  1. INDEPENDENT VERIFICATION SURVEY REPORT FOR THE OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT

    SciTech Connect (OSTI)

    W.C. Adams

    2010-05-24

    INDEPENDENT VERIFICATION SURVEY REPORT FOR THE OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT, MIAMISBURG, OHIO DCN: 0468-SR-02-0

  2. INDEPENDENT VERIFICATION SURVEY REPORT OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT

    SciTech Connect (OSTI)

    W.C. Adams

    2010-07-21

    INDEPENDENT VERIFICATION SURVEY REPORT FOR THE OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT, MIAMISBURG, OHIO DCN: 0468-SR-03-0

  3. Independent Verification Survey Report for the Operable Unit-1 Miamisburg Closure Project, Miamisburg, OH

    SciTech Connect (OSTI)

    Weaver, P.

    2008-03-17

    The objectives of the independent verification survey were to confirm that remedial actions have been effective in meeting established release criteria and that documentation accurately and adequately describes the current radiological and chemical conditions of the MCP site.

  4. INDEPENDENT VERIFICATION SURVEY OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT OUTSIDE AREAS BROOKHAVEN NATIONAL LABORATORY UPTON, NEW YORK

    SciTech Connect (OSTI)

    P.C. Weaver

    2010-12-15

    5098-SR-03-0 FINAL REPORT- INDEPENDENT VERIFICATION SURVEY OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT OUTSIDE AREAS, BROOKHAVEN NATIONAL LABORATORY

  5. INDEPENDENT VERIFICATION SURVEY REPORT FOR ZONE 1 OF THE EAST TENNESSEE TECHNOLOGY PARK IN OAK RIDGE, TENNESSEE

    SciTech Connect (OSTI)

    King, David A.

    2012-08-16

    Oak Ridge Associated Universities (ORAU) conducted in-process inspections and independent verification (IV) surveys in support of DOE's remedial efforts in Zone 1 of East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. Inspections concluded that the remediation contractor's soil removal and survey objectives were satisfied and the dynamic verification strategy (DVS) was implemented as designed. Independent verification (IV) activities included gamma walkover surveys and soil sample collection/analysis over multiple exposure units (EUs).

  6. ORISE: Independent verification

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Independent verification ORISE techinician performs environmental scanning The Oak Ridge Institute for Science and Education (ORISE) performs independent environmental assessments and verification to determine the effectiveness of radiological cleanup at decontamination and decommissioning (D&D) projects across the United States. Since 1980, ORISE has performed independent verification at more than 500 sites in 42 states and the District of Columbia. As the primary independent verification

  7. Results of the independent radiological verification survey at the former Bridgeport Brass Company Facility, Seymour, Connecticut (SSC001)

    SciTech Connect (OSTI)

    Foley, R.D.; Rice, D.E.; Allred, J.F.; Brown, K.S.

    1995-03-01

    At the request of the USDOE, a team from ORNL conducted an independent radiological verification survey at the former Bridgeport Brass Company Facility, Seymour, Connecticut, from September 1992 to March 1993. Purpose of the survey was to determine whether residual levels of radioactivity inside the Ruffert Building and selected adjacent areas were rmediated to levels below DOE guidelines for FUSRAP sites. The property was contaminated with radioactive residues of {sup 238}U from uranium processing experiments conducted by Reactive Metals, Inc., from 1962 to 1964 for the Atomic Energy Commission. A previous radiological survey did not characterize the entire floor space because equipment which could not be moved at the time made it inaccessible for radiological surveys. During the remediation process, additional areas of elevated radioactivity were discovered under stationary equipment, which required additional remediation and further verification. Results of the independent radiological verification survey confirm that, with the exception of the drain system inside the building, residual uranium contamination has been remediated to levels below DOE guidelines for unrestricted release of property at FUSRAP sites inside and outside the Ruffert Building. However, certain sections of the drain system retain uranium contamination above DOE surface guideline levels. These sections of pipe are addressed in separate, referenced documentation.

  8. Final Report Independent Verification Survey of the High Flux Beam Reactor, Building 802 Fan House Brookhaven National Laboratory Upton, New York

    SciTech Connect (OSTI)

    Harpeneau, Evan M.

    2011-06-24

    On May 9, 2011, ORISE conducted verification survey activities including scans, sampling, and the collection of smears of the remaining soils and off-gas pipe associated with the 802 Fan House within the HFBR (High Flux Beam Reactor) Complex at BNL. ORISE is of the opinion, based on independent scan and sample results obtained during verification activities at the HFBR 802 Fan House, that the FSS (final status survey) unit meets the applicable site cleanup objectives established for as left radiological conditions.

  9. ORISE: Independent verification

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    cleanup at decontamination and decommissioning (D&D) projects across the United States. ... and validation of contractors' final status survey procedures increases the ...

  10. INDEPENDENT VERIFICATION SURVEY OF THE SPRU LOWER LEVEL HILLSIDE AREA AT THE KNOLLS ATOMIC POWER LABORATORY NISKAYUNA, NEW YORK

    SciTech Connect (OSTI)

    Harpenau, Evan M.; Weaver, Phyllis C.

    2012-06-06

    During August 10, 2011 through August 19, 2011, and October 23, 2011 through November 4, 2011, ORAU/ORISE conducted verification survey activities at the Separations Process Research Unit (SPRU) site that included in-process inspections, surface scans, and soil sampling of the Lower Level Hillside Area. According to the Type-B Investigation Report, Sr-90 was the primary contributor to the majority of the activity (60 times greater than the Cs-137 activity). The evaluation of the scan data and sample results obtained during verification activities determined that the primary radionuclide of concern, Sr-90, was well below the agreed upon soil cleanup objective (SCO) of 30 pCi/g for the site. However, the concentration of Cs-137 in the four judgmental samples collected in final status survey (FSS) Units A and B was greater than the SCO. Both ORAU and aRc surveys identified higher Cs-137 concentrations in FSS Units A and B; the greatest concentrations were indentified in FSS Unit A.

  11. Lessons Learned from Independent Verification Activities

    Office of Environmental Management (EM)

    Demonstration Oak Ridge Institute for Science and Education - Independent Verification Lessons Learned IV - performed at nine DOE sites from 2004 to 2008 Page 1 of 2 Oak Ridge ...

  12. FINAL REPORT INDEPENDENT VERIFICATION SURVEY SUMMARY AND RESULTS FOR THE ARGONNE NATIONAL LABORATORY BUILDING 330 PROJECT FOOTPRINT, ARGONNE, ILLINOIS

    SciTech Connect (OSTI)

    ERIKA N. BAILEY

    2012-02-29

    ORISE conducted onsite verification activities of the Building 330 project footprint during the period of June 6 through June 7, 2011. The verification activities included technical reviews of project documents, visual inspections, radiation surface scans, and sampling and analysis. The draft verification report was issued in July 2011 with findings and recommendations. The contractor performed additional evaluations and remediation.

  13. Final Report - Independent Verification Survey Report for the Waste Loading Area, Former Hazardous Waste Management Facility, Brookhaven National Laboratory, Upton, New York

    SciTech Connect (OSTI)

    P.C. Weaver

    2008-08-19

    The objective of the verification survey was to obtain evidence by means of measurements and sampling to confirm that the final radiological conditions were less than the established release criteria. This objective was achieved via multiple verification components including document reviews to determine the accuracy and adequacy of FSS documentation.

  14. Results of the Independent Radiological Verification Survey of Remediation at Building 31, Former Linde Uranium Refinery, Tonawanda, New York (LI001V)

    SciTech Connect (OSTI)

    McKenzie, S.P.; Uziel, M.S.

    1998-11-01

    As part of the Formerly Utilized Sites Remedial Action Progmq a team from Oak Ridge National Laboratory (ORNL) conducted a radiological veriihtion survey of Building 31 at the former Linde Uranium Refinery, Tonawau& New York. The purpose of the survey was to ver@ that remedial action completed by the project management contractor had reduced contamination levels to within authorized limits. Prior to remediatioq tied radioactive material was prevalent throughout the building and in some of the ductwork Decontaminadon consisted of removing surfhce contamination from floors, baseboards, and overhead areas; removing some air ducts; and vacuuming dust. Building 31 at the former Linde site in TonawandA New Yorlq was thoroughly investigated inside and outside for radionuclide residues. The verification team discovered previously undetected contaminadon beneath the concrete pad on the first floor and underneath floor tiles on the second floor. All suspect floor tiles were removed and any contamination beneath them cleaned to below guideline levels. The verification team also discovered elevated radiation levels associated with overhead air lines that led to the eventual removal of the entire air lige and a complete investigation of the history of all process piping in the building. Final verification surveys showed that residual surface beta-gamma activity levels were slightly elevated in some places but below U.S. Department of Energy applicable guidelines for protection against radiation (Table 1). Similarly, removable radioactive contamination was also below applicable guidelines. Exposure rates within the building were at typical background levels, and no consistently elevated indoor radon concentrations were measured. However, radionuclide analysis of subsurface soil from beneath the concrete floor on the ground level showed concentrations of `*U and'% that exceeded applicable guidelines. At the time of this survey, there was no measured exposure pathway for this

  15. INDEPENDENT VERIFICATION SURVEY SUMMARY AND RESULTS FOR SUB-SLAB SOILS ASSOCIATED WITH THE FORMER BUILDING K-33, OAK RIDGE, TENNESSEE

    SciTech Connect (OSTI)

    NICK A. ALTIC

    2012-09-20

    At DOE’s request, ORAU conducted confirmatory surveys of the K-33 sub-slab soil during the period of August 2011 through May 2012. The survey activities included visual inspections and measurement and sampling activities. LSRS was forthcoming with information relating to surface scan results. Scans performed by the contractor were of adequate coverage and overall data appear to represent actual site conditions. However, the LSRS technicians failed to identify several areas of elevated direct gamma radiation. Most of the samples taken by ORAU at locations of elevated instrument response were above the remediation concentration for one or more radionuclides of concern (ROC). The contractor was, however, quick to perform additional remediation of areas identified to have contamination above the guidelines. Further investigation by ORAU was not requested once additional remediation was completed. It is presumed the remediation contractor’s future PCCR will present detailed and conclusive evidence that K-33 sub-slab soils either comply or do not comply with record of decision (ROD) criteria. However, ORAU concludes, based on both independent verification (IV) data and data provided by LSRS, that the remediation contractor followed appropriate and applicable procedures and that the associated data adequately represent site conditions.

  16. Interim Letter Report - Verification Survey of Partial Grid E9, David Witherspoon, Inc. 1630 Site Knoxville, Tennessee

    SciTech Connect (OSTI)

    P.C. Weaver

    2008-06-12

    Conduct verification surveys of available grids at the DWI 1630 in Knoxville, Tennessee. A representative with the Independent Environmental Assessment and Verification (IEAV) team from ORISE conducted a verification survey of a partial area within Grid E9.

  17. INDEPENDENT VERIFICATION OF THE BUILDING 3550 SLAB AT OAK RIDGE NATIONAL LABORATORY OAK RIDGE, TENNESSEE

    SciTech Connect (OSTI)

    Weaver, Phyllis C.

    2012-05-08

    The Oak Ridge Institute for Science and Education (ORISE) has completed the independent verification survey of the Building 3550 Slab. The results of this effort are provided. The objective of this verification survey is to provide independent review and field assessment of remediation actions conducted by Safety and Ecology Corporation (SEC) to document that the final radiological condition of the slab meets the release guidelines. Verification survey activities on the Building 3550 Slab that included scans, measurements, and the collection of smears. Scans for alpha, alpha plus beta, and gamma activity identified several areas that were investigated.

  18. INDEPENDENT VERIFICATION OF THE CENTRAL CAMPUS AND SOUTHEAST LABORATORY COMPLEX BUILDING SLABS AT OAK RIDGE NATIONAL LABORATORY, OAK RIDGE, TENNESSEE

    SciTech Connect (OSTI)

    Weaver, Phyllis C.

    2012-07-24

    Oak Ridge Associated Universities/Oak Ridge Institute for Science and Education (ORAU/ORISE) has completed the independent verification survey of the Central Campus and Southeast Lab Complex Building Slabs. The results of this effort are provided. The objective of this verification survey was to provide independent review and field assessment of remediation actions conducted by SEC, and to independently assess whether the final radiological condition of the slabs met the release guidelines.

  19. INTERIM REPORT--INDEPENDENT VERIFICATION SURVEY OF SECTION 3, SURVEY UNITS 1, 4 AND 5 EXCAVATED SURFACES, WHITTAKER CORPORATION, REYNOLDS INDUSTRIAL PARK, TRANSFER, PENNSYLVANIA DCN: 5002-SR-04-0"

    SciTech Connect (OSTI)

    ADAMS, WADE C

    2013-04-18

    At Pennsylvania Department of Environmental Protection's request, ORAU's IEAV program conducted verification surveys on the excavated surfaces of Section 3, SUs 1, 4, and 5 at the Whittaker site on March 13 and 14, 2013. The survey activities included visual inspections, gamma radiation surface scans, gamma activity measurements, and soil sampling activities. Verification activities also included the review and assessment of the licensee's project documentation and methodologies. Surface scans identified four areas of elevated direct gamma radiation distinguishable from background; one area within SUs 1 and 4 and two areas within SU5. One area within SU5 was remediated by removing a golf ball size piece of slag while ORAU staff was onsite. With the exception of the golf ball size piece of slag within SU5, a review of the ESL Section 3 EXS data packages for SUs 1, 4, and 5 indicated that these locations of elevated gamma radiation were also identified by the ESL gamma scans and that ESL personnel performed additional investigations and soil sampling within these areas. The investigative results indicated that the areas met the release criteria.

  20. INDEPENDENT VERIFICATION SURVEY REPORT FOR EXPOSURE UNITS Z2-24, Z2-31, Z2-32, AND Z2-36 IN ZONE 2 OF THE EAST TENNESSEE TECHNOLOGY PARK OAK RIDGE, TENNESSEE

    SciTech Connect (OSTI)

    2013-10-10

    The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management selected Oak Ridge Associated Universities (ORAU), through the Oak Ridge Institute for Science and Education (ORISE) contract, to perform independent verification (IV) at Zone 2 of the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. ORAU has concluded IV surveys, per the project-specific plan (PSP) (ORAU 2013a) covering exposure units (EUs) Z2-24, -31, -32, and -36. The objective of this effort was to verify the following. • Target EUs comply with requirements in the Zone 2 Record of Decision (ROD) (DOE 2005), as implemented by using the dynamic verification strategy presented in the dynamic work plan (DWP) (BJC 2007) • Commitments in the DWP were adequately implemented, as verified via IV surveys and soil sampling The Zone 2 ROD establishes maximum remediation level (RLmax) values and average RL (RLavg) values for the primary contaminants of concern (COCs) U-234, U-235, U-238, Cs-137, Np-237, Ra-226, Th-232, arsenic, mercury, and polychlorinated biphenyls (PCBs). Table 1.1 lists Zone 2 COCs with associated RLs. Additional radiological and chemical contaminants were also identified during past characterization and monitoring actions, though the ROD does not present RLs for these potential contaminants. IV activities focused on the identification and quantification of ROD-specific COCs in surface soils, but also generated data for other analytes to support future decisions. ORAU personnel also reviewed EU-specific phased construction completion reports (PCCRs) to focus IV activities and identify potential judgmental sample locations, if any.

  1. Systems analysis-independent analysis and verification

    SciTech Connect (OSTI)

    Badin, J.S.; DiPietro, J.P.

    1995-09-01

    The DOE Hydrogen Program is supporting research, development, and demonstration activities to overcome the barriers to the integration of hydrogen into the Nation`s energy infrastructure. Much work is required to gain acceptance of hydrogen energy system concepts and to develop them for implementation. A systems analysis database has been created that includes a formal documentation of technology characterization profiles and cost and performance information. Through a systematic and quantitative approach, system developers can understand and address important issues and thereby assure effective and timely commercial implementation. This project builds upon and expands the previously developed and tested pathway model and provides the basis for a consistent and objective analysis of all hydrogen energy concepts considered by the DOE Hydrogen Program Manager. This project can greatly accelerate the development of a system by minimizing the risk of costly design evolutions, and by stimulating discussions, feedback, and coordination of key players and allows them to assess the analysis, evaluate the trade-offs, and to address any emerging problem areas. Specific analytical studies will result in the validation of the competitive feasibility of the proposed system and identify system development needs. Systems that are investigated include hydrogen bromine electrolysis, municipal solid waste gasification, electro-farming (biomass gasifier and PEM fuel cell), wind/hydrogen hybrid system for remote sites, home electrolysis and alternate infrastructure options, renewable-based electrolysis to fuel PEM fuel cell vehicle fleet, and geothermal energy used to produce hydrogen. These systems are compared to conventional and benchmark technologies. Interim results and findings are presented. Independent analyses emphasize quality, integrity, objectivity, a long-term perspective, corporate memory, and the merging of technical, economic, operational, and programmatic expertise.

  2. SQA_CodeVerification_Survey_FINAL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Survey o f S oftware Q uality Assurance a nd Code Verification Practices i n CASL Michael P ernice Idaho N ational L aboratory Matt S ieger Oak R idge N ational Laboratory March 26, 2 013 INL/EXT-13-28675 CASL-U-2013-0079-000 CASL-U-2013-0079-000 DISCLAIMER This information was prepared as an account of work sponsored by an agency of the U.S. Government. Neither the U.S. Government nor any agency thereof, nor any of their employees, makes any warranty, expressed or implied, or assumes any legal

  3. Verification Survey of the Building 315 Zero Power Reactor-6 Facility, Argonne National Laboratory-East, Argonne, Illinois

    SciTech Connect (OSTI)

    W. C. Adams

    2007-05-25

    Oak Ridge Institute for Science and Education (ORISE) conducted independent verification radiological survey activities at Argonne National Laboratory’s Building 315, Zero Power Reactor-6 facility in Argonne, Illinois. Independent verification survey activities included document and data reviews, alpha plus beta and gamma surface scans, alpha and beta surface activity measurements, and instrumentation comparisons. An interim letter report and a draft report, documenting the verification survey findings, were submitted to the DOE on November 8, 2006 and February 22, 2007, respectively (ORISE 2006b and 2007).

  4. OPS 9.10 Independent Verification 8/24/98 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 Independent Verification 8/24/98 OPS 9.10 Independent Verification 8/24/98 The objective of this surveillance is to evaluate the conduct of selected independent verification activities. This surveillance provides a basis for evaluating the effectiveness of the contractor's independent verifications programs and for establishing compliance with DOE requirements. OPS9-10.doc (35.5 KB) More Documents & Publications OPS 9.2 Shift Routines and Operating Practices 8/24/98 OPS 9.12 Operations

  5. Survey of Existing Tools for Formal Verification.

    SciTech Connect (OSTI)

    Punnoose, Ratish J.; Armstrong, Robert C.; Wong, Matthew H.; Jackson, Mayo

    2014-12-01

    Formal methods have come into wide use because of their effectiveness in verifying %22safety and security%22 requirements of digital systems; a set of requirements for which testing is mostly ineffective. Formal methods are routinely used in the design and verification of high-consequence digital systems in industry. This report outlines our work in assessing the capabilities of commercial and open source formal tools and the ways in which they can be leveraged in digital design workflows.

  6. "What's New with Independent Verification at Department of Energy Sites" |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy "What's New with Independent Verification at Department of Energy Sites" "What's New with Independent Verification at Department of Energy Sites" Sarah Roberts*, Oak Ridge Associated Universities ; Edward Regnier, U.S. Department of Energy; Tim Vitkus, Oak Ridge Associated Universities; Alexander Williams, U.S. Department of Energy Abstract: Recent rulemaking by the U.S. Department of Energy (DOE) has formalized the requirements for independent

  7. VERIFICATION SURVEY OF THE BAKER AND WILLIAMS WAREHOUSES

    Office of Legacy Management (LM)

    ~ *-,-' .r_~, VERIFICATION SURVEY OF THE BAKER AND WILLIAMS WAREHOUSES BUILDING 513-519 NEW YORK, NEW YORK Prepared by W. C. Adams Environmental Survey and Site Assessment Program Energy/Environment Systems Division Oak Ridge Institute for Science and Education Oak Ridge, Tennessee 37831-0117 Prepared for the Office of Environmental Restoration U.S. Department of Energy FINAL REPORT JUNE 1994 This report is based on work performed under contract number DE-AC05-760R00033 with the U.S. Department

  8. The independent verification process in decommissioning, decontamination, and reutilization activities - description, benefits, and lessons learned

    SciTech Connect (OSTI)

    Egidi, P.V.

    1997-06-01

    Oak Ridge National Laboratory Environmental Technology Section has been performing Independent Verification (IV) activities for U.S. DOE sites since 1986. DOE has successfully used IV in the Uranium Mill Tailings Remedial Action Program, Decontamination and Decommissioning projects, and Formerly Utilized Sites Remedial Action Projects/Surplus Facilities Management Program. Projects that have undergone IV range from small residential properties to large, industrial sites. The IV process provides a third-party review conducted by an independent organization. The purpose is to verify accuracy and completeness of contractor field measurements and final documentation, evaluate the credibility of procedures, and independently assess post-cleanup conditions versus decommissioning project plans and release criteria. Document reviews of plans, dose models, procedures, and reports are some IV activities undertaken. Independent measurements are also collected during field visits to confirm the contractor`s findings. Corrective actions for discrepancies are suggested if necessary. Finally, archival and reporting of the final site environmental conditions for project closeout and certification are completed. The IV contractor reports to DOE headquarters and acts as a quality assurance feedback mechanism. An IV also provides additional assurance that projects are planned, carried out, and documented properly. Decommissioning projects benefit from the IV process by: (1) cost and time savings from early identification of potential problems, (2) assurance that cleanup meets regulatory guidelines, and (3) technical reviews and consultation with experts in field instrumentation, sampling strategy, etc. Some lessons learned from the IV process include avoiding: (1) improper survey techniques, (2) reporting data in units not comparable with guideline values, (3) premature release of surfaces, (4) poor decommissioning project planning, (5) misapplication of release guidelines. 20 refs.

  9. LETTER REPORT INDEPENDENT VERIFICATION OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT FAN HOUSE, BUILDING 704 BNL

    SciTech Connect (OSTI)

    P.C. Weaver

    2010-10-22

    5098-LR-01-0 -LETTER REPORT INDEPENDENT VERIFICATION OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT FAN HOUSE, BUILDING 704 BROOKHAVEN NATIONAL LABORATORY

  10. Verification survey report of the south waste tank farm training/test tower and hazardous waste storage lockers at the West Valley demonstration project, West Valley, New York

    SciTech Connect (OSTI)

    Weaver, Phyllis C.

    2012-08-29

    A team from ORAU's Independent Environmental Assessment and Verification Program performed verification survey activities on the South Test Tower and four Hazardous Waste Storage Lockers. Scan data collected by ORAU determined that both the alpha and alpha-plus-beta activity was representative of radiological background conditions. The count rate distribution showed no outliers that would be indicative of alpha or alpha-plus-beta count rates in excess of background. It is the opinion of ORAU that independent verification data collected support the site?s conclusions that the South Tower and Lockers sufficiently meet the site criteria for release to recycle and reuse.

  11. Cosmic shear measurements with Dark Energy Survey Science Verification data

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Becker, M. R.

    2016-07-06

    Here, we present measurements of weak gravitational lensing cosmic shear two-point statistics using Dark Energy Survey Science Verification data. We demonstrate that our results are robust to the choice of shear measurement pipeline, either ngmix or im3shape, and robust to the choice of two-point statistic, including both real and Fourier-space statistics. Our results pass a suite of null tests including tests for B-mode contamination and direct tests for any dependence of the two-point functions on a set of 16 observing conditions and galaxy properties, such as seeing, airmass, galaxy color, galaxy magnitude, etc. We use a large suite of simulationsmore » to compute the covariance matrix of the cosmic shear measurements and assign statistical significance to our null tests. We find that our covariance matrix is consistent with the halo model prediction, indicating that it has the appropriate level of halo sample variance. We also compare the same jackknife procedure applied to the data and the simulations in order to search for additional sources of noise not captured by the simulations. We find no statistically significant extra sources of noise in the data. The overall detection significance with tomography for our highest source density catalog is 9.7σ. Cosmological constraints from the measurements in this work are presented in a companion paper (DES et al. 2015).« less

  12. A method for online verification of adapted fields using an independent dose monitor

    SciTech Connect (OSTI)

    Chang Jina; Norrlinger, Bernhard D.; Heaton, Robert K.; Jaffray, David A.; Cho, Young-Bin; Islam, Mohammad K.; Mahon, Robert

    2013-07-15

    Purpose: Clinical implementation of online adaptive radiotherapy requires generation of modified fields and a method of dosimetric verification in a short time. We present a method of treatment field modification to account for patient setup error, and an online method of verification using an independent monitoring system.Methods: The fields are modified by translating each multileaf collimator (MLC) defined aperture in the direction of the patient setup error, and magnifying to account for distance variation to the marked isocentre. A modified version of a previously reported online beam monitoring system, the integral quality monitoring (IQM) system, was investigated for validation of adapted fields. The system consists of a large area ion-chamber with a spatial gradient in electrode separation to provide a spatially sensitive signal for each beam segment, mounted below the MLC, and a calculation algorithm to predict the signal. IMRT plans of ten prostate patients have been modified in response to six randomly chosen setup errors in three orthogonal directions.Results: A total of approximately 49 beams for the modified fields were verified by the IQM system, of which 97% of measured IQM signal agree with the predicted value to within 2%.Conclusions: The modified IQM system was found to be suitable for online verification of adapted treatment fields.

  13. Independent Verification and Validation Of SAPHIRE 8 System Test Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-02-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE System Test Plan is to assess the approach to be taken for intended testing activities associated with the SAPHIRE software product. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

  14. Independent Verification and Validation Of SAPHIRE 8 Software Requirements Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-03-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE requirements definition is to assess the activities that results in the specification, documentation, and review of the requirements that the software product must satisfy, including functionality, performance, design constraints, attributes and external interfaces. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production. IV&V reviewed the requirements specified in the NRC Form 189s to verify these requirements were included in SAPHIRE’s Software Verification and Validation Plan (SVVP).

  15. Independent Verification and Validation Of SAPHIRE 8 Software Requirements Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2009-09-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE requirements definition is to assess the activities that results in the specification, documentation, and review of the requirements that the software product must satisfy, including functionality, performance, design constraints, attributes and external interfaces. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production. IV&V reviewed the requirements specified in the NRC Form 189s to verify these requirements were included in SAPHIRE’s Software Verification and Validation Plan (SVVP).

  16. Independent verification of plutonium decontamination on Johnston Atoll (1992--1996)

    SciTech Connect (OSTI)

    Wilson-Nichols, M.J.; Wilson, J.E.; McDowell-Boyer, L.M.; Davidson, J.R.; Egidi, P.V.; Coleman, R.L.

    1998-05-01

    The Field Command, Defense Special Weapons Agency (FCDSWA) (formerly FCDNA) contracted Oak Ridge National Laboratory (ORNL) Environmental Technology Section (ETS) to conduct an independent verification (IV) of the Johnston Atoll (JA) Plutonium Decontamination Project by an interagency agreement with the US Department of Energy in 1992. The main island is contaminated with the transuranic elements plutonium and americium, and soil decontamination activities have been ongoing since 1984. FCDSWA has selected a remedy that employs a system of sorting contaminated particles from the coral/soil matrix, allowing uncontaminated soil to be reused. The objective of IV is to evaluate the effectiveness of remedial action. The IV contractor`s task is to determine whether the remedial action contractor has effectively reduced contamination to levels within established criteria and whether the supporting documentation describing the remedial action is adequate. ORNL conducted four interrelated tasks from 1992 through 1996 to accomplish the IV mission. This document is a compilation and summary of those activities, in addition to a comprehensive review of the history of the project.

  17. US-VISIT Independent Verification and Validation Project: Test Bed Establishment Report

    SciTech Connect (OSTI)

    Jensen, N W; Gansemer, J D

    2011-01-21

    This document describes the computational and data systems available at the Lawrence Livermore National Laboratory for use on the US-VISIT Independent Verification and Validation (IV&V) project. This system - composed of data, software and hardware - is designed to be as close as a representation of the operational ADIS system as is required to verify and validate US-VISIT methodologies. It is not required to reproduce the computational capabilities of the enterprise-class operational system. During FY10, the test bed was simplified from the FY09 version by reducing the number of database host computers from three to one, significantly reducing the maintenance and overhead while simultaneously increasing system throughput. During the current performance period, a database transfer was performed as a set of Data Pump Export files. The previous RMAN backup from 2007 required the availability of an AIX system which is not required when using data pump. Due to efficiencies in the new system and process, loading of the database refresh was able to be accomplished in a much shorter time frame than was previously required. The FY10 Oracle Test Bed now consists of a single Linux platform hosting two Oracle databases including the 2007 copy as well as the October 2010 refresh.

  18. Final Report - Independent Confirmatory Survey Summary and Results for the Hematite Decommissioning Project

    SciTech Connect (OSTI)

    E.N. Bailey

    2009-03-18

    The objectives of the confirmatory surveys were to provide independent contractor field data reviews and to generate independent radiological data for use by the NRC in evaluating the adequacy and accuracy of the licensee’s procedures and survey results.

  19. Interim Letter Report - Verification Survey of 19 Grids in the Lester Flat Area, David Witherspoon Inc. 1630 Site Knoxville, Tennessee

    SciTech Connect (OSTI)

    P.C. Weaver

    2008-10-17

    Perform verification surveys of 19 available grids located in the Lester Flat Area at the Davod Witherspoon Site. The survey grids included E11, E12, E13, F11, F12, F13, F14, F15, G15, G16, G17, H16, H17, H18, X16, X17, X18, K16, and J16.

  20. 2012 Independent Communication and Outreach Stakeholder Satisfaction Survey

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE-LM periodically surveys its stakeholders to collect their feedback on DOE-LM performance at both a local and national level. The first customer satisfaction survey was conducted in 2005 and...

  1. Independent Confirmatory Survey Summary and Results for the Plum Brook Reactor Facility Sandusky OH

    SciTech Connect (OSTI)

    E.N. Bailey

    2008-05-06

    The objectives of the confirmatory survey activities were to provide independent contractor field data reviews and to generate independent radiological data for use by the Nuclear Regulatory Commission (NRC) in evaluating the adequacy and accuracy of the licensee’s procedures and final status survey (FSS) results.

  2. Independent Verification and Validation Of SAPHIRE 8 Software Design and Interface Design Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-03-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE software design and interface design is to assess the activities that results in the development, documentation, and review of a software design that meets the requirements defined in the software requirements documentation. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production. IV&V reviewed the requirements specified in the NRC Form 189s to verify these requirements were included in SAPHIRE’s Software Verification and Validation Plan (SVVP) design specification.

  3. Independent Verification and Validation Of SAPHIRE 8 Software Design and Interface Design Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2009-10-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE software design and interface design is to assess the activities that results in the development, documentation, and review of a software design that meets the requirements defined in the software requirements documentation. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production. IV&V reviewed the requirements specified in the NRC Form 189s to verify these requirements were included in SAPHIRE’s Software Verification and Validation Plan (SVVP) design specification.

  4. Mass and galaxy distributions of four massive galaxy clusters from Dark Energy Survey Science Verification data

    SciTech Connect (OSTI)

    Melchior, P.; et al.

    2015-05-21

    We measure the weak-lensing masses and galaxy distributions of four massive galaxy clusters observed during the Science Verification phase of the Dark Energy Survey. This pathfinder study is meant to 1) validate the DECam imager for the task of measuring weak-lensing shapes, and 2) utilize DECam's large field of view to map out the clusters and their environments over 90 arcmin. We conduct a series of rigorous tests on astrometry, photometry, image quality, PSF modeling, and shear measurement accuracy to single out flaws in the data and also to identify the optimal data processing steps and parameters. We find Science Verification data from DECam to be suitable for the lensing analysis described in this paper. The PSF is generally well-behaved, but the modeling is rendered difficult by a flux-dependent PSF width and ellipticity. We employ photometric redshifts to distinguish between foreground and background galaxies, and a red-sequence cluster finder to provide cluster richness estimates and cluster-galaxy distributions. By fitting NFW profiles to the clusters in this study, we determine weak-lensing masses that are in agreement with previous work. For Abell 3261, we provide the first estimates of redshift, weak-lensing mass, and richness. In addition, the cluster-galaxy distributions indicate the presence of filamentary structures attached to 1E 0657-56 and RXC J2248.7-4431, stretching out as far as 1 degree (approximately 20 Mpc), showcasing the potential of DECam and DES for detailed studies of degree-scale features on the sky.

  5. Mass and galaxy distributions of four massive galaxy clusters from Dark Energy Survey Science Verification data

    SciTech Connect (OSTI)

    Melchior, P.; Suchyta, E.; Huff, E.; Hirsch, M.; Kacprzak, T.; Rykoff, E.; Gruen, D.; Armstrong, R.; Bacon, D.; Bechtol, K.; Bernstein, G. M.; Bridle, S.; Clampitt, J.; Honscheid, K.; Jain, B.; Jouvel, S.; Krause, E.; Lin, H.; MacCrann, N.; Patton, K.; Plazas, A.; Rowe, B.; Vikram, V.; Wilcox, H.; Young, J.; Zuntz, J.; Abbott, T.; Abdalla, F. B.; Allam, S. S.; Banerji, M.; Bernstein, J. P.; Bernstein, R. A.; Bertin, E.; Buckley-Geer, E.; Burke, D. L.; Castander, F. J.; da Costa, L. N.; Cunha, C. E.; Depoy, D. L.; Desai, S.; Diehl, H. T.; Doel, P.; Estrada, J.; Evrard, A. E.; Neto, A. F.; Fernandez, E.; Finley, D. A.; Flaugher, B.; Frieman, J. A.; Gaztanaga, E.; Gerdes, D.; Gruendl, R. A.; Gutierrez, G. R.; Jarvis, M.; Karliner, I.; Kent, S.; Kuehn, K.; Kuropatkin, N.; Lahav, O.; Maia, M. A. G.; Makler, M.; Marriner, J.; Marshall, J. L.; Merritt, K. W.; Miller, C. J.; Miquel, R.; Mohr, J.; Neilsen, E.; Nichol, R. C.; Nord, B. D.; Reil, K.; Roe, N. A.; Roodman, A.; Sako, M.; Sanchez, E.; Santiago, B. X.; Schindler, R.; Schubnell, M.; Sevilla-Noarbe, I.; Sheldon, E.; Smith, C.; Soares-Santos, M.; Swanson, M. E. C.; Sypniewski, A. J.; Tarle, G.; Thaler, J.; Thomas, D.; Tucker, D. L.; Walker, A.; Wechsler, R.; Weller, J.; Wester, W.

    2015-03-31

    We measure the weak-lensing masses and galaxy distributions of four massive galaxy clusters observed during the Science Verification phase of the Dark Energy Survey. This pathfinder study is meant to 1) validate the DECam imager for the task of measuring weak-lensing shapes, and 2) utilize DECam's large field of view to map out the clusters and their environments over 90 arcmin. We conduct a series of rigorous tests on astrometry, photometry, image quality, PSF modelling, and shear measurement accuracy to single out flaws in the data and also to identify the optimal data processing steps and parameters. We find Science Verification data from DECam to be suitable for the lensing analysis described in this paper. The PSF is generally well-behaved, but the modelling is rendered difficult by a flux-dependent PSF width and ellipticity. We employ photometric redshifts to distinguish between foreground and background galaxies, and a red-sequence cluster finder to provide cluster richness estimates and cluster-galaxy distributions. By fitting NFW profiles to the clusters in this study, we determine weak-lensing masses that are in agreement with previous work. For Abell 3261, we provide the first estimates of redshift, weak-lensing mass, and richness. Additionally, the cluster-galaxy distributions indicate the presence of filamentary structures attached to 1E 0657-56 and RXC J2248.7-4431, stretching out as far as 1degree (approximately 20 Mpc), showcasing the potential of DECam and DES for detailed studies of degree-scale features on the sky.

  6. Mass and galaxy distributions of four massive galaxy clusters from Dark Energy Survey Science Verification data

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Melchior, P.; Suchyta, E.; Huff, E.; Hirsch, M.; Kacprzak, T.; Rykoff, E.; Gruen, D.; Armstrong, R.; Bacon, D.; Bechtol, K.; et al

    2015-03-31

    We measure the weak-lensing masses and galaxy distributions of four massive galaxy clusters observed during the Science Verification phase of the Dark Energy Survey. This pathfinder study is meant to 1) validate the DECam imager for the task of measuring weak-lensing shapes, and 2) utilize DECam's large field of view to map out the clusters and their environments over 90 arcmin. We conduct a series of rigorous tests on astrometry, photometry, image quality, PSF modelling, and shear measurement accuracy to single out flaws in the data and also to identify the optimal data processing steps and parameters. We find Sciencemore » Verification data from DECam to be suitable for the lensing analysis described in this paper. The PSF is generally well-behaved, but the modelling is rendered difficult by a flux-dependent PSF width and ellipticity. We employ photometric redshifts to distinguish between foreground and background galaxies, and a red-sequence cluster finder to provide cluster richness estimates and cluster-galaxy distributions. By fitting NFW profiles to the clusters in this study, we determine weak-lensing masses that are in agreement with previous work. For Abell 3261, we provide the first estimates of redshift, weak-lensing mass, and richness. Additionally, the cluster-galaxy distributions indicate the presence of filamentary structures attached to 1E 0657-56 and RXC J2248.7-4431, stretching out as far as 1degree (approximately 20 Mpc), showcasing the potential of DECam and DES for detailed studies of degree-scale features on the sky.« less

  7. Wide-Field Lensing Mass Maps from Dark Energy Survey Science Verification Data

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Chang, C.

    2015-07-29

    We present a mass map reconstructed from weak gravitational lensing shear measurements over 139 deg2 from the Dark Energy Survey science verification data. The mass map probes both luminous and dark matter, thus providing a tool for studying cosmology. We also find good agreement between the mass map and the distribution of massive galaxy clusters identified using a red-sequence cluster finder. Potential candidates for superclusters and voids are identified using these maps. We measure the cross-correlation between the mass map and a magnitude-limited foreground galaxy sample and find a detection at the 6.8σ level with 20 arc min smoothing. Thesemore » measurements are consistent with simulated galaxy catalogs based on N-body simulations from a cold dark matter model with a cosmological constant. This suggests low systematics uncertainties in the map. Finally, we summarize our key findings in this Letter; the detailed methodology and tests for systematics are presented in a companion paper.« less

  8. Wide-Field Lensing Mass Maps from Dark Energy Survey Science Verification Data

    SciTech Connect (OSTI)

    Chang, C.

    2015-07-29

    We present a mass map reconstructed from weak gravitational lensing shear measurements over 139 deg2 from the Dark Energy Survey science verification data. The mass map probes both luminous and dark matter, thus providing a tool for studying cosmology. We also find good agreement between the mass map and the distribution of massive galaxy clusters identified using a red-sequence cluster finder. Potential candidates for superclusters and voids are identified using these maps. We measure the cross-correlation between the mass map and a magnitude-limited foreground galaxy sample and find a detection at the 6.8σ level with 20 arc min smoothing. These measurements are consistent with simulated galaxy catalogs based on N-body simulations from a cold dark matter model with a cosmological constant. This suggests low systematics uncertainties in the map. Finally, we summarize our key findings in this Letter; the detailed methodology and tests for systematics are presented in a companion paper.

  9. Independent Verification and Validation Of SAPHIRE 8 Volume 3 Users' Guide Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-03-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE 8 Volume 3 Users’ Guide is to assess the user documentation for its completeness, correctness, and consistency with respect to requirements for user interface and for any functionality that can be invoked by the user. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

  10. Final Report - Independent Verification Survey Activities at the Seperations Process Research Unit Sites, Niskayuna, New York

    SciTech Connect (OSTI)

    Evan Harpenau

    2011-03-15

    The Separations Process Research Unit (SPRU) complex located on the Knolls Atomic Power Laboratory (KAPL) site in Niskayuna, New York, was constructed in the late 1940s to research the chemical separation of plutonium and uranium (Figure A-1). SPRU operated as a laboratory scale research facility between February 1950 and October 1953. The research activities ceased following the successful development of the reduction oxidation and plutonium/uranium extraction processes. The oxidation and extraction processes were subsequently developed for large scale use by the Hanford and Savannah River sites (aRc 2008a). Decommissioning of the SPRU facilities began in October 1953 and continued through the 1990s.

  11. Guidelines for the verification and validation of expert system software and conventional software: Survey and documentation of expert system verification and validation methodologies. Volume 3

    SciTech Connect (OSTI)

    Groundwater, E.H.; Miller, L.A.; Mirsky, S.M.

    1995-03-01

    This report is the third volume in the final report for the Expert System Verification and Validation (V&V) project which was jointly sponsored by the Nuclear Regulatory Commission and the Electric Power Research Institute. The ultimate objective is the formulation of guidelines for the V&V of expert systems for use in nuclear power applications. The purpose of this activity was to survey and document techniques presently in use for expert system V&V. The survey effort included an extensive telephone interviewing program, site visits, and a thorough bibliographic search and compilation. The major finding was that V&V of expert systems is not nearly as established or prevalent as V&V of conventional software systems. When V&V was used for expert systems, it was almost always at the system validation stage after full implementation and integration usually employing the non-systematic dynamic method of {open_quotes}ad hoc testing.{close_quotes} There were few examples of employing V&V in the early phases of development and only weak sporadic mention of the possibilities in the literature. There is, however, a very active research area concerning the development of methods and tools to detect problems with, particularly, rule-based expert systems. Four such static-testing methods were identified which were not discovered in a comprehensive review of conventional V&V methods in an earlier task.

  12. Independent Verification and Validation Of SAPHIRE 8 Software Configuration Management Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-02-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE configuration management is to assess the activities that results in the process of identifying and defining the baselines associated with the SAPHIRE software product; controlling the changes to baselines and release of baselines throughout the life cycle; recording and reporting the status of baselines and the proposed and actual changes to the baselines; and verifying the correctness and completeness of baselines.. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

  13. Independent Verification and Validation Of SAPHIRE 8 Software Acceptance Test Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-03-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE 8 Software Acceptance Test Plan is to assess the approach to be taken for intended testing activities. The plan typically identifies the items to be tested, the requirements being tested, the testing to be performed, test schedules, personnel requirements, reporting requirements, evaluation criteria, and any risks requiring contingency planning. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

  14. Independent Verification and Validation Of SAPHIRE 8 Software Configuration Management Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2009-10-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE configuration management is to assess the activities that results in the process of identifying and defining the baselines associated with the SAPHIRE software product; controlling the changes to baselines and release of baselines throughout the life cycle; recording and reporting the status of baselines and the proposed and actual changes to the baselines; and verifying the correctness and completeness of baselines.. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

  15. Neutronic, steady-state, and transient analyses for the Kazakhstan VVR-K reactor with LEU fuel: ANL independent verification results

    SciTech Connect (OSTI)

    Hanan, Nelson A.; Garner, Patrick L.

    2015-08-01

    Calculations have been performed for steady state and postulated transients in the VVR-K reactor at the Institute of Nuclear Physics (INP), Kazakhstan. (The reactor designation in Cyrillic is BBP-K; transliterating characters to English gives VVR-K but translating words gives WWR-K.) These calculations have been performed at the request of staff of the INP who are performing similar calculations. The selection of the transients considered started during working meetings and email correspondence between Argonne National Laboratory (ANL) and INP staff. In the end the transient were defined by the INP staff. Calculations were performed for the fresh low-enriched uranium (LEU) core and for four subsequent cores as beryllium is added to maintain critically during the first 15 cycles. These calculations have been performed independently from those being performed by INP and serve as one step in the verification process.

  16. Wide-field lensing mass maps from Dark Energy Survey science verification data: Methodology and detailed analysis

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Vikram, V.

    2015-07-29

    Weak gravitational lensing allows one to reconstruct the spatial distribution of the projected mass density across the sky. These “mass maps” provide a powerful tool for studying cosmology as they probe both luminous and dark matter. In this paper, we present a weak lensing mass map reconstructed from shear measurements in a 139 deg2 area from the Dark Energy Survey (DES) science verification data. We compare the distribution of mass with that of the foreground distribution of galaxies and clusters. The overdensities in the reconstructed map correlate well with the distribution of optically detected clusters. We demonstrate that candidate superclustersmore » and voids along the line of sight can be identified, exploiting the tight scatter of the cluster photometric redshifts. We cross-correlate the mass map with a foreground magnitude-limited galaxy sample from the same data. Our measurement gives results consistent with mock catalogs from N-body simulations that include the primary sources of statistical uncertainties in the galaxy, lensing, and photo-z catalogs. The statistical significance of the cross-correlation is at the 6.8σ level with 20 arcminute smoothing. We find that the contribution of systematics to the lensing mass maps is generally within measurement uncertainties. In this study, we analyze less than 3% of the final area that will be mapped by the DES; the tools and analysis techniques developed in this paper can be applied to forthcoming larger data sets from the survey.« less

  17. Wide-field lensing mass maps from Dark Energy Survey science verification data: Methodology and detailed analysis

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Vikram, V.; Sheldon, E.; Chang, C.; Jain, B.; Bacon, D.; Amara, A.; Becker, M. R.; Bernstein, G.; Bonnett, C.; Bridle, S.; et al

    2015-07-29

    Weak gravitational lensing allows one to reconstruct the spatial distribution of the projected mass density across the sky. These mass maps provide a powerful tool for studying cosmology as they probe both luminous and dark matter. In this paper, we present a weak lensing mass map reconstructed from shear measurements in a 139 deg2 area from the Dark Energy Survey science verification data. We compare the distribution of mass with that of the foreground distribution of galaxies and clusters. The overdensities in the reconstructed map correlate well with the distribution of optically detected clusters. We demonstrate that candidate superclusters andmorevoids along the line of sight can be identified, exploiting the tight scatter of the cluster photometric redshifts. We cross-correlate the mass map with a foreground magnitude-limited galaxy sample from the same data. Our measurement gives results consistent with mock catalogs from N-body simulations that include the primary sources of statistical uncertainties in the galaxy, lensing, and photo-z catalogs. The statistical significance of the cross-correlation is at the 6.8? level with 20 arcminute smoothing. We find that the contribution of systematics to the lensing mass maps is generally within measurement uncertainties. We analyze less than 3% of the final area that will be mapped by the DES; the tools and analysis techniques developed in this paper can be applied to forthcoming larger data sets from the survey.less

  18. Wide-field lensing mass maps from Dark Energy Survey science verification data: Methodology and detailed analysis

    SciTech Connect (OSTI)

    Vikram, V.; Sheldon, E.; Chang, C.; Jain, B.; Bacon, D.; Amara, A.; Becker, M. R.; Bernstein, G.; Bonnett, C.; Bridle, S.; Brout, D.; Busha, M.; Frieman, J.; Gaztanaga, E.; Hartley, W.; Jarvis, M.; Kacprzak, T.; Kovacs, A.; Lahav, O.; Leistedt, B.; Lin, H.; Melchior, P.; Peiris, H.; Rozo, E.; Rykoff, E.; Sanchez, C.; Sheldon, E.; Troxel, M. A.; Wechsler, R.; Zuntz, J.; Abbott, T.; Abdalla, F. B.; Armstrong, R.; Banerji, M.; Bauer, A. H.; Benoit-Levy, A.; Bertin, E.; Brooks, D.; Buckley-Geer, E.; Burke, D. L.; Capozzi, D.; Carnero Rosell, A.; Kind, M. Carrasco; Castander, F. J.; Crocce, M.; Cunha, C. E.

    2015-07-29

    Weak gravitational lensing allows one to reconstruct the spatial distribution of the projected mass density across the sky. These mass maps provide a powerful tool for studying cosmology as they probe both luminous and dark matter. In this paper, we present a weak lensing mass map reconstructed from shear measurements in a 139 deg2 area from the Dark Energy Survey science verification data. We compare the distribution of mass with that of the foreground distribution of galaxies and clusters. The overdensities in the reconstructed map correlate well with the distribution of optically detected clusters. We demonstrate that candidate superclusters and voids along the line of sight can be identified, exploiting the tight scatter of the cluster photometric redshifts. We cross-correlate the mass map with a foreground magnitude-limited galaxy sample from the same data. Our measurement gives results consistent with mock catalogs from N-body simulations that include the primary sources of statistical uncertainties in the galaxy, lensing, and photo-z catalogs. The statistical significance of the cross-correlation is at the 6.8? level with 20 arcminute smoothing. We find that the contribution of systematics to the lensing mass maps is generally within measurement uncertainties. We analyze less than 3% of the final area that will be mapped by the DES; the tools and analysis techniques developed in this paper can be applied to forthcoming larger data sets from the survey.

  19. Wide-field lensing mass maps from Dark Energy Survey science verification data: Methodology and detailed analysis

    SciTech Connect (OSTI)

    Vikram, V.

    2015-07-29

    Weak gravitational lensing allows one to reconstruct the spatial distribution of the projected mass density across the sky. These mass maps provide a powerful tool for studying cosmology as they probe both luminous and dark matter. In this paper, we present a weak lensing mass map reconstructed from shear measurements in a 139 deg2 area from the Dark Energy Survey (DES) science verification data. We compare the distribution of mass with that of the foreground distribution of galaxies and clusters. The overdensities in the reconstructed map correlate well with the distribution of optically detected clusters. We demonstrate that candidate superclusters and voids along the line of sight can be identified, exploiting the tight scatter of the cluster photometric redshifts. We cross-correlate the mass map with a foreground magnitude-limited galaxy sample from the same data. Our measurement gives results consistent with mock catalogs from N-body simulations that include the primary sources of statistical uncertainties in the galaxy, lensing, and photo-z catalogs. The statistical significance of the cross-correlation is at the 6.8? level with 20 arcminute smoothing. We find that the contribution of systematics to the lensing mass maps is generally within measurement uncertainties. In this study, we analyze less than 3% of the final area that will be mapped by the DES; the tools and analysis techniques developed in this paper can be applied to forthcoming larger data sets from the survey.

  20. INDEPENDENT CONFIRMATORY SURVEY OF THE NUCLEAR RESEARCH LABORATORY AT THE UNIVERSITY OF ILLINOIS URBANA-CHAMPAIGN, ILLINOIS

    SciTech Connect (OSTI)

    EVAN M. HARPENAU

    2012-06-28

    ORAU conducted confirmatory survey activities within the NRL at the University during the week of May 7, 2012. The survey activities included visual inspections/ assessments, surface activity measurements, and volumetric concrete sampling activities. During the course of the confirmatory activities, ORAU noted several issues with the survey-for-release activities performed at the University. Issues included inconsistencies with: survey unit classifications were not designated according to Multi-Agency Radiation Survey and Site Investigation Manual guidance; survey instrument calibrations were not representative of the radionuclides of concern; calculations for instrumentation detection capabilities did not align with the release criteria discussed in the licensee’s survey guidance documents; total surface activity measurements were in excess of the release criteria; and Co-60 and Eu-152 concentrations in the confirmatory concrete samples were above their respective guidelines. Based on the significant programmatic issues identified, ORAU cannot independently conclude that the NRL satisfied the requirements and limits for release of materials without radiological restrictions.

  1. Neutronics, steady-state, and transient analyses for the Poland MARIA reactor for irradiation testing of LEU lead test fuel assemblies from CERCA : ANL independent verification results.

    SciTech Connect (OSTI)

    Garner, P. L.; Hanan, N. A.

    2011-06-07

    The MARIA reactor at the Institute of Atomic Energy (IAE) in Swierk (30 km SE of Warsaw) in the Republic of Poland is considering conversion from high-enriched uranium (HEU) to low-enriched uranium (LEU) fuel assemblies (FA). The FA design in MARIA is rather unique; a suitable LEU FA has never been designed or tested. IAE has contracted with CERCA (the fuel supply portion of AREVA in France) to supply 2 lead test assemblies (LTA). The LTAs will be irradiated in MARIA to burnup level of at least 40% for both LTAs and to 60% for one LTA. IAE may decide to purchase additional LEU FAs for a full core conversion after the test irradiation. The Reactor Safety Committee within IAE and the National Atomic Energy Agency in Poland (PAA) must approve the LTA irradiation process. The approval will be based, in part, on IAE submitting revisions to portions of the Safety Analysis Report (SAR) which are affected by the insertion of the LTAs. (A similar process will be required for the full core conversion to LEU fuel.) The analysis required was established during working meetings between Argonne National Laboratory (ANL) and IAE staff during August 2006, subsequent email correspondence, and subsequent staff visits. The analysis needs to consider the current high-enriched uranium (HEU) core and 4 core configurations containing 1 and 2 LEU LTAs in various core positions. Calculations have been performed at ANL in support of the LTA irradiation. These calculations are summarized in this report and include criticality, burn-up, neutronics parameters, steady-state thermal hydraulics, and postulated transients. These calculations have been performed at the request of the IAE staff, who are performing similar calculations to be used in their SAR amendment submittal to the PAA. The ANL analysis has been performed independently from that being performed by IAE and should only be used as one step in the verification process.

  2. "INDEPENDENT CONFIRMATORY SURVEY SUMMARY AND RESULTS FOR THE FORD NUCLEAR REACTOR, REVISION 1, ANN ARBOR, MICHIGAN

    SciTech Connect (OSTI)

    ALTIC, NICK A

    2013-08-01

    At the NRC?s request, ORAU conducted confirmatory surveys of the FNR during the period of December 4 through 6, 2012. The survey activities included visual inspections and measurement and sampling activities. Confirmatory activities also included the review and assessment of UM?s project documentation and methodologies. Surface scans identified elevated activity in two areas. The first area was on a wall outside of Room 3103 and the second area was in the southwest section on the first floor. The first area was remediated to background levels. However, the second area was due to gamma shine from a neighboring source storage area. A retrospective analysis of UM?s FSS data shows that for the SUs investigated by the ORAU survey team, UM met the survey requirements set forth in the FSSP. The total mean surface activity values were directly compared with the mean total surface activity reported by UM. Mean surface activity values determined by UM were within two standard deviations of the mean determined by ORAU. Additionally, all surface activity values were less than the corresponding gross beta DCGL{sub W}. Laboratory analysis of the soil showed that COC concentrations were less than the respective DCGL{sub W} values. For the inter-lab comparison, the DER was above 3 for only one sample. However, since the sum of fractions for each of the soil samples was below 1, thus none of the samples would fail to meet release guidelines. Based on the findings of the side-by-side direct measurements, and after discussion with the NRC and ORAU, UM decided to use a more appropriate source efficiency in their direct measurement calculations and changed their source efficiency from 0.37 to 0.25.

  3. INDEPENDENT CONFIRMATORY SURVEY SUMMARY AND RESULTS FOR THE FORD NUCLEAR REACTOR, ANN ARBOR, MICHIGAN

    SciTech Connect (OSTI)

    ALTIC, NICK A

    2013-07-25

    At the NRC?s request, ORAU conducted confirmatory surveys of the FNR during the period of December 4 through 6, 2012. The survey activities included visual inspections and measurement and sampling activities. Confirmatory activities also included the review and assessment of UM?s project documentation and methodologies. Surface scans identified elevated activity in two areas. The first area was on a wall outside of Room 3103 and the second area was in the southwest section on the first floor. The first area was remediated to background levels. However, the second area was due to gamma shine from a neighboring source storage area. A retrospective analysis of UM?s FSS data shows that for the SUs investigated by the ORAU survey team, UM met the survey requirements set forth in the FSSP. The total mean surface activity values were directly compared with the mean total surface activity reported by UM. Mean surface activity values determined by UM were within two standard deviations of the mean determined by ORAU. Additionally, all surface activity values were less than the corresponding gross beta DCGLW. Laboratory analysis of the soil showed that COC concentrations were less than the respective DCGLW values. For the inter-lab comparison, the DER was above 3 for only one sample. However, since the sum of fractions for each of the soil samples was below 1, thus none of the samples would fail to meet release guidelines. Based on the findings of the side-by-side direct measurements, and after discussion with the NRC and ORAU, UM decided to use a more appropriate source efficiency in their direct measurement calculations and changed their source efficiency from 0.37 to 0.25.

  4. FINAL REPORT FOR INDEPENDENT CONFIRMATORY SURVEY SUMMARY AND RESULTS FOR THE HEMATITE DECOMMISSIONING PROJECT, FESTUS, MISSOURI

    SciTech Connect (OSTI)

    Bailey, Erika N.; Lee, Jason D.

    2012-09-21

    ORAU conducted confirmatory surveys of the Hematite site during the period of June 12 through June 13, 2012. The survey activities included in-process inspections, document review, walkover surveys, sampling activities, and laboratory analysis of split samples. WEC was forthcoming with information relating to practices, procedures, and surface scan results. Scans performed by the WEC technician were extremely thorough and methodical. The WEC and ORAU technicians identified the same areas of elevated activity with comparable detector responses. WEC sampling of re-use soils, waste soils, sediments, and groundwater were conducted under ORAU observation. The sampling efforts observed by ORAU were performed in accordance with site-specific procedures and in a manner sufficient to provide quality supporting data. Three observations were made during groundwater sampling activities. First, the water level indicator was re-used without submitting rinse blank. Second, bubbles created during tubing extraction could indicate the presence of volatilized organic compounds. Third, samplers did not use a photo ionization detector prior to sample collection to indicate the presence of volatile organic vapors. Results of split samples indicated a high level of comparability between the WEC and ORAU/ORISE radiological laboratories. Analytical practices and procedures appear to be sufficient in providing quality radiochemical data. All concentrations from the Soil Re-Use Area and sediment samples are below Uniform radionuclide-specific derived concentration guideline level (DCGL{sub W}) limits; thus, comparisons to the less conservative stratified geometry were not required. Results were compared to individual DCGLs and using the sum of fractions approach. Both composite soil samples collected from the Waste Handling Area (Bins 1 and 4) were well below the prescribed USEI waste acceptance criteria.

  5. Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-02-01

    This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  6. Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-03-01

    This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  7. Independent Confirmatory Survey Report for the University of Arizona Nuclear Reactor Laboratory, Tucson, Arizona

    SciTech Connect (OSTI)

    Nick A. Altic

    2011-11-11

    The University of Arizona (University) research reactor is a TRIGA swimming pool type reactor designed by General Atomics and constructed at the University in 1958. The reactor first went into operation in December of 1958 under U.S. Nuclear Regulatory Commission (NRC) license R-52 until final shut down on May 18, 2010. Initial site characterization activities were conducted in February 2009 during ongoing reactor operations to assess the radiological status of the Nuclear Reactor Laboratory (NRL) excluding the reactor tank, associated components, and operating systems. Additional post-shutdown characterization activities were performed to complete characterization activities as well as verify assumptions made in the Decommissioning Plan (DP) that were based on a separate activation analysis (ESI 2009 and WMG 2009). Final status survey (FSS) activities began shortly after the issuance of the FSS plan in May 2011. The contractor completed measurement and sampling activities during the week of August 29, 2011.

  8. TYPE A VERIFICATION REPORT FOR THE HIGH FLUX BEAM REACTOR STACK AND GROUNDS, BROOKHAVEN NATIONAL LABORATORY, UPTON, NEW YORK DCN 5098-SR-08-0

    SciTech Connect (OSTI)

    Evan Harpenau

    2011-11-30

    The U.S. Department of Energy (DOE) Order 458.1 requires independent verification (IV) of DOE cleanup projects (DOE 2011). The Oak Ridge Institute for Science and Education (ORISE) has been designated as the responsible organization for IV of the High Flux Beam Reactor (HFBR) Stack and Grounds area at Brookhaven National Laboratory (BNL) in Upton, New York. The IV evaluation may consist of an in-process inspection with document and data reviews (Type A Verification) or a confirmatory survey of the site (Type B Verification). DOE and ORISE determined that a Type A verification of the documents and data for the HFBR Stack and Grounds: Survey Units (SU) 6, 7, and 8 was appropriate based on the initial survey unit classification, the walkover surveys, and the final analytical results provided by the Brookhaven Science Associates (BSA).

  9. Become an SEP Verification Body

    Broader source: Energy.gov [DOE]

    Superior Energy Performance® (SEP™) establishes a high standard in energy management and performance, and SEP certification validates your commitment to energy efficiency by verifying your achieved energy performance improvement using an ANSI-ANAB Accredited Verification body. This third-party verification provides independent confirmation of energy performance achievements and commitment to managing energy use. Currently, SEP is the only national certification program offering this level of rigor and credibility to industrial facilities through accredited third-party verification of sustained energy performance improvements.

  10. ORISE: The Value of Independence, a white paper on DOE Order...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    verification process at almost any stage of a cleanup project. DOE has incorporated the language requiring the independent verification of nuclear cleanup activities as an added...

  11. Independent Oversight Review, Pantex Plant - February 2012 |...

    Office of Environmental Management (EM)

    Plant - February 2012 Independent Oversight Review, Pantex Plant - February 2012 February 2012 Review of the Pantex Plant Implementation Verification Review Processes This report ...

  12. Lessons Learned from Independent Verification Activities | Department...

    Office of Environmental Management (EM)

    The Department of Energy clears property from radiological control after the property has been demonstrated to meet the Department's stringent radiation protection requirements. ...

  13. Systems analysis - independent analysis and verification

    SciTech Connect (OSTI)

    DiPietro, J.P.; Skolnik, E.G.; Badin, J.S.

    1996-10-01

    The Hydrogen Program of the U.S. Department of Energy (DOE) funds a portfolio of activities ranging from conceptual research to pilot plant testing. The long-term research projects support DOE`s goal of a sustainable, domestically based energy system, and the development activities are focused on hydrogen-based energy systems that can be commercially viable in the near-term. Energetics develops analytic products that enable the Hydrogen Program Manager to assess the potential for near- and long-term R&D activities to satisfy DOE and energy market criteria. This work is based on a pathway analysis methodology. The authors consider an energy component (e.g., hydrogen production from biomass gasification, hybrid hydrogen internal combustion engine (ICE) vehicle) within a complete energy system. The work involves close interaction with the principal investigators to ensure accurate representation of the component technology. Comparisons are made with the current cost and performance of fossil-based and alternative renewable energy systems, and sensitivity analyses are conducted to determine the effect of changes in cost and performance parameters on the projects` viability.

  14. Independent Verification Survey Report for the Offsite Portion of the Potential Release Site-7 Abandoned Sanitary Line, Miamisburg Closure Project, Miamisburg, Ohio

    SciTech Connect (OSTI)

    P.C. Weaver

    2008-08-15

    The ORISE objective was to confirm that the remedial action process implemented by the contractor was in accordance with the PRS-7 Work Package. Following removal of the sanitary line, the soil beneath the line would be sampled to determine if remediation was required (ARC 2007a).

  15. Final Report Independent Verification Survey of the High Flux Beam Reactor, Building 802 Fan House Brookhaven National Laboratory Upton, New York

    SciTech Connect (OSTI)

    Evan Harpeneau

    2011-06-24

    The Separations Process Research Unit (SPRU) complex located on the Knolls Atomic Power Laboratory (KAPL) site in Niskayuna, New York, was constructed in the late 1940s to research the chemical separation of plutonium and uranium (Figure A-1). SPRU operated as a laboratory scale research facility between February 1950 and October 1953. The research activities ceased following the successful development of the reduction oxidation and plutonium/uranium extraction processes. The oxidation and extraction processes were subsequently developed for large scale use by the Hanford and Savannah River sites (aRc 2008a). Decommissioning of the SPRU facilities began in October 1953 and continued through the 1990s.

  16. REVISED FINAL REPORT – INDEPENDENT VERIFICATION SURVEY ACTIVITIES AT THE SEPARATIONS PROCESS RESEARCH UNIT SITES, NISKAYUNA, NEW YORK – DCN 0496-SR-06-1

    SciTech Connect (OSTI)

    Evan Harpenau

    2011-10-10

    The Separations Process Research Unit (SPRU) complex located on the Knolls Atomic Power Laboratory (KAPL) site in Niskayuna, New York, was constructed in the late 1940s to research the chemical separation of plutonium and uranium (Figure A-1). SPRU operated as a laboratory scale research facility between February 1950 and October 1953. The research activities ceased following the successful development of the reduction oxidation and plutonium/uranium extraction processes. The oxidation and extraction processes were subsequently developed for large scale use by the Hanford and Savannah River sites (aRc 2008a). Decommissioning of the SPRU facilities began in October 1953 and continued through the 1990s.

  17. Additional Verification Bodies Now Available for SEP | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Additional Verification Bodies Now Available for SEP Additional Verification Bodies Now Available for SEP May 14, 2014 - 11:40am Addthis Superior Energy Performance (SEP) recognizes industrial facilities that demonstrate energy management excellence and sustained energy savings. Third-party verification using an ANSI-ANAB Accredited Verification Body offers robust, independent confirmation of a facility's conformance to ISO 50001 and improved energy performance-providing accurate energy numbers

  18. ORISE: Characterization surveys

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Assessments and Health Physics Capabilities Overview Independent verification Environmental assessments Health physics services Radiochemical analyses Health physics training How ORISE is Making a Difference Overview Environmental assessment at ORNL a Recovery Act success American Recovery and Reinvestment Act ARRA-funded work creates opportunities for TN-based small businesses Resources Overview MARSAME resources MARSSIM Independent verification white paper Standards development

  19. Oak Ridge Associated VERIFICATION Universities OF OF

    Office of Legacy Management (LM)

    y /I/ i Prepared by Oak Ridge Associated VERIFICATION Universities OF OF - Prepared for the Decontamination and 1985 AND 1986 REMEDIAL ACTIONS Decommissioning Division NIAGARA FALLS STORAGE SITE U.S. Department VICINITY PROPERTIES of Energy of Energy LEWISTON, NEW YORK 3I~~~~ ~~~J. D. BERGER l I I I I I Environmental Survey and Site Assessment Program Energy/Environment Systems Division FINAL REPORT JULY 1990 VERIFICATION OF 1985 AND 1986 REMEDIAL ACTIONS NIAGARA FALLS STORAGE SITE VICINITY

  20. Surveys

    Broader source: Energy.gov [DOE]

    Surveys can be a useful way to gauge the opinions of your readers and learn more about your website's audiences, but you'll often need approval from the Office of Management and Budget (OMB) to run...

  1. Recommendation 165: Recommendation on Conducting Future Verifications of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cleanup | Department of Energy 165: Recommendation on Conducting Future Verifications of Cleanup Recommendation 165: Recommendation on Conducting Future Verifications of Cleanup The ORSSAB commends the DOE policy of obtaining independent verification of DOE Environmental Management-related activities. Recommendation 165 (96.84 KB) DOE response to recommendation 165 (1.39 MB) More Documents & Publications OREM Accomplishments Timeline ORSSAB Meeting - April 2013 Recommendation 170:

  2. Verification of Adaptive Systems

    SciTech Connect (OSTI)

    Pullum, Laura L; Cui, Xiaohui; Vassev, Emil; Hinchey, Mike; Rouff, Christopher; Buskens, Richard

    2012-01-01

    Adaptive systems are critical for future space and other unmanned and intelligent systems. Verification of these systems is also critical for their use in systems with potential harm to human life or with large financial investments. Due to their nondeterministic nature and extremely large state space, current methods for verification of software systems are not adequate to provide a high level of assurance for them. The combination of stabilization science, high performance computing simulations, compositional verification and traditional verification techniques, plus operational monitors, provides a complete approach to verification and deployment of adaptive systems that has not been used before. This paper gives an overview of this approach.

  3. Fuel Retrieval System (FRS) Design Verification

    SciTech Connect (OSTI)

    YANOCHKO, R.M.

    2000-01-27

    This document was prepared as part of an independent review to explain design verification activities already completed, and to define the remaining design verification actions for the Fuel Retrieval System. The Fuel Retrieval Subproject was established as part of the Spent Nuclear Fuel Project (SNF Project) to retrieve and repackage the SNF located in the K Basins. The Fuel Retrieval System (FRS) construction work is complete in the KW Basin, and start-up testing is underway Design modifications and construction planning are also underway for the KE Basin. An independent review of the design verification process as applied to the K Basin projects was initiated in support of preparation for the SNF Project operational readiness review (ORR).

  4. The DES Science Verification Weak Lensing Shear Catalogs

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Jarvis, M.

    2016-05-01

    We present weak lensing shear catalogs for 139 square degrees of data taken during the Science Verification (SV) time for the new Dark Energy Camera (DECam) being used for the Dark Energy Survey (DES). We describe our object selection, point spread function estimation and shear measurement procedures using two independent shear pipelines, IM3SHAPE and NGMIX, which produce catalogs of 2.12 million and 3.44 million galaxies respectively. We also detail a set of null tests for the shear measurements and find that they pass the requirements for systematic errors at the level necessary for weak lensing science applications using the SVmore » data. Furthermore, we discuss some of the planned algorithmic improvements that will be necessary to produce sufficiently accurate shear catalogs for the full 5-year DES, which is expected to cover 5000 square degrees.« less

  5. The DES Science Verification Weak Lensing Shear Catalogs

    SciTech Connect (OSTI)

    Jarvis, M.

    2015-07-20

    We present weak lensing shear catalogs for 139 square degrees of data taken during the Science Verification (SV) time for the new Dark Energy Camera (DECam) being used for the Dark Energy Survey (DES). We describe our object selection, point spread function estimation and shear measurement procedures using two independent shear pipelines, IM3SHAPE and NGMIX, which produce catalogs of 2.12 million and 3.44 million galaxies respectively. We also detail a set of null tests for the shear measurements and find that they pass the requirements for systematic errors at the level necessary for weak lensing science applications using the SV data. Furthermore, we discuss some of the planned algorithmic improvements that will be necessary to produce sufficiently accurate shear catalogs for the full 5-year DES, which is expected to cover 5000 square degrees.

  6. Verification Challenges at Low Numbers

    SciTech Connect (OSTI)

    Benz, Jacob M.; Booker, Paul M.; McDonald, Benjamin S.

    2013-06-01

    Many papers have dealt with the political difficulties and ramifications of deep nuclear arms reductions, and the issues of “Going to Zero”. Political issues include extended deterrence, conventional weapons, ballistic missile defense, and regional and geo-political security issues. At each step on the road to low numbers, the verification required to ensure compliance of all parties will increase significantly. Looking post New START, the next step will likely include warhead limits in the neighborhood of 1000 . Further reductions will include stepping stones at1000 warheads, 100’s of warheads, and then 10’s of warheads before final elimination could be considered of the last few remaining warheads and weapons. This paper will focus on these three threshold reduction levels, 1000, 100’s, 10’s. For each, the issues and challenges will be discussed, potential solutions will be identified, and the verification technologies and chain of custody measures that address these solutions will be surveyed. It is important to note that many of the issues that need to be addressed have no current solution. In these cases, the paper will explore new or novel technologies that could be applied. These technologies will draw from the research and development that is ongoing throughout the national laboratory complex, and will look at technologies utilized in other areas of industry for their application to arms control verification.

  7. Fuel Retrieval System Design Verification Report

    SciTech Connect (OSTI)

    GROTH, B.D.

    2000-04-11

    The Fuel Retrieval Subproject was established as part of the Spent Nuclear Fuel Project (SNF Project) to retrieve and repackage the SNF located in the K Basins. The Fuel Retrieval System (FRS) construction work is complete in the KW Basin, and start-up testing is underway. Design modifications and construction planning are also underway for the KE Basin. An independent review of the design verification process as applied to the K Basin projects was initiated in support of preparation for the SNF Project operational readiness review (ORR). A Design Verification Status Questionnaire, Table 1, is included which addresses Corrective Action SNF-EG-MA-EG-20000060, Item No.9 (Miller 2000).

  8. Voltage verification unit

    DOE Patents [OSTI]

    Martin, Edward J.

    2008-01-15

    A voltage verification unit and method for determining the absence of potentially dangerous potentials within a power supply enclosure without Mode 2 work is disclosed. With this device and method, a qualified worker, following a relatively simple protocol that involves a function test (hot, cold, hot) of the voltage verification unit before Lock Out/Tag Out and, and once the Lock Out/Tag Out is completed, testing or "trying" by simply reading a display on the voltage verification unit can be accomplished without exposure of the operator to the interior of the voltage supply enclosure. According to a preferred embodiment, the voltage verification unit includes test leads to allow diagnostics with other meters, without the necessity of accessing potentially dangerous bus bars or the like.

  9. Verification Monitoring Report

    Office of Legacy Management (LM)

    and Analytical Update for the Durango, Colorado, Processing Site August 2014 LMS/DUP/S11345 This page intentionally left blank LMS/DUP/S11345 Verification Monitoring Report and Analytical Update for the Durango, Colorado, Processing Site August 2014 This page intentionally left blank U.S. Department of Energy Verification Monitoring Report and Analytical Update-Durango, Colorado, Processing Site August 2014 Doc. No. S11345 Page i Contents Abbreviations

  10. Employment Eligibility Verification

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Instructions for Employment Eligibility Verification Department of Homeland Security U.S. Citizenship and Immigration Services USCIS Form I-9 OMB No. 1615-0047 Expires 03/31/2016 Read all instructions carefully before completing this form. Anti-Discrimination Notice. It is illegal to discriminate against any work-authorized individual in hiring, discharge, recruitment or referral for a fee, or in the employment eligibility verification (Form I-9 and E-Verify) process based on that individual's

  11. Measurement & Verification with Green Button Data | Department...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Measurement & Verification with Green Button Data Measurement & Verification with Green ... Measurement and verification (M&V) focuses on ensuring that the savings from energy ...

  12. Independent Oversight Review, Savannah River Site - September 2011 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy - September 2011 Independent Oversight Review, Savannah River Site - September 2011 September 2011 Review of the Implementation Verification Review Processes at the Savannah River Site Environmental Management Nuclear Facilities This report provides the results of an independent oversight review of the of the Implementation Verification Review (IVR) processes for the Environmental Management nuclear facilities at the Department of Energy's (DOE) Savannah River Site. The

  13. Independent Oversight Review, Y-12 National Security Complex - June 2012 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Y-12 National Security Complex - June 2012 Independent Oversight Review, Y-12 National Security Complex - June 2012 June 2012 Review of the Y-12 Implementation Verification Review Processes This report documents the results of an independent review of the implementation verification review (IVR) processes at the Department of Energy's (DOE) Y-12 National Security Complex. The review was conducted March 12-30, 2012, by the DOE Office of Safety and Emergency Management

  14. Verification and validation benchmarks.

    SciTech Connect (OSTI)

    Oberkampf, William Louis; Trucano, Timothy Guy

    2007-02-01

    Verification and validation (V&V) are the primary means to assess the accuracy and reliability of computational simulations. V&V methods and procedures have fundamentally improved the credibility of simulations in several high-consequence fields, such as nuclear reactor safety, underground nuclear waste storage, and nuclear weapon safety. Although the terminology is not uniform across engineering disciplines, code verification deals with assessing the reliability of the software coding, and solution verification deals with assessing the numerical accuracy of the solution to a computational model. Validation addresses the physics modeling accuracy of a computational simulation by comparing the computational results with experimental data. Code verification benchmarks and validation benchmarks have been constructed for a number of years in every field of computational simulation. However, no comprehensive guidelines have been proposed for the construction and use of V&V benchmarks. For example, the field of nuclear reactor safety has not focused on code verification benchmarks, but it has placed great emphasis on developing validation benchmarks. Many of these validation benchmarks are closely related to the operations of actual reactors at near-safety-critical conditions, as opposed to being more fundamental-physics benchmarks. This paper presents recommendations for the effective design and use of code verification benchmarks based on manufactured solutions, classical analytical solutions, and highly accurate numerical solutions. In addition, this paper presents recommendations for the design and use of validation benchmarks, highlighting the careful design of building-block experiments, the estimation of experimental measurement uncertainty for both inputs and outputs to the code, validation metrics, and the role of model calibration in validation. It is argued that the understanding of predictive capability of a computational model is built on the level of

  15. Environmental Technology Verification of Mobile Sources Control...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Technology Verification of Mobile Sources Control Technologies Environmental Technology Verification of Mobile Sources Control Technologies 2005 Diesel Engine...

  16. SAPHIRE 8 Software Independent Verification and Validation Plan

    SciTech Connect (OSTI)

    Rae J. Nims

    2009-04-01

    SAPHIRE 8 is being developed with a phased or cyclic iterative rapid application development methodology. Due to this approach, a similar approach is being taken for the IV&V activities on each vital software object. The IV&V plan is structured around NUREG/BR-0167, “Software Quality Assurance Program and Guidelines,” February 1993. The Nuclear Regulatory Research Office Instruction No.: PRM-12, “Software Quality Assurance for RES Sponsored Codes,” March 26, 2007 specifies that RES-sponsored software is to be evaluated against NUREG/BR-0167. Per the guidance in NUREG/BR-0167, SAPHIRE is classified as “Level 1.” Level 1 software corresponds to technical application software used in a safety decision.

  17. SAPHIRE 8 Software Independent Verification and Validation Plan

    SciTech Connect (OSTI)

    Rae J. Nims; Kent M. Norris

    2010-02-01

    SAPHIRE 8 is being developed with a phased or cyclic iterative rapid application development methodology. Due to this approach, a similar approach is being taken for the IV&V activities on each vital software object. The IV&V plan is structured around NUREG/BR-0167, “Software Quality Assurance Program and Guidelines,” February 1993. The Nuclear Regulatory Research Office Instruction No.: PRM-12, “Software Quality Assurance for RES Sponsored Codes,” March 26, 2007 specifies that RES-sponsored software is to be evaluated against NUREG/BR-0167. Per the guidance in NUREG/BR-0167, SAPHIRE is classified as “Level 1.” Level 1 software corresponds to technical application software used in a safety decision.

  18. Weak lensing by galaxy troughs in DES Science Verification data

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Gruen, D.; Friedrich, O.; Amara, A.; Bacon, D.; Bonnett, C.; Hartley, W.; Jain, B.; M. Jarvis; Kavprzak, T.; Krause, E.; et al

    2015-11-29

    In this study, we measure the weak lensing shear around galaxy troughs, i.e. the radial alignment of background galaxies relative to underdensities in projections of the foreground galaxy field over a wide range of redshift in Science Verification data from the Dark Energy Survey. Our detection of the shear signal is highly significant (10σ–15σ for the smallest angular scales) for troughs with the redshift range z ϵ [0.2, 0.5] of the projected galaxy field and angular diameters of 10 arcmin…1°. These measurements probe the connection between the galaxy, matter density, and convergence fields. By assuming galaxies are biased tracers ofmore » the matter density with Poissonian noise, we find agreement of our measurements with predictions in a fiducial Λ cold dark matter model. The prediction for the lensing signal on large trough scales is virtually independent of the details of the underlying model for the connection of galaxies and matter. Our comparison of the shear around troughs with that around cylinders with large galaxy counts is consistent with a symmetry between galaxy and matter over- and underdensities. In addition, we measure the two-point angular correlation of troughs with galaxies which, in contrast to the lensing signal, is sensitive to galaxy bias on all scales. The lensing signal of troughs and their clustering with galaxies is therefore a promising probe of the statistical properties of matter underdensities and their connection to the galaxy field.« less

  19. Weak lensing by galaxy troughs in DES Science Verification data

    SciTech Connect (OSTI)

    Gruen, D.; Friedrich, O.; Amara, A.; Bacon, D.; Bonnett, C.; Hartley, W.; Jain, B.; M. Jarvis; Kavprzak, T.; Krause, E.; Mana, A.; Rozo, E.; Rykoff, E. S.; Seitz, S.; Sheldon, E.; Troxel, M. A.; Vikram, V.; Abbott, T. M. C.; Abdalla, F. B.; Allam, S.; Armstrong, R.; Banerji, M.; Bauer, A. H.; Becker, M. R.; Benoit-Levy, A.; Bernstein, G. M.; Bernstein, R. A.; Bertin, E.; Bridle, S. L.; Brooks, D.; Buckley-Geer, E.; Burke, D. L.; Capozzi, D.; Rosell, A. Carnero; Carretero, J.; Crocce, M.; Cunha, C. E.; D'Andrea, C. B.; da Costa, L. N.; DePoy, D. L.; Desai, S.; Diehl, H. T.; Dietrich, J. P.; Doel, P.; Eifler, T. F.; Neto, A. Fausti; Fernandez, E.; Flaugher, B.; Fosalba, P.; Frieman, J.; Gerdes, D. W.; Gruendl, R. A.; Gutierrez, G.; Honscheid, K.; James, D. J.; Kuehn, K.; Kuropatkin, N.; Lahav, O.; Li, T. S.; Lima, M.; Maia, M. A. G.; March, M.; Martini, P.; Melchior, P.; Miller, C. J.; Miguel, R.; Mohr, J. J.; Nord, B.; Orgando, R.; Plazas, A. A.; Reil, K.; Romer, A. K.; Roodman, A.; Sako, M.; Sanchez, E.; Scarpine, V.; Schubnell, M.; Sevilla-Noarbe, I.; Smith, R. C.; Soares-Santos, M.; Sobreira, F.; Suchyta, E.; Swanson, M. E. C.; Tarle, G.; Thaler, J.; Thomas, D.; Walker, A. R.; Wechsler, R. H.; Weller, J.; Zhang, Y.; Zuntz, J.

    2015-11-29

    In this study, we measure the weak lensing shear around galaxy troughs, i.e. the radial alignment of background galaxies relative to underdensities in projections of the foreground galaxy field over a wide range of redshift in Science Verification data from the Dark Energy Survey. Our detection of the shear signal is highly significant (10σ–15σ for the smallest angular scales) for troughs with the redshift range z ϵ [0.2, 0.5] of the projected galaxy field and angular diameters of 10 arcmin…1°. These measurements probe the connection between the galaxy, matter density, and convergence fields. By assuming galaxies are biased tracers of the matter density with Poissonian noise, we find agreement of our measurements with predictions in a fiducial Λ cold dark matter model. The prediction for the lensing signal on large trough scales is virtually independent of the details of the underlying model for the connection of galaxies and matter. Our comparison of the shear around troughs with that around cylinders with large galaxy counts is consistent with a symmetry between galaxy and matter over- and underdensities. In addition, we measure the two-point angular correlation of troughs with galaxies which, in contrast to the lensing signal, is sensitive to galaxy bias on all scales. The lensing signal of troughs and their clustering with galaxies is therefore a promising probe of the statistical properties of matter underdensities and their connection to the galaxy field.

  20. Weak Lensing by Galaxy Troughs in DES Science Verification Data

    SciTech Connect (OSTI)

    Gruen, D.

    2015-09-29

    We measure the weak lensing shear around galaxy troughs, i.e. the radial alignment of background galaxies relative to underdensities in projections of the foreground galaxy field over a wide range of redshift in Science Verification data from the Dark Energy Survey. Our detection of the shear signal is highly significant (10σ–15σ for the smallest angular scales) for troughs with the redshift range z ϵ [0.2, 0.5] of the projected galaxy field and angular diameters of 10 arcmin…1°. These measurements probe the connection between the galaxy, matter density, and convergence fields. By assuming galaxies are biased tracers of the matter density with Poissonian noise, we find agreement of our measurements with predictions in a fiducial Λ cold dark matter model. Furthermore, the prediction for the lensing signal on large trough scales is virtually independent of the details of the underlying model for the connection of galaxies and matter. Our comparison of the shear around troughs with that around cylinders with large galaxy counts is consistent with a symmetry between galaxy and matter over- and underdensities. In addition, we measure the two-point angular correlation of troughs with galaxies which, in contrast to the lensing signal, is sensitive to galaxy bias on all scales. Finally, the lensing signal of troughs and their clustering with galaxies is therefore a promising probe of the statistical properties of matter underdensities and their connection to the galaxy field.

  1. DOE Challenge Home Verification

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Challenge Home Verification Projected Rating: Based on Plans - Field Confirmation Required. Energy Performance House Ty pe DOE Challenge Home Builder Partner ID# Single-family det ac hed 12345 Y ear built Square footage of Conditioned Space including Basement 2013 3968.0 Numbe r of Bedrooms Square footage of Conditioned Space without Basement 4 2368.0 Site addre ss (if no t available , list the site Lo t #) Registered Builder 555 Main St r eet Cold City Certified Rater MN, 20853 HERS Index

  2. verification | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    verification Nuclear Verification Challenge: Maintain the U.S. ability to monitor and verify nuclear reduction agreements and detect violations of treaties and other nuclear nonproliferation commitments. Solution: Develop and deploy measures to ensure verifiable compliance with treaties and other international agreements,... International Nuclear Safeguards Challenge: Detect/deter undeclared nuclear materials and activities. Solution: Build capacity of the International Atomic Energy Agency and

  3. Software Verification and Validation Procedure

    SciTech Connect (OSTI)

    Olund, Thomas S.

    2008-09-15

    This Software Verification and Validation procedure provides the action steps for the Tank Waste Information Network System (TWINS) testing process. The primary objective of the testing process is to provide assurance that the software functions as intended, and meets the requirements specified by the client. Verification and validation establish the primary basis for TWINS software product acceptance.

  4. Benefits of Evaluation, Measurement, and Verification | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Benefits of Evaluation, Measurement, and Verification Benefits of Evaluation, Measurement, and Verification This document provides information about the benefits of performing ...

  5. Verification and validation of RADMODL Version 1.0

    SciTech Connect (OSTI)

    Kimball, K.D.

    1993-03-01

    RADMODL is a system of linked computer codes designed to calculate the radiation environment following an accident in which nuclear materials are released. The RADMODL code and the corresponding Verification and Validation (V&V) calculations (Appendix A), were developed for Westinghouse Savannah River Company (WSRC) by EGS Corporation (EGS). Each module of RADMODL is an independent code and was verified separately. The full system was validated by comparing the output of the various modules with the corresponding output of a previously verified version of the modules. The results of the verification and validation tests show that RADMODL correctly calculates the transport of radionuclides and radiation doses. As a result of this verification and validation effort, RADMODL Version 1.0 is certified for use in calculating the radiation environment following an accident.

  6. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant - April

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2013 | Department of Energy Portsmouth Gaseous Diffusion Plant - April 2013 Independent Oversight Review, Portsmouth Gaseous Diffusion Plant - April 2013 April 2013 Review of the Integrated Safety Management System Phase I Verification Review at the Portsmouth Gaseous Diffusion Plant The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the U.S. Department of Energy (DOE) Portsmouth/Paducah

  7. Recommendation 207: Automate the Stewardship Verification Process

    Broader source: Energy.gov [DOE]

    ORSSAB recommends DOE automate the Stewardship Verification Process for the Remediation Effectiveness Report.

  8. ESPC ENABLE Measurement and Verification Plan Template

    Broader source: Energy.gov [DOE]

    Document contains a comprehensive measurement and verification plan template for a proposed ESPC ENABLE project.

  9. AHAM DOE Verification Test Agreement | Department of Energy

    Energy Savers [EERE]

    DOE Verification Test Agreement AHAM DOE Verification Test Agreement This letter is to inform AHAM that DOE is adopting a new policy regarding DOE ENERGY STAR verification testing ...

  10. Revised FINAL–REPORT NO. 2: INDEPENDENT CONFIRMATORY SURVEY SUMMARY AND RESULTS FOR THE ENRICO FERMI ATOMIC POWER PLANT, UNIT 1, NEWPORT, MICHIGAN (DOCKET NO. 50 16; RFTA 10-004) 2018-SR-02-1

    SciTech Connect (OSTI)

    Erika Bailey

    2011-10-27

    ) site visit to Fermi 1 in November 2010. The survey was strategically planned during a Unit 2 (Fermi 2) outage to take advantage of decreased radiation levels that were observed and attributed to Fermi 2 from the operating unit during the first site visit. However, during the second visit there were elevated radiation levels observed and attributed to the partially dismantled Fermi 1 reactor vessel and a waste storage box located on the 3rd floor of the Fermi 1 Turbine Building. Confirmatory surveys (unshielded) performed directly in the line of sight of these areas were affected. The objective of the confirmatory survey was to verify that the final radiological conditions were accurately and adequately described in Final Status Survey (FSS) documentation, relative to the established release criteria. This objective was achieved by performing document reviews, as well as independent measurements and sampling. Specifically, documentation of the planning, implementation, and results of the FSS were evaluated; side-by-side FSS measurement and source comparisons were performed; site areas were evaluated relative to appropriate FSS classification; and areas were assessed for residual, undocumented contamination.

  11. ORISE: The Value of Independence, a white paper on DOE Order 458.1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Value of Independence ORISE white paper explains how DOE Order 458.1 brings independent verification to the forefront of D&D projects With the release of DOE Order 458.1 in February 2011, the U.S. Department of Energy has made independent verification an official requirement for contractors involved in decontamination and decommissioning (D&D) projects at former nuclear sites operated by DOE. In the white paper The Value of Independence (PDF, 500KB), ORISE provides more background on

  12. Independent Oversight Focused Review, Kansas City Plant, Summary Report -

    Energy Savers [EERE]

    Department of Energy Savannah River Remediation - July 2010 Independent Activity Report, Savannah River Remediation - July 2010 July 2010 Savannah River Operations Office Integrated Safety Management System Phase II Verification Review of Savannah River Remediation The U.S. Department of Energy (DOE), Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), participated in the DOE Savannah River Operations Office (DOE-SR), Office of Safety and Quality

  13. Independent Oversight Review, Portsmouth/Paducah Project Office - May 2012

    Energy Savers [EERE]

    - January 2012 | Department of Energy Savannah River National Laboratory - January 2012 Independent Oversight Follow-up Review, Savannah River National Laboratory - January 2012 January 2012 Follow-up Review of Implementation Verification Reviews at the Savannah River National Laboratory Savannah River Site This report provides the results of an independent review of the identification and implementation of safety basis hazard controls associated with "flashing spray release"

  14. Independent Oversight Inspection, East Tennessee Technology Park, Summary

    Office of Environmental Management (EM)

    - January 2012 | Department of Energy Review, Savannah River National Laboratory - January 2012 Independent Oversight Follow-up Review, Savannah River National Laboratory - January 2012 January 2012 Follow-up Review of Implementation Verification Reviews at the Savannah River National Laboratory Savannah River Site This report provides the results of an independent review of the identification and implementation of safety basis hazard controls associated with "flashing spray

  15. Independent Activity Report, Savannah River Remediation - July 2010 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Savannah River Remediation - July 2010 Independent Activity Report, Savannah River Remediation - July 2010 July 2010 Savannah River Operations Office Integrated Safety Management System Phase II Verification Review of Savannah River Remediation The U.S. Department of Energy (DOE), Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), participated in the DOE Savannah River Operations Office (DOE-SR), Office of Safety and Quality

  16. Independent Oversight Follow-up Review, Savannah River National Laboratory

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - January 2012 | Department of Energy Savannah River National Laboratory - January 2012 Independent Oversight Follow-up Review, Savannah River National Laboratory - January 2012 January 2012 Follow-up Review of Implementation Verification Reviews at the Savannah River National Laboratory Savannah River Site This report provides the results of an independent review of the identification and implementation of safety basis hazard controls associated with "flashing spray release"

  17. Carbon Storage Monitoring, Verification and Accounting Research |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Monitoring, Verification and Accounting Research Carbon Storage Monitoring, Verification and Accounting Research Reliable and cost-effective monitoring, verification and accounting (MVA) techniques are an important part of making geologic sequestration a safe, effective, and acceptable method for greenhouse gas control. MVA of geologic storage sites is expected to serve several purposes, including addressing safety and environmental concerns; inventory verification;

  18. Uncertainty in verification and validation: recent perspective...

    Office of Scientific and Technical Information (OSTI)

    Country of Publication: United States Language: English Subject: 99 GENERAL AND MISCELLANEOUSMATHEMATICS, COMPUTING, AND INFORMATION SCIENCE; VALIDATION; VERIFICATION; COMPUTER ...

  19. Independent Peer Reviews

    SciTech Connect (OSTI)

    2012-03-16

    Independent Assessments: DOE's Systems Integrator convenes independent technical reviews to gauge progress toward meeting specific technical targets and to provide technical information necessary for key decisions.

  20. Independent Oversight Review, Pantex Site Office - June 2012 | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Site Office - June 2012 Independent Oversight Review, Pantex Site Office - June 2012 June 2012 Review of the Pantex Site Office's Compliance with DOE Order 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities eview of the Pantex Site Office's (PXSO) compliance with DOE Order 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities. The review was performed onsite from April 2 to 5 and off site through April 24, 2012, by the U.S. Department

  1. Verification of RESRAD-build computer code, version 3.1.

    SciTech Connect (OSTI)

    2003-06-02

    RESRAD-BUILD is a computer model for analyzing the radiological doses resulting from the remediation and occupancy of buildings contaminated with radioactive material. It is part of a family of codes that includes RESRAD, RESRAD-CHEM, RESRAD-RECYCLE, RESRAD-BASELINE, and RESRAD-ECORISK. The RESRAD-BUILD models were developed and codified by Argonne National Laboratory (ANL); version 1.5 of the code and the user's manual were publicly released in 1994. The original version of the code was written for the Microsoft DOS operating system. However, subsequent versions of the code were written for the Microsoft Windows operating system. The purpose of the present verification task (which includes validation as defined in the standard) is to provide an independent review of the latest version of RESRAD-BUILD under the guidance provided by ANSI/ANS-10.4 for verification and validation of existing computer programs. This approach consists of a posteriori V&V review which takes advantage of available program development products as well as user experience. The purpose, as specified in ANSI/ANS-10.4, is to determine whether the program produces valid responses when used to analyze problems within a specific domain of applications, and to document the level of verification. The culmination of these efforts is the production of this formal Verification Report. The first step in performing the verification of an existing program was the preparation of a Verification Review Plan. The review plan consisted of identifying: Reason(s) why a posteriori verification is to be performed; Scope and objectives for the level of verification selected; Development products to be used for the review; Availability and use of user experience; and Actions to be taken to supplement missing or unavailable development products. The purpose, scope and objectives for the level of verification selected are described in this section of the Verification Report. The development products that were used for

  2. Letter Report - Verification Results for the Non-Real Property Radiological Release Program at the West Valley Demonstration Project, Ashford, New York

    SciTech Connect (OSTI)

    M.A. Buchholz

    2009-04-29

    The objective of the verification activities is to provide an independent review of the design, implementation, and performance of the radiological unrestricted release program for personal property, materials, and equipment (non-real property).

  3. Nuclear Data Verification and Standardization

    SciTech Connect (OSTI)

    Karam, Lisa R.; Arif, Muhammad; Thompson, Alan K.

    2011-10-01

    The objective of this interagency program is to provide accurate neutron interaction verification and standardization data for the U.S. Department of Energy Division of Nuclear Physics programs which include astrophysics, radioactive beam studies, and heavy-ion reactions. The measurements made in this program are also useful to other programs that indirectly use the unique properties of the neutron for diagnostic and analytical purposes. These include homeland security, personnel health and safety, nuclear waste disposal, treaty verification, national defense, and nuclear based energy production. The work includes the verification of reference standard cross sections and related neutron data employing the unique facilities and capabilities at NIST and other laboratories as required; leadership and participation in international intercomparisons and collaborations; and the preservation of standard reference deposits. An essential element of the program is critical evaluation of neutron interaction data standards including international coordinations. Data testing of critical data for important applications is included. The program is jointly supported by the Department of Energy and the National Institute of Standards and Technology.

  4. Verification of Sulfate Attack Penetration Rates for Saltstone Disposal Unit Modeling

    SciTech Connect (OSTI)

    Flach, G. P.

    2015-05-12

    Recent Special Analysis modeling of Saltstone Disposal Units consider sulfate attack on concrete and utilize degradation rates estimated from Cementitious Barriers Partnership software simulations. This study provides an independent verification of those simulation results using an alternative analysis method and an independent characterization data source. The sulfate penetration depths estimated herein are similar to the best-estimate values in SRNL-STI-2013-00118 Rev. 2 and well below the nominal values subsequently used to define Saltstone Special Analysis base cases.

  5. Type A verification report for the high flux beam reactor stack and grounds, Brookhaven National Laboratory, Upton, New York

    SciTech Connect (OSTI)

    Harpenau, Evan M.

    2012-01-13

    The U.S. Department of Energy (DOE) Order 458.1 requires independent verification (IV) of DOE cleanup projects (DOE 2011). The Oak Ridge Institute for Science and Education (ORISE) has been designated as the responsible organization for IV of the High Flux Beam Reactor (HFBR) Stack and Grounds area at Brookhaven National Laboratory (BNL) in Upton, New York. The IV evaluation may consist of an in-process inspection with document and data reviews (Type A Verification) or a confirmatory survey of the site (Type B Verification). DOE and ORISE determined that a Type A verification of the documents and data for the HFBR Stack and Grounds: Survey Units (SU) 6, 7, and 8 was appropriate based on the initial survey unit classification, the walkover surveys, and the final analytical results provided by the Brookhaven Science Associates (BSA). The HFBR Stack and Grounds surveys began in June 2011 and were completed in September 2011. Survey activities by BSA included gamma walkover scans and sampling of the as-left soils in accordance with the BSA Work Procedure (BNL 2010a). The Field Sampling Plan - Stack and Remaining HFBR Outside Areas (FSP) stated that gamma walk-over surveys would be conducted with a bare sodium iodide (NaI) detector, and a collimated detector would be used to check areas with elevated count rates to locate the source of the high readings (BNL 2010b). BSA used the Mult- Agency Radiation Survey and Site Investigation Manual (MARSSIM) principles for determining the classifications of each survey unit. Therefore, SUs 6 and 7 were identified as Class 1 and SU 8 was deemed Class 2 (BNL 2010b). Gamma walkover surveys of SUs 6, 7, and 8 were completed using a 2?2 NaI detector coupled to a data-logger with a global positioning system (GPS). The 100% scan surveys conducted prior to the final status survey (FSS) sampling identified two general soil areas and two isolated soil locations with elevated radioactivity. The general areas of elevated activity identified

  6. Independent Oversight Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-12-21

    The order prescribes the requirements and responsibilities for the DOE Independent Oversight Program. Supersedes DOE O 227.1.

  7. ESPC ENABLE Measurement and Verification Protocol

    Broader source: Energy.gov [DOE]

    Document provides an overview of the Measurement and Verification (M&V) Protocol utilized within ENABLE energy savings performance contract projects.

  8. Headquarters Employment Verification | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Employment Verification Headquarters Employment Verification M&P Employees should contact Marilyn Samuels at 202-586-8571 for basic employment verification. S&E Employees should contact the Benefits Branch for basic employment verification. Requests should be faxed to 865-576-5050. If a fax is not available, please email requests to SESSCBenefits@hc.doe.gov This is for "is this person employed here?", or "how long has this person been employed?". There will be no

  9. Verification and validation benchmarks. (Technical Report) |...

    Office of Scientific and Technical Information (OSTI)

    Validation addresses the physics modeling accuracy of a computational simulation by comparing the computational results with experimental data. Code verification benchmarks and ...

  10. Superior Energy Performance Measurement and Verification Protocol...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Superior Energy Performance logo This Measurement and Verification Protocol for Industry defines the procedures that will be used to confirm conformance with the energy performance ...

  11. Verification and validation benchmarks. (Technical Report) |...

    Office of Scientific and Technical Information (OSTI)

    high-consequence fields, such as nuclear reactor safety, underground nuclear waste ... For example, the field of nuclear reactor safety has not focused on code verification ...

  12. Input apparatus for dynamic signature verification systems

    DOE Patents [OSTI]

    EerNisse, Errol P.; Land, Cecil E.; Snelling, Jay B.

    1978-01-01

    The disclosure relates to signature verification input apparatus comprising a writing instrument and platen containing piezoelectric transducers which generate signals in response to writing pressures.

  13. DOE Zero Energy Ready Home Verification...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Home Verification Summary DRAFT REMRate - Residential Energy Analysis and Rating Software ... Followed the DOE Zero Energy Ready Home Quality Management Guidelines X The buyer of this ...

  14. Why do verification and validation?

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Hu, Kenneth T.; Paez, Thomas L.

    2016-02-19

    In this discussion paper, we explore different ways to assess the value of verification and validation (V&V) of engineering models. We first present a literature review on the value of V&V and then use value chains and decision trees to show how value can be assessed from a decision maker's perspective. In this context, the value is what the decision maker is willing to pay for V&V analysis with the understanding that the V&V results are uncertain. As a result, the 2014 Sandia V&V Challenge Workshop is used to illustrate these ideas.

  15. VERIFICATION SURVEY OF PHASE I REMEDIAL ACTIONS ALBANY RESEARCH...

    Office of Legacy Management (LM)

    ... LABORATORY 1 LABORATORY 2 THORIUM- li RL i r o CRUSHER ROOM t E- ROOM REST rfffff ORE ROOM w ROOM REST ROOM | O R N 0 E NB vA CONTAMINATED L- AREA FEET 24 METERS ...

  16. Survey of Existing Tools for Formal Verification. (Technical...

    Office of Scientific and Technical Information (OSTI)

    Content: Close Send 0 pages in this document matching the terms "" Search For Terms: Enter terms in the toolbar above to search the full text of this document for pages...

  17. Oak Ridge Associated VERIFICATION SURVEY Universities OF THE

    Office of Legacy Management (LM)

    ... radioactive waste treatment facilities, turbine building, test and training building, and ... r , InIe no- LAY-DOWN AREA II <<. .PAD TURBINE DECK 1 |( ( AYDOChh 7 ( C ) pAi ...

  18. verification

    National Nuclear Security Administration (NNSA)

    %2A en NGSI Safeguards by Design http:nnsa.energy.govaboutusourprogramsdnnnissafeguardssbd

  19. verification

    National Nuclear Security Administration (NNSA)

    information with the need to obtain enough data to inform the process.

    Michele Smith, Deputy Director for the Warhead Dismantlement Transparency Program within NNSA's...

  20. The monitoring and verification of nuclear weapons

    SciTech Connect (OSTI)

    Garwin, Richard L.

    2014-05-09

    This paper partially reviews and updates the potential for monitoring and verification of nuclear weapons, including verification of their destruction. Cooperative monitoring with templates of the gamma-ray spectrum are an important tool, dependent on the use of information barriers.

  1. Declaration of Construction Completion and Verification of Readiness...

    Energy Savers [EERE]

    Declaration of Construction Completion and Verification of Readiness to Test Declaration of Construction Completion and Verification of Readiness to Test Salt Waste Processing ...

  2. Numerical Verification of Bounce Harmonic Resonances in Neoclassical

    Office of Scientific and Technical Information (OSTI)

    for Tokamaks Kimin Kim, Jong-Kyu Park and Allen H. Boozer 70 PLASMA PHYSICS AND FUSION TECHNOLOGY Tokamaks, Numerical Verification Tokamaks, Numerical Verification This...

  3. Verification of J-integral capability in Sierra Mechanics. (Technical...

    Office of Scientific and Technical Information (OSTI)

    Verification of J-integral capability in Sierra Mechanics. Citation Details In-Document Search Title: Verification of J-integral capability in Sierra Mechanics. You are...

  4. California ARB Verification Testing of the CBSTM Soot Filter...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    California ARB Verification Testing of the CBSTM Soot Filter for Stationary Diesel Applications California ARB Verification Testing of the CBSTM Soot Filter for Stationary Diesel ...

  5. CARB Verification of Catalyzed Diesel Particulate Filters for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CARB Verification of Catalyzed Diesel Particulate Filters for Emergency Generator Sets CARB Verification of Catalyzed Diesel Particulate Filters for Emergency Generator Sets 2005 ...

  6. ENERGY STAR Appliance Verification Testing - Pilot Program Summary...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ENERGY STAR Appliance Verification Testing - Pilot Program Summary Report dated February 3, 2012 ENERGY STAR Appliance Verification Testing - Pilot Program Summary Report dated ...

  7. FAQ's for: ENERGY STAR Verification Testing Pilot Program dated...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FAQ's for: ENERGY STAR Verification Testing Pilot Program dated December 2010 FAQ's for: ENERGY STAR Verification Testing Pilot Program dated December 2010 This document is the ...

  8. Independent Statistics & Analysis

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    monthly data for smaller electric power plants that are excluded from the monthly filing ... independent power producers, and electric utility combined heat and power plants. ...

  9. Independent Oversight Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-08-30

    The order prescribes the requirements and responsibilities for the DOE Independent Oversight Program. Cancels DOE O 470.2B. Superseded by DOE O 227.1A.

  10. 1000 Independence Avenue, SW

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    office of small & disadvantaged business utilization 1000 Independence Avenue, SW ... and Disposal office of small & disadvantaged business utilization what does doe purchase? ...

  11. Independent Statistics & Analysis

    U.S. Energy Information Administration (EIA) Indexed Site

    October 2014 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 Quarterly Coal Distribution Report April - June 2014 This report was...

  12. Approach to IAEA material-balance verification at the Portsmouth Gas Centrifuge Enrichment Plant

    SciTech Connect (OSTI)

    Gordon, D.M.; Sanborn, J.B.; Younkin, J.M.; DeVito, V.J.

    1983-01-01

    This paper describes a potential approach by which the International Atomic Energy Agency (IAEA) might verify the nuclear-material balance at the Portsmouth Gas Centrifuge Enrichment Plant (GCEP). The strategy makes use of the attributes and variables measurement verification approach, whereby the IAEA would perform independent measurements on a randomly selected subset of the items comprising the U-235 flows and inventories at the plant. In addition, the MUF-D statistic is used as the test statistic for the detection of diversion. The paper includes descriptions of the potential verification activities, as well as calculations of: (1) attributes and variables sample sizes for the various strata, (2) standard deviations of the relevant test statistics, and (3) the detection sensitivity which the IAEA might achieve by this verification strategy at GCEP.

  13. DOE Zero Energy Ready Home Verification | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Verification DOE Zero Energy Ready Home Verification DOE Zero Energy Ready Homes Verification, a publication of the U.S. Department of Energy Zero Energy Ready Homes program. DOE Zero Energy Ready Home - Verification Report.pdf (47.44 KB) More Documents & Publications The Appraisal Process: Be Your Own Advocate Prescriptive Path compliance form ZERO ENERGY READY HOME UPDATE NEWSLETTER AUGUST 2014

  14. Data Machine Independence

    Energy Science and Technology Software Center (OSTI)

    1994-12-30

    Data-machine independence achieved by using four technologies (ASN.1, XDR, SDS, and ZEBRA) has been evaluated by encoding two different applications in each of the above; and their results compared against the standard programming method using C.

  15. Independent Statistics & Analysis

    U.S. Energy Information Administration (EIA) Indexed Site

    August 2016 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 Quarterly Coal Distribution Report October - December 2015 This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this report therefore

  16. Independent Statistics & Analysis

    U.S. Energy Information Administration (EIA) Indexed Site

    Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 Quarterly Coal Report (Abbreviated) January - March 2016 June 2016 This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this report therefore should

  17. Evaluation, Measurement, and Verification Overview | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This document provides an overview and definition of EM&V. PDF icon What is EMV? More ... and Verification Plan for Your Energy Efficiency ProjectProgram Developing an ...

  18. Assessment of Advanced Measurement and Verification Methods ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (M&V 2.0) Assessment of Advanced Measurement and Verification Methods (M&V 2.0) Automated M&V from Noesis Automated M&V from Noesis Lead Performer: Lawrence Berkeley ...

  19. Verification & Validation | National Nuclear Security Administration |

    National Nuclear Security Administration (NNSA)

    (NNSA) Verification & Validation Verification and Validation (V&V) provides assurance that the models in the codes produce mathematically correct answers and that the answers reflect physical reality. The V&V subprogram funds the critical skills needed to apply systematic measurement, documentation, and demonstration of the ability of the models and codes to predict physical behavior. The V&V subprogram is developing and implementing Uncertainty Quantification (UQ)

  20. Environmental Technology Verification of Mobile Sources Control

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technologies | Department of Energy Environmental Technology Verification of Mobile Sources Control Technologies Environmental Technology Verification of Mobile Sources Control Technologies 2005 Diesel Engine Emissions Reduction (DEER) Conference Presentations and Posters 2005_deer_elion.pdf (158.94 KB) More Documents & Publications EPA Mobile Source Rule Update Efficient Use of Natural Gas Based Fuels in Heavy-Duty Engines The California Demonstration Program for Control of PM from

  1. A Runtime Verification Framework for Control System Simulation

    SciTech Connect (OSTI)

    Ciraci, Selim; Fuller, Jason C.; Daily, Jeffrey A.; Makhmalbaf, Atefe; Callahan, Charles D.

    2014-08-02

    n a standard workflow for the validation of a control system, the control system is implemented as an extension to a simulator. Such simulators are complex software systems, and engineers may unknowingly violate constraints a simulator places on extensions. As such, errors may be introduced in the implementation of either the control system or the simulator leading to invalid simulation results. This paper presents a novel runtime verification approach for verifying control system implementations within simulators. The major contribution of the approach is the two-tier specification process. In the first tier, engineers model constraints using a domain-specific language tailored to modeling a controllers response to changes in its input. The language is high-level and effectively hides the implementation details of the simulator, allowing engineers to specify design-level constraints independent of low-level simulator interfaces. In the second tier, simulator developers provide mapping rules for mapping design-level constraints to the implementation of the simulator. Using the rules, an automated tool transforms the design-level specifications into simulator-specific runtime verification specifications and generates monitoring code which is injected into the implementation of the simulator. During simulation, these monitors observe the input and output variables of the control system and report changes to the verifier. The verifier checks whether these changes follow the constraints of the control system. We describe application of this approach to the verification of the constraints of an HVAC control system implemented with the power grid simulator GridLAB-D.

  2. Independent technical review, handbook

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    Purpose Provide an independent engineering review of the major projects being funded by the Department of Energy, Office of Environmental Restoration and Waste Management. The independent engineering review will address questions of whether the engineering practice is sufficiently developed to a point where a major project can be executed without significant technical problems. The independent review will focus on questions related to: (1) Adequacy of development of the technical base of understanding; (2) Status of development and availability of technology among the various alternatives; (3) Status and availability of the industrial infrastructure to support project design, equipment fabrication, facility construction, and process and program/project operation; (4) Adequacy of the design effort to provide a sound foundation to support execution of project; (5) Ability of the organization to fully integrate the system, and direct, manage, and control the execution of a complex major project.

  3. Verification of operating software for cooperative monitoring applications

    SciTech Connect (OSTI)

    Tolk, K.M.; Rembold, R.K.

    1997-08-01

    Monitoring agencies often use computer based equipment to control instruments and to collect data at sites that are being monitored under international safeguards or other cooperative monitoring agreements. In order for this data to be used as an independent verification of data supplied by the host at the facility, the software used must be trusted by the monitoring agency. The monitoring party must be sure that the software has not be altered to give results that could lead to erroneous conclusions about nuclear materials inventories or other operating conditions at the site. The host might also want to verify that the software being used is the software that has been previously inspected in order to be assured that only data that is allowed under the agreement is being collected. A description of a method to provide this verification using keyed has functions and how the proposed method overcomes possible vulnerabilities in methods currently in use such as loading the software from trusted disks is presented. The use of public key data authentication for this purpose is also discussed.

  4. TRU waste certification and TRUPACT-2 payload verification

    SciTech Connect (OSTI)

    Hunter, E.K. . Waste Isolation Pilot Plant Project Office); Johnson, J.E. . Waste Isolation Div.)

    1990-01-01

    The Waste Isolation Pilot Plant (WIPP) established a policy that requires each waste shipper to verify that all waste shipments meet the requirements of the Waste Acceptance Criteria (WAC) prior to being shipped. This verification provides assurance that transuranic (TRU) wastes meet the criteria while still retained in a facility where discrepancies can be immediately corrected. Each Department of Energy (DOE) TRU waste facility planning to ship waste to the Waste Isolation Pilot Plant (WIPP) is required to develop and implement a specific program including Quality Assurance (QA) provisions to verify that waste is in full compliance with WIPP's WAC. This program is audited by a composite DOE and contractor audit team prior to granting the facility permission to certify waste. During interaction with the Nuclear Regulatory Commission (NRC) on payload verification for shipping in TRUPACT-II, a similar system was established by DOE. The TRUPACT-II Safety Analysis Report (SAR) contains the technical requirements and physical and chemical limits that payloads must meet (like the WAC). All shippers must plan and implement a payload control program including independent QA provisions. A similar composite audit team will conduct preshipment audits, frequent subsequent audits, and operations inspections to verify that all TRU waste shipments in TRUPACT-II meet the requirements of the Certificate of Compliance issued by the NRC which invokes the SAR requirements. 1 fig.

  5. An evaluation of the management system verification pilot at Hanford

    SciTech Connect (OSTI)

    BRIGGS, C.R.

    1998-11-12

    The Chemical Management System (CMS), currently under development at Hanford, was used as the ''test program'' for pilot testing the value added aspects of the Chemical Manufacturers Association's (CMA) Management Systems Verification (MSV) process. The MSV process, which was developed by CMA's member chemical companies specifically as a tool to assist in the continuous improvement of environment, safety and health (ESH) performance, represents a commercial sector ''best practice'' for evaluating ESH management systems. The primary purpose of Hanford's MSV Pilot was to evaluate the applicability and utility of the MSV process in the Department of Energy (DOE) environment. However, because the Integrated Safety Management System (ISMS) is the framework for ESH management at Hanford and at all DOE sites, the pilot specifically considered the MSV process in the context of a possible future adjunct to Integrated Safety Management System Verification (ISMSV) efforts at Hanford and elsewhere within the DOE complex. The pilot involved the conduct of two-hour interviews with four separate panels of individuals with functional responsibilities related to the CMS including the Department of Energy Richland Operations (DOE-RL), Fluor Daniel Hanford (FDH) and FDH's major subcontractors (MSCS). A semi-structured interview process was employed by the team of three ''verifiers'' who directed open-ended questions to the panels regarding the development, integration and effectiveness of management systems necessary to ensure the sustainability of the CMS effort. An ''MSV Pilot Effectiveness Survey'' also was completed by each panel participant immediately following the interview.

  6. Monitoring and verification R&D

    SciTech Connect (OSTI)

    Pilat, Joseph F; Budlong - Sylvester, Kory W; Fearey, Bryan L

    2011-01-01

    The 2010 Nuclear Posture Review (NPR) report outlined the Administration's approach to promoting the agenda put forward by President Obama in Prague on April 5, 2009. The NPR calls for a national monitoring and verification R&D program to meet future challenges arising from the Administration's nonproliferation, arms control and disarmament agenda. Verification of a follow-on to New START could have to address warheads and possibly components along with delivery capabilities. Deeper cuts and disarmament would need to address all of these elements along with nuclear weapon testing, nuclear material and weapon production facilities, virtual capabilities from old weapon and existing energy programs and undeclared capabilities. We only know how to address some elements of these challenges today, and the requirements may be more rigorous in the context of deeper cuts as well as disarmament. Moreover, there is a critical need for multiple options to sensitive problems and to address other challenges. There will be other verification challenges in a world of deeper cuts and disarmament, some of which we are already facing. At some point, if the reductions process is progressing, uncertainties about past nuclear materials and weapons production will have to be addressed. IAEA safeguards will need to continue to evolve to meet current and future challenges, and to take advantage of new technologies and approaches. Transparency/verification of nuclear and dual-use exports will also have to be addressed, and there will be a need to make nonproliferation measures more watertight and transparent. In this context, and recognizing we will face all of these challenges even if disarmament is not achieved, this paper will explore possible agreements and arrangements; verification challenges; gaps in monitoring and verification technologies and approaches; and the R&D required to address these gaps and other monitoring and verification challenges.

  7. Shell Element Verification & Regression Problems for DYNA3D

    SciTech Connect (OSTI)

    Zywicz, E

    2008-02-01

    A series of quasi-static regression/verification problems were developed for the triangular and quadrilateral shell element formulations contained in Lawrence Livermore National Laboratory's explicit finite element program DYNA3D. Each regression problem imposes both displacement- and force-type boundary conditions to probe the five independent nodal degrees of freedom employed in the targeted formulation. When applicable, the finite element results are compared with small-strain linear-elastic closed-form reference solutions to verify select aspects of the formulations implementation. Although all problems in the suite depict the same geometry, material behavior, and loading conditions, each problem represents a unique combination of shell formulation, stabilization method, and integration rule. Collectively, the thirty-six new regression problems in the test suite cover nine different shell formulations, three hourglass stabilization methods, and three families of through-thickness integration rules.

  8. Cosmology from Cosmic Shear with DES Science Verification Data

    SciTech Connect (OSTI)

    Abbott, T.

    2015-07-20

    We present the first constraints on cosmology from the Dark Energy Survey (DES), using weak lensing measurements from the preliminary Science Verification (SV) data. We use 139 square degrees of SV data, which is less than 3% of the full DES survey area. Using cosmic shear 2-point measurements over three redshift bins we find ?8(m=0.3)0.5 = 0:81 0:06 (68% confidence), after marginalising over 7 systematics parameters and 3 other cosmological parameters. Furthermore, we examine the robustness of our results to the choice of data vector and systematics assumed, and find them to be stable. About 20% of our error bar comes from marginalising over shear and photometric redshift calibration uncertainties. The current state-of-the-art cosmic shear measurements from CFHTLenS are mildly discrepant with the cosmological constraints from Planck CMB data. Our results are consistent with both datasets. Our uncertainties are ~30% larger than those from CFHTLenS when we carry out a comparable analysis of the two datasets, which we attribute largely to the lower number density of our shear catalogue. We investigate constraints on dark energy and find that, with this small fraction of the full survey, the DES SV constraints make negligible impact on the Planck constraints. The moderate disagreement between the CFHTLenS and Planck values of ?8(?m=0.3)0.5 is present regardless of the value of w.

  9. MACCS2 development and verification efforts

    SciTech Connect (OSTI)

    Young, M.; Chanin, D.

    1997-03-01

    MACCS2 represents a major enhancement of the capabilities of its predecessor MACCS, the MELCOR Accident Consequence Code System. MACCS, released in 1987, was developed to estimate the potential impacts to the surrounding public of severe accidents at nuclear power plants. The principal phenomena considered in MACCS/MACCS2 are atmospheric transport and deposition under time-variant meteorology, short-term and long-term mitigative actions and exposure pathways, deterministic and stochastic health effects, and economic costs. MACCS2 was developed as a general-purpose analytical tool applicable to diverse reactor and nonreactor facilities. The MACCS2 package includes three primary enhancements: (1) a more flexible emergency response model, (2) an expanded library of radionuclides, and (3) a semidynamic food-chain model. In addition, errors that had been identified in MACCS version1.5.11.1 were corrected, including an error that prevented the code from providing intermediate-phase results. MACCS2 version 1.10 beta test was released to the beta-test group in May, 1995. In addition, the University of New Mexico (UNM) has completed an independent verification study of the code package. Since the beta-test release of MACCS2 version 1.10, a number of minor errors have been identified and corrected, and a number of enhancements have been added to the code package. The code enhancements added since the beta-test release of version 1.10 include: (1) an option to allow the user to input the {sigma}{sub y} and {sigma}{sub z} plume expansion parameters in a table-lookup form for incremental downwind distances, (2) an option to define different initial dimensions for up to four segments of a release, (3) an enhancement to the COMIDA2 food-chain model preprocessor to allow the user to supply externally calculated tables of tritium food-chain dose per unit deposition on farmland to support analyses of tritium releases, and (4) the capability to calculate direction-dependent doses.

  10. Independent Cost Estimate (ICE)

    Broader source: Energy.gov [DOE]

    Independent Cost Estimate (ICE). On August 8-12, the Office of Project Management Oversight and Assessments (PM) will conduct an ICE on the NNSA Albuquerque Complex Project (NACP) at Albuquerque, NM. This estimate will support the Critical Decision (CD) for establishing the performance baseline and approval to start construction (CD-2/3). This project is at CD-1, with a total project cost range of $183M to $251M.

  11. 1000 Independence Avenue, SW

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    office of small & disadvantaged business utilization 1000 Independence Avenue, SW Washington, DC 20585 202.586.7377 www.smallbusiness.energy.gov the department purchases a wide variety of goods and services, including, but not limited to: 202.586.7377 www.smallbusiness.energy.gov DOE/SB-0002 * Remediation * Facility Management * Construction * R&D * Management/Scientific Consultation and Analysis * Administrative Services * IT and Data Processing * Security * Engineering * Waste

  12. Land Ice Verification and Validation Kit

    Energy Science and Technology Software Center (OSTI)

    2015-07-15

    To address a pressing need to better understand the behavior and complex interaction of ice sheets within the global Earth system, significant development of continental-scale, dynamical ice-sheet models is underway. The associated verification and validation process of these models is being coordinated through a new, robust, python-based extensible software package, the Land Ice Verification and Validation toolkit (LIVV). This release provides robust and automated verification and a performance evaluation on LCF platforms. The performance V&Vmore » involves a comprehensive comparison of model performance relative to expected behavior on a given computing platform. LIVV operates on a set of benchmark and test data, and provides comparisons for a suite of community prioritized tests, including configuration and parameter variations, bit-4-bit evaluation, and plots of tests where differences occur.« less

  13. Land Ice Verification and Validation Kit

    SciTech Connect (OSTI)

    2015-07-15

    To address a pressing need to better understand the behavior and complex interaction of ice sheets within the global Earth system, significant development of continental-scale, dynamical ice-sheet models is underway. The associated verification and validation process of these models is being coordinated through a new, robust, python-based extensible software package, the Land Ice Verification and Validation toolkit (LIVV). This release provides robust and automated verification and a performance evaluation on LCF platforms. The performance V&V involves a comprehensive comparison of model performance relative to expected behavior on a given computing platform. LIVV operates on a set of benchmark and test data, and provides comparisons for a suite of community prioritized tests, including configuration and parameter variations, bit-4-bit evaluation, and plots of tests where differences occur.

  14. Active alignment/contact verification system

    DOE Patents [OSTI]

    Greenbaum, William M.

    2000-01-01

    A system involving an active (i.e. electrical) technique for the verification of: 1) close tolerance mechanical alignment between two component, and 2) electrical contact between mating through an elastomeric interface. For example, the two components may be an alumina carrier and a printed circuit board, two mating parts that are extremely small, high density parts and require alignment within a fraction of a mil, as well as a specified interface point of engagement between the parts. The system comprises pairs of conductive structures defined in the surfaces layers of the alumina carrier and the printed circuit board, for example. The first pair of conductive structures relate to item (1) above and permit alignment verification between mating parts. The second pair of conductive structures relate to item (2) above and permit verification of electrical contact between mating parts.

  15. M&V Guidelines: Measurement and Verification for Federal Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    M&V Guidelines: Measurement and Verification for Federal Energy Projects (Version 4.0) M&V Guidelines: Measurement and Verification for Federal Energy Projects (Version 4.0) ...

  16. A golden anniversary for space-based treaty verification

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A golden anniversary for space-based treaty verification Fifty years ago this month, LANL ... Los Alamos is commemorating 50 years of space-based arms treaty verification efforts this ...

  17. M&V Guidelines: Measurement and Verification for Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    You are here Home M&V Guidelines: Measurement and Verification for Performance-Based Contracts (Version 4.0) M&V Guidelines: Measurement and Verification for Performance-Based ...

  18. DOE-STD-1036-93; Guide to Good Practices for Independent Verification

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... of manual valves, motor-operated and air-operated ... fuses, availability of control power, accuracy of calculations, etc. Techniques may involve direct ...

  19. AHAM Letter Acknowledging DOE Letter on Verification Program | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Letter Acknowledging DOE Letter on Verification Program AHAM Letter Acknowledging DOE Letter on Verification Program This document is a response to the letter dated April 26, 2013, in which DOE adopted a new policy regarding DOE ENERGY STAR verification testing of models that are part of the AHAM verification program for clothes washers, dishwashers, and residential refrigerator/freezers. aham_response_doe_letter.pdf (80.05 KB) More Documents & Publications This letter is to

  20. Example Measurement and Verification Plan for an ESPC Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    Report features a comprehensive measurement and verification (M&V) plan for a fictitious energy savings performance contract (ESPC) project.

  1. Supplement No. 2 to the FUSRAP Summary Protocol - Verification and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Certification Protocol | Department of Energy 2 to the FUSRAP Summary Protocol - Verification and Certification Protocol Supplement No. 2 to the FUSRAP Summary Protocol - Verification and Certification Protocol Supplement No. 2 to the FUSRAP Summary Protocol - Verification and Certification Protocol (November 1985, Rev. 1) Supplement No. 2 to the FUSRAP Summary Protocol - Verification and Certification Protocol (November 1985, Rev. 1) (1.14 MB) More Documents & Publications Supplement

  2. Invited book review for AIAA Journal of verification of computer...

    Office of Scientific and Technical Information (OSTI)

    Country of Publication: United States Language: English Subject: 99 GENERAL AND MISCELLANEOUSMATHEMATICS, COMPUTING, AND INFORMATION SCIENCE; COMPUTER CODES; VERIFICATION; SANDIA ...

  3. Approach to IAEA verification of the nuclear-material balance at the Portsmouth Gas Centrifuge Enrichment Plant (GCEP)

    SciTech Connect (OSTI)

    Gordon, D.M.; Sanborn, J.B.; Younkin, J.M.; DeVito, V.J.

    1982-01-01

    This paper describes a potential approach by which the International Atomic Energy Agency (IAEA) might verify the nuclear-material balance at the Portsmouth Gas Centrifuge Enrichment Plant (GCEP), should that plant be placed under IAEA safeguards. The strategy makes use of the attributes and variables measurement verification approach, whereby the IAEA would perform independent measurements on a randomly selected subset of the items comprising the U-235 flows and inventories at the plant. In addition, the MUF-D statistic is used as the test statistics for the detection of diversion. The paper includes descriptions of the potential verification activities, as well as calculations of (a) attributes and variables sample sizes for the various strata, (b) standard deviations of the relevant test statistics, and (c) the sensitivity for detection of diversion which the IAEA might achieve by this verification strategy at GCEP.

  4. Nuclear Verification | National Nuclear Security Administration | (NNSA)

    National Nuclear Security Administration (NNSA)

    Control Nuclear Verification Challenge: Maintain the U.S. ability to monitor and verify nuclear reduction agreements and detect violations of treaties and other nuclear nonproliferation commitments. Solution: Develop and deploy measures to ensure verifiable compliance with treaties and other international agreements, implement regimes to reduce nuclear weapons, and detect and dismantle undeclared nuclear programs. Specific subprogram activities include: Implementing current and developing future

  5. treaty verification | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    treaty verification Global Material Security The mission of the Office of Global Material Security (GMS) is to help partner countries secure and account for nuclear weapons, weapons-useable nuclear and radiological materials, as well as to build capacity to deter, detect and interdict the illicit trafficking of such materials. GMS achieves

  6. RELAP-7 SOFTWARE VERIFICATION AND VALIDATION PLAN

    SciTech Connect (OSTI)

    Smith, Curtis L; Choi, Yong-Joon; Zou, Ling

    2014-09-01

    This INL plan comprehensively describes the software for RELAP-7 and documents the software, interface, and software design requirements for the application. The plan also describes the testing-based software verification and validation (SV&V) process—a set of specially designed software models used to test RELAP-7.

  7. Frame independent cosmological perturbations

    SciTech Connect (OSTI)

    Prokopec, Tomislav; Weenink, Jan E-mail: j.g.weenink@uu.nl

    2013-09-01

    We compute the third order gauge invariant action for scalar-graviton interactions in the Jordan frame. We demonstrate that the gauge invariant action for scalar and tensor perturbations on one physical hypersurface only differs from that on another physical hypersurface via terms proportional to the equation of motion and boundary terms, such that the evolution of non-Gaussianity may be called unique. Moreover, we demonstrate that the gauge invariant curvature perturbation and graviton on uniform field hypersurfaces in the Jordan frame are equal to their counterparts in the Einstein frame. These frame independent perturbations are therefore particularly useful in relating results in different frames at the perturbative level. On the other hand, the field perturbation and graviton on uniform curvature hypersurfaces in the Jordan and Einstein frame are non-linearly related, as are their corresponding actions and n-point functions.

  8. The AdaptiV Approach to Verification of Adaptive Systems

    SciTech Connect (OSTI)

    Rouff, Christopher; Buskens, Richard; Pullum, Laura L; Cui, Xiaohui; Hinchey, Mike

    2012-01-01

    Adaptive systems are critical for future space and other unmanned and intelligent systems. Verification of these systems is also critical for their use in systems with potential harm to human life or with large financial investments. Due to their nondeterministic nature and extremely large state space, current methods for verification of software systems are not adequate to provide a high level of assurance. The combination of stabilization science, high performance computing simulations, compositional verification and traditional verification techniques, plus operational monitors, provides a complete approach to verification and deployment of adaptive systems that has not been used before. This paper gives an overview of this approach.

  9. Passive Tomography for Spent Fuel Verification: Analysis Framework and Instrument Design Study

    SciTech Connect (OSTI)

    White, Timothy A.; Svard, Staffan J.; Smith, Leon E.; Mozin, Vladimir V.; Jansson, Peter; Davour, Anna; Grape, Sophie; Trellue, H.; Deshmukh, Nikhil S.; Wittman, Richard S.; Honkamaa, Tapani; Vaccaro, Stefano; Ely, James

    2015-05-18

    The potential for gamma emission tomography (GET) to detect partial defects within a spent nuclear fuel assembly is being assessed through a collaboration of Support Programs to the International Atomic Energy Agency (IAEA). In the first phase of this study, two safeguards verification objectives have been identified. The first is the independent determination of the number of active pins that are present in the assembly, in the absence of a priori information. The second objective is to provide quantitative measures of pin-by-pin properties, e.g. activity of key isotopes or pin attributes such as cooling time and relative burnup, for the detection of anomalies and/or verification of operator-declared data. The efficacy of GET to meet these two verification objectives will be evaluated across a range of fuel types, burnups, and cooling times, and with a target interrogation time of less than 60 minutes. The evaluation of GET viability for safeguards applications is founded on a modelling and analysis framework applied to existing and emerging GET instrument designs. Monte Carlo models of different fuel types are used to produce simulated tomographer responses to large populations of “virtual” fuel assemblies. Instrument response data are processed by a variety of tomographic-reconstruction and image-processing methods, and scoring metrics specific to each of the verification objectives are defined and used to evaluate the performance of the methods. This paper will provide a description of the analysis framework and evaluation metrics, example performance-prediction results, and describe the design of a “universal” GET instrument intended to support the full range of verification scenarios envisioned by the IAEA.

  10. Verification of EPA's ''Preliminary Remediation Goals for radionuclides'' (PRG) electronic calculator

    SciTech Connect (OSTI)

    Jannik, Tim; Stagich, Brooke

    2015-08-28

    The U.S. Environmental Protection Agency (EPA) requested an external, independent verification study of their updated “Preliminary Remediation Goals for Radionuclides” (PRG) electronic calculator. The calculator provides PRGs for radionuclides that are used as a screening tool at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and Resource Conservation and Recovery Act (RCRA) sites. These risk-based PRGs establish concentration limits under specific exposure scenarios. The purpose of this verification study is to determine that the calculator has no inherit numerical problems with obtaining solutions as well as to ensure that the equations are programmed correctly. There are 167 equations used in the calculator. To verify the calculator, all equations for each of seven receptor types (resident, construction worker, outdoor and indoor worker, recreator, farmer, and composite worker) were hand calculated using the default parameters. The same four radionuclides (Am-241, Co-60, H-3, and Pu-238) were used for each calculation for consistency throughout.

  11. The new geospatial tools: global transparency enhancing safeguards verification

    SciTech Connect (OSTI)

    Pabian, Frank Vincent

    2010-09-16

    This paper focuses on the importance and potential role of the new, freely available, geospatial tools for enhancing IAEA safeguards and how, together with commercial satellite imagery, they can be used to promote 'all-source synergy'. As additional 'open sources', these new geospatial tools have heralded a new era of 'global transparency' and they can be used to substantially augment existing information-driven safeguards gathering techniques, procedures, and analyses in the remote detection of undeclared facilities, as well as support ongoing monitoring and verification of various treaty (e.g., NPT, FMCT) relevant activities and programs. As an illustration of how these new geospatial tools may be applied, an original exemplar case study provides how it is possible to derive value-added follow-up information on some recent public media reporting of a former clandestine underground plutonium production complex (now being converted to a 'Tourist Attraction' given the site's abandonment by China in the early 1980s). That open source media reporting, when combined with subsequent commentary found in various Internet-based Blogs and Wikis, led to independent verification of the reporting with additional ground truth via 'crowdsourcing' (tourist photos as found on 'social networking' venues like Google Earth's Panoramio layer and Twitter). Confirmation of the precise geospatial location of the site (along with a more complete facility characterization incorporating 3-D Modeling and visualization) was only made possible following the acquisition of higher resolution commercial satellite imagery that could be correlated with the reporting, ground photos, and an interior diagram, through original imagery analysis of the overhead imagery.

  12. Independent Oversight Review, Argonne National Laboratory - November...

    Broader source: Energy.gov (indexed) [DOE]

    Office of Health, Safety and Security. The review was carried out within the broader context of an ongoing program of assessments of the execution of implementation verification...

  13. Systems Approach to Arms Control Verification

    SciTech Connect (OSTI)

    Allen, K; Neimeyer, I; Listner, C; Stein, G; Chen, C; Dreicer, M

    2015-05-15

    Using the decades of experience of developing concepts and technologies for verifying bilateral and multilateral arms control agreements, a broad conceptual systems approach is being developed that takes into account varying levels of information and risk. The IAEA has already demonstrated the applicability of a systems approach by implementing safeguards at the State level, with acquisition path analysis as the key element. In order to test whether such an approach could also be implemented for arms control verification, an exercise was conducted in November 2014 at the JRC ITU Ispra. Based on the scenario of a hypothetical treaty between two model nuclear weapons states aimed at capping their nuclear arsenals at existing levels, the goal of this exercise was to explore how to use acquisition path analysis in an arms control context. Our contribution will present the scenario, objectives and results of this exercise, and attempt to define future workshops aimed at further developing verification measures that will deter or detect treaty violations.

  14. NGSI: IAEA Verification of UF6 Cylinders

    SciTech Connect (OSTI)

    Curtis, Michael M.

    2012-06-05

    The International Atomic Energy Agency (IAEA) is often ignorant of the location of declared, uranium hexafluoride (UF6) cylinders following verification, because cylinders are not typically tracked onsite or off. This paper will assess various methods the IAEA uses to verify cylinder gross defects, and how the task could be ameliorated through the use of improved identification and monitoring. The assessment will be restricted to current verification methods together with one that has been applied on a trial basis—short-notice random inspections coupled with mailbox declarations. This paper is part of the NNSA Office of Nonproliferation and International Security’s Next Generation Safeguards Initiative (NGSI) program to investigate the concept of a global monitoring scheme that uniquely identifies and tracks UF6 cylinders.

  15. DOE Zero Energy Ready Home Verification Summary

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Zero Energy Ready Home Verification Summary DRAFT REM/Rate - Residential Energy Analysis and Rating Software v14.5.1 This information does not constitute any warranty of energy cost or savings. © 1985-2014 Architectural Energy Corporation, Boulder, Colorado. Projected Rating: Based on Plans - Field Confirmation Required. Energy Performance House Type DOE Zero Energy Ready Home Builder Partner ID# Single-family detached 12345 Year built Square footage of Conditioned Space including Basement 2013

  16. TWRS system drawings and field verification

    SciTech Connect (OSTI)

    Shepard, D.G.

    1995-04-11

    The Configuration Management Program combines the TWRS Labeling and O and M drawing and drawing verification programs. The combined program will produce system drawings for systems that are normally operated or have maintenance performed on the system, label individual pieces of equipment for proper identification, even if system drawings are not warranted, and perform verification of drawings that are identified as essential in Tank Farm Essential Drawing Plans. During fiscal year 1994, work was begun to label Tank Farm components and provide user friendly system based drawings for Tank Waste Remediation System (TWRS) operations and maintenance. During the first half of fiscal 1995, the field verification program continued to convert TWRS drawings into CAD format and verify the accuracy based on visual inspections. During the remainder of fiscal year 1995 these efforts will be combined into a single program providing system based drawings and field verification of TWRS equipment and facilities. This combined program for TWRS will include all active systems for tank farms. Operations will determine the extent of drawing and labeling requirements for single shell tanks, i.e. the electrical distribution, HVAC, leak detection, and the radiation monitoring system. The tasks required to meet these objectives, include the following: identify system boundaries or scope for drawing being verified; label equipment/components in the process systems with a unique Equipment Identification Number (EIN) per the TWRS Data Standard; develop system drawings that are coordinated by ``smart`` drawing numbers and/or drawing references as identified on H-14-020000; develop a Master Equipment List (MEL) multi-user data base application which will contain key information about equipment identified in the field; and field verify and release TWRS Operation and Maintenance (O and M) drawings.

  17. Technical safety requirements control level verification

    SciTech Connect (OSTI)

    STEWART, J.L.

    1999-05-21

    A Technical Safety Requirement (TSR) control level verification process was developed for the Tank Waste Remediation System (TWRS) TSRs at the Hanford Site in Richland, WA, at the direction of the US. Department of Energy, Richland Operations Office (RL). The objective of the effort was to develop a process to ensure that the TWRS TSR controls are designated and managed at the appropriate levels as Safety Limits (SLs), Limiting Control Settings (LCSs), Limiting Conditions for Operation (LCOs), Administrative Controls (ACs), or Design Features. The TSR control level verification process was developed and implemented by a team of contractor personnel with the participation of Fluor Daniel Hanford, Inc. (FDH), the Project Hanford Management Contract (PHMC) integrating contractor, and RL representatives. The team was composed of individuals with the following experience base: nuclear safety analysis; licensing; nuclear industry and DOE-complex TSR preparation/review experience; tank farm operations; FDH policy and compliance; and RL-TWRS oversight. Each TSR control level designation was completed utilizing TSR control logic diagrams and TSR criteria checklists based on DOE Orders, Standards, Contractor TSR policy, and other guidance. The control logic diagrams and criteria checklists were reviewed and modified by team members during team meetings. The TSR control level verification process was used to systematically evaluate 12 LCOs, 22 AC programs, and approximately 100 program key elements identified in the TWRS TSR document. The verification of each TSR control required a team consensus. Based on the results of the process, refinements were identified and the TWRS TSRs were modified as appropriate. A final report documenting key assumptions and the control level designation for each TSR control was prepared and is maintained on file for future reference. The results of the process were used as a reference in the RL review of the final TWRS TSRs and control suite. RL

  18. Digital Surveying Directional Surveying Specialists | Open Energy...

    Open Energy Info (EERE)

    Surveying Specialists Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Digital Surveying Directional Surveying Specialists Author Directional Surveying...

  19. Thoughts on Verification of Nuclear Disarmament

    SciTech Connect (OSTI)

    Dunlop, W H

    2007-09-26

    It is my pleasure to be here to day to participate in this Conference. My thanks to the organizers for preparing such an interesting agenda on a very difficult topic. My effort in preparing my presentation was performed under the auspices of the U.S. Department of Energy by University of California, Lawrence Livermore National Laboratory under Contract W-7405-Eng-48. And as many of you know Lawrence Livermore National Laboratory is now, as of Oct 1st, under contract to the Lawrence Livermore National Security LLC. There has been a long history of how to view verification of arms control agreements. The basis for verification during the days of SALT was that verification would be based on each country's national technical means. For treaties dealing with strategic missiles this worked well as the individual items subject to verification were of such a size that they were visible by the National Technical Means available at the time. And it was felt that the counting of missiles and launchers could be verified by our National Technical Means. For nuclear testing treaties the use of seismic measurements developed into a capability that was reasonably robust for all but the smallest of nuclear tests. However, once we had the Threshold Test Ban Treaty, there was a significant problem in that the fidelity of the measurements were not sufficient to determine if a test was slightly above the 150 kt limit or slightly below the 150 kt limit. This led some in the US to believe that the Soviet Union was not living up to the TTBT agreement. An on-site verification protocol was negotiated in 1988 and 1989 that allowed the US to make hydrodynamic yield measurements on Soviet tests above 50 kt yield and regional seismic measurements on all tests above 35 kt of yield; and the Soviets to make the same type of measurements on US tests to ensure that they were not over 150 kt. These on-site measurements were considered reasonably intrusive. Again the measurement capability was not

  20. Independent Oversight Review, Los Alamos National Laboratory- July 2012

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of the Los Alamos National Laboratory Implementation Verification Review at Technical Area-55

  1. Independent Oversight Review, Oak Ridge National Laboratory- January 2013

    Broader source: Energy.gov [DOE]

    Review of the Oak Ridge National Laboratory High Flux Isotope Reactor Implementation Verification Review Processes

  2. Independent Oversight Review, DOE Nuclear Facilities- May 2013

    Broader source: Energy.gov [DOE]

    Lessons Learned from Targeted Reviews of Implementation Verification Review Processes at Department of Energy Nuclear Facilities

  3. Reviewing Measurement and Verification Plans for Federal ESPC Projects |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Reviewing Measurement and Verification Plans for Federal ESPC Projects Reviewing Measurement and Verification Plans for Federal ESPC Projects Document provides a framework for implementing uniform and consistent reviews of measurement and verification plans for federal energy savings performance contract (ESPC) projects. Download the review framework. (184.56 KB) More Documents & Publications Reviewing Post-Installation and Annual Reports for Federal ESPC Projects

  4. Evaluation, Measurement, and Verification of Energy Data | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Evaluation, Measurement, and Verification of Energy Data Evaluation, Measurement, and Verification of Energy Data Evaluation, measurement, and verification (EM&V) is the collection of methods and processes used to assess the performance of energy efficiency activities so planned results can be achieved with greater certainty and future activities can be more effective. The main objectives of an EM&V process are to assess the performance of an energy efficiency program or

  5. CARB Verification of Catalyzed Diesel Particulate Filters for Emergency

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Generator Sets | Department of Energy CARB Verification of Catalyzed Diesel Particulate Filters for Emergency Generator Sets CARB Verification of Catalyzed Diesel Particulate Filters for Emergency Generator Sets 2005 Diesel Engine Emissions Reduction (DEER) Conference Presentations and Posters 2005_deer_huang.pdf (272.67 KB) More Documents & Publications Development and Applications of Catalyzed Diesel Particulate Filter California ARB Verification Testing of the CBSTM Soot Filter for

  6. Measurement and Verification of Low Income Energy Efficiency...

    Open Energy Info (EERE)

    URI: cleanenergysolutions.orgcontentmeasurement-and-verification-low-inco Language: English Policies: "Regulations,Financial Incentives" is not in the list of possible...

  7. ON THE EXPERIMENTAL VERIFICATION AND DETERMINATION OF PARAMETERS...

    Office of Scientific and Technical Information (OSTI)

    Title: ON THE EXPERIMENTAL VERIFICATION AND DETERMINATION OF PARAMETERS OF STOPPING-POWER THEORY Authors: Turner, J. E. Publication Date: 1964-01-01 OSTI Identifier: 4887408 Report ...

  8. NEMVP: North American energy measurement and verification protocol

    SciTech Connect (OSTI)

    1996-03-01

    This measurement and verification protocol discusses procedures that,when implemented, allow buyers, sellers, and financiers of energy projects to quantify energy conservation measure performance and savings.

  9. Verification of the Time Evolution of Cosmological Simulations...

    Office of Scientific and Technical Information (OSTI)

    Journal Article: Verification of the Time Evolution of Cosmological Simulations via Hypothesis-Driven Comparative and Quantitative Visualization Citation Details In-Document Search...

  10. Design, Installation, and Field Verification of Integrated Active...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cogeneration Package, 2008 Design, Installation, and Field Verification of Integrated Active Desiccant Hybrid Rooftop Systems Combined with a Natural Gas Driven Cogeneration ...

  11. DOE Verification Testing in Support of ENERGY STAR, April 22...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Comment submitted by Hoshizaki America, Inc. regarding the Energy Star Verification Testing Program Comment submitted by the North American Association of Food Equipment ...

  12. CHARPY IMPACT TEST RESULTS ON FIVE MAERIALS AND NIST VERIFICATION...

    Office of Scientific and Technical Information (OSTI)

    CHARPY IMPACT TEST RESULTS ON FIVE MAERIALS AND NIST VERIFICATION SPECIMENS USING ... Randy K, Nanstad' and Mikbail A. Sokolov' cHARPY IMPACT' TEST RESULTS ON FIVE MATERIALS ...

  13. Measurement and Verification for Federal Energy Savings Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Measurement and verification (M&V) activities help agencies confirm that legally and ... When done correctly, M&V: Appropriately allocates risks Reduces uncertainty of savings ...

  14. Measurement and Verification of Energy Savings and Performance...

    Office of Environmental Management (EM)

    Savings and Performance from Advanced Lighting Controls Measurement and Verification of Energy Savings and Performance from Advanced Lighting Controls This document provides a ...

  15. Verification of the Time Evolution of Cosmological Simulations...

    Office of Scientific and Technical Information (OSTI)

    Country of Publication: United States Language: English Subject: 71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSICS; ACCURACY; ALGORITHMS; COSMOLOGY; SIMULATION; VERIFICATION Word ...

  16. NNSA Begins New Campaign of Verification Experiments at Nevada...

    National Nuclear Security Administration (NNSA)

    NNSA Begins New Campaign of Verification Experiments at Nevada National Security Site May ... are being conducted at NNSA's Nevada National Security Site (NNSS) and will ...

  17. Energy Star Lighting Verification Program (Program for the Evaluation...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Energy Star Lighting Verification Program (Program for the Evaluation and Analysis of Residential Lighting) Citation Details In-Document Search Title: Energy Star ...

  18. Advanced Waste Management Now Available as Accredited SEP Verification...

    Office of Environmental Management (EM)

    Technical Assistance Superior Energy Performance Advanced Waste Management Now Available as Accredited SEP Verification Body Advanced Waste Management Now Available as ...

  19. Measurement and Verification for Federal Energy Savings Performance Contracts

    Broader source: Energy.gov [DOE]

    Measurement and verification (M&V) activities help agencies confirm that legally and contractually required savings guarantees are met in federal energy savings performance contracts (ESPCs).

  20. Measurement and Verification Plan and Savings Calculations Methods...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Methods Outline (IDIQ Attachment J-8) Measurement and Verification Plan and Savings Calculations Methods Outline (IDIQ Attachment J-8) Document outlines measurement and ...

  1. Verification of gyrokinetic microstability codes ?with an LHD configuration

    SciTech Connect (OSTI)

    Mikkelsen, D. R.; Nunami, M.; Watanabe, T. -H.; Sugama, H.; Tanaka, K.

    2014-11-01

    We extend previous benchmarks of the GS2 and GKV-X codes to verify their algorithms for solving the gyrokinetic Vlasov-Poisson equations for plasma microturbulence. Code benchmarks are the most complete way of verifying the correctness of implementations for the solution of mathematical models for complex physical processes such as those studied here. The linear stability calculations reported here are based on the plasma conditions of an ion-ITB plasma in the LHD configuration. The plasma parameters and the magnetic geometry differ from previous benchmarks involving these codes. We find excellent agreement between the independently written pre-processors that calculate the geometrical coefficients used in the gyrokinetic equations. Grid convergence tests are used to establish the resolution and domain size needed to obtain converged linear stability results. The agreement of the frequencies, growth rates and eigenfunctions in the benchmarks reported here provides additional verification that the algorithms used by the GS2 and GKV-X codes are correctly finding the linear eigenvalues and eigenfunctions of the gyrokinetic Vlasov-Poisson equations.

  2. CMB lensing tomography with the DES Science Verification galaxies

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Giannantonio, T.

    2016-01-07

    We measure the cross-correlation between the galaxy density in the Dark Energy Survey (DES) Science Verification data and the lensing of the cosmic microwave background (CMB) as reconstructed with the Planck satellite and the South Pole Telescope (SPT). When using the DES main galaxy sample over the full redshift range 0.2 < zphot < 1.2, a cross-correlation signal is detected at 6σ and 4σ with SPT and Planck respectively. We then divide the DES galaxies into five photometric redshift bins, finding significant (>2σ) detections in all bins. Comparing to the fiducial Planck cosmology, we find the redshift evolution of themore » signal matches expectations, although the amplitude is consistently lower than predicted across redshift bins. We test for possible systematics that could affect our result and find no evidence for significant contamination. Finally, we demonstrate how these measurements can be used to constrain the growth of structure across cosmic time. We find the data are fit by a model in which the amplitude of structure in the z < 1.2 universe is 0.73 ± 0.16 times as large as predicted in the LCDM Planck cosmology, a 1.7σ deviation.« less

  3. Cosmic Shear Measurements with DES Science Verification Data

    SciTech Connect (OSTI)

    Becker, M. R.

    2015-07-20

    We present measurements of weak gravitational lensing cosmic shear two-point statistics using Dark Energy Survey Science Verification data. We demonstrate that our results are robust to the choice of shear measurement pipeline, either ngmix or im3shape, and robust to the choice of two-point statistic, including both real and Fourier-space statistics. Our results pass a suite of null tests including tests for B-mode contamination and direct tests for any dependence of the two-point functions on a set of 16 observing conditions and galaxy properties, such as seeing, airmass, galaxy color, galaxy magnitude, etc. We use a large suite of simulations to compute the covariance matrix of the cosmic shear measurements and assign statistical significance to our null tests. We find that our covariance matrix is consistent with the halo model prediction, indicating that it has the appropriate level of halo sample variance. We also compare the same jackknife procedure applied to the data and the simulations in order to search for additional sources of noise not captured by the simulations. We find no statistically significant extra sources of noise in the data. The overall detection significance with tomography for our highest source density catalog is 9.7σ. Cosmological constraints from the measurements in this work are presented in a companion paper (DES et al. 2015).

  4. Monument Survey

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Photographs from the WIPP Permanent Marker Monument Survey John Hart & Associates, 2000 Photograph of the Gnome Marker located about 10 miles SW of the WIPP site For more...

  5. Survey Consumption

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    purchase diaries from a subset of respondents composing a Household Transportation Panel and is reported separately. Residential Energy Consumption Survey: Consumption and...

  6. radiological. survey

    National Nuclear Security Administration (NNSA)

    7%2A en NNSA to Conduct Aerial Radiological Surveys Over San Francisco, Pacifica, Berkeley, And Oakland, CA Areas http:nnsa.energy.govmediaroompressreleasesamsca

  7. Accelerating functional verification of an integrated circuit

    SciTech Connect (OSTI)

    Deindl, Michael; Ruedinger, Jeffrey Joseph; Zoellin, Christian G.

    2015-10-27

    Illustrative embodiments include a method, system, and computer program product for accelerating functional verification in simulation testing of an integrated circuit (IC). Using a processor and a memory, a serial operation is replaced with a direct register access operation, wherein the serial operation is configured to perform bit shifting operation using a register in a simulation of the IC. The serial operation is blocked from manipulating the register in the simulation of the IC. Using the register in the simulation of the IC, the direct register access operation is performed in place of the serial operation.

  8. Accelerating functional verification of an integrated circuit

    DOE Patents [OSTI]

    Deindl, Michael; Ruedinger, Jeffrey Joseph; Zoellin, Christian G

    2015-11-05

    Illustrative embodiments include a method, system, and computer program product for accelerating functional verification in simulation testing of an integrated circuit (IC). Using a processor and a memory, a serial operation is replaced with a direct register access operation, wherein the serial operation is configured to perform bit shifting operation using a register in a simulation of the IC. The serial operation is blocked from manipulating the register in the simulation of the IC. Using the register in the simulation of the IC, the direct register access operation is performed in place of the serial operation.

  9. Check Estimates and Independent Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Check estimates and independent cost estimates (ICEs) are tools that can be used to validate a cost estimate. Estimate validation entails an objective review of the estimate to ensure that estimate criteria and requirements have been met and well documented, defensible estimate has been developed. This chapter describes check estimates and their procedures and various types of independent cost estimates.

  10. SPR Hydrostatic Column Model Verification and Validation.

    SciTech Connect (OSTI)

    Bettin, Giorgia; Lord, David; Rudeen, David Keith

    2015-10-01

    A Hydrostatic Column Model (HCM) was developed to help differentiate between normal "tight" well behavior and small-leak behavior under nitrogen for testing the pressure integrity of crude oil storage wells at the U.S. Strategic Petroleum Reserve. This effort was motivated by steady, yet distinct, pressure behavior of a series of Big Hill caverns that have been placed under nitrogen for extended period of time. This report describes the HCM model, its functional requirements, the model structure and the verification and validation process. Different modes of operation are also described, which illustrate how the software can be used to model extended nitrogen monitoring and Mechanical Integrity Tests by predicting wellhead pressures along with nitrogen interface movements. Model verification has shown that the program runs correctly and it is implemented as intended. The cavern BH101 long term nitrogen test was used to validate the model which showed very good agreement with measured data. This supports the claim that the model is, in fact, capturing the relevant physical phenomena and can be used to make accurate predictions of both wellhead pressure and interface movements.

  11. Verification and validation for induction heating

    SciTech Connect (OSTI)

    Lam, Kin [Los Alamos National Laboratory; Tippetts, Trevor B [Los Alamos National Laboratory; Allen, David W [NON LANL

    2008-01-01

    Truchas is a software package being developed at LANL within the Telluride project for predicting the complex physical processes in metal alloy casting. The software was designed to be massively parallel, multi-material, multi-physics, and to run on 3D, fully unstructured meshes. This work describes a Verification and Validation assessment of Truchas for simulating the induction heating phase of a casting process. We used existing data from a simple experiment involving the induction heating of a graphite cylinder, as graphite is a common material used for mold assemblies. Because we do not have complete knowledge of all the conditions and properties in this experiment (as is the case in many other experiments), we performed a parameter sensitivity study, modeled the uncertainties of the most sensitive parameters, and quantified how these uncertainties propagate to the Truchas output response. A verification analysis produced estimates of the numerical error of the Truchas solution to our computational model. The outputs from Truchas runs with randomly sampled parameter values were used for the validation study.

  12. DESIGN INFORMATION VERIFICATION FOR NUCLEAR SAFEGUARDS

    SciTech Connect (OSTI)

    Robert S. Bean; Richard R. M. Metcalf; Phillip C. Durst

    2009-07-01

    A critical aspect of international safeguards activities performed by the International Atomic Energy Agency (IAEA) is the verification that facility design and construction (including upgrades and modifications) do not create opportunities for nuclear proliferation. These Design Information Verification activities require that IAEA inspectors compare current and past information about the facility to verify the operator’s declaration of proper use. The actual practice of DIV presents challenges to the inspectors due to the large amount of data generated, concerns about sensitive or proprietary data, the overall complexity of the facility, and the effort required to extract just the safeguards relevant information. Planned and anticipated facilities will (especially in the case of reprocessing plants) be ever larger and increasingly complex, thus exacerbating the challenges. This paper reports the results of a workshop held at the Idaho National Laboratory in March 2009, which considered technologies and methods to address these challenges. The use of 3D Laser Range Finding, Outdoor Visualization System, Gamma-LIDAR, and virtual facility modeling, as well as methods to handle the facility data issues (quantity, sensitivity, and accessibility and portability for the inspector) were presented. The workshop attendees drew conclusions about the use of these techniques with respect to successfully employing them in an operating environment, using a Fuel Conditioning Facility walk-through as a baseline for discussion.

  13. Nonintrusive verification attributes for excess fissile materials

    SciTech Connect (OSTI)

    Nicholas, N.J.; Eccleston, G.W.; Fearey, B.L.

    1997-10-01

    Under US initiatives, over two hundred metric tons of fissile materials have been declared to be excess to national defense needs. These excess materials are in both classified and unclassified forms. The US has expressed the intent to place these materials under international inspections as soon as practicable. To support these commitments, members of the US technical community are examining a variety of nonintrusive approaches (i.e., those that would not reveal classified or sensitive information) for verification of a range of potential declarations for these classified and unclassified materials. The most troublesome and potentially difficult issues involve approaches for international inspection of classified materials. The primary focus of the work to date has been on the measurement of signatures of relevant materials attributes (e.g., element, identification number, isotopic ratios, etc.), especially those related to classified materials and items. The authors are examining potential attributes and related measurement technologies in the context of possible verification approaches. The paper will discuss the current status of these activities, including their development, assessment, and benchmarking status.

  14. Advanced Waste Management Now Available as Accredited SEP Verification Body

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy is pleased to announce that Advanced Waste Management Systems Inc. (AWM) is now a fully accredited Verification Body for Superior Energy Performance™ (SEP). This ANSI-ANAB accreditation enables AWM to provide third-party verification for industrial facilities that wish to demonstrate energy management excellence and sustained energy savings to earn SEP certification.

  15. Spent Nuclear Fuel (SNF) Multi Canister Overpack (MCO) Design Verification Summary

    SciTech Connect (OSTI)

    GOLDMANN, L.H.

    1999-11-30

    This document summarizes the design verification activities performed on the Multi-canister Overpack design and documents verification plans for design changes during fabrication.

  16. Distributed Hydrogen Production from Natural Gas: Independent...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Production from Natural Gas: IndependentReview Panel Report Distributed Hydrogen Production from Natural Gas: Independent Review Panel Report Independent review report on the ...

  17. Approaches to verification of two-dimensional water quality models

    SciTech Connect (OSTI)

    Butkus, S.R. . Water Quality Dept.)

    1990-11-01

    The verification of a water quality model is the one procedure most needed by decision making evaluating a model predictions, but is often not adequate or done at all. The results of a properly conducted verification provide the decision makers with an estimate of the uncertainty associated with model predictions. Several statistical tests are available for quantifying of the performance of a model. Six methods of verification were evaluated using an application of the BETTER two-dimensional water quality model for Chickamauga reservoir. Model predictions for ten state variables were compared to observed conditions from 1989. Spatial distributions of the verification measures showed the model predictions were generally adequate, except at a few specific locations in the reservoir. The most useful statistics were the mean standard error of the residuals. Quantifiable measures of model performance should be calculated during calibration and verification of future applications of the BETTER model. 25 refs., 5 figs., 7 tabs.

  18. Sequence independent amplification of DNA

    DOE Patents [OSTI]

    Bohlander, S.K.

    1998-03-24

    The present invention is a rapid sequence-independent amplification procedure (SIA). Even minute amounts of DNA from various sources can be amplified independent of any sequence requirements of the DNA or any a priori knowledge of any sequence characteristics of the DNA to be amplified. This method allows, for example, the sequence independent amplification of microdissected chromosomal material and the reliable construction of high quality fluorescent in situ hybridization (FISH) probes from YACs or from other sources. These probes can be used to localize YACs on metaphase chromosomes but also--with high efficiency--in interphase nuclei. 25 figs.

  19. Sequence independent amplification of DNA

    DOE Patents [OSTI]

    Bohlander, Stefan K.

    1998-01-01

    The present invention is a rapid sequence-independent amplification procedure (SIA). Even minute amounts of DNA from various sources can be amplified independent of any sequence requirements of the DNA or any a priori knowledge of any sequence characteristics of the DNA to be amplified. This method allows, for example the sequence independent amplification of microdissected chromosomal material and the reliable construction of high quality fluorescent in situ hybridization (FISH) probes from YACs or from other sources. These probes can be used to localize YACs on metaphase chromosomes but also--with high efficiency--in interphase nuclei.

  20. Information handbook on independent spent fuel storage installations

    SciTech Connect (OSTI)

    Raddatz, M.G.; Waters, M.D.

    1996-12-01

    In this information handbook, the staff of the U.S. Nuclear Regulatory Commission describes (1) background information regarding the licensing and history of independent spent fuel storage installations (ISFSIs), (2) a discussion of the licensing process, (3) a description of all currently approved or certified models of dry cask storage systems (DCSSs), and (4) a description of sites currently storing spent fuel in an ISFSI. Storage of spent fuel at ISFSIs must be in accordance with the provisions of 10 CFR Part 72. The staff has provided this handbook for information purposes only. The accuracy of any information herein is not guaranteed. For verification or for more details, the reader should refer to the respective docket files for each DCSS and ISFSI site. The information in this handbook is current as of September 1, 1996.

  1. Midcontinent Independent System Operator, Inc.

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Midcontinent Independent System Operator, Inc. 317.249-5400 www.misoenergy.org PO Box 4202 ... Inc. 317.249-5400 www.misoenergy.org PO Box 4202 Carmel, Indiana 46037 2985 Ames ...

  2. External Independent Review (EIR) Standard Operating Procedure...

    Broader source: Energy.gov (indexed) [DOE]

    External Independent Review (EIR) Standard Operating Procedure (SOP) - September 2010 More Documents & Publications External Independent Review (EIR) Standard Operating Procedure...

  3. Independent Oversight Inspection, Los Alamos National Laboratory...

    Energy Savers [EERE]

    Inspection, Los Alamos National Laboratory - January 2007 Independent Oversight Inspection, Los Alamos National Laboratory - January 2007 January 2007 Independent Oversight...

  4. Mapping and Simulating Systematics Due to Spatially-Varying Observing Conditions in DES Science Verification Data

    SciTech Connect (OSTI)

    Leistedt, B.

    2015-07-20

    Spatially-varying depth and characteristics of observing conditions, such as seeing, airmass, or sky background, are major sources of systematic uncertainties in modern galaxy survey analyses, in particular in deep multi-epoch surveys. We present a framework to extract and project these sources of systematics onto the sky, and apply it to the Dark Energy Survey (DES) to map the observing conditions of the Science Verification (SV) data. The resulting distributions and maps of sources of systematics are used in several analyses of DES SV to perform detailed null tests with the data, and also to incorporate systematics in survey simulations. We illustrate the complementarity of these two approaches by comparing the SV data with the BCC-UFig, a synthetic sky catalogue generated by forward-modelling of the DES SV images. We then analyse the BCC-UFig simulation to construct galaxy samples mimicking those used in SV galaxy clustering studies. We show that the spatially-varying survey depth imprinted in the observed galaxy densities and the redshift distributions of the SV data are successfully reproduced by the simulation and well-captured by the maps of observing conditions. The combined use of the maps, the SV data and the BCC-UFig simulation allows us to quantify the impact of spatial systematics on N(z), the redshift distributions inferred using photometric redshifts. We conclude that spatial systematics in the SV data are mainly due to seeing fluctuations and are under control in current clustering and weak lensing analyses. However, they will need to be carefully characterised in upcoming phases of DES in order to avoid biasing the inferred cosmological results. The framework presented is relevant to all multi-epoch surveys, and will be essential for exploiting future surveys such as the Large Synoptic Survey Telescope, which will require detailed null-tests and realistic end-to-end image simulations to correctly interpret the deep, high-cadence observations of the

  5. Developing an Evaluation Measurement and Verification Plan for Your Energy Efficiency Project/Program

    Broader source: Energy.gov [DOE]

    Developing an Evaluation Measurement and Verification Plan for Your Energy Efficiency Project/Program

  6. Comment submitted by Whirlpool Corporation regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by Whirlpool Corporation regarding the Energy Star Verification Testing Program

  7. Energy Savings Performance Contracting-Savings Measurement and Verification Transcript 2-24-2011.doc

    Broader source: Energy.gov [DOE]

    Energy Savings Performance Contracting-Savings Measurement and Verification Transcript 2-24-2011.doc

  8. Comment submitted by Consumers Union regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by Consumers Union regarding the Energy Star Verification Testing Program

  9. ENERGY STAR Appliance Verification Testing- Pilot Program Summary Report dated February 3, 2012

    Broader source: Energy.gov [DOE]

    This document is ENERGY STAR Appliance Verification Testing - Pilot Program Summary Report dated February 3, 2012

  10. FAQ's for: ENERGY STAR Verification Testing Pilot Program dated December 2010

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document is the FAQ's for the ENERGY STAR Verification Testing Pilot Program dated December 2010

  11. Comment submitted by Traulsen regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by Traulsen regarding the Energy Star Verification Testing Program

  12. Comment submitted by Earthjustice regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by Earthjustice regarding the Energy Star Verification Testing Program

  13. State and Local Energy Savings Performance Contracting: Savings Measurement and Verification (M&V)

    Office of Energy Efficiency and Renewable Energy (EERE)

    State and Local Energy Savings Performance Contracting: Savings Measurement and Verification (M&V) Webinar.

  14. Independent Oversight Review, Argonne National Laboratory- November 2011

    Broader source: Energy.gov [DOE]

    Review of the Argonne National Laboratory Alpha-Gamma Hot Cell Facility Readiness Assessment (Implementation Verification Review Sections)

  15. The Independent Technical Analysis Process

    SciTech Connect (OSTI)

    Duberstein, Corey A.; Ham, Kenneth D.; Dauble, Dennis D.; Johnson, Gary E.

    2007-04-13

    The Bonneville Power Administration (BPA) contracted with the Pacific Northwest National Laboratory (PNNL) to provide technical analytical support for system-wide fish passage information (BPA Project No. 2006-010-00). The goal of this project was to produce rigorous technical analysis products using independent analysts and anonymous peer reviewers. In the past, regional parties have interacted with a single entity, the Fish Passage Center to access the data, analyses, and coordination related to fish passage. This project provided an independent technical source for non-routine fish passage analyses while allowing routine support functions to be performed by other well-qualified entities.

  16. Charpy impact test results on five materials and NIST verification...

    Office of Scientific and Technical Information (OSTI)

    test results on five materials and NIST verification specimens using instrumented 2-mm and 8-mm strikers Citation Details In-Document Search Title: Charpy impact test results on ...

  17. M&V Guidelines: Measurement and Verification for Federal Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 4.0 ... Management Program November 2015 FEMP M&V Guidelines 4.0 i ACKNOWLEDGMENTS ...

  18. System for Analysis of Soil-Structure Interaction (SASSI) Verification...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System for Analysis of Soil-Structure Interaction (SASSI) Verification & Validation (V&V) Problem Set SASSI is the System for Analysis of Soil-Structure Interaction, a computer ...

  19. M&V Guidelines: Measurement and Verification for Federal Energy...

    Energy Savers [EERE]

    and Verification Protocol (IPMVP) Concepts and Options for Determining Energy and Water Savings Volume 1, April 2007. M&V Guidelines 3.0 FEMP ii Contents Section Page Section...

  20. Assessment of Automated Measurement and Verification (M&V) Methods

    SciTech Connect (OSTI)

    Granderson, Jessica; Touzani, Samir; Custodio, Claudine; Sohn, Michael; Fernandes, Samuel; Jump, David

    2015-07-01

    This report documents the application of a general statistical methodology to assess the accuracy of baseline energy models, focusing on its application to Measurement and Verification (M&V) of whole-building energy savings.

  1. Integrated safety management system verification: Volume 1

    SciTech Connect (OSTI)

    Christensen, R.F.

    1998-08-12

    Department of Energy (DOE) Policy (P) 450.4, Safety Management System Policy, commits to institutionalizing an Integrated Safety Management System (ISMS) throughout the DOE complex. The DOE Acquisition Regulations (DEAR 48 CFR 970) requires contractors to manage and perform work in accordance with a documented Integrated Safety Management System. The Manager, Richland Operations Office (RL), initiated a combined Phase 1 and Phase 2 Integrated Safety Management Verification review to confirm that PNNL had successfully submitted a description of their ISMS and had implemented ISMS within the laboratory facilities and processes. A combined review was directed by the Manager, RL, based upon the progress PNNL had made in the implementation of ISM. This report documents the results of the review conducted to verify: (1) that the PNNL integrated safety management system description and enabling documents and processes conform to the guidance provided by the Manager, RL; (2) that corporate policy is implemented by line managers; (3) that PNNL has provided tailored direction to the facility management; and (4) the Manager, RL, has documented processes that integrate their safety activities and oversight with those of PNNL. The general conduct of the review was consistent with the direction provided by the Under Secretary`s Draft Safety Management System Review and Approval Protocol. The purpose of this review was to provide the Manager, RL, with a recommendation to the adequacy of the ISMS description of the Pacific Northwest Laboratory based upon compliance with the requirements of 49 CFR 970.5204(-2 and -78); and, to provide an evaluation of the extent and maturity of ISMS implementation within the Laboratory. Further, this review was intended to provide a model for other DOE Laboratories. In an effort to reduce the time and travel costs associated with ISM verification the team agreed to conduct preliminary training and orientation electronically and by phone. These

  2. Sandia National Laboratories: Advanced Simulation Computing: Verification &

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Validation Verification & Validation high-fidelity simulations The Verification and Validation (V&V) program conducts two major activities at Sandia. The first is to perform assessments and studies that quantify confidence in Advanced Simulation and Computing (ASC) calculation results. The second activity develops and improves V&V and uncertainty quantification methods, metrics, and standards. Assessments This project area conducts studies and assessments for Sandia's engineering

  3. Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sampling | Department of Energy Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification Sampling Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification Sampling Proceedings of the Fourth International Conference on Remediation of Chlorinated and Recalcitrant Compounds. May 2004, Monterey, California. Charles Tabor, Randall Juhlin, Paul Darr, Julian Caballero, Joseph Daniel, David Ingle Nonaqueous-Phase Liquid Characterization and Post-Remediation

  4. ENERGY STAR Test Procedures and Verification | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appliance & Equipment Standards » ENERGY STAR » ENERGY STAR Test Procedures and Verification ENERGY STAR Test Procedures and Verification The Department of Energy (DOE) is the lead agency in the development and revision of all test procedures for products in the ENERGY STAR® program, including those products that are also subject to DOE's Energy Conservation Standards program. As specifications are updated and new products or metrics are added to the ENERGY STAR program, DOE is

  5. Hanford Site Assessment & Characterization/Verification of Buildings Procedure

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 Revision 2 Hanford Site Assessment & Characterization/Verification of Buildings Procedure Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management Approved for Public Release; Further Dissemination Unlimited DOE-0342-002, Rev. 2 Hanford Site Wide Assessment and Characterization/Verification of Buildings Procedure Published Date: 09/08/15 Effective Date: 09/25/15 ii CHANGE SUMMARY Rev # Date-Section Changed Change Details 2 10/06/14 - 1.0 Add statement

  6. Automated Testing Instrument for Verification of Complex Computational

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Systems | Princeton Plasma Physics Lab Automated Testing Instrument for Verification of Complex Computational Systems Verifying the functionality and proper operation of both hardware and software of complex, low, medium and high speed, Real-Time Instrumentation, Acquisition, Control and Protection systems is typically time consuming and costly. When these systems are expanded, modified, enhanced with new features or software 'bugs' corrected, re-verification of correct operation must be

  7. Numerical Verification of Bounce Harmonic Resonances in Neoclassical

    Office of Scientific and Technical Information (OSTI)

    Toroidal Viscosity for Tokamaks (Technical Report) | SciTech Connect Numerical Verification of Bounce Harmonic Resonances in Neoclassical Toroidal Viscosity for Tokamaks Citation Details In-Document Search Title: Numerical Verification of Bounce Harmonic Resonances in Neoclassical Toroidal Viscosity for Tokamaks This Letter presents the rst numerical veri cation for the bounce-harmonic (BH) resonance phenomena of the neoclassical transport in a tokamak perturbed by non-axisymmetric magnetic

  8. Verification and Validation of RADTRAN 5.5.

    SciTech Connect (OSTI)

    Osborn, Douglas.; Weiner, Ruth F.; Mills, George Scott; Hamp, Steve C.

    2005-02-01

    This document contains a description of the verification and validation process used for the RADTRAN 5.5 code. The verification and validation process ensured the proper calculational models and mathematical and numerical methods were used in the RADTRAN 5.5 code for the determination of risk and consequence assessments. The differences between RADTRAN 5 and RADTRAN 5.5 are the addition of tables, an expanded isotope library, and the additional User-Defined meteorological option for accident dispersion. 3

  9. Battery Technology Life Verification Testing and Analysis

    SciTech Connect (OSTI)

    Jon P. Christophersen; Gary L. Hunt; Ira Bloom; Ed Thomas; Vince Battaglia

    2007-12-01

    A critical component to the successful commercialization of batteries for automotive applications is accurate life prediction. The Technology Life Verification Test (TLVT) Manual was developed to project battery life with a high level of statistical confidence within only one or two years of accelerated aging. The validation effort that is presently underway has led to several improvements to the original methodology. For example, a newly developed reference performance test revealed a voltage path dependence effect on resistance for lithium-ion cells. The resistance growth seems to depend on how a target condition is reached (i.e., by a charge or a discharge). Second, the methodology for assessing the level of measurement uncertainty was improved using a propagation of errors in the fundamental measurements to the derived response (e.g., resistance). This new approach provides a more realistic assessment of measurement uncertainty. Third, the methodology for allocating batteries to the test matrix has been improved. The new methodology was developed to assign batteries to the matrix such that the average of each test group would be representative of the overall population. These changes to the TLVT methodology will help to more accurately predict a battery technology’s life capability with a high degree of confidence.

  10. Automated radiotherapy treatment plan integrity verification

    SciTech Connect (OSTI)

    Yang Deshan; Moore, Kevin L.

    2012-03-15

    Purpose: In our clinic, physicists spend from 15 to 60 min to verify the physical and dosimetric integrity of radiotherapy plans before presentation to radiation oncology physicians for approval. The purpose of this study was to design and implement a framework to automate as many elements of this quality control (QC) step as possible. Methods: A comprehensive computer application was developed to carry out a majority of these verification tasks in the Philips PINNACLE treatment planning system (TPS). This QC tool functions based on both PINNACLE scripting elements and PERL sub-routines. The core of this technique is the method of dynamic scripting, which involves a PERL programming module that is flexible and powerful for treatment plan data handling. Run-time plan data are collected, saved into temporary files, and analyzed against standard values and predefined logical rules. The results were summarized in a hypertext markup language (HTML) report that is displayed to the user. Results: This tool has been in clinical use for over a year. The occurrence frequency of technical problems, which would cause delays and suboptimal plans, has been reduced since clinical implementation. Conclusions: In addition to drastically reducing the set of human-driven logical comparisons, this QC tool also accomplished some tasks that are otherwise either quite laborious or impractical for humans to verify, e.g., identifying conflicts amongst IMRT optimization objectives.

  11. Safeguards Verification Measurements using Laser Ablation, Absorbance Ratio Spectrometry in Gaseous Centrifuge Enrichment Plants

    SciTech Connect (OSTI)

    Anheier, Norman C.; Cannon, Bret D.; Kulkarni, Gourihar R.; Munley, John T.; Nelson, Danny A.; Qiao, Hong; Phillips, Jon R.

    2012-07-17

    Laser Ablation Absorbance Ratio Spectrometry (LAARS) is a new verification measurement technology under development at the US Department of Energy (DOE) Pacific Northwest National Laboratory (PNNL). LAARS uses three lasers to ablate and then measure the relative isotopic abundance of uranium compounds. An ablation laser is tightly focused on uranium-bearing solids, producing a small atomic uranium vapor plume. Two collinear wavelength-tuned spectrometry lasers transit through the plume and the absorbance of U-235 and U-238 isotopes are measured to determine U-235 enrichment. The measurement is independent of chemical form and degree of dilution with nuisance dust and other materials. LAARS has high relative precision and detection limits approaching the femtogram range for U-235. The sample is scanned and assayed point-by-point at rates reaching 1 million measurements/hour, enabling LAARS to detect and analyze uranium in trace samples. The spectrometer is assembled using primarily commercially available components and features a compact design and automated analysis.Two specific gaseous centrifuge enrichment plant (GCEP) applications of the spectrometer are currently under development: 1) LAARS-Environmental Sampling (ES), which collects and analyzes aerosol particles for GCEP misuse detection and 2) LAARS-Destructive Assay (DA), which enables onsite enrichment DA sample collection and analysis for protracted diversion detection. The two applications propose game-changing technological advances in GCEP safeguards verification.

  12. Enhanced Verification Test Suite for Physics Simulation Codes

    SciTech Connect (OSTI)

    Kamm, J R; Brock, J S; Brandon, S T; Cotrell, D L; Johnson, B; Knupp, P; Rider, W; Trucano, T; Weirs, V G

    2008-10-10

    This document discusses problems with which to augment, in quantity and in quality, the existing tri-laboratory suite of verification problems used by Los Alamos National Laboratory (LANL), Lawrence Livermore National Laboratory (LLNL), and Sandia National Laboratories (SNL). The purpose of verification analysis is demonstrate whether the numerical results of the discretization algorithms in physics and engineering simulation codes provide correct solutions of the corresponding continuum equations. The key points of this document are: (1) Verification deals with mathematical correctness of the numerical algorithms in a code, while validation deals with physical correctness of a simulation in a regime of interest. This document is about verification. (2) The current seven-problem Tri-Laboratory Verification Test Suite, which has been used for approximately five years at the DOE WP laboratories, is limited. (3) Both the methodology for and technology used in verification analysis have evolved and been improved since the original test suite was proposed. (4) The proposed test problems are in three basic areas: (a) Hydrodynamics; (b) Transport processes; and (c) Dynamic strength-of-materials. (5) For several of the proposed problems we provide a 'strong sense verification benchmark', consisting of (i) a clear mathematical statement of the problem with sufficient information to run a computer simulation, (ii) an explanation of how the code result and benchmark solution are to be evaluated, and (iii) a description of the acceptance criterion for simulation code results. (6) It is proposed that the set of verification test problems with which any particular code be evaluated include some of the problems described in this document. Analysis of the proposed verification test problems constitutes part of a necessary--but not sufficient--step that builds confidence in physics and engineering simulation codes. More complicated test cases, including physics models of greater

  13. Ion mobility spectrometer, spectrometer analyte detection and identification verification system, and method

    DOE Patents [OSTI]

    Atkinson, David A.

    2002-01-01

    Methods and apparatus for ion mobility spectrometry and analyte detection and identification verification system are disclosed. The apparatus is configured to be used in an ion mobility spectrometer and includes a plurality of reactant reservoirs configured to contain a plurality of reactants which can be reacted with the sample to form adducts having varying ion mobilities. A carrier fluid, such as air or nitrogen, is used to carry the sample into the spectrometer. The plurality of reactants are configured to be selectively added to the carrier stream by use inlet and outlet manifolds in communication with the reagent reservoirs, the reservoirs being selectively isolatable by valves. The invention further includes a spectrometer having the reagent system described. In the method, a first reactant is used with the sample. Following a positive result, a second reactant is used to determine whether a predicted response occurs. The occurrence of the second predicted response tends to verify the existence of a component of interest within the sample. A third reactant can also be used to provide further verification of the existence of a component of interest. A library can be established of known responses of compounds of interest with various reactants and the results of a specific multi-reactant survey of a sample can be compared against the library to determine whether a component detected in the sample is likely to be a specific component of interest.

  14. Small Business Independent Market Research Program | National...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Independent Market Research Program Researching, identifying, and evaluating, ... Once a program requirement is identified, an independent research task is activated to ...

  15. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Environmental Management (EM)

    Independent Oversight Review, Los Alamos National Laboratory - January 2012 Independent Oversight Review, Los Alamos National Laboratory Chemistry and Metallurgy Research Facility ...

  16. External Independent Review (EIR) Standard Operating Procedure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    External Independent Review (EIR) Standard Operating Procedure (SOP) October 2008 External Independent Review (EIR) Standard Operating Procedure (SOP) October 2008 External ...

  17. Independent Oversight Review, Bonneville Power Administration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (Independent Oversight), within the Office of Health, Safety and Security, conduct an independent review of the Bonneville Power Administration (BPA) safety management program. ...

  18. Independent Oversight Assessment, Salt Waste Processing Facility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Headquarters - November 2012 Independent Oversight Assessment, Los Alamos National Laboratory - April 2012 An Independent Evaluation of Safety Culture at the U.S....

  19. INDEPENDENT TECHNICAL ASSESSMENT OF MANAGEMENT OF STORMWATER...

    Office of Scientific and Technical Information (OSTI)

    INDEPENDENT TECHNICAL ASSESSMENT OF MANAGEMENT OF STORMWATER AND WASTEWATER AT THE ... Title: INDEPENDENT TECHNICAL ASSESSMENT OF MANAGEMENT OF STORMWATER AND WASTEWATER AT THE ...

  20. NERSC Calculations Provide Independent Confirmation of Global...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Calculations Provide Independent Confirmation of Global Land Warming Since 1901 NERSC Calculations Provide Independent Confirmation of Global Land Warming Since 1901 September 9, ...

  1. Independent Energy Systems IES | Open Energy Information

    Open Energy Info (EERE)

    IES Jump to: navigation, search Name: Independent Energy Systems (IES) Place: Santa Cruz, California Zip: 95062 Product: Independent Energy Systems sells, designs, and installs...

  2. Midwest Independent Transmission System Operator | Open Energy...

    Open Energy Info (EERE)

    Midwest Independent Transmission System Operator Jump to: navigation, search Name: Midwest Independent Transmission System Operator Place: Carmel, IN References: SGIC1 This...

  3. Independent Power Systems | Open Energy Information

    Open Energy Info (EERE)

    Systems is an independent energy consultancy specialising in reducing client energy and environmental costs. References: Independent Power Systems1 This article is a stub. You...

  4. Mobile Pit verification system design based on passive special nuclear material verification in weapons storage facilities

    SciTech Connect (OSTI)

    Paul, J. N.; Chin, M. R.; Sjoden, G. E.

    2013-07-01

    A mobile 'drive by' passive radiation detection system to be applied in special nuclear materials (SNM) storage facilities for validation and compliance purposes has been designed through the use of computational modeling and new radiation detection methods. This project was the result of work over a 1 year period to create optimal design specifications to include creation of 3D models using both Monte Carlo and deterministic codes to characterize the gamma and neutron leakage out each surface of SNM-bearing canisters. Results were compared and agreement was demonstrated between both models. Container leakages were then used to determine the expected reaction rates using transport theory in the detectors when placed at varying distances from the can. A 'typical' background signature was incorporated to determine the minimum signatures versus the probability of detection to evaluate moving source protocols with collimation. This established the criteria for verification of source presence and time gating at a given vehicle speed. New methods for the passive detection of SNM were employed and shown to give reliable identification of age and material for highly enriched uranium (HEU) and weapons grade plutonium (WGPu). The finalized 'Mobile Pit Verification System' (MPVS) design demonstrated that a 'drive-by' detection system, collimated and operating at nominally 2 mph, is capable of rapidly verifying each and every weapon pit stored in regularly spaced, shelved storage containers, using completely passive gamma and neutron signatures for HEU and WGPu. This system is ready for real evaluation to demonstrate passive total material accountability in storage facilities. (authors)

  5. Organics Verification Study for Sinclair and Dyes Inlets, Washington

    SciTech Connect (OSTI)

    Kohn, Nancy P.; Brandenberger, Jill M.; Niewolny, Laurie A.; Johnston, Robert K.

    2006-09-28

    Sinclair and Dyes Inlets near Bremerton, Washington, are on the State of Washington 1998 303(d) list of impaired waters because of fecal coliform contamination in marine water, metals in sediment and fish tissue, and organics in sediment and fish tissue. Because significant cleanup and source control activities have been conducted in the inlets since the data supporting the 1998 303(d) listings were collected, two verification studies were performed to address the 303(d) segments that were listed for metal and organic contaminants in marine sediment. The Metals Verification Study (MVS) was conducted in 2003; the final report, Metals Verification Study for Sinclair and Dyes Inlets, Washington, was published in March 2004 (Kohn et al. 2004). This report describes the Organics Verification Study that was conducted in 2005. The study approach was similar to the MVS in that many surface sediment samples were screened for the major classes of organic contaminants, and then the screening results and other available data were used to select a subset of samples for quantitative chemical analysis. Because the MVS was designed to obtain representative data on concentrations of contaminants in surface sediment throughout Sinclair Inlet, Dyes Inlet, Port Orchard Passage, and Rich Passage, aliquots of the 160 MVS sediment samples were used in the analysis for the Organics Verification Study. However, unlike metals screening methods, organics screening methods are not specific to individual organic compounds, and are not available for some target organics. Therefore, only the quantitative analytical results were used in the organics verification evaluation. The results of the Organics Verification Study showed that sediment quality outside of Sinclair Inlet is unlikely to be impaired because of organic contaminants. Similar to the results for metals, in Sinclair Inlet, the distribution of residual organic contaminants is generally limited to nearshore areas already within the

  6. Dosimetric characterization and output verification for conical brachytherapy surface applicators. Part I. Electronic brachytherapy source

    SciTech Connect (OSTI)

    Fulkerson, Regina K. Micka, John A.; DeWerd, Larry A.

    2014-02-15

    Purpose: Historically, treatment of malignant surface lesions has been achieved with linear accelerator based electron beams or superficial x-ray beams. Recent developments in the field of brachytherapy now allow for the treatment of surface lesions with specialized conical applicators placed directly on the lesion. Applicators are available for use with high dose rate (HDR){sup 192}Ir sources, as well as electronic brachytherapy sources. Part I of this paper will discuss the applicators used with electronic brachytherapy sources; Part II will discuss those used with HDR {sup 192}Ir sources. Although the use of these applicators has gained in popularity, the dosimetric characteristics including depth dose and surface dose distributions have not been independently verified. Additionally, there is no recognized method of output verification for quality assurance procedures with applicators like these. Existing dosimetry protocols available from the AAPM bookend the cross-over characteristics of a traditional brachytherapy source (as described by Task Group 43) being implemented as a low-energy superficial x-ray beam (as described by Task Group 61) as observed with the surface applicators of interest. Methods: This work aims to create a cohesive method of output verification that can be used to determine the dose at the treatment surface as part of a quality assurance/commissioning process for surface applicators used with HDR electronic brachytherapy sources (Part I) and{sup 192}Ir sources (Part II). Air-kerma rate measurements for the electronic brachytherapy sources were completed with an Attix Free-Air Chamber, as well as several models of small-volume ionization chambers to obtain an air-kerma rate at the treatment surface for each applicator. Correction factors were calculated using MCNP5 and EGSnrc Monte Carlo codes in order to determine an applicator-specific absorbed dose to water at the treatment surface from the measured air-kerma rate. Additionally

  7. Tank waste remediation system FSAR hazard identification/facility configuration verification report

    SciTech Connect (OSTI)

    Mendoza, D.P., Westinghouse Hanford

    1996-05-01

    This document provides the results of the Tank Waste Remediation System Final Safety Analysis Report (TWRS FSAR) hazards identification/facility configuration activities undertaken from the period of March 7, 1996 to May 31, 1996. The purpose of this activity was to provide an independent overview of the TWRS facility specific hazards and configurations that were used in support of the TWRS FSAR hazards and accident analysis development. It was based on a review of existing published documentation and field inspections. The objective of the verification effort was to provide a `snap shot` in time of the existing TWRS facility hazards and configurations and will be used to support hazards and accident analysis activities.

  8. Wide-Field Lensing Mass Maps from DES Science Verification Data

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Chang, C.; Vikram, V.; Jain, B.

    2015-07-29

    We present a mass map reconstructed from weak gravitational lensing shear measurements over 139 deg2 from the Dark Energy Survey (DES) Science Verification data. The mass map probes both luminous and dark matter, thus providing a tool for studying cosmology. We find good agreement between the mass map and the distribution of massive galaxy clusters identified using a red-sequence cluster finder. Potential candidates for super-clusters and voids are identified using these maps. We measure the cross-correlation between the mass map and a magnitude-limited foreground galaxy sample and find a detection at the 6.8? level with 20 arcminute smoothing. These measurementsmoreare consistent with simulated galaxy catalogs based on ?CDM Nbody simulations, suggesting low systematics uncertainties in the map. We summarize our key findings in this letter; the detailed methodology and tests for systematics are presented in a companion paper.less

  9. verification & Validation of High-Order Short-Characteristics-Based Deterministic Transport Methodology on Unstructured Grids

    SciTech Connect (OSTI)

    Azmy, Yousry; Wang, Yaqi

    2013-12-20

    The research team has developed a practical, high-order, discrete-ordinates, short characteristics neutron transport code for three-dimensional configurations represented on unstructured tetrahedral grids that can be used for realistic reactor physics applications at both the assembly and core levels. This project will perform a comprehensive verification and validation of this new computational tool against both a continuous-energy Monte Carlo simulation (e.g. MCNP) and experimentally measured data, an essential prerequisite for its deployment in reactor core modeling. Verification is divided into three phases. The team will first conduct spatial mesh and expansion order refinement studies to monitor convergence of the numerical solution to reference solutions. This is quantified by convergence rates that are based on integral error norms computed from the cell-by-cell difference between the codes numerical solution and its reference counterpart. The latter is either analytic or very fine- mesh numerical solutions from independent computational tools. For the second phase, the team will create a suite of code-independent benchmark configurations to enable testing the theoretical order of accuracy of any particular discretization of the discrete ordinates approximation of the transport equation. For each tested case (i.e. mesh and spatial approximation order), researchers will execute the code and compare the resulting numerical solution to the exact solution on a per cell basis to determine the distribution of the numerical error. The final activity comprises a comparison to continuous-energy Monte Carlo solutions for zero-power critical configuration measurements at Idaho National Laboratorys Advanced Test Reactor (ATR). Results of this comparison will allow the investigators to distinguish between modeling errors and the above- listed discretization errors introduced by the deterministic method, and to separate the sources of uncertainty.

  10. Hybrid Enrichment Assay Methods for a UF6 Cylinder Verification Station: FY10 Progress Report

    SciTech Connect (OSTI)

    Smith, Leon E.; Jordan, David V.; Orton, Christopher R.; Misner, Alex C.; Mace, Emily K.

    2010-08-01

    HPGe verification station at AREVA, and the IAEA’s uncertainty target values for feed, tail and product cylinders. A summary of the major findings from the field measurements and subsequent analysis follows: • Traditional enrichment-meter assay using specially collimated NaI spectrometers and a Square-Wave-Convolute algorithm can achieve uncertainties comparable to HPGe and LaBr for product, natural and depleted cylinders. • Non-traditional signatures measured using NaI spectrometers enable interrogation of the entire cylinder volume and accurate measurement of absolute 235U mass in product, natural and depleted cylinders. • A hybrid enrichment assay method can achieve lower uncertainties than either the traditional or non-traditional methods acting independently because there is a low degree of correlation in the systematic errors of the two individual methods (wall thickness variation and 234U/235U variation, respectively). This work has indicated that the hybrid NDA method has the potential to serve as the foundation for an unattended cylinder verification station. When compared to today’s handheld cylinder-verification approach, such a station would have the following advantages: 1) improved enrichment assay accuracy for product, tail and feed cylinders; 2) full-volume assay of absolute 235U mass; 3) assay of minor isotopes (234U and 232U) important to verification of feedstock origin; single instrumentation design for both Type 30B and Type 48 cylinders; and 4) substantial reduction in the inspector manpower associated with cylinder verification.

  11. Appraisal Process Protocols, Independent Oversight - December 2015 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Appraisal Process Protocols, Independent Oversight - December 2015 Appraisal Process Protocols, Independent Oversight - December 2015 December 2015 Independent Oversight Appraisal Process Protocols These appraisal process protocols provide an overview of the general process that applies to all independent oversight appraisal activities. The subordinate oversight offices maintain more detailed program plans, guides, procedures, and protocols as necessary to assist in

  12. Radionuclide Inventory Distribution Project Data Evaluation and Verification White Paper

    SciTech Connect (OSTI)

    NSTec Environmental Restoration

    2010-05-17

    Testing of nuclear explosives caused widespread contamination of surface soils on the Nevada Test Site (NTS). Atmospheric tests produced the majority of this contamination. The Radionuclide Inventory and Distribution Program (RIDP) was developed to determine distribution and total inventory of radionuclides in surface soils at the NTS to evaluate areas that may present long-term health hazards. The RIDP achieved this objective with aerial radiological surveys, soil sample results, and in situ gamma spectroscopy. This white paper presents the justification to support the use of RIDP data as a guide for future evaluation and to support closure of Soils Sub-Project sites under the purview of the Federal Facility Agreement and Consent Order. Use of the RIDP data as part of the Data Quality Objective process is expected to provide considerable cost savings and accelerate site closures. The following steps were completed: - Summarize the RIDP data set and evaluate the quality of the data. - Determine the current uses of the RIDP data and cautions associated with its use. - Provide recommendations for enhancing data use through field verification or other methods. The data quality is sufficient to utilize RIDP data during the planning process for site investigation and closure. Project planning activities may include estimating 25-millirem per industrial access year dose rate boundaries, optimizing characterization efforts, projecting final end states, and planning remedial actions. In addition, RIDP data may be used to identify specific radionuclide distributions, and augment other non-radionuclide dose rate data. Finally, the RIDP data can be used to estimate internal and external dose rates. The data quality is sufficient to utilize RIDP data during the planning process for site investigation and closure. Project planning activities may include estimating 25-millirem per industrial access year dose rate boundaries, optimizing characterization efforts, projecting final

  13. Trends in independent power production

    SciTech Connect (OSTI)

    1995-12-01

    A 33-person panel recently convened by Future Technology Surveys, Inc., identified a series of the most important IPP trends to have occurred int the past five years, and forecast what will happen in this volatile market over the next five years. The survey was designed to present viewpoints of experts in the United States and was intentionally not international in scope. The most important trends from 1989--1994 are ranked in order of importance as: global market; retail wheeling/open access; exempt wholesale generators (EWGs); Energy Policy Act 1992; increased competition; transmission (better access and policy changes); consolidation of industry; bulk power marketing and sales; open competitive bidding; and almost exclusive shift to large gas projects. There is shift in emphasis, and the introduction of new trends, in IPP executive prediction for the future (1995--1999). Their views, in order of importance, are: retail wheeling; increased globalization; consolidation of industry; competition and direct competition with utilities; open access transmission; restructuring of entire power utility industry; deregulation; electricity as a commodity; and unbundling of integrated monopolies.

  14. Program Evaluation: Independence, Conflict of Interest, Openness |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Planning & Conducting Evaluations » Program Evaluation: Independence, Conflict of Interest, Openness Program Evaluation: Independence, Conflict of Interest, Openness This page discusses the aspects of independence, conflict of interest, and public vs. closed sessions, in preparation for successful peer reviews. Independence The review leader and the program manager should decide at the outset the desired level of independence and the degree of external control for

  15. Independent Verification and Validation Of SAPHIRE 8 Risk Management Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2009-11-01

    This report provides an evaluation of the risk management. Risk management is intended to ensure a methodology for conducting risk management planning, identification, analysis, responses, and monitoring and control activities associated with the SAPHIRE project work, and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  16. Independent Verification and Validation SAPHIRE Version 8 Final Report Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-04-01

    This report provides an evaluation of the SAPHIRE version 8 software product. SAPHIRE version 8 is being developed with a phased or cyclic iterative rapid application development methodology. Due to this approach, a similar approach has been taken for the IV&V activities on each vital software object. IV&V and Software Quality Assurance (SQA) activities occur throughout the entire development life cycle and therefore, will be required through the full development of SAPHIRE version 8. Later phases of the software life cycle, the operation and maintenance phases, are not applicable in this effort since the IV&V is being done prior to releasing Version 8.

  17. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Carl Wharton

    2009-10-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  18. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Carl Wharton; Kent Norris

    2010-03-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  19. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Carl Wharton; Kent Norris

    2009-12-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  20. Verification, validation, and predictive capability in computational engineering and physics.

    SciTech Connect (OSTI)

    Oberkampf, William Louis; Hirsch, Charles; Trucano, Timothy Guy

    2003-02-01

    Developers of computer codes, analysts who use the codes, and decision makers who rely on the results of the analyses face a critical question: How should confidence in modeling and simulation be critically assessed? Verification and validation (V&V) of computational simulations are the primary methods for building and quantifying this confidence. Briefly, verification is the assessment of the accuracy of the solution to a computational model. Validation is the assessment of the accuracy of a computational simulation by comparison with experimental data. In verification, the relationship of the simulation to the real world is not an issue. In validation, the relationship between computation and the real world, i.e., experimental data, is the issue.

  1. Bibliography for Verification and Validation in Computational Simulations

    SciTech Connect (OSTI)

    Oberkampf, W.L.

    1998-10-01

    A bibliography has been compiled dealing with the verification and validation of computational simulations. The references listed in this bibliography are concentrated in the field of computational fluid dynamics (CFD). However, references from the following fields are also included: operations research, heat transfer, solid dynamics, software quality assurance, software accreditation, military systems, and nuclear reactor safety. This bibliography, containing 221 references, is not meant to be comprehensive. It was compiled during the last ten years in response to the author's interest and research in the methodology for verification and validation. The emphasis in the bibliography is in the following areas: philosophy of science underpinnings, development of terminology and methodology, high accuracy solutions for CFD verification, experimental datasets for CFD validation, and the statistical quantification of model validation. This bibliography should provide a starting point for individual researchers in many fields of computational simulation in science and engineering.

  2. A Zero Knowledge Protocol For Nuclear Warhead Verification

    SciTech Connect (OSTI)

    Glaser, Alexander; Goldston, Robert J.

    2014-03-14

    The verification of nuclear warheads for arms control faces a paradox: International inspectors must gain high confidence in the authenticity of submitted items while learning nothing about them. Conventional inspection systems featuring ''information barriers'', designed to hide measurments stored in electronic systems, are at risk of tampering and snooping. Here we show the viability of fundamentally new approach to nuclear warhead verification that incorporates a zero-knowledge protocol, designed such that sensitive information is never measured so does not need to be hidden. We interrogate submitted items with energetic neutrons, making in effect, differential measurements of neutron transmission and emission. Calculations of diversion scenarios show that a high degree of discrimination can be achieved while revealing zero information. Timely demonstration of the viability of such an approach could be critical for the nexxt round of arms-control negotiations, which will likely require verification of individual warheads, rather than whole delivery systems.

  3. International comparison of product certification and verification methods for appliances

    SciTech Connect (OSTI)

    Zhou, Nan; Romankiewicz, John; Fridley, David; Zheng, Nina

    2012-06-01

    Enforcement of appliance standards and consumer trust in appliance labeling are important foundations of growing a more energy efficient economy. Product certification and verification increase compliance rates which in turn increase both energy savings and consumer trust. This paper will serve two purposes: 1) to review international practices for product certification and verification as they relate to the enforcement of standards and labeling programs in the U.S., E.U., Australia, Japan, Canada, and China; and 2) to make recommendations for China to implement improved certification processes related to their mandatory standards and labeling program such as to increase compliance rates and energy savings potential.

  4. A golden anniversary for space-based treaty verification

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A golden anniversary for space-based treaty verification A golden anniversary for space-based treaty verification Fifty years ago this month, LANL sensor technology lifted off into space to help verify that world Superpowers were abiding by the newly signed Limited Test Ban Treaty. October 22, 2013 Los Alamos National Laboratory researcher Richard Belian performs a final check of the Vela V-B satellite prior to its launch in April 1970. Vela V-B was the last of the Vela twin satellites launched

  5. International Comparison of Product Certification and Verification Methods for Appliances

    SciTech Connect (OSTI)

    Zhou, Nan; Romankiewicz, John; Fridley, David; Zheng, Nina

    2012-06-01

    Enforcement of appliance standards and consumer trust in appliance labeling are important foundations of growing a more energy efficient economy. Product certification and verification increase compliance rates which in turn increase both energy savings and consumer trust. This paper will serve two purposes: 1) to review international practices for product certification and verification as they relate to the enforcement of standards and labeling programs in the U.S., E.U., Australia, Japan, Canada, and China; and 2) to make recommendations for China to implement improved certification processes related to their mandatory standards and labeling program such as to increase compliance rates and energy savings potential.

  6. Verification of warhead dismantelment and the importance of baseline validation

    SciTech Connect (OSTI)

    Buonpane, L.M.; Strait, R.S. )

    1991-01-01

    This paper presents an approach for evaluating verification regimes for nuclear warhead dismantlement. The approach is an adaptation of the traditional nuclear materials management model. As such the approach integrates the difficulties of verifying both stockpile estimates and numbers of warheads dismantled. Both random uncertainties and systematic uncertainties are considered in this approach. By making some basic assumptions about the relative uncertainties surrounding the stockpile estimates and the numbers of warheads dismantled, the authors illustrate their relative impacts on overall verification ability. The results highlight the need for increased attention on the problem of validating baseline declarations of stockpile size.

  7. Field Scale Test and Verification of CHP System at the Ritz Carlton...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Field Scale Test and Verification of CHP System at the Ritz Carlton, San Francisco, August 2007 Field Scale Test and Verification of CHP System at the Ritz Carlton, San Francisco, ...

  8. Comment submitted by InterMetro Industries Corp. regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by InterMetro Industries Corp. regarding the Energy Star Verification Testing Program

  9. Comment submitted by Hobart/ITW Food Equipment Group regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by Hobart/ITW Food Equipment Group regarding the Energy Star Verification Testing Program

  10. Comment submitted by Hoshizaki America, Inc. regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by Hoshizaki America, Inc. regarding the Energy Star Verification Testing Program

  11. Comment submitted by Ingersoll Rand Residential Solutions regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by Ingersoll Rand Residential Solutions regarding the Energy Star Verification Testing Program

  12. Comment submitted by United Lighting, Inc. regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by United Lighting, Inc. regarding the Energy Star Verification Testing Program

  13. EECLP Webinar #2: Quality Assurance and Evaluation Monitoring Verification-- Text Version

    Broader source: Energy.gov [DOE]

    Below is the text version of the EECLP Webinar 2: Quality Assurance and Evaluation Monitoring Verification, presented in December 2014.

  14. Comment submitted by BSH Home Appliances Corporation regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by BSH Home Appliances Corporation regarding the Energy Star Verification Testing Program

  15. Measurement and Verification Plan and Savings Calculations Methods Outline (IDIQ Attachment J-8)

    Broader source: Energy.gov [DOE]

    Document outlines measurement and verification (M&V) planning and savings calculation methods for an energy savings performance contract (ESPC).

  16. Comment submitted by the Natural Resources Defense Council (NRDC) regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by the Natural Resources Defense Council (NRDC) regarding the Energy Star Verification Testing Program

  17. DOE Verification Testing in Support of ENERGY STAR, April 22, 2011 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Verification Testing in Support of ENERGY STAR, April 22, 2011 DOE Verification Testing in Support of ENERGY STAR, April 22, 2011 This document describes ENERGY STAR verificaion testing process, dated April 22, 2011 estar_verification_process.pdf (368.74 KB) More Documents & Publications Comment submitted by Hoshizaki America, Inc. regarding the Energy Star Verification Testing Program Comment submitted by the North American Association of Food Equipment

  18. Comment submitted by CertainTeed Corporation regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by CertainTeed Corporation regarding the Energy Star Verification Testing Program

  19. Measurement and Verification Activities Required in the Energy Savings Performance Contract Process

    Broader source: Energy.gov [DOE]

    There are four major measurement and verification (M&V) activities in the energy savings performance contract (ESPC) procurement process.

  20. Comment submitted by the Bradford White Corporation (BWC) regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by the Bradford White Corporation (BWC) regarding the Energy Star Verification Testing Program

  1. Comment submitted by Energizer Battery Manufacturing, Inc. regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by Energizer Battery Manufacturing, Inc. regarding the Energy Star Verification Testing Program

  2. ORO Verification of Employment Tracking System(VETS) PIA, Oak ridge

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operations Office | Department of Energy Verification of Employment Tracking System(VETS) PIA, Oak ridge Operations Office ORO Verification of Employment Tracking System(VETS) PIA, Oak ridge Operations Office ORO Verification of Employment Tracking System(VETS) PIA, Oak ridge Operations Office ORO Verification of Employment Tracking System(VETS) PIA, Oak ridge Operations Office (72.39 KB) More Documents & Publications ORO Office Safeguards and Security Clearance Tracking System and

  3. Comment submitted by the Alliance for Water Efficiency (AWE) regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by the Alliance for Water Efficiency (AWE) regarding the Energy Star Verification Testing Program

  4. Comment submitted by A. O. Smith Corporation regarding the Energy Star Verification Testing Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document is a comment submitted by A. O. Smith Corporation regarding the Energy Star Verification Testing Program

  5. TARGETED TECHNOLOGY TRANSFER TO US INDEPENDENTS

    SciTech Connect (OSTI)

    Donald F. Duttlinger; E. Lance Cole

    2005-01-01

    The Petroleum Technology Transfer Council (PTTC) continued pursuing its mission of assisting U.S. independent oil and gas producers with timely, informed technology decisions during Fiscal Year 2004 (FY04). PTTC has active grassroots programs through its 10 Regional Lead Organizations (RLOs) and 2 satellite offices. They bring research and academia to the table via their association with geological surveys and engineering departments. The regional directors interact with independent oil and gas producers through technology workshops, resource centers, websites, newsletters, technical publications and other cooperative outreach efforts. PTTC's Headquarters (HQ) staff receives direction from a National Board of Directors predominantly comprised of American natural gas and oil producers to plan and manage the overall technology transfer program. PTTC HQ implements a comprehensive communications program by interconnecting the talents of the National Board, 10 Regional Producer Advisory Groups (PAG) and the RLOs with industry across the U.S. PTTC effectively combines federal funding through the Department of Energy's (DOE) Office of Fossil Energy, namely the Strategic Center for Natural Gas and Oil with state and industry contributions to share application of upstream technologies. Ultimately, these efforts factor in to provide a safe, secure and reliable energy supply for American consumers. This integrated resource base, combined with industry volunteers guiding PTTC's activities and the dedication of national and regional staff, are achieving notable results regarding domestic production figures. PTTC is increasingly recognized as a critical resource for information and access to technologies by providing direct contact with research, development and demonstration (RD&D) results. A key to the program is demonstrating proven technologies that can be applied broadly and rapidly. This technical progress report summarizes PTTC's accomplishments during FY04. Activities

  6. Final Report - Verification Survey of the Hot Cell Facility Site, General Atomics, San Diego, California.

    Office of Legacy Management (LM)

  7. NMSSUP Phase 2 Transition/Readiness Verification Workshop

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nuclear Material Safeguards and Security Upgrade Project (NMSSUP) Phase II Transition/Readiness Verification Workshop Tuesday, April 30, 2013 Hilton Santa Fe Buffalo Thunder, Santa Fe, New Mexico Room reservation info Tewa Bay Meeting Room 1 Hosted by Los Alamos National Laboratory and NA-00-LA Field Office nmssup aerial Los Alamos National Laboratory, Technical Area 55

  8. Project W-030 flammable gas verification monitoring test

    SciTech Connect (OSTI)

    BARKER, S.A.

    1999-02-24

    This document describes the verification monitoring campaign used to document the ability of the new ventilation system to mitigate flammable gas accumulation under steady state tank conditions. This document reports the results of the monitoring campaign. The ventilation system configuration, process data, and data analysis are presented.

  9. Extremely accurate sequential verification of RELAP5-3D

    SciTech Connect (OSTI)

    Mesina, George L.; Aumiller, David L.; Buschman, Francis X.

    2015-11-19

    Large computer programs like RELAP5-3D solve complex systems of governing, closure and special process equations to model the underlying physics of nuclear power plants. Further, these programs incorporate many other features for physics, input, output, data management, user-interaction, and post-processing. For software quality assurance, the code must be verified and validated before being released to users. For RELAP5-3D, verification and validation are restricted to nuclear power plant applications. Verification means ensuring that the program is built right by checking that it meets its design specifications, comparing coding to algorithms and equations and comparing calculations against analytical solutions and method of manufactured solutions. Sequential verification performs these comparisons initially, but thereafter only compares code calculations between consecutive code versions to demonstrate that no unintended changes have been introduced. Recently, an automated, highly accurate sequential verification method has been developed for RELAP5-3D. The method also provides to test that no unintended consequences result from code development in the following code capabilities: repeating a timestep advancement, continuing a run from a restart file, multiple cases in a single code execution, and modes of coupled/uncoupled operation. In conclusion, mathematical analyses of the adequacy of the checks used in the comparisons are provided.

  10. SRS Software Verification Pre Operational and Startup Test

    SciTech Connect (OSTI)

    HILL, L.F.

    2000-10-18

    This document defines testing for the software used to control the Sodium Removal System (SRS). The testing is conducted off-line from the. physical plant by using a simulator built-in to the software. This provides verification of proper software operation prior to performing the operational acceptance tests with the actual plant hardware.

  11. Extremely accurate sequential verification of RELAP5-3D

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Mesina, George L.; Aumiller, David L.; Buschman, Francis X.

    2015-11-19

    Large computer programs like RELAP5-3D solve complex systems of governing, closure and special process equations to model the underlying physics of nuclear power plants. Further, these programs incorporate many other features for physics, input, output, data management, user-interaction, and post-processing. For software quality assurance, the code must be verified and validated before being released to users. For RELAP5-3D, verification and validation are restricted to nuclear power plant applications. Verification means ensuring that the program is built right by checking that it meets its design specifications, comparing coding to algorithms and equations and comparing calculations against analytical solutions and method ofmore » manufactured solutions. Sequential verification performs these comparisons initially, but thereafter only compares code calculations between consecutive code versions to demonstrate that no unintended changes have been introduced. Recently, an automated, highly accurate sequential verification method has been developed for RELAP5-3D. The method also provides to test that no unintended consequences result from code development in the following code capabilities: repeating a timestep advancement, continuing a run from a restart file, multiple cases in a single code execution, and modes of coupled/uncoupled operation. In conclusion, mathematical analyses of the adequacy of the checks used in the comparisons are provided.« less

  12. Cleanup Verification Package for the 118-F-6 Burial Ground

    SciTech Connect (OSTI)

    H. M. Sulloway

    2008-10-02

    This cleanup verification package documents completion of remedial action for the 118-F-6 Burial Ground located in the 100-FR-2 Operable Unit of the 100-F Area on the Hanford Site. The trenches received waste from the 100-F Experimental Animal Farm, including animal manure, animal carcasses, laboratory waste, plastic, cardboard, metal, and concrete debris as well as a railroad tank car.

  13. Superior Energy Performance Measurement and Verification Protocol for Industry

    Broader source: Energy.gov [DOE]

    This Measurement and Verification Protocol for Industry defines the procedures that will be used to confirm conformance with the energy performance level requirements of the Superior Energy Performance® (SEP™) Program. The Program has two paths. This document is structured to reflect those different paths.

  14. Small Wind Independent Testing (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2010-09-01

    This fact sheet describes the Small Wind Independent Testing at the NWTC and the Regional Test Centers project.

  15. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Environmental Management (EM)

    Laboratory Chemistry and Metallurgy Research Facility - January 2012 Independent Oversight Review, Los Alamos National Laboratory Chemistry and Metallurgy Research Facility - ...

  16. Independent Oversight Inspection, Sandia National Laboratories...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sandia National Laboratories, Summary Report - February 2003 Independent Oversight Inspection, Sandia National Laboratories, Summary Report - February 2003 February 2003 Inspection ...

  17. Independent Oversight Activity Report, Pacific Northwest National...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pacific Northwest National Laboratory - January 2014 Independent Oversight Activity Report, Pacific Northwest National Laboratory - January 2014 February 2014 PNNL Corrective...

  18. Independent Activity Report, Sandia National Laboratories - September...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 2012 Independent Activity Report, Sandia National Laboratories - September 2012 September 2012 Operational Awareness Oversight of Sandia National Laboratories HIAR ...

  19. Quality Procedure - Independent Assessments | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Assessments Quality Procedure - Independent Assessments This procedure establishes the process for planning, performing, and reporting Independent Assessments (i.e., assist visits, program/project reviews, direct observations, etc.) as conducted by the Office of Standards and Quality Assurance. Independent assessments are performed at EM Headquarters and Field Offices to determine compliance to requirements and to identify systemic issues, potential risk, emerging issues, and for

  20. Independent Oversight Review, West Valley Demonstration Project...

    Office of Environmental Management (EM)

    West Valley Demonstration Project Transportation - September 2000 Independent Oversight Review, West Valley Demonstration Project Transportation - September 2000 September 2000 ...

  1. 2012 Independent Communication and Outreach Stakeholder Satisfaction...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE-LM periodically surveys its stakeholders to collect their feedback on DOE-LM performance at both a local and national level. The first customer satisfaction survey was ...

  2. redMaGiC. Selecting Luminous Red Galaxies from the DES Science Verification Data

    SciTech Connect (OSTI)

    Rozo, E.

    2015-07-20

    We introduce redMaGiC, an automated algorithm for selecting Luminous Red Galaxies (LRGs). The algorithm was developed to minimize photometric redshift uncertainties in photometric large-scale structure studies. redMaGiC achieves this by self-training the color-cuts necessary to produce a luminosity-thresholded LRG sam- ple of constant comoving density. Additionally, we demonstrate that redMaGiC photo-zs are very nearly as accurate as the best machine-learning based methods, yet they require minimal spectroscopic training, do not suffer from extrapolation biases, and are very nearly Gaussian. We apply our algorithm to Dark Energy Survey (DES) Science Verification (SV) data to produce a redMaGiC catalog sampling the redshift range z ϵ [0.2,0.8]. Our fiducial sample has a comoving space density of 10-3 (h-1Mpc)-3, and a median photo-z bias (zspec zphoto) and scatter (σz=(1 + z)) of 0.005 and 0.017 respectively.The corresponding 5σ outlier fraction is 1.4%. We also test our algorithm with Sloan Digital Sky Survey (SDSS) Data Release 8 (DR8) and Stripe 82 data, and discuss how spectroscopic training can be used to control photo-z biases at the 0.1% level.

  3. Multi-canister overpack project -- verification and validation, MCNP 4A

    SciTech Connect (OSTI)

    Goldmann, L.H.

    1997-11-10

    This supporting document contains the software verification and validation (V and V) package used for Phase 2 design of the Spent Nuclear Fuel Multi-Canister Overpack. V and V packages for both ANSYS and MCNP are included. Description of Verification Run(s): This software requires that it be compiled specifically for the machine it is to be used on. Therefore to facilitate ease in the verification process the software automatically runs 25 sample problems to ensure proper installation and compilation. Once the runs are completed the software checks for verification by performing a file comparison on the new output file and the old output file. Any differences between any of the files will cause a verification error. Due to the manner in which the verification is completed a verification error does not necessarily indicate a problem. This indicates that a closer look at the output files is needed to determine the cause of the error.

  4. Robotic Surveying

    SciTech Connect (OSTI)

    Suzy Cantor-McKinney; Michael Kruzic

    2007-03-01

    -actuated functions to be controlled by an onboard computer. The computer-controlled Speedrower was developed at Carnegie Mellon University to automate agricultural harvesting. Harvesting tasks require the vehicle to cover a field using minimally overlapping rows at slow speeds in a similar manner to geophysical data acquisition. The Speedrower had demonstrated its ability to perform as it had already logged hundreds of acres of autonomous harvesting. This project is the first use of autonomous robotic technology on a large-scale for geophysical surveying.

  5. Retrospective analysis of 2D patient-specific IMRT verifications

    SciTech Connect (OSTI)

    Childress, Nathan L.; White, R. Allen; Bloch, Charles; Salehpour, Mohammad; Dong, Lei; Rosen, Isaac I.

    2005-04-01

    We performed 858 two-dimensional (2D) patient-specific intensity modulated radiotherapy verifications over a period of 18 months. Multifield, composite treatment plans were measured in phantom using calibrated Kodak EDR2 film and compared with the calculated dose extracted from two treatment planning systems. This research summarizes our findings using the normalized agreement test (NAT) index and the percent of pixels failing the gamma index as metrics to represent the agreement between measured and computed dose distributions. An in-house dose comparison software package was used to register and compare all verifications. We found it was important to use an automatic positioning algorithm to achieve maximum registration accuracy, and that our automatic algorithm agreed well with anticipated results from known phantom geometries. We also measured absolute dose for each case using an ion chamber. Because the computed distributions agreed with ion chamber measurements better than the EDR2 film doses, we normalized EDR2 data to the computed distributions. The distributions of both the NAT indices and the percentage of pixels failing the gamma index were found to be exponential distributions. We continue to use both the NAT index and percent of pixels failing gamma with 5%/3 mm criteria to evaluate future verifications, as these two metrics were found to be complementary. Our data showed that using 2%/2 mm or 3%/3 mm criteria produces results similar to those using 5%/3 mm criteria. Normalized comparisons that have a NAT index greater than 45 and/or more than 20% of the pixels failing gamma for 5%/3 mm criteria represent outliers from our clinical data set and require further analysis. Because our QA verification results were exponentially distributed, rather than a tight grouping of similar results, we continue to perform patient-specific QA in order to identify and correct outliers in our verifications. The data from this work could be useful as a reference for

  6. Independent Oversight Focused Program Review, Argonne National

    Office of Environmental Management (EM)

    Laboratory-West - May 2001 | Department of Energy Program Review, Argonne National Laboratory-West - May 2001 Independent Oversight Focused Program Review, Argonne National Laboratory-West - May 2001 May 2001 Focused Program Review at Argonne National Laboratory-West This report provides the results of an independent focused review of the Emergency Management Program at the Department of Energy's Argonne National Laboratory-West site that was conducted by the Office of Independent Oversight

  7. Independent Study Form | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy Independent Oversight Review, Los Alamos National Laboratory - April 2012 Independent Oversight Review, Los Alamos National Laboratory - April 2012 April 2012 Review of the Emergency Response Organization at the Los Alamos National Laboratory This report provides the results of an independent review of the Los Alamos National Laboratory emergency response organization program that was conducted February 7-9, 2012, by the Office of Safety and Emergency Management

  8. Renewable Energy and the International Performance Measurement and Verification Protocol

    SciTech Connect (OSTI)

    Walker, A.; Thompson, A.; Mills, D.; Kats, G. H.

    1999-04-14

    The Renewables Subcommittee for the International Performance Measurement and Verification Protocol (IPMVP) is developing a section of the IPMVP treating the special issues related to performance measurement of renewable energy systems. An industry consensus framework for measuring project benefits is important in realizing the promise of renewable energy. This work represents a voluntary, consensus-building process among sponsoring organizations from 21 countries and several disciplines. Measurement and Verification (M&V) can provide a common tool for standardization to support performance-based contracting, financing, and emissions trading. M&V can ensure that savings and generation requirements in energy projects will be achieved accurately and objectively. The protocol defines procedures that are consistently applicable to similar projects, internationally accepted, and reliable. Actual M&V project results can demonstrate success and provide developers, investors, lenders, and customers with more confidence in the value of future projects.

  9. Renewable energy and the International Performance Measurement and Verification Protocol

    SciTech Connect (OSTI)

    Walker, A.; Thompson, A.; Mills, D.; Kats, G.H.

    1999-07-01

    The Renewables Subcommittee for the International Performance Measurement and Verification Protocol (IPMVP) is developing a section of the IPMVP treating the special issues related to performance measurement of renewable energy systems. An industry consensus framework for measuring project benefits is important in realizing the promise of renewable energy. This work represents a voluntary, consensus-building process among sponsoring organizations from 21 countries and several disciplines. Measurement and Verification (M and V) can provide a common tool for standardization to support performance-based contracting, financing, and emissions trading. M and V can ensure that savings and generation requirements in energy projects will be achieved accurately and objectively. The protocol defines procedures that are consistently applicable to similar projects, internationally accepted, and reliable. Actual M and V project results can demonstrate success and provide developers, investors, lenders, and customers with more confidence in the value of future projects.

  10. The 2014 Sandia Verification and Validation Challenge: Problem statement

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Hu, Kenneth; Orient, George

    2016-01-18

    This paper presents a case study in utilizing information from experiments, models, and verification and validation (V&V) to support a decision. It consists of a simple system with data and models provided, plus a safety requirement to assess. The goal is to pose a problem that is flexible enough to allow challengers to demonstrate a variety of approaches, but constrained enough to focus attention on a theme. This was accomplished by providing a good deal of background information in addition to the data, models, and code, but directing the participants' activities with specific deliverables. In this challenge, the theme ismore » how to gather and present evidence about the quality of model predictions, in order to support a decision. This case study formed the basis of the 2014 Sandia V&V Challenge Workshop and this resulting special edition of the ASME Journal of Verification, Validation, and Uncertainty Quantification.« less

  11. Independent Oversight Special Review, Bechtel Jacobs Company...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bechtel Jacobs Company, LLC - July 2011 Independent Oversight Special Review, Bechtel Jacobs Company, LLC - July 2011 July 2011 Special Review of the SuspectCounterfeit Items ...

  12. Independent Energy Solutions | Open Energy Information

    Open Energy Info (EERE)

    navigation, search Name: Independent Energy Solutions Address: 1090 Joshua Way Place: Vista, California Zip: 92081 Region: Southern CA Area Sector: Solar Product: Renewable...

  13. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant...

    Office of Environmental Management (EM)

    The contractor at PORTS is Fluor-Babcock & Wilcox Portsmouth (FBP). The HSS Office of Safety and Emergency Management Evaluations performed the onsite portion of the Independent ...

  14. Independent Oversight Special Review, Headquarters - August 2008...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Independent Oversight Special Review, Department of Energy sites - February 2008 Focus Group Meeting (Topical Meeting) 10 CFR 851 Worker Safety and ...

  15. External Independent Review (EIR) Standard Operating Procedure...

    Office of Environmental Management (EM)

    Standard Operating Procedure (SOP) May 2016 External Independent Review (EIR) Standard ... The objectives of this EIR Standard Operating Procedure (SOP) document are to clarify EIR ...

  16. Independent Oversight Review, Waste Treatment and Immobilization...

    Broader source: Energy.gov (indexed) [DOE]

    Hanford Site Waste Treatment and Immobilization Plant Project Construction Quality This report documents the results of an independent oversight review of selected aspects of...

  17. Independent Oversight Inspection of Environment, Safety, and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Health Programs at the Savannah River Operations Office and Savannah River Site, January 2010 Independent Oversight Inspection of Environment, Safety, and Health Programs ...

  18. Independent Oversight Review, Advanced Mixed Waste Treatment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Advanced Mixed Waste Treatment Project - April 2013 Independent Oversight Review, Advanced Mixed Waste Treatment Project - April 2013 April 2013 Review of Radiation Protection...

  19. Independent Oversight Review, Richland Operations Office - November...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Richland Operations Office - November 2012 Independent Oversight Review, Richland Operations Office - November 2012 November 2012 Review of the Richland Operations Office Oversight...

  20. Bell Independent Power Corporation | Open Energy Information

    Open Energy Info (EERE)

    Sector: Biofuels, Biomass, Services Product: BIP provides engineering, financial and feasibility services for biofuels, biomass and STEG projects. References: Bell Independent...

  1. Independent Oversight Inspection, Savannah River Site Office...

    Energy Savers [EERE]

    Office - December 2009 Independent Oversight Inspection, Savannah River Site Office - December 2009 December 2009 Inspection of Nuclear Safety at the Savannah River Site Office and ...

  2. Independent Oversight Inspection, Savannah River Site - January...

    Energy Savers [EERE]

    Independent Oversight Inspection, Savannah River Site - January 2010 January 2010 Inspection of Emergency Management at the Savannah River Site This report provides the results of ...

  3. External Independent Review (EIR) Standard Operating Procedure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Office of Project Management Oversight and Assessments (PMOA) performs External Independent Reviews (EIRs) to provide Project Management Executives (PMEs), senior leaders ...

  4. Independent Oversight Targeted Review, Sandia National Laboratories...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 2014 Independent Oversight Targeted Review, Sandia National Laboratories - April 2014 April 2014 Targeted Review of the Sandia National Laboratories Federal Assurance ...

  5. Independent Oversight Review of Integrated Safety Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... on LSO's most recent assessment of LLNL's contractor ... and the request for peer reviews and independent HSS reviews, show that LSO is a learning organization and that ...

  6. Independent Oversight Environment, Oak Ridge National Laboratory...

    Broader source: Energy.gov (indexed) [DOE]

    This report documents the results of an inspection of the environment, safety, and health ... of Independent Oversight's Office of Environment, Safety and Health Evaluations, within ...

  7. Independent Oversight Review, Nevada National Security - May...

    Office of Environmental Management (EM)

    National Security - May 2013 Independent Oversight Review, Nevada National Security - May 2013 May 2013 Review of the Nevada National Security Site Criticality Safety Program ...

  8. Independent Oversight Review, Sodium Bearing Waste Treatment...

    Office of Environmental Management (EM)

    This report documents the results of an independent review of the Sodium Bearing Waste Treatment Project-Integrated Waste Treatment Unit Federal Operational Readiness Review. ...

  9. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Environmental Management (EM)

    The independent review was one part of a targeted assessment of fire protection at nuclear facilities across the DOE complex, including National Nuclear Security Administration ...

  10. Independent Natural Resources Inc | Open Energy Information

    Open Energy Info (EERE)

    Zip: 55344 Product: Designer of a wave converter system. Has patented the SEADOG Pump which uses buoyancy to convert ave energy to mechanical energy. References: Independent...

  11. Independent Activity Report, Lawrence Livermore National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    October 2012 Independent Activity Report, Lawrence Livermore National Laboratory - October 2012 October 2012 Lawrence Livermore National Laboratory Site Lead Planning Activities...

  12. Independent Oversight Activity Report, Hanford Sludge Treatment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sludge Treatment Project - September 2013 Independent Oversight Activity Report, Hanford Sludge Treatment Project - September 2013 November 2013 Hanford Sludge Treatment Project...

  13. Independent Activity Report, Waste Treatment and Immobilization...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste Treatment and Immobilization Plant - March 2013 Independent Activity Report, Waste Treatment and Immobilization Plant - March 2013 March 2013 Follow-up of Waste Treatment and...

  14. Independent Oversight Activity Report, Hanford Waste Treatment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    July 2013 Independent Oversight Activity Report, Hanford Waste Treatment and Immobilization Plant - July 2013 July 2013 Operational Awareness of Waste Treatment and Immobilization...

  15. Independent Activity Report, Los Alamos National Laboratory ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    July 2012 Independent Activity Report, Los Alamos National Laboratory - July 2012 July 2012 Initial Meeting of Representatives from LANL, LASO, and HS-45 To Review Progress and...

  16. Independent Oversight Activity Report, Savannah River Site -...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - February 2014 Independent Oversight Activity Report, Savannah River Site - February 2014 February 2014 Operational Awareness Visit of the Savannah River Site...

  17. Independent Oversight Activity Report, Nevada National Security...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 3-6, 2014 Independent Oversight Activity Report, Nevada National Security Site - March 3-6, 2014 March 2014 Operational Awareness Oversight of the Nevada National Security...

  18. Independent Oversight Activity Report, National Nuclear Security...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Security Administration Production Office - March 10-14, 2014 Independent Oversight Activity Report, National Nuclear Security Administration Production Office - March 10-14,...

  19. Independent Activity Report, Defense Nuclear Facilities Safety...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Defense Nuclear Facilities Safety Board Public Meeting - October 2012 Independent Activity Report, Defense Nuclear Facilities Safety Board Public Meeting - October 2012 October...

  20. Independent Activity Report, Los Alamos National Laboratory ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 2012 Independent Activity Report, Los Alamos National Laboratory - August 2012 August 2012 Defense Nuclear Facilities Safety Board Visit and Site Lead Planning Activities...

  1. Independent Activity Report, West Valley Demonstration Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    West Valley Demonstration Project - July 2012 Independent Activity Report, West Valley Demonstration Project - July 2012 July 2012 Operational Awareness Oversight of the West...

  2. Independent Oversight Activity Report, Idaho Cleanup Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Idaho Cleanup Project - November 2013 Independent Oversight Activity Report, Idaho Cleanup Project - November 2013 November 2013 Pre-restart Visit to the Integrated Waste Treatment...

  3. Independent Activity Report, Hanford Sludge Treatment Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sludge Treatment Project - February 2012 Independent Activity Report, Hanford Sludge Treatment Project - February 2012 February 2012 Hanford Sludge Treatment Project Operational...

  4. Independent Oversight Activity Report, Hanford Waste Treatment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    June 2013 Independent Oversight Activity Report, Hanford Waste Treatment and Immobilization Plant - June 2013 June 2013 Hanford Waste Treatment and Immobilization Plant Low...

  5. Background Information for Independent Review Team. Lifecycle...

    Office of Scientific and Technical Information (OSTI)

    Background Information for Independent Review Team. Lifecycle Plan and FY14 Quarterly ... Visit OSTI to utilize additional information resources in energy science and technology. A ...

  6. Independent Oversight Review, DOE Headquarters Facilities - March...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review of the Headquarters Facilities Emergency Response Plans This report provides the results of an independent review of the emergency response plans for the Department of ...

  7. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review of the Consequence Assessment Program at the Los Alamos National Laboratory This report provides the results of an independent review of the Los Alamos National Laboratory ...

  8. Independent Oversight Review, Rocky Flats Environmental Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review of the Rocky Flats Environmental Technology Site Transportation Emergency Management Program This report provides the results of an independent review of the Transportation ...

  9. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review of the Emergency Response Organization at the Los Alamos National Laboratory This report provides the results of an independent review of the Los Alamos National Laboratory ...

  10. Independent Activity Report, Sandia National Laboratories - March...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 2013 Independent Activity Report, Sandia National Laboratories - March 2013 March 2013 Operational Awareness Oversight of Sandia National Laboratories HIAR SNL-2013-03-18 ...

  11. Independent Activity Report, Sandia National Laboratories - January...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January 2012 Independent Activity Report, Sandia National Laboratories - January 2012 January 2012 Sandia National Laboratories Orientation Visit HIAR-SNL-2012-01-04 This ...

  12. Independent Activity Report, Nevada National Security Site -...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nevada National Security Site Operational Awareness Visit HIAR NNSS-2012-12-03 This Independent Activity Report documents an operational awareness oversight activity conducted by ...

  13. Independent Activity Report, Argonne National Laboratory - August...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This Independent Activity Report documents an operational awareness activity conducted by ... increase HSS personnel's operational awareness of the site's activities, and identify ...

  14. Independent Activity Report, Nevada National Security Site -...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 2012 Operational Awareness Oversight of the Nevada National Security Site HIAR NNSS-2012-08-16 This Independent Activity Report documents an operational awareness ...

  15. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    Independent Oversight Review, Waste Treatment and Immobilization Plant Project - October 2010 October 2010 Review of Nuclear Safety Culture at the Hanford Site Waste Treatment and ...

  16. Independent Oversight Review, Sodium Bearing Waste Treatment...

    Office of Environmental Management (EM)

    Independent Oversight Review, Sodium Bearing Waste Treatment Project - Contractor - June 2012 June 2012 Review of the Sodium Bearing Waste Treatment Project - Integrated Waste ...

  17. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    January 2013 Independent Oversight Review, Waste Treatment and Immobilization Plant - January 2013 January 2013 Review of the Hanford Waste Treatment and Immobilization Plant ...

  18. Independent Oversight Activity Report, Hanford Waste Treatment...

    Office of Environmental Management (EM)

    Independent Oversight Activity Report, Hanford Waste Treatment and Immobilization Plant - ... Conducted in Support of Hanford Site Waste Treatment and Immobilization Plant Select ...

  19. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    October 2012 Independent Oversight Review, Waste Treatment and Immobilization Plant - October 2012 October 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant ...

  20. Independent Oversight Assessment, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    Waste Treatment and Immobilization Plant - January 2012 Independent Oversight Assessment, Waste Treatment and Immobilization Plant - January 2012 January 2012 Assessment of the ...

  1. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    May 2013 Independent Oversight Review, Waste Treatment and Immobilization Plant - May 2013 May 2013 Review of the Hanford Site Waste Treatment and Immobilization Plant Construction ...

  2. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    August 2012 Independent Oversight Review, Waste Treatment and Immobilization Plant - August 2012 August 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant ...

  3. Independent Oversight Review, Richland Operations Office and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and work management and control processes in the areas of conduct of operations, quality assurance, and integrated safety management. Independent Oversight Review, Richland...

  4. Independent Oversight Evaluation, Office of Secure Transportation...

    Office of Environmental Management (EM)

    Emergency Management Program This report provides the results of an independent oversight evaluation of the emergency management program at the Department of Energy's (DOE) Office...

  5. Independent Activity Report, New Brunswick Laboratory - July...

    Broader source: Energy.gov (indexed) [DOE]

    HIAR NBL-2012-07-20 This Independent Activity Report documents an operational awareness activity conducted by Office of Health, Safety and Security's Office of Safety and...

  6. Independent Energy Corporation | Open Energy Information

    Open Energy Info (EERE)

    Independent Energy Corporation Place: Colton, California Zip: 92324 Sector: Hydro, Hydrogen Product: Generator planning to develop build large-scale modular Hydrogen production...

  7. Independent Oversight Review, Savannah River Operations Office...

    Office of Environmental Management (EM)

    - July 2013 July 2013 Review of the Employee Concerns Program at the Savannah River ... O 442.1, DEPARTMENT OF ENERGY EMPLOYEE CONCERNS PROGRAM Independent Activity ...

  8. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Health, Safety and Security (HSS), conducted an independent review of the Los Alamos National Laboratory (LANL) Weapons Engineering Tritium Facility (WETF) safety significant...

  9. External Independent Review (EIR) Standard Operating Procedure...

    Broader source: Energy.gov (indexed) [DOE]

    The objectives of this EIR Standard Operating Procedure (SOP) document are to clarify EIR ... PDF icon External Independent Review (EIR) Standard Operating Procedure (SOP), Revision 3, ...

  10. Independence Biofuels Inc | Open Energy Information

    Open Energy Info (EERE)

    Biofuels Inc Jump to: navigation, search Name: Independence Biofuels Inc Place: Middletown, Pennsylvania Zip: 17057 Sector: Renewable Energy, Vehicles Product: Provides clean,...

  11. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 2011 Independent Oversight Review, Los Alamos National Laboratory - September 2011 September 2011 Review of the Facility Centered Assessment of the Los Alamos National ...

  12. Supplemnental Volume - Independent Oversight Assessment of the...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of Health, Safety and Security HSS i Independent Oversight Assessment of Safety Culture and Management of Nuclear ... Program EM Office of Environmental Management EM-1 ...

  13. Independence, Ohio: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    district.12 Registered Energy Companies in Independence, Ohio Bio Energy LLC Energy Industries of Ohio Five Star Technologies References US Census Bureau...

  14. Independent Oversight Assessment, Pantex Plant - November 2012...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment, Pantex Plant - November 2012 November 2012 Assessment of Nuclear Safety Culture at the Pantex Plant This report provides the results of an independent assessment of...

  15. Independent Oversight Activity Report, Hanford Waste Treatment...

    Office of Environmental Management (EM)

    Independent Oversight Activity Report, Hanford Waste Treatment and Immobilization Plant and Tank Farm - January 2014 January 2014 Hanford Waste Treatment and Immobilization Plant ...

  16. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Oversight Review, Waste Treatment and Immobilization Plant - March 2012 March 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant Project ...

  17. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant...

    Office of Environmental Management (EM)

    Plant - November 2013 Independent Oversight Review, Portsmouth Gaseous Diffusion Plant - November 2013 November 5, 2013 Review of Preparedness for Severe Natural Phenomena Events ...

  18. Independent Oversight Review, Waste Treatment and Immobilization...

    Broader source: Energy.gov (indexed) [DOE]

    Plant Construction Quality This report documents the results of an independent oversight review of Construction Quality at the Hanford Site Waste Treatment and Immobilization Plant ...

  19. Independent Oversight Inspection, Pantex Plant, Summary Report...

    Office of Environmental Management (EM)

    Plant, Summary Report - November 2002 Independent Oversight Inspection, Pantex Plant, Summary Report - November 2002 November 2002 Inspection of Environment, Safety, and Health and ...

  20. Independent Activity Report, Portsmouth Gaseous Diffusion Plant...

    Office of Environmental Management (EM)

    Portsmouth Gaseous Diffusion Plant - August 2011 Independent Activity Report, Portsmouth Gaseous Diffusion Plant - August 2011 August 2011 Orientation Visit to the Portsmouth ...

  1. Independent Activity Report, Lawrence Livermore National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    February 2013 Independent Activity Report, Lawrence Livermore National Laboratory - February 2013 February 2013 Lawrence Livermore National Laboratory Operational Drill at the B332 ...

  2. Independent Activity Report, Lawrence Livermore National Laboratory...

    Office of Environmental Management (EM)

    March 2011 Independent Activity Report, Lawrence Livermore National Laboratory - March 2011 March 2011 Lawrence Livermore National Laboratory Chronic Beryllium Disease Prevention ...

  3. Independent Activity Report, Livermore Site Office - January...

    Office of Environmental Management (EM)

    Livermore Site Office - January 2011 Independent Activity Report, Livermore Site Office - January 2011 January 2011 Livermore Site Office Facility Representative Program Assessment ...

  4. Independent Oversight Review, Oak Ridge National Laboratory ...

    Energy Savers [EERE]

    National Laboratory - January 2013 Independent Oversight Review, Oak Ridge National Laboratory - January 2013 January 2013 Review of the Oak Ridge National Laboratory High Flux...

  5. California Independent System Operator | Open Energy Information

    Open Energy Info (EERE)

    search 200px Name: California Independent System Operator Address: California ISO P.O. Box 639014 Place: Folsom, California Zip: 95763-9014 Sector: Services Phone Number:...

  6. A comparison of adjoint and data-centric verification techniques.

    SciTech Connect (OSTI)

    Wildey, Timothy Michael; Cyr, Eric Christopher; Shadid, John Nicolas; Pawlowski, Roger Patrick; Smith, Thomas Michael

    2013-03-01

    This document summarizes the results from a level 3 milestone study within the CASL VUQ effort. We compare the adjoint-based a posteriori error estimation approach with a recent variant of a data-centric verification technique. We provide a brief overview of each technique and then we discuss their relative advantages and disadvantages. We use Drekar::CFD to produce numerical results for steady-state Navier Stokes and SARANS approximations. 3

  7. Code Verification of the HIGRAD Computational Fluid Dynamics Solver

    SciTech Connect (OSTI)

    Van Buren, Kendra L.; Canfield, Jesse M.; Hemez, Francois M.; Sauer, Jeremy A.

    2012-05-04

    The purpose of this report is to outline code and solution verification activities applied to HIGRAD, a Computational Fluid Dynamics (CFD) solver of the compressible Navier-Stokes equations developed at the Los Alamos National Laboratory, and used to simulate various phenomena such as the propagation of wildfires and atmospheric hydrodynamics. Code verification efforts, as described in this report, are an important first step to establish the credibility of numerical simulations. They provide evidence that the mathematical formulation is properly implemented without significant mistakes that would adversely impact the application of interest. Highly accurate analytical solutions are derived for four code verification test problems that exercise different aspects of the code. These test problems are referred to as: (i) the quiet start, (ii) the passive advection, (iii) the passive diffusion, and (iv) the piston-like problem. These problems are simulated using HIGRAD with different levels of mesh discretization and the numerical solutions are compared to their analytical counterparts. In addition, the rates of convergence are estimated to verify the numerical performance of the solver. The first three test problems produce numerical approximations as expected. The fourth test problem (piston-like) indicates the extent to which the code is able to simulate a 'mild' discontinuity, which is a condition that would typically be better handled by a Lagrangian formulation. The current investigation concludes that the numerical implementation of the solver performs as expected. The quality of solutions is sufficient to provide credible simulations of fluid flows around wind turbines. The main caveat associated to these findings is the low coverage provided by these four problems, and somewhat limited verification activities. A more comprehensive evaluation of HIGRAD may be beneficial for future studies.

  8. Cleanup Verification Package for the 618-3 Burial Ground

    SciTech Connect (OSTI)

    M. J. Appel

    2006-09-12

    This cleanup verification package documents completion of remedial action for the 618-3 Solid Waste Burial Ground, also referred to as Burial Ground Number 3 and the Dry Waste Burial Ground Number 3. During its period of operation, the 618-3 site was used to dispose of uranium-contaminated construction debris from the 311 Building and construction/demolition debris from remodeling of the 313, 303-J and 303-K Buildings.

  9. Ashtabula, Ohio, Site Fact Sheet

    Office of Legacy Management (LM)

    disposal facility. Cleanup was completed in September 2006. The Oak Ridge Institute of Science and Education in Oak Ridge, Tennessee, performed an independent verification survey...

  10. Enrichment Assay Methods Development for the Integrated Cylinder Verification System

    SciTech Connect (OSTI)

    Smith, Leon E.; Misner, Alex C.; Hatchell, Brian K.; Curtis, Michael M.

    2009-10-22

    International Atomic Energy Agency (IAEA) inspectors currently perform periodic inspections at uranium enrichment plants to verify UF6 cylinder enrichment declarations. Measurements are typically performed with handheld high-resolution sensors on a sampling of cylinders taken to be representative of the facility's entire product-cylinder inventory. Pacific Northwest National Laboratory (PNNL) is developing a concept to automate the verification of enrichment plant cylinders to enable 100 percent product-cylinder verification and potentially, mass-balance calculations on the facility as a whole (by also measuring feed and tails cylinders). The Integrated Cylinder Verification System (ICVS) could be located at key measurement points to positively identify each cylinder, measure its mass and enrichment, store the collected data in a secure database, and maintain continuity of knowledge on measured cylinders until IAEA inspector arrival. The three main objectives of this FY09 project are summarized here and described in more detail in the report: (1) Develop a preliminary design for a prototype NDA system, (2) Refine PNNL's MCNP models of the NDA system, and (3) Procure and test key pulse-processing components. Progress against these tasks to date, and next steps, are discussed.

  11. Monitoring and Commissioning Verification Algorithms for CHP Systems

    SciTech Connect (OSTI)

    Brambley, Michael R.; Katipamula, Srinivas; Jiang, Wei

    2008-03-31

    This document provides the algorithms for CHP system performance monitoring and commissioning verification (CxV). It starts by presenting system-level and component-level performance metrics, followed by descriptions of algorithms for performance monitoring and commissioning verification, using the metric presented earlier. Verification of commissioning is accomplished essentially by comparing actual measured performance to benchmarks for performance provided by the system integrator and/or component manufacturers. The results of these comparisons are then automatically interpreted to provide conclusions regarding whether the CHP system and its components have been properly commissioned and where problems are found, guidance is provided for corrections. A discussion of uncertainty handling is then provided, which is followed by a description of how simulations models can be used to generate data for testing the algorithms. A model is described for simulating a CHP system consisting of a micro-turbine, an exhaust-gas heat recovery unit that produces hot water, a absorption chiller and a cooling tower. The process for using this model for generating data for testing the algorithms for a selected set of faults is described. The next section applies the algorithms developed to CHP laboratory and field data to illustrate their use. The report then concludes with a discussion of the need for laboratory testing of the algorithms on a physical CHP systems and identification of the recommended next steps.

  12. AUTOMATED, HIGHLY ACCURATE VERIFICATION OF RELAP5-3D

    SciTech Connect (OSTI)

    George L Mesina; David Aumiller; Francis Buschman

    2014-07-01

    Computer programs that analyze light water reactor safety solve complex systems of governing, closure and special process equations to model the underlying physics. In addition, these programs incorporate many other features and are quite large. RELAP5-3D[1] has over 300,000 lines of coding for physics, input, output, data management, user-interaction, and post-processing. For software quality assurance, the code must be verified and validated before being released to users. Verification ensures that a program is built right by checking that it meets its design specifications. Recently, there has been an increased importance on the development of automated verification processes that compare coding against its documented algorithms and equations and compares its calculations against analytical solutions and the method of manufactured solutions[2]. For the first time, the ability exists to ensure that the data transfer operations associated with timestep advancement/repeating and writing/reading a solution to a file have no unintended consequences. To ensure that the code performs as intended over its extensive list of applications, an automated and highly accurate verification method has been modified and applied to RELAP5-3D. Furthermore, mathematical analysis of the adequacy of the checks used in the comparisons is provided.

  13. IAEA verification experiment at the Portsmouth Gaseous Diffusion Plant

    SciTech Connect (OSTI)

    Gordon, D.M.; Subudhi, M.; Calvert, O.L.; Bonner, T.N.; Adams, J.G.; Cherry, R.C.; Whiting, N.E.

    1998-08-01

    In April 1996, the United States (US) added the Portsmouth Gaseous Diffusion Plant to the list of facilities eligible for the application of International Atomic Energy Agency (IAEA) safeguards. At that time, the US proposed that the IAEA carry out a Verification Experiment at the plant with respect to the downblending of about 13 metric tons of highly enriched uranium (HEU) in the form of UF{sub 6}. This material is part of the 226 metric tons of fissile material that President Clinton has declared to be excess to US national-security needs and which will be permanently withdrawn from the US nuclear stockpile. In September 1997, the IAEA agreed to carry out this experiment, and during the first three weeks of December 1997, the IAEA verified the design information concerning the downblending process. The plant has been subject to short-notice random inspections since December 17, 1997. This paper provides an overview of the Verification Experiment, the monitoring technologies used in the verification approach, and some of the experience gained to date.

  14. STEP Participant Survey Report

    Broader source: Energy.gov [DOE]

    STEP Participant Survey Report, from the Tool Kit Framework: Small Town University Energy Program (STEP).

  15. Independent calculation of monitor units for VMAT and SPORT

    SciTech Connect (OSTI)

    Chen, Xin; Bush, Karl; Ding, Aiping; Xing, Lei

    2015-02-15

    Purpose: Dose and monitor units (MUs) represent two important facets of a radiation therapy treatment. In current practice, verification of a treatment plan is commonly done in dose domain, in which a phantom measurement or forward dose calculation is performed to examine the dosimetric accuracy and the MU settings of a given treatment plan. While it is desirable to verify directly the MU settings, a computational framework for obtaining the MU values from a known dose distribution has yet to be developed. This work presents a strategy to calculate independently the MUs from a given dose distribution of volumetric modulated arc therapy (VMAT) and station parameter optimized radiation therapy (SPORT). Methods: The dose at a point can be expressed as a sum of contributions from all the station points (or control points). This relationship forms the basis of the proposed MU verification technique. To proceed, the authors first obtain the matrix elements which characterize the dosimetric contribution of the involved station points by computing the doses at a series of voxels, typically on the prescription surface of the VMAT/SPORT treatment plan, with unit MU setting for all the station points. An in-house Monte Carlo (MC) software is used for the dose matrix calculation. The MUs of the station points are then derived by minimizing the least-squares difference between doses computed by the treatment planning system (TPS) and that of the MC for the selected set of voxels on the prescription surface. The technique is applied to 16 clinical cases with a variety of energies, disease sites, and TPS dose calculation algorithms. Results: For all plans except the lung cases with large tissue density inhomogeneity, the independently computed MUs agree with that of TPS to within 2.7% for all the station points. In the dose domain, no significant difference between the MC and Eclipse Anisotropic Analytical Algorithm (AAA) dose distribution is found in terms of isodose contours

  16. Safeguards and Security Independent Oversight Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1998-12-23

    Establishes the DOE Safeguards and Security Independent Oversight Program that provides DOE and contractor managers, Congress, and other stakeholders with an independent evaluation of the effectiveness of DOE safeguards and security policy and programs, and the implementation of those policies and programs. Cancels DOE 5630.12A.

  17. Independent Oversight Review, West Valley Demonstration Project

    Office of Environmental Management (EM)

    Transportation - September 2000 | Department of Energy West Valley Demonstration Project Transportation - September 2000 Independent Oversight Review, West Valley Demonstration Project Transportation - September 2000 September 2000 Transportation Emergency Management Review of the West Valley Demonstration Project (WVDP) and National Transportation Program (NTP)/Transportation Compliance Evaluation/Assistance Program (TCEAP) This report provides the results of an independent review of the

  18. Independent Peer Review Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Peer Review Program Independent Peer Review Program 2014 PERT Charter.pdf (680.02 KB) More Documents & Publications Hydropower Vision Task Force Charter Procurement Evaluation & Re-Engineering Team (PERT) and Establishment of a 5-year Cycle with Corresponding Schedule Policy Guidance Memorandum #36 SES Competitive Staffing Procedures

  19. Independent Oversight Review, Bonneville Power Administration Safety

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Program - March 2014 | Department of Energy Bonneville Power Administration Safety Management Program - March 2014 Independent Oversight Review, Bonneville Power Administration Safety Management Program - March 2014 March 2014 Oversight Review of the Bonneville Power Administration Safety Management Program Bonneville Power Administration management requested that the U.S. Department of Energy Office of Enforcement and Oversight (Independent Oversight), within the Office of

  20. Targeted Technology Transfer to US Independents

    SciTech Connect (OSTI)

    E. Lance Cole

    2009-09-30

    The Petroleum Technology Transfer Council (PTTC) was established by domestic crude oil and natural gas producers, working in conjunction with the Independent Petroleum Association of America (IPAA), the U.S. Department of Energy (DOE) and selected universities, in 1994 as a national not-for-profit organization. Its goal is to transfer Exploration and Production (E&P) technology to the domestic upstream petroleum industry, in particular to the small independent operators. PTTC connects producers, technology providers and innovators, academia, and university/industry/government research and development (R&D) groups. From inception PTTC has received federal funding through DOE's oil and natural gas program managed by the National Energy Technology Laboratory (NETL). With higher funding available in its early years, PTTC was able to deliver well more than 100 workshops per year, drawing 6,000 or more attendees per year. Facing the reality of little or no federal funding in the 2006-2007 time frame, PTTC and the American Association of Petroleum Geologists (AAPG) worked together for PTTC to become a subsidiary organization of AAPG. This change brings additional organizational and financial resources to bear for PTTC's benefit. PTTC has now been 'powered by AAPG' for two full fiscal years. There is a clear sense that PTTC has stabilized and is strengthening its regional workshop and national technology transfer programs and is becoming more entrepreneurial in exploring technology transfer opportunities beyond its primary DOE contract. Quantitative accomplishments: PTTC has maintained its unique structure of a national organization working through Regional Lead Organizations (RLOs) to deliver local, affordable workshops. During the contract period PTTC consolidated from 10 to six regions efficiency and alignment with AAPG sections. The number of workshops delivered by its RLOs during the contract period is shown below. Combined attendance over the period was approximately

  1. Reinforcing of QA/QC programs in radiotherapy departments in Croatia: Results of treatment planning system verification

    SciTech Connect (OSTI)

    Jurkovi?, Slaven; vabi?, Manda; Dikli?, Ana; Smilovi? Radoj?i?, ?eni; Dundara, Dea; Kasabai?, Mladen; Ivkovi?, Ana; Faj, Dario

    2013-04-01

    Implementation of advanced techniques in clinical practice can greatly improve the outcome of radiation therapy, but it also makes the process much more complex with a lot of room for errors. An important part of the quality assurance program is verification of treatment planning system (TPS). Dosimetric verifications in anthropomorphic phantom were performed in 4 centers where new systems were installed. A total of 14 tests for 2 photon energies and multigrid superposition algorithms were conducted using the CMS XiO TPS. Evaluation criteria as specified in the International Atomic Energy Agency Technical Reports Series (IAEA TRS) 430 were employed. Results of measurements are grouped according to the placement of the measuring point and the beam energy. The majority of differences between calculated and measured doses in the water-equivalent part of the phantom were in tolerance. Significantly more out-of-tolerance values were observed in nonwater-equivalent parts of the phantom, especially for higher-energy photon beams. This survey was done as a part of continuous effort to build up awareness of quality assurance/quality control (QA/QC) importance in the Croatian radiotherapy community. Understanding the limitations of different parts of the various systems used in radiation therapy can systematically improve quality as well.

  2. Measurement and Verification Options for Federal Energy- and Water-Saving

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Projects | Department of Energy Options for Federal Energy- and Water-Saving Projects Measurement and Verification Options for Federal Energy- and Water-Saving Projects Federal Energy Management Program measurement and verification (M&V) guidelines and International Performance Measurement and Verification Protocol M&V methodologies are broken into four options. These options offer generic M&V approaches for energy- and water-saving projects. Option A: Retrofit Isolation

  3. Indoor airPLUS Version 1 (Rev. 01) Verification Checklist | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Version 1 (Rev. 01) Verification Checklist Indoor airPLUS Version 1 (Rev. 01) Verification Checklist The Rev. 01 checklist has been modified to reflect only the additional Indoor airPLUS requirements and their corresponding section numbers that must be met after completing the ENERGY STAR checklists. iap_verification_checklist_rev_1.pdf (261.75 KB) More Documents & Publications Indoor airPLUS Construction Specifications Indoor airPLUS Construction Specifications Version 1 (Rev.

  4. Targeted Technology Transfer to US Independents

    SciTech Connect (OSTI)

    Schatzinger, Viola; Chapman, Kathy; Lovendahl, Kristi

    2014-09-30

    The Petroleum Technology Transfer Council (PTTC) is a unique not-for-profit network that focuses on transferring Exploration and Production (E&P) technology to the domestic oil and natural gas producing industry. PTTC connects producers, technology providers and innovators, academia, research and development (R&D) consortiums and governments. Local affordable workshops delivered by Regional Lead Organizations (RLOs), which are typically a university or geological survey, are a primary tool. PTTC also maintains a website network, issues a national newsletter, provides a column in a major trade publication, and exhibits at major industry events. It also encourages industry to ask technology-related questions, striving to find relevant answers that will save questioners significant time. Working since late 1993, the PTTC network has a proven track record of providing industry with technology insights they can apply. Volunteers at the regional and national level provide key guidance regarding where to focus technical effort and help connect PTTC with industry. At historical funding levels, PTTC had been able to hold well more than 100 workshops per year, drawing 6,000+ attendees. As funding decreased in the early 2000s, the level of activity decreased and PTTC sought a merger with the American Association of Petroleum Geologists (AAPG), becoming an AAPG-managed organization at the start of FY08. This relationship with AAPG was terminated by mutual consent in May 2011 and PTTC once again operates independently. Chris Hall, California continued to serve as Chairman of the Board of Directors until December 2013. At the time PTTC reorganized into a RLO led organization with Mary Carr and Jeremy Viscomi as co-Executive Directors. Jerry Anderson became the Chairman of the PTTC Board of Directors and Chris Hall continues to serve on the Board. Workshop activity stabilized at 55-65 workshops per year averaging 3,100 attendees. FY14 represented the fifth year in a multi

  5. Energy Independence and Security Act of 2007 | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independence and Security Act of 2007 Energy Independence and Security Act of 2007 Section 136 of the Energy Independence and Security Act of 2007 establishes an incentive program ...

  6. State and Local Energy Savings Performance Contracting: Savings Measurement and Verification

    Broader source: Energy.gov [DOE]

    This webinar, held on Feb. 24, 2011, covers background and benefits of measurement and verification and highlights activities for state and local energy savings performance contracting.

  7. PDET-A New Tool for Partial Defect Verification of Pressurized...

    Office of Scientific and Technical Information (OSTI)

    PDET-A New Tool for Partial Defect Verification of Pressurized Water Reactor Spent Fuel ... Visit OSTI to utilize additional information resources in energy science and technology. A ...

  8. 2003 Idaho National Engineering and Environmental Laboratory Shallow Injection Well Verification and Status Report

    SciTech Connect (OSTI)

    Lewis, M.G.

    2003-08-21

    A detailed verification of the shallow injection well inventory for Bechtel BWXT Idaho, LLC and Argonne National Laboratory-West-operated facilities was performed in 2003. Fourteen wells, or 20%, were randomly selected for the verification. This report provides updated information on the 14 shallow injection wells that were randomly selected for the 2003 verification. Where applicable, additional information is provided for shallow injection wells that were not selected for the 2003 verification. This updated information was incorporated into the 2003 Shallow Injection Wells Inventory, Sixty-eight wells were removed from the 2003 Shallow Injection Well Inventory.

  9. 2003 Idaho National Engineering and Environmental Laboratory Shallow Injection Well Verification and Status Report

    SciTech Connect (OSTI)

    Mike Lewis

    2003-08-01

    A detailed verification of the shallow injection well inventory for Bechtel BWXT Idaho, LLC and Argonne National Laboratory-West-operated facilities was performed in 2003. Fourteen wells, or 20%, were randomly selected for the verification. This report provides updated information on the 14 shallow injection wells that were randomly selected for the 2003 verification. Where applicable, additional information is provided for shallow injection wells that were not selected for the 2003 verification. This updated information was incorporated into the 2003 Shallow Injection Wells Inventory. Sixty-eight wells were removed from the 2003 Shallow Injection Well Inventory.

  10. High Impact Technology Hub- Resources for Evaluators- General Measurement and Verification Plans

    Broader source: Energy.gov [DOE]

    The HIT Catalyst conducts technology demonstrations in three main phases govern demonstrations: Site Evaluation, Selection and Project Kick-Off, Measurement and Verification Scoping and Plan...

  11. PDET-A New Tool for Partial Defect Verification of Pressurized...

    Office of Scientific and Technical Information (OSTI)

    of Pressurized Water Reactor Spent Fuel Assemblies Citation Details In-Document Search Title: PDET-A New Tool for Partial Defect Verification of Pressurized Water Reactor Spent ...

  12. M&V Guidelines: Measurement and Verification for Federal Energy Projects (Version 4.0)

    Broader source: Energy.gov [DOE]

    Document outlines the Federal Energy Management Program's standard procedures and guidelines for measurement and verification (M&V) for federal energy managers, procurement officials, and energy service providers.

  13. Code verification for the eXtended Finite Element Method (XFEM...

    Office of Scientific and Technical Information (OSTI)

    Title: Code verification for the eXtended Finite Element Method (XFEM): the compound cohesionless impact problem. Abstract not provided. Authors: Niederhaus, John Henry ; Voth, ...

  14. M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 4.0

    SciTech Connect (OSTI)

    2015-11-02

    Document outlines the Federal Energy Management Program's standard procedures and guidelines for measurement and verification (M&V) for federal energy managers, procurement officials, and energy service providers.

  15. Round-Robin Verification and Final Development of the IEC 62788...

    Office of Scientific and Technical Information (OSTI)

    Verification and Final Development of the IEC 62788-1-5 Encapsulation Size Change Test; NREL (National Renewable Energy Laboratory) Citation Details In-Document Search Title:...

  16. LLCEDATA and LLCECALC for Windows version 1.0, Volume 3: Software verification and validation

    SciTech Connect (OSTI)

    McFadden, J.G.

    1998-09-04

    LLCEDATA and LLCECALC for Windows are user-friendly computer software programs that work together to determine the proper waste designation, handling, and disposition requirements for Long Length Contaminated Equipment (LLCE). LLCEDATA reads from a variety of data bases to produce an equipment data file(EDF) that represents a snapshot of both the LLCE and the tank from which it originates. LLCECALC reads the EDF and the gamma assay file (AV2) that is produced by the flexible Receiver Gamma Energy Analysis System. LLCECALC performs corrections to the AV2 file as it is being read and characterizes the LLCE. Both programs produce a variety of reports, including a characterization report and a status report. The status report documents each action taken by the user, LLCEDATA, and LLCECALC. Documentation for LLCEDATA and LLCECALC for Windows is available in three volumes. Volume 1 is a user`s manual, which is intended as a quick reference for both LLCEDATA and LLCECALC. Volume 2 is a technical manual, which discusses system limitations and provides recommendations to the LLCE process. Volume 3 documents LLCEDATA and LLCECALC`s verification and validation. Two of the three installation test cases, from Volume 1, are independently confirmed. Data bases used in LLCEDATA are verified and referenced. Both phases of LLCECALC process gamma and characterization, are extensively tested to verify that the methodology and algorithms used are correct.

  17. Verification of theoretically computed spectra for a point rotating in a vertical plane

    SciTech Connect (OSTI)

    Powell, D.C.; Connell, J.R.; George, R.L.

    1985-03-01

    A theoretical model is modified and tested that produces the power spectrum of the alongwind component of turbulence as experienced by a point rotating in a vertical plane perpendicular to the mean wind direction. The ability to generate such a power spectrum, independent of measurement, is important in wind turbine design and testing. The radius of the circle of rotation, its height above the ground, and the rate of rotation are typical for those for a MOD-OA wind turbine. Verification of this model is attempted by comparing two sets of variances that correspond to individual harmonic bands of spectra of turbulence in the rotational frame. One set of variances is calculated by integrating the theoretically generated rotational spectra; the other is calculated by integrating rotational spectra from real data analysis. The theoretical spectrum is generated by Fourier transformation of an autocorrelation function taken from von Karman and modified for the rotational frame. The autocorrelation is based on dimensionless parameters, each of which incorporates both atmospheric and wind turbine parameters. The real data time series are formed by sampling around the circle of anemometers of the Vertical Plane Array at the former MOD-OA site at Clayton, New Mexico.

  18. Development of Monitoring & Verification Technology (MVT) for Carbon Sequestration in Terrestrial Ecosystems: Instrumentation and Protocols

    SciTech Connect (OSTI)

    Wielopolski, Lucian

    2008-09-29

    The objective of this CRADA is to further develop the Multiple Elemental Soil Analysis (MESA) system, based on inelastic neutron scattering technology that was originally developed by Dr. Lucian Wielopolski at BNL. The scope of this CRADA will center on the quantification and monitoring of non-destructive in situ carbon loading in soils to evaluate land application emission reduction activities. To accomplish this objective, the CRADA will center on three main joint activities as described below: A. To further develop and characterize a prototype, field deployable MESA system for static and scanning purposes. B. To develop applicable protocols for agricultural land applications; system validation and field sampling schemes. C. To implement field experiments for independent systems validation, verification, and acceptance by third parties for use in the market segment and commercialization. The technical approach involves a system for monitoring characteristic gamma rays emitted from carbon nuclei stimulated by inelastic neutron scattering from a carbon nucleus. The system consists of a neutron generator emitting fast, 14 MeV, neutrons, shielding materials, and a detection system with nuclear electronics for data acquisition. Following standard system calibration, the results are produced immediately at the end of the counting period.

  19. Development of a portal monitor for UF6 cylinder verification

    SciTech Connect (OSTI)

    Smith, Leon E.; Curtis, Michael M.; Shaver, Mark W.; Benz, Jacob M.; Misner, Alex C.; Mace, Emily K.; Jordan, David V.; Noss, Daniel; Ford, Herbert

    2009-10-06

    International Atomic Energy Agency (IAEA) inspectors currently perform periodic inspections at uranium enrichment plants to verify UF6 cylinder enrichment declarations. Measurements are performed with handheld high-resolution sensors on a sampling of cylinders taken to be representative of the facility’s operations. As additional enrichment plans come online to support the expansion of nuclear power, reducing person-days of inspection will take on greater importance. Pacific Northwest National Laboratory (PNNL) is developing a concept to automate the verification of enrichment plant cylinders to enable 100% product-cylinder verification and potentially, mass-balance calculations on the facility as a whole (by also measuring feed and tails cylinders). The Automated Cylinder Enrichment Verification System (ACEVS) would be located at key measurement points and will positively identify each cylinder, measure its mass and enrichment, store the data along with operator inputs in a secure database, and maintain continuity of knowledge on measured cylinders until IAEA inspector arrival. Given the potential for reduced inspector presence, the operational and manpower-reduction benefits of the portal concept are clear. However, it is necessary to assess whether the cylinder portal concept can meet, or potentially improve upon, today’s U-235 enrichment assay performance. PNNL’s ACEVS concept utilizes sensors that could be operated in an unattended mode: moderated He-3 neutron detectors and large NaI(Tl) scintillators for gamma-ray spectroscopy. The medium-resolution NaI(Tl) scintillators are a sacrifice in energy resolution but do provide high collection efficiency for signatures above 1 MeV. The He-3/NaI sensor combination allows the exploitation of additional, more-penetrating signatures than those currently utilized: Neutrons produced from F-19(μ,n) reactions (spawned primarily from U-234 alpha emission) and high-energy gamma rays (extending up to 10 MeV) induced by

  20. MO-G-BRE-04: Automatic Verification of Daily Treatment Deliveries and Generation of Daily Treatment Reports for a MR Image-Guided Treatment Machine

    SciTech Connect (OSTI)

    Yang, D; Li, X; Li, H; Wooten, H; Green, O; Rodriguez, V; Mutic, S

    2014-06-15

    Purpose: Two aims of this work were to develop a method to automatically verify treatment delivery accuracy immediately after patient treatment and to develop a comprehensive daily treatment report to provide all required information for daily MR-IGRT review. Methods: After systematically analyzing the requirements for treatment delivery verification and understanding the available information from a novel MR-IGRT treatment machine, we designed a method to use 1) treatment plan files, 2) delivery log files, and 3) dosimetric calibration information to verify the accuracy and completeness of daily treatment deliveries. The method verifies the correctness of delivered treatment plans and beams, beam segments, and for each segment, the beam-on time and MLC leaf positions. Composite primary fluence maps are calculated from the MLC leaf positions and the beam-on time. Error statistics are calculated on the fluence difference maps between the plan and the delivery. We also designed the daily treatment delivery report by including all required information for MR-IGRT and physics weekly review - the plan and treatment fraction information, dose verification information, daily patient setup screen captures, and the treatment delivery verification results. Results: The parameters in the log files (e.g. MLC positions) were independently verified and deemed accurate and trustable. A computer program was developed to implement the automatic delivery verification and daily report generation. The program was tested and clinically commissioned with sufficient IMRT and 3D treatment delivery data. The final version has been integrated into a commercial MR-IGRT treatment delivery system. Conclusion: A method was developed to automatically verify MR-IGRT treatment deliveries and generate daily treatment reports. Already in clinical use since December 2013, the system is able to facilitate delivery error detection, and expedite physician daily IGRT review and physicist weekly chart

  1. Galaxy Clustering, Photometric Redshifts and Diagnosis of Systematics in the DES Science Verification Data

    SciTech Connect (OSTI)

    Crocce, M.

    2015-12-09

    We study the clustering of galaxies detected at i < 22.5 in the Science Verification observations of the Dark Energy Survey (DES). Two-point correlation functions are measured using 2.3 × 106 galaxies over a contiguous 116 deg2 region in five bins of photometric redshift width Δz = 0.2 in the range 0.2 < z < 1.2. The impact of photometric redshift errors is assessed by comparing results using a template-based photo-zalgorithm (BPZ) to a machine-learning algorithm (TPZ). A companion paper presents maps of several observational variables (e.g. seeing, sky brightness) which could modulate the galaxy density. Here we characterize and mitigate systematic errors on the measured clustering which arise from these observational variables, in addition to others such as Galactic dust and stellar contamination. After correcting for systematic effects, we then measure galaxy bias over a broad range of linear scales relative to mass clustering predicted from the Planck Λ cold dark matter model, finding agreement with the Canada-France-Hawaii Telescope Legacy Survey (CFHTLS) measurements with χ2 of 4.0 (8.7) with 5 degrees of freedom for the TPZ (BPZ) redshifts. Furthermore, we test a ‘linear bias’ model, in which the galaxy clustering is a fixed multiple of the predicted non-linear dark matter clustering. The precision of the data allows us to determine that the linear bias model describes the observed galaxy clustering to 2.5 percent accuracy down to scales at least 4–10 times smaller than those on which linear theory is expected to be sufficient.

  2. Galaxy Clustering, Photometric Redshifts and Diagnosis of Systematics in the DES Science Verification Data

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Crocce, M.

    2015-12-09

    We study the clustering of galaxies detected at i < 22.5 in the Science Verification observations of the Dark Energy Survey (DES). Two-point correlation functions are measured using 2.3 × 106 galaxies over a contiguous 116 deg2 region in five bins of photometric redshift width Δz = 0.2 in the range 0.2 < z < 1.2. The impact of photometric redshift errors is assessed by comparing results using a template-based photo-zalgorithm (BPZ) to a machine-learning algorithm (TPZ). A companion paper presents maps of several observational variables (e.g. seeing, sky brightness) which could modulate the galaxy density. Here we characterize andmore » mitigate systematic errors on the measured clustering which arise from these observational variables, in addition to others such as Galactic dust and stellar contamination. After correcting for systematic effects, we then measure galaxy bias over a broad range of linear scales relative to mass clustering predicted from the Planck Λ cold dark matter model, finding agreement with the Canada-France-Hawaii Telescope Legacy Survey (CFHTLS) measurements with χ2 of 4.0 (8.7) with 5 degrees of freedom for the TPZ (BPZ) redshifts. Furthermore, we test a ‘linear bias’ model, in which the galaxy clustering is a fixed multiple of the predicted non-linear dark matter clustering. The precision of the data allows us to determine that the linear bias model describes the observed galaxy clustering to 2.5 percent accuracy down to scales at least 4–10 times smaller than those on which linear theory is expected to be sufficient.« less

  3. Radiography Facility - Building 239 Independent Validation Review...

    Office of Scientific and Technical Information (OSTI)

    The purpose of this task was to perform an Independent Validation Review to evaluate the ... The review follows the outline developed for Milestone 1 of the PEP, which is based on the ...

  4. Independence Power Marketing | Open Energy Information

    Open Energy Info (EERE)

    Power Marketing Jump to: navigation, search Name: Independence Power Marketing Place: New York References: EIA Form EIA-861 Final Data File for 2010 - File1a1 EIA Form 861 Data...

  5. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Environmental Management (EM)

    in Technical Area-55 that were conducted July 18 through August 19, 2011. The independent review was performed by the U.S. Department of Energy's (DOE) Office of Safety and ...

  6. ICDF Complex Waste Profile and Verification Sample Guidance

    SciTech Connect (OSTI)

    W. M. Heileson

    2006-10-01

    This guidance document will assist waste generators who characterize waste streams destined for disposal at the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility (ICDF) Complex. The purpose of this document is to develop a conservative but appropriate way to (1) characterize waste for entry into the ICDF; (2) ensure compliance with the waste acceptance criteria; and (3) facilitate disposal at the ICDF landfill or evaporation pond. In addition, this document will establish the waste verification process used by ICDF personnel to ensure that untreated waste meets applicable ICDF acceptance limits

  7. Microsoft Word - S0191800 - Gunnison Verification Monitoring Report 0906.doc

    Office of Legacy Management (LM)

    6 Office of Legacy Management DOE M/1305-2006 -L Work Performed Under DOE Contract No. for the U.S. Department of Energy Office of Legacy Management. DE-AC01-02GJ79491 Approved for public release; distribution is unlimited. Office of Legacy Management Office of Legacy Management Office of Legacy Management U.S. Department of Energy S0191800 DOE-LM/1305-2006 Office of Legacy Management Verification Monitoring Report for the Gunnison, Colorado, Processing Site September 2006 Work Performed by S.M.

  8. Microsoft Word - beam characterization and verification.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Beam Characterization and Verification Detector Components and Arrangement The beam uniformity and flux are determined using an array of five particle detectors. Each detector consists of Bicron BC-400 scintillator, a Bicron BC-634A optical coupling pad, a Hamamatsu R1635 photomultiplier tube, and a Hamamatsu E1761-04 tube base. Four of the detectors are fixed in position as show in Figure 1 and set up to measure beam particle counting rates continuously at four characteristic points, each 1.64

  9. Superior Energy Performance Measurement and Verification Protocol for Industry

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Superior Energy Performance Measurement and Verification Protocol for Industry November 19, 2012 Table of Contents ©2012, The Regents of the University of California Notice: this manuscript has been authored by employees of the Regents of the University of California, and others, under Contract No DE-AC02-05CH11231 with the U.S. Department of Energy, for the management and operation of the Lawrence Berkeley National Laboratory. The United State Government retains a non-exclusive, paid-up,

  10. Cleanup Verification Package for the 116-K-2 Effluent Trench

    SciTech Connect (OSTI)

    J. M. Capron

    2006-04-04

    This cleanup verification package documents completion of remedial action for the 116-K-2 effluent trench, also referred to as the 116-K-2 mile-long trench and the 116-K-2 site. During its period of operation, the 116-K-2 site was used to dispose of cooling water effluent from the 105-KE and 105-KW Reactors by percolation into the soil. This site also received mixed liquid wastes from the 105-KW and 105-KE fuel storage basins, reactor floor drains, and miscellaneous decontamination activities.

  11. Verification of RESRAD-RDD. (Version 2.01)

    SciTech Connect (OSTI)

    Cheng, Jing-Jy; Flood, Paul E.; LePoire, David; Kamboj, Sunita; Yu, Charley

    2015-09-01

    In this report, the results generated by RESRAD-RDD version 2.01 are compared with those produced by RESRAD-RDD version 1.7 for different scenarios with different sets of input parameters. RESRAD-RDD version 1.7 is spreadsheet-driven, performing calculations with Microsoft Excel spreadsheets. RESRAD-RDD version 2.01 revamped version 1.7 by using command-driven programs designed with Visual Basic.NET to direct calculations with data saved in Microsoft Access database, and re-facing the graphical user interface (GUI) to provide more flexibility and choices in guideline derivation. Because version 1.7 and version 2.01 perform the same calculations, the comparison of their results serves as verification of both versions. The verification covered calculation results for 11 radionuclides included in both versions: Am-241, Cf-252, Cm-244, Co-60, Cs-137, Ir-192, Po-210, Pu-238, Pu-239, Ra-226, and Sr-90. At first, all nuclidespecific data used in both versions were compared to ensure that they are identical. Then generic operational guidelines and measurement-based radiation doses or stay times associated with a specific operational guideline group were calculated with both versions using different sets of input parameters, and the results obtained with the same set of input parameters were compared. A total of 12 sets of input parameters were used for the verification, and the comparison was performed for each operational guideline group, from A to G, sequentially. The verification shows that RESRAD-RDD version 1.7 and RESRAD-RDD version 2.01 generate almost identical results; the slight differences could be attributed to differences in numerical precision with Microsoft Excel and Visual Basic.NET. RESRAD-RDD version 2.01 allows the selection of different units for use in reporting calculation results. The results of SI units were obtained and compared with the base results (in traditional units) used for comparison with version 1.7. The comparison shows that RESRAD

  12. Digital data storage systems, computers, and data verification methods

    DOE Patents [OSTI]

    Groeneveld, Bennett J.; Austad, Wayne E.; Walsh, Stuart C.; Herring, Catherine A.

    2005-12-27

    Digital data storage systems, computers, and data verification methods are provided. According to a first aspect of the invention, a computer includes an interface adapted to couple with a dynamic database; and processing circuitry configured to provide a first hash from digital data stored within a portion of the dynamic database at an initial moment in time, to provide a second hash from digital data stored within the portion of the dynamic database at a subsequent moment in time, and to compare the first hash and the second hash.

  13. Independent Oversight Evaluation, Office of Secure Transportation -

    Office of Environmental Management (EM)

    February 2004 | Department of Energy Evaluation, Office of Secure Transportation - February 2004 Independent Oversight Evaluation, Office of Secure Transportation - February 2004 February 2004 Evaluation of the Office of Secure Transportation Emergency Management Program This report provides the results of an independent oversight evaluation of the emergency management program at the Department of Energy's (DOE) Office of Secure Transportation. The evaluation was performed in October 2003 by

  14. Independent Oversight Inspection, Stanford Linear Accelerator Center -

    Office of Environmental Management (EM)

    Energy Plant - June 2009 Independent Oversight Inspection, Pantex Plant - June 2009 June 2009 Inspection of Environment, Safety, and Health Programs at the Pantex Plant This report documents the results of an inspection of the environment, safety, and health programs at the Department of Energy's (DOE) Pantex Plant. The inspection was performed during March and April 2009 by the DOE Office of Independent Oversight's Office of Environment, Safety and Health Evaluations, which is within the

  15. Independent Oversight Review, National Nuclear Security Administration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Production Office - February 2014 | Department of Energy National Nuclear Security Administration Production Office - February 2014 Independent Oversight Review, National Nuclear Security Administration Production Office - February 2014 February 2014 Review of the National Nuclear Security Administration Production Office Readiness Review Program The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security,

  16. Independent Oversight Targeted Review, Sandia National Laboratories -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 2014 | Department of Energy April 2014 Independent Oversight Targeted Review, Sandia National Laboratories - April 2014 April 2014 Targeted Review of the Sandia National Laboratories Federal Assurance Capability The U.S. Department of Energy (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), conducted an independent review of the performance of the DOE Sandia Field Office safety oversight of the Sandia Corporation. The review was

  17. The Economics of Energy Independence for Iran

    SciTech Connect (OSTI)

    Wood, Thomas W.; Milazzo, Matthew D.; Reichmuth, Barbara A.; Bedell, Jeffrey J.

    2007-03-01

    Iran has pursued an ambitious nuclear program with the declared goal of long-term energy independence. While this is a worthwhile and generally accepted national planning objective, it is clear that the nuclear program as now structured will not achieve it, and in fact may delay it by diverting capital and other resources from projects that would address pressing current energy sector problems and contribute to ultimate energy independence.

  18. NEPA Litigation Surveys

    Broader source: Energy.gov [DOE]

    CEQ publishes surveys on NEPA litigation on an annual basis. These surveys identify the number of cases involving a NEPA based cause of action, Federal agencies that were identified as a lead...

  19. 2002 Manufacturing Energy Consumption Survey - User Needs Survey

    U.S. Energy Information Administration (EIA) Indexed Site

    2002 Manufacturing Energy Consumption Survey: User-Needs Survey View current results. We need your help in designing the next Energy Consumption Survey (MECS) As our valued...

  20. Review of the Pantex Plant Implementation Verification Review...

    Energy Savers [EERE]

    for Improvement PXSO Pantex Site Office SAC Specific Administrative Control SSC Structures, Systems, and Components TSR Technical Safety Requirement 1 Independent Oversight...

  1. Verification of Geothermal Tracer Methods in Highly Constrained...

    Open Energy Info (EERE)

    the problem can be fully constrained. In a shallow horizontal sandstone fracture surface ground penetrating radar (GPR) is used to map the flow paths in the fracture independently...

  2. This letter is to inform AHAM that DOE is adopting a new policy regarding DOE ENERGY STAR verification testing of models that are part of the AHAM verification program.

    Broader source: Energy.gov [DOE]

    This letter is to inform AHAM that DOE is adopting a new policy regarding DOE ENERGY STAR verification testing of models that are part of the AHAM verification program.

  3. The Integrated Safety Management System Verification Enhancement Review of the Plutonium Finishing Plant (PFP)

    SciTech Connect (OSTI)

    BRIGGS, C.R.

    2000-02-09

    The primary purpose of the verification enhancement review was for the DOE Richland Operations Office (RL) to verify contractor readiness for the independent DOE Integrated Safety Management System Verification (ISMSV) on the Plutonium Finishing Plant (PFP). Secondary objectives included: (1) to reinforce the engagement of management and to gauge management commitment and accountability; (2) to evaluate the ''value added'' benefit of direct public involvement; (3) to evaluate the ''value added'' benefit of direct worker involvement; (4) to evaluate the ''value added'' benefit of the panel-to-panel review approach; and, (5) to evaluate the utility of the review's methodology/adaptability to periodic assessments of ISM status. The review was conducted on December 6-8, 1999, and involved the conduct of two-hour interviews with five separate panels of individuals with various management and operations responsibilities related to PFP. A semi-structured interview process was employed by a team of five ''reviewers'' who directed open-ended questions to the panels which focused on: (1) evidence of management commitment, accountability, and involvement; and, (2) consideration and demonstration of stakeholder (including worker) information and involvement opportunities. The purpose of a panel-to-panel dialogue approach was to better spotlight: (1) areas of mutual reinforcement and alignment that could serve as good examples of the management commitment and accountability aspects of ISMS implementation, and, (2) areas of potential discrepancy that could provide opportunities for improvement. In summary, the Review Team found major strengths to include: (1) the use of multi-disciplinary project work teams to plan and do work; (2) the availability and broad usage of multiple tools to help with planning and integrating work; (3) senior management presence and accessibility; (4) the institutionalization of worker involvement; (5) encouragement of self-reporting and self

  4. Safeguards Verification Measurements using Laser Ablation, Absorbance Ratio Spectrometry in Gaseous Centrifuge Enrichment Plants

    SciTech Connect (OSTI)

    Anheier, Norman C.; Cannon, Bret D.; Qiao, Hong; Phillips, Jon R.

    2012-07-01

    Laser Ablation Absorbance Ratio Spectrometry (LAARS) is a new verification measurement technology under development at the US Department of Energy’s (DOE) Pacific Northwest National Laboratory (PNNL). LAARS uses three lasers to ablate and then measure the relative isotopic abundance of uranium compounds. An ablation laser is tightly focused on uranium-bearing solids producing a small plume containing uranium atoms. Two collinear wavelength-tuned spectrometry lasers transit through the plume and the absorbance of U-235 and U-238 isotopes are measured to determine U-235 enrichment. The measurement has high relative precision and detection limits approaching the femtogram range for uranium. It is independent of chemical form and degree of dilution with nuisance dust and other materials. High speed sample scanning and pinpoint characterization allow measurements on millions of particles/hour to detect and analyze the enrichment of trace uranium in samples. The spectrometer is assembled using commercially available components at comparatively low cost, and features a compact and low power design. Future designs can be engineered for reliable, autonomous deployment within an industrial plant environment. Two specific applications of the spectrometer are under development: 1) automated unattended aerosol sampling and analysis and 2) on-site small sample destructive assay measurement. The two applications propose game-changing technological advances in gaseous centrifuge enrichment plant (GCEP) safeguards verification. The aerosol measurement instrument, LAARS-environmental sampling (ES), collects aerosol particles from the plant environment in a purpose-built rotating drum impactor and then uses LAARS-ES to quickly scan the surface of the impactor to measure the enrichments of the captured particles. The current approach to plant misuse detection involves swipe sampling and offsite analysis. Though this approach is very robust it generally requires several months to

  5. Measurement and Verification Activities Required in the Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    service company (ESCO) defines the baselines as part of the investment-grade audit (IGA). ... strategies) are characterized through IGA surveys, inspections, spot measurements, ...

  6. Neutron spectrometry for UF6 enrichment verification in storage cylinders

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Mengesha, Wondwosen; Kiff, Scott D.

    2015-01-29

    Verification of declared UF6 enrichment and mass in storage cylinders is of great interest in nuclear material nonproliferation. Nondestructive assay (NDA) techniques are commonly used for safeguards inspections to ensure accountancy of declared nuclear materials. Common NDA techniques used include gamma-ray spectrometry and both passive and active neutron measurements. In the present study, neutron spectrometry was investigated for verification of UF6 enrichment in 30B storage cylinders based on an unattended and passive measurement approach. MCNP5 and Geant4 simulated neutron spectra, for selected UF6 enrichments and filling profiles, were used in the investigation. The simulated neutron spectra were analyzed using principalmore » component analysis (PCA). The PCA technique is a well-established technique and has a wide area of application including feature analysis, outlier detection, and gamma-ray spectral analysis. Results obtained demonstrate that neutron spectrometry supported by spectral feature analysis has potential for assaying UF6 enrichment in storage cylinders. The results from the present study also showed that difficulties associated with the UF6 filling profile and observed in other unattended passive neutron measurements can possibly be overcome using the approach presented.« less

  7. Comments for A Conference on Verification in the 21st Century

    SciTech Connect (OSTI)

    Doyle, James E.

    2012-06-12

    The author offers 5 points for the discussion of Verification and Technology: (1) Experience with the implementation of arms limitation and arms reduction agreements confirms that technology alone has never been relied upon to provide effective verification. (2) The historical practice of verification of arms control treaties between Cold War rivals may constrain the cooperative and innovative use of technology for transparency, veification and confidence building in the future. (3) An area that has been identified by many, including the US State Department and NNSA as being rich for exploration for potential uses of technology for transparency and verification is information and communications technology (ICT). This includes social media, crowd-sourcing, the internet of things, and the concept of societal verification, but there are issues. (4) On the issue of the extent to which verification technologies are keeping pace with the demands of future protocols and agrements I think the more direct question is ''are they effective in supporting the objectives of the treaty or agreement?'' In this regard it is important to acknowledge that there is a verification grand challenge at our doorstep. That is ''how does one verify limitations on nuclear warheads in national stockpiles?'' (5) Finally, while recognizing the daunting political and security challenges of such an approach, multilateral engagement and cooperation at the conceptual and technical levels provides benefits for addressing future verification challenges.

  8. Validation and verification plan for safety and PRA codes. Revision 1

    SciTech Connect (OSTI)

    Ades, M.J.; Crowe, R.D.; Toffer, H.

    1991-04-01

    This report discusses a verification and validation (V&V) plan for computer codes used for safety analysis and probabilistic risk assessment calculations. The present plan fulfills the commitments by Westinghouse Savannah River Company (WSRC) to the Department of Energy Savannah River Office (DOE-SRO) to bring the essential safety analysis and probabilistic risk assessment codes in compliance with verification and validation requirements.

  9. Microsoft Word - S05773_2009 VerifMonRpt.doc

    Office of Legacy Management (LM)

    September 2009 LMS/DUP/S05773 This page intentionally left blank LMS/DUP/S05773 Office of Legacy Management Verification Monitoring Report for the Durango, Colorado, Processing Site September 2009 This page intentionally left blank U.S. Department of Energy Verification Monitoring Report-Durango, Colorado, Processing Site September 2009 Doc. No. S05773 Page i Contents

  10. Lloyd's Register Quality Assurance, Inc. Now Available as Accredited SEP Verification Body

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy is pleased to announce that Lloyd's Register Quality Assurance, Inc. (LRQA) is now a fully accredited Verification Body for Superior Energy Performance® (SEP™). This ANSI-ANAB accreditation enables LRQA to provide third-party verification for industrial facilities that wish to demonstrate energy management excellence and sustained energy savings to earn SEP certification.

  11. Environmental Survey preliminary report

    SciTech Connect (OSTI)

    Not Available

    1988-04-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Sandia National Laboratories conducted August 17 through September 4, 1987. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with Sandia National Laboratories-Albuquerque (SNLA). The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at SNLA, and interviews with site personnel. 85 refs., 49 figs., 48 tabs.

  12. 2014 NERSC User Survey

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    User Survey 2014 NERSC User Survey December 17, 2014 by Francesca Verdier Please take a few minutes to fill out NERSC's annual user survey. Your feedback is important because it allows us to judge the quality of our services, give DOE information on how we are doing, and point us to areas in which we can improve. The survey is on the web at the URL: https://www.nersc.gov/news-publications/publications-reports/user-surveys/2014/ and covers the allocation year 2014. Subscribe via RSS Subscribe

  13. Independent Oversight Review, Oak Ridge Office of Environmental Management- February 2012

    Broader source: Energy.gov [DOE]

    Review of the Implementation Verification Review Processes at the Oak Ridge Office of Environmental Management for Building 3019

  14. Independent Oversight and Performance Assurance Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2002-10-31

    The Independent Oversight Program is designed to enhance the DOE safeguards and security; cyber security; emergency management; and environment, safety, and health programs by providing DOE and contractor managers, Congress, and other stakeholders with an independent evaluation of the adequacy of DOE policy and the effectiveness of line management performance in safeguards and security; cyber security; emergency management; environment, safety, and health; and other critical functions as directed by the Secretary. Cancels DOE O 470.2A and Attachment 2 of DOE O 414.1A. Canceled by DOE O 227.1.

  15. Nuclear Proliferation Using Laser Isotope Separation -- Verification Options

    SciTech Connect (OSTI)

    Erickson, S A

    2001-10-15

    Two levels of nonproliferation verification exist. Signatories of the basic agreements under the Nuclear Non-proliferation Treaty (NPT) agree to open their nuclear sites to inspection by the IAEA. A more detailed and intrusive level was developed following the determination that Iraq had begun a nuclear weapons development program that was not detected by the original level of verification methods. This level, referred to as 93+2 and detailed in model protocol INFCIRC/540, allows the IAEA to do environmental monitoring of non-declared facilities that are suspected of containing proliferation activity, and possibly further inspections, as well as allowing more detailed inspections of declared sites. 56 countries have signed a Strengthened Safeguards Systems Additional Protocol as of 16 July 2001. These additional inspections can be done on the instigation of the IAEA itself, or after requests by other parties to the NPT, based on information that they have collected. Since information able to cause suspicion of proliferation could arrive at any country, it is important that countries have procedures in place that will assist them in making decisions related to these inspections. Furthermore, IAEA inspection resources are limited, and therefore care needs to be taken to make best use of these resources. Most of the nonproliferation verification inspections may be concentrated on establishing that diversion of nuclear materials is not occurring, but some fraction will be related to determining if undeclared sites have nuclear materials production taking place within them. Of these, most suspicions will likely be related to the major existing technologies for uranium enrichment and reprocessing for plutonium extraction, as it would seem most likely that nations attempting proliferation would use tested means of producing nuclear materials. However, as technology continues to advance and new methods of enrichment and reprocessing are developed, inspection

  16. Exploring the Possible Use of Information Barriers for future Biological Weapons Verification Regimes

    SciTech Connect (OSTI)

    Luke, S J

    2011-12-20

    This report describes a path forward for implementing information barriers in a future generic biological arms-control verification regime. Information barriers have become a staple of discussion in the area of arms control verification approaches for nuclear weapons and components. Information barriers when used with a measurement system allow for the determination that an item has sensitive characteristics without releasing any of the sensitive information. Over the last 15 years the United States (with the Russian Federation) has led on the development of information barriers in the area of the verification of nuclear weapons and nuclear components. The work of the US and the Russian Federation has prompted other states (e.g., UK and Norway) to consider the merits of information barriers for possible verification regimes. In the context of a biological weapons control verification regime, the dual-use nature of the biotechnology will require protection of sensitive information while allowing for the verification of treaty commitments. A major question that has arisen is whether - in a biological weapons verification regime - the presence or absence of a weapon pathogen can be determined without revealing any information about possible sensitive or proprietary information contained in the genetic materials being declared under a verification regime. This study indicates that a verification regime could be constructed using a small number of pathogens that spans the range of known biological weapons agents. Since the number of possible pathogens is small it is possible and prudent to treat these pathogens as analogies to attributes in a nuclear verification regime. This study has determined that there may be some information that needs to be protected in a biological weapons control verification regime. To protect this information, the study concludes that the Lawrence Livermore Microbial Detection Array may be a suitable technology for the detection of the

  17. Energy Independence and Security Act of 2007

    SciTech Connect (OSTI)

    2011-12-30

    An Act passed in 2007 to move the United States toward greater energy independence and security, to increase the production of clean renewable fuels, to protect consumers, to increase the efficiency of products, buildings, and vehicles, to promote research on and deploy greenhouse gas capture and storage options, and to improve the energy performance of the Federal Government, and for other purposes.

  18. ON THE VERIFICATION AND VALIDATION OF GEOSPATIAL IMAGE ANALYSIS ALGORITHMS

    SciTech Connect (OSTI)

    Roberts, Randy S.; Trucano, Timothy G.; Pope, Paul A.; Aragon, Cecilia R.; Jiang , Ming; Wei, Thomas; Chilton, Lawrence; Bakel, A. J.

    2010-07-25

    Verification and validation (V&V) of geospatial image analysis algorithms is a difficult task and is becoming increasingly important. While there are many types of image analysis algorithms, we focus on developing V&V methodologies for algorithms designed to provide textual descriptions of geospatial imagery. In this paper, we present a novel methodological basis for V&V that employs a domain-specific ontology, which provides a naming convention for a domain-bounded set of objects and a set of named relationship between these objects. We describe a validation process that proceeds through objectively comparing benchmark imagery, produced using the ontology, with algorithm results. As an example, we describe how the proposed V&V methodology would be applied to algorithms designed to provide textual descriptions of facilities

  19. Scope and verification of a Fissile Material (Cutoff) Treaty

    SciTech Connect (OSTI)

    Hippel, Frank N. von

    2014-05-09

    A Fissile Material Cutoff Treaty (FMCT) would ban the production of fissile material - in practice highly-enriched uranium and separated plutonium - for weapons. It has been supported by strong majorities in the United Nations. After it comes into force, newly produced fissile materials could only be produced under international - most likely International Atomic Energy Agency - monitoring. Many non-weapon states argue that the treaty should also place under safeguards pre-existing stocks of fissile material in civilian use or declared excess for weapons so as to make nuclear-weapons reductions irreversible. This paper discusses the scope of the FMCT, the ability to detect clandestine production and verification challenges in the nuclear-weapons states.

  20. Battery Technology Life Verification Test Manual Revision 1

    SciTech Connect (OSTI)

    Jon P. Christophersen

    2012-12-01

    The purpose of this Technology Life Verification Test (TLVT) Manual is to help guide developers in their effort to successfully commercialize advanced energy storage devices such as battery and ultracapacitor technologies. The experimental design and data analysis discussed herein are focused on automotive applications based on the United States Advanced Battery Consortium (USABC) electric vehicle, hybrid electric vehicle, and plug-in hybrid electric vehicle (EV, HEV, and PHEV, respectively) performance targets. However, the methodology can be equally applied to other applications as well. This manual supersedes the February 2005 version of the TLVT Manual (Reference 1). It includes criteria for statistically-based life test matrix designs as well as requirements for test data analysis and reporting. Calendar life modeling and estimation techniques, including a user’s guide to the corresponding software tool is now provided in the Battery Life Estimator (BLE) Manual (Reference 2).