assessment  

SciTech Connect

The US Department of Energy (DOE) has prepared an Environmental Assessment (EA) of the construction and operation of an Environmental Safety and Health (ES&H) Analytical Laboratory and subsequent demolition of the existing Analytical Chemistry Laboratory building at Pantex Plant near Amarillo, Texas. In accordance with the Council on Environmental Quality requirements contained in 40 CFR 1500--1508.9, the Environmental Assessment examined the environmental impacts of the Proposed Action and discussed potential alternatives. Based on the analysis of impacts in the EA, conducting the proposed action, construction of an analytical laboratory and demolition of the existing facility, would not significantly effect the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA) and the Council on Environmental Quality regulations in 40 CFR 1508.18 and 1508.27.

NONE

1995-06-01T23:59:59.000Z

404

File:07CADCPCNForSmallPowerPlantExemption.pdf | Open Energy Information  

Open Energy Info (EERE)

CADCPCNForSmallPowerPlantExemption.pdf CADCPCNForSmallPowerPlantExemption.pdf Jump to: navigation, search File File history File usage File:07CADCPCNForSmallPowerPlantExemption.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 71 KB, MIME type: application/pdf, 2 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 12:03, 22 January 2013 Thumbnail for version as of 12:03, 22 January 2013 1,275 × 1,650, 2 pages (71 KB) Alevine (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following page links to this file:

405

Field damage assessments as a design tool for information and communications technology systems that are resilient to natural disasters  

Science Conference Proceedings (OSTI)

This paper discusses how to perform field damage assessments after natural disasters as a systematic design tool to achieve information and communications technology (ICT) systems that are more resilient to natural disasters. Hence, damage assessments ... Keywords: damage assessment, information and communication technology systems, natural disasters

Alexis Kwasinski

2011-10-01T23:59:59.000Z

406

Computer Science and Computer Information Systems Faculty: M. Branton, H. ElAarag, D. Plante, H. Pulapaka  

E-Print Network (OSTI)

Computer Science and Computer Information Systems Faculty: M. Branton, H. ElAarag, D. Plante, H. Pulapaka The computer science major at Stetson University provides students a flexible curriculum where they can concentrate in one of two defined degree tracks, Computer Science and Computer Information Systems

Miles, Will

407

Aging assessment of essential HVAC chillers used in nuclear power plants. Phase 1, Volume 1  

SciTech Connect

The Pacific Northwest Laboratory conducted a Phase I aging assessment of chillers used in the essential safety air-conditioning systems of nuclear power plants. Centrifugal chillers in the 75- to 750-ton refrigeration capacity range are the predominant type used. The chillers used, and air-conditioning systems served, vary in design from plant-to-plant. It is crucial to keep chiller internals very clean and to prevent the leakage of water, air, and other contaminants into the refrigerant containment system. Periodic operation on a weekly or monthly basis is necessary to remove moisture and noncondensable gases that gradually build up inside the chiller. This is especially desirable if a chiller is required to operate only as an emergency standby unit. The primary stressors and aging mechanisms that affect chillers include vibration, excessive temperatures and pressures, thermal cycling, chemical attack, and poor quality cooling water. Aging is accelerated by moisture, non-condensable gases (e.g., air), dirt, and other contamination within the refrigerant containment system, excessive start/stop cycling, and operating below the rated capacity. Aging is also accelerated by corrosion and fouling of the condenser and evaporator tubes. The principal cause of chiller failures is lack of adequate monitoring. Lack of performing scheduled maintenance and human errors also contribute to failures.

Blahnik, D.E.; Klein, R.F. [Pacific Northwest Lab., Richland, WA (United States)

1993-09-01T23:59:59.000Z

408

Pollution prevention opportunity assessment for the K-25 Site Steam Plant -- Level 3  

SciTech Connect

A Level 3 pollution prevention opportunity assessment (PPOA) was performed for the K-1501 Steam Plant at the K-25 Site. The primary objective was to identify and evaluate pollution prevention (P2) options to reduce the quantities of each waste stream generated by the Steam Plant. For each of the waste streams, P2 options were evaluated to first reduce the quantity of waste generated and second to recycle the waste. This report provides a process description of the facility; identification, evaluation, and recommendations of P2 options; an implementation schedule with funding sources; and conclusions. Largely for economic reasons, only 3 of the 14 P2 options are being recommended for implementation. All are source reduction options. When implemented, these three options are estimated to reduce the annual generation of waste by 658,412 kg and will result in a cost savings of approximately $29,232/year for the K-25 Site. The recommended options are to: install a flue gas return System in Boiler 7; reduce steam loss from traps; and increase lapse time between rinses. The four boilers currently in operation at the Steam Plant use natural gas or fuel oil as fuel sources.

NONE

1995-09-01T23:59:59.000Z

409

Assessment of instrumentation needs for advanced coal power plant applications: Final report  

DOE Green Energy (OSTI)

The purpose of this study was to identify contaminants, identify instrumentation needs, assess available instrumentation and identify instruments that should be developed for controlling and monitoring gas streams encountered in the following power plants: Integrated Gasification Combined Cycle, Pressurized Fluidized Bed Combustion, and Gasification Molten Carbonate Fuel Cell. Emphasis was placed on hot gas cleanup system gas stream analysis, and included process control, research and environmental monitoring needs. Commercial process analyzers, typical of those currently used for process control purposes, were reviewed for the purpose of indicating commercial status. No instrument selection guidelines were found which were capable of replacing user interaction with the process analyzer vendors. This study leads to the following conclusions: available process analyzers for coal-derived gas cleanup applications satisfy current power system process control and regulatory requirements, but they are troublesome to maintain; commercial gas conditioning systems and in situ analyzers continue to be unavailable for hot gas cleanup applications; many research-oriented gas stream characterization and toxicity assessment needs can not be met by commercially available process analyzers; and greater emphasis should be placed on instrumentation and control system planning for future power plant applications. Analyzers for specific compounds are not recommended other than those needed for current process control purposes. Instead, some generally useful on-line laser-based and inductively coupled plasma methods are recommended for further development because of their potential for use in present hot gas cleanup research and future optimization, component protection and regulation compliance activities. 48 refs., 21 figs., 26 tabs.

Nelson, E.T.; Fischer, W.H.; Lipka, J.V.; Rutkowski, M.D.; Zaharchuk, R.

1987-10-01T23:59:59.000Z

410

The Chemical Hazards Assessments Prior to D&D of the Plutonium Finishing Plant Hanford Nuclear Reservation  

Science Conference Proceedings (OSTI)

All Hanford facilities, including the Plutonium Finishing Plant (PFP) were evaluated for chemical hazards in 1997, 1998 and 2000. The hazard evaluation, known as the PFP Facility Vulnerability Assessment (FVA), was prompted when chemicals in Tank A-109 in the Plutonium Reclamation Facility (PRF) exploded in May 1997. Actions were undertaken to eliminate or reduce what were thought to be the worst hazards following that evaluation. In 2001, a new PFP team was organized to review the progress to date in reducing hazards and to reassess hazards that might still remain within the facility. This reassessment continued into 2002 and is referred to as the 2002 PFP Residual Chemical Hazards Reassessment (RCHR). This report explains the results of the 2001/2002 reassessment of the chemical hazards at PFP. This reassessment effort forms the basis of the RCHR. The RCHR relied on previous assessments as the starting point for the 2001/2002 evaluation and used ranking criteria very similar to previous efforts. The RCHR team was composed of professionals representing Industrial Hygiene, Chemical Engineering, Mechanical Engineering, Hazardous Materials Handling Specialists, Solid Waste Management Specialists and Environmental Specialists. All areas of concern that could be accessed were physically examined and photographed where possible. Information from processing records, facility drawings and documents, design engineers, process engineers and work packages were compiled. The PFP vessel inventory was examined and expanded where required. New items listed in the vessel inventory were investigated. All items investigated were ranked using the hazard ranking criteria developed. This information was put on data sheets and compiled in a database.

FITCH, L.R.; HOPKINS, A.M.

2003-01-01T23:59:59.000Z

411

Assessment of RELAP5/MOD2 against a natural circulation experiment in Nuclear Power Plant Borssele. International Agreement Report  

Science Conference Proceedings (OSTI)

As part of the ICAP (International Code Assessment and Applications Program) agreement between ECN (Netherlands Energy Research Foundation) and USNRC, ECN has performed a number of assessment calculations for the thermohydraulic system analysis code RELAP5/MOD2/36.05. This document describes the assessment of this computer program versus a natural circulation experiment as conducted at the Borssele Nuclear Power Plant. The results of this comparison show that the code RELAP5/MOD2 predicts well the natural circulation behaviour of Nuclear Power Plant Borssele.

Winters, L. [Netherlands Energy Research Foundation (ECN), Petten (Netherlands)

1993-07-01T23:59:59.000Z

412

Proceedings: Decommissioning - Plant Reconfiguration and Engineering Processes Workshop  

Science Conference Proceedings (OSTI)

EPRI's Plant Reconfiguration and Engineering Processes Workshop -- the seventh in a series -- will help utility personnel evaluate technologies for decommissioning nuclear power plants. This workshop focused on specific aspects of plant reconfiguration and engineering processes as they relate to nuclear plant decommissioning. The information presented will help utilities assess approaches to restructuring of plant engineering processes and reconfiguration management to meet individual decommissioning pro...

2001-01-09T23:59:59.000Z

413

Improvement of Cotton Fiber Maturity and Assessment of Intra-Plant Fiber Variability  

E-Print Network (OSTI)

The temporal system of fruiting on the cotton plant lends itself to bolls at different fruiting sites developing under different environmental conditions and with varied source-sink relationships. To investigate this, intra-plant fiber quality was assessed in four upland cultivars at College Station, Texas for three years and at Lubbock, Texas for two years. It was concluded that fiber quality steadily declines from the bottom sympodial branches towards the upper branches. 'FiberMax 832' had the best fiber quality among all cultivars but it also had the highest degree of variability within the plants. 'Half and Half' and 'Acala 1517-99' appear to have the least amount of intra-plant variability of fiber quality. Bolls from the bottom region of the plant have higher trash content compared to the upper region. To test the impact of fiber quality variability on boll sampling techniques employed, ten sampling protocols were compared against each other for three years in College Station, Texas, for two upland cultivars. Results suggest that randomized boll samples containing 50 bolls worked well to estimate inherent fiber quality for most fiber traits while estimation of trash and lint percent was not predictable based on boll samples. One of the problems associated with intra-plant fiber variability was the presence of immature fibers. In order to determine the potential for improvement of fiber maturity and standard fineness, five upland cotton (Gossypium hirsutum L.) genotypes were subjected to a diallel analysis at College Station, Texas, in 2011. Four cultivars that tend to produce fine and mature fibers and one cultivar that tends to produce coarse fibers were intermated in all combinations, without reciprocals. Estimates of general (GCA) and specific combining ability (SCA) for fiber maturity ratio and standard fineness based on Griffing's diallel Model I, Method 4 were calculated for AFIS and fiber micronaire, length and strength measurements for High Volume Instrument (HVI). Four parents had significant GCA effects and Acala 1517-99 was found to be the best parent for improving standard fineness followed by FiberMax 832 and 'Tamcot HQ-95'. Tamcot HQ-95 was the best parent to improve fiber maturity ratio while 'Deltapine 90' was the best parent to reduce fiber maturity ratio. The specific cross between Acala 1517-99 and Tamcot HQ-95 had the best performance. Diallel analysis indicated that fiber maturity ratio was influenced by non-additive gene effects more than additive gene effects while fiber standard fineness was highly influenced by additive gene effects. Developing cultivars with optimal fiber standard fineness and maturity should be prioritized to address problems associated with neps and short fiber content and improve spinning performance of US cotton.

Kothari, Neha

2012-08-01T23:59:59.000Z

414

Simulation-based utility assessment of real-time information for sustainable mining operations  

Science Conference Proceedings (OSTI)

In capital intensive industries such as coalmines, real-time information is useful to run their operations within sustainable limits, and to enable early detection and response to deviations from those limits. The goal of this research is to assess the ...

Sai Srinivas Nageshwaraniyer; Chao Meng; Young-Jun Son; Sean Dessureault

2011-12-01T23:59:59.000Z

415

On the assessment of the strategic value of information technologies: conceptual and analytical approaches  

Science Conference Proceedings (OSTI)

This study compares two conceptual (resource-centered and contingency-based) and two analytical (linear and nonlinear) approaches that can be used to assess the strategic value of information technology. Two hypotheses related to these approaches are ... Keywords: business value of IT, contingency approach, nonlinear approaches, organizational performance, resource-centered view, strategic alignment of IT, strategic value of IT

Wonseok Oh; Alain Pinsonneault

2007-06-01T23:59:59.000Z

416

Using Process Load Cell Information for IAEA Safeguards at Enrichment Plants  

SciTech Connect

Uranium enrichment service providers are expanding existing enrichment plants and constructing new facilities to meet demands resulting from the shutdown of gaseous diffusion plants, the completion of the U.S.-Russia highly enriched uranium downblending program, and the projected global renaissance in nuclear power. The International Atomic Energy Agency (IAEA) conducts verification inspections at safeguarded facilities to provide assurance that signatory States comply with their treaty obligations to use nuclear materials only for peaceful purposes. Continuous, unattended monitoring of load cells in UF{sub 6} feed/withdrawal stations can provide safeguards-relevant process information to make existing safeguards approaches more efficient and effective and enable novel safeguards concepts such as information-driven inspections. The IAEA has indicated that process load cell monitoring will play a central role in future safeguards approaches for large-scale gas centrifuge enrichment plants. This presentation will discuss previous work and future plans related to continuous load cell monitoring, including: (1) algorithms for automated analysis of load cell data, including filtering methods to determine significant weights and eliminate irrelevant impulses; (2) development of metrics for declaration verification and off-normal operation detection ('cylinder counting,' near-real-time mass balancing, F/P/T ratios, etc.); (3) requirements to specify what potentially sensitive data is safeguards relevant, at what point the IAEA gains on-site custody of the data, and what portion of that data can be transmitted off-site; (4) authentication, secure on-site storage, and secure transmission of load cell data; (5) data processing and remote monitoring schemes to control access to sensitive and proprietary information; (6) integration of process load cell data in a layered safeguards approach with cross-check verification; (7) process mock-ups constructed to provide simulated load cell data; (8) hardware and software implementation for process load cell data collection; (9) costs associated with unattended monitoring of load cells (for both operator and inspector) weighed against the potential benefits of having access to such data; (10) results from field tests of load cell data collection systems in operating facilities; and (11) use of unattended load cell data to increase efficiency of on-site inspection schedules and activities.

Laughter, Mark D [ORNL; Whitaker, J Michael [ORNL; Howell, John [University of Glasgow

2010-01-01T23:59:59.000Z

417

Historical Background on Assessment the Performance of the Waste Isolation Pilot Plant  

SciTech Connect

In 1979, six years after selecting the Delaware Basin as a potential disposal area, Congress authorized the US Department of Energy to build the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico, as a research and development facility for the safe management, storage, and disposal of waste contaminated with transuranic radioisotopes. In 1998, 19 years after authorization and 25 years after site selection, the US Environmental Protection Agency (EPA) certified that the WIPP disposal system complied with its regulations. The EPA's decision was primarily based on the results from a performance assessment conducted in 1996. This performance assessment was the culmination of four preliminary performance assessments conducted between 1989 and 1992. This report provides a historical setting and context for how the performance of the deep geologic repository at the WIPP was analyzed. Also included is background on political forces acting on the project. For example, the federal requirement to provide environmental impact statements and negotiated agreements with the State of New Mexico influenced the type of scientific areas that were investigated and the engineering analysis prior to 1989 for the WIPP.

Rechard, R.P.

1999-06-01T23:59:59.000Z

418

Methodology and application of surrogate plant PRA analysis to the Rancho Seco Power Plant: Final report  

Science Conference Proceedings (OSTI)

This report presents the development and the first application of generic probabilistic risk assessment (PRA) information for identifying systems and components important to public risk at nuclear power plants lacking plant-specific PRAs. A methodology is presented for using the results of PRAs for similar (surrogate) plants, along with plant-specific information about the plant of interest and the surrogate plants, to infer important failure modes for systems of the plant of interest. This methodology, and the rationale on which it is based, is presented in the context of its application to the Rancho Seco plant. The Rancho Seco plant has been analyzed using PRA information from two surrogate plants. This analysis has been used to guide development of considerable plant-specific information about Rancho Seco systems and components important to minimizing public risk, which is also presented herein.

Gore, B.F.; Huenefeld, J.C.

1987-07-01T23:59:59.000Z

419

Assessment Hydrogen Production with CO2 Capture, Volume 1: Baseline State of the Art Plants  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydrogen Hydrogen Production with CO 2 Capture Volume 1: Baseline State-of- the-Art Plants August 30, 2010 DOE/NETL-2010/1434 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States

420

Radiological assessment of the decontamination and decommissioning of a small-scale fuel-reprocessing plant  

SciTech Connect

Decontamination and decommissioning (D and D) of surplus radiological facilities is becoming a major concern as buildings built during the 1940's and 1950's reach the end of their useful lives. Prior to the start of a D and D project, a detailed radiological characterization of the facility is required to determine the nature and extent of residual contamination. The Oak Ridge National Laboratory (ORNL) has recently begun such a characterization of Building 3505, originally called the Metal Recovery Facility, which served as a small-scale fuel reprocessing plant during the 1950's. Extensive contamination remains within areas of the facility, including transuranic (TRU) materials. Laboratory analyses were used in conjunction with in situ measurements of dose rate and contamination levels to determine the current status of the building and surrounding area. This information will be used to estimate the amount of decontamination required and the quantity of radioactive waste.

Simpson, D.R.; Emery, J.F.

1981-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "information plant assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Focused risk assessment: Mound Plant, Miami-Erie Canal Operable Unit 4  

SciTech Connect

In 1969, an underground waste line at Mound Plant ruptured and released plutonium-238 in a dilute nitric acid solution to the surrounding soils. Most of the acid was neutralized by the native soils. The plutonium, which in a neutral solution is tightly sorbed onto clay particles, remained within the spill area. During remediation, a severe storm eroded some of the contaminated soil. Fine grained plutonium-contaminated clay particles were carried away through the natural drainage courses to the remnants of the Miami-Erie Canal adjacent to Mound Plant, and then into the Great Miami River. This focused risk assessment considers exposure pathways relevant to site conditions, including incidental ingestion of contaminated soils, ingestion of drinking water and fish, and inhalation of resuspended soils and sediments. For each potential exposure pathway, a simplified conceptual model and exposure scenarios have been used to develop conservative estimates of potential radiation dose equivalents and health risks. The conservatism of the dose and risk estimates provides a substantive margin of safety in assuring that the public health is protected.

Rogers, D.R.; Dunning, D.F.

1994-09-29T23:59:59.000Z

422

Chronological Reliability Model Incorporating Wind Forecasts to Assess Wind Plant Reserve Allocation: Preprint  

DOE Green Energy (OSTI)

Over the past several years, there has been considerable development and application of wind forecasting models. The main purpose of these models is to provide grid operators with the best information available so that conventional power generators can be scheduled as efficiently and as cost-effectively as possible. One of the important ancillary services is reserves, which involves scheduling additional capacity to guard against shortfalls. In a recent paper, Strbac and Kirschen[1] proposed a method to allocate the reserve burden to generators. Although Milligan adapted this technique to wind plants[2], neither of these papers accounts for the wind forecast in the reliability calculation. That omission is rectified here. For the system studied in this paper, we found that a reserve allocation scheme using 1-hour forecasts results in a small allocation of system reserve relative to the rated capacity of the wind power plant. This reserve allocation is even smaller when geographically dispersed wind sites are used instead of a large single site.

Milligan, M. R.

2002-05-01T23:59:59.000Z

423

SRC-1: coal liquefaction demonstration plant. Project Baseline assessment report supplement  

Science Conference Proceedings (OSTI)

ICRC issued a Revised Baseline for the SRC-I Demonstration Project in order to incorporate the results of these research activities and the changes in the design that had occurred since FY82. The Revised Baseline, prepared by ICRC, provides the necessary information for any future government or commercial decisions relating to the design, construction and operation of an SRC-I-type coal liquefaction facility. No further activities to complete the design of the demonstration plant, or to proceed with construction are planned by DOE. The Project Baseline is an ICRC-documented reference for controlling any future project work and cost. The original Baseline was issued in March 1982; this summary document is available from National Technical Information Service (NTIS) as document number DOE/ORO/030540-T13. The Revised Baseline (dated April 1984) is available as document numbers DOE/OR/03054-T14 and T16. Supporting documentation, in the main concerned with research activities undertaken in support of the design, is also available from NTIS as DOE/OR/03054-T1 through T10 and DOE/OR/03054-1 through 125. The Baseline itself is made up of a documented design configuration, a documented estimate, in First Quarter Fiscal Year 1982 Dollars (1QFY82$), and a detailed schedule of the activities required to complete the project as of 3QFY82. The Baseline design is embodied in the 26 process design packages and other support documentation identified in the Baseline, as well as preliminary engineering flow diagrams prepared for all of the major process areas of the plant. All elements of the Project Baseline were developed within the constraints of the project criteria.

Not Available

1984-09-01T23:59:59.000Z

424

Unit-Contingent Power Purchase Agreement and Asymmetric Information About Plant Outage  

Science Conference Proceedings (OSTI)

This paper analyzes a unit-contingent power purchase agreement between an electricity distributor and a power plant. Under such a contract the distributor pays the plant a fixed price if the plant is operational and nothing if plant outage occurs. Pricing ... Keywords: electricity industry, risk allocation, spot market, unit-contingent contract

Owen Q. Wu; Volodymyr Babich

2012-04-01T23:59:59.000Z

425

U.S. Steam Turbine Valve Actuator Condition Assessment  

Science Conference Proceedings (OSTI)

This report provides nuclear and fossil plant personnel with current information on the inspection and assessment of steam turbine valve actuators.

2008-12-23T23:59:59.000Z

426

Instrumentation and Control, Human System Interface, and Information Technology Requirements Project Plan for Nuclear Power Plant Lo ng-Term Operation  

Science Conference Proceedings (OSTI)

Nuclear power plant owners are looking to extend the operating life of their plants to 80 years and potentially longer. Instrumentation and control, human system interface, and information technologies have changed drastically since the plants were built and will change even more drastically before the plants reach the end of their operating life. A project plan to develop requirements for these technologies is defined here. These requirements will enable plants to better identify future solutions that w...

2010-02-03T23:59:59.000Z

427

Preliminary performance assessment for the Waste Isolation Pilot Plant, December 1992. Volume 3, Model parameters: Sandia WIPP Project  

Science Conference Proceedings (OSTI)

This volume documents model parameters chosen as of July 1992 that were used by the Performance Assessment Department of Sandia National Laboratories in its 1992 preliminary performance assessment of the Waste Isolation Pilot Plant (WIPP). Ranges and distributions for about 300 modeling parameters in the current secondary data base are presented in tables for the geologic and engineered barriers, global materials (e.g., fluid properties), and agents that act upon the WIPP disposal system such as climate variability and human-intrusion boreholes. The 49 parameters sampled in the 1992 Preliminary Performance Assessment are given special emphasis with tables and graphics that provide insight and sources of data for each parameter.

Not Available

1992-12-29T23:59:59.000Z

428

Environmental assessment: Raft River geothermal project pilot plant, Cassia County, Idaho  

DOE Green Energy (OSTI)

The action assessed here is the construction and operation of a 5- to 6-MW(e) (gross) geothermal pilot plant in the Raft River Valley of southern Idaho. This project was originally planned as a thermal test loop using a turbine simulator valve. The test loop facility (without the simulator valve) is now under construction. The current environmental assessment addresses the complete system including the addition of a turbine-generator and its associated switching gear in place of the simulator valve. The addition of the turbine-generator will result in a net production of 2.5 to 3.5 MW(e) with a commensurate reduction in waste heat to the cooling tower and will require the upgrading of existing transmission lines for offsite delivery of generated power. Construction of the facility will require disturbance of approximately 20 ha (50 acres) for the facility itself and approximately 22.5 ha (57 acres) for construction of drilling pads and ponds, pipelines, and roads. Existing transmission lines will be upgraded for the utility system interface. Interference with alternate land uses will be minimal. Loss of wildlife habitat will be acceptable, and US Fish and Wildlife Service recommendations for protection of raptor nesting sites, riparian vegetation, and other important habitats will be observed. During construction, noise levels may reach 100 dBA at 15 m (50 ft) from well sites, but wildlife and local residents should not be significantly affected if extended construction is not carried out within 0.5 km (0.3 miles) of residences or sensitive wildlife habitat. Water use during construction will not be large and impacts on competing uses are unlikely.

Not Available

1979-09-01T23:59:59.000Z

429

Capturing and Sequestering CO2 from a Coal-Fired Power Plant - Assessing the Net Energy and Greenhouse Gas Emissions  

NLE Websites -- All DOE Office Websites (Extended Search)

Capturing and Sequestering CO Capturing and Sequestering CO 2 from a Coal-fired Power Plant - Assessing the Net Energy and Greenhouse Gas Emissions Pamela L. Spath (pamela_spath @nrel.gov; (303) 275-4460) Margaret K. Mann (margaret_mann @nrel.gov; (303) 275-2921) National Renewable Energy Laboratory 1617 Cole Boulevard Golden, CO 80401 INTRODUCTION It is technically feasible to capture CO 2 from the flue gas of a coal-fired power plant and various researchers are working to understand the fate of sequestered CO 2 and its long term environmental effects. Sequestering CO 2 significantly reduces the CO 2 emissions from the power plant itself, but this is not the total picture. CO 2 capture and sequestration consumes additional energy, thus lowering the plant's fuel to electricity efficiency. To compensate for this, more fossil fuel must be

430

Y. Yiliyasi and D. Berleant, "World oil reserves data: information quality assessment and analysis," 16th International Conference on Information Quality, Nov. 18-20, 2011, Adelaide, Australia  

E-Print Network (OSTI)

Y. Yiliyasi and D. Berleant, "World oil reserves data: information quality assessment and analysis," 16th International Conference on Information Quality, Nov. 18-20, 2011, Adelaide, Australia WORLD OIL jdberleant@ualr.edu Abstract: While high quality oil data can help oil companies and governments reduce risk

Berleant, Daniel

431

Goodyear Tire Plant Gains Traction on Energy Savings After Completing Save Energy Now Assessment (Revised)  

Science Conference Proceedings (OSTI)

This DOE Save Energy Now case study describes how the Goodyear Tire Plant saves approx. 93,000 MMBtu and $875,000 annually after increasing steam system energy efficiency in the Union City, TN, plant.

Not Available

2008-04-01T23:59:59.000Z

432

Incorporating long-term climate change in performance assessment for the Waste Isolation Pilot Plant  

SciTech Connect

The United States Department of Energy (DOE) is developing the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico for the disposal of transuranic wastes generated by defense programs. Applicable regulations (40 CFR 191) require the DOE to evaluate disposal-system performance for 10,000 yr. Climatic changes may affect performance by altering groundwater flow. Paleoclimatic data from southeastern New Mexico and the surrounding area indicate that the wettest and coolest Quaternary climate at the site can be represented by that at the last glacial maximum, when mean annual precipitation was approximately twice that of the present. The hottest and driest climates have been similar to that of the present. The regularity of global glacial cycles during the late Pleistocene confirms that the climate of the last glacial maximum is suitable for use as a cooler and wetter bound for variability during the next 10,000 yr. Climate variability is incorporated into groundwater-flow modeling for WIPP PA by causing hydraulic head in a portion of the model-domain boundary to rise to the ground surface with hypothetical increases in precipitation during the next 10,000 yr. Variability in modeled disposal-system performance introduced by allowing head values to vary over this range is insignificant compared to variability resulting from other causes, including incomplete understanding of transport processes. Preliminary performance assessments suggest that climate variability will not affect regulatory compliance.

Swift, P.N. [Sandia National Labs., Albuquerque, NM (United States); Baker, B.L. [Technadyne Engineering Consultants, Inc., Albuquerque, NM (United States); Economy, K. [Ecodynamics Research Associates, Albuquerque, NM (United States); Garner, J.W. [Applied Physics, Inc., Albuquerque, NM (United States); Helton, J.C. [Arizona State Univ., Tempe, AZ (United States); Rudeen, D.K. [New Mexico Engineering Research Inst., Albuquerque, NM (United States)

1993-09-18T23:59:59.000Z

433

An adaptive network based fuzzy inference system-genetic algorithm clustering ensemble algorithm for performance assessment and improvement of conventional power plants  

Science Conference Proceedings (OSTI)

Performance measurement and assessment are fundamental to management planning and control activities of complex systems such as conventional power plants. They have received considerable attention by both management practitioners and theorists. There ... Keywords: Adaptive network based fuzzy inference system (ANFIS), Conventional power plants, Genetic algorithm clustering ensemble (GACE), Improvement, Performance assessment

A. Azadeh; M. Saberi; M. Anvari; A. Azaron; M. Mohammadi

2011-03-01T23:59:59.000Z

434

GRR/Section 7-OR-a - State Plant Construction | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 7-OR-a - State Plant Construction GRR/Section 7-OR-a - State Plant Construction < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-OR-a - State Plant Construction 07ORAStatePlantConstruction (1).pdf Click to View Fullscreen Contact Agencies Oregon Department of Energy Regulations & Policies Facility siting rules and statutes Triggers None specified Click "Edit With Form" above to add content 07ORAStatePlantConstruction (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The State Siting Board has siting jurisdiction over electric power generating plants described as energy facilities in Oregon Revised Statute

435

Assessment of ISLOCA risk-methodology and application to a combustion engineering plant  

Science Conference Proceedings (OSTI)

Inter-system loss-of-coolant accidents (ISLOCAs) have been identified as important contributors to offsite risk for some nuclear power plants. A methodology has been developed for identifying and evaluating plant-specific hardware designs, human factors issues, and accident consequence factors relevant to the estimation of ISOLOCA core damage frequency and risk. This report presents a detailed of description of the application of this analysis methodology to a Combustion Engineering plant.

Kelly, D.L.; Auflick, J.L.; Haney, L.N. [EG and G Idaho, Inc., Idaho Falls, ID (United States)

1992-04-01T23:59:59.000Z

436

Assessment and design of small-scale hydro-electric power plants.  

E-Print Network (OSTI)

??Appraisal and design of small-scale hydro power plants requires a knowledge of hydraulics, hydrology, civil, mechanical, and electrical engineering, and basic economics. Further, small hydro (more)

Jones, ID

1988-01-01T23:59:59.000Z

437

A baseline assessment of local mercury deposition from coal-fired power plants in Central Texas.  

E-Print Network (OSTI)

??Coal-fired power plants represent the largest source of anthropogenic mercury in the world. The Central Texas region as represented by the Heart of Texas Council (more)

Furl, Chad Van.

2006-01-01T23:59:59.000Z

438

U.S. DOE Industrial Technologies Program Technology Delivery Plant-Wide Assessment at PPG Industries, Natrium, WV  

SciTech Connect

PPG and West Virginia University performed a plantwide energy assessment at the PPGs Natrium, WV chemical plant, an energy-intensive manufacturing facility producing chlor-alkali and related products. Implementation of all the assessment recommendations contained in this report could reduce plant energy consumption by 8.7%, saving an estimated 10,023,192 kWh/yr in electricity, 6,113 MM Btu/yr in Natural Gas, 401,156 M lb/yr in steam and 23,494 tons/yr in coal and reduce carbon dioxide emissions by 241 mm lb/yr. The total cost savings would amount to approximately $2.9 mm/yr. Projects being actively implemented will save $1.7 mm/yr; the remainder are undergoing more detailed engineering study.

Lester, Stephen R.; Wiethe, Jeff; Green, Russell; Guice, Christina; Gopalakrishnan, Bhaskaran; Turton, Richard

2007-09-28T23:59:59.000Z

439

Surgut steam power plant: Block 1, unit 1 reconstruction feasibility study. Volume 2. Export trade information  

Science Conference Proceedings (OSTI)

Project Description; Work Tasks: Review Plant Data; Power Cycle, Heat Balance Study; Heat Cycle Screening and Selection; Selected Heat Cycle Discussion; Heat Balance Summary Data and Diagram; Plant Conceptual Engineering; Major Mechanical System Descriptions; Main, Reheat, District Heating Steam Systems; Feedwater and Condensate System; HRSG Blowdown System; Chemical Feed System; Auxiliary Cooling System; Natural Gas Fuel System; Piping System; and Flue Gas System.

Not Available

1993-11-24T23:59:59.000Z

440

Property:EIA/861/OperatesGeneratingPlant | Open Energy Information  

Open Energy Info (EERE)

OperatesGeneratingPlant OperatesGeneratingPlant Jump to: navigation, search This is a property of type Boolean. Description: Operates Generating Plant Entity operates power generating plants (Y or N) [1] References ↑ EIA Form EIA-861 Final Data File for 2008 - F861 File Layout-2008.doc Pages using the property "EIA/861/OperatesGeneratingPlant" Showing 25 pages using this property. (previous 25) (next 25) A A & N Electric Coop (Virginia) + true + AEP Generating Company + true + AES Eastern Energy LP + true + AGC Division of APG Inc + true + Akiachak Native Community Electric Co + true + Alabama Municipal Elec Authority + true + Alabama Power Co + true + Alaska Electric & Energy Coop + true + Alaska Electric Light&Power Co + true + Alaska Energy Authority + true +

Note: This page contains sample records for the topic "information plant assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.