Idaho National Engineering Laboratory (INEL) Environmental Restoration (ER) Program Baseline Safety Analysis File (BSAF)  

Science Conference Proceedings (OSTI)

The Baseline Safety Analysis File (BSAF) is a facility safety reference document for the Idaho National Engineering Laboratory (INEL) environmental restoration activities. The BSAF contains information and guidance for safety analysis documentation required by the U.S. Department of Energy (DOE) for environmental restoration (ER) activities, including: Characterization of potentially contaminated sites. Remedial investigations to identify and remedial actions to clean up existing and potential releases from inactive waste sites Decontamination and dismantlement of surplus facilities. The information is INEL-specific and is in the format required by DOE-EM-STD-3009-94, Preparation Guide for U.S. Department of Energy Nonreactor Nuclear Facility Safety Analysis Reports. An author of safety analysis documentation need only write information concerning that activity and refer to BSAF for further information or copy applicable chapters and sections. The information and guidance provided are suitable for: {sm_bullet} Nuclear facilities (DOE Order 5480-23, Nuclear Safety Analysis Reports) with hazards that meet the Category 3 threshold (DOE-STD-1027-92, Hazard Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports) {sm_bullet} Radiological facilities (DOE-EM-STD-5502-94, Hazard Baseline Documentation) Nonnuclear facilities (DOE-EM-STD-5502-94) that are classified as {open_quotes}low{close_quotes} hazard facilities (DOE Order 5481.1B, Safety Analysis and Review System). Additionally, the BSAF could be used as an information source for Health and Safety Plans and for Safety Analysis Reports (SARs) for nuclear facilities with hazards equal to or greater than the Category 2 thresholds, or for nonnuclear facilities with {open_quotes}moderate{close_quotes} or {open_quotes}high{close_quotes} hazard classifications.

NONE

1995-09-01T23:59:59.000Z

2

EIS-0203F; DOE Programmatic Spent Nuclear Fuel Management and INEL Environmental Restoration and Waste Management Programs Final Environmental Impact Statement  

NLE Websites -- All DOE Office Websites (Extended Search)

02-1995/voli.html[6/27/2011 12:23:34 PM] 02-1995/voli.html[6/27/2011 12:23:34 PM] DOE Programmatic Spent Nuclear Fuel Management and INEL Environmental Restoration and Waste Management Programs Final Environmental Impact Statement VOLUME II VOLUME II Part A COVER SHEET RESPONSIBLE AGENCIES: Lead Federal Agency: U.S. Department of Energy Cooperating Federal Agency: U.S. Department of the Navy TITLE: Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final Environmental Impact Statement. CONTACT: For further information on this Environmental Impact Statement call or contact: DOE Idaho Operations Office Bradley P. Bugger Office of Communications 850 Energy Drive, MS 1214 Idaho Falls, ID 83403-3189

3

EIS-0203F; DOE Programmatic Spent Nuclear Fuel Management and INEL Environmental Restoration and Waste Management Programs Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

02-1995/voli.html[6/27/2011 12:23:34 PM] 02-1995/voli.html[6/27/2011 12:23:34 PM] DOE Programmatic Spent Nuclear Fuel Management and INEL Environmental Restoration and Waste Management Programs Final Environmental Impact Statement VOLUME II VOLUME II Part A COVER SHEET RESPONSIBLE AGENCIES: Lead Federal Agency: U.S. Department of Energy Cooperating Federal Agency: U.S. Department of the Navy TITLE: Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final Environmental Impact Statement. CONTACT: For further information on this Environmental Impact Statement call or contact: DOE Idaho Operations Office Bradley P. Bugger Office of Communications 850 Energy Drive, MS 1214 Idaho Falls, ID 83403-3189

4

Data management for environmental restoration  

SciTech Connect

The mission for data management for the Environmental Restoration Department (ERD) at the Idaho National Engineering Laboratory (INEL), is to deliver quality assured data for decision making. Data management must meet regulatory requirements by developing appropriate technical capabilities. This paper describes the requirements and how they are being met at the INEL.

Yurman, D.J.

1992-08-01T23:59:59.000Z

5

Data management for environmental restoration  

SciTech Connect

The mission for data management for the Environmental Restoration Department (ERD) at the Idaho National Engineering Laboratory (INEL), is to deliver quality assured data for decision making. Data management must meet regulatory requirements by developing appropriate technical capabilities. This paper describes the requirements and how they are being met at the INEL.

Yurman, D.J.

1992-01-01T23:59:59.000Z

6

EIS-0203F; DOE Programmatic Spent Nuclear Fuel Management and INEL Environmental Restoration and Waste Management Programs Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary-1995.html[6/27/2011 12:08:32 PM] Summary-1995.html[6/27/2011 12:08:32 PM] SUMMARY DOE/EIS-0203-F Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final Environmental Impact Statement Summary April 1995 U.S. Department of Energy Office of Environmental Management Idaho Operations Office Department of Energy Washington, DC 20585 April 1995 Dear Citizen: This is a summary of the Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final Environmental Impact Statement. The Department of Energy and

7

INEL Geothermal Environmental Program. Final environmental report  

DOE Green Energy (OSTI)

An overview of environmental monitoring programs and research during development of a moderate temperature geothermal resource in the Raft River Valley is presented. One of the major objectives was to develop programs for environmental assessment and protection that could serve as an example for similar types of development. The monitoring studies were designed to establish baseline conditions (predevelopment) of the physical, biological, and human environment. Potential changes were assessed and adverse environmental impacts minimized. No major environmental impacts resulted from development of the Raft River Geothermal Research Facility. The results of the physical, biological, and human environment monitoring programs are summarized.

Thurow, T.L.; Cahn, L.S.

1982-09-01T23:59:59.000Z

8

INEL Geothermal Environmental Program. 1979 annual report  

DOE Green Energy (OSTI)

The Raft River Geothermal Environmental Program is designed to assess beneficial and detrimental impacts to the ecosystem resulting from the development of moderate temperature geothermal resources in the valley. The results of this research contribute to developing an understanding of Raft River Valley ecology and provide a basis for making management decisions to reduce potential long-term detrimental impacts on the environment. The environmental monitoring and research efforts conducted during the past six years of geothermal development and planned future research are summarized.

Thurow, T.L.; Sullivan, J.F.

1980-04-01T23:59:59.000Z

9

INEL geothermal environmental program. 1980 annual report  

DOE Green Energy (OSTI)

An overview of continuing environmental research and monitoring programs conducted at the Raft River Geothermal Site is provided. The monitoring programs are designed to collect data on the physical, biological and human environments of the development area. Primary research during 1980 emphasized completing baseline studies on terrestrial fauna, establishing an air quality monitoring network, investigating potential sources of fluoride in the Raft River Valley, and studying water level changes in the shallow monitor wells in response to development of the geothermal resource.

Cahn, L.S.; Thurow, T.L.; Martinez, J.A.

1981-04-01T23:59:59.000Z

10

1978 annual report, INEL geothermal environmental program  

DOE Green Energy (OSTI)

The objective of the Raft River Geothermal Environmental Program, in its fifth year, is to characterize the beneficial and detrimental impacts resulting from the development of moderate-temperature geothermal resources in the valley. This report summarizes the monitoring and research efforts conducted as part of this program in 1978. The results of these monitoring programs will be used to determine the mitigation efforts required to reduce long-term impacts resulting from geothermal development.

Spencer, S.G.; Sullivan, J.F.; Stanley, N.E.

1979-04-01T23:59:59.000Z

11

1994 INEL site-specific plan  

Science Conference Proceedings (OSTI)

This report presents plans for environmental restoration and waste management activities at the Idaho National Engineering Laboratory for fiscal year 1994. This years`s plan focuses on issues affecting the Environmental Restoration and Waste Management Programs. The Environmental Restoration Program is concerned with all aspects of assessment and cleanup of inactive operations. It involves assessing and cleaning up (where necessary) inactive INEL waste areas that could release harmful substances into the environment, as well as safely managing surplus nuclear facilities. The Waste Management program involves treatment, storage, and disposal of radioactive, hazardous, mixed, and industrial waste by DOE activities. This program is designed to protect the safety of INEL employees, the public, and the environment in the design, construction, maintenance, and operation of INEL treatment, storage, and disposal facilities. It operates facilities in a cost-effective, environmentally sound, regulatory compliant, and publicly acceptable manner.

Couch, B.

1994-05-01T23:59:59.000Z

12

MOUND Environmental Restoration Program  

Office of Legacy Management (LM)

MOUND MOUND Environmental Restoration Program ._. I s ! I " ' Al /. i i : MOUND Environmental Restoration Program VlOUND I MOUND PLANT POTENTIAL RELEASE SITE PACKAGE Notice of Public Review Period hgram The following potential release site (PRS) packages will be available for public review ir he CERCLA Public Reading Room, 305 E. Central Ave., Miamisburg, Ohio beginning lune 17, 1997. Public comment will be accepted on these packages from June 17, 1997, .hrough July 18, 1997. PRS 30: Building 27 Propane Tank PRS 129/130: Former Solvent Storage Sites PRS 241: Soil Con@mination- - Main Hill Parking Lot Area PRS 307: Soil Contamination -.Buil.ding 29 PRS 318: PCB Tramformer and Capacitor Locations PRS 320-325: Former Sites -:Dayton Uqits 1-4/Dayton WarehousYScioto Facility

13

FAQS Reference Guide Environmental Restoration  

Energy.gov (U.S. Department of Energy (DOE))

This reference guide addresses the competency statements in the November 2002 edition of DOE-STD-1157-2002, Environmental Restoration Functional Area Qualification Standard.

14

Environmental Restoration and Waste Management Site-Specific Plan for Fiscal Year 1993  

SciTech Connect

The Idaho National Engineering Laboratory (INEL) is a US Department of Energy (DOE) multiprogram laboratory whose primary mission has been to research nuclear technologies. Working with these technologies and conducting other types of research generates waste, including radioactive and/or hazardous wastes. While most of the waste treatment, storage, and disposal practices have been effective, some practices have led to the release of contaminants to the environment. As a result, DOE has developed (1) an Environmental Restoration (ER) Program to identify and, where necessary, cleanup releases from inactive waste sites and (2) a Waste Management (WM) Program to safely treat, store, and dispose of DOE wastes generated from current and future activities in an environmentally sound manner. This document describes the plans for FY 1993 for the INEL`s ER and WM programs as managed by DOE`s Idaho Field Office (DOE-ID).

1993-03-01T23:59:59.000Z

15

Environmental Restoration Quality Program Plan. Environmental Restoration Program  

Science Conference Proceedings (OSTI)

The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program was initially chartered on October 1, 1989, as a ``entral Environmental Restoration Division`` to manage the investigation and remediation of inactive sites and facilities that have been declared surplus and have no further programmatic use. The Energy Systems ER Division was established to support the DOE Oak Ridge Field Office (DOE-OR) consolidated ER Program. The DOE-OR Assistant Manager for Environmental Restoration and Waste Management provides program and budget direction to the Energy Systems ER Program for environmental restoration activities at the sites operated by Energy Systems (Oak Ridge K-25 Site, Oak Ridge National Laboratory, Oak Ridge Y-12 Plant, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant) and at the off-site locations. The Energy Systems ER Division is specifically charged with assessing these sites for potential contamination and managing the cleanup processes. The Energy Systems Environmental Restoration Division was chartered on October 1, 1989, as a central organization to manage the Remedial Action (RA) Program. The purpose of this document is to ensure that: senior ER management provides planning, organization, direction, control, and support to achieve the organization`s objectives; the line organization achieves quality; and overall performance is reviewed and evaluated using a rigorous assessment process.

Colley, J.S.

1992-08-01T23:59:59.000Z

16

Supplemental investigations in support of environmental assessments by the Idaho INEL Oversight Program at the Idaho National Engineering Laboratory  

SciTech Connect

This document reports on the status of supplemental investigations in support of environmental assessments by the Idaho INEL Oversight Program at the Idaho National Engineering Laboratory. Included is information on hydrology studies in wells open through large intervals, unsaturated zone contamination and transport processes, surface water-groundwater interactions, regional groundwater flow, and independent testing of air quality data.

1992-01-01T23:59:59.000Z

17

Environmental Restoration Strategic Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategic Plan Environmental Restoration Strategic Plan, remediating the Nuclear Weapons Complex, August 1995, environmentalrestorationstrategicplan.pdf Environmental...

18

Environmental Restoration Quality Program Plan  

Science Conference Proceedings (OSTI)

The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program was initially chartered on October 1, 1989, as a entral Environmental Restoration Division'' to manage the investigation and remediation of inactive sites and facilities that have been declared surplus and have no further programmatic use. The Energy Systems ER Division was established to support the DOE Oak Ridge Field Office (DOE-OR) consolidated ER Program. The DOE-OR Assistant Manager for Environmental Restoration and Waste Management provides program and budget direction to the Energy Systems ER Program for environmental restoration activities at the sites operated by Energy Systems (Oak Ridge K-25 Site, Oak Ridge National Laboratory, Oak Ridge Y-12 Plant, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant) and at the off-site locations. The Energy Systems ER Division is specifically charged with assessing these sites for potential contamination and managing the cleanup processes. The Energy Systems Environmental Restoration Division was chartered on October 1, 1989, as a central organization to manage the Remedial Action (RA) Program. The purpose of this document is to ensure that: senior ER management provides planning, organization, direction, control, and support to achieve the organization's objectives; the line organization achieves quality; and overall performance is reviewed and evaluated using a rigorous assessment process.

Colley, J.S.

1992-08-01T23:59:59.000Z

19

Environmental Restoration Quality Program Implementation Plan. Environmental Restoration Program  

SciTech Connect

The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

1992-08-01T23:59:59.000Z

20

Ecological risks of DOE`s programmatic environmental restoration alternatives  

SciTech Connect

This report assesses the ecological risks of the Department of Energy`s (DOE) Environmental Restoration Program. The assessment is programmatic in that it is directed at evaluation of the broad programmatic alternatives outlined in the DOE Implementation Plan. It attempts to (1) characterize the ecological resources present on DOE facilities, (2) describe the occurrence and importance of ecologically significant contamination at major DOE facilities, (3) evaluate the adverse ecological impacts of habitat disturbance caused by remedial activities, and (4) determine whether one or another of the programmatic alternatives is clearly ecologically superior to the others. The assessment focuses on six representative facilities: the Idaho National Engineering Laboratory (INEL); the Fernald Environmental Management Project (FEMP); the Oak Ridge Reservation (ORR), including the Oak Ridge National Laboratory (ORNL), Y-12 plant, and K-25 plant; the Rocky Flats Plant; the Hanford Reservation; and the Portsmouth Gaseous Diffusion Plant.

Not Available

1994-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "inel environmental restoration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Environmental Security and Restoration [EVS Program Area]  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Security and Restoration Environmental Security and Restoration EVS focuses on environmental and human health aspects of homeland and national security, as well as restoration of sites contaminated with hazardous materials. Contamination in our environment - in air, water, and soil - contributes to health problems and affects the quality of our lives. The EVS Division confronts this challenge by addressing environmental and human health aspects of homeland and national security and by characterizing and restoring sites contaminated with hazardous materials. We integrate extensive expertise in engineering, health physics, hydrogeology, environmental science, chemistry, spatial analysis, database management, and computer programming to contribute to environmental security and restoration.

22

FAQS Qualification Card - Environmental Restoration | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Restoration Environmental Restoration FAQS Qualification Card - Environmental Restoration A key element for the Department's Technical Qualification Programs is a set of common Functional Area Qualification Standards (FAQS) and associated Job Task Analyses (JTA). These standards are developed for various functional areas of responsibility in the Department, including oversight of safety management programs identified as hazard controls in Documented Safety Analyses (DSA). For each functional area, the FAQS identify the minimum technical competencies and supporting knowledge and skills for a typical qualified individual working in the area. FAQC-EnvironmentalRestoration.docx Description Environmental Restoration Qualification Card More Documents & Publications FAQS Qualification Card - General Technical Base

23

Environmental Security and Restoration | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Security & Restoration Environmental Security & Restoration Argonne's work in environmental security and restoration addresses soil, surface water, sediment, and groundwater at contaminated sites. Argonne's work in environmental restoration addresses soil, surface water, sediment, and groundwater at contaminated sites, starting with environmental evaluations and planning projects. Assessments are also conducted of approaches for long-term stewardship of remediated sites with residual contamination. Remedies range from precise excavations to innovative combinations of engineered wetlands and phytoremediation. Argonne researchers conduct approaches for long-term stewardship of remediated sites with residual contamination. The objective of environmental security programs is to support efforts to reduce national

24

DOE/EIS-0203-SA-01; Supplement Analysis of the INEEL Portion of the April 1995 Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations Office 850 Energy Drive Idaho Falls, Idaho 83401-1563 November 2002 SUBJECT: Conclusions of the Supplement Analysis of the DOE Programmatic Spent Nuclear Fuel Management and INEL Environmental Restoration and Waste Management Programs EIS (1995 EIS) ~ Dear Citizen: The Record of Decision (ROD) for the DOE Programmatic Spent Nuclear Fuel Management and INEL Environmental Restoration and Waste Management Programs EIS (1995 EIS) left several decisions concerning INEEL proposed actions outstanding. That is, decisions were deferred .pending further project definition, funding priorities, or appropriate review under NEPA" In May 2000 a team of DOE-ID program representatives and subject area technical specialists (interdisciplinary

25

Small Business Issues for Environmental Restoration Acquisitions  

Energy.gov (U.S. Department of Energy (DOE))

Small Business Issues for Environmental Restoration Acquisitions The Department of Energys best practices to reduce and eliminate barriers to small businesses entering into prime contracts for...

26

Groundwater Projects, Environmental Restoration Division, ERD...  

NLE Websites -- All DOE Office Websites (Extended Search)

OU I, IV, V, and VI also address groundwater contamination. The BNL Groundwater Status Report is an annual comprehensive summary of data collected from environmental restoration...

27

EA-507; Environmental Assessment and FONSI For The FAA Explosive Detection System Independent Validation And Verification Program INEL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

07; Environmental Assessment and FONSI For The FAA Explosive 07; Environmental Assessment and FONSI For The FAA Explosive Detection System Independent Validation And Verification Program INEL Table of Contents 1. NEED FOR PROPOSED ACTION 2. DESCRIPTION OF THE PROPOSED ACTION 3. ALTERNATIVES TO PROPOSED ACTION 4. ENVIRONMENTAL IMPACTS OF PROPOSED ACTION 5. CONCLUSIONS/SUMMARY 6. LIST OF PREPARERS 7. REFERENCES APPENDIX I Map of WRRTF APPENDIX II Accident Safety Analysis FINDING OF NO SIGNIFICANT IMPACT FEDERAL AVIATION ADMINISTRATION EXPLOSIVE DETECTION SYSTEM - INDEPENDENT VALIDATION AND VERIFICATION PROGRAM LIST OF FIGURES Page XXX WATER REACTOR RESEARCH TEST FACT 1. NEED FOR PROPOSED ACTION The urgent development, fabrication, and operation of advanced explosive detection systems are needed by the Federal Aviation Agency (FAA) to

28

Supplemental investigations in support of environmental assessments by the Idaho INEL Oversight Program at the Idaho National Engineering Laboratory. Status report, June 30, 1992  

SciTech Connect

This document reports on the status of supplemental investigations in support of environmental assessments by the Idaho INEL Oversight Program at the Idaho National Engineering Laboratory. Included is information on hydrology studies in wells open through large intervals, unsaturated zone contamination and transport processes, surface water-groundwater interactions, regional groundwater flow, and independent testing of air quality data.

1992-11-01T23:59:59.000Z

29

Environmental Restoration Program Management Control Plan  

SciTech Connect

This Management Control Plan has been prepared to define the Energy Systems approach to managing its participation in the US DOE's Environmental Restoration (ER) Program in a manner consistent with DOE/ORO 931: Management Plan for the DOE Field Office, Oak Ridge, Decontamination and Decommissioning Program; and the Energy Systems Environmental Restoration Contract Management Plan (CMP). This plan discusses the systems, procedures, methodology, and controls to be used by the program management team to attain these objectives.

1991-09-01T23:59:59.000Z

30

Environmental Restoration Information Resource Management Program Plan  

SciTech Connect

The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

Not Available

1994-09-01T23:59:59.000Z

31

Cost Estimating Handbook for Environmental Restoration  

Science Conference Proceedings (OSTI)

Environmental restoration (ER) projects have presented the DOE and cost estimators with a number of properties that are not comparable to the normal estimating climate within DOE. These properties include: An entirely new set of specialized expressions and terminology. A higher than normal exposure to cost and schedule risk, as compared to most other DOE projects, due to changing regulations, public involvement, resource shortages, and scope of work. A higher than normal percentage of indirect costs to the total estimated cost due primarily to record keeping, special training, liability, and indemnification. More than one estimate for a project, particularly in the assessment phase, in order to provide input into the evaluation of alternatives for the cleanup action. While some aspects of existing guidance for cost estimators will be applicable to environmental restoration projects, some components of the present guidelines will have to be modified to reflect the unique elements of these projects. The purpose of this Handbook is to assist cost estimators in the preparation of environmental restoration estimates for Environmental Restoration and Waste Management (EM) projects undertaken by DOE. The DOE has, in recent years, seen a significant increase in the number, size, and frequency of environmental restoration projects that must be costed by the various DOE offices. The coming years will show the EM program to be the largest non-weapons program undertaken by DOE. These projects create new and unique estimating requirements since historical cost and estimating precedents are meager at best. It is anticipated that this Handbook will enhance the quality of cost data within DOE in several ways by providing: The basis for accurate, consistent, and traceable baselines. Sound methodologies, guidelines, and estimating formats. Sources of cost data/databases and estimating tools and techniques available at DOE cost professionals.

NONE

1990-09-01T23:59:59.000Z

32

Small Business Issues for Environmental Restoration Acquisitions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Issues for Environmental Issues for Environmental Restoration Acquisitions The Department of Energy's best practices to reduce and eliminate barriers to small businesses entering into prime contracts for major environmental remediation acquisitions are as follows: Withholding of Payments Billing Cycles Allowability of Insurance Bonding Requirements WITHHOLDING OF PAYMENTS Under a cost reimbursement contract, the Federal Government makes payments conditionally, subject to a final audit. Typically, in a cost reimbursement contract, the Federal Government retains a portion of the payments made to the contractor so that, at the end of the contract, when the final audit is completed and actions are taken to close

33

Summary and results of the comprehensive environmental monitoring program at the INEL's Raft River geothermal site  

DOE Green Energy (OSTI)

The Raft River Geothermal Program was designed to demonstrate that moderate temperature (approx. 150/sup 0/C) geothermal fluids could be used to generate electricity and provide an alternate energy source for direct-use applications. The environmental program was initiated soon after drilling began. The major elements of the monitoring program were continued during the construction and experimental testing of the 5-MW(e) power plant. The monitoring studies established pre-development baseline conditions of and assessed changes in the physical, biological, and human environment. The Physical Environmental Monitoring Program collected baseline data on geology, subsidence, seismicity, meteorology and air quality. The Biological Environmental Monitoring Program collected baseline data on the flora and fauna of the terrestrial ecosystem, studied raptor disturbances, and surveyed the aquatic communities of the Raft River. The Human Environmental Monitoring Program surveyed historic and archaeological sites, considered the socioeconomic environment, and documented incidences of fluorosis in the Raft River Valley. In addition to the environmental monitoring programs, research on biological direct applications using geothermal water was conducted at Raft River. Areas of research included biomass production of wetland and tree species, aquaculture, agricultural irrigation, and the use of wetlands as a treatment or pretreatment system for geothermal effluents.

Mayes, R.A.; Thurow, T.L.; Cahn, L.S.

1982-01-01T23:59:59.000Z

34

Environmental Restoration Program Records Management Plan  

SciTech Connect

This document describes the plans, organization, and control systems to be used for management of the Hanford Site Environmental Restoration (ER) Program. The Field Office Management Plan (FOMP), in conjunction with the Environmental Restoration Program Quality Assurance System Requireme ts for the Hanford Site (QASR [DOE-RL 1992a]), provides requirements governing ER Program work activities on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (WHC) ER Program Office has developed this ER Program Records Management Plan to fulfill the requirements of the FOMP (DOE-RL 1989). This records management plan will enable the ER Program Office and other ER Program participants to identify, control, and maintain the records generated and used in support of the ER Program.

Montgomery, L.M.

1992-12-01T23:59:59.000Z

35

Environmental Restoration Quality Program Implementation Plan  

SciTech Connect

The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

1992-08-01T23:59:59.000Z

36

Brookhaven Graphite Research Reactor | Environmental Restoration Projects |  

NLE Websites -- All DOE Office Websites (Extended Search)

- Cleanup Actions - Cleanup Actions Since the Brookhaven Graphite Research Reactor (BGRR) was shut down in 1968, many actions have been taken as part of the complex decommissioning. The actions undertaken throughout the BGRR complex ensure that the structures that remain are in a safe and stable condition and prepared it for long-term surveillance and maintenance. Regulatory Requirements The decommissioning of the BGRR was conducted under the federal Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). In 1992, an Interagency Agreement (PDF) among the DOE, the U.S. Environmental Protection Agency (EPA) and the New York State Department of Environmental Conservation (NYSDEC) became effective. The IAG provided the overall framework for conducting environmental restoration activities at

37

Environmental Restoration and Waste Management: Strategic plan  

Science Conference Proceedings (OSTI)

The Brookhaven National Laboratory (BNL) site is currently divided into five major areas, Operable Units (OUs), and several Areas of Concern (AOCs), which are the focus of investigation and clean-up. The primary environmental concern is groundwater contamination and a major emphasis of the restoration activities is focused on this medium. Each year, BNL generates 60 tons of hazardous waste and 7,000 to 8,000 cubic feet of radioactive waste that result from research activities. These wastes are collected at a central location, packaged and shipped off site for disposal. The operations for Hazardous and Radioactive Waste Management are conducted in compliance with EPA and DOE regulations. BNL has continued to actively pursue means by which these wastes may be minimized. Activities in both the remediation and waste management arenas are intimately connected with the future vision of BNL. The long-range goal for remediation in conjunction with vigorous monitoring of BNL`s activities is to restore the site and maintain strong environmental controls. The goals of the waste minimization program include activities to find environmentally safe alternatives to materials currently in use. By careful planning, BNL will minimize the amount of all waste, including sanitary, that is generated on site.

Not Available

1994-09-01T23:59:59.000Z

38

Environmental restoration value engineering guidance document  

SciTech Connect

This document provides guidance on Value Engineering (VE). VE is an organized team effort led by a person trained in the methodology to analyze the functions of projects, systems, equipment, facilities, services, and processes for achieving the essential functions at the lowest life cycle cost while maintaining required performance, reliability, availability, quality, and safety. VE has proven to be a superior tool to improve up-front project planning, cut costs, and create a better value for each dollar spent. This document forms the basis for the Environmental Restoration VE Program, describes the VE process, and provides recommendations on when it can be most useful on ER projects.

NONE

1995-07-01T23:59:59.000Z

39

Environmental Restoration Remedial Action Program records management plan  

SciTech Connect

The US Department of Energy-Richland Operations Office (DOE-RL) Environmental Restoration Field Office Management Plan ((FOMP) DOE-RL 1989) describes the plans, organization, and control systems to be used for management of the Hanford Site environmental restoration remedial action program. The FOMP, in conjunction with the Environmental Restoration Remedial Action Quality Assurance Requirements document ((QARD) DOE-RL 1991), provides all the environmental restoration remedial action program requirements governing environmental restoration work on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (Westinghouse Hanford) Environmental Restoration Remedial Action (ERRA) Program Office has developed this ERRA Records Management Plan to fulfill the requirements of the FOMP. This records management plan will enable the program office to identify, control, and maintain the quality assurance, decisional, or regulatory prescribed records generated and used in support of the ERRA Program. 8 refs., 1 fig.

Michael, L.E.

1991-07-01T23:59:59.000Z

40

Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 2, Part B  

SciTech Connect

Two types of projects in the spent nuclear fuel and environmental restoration and waste management activities at the Idaho National Engineering Laboratory (INEL) are described. These are: foreseeable proposed projects where some funding for preliminary planning and/or conceptual design may already be authorized, but detailed design or planning will not begin until the Department of Energy (DOE) has determined that the requirements of the National Environmental Policy Act process for the project have been completed; planned or ongoing projects not yet completed but whose National Environmental Policy Act documentation is already completed or is expected to be completed before the Record of Decision for this Envirorunental Impact Statement (EIS) is issued. The section on project summaries describe the projects (both foreseeable proposed and ongoing).They provide specific information necessary to analyze the environmental impacts of these projects. Chapter 3 describes which alternative(s) each project supports. Summaries are included for (a) spent nuclear fuel projects, (b) environmental remediation projects, (c) the decontamination and decommissioning of surplus INEL facilities, (d) the construction, upgrade, or replacement of existing waste management facilities, (e) infrastructure projects supporting waste management activities, and (f) research and development projects supporting waste management activities.

1994-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "inel environmental restoration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Project Management Plan for the INEL technology logic diagrams  

SciTech Connect

This Project Management Plan (PjMP) describes the elements of project planning and control that apply to activities outlined in Technical Task Plan (TTP) ID-121117, ``Technology Logic Diagrams For The INEL.`` The work on this project will be conducted by personnel in EG&G Idaho, Inc.`s Waste Technology Development Program. Technology logic diagrams represent a formal methodology to identify technology gaps or needs within Environmental Restoration/Waste Management Operations, which will focus on Office of Environmental Restoration and Waste Management (EM-50) research and development, demonstration, test, and evaluation efforts throughout the US Department of Energy complex. This PjMP describes the objectives, organization, roles and responsibilities, workscope and processes for implementing and managing the technology logic diagram for the Idaho National Engineering Laboratory project.

Rudin, M.J.

1992-10-01T23:59:59.000Z

42

Project Management Plan for the INEL technology logic diagrams  

SciTech Connect

This Project Management Plan (PjMP) describes the elements of project planning and control that apply to activities outlined in Technical Task Plan (TTP) ID-121117, Technology Logic Diagrams For The INEL.'' The work on this project will be conducted by personnel in EG G Idaho, Inc.'s Waste Technology Development Program. Technology logic diagrams represent a formal methodology to identify technology gaps or needs within Environmental Restoration/Waste Management Operations, which will focus on Office of Environmental Restoration and Waste Management (EM-50) research and development, demonstration, test, and evaluation efforts throughout the US Department of Energy complex. This PjMP describes the objectives, organization, roles and responsibilities, workscope and processes for implementing and managing the technology logic diagram for the Idaho National Engineering Laboratory project.

Rudin, M.J.

1992-10-01T23:59:59.000Z

43

Environmental restoration and statistics: Issues and needs  

Science Conference Proceedings (OSTI)

Statisticians have a vital role to play in environmental restoration (ER) activities. One facet of that role is to point out where additional work is needed to develop statistical sampling plans and data analyses that meet the needs of ER. This paper is an attempt to show where statistics fits into the ER process. The statistician, as member of the ER planning team, works collaboratively with the team to develop the site characterization sampling design, so that data of the quality and quantity required by the specified data quality objectives (DQOs) are obtained. At the same time, the statistician works with the rest of the planning team to design and implement, when appropriate, the observational approach to streamline the ER process and reduce costs. The statistician will also provide the expertise needed to select or develop appropriate tools for statistical analysis that are suited for problems that are common to waste-site data. These data problems include highly heterogeneous waste forms, large variability in concentrations over space, correlated data, data that do not have a normal (Gaussian) distribution, and measurements below detection limits. Other problems include environmental transport and risk models that yield highly uncertain predictions, and the need to effectively communicate to the public highly technical information, such as sampling plans, site characterization data, statistical analysis results, and risk estimates. Even though some statistical analysis methods are available off the shelf'' for use in ER, these problems require the development of additional statistical tools, as discussed in this paper. 29 refs.

Gilbert, R.O.

1991-10-01T23:59:59.000Z

44

ENVIRONMENTAL RESTORATION QUALIFICATION STANDARD REFERENCE GUIDE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Restoration Qualification Standard Reference Guide NOVEMBER 2009 i Table of Contents i FIGURES...................................................................................................................................... iv TABLES........................................................................................................................................ iv ACRONYMS ................................................................................................................................. v PURPOSE...................................................................................................................................... 1 SCOPE ...........................................................................................................................................

45

DOE Awards Contract to Restoration Services, Inc. for Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contract to Restoration Services, Inc. for Environmental Contract to Restoration Services, Inc. for Environmental Technical Services at Portsmouth Site DOE Awards Contract to Restoration Services, Inc. for Environmental Technical Services at Portsmouth Site June 25, 2008 - 2:15pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that Restoration Services, Inc. (RSI), has been awarded a task order for environmental technical services supporting the remediation and decontamination and decommissioning (D&D)of the Portsmouth Gaseous Diffusion Plant (GDP) at DOE's Portsmouth Site in Pinkerton, Ohio. The time and materials task order under the Environmental Services GSA Federal Supply Schedule is valued at approximately $67 million over five years (a three-year base period with the option to extend it for another two years).

46

Richland Environmental Restoration Project management action process document  

SciTech Connect

This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

NONE

1996-04-01T23:59:59.000Z

47

Environment, Environmental Restoration, and Waste Management Field Organization Directory  

SciTech Connect

This directory was developed by the Office of Environmental Guidance, RCRA/CERCLA Division (EH-231) from an outgrowth of the Departments efforts to identify and establish the regulatory response lead persons in the Field Organizations. The directory was developed for intemal EH-231 use to identify both the DOE and DOE contractor Field Organizations in the Environment, Environmental Restoration and Waste Management areas. The Field Organization directory is divided into three substantive sections: (1) Environment; (2) Environmental Restoration; and (3) Waste Management which are organized to correspond to the management hierarchy at each Field Organization. The information provided includes the facility name and address, individual managers name, and telephone/fax numbers.

Not Available

1993-07-01T23:59:59.000Z

48

Environmental Restoration Strategic Plan. Remediating the nuclear weapons complex  

SciTech Connect

With the end of the cold war, the US has a reduced need for nuclear weapons production. In response, the Department of Energy has redirected resources from weapons production to weapons dismantlement and environmental remediation. To this end, in November 1989, the US Department of Energy (DOE) established the Office of Environmental Restoration and Waste Management (renamed the Office of Environmental Management in 1994). It was created to bring under a central authority the management of radioactive and hazardous wastes at DOE sites and inactive or shut down facilities. The Environmental Restoration Program, a major component of DOE`s Environmental Management Program, is responsible for the remediation and management of contaminated environmental media (e.g., soil, groundwater, sediments) and the decommissioning of facilities and structures at 130 sites in over 30 states and territories.

1995-08-01T23:59:59.000Z

49

Implementation plan: Executive summary. Environmental restoration and waste management programmatic environmental impact statement  

SciTech Connect

In November 1989, the Secretary of Energy established the U.S. Department of Energy Office of Environmental Restoration and Waste Management. This action consolidated the Department`s environmental restoration and waste management activities throughout the nation. In January 1990, the Secretary of Energy decided that the Department would prepare a Programmatic Environmental Impact Statement on the proposed integrated Environmental Restoration and Waste Management Program. The principal focus of the Programmatic Environmental Impact Statement process will be the evaluation of strategies for conducting remediation of Department sites and facilities to ensure the protection of human health and the environment; and the evaluation of potential configurations for waste management capabilities.

Not Available

1994-01-01T23:59:59.000Z

50

Environmental resource document for the Idaho National Engineering Laboratory. Volume 2  

SciTech Connect

This document contains information related to the environmental characterization of the Idaho National Engineering Laboratory (INEL). The INEL is a major US Department of Energy facility in southeastern Idaho dedicated to nuclear research, waste management, environmental restoration, and other activities related to the development of technology. Environmental information covered in this document includes land, air, water, and ecological resources; socioeconomic characteristics and land use; and cultural, aesthetic, and scenic resources.

Irving, J.S.

1993-07-01T23:59:59.000Z

51

Environmental resource document for the Idaho National Engineering Laboratory. Volume 1  

SciTech Connect

This document contains information related to the environmental characterization of the Idaho National Engineering Laboratory (INEL). The INEL is a major US Department of Energy facility in southeastern Idaho dedicated to nuclear research, waste management, environmental restoration, and other activities related to the development of technology. Environmental information covered in this document includes land, air, water, and ecological resources; socioeconomic characteristics and land use; and cultural, aesthetic, and scenic resources.

Irving, J.S.

1993-07-01T23:59:59.000Z

52

Strategic plan for Hanford Site Environmental Restoration Information Management  

SciTech Connect

This strategic plan addresses information management for the Environmental Restoration (ER) Program at the Hanford Site. This Program leads the cleanup of the Hanford Site`s soil, groundwater, buried waste, and the decontamination and decommissioning of facilities. The vision that drives this strategic plan is to ensure that quality information is available to the people who need it, when they need it, at a convenient location, in a usable form, and at an acceptable cost. Although investments are being made in managing the vast amounts of information, which include data, records and documents associated with the Hanford Site`s production history and new cleanup mission, it is widely recognized that efforts to date have not accomplished the vision. Effective information management involves more than the compilation of massive amounts of electronic and non-electronic information. It also involves integrating information management into business processes that support user`s needs and decisionmaking. Only then can information management complement and enable environmental restoration priorities and practices, help identify environmental restoration requirements, and enable communication within the Environmental Restoration Program and between the Program and its stakeholders. Successfully accomplishing the Hanford Site mission requires an integrated approach to information management that crosses organizational boundaries, streamlines existing systems, and builds new systems that support the needs of the future. This plan outlines that approach.

Cowley, P.J.; Beck, J.E.; Gephart, R.E. [and others

1994-06-01T23:59:59.000Z

53

Environment/Health/Safety (EHS): Environmental Restoration Program (ERP)  

NLE Websites -- All DOE Office Websites (Extended Search)

ERP ERP ESG Home ERP Home Documents Photo Gallery Contact Us Links Environmental Restoration Program Welcome to the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab) website dedicated to its Environmental Restoration Program (ERP). The ERP is part of a nationwide effort by the United States Department of Energy (DOE) to identify and clean up contaminated areas at its facilities. The mission of the ERP is to protect human health and the environment by investigating and cleaning up soil and groundwater contaminated by past activities at Berkeley Lab. Berkeley Lab operates its Hazardous Waste Handling Facility under a Resource Conservation and Recovery Act (RCRA) Permit issued by the California Environmental Protection Agency Department of Toxic Substances

54

Richland Environmental Restoration Project management action process document  

Science Conference Proceedings (OSTI)

A critical mission of the U.S. Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration programs at DOE facilities. An integral part of this mission involves the safe and cost-effective environmental restoration of the Hanford Site. For over 40 years the Hanford Site supported United States national defense programs, largely through the production of nuclear materials. One legacy of historical Hanford Site operations is a significant waste inventory of radioactive and/or regulated chemical materials. Releases of these materials have, in some cases, contaminated the Hanford Site environment. The DOE Richland Operations Office (RL) is responsible for protecting human health and the environment from potential Hanford Site environmental hazards by identifying, assessing, and mitigating risks posed by contaminated sites.

NONE

1996-04-01T23:59:59.000Z

55

Operational Issues at the Environmental Restoration Disposal Facility at Hanford  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hanford Operations Hanford Operations Evaluating Operational Issues at the Environmental Restoration Disposal Facility at Hanford By Craig H. Benson, PhD, PE; William H. Albright, PhD; and David P. Ray, PE Sponsored by: The Office of Engineering and Technology (EM-20) 17 June 2007 i TABLE OF CONTENTS EXECUTIVE SUMMARY ii ACKNOWLEDGEMENTS iv INTRODUCTION 1 BACKGROUND 1 Environmental Restoration Disposal Facility 1 Source of Concern 2 LINES OF INQUIRY 2 1. Validate Scope of Identified Problems 2 2. Assess Contractor Evaluation of the Elevated Leachate Level on the Landfill Liner 3 3. Evaluate Adequacy of Landfill Performance in View of the Discovered Falsified Compaction Data and Potential Leachate Level Problems 4

56

Technology integration project: Environmental Restoration Technologies Department Sandia National Laboratories  

SciTech Connect

Sandia National Laboratories Environmental Restoration Technologies Department is developing environmental restoration technologies through funding form the US Department of Energy`s (DOE`s) Office of Science and Technology. Initially, this technology development has been through the Mixed Waste Landfill Integrated Demonstration (MWLID). It is currently being developed through the Contaminant Plume containment and Remediation Focus Area, the Landfill Stabilization Focus Area, and the Characterization, Monitoring, and Sensor Cross-Cutting Program. This Technology Integration Project (TIP) was responsible for transferring MWLID-developed technologies for routine use by environmental restoration groups throughout the DOE complex and commercializing these technologies to the private sector. The MWLID`s technology transfer/commercialization successes were achieved by involving private industry in development, demonstration, and technology transfer/commercialization activities; gathering and disseminating information about MWLID activities and technologies; and promoting stakeholder and regulatory involvement. From FY91 through FY95, 30 Technical Task Plans (TTPs) were funded. From these TTPs, the MWLID can claim 15 technology transfer/commercialization successes. Another seven technology transfer/commercialization successes are expected. With the changeover to the focus areas, the TIP continued the technology transfer/commercialization efforts begun under the MWLID.

Williams, C.V.; Burford, T.D. [Sandia National Labs., Albuquerque, NM (United States). Environmental Restoration Technologies] [Sandia National Labs., Albuquerque, NM (United States). Environmental Restoration Technologies; Allen, C.A. [Tech Reps, Inc., Albuquerque, NM (United States)] [Tech Reps, Inc., Albuquerque, NM (United States)

1996-08-01T23:59:59.000Z

57

Risk-based decision-making: A reality at the INEL  

SciTech Connect

Risk Analysis and Risk Management are major components of the Idaho National Engineering Laboratory`s (INEL`s) environmental restoration and waste management program. These tools help define responsible and cost-effective approaches to address potential human health and environmental risks from past operational practices. These techniques along with stake holder involvement, play a key role in the decision-making process which involves the US Department of Energy Idaho Operations Office (DOE), the US Environmental Protection Agency Region 10 (EPA), and the State of Idaho Department of Health and Welfare (IDHW), hereafter referred to as the agencies. An example of how this process works is Pad A, an above-ground mixed waste disposal site composed mainly of transuranic-contaminated evaporation pond salts. The site was constructed in 1972 for the disposal of solid radioactive wastes. A Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) baseline risk assessment was conducted to determine the incremental cancer risk and potential for adverse health effects to the public and the impacts to the environment if no action was performed. The risk characterization indicated that the carcinogenic risk for current and future hypothetical scenarios was below or within the NCP acceptable risk range. There was a potential 10 year window for an adverse health effect to an infant from nitrate contamination of the groundwater in about 250 years. Based on these results, a responsible and sound decision was reached to maintain and recontour the existing soil cover and to perform monitoring to confirm modeling assumptions.

Halford, V.E.; Nitschke, R.L. [Lockheed Idaho Technologies Co., Idaho Falls, ID (United States); Hula, G.A. [USDOE Idaho Operations Office, Idaho Falls, ID (United States)

1994-12-31T23:59:59.000Z

58

IMPACTS OF SAFETY & QUALITY IN ENVIRONMENTAL RESTORATION AT HANFORD  

Science Conference Proceedings (OSTI)

The aim of this paper is to demonstrate the integration of safety methodology, quality tools, leadership, and teamwork at Hanford and their significant positive impact on safe performance of work. Control charts, Pareto Charts, Dr. W. Edward Deming's Red Bead Experiment, and Dr. Deming's System of Profound Knowledge have been the principal tools and theory of an integrated management system. Coupled with involved leadership and teamwork they have led to significant improvements in worker safety and protection, and environmental restoration at one of the nation's largest nuclear cleanup sites.

PREVETTE, S.S.

2004-07-26T23:59:59.000Z

59

Environmental restoration and decontamination & decommissioning safety documentation. Revision 2  

SciTech Connect

This document presents recommendations of a working group designated by the Environmental Restoration and Remediation (ER) and Decontamination and Decommissioning (D&D) subcommittees of the Westinghouse M&O (Management and Operation) Nuclear Facility Safety Committee. A commonalty of approach to safety documentation specific to ER and D&D activities was developed and is summarized below. Allowance for interpretative tolerance and documentation flexibility appropriate to the activity, graded for hazard category, duration, and complexity, was a primary consideration in development of this guidance.

Hansen, J.L. [Westinghouse Savannah River Co., Aiken, SC (United States); Frauenholz, L.H. [Westinghouse Idaho Nuclear Co., Inc. (United States); Kerr, N.R. [Westinghouse Hanford Co., Richland, WA (United States)

1993-05-18T23:59:59.000Z

60

Environmental Restoration Disposal Facility (Project W-296) Safety Assessment  

SciTech Connect

This Safety Assessment is based on information derived from the Conceptual Design Report for the Environmental Restoration Disposal Facility (DOE/RL 1994) and ancillary documentation developed during the conceptual design phase of Project W-296. The Safety Assessment has been prepared to support the Solid Waste Burial Ground Interim Safety Basis document. The purpose of the Safety Assessment is to provide an evaluation of the design to determine if the process, as proposed, will comply with US Department of Energy (DOE) Limits for radioactive and hazardous material exposures and be acceptable from an overall health and safety standpoint. The evaluation considered affects on the worker, onsite personnel, the public, and the environment.

Armstrong, D.L.

1994-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "inel environmental restoration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Audit of Environmental Restoration at the Los Alamos National Laboratory. IG-0410  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

John C. Layton John C. Layton Inspector General SUBJECT: INFORMATION: Report on "Audit of Environmental Restoration at the Los Alamos National Laboratory" BACKGROUND: The Los Alamos National Laboratory (Los Alamos) Environmental Restoration Program was primarily monitored by the U.S. Environmental Protection Agency (EPA) and the New Mexico Environment Department (NMED). However, in 1995, the Department of Energy (DOE) and Los Alamos adopted a performance-based management approach to contracting to hold Los Alamos more accountable for its Environmental Restoration Program. At Los Alamos, the Environmental Restoration Program's mission is to remediate sites contaminated with various forms of hazardous,

62

Implementation Plan. Environmental Restoration and Waste Management Programmatic Environmental Impact Statement  

Science Conference Proceedings (OSTI)

In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).

Not Available

1994-01-01T23:59:59.000Z

63

Restoration and History: The Search for a Usable Environmental Past  

E-Print Network (OSTI)

Review: Restoration and History: The Search for a UsableEd). Restoration and History: The Search for a Usable87176-1. Restoration and History: The Search for a Usable

Mathoor, Vineeth

2011-01-01T23:59:59.000Z

64

Environmental monitoring, restoration and assessment: What have we learned  

Science Conference Proceedings (OSTI)

The Twenty-Eighth Hanford Symposium on Health and the Environment was held in Richland, Washington, October 16--19, 1989. The symposium was sponsored by the US Department of Energy and the Pacific Northwest Laboratory, operated by Battelle Memorial Institute. The symposium was organized to review and evaluate some of the monitoring and assessment programs that have been conducted or are currently in place. Potential health and environmental effects of energy-related and other industrial activities have been monitored and assessed at various government and private facilities for over three decades. Most monitoring is required under government regulations; some monitoring is implemented because facility operators consider it prudent practice. As a result of these activities, there is now a substantial radiological, physical, and chemical data base for various environmental components, both in the United States and abroad. Symposium participants, both platform and poster presenters, were asked to consider, among other topics, the following: Has the expenditure of millions of dollars for radiological monitoring and assessment activities been worth the effort How do we decide when enough monitoring is enough Can we adequately assess the impacts of nonradiological components -- both inorganic and organic -- of wastes Are current regulatory requirements too restrictive or too lenient Can monitoring and assessment be made more cost effective Papers were solicited in the areas of environmental monitoring; environmental regulations; remediation, restoration, and decommissioning; modeling and dose assessment; uncertainty, design, and data analysis; and data management and quality assurance. Individual reports are processed separately for the databases.

Gray, R.H. (ed.)

1990-01-01T23:59:59.000Z

65

Collecting mixed waste information for Department of Energy Environmental Restoration activities  

SciTech Connect

The US Department of Energy (DOE) Office of Environmental Restoration is currently developing an integrated data structure to link information on wastes and contaminated media from environmental restoration activities with other program information, including waste management plans. Mixed wastes are a key element of this data system because of the reporting requirements of the recent Federal Facility Compliance Act. The first step taken to satisfy various environmental restoration program needs was to develop a data call that would capture information on contamination and cleanup projections for all environmental restoration sites.

Tolbert-Smith, M. [Dept. of Energy, Germantown, MD (United States); MacDonell, M.; Peterson, J. [Argonne National Lab., IL (United States)

1994-03-01T23:59:59.000Z

66

The Fun Never Stops--Ten Years of Environmental Restoration Success at Sandia National Laboratories  

SciTech Connect

This paper provides an overview of the many contributors to the success of the Environmental Restoration Project at Sandia National Laboratories between 1992 and 2002.

Nimick, F. B.

2003-02-25T23:59:59.000Z

67

HAZARD CATEGORIZATION OF ENVIRONMENTAL RESTORATION SITES AT HANFORD WASHINGTON  

SciTech Connect

Environmental restoration activities, defined here as work to identify and characterize contaminated sites and then contain, treat, remove or dispose of the contamination, now comprises a significant fraction of work in the DOE complex. As with any other DOE activity, a safety analysis must be in place prior to commencing restoration. The rigor and depth of this safety analysis is in part determined by the site's hazard category. This category in turn is determined by the facility's hazardous material inventory and the consequences of its release. Progressively more complicated safety analyses are needed as a facility's hazard category increases from radiological to hazard category three (significant local releases) to hazard category two (significant on-site releases). Thus, a facility's hazard category plays a crucial early role in helping to determine the level of effort devoted to analysis of the facility's individual hazards. Improper determination of the category can result in either an inadequate safety analysis in the case of underestimation of the hazard category, or an unnecessarily cumbersome analysis in the case of overestimation. Contaminated sites have been successfully categorized and safely restored or remediated at the former DOE production site at Hanford, Washington. This paper discusses various means used to categorize former plutonium production or support sites at Hanford. Both preliminary and final hazard categorization is discussed. The importance of the preliminary (initial) hazard categorization in guiding further DOE involvement and approval of the safety analyses is discussed. Compliance to DOE direction provided in ''Hazard Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports'', DOE-STD-1027-92, is discussed. DOE recently issued 10 CFR 830, Subpart B which codifies previous DOE safety analysis guidance and orders. The impact of 10 CFR 830, Subpart B on hazard categorization is also discussed.

BISHOP, G.E.

2001-05-01T23:59:59.000Z

68

Nevada Environmental Restoration Project Natfonal Nuclenr Security Adminlstratlon  

Office of Legacy Management (LM)

Natfonal Nuclenr Security Adminlstratlon Natfonal Nuclenr Security Adminlstratlon Amchitka Island Surface Closure Report Revision No.: 1 July 2003 Approved for public release; further dissemination unlimited. Environmental Restoration L Available for public sale, in paper, from: U.S. Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22 16 1 Phone: 800.553.6847 Fax: 703.605.6900 Email: orders@,ntis,fedworld.~ov Online ordering: htt~:/hZww.ntis.~ov/ordering. htm Available electronically at htt~://www.doe.nov/bridge Available for a processing fee to U.S. Department of Energy and its contractors, in paper, from: U.S. Department of Energy Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 3783 1-0062 Phone: 865.576.8401

69

Nevada Environmental Restoration Project Amchitka Mud Pit Sites  

Office of Legacy Management (LM)

Amchitka Mud Pit Sites Amchitka Mud Pit Sites 2006 Post-Closure Monitoring and Inspection Report Amchitka Island, Alaska Revision No.: 0 September 2006 Environmental Restoration Project U.S. Department of Energy National Nuclear Security Administration Nevada Site Office, Available for public sale, in paper, from: U.S. Department of Cornrn&ce National Technical Information Service 5285 Port Royal Road Springfield, VA 22 1 6 1 Phone: 800.553.6847 Fax: 703.605.6900 Email: orders@,ntis. aov Online ordering: htt~://www. ntis. nov/orderinn. htm Available electronically at htt~://www. osti. godbridge Available for a processing fee to U.S. Department of Energy and its contractors, in paper, from: U.S. Department of Energy Office of Scientific and Technical Information

70

Nuclear criticality safety program for environmental restoration projects  

SciTech Connect

The Fernald Environmental Management Project (FEMP), formerly known as the Feed Materials Production Center (FMPC), is located on a 1050 acre site approximately twenty miles northwest of Cincinnati, Ohio. The production area of the site covers approximately 136 acres in the central portion of the site. Surrounding the core production area is a buffer consisting of leased grazing land, reforested land, and unused areas. The uranium processing facility was designed and constructed in the early 1950s. During the period from 1952 to 1989 the site produced uranium feed material and uranium products used in the United States weapons complex. Production at the site ended in 1989, when the site was shut down for what was expected to be a short period of time. However, the FUTC was permanently shut down in 1991, and the site`s mission was changed from production to environmental restoration. The objective of this paper is to give an update on activities at the Fernald Site and to describe the Nuclear Criticality Safety issues that are currently being addressed.

Marble, R.C.; Brown, T.D.

1994-05-01T23:59:59.000Z

71

Environmental Restoration Site-Specific Plan for the Portsmouth Gaseous Diffusion Plant, FY 93  

Science Conference Proceedings (OSTI)

The purpose of this Site-Specific Plan (SSP) is to describe past, present, and future activities undertaken to implement Environmental Restoration and Waste Management goals at the Portsmouth Gaseous Diffusion Plant (PORTS). The SSP is presented in sections emphasizing Environmental Restoration description of activities, resources, and milestones.

Not Available

1993-01-15T23:59:59.000Z

72

Identifying environmental safety and health requirements for an Environmental Restoration Management Contractor  

SciTech Connect

The purpose of the Standards/Requirements Identification Program, developed partially in response to the Defense Nuclear Facilities Safety Board Recommendation 90-2, was to identify applicable requirements that established the Environmental Restoration Management Contractor`s (ERMC) responsibilities and authorities under the Environmental Restoration Management Contract, determine the adequacy of these requirements, ascertain a baseline level of compliance with them, and implement a maintenance program that would keep the program current as requirements or compliance levels change. The resultant Standards/Requirements Identification Documents (S/RIDs) consolidate the applicable requirements. These documents govern the development of procedures and manuals to ensure compliance with the requirements. Twenty-four such documents, corresponding with each functional area identified at the site, are to be issued. These requirements are included in the contractor`s management plan.

Beckman, W.H.; Cossel, S.C.; Alhadeff, N. [Fernald Environmental Restoration Management Corp., Cincinnati, OH (United States). Fernald Environmental Management Project; Porco, D.J. [Jacobs Engineering Co., Pasadena, CA (United States); Lindamood, S.B. [Jacobs Engineering Co., Pasadena, CA (United States); Beers, J.A. [Fluor Daniel Corp. (United States)

1993-10-01T23:59:59.000Z

73

Environmental Statements, Availability, Etc., Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8679 8679 Thursday June 1, 1995 Part III Department of Energy Environmental Statements, Availability, Etc.; Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs: Notice 28680 Federal Register / Vol. 60, No. 105 / Thursday, June 1, 1995 / Notices DEPARTMENT OF ENERGY Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs AGENCY: Department of Energy. ACTION: Record of decision. SUMMARY: The Department of Energy has issued a Record of Decision on Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs. The Record of Decision includes a Department-wide decision to

74

Identifying environmental safety and health requirements for the Fernald Environmental Restoration Management Corporation  

SciTech Connect

This presentation will describe the Fernald Environmental Restoration Management Corporation`s (FERMCO) Standards/Requirements Identification Documents (S/RlDs) Program, the unique process used to implement it, and the status of the program. We will also discuss the lessons learned as the program was implemented. The Department of Energy (DOE) established the Fernald site to produce uranium metals for the nation`s defense programs in 1953. In 1989, DOE suspended production and, in 1991, the mission of the site was formally changed to one of environmental cleanup and restoration. The site was renamed the Fernald Environmental Management Project (FEMP). FERMCO`s mission is to provide safe, early, and least-cost final clean-up of the site in compliance with all regulations and commitments. DOE has managed nuclear facilities primarily through its oversight of Management and Operating contractors. Comprehensive nuclear industry standards were absent when most DOE sites were first established, Management and Operating contractors had to apply existing non-nuclear industry standards and, in many cases, formulate new technical standards. Because it was satisfied with the operation of its facilities, DOE did not incorporate modern practices and standards as they became available. In March 1990, the Defense Nuclear Facilities Safety Board issued Recommendation 90-2, which called for DOE to identify relevant standards and requirements, conduct adequacy assessments of requirements in protecting environmental, public, and worker health and safety, and determine the extent to which the requirements are being implemented. The Environmental Restoration and Waste Management Office of DOE embraced the recommendation for facilities under its control. Strict accountability requirements made it essential that FERMCO and DOE clearly identify applicable requirements necessary, determine the requirements` adequacy, and assess FERMCO`s level of compliance.

Beckman, W.H.; Cossel, S.C.; Alhadeff, N. [Fernald Environmental Restoration Management Corp., Cincinnati, OH (United States). Fernald Environmental Management Project; Porco, D.J. [Dept. of Energy, Fernald, OH (United States); Lindamood, S.B. [Jacobs Engineering, Augusta, GA (United States); Beers, J.A. [Fluor Daniel Corp., Golden, CO (United States)

1994-01-14T23:59:59.000Z

75

DOE-STD-1157-2002; Environmental Restoration Functional Area...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

restoration personnel shall demonstrate a familiarity level knowledge of chemistry fundamentals. Supporting Knowledge andor Skills a. Discuss the following types of...

76

Risk-based priority scoring for Brookhaven National Laboratory environmental restoration programs  

Science Conference Proceedings (OSTI)

This report describes the process of estimating the risk associated with environmental restoration programs under the Brookhaven National Laboratory Office of Environmental Restoration. The process was part of an effort across all Department of Energy facilities to provide a consistent framework to communicate risk information about the facilities to senior managers in the DOE Office of Environmental Management to foster understanding of risk activities across programs. the risk evaluation was a qualitative exercise. Categories considered included: Public health and safety; site personnel safety and health; compliance; mission impact; cost-effective risk management; environmental protection; inherent worker risk; environmental effects of clean-up; and social, cultural, political, and economic impacts.

Morris, S.C.; Meinhold, A.F.

1995-05-01T23:59:59.000Z

77

DOE Awards Contract to Restoration Services, Inc. for Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

at Portsmouth Site June 25, 2008 - 2:15pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that Restoration Services, Inc. (RSI), has been awarded a...

78

United States of America, Department of Energy Environmental Restoration and Waste Management Advisory Committee Public Meeting  

SciTech Connect

This report is a transcript of the public hearing of the US DOE Environmental Restoration and Waste Management Advisory Committee held in Golden, Colorado June 16--18, 1993.

1993-07-01T23:59:59.000Z

79

Environmental management 1994. Progress and plans of the environmental restoration and waste management program  

SciTech Connect

The Department of Energy currently faces one of the largest environmental challenges in the world. The Department`s Environmental Restoration and Waste Management program is responsible for identifying and reducing risks and managing waste at 137 sites in 34 States and territories where nuclear energy or weapons research and production resulted in radioactive, hazardous, and mixed waste contamination. The number of sites continues to grow as facilities are transferred to be cleaned up and closed down. The program`s main challenge is to balance technical and financial realities with the public`s expectations and develop a strategy that enables the Department to meet its commitments to the American people. This document provides a closer look at what is being done around the country. Included are detailed discussions of the largest sites in the region, followed by site activities organized by state, and a summary of activities at FUSRAP and UMTRA sites in the region.

Not Available

1994-02-01T23:59:59.000Z

80

Guidance document for the preparation of waste management plans for the Environmental Restoration Program at Oak Ridge National Laboratory. Environmental Restoration Program  

SciTech Connect

A project waste management (WM) plan is required for all Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program remedial investigation, decommission and decontamination (D&D), and remedial action (RA) activities. The project WM plan describes the strategy for handling, packaging, treating, transporting, characterizing, storing, and/or disposing of waste produced as part of ORNL ER Program activities. The project WM plan also contains a strategy for ensuring worker and environmental protection during WM activities.

Clark, C. Jr.

1993-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "inel environmental restoration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

The INEL battery data base  

SciTech Connect

The Department of Energy (DOE) has established a Battery Data Base for electric vehicle applications at the Idaho National Engineering Laboratory (INEL). The objectives of the Data Base are to collect, store, and make available to the electric vehicle community battery data from the INEL. Argonne National Laboratory, Sandia National Laboratory, and DOE battery contractors in forms appropriate for evaluating the batteries in electric vehicles. The Data Base currently includes data from over 500 test on 15 batteries of 5 different types. The data (over 120 MB) is stored on a 760 MB harddisk attached to a MicroVax 2. PC-based software to access the data has been developed on the IBM PS/2 using dBASE 4. The initial version of the Data Base to be distributed on a single floppy disk is nearly complete. The first release will include the physical characteristics of the batteries, summary tables showing the test results for each cycle of the battery test programs, and some constant power discharge data for the batteries. Later versions of the Data Base will include second-by-second peak power and SFUDS data, which will require several floppy of Bernoulli disks to store the data. 2 refs., 4 figs.

Burke, A.F.; Hardin, J.E.; Kiser, D.M.

1990-01-01T23:59:59.000Z

82

Waste Generation Forecast for DOE-ORO`s Environmental Restoration OR-1 Project: FY 1994--FY 2001. Environmental Restoration Program, September 1993 Revision  

Science Conference Proceedings (OSTI)

This Waste Generation Forecast for DOE-ORO`s Environmental Restoration OR-1 Project. FY 1994--FY 2001 is the third in a series of documents that report current estimates of the waste volumes expected to be generated as a result of Environmental Restoration activities at Department of Energy, Oak Ridge Operations Office (DOE-ORO), sites. Considered in the scope of this document are volumes of waste expected to be generated as a result of remedial action and decontamination and decommissioning activities taking place at these sites. Sites contributing to the total estimates make up the DOE-ORO Environmental Restoration OR-1 Project: the Oak Ridge K-25 Site, the Oak Ridge National Laboratory, the Y-12 Plant, the Paducah Gaseous Diffusion Plant, the Portsmouth Gaseous Diffusion Plant, and the off-site contaminated areas adjacent to the Oak Ridge facilities (collectively referred to as the Oak Ridge Reservation Off-Site area). Estimates are available for the entire fife of all waste generating activities. This document summarizes waste estimates forecasted for the 8-year period of FY 1994-FY 2001. Updates with varying degrees of change are expected throughout the refinement of restoration strategies currently in progress at each of the sites. Waste forecast data are relatively fluid, and this document represents remediation plans only as reported through September 1993.

Not Available

1993-12-01T23:59:59.000Z

83

US - Former Soviet Union environmental restoration and waste management activities, March 1994  

Science Conference Proceedings (OSTI)

The Peaceful Uses of Atomic Energy Agreement was signed between DOE and the Ministry of Atomic Energy for the Russian Federation and provides a mechanism for cooperation in research, development, and safe utilization of nuclear energy. Under the umbrella of this agreement, DOE and the former Ministry of Atomic Power and Industry signed a Memorandum of Cooperation in the areas of environmental restoration and waste management in September 1990. This document discusses the environmental situation, science and technology process, technical projects (separations, contaminant transport, waste treatment, environmental restoration), scientist exchanges, enhanced data transfer, the US-Russia industry partnership (conference, centers), and future actions.

Not Available

1994-03-01T23:59:59.000Z

84

FAQS Job Task Analyses - Environmental Restoration Functional Area Qualification  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Restoration Functional Area Qualification Restoration Functional Area Qualification Job Task Analysis CONDUCTING THE JOB / TASK ANALYSIS Identify and evaluate tasks - Develop a comprehensive list of tasks that define the job. o A great starting point is the list of Duties and Responsibilities from the FAQS. o Give careful thought to additional tasks that could be considered. o Don't worry about deleting tasks at this point - that is a part of the process further down. - List the tasks (and their sources, e.g., Duties and Responsibilities #1) in the chart below. - Discuss each task as a group and come to a consensus pertaining to Importance and Frequency of the task (i.e., each team member can consent to the assigned value, even if they don't exactly agree with it). - When all values have been assigned, consider as a group deleting tasks

85

High Flux Beam Reactor | Environmental Restoration Projects | BNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Protection Division Environmental Protection Division Home Reactor Projects Celebrating DOE's Cleanup Accomplishments (PDF) Brookhaven Graphite Research Reactor(BGRR) BGRR Overview BGRR Complex Description Decommissioning Decision BGRR Complex Cleanup Actions BGRR Documents BGRR Science & Accomplishments High Flux Beam Reactor (HFBR) HFBR Overview HFBR Complex Description Decommissioning Decision HFBR Complex Cleanup Actions HFBR Documents HFBR Science & Accomplishments Groundwater Protection Group Environmental Protection Division Contact > See also: HFBR Science & Accomplishments High Flux Beam Reactor Under the U.S. Department of Energy (DOE), the High Flux Beam Reactor (HFBR) at Brookhaven National Laboratory (BNL) underwent stabilization and partial decommissioning to prepare the HFBR confinement for long-term safe

86

Savannah River Site`s Site Specific Plan. Environmental restoration and waste management, fiscal year 1992  

SciTech Connect

This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

1991-08-01T23:59:59.000Z

87

Site specific plan. [Environmental Restoration and Waste Management, Savannah River Site  

SciTech Connect

The Environmental Restoration and Waste Management Five-Year Plan (FYP) covers the period for FY 1989 through FY 1995. The plan establishes a Department of Energy -- Headquarters (DOE-HQ) agenda for cleanup and compliance against which overall progress can be measured. The FYP covers three areas: Corrective Activities, Environmental Restoration, and Waste Management Operations. Corrective Activities are those activities necessary to bring active or standby facilities into compliance with local, state, and federal environmental regulations. Environmental restoration activities include the assessment and cleanup of surplus facilities and inactive waste sites. Waste management operations includes the treatment, storage, and disposal of wastes which are generated as a result of ongoing operations. This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show how environmental restoration and waste management activities that were identified during the preparation of the FYP will be implemented, tracked, and reported. The SSP describes DOE Savannah River (DOE-SR) and operating contractor, Westinghouse Savannah River Company (WSRC), organizations that are responsible, for undertaking the activities identified in this plan. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. 8 refs., 46 figs., 23 tabs.

Hutchison, J.; Jernigan, G.

1989-12-01T23:59:59.000Z

88

INEL spray-forming research  

SciTech Connect

Spray forming is a near-net-shape fabrication technology in which a spray of finely atomized liquid droplets is deposited onto a suitably shaped substrate or mold to produce a coherent solid. The technology offers unique opportunities for simplifying materials processing without sacrificing, and oftentimes substantially improving, product quality. Spray forming can be performed with a wide range of metals and nonmetals, and offers property improvements resulting from rapid solidification (e.g. refined microstructures, extended solid solubilities and reduced segregation). Economic benefits result from process simplification and the elimination of unit operations. Researchers at the Idaho National Engineering Laboratory (INEL) are developing spray-forming technology for producing near-net-shape solids and coatings of a variety of metals, polymers, and composite materials. Results from several spray-forming programs are presented to illustrate the range of capabilities of the technique as well as the accompanying technical and economic benefits. Low-carbon steel strip >0.75 mm thick and polymer membranes for gas/gas and liquid/liquid separations that were spray formed are discussed; recent advances in spray forming molds, dies, and other tooling using low-melting-point metals are described.

McHugh, K.M.; Key, J.F.

1992-01-01T23:59:59.000Z

89

INEL spray-forming research  

SciTech Connect

Spray forming is a near-net-shape fabrication technology in which a spray of finely atomized liquid droplets is deposited onto a suitably shaped substrate or mold to produce a coherent solid. The technology offers unique opportunities for simplifying materials processing without sacrificing, and oftentimes substantially improving, product quality. Spray forming can be performed with a wide range of metals and nonmetals, and offers property improvements resulting from rapid solidification (e.g. refined microstructures, extended solid solubilities and reduced segregation). Economic benefits result from process simplification and the elimination of unit operations. Researchers at the Idaho National Engineering Laboratory (INEL) are developing spray-forming technology for producing near-net-shape solids and coatings of a variety of metals, polymers, and composite materials. Results from several spray-forming programs are presented to illustrate the range of capabilities of the technique as well as the accompanying technical and economic benefits. Low-carbon steel strip >0.75 mm thick and polymer membranes for gas/gas and liquid/liquid separations that were spray formed are discussed; recent advances in spray forming molds, dies, and other tooling using low-melting-point metals are described.

McHugh, K.M.; Key, J.F.

1992-12-31T23:59:59.000Z

90

Pinellas Environmental Restoration Project Quarterly Progress Report, Sitewide, January through March 2004  

Office of Legacy Management (LM)

44 44 2004 GJ - - U.S. Department of Energy Pinellas Environmental Restoration Project Sitewide Environmental Monitoring Quarterly Progress Report for the Young-Rainey STAR Center January Through March 2004 April 2004 Work Performed Under DOE Contract No. for the U.S. Department of Energy Office of Legacy Management. DE-AC01-02GJ79491 Approved for public release; distribution is unlimited. Office of Legacy Management Office of Legacy Management Office of Legacy Management Office of Legacy Management N00074400 DOE-LM/GJ644-2004 Pinellas Environmental Restoration Project Sitewide Environmental Monitoring Quarterly Progress Report for the Young - Rainey STAR Center January through March 2004 April 2004 Work Performed by S.M. Stoller Corporation under DOE Contract No. DE-AC01-02GJ79491

91

Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary  

SciTech Connect

This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

Not Available

1991-09-01T23:59:59.000Z

92

Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary  

SciTech Connect

This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

1991-09-01T23:59:59.000Z

93

S M Stoller Pinellas Environmental Restoration Project - Young- Rainey Star Center  

Office of Legacy Management (LM)

Pinellas Environmental Restoration Project - Young- Rainey Star Center Pinellas Environmental Restoration Project - Young- Rainey Star Center 110406202 Accutest Job Number: F33039 Sampling Date: 07/06/05 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable.

94

S M Stoller Pinellas Environmental Restoration Project - Young- Rainey Star Center  

Office of Legacy Management (LM)

Pinellas Environmental Restoration Project - Young- Rainey Star Center Pinellas Environmental Restoration Project - Young- Rainey Star Center 7030-226 Accutest Job Number: F29125 Sampling Date: 01/06/05 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable.

95

ITEP: A survey of innovative environmental restoration technologies in the Netherlands and France  

Science Conference Proceedings (OSTI)

The International Technology Exchange Program (ITEP) of the Department of Energy`s (DOE`s) Office of Environmental Management (EM) is responsible for promoting the import of innovative technologies to better address EM`s needs and the export of US services into foreign markets to enhance US competitiveness. Under this program, potentially innovative environmental restoration technologies, either commercially available or under development in the Netherlands and France, were identified, described, and evaluated. It was found that 12 innovative environmental restoration technologies, which are either commercially available or under development in the Netherlands and France, may have some benefit for the DOE EM program and should be considered for transfer to the United States.

Roberds, W.J.; Voss, C.F.; Hitchcock, S.A. [Golder Associates, Inc., Redmond, WA (United States)

1995-05-01T23:59:59.000Z

96

INEL oversight program. Quarterly technical progress report, January 1993--December 1993  

SciTech Connect

Idaho`s successful lawsuit over shipments of spent nuclear fuel is a major milestone for 1993. The challenge forced the U.S. Department of Energy to cease all shipments of spent nuclear fuel to the Idaho National Engineering Laboratory until a site-wide environmental impact statement is completed. This agreement is a significant victory in Idaho`s battle to hold the federal government responsible for its actions and force compliance with applicable laws. Much of the State`s INEL-related activity in 1993 focused on ensuring that INEL operations are conducted in a manner that protects public health and the environment.

1994-01-01T23:59:59.000Z

97

DOE/NV-441 Nevada Environmental Restoration Project Rulison Drilling Effluent  

Office of Legacy Management (LM)

Ru\-- 7-2-4@ Ru\-- 7-2-4@ DOE/NV-441 Nevada Environmental Restoration Project Rulison Drilling Effluent Pond Site Long-Term Groundwater Monitoring Plan July 1996 Environmental Restoration U.S. Department of Energy This report has been reproduced from the best available copy. Available in paper copy and microfiche. Number of pages in this report: 5 1 DOE and DOE contractors cari obtain copies of this report from: Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 3783 1. (61 5) 576-8401. This report is publicly available from the Department of Commerce, National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22 16 1. (703) 487-4650. RULISON DRILLING EFFLUENT POND SITE LONG-TERM GROUNDWATER MONITORING PLAN DOE Nevada Operations Office

98

Environmental Restoration Site-Specific Plan for the Paducah Gaseous Diffusion Plant, FY 93  

Science Conference Proceedings (OSTI)

This report provides an overview of the major Environmental Restoration (ER) concerns at Paducah Gaseous Diffusion Plant (PGDP). The identified solid waste management units at PGDP are listed. In the Department of Energy (DOE) Five Year Plan development process, one or more waste management units are addressed in a series of activity data sheets (ADSs) which identify planned scope, schedule, and cost objectives that are representative of the current state of planned technical development for individual or multiple sites.

Not Available

1993-01-15T23:59:59.000Z

99

Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12. Environmental Restoration Program  

SciTech Connect

The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

Not Available

1991-09-01T23:59:59.000Z

100

Environmental Restoration Program waste minimization and pollution prevention self-assessment  

Science Conference Proceedings (OSTI)

The Environmental Restoration (ER) Program within Martin Marietta Energy Systems, Inc. is currently developing a more active waste minimization and pollution prevention program. To determine areas of programmatic improvements within the ER Waste Minimization and Pollution Prevention Awareness Program, the ER Program required an evaluation of the program across the Oak Ridge K-25 Site, the Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, the Paducah Environmental Restoration and Waste Minimization Site, and the Portsmouth Environmental Restoration and Waste Minimization Site. This document presents the status of the overall program as of fourth quarter FY 1994, presents pollution prevention cost avoidance data associated with FY 1994 activities, and identifies areas for improvement. Results of this assessment indicate that the ER Waste Minimization and Pollution Prevention Awareness Program is firmly established and is developing rapidly. Several procedural goals were met in FY 1994 and many of the sites implemented ER waste minimization options. Additional growth is needed, however, for the ER Waste Minimization and Pollution Prevention Awareness Program.

Not Available

1994-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "inel environmental restoration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Environmental restoration and waste management Site-Specific Plan for the Oak Ridge Reservation. FY 1993  

Science Conference Proceedings (OSTI)

The United States Department of Energy (DOE) is committed to achieving and maintaining environmental regulatory compliance while responding to public concerns and emphasizing waste minimization. DOE publishes the Environmental Restoration and Waste Management Five-Year Plan (FYP) annually to document its progress towards these goals. The purpose of this Site-Specific Plan (SSP) is to describe the activities undertaken to implement the FYP goals at the DOE Oak Ridge Field Office (DOE/OR) installations and programs specifically for the Oak Ridge Reservation (ORR) and surrounding areas. This SSP addresses activities and goals to be accomplished during FY93 even through the FYP focuses on FY94.

Not Available

1993-01-15T23:59:59.000Z

102

The In Situ Vitrification Integrated Program: Focusing an innovative solution on environmental restoration needs  

Science Conference Proceedings (OSTI)

The objective of the In Situ Vitrification (ISV) Integrated Program is to ensure that ISV is a viable alternative for DOE environmental restoration applications. The program focuses ISV development activities upon DOE-wide environmental remediation needs and resolves issues inhibiting timely implementation on DOE sites. currently the ISV Integrated Program is focused on contaminated soil sites but is also resolving some key issues that are common to soils and to potential future applications such as buried waste and underground structures. This paper describes the status and current focus of the ISV Integrated Program.

Buelt, J.L.; Thompson, L.E.

1992-08-01T23:59:59.000Z

103

Decision analysis for INEL hazardous waste storage  

Science Conference Proceedings (OSTI)

In mid-November 1993, the Idaho National Engineering Laboratory (INEL) Waste Reduction Operations Complex (WROC) Manager requested that the INEL Hazardous Waste Type Manager perform a decision analysis to determine whether or not a new Hazardous Waste Storage Facility (HWSF) was needed to store INEL hazardous waste (HW). In response to this request, a team was formed to perform a decision analysis for recommending the best configuration for storage of INEL HW. Personnel who participated in the decision analysis are listed in Appendix B. The results of the analysis indicate that the existing HWSF is not the best configuration for storage of INEL HW. The analysis detailed in Appendix C concludes that the best HW storage configuration would be to modify and use a portion of the Waste Experimental Reduction Facility (WERF) Waste Storage Building (WWSB), PBF-623 (Alternative 3). This facility was constructed in 1991 to serve as a waste staging facility for WERF incineration. The modifications include an extension of the current Room 105 across the south end of the WWSB and installing heating, ventilation, and bay curbing, which would provide approximately 1,600 ft{sup 2} of isolated HW storage area. Negotiations with the State to discuss aisle space requirements along with modifications to WWSB operating procedures are also necessary. The process to begin utilizing the WWSB for HW storage includes planned closure of the HWSF, modification to the WWSB, and relocation of the HW inventory. The cost to modify the WWSB can be funded by a reallocation of funding currently identified to correct HWSF deficiencies.

Page, L.A.; Roach, J.A.

1994-01-01T23:59:59.000Z

104

Environmental Restoration  

NLE Websites -- All DOE Office Websites (Extended Search)

were dried, mixed, crushed and then aliquots of the soil were dissolved using a potassium fluoride pyrosulfate fusion in which strontium was precipitated as a sulfate. Successive...

105

Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 496: Buried Rocket Site, Antelope Lake, Tonopah Test Range  

SciTech Connect

This Streamlined Approach for Environmental Restoration (SAFER) plan details the activities necessary to close Corrective Action Unit 496: Buried Rocket Site, Antelope Lake. CAU 496 consists of one site located at the Tonopah Test Range, Nevada.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Bechtel Nevada

2004-05-01T23:59:59.000Z

106

Plasma treatment of INEL soil contaminated with heavy metals  

Science Conference Proceedings (OSTI)

INEL soil spiked with inorganic salts of chromium, lead, mercury, silver, and zinc was melted in a 150 kW plasma furnace to produce a glassy slag product. This glassy slag is an environmentally safe waste form. In order to reduce the melting temperature of the soil, sodium carbonate was added to half of the test batches. Random sample from each batch of glassy slag product were analyzed by an independent laboratory for total metals concentration and leachability of metals via the Environmental Protection Agency (EPA) toxicity characterization leaching procedure (RCLP) tests. These tests showed the residual metals were very tightly bound to the slag matrix and were within EPA TCLP limits under these test conditions. Additionally, scanning electron microscopy (SEM) and emissions dispersive spectroscopy (EDS) analysis of the vitrified soil also confirmed that the added metals present in the vitrified soil were totally contained in the crystalline phase as distinct oxide crystallites.

Detering, B.A.; Batdorf, J.A.

1992-01-01T23:59:59.000Z

107

Lower Yakima Valley Wetlands and Riparian Restoration Project. Final Environmental Assessment.  

DOE Green Energy (OSTI)

Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Mitigation Agreement pertaining to the Lower Yakima Valley Wetlands and Riparian Restoration Project (Project) in a cooperative effort with the Yakama Indian Nation and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities for the Project within the boundaries of the Yakama Indian Reservation. This Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large 20, 340 hectare (50, 308 acre) project area. As individual properties are secured for the Project, three site-specific activities (habitat enhancement, operation and maintenance, and monitoring and evaluation) may be subject to further site-specific environmental review. All required Federal/Tribal coordination, permits and/or approvals would be obtained prior to ground disturbing activities.

United States. Bonneville Power Administration

1994-10-01T23:59:59.000Z

108

Environmental Science and Research Foundation annual technical report to DOE-ID, January , 1995--December 31, 1995  

Science Conference Proceedings (OSTI)

The foundation conducts an environmental monitoring and surveillance program over an area covering much of the upper Snake River Plain and provide environmental education and support services related to INEL natural resource issues. Also, the foundation, with its university affiliates, conducts ecological and radioecological research on the Idaho National Environmental Research Park. This research benefits major DOE-ID programs including waste management, environmental restoration, spent nuclear fuels, and land management issues. Major accomplishments during CY1995 can be divided into five categories: environmental surveillance program, environmental education, environmental services and support, ecological risk assessment, and research benefitting the DOE-ID mission.

NONE

1996-06-01T23:59:59.000Z

109

Oak Ridge Environmental Information System (ORIES) site workstation information packet for OREIS V1.2. Environmental Restoration Program  

Science Conference Proceedings (OSTI)

The OREIS site workstation information packet was developed to accompany the OREIS site workstations, which are being delivered to the Environmental Restoration programs at the five DOE-OR sites. The packet is written specifically for the Site ER program staff at each of the five Sites who have been designated the OREIS contact by their ER program manager, and is not intended for general distribution. The packet provides an overview of the components of OREIS, points to more detailed information provided in the accompanying vendor and OREIS developed manuals, and includes information on training opportunities and user support.

Voorhees, L.D.; McCord, R.A.; Durfee, R.C.; Land, M.L.; Olson, R.J.; Palmer, M.R.; Thomas, J.K.; Tinnel, E.P.; Zygmunt, B.C.

1993-02-01T23:59:59.000Z

110

Proceedings of Workshop on Uranium Production Environmental Restoration: An exchange between the United States and Germany  

SciTech Connect

Scientists, engineers, elected officials, and industry regulators from the United, States and Germany met in Albuquerque, New Mexico, August 16--20, 1993, in the first joint international workshop to discuss uranium tailings remediation. Entitled ``Workshop on Uranium Production Environmental Restoration: An Exchange between the US and Germany,`` the meeting was hosted by the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The goal of the workshop was to further understanding and communication on the uranium tailings cleanup projects in the US and Germany. Many communities around the world are faced with an environmental legacy -- enormous quantities of hazardous and low-level radioactive materials from the production of uranium used for energy and nuclear weapons. In 1978, the US Congress passed the Uranium Mill Tailings Radiation Control Act. Title I of the law established a program to assess the tailings at inactive uranium processing sites and provide a means for joint federal and state funding of the cleanup efforts at sites where all or substantially all of the uranium was produced for sale to a federal agency. The UMTRA Project is responsible for the cleanup of 24 sites in 10 states. Germany is facing nearly identical uranium cleanup problems and has established a cleanup project. At the workshop, participants had an opportunity to interact with a broad cross section of the environmental restoration and waste disposal community, discuss common concerns and problems, and develop a broader understanding of the issues. Abstracts are catalogued individually for the data base.

Not Available

1993-12-31T23:59:59.000Z

111

Establishment of review groups on US Department of Energy Environmental Restoration and Waste Management Program  

SciTech Connect

A primary purpose of this grant was the establishment of expert research review groups to help facilitate expanded and improved communications and information among states, public, federal agencies, contractors, and DOE, relative to national environmental and waste management issues/problems. The general objectives of this grant were: Research on the further participation avenues of industry and academia and provide appropriate research documentation concerning the implementation of multi-party agreements; Analysis of the impediments that delay the accomplishment of agreements between states and the federal government for environmental compliance, as well as an assessment of the public need for research because of the above agreements; Analysis of the impact of environmental actions on states, industry, academia, public and other federal agencies; Provide research to help facilitate an interactive system that provides the various involved parties the capability and capacity to strengthen their commitment to national environmental and waste management goals and objectives; and Furthering research of public education in the environmental arena and research of needed national education resources in scientific and technical areas related to environmental restoration and waste management.

Eyman, L.D.

1992-12-01T23:59:59.000Z

112

S.M. Stoller Corporation and US Department of Energy PINELLAS ENVIRONMENTAL RESTORATION  

Office of Legacy Management (LM)

for: for: S.M. Stoller Corporation and US Department of Energy PINELLAS ENVIRONMENTAL RESTORATION PROJECT YOUNG - RAINEV STAR CENTER EVALUATION OF SUBSURFACE VAPOR INTRUSION BUILDING 100 LARGO, FLORIDA Prepared b y : 1 3 0 Research Lane, Suite 2 Guelph, Ontario N I G 5G3 GeoSyntec Project Number TR0 1 5 0 2 6 June 2 0 0 3 GeoSyntec Consultants TABLE OF CONTENTS Page 2. BACKGROUND .................................................................................................. 2 3. CONSIDERATION OF THE RECENT OSWER GUIDANCE DOCUMENT.. 4 4. APPROACH AND RATIONALE ....................................................................... 5 5 . ESTIMATED INDOOR AIR CONCENTRATIONS - ENTIRE BUILDING ... 6 6. ESTIMATED INDOOR AIR CONCENTRATIONS - BUILDING SUBSECTION ..................................................................................... .............. 8

113

Information Management Architecture for an Integrated Computing Environment for the Environmental Restoration Program. Volume 1, Introduction  

SciTech Connect

As part of the Environmental Restoration Program at Martin Marietta, IEM (Information Engineering Methodology) was developed as part of a complete and integrated approach to the progressive development and subsequent maintenance of automated data sharing systems. This approach is centered around the organization`s objectives, inherent data relationships and business practices. IEM provides the Information Systems community with a tool kit of disciplined techniques supported by automated tools. It includes seven stages: Information Strategy Planning; Business Area Analysis; Business System Design; Technical Design; Construction; Transition; Production.

Not Available

1994-09-01T23:59:59.000Z

114

A systematic approach to evaluate erosion potential at environmental restoration sites  

Science Conference Proceedings (OSTI)

The Environmental Restoration (ER) Project at the Los Alamos National Laboratory (LANL) is responsible for investigation and remediation of solid waste management units (SWMUs) under the Resource Conservation and Recovery Act and area of concerns (AOCs) under the direction of the Department of Energy. During the investigation and remediation phases, information may be gathered that indicates that conditions may be present at the site which may effect surface water quality. Depending on the constituent found, its concentration, and erosion/sediment transport potential, it may be necessary to implement temporary or permanent mitigative measures.

Veenis, S.J.; Mays, D.C. [Merrick and Co., Los Alamos, NM (United States)

1998-12-01T23:59:59.000Z

115

Environmental restoration at the Pantex Plant. Quarterly progress report, April 12, 1995--June 30, 1995  

Science Conference Proceedings (OSTI)

This report summarizes the Work Plans for activities associated with Environmental Restoration of the perched aquifer and contaminated soils at the Pantex Plant. The Higher Education Consortium/Pantex Research Laboratory is participating in the Consortium Grant to evaluate subsurface remediation alternatives for the perched aquifer at the Pantex Plant. Research activities will develop site characterization data and evaluate remediation alternatives for the perched aquifer and the overlying vadose zone. The work plans cover research activities for the remainder of FY95, and proposed activities for FY96 and thereafter. A separate document will present more detailed plans for FY96 activities and budget requirements.

Charbeneau, R.J.

1995-06-19T23:59:59.000Z

116

Strategic plan strategy of the Oak Ridge National Laboratory Environmental Restoration Program  

SciTech Connect

This report provides information about the use of an integrated strategic plan, strategy, and life-cycle baseline in the long range planning and risk process employed by the environmental restoration program at the Oak Ridge National Laboratory (ORNL). Long-range planning is essential because the ER Program encompasses hundreds of sites; will last several decades; and requires complex technology, management, and policy. Long-range planning allows a focused, cost-effective approach to identify and meet Program objectives. This is accomplished through a strategic plan, a strategy, and a life-cycle baseline. This long-range methodology is illustrated below.

1995-06-01T23:59:59.000Z

117

Sulimar Queen environmental restoration project closure package Sandia environmental stewardship exemplar.  

SciTech Connect

In March 2008, Sandia National Laboratories (Sandia), in partnership with the Bureau of Land Management, Roswell Field Office, completed its responsibilities to plug and abandon wells and restore the surface conditions for the Sulimar Queens Unit, a 2,500 acre oil field, in Chaves County, Southeast New Mexico. Sandia assumed this liability in an agreement to obtain property to create a field laboratory to perform extensive testing and experimentation on enhanced oil recovery techniques for shallow oil fields. In addition to plugging and abandoning 28 wells, the project included the removal of surface structures and surface reclamation of disturbed lands associated with all plugged and abandoned wells, access roads, and other auxiliary facilities within unit boundaries. A contracting strategy was implemented to mitigate risk and reduce cost. As the unit is an important wildlife habitat for prairie chickens, sand dune lizards, and mule deer, the criteria for the restoration and construction process were designed to protect and enhance the wildlife habitat. Lessons learned from this project include: (1) extreme caution should be exercised when entering agreements that include future liabilities, (2) partnering with the regulator has huge benefits, and (3) working with industry experts, who were familiar with the work, and subcontractors, who provided the network to complete the project cost effectively.

Tillman, Jack B.

2008-09-01T23:59:59.000Z

118

Summary - Operational Issues at the Environmental Restoration Disposal Facility (ERDF) at Hanford  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ERDF ERDF ETR Report Date: June 2007 ETR-6 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of the Operational Issues at the Environmental Restoration Disposal Facility(ERDF) at Hanford Why DOE-EM Did This Review The ERDF is a large- scale disposal facility authorized to receive waste from Hanford cleanup activities. It contains double-lined cells with a RCRA Subtitle C- type liner and leachate collection system. By 2007, 6.8 million tons of waste with 39,000 Curies of radioactivity had been placed in the ERDF. In 2006, events occurred that affected the operation of the automatic leachate transfer pumps and a technician confessed to having not performed compaction tests and to falsification of the data.

119

S M Stoller Pinellas Environmental Restoration Project - Young - Rainey Star Center  

Office of Legacy Management (LM)

6/06 6/06 Technical Report for S M Stoller Pinellas Environmental Restoration Project - Young - Rainey Star Center 110406202 Accutest Job Number: F43553 Sampling Date: 09/07/06 Report to: U.S. Dept of Energy, Grand Jct Office 2597 B 3/4 Road Grand Juction, CO 81503 ATTN: Contracts Department, PO# 24231 x Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference

120

Health and safety plan for operations performed for the Environmental Restoration Program  

SciTech Connect

This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

Trippet, W.A. II (IT Corp., (United States)); Reneau, M.; Morton, S.L. (EG and G Idaho, Inc., Idaho Falls, ID (United States))

1992-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "inel environmental restoration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Environmental restoration/waste management-applied technology semiannual report, January--June 1992. Volume 1, No. 1  

SciTech Connect

This is the first issue from the Lawrence Livermore National Laboratory of The Environmental Restoration/Waste Management-Applied Technology (ER/WM-AT) Semiannual Report, a continuation of the Advanced Processing Technology (APT) Semiannual Report. The name change reflects the consolidation of the APT Program with the Environmental Restoration and Waste Management Program to form the Environmental Restoration/Waste Management-Applied Technology (ER/WM-AT) Program. The Livermore site mirrors, on a small scale, many of the environmental and waste management problems of the DOE Complex. The six articles in this issue cover incineration- alternative technologies, process development for waste minimization, the proposed Mixed Waste Management Facility, dynamic underground stripping, electrical resistance tomography, and Raman spectroscopy for remote characterization of underground tanks.

Adamson, M.; Kline-Simon, K. [eds.

1992-12-31T23:59:59.000Z

122

Site descriptions of environmental restoration units at the Oak Ridge K-25 Site, Oak Ridge, Tennessee  

SciTech Connect

This report, Site Descriptions of Environmental Restoration Units at the Oak Ridge K-25 Site, Oak Ridge, Tennessee, is being prepared to assimilate information on sites included in the Environmental Restoration (ER) Program of the K-25 Site, one of three major installations on the Oak Ridge Reservation (ORR) built during World War III as part of the Manhattan Project. The information included in this report will be used to establish program priorities so that resources allotted to the K-25 ER Program can be best used to decrease any risk to humans or the environment, and to determine the sequence in which any remedial activities should be conducted. This document will be updated periodically in both paper and Internet versions. Units within this report are described in individual data sheets arranged alphanumerically. Each data sheet includes entries on project status, unit location, dimensions and capacity, dates operated, present function, lifecycle operation, waste characteristics, site status, media of concern, comments, and references. Each data sheet is accompanied by a photograph of the unit, and each unit is located on one of 13 area maps. These areas, along with the sub-area, unit, and sub-unit breakdowns within them, are outlined in Appendix A. Appendix B is a summary of information on remote aerial sensing and its applicability to the ER program.

Goddard, P.L.; Legeay, A.J.; Pesce, D.S.; Stanley, A.M.

1995-11-01T23:59:59.000Z

123

Environmental Restoration Program quality system requirements for the Hanford Site. Revision 2  

SciTech Connect

This document defines the quality system requirements for the US Department of Energy, Richland Operations Office, Environmental Restoration Program at the Hanford Site. The Quality System Requirements (OSR) for the Hanford Site integrates quality assurance requirements from the US Department of Energy Orders, the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), and applicable industry standards into a single source document for the development of quality systems applicable to the Environmental Restoration Program activities. This document, based on fifteen criteria and divided intro three parts, provides user organizations with the flexibility to incorporate only those criteria and parts applicable to their specific scopes of work. The requirements of this document shall be applied to activities that affect quality based on a graded approach that takes into consideration the risk inherent in, as well as the importance of, specific items, services, and activities in terms of meeting ER Program objectives and customer expectations. The individual quality systems developed in accordance with this document are intended to provide an integrated management control system that assures the conduct of ER Program activities in a manner that protects human health and the environment.

Cote, R.F.

1993-11-01T23:59:59.000Z

124

The value of historical records and corporate memory in environmental restoration work at DOE facilities  

SciTech Connect

Historical records of older envirorunental and waste-related work at Department of Energy (DOE) facilities are often overlooked in the rush to meet current-time deadlines. Nevertheless, historical records of activities, and corporate memory of why specific activities took place, can prove extremely useful and cost-effective in modem environmental work. This paper wig concentrate on the value of historical records for older sites within the DOE complex. Already available information can save thousands to millions of dollars in the course of environmental restoration work at one DOE facility. This money can be better spent on sites and areas that require these expenses, rather than re-developing information that is already available and otherwise known. The intent of this paper is to present information on the value and types of historical records available at DOE facilities, and examples of possible current uses of those records during current site environmental work. Illustrative examples of the use of historical records are drawn from experience gained at the Rocky Flats Plant (RFP), near Denver, Colorado. It is hoped that, where possible, such historical information will see increasing use in order to allow for more efficient, effective, and less costly environmental work at DOE facilities.

Swenson, B.A. (EG and G Rocky Flats, Inc., Golden, CO (United States). Rocky Flats Plant); Blaha, F.J. (Wright Water Engineers, Inc. (United States)); Sieben, A.K. (Doty and Associates (United States))

1993-01-28T23:59:59.000Z

125

Second annual report of the Environmental Restoration Monitoring and Assessment Program at Oak Ridge National Laboratory  

Science Conference Proceedings (OSTI)

This report summarizes the salient features of the annual efforts of environmental monitoring and field investigations conducted to support the Environmental Restoration (ER) Program at the Oak Ridge National Laboratory (ORNL). This report focuses on the watershed scale, striving to provide an ORNL site-wide perspective on types, distribution, and transport of contamination. Results are used to enhance the conceptual understanding of the key contaminants and the sources, fluxes, and processes affecting their distribution and movement. This report summarizes the efforts of the Waste Area Grouping (WAG) 2 and Site Investigations (SI) program. WAG 2 is the lower portion of the White Oak Creek (WOC) system which drains the major contaminated sites at ORNL and discharges to the Clinch River where public access is allowed. The remedial investigation for WAG 2 includes a long-term multimedia environmental monitoring effort that takes advantage of WAG 2`s role as an integrator and conduit of contaminants from the ORNL site. This report also includes information from other site-specific remedial investigations and feasibility studies (RI/FS) for contaminated sites at ORNL and data from other ongoing monitoring programs conducted by other organizations [e.g., the National Pollutant Discharge Elimination System (NPDES) compliance monitoring conducted by the Environmental Surveillance and Protection Section]. This information is included to provide an integrated basis to support ER decision making. This report summarizes information gathered through early 1993. Annual data, such as annual discharges of contaminants, are reported for calendar year 1992.

Clapp, R.B.; Watts, J.A. [eds.

1993-09-01T23:59:59.000Z

126

Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory  

SciTech Connect

This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65. The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water.

Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.; Uziel, M.S.; Kleinhans, K.R.; Tiner, P.F.

1994-08-01T23:59:59.000Z

127

Environmental assessment of the Environmental Restoration Project at Sandia National Laboratories/New Mexico  

SciTech Connect

Sandia National Laboratories/New Mexico (SNL/NM) is managed and operated for the U.S. Department of Energy (DOE) by Sandia Corporation, a subsidiary of the Lockheed Martin Company. SNL/NM is located on land controlled by DOE within the boundaries of Kirtland Air Force Base (KAFB) in Albuquerque, New Mexico. The major responsibilities of SNL/NM are the support of national security and energy projects. This report provides an environmental assessment of proposed remedial action activities at the solid waste management units at SNL/NM. A risk assessment of health hazards is also discussed.

NONE

1996-03-01T23:59:59.000Z

128

Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 1, Appendix C, Savannah River Site Spent Nuclear Fuel Mangement Program  

Science Conference Proceedings (OSTI)

The US Department of Energy (DOE) is engaged in two related decision making processes concerning: (1) the transportation, receipt, processing, and storage of spent nuclear fuel (SNF) at the DOE Idaho National Engineering Laboratory (INEL) which will focus on the next 10 years; and (2) programmatic decisions on future spent nuclear fuel management which will emphasize the next 40 years. DOE is analyzing the environmental consequences of these spent nuclear fuel management actions in this two-volume Environmental Impact Statement (EIS). Volume 1 supports broad programmatic decisions that will have applicability across the DOE complex and describes in detail the purpose and need for this DOE action. Volume 2 is specific to actions at the INEL. This document, which limits its discussion to the Savannah River Site (SRS) spent nuclear fuel management program, supports Volume 1 of the EIS. Following the introduction, Chapter 2 contains background information related to the SRS and the framework of environmental regulations pertinent to spent nuclear fuel management. Chapter 3 identifies spent nuclear fuel management alternatives that DOE could implement at the SRS, and summarizes their potential environmental consequences. Chapter 4 describes the existing environmental resources of the SRS that spent nuclear fuel activities could affect. Chapter 5 analyzes in detail the environmental consequences of each spent nuclear fuel management alternative and describes cumulative impacts. The chapter also contains information on unavoidable adverse impacts, commitment of resources, short-term use of the environment and mitigation measures.

Not Available

1994-06-01T23:59:59.000Z

129

INEL metal recycle annual report, FY-94  

SciTech Connect

In 1992, the mission of the Idaho Chemical Processing Plant was changed from reprocessing of spent nuclear fuels to development of technologies for conditioning of spent nuclear fuels and other high-level wastes for disposal in a geologic repository. In addition, the Department of Energy (DOE) directed Idaho National Engineering Laboratory (INEL) to develop a program plan addressing the management of radioactive contaminated scrap metal (RSM) within the DOE complex. Based on discussions with the EM-30 organization, the INEL Metal Recycle program plan was developed to address all issues of RSM management. Major options considered for RSM management were engineered interim storage, land disposal as low-level waste, and beneficial reuse/recycle. From its inception, the Metal Recycle program has emphasized avoidance of storage and disposal costs through beneficial reuse of RSM. The Metal Recycle program plan includes three major activities: Site-by-site inventory of RSM resources; validation of technologies for conversion of RSM to usable products; and identification of parties prepared to participate in development of a RSM recycle business.

Bechtold, T.E. [ed.

1994-09-01T23:59:59.000Z

130

Pinellas Environmental Restoration Project Quarterly Progress Report, 4.5 Acre January through March 2004  

Office of Legacy Management (LM)

January through March 2004 January through March 2004 April 2004 Work Performed Under DOE Contract No. for the U.S. Department of Energy Office of Legacy Management. DE-AC01-02GJ79491 Approved for public release; distribution is unlimited. Office of Legacy Management Office of Legacy Management Office of Legacy Management Office of Legacy Management DOE LM/ 645 2004 GJ - - N0074500 DOE-LM/GJ645-2004 Pinellas Environmental Restoration Project Quarterly Progress Report 4.5 Acre Site January through March 2004 April 2004 Work Performed by S.M. Stoller Corporation under DOE Contract No. DE-AC01-02GJ79491 for the U.S. Department of Energy Office of Legacy Management, Grand Junction, Colorado Document Number N0074500 Contents U.S. Department of Energy 4.5 Acre Site Quarterly Progress Report

131

ORNLIRASA-95117 LIFE SCIENCES DIVISION Environmental Restoration and Waste Management Non-Defense Programs  

Office of Legacy Management (LM)

95117 95117 LIFE SCIENCES DIVISION Environmental Restoration and Waste Management Non-Defense Programs (Activity No. EX 20 20 01 0; ADS1310AA) Results of the Independent Radiological Verification Survey at the Former Chapman Valve Manufacturing Company, Indian Orchard, Massachusetts (cIooo1v) R. E. Rodriguez and C. A. Johnson Date issued -May 1997 Investigation Team R. D. Foley-Measurement Applications and Development Manager M. E. Murray-FUSRAP Project Director R. E. Rodriguez-Field Survey Team Leader Survey Team Members R. C. Gosslee V. P. Patania R. E. Rodriguez Work performed by the Measurement Applications and Development Group Prepared by the OAK RIDGE NATIONAL LABORATORY Oak Ridge, Tennessee 37831-6285 managed by LOCKHEED MARTIN ENERGY RESEARCH CORP.

132

TSD capacity model interface with waste reduction planning in the Environmental Restoration Program  

Science Conference Proceedings (OSTI)

This report provides a picture of how the integration of waste generation forecasting with treatment, storage, and disposal (TSD) capacity modeling interfaces with waste reduction planning in the Environmental Restoration Program. Background information is given for the major activities at the seven Martin Marietta Energy Systems, Inc., sites: (1) Oak Ridge National Laboratory; (2) Oak Ridge Y-12 Plant; (3) Oak Ridge K-25 Site; (4) Paducah Gaseous Diffusion Plant; (5) Portsmouth Gaseous Diffusion Plant; (6) Oak Ridge Associated Universities; and (7) the off-site contaminated areas near DOE facilities. A perspective is provided for strategies to achieve waste reduction, how waste generation forecasts rates were developed, and how those forecasted waste generation rates will be used in TSD capacity modeling. The generation forecasting in combination with TSD modeling allows development of quantifiable goals and subsequent waste reduction. 2 figs.

Phifer, B.E. Jr.; Grumski, J.T.

1991-01-01T23:59:59.000Z

133

Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 1, Main text. Environmental Restoration Program  

SciTech Connect

This publication contains 1035 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. These citations constitute the thirteenth in a series of reports prepared annually for the US Department of Energy (DOE) Environmental Restoration programs. Citations to foreign and domestic literature of all types. There are 13 major sections of the publication, including: (1) DOE Decontamination and Decommissioning Program; (2) Nuclear Facilities Decommissioning; (3) DOE Formerly Utilized Sites Remedial Action Program; (4) DOE Uranium Mill Tailings Remedial Action Project; (5) Uranium Mill Tailings Management; (6) DOE Environmental Restoration Program; (7) DOE Site-Specific Remedial Actions; (8) Contaminated Site Restoration; (9) Remediation of Contaminated Soil and Groundwater; (10) Environmental Data Measurements, Management, and Evaluation; (11) Remedial Action Assessment and Decision-Making; (12) Technology Development and Evaluation; and (13) Environmental and Waste Management Issues. Bibliographic references are arranged in nine subject categories by geographic location and then alphabetically by first author, corporate affiliation, or publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word.

Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

1992-09-01T23:59:59.000Z

134

Environmental Science and Research Foundation. Annual technical report, April 11, 1994--December 31, 1994  

SciTech Connect

This Annual Technical Report describes work conducted for the Department of Energy, Idaho Operations Office, by the Environmental Science and Research Foundation (Foundation) for work under contract DE-AC07-94ID13268. The Foundation began, on April 11, 1994, to conduct environmental surveillance near to and distant from the Idaho National Engineering Laboratory, provide environmental public relations and education related to INEL natural resource issues, and conduct ecological and radioecological research benefiting major DOE-ID programs including Waste Management, Environmental Restoration, Spent Nuclear Fuels, and Infrastructure.

Reynolds, T.D.; Morris, R.C.; Markham, O.D. [eds.

1995-06-01T23:59:59.000Z

135

Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 489: WWII UXO Sites, Tonopah Test Range, Nevada; May 2005  

Science Conference Proceedings (OSTI)

This Streamlined Approach for Environmental Restoration Plan provides the details for the closure of Corrective Action Unit (CAU) 489: WWII UXO Sites, Tonopah Test Range. CAU 489 is located at the Tonopah Test Range and is currently listed in Appendix III of the Federal Facility Agreement and Consent Order of 1996.

Bechtel Nevada; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

2005-05-01T23:59:59.000Z

136

STREAMLINED APPROACH FOR ENVIRONMENTAL RESTORATION PLAN FOR CORRECTIVE ACTION UNIT 116: AREA 25 TEST CELL C FACILITYNEVADA TEST SITE, NEVADA  

SciTech Connect

This Streamlined Approach for Environmental Restoration Plan identifies the activities required for the closure of Corrective Action Unit 116, Area 25 Test Cell C Facility. The Test Cell C Facility is located in Area 25 of the Nevada Test Site approximately 25 miles northwest of Mercury, Nevada.

NONE

2006-07-01T23:59:59.000Z

137

Fiscal year 1990 Rocky Flats Plant Environmental Restoration program Current-Year Work Plan  

SciTech Connect

The Rocky Flats Plant (RFP) is a nuclear weapons manufacturing facility currently operated by EG G for the US Department of Energy (DOE). RFP is located at the foot of the Rocky Mountains in Jefferson Country, Colorado. The Fiscal Year 1990 (FY90) Current-Year Work Plan (CYWP) is intended to serve as a guidance document for the Environmental Restoration (ER) and RCRA Compliance programs that will be implemented at RFP. The CYWP provides in one document any cross-references necessary to understand the interrelationships between the CYWP and the DOE Five-Year Plan (FYP), Site-Specific Plan (SSP), and other related documents. The scope of this plan includes comparison of planned FY90 ER activities to those actually achieved. The CYWP has been updated to include Colorado Department of Health (CDH), US Environmental Protection Agency (EPA), and DOE Inter-Agency Agreement ER activities. It addresses hazardous wastes, radioactive wastes, mixed wastes (radioactive and hazardous), and sanitary wastes. The CYWP also addresses facilities and sites contaminated with or used in management of those wastes.

Nielsen, T. (EG and G Rocky Flats, Inc., Golden, CO (USA)); Waage, E.; Miller, D. (Stoller (S.M.) Corp., Boulder, CO (USA))

1990-01-01T23:59:59.000Z

138

Interagency Review of the Department of Energy Environmental Restoration and Waste Management Program  

SciTech Connect

This report presents the findings of the Interagency Requirements Review of the Department of Energy (DOE) Environmental Restoration and Waste Management (ERWM) Program. The review was requested by Admiral Watkins to help determine the FY 1993 funding levels necessary to meet all legal requirements. The review was undertaken by analysts from the Office of Management and Budget (OMB) and Army Corps of Engineers, reporting to an Interagency Group (IAG) of senior Administration officials concerned with environmental cleanup issues. The purpose of the study was to determine the level of finding needed in FY 1993 for each ERWM Field Office to comply with all Federal, State, and local government legal requirements; all DOE Orders that establish standards for environment, safety and health (ES and H) management; and for prudent investments in other discretionary and management activities such as upgrading administrative buildings, information systems, etc. The study also reviewed the cost estimates supporting the ERWM proposed budget, including direct costs (labor, equipment) and indirect costs (administrative, landlord services, contractor overhead). The study did not analyze whether the Federal/State legal requirements and DOE Orders were necessary or whether the proposed clean-up remedies represent the most cost effective alternatives available.

1992-04-29T23:59:59.000Z

139

Waste management/waste certification plan for the Oak Ridge National Laboratory Environmental Restoration Program  

Science Conference Proceedings (OSTI)

This Waste Management/Waste Certification (C) Plan, written for the Environmental Restoration (ER) Program at Oak Ridge National Laboratory (ORNL), outlines the criteria and methodologies to be used in the management of waste generated during ORNL ER field activities. Other agreed upon methods may be used in the management of waste with consultation with ER and Waste Management Organization. The intent of this plan is to provide information for the minimization, handling, and disposal of waste generated by ER activities. This plan contains provisions for the safe and effective management of waste consistent with the U.S. Environmental Protection Agency`s (EPA`s) guidance. Components of this plan have been designed to protect the environment and the health and safety of workers and the public. It, therefore, stresses that investigation derived waste (IDW) and other waste be managed to ensure that (1) all efforts be made to minimize the amount of waste generated; (2) costs associated with sampling storage, analysis, transportation, and disposal are minimized; (3) the potential for public and worker exposure is not increased; and (4) additional contaminated areas are not created.

Clark, C. Jr.; Hunt-Davenport, L.D.; Cofer, G.H.

1995-03-01T23:59:59.000Z

140

Draft Waste Management Programmatic Environmental Impact Statement for managing treatment, storage, and disposal of radioactive and hazardous waste. Volume 3, Appendix A: Public response to revised NOI, Appendix B: Environmental restoration, Appendix C, Environmental impact analysis methods, Appendix D, Risk  

Science Conference Proceedings (OSTI)

Volume three contains appendices for the following: Public comments do DOE`s proposed revisions to the scope of the waste management programmatic environmental impact statement; Environmental restoration sensitivity analysis; Environmental impacts analysis methods; and Waste management facility human health risk estimates.

NONE

1995-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "inel environmental restoration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Environmental restoration risk-based prioritization work package planning and risk ranking methodology. Revision 2  

Science Conference Proceedings (OSTI)

This document presents the risk-based prioritization methodology developed to evaluate and rank Environmental Restoration (ER) work packages at the five US Department of Energy, Oak Ridge Field Office (DOE-ORO) sites [i.e., Oak Ridge K-25 Site (K-25), Portsmouth Gaseous Diffusion Plant (PORTS), Paducah Gaseous Diffusion Plant (PGDP), Oak Ridge National Laboratory (ORNL), and the Oak Ridge Y-12 Plant (Y-12)], the ER Off-site Program, and Central ER. This prioritization methodology was developed to support the increased rigor and formality of work planning in the overall conduct of operations within the DOE-ORO ER Program. Prioritization is conducted as an integral component of the fiscal ER funding cycle to establish program budget priorities. The purpose of the ER risk-based prioritization methodology is to provide ER management with the tools and processes needed to evaluate, compare, prioritize, and justify fiscal budget decisions for a diverse set of remedial action, decontamination and decommissioning, and waste management activities. The methodology provides the ER Program with a framework for (1) organizing information about identified DOE-ORO environmental problems, (2) generating qualitative assessments of the long- and short-term risks posed by DOE-ORO environmental problems, and (3) evaluating the benefits associated with candidate work packages designed to reduce those risks. Prioritization is conducted to rank ER work packages on the basis of the overall value (e.g., risk reduction, stakeholder confidence) each package provides to the ER Program. Application of the methodology yields individual work package ``scores`` and rankings that are used to develop fiscal budget requests. This document presents the technical basis for the decision support tools and process.

Dail, J.L.; Nanstad, L.D.; White, R.K.

1995-06-01T23:59:59.000Z

142

Site descriptions of environmental restoration units at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

This report provides summary information on Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) sites as listed in the Oak Ridge Reservation Federal Facility Agreement (FFA), dated January 1, 1992, Appendix C. The Oak Ridge National Laboratory was built in 1943 as part of the World War II Manhattan Project. The original mission of ORNL was to produce and chemically separate the first gram-quantities of plutonium as part of the national effort to produce the atomic bomb. The current mission of ORNL is to provide applied research and development in support of the U.S. Department of Energy (DOE) programs in nuclear fusion and fission, energy conservation, fossil fuels, and other energy technologies and to perform basic scientific research in selected areas of the physical, life, and environmental sciences. ER is also tasked with clean up or mitigation of environmental impacts resulting from past waste management practices on portions of the approximately 37,000 acres within the Oak Ridge Reservation (ORR). Other installations located within the ORR are the Gaseous Diffusion Plant (K-25) and the Y-12 plant. The remedial action strategy currently integrates state and federal regulations for efficient compliance and approaches for both investigations and remediation efforts on a Waste Area Grouping (WAG) basis. As defined in the ORR FFA Quarterly Report July - September 1995, a WAG is a grouping of potentially contaminated sites based on drainage area and similar waste characteristics. These contaminated sites are further divided into four categories based on existing information concerning whether the data are generated for scoping or remedial investigation (RI) purposes. These areas are as follows: (1) Operable Units (OU); (2) Characterization Areas (CA); (3) Remedial Site Evaluation (RSE) Areas; and (4) Removal Site Evaluation (RmSE) Areas.

Kuhaida, A.J. Jr.; Parker, A.F.

1997-02-01T23:59:59.000Z

143

INEL D&D Long-Range Plan  

Science Conference Proceedings (OSTI)

This Long-Range Plan presents the Decontamination and Decommissioning (D&D) Program planning status for facilities at the Idaho National Engineering Laboratory (INEL). The plan provides a general description of the D&D Program objectives, management criteria, and philosophy; discusses current activities; and documents the INEL D&D Program cost and schedule estimate projections for the next 15 years. appendices are included that provide INEL D&D project historical information and a comprehensive descriptive summary of each current surplus facility.

Buckland, R.J.; Kenoyer, D.J.; Preussner, D.H.

1993-10-01T23:59:59.000Z

144

Environmental restoration program pollution prevention checklist guide for the evaluation of alternatives project phase  

SciTech Connect

Evaluation of alternative studies determine what decontamination and decommissioning (D&D) alternatives are presented to regulators for facility and site cleanup. A key consideration in this process is the waste to be generated. Minimizing the volume and toxicity of this waste will ultimately contribute to the selection of the best clean-up option. The purpose of this checklist guide is to assist the user with incorporating pollution prevention/waste minimization (PP/WM) in all Evaluation of Alternatives (EV) phase projects of the Environmental Restoration (ER) Program. This guide will assist users with documenting PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to help users implement and evaluate waste reduction. Users can then establish numerical performance measures to measure progress in planning, training, self-assessments, field implementation, documentation, and technology transfer. Cost savings result as users train and assess themselves, eliminating expensive process waste assessments and audit teams.

Not Available

1993-09-01T23:59:59.000Z

145

Environmental Restoration Program pollution prevention performance measures for FY 1993 and 1994 remedial investigations  

Science Conference Proceedings (OSTI)

The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program adopted a Pollution Prevention Program in March 1991. The program's mission is to minimize waste and prevent pollution in remedial investigations (RI), feasibility studies (FS), decontamination and decommissioning (D D), and surveillance and maintenance (S M) site program activities. Mission success will result in volume and/or toxicity reduction of generated waste. Energy Systems is producing a fully developed a Numerical Scoring System (NSS) and actually scoring the generators of Investigation Derived Waste (IDW) at six ER sites: Oak Ridge National Laboratory (ORNL), the Oak Ridge Y-12 Plant, the Oak Ridge K-25 site, Paducah Gaseous Diffusion Plant (Paducah), and Portsmouth Uranium Enrichment Complex (Portsmouth). This report summarizes the findings of this initial numerical scoring evaluation and shows where improvements in the overall ER Pollution prevention program may be required. This report identifies a number of recommendations that, if implemented, would help to improve site-performance measures. The continued development of the NSS will support generators in maximizing their Pollution Prevention/Waste Minimization efforts. Further refinements of the NSS, as applicable suggest comments and/or recommendations for improvement.

Not Available

1993-03-01T23:59:59.000Z

146

Environmental Restoration Program pollution prevention performance measures for FY 1993 and 1994 remedial investigations  

Science Conference Proceedings (OSTI)

The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program adopted a Pollution Prevention Program in March 1991. The program`s mission is to minimize waste and prevent pollution in remedial investigations (RI), feasibility studies (FS), decontamination and decommissioning (D&D), and surveillance and maintenance (S&M) site program activities. Mission success will result in volume and/or toxicity reduction of generated waste. Energy Systems is producing a fully developed a Numerical Scoring System (NSS) and actually scoring the generators of Investigation Derived Waste (IDW) at six ER sites: Oak Ridge National Laboratory (ORNL), the Oak Ridge Y-12 Plant, the Oak Ridge K-25 site, Paducah Gaseous Diffusion Plant (Paducah), and Portsmouth Uranium Enrichment Complex (Portsmouth). This report summarizes the findings of this initial numerical scoring evaluation and shows where improvements in the overall ER Pollution prevention program may be required. This report identifies a number of recommendations that, if implemented, would help to improve site-performance measures. The continued development of the NSS will support generators in maximizing their Pollution Prevention/Waste Minimization efforts. Further refinements of the NSS, as applicable suggest comments and/or recommendations for improvement.

Not Available

1993-03-01T23:59:59.000Z

147

Performance-Based Environmental Restoration Management Assessment (PERMA): Applying Decision Analysis to Implement Achievable Response-Action Completion Plans  

E-Print Network (OSTI)

Guide is being issued by the Defense Logistics Agency (DLA) to clarify the requirements for implementing the Defense Environmental Restoration Program (DERP) at DLA installations. This Guide reflects DLAs continuing commitment to demonstrate and achieve protectiveness and to meet necessary, feasible, and reasonable environmental response-action obligations in the most effective and efficient manner possible. This Performance-Based Environmental Restoration Management Assessment (PERMA) Guide is designed to assist DLA environmental project teams to achieve response complete in a reasonable timeframe, while maintaining protectiveness of human health and the environment. DLA issues this Guide also to clarify and stress the importance of remedy planning and optimization activities in establishing, reducing, and validating the annual environmental liability statement. The Guide reviews how to establish realistic and achievable performance objectives by taking advantage of the flexibility inherent in the DERP Guidance and the iterative nature of the cleanup program (i.e., fiveyear review process), as directed under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (as amended). Improving scientific and technical knowledge can and should be routinely integrated into the response-action planning and implementation process to ensure that the best responses are used to feasibly and reasonably achieve and efficiently sustain necessary protection.

unknown authors

2004-01-01T23:59:59.000Z

148

Integrated Safety Management System Phase 1 and 2 Verification for the Environmental Restoration Contractor Volumes 1 and 2  

SciTech Connect

DOE Policy 450.4 mandates that safety be integrated into all aspects of the management and operations of its facilities. The goal of an institutionalized Integrated Safety Management System (ISMS) is to have a single integrated system that includes Environment, Safety, and Health requirements in the work planning and execution processes to ensure the protection of the worker, public, environment, and the federal property over the life cycle of the Environmental Restoration (ER) Project. The purpose of this Environmental Restoration Contractor (ERC) ISMS Phase MI Verification was to determine whether ISMS programs and processes were institutionalized within the ER Project, whether these programs and processes were implemented, and whether the system had promoted the development of a safety conscious work culture.

CARTER, R.P.

2000-04-04T23:59:59.000Z

149

Recent INEL spray-forming developments  

SciTech Connect

Spray forming is a near-net-shape fabrication technology in which a spray of finely atomized liquid droplets is deposited onto a suitably shaped substrate or mold to produce a coherent solid. The technology offers unique opportunities for simplifying materials processing, oftentimes while substantially improving product quality. Spray forming can be performed with a wide range of metals and nonmetals, and offersproperty improvements resulting from rapid solidification (eg. refined microstructures, extended solid solubilities and reduced segregation). Economic benefits result from process simplification and the elimination of unit operations. Researchers at the Idaho National Engineering Laboratory (INEL) are developing spray-forming technology for producing near-net-shape solids and coatings of a variety of metals, polymers, and composite materials using de Laval nozzles. Results from several spray-forming programs are presented to illustrate the range of capabilities of the approach as well as the technical and economic benefits. These programs involved the production of low-carbon steel strip and SiC particulate reinforced aluminum strip; recent advances in spray forming tooling using low-melting-point metals are also described.

McHugh, K.M.; Key, J.F.

1992-01-01T23:59:59.000Z

150

Recent INEL spray-forming developments  

SciTech Connect

Spray forming is a near-net-shape fabrication technology in which a spray of finely atomized liquid droplets is deposited onto a suitably shaped substrate or mold to produce a coherent solid. The technology offers unique opportunities for simplifying materials processing, oftentimes while substantially improving product quality. Spray forming can be performed with a wide range of metals and nonmetals, and offersproperty improvements resulting from rapid solidification (eg. refined microstructures, extended solid solubilities and reduced segregation). Economic benefits result from process simplification and the elimination of unit operations. Researchers at the Idaho National Engineering Laboratory (INEL) are developing spray-forming technology for producing near-net-shape solids and coatings of a variety of metals, polymers, and composite materials using de Laval nozzles. Results from several spray-forming programs are presented to illustrate the range of capabilities of the approach as well as the technical and economic benefits. These programs involved the production of low-carbon steel strip and SiC particulate reinforced aluminum strip; recent advances in spray forming tooling using low-melting-point metals are also described.

McHugh, K.M.; Key, J.F.

1992-12-31T23:59:59.000Z

151

Environmental Restoration Program pollution prevention performance measures for FY 1993 and 1994 remedial investigations: Generator training manual  

SciTech Connect

This computer-based program is designed to help waste generators in the Environmental Restoration (ER) Program prevent pollution at the DOE Oak Ridge Field Office (DOE-OR) facilities in Oak Ridge, Paducah, and Portsmouth. The Numerical Scoring System (NSS) is an interactive system designed to maintain data on ER Program pollution prevention efforts and to measure the success of these efforts through the ER Program life cycle.

1993-03-01T23:59:59.000Z

152

Corrective action management unit application for the Environmental Restoration Disposal Facility  

Science Conference Proceedings (OSTI)

The Environmental Restoration Disposal Facility (ERDF) is to accept both CERCLA (EPA-regulated) and RCRA (Ecology-regulated) remediation waste. The ERDF is considered part of the overall remediation strategy on the Hanford Site, and as such, determination of ERDF viability has followed both RCRA and CERCLA decision making processes. Typically, determination of the viability of a unit, such as the ERDF, would occur as part of record of decision (ROD) or permit modification for each remediation site before construction of the ERDF. However, because construction of the ERDF may take a significant amount of time, it is necessary to begin design and construction of the ERDF before final RODs/permit modifications for the remediation sites. This will allow movement of waste to occur quickly once the final remediation strategy for the RCRA and CERCLA past-practice units is determined. Construction of the ERDF is a unique situation relative to Hanford Facility cleanup, requiring a Hanford Facility specific process be developed for implementing the ERDF that would satisfy both RCRA and CERCLA requirements. While the ERDF will play a significant role in the remediation process, initiation of the ERDF does not preclude the evaluation of remedial alternatives at each remediation site. To facilitate this, the January 1994 amendment to the Tri-Party Agreement recognizes the necessity for the ERDF, and the Tri-Party Agreement states: ``Ecology, EPA, and DOE agree to proceed with the steps necessary to design, approve, construct, and operate such a ... facility.`` The Tri-Party Agreement requires the DOE-RL to prepare a comprehensive ``package`` for the EPA and Ecology to consider in evaluating the ERDF. The package is to address the criteria listed in 40 CFR 264.552(c) for corrective action management unit (CAMU) designation and a CERCLA ROD. This CAMU application is submitted as part of the Tri-Party Agreement-required information package.

Evans, G.C.

1994-06-01T23:59:59.000Z

153

Value engineering as applied at the Savannah River Site for environmental restoration projects  

SciTech Connect

Value Engineering (VE) has been defined as the organized study of functions which satisfy the user`s needs at the lowest life cycle costs through applied creativity. VE was established in the World War II era when Mr. Lawrence Miles formed the concept of intentionally substituting materials to perform the function of more expensive standard materials. Since that time, VE has spread throughout the Department of Defense procurement agencies, and has in recent times been applied to almost every government agency. DOE Order 4040.1 states the policy to establish VE programs and use VE, where appropriate, to reduce nonessential costs and improve productivity for Departmental Elements. The order states that these VE programs shall, at a minimum, provide for the management and procurement practices as required by the OMB Circular A-131. Westinghouse Savannah River Company (WSRC), as the prime DOE contractor at the Savannah River Site (SRS), has adopted a policy of applying Value Engineering to all major projects with a Total Estimated Cost (TEC) of $10 million or greater. Projects of a lesser TEC may also have VE studies performed if management has determined that a significant potential exists for cost savings and/or cost avoidance. Within the Environmental Restoration (ER) Department, many of the groundwater remediation and waste site closure project represent individual projects that make up an overall SRS requirement to meet Federal RCRA or CERCLA clean up requirements. Many of these individual projects are not initially considered for VE studies because they never reach the $10 million TEC level. Because many remediation projects are duplicated throughout the site, there is a large potential for cross-link savings throughout the site.

Kupar, J.J.; Morgenstern, M.R.; Richardson, J.E.

1991-12-31T23:59:59.000Z

154

Value engineering as applied at the Savannah River Site for environmental restoration projects  

Science Conference Proceedings (OSTI)

Value Engineering (VE) has been defined as the organized study of functions which satisfy the user's needs at the lowest life cycle costs through applied creativity. VE was established in the World War II era when Mr. Lawrence Miles formed the concept of intentionally substituting materials to perform the function of more expensive standard materials. Since that time, VE has spread throughout the Department of Defense procurement agencies, and has in recent times been applied to almost every government agency. DOE Order 4040.1 states the policy to establish VE programs and use VE, where appropriate, to reduce nonessential costs and improve productivity for Departmental Elements. The order states that these VE programs shall, at a minimum, provide for the management and procurement practices as required by the OMB Circular A-131. Westinghouse Savannah River Company (WSRC), as the prime DOE contractor at the Savannah River Site (SRS), has adopted a policy of applying Value Engineering to all major projects with a Total Estimated Cost (TEC) of $10 million or greater. Projects of a lesser TEC may also have VE studies performed if management has determined that a significant potential exists for cost savings and/or cost avoidance. Within the Environmental Restoration (ER) Department, many of the groundwater remediation and waste site closure project represent individual projects that make up an overall SRS requirement to meet Federal RCRA or CERCLA clean up requirements. Many of these individual projects are not initially considered for VE studies because they never reach the $10 million TEC level. Because many remediation projects are duplicated throughout the site, there is a large potential for cross-link savings throughout the site.

Kupar, J.J.; Morgenstern, M.R.; Richardson, J.E.

1991-01-01T23:59:59.000Z

155

Oak Ridge Reservation Federal Facility Agreement for the Environmental Restoration Program. Volume 4. Quarterly report, July--September 1993  

SciTech Connect

This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered is July through September 1993 (fourth quarter of FY 1993). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments.

Not Available

1993-10-01T23:59:59.000Z

156

Oak Ridge Reservation Federal Facility Agreement. Quarterly report for the Environmental Restoration Program. Volume 4, July 1995--September 1995  

Science Conference Proceedings (OSTI)

This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered herein is July through September 1995 (fourth quarter of FY 1995). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995 commitments.

NONE

1995-10-01T23:59:59.000Z

157

Oak Ridge reservation federal facility agreement for the Environmental Restoration Program. Volume 1. Quarterly report, October--December 1993  

Science Conference Proceedings (OSTI)

This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered is October through December 1993 (first quarter of FY 1994). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments.

Not Available

1994-01-01T23:59:59.000Z

158

Accident analysis for high-level waste management alternatives in the US Department of Energy Environmental Restoration and Waste Management Programmatic Environmental Impact Statement  

SciTech Connect

A comparative generic accident analysis was performed for the programmatic alternatives for high-level waste (HLW) management in the US Department of Energy Environmental Restoration and Waste Management Programmatic Environmental Impact Statement (EM PEIS). The key facilities and operations of the five major HLW management phases were considered: current storage, retrieval, pretreatment, treatment, and interim canister storage. A spectrum of accidents covering the risk-dominant accidents was analyzed. Preliminary results are presented for HLW management at the Hanford site. A comparison of these results with those previously advanced shows fair agreement.

Folga, S.; Mueller, C.; Roglans-Ribas, J.

1994-02-01T23:59:59.000Z

159

Track 2 sites: Guidance for assessing low probability hazard sites at the INEL. Revision 6  

SciTech Connect

This document presents guidance for assessment of Track 2 low probability hazard sites (LPHS) at the Idaho National Engineering Laboratory (INEL). The Track 2 classification was developed specifically for the INEL to streamline the implementation of Comprehensive Environmental Response, Compensation, and Liability Act. Track 2 LPHSs are described as sites where insufficient data are available to make a decision concerning the risk level or to select or design a remedy. As such, these types of sites are not described in the National Contingency Plan or existing regulatory guidance. The goal of the Track 2 process is to evaluate LPHSs using existing qualitative and quantitative data to minimize the collection of new environmental data. To this end, this document presents a structured format consisting of a series of questions and tables. A qualitative risk assessment is used. The process is iterative, and addresses an LPHS from multiple perspectives (i.e., historical, empirical, process) in an effort to generate a reproducible and defensible method. This rigorous approach follows the data quality objective process and establishes a well organized, logical approach to consolidate and assess existing data, and set decision criteria. If necessary, the process allows for the design of a sampling and analysis strategy to obtain new environmental data of appropriate quality to support decisions for each LPHS. Finally, the guidance expedites consensus between regulatory parties by emphasizing a team approach to Track 2 investigations.

Not Available

1994-01-01T23:59:59.000Z

160

Oak Ridge Reservation Federal Facility Agreement quarterly report for the environmental restoration program. Volume 3: April--June 1995  

Science Conference Proceedings (OSTI)

This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995 commitments. The report describes the technical status of the following: Y-12 Plant; Oak Ridge National Lab; K-25 Plant; and Oak Ridge Reservation boundary areas. The report also describes technical programs, namely: the Oak Ridge environmental information system, remote sensing and special survey program, and the risk assessment program.

NONE

1995-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "inel environmental restoration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Oak Ridge Reservation Federal Facility Agreement for the Environmental Restoration Program. Volume 1, Quarterly report, October--December 1995  

Science Conference Proceedings (OSTI)

This Oak Ridge Reservation Federal Facility Agreement Quarterly Report for the Environmental Restoration Program was prepared to satisfy requirements for progress reporting on Environmental Restoration Program (ER) activities as specified in the Oak Ridge Reservation Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency, and the Tennessee Department of Environment and Conservation. The reporting period covered in this document is October through December 1995. This work was performed under Work Breakdown Structure 1.4.12.2.3.04 (Activity Data Sheet 8304). Publication of this document meets two FFA milestones. The FFA Quarterly Report meets an FFA milestone defined as 30 days following the end of the applicable reporting period. Appendix A of this report meets the FFA milestone for the Annual Removal Action Report for the period FYs 1991--95. This document provides information about ER Program activities conducted on the Oak Ridge Reservation under the FFA. Specifically, it includes information on milestones scheduled for completion during the reporting period, as well as scheduled for completion during the next reporting period (quarter); accomplishments of the ER Program; concerns related to program work; and scheduled activities for the next quarter. It also provides a listing of the identity and assigned tasks of contractors performing ER Program work under the FFA.

NONE

1996-01-01T23:59:59.000Z

162

Oak Ridge Reservation Federal Facility agreement quarterly report for the Environmental Restoration Program, January--March 1994. Volume 2  

Science Conference Proceedings (OSTI)

This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered herein is January through March 1994 (second quarter of FY 1994). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments. Section 2 covers significant accomplishments. Section 3 discusses technical status at the Oak Ridge Y-12 Plant, Oak Ridge National Laboratory, Oak Ridge K-25 Site, and Clinch River. Technical oversight and technical programs are also covered. Section 4 covers responds action contractor assignments.

Not Available

1994-04-01T23:59:59.000Z

163

Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs draft environmental impact statement. Summary  

Science Conference Proceedings (OSTI)

This document analyzes at a programmatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For programmatic spent nuclear fuel management, this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum treatment, storage, and disposal of US Department of Energy wastes.

Not Available

1994-06-01T23:59:59.000Z

164

Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 2, Part A  

SciTech Connect

This document analyzes at a programmatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For programmatic spent nuclear fuel management this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum and maximum treatment, storage, and disposal of US Department of Energy wastes.

1994-06-01T23:59:59.000Z

165

Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 1  

Science Conference Proceedings (OSTI)

This document analyzes at a pregrammatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For pregrammatic spent nuclear fuel management, this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum treatment, storage, and disposal of US Department of Energy wastes.

Not Available

1994-06-01T23:59:59.000Z

166

Third annual environmental restoration monitoring and assessment report for FY 1994 of the Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect

This report summarizes the salient features of the annual efforts of environmental monitoring, field investigations, and assessments conducted to support the Environmental Restoration (ER) Program at the Oak Ridge National Laboratory (ORNL). This report focuses on the watershed scale, providing an ORNL site-wide perspective on types, distribution, and transport of contamination. The results presented are used to enhance the conceptual understanding of the key contaminants and the sources, fluxes, and processes affecting their distribution and movement. This information forms a basis for prioritizing sites and for selecting, implementing, and evaluating remedial actions. This report summarizes the efforts of the Waste Area Grouping (WAG) 2 and Site Investigations (SI) Project. WAG 2 is the lower portion of the White Oak Creek system which drains the major contaminated sites at ORNL and discharges to the Clinch River where public access is allowed. The Remedial Investigation Plan (DOE 1992) for WAG 2 includes a long-term multimedia environmental monitoring effort that takes advantage of WAG 2`s role as an integrator and the major conduit of contaminants from the ORNL site. During FY 1992, the remedial investigation activities were integrated with a series of environmental monitoring and SI activities at ORNL that address pathways and processes important for contaminant movement to gain a more integrated perspective of contamination movement at the watershed scale.

Clapp, R.B.; Watts, J.A.; Guth, M.A.S. [eds.

1994-09-01T23:59:59.000Z

167

Computer modeling of jet mixing in INEL waste tanks  

SciTech Connect

The objective of this study is to examine the feasibility of using submerged jet mixing pumps to mobilize and suspend settled sludge materials in INEL High Level Radioactive Waste Tanks. Scenarios include removing the heel (a shallow liquid and sludge layer remaining after tank emptying processes) and mobilizing and suspending solids in full or partially full tanks. The approach used was to (1) briefly review jet mixing theory, (2) review erosion literature in order to identify and estimate important sludge characterization parameters (3) perform computer modeling of submerged liquid mixing jets in INEL tank geometries, (4) develop analytical models from which pump operating conditions and mixing times can be estimated, and (5) analyze model results to determine overall feasibility of using jet mixing pumps and make design recommendations.

Meyer, P.A.

1994-01-01T23:59:59.000Z

168

Expanded public notice: Washington State notice of intent for corrective action management unit, Hanford Environmental Restoration Disposal  

SciTech Connect

This document is to serve notice of the intent to operate an Environmental Restoration Disposal Facility (ERDF), adjacent to the 200 West Area of the Hanford Facility, Richland, Washington, as a Corrective Action Management Unit (CAMU), in accordance with 40 Code of Federal Regulation (CFR) 264.552. The ERDF CAMU will serve as a management unit for the majority of waste (primarily soil) excavated during remediation of waste management sites on the Hanford Facility. Only waste that originates from the Hanford Facility can be accepted in this ERDF CAMU. The waste is expected to consist of dangerous waste, radioactive waste, and mixed waste. Mixed waste contains radioactive and dangerous components. The primary features of the ERDF could include the following: one or more trenches, rail and tractor/trailer container handling capability, railroads, an inventory control system, a decontamination building, and operational offices.

Not Available

1994-01-01T23:59:59.000Z

169

ANL Technical Support Program for DOE Environmental Restoration and Waste Management; Annual report, October 1992--September 1993  

SciTech Connect

This report is an overview of the progress during FY 1993 for the Technical Support Program that is part of the ANL Technology Support Activity for DOE Environmental Restoration and Waste Management (EM). The purpose is to evaluate, before hot start-up of the Defense Waste Processing Facility (DWPF) and the West Valley Demonstration Project (WVDP), factors that are anticipated to affect glass reaction in an unsaturated environment typical of what may be expected for the candidate Yucca Mountain repository site. Specific goals for the testing program include the following: reviewing and evaluating available data on parameters that will be important in establishing the long-term performance of glass in a repository environment; performing tests to further quantify the effects of important variables where there are deficiencies in the available data; and initiating long-term tests to determine glass performance under a range of conditions applicable to repository disposal.

Bates, J.K.; Bourcier, W.L.; Bradley, C.R. [and others

1994-06-01T23:59:59.000Z

170

Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 499: Hydrocarbon Spill Site, Tonopah Test Range, Nevada  

SciTech Connect

This Streamlined Approach for Environmental Restoration (SAFER) plan addresses the action necessary for the closure of Corrective Action Unit (CAU) 499, Hydrocarbon Spill Site, Tonopah Test Range (TTR). This CAU is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996). CAU 499 is located on the TTR and consists of the following single Corrective Action Site (CAS) (Figure 1): CAS RG-25-001-RD24 - Radar 24 Diesel Spill Site is a diesel fuel release site that is assumed to have been cased by numerous small historical over fillings, spills and leaks from an above-ground storage tank (AST) over a period of 36 years. The tank was located on the north side of Building 24-50 on the TTR approximately 4.0 kilometers (2.5 miles) southwest of the Area 3 Compound at the end of the Avenue 24.

T. M. Fitzmaurice

2001-09-01T23:59:59.000Z

171

Streamlined approach for environmental restoration plan, CAU No. 400: Bomblet Pit and Five Points landfill Tonopah test range  

SciTech Connect

This plan was prepared under the Streamlined Approach for Environmental Restoration (SAFER) concept. The SAFER process is employed at Corrective Action Units (CAUs) where enough information exists about the nature and extent of contamination to propose an appropriate corrective action prior to the implementation of a Corrective Action Investigation (CAI). This process combines elements of the Data Quality Objectives (DQO) process and the observational approach to help plan and conduct corrective actions. DQOs are used to identify the problem and define the type and quality of data needed to complete the investigation phase of the process. The observational approach provides a framework for managing uncertainty and planning decision-making. The purpose of the investigation in the SAFER process is to document and verify the adequacy of existing information (such as process knowledge); to affirm the decision for clean closure, closure in place, or to take no further action; and to provide sufficient data to implement the corrective action.

NONE

1996-04-01T23:59:59.000Z

172

ANL Technical Support Program for DOE Environmental Restoration and Waste Management. Annual report, October 1990--September 1991  

SciTech Connect

This report provides an overview of progress during FY 1991 for the Technical Support Program that is part of the ANL Technology Support Activity for DOE, Environmental Restoration and Waste Management (EM). The purpose is to evaluate, before hot start-up of the Defenses Waste Processing Facility (DWPF) and the West Valley Demonstration Project (WVDP), factors that are likely to affect glass reaction in an unsaturated environment typical of what may be expected for the candidate Yucca Mountain repository site. Specific goals for the testing program include the following: (1) to review and evaluate available information on parameters that will be important in establishing the long-term performance of glass in a repository environment; (2) to perform testing to further quantify the effects of important variables where there are deficiencies in the available data; and (3) to initiate long-term testing that will bound glass performance under a range of conditions applicable to repository disposal.

Bates, J.K.; Bradley, C.R.; Buck, E.C.; Cunnane, J.C.; Dietz, N.L.; Ebert, W.L.; Emery, J.W.; Feng, X.; Gerding, T.J.; Gong, M.; Hoh, J.C.; Mazer, J.J.; Wronkiewicz, D.J. [Argonne National Lab., IL (United States); Bourcier, W.L.; Morgan, L.E.; Nielsen, J.K.; Steward, S.A. [Lawrence Livermore National Lab., CA (United States); Ewing, R.C.; Wang, L.M. [New Mexico Univ., Albuquerque, NM (United States); Han, W.T.; Tomozawa, M. [Rensselaer Polytechnic Inst., Troy, MI (United States)

1992-03-01T23:59:59.000Z

173

The development and application of a risk-based prioritization model for the Oak Ridge Environmental Restoration Program  

Science Conference Proceedings (OSTI)

The Oak Ridge Environmental Restoration (ER) Program developed and implemented the Environmental Restoration Benefit Assessment Matrix (ERBAM) early in 1994 to provide a simple, efficient process for prioritizing and justifying fiscal budget decisions for a diverse set of activities. The decision to develop a methodology for prioritizing sites was necessitated by the large number of buildings and areas managed by the DOE Oak Ridge Field Office and the finite resources available to address these areas. The ERBAM was based on the Integrated Resource Management System prioritization methodology historically used by the United States Department of Energy (DOE) and Lockheed Martin Energy Systems, Inc., to rank compliance and operational activities. To develop the matrix, ER Program management, working with federal and state regulators, agreed on impact criteria that balance the major objectives within the ER Program: protection of public health, protection of the environment, protection of on-site workers, consideration of stakeholder/community preference, achievement of ER mission, and optimization of cost efficiency. Lessons learned from the initial application of the matrix were used to make refinements and improvements in the methodology. A standard set of assumptions (both overall and categoric) and a prioritization board, consisting of top level DOE and Lockheed Martin Energy Systems, Inc., managers along with federal and state regulatory representatives, were established to facilitate consistent application. Current and future improvements include a method to incorporate existing quantitative risk data and facilitate increased efficiency in applying baseline cost data and approved funding levels to the prioritized output. Application of the prioritization methodology yields a prioritized list of all work activities within the programs` work breakdown structure.

Dail, J.L.; White, R.K.

1995-12-31T23:59:59.000Z

174

Technologies development for environmental restoration and waste management: International university and research institution and industry partnerships  

SciTech Connect

The Institute for Central and Eastern European Cooperative Environmental Research (ICEECER) at Florida State University was formed in 1990 soon after the end of the Cold War. ICEECER consists of a number of joint centers which link FSU, and US as well as international funding agencies, to academic and research institutions in Hungary, Poland, the Czech Republic, Russia, and the other countries of Central and Eastern Europe and the Newly Independent States. Areas of interest include risk assessment, toxicology, contaminated site remediation/characterization, waste management, emergency response, environmental technology development/demonstration/transfer, and some specialized areas of research (e.g., advanced chemical separations). Through ICEECER, numerous international conferences, symposia, training courses, and workshops have also been conducted on a variety of environmental topics. This paper summarizes the mission, structure, and administration of ICEECER and provides information on the projects conducted through this program at FSU.

Herndon, R.C.; Moerlins, J.E.; Kuperberg, J.M.

1996-12-31T23:59:59.000Z

175

INEL test plan for evaluating waste assay systems  

SciTech Connect

A test bed is being established at the Idaho National Engineering Laboratory (INEL) Radioactive Waste Management Complex (RWMC). These tests are currently focused on mobile or portable radioassay systems. Prior to disposal of TRU waste at the Waste Isolation Pilot Plant (WIPP), radioassay measurements must meet the quality assurance objectives of the TRU Waste Characterization Quality Assurance Program Plan. This test plan provides technology holders with the opportunity to assess radioassay system performance through a three-tiered test program that consists of: (a) evaluations using non-interfering matrices, (b) surrogate drums with contents that resemble the attributes of INEL-specific waste forms, and (c) real waste tests. Qualified sources containing a known mixture and range of radionuclides will be used for the non-interfering and surrogate waste tests. The results of these tests will provide technology holders with information concerning radioassay system performance and provide the INEL with data useful for making decisions concerning alternative or improved radioassay systems that could support disposal of waste at WIPP.

Mandler, J.W.; Becker, G.K.; Harker, Y.D.; Menkhaus, D.E.; Clements, T.L. Jr.

1996-09-01T23:59:59.000Z

176

Basic science and its relationship to environmental restoration: Preparing for the 21. century. Summary report  

SciTech Connect

The Department of Energy (DOE) funded the two day meeting in order to focus on ways to organize and mobilize the scientific community to effectively address the maze of global environmental problems. Using the Office of Energy Research (ER) as a Test Case, the participants were asked to address such questions as: What are the problems ER can effectively address? Is there a hierarchy of issues involved in attacking those problems? Are there new multi-disciplinary constructs that should be encouraged in the university environment, much like the applied science departments that developed at many institutions in the 1970`s and 1980`s; and/or in the national laboratories? What does it take to get the best minds in the university and national laboratory environments actively engaged in investigations of fundamental environmental problems? If such a beginning can be made, how should its significance be communicated to other agencies?

1995-12-31T23:59:59.000Z

177

Advanced, Environmentally Friendly Hydroelectric Turbines for the Restoration of Fish and Water Quality  

DOE Green Energy (OSTI)

Hydroelectric power contributes about 10 percent of the electrical energy generated in the United States, and nearly 20 percent of the world?s electrical energy. The contribution of hydroelectric generation has declined in recent years, often as a consequence of environmental concerns centering around (1) restriction of upstream and downstream fish passage by the dam, and (2) alteration of water quality and river flows by the impoundment. The Advanced Hydropower Turbine System (AHTS) Program of the U.S. Department of Energy is developing turbine technology which would help to maximize global hydropower resources while minimizing adverse environmental effects. Major technical goals for the Program are (1) the reduction of mortality among turbine-passed fish to 2 percent or less, compared to current levels ranging up to 30 percent or greater; and (2) development of aerating turbines that would ensure that water discharged from reservoirs has a dissolved oxygen concentration of at least 6 mg/L. These advanced, ?environmentally friendly? turbines would be suitable both for new hydropower installations and for retrofitting at existing dams. Several new turbine designs that have been he AHTS program are described.

Brookshier, P.A.; Cada, G.F.; Flynn, J.V.; Rinehart, B.N.; Sale, M.J.; Sommers, G.L.

1999-09-06T23:59:59.000Z

178

ERRATA Sheet for ''Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 425: Area 9 Main Lake Construction Debris Disposal Area, Tonopah Test Range, Nevada''  

Science Conference Proceedings (OSTI)

In Appendix A the second sentence of the first paragraph on Page A-1-1 of the Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 425: Area 9 Main Lake Construction Debris Disposal Area, Tonopah Test Range, Nevada, erroneously cites the EPA DQO guidance outline as (EPA, 1994). The correct citation is (EPA, 2000).

K. B. Campbell

2003-03-01T23:59:59.000Z

179

FY 1994 annual summary report of the surveillance and maintenance activities for the Oak Ridge National Laboratory Environmental Restoration Program  

Science Conference Proceedings (OSTI)

The Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Surveillance and Maintenance (S and M) Program was initiated to manage former waste management and environmental research sites contaminated with radioactive materials and/or hazardous chemicals. The S and M Program is responsible for managing designated sites/facilities from the end of their operating lives until final disposition or site stabilization. To effectively manage and perform the various S and M Program responsibilities, five summary-level work breakdown structure (WBS) elements have been established: S and M Preliminary Investigations, Special Projects, Routine S and M, Inactive Groundwater Wells, and Project Management. Routine S and M activities were conducted as scheduled throughout fiscal years (FY) 1994 at applicable inactive waste management (WM) and other contaminated areas. Overall, the ER S and M Program maintains 47 facilities, performs vegetation maintenance on approximately 230 acres, maintains 54 inactive tanks, and provides overall site management on over 700 acres. In addition to the routine S and M activities, detailed site inspections were conducted at established frequencies on appropriate sites in the ER S and M Program. This document provides a summary of the FY 1994 ORNL ER S and M Program accomplishments.

Not Available

1994-11-01T23:59:59.000Z

180

Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 574: Neptune, Nevada National Security Site, Nevada  

SciTech Connect

This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for closure of Corrective Action Unit (CAU) 574, Neptune. CAU 574 is included in the Federal Facility Agreement and Consent Order (FFACO) (1996 [as amended March 2010]) and consists of the following two Corrective Action Sites (CASs) located in Area 12 of the Nevada National Security Site: (1) CAS 12-23-10, U12c.03 Crater (Neptune); (2) CAS 12-45-01, U12e.05 Crater (Blanca). This plan provides the methodology for the field activities that will be performed to gather the necessary information for closure of the two CASs. There is sufficient information and process knowledge regarding the expected nature and extent of potential contaminants to recommend closure of CAU 574 using the SAFER process. Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, field screening, analytical results, the results of the data quality objective (DQO) process (Section 3.0), and an evaluation of corrective action alternatives (Appendix B), closure in place with administrative controls is the expected closure strategy for CAU 574. Additional information will be obtained by conducting a field investigation to verify and support the expected closure strategy and provide a defensible recommendation that no further corrective action is necessary. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.

NSTec Environmental Restoration

2011-08-31T23:59:59.000Z

Note: This page contains sample records for the topic "inel environmental restoration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Savannah River Site`s Site Specific Plan. Environmental restoration and waste management, fiscal year 1992: Executive summary  

SciTech Connect

This report describes the environmental restoration and waste management (ER/WM) planning process, communicates ER/WM`s philosophy and overall strategy for achieving its compliance and cleanup goals, summarizes multi-year program plans and assesses progress made during the previous year. The FYP goal is to ensure that risks to human health and safety and to the environment posed by the Department`s past, present, and future operations are either eliminated to reduced to safer levels by the year 2019. The SSP applies the overall strategic goals and commitments of the FYP, incorporating site-specific and local public considerations. It will address accomplishments since the FY 1990 plan, document planned activities focused on the upcoming fiscal year (FY 1992) and discuss milestones and objectives based on restricted and nonrestricted budget conditions for FY 1993--1997. The SSP is the primary means of demonstrating the relationship of local cleanup and compliance activities to broad environmental goals set forth in the FYP. The SSP provides an important channel for conveying information to regulators, the public, special interest groups, and other DOE organizations. This summary will briefly review the site`s facilities and missions, current and future program objectives, major accomplishments, funding levels, and major milestones for the five-year period.

1991-08-01T23:59:59.000Z

182

Nuclear Operations Application to Environmental Restoration at Corrective Action Unit 547, Miscellaneous Contaminated Waste Sites, at the Nevada National Security Site  

SciTech Connect

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office has responsibility for environmental restoration at the Nevada National Security Site (formerly the Nevada Test Site). This includes remediation at locations where past testing activities have resulted in the release of plutonium to the environment. One of the current remediation efforts involves a site where an underground subcritical nuclear safety test was conducted in 1964. The underground test was vented through a steel pipe to the surface in a closed system where gas samples were obtained. The piping downstream of the gas-sampling apparatus was routed belowground to a location where it was allowed to vent into an existing radioactively contaminated borehole. The length of the pipe above the ground surface is approximately 200 meters. This pipe remained in place until remediation efforts began in 2007, at which time internal plutonium contamination was discovered. Following this discovery, an assessment was conducted to determine the quantity of plutonium present in the pipe. This site has been identified as Corrective Action Unit (CAU) 547, Miscellaneous Contaminated Waste Sites. The quantity of plutonium identified at CAU 547 exceeded the Hazard Category 3 threshold but was below the Hazard Category 2 threshold specified in DOE Standard DOE-STD-1027-92. This CAU, therefore, was initially categorized as a Hazard Category 3 environmental restoration site. A contaminated facility or site that is initially categorized as Hazard Category 3, however, may be downgraded to below Hazard Category 3 if it can be demonstrated through further analysis that the form of the material and the energy available for release support reducing the hazard category. This is an important consideration when performing hazard categorization of environmental restoration sites because energy sources available for release of material are generally fewer at an environmental restoration site than at an operating facility and environmental restoration activities may result in the complete removal of source material.

Kevin Cabble (NSO), Mark Krauss and Patrick Matthews (N-I)

2011-03-03T23:59:59.000Z

183

International technology catalogue: Foreign technologies to support the environmental restoration and waste management needs of the DOE complex  

SciTech Connect

This document represents a summary of 27 foreign-based environmental restoration and waste management technologies that have been screened and technically evaluated for application to the cleanup problems of the Department of Energy (DOE) nuclear weapons complex. The evaluation of these technologies was initiated in 1992 and completed in 1995 under the DOE`s International Technology Coordination Program of the Office of Technology Development. A methodology was developed for conducting a country-by-country survey of several regions of the world where specific environmental technology capabilities and market potential were investigated. The countries that were selected from a rank-ordering process for the survey included: then West Germany, the Netherlands, France, Japan, Taiwan, the Czech and Slovak Republics, and the Former Soviet Union. The notably innovative foreign technologies included in this document were screened initially from a list of several hundred, and then evaluated based on criteria that examined for level of maturity, suitability to the DOE needs, and for potential cost effective application at a DOE site. Each of the selected foreign technologies that were evaluated in this effort for DOE application were subsequently matched with site-specific environmental problem units across the DOE complex using the Technology Needs Assessment CROSSWALK Report. For ease of tracking these technologies to site problem units, and to facilitate their input into the DOE EnviroTRADE Information System, they were categorized into the following three areas: (1) characterization, monitoring and sensors, (2) waste treatment and separations, and (3) waste containment. Technical data profiles regarding these technologies include title and description, performance information, development status, key regulatory considerations, intellectual property rights, institute and contact personnel, and references.

Matalucci, R.V. [ed.] [Sandia National Labs., Albuquerque, NM (United States). International Programs Dept.; Jimenez, R.D.; Esparza-Baca, C. [ed.] [Applied Sciences Lab., Inc., Albuquerque, NM (United States)

1995-07-01T23:59:59.000Z

184

S M Stoller Pinellas Environmental Restoration Project - Young - Rainey Star Center  

Office of Legacy Management (LM)

Young - Rainey Star Center Young - Rainey Star Center 110406202 Accutest Job Number: F30886 Sampling Date: 04/06/05 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable. Harry Behzadi, Ph.D.

185

S M Stoller Pinellas Environmental Restoration Project - Young - Rainey Star Center  

Office of Legacy Management (LM)

Young - Rainey Star Center Young - Rainey Star Center 110406202 Accutest Job Number: F35489 Sampling Date: 10/05/05 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable. Harry Behzadi, Ph.D.

186

Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program  

Science Conference Proceedings (OSTI)

This site management plan for the Oak Ridge Reservation (ORR) describes the overall approach for addressing environmental contamination problems at the ORR Superfund site located in eastern Tennessee. The ORR consists of three major US Department of Energy (DOE) installations constructed in the early to mid 1940s as research, development, and process facilities in support of the Manhattan Project. In addition to the three installations -- Oak Ridge National Laboratory (ORNL), the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site (formerly the Oak Ridge Gaseous Diffusion Plant) -- the ORR Superfund Site also includes areas outside the installations, land used by the Oak Ridge Associated Universities and waterways that have been contaminated by releases from the DOE installations. To date, {approximately} 400 areas (Appendix A) requiring evaluation have been identified. Cleanup of the ORR is expected to take two to three decades and cost several billion dollars. This site management plan provides a blueprint to guide this complex effort to ensure that the investigation and cleanup activities are carried out in an efficient and cost-effective manner.

Not Available

1994-06-01T23:59:59.000Z

187

Oak Ridge Reservation site management plan for the environmental restoration program  

SciTech Connect

This report describes the overall approach for addressing environmental contamination on the Oak Ridge Reservation (ORR) National Priorities List site located in east Tennessee. The cleanup strategy reflected in this site management plan (SMP) has been developed to accelerate the transition of areas of concern (AOCs) from characterization to remediation by making decisions at the watershed scale based on recommended land uses. Project scoping involves the use of defined remedial action objectives, which are based in part on the land uses selected for the project sites. To provide a consistent land use approach that accommodates the needs of all stakeholders responsible for the remediation and reutilization of the ORR, a reservation-wide strategy has been developed. The Common Ground process is a stakeholder-driven process to determine preferred land use options for the ORR so that clean-up operations will be based on the most likely and acceptable land uses. DOE utilized the information gathered in the Common Ground process to recommend desired land uses for the ORR. The land uses recommended by DOE as a result of the Common Ground process are being used for planning land and facility use/reuse for the next 25 years. Land uses recommended for the ORR in conducting CERCLA remedial activities are conservation, industrial use, and waste management.

NONE

1995-09-01T23:59:59.000Z

188

Sampling and analysis of the inactive waste tanks TH-2, WC-1, and WC-15. Environmental Restoration Program  

Science Conference Proceedings (OSTI)

Thirty-eight inactive liquid low-level radioactive waste tanks are currently managed by the Environmental Restoration Program of Oak Ridge National Laboratory. The contents of these tanks are to be characterized in preparation for future corrective actions and remediation activities as part of compliance with the pending Federal Facility Agreement for the Oak Ridge Reservation. Twenty-nine of these tanks were sampled and analyzed in 1989. Three of the tanks (TH-2, WC-1, and WC-15) were not accessible from the surface and thus were not sampled until 1990. This report presents the sampling and analytical results of that campaign. All three tanks in this report had negligible regulatory organic compounds in the samples that were collected. There were no US Environmental Protection Agency (EPA) Target Compound List (TCL) constituents for volatile organics detected in any of the aqueous samples. The only semivolatile organics detected were 2-chlorophenol (52 {mu}g/L) in tank TH-2 and dichloroethane (14--15 {mu}g/L) and diethyl either (15--17 {mu}g/L) in tank WC-15. A thin oil layer was discovered floating on top of the aqueous contents in tank WC-15. The analysis of the oil layer detected no volatile organics and showed only one EPA TCL constituent, di-n-butylphthalate, at 1900 {mu}g/L. Low levels of Resource Conservation and Recovery Act (RCRA) metals were observed in the samples from tank TH-2, but only the mercury level exceeded the RCRA limit. Samples from tank WC-1 had elevated levels of the RCRA metals barium, chromium, and lead. There were also finely suspended particles in one of the samples from tank WC-1, which was filtered and analyzed separately. This solid fines have levels of transuranium elements {sup 238}Pu and {sup 241}Am high enough to classified as transuranic waste.

Autrey, J.W.; Keller, J.M.; Griest, W.H.; Botts, J.L.; Schenley, R.L.; Sipe, M.A.

1992-02-01T23:59:59.000Z

189

Waste generation forecast for DOE-ORO`s Environmental Restoration OR-1 Project: FY 1995-FY 2002, September 1994 revision  

Science Conference Proceedings (OSTI)

A comprehensive waste-forecasting task was initiated in FY 1991 to provide a consistent, documented estimate of the volumes of waste expected to be generated as a result of U.S. Department of Energy-Oak Ridge Operations (DOE-ORO) Environmental Restoration (ER) OR-1 Project activities. Continual changes in the scope and schedules for remedial action (RA) and decontamination and decommissioning (D&D) activities have required that an integrated data base system be developed that can be easily revised to keep pace with changes and provide appropriate tabular and graphical output. The output can then be analyzed and used to drive planning assumptions for treatment, storage, and disposal (TSD) facilities. The results of this forecasting effort and a description of the data base developed to support it are provided herein. The initial waste-generation forecast results were compiled in November 1991. Since the initial forecast report, the forecast data have been revised annually. This report reflects revisions as of September 1994.

Not Available

1994-12-01T23:59:59.000Z

190

Surface debris inventory at White Wing Scrap Yard, Oak Ridge Reservation, Oak Ridge, Tennessee. Environmental Restoration Program  

SciTech Connect

An inventory of surface debris in designated grid blocks at the White Wing Scrap Yard [Waste Area Grouping 11 (WAG 11)] was conducted intermittently from February through June 1992 by members of the Measurement Applications and Development Group, Health and Safety Research Division, Oak Ridge National Laboratory (ORNL) at the request of ORNL Environmental Restoration (ER) Program personnel. The objectives of this project are outlined in the following four phases: (1) estimate the amount (volume) and type (e.g., glass, metal and plastics) of surface waste material in 30 designated grid blocks (100- by 100-ft grids); (2) conduct limited air sampling for organic chemical pollutants at selected locations (e.g., near drums, in holes, or other potentially contaminated areas); (3) conduct a walkover gamma radiation scan extending outward (approximately 50 ft) beyond the proposed location of the WAG 11 perimeter fence; and (4) recommend one grid block as a waste staging area. This recommendation is based on location and accessibility for debris staging/transport activities and on low levels of gamma radiation in the grid block.

Rodriguez, R.E.; Tiner, P.F.; Williams, J.K.

1992-08-01T23:59:59.000Z

191

Strategic Environmental Research and Development Project FY 1994: Assessing national remote sensing technologies for use in US Department of Energy Environmental Restoration Activities, Oak Ridge Solid Waste Storage Area 4 case study  

SciTech Connect

During FY 1994, the Oak Ridge Environmental Restoration (ER) Remote Sensing Program teamed with members of the Oak Ridge National Security Program Office (NSPO), the Environmental Research Institute of Michigan (ERIM) under contract to the National Exploitation Laboratory (NEL), the Oak Ridge Waste Area Group 4 (WAG 4) ER Program, and the US Department of Energy (DOE), Offices of Technology Development, Nonproliferation and National Security, and Environmental Restoration, to conduct a test and demonstration of the uses of national remote sensing technologies at DOE hazardous waste sites located in Oak Ridge, Tennessee. Objectives of the Oak Ridge study were to determine if national remote sensing technologies are useful in conducting prescreening, characterization, and/or monitoring activities to expedite the clean-up process at hazardous waste sites and to cut clean-up costs wherever possible. This project was sponsored by the Strategic Environmental Research and Development Project (SERDP).

King, A.L.; Smyre, J.L.; Evers, T.K.

1995-02-01T23:59:59.000Z

192

Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program  

Science Conference Proceedings (OSTI)

This program management plan describes the scope, objectives, and method of accomplishment for the Martin Marietta Energy Systems, Inc. (Energy Systems) Oak Ridge National laboratory (ORNL) Environmental Restoration (ER) Program. The ORNL ER Program is one of five site program, receiving guidance from and reporting to the Energy Systems ER Division. Therefore, all ORNL ER policies and procedures are consistent with ER Division policies and procedures. This plan covers all ORNL ER activities, the participants involved in these activities (and their roles and responsibilities), and all phases of the remediation process. This plan will also serve as a template that may be supplemented as necessary to produce individual project management plans for specific projects. This document explains how the Energy Systems ORNL ER Program does business, so the ORNL ER Program`s management structure is illustrated in detail. Personnel are matrixed to the ER Program from other organizations to assist with specific projects. This plan identifies positions at the program level and discusses responsibilities and interactions with positions at the project level. This plan includes sections that describe requirements for project plans, work breakdown structures, schedules, project management and cost control systems, and information and reporting. Project management plans will utilize the work breakdown structure and dictionary pages in the appropriate life cycle baseline report This plan describes the information that should be contained in ORNL ER project management plans. The most important milestones are primary documents relating to the management and remediation of contaminated sites. Primary document milestones are subject to stipulated penalties and receive paramount attention.

Not Available

1994-07-01T23:59:59.000Z

193

ANL technical support program for DOE Environmental Restoration and Waste Management. Annual report, October 1991--September 1992  

Science Conference Proceedings (OSTI)

A program was established for DOE Environmental Restoration and Waste Management (EM) to evaluate factors that are anticipated to affect waste glass reaction during repository disposal, especially in an unsaturated environment typical of what may be expected for the proposed Yucca Mountain repository site. This report covers progress in FY 1992 on the following tasks: 1. A compendium of the characteristics of high-level nuclear waste borosilicate glass has been written. 2. A critical review of important parameters that affect the reactivity of glass in an unsaturated environment is being prepared. 3. A series of tests has been started to evaluate the reactivity of fully radioactive glasses in a high-level waste repository environment and compare it to the reactivity of synthetic, nonradioactive glasses of similar composition. 4. The effect of radiation upon the durability of waste glasses at a high glass surface area-to-liquid volume (SA/V) ratio and a high gas-to-liquid volume ratio will be assessed. These tests address both vapor and high SA/V liquid conditions. 5. A series of tests is being performed to compare the extent of reaction of nuclear waste glasses at various SAN ratios. Such differences in the SAN ratio may significantly affect glass durability. 6. A series of natural analogue tests is being analyzed to demonstrate a meaningful relationship between experimental and natural alteration conditions. 7. Analytical electron microscopy (AEM), infrared spectroscopys and nuclear resonant profiling are being used to assess the glass/water reaction pathway by identifying intermediate phases that appear on the reacting glass. Additionally, colloids from the leach solutions are being studied using AEM. 8. A technical review of AEM results is being provided. 9. A study of water diffusion involving nuclear waste glasses is being performed. 10. A mechanistically based model is being developed to predict the performance of glass over repository-relevant time periods.

Bates, J.K.; Bradley, C.R.; Buck, E.C.; Cunnane, J.C.; Dietz, N.L.; Ebert, W.L.; Emery, J.W.; Feng, X.; Gerding, T.J.; Gong, M.; Hoh, J.C.; Mazer, J.J.; Wronkiewicz, D.J. [Argonne National Lab., IL (United States); Bourcier, W.L.; Morgan, L.E.; Newton, L.; Nielsen, J.K.; Phillips, B.L. [Lawrence Livermore National Lab., CA (United States); Ewing, R.C.; Wang, L. [Univ. of New Mexico, Albuquerque, NM (United States); Li, H.; Tomozawa, M. [Rensselaer Polytechnic Inst., Troy, NY (United States)

1993-05-01T23:59:59.000Z

194

Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 408: Bomblet Target Area, Tonopah Test Range, Nevada  

SciTech Connect

This Streamlined Approach for Environmental Restoration Plan provides the details for the closure of Corrective Action Unit (CAU) 408, Bomblet Target Area. CAU 408 is located at the Tonopah Test Range and is currently listed in Appendix III of the Federal Facility Agreement and Consent Order of 1996. One Corrective Action Site (CAS) is included in CAU 408: {lg_bullet} CAS TA-55-002-TAB2, Bomblet Target Areas Based on historical documentation, personnel interviews, process knowledge, site visits, aerial photography, multispectral data, preliminary geophysical surveys, and the results of data quality objectives process (Section 3.0), clean closure will be implemented for CAU 408. CAU 408 closure activities will consist of identification and clearance of bomblet target areas, identification and removal of depleted uranium (DU) fragments on South Antelope Lake, and collection of verification samples. Any soil containing contaminants at concentrations above the action levels will be excavated and transported to an appropriate disposal facility. Based on existing information, contaminants of potential concern at CAU 408 include explosives. In addition, at South Antelope Lake, bomblets containing DU were tested. None of these contaminants is expected to be present in the soil at concentrations above the action levels; however, this will be determined by radiological surveys and verification sample results. The corrective action investigation and closure activities have been planned to include data collection and hold points throughout the process. Hold points are designed to allow decision makers to review the existing data and decide which of the available options are most suitable. Hold points include the review of radiological, geophysical, and analytical data and field observations.

NSTec Environmental Management

2006-10-01T23:59:59.000Z

195

Norfolk Southern boxcar blocking/bracing plan for the mixed waste disposal initiative project. Environmental Restoration Program  

Science Conference Proceedings (OSTI)

The US Department of Energy`s (DOE) Environmental Restoration and Waste Management programs will dispose of mixed waste no longer deemed useful. This project is one of the initial activities used to help meet this goal. The project will transport the {approximately}46,000 drums of existing stabilized mixed waste located at the Oak Ridge K-25 Site and presently stored in the K-31 and K-33 buildings to an off-site commercially licensed and permitted mixed waste disposal facility. Shipping and disposal of all {approximately}46,000 pond waste drums ({approximately}1,000,000 ft{sup 3} or 55,000 tons) is scheduled to occur over a period of {approximately}5--10 years. The first shipment of stabilized pond waste should transpire some time during the second quarter of FY 1994. Martin Marietta Energy Systems, Inc., proposes to line each of the Norfolk Southem boxcars with a prefabricated, white, 15-mm low-density polyethylene (LDPE) liner material. To avoid damaging the bottom of the polyethylene floor liner, a minimum .5 in. plywood will be nailed to the boxcars` nailable metal floor. At the end of the Mixed Waste Disposal Initiative (MWDI) Project workers at the Envirocare facility will dismantle and dispose of all the polyethylene liner and plywood materials. Envirocare of Utah, Inc., located in Clive, Utah, will perform a health physic survey and chemically and radiologically decontaminate, if necessary, each of the rail boxcars prior to them being released back to Energy Systems. Energy Systems will also perform a health physic survey and chemically and radiologically decontaminate, if necessary, each of the rail boxcars prior to them being released back to Norfolk Southem Railroad.

Seigler, R.S.

1994-01-01T23:59:59.000Z

196

Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 107: Low Impact Soil Sites, Nevada Test Site, Nevada  

SciTech Connect

This Streamlined Approach for Environmental Restoration Plan covers activities associated with Corrective Action Unit (CAU) 107 of the Federal Facility Agreement and Consent Order (FFACO, 1996 [as amended February 2008]). CAU 107 consists of the following Corrective Action Sites (CASs) located in Areas 1, 2, 3, 4, 5, 9, 10, and 18 of the Nevada Test Site. (1) CAS 01-23-02, Atmospheric Test Site - High Alt; (2) CAS 02-23-02, Contaminated Areas (2); (3) CAS 02-23-03, Contaminated Berm; (4) CAS 02-23-10, Gourd-Amber Contamination Area; (5) CAS 02-23-11, Sappho Contamination Area; (6) CAS 02-23-12, Scuttle Contamination Area; (7) CAS 03-23-24, Seaweed B Contamination Area; (8) CAS 03-23-27, Adze Contamination Area; (9) CAS 03-23-28, Manzanas Contamination Area; (10) CAS 03-23-29, Truchas-Chamisal Contamination Area; (11) CAS 04-23-02, Atmospheric Test Site T4-a; (12) CAS 05-23-06, Atmospheric Test Site; (13) CAS 09-23-06, Mound of Contaminated Soil; (14) CAS 10-23-04, Atmospheric Test Site M-10; and (15) CAS 18-23-02, U-18d Crater (Sulky). Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, engineering drawings, field screening, analytical results, and the results of data quality objectives process (Section 3.0), closure in place with administrative controls or no further action will be implemented for CAU 107. CAU 107 closure activities will consist of verifying that the current postings required under Title 10 Code of Federal Regulations (CFR) Part 835 are in place and implementing use restrictions (URs) at two sites, CAS 03-23-29 and CAS 18-23-02. The current radiological postings combined with the URs are adequate administrative controls to limit site access and worker dose.

NSTec Environmental Restoration

2008-09-30T23:59:59.000Z

197

Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 107: Low Impact Soil Sites, Nevada Test Site, Nevada  

SciTech Connect

This Streamlined Approach for Environmental Restoration Plan covers activities associated with Corrective Action Unit (CAU) 107 of the Federal Facility Agreement and Consent Order (1996 [as amended February 2008]). CAU 107 consists of the following Corrective Action Sites (CASs) located in Areas 1, 2, 3, 4, 5, 9, 10, and 18 of the Nevada Test Site. {sm_bullet} CAS 01-23-02, Atmospheric Test Site - High Alt{sm_bullet} CAS 02-23-02, Contaminated Areas (2){sm_bullet} CAS 02-23-03, Contaminated Berm{sm_bullet} CAS 02-23-10, Gourd-Amber Contamination Area{sm_bullet} CAS 02-23-11, Sappho Contamination Area{sm_bullet} CAS 02-23-12, Scuttle Contamination Area{sm_bullet} CAS 03-23-24, Seaweed B Contamination Area{sm_bullet} CAS 03-23-27, Adze Contamination Area{sm_bullet} CAS 03-23-28, Manzanas Contamination Area{sm_bullet} CAS 03-23-29, Truchas-Chamisal Contamination Area{sm_bullet} CAS 04-23-02, Atmospheric Test Site T4-a{sm_bullet} CAS 05-23-06, Atmospheric Test Site{sm_bullet} CAS 09-23-06, Mound of Contaminated Soil{sm_bullet} CAS 10-23-04, Atmospheric Test Site M-10{sm_bullet} CAS 18-23-02, U-18d Crater (Sulky) Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, engineering drawings, field screening, analytical results, and the results of data quality objectives process (Section 3.0), closure in place with administrative controls or no further action will be implemented for CAU 107.

NSTec Environmental Restoration

2009-03-31T23:59:59.000Z

198

Environmental Restoration Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maturity Maturity Value Target Score Maturity Value Target Score A1 Cost Estimate H 7.5 2 15.0 5 37.5 A2 Cost Risk/Contingency Analysis P 3.0 1 3.0 5 15.0 A3 Funding Requirements/Profile H 7.5 2 15.0 5 37.5 A4 Independent Cost Estimate/Schedule Review P 3.0 N/A 0.0 5 15.0 A5 Life Cycle Cost P 3.0 1 3.0 5 15.0 A6 Forecast of Cost at Completion P 3.0 N/A 0.0 5 15.0 A7 Cost Estimate for Next Phase Work Scope P 3.0 5 15.0 5 15.0 Subtotal Cost 51.0 150.0 B1 Project Schedule H 7.5 2 15.0 5 37.5 B2 Major Milestones P 3.0 2 6.0 5 15.0 B3 Resource Loading P 3.0 1 3.0 5 15.0 B4 Critical Path Management H 7.5 1 7.5 5 37.5 B5 Schedule Risk/Contingency Analysis P 3.0 1 3.0 5 15.0 B6 Forecast of Schedule Completion P 3.0 N/A 0.0 5 15.0 B7 Schedule for Next Phase Work Scope P 3.0 5 15.0 5 15.0 Subtotal Schedule 49.5 150.0 C1 Preliminary Assessments/Site Investigation P 2.5 5 12.5 5 12.5 C2

199

BNL Environmental Restoration Directorate  

NLE Websites -- All DOE Office Websites (Extended Search)

at the HWMF were cesium-137 and strontium-90. Elevated levels of heavy metals (mercury and lead) were also present in isolated areas. Cleanup at the HWMF began during...

200

BNL Environmental Restoration Directorate  

NLE Websites -- All DOE Office Websites (Extended Search)

Several cleanup activities were taking place during the summer of 2003. Meadow Marsh Ash Pit Former Hazardous Waste Management Facility A fact sheet is now available giving...

Note: This page contains sample records for the topic "inel environmental restoration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Environmental Restoration Programs: BGRR  

NLE Websites -- All DOE Office Websites (Extended Search)

was located on, and was supported by, Building 704. The individual cooling fans took suction through 48 in. diameter ducts that penetrated the building roof and connected at...

202

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 130: Storage Tanks, Nevada Test Site, Nevada, Revision 0  

Science Conference Proceedings (OSTI)

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 130, Storage Tanks, identified in the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended February 2008). Corrective Action Unit 130 consists of the seven following corrective action sites (CASs) located in Areas 1, 7, 10, 20, 22, and 23 of the Nevada Test Site: 01-02-01, Underground Storage Tank 07-02-01, Underground Storage Tanks 10-02-01, Underground Storage Tank 20-02-03, Underground Storage Tank 20-99-05, Tar Residue 22-02-02, Buried UST Piping 23-02-07, Underground Storage Tank This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 130 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible recommendation that no further corrective action is necessary. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The sites will be investigated based on the data quality objectives (DQOs) finalized on April 3, 2008, by representatives of NDEP; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for each CAS in CAU 130. The DQO process developed for this CAU identified the following expected closure options: (1) investigation and confirmation that no contamination exists above the final action levels, leading to a no further action declaration; (2) characterization of the nature and extent of contamination, leading to closure in place with use restrictions; or (3) clean closure by remediation and verification. The following text summarizes the SAFER activities that will support the closure of CAU 130: Perform site preparation activities (e.g., utilities clearances, geophysical surveys). Move or remove and dispose of debris at various CASs, as required. Collect environmental samples from designated target populations (e.g., stained soil) to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information. If no COCs are present at a CAS, establish no further action as the corrective action. If COCs exist, collect environmental samples from designated target populations (e.g., clean soil adjacent to contaminated soil) and submit for laboratory analyses to define the extent of COC contamination. If a COC is present at a CAS, either: - Establish clean closure as the corrective action. The material to be remediated will be removed, disposed of as waste, and verification samples will be collected from remaining soil, or - Establish closure in place as the corrective action and implement the appropriate use restrictions. Obtain consensus from NDEP that the preferred closure option is sufficient to protect human health and the environment. Close the underground storage tank(s) and their contents, if any, in accordance with Nevada Administrative Code regulations. Remove the lead brick(s) found at any CAS in accordance with the Resource Conservation and Recovery Act.

Alfred Wickline

2008-07-01T23:59:59.000Z

203

INEL BNCT Research Program, January/February 1993  

SciTech Connect

This report presents summaries for two months of current research of the Idaho National Engineering Laboratory (INEL) Boron Neutron Capture Therapy (BNCT) Program. Information is presented on development and murine screening experiments of low-density lipoprotein, carboranyl alanine, and liposome boron containing compounds. Pituitary tumor cell culture studies are described. Drug stability, pharmacology and toxicity evaluation of borocaptate sodium (BSH) and boronophenylaianine (BPA) are described. Treatment protocol development via the large animal (canine) model studies and physiological response evaluation in rats are discussed. Supporting technology development and technical support activities for boron drug biochemistry and purity, analytical and measurement dosimetry, and noninvasive boron quantification activities are included for the current time period. Current publications for the two months are listed.

Venhuizen, J.R. [ed.

1993-04-01T23:59:59.000Z

204

Evaluation of potential for MSRE spent fuel and flush salt storage and treatment at the INEL  

SciTech Connect

The potential for interim storage as well as for treatment of the Molten Salt Reactor Experiment spent fuel at INEL has been evaluated. Provided that some minimal packaging and chemical stabilization prerequisites are satisfied, safe interim storage of the spent fuel at the INEL can be achieved in a number of existing or planned facilities. Treatment by calcination in the New Waste Calcining Facility at the INEL can also be a safe, effective, and economical alternative to treatment that would require the construction of a dedicated facility. If storage at the INEL is chosen for the Molten Salt Reactor Experiment (MSRE) spent fuel salts, their transformation to the more stable calcine solid would still be desirable as it would result in a lowering of risks. Treatment in the proposed INEL Remote-Handled Immobilization Facility (RHIF) would result in a waste form that would probably be acceptable for disposal at one of the proposed national repositories. The cost increment imputable to the treatment of the MSRE salts would be a small fraction of the overall capital and operating costs of the facility or the cost of building and operating a dedicated facility. Institutional and legal issues regarding shipments of fuel and waste to the INEL are summarized. The transfer of MSRE spent fuel for interim storage or treatment at the INEL is allowed under existing agreements between the State of idaho and the Department of energy and other agencies of the Federal Government. In contrast, current agreements preclude the transfer into Idaho of any radioactive wastes for storage or disposal within the State of Idaho. This implies that wastes and residues produced from treating the MSRE spent fuel at locations outside Idaho would not be acceptable for storage in Idaho. Present agreements require that all fuel and high-level wastes stored at the INEL, including MSRE spent fuel if received at the INEL, must be moved to a location outside Idaho by the year 2035.

Ougouag, A.M.; Ostby, P.A.; Nebeker, R.L.

1996-09-01T23:59:59.000Z

205

A preliminary evaluation of alternatives for treatment of INEL Low-Level Waste and low-level mixed waste  

SciTech Connect

The Mixed and Low-Level Waste Treatment Facility (MLLWTF) project was established in 1991 by the US Department of Energy Idaho Field Office to provide treatment capabilities for Idaho National Engineering Laboratory (INEL) low-level mixed waste and low-level waste. This report identifies and evaluates the alternatives for treating that waste. Twelve treatment alternatives, ranging from ``no-action`` to constructing and operating the MLLWTF, are identified and evaluated. Evaluations include facility performance, environmental, safety, institutional, schedule, and rough order-of-magnitude cost comparisons. The performance of each alternative is evaluated against lists of ``musts`` and ``wants.`` Also included is a discussion of other key considerations for decision making. Analysis of results indicated further study is necessary to obtain the best estimate of future waste volumes and characteristics from the expanded INEL Decontamination and Decommissioning Program. It is also recommended that conceptual design begin as scheduled on the MLLWTF, maximum treatment alternative while re-evaluating the waste volume projections.

Smith, T.H.; Roesener, W.S.; Jorgensen-Waters, M.J.; Edinborough, C.R.

1992-06-01T23:59:59.000Z

206

Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 398: Area 25 Spill Sites, Nevada Test Site, Nevada  

DOE Green Energy (OSTI)

This Streamlined Approach for Environmental Restoration (SAFER) plan addresses the activities necessary to close Corrective Action Unit (CAU) 398: Area 25 Spill Sites. CAU 398, located in Area 25 of the Nevada Test Site, is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996), and consists of the following 13 Corrective Action Sites (CASs) (Figure 1): (1) CAS 25-44-01 , a fuel spill on soil that covers a concrete pad. The origins and use of the spill material are unknown, but the spill is suspected to be railroad bedding material. (2) CAS 25-44-02, a spill of liquid to the soil from leaking drums. (3) CAS 25-44-03, a spill of oil from two leaking drums onto a concrete pad and surrounding soil. (4) CAS 25-44-04, a spill from two tanks containing sulfuric acid and sodium hydroxide used for a water demineralization process. (5) CAS 25-25-02, a fuel or oil spill from leaking drums that were removed in 1992. (6) CAS 25-25-03, an oil spill adjacent to a tipped-over drum. The source of the drum is not listed, although it is noted that the drum was removed in 1991. (7) CAS 25-25-04, an area on the north side of the Engine-Maintenance, Assembly, and Disassembly (E-MAD) facility, where oils and cooling fluids from metal machining operations were poured directly onto the ground. (8) CAS 25-25-05, an area of oil and/or hydraulic fluid spills beneath the heavy equipment once stored there. (9) CAS 25-25-06, an area of diesel fuel staining beneath two generators that have since been removed. (10) CAS 25-25-07, an area of hydraulic oil spills associated with a tunnel-boring machine abandoned inside X-Tunnel. (11) CAS 25-25-08, an area of hydraulic fluid spills associated with a tunnel-boring machine abandoned inside Y-Tunnel. (12) CAS 25-25-16, a diesel fuel spill from an above-ground storage tank located near Building 3320 at Engine Test Stand-1 (ETS-1) that was removed in 1998. (13) CAS 25-25-17, a hydraulic oil spill associated with the historical operations of a vacuum pump oil recovery system at the E-MAD facility.

K. B. Campbell

2001-11-01T23:59:59.000Z

207

Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 121: Storage Tanks and Miscellaneous Sites, Nevada Test Site, Nevada  

Science Conference Proceedings (OSTI)

This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for the closure of Corrective Action Unit (CAU) 121, Storage Tanks and Miscellaneous Sites. CAU 121 is currently listed in Appendix III of the ''Federal Facility Agreement and Consent Order'' (FFACO, 1996) and consists of three Corrective Action Sites (CASs) located in Area 12 of the Nevada Test Site (NTS): CAS 12-01-01, Aboveground Storage Tank; CAS 12-01-02, Aboveground Storage Tank; and CAS 12-22-26, Drums; 2 AST's. CASs 12-01-01 and 12-01-02 are located to the west of the Area 12 Camp, and CAS 12-22-26 is located near the U-12g Tunnel, also known as G-tunnel, in Area 12 (Figure 1). The aboveground storage tanks (ASTs) present at CASs 12-01-01 and 12-01-02 will be removed and disposed of at an appropriate facility. Soil below the ASTs will be sampled to identify whether it has been impacted with chemicals or radioactivity above action levels. If impacted soil above action levels is present, the soil will be excavated and disposed of at an appropriate facility. The CAS 12-22-26 site is composed of two overlapping areas, one where drums had formerly been stored, and the other where an AST was used to dispense diesel for locomotives used at G-tunnel. This area is located above an underground radioactive materials area (URMA), and within an area that may have elevated background radioactivity because of containment breaches during nuclear tests and associated tunnel reentry operations. CAS 12-22-26 does not include the URMA or the elevated background radioactivity. An AST that had previously been used to store liquid magnesium chloride (MgCl) was properly disposed of several years ago, and releases from this tank are not an environmental concern. The diesel AST will be removed and disposed of at an appropriate facility. Soil at the former drum area and the diesel AST area will be sampled to identify whether it has been impacted by releases, from the drums or the AST, with chemicals or radioactivity above action levels. CAS 12-22-26 has different potential closure pathways that are dependent upon the concentrations and chemicals detected. If only petroleum hydrocarbons are detected above action levels, then the area will be use-restricted. It will not be excavated because of the more significant hazard of excavating within a URMA. Similarly, polychlorinated biphenyls (PCBs) will only be excavated for concentrations of 50 parts per million (ppm) or greater, if there are no other factors that require excavation. For PCBs at concentrations above 1 ppm, the area will be use-restricted as required by Title 40, Code of Federal Regulations (CFR) Part 761 for PCBs (CFR, 2006), in the ''Toxic Substances Control Act'' (TSCA). Other chemicals at concentrations above the final action levels (FALs) will be excavated. If radioactivity is above action levels, then the soil will be excavated only to a depth of 1 foot (ft) below ground surface (bgs) and replaced with clean fill. This action is intended to remove the ''hot spot'' on the surface caused by leakage from a drum, and not to remediate the URMA.

NSTec Environmental Restoration

2007-06-01T23:59:59.000Z

208

Environmental Restoration/Waste Management - applied technology. Semiannual report, July 1992--June 1993, Volume 1, Number 2, and Volume 2, Number 1  

SciTech Connect

The Environmental Restoration/Waste Management-Applied Technology (ER/WM-AT) Program is developing restoration and waste treatment technologies needed for the ongoing environmental cleanup of the Department of Energy (DOE) complex and treatment technologies for wastes generated in the nuclear weapons production complex. These technologies can find application to similar problems nationally and even worldwide. They can be demonstrated at the Livermore site, which mirrors (on a small scale) many of the environmental and waste management problems of the rest of the DOE complex. Their commercialization should speed cleanup, and the scope of the task should make it attractive to US industry. The articles in this semi-annual report cover the following areas: ceramic final forms for residues of mixed waste treatment; treatment of wastes containing sodium nitrate; actinide volatility in thermal oxidation processes; in situ microbial filters for remediating contaminated soils; collaboration with scientists in the former Soviet Union on new ER/WM technologies; and fiber-optic sensors for chlorinated organic solvents.

Murphy, P.W.; Bruner, J.M.; Price, M.E.; Talaber, C.J. [eds.

1993-12-31T23:59:59.000Z

209

EA-0995: Drum Storage Facility for Interim Storage of Materials Generated by Environmental Restoration Operations, Golden, Colorado  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts of the proposal to construct and operate a drum storage facility at the U.S. Department of Energy's Rocky Flats Environmental Technology Site in Golden,...

210

Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 134: Aboveground Storage Tanks, Nevada Test Site, Nevada  

Science Conference Proceedings (OSTI)

This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for the closure of Corrective Action Unit (CAU) 134, Aboveground Storage Tanks. CAU 134 is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996; as amended February 2008) and consists of four Corrective Action Sites (CASs) located in Areas 3, 15, and 29 of the Nevada Test Site (NTS) (Figure 1): (1) CAS 03-01-03, Aboveground Storage Tank; (2) CAS 03-01-04, Tank; (3) CAS 15-01-05, Aboveground Storage Tank; and (4) CAS 29-01-01, Hydrocarbon Stain. CAS 03-01-03 consists of a mud tank that is located at the intersection of the 3-07 and the 3-12 Roads in Area 3 of the NTS. The tank and its contents are uncontaminated and will be dispositioned in accordance with applicable federal, state, and local regulations. This CAS will be closed by taking no further action. CAS 03-01-04 consists of a potable water tank that is located at the Core Complex in Area 3 of the NTS. The tank will be closed by taking no further action. CAS 15-01-05 consists of an aboveground storage tank (AST) and associated impacted soil, if any. This CAS is located on a steep slope near the Climax Mine in Area 15 of the NTS. The AST is empty and will be dispositioned in accordance with applicable federal, state, and local regulations. Soil below the AST will be sampled to identify whether it has been impacted by chemicals at concentrations exceeding the action levels. It appears that the tank is not at its original location. Soil will also be sampled at the original tank location, if it can be found. If soil at either location has been impacted at concentrations that exceed the action levels, then the extent of contamination will be identified and a use restriction (UR) will be implemented. The site may be clean closed if contamination is less than one cubic yard in extent and can be readily excavated. If action levels are not exceeded, then no further action is required. CAS 29-01-01 consists of soil that has been impacted by a release or operations from an active diesel AST that fuels the generator at the Shoshone Receiver Site in Area 29 of the NTS. Soil below the AST will be sampled to identify whether it has been impacted at concentrations exceeding the action levels. If it is, then the extent of contamination will be identified and a UR will be implemented. The site may be clean closed if contamination is less than one cubic yard in extent, can be readily excavated, and it is determined that clean closure is feasible based upon site conditions. If action levels are not exceeded, then no further action is required. Based on review of the preliminary assessment information for CAU 134 and recent site inspections, there is sufficient process knowledge to close CAU 134 using the SAFER process.

NSTec Environmental Restoration

2008-05-31T23:59:59.000Z

211

Health and safety plan for operations performed for the Environmental Restoration Program. Task, OU 1-03 and OU 4-10 Track 2 investigations  

Science Conference Proceedings (OSTI)

This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG&G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

Trippet, W.A. II [IT Corp., (United States); Reneau, M.; Morton, S.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States)

1992-04-01T23:59:59.000Z

212

Environmental Restoration of Corrective Action Unit 408: Bomblet Target Area, Tonopah Test Range, Nevada (Funded by the American Reinvestment and Recovery Act)  

SciTech Connect

The mission of the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Environmental Restoration Program is to address the environmental impacts of weapons testing conducted on the Nevada National Security Site and the Nevada Test and Training Range. The large physical size of these sites, along with limits on funding and other resources available for remediation efforts, means that environmental restoration activities must be prioritized and accomplished incrementally over time. The remediation of a bomblet target area on the Tonopah Test Range (TTR), which is located within the Nevada Test and Training Range, was originally planned in 2007 but was not carried out until funding became available in the summer of 2009 through the American Reinvestment and Recovery Act. This activity was implemented in accordance with the Federal Facility Agreement and Consent Order established between NNSA/NSO and the Nevada Division of Environmental Protection. This activity which was complete by the end of Fiscal Year 2010, involved the excavation of disposal pits suspected of containing submunitions and the surface clearance of submunitions on seven target areas amounting to approximately 6.7 square kilometers of land at the TTR. The TTR was used by Sandia National Laboratories from the late 1960s through the mid-1980s to conduct research into the deployment of submunitions. Although there were efforts to identify, collect, and dispose various amounts of unexploded ordnance on the TTR in the past, no comprehensive effort to remediate the entire flightline area for submunitions was undertaken before this project.

Kevin Cabble (NSO), Mark Burmeister and Mark Krauss (N-I)

2011-03-03T23:59:59.000Z

213

A strategic analysis study-based approach to integrated risk assessment: Occupational health risks from environmental restoration and waste management activities at Hanford  

SciTech Connect

The goal of environmental restoration and waste management activities is to reduce public health risks or to delay risks to the future when new technology will be available for improved cleanup solutions. Actions to remediate the wastes on the Hanford Site will entail risks to workers, the public, and the environment that do not currently exist. In some circumstances, remediation activities will create new exposure pathways that are not present without cleanup activities. In addition, cleanup actions will redistribute existing health risks over time and space, and will likely shift health risks to cleanup workers in the short term. This report describes an approach to occupational risk assessment based on the Hanford Strategic Analysis Study and illustrates the approach by comparing worker risks for two options for remediation of N/K fuels, a subcategory of unprocessed irradiated fuels at Hanford.

Mahaffey, J.A.; Doctor, P.G.; Buschbom, R.L.; Glantz, C.S.; Daling, P.M.; Sever, L.E.; Vargo, G.J. Jr.; Strachan, D.M. (Pacific Northwest Lab., Richland, WA (United States)); Pajunen, A.L.; Hoyt, R.C.; Ludowise, J.D. (Westinghouse Hanford Co., Richland, WA (United States))

1993-06-01T23:59:59.000Z

214

Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 484: Surface Debris, Waste Sites, and Burn Area, Tonopah Test Range, Nevada  

Science Conference Proceedings (OSTI)

This Streamlined Approach for Environmental Restoration plan details the activities necessary to close Corrective Action Unit (CAU) 484: Surface Debris, Waste Sites, and Burn Area (Tonopah Test Range). CAU 484 consists of sites located at the Tonopah Test Range, Nevada, and is currently listed in Appendix III of the Federal Facility Agreement and Consent Order. CAU 484 consists of the following six Corrective Action Sites: (1) CAS RG-52-007-TAML, Davis Gun Penetrator Test; (2) CAS TA-52-001-TANL, NEDS Detonation Area; (3) CAS TA-52-004-TAAL, Metal Particle Dispersion Test; (4) CAS TA-52-005-TAAL, Joint Test Assembly DU Sites; (5) CAS TA-52-006-TAPL, Depleted Uranium Site; and (6) CAS TA-54-001-TANL, Containment Tank and Steel Structure

Bechel Nevada

2004-05-01T23:59:59.000Z

215

A document review to characterize Atomic International SNAP fuels shipped to INEL 1966--1973  

Science Conference Proceedings (OSTI)

This report provides the results of a document search and review study to obtain information on the spent fuels for the following six Nuclear Auxiliary Power (SNAP) reactor cores now stored at the Idaho National Engineering Laboratory (INEL): SNAP-2 Experimental Reactor, SNAP-2 Development Reactor, SNAP-10A Ground Test Reactor, SNAP-8 Experimental Reactor, SNAP-8 Development Reactor, and Shield Test Reactor. The report also covers documentation on SNAP fuel materials from four in-pile materials tests: NAA-82-1, NAA-115-2, NAA-117-1, and NAA-121. Pieces of these fuel materials are also stored at INEL as part of the SNAP fuel shipments.

Wahnschaffe, S.D.; Lords, R.E. [eds.; Kneff, D.W.; Nagel, W.E.; Pearlman, H.; Schaubert, V.J.

1995-09-01T23:59:59.000Z

216

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 538: Spill Sites, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions necessary for the closure of Corrective Action Unit (CAU) 538: Spill Sites, Nevada Test Site, Nevada. It has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. A SAFER may be performed when the following criteria are met: (1) Conceptual corrective actions are clearly identified (although some degree of investigation may be necessary to select a specific corrective action before completion of the Corrective Action Investigation [CAI]). (2) Uncertainty of the nature, extent, and corrective action must be limited to an acceptable level of risk. (3) The SAFER Plan includes decision points and criteria for making data quality objective (DQO) decisions. The purpose of the investigation will be to document and verify the adequacy of existing information; to affirm the decision for either clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. This SAFER Plan identifies decision points developed in cooperation with the Nevada Division of Environmental Protection (NDEP) and where DOE will reach consensus with NDEP before beginning the next phase of work.

Alfred Wickline

2006-04-01T23:59:59.000Z

217

White Oak Creek Embayment time-critical CERCLA removal action sediment-retention structure. Environmental Restoration Program  

SciTech Connect

Over a 20-month period between September 1990 and April 1992, the Department of Energy (DOE), acting through Martin Marietta Energy Systems, Inc., managing contractor for the DOE Oak Ridge Field Office (DOE-OR), conducted a DOE-lead and DOE-funded time-critical removal action at the White Oak Creek Embayment (WOCE), pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The time-critical removal action specifically consisted of the design and construction of a sediment-retention structure across the mouth of WOCE to prevent off-site migration of sediments contaminated by cesium ({sup 137}Cs) into the Clinch River. Construction of a sediment-retention structure was completed in mid-April 1992. The purpose of this report is to meet the substantive requirements of 40 CFR 300.165 describing ``a complete report on the removal operation and the actions taken.`` This section of the NCP specifically addresses on-scene coordinator reports for the Environmental Protection Agency (EPA) Superfund-lead actions and includes several elements that are not applicable to this DOE-lead action. Only those sections that are pertinent and applicable are addressed in this final report.

1992-09-01T23:59:59.000Z

218

Environmental, safety, and health plan for the remedial investigation of Waste Area Grouping 10, Operable Unit 3, at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program  

Science Conference Proceedings (OSTI)

This document outlines the environmental, safety, and health (ES&H) approach to be followed for the remedial investigation of Waste Area Grouping (WAG) 10 at Oak at Ridge National Laboratory. This ES&H Plan addresses hazards associated with upcoming Operable Unit 3 field work activities and provides the program elements required to maintain minimal personnel exposures and to reduce the potential for environmental impacts during field operations. The hazards evaluation for WAG 10 is presented in Sect. 3. This section includes the potential radiological, chemical, and physical hazards that may be encountered. Previous sampling results suggest that the primary contaminants of concern will be radiological (cobalt-60, europium-154, americium-241, strontium-90, plutonium-238, plutonium-239, cesium-134, cesium-137, and curium-244). External and internal exposures to radioactive materials will be minimized through engineering controls (e.g., ventilation, containment, isolation) and administrative controls (e.g., procedures, training, postings, protective clothing).

Not Available

1993-10-01T23:59:59.000Z

219

Applicable or relevant and appropriate requirements (ARARs) for remedial actions at the Paducah Gaseous Diffusion Plant: A compendium of environmental laws and guidance. Environmental Restoration Program  

Science Conference Proceedings (OSTI)

Section 121 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 specifies that remedial actions for cleanup of hazardous substances found at sites placed on the National Priorities List (NPL) by the US Environmental Protection Agency (EPA) must comply with applicable or relevant and appropriate requirements (ARARs) or standards under federal and state environmental laws. To date, the US Department of Energy (DOE) Paducah Gaseous Diffusion Plant (PGDP) has not been on the NPL. Although DOE and EPA have entered into an Administrative Consent Order (ACO), the prime regulatory authority for cleanup at PGDP will be the Resource Conservation and Recovery Act (RCRA). This report supplies a preliminary list of available federal and state ARARs that might be considered for remedial response at PGDP in the event that the plant becomes included on the NPL or the ACO is modified to include CERCLA cleanup. A description of the terms ``applicable`` and ``relevant and appropriate`` is provided, as well as definitions of chemical-, location-, and action-specific ARARS. ARARs promulgated by the federal government and by the state of Kentucky are listed in tables. In addition, the major provisions of RCRA, the Safe Drinking Water Act, the Clean Water Act, the Clean Air Act, and other acts, as they apply to hazardous and radioactive waste cleanup, are discussed.

Etnier, E.L.; Eaton, L.A. [Oak Ridge National Lab., TN (United States)

1992-03-01T23:59:59.000Z

220

Data management plan for the Oak Ridge Environmental Information System, Version 1.1. Enviornmental Restoration Program  

SciTech Connect

The Data Management Plan (DMP) describes the data management objectives, system components, data base structure and contents, system maintenance, data processing, and user interface for the prototype phase of the Oak Ridge Environmental Information System (OREIS). The major goals of OREIS data management are to compile data of known quality, to maintain the integrity of the data base, and to provide data to users. The DMP defines the requirements, describes the responsibilities, and references the procedures for meeting the data management objectives. Emphasis is on management of measurement data and the associated metadata used to support its proper interpretation and legal defensibility. The DMP covers transmittal, processing, storage, and data access activities associated with OREIS. The OREIS data dictionary is provided as an appendix.

Not Available

1992-08-04T23:59:59.000Z

Note: This page contains sample records for the topic "inel environmental restoration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Sulfur polymer stabilization/solidification (SPSS) treatment of mixed waste mercury recovered from environmental restoration activities at BNL  

SciTech Connect

Over 1,140 yd{sup 3} of radioactively contaminated soil containing toxic mercury (Hg) and several liters of mixed-waste elemental mercury were generated during a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) removal action at Brookhaven National Laboratory (BNL). The US Department of Energy's (DOE) Office of Science and Technology Mixed Waste Focus Area (DOE MWFA) is sponsoring a comparison of several technologies that may be used to treat these wastes and similar wastes at BNL and other sites across the DOE complex. This report describes work conducted at BNL on the application and pilot-scale demonstration of the newly developed Sulfur Polymer Stabilization/Solidification (SPSS) process for treatment of contaminated mixed-waste soils containing high concentrations ({approximately} 5,000 mg/L) of mercury and liquid elemental mercury. BNL's SPSS (patent pending) process chemically stabilizes the mercury to reduce vapor pressure and leachability and physically encapsulates the waste in a solid matrix to eliminate dispersion and provide long-term durability. Two 55-gallon drums of mixed-waste soil containing high concentrations of mercury and about 62 kg of radioactive contaminated elemental mercury were successfully treated. Waste loadings of 60 wt% soil were achieved without resulting in any increase in waste volume, while elemental mercury was solidified at a waste loading of 33 wt% mercury. Toxicity Characteristic Leaching Procedure (TCLP) analyses indicate the final waste form products pass current Environmental Protection Agency (EPA) allowable TCLP concentrations as well as the more stringent proposed Universal Treatment Standards. Mass balance measurements show that 99.7% of the mercury treated was successfully retained within the waste form, while only 0.3% was captured in the off gas system.

Kalb, P.; Adams, J.; Milian, L.

2001-01-29T23:59:59.000Z

222

EA-0995: Final Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE))

Drum Storage Facility for Interim Storage of Materials Generated by Environmental Restoration Operations

223

Project management plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory. Environmental Restoration Program  

Science Conference Proceedings (OSTI)

The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place nineteen former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S&M) and as quickly and economically as possible. Implementation and completion of the deactivation project win further reduce the already small risks to the environment and to public safety and health. Furthermore, the project should result in significant S&M cost savings in the future. The IFDP management plan has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted a strategy to deactivate the simple facilities first, to reduce the scope of the project, and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify those activities that best promote the project mission and result in largest cost savings. The Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory (Energy Systems 1994) defines the project schedule, the cost estimate, and the technical approach for the project.

NONE

1995-04-01T23:59:59.000Z

224

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada With Errata Sheets, Revision 0  

Science Conference Proceedings (OSTI)

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 117, Pluto Disassembly Facility, identified in the Federal Facility Agreement and Consent Order. Corrective Action Unit 117 consists of one Corrective Action Site (CAS), CAS 26-41-01, located in Area 26 of the Nevada Test Site. This plan provides the methodology for field activities needed to gather the necessary information for closing CAS 26-41-01. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU117 using the SAFER process. Additional information will be obtained by conducting a field investigation before finalizing the appropriate corrective action for this CAS. The results of the field investigation will support a defensible recommendation that no further corrective action is necessary following SAFER activities. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The site will be investigated to meet the data quality objectives (DQOs) developed on June27,2007, by representatives of NDEP; U.S.Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAS26-41-01 in CAU117.

Pat Matthews

2007-09-01T23:59:59.000Z

225

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 118: Area 27 Super Kukla Facility, Nevada Test Site, Nevada, Rev. No.: 1  

SciTech Connect

This Streamlined Approach for Environmental Restoration (SAFER) plan addresses closure for Corrective Action Unit (CAU) 118, Area 27 Super Kukla Facility, identified in the ''Federal Facility Agreement and Consent Order''. Corrective Action Unit 118 consists of one Corrective Action Site (CAS), 27-41-01, located in Area 27 of the Nevada Test Site. Corrective Action Site 27-41-01 consists of the following four structures: (1) Building 5400A, Reactor High Bay; (2) Building 5400, Reactor Building and access tunnel; (3) Building 5410, Mechanical Building; and (4) Wooden Shed, a.k.a. ''Brock House''. This plan provides the methodology for field activities needed to gather the necessary information for closing the CAS. There is sufficient information and process knowledge from historical documentation and site confirmation data collected in 2005 and 2006 to recommend closure of CAU 118 using the SAFER process. The Data Quality Objective process developed for this CAU identified the following expected closure option: closure in place with use restrictions. This expected closure option was selected based on available information including contaminants of potential concern, future land use, and assumed risks. There are two decisions that need to be answered for closure. Decision I is to determine the nature of contaminants of concern in environmental media or potential source material that could impact human health or the environment. Decision II is to determine whether or not sufficient information has been obtained to confirm that closure objectives were met. This decision includes determining whether the extent of any contamination remaining on site has been defined, and whether actions have been taken to eliminate exposure pathways.

David Strand

2006-09-01T23:59:59.000Z

226

Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 425: Area 9 Main Lake Construction Debris Disposal Area, Tonopah Test Range, Nevada  

DOE Green Energy (OSTI)

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the action necessary for the closure of Corrective Action Unit (CAU) 425, Area 9 Main Lake Construction Debris Disposal Area. This CAU is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO, 1996). This site will be cleaned up under the SAFER process since the volume of waste exceeds the 23 cubic meters (m{sup 3}) (30 cubic yards [yd{sup 3}]) limit established for housekeeping sites. CAU 425 is located on the Tonopah Test Range (TTR) and consists of one Corrective Action Site (CAS) 09-08-001-TA09, Construction Debris Disposal Area (Figure 1). CAS 09-08-001-TA09 is an area that was used to collect debris from various projects in and around Area 9. The site is located approximately 81 meters (m) (265 feet [ft]) north of Edwards Freeway northeast of Main Lake on the TTR. The site is composed of concrete slabs with metal infrastructure, metal rebar, wooden telephone poles, and concrete rubble from the Hard Target and early Tornado Rocket sled tests. Other items such as wood scraps, plastic pipes, soil, and miscellaneous nonhazardous items have also been identified in the debris pile. It is estimated that this site contains approximately 2280 m{sup 3} (3000 yd{sup 3}) of construction-related debris.

K. B. Campbell

2002-04-01T23:59:59.000Z

227

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 408: Bomblet Target Area Tonopah Test Range (TTR), Nevada, Revision 1  

SciTech Connect

This Streamlined Approach for Environmental Restoration Plan addresses the actions needed to achieve closure of Corrective Action Unit (CAU) 408, Bomblet Target Area (TTR). Corrective Action Unit 408 is located at the Tonopah Test Range and is currently listed in Appendix III of the Federal Facility Agreement and Consent Order. Corrective Action Unit 408 comprises Corrective Action Site TA-55-002-TAB2, Bomblet Target Areas. Clean closure of CAU 408 will be accomplished by removal of munitions and explosives of concern within seven target areas and potential disposal pits. The target areas were used to perform submunitions related tests for the U.S. Department of Energy (DOE). The scope of CAU 408 is limited to submunitions released from DOE activities. However, it is recognized that the presence of other types of unexploded ordnance and munitions may be present within the target areas due to the activities of other government organizations. The CAU 408 closure activities consist of: Clearing bomblet target areas within the study area. Identifying and remediating disposal pits. Collecting verification samples. Performing radiological screening of soil. Removing soil containing contaminants at concentrations above the action levels. Based on existing information, contaminants of potential concern at CAU 408 include unexploded submunitions, explosives, Resource Conservation Recovery Act metals, and depleted uranium. Contaminants are not expected to be present in the soil at concentrations above the action levels; however, this will be determined by radiological surveys and verification sample results.

Mark Krauss

2010-03-01T23:59:59.000Z

228

Surface water sampling and analysis plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program  

SciTech Connect

This Sampling and Analysis Plan addresses surface water monitoring, sampling, and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Martin Marietta Energy Systems, Inc. Surface water monitoring will be conducted at nine sites within WAG 6. Activities to be conducted will include the installation, inspection, and maintenance of automatic flow-monitoring and sampling equipment and manual collection of various water and sediment samples. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the surface water monitoring, sampling, and analysis will aid in evaluating risk associated with contaminants migrating off-WAG, and will be used in calculations to establish relationships between contaminant concentration (C) and flow (Q). The C-Q relationship will be used in calculating the cumulative risk associated with the off-WAG migration of contaminants.

Not Available

1994-06-01T23:59:59.000Z

229

A comparative analysis of alternative fuels for the INEL vehicle fleet  

DOE Green Energy (OSTI)

This report summarizes the results of a comparative systems analysis of various alternative fuels for use in the buses, mid-size vehicles, and automobiles that make up the vehicle fleet at the Idaho National Engineering Laboratory (INEL). The study was performed as part of the Laboratory Directed Research and Development (LDRD) Program for EG G Idaho, Inc. Regulations will require the INEL to reduce total gasoline and diesel fuel use 10% by 1995 compared with 1991 levels, and will require that 50% of all new vehicles be fueled by some type of alternative fuel by 1998. A model was developed to analyze how these goals could be achieved, and what the cost would be to implement the goals.

Priebe, S.; Boyer, W.; Church, K.

1992-11-01T23:59:59.000Z

230

A comparative analysis of alternative fuels for the INEL vehicle fleet  

DOE Green Energy (OSTI)

This report summarizes the results of a comparative systems analysis of various alternative fuels for use in the buses, mid-size vehicles, and automobiles that make up the vehicle fleet at the Idaho National Engineering Laboratory (INEL). The study was performed as part of the Laboratory Directed Research and Development (LDRD) Program for EG&G Idaho, Inc. Regulations will require the INEL to reduce total gasoline and diesel fuel use 10% by 1995 compared with 1991 levels, and will require that 50% of all new vehicles be fueled by some type of alternative fuel by 1998. A model was developed to analyze how these goals could be achieved, and what the cost would be to implement the goals.

Priebe, S.; Boyer, W.; Church, K.

1992-11-01T23:59:59.000Z

231

Technical issues associated with in situ vitrification of the INEL Subsurface Disposal Area  

SciTech Connect

In situ vitrification (ISV) has been identified as an alternative technology for remediation of the Acid Pit and Transuranic Pits and Trenches (TRU-PTs) that are present at the Idaho National Engineering Laboratory (INEL) Subsurface Disposal Area (SDA). However, a number of technical issues exist that must be resolved before ISV can be considered applicable to these waste sites. To assist in the ISV technology evaluation, an ISV Steering Committee was formed to identify, prioritize, and develop closure roadmaps for technical issues associated with ISV application at the INEL SDA. The activities of the ISV Steering Committee are summarized in three volumes of this report. This document, Volume 1, identifies the systematic approach used to identify and prioritize the ISV technical issues, and briefly discusses the methodology that will be employed to resolve these issues.

Stoots, C.M.; Bates, S.O.; Callow, R.A.; Campbell, K.A.; Farnsworth, R.K.; Gratson, G.K.; McKellar, M.G.; Nickelson, D.F.; Slater, C.E.

1991-12-01T23:59:59.000Z

232

2005 Supplement Analysis of the INL Site Portion of the April 1995 Programmatic Spent Nuclear Fule Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

03-F-SA-02 03-F-SA-02 2005 SUPPLEMENT ANALYSIS of the INL Site Portion of the April 1995 Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final Environmental Impact Statement June 2005 United States Department of Energy Idaho Operations Office 1.0. 2.0. 3.0. 3.1. 3.2. 3.3. 3.4. 3.5. 3.6. 4.0. 5.0. 5.1. 5.2. 5.3. 5.3.1. 5.3.2. 5.3.3. 5.3.4. 5.3.5. 5.4. 6.0. 6.1. 6.2. 6.3. 6.3.1. 6.3.2. 6.3.3. 6.3.4. 6.3.5. 6.3.6. 6.3.7. 6.3.8. 6.3.9. 6.3.10. 6.3.11. 6.3.12. 6.3.13. 6.3.14. 6.3.15. 6.3.16. 6.3.17. 6.3.18. DOE/EIS-0203-F-SA-02 Table of Contents EXECUTIVE SUMMARY..................................................................................1 INTRODUCTION..............................................................................................

233

Summary of INEL research on the iron-enriched basalt waste form  

SciTech Connect

This report summarizes the knowledge base on the iron-enriched basalt (IEB) waste form developed at the Idaho National Engineering Laboratory (INEL) during 1979--1982. The results presented discuss the applicability of IEB in converting retrieved transuranic (TRU) waste from INEL`s Radioactive Waste Management Complex (RWMC) into a vitreous/ceramic (glassy/rock) stable waste form suitable for permanent disposal in an appropriate repository, such as the Waste Isolation Pilot Plant (WIPP) in New Mexico. Borosilicate glass (BSG), the approved high-level waste form, appears unsuited for this application. Melting the average waste-soil mix from the RWMC produces the IEB composition and attempting to convert IEB to the BSG composition would require additions of substantial B{sub 2}0{sub 3}, Na, and SiO{sub 2} (glass frit). IEB requires processing temperatures of 1400 to 1600{degrees}C, depending upon the waste composition. Production of the IEB waste form, using Joule heated melters, has proved difficult in the past because of electrode and refractory corrosion problems associated with the high temperature melts. Higher temperature electric melters (arc and plasma) are available to produce this final waste form. Past research focused on extensive slag property measurements, waste form leachability tests, mechanical, composition, and microstructure evaluations, as well as a host of experiments to improve production of the waste form. Past INEL studies indicated that the IEB glass-ceramic is a material that will accommodate and stabilize a wide range of heterogeneous waste materials, including long lived radionuclides and scrap metals, while maintaining a superior level of chemical and physical performance characteristics. Controlled cooling of the molten IEB and subsequent heat treatment will produce a glass-ceramic waste form with superior leach resistance.

Reimann, G.A.; Grandy, J.D.; Eddy, T.L.; Anderson, G.L.

1992-01-01T23:59:59.000Z

234

Corrective Action Plan for INEL low-level waste management ES&H vulnerabilities  

SciTech Connect

Low-level waste (LLW) activities at INEL include numerous waste generators, storage facilities, three treatment facilities, and one disposal facility. The Working Group Assessment Team (WGAT) conducted an assessment of the LLW management program in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-2 (Conformance with Safety Standards at Department of Energy Low-Level Nuclear Waste and Disposal Facilities). Assessment included review of waste generators, liquid effluent treatment, storage facilities and practices, and a disposal facility with vaults and a shallow subsurface burial site. WGAT reviewed relevant documents and conducted tours concerning these LLW operations. The vulnerabilities identified by WGAT were similar to those self-identified by INEL (storage and disposal of LLW). This assessment resulted in the documentation of 8 vulnerabilities and 3 conditions. WGAT assessed the overall LLW/mixed low-level waste (MLLW) management program at INEL as being generally effective. As recommended by DNFSB, a site-specific Corrective Action Plan has been prepared and constitutes the initial site improvement activities.

1996-07-01T23:59:59.000Z

235

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 114: Area 25 EMAD Facility Nevada Test Site, Nevada, Revision 0  

Science Conference Proceedings (OSTI)

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 114, Area 25 EMAD Facility, identified in the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 114 comprises the following corrective action sites (CASs) located in Area 25 of the Nevada Test Site: 25-41-03, EMAD Facility 25-99-20, EMAD Facility Exterior Releases This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 114 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS. It is anticipated that the results of the field investigation and implementation of a corrective action of clean closure will support a defensible recommendation that no further corrective action is necessary. If it is determined that complete clean closure cannot be accomplished during the SAFER, then a hold point will have been reached and the Nevada Division of Environmental Protection (NDEP) will be consulted to determine whether the remaining contamination will be closed under the alternative corrective action of closure in place. This will be presented in a closure report that will be prepared and submitted to NDEP for review and approval. The sites will be investigated based on the data quality objectives (DQOs) developed on April 30, 2009, by representatives of NDEP; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for each CAS in CAU 114. The following text summarizes the SAFER activities that will support the closure of CAU 114: Perform site preparation activities (e.g., utilities clearances, radiological surveys). Collect environmental samples from designated target populations (e.g., stained soil) to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information. Collect samples of materials to determine whether potential source material (PSM) is present that may cause the future release of a COC to environmental media. If no COCs or PSMs are present at a CAS, establish no further action as the corrective action. If COCs exist, collect environmental samples from designated target populations (e.g., clean soil adjacent to contaminated soil) and submit for laboratory analyses to define the extent of COC contamination. If a COC or PSM is present at a CAS, either: - Establish clean closure as the corrective action. The material to be remediated will be removed, disposed of as waste, and verification samples will be collected from remaining soil, or - Establish closure in place as the corrective action and implement the appropriate use restrictions. Confirm the selected closure option is sufficient to protect human health and the environment.

Mark Burmeister

2009-08-01T23:59:59.000Z

236

Development of the environmental management integrated baseline at the Idaho National Engineering Laboratory using systems engineering  

SciTech Connect

The Idaho National Engineering Laboratory (INEL) is one of many Department of Energy (DOE) national laboratories that has been performing environmental cleanup and stabilization, which was accelerated upon the end of the cold war. In fact, the INEL currently receives two-thirds of its scope to perform these functions. However, the cleanup is a highly interactive system that creates an opportunity for systems engineering methodology to be employed. At the INEL, a group called EM (Environmental Management) Integration has been given this charter along with a small core of systems engineers. This paper discusses the progress to date of converting the INEL legacy system into one that uses the systems engineering discipline as the method to ensure that external requirements are met.

Murphy, J.A.; Caliva, R.M.; Wixson, J.R.

1997-10-01T23:59:59.000Z

237

Draft environmental assessment -- Closure of the Waste Calcining Facility (CPP-633), Idaho National Engineering Laboratory  

SciTech Connect

The DOE-Idaho Operations Office has prepared an environmental assessment (EA) to analyze the environmental impacts of closing the Waste Calcining Facility (WCF) at the Idaho National Engineering Laboratory (INEL). The purpose of the action is to reduce the risk of radioactive exposure and release of radioactive and hazardous constituents and eliminate the need for extensive long-term surveillance and maintenance. DOE has determined that the closure is needed to reduce these risks to human health and the environment and to comply with Resource Conservation and Recovery Act requirements. The WCF closure project is described in the DOE Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final Environmental Impact Statement (Programmatic EIS). DOE determined in the Programmatic EIS Record of Decision (ROD) that certain actions would be implemented and other actions deferred. The EA examined the potential environmental impacts of the proposed action and evaluated reasonable alternatives, including the no action alternative in accordance with the Council on Environmental Quality Regulations. Based on the analysis in the EA, the action will not have a significant effect on the human environment.

Braun, J.B.; Irving, J.S.; Staley, C.S.; Stanley, N.

1996-04-01T23:59:59.000Z

238

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 540: Spill Sites Nevada Test Site, Nevada, Rev. No.: 0, with Errata  

SciTech Connect

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses closure for Corrective Action Unit (CAU) 540, Spill Sites, identified in the ''Federal Facility Agreement and Consent Order''. Corrective Action Unit 540 consists of the nine following Corrective Action Sites (CASs) located in Areas 12 and 19 of the Nevada Test Site: (1) 12-44-01, ER 12-1, Well Site Release; (2) 12-99-01, Oil Stained Dirt; (3) 19-25-02, Oil Spill; (4) 19-25-04, Oil Spill; (5) 19-25-05, Oil Spill; (6) 19-25-06, Oil Spill; (7) 19-25-07, Oil Spill; (8) 19-25-08, Oil Spills (3); and (9) 19-44-03, U-19bf Drill Site Release. This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 540 using the SAFER process. The data quality objective process developed for this CAU identified the following expected closure options: (1) investigation and confirmation that no contamination exists above the final action levels (FALs), leading to a no further action declaration; (2) characterization of the nature and extent of contamination, leading to closure in place with use restrictions; or (3) clean closure by remediation and verification. The expected closure options were selected based on available information including contaminants of potential concern (COPC), future land use, and assumed risks. A decision flow process was developed to define an approach necessary to achieve closure. There are two decisions that need to be resolved for closure. Decision I is to conduct an investigation to determine whether COPCs are present in concentrations exceeding the FALs. If COPCs are found to be present above FALs, excavation of the contaminated material will occur with the collection of confirmation samples to ensure removal of contaminants below FALs.

Pastor, Laura

2005-11-01T23:59:59.000Z

239

prairie restoration  

NLE Websites -- All DOE Office Websites (Extended Search)

Amount of Seed Amount of Seed Before you can restore your parcel, you must obtain seed. The amount of seed you will need is directly related to the size of your parcel. When our school did its restoration, the area available to us was a bit larger than a full sized tennis court, about 15 meters by 40 meters. When seed was spread, each square meter of soil needed, by volume, about 500 cubic centimeters of seed to cover it adequately. This is roughly equivalent to a full 8-ounce plastic cup of seed for each square meter quadrat.(A quadrat is a term used in field studies meaning a measured off square of conveniently sized dimensions.) All together the total amount of prairie matrix (a mixture of all types of prairie seeds) we needed, fit easily into about 2 large plastic trash can liners (30-gallon size). For another

240

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 553: Areas 19, 20 Mud Pits and Cellars, Nevada Test Site, Nevada, Rev. No. 0  

SciTech Connect

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions necessary for the closure of Corrective Action Unit (CAU) 553: Areas 19, 20 Mud Pits and Cellars, Nevada Test Site (NTS), Nevada. It has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. A SAFER may be performed when the following criteria are met: (1) Conceptual corrective actions are clearly identified (although some degree of investigation may be necessary to select a specific corrective action before completion of the Corrective Action Investigation [CAI]); (2) Uncertainty of the nature, extent, and corrective action must be limited to an acceptable level of risk; (3) The SAFER Plan includes decision points and criteria for making data quality objective (DQO) decisions. The purpose of the investigation will be to document and verify the adequacy of existing information; to affirm the decision for clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. This SAFER Plan identifies decision points developed in cooperation with the Nevada Department of Environmental Protection (NDEP), where the DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) will reach consensus with the NDEP before beginning the next phase of work. Corrective Action Unit 553 is located in Areas 19 and 20 of the NTS, approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 553 is comprised of the four Corrective Action Sites (CASs) shown on Figure 1-1 and listed below: 19-99-01, Mud Spill; 19-99-11, Mud Spill; 20-09-09, Mud Spill; and 20-99-03, Mud Spill. There is sufficient information and process knowledge from historical documentation and investigations of similar sites (i.e., the expected nature and extent of contaminants of potential concern [COPCs]) to recommend closure of CAU 553 using the SAFER process (FFACO, 1996).

Boehlecke, Robert F.

2006-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "inel environmental restoration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 356: Mud Pits and Disposal Sites, Nevada Test Site, Nevada (Revision No. 0, August 2001)  

Science Conference Proceedings (OSTI)

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions necessary for the characterization and closure of Corrective Action Unit (CAU) 356, Mud Pits and Disposal Sites, as identified in the Federal Facility Agreement and Consent Order (FFACO). The CAU, located on the Nevada Test Site in Nevada, consists of seven Corrective Action Sites (CASs): CAS 03-04-01, Area 3 Change House Septic System; CAS 03-09-01, Mud Pit Spill Over; CAS 03-09-03, Mud Pit; CAS 03-09-04, Mud Pit; CAS 03-09-05, Mud Pit; CAS 20-16-01, Landfill; CAS 20-22-21, Drums. Sufficient information and process knowledge from historical documentation and investigations are the basis for the development of the phased approach chosen to address the data collection activities prior to implementing the preferred closure alternative for each CAS. The Phase I investigation will determine through collection of environmental samples from targeted populations (i.e., mud/soil cuttings above textural discontinuity) if contaminants of potential concern (COPCs) are present in concentrations exceeding preliminary action levels (PALs) at each of the CASs. If COPCs are present above PALs, a Phase II investigation will be implemented to determine the extent of contamination to support the appropriate corrective action alternative to complete closure of the site. Groundwater impacts from potentially migrating contaminants are not expected due to the depths to groundwater and limiting hydrologic drivers of low precipitation and high evaporation rates. Future land-use scenarios limit future uses to industrial activities; therefore, future residential uses are not considered. Potential exposure routes to site workers from contaminants of concern in septage and soils include oral ingestion, inhalation, or dermal contact (absorption) through in-advertent disturbance of contaminated structures and/or soils. Diesel within drilling muds is expected to be the primary COPC based on process knowledge. Recirculation processes within the mud pits enhance volatilization of volatile organic compounds (VOCs), thereby reducing the potential concentrations of any VOCs that may be present. A secondary source of contaminants from random truck dumping activities and leaking vehicle discharge may have released fuels, grease, motor oil, and hydraulic fluids into the mud pit effluent stream. Radionuclide contamination is not expected at these CASs based on historical information. The primary radioisotopes that could be expected, if present, are cesium-137, tritium, and strontium-90. The SAFER process ends with closure of the site based on the laboratory analytical results of the environmental samples. There is sufficient information and process knowledge from historical documentation regarding the expected nature and extent of potential contaminants to recommend closure of CAU 356 using the SAFER process. On completion of the field activities, a Closure Report will be prepared and submitted to the Nevada Division of Environmental Protection for review and approval.

U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)

2001-08-21T23:59:59.000Z

242

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 465: Hydronuclear Nevada National Security Site, Nevada, with ROTC 1, Revision 0  

SciTech Connect

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 465, Hydronuclear, identified in the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 465 comprises the following four corrective action sites (CASs) located in Areas 6 and 27 of the Nevada National Security Site: (1) 00-23-01, Hydronuclear Experiment; (2) 00-23-02, Hydronuclear Experiment; (3) 00-23-03, Hydronuclear Experiment; (4) 06-99-01, Hydronuclear. The sites will be investigated based on the data quality objectives (DQOs) developed on July 6, 2011, by representatives of the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for each CAS in CAU 465. For CAU 465, two potential release components have been identified. The subsurface release component includes potential releases of radiological and nonradiological contaminants from the subsurface hydronuclear experiments and disposal boreholes. The surface release component consists of other potential releases of radiological and nonradiological contaminants to surface soils that may have occurred during the pre- and post-test activities. This plan provides the methodology for collection of the necessary information for closing each CAS component. There is sufficient information and process knowledge from historical documentation, contaminant characteristics, existing regional and site groundwater models, and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 465 using the SAFER process. For potential subsurface releases, flow and transport models will be developed to integrate existing data into a conservative description of contaminant migration in the unsaturated zone from the hydronuclear experiments and disposal boreholes. For the potential surface releases, additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS component. It is anticipated that results of the flow and transport models, the field investigation, and implementation of the corrective action of closure in place will support a defensible recommendation that no further corrective action is necessary. This will be presented in a closure report that will be prepared and submitted to NDEP for review and approval. The following text summarizes the SAFER activities that will support the closure of CAU 465: (1) Perform site preparation activities (e.g., utilities clearances, and radiological and visual surveys). (2) Move or remove and dispose of debris at various CASs, as required. (3) Collect environmental samples from designated target populations (e.g., stained soil) to confirm or disprove the presence of contaminants of concern as necessary to supplement existing information. (4) Evaluate and analyze existing data to develop conservative flow and transport models to simulate the potential for contaminant migration from the hydronuclear experiments and disposal boreholes to the water table within 1,000 years. (5) Confirm the preferred closure option (closure in place with use restrictions) is sufficient to protect human health and the environment.

Patrick Matthews

2011-11-01T23:59:59.000Z

243

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 177: Mud Pits and Cellars, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses closure for Corrective Action Unit (CAU) 177, Mud Pits and Cellars, identified in the ''Federal Facility Agreement and Consent Order''. Corrective Action Unit 177 consists of the 12 following Corrective Action Sites (CASs) located in Areas 8, 9, 19, and 20 of the Nevada Test Site: (1) 08-23-01, Mud Pit and Cellar; (2) 09-09-41, Unknown No.3 Mud Pit/Disposal Area; (3) 09-09-45, U-9bz PS No.1A Mud Pit (1) and Cellar; (4) 09-23-05, Mud Pit and Cellar; (5) 09-23-08, Mud Pit and Cellar; (6) 09-23-09, U-9itsx20 PS No.1A Cellar; (7) 10-23-02, Mud Pit and Cellar; (8) 10-23-03, Mud Pit and Cellar; (9) 19-23-01, Mud Pit and Cellar; (10) 19-23-02, Cellar and Waste Storage Area; (11) 19-23-03, Cellar with Casing; and (12) 20-23-07, Cellar. This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 177 using the SAFER process. The data quality objective process developed for this CAU identified the following expected closure options: (1) investigation and confirmation that no contamination exists above the preliminary action levels (PALs), leading to a no further action declaration, or (2) characterization of the nature and extent of contamination, leading to closure in place with use restrictions. The expected closure options were selected based on available information including contaminants of potential concern, future land use, and assumed risks. A decision flow process was developed to outline the collection of data necessary to achieve closure. There are two decisions that need to be answered for closure. Decision I is to determine whether contaminants of potential concern are present in concentrations exceeding the PALs. If contaminants of potential concern are found to be present above PALs, Decision II will be to determine the extent of contamination and generate the information necessary to close the site in place and implement the appropriate administrative controls (i.e., use restrictions). The following text summarizes the types of activities that will support the closure of CAU 177: (1) Perform site preparation activities (e.g., boundary setup, utility clearances, vegetation removal, movement/removal of fencing and debris). (2) Remove non-hazardous debris at various CASs, as required. (3) Collect environmental samples of residual drilling mud and soil using probabilistic (mud pits) and judgmental (cellars) sampling to confirm or disprove the presence of contaminants of concern (COCs) (i.e., nature of contamination) if these data do not already exist. Collect environmental samples from designated target populations (e.g., clean soil adjacent to contaminated soil if COCs exist) and submit for laboratory analyses to define the extent of COC contamination. (4) Establish no further action as the corrective action if no contaminants are detected above final action levels. (5) If COCs are present at a CAS, establish the corrective action and implement appropriate use restrictions. (6) Confirm the preferred closure option is sufficient to protect human health and the environment. (7) Document all closure activities for CAU 177 in a Closure Report.

Alfred Wickline

2006-06-01T23:59:59.000Z

244

Environmental Statements, Availability, Etc., Programmatic Spent...  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Environmental Statements, Availability, Etc.; Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste...

245

Office of Environmental Management | Department of Energy  

Office of Environmental Management (EM)

Environmental Management Search form Search Office of Environmental Management Services Waste Management Site & Facility Restoration Program Management Communication & Engagement...

246

Addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 452: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, Revision 0  

SciTech Connect

This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 452: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: This page that refers the reader to the SIR document for additional information The cover, title, and signature pages of the SIR document The NDEP approval letter The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: 25-25-09, Spill H940825C (from UST 25-3101-1) 25-25-14, Spill H940314E (from UST 25-3102-3) 25-25-15, Spill H941020E (from UST 25-3152-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.

Grant Evenson

2009-05-01T23:59:59.000Z

247

Addendum 2 to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, Revision 0  

SciTech Connect

This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: This page that refers the reader to the SIR document for additional information The cover, title, and signature pages of the SIR document The NDEP approval letter The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: 12-25-08, Spill H950524F (from UST 12-B-1) 12-25-10, Spill H950919A (from UST 12-COMM-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.

Grant Evenson

2009-05-01T23:59:59.000Z

248

Summary of INEL research on the iron-enriched basalt waste form  

Science Conference Proceedings (OSTI)

This report summarizes the knowledge base on the iron-enriched basalt (IEB) waste form developed at the Idaho National Engineering Laboratory (INEL) during 1979--1982. The results presented discuss the applicability of IEB in converting retrieved transuranic (TRU) waste from INEL's Radioactive Waste Management Complex (RWMC) into a vitreous/ceramic (glassy/rock) stable waste form suitable for permanent disposal in an appropriate repository, such as the Waste Isolation Pilot Plant (WIPP) in New Mexico. Borosilicate glass (BSG), the approved high-level waste form, appears unsuited for this application. Melting the average waste-soil mix from the RWMC produces the IEB composition and attempting to convert IEB to the BSG composition would require additions of substantial B{sub 2}0{sub 3}, Na, and SiO{sub 2} (glass frit). IEB requires processing temperatures of 1400 to 1600{degrees}C, depending upon the waste composition. Production of the IEB waste form, using Joule heated melters, has proved difficult in the past because of electrode and refractory corrosion problems associated with the high temperature melts. Higher temperature electric melters (arc and plasma) are available to produce this final waste form. Past research focused on extensive slag property measurements, waste form leachability tests, mechanical, composition, and microstructure evaluations, as well as a host of experiments to improve production of the waste form. Past INEL studies indicated that the IEB glass-ceramic is a material that will accommodate and stabilize a wide range of heterogeneous waste materials, including long lived radionuclides and scrap metals, while maintaining a superior level of chemical and physical performance characteristics. Controlled cooling of the molten IEB and subsequent heat treatment will produce a glass-ceramic waste form with superior leach resistance.

Reimann, G.A.; Grandy, J.D.; Eddy, T.L.; Anderson, G.L.

1992-01-01T23:59:59.000Z

249

Performance-Based Technology Selection Filter description report. INEL Buried Waste Integrated Demonstration System Analysis project  

SciTech Connect

A formal methodology has been developed for identifying technology gaps and assessing innovative or postulated technologies for inclusion in proposed Buried Waste Integrated Demonstration (BWID) remediation systems. Called the Performance-Based Technology Selection Filter, the methodology provides a formalized selection process where technologies and systems are rated and assessments made based on performance measures, and regulatory and technical requirements. The results are auditable, and can be validated with field data. This analysis methodology will be applied to the remedial action of transuranic contaminated waste pits and trenches buried at the Idaho National Engineering Laboratory (INEL).

O`Brien, M.C.; Morrison, J.L.; Morneau, R.A.; Rudin, M.J.; Richardson, J.G.

1992-05-01T23:59:59.000Z

250

National Environmental Policy Act guidance: A model process  

Science Conference Proceedings (OSTI)

The ``Model National Environmental Policy Act (NEPA) Process`` includes: References to regulations, guidance documents, and plans; training programs; procedures; and computer databases. Legislative Acts and reference documents from Congress, US Department of Energy, and Lockheed Idaho Technologies Company provide the bases for conducting NEPA at the Idaho National Engineering Laboratory (INEL). Lockheed Idaho Technologies Company (LITCO) NEPA / Permitting Department, the Contractor Environmental Organization (CEO) is responsible for developing and maintaining LITCO NEPA and permitting policies, guidance, and procedures. The CEO develops procedures to conduct environmental evaluations based on NEPA, Council on Environmental Quality (CEQ) regulations, and DOE guidance. This procedure includes preparation or support of environmental checklists, categorical exclusion determinations, environmental assessment determinations, environmental assessments, and environmental impact statements. In addition, the CEO uses this information to train personnel conducting environmental evaluations at the INEL. Streamlining these procedures fosters efficient use of resources, quality documents, and better decisions on proposed actions.

Angle, B.M.; Lockhart, V.A.T.; Sema, B.; Tuott, L.C.; Irving, J.S.

1995-04-01T23:59:59.000Z

251

Occupational radiation exposure history of Idaho Field Office Operations at the INEL  

Science Conference Proceedings (OSTI)

An extensive review has been made of the occupational radiation exposure records of workers at the Idaho National Engineering Laboratory (INEL) over the period of 1951 through 1990. The focus has been on workers employed by contractors and employees of the Idaho Field Operations Office (ID) of the United States Department of Energy (USDOE) and does not include the Naval Reactors Facility (NRF), the Argonne National Laboratory (ANL), or other operations field offices at the INEL. The radiation protection guides have decreased from 15 rem/year to 5 rem/year in 1990 for whole body penetrating radiation exposure. During these 40 years of nuclear operations (in excess of 200,000 man-years of work), a total of twelve individuals involved in four accidents exceeded the annual guidelines for exposure; nine of these exposures were received during life saving efforts on January 3, 1961 following the SL-1 reactor accident which killed three military personnel. These exposures ranged from 8 to 27 rem. Only one individual has exceeded the annual whole body penetrating radiation protection guidelines in the last 29 years.

Horan, J.R.; Braun, J.B.

1993-10-01T23:59:59.000Z

252

Treatability studies for polyethylene encapsulation of INEL low-level mixed wastes. Final report  

SciTech Connect

Treatability studies for polyethylene encapsulation of Idaho National Engineering Laboratory (INEL) low-level mixed wastes were conducted at Brookhaven National Laboratory. The treatability work, which included thermal screening and/or processibility testing, was performed on priority candidate wastes identified by INEL to determine the applicability of polyethylene encapsulation for the solidification and stabilization of these mixed wastes. The candidate wastes selected for this preliminary study were Eutectic Salts, Ion Exchange Resins, Activated Carbons, Freon Contaminated Rags, TAN TURCO Decon 4502, ICPP Sodium Bearing Liquid Waste, and HTRE-3 Acid Spill Clean-up. Thermal screening was conducted for some of these wastes to determine the thermal stability of the wastes under expected pretreatment and processing conditions. Processibility testing to determine whether the wastes were amenable to extrusion processing included monitoring feed consistency, extruder output consistency, waste production homogeneity, and waste form performance. Processing parameters were not optimized within the scope of this study. However, based on the treatability results, polyethylene encapsulation does appear applicable as a primary or secondary treatment for most of these wastes.

Lageraaen, P.R.; Patel, B.R.; Kalb, P.D.; Adams, J.W.

1995-10-01T23:59:59.000Z

253

Streamlined Approach for Environmental Restoration Work Plan for Corrective Action Unit 461: Joint Test Assembly Sites and Corrective Action Unit 495: Unconfirmed Joint Test Assembly Sites Tonopah Test Range, Nevada  

SciTech Connect

This Streamlined Approach for Environmental Restoration plan addresses the action necessary for the clean closure of Corrective Action Unit 461 (Test Area Joint Test Assembly Sites) and Corrective Action Unit 495 (Unconfirmed Joint Test Assembly Sites). The Corrective Action Units are located at the Tonopah Test Range in south central Nevada. Closure for these sites will be completed by excavating and evaluating the condition of each artillery round (if found); detonating the rounds (if necessary); excavating the impacted soil and debris; collecting verification samples; backfilling the excavations; disposing of the impacted soil and debris at an approved low-level waste repository at the Nevada Test Site

Jeff Smith

1998-08-01T23:59:59.000Z

254

Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 116: Area 25 Test Cell C Facility, Nevada Test Site, Nevada, Revision 1  

Science Conference Proceedings (OSTI)

This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for the closure of Corrective Action Unit (CAU) 116, Area 25 Test Cell C Facility. The Test Cell C (TCC) Facility is located in Area 25 of the Nevada Test Site (NTS) approximately 25 miles northwest of Mercury, Nevada (Figure 1). CAU 116 is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) of 1996 (as amended February 2008) and consists of two Corrective Action Sites (CASs): (1) CAS 25-23-20, Nuclear Furnace Piping; and (2) CAS 25-41-05, Test Cell C Facility. CAS 25-41-05 is described in the FFACO as the TCC Facility but actually includes Building 3210 and attached concrete shield wall only. CAU 116 will be closed by demolishing Building 3210, the attached concrete shield wall, and the nuclear furnace piping. In addition, as a best management practice (BMP), Building 3211 (moveable shed) will be demolished due to its close proximity to Building 3210. This will aid in demolition and disposal operations. Radiological surveys will be performed on the demolition debris to determine the proper disposal pathway. As much of the demolition debris as space allows will be placed into the Building 3210 basement structure. After filling to capacity with demolition debris, the basement structure will be mounded or capped and closed with administrative controls. Prior to beginning demolition activities and according to an approved Sampling and Analysis Plan (SAP), representative sampling of surface areas that are known, suspected, or have the potential to contain hazardous constituents such as lead or polychlorinated biphenyls (PCBs) will be performed throughout all buildings and structures. Sections 2.3.2, 4.2.2.2, 4.2.2.3, 4.3, and 6.2.6.1 address the methodologies employed that assure the solid debris placed in the basement structure will not contain contaminants of concern (COCs) above hazardous waste levels. The anticipated post-closure-posting requirements for the mounded/capped basement structure, as well as for the entire CAU, are addressed in Section 4.2.10. The site contains radiologically impacted surfaces and hazardous materials. Based on review of the historical information for CAU 116 and recent site inspections, there is sufficient process knowledge to close CAU 116 using the SAFER process. CAUs that may be closed using the SAFER process have conceptual corrective actions that are clearly identified. Consequently, corrective action alternatives can be chosen prior to completing a corrective action investigation, given anticipated investigation results. The SAFER process combines elements of the data quality objective (DQO) process and the observational approach to plan and conduct closure activities. The DQOs are used to identify the problem and define the type and quality of data needed to complete the investigation phase of the SAFER process. The purpose of the investigation phase is to verify the adequacy of existing information used to determine the chosen corrective action. The observational approach provides a framework for managing uncertainty during the planning and decision-making phases of the project. The SAFER process allows for technical decisions to be made based on information gathered during site visits, interviews, meetings, research, and a consensus of opinion by the decontamination and decommissioning (D&D) team members. Any uncertainties are addressed by documented assumptions that are verified by sampling and analysis, data evaluation, onsite observations, and contingency plans, as necessary. Closure activities may proceed simultaneously with site characterization as sufficient data are gathered to confirm or disprove the assumptions made during selection of the corrective action. If, at any time during the closure process, new information is discovered that indicates that closure activities should be revised, closure activities will be reevaluated as appropriate. Based on a detailed review of historical documentation, there is sufficient process know

NSTec Environmental Restoration

2008-12-01T23:59:59.000Z

255

Past Restoration Fund Info  

NLE Websites -- All DOE Office Websites (Extended Search)

Rates > Past Restoration Rates > Past Restoration Fund Info Past Restoration Fund Info FY 2013 Restoration Fund SNR Letter to Customers Regarding Revision to FY13 Restoration Fund Obligation Mid-Year Adjustment (June 19, 2013) (PDF - 1146 KB) SNR Letter to Customers Regarding FY13 Restoration Fund Obligation Mid-Year Adjustment (April 15, 2013) (PDF - 829 KB) SNR Letter to Customers Regarding Restoration Fund Obligations for FY 2013 (August 8, 2012) (PDF - 325 KB) FY 2012 Restoration Fund SNR Letter to Customers Regarding Restoration Fund Obligations for FY 2012 (August 9, 2011) (PDF - 340 KB) Mid Year Adjustment to the FY 2012 Restoration Fund Payment (April 18, 2012) (PDF - 174 KB) FY 2011 Restoration Fund SNR Letter to Customers Regarding Restoration Fund Obligations for FY 2011 (August 20, 2010) (PDF - 705 KB)

256

INEL Operable Unit 7-13 Retrieval/Ex Situ Thermal Treatment configuration options: INEL Buried Waste Integrated Demonstration Systems Analysis project  

SciTech Connect

The mission of the Buried Waste Integrated Demonstration (BWID) Systems Analysis project is to identify and evaluate cradle-to-grave systems for the remediation of Transuranic (TRU)Contaminated Waste Pits and Trenches within the Subsurface Disposal Area (SDA) of the Radioactive Waste Management Complex (RWMC) at the Idaho National Engineering Laboratory (INEL). The BWID program will use the results of the BWID Systems Analysis in conjunction with identified Department of Energy (DOE) Complex buried waste needs to develop a long-term strategy for improving buried waste remediation capabilities throughout the DOE system. This report presents Buried Waste Retrieval/Ex Situ Thermal Treatment configuration option concepts in the form of block diagrams. These configuration options are: Retrieval/Melter Treatment; Retrieval/Metal Sort/Thermal Treatment; Retrieval/No Sort/Incineration/Melter Treatment; Retrieval/Interim Storage/Melter Treatment; Retrieval/Interim Storage/Metal Sort/Thermal Treatment; and Retrieval/Interim Storage/No Sort/Incineration/Melter Treatment. Each option is presented as a complete end-to-end system.

Richardson, J.G.; Rudin, M.J.; O' Brien, M.C.; Morrison, J.L.; Raivo, B.

1992-07-01T23:59:59.000Z

257

Native Grass Restoration Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Reader pdf format) on the Oak Ridge Reservation. Native Grass Restoration Projects Power Line Right-of-Way Roadside Re-Vegetation Riparian Restoration SNS Entrance Habitat...

258

Comprehensive Everglades Restoration Plan Regulation Act (Florida) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comprehensive Everglades Restoration Plan Regulation Act (Florida) Comprehensive Everglades Restoration Plan Regulation Act (Florida) Comprehensive Everglades Restoration Plan Regulation Act (Florida) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Multi-Family Residential Municipal/Public Utility Nonprofit Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Florida Program Type Environmental Regulations Siting and Permitting Provider Florida Department of Environmental Protection

259

Quality Assurance Project Plan for the Gas Generation Testing Program at the INEL  

SciTech Connect

The data quality objectives (DQOs) for the Program are to evaluate compliance with the limits on total gas generation rates, establish the concentrations of hydrogen and methane in the total gas flow, determine the headspace concentration of VOCs in each drum prior to the start of the test, and obtain estimates of the concentrations of several compounds for mass balance purposes. Criteria for the selection of waste containers at the INEL and the parameters that must be characterized prior to and during the tests are described. Collection of gaseous samples from 55-gallon drums of contact-handled transuranic waste for the gas generation testing is discussed. Analytical methods and calibrations are summarized. Administrative quality control measures described in this QAPjP include the generation, review, and approval of project documentation; control and retention of records; measures to ensure that personnel, subcontractors or vendors, and equipment meet the specifications necessary to achieve the required data quality for the project.

NONE

1994-10-01T23:59:59.000Z

260

Summary of ground water and surface water flow and contaminant transport computer codes used at the Idaho National Engineering Laboratory (INEL). [Contaminant transport computer codes  

SciTech Connect

This report presents information on computer codes for numerical and analytical models that have been used at the Idaho National Engineering Laboratory (INEL) to model ground water and surface water flow and contaminant transport. Organizations conducting modeling at the INEL include: EG G Idaho, Inc., US Geological Survey, and Westinghouse Idaho Nuclear Company. Information concerning computer codes included in this report are: agency responsible for the modeling effort, name of the computer code, proprietor of the code (copyright holder or original author), validation and verification studies, applications of the model at INEL, the prime user of the model, computer code description, computing environment requirements, and documentation and references for the computer code.

Bandy, P.J.; Hall, L.F.

1993-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "inel environmental restoration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Summary of ground water and surface water flow and contaminant transport computer codes used at the Idaho National Engineering Laboratory (INEL). Version 1.0  

SciTech Connect

This report presents information on computer codes for numerical and analytical models that have been used at the Idaho National Engineering Laboratory (INEL) to model ground water and surface water flow and contaminant transport. Organizations conducting modeling at the INEL include: EG&G Idaho, Inc., US Geological Survey, and Westinghouse Idaho Nuclear Company. Information concerning computer codes included in this report are: agency responsible for the modeling effort, name of the computer code, proprietor of the code (copyright holder or original author), validation and verification studies, applications of the model at INEL, the prime user of the model, computer code description, computing environment requirements, and documentation and references for the computer code.

Bandy, P.J.; Hall, L.F.

1993-03-01T23:59:59.000Z

262

Idaho National Engineering Laboratory site environmental report for calendar year 1995  

Science Conference Proceedings (OSTI)

This report presents a compilation of data collected in 1995 for the routine environmental surveillance programs conducted on and around the Idaho National Engineering Laboratory (INEL). During 1995, the offsite surveillance program was conducted by the Environmental Science and Research Foundation. Onsite surveillance was performed by Lockheed Idaho Technologies Company (LITCO). Ground-water monitoring, both on and offsite, was performed by the US Geological Survey (USGS). This report also presents summaries of facility effluent monitoring data collected by INEL contractors. This report, prepared in accordance with the requirements in DOE Order 5400.1, is not intended to cover the numerous special environmental research programs being conducted at the INEL by the Foundation, LITCO, USGS, and others.

Mitchell, R.G.; Peterson, D.; Hoff, D.L.

1996-08-01T23:59:59.000Z

263

MLW, TRU, LLW, MIXED, HAZARDOUS WASTES AND ENVIRONMENTAL RESTORATION. WASTE MANAGEMENT/ENERGY SECURITY AND A CLEAN ENVIRONMENT. DFR Decommissioning: the Breeder Fuel Processing  

SciTech Connect

The Dounreay site, in North Scotland, was opened in 1955 and a wide range of nuclear facilities have been built and operated there by UKAEA (The United Kingdom Atomic Energy Authority) for the development of atomic energy research. The Dounreay Fast Reactor (DFR) was built between 1955 and 1957, and operated until 1977 for demonstration purposes and for producing electricity. Today, its decommissioning is a key part of the whole Dounreay Site Restoration Plan that integrates the major decommissioning activities such as the fuel treatment and the waste management. The paper presents the contract strategy and provides an overview of the BFR project which consists in the removal of the breeder elements from the reactor and their further treatment. It mainly provides particular details of the Retrieval and Processing Facilities design.

Bonnet, C.; Potier, P.; Ashton, Brian Morris

2003-02-27T23:59:59.000Z

264

RCRA Facility Investigation report for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 1, Sections 1 through 3: Environmental Restoration Program  

Science Conference Proceedings (OSTI)

WAG 6 comprises a shallow land burial facility used for disposal of low-level radioactive wastes (LLW) and, until recently, chemical wastes. As such, the site is subject to regulation under RCRA and the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). To comply with these regulations, DOE, in conjunction with the Environmental Protection Agency (EPA) and the Tennessee Department of Environment and Conservation (TDEC), developed a strategy for closure and remediation of WAG 6 by 1997. A key component of this strategy was to complete an RFI by September 1991. The primary objectives of the RFI were to evaluate the site`s potential human health and environmental impacts and to develop a preliminary list of alternatives to mitigate these impacts. The WAG 6 one of three solid waste management units evaluated Oak Ridge National Laboratory (ORNL) existing waste disposal records and sampling data and performed the additional sampling and analysis necessary to: describe the nature and extent of contamination; characterize key contaminant transport pathways; and assess potential risks to human health and the environment by developing and evaluating hypothetical receptor scenarios. Estimated excess lifetime cancer risks as a result for exposure to radionuclides and chemicals were quantified for each hypothetical human receptor. For environmental receptors, potential impacts were qualitatively assessed. Taking into account regulatory requirements and base line risk assessment results, preliminary site closure and remediation objectives were identified, and a preliminary list of alternatives for site closure and remediation was developed.

Not Available

1991-09-01T23:59:59.000Z

265

Idaho National Engineering Laboratory Site environmental report for Calendar Year 1994  

Science Conference Proceedings (OSTI)

This report presents a compilation of data collected in 1994 for routine environmental surveillance programs conducted on and around INEL. EG&G conducted the onsite surveillance program January-- September; Lockheed Idaho conducted the program October--December. The offsite surveillance program was conducted by the Environmental Science and Research Foundation. Ground water monitoring (both on and off site) was performed by USGS. This report presents summaries of facility effluent monitoring data collected by INEL contractors. It includes collection of foodstuffs at the INEL boundary and distant offsite locations, and the collection of air and water samples at onsite locations and offsite boundary and distant locations. The report also compares and evaluates the sample results to federal regulations and standards.

Mitchell, R.G.; Peterson, D. [Environmental Science and Research Foundation, Idaho Falls, ID (United States); Hoff, D.L. [USDOE Idaho Operations Office, Idaho Falls, ID (United States)

1995-07-01T23:59:59.000Z

266

The Idaho National Engineering Laboratory Site environmental report for calendar year 1992  

Science Conference Proceedings (OSTI)

The results of the various monitoring programs for 1992 indicate that most radioactivity from the INEL operations could not be distinguished from worldwide fallout and natural radioactivity in the region surrounding the INEL Site. Although some radioactive materials were discharged during Site operations, concentrations and doses to the surrounding population were of no health consequence and were far less than State of Idaho and Federal health protection guidelines. The first section of the report summarizes INEL activities related to compliance with environmental regulations and laws for Calendar Year 1992 and January 1 through April 1, 1993. The major portion of the report summarizes results of the RESL environmental surveillance program, which includes the collection of foodstuffs at the INEL boundary and distant offsite locations, and the collection of air and water samples at onsite locations, offsite boundary, and distant locations. The report also compares and evaluates the sample results to appropriate Federal regulations and standards and discusses implications, if any. The USGS ground-water monitoring program is briefly summarized, and data from USGS reports are included in maps showing the spread of contaminants. Effluent monitoring and nonradiological drinking water monitoring performed by INEL contractors are discussed briefly, and data are summarized in tables.

Hoff, D.L.; Mitchell, R.G.; Moore, R.; Bingham, L.

1993-06-01T23:59:59.000Z

267

Source evaluation report phase 2 investigation: Limited field investigation. Final report: United States Air Force Environmental Restoration Program, Eielson Air Force Base, Alaska  

SciTech Connect

This report describes the limited field investigation work done to address issues and answer unresolved questions regarding a collection of potential contaminant sources at Eielson Air Force Base (AFB), near Fairbanks, Alaska. These sources were listed in the Eielson AFB Federal Facility Agreement supporting the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) cleanup of the base. The limited field investigation began in 1993 to resolve all remaining technical issues and provide the data and analysis required to evaluate the environmental hazard associated with these sites. The objective of the limited field investigation was to allow the remedial project managers to sort each site into one of three categories: requiring remedial investigation/feasibility study, requiring interim removal action, or requiring no further remedial action.

Not Available

1994-10-01T23:59:59.000Z

268

RCRA Facility Investigation report for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 2, Sections 4 through 9: Environmental Restoration Program  

Science Conference Proceedings (OSTI)

This report presents compiled information concerning a facility investigation of waste area group 6(WAG-6), of the solid waste management units (SWMU`s) at Oak Ridge National Laboratory (ORNL). The WAG is a shallow ground disposal area for low-level radioactive wastes and chemical wastes. The report contains information on hydrogeological data, contaminant characterization, radionuclide concentrations, risk assessment and baseline human health evaluation including a toxicity assessment, and a baseline environmental evaluation.

Not Available

1991-09-01T23:59:59.000Z

269

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 357: Mud Pits and Waste Dump, Nevada Test Site, Nevada: Revision 0, Including Record of Technical Change No. 1  

SciTech Connect

This Streamlined Approach for Environmental Restoration (SAFER) plan was prepared as a characterization and closure report for Corrective Action Unit (CAU) 357, Mud Pits and Waste Dump, in accordance with the Federal Facility Agreement and Consent Order. The CAU consists of 14 Corrective Action Sites (CASs) located in Areas 1, 4, 7, 8, 10, and 25 of the Nevada Test Site (NTS). All of the CASs are found within Yucca Flat except CAS 25-15-01 (Waste Dump). Corrective Action Site 25-15-01 is found in Area 25 in Jackass Flat. Of the 14 CASs in CAU 357, 11 are mud pits, suspected mud pits, or mud processing-related sites, which are by-products of drilling activities in support of the underground nuclear weapons testing done on the NTS. Of the remaining CASs, one CAS is a waste dump, one CAS contains scattered lead bricks, and one CAS has a building associated with Project 31.2. All 14 of the CASs are inactive and abandoned. Clean closure with no further action of CAU 357 will be completed if no contaminants are detected above preliminary action levels. A closure report will be prepared and submitted to the Nevada Division of Environmental Protection for review and approval upon completion of the field activities. Record of Technical Change No. 1 is dated 3/2004.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

2003-06-25T23:59:59.000Z

270

Report of the workshop Great Lakes climate change impacts: Implications for environmental restoration. Held in Boulder, Colorado on April 28-29, 1992  

SciTech Connect

The broad objective of the one and a half day workshop was to provide a forum for interactive discussions and exchange of information among three distinct communities with a shared interest in the Great Lakes basin, but which have little occasion for direct communication. The three communities represented at the workshop were: (1) climate modeling researchers; (2) climate impacts researchers; and (3) individuals involved in the development of long-term environmental policy for the Great Lakes region-more specifically, those participating in the development of Remedial Action Plans (RAPs) for designated Areas of Concern (AOCs).

Mearns, L.O.; Rhodes, S.L.

1993-03-01T23:59:59.000Z

271

Postconstruction report of the United Nuclear Corporation Disposal Site at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program  

Science Conference Proceedings (OSTI)

Remedial actions conducted under the auspices of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) were completed at the Y-12 United Nuclear Corporation (UNC) Disposal Site in August 1992. The purpose of this Postconstruction Report is to summarize numerous technical reports and provide CERCLA documentation for completion of the remedial actions. Other CERCLA reports, such as the Feasibility Study for the UNC Disposal Site, provide documentation leading up to the remedial action decision. The remedial action chosen, placement of a modified RCRA cap, was completed successfully, and performance standards were either met or exceeded. This remedial action provided solutions to two environmentally contaminated areas and achieved the goal of minimizing the potential for contamination of the shallow groundwater downgradient of the site, thereby providing protection of human health and the environment. Surveillance and maintenance of the cap will be accomplished to ensure cap integrity, and groundwater monitoring downgradient of the site will continue to confirm the acceptability of the remedial action chosen.

Oakley, L.B.; Siberell, J.K.; Voskuil, T.L.

1993-06-01T23:59:59.000Z

272

ENVIRONMENTAL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

797 797 FINAL ENVIRONMENTAL ASSESSMENT FOR DEPARTMENT OF ENERGY LOAN GUARANTEE FOR THE AGUA CALIENTE SOLAR PROJECT IN YUMA COUNTY, ARIZONA U.S. Department of Energy Loan Guarantee Program Office Washington, DC 20585 November 2010 TABLE OF CONTENTS Section Page Executive Summary .................................................................................................................ES-1 Introduction ..........................................................................................................................ES-1 Purpose and Need ...............................................................................................................ES-1 Proposed Action and Alternatives........................................................................................ES-2

273

Watershed Restoration Project  

DOE Green Energy (OSTI)

In 2003, the U.S. Department of Energy issued the Eastern Nevada Landscape Coalition (ENLC) funding to implement ecological restoration in Gleason Creek and Smith Valley Watersheds. This project was made possible by congressionally directed funding that was provided through the US Department of Energy, Energy Efficiency and Renewable Energy, Office of the Biomass Program. The Ely District Bureau of Land Management (Ely BLM) manages these watersheds and considers them priority areas within the Ely BLM district. These three entities collaborated to address the issues and concerns of Gleason Creek and Smith Valley and prepared a restoration plan to improve the watersheds ecological health and resiliency. The restoration process began with watershed-scale vegetation assessments and state and transition models to focus on restoration sites. Design and implementation of restoration treatments ensued and were completed in January 2007. This report describes the restoration process ENLC undertook from planning to implementation of two watersheds in semi-arid Eastern Nevada.

Julie Thompson; Betsy Macfarlan

2007-09-27T23:59:59.000Z

274

Environmental Management Root Cause Analysis Corrective Action...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Skip to main content Energy.gov Office of Environmental Management Search form Search Office of Environmental Management Services Waste Management Site & Facility Restoration...

275

OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) ORGANIZATION CHART |...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Skip to main content Energy.gov Office of Environmental Management Search form Search Office of Environmental Management Services Waste Management Site & Facility Restoration...

276

Environmental Management Waste Management Facility (EMWMF) at...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Skip to main content Energy.gov Office of Environmental Management Search form Search Office of Environmental Management Services Waste Management Site & Facility Restoration...

277

Office of Environmental Management (EM) Organization Chart |...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Skip to main content Energy.gov Office of Environmental Management Search form Search Office of Environmental Management Services Waste Management Site & Facility Restoration...

278

Waste Management Plan for the Remedial Investigation of Waste Area Grouping 10, Operable Unit 3, at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program  

Science Conference Proceedings (OSTI)

This Waste Management Plan (WMP) supplements the Remedial Investigation/Feasibility Study (RI/FS) Project WMP and defines the criteria and methods to be used for managing and characterizing waste generated during activities associated with the RI of 23 wells near the Old Hydrofracture Facility (OHF). These wells are within the Waste Area Grouping (WAG) 5 area of contamination (AOC) at Oak Ridge National Laboratory (ORNL). Field activities for the limited RI of Operable Unit (OU) 3 of WAG 10 will involve sampling and measurement of various environmental media (e.g., liquids and gases). Many of these activities will occur in areas known to be contaminated with radioactive materials or hazardous chemical substances, and it is anticipated that contaminated solid and liquid wastes and noncontaminated wastes will be generated as a result of these activities. On a project-wide basis, handling of these waste materials will be accomplished in accordance with the RI/FS Project WMP and the procedures referenced throughout the plan.

Not Available

1993-10-01T23:59:59.000Z

279

Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 1, Appendix D, Part B: Naval spent nuclear fuel management  

SciTech Connect

This volume contains the following attachments: transportation of Naval spent nuclear fuel; description of Naval spent nuclear receipt and handling at the Expended Core Facility at the Idaho National Engineering Laboratory; comparison of storage in new water pools versus dry container storage; description of storage of Naval spent nuclear fuel at servicing locations; description of receipt, handling, and examination of Naval spent nuclear fuel at alternate DOE facilities; analysis of normal operations and accident conditions; and comparison of the Naval spent nuclear fuel storage environmental assessment and this environmental impact statement.

1994-06-01T23:59:59.000Z

280

Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs, Draft Environmental Impact Statement. Volume 1, Appendix D: Part A, Naval Spent Nuclear Fuel Management  

SciTech Connect

Volume 1 to the Department of Energy`s Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Management Programs Environmental Impact Statement evaluates a range of alternatives for managing naval spent nuclear fuel expected to be removed from US Navy nuclear-powered vessels and prototype reactors through the year 2035. The Environmental Impact Statement (EIS) considers a range of alternatives for examining and storing naval spent nuclear fuel, including alternatives that terminate examination and involve storage close to the refueling or defueling site. The EIS covers the potential environmental impacts of each alternative, as well as cost impacts and impacts to the Naval Nuclear Propulsion Program mission. This Appendix covers aspects of the alternatives that involve managing naval spent nuclear fuel at four naval shipyards and the Naval Nuclear Propulsion Program Kesselring Site in West Milton, New York. This Appendix also covers the impacts of alternatives that involve examining naval spent nuclear fuel at the Expended Core Facility in Idaho and the potential impacts of constructing and operating an inspection facility at any of the Department of Energy (DOE) facilities considered in the EIS. This Appendix also considers the impacts of the alternative involving limited spent nuclear fuel examinations at Puget Sound Naval Shipyard. This Appendix does not address the impacts associated with storing naval spent nuclear fuel after it has been inspected and transferred to DOE facilities. These impacts are addressed in separate appendices for each DOE site.

Not Available

1994-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "inel environmental restoration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

STATEMENT OF CONSIDERATIONS REQUEST BY WASTE MANAGEMENT ENVIRONMENTAL SERVICES, INC.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WASTE MANAGEMENT ENVIRONMENTAL SERVICES, INC. WASTE MANAGEMENT ENVIRONMENTAL SERVICES, INC. FOR AN ADVANCE WAIVER OF DOMESTIC AND FOREIGN INVENTION RIGHTS UNDER EG&G IDAHO, INC. SUBCONTRACT NO. EGG-C93-170221, W(A)-93-005, CH-0757 Under this subcontract, Waste Management Environmental Services, Inc. (WMES) will demonstrate key technical features of its proposed Idaho National Engineering Laboratory (INEL) Pit-9 remediation program. Pit-9 is an area in the Radioactive Waste Management Complex at the INEL containing radioactive and hazardous materials in the form of toxic metals and organic materials, including plutonium and americium. Specifically, the subject subcontract is directed toward a Proof-of-Process (POP) demonstration program intended to provide EG&G Idaho, Inc. (EG&G) with additional information that it will use in the

282

EIS-0200: Notice of Intent to Prepare a Programmatic Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE))

Proposed Integrated Environmental Restoration and Waste Management Program, and to Conduct Public Scoping Meetings

283

Temperatures and heat flow in INEL-GT1 and WO-2 boreholes, Snake River Plain, Idaho  

DOE Green Energy (OSTI)

The researchers have logged temperatures in the deep geothermal test at the INEL test site on the eastern Snake River Plains in Idaho (INEL-GT1) three times over a period of 8 years. The first logging was on 8/20/82 when they reached a depth of 2100 m. They were unable to get past the casing shoe at that depth. In 1983 (7/25/83) they relogged the well with a centralizer on the temperature tool and got past the casing hanger to the end of their cable at 2870 m. In both cases the logs were made at a 0.5 m recording interval. In 1990 the researchers relogged the well for a third time and for the first time reached the bottom of the well at 3130 m. In this log the temperatures were measured at 0.2 m intervals. The temperature-depth plots for the last two logs are compared and the gradient logs for the three logs are compared. The differences in temperature are almost too small to see on the plot. The only significant differences are in the depth interval 700 to 1850 m, a section of the hole with a number of fluid disturbances.

Blackwell, D.D. [Southern Methodist Univ., Dallas, TX (United States). Dept. of Geological Sciences

1990-11-01T23:59:59.000Z

284

Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement; Volume 1, Appendix F, Nevada Test Site and Oak Ridge Reservation Spent Nuclear Fuel Management Programs  

Science Conference Proceedings (OSTI)

This volume addresses the interim storage of spent nuclear fuel (SNF) at two US Department of Energy sites, the Nevada Test Site (NTS) and the Oak Ridge Reservation (ORR). These sites are being considered to provide a reasonable range of alternative settings at which future SNF management activities could be conducted. These locations are not currently involved in management of large quantities of SNF; NTS has none, and ORR has only small quantities. But NTS and ORR do offer experience and infrastructure for the handling, processing and storage of radioactive materials, and they do exemplify a broad spectrum of environmental parameters. This broad spectrum of environmental parameters will provide, a perspective on whether and how such location attributes may relate to potential environmental impacts. Consideration of these two sites will permit a programmatic decision to be based upon an assessment of the feasible options without bias, to the current storage sites. This volume is divided into four parts. Part One is the volume introduction. Part Two contains chapters one through five for the NTS, as well as references contained in chapter six. Part Three contains chapters one through five for the ORR, as well as references contained in chapter six. Part Four is summary information including the list of preparers, organizations contacted, acronyms, and abbreviations for both the NTS and the ORR. A Table of Contents, List of Figures, and List of Tables are included in parts Two, Three, and Four. This approach permitted the inclusion of both sites in one volume while maintaining consistent chapter numbering.

NONE

1994-06-01T23:59:59.000Z

285

Environmental renaissance in Pennsylvania  

Science Conference Proceedings (OSTI)

During centuries of rapid growth of the coal mining industry and expanded development in Pennsylvania, trees were felled, streams were diverted and strip mining caused much environmental damage. All that has now changed. The article gives examples of land and water restoration carried out by organizations such as the Susquehanna River Basin Commission, the West Branch Susquehanna Restoration Coalition and the Anthracite Region Independent Power Producers Association. The Pennsylvania Department of Environmental Protection directs and coordinates environmental projects. 5 photos.

Stevens, J.

2009-07-15T23:59:59.000Z

286

Argonne Software Licensing: RESTORE - ANL  

RESTORE. RESTORE is a program management tool that permits the modeling of a required complex set of steps, including time, or costs, to accomplish the repair of a ...

287

Long-term land use future scenarios for the Idaho National Engineering Laboratory  

SciTech Connect

In order to facilitate decision regarding environmental restoration activities at the Idaho National Engineering Laboratory (INEL), the United States Department of Energy, Idaho Operations Office (DOE-ID) conducted analyses to project reasonable future land use scenarios at the INEL for the next 100 years. The methodology for generating these scenarios included: review of existing DOE plans, policy statements, and mission statements pertaining to the INEL; review of surrounding land use characteristics and county developments policies; solicitation of input from local, county, state and federal planners, policy specialists, environmental professionals, and elected officials; and review of environmental and development constraints at the INEL site that could influence future land use.

NONE

1995-08-01T23:59:59.000Z

288

Constraint and Restoring Force  

E-Print Network (OSTI)

Long-lived sensor network applications must be able to self-repair and adapt to changing demands. We introduce a new approach for doing so: Constraint and Restoring Force. CRF is a physics-inspired framework for computing ...

Beal, Jacob

2007-08-24T23:59:59.000Z

289

Estimation theoretical image restoration  

E-Print Network (OSTI)

In this thesis, we have developed an extensive study to evaluate image restoration from a single image, colored or monochromatic. Using a mixture of Gaussian and Poisson noise process, we derived an objective function to ...

Dolne, Jean J

2008-01-01T23:59:59.000Z

290

Supplemental investigations in support of environmental assessments by the Idaho INEL Oversight Program at the Idaho National Engineering Laboratory  

SciTech Connect

this report discusses the second and third year's progress for the project. Included is information on the hydrologic studies in wells, unsaturated zone contamination and transport processes, surface water - groundwater interactions and regional groundwater flow, and air quality testing.

Hill, S.R.

1992-12-01T23:59:59.000Z

291

Brookhaven Graphite Research Reactor | Environmental Restoration Projects |  

NLE Websites -- All DOE Office Websites (Extended Search)

Why Was the BGRR Decommissioned? Why Was the BGRR Decommissioned? BGRR The Brookhaven Graphite Research Reactor (BGRR) at Brookhaven National Laboratory (BNL) was decommissioned to ensure the complex is in a safe and stable condition and to reduce sources of groundwater contamination. The BGRR contained over 8,000 Curies of radioactive contaminants from past operations consisting of primarily nuclear activation products such as hydrogen-3 (tritium) and carbon-14 and fission products cesium-137 and strontium-90. The nature and extent of contamination varied by location depending on historic uses of the systems and components and releases, however, the majority of the contamination (over 99 percent) was bound within the graphite pile and biological shield. Radioactive contamination was identified in the fuel handling system deep

292

Environmental Restoration Disposal Facility Lessons Learned  

SciTech Connect

The purpose of lessons learned is to identify insight gained during a project successes or failures that can be applied on future projects. Lessons learned can contribute to the overall success of a project by building on approaches that have worked well and avoiding previous mistakes. Below are examples of lessons learned during ERDFs ARRA-funded expansion project.

Caulfield, R.

2012-07-12T23:59:59.000Z

293

Brookhaven Graphite Research Reactor | Environmental Restoration Projects |  

NLE Websites -- All DOE Office Websites (Extended Search)

Brookhaven Graphite Research Reactor Documents Brookhaven Graphite Research Reactor Documents Feasibility Study (PDF) Proposed Remedial Action Plan (PDF) Record of Decision (PDF) RD/RA Work Plan for the BGRR Pile (PDF) RD/RA Work Plan for the Bioshield (PDF) RD/RA Work Plan for the BGRR Cap (PDF) Brookhaven Graphite Research Reactor Explanation of Significant Differences (PDF) (4/12) NYSDEC Approval Letter for BGRR ESD (PDF) (5/12) USEPA Approval Letter for BGRR ESD (PDF) (6/12) DOE BGRR ESD Transmittal Letter (PDF) (7/12) Remedial Design Implementation Report (PDF) (12/11) Completion Reports Removal of the Above-Ground Ducts and Preparation of the Instrument House (708) for Removal (PDF) - April 2002 Below-Ground Duct Outlet Air Coolers, Filters and Primary Liner Removal (PDF) - April 2005 Canal and Deep Soil Pockets Excavation and Removal (PDF) - August

294

Small Business Issues for Environmental Restoration Acquisitions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

retainage, close out contracts quicker, release withholding amounts after annual audits, and, in the case of task orders issued under an indefinite quantity, indefinite...

295

High Flux Beam Reactor | Environmental Restoration Projects ...  

NLE Websites -- All DOE Office Websites (Extended Search)

been taken to partially decommission and prepare the HFBR for safe storage. Final decommissioning of the HFBR building will be performed at the completion of the decay period. The...

296

High Flux Beam Reactor | Environmental Restoration Projects ...  

NLE Websites -- All DOE Office Websites (Extended Search)

Reports HFBR Waste Loading Area, Soil Remediation (PDF) - July 2009 HFBR Decommissioning Project, Removal of the Control Rod Blades and Beam Plugs (PDF) - January 2010...

297

Brookhaven Graphite Research Reactor | Environmental Restoration...  

NLE Websites -- All DOE Office Websites (Extended Search)

Brookhaven Graphite Research Reactor(BGRR) BGRR Overview BGRR Complex Description Decommissioning Decision BGRR Complex Cleanup Actions BGRR Documents BGRR Science &...

298

Brookhaven Graphite Research Reactor | Environmental Restoration...  

NLE Websites -- All DOE Office Websites (Extended Search)

of multiple structures and systems that were necessary to operate and maintain the reactor. The most recognizable features of the complex include the Building 701 officeshigh...

299

Operational Issues at the Environmental Restoration Disposal...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ERDF is operated by Stoller Corporation (Stoller) under subcontract to Washington Closure Hanford (WCH). Currently, six disposal cells comprise the ERDF, with four more...

300

Environmental restoration waste materials co-disposal  

Science Conference Proceedings (OSTI)

Co-disposal of radioactive and hazardous waste is a highly efficient and cost-saving technology. The technology used for final treatment of soil-washing size fractionization operations is being demonstrated on simulated waste. Treated material (wasterock) is used to stabilize and isolate retired underground waste disposal structures or is used to construct landfills or equivalent surface or subsurface structures. Prototype equipment is under development as well as undergoing standardized testing protocols to prequalify treated waste materials. Polymer and hydraulic cement solidification agents are currently used for geotechnical demonstration activities.

Phillips, S.J.; Alexander, R.G.; England, J.L.; Kirdendall, J.R.; Raney, E.A.; Stewart, W.E. [Westinghouse Hanford Co., Richland, WA (United States); Dagan, E.B.; Holt, R.G. [Dept. of Energy, Richland, WA (United States). Richland Operations Office

1993-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "inel environmental restoration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Site & Facility Restoration | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Restoration Restoration Site & Facility Restoration Deactivation & Decommissioning (D&D) Deactivation and Decommissioning (D&D) is the process of taking an active/excess/abandoned facility to a final disposition end state. Because of residual radioactivity, other hazardous constituents, and the physical condition of EM's facilities, D&D presents unique hazards that must be addressed from a safety, programmatic, environmental, and technological standpoint. Read more Soil & Groundwater Remediation The U.S. Department of Energy (DOE) manages the largest groundwater and soil remediation effort in the world. The inventory at the DOE sites includes 6.5 trillion liters of contaminated groundwater, an amount equal to about four times the daily U.S. water consumption, and 40 million cubic

302

WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL  

Office of Legacy Management (LM)

WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH FEBRUARY 1999 Final (Revision 0) Department of Energy Babcock & Wilcox of Ohio Mr. Daniel Bird AICP, Planning Manager Miamisburg Mound Community Improvement Corporation 720 Mound Road Miamisburg, Ohio 45342-6714 Dear Mr. Bird: The Core Team, consisting of the U.S. Department of Energy Miamisburg Environmental Management Project (DOE-MEMP), U.S. Environmental Protection Agency (USEPA), and the Ohio Environmental Protection Agency (OEPA), appreciates your comments on the Work

303

prairie restoration index  

NLE Websites -- All DOE Office Websites (Extended Search)

Purpose Purpose This is the first section of a "How to" guide designed for those individuals interested in restoring an area of land back to native prairie. To better facilitate your search for specific information, select one or all of the main topics associated with prairie parcel restoration listed below. Index History/Introduction of Prairie Restoration Selecting a Site Starting/Planning Seedbed Preparation. Seed (Amount, Acquiring and Preparation) Planting Watering General Identification (Grasses, Forbs, Flowers, Keeping Track) Burning - Enriching Reference Materials, Burning Permit and Seed Sources Information Identification Keys - Grasses and Forbs Illustrated Guide to Native Prairie Species Watch List for Native Prairie Plants This report was written by Lawrence Cwik as part of his participation in

304

EA-1932: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment EA-1932: Draft Environmental Assessment Bass Lake Native Fish Restoration, Eureka, Lincoln County, Montana This EA will evaluate the potential...

305

EIS-0200: Notice of Intent to Prepare a Programmatic Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Intent to Prepare a Programmatic Environmental Impact Statement Proposed Integrated Environmental Restoration and Waste Management Program, and to Conduct Public...

306

FY 2013 Environmental Management Budget Request to Congress ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Skip to main content Energy.gov Office of Environmental Management Search form Search Office of Environmental Management Services Waste Management Site & Facility Restoration...

307

Office of Environmental Management: A Journey to Excellence ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Skip to main content Energy.gov Office of Environmental Management Search form Search Office of Environmental Management Services Waste Management Site & Facility Restoration...

308

FY 2011 Environmental Management Budget Request to Congress ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Skip to main content Energy.gov Office of Environmental Management Search form Search Office of Environmental Management Services Waste Management Site & Facility Restoration...

309

FY 2010 Environmental Management Budget Request to Congress ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Skip to main content Energy.gov Office of Environmental Management Search form Search Office of Environmental Management Services Waste Management Site & Facility Restoration...

310

FY 2012 Environmental Management Budget Request to Congress ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Skip to main content Energy.gov Office of Environmental Management Search form Search Office of Environmental Management Services Waste Management Site & Facility Restoration...

311

FY 2009 Environmental Management Budget Request to Congress ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Skip to main content Energy.gov Office of Environmental Management Search form Search Office of Environmental Management Services Waste Management Site & Facility Restoration...

312

EA-1974: Wallooskee-Youngs Confluence Restoration Project, Clatsop County,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Wallooskee-Youngs Confluence Restoration Project, Clatsop 4: Wallooskee-Youngs Confluence Restoration Project, Clatsop County, Oregon EA-1974: Wallooskee-Youngs Confluence Restoration Project, Clatsop County, Oregon Summary Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed restoration of a tidal marsh in the Columbia River Estuary, near Astoria in Clatsop County, Oregon. The project website is https://www.bpa.gov/goto/WallooskeeYoungs. Public Comment Opportunities Comments on the scope of the EA should be marked "Wallooskee-Youngs Confluence Restoration Project" and submitted by January 27, 2014, by one of the methods listed below. Comments will be posted in their entirety on BPA's website at www.bpa.gov/comments. Toll-free phone: 800-622-4519

313

Definition: Reduced Restoration Cost | Open Energy Information  

Open Energy Info (EERE)

Restoration Cost Jump to: navigation, search Dictionary.png Reduced Restoration Cost The functions that provide this benefit lead to fewer outages andor help restore power quicker...

314

Guidance Manual for Conducting Screening Level Ecological Risk Assessments at the INEL  

SciTech Connect

This document presents reference material for conducting screening level ecological risk assessments (SLERAs)for the waste area groups (WAGs) at the Idaho National Engineering Laboratory. Included in this document are discussions of the objectives of and processes for conducting SLERAs. The Environmental Protection Agency ecological risk assessment framework is closely followed. Guidance for site characterization, stressor characterization, ecological effects, pathways of contaminant migration, the conceptual site model, assessment endpoints, measurement endpoints, analysis guidance, and risk characterization are included.

R. L. VanHorn; N. L. Hampton; R. C. Morris

1995-06-01T23:59:59.000Z

315

Adaptive wiener image restoration kernel  

DOE Patents (OSTI)

A method and device for restoration of electro-optical image data using an adaptive Wiener filter begins with constructing imaging system Optical Transfer Function, and the Fourier Transformations of the noise and the image. A spatial representation of the imaged object is restored by spatial convolution of the image using a Wiener restoration kernel.

Yuan, Ding (Henderson, NV)

2007-06-05T23:59:59.000Z

316

Applied Environmental Microbiology | VIMSS - Virtual Institute...  

NLE Websites -- All DOE Office Websites (Extended Search)

the LLNL site restoration manager. The three Core Groups also have access to several Office of Environmental Management funded projects at metal and radionuclide contaminated...

317

M E Environmental Management Environmental Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

safety  performance  cleanup  closure safety  performance  cleanup  closure M E Environmental Management Environmental Management M E Environmental Management Environmental Management Office of Site Restoration, EM-10 Office of D&D and Facility Engineering, EM-13 Facility Deactivation & Decommissioning (D&D) D&D Program Map Addendum: Impact of American Recovery and Reinvestment Act (ARRA) on EM's D&D Program 2013 Edition U.S. Department Of Energy safety  performance  cleanup  closure M E Environmental Management Environmental Management safety  performance  cleanup  closure M E Environmental Management Environmental Management M E Environmental Management Environmental Management 3/13/2013 The American Recovery and Reinvestment Act of 2009

318

Water Resources Restoration and Preservation Act (Florida) |...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water Resources Restoration and Preservation Act (Florida) Water Resources Restoration and Preservation Act (Florida) Eligibility Agricultural Commercial Construction Developer...

319

Sandia National Laboratories: About Sandia: Environmental Responsibility  

NLE Websites -- All DOE Office Websites (Extended Search)

Responsibility Responsibility Environmental Management System Pollution Prevention About Environmental Responsibility Environmental responsibility workers at Sandia Long-term management aimed at preserving and enhancing the quality of the environment has evolved at Sandia National Laboratories for more than 50 years. Recycling, establishing community environmental partnerships, incorporating sustainable design in new and renovated facilities, and environmental restoration are all integral parts of Sandia's environmental stewardship. Sandia also partners with the Department of Energy to improve public participation in environmental issues, such as the implementation of the National Environmental Policy Act (NEPA) and Long-term Stewardship for environmental restoration. Participation in community organizations and

320

Decontamination and decommissioning plan for processing contaminated NaK at the INEL  

Science Conference Proceedings (OSTI)

This decontamination and decommissioning (D&D) plan describes the work elements and project management plan for processing four containers of contaminated sodium/potassium (NaK) and returning the Army Reentry Vehicle Facility Site (ARVFS) to a reusable condition. The document reflects the management plan for this project before finalizing the conceptual design and preliminary prototype tests of the reaction kinetics. As a result, the safety, environmental, and accident analyses are addressed as preliminary assessments before completion at a later date. ARVFS contains an earth-covered bunker, a cylindrical test pit and metal shed, and a cable trench connecting the two items. The bunker currently stores the four containers of NaK from the meltdown of the EBR-1 Mark II core. The D&D project addressed in this plan involves processing the contaminated NaK and returning the ARVFS to potential reuse after cleanup.

LaRue, D.M.; Dolenc, M.R.

1986-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "inel environmental restoration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Decontamination and decommissioning plan for processing contaminated NaK at the INEL  

Science Conference Proceedings (OSTI)

This decontamination and decommissioning (D D) plan describes the work elements and project management plan for processing four containers of contaminated sodium/potassium (NaK) and returning the Army Reentry Vehicle Facility Site (ARVFS) to a reusable condition. The document reflects the management plan for this project before finalizing the conceptual design and preliminary prototype tests of the reaction kinetics. As a result, the safety, environmental, and accident analyses are addressed as preliminary assessments before completion at a later date. ARVFS contains an earth-covered bunker, a cylindrical test pit and metal shed, and a cable trench connecting the two items. The bunker currently stores the four containers of NaK from the meltdown of the EBR-1 Mark II core. The D D project addressed in this plan involves processing the contaminated NaK and returning the ARVFS to potential reuse after cleanup.

LaRue, D.M.; Dolenc, M.R.

1986-09-01T23:59:59.000Z

322

EA-0941: Lower Yakima Valley Wetlands and Riparian Restoration Project,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41: Lower Yakima Valley Wetlands and Riparian Restoration 41: Lower Yakima Valley Wetlands and Riparian Restoration Project, Washington EA-0941: Lower Yakima Valley Wetlands and Riparian Restoration Project, Washington SUMMARY This EA evaluates the environmental impacts of the proposal for the U.S. Department of Energy's Bonneville Power Administration to fund that portion of the Washington Wildlife Mitigation Agreement pertaining to the Lower Yakima Valley Wetlands and Riparian Restoration Project (Project) in a cooperative effort with the Yakama Indian Nation and the Bureau of Indian Affairs. The proposed action would allow the sponsors to ensure property and conduct wildlife management activities for the Project within the boundaries of the Yakama Indian Reservation. PUBLIC COMMENT OPPORTUNITIES None available at this time.

323

prairie restoration plant ident  

NLE Websites -- All DOE Office Websites (Extended Search)

Plant Identification Plant Identification Once your restoration is started and plants begin to germinate, the next issue you are faced with is the identification of what is growing. From my experience, the seeds you planted should start germinating after about a week to ten days. Of course, this is dependent on the weather conditions and the amount of moisture in the soil. If you are watering regularly, you will get growth much more quickly than if you are just waiting for nature to take its course. Identifying prairie plants as they germinate is very difficult. If you are an experienced botanist or an expert on prairie plants, your identification will still be a little more than an educated guess. In other words identifying prairie species from non-native species will take some time.

324

Former Sites Restoration. Division  

Office of Legacy Management (LM)

@j&s* **$r* :. .+:., @j&s* **$r* :. .+:., II' .,.. I .&i. , :"': T.1 . i *&+t&&., @i i -:.+; L I. * . . .p.isit-!'..r'ir~i _, +.&.., . I. :?I,?.* .L,! j?' aa&* pi 4 L', ..b,- ., .e /w.1( ,v_.c ~A&$?>*:, ,..:.' .1 > . . . . . *. ,.. .I., .( j .~.~:,;;,.".,Certificafion ,Dockef for The ;,il' t:i~>$:+-.. ~~y:Remeciial Action. Performed "' . ::;:cxcgt the @+zb Gate Site in . ;' ! ,Oak Ridge, Tennessee, 7.99 7- 7 992 -.. Department .of Energy Former Sites Restoration. Division . ,Oak Ridge Operations .Office _. February 7 994 @ Printed on recycledhcy&ble paper. CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE ELZA GAP SITE IN OAK RIDGE, TENNESSEE, 1991-1992 FEBRUARY 1994 I Prepared for UNITED STATES DEPARTMENT OF ENERGY

325

DOE/EA-0845 Environmental Assessment Expansion  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

45 45 Environmental Assessment Expansion of the Idaho National Engineering Laboratory Research Center March 1994 U.S. Department of Energy MASTER DOE Idaho Operations Office Idaho Falls, Idaho _.OJ Oi_lll_lHl:lUTION OF TFII$O_r, UM_._T _ U_LJ_!_3'_ [6450-01] U.S. DEPARTMENT OF ENERGY FINDINGOF NO SIGNIFICANT IMPACT . FOR EXPANSION OF THE IDAHONATIONALENGINEERING LABORATORY RESEARCH CENTER AGENCY: Department of Energy ACTION: Findingof No Significant Impact(FONSI) SUMMARY: The Department of Energy(DOE)has prepared an environmental assessment (EA),DOE/EA-0845, for expansion and upgrade of facilities at the IdahoNationalEngineering Laboratory (INEL)Research Center(IRC)in Idaho Falls,Idaho. Construction and operation of proposed facilities wouldnot causesignificant environmental impacts. Basedon the analysesin the EA, DOE has determined that the proposedactionis

326

EA-1932: Bass Lake Native Fish Restoration, Eureka, Lincoln County, Montana  

Energy.gov (U.S. Department of Energy (DOE))

This EA was initiated to evaluate the potential environmental impacts of a BPA proposal to fund Montana Fish, Wildlife and Parks to help restore native fish populations to the Tobacco River and Lake Koocanusa. The project has been cancelled.

327

EA-1969: Clark Fork River Delta Restoration Project, Bonner County, Idaho  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration is preparing an environmental assessment to analyze the potential effects of a proposal to restore wetland and riparian (riverbank) habitat and to reduce erosion in the Clark Fork River delta located in Bonner County, Idaho.

328

Idaho National Engineering Laboratory Consolidated Transportation Facility. Environmental Assessment  

SciTech Connect

The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0822, addressing environmental impacts that could result from siting, construction, and operation of a consolidated transportation facility at the Idaho National Engineering Laboratory (INEL) near Idaho Falls, Idaho. The DOE proposes to construct and operate a new transportation facility at the Central Facilities Area (CFA) at the INEL. The proposed facility would replace outdated facilities and consolidate in one location operations that are conducted at six different locations at the CFA. The proposed facility would be used for vehicle and equipment maintenance and repair, administrative support, bus parking, and bus driver accommodation. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969, as amended. Therefore, the preparation of an environmental impact statement (EIS) is not required and the Department is issuing this finding of no significant impact.

1993-04-01T23:59:59.000Z

329

Environment/Health/Safety (EHS): Environmental Services Group (ESG)  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Services Group Environmental Services Group Whom To Call Operating Permits For LBNL Activities Publications Advisories Internal Documents Environmental Management System Environmental Restoration Program Weather Data Image of Chicken Creek The Environmental Services Group, within the Environment, Health and Safety Division, provides a comprehensive range of cost-effective environmental management services to Berkeley Lab by working with research and support staff. Services include: Your visit may be enhanced by upgrading or installing the latest Flash Player. ESG sampling activity Air and Water Quality Management Hazardous Materials Management Environmental Monitoring Radiological Dose and Environmental Risk Assessment Environmental Management System Environmental Restoration News & Updates

330

Metric Selection for Ecosystem Restoration  

E-Print Network (OSTI)

managers identify the best metrics to evaluate and select the recommended restoration plan, monitor and assess progress toward achieving project objectives, and, if necessary, inform adaptive management decisions. Performance metrics, or measurable system components used to estimate and track the state of critical aspects of the project, are often the basis for project decision making and furthering scientific understanding. As such, ecosystem restoration planners should take time to carefully select an appropriate and effective metric set. To help planners with this task, this technical note accomplishes the following: 1. Reviews current USACE ecosystem restoration planning and monitoring policy, regulations and guidelines. 2. Explains the importance of metric selection and its roles during planning and post-construction monitoring and assessment. 3. Reviews common options for identifying and selecting metrics including conceptual modeling, historical precedence, and best professional judgment. 4. Presents two metric evaluation methods, screening and multi-criteria decision analysis. 5. Discusses metric application to ecosystem restoration project planning and monitoring.

Matteo Convertino; Kelsie Baker; Connie Lu; John T. Vogel; Kyle Mckay; Igor Linkov

2013-01-01T23:59:59.000Z

331

Mixed and Low-Level Waste Treatment Facility project. Appendix A, Environmental and regulatory planning and documentation: Draft  

SciTech Connect

Mixed and low-level wastes generated at the Idaho National Engineering Laboratory (INEL) are required to be managed according to applicable State and Federal regulations, and Department of Energy Orders that provide for the protection of human health and the environment. The Mixed and Low-Level Waste Treatment Facility Project was chartered in 1991, by the Department of Energy to provide treatment capability for these mixed and low-level waste streams. The first project task consisted of conducting engineering studies to identify the waste streams, their potential treatment strategies, and the requirements that would be imposed on the waste streams and the facilities used to process them. This report, Appendix A, Environmental & Regulatory Planning & Documentation, identifies the regulatory requirements that would be imposed on the operation or construction of a facility designed to process the INEL`s waste streams. These requirements are contained in five reports that discuss the following topics: (1) an environmental compliance plan and schedule, (2) National Environmental Policy Act requirements, (3) preliminary siting requirements, (4) regulatory justification for the project, and (5) health and safety criteria.

1992-04-01T23:59:59.000Z

332

United States Department of Energy Chicago Field Office Environmental  

NLE Websites -- All DOE Office Websites (Extended Search)

ASME American Society of Mechanical Engineers D&D Decontamination and Decommissioning DOE U.S. Department of Energy EM Environmental Restoration and Waste Management FY fiscal...

333

Chesapeake Bay Restoration Act (Maryland) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Restoration Act (Maryland) Restoration Act (Maryland) Chesapeake Bay Restoration Act (Maryland) < Back Eligibility Agricultural Commercial Construction Developer Industrial Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Maryland Program Type Environmental Regulations Provider Maryland Department of the Environment This legislation sets limits on development near Chesapeake Bay as well as on dredging and the deposition of dredged material into the bay. The legislation establishes the Cox Creek Citizens Oversight Committee (now mostly defunct); the Hart-Miller-Pleasure Island Oversight Committee, which provides oversight and monitoring of the future development, use, and

334

Report of results of the vapor vacuum extraction test at the Radioactive Waste Management Complex (RWMC) on the Idaho National Engineering Laboratory (INEL) in the state of Idaho  

SciTech Connect

A test-scale vapor vacuum extraction (VVE) system was installed and operated at the Radioactive Waste Management Complex (RWMC) on the Idaho National Engineering Laboratory (INEL), which is west of Idaho Falls, Idaho and is managed by the US Department of Energy Idaho Field Office. The system was constructed for the purpose of demonstrating the feasibility of VVE or vapor venting technology to abate a volatile organic compound (VOC) plume located in the vadose zone below the subsurface disposal area at the complex. To date, the system has been operated for two periods, a two-week test and a four-month test. The purpose of the two-week test was to determine what would be extracted from the borehole and to verify the design of the system to handle what would be extracted.

Chatwin, T.D.; Miyasaki, D.H.; Sisson, J.B.; Sondrup, A.J.

1992-08-01T23:59:59.000Z

335

Report of results of the vapor vacuum extraction test at the Radioactive Waste Management Complex (RWMC) on the Idaho National Engineering Laboratory (INEL) in the state of Idaho  

SciTech Connect

A test-scale vapor vacuum extraction (VVE) system was installed and operated at the Radioactive Waste Management Complex (RWMC) on the Idaho National Engineering Laboratory (INEL), which is west of Idaho Falls, Idaho and is managed by the US Department of Energy Idaho Field Office. The system was constructed for the purpose of demonstrating the feasibility of VVE or vapor venting technology to abate a volatile organic compound (VOC) plume located in the vadose zone below the subsurface disposal area at the complex. To date, the system has been operated for two periods, a two-week test and a four-month test. The purpose of the two-week test was to determine what would be extracted from the borehole and to verify the design of the system to handle what would be extracted.

Chatwin, T.D.; Miyasaki, D.H.; Sisson, J.B.; Sondrup, A.J.

1992-01-01T23:59:59.000Z

336

Remedial investigation work plan for Bear Creek Valley Operable Unit 2 (Rust Spoil Area, SY-200 Yard, Spoil Area 1) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program  

Science Conference Proceedings (OSTI)

The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste facilities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RFA)/RCRA Facility Investigation (RFI)/Corrective Measures Study (CMS)/Corrective Measures implementation process. Under CERCLA the actions follow the PA/SI/Remedial Investigation (RI)/Feasibility Study (FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCLA into an RI work plan for the characterization of Bear Creek Valley (BCV) Operable Unit (OU) 2.

Not Available

1993-05-01T23:59:59.000Z

337

National Environmental Policy Act Environmental Checklist  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31-10 31-10 u.s. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist Project/Activity: Restoration of drill pads, infiltration basins, sumps, and other surface areas at the Central Nevada Test Area, Nevada A. Brief Project/Activity Description The U.S. Department of Energy (DOE) Office of Legacy Management (LM) proposes to restore two drill pads with infiltration basins, two lined sumps, and miscellaneous surface areas associated with groundwater monitoring wells. A small crew of four people would take 2 weeks to complete this work in early September 2010. Disturbed areas would be hand-seeded with native plant species in November 2010. An attached figure shows all affected areas. Drill pads associated with groundwater monitoring wells MV-4 and MV-5 are each approximately 250 feet (ft)

338

4. ENVIRONMENTAL IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4. ENVIRONMENTAL IMPACTS OF THE PROPOSED ACTION AND 4. ENVIRONMENTAL IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES . This section describes potential environmental impacts of the proposed action and alternatives. If the proposed action is implemented, activities would be limited to existing facilities. A WERF modification would be required to allow for injection of an atomized aqueous waste stream into the incinerator lower chamber. The installation would be performed within the WERF incinerator/stabilization building and may use an existing incinerator access port. Installation work would be similar to many routine maintenance and modification actions at WERF. A detailed analysis of potential impacts from processing INEL-generated LL W at commercial facilities is not presented in this EA because specific commercial facilities and processes have not

339

Supplemental investigations in support of environmental assessments by the Idaho INEL Oversight Program at the Idaho National Engineering Laboratory. Second year progress report  

SciTech Connect

this report discusses the second and third year`s progress for the project. Included is information on the hydrologic studies in wells, unsaturated zone contamination and transport processes, surface water - groundwater interactions and regional groundwater flow, and air quality testing.

Hill, S.R.

1992-12-01T23:59:59.000Z

340

Weather, Climate, and Environmental Water Transactions  

Science Conference Proceedings (OSTI)

Obtaining water for environmental purposes, such as habitat restoration or water quality improvements, has become an important objective in many parts of the world. Such water acquisitions are likely to become more challenging as regional water ...

Lana Jones; Bonnie Colby

2010-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "inel environmental restoration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Louisiana Coastal Area, Louisiana Ecosystem Restoration  

E-Print Network (OSTI)

1 Louisiana Coastal Area, Louisiana Ecosystem Restoration Six Projects Authorized by Section 7006(e for the Louisiana Coastal Area, dated January 31, 2005, (hereinafter referred to as the "restoration plan"), described a program to address the most critical restoration needs to reduce the severe wetland losses

US Army Corps of Engineers

342

Idaho National Engineering Laboratory Waste Management Operations Roadmap Document  

SciTech Connect

At the direction of the Department of Energy-Headquarters (DOE-HQ), the DOE Idaho Field Office (DOE-ID) is developing roadmaps for Environmental Restoration and Waste Management (ER&WM) activities at Idaho National Engineering Laboratory (INEL). DOE-ID has convened a select group of contractor personnel from EG&G Idaho, Inc. to assist DOE-ID personnel with the roadmapping project. This document is a report on the initial stages of the first phase of the INEL`s roadmapping efforts.

Bullock, M.

1992-04-01T23:59:59.000Z

343

EA-1736: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

36: Final Environmental Assessment 36: Final Environmental Assessment EA-1736: Final Environmental Assessment Expansion of the Sanitary Effluent Reclamation Facility and Environmental Restoration of Reach S-2 of Sandia Canyon at Los Alamos National Laboratory, Los Alamos, New Mexico This Environmental Assessment (EA) considers two separate actions, the expansion of the Sanitary Effluent Reclamation Facility (SERF) and environmental restoration activities located within a portion of upper Sandia Canyon, designated as reach S-2. Both of these actions would take place adjacent to or within upper Sandia Canyon at Los Alamos National Laboratory (LANL). DOE/EA-1736, National Nuclear Security Administration, Final Environmental Assessment for the Expansion of the Sanitary Effluent Reclamation Facility

344

Development of Power System Restoration Tool Based on Generic Restoration Milestones  

Science Conference Proceedings (OSTI)

The importance of power system restoration is well recognized by the power industry. System reliability depends heavily on the efficiency of system restoration. EPRI has been working on developing a prototype decision support tool, the System Restoration Navigator (SRN), for evaluating system restoration strategies, based on the concept of Generic Restoration Milestones (GRMs). This tool is intended to be used for offline planning at the current stage and later on for dispatcher training and online decis...

2010-12-22T23:59:59.000Z

345

Office of Environmental Management | Department of Energy  

NLE Websites -- All DOE Office Websites

Environmental Management Environmental Management Search Search form Search Office of Environmental Management Office of Environmental Management Services Services Home Waste Management Waste Management Home Nuclear Materials & Waste Tank Waste and Waste Processing Waste Disposition Packaging and Transportation Site & Facility Restoration Site & Facility Restoration Home Deactivation & Decommissioning (D&D) Facility Engineering Soil & Groundwater Sustainability Program Management Program Management Home Safety Security Quality Assurance Budget & Performance Acquisition Compliance Project Management Communication & Engagement Communication & Engagement Home Intergovernmental Programs EMAB EM SSAB Tribal Programs International Programs Long-Term Stewardship Community Involvement Fund

346

2009 Site Environmental Report  

SciTech Connect

Each year, Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1A, Environment, Safety and Health Reporting of the U.S. Department of Energy. The report is written to inform the public, regulators, employees, and other stakeholders of BNL's environmental performance during the calendar year in review. The SER summarizes environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and compliance, restoration, and surveillance monitoring program performance. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. The report is available in print and as a downloadable file on the BNL web page at http://www.bnl.gov/ewms/ser/. A summary of the SER is also prepared each year to provide a general overview of the report, and is distributed with a CD of the full report.

Ratel, K.M.; Brookhaven National Laboratory

2010-09-30T23:59:59.000Z

347

2005 SITE ENVIRONMENTAL REPORT  

Science Conference Proceedings (OSTI)

Each year, Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1A, Environment, Safety and Health Reporting of the U.S. Department of Energy (DOE). The report is written to inform the public, regulators, employees, and other stakeholders of BNL's environmental performance during the calendar year in review. The SER summarizes environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and compliance, restoration, and surveillance monitoring program performance. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. The report is available in print and as a downloadable file on the BNL web page at http://www.bnl.gov/ewms/ser/. A summary of the SER is also prepared each year to provide a general overview of the report, and is distributed with a CD of the full report.

BROOKHAVEN NATIONAL LABORATORY

2006-08-29T23:59:59.000Z

348

2006 SITE ENVIRONMENTAL REPORT  

Science Conference Proceedings (OSTI)

Each year, Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1A, Environment, Safety and Health Reporting of the U.S. Department of Energy. The report is written to inform the public, regulators, employees, and other stakeholders of BNL's environmental performance during the calendar year in review. The SER summarizes environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and compliance, restoration, and surveillance monitoring program performance. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. The report is available in print and as a downloadable file on the BNL web page at http://www.bnl.gov/ewms/ser/. A summary of the SER is also prepared each year to provide a general overview of the report, and is distributed with a CD of the full report.

BROOKHAVEN NATIONAL LABORATORY; RATEL,K.

2007-10-01T23:59:59.000Z

349

Hanford Site environmental report for calendar year 1989  

Science Conference Proceedings (OSTI)

This report is a summary of the environmental status of the Hanford Site in 1989. It includes descriptions of the Site and its mission, the status of compliance with environmental regulations, planning and activities to accomplish compliance, environmental protection and restoration activities, and environmental monitoring. 97 refs., 67 figs., 14 tabs.

Jaquish, R.E.; Bryce, R.W. (eds.)

1990-05-01T23:59:59.000Z

350

Oak Ridge Reservation Annual Site environmental report summary for 1994  

SciTech Connect

This document presents a summary of the information collected for the Oak Ridge Reservation 1994 site environmental report. Topics discussed include: Oak Ridge Reservation mission; ecology; environmental laws; community participation; environmental restoration; waste management; radiation effects; chemical effects; risk to public; environmental monitoring; and radionuclide migration.

1995-09-01T23:59:59.000Z

351

High Flux Beam Reactor | Environmental Restoration Projects | BNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Complex Description Complex Description Current HFBR Complex The HFBR complex consists of multiple structures and systems that were necessary to operate and maintain the reactor. The most recognizable features of the complex are the domed reactor confinement building and the distinctive red-and-white stack. Portions of the complex building structures, systems, and components, some of which are underground, were contaminated with radionuclides and chemicals as a result of previous HFBR and Brookhaven Graphite Research Reactor (BGRR) operations. A number of decommissioning and preparation for long-term safe storage actions have been taken including the removal of contaminated structures, hazardous materials, and contaminated equipment and components. The structures and systems, both current and former, are

352

High Flux Beam Reactor | Environmental Restoration Projects | BNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Why is the High Flux Beam Reactor Being Decommissioned? Why is the High Flux Beam Reactor Being Decommissioned? HFBR The High Flux Beam Reactor (HFBR) at Brookhaven National Laboratory (BNL) is being decommissioned because the Department of Energy (DOE) decided in 1999 that it would be permanently closed. The reactor was shut down in 1997 after tritium from a leak in the spent-fuel pool was found in the groundwater. The HFBR, which had operated from 1965 to 1996, was used solely for scientific research, providing neutrons for materials science, chemistry, biology, and physics experiments. The reactor was shut down for routine maintenance in November of 1996. In January 1997, tritium, a radioactive form of hydrogen and a by-product of reactor operations, was found in groundwater monitoring wells immediately south of the HFBR. The tritium

353

MICROBIAL TRANSFORMATIONS OF URANIUM AND ENVIRONMENTAL RESTORATION THROUGH BIOREMEDIATION.  

SciTech Connect

Microorganisms present in the natural environment play a significant role in the mobilization and immobilization of uranium. Fundamental understanding of the mechanisms of microbiological transformations of various chemical forms of uranium present in wastes and contaminated soils and water has led to the development of novel bioremediation processes. One process uses anaerobic bacteria to stabilize the radionuclides and toxic metals from the waste, with a concurrent reduction in volume due to the dissolution and removal of nontoxic elements from the waste matrix. In an another process, uranium and other toxic metals are removed from contaminated soils and wastes by extracting with the chelating agent citric acid. Uranium is recovered from the citric acid extract after biodegradation/photodegradation in a concentrated form as UO{sub 3} {center_dot} 2H{sub 2}O for recycling or appropriate disposal.

FRANCIS,A.J.

2002-09-10T23:59:59.000Z

354

Audit of Environmental Restoration at the Los Alamos National...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ombudsman FOIA Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work...

355

S M Stoller Pinellas Environmental Restoration Project - 4.5...  

Office of Legacy Management (LM)

ND 4.8 0.96 ugl 218-01-9 Chrysene ND 4.8 0.96 ugl 111-91-1 bis(2-Chloroethoxy)methane ND 4.8 0.96 ugl 111-44-4 bis(2-Chloroethyl)ether ND 4.8 1.9 ugl ND Not detected...

356

Nevada Environmental Restoration Project DOE/NV-368 Project Chariot...  

Office of Legacy Management (LM)

of cosmic rays to the background radiation field iraries with altitude and geomagnetic latitude. The earth's magnetic field traps some of the cosmic rays, I so a larger...

357

Master EM Project Definition Rating Index - Environmental Restoration...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to an independent review by an organization not directly involved with the project (ICE, EIR, IPR, as required). The independent review has been documented, including the...

358

Tonopah Test Range Environmental Restoration Corrective Action Sites  

SciTech Connect

This report describes the status (closed, closed in place, or closure in progress) of the Corrective Action Sites and Corrective Action Units at the Tonopah Test Range

NSTec Environmental Restoration

2010-08-04T23:59:59.000Z

359

MICROBIAL TRANSFORMATIONS OF RADIONUCLIDES AND ENVIRONMENTAL RESTORATION THROUGH BIOREMEDIATION.  

Science Conference Proceedings (OSTI)

Treatment of waste streams containing radionuclides, the remediation of contaminated materials, soils, and water, and the safe and economical disposal of radionuclides and toxic metals containing wastes is a major concern. Radionuclides may exist in various oxidation states and may be present as oxide, coprecipitates, inorganic, and organic complexes depending on the process and waste stream. Unlike organic contaminants, the metals cannot be destroyed, but must either be converted to a stable form or removed. Microorganisms present in the natural environment play a major role in the mobilization and immobilization of radionuclides and toxic metals by direct enzymatic or indirect non-enzymatic actions and could affect the chemical nature of the radionuclides by altering the speciation, solubility and sorption properties and thus could increase or decrease the concentrations of radionuclides in solution. Fundamental understanding of the mechanisms of microbiological transformations of various chemical forms of uranium present in wastes and contaminated soils and water has led to the development of novel bioremediation processes. One process uses anaerobic bacteria to stabilize the radionuclides by reductive precipitation from higher to lower oxidation state with a concurrent reduction in volume due to the dissolution and removal of nontoxic elements from the waste matrix. In an another process, uranium and other toxic metals are removed from contaminated surfaces, soils, and wastes by extracting with the chelating agent citric acid. Uranium is recovered from the citric acid extract after biodegradation followed by photodegradation in a concentrated form as UO{sub 3} {center_dot} 2H{sub 2}O for recycling or appropriate disposal. These processes use all naturally occurring materials, common soil bacteria, naturally occurring organic compound citric acid and sunlight.

FRANCIS, A.J.

2006-09-29T23:59:59.000Z

360

Environmental Impact Statements and Environmental Assessments Status Chart  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 23, 2009 September 23, 2009 EIS-0407: DOE Notice of Availability of the Draft Environmental Impact Statement Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas September 21, 2009 EIS-0435: Notice of Intent to Prepare an Environmental Impact Statement and Conduct a Scoping Meeting Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota September 15, 2009 EIS-0434: Notice of Intent To Prepare an Environmental Impact Statement and to Conduct Scoping Meetings Hualapai Valley Solar Interconnection Project in Mohave County, Arizona July 30, 2009 EIS-0425: Notice of Intent to Prepare an Environmental Impact Statement Bonneville Power Administration Mid-Columbia Coho Restoration Project, Chelan and Okanogan Counties, WA

Note: This page contains sample records for the topic "inel environmental restoration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Environmental Site Characterization and Remediation at Former Grain Storage  

NLE Websites -- All DOE Office Websites (Extended Search)

Applied Geosciences and Environmental Management (AGEM) Program Applied Geosciences and Environmental Management (AGEM) Program The EVS Applied Geosciences and Environmental Management (AGEM) program improves methods for characterizing and restoring environmental sites contaminated with carbon tetrachloride. For decades, the EVS Applied Geosciences and Environmental Management program has been improving methods for characterizing and restoring environmental sites contaminated with carbon tetrachloride. A key to our streamlined site characterization process is extensive use of cone penetrometer technology, with customized sampling and drilling tools, to minimize intrusiveness and the amount of hazardous waste generated. We have also improved analytical methods so that we can rapidly detect lower concentrations of contaminants and have developed methods for integrating

362

EIS-0425: Mid-Columbia Coho Restoration, Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25: Mid-Columbia Coho Restoration, Washington 25: Mid-Columbia Coho Restoration, Washington EIS-0425: Mid-Columbia Coho Restoration, Washington Summary This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to fund the construction, operation, and maintenance of a coho salmon restoration program sponsored by the Confederated Tribes and Bands of the Yakama Nation to help mitigate impacts to fish affected by the Federal Columbia River Power System dams on the Columbia River. The Proposed Action would involve building a new, small, in-basin adult holding/spawning, incubation and rearing facility on the Wenatchee River at one of two potential sites; and constructing and improving several sites in both the Wenatchee and Methow river basins in north central Washington State.

363

EIS-0425: Mid-Columbia Coho Restoration, Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0425: Mid-Columbia Coho Restoration, Washington EIS-0425: Mid-Columbia Coho Restoration, Washington EIS-0425: Mid-Columbia Coho Restoration, Washington Summary This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to fund the construction, operation, and maintenance of a coho salmon restoration program sponsored by the Confederated Tribes and Bands of the Yakama Nation to help mitigate impacts to fish affected by the Federal Columbia River Power System dams on the Columbia River. The Proposed Action would involve building a new, small, in-basin adult holding/spawning, incubation and rearing facility on the Wenatchee River at one of two potential sites; and constructing and improving several sites in both the Wenatchee and Methow river basins in north central Washington State.

364

Environmental report 1993  

Science Conference Proceedings (OSTI)

Lawrence Livermore National Laboratory (LLNL), a US Department of Energy (DOE) facility operated by the University of California, serves as a national resource of scientific, technical, and engineering capability with a special focus on national security. Over the years, the Laboratory`s mission has been broadened to encompass such areas as strategic defense, energy, the environment, biomedicine, the economy, and education. The Laboratory carries out this mission in compliance with local, state, and federal environmental regulatory requirements and takes measures to ensure that its operations do not adversely affect the environment or public health. It does so with the support of the Environmental Protection Department, which is responsible for environmental monitoring, environmental restoration, hazardous waste management, and ensuring environmental compliance. During 1993, the Environmental Protection Department conducted sampling of air, sewage effluent, ground water, surface water, soil, vegetation and foodstuffs, and took measurements of environmental radiation. It performed more than 190,000 analyses of environmental samples. The analytical results are summarized along with evaluations of the impact of radioactive and nonradioactive materials, a discussion of the effects of LLNL operations on the environment, and a summary of the activities undertaken to comply with local, state, and federal environmental laws.

Wilt, G.C. [ed.; Gallegos, G.M.; Tate, P.J.; Balke, B.K. [and others

1994-09-01T23:59:59.000Z

365

2002 SITE ENVIRONMENTAL REPORT.  

Science Conference Proceedings (OSTI)

The 2002 Site Environmental Report (SER) is prepared in accordance with DOE Order 231.1, ''Environment, Safety and Health Reporting'', and summarizes the status of Brookhaven National Laboratory's (BNL) environmental programs and performance and restoration efforts, as well as any impacts, both past and present, that Laboratory operations have had on the environment. The document is intended to be technical in nature. A summary of the report is also prepared as a separate document to provide a general overview and includes a CD version of the full report. Operated by Brookhaven Science Associates (BSA) for the Department of Energy (DOE), BNL manages its world-class scientific research with particular sensitivity to environmental and community issues. BNL's motto, ''Exploring Life's Mysteries...Protecting its Future'', reflects BNL's management philosophy to fully integrate environmental stewardship into all facets of its missions, with a health balance between science and the environment.

BROOKHAVEN NATIONAL LABORATORY

2003-10-01T23:59:59.000Z

366

Protocols for Monitoring Habitat Restoration Projects in the Lower Columbia River and Estuary  

SciTech Connect

Protocols for monitoring salmon habitat restoration projects are essential for the U.S. Army Corps of Engineers' environmental efforts in the Columbia River estuary. This manual provides state-of-the science data collection and analysis methods for landscape features, water quality, and fish species composition, among others.

Roegner, G. Curtis; Diefenderfer, Heida L.; Borde, Amy B.; Thom, Ronald M.; Dawley, Earl M.; Whiting, Allan H.; Zimmerman, Shon A.; Johnson, Gary E.

2008-04-25T23:59:59.000Z

367

Independent component analysis for document restoration  

Science Conference Proceedings (OSTI)

We propose a novel approach to restoring digital document images, with the aim of improving text legibility and OCR performance. These are often compromised by the presence of artifacts in the background, derived from many kinds of degradations, such ... Keywords: Blind source separation, Degraded documents, Independent component analysis, Palimpsest restoration- Bleed-through cancellation

Anna Tonazzini; Luigi Bedini; Emanuele Salerno

2004-03-01T23:59:59.000Z

368

Annual report -- 1992: Environmental surveillance for EG & G Idaho Waste Management Facilities at the Idaho National Engineering Laboratory  

SciTech Connect

This report describes the 1992 environmental surveillance activities of the Environmental Monitoring Unit of EG&G Idaho, Inc., at EG&G Idaho-operated Waste Management facilities at the Idaho National Engineering Laboratory (INEL). The major facilities monitored include the Radioactive Waste Management Complex, the Waste Experimental Reduction Facility, the Mixed Waste Storage Facility, and two surplus facilities. Included are some results of the sampling performed by the Radiological and Environmental Sciences Laboratory and the United States Geological Survey. The primary purposes of monitoring are to evaluate environmental conditions, to provide and interpret data, to ensure compliance with applicable regulations or standards, and to ensure protection of human health and the environment. This report compares 1992 environmental surveillance data with DOE derived concentration guides, and with data from previous years.

Wilhelmsen, R.N.; Wright, K.C.; McBride, D.W.

1993-08-01T23:59:59.000Z

369

Hurricane Response and Restoration | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hurricane Response and Restoration Hurricane Response and Restoration Hurricane Response and Restoration June 1, 2011 - 5:15pm Addthis Despite all of ISER's efforts to promote reliability and resiliency in the energy sector, domestic and global events will occur that will disrupt the sector and ISER must always be prepared to respond. In the face of both manmade and natural disasters, ISER applies cutting edge technical solutions and emergency management expertise to help overcome challenges inherent in quickly restoring an incredibly complex U.S. energy system. ISER plans, trains, and coordinates year round with all relevant stakeholders so that it can meet our nation's energy needs by deploying energy emergency responders to coordinate and facilitate system restoration activities with local, state, territorial, Federal, public and private

370

Response and Restoration | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Restoration Restoration Response and Restoration Despite all of ISER's efforts to promote reliability and resiliency in the energy sector, domestic and global events will occur that will disrupt the sector and ISER must always be prepared to respond. In the face of both manmade and natural disasters, ISER applies cutting edge technical solutions and emergency management expertise to help overcome challenges inherent in quickly restoring an incredibly complex U.S. energy system. ISER plans, trains, and coordinates year round with all relevant stakeholders so that it can meet our nation's energy needs by deploying energy emergency responders to coordinate and facilitate system restoration activities with local, state, territorial, Federal, public and private sector stakeholders, in some cases, coordinating the utilization of certain

371

Restoration Tax Abatement (Louisiana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Restoration Tax Abatement (Louisiana) Restoration Tax Abatement (Louisiana) Restoration Tax Abatement (Louisiana) < Back Eligibility Commercial Low-Income Residential Multi-Family Residential Residential Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Solar Buying & Making Electricity Wind Program Info State Louisiana Program Type Property Tax Incentive Provider Louisiana Economic Development Restoration Tax Abatement (RTA) Program provides five-year property tax abatement for the expansion, restoration, improvement, and development of existing commercial structures and owner-occupied residences. The program grants a five-year deferred assessment of the ad valorem property taxes on renovations and improvements. Equipment that becomes an integral part of the structure can qualify for this exemption. The structure must be located

372

Environmental Report 2008  

Science Conference Proceedings (OSTI)

The purposes of the Lawrence Livermore National Laboratory Environmental Report 2008 are to record Lawrence Livermore National Laboratory's (LLNL's) compliance with environmental standards and requirements, describe LLNL's environmental protection and remediation programs, and present the results of environmental monitoring at the two LLNL sites - the Livermore site and Site 300. The report is prepared for the U.S. Department of Energy (DOE) by LLNL's Environmental Protection Department. Submittal of the report satisfies requirements under DOE Order 231.1A, Environmental Safety and Health Reporting, and DOE Order 5400.5, Radiation Protection of the Public and Environment. The report is distributed electronically and is available at https://saer.lln.gov/, the website for the LLNL annual environmental report. Previous LLNL annual environmental reports beginning in 1994 are also on the website. Some references in the electronic report text are underlined, which indicates that they are clickable links. Clicking on one of these links will open the related document, data workbook, or website that it refers to. The report begins with an executive summary, which provides the purpose of the report and an overview of LLNL's compliance and monitoring results. The first three chapters provide background information: Chapter 1 is an overview of the location, meteorology, and hydrogeology of the two LLNL sites; Chapter 2 is a summary of LLNL's compliance with environmental regulations; and Chapter 3 is a description of LLNL's environmental programs with an emphasis on the Environmental Management System including pollution prevention. The majority of the report covers LLNL's environmental monitoring programs and monitoring data for 2008: effluent and ambient air (Chapter 4); waters, including wastewater, storm water runoff, surface water, rain, and groundwater (Chapter 5); and terrestrial, including soil, sediment, vegetation, foodstuff, ambient radiation, and special status wildlife and plants (Chapter 6). Complete monitoring data, which are summarized in the body of the report, are provided in Appendix A. The remaining three chapters discuss the radiological impact on the public from LLNL operations (Chapter 7), LLNL's groundwater remediation program (Chapter 8), and quality assurance for the environmental monitoring programs (Chapter 9). The report uses Systeme International units, consistent with the federal Metric Conversion Act of 1975 and Executive Order 12770, Metric Usage in Federal Government Programs (1991). For ease of comparison to environmental reports issued prior to 1991, dose values and many radiological measurements are given in both metric and U.S. customary units. A conversion table is provided in the glossary. The report is the responsibility of LLNL's Environmental Protection Department. Monitoring data were obtained through the combined efforts of the Environmental Protection Department; Environmental Restoration Department; Physical and Life Sciences Environmental Monitoring Radiation Laboratory; and the Hazards Control Department.

Gallegos, G; Bertoldo, N A; Campbell, C G; Cerruti, S; Dibley, V; Doman, J L; Grayson, A R; Jones, H E; Kumamoto, G; MacQueen, D H; Nelson, J C; Paterson, L; Revelli, M A; Wegrecki, A M; Wilson, K; Woollett, J

2009-09-16T23:59:59.000Z

373

2003 SITE ENVIRONMENTAL REPORT  

SciTech Connect

Each year, Brookhaven National Laboratory (BNL), a multi-program national laboratory, prepares an annual Site Environmental Report (SER) in accordance with Order 231.1A, Environment, Safety and Health Reporting, of the U.S. Department of Energy (DOE). The SER is written to inform outside regulators, the public, and Laboratory employees of BNL's environmental performance during the calendar year in review, and to summarize BNL's on-site environmental data; environmental management performance; compliance with applicable DOE, Environmental Protection Agency (EPA), state, and local regulations; and environmental, restoration, and surveillance monitoring programs. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. This report is intended to be a technical document. It is available in print and as a downloadable file on the BNL web page at http://www.bnl.ser.htm. A summary of the SER is also prepared each year to provide a general overview, and is distributed with a CD version of the full-length SER. The summary supports BNL's educational and community outreach program.

ENVIRONMENT AND WASTE MANAGMENT SERVICES DIVISION; ET AL.

2004-10-01T23:59:59.000Z

374

Environmental Management System  

NLE Websites -- All DOE Office Websites (Extended Search)

Video Community, Environment Environmental Stewardship Environmental Protection Environmental Management System Environmental Management System An Environmental...

375

EA-1969: Clark Fork River Delta Restoration Project, Bonner County...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1969: Clark Fork River Delta Restoration Project, Bonner County, Idaho EA-1969: Clark Fork River Delta Restoration Project, Bonner County, Idaho Summary Bonneville Power...

376

Wild Life Restoration in the Forest Preserves  

NLE Websites -- All DOE Office Websites (Extended Search)

Life Restoration in the Forest Preserves Life Restoration in the Forest Preserves Nature Bulletin No. 613 October 15, 1960 Forest Preserve District of Cook County Daniel Ryan, President Roberts Mann, Conservation Editor David H. Thompson, Senior Naturalist WILD LIFE RESTORATION IN THE FOREST PRESERVES The wealth of wildlife in the Cook County forest preserves rivals that in any of the other 101 Illinois counties, in spite of the fact that over half of the state's people are crowded within its boundaries. The large variety of birds, mammals and other animal life now in this county is possible largely because the Forest Preserve District protects their natural habitats, including many that have been restored. These include timbered rolling uplands, wooded stream valleys, prairie remnants, sand flats, marshes, and a hundred bodies of water. Protection, for as much as forty years, against fire, hunting, trapping and other destruction has allowed the natural comeback of these habitats and the build-up of wildlife populations.

377

Environmental Survey preliminary report, Oak Ridge Gaseous Diffusion Plant, Oak Ridge, Tennessee  

SciTech Connect

This report presents the preliminary findings from the first phase of the Environmental Survey of the US Department of Energy's (DOE) Oak Ridge Gaseous Diffusion Plant (ORGDP) conducted March 14 through 25, 1988. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental risk associated with ORGDP. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at ORGDP, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during is on-site activities. The Sampling and Analysis Plan will be executed by Idaho National Engineering Laboratory (INEL). When completed, the results will be incorporated into the ORGDP Survey findings for in inclusion into the Environmental Survey Summary Report. 120 refs., 41 figs., 74 tabs.

Not Available

1989-02-01T23:59:59.000Z

378

EIS-0346: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: EPA Notice of Availability of the Draft Environmental 6: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0346: EPA Notice of Availability of the Draft Environmental Impact Statement Salmon Creek Project, Water Flow Restoration and Streambed Rehabilitation, Providing Passage for Summer Steelhead and Spring Chinook, Funding, Okanogan County, Washington Salmon Creek Project, Water Flow Restoration and Streambed Rehabilitation, Providing Passage for Summer Steelhead and Spring Chinook, Funding, Okanogan County, Washington DOE/EIS-0346, Notice of Availability of Draft EIS, Environmental Protection Agency, Salmon Creek Project, Water Flow Restoration and Streambed Rehabilitation, Providing Passage for Summer Steelhead and Spring Chinook, Funding, Okanogan County, Washington, 69 FR 53916 (September 2004)

379

Environmental Management Assessment of the Fernald Environmental Management Project (FEMP)  

Science Conference Proceedings (OSTI)

This report documents the results of the Environmental Management Assessment performed at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. During this assessment, the activities conducted by the assessment team included review of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and FEMP contractor personnel; and inspection and observation of selected facilities and operations. The onsite portion of the assessment was conducted from March 15 through April 1, 1993, by DOE`s Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). EH-24 carries out independent assessments of DOE facilities and activities as part of the EH-1 Environment, Safety, and Health (ES&H) Oversight Audit Program. The EH-24 program is designed to evaluate the status of DOE facilities and activities with respect to compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, Guidance and Directives; conformance with accepted industry practices and standards of performance; and the status and adequacy of management systems developed to address environmental requirements. The Environmental Management Assessment of FEMP focused on the adequacy of environmental management systems. Further, in response to requests by the Office of Environmental Restoration and Waste Management (EM) and Fernald Field Office (FN), Quality Assurance and Environmental Radiation activities at FEMP were evaluated from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section in this report.

Not Available

1993-04-01T23:59:59.000Z

380

Environmental data management at Fernald  

SciTech Connect

FERMCO supports DOE`s ongoing initiatives for the continuous improvement of site restoration through the development and application of innovative technologies. A major thrust of FERMCO`s efforts has been the enhancement of environmental data management technology for the site. The understanding of environmental data is the fundamental basis for determining the need for environmental restoration, developing and comparing remedial alternatives, and reaching a decision on how to clean up a site. Environmental data management at Fernald is being focused on two major objectives: to improve the efficiency of the data management process, and to provide a better understanding of the meaning of the data at the earliest possible time. Environmental data at Fernald is typically a soil or groundwater sample collected by one of the field geologists. These samples are then shipped to one or more laboratories for analysis. After the analyses are returned from the laboratories the data are reviewed and qualified for usability. The data are then used by environmental professionals for determining nature and extent of contamination. Additionally, hazardous waste materials whether generated during production or during cleanup, may be sampled to characterize the waste before shipment or treatment. The data management process, which uses four major software systems, is presented graphically.

Jones, B.W.; Williams, J.

1994-04-22T23:59:59.000Z

Note: This page contains sample records for the topic "inel environmental restoration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

A survey of environmental needs and innovative technologies in Germany  

SciTech Connect

The International Technology Program (IT?), formerly the international Technology Exchange Program (ITEP), of the Department of Energy`s (DOE`s) Office of Environmental Restoration and Waste Management (EM) is responsible for promoting: (1) the import of innovative technologies to better address EM`s needs; and (2) the export of US services into foreign markets to enhance US competitiveness. Under this program: (1) the environmental restoration market in Germany was evaluated, including the description of the general types of environmental problems, the environmental regulations, and specific selected contaminated sites; and (2) potentially innovative environmental restoration technologies, either commercially available or under development in Germany, were identified, described and evaluated. It was found that: (1) the environmental restoration market in Germany is very large, on the order of several billion US dollars per year, with a significant portion possibly available to US businesses; and (2) a large number (54) of innovative environmental restoration technologies, which are either commercially available or under development in Germany, may have some benefit to the DOE EM program and should be considered for transfer to the US.

Voss, C.F.; Roberds, W.J. [Golder Associates, Inc., Redmond, WA (United States)

1995-05-01T23:59:59.000Z

382

Sandy River Delta Habitat Restoration Project, Annual Report 2001.  

SciTech Connect

The Sandy River Delta is located at the confluence of the Sandy and Columbia Rivers, just east of Troutdale, Oregon. It comprises about 1,400 land acres north of Interstate 84, managed by the USDA Forest Service, and associated river banks managed by the Oregon Division of State Lands. Three islands, Gary, Flag and Catham, managed by Metro Greenspaces and the State of Oregon lie to the east, the Columbia River lies to the north and east, and the urbanized Portland metropolitan area lies to the west across the Sandy River. Sandy River Delta was historically a wooded, riparian wetland with components of ponds, sloughs, bottomland woodland, oak woodland, prairie, and low and high elevation floodplain. It has been greatly altered by past agricultural practices and the Columbia River hydropower system. Restoration of historic landscape components is a primary goal for this land. The Forest Service is currently focusing on restoration of riparian forest and wetlands. Restoration of open upland areas (meadow/prairie) would follow substantial completion of the riparian and wetland restoration. The Sandy River Delta is a former pasture infested with reed canary grass, blackberry and thistle. The limited over story is native riparian species such as cottonwood and ash. The shrub and herbaceous layers are almost entirely non-native, invasive species. Native species have a difficult time naturally regenerating in the thick, competing reed canary grass, Himalayan blackberry and thistle. A system of drainage ditches installed by past owners drains water from historic wetlands. The original channel of the Sandy River was diked in the 1930's, and the river diverted into the ''Little Sandy River''. The original Sandy River channel has subsequently filled in and largely become a slough. The FS acquired approximately 1,400 acres Sandy River Delta (SRD) in 1991 from Reynolds Aluminum (via the Trust for Public Lands). The Delta had been grazed for many years but shortly after FS acquisition grazing was terminated while a master plan and Environmental Impact Statement (EIS) were developed for the site. During the following three years, the vegetation changed dramatically as a result of cessation of grazing. The dramatic changes included the explosive increases of reed canary grass monocultures in wet areas and the expansion of Himalayan blackberries throughout the site.

Kelly, Virginia; Dobson, Robin L.

2002-11-01T23:59:59.000Z

383

2004 SITE ENVIRONMENTAL REPORT  

Science Conference Proceedings (OSTI)

Each year, Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1A, Environment, Safety and Health Reporting of the U.S. Department of Energy (DOE). The SER is written to inform the public, regulators, Laboratory employees, and other stakeholders of BNL's environmental performance during the calendar year in review. The report summarizes BNL's environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and restoration and surveillance monitoring programs. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. The SER is intended to be a technical document. It is available in print and as a downloadable file on the BNL web page at http://www.bnl.gov/esd/SER.htm. A summary of the SER is also prepared each year to provide a general overview of the report, and is distributed with a CD version of the full report. The summary supports BNL's educational and community outreach program.

BROOKHAVEN NATIONAL LABORATORY; SER TEAM; ENVIRONMENTAL INFORMATION MANAGEMENT SERVICES GROUP; ENVIROMENTAL AND WASTE MANAGEMENT SERVICES DIVISION FIELD SAMPLING TEAM; (MANY OTHER CONTRIBUTORS)

2005-08-22T23:59:59.000Z

384

2007 Site Environmental Report  

Science Conference Proceedings (OSTI)

Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1A, Environment, Safety and Health Reporting of the U.S. Department of Energy. The report is written to inform the public, regulators, employees, and other stakeholders of the Laboratory's environmental performance during the calendar year in review. Volume I of the SER summarizes environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and performance in restoration and surveillance monitoring programs. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. Volume II of the SER, the Groundwater Status Report, also is prepared annually to report on the status of and evaluate the performance of groundwater treatment systems at the Laboratory. Volume II includes detailed technical summaries of groundwater data and its interpretation, and is intended for internal BNL users, regulators, and other technically oriented stakeholders. A brief summary of the information contained in Volume II is included in this volume in Chapter 7, Groundwater Protection. Both reports are available in print and as downloadable files on the BNL web page at http://www.bnl.gov/ewms/ser/. An electronic version on compact disc is distributed with each printed report. In addition, a summary of Volume I is prepared each year to provide a general overview of the report, and is distributed with a compact disc containing the-length report.

Ratel,K.

2008-10-01T23:59:59.000Z

385

Environmental Groundwater Monitoring Report  

Office of Legacy Management (LM)

-460 -460 Environmental Groundwater Monitoring Report Third Quarter, 1997 October 1997 Approved for public release; further dissemination unlimited. Environmental Restoration U.S. Department of Energy Nevada Operations Office This report has been reproduced directly from the best available copy. 1 - I : ~vailablk to DOE and DOE contractors from the. Office of Scientific - and Technical .Information, P.O. Box 62, Oak Ridge, TN 3783 1 ; prices available from (423) 576-840 1. Available to the public from the National Technical Information Service, U.S. Department of Commerce, 5285 Port Royal Rd., Springfield, VA 22 16 1, telephone (703) 487-4650. RULISON SITE GROUNDWATER MONITORING REPORT THIRD QUARTER, 1997 DOE Nevada Operations Office Las Vegas, Nevada

386

Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rationale Health Forests Restoration Act of 2003 area. Migratory Birds Migratory Bird Treaty Act of 1918 EO 131186 X Migratory birds may be affected by the construction of the...

387

Process for restoring membrane permeation properties  

DOE Patents (OSTI)

A process for restoring the selectivity of high-flee-volume, glassy polymer membranes for condensable components over less-condensable components or non-condensable components of a gas mixture. The process involves exposing the membrane to suitable sorbent vapor, such as propane or butane, thereby reopening the microvoids that make up the free volume. The selectivity of an aged membrane may be restored to 70-100% of its original value. The selectivity of a membrane which is known to age over time can also be maintained by keeping the membrane in a vapor environment when it is not in use.

Pinnau, Ingo (Palo Alto, CA); Toy, Lora G. (San Francisco, CA); Casillas, Carlos G. (San Jose, CA)

1997-05-20T23:59:59.000Z

388

Process for restoring membrane permeation properties  

DOE Patents (OSTI)

A process is described for restoring the selectivity of high-free-volume, glassy polymer membranes for condensable components over less-condensable components or non-condensable components of a gas mixture. The process involves exposing the membrane to suitable sorbent vapor, such as propane or butane, thereby reopening the microvoids that make up the free volume. The selectivity of an aged membrane may be restored to 70--100% of its original value. The selectivity of a membrane which is known to age over time can also be maintained by keeping the membrane in a vapor environment when it is not in use. 8 figs.

Pinnau, I.; Toy, L.G.; Casillas, C.G.

1997-05-20T23:59:59.000Z

389

DOE/EA-1149; Environmental Assessment: Closure of the Waste Calcining Facility, Idaho Nation Engineering Laboratory (and FONSI)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 July 1996 Environmental Assessment Closure of the Waste Calcining Facility (CPP-633), Idaho National Engineering Laboratory U. S. DEPARTMENT OF ENERGY FINDING OF NO SIGNIFICANT IMPACT FOR THE CLOSURE OF THE WASTE CALCINING FACILITY AT THE IDAHO NATIONAL ENGINEERING LABORATORY Agency: U. S. Department of Energy (DOE) Action: Finding of No Significant Impact SUMMARY: The DOE-Idaho Operations Office has prepared an environmental assessment (EA) to analyze the environmental impacts of closing the Waste Calcining Facility (WCF) at the Idaho National Engineering Laboratory (INEL). The purpose of the action is to reduce the risk of radioactive exposure and release of radioactive and hazardous constituents and eliminate the need for extensive long-term surveillance and maintenance. DOE has determined that the closure is needed to reduce the risks to human

390

ENVIRONMENTAL MANAGEMENT SITE SPECIFIC ADVISORY BOARD  

NLE Websites -- All DOE Office Websites (Extended Search)

DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY ENVIRONMENTAL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD (EM SSAB) Savannah River Site Application No. (Please leave blank) ______________ MEMBERSHIP APPLICATION ________________________________________________________________________________________________ The EM SSAB provides meaningful opportunity for collaborative dialogue among the diverse communities at the Department of Energy (DOE) Environmental Management (EM) clean-up sites. At the request of the Assistant Secretary or the Site Manager/Assistant Manager for Environmental Management, the Board provides advice and recommendations concerning the following EM site-specific issues: clean-up standards and environmental restoration; waste management and disposition; stabilization and disposition of non-stockpile nuclear materials;

391

Method of restoring degraded solar cells  

DOE Patents (OSTI)

Amorphous silicon solar cells have been shown to have efficiencies which degrade as a result of long exposure to light. Annealing such cells in air at a temperature of about 200 C for at least 30 minutes restores their efficiency. 2 figs.

Staebler, D.L.

1983-02-01T23:59:59.000Z

392

Method of restoring degraded solar cells  

DOE Patents (OSTI)

Amorphous silicon solar cells have been shown to have efficiencies which degrade as a result of long exposure to light. Annealing such cells in air at a temperature of about 200.degree. C. for at least 30 minutes restores their efficiency.

Staebler, David L. (Lawrenceville, NJ)

1983-01-01T23:59:59.000Z

393

Scaling Restoration Projects for 316(b) Compliance  

Science Conference Proceedings (OSTI)

This report examines fish stocking as a restoration approach for offsetting impingement mortality and entrainment at power plant cooling water intake structures. It will provide information to industry, resource agencies, and non-governmental organizations involved in the 316(b) regulatory process.

2006-07-11T23:59:59.000Z

394

Willamette River Habitat Protection and Restoration Program  

E-Print Network (OSTI)

.............................................................................6 a. The Challenge of Restoration in a Large River/Flood Plain System.............6 b. The Need Goals: Anchor Habitats as Stepping Stones....................20 f. Measuring Results-purpose dams and reservoirs as part of the Federal Columbia River Power System, as well as 42 miles of bank

395

2006 Site Environmental Report brookhaven national laboratory  

E-Print Network (OSTI)

- ticipation, designing a system to compost animal bedding, and for recycling and reusing waste concrete.........................................................................18 Environmental Restoration Program............19 Radiological Dose Assessment Program....20 Dose products (known as "affirmative pro- curement") n Conserve natural resources and energy n Reuse and recycle

Homes, Christopher C.

396

DARRP -Protecting and restoring natural resources nationwide Protecting and Restoring Natural Resources in Hawaii  

E-Print Network (OSTI)

(Kalaeloa) - see case highlights. Coral reef habitat obliter- ated by the M/V Cape Flattery Ship Grounding removed from reefs in Hawaii. Emergency restoration at Kalaeloa (Barbers Point) recementing 2800 dislodged

397

1999 SITE ENVIRONMENTAL REPORT  

SciTech Connect

Throughout the scientific community, Brookhaven National Laboratory (BNL) is renowned for its leading-edge research in physics, medicine, chemistry, biology, materials, and the environment. BNL is committed to supporting its world-class scientific research with an internationally recognized environmental protection program. The 1999 Site Environmental Report (SER) summarizes the status of the Laboratory's environmental programs and performance, including the steady progress towards cleaning up the site and fully integrating environmental stewardship into all facets of the Laboratory's mission. BNL is located on 5,265 acres of pine barrens in Suffolk County in the center of Long Island, New York. The Laboratory is situated above a sole source aquifer at the headwaters of the Peconic River; therefore, protecting ground and surface water quality is a special concern. Approximately 3,600 acres of the site are undeveloped and serve as habitat for a wide variety of animals and plants, including one New York State endangered species, the tiger salamander, and two New York State threatened species, the banded sunfish and the stiff goldenrod. Monitoring, preserving, and restoring these ecological resources is a high priority for the Laboratory.

ENGEL-COX,J.; ZIMMERMAN,E.; LEE,R.; WILLIAMS,J.; GREEN,T.; PAQUETTE,D.; HOODA,B.; SCARPITTA,S.; GENZER,P.; ET AL

2000-09-01T23:59:59.000Z

398

Environmental Impact Statements (EIS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 1, 1995 October 1, 1995 EIS-0245: Draft Environmental Impact Statement Management of Spent Nuclear Fuel from the K Basins at the Hanford Site, Richland, Washington July 21, 1995 EIS-0182: Final Programmatic Environmental Impact Statement Energy Planning And Management Program July 1, 1995 EIS-0217: Final Environmental Impact Statement Savannah River Site Waste Management May 1, 1995 EIS-0228: Final Environmental Impact Statement Dual Axis Radiographic Hydrodynamic Test (DARHT) Facility April 1, 1995 EIS-0203: Programmatic Final Environmental Impact Statement Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs January 1, 1995 EIS-0220: Final Environmental Impact Statement Savannah River Site, Interim Management of Nuclear Materials

399

Final Strategic Plan Released by Gulf Coast Ecosystem Restoration Taskforce  

Energy.gov (U.S. Department of Energy (DOE))

Today (December 5) the Gulf Coast Ecosystem Restoration Task Force released its final strategy for long-term restoration in the Gulf, a path forward based on input fromstates, tribes, federal...

400

A Revised ForceRestore Model for Land Surface Modeling  

Science Conference Proceedings (OSTI)

To clarify the definition of the equation for the temperature toward which the soil skin temperature is restored, the prediction equations in the commonly used forcerestore model for soil temperature are rederived from the heat conduction ...

Diandong Ren; Ming Xue

2004-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "inel environmental restoration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Wetlands restoration panel worries over loss of money for monitoring  

E-Print Network (OSTI)

in the coal mine" for gauging the success of restoration programs. "We still need to do something," Scarpa

Belogay, Eugene A.

402

Pinellas Plant annual site environmental report for calendar year 1993  

Science Conference Proceedings (OSTI)

Martin Marietta Specialty Components, Inc., and the US Department of Energy are committed to successfully administering a high quality Environmental Management Program at the Pinellas Plant in Pinellas County, Florida. Part of this commitment includes accurately documenting and communicating to the Pinellas Plant stakeholder the results of their environmental compliance and monitoring activities. The Annual Site Environmental Report presents a comprehensive summary of the results of the environmental monitoring, waste management, and environmental restoration programs at the Pinellas Plant for 1993. This report also includes the plant`s performance in the areas of compliance with applicable regulatory requirements and standards and identifies major environmental management program initiatives and accomplishments for 1993.

Not Available

1994-06-10T23:59:59.000Z

403

Restoration of X-ray fluorescence images of hidden paintings  

Science Conference Proceedings (OSTI)

This paper describes our methods for repairing and restoring images of hidden paintings (paintings that have been painted over and are now covered by a new surface painting) that have been obtained via noninvasive X-ray fluorescence imaging of their ... Keywords: Art restoration, Artifact correction, Image restoration, Underdetermined source separation

Anila Anitha; Andrei Brasoveanu; Marco Duarte; Shannon Hughes; Ingrid Daubechies; Joris Dik; Koen Janssens; Matthias Alfeld

2013-03-01T23:59:59.000Z

404

Dynamic physical and economic modelling of riparian restoration options  

Science Conference Proceedings (OSTI)

A dynamic simulation framework is used to compare benefit-cost ratios of riparian restoration investment strategies to pursue ecosystem service benefits. The model is meant to be adaptable to generic restoration planning applications, with the Middle ... Keywords: Adaptive management, Benefit-cost analysis, Choice experiment, Dynamic simulation, Ecosystem service, Rio Grande, River restoration

Matthew A. Weber; Vincent C. Tidwell; Jennifer A. Thacher

2010-12-01T23:59:59.000Z

405

A unified method for optimizing linear image restoration filters  

Science Conference Proceedings (OSTI)

Image restoration from degraded images lies at the foundation of image processing, pattern recognition, and computer vision, so it has been extensively studied. A large number of image restoration filters have been devised so far. It is known that a ... Keywords: denoising, image restoration, linear filter, moving-average filter, subspace information criterion (SIC)

Masashi Sugiyama; Hidemitsu Ogawa

2002-11-01T23:59:59.000Z

406

Idaho National Engineering Laboratory installation roadmap document. Revision 1  

SciTech Connect

The roadmapping process was initiated by the US Department of Energy`s office of Environmental Restoration and Waste Management (EM) to improve its Five-Year Plan and budget allocation process. Roadmap documents will provide the technical baseline for this planning process and help EM develop more effective strategies and program plans for achieving its long-term goals. This document is a composite of roadmap assumptions and issues developed for the Idaho National Engineering Laboratory (INEL) by US Department of Energy Idaho Field Office and subcontractor personnel. The installation roadmap discusses activities, issues, and installation commitments that affect waste management and environmental restoration activities at the INEL. The High-Level Waste, Land Disposal Restriction, and Environmental Restoration Roadmaps are also included.

1993-05-30T23:59:59.000Z

407

Big Canyon Creek Ecological Restoration Strategy.  

DOE Green Energy (OSTI)

He-yey, Nez Perce for steelhead or rainbow trout (Oncorhynchus mykiss), are a culturally and ecologically significant resource within the Big Canyon Creek watershed; they are also part of the federally listed Snake River Basin Steelhead DPS. The majority of the Big Canyon Creek drainage is considered critical habitat for that DPS as well as for the federally listed Snake River fall chinook (Oncorhynchus tshawytscha) ESU. The Nez Perce Soil and Water Conservation District (District) and the Nez Perce Tribe Department of Fisheries Resources Management-Watershed (Tribe), in an effort to support the continued existence of these and other aquatic species, have developed this document to direct funding toward priority restoration projects in priority areas for the Big Canyon Creek watershed. In order to achieve this, the District and the Tribe: (1) Developed a working group and technical team composed of managers from a variety of stakeholders within the basin; (2) Established geographically distinct sub-watershed areas called Assessment Units (AUs); (3) Created a prioritization framework for the AUs and prioritized them; and (4) Developed treatment strategies to utilize within the prioritized AUs. Assessment Units were delineated by significant shifts in sampled juvenile O. mykiss (steelhead/rainbow trout) densities, which were found to fall at fish passage barriers. The prioritization framework considered four aspects critical to determining the relative importance of performing restoration in a certain area: density of critical fish species, physical condition of the AU, water quantity, and water quality. It was established, through vigorous data analysis within these four areas, that the geographic priority areas for restoration within the Big Canyon Creek watershed are Big Canyon Creek from stream km 45.5 to the headwaters, Little Canyon from km 15 to 30, the mainstem corridors of Big Canyon (mouth to 7km) and Little Canyon (mouth to 7km). The District and the Tribe then used data collected from the District's stream assessment and inventory, utilizing the Stream Visual Assessment Protocol (SVAP), to determine treatment necessary to bring 90% of reaches ranked Poor or Fair through the SVAP up to good or excellent. In 10 year's time, all reaches that were previously evaluated with SVAP will be reevaluated to determine progress and to adapt methods for continued success. Over 400 miles of stream need treatment in order to meet identified restoration goals. Treatments include practices which result in riparian habitat improvements, nutrient reductions, channel condition improvements, fish habitat improvements, invasive species control, water withdrawal reductions, improved hydrologic alterations, upland sediment reductions, and passage barrier removal. The Nez Perce Soil and Water Conservation District (District) and the Nez Perce Tribe Department of Fisheries Resource Management Watershed Division (Tribe) developed this document to guide restoration activities within the Big Canyon Creek watershed for the period of 2008-2018. This plan was created to demonstrate the ongoing need and potential for anadromous fish habitat restoration within the watershed and to ensure continued implementation of restoration actions and activities. It was developed not only to guide the District and the Tribe, but also to encourage cooperation among all stakeholders, including landowners, government agencies, private organizations, tribal governments, and elected officials. Through sharing information, skills, and resources in an active, cooperative relationships, all concerned parties will have the opportunity to join together to strengthen and maintain a sustainable natural resource base for present and future generations within the watershed. The primary goal of the strategy is to address aquatic habitat restoration needs on a watershed level for resident and anadromous fish species, promoting quality habitat within a self-sustaining watershed. Seven objectives have been developed to support this goal: (1) Identify factors limiting quality

Rasmussen, Lynn; Richardson, Shannon

2007-10-01T23:59:59.000Z

408

Big Canyon Creek Ecological Restoration Strategy.  

Science Conference Proceedings (OSTI)

He-yey, Nez Perce for steelhead or rainbow trout (Oncorhynchus mykiss), are a culturally and ecologically significant resource within the Big Canyon Creek watershed; they are also part of the federally listed Snake River Basin Steelhead DPS. The majority of the Big Canyon Creek drainage is considered critical habitat for that DPS as well as for the federally listed Snake River fall chinook (Oncorhynchus tshawytscha) ESU. The Nez Perce Soil and Water Conservation District (District) and the Nez Perce Tribe Department of Fisheries Resources Management-Watershed (Tribe), in an effort to support the continued existence of these and other aquatic species, have developed this document to direct funding toward priority restoration projects in priority areas for the Big Canyon Creek watershed. In order to achieve this, the District and the Tribe: (1) Developed a working group and technical team composed of managers from a variety of stakeholders within the basin; (2) Established geographically distinct sub-watershed areas called Assessment Units (AUs); (3) Created a prioritization framework for the AUs and prioritized them; and (4) Developed treatment strategies to utilize within the prioritized AUs. Assessment Units were delineated by significant shifts in sampled juvenile O. mykiss (steelhead/rainbow trout) densities, which were found to fall at fish passage barriers. The prioritization framework considered four aspects critical to determining the relative importance of performing restoration in a certain area: density of critical fish species, physical condition of the AU, water quantity, and water quality. It was established, through vigorous data analysis within these four areas, that the geographic priority areas for restoration within the Big Canyon Creek watershed are Big Canyon Creek from stream km 45.5 to the headwaters, Little Canyon from km 15 to 30, the mainstem corridors of Big Canyon (mouth to 7km) and Little Canyon (mouth to 7km). The District and the Tribe then used data collected from the District's stream assessment and inventory, utilizing the Stream Visual Assessment Protocol (SVAP), to determine treatment necessary to bring 90% of reaches ranked Poor or Fair through the SVAP up to good or excellent. In 10 year's time, all reaches that were previously evaluated with SVAP will be reevaluated to determine progress and to adapt methods for continued success. Over 400 miles of stream need treatment in order to meet identified restoration goals. Treatments include practices which result in riparian habitat improvements, nutrient reductions, channel condition improvements, fish habitat improvements, invasive species control, water withdrawal reductions, improved hydrologic alterations, upland sediment reductions, and passage barrier removal. The Nez Perce Soil and Water Conservation District (District) and the Nez Perce Tribe Department of Fisheries Resource Management Watershed Division (Tribe) developed this document to guide restoration activities within the Big Canyon Creek watershed for the period of 2008-2018. This plan was created to demonstrate the ongoing need and potential for anadromous fish habitat restoration within the watershed and to ensure continued implementation of restoration actions and activities. It was developed not only to guide the District and the Tribe, but also to encourage cooperation among all stakeholders, including landowners, government agencies, private organizations, tribal governments, and elected officials. Through sharing information, skills, and resources in an active, cooperative relationships, all concerned parties will have the opportunity to join together to strengthen and maintain a sustainable natural resource base for present and future generations within the watershed. The primary goal of the strategy is to address aquatic habitat restoration needs on a watershed level for resident and anadromous fish species, promoting quality habitat within a self-sustaining watershed. Seven objectives have been developed to support this goal: (1) Identify factors limiting quality

Rasmussen, Lynn; Richardson, Shannon

2007-10-01T23:59:59.000Z

409

Strategic planning for power system restorations  

SciTech Connect

This paper considers the power system restoration planning problem (PSRPP) for disaster recovery, a fundamental problem faced by all populated areas. PSRPPs are complex stochastic optimization problems that combine resource allocation, warehouse location, and vehicle routing considerations. Furthermore, electrical power systems are complex systems whose behavior can only be determined by physics simulations. Moreover, these problems must be solved under tight runtime constraints to be practical in real-world disaster situations. This work is three fold: (1) it formalizes the specification of PSRPPs; (2) introduces a simple optimization-simulation hybridization necessary for solving PSRPPs; and (3) presents a complete restoration algorithm that utilizes the strengths of mixed integer programming, constraint programming, and large neighborhood search. This paper studied a novel problem in the field of humanitarian logistics, the Power System Restoration Problem (PSRPP). The PSRPP models the strategic planning process for post disaster power system recovery. The paper proposed a multi-stage stochastic hybrid optimization algorithm that yields high quality solutions to real-world benchmarks provided by Los Alamos National Laboratory (LANL). The algorithm uses a variety of technologies, including MIP, constraint programming, and large neighborhood search, to exploit the structure of each individual optimization subproblem. The experimental results on hurricane disaster benchmarks indicate that the algorithm is practical from a computational standpoint and produce significant improvements over existing relief delivery procedures.

Bent, Russell W [Los Alamos National Laboratory; Van Hententyck, Pascal [BROWN UNIV.; Coffrin, Carleton [BROWN UNIV.

2010-10-12T23:59:59.000Z

410

Idaho National Engineering Laboratory Waste Area Groups 1-7 and 10 Technology Logic Diagram. Volume 2  

Science Conference Proceedings (OSTI)

The Idaho National Engineering Laboratory (INEL) Technology Logic Diagram (TLD) was developed to provide a decision support tool that relates Environmental Restoration (ER) and Waste Management (WM) problems at the INEL to potential technologies that can remediate these problems. The TLD identifies the research, development, demonstration, testing, and evaluation needed to develop these technologies to a state that allows technology transfer and application to an environmental restoration need. It is essential that follow-on engineering and system studies be conducted to build on the output of this project. These studies will begin by selecting the most promising technologies identified in this TLD and finding an optimum mix of technologies that will provide a socially acceptable balance between cost and risk to meet the site windows of opportunity. The TLD consists of three separate volumes: Volume I includes the purpose and scope of the TLD, a brief history of the INEL Waste Area Groups, and environmental problems they represent. A description of the TLD, definitions of terms, a description of the technology evaluation process, and a summary of each subelement, is presented. Volume II (this volume) describes the overall layout and development of the TLD in logic diagram format. This section addresses the environmental restoration of contaminated INEL sites. Specific INEL problem areas/contaminants are identified along with technology solutions, the status of the technologies, precise science and technology needs, and implementation requirements. Volume III provides the Technology Evaluation Data Sheets (TEDS) for Environmental Restoration and Waste Management (EM) activities that are referenced by a TEDS codenumber in Volume II. Each of these sheets represents a single logic trace across the TLD. These sheets contain more detail than provided for technologies in Volume II.

O`Brien, M.C.; Meservey, R.H.; Little, M.; Ferguson, J.S.; Gilmore, M.C.

1993-09-01T23:59:59.000Z

411

EA-1454: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Final Environmental Assessment 4: Final Environmental Assessment EA-1454: Final Environmental Assessment Reactivation and Use of Three Former Borrow Sites in the 100-F,100-H, and 100-N Areas The U.S. Department of Energy (DOE) needs to restore areas after remedial action. The purpose of this action is to supply raw aggregate material (approximately 1,104,000 bank cubic meters [bcm]) to be used as backfill for restoration projects in the 100-F, 100-H, 100-N, and 100-K Areas of the Hanford Site near Richland, Washington. Environmental Assessment Reactivation and Use of Three Former Borrow Sites in the 100-F,100-H, and 100-N Areas DOE/EA-1454 (March 2003) More Documents & Publications EA-1454: Finding of No Significant Impact EA-1934: Final Environmental Assessment EA-1934: Draft Environmental Assessment

412

A framework for evaluating innovative statistical and risk assessment tools to solve environment restoration problems  

Science Conference Proceedings (OSTI)

Environmental restoration activities at the US Department of Energy (DOE) Hanford site face complex issues due to history of varied past contaminant disposal practices. Data collection and analysis required for site characterization, pathway modeling, and remediation selection decisions must deal with inherent uncertainties and unique problems associated with the restoration. A framework for working through the statistical aspects of the site characterization and remediation selection problems is needed. This framework would facilitate the selection of appropriate statistical tools for solving unique aspects of the environmental restoration problem. This paper presents a framework for selecting appropriate statistical and risk assessment methods. The following points will be made: (1) pathway modelers and risk assessors often recognize that ``some type`` of statistical methods are required but don`t work with statisticians on tools development in the early planning phases of the project; (2) statistical tools selection and development are problem-specific and often site-specific, further indicating a need for up-front involvement of statisticians; and (3) the right tool, applied in the right way can minimize sampling costs, get as much information as possible out of the data that does exist, provide consistency and defensibility for the results, and given structure and quantitative measures to decision risks and uncertainties.

Hassig, N.L.; Gilbert, R.O.; Pulsipher, B.A.

1991-09-01T23:59:59.000Z

413

A framework for evaluating innovative statistical and risk assessment tools to solve environment restoration problems  

Science Conference Proceedings (OSTI)

Environmental restoration activities at the US Department of Energy (DOE) Hanford site face complex issues due to history of varied past contaminant disposal practices. Data collection and analysis required for site characterization, pathway modeling, and remediation selection decisions must deal with inherent uncertainties and unique problems associated with the restoration. A framework for working through the statistical aspects of the site characterization and remediation selection problems is needed. This framework would facilitate the selection of appropriate statistical tools for solving unique aspects of the environmental restoration problem. This paper presents a framework for selecting appropriate statistical and risk assessment methods. The following points will be made: (1) pathway modelers and risk assessors often recognize that some type'' of statistical methods are required but don't work with statisticians on tools development in the early planning phases of the project; (2) statistical tools selection and development are problem-specific and often site-specific, further indicating a need for up-front involvement of statisticians; and (3) the right tool, applied in the right way can minimize sampling costs, get as much information as possible out of the data that does exist, provide consistency and defensibility for the results, and given structure and quantitative measures to decision risks and uncertainties.

Hassig, N.L.; Gilbert, R.O.; Pulsipher, B.A.

1991-09-01T23:59:59.000Z

414

2010 Site Environmental Report  

SciTech Connect

Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1A, Environment, Safety and Health Reporting of the U.S. Department of Energy. The report is written to inform the public, regulators, employees, and other stakeholders of the Laboratory's environmental performance during the calendar year in review. Volume I of the SER summarizes environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and performance in restoration and surveillance monitoring programs. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. Volume II of the SER, the Groundwater Status Report, also is prepared annually to report on the status of and evaluate the performance of groundwater treatment systems at the Laboratory. Volume II includes detailed technical summaries of groundwater data and its interpretation, and is intended for internal BNL users, regulators, and other technically oriented stakeholders. A brief summary of the information contained in Volume II is included in Chapter 7, Groundwater Protection, of this volume. Both reports are available in print and as downloadable files on the BNL web page at http://www.bnl.gov/ewms/ser/. An electronic version on compact disc is distributed with each printed report. In addition, a summary of Volume I is prepared each year to provide a general overview of the report, and is distributed with a compact disc containing the full report. BNL is operated and managed for DOE's Office of Science by Brookhaven Science Associates (BSA), a partnership formed by Stony Brook University and Battelle Memorial Institute. For more than 60 years, the Laboratory has played a lead role in the DOE Science and Technology mission and continues to contribute to the DOE missions in energy resources, environmental quality, and national security. BNL manages its world-class scientific research with particular sensitivity to environmental issues and community concerns. The Laboratory's motto, 'Exploring Life's Mysteries...Protecting its Future,' and its Environmental, Safety, Security and Health Policy reflect the commitment of BNL's management to fully integrate environmental stewardship into all facets of its mission and operations.

Ratel, K.; Lee, R; Remien, J; Hooda, B; Green, T; Williams, J; Pohlot, P; Dorsch, W; Paquette, D; Burke, J

2011-10-01T23:59:59.000Z

415

Environmental Microbiology  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Microbiology Environmental Microbiology Environmental Microbiology Los Alamos working to identify genetic regulatory systems in single microorganisms. Get Expertise Cheryl Kuske DOE BER Biological System Science Division Program Manager Email Srinivas Iyer Bioscience Group Leader Email Rebecca McDonald Bioscience Communications Email Examining the soil beneath our feet Environmental microbiology Read caption + Many environmental molecular biology studies begin with purified DNA and RNA extracted from the soil. Overview of Research and Highlights Learning about microorganisms-bacteria, algae, and fungi-is essential to understanding how living things interact with their environments. Exploration of environmental microbiology at Los Alamos crosses broad scales of investigation that span from identification of genetic regulatory

416

1999 Annual Site Environmental Report --  

E-Print Network (OSTI)

The Tonopah Test Range (TTR) in Nevada is a government-owned, contractor-operated facility. Sandia National Laboratories (SNL) is run by Sandia Corporation, a subsidiary of Lockheed Martin Corporation. The U.S. Department of Energy (DOE) oversees the operations of TTR through its Kirtland Area Office (KAO), which reports to the Albuquerque Operations Office (AL). Sandia Corporation conducts operations at TTR in support of DOE's Weapons Ordnance Program and has operated the site since 1957. Westinghouse Government Services subcontracts to SNL in administering most of the environmental programs at the site. This annual report summarizes data and the compliance status of the environmental protection and monitoring program at TTR through December 31, 1999. The compliance status of environmental regulations applicable at the site include state and federal regulations governing air emissions, wastewater effluent, waste management, and Environmental Restoration (ER) cleanup activities. Terrestrial surveillance for radiological and nonradiological contaminants is also conducted, as required by DOE, to determine contaminant levels at offsite, perimeter, and onsite locations. Sandia Corporation is responsible only for those environmental program activities related to SNL's operations. The DOE Nevada Operations office (NVOO) retains responsibility for the cleanup and management of ER sites at TTR. Environmental monitoring and surveillance programs are required by DOE Order 5400.1, General Environmental Protection Program (DOE 1990), and DOE Order 231.1, Environment, Safety and Health Reporting (DOE 1996a).

Dianne Duncan; William Forston; Rebecca Sanchez

2000-01-01T23:59:59.000Z

417

Public Service Company of Colorado v. Batt Agreement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Settlement Agreement: Public Service Company of Colorado v. Batt Settlement Agreement: Public Service Company of Colorado v. Batt EM Home | Regulatory Compliance | Environmental Compliance Agreements Settlement Agreement: Public Service Company of Colorado v. Batt Table of Contents A. Definitions B. Transuranic Waste Shipments Leaving Idaho C. Spent Fuel & High-Level Waste Shipments Leaving Idaho D. Shipments of Spent Fuel to INEL E. Treatment & Transfer of Existing Wastes at INEL F. Spent Fuel Programs G. INEL Environmental Restoration Program H. Obtaining Timely Federal Funding for Compliance with This Order I. Federal Funds for This Settlement Agreement J. Good Faith Compliance & Affirmative Support K. Enforcement L. Consent Order Commitments of Consent Order of October 17, 1995 and Appended Settlement Agreement

418

Environmental Education and Development Program  

SciTech Connect

The Environmental Education and Development Program is a component on the effort to accomplish the Office of Environmental Restoration and Waste Management`s (EM) goal of environmental compliance and cleanup of the 1989 inventory of inactive DOE sites and facilities by the year 2019. Education and Development programs were designed specifically to stimulate the knowledge and workforce capability necessary to achieve EM goals while contributing to DOE`s overall goal of increasing scientific and technical literacy and competency. The primary implementation criterion for E&D activities involved a focus on programs and projects that had both immediate and long-range leveraging effects on infrastructure. This focus included programs that yielded short term results (one to five years), as well as long-term results, to ensure a steady supply of appropriately trained and educated human resources, including women and minorities, to meet EM`s demands.

Not Available

1994-03-01T23:59:59.000Z

419

Management Assessment Quality Assurance Guidance in support of EM environmental sampling and analysis activities  

SciTech Connect

This document is one of several guidance documents developed by DOE EM pertaining to environmental restoration and waste management sampling and analysis activities. This guidance contains performance objectives and representative assessment criteria that can be used to conduct management assessments.

1994-05-01T23:59:59.000Z

420

ENVIRONMENTAL PERSPECTIVES  

E-Print Network (OSTI)

.S. Department of Health and Human Services Assessing the Ecotoxicologic Hazards of a Pandemic Influenza MedicalENVIRONMENTAL HEALTH PERSPECTIVES ENVIRONMENTAL HEALTH PERSPECTIVES National Institutes of Health U75012, France 4 Computational Epidemiology Laboratory, Institute for Scientific Interchange, Turin