National Library of Energy BETA

Sample records for information plant assessments

  1. Risk Informed Assessment of Regulatory and Design Requirements for Future Nuclear Power Plants - Final Technical Report

    SciTech Connect (OSTI)

    Ritterbusch, Stanley; Golay, Michael; Duran, Felicia; Galyean, William; Gupta, Abhinav; Dimitrijevic, Vesna; Malsch, Marty

    2003-01-29

    OAK B188 Summary of methods proposed for risk informing the design and regulation of future nuclear power plants. All elements of the historical design and regulation process are preserved, but the methods proposed for new plants use probabilistic risk assessment methods as the primary decision making tool.

  2. Risk-informed assessment of regulatory and design requirements for future nuclear power plants. Annual report

    SciTech Connect (OSTI)

    NONE

    2000-08-01

    OAK B188 Risk-informed assessment of regulatory and design requirements for future nuclear power plants. Annual report. The overall goal of this research project is to support innovation in new nuclear power plant designs. This project is examining the implications, for future reactors and future safety regulation, of utilizing a new risk-informed regulatory system as a replacement for the current system. This innovation will be made possible through development of a scientific, highly risk-formed approach for the design and regulation of nuclear power plants. This approach will include the development and/or confirmation of corresponding regulatory requirements and industry standards. The major impediment to long term competitiveness of new nuclear plants in the U.S. is the capital cost component--which may need to be reduced on the order of 35% to 40% for Advanced Light Water Reactors (ALWRS) such as System 80+ and Advanced Boiling Water Reactor (ABWR). The required cost reduction for an ALWR such as AP600 or AP1000 would be expected to be less. Such reductions in capital cost will require a fundamental reevaluation of the industry standards and regulatory bases under which nuclear plants are designed and licensed. Fortunately, there is now an increasing awareness that many of the existing regulatory requirements and industry standards are not significantly contributing to safety and reliability and, therefore, are unnecessarily adding to nuclear plant costs. Not only does this degrade the economic competitiveness of nuclear energy, it results in unnecessary costs to the American electricity consumer. While addressing these concerns, this research project will be coordinated with current efforts of industry and NRC to develop risk-informed, performance-based regulations that affect the operation of the existing nuclear plants; however, this project will go further by focusing on the design of new plants.

  3. Enterprise Assessments Review, Waste Isolation Pilot Plant -...

    Office of Environmental Management (EM)

    Enterprise Assessments Review, Waste Isolation Pilot Plant - December 2014 Enterprise Assessments Review, Waste Isolation Pilot Plant - December 2014 December, 2014 Review of the...

  4. Nuclear Energy Research Initiative. Risk Informed Assessment of Regulatory and Design Requirements for Future Nuclear Power Plants. Annual Report

    SciTech Connect (OSTI)

    Ritterbusch, S.E.

    2000-08-01

    The overall goal of this research project is to support innovation in new nuclear power plant designs. This project is examining the implications, for future reactors and future safety regulation, of utilizing a new risk-informed regulatory system as a replacement for the current system. This innovation will be made possible through development of a scientific, highly risk-informed approach for the design and regulation of nuclear power plants. This approach will include the development and.lor confirmation of corresponding regulatory requirements and industry standards. The major impediment to long term competitiveness of new nuclear plants in the U.S. is the capital cost component--which may need to be reduced on the order of 35% to 40% for Advanced Light Water Reactors (ALWRs) such as System 80+ and Advanced Boiling Water Reactor (ABWR). The required cost reduction for an ALWR such as AP600 or AP1000 would be expected to be less. Such reductions in capital cost will require a fundamental reevaluation of the industry standards and regulatory bases under which nuclear plants are designed and licensed. Fortunately, there is now an increasing awareness that many of the existing regulatory requirements and industry standards are not significantly contributing to safety and reliability and, therefore, are unnecessarily adding to nuclear plant costs. Not only does this degrade the economic competitiveness of nuclear energy, it results in unnecessary costs to the American electricity consumer. While addressing these concerns, this research project will be coordinated with current efforts of industry and NRC to develop risk-informed, performance-based regulations that affect the operation of the existing nuclear plants; however, this project will go farther by focusing on the design of new plants.

  5. Assessing Information Literacy among Undergraduates 71 Assessing Information Literacy

    E-Print Network [OSTI]

    California at Berkeley, University of

    of information tools as well as primary sources in molding informa- tion-solutionstotheirproblems."1 In a sub- sequent iteration of the concept, IIA dropped its reference to information re- sources being usedAssessing Information Literacy among Undergraduates 71 71 Assessing Information Literacy among

  6. COURSE INFORMATION Plant Diversity and Evolution

    E-Print Network [OSTI]

    Chen, Kuang-Yu

    and experimental tools used to understand plant diversity. 4. "Vocabulary" of plant description (see list list) 7. Distinctive features of land plant diversity 8. The history of land plants through time #12COURSE INFORMATION Fall 2009 Plant Diversity and Evolution (11:704:411) and Advanced Plant

  7. Information Technology Security Assessment Framework

    E-Print Network [OSTI]

    Federal Information Technology Security Assessment Framework November 28, 2000 Prepared (NIST) Computer Security Division #12;Overview Information and the systems that process it are among and maintain a program to adequately secure its information and system assets. Agency programs must: 1) assure

  8. Draft environmental assessment: Ocean Thermal Energy Conversion (OTEC) Pilot Plants

    SciTech Connect (OSTI)

    Sullivan, S.M.; Sands, M.D.; Donat, J.R.; Jepsen, P.; Smookler, M.; Villa, J.F.

    1981-02-01

    This Environmental Assessment (EA) has been prepared, in accordance with the National Environmental Policy Act of 1969, for the deployment and operation of a commercial 40-Megawatt (MW) Ocean Thermal Energy Conversion (OTEC) Pilot Plant (hereafter called the Pilot Plant). A description of the proposed action is presented, and a generic environment typical of the candidate Pilot Plant siting regions is described. An assessment of the potential environmental impacts associated with the proposed action is given, and the risk of credible accidents and mitigating measures to reduce these risks are considered. The Federal and State plans and policies the proposed action will encompass are described. Alternatives to the proposed action are presented. Appendix A presents the navigation and environmental information contained in the US Coast Pilot for each of the candidate sites; Appendix B provides a brief description of the methods and calculations used in the EA. It is concluded that environmental disturbances associated with Pilot Plant activities could potentially cause significant environmental impacts; however, the magnitude of these potential impacts cannot presently be assessed, due to insufficient engineering and environmental information. A site- and design-specific OTEC Pilot Plant Environmental Impact Statement (EIS) is required to resolve the potentially significant environmental effects associated with Pilot Plant deployment and operation. (WHK)

  9. Information needs for risk assessment

    SciTech Connect (OSTI)

    DeRosa, C.T.; Choudhury, H.; Schoeny, R.S.

    1990-12-31

    Risk assessment can be thought of as a conceptual approach to bridge the gap between the available data and the ultimate goal of characterizing the risk or hazard associated with a particular environmental problem. To lend consistency to and to promote quality in the process, the US Environmental Protection Agency (EPA) published Guidelines for Risk Assessment of Carcinogenicity, Developmental Toxicity, Germ Cell Mutagenicity and Exposure Assessment, and Risk Assessment of Chemical Mixtures. The guidelines provide a framework for organizing the information, evaluating data, and for carrying out the risk assessment in a scientifically plausible manner. In the absence of sufficient scientific information or when abundant data are available, the guidelines provide alternative methodologies that can be employed in the risk assessment. 4 refs., 3 figs., 2 tabs.

  10. Enterprise Assessments Review of Waste Isolation Pilot Plant...

    Office of Environmental Management (EM)

    Waste Isolation Pilot Plant Engineering and Procurement Processes - November 2015 Enterprise Assessments Review of Waste Isolation Pilot Plant Engineering and Procurement Processes...

  11. The renewable electric plant information system

    SciTech Connect (OSTI)

    Sinclair, K.

    1995-12-01

    This report explains the procedures used for creating the Renewable Electric Plant Information System (REPiS) database, describes the database fields, and summarizes the data. The REPiS database contains comprehensive information on grid-connected renewable electric generation plants in the United States. Originally designed in 1987 and updated in 1990, the database includes information through 1994. The report also illustrates ways of using the data for analysis is and describes how researchers validated the data.

  12. DOE/OIT Plant-Wide Energy Assessment Experience Summary 

    E-Print Network [OSTI]

    Olszewski, M.; Leach, R.; McElhaney, K.

    2001-01-01

    The Department of Energy (DOE) Office of Industrial Technologies (OIT) is sponsoring cost-shared, plant-wide energy assessments of industrial facilities through its BestPractices Program. The purpose of these assessments is to examine plant utility...

  13. Industrial Assessments and Why Your Plant Should Have One 

    E-Print Network [OSTI]

    Glaser, C. J.; Demetrops, J. P.

    1998-01-01

    The "in-depth" assessment of a plant site and its facilities, services and manufacturing operations can help you make your plant cleaner, more productive and more energy efficient. This paper discusses the components of a successful assessment, what...

  14. Radiological Assessment of effects from Fukushima Daiichi Nuclear Power Plant

    Broader source: Energy.gov [DOE]

    NNSA presentation on Radiological Assessment of effects from Fukushima Daiichi Nuclear Power Plant from May 13, 2011

  15. Tiger Team Assessment of the Paducah Gaseous Diffusion Plant

    SciTech Connect (OSTI)

    Not Available

    1990-07-01

    This document contains findings and concerns identified during the Tiger Team Assessment of the Department of Energy's (DOE's) Paducah Gaseous Diffusion Plant (PGDP) in Paducah, Kentucky. The assessment was directed by the Department's Office of Environment, Safety and Health (ES H) and was conducted from June 18 to July 20, 1990. The PGDP Tiger Team Assessment is comprehensive in scope. It covers the Environmental, Safety and Health (including OSHA Compliance), and Management areas and determines the site's compliance with applicable federal (including DOE), state, and local regulations and requirements. The objective of the assessment program is to provide the Secretary with information on the current ES H compliance status of DOE facilities, root causation for noncompliance, adequacy of DOE and site contractor ES H management programs, response actions to address the identified problem areas, and DOE-wide ES H compliance trends and root causes. This volume contains appendices.

  16. Tiger Team Assessment of the Pantex Plant, Amarillo, Texas

    SciTech Connect (OSTI)

    Not Available

    1990-02-01

    This document contains the findings and associated root causes identified during the Tiger Team Assessment of the Department of Energy's (DOE) Pantex Plant in Amarillo, Texas. This assessment was conducted by the Department's Office of Environment, Safety and Health between October 2 and 31, 1989. The scope of the assessment of the Pantex Plant covered all areas of environment, safety and health (ES H) activities, including compliance with federal, state, and local regulations, requirements, permits, agreements, orders and consent decrees, and DOE ES H Orders. The assessment also included an evaluation of the adequacy of DOE and site contractor ES H management programs. The draft findings were submitted to the Office of Defense Programs, the Albuquerque Operations Office, the Amarillo Area Office, and regulatory agencies at the conclusion of the on-site assessment activities for review and comment on technical accuracy. Final modifications and any other appropriate changes have been incorporated in the final report. The Tiger Team Assessment of the Pantex Plant is part of the larger Tiger Team Assessment program which will encompass over 100 DOE operating facilities. The assessment program is part of a 10-point initiative announced by Secretary of Energy James D. Watkins on June 27, 1989, to strengthen environmental protection and waste management activities in the Department. The results of the program will provide the Secretary with information on the compliance status of DOE facilities with regard to ES H requirements, root causes for noncompliance, adequacy of DOE and site contractor ES H management programs, and DOE-wide ES H compliance trends.

  17. Enterprise Assessments Review of Waste Isolation Pilot Plant...

    Office of Environmental Management (EM)

    Review of Waste Isolation Pilot Plant Engineering and Procurement Processes November 2015 Office of Nuclear Safety and Environmental Assessments Office of Environment, Safety and...

  18. Enterprise Assessments Review, Pantex Plant 2014 Full Participation...

    Broader source: Energy.gov (indexed) [DOE]

    April 2015 Review of the Pantex Plant 2014 Full Participation Exercise The Office of Emergency Management Assessments, within the U.S. Department of Energy's independent Office of...

  19. Waste Isolation Pilot Plant Technical Assessment Team Report...

    Energy Savers [EERE]

    Report Revision 0 This report provides the results of the Waste Isolation Pilot Plant (WIPP) technical assessment led by the Savannah River National Laboratory and conducted by a...

  20. Literature Review and Assessment of Plant and Animal Transfer Factors Used in Performance Assessment Modeling

    SciTech Connect (OSTI)

    Robertson, David E.; Cataldo, Dominic A.; Napier, Bruce A.; Krupka, Kenneth M.; Sasser, Lyle B.

    2003-07-20

    A literature review and assessment was conducted by Pacific Northwest National Laboratory (PNNL) to update information on plant and animal radionuclide transfer factors used in performance-assessment modeling. A group of 15 radionuclides was included in this review and assessment. The review is composed of four main sections, not including the Introduction. Section 2.0 provides a review of the critically important issue of physicochemical speciation and geochemistry of the radionuclides in natural soil-water systems as it relates to the bioavailability of the radionuclides. Section 3.0 provides an updated review of the parameters of importance in the uptake of radionuclides by plants, including root uptake via the soil-groundwater system and foliar uptake due to overhead irrigation. Section 3.0 also provides a compilation of concentration ratios (CRs) for soil-to-plant uptake for the 15 selected radionuclides. Section 4.0 provides an updated review on radionuclide uptake data for animal products related to absorption, homeostatic control, approach to equilibration, chemical and physical form, diet, and age. Compiled transfer coefficients are provided for cow’s milk, sheep’s milk, goat’s milk, beef, goat meat, pork, poultry, and eggs. Section 5.0 discusses the use of transfer coefficients in soil, plant, and animal modeling using regulatory models for evaluating radioactive waste disposal or decommissioned sites. Each section makes specific suggestions for future research in its area.

  1. Worldwide assessment of steam-generator problems in pressurized-water-reactor nuclear power plants

    SciTech Connect (OSTI)

    Woo, H.H.; Lu, S.C.

    1981-09-15

    Objective is to assess the reliability of steam generators of pressurized water reactor (PWR) power plants in the United States and abroad. The assessment is based on operation experience of both domestic and foreign PWR plants. The approach taken is to collect and review papers and reports available from the literature as well as information obtained by contacting research institutes both here and abroad. This report presents the results of the assessment. It contains a general background of PWR plant operations, plant types, and materials used in PWR plants. A review of the worldwide distribution of PWR plants is also given. The report describes in detail the degradation problems discovered in PWR steam generators: their causes, their impacts on the performance of steam generators, and the actions to mitigate and avoid them. One chapter is devoted to operating experience of PWR steam generators in foreign countries. Another discusses the improvements in future steam generator design.

  2. Springfield Processing Plant (SPP) Facility Information

    SciTech Connect (OSTI)

    Leach, Janice; Torres, Teresa M.

    2012-10-01

    The Springfield Processing Plant is a hypothetical facility. It has been constructed for use in training workshops. Information is provided about the facility and its surroundings, particularly security-related aspects such as target identification, threat data, entry control, and response force data.

  3. Privacy Impact Assessment Development and Membership Information

    E-Print Network [OSTI]

    Mathis, Wayne N.

    1 Privacy Impact Assessment Development and Membership Information I. System Identification 1. IT System Name: Development and Membership Information System (DMIS) 2. Mission Sponsor: Virginia Clark and membership. II. Privacy Assessment 1. What information is being (or will be) collected. The Development

  4. Nuclear power plant performance assessment pertaining to plant aging in France and the United States

    E-Print Network [OSTI]

    Guyer, Brittany (Brittany Leigh)

    2013-01-01

    The effect of aging on nuclear power plant performance has come under increased scrutiny in recent years. The approaches used to make an assessment of this effect strongly influence the economics of nuclear power plant ...

  5. POWER PLANT IMPACT ASSESSMENT: A SIMPLE FISHERY PRODUCTION MODEL APPROACH

    E-Print Network [OSTI]

    POWER PLANT IMPACT ASSESSMENT: A SIMPLE FISHERY PRODUCTION MODEL APPROACH ALECD. MACCALL,' KEITHR power plant entrainment mortality as a fraction (Rc) of the abundance ofthat cohort in the absence of power plant impact can be calculated by Rc = exp (-Ejtj) wheretj is the duration oflife stagei, and

  6. ASSESSMENT OF TOKAMAK PLASMA OPERATION MODES AS FUSION POWER PLANTS

    E-Print Network [OSTI]

    ASSESSMENT OF TOKAMAK PLASMA OPERATION MODES AS FUSION POWER PLANTS: THE STARLITE STUDY Farrokh of operation for a tokamak power plant and the critical plasma physics and technology issues. During for fusion power plants was made. Five different regimes of operation were considered: (1) steady

  7. Sinem Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-Enhancing Capacity forSilicium de Provence SASSinem Geothermal Power Plant Jump to:

  8. Life-cycle assessment of wastewater treatment plants

    E-Print Network [OSTI]

    Dong, Bo, M. Eng. Massachusetts Institute of Technology

    2012-01-01

    This thesis presents a general model for the carbon footprints analysis of wastewater treatment plants (WWTPs), using a life cycle assessment (LCA) approach. In previous research, the issue of global warming is often related ...

  9. An exposure assessment survey of the Mont Belvieu polyethylene plant 

    E-Print Network [OSTI]

    Tucker, Thomas Franklin

    1997-01-01

    Evaluation of ever changing, complex workplaces can be accomplished with a sound, logical exposure assessment survey (EAS). An EAS was conducted at a polyethylene plant located in southeast Texas to determine the risk of adverse health effects...

  10. Risk Informed Assessment of Regulatory and Design Requirements for Future Nuclear Power Plants (Cooperative Agreement DE-FC03-99SF21902, Am. M004) Final Technical Report

    SciTech Connect (OSTI)

    Stanley E. Ritterbusch, et. al.

    2003-01-29

    OAK-B135 Research under this project addresses the barriers to long term use of nuclear-generated electricity in the United States. It was agreed that a very basic and significant change to the current method of design and regulation was needed. That is, it was believed that the cost reduction goal could not be met by fixing the current system (i.e., an evolutionary approach) and a new, more advanced approach for this project would be needed. It is believed that a completely new design and regulatory process would have to be developed--a ''clean sheet of paper'' approach. This new approach would start with risk-based methods, would establish probabilistic design criteria, and would implement defense-in-depth only when necessary (1) to meet public policy issues (e.g., use of a containment building no matter how low the probability of a large release is) and (2) to address uncertainties in probabilistic methods and equipment performance. This new approach is significantly different from the Nuclear Regulatory Commission's (NRC) current risk-informed program for operating plants. For our new approach, risk-based methods are the primary means for assuring plant safety, whereas in the NRC's current approach, defense-in-depth remains the primary means of assuring safety. The primary accomplishments in the first year--Phase 1 were (1) the establishment of a new, highly risk-informed design and regulatory framework, (2) the establishment of the preliminary version of the new, highly risk-informed design process, (3) core damage frequency predictions showing that, based on new, lower pipe rupture probabilities, the design of the emergency core cooling system equipment can be simplified without reducing plant safety, and (4) the initial development of methods for including uncertainties in a new integrated structures-systems design model. Under the new regulatory framework, options for the use of ''design basis accidents'' were evaluated. It is expected that design basis accidents would be an inherent part of the Probabilistic Safety Assessment for the plant and their evaluation would be probabilistic. Other first year accomplishments include (1) the conversion of an NRC database for cross-referencing NRC criteria and industry codes and standards to Microsoft 2000 software, (2) an assessment of the NRC's hearing process which concluded that the normal cross-examination during public hearings is not actually required by the U.S. Administrative Procedures Act, (3) the identification and listing of reliability data sources, and (4) interfacing with other industry groups (e.g., NEI and IAEA) and NRC at workshops for risk-informing regulations. The major accomplishments during the second year consisted of (1) issuance of the final report for Subtask 1.1, ''Identify Current Applicable Regulatory Requirements [and Industry Standards],'' (2) issuance of the final report for Subtask 1.2,'' Identify Structures, Systems, and Components and Their Associate d Costs for a Typical Plant,'' (3) extension of the new, highly risk-informed design and regulatory framework to non-light-water-reactor technology, (4) completion of more detailed thermal-hydraulic and probabilistic analyses of advanced conceptual reactor system/component designs, (6) initial evaluation and recommendations for improvement of the NRC design review process, and (7) initial development of the software format, procedures and statistical routines needed to store, analyze and retrieve the available reliability data. Final reports for Subtasks 1.1 (regulatory and design criteria) and 1.2 (costs for structures, systems, and components) were prepared and issued. A final report for Subtask 1.3 (Regulatory Framework) was drafted with the aim to issue it in Phase 3 (Year 3). One technical report was produced for Subtask 1.4 (methods development) and two technical reports were produced for Subtask 1.6 (sample problem analysis). An interim report on the NRC design review process (Subtask 1.7) was prepared and issued. Finally, a report on Subtask 2.2 (database weaknesses) addressed the i

  11. Ndunga Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPI Ventures Ltd Jump to:InformationNdunga Geothermal Power Plant Jump to:

  12. Tools for Assessing Building Energy Use in Industrial Plants 

    E-Print Network [OSTI]

    Martin, M.; MacDonald, M.

    2007-01-01

    . The nature and extent of building energy assessment tools will then be profiled, and the beneficial use of an appropriate subset of these tools for assessing energy savings in buildings at industrial plants will be described. Possible future tools that may...

  13. B Plant low level waste system integrity assessment report

    SciTech Connect (OSTI)

    Walter, E.J.

    1995-09-01

    This document provides the report of the integrity assessment activities for the B Plant low level waste system. The assessment activities were in response to requirements of the Washington State Dangerous Waste Regulations, Washington Administrative Code (WAC), 173-303-640. This integrity assessment report supports compliance with Hanford Federal Facility Agreement and Consent Order interim milestone target action M-32-07-T03.

  14. AVLIS Production Plant Preliminary Quality Assurance Plan and Assessment

    SciTech Connect (OSTI)

    Not Available

    1984-11-15

    This preliminary Quality Assurance Plan and Assessment establishes the Quality Assurance requirements for the AVLIS Production Plant Project. The Quality Assurance Plan defines the management approach, organization, interfaces, and controls that will be used in order to provide adequate confidence that the AVLIS Production Plant design, procurement, construction, fabrication, installation, start-up, and operation are accomplished within established goals and objectives. The Quality Assurance Program defined in this document includes a system for assessing those elements of the project whose failure would have a significant impact on safety, environment, schedule, cost, or overall plant objectives. As elements of the project are assessed, classifications are provided to establish and assure that special actions are defined which will eliminate or reduce the probability of occurrence or control the consequences of failure. 8 figures, 18 tables.

  15. Utica Corporation Plant-Wide Energy Assessment Report Final Summary (Entrance to Utica Corporation's Whitesboro Plant)

    SciTech Connect (OSTI)

    2002-03-01

    Utica Corporation conducted a plant-wide energy assessment of the manufacturing processes and utilities at its facility in Whiteboro, NY. As a result of the assessment, the company is now implementing six energy conservation projects that will result in significant cost savings and efficiency improvements.

  16. Ryazan power plant feasibility study. Volume 2. Export trade information

    SciTech Connect (OSTI)

    Not Available

    1994-07-01

    This study was funded by the U.S. Trade and Development Agency on behalf of the Ryazan Power Plant Joint Stock Company to assess the feasibility of rehabilitating the Ryazan Power Plant in Novomichurinsk, Russia. The scope of this study includes reviewing plant equipment and operations as well as making recommendations for upgrade to present day plant standards. The main emphasis of the report is on boiler analysis, but also includes all equipment from coal entering the plant to electrical power leaving the plant. This is the second of two volumes and is divided into the following sections: (C) Technical - Sections 6-18; (D) Commercial; (E) Socioeconomic Considerations; (F) Conclusions.

  17. Plant-Wide Energy Efficiency Assessment at the Arizona Portland Cement Plant in Rillito, Arizona

    SciTech Connect (OSTI)

    Stephen J. Coppinger, P.E.; Bruce Colburn, Ph.D., P.E., CEM

    2007-05-17

    A Department of Energy Plant-wide Assessment was undertaken by Arizona Portland Cement (APC) beginning in May 2005. The assessment was performed at APC’s cement production facility in Rillito, Arizona. The assessment included a compressed air evaluation along with a detailed process audit of plant operations and equipment. The purpose of this Energy Survey was to identify a series of energy cost savings opportunities at the Plant, and provide preliminary cost and savings estimates for the work. The assessment was successful in identifying projects that could provide annual savings of over $2.7 million at an estimated capital cost of $4.3 million. If implemented, these projects could amount to a savings of over 4.9 million kWh/yr and 384,420 MMBtu/year.

  18. National Voluntary Environmental Assessment Information System (NVEAIS) Notice of Participation

    E-Print Network [OSTI]

    Voluntary Environmental Assessment Information System (NVEAIS) Notice of Participation This document identifies the agency/program and personnel participating in the National Voluntary Environmental Assessment all foodborne illness outbreak environmental assessment data into the NVEAIS. Information collected

  19. Martinez Refinery Completes Plant-Wide Energy Assessment

    SciTech Connect (OSTI)

    2002-11-01

    This OIT BestPractices Case Study describes how the Equilon Enterprises oil refinery in Martinez, California undertook a plant-wide energy assessment that focused on three key areas: waste minimization, process debottlenecking, and operations optimization. The assessment yielded recommendations, which, if implemented, can save more than 6,000,000 MMBtu per year and an estimated $52,000,000 per year, plus improve process control and reduce waste.

  20. GUIDE TO INFORMATION SECURITY TESTING AND ASSESSMENT Shirley Radack, Editor

    E-Print Network [OSTI]

    to improve their overall security. The Information Technology Laboratory of the National Institute-115, Technical Guide to Information Security Testing and Assessment: Recommendations of the National InstituteGUIDE TO INFORMATION SECURITY TESTING AND ASSESSMENT Shirley Radack, Editor Computer Security

  1. Texas Plant Disease Diagnostic Lab Information Form 

    E-Print Network [OSTI]

    Barnes, Larry W.

    2009-01-16

    : _________________________________________________ variety/cultivar: ______________________________________________ Planting date: _____________________________ % of plants affected: ____________ % of area affected on the plant: ____________ Date first noticed: _________________________ Soil p...: report unless specified ? do not notify Recent pesticide & chemical application Product name Date Fertilizer(s) Fungicide(s) Insecticide(s) Herbicide(s) Other Th e T e x a s P l a n t D i s e a s e D i a g n o st i c L a b o r a t o r y ( T P D D L...

  2. Turbocharged PFBC Power Plant Technical and Economic Assessments 

    E-Print Network [OSTI]

    Leppke, D.

    1988-01-01

    . The SOX remova 1 process is integral with the combustion process rather than a separate system subject to upsets during combustion transients. 3. NOX production is low because of the lower combustion temperatures. 4. Waste is in a dry form... POWER PLANT TECHNICAL AND ECONOMIC ASSESSMENTS DELBERT M. LEPPKE Senior Technical Manager Fluor Daniel Chicago, Illinois Fluidized bed combustion (FBC) boilers are receiving considerable attention by the utility and industrial business...

  3. An Inspector's Assessment of the New Model Safeguards Approach for Enrichment Plants

    SciTech Connect (OSTI)

    Curtis, Michael M.

    2007-07-31

    This conference paper assesses the changes that are being made to the Model Safeguards Approach for Gas Centrifuge Enrichment Plants.

  4. COMPOST INFORMATION SHEET MSU SOIL & PLANT NUTRIENT LABORATORY

    E-Print Network [OSTI]

    Isaacs, Rufus

    COMPOST INFORMATION SHEET MSU SOIL & PLANT NUTRIENT LABORATORY 1066 BOGUE ST. ROOM A81 EAST LANSING _______________________________________________________________________ SAMPLE IDENTIFICATION:___________________________ COUNTY: ________________ COMPOST TYPE: LEAF COMPOST MSW COMPOST MANURE COMPOST OTHER: (specify) ____________________________________________________ TEST

  5. Using Compost For more information on selection, planting, cultural

    E-Print Network [OSTI]

    Liskiewicz, Maciej

    Using Compost in Your Landscape For more information on selection, planting, cultural practices Conservation. Shrubs and Trees Add compost to the soil around your shrubs and trees. In late spring, place about 1 inch of compost around the plants. Cover this with a mulch of shredded pine nee- dles, straw

  6. Ryazan power plant feasibility study. Volume 1. Export trade information

    SciTech Connect (OSTI)

    Not Available

    1994-07-01

    This study was funded by the U.S. Trade and Development Agency on behalf of the Ryazan Power Plant Joint Stock Company to assess the feasibility of rehabilitating the Ryazan Power Plant in Novomichurinsk, Russia. The scope of this study includes reviewing plant equipment and operations as well as making recommendations for upgrade to present day plant standards. The main emphasis of the report is on boiler analysis, but also includes all equipment from coal entering the plant to electrical power leaving the plant. This is the first of two volumes and is divided into the following sections: (A) Abstract; (B) Evaluation of Alternative Technologies; (C) Technical: Section 1- Coal Handling, Section 2- Feeders and Pulverizers, Section 3- Boiler, Section 4- Ash Handling, Section 5- Electrostatic Precipitator.

  7. Geothermal/Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIXsource History View New Pages RecentPlant < Geothermal(Redirected from Power Plant)

  8. Building Energy Assessment Toolkit | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoop IncIowaWisconsin:PontiacInformationAssessment Toolkit Jump to: navigation,

  9. Value impact assessment: A preliminary assessment of improvement opportunities at the Quantico Central Heating Plant

    SciTech Connect (OSTI)

    Brambley, M.R.; Weakley, S.A.

    1990-09-01

    This report presents the results of a preliminary assessment of opportunities for improvement at the US Marine Corps (USMC) Quantico, Virginia, Central Heating Plant (CHP). This study is part of a program intended to provide the CHP staff with a computerized Artificial Intelligence (AI) decision support system that will assist in a more efficient, reliable, and safe operation of their plant. As part of the effort to provide the AI decision support system, a team of six scientists and engineers from the Pacific Northwest Laboratory (PNL) visited the plant to characterize the conditions and environment of the CHP. This assessment resulted in a list of potential performance improvement opportunities at the CHP. In this report, 12 of these opportunities are discussed and qualitatively analyzed. 70 refs., 7 figs., 6 tabs.

  10. $3.6 Million in Savings Identified in AMCAST Assessment: Plant-Wide Assessment Summary--Metal Casting (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2003-08-01

    Summary of AMCAST Industrial Corporation's plant-wide assessment to identify energy and cost saving opportunities at the corporation's facility in Wapakoneta, Ohio.

  11. Assessment of the Diffusive Gradients in Thin-films (DGT) technique to assess the plant availability of Mn in soils.

    E-Print Network [OSTI]

    Mundus, Simon; Husted, Søren; Lombi, Enzo

    2009-01-01

    predicts copper availability to plants. EnvironmentalAttempts to assess Mn availability have been impeded due towill influence the Mn availability. Often flooding of soils

  12. Initial Activation Assessment for ARIES Compact Stellarator Power Plant

    SciTech Connect (OSTI)

    El-Guebaly, L.; Wilson, P.; Paige, D. [University of Wisconsin, Fusion Technology Institute (United States)] (and others)

    2005-04-15

    As the safety assessment frequently requires knowledge of the activation parameters, we estimated the highest possible activity, decay heat, and waste disposal rating on the time scale after shutdown for the compact stellarator power plant ARIES-CS. We selected two widely different systems employing SiC/SiC composites and low-activation ferritic steel (FS) as structural materials. Our results show that components of both systems qualify as Class C low-level waste (LLW) at the end of a 100 y storage period following the decommissioning of the plant. The SiC blanket, vacuum vessel, and magnet offer very low waste disposal rating to the extent that a Class A LLW seems achievable for these components. On this last point, we discussed the split between the Class A and Class C wastes, emphasizing our motivation to lower the level of ARIES-CS radioactive waste.

  13. Sibayak Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-Enhancing Capacity for LowInformationShoshone County,Si Brilliant

  14. Mataloko Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas:Montezuma,InformationIllinois:Martin,Open Energy InformationMastic,Mataloko

  15. Georgia-Pacific Palatka Plant Uses Thermal Pinch Analysis and Evaluates Water Reduction in Plant-Wide Energy Assessment

    SciTech Connect (OSTI)

    2002-12-01

    This OIT BestPractices Case Study describes the methods and results used in a plant-wide assessment at a Georgia-Pacific paper mill in Palatka, FL. Assessment personnel recommended several projects, which, if implemented, have the potential to save the plant more than 729,000 MMBtu per year and $2.9 million per year. In addition, the plant could reduce water use by 2,100 gallons per minute.

  16. Developing and assessing accident management plans for nuclear power plants

    SciTech Connect (OSTI)

    Hanson, D.J.; Johnson, S.P.; Blackman, H.S.; Stewart, M.A. (EG and G Idaho, Inc., Idaho Falls, ID (United States))

    1992-07-01

    This document is the second of a two-volume NUREG/CR that discusses development of accident management plans for nuclear power plants. The first volume (a) describes a four-phase approach for developing criteria that could be used for assessing the adequacy of accident management plans, (b) identifies the general attributes of accident management plans (Phase 1), (c) presents a prototype process for developing and implementing severe accident management plans (Phase 2), and (d) presents criteria that can be used to assess the adequacy of accident management plans. This volume (a) describes results from an evaluation of the capabilities of the prototype process to produce an accident management plan (Phase 3) and (b), based on these results and preliminary criteria included in NUREG/CR-5543, presents modifications to the criteria where appropriate.

  17. Plant Nematode Detection Laboratory Information Sheet 

    E-Print Network [OSTI]

    Barnes, Larry W.

    2009-01-16

    /cultivar: _____________________________ Planting date: ____________________ Date first noticed: _________________________ Soil pH: __________________ Problem developed: ? Suddenly ? Gradually If you have consulted other labs, what was concluded... date ______________________________________________________ ? AgriLife Extension personnel exempted The T e x a s P l a n t D i s e a s e D i a g n o st i c L a b o r a t o r y ( T P D D L ) i s a s er v i c e t o t h e p e o p l e o f T e x a s b y...

  18. Germencik Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainable UrbanKentucky:BoreOpen EnergyGermencik Geothermal Power Plant Jump to:

  19. Mecca Plant Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland: Energy Resources Jump to:Electric Coop, IncSouth Dakota:Mebane, NorthPlant

  20. Irem Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas: Energy ResourcesOrder at 8, 13RenewableIrem Geothermal Power Plant Jump to:

  1. Niigata Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPI VenturesNew Hampshire: Energy ResourcesNiigata Geothermal Power Plant Jump

  2. Coal Power Plant Database | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoopButtePower Ventures Jump to: navigation, searchClover Hill HighPower Plant Database

  3. Cemex River Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoopButte County,Camilla,Thermal Gradient Holes JumpHills WindBlack MountainRiver Plant

  4. Pantex Plant Wind Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIXsourceII JumpQuarterly Smart GridNorth Carolina: EnergyIncPan AfricanHomePantex Plant

  5. Geothermal/Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainable UrbanKentucky:Bore TechnologiesAssessment InsettingGrid

  6. Aalborg Universitet An assessment of converter modelling needs for offshore wind power plants

    E-Print Network [OSTI]

    Bak, Claus Leth

    Aalborg Universitet An assessment of converter modelling needs for offshore wind power plants). An assessment of converter modelling needs for offshore wind power plants connected via VSC-HVDC networks Power into Power Systems as well as on Transmission Networks for Offshore Wind Plants. Energynautics

  7. Geothermal Steam Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainable UrbanKentucky:Bore TechnologiesAssessment In HawaiiSalton Trough

  8. Yamagawa Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEtGeorgia:Illinois:Wizard PowerWyandanch, New1991)Yalesville,YamagawaYamagawa

  9. Yangbajain Geothrmal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEtGeorgia:Illinois:Wizard PowerWyandanch,Yamhill,

  10. Wairakei Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEt Al.,Turin,Village ofWaialua, Hawaii: Energy

  11. Tuzla Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEt Al.,Turin, New York: Energy Resources JumpTuscaloosaITustin,Tuzla

  12. Sumikawa Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-Enhancing CapacityVectren)Model for the Entire CountryPennsylvania:SulphurSumikawa

  13. Mutnovskaya Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland: EnergyInformationOliver,Minnesota: EnergyMustang, Oklahoma:Mutnovskaya

  14. Maibarara Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas:Montezuma,Information MHKMHK5 <Kentucky:York:Texas:MahnomenMaia

  15. Matsukawa Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas:Montezuma,InformationIllinois:Martin,Open EnergyMathews County,Matla

  16. Zunil Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEtGeorgia:Illinois:WizardYates County,Zena, NewZhuluZipZoneZoloZuniZunil

  17. Uenotai Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEt Al.,Turin, New York: EnergyU.S. EPA RegionforUStoNRCS

  18. Ulumbu Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEt Al.,Turin, New York: EnergyU.S. EPAEnergyUltra HighUlubelu2 Jump

  19. Takigami Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-Enhancing CapacityVectren)Model forTechnologies95Symerton,EEconomies inTakigami

  20. Mori Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland: EnergyInformation MontanaOhio:Hill, California: EnergyMori Geothermal

  1. Onuma Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPI VenturesNewSt.Information OlindaOnslow County, NorthOntonagon

  2. Wave Power Plant Inc | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EA EISTJThinWarsaw, Poland:Energy InformationWausau High SchoolInc Jump

  3. Alasehir Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EAand DaltonSolarOpen EnergyFebruaryInformationAlamedaCounty,Alasehir

  4. Amatitlan Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EAand DaltonSolarOpen5AllEnergy Information AmanaAmatitlan

  5. Binary Cycle Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental JumpInformation BeaufortBentMichigan:Greece)Daddy sEnergyJump

  6. Bjarnaflag Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental JumpInformationBio-Gas Technologies, LLCMichigan: EnergyBixby,Bjarnaflag

  7. Brawley Power Plant Abandoned | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoop IncIowaWisconsin:Pontiac BiomassInformationSystemsBradfieldBravo Wind Jump

  8. Bayer Polymers: Plant Identifies Numerous Projects Following Plant-Wide Energy-Efficient Assessment

    SciTech Connect (OSTI)

    2003-08-01

    The Bayer Corporation undertook a plant-wide energy efficiency assessment of its New Martinsville, West Virginia, plant in 2001. The objectives were to identify energy saving projects in the utilities area. The projects, when complete, will save the company the loss of an estimated 236,000 MMBtu ($1.16 million) annually in energy from burning and leaking fossil fuels. Certain other projects will save the company 6,300,000 kWh ($219,000) of electrical energy each year. All of the projects could be duplicated in other chemical manufacturing facilities and most of the projects could be duplicated in other industries utilizing steam, pumps, and/or compressed air.

  9. 3M: Hutchinson Plant Focuses on Heat Recovery and Cogeneration During Plant-Wide Energy-Efficiency Assessment

    SciTech Connect (OSTI)

    Not Available

    2003-06-01

    3M performed a plant-wide energy efficiency assessment at its Hutchinson, Minnesota, plant to identify energy- and cost-saving opportunities. Assessment staff developed four separate implementation packages that represented various combinations of energy-efficiency projects involving chiller consolidation, air compressor cooling improvements, a steam turbine used for cogeneration, and a heat recovery boiler for two of the plant's thermal oxidizers. Staff estimated that the plant could save 6 million kWh/yr in electricity and more than 200,000 MMBtu/yr in natural gas and fuel oil, and avoid energy costs of more than$1 million during the first year.

  10. Assessing the costs of solar power plants for the Island of Roatàn

    E-Print Network [OSTI]

    Huwe, Ethan (Ethan L.)

    2011-01-01

    This is an analysis assessing the installation costs of different solar power plant technologies and the current commercial availability for installation on the Island or Roatàn. Commercial large-scale power plants have ...

  11. Assessment of Interdependencies between Communication and Information Technology

    E-Print Network [OSTI]

    Assessment of Interdependencies between Communication and Information Technology Infrastructure, oil and gas networks, transportation, financial ser- vices, etc. Over the years, integration

  12. Information Foraging in Nuclear Power Plant Control Rooms

    SciTech Connect (OSTI)

    R.L. Boring

    2011-09-01

    nformation foraging theory articulates the role of the human as an 'informavore' that seeks information and follows optimal foraging strategies (i.e., the 'information scent') to find meaningful information. This paper briefly reviews the findings from information foraging theory outside the nuclear domain and then discusses the types of information foraging strategies operators employ for normal and off-normal operations in the control room. For example, operators may employ a predatory 'wolf' strategy of hunting for information in the face of a plant upset. However, during routine operations, the operators may employ a trapping 'spider' strategy of waiting for relevant indicators to appear. This delineation corresponds to information pull and push strategies, respectively. No studies have been conducted to determine explicitly the characteristics of a control room interface that is optimized for both push and pull information foraging strategies, nor has there been empirical work to validate operator performance when transitioning between push and pull strategies. This paper explores examples of control room operators as wolves vs. spiders and con- cludes by proposing a set of research questions to investigate information foraging in control room settings.

  13. Assessement of Codes and Standards Applicable to a Hydrogen Production Plant Coupled to a Nuclear Reactor

    SciTech Connect (OSTI)

    M. J. Russell

    2006-06-01

    This is an assessment of codes and standards applicable to a hydrogen production plant to be coupled to a nuclear reactor. The result of the assessment is a list of codes and standards that are expected to be applicable to the plant during its design and construction.

  14. September 4-5, 2008/ARR TRL Assessment of Fusion Power Plant

    E-Print Network [OSTI]

    Raffray, A. René

    September 4-5, 2008/ARR 1 TRL Assessment of Fusion Power Plant Subsystems A. René Raffray of tritium throughout the entire plant, including breeding and recovery. 12. Power Extraction: Understand how the readiness level of the blanket subsystem for a fusion power plant (DEMO and beyond) · In order to develop

  15. ASSESSMENT OF OPTIONS FOR ATTRACTIVE COMMERCIAL AND DEMONSTRATION TOKAMAK FUSION POWER PLANTS

    E-Print Network [OSTI]

    ASSESSMENT OF OPTIONS FOR ATTRACTIVE COMMERCIAL AND DEMONSTRATION TOKAMAK FUSION POWER PLANTS Power Plant based on toka- mak confinement concept. It is obvious that the Fusion Demo should demonstrate that a commercial fusion power plant would be accepted by utility and industry (i

  16. Initial Maintenance Assessment for ARIES-CS Power Plant X. R. Wang, S. Malang

    E-Print Network [OSTI]

    Raffray, A. René

    Initial Maintenance Assessment for ARIES-CS Power Plant X. R. Wang, S. Malang a , A. R. Raffray that will result in the detailed design study of a compact stellarator power plant. The first year engineering and maintenance scheme is quite challenging for a compact stellerator power plant because of the helical plasma

  17. Web-based Tool for Preliminary Assessment of Wind Power Plant Design

    E-Print Network [OSTI]

    Borissova, Daniela

    Web-based Tool for Preliminary Assessment of Wind Power Plant Design Daniela Borissova1 and Ivan. Designing of reliable and cost-effective industrial wind power plant is a prerequisite for the effective use of wind power as an alternative resource. The design of a wind power plant includes the determination

  18. West Point Treatment Plant Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEtGeorgia: Energy Resources JumpChicago,Islip,Point Treatment Plant Biomass

  19. Information resource use and need in risk assessment

    SciTech Connect (OSTI)

    Turturro, A.

    1990-12-31

    The manner in which the Food and Drug Administration (FDA) uses information resources comprises an interesting illustration of federal agency information use. A description of the context in which risk assessment occurs within the FDA is followed by a discussion of information access and use, as well as a practical example.

  20. Privacy Impact Assessment (PIA) NMAH Collections Information System

    E-Print Network [OSTI]

    Mathis, Wayne N.

    Privacy Impact Assessment (PIA) NMAH Collections Information System I. System Identification 1. IT System Name: MIMSY XG Collections Information System (CIS) 2. IT System Sponsor: National Museum Museum of American History (NMAH) Collection Information System (CIS) uses the MIMSY XG database

  1. Aging assessment of surge protective devices in nuclear power plants

    SciTech Connect (OSTI)

    Davis, J.F.; Subudhi, M.; Carroll, D.P.

    1996-01-01

    An assessment was performed to determine the effects of aging on the performance and availability of surge protective devices (SPDs), used in electrical power and control systems in nuclear power plants. Although SPDs have not been classified as safety-related, they are risk-important because they can minimize the initiating event frequencies associated with loss of offsite power and reactor trips. Conversely, their failure due to age might cause some of those initiating events, e.g., through short circuit failure modes, or by allowing deterioration of the safety-related component(s) they are protecting from overvoltages, perhaps preventing a reactor trip, from an open circuit failure mode. From the data evaluated during 1980--1994, it was found that failures of surge arresters and suppressers by short circuits were neither a significant risk nor safety concern, and there were no failures of surge suppressers preventing a reactor trip. Simulations, using the ElectroMagnetic Transients Program (EMTP) were performed to determine the adequacy of high voltage surge arresters.

  2. Celanese Chemicals Clear Lake Plant Energy Projects Assessment and Implementation 

    E-Print Network [OSTI]

    Weber, J.

    2000-01-01

    The Clear Lake Plant of Celanese Chemicals has implemented a strategy to reduce energy consumption. The plant identified, designed, and completed several projects to improve its chemical production processes. These projects reduce steam use, fuel...

  3. Use of probabilistic risk assessment (PRA) in expert systems to advise nuclear plant operators and managers

    SciTech Connect (OSTI)

    Uhrig, R.E.

    1988-01-01

    The use of expert systems in nuclear power plants to provide advice to managers, supervisors and/or operators is a concept that is rapidly gaining acceptance. Generally, expert systems rely on the expertise of human experts or knowledge that has been modified in publications, books, or regulations to provide advice under a wide variety of conditions. In this work, a probabilistic risk assessment (PRA)/sup 3/ of a nuclear power plant performed previously is used to assess the safety status of nuclear power plants and to make recommendations to the plant personnel. 5 refs., 1 fig., 2 tabs.

  4. An Information Visualization Approach to Intelligent Building Assessment 

    E-Print Network [OSTI]

    Hong, J.; Chen, Z.; Li, H.; Xu, Q.

    2006-01-01

    toolkit for IB assessment using Microsoft Office (called IB-Radar and IB-Compass), and a Geographical Information System (GIS) toolkit for bridging knowledge (called IB-GIS) in IB assessment, etc. A case study is used to demonstrate how the KIV approach...

  5. DRAFT. ENVIRONMENTAL ASSESSMENT OCEAN THERMAL ENERGY CONVERSION (OTEC) PILOT PLANTS

    E-Print Network [OSTI]

    Sullivan, S.M.

    2014-01-01

    fauna associated with offshore platforms in Mexico. Fish.aspects of siting OTEC plants offshore the United States onthe high seas, and offshore other countries. In G. L.

  6. ENVIRONMENTAL ASSESSMENT OCEAN THERMAL ENERGY CONVERSION (OTEC) PILOT PLANTS

    E-Print Network [OSTI]

    Sullivan, S.M.

    2014-01-01

    fauna associated with offshore platforms in the northeasternaspects of siting OTEC plants offshore the United States onthe high seas, and offshore other countries. In G. L.

  7. National Voluntary Environmental Assessment Information System (NVEAIS) State Notice and Acknowledgment of Local Participation

    E-Print Network [OSTI]

    Voluntary Environmental Assessment Information System (NVEAIS) State Notice and Acknowledgment of Local/program) _______________________________ in the National Voluntary Environmental Assessment Information System (NVEAIS) of the National Center all foodborne illness outbreak environmental assessment data to the system. Information collected

  8. Kizildere I Geothermal Pwer Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas: Energy ResourcesOrderInformationKizildere I Geothermal Pwer Plant Jump to:

  9. Kizildere II Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas: Energy ResourcesOrderInformationKizildere I Geothermal Pwer Plant Jump to:II

  10. Industrial Plant Services Australia Pty Ltd IPS | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas: Energy ResourcesOrder at 8, 13 (Vt. WaterInformationPlant Services Australia Pty

  11. Neal Hot Springs Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPI Ventures Ltd Jump to:InformationNdunga Geothermal Power Plant JumpNeal

  12. Olkaria I Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPI VenturesNewSt.Information Olinda Landfill GasI Geothermal Power Plant

  13. Olkaria II Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPI VenturesNewSt.Information Olinda Landfill GasI Geothermal Power PlantII

  14. North Brawley Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIXsourceII Jump to:Information 3rd| Open EnergyAndover, Massachusetts: EnergyPlant Jump

  15. PROBABILISTIC SAFETY ASSESSMENT OF OPERATIONAL ACCIDENTS AT THE WASTE ISOLATION PILOT PLANT

    SciTech Connect (OSTI)

    Rucker, D.F.

    2000-09-01

    This report presents a probabilistic safety assessment of radioactive doses as consequences from accident scenarios to complement the deterministic assessment presented in the Waste Isolation Pilot Plant (WIPP) Safety Analysis Report (SAR). The International Council of Radiation Protection (ICRP) recommends both assessments be conducted to ensure that ''an adequate level of safety has been achieved and that no major contributors to risk are overlooked'' (ICRP 1993). To that end, the probabilistic assessment for the WIPP accident scenarios addresses the wide range of assumptions, e.g. the range of values representing the radioactive source of an accident, that could possibly have been overlooked by the SAR. Routine releases of radionuclides from the WIPP repository to the environment during the waste emplacement operations are expected to be essentially zero. In contrast, potential accidental releases from postulated accident scenarios during waste handling and emplacement could be substantial, which necessitates the need for radiological air monitoring and confinement barriers (DOE 1999). The WIPP Safety Analysis Report (SAR) calculated doses from accidental releases to the on-site (at 100 m from the source) and off-site (at the Exclusive Use Boundary and Site Boundary) public by a deterministic approach. This approach, as demonstrated in the SAR, uses single-point values of key parameters to assess the 50-year, whole-body committed effective dose equivalent (CEDE). The basic assumptions used in the SAR to formulate the CEDE are retained for this report's probabilistic assessment. However, for the probabilistic assessment, single-point parameter values were replaced with probability density functions (PDF) and were sampled over an expected range. Monte Carlo simulations were run, in which 10,000 iterations were performed by randomly selecting one value for each parameter and calculating the dose. Statistical information was then derived from the 10,000 iteration batch, which included 5%, 50%, and 95% dose likelihood, and the sensitivity of each assumption to the calculated doses. As one would intuitively expect, the doses from the probabilistic assessment for most scenarios were found to be much less than the deterministic assessment. The lower dose of the probabilistic assessment can be attributed to a ''smearing'' of values from the high and low end of the PDF spectrum of the various input parameters. The analysis also found a potential weakness in the deterministic analysis used in the SAR, a detail on drum loading was not taken into consideration. Waste emplacement operations thus far have handled drums from each shipment as a single unit, i.e. drums from each shipment are kept together. Shipments typically come from a single waste stream, and therefore the curie loading of each drum can be considered nearly identical to that of its neighbor. Calculations show that if there are large numbers of drums used in the accident scenario assessment, e.g. 28 drums in the waste hoist failure scenario (CH5), then the probabilistic dose assessment calculations will diverge from the deterministically determined doses. As it is currently calculated, the deterministic dose assessment assumes one drum loaded to the maximum allowable (80 PE-Ci), and the remaining are 10% of the maximum. The effective average of drum curie content is therefore less in the deterministic assessment than the probabilistic assessment for a large number of drums. EEG recommends that the WIPP SAR calculations be revisited and updated to include a probabilistic safety assessment.

  16. Risk assessment activities at NIOSH: Information resources and needs

    SciTech Connect (OSTI)

    Stayner, L.T.; Meinhardt, T.; Hardin, B.

    1990-12-31

    Under the Occupational Safety and Health, and Mine Safety and Health Acts, the National Institute for Occupational Safety and Health (NIOSH) is charged with development of recommended occupational safety and health standards, and with conducting research to support the development of these standards. Thus, NIOSH has been actively involved in the analysis of risk associated with occupational exposures, and in the development of research information that is critical for the risk assessment process. NIOSH research programs and other information resources relevant to the risk assessment process are described in this paper. Future needs for information resources are also discussed.

  17. Commonwealth Aluminum: Manufacturer Conducts Plant-Wide Energy Assessments at Two Aluminum Sheet Production Operations

    Broader source: Energy.gov [DOE]

    This case study describes how Commonwealth Industries (now Aleris Rolled Products) conducted plant-wide energy assessments at its aluminum sheet rolling mills in Lewisport, Kentucky, and Uhrichsville, Ohio, to improve process and energy efficiency.

  18. Assessment of Potential Benzene Contamination of the Ogallala Aquifer at the Pantex Plant, Texas

    E-Print Network [OSTI]

    Hazen, Terry

    Assessment of Potential Benzene Contamination of the Ogallala Aquifer at the Pantex Plant, Texas (near detection limits) concentrations of volatile organic compounds including benzene, toluene (MCL), measured concentrations of benzene were near or exceeded MCL values. Based on concerns raised

  19. Transportation Assessment Toolkit | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LIST OFAMERICA'SHeavyAgencyTendo New EnergyWind Power Co Ltd JumpAssessment Toolkit

  20. Land Use Assessment Toolkit | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LISTStar2-0057-EAInvervar HydroElectricColorado: EnergyLamartine NavarroAssessment

  1. Wind Resource Assessment Overview | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoop IncIowa (Utility Company)Idaho)VosslohWestConnecticut: EnergyWindAssessment

  2. Wind Resource Assessment | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoop IncIowa (Utility Company)Idaho)VosslohWestConnecticut: EnergyWindAssessmentWind

  3. Impact Assessment Toolkit | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LIST OFAMERICA'SHeavy ElectricalsFTLTechnologySA Jump to:Impact Assessment Toolkit

  4. Biennial Assessment of the Fifth Power Plan Gas Turbine Power Plant Planning Assumptions

    E-Print Network [OSTI]

    from the heat recovery steam generator powers an additional steam turbine, providing extra electricBiennial Assessment of the Fifth Power Plan Gas Turbine Power Plant Planning Assumptions October 17, 2006 Simple- and combined-cycle gas turbine power plants fuelled by natural gas are among the bulk

  5. Environmental assessment and finding of no significant impact: Biorecycling Technologies, Inc., Noble Biogas and Fertilizer Plant, Fresno County, California

    SciTech Connect (OSTI)

    NONE

    1997-09-01

    The US Department of Energy (DOE) is considering a proposal from the California Energy Commission for partial funding up to $1,500,000 of the construction of the biorecycling Technologies, Inc., (BTI) Noble Biogas and Fertilizer Plant in Fresno County, California. BTI along with its contractors and business partners would develop the plant, which would use manure and green waste to produce biogas and a variety of organic fertilizer products. The California Energy Commission has requested funding from the DOE Commercialization Ventures program to assist in the construction of the plant, which would produce up to one megawatt of electricity by burning biogas in a cogeneration unit. The purpose of this environmental assessment (EA) is to provide DOE and the public with information on potential environmental impacts associated with funding development of the proposed project.

  6. Enterprise Assessments Review, Pantex Plant 2014 Full Participation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum12, 2015 Infographiclighbulbs -Immobilization PlantPlant - January 20152014

  7. Enterprise Assessments Review, Waste Isolation Pilot Plant - December

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum12, 2015 Infographiclighbulbs -Immobilization PlantPlant - January2014 |

  8. DOE's New Checklist Helps Plants Assess Energy Management Activities...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assess Energy Management Activities May 14, 2014 - 11:40am Addthis DOE developed the Strategic Energy Management Checklist to help manufacturing facilities conduct a...

  9. Pulmonary and gastric lead burden assessment for lead-recycling plant , J.J Sauvain2

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    1 Pulmonary and gastric lead burden assessment for lead-recycling plant workers Uzu, G.1 , J Chimiques des Métaux, 30 Avenue de Fondeyre 31200 Toulouse, France Key words: bioaccessibility, DTT, lead) and origin (furnace, refining and channeled emissions), lead toxicity and bioaccessibility assessment were

  10. Combined Fire Hazards Analysis/Assessment, Building 9116- Y12 Plant, Oak Ridge, Tennessee

    Broader source: Energy.gov [DOE]

    This assessment/analysis is intended to provide a comprehensive evaluation of the risks from fire and fire related perils in Building 9116 at the Oak Ridge Y-12 Plant. The assessment/analysis has been prepared in accordance with the criteria listed in DOE Order 5480.7A.

  11. Regional flood hazard assessment of the Paducah and Portsmouth Gaseous Diffusion Plants

    SciTech Connect (OSTI)

    Johnson, R.O.; Wang, J.C.; Lee, D.W.

    1991-01-01

    Regional flood-hazard assessments performed for the Paducah and Portsmouth Gaseous Diffusion Plants are reviewed, compared, and contrasted to determine the relationship of probable maximum flood methodology with respect to US Department of Energy design and evaluation guidelines. The Paducah assessment was carried out using probable maximum flood methodology, while the Portsmouth assessment utilized probabilistic techniques. Results indicated that regional flooding along nearby rivers would not inundate either plant, and that the guidelines were satisfied. A comparison of results indicated that the probable maximum flood recurrence interval associated with the Paducah assessment exceeded the 10,000 years depending on the choice of the probabilistic model used to perform the assessment. It was concluded, based on an analysis of two data points, that smaller watersheds driven by single event storms could be assessed using probabilistic techniques, while probable maximum flood methodology could be applied to larger drainage basins flooded by storm sequences. 32 refs., 3 figs.

  12. Historical Exposures to Chemicals at the Rocky Flats Nuclear Weapons Plant: A Pilot Retrospective Exposure Assessment

    SciTech Connect (OSTI)

    Janeen Denise Robertson

    1999-02-01

    In a mortality study of white males who had worked at the Rocky Flats Nuclear Weapons Plant between 1952 and 1979, an increased number of deaths from benign and unspecified intracranial neoplasms was found. A case-control study nested within this cohort investigated the hypothesis that an association existed between brain tumor death and exposure to either internally deposited plutonium or external ionizing radiation. There was no statistically significant association found between estimated radiation exposure from internally deposited plutonium and the development of brain tumors. Exposure by job or work area showed no significant difference between the cohort and the control groups. An update of the study found elevated risk estimates for (1) all lymphopoietic neoplasms, and (2) all causes of death in employees with body burdens greater than or equal to two nanocuries of plutonium. There was an excess of brain tumors for the entire cohort. Similar cohort studies conducted on worker populations from other plutonium handling facilities have not yet shown any elevated risks for brain tumors. Historically, the Rocky Flats Nuclear Weapons Plant used large quantities of chemicals in their production operations. The use of solvents, particularly carbon tetrachloride, was unique to Rocky Flats. No investigation of the possible confounding effects of chemical exposures was done in the initial studies. The objectives of the present study are to (1) investigate the history of chemical use at the Rocky Flats facility; (2) locate and analyze chemical monitoring information in order to assess employee exposure to the chemicals that were used in the highest volume; and (3) determine the feasibility of establishing a chemical exposure assessment model that could be used in future epidemiology studies.

  13. The application of Plant Reliability Data Information System (PRINS) to CANDU reactor

    SciTech Connect (OSTI)

    Hwang, S. W.; Lim, Y. H.; Park, H. C.

    2012-07-01

    As risk-informed applications (RIAs) are actively implanted in the nuclear industry, an issue associated with technical adequacy of Probabilistic Safety Assessment (PSA) arises in its modeling and data sourcing. In Korea, PSA for all Korean NPPs has been completed and KHNP(Korea Hydro and Nuclear Power Plant Company) developed the database called the Plant Reliability Data Information System (PRinS). It has several characteristics that distinguish it from other database system such as NPRDs (INPO,1994), PRIS (IAEA), and SRDF (EdF). This database has the function of systematic data management such as automatic data-gathering, periodic data deposition and updating, statistical analysis including Bayesian method, and trend analysis of failure rate or unavailability. In recent PSA for CANDU reactor, the component failure data of EPRI ALWR URD and Component Reliability Database were preferentially used as generic data set. The error factor for most component failure data was estimated by using the information NUREG/CR-4550 and NUREG/CR-4639. Also, annual trend analysis was performed for the functional losses of components using the statistical analysis and chart module of PRinS. Furthermore, the database has been updated regularly and maintained as a living program to reflect the current status. This paper presents the failure data analysis using PRinS which provides Bayesian analysis on main components in the CANDU reactor. (authors)

  14. Direct-flash-steam geothermal-power-plant assessment. Final report

    SciTech Connect (OSTI)

    Alt, T.E.

    1982-01-01

    The objective of the project was to analyze the capacity and availability factors of an operating direct flash geothermal power plant. The analysis was to include consideration of system and component specifications, operating procedures, maintenance history, malfunctions, and outage rate. The plant studied was the 75 MW(e) geothermal power plant at Cerro Prieto, Mexico, for the years 1973 to 1979. To describe and assess the plant, the project staff reviewed documents, visited the plant, and met with staff of the operating utility. The high reliability and availability of the plant was documented and actions responsible for the good performance were identified and reported. The results are useful as guidance to US utilities considering use of hot water geothermal resources for power generation through a direct flash conversion cycle.

  15. AN ASSESSMENT OF THE BRAYTON CYCLE FOR HIGH PERFORMANCE POWER PLANTS R. Schleicher A. R. Raffray C. P. Wong

    E-Print Network [OSTI]

    Raffray, A. René

    AN ASSESSMENT OF THE BRAYTON CYCLE FOR HIGH PERFORMANCE POWER PLANTS R. Schleicher A. R. Raffray C examines in detail these parameters and proposes near-term values for fusion power plant studies based of helium CCGTs to fusion power plants. This paper explores fusion plant performance that could be achieved

  16. Independent Oversight Assessment, Pantex Plant - November 2012 | Department

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i nA Guide toIMPROVEMENT OF DESIGN CODESImmobilization PlantMay 5-7,|Wasteof

  17. Waste Isolation Pilot Plant Technical Assessment Team Report Revision 0 |

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LIST OFAMERICA'S FUTURE. regulators consumerWaste Isolation Pilot Plant

  18. Integrated deterministic and probabilistic safety analysis for safety assessment of nuclear power plants

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Di Maio, Francesco; Zio, Enrico; Smith, Curtis; Rychkov, Valentin

    2015-07-06

    The present special issue contains an overview of the research in the field of Integrated Deterministic and Probabilistic Safety Assessment (IDPSA) of Nuclear Power Plants (NPPs). Traditionally, safety regulation for NPPs design and operation has been based on Deterministic Safety Assessment (DSA) methods to verify criteria that assure plant safety in a number of postulated Design Basis Accident (DBA) scenarios. Referring to such criteria, it is also possible to identify those plant Structures, Systems, and Components (SSCs) and activities that are most important for safety within those postulated scenarios. Then, the design, operation, and maintenance of these “safety-related” SSCs andmore »activities are controlled through regulatory requirements and supported by Probabilistic Safety Assessment (PSA).« less

  19. Risk-informed incident management for nuclear power plants

    E-Print Network [OSTI]

    Smith, Curtis Lee, 1966-

    2002-01-01

    Decision making as a part of nuclear power plant operations is a critical, but common, task. Plant management is forced to make decisions that may have safety and economic consequences. Formal decision theory offers the ...

  20. Approaches to cancer assessment in EPA's Integrated Risk Information System

    SciTech Connect (OSTI)

    Gehlhaus, Martin W.; Gift, Jeffrey S.; Hogan, Karen A.; Kopylev, Leonid; Schlosser, Paul M.; Kadry, Abdel-Razak

    2011-07-15

    The U.S. Environmental Protection Agency's (EPA) Integrated Risk Information System (IRIS) Program develops assessments of health effects that may result from chronic exposure to chemicals in the environment. The IRIS database contains more than 540 assessments. When supported by available data, IRIS assessments provide quantitative analyses of carcinogenic effects. Since publication of EPA's 2005 Guidelines for Carcinogen Risk Assessment, IRIS cancer assessments have implemented new approaches recommended in these guidelines and expanded the use of complex scientific methods to perform quantitative dose-response assessments. Two case studies of the application of the mode of action framework from the 2005 Cancer Guidelines are presented in this paper. The first is a case study of 1,2,3-trichloropropane, as an example of a chemical with a mutagenic mode of carcinogenic action thus warranting the application of age-dependent adjustment factors for early-life exposure; the second is a case study of ethylene glycol monobutyl ether, as an example of a chemical with a carcinogenic action consistent with a nonlinear extrapolation approach. The use of physiologically based pharmacokinetic (PBPK) modeling to quantify interindividual variability and account for human parameter uncertainty as part of a quantitative cancer assessment is illustrated using a case study involving probabilistic PBPK modeling for dichloromethane. We also discuss statistical issues in assessing trends and model fit for tumor dose-response data, analysis of the combined risk from multiple types of tumors, and application of life-table methods for using human data to derive cancer risk estimates. These issues reflect the complexity and challenges faced in assessing the carcinogenic risks from exposure to environmental chemicals, and provide a view of the current trends in IRIS carcinogenicity risk assessment.

  1. Soil-to-Plant Concentration Ratios for Assessing Food Chain Pathways in Biosphere Models

    SciTech Connect (OSTI)

    Napier, Bruce A.; Fellows, Robert J.; Krupka, Kenneth M.

    2007-10-01

    This report describes work performed for the U.S. Nuclear Regulatory Commission’s project Assessment of Food Chain Pathway Parameters in Biosphere Models, which was established to assess and evaluate a number of key parameters used in the food-chain models used in performance assessments of radioactive waste disposal facilities. Section 2 of this report summarizes characteristics of samples of soils and groundwater from three geographical regions of the United States, the Southeast, Northwest, and Southwest, and analyses performed to characterize their physical and chemical properties. Because the uptake and behavior of radionuclides in plant roots, plant leaves, and animal products depends on the chemistry of the water and soil coming in contact with plants and animals, water and soil samples collected from these regions of the United States were used in experiments at Pacific Northwest National Laboratory to determine radionuclide soil-to-plant concentration ratios. Crops and forage used in the experiments were grown in the soils, and long-lived radionuclides introduced into the groundwater provide the contaminated water used to water the grown plants. The radionuclides evaluated include 99Tc, 238Pu, and 241Am. Plant varieties include alfalfa, corn, onion, and potato. The radionuclide uptake results from this research study show how regional variations in water quality and soil chemistry affect radionuclide uptake. Section 3 summarizes the procedures and results of the uptake experiments, and relates the soil-to-plant uptake factors derived. In Section 4, the results found in this study are compared with similar values found in the biosphere modeling literature; the study’s results are generally in line with current literature, but soil- and plant-specific differences are noticeable. This food-chain pathway data may be used by the NRC staff to assess dose to persons in the reference biosphere (e.g., persons who live and work in an area potentially affected by radionuclide releases) of waste disposal facilities and decommissioning sites.

  2. Pinellas Plant: Child Care/Partnership School safety assessment

    SciTech Connect (OSTI)

    NONE

    1989-11-01

    The Albuquerque Operations Office through the Pinellas Plant Area Office is involved in a joint venture to establish a Partnership School and a Day Care Facility at the Plant. The venture is unique in that it is based on a partnership with the local county school system. The county school system will provide the teachers, supplies and classroom furnishings for the operation of the school for pre-kindergarten, kindergarten, first and second grade during regular school hours. The Government will provide the facility and its normal operating and maintenance costs. A Day Care Facility will also be available for children from infancy through the second grade for outside school hours. The day care will be operated as a non-profit corporation. Fees paid by parents with children in the day care center will cove the cost of staff, food, supplies and liability insurance. Again, the government will provide the facility and its normal operating and maintenance costs. Between 75 and 90 children are expected in the first year of operation. The Partnership School will consist of one class each for pre-kindergarten, kindergarten and first grade. Second grade will be added in 1990. The total estimated number of children for both the Child Care and Partnership School should not exceed 200 children. Expected benefits include reduced absenteeism, tardiness and turnover and thus increased productivity. The program will be an asset in recruiting and retaining the best workforce. Other benefits include improved education for the children.

  3. Information Uncertainty to Compare Qualitative Reasoning Security Risk Assessment Results

    SciTech Connect (OSTI)

    Chavez, Gregory M [Los Alamos National Laboratory; Key, Brian P [Los Alamos National Laboratory; Zerkle, David K [Los Alamos National Laboratory; Shevitz, Daniel W [Los Alamos National Laboratory

    2009-01-01

    The security risk associated with malevolent acts such as those of terrorism are often void of the historical data required for a traditional PRA. Most information available to conduct security risk assessments for these malevolent acts is obtained from subject matter experts as subjective judgements. Qualitative reasoning approaches such as approximate reasoning and evidential reasoning are useful for modeling the predicted risk from information provided by subject matter experts. Absent from these approaches is a consistent means to compare the security risk assessment results. Associated with each predicted risk reasoning result is a quantifiable amount of information uncertainty which can be measured and used to compare the results. This paper explores using entropy measures to quantify the information uncertainty associated with conflict and non-specificity in the predicted reasoning results. The measured quantities of conflict and non-specificity can ultimately be used to compare qualitative reasoning results which are important in triage studies and ultimately resource allocation. Straight forward extensions of previous entropy measures are presented here to quantify the non-specificity and conflict associated with security risk assessment results obtained from qualitative reasoning models.

  4. OSIRIS and SOMBRERO Inertial Fusion Power Plant Designs, Volume 2: Designs, Assessments, and Comparisons

    SciTech Connect (OSTI)

    Meier, W. R.; Bieri, R. L.; Monsler, M. J.; Hendricks, C. D.; Laybourne, P.; Shillito, K. R.

    1992-03-01

    This is a comprehensive design study of two Inertial Fusion Energy (IFE) electric power plants. Conceptual designs are presented for a fusion reactor (called Osiris) using an induction-linac heavy-ion beam driver, and another (called SOMBRERO) using a KrF laser driver. The designs covered all aspects of IFE power plants, including the chambers, heat transport and power conversion systems, balance-of-plant facilities, target fabrication, target injection and tracking, as well as the heavy-ion and KrF drivers. The point designs were assessed and compared in terms of their environmental & safety aspects, reliability and availability, economics, and technology development needs.

  5. Guidebook for performance assessment parameters used in the Waste Isolation Pilot Plant compliance certification application. Volume 2: Appendices

    SciTech Connect (OSTI)

    Howarth, S.M.; Martell, M.A.; Weiner, R.; Lattier, C.

    1998-06-01

    The Waste Isolation Pilot Plant (WIPP) Compliance Certification Application (CCA) Performance Assessment (PA) Parameter Database and its ties to supporting information evolved over the course of two years. When the CCA was submitted to the Environmental Protection Agency (EPA) in October 1996, information such as identification of parameter value or distribution source was documented using processes established by Sandia National Laboratories WIPP Quality Assurance Procedures. Reviewers later requested additional supporting documentation, links to supporting information, and/or clarification for many parameters. This guidebook is designed to document a pathway through the complex parameter process and help delineate flow paths to supporting information for all WIPP CCA parameters. In addition, this report is an aid for understanding how model parameters used in the WIPP CCA were developed and qualified. To trace the source information for a particular parameter, a dual-route system was established. The first route uses information from the Parameter Records package as it existed when the CCA calculations were run. The second route leads from the EPA Parameter Database to additional supporting information.

  6. Data used in preliminary performance assessment of the Waste Isolation Pilot Plant (1990)

    SciTech Connect (OSTI)

    Rechard, R.P (Sandia National Labs., Albuquerque, NM (USA)); Luzzolino, H. (Geo-Centers, Inc., Albuquerque, NM (USA)); Sandha, J.S. (Science Applications International Corp., Albuquerque, NM (USA))

    1990-12-01

    This report documents the data available as of August 1990 and used by the Performance Assessment Division of Sandia National Laboratories in its December 1990 preliminary performance assessment of the Waste Isolation Pilot Plant (WIPP). Parameter values are presented in table form for the geologic subsystem, engineered barriers, borehole flow properties, climate variability, and intrusion characteristics. Sources for the data and a brief discussion of each parameter are provided. 101 refs., 72 figs., 21 tabs.

  7. Preliminary performance assessment for the Waste Isolation Pilot Plant, December 1992. Volume 2, Technical basis

    SciTech Connect (OSTI)

    Not Available

    1992-12-01

    Before disposing of transuranic radioactive waste in the Waste Isolation Pilot Plant (WIPP), the United States Department of Energy (DOE) must evaluate compliance with applicable long-term regulations of the United States Environmental Protection Agency (EPA). Sandia National Laboratories is conducting iterative performance assessments (PAs) of the WIPP for the DOE to provide interim guidance while preparing for a final compliance evaluation. This volume, Volume 2, contains the technical basis for the 1992 PA. Specifically, it describes the conceptual basis for consequence modeling and the PA methodology, including the selection of scenarios for analysis, the determination of scenario probabilities, and the estimation of scenario consequences using a Monte Carlo technique and a linked system of computational models. Additional information about the 1992 PA is provided in other volumes. Volume I contains an overview of WIPP PA and results of a preliminary comparison with the long-term requirements of the EPA`s Environmental Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes (40 CFR 191, Subpart B). Volume 3 contains the reference data base and values for input parameters used in consequence and probability modeling. Volume 4 contains uncertainty and sensitivity analyses related to the preliminary comparison with 40 CFR 191B. Volume 5 contains uncertainty and sensitivity analyses of gas and brine migration for undisturbed performance. Finally, guidance derived from the entire 1992 PA is presented in Volume 6.

  8. Performance Assessment Updates for Waste Isolation Pilot Plant

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (BillionProvedTravelInformationCollection RequestDemolition DebrisPatricia

  9. Steam plant ash disposal facility and industrial landfill at the Y-12 Plant, Anderson County, Tennessee. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    The US Department of Energy (DOE) is proposing to install a wet ash handling system to dewater bottom ash from the coal-fired steam plant at its Y-12 Plant and to construct a new landfill for disposal of industrial wastes, including the dewatered bottom ash. The DOE operates three major facilities on its Oak Ridge Reservation (ORR). Operation of these facilities results in the production of a variety of nonhazardous, nonradioactive solid wastes (approximately 300 m{sup 3} per day, compacted) including sanitary wastes, common industrial wastes and construction debris. At the current rate of use, this existing landfill will be filled within approximately 18 months, and more space is urgently needed. In an effort to alleviate this problem, DOE and WMD management propose to create additional landfill facilities at a nearby site. The potential environmental impacts associated with this proposed action are the subject of this environmental assessment (EA).

  10. THE IPM APP FOR PLANT PESTS UConn Extension The IPM app will provide direct access in the field to a database of information on plant pests, help the user identify the plant pest by

    E-Print Network [OSTI]

    Demurjian, Steven A.

    THE IPM APP FOR PLANT PESTS ­ UConn Extension The IPM app will provide direct access in the field to a database of information on plant pests, help the user identify the plant pest by comparing photos plants (herbs, vegetables, greens) Nursery and garden center plants: trees, shrubs, and perennials

  11. Web-based Tool for Preliminary Assessment of Wind Power Plant Design

    E-Print Network [OSTI]

    Mustakerov, Ivan

    of type, number and layout of wind turbines for given site area. Preliminary assessment of de- sign by real data for wind turbines and pa- rameters of the wind site. Keywords: wind power plant, design) is a complex and iterative process. It includes choice of turbines and definition of proper layout conforming

  12. Life Cycle Assessment of the MBT plant in Ano Liossia, Athens, Greece

    SciTech Connect (OSTI)

    Abeliotis, Konstadinos; Kalogeropoulos, Alexandros; Lasaridi, Katia

    2012-01-15

    Highlights: Black-Right-Pointing-Pointer We model the operation of an MBT plant in Greece based on LCA. Black-Right-Pointing-Pointer We compare four different MBT operating scenarios (among them and with landfilling). Black-Right-Pointing-Pointer Even the current operation of the MBT plant is preferable to landfilling. Black-Right-Pointing-Pointer Utilization of the MBT compost and metals generates the most environmental gains. Black-Right-Pointing-Pointer Thermal exploitation of RDF improves further the environmental performance of the plant. - Abstract: The aim of this paper is the application of Life Cycle Assessment to the operation of the MBT facility of Ano Liossia in the region of Attica in Greece. The region of Attica is home to almost half the population of Greece and the management of its waste is a major issue. In order to explicitly analyze the operation of the MBT plant, five scenarios were generated. Actual operation data of the MBT plant for the year 2008 were provided by the region of Attica and the LCA modeling was performed via the SimaPro 5.1 software while impact assessment was performed utilizing the Eco-indicator'99 method. The results of our analysis indicate that even the current operation of the MBT plant is preferable to landfilling. Among the scenarios of MBT operation, the one with complete utilization of the MBT outputs, i.e. compost, RDF, ferrous and non-ferrous metals, is the one that generates the most environmental gains. Our analysis indicates that the exploitation of RDF via incineration is the key factor towards improving the environmental performance of the MBT plant. Our findings provide a quantitative understanding of the MBT plant. Interpretation of results showed that proper operation of the modern waste management systems can lead to substantial reduction of environmental impacts and savings of resources.

  13. Use of probabilistic risk assessment in expert system usage for nuclear power plant safety

    SciTech Connect (OSTI)

    Uhrig, R.E.

    1987-01-01

    The introduction of probability risk assessments (PRA's) to nuclear power plants in the Rasmussen Report (WASH-1400) gave us a means of evaluating the risk to the public associated with the operation of nuclear power plants, at least on a relative basis. While the choice of the ''source term'' and methodology in a PRA significantly influence the absolute probability and the consequences of core melt, comparison of two PRA calculations for two configurations of the same plant, carried out on a consistent basis, can be readily identify the increase in risk associated with going from one configuration of a plant to another by removing components or systems from service. This ratio of core melt probabilities (assuming no recovery of failed systems) obtained from two PRA calculations for different configurations was the criterion (called ''risk factor'') chosen as a basis for making a decision in an expert system as to what mitigating action, if any, would be taken to avoid a trip situation from developing. PRISIM was developed by JBF Associates of Knoxville under the sponsorship of the NRC as a system for Resident Inspectors at nuclear power plants to provide them with a relative safety status of the plant under all configurations. PRISIM calculated the risk factor---the ration of core melt probabilities of the plant under the current configuration relative to the normal configuration with all systems functioning---using an algorithm that emulates the results of the original PRA. It also presents time and core melt (assuming no recovery of systems or components).

  14. A Higher Education TechQual+ Study 2011 Texas A&M Information Technology Staff Assessment

    E-Print Network [OSTI]

    A Higher Education TechQual+ Study 2011 Texas A&M Information Technology Staff Assessment for Texas Texas A&M Information Technology Staff Assessment Generated on Wednesday, March 09, 2011 Page 2 #12;2011 Texas A&M Information Technology Staff Assessment Generated on Wednesday, March 09, 2011 Page 3 From

  15. A Higher Education TechQual+ Study 2011 Texas A&M Information Technology Faculty Assessment

    E-Print Network [OSTI]

    A Higher Education TechQual+ Study 2011 Texas A&M Information Technology Faculty Assessment Texas A&M Information Technology Faculty Assessment Generated on Wednesday, March 09, 2011 Page 2 #12;2011 Texas A&M Information Technology Faculty Assessment Generated on Wednesday, March 09, 2011 Page 3 From

  16. Impact of structural aging on seismic risk assessment of reinforced concrete structures in nuclear power plants

    SciTech Connect (OSTI)

    Ellingwood, B.; Song, J. [Johns Hopkins Univ., Baltimore, MD (United States). Dept. of Civil Engineering

    1996-03-01

    The Structural Aging Program is addressing the potential for degradation of concrete structural components and systems in nuclear power plants over time due to aging and aggressive environmental stressors. Structures are passive under normal operating conditions but play a key role in mitigating design-basis events, particularly those arising from external challenges such as earthquakes, extreme winds, fires and floods. Structures are plant-specific and unique, often are difficult to inspect, and are virtually impossible to replace. The importance of structural failures in accident mitigation is amplified because such failures may lead to common-cause failures of other components. Structural condition assessment and service life prediction must focus on a few critical components and systems within the plant. Components and systems that are dominant contributors to risk and that require particular attention can be identified through the mathematical formalism of a probabilistic risk assessment, or PRA. To illustrate, the role of structural degradation due to aging on plant risk is examined through the framework of a Level 1 seismic PRA of a nuclear power plant. Plausible mechanisms of structural degradation are found to increase the core damage probability by approximately a factor of two.

  17. Assessment of enriched uranium storage safety issues at the Oak Ridge Y-12 Plant

    SciTech Connect (OSTI)

    NONE

    1996-08-01

    This document is an assessment of the technical safety issues pertaining to the storage of EU at the Oak Ridge Y-12 Plant. The purpose of the assessment is to serve as the basis for defining the technical standards for storage of EU at Y-12. A formal assessment of the Y-12 materials acceptance criteria for EU is currently being conducted by a task force cochaired by B. G. Eddy of DOE Oak Ridge Operations and S. 0. Cox of Y-12 Defense Programs. The mission of this technical assessment for storage is obviously dependent on results of the acceptance assessment. Clearly, the two efforts require coordination to avoid inconsistencies. In addition, both these Assessments must be consistent with the Environmental Assessment for EU storage at Y-12.1 Both the Storage Assessment and the Criteria for Acceptance must take cognizance of the fact that a portion of the EU to be submitted for storage in the future is expected to be derived from foreign sources and to include previously irradiated uranium containing significant levels of transuranics, radioactive daughter products, and unstable uranium isotopes that do not occur in the EU stream of the DOE weapons complex. National security considerations may dictate that these materials be accepted despite the fact that they fail to conform to the Acceptance Criteria. This document will attempt to address the complexities inherent in this situation.

  18. Environmental management assessment of the Waste Isolation Pilot Plant (WIPP), Carlsbad, New Mexico

    SciTech Connect (OSTI)

    Not Available

    1993-07-01

    This document contains the results of the Environmental Management Assessment of the Waste Isolation Pilot Plant (WIPP). This Assessment was conducted by EH-24 from July 19 through July 30, 1993 to advise the Secretary of Energy of the adequacy of management systems established at WIPP to ensure the protection of the environment and compliance with Federal, state, and DOE environmental requirements. The mission of WIPP is to demonstrate the safe disposal of transuranic (TRU) waste. During this assessment, activities and records were reviewed and interviews were conducted with personnel from the management and operating contractors. This assessment revealed that WIPP`s environmental safety and health programs are satisfactory, and that all levels of the Waste Isolation Division (WID) management and staff consistently exhibit a high level of commitment to achieve environmental excellence.

  19. Life Cycle Assessment of a Parabolic Trough Concentrating Solar Power Plant and Impacts of Key Design Alternatives: Preprint

    SciTech Connect (OSTI)

    Heath, G. A.; Burkhardt, J. J.; Turchi, C. S.

    2011-09-01

    Climate change and water scarcity are important issues for today's power sector. To inform capacity expansion decisions, hybrid life cycle assessment is used to evaluate a reference design of a parabolic trough concentrating solar power (CSP) facility located in Daggett, California, along four sustainability metrics: life cycle greenhouse gas (GHG) emissions, water consumption, cumulative energy demand (CED), and energy payback time (EPBT). This wet-cooled, 103 MW plant utilizes mined nitrate salts in its two-tank, thermal energy storage (TES) system. Design alternatives of dry-cooling, a thermocline TES, and synthetically-derived nitrate salt are evaluated. During its life cycle, the reference CSP plant is estimated to emit 26 g CO2eq per kWh, consume 4.7 L/kWh of water, and demand 0.40 MJeq/kWh of energy, resulting in an EPBT of approximately 1 year. The dry-cooled alternative is estimated to reduce life cycle water consumption by 77% but increase life cycle GHG emissions and CED by 8%. Synthetic nitrate salts may increase life cycle GHG emissions by 52% compared to mined. Switching from two-tank to thermocline TES configuration reduces life cycle GHG emissions, most significantly for plants using synthetically-derived nitrate salts. CSP can significantly reduce GHG emissions compared to fossil-fueled generation; however, dry-cooling may be required in many locations to minimize water consumption.

  20. Energy and Technolgy Assessment of Zinc and Magnesium Casting Plants, Technical Report Close-out, August 25,2006

    SciTech Connect (OSTI)

    Twin City Die Castings Company; Tom Heider; North American Die Castings Association

    2006-08-25

    Twin City Die Castings Company of Minneapolis, Minnesota, Twin City Die Castings Company was awarded project No. DE-FG36-05GO15097 to perform plant wide assessments of ten (10) die casting facilities that produce zinc and magnesium alloy castings in order to determine improvements and potential cost savings in energy use. Mr. Heider filled the role of team leader for the project and utilized the North American Die Casting Association (NADCA) to conduct audits at team participant plants so as to hold findings specific to each plant proprietary. The intended benefits of the project were to improve energy use through higher operational and process efficiency for the plants assessed. An improvement in energy efficiency of 5 – 15% was targeted. The primary objectives of the project was to: 1) Expand an energy and technology tool developed by the NADCA under a previous DOE project titled, “Energy and Technology Assessment for Die Casting Plants” for assessing aluminum die casting plants to be more specifically applicable to zinc and magnesium die casting facilities. 2) Conduct ten (10) assessments of zinc and magnesium die casting plants, within eight (8) companies, utilizing the assessment tool to identify, evaluate and recommend opportunities to enhance energy efficiency, minimize waste, and improve productivity. 3) Transfer the assessment tool to the die casting industry at large.

  1. Assessment of the radiological impact of a decommissioning nuclear power plant in Italy

    E-Print Network [OSTI]

    A. Petraglia; C. Sabbarese; M. De Cesare; N. De Cesare; F. Quinto; F. Terrasi; A. D'Onofrio; P. Steier; L. K. Fifield; A. M. Esposito

    2012-07-17

    The assessment of the radiological impact of a decommissioning Nuclear Power Plant is presented here through the results of an environmental monitoring survey carried out in the area surrounding the Garigliano Power Plant. The levels of radioactivity in soil, water, air and other environmental matrices are shown, in which {\\alpha}, {\\beta} and {\\gamma} activity and {\\gamma} equivalent dose rate are measured. Radioactivity levels of the samples from the Garigliano area are analyzed and then compared to those from a control zone situated more than 100 km away. Moreover, a comparison is made with a previous survey held in 2001. The analyses and comparisons show no significant alteration in the radiological characteristics of the area surroundings the plant, with an overall radioactivity depending mainly from the global fallout and natural sources.

  2. Economic Assessment of a Conceptual Biomass to Liquids Bio-Syntrolysis Plant

    SciTech Connect (OSTI)

    M. M. Plum; G. L. Hawkes

    2010-06-01

    A series of assessments evaluated the economic efficiency of integrating a nuclear electric power plant with a biomass to SynFuel plant under three market scenarios. Results strongly suggest that a nuclear assisted-BioSyntrolysis Process would be as cost competitive as other carbon feedstock to liquid fuels concepts while having significant advantages regarding CO2 greenhouse gas production. This concept may also be competitive for those energy markets where energy dense, fossil fuels are scarce while wind, hydroelectric, or other renewable energy sources can be produced at a relatively low cost. At this time, a realistic vision of this technology’s deployment of a biomass to synfuel plants powered by a nuclear 1100 MWe reactor. Accompanying an area of 25 miles by 25 miles, this integrated Enterprise could produce 24,000 BBLs of SynFuel daily; or 0.2% of the U.S.’s imported oil.

  3. Assessment of the radiological impact of a decommissioning nuclear power plant in Italy

    E-Print Network [OSTI]

    Petraglia, A; De Cesare, M; De Cesare, N; Quinto, F; Terrasi, F; D'Onofrio, A; Steier, P; Fifield, L K; Esposito, A M; 10.1051/radiopro/2012010

    2012-01-01

    The assessment of the radiological impact of a decommissioning Nuclear Power Plant is presented here through the results of an environmental monitoring survey carried out in the area surrounding the Garigliano Power Plant. The levels of radioactivity in soil, water, air and other environmental matrices are shown, in which {\\alpha}, {\\beta} and {\\gamma} activity and {\\gamma} equivalent dose rate are measured. Radioactivity levels of the samples from the Garigliano area are analyzed and then compared to those from a control zone situated more than 100 km away. Moreover, a comparison is made with a previous survey held in 2001. The analyses and comparisons show no significant alteration in the radiological characteristics of the area surroundings the plant, with an overall radioactivity depending mainly from the global fallout and natural sources.

  4. Improved assessment of population doses and risk factors for a nuclear power plant under accident conditions 

    E-Print Network [OSTI]

    Meyer, Christopher Martin

    1985-01-01

    result of an accident with the severity of those postulated in WASH-1400. These changes are nearly impossible to predict and even more difficult to quantify. For the purposes of this study, calculations will primarily be restricted to individual...IMPROVED ASSESSMENT OF POPULATION DOSES AND RISK FACTORS FOR A NUCLEAR PONER PLANT UNDER ACCIDENT CONDITIONS A Thesis by CHRISTOPHER MARTIN NEVER Submitted to the Graduate College of Texas A&M University in partial fulfillment...

  5. A Web-based Plant Tissue Culture Information System 

    E-Print Network [OSTI]

    Herring, April Sky

    2001-01-01

    The World Wide Web recently emerged as a method for scientists to communicate with each other in a more rapid and in a less costly manner. The University of Minnesota hosts the PLANT-TC listserv as a service to the international tissue culture...

  6. An assessment of mercury emissions and health risks from a coal-fired power plant

    SciTech Connect (OSTI)

    Fthenakis, V.M.; Lipfert, F.; Moskowitz, P.

    1994-12-01

    Title 3 of the 1990 Clean Air Act Amendments (CAAA) mandated that the US Environmental Protection Agency (EPA) evaluate the need to regulate mercury emissions from electric utilities. In support of this forthcoming regulatory analysis the U.S. DOE, sponsored a risk assessment project at Brookhaven (BNL) to evaluate methylmercury (MeHg) hazards independently. In the US MeHg is the predominant way of exposure to mercury originated in the atmosphere. In the BNL study, health risks to adults resulting from Hg emissions from a hypothetical 1,000 MW coal-fired power plant were estimated using probabilistic risk assessment techniques. This study showed that the effects of emissions of a single power plant may double the background exposures to MeHg resulting from consuming fish obtained from a localized area near the power plant. Even at these more elevated exposure levels, the attributable incidence in mild neurological symptoms was estimated to be quite small, especially when compared with the estimated background incidence in the population. The current paper summarizes the basic conclusions of this assessment and highlights issues dealing with emissions control and environmental transport.

  7. 3M: Hutchinson Plant Focuses on Heat Recovery and Cogeneration during Plan-Wide Energy-Efficiency Assessment

    SciTech Connect (OSTI)

    2003-06-01

    3M performed a plant-wide energy efficiency assessment at its Hutchinson, Minnesota, plant to identify energy- and cost-saving opportunities. Assessment staff developed four separate implementation packages that represented various combinations of energy-efficiency projects involving chiller consolidation, air compressor cooling improvements, a steam turbine used for cogeneration, and a heat recovery boiler for two of the plant's thermal oxidizers. Staff estimated that the plant could save 6 million kWh/yr in electricity and more than 200,000 MMBtu/yr in natural gas and fuel oil, and avoid energy costs of more than $1 million during the first year.

  8. McHuchuma/Katewaka coal fired power plant feasibility study. Final report. Export trade information

    SciTech Connect (OSTI)

    1996-11-22

    This study, conducted by Black and Veatch International, was funded by the U.S. Trade and Development Agency. The report assesses the feasibility for the development of a new coal fueled power plant in Tanzania at the Mchuchuma/Katewaka coal concession area. Volume 3, the Main Report, is divided into the following sections: (1.0) Introduction; (2.0) Power System Development Studies; (3.0) Conceptual Design Summary of the Mchuchuma Coal Fired Power Plant; (4.0) Fuel Supply Evaluation; (5.0) Transmission System Evaluation; (6.0) Power Plant Site and Infrastructure Evaluation; (7.0) Environmental Impact Assessment; (8.0) Institutional Aspects; (9.0) Financial Evaluation and Benefit Analysis; (10.0) Sources of Finance; Appendix (A) Preliminary Design of Mchuchuma Coal Plant.

  9. Assessment Plan for the Field of Plant Pathology and Plant-Microbe Biology All graduate students in PPPMB MS and PhD programs are required to write a thesis research proposal that

    E-Print Network [OSTI]

    Walter, M.Todd

    Assessment Plan for the Field of Plant Pathology and Plant-Microbe Biology All graduate students and graphics. 2. Demonstrate a broad knowledge of core concepts in Plant Pathology and Plant-Microbe Biology Pathology and Plant-Microbe Biology taught in required courses and knowledge of their specialized area

  10. SLUDGE TREATMENT PROJECT PHASE 1 SLUDGE STORAGE OPTIONS ASSESSMENT OF T PLANT VERSUS ALTERNATE STORAGE FACILITY

    SciTech Connect (OSTI)

    RUTHERFORD WW; GEUTHER WJ; STRANKMAN MR; CONRAD EA; RHOADARMER DD; BLACK DM; POTTMEYER JA

    2009-04-29

    The CH2M HILL Plateau Remediation Company (CHPRC) has recommended to the U.S. Department of Energy (DOE) a two phase approach for removal and storage (Phase 1) and treatment and packaging for offsite shipment (Phase 2) of the sludge currently stored within the 105-K West Basin. This two phased strategy enables early removal of sludge from the 105-K West Basin by 2015, allowing remediation of historical unplanned releases of waste and closure of the 100-K Area. In Phase 1, the sludge currently stored in the Engineered Containers and Settler Tanks within the 105-K West Basin will be transferred into sludge transport and storage containers (STSCs). The STSCs will be transported to an interim storage facility. In Phase 2, sludge will be processed (treated) to meet shipping and disposal requirements and the sludge will be packaged for final disposal at a geologic repository. The purpose of this study is to evaluate two alternatives for interim Phase 1 storage of K Basin sludge. The cost, schedule, and risks for sludge storage at a newly-constructed Alternate Storage Facility (ASF) are compared to those at T Plant, which has been used previously for sludge storage. Based on the results of the assessment, T Plant is recommended for Phase 1 interim storage of sludge. Key elements that support this recommendation are the following: (1) T Plant has a proven process for storing sludge; (2) T Plant storage can be implemented at a lower incremental cost than the ASF; and (3) T Plant storage has a more favorable schedule profile, which provides more float, than the ASF. Underpinning the recommendation of T Plant for sludge storage is the assumption that T Plant has a durable, extended mission independent of the K Basin sludge interim storage mission. If this assumption cannot be validated and the operating costs of T Plant are borne by the Sludge Treatment Project, the conclusions and recommendations of this study would change. The following decision-making strategy, which is dependent on the confidence that DOE has in the long term mission for T Plant, is proposed: (1) If the confidence level in a durable, extended T Plant mission independent of sludge storage is high, then the Sludge Treatment Project (STP) would continue to implement the path forward previously described in the Alternatives Report (HNF-39744). Risks to the sludge project can be minimized through the establishment of an Interface Control Document (ICD) defining agreed upon responsibilities for both the STP and T Plant Operations regarding the transfer and storage of sludge and ensuring that the T Plant upgrade and operational schedule is well integrated with the sludge storage activities. (2) If the confidence level in a durable, extended T Plant mission independent of sludge storage is uncertain, then the ASF conceptual design should be pursued on a parallel path with preparation of T Plant for sludge storage until those uncertainties are resolved. (3) Finally, if the confidence level in a durable, extended T Plant mission independent of sludge storage is low, then the ASF design should be selected to provide independence from the T Plant mission risk.

  11. Sustainability Assessment of Coal-Fired Power Plants with Carbon Capture and Storage

    SciTech Connect (OSTI)

    Widder, Sarah H.; Butner, R. Scott; Elliott, Michael L.; Freeman, Charles J.

    2011-11-30

    Carbon capture and sequestration (CCS) has the ability to dramatically reduce carbon dioxide (CO2) emissions from power production. Most studies find the potential for 70 to 80 percent reductions in CO2 emissions on a life-cycle basis, depending on the technology. Because of this potential, utilities and policymakers are considering the wide-spread implementation of CCS technology on new and existing coal plants to dramatically curb greenhouse gas (GHG) emissions from the power generation sector. However, the implementation of CCS systems will have many other social, economic, and environmental impacts beyond curbing GHG emissions that must be considered to achieve sustainable energy generation. For example, emissions of nitrogen oxides (NOx), sulfur oxides (SOx), and particulate matter (PM) are also important environmental concerns for coal-fired power plants. For example, several studies have shown that eutrophication is expected to double and acidification would increase due to increases in NOx emissions for a coal plant with CCS provided by monoethanolamine (MEA) scrubbing. Potential for human health risks is also expected to increase due to increased heavy metals in water from increased coal mining and MEA hazardous waste, although there is currently not enough information to relate this potential to actual realized health impacts. In addition to environmental and human health impacts, supply chain impacts and other social, economic, or strategic impacts will be important to consider. A thorough review of the literature for life-cycle analyses of power generation processes using CCS technology via the MEA absorption process, and other energy generation technologies as applicable, yielded large variability in methods and core metrics. Nonetheless, a few key areas of impact for CCS were developed from the studies that we reviewed. These are: the impact of MEA generation on increased eutrophication and acidification from ammonia emissions and increased toxicity from MEA production and the impact of increased coal use including the increased generation of NOx from combustion and transportation, impacts of increased mining of coal and limestone, and the disposal of toxic fly ash and boiler ash waste streams. Overall, the implementing CCS technology could contribute to a dramatic decrease in global GHG emissions, while most other environmental and human health impact categories increase only slightly on a global scale. However, the impacts on human toxicity and ecotoxicity have not been studied as extensively and could have more severe impacts on a regional or local scale. More research is needed to draw strong conclusions with respect to the specific relative impact of different CCS technologies. Specifically, a more robust data set that disaggregates data in terms of component processes and treats a more comprehensive set of environmental impacts categories from a life-cycle perspective is needed. In addition, the current LCA framework lacks the required temporal and spatial scales to determine the risk of environmental impact from carbon sequestration. Appropriate factors to use when assessing the risk of water acidification (groundwater/oceans/aquifers depending on sequestration site), risk of increased human toxicity impact from large accidental releases from pipeline or wells, and the legal and public policy risk associated with licensing CO2 sequestration sites are also not currently addressed. In addition to identifying potential environmental, social, or risk-related issues that could impede the large-scale deployment of CCS, performing LCA-based studies on energy generation technologies can suggest places to focus our efforts to achieve technically feasible, economically viable, and environmentally conscious energy generation technologies for maximum impact.

  12. Poly Plant Project Inc PPP | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio1975) |Texas: Energy ResourcesArkansas:Wisconsin: EnergydePlant

  13. AN ASSESSMENT OF THE BRAYTON CYCLE FOR HIGH PERFORMANCE POWER PLANTS R. Schleicher A. R. Raffray C. P. Wong

    E-Print Network [OSTI]

    AN ASSESSMENT OF THE BRAYTON CYCLE FOR HIGH PERFORMANCE POWER PLANTS R. Schleicher A. R. Raffray C and the risk associated with oil lubricated bearings. 2 Interest in nuclear CCGTs was revived in the 1990s

  14. Defining resilience within a risk-informed assessment framework

    SciTech Connect (OSTI)

    Coles, Garill A.; Unwin, Stephen D.; Holter, Gregory M.; Bass, Robert B.; Dagle, Jeffery E.

    2011-08-01

    The concept of resilience is the subject of considerable discussion in academic, business, and governmental circles. The United States Department of Homeland Security for one has emphasised the need to consider resilience in safeguarding critical infrastructure and key resources. The concept of resilience is complex, multidimensional, and defined differently by different stakeholders. The authors contend that there is a benefit in moving from discussing resilience as an abstraction to defining resilience as a measurable characteristic of a system. This paper proposes defining resilience measures using elements of a traditional risk assessment framework to help clarify the concept of resilience and as a way to provide non-traditional risk information. The authors show various, diverse dimensions of resilience can be quantitatively defined in a common risk assessment framework based on the concept of loss of service. This allows the comparison of options for improving the resilience of infrastructure and presents a means to perform cost-benefit analysis. This paper discusses definitions and key aspects of resilience, presents equations for the risk of loss of infrastructure function that incorporate four key aspects of resilience that could prevent or mitigate that loss, describes proposed resilience factor definitions based on those risk impacts, and provides an example that illustrates how resilience factors would be calculated using a hypothetical scenario.

  15. Miravalles II Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland: Energy ResourcesDec 2005Minnehaha County,EnergyII Geothermal Power Plant Jump

  16. Miravalles III Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland: Energy ResourcesDec 2005Minnehaha County,EnergyII Geothermal Power Plant

  17. Miravalles V Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland: Energy ResourcesDec 2005Minnehaha County,EnergyII Geothermal Power PlantIV

  18. Plant City, Florida: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio1975) | OpenBethlehemPlainsboro Center,Planned GeothermalPlant City,

  19. Plant No 2 Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio1975) | OpenBethlehemPlainsboro Center,Planned GeothermalPlant

  20. Property:Plants with Unknown Planned Capacity | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo,AltFuelVehicle2FlatDemandMonth3 Jump to: navigation, searchPhone Jump to:Plants with

  1. Niland Solar Farm LLC Solar Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPI VenturesNew Hampshire: Energy ResourcesNiigata Geothermal Power PlantNiland

  2. MHK Projects/Pennamaquan Tidal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIXsource HistoryScenarios Towards 2050 JumpCoos BayOyster 800 Project < MHKPenichePlant

  3. Blue Lake Plant Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoop IncIowaWisconsin:Pontiac Biomass Facility JumpIICalifornia: EnergyCHillPlant

  4. Zhangjiajie Tumuxi Hydropower Plant Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoop IncIowa (UtilityMichigan) JumpZhuyuan ElectricTumuxi Hydropower Plant Co Ltd Jump

  5. Solar Millenium Palen Solar Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-Enhancing Capacity forSilicium deEnergy InformationDepotGreenPalen Solar Power

  6. MHK Projects/OWC Pico Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas:Montezuma,Information MHKMHK5 < MHK ProjectsHawaii <|Information OSUOWC

  7. The Ohio River Valley CO2 Storage Project AEP Mountaineer Plant, West Virginia Numerical Simulation and Risk Assessment Report

    SciTech Connect (OSTI)

    Neeraj Gupta

    2008-03-31

    A series of numerical simulations of carbon dioxide (CO{sub 2}) injection were conducted as part of a program to assess the potential for geologic sequestration in deep geologic reservoirs (the Rose Run and Copper Ridge formations), at the American Electric Power (AEP) Mountaineer Power Plant outside of New Haven, West Virginia. The simulations were executed using the H{sub 2}O-CO{sub 2}-NaCl operational mode of the Subsurface Transport Over Multiple Phases (STOMP) simulator (White and Oostrom, 2006). The objective of the Rose Run formation modeling was to predict CO{sub 2} injection rates using data from the core analysis conducted on the samples. A systematic screening procedure was applied to the Ohio River Valley CO{sub 2} storage site utilizing the Features, Elements, and Processes (FEP) database for geological storage of CO{sub 2} (Savage et al., 2004). The objective of the screening was to identify potential risk categories for the long-term geological storage of CO{sub 2} at the Mountaineer Power Plant in New Haven, West Virginia. Over 130 FEPs in seven main classes were assessed for the project based on site characterization information gathered in a geological background study, testing in a deep well drilled on the site, and general site conditions. In evaluating the database, it was apparent that many of the items were not applicable to the Mountaineer site based its geologic framework and environmental setting. Nine FEPs were identified for further consideration for the site. These FEPs generally fell into categories related to variations in subsurface geology, well completion materials, and the behavior of CO{sub 2} in the subsurface. Results from the screening were used to provide guidance on injection system design, developing a monitoring program, performing reservoir simulations, and other risk assessment efforts. Initial work indicates that the significant FEPs may be accounted for by focusing the storage program on these potential issues. The screening method was also useful in identifying unnecessary items that were not significant given the site-specific geology and proposed scale of the Ohio River Valley CO{sub 2} Storage Project. Overall, the FEP database approach provides a comprehensive methodology for assessing potential risk for a practical CO{sub 2} storage application. An integrated numerical fate and transport model was developed to enable risk and consequence assessment at field scale. Results show that such an integrated modeling effort would be helpful in meeting the project objectives (such as site characterization, engineering, permitting, monitoring and closure) during different stages. A reservoir-scale numerical model was extended further to develop an integrated assessment framework which can address the risk and consequence assessment, monitoring network design and permitting guidance needs. The method was used to simulate sequestration of CO{sub 2} in moderate quantities at the Mountaineer Power Plant. Results indicate that at the relatively low injection volumes planned for pilot scale demonstration at this site, the risks involved are minor to negligible, owing to a thick, low permeability caprock and overburden zones. Such integrated modeling approaches coupled with risk and consequence assessment modeling are valuable to project implementation, permitting, monitoring as well as site closure.

  8. Wayang Windu Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEt Al.,Turin,VillageWarrensourceCentre Jump to:

  9. Yanaizu-Nishiyama Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEtGeorgia:Illinois:Wizard PowerWyandanch,Yamhill, Oregon:

  10. Stowe Power Production Plant Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-Enhancing CapacityVectren) JumpandStereoNew York:Wisconsin: Energy Resources

  11. Suginoi Hotel Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-Enhancing CapacityVectren)Model for the Entire Country |Illinois: EnergyHill,Suginoi

  12. Mammoth Pacific II Power Plant Details | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas:Montezuma,Information MHKMHK5Transport ProjectsI Geothermal Facility Jump

  13. Marsh Road Power Plant Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas:Montezuma,InformationIllinois: EnergyWisconsin: Energy Resources Jump

  14. Coolidge Petrosun Optimum Biodiesel Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTIONRobertsdale, Alabama (Utility Company)| Open(Evans, EtInformationRoof Calculator

  15. Combined Fire Hazards Analysis/Assessment, Building 9203 & 9203A Complex- Y12 Plant, Oak Ridge, Tennessee

    Broader source: Energy.gov [DOE]

    This assessment/analysis is intended to provide a comprehensive assessment of the risks from fire and fire related perils in the Building 9203 and 9203A Complex at the Oak Ridge Y-12 Plant. The analysis has been prepared in accordance with the criteria listed in DOE Order 5480.7A.

  16. Developing and assessing accident management plans for nuclear power plants, Development process and criteria. Volume 1

    SciTech Connect (OSTI)

    Hanson, D.J.; Blackman, H.S.; Meyer, O.R.; Ward, L.W. [Idaho National Engineering Lab., Idaho Falls, ID (United States)

    1992-08-01

    This document is the first volume of a two-volume NUREG/CR. It describes a four-phase approach for developing criteria that can be used for assessing the adequacy of severe accident management plans for nuclear power plants. The general attributes of accident management plans (Phase 1) are identified, and a process for developing and implementing severe accident management plans (Phase 2) is described. This process is based on a prototype process described in NUREG/CR-5543. The prototype process was revised using results from an evaluation of this process (Phase 3), which is documented in Volume 2. General criteria for assessing the adequacy of accident management plans are also presented (Phase 4). These criteria were based on process specific criteria presented in Volume 2 and NUREG/CR-5543.

  17. Developing and assessing accident management plans for nuclear power plants, Development process and criteria

    SciTech Connect (OSTI)

    Hanson, D.J.; Blackman, H.S.; Meyer, O.R.; Ward, L.W. (Idaho National Engineering Lab., Idaho Falls, ID (United States))

    1992-08-01

    This document is the first volume of a two-volume NUREG/CR. It describes a four-phase approach for developing criteria that can be used for assessing the adequacy of severe accident management plans for nuclear power plants. The general attributes of accident management plans (Phase 1) are identified, and a process for developing and implementing severe accident management plans (Phase 2) is described. This process is based on a prototype process described in NUREG/CR-5543. The prototype process was revised using results from an evaluation of this process (Phase 3), which is documented in Volume 2. General criteria for assessing the adequacy of accident management plans are also presented (Phase 4). These criteria were based on process specific criteria presented in Volume 2 and NUREG/CR-5543.

  18. A formal expert judgment procedure for performance assessments of the Waste Isolation Pilot Plant

    SciTech Connect (OSTI)

    Trauth, K.M.; Guzowski, R.V.; Hora, S.C.

    1994-09-01

    The Waste Isolation Pilot Plant (WIPP) is an experimental facility located in southeastern New Mexico. It has been designed to determine the feasibility of the geologic disposal of defense-generated transuranic waste in a deep bedded-salt formation. The WIPP was also designed for disposal and will operate in that capacity if approved. The WIPP Performance Assessment Department at Sandia National Laboratories has been conducting analyses to assess the long-term performance of the WIPP. These analyses sometimes require the use of expert judgment. This Department has convened several expert-judgment panels and from that experience has developed an internal quality-assurance procedure to guide the formal elicitation of expert judgment. This protocol is based on the principles found in the decision-analysis literature.

  19. Verkhne-Mutnovskaya Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEt Al.,Turin, NewArkansas: EnergyVentnor City, NewVerdi

  20. Turkerler Alasehir Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEt Al.,Turin, New York: Energy Resources Jump to: navigation, searchTurkerler

  1. Guadalupe Power Plant Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainableGlynn County,Solar JumpInformationGrowind JumpIsidroNew Mexico:Power

  2. Solaren Space Solar Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-Enhancing Capacity forSilicium deEnergyCompanySolarLabSolarcomplex AG JumpSolarenSpace

  3. Starwood Solar I Solar Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-Enhancing CapacityVectren) Jump to:SpillDavid,EnergybyBiomassManufacturing IncStarwood

  4. MHK Projects/Rockaway Tidal Energy Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas:Montezuma,Information MHKMHK5 < MHKKembla < MHK Projects JumpRockaway Tidal

  5. Malavi Power Plant Ltd MPPL pltd | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas:Montezuma,Information MHKMHK5Transport Projects | OpenMak-BanManagement |Malavi

  6. Map of Solar Power Plants/Data | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas:Montezuma,Information MHKMHK5TransportManitouChange | OpenMap of BiomassMapMap of

  7. Kirishima Kokusai Hotel Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas: Energy ResourcesOrderInformation KilaueaKinnelon, NewOklahoma: EnergyKirishima

  8. Nevada Solar One Solar Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPI Ventures Ltd JumpNesjavellirInformation ProceduresCivil ProcedureSolar

  9. Olkaria III Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPI VenturesNewSt.Information Olinda Landfill GasI Geothermal Power

  10. Onikobe Onikobe Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPI VenturesNewSt.Information Olinda LandfillShakthiNevadaOnikobe Onikobe

  11. Berlín Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental JumpInformation BeaufortBent County,Benton,Berks County,Heights,Vermont:Berlín

  12. Blundell 2 Power Plant Details | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental JumpInformationBio-GasIllinois: EnergyHills,Bluefield Partners LLP

  13. Bogoroditsk Plant of Technochemical Products BTCP | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental JumpInformationBio-GasIllinois: EnergyHills,BluefieldBob

  14. Bouillante 1 Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental JumpInformationBio-GasIllinois:EnergyIdahoTechnology Venture(Redirectedmap

  15. Bouillante 2 Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental JumpInformationBio-GasIllinois:EnergyIdahoTechnology Venture(Redirectedmap2

  16. Map of Solar Power Plants | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIXsource HistoryScenarios TowardsInformation Reducing theMassachusetts:PageMap of Solar

  17. ENERGY STAR Labeled Buildings and Plants | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoopButtePower VenturesInformation9)askDoubleEERE - Energy DataEIQENEL Salt

  18. Environment, safety and Health Progress Assessment of the Rocky Flats Plant

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    This report documents the result of the US Department of Energy`s (DOE) Environment, Safety and Health (ES&H) Progress Assessment of the DOE Rocky Flats Plant (RFP) in Golden, Colorado. The assessment, which was conducted during the period of May 17 through May 28, 1993, included a selective review of the ES&H management systems and programs of the responsible DOE Headquarters Program Offices (Defense Programs (DP) and Environmental Restoration and Waste Management (EM)), the DOE Rocky Flats Office (RFO), and the site contractor, EG&G Rocky Flats, Inc. (EG&G). Despite the near constant state of flux under which RFP has been required to operate, the Progress Assessment Team has concluded that significant progress has been made in correcting the deficiencies identified in the 1989 Assessment and in responding responsibly to regulations, and DOE directives and guidance that have been issued since that time. The Team concluded that the improvements have been concentrated in the activities associated with plutonium facilities and in regulatory driven programs. Much remains to be done with respect to implementing on a sitewide basis those management systems that anchor an organization`s pursuit of continuous ES&H improvement. Furthermore the Team concluded that the pace of improvement has been constrained by a combination of factors that have limited the site`s ability to manage change in the pursuit of sitewide ES&H excellence.

  19. Assessment of instrumentation needs for advanced coal power plant applications: Final report

    SciTech Connect (OSTI)

    Nelson, E.T.; Fischer, W.H.; Lipka, J.V.; Rutkowski, M.D.; Zaharchuk, R.

    1987-10-01

    The purpose of this study was to identify contaminants, identify instrumentation needs, assess available instrumentation and identify instruments that should be developed for controlling and monitoring gas streams encountered in the following power plants: Integrated Gasification Combined Cycle, Pressurized Fluidized Bed Combustion, and Gasification Molten Carbonate Fuel Cell. Emphasis was placed on hot gas cleanup system gas stream analysis, and included process control, research and environmental monitoring needs. Commercial process analyzers, typical of those currently used for process control purposes, were reviewed for the purpose of indicating commercial status. No instrument selection guidelines were found which were capable of replacing user interaction with the process analyzer vendors. This study leads to the following conclusions: available process analyzers for coal-derived gas cleanup applications satisfy current power system process control and regulatory requirements, but they are troublesome to maintain; commercial gas conditioning systems and in situ analyzers continue to be unavailable for hot gas cleanup applications; many research-oriented gas stream characterization and toxicity assessment needs can not be met by commercially available process analyzers; and greater emphasis should be placed on instrumentation and control system planning for future power plant applications. Analyzers for specific compounds are not recommended other than those needed for current process control purposes. Instead, some generally useful on-line laser-based and inductively coupled plasma methods are recommended for further development because of their potential for use in present hot gas cleanup research and future optimization, component protection and regulation compliance activities. 48 refs., 21 figs., 26 tabs.

  20. For More Information: http://dbbs.wustl.edu/divprograms/PlantMicroBioSci

    E-Print Network [OSTI]

    Grant, Gregory

    : dbbs-info@wustl.edu what is plant & microbial biosciences? Researchers in PMB employ prokaryotes and microbial systems adds to our knowledge of basic biology, informs our understanding of the natural world and investment in biological research, and fueled by experimental resources found at WUSTL. Students primarily

  1. DAM SAFETY DECISION-MAKING: COMBINING ENGINEERING ASSESSMENTS WITH RISK INFORMATION

    E-Print Network [OSTI]

    Bowles, David S.

    DAM SAFETY DECISION-MAKING: COMBINING ENGINEERING ASSESSMENTS WITH RISK INFORMATION David S. Bowles breaching a dam; so drop the matter before a dispute breaks out. Proverbs 17:14 (NIV) ABSTRACT A decision assessments and risk assessments. The approach can be adapted to any dam owner's unique decision context

  2. Historical Background on Assessment the Performance of the Waste Isolation Pilot Plant

    SciTech Connect (OSTI)

    Rechard, R.P.

    1999-06-01

    In 1979, six years after selecting the Delaware Basin as a potential disposal area, Congress authorized the US Department of Energy to build the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico, as a research and development facility for the safe management, storage, and disposal of waste contaminated with transuranic radioisotopes. In 1998, 19 years after authorization and 25 years after site selection, the US Environmental Protection Agency (EPA) certified that the WIPP disposal system complied with its regulations. The EPA's decision was primarily based on the results from a performance assessment conducted in 1996. This performance assessment was the culmination of four preliminary performance assessments conducted between 1989 and 1992. This report provides a historical setting and context for how the performance of the deep geologic repository at the WIPP was analyzed. Also included is background on political forces acting on the project. For example, the federal requirement to provide environmental impact statements and negotiated agreements with the State of New Mexico influenced the type of scientific areas that were investigated and the engineering analysis prior to 1989 for the WIPP.

  3. Assessment of H-Coal process developments: impact on the performance and economics of a proposed commercial plant

    SciTech Connect (OSTI)

    Talib, A.; Gray, D.; Neuworth, M.

    1984-01-01

    This report assesses the performance of the H-Coal process, a catalytic direct liquefaction process, at a process development and large pilot-plant scale of operation. The assessment focused on the evaluation of operating results from selected long-term successful process development unit (PDU) and pilot plant runs made on Illinois No. 6 coal. The pilot plant has largely duplicated the product yield structure obtained during the PDU runs. Also, the quality of products, particularly liquid products, produced during the pilot plant run is quite comparable to that produced during the PDU runs. This confirms the scalability of the H-Coal ebullated-bed reactor system from a PDU-scale, 3 tons of coal per day, to a large pilot scale, 220 tons of coal per day, plant. The minor product yield differences, such as higher yields of C/sub 3/, C/sub 4/, and naphtha fractions, and lower yields of distillate oils obtained during pilot plant runs as compared to the PDU runs, will not impact the projected technical and economic performance of a first-of-a-kind commercial H-Coal plant. Thus, the process yield and operating data collected during the PDU operations provided an adequate basis for projecting the technical and economic performance of the proposed H-Coal commercial plant. 18 references, 9 figures, 56 tables.

  4. Renewable Electric Plant Information System user interface manual: Paradox 7 Runtime for Windows

    SciTech Connect (OSTI)

    1996-11-01

    The Renewable Electric Plant Information System (REPiS) is a comprehensive database with detailed information on grid-connected renewable electric plants in the US. The current version, REPiS3 beta, was developed in Paradox for Windows. The user interface (UI) was developed to facilitate easy access to information in the database, without the need to have, or know how to use, Paradox for Windows. The UI is designed to provide quick responses to commonly requested sorts of the database. A quick perusal of this manual will familiarize one with the functions of the UI and will make use of the system easier. There are six parts to this manual: (1) Quick Start: Instructions for Users Familiar with Database Applications; (2) Getting Started: The Installation Process; (3) Choosing the Appropriate Report; (4) Using the User Interface; (5) Troubleshooting; (6) Appendices A and B.

  5. Assessment of Nonnative Invasive Plants in the DOE Oak Ridge National Environmental Research Park

    SciTech Connect (OSTI)

    Drake, S.J.

    2002-11-05

    The Department of Energy (DOE) National Environmental Research Park at Oak Ridge, Tennessee, is composed of second-growth forest stands characteristic of much of the eastern deciduous forest of the Ridge and Valley Province of Tennessee. Human use of natural ecosystems in this region has facilitated the establishment of at least 167 nonnative, invasive plant species on the Research Park. Our objective was to assess the distribution, abundance, impact, and potential for control of the 18 most abundant invasive species on the Research Park. In 2000, field surveys were conducted of 16 management areas on the Research Park (14 Natural Areas, 1 Reference Area, and Walker Branch Watershed) and the Research Park as a whole to acquire qualitative and quantitative data on the distribution and abundance of these taxa. Data from the surveys were used to rank the relative importance of these species using the ''Alien Plant Ranking System, Version 5.1'' developed by the U.S. Geological Survey. Microstegium (Microstegium vimineum) was ranked highest, or most problematic, for the entire Research Park because of its potential impact on natural systems, its tendency to become a management problem, and how difficult it is to control. Microstegium was present in 12 of the 16 individual sites surveyed; when present, it consistently ranked as the most problematic invasive species, particularly in terms of its potential impact on natural systems. Japanese honeysuckle (Lonicera japonica) and Chinese privet (Ligustrum sinense) were the second- and third-most problematic plant species on the Research Park; these two species were present in 12 and 9 of the 16 sites surveyed, respectively, and often ranked second- or third-most problematic. Other nonnative, invasive species, in decreasing rank order, included kudzu (Pueraria montma), multiflora rose (Rosa multiflora), Chinese lespedeza (Lespedeza cuneara), and other species representing a variety of life forms and growth forms. Results of this research can be used to prioritize management and research activities related to these invasive taxa on the Research Park as a whole and for specific Natural or Reference Areas. Additional research on the autecology and synecology of each species surveyed is suggested. In particular, research should focus on assessing the impacts of these species on the invaded plant and animal communities and ecosystems. Finally, this ranking system could be used to similarly rank the many other nonnative, invasive species present on the Research Park not included in this study.

  6. Methodology and application of surrogate plant PRA analysis to the Rancho Seco Power Plant: Final report

    SciTech Connect (OSTI)

    Gore, B.F.; Huenefeld, J.C.

    1987-07-01

    This report presents the development and the first application of generic probabilistic risk assessment (PRA) information for identifying systems and components important to public risk at nuclear power plants lacking plant-specific PRAs. A methodology is presented for using the results of PRAs for similar (surrogate) plants, along with plant-specific information about the plant of interest and the surrogate plants, to infer important failure modes for systems of the plant of interest. This methodology, and the rationale on which it is based, is presented in the context of its application to the Rancho Seco plant. The Rancho Seco plant has been analyzed using PRA information from two surrogate plants. This analysis has been used to guide development of considerable plant-specific information about Rancho Seco systems and components important to minimizing public risk, which is also presented herein.

  7. An assessment of criticality safety at the Department of Energy Rocky Flats Plant, Golden, Colorado, July--September 1989

    SciTech Connect (OSTI)

    Mattson, Roger J.

    1989-09-01

    This is a report on the 1989 independent Criticality Safety Assessment of the Rocky Flats Plant, primarily in response to public concerns that nuclear criticality accidents involving plutonium may have occurred at this nuclear weapon component fabrication and processing plant. The report evaluates environmental issues, fissile material storage practices, ventilation system problem areas, and criticality safety practices. While no evidence of a criticality accident was found, several recommendations are made for criticality safety improvements. 9 tabs.

  8. Waste-minimization assessment for a paint-manufacturing plant. Environmental research brief

    SciTech Connect (OSTI)

    Kirsch, F.W.; Looby, G.P.

    1991-07-01

    The U.S. Environmental Protection Agency (EPA) has funded a pilot project to assist small- and medium-size manufacturers who want to minimize their generation of hazardous waste but who lack the expertise to do so. Waste Minimization Assessment Centers (WMACs) were established at selected universities and procedures were adapted from the EPA Waste Minimization Opportunity Assessment Manual (EPA/625/7-88/003, July 1988). The WMAC team at Colorado State University inspected a plant blending and mixing raw materials into paints, coatings, stains, and surface-treating products. For water-based paints, water, latex, resins, extenders, and pigments are mixed and blended. For oil-based paints, solvents replace water and latex, and plasticizers, tints, and thinners are also added. These batches are then transferred to let-down tanks where additional ingredients are incorporated. After testing, the paints meeting specifications are filtered, canned, labelled, and packaged for shipping. Hazardous wastes result when the mixing vessels, let-down tanks, and lines are cleaned. For example, cleaning a let-down tank after a water-based paint has been blended requires about 35 gal water; after a 400-gal tank for a solvent-based paint, about 5 gal mineral spirits. Because the spirits are sent off-site for recovery, most of the waste results from cleaning up after mixing water-based paint. This waste is hazardous because it contains mercury used as the bactericide. Although the plant reuses rinse water, recovers solvent, and has adopted other measures to reduce waste, the team report, detailing findings and recommendations, suggested that additional savings could result from installing a pipe cleaning system, using a solvent-recovery system based on distillation, and substituting an organic material for the mercury bactericide.

  9. Toward a risk-based approach to the assessment of the surety of information systems

    SciTech Connect (OSTI)

    Wyss, G.D.; Fletcher, S.K.; Halbgewachs, R.D.; Jansma, R.M.; Lim, J.J.; Murphy, M.; Sands, P.D.

    1995-03-01

    Traditional approaches to the assessment of information systems have treated system security, system reliability, data integrity, and application functionality as separate disciplines. However, each areas requirements and solutions have a profound impact on the successful implementation of the other areas. A better approach is to assess the ``surety`` of an information system, which is defined as ensuring the ``correct`` operation of an information system by incorporating appropriate levels of safety, functionality, confidentiality, availability, and integrity. Information surety examines the combined impact of design alternatives on all of these areas. We propose a modelling approach that combines aspects of fault trees and influence diagrams for assessing information surety requirements under a risk assessment framework. This approach allows tradeoffs to be based on quantitative importance measures such as risk reduction while maintaining the modelling flexibility of the influence diagram paradigm. This paper presents an overview of the modelling method and a sample application problem.

  10. Replacement of chlorofluorocarbons at the DOE gaseous diffusion plants: An assessment of global impacts

    SciTech Connect (OSTI)

    Socolof, M.L.; McCold, L.N.; Saylor, R.E.

    1997-01-01

    Three gaseous diffusion plants (GDPs) for enriching uranium maintain a large inventory of chlorofluorocarbon-114 (CFC-114) as a coolant. To address the continued use of CFC-114, an ozone-depleting substance, the US Department of Energy (DOE) considered introducing perfluorocarbons (PFCs) by the end of 1995. These PFCs would not contribute to stratospheric ozone depletion but would be larger contributors to global warming than would CFC-114. The paper reports the results of an assessment of the global impacts of four alternatives for modifying GDP coolant system operations over a three-year period beginning in 1996. The overall contribution of GDP coolant releases to impacts on ozone depletion and global warming were quantified by parameters referred to as ozone-depletion impact and global-warming impact. The analysis showed that these parameters could be used as surrogates for predicting global impacts to all resources and could provide a framework for assessing environmental impacts of a permanent coolant replacement, eliminating the need for subsequent resource-specific analyses.

  11. Assessment of the Effect of Different Isolation Systems on Seismic Response of a Nuclear Power Plant

    E-Print Network [OSTI]

    Wong, Jenna

    2014-01-01

    Diesel Generators." Nuclear Power International MagazineIsolation Structure for Nuclear Power Plant, Japan ElectricIsolation System for Nuclear Power Plants, JEAG 4614-2000,

  12. Assessment of potential doses to workers during postulated accident conditions at the Waste Isolation Pilot Plant

    SciTech Connect (OSTI)

    Hoover, M.D.; Newton, G.J. [Inhalation Toxicology Research Inst., Albuquerque, NM (United States); Farrell, R.F. [Dept. of Energy, Carlsbad, NM (United States)

    1996-06-01

    This qualitative hazard evaluation systematically assessed potential doses to workers during postulated accident conditions at the U.S. Department of Energy`s Waste Isolation Pilot Plant (WIPP). Postulated accidents included the spontaneous ignition of a waste drum, puncture of a waste drum by a forklift, dropping of a waste drum from a forklift, and simultaneous dropping of seven drums during a crane failure. The descriptions and estimated frequencies of occurrence for these accidents were developed by the Hazard and Operability Study for CH TRU Waste Handling System (WCAP 14312). The estimated materials at risk, damage ratios, airborne release fractions and respirable fractions for these accidents were taken from the 1995 Safety Analysis Report (SAR) update and from the DOE handbook Airborne Release Fractions/Rates and Respirable Fractions for Nonreactor Nuclear Facilities (DOE-HDBK-3010-94). A Monte Carlo simulation was used to estimate the range of worker exposures that could result from each accident. Guidelines for evaluating the adequacy of defense-in-depth for worker protection at WIPP were adopted from a scheme presented by the International Commission on Radiological Protection in its publication on Protection from Potential Exposure: A Conceptual Framework (ICRP Publication 64). Probabilities of exposures greater than 5, 50, and 300 rem were less than 10{sup -2}, 10{sup -4}, and 10{sup -6} per year, respectively. In conformance with the guidance of DOE standard 3009-94, Appendix A (draft), we emphasize that use of these evaluation guidelines is not intended to imply that these numbers constitute acceptable limits for worker exposure under accident conditions. However, in conjunction with the extensive safety assessment in the 1995 SAR update, these results indicate that the Carlsbad Area Office strategy for the assessment of hazards and accidents assures the protection of workers, as well as members of the public and the environment.

  13. Pechiney Rolled Products: Plant-Wide Energy Assessment Identifies Opportunities to Optimize Aluminum Casting and Rolled Operations

    SciTech Connect (OSTI)

    2004-07-01

    A Pechiney Rolled Products plant focused on various aluminum casting processes during a PWA. The assessment revealed potential annual savings of 460,000 MMBtu in natural gas, 9.6 million kWh in electricity, 69 million pounds in CO2, and $2.5 million.

  14. What Does Self-Assessment of Safety Culture Look Like? Discussion from the Pantex Plant Perspective

    Broader source: Energy.gov [DOE]

    Presenter: Dr. Suzanne Helfinstine, Staff Engineer High Reliability Operations B&W Pantex Pantex Plant

  15. A Conceptual Framework and Belief-Function Approach to Assessing Overall Information Quality

    E-Print Network [OSTI]

    Bovee, Matthew; Srivastava, Rajendra P.; Mak, Brenda

    2003-01-01

    of quality parameters. Two algorithms for combining assessments into an overall IQ measure are explored, and examples in the domain of medical information are used to illustrate key concepts. We discuss two scenarios, ‘online-user’ and ‘assurance...

  16. Review results of a BWR standard plant PRA and an assessment of potential benefits from design modifications

    SciTech Connect (OSTI)

    Shiu, K.; Hanan, N.; Rubin, M.

    1985-01-01

    Brookhaven National Laboratory (BNL) has participated in the review of the GESSAR II Standard Boiling Water Reactor (BWR) Plant probabilistic risk assessment (PRA). One major objective of this review was to utilize the PRA as a tool for investigation of the relative benefits available for incorporation of various proposed modifications to the baseline design. This paper presents the findings of the BNL review and assessment of the impact upon core damage frequency from two suggested design modifications. This work was restricted to consideration of interal events only. Review results indicated that the point estimate core damage frequency of the GESSAR II plant is equal to 2.2 x 10/sup -5//reactor-year for a plant site located within the Mid-Atlantic Area Council Grid (MAAC) and 3.8 x 10/sup -5//reactor-year if the national average loss of offsite power initiator frequency is used.

  17. Preliminary performance assessment for the Waste Isolation Pilot Plant, December 1992. Volume 3, Model parameters: Sandia WIPP Project

    SciTech Connect (OSTI)

    Not Available

    1992-12-29

    This volume documents model parameters chosen as of July 1992 that were used by the Performance Assessment Department of Sandia National Laboratories in its 1992 preliminary performance assessment of the Waste Isolation Pilot Plant (WIPP). Ranges and distributions for about 300 modeling parameters in the current secondary data base are presented in tables for the geologic and engineered barriers, global materials (e.g., fluid properties), and agents that act upon the WIPP disposal system such as climate variability and human-intrusion boreholes. The 49 parameters sampled in the 1992 Preliminary Performance Assessment are given special emphasis with tables and graphics that provide insight and sources of data for each parameter.

  18. Computer Science and Computer Information Systems Faculty: M. Branton, H. ElAarag, D. Plante, H. Pulapaka

    E-Print Network [OSTI]

    Miles, Will

    Computer Science and Computer Information Systems Faculty: M. Branton, H. ElAarag, D. Plante, H they can concentrate in one of two defined degree tracks, Computer Science and Computer Information Systems degree in Computer Science or in Computer Information Systems, as appropriate. The Computer Science track

  19. Weaving Versus Blending: a quantitative assessment of the information carrying capacities of two alternative methods for

    E-Print Network [OSTI]

    Healey, Christopher G.

    as the number of components increases from 4 to 6. We found no significant advantages, in either color blendingWeaving Versus Blending: a quantitative assessment of the information carrying capacities of two: color blending and color weaving. We begin with a baseline experiment in which we assess participants

  20. How information resources are used by federal agencies in risk assessment application: Rapporteur summary

    SciTech Connect (OSTI)

    Fenner-Crisp, P.

    1990-12-31

    The application of information available for risk assessment from the federal perspective is described. Different federal agencies conduct varying degrees of hazard evaluation, and some also generate empirical data. The role of the Agency for Toxic Substances and Disease Registry in hazard assessments of potential public health impacts of Superfund sites includes identification of the 275 most significant substances. ATSDR is responsible for preparing toxicological profiles. ATSDR also identifies data gaps and needs critical to adequately assessing human health impacts.

  1. FUNCTION OF PHLOEM-BORNE INFORMATION MACROMOLECULES IN INTEGRATING PLANT GROWTH & DEVELOPMENT

    SciTech Connect (OSTI)

    William J. Lucas

    2012-11-12

    Studies on higher plants have revealed the operation of cell-to-cell and long-distance communication networks that mediate the transport of information macromolecules, such as proteins and RNA. Based on the findings from this DOE-funded project and results from other groups, it is now well established that the enucleate sieve tube system of the angiosperms contains a complex set of proteins including RNA binding proteins as well as a unique population of RNA molecules, comprised of both mRNA and small RNA species. Hetero-grafting experiments demonstrated that delivery of such RNA molecules, into the scion, is highly correlated with changes in developmental phenotypes. Furthermore, over the course of this project, our studies showed that plasmodesmata and the phloem are intimately involved in the local and systemic spread of sequence-specific signals that underlie gene silencing in plants. Major advances were also made in elucidating the underlying mechanisms that operate to mediate the selective entry and exit of proteins and RNA into and out of the phloem translocation stream. Our pioneering studies identified the first plant protein with the capacity to both bind specifically to small RNA molecules (si-RNA) and mediate in the cell-to-cell movement of such siRNA. Importantly, studies conducted with support from this DOE program also yielded a detailed characterization of the first phloem-mobile RNP complex isolated from pumpkin, namely the CmRBP50-RNP complex. This RNP complex was shown to bind, in a sequence-specific manner, to a set of transcripts encoding for transcription factors. The remarkable stability of this CmRBP50-RNP complex allows for long-distance delivery of bound transcripts from mature leaves into developing tissues and organs. Knowledge gained from this project can be used to exert control over the long-distance signaling networks used by plants to integrate their physiological and developmental programs at a whole plant level. Eventually, this information will aid in the engineering of elite plant lines with optimal traits for plant growth under non-ideal conditions, enhanced biomass and/or seed yield, and directed carbon allocation for efficient and sustainable biofuels production.

  2. Structural aging program to assess the adequacy of critical concrete components in nuclear power plants

    SciTech Connect (OSTI)

    Naus, D.J.; Marchbanks, M.F.; Oland, C.B.; Arndt, E.G.

    1989-01-01

    The Structural Aging (SAG) Program is carried out by the Oak Ridge National Laboratory (ORNL) under sponsorship of the United States Nuclear Regulatory Commission (USNRC). The Program has evolved from preliminary studies conducted to evaluate the long-term environmental challenges to light-water reactor safety-related concrete civil structures. An important conclusion of these studies was that a damage methodology, which can provide a quantitative measure of a concrete structure's durability with respect to potential future requirements, needs to be developed. Under the SAG Program, this issue is being addressed through: establishment of a structural materials information center, evaluation of structural component assessment and repair technologies, and development of a quantitative methodology for structural aging determinations. Progress to date of each of these activities is presented as well as future plans. 7 refs., 5 figs.

  3. Renewable Energy Assessment of Bureau of Reclamation Land and Facilities Using Geographic Information Systems

    SciTech Connect (OSTI)

    Heimiller, D.; Haase, S.; Melius, J.

    2013-05-01

    This report summarizes results of geographic information system screening for solar and wind potential at select Bureau of Reclamation lands in the western United States. The study included both utility-scale and facility-scale potential. This study supplements information in the report titled Renewable Energy Assessment for the Bureau of Reclamation: Final Report.

  4. Incorporating long-term climate change in performance assessment for the Waste Isolation Pilot Plant

    SciTech Connect (OSTI)

    Swift, P.N. [Sandia National Labs., Albuquerque, NM (United States); Baker, B.L. [Technadyne Engineering Consultants, Inc., Albuquerque, NM (United States); Economy, K. [Ecodynamics Research Associates, Albuquerque, NM (United States); Garner, J.W. [Applied Physics, Inc., Albuquerque, NM (United States); Helton, J.C. [Arizona State Univ., Tempe, AZ (United States); Rudeen, D.K. [New Mexico Engineering Research Institute, Albuquerque, NM (United States)

    1994-03-01

    The United States Department of Energy (DOE) is developing the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico for the disposal of transuranic wastes generated by defense programs. Applicable regulations (40 CFR 191) require the DOE to evaluate disposal-system performance for 10,000 yr. Climatic changes may affect performance by altering groundwater flow. Paleoclimatic data from southeastern New Mexico and the surrounding area indicate that the wettest and coolest Quaternary climate at the site can be represented by that at the last glacial maximum, when mean annual precipitation was approximately twice that of the present. The hottest and driest climates have been similar to that of the present. The regularity of global glacial cycles during the late Pleistocene confirms that the climate of the last glacial maximum is suitable for use as a cooler and wetter bound for variability during the next 10,000 yr. Climate variability is incorporated into groundwater-flow modeling for WIPP PA by causing hydraulic head in a portion of the model-domain boundary to rise to the ground surface with hypothetical increases in precipitation during the next 10,000 yr. Variability in modeled disposal-system performance introduced by allowing had values to vary over this range is insignificant compared to variability resulting from other causes, including incomplete understanding of transport processes. Preliminary performance assessments suggest that climate variability will not affect regulatory compliance.

  5. Assessment of Expert Opinion: Seasonal Sheep Preference and Plant Response to Grazing 

    E-Print Network [OSTI]

    Pollock, Meg L; Legg, Colin J; Holland, John P; Theobald, Chris M

    2007-01-01

    Expert opinion was sought on two issues relating to herbivory: seasonal sheep preferences for plant species and seasonal plant response to grazing. Expert opinion is commonly used to parameterize models: it is therefore ...

  6. Geothermal Resources Assessment In Hawaii | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainable UrbanKentucky:Bore TechnologiesAssessment In Hawaii Jump to: navigation,

  7. European Commission Impact Assessment Tools | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LISTStar2-0057-EA Jump to:ofEnia SpA Jump to:EnergyEthanolEurelImpact Assessment Tools

  8. China-DLR Resource Assessments | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmentalBowerbank,CammackFLIR JumpMaine:WestTexas: EnergyExportDLR Resource Assessments Jump

  9. Transportation Assessment Toolkit/Home | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEt Al., 2013)OpenEnergyTrail Canyonsource History ViewCase

  10. Space Nuclear Power Plant Pre-Conceptual Design Report, For Information

    SciTech Connect (OSTI)

    B. Levine

    2006-01-27

    This letter transmits, for information, the Project Prometheus Space Nuclear Power Plant (SNPP) Pre-Conceptual Design Report completed by the Naval Reactors Prime Contractor Team (NRPCT). This report documents the work pertaining to the Reactor Module, which includes integration of the space nuclear reactor with the reactor radiation shield, energy conversion, and instrumentation and control segments. This document also describes integration of the Reactor Module with the Heat Rejection segment, the Power Conditioning and Distribution subsystem (which comprise the SNPP), and the remainder of the Prometheus spaceship.

  11. Access and use of information resources in assessing health risks from chemical exposure: Proceedings

    SciTech Connect (OSTI)

    Not Available

    1990-12-31

    Health risk assessment is based on access to comprehensive information about potentially hazardous agents in question. Relevant information is scattered throughout the literature, and often is not readily accessible. To be useful in assessment efforts, emerging scientific findings, risk assess parameters, and associated data must be compiled and evaluated systemically. The US Environmental Protection Agency (EPA) and Oak Ridge National Laboratory (ORNL) are among the federal agencies heavily involved in this effort. This symposium was a direct response by EPA and ORNL to the expressed needs of individuals involved in assessing risks from chemical exposure. In an effort to examine the state of the risk assessment process, the availability of toxicological information, and the future development and transfer of this information, the symposium provided an excellent cadre of speakers and participants from state and federal agencies, academia and research laboratories to address these topics. This stimulating and productive gathering discussed concerns associated with (1) environmental contamination by chemicals; (2) laws regulating chemicals; (3) information needs and resources; (4) applications; (5) challenges and priorities; and (6)future issues. Individual reports are processed separately for the data bases.

  12. Solar and Wind Energy Resource Assessment (SWERA) | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-Enhancing Capacity forSilicium deEnergyCompany Limited SPCSolarVision JumpWorld

  13. Bangladesh-DLR Resource Assessments | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EAandAmminex AAustriaBiofuelsOpen Energy Informationclock time hourlyDLR

  14. Algeria-DLR Resource Assessments | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EAand DaltonSolarOpen5 -TelephoneInformation Alger

  15. Liberia-NREL Biomass Resource Assessment | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIXsource History ViewInformationWinds JumpOxiranchem Inc Jump to:

  16. Assessment of RELAP5/MOD2 against a main feedwater turbopump trip transient in the Vandellos II Nuclear Power Plant

    SciTech Connect (OSTI)

    Llopis, C.; Casals, A.; Perez, J.; Mendizabal, R.

    1993-12-01

    The Consejo de Seguridad Nuclear (CSN) and the Asociacion Nuclear Vandellos (ANV) have developed a model of Vandellos II Nuclear Power Plant. The ANV collaboration consisted in the supply of design and actual data, the cooperation in the simulation of the control systems and other model components, as well as in the results analysis. The obtained model has been assessed against the following transients occurred in plant: A trip from the 100% power level (CSN); a load rejection from 100% to 50% (CSN); a load rejection from 75% to 65% (ANV); and, a feedwater turbopump trip (ANV). This copy is a report of the feedwater turbopump trip transient simulation. This transient actually occurred in the plant on June 19, 1989.

  17. A TECHNICAL, ECONOMIC AND ENVIRONMENTAL ASSESSMENT OF AMINE-BASED CO2 CAPTURE TECHNOLOGY FOR POWER PLANT GREENHOUSE GAS CONTROL

    SciTech Connect (OSTI)

    Edward S. Rubin; Anand B. Rao

    2002-10-01

    Capture and sequestration of CO{sub 2} from fossil fuel power plants is gaining widespread interest as a potential method of controlling greenhouse gas emissions. Performance and cost models of an amine (MEA)-based CO{sub 2} absorption system for post-combustion flue gas applications have been developed, and integrated with an existing power plant modeling framework that includes multi-pollutant control technologies for other regulated emissions. The integrated model has been applied to study the feasibility and cost of carbon capture and sequestration at both new and existing coal-burning power plants. The cost of carbon avoidance was shown to depend strongly on assumptions about the reference plant design, details of the CO{sub 2} capture system design, interactions with other pollution control systems, and method of CO{sub 2} storage. The CO{sub 2} avoidance cost for retrofit systems was found to be generally higher than for new plants, mainly because of the higher energy penalty resulting from less efficient heat integration, as well as site-specific difficulties typically encountered in retrofit applications. For all cases, a small reduction in CO{sub 2} capture cost was afforded by the SO{sub 2} emission trading credits generated by amine-based capture systems. Efforts are underway to model a broader suite of carbon capture and sequestration technologies for more comprehensive assessments in the context of multi-pollutant environmental management.

  18. Use of information resources by the state of Tennessee in risk assessment applications

    SciTech Connect (OSTI)

    Bashor, B.S.

    1990-12-31

    The major resources used by the Bureau of Environment, and Environmental Epidemiology (EEP) for risk assessment are: the Integrated Risk Information System (IRIS), Health and Environmental Effects Summary Table (HEAST), Agency for Toxic Substances and disease Registry (ATSDR) Toxicological Profiles, databases at the National Library of Medicine (NLM), World Health Organization (WHO) ENvironmental Criteria, and documents that the Environmental Protection Agency (EPA) has published on Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) risk assessment activities. The Risk Assessment Review has been helpful in providing information about availability of new documents or information. No systematic method has been made available to us to locate information resources. IRIS User`s Support has been helpful in making appropriate and timely referrals. Most other EPA resources were located by serendipity and persistence. The CERCLA methodology for risk assessments is being used in environmental programs, and at present, one person is responsible for all risk assessment activities in the department, but plans are underway to train one or two people from each program area. 2 figs.

  19. Measuring the Efficacy of Leaders to Assess Information and Make Decisions in a Crisis: The C-LEAD Scale

    E-Print Network [OSTI]

    Pittinsky, Todd L.

    2009-07-01

    Based on literature and expert interviews, we developed the Crisis Leader Efficacy in Assessing and Deciding scale (C-LEAD) to capture the efficacy of leaders to assess information and make decisions in a public health and ...

  20. Assessing Available Woody Plant Biomass on Rangelands with Lidar and Multispectral Remote Sensing 

    E-Print Network [OSTI]

    Ku, Nian-Wei

    2012-07-16

    products. Mesquite trees, a type of woody plant, are a proven source of bioenergy feedstock found on semi-arid lands. The overall objectives of this study were to develop algorithms for determining woody plant biomass on rangelands in Texas at plot...

  1. Using Process Load Cell Information for IAEA Safeguards at Enrichment Plants

    SciTech Connect (OSTI)

    Laughter, Mark D; Whitaker, J Michael; Howell, John

    2010-01-01

    Uranium enrichment service providers are expanding existing enrichment plants and constructing new facilities to meet demands resulting from the shutdown of gaseous diffusion plants, the completion of the U.S.-Russia highly enriched uranium downblending program, and the projected global renaissance in nuclear power. The International Atomic Energy Agency (IAEA) conducts verification inspections at safeguarded facilities to provide assurance that signatory States comply with their treaty obligations to use nuclear materials only for peaceful purposes. Continuous, unattended monitoring of load cells in UF{sub 6} feed/withdrawal stations can provide safeguards-relevant process information to make existing safeguards approaches more efficient and effective and enable novel safeguards concepts such as information-driven inspections. The IAEA has indicated that process load cell monitoring will play a central role in future safeguards approaches for large-scale gas centrifuge enrichment plants. This presentation will discuss previous work and future plans related to continuous load cell monitoring, including: (1) algorithms for automated analysis of load cell data, including filtering methods to determine significant weights and eliminate irrelevant impulses; (2) development of metrics for declaration verification and off-normal operation detection ('cylinder counting,' near-real-time mass balancing, F/P/T ratios, etc.); (3) requirements to specify what potentially sensitive data is safeguards relevant, at what point the IAEA gains on-site custody of the data, and what portion of that data can be transmitted off-site; (4) authentication, secure on-site storage, and secure transmission of load cell data; (5) data processing and remote monitoring schemes to control access to sensitive and proprietary information; (6) integration of process load cell data in a layered safeguards approach with cross-check verification; (7) process mock-ups constructed to provide simulated load cell data; (8) hardware and software implementation for process load cell data collection; (9) costs associated with unattended monitoring of load cells (for both operator and inspector) weighed against the potential benefits of having access to such data; (10) results from field tests of load cell data collection systems in operating facilities; and (11) use of unattended load cell data to increase efficiency of on-site inspection schedules and activities.

  2. Osiris and SOMBRERO inertial confinement fusion power plant designs. Volume 2, Designs, assessments, and comparisons, Final report

    SciTech Connect (OSTI)

    Meier, W.R.; Bieri, R.L.; Monsler, M.J.

    1992-03-01

    The primary objective of the of the IFE Reactor Design Studies was to provide the Office of Fusion Energy with an evaluation of the potential of inertial fusion for electric power production. The term reactor studies is somewhat of a misnomer since these studies included the conceptual design and analysis of all aspects of the IFE power plants: the chambers, heat transport and power conversion systems, other balance of plant facilities, target systems (including the target production, injection, and tracking systems), and the two drivers. The scope of the IFE Reactor Design Studies was quite ambitious. The majority of our effort was spent on the conceptual design of two IFE electric power plants, one using an induction linac heavy ion beam (HIB) driver and the other using a Krypton Fluoride (KrF) laser driver. After the two point designs were developed, they were assessed in terms of their (1) environmental and safety aspects; (2) reliability, availability, and maintainability; (3) technical issues and technology development requirements; and (4) economics. Finally, we compared the design features and the results of the assessments for the two designs.

  3. Project Information Form Project Title Program for Vehicle Regulatory Reform: Assessing Life Cycle-Based

    E-Print Network [OSTI]

    California at Davis, University of

    Project Information Form Project Title Program for Vehicle Regulatory Reform: Assessing Life Cycle vehicle production emissions and other life cycle emissions. Non- operation emissions are more dominant the need, effectiveness, and policy strategies for capturing life cycle vehicle emissions in LDV GHG

  4. User Needs Assessment of Information Seeking Activities of MIT Students - Spring 2006

    E-Print Network [OSTI]

    Hennig, Nicole

    2006-07-17

    The SFX/Verde Group was authorized to complete a user needs assessment in the form of a Photo Diary Study with MIT students in the spring of 2006. The goal of the study was to inform the MIT Libraries of online tool ...

  5. Mathematical modeling of positron emission tomography (PET) data to assess radiofluoride transport in living plants following petiolar administration

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Converse, Alexander K.; Ahlers, Elizabeth O.; Bryan, Tom W.; Hetue, Jackson D.; Lake, Katherine A.; Ellison, Paul A.; Engle, Jonathan W.; Barnhart, Todd E.; Nickles, Robert J.; Williams, Paul H.; et al

    2015-03-15

    Background: Ion transport is a fundamental physiological process that can be studied non-invasively in living plants with radiotracer imaging methods. Fluoride is a known phytotoxic pollutant and understanding its transport in plants after leaf absorption is of interest to those in agricultural areas near industrial sources of airborne fluoride. Here we report the novel use of a commercial, high-resolution, animal positron emission tomography (PET) scanner to trace a bolus of [¹?F]fluoride administered via bisected petioles of Brassica oleracea, an established model species, to simulate whole plant uptake of atmospheric fluoride. This methodology allows for the first time mathematical compartmental modelingmore »of fluoride transport in the living plant. Radiotracer kinetics in the stem were described with a single-parameter free- and trapped-compartment model and mean arrival times at different stem positions were calculated from the free-compartment time-activity curves. Results: After initiation of administration at the bisected leaf stalk, [¹?F] radioactivity climbed for approximately 10 minutes followed by rapid washout from the stem and equilibration within leaves. Kinetic modeling of transport in the stem yielded a trapping rate of 1.5 +/- 0.3%/min (mean +/- s.d., n = 3), velocity of 2.2 +/- 1.1 cm/min, and trapping fraction of 0.8 +/- 0.5%/cm. Conclusion: Quantitative assessment of physiologically meaningful transport parameters of fluoride in living plants is possible using standard positron emission tomography in combination with petiolar radiotracer administration. Movement of free fluoride was observed to be consistent with bulk flow in xylem, namely a rapid and linear change in position with respect to time. Trapping, likely in the apoplast, was observed. Future applications of the methods described here include studies of transport of other ions and molecules of interest in plant physiology.« less

  6. Mathematical modeling of positron emission tomography (PET) data to assess radiofluoride transport in living plants following petiolar administration

    SciTech Connect (OSTI)

    Converse, Alexander K. [Univ. of Wisconsin, Madison, WI (United States); Ahlers, Elizabeth O. [Univ. of Wisconsin, Madison, WI (United States); Bryan, Tom W. [Univ. of Wisconsin, Madison, WI (United States); Hetue, Jackson D. [Univ. of Wisconsin, Madison, WI (United States); Lake, Katherine A. [Univ. of Wisconsin, Madison, WI (United States); Ellison, Paul A. [Univ. of Wisconsin, Madison, WI (United States); Engle, Jonathan W. [Univ. of Wisconsin, Madison, WI (United States); Barnhart, Todd E. [Univ. of Wisconsin, Madison, WI (United States); Nickles, Robert J. [Univ. of Wisconsin, Madison, WI (United States); Williams, Paul H. [Univ. of Wisconsin, Madison, WI (United States); DeJesus, Onofre T. [Univ. of Wisconsin, Madison, WI (United States)

    2015-01-01

    Background: Ion transport is a fundamental physiological process that can be studied non-invasively in living plants with radiotracer imaging methods. Fluoride is a known phytotoxic pollutant and understanding its transport in plants after leaf absorption is of interest to those in agricultural areas near industrial sources of airborne fluoride. Here we report the novel use of a commercial, high-resolution, animal positron emission tomography (PET) scanner to trace a bolus of [¹?F]fluoride administered via bisected petioles of Brassica oleracea, an established model species, to simulate whole plant uptake of atmospheric fluoride. This methodology allows for the first time mathematical compartmental modeling of fluoride transport in the living plant. Radiotracer kinetics in the stem were described with a single-parameter free- and trapped-compartment model and mean arrival times at different stem positions were calculated from the free-compartment time-activity curves. Results: After initiation of administration at the bisected leaf stalk, [¹?F] radioactivity climbed for approximately 10 minutes followed by rapid washout from the stem and equilibration within leaves. Kinetic modeling of transport in the stem yielded a trapping rate of 1.5 +/- 0.3%/min (mean +/- s.d., n = 3), velocity of 2.2 +/- 1.1 cm/min, and trapping fraction of 0.8 +/- 0.5%/cm. Conclusion: Quantitative assessment of physiologically meaningful transport parameters of fluoride in living plants is possible using standard positron emission tomography in combination with petiolar radiotracer administration. Movement of free fluoride was observed to be consistent with bulk flow in xylem, namely a rapid and linear change in position with respect to time. Trapping, likely in the apoplast, was observed. Future applications of the methods described here include studies of transport of other ions and molecules of interest in plant physiology.

  7. Assessment of light water reactor power plant cost and ultra-acceleration depreciation financing

    E-Print Network [OSTI]

    El-Magboub, Sadek Abdulhafid.

    Although in many regions of the U.S. the least expensive electricity is generated from light-water reactor (LWR) plants, the fixed (capital plus operation and maintenance) cost has increased to the level where the cost ...

  8. Probabilistic methods in seismic risk assessment for nuclear power plants: proceedings

    SciTech Connect (OSTI)

    Not Available

    1983-01-01

    The state-of-the-art in seismic risk analysis applied to the design and siting of nuclear power plants was addressed in this meeting. Presentations were entered individually into the date base. (ACR)

  9. Assessment of LWR piping design loading based on plant operating experience

    SciTech Connect (OSTI)

    Svensson, P. O.

    1980-08-01

    The objective of this study has been to: (1) identify current Light Water Reactor (LWR) piping design load parameters, (2) identify significant actual LWR piping loads from plant operating experience, (3) perform a comparison of these two sets of data and determine the significance of any differences, and (4) make an evaluation of the load representation in current LWR piping design practice, in view of plant operating experience with respect to piping behavior and response to loading.

  10. LWR Sustainability: Assessment of Aging of Nuclear Power Plant Safety Related Concrete Strutures

    SciTech Connect (OSTI)

    Graves III, Herman; Naus, Dan J

    2013-01-01

    Current regulatory testing and inspection requirements are reviewed and a summary of degradation experience is presented. Techniques commonly used to inspect NPP concrete structures to assess and quantify age-related degradation are summarized. An approach for conduct of condition assessments of structures in NPPs is presented. Criteria, based primarily on visual indications, are provided for use in classification and assessment of concrete degradation. Materials and techniques for repair of degraded structures are generally discussed.

  11. Information resources for assessing health effects from chemical exposure: Challenges, priorities, and future issues

    SciTech Connect (OSTI)

    Seigel, S.

    1990-12-31

    Issues related to developing information resources for assessing the health effects from chemical exposure include the question of how to address the individual political issues relevant to identifying and determining the timeliness, scientific credibility, and completeness of such kinds of information resources. One of the important ways for agencies to share information is through connection tables. This type of software is presently being used to build information products for some DHHS agencies. One of the challenges will be to convince vendors of data of the importance of trying to make data files available to communities that need them. In the future, information processing will be conducted with neural networks, object-oriented database management systems, and fuzzy-set technologies, and meta analysis techniques.

  12. Fire Protection Program Assessment, Building 9203 & 9203A Complex- Y12 Plant, Oak Ridge, Tennessee

    Broader source: Energy.gov [DOE]

    This assessment is intended to evaluate the fire hazards, life safety and fire protection features inherent in the Building 9203 and 9203A complex.

  13. Capital and operating cost estimates. Volume I. Preliminary design and assessment of a 12,500 BPD coal-to-methanol-to-gasoline plant. [Grace C-M-G Plant, Henderson County, Kentucky

    SciTech Connect (OSTI)

    Not Available

    1982-08-01

    This Deliverable No. 18b - Capital and Operating Cost Estimates includes a detailed presentation of the 12,500 BPD coal-to-methanol-to-gasoline plant from the standpoint of capital, preoperations, start-up and operations cost estimation. The base capital cost estimate in June 1982 dollars was prepared by the Ralph M. Parsons Company under the direction of Grace. The escalated capital cost estimate as well as separate estimates for preoperations, startup and operations activities were developed by Grace. The deliverable consists of four volumes. Volume I contains details of methodology used in developing the capital cost estimate, summary information on a base June 1982 capital cost, details of the escalated capital cost estimate and separate sections devoted to preoperations, start-up, and operations cost. The base estimate is supported by detailed information in Volumes II, III and IV. The degree of detail for some units was constrained due to proprietary data. Attempts have been made to exhibit the estimating methodology by including data on individual equipment pricing. Proprietary details are available for inspection upon execution of nondisclosure and/or secrecy agreements with the licensors to whom the data is proprietary. Details of factoring certain pieces of equipment and/or entire modules or units from the 50,000 BPD capital estimate are also included. In the case of the escalated capital estimate, Grace has chosen to include a sensitivity analysis which allows for ready assessment of impacts of escalation rates (inflation), contingency allowances and the construction interest financing rates on the escalated capital cost. Each of the estimates associated with bringing the plant to commercial production rates has as a basis the schedule and engineering documentation found in Deliverable No. 14b - Process Engineering and Mechanical Design Report, No. 28b - Staffing Plans, No. 31b - Construction Plan, and No. 33b - Startup and Operation Plan.

  14. PVGIS approach for assessing the performances of the first PV grid-connected power plant in Morocco

    E-Print Network [OSTI]

    Barhdadi, Abdelfettah

    2012-01-01

    In this paper, we apply the PVGIS method for estimating the performance of the first grid-connected PV micro-power plant in Morocco. PVGIS approach provides analysis and assessment of in-site solar energy resources and predicts with good accuracy the potential of PV systems in term of electricity production. We find that annual total power generation of the micro-power is slightly higher than that initially expected at the installation stage and actually measured. The yearly predicted and measured power production values agree to about 2 %. However, individual monthly production can have larger discrepancy.

  15. Developing and assessing accident management plans for nuclear power plants. Evaluation of a prototype process: Volume 2

    SciTech Connect (OSTI)

    Hanson, D.J.; Johnson, S.P.; Blackman, H.S.; Stewart, M.A. [EG and G Idaho, Inc., Idaho Falls, ID (United States)

    1992-07-01

    This document is the second of a two-volume NUREG/CR that discusses development of accident management plans for nuclear power plants. The first volume (a) describes a four-phase approach for developing criteria that could be used for assessing the adequacy of accident management plans, (b) identifies the general attributes of accident management plans (Phase 1), (c) presents a prototype process for developing and implementing severe accident management plans (Phase 2), and (d) presents criteria that can be used to assess the adequacy of accident management plans. This volume (a) describes results from an evaluation of the capabilities of the prototype process to produce an accident management plan (Phase 3) and (b), based on these results and preliminary criteria included in NUREG/CR-5543, presents modifications to the criteria where appropriate.

  16. Natural Circulation in Water Cooled Nuclear Power Plants Phenomena, models, and methodology for system reliability assessments

    SciTech Connect (OSTI)

    Jose Reyes

    2005-02-14

    In recent years it has been recognized that the application of passive safety systems (i.e., those whose operation takes advantage of natural forces such as convection and gravity), can contribute to simplification and potentially to improved economics of new nuclear power plant designs. In 1991 the IAEA Conference on ''The Safety of Nuclear Power: Strategy for the Future'' noted that for new plants the use of passive safety features is a desirable method of achieving simplification and increasing the reliability of the performance of essential safety functions, and should be used wherever appropriate''.

  17. Assessment of RELAP5/MOD2 code using loss of offsite power transient data of KNU (Korea Nuclear Unit) No. 1 Plant

    SciTech Connect (OSTI)

    Chung, Bud-Dong; Kim, Hho-Jung . Korea Nuclear Safety Center); Lee, Young-Jin )

    1990-04-01

    This report presents a code assessment study based on a real plant transient that occurred on June 9, 1981 at the KNU {number sign}1 (Korea Nuclear Unit Number 1). KNU {number sign}1 is a two-loop Westinghouse PWR plant of 587 Mwe. The loss of offsite power transient occurred at the 77.5% reactor power with 0.5%/hr power ramp. The real plant data were collected from available on-line plant records and computer diagnostics. The transient was simulated by RELAP5/MOD2/36.05 and the results were compared with the plant data to assess the code weaknesses and strengths. Some nodalization studies were performed to contribute to developing a guideline for PWR nodalization for the transient analysis. 5 refs., 18 figs., 3 tabs.

  18. Socioeconomic impact assessment and nuclear power plant licensing, Greene County, New York

    SciTech Connect (OSTI)

    Peelle, E.

    1980-01-01

    The paper reviews the setting, participants and status of the joint federal-state hearings, findings of the FES, problems of conducting social impact assessment (SIA) for the GCNPP, and the nature and effect of public participation in the formal, legalistic hearings process. The GCNPP is evaluated in terms of trends in Atomic Energy Commission-Nuclear Regulatory Commission social impact assessments from 1972 to 1979. Progress in the adequacy and relevance of social impact assessment is defined according to steps in a lengthy, evolutionary legitimation process.

  19. 29.01.03.M1.26 Information Resources Security Risks Assessment Reviews Page 1 of 3 STANDARD ADMINISTRATIVE PROCEDURE

    E-Print Network [OSTI]

    29.01.03.M1.26 Information Resources ­ Security Risks Assessment Reviews Page 1 of 3 STANDARD ADMINISTRATIVE PROCEDURE 29.01.03.M1.26 Information Resources ­ Information Security Risk Assessment Reviews with assurance that the information on which risk assessment assertions are made is correct. The goal

  20. PLUTONIUM UPTAKE AND BEHAVIOR IN PLANTS OF THE DESERT SOUTHWEST: A PRELIMINARY ASSESSMENT

    SciTech Connect (OSTI)

    Caldwell, E.; Duff, M.; Ferguson, C.

    2011-03-01

    Eight species of desert vegetation and associated soils were collected from the Nevada National Security Site (N2S2) and analyzed for 238Pu and 239+240Pu concentrations. Amongst the plant species sampled were: atmospheric elemental accumulators (moss and lichen), the very slow growing, long-lived creosote bush and the rapidly growing, short-lived cheatgrass brome. The diversity of growth strategies provided insight into the geochemical behavior and bio-availability of Pu at the N2S2. The highest concentrations of Pu were measured in the onion moss (24.27 Bq kg-1 238Pu and 52.78 Bq kg-1 239+240Pu) followed by the rimmed navel lichen (8.18 Bq kg-1 and 18.4 Bq kg-1 respectively), pointing to the importance of eolian transport of Pu. Brome and desert globemallow accumulated between 3 and 9 times higher concentrations of Pu than creosote and sage brush species. These results support the importance of species specific elemental accumulation strategies rather than exposure duration as the dominant variable influencing Pu concentrations in these plants. Total vegetation elemental concentrations of Ce, Fe, Al, Sm and others were also analyzed. Strong correlations were observed between Fe and Pu. This supports the conclusion that Pu was accumulated as a consequence of the active accumulation of Fe and other plant required nutrients. Cerium and Pu are considered to be chemical analogs. Strong correlations observed in plants support the conclusion that these elements displayed similar geochemical behavior in the environment as it related to the biochemical uptake process of vegetation. Soils were also sampled in association with vegetation samples. This allowed for the calculation of a concentration ratio (CR). The CR values for Pu in plants were highly influenced by the heterogeneity of Pu distribution among sites. Results from the naturally occurring elements of concern were more evenly distributed between sample sites. This allowed for the development of a pattern of plant species that accumulated Ce, Sm, Fe and Al. The highest accumulators of these elements were onion moss, lichen flowed by brome. The lowest accumulators were creosote bush and fourwing saltbush. This ranked order corresponds to plant accumulations of Pu.

  1. Valero: Houston Refinery Uses Plant-Wide Assessment to Develop an Energy Optimization and Management System

    SciTech Connect (OSTI)

    2005-08-01

    This Industrial Technologies Program case study describes an energy assessment team's recommendations for saving $5 million in energy, water, and other costs at an oil refinery in Houston, Texas.

  2. Assessment of sludge management options in a waste water treatment plant

    E-Print Network [OSTI]

    Lim, Jong hyun, M. Eng. Massachusetts Institute of Technology

    2012-01-01

    This thesis is part of a larger project which began in response to a request by the Spanish water agengy, Cadagua, for advice on life cycle assessment (LCA) and environmental impacts of Cadagua operated wastewater treatment ...

  3. Environmental assessment of the atlas bio-energy waste wood fluidized bed gasification power plant. Final report

    SciTech Connect (OSTI)

    Holzman, M.I.

    1995-08-01

    The Atlas Bio-Energy Corporation is proposing to develop and operate a 3 MW power plant in Brooklyn, New York that will produce electricity by gasification of waste wood and combustion of the produced low-Btu gas in a conventional package steam boiler coupled to a steam-electric generator. The objectives of this project were to assist Atlas in addressing the environmental permit requirements for the proposed power plant and to evaluate the environmental and economic impacts of the project compared to more conventional small power plants. The project`s goal was to help promote the commercialization of biomass gasification as an environmentally acceptable and economically attractive alternative to conventional wood combustion. The specific components of this research included: (1) Development of a permitting strategy plan; (2) Characterization of New York City waste wood; (3) Characterization of fluidized bed gasifier/boiler emissions; (4) Performance of an environmental impact analysis; (5) Preparation of an economic evaluation; and (6) Discussion of operational and maintenance concerns. The project is being performed in two phases. Phase I, which is the subject of this report, involves the environmental permitting and environmental/economic assessment of the project. Pending NYSERDA participation, Phase II will include development and implementation of a demonstration program to evaluate the environmental and economic impacts of the full-scale gasification project.

  4. Quality Assessment of Feeder Cattle and Processes Based on Available Background Information 

    E-Print Network [OSTI]

    Franke, Jake

    2013-01-18

    . These results indicate beef cattle producers must manage cows and calves to facilitate effective passive transfer of immunity. Similarly, Zimmerman et al. (2006) reported that a single dose of a modified live vaccine containing BVDV administered to calves...-1 QUALITY ASSESSMENT OF FEEDER CATTLE AND PROCESSES BASED ON AVAILABLE BACKGROUND INFORMATION A Dissertation by JAKE ANDREW FRANKE Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment...

  5. Do they agree? Bibliometric evaluation vs informed peer review in the Italian research assessment exercise

    E-Print Network [OSTI]

    Alberto, Baccini

    2015-01-01

    During the Italian research assessment exercise, the national agency ANVUR performed an experiment to assess agreement between grades obtained through informed peer review (IR) and bibliometrics. A sample was evaluated by using both methods and concordance was analyzed by weighted Cohen's kappas. According to ANVUR results indicated an overall "more than adequate" agreement which "fully justifies" the choice of using jointly both techniques in the assessment. However, according to available statistical guidelines for kappa values, the degree of agreement has to be interpreted, for all research fields, as poor or, in a few cases, as, at most, fair. The only notable exception is Area 13 (economics and statistics) and its sub-areas, showing moderate agreement. However, a statistical meta-analysis rejects the hypothesis that kappas from Area 13 share the same distribution as those from the other areas. In fact, a scrutiny of the experiment protocol adopted by the Area 13 panel highlights substantial modifications...

  6. Enterprise Assessments Review of the Pantex Plant Emergency Management Exercise Program Â… November 2015

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum12, 2015 Infographiclighbulbs -Immobilization Plant Low-Activity

  7. Ford Cleveland: Inside-Out Analysis Identifies Energy and Cost Savings Opportunities at Metal Casting Plant; Industrial Technologies Program Metal Casting BestPractices Plant-Wide Assessment Case Study

    SciTech Connect (OSTI)

    Not Available

    2003-09-01

    The Ford Cleveland Casting Plant used results from its plant-wide energy efficiency assessment to identify 16 energy- and cost-saving projects. These projects addressed combustion, compressed air, water, steam, motor drive, and lighting systems. When implemented, the projects should save a total of$3.28 million per year. In addition, two long-term projects were identified that together would represent another$9.5 million in cost savings.

  8. Baseline risk assessment for groundwater operable units at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    1999-07-14

    The U.S. Department of Energy (DOE) and the U.S. Department of the Army (DA) are evaluating conditions in groundwater and springs at the DOE chemical plant area and the DA ordnance works area near Weldon Spring, Missouri. The two areas are located in St. Charles County, about 48 km (30 mi) west of St. Louis. The 88-ha (217-acre) chemical plant area is chemically and radioactively contaminated as a result of uranium-processing activities conducted by the U.S. Atomic Energy Commission in the 1950s and 1960s and explosives-production activities conducted by the U.S. Army (Army) in the 1940s. The 6,974-ha (17,232-acre) ordnance works area is primarily chemically contaminated as a result of trinitrotoluene (TNT) and dinitrotoluene (DNT) manufacturing activities during World War II. This baseline risk assessment (BRA) is being conducted as part of the remedial investigation/feasibility study (RUFS) required under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended. The purpose of the BRA is to evaluate potential human health and ecological impacts from contamination associated with the groundwater operable units (GWOUs) of the chemical plant area and ordnance works area. An RI/FS work plan issued jointly in 1995 by the DOE and DA (DOE 1995) analyzed existing conditions at the GWOUs. The work plan included a conceptual hydrogeological model based on data available when the report was prepared; this model indicated that the aquifer of concern is common to both areas. Hence, to optimize further data collection and interpretation efforts, the DOE and DA have decided to conduct a joint RI/BRA. Characterization data obtained from the chemical plant area wells indicate that uranium is present at levels slightly higher than background, with a few concentrations exceeding the proposed U.S. Environmental Protection Agency (EPA) maximum contaminant level (MCL) of 20 {micro}g/L (EPA 1996c). Concentrations of other radionuclides (e.g., radium and thorium) were measured at back-ground levels and were eliminated from further consideration. Chemical contaminants identified in wells at the chemical plant area and ordnance works area include nitroaromatic compounds, metals, and inorganic anions. Trichloroethylene (TCE) and 1,2-dichloroethylene (1,2 -DCE) have been detected recently in a few wells near the raffinate pits at the chemical plant.

  9. Feasibility report for the installation and operation of an electrical power generating plant on the Islands of Zanzibar and Pemba, Tanzania. Export trade information

    SciTech Connect (OSTI)

    Patel, M.C.

    1994-04-04

    The study, conducted by S & Davis International, was funded by the U.S. Trade and Development Agency on behalf of Tanzania`s Ministry of Water, Construction, Energy, Land, and Environment. The report reviews and evaluates the existing power source and support stations for the current and future reliability of providing power to the islands of Zanzibar and Pemba as well as the feasibility of obtaining an independent power source. The study also covers the cost of power generation and rate structures, including the execution schedule and budgetary costs. The report contains the Introduction and Executive Summary and is divided into the following chapters: (1) General Information; (2) Power Supply Assessment; (3) Estimate of Power Usage; (4) Recommended Power Plant Configuration; (5) Technical Data on Generators; (6) The Economics.

  10. Integrating Safety Assessment Methods using the Risk Informed Safety Margins Characterization (RISMC) Approach

    SciTech Connect (OSTI)

    Curtis Smith; Diego Mandelli

    2013-03-01

    Safety is central to the design, licensing, operation, and economics of nuclear power plants (NPPs). As the current light water reactor (LWR) NPPs age beyond 60 years, there are possibilities for increased frequency of systems, structures, and components (SSC) degradations or failures that initiate safety significant events, reduce existing accident mitigation capabilities, or create new failure modes. Plant designers commonly “over-design” portions of NPPs and provide robustness in the form of redundant and diverse engineered safety features to ensure that, even in the case of well-beyond design basis scenarios, public health and safety will be protected with a very high degree of assurance. This form of defense-in-depth is a reasoned response to uncertainties and is often referred to generically as “safety margin.” Historically, specific safety margin provisions have been formulated primarily based on engineering judgment backed by a set of conservative engineering calculations. The ability to better characterize and quantify safety margin is important to improved decision making about LWR design, operation, and plant life extension. A systematic approach to characterization of safety margins and the subsequent margin management options represents a vital input to the licensee and regulatory analysis and decision making that will be involved. In addition, as research and development (R&D) in the LWR Sustainability (LWRS) Program and other collaborative efforts yield new data, sensors, and improved scientific understanding of physical processes that govern the aging and degradation of plant SSCs needs and opportunities to better optimize plant safety and performance will become known. To support decision making related to economics, readability, and safety, the RISMC Pathway provides methods and tools that enable mitigation options known as margins management strategies. The purpose of the RISMC Pathway R&D is to support plant decisions for risk-informed margin management with the aim to improve economics, reliability, and sustain safety of current NPPs. As the lead Department of Energy (DOE) Laboratory for this Pathway, the Idaho National Laboratory (INL) is tasked with developing and deploying methods and tools that support the quantification and management of safety margin and uncertainty.

  11. The Plant Variety Protection Act: Information for Texas Small Grain Producers 

    E-Print Network [OSTI]

    Brown, Steve; Morgan, Gaylon

    2005-01-26

    This publication explains the provision of the Plant Variety Protection Act and its amendments. It focuses on the PVPA's application to small grain producers....

  12. The use of information technology security assessment criteria to protect specialized computer systems

    SciTech Connect (OSTI)

    Lykov, V.A.; Shein, A.V.; Piskarev, A.S.; Devaney, D.M.; Melton, R.B.; Hunteman, W.J.; Prommel, J.M.; Rothfuss, J.S.

    1997-10-01

    The purpose of this paper is to discuss the information security assessment criteria used in Russia and compare it with that used in the United States. The computer system security assessment criteria utilized by the State Technical Commission of Russia and similar criteria utilized by the US Department of Defense (TCSEC) are intended for the development and implementation of proven methods for achieving a required level of information security. These criteria are utilized, first and foremost, when conducting certification assessments of general purpose systems. The Russian Federation is creating specialized systems for nuclear material control and accountancy (MC and A) within the framework of the international laboratory-to-laboratory collaboration. Depending on the conditions in which the MC and A system is intended to operate, some of the criteria and the attendant certification requirements may exceed those established or may overlap the requirements established for attestation of such systems. In this regard it is possible to modify the certification and attestation requirements depending on the conditions in which a system will operate in order to achieve the ultimate goal--implementation of the systems in the industry.

  13. Preliminary Feasibility Assessment of Integrating CCHP with NW Food Processing Plant #1: Modeling Documentation

    SciTech Connect (OSTI)

    Hoffman, Michael G.; Srivastava, Viraj; Wagner, Anne W.; Makhmalbaf, Atefe; Thornton, John

    2014-01-01

    The Pacific Northwest National Laboratory (PNNL) has launched a project funded by the Bonneville Power Association (BPA) to identify strategies for increasing industrial energy efficiency and reducing energy costs of Northwest Food Processors Association (NWFPA) plants through deployment of novel combinations and designs of variable-output combined heat and power (CHP) distributed generation (DG), combined cooling, heating and electric power (CCHP) DG and energy storage systems. Detailed evaluations and recommendations of CHP and CCHP DG systems will be performed for several Northwest (NW) food processing sites. The objective is to reduce the overall energy use intensity of NW food processors by 25% by 2020 and by 50% by 2030, as well as reducing emissions and understanding potential congestion reduction impacts on the transmission system in the Pacific Northwest.

  14. Review of Methods Related to Assessing Human Performance in Nuclear Power Plant Control Room Simulations

    SciTech Connect (OSTI)

    Katya L Le Blanc; Ronald L Boring; David I Gertman

    2001-11-01

    With the increased use of digital systems in Nuclear Power Plant (NPP) control rooms comes a need to thoroughly understand the human performance issues associated with digital systems. A common way to evaluate human performance is to test operators and crews in NPP control room simulators. However, it is often challenging to characterize human performance in meaningful ways when measuring performance in NPP control room simulations. A review of the literature in NPP simulator studies reveals a variety of ways to measure human performance in NPP control room simulations including direct observation, automated computer logging, recordings from physiological equipment, self-report techniques, protocol analysis and structured debriefs, and application of model-based evaluation. These methods and the particular measures used are summarized and evaluated.

  15. Material Aging and Degradation Detection and Remaining Life Assessment for Plant Life Management

    SciTech Connect (OSTI)

    Ramuhalli, Pradeep; Henager, Charles H.; Griffin, Jeffrey W.; Meyer, Ryan M.; Coble, Jamie B.; Pitman, Stan G.; Bond, Leonard J.

    2012-12-31

    One of the major factors that may impact long term operations is structural material degradation, Detecting materials degradation, estimating the remaining useful life (RUL) of the component, and determining approaches to mitigating the degradation are important from the perspective of long term operations. In this study, multiple nondestructive measurement and monitoring methods were evaluated for their ability to assess the material degradation state. Metrics quantifying the level of damage from these measurements were defined, and evaluated for their ability to provide estimates of remaining life of the component. An example of estimating the RUL from nondestructive measurements of material degradation condition is provided.

  16. How information resources are used by state agencies in risk assessment applications - Illinois

    SciTech Connect (OSTI)

    Olson, C.S.

    1990-12-31

    The Environmental Protection Agency of the State of Illinois (Illinois EPA) has programs in water, air, and land pollution and water supplies paralleling those of the US Environmental Protection Agency (EPA). The organization is part of a tripartite arrangement in which the Pollution Control Board is the judicial arm, the Department of Energy and Natural Resources is the research arm, and the Illinois EPA is the enforcement arm. Other state agencies are also concerned with various aspects of the environment and may do risk assessments for chemicals. Although there are various risk assessment activities, both formal and informal, in our agency and in others, this paper will discuss only recent initiatives in water quality criteria.

  17. Biological assessment for the remedial action at the chemical plant area of the Weldon Spring site

    SciTech Connect (OSTI)

    Hlohowskyj, I.; Dunn, C.P.

    1992-11-01

    The Weldon Spring site in St.Charles County, Missouri, became contaminated during the 1940s through the 1960s as a result of explosives production by the US Army and uranium and thorium processing by the predecessor agency of the US Department of Energy (DOE). The site is listed on the National Priorities List of the US Environmental Protection Agency, and DOE is responsible for its cleanup. Contaminants are present in soil, surface water, and aquatic sediments. Alternatives identified for site remediation are no action (included as baseline for comparison), treatment and disposal of the wastes at the Weldon Spring site, and on-site treatment followed by off-site disposal at either a commercial facility near Clive, Utah, or at DOE`s Hanford site near Richland, Washington. In accordance with the requirements of the Endangered Species Act, this biological assessment has been prepared to evaluate the potential effects of proposed remedial action alternatives on federal listed (endangered or threatened) and candidate species at the respective sites. The assessment includes consideration of the environmental setting at each site; the federal listed and candidate species that could occur at each site; the construction, excavation, and treatment activities under each alternative; and the amount of land area affected at each site.

  18. Biological assessment for the remedial action at the chemical plant area of the Weldon Spring site

    SciTech Connect (OSTI)

    Hlohowskyj, I.; Dunn, C.P.

    1992-11-01

    The Weldon Spring site in St.Charles County, Missouri, became contaminated during the 1940s through the 1960s as a result of explosives production by the US Army and uranium and thorium processing by the predecessor agency of the US Department of Energy (DOE). The site is listed on the National Priorities List of the US Environmental Protection Agency, and DOE is responsible for its cleanup. Contaminants are present in soil, surface water, and aquatic sediments. Alternatives identified for site remediation are no action (included as baseline for comparison), treatment and disposal of the wastes at the Weldon Spring site, and on-site treatment followed by off-site disposal at either a commercial facility near Clive, Utah, or at DOE's Hanford site near Richland, Washington. In accordance with the requirements of the Endangered Species Act, this biological assessment has been prepared to evaluate the potential effects of proposed remedial action alternatives on federal listed (endangered or threatened) and candidate species at the respective sites. The assessment includes consideration of the environmental setting at each site; the federal listed and candidate species that could occur at each site; the construction, excavation, and treatment activities under each alternative; and the amount of land area affected at each site.

  19. Approved Module Information for BHM347, 2014/5 Module Title/Name: Assessment Performance & Reward Module Code: BHM347

    E-Print Network [OSTI]

    Neirotti, Juan Pablo

    Approved Module Information for BHM347, 2014/5 Module Title/Name: Assessment Performance & Reward Module Code: BHM347 School: Aston Business School Module Type: Standard Module New Module? No Module Practitioners: Recruitment and Selection (including Selection Assessment) Performance Measurement Management

  20. Low/medium Btu coal gasification assessment of central plant for the city of Philadelphia, Pennsylvania. Final report

    SciTech Connect (OSTI)

    Not Available

    1981-02-01

    The objective of this study is to assess the technical and economic feasibility of producing, distributing, selling, and using fuel gas for industrial applications in Philadelphia. The primary driving force for the assessment is the fact that oil users are encountering rapidly escalating fuel costs, and are uncertain about the future availability of low sulfur fuel oil. The situation is also complicated by legislation aimed at reducing oil consumption and by difficulties in assuring a long term supply of natural gas. Early in the gasifier selection study it was decided that the level of risk associated with the gasification process sould be minimal. It was therefore determined that the process should be selected from those commercially proven. The following processes were considered: Lurgi, KT, Winkler, and Wellman-Galusha. From past experience and a knowledge of the characteristics of each gasifier, a list of advantages and disadvantages of each process was formulated. It was concluded that a medium Btu KT gas can be manufactured and distributed at a lower average price than the conservatively projected average price of No. 6 oil, provided that the plant is operated as a base load producer of gas. The methodology used is described, assumptions are detailed and recommendations are made. (LTN)

  1. Projecting changes in annual hydropower generation using regional runoff data: an assessment of the United States federal hydropower plants

    SciTech Connect (OSTI)

    Kao, Shih-Chieh; Sale, Michael J; Ashfaq, Moetasim; Uria Martinez, Rocio; Kaiser, Dale Patrick; Wei, Yaxing; Diffenbaugh, Noah

    2015-01-01

    Federal hydropower plants account for approximately half of installed US conventional hydropower capacity, and are an important part of the national renewable energy portfolio. Utilizing the strong linear relationship between the US Geological Survey WaterWatch runoff and annual hydropower generation, a runoff-based assessment approach is introduced in this study to project changes in annual and regional hydropower generation in multiple power marketing areas. Future climate scenarios are developed with a series of global and regional climate models, and the model output is bias-corrected to be consistent with observed data for the recent past. Using this approach, the median decrease in annual generation at federal projects is projected to be less than 2 TWh, with an estimated ensemble uncertainty of 9 TWh. Although these estimates are similar to the recently observed variability in annual hydropower generation, and may therefore appear to be manageable, significantly seasonal runoff changes are projected and it may pose significant challenges in water systems with higher limits on reservoir storage and operational flexibility. Future assessments will be improved by incorporating next-generation climate models, by closer examination of extreme events and longer-term change, and by addressing the interactions among hydropower and other water uses.

  2. JV Task 122 - Assessment of Mercury Control Options for the San Miguel Electric Cooperative Power Plant

    SciTech Connect (OSTI)

    Nicholas Lentz; Brandon Pavlish; John Kay; Michael Jones

    2009-02-01

    In the United States, testing has been under way at electric coal-fired power plants to find viable and economical mercury control strategies to meet pending regulations. San Miguel Electric Cooperative (SMEC) engaged the Energy & Environmental Research Center (EERC) through a request for proposal (RFP) to perform research tests to evaluate sorbent-based technologies at its coal-fired San Miguel Generating Station to identify possible technology options that could be used by SMEC to meet the mercury reduction requirements of future U.S. federal standards. The goal of the testing was to target a mercury removal of {ge}90%. The EERC has successfully field-tested several sorbent-based technologies in previous projects that offer promise and potential to achieve a target removal of {ge}90%. Based on these field test results, yet recognizing that fuel type and plant operating conditions affect mercury capture significantly, the EERC proposed research tests to evaluate potential sorbent-based technologies provided by Norit Americas and the EERC that could potentially meet SMEC's mercury control objectives. Over the period of May through mid-June 2008, the EERC tested injection of both treated and nontreated activated carbon (AC) provided by Norit Americas and sorbent enhancement additives (SEAs) provided by the EERC. Tests were performed at San Miguel Unit 1 (450 MW) and included injection at the inlet of the air heater (AH) (temperature of 720 F). The test coal was a Texas lignite fuel with an average moisture content of 31.19%, an ash content of 26.6%, a heating value of 5,094 Btu/lb, a sulfur content of 2.7%, and a mercury concentration of 0.182 ppm, all reported on an as-received basis. Pilot-scale testing results identified DARCO{reg_sign} Hg-LH, SEA2 + DARCO{reg_sign} Hg, and the ChemMod sorbents as technologies with the potential to achieve the target mercury removal of {ge}90% at the full-scale test. Mercury concentrations were tracked with continuous mercury monitors (CMMs) at the electrostatic precipitator (ESP) inlet (ESP In), scrubber inlet, and scrubber outlet of San Miguel Unit 1, and a dry sorbent trap method was used to take samples periodically to measure mercury concentrations at the each of the CMM sampling locations described above. A limited number of Ontario Hydro (OH) measurements were also conducted. Removal efficiencies were calculated from mercury-in-coal values to scrubber out CMM values. Sorbent trap samples taken at the each sampling location outlet were found to be fairly consistent with CMM values. A maximum mercury removal of 78.5% was achieved with the SEA2 + DARCO Hg sorbent combination at injection rates of 50 ppm and 4 lb/Macf, respectively. An injection rate of 4 lb/Macf for DARCO Hg-LH and DARCO Hg resulted in mercury removals of 70.0% and 64.2%, respectively. These mercury reduction values were achieved at full load and at stable plant operating conditions. Scrubber reemission was observed during sorbent injection and had a significant effect on coal to scrubber out mercury removal values. When the sorbents were injected into San Miguel Unit 1 at the AH inlet, no effects on unit operations were observed. ESP performance throughout the test period was fairly steady, with only one minor breakdown. However, it should be noted that test durations were short.

  3. Information integration for environmental monitoring and assessment: An annotated bibliography. Professional paper

    SciTech Connect (OSTI)

    Rajagopal, R.; Natarajan, U.; Wacker, J.

    1992-01-01

    Annual federal and state investments in the collection, storage, and maintenance of resource and environmental data are enormous (estimated in the range of a few to tens of billions of dollars). Despite these investments, the use of information from these databases for societal endpoints has been limited. Further research to evaluate the utility of large environmental databases in the analysis of selected scientific and regulatory questions therefore would be timely. The primary purpose of the paper is to provide an annotated review of selected literature on the topic of information integration in the context of environmental monitoring and assessment. Based on a review of this literature, significant scholarly contributions to this field have been identified as falling into the following four issue areas: institutional, resource/ecological, design, and technological. The publications are grouped, indexed, associated with keywords and organized under these four major issue areas.

  4. Iodine Pathways and Off-Gas Stream Characteristics for Aqueous Reprocessing Plants – A Literature Survey and Assessment

    SciTech Connect (OSTI)

    R. T. Jubin; D. M. Strachan; N. R. Soelberg

    2013-09-01

    Used nuclear fuel is currently being reprocessed in only a few countries, notably France, England, Japan, and Russia. The need to control emissions of the gaseous radionuclides to the air during nuclear fuel reprocessing has already been reported for the entire plant. But since the gaseous radionuclides can partition to various different reprocessing off-gas streams, for example, from the head end, dissolver, vessel, cell, and melter, an understanding of each of these streams is critical. These off-gas streams have different flow rates and compositions and could have different gaseous radionuclide control requirements, depending on how the gaseous radionuclides partition. This report reviews the available literature to summarize specific engineering data on the flow rates, forms of the volatile radionuclides in off-gas streams, distributions of these radionuclides in these streams, and temperatures of these streams. This document contains an extensive bibliography of the information contained in the open literature.

  5. Preliminary performance assessment for the Waste Isolation Pilot Plant, December 1992. Volume 5, Uncertainty and sensitivity analyses of gas and brine migration for undisturbed performance

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    Before disposing of transuranic radioactive waste in the Waste Isolation Pilot Plant (WIPP), the United States Department of Energy (DOE) must evaluate compliance with applicable long-term regulations of the United States Environmental Protection Agency (EPA). Sandia National Laboratories is conducting iterative performance assessments (PAs) of the WIPP for the DOE to provide interim guidance while preparing for a final compliance evaluation. This volume of the 1992 PA contains results of uncertainty and sensitivity analyses with respect to migration of gas and brine from the undisturbed repository. Additional information about the 1992 PA is provided in other volumes. Volume 1 contains an overview of WIPP PA and results of a preliminary comparison with 40 CFR 191, Subpart B. Volume 2 describes the technical basis for the performance assessment, including descriptions of the linked computational models used in the Monte Carlo analyses. Volume 3 contains the reference data base and values for input parameters used in consequence and probability modeling. Volume 4 contains uncertainty and sensitivity analyses with respect to the EPA`s Environmental Standards for the Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes (40 CFR 191, Subpart B). Finally, guidance derived from the entire 1992 PA is presented in Volume 6. Results of the 1992 uncertainty and sensitivity analyses indicate that, conditional on the modeling assumptions and the assigned parameter-value distributions, the most important parameters for which uncertainty has the potential to affect gas and brine migration from the undisturbed repository are: initial liquid saturation in the waste, anhydrite permeability, biodegradation-reaction stoichiometry, gas-generation rates for both corrosion and biodegradation under inundated conditions, and the permeability of the long-term shaft seal.

  6. Portsmouth Needs Assessment

    Office of Energy Efficiency and Renewable Energy (EERE)

    Needs Assessment for former Oak Ridge K-25, Paducah, and Portsmouth Gaseous Diffusion Plant production workers.

  7. Paducah Needs Assessment

    Office of Energy Efficiency and Renewable Energy (EERE)

    Needs Assessment for former Oak Ridge K-25, Paducah, and Portsmouth Gaseous Diffusion Plant production workers.

  8. A Resilient Condition Assessment Monitoring System

    SciTech Connect (OSTI)

    Humberto Garcia; Wen-Chiao Lin; Semyon M. Meerkov

    2012-08-01

    An architecture and supporting methods are presented for the implementation of a resilient condition assessment monitoring system that can adaptively accommodate both cyber and physical anomalies to a monitored system under observation. In particular, the architecture includes three layers: information, assessment, and sensor selection. The information layer estimates probability distributions of process variables based on sensor measurements and assessments of the quality of sensor data. Based on these estimates, the assessment layer then employs probabilistic reasoning methods to assess the plant health. The sensor selection layer selects sensors so that assessments of the plant condition can be made within desired time periods. Resilient features of the developed system are then illustrated by simulations of a simplified power plant model, where a large portion of the sensors are under attack.

  9. An introduction to the mechanics of performance assessment using examples of calculations done for the Waste Isolation Pilot Plant between 1990 and 1992. Revision

    SciTech Connect (OSTI)

    Rechard, R.P.

    1996-06-01

    This document provides an overview of the processes used to access the performance of the Waste Isolation Pilot Plant (WIPP). The quantitative metrics used in the performance-assessment (PA) process are those put forward in the Environmental Protection Agency`s Environmental Standards for the Management and Disposal of Spent Nuclear Fuel, HIgh-LEvel and transuranic radioactive Wastes (40 CFR 191).

  10. Ecological Risk Assessments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ecological Risk Assessments Ecological Risk Assessments Ecological risk assessment is the appraisal of potential adverse effects of exposure to contaminants on plants and animals....

  11. A quantitative method to analyze the quality of EIA information in wind energy development and avian/bat assessments

    SciTech Connect (OSTI)

    Chang, Tony, E-mail: tc282@nau.edu [Environmental Science and Policy Program, School of Earth Science and Environmental Sustainability, Northern Arizona University, 602 S Humphreys P.O. Box 5694, Flagstaff, AZ, 86011 (United States); Nielsen, Erik, E-mail: erik.nielsen@nau.edu [Environmental Science and Policy Program, School of Earth Science and Environmental Sustainability, Northern Arizona University, 602 S Humphreys P.O. Box 5694, Flagstaff, AZ, 86011 (United States); Auberle, William, E-mail: william.auberle@nau.edu [Civil and Environmental Engineering Program, Department of Civil and Environmental Engineering, Northern Arizona University, 2112 S Huffer Ln P.O. Box 15600, Flagstaff, AZ, 860011 (United States); Solop, Frederic I., E-mail: fred.solop@nau.edu [Political Science Program, Department of Politics and International Affairs, Northern Arizona University, P.O. Box 15036, Flagstaff, AZ 86001 (United States)

    2013-01-15

    The environmental impact assessment (EIA) has been a tool for decision makers since the enactment of the National Environmental Policy Act (NEPA). Since that time, few analyses have been performed to verify the quality of information and content within EIAs. High quality information within assessments is vital in order for decision makers, stake holders, and the public to understand the potential impact of proposed actions on the ecosystem and wildlife species. Low quality information has been a major cause for litigation and economic loss. Since 1999, wind energy development has seen an exponential growth with unknown levels of impact on wildlife species, in particular bird and bat species. The purpose of this article is to: (1) develop, validate, and apply a quantitative index to review avian/bat assessment quality for wind energy EIAs; and (2) assess the trends and status of avian/bat assessment quality in a sample of wind energy EIAs. This research presents the development and testing of the Avian and Bat Assessment Quality Index (ABAQI), a new approach to quantify information quality of ecological assessments within wind energy development EIAs in relation to avian and bat species based on review areas and factors derived from 23 state wind/wildlife siting guidance documents. The ABAQI was tested through a review of 49 publicly available EIA documents and validated by identifying high variation in avian and bat assessments quality for wind energy developments. Of all the reviewed EIAs, 66% failed to provide high levels of preconstruction avian and bat survey information, compared to recommended factors from state guidelines. This suggests the need for greater consistency from recommended guidelines by state, and mandatory compliance by EIA preparers to avoid possible habitat and species loss, wind energy development shut down, and future lawsuits. - Highlights: Black-Right-Pointing-Pointer We developed, validated, and applied a quantitative index to review avian/bat assessment quality for wind energy EIAs. Black-Right-Pointing-Pointer We assessed the trends and status of avian/bat assessment quality in a sample of wind energy EIAs. Black-Right-Pointing-Pointer Applied index to 49 EIA documents and identified high variation in assessment quality for wind energy developments. Black-Right-Pointing-Pointer For the reviewed EIAs, 66% provided inadequate preconstruction avian and bat survey information.

  12. Nuclear power plant cable materials : review of qualification and currently available aging data for margin assessments in cable performance.

    SciTech Connect (OSTI)

    Celina, Mathias Christopher; Gillen, Kenneth Todd; Lindgren, Eric Richard

    2013-05-01

    A selective literature review was conducted to assess whether currently available accelerated aging and original qualification data could be used to establish operational margins for the continued use of cable insulation and jacketing materials in nuclear power plant environments. The materials are subject to chemical and physical degradation under extended radiationthermal- oxidative conditions. Of particular interest were the circumstances under which existing aging data could be used to predict whether aged materials should pass loss of coolant accident (LOCA) performance requirements. Original LOCA qualification testing usually involved accelerated aging simulations of the 40-year expected ambient aging conditions followed by a LOCA simulation. The accelerated aging simulations were conducted under rapid accelerated aging conditions that did not account for many of the known limitations in accelerated polymer aging and therefore did not correctly simulate actual aging conditions. These highly accelerated aging conditions resulted in insulation materials with mostlyinert' aging processes as well as jacket materials where oxidative damage dropped quickly away from the air-exposed outside jacket surface. Therefore, for most LOCA performance predictions, testing appears to have relied upon heterogeneous aging behavior with oxidation often limited to the exterior of the cable cross-section - a situation which is not comparable with the nearly homogenous oxidative aging that will occur over decades under low dose rate and low temperature plant conditions. The historical aging conditions are therefore insufficient to determine with reasonable confidence the remaining operational margins for these materials. This does not necessarily imply that the existing 40-year-old materials would fail if LOCA conditions occurred, but rather that unambiguous statements about the current aging state and anticipated LOCA performance cannot be provided based on original qualification testing data alone. The non-availability of conclusive predictions for the aging conditions of 40-year-old cables implies that the same levels of uncertainty will remain for any re-qualification or extended operation of these cables. The highly variable aging behavior of the range of materials employed also implies that simple, standardized aging tests are not sufficient to provide the required aging data and performance predictions for all materials. It is recommended that focused studies be conducted that would yield the material aging parameters needed to predict aging behaviors under low dose, low temperature plant equivalent conditions and that appropriately aged specimens be prepared that would mimic oxidatively-aged 40- to 60- year-old materials for confirmatory LOCA performance testing. This study concludes that it is not sufficient to expose materials to rapid, high radiation and high temperature levels with subsequent LOCA qualification testing in order to predictively quantify safety margins of existing infrastructure with regard to LOCA performance. We need to better understand how cable jacketing and insulation materials have degraded over decades of power plant operation and how this aging history relates to service life prediction and the performance of existing equipment to withstand a LOCA situation.

  13. Petroleum Resource Management and Assessment project for the Western Siberian Administration Russia. TDA feasibility study. Export trade information

    SciTech Connect (OSTI)

    Not Available

    1993-01-01

    The objective of the study is: (1) To determine the nature and availability of the information necessary for Resource Assessment in oil fields to be open to foreign investment; (2) To determine what resources are required to implement the 'Alberta Model' of Resource Management in Siberia; (3) To establish a pilot Data Collection and Information System, including software, hardware and technology; (4) To indicate whether the studied database model and related software can meet Russia's long term requirements for information management in the petroleum sector; (5) The transfer of information techniques to the Russian implementation teams; and (6) To define the requirements for a resource/economic study.

  14. Y. Yiliyasi and D. Berleant, "World oil reserves data: information quality assessment and analysis," 16th International Conference on Information Quality, Nov. 18-20, 2011, Adelaide, Australia

    E-Print Network [OSTI]

    Berleant, Daniel

    have important implications due to the heavy reliance of modern economy on petroleum. Bad data can and governments or are not freely available. In some cases, oil reserve figures are exaggerated for economicY. Yiliyasi and D. Berleant, "World oil reserves data: information quality assessment and analysis

  15. Integrated Information Technology Framework for Analysis of Data from Enrichment Plants to Support the Safeguards Mission

    SciTech Connect (OSTI)

    Marr, Clifton T.; Thurman, David A.; Jorgensen, Bruce V.

    2008-07-15

    ABSTRACT Many examples of software architectures exist that support process monitoring and analysis applications which could be applied to enrichment plants in a fashion that supports the Safeguards Mission. Pacific Northwest National Laboratory (PNNL) has developed mature solutions that will provide the framework to support online statistical analysis of enrichment plans and the entire nuclear fuel cycle. Most recently, PNNL has developed a refined architecture and supporting tools that address many of the common problems analysis and modeling environments experience: pipelining, handling large data volumes, and real-time performance. We propose the architecture and tools may be successfully used in furthering the goals of nuclear material control and accountability as both an aid to processing plant owners and as comprehensive monitoring for oversight teams.

  16. File:07CADCPCNForSmallPowerPlantExemption.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf JumpAKAPowerPlantSitingConstruction.pdf

  17. File:07UTAPowerPlantSitingProcess.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermitORDExpeditedPlantCommissioningProcess.pdf Jump to:

  18. Preliminary performance assessment for the Waste Isolation Pilot Plant, December 1992. Volume 1, Third comparison with 40 CFR 191, Subpart B

    SciTech Connect (OSTI)

    Not Available

    1992-12-01

    Before disposing of transuranic radioactive wastes in the Waste Isolation Pilot Plant (WIPP), the United States Department of Energy (DOE) must evaluate compliance with applicable long-term regulations of the United States Environmental Protection Agency (EPA). Sandia National Laboratories is conducting iterative performance assessments of the WIPP for the DOE to provide interim guidance while preparing for final compliance evaluations. This volume contains an overview of WIPP performance assessment and a preliminary comparison with the long-term requirements of the Environmental Radiation Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes (40 CFR 191, Subpart B).

  19. Resources for global risk assessment: The International Toxicity Estimates for Risk (ITER) and Risk Information Exchange (RiskIE) databases

    SciTech Connect (OSTI)

    Wullenweber, Andrea Kroner, Oliver; Kohrman, Melissa; Maier, Andrew; Dourson, Michael; Rak, Andrew; Wexler, Philip; Tomljanovic, Chuck

    2008-11-15

    The rate of chemical synthesis and use has outpaced the development of risk values and the resolution of risk assessment methodology questions. In addition, available risk values derived by different organizations may vary due to scientific judgments, mission of the organization, or use of more recently published data. Further, each organization derives values for a unique chemical list so it can be challenging to locate data on a given chemical. Two Internet resources are available to address these issues. First, the International Toxicity Estimates for Risk (ITER) database ( (www.tera.org/iter)) provides chronic human health risk assessment data from a variety of organizations worldwide in a side-by-side format, explains differences in risk values derived by different organizations, and links directly to each organization's website for more detailed information. It is also the only database that includes risk information from independent parties whose risk values have undergone independent peer review. Second, the Risk Information Exchange (RiskIE) is a database of in progress chemical risk assessment work, and includes non-chemical information related to human health risk assessment, such as training modules, white papers and risk documents. RiskIE is available at (http://www.allianceforrisk.org/RiskIE.htm), and will join ITER on National Library of Medicine's TOXNET ( (http://toxnet.nlm.nih.gov/)). Together, ITER and RiskIE provide risk assessors essential tools for easily identifying and comparing available risk data, for sharing in progress assessments, and for enhancing interaction among risk assessment groups to decrease duplication of effort and to harmonize risk assessment procedures across organizations.

  20. A TECHNICAL ASSESSMENT OF THE CURRENT WATER POLICY BOUNDARY AT U.S. DEPARTMENT OF ENERGY, PADUCAH GASEOUS DIFFUSION PLANT, PADUCAH, KENTUCKY

    SciTech Connect (OSTI)

    2012-12-13

    In 1988, groundwater contaminated with trichloroethene (TCE) and technetium-99 (Tc-99) was identified in samples collected from residential water wells withdrawing groundwater from the Regional Gravel Aquifer (RGA) north of the Paducah Gaseous Diffusion Plant (PGDP) facility. In response, the U.S. Department of Energy (DOE) provided temporary drinking water supplies to approximately 100 potentially affected residents by initially supplying bottled water, water tanks, and water-treatment systems, and then by extending municipal water lines, all at no cost, to those persons whose wells could be affected by contaminated groundwater. The Water Policy boundary was established in 1993. In the Policy, DOE agreed to pay the reasonable monthly cost of water for homes and businesses and, in exchange, many of the land owners signed license agreements committing to cease using the groundwater via rural water wells. In 2012, DOE requested that Oak Ridge Associated Universities (ORAU), managing contractor of Oak Ridge Institute for Science and Education (ORISE), provide an independent assessment of the quality and quantity of the existing groundwater monitoring data and determine if there is sufficient information to support a modification to the boundary of the current Water Policy. As a result of the assessment, ORAU concludes that sufficient groundwater monitoring data exists to determine that a shrinkage and/or shift of the plume(s) responsible for the initial development of this policy has occurred. Specifically, there is compelling evidence that the TCE plume is undergoing shrinkage due to natural attenuation and associated degradation. The plume shrinkage (and migration) has also been augmented in local areas where large volumes of groundwater were recovered by pump-and treat remedial systems along the eastern and western boundaries of the Northwest Plume, and in other areas where pump-and-treat systems have been deployed by DOE to remove source contaminants. The available evidence supports adjusting the western and northwestern Water Policy boundary. Based on the historical and modeled hydrogeological data reflecting past flow and plume attenuation, along with associated plume migration toward the northeast, the establishment of a new boundary along the westernmost margin of the earliest indication of the TCE plume is proposed and justified on hydrogeological grounds. Approximately 30% of the original area would remain within the adjusted Water Policy area west and northwest of the PGDP facility. This modification would release about 70% of the area, although individual properties would overlap the new boundary.

  1. Evaluation of beryllium exposure assessment and control programs at AWE, Cardiff Facility, Rocky Flats Plant, Oak Ridge Y-12 Plant and Lawrence Livermore National Laboratory. Phase 1

    SciTech Connect (OSTI)

    Johnson, J.S.; Foote, K.L.; Slawski, J.W.; Cogbill, G.

    1995-04-28

    Site visits were made to DOE beryllium handling facilities at the Rocky Flats Plant; Oak Ridge Y-12 Plant, LLNL; as well as to the AWE Cardiff Facility. Available historical data from each facility describing its beryllium control program were obtained and summarized in this report. The AWE Cardiff Facility computerized Be personal and area air-sampling database was obtained and a preliminary evaluation was conducted. Further validation and documentation of this database will be very useful in estimating worker Be. exposure as well as in identifying the source potential for a variety of Be fabrication activities. Although all of the Be control programs recognized the toxicity of Be and its compounds, their established control procedures differed significantly. The Cardiff Facility, which was designed for only Be work, implemented a very strict Be control program that has essentially remained unchanged, even to today. LLNL and the Oak Ridge Y-12 Plant also implemented a strict Be control program, but personal sampling was not used until the mid 1980s to evaluate worker exposure. The Rocky Flats plant implemented significantly less controls on beryllium processing than the three previous facilities. In addition, records were less available, management and industrial hygiene staff turned over regularly, and less control was evident from a management perspective.

  2. Wastewater Land Application Permit LA-000141 Renewal Information for the Central Facilities Area Sewage Treatment Plant

    SciTech Connect (OSTI)

    none,

    1999-02-01

    On July 25, 1994, the State of ldaho Division of Environmental Quality issued a Wastewater Land Application Permit, #LA-000141-01, for the Central Facilities Area Sewage Treatment Plant. The permit expires August 7, 1999. This report is being submitted with the renewal application and specifically addresses; Wastewater flow; Wastewater characteristics; Impacts to vegetation in irrigation area; Impacts to soil in irrigation area; Evaluation of groundwater monitoring wells for Wastewater Land Application Permit purposes; Summary of trends observed during the 5-year reporting period; and Projection of changes and new processes.

  3. File:07AKAPowerPlantSitingConstruction.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf JumpAKAPowerPlantSitingConstruction.pdf Jump to: navigation, search

  4. File:07ORDExpeditedPlantCommissioningProcess.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermitORDExpeditedPlantCommissioningProcess.pdf Jump to: navigation, search File File

  5. File:07ORAStatePlantConstruction (1).pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdfInformationInformation7MTAEnergyFacilitySiting

  6. Technology Assessment TECHNOLOGY ASSESSMENT

    E-Print Network [OSTI]

    Rock, Chris

    Technology Assessment 10/14/2004 1 TECHNOLOGY ASSESSMENT STRATEGIC PLAN MISSION STATEMENT Support the Mission of Texas Tech University and the TTU Information Technology Division by providing timely and relevant information and assistance in current and emerging technologies and their practical applications

  7. An assessment of plant biointrusion at the Uranium Mill Tailings Remedial Action Project rock-covered disposal cells

    SciTech Connect (OSTI)

    Not Available

    1990-10-01

    This study is one of a number of special studies that have been conducted regarding various aspects of the Uranium Mill Tailings Remedial Action (UMTRA) Project. This special study was proposed following routine surveillance and maintenance surveys and observations reported in a special study of vegetative covers (DOE, 1988), in which plants were observed growing up through the rock erosion layer at recently completed disposal cells. Some of the plants observed were deep-rooted woody species, and questions concerning root intrusion into disposal cells and the need to control plant growth were raised. The special study discussed in this report was designed to address some of the ramifications of plant growth on disposal cells that have rock covers. The NRC has chosen rock covers over vegetative covers in the arid western United States because licenses cannot substantiate that the vegetative covers will be significantly greater than 30 percent and preferably 70 percent,'' which is the amount of vegetation required to reduce flow to a point of stability.'' The potential impacts of vegetation growing in rock covers are not addressed by the NRC (1990). The objectives, then, of this study were to determine the species of plants growing on two rock-covered disposal cells, study the rooting pattern of plants on these cells, and identify possible impacts of plant root penetration on these and other UMTRA Project rock-covered cells.

  8. File:07IDAPowerPlantSitingConstruction.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdfInformation

  9. Performance assessments at ETH Zrich: Information for lecturers and students of the Bachelor and Master programmes Environmental Sciences (D-USYS); Translated from the German original

    E-Print Network [OSTI]

    Fischlin, Andreas

    of Environmental Sciences Peter Frischknecht #12;Performance assessments at ETH Zürich: Information for lecturersPerformance assessments at ETH Zürich: Information for lecturers and students of the Bachelor and Master programmes Environmental Sciences (D-USYS); Translated from the German original

  10. Plant Design and Cost Assessment of Forced Circulation Lead-Bismuth Cooled Reactor with Conventional Power Conversion Cycles

    E-Print Network [OSTI]

    Dostal, Vaclav

    Cost of electricity is the key factor that determines competitiveness of a power plant. Thus the proper selection, design and optimization of the electric power generating cycle is of main importance. This report makes an ...

  11. A Comparison of Demand Side Management Data Assessment Procedures for Small and Medium-Sized Manufacturing Plants 

    E-Print Network [OSTI]

    Matheidas, M. T.; Heffington, W. M.

    1995-01-01

    Two methods of obtaining demand reduction data from industrial energy audits are compared. One very simple method calculates demand savings by dividing energy savings in kilowatt hours by the operating hours of the plant. Problems (some obvious...

  12. Guidelines for nuclear power plant safety issue prioritization information development. Supplement 5

    SciTech Connect (OSTI)

    Daling, P.M.; Lavender, J.C.

    1996-07-01

    This is the sixth in a series of reports to document the development and use of a methodology developed by the Pacific Northwest Laboratory (PNL) to calculate, for prioritization purposes, the risk, dose, and cost impacts of implementing potential resolutions to reactor safety issues (see NUREG/CR-2800, Andrews, et al., 1983). This report contains the results of issue-specific analyses for 34 generic issues. Each issue was considered within the constraints of available information at the time the issues were examined and approximately 2 staff-weeks of labor. The results are referenced as one consideration in NUREG-0933, A Prioritization of Generic Safety Issues (Emrit, et al., 1983).

  13. ENZYME ACTIVITY PROBE AND GEOCHEMICAL ASSESSMENT FOR POTENTIAL AEROBIC COMETABOLISM OF TRICHLOROETHENE IN GROUNDWATER OF THE NORTHWEST PLUME, PADUCAH GASEOUS DIFFUSION PLANT, KENTUCKY

    SciTech Connect (OSTI)

    Looney, B; M. Hope Lee, M; S. K. Hampson, S

    2008-06-27

    The overarching objective of the Paducah Gaseous Diffusion Plant (PGDP) enzyme activity probe (EAP) effort is to determine if aerobic cometabolism is contributing to the attenuation of trichloroethene (TCE) and other chlorinated solvents in the contaminated groundwater beneath PGDP. The site-specific objective for the EAP assessment is to identify if key metabolic pathways are present and expressed in the microbial community--namely the pathways that are responsible for degradation of methane and aromatic (e.g. toluene, benzene, phenol) substrates. The enzymes produced to degrade methane and aromatic compounds also break down TCE through a process known as cometabolism. EAPs directly measure if methane and/or aromatic enzyme production pathways are operating and, for the aromatic pathways, provide an estimate of the number of active organisms in the sampled groundwater. This study in the groundwater plumes at PGDP is a major part of a larger scientific effort being conducted by Interstate Technology and Regulatory Council (ITRC), U.S. Department of Energy (DOE) Office of Environmental Management (EM), Savannah River National Laboratory (SRNL), and North Wind Inc. in which EAPs are being applied to contaminated groundwater from diverse hydrogeologic and plume settings throughout the U.S. to help standardize their application as well as their interpretation. While EAP data provide key information to support the site specific objective for PGDP, several additional lines of evidence are being evaluated to increase confidence in the determination of the occurrence of biodegradation and the rate and sustainability of aerobic cometabolism. These complementary efforts include: (1) Examination of plume flowpaths and comparison of TCE behavior to 'conservative' tracers in the plume (e.g., {sup 99}Tc); (2) Evaluation of geochemical conditions throughout the plume; and (3) Evaluation of stable isotopes in the contaminants and their daughter products throughout the plume. If the multiple lines of evidence support the occurrence of cometabolism and the potential for the process to contribute to temporal and spatial attenuation of TCE in PGDP groundwater, then a follow-up enzyme probe microcosm study to better estimate biological degradation rate(s) is warranted.

  14. Sei Vojany Station repowering reconstruction assessment feasibility study. Volume 3. Export trade information

    SciTech Connect (OSTI)

    Not Available

    1992-01-01

    The feasibility study conducted for Slovensky Energeticky Podnik(Slovak Energy Production Company) (SEP) evaluates reconstruction, repowering, and expansion of SEP's Vojany Station(EVO). The study recommends a training program for government and plant officials.

  15. Tsunami Information Sources: Part 3

    E-Print Network [OSTI]

    Wiegel, Robert L.

    2006-01-01

    Tsunami Assessment Method for Nuclear Power Plants in Japan,Tsunami Assessment Method for Nuclear Power Plants in Japan,Tsunami Assessment Method for Nuclear Power Plants in Japan,

  16. A research needs assessment for the capture, utilization and disposal of carbon dioxide from fossil fuel-fired power plants. Volume 2, Topical reports: Final report

    SciTech Connect (OSTI)

    Not Available

    1993-07-01

    This study, identifies and assesses system approaches in order to prioritize research needs for the capture and non-atmospheric sequestering of a significant portion of the carbon dioxide (CO{sub 2}) emitted from fossil fuel-fired electric power plants (US power plants presently produce about 7% of the world`s CO{sub 2} emissions). The study considers capture technologies applicable either to existing plants or to those that optimistically might be demonstrated on a commercial scale over the next twenty years. The research needs that have high priority in establishing the technical, environmental, and economic feasibility of large-scale capture and disposal of CO{sub 2} from electric power plants are:(1) survey and assess the capacity, cost, and location of potential depleted gas and oil wells that are suitable CO{sub 2} repositories (with the cooperation of the oil and gas industry); (2) conduct research on the feasibility of ocean disposal, with objectives of determining the cost, residence time, and environmental effects for different methods of CO{sub 2} injection; (3) perform an in-depth survey of knowledge concerning the feasibility of using deep, confined aquifers for disposal and, if feasible, identify potential disposal locations (with the cooperation of the oil and gas industry); (4) evaluate, on a common basis, system and design alternatives for integration of CO{sub 2} capture systems with emerging and advanced technologies for power generation; and prepare a conceptual design, an analysis of barrier issues, and a preliminary cost estimate for pipeline networks necessary to transport a significant portion of the CO{sub 2} to potentially feasible disposal locations.

  17. Risk Assessment in Support of DOE Nuclear Safety, Risk Information Notice, June 2010

    Broader source: Energy.gov [DOE]

    On August 12, 2009, the Defense Nuclear Facilities Safety Board(DNFSB) issued Recommendation 2009?1, Risk Assessment Methodologies at Defense Nuclear Facilities. Thisrecommendation focused on the...

  18. An introduction to the mechanics of performance assessment using examples of calculations done for the Waste Isolation Pilot Plant between 1990 and 1992

    SciTech Connect (OSTI)

    Rechard, R.P.

    1995-10-01

    This document provides an overview of the process used to assess the performance of the Waste Isolation Pilot Plant (WIPP), a proposed repository for transuranic wastes that is located in southeastern New Mexico. The quantitative metrics used in the performance-assessment (PA) process are those put forward in the Environmental Protection Agency`s Environmental Standards for the Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive flasks (40 CFR 191). Much has been written about the individual building blocks that comprise the foundation of PA theory and practice, and that WIPP literature is well cited herein. However, the present approach is to provide an accurate, well documented overview of the process, from the perspective of the mechanical steps used to perform the actual PA calculations. Specifically, the preliminary stochastic simulations that comprise the WIPP PAs of 1990, 1991. and 1992 are summarized.

  19. Information resources used in health risk assessment by the New Jersey Department of Environmental Protection

    SciTech Connect (OSTI)

    Post, G.B.; Baratta, M.; Wolfson, S.; McGeorge, L.

    1990-12-31

    The New Jersey Department of Environmental Protection`s responsibilities related to health-based risk assessment are described, including its research projects and its development of health based compound specific standards and guidance levels. The resources used by the agency to support health risk assessment work are outlined.

  20. PLANT DISEASES IN SOUTH CAROLINA

    E-Print Network [OSTI]

    Stuart, Steven J.

    INDEX OF PLANT DISEASES IN SOUTH CAROLINA James H. Blake, Ed.D. Director, Home & Garden Information to compile a list of plant diseases occurring on cultivated and native plants in South Carolina. The data or conclusive list of the diseases of plants in South Carolina. New plants as well as new plant pathogens

  1. Independent Oversight Assessment, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    Waste Treatment and Immobilization Plant - January 2012 Independent Oversight Assessment, Waste Treatment and Immobilization Plant - January 2012 January 2012 Assessment of the...

  2. Report on the remedial investigation of Bear Creek Valley at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 6: Appendix G -- Baseline ecological risk assessment report

    SciTech Connect (OSTI)

    1996-09-01

    This Remedial Investigation (RI) Report characterizes the nature and extent of contamination, evaluates the fate and transport of contaminants, and assesses risk to human health and the environment resulting from waste disposal and other US Department of Energy (DOE) operations in Bear Creek Valley (BCV). BCV, which is located within the DOE Oak Ridge Reservation (ORR) encompasses multiple waste units containing hazardous and radioactive wastes arising from operations at the adjacent Oak Ridge Y-12 Plant. The primary waste units discussed in this RI Report are the S-3 Site, Oil Landfarm (OLF), Boneyard/Burnyard (BYBY), Sanitary Landfill 1 (SL 1), and Bear Creek Burial Grounds (BCBG). These waste units, plus the contaminated media resulting from environmental transport of the wastes from these units, are the subject of this RI. This BCV RI Report represents the first major step in the decision-making process for the BCV watershed. The RI results, in concert with the follow-on FS will form the basis for the Proposed Plan and Record of Decision for all BCV sites. This comprehensive decision document process will meet the objectives of the watershed approach for BCV. Appendix G contains ecological risks for fish, benthic invertebrates, soil invertebrates, plants, small mammals, deer, and predator/scavengers (hawks and fox). This risk assessment identified significant ecological risks from chemicals in water, sediment, soil, and shallow ground water. Metals and PCBs are the primary contaminants of concern.

  3. Early Site Permit Demonstration Program: Plant parameters envelope report. Volume 1

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    The Early Site Permit (ESP) Demonstration Program is the nuclear industry`s initiative for piloting the early resolution of siting-related issues before the detailed design proceedings of the combined operating license review. The ESP Demonstration Program consists of three phases. The plant parameters envelopes task is part of Phase 1, which addresses the generic review of applicable federal regulations and develops criteria for safety and environmental assessment of potential sites. The plant parameters envelopes identify parameters that characterize the interface between an ALWR design and a potential site, and quantify the interface through values selected from the Utility Requirements Documents, vendor design information, or engineering assessments. When augmented with site-specific information, the plant parameters envelopes provide sufficient information to allow ESPs to be granted based on individual ALWR design information or enveloping design information for the evolutionary, passive, or generic ALWR plants. This document is expected to become a living document when used by future applicants.

  4. Modeling mining economics and materials markets to inform criticality assessment and mitigation

    E-Print Network [OSTI]

    Poulizac, Claire Marie Franc?oise

    2013-01-01

    Conventional criticality-assessment methods drawn from the existing literature are often limited to evaluations of scarcity risks, or rely on price as an indicator of criticality. Such approaches, however, are ill-suited ...

  5. Power Plant Power Plant

    E-Print Network [OSTI]

    Stillwater Power Plant Wabuska Power Plant Casa Diablo Power Plant Glass Mountain Geothermal Area Lassen Geothermal Area Coso Hot Springs Power Plants Lake City Geothermal Area Thermo Geothermal Area Lakeview Geothermal Area Raft River Geothermal Area Cove Fort Power Plant Roosevelt Power Plant Borax Lake

  6. Resumption of thermal stabilization of plutonium oxide in Building 707, Rocky Flats Plant, Golden, Colorado. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The Department of Energy is proposing thermal stabilization to enhance the safe storage of plutonium at Rocky Flats Plant until decisions are made on long-term storage and disposition of the material. The proposed action is to resume thermal stabilization of pyrophoric plutonium in Building 707 at Rocky Flats Plant. Thermal stabilization would heat the pyrophoric plutonium under controlled conditions in a glovebox furnace to promote full oxidation and convert the material into stable plutonium oxide in the form of PuO{sub 2}. Other activities associated with thermal stabilization would include post-stabilization characterization of non-pyrophoric plutonium and on-site movement of pyrophoric and non-pyrophoric plutonium. This report covers; purpose and need; proposed action; alternatives to the proposed action; affected environment; environmental effects of proposed action and no action alternative; agencies and person consulted; and public participation.

  7. Enterprise Assessments Review of the Hanford Site Waste Treatment and Immobilization Plant Construction Quality Â… December 2015

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum12, 2015 Infographiclighbulbs -Immobilization Plant Low-Activity Waste Review of

  8. Solar Resource & Meteorological Assessment Project (SOLRMAP): Observed Atmospheric and Solar Information System (OASIS); Tucson, Arizona (Data)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Wilcox, S.; Andreas, A.

    2010-11-03

    The U.S. Department of Energy's National Renewable Energy Laboratory collaborates with the solar industry to establish high quality solar and meteorological measurements. This Solar Resource and Meteorological Assessment Project (SOLRMAP) provides high quality measurements to support deployment of power projects in the United States. The no-funds-exchanged collaboration brings NREL solar resource assessment expertise together with industry needs for measurements. The end result is high quality data sets to support the financing, design, and monitoring of large scale solar power projects for industry in addition to research-quality data for NREL model development. NREL provides consultation for instrumentation and station deployment, along with instrument calibrations, data acquisition, quality assessment, data distribution, and summary reports. Industry participants provide equipment, infrastructure, and station maintenance.

  9. Solar Resource & Meteorological Assessment Project (SOLRMAP): Observed Atmospheric and Solar Information System (OASIS); Tucson, Arizona (Data)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Wilcox, S.; Andreas, A.

    The U.S. Department of Energy's National Renewable Energy Laboratory collaborates with the solar industry to establish high quality solar and meteorological measurements. This Solar Resource and Meteorological Assessment Project (SOLRMAP) provides high quality measurements to support deployment of power projects in the United States. The no-funds-exchanged collaboration brings NREL solar resource assessment expertise together with industry needs for measurements. The end result is high quality data sets to support the financing, design, and monitoring of large scale solar power projects for industry in addition to research-quality data for NREL model development. NREL provides consultation for instrumentation and station deployment, along with instrument calibrations, data acquisition, quality assessment, data distribution, and summary reports. Industry participants provide equipment, infrastructure, and station maintenance.

  10. Produced water discharges to the Gulf of Mexico: Background information for ecological risk assessments

    SciTech Connect (OSTI)

    Meinhold, A.F.; Holtzman, S.; DePhillips, M.P.

    1996-06-01

    This report reviews ecological risk assessment concepts and methods; describes important biological resources in the Gulf of Mexico of potential concern for produced water impacts; and summarizes data available to estimate exposure and effects of produced water discharges. The emphasis is on data relating to produced water discharges in the central and western Gulf of Mexico, especially in Louisiana. Much of the summarized data and cited literature are relevant to assessments of impacts in other regions. Data describing effects on marine and estuarine fishes, mollusks, crustaceans and benthic invertebrates are emphasized. This review is part of a series of studies of the health and ecological risks from discharges of produced water to the Gulf of Mexico. These assessments will provide input to regulators in the development of guidelines and permits, and to industry in the use of appropriate discharge practices.

  11. Integrating Multiple Geographic Information Systems to Create a Versatile Land Evaluation Site Assessment Model

    E-Print Network [OSTI]

    Morrison, Grady

    2008-11-19

    GIS in Urban Planning Integrating Multiple Geographic Information Systems to Create a Versatile Land Suitability Analysis Model Grady Morrison Undergraduate Department of Geography University of Kansas gmorrisn@ku.edu Impervious Surface...

  12. An Information Systems Security Risk Assessment Model Under Dempster- Schafer Theory of Belief Functions

    E-Print Network [OSTI]

    Sun, Lili; Srivastava, Rajendra P.; Mock, Theodore J.

    2006-01-01

    This study develops an alternative methodology for the risk analysis of information systems security (ISS), an evidential reasoning approach under the Dempster-Shafer theory of belief functions. The approach has the following important dimensions...

  13. Social, governance, and economic impact assessment of information and communication technology interventions in rural India

    E-Print Network [OSTI]

    Kumar, Rajendra, 1967-

    2004-01-01

    Among the many initiatives in using information and communication technologies (ICTs) for development, telecenters or kiosks occupy a prominent place. These centers provide public access to these technologies and related ...

  14. Assessing the perception and reality of arguments against thermal waste treatment plants in terms of property prices

    SciTech Connect (OSTI)

    Phillips, K.J.O.; Longhurst, P.J.; Wagland, S.T., E-mail: s.t.wagland@cranfield.ac.uk

    2014-01-15

    Highlights: • Previous research studies have shown that EfW facilities negatively impact the local house prices. • In this study property prices surrounding 3 operational EfW plants were analysed. • No significant negative effect on property prices due to an incinerator was found. - Abstract: The thermal processing of waste materials, although considered to be an essential part of waste management, is often sharply contested in the UK. Arguments such as health, depletion of resources, cost, noise, odours, traffic movement and house prices are often cited as reasons against the development of such facilities. This study aims to review the arguments and identify any effect on property prices due to the public perception of the plant. A selection of existing energy from waste (EfW) facilities in the UK, operational for at least 7 years, was selected and property sales data, within 5 km of the sites, was acquired and analysed in detail. The locations of the properties were calculated in relation to the plant using GIS software (ArcGIS) and the distances split into 5 zones ranging from 0 to 5 km from the site. The local property sale prices, normalised against the local house price index, were compared in two time periods, before and after the facility became operational, across each of the 5 zones. In all cases analysed no significant negative effect was observed on property prices at any distance within 5 km from a modern operational incinerator. This indicated that the perceived negative effect of the thermal processing of waste on local property values is negligible.

  15. Recommended values for the distribution coefficient (Kd) to be used in dose assessments for decommissioning the Zion Nuclear Power Plant

    SciTech Connect (OSTI)

    Sullivan, T.

    2014-09-24

    ZionSolutions is in the process of decommissioning the Zion Nuclear Power Plant. The site contains two reactor Containment Buildings, a Fuel Building, an Auxiliary Building, and a Turbine Building that may be contaminated. The current decommissioning plan involves removing all above grade structures to a depth of 3 feet below grade. The remaining underground structures will be backfilled. The remaining underground structures will contain low amounts of residual licensed radioactive material. An important component of the decommissioning process is the demonstration that any remaining activity will not cause a hypothetical individual to receive a dose in excess of 25 mrem/y as specified in 10CFR20 SubpartE.

  16. Recommended values for the distribution coefficient (Kd) to be used in dose assessments for decommissioning the Zion Nuclear Power Plant

    SciTech Connect (OSTI)

    Sullivan T.

    2014-06-09

    ZionSolutions is in the process of decommissioning the Zion Nuclear Power Plant. The site contains two reactor Containment Buildings, a Fuel Building, an Auxiliary Building, and a Turbine Building that may be contaminated. The current decommissioning plan involves removing all above grade structures to a depth of 3 feet below grade. The remaining underground structures will be backfilled. The remaining underground structures will contain low amounts of residual licensed radioactive material. An important component of the decommissioning process is the demonstration that any remaining activity will not cause a hypothetical individual to receive a dose in excess of 25 mrem/y as specified in 10CFR20 SubpartE.

  17. Coal based synthetic fuel technology assessment guides

    SciTech Connect (OSTI)

    Not Available

    1981-09-01

    Seventeen synthetic fuel processes are described in detail and compared on a uniform basis. This work was supported by the Energy Information Administration for the purpose of technology assessment of the processes, their efficiency, the capitalized and operating cost of plants of similar size, possible constraints, possible siting problems, regional effects, pollution control, etc. (LTN)

  18. Bayesian Networks and Geographical Information Systems for Environmental Risk Assessment for Oil and Gas Site Development 

    E-Print Network [OSTI]

    Varela Gonzalez, Patricia Ysolda

    2013-04-03

    of the Environmental Sensibility of Oil and Gas (O&G) developments for a given study area. A Risk index associated with the development of O&G operation activities based on the spatial environmental sensibility was also mapped. To facilitate the Risk assessment...

  19. Compton DIV: Using a Compton-Based Gamma-Ray Imager for Design Information Verification of Uranium Enrichment Plants

    SciTech Connect (OSTI)

    Burks, M; Verbeke, J; Dougan, A; Wang, T; Decman, D

    2009-07-04

    A feasibility study has been performed to determine the potential usefulness of Compton imaging as a tool for design information verification (DIV) of uranium enrichment plants. Compton imaging is a method of gamma-ray imaging capable of imaging with a 360-degree field of view over a broad range of energies. These systems can image a room (with a time span on the order of one hour) and return a picture of the distribution and composition of radioactive material in that room. The effectiveness of Compton imaging depends on the sensitivity and resolution of the instrument as well the strength and energy of the radioactive material to be imaged. This study combined measurements and simulations to examine the specific issue of UF{sub 6} gas flow in pipes, at various enrichment levels, as well as hold-up resulting from the accumulation of enriched material in those pipes. It was found that current generation imagers could image pipes carrying UF{sub 6} in less than one hour at moderate to high enrichment. Pipes with low enriched gas would require more time. It was also found that hold-up was more amenable to this technique and could be imaged in gram quantities in a fraction of an hour. another questions arises regarding the ability to separately image two pipes spaced closely together. This depends on the capabilities of the instrument in question. These results are described in detail. In addition, suggestions are given as to how to develop Compton imaging as a tool for DIV.

  20. Assessment of Waste Treatment Plant Lab C3V (LB-S1) Stack Sampling Probe Location for Compliance with ANSI/HPS N13.1-1999

    SciTech Connect (OSTI)

    Glissmeyer, John A.; Geeting, John GH

    2013-02-01

    This report documents a series of tests used to assess the proposed air sampling location in the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Lab C3V (LB-S1) exhaust stack with respect to the applicable criteria regarding the placement of an air sampling probe. Federal regulations require that an air sampling probe be located in the exhaust stack in accordance with the criteria of American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999, Sampling and Monitoring Releases of Airborne Radioactive Substances from the Stack and Ducts of Nuclear Facilities. These criteria address the capability of the sampling probe to extract a sample that represents the effluent stream.

  1. Biochemical Conversion Pilot Plant (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2012-06-01

    This fact sheet provides information about Biochemical Conversion Pilot Plant capabilities and resources at NREL.

  2. ASSESSMENT OF THE RADIONUCLIDE COMPOSITION OF "HOT PARTICLES" SAMPLED IN THE CHERNOBYL NUCLEAR POWER PLANT FOURTH REACTOR UNIT

    SciTech Connect (OSTI)

    Farfan, E.; Jannik, T.; Marra, J.

    2011-10-01

    Fuel-containing materials sampled from within the Chernobyl Nuclear Power Plant (ChNPP) 4th Reactor Unit Confinement Shelter were spectroscopically studied for gamma and alpha content. Isotopic ratios for cesium, europium, plutonium, americium, and curium were identified and the fuel burnup in these samples was determined. A systematic deviation in the burnup values based on the cesium isotopes, in comparison with other radionuclides, was observed. The conducted studies were the first ever performed to demonstrate the presence of significant quantities of {sup 242}Cm and {sup 243}Cm. It was determined that there was a systematic underestimation of activities of transuranic radionuclides in fuel samples from inside of the ChNPP Confinement Shelter, starting from {sup 241}Am (and going higher), in comparison with the theoretical calculations.

  3. Information resources for assessing health effects from chemical exposure: Office of pesticides programs

    SciTech Connect (OSTI)

    Fenner-Crisp, P.

    1990-12-31

    The US Environmental Protection Agency (EPA) Office of Pesticide Programs is trying to develop a complete picture of a chemical`s toxicity and exposure profile. It is also important to share information in the office`s files because of pesticides, particularly as a consequence of agricultural use, find their way into places not necessarily intended.

  4. Environmental Assessment and Finding of No Significant Impact: Wastewater Treatment Capability Upgrade, Project NO. 96-D-122 Pantex Plant Amarillo, Texas

    SciTech Connect (OSTI)

    N /A

    1999-05-27

    This Environmental Assessment (EA) addresses the U.S. Department of Energy (DOE) proposed action regarding an upgrade of the Pantex Plant Wastewater Treatment Facility (WWTF). Potential environmental consequences associated with the proposed action and alternative actions are provided. DOE proposes to design, build, and operate a new WWTF, consistent with the requirements of Title 30 of the Texas Administrative Code (TAC), Chapter 317, ''Design Criteria for Sewage Systems,'' capable of supporting current and future wastewater treatment requirements of the Plant. Wastewater treatment at Pantex must provide sufficient operational flexibility to meet Pantex Plant's anticipated future needs, including potential Plant mission changes, alternative effluent uses, and wastewater discharge permit requirements. Treated wastewater effluent and non-regulated water maybe used for irrigation on DOE-owned agricultural land. Five factors support the need for DOE action: (1) The current WWTF operation has the potential for inconsistent permit compliance. (2) The existing WWTF lies completely within the 100-year floodplain. (3) The Pantex Plant mission has the potential to change, requiring infrastructure changes to the facility. (4) The life expectancy of the existing facility would be nearing its end by the time a new facility is constructed. (5) The treated wastewater effluent and non-regulated water would have a beneficial agricultural use through irrigation. Evaluation during the internal scoping led to the conclusion that the following factors are present and of concern at the proposed action site on Pantex Plant: (1) Periodic wastewater effluent permit exceedances; (2) Wetlands protection and floodplain management; (3) Capability of the existing facility to meet anticipated future needs of Pantex (4) Existing facility design life; and (5) Use of treated wastewater effluent and non-regulated water for irrigation. Evaluation during the internal scoping led to the conclusion that the following conditions are not present, nor of concern at the proposed site on Pantex Plant, and no further analysis was conducted: (1) State or national parks, forests, or other conservation areas; (2) Wild and scenic rivers; (3) Natural resources, such as timber, range, soils, minerals; (4) Properties of historic, archeological, or architectural significance; (5) Native American concerns; (6) Minority and low-income populations; and (7) Prime or unique farmland. In this document, DOE describes the proposed action and a reasonable range of alternatives to the proposed action, including the ''No-Action'' alternative. The proposed action cited in the ''U.S. Department of Energy Application for a Texas Pollutant Discharge Elimination System Permit Modifying Permit to Dispose of Waste, No. 02296,'' December 1998, included the construction of a new wastewater treatment facility, a new irrigation storage pond, and the conversion of the current wastewater treatment facility into an irrigation storage pond. Although a permit modification application has been filed, if a decision on this EA necessitates it, an amendment to the permit application would be made. The permit application would be required for any of the alternatives and the filing does not preclude or predetermine selection of an alternative considered by this EA. This permit change would allow Pantex to land-dispose treated wastewater by irrigating agricultural land. This construction for the proposed action would include designing two new lagoons for wastewater treatment. One of the lagoons could function as a facultative lagoon for treatment of wastewater. The second lagoon would serve as an irrigation storage impoundment (storage pond), with the alternative use as a facultative lagoon if the first lagoon is out of service for any reason. The new facultative lagoon and irrigation water storage pond would be sited outside of the 100-year flood plain. The existing WWTF lagoon would be used as a storage pond for treated wastewater effluent for irrigation water, as needed. The two new lagoons would be li

  5. Enterprise Assessments Follow-up Assessment of Safety Culture...

    Office of Environmental Management (EM)

    Follow-up Assessment of Safety Culture at the Hanford Site Waste Treatment and Immobilization Plant June 2015 Office of Worker Safety and Health Assessments Office of Environment,...

  6. Report on the remedial investigation of Bear Creek Valley at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 5: Appendix F -- Baseline human health risk assessment report

    SciTech Connect (OSTI)

    NONE

    1996-09-01

    This Remedial Investigation (RI) Report characterizes the nature and extent of contamination, evaluates the fate and transport of contaminants, and assesses risk to human health and the environment resulting from waste disposal and other US Department of Energy (DOE) operations in Bear Creek Valley (BCV). BCV, which is located within the DOE Oak Ridge Reservation (ORR) encompasses multiple waste units containing hazardous and radioactive wastes arising from operations at the adjacent Oak Ridge Y-12 Plant. The primary waste units discussed in this RI Report are the S-3 Site, Oil Landfarm (OLF), Boneyard/Burnyard (BYBY), Sanitary Landfill 1 (SL 1), and Bear Creek Burial Grounds (BCBG). These waste units, plus the contaminated media resulting from environmental transport of the wastes from these units, are the subject of this RI. This BCV RI Report represents the first major step in the decision-making process for the BCV watershed. The RI results, in concert with the follow-on FS will form the basis for the Proposed Plan and Record of Decision for all BCV sites. This comprehensive decision document process will meet the objectives of the watershed approach for BCV. Appendix F documents potential risks and provides information necessary for making remediation decisions. A quantitative analysis of the inorganic, organic, and radiological site-related contaminants found in various media is used to characterize the potential risks to human health associated with exposure to these contaminants.

  7. Risk-informed public safety policy for seismic events in the vicinity of a nuclear power plant

    E-Print Network [OSTI]

    Afolayan Jejeloye, Olubukola

    2002-01-01

    Nuclear Power Plants (NPPs) are potentially vulnerable to accidents, which can either be internally or externally initiated. External events include natural events like tornadoes, hurricanes, and earthquakes. The purpose ...

  8. Environmental assessment for the construction and operation of waste storage facilities at the Paducah Gaseous Diffusion Plant, Paducah, Kentucky

    SciTech Connect (OSTI)

    NONE

    1994-06-01

    DOE is proposing to construct and operate 3 waste storage facilities (one 42,000 ft{sup 2} waste storage facility for RCRA waste, one 42,000 ft{sup 2} waste storage facility for toxic waste (TSCA), and one 200,000 ft{sup 2} mixed (hazardous/radioactive) waste storage facility) at Paducah. This environmental assessment compares impacts of this proposed action with those of continuing present practices aof of using alternative locations. It is found that the construction, operation, and ultimate closure of the proposed waste storage facilities would not significantly affect the quality of the human environment within the meaning of NEPA; therefore an environmental impact statement is not required.

  9. Office of Enterprise Assessments Review of the Waste Isolation Pilot Plant Conduct of Maintenance Recovery Plan, December 2014

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (BillionProvedTravelInformationCollection Request Title:of Energy Office of

  10. Independent Oversight Follow-up Assessment of Safety Culture at the Waste Treatment and Immobilization Plant - June 2014

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (BillionProvedTravelInformation Resources » GeothermalPerformance withtoof Health, SafetyJanuary

  11. Tool for Rapid Assessment of City Energy (TRACE) | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoop Inc JumpHeterInformation PolicyTinna Group JumpTombigbeeTonon Group JumpRapid

  12. Rapid/PSM - lessons learned from using PSA for plant status monitoring

    SciTech Connect (OSTI)

    Chu, B.B.; Young, J.; Weinzimmer, F.

    1987-01-01

    Power plant operation requires decisions that can affect both the availability of the plant and its compliance with operating guidelines. Taking equipment out of service may affect the ability of the plant to produce power at a certain power level and may also affect the status of the plant with regard to technical specifications. However, plant operators and supervisors possess few tools that can rapidly determine plant availability and system status, can assess the impact on plant health (e.g., likelihood of continued operation) of taking equipment in or out of service, and can present information on required actions or desired alternatives. The plant status monitor (PSM), which is a part of Rapid software development under the risk assessment program of the Nuclear Power Division at the Electric Power Research Institute (EPRI), is designed to provide such information to plant personnel as an aid to their decision making. The Rapid/PSM can assist the management of plant safety and productivity and can minimize the potential technical specification violations. This paper describes the lessons learned from the development and demonstration of Rapid/PSM software at GPU Nuclear Corporation's (GPUN's) Oyster Creek Nuclear Generation Plant.

  13. Niland development project geothermal loan guaranty: 49-MW (net) power plant and geothermal well field development, Imperial County, California: Environmental assessment

    SciTech Connect (OSTI)

    Not Available

    1984-10-01

    The proposed federal action addressed by this environmental assessment is the authorization of disbursements under a loan guaranteed by the US Department of Energy for the Niland Geothermal Energy Program. The disbursements will partially finance the development of a geothermal well field in the Imperial Valley of California to supply a 25-MW(e) (net) power plant. Phase I of the project is the production of 25 MW(e) (net) of power; the full rate of 49 MW (net) would be achieved during Phase II. The project is located on approximately 1600 acres (648 ha) near the city of Niland in Imperial County, California. Well field development includes the initial drilling of 8 production wells for Phase I, 8 production wells for Phase II, and the possible need for as many as 16 replacement wells over the anticipated 30-year life of the facility. Activities associated with the power plant in addition to operation are excavation and construction of the facility and associated systems (such as cooling towers). Significant environmental impacts, as defined in Council on Environmental Quality regulation 40 CFR Part 1508.27, are not expected to occur as a result of this project. Minor impacts could include the following: local degradation of ambient air quality due to particulate and/or hydrogen sulfide emissions, temporarily increased ambient noise levels due to drilling and construction activities, and increased traffic. Impacts could be significant in the event of a major spill of geothermal fluid, which could contaminate groundwater and surface waters and alter or eliminate nearby habitat. Careful land use planning and engineering design, implementation of mitigation measures for pollution control, and design and implementation of an environmental monitoring program that can provide an early indication of potential problems should ensure that impacts, except for certain accidents, will be minimized.

  14. An assessment of potential for benefit from integrating geographic information systems technology into life-cycle management of infrastructures a focus for infrastructure management practice 

    E-Print Network [OSTI]

    Millegan, Harold Lynn

    1997-01-01

    AN ASSESSMENT OF POTE~ FOR BENEFIT FROM INTEGRATING GEOGRAPHIC INFORMATION SYSTEMS TECHNOLOGY INTO LIFE-CYCLE MANAGEMENT OF INFRASTRUCTURES A FOCUS FOR INFRASTRUCTURE MANAGEMENT PRACTICE A Thesis HAROLD LYNN MILLEGAN Submitted to the OIIIce.... Congress, Office of Technology Assessment 1991), This technology is not presently used to its potential and should be used more extensively by civil engineers. A proper focus is needed to integrate this spatially oriented technology to life-cycle...

  15. Assessing the direction of climate interactions by means of complex networks and information theoretic tools

    E-Print Network [OSTI]

    J. Ignacio Deza; Cristina Masoller; Marcelo Barreiro

    2015-02-04

    An estimate of the net direction of climate interactions in different geographical regions is made by constructing a directed climate network from a regular latitude-longitude grid of nodes, using a directionality index (DI) based on conditional mutual information. Two datasets of surface air temperature anomalies - one monthly-averaged and another daily-averaged - are analyzed and compared. The network links are interpreted in terms of known atmospheric tropical and extratropical variability patterns. Specific and relevant geographical regions are selected, the net direction of propagation of the atmospheric patterns is analyzed and the direction of the inferred links is validated by recovering some well-known climate variability structures. These patterns are found to be acting at various time-scales, such as atmospheric waves in the extra-tropics or longer range events in the tropics. This analysis demonstrates the capability of the DI measure to infer the net direction of climate interactions and may contribute to improve the present understanding of climate phenomena and climate predictability. The work presented here also stands out as an application of advanced tools to the analysis of empirical, real-world data.

  16. ORISE: Hazard Assessments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    programsprocedures Reconstruction of retrospective plant operation and health and safety programs ORISE and collaborators have, for example, conducted an assessment of health...

  17. RADIATION DOSE ASSESSMENT FOR THE BIOTA OF TERRESTRIAL ECOSYSTEMS IN THE SHORELINE ZONE OF THE CHERNOBYL NUCLEAR POWER PLANT COOLING POND

    SciTech Connect (OSTI)

    Farfan, E.; Jannik, T.

    2011-10-01

    Radiation exposure of the biota in the shoreline area of the Chernobyl Nuclear Power Plant Cooling Pond was assessed to evaluate radiological consequences from the decommissioning of the Cooling Pond. The article addresses studies of radioactive contamination of the terrestrial faunal complex and radionuclide concentration ratios in bodies of small birds, small mammals, amphibians, and reptiles living in the area. The data were used to calculate doses to biota using the ERICA Tool software. Doses from {sup 90}Sr and {sup 137}Cs were calculated using the default parameters of the ERICA Tool and were shown to be consistent with biota doses calculated from the field data. However, the ERICA dose calculations for plutonium isotopes were much higher (2-5 times for small mammals and 10-14 times for birds) than the doses calculated using the experimental data. Currently, the total doses for the terrestrial biota do not exceed maximum recommended levels. However, if the Cooling Pond is allowed to drawdown naturally and the contaminants of the bottom sediments are exposed and enter the biological cycle, the calculated doses to biota may exceed the maximum recommended values. The study is important in establishing the current exposure conditions such that a baseline exists from which changes can be documented following the lowering of the reservoir water. Additionally, the study provided useful radioecological data on biota concentration ratios for some species that are poorly represented in the literature.

  18. Feasibility Assessment of Water Energy Resources of the United States for New Low Power and Small Hydro Classes of Hydroelectric Plants

    SciTech Connect (OSTI)

    Douglas G. Hall

    2006-01-01

    Water energy resource sites identified in the resource assessment study reported in Water Energy Resources of the United States with Emphasis on Low Head/Low Power Resources, DOE/ID-11111, April 2004 were evaluated to identify which could feasibly be developed using a set of feasibility criteria. The gross power potential of the sites estimated in the previous study was refined to determine the realistic hydropower potential of the sites using a set of development criteria assuming they are developed as low power (less than 1 MW) or small hydro (between 1 and 30 MW) projects. The methodologies for performing the feasibility assessment and estimating hydropower potential are described. The results for the country in terms of the number of feasible sites, their total gross power potential, and their total hydropower potential are presented. The spatial distribution of the feasible potential projects is presented on maps of the conterminous U.S. and Alaska and Hawaii. Results summaries for each of the 50 states are presented in an appendix. The results of the study are also viewable using a Virtual Hydropower Prospector geographic information system application accessible on the Internet at: http://hydropower.inl.gov/prospector.

  19. Feasibility assessment of the water energy resources of the United States for new low power and small hydro classes of hydroelectric plants: Main report and Appendix A

    SciTech Connect (OSTI)

    Hall, Douglas G.; Reeves, Kelly S.; Brizzee, Julie; Lee, Randy D.; Carroll, Gregory R.; Sommers, Garold L.

    2006-01-01

    Water energy resource sites identified in the resource assessment study reported in Water Energy Resources of the United States with Emphasis on Low Head/Low Power Resources, DOE/ID-11111, April 2004 were evaluated to identify which could feasibly be developed using a set of feasibility criteria. The gross power potential of the sites estimated in the previous study was refined to determine the realistic hydropower potential of the sites using a set of development criteria assuming they are developed as low power (less than 1 MWa) or small hydro (between 1 and 30 MWa) projects. The methodologies for performing the feasibility assessment and estimating hydropower potential are described. The results for the country in terms of the number of feasible sites, their total gross power potential, and their total hydropower potential are presented. The spatial distribution of the feasible potential projects is presented on maps of the conterminous U.S. and Alaska and Hawaii. Results summaries for each of the 50 states are presented in an appendix. The results of the study are also viewable using a Virtual Hydropower Prospector geographic information system application accessible on the Internet at: http://hydropower.inl.gov/prospector.

  20. Caraustar Industries Energy Assessment

    SciTech Connect (OSTI)

    2010-06-25

    This plant-wide assessment case study is about commissioned energy assessments by the U.S. Department of Energy Industrial Technologies Program at two of Caraustar's recycled paperboard mills.

  1. Final environmental information volume for the coke oven gas cleaning project at the Bethlehem Steel Corporation Sparrows Point Plant

    SciTech Connect (OSTI)

    Not Available

    1990-04-24

    Bethelehem Steel Corporation (BSC) is planning to conduct a demonstration project involving an integrated system that can be retrofitted into coke oven gas handling systems to address a variety of environmental and operational factors in a more cost-effective manner. Successful application of this technology to existing US coke plants could: (1) reduce emissions of sulfur dioxide, cyanide, and volatile organic compounds (including benzene) (2) reduce the cost and handling of processing feed chemicals, (3) disposal costs of nuisance by-products and (4) increase reliability and reduce operation/maintenance requirements for coke oven gas desulfurization systems. The proposed system will remove sulfur from the coke oven gas in the form of hydrogen sulfide using the ammonia indigenous to the gas as the primary reactive chemical. Ammonia and hydrogen cyanide are also removed in this process. The hydrogen sulfide removed from the coke oven gas in routed to a modified Claus plant for conversion to a saleable sulfur by-product. Ammonia and hydrogen cyanide will be catalytically converted to hydrogen, nitrogen, carbon dioxide, and carbon monoxide. The tail gas from the sulfur recovery unit is recycled to the coke oven gas stream, upstream of the new gas cleaning system. The proposed demonstration project will be installed at the existing coke oven facilities at BSC's Sparrows Point Plant. This volume describes the proposed actions and the resulting environmental impacts. 21 refs., 19 figs., 9 tabs.

  2. Design and Feasibility Assessment of a Retrospective Epidemiological Study of Coal-Fired Power Plant Emissions in the Pittsburgh Pennsylvania Region

    SciTech Connect (OSTI)

    Richard A. Bilonick; Daniel Connell; Evelyn Talbott; Jeanne Zborowski; Myoung Kim

    2006-12-20

    Eighty-nine (89) percent of the electricity supplied in the 35-county Pittsburgh region (comprising parts of the states of Pennsylvania, Ohio, West Virginia, and Maryland) is generated by coal-fired power plants making this an ideal region in which to study the effects of the fine airborne particulates designated as PM{sub 2.5} emitted by the combustion of coal. This report demonstrates that during the period from 1999-2006 (1) sufficient and extensive exposure data, in particular samples of speciated PM{sub 2.5} components from 1999 to 2003, and including gaseous co-pollutants and weather have been collected, (2) sufficient and extensive mortality, morbidity, and related health outcomes data are readily available, and (3) the relationship between health effects and fine particulates can most likely be satisfactorily characterized using a combination of sophisticated statistical methodologies including latent variable modeling (LVM) and generalized linear autoregressive moving average (GLARMA) time series analysis. This report provides detailed information on the available exposure data and the available health outcomes data for the construction of a comprehensive database suitable for analysis, illustrates the application of various statistical methods to characterize the relationship between health effects and exposure, and provides a road map for conducting the proposed study. In addition, a detailed work plan for conducting the study is provided and includes a list of tasks and an estimated budget. A substantial portion of the total study cost is attributed to the cost of analyzing a large number of archived PM{sub 2.5} filters. Analysis of a representative sample of the filters supports the reliability of this invaluable but as-yet untapped resource. These filters hold the key to having sufficient data on the components of PM{sub 2.5} but have a limited shelf life. If the archived filters are not analyzed promptly the important and costly information they contain will be lost.

  3. PRELIMINARY ENVIRONMENTAL, HEALTH AND SAFETY RISK ASSESSMENT ON THE INTEGRATION OF A PROCESS UTILIZING LOW-ENERGY SOLVENTS FOR CARBON DIOXIDE CAPTURE ENABLED BY A COMBINATION OF ENZYMES AND VACUUM REGENERATION WITH A SUBCRITICAL PC POWER PLANT

    SciTech Connect (OSTI)

    Fitzgerald, David; Vidal, Rafael; Russell, Tania; Babcock, Doosan; Freeman, Charles; Bearden, Mark; Whyatt, Greg; Liu, Kun; Frimpong, Reynolds; Lu, Kunlei; Salmon, Sonja; House, Alan; Yarborough, Erin

    2014-12-31

    The results of the preliminary environmental, health and safety (EH&S) risk assessment for an enzyme-activated potassium carbonate (K2CO3) solution post-combustion CO2 capture (PCC) plant, integrated with a subcritical pulverized coal (PC) power plant, are presented. The expected emissions during normal steady-state operation have been estimated utilizing models of the PCC plant developed in AspenTech’s AspenPlus® software, bench scale test results from the University of Kentucky, and industrial experience of emission results from a slipstream PCC plant utilizing amine based solvents. A review of all potential emission species and their sources was undertaken that identified two credible emission sources, the absorber off-gas that is vented to atmosphere via a stack and the waste removed from the PCC plant in the centrifuge used to reclaim enzyme and solvent. The conditions and compositions of the emissions were calculated and the potential EH&S effects were considered as well as legislative compliance requirements. Potential mitigation methods for emissions during normal operation have been proposed and solutions to mitigate uncontrolled releases of species have been considered. The potential emissions were found to pose no significant EH&S concerns and were compliant with the Federal legislation reviewed. The limitations in predicting full scale plant performance from bench scale tests have been noted and further work on a larger scale test unit is recommended to reduce the level of uncertainty.

  4. Faculty Information Security Guide

    E-Print Network [OSTI]

    Faculty Information Security Guide Dartmouth Your information is vitally important to your teaching protect your information. THE DARTMOUTH INFORMATION SECURITY COMMITTEE The Dartmouth Information Security Committee (DISC) meets monthly to assess vulnerabilities of information security, and to develop and revise

  5. Groundwater quality assessment for the Chestnut Ridge Hydrogeologic Regime at the Y-12 Plant. 1991 groundwater quality data and calculated rate of contaminant migration

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    This report contains groundwater quality data obtained during the 1991 calendar year at several hazardous and non-hazardous waste- management facilities associated with the US Department of Energy (DOE) Y-12 Plant (Figure 1). These sites are located south of the Y-12 Plant in the Chestnut Ridge Hydrogeologic Regime (CRHR), which is one of the three regimes defined for the purposes of groundwater quality monitoring and remediation (Figure 2). The Health, Safety, Environment, and Accountability (HSEA) Division of the Y-12 Plant Environmental Management Department manages the groundwater monitoring activities in each regime as part of the Y-12 Plant Groundwater Protection Program (GWPP).

  6. Consequence Assessment

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-08-21

    This volume focuses on the process of performing timely initial assessments necessary to support critical first decisions and the continuous process of refining those initial assessments as more information and resources become available. Canceled by DOE G 151.1-4.

  7. Land-Use History and Contemporary Management Inform an Ecological Reference Model for Longleaf Pine Woodland Understory Plant Communities.

    SciTech Connect (OSTI)

    Brudvig, Lars A.; Orrock, John L.; Damschen, Ellen I.; et al, et al

    2014-01-23

    Ecological restoration is frequently guided by reference conditions describing a successfully restored ecosystem; however, the causes and magnitude of ecosystem degradation vary, making simple knowledge of reference conditions insufficient for prioritizing and guiding restoration. Ecological reference models provide further guidance by quantifying reference conditions, as well as conditions at degraded states that deviate from reference conditions. Many reference models remain qualitative, however, limiting their utility. We quantified and evaluated a reference model for southeastern U.S. longleaf pine woodland understory plant communities. We used regression trees to classify 232 longleaf pine woodland sites at three locations along the Atlantic coastal plain based on relationships between understory plant community composition, soils lol(which broadly structure these communities), and factors associated with understory degradation, including fire frequency, agricultural history, and tree basal area. To understand the spatial generality of this model, we classified all sites together. and for each of three study locations separately. Both the regional and location-specific models produced quantifiable degradation gradients–i.e., progressive deviation from conditions at 38 reference sites, based on understory species composition, diversity and total cover, litter depth, and other attributes. Regionally, fire suppression was the most important degrading factor, followed by agricultural history, but at individual locations, agricultural history or tree basal area was most important. At one location, the influence of a degrading factor depended on soil attributes. We suggest that our regional model can help prioritize longleaf pine woodland restoration across our study region; however, due to substantial landscape-to-landscape variation, local management decisions should take into account additional factors (e.g., soil attributes). Our study demonstrates the utility of quantifying degraded states and provides a series of hypotheses for future experimental restoration work. More broadly, our work provides a framework for developing and evaluating reference models that incorporate multiple, interactive anthropogenic drivers of ecosystem degradation.

  8. Proximity and Investment: Evidence from Plant-Level Data

    E-Print Network [OSTI]

    Giroud, Xavier

    Proximity to plants makes it easier for headquarters to monitor and acquire information about plants. In this article, I estimate the effects of headquarters’ proximity to plants on plant-level investment and productivity. ...

  9. Native Plants and PollinatorsNative Plants and PollinatorsNative Plants and PollinatorsNative Plants and Pollinators of Loney Meadowof Loney Meadowof Loney Meadowof Loney Meadow

    E-Print Network [OSTI]

    Ishida, Yuko

    Native Plants and PollinatorsNative Plants and PollinatorsNative Plants and PollinatorsNative Plants and Pollinators of Loney Meadowof Loney Meadowof Loney Meadowof Loney Meadow A walk with Dr.footwear. No dogs please.footwear. No dogs please. For more information please call: Kathy Van Zuuk, PlantFor more

  10. Tracking the Reliability of the U.S. Electric Power System: An Assessment of Publicly Available Information Reported to State Public Utility Commissions

    SciTech Connect (OSTI)

    LaCommare, Kristina H.; Eto, Joseph H.

    2008-10-10

    Large blackouts, such as the August 14-15, 2003 blackout in the northeasternUnited States and Canada, focus attention on the importance of reliable electric service. As public and private efforts are undertaken to improve reliability and prevent power interruptions, it is appropriate to assess their effectiveness. Measures of reliability, such as the frequency and duration of power interruptions, have been reported by electric utilities to state public utility commissions for many years. This study examines current state and utility practices for collecting and reporting electricity reliability information and discusses challenges that arise in assessing reliability because of differences among these practices. The study is based primarily on reliability information for 2006 reported by 123 utilities to 37 state public utility commissions.

  11. Tsunami Information Sources: Part 3

    E-Print Network [OSTI]

    Wiegel, Robert L.

    2006-01-01

    JSCE), Tsunami Evaluation Subcommittee of the Nuclear Civil127-137) Tsunami Assessment Method for Nuclear Power PlantsCommittee, Tsunami Assessment Method for Nuclear Power

  12. Technical and economic assessments of electrochemical energy storage systems: Topical report on the potential for savings in load-leveling battery and balance of plant costs

    SciTech Connect (OSTI)

    Abraham, J.; Binas, G.; Del Monaco, J.L.; Pandya, D.A.; Sharp, T.E.; Consiglio, J.A.

    1985-08-31

    The battery technologies considered in this study are zinc-bromide, lead-acid, zinc-chloride and sodium sulfur. Results of the study are presented in self contained sections in the following order: Balance of Plant, Zinc-Bromide, Lead-Acid, Zinc-chloride, and Sodium-Sulfur. The balance of plant cost estimates are examined first since the results of this section are utilized in the following battery sections to generate cost reductions in the battery plant costs for each of the battery technologies.

  13. Geothermal Plant Capacity Factors

    SciTech Connect (OSTI)

    Greg Mines; Jay Nathwani; Christopher Richard; Hillary Hanson; Rachel Wood

    2015-01-01

    The capacity factors recently provided by the Energy Information Administration (EIA) indicated this plant performance metric had declined for geothermal power plants since 2008. Though capacity factor is a term commonly used by geothermal stakeholders to express the ability of a plant to produce power, it is a term frequently misunderstood and in some instances incorrectly used. In this paper we discuss how this capacity factor is defined and utilized by the EIA, including discussion on the information that the EIA requests from operations in their 923 and 860 forms that are submitted both monthly and annually by geothermal operators. A discussion is also provided regarding the entities utilizing the information in the EIA reports, and how those entities can misinterpret the data being supplied by the operators. The intent of the paper is to inform the facility operators as the importance of the accuracy of the data that they provide, and the implications of not providing the correct information.

  14. Kentucky Department for Natural Resources and Environmental Protection permit application for air contaminant source: SRC-I demonstration plant, Newman, Kentucky. Appendix D. Impact assessment. [Demonstration plant at Newman, KY

    SciTech Connect (OSTI)

    none,

    1980-11-21

    In appendix D, the air quality condition for various pollutants in the areas surrounding the proposed demonstration plant site is given with respect to attainment or non-attainment of US EPA regulations. The minimum pollutant emission rates for these regulated and for several other pollutants are given. Then the estimated emission rates from the proposed plant are given for a dozen pollutants which exceed these limits and therefore require an ambient air quality analysis. This involves taking into account the estimated emission of these pollutants from the proposed plant and from other sources in the surrounding area. Finally, background data from the surrounding area including meteorological data and sampling of regulated pollutants are given. (LTN)

  15. Vascular Plants of the Hanford Site

    SciTech Connect (OSTI)

    Sackschewsky, Michael R.; Downs, Janelle L.

    2001-09-28

    This report provides an updated listing of the vascular plants present on and near the U.S. Department of Energy Hanford Site. This document is an update of a listing of plants prepared by Sackschewdky et al. in 1992. Since that time there has been a significant increase in the botanical knowledge of the Hanford Site. The present listing is based on an examination of herbarium collections held at PNNL, at WSU-Tri Cities, WSU-Pullman, Bringham Young University, and The University of Washington, and on examination of ecological literature derived from the Hanford and Benton county areas over the last 100 years. Based on the most recent analysis, there are approximately 725 different plant species that have been documented on or around the Hanford Site. This represents an approximate 20% increase in the number of species reported within Sackschewsky et al. (1992). This listing directly supports DOE and contractor efforts to assess the potential impacts of Hanford Site operations on the biological environment, including impacts to rare habitats and to species listed as endangered or\\ threatened. This document includes a listing of plants currently listed as endangered, threatened, or otherwise of concern to the Washington Natural Heritage Program or the U.S. Fish and Wildlife Service, as well as those that are currently listed as noxious weeds by the State of Washington. Also provided is an overview of how plants on the Hanford Site can be used by people. This information may be useful in developing risk assessment models, and as supporting information for clean-up level and remediation decisions.

  16. Supplemental information related to risk assessment for the off-site transportation of low-level mixed waste for the U.S. Department of Energy waste management programmatic environmental impact statement

    SciTech Connect (OSTI)

    Monette, F.A.; Biwer, B.M.; LePoire, D.J.; Lazaro, M.A.; Antonopoulos, A.A.; Hartmann, H.M.; Policastro, A.J.; Chen, S.Y. [Argonne National Lab., IL (United States). Environmental Assessment Div.] [Argonne National Lab., IL (United States). Environmental Assessment Div.

    1996-12-01

    This report provides supplemental information to support the human health risk assessment conducted for the transportation of low-level mixed waste (LLMW) in support of the US Department of Energy Waste Management Programmatic Environmental Impact Statement (WM PEIS). The assessment considers both the radioactive and chemical hazards associated with LLMW transportation. Detailed descriptions of the transportation health risk assessment methods and results of the assessment are presented in Appendix E of the WM PEIS. This report presents additional information that is not included in Appendix E but that was needed to conduct the transportation risk assessment for Waste Management (WM) LLMW. Included are definitions of the LLMW alternatives considered in the WM PEIS; data related to the inventory and to the physical, chemical, and radiological characteristics of WM LLMW; an overview of the risk assessment methods; and detailed results of the assessment for each WM LLMW case considered.

  17. A Framework for Environmental Assessment of CO2 Capture and Storage Systems

    E-Print Network [OSTI]

    Sathre, Roger

    2013-01-01

    Integrated Gasification Combined Cycle (IGCC) Power Plant.Analysis: Natural Gas Combined Cycle (NGCC) Power Plant.assessment of natural gas combined cycle power plant with

  18. The role of Life Cycle Assessment in identifying and reducing environmental impacts of CCS

    E-Print Network [OSTI]

    Sathre, Roger

    2011-01-01

    Integrated Gasification Combined Cycle (IGCC) Power Plant.Analysis: Natural Gas Combined Cycle (NGCC) Power Plant.assessment of natural gas combined cycle power plant with

  19. A best estimate method for the diagnosis and mitigation of multiple-failure transients in nuclear power plants 

    E-Print Network [OSTI]

    Martin, Robert Paul

    1989-01-01

    of uncertainty exists for a nuclear power plant operator during a transient situation. The expert reactor operator can respond to this information from experience, research, learning, or intuition; however, these concepts are not pro~le into a mechanistic.... These include a program for probabilistic risk assessment, '4 operauons analysis of the Savannah River reactors, ts automated monitoring of plant performance for the Oak Ridge National Laboratory High Flux Intensity Reactor, && and refuelling assistance...

  20. Transgenic approaches to altering carbon and nitrogen partitioning in whole plants: assessing the potential to improve crop yields and nutritional quality

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Yadav, Umesh P.; Ayre, Brian G.; Bush, Daniel R.

    2015-04-22

    The principal components of plant productivity and nutritional value, from the standpoint of modern agriculture, are the acquisition and partitioning of organic carbon (C) and nitrogen (N) compounds among the various organs of the plant. The flow of essential organic nutrients among the plant organ systems is mediated by its complex vascular system, and is driven by a series of transport steps including export from sites of primary assimilation, transport into and out of the phloem and xylem, and transport into the various import-dependent organs. Manipulating C and N partitioning to enhance yield of harvested organs is evident in the earliest crop domestication events and continues to be a goal for modern plant biology. Research on the biochemistry, molecular and cellular biology, and physiology of C and N partitioning has now matured to an extent that strategic manipulation of these transport systems through biotechnology are being attempted to improve movement from source to sink tissues in general, but also to target partitioning to specific organs. These nascent efforts are demonstrating the potential of applied biomass targeting but are also identifying interactions between essential nutrients that require further basic research. In this review, we summarize the key transport steps involved in C and N partitioning, and discuss various transgenic approaches for directly manipulating key C and N transporters involved. In addition, we propose several experiments that could enhance biomass accumulation in targeted organs while simultaneously testing current partitioning models.

  1. Transgenic approaches to altering carbon and nitrogen partitioning in whole plants: assessing the potential to improve crop yields and nutritional quality

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Yadav, Umesh P.; Ayre, Brian G.; Bush, Daniel R.

    2015-04-22

    The principal components of plant productivity and nutritional value, from the standpoint of modern agriculture, are the acquisition and partitioning of organic carbon (C) and nitrogen (N) compounds among the various organs of the plant. The flow of essential organic nutrients among the plant organ systems is mediated by its complex vascular system, and is driven by a series of transport steps including export from sites of primary assimilation, transport into and out of the phloem and xylem, and transport into the various import-dependent organs. Manipulating C and N partitioning to enhance yield of harvested organs is evident in themore »earliest crop domestication events and continues to be a goal for modern plant biology. Research on the biochemistry, molecular and cellular biology, and physiology of C and N partitioning has now matured to an extent that strategic manipulation of these transport systems through biotechnology are being attempted to improve movement from source to sink tissues in general, but also to target partitioning to specific organs. These nascent efforts are demonstrating the potential of applied biomass targeting but are also identifying interactions between essential nutrients that require further basic research. In this review, we summarize the key transport steps involved in C and N partitioning, and discuss various transgenic approaches for directly manipulating key C and N transporters involved. In addition, we propose several experiments that could enhance biomass accumulation in targeted organs while simultaneously testing current partitioning models.« less

  2. Supplemental information related to risk assessment for the off-site transportation of low-level waste for the U.S. Department of Energy waste management programmatic environmental impact statement

    SciTech Connect (OSTI)

    Monette, F.A.; Biwer, B.M.; LePoire, D.J.; Chen, S.Y. [Argonne National Lab., IL (United States). Environmental Assessment Div.

    1996-12-01

    This report presents supplemental information to support the human health risk assessment conducted for the transportation of low-level waste (LLW) in support of the US Department of Energy Waste Management Programmatic Environmental Impact Statement (WM PEIS). Detailed descriptions of the transportation health risk assessment method and results of the assessment are presented in Appendix E of the WM PEIS and are not repeated in this report. This report presents additional information that is not presented in Appendix E but that was needed to conduct the transportation risk assessment for Waste Management (WM) LLW. Included are definition of the LLW alternatives considered in the WM PEIS, data related to the inventory and to the physical and radiological characteristics of WM LLW, an overview of the risk assessment method, and detailed results of the assessment for each WM LLW alternative considered.

  3. Renewable Energy Plants in Your Gas Tank: From Photosynthesis...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plants in Your Gas Tank: From Photosynthesis to Ethanol (4 Activities) Renewable Energy Plants in Your Gas Tank: From Photosynthesis to Ethanol (4 Activities) Below is information...

  4. Resilient Monitoring Systems: Architecture, Design, and Application to Boiler/Turbine Plant

    SciTech Connect (OSTI)

    Garcia, Humberto E.; Lin, Wen-Chiao; Meerkov, Semyon M.; Ravichandran, Maruthi T.

    2014-11-01

    Resilient monitoring systems, considered in this paper, are sensor networks that degrade gracefully under malicious attacks on their sensors, causing them to project misleading information. The goal of this work is to design, analyze, and evaluate the performance of a resilient monitoring system intended to monitor plant conditions (normal or anomalous). The architecture developed consists of four layers: data quality assessment, process variable assessment, plant condition assessment, and sensor network adaptation. Each of these layers is analyzed by either analytical or numerical tools. The performance of the overall system is evaluated using a simplified boiler/turbine plant. The measure of resiliency is quantified using Kullback-Leibler divergence, and is shown to be sufficiently high in all scenarios considered.

  5. Waste Treatment and Immobilation Plant Pretreatment Facility

    Office of Environmental Management (EM)

    7 Technology Readiness Assessment for the Waste Treatment and Immobilization Plant (WTP) Pretreatment Facility L. Holton D. Alexander M. Johnson H. Sutter August 2007 Prepared by...

  6. Risk Assessment Fact Sheet

    E-Print Network [OSTI]

    US Army Corps of Engineers

    Risk Assessment ® Fact Sheet U.S. Army Corps of Engineers Building Strong ® Buffalo District June 2012 Risk Assessment A risk assessment is performed for hazardous, toxic, and radioactive waste sites and chemicals in the environment. Information from the risk assessment is used to determine whether action

  7. Case Study: Design and Assessment of an Enhanced Geographic In-formation System for Exploration of Multivariate Health Statistics

    E-Print Network [OSTI]

    Klippel, Alexander

    Case Study: Design and Assessment of an Enhanced Geographic In- formation System for Exploration of Multivariate Health Statistics Robert M. Edsall Department of Geography Arizona State University robedsall United States, within which are ap- proximately 800 "health service areas" (HSAs), multi- county units

  8. Pinellas Plant Environmental Baseline Report

    SciTech Connect (OSTI)

    Not Available

    1997-06-01

    The Pinellas Plant has been part of the Department of Energy`s (DOE) nuclear weapons complex since the plant opened in 1957. In March 1995, the DOE sold the Pinellas Plant to the Pinellas County Industry Council (PCIC). DOE has leased back a large portion of the plant site to facilitate transition to alternate use and safe shutdown. The current mission is to achieve a safe transition of the facility from defense production and prepare the site for alternative uses as a community resource for economic development. Toward that effort, the Pinellas Plant Environmental Baseline Report (EBR) discusses the current and past environmental conditions of the plant site. Information for the EBR is obtained from plant records. Historical process and chemical usage information for each area is reviewed during area characterizations.

  9. Save Energy Now Assessment Helps Expand Energy Management Program...

    Broader source: Energy.gov (indexed) [DOE]

    Documents & Publications Terra Nitrogen Company, L.P.: Ammonia Plant Greatly Reduces Natural Gas Consumption After Energy Assessment Goodyear Tire Plant Gains Traction on Energy...

  10. Enterprise Assessments Review of the Hanford Site Waste Treatment...

    Energy Savers [EERE]

    Site Waste Treatment and Immobilization Plant Construction Quality - June 2015 Enterprise Assessments Review of the Hanford Site Waste Treatment and Immobilization Plant...

  11. Distributed road assessment system

    DOE Patents [OSTI]

    Beer, N. Reginald; Paglieroni, David W

    2014-03-25

    A system that detects damage on or below the surface of a paved structure or pavement is provided. A distributed road assessment system includes road assessment pods and a road assessment server. Each road assessment pod includes a ground-penetrating radar antenna array and a detection system that detects road damage from the return signals as the vehicle on which the pod is mounted travels down a road. Each road assessment pod transmits to the road assessment server occurrence information describing each occurrence of road damage that is newly detected on a current scan of a road. The road assessment server maintains a road damage database of occurrence information describing the previously detected occurrences of road damage. After the road assessment server receives occurrence information for newly detected occurrences of road damage for a portion of a road, the road assessment server determines which newly detected occurrences correspond to which previously detected occurrences of road damage.

  12. Estimating overdispersion in the assessment of crime reduction interventions Paul R. Marchant, Leeds Metropolitan University, School of Information m

    E-Print Network [OSTI]

    Barber, Stuart

    , Leeds Metropolitan University, School of Information m Management, Leeds, LS6 3QS; email: p.marchant@leedsmet.ac.uk; phone: 0113 283 6109; fax: 0113 283 7599 Paul D. Baxter* and Stuart Barber, University of Leeds, Department of Statistics, Leeds LS2 9JT; email: pdbaxt@maths.leeds.ac.uk, stuart@maths.leeds.ac.uk; phone

  13. Environmental Information Document: L-reactor reactivation

    SciTech Connect (OSTI)

    Mackey, H.E. Jr.

    1982-04-01

    Purpose of this Environmental Information Document is to provide background for assessing environmental impacts associated with the renovation, restartup, and operation of L Reactor at the Savannah River Plant (SRP). SRP is a major US Department of Energy installation for the production of nuclear materials for national defense. The purpose of the restart of L Reactor is to increase the production of nuclear weapons materials, such as plutonium and tritium, to meet projected needs in the nuclear weapons program.

  14. Accident management information needs

    SciTech Connect (OSTI)

    Hanson, D.J.; Ward, L.W.; Nelson, W.R.; Meyer, O.R. (EG and G Idaho, Inc., Idaho Falls, ID (USA))

    1990-04-01

    In support of the US Nuclear Regulatory Commission (NRC) Accident Management Research Program, a methodology has been developed for identifying the plant information needs necessary for personnel involved in the management of an accident to diagnose that an accident is in progress, select and implement strategies to prevent or mitigate the accident, and monitor the effectiveness of these strategies. This report describes the methodology and presents an application of this methodology to a Pressurized Water Reactor (PWR) with a large dry containment. A risk-important severe accident sequence for a PWR is used to examine the capability of the existing measurements to supply the necessary information. The method includes an assessment of the effects of the sequence on the measurement availability including the effects of environmental conditions. The information needs and capabilities identified using this approach are also intended to form the basis for more comprehensive information needs assessment performed during the analyses and development of specific strategies for use in accident management prevention and mitigation. 3 refs., 16 figs., 7 tabs.

  15. Lead test assembly irradiation and analysis Watts Bar Nuclear Plant, Tennessee and Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    1997-07-01

    The U.S. Department of Energy (DOE) needs to confirm the viability of using a commercial light water reactor (CLWR) as a potential source for maintaining the nation`s supply of tritium. The Proposed Action discussed in this environmental assessment is a limited scale confirmatory test that would provide DOE with information needed to assess that option. This document contains the environmental assessment results for the Lead test assembly irradiation and analysis for the Watts Bar Nuclear Plant, Tennessee, and the Hanford Site in Richland, Washington.

  16. Assessment of the components of the Kalimantan and Sulawesi power development project: Volume 2. Export trade information

    SciTech Connect (OSTI)

    NONE

    1998-03-31

    This report, conducted by Utility Consulting was funded by the US Trade and Development Agency. The report concerns a power development project on the islands of Kalimantan and Sulawesi. This is TDA Volume 2, the main text (Report Volume 1), and it includes the following: (1) Introduction; (2) Transmission line and substation investment plan; (3) The distribution component; (4) Telecommunications; (5) PLN information systems; and Appendix: Figures and tables.

  17. Accident information needs

    SciTech Connect (OSTI)

    Hanson, D.J.; Arcieri, W.C.; Ward, L.W.

    1992-12-31

    A Five-step methodology has been developed to evaluate information needs for nuclear power plants under accident conditions and the availability of plant instrumentation during severe accidents. Step 1 examines the credible accidents and their relationships to plant safety functions. Step 2 determines the information personnel involved in accident management will need to understand plant behavior. Step 3 determines the capability of the instrumentation to function properly under severe accident conditions. Step 4 determines the conditions expected during the identified severe accidents. Step 5 compares the instrument capabilities and the severe accident conditions to evaluate the availability of the instrumentation to supply needed plant information.

  18. Accident information needs

    SciTech Connect (OSTI)

    Hanson, D.J.; Arcieri, W.C.; Ward, L.W.

    1992-01-01

    A Five-step methodology has been developed to evaluate information needs for nuclear power plants under accident conditions and the availability of plant instrumentation during severe accidents. Step 1 examines the credible accidents and their relationships to plant safety functions. Step 2 determines the information personnel involved in accident management will need to understand plant behavior. Step 3 determines the capability of the instrumentation to function properly under severe accident conditions. Step 4 determines the conditions expected during the identified severe accidents. Step 5 compares the instrument capabilities and the severe accident conditions to evaluate the availability of the instrumentation to supply needed plant information.

  19. Final Environmental Assessment and Finding of No Significant Impact: The Implementation of the Authorized Limits Process for Waste Acceptance at the C-746-U Landfill Paducah Gaseous Diffusion Plant Paducah, Kentucky

    SciTech Connect (OSTI)

    N /A

    2002-08-06

    The US Department of Energy (DOE) has completed an environmental assessment (DOE/EA-1414) for the proposed implementation of the authorized limits process for waste acceptance at the C-746-U Landfill at the Paducah Gaseous Diffusion Plant (PGDP) in Paducah, Kentucky. Based on the results of the impact analysis reported in the EA, which is incorporated herein by this reference, DOE has determined that the proposed action is not a major Federal action that would significantly affect the quality of the human environment within the context of the ''National Environmental Policy Act of 1969'' (NEPA). Therefore preparation of an environmental impact statement is not necessary, and DOE is issuing this Finding of No Significant Impact (FONSI).

  20. Idaho National Engineering Laboratory code assessment of the Rocky Flats transuranic waste

    SciTech Connect (OSTI)

    1995-07-01

    This report is an assessment of the content codes associated with transuranic waste shipped from the Rocky Flats Plant in Golden, Colorado, to INEL. The primary objective of this document is to characterize and describe the transuranic wastes shipped to INEL from Rocky Flats by item description code (IDC). This information will aid INEL in determining if the waste meets the waste acceptance criteria (WAC) of the Waste Isolation Pilot Plant (WIPP). The waste covered by this content code assessment was shipped from Rocky Flats between 1985 and 1989. These years coincide with the dates for information available in the Rocky Flats Solid Waste Information Management System (SWIMS). The majority of waste shipped during this time was certified to the existing WIPP WAC. This waste is referred to as precertified waste. Reassessment of these precertified waste containers is necessary because of changes in the WIPP WAC. To accomplish this assessment, the analytical and process knowledge available on the various IDCs used at Rocky Flats were evaluated. Rocky Flats sources for this information include employee interviews, SWIMS, Transuranic Waste Certification Program, Transuranic Waste Inspection Procedure, Backlog Waste Baseline Books, WIPP Experimental Waste Characterization Program (headspace analysis), and other related documents, procedures, and programs. Summaries are provided of: (a) certification information, (b) waste description, (c) generation source, (d) recovery method, (e) waste packaging and handling information, (f) container preparation information, (g) assay information, (h) inspection information, (i) analytical data, and (j) RCRA characterization.

  1. Physical Plant Power Plant - 32 

    E-Print Network [OSTI]

    Unknown

    2005-06-30

    Historically, a fixed cooling concept is used in the design of evaporative heat rejection systems for process and power plants. In the fixed cooling mode, a plant is designed for maximum output at the design summer wet bulb temperature...

  2. MHD plant turn down considerations

    SciTech Connect (OSTI)

    Lineberry, J.T.; Chapman, J.N.

    1991-01-01

    The topic of part load operation of the MHD power plant is assessed. Current and future planned MHD research is reviewed in terms of addressing topping and bottoming cycle integration needs. The response of the MHD generator to turn up and down scenarios is reviewed. The concept of turning the MHD power to met changes in plant load is discussed. The need for new ideas and focused research to study MHD plant integration and problems of plant turn down and up is cited. 7 refs., 5 figs., 1 tab.

  3. Feasibility Assessment of the Water Energy Resources of the United States for New Low Power and Small Hydro Classes of Hydroelectric Plants: Main Report and Appendix A

    Broader source: Energy.gov [DOE]

    Main Report and Appendix A: Evaluates water energy resource sites identified in the resource assessment study reported in Water Energy Resources of the United States with Emphasis on Low Head/Low Power Resources, DOE/ID-11111, April 2004 to identify which could feasibly be developed using a set of feasibility criteria. The gross power potential of the sites estimated in the previous study was refined to determine the realistic hydropower potential of the sites using a set of development criteria assuming they are developed as low power (less than 1 MWa) or small hydro (between 1 and 30 MWa) projects.

  4. Dow Chemical Company: Assessment Leads to Steam System Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Dow Chemical Company: Assessment Leads to Steam System Energy Savings in a Petrochemical Plant Dow Chemical Company: Assessment Leads to Steam System Energy Savings in a...

  5. Independent Oversight Follow-up Assessment of Safety Culture...

    Office of Environmental Management (EM)

    Follow-up Assessment of Safety Culture at the Waste Treatment and Immobilization Plant May 2011 June 2014 Office of Environment, Safety and Health Assessments Office of...

  6. Biopower Report Presents Methodology for Assessing the Value...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report Presents Methodology for Assessing the Value of Co-Firing Biomass in Pulverized Coal Plants Biopower Report Presents Methodology for Assessing the Value of Co-Firing...

  7. Enterprise Assessments Review of the Hanford Site Waste Treatment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Enterprise Assessments Review of the Hanford Site Waste Treatment and Immobilization Plant Construction Quality - June 2015 Enterprise Assessments Review of the Hanford Site Waste...

  8. Independent Activity Report, Hanford Plutonium Finishing Plant...

    Broader source: Energy.gov (indexed) [DOE]

    May 2012 Criticality Safety Information Meeting for the Hanford Plutonium Finishing Plant HIAR-RL-2012-05-14 This Independent Activity Report documents an oversight activity...

  9. Terra Nitrogen Company, L.P.: Ammonia Plant Greatly Reduces Natural...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Terra Nitrogen Company, L.P.: Ammonia Plant Greatly Reduces Natural Gas Consumption After Energy Assessment Terra Nitrogen Company, L.P.: Ammonia Plant Greatly Reduces Natural Gas...

  10. An assessment and evaluation for recycle/reuse of contaminated process and metallurgical equipment at the DOE Rocky Flats Plant Site -- Building 865. Final report

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    An economic analysis of the potential advantages of alternatives for recycling and reusing equipment now stored in Building 865 at the Rocky Flats Plant (RFP) in Colorado has been conducted. The inventory considered in this analysis consists primarily of metallurgical and process equipment used before January 1992, during development and production of nuclear weapons components at the site. The economic analysis consists of a thorough building inventory and cost comparisons for four equipment dispositions alternatives. The first is a baseline option of disposal at a Low Level Waste (LLW) landfill. The three alternatives investigated are metal recycling, reuse with the government sector, and release for unrestricted use. This report provides item-by-item estimates of value, disposal cost, and decontamination cost. The economic evaluation methods documented here, the simple cost comparisons presented, and the data provided as a supplement, should provide a foundation for D&D decisions for Building 865, as well as for similar D&D tasks at RFP and at other sites.

  11. Assessment of Differences in Phase 1 and Phase 2 Test Observations for Waste Treatment Plant Pulse Jet Mixer Tests with Non-Cohesive Solids

    SciTech Connect (OSTI)

    Meyer, Perry A.; Baer, Ellen BK; Bamberger, Judith A.; Fort, James A.; Minette, Michael J.

    2010-10-27

    The purpose of this work was to assess the apparent discrepancy in critical suspension velocity (UCS) between M3 Phase 1 (Meyer et al. 2009) and Phase 2 testing conducted by Energy Solutions (ES) at Mid-Columbia Engineering (MCE) and to address the applicability of Phase 1 scale-up laws to Phase 2 test results. Three Phase 2 test sequences were analyzed in detail. Several sources of discrepancy were identified including differences in nominal versus actual velocity, definition of model input parameters, and definition of UCS. A remaining discrepancy was shown to not be solely an artifact of Phase 1 data correlations, but was fundamental to the tests. The non-prototypic aspects of Phase 1 testing were reviewed and assessed. The effects of non-prototypic refill associated with the closed loop operation of the jets, previously known to affect cloud height, can be described in terms of a modified settling velocity. When the modified settling velocity is incorporated into the Phase 1 “new” physical model the adjusted new physical model does a better job of predicting the Phase 2 test results. The adjusted new physical model was bench marked with data taken during three prototypic drive tests. Scale-up behavior of the Phase 1 tests was reviewed. The applicability of the Phase 1 scale-up behavior to Phase 2 prototypic testing was analyzed. The effects of non-prototypic refill caused measured values of UCS to be somewhat reduced at larger scales. Hence the scale-up exponents are believed to be smaller than they would have been had there been prototypic refill. Estimated scale-up exponents for the Phase 2 testing are 0.40 for 8-tube tests and 0.36 for 12-tube tests.

  12. Assessment of technical strengths and information flow of energy conservation research in Japan. Volume 2. Background document

    SciTech Connect (OSTI)

    Hane, G.J.; Lewis, P.M.; Hutchinson, R.A.; Rubinger, B.; Willis, A.

    1985-06-01

    Purpose of this study is to explore the status of R and D in Japan and the ability of US researchers to keep abreast of Japanese technical advances. US researchers familiar with R and D activities in Japan were interviewed in ten fields that are relevant to the more efficient use of energy: amorphous metals, biotechnology, ceramics, combustion, electrochemical energy storage, heat engines, heat transfer, high-temperature sensors, thermal and chemical energy storage, and tribology. The researchers were questioned about their perceptions of the strengths of R and D in Japan, comparative aspects of US work, and the quality of available information sources describing R and D in Japan. Of the ten related fields, the researchers expressed a strong perception that significant R and D is under way in amorphous metals, biotechnology, and ceramics, and that the US competitive position in these technologies will be significantly challenged. Researchers also identified alternative emphases in Japanese R and D programs in these areas that provide Japan with stronger technical capabilities. For example, in biotechnology, researchers noted the significant Japanese emphasis on industrial-scale bioprocess engineering, which contrasts with a more meager effort in the US. In tribology, researchers also noted the strength of the chemical tribology research in Japan and commented on the effective mix of chemical and mechanical tribology research. This approach contrasts with the emphasis on mechanical tribology in the US.

  13. Assessment of the influences of groundwater colloids on the migration of technetium-99 at the Paducah Gaseous Diffusion Plant Site in Paducah, Kentucky

    SciTech Connect (OSTI)

    Gu, B.; McDonald, J.A.; McCarthy, J.F. [Oak Ridge National Lab., TN (United States); Clausen, J.L. [Paducah Gaseous Diffusion Plant, KY (United States). Environmental Restoration and Waste Management

    1994-07-01

    This short report summarizes the influences of groundwater colloids on the migration/transport of {sup 99}Tc at the Paducah Gaseous Diffusion Plant (PGDP) site in Paducah, Kentucky. Limited data suggest that inorganic colloidal materials (e.g., aluminosilicate clay minerals) may not play a significant role in the retention and transport of Tc. Studies by size fractionation reveal that both Tc and natural organic matter (NOM) are largely present in the <3K fraction. The role of NOM on Tc retention and transport is not conclusive on the basis of this study. However, a literature review suggests that Tc is very likely associated with the groundwater organics. The presence of the organic matter could have increased the solubility and cotransport of Tc at the PGDP site. Further studies, applying such techniques as gel chromatography, size exclusion, and spectroscopy, may be useful to determine the association of organic matter with Tc. If Tc is associated with groundwater organics, appropriate protocols for removal of organic matter associated with Tc may be developed. Time and resources were limited so this study is not comprehensive with respect to the role of mobile organic and inorganic colloidal materials on Tc transport in subsurface soils. The redox conditions (DO) of groundwaters reported may not represent the true groundwater conditions, which could have influenced the association and dissociation of Tc with groundwater colloidal materials. Because Tc concentrations in the groundwater (on the order of nCi/L) at the PGDP site is much lower than the solubility of reduced Tc (IV) (on the order of {approximately}10{sup {minus}8} mol/L or parts per billion), regardless of the redox conditions, Tc will stay in solution phase as TC(IV) or Tc(VII). The mechanisms of adsorption/association vs precipitation must be understood under reduced and low Tc conditions so that strategic plans for remediation of Tc contaminated soils and groundwaters can be developed.

  14. Dynamical systems probabilistic risk assessment.

    SciTech Connect (OSTI)

    Denman, Matthew R.; Ames, Arlo Leroy

    2014-03-01

    Probabilistic Risk Assessment (PRA) is the primary tool used to risk-inform nuclear power regulatory and licensing activities. Risk-informed regulations are intended to reduce inherent conservatism in regulatory metrics (e.g., allowable operating conditions and technical specifications) which are built into the regulatory framework by quantifying both the total risk profile as well as the change in the risk profile caused by an event or action (e.g., in-service inspection procedures or power uprates). Dynamical Systems (DS) analysis has been used to understand unintended time-dependent feedbacks in both industrial and organizational settings. In dynamical systems analysis, feedback loops can be characterized and studied as a function of time to describe the changes to the reliability of plant Structures, Systems and Components (SSCs). While DS has been used in many subject areas, some even within the PRA community, it has not been applied toward creating long-time horizon, dynamic PRAs (with time scales ranging between days and decades depending upon the analysis). Understanding slowly developing dynamic effects, such as wear-out, on SSC reliabilities may be instrumental in ensuring a safely and reliably operating nuclear fleet. Improving the estimation of a plant's continuously changing risk profile will allow for more meaningful risk insights, greater stakeholder confidence in risk insights, and increased operational flexibility.

  15. Integrated Risk Assessment for the LaSalle Unit 2 Nuclear Power Plant, Phenomenology and Risk Uncertainty Evaluation Program (PRUEP), MELCOR code calculations. Volume 3

    SciTech Connect (OSTI)

    Shaffer, C.J. [Science and Engineering Associates, Albuquerque, NM (United States); Miller, L.A.; Payne, A.C. Jr.

    1992-10-01

    A Level III Probabilistic Risk Assessment (PRA) has been performed for LaSalle Unit 2 under the Risk Methods Integration and Evaluation Program (RMIEP) and the Phenomenology and Risk Uncertainty Evaluation Program (PRUEP). This report documents the phenomenological calculations and sources of. uncertainty in the calculations performed with HELCOR in support of the Level II portion of the PRA. These calculations are an integral part of the Level II analysis since they provide quantitative input to the Accident Progression Event Tree (APET) and Source Term Model (LASSOR). However, the uncertainty associated with the code results must be considered in the use of the results. The MELCOR calculations performed include four integrated calculations: (1) a high-pressure short-term station blackout, (2) a low-pressure short-term station blackout, (3) an intermediate-term station blackout, and (4) a long-term station blackout. Several sensitivity studies investigating the effect of variations in containment failure size and location, as well as hydrogen ignition concentration are also documented.

  16. Integrated Risk Assessment for the LaSalle Unit 2 Nuclear Power Plant, Phenomenology and Risk Uncertainty Evaluation Program (PRUEP), MELCOR code calculations

    SciTech Connect (OSTI)

    Shaffer, C.J. (Science and Engineering Associates, Albuquerque, NM (United States)); Miller, L.A.; Payne, A.C. Jr.

    1992-10-01

    A Level III Probabilistic Risk Assessment (PRA) has been performed for LaSalle Unit 2 under the Risk Methods Integration and Evaluation Program (RMIEP) and the Phenomenology and Risk Uncertainty Evaluation Program (PRUEP). This report documents the phenomenological calculations and sources of. uncertainty in the calculations performed with HELCOR in support of the Level II portion of the PRA. These calculations are an integral part of the Level II analysis since they provide quantitative input to the Accident Progression Event Tree (APET) and Source Term Model (LASSOR). However, the uncertainty associated with the code results must be considered in the use of the results. The MELCOR calculations performed include four integrated calculations: (1) a high-pressure short-term station blackout, (2) a low-pressure short-term station blackout, (3) an intermediate-term station blackout, and (4) a long-term station blackout. Several sensitivity studies investigating the effect of variations in containment failure size and location, as well as hydrogen ignition concentration are also documented.

  17. Next Generation Nuclear Plant GAP Analysis Report

    SciTech Connect (OSTI)

    Ball, Sydney J; Burchell, Timothy D; Corwin, William R; Fisher, Stephen Eugene; Forsberg, Charles W.; Morris, Robert Noel; Moses, David Lewis

    2008-12-01

    As a follow-up to the phenomena identification and ranking table (PIRT) studies conducted recently by NRC on next generation nuclear plant (NGNP) safety, a study was conducted to identify the significant 'gaps' between what is needed and what is already available to adequately assess NGNP safety characteristics. The PIRT studies focused on identifying important phenomena affecting NGNP plant behavior, while the gap study gives more attention to off-normal behavior, uncertainties, and event probabilities under both normal operation and postulated accident conditions. Hence, this process also involved incorporating more detailed evaluations of accident sequences and risk assessments. This study considers thermal-fluid and neutronic behavior under both normal and postulated accident conditions, fission product transport (FPT), high-temperature metals, and graphite behavior and their effects on safety. In addition, safety issues related to coupling process heat (hydrogen production) systems to the reactor are addressed, given the limited design information currently available. Recommendations for further study, including analytical methods development and experimental needs, are presented as appropriate in each of these areas.

  18. Transgenic plants with altered senescence characteristics

    DOE Patents [OSTI]

    Amasino, Richard M. (Madison, WI); Gan, Susheng (Lexington, KY); Noh, Yoo-Sun (Madison, WI)

    2002-03-19

    The identification of senescence-specific promoters from plants is described. Using information from the first senescence-specific promoter, SAG12 from Arabidopsis, other homologous promoters from another plant have been identified. Such promoters may be used to delay senescence in commercially important plants.

  19. LETTER REPORT SUMMARY RESULTS OF THE NRC TEAM INTERACTION SKILLS STUDY AT DIABLO CANYON POWER PLANT

    SciTech Connect (OSTI)

    Hauth, J. T.; Toquam, J. L.; Bramwell, A. T.; Fleming, T. E.

    1990-12-01

    This report presents information to participants in the Team Interaction Skills study conducted at Diablo Canyon Power Plant from September to November 1989. A study was conducted to develop and assess measures of team interaction skills of nuclear power plant control room crews in simulated emergency conditions. Data were collected at a boiling water reactor (BWR) and pressurized water reactor (PWA) using three sets of rating scales; Behaviorally Anchored Rating Scales (BARS), Behavioral Frequency rating scales, and Technical Performance rating scales. Diablo Canyon Power Plant agreed to serve as the PWR plant in the study. Obse!Vers consisting of contract license examiners, Diablo Canyon Power Plant training instructors, and project staff used the rating scales to provide assessments of team interaction skills and technical skills of control room crews during emerg-3ncy scenarios as part of license requalification training. Crew members were also asked to providH self-ratings of their performance to gather information regarding crew responses to the Team Interactions Skills rating scales.

  20. Kentucky Department for Natural Resources and Environmental Protection permit application for air contaminant source: SRC-I demonstration plant, Newman, Kentucky. Supplement I. [Additional information on 38 items requested by KY/DNREP

    SciTech Connect (OSTI)

    Pearson, Jr., John F.

    1981-02-13

    In response to a letter from KY/DNREP, January 19, 1981, ICRC and DOE have prepared the enclosed supplement to the Kentucky Department for Natural Resources and Environmental Protection Permit Application for Air Contaminant Source for the SRC-I Demonstration Plant. Each of the 38 comments contained in the letter has been addressed in accordance with the discussions held in Frankfort on January 28, 1981, among representatives of KY/DNREP, EPA Region IV, US DOE, and ICRC. The questions raised involve requests for detailed information on the performance and reliability of proprietary equipment, back-up methods, monitoring plans for various pollutants, composition of wastes to flares, emissions estimates from particular operations, origin of baseline information, mathematical models, storage tanks, dusts, etc. (LTN)

  1. The SONATRACH jumbo LPG plant

    SciTech Connect (OSTI)

    Ahmed Khodja, A.; Bennaceur, A.

    1988-01-01

    The authors aim is to give to the 17 TH world gas conference a general idea on SONATRACH LPG PLANT which is located in the ARZEW area. They develop this communication as follows: general presentation of LPG plant: During the communication, the author's will give the assistance all the information concerning the contractions the erection's date and the LPG PLANT process, start-up of the plant: In this chapter, the authors's will describe the start-up condition, the performance test result, the flexibility test result and the total mechanical achievement of the plant; operation by SONATRACH: After the success that obtained during the mechanical achievement and performance test, the contractor handed over the plant to SONATRACH.

  2. Toward the autojuggie: Planting 72 geophones in 2 seconds

    E-Print Network [OSTI]

    Steeples, Don W.; Baker, Gregory S.; Schmeissner, Chris M.

    1999-04-15

    Shallow seismic reflection surveys require dense spatial wave-field sampling, contributing to their high cost. To assess the feasibility of planting geophones automatically, we planted 72 geophones in approximately 2 s in a test line, using an 11-m...

  3. Image Utility Assessment and a Relationship with Image Quality Assessment

    E-Print Network [OSTI]

    Hemami, Sheila S.

    Image Utility Assessment and a Relationship with Image Quality Assessment David M. Rouse , Romuald information to humans, and this paper investigates the utility assessment task, where human observers evaluate the usefulness of a natural image as a surrogate for a reference. Current QA algorithms implicitly assess utility

  4. Journal of Agricultural & Food Information, 10:102112, 2009 Copyright Taylor & Francis Group, LLC

    E-Print Network [OSTI]

    Peterson, Robert K. D.

    .e., genetically modified plants or genetically engineered plants). Plants derived from biotechnology containJournal of Agricultural & Food Information, 10:102­112, 2009 Copyright © Taylor & Francis Group

  5. RADIOLOGICAL EMERGENCY RESPONSE PLANNING FOR NUCLEAR POWER PLANTS IN CALIFORNIA. VOLUME 4 OF THE FINAL REPORT ON HEALTH AND SAFETY IMPACTS OF NUCLEAR, GEOTHERMAL, AND FOSSIL-FUEL ELECTRIC GENERATION IN CALIFORNIA

    E-Print Network [OSTI]

    Yen, W.W.S.

    2010-01-01

    of radiological risk from nuclear power plants, One suchreservation in risk assessment for nuclear power plants isrisks to populations surrounding a nuclear power plant by

  6. Tsunami Information Sources: Part 4 (With a section on impulsively generated waves by a rapid mass movement, either submerged, or into a body of water)

    E-Print Network [OSTI]

    Wiegel, Robert L.

    2008-01-01

    Issues in Tsunami Hazard Assessment of Nuclear Power Plant274 pp Tsunami Assessment Method for Nuclear Power Plants inIssues in Tsunami Hazard Assessment of Nuclear Power Plant

  7. Tsunami Information Sources: Part 4 (With a section on impulsively generated waves by a rapid mass movement, either submerged, or into a body of water)

    E-Print Network [OSTI]

    Wiegel, Robert L.

    2008-01-01

    Tsunami Assessment Method for Nuclear Power Plants in Japan,Tsunami Assessment Methods for Nuclear Power Plants in Japan,Tsunami Assessment Method for Nuclear Power Plants in Japan,

  8. Pre-conceptual Design Assessment of DEMO Remote Maintenance

    E-Print Network [OSTI]

    Loving, A; Sykes, N; Iglesias, D; Coleman, M; Thomas, J; Harman, J; Fischer, U; Sanz, J; Siuko, M; Mittwollen, M; others,

    2013-01-01

    EDFA, as part of the Power Plant Physics and Technology programme, has been working on the pre-conceptual design of a Demonstration Power Plant (DEMO). As part of this programme, a review of the remote maintenance strategy considered maintenance solutions compatible with expected environmental conditions, whilst showing potential for meeting the plant availability targets. A key finding was that, for practical purposes, the expected radiation levels prohibit the use of complex remote handling operations to replace the first wall. In 2012/13, these remote maintenance activities were further extended, providing an insight into the requirements, constraints and challenges. In particular, the assessment of blanket and divertor maintenance, in light of the expected radiation conditions and availability, has elaborated the need for a very different approach from that of ITER. This activity has produced some very informative virtual reality simulations of the blanket segments and pipe removal that are exceptionally ...

  9. Comparative risk analysis for the Rocky Flats Plant Integrated Project Planning

    SciTech Connect (OSTI)

    Jones, M.E.; Shain, D.I.

    1994-12-31

    The Rocky Flats Plant is developing a comprehensive planning strategy that will support transition of the Rocky Flats Plant from a nuclear weapons production facility to site cleanup and final disposition. Final disposition of the Rocky Flats Plant materials and contaminants requires consideration of the interrelated nature of sitewide problems, such as material movement and disposition, facility and land use endstates, costs, relative risks to workers and the public, and waste disposition. Comparative Risk Analysis employs both incremental risk and cumulative risk evaluations to compare risk from postulated options or endstates. Comparative Risk Analysis is an analytical tool for the Rocky Flats Plant Integrated Project Planning which can assist a decision-maker in evaluating relative risks among proposed remedial options or future endstates. It addresses the cumulative risks imposed by the Rocky Flats Plant and provides risk information, both human health and ecological, to aid in reducing unnecessary resource and monetary expenditures. Currently, there is no approved methodology that aggregates various risk estimates. Along with academic and field expert review, the Comparative Risk Analysis methodology is being reviewed and refined. A Rocky Flats Plant Risk Assessment Focus Group was established. Stakeholder involvement in the development provides an opportunity to influence the information delivered to a decision-maker. This paper discusses development of the methodology.

  10. Physical Plant Power Plant - 43 

    E-Print Network [OSTI]

    Unknown

    2005-06-30

    with higher efficiency / R&D Climate friendly Power Plants Build coal fired Power Plants with CCS-technology 4 B a c k u p va W GGEHEN ESL-IC-08-10-27 Proceedings of the Eighth International Conference for Enhanced Building Operations, Berlin, Germany..., October 20-22, 2008 RWE Energy / Energieeffizienz bei Immobilien / U. K?nig / ICEBO '08 SEITE 9 Electricity Production: All Energy Sources have to be included! Lignite Power Plant (BoA) produces 8,8 TWh = appr. 12% of the annual demand for electricity...

  11. Integrated Assessment | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas: Energy ResourcesOrder at 8, 13 (Vt.InfinifuelInova EnergyIntan Carbon

  12. Assess Oportunities | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EAandAmminex A SOpenAshley, Ohio: Energy- TransportAspinwall,Power

  13. Energy Consumption Series: Assessment of energy use in multibuilding facilities

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    This study originally had two primary objectives: (1) to improve EIA`s estimates of district heat consumption for commercial buildings in the CBECS sample that lacked individual metering and (2) to provide a basis for estimating primary fuel consumption by central plants serving commercial buildings. These objectives were expanded to include additional questions relating to these central plants. Background information is provided on the CBECS and on district heating and cooling, which is the most important type of energy-related service provided by multibuilding facilities with central physical plants. Chapters 2 and 3 present data results on multibuilding facilities from the 1989 CBECS and the pilot Facility Survey. Chapter 2 presents the characteristics of multibuilding facilities and the individual buildings located on these facilities. Chapter 3 provides estimates of energy inputs and outputs of multibuilding facilities with central physical plants. Chapter 4 assesses the quality of the pilot Facility Survey and includes recommendations for future work in this area. The appendices provide more detailed information on the Facility Survey itself, in particular the limitations on the use of these results. Appendix B, ``Data Quality``, provides detailed information relating to the limitations of the data and the conclusions presented in this report. As a pilot study, the 1989 Facility Survey has some serious flaws and limitations which are recognized in this report.

  14. Waste Treatment and Immobilization Plant (WTP) Analytical Laboratory...

    Office of Environmental Management (EM)

    2 Technology Readiness Assessment for the Waste Treatment and Immobilization Plant (WTP) Analytical Laboratory, Balance of Facilities and LAW Waste Vitrification Facilities L....

  15. Waste Treatment and Immobilation Plant HLW Waste Vitrification...

    Office of Environmental Management (EM)

    6 Technology Readiness Assessment for the Waste Treatment and Immobilization Plant (WTP) HLW Waste Vitrification Facility L. Holton D. Alexander C. Babel H. Sutter J. Young August...

  16. Goodyear Tire Plant Gains Traction on Energy Savings After Completing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Documents & Publications Terra Nitrogen Company, L.P.: Ammonia Plant Greatly Reduces Natural Gas Consumption After Energy Assessment Steam System Efficiency Optimized After J.R....

  17. Environmental Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformation Current HABFES October 27th, 2010Environment, Health, SafetyThis isASSESSMENT

  18. Performance Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformationJesseworkSURVEYI/O StreamsParticipantsPartiesOriginalPerformance assessment (PA)

  19. Tsunami Information Sources

    E-Print Network [OSTI]

    Wiegel, Robert L

    2005-01-01

    Tsunami Assessment Manual for Nuclear Facilities," In 21st International Tsunami Symposium, IUGG XXIII General Assembly, Sapporo, Japan,Tsunami Behaviors Near the Ulchin Nuclear Power Plant," In 21st International Tsunami Symposium, IUGG XXIII General Assembly, Sapporo, Japan,

  20. Rocky Flats Plant Site Environmental Report for 1992

    SciTech Connect (OSTI)

    Cirrincione, D.A.; Erdmann, N.L.

    1992-12-31

    The Rocky Rats Plant Site Environmental Report provides summary information on the plant`s environmental monitoring programs and the results recorded during 1992. The report contains a compliance summary, results of environmental monitoring and other related programs, a review of environmental remediation activities, information on external gamma radiation dose monitoring, and radiation dose estimates for the surrounding population.

  1. Overview of enrichment plant safeguards

    SciTech Connect (OSTI)

    Swindle, D.W. Jr.; Wheeler, L.E.

    1982-01-01

    The relationship of enrichment plant safeguards to US nonproliferation objectives and to the operation and management of enrichment facilities is reviewed. During the review, the major components of both domestic and international safeguards systems for enrichment plants are discussed. In discussing domestic safeguards systems, examples of the technology currently in use to support nuclear materials accountability are described including the measurement methods, procedures and equipment used for weighing, sampling, chemical and isotopic analyses and nondestructive assay techniques. Also discussed is how the information obtained as part of the nuclear material accountancy task is useful to enrichment plant operations. International material accountancy verification and containment/surveillance concepts for enrichment plants are discussed, and the technologies presently being developed for international safeguards in enrichment plants are identified and the current development status is reported.

  2. Nuclear power plant Generic Aging Lessons Learned (GALL). Appendix B

    SciTech Connect (OSTI)

    Kasza, K.E.; Diercks, D.R.; Holland, J.W.; Choi, S.U.

    1996-12-01

    The purpose of this generic aging lessons learned (GALL) review is to provide a systematic review of plant aging information in order to assess materials and component aging issues related to continued operation and license renewal of operating reactors. Literature on mechanical, structural, and thermal-hydraulic components and systems reviewed consisted of 97 Nuclear Plant Aging Research (NPAR) reports, 23 NRC Generic Letters, 154 Information Notices, 29 Licensee Event Reports (LERs), 4 Bulletins, and 9 Nuclear Management and Resources Council Industry Reports (NUMARC IRs) and literature on electrical components and systems reviewed consisted of 66 NPAR reports, 8 NRC Generic Letters, 111 Information Notices, 53 LERs, 1 Bulletin, and 1 NUMARC IR. More than 550 documents were reviewed. The results of these reviews were systematized using a standardized GALL tabular format and standardized definitions of aging-related degradation mechanisms and effects. The tables are included in volume s 1 and 2 of this report. A computerized data base has also been developed for all review tables and can be used to expedite the search for desired information on structures, components, and relevant aging effects. A survey of the GALL tables reveals that all ongoing significant component aging issues are currently being addressed by the regulatory process. However, the aging of what are termed passive components has been highlighted for continued scrutiny. This report consists of Volume 2, which consists of the GALL literature review tables for the NUMARC Industry Reports reviewed for the report.

  3. EARLY ENTRANCE COPRODUCTION PLANT

    SciTech Connect (OSTI)

    Fred D. Brent; Lalit Shah; Earl Berry; Charles H. Schrader; John Anderson; Ming He; James F. Stevens; Centha A. Davis; Michael Henley; Jerome Mayer; Harry Tsang; Jimell Erwin; Jennifer Adams; Michael Tillman; Chris Taylor; Marjan J. Roos; Robert F. Earhart

    2004-01-27

    The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The partners in this project are Texaco Energy Systems LLC or TES (a subsidiary of ChevronTexaco), General Electric (GE), Praxair, and Kellogg Brown & Root (KBR) in addition to the U.S. Department of Energy (DOE). TES is providing gasification technology and Fischer-Tropsch (F-T) technology developed by Rentech, GE is providing combustion turbine technology, Praxair is providing air separation technology, and KBR is providing engineering. Each of the EECP subsystems was assessed for technical risks and barriers. A plan was developed to mitigate the identified risks (Phase II RD&T Plan, October 2000). The potential technical and economic risks to the EECP from Task 2.5 can be mitigated by demonstrating that the end-use products derived from the upgrading of the F-T synthesis total liquid product can meet or exceed current specifications for the manufacture of ethylene and propylene chemicals from F-T naphtha, for the generation of hydrogen from F-T naphtha to power fuel cells, for direct blending of F-T diesels into transportation fuels, for the conversion of F-T heavy product wax to transportation fuels, and the conversion of F-T Heavy product wax to a valuable high melting point food-grade specialty wax product. Product evaluations conducted under Task 2.5 of Phase II successfully mitigated the above technical and economic risks to the EECP with the development of product yields and product qualities for the production of chemicals, transportation fuels, and specialty food-grade waxes from the F-T synthesis products.

  4. Enterprise Assessments Review, Waste Isolation Pilot Plant -...

    Broader source: Energy.gov (indexed) [DOE]

    for safely operating diesel equipment underground to support ongoing recovery and rehabilitation efforts during significantly restricted underground airflow conditions. The onsite...

  5. ENVIRONMENTAL ASSESSMENT FOR OTEC PILOT PLANTS

    E-Print Network [OSTI]

    Wilde, P.

    2011-01-01

    x o Climatic Thermal Chemical Pollution Biocides o Workingentrainment Climatic/thermal Chemical Pollution Biocides

  6. RISK ASSESSMENT CLOUD COMPUTING

    E-Print Network [OSTI]

    Columbia University

    SECURITY RESEARCH PRIVACY RISK ASSESSMENT AMC DATA FISMA CLOUD COMPUTING MOBILE DEVICES OPERATIONS PRACTICES TRENDS AUDITS policies #12;2 Privacy & Information Security Annual Update Thursday, June 20, 2013 of Breach statistics Plan to comply with requirements · Training and Education Information Security · Risk

  7. Primitive Land Plants 37 PRIMITIVE LAND PLANTS

    E-Print Network [OSTI]

    Koptur, Suzanne

    appeared at this time. Both of these groups of plants had life cycles, involving two generations. One of the year these mosses will produce tiny sporophytes. Prior to this generation, the tiny plants producedPrimitive Land Plants 37 PRIMITIVE LAND PLANTS These are the plants that were present soon after

  8. Handbook of human-reliability analysis with emphasis on nuclear power plant applications. Final report

    SciTech Connect (OSTI)

    Swain, A D; Guttmann, H E

    1983-08-01

    The primary purpose of the Handbook is to present methods, models, and estimated human error probabilities (HEPs) to enable qualified analysts to make quantitative or qualitative assessments of occurrences of human errors in nuclear power plants (NPPs) that affect the availability or operational reliability of engineered safety features and components. The Handbook is intended to provide much of the modeling and information necessary for the performance of human reliability analysis (HRA) as a part of probabilistic risk assessment (PRA) of NPPs. Although not a design guide, a second purpose of the Handbook is to enable the user to recognize error-likely equipment design, plant policies and practices, written procedures, and other human factors problems so that improvements can be considered. The Handbook provides the methodology to identify and quantify the potential for human error in NPP tasks.

  9. Interactive Rapid Dose Assessment Model (IRDAM): reactor-accident assessment methods. Vol. 2

    SciTech Connect (OSTI)

    Poeton, R.W.; Moeller, M.P.; Laughlin, G.J.; Desrosiers, A.E.

    1983-05-01

    As part of the continuing emphasis on emergency preparedness, the US Nuclear Regulatory Commission (NRC) sponsored the development of a rapid dose assessment system by Pacific Northwest Laboratory (PNL). This system, the Interactive Rapid Dose Assessment Model (IRDAM) is a micro-computer based program for rapidly assessing the radiological impact of accidents at nuclear power plants. This document describes the technical bases for IRDAM including methods, models and assumptions used in calculations. IRDAM calculates whole body (5-cm depth) and infant thyroid doses at six fixed downwind distances between 500 and 20,000 meters. Radionuclides considered primarily consist of noble gases and radioiodines. In order to provide a rapid assessment capability consistent with the capacity of the Osborne-1 computer, certain simplifying approximations and assumptions are made. These are described, along with default values (assumptions used in the absence of specific input) in the text of this document. Two companion volumes to this one provide additional information on IRDAM. The user's Guide (NUREG/CR-3012, Volume 1) describes the setup and operation of equipment necessary to run IRDAM. Scenarios for Comparing Dose Assessment Models (NUREG/CR-3012, Volume 3) provides the results of calculations made by IRDAM and other models for specific accident scenarios.

  10. NGNP SITE 2 HAZARDS ASSESSMENT

    SciTech Connect (OSTI)

    Wayne Moe

    2011-10-01

    The Next Generation Nuclear Plant (NGNP) Project initiated at Idaho National Laboratory (INL) by the U.S. Department of Energy pursuant to the 2005 Energy Policy Act, is based on research and development activities supported by the Generation IV Nuclear Energy Systems Initiative. The principal objective of the NGNP Project is to support commercialization of the high temperature gas-cooled reactor (HTGR) technology. The HTGR is a helium-cooled and graphite-moderated reactor that can operate at temperatures much higher than those of conventional light water reactor (LWR) technologies. Accordingly, it can be applied in many industrial applications as a substitute for burning fossil fuels, such as natural gas, to generate process heat in addition to producing electricity, which is the principal application of current LWRs. Nuclear energy in the form of LWRs has been used in the U.S. and internationally principally for the generation of electricity. However, because the HTGR operates at higher temperatures than LWRs, it can be used to displace the use of fossil fuels in many industrial applications. It also provides a carbon emission-free energy supply. For example, the energy needs for the recovery and refining of petroleum, for the petrochemical industry and for production of transportation fuels and feedstocks using coal conversion processes require process heat provided at temperatures approaching 800 C. This temperature range is readily achieved by the HTGR technology. This report summarizes a site assessment authorized by INL under the NGNP Project to determine hazards and potential challenges that site owners and HTGR designers need to be aware of when developing the HTGR design for co-location at industrial facilities, and to evaluate the site for suitability considering certain site characteristics. The objectives of the NGNP site hazard assessments are to do an initial screening of representative sites in order to identify potential challenges and restraints to be addressed in design and licensing processes; assure the HTGR technology can be deployed at variety of sites for a range of applications; evaluate potential sites for potential hazards and describe some of the actions necessary to mitigate impacts of hazards; and, provide key insights that can inform the plant design process. The report presents a summary of the process methodology and the results of an assessment of hazards typical of a class of candidate sites for the potential deployment of HTGR reactor technology. The assessment considered health and safety, and other important siting characteristics to determine the potential impact of identified hazards and potential challenges presented by the location for this technology. A four reactor module nuclear plant (2000 to 2400 MW thermal), that co-generates steam, electricity for general use in the plant, and hot gas for use in a nearby chemical processing facility, to provide the requisite performance and reliability was assumed for the assessment.

  11. Final voluntary release assessment/corrective action report

    SciTech Connect (OSTI)

    NONE

    1996-11-12

    The US Department of Energy, Carlsbad Area Office (DOE-CAO) has completed a voluntary release assessment sampling program at selected Solid Waste Management Units (SWMUs) at the Waste Isolation Pilot Plant (WIPP). This Voluntary Release Assessment/Corrective Action (RA/CA) report has been prepared for final submittal to the Environmental protection Agency (EPA) Region 6, Hazardous Waste Management Division and the New Mexico Environment Department (NMED) Hazardous and Radioactive Materials Bureau to describe the results of voluntary release assessment sampling and proposed corrective actions at the SWMU sites. The Voluntary RA/CA Program is intended to be the first phase in implementing the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) and corrective action process at the WIPP. Data generated as part of this sampling program are intended to update the RCRA Facility Assessment (RFA) for the WIPP (Assessment of Solid Waste Management Units at the Waste Isolation Pilot Plant), NMED/DOE/AIP 94/1. This Final Voluntary RA/CA Report documents the results of release assessment sampling at 11 SWMUs identified in the RFA. With this submittal, DOE formally requests a No Further Action determination for these SWMUs. Additionally, this report provides information to support DOE`s request for No Further Action at the Brinderson and Construction landfill SWMUs, and to support DOE`s request for approval of proposed corrective actions at three other SWMUs (the Badger Unit Drill Pad, the Cotton Baby Drill Pad, and the DOE-1 Drill Pad). This information is provided to document the results of the Voluntary RA/CA activities submitted to the EPA and NMED in August 1995.

  12. DOE/EA-1613: Environmental Assessment for the Proposed High Explosive...

    Office of Environmental Management (EM)

    DOEEA-1613 U.S. DEPARTMENT OF ENERGY ENVIRONMENTAL ASSESSMENT FOR THE PROPOSED HIGH EXPLOSIVE PRESSING FACILITY PANTEX PLANT * AMARILLO, TEXAS * JUNE 2008 Environmental Assessment...

  13. Next Generation Geothermal Power Plants

    SciTech Connect (OSTI)

    Brugman, John; Hattar, Mai; Nichols, Kenneth; Esaki, Yuri

    1995-09-01

    A number of current and prospective power plant concepts were investigated to evaluate their potential to serve as the basis of the next generation geothermal power plant (NGGPP). The NGGPP has been envisaged as a power plant that would be more cost competitive (than current geothermal power plants) with fossil fuel power plants, would efficiently use resources and mitigate the risk of reservoir under-performance, and minimize or eliminate emission of pollutants and consumption of surface and ground water. Power plant concepts were analyzed using resource characteristics at ten different geothermal sites located in the western United States. Concepts were developed into viable power plant processes, capital costs were estimated and levelized busbar costs determined. Thus, the study results should be considered as useful indicators of the commercial viability of the various power plants concepts that were investigated. Broadly, the different power plant concepts that were analyzed in this study fall into the following categories: commercial binary and flash plants, advanced binary plants, advanced flash plants, flash/binary hybrid plants, and fossil/geothed hybrid plants. Commercial binary plants were evaluated using commercial isobutane as a working fluid; both air-cooling and water-cooling were considered. Advanced binary concepts included cycles using synchronous turbine-generators, cycles with metastable expansion, and cycles utilizing mixtures as working fluids. Dual flash steam plants were used as the model for the commercial flash cycle. The following advanced flash concepts were examined: dual flash with rotary separator turbine, dual flash with steam reheater, dual flash with hot water turbine, and subatmospheric flash. Both dual flash and binary cycles were combined with other cycles to develop a number of hybrid cycles: dual flash binary bottoming cycle, dual flash backpressure turbine binary cycle, dual flash gas turbine cycle, and binary gas turbine cycle. Results of this study indicate that dual flash type plants are preferred at resources with temperatures above 400 F. Closed loop (binary type) plants are preferred at resources with temperatures below 400 F. A rotary separator turbine upstream of a dual flash plant can be beneficial at Salton Sea, the hottest resource, or at high temperature resources where there is a significant variance in wellhead pressures from well to well. Full scale demonstration is required to verify cost and performance. Hot water turbines that recover energy from the spent brine in a dual flash cycle improve that cycle's brine efficiency. Prototype field tests of this technology have established its technical feasibility. If natural gas prices remain low, a combustion turbine/binary hybrid is an economic option for the lowest temperature sites. The use of mixed fluids appear to be an attractive low risk option. The synchronous turbine option as prepared by Barber-Nichols is attractive but requires a pilot test to prove cost and performance. Dual flash binary bottoming cycles appear promising provided that scaling of the brine/working fluid exchangers is controllable. Metastable expansion, reheater, Subatmospheric flash, dual flash backpressure turbine, and hot dry rock concepts do not seem to offer any cost advantage over the baseline technologies. If implemented, the next generation geothermal power plant concept may improve brine utilization but is unlikely to reduce the cost of power generation by much more than 10%. Colder resources will benefit more from the development of a next generation geothermal power plant than will hotter resources. All values presented in this study for plant cost and for busbar cost of power are relative numbers intended to allow an objective and meaningful comparison of technologies. The goal of this study is to assess various technologies on an common basis and, secondarily, to give an approximate idea of the current costs of the technologies at actual resource sites. Absolute costs at a given site will be determined by the specifics of a given pr

  14. Portsmouth Gaseous Diffusion Plant Environmental report for 1990

    SciTech Connect (OSTI)

    Counce-Brown, D.

    1991-09-01

    This calendar year 1990 annual report on environmental surveillance of the US Department of Energy's (DOE's) Portsmouth Gaseous Diffusion Plant (PORTS) and its environs consists of two parts: the summary, discussion, and conclusions (Part 1) and the data presentation (Part 2). The objectives of this report are as follows: report 1990 monitoring data for the installation and its environs that may have been affected by operations on the plant site, provide reasonably detailed information about the plant site and plant operations, provide detailed information on input and assumptions used in all calculations, provide trend analyses (when appropriate) to indicate increases and decreases in environmental impact, and provide general information on plant quality assurance.

  15. Assessment Design The unit coordinator is responsible for designing effective, efficient assessment tasks. There are

    E-Print Network [OSTI]

    Mucina, Ladislav

    2 Assessment Design The unit coordinator is responsible for designing effective, efficient tasks for a unit. Constructive alignment A fundamental principle underlying successful learning and contributes to the unit grade/mark. Purpose Assessment for learning Assessment of learning Informs

  16. THE INTRODUCTION OF POTENTIALLY INVASIVE ALIEN PLANT SPECIES FOR HORTICULTURAL

    E-Print Network [OSTI]

    THE INTRODUCTION OF POTENTIALLY INVASIVE ALIEN PLANT SPECIES FOR HORTICULTURAL PURPOSES IN NORTH: The Introduction of Potentially Invasive Alien Plant Species for Horticultural Purposes in North America: Assessing/Approved: ________________________________________ #12;iii ABSTRACT Invasive alien plant species are known to cause significant economic and ecological

  17. Sabotage at Nuclear Power Plants

    SciTech Connect (OSTI)

    Purvis, James W.

    1999-07-21

    Recently there has been a noted worldwide increase in violent actions including attempted sabotage at nuclear power plants. Several organizations, such as the International Atomic Energy Agency and the US Nuclear Regulatory Commission, have guidelines, recommendations, and formal threat- and risk-assessment processes for the protection of nuclear assets. Other examples are the former Defense Special Weapons Agency, which used a risk-assessment model to evaluate force-protection security requirements for terrorist incidents at DOD military bases. The US DOE uses a graded approach to protect its assets based on risk and vulnerability assessments. The Federal Aviation Administration and Federal Bureau of Investigation conduct joint threat and vulnerability assessments on high-risk US airports. Several private companies under contract to government agencies use formal risk-assessment models and methods to identify security requirements. The purpose of this paper is to survey these methods and present an overview of all potential types of sabotage at nuclear power plants. The paper discusses emerging threats and current methods of choice for sabotage--especially vehicle bombs and chemical attacks. Potential consequences of sabotage acts, including economic and political; not just those that may result in unacceptable radiological exposure to the public, are also discussed. Applicability of risk-assessment methods and mitigation techniques are also presented.

  18. Waste Isolation Pilot Plant Safety Analysis Report

    SciTech Connect (OSTI)

    1995-11-01

    The following provides a summary of the specific issues addressed in this FY-95 Annual Update as they relate to the CH TRU safety bases: Executive Summary; Site Characteristics; Principal Design and Safety Criteria; Facility Design and Operation; Hazards and Accident Analysis; Derivation of Technical Safety Requirements; Radiological and Hazardous Material Protection; Institutional Programs; Quality Assurance; and Decontamination and Decommissioning. The System Design Descriptions`` (SDDS) for the WIPP were reviewed and incorporated into Chapter 3, Principal Design and Safety Criteria and Chapter 4, Facility Design and Operation. This provides the most currently available final engineering design information on waste emplacement operations throughout the disposal phase up to the point of permanent closure. Also, the criteria which define the TRU waste to be accepted for disposal at the WIPP facility were summarized in Chapter 3 based on the WAC for the Waste Isolation Pilot Plant.`` This Safety Analysis Report (SAR) documents the safety analyses that develop and evaluate the adequacy of the Waste Isolation Pilot Plant Contact-Handled Transuranic Wastes (WIPP CH TRU) safety bases necessary to ensure the safety of workers, the public and the environment from the hazards posed by WIPP waste handling and emplacement operations during the disposal phase and hazards associated with the decommissioning and decontamination phase. The analyses of the hazards associated with the long-term (10,000 year) disposal of TRU and TRU mixed waste, and demonstration of compliance with the requirements of 40 CFR 191, Subpart B and 40 CFR 268.6 will be addressed in detail in the WIPP Final Certification Application scheduled for submittal in October 1996 (40 CFR 191) and the No-Migration Variance Petition (40 CFR 268.6) scheduled for submittal in June 1996. Section 5.4, Long-Term Waste Isolation Assessment summarizes the current status of the assessment.

  19. RNA silencing in plants: Flash report!

    E-Print Network [OSTI]

    Mosher, Rebecca A; Lewsey, Mathew G; Shivaprasad, Padubidri V

    2010-06-30

    different nutrient conditions. Several Department of Plant Sciences, University of Cambridge, Cambridge, CB2 3EA, UK Full list of author information is available at the end of the article Mosher et al. Silence 2010, 1:13 http... Department of Plant Sciences, University of Cambridge, Cambridge, CB2 3EA, UK and 2Plant Biology Laboratory, The Salk Institute for Biological Studies, La Jolla, CA 92037, USA References 1. Fire A, Xu S, Montgomery MK, Kostas SA, Driver SE, Mello CC: Potent...

  20. Landscape Plants: Fertilizing & Watering

    E-Print Network [OSTI]

    Ishida, Yuko

    Landscape Plants: Fertilizing & Watering Landscape Plants: Fertilizing & Watering Prevent runoff and shrubs, either through directly killing plants or making them more prone to disease. Fertilizer runoff into storm drains pollutes waterways. Maintain plant health and protect water quality by fertilizing

  1. Plants & Animals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformationJesseworkSURVEYI/OPerformancePi Day Pi Day Pi Day isPlanning forPlants &

  2. Rangeland Risk Management for Texans: Toxic Plants 

    E-Print Network [OSTI]

    Hart, Charles R.

    2000-11-01

    Toxic plants can cause serious losses to livestock, but with the information in this leaflet producers will know how to manage grazing to minimize the danger of toxic plants. It is important to recognize problems early and know how to deal with them....

  3. Lessons learned from existing biomass power plants

    SciTech Connect (OSTI)

    Wiltsee, G.

    2000-02-24

    This report includes summary information on 20 biomass power plants, which represent some of the leaders in the industry. In each category an effort is made to identify plants that illustrate particular points. The project experiences described capture some important lessons learned that lead in the direction of an improved biomass power industry.

  4. Utility of Social Modeling for Proliferation Assessment - Preliminary Assessment

    SciTech Connect (OSTI)

    Coles, Garill A.; Gastelum, Zoe N.; Brothers, Alan J.; Thompson, Sandra E.

    2009-06-01

    This Preliminary Assessment draft report will present the results of a literature search and preliminary assessment of the body of research, analysis methods, models and data deemed to be relevant to the Utility of Social Modeling for Proliferation Assessment research. This report will provide: 1) a description of the problem space and the kinds of information pertinent to the problem space, 2) a discussion of key relevant or representative literature, 3) a discussion of models and modeling approaches judged to be potentially useful to the research, and 4) the next steps of this research that will be pursued based on this preliminary assessment. This draft report represents a technical deliverable for the NA-22 Simulations, Algorithms, and Modeling (SAM) program. Specifically this draft report is the Task 1 deliverable for project PL09-UtilSocial-PD06, Utility of Social Modeling for Proliferation Assessment. This project investigates non-traditional use of social and cultural information to improve nuclear proliferation assessment, including nonproliferation assessment, proliferation resistance assessments, safeguards assessments and other related studies. These assessments often use and create technical information about the State’s posture towards proliferation, the vulnerability of a nuclear energy system to an undesired event, and the effectiveness of safeguards. This project will find and fuse social and technical information by explicitly considering the role of cultural, social and behavioral factors relevant to proliferation. The aim of this research is to describe and demonstrate if and how social science modeling has utility in proliferation assessment.

  5. Ocean Thermal Energy Conversion Life Cycle Cost Assessment, Final Technical Report, 30 May 2012

    SciTech Connect (OSTI)

    Martel, Laura; Smith, Paul; Rizea, Steven; Van Ryzin, Joe; Morgan, Charles; Noland, Gary; Pavlosky, Rick; Thomas, Michael

    2012-06-30

    The Ocean Thermal Energy Conversion (OTEC) Life Cycle Cost Assessment (OLCCA) is a study performed by members of the Lockheed Martin (LM) OTEC Team under funding from the Department of Energy (DOE), Award No. DE-EE0002663, dated 01/01/2010. OLCCA objectives are to estimate procurement, operations and maintenance, and overhaul costs for two types of OTEC plants: -Plants moored to the sea floor where the electricity produced by the OTEC plant is directly connected to the grid ashore via a marine power cable (Grid Connected OTEC plants) -Open-ocean grazing OTEC plant-ships producing an energy carrier that is transported to designated ports (Energy Carrier OTEC plants) Costs are developed using the concept of levelized cost of energy established by DOE for use in comparing electricity costs from various generating systems. One area of system costs that had not been developed in detail prior to this analysis was the operations and sustainment (O&S) cost for both types of OTEC plants. Procurement costs, generally referred to as capital expense and O&S costs (operations and maintenance (O&M) costs plus overhaul and replacement costs), are assessed over the 30 year operational life of the plants and an annual annuity calculated to achieve a levelized cost (constant across entire plant life). Dividing this levelized cost by the average annual energy production results in a levelized cost of electricity, or LCOE, for the OTEC plants. Technical and production efficiency enhancements that could result in a lower value of the OTEC LCOE were also explored. The thermal OTEC resource for Oahu, Hawai�¢����i and projected build out plan were developed. The estimate of the OTEC resource and LCOE values for the planned OTEC systems enable this information to be displayed as energy supplied versus levelized cost of the supplied energy; this curve is referred to as an Energy Supply Curve. The Oahu Energy Supply Curve represents initial OTEC deployment starting in 2018 and demonstrates the predicted economies of scale as technology and efficiency improvements are realized and larger more economical plants deployed. Utilizing global high resolution OTEC resource assessment from the Ocean Thermal Extractable Energy Visualization (OTEEV) project (an independent DOE project), Global Energy Supply Curves were generated for Grid Connected and Energy Carrier OTEC plants deployed in 2045 when the predicted technology and efficiencies improvements are fully realized. The Global Energy Supply Curves present the LCOE versus capacity in ascending order with the richest, lowest cost resource locations being harvested first. These curves demonstrate the vast ocean thermal resource and potential OTEC capacity that can be harvested with little change in LCOE.

  6. Next Generation Nuclear Plant Phenomena Identification and Ranking Tables (PIRTs) Volume 6: Process Heat and Hydrogen Co-Generation PIRTs

    SciTech Connect (OSTI)

    Forsberg, Charles W; Gorensek, M. B.; Herring, S.; Pickard, P.

    2008-03-01

    A Phenomena Identification and Ranking Table (PIRT) exercise was conducted to identify potential safety-0-related physical phenomena for the Next Generation Nuclear Plant (NGNP) when coupled to a hydrogen production or similar chemical plant. The NGNP is a very high-temperature reactor (VHTR) with the design goal to produce high-temperature heat and electricity for nearby chemical plants. Because high-temperature heat can only be transported limited distances, the two plants will be close to each other. One of the primary applications for the VHTR would be to supply heat and electricity for the production of hydrogen. There was no assessment of chemical plant safety challenges. The primary application of this PIRT is to support the safety analysis of the NGNP coupled one or more small hydrogen production pilot plants. However, the chemical plant processes to be coupled to the NGNP have not yet been chosen; thus, a broad PIRT assessment was conducted to scope alternative potential applications and test facilities associated with the NGNP. The hazards associated with various chemicals and methods to minimize risks from those hazards are well understood within the chemical industry. Much but not all of the information required to assure safe conditions (separation distance, relative elevation, berms) is known for a reactor coupled to a chemical plant. There is also some experience with nuclear plants in several countries that have produced steam for industrial applications. The specific characteristics of the chemical plant, site layout, and the maximum stored inventories of chemicals can provide the starting point for the safety assessments. While the panel identified events and phenomena of safety significance, there is one added caveat. Multiple high-temperature reactors provide safety-related experience and understanding of reactor safety. In contrast, there have been only limited safety studies of coupled chemical and nuclear plants. The work herein provides a starting point for those studies; but, the general level of understanding of safety in coupling nuclear and chemical plants is less than in other areas of high-temperature reactor safety.

  7. Deming Solar Plant Solar Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTIONRobertsdale, Alabama (UtilityInstruments IncMississippi:Delta Electric Power AssnDelugeDemarest,

  8. Saguargo Solar Power Plant Solar Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onRAPID/Geothermal/Exploration/ColoradoRemsenburg-Speonk,Sage Resources Jump to: navigation, searchSaguache

  9. Solana Generating Plant Solar Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LIST OFAMERICA'SHeavyAgencyTendo New Energy Equipment Co LtdSimranSkykon ASohamSolana

  10. Prescott Airport Solar Plant Solar Power Plant | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIXsourceII JumpQuarterly SmartDB-2, BluePoulsen Hybrid,Areas- CovePrescience

  11. Level 3 Baseline Risk Assessment for Building 3515 at Oak Ridge National Lab., Oak Ridge, TN

    SciTech Connect (OSTI)

    Wollert, D.A.; Cretella, F.M.; Golden, K.M.

    1995-08-01

    The baseline risk assessment for the Fission Product Pilot Plant (Building 3515) at the Oak Ridge National laboratory (ORNL) provides the Decontamination and Decommissioning (D&D) Program at ORNL and Building 3515 project managers with information concerning the results of the Level 3 baseline risk assessment performed for this building. The document was prepared under Work Breakdown Structure 1.4.12.6.2.01 (Activity Data Sheet 3701, Facilities D&D) and includes information on the potential long-term impacts to human health and the environment if no action is taken to remediate Building 3515. Information provided in this document forms the basis for the development of remedial alternatives and the no-action risk portion of the Engineering Evaluation/Cost Analysis report.

  12. Enterprise Assessments Review of the Hanford Site Waste Treatment...

    Office of Environmental Management (EM)

    Office of Enterprise Assessments Review of the Hanford Site Waste Treatment and Immobilization Plant Construction Quality June 2015 Office of Nuclear Safety and Environmental...

  13. Office of Enterprise Assessments Review of the Waste Isolation...

    Office of Environmental Management (EM)

    Review of the Waste Isolation Pilot Plant Conduct of Maintenance Recovery Plan December 2014 Office of Nuclear Safety and Environmental Assessments Office of Environment, Safety...

  14. Feasibility Assessment of the Water Energy Resources of the United...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment of the Water Energy Resources of the United States for New Low Power and Small Hydro Classes of Hydroelectric Plants: Main Report and Appendix A Feasibility...

  15. Enterprise Assessments Review of the Hanford Site Waste Treatment...

    Office of Environmental Management (EM)

    Hazards Analysis Report for the Low-Activity Waste Facility Reagent Systems - July 2015 Enterprise Assessments Review of the Hanford Site Waste Treatment and Immobilization Plant...

  16. Enterprise Assessments Operational Awareness Record for the Review...

    Office of Environmental Management (EM)

    Hanford Site Waste Treatment and Immobilization Plant Low-Activity Facility Wide Draft Hazard Analysis Report - June 2015 Enterprise Assessments Operational Awareness Record for...

  17. Enterprise Assessments Review of the Hanford Site Waste Treatment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Engineering Processes - October 2015 Enterprise Assessments Review of the Hanford Site Waste Treatment and Immobilization Plant Project Engineering Processes - October 2015...

  18. Enterprise Assessments Review of the Hanford Waste Treatement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste Treatement and Immobilization Plant Construction Quality (conducted in December 2014) - June 2015 Enterprise Assessments Review of the Hanford Waste Treatement and...

  19. Plant Operational Status - Pantex Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefieldSulfateSciTechtail.Theory ofDid youOxygen Generation | Center for GasPhysics Physics PrintPicturePlant

  20. EARLY ENTRANCE COPRODUCTION PLANT

    SciTech Connect (OSTI)

    Randy Roberts

    2003-04-25

    The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which produces at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using petroleum coke and ChevronTexaco's proprietary gasification technology. The objective of Phase I was to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The partners in this project are Texaco Energy Systems LLC. (a subsidiary of ChevronTexaco), General Electric (GE), Praxair, and Kellogg Brown & Root (KBR) in addition to the U.S. Department of Energy (DOE). ChevronTexaco is providing gasification technology and Fischer-Tropsch technology developed by Rentech, GE is providing combustion turbine technology, Praxair is providing air separation technology and KBR is providing engineering. Each of the EECP subsystems were assessed for technical risks and barriers. A plan was identified to mitigate the identified risks (Phase II RD&T Plan, October 2000). The RD&T Plan identified F-T reactor scale-up as a potential technical risk. The objective of Task 2.3 was to confirm engineering models that allow scale-up to commercial slurry phase bubble column (SPBC) reactors operating in the churn-turbulent flow regime. In developmental work outside the scope of this project, historical data, literature references, and a scale-up from a 1 1/2-in. (3.8 cm) to 6-ft (1.8 m) SPBC reactor have been reviewed. This review formed the background for developing scale-up models for a SPBC reactor operating in the churn-turbulent flow regime. The necessary fundamental physical parameters have been measured and incorporated into the mathematical catalyst/kinetic model developed from the SPBC and CSTR work outside the scope of this EECP project. The mathematical catalyst/kinetic model was used to compare to experimental data obtained at Rentech during the EECP Fischer-Tropsch Confirmation Run (Task 2.1; reported separately). The prediction of carbon monoxide (CO) conversion as a function of days on stream compares quite closely to the experimental data.