  1. Independent technical review, handbook

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    Purpose Provide an independent engineering review of the major projects being funded by the Department of Energy, Office of Environmental Restoration and Waste Management. The independent engineering review will address questions of whether the engineering practice is sufficiently developed to a point where a major project can be executed without significant technical problems. The independent review will focus on questions related to: (1) Adequacy of development of the technical base of understanding; (2) Status of development and availability of technology among the various alternatives; (3) Status and availability of the industrial infrastructure to support project design, equipment fabrication, facility construction, and process and program/project operation; (4) Adequacy of the design effort to provide a sound foundation to support execution of project; (5) Ability of the organization to fully integrate the system, and direct, manage, and control the execution of a complex major project.

  2. Independent technical review of the Pinellas Plant

    SciTech Connect (OSTI)

    Not Available

    1994-07-01

    This report documents an Independent Technical Review (ITR) of facilities, organizations, plans, activities and various other elements required to successfully transition the Pinellas Plant from Defense Program (DP) funded operation to either community developed reuse or safe deactivation leading to decontamination and decommissioning (D&D). The review was conducted at the request of the Department of Energy (DOE) Deputy Assistant Secretary for Facility Transition and Management (EM-60) and is a consensus of the nine member ITR Team.

  3. Independent technical review of the Mound Plant

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    This report documents an Independent Technical Review (ITR) of the facilities, organizations, plans, and activities required to transition particular elements of the Mound Plant from Defense Program (DP) funded operation as appropriate either to community developed reuse or safe deactivation leading to decontamination and decommissioning (D&D). The review was conducted at the request of the Dr. Willis Bixby, Deputy Assistant Secretary, U.S. Department of Energy EM-60, Office of Facility Transition and Management and is a consensus of the nine member ITR Team. Information for the review was drawn from documents provided to the ITR Team by the Miamisburg Area Office (MB) of the DOE, EG&G, the City of Miamisburg, and others; and from presentations, discussions, interviews, and facility inspections at the Mound Plant during the weeks of March 14 and March 28, 1994. During the week of April 25, 1994, the ITR Team met at Los Alamos, New Mexico to develop consensus recommendations. A presentation of the core recommendations was made at the Mound Plant on May 5, 1994. This is an independent assessment of information available to, and used by, the Mound Plant personnel. Repetition of the information is not meant to imply discovery by the ITR Team. Team members, however, acting as independent reviewers, frequently assess the information from a perspective that differs significantly from that of the Mound Plant personnel. The report is based on information obtained and conditions observed during the March 1994 review interval. The ITR process and normal site work often initiate rapid, beneficial changes in understanding and organization immediately following the review. These changes frequently alter conditions observed during the review, but the report does not address changes subsequent to the review interval.

  4. Independent Oversight Review, Babcock & Wilcox Technical Services...

    Broader source: Energy.gov (indexed) [DOE]

    July 2012 Review of the Long Lead Procurement Processed Used by Babcock & Wilcox Technical Services Y-12, LLC for the Uranium Processing Facility Project This report provides the ...

  5. Independent Peer Reviews

    SciTech Connect (OSTI)

    2012-03-16

    Independent Assessments: DOE's Systems Integrator convenes independent technical reviews to gauge progress toward meeting specific technical targets and to provide technical information necessary for key decisions.

  6. Independent Technical Review of the X-740 Groundwater Remedy, Portsmouth, Ohio: Technical Evaluation and Recommendations

    SciTech Connect (OSTI)

    Looney, B.; Rhia, B.; Jackson, D.; Eddy-Dilek, C.

    2010-04-30

    Environmental Management (EM-32) to provide an independent technical panel to review previous and ongoing remedial activities designed to address TCE contamination in groundwater at X-740. In 1999, a corrective action was implemented at X-740 to address contamination in the groundwater. The DOE planted poplar trees over 2.6 acres of the groundwater plume. After several years of groundwater monitoring, the results indicated that the benefits of phytoremediation were limited and insufficient to meet remedial objectives. In 2007, an alternative remedial strategy based on in situ oxidative treatment was negotiated with Ohio EPA. During FY2008, three treatment phases of chemical oxidation were completed. The general charter for the independent technical review team is to review the results of s previous and ongoing remedial actions to determine whether the current strategy will be effective in meeting the end points specified in the regulatory work plan.

  7. INDEPENDENT REVIEW OF THE X-701B GROUNDWATER REMEDY, PORTSMOUTH, OHIO: TECHNICAL EVALUATION AND RECOMMENDATIONS

    SciTech Connect (OSTI)

    Looney, B.; Eddy-Dilek, C.; Costanza, J.; Rossabi, J.; Early, T.; Skubal, K.; Magnuson, C.

    2008-12-15

    The Department of Energy Portsmouth Paducah Project Office requested assistance from Department of Energy Office of Environmental Management (EM-22) to provide independent technical experts to evaluate past and ongoing remedial activities at the Portsmouth facility that were completed to address TCE contamination associated with the X-701B groundwater plume and to make recommendations for future efforts. The Independent Technical Review team was provided with a detailed and specific charter. The charter requested that the technical team first review the past and current activities completed for the X-701B groundwater remedy for trichloroethene (TCE) in accordance with a Decision Document that was issued by Ohio EPA on December 8, 2003 and a Work Plan that was approved by Ohio EPA on September 22, 2006. The remedy for X-701B divides the activities into four phases: Phase I - Initial Source Area Treatment, Phase II - Expanded Source Area Treatment, Phase III - Evaluation and Reporting, and Phase IV - Downgradient Remediation and Confirmation of Source Area Treatment. Phase I of the remedy was completed during FY2006, and DOE has now completed six oxidant injection events within Phase II. The Independent Technical Review team was asked to evaluate Phase II activities, including soil and groundwater results, and to determine whether or not the criteria that were defined in the Work Plan for the Phase II end point had been met. The following criteria are defined in the Work Plan as an acceptable Phase II end point: (1) Groundwater samples from the identified source area monitoring wells have concentrations below the Preliminary Remediation Goal (PRG) for TCE in groundwater, or (2) The remedy is no longer effective in removing TCE mass from the source area. In addition, the charter specifies that if the Review Team determines that the Phase II endpoint has not been reached, then the team should address the following issues: (1) If additional injection events are

  8. The Independent Technical Analysis Process

    SciTech Connect (OSTI)

    Duberstein, Corey A.; Ham, Kenneth D.; Dauble, Dennis D.; Johnson, Gary E.

    2007-04-13

    The Bonneville Power Administration (BPA) contracted with the Pacific Northwest National Laboratory (PNNL) to provide technical analytical support for system-wide fish passage information (BPA Project No. 2006-010-00). The goal of this project was to produce rigorous technical analysis products using independent analysts and anonymous peer reviewers. In the past, regional parties have interacted with a single entity, the Fish Passage Center to access the data, analyses, and coordination related to fish passage. This project provided an independent technical source for non-routine fish passage analyses while allowing routine support functions to be performed by other well-qualified entities.

  9. Independent Oversight Review, Babcock & Wilcox Technical Services Y-12, LLC- July 2012

    Broader source: Energy.gov [DOE]

    Review of the Long Lead Procurement Processed Used by Babcock & Wilcox Technical Services Y-12, LLC for the Uranium Processing Facility Project

  10. 1?10 kW Stationary Combined Heat and Power Systems Status and Technical Potential: Independent Review

    SciTech Connect (OSTI)

    Maru, H. C.; Singhal, S. C.; Stone, C.; Wheeler, D.

    2010-11-01

    This independent review examines the status and technical potential of 1-10 kW stationary combined heat and power fuel cell systems and analyzes the achievability of the DOE cost, efficiency, and durability targets for 2012, 2015, and 2020.

  11. INDEPENDENT TECHNICAL REVIEW OF THE C-400 INTERIM REMEDIAL PROJECT PHASE I RESULTS, PADUCAH, KENTUCKY

    SciTech Connect (OSTI)

    Looney, B.; Rossabi, J.; Stewart,L.; Richards, W.

    2010-10-29

    The groundwater and soil in the vicinity of the C-400 Building at the Paducah Gaseous Diffusion Plant (PGDP), is contaminated with substantial quantities of industrial solvents, primarily trichoroethene (TCE). This solvent 'source' is recognized as a significant challenge and an important remediation target in the overall environmental cleanup strategy for PGDP. Thus, the cleanup of the C-400 TCE Source is a principal focus for the Department of Energy (DOE) and its contractors, and for PGDP regulators and stakeholders. Using a formal investigation, feasibility study and decision process, Electrical Resistance Heating (ERH) was selected for the treatment of the soil and groundwater in the vicinity of C-400. ERH was selected as an interim action to remove 'a significant portion of the contaminant mass of TCE at the C-400 Cleaning Building area through treatment' with the longer term goal of reducing 'the period the TCE concentration in groundwater remains above its Maximum Contaminant Level (MCL).' ERH is a thermal treatment that enhances the removal of TCE and related solvents from soil and groundwater. The heterogeneous conditions at PGDP, particularly the high permeability regional gravel aquifer (RGA), are challenging to ERH. Thus, a phased approach is being followed to implement this relatively expensive and complex remediation technology. Conceptually, the phased approach encourages safety and efficiency by providing a 'lessons learned' process and allowing appropriate adjustments to be identified and implemented prior to follow-on phase(s) of treatment. More specifically, early deployment targeted portions of the challenging RGA treatment zone with relatively little contamination reducing the risk of adverse collateral impacts from underperformance in terms of heating and capture. Because of the importance and scope of the C-400 TCE source remediation activities, DOE chartered an Independent Technical Review (ITR) in 2007 to assess the C-400 ERH plans prior

  12. 1…10 kW Stationary Combined Heat and Power Systems Status and Technical Potential: Independent Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -10 kW Stationary Combined Heat and Power Systems Status and Technical Potential National Renewable Energy Laboratory 1617 Cole Boulevard * Golden, Colorado 80401 303-275-3000 * www.nrel.gov NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Contract No. DE-AC36-08GO28308 Independent Review Published for the U.S. Department of Energy Hydrogen and Fuel Cells Program

  13. INDEPENDENT TECHNICAL ASSESSMENT OF MANAGEMENT OF STORMWATER...

    Office of Scientific and Technical Information (OSTI)

    INDEPENDENT TECHNICAL ASSESSMENT OF MANAGEMENT OF STORMWATER AND WASTEWATER AT THE ... Title: INDEPENDENT TECHNICAL ASSESSMENT OF MANAGEMENT OF STORMWATER AND WASTEWATER AT THE ...

  14. CONTAIN independent peer review

    SciTech Connect (OSTI)

    Boyack, B.E. [Los Alamos National Lab., NM (United States); Corradini, M.L. [Univ. of Wisconsin, Madison, WI (United States). Nuclear Engineering Dept.; Denning, R.S. [Battelle Memorial Inst., Columbus, OH (United States); Khatib-Rahbar, M. [Energy Research Inc., Rockville, MD (United States); Loyalka, S.K. [Univ. of Missouri, Columbia, MO (United States); Smith, P.N. [AEA Technology, Dorchester (United Kingdom). Winfrith Technology Center

    1995-01-01

    The CONTAIN code was developed by Sandia National Laboratories under the sponsorship of the US Nuclear Regulatory Commission (NRC) to provide integrated analyses of containment phenomena. It is used to predict nuclear reactor containment loads, radiological source terms, and associated physical phenomena for a range of accident conditions encompassing both design-basis and severe accidents. The code`s targeted applications include support for containment-related experimental programs, light water and advanced light water reactor plant analysis, and analytical support for resolution of specific technical issues such as direct containment heating. The NRC decided that a broad technical review of the code should be performed by technical experts to determine its overall technical adequacy. For this purpose, a six-member CONTAIN Peer Review Committee was organized and a peer review as conducted. While the review was in progress, the NRC issued a draft ``Revised Severe Accident Code Strategy`` that incorporated revised design objectives and targeted applications for the CONTAIN code. The committee continued its effort to develop findings relative to the original NRC statement of design objectives and targeted applications. However, the revised CONTAIN design objectives and targeted applications. However, the revised CONTAIN design objectives and targeted applications were considered by the Committee in assigning priorities to the Committee`s recommendations. The Committee determined some improvements are warranted and provided recommendations in five code-related areas: (1) documentation, (2) user guidance, (3) modeling capability, (4) code assessment, and (5) technical assessment.

  15. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Environmental Management (EM)

    in Technical Area-55 that were conducted July 18 through August 19, 2011. The independent review was performed by the U.S. Department of Energy's (DOE) Office of Safety and ...

  16. The Independent Technical Analysis Process Final Report 2006-2007.

    SciTech Connect (OSTI)

    Duberstein, Corey; Ham, Kenneth; Dauble, Dennis; Johnson, Gary

    2007-03-01

    The Bonneville Power Administration (BPA) contracted with the Pacific Northwest National Laboratory (PNNL) to provide technical analytical support for system-wide fish passage information (BPA Project No. 2006-010-00). The goal of this project was to produce rigorous technical analysis products using independent analysts and anonymous peer reviewers. This project provided an independent technical source for non-routine fish passage analyses while allowing routine support functions to be performed by other well-qualified entities. The Independent Technical Analysis Process (ITAP) was created to provide non-routine analysis for fish and wildlife agencies and tribes in particular and the public in general on matters related to juvenile and adult salmon and steelhead passage through the mainstem hydrosystem. The process was designed to maintain the independence of analysts and reviewers from parties requesting analyses, to avoid potential bias in technical products. The objectives identified for this project were to administer a rigorous, transparent process to deliver unbiased technical assistance necessary to coordinate recommendations for storage reservoir and river operations that avoid potential conflicts between anadromous and resident fish. Seven work elements, designated by numbered categories in the Pisces project tracking system, were created to define and accomplish project goals as follows: (1) 118 Coordination - Coordinate technical analysis and review process: (a) Retain expertise for analyst/reviewer roles. (b) Draft research directives. (c) Send directive to the analyst. (d) Coordinate two independent reviews of the draft report. (e) Ensure reviewer comments are addressed within the final report. (2) 162 Analyze/Interpret Data - Implement the independent aspects of the project. (3) 122 Provide Technical Review - Implement the review process for the analysts. (4) 132 Produce Annual Report - FY06 annual progress report with Pisces Disseminate (5) 161

  17. INDEPENDENT TECHNICAL REVIEW OF THE BUILDING 100 PLUME, FORMER DOE PINELLAS SITE (YOUNG - RAINEY STAR CENTER), LARGO, FLORIDA

    SciTech Connect (OSTI)

    Eddy-Dilek, C.; Rossabi, J.; Amidon, M.; Riha, B.; Kaback, D.

    2010-07-30

    Contaminated groundwater associated with Building 100 at the Young-Rainey Science, Technology, and Research Center, formerly the DOE Pinellas plant, is the primary remedial challenge that remains to be addressed at the site. Currently, Building 100 is an active industrial facility that is now owned and operated by the Pinellas county government. Groundwater samples collected from monitoring wells recently installed near the southern boundary of the site suggest that contaminated groundwater has migrated off the plant site. In response to the challenges presented by the Building 100 plume, the Office of Legacy Management (LM) requested assistance from the DOE Office of Groundwater and Soil Remediation (EM-32) to provide a review team to make technical recommendations so that they can efficiently and effectively address characterization and remediation of the plume. The review team was unanimous in the conclusion that a dynamic strategy that combines a phased implementation of direct push samplers, sensors, and tools can be used to better delineate the extent of contamination, control plume migration, and rapidly remediate the contaminated groundwater at the site. The initial efforts of the team focused on reviewing the site history and data, organizing the information into a conceptual model, identifying appropriate technologies, and recommending an integrated strategy. The current groundwater data from the site indicate a two-lobed plume extending to the east and south. To the east vinyl chloride is the primary contaminant of concern, to the south, vinyl chloride and cis1, 2-DCE are the primary contaminants. The limited data that are available suggest that reductive dechlorination of the TCE is already occurring but is not sufficient to prevent offsite migration of low concentrations of TCE daughter products. The team recommends that DOE pursue a strategy that builds on the natural cleansing capacity of the subsurface with reductive methods including biostimulation

  18. Technical Review Panel Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    TRP Report v7, 12 Aug 2012 TRP Report Final December 2012 Advanced Reactor Concepts Technical Review Panel Report Evaluation and Identification of future R&D on eight Advanced Reactor Concepts, conducted April - September 2012 December 2012 Public release version 2 Public release version 3 Table of Contents Summary ................................................................................................................................... 4 1. Overview of the Technical Review Panel

  19. External Technical Review Report

    Office of Environmental Management (EM)

    ... from conducting independent reviews of project issues, as needed.) Requests initiated by ... The expectation is that Field Offices and Projects will forecast, schedule and fund all ...

  20. Independent Oversight Review, Savannah River Site Tritium Facilities...

    Broader source: Energy.gov (indexed) [DOE]

    Facilities - June 2012 More Documents & Publications Technical Qualification Program Self-Assessment Report - Savannah River Site Office - 2011 Independent Oversight Review,...

  1. INDEPENDENT COST REVIEW (ICR)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Report SOP Standard Operating Procedure TEC Total Estimated Cost TIPR Technical ... FY13 FY14 FY15 FY16 Total PED Construction TEC OPC TPC Note: above values include MR...

  2. Independent Oversight Review of the Technical Area 55 Safety Class Fire Suppression System at Los Alamos National Laboratory, December 2013

    Office of Environmental Management (EM)

    Technical Area 55 Safety Class Fire Suppression System at Los Alamos National Laboratory December 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose .................................................................................................................................................... 1 2.0 Background

  3. External Independent Review (EIR) Standard Operating Procedure...

    Broader source: Energy.gov (indexed) [DOE]

    External Independent Review (EIR) Standard Operating Procedure (SOP) - September 2010 More Documents & Publications External Independent Review (EIR) Standard Operating Procedure...

  4. Independent Oversight Review, Los Alamos National Laboratory - December

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2013 | Department of Energy December 2013 Independent Oversight Review, Los Alamos National Laboratory - December 2013 December 2013 Review of the Technical Area 55 Safety Class Fire Suppression System at Los Alamos National Laboratory This report documents the results of an independent oversight review of the Los Alamos National Laboratory (LANL) Technical Area 55 Plutonium Facility safety class fire suppression system (FSS), concurrent with a scheduled Los Alamos Field Office vital safety

  5. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Environmental Management (EM)

    Independent Oversight Review, Los Alamos National Laboratory - January 2012 Independent Oversight Review, Los Alamos National Laboratory Chemistry and Metallurgy Research Facility ...

  6. External Independent Review (EIR) Standard Operating Procedure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    External Independent Review (EIR) Standard Operating Procedure (SOP) October 2008 External Independent Review (EIR) Standard Operating Procedure (SOP) October 2008 External ...

  7. Independent Oversight Review, Pantex Plant, December 2013 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Pantex Plant, December 2013 Independent Oversight Review, Pantex Plant, December 2013 December 2013 Targeted Review of the Safety Significant Blast Door and Personnel Door Interlock Systems and Review of Federal Assurance Capability at the Pantex Plant This report documents the results of an independent oversight review of safety significant Blast Door Interlock and personnel Door Interlock Systems at the Pantex Plant. The Pantex Plant is operated by Babcock & Wilcox Technical

  8. Independent Oversight Review, Pantex Plant - February 2012 |...

    Office of Environmental Management (EM)

    Plant - February 2012 Independent Oversight Review, Pantex Plant - February 2012 February 2012 Review of the Pantex Plant Implementation Verification Review Processes This report ...

  9. Independent Oversight Review, Bonneville Power Administration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (Independent Oversight), within the Office of Health, Safety and Security, conduct an independent review of the Bonneville Power Administration (BPA) safety management program. ...

  10. Independent Oversight Special Review, Bechtel Jacobs Company...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bechtel Jacobs Company, LLC - July 2011 Independent Oversight Special Review, Bechtel Jacobs Company, LLC - July 2011 July 2011 Special Review of the SuspectCounterfeit Items ...

  11. Independent Oversight Review, Advanced Mixed Waste Treatment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Advanced Mixed Waste Treatment Project - April 2013 Independent Oversight Review, Advanced Mixed Waste Treatment Project - April 2013 April 2013 Review of Radiation Protection...

  12. Independent Oversight Review, Richland Operations Office - November...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Richland Operations Office - November 2012 Independent Oversight Review, Richland Operations Office - November 2012 November 2012 Review of the Richland Operations Office Oversight...

  13. Independent Oversight Targeted Review, Sandia National Laboratories...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 2014 Independent Oversight Targeted Review, Sandia National Laboratories - April 2014 April 2014 Targeted Review of the Sandia National Laboratories Federal Assurance ...

  14. Independent Oversight Review of Integrated Safety Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... on LSO's most recent assessment of LLNL's contractor ... and the request for peer reviews and independent HSS reviews, show that LSO is a learning organization and that ...

  15. Independent Oversight Review, Nevada National Security - May...

    Office of Environmental Management (EM)

    National Security - May 2013 Independent Oversight Review, Nevada National Security - May 2013 May 2013 Review of the Nevada National Security Site Criticality Safety Program ...

  16. Independent Oversight Review, Sodium Bearing Waste Treatment...

    Office of Environmental Management (EM)

    This report documents the results of an independent review of the Sodium Bearing Waste Treatment Project-Integrated Waste Treatment Unit Federal Operational Readiness Review. ...

  17. Independent Oversight Review, DOE Headquarters Facilities - March...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review of the Headquarters Facilities Emergency Response Plans This report provides the results of an independent review of the emergency response plans for the Department of ...

  18. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review of the Consequence Assessment Program at the Los Alamos National Laboratory This report provides the results of an independent review of the Los Alamos National Laboratory ...

  19. Independent Oversight Review, Rocky Flats Environmental Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review of the Rocky Flats Environmental Technology Site Transportation Emergency Management Program This report provides the results of an independent review of the Transportation ...

  20. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review of the Emergency Response Organization at the Los Alamos National Laboratory This report provides the results of an independent review of the Los Alamos National Laboratory ...

  1. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    Independent Oversight Review, Waste Treatment and Immobilization Plant Project - October 2010 October 2010 Review of Nuclear Safety Culture at the Hanford Site Waste Treatment and ...

  2. Independent Oversight Review, Sodium Bearing Waste Treatment...

    Office of Environmental Management (EM)

    Independent Oversight Review, Sodium Bearing Waste Treatment Project - Contractor - June 2012 June 2012 Review of the Sodium Bearing Waste Treatment Project - Integrated Waste ...

  3. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    January 2013 Independent Oversight Review, Waste Treatment and Immobilization Plant - January 2013 January 2013 Review of the Hanford Waste Treatment and Immobilization Plant ...

  4. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    October 2012 Independent Oversight Review, Waste Treatment and Immobilization Plant - October 2012 October 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant ...

  5. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    May 2013 Independent Oversight Review, Waste Treatment and Immobilization Plant - May 2013 May 2013 Review of the Hanford Site Waste Treatment and Immobilization Plant Construction ...

  6. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    August 2012 Independent Oversight Review, Waste Treatment and Immobilization Plant - August 2012 August 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant ...

  7. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 2011 Independent Oversight Review, Los Alamos National Laboratory - September 2011 September 2011 Review of the Facility Centered Assessment of the Los Alamos National ...

  8. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Oversight Review, Waste Treatment and Immobilization Plant - March 2012 March 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant Project ...

  9. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant...

    Office of Environmental Management (EM)

    Plant - November 2013 Independent Oversight Review, Portsmouth Gaseous Diffusion Plant - November 2013 November 5, 2013 Review of Preparedness for Severe Natural Phenomena Events ...

  10. Independent Oversight Review, Oak Ridge National Laboratory ...

    Energy Savers [EERE]

    National Laboratory - January 2013 Independent Oversight Review, Oak Ridge National Laboratory - January 2013 January 2013 Review of the Oak Ridge National Laboratory High Flux...

  11. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Environmental Management (EM)

    Laboratory Chemistry and Metallurgy Research Facility - January 2012 Independent Oversight Review, Los Alamos National Laboratory Chemistry and Metallurgy Research Facility - ...

  12. Independent Oversight Review, West Valley Demonstration Project...

    Office of Environmental Management (EM)

    West Valley Demonstration Project Transportation - September 2000 Independent Oversight Review, West Valley Demonstration Project Transportation - September 2000 September 2000 ...

  13. Independent Oversight Review, National Energy Technology Laboratory...

    Energy Savers [EERE]

    Review of the Emergency Management Program Technical Basis and Emergency Preparedness at the National Energy Technology Laboratory This report documents the results of an ...

  14. Mechanical Engineering Department Technical Review

    SciTech Connect (OSTI)

    Carr, R.B.; Denney, R.M.

    1981-07-01

    The Mechanical Engineering Department Technical Review is published to inform readers of various technical activities within the Department, promote exchange of ideas, and give credit to personnel who are achieving the results. The report is presented in two parts: technical achievements and publication abstracts. The first is divided into seven sections, each of which reports on an engineering division and its specific activities related to nuclear tests, nuclear explosives, weapons, energy systems, engineering sciences, magnetic fusion, and materials fabrication.

  15. Mechanical engineering department technical review

    SciTech Connect (OSTI)

    Carr, R.B. Denney, R.M.

    1981-01-01

    The Mechanical Engineering Department Technical Review is published to: (1) inform the readers of various technical activities within the department, (2) promote exchange of ideas, and (3) give credit to the personnel who are achieving the results. The report is formatted into two parts: technical acievements and publication abstracts. The first is divided into eight sections, one for each division in the department providing the reader with the names of the personnel and the division accomplishing the work.

  16. External Technical Reviews | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services Waste Management Tank Waste and Waste Processing External Technical Reviews External Technical Reviews Documents Available for Download March 31, 2006 Hanford ETR...

  17. Independent Oversight Focused Program Review, Argonne National

    Office of Environmental Management (EM)

    Laboratory-West - May 2001 | Department of Energy Program Review, Argonne National Laboratory-West - May 2001 Independent Oversight Focused Program Review, Argonne National Laboratory-West - May 2001 May 2001 Focused Program Review at Argonne National Laboratory-West This report provides the results of an independent focused review of the Emergency Management Program at the Department of Energy's Argonne National Laboratory-West site that was conducted by the Office of Independent Oversight

  18. Independent Oversight Review, West Valley Demonstration Project

    Office of Environmental Management (EM)

    Transportation - September 2000 | Department of Energy West Valley Demonstration Project Transportation - September 2000 Independent Oversight Review, West Valley Demonstration Project Transportation - September 2000 September 2000 Transportation Emergency Management Review of the West Valley Demonstration Project (WVDP) and National Transportation Program (NTP)/Transportation Compliance Evaluation/Assistance Program (TCEAP) This report provides the results of an independent review of the

  19. Independent Oversight Special Review, Headquarters - August 2008...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Independent Oversight Special Review, Department of Energy sites - February 2008 Focus Group Meeting (Topical Meeting) 10 CFR 851 Worker Safety and ...

  20. External Independent Review (EIR) Standard Operating Procedure...

    Office of Environmental Management (EM)

    Standard Operating Procedure (SOP) May 2016 External Independent Review (EIR) Standard ... The objectives of this EIR Standard Operating Procedure (SOP) document are to clarify EIR ...

  1. Independent Oversight Review, Waste Treatment and Immobilization...

    Broader source: Energy.gov (indexed) [DOE]

    Hanford Site Waste Treatment and Immobilization Plant Project Construction Quality This report documents the results of an independent oversight review of selected aspects of...

  2. External Independent Review (EIR) Standard Operating Procedure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Office of Project Management Oversight and Assessments (PMOA) performs External Independent Reviews (EIRs) to provide Project Management Executives (PMEs), senior leaders ...

  3. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Environmental Management (EM)

    The independent review was one part of a targeted assessment of fire protection at nuclear facilities across the DOE complex, including National Nuclear Security Administration ...

  4. Background Information for Independent Review Team. Lifecycle...

    Office of Scientific and Technical Information (OSTI)

    Background Information for Independent Review Team. Lifecycle Plan and FY14 Quarterly ... Visit OSTI to utilize additional information resources in energy science and technology. A ...

  5. Independent Oversight Review, Richland Operations Office and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and work management and control processes in the areas of conduct of operations, quality assurance, and integrated safety management. Independent Oversight Review, Richland...

  6. Independent Oversight Review, Savannah River Operations Office...

    Office of Environmental Management (EM)

    - July 2013 July 2013 Review of the Employee Concerns Program at the Savannah River ... O 442.1, DEPARTMENT OF ENERGY EMPLOYEE CONCERNS PROGRAM Independent Activity ...

  7. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Health, Safety and Security (HSS), conducted an independent review of the Los Alamos National Laboratory (LANL) Weapons Engineering Tritium Facility (WETF) safety significant...

  8. External Independent Review (EIR) Standard Operating Procedure...

    Broader source: Energy.gov (indexed) [DOE]

    The objectives of this EIR Standard Operating Procedure (SOP) document are to clarify EIR ... PDF icon External Independent Review (EIR) Standard Operating Procedure (SOP), Revision 3, ...

  9. Independent Oversight Review, Waste Treatment and Immobilization...

    Broader source: Energy.gov (indexed) [DOE]

    Plant Construction Quality This report documents the results of an independent oversight review of Construction Quality at the Hanford Site Waste Treatment and Immobilization Plant ...

  10. Independent Oversight Review, Los Alamos National Laboratory- July 2012

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of the Los Alamos National Laboratory Implementation Verification Review at Technical Area-55

  11. Radiography Facility - Building 239 Independent Validation Review...

    Office of Scientific and Technical Information (OSTI)

    The purpose of this task was to perform an Independent Validation Review to evaluate the ... The review follows the outline developed for Milestone 1 of the PEP, which is based on the ...

  12. Independent Oversight Targeted Review, Sandia National Laboratories -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 2014 | Department of Energy April 2014 Independent Oversight Targeted Review, Sandia National Laboratories - April 2014 April 2014 Targeted Review of the Sandia National Laboratories Federal Assurance Capability The U.S. Department of Energy (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), conducted an independent review of the performance of the DOE Sandia Field Office safety oversight of the Sandia Corporation. The review was

  13. Joint Integration Office Independent Review Committee annual report, 1985

    SciTech Connect (OSTI)

    Not Available

    1986-08-01

    Comprised of seven persons with extensive experience in the issues of nuclear waste, the Independent Review Committee (IRC) provides independent and objective review of Defense Transuranic Waste Program (DTWP) activities managed by the Joint Integration Office (JIO), formerly the Defense Transuranic Waste Lead Organization (TLO). The Committee is ensured a broad, interdisciplinary perspective since its membership includes representatives from the fields of nuclear engineering, nuclear waste transportation, industrial quality control, systems and environmental engineering and state and local government. The scope of IRC activities includes overall review of specific TLO plans, projects and activities, and technical review of particular research and development projects. The Committee makes specific suggestions and recommendations based upon expertise in the field of TRU Waste Management. The IRC operates as a consulting group, under an independent charter providing objective review of program activities. This report summarizes the 12 major topics reviewed by the committee during 1985.

  14. Independent Peer Review Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Peer Review Program Independent Peer Review Program 2014 PERT Charter.pdf (680.02 KB) More Documents & Publications Hydropower Vision Task Force Charter Procurement Evaluation & Re-Engineering Team (PERT) and Establishment of a 5-year Cycle with Corresponding Schedule Policy Guidance Memorandum #36 SES Competitive Staffing Procedures

  15. Independent Oversight Review, Bonneville Power Administration Safety

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Program - March 2014 | Department of Energy Bonneville Power Administration Safety Management Program - March 2014 Independent Oversight Review, Bonneville Power Administration Safety Management Program - March 2014 March 2014 Oversight Review of the Bonneville Power Administration Safety Management Program Bonneville Power Administration management requested that the U.S. Department of Energy Office of Enforcement and Oversight (Independent Oversight), within the Office of

  16. Mechanical Engineering Department technical review

    SciTech Connect (OSTI)

    Carr, R.B.; Abrahamson, L.; Denney, R.M.; Dubois, B.E

    1982-01-01

    Technical achievements and publication abstracts related to research in the following Divisions of Lawrence Livermore Laboratory are reported in this biannual review: Nuclear Fuel Engineering; Nuclear Explosives Engineering; Weapons Engineering; Energy Systems Engineering; Engineering Sciences; Magnetic Fusion Engineering; and Material Fabrication. (LCL)

  17. Independent Oversight Review, National Nuclear Security Administration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Production Office - February 2014 | Department of Energy National Nuclear Security Administration Production Office - February 2014 Independent Oversight Review, National Nuclear Security Administration Production Office - February 2014 February 2014 Review of the National Nuclear Security Administration Production Office Readiness Review Program The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security,

  18. External Technical Reviews | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste Management » Tank Waste and Waste Processing » External Technical Reviews External Technical Reviews Documents Available for Download November 15, 2012 External Technical Review Report This document has been developed to guide individuals and teams who will be involved in External Technical Reviews (ETR) of U.S. Department of Energy's Office of Environmental Management (DOE-EM) projects. September 1, 2011 Peer Review of the ASCEM Program 2010 Full Document and Summary Versions are

  19. External Technical Review Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    External Technical Review Report External Technical Review Report This document has been developed to guide individuals and teams who will be involved in External Technical Reviews (ETR) of U.S. Department of Energy's Office of Environmental Management (DOE-EM) projects. External Technical Review Report (2.57 MB) More Documents & Publications Technology Readiness Assessment Report Compilation of ETR Summaries Major Risk Factors Integrated Facility Disposition Project - Oak Ridge

  20. Hydrogen Production Cost Estimate Using Biomass Gasification: Independent Review

    SciTech Connect (OSTI)

    none,

    2011-10-01

    This independent review is the conclusion arrived at from data collection, document reviews, interviews and deliberation from December 2010 through April 2011 and the technical potential of Hydrogen Production Cost Estimate Using Biomass Gasification. The Panel reviewed the current H2A case (Version 2.12, Case 01D) for hydrogen production via biomass gasification and identified four principal components of hydrogen levelized cost: CapEx; feedstock costs; project financing structure; efficiency/hydrogen yield. The panel reexamined the assumptions around these components and arrived at new estimates and approaches that better reflect the current technology and business environments.

  1. SCDAP/RELAP5 independent peer review

    SciTech Connect (OSTI)

    Corradini, M.L. . Dept. of Nuclear Engineering); Dhir, V.K. Santa Monica, CA ); Haste, T.J. ); Heames, T.J. ); Jenks, R.P. ); Kelly, J.E. (Sandia National Labs., Albuquerque, NM

    1993-01-01

    The SCDAP/RELAP5 code has been developed for best-estimate transient simulation of light-water-reactor coolant systems during severe accidents. The newest version of the code is SCDAP/RELAP5/MOD3. The US Nuclear Regulatory Commission (NRC) decided that there was a need for a broad technical review of the code by recognized experts to determine overall technical adequacy, even though the code is still under development. For this purpose, an eight-member SCDAP/RELAP5 Peer Review Committee was organized, and the outcome of the review should help the NRC prioritize future code-development activity. Because the code is designed to be mechanistic, the Committee used a higher standard for technical adequacy than was employed in the peer review of the parametric MELCOR code. The Committee completed its review of the SCDAP/RELAP5 code, and the findings are documented in this report. Based on these findings, recommendations in five areas are provided: (1) phenomenological models, (2) code-design objectives, (3) code-targeted applications, (4) other findings, and (5) additional recommendations.

  2. Microsoft Word - HABAdv#228_Independent Review of BerylliumProgram...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HAB Consensus Advice 228 Subject: Independent Review of Beryllium Program Adopted: ... Box 450 (H6-60) Richland, WA 99352 Re: Independent Review of Beryllium Program Dear Ms. ...

  3. Pantex Falling Man - Independent Review Panel Report.

    SciTech Connect (OSTI)

    Bertolini, Louis; Brannon, Nathan; Olson, Jared; Price, Bernard; Wardle, Robert; Steinzig, Mike; Winfield, Michael

    2014-11-01

    Consolidated Nuclear Security (CNS) Pantex took the initiative to organize a Review Panel of subject matter experts to independently assess the adequacy of the Pantex Tripping Man Analysis methodology. The purpose of this report is to capture the details of the assessment including the scope, approach, results, and detailed Appendices. Along with the assessment of the analysis methodology, the panel evaluated the adequacy with which the methodology was applied as well as congruence with Department of Energy (DOE) standards 3009 and 3016. The approach included the review of relevant documentation, interactive discussion with Pantex staff, and the iterative process of evaluating critical lines of inquiry.

  4. Independent Oversight Review, National Energy Technology Laboratory – May 2014

    Broader source: Energy.gov [DOE]

    Review of the Emergency Management Program Technical Basis and Emergency Preparedness at the National Energy Technology Laboratory

  5. INDEPENDENT TECHNICAL REVIEW OF THE FOCUSED FEASIBILITY STUDY AND PROPOSED PLAN FOR DESIGNATED SOLID WASTE MANAGEMENT UNITS CONTRIBUTING TO THE SOUTHWEST GROUNDWATER PLUME AT THE PADUCAH GASEOUS DIFFUSION PLANT

    SciTech Connect (OSTI)

    Looney, B.; Eddy-Dilek, C.; Amidon, M.; Rossabi, J.; Stewart, L.

    2011-05-31

    The U. S. Department of Energy (DOE) is currently developing a Proposed Plan (PP) for remediation of designated sources of chlorinated solvents that contribute contamination to the Southwest (SW) Groundwater Plume at the Paducah Gaseous Diffusion Plant (PGDP), in Paducah, KY. The principal contaminants in the SW Plume are trichloroethene (TCE) and other volatile organic compounds (VOCs); these industrial solvents were used and disposed in various facilities and locations at PGDP. In the SW plume area, residual TCE sources are primarily in the fine-grained sediments of the Upper Continental Recharge System (UCRS), a partially saturated zone that delivers contaminants downward into the coarse-grained Regional Gravel Aquifer (RGA). The RGA serves as the significant lateral groundwater transport pathway for the plume. In the SW Plume area, the four main contributing TCE source units are: (1) Solid Waste Management Unit (SWMU) 1 / Oil Landfarm; (2) C-720 Building TCE Northeast Spill Site (SWMU 211A); (3) C-720 Building TCE Southeast Spill Site (SWMU 211B); and (4) C-747 Contaminated Burial Yard (SWMU 4). The PP presents the Preferred Alternatives for remediation of VOCs in the UCRS at the Oil Landfarm and the C-720 Building spill sites. The basis for the PP is documented in a Focused Feasibility Study (FFS) (DOE, 2011) and a Site Investigation Report (SI) (DOE, 2007). The SW plume is currently within the boundaries of PGDP (i.e., does not extend off-site). Nonetheless, reasonable mitigation of the multiple contaminant sources contributing to the SW plume is one of the necessary components identified in the PGDP End State Vision (DOE, 2005). Because of the importance of the proposed actions DOE assembled an Independent Technical Review (ITR) team to provide input and assistance in finalizing the PP.

  6. Independent Cost Review (ICR) and Independent Cost Estimate (ICE) Standard

    Energy Savers [EERE]

    Department of Energy ITP Aluminum: Technical Working Group on Inert Anode Technologies ITP Aluminum: Technical Working Group on Inert Anode Technologies inertech.pdf (8.16 MB) More Documents & Publications ITP Aluminum: Energy and Environmental Profile of the U.S. Aluminum Industry EIS-0333: Draft Environmental Impact Statement Better Buildings Network View | September 2015

    IVANPAH IVANPAH DOE-LPO_Project-Posters_CSP_Ivanpah.pdf (1.39 MB) More Documents & Publications Hearing

  7. Independent Oversight Review, Savannah River Site Salt Waste...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security, conducted an independent review ...

  8. Independent Oversight Review, Hanford Site K-West Annex Facility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The U.S. Department of Energy Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security, conducted an independent review of ...

  9. External Technical Reviews | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    been developed to guide individuals and teams who will be involved in External Technical Reviews (ETR) of U.S. Department of Energy's Office of Environmental Management (DOE-EM)...

  10. Independent Oversight Follow-up Review, Idaho Site - January...

    Office of Environmental Management (EM)

    Follow-up Review of Activity-Level Implementation of Radiation Controls and Radiological ... This report documents the results of an independent oversight review of radiation ...

  11. Independent Oversight Follow-up Review, Savannah River National...

    Office of Environmental Management (EM)

    Review, Los Alamos National Laboratory - December 2013 Independent Oversight Review, Los Alamos National Laboratory Chemistry and Metallurgy Research Facility - January 2012

  12. Independent Oversight Review, Hanford Waste Treatment and Immobilizati...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 2014 Independent Oversight Review, Hanford Waste Treatment and Immobilization Plant - March 2014 March 2014 Review of the Hanford Site Waste Treatment and Immobilization...

  13. Independent Oversight Review, Hanford Site CH2M Hill Plateau...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CH2M Hill Plateau Remediation Company - November 2012 Independent Oversight Review, Hanford Site CH2M Hill Plateau Remediation Company - November 2012 November 2012 Review of the...

  14. Independent Oversight Review, Hanford Tank Farms - December 2012...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - December 2012 December 2012 Review of the Hanford Tank Farms Radiological Controls Activity-Level Implementation This report documents an independent review by the Office of...

  15. Independent Oversight Review, Hanford Site Waste Treatment and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste Treatment and Immobilization Plant, August 2013 Independent Oversight Review, Hanford Site Waste Treatment and Immobilization Plant, August 2013 August 2013 Review of the ...

  16. Independent Oversight Special Review, Department of Energy sites...

    Office of Environmental Management (EM)

    of Energy sites - February 2008 February 2008 Independent Oversight Special Review of Workplace Exposure Monitoring This report provides the results of a Special Review of...

  17. Independent Oversight Review, Waste Isolation Pilot Plant - November...

    Office of Environmental Management (EM)

    Independent Oversight Review, Waste Isolation Pilot Plant - November 2012 November 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Waste Isolation Pilot ...

  18. Independent Oversight Targeted Review, Y-12 National Security...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Y-12 National Security Complex - February 2012 Independent Oversight Targeted Review, Y-12 National Security Complex - February 2012 February 2012 Targeted Review of Site...

  19. Independent Oversight Special Review, Rocky Flats Closure Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rocky Flats Closure Project Site - April 2001 Independent Oversight Special Review, Rocky Flats Closure Project Site - April 2001 April 2001 Special Review of the Rocky Flats...

  20. Independent Oversight Review, Hanford Site Waste Treatment and...

    Energy Savers [EERE]

    Waste Treatment and Immobilization Plant - June 2014 Independent Oversight Review, Hanford Site Waste Treatment and Immobilization Plant - June 2014 June 2014 Review of the Hanford ...

  1. Independent Oversight Review, Savannah River Site Salt Waste...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 2013 Independent Oversight Review, Savannah River Site Salt Waste Processing Facility - August 2013 August 2013 Review of the Savannah River Site Salt Waste Processing...

  2. Independent Oversight Review, Waste Isolation Pilot Plant - April...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 2013 Independent Oversight Review, Waste Isolation Pilot Plant - April 2013 April 2013 Review of the Waste Isolation Pilot Plant Work Planning and Control Activities The...

  3. Independent Oversight Review, Los Alamos Site Office - March...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site Office - March 2012 Independent Oversight Review, Los Alamos Site Office - March 2012 March 2012 Review of the Los Alamos Site Office Safety System Oversight Program ...

  4. Review of Used Nuclear Fuel Storage and Transportation Technical...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review of Used Nuclear Fuel Storage and Transportation Technical Gap Analysis Review of Used Nuclear Fuel Storage and Transportation Technical Gap Analysis While both wet and dry...

  5. Advance Reactor Concepts Technical Review Panel Public Report...

    Office of Environmental Management (EM)

    Advance Reactor Concepts Technical Review Panel Public Report Advance Reactor Concepts Technical Review Panel Public Report The Office of Nuclear Energy supports research and ...

  6. Independent Review of Tank 241-AY-101 Fitness for Service

    SciTech Connect (OSTI)

    Stewart, Charles W.; Bush, Spencer H.; Delegard, Calvin H.; Elmore, Monte R.; Johnson, A. Burton; Pardini, Allan F.; Posakony, Gerald J.; Simonen, Fredric A.; Terry, Michael T.; Zapp, Philip E.

    2003-02-28

    Video inspections in the annulus of Hanford double-shell waste storage tank 241-AY-101 in 2001 and earlier showed rust over large areas of the primary and secondary tank walls. These observations led to extensive on-destructive inspections and analyses to determine the extent and severity of the corrosion and correction of several operational deficiencies that contributed to the problem. PNNL has performed an independent review of the accumulated evidence from these efforts to determine whether unacceptable conditions were corrected and the current condition of the tank meets or exceeds technical and operational requirements. The findings of this review are the subject of this report. The conclusion is that AY-101 is fit for service without restriction subject to several recommendations for further inspections and analyses.

  7. Independent Oversight Review of the Uranium Processing Facilkity...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A-1 Appendix B: Key Documents Reviewed, Interviews, and Observations ...... B-1 ii Acronyms B&W Y-12 Babcock & Wilcox Technical Services ...

  8. Technical Workshop: Annual Merit Review Lessons Learned on Alternative...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Merit Review Lessons Learned on Alternative Transportation Refueling Infrastructure Technical Workshop: Annual Merit Review Lessons Learned on Alternative Transportation ...

  9. Independent Oversight Review, Y-12 National Security Complex - June 2012 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Y-12 National Security Complex - June 2012 Independent Oversight Review, Y-12 National Security Complex - June 2012 June 2012 Review of the Y-12 Implementation Verification Review Processes This report documents the results of an independent review of the implementation verification review (IVR) processes at the Department of Energy's (DOE) Y-12 National Security Complex. The review was conducted March 12-30, 2012, by the DOE Office of Safety and Emergency Management

  10. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant - April

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2013 | Department of Energy Portsmouth Gaseous Diffusion Plant - April 2013 Independent Oversight Review, Portsmouth Gaseous Diffusion Plant - April 2013 April 2013 Review of the Integrated Safety Management System Phase I Verification Review at the Portsmouth Gaseous Diffusion Plant The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the U.S. Department of Energy (DOE) Portsmouth/Paducah

  11. Independent Oversight Review, National Nuclear Security Administration...

    Office of Environmental Management (EM)

    February 2014 Review of the National Nuclear Security Administration Production Office Readiness Review Program The U.S. Department of Energy (DOE) Office of Enforcement and ...

  12. Independent Oversight Targeted Review, Sandia National Laboratories...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Targeted Review, Sandia National Laboratories - November 2013 December 2013 Targeted Review of Activity-Level Implementation of Radiological Controls at Sandia National ...

  13. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant...

    Office of Environmental Management (EM)

    The contractor at PORTS is Fluor-Babcock & Wilcox Portsmouth (FBP). The HSS Office of Safety and Emergency Management Evaluations performed the onsite portion of the Independent ...

  14. Independent Oversight Review, Savannah River Site - September 2011 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy - September 2011 Independent Oversight Review, Savannah River Site - September 2011 September 2011 Review of the Implementation Verification Review Processes at the Savannah River Site Environmental Management Nuclear Facilities This report provides the results of an independent oversight review of the of the Implementation Verification Review (IVR) processes for the Environmental Management nuclear facilities at the Department of Energy's (DOE) Savannah River Site. The

  15. Independent Oversight Review of the Lawrence Livermore National Laboratory

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - March 2001 | Department of Energy Review of the Lawrence Livermore National Laboratory - March 2001 Independent Oversight Review of the Lawrence Livermore National Laboratory - March 2001 March 2001 Review of the Lawrence Livermore National Laboratory Health Services Department This report provides the results of an independent oversight review of the Health Services Division at the Department of Energy's (DOE) Lawrence Livermore National Laboratory. The review was performed March 19-21,

  16. Independent Oversight Review, Hanford Site - July 2012 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy - July 2012 Independent Oversight Review, Hanford Site - July 2012 July 2012 Review of the Hanford Site Employee Concerns Programs TThis report provides the results of an independent oversight review of the Hanford Site Employee Concerns Programs. The review was performed April 30-May 4, 2012, by the U.S. Department of Energy's (DOE) Office of Safety and Emergency Management Evaluations, which is within the DOE Office of Health, Safety and Security. The overall purpose of this review

  17. Energy Department Announces New Technical Review to Assess Black Cells at

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hanford's Waste Treatment Plant | Department of Energy Technical Review to Assess Black Cells at Hanford's Waste Treatment Plant Energy Department Announces New Technical Review to Assess Black Cells at Hanford's Waste Treatment Plant August 2, 2012 - 12:15pm Addthis News Media Contact (202) 586-4940 WASHINGTON -- The U.S. Department of Energy announced today that Secretary of Energy Steven Chu has assembled a group of independent technical experts to assess the Hanford Site's Waste

  18. Independent Oversight Review, Hanford Tank Farms - April 2013 | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Tank Farms - April 2013 Independent Oversight Review, Hanford Tank Farms - April 2013 April 2013 Review of Management of Safety Systems at the Hanford Tank Farms The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the management of safety class or safety significant structures, systems and components (hereinafter referred to as safety systems) at

  19. Independent Oversight Review, Lawrence Livermore National Laboratory - July

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2013 | Department of Energy Lawrence Livermore National Laboratory - July 2013 Independent Oversight Review, Lawrence Livermore National Laboratory - July 2013 July 2013 Review of Preparedness for Severe Natural Phenomena Events at the Lawrence Livermore National Laboratory The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the National Nuclear Security Administration (NNSA) Livermore

  20. Independent Oversight Review, Los Alamos National Laboratory - July 2014 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy July 2014 Independent Oversight Review, Los Alamos National Laboratory - July 2014 July 2014 Review of the Los Alamos National Laboratory Transuranic Waste Facility Safety Basis and Design Development The U.S. Department of Energy's (DOE) Office of Environment, Safety and Health Assessments, within the DOE Office of Independent Enterprise Assessments (formerly the Office of Health, Safety and Security), conducted an independent oversight review of the preliminary safety

  1. Independent Oversight Review, Paducah Site - April 2013 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Paducah Site - April 2013 Independent Oversight Review, Paducah Site - April 2013 April 2013 Review of Preparedness for Severe Natural Phenomena Events at the Paducah Site The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the U.S. Department of Energy (DOE) Paducah site's preparedness for severe natural phenomena events (NPEs). The HSS Office of Safety and Emergency Management

  2. Independent Oversight Review, Sandia Site Office - January 2013 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Sandia Site Office - January 2013 Independent Oversight Review, Sandia Site Office - January 2013 January 2013 Review of the Sandia Site Office Quality Assurance Assessment of the Manzano Nuclear Operations The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security, conducted an independent review of the U.S. Department of Energy (DOE) Sandia Site Office (SSO) quality assurance (QA) assessment of the Manzano nuclear

  3. Independent Oversight Review, Savannah River Site - January 2013 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy - January 2013 Independent Oversight Review, Savannah River Site - January 2013 January 2013 Review of the Savannah River Site, Waste Solidification Building, Construction Quality of Mechanical Systems Installation and Selected Aspects of Fire Protection System Design The Office of Enforcement and Oversight (Independent Oversight), within the U.S. Department of Energy (DOE) Office of Health, Safety and Security (HSS), conducted an independent review of construction

  4. Independent Oversight Review, Savannah River Site Salt Waste Processing

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Facility - April 2014 | Department of Energy Salt Waste Processing Facility - April 2014 Independent Oversight Review, Savannah River Site Salt Waste Processing Facility - April 2014 April 2014 Review of the Savannah River Site Salt Waste Processing Facility Construction Quality and Fire Protection Systems The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security, conducted an independent review of the

  5. Independent Oversight Review, Waste Isolation Pilot Plant - November 2012 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Isolation Pilot Plant - November 2012 Independent Oversight Review, Waste Isolation Pilot Plant - November 2012 November 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Waste Isolation Pilot Plant The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the U.S. Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) preparedness for severe

  6. Independent Oversight Review, Waste Treatment and Immobilization Plant -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January 2013 | Department of Energy January 2013 Independent Oversight Review, Waste Treatment and Immobilization Plant - January 2013 January 2013 Review of the Hanford Waste Treatment and Immobilization Plant Black-Cell and Hard-To-Reach Pipe Spools Procurement Process and the Office of River Protection Audit of That Process The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted a concurrent independent review with

  7. Independent Oversight Review, Waste Treatment and Immobilization Plant -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    May 2013 | Department of Energy May 2013 Independent Oversight Review, Waste Treatment and Immobilization Plant - May 2013 May 2013 Review of the Hanford Site Waste Treatment and Immobilization Plant Construction Quality The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight) within the Office of Health, Safety and Security (HSS) conducted an independent review of selected aspects of construction quality at the Hanford Site Waste Treatment and

  8. Independent Oversight Review, Hanford K Basin and Cold Vacuum...

    Broader source: Energy.gov (indexed) [DOE]

    Hanford K Basin and Cold Vacuum Drying Facility Found Fuel Multi-Canister Overpack Operations This report provides the results of an independent oversight review of operations...

  9. Independent Oversight Review, Los Alamos National Laboratory- December 2011

    Broader source: Energy.gov [DOE]

    Review of the Independent Integrated Safety Management/Integrated Work Management Assessment of Research and Development and Programmatic Work at the Los Alamos National Laboratory

  10. Independent Oversight Review of DOE Headquarters Emergency Response...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 26, 2003 The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted a review of emergency response plans and performance at DOE ...

  11. Distributed Hydrogen Production from Natural Gas: Independent Review

    SciTech Connect (OSTI)

    Fletcher, J.; Callaghan, V.

    2006-10-01

    Independent review report on the available information concerning the technologies needed for forecourts producing 150 kg/day of hydrogen from natural gas.

  12. Independent Oversight Review, Hanford Site Tank Farms 222-S Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the implementation of the electrical safety management program (SMP) at the ...

  13. Independent Oversight Review, Portsmouth/Paducah Project Office...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This report provides the results of an independent review of the Department of Energy's ... The independentreview was performed January 31 - February 2, 2012, by the DOE Office of ...

  14. Distributed Hydrogen Production from Natural Gas: Independent Review Panel Report

    Broader source: Energy.gov [DOE]

    Independent review report on the available information concerning the technologies needed for forecourts producing 150 kg/day of hydrogen from natural gas.

  15. Independent Oversight Review, Idaho Site, March 2013 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site, March 2013 Independent Oversight Review, Idaho Site, March 2013 March 2013 Review of the Facility Representative Program at the Idaho Site The U.S. Department of Energy (DOE)...

  16. Independent Oversight Follow-up Review, Hanford Site - June 2011...

    Broader source: Energy.gov (indexed) [DOE]

    Follow-up Review of the Hanford Site Chronic Beryllium Disease Prevention Program This report provides the results of a follow-up independent oversight review of the Hanford Site...

  17. Independent Oversight Review, Portsmouth/Paducah Project Office - May 2012

    Energy Savers [EERE]

    - January 2012 | Department of Energy Savannah River National Laboratory - January 2012 Independent Oversight Follow-up Review, Savannah River National Laboratory - January 2012 January 2012 Follow-up Review of Implementation Verification Reviews at the Savannah River National Laboratory Savannah River Site This report provides the results of an independent review of the identification and implementation of safety basis hazard controls associated with "flashing spray release"

  18. Independent Oversight Review, Hanford Site Waste Treatment and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Immobilization Plant - June 2014 | Department of Energy Waste Treatment and Immobilization Plant - June 2014 Independent Oversight Review, Hanford Site Waste Treatment and Immobilization Plant - June 2014 June 2014 Review of the Hanford Site Waste Treatment and Immobilization Plant Construction Quality This report documents the results of an independent oversight review of selected aspects of construction quality at the Hanford Site Waste Treatment and Immobilization Plant. The review, which

  19. Independent Oversight Review, Idaho Site - November 2012 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Site - November 2012 Independent Oversight Review, Idaho Site - November 2012 November 2012 Review of Radiation Protection Program Implementation at the Idaho Site This report documents an independent review of radiation protection program implementation at the Idaho Site that was conducted by the U.S. Department of Energy's (DOE) Office of Safety and Emergency Management Evaluations, which is within the DOE Office of Health, Safety and Security (HSS). The review was performed

  20. Independent Oversight Review, Livermore Site Office - October 2011 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Livermore Site Office - October 2011 Independent Oversight Review, Livermore Site Office - October 2011 October 2011 Review of Integrated Safety Management System Effectiveness at the Livermore Site Office This report provides the results of an independent oversight review of the effectiveness of the integrated safety management system at the Department of Energy's (DOE) Livermore Site Office. The review was conducted July 11-21, 2011, by the Office of Safety and

  1. Independent Oversight Review, Nevada National Security Site, December 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy National Security Site, December 2013 Independent Oversight Review, Nevada National Security Site, December 2013 December 2013 Targeted Review of the Safety Significant Blast Door and Special Door Interlock Systems and Review of Federal Assurance Capability at the Nevada National Security Site This report documents the results of an independent oversight review of safety significant Blast Door Interlock and Special Door Interlock systems at the Nevada National Security

  2. Independent Oversight Review, Savannah River Operations Office - July 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Operations Office - July 2013 Independent Oversight Review, Savannah River Operations Office - July 2013 July 2013 Review of the Employee Concerns Program at the Savannah River Operations Office The purpose of this Independent Oversight targeted review was to evaluate DOE-SR processes and their implementation for addressing safety concerns reported by DOE, contractor, and subcontractor employees at the Savannah River Site (SRS). This targeted review was performed at

  3. Independent Oversight Review, Waste Treatment and Immobilization Plant -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 2012 | Department of Energy August 2012 Independent Oversight Review, Waste Treatment and Immobilization Plant - August 2012 August 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant Construction Quality This report documents the results of an independent oversight review of Construction Quality at the Hanford Site Waste Treatment and Immobilization Plant (WTP). The review was performed February 6-10, 2012, and April 30 - May 4, 2012, by the U.S. Department of

  4. Independent Oversight Review, Waste Treatment and Immobilization Plant -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 2012 | Department of Energy March 2012 Independent Oversight Review, Waste Treatment and Immobilization Plant - March 2012 March 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant Project Construction Quality This report documents the results of an independent oversight review of Construction Quality at the Hanford Site Waste Treatment and Immobilization Plant (WTP). The review was performed November 14-17, 2011, by the U.S. Department of Energy's (DOE) Office of

  5. Independent Oversight Review, Waste Treatment and Immobilization Plant -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    October 2012 | Department of Energy October 2012 Independent Oversight Review, Waste Treatment and Immobilization Plant - October 2012 October 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant Construction Quality This report documents the results of an independent review of selected aspects of construction quality at the Department of Energy's (DOE) Hanford Site Waste Treatment and Immobilization Plant. The review was conducted August 6-10, 2012, by the DOE Office of

  6. Independent Oversight Special Review, Department of Energy sites - February

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2008 | Department of Energy Department of Energy sites - February 2008 Independent Oversight Special Review, Department of Energy sites - February 2008 February 2008 Independent Oversight Special Review of Workplace Exposure Monitoring This report provides the results of a Special Review of Construction Safety and Health Programs at Department of Energy (DOE) sites. This special review is based on data collected from late 2005 to early 2008 during scheduled inspections performed by the DOE

  7. Independent Oversight Special Review, Rocky Flats Closure Project Site -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 2001 | Department of Energy Rocky Flats Closure Project Site - April 2001 Independent Oversight Special Review, Rocky Flats Closure Project Site - April 2001 April 2001 Special Review of the Rocky Flats Closure Project Site This report provides the results of a Special Review at the Rocky Flats Closure Project that was performed U.S. Department of Energy's (DOE) Office of Independent Environment, Safety, and Health Oversight. The Special Review was conducted in February and March 2001

  8. Independent Oversight Follow-up Review, Savannah River National Laboratory

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - January 2012 | Department of Energy Savannah River National Laboratory - January 2012 Independent Oversight Follow-up Review, Savannah River National Laboratory - January 2012 January 2012 Follow-up Review of Implementation Verification Reviews at the Savannah River National Laboratory Savannah River Site This report provides the results of an independent review of the identification and implementation of safety basis hazard controls associated with "flashing spray release"

  9. Independent Oversight Review, Argonne National Laboratory - November...

    Broader source: Energy.gov (indexed) [DOE]

    Office of Health, Safety and Security. The review was carried out within the broader context of an ongoing program of assessments of the execution of implementation verification...

  10. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This report discusses the scope, background, methodology, results, and conclusions of the review, as well as opportunities for improvement and items identified for further ...

  11. Independent Oversight Review, Lawrence Livermore National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lawrence Livermore National Laboratory - September 2013 September 2013 Review of the Fire Protection Program at Lawrence Livermore National Laboratory This report documents the...

  12. Independent Oversight Review, Pacific Northwest National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pacific Northwest National Laboratory - September 2013 September 2013 Review of the Fire Protection Program at Pacific Northwest National Laboratory and the Fire Suppression...

  13. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    December 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant Low Activity Waste Melter Process System Hazards Analysis Activity The Office of Enforcement and...

  14. Independent Oversight Review, Idaho National Laboratory - July...

    Energy Savers [EERE]

    of Health, Safety and Security. The review evaluated the site's processes for identifying emergency response capabilities and maintaining them in a state of readiness in the event...

  15. Independent Oversight Review, Hanford Site - September 2013 ...

    Energy Savers [EERE]

    Management Evaluations performed this review to evaluate the processes for identifying emergency response capabilities and maintaining them in a state of readiness in case of a...

  16. Independent Peer Review Program | Department of Energy

    Energy Savers [EERE]

    Peer Review Program PDF icon 2014 PERT Charter.pdf More Documents & Publications Hydropower Vision Task Force Charter Policy Flash 2013-65 Procurement Evaluation &...

  17. Independent Oversight Review, Waste Treatment and Immobilization...

    Broader source: Energy.gov (indexed) [DOE]

    Review of the Hanford Site Waste Treatment and Immobilization Plant Construction Quality ... construction quality at the Hanford Site Waste Treatment and Immobilization Plant (WTP). ...

  18. Independent Oversight Review, Lawrence Livermore National Laboratory...

    Broader source: Energy.gov (indexed) [DOE]

    Review of Preparedness for Severe Natural Phenomena Events at the Lawrence Livermore ... Nuclear Security Administration (NNSA) Livermore Field Office (LFO) and Lawrence ...

  19. Independent engineering review of the Hanford Waste Vitrification System

    SciTech Connect (OSTI)

    Not Available

    1991-10-01

    The Hanford Waste Vitrification Plant (HWVP) was initiated in June 1987. The HWVP is an essential element of the plan to end present interim storage practices for defense wastes and to provide for permanent disposal. The project start was justified, in part, on efficient technology and design information transfer from the prototype Defense Waste Processing Facility (DWPF). Development of other serial Hanford Waste Vitrification System (HWVS) elements, such as the waste retrieval system for the double-shell tanks (DSTs), and the pretreatment system to reduce the waste volume converted into glass, also was required to accomplish permanent waste disposal. In July 1991, at the time of this review, the HWVP was in the Title 2 design phase. The objective of this technical assessment is to determine whether the status of the technology development and engineering practice is sufficient to provide reasonable assurance that the HWVP and the balance of the HWVS system will operate in an efficient and cost-effective manner. The criteria used to facilitate a judgment of potential successful operation are: vitrification of high-level radioactive waste from specified DSTs on a reasonably continuous basis; and glass produced with physical and chemical properties formally acknowledge as being acceptable for disposal in a repository for high-level radioactive waste. The criteria were proposed specifically for the Independent Engineering Review to focus that assessment effort. They are not represented as the criteria by which the Department will judge the prudence of the Project. 78 refs., 10 figs., 12 tabs.

  20. Independent Oversight Review, Idaho Cleanup Project - August 2014 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Cleanup Project - August 2014 Independent Oversight Review, Idaho Cleanup Project - August 2014 August 2014 The U.S. Department of Energy?s (DOE) Office of Environment, Safety and Health Assessments, within the DOE Office of Independent Enterprise Assessments (IEA) (formerly the Office of Health, Safety and Security), conducted an independent oversight review of the Integrated Waste Treatment facility contractor readiness assessment (C-RA) at the Idaho Site from January

  1. Independent Oversight Review, Los Alamos National Laboratory - April 2012 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Los Alamos National Laboratory - April 2012 Independent Oversight Review, Los Alamos National Laboratory - April 2012 April 2012 Review of the Emergency Response Organization at the Los Alamos National Laboratory This report provides the results of an independent review of the Los Alamos National Laboratory emergency response organization program that was conducted February 7-9, 2012, by the Office of Safety and Emergency Management Evaluations within the Department of

  2. Independent Oversight Review, Los Alamos National Laboratory - September

    Office of Environmental Management (EM)

    Department of Energy May 2012 Independent Oversight Review, Los Alamos National Laboratory - May 2012 May 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Los Alamos National Laboratory his report provides the results of an independent review of the Los Alamos National Laboratory's preparedness for severe natural phenomena events that was conducted by the U.S. Department of Energy's Office of Health, Safety and Security (HSS) in March 2012. The HSS Office of Safety

  3. Independent Oversight Review, Los Alamos National Laboratory Chemistry and

    Office of Environmental Management (EM)

    Metallurgy Research Facility - January 2012 | Department of Energy Laboratory Chemistry and Metallurgy Research Facility - January 2012 Independent Oversight Review, Los Alamos National Laboratory Chemistry and Metallurgy Research Facility - January 2012 January 2012 Review of the Los Alamos National Laboratory Chemistry and Metallurgy Research Facility Fire Suppression Vital Safety System This report provides the results of an independent review of the Los Alamos National Laboratory's

  4. Independent Oversight Review, Los Alamos Field Office - March 2014 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Field Office - March 2014 Independent Oversight Review, Los Alamos Field Office - March 2014 March 2014 Review of the Los Alamos Field Office Processes for Laboratory Oversight of Radiological Controls Activity-Level Implementation This report documents the results of an independent oversight review of National Nuclear Security Administration Los Alamos Field Office processes for laboratory oversight of radiological protection program activity-level implementation by Los

  5. Independent Oversight Review, Los Alamos National Laboratory - November

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2013 | Department of Energy National Laboratory - November 2013 Independent Oversight Review, Los Alamos National Laboratory - November 2013 November 2013 Review of the Los Alamos National Laboratory Radiological Controls Activity-Level Implementation This report documents the results of an independent oversight review of radiological protection program activity-level implementation performed by Los Alamos National Security and its subcontractors at Los Alamos National Laboratory, Los Alamos

  6. Independent Oversight Review, Los Alamos National Laboratory - April 2012 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy April 2012 Independent Oversight Review, Los Alamos National Laboratory - April 2012 April 2012 Review of the Consequence Assessment Program at the Los Alamos National Laboratory This report provides the results of an independent review of the Los Alamos National Laboratory emergency management consequence assessment program that was conducted February 7-9, 2012, by the Office of Safety and Emergency Management Evaluations within the Department of Energy's (DOE) Office

  7. Independent Oversight Review, Los Alamos National Laboratory - January 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy January 2013 Independent Oversight Review, Los Alamos National Laboratory - January 2013 January 2013 Review of the Los Alamos National Laboratory Corrective Action Effectiveness Review The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), evaluated the Los Alamos Site Office (LASO) safety system oversight (SSO) assessment of Los Alamos National Laboratory's (LANL) corrective actions to address prior

  8. Independent Oversight Review, Los Alamos National Laboratory - May 2012 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy May 2012 Independent Oversight Review, Los Alamos National Laboratory - May 2012 May 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Los Alamos National Laboratory his report provides the results of an independent review of the Los Alamos National Laboratory's preparedness for severe natural phenomena events that was conducted by the U.S. Department of Energy's Office of Health, Safety and Security (HSS) in March 2012. The HSS Office of Safety

  9. Independent Oversight Review, Nevada Site Office - October 2011 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Site Office - October 2011 Independent Oversight Review, Nevada Site Office - October 2011 October 2011 Review of Nevada Site Office Criticality Safety Assessments at the Criticality Experiments Facility and Training Assembly for Criticality Safety and Appraisal of the Criticality Experiments Facility Startup Plan This report provides the results of an independent oversight review of criticality safety assessment activities conducted by the Department of Energy's (DOE)

  10. Independent Oversight Review, Oak Ridge Transuranic Waste Processing

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Center, September 2013 | Department of Energy Oak Ridge Transuranic Waste Processing Center, September 2013 Independent Oversight Review, Oak Ridge Transuranic Waste Processing Center, September 2013 September 2013 Review of Management of Safety Systems at the Oak Ridge Transuranic Waste Processing Center and Associated Feedback and Improvement Processes. This report documents the results of an independent oversight review of the management of safety significant structures, systems, and

  11. Independent Oversight Review, Rocky Flats Environmental Technology Site -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 2000 | Department of Energy Rocky Flats Environmental Technology Site - March 2000 Independent Oversight Review, Rocky Flats Environmental Technology Site - March 2000 March 2000 Review of the Rocky Flats Environmental Technology Site Transportation Emergency Management Program This report provides the results of an independent review of the Transportation Emergency Management Program at the Department of Energy's Rocky Flats Environmental Technology Site that was conducted by the

  12. Independent Oversight Review, Waste Treatment and Immobilization Plant

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project - October 2010 | Department of Energy Project - October 2010 Independent Oversight Review, Waste Treatment and Immobilization Plant Project - October 2010 October 2010 Review of Nuclear Safety Culture at the Hanford Site Waste Treatment and Immobilization Plant Project The U.S. Department of Energy (DOE) Office of Health, Safety and Security (HSS) conducted an independent review of the nuclear safety culture at the Waste Treatment and Immobilization Plant (WTP) project at the Hanford

  13. A review of macroscopic ductile failure criteria. (Technical...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: A review of macroscopic ductile failure criteria. Citation Details In-Document Search Title: A review of macroscopic ductile failure criteria. The objective of ...

  14. Hydrogen Production Cost Estimate Using Biomass Gasification: Independent Review

    Office of Energy Efficiency and Renewable Energy (EERE)

    This independent review report assesses the 2009 state-of-the-art and 2020 projected capital cost, energy efficiency, and levelized cost for hydrogen production from biomass via gasification.

  15. Waste Treatment Plant External Independent Review, Office of...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 28, 2016 8:00AM EDT to April 1, 2016 5:00PM EDT External Independent Review (EIR). On March 28 - April 1, the Office of Project Management Oversight and Assessments (PM) will ...

  16. The independent review group`s comments on the MPC

    SciTech Connect (OSTI)

    Vincent, J.A.

    1994-10-01

    This article presents comments from the Group (IRG) who independently reviewed the multipurpose canister system (MCS) Conceptual Design Report. The IRG determined that its efforts would be best directed toward providing the DOE with recommendations concerning the MPC system design and development. Comments also focused on applying lessons learned during the CSDP review to the MPC design and procurement. Topics highlighted are the programmatic review and the MPC design review.

  17. External Independent Review (EIR) Scoping Meeting Agreement Form |

    Energy Savers [EERE]

    Department of Energy Scoping Meeting Agreement Form External Independent Review (EIR) Scoping Meeting Agreement Form Under DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, the Office of Acquisition and Project Management (OAPM) must perform a Performance Baseline External Independent Review (EIR) prior to Critical Decision (CD) 2, and a Construction/Execution Readiness EIR for all Major System projects prior to CD-3. The EIR Standard Operating Procedures

  18. External Independent Review (EIR) Standard Operating Procedure (SOP) May

    Energy Savers [EERE]

    2016 | Department of Energy Standard Operating Procedure (SOP) May 2016 External Independent Review (EIR) Standard Operating Procedure (SOP) May 2016 The Office of Project Management Oversight and Assessments (PM) performs External Independent Reviews (EIRs) to provide Project Management Executives (PMEs), senior leaders within the Department of Energy (DOE), and Congress an unbiased assessment of whether a capital asset project can be executed within proposed scope, schedule and cost

  19. Savannah River Site - Salt Waste Processing Facility Independent...

    Office of Environmental Management (EM)

    SALT WASTE PROCESSING FACILITY INDEPENDENT TECHNICAL REVIEW November 22, 2006 Conducted ... Leader SPD-SWPF-217 SPD-SWPF-217: Salt Waste Processing Facility Independent Technical ...

  20. Independent Oversight Inspection of Environment, Safety, and Health Programs at the Sandia National Laboratories, Technical Appendices, Volume II, May 2005

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) Office of Independent Oversight and Performance Assurance (OA) inspected environment, safety, and health (ES&H) programs at DOE Sandia National Laboratories (SNL) during March and April 2005. The inspection was performed by the OA Office of Environment, Safety and Health Evaluations. This volume of the report provides four technical appendices (C through F) containing detailed results of the OA review. Appendix C provides the results of the review of the application of the core functions of ISM for SNL work activities. Appendix D presents the results of the review of NNSA, SSO, and SNL feedback and continuous improvement processes and management systems. Appendix E presents the results of the review of essential safety system functionality, and Appendix F presents the results of the review of safety management of the selected focus areas.

  1. Independent Oversight Inspection of Environment, Safety, and Health Programs at the Argonne National Laboratory, Technical Appendices, Volume II, May 2005

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) Office of Independent Oversight and Performance Assurance (OA) inspected environment, safety, and health (ES&H) programs at the DOE Argonne National Laboratory (ANL) during April and May 2005. The inspection was performed by the OA Office of Environment, Safety and Health Evaluations. This volume of the report provides four technical appendices (C through F) containing detailed results of the OA review. Appendix C provides the results of the review of the application of the core functions of ISM for ANL work activities. Appendix D presents the results of the review of SC, ASO, and ANL feedback and continuous improvement processes and management systems. Appendix E presents the results of the review of essential safety system functionality, and Appendix F presents the results of the review of safety management of the selected focus areas.

  2. Independent Oversight Focused Review, Kansas City Plant, Summary Report -

    Energy Savers [EERE]

    Department of Energy Savannah River Remediation - July 2010 Independent Activity Report, Savannah River Remediation - July 2010 July 2010 Savannah River Operations Office Integrated Safety Management System Phase II Verification Review of Savannah River Remediation The U.S. Department of Energy (DOE), Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), participated in the DOE Savannah River Operations Office (DOE-SR), Office of Safety and Quality

  3. Technical Assistance: Increasing Code Compliance - 2014 BTO Peer Review |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Assistance: Increasing Code Compliance - 2014 BTO Peer Review Technical Assistance: Increasing Code Compliance - 2014 BTO Peer Review Presenter: Rosemarie Bartlett, Pacific Northwest National Laboratory View the Presentation Technical Assistance: Increasing Code Compliance - 2014 BTO Peer Review (1.08 MB) More Documents & Publications PNNL: Codes Portfolio - 2015 Peer Review Building Energy Codes Program - 2014 BTO Peer Review Building Energy Codes Program Overview -

  4. Independent Oversight Special Review, Bechtel Jacobs Company, LLC - July

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2011 | Department of Energy Bechtel Jacobs Company, LLC - July 2011 Independent Oversight Special Review, Bechtel Jacobs Company, LLC - July 2011 July 2011 Special Review of the Suspect/Counterfeit Items Program at the Bechtel Jacobs Company, LLC at the Oak Ridge Reservation This report provides the results of a special review of the of the Bechtel Jacobs Company, LLC (BJC) suspect/counterfeit items (S/CI) management system. This review was requested by the Manager of the U.S. Department of

  5. 2013 Geothermal Technologies Office Peer Review Technical Report...

    Broader source: Energy.gov (indexed) [DOE]

    Aid in Optimizing Water Use in Geothermal Applications 2013 Geothermal Technologies Office Peer Review Technical Report Energy Department Honored for Inroads in Geothermal Energy

  6. External Technical Review Report for Small Column Ion Exchange...

    Office of Environmental Management (EM)

    Report for Small Column Ion Exchange Technology at Savannah River Site External Technical Review Report for Small Column Ion Exchange Technology at Savannah River Site Full ...

  7. Wind Plant Optimization: SWiFT Restart Technical Review Committee

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plant Optimization: SWiFT Restart Technical Review Committee - Sandia Energy Energy Search ... Twitter Google + Vimeo Newsletter Signup SlideShare Wind Plant Optimization: SWiFT Restart ...

  8. External Technical Review for Evaluation of System Level Modeling...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of System Level Modeling and Simulation Tools in Support of Hanford Site Liquid Waste Process External Technical Review for Evaluation of System Level Modeling and...

  9. Objective and independent review system for SRP (Savannah River Plant) nonreactor facilities

    SciTech Connect (OSTI)

    Durant, W.S.

    1986-01-29

    The review system described in DPW-83-112 effectively provides objective and independent review for operation of SRP non-reactor nuclear facilities. Safe operation is ensured by trained personnel; an extensive system of Operational Safety Requirements, Technical Standards, written procedures and safety documents; incident investigation and reporting; and internal auditing. Implementation of DOE Order 5480.1A, Chapter V will be completed with issue of Operational Safety Requirements for all the non-reactor designated facilities in March 1986. 6 refs., 1 fig.

  10. Independent Oversight Review, Pantex Site Office - June 2012 | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Site Office - June 2012 Independent Oversight Review, Pantex Site Office - June 2012 June 2012 Review of the Pantex Site Office's Compliance with DOE Order 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities eview of the Pantex Site Office's (PXSO) compliance with DOE Order 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities. The review was performed onsite from April 2 to 5 and off site through April 24, 2012, by the U.S. Department

  11. Independent Oversight Review of the Technical Area 55 Safety...

    Office of Environmental Management (EM)

    ... policy and requirements, and the effectiveness of DOE and contractor line management performance in safety and security and other critical functions, as directed by the Secretary. ...

  12. Independent Technical Review of the X-740 Groundwater Remedy...

    Office of Scientific and Technical Information (OSTI)

    by slow release of TCE from the clay of the overlying Minford formation, from the sandstone of the underlying Berea formation, and from clayey layers within the Gallia itself. ...

  13. 2013 Geothermal Technologies Office Peer Review Technical Report |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 2013 Geothermal Technologies Office Peer Review Technical Report 2013 Geothermal Technologies Office Peer Review Technical Report March 5, 2014 - 12:00am Addthis Foro Energy, Inc. partners with the United States Department of Energy to commercialize high power lasers for the oil, natural gas, geothermal, and mining industries. photo courtesy of Foro Energy Foro Energy, Inc. partners with the United States Department of Energy to commercialize high power lasers for the

  14. Technical Workshop: Annual Merit Review Lessons Learned on Alternative

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transportation Refueling Infrastructure | Department of Energy Annual Merit Review Lessons Learned on Alternative Transportation Refueling Infrastructure Technical Workshop: Annual Merit Review Lessons Learned on Alternative Transportation Refueling Infrastructure The Office of Energy Policy and Systems Analysis and the Office of Energy Efficiency and Renewable Energy connected the Department's policy and research functions in a June 20, 2014 technical workshop: AMR Lessons Learned on

  15. External Independent Review (EIR) Standard Operating Procedure (SOP) October 2015

    Broader source: Energy.gov [DOE]

    The Office of Project Management Oversight and Assessments (PMOA) performs External Independent Reviews (EIRs) to provide Project Management Executives (PMEs), senior leaders within the Department of Energy (DOE), and Congress with an unbiased assessment of whether a capital asset project can be executed within proposed scope, schedule and cost commitments, while also meeting its key performance parameters and ultimately fulfilling its associated mission need. The objectives of this EIR Standard Operating Procedures (SOP) document are to clarify EIR expectations and to facilitate EIR planning and execution by PMOA, its support contractors, DOE Program offices and project teams.

  16. External Independent Review (EIR) Standard Operating Procedure (SOP) April 2016

    Broader source: Energy.gov [DOE]

    The Office of Project Management Oversight and Assessments (PM) performs External Independent Reviews (EIRs) to provide Project Management Executives (PMEs), senior leaders within the Department of Energy (DOE), and Congress an unbiased assessment of whether a capital asset project can be executed within proposed scope, schedule and cost commitments, while also meeting its key performance parameters and fulfilling its associated mission need. The objectives of this EIR Standard Operating Procedure (SOP) document are to clarify EIR expectations and to facilitate EIR planning and execution by PM, its support contractors, DOE Program offices and project teams.

  17. Hydrogen Production Cost Estimate Using Biomass Gasification: Independent Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydrogen Production Cost Estimate Using Biomass Gasification National Renewable Energy Laboratory 1617 Cole Boulevard * Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Contract No. DE-AC36-08GO28308 Independent Review Published for the U.S. Department of Energy Hydrogen and Fuel Cells Program NREL/BK-6A10-51726 October

  18. Review of the independent risk assessment of the proposed Cabrillo liquified natural gas deepwater port project.

    SciTech Connect (OSTI)

    Gritzo, Louis Alan; Hightower, Marion Michael; Covan, John Morgan; Luketa-Hanlin, Anay Josephine

    2006-01-01

    In March 2005, the United States Coast Guard requested that Sandia National Laboratories provide a technical review and evaluation of the appropriateness and completeness of models, assumptions, analyses, and risk management options presented in the Cabrillo Port LNG Deepwater Port Independent Risk Assessment-Revision 1 (Cabrillo Port IRA). The goal of Sandia's technical evaluation of the Cabrillo Port IRA was to assist the Coast Guard in ensuring that the hazards to the public and property from a potential LNG spill during transfer, storage, and regasification operations were appropriately evaluated and estimated. Sandia was asked to review and evaluate the Cabrillo Port IRA results relative to the risk and safety analysis framework developed in the recent Sandia report, ''Guidance on Risk Analysis and Safety Implications of a Large Liquefied Natural Gas (LNG) Spill over Water''. That report provides a framework for assessing hazards and identifying approaches to minimize the consequences to people and property from an LNG spill over water. This report summarizes the results of the Sandia review of the Cabrillo Port IRA and supporting analyses. Based on our initial review, additional threat and hazard analyses, consequence modeling, and process safety considerations were suggested. The additional analyses recommended were conducted by the Cabrillo Port IRA authors in cooperation with Sandia and a technical review panel composed of representatives from the Coast Guard and the California State Lands Commission. The results from the additional analyses improved the understanding and confidence in the potential hazards and consequences to people and property from the proposed Cabrillo Port LNG Deepwater Port Project. The results of the Sandia review, the additional analyses and evaluations conducted, and the resolutions of suggested changes for inclusion in a final Cabrillo Port IRA are summarized in this report.

  19. Independent Oversight Inspection of Environment, Safety, and Health Programs at the Pantex Plant, Technical Appendices, Volume II, February 2005

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) programs at the DOE Pantex Plant during January and February 2005. The inspection was performed by the OA Office of Environment, Safety and Health Evaluations. OA reports to the Director of the Office of Security and Safety Performance Assurance, who reports directly to the Secretary of Energy. This volume of the report provides four technical appendices (C through F) containing detailed results of the OA review. Appendix C provides the results of the review of the application of the core functions of ISM for Pantex Plant work activities. Appendix D presents the results of the review of NNSA, PXSO, and BWXT feedback and continuous improvement processes and management systems. Appendix E presents the results of the review of essential safety system functionality, and Appendix F presents the results of the review of safety management of the selected focus areas.

  20. HFBR: Review of the technical specifications against the FSAR

    SciTech Connect (OSTI)

    Rao, D.V.; Ross, S.B.; Claiborne, E.R.; Darby, J.L.; Clark, R.A.

    1990-01-25

    The purpose of this review is to determine the adequacy of the High Flux Beam Reactor (HFBR) Technical Specifications for 40 MW operation by comparison with the HFBR Final Safety Analysis Report, particularly the accident analyses chapter. Specifically, the Technical Specifications were compared against the Design Basis Accident (DBA) Analyses presented in the Addendum to the HFBR FSAR for 60 MW Operation. The 60 MW DBA analyses was used since it is more current and complete than the analyses presented in the original FSAR which is considered obsolete. A listing of the required systems and equipment was made for each of the accidents analyzed. Additionally, the Technical Specification instrument setpoints were compared to the DBA analyses parametric values. Also included in this review was a comparison of the Technical Specification Bases against the FSAR and the identification of any differences. The HFBR Operations Procedures Manual (OPM) was also reviewed for any inconsistencies between the FSAR or the Technical Specifications. Upon completion of this review it was determined that the Technical Specifications are well written and the items commented on should not delay the low power restart (40 MW). Additionally, the OPM is also well written and does not require further modification before restart.

  1. 2008-10 "Independent Review of the MDA G CME Report by DOE Office...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 "Independent Review of the MDA G CME Report by DOE Office of Groundwater and Soil Remediation" 2008-10 "Independent Review of the MDA G CME Report by DOE Office of Groundwater and ...

  2. Lester to lead ORISE's scientific and technical peer review program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lester to lead ORISE's scientific and technical peer review program FOR IMMEDIATE RELEASE June 14, 2010 FY10-42 OAK RIDGE, Tenn.-Oak Ridge Associated Universities has appointed Tony Lester as director of the Oak Ridge Institute for Science and Education's program focused on scientific peer review. Lester has been serving in this role in an acting capacity since September 2009. Tony Lester Tony Lester In his role, Lester manages a research peer review capability that coordinates the use of

  3. Measurement of Hydrogen Production Rate Based on Dew Point Temperatures: Independent Review

    SciTech Connect (OSTI)

    Duffy, M.; Harrison, K.; Sheahen, T.

    2007-11-01

    This independent review verified Idaho National Labotory's approach of measuring the rate of hydrogen production using dew point temperatures.

  4. Current (2009) State-of-the-Art Hydrogen Production Cost Estimate Using Water Electrolysis: Independent Review

    SciTech Connect (OSTI)

    Not Available

    2009-09-01

    This independent review examines DOE cost targets for state-of-the art hydrogen production using water electrolysis.

  5. Independent Oversight Review, Oak Ridge National Laboratory- January 2013

    Broader source: Energy.gov [DOE]

    Review of the Oak Ridge National Laboratory High Flux Isotope Reactor Implementation Verification Review Processes

  6. Independent Oversight Review, DOE Nuclear Facilities- May 2013

    Broader source: Energy.gov [DOE]

    Lessons Learned from Targeted Reviews of Implementation Verification Review Processes at Department of Energy Nuclear Facilities

  7. RISK REDUCTION THROUGH USE OF EXTERNAL TECHNICAL REVIEWS, TECHNOLOGY READINESS ASSESSMENTS AND TECHNICAL RISK RATINGS - 9174

    SciTech Connect (OSTI)

    Cercy, M; Steven P Schneider, S; Kurt D Gerdes, K

    2008-12-12

    The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. A large majority of these wastes and facilities are 'one-of-a-kind' and unique to DOE. Many of the programs to treat these wastes have been 'first-of-a-kind' and unprecedented in scope and complexity. This has meant that many of the technologies needed to successfully disposition these wastes were not yet developed or required significant re-engineering to be adapted for DOE-EM's needs. The DOE-EM program believes strongly in reducing the technical risk of its projects and has initiated several efforts to reduce those risks: (1) Technology Readiness Assessments to reduce the risks of deployment of new technologies; (2) External Technical Reviews as one of several steps to ensure the timely resolution of engineering and technology issues; and (3) Technical Risk Ratings as a means to monitor and communicate information about technical risks. This paper will present examples of how Technology Readiness Assessments, External Technical Reviews, and Technical Risk Ratings are being used by DOE-EM to reduce technical risks.

  8. RISK REDUCTION THROUGH USE OF EXTERNAL TECHNICAL REVIEWS, TECHNOLOGY READINESS ASSESSMENTS AND TECHNICAL RISK RATINGS - 9174

    SciTech Connect (OSTI)

    Cercy, M; Steven P Schneider, S; Kurt D Gerdes, K

    2009-01-15

    The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. A large majority of these wastes and facilities are 'one-of-a-kind' and unique to DOE. Many of the programs to treat these wastes have been 'first-of-a-kind' and unprecedented in scope and complexity. This has meant that many of the technologies needed to successfully disposition these wastes were not yet developed or required significant re-engineering to be adapted for DOE-EM's needs. The DOE-EM program believes strongly in reducing the technical risk of its projects and has initiated several efforts to reduce those risks: (1) Technology Readiness Assessments to reduce the risks of deployment of new technologies; (2) External Technical Reviews as one of several steps to ensure the timely resolution of engineering and technology issues; and (3) Technical Risk Ratings as a means to monitor and communicate information about technical risks. This paper will present examples of how Technology Readiness Assessments, External Technical Reviews, and Technical Risk Ratings are being used by DOE-EM to reduce technical risks.

  9. TECHNICAL/PEER REVIEW RECORD FORM PS-3 Pressure System Number

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TECHNICAL/PEER REVIEW RECORD FORM PS-3 Pressure System Number Component(s) (if applicable) Design Authority (DA) DA Group/Division Note: Excluded Elements require a Peer Review. Peer Review must be completed by one or more DAs not associated with the project. Technical Review is applicable to code compliant components and can be performed by any DA. Type of Review (check) ____Technical Review ____Peer Review Description: Scope of Review: Applicable Code(s): The undersigned have reviewed the

  10. Independent Oversight Review, Argonne National Laboratory- November 2011

    Broader source: Energy.gov [DOE]

    Review of the Argonne National Laboratory Alpha-Gamma Hot Cell Facility Readiness Assessment (Implementation Verification Review Sections)

  11. Independent Oversight Review, Plutonium Finishing Plant- July 2014

    Office of Energy Efficiency and Renewable Energy (EERE)

    Targeted Review of the Safety Significant Confinement Ventilation System and Review of Federal Assurance Capability at the Plutonium Finishing Plant

  12. National laboratory technical exchanges with institutions and laboratories in the newly independent states of the former Soviet Union

    SciTech Connect (OSTI)

    Preszler, A.M.

    1994-07-01

    In March, 1992, the Department of Energy and the State Department established guidelines to encourage and direct laboratory-to-laboratory (lab-to-lab) cooperation with institutes in the newly independent states (NIS) of the former Soviet Union. As a nonproliferation effort, the cooperative activities focus on the need to prevent emigration of weapons scientists to potentially proliferant states and organizations. The objective is to encourage joint projects/contracts in non-weapons-related areas in order to provide meaningful work, commensurate with scientific capabilities, that will reduce economic pressures for emigration and assist in the development of a market economy. In addition, by encouraging Western science's philosophy of openness, peer reviews and publishing, the cooperative projects improve the transparency of weapons laboratories in the former Soviet Union. Technical collaborations are rapidly increasing in number and are fostering US industrial participation. Since the initial technical exchanges in October of 1992, lab-to-lab interactions resulted in more than 200 contracts, totaling more than $5 million, and involving more than 40 institutes in Russia, Ukraine, Kazakhstan and Belarus.

  13. Alcohol Fuels Program technical review, Spring 1984

    SciTech Connect (OSTI)

    Not Available

    1984-10-01

    The alcohol fuels program consists of in-house and subcontracted research for the conversion of lignocellulosic biomass into fuel alcohols via thermoconversion and bioconversion technologies. In the thermoconversion area, the SERI gasifier has been operated on a one-ton per day scale and produces a clean, medium-Btu gas that can be used to manufacture methanol with a relatively small gas-water shift reaction requirement. Recent research has produced catalysts that make methanol and a mixture of higher alcohols from the biomass-derived synthetic gas. Three hydrolysis processes have emerged as candidates for more focused research. They are: a high-temperature, dilute-acid, plug-flow approach based on the Dartmouth reactor; steam explosion pretreatment followed by hydrolysis using the RUT-C30 fungal organism; and direct microbial conversion of the cellulose to ethanol using bacteria in a single or mixed culture. Modeling studies, including parametric and sensitivity analyses, have recently been completed. The results of these studies will lead to a better definition of the present state-of-the-art for these processes and provide a framework for establishing the research and process engineering issues that still need resolution. In addition to these modeling studies, economic feasibility studies are being carried out by commercial engineering firms. Their results will supplement and add commercial validity to the program results. The feasibility contractors will provide input at two levels: Technical and economic assessment of the current state-of-the-art in alcohol production from lignocellulosic biomass via thermoconversion to produce methanol and higher alcohol mixtures and bioconversion to produce ethanol; and identification of research areas having the potential to significantly reduce the cost of production of alcohols.

  14. 2010 Neutron Review: ORNL Neutron Sciences Progress Report (Technical

    Office of Scientific and Technical Information (OSTI)

    Report) | SciTech Connect Technical Report: 2010 Neutron Review: ORNL Neutron Sciences Progress Report Citation Details In-Document Search Title: 2010 Neutron Review: ORNL Neutron Sciences Progress Report During 2010, the Neutron Sciences Directorate focused on producing world-class science, while supporting the needs of the scientific community. As the instrument, sample environment, and data analysis tools at High Flux Isotope Reactor (HFIR ) and Spallation Neutron Source (SNS) have grown

  15. Technical review of Molten Salt Oxidation

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    The process was reviewed for destruction of mixed low-level radioactive waste. Results: extensive development work and scaleup has been documented on coal gasification and hazardous waste which forms a strong experience base for this MSO process; it is clearly applicable to DOE wastes such as organic liquids and low-ash wastes. It also has potential for processing difficult-to-treat wastes such as nuclear grade graphite and TBP, and it may be suitable for other problem waste streams such as sodium metal. MSO operating systems may be constructed in relatively small units for small quantity generators. Public perceptions could be favorable if acceptable performance data are presented fairly; MSO will likely require compliance with regulations for incineration. Use of MSO for offgas treatment may be complicated by salt carryover. Figs, tabs, refs.

  16. The U.S. Nuclear Waste Technical Review Board Status Update

    Office of Environmental Management (EM)

    The U S Nuclear Waste Technical Review Board The U.S. Nuclear Waste Technical Review Board Status Update Presented to: National Transportation Stakeholders Forum Presented By: National Transportation Stakeholders Forum Mark Abkowitz May 11, 2011 The Board's Statutory Mandate * The 1987 amendments to the Nuclear Waste Policy Act (NWPA) established the U S Nuclear Waste Technical Review Board established the U.S. Nuclear Waste Technical Review Board. * The Board evaluates the technical and

  17. Independent Oversight Inspection of Environment, Safety, and Health Management at the Lawrence Livermore National Laboratory, Technical Appendices, Volume II, December 2004

    Office of Energy Efficiency and Renewable Energy (EERE)

    The U.S. Department of Energy (DOE) Office of Independent Oversight and Performance Assurance (OA), within the Office of Security and Safety Performance Assurance (SSA), conducted an inspection of environment, safety, and health (ES&H) at the DOE Lawrence Livermore National Laboratory (LLNL) during October and November 2004. The inspection was performed by the OA Office of Environment, Safety and Health Evaluations. Volume II of this report provides four technical appendices (C through F) containing detailed results of the OA review. Appendix C provides the results of the review of the application of the core functions of ISM for LLNL work activities. Appendix D presents the results of the review of NNSA, LSO, and contractor feedback and continuous improvement processes. Appendix E presents the results of the review of Plutonium Building essential safety system functionality, and Appendix F presents the results of the review of management of the selected focus areas.

  18. Independent Oversight Review, Hanford Waste Treatment and Immobilizati...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The scope of this quarterly assessment of construction quality review included observations of ongoing work activities, review of the Bechtel National, Inc. (BNI) corrective action ...

  19. Independent Oversight Review of Department of Energy Contractor...

    Broader source: Energy.gov (indexed) [DOE]

    The Department of Energy (DOE) Office of Oversight performed a two-phased review of eight Departmental contractor occupational medicine programs. The first phase of the review was ...

  20. Independent Oversight Review, Hanford Site CH2M Hill Plateau Remediation

    Office of Environmental Management (EM)

    Management Program - March 2014 | Department of Energy Review, Bonneville Power Administration Safety Management Program - March 2014 Independent Oversight Review, Bonneville Power Administration Safety Management Program - March 2014 March 2014 Oversight Review of the Bonneville Power Administration Safety Management Program Bonneville Power Administration management requested that the U.S. Department of Energy Office of Enforcement and Oversight (Independent Oversight), within the Office

  1. Independent Oversight Review, Savannah River Site Tritium Facilities...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independentreview of preparedness for severe ...

  2. Independent Oversight Follow-up Review of Activity Level Implementatio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Although the computer station is located within the posted contamination area, this is a ... were jointly witnessed by Independent Oversight and a DOE-ID MFC Facility Representative. ...

  3. Independent Oversight Activity Report for Review of Corrective...

    Office of Environmental Management (EM)

    of radiological posting and labeling, proper personal protective equipment doffing and contamination control, and response to abnormal operations. Result: Independent Oversight...

  4. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant – November 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of Preparedness for Severe Natural Phenomena Events at the Portsmouth Gaseous Diffusion Plant.

  5. Independent Specific Administrative Controls Review, Richland Operations Office- December 2010

    Broader source: Energy.gov [DOE]

    Specific Administrative Controls Review with the Office of Environmental Management at DOE-Richland Operations Office

  6. Independent Oversight Review, Hanford Tank Farms- November 2011

    Broader source: Energy.gov [DOE]

    Review of Hanford Tank Farms Safety Basis Amendment for Double-Shell Tank Ventilation System Upgrades

  7. Independent Oversight Review, Department of Energy Contractor- August 2000

    Broader source: Energy.gov [DOE]

    Review of Department of Energy Contractor Occupational Medicine Programs from December 1998 to June 1999

  8. Independent Oversight Review, Lawrence Livermore National Laboratory- August 2014

    Broader source: Energy.gov [DOE]

    Review of the Lawrence Livermore National Laboratory Radiological Controls Activity-Level Implementation.

  9. Independent Oversight Review, Idaho National Laboratory- September 2011

    Broader source: Energy.gov [DOE]

    Review of the Occupational Radiation Program as Implemented and Recently Enhanced at the Idaho National Laboratory

  10. Independent Oversight Review, Los Alamos National Laboratory- January 2012

    Broader source: Energy.gov [DOE]

    Review of the Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility Fire Suppression System

  11. Independent Oversight Review, Savannah River Site Tritium Facilities- December 2012

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of Site Preparedness for Severe Natural Phenomena Events at the Savannah River Site Tritium Facilities

  12. Independent Oversight Targeted Review, Sandia National Laboratories – November 2013

    Broader source: Energy.gov [DOE]

    Targeted Review of Activity-Level Implementation of Radiological Controls at Sandia National Laboratories

  13. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant- January 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of the Portsmouth Gaseous Diffusion Plant Work Planning and Control Activities Prior to Work Execution

  14. Independent Oversight Review, Savannah River Site- September 2012

    Broader source: Energy.gov [DOE]

    Review of the Savannah River Site, Salt Waste Processing Facility, Construction Quality of Piping & Pipe Supports

  15. Independent Oversight Review, Lawrence Livermore National Laboratory- September 2011

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of Integrated Safety Management System Effectiveness at Lawrence Livermore National Laboratory

  16. Independent Oversight Review, Hanford Site K-West Annex Facility - April

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2014 | Department of Energy K-West Annex Facility - April 2014 Independent Oversight Review, Hanford Site K-West Annex Facility - April 2014 April 2014 Review of the Hanford Site K-West Annex Facility Construction Quality The U.S. Department of Energy Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security, conducted an independent review of selected aspects of construction quality at the K-West Annex Facility. The onsite portion of the

  17. Independent Oversight Review, URS CH2M Oak Ridge - June 2013...

    Broader source: Energy.gov (indexed) [DOE]

    Oak Ridge Environmental Management Radiological Controls Activity Level Implementation The purpose of this set of facility specific Independent Oversight targeted reviews is to...

  18. Independent Oversight Focused Review, Kansas City Plant, Summary...

    Broader source: Energy.gov (indexed) [DOE]

    1 Focused Review of Environment, Safety and Health and Emergency Management at the Kansas City Plant This report provides a summary of the results of a focused review of the...

  19. Independent Oversight Review, Oak Ridge Office- August 2011

    Broader source: Energy.gov [DOE]

    Review of the Oak Ridge Office Oversight of the Fire Protection Program at the Oak Ridge Reservation

  20. Independent Oversight Review, Savannah River Site- August 2011

    Broader source: Energy.gov [DOE]

    Review of Commercial Grade Dedication Plans for the Safety Instrumented System at the Savannah River Site Waste Solidification Building Project

  1. Independent Oversight Review, Advanced Mixed Waste Treatment Project- April 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of Radiation Protection Program Implementation at the Advanced Mixed Waste Treatment Project of the Idaho Site

  2. Independent Oversight Review, Savannah River Site- July 2011

    Broader source: Energy.gov [DOE]

    Review of Electrical System Configuration Management and Design Change Control at the Savannah River Site, Waste Solidification Building Project

  3. Independent Oversight Review, Los Alamos National Laboratory- January 2013

    Broader source: Energy.gov [DOE]

    Review of the Los Alamos National Laboratory Weapons Engineering Tritium Facility Tritium Gas Containment Vital Safety System

  4. Independent Oversight Review, Waste Treatment and Immobilization Plant- December 2012

    Broader source: Energy.gov [DOE]

    Review of the Hanford Site Waste Treatment and Immobilization Plant Low Activity Waste Melter Process System Hazards Analysis Activity

  5. SUPPLEMENTAL COLUMBIA RIVER PROTECTION ACTIVITIES AT THE DEPARTMENT OF ENERGY HANFORD SITE: 2006 TECHNICAL PEER REVIEW

    SciTech Connect (OSTI)

    Looney, B; Dawn Kaback; Gene Leboeuf; Jason Mulvihill-Kuntz; Lynn Lefkoff

    2006-12-20

    Prompted by a $10 million Congressional allocation to identify supplemental actions to protect the Columbia River from groundwater contamination beneath the Hanford Reservation, the U. S. Department of Energy (DOE) Environmental Management (EM) Office of Clean-up Technology identified twenty-three potential technical projects and then down-selected ten of these for further evaluation. An independent expert peer review was conducted for the ten down-selected proposals. The review panel consisted of twenty-three recognized subject matter experts that broadly represented academia, industry, and federal laboratories. Of the initial ten proposals reviewed, one was given unconditional support, six were given conditional support, and three were not supported as proposed. Three additional proposals were then submitted by DOE for review--these proposals were structured, in part, to respond to the initial round of technical peer review comments. Peer reviews of these additional proposals provided conditional support. For those proposals that received conditional support, DOE requested specific implementation and work plans and assessed whether the plans adequately addressed the technical conditions identified by the review panel. The final list of technology proposals receiving support, or conditional support, primarily focused on understanding and reducing the potential impacts of uranium, chromium, and strontium from facilities adjacent to the Columbia River, with a secondary focus on understanding and limiting the future Columbia River impacts from the large carbon tetrachloride groundwater plume underlying and downgradient of the Hanford Central Plateau facilities. The results and recommendations of the peer reviews informed the final DOE project selections and supported implementation of the selected projects to protect the Columbia River and address groundwater contamination at Hanford.

  6. Independent Oversight Review, Savannah River Site- June 2012

    Broader source: Energy.gov [DOE]

    Review of Electrical System Configuration Management, Safety Instrumented System Commercial Grade Dedication, Setpoint Calculations, and Software Testing at the Savannah River Site, Waste Solidification Building Project

  7. Independent Oversight Targeted Review, Oak Ridge National Laboratory- April 2014

    Broader source: Energy.gov [DOE]

    Targeted Review of Radiological Controls Activity-Level Implementation at the Oak Ridge National Laboratory Radiochemical Engineering Development Center and High Flux Isotope Reactor Facilities

  8. Independent Oversight Review, DOE/NNSA Nuclear Facilities- April 2013

    Broader source: Energy.gov [DOE]

    Lessons Learned from the 2012 Targeted Reviews of Emergency Preparedness for Severe Natural Phenomena Events at Select DOE/NNSA Nuclear Facilities

  9. Independent Oversight Review, Pacific Northwest National Laboratory- October 2012

    Broader source: Energy.gov [DOE]

    Review of the Department of Energy Office of Science Assessment of the Pacific Northwest National Laboratory Radiochemical Processing Laboratory Criticality Alarm System

  10. Independent Oversight Review of the Hanford Site Waste Treatment...

    Energy Savers [EERE]

    ... BNI issued PIER Number 24590-WTP-PIER-MGT-12-1246-B, Rev. 0, Post Installed Anchor Bolt Installation and Documentation, to perform additional actions, including reviewing ...

  11. Independent Oversight Review, Oak Ridge Transuranic Waste Processing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ridge Transuranic Waste Processing Facility - December 2013 December 2013 Review of the Fire Protection Program and Fire Protection Systems at the Transuranic Waste Processing...

  12. Independent Oversight Review, Pacific Northwest National Laboratory- September 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of the Fire Protection Program at Pacific Northwest National Laboratory and the Fire Suppression System at the Radiochemical Processing Laboratory

  13. Independent Oversight Review, Y-12 National Security Complex...

    Office of Environmental Management (EM)

    - March 2014 March 2014 Review of the Uranium Processing Facility Project Design ... and configuration management program at the Uranium Processing Facility (UPF) project. ...

  14. Independent Oversight Review of the Lawrence Livermore National...

    Broader source: Energy.gov (indexed) [DOE]

    March 2001 Review of the Lawrence Livermore National Laboratory Health Services Department ... Division at the Department of Energy's (DOE) Lawrence Livermore National Laboratory. ...

  15. Documentation of Hanford Site independent review of the Hanford Waste Vitrification Plant Preliminary Safety Analysis Report

    SciTech Connect (OSTI)

    Herborn, D.I.

    1991-10-01

    The requirements for Westinghouse Hanford independent review of the Preliminary Safety Analysis Report (PSAR) are contained in Section 1.0, Subsection 4.3 of WCH-CM-4-46. Specifically, this manual requires the following: (1) Formal functional reviews of the HWVP PSAR by the future operating organization (HWVP Operations), and the independent review organizations (HWVP and Environmental Safety Assurance, Environmental Assurance, and Quality Assurance); and (2) Review and approval of the HWVP PSAR by the Tank Waste Disposal (TWD) Subcouncil of the Safety and Environmental Advisory Council (SEAC), which provides independent advice to the Westinghouse Hanford President and executives on matters of safety and environmental protection. 7 refs.

  16. Independent Oversight Review, Savannah River Field Office Tritium...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    work planning and control across U.S. Department of Energy sites that have hazard category 1, 2, and 3 facilities. The review was performed at the Savannah River Site from June ...

  17. Independent Oversight Follow-up Review, Hanford Site - February...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2013 February 2013 Follow-up Review of the Hanford Site Chronic Beryllium Disease Prevention Program The U.S. Department of Energy (DOE) Office of Enforcement and Oversight...

  18. Independent Oversight Follow-up Review, Hanford Site - January...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2014 January 2014 Follow-up Review of the Hanford Site Chronic Beryllium Disease Prevention Program The U.S. Department of Energy (DOE) Office of Enforcement and Oversight...

  19. Independent Review of Simulation of Net Infiltration for Present-Day and Potential Future Climates

    SciTech Connect (OSTI)

    Review Panel: Soroosh Sorooshian, Ph.D., Panel Chairperson, University of California, Irvine; Jan M. H. Hendrickx, Ph.D., New Mexico Institute of Mining and Technology; Binayak P. Mohanty, Ph.D., Texas A&M University; Scott W. Tyler, Ph.D., University of Nevada, Reno; Tian-Chyi Jim Yeh, Ph.D., University of Arizona -- ORISE Review Facilitators: Robert S. Turner, Ph.D., Technical Review Group Manager, Oak Ridge Institute for Science and Education; Brian R. Herndon, Project Manager, Oak Ridge Institute for Science and Education; Russ Manning, Technical Writer /Editor, Haselwood Enterprises, Inc.

    2008-08-30

    The DOE Office of Civilian Radioactive Waste Management (OCRWM) tasked Oak Ridge Institute for Science and Education (ORISE) with providing an independent expert review of the documented model and prediction results for net infiltration of water into the unsaturated zone at Yucca Mountain. The specific purpose of the model, as documented in the report MDL-NBS-HS-000023, Rev. 01, is “to provide a spatial representation, including epistemic and aleatory uncertainty, of the predicted mean annual net infiltration at the Yucca Mountain site ...” (p. 1-1) The expert review panel assembled by ORISE concluded that the model report does not provide a technically credible spatial representation of net infiltration at Yucca Mountain. Specifically, the ORISE Review Panel found that: • A critical lack of site-specific meteorological, surface, and subsurface information prevents verification of (i) the net infiltration estimates, (ii) the uncertainty estimates of parameters caused by their spatial variability, and (iii) the assumptions used by the modelers (ranges and distributions) for the characterization of parameters. The paucity of site-specific data used by the modeling team for model implementation and validation is a major deficiency in this effort. • The model does not incorporate at least one potentially important hydrologic process. Subsurface lateral flow is not accounted for by the model, and the assumption that the effect of subsurface lateral flow is negligible is not adequately justified. This issue is especially critical for the wetter climate periods. This omission may be one reason the model results appear to underestimate net infiltration beneath wash environments and therefore imprecisely represent the spatial variability of net infiltration. • While the model uses assumptions consistently, such as uniform soil depths and a constant vegetation rooting depth, such assumptions may not be appropriate for this net infiltration simulation because they

  20. Independent Review of the July 8, 2010 Fatality at the Strategic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    In consultation with the Assistant Secretary for Fossil Energy (FE), the Chief Health, Safety and Security Officer appointed an Independent Review Board (IRE3) on July 20,201 0, ...

  1. Independent Oversight Review of DOE Headquarters Emergency Response Plans and Performance, March 2003

    Broader source: Energy.gov [DOE]

    The Secretary of Energy’s Office of Independent Oversight and Performance Assurance (OA) conducted a review of emergency response plans and performance at DOE Headquarters (HQ) in February 2003.

  2. Waste Treatment Plant External Independent Review, Office of River Protection, Richland

    Broader source: Energy.gov [DOE]

    External Independent Review (EIR).  On March 28 - April 1, the Office of Project Management Oversight and Assessments (PM) will lead the site visit for the first phase of the WTP Baseline Change...

  3. Independent Review of the July 8, 2010 Fatality at the Strategic Petroleum

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reserve Bryan Mound Site - May 25, 2011 Addendum closing the Investigation based upon the Galveston County Medical Examiner's Report | Department of Energy Independent Review of the July 8, 2010 Fatality at the Strategic Petroleum Reserve Bryan Mound Site - May 25, 2011 Addendum closing the Investigation based upon the Galveston County Medical Examiner's Report Independent Review of the July 8, 2010 Fatality at the Strategic Petroleum Reserve Bryan Mound Site - May 25, 2011 Addendum closing

  4. Savannah River Site - Salt Waste Processing Facility Independent...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Savannah River Site - Salt Waste Processing Facility Independent Technical Review Full Document and Summary Versions are available for download PDF icon Savannah River Site - Salt ...

  5. ORISE: Scientific Peer Review Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Implementation of a sponsor's existing peer review protocols to evaluate the technical merit of each research proposal Design and management of an independent review program of ...

  6. Independent technical evaluation and recommendations for contaminated groundwater at the department of energy office of legacy management Riverton processing site

    SciTech Connect (OSTI)

    Looney, Brain B.; Denham, Miles E.; Eddy-Dilek, Carol A.

    2014-04-01

    The U.S. Department of Energy Office of Legacy Management (DOE-LM) manages the legacy contamination at the Riverton, WY, Processing Site – a former uranium milling site that operated from 1958 to 1963. The tailings and associated materials were removed in 1988-1989 and contaminants are currently flushing from the groundwater. DOE-LM commissioned an independent technical team to assess the status of the contaminant flushing, identify any issues or opportunities for DOE-LM, and provide key recommendations. The team applied a range of technical frameworks – spatial, temporal, hydrological and geochemical – in performing the evaluation. In each topic area, an in depth evaluation was performed using DOE-LM site data (e.g., chemical measurements in groundwater, surface water and soil, water levels, and historical records) along with information collected during the December 2013 site visit (e.g., plant type survey, geomorphology, and minerals that were observed, collected and evaluated).

  7. Enterprise Assessments Operational Awareness Record for the Review of the Technical Planning Basis at the Waste Isolation Pilot Plant (EA-WIPP-TPB-2016-04-05)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA Operational Awareness Record Report Number: EA-WIPP-TPB-2016-04-05 Site: Waste Isolation Pilot Plant Subject: Observation of Emergency Management Technical Planning Dates of Activity: 04/05/16 - 04/21/16 Report Preparer: Kurt Runge Activity Description/Purpose: The U.S. Department of Energy (DOE) Office of Emergency Management Assessments, within the independent Office of Enterprise Assessments (EA) reviewed portions of the technical planning basis for the Waste Isolation Pilot Plant (WIPP)

  8. DEVELOPMENT AND IMPLEMENTATION OF THE LOS ALAMOS NATIONAL LABORATORY INDEPENDENT SAR REVIEW PROCESS.

    SciTech Connect (OSTI)

    J. BUECK; T. MARTH

    2001-05-01

    Contractor independent review of contractor prepared safety documents has ceased as a requirement under DOE orders. However, a recent study to determine root causes of the poor quality and extremely long approval times for Los Alamos National Laboratory nuclear safety document has identified such a review as a crucial step in ensuring quality. LANL has teamed with the DOE Field Office to reinstate an independent review process modeled after DOE-STD-1104. A review guide has been prepared predicated on the content of DOE-STD-3009. Discipline has been enforced to ensure that comments reflect important issues and that resolution of the comment is possible. Safety management at both LANL and DOE have embraced this concept. This process has been exercised and has resulted in improvements in safety analysis quality and a degree of uniformity between DOE and LANL reviews.

  9. Independent design review report for truck {number_sign}1 modifications for flammable gas tanks

    SciTech Connect (OSTI)

    Wilson, G.W.

    1997-05-09

    The East and West Tank Farm Standing Order 97-01 requires that the PMST be modified to include purging of the enclosed space underneath the shielded receiver weather cover per National Fire Protection Association (NFPA) 496, Purged and Pressurized Enclosures for Electrical Equipment. The Standing Order also requires that the PMST be modified by replacing the existing electrical remote latch (RLU) unit with a mechanical remote latch unit. As the mechanical remote latch unit was exactly like the RLU installed on the Rotary Mode Core Sampler Trucks (RMCST) and the design for the RMCST went through formal design review, replacing the RLU was done utilizing informal design verification and was completed per work package ES-97-0028. As the weather cover purge was similar to the design for the RMCSTS, this design was reviewed using the independent review method with multiple independent reviewers. A function design criteria (WHC-SD-WM-FDC-048, Functional Design Criteria for Core Sampling in Flammable Gas Watch List Tanks) provided the criteria for the modifications. The review consisted of distributing the design review package to the reviewers and collecting and dispositioning the RCR comments. The review package included the ECNs for review, the Design Compliance Matrix, copies of all drawings affected, and copies of outstanding ECNs against these drawings. A final meeting was held to ensure that all reviewers were aware of the changes to ECNs from incorporation of RCR comments.

  10. A COMPREHENSIVE TECHNICAL REVIEW OF THE DEMONSTRATION BULK VITRIFICATION SYSTEM

    SciTech Connect (OSTI)

    SCHAUS, P.S.

    2006-09-29

    In May 2006, CH2M Hill Hanford Group, Inc. chartered an Expert Review Panel (ERP) to review the current status of the Demonstration Bulk Vitrification System (DBVS). It is the consensus of the ERP that bulk vitrification is a technology that requires further development and evaluation to determine its potential for meeting the Hanford waste stabilization mission. No fatal flaws (issues that would jeopardize the overall DBVS mission that cannot be mitigated) were found, given the current state of the project. However, a number of technical issues were found that could significantly affect the project's ability to meet its overall mission as stated in the project ''Justification of Mission Need'' document, if not satisfactorily resolved. The ERP recognizes that the project has changed from an accelerated schedule demonstration project to a formally chartered project that must be in full compliance with DOE 413.3 requirements. The perspective of the ERP presented herein, is measured against the formally chartered project as stated in the approved Justification of Mission Need document. A justification of Mission Need document was approved in July 2006 which defined the objectives for the DBVS Project. In this document, DOE concluded that bulk vitrification is a viable technology that requires additional development to determine its potential applicability to treatment of a portion of the Hanford low activity waste. The DBVS mission need statement now includes the following primary objectives: (1) process approximately 190,000 gallons of Tank S-109 waste into fifty 100 metric ton boxes of vitrified product; (2) store and dispose of these boxes at Hanford's Integrated Disposal Facility (IDF); (3) evaluate the waste form characteristics; (4) gather pilot plant operability data, and (5) develop the overall life cycle system performance of bulk vitrification and produce a comparison of the bulk vitrification process to building a second LAW Immobilization facility or other

  11. IMPLEMENTING THE NFPA 805 PROCESS: Observations of a Technical Reviewer

    SciTech Connect (OSTI)

    Short, Steven M.; Coles, Garill A.; Bohlander, Karl L.; Layton, Robert F.; Ivans, William J.; dePeralta, Fleurdeliza A.; Lowry, Peter P.

    2015-04-26

    In June 2004 the U.S. Nuclear Regulatory Commission (NRC) amended its fire protection requirements to permit existing nuclear power reactor licensees to voluntarily adopt fire protection requirements contained in National Fire Protection Association (NFPA) Standard 805. NFPA 805 is a performance-based standard for nuclear power plant fire protection that is an alternative to the deterministic, prescriptive fire protection requirements, such as 10 CFR 50 Appendix R, that was issued in 1980. One aspect of implementing NFPA 805 is that the licensee adopts the performance goals, objectives, and criteria for nuclear safety specified in the Standard. These goals, objectives, and criteria can be met through the implementation of deterministic approaches or performance-based approaches, including engineering analyses, probabilistic risk assessment, and fire modeling. Licensees voluntarily adopting the fire protection requirements in NFPA 805 must submit a license amendment request (LAR) to the NRC. The LAR provides the new proposed fire protection licensing basis, including the methodology and results of required evaluations and analyses that show how the NFPA 805 performance criteria are met. As of August 2014, licensees have submitted LARs for 26 nuclear power plants, representing 42 nuclear reactor units. Of these, 7 nuclear power plants, representing 10 nuclear reactor units, have been issued a safety evaluation (SE) by the NRC approving transition of their fire protection licensing basis to one that complies with NFPA 805. Pacific Northwest National Laboratory (PNNL) supports the NRC staff’s technical review of the LARs in the areas of fundamental fire protection, safe shutdown analysis, and Probabilistic Risk Assessment (PRA). PNNL, of course, cannot speak for the nuclear industry and its choice of implementation strategies or the NRC staff’s assessment of the approaches being taken to adopt NFPA 805. However, as a reviewer of the technical details of these

  12. 2013 Geothermal Technologies Office Peer Review Technical Report

    Broader source: Energy.gov [DOE]

    Provided in three sections, this comprehensive technical report assesses 100 projects in the GTO portfolio, based on presentations from GTO-funded principal investigators that were evaluated and...

  13. River Protection Project (RPP) Readiness to Proceed 2 Internal Independent Review Team Final Report

    SciTech Connect (OSTI)

    SCHAUS, P.S.

    2000-03-29

    This report describes the results of an independent review team brought in to assess CH2M Hill Hanford Group's readiness and ability to support the RPP's move into its next major phase - retrieval and delivery of tank waste to the Privatization Contractor

  14. River Protection Project (RPP) Readiness to Proceed 2 Internal Independent Review Team Final Report

    SciTech Connect (OSTI)

    SCHAUS, P.S.

    2000-03-15

    This report describes the results of an independent review team brought in to assess CH2M HILL Hanford's readiness and ability to support the RPP's move into its next major phase - retrieval and delivery of tank waste to the Privatization Contractor.

  15. Technical Standards

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Review for Technical Standards of Interest Legend: Red = Technical Standards Program Activities and Responsibilities Blue = Directives Program Activities and Responsibilities

  16. Independent Oversight Review of the Los Alamos National Laboratory Radiological Controls Activity-Level Implementation, November 2013

    Office of Environmental Management (EM)

    - March 2001 | Department of Energy Review of the Lawrence Livermore National Laboratory - March 2001 Independent Oversight Review of the Lawrence Livermore National Laboratory - March 2001 March 2001 Review of the Lawrence Livermore National Laboratory Health Services Department This report provides the results of an independent oversight review of the Health Services Division at the Department of Energy's (DOE) Lawrence Livermore National Laboratory. The review was performed March 19-21,

  17. INDEPENDENT TECHNICAL ASSESSMENT OF MANAGEMENT OF STORMWATER AND WASTEWATER AT THE SEPARATIONS PROCESS RESEARCH UNIT (SPRU) DISPOSITION PROJECT, NEW YORK

    SciTech Connect (OSTI)

    Abitz, R.; Jackson, D.; Eddy-Dilek, C.

    2011-06-27

    The U.S. Department of Energy (DOE) is currently evaluating the water management procedures at the Separations Process Research Unit (SPRU). The facility has three issues related to water management that require technical assistance: (1) due to a excessive rainfall event in October, 2010, contaminated water collected in basements of G2 and H2 buildings. As a result of this event, the contractor has had to collect and dispose of water offsite; (2) The failure of a sump pump at a KAPL outfall resulted in a Notice of Violation issued by the New York State Department of Environment and Conservation (NYSDEC) and subsequent Consent Order. On-site water now requires treatment and off-site disposition; and (3) stormwater infiltration has resulted in Strontium-90 levels discharged to the storm drains that exceed NR standards. The contractor has indicated that water management at SPRU requires major staff resources (at least 50 persons). The purpose of this review is to determine if the contractor's technical approach warrants the large number of staff resources and to ensure that the technical approach is compliant and in accordance with federal, state and NR requirements.

  18. Science and Technology Review March 2012 (Technical Report) ...

    Office of Scientific and Technical Information (OSTI)

    Science and Technology Review March 2012 Citation Details In-Document Search Title: Science and Technology Review March 2012 This month's issue has the following articles: (1) ...

  19. Review of hydrogen isotope permeability through materials (Technical...

    Office of Scientific and Technical Information (OSTI)

    Review of hydrogen isotope permeability through materials Citation Details In-Document Search Title: Review of hydrogen isotope permeability through materials You are accessing ...

  20. LITERATURE REVIEW OF BORIC ACID SOLUBILITY DATA (Technical Report...

    Office of Scientific and Technical Information (OSTI)

    LITERATURE REVIEW OF BORIC ACID SOLUBILITY DATA Citation Details In-Document Search Title: LITERATURE REVIEW OF BORIC ACID SOLUBILITY DATA You are accessing a document from the ...

  1. SCFA lead lab technical assistance review of the Pit 7 Complex source containment

    SciTech Connect (OSTI)

    Eaton, D.; Janeday, D.; Woodward, D.; Imrich, J.; Evans, J.; Morris, M.; Reimus, P.; Hazen, T.

    2001-01-29

    On January 29-30, 2001 a technical assistance team (TAT) met with the Pit 7 project team at Lawrence Livermore National Laboratory (LLNL) to review technologies being evaluated for remediation in the Site 300 Pit 7 Complex and the process for selecting these technologies. Specifically, the project team presented the TAT with a core need to identify technically and economically practicable technologies and methods to stabilize, contain, or control the tritium and uranium in the source areas at the Pits 3 and 5 landfill area to prevent further releases of these contaminants to groundwater and the migration of tritiated and uranium-contaminated groundwater. The approaches and needs for the systems surrounding the landfills were also presented and discussed. With encouragement from the project team, the TAT expanded its focus to include additional site characterization, a water balance model, and computational models. The TAT was comprised of leading technical and regulatory experts from around the country and was assembled by SCFA's Lead Lab in response to a technical assistance request from John Ziagos, Project Manager for the Pit 7 Area (Technical Assistance Request: LLNL No.1). A list of the TAT members is included below and contact information the TAT members and site participants is in Appendix B. To familiarize the TAT assistance team with Pit 7 Complex issues, the project team gave a presentation outlining the site geology, contaminant hydrogeology, land-use issues, stakeholder concerns, regulatory requirements, groundwater flow and transport modeling efforts, pit source characterization efforts, and remedial options. Time for clarification and questions between the TAT and the site team was integrated into the presentation schedule. On the morning of the second day, the TAT reconvened with the site team and John Evans of the TAT presented information about a helium soil gas survey method that could potentially be used to locate and characterize tritium hot

  2. 2008-10 "Independent Review of the MDA G CME Report by DOE Office of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Groundwater and Soil Remediation" | Department of Energy 0 "Independent Review of the MDA G CME Report by DOE Office of Groundwater and Soil Remediation" 2008-10 "Independent Review of the MDA G CME Report by DOE Office of Groundwater and Soil Remediation" The intent of this recommendation is to perform an independent and informed review of the MDA G CME which can be referenced by LANL in their discussions with NMED during the NMED acceptance review. This independent

  3. 1-10 kW Stationary Combined Heat and Power Systems Status and Technical

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Potential: Independent Review | Department of Energy -10 kW Stationary Combined Heat and Power Systems Status and Technical Potential: Independent Review 1-10 kW Stationary Combined Heat and Power Systems Status and Technical Potential: Independent Review This independent review examines the status and technical potential of 1-10 kW stationary combined heat and power fuel cell systems and analyzes the achievability of the DOE cost, efficiency, and durability targets for 2012, 2015, and 2020.

  4. Energy Department Announces New Technical Review to Assess Black...

    Broader source: Energy.gov (indexed) [DOE]

    ... He had first-hand knowledge of the first fatal nuclear accident in the United States (known as the SL-1 accident in Idaho). He led the technical team that responded to the Three ...

  5. Review of PREPA Technical Requirements for Interconnecting Wind and Solar Generation

    SciTech Connect (OSTI)

    Gevorgian, Vahan; Booth, Sarah

    2013-11-01

    The Puerto Rico Electric Power Authority developed the minimum technical requirements for interconnection of wind turbine generation and photovoltaic power plants. NREL has conducted a review of these requirements based on generic technical aspects and electrical characteristics of wind and photovoltaic power plants, and on existing requirements from other utilities (both U.S. and European).

  6. Vehicle Technologies Office Merit Review 2015: Technical Cost Modeling for Vehicle Lightweighting

    Broader source: Energy.gov [DOE]

    Presentation given by IBIS Associates at 2015 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about technical cost modeling for...

  7. Welding and nondestructive examination issues at Seabrook Nuclear Station: An independent review team report

    SciTech Connect (OSTI)

    Spessard, R.L.; Coley, J.; Crowley, W.; Walton, G.

    1990-07-01

    In response to congressional concerns about the adequacy of the welding and nondestructive examination (NDE) programs at the Seabrook Nuclear Station, NRC senior management established an independent review team (IRT) to conduct an assessment. The IRT focused on the quality of the finished hardware and associated records, as well as on the adequacy of the overall quality assurance program as applied to the fabrication and NDE programs for pipe welds. This report documents the findings of that investigation.

  8. Science and Technology Review, July/August 2012 (Technical Report...

    Office of Scientific and Technical Information (OSTI)

    Science and Technology Review, JulyAugust 2012 Citation Details In-Document Search Title: Science and Technology Review, JulyAugust 2012 You are accessing a document from the ...

  9. Peer Review of Allison Lo's Presentation By Alex Ramsey (Technical...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Peer Review of Allison Lo's Presentation By Alex Ramsey Citation Details In-Document Search Title: Peer Review of Allison Lo's Presentation By Alex Ramsey Mapping the metal uptake...

  10. Review of the Regional Biomass Energy Program: Technical projects

    SciTech Connect (OSTI)

    Lusk, P.

    1994-12-31

    This article summarizes technical projects of the regional Biomass Energy Program. Projects included are as follows: economic impact studies for renewable energy resources; alternative liquid fuels; Wood pellets fuels forum; residential fuel wood consumption; waste to energy decision-makers guide; fuel assessment for cogeneration facilities; municipal solid waste combustion characteristics.

  11. Science and Technology Review October/November 2011 (Technical...

    Office of Scientific and Technical Information (OSTI)

    November 2011 Citation Details In-Document Search Title: Science and Technology Review OctoberNovember 2011 You are accessing a document from the Department of Energy's...

  12. 2015 DOE Vehicle Technologies Office Annual Merit Review (Technical...

    Office of Scientific and Technical Information (OSTI)

    Title: 2015 DOE Vehicle Technologies Office Annual Merit Review The 2015 U.S. Department of Energy (DOE) Fuel Cell Technologies Office (FCTO) and Vehicle Technologies Office (VTO) ...

  13. Science and Technology Review, July/August 2012 (Technical Report...

    Office of Scientific and Technical Information (OSTI)

    Citation Details In-Document Search Title: Science and Technology Review, JulyAugust 2012 ... Up with the Times - The Laboratory's Education Assistance Program helps its workforce ...

  14. 2013-02 "Review Material Disposal Areas at LANL in Addition to Technical

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Area 54 for Risks Associated with Fires" | Department of Energy 2 "Review Material Disposal Areas at LANL in Addition to Technical Area 54 for Risks Associated with Fires" 2013-02 "Review Material Disposal Areas at LANL in Addition to Technical Area 54 for Risks Associated with Fires" The intent of this Recommendation 2013-02 is to ensure that the appropriate level of review has been given to MDAs other than MDA G at LANL that may be at similar risk in the event of

  15. Independent technical support for the frozen soil barrier installation and operation at the Fukushima Daiichi Nuclear Power Station (F1 Site)

    SciTech Connect (OSTI)

    Looney, Brian B.; Jackson, Dennis G.; Truex, Michael J.; Johnson, Christian D.

    2015-02-23

    TEPCO is implementing a number of water countermeasures to limit the releases and impacts of contaminated water to the surrounding environment. The diverse countermeasures work together in an integrated manner to provide different types, and several levels, of protection. In general, the strategy represents a comprehensive example of a “defense in depth” concept that is used for nuclear facilities around the world. One of the key countermeasures is a frozen soil barrier encircling the damaged reactor facilities. The frozen barrier is intended to limit the flow of water into the area and provide TEPCO the ability to reduce the amount of contaminated water that requires treatment and storage. The National Laboratory team supports the selection of artificial ground freezing and the incorporation of the frozen soil barrier in the contaminated water countermeasures -- the technical characteristics of a frozen barrier are relatively well suited to the Fukushima-specific conditions and the need for inflow reduction. Further, our independent review generally supports the TEPCO/Kajima design, installation strategy and operation plan.

  16. Science and Technology Review March 2013 (Technical Report) ...

    Office of Scientific and Technical Information (OSTI)

    March 2013 Citation Details In-Document Search Title: Science and Technology Review March 2013 You are accessing a document from the Department of Energy's (DOE) SciTech...

  17. Science and Technology Review July/August 2011 (Technical Report...

    Office of Scientific and Technical Information (OSTI)

    JulyAugust 2011 Citation Details In-Document Search Title: Science and Technology Review JulyAugust 2011 You are accessing a document from the Department of Energy's (DOE)...

  18. Science and Technology Review December 2012 (Technical Report...

    Office of Scientific and Technical Information (OSTI)

    December 2012 Citation Details In-Document Search Title: Science and Technology Review December 2012 You are accessing a document from the Department of Energy's (DOE) SciTech...

  19. Review and Approval of Nuclear Facility Safety Basis Documents (Documented Safety Analyses and Technical Safety Requirements)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE-STD-1104-96 November 2005 CHANGE NOTICE NO. 3 Date December 2005 DOE STANDARD REVIEW AND APPROVAL OF NUCLEAR FACILITY SAFETY BASIS DOCUMENTS (DOCUMENTED SAFETY ANALYSES AND TECHNICAL SAFETY REQUIREMENTS) U.S. Department of Energy AREA SAFT Washington, DC 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information

  20. Multi Canister Overpack (MCO) Handling Machine Independent Review of Seismic Structural Analysis

    SciTech Connect (OSTI)

    SWENSON, C.E.

    2000-09-22

    The following separate reports and correspondence pertains to the independent review of the seismic analysis. The original analysis was performed by GEC-Alsthom Engineering Systems Limited (GEC-ESL) under subcontract to Foster-Wheeler Environmental Corporation (FWEC) who was the prime integration contractor to the Spent Nuclear Fuel Project for the Multi-Canister Overpack (MCO) Handling Machine (MHM). The original analysis was performed to the Design Basis Earthquake (DBE) response spectra using 5% damping as required in specification, HNF-S-0468 for the 90% Design Report in June 1997. The independent review was performed by Fluor-Daniel (Irvine) under a separate task from their scope as Architect-Engineer of the Canister Storage Building (CSB) in 1997. The comments were issued in April 1998. Later in 1997, the response spectra of the Canister Storage Building (CSB) was revised according to a new soil-structure interaction analysis and accordingly revised the response spectra for the MHM and utilized 7% damping in accordance with American Society of Mechanical Engineers (ASME) NOG-1, ''Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder).'' The analysis was re-performed to check critical areas but because manufacturing was underway, designs were not altered unless necessary. FWEC responded to SNF Project correspondence on the review comments in two separate letters enclosed. The dispositions were reviewed and accepted. Attached are supplier source surveillance reports on the procedures and process by the engineering group performing the analysis and structural design. All calculation and analysis results are contained in the MHM Final Design Report which is part of the Vendor Information File 50100. Subsequent to the MHM supplier engineering analysis, there was a separate analyses for nuclear safety accident concerns that used the electronic input data files provided by FWEC/GEC-ESL and are contained in document SNF-6248

  1. Independent Oversight Activity Report for Review of Corrective Actions for Findings from the Independent Oversight Review of Los Alamos National Laboratory Radiological Controls Activity-Level Implementation - February 12, 2014

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    HSS Independent Activity Report - Rev. 0 Report Number: HIAR LANL-2014-02-12 Site: Los Alamos National Laboratory (LANL) Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for Review of Corrective Actions for Findings from the Independent Oversight Review of LANL Radiological Controls Activity-Level Implementation (Published November 2013) Dates of Activity : 02/12/2014 Report Preparer: Robert Freeman, Nuclear Engineer Activity

  2. A review of market monitoring activities at U.S. independent system operators

    SciTech Connect (OSTI)

    Lesieutre, Bernard C.; Goldman, Charles; Bartholomew, Emily

    2004-01-01

    Policymakers have increasingly recognized the structural impediments to effective competition in electricity markets, which has resulted in a renewed emphasis on the need for careful market design and market monitoring in wholesale and retail electricity markets. In this study, we review the market monitoring activities of four Independent System Operators in the United States, focusing on such topics as the organization of an independent market monitoring unit (MMU), the role and value of external market monitors, performance metrics and indices to aid in market analysis, issues associated with access to confidential market data, and market mitigation and investigation authority. There is consensus across the four ISOs that market monitoring must be organizationally independent from market participants and that ISOs should have authority to apply some degree of corrective actions on the market, though scope and implementation differ across the ISOs. Likewise, current practices regarding access to confidential market data by state energy regulators varies somewhat by ISO. Drawing on our interviews and research, we present five examples that illustrate the impact and potential contribution of ISO market monitoring activities to enhance functioning of wholesale electricity markets. We also discuss several key policy and implementation issues that Western state policymakers and regulators should consider as market monitoring activities evolve in the West.

  3. L1:PAC.P6.04 Westinghouse Test Stand Technical Readiness Review

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    L1:PAC.P6.04 Westinghouse Test Stand Technical Readiness Review Andrew Godfrey ORNL Completed: June 25, 2013 CASL-8-2013-01 -000 D Consortium for Advanced Simulation of LWRs Consortium for Advanced Simulation of Light Water Reactors Bldg. 5700, Room E309, MS 6003 P.O. Box 2008 Oak Ridge, TN 37831-6003 Email: casl-info@ornl.gov Date: 6/25/2013 To: Jess Gehin c: Erik Walker, Mark Baird, From: Andrew Godfrey Subject: Westinghouse Test Stand Technical Readiness Review Jess, I have completed a

  4. 2010 Solar Program Peer Review Report: An Independent Evaluation of Program Activities for FY2009 and FY2010

    SciTech Connect (OSTI)

    DOE Solar Energy Technologies Program

    2010-12-01

    This document summarizes the recommendations and evaluations provided by an independent external panel of experts at the DOE Solar Energy Technologies Program's 2010 Program Review meeting, held on May 24?27, 2010, in Washington, D.C.

  5. Savannah River Site- Tank 48 Briefing on SRS Tank 48 Independent Technical Review

    Broader source: Energy.gov [DOE]

    This presentation outlines the SRS Tank 48 ITR listing observations, conclusions, and TPB processing.

  6. Independent Review of AFC 2A, 2B, and 2E ATR Irradiation Tests

    SciTech Connect (OSTI)

    M. Cappiello; R. Hobbins; K. Penny; L. Walters

    2014-01-01

    As part of the Department of Energy Advanced Fuel Cycle program, a series of fuels development irradiation tests have been performed in the Advanced Test Reactor (ATR) at the Idaho National Laboratory. These tests are providing excellent data for advanced fuels development. The program is focused on the transmutation of higher actinides which best can be accomplished in a sodium-cooled fast reactor. Because a fast test reactor is no longer available in the US, a special test vehicle is used to achieve near-prototypic fast reactor conditions (neutron spectra and temperature) for use in ATR (a water-cooled thermal reactor). As part of the testing program, there were many successful tests of advanced fuels including metals and ceramics. Recently however, there have been three experimental campaigns using metal fuels that experienced failure during irradiation. At the request of the program, an independent review committee was convened to review the post-test analyses performed by the fuels development team, to assess the conclusions of the team for the cause of the failures, to assess the adequacy and completeness of the analyses, to identify issues that were missed, and to make recommendations for improvements in the design and operation of future tests. Although there is some difference of opinion, the review committee largely agreed with the conclusions of the fuel development team regarding the cause of the failures. For the most part, the analyses that support the conclusions are sufficient.

  7. Technical Review of the UNET2D Hydraulic Model

    SciTech Connect (OSTI)

    Perkins, William A.; Richmond, Marshall C.

    2009-05-18

    The Kansas City District of the US Army Corps of Engineers is engaged in a broad range of river management projects that require knowledge of spatially-varied hydraulic conditions such as velocities and water surface elevations. This information is needed to design new structures, improve existing operations, and assess aquatic habitat. Two-dimensional (2D) depth-averaged numerical hydraulic models are a common tool that can be used to provide velocity and depth information. Kansas City District is currently using a speci?c 2D model, UNET2D, that has been developed to meet the needs of their river engineering applications. This report documents a tech- nical review of UNET2D.

  8. Independent review of Oak Ridge HCTW test program and development of seismic evaluation criteria

    SciTech Connect (OSTI)

    1995-05-01

    Many of the existing buildings at the Oak Ridge Y-12 Plant are steel frame construction with unreinforced hollow clay tile infill walls (HCTW). The HCTW infill provides some lateral seismic resistance to the design/evaluation basis earthquake; however acceptance criteria for this construction must be developed. The basis for the development of seismic criteria is the Oak Ridge HCTW testing and analysis program and the target performance goals of DOE 5480.28 and DOE-STD-1020-94. This report documents and independent review of the testing and analysis program and development of recommended acceptance criteria for Oak Ridge HCTW construction. The HCTW test program included ``macro`` wall in-plane and out-of-plane tests, full-scale wall in-plane and out-of-plane tests, in-situ out-of-plane test, shake table tests, and masonry component tests.

  9. SAM Technical Review Committee Final Report: Summary and Key Recommendations from the Onsite TRC Meeting Held April 22-23, 2013

    SciTech Connect (OSTI)

    Blair, N.; Dobos, S.; Janzou, S.; Gilman, P.; Freeman, J.; Kaffine, L.

    2013-08-01

    The System Advisor Model (SAM) is a broad and robust set of models and frameworks for analyzing both system performance and system financing. It does this across a range of technologies dominated by solar technologies including photovoltaics (PV) and concentrated solar power (CSP). The U.S. Department of Energy (DOE) Solar Energy Technology Program requested the SAM development team to review the photovoltaic performance modeling with the development community and specifically, with the independent engineering community. The report summarizes the major effort for this technical review committee (TRC).

  10. Independent Oversight Review, Sodium Bearing Waste Treatment Project- Federal- June 2012

    Broader source: Energy.gov [DOE]

    Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Unit Federal Operational Readiness Review

  11. Independent Oversight Review, Sodium Bearing Waste Treatment Project- Contractor- June 2012

    Broader source: Energy.gov [DOE]

    Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Unit Contractor Operational Readiness Review

  12. PNL technical review of pressurized thermal-shock issues. [PWR

    SciTech Connect (OSTI)

    Pedersen, L.T.; Apley, W.J.; Bian, S.H.; Defferding, L.J.; Morgenstern, M.H.; Pelto, P.J.; Simonen, E.P.; Simonen, F.A.; Stevens, D.L.; Taylor, T.T.

    1982-07-01

    Pacific Northwest Laboratory (PNL) was asked to develop and recommend a regulatory position that the Nuclear Regulatory Commission (NRC) should adopt regarding the ability of reactor pressure vessels to withstand the effects of pressurized thermal shock (PTS). Licensees of eight pressurized water reactors provided NRC with estimates of remaining effective full power years before corrective actions would be required to prevent an unsafe operating condition. PNL reviewed these responses and the results of supporting research and concluded that none of the eight reactors would undergo vessel failure from a PTS event before several more years of operation. Operator actions, however, were often required to terminate a PTS event before it deteriorated to the point where failure could occur. Therefore, the near-term (less than one year) recommendation is to upgrade, on a site-specific basis, operational procedures, training, and control room instrumentation. Also, uniform criteria should be developed by NRC for use during future licensee analyses. Finally, it was recommended that NRC upgrade nondestructive inspection techniques used during vessel examinations and become more involved in the evaluation of annealing requirements.

  13. Application of Engineering and Technical Requirements for DOE Nuclear Facilities Standard Review Plan (SRP)

    Office of Energy Efficiency and Renewable Energy (EERE)

    This Standard Review Plan (SRP), Application of Engineering and Technical Requirements for DOE Nuclear Facilities, was developed by the Chief of Nuclear Safety (CNS)1, Office of the Under Secretary for Nuclear Security, to help strengthen the technical rigor of line management oversight and federal monitoring of DOE nuclear facilities. This SRP (hereafter refers to as the Engineering SRP) provides consistent review guidance to assure that engineering and technical requirements are appropriately applied for the design, operations and disposition2 of DOE nuclear facilities. It is one of a series of three SRPs developed by the CNS. The other two SRPs address: 1) nuclear safety basis program review; and 2) application of requirements of DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, and DOE-STD-1189, Integration of Safety into the Design Process, for DOE Critical Decision (CD) review and approval. These SRPs may be revised in the future to reflect changes in the DOE requirements, lessons learned, and experience/insights from nuclear facility design, operations, and disposition.

  14. Independent Oversight Review, Oak Ridge Office of Environmental Management- February 2012

    Broader source: Energy.gov [DOE]

    Review of the Implementation Verification Review Processes at the Oak Ridge Office of Environmental Management for Building 3019

  15. Technical Review of Retrieval and Closure Plans for the INEEL INTEC Tank Farm Facility

    SciTech Connect (OSTI)

    Bamberger, Judith A; Burks, Barry L; Quigley, Keith D; Falter, Diedre D

    2001-09-28

    The purpose of this report is to document the conclusions of a technical review of retrieval and closure plans for the Idaho National Energy and Environmental Laboratory (INEEL) Idaho Nuclear Technology and Engineering Center (INTEC) Tank Farm Facility. In addition to reviewing retrieval and closure plans for these tanks, the review process served as an information exchange mechanism so that staff in the INEEL High Level Waste (HLW) Program could become more familiar with retrieval and closure approaches that have been completed or are planned for underground storage tanks at the Oak Ridge National Laboratory (ORNL) and Hanford sites. This review focused not only on evaluation of the technical feasibility and appropriateness of the approach selected by INEEL but also on technology gaps that could be addressed through utilization of technologies or performance data available at other DOE sites and in the private sector. The reviewers, Judith Bamberger of Pacific Northwest National Laboratory (PNNL) and Dr. Barry Burks of The Providence Group Applied Technology, have extensive experience in the development and application of tank waste retrieval technologies for nuclear waste remediation.

  16. Independent Oversight Review of the Savannah River Field Office Tritium Facilities Radiological Controls Activity-Level Implementation, November 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Oversight Review of the Savannah River Field Office Tritium Facilities Radiological Controls Activity-Level Implementation May 2011 November 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose................................................................................................................................................ 1 2.0

  17. Support of enhanced oil recovery to independent producers in Texas. Quarterly technical progress report, July 1, 1995--September 30, 1995

    SciTech Connect (OSTI)

    Fotouh, K.H.

    1995-09-30

    The main objective of this project is to support independent oil producers in Texas and to improve the productivity of marginal wells utilizing enhanced oil recovery techniques. The main task carried out this quarter was the generation of an electronic data base.

  18. Independent Specific Administrative Controls Review, Office of River Protection- December 2010

    Broader source: Energy.gov [DOE]

    Specific Administrative Controls Review with the Office of Environmental Management at the Office of River Protection

  19. Independent Oversight Review, Y-12 National Security Complex – March 2014

    Broader source: Energy.gov [DOE]

    Review of the Uranium Processing Facility Project Design Requirements and Configuration Management Program

  20. Independent Oversight Review, Oak Ridge Transuranic Waste Processing Facility – December 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of the Fire Protection Program and Fire Protection Systems at the Transuranic Waste Processing Center

  1. Independent Oversight Review, Savannah River Site Salt Waste Processing Facility- August 2013

    Broader source: Energy.gov [DOE]

    Review of the Savannah River Site Salt Waste Processing Facility Safety Basis and Design Development.

  2. Independent Oversight Review, Savannah River Field Office Tritium Facilities – November 2013

    Broader source: Energy.gov [DOE]

    Review of Savannah River Field Office Tritium Facilities Radiological Controls Activity-Level Implementation

  3. Technical Review of Law Enforcement Standards and Guides Relative to Incident Management

    SciTech Connect (OSTI)

    Stenner, Robert D.; Salter, R.; Stanton, J. R.; Fisher, D.

    2009-03-24

    In an effort to locate potential law enforcement-related standards that support incident management, a team from the Pacific Northwest National Laboratory (PNNL) contacted representatives from the National Institute of Standards-Office of Law Enforcement Standards (NIST-OLES), National Institute of Justice (NIJ), Federal Bureau of Investigation (FBI), Secret Service, ASTM International committees that have a law enforcement focus, and a variety of individuals from local and regional law enforcement organizations. Discussions were held with various state and local law enforcement organizations. The NIJ has published several specific equipment-related law enforcement standards that were included in the review, but it appears that law enforcement program and process-type standards are developed principally by organizations that operate at the state and local level. Input is provided from state regulations and codes and from external non-government organizations (NGOs) that provide national standards. The standards that are adopted from external organizations or developed independently by state authorities are available for use by local law enforcement agencies on a voluntary basis. The extent to which they are used depends on the respective jurisdictions involved. In some instances, use of state and local disseminated standards is mandatory, but in most cases, use is voluntary. Usually, the extent to which these standards are used appears to depend on whether or not jurisdictions receive certification from a “governing” entity due to their use and compliance with the standards. In some cases, these certification-based standards are used in principal but without certification or other compliance monitoring. In general, these standards appear to be routinely used for qualification, selection for employment, and training. In these standards, the term “Peace Officer” is frequently used to refer to law enforcement personnel. This technical review of national law

  4. Technical Letter Report: Evaluation and Analysis of a Few International Periodic Safety Review Summary Reports

    SciTech Connect (OSTI)

    Chopra, Omesh K.; Diercks, Dwight R.; Ma, David Chia-Chiun; Garud, Yogendra S.

    2013-12-17

    and 1988. All of the reports reviewed were the regulator’s assessment of the PSR findings rather than the original PSR report, and all but one were English translations from the original language. In these reviews, it was found that most of the countries base their regulatory guidance to some extent (and often to a large extent) on U.S. design codes and standards, NRC regulatory guidance, and U.S. industry guidance. In addition, many of the observed operational technical issues and OpE events reported for U.S. reactors are also cited in the PSR reports. The PSR reports also identified a number of potential technical material/component performance issues and OpE events that are not commonly reported for U.S. plants.

  5. Independent Oversight Review, Nevada Site Office and National Security Technologies, LLC- November 2011

    Broader source: Energy.gov [DOE]

    Review of Nevada Site Office and National Security Technologies, LLC, Line Oversight and Contractor Assurance Systems Self-Assessment

  6. Independent Oversight Targeted Review, Y-12 National Security Complex- February 2012

    Broader source: Energy.gov [DOE]

    Targeted Review of Site Preparedness for Severe Natural Phenomena Events at the Y-12 National Security Complex

  7. Independent Oversight Review, Hanford Site Tank Farms 222-S Laboratory – January 2014

    Broader source: Energy.gov [DOE]

    Review of the Hanford Tank Farms Safety Management Program Implementation Electrical Safety in the 222-S Laboratory

  8. Independent Oversight Review, Hanford K Basin and Cold Vacuum Drying Facility- August 2012

    Broader source: Energy.gov [DOE]

    Review of Hanford K Basin and Cold Vacuum Drying Facility Found Fuel Multi-Canister Overpack Operations

  9. Independent review of design and analysis for Holtec spent fuel storage racks of CPP 666 Pool 1

    SciTech Connect (OSTI)

    Miller, G.K.

    1996-03-01

    This document summarizes the analyses and review performed to develop and validate the design of the new fuel storage racks for the Idaho Chemical Processing Plant (ICPP) Fuel Storage Area (FSA). Holtec International is responsible for the design and fabrication of the storage racks. This report describes the issues raised in the review effort and the resolutions to these issues. The conclusion is reached that the review issues for the racks of Pool 1 have been satisfactorily resolved in the final design and analysis for these racks. Section 1 of this report gives a brief description of the project. Section 2 describes the approach that Holtec used in analyzing the racks and results from these analyses. Section 3 describes the independent review process. Section 4 discusses the identification of and resolution to comments on the design analysis. Section 5 describes additional analysis performed to address major concerns with the Holtec design analysis. Section 6 presents a summary of AEC`s independent review, which is based on AEC`s final review report. Finally, Section 7 gives the Lockheed Idaho Technologies Company (LITCO) position on the acceptability of Holtec`s design.

  10. Advanced Mixed Waste Treatment Project melter system preliminary design technical review meeting

    SciTech Connect (OSTI)

    Eddy, T.L.; Raivo, B.D.; Soelberg, N.R.; Wiersholm, O.

    1995-02-01

    The Idaho National Engineering Laboratory Advanced Mixed Waste Treatment Project sponsored a plasma are melter technical design review meeting to evaluate high-temperature melter system configurations for processing heterogeneous alpha-contaminated low-level radioactive waste (ALLW). Thermal processing experts representing Department of Energy contractors, the Environmental Protection Agency, and private sector companies participated in the review. The participants discussed issues and evaluated alternative configurations for three areas of the melter system design: plasma torch melters and graphite arc melters, offgas treatment options, and overall system configuration considerations. The Technical Advisory Committee for the review concluded that graphite arc melters are preferred over plasma torch melters for processing ALLW. Initiating involvement of stakeholders was considered essential at this stage of the design. For the offgas treatment system, the advisory committee raised the question whether to a use wet-dry or a dry-wet system. The committee recommended that the waste stream characterization, feed preparation, and the control system are essential design tasks for the high-temperature melter treatment system. The participants strongly recommended that a complete melter treatment system be assembled to conduct tests with nonradioactive surrogate waste material. A nonradioactive test bed would allow for inexpensive design and operational changes prior to assembling a system for radioactive waste treatment operations.

  11. Energy Independence and Security Act Six-Year Review of Covered Products

    Broader source: Energy.gov [DOE]

    This memorandum explains that the Energy Independence and Security Act of 2007 (EISA) requires the Department of Energy to re-evaluate efficiency standards for all covered appliances and products...

  12. Independent Review of Pantex Plant Property and Material Clearance Processes September 8-12, 2008

    Office of Environmental Management (EM)

    Department of Energy Special Study, Department of Energy - August 2003 Independent Oversight Special Study, Department of Energy - August 2003 August 2003 Special Study of the Department of Energy's Management of Suspect/Counterfeit Items This report provides the results of a special study of the U.S. Department of Energy's (DOE) management of suspect/counterfeit items. The study was conducted from May through August 2003 by the DOE Office of Independent Oversight and Performance Assurance

  13. Active DOE Technical Standards Managers

    Office of Environmental Management (EM)

    TECHNICAL STANDARDS PROGRAM ASSIGNMENT TELEPHONEFAXEMAIL NAME DOE FACILITYADDRESS LOC ... Central Technical Authority Chief, Nuclear Safety Sta - CTACNS 1000 Independence ...

  14. Loads Providing Ancillary Services: Review of InternationalExperience-- Technical Appendix: Market Descriptions

    SciTech Connect (OSTI)

    Grayson Heffner, Charles Goldman, Kintner-Meyer, M; Kirby, Brendan

    2007-05-01

    In this study, we examine the arrangements for andexperiences of end-use loads providing ancillary services (AS) in fiveelectricity markets: Australia, the United Kingdom (UK), the Nordicmarket, and the ERCOT and PJM markets in the United States. Our objectivein undertaking this review of international experience was to identifyspecific approaches or market designs that have enabled customer loads toeffectively deliver various ancillary services (AS) products. We hopethat this report will contribute to the ongoing discussion in the U.S.and elsewhere regarding what institutional and technical developments areneeded to ensure that customer loads can meaningfully participate in allwholesale electricity markets.

  15. Review of the Savannah River Site Salt Waste Processing Facility...

    Office of Environmental Management (EM)

    Independent Oversight Review of the Savannah River Site Salt Waste Processing Facility ... and Component SWGR Switch Gear SWPF Salt Waste Processing Facility TSRs Technical Safety ...

  16. Independent review of estimated load reductions for PJM's small customer load response pilot project

    SciTech Connect (OSTI)

    Heffner, G.; Moezzi, M.; Goldman, C.

    2004-06-01

    This study describes the results of a low-cost approach used to measure reported load reductions from a residential electric water heater (EWH) load control program operated as part of PJM Interconnection's Demand Response small customer pilot program. Lawrence Berkeley National Laboratory (LBNL) conducted this independent review of the engineering estimates for EWH load control reported by a Curtailment Service Provider (CSP) at PJM's request. LBNL employed low-cost measurement and verification (M&V) approaches that utilized existing interval metering equipment to monitor results for a series of load control tests. The CSP collected hourly load data for two substations and several hundred households over a six-week period in October and November 2003. During this time period, the CSP operated its electric water heater load control program during pre-specified test periods in the morning, afternoon and early evening. LBNL then analyzed substation and premise-level data from these tests in order to verify the diversified demand reductions claimed by the CSP for customers participating in the EWH load control program. We found that the observed load reductions for the premise-level data aggregated over all households in the two participating electric cooperatives were, respectively, 40 percent-60 percent less and 3 percent less-10 percent higher than the estimated diversified demand reduction values assumed by the CSP, depending on whether observed or normalized results are considered. We also analyzed sub-station level data and found that the observed load reductions during the test periods were significantly lower than expected, although confounding influences and operational problems signifiogram during pre-specified test periods in the morning, afternoon and early evening. LBNL then analyzed substation and premise-level data from these tests in order to verify the diversified demand reductions claimed by the CSP for customers participating in the EWH load control

  17. Distributed Hydrogen Production from Natural Gas: Independent...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Production from Natural Gas: IndependentReview Panel Report Distributed Hydrogen Production from Natural Gas: Independent Review Panel Report Independent review report on the ...

  18. A Technical Review on Biomass Processing: Densification, Preprocessing, Modeling and Optimization

    SciTech Connect (OSTI)

    Jaya Shankar Tumuluru; Christopher T. Wright

    2010-06-01

    It is now a well-acclaimed fact that burning fossil fuels and deforestation are major contributors to climate change. Biomass from plants can serve as an alternative renewable and carbon-neutral raw material for the production of bioenergy. Low densities of 40–60 kg/m3 for lignocellulosic and 200–400 kg/m3 for woody biomass limits their application for energy purposes. Prior to use in energy applications these materials need to be densified. The densified biomass can have bulk densities over 10 times the raw material helping to significantly reduce technical limitations associated with storage, loading and transportation. Pelleting, briquetting, or extrusion processing are commonly used methods for densification. The aim of the present research is to develop a comprehensive review of biomass processing that includes densification, preprocessing, modeling and optimization. The specific objective include carrying out a technical review on (a) mechanisms of particle bonding during densification; (b) methods of densification including extrusion, briquetting, pelleting, and agglomeration; (c) effects of process and feedstock variables and biomass biochemical composition on the densification (d) effects of preprocessing such as grinding, preheating, steam explosion, and torrefaction on biomass quality and binding characteristics; (e) models for understanding the compression characteristics; and (f) procedures for response surface modeling and optimization.

  19. Human-system Interfaces to Automatic Systems: Review Guidance and Technical Basis

    SciTech Connect (OSTI)

    OHara, J.M.; Higgins, J.C.

    2010-01-31

    Automation has become ubiquitous in modern complex systems and commercial nuclear power plants are no exception. Beyond the control of plant functions and systems, automation is applied to a wide range of additional functions including monitoring and detection, situation assessment, response planning, response implementation, and interface management. Automation has become a 'team player' supporting plant personnel in nearly all aspects of plant operation. In light of the increasing use and importance of automation in new and future plants, guidance is needed to enable the NRC staff to conduct safety reviews of the human factors engineering (HFE) aspects of modern automation. The objective of the research described in this report was to develop guidance for reviewing the operator's interface with automation. We first developed a characterization of the important HFE aspects of automation based on how it is implemented in current systems. The characterization included five dimensions: Level of automation, function of automation, modes of automation, flexibility of allocation, and reliability of automation. Next, we reviewed literature pertaining to the effects of these aspects of automation on human performance and the design of human-system interfaces (HSIs) for automation. Then, we used the technical basis established by the literature to develop design review guidance. The guidance is divided into the following seven topics: Automation displays, interaction and control, automation modes, automation levels, adaptive automation, error tolerance and failure management, and HSI integration. In addition, we identified insights into the automaton design process, operator training, and operations.

  20. Vehicle Technologies Office Merit Review 2014: Central Texas Fuel Independence Project

    Broader source: Energy.gov [DOE]

    Presentation given by City of Austin at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about Central Texas Fuel...

  1. Documentation of Hanford Site independent review of the Hanford Waste Vitrification Plant Preliminary Safety Analysis Report

    SciTech Connect (OSTI)

    Herborn, D.I.

    1992-10-01

    This manual describes the overall WHC safety analysis process in terms of requirements for safety analyses, responsibilities of the various contributing organizations, and required reviews and approvals for the Hanford Waste Vitrification Plant.

  2. Independent Review of Siesmic Performance Assessments for the Plutonium Facility PF-4

    SciTech Connect (OSTI)

    Whittaker, Andrew; Goen, Lawrence Kenneth; Kennedy, Robert; McDonald, Brian; Morgan, Troy; Wyllie, Loring

    2015-11-25

    The Plutonium Facility, designated PF-4, is located in Technical Area 55 at the Los Alamos National Laboratory (LANL). The facility is a one-story rectangular structure above a complete basement; the building was constructed of cast-in-place reinforced concrete, with small interior frames of structural steel. The plan dimensions of the building are 265’×284’. The overall height of the building varies between 39’-0” at the north and south ends, and 40’-6” at the center ridge. The programmatic work performed in the building is vital to our national security and its functions and storage purposes are not replicated elsewhere in the United States Department of Energy (DOE).

  3. Independent Oversight Review of the Uranium Processing Facilkity Design Requirements and Configuration Management Program, March 2014

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oversight Review of the Uranium Processing Facility Design Requirements and Configuration Management Program March 2014 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................ 1 2.0 Background ...

  4. Technical Assessment of Cryo-Compressed Hydrogen Storage Tank...

    Broader source: Energy.gov (indexed) [DOE]

    The report includes an overview of technical progress to date, including the potential to meet DOE onboard storage targets, as well as independent reviews of system cost and energy ...

  5. Technical Review of the CENWP Computational Fluid Dynamics Model of the John Day Dam Forebay

    SciTech Connect (OSTI)

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.

    2010-12-01

    The US Army Corps of Engineers Portland District (CENWP) has developed a computational fluid dynamics (CFD) model of the John Day forebay on the Columbia River to aid in the development and design of alternatives to improve juvenile salmon passage at the John Day Project. At the request of CENWP, Pacific Northwest National Laboratory (PNNL) Hydrology Group has conducted a technical review of CENWP's CFD model run in CFD solver software, STAR-CD. PNNL has extensive experience developing and applying 3D CFD models run in STAR-CD for Columbia River hydroelectric projects. The John Day forebay model developed by CENWP is adequately configured and validated. The model is ready for use simulating forebay hydraulics for structural and operational alternatives. The approach and method are sound, however CENWP has identified some improvements that need to be made for future models and for modifications to this existing model.

  6. Technical guidance on the review and use of coal sampling and analysis (CSA) data

    SciTech Connect (OSTI)

    Paley, L.R.

    1985-10-01

    This document provides technical guidance to EPA's regional offices and State and local control agencies on the review and use of coal sampling and analysis (CSA) data in monitoring the compliance status of Subpart D boilers burning compliance coal and other large boilers which are not presently using SO/sub 2/ Continuous Emission Monitoring Systems (CEMS) nor submitting SO/sub 2/ Excess Emission Reports (EERs). The guidance is not applicable when the CSA method is specified as the emission compliance, alternative emission compliance, or sulfur-in-fuel compliance test method. The guideline describes specific forms and calculation methods to convert the source's coal sampling and analysis data into SO/sub 2/ EERs.

  7. Advanced Fast Reactor - 100 (AFR-100) Report for the Technical Review Panel

    SciTech Connect (OSTI)

    Grandy, Christopher; Sienicki, James J.; Moisseytsev, Anton; Krajtl, Lubomir; Farmer, Mitchell T.; Kim, Taek K.; Middleton, B.

    2014-06-04

    This report is written to provide an overview of the Advanced Fast Reactor-100 in the requested format for a DOE technical review panel. This report was prepared with information that is responsive to the DOE Request for Information, DE-SOL-0003674 Advanced Reactor Concepts, dated February 27, 2012 from DOE’s Office of Nuclear Energy, Office of Nuclear Reactor Technologies. The document consists of two main sections. The first section is a summary of the AFR-100 design including the innovations that are incorporated into the design. The second section contains a series of tables that respond to the various questions requested of the reactor design team from the subject DOE RFI.

  8. Report of the technical review team on the Catalytic Extraction Process

    SciTech Connect (OSTI)

    1996-03-01

    The TRT was impressed with the quality and volume of laboratory and pilot scale development work that had been conducted over the past year. Many of the doubts and questions raised by the TRP on technical details had been examined, either by theoretical calculations or in the pilot facility. Moreover, a more open and forthcoming attitude was evident among the MMT staff who either presented briefings or responded to the Team`s questions. Of special note to DOE, the TRP recognized a year ago that the pilot facility at Fall River was not designed for radioactive pilot tests. However, from the dialogue surrounding the TRP review, it was evident that not much thought had been given to the hazards, concerns, and special requirements incumbent with radioactive operations -- everything from doing pours of hot radioactive metal from a vessel to remote-handling equipment and operations. This year the TRT noticed a significant improvement in this respect.

  9. An independent review of the Multi-Path Redundant Avionics Suite (MPRAS) architecture assessment and characterization report

    SciTech Connect (OSTI)

    Johnson, M.R.

    1991-02-01

    In recent years the NASA Langley Research Center has funded several contractors to conduct conceptual designs defining architectures for fault tolerant computer systems. Such a system is referred to as a Multi-Path Redundant Avionics Suite (MPRAS), and would form the basis for avionics systems that would be used in future families of space vehicles in a variety of missions. The principal contractors were General Dynamics, Boeing, and Draper Laboratories. These contractors participated in a series of review meetings, and submitted final reports defining their candidate architectures. NASA then commissioned the Research Triangle Institute (RTI) to perform an assessment of these architectures to identify strengths and weaknesses of each. This report is a separate, independent review of the RTI assessment, done primarily to assure that the assessment was comprehensive and objective. The report also includes general recommendations relative to further MPRAS development.

  10. Savannah River Site - Tank 48 Briefing on SRS Tank 48 Independent...

    Office of Environmental Management (EM)

    SRS Tank 48 Independent Technical Review August 2006 2 SRS Tank 48 ITR SRS Tank 48 ITR Key ITR Observation Two distinct problems: Removing tetraphenylborate (TPB) waste and then ...

  11. Application of PSA to review and define technical specifications for advanced nuclear power plants

    SciTech Connect (OSTI)

    Kim, I.S.; Samanta, P.K.; Reinhart, F.M.; Wohl, M.L.

    1995-11-01

    As part of the design certification process, probabilistic safety assessments (PSAS) are performed at the design stage for each advanced nuclear power plant. Among other usages, these PSAs are important inputs in defining the Technical Specifications (TSs) for these plants. Knowledge gained from their use in improving the TSs for operating nuclear power plants is providing methods and insights for using PSAs at this early stage. Evaluating the safety or the risk significance of the TSs to be defined for an advanced plant encompasses diverse aspects: (a) determining the basic limiting condition for operation (LCO); (b) structuring conditions associated with the LCO; (c) defining completion times (equivalent to allowed outage times in the TS for conventional plants); and, (d) prescribing required actions to be taken within the specified completion times. In this paper, we consider the use of PSA in defining the TSs for an advanced nuclear plant, namely General Electric`s Advanced Boiling Water Reactor (ABWR). Similar approaches are being taken for ABB-CE`s System 80+ and Westinghouse`s AP-600. We discuss the general features of an advanced reactor`s TS, how PSA is being used in reviewing the TSs, and we give an example where the TS submittal was reviewed using a PSA-based analysis to arrive at the requirements for the plant.

  12. Technical cooperation on nuclear security between the United States and China : review of the past and opportunities for the future.

    SciTech Connect (OSTI)

    Pregenzer, Arian Leigh

    2011-12-01

    The United States and China are committed to cooperation to address the challenges of the next century. Technical cooperation, building on a long tradition of technical exchange between the two countries, can play an important role. This paper focuses on technical cooperation between the United States and China in the areas of nonproliferation, arms control and other nuclear security topics. It reviews cooperation during the 1990s on nonproliferation and arms control under the U.S.-China Arms Control Exchange, discusses examples of ongoing activities under the Peaceful Uses of Technology Agreement to enhance security of nuclear and radiological material, and suggests opportunities for expanding technical cooperation between the defense nuclear laboratories of both countries to address a broader range of nuclear security topics.

  13. Independent Review of Mitigating System Performance Indicator Reporting in the EPIX Database

    SciTech Connect (OSTI)

    Wierman, Thomas Edward

    2009-05-01

    This report summarizes work done to verify the component, failure mode, and method of detection information provided in the Equipment Performance Information Exchange (EPIX) to support implementation of Mitigating Systems Performance Indices. This task is to select reports from EPIX and determine if their categorization as MSPI or non-MSPI failures is consistent with the development of unreliability baseline failure rates, and whether this significantly affects estimates of plant risk. This review is of all MSPI devices in EPIX that were reported as failures. The components include emergency generators; motor-driven, turbine-driven, and enginedriven pumps; and air and motor-operated valves. The date range for this report includes all MSPI device reported failures from 2003 to the most current EPIX data at the INL (up to the 3rd quarter 2008).

  14. Hanford ETR Tank Waste Treatment and Immobilization Plant - Hanford Tank Waste Treatment and Immobilization Plant Technical Review - External Flowsheet Review Team (Technical) Report

    Office of Environmental Management (EM)

    Environmental Reviews | Department of Energy Handbook Issued on NEPA and CEQA: Integrating Federal and State Environmental Reviews Handbook Issued on NEPA and CEQA: Integrating Federal and State Environmental Reviews March 7, 2014 - 1:10pm Addthis CEQA-NEPA-CEQandCAseals.JPG The Council on Environmental Quality (CEQ) and the California Governor's Office of Planning and Research (OPR) jointly issued a new handbook, NEPA and CEQA: Integrating Federal and State Environmental Reviews. In

  15. Independent oversight review of the Department of Energy Quality Assurance Program for suspect/counterfeit parts. Revision 1

    SciTech Connect (OSTI)

    1996-05-01

    To address the potential threat that suspect/counterfeit parts could pose to DOE workers and the public, the Office of the Deputy Assistant Secretary for Oversight initiated a number of activities beginning in mid-1995. Oversight placed increased emphasis on the field`s quality assurance-suspect/counterfeit parts programs during safety management evaluations, in keeping with the Office of Environment, Safety and Health (EH) oversight responsibilities, which include oversight of the Department`s quality assurance (QA) programs. In addition, Oversight reviewed relevant policy documents and occurrence reports to determine the nature and magnitude of the problem within the Department. The results of that review, contained in an Office of Oversight report, Independent Oversight Analysis of Suspect/Counterfeit Parts Within the Department of Energy (November 1995), indicate a lack of consistency and comprehensiveness in the Department`s QA-suspect/counterfeit parts program. A detailed analysis of the causes and impacts of the problem was recommended. In response, this review was initiated to determine the effectiveness of the Department`s QA program for suspect/counterfeit parts. This study goes beyond merely assessing and reporting the status of the program, however. It is the authors intention to highlight the complex issues associated with suspect/counterfeit parts in the Department today and to present approaches that DOE managers might consider to address these issues.

  16. Technical criteria for an Area-Of-Review variance methodology. Appendix B

    SciTech Connect (OSTI)

    1994-01-01

    This guidance was developed by the Underground Injection Practices Research Foundation to assist Underground Injection Control Directors in implementing proposed changes to EPA`s Class 2 Injection Well Regulations that will apply the Area-Of-Review (AOR) requirement to previously exempt wells. EPA plans to propose amendments this year consistent with the recommendations in the March 23, 1992, Final Document developed by the Class 2 Injection Well Advisory Committee, that will require AORs to be performed on all Class 2 injection wells except those covered by previously conducted AORs and those located in areas that have been granted a variance. Variances may be granted if the Director determines that there is a sufficiently low risk of upward fluid movement from the injection zone that could endanger underground sources of drinking water. This guidance contains suggested technical criteria for identifying areas eligible for an AOR variance. The suggested criteria were developed in consultation with interested States and representatives from EPA, industry and the academic community. Directors will have six months from the promulgation of the new regulations to provide EPA with either a schedule for performing AOR`s within five years on all wells not covered by previously conducted AORs, or notice of their intent to establish a variance program. It is believed this document will provide valuable assistance to Directors who are considering whether to establish a variance program or have begun early preparations to develop such a program.

  17. DOE Technical Assistance Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    TAP offers: * One-on-one assistance * Extensive online resource library, including: ... Technical * Renewable energy siting and development * Review of technical specs for RFPs * ...

  18. INDEPENDENT COST REVIEW (ICR)

    Office of Environmental Management (EM)

    the entire effort, including report preparation and logistics, on comparatively straightforward ICRs for which no contractor support is required. However, for more complex ICRs...

  19. Technical Qualification Program Reaccreditation Report - Y-12 Site Office |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Reaccreditation Report - Y-12 Site Office Technical Qualification Program Reaccreditation Report - Y-12 Site Office The accreditation process consists of three distinct activities: (1) a thorough self-evaluation by the organization requesting accreditation; (2) an independent, onsite evaluation by a TQP Accreditation Review Team; and (3) a review by an independent TQP Accreditation Board. This report documents the results of the review of the National Nuclear Security

  20. Proceedings of the technical review on advances in geothermal reservoir technology---Research in progress

    SciTech Connect (OSTI)

    Lippmann, M.J.

    1988-09-01

    This proceedings contains 20 technical papers and abstracts describing most of the research activities funded by the Department of Energy (DOE's) Geothermal Reservoir Technology Program, which is under the management of Marshall Reed. The meeting was organized in response to several requests made by geothermal industry representatives who wanted to learn more about technical details of the projects supported by the DOE program. Also, this gives them an opportunity to personally discuss research topics with colleagues in the national laboratories and universities.

  1. Technical Assessment: Cryo-Compressed Hydrogen Storage for Vehicular

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Applications | Department of Energy Assessment: Cryo-Compressed Hydrogen Storage for Vehicular Applications Technical Assessment: Cryo-Compressed Hydrogen Storage for Vehicular Applications Technical report describing DOE's assessment of storing hydrogen at cryogenic temperatures within a pressure vessel on-board a vehicle. The report includes an overview of technical progress to date, including the potential to meet DOE onboard storage targets, as well an independent reviews of system cost

  2. Technical Assessment Team Report

    Broader source: Energy.gov [DOE]

    The Technical Assessment Team (TAT) is an independent team of technical experts that evaluated the mechanisms and chemical reactions contributing to the failure of a waste drum at the Waste...

  3. SU-E-CAMPUS-J-04: Image Guided Radiation Therapy (IGRT): Review of Technical Standards and Credentialing in Radiotherapy Clinical Trials

    SciTech Connect (OSTI)

    Giaddui, T; Chen, W; Yu, J; Gong, Y; Galvin, J; Xiao, Y; Cui, Y; Yin, F; Craig, T; Dawson, L; Al-Hallaq, H; Chmura, S

    2014-06-15

    Purpose: To review IGRT credentialing experience and unexpected technical issues encountered in connection with advanced radiotherapy technologies as implemented in RTOG clinical trials. To update IGRT credentialing procedures with the aim of improving the quality of the process, and to increase the proportion of IGRT credentialing compliance. To develop a living disease site-specific IGRT encyclopedia. Methods: Numerous technical issues were encountered during the IGRT credentialing process. The criteria used for credentialing review were based on: image quality; anatomy included in fused data sets and shift results. Credentialing requirements have been updated according to the AAPM task group reports for IGRT to ensure that all required technical items are included in the quality review process. Implementation instructions have been updated and expanded for recent protocols. Results: Technical issues observed during the credentialing review process include, but are not limited to: poor quality images; inadequate image acquisition region; poor data quality; shifts larger than acceptable; no soft tissue surrogate. The updated IGRT credentialing process will address these issues and will also include the technical items required from AAPM: TG 104; TG 142 and TG 179 reports. An instruction manual has been developed describing a remote credentialing method for reviewers. Submission requirements are updated, including images/documents as well as facility questionnaire. The review report now includes summary of the review process and the parameters that reviewers check. We have reached consensus on the minimum IGRT technical requirement for a number of disease sites. RTOG 1311(NRG-BR002A Phase 1 Study of Stereotactic Body Radiotherapy (SBRT) for the Treatment of Multiple Metastases) is an example, here; the protocol specified the minimum requirement for each anatomical sites (with/without fiducials). Conclusion: Technical issues are identified and reported. IGRT

  4. Vehicle Technologies Office Merit Review 2015: Alternative Fuel Tools and Technical Assistance Activities

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presentation given by Argonne National Laboratory at 2015 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about alternative fuel...

  5. Vehicle Technologies Office Merit Review 2015: Clean Cities "Tiger Team" Technical and Problem Solving Assistance

    Broader source: Energy.gov [DOE]

    Presentation given by National Renewable Energy Laboratory at 2015 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about Clean...

  6. Independent Oversight Review, Richland Operations Office and CH2M Hill Plateau Remediation Company and Mission Support Alliance- April 2012

    Broader source: Energy.gov [DOE]

    Review of Richland Operations Office and CH2M Hill Plateau Remediation Company and Mission Support Alliance Conduct of Operations

  7. Technical Market Analysis for Biochemical Conversion Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technical Market Analysis for Biochemical Conversion March 23, 2015 Biochemical Conversion Jim Collett and Mark Butcher PNNL This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal Statement Challenge: Process and economic data on hydrocarbon production via bioconversion that are freely available to industry are limited. Data at industrially-relevant scales are limited because published research focuses mainly on compound discovery at lab-scale

  8. Independent Oversight Review of Department of Energy Contractor Occupational Medicine Programs from June 1998 to December 1999

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Executive Summary The Department of Energy (DOE) Office of Oversight performed a two-phased review of eight Departmental contractor occupational medicine programs. The first phase of the review was completed in September 1998 and the second phase in December 1999. To conduct the review, Oversight teamed with the Accreditation Association for Ambulatory Health Care (AAAHC), a non-profit accreditation organization for health-care facilities. The Office of Oversight's interim report on the three

  9. Low-level liquid radioactive waste treatment at Murmansk, Russia: Technical design and review of facility upgrade and expansion

    SciTech Connect (OSTI)

    Dyer, R.S.; Diamante, J.M.; Duffey, R.B.

    1996-07-01

    The governments of Norway and the US have committed their mutual cooperation and support the Murmansk Shipping Company (MSCo) to expand and upgrade the Low-Level Liquid Radioactive Waste (LLRW) treatment system located at the facilities of the Russian company RTP Atomflot, in Murmansk, Russia. RTP Atomflot provides support services to the Russian icebreaker fleet operated by the MSCo. The objective is to enable Russia to permanently cease disposing of this waste in Arctic waters. The proposed modifications will increase the facility`s capacity from 1,200 m{sup 3} per year to 5,000 m{sup 3} per year, will permit the facility to process high-salt wastes from the Russian Navy`s Northern fleet, and will improve the stabilization and interim storage of the processed wastes. The three countries set up a cooperative review of the evolving design information, conducted by a joint US and Norwegian technical team from April through December, 1995. To ensure that US and Norwegian funds produce a final facility which will meet the objectives, this report documents the design as described by Atomflot and the Russian business organization, ASPECT, both in design documents and orally. During the detailed review process, many questions were generated, and many design details developed which are outlined here. The design is based on the adsorption of radionuclides on selected inorganic resins, and desalination and concentration using electromembranes. The US/Norwegian technical team reviewed the available information and recommended that the construction commence; they also recommended that a monitoring program for facility performance be instituted.

  10. Independent Oversight Review of the Los Alamos National Laboratory Transuranic Waste Facility Safety Basis and Design Development, July 2014

    Office of Environmental Management (EM)

    Los Alamos National Laboratory Transuranic Waste Facility Safety Basis and Design Development July 2014 Office of Nuclear Safety and Environmental Assessments Office of Environment, Safety and Health Assessments Office of Independent Enterprise Assessments U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................ 1 2.0 Scope ...

  11. SCFA lead lab technical assistance at Lawrence Berkeley National Laboratory: Baseline review of three groundwater plumes

    SciTech Connect (OSTI)

    Hazen, Terry; et al.

    2002-09-26

    During the closeout session, members of the technical assistance team conveyed to the site how impressed they were at the thoroughness of the site's investigation and attempts at remediation. Team members were uniformly pleased at the skilled detection work to identify sources, make quick remediation decisions, and change course when a strategy did not work well. The technical assistance team also noted that, to their knowledge, this is the only DOE site at which a world-class scientist has had primary responsibility for the environmental restoration activities. This has undoubtedly contributed to the successes observed and DOE should take careful note. The following overall recommendations were agreed upon: (1) The site has done a phenomenal job of characterization and identifying and removing source terms. (2) Technologies selected to date are appropriate and high impact, e.g. collection trenches are an effective remedial strategy for this complicated geology. The site should continue using technology that is adapted to the site's unique geology, such as the collection trenches. (3) The site should develop a better way to determine the basis of cleanup for all sites. (4) The sentinel well system should be evaluated and modified, if needed, to assure that the sentinel wells provide coverage to the current site boundary. Potential modifications could include installation, abandonment or relocation of wells based on the large amount of data collected since the original sentinel well system was designed. (5) Modeling to assist in remedial design and communication should continue. (6) The site should develop a plan to ensure institutional memory. (7) The most likely possibility for improving closure to 2006 is by removing the residual source of the Old Town plume and establishing the efficacy of remediation for the 51/64 plume.

  12. Documentation of Hanford Site independent review of the Hanford Waste Vitrification Plant Preliminary Safety Analysis Report. Revision 2

    SciTech Connect (OSTI)

    Herborn, D.I.

    1992-10-01

    This manual describes the overall WHC safety analysis process in terms of requirements for safety analyses, responsibilities of the various contributing organizations, and required reviews and approvals for the Hanford Waste Vitrification Plant.

  13. Enterprise Assessments Review of the Los Alamos National Laboratory Transuranic Waste Facility 90% Draft Documented Safety Analysis and Technical Safety Requirements Submittals – EA-LANL-2015-07-07

    Office of Energy Efficiency and Renewable Energy (EERE)

    Operational Awareness Record for the Review of the Transuranic Waste Facility 90% Draft Documented Safety Analysis and Technical Safety Requirements Submittals

  14. Role of the Technical Aspects of Hypofractionated Radiation Therapy Treatment of Prostate Cancer: A Review

    SciTech Connect (OSTI)

    Clemente, Stefania; Nigro, Roberta; Oliviero, Caterina; Marchioni, Chiara; Esposito, Marco; Giglioli, Francesca Romana; Mancosu, Pietro; Marino, Carmelo; Russo, Serenella; Stasi, Michele; Strigari, Lidia; Veronese, Ivan; Landoni, Valeria

    2015-01-01

    The increasing use of moderate (<35 fractions) and extreme (<5 fractions) hypofractionated radiation therapy in prostate cancer is yielding favorable results, both in terms of maintained biochemical response and toxicity. Several hypofractionation (HF) schemes for the treatment of prostate cancer are available, although there is considerable variability in the techniques used to manage intra-/interfraction motion and deliver radiation doses. We performed a review of the published studies on HF regimens as a topic of interest for the Stereotactic Ablative Radiotherapy working group, which is part of the Italian Association of Medical Physics. Aspects of organ motion management (imaging for contouring, target volume definition, and rectum/bladder preparation) and treatment delivery (prostate localization, image guided radiation therapy strategy and frequency) were evaluated and categorized to assess outcome relative to disease control and toxicity. Despite the heterogeneity of the data, some interesting trends that emerged from the review might be useful in identifying an optimum HF strategy.

  15. Voluntary Protection Program Onsite Review, CH2M HILL Analytical Technical

    Office of Environmental Management (EM)

    Engineering Services, LLC - September 2015 | Department of Energy Burns & McDonnell - Facility Engineering Services, LLC - September 2015 Voluntary Protection Program Onsite Review, Burns & McDonnell - Facility Engineering Services, LLC - September 2015 September 2015 Recertification of FES as a Star Participant in the Department of Energy Voluntary Protection Program. This report summarizes the results from the evaluation of Burns & McDonnell - Facility Engineering Services, LLC

  16. Yucca Mountain program summary of research and technical review activities, July 1988--June 1989

    SciTech Connect (OSTI)

    1989-11-01

    The Desert Research Institute (DRI), through its Water Resources Center (WRC), since 1984 has supported the State of Nevada Nuclear Waste Project Office`s activities related to the proposed high-level radioactive waste repository at Yucca Mountain on the Nevada Test Site (NTS). This effort is directed at providing the State Office with an unbiased evaluation of the Yucca Mountain Project (YMP) investigations performed by the US Department of Energy (DOE) and the Nuclear Regulatory Commission (NRC). The overall objective is to determine independently whether or not the site meets the performance criteria defined by the Nuclear Waste Policy Act of 1982 and amendments for isolating and containing the wastes during emplacement and the proposed life of the repository. A particularly important area of concern with the proposed repository is the site`s hydrology. The faculty of the DRI have long been involved with research throughout the State and have particular expertise in groundwater studies related to radionuclide migration and hydrologic safety of underground nuclear testing by DOE and predecessor agencies. In addition, we utilize laboratory personnel for chemical and isotopic analyses in both of the DRI-WMC water chemistry laboratories.

  17. Justice Department review of federal coal and oil leasing: serving the consistent goals of competition and energy independence

    SciTech Connect (OSTI)

    Kaplan, D.A.

    1981-01-01

    As the nation moves into the 1980s, development of our domestic energy resources must surely be the number one priority of energy policy. Important natural resources are owned by the Federal government and must be dedicated to development in the public interest. This includes a government leasing program which fosters competitive and efficient development of these resources by private companies. Through its antitrust review of individual leases and its general advocacy of competition in the leasing program, the Department of Justice seeks to bring the prospect of a sound national energy policy closer to reality. Examples of how this review functions are drawn from the Outer Continental Shelf Land Acts Amendments of 1978 and the Federal Coal Leasing Amendments Act of 1975. 32 references.

  18. Documentation of Hanford Site independent review of the Hanford Waste Vitrification Plant Preliminary Safety Analysis Report. Revision 3

    SciTech Connect (OSTI)

    Herborn, D.I.

    1993-11-01

    Westinghouse Hanford Company (WHC) is the Integrating Contractor for the Hanford Waste Vitrification Plant (HWVP) Project, and as such is responsible for preparation of the HWVP Preliminary Safety Analysis Report (PSAR). The HWVP PSAR was prepared pursuant to the requirements for safety analyses contained in US Department of Energy (DOE) Orders 4700.1, Project Management System (DOE 1987); 5480.5, Safety of Nuclear Facilities (DOE 1986a); 5481.lB, Safety Analysis and Review System (DOE 1986b) which was superseded by DOE order 5480-23, Nuclear Safety Analysis Reports, for nuclear facilities effective April 30, 1992 (DOE 1992); and 6430.lA, General Design Criteria (DOE 1989). The WHC procedures that, in large part, implement these DOE requirements are contained in WHC-CM-4-46, Nonreactor Facility Safety Analysis Manual. This manual describes the overall WHC safety analysis process in terms of requirements for safety analyses, responsibilities of the various contributing organizations, and required reviews and approvals.

  19. Independent Review of Elemental Phosphorus Remediation at the Eastern Michaud Flats FMC Operable Unit near Pocatello, Idaho

    SciTech Connect (OSTI)

    Martino, L. E.; Jerden, J. J.; Kimmell, T. A.; Quinn, J.

    2016-01-01

    If, despite risks to workers and these potential impacts, stakeholders decide that P4 wastes need to be excavated and treated, the Review Team determined that a number of the ETTs examined warrant further consideration for the treatment of P4 waste that has been characterized (for example, P4 waste present in the historical ponds). Nevertheless, concerns about the health and safety of site investigation workers using then-available investigation approaches prevented the collection of subsurface samples containing P4 from large areas of the site (e.g., the railroad swale, the vadose zone beneath the Furnace Building, and the abandoned railcars), As a result, the contaminant CSM in those particular areas was not refined enough to allow the Review Team to draw conclusions about using some of the ETTs to treat P4 waste in those areas. The readiness of an ETT for implementation varies depending on many factors, including stakeholder input, permitting, and remedial action construction requirements. Technologies that could be ready for use in the near term (within 1 year) include the following: mechanical excavation, containment technologies, off-site incineration, and drying and mechanical mixing under a tent structure. Technologies that could be ready for use in the mid-term (1 to 2 years) include cutter suction dredging, thermal-hydraulic dredging, and underground pipeline cleaning technologies. Technologies requiring a longer lead time (2 to 5 years) include on-site incineration, a land disposal restriction waste treatment system, an Albright & Wilson batch mud still, post-treatment on-site disposal, and post-treatment off-site disposal.

  20. Index to Nuclear Safety: a technical progress review by chronology, permuted title, and author, Volume 18 (1) through Volume 22 (6)

    SciTech Connect (OSTI)

    Cottrell, W.B.; Passiakos, M.

    1982-06-01

    This index to Nuclear Safety covers articles published in Nuclear Safety, Volume 18, Number 1 (January-February 1977) through Volume 22, Number 6 (November-December 1981). The index is divided into three section: a chronological list of articles (including abstracts), a permuted-title (KWIC) index, and an author index. Nuclear Safety, a bimonthly technical progress review prepared by the Nuclear Safety Information Center, covers all safety aspects of nuclear power reactors and associated facilities. Over 300 technical articles published in Nuclear Safety in the last 5 years are listed in this index.

  1. Applying Human-performance Models to Designing and Evaluating Nuclear Power Plants: Review Guidance and Technical Basis

    SciTech Connect (OSTI)

    O'Hara, J.M.

    2009-11-30

    Human performance models (HPMs) are simulations of human behavior with which we can predict human performance. Designers use them to support their human factors engineering (HFE) programs for a wide range of complex systems, including commercial nuclear power plants. Applicants to U.S. Nuclear Regulatory Commission (NRC) can use HPMs for design certifications, operating licenses, and license amendments. In the context of nuclear-plant safety, it is important to assure that HPMs are verified and validated, and their usage is consistent with their intended purpose. Using HPMs improperly may generate misleading or incorrect information, entailing safety concerns. The objective of this research was to develop guidance to support the NRC staff's reviews of an applicant's use of HPMs in an HFE program. The guidance is divided into three topical areas: (1) HPM Verification, (2) HPM Validation, and (3) User Interface Verification. Following this guidance will help ensure the benefits of HPMs are achieved in a technically sound, defensible manner. During the course of developing this guidance, I identified several issues that could not be addressed; they also are discussed.

  2. Program Evaluation: Define Review Purpose and Scope | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Define Review Purpose and Scope Program Evaluation: Define Review Purpose and Scope The first step in preparation for a particular peer review is to determine the specific purpose and scope of the review within the context of other review and management activities. Improving program management and demonstrating public accountability, providing an honest independent technical review of the projects and program, and communicating the value of the programs to the larger public are all potentially

  3. Technical Review Report for the Safety Analysis Report for Packaging Model 9977 S-SARP-G-00001 Revision 2

    SciTech Connect (OSTI)

    DiSabatino, A; Hafner, R; West, M

    2007-10-04

    This Technical Review Report (TRR) summarizes the review findings for the Safety Analysis Report for Packaging (SARP) for the Model 9977 B(M)F-96 shipping container. The content analyzed for this submittal is Content Envelope C.1, Heat Sources, in assemblies of Radioisotope Thermoelectric Generators or food-pack cans. The SARP under review, i.e., S-SARP-G-00001, Revision 2 (August 2007), was originally referred to as the General Purpose Fissile Material Package. The review presented in this TRR was performed using the methods outlined in Revision 3 of the Department of Energy's (DOE's) Packaging Review Guide (PRG) for Reviewing Safety Analysis Reports for Packages. The format of the SARP follows that specified in Revision 2 of the Nuclear Regulatory Commission's, Regulatory Guide 7.9, i.e., Standard Format and Content of Part 71 Applications for Approval of Packages for Radioactive Material. Although the two documents are similar in their content, they are not identical. Formatting differences have been noted in this TRR, where appropriate. The Model 9977 Package is a 35-gallon drum package design that has evolved from a family of packages designed by DOE contractors at the Savannah River Site. The Model 9977 Package design includes a single, 6-inch diameter, stainless steel pressure vessel containment system (i.e., the 6CV) that was designed and fabricated in accordance with Section III, Subsection NB, of the American Society of Mechanical Engineers Boiler & Pressure Vessel Code. The earlier package designs, i.e., the Model 9965, 9966, 9967 and 9968 Packages, were originally designed and certified in the 1980s. In the 1990s, updated package designs that incorporated design features consistent with new safety requirements, based on International Atomic Energy Agency guidelines, were proposed. The updated package designs were the Model 9972, 9973, 9974 and 9975 Packages, respectively. The Model 9975 Package was certified by the Packaging Certification Program, under

  4. EE Technical Review

    SciTech Connect (OSTI)

    Not Available

    1985-12-01

    Brief summaries are given of electronics engineering work, including: laser engineering, engineering research, nuclear energy systems, engineering services, and field test systems. Individual papers are abstracted separately. (LEW)

  5. Enterprise Assessments Review, West Valley Demonstration Project -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    December 2014 | Department of Energy Emergency Management Program Technical Basis and Emergency Preparedness The U.S. Department of Energy (DOE) independent Office of Enterprise Assessments (EA) was established in May 2014 and assumed responsibility for managing the Department's independent oversight program from the Department's former Office of Health, Safety and Security (HSS). This independent review of the emergency management program at the West Valley Demonstration Project (WVDP) was

  6. Building Energy Codes Collaborative Technical Assistance for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Collaborative Technical Assistance for States Building Energy Codes Collaborative Technical ... 2014 BTO Peer Review Southeast Energy Efficiency Alliance's Building Energy Codes ...

  7. 2015 Peer Review Report -- Geothermal Technologies Office | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Peer Review Report -- Geothermal Technologies Office 2015 Peer Review Report -- Geothermal Technologies Office 2015 Peer Review Report -- Geothermal Technologies Office On May 11-14, 2015, the GTO conducted its bi-annual program peer review in Westminster, Colorado. In addition to providing independent, expert evaluation of the technical progress and merit of GTO-funded projects, the review was a forum for feedback and recommendations on future GTO strategic planning. Further, this

  8. 2013 Geothermal Technologies Office Peer Review Report

    SciTech Connect (OSTI)

    none,

    2014-01-01

    Geothermal Technologies Office conducted its annual program peer review in April of 2013. The review provided an independent, expert evaluation of the technical progress and merit of GTO-funded projects. Further, the review was a forum for feedback and recommendations on future GTO strategic planning. During the course of the peer review, DOE-funded projects were evaluated for 1) their contribution to the mission and goals of the GTO and 2) their progress against stated project objectives. Principal Investigators (PIs) came together in sessions organized by topic “tracks” to disseminate information, progress, and results to a panel of independent experts as well as attendees.

  9. Program Evaluation: Independence, Conflict of Interest, Openness |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Planning & Conducting Evaluations » Program Evaluation: Independence, Conflict of Interest, Openness Program Evaluation: Independence, Conflict of Interest, Openness This page discusses the aspects of independence, conflict of interest, and public vs. closed sessions, in preparation for successful peer reviews. Independence The review leader and the program manager should decide at the outset the desired level of independence and the degree of external control for

  10. Technical Assessment of Cryo-Compressed Hydrogen Storage Tank Systems for Automotive Applications

    SciTech Connect (OSTI)

    Ahluwalia, Rajesh; Hua, T. Q.; Peng, J. -K.; Lasher, S.; McKenney, Kurtis; Sinha, J.

    2009-12-01

    Technical report describing DOE's second assessment report on a third generation (Gen3) system capable of storing hydrogen at cryogenic temperatures within a pressure vessel on-board a vehicle. The report includes an overview of technical progress to date, including the potential to meet DOE onboard storage targets, as well as independent reviews of system cost and energy analyses of the technology paired with delivery costs.

  11. Peer review panel summary report for technical determination of mixed waste incineration off-gas systems for Rocky Flats; Appendix A

    SciTech Connect (OSTI)

    1992-12-31

    A Peer Review Panel was convened on September 15-17, 1992 in Boulder, Co. The members of this panel included representatives from DOE, EPA, and DOE contractors along with invited experts in the fields of air pollution control and waste incineration. The primary purpose of this review panel was to make a technical determination of a hold, test and release off gas capture system should be implemented in the proposed RF Pland mixed waste incineration system; or if a state of the art continuous air pollution control and monitoring system should be utilized as the sole off-gas control system. All of the evaluations by the panel were based upon the use of the fluidized bed unit proposed by Rocky Flats and cannot be generalized to other systems.

  12. Independent Study Form | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy Independent Oversight Review, Los Alamos National Laboratory - April 2012 Independent Oversight Review, Los Alamos National Laboratory - April 2012 April 2012 Review of the Emergency Response Organization at the Los Alamos National Laboratory This report provides the results of an independent review of the Los Alamos National Laboratory emergency response organization program that was conducted February 7-9, 2012, by the Office of Safety and Emergency Management

  13. Technical Roadmaps for Public Comment

    Broader source: Energy.gov [DOE]

    Two technical roadmaps for leading geothermal technology sectors are open for review by the geothermal community and posted below for your feedback.

  14. Independent Oversight Lessons Learned from the 2013 Targeted Reviews of Emergency Preparedness for Severe Natural Phenomena Events at Selected Department of Energy Facilities- February 2014

    Broader source: Energy.gov [DOE]

    Targeted Reviews of Emergency Preparedness for Severe Natural Phenomena Events at Selected Department of Energy Facilities

  15. Check Estimates and Independent Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Check estimates and independent cost estimates (ICEs) are tools that can be used to validate a cost estimate. Estimate validation entails an objective review of the estimate to ensure that estimate criteria and requirements have been met and well documented, defensible estimate has been developed. This chapter describes check estimates and their procedures and various types of independent cost estimates.

  16. Independent Activity Report, Pantex Plant - July 2012 | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Report, Pantex Plant - November 2012 Independent Activity Report, Pantex Plant - October 2011 Technical Qualification Program Self-Assessment Report - NNSA Production Office - 2014...

  17. Enterprise Assessments Targeted Review of the Targeted Review of the Safety Significant Ventilation System and Interconnected Portions of the Associated Safety Class Confinement System, and Review of Federal Assurance Capability at the Los Alamos National Laboratory Technical Area 55 Plutonium Facility … August 2015

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review of the Safety Significant Ventilation System and Interconnected Portions of the Associated Safety Class Confinement System, and Review of Federal Assurance Capability at the Los Alamos National Laboratory Technical Area 55 Plutonium Facility August 2015 Office of Nuclear Safety and Environmental Assessments Office of Environment, Safety and Health Assessments Office of Enterprise Assessments U.S. Department of Energy i Table of Contents Acronyms

  18. DOE-DARPA High-Performance Corrosion-Resistant Materials (HPCRM), Annual HPCRM Team Meeting & Technical Review

    SciTech Connect (OSTI)

    Farmer, J; Brown, B; Bayles, B; Lemieux, T; Choi, J; Ajdelsztajn, L; Dannenberg, J; Lavernia, E; Schoenung, J; Branagan, D; Blue, C; Peter, B; Beardsley, B; Graeve, O; Aprigliano, L; Yang, N; Perepezko, J; Hildal, K; Kaufman, L; Lewandowski, J; Perepezko, J; Hildal, K; Kaufman, L; Lewandowski, J; Boudreau, J

    2007-09-21

    The overall goal is to develop high-performance corrosion-resistant iron-based amorphous-metal coatings for prolonged trouble-free use in very aggressive environments: seawater & hot geothermal brines. The specific technical objectives are: (1) Synthesize Fe-based amorphous-metal coating with corrosion resistance comparable/superior to Ni-based Alloy C-22; (2) Establish processing parameter windows for applying and controlling coating attributes (porosity, density, bonding); (3) Assess possible cost savings through substitution of Fe-based material for more expensive Ni-based Alloy C-22; (4) Demonstrate practical fabrication processes; (5) Produce quality materials and data with complete traceability for nuclear applications; and (6) Develop, validate and calibrate computational models to enable life prediction and process design.

  19. Technical Assessment Team Fact Sheet

    Broader source: Energy.gov [DOE]

    This fact sheet focuses on the U.S. Department of Energy’s report by an independent team of technical experts that evaluated the mechanisms and chemical reactions contributing to the failure of a...

  20. Independent Activity Report, Los Alamos National Laboratory ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    July 2012 Independent Activity Report, Los Alamos National Laboratory - July 2012 July 2012 Initial Meeting of Representatives from LANL, LASO, and HS-45 To Review Progress and...

  1. Technical and regulatory review of the Rover nuclear fuel process for use on Fort St. Vrain fuel

    SciTech Connect (OSTI)

    Hertzler, T.

    1993-02-01

    This report describes the results of an analysis for processing and final disposal of Fort St. Vrain (FSV) irradiated fuel in Rover-type equipment or technologies. This analysis includes an evaluation of the current Rover equipment status and the applicability of this technology in processing FSV fuel. The analyses are based on the physical characteristics of the FSV fuel and processing capabilities of the Rover equipment. Alternate FSV fuel disposal options are also considered including fuel-rod removal from the block, disposal of the empty block, or disposal of the entire fuel-containing block. The results of these analyses document that the current Rover hardware is not operable for any purpose, and any effort to restart this hardware will require extensive modifications and re-evaluation. However, various aspects of the Rover technology, such as the successful fluid-bed burner design, can be applied with modification to FSV fuel processing. The current regulatory climate and technical knowledge are not adequately defined to allow a complete analysis and conclusion with respect to the disposal of intact fuel blocks with or without the fuel rods removed. The primary unknowns include the various aspects of fuel-rod removal from the block, concentration of radionuclides remaining in the graphite block after rod removal, and acceptability of carbon in the form of graphite in a high level waste repository.

  2. 2014 Wind Program Peer Review Report

    SciTech Connect (OSTI)

    none,

    2014-10-01

    The Wind Program Peer Review Meeting was held March 24-28, 2014 in Arlington, VA. Principle investigators from the Energy Department, National Laboratories, academic, and industry representatives presented the progress of their DOE-funded research. This report documents the formal, rigorous evaluation process and findings of nine independent reviewers who examined the technical, scientific, and business results of Wind Program funded projects, as well as the productivity and management effectiveness of the Wind Program itself.

  3. 2014 Water Power Program Peer Review Report

    SciTech Connect (OSTI)

    none,

    2014-08-18

    The Water Power Peer Review Meeting was held February 24-28, 2014 in Arlington, VA. Principle investigators from the Energy Department National Laboratories, academic, and industry representatives presented the progress of their DOE-funded research. This report documents the formal, rigorous evaluation process and findings of nine independent reviewers who examined the technical, scientific, and business results of 96 projects of the Water Power Program, as well as the productivity and management effectiveness of the Water Power Program itself.

  4. A technical review of urban land use - transportation models as tools for evaluating vehicle travel reduction strategies

    SciTech Connect (OSTI)

    Southworth, F.

    1995-07-01

    The continued growth of highway traffic in the United States has led to unwanted urban traffic congestion as well as to noticeable urban air quality problems. These problems include emissions covered by the 1990 Clean Air Act Amendments (CAAA) and 1991 Intermodal Surface Transportation Efficiency Act (ISTEA), as well as carbon dioxide and related {open_quotes}greenhouse gas{close_quotes} emissions. Urban travel also creates a major demand for imported oil. Therefore, for economic as well as environmental reasons, transportation planning agencies at both the state and metropolitan area level are focussing a good deal of attention on urban travel reduction policies. Much discussed policy instruments include those that encourage fewer trip starts, shorter trip distances, shifts to higher-occupancy vehicles or to nonvehicular modes, and shifts in the timing of trips from the more to the less congested periods of the day or week. Some analysts have concluded that in order to bring about sustainable reductions in urban traffic volumes, significant changes will be necessary in the way our households and businesses engage in daily travel. Such changes are likely to involve changes in the ways we organize and use traffic-generating and-attracting land within our urban areas. The purpose of this review is to evaluate the ability of current analytic methods and models to support both the evaluation and possibly the design of such vehicle travel reduction strategies, including those strategies involving the reorganization and use of urban land. The review is organized into three sections. Section 1 describes the nature of the problem we are trying to model, Section 2 reviews the state of the art in operational urban land use-transportation simulation models, and Section 3 provides a critical assessment of such models as useful urban transportation planning tools. A number of areas are identified where further model development or testing is required.

  5. 2014 Wind Program Peer Review Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report 2014 Wind Program Peer Review Report The Wind Program Peer Review Meeting was held March 24-28, 2014 in Arlington, VA. Principle investigators from the Energy Department, National Laboratories, academic, and industry representatives presented the progress of their DOE-funded research. This report documents the formal, rigorous evaluation process and findings of nine independent reviewers who examined the technical, scientific, and business results of Wind Program funded projects, as well

  6. Results of a Technical Review of the U.S. Climate Change Technology Program's R&D Portfolio

    SciTech Connect (OSTI)

    Brown, Marilyn A

    2006-07-01

    The U.S. Climate Change Technology Program (CCTP) is a multi-agency planning and coordinating entity, led by the U.S. Department of Energy that aims to accelerate the development and facilitate the adoption of technologies to address climate change. In late 2005, CCTP asked Oak Ridge National Laboratory and Energetics Incorporated to organize and coordinate a review of the CCTP R&D portfolio using structured workshops. Each workshop focused on one of CCTP's six strategic goals: 1.Reduce emissions from energy end-use and infrastructure 2.Reduce emissions from energy supply 3.Capture and sequester carbon dioxide 4.Reduce emissions of non-CO2 greenhouse gases (GHG) 5.Improve capabilities to measure and monitor GHG emissions 6.Bolster basic science contributions to technology development To promote meaningful dialogue while ensuring broad coverage, a group of broadly experienced professionals with expertise in fields relevant to each CCTP goal were asked to participate in the portfolio reviews and associated workshops. A total of 75 experts participated in the workshops; 60 of these participants represented non-Federal organizations. This report summarizes the findings of the workshops and the results of the Delphi assessment of the CCTP R&D portfolio.

  7. Technical Assistance: Increasing Code Compliance - 2014 BTO Peer...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assistance: Increasing Code Compliance - 2014 BTO Peer Review Technical Assistance: ... View the Presentation PDF icon Technical Assistance: Increasing Code Compliance - 2014 BTO ...

  8. US DRIVE Hydrogen Storage Technical Team Roadmap | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Storage Technical Team Roadmap US DRIVE Hydrogen Storage Technical Team Roadmap The scope of the Hydrogen Storage Tech Team is to review and evaluate the potential, and ...

  9. Application of Engineering and Technical Requirements for 30...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Application of Engineering and Technical Requirements for 30, 60, and 90% Design of DOE Nuclear Facilities This Standard Review Plan (SRP), Application of Engineering and Technical ...

  10. Technical Guidance

    Broader source: Energy.gov [DOE]

    The Office of Technical Guidance, within the Office of Health, Safety and Security develops and issues Government-wide and Department-wide technical guidance to ensure that classified nuclear...

  11. Technical Review Report for the Model 9975-96 Package Safety Analysis Report for Packaging (S-SARP-G-00003, Revision 0, January 2008)

    SciTech Connect (OSTI)

    West, M

    2009-05-22

    This Technical Review Report (TRR) documents the review, performed by the Lawrence Livermore National Laboratory (LLNL) Staff, at the request of the U.S. Department of Energy (DOE), on the Safety Analysis Report for Packaging, Model 9975, Revision 0, dated January 2008 (S-SARP-G-00003, the SARP). The review includes an evaluation of the SARP, with respect to the requirements specified in 10 CFR 71, and in International Atomic Energy Agency (IAEA) Safety Standards Series No. TS-R-1. The Model 9975-96 Package is a 35-gallon drum package design that has evolved from a family of packages designed by DOE contractors at the Savannah River Site. Earlier package designs, i.e., the Model 9965, the Model 9966, the Model 9967, and the Model 9968 Packagings, were originally designed and certified in the early 1980s. In the 1990s, updated package designs that incorporated design features consistent with the then newer safety requirements were proposed. The updated package designs at the time were the Model 9972, the Model 9973, the Model 9974, and the Model 9975 Packagings, respectively. The Model 9975 Package was certified by the Packaging Certification Program, under the Office of Safety Management and Operations. The safety analysis of the Model 9975-85 Packaging is documented in the Safety Analysis Report for Packaging, Model 9975, B(M)F-85, Revision 0, dated December 2003. The Model 9975-85 Package is certified by DOE Certificate of Compliance (CoC) package identification number, USA/9975/B(M)F-85, for the transportation of Type B quantities of uranium metal/oxide, {sup 238}Pu heat sources, plutonium/uranium metals, plutonium/uranium oxides, plutonium composites, plutonium/tantalum composites, {sup 238}Pu oxide/beryllium metal.

  12. The Effects of Degraded Digital Instrumentation and Control Systems on Human-system Interfaces and Operator Performance: HFE Review Guidance and Technical Basis

    SciTech Connect (OSTI)

    O'Hara, J.M.; W. Gunther, G. Martinez-Guridi

    2010-02-26

    New and advanced reactors will use integrated digital instrumentation and control (I&C) systems to support operators in their monitoring and control functions. Even though digital systems are typically highly reliable, their potential for degradation or failure could significantly affect operator performance and, consequently, impact plant safety. The U.S. Nuclear Regulatory Commission (NRC) supported this research project to investigate the effects of degraded I&C systems on human performance and plant operations. The objective was to develop human factors engineering (HFE) review guidance addressing the detection and management of degraded digital I&C conditions by plant operators. We reviewed pertinent standards and guidelines, empirical studies, and plant operating experience. In addition, we conducted an evaluation of the potential effects of selected failure modes of the digital feedwater system on human-system interfaces (HSIs) and operator performance. The results indicated that I&C degradations are prevalent in plants employing digital systems and the overall effects on plant behavior can be significant, such as causing a reactor trip or causing equipment to operate unexpectedly. I&C degradations can impact the HSIs used by operators to monitor and control the plant. For example, sensor degradations can make displays difficult to interpret and can sometimes mislead operators by making it appear that a process disturbance has occurred. We used the information obtained as the technical basis upon which to develop HFE review guidance. The guidance addresses the treatment of degraded I&C conditions as part of the design process and the HSI features and functions that support operators to monitor I&C performance and manage I&C degradations when they occur. In addition, we identified topics for future research.

  13. Technical Review Report for the Justification for Shipment of Sodium-Bonded Carbide Fuel Pins in the T-3 Cask

    SciTech Connect (OSTI)

    West, M; DiSabatino, A

    2008-01-04

    This report documents the review of the Fluor Submittal (hereafter, the Submittal), prepared by Savannah River Packaging Technology (SRPT) of Savannah River National Laboratory (SRNL), at the request of the Department of Energy's (DOE) Richland Operations Office, for the shipment of unirradiated and irradiated sodium-bonded carbide fuel pins. The sodium-bonded carbide fuel pins are currently stored at the Fast Flux Test Facility (FFTF) awaiting shipment to Idaho National Laboratory (INL). Normally, modified contents are included into the next revision of the SARP. However, the contents, identified to be shipped from FFTF to Idaho National Laboratory, are a one-way shipment of 18 irradiated fuel pins and 7 unirradiated fuel pins, where the irradiated and unirradiated fuel pins are shipped separately, and can be authorized with a letter amendment to the existing Certificate of Compliance (CoC).

  14. Assessment of oil-pretreatment technologies to improve performance of reverse-osmosis systems. Technical literature review and technologies evaluation

    SciTech Connect (OSTI)

    Tansel, B.; Villate, J.

    1992-06-19

    The services provided under this contract include both theoretical and experimental research for development of an appropriate technology for treatment of petroleum hydrocarbons in source water for reverse osmosis (RO) systems. This report evaluates and screens the candidate technologies identified during the literature review in accordance with the approved Technology Evaluation Plan. A short-list of technologies that warrant further study is recommended to be carried forward to the experimental phase. The contamination problems due to petroleum hydrocarbons have been long recognized. However, the treatment technologies available for treatment of petroleum contaminated media are still very limited. Major limitations relative to treatment of petroleum hydrocarbons include: exact chemical composition is not defined; aerobic treatment processes are not effective for breaking down heavy petroleum hydrocarbons; anaerobic treatment processes are slow; and physical/chemical treatment processes are expensive and there is usually additional waste produced during treatment of the contaminated media.

  15. Tank waste remediation system retrieval and disposal mission readiness-to-proceed responses to internal independent assessment

    SciTech Connect (OSTI)

    Schaus, P.S.

    1998-01-06

    The US Department of Energy (DOE) is planning to make critical decisions during fiscal year (FY) 1998 regarding privatization contracts for the treatment of Hanford tank waste. Specifically, DOE, Richland Operations Office (RL), will make decisions related to proceeding with Phase 1 Privatization. In support of these decisions, the management and integration (M+I) contractor must be able to meet the requirements to support the Phase 1 privatization contractors. As part of the assessment of the Tank Waste Retrieval (TWR) Readiness-To-Proceed (RTP), an independent review of their process and products was required by the RL letter of August 8, 1997. The Independent Review Team reviewed the adequacy of the planning that has been done by the M+I contractor to validate that, if the plans are carried out, there is reasonable assurance of success. Overall, the RTP Independent Review Team concluded that, if the planning by the M+I contractor team is carried out with adequate funding, there is reasonable assurance that the M+I contractor will be able to deliver waste to the privatization contractor for the duration of Phase 1. This conclusion was based on addressing the recommendations contained in the Independent Review Team`s Final Report and in the individual Criteria and Review Approach (CRA) forms completed during the assessment. The purpose of this report is to formally document the independent assessment and the RTP team responses to the Independent Review Team recommendations. It also provides closure logics for selected recommendations from a Lockheed Martin Hanford Corporation (LMHC) internal assessment of the Technical Basis Review (TBR) packages. This report contains the RTP recommendation closure process (Section 2.0); the closure tables (Section 3.0) which provide traceability between each review team recommendation and its corresponding Project Hanford Management Contract closure logic; and two attachments that formally document the Independent Review Team

  16. Technical Review Report for the Model 9977 Safety Analysis Report for Packaging Addendum 1 Justification for DNDO Contents

    SciTech Connect (OSTI)

    West, M H

    2008-12-17

    The Model 9977 Package is currently certified for Content Envelope C.1, {sup 238}Pu Heat Sources, either in Radioisotope Thermoelectric Generator (RTG), or in Food-Pack Can configurations, under Certificate of Compliance (CoC) Certificate Number 9977 and Package Identification Number USA/9977/B(M)F-96 (DOE). Addendum 1, Justification for DNDO Contents,--the Submittal--supplements Revision 2 of the Safety Analysis Report for Packaging for the Model 9977 Package. The Submittal adds five new contents to the Model 9977 Package, Content Envelopes, AC.1 through AC.5. The Content Envelopes are neptunium metal, the beryllium-reflected plutonium ball (BeRP Ball), plutonium/uranium metal, plutonium/uranium metal with enhanced wt% {sup 240}Pu (to 50 wt%), and uranium metal. The last three Content Envelopes are stabilized to DOE-STD-3013. These Content Envelopes will be shipped to the Device Assembly Facility (DAF) at the Nevada Test Site (NTS), where they will reside, and, hence, to off-site locations in support of the Department of Homeland Security (DHS) Domestic Nuclear Detection Office (DNDO). The new certificate will apply to a limited number of Model 9977 Packages. At the same time, the Submittal requests an extension of the periodic maintenance requirements from one (1) year to up to five (5) years using Radio-Frequency Identification (RFID) temperature-monitoring systems to measure the ambient storage temperature in order to ensure that the temperature of the Viton{reg_sign} O-rings for the 6-inch Containment Vessel (6CV) remain less than 200 F. The RFIDs have been developed by Argonne National Laboratory. An on-going surveillance program at the K-Area Materials Storage (KAMS) facility at the Savannah River Site, and an on-going examination of Viton{reg_sign} O-rings from mock Primary Containment Vessels (PCVs) at Savannah River National Laboratory (SRNL) provide the technical justification for the extension of the periodic maintenance interval. Where extended

  17. Independent Oversight Review of Management of Safety Systems at the Oak Ridge Transuranic Waste Processing Center and Associated Feedback and Improvement Processes, September 2013

    Office of Environmental Management (EM)

    2003 | Department of Energy Y-12 National Security Complex - April 2003 Independent Oversight Inspection, Y-12 National Security Complex - April 2003 April 2003 Inspection of Environment, Safety, and Health Management at the Y-12 National Security Complex This report provides the results of an inspection of environment, safety, and health management at the Department of Energy's (DOE) Y-12 National Security Complex. The inspection was conducted in March and April 2003 by the Office of

  18. Technical management plan for sample generation, analysis, and data review for Phase 2 of the Clinch River Environmental Restoration Program

    SciTech Connect (OSTI)

    Brandt, C.C.; Benson, S.B.; Beeler, D.A.

    1994-03-01

    The Clinch River Remedial Investigation (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the US Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. The remedial investigation is entering Phase 2, which has the following items as its objectives: define the nature and extent of the contamination in areas downstream from the DOE ORR, evaluate the human health and ecological risks posed by these contaminants, and perform preliminary identification and evaluation of potential remediation alternatives. This plan describes the requirements, responsibilities, and roles of personnel during sampling, analysis, and data review for the Clinch River Environmental Restoration Program (CR-ERP). The purpose of the plan is to formalize the process for obtaining analytical services, tracking sampling and analysis documentation, and assessing the overall quality of the CR-ERP data collection program to ensure that it will provide the necessary building blocks for the program decision-making process.

  19. Independent Oversight Review of the Los Alamos Field Office Processes for Laboratory Oversight of Radiological Controls Activity-Level Implementation, March 2014

    Office of Environmental Management (EM)

    Review of the Los Alamos Field Office Processes for Laboratory Oversight of Radiological Controls Activity-Level Implementation May 2011 March 2014 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................ 1 2.0 Scope

  20. Quality Procedure - Independent Assessments | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Assessments Quality Procedure - Independent Assessments This procedure establishes the process for planning, performing, and reporting Independent Assessments (i.e., assist visits, program/project reviews, direct observations, etc.) as conducted by the Office of Standards and Quality Assurance. Independent assessments are performed at EM Headquarters and Field Offices to determine compliance to requirements and to identify systemic issues, potential risk, emerging issues, and for

  1. Independent Cost Review (ICR) and Independent Cost Estimate ...

    Energy Savers [EERE]

    Forms and Templates More Documents & Publications Contractor SOW Template - ICE Statement of Work (SOW) Template (Combined EIRICE Support Contractor) Contractor SOW Template - ICR

  2. Technical information

    Gasoline and Diesel Fuel Update (EIA)

    Home> Commercial Buildings Home> Technical Information > Estimation of Standard Errors Estimation of Standard Errors Sampling error is the difference between the survey estimate...

  3. Technical Review Report for the Model 9978-96 Package Safety Analysis Report for Packaging (S-SARP-G-00002, Revision 1, March 2009)

    SciTech Connect (OSTI)

    West, M

    2009-03-06

    This Technical Review Report (TRR) documents the review, performed by Lawrence Livermore National Laboratory (LLNL) Staff, at the request of the Department of Energy (DOE), on the 'Safety Analysis Report for Packaging (SARP), Model 9978 B(M)F-96', Revision 1, March 2009 (S-SARP-G-00002). The Model 9978 Package complies with 10 CFR 71, and with 'Regulations for the Safe Transport of Radioactive Material-1996 Edition (As Amended, 2000)-Safety Requirements', International Atomic Energy Agency (IAEA) Safety Standards Series No. TS-R-1. The Model 9978 Packaging is designed, analyzed, fabricated, and tested in accordance with Section III of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME B&PVC). The review presented in this TRR was performed using the methods outlined in Revision 3 of the DOE's 'Packaging Review Guide (PRG) for Reviewing Safety Analysis Reports for Packages'. The format of the SARP follows that specified in Revision 2 of the Nuclear Regulatory Commission's Regulatory Guide 7.9, i.e., 'Standard Format and Content of Part 71 Applications for Approval of Packages for Radioactive Material'. Although the two documents are similar in their content, they are not identical. Formatting differences have been noted in this TRR, where appropriate. The Model 9978 Packaging is a single containment package, using a 5-inch containment vessel (5CV). It uses a nominal 35-gallon drum package design. In comparison, the Model 9977 Packaging uses a 6-inch containment vessel (6CV). The Model 9977 and Model 9978 Packagings were developed concurrently, and they were referred to as the General Purpose Fissile Material Package, Version 1 (GPFP). Both packagings use General Plastics FR-3716 polyurethane foam as insulation and as impact limiters. The 5CV is used as the Primary Containment Vessel (PCV) in the Model 9975-96 Packaging. The Model 9975-96 Packaging also has the 6CV as its Secondary Containment Vessel (SCV). In comparison, the Model 9975

  4. Nuclear Waste Assessment System for Technical Evaluation (NUWASTE...

    Office of Environmental Management (EM)

    NWTRB www.nwtrb.gov U.S. Nuclear Waste Technical Review Board U.S. Nuclear Waste Technical Review Board: Roles and Priorities Presented by: Nigel Mote, Executive Director, U.S. ...

  5. Technical Standards Newsletter - October 1999 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1999 Technical Standards Newsletter - October 1999 October 1999 The Standards Forum and Standards Actions, October 1999 The appropriate Technical Standards Managers (TSMs) will provide selected reviewers with copies for comment. The Standards Forum and Standards Actions - October 1999 (318.15 KB) More Documents & Publications Technical Standards Newsletter - October 1999 Technical Standards Newsletter - November 1999 Technical Standards Newsletter - April 2000

  6. Microsoft Word - QER Resilience Metrics - Technical Workshp ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quadrennial Energy Review Technical Workshop on Resilience Metrics for Energy Transmission and Distribution Infrastructure April, 29th, 2014 777 North Capitol St NE Ste 300, ...

  7. Alcohol fuels program technical review

    SciTech Connect (OSTI)

    1981-07-01

    The last issue of the Alcohol Fuels Process R/D Newsletter contained a work breakdown structure (WBS) of the SERI Alcohol Fuels Program that stressed the subcontracted portion of the program and discussed the SERI biotechnology in-house program. This issue shows the WBS for the in-house programs and contains highlights for the remaining in-house tasks, that is, methanol production research, alcohol utilization research, and membrane research. The methanol production research activity consists of two elements: development of a pressurized oxygen gasifier and synthesis of catalytic materials to more efficiently convert synthesis gas to methanol and higher alcohols. A report is included (Finegold et al. 1981) that details the experimental apparatus and recent results obtained from the gasifier. The catalysis research is principally directed toward producing novel organometallic compounds for use as a homogeneous catalyst. The utilization research is directed toward the development of novel engine systems that use pure alcohol for fuel. Reforming methanol and ethanol catalytically to produce H/sub 2/ and CO gas for use as a fuel offers performance and efficiency advantages over burning alcohol directly as fuel in an engine. An application of this approach is also detailed at the end of this section. Another area of utilization is the use of fuel cells in transportation. In-house researchers investigating alternate electrolyte systems are exploring the direct and indirect use of alcohols in fuel cells. A workshop is being organized to explore potential applications of fuel cells in the transportation sector. The membrane research group is equipping to evaluate alcohol/water separation membranes and is also establishing cost estimation and energy utilization figures for use in alcohol plant design.

  8. Sandia Combustion Research: Technical review

    SciTech Connect (OSTI)

    1995-07-01

    This report contains reports from research programs conducted at the Sandia Combustion Research Facility. Research is presented under the following topics: laser based diagnostics; combustion chemistry; reacting flow; combustion in engines and commercial burners; coal combustion; and industrial processing. Individual projects were processed separately for entry onto the DOE databases.

  9. The Waste Treatment Plant External Flowsheet Review (a.k.a. the -Best and Brightest- Review)

    SciTech Connect (OSTI)

    Tamosaitis, W.L.; Gilbert, R.A.; Gerdes, K.D.

    2007-07-01

    With the increasing cost the Hanford Waste Treatment Plant (WTP) Project (hereafter referred to as the Project) and the schedule extending, Department of Energy (DOE) Secretary Samuel Bodman and his staff requested an intensive, independent review of the technical soundness of the WTP flowsheet and a similar review of the Project's estimate at completion (EAC). This input was needed to prepare for the Congressional budgetary reviews to be held in the spring of 2006. A review team consisting of over 50 technical experts was convened to conduct the flowsheet review. This review intensely and openly explored all aspects of the flowsheet for one of the largest projects in the Nation with an estimated cost of about $12B and taking over a decade to go from ground breaking to operation. The review identified 28 issues that needed to be addressed including specific technical issues, systemic issues, and management (contractor and DOE) issues. This intense review was completed on schedule and served as a template for following reviews. This paper describes the planning, approach, and lessons learned from this first-of-a-kind review. (authors)

  10. Application of Engineering and Technical Requirements for DOE...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Application of Engineering and Technical Requirements for DOE Nuclear Facilities Standard Review Plan (SRP) This Standard Review Plan (SRP), Application of Engineering and ...

  11. Southwest Region Experiment Station - Final Technical Report

    SciTech Connect (OSTI)

    Rosenthal, A

    2011-08-19

    Southwest Technology Development Institute (SWTDI), an independent, university-based research institute, has been the operator of the Southwest Region Photovoltaic Experiment Station (SWRES) for almost 30 years. The overarching mission of SWTDI is to position PV systems and solar technologies to become cost-effective, major sources of energy for the United States. Embedded in SWTDI's general mission has been the more-focused mission of the SWRES: to provide value added technical support to the DOE Solar Energy Technologies Program (SETP) to effectively and efficiently meet the R&D needs and targets specified in the SETP Multi-Year Technical Plan. : The DOE/SETP goals of growing U.S. PV manufacturing into giga-watt capacities and seeing tera-watt-hours of solar energy production in the U.S. require an infrastructure that is under development. The staff of the SWRES has supported DOE/SETP through a coherent, integrated program to address infrastructural needs inhibiting wide-scale PV deployment in three major technical categories: specialized engineering services, workforce development, and deployment facilitation. The SWRES contract underwent three major revisions during its five year period-of- performance, but all tasks and deliverables fell within the following task areas: Task 1: PV Systems Assistance Center 1. Develop a Comprehensive multi-year plan 2. Provide technical workforce development materials and workshops for PV stakeholder groups including university, professional installers, inspectors, state energy offices, Federal agencies 3. Serve on the NABCEP exam committee 4. Provide on-demand technical PV system design reviews for U.S. PV stakeholders 5. Provide PV system field testing and instrumentation, technical outreach (including extensive support for the DOE Market Transformation program) Task 2: Design-for-Manufacture PV Systems 1. Develop and install 18 kW parking carport (cost share) and PV-thermal carport (Albuquerque) deriving and publishing

  12. ORISE: Independent verification

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Independent verification ORISE techinician performs environmental scanning The Oak Ridge Institute for Science and Education (ORISE) performs independent environmental assessments and verification to determine the effectiveness of radiological cleanup at decontamination and decommissioning (D&D) projects across the United States. Since 1980, ORISE has performed independent verification at more than 500 sites in 42 states and the District of Columbia. As the primary independent verification

  13. Independent Oversight Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-12-21

    The order prescribes the requirements and responsibilities for the DOE Independent Oversight Program. Supersedes DOE O 227.1.

  14. Technical Assistance to Developers

    SciTech Connect (OSTI)

    Rockward, Tommy; Borup, Rodney L.; Garzon, Fernando H.; Mukundan, Rangachary; Spernjak, Dusan

    2012-07-17

    This task supports the allowance of technical assistance to fuel-cell component and system developers as directed by the DOE. This task includes testing of novel materials and participation in the further development and validation of single cell test protocols. This task also covers technical assistance to DOE Working Groups, the U.S. Council for Automotive Research (USCAR) and the USCAR/DOE Driving Research and Innovation for Vehicle efficiency and Energy sustainability (U.S. Drive) Fuel Cell Technology Team. Assistance includes technical validation of new fuel cell materials and methods, single cell fuel cell testing to support the development of targets and test protocols, and regular advisory participation in other working groups and reviews. This assistance is made available to PEM fuel cell developers by request and DOE Approval. The objectives are to: (1) Support technically, as directed by DOE, fuel cell component and system developers; (2) Assess fuel cell materials and components and give feedback to developers; (3) Assist the DOE Durability Working Group with the development of various new material durability Testing protocols; and (4) Provide support to the U.S. Council for Automotive Research (USCAR) and the USCAR/DOE Fuel Cell Technology Team. FY2012 specific technical objectives are: (1) Evaluate novel MPL materials; (2) Develop of startup/ shutdown protocol; (3) Test the impact of hydrophobic treatment on graphite bi-polar plates; (4) Perform complete diagnostics on metal bi-polar plates for corrosion; and (5) Participate and lead efforts in the DOE Working Groups.

  15. Technical Consultant Report Template

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    TECHNICAL CONSULTING REPORT Page 1 of 1 Report Date Report By: Homeowner Address Consult Type & Date(s) Email / Telephone In Person Purpose(s) of Meeting (generally) Service(s) Undertaken Observations Recommendations a. Visual Inspection Attic Basement / Crawlspace Equipment Other b. Diagnostic Testing Blower Door Combustion Testing Other c. Written Materials Review Audit Report Proposal Other d. Other NOTE: This Report was prepared at the request of the Homeowner, based on information

  16. BES Requirements Review 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BES Requirements Review 2014 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR Requirements Review 2015 Previous Reviews HEP/NP Requirements Review 2013 FES Requirements Review 2014 BES Requirements Review 2014 BES Attendees 2014 Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1

  17. FES Requirements Review 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FES Requirements Review 2014 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR Requirements Review 2015 Previous Reviews HEP/NP Requirements Review 2013 FES Requirements Review 2014 FES Attendees 2014 BES Requirements Review 2014 Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1

  18. Technical Publications by Type and Energy System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technical Publications by Type and Energy System Technical Publications by Type and Energy System Find sourcebooks, tip sheets, technical fact sheets, market assessments, case studies, and topical presentations to help your plant improve energy efficiency. Technical publications are available for the energy systems listed on the right. The publication types are described below. Also review our databases. Technical Publications Technical Publications include Sourcebooks, Handbooks, Market

  19. Independent Oversight Inspection, East Tennessee Technology Park, Summary

    Office of Environmental Management (EM)

    - January 2012 | Department of Energy Review, Savannah River National Laboratory - January 2012 Independent Oversight Follow-up Review, Savannah River National Laboratory - January 2012 January 2012 Follow-up Review of Implementation Verification Reviews at the Savannah River National Laboratory Savannah River Site This report provides the results of an independent review of the identification and implementation of safety basis hazard controls associated with "flashing spray

  20. Independent Oversight Review, Pacific Northwest National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    conducted May 15-17, 2012, at the Department of Energy's (DOE) Pacific Northwest National Laboratory by the DOE Office of Safety and Emergency Management Evaluations, which is...

  1. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant...

    Office of Environmental Management (EM)

    selected aspects of the work planning and control process being implemented by the Portsmouth Gaseous Diffusion Plant (PORTS) contractor, Fluor-Babcock & Wilcox Portsmouth (FBP). ...

  2. External Independent Review (EIR) Standard Operating Procedure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The purpose is to provide the Acquisition Executive and senior leadership within the Department of Energy, as well as Congress confidence, with minimal bias, that the project can ...

  3. EXTERNAL INDEPENDENT REVIEW (EIR) STANDARD OPERATING PROCEDURES...

    Energy Savers [EERE]

    ... quality assurance, sustainability, and environmental, ... with project team success metrics? Are there appropriate ... and well-informed of DOE policy and guidance? Does the ...

  4. Independent Oversight Review, Nevada National Security Site,...

    Broader source: Energy.gov (indexed) [DOE]

    of Federal Assurance Capability at the Nevada National Security Site This report ... systems at the Nevada National Security Site (NNSS) Device Assembly Facility (DAF). ...

  5. Background Information for Independent Review Team. Lifecycle...

    Office of Scientific and Technical Information (OSTI)

    Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States) Publication Date: 2014-10-24 OSTI Identifier: 1178415 Report Number(s): LLNL-TR--663374 DOE Contract Number: ...

  6. EXTERNAL INDEPENDENT REVIEW (EIR) STANDARD OPERATING PROCEDURES...

    Broader source: Energy.gov (indexed) [DOE]

    ... This information is used by PM analysts to forecast when a project will require an EIR. Detailed planning information is maintained in PARS II on any EIR that is forecast to occur ...

  7. Radiography Facility - Building 239 Independent Validation Review...

    Office of Scientific and Technical Information (OSTI)

    Visit OSTI to utilize additional information resources in energy science and technology. A ... establish the ability of TSR LCO, administrative control or safety management program ...

  8. EXTERNAL INDEPENDENT REVIEW (EIR) STANDARD OPERATING PROCEDURES...

    Broader source: Energy.gov (indexed) [DOE]

    This would include the development of realistic budgets and schedules, and the consistent definition, development, and use of management reserve and contingency. (7) Have relevant...

  9. EXTERNAL INDEPENDENT REVIEW (EIR) STANDARD OPERATING PROCEDURES...

    Broader source: Energy.gov (indexed) [DOE]

    and other regulatory decisions. Ensure that the design addresses results of reliability, availability, maintainability, and -inspectability (RAMI) analyses. Preliminary Design...

  10. Independent Oversight Inspection, East Tennessee Technology Park - November

    Office of Environmental Management (EM)

    Department of Energy Hanford Site - January 2014 Independent Oversight Follow-up Review, Hanford Site - January 2014 January 2014 Follow-up Review of the Hanford Site Chronic Beryllium Disease Prevention Program The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent follow-up review of corrective actions taken to improve the Hanford Site chronic beryllium disease

  11. Independent Statistics & Analysis

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    monthly data for smaller electric power plants that are excluded from the monthly filing ... independent power producers, and electric utility combined heat and power plants. ...

  12. Independent Oversight Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-08-30

    The order prescribes the requirements and responsibilities for the DOE Independent Oversight Program. Cancels DOE O 470.2B. Superseded by DOE O 227.1A.

  13. 1000 Independence Avenue, SW

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    office of small & disadvantaged business utilization 1000 Independence Avenue, SW ... and Disposal office of small & disadvantaged business utilization what does doe purchase? ...

  14. Independent Statistics & Analysis

    U.S. Energy Information Administration (EIA) Indexed Site

    October 2014 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 Quarterly Coal Distribution Report April - June 2014 This report was...

  15. Housing and Building Energy Efficiency Technical Assistance | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Housing and Building Energy Efficiency Technical Assistance Housing and Building Energy Efficiency Technical Assistance Housing and building energy efficiency technical assistance is designed to assist Indian tribes in creating more efficient homes and buildings. Assistance options include building design review, building code creation, building inventory and assessment, and weatherization program design. To apply for housing and building energy efficiency technical assistance,

  16. Independent Activity Report, Los Alamos National Security - June...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Activity Report, Los Alamos National Security - June 2011 June 2011 Review of the Los Alamos National Security Emergency Operations Division Emergency Management ...

  17. Independent Oversight Activity Report, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Los Alamos National Laboratory - February 12, 2014 Independent Oversight Activity Report, Los Alamos National Laboratory - February 12, 2014 February 2014 Review of Corrective ...

  18. Enterprise Assessments Targeted Review, Idaho National Laboratory...

    Office of Environmental Management (EM)

    Health Assessments, conducted an independent review of the Idaho National Laboratory ... The independent review of the IMCL facility was performed at the Idaho Site from April 28 ...

  19. Review of the Pantex Plant Implementation Verification Review...

    Energy Savers [EERE]

    for Improvement PXSO Pantex Site Office SAC Specific Administrative Control SSC Structures, Systems, and Components TSR Technical Safety Requirement 1 Independent Oversight...

  20. Technical Standards Managers

    Broader source: Energy.gov (indexed) [DOE]

    FACILITYADDRESS LOC CODE DOE TECHNICAL STANDARD MANAGERS AU-30 DOE Technical Standards ... FACILITYADDRESS LOC CODE DOE TECHNICAL STANDARD MANAGERS DOE-CTA TSM Gustave E. (Bud) ...

  1. Hanford ETR- Tank Waste Treatment and Immobilization Plant- Hanford Tank Waste Treatment and Immobilization Plant Technical Review- Estimate at Completion (Cost) Report

    Broader source: Energy.gov [DOE]

    This is a comprehensive review of the Hanford WTP estimate at completion - assessing the project scope, contract requirements, management execution plant, schedule, cost estimates, and risks.

  2. DuPont Chemical Vapor Technical Report

    SciTech Connect (OSTI)

    MOORE, T.L.

    2003-10-03

    DuPont Safety Resources was tasked with reviewing the current chemical vapor control practices and providing preventive recommendations on best commercial techniques to control worker exposures. The increased focus of the tank closure project to meet the 2024 Tri-Party Agreement (TPA) milestones has surfaced concerns among some CH2MHill employees and other interested parties. CH2MHill is committed to providing a safe working environment for employees and desires to safely manage the tank farm operations using appropriate control measures. To address worker concerns, CH2MHill has chartered a ''Chemical Vapors Project'' to integrate the activities of multiple CH2MHill project teams, and solicit the expertise of external resources, including an independent Industrial Hygiene expert panel, a communications consultant, and DuPont Safety Resources. Over a three-month time period, DuPont worked with CH2MHill ESH&Q, Industrial Hygiene, Engineering, and the independent expert panel to perform the assessment. The process included overview presentations, formal interviews, informal discussions, documentation review, and literature review. DuPont Safety Resources concluded that it is highly unlikely that workers in the tank farms are exposed to chemicals above established standards. Additionally, the conventional and radiological chemistry is understood, the inherent chemical hazards are known, and the risk associated with chemical vapor exposure is properly managed. The assessment highlighted management's commitment to addressing chemical vapor hazards and controlling the associated risks. Additionally, we found the Industrial Hygiene staff to be technically competent and well motivated. The tank characterization data resides in a comprehensive database containing the tank chemical compositions and relevant airborne concentrations.

  3. Technical information

    U.S. Energy Information Administration (EIA) Indexed Site

    level, as well as the State level, in several EIA reports, including the State Energy Data Report (SEDR) and the Monthly Energy Review (MER). When the CBECS totals are...

  4. Data Machine Independence

    Energy Science and Technology Software Center (OSTI)

    1994-12-30

    Data-machine independence achieved by using four technologies (ASN.1, XDR, SDS, and ZEBRA) has been evaluated by encoding two different applications in each of the above; and their results compared against the standard programming method using C.

  5. 2008 annual merit review

    SciTech Connect (OSTI)

    None, None

    2009-01-18

    The 2008 DOE Vehicle Technologies Program Annual Merit Review was held February 25-28, 2008 in Bethesda, Maryland. The review encompassed all of the work done by the Vehicle Technologies Program: a total of 280 individual activities were reviewed, by a total of just over 100 reviewers. A total of 1,908 individual review responses were received for the technical reviews, and an additional 29 individual review responses were received for the plenary session review.

  6. Technical Interpretation, NSTI 2003-01 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interpretation, NSTI 2003-01 Technical Interpretation, NSTI 2003-01 December 3, 2003 Technical Interpretation Regarding Department of Energy Reviews and Approvals of Safety Programs Technical Interpretation 2003-01 concerns Department of Energy Orders and Regulations for review and approval of the underlying scope, methods, and approaches to implement the Order requirements. Technical Interpretation, NSTI 2003-01 (189.73 KB) More Documents & Publications DOE O 420.1B/1C Crosswalk Matrix

  7. Independent Statistics & Analysis

    U.S. Energy Information Administration (EIA) Indexed Site

    August 2016 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 Quarterly Coal Distribution Report October - December 2015 This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this report therefore

  8. Independent Statistics & Analysis

    U.S. Energy Information Administration (EIA) Indexed Site

    Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 Quarterly Coal Report (Abbreviated) January - March 2016 June 2016 This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this report therefore should

  9. Vehicle Technologies Office Merit Review 2015: Fuel Economy Information Project- Research, Data Validation, and Technical Assistance Related to Collecting, Analyzing, and Disseminating Accurate Fuel Economy Information

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presentation given by Oak Ridge National Laboratory at 2015 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about fuel economy...

  10. Review of state-of-the-art of solar collector corrosion processes. Task 1 of solar collector studies for solar heating and cooling applications. Final technical progress report

    SciTech Connect (OSTI)

    Clifford, J E; Diegle, R B

    1980-04-11

    The state-of-the-art of solar collector corrosion processes is reviewed, and Task 1 of a current research program on use of aqueous heat transfer fluids for solar heating and cooling is summarized. The review of available published literature has indicated that lack of quantitative information exists relative to collector corrosion at the present time, particularly for the higher temperature applications of solar heating and cooling compared to domestic water heating. Solar collector systems are reviewed from the corrosion/service life viewpoint, with emphasis on various applications, collector design, heat transfer fluids, and freeze protection methods. Available information (mostly qualitative) on collector corrosion technology is reviewed to indicate potential corrosion problem areas and corrosion prevention practices. Sources of limited quantitative data that are reviewed are current solar applications, research programs on collector corrosion, and pertinent experience in related applications of automotive cooling and non-solar heating and cooling. A data bank was developed to catalog corrosion information. Appendix A of this report is a bibliography of the data bank, with abstracts reproduced from presently available literature accessions (about 220). This report is presented as a descriptive summary of information that is contained in the data bank.

  11. Independent Oversight Activity Report, Hanford Sludge Treatment Project – September 2013

    Broader source: Energy.gov [DOE]

    Hanford Sludge Treatment Project Engineered Container Retrieval and Transfer System Operational Awareness Review and Sludge Treatment Project Independent Project Review [HIAR-RL-2013-09-18

  12. Total energy cycle assessment of electric and conventional vehicles: an energy and environmental analysis. Volume 4: peer review comments on technical report

    SciTech Connect (OSTI)

    1998-01-01

    This report compares the energy use, oil use and emissions of electric vehicles (EVs) with those of conventional, gasoline-powered vehicles (CVs) over the total life cycle of the vehicles. The various stages included in the vehicles` life cycles include vehicle manufacture, fuel production, and vehicle operation. Disposal is not included. An inventory of the air emissions associated with each stage of the life cycle is estimated. Water pollutants and solid wastes are reported for individual processes, but no comprehensive inventory is developed. Volume IV includes copies of all the external peer review comments on the report distributed for review in July 1997.

  13. Project Impact Assessments: Building America FY14 Field Test Technical

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Support - 2014 BTO Peer Review | Department of Energy Project Impact Assessments: Building America FY14 Field Test Technical Support - 2014 BTO Peer Review Project Impact Assessments: Building America FY14 Field Test Technical Support - 2014 BTO Peer Review Presenter: Lieko Earle, National Renewable Energy Laboratory The goal of this project is for the National Renewable Energy Laboratory to provide extensive, hands-on technical support to Building America teams in the areas of experiment

  14. Sandia National Laboratories Technical Assistance - DOE Laboratory...

    Energy Savers [EERE]

    Project Review October 18, 2004 Sandra Begay-Campbell Principal Member of the Technical ... Contact Information Sandra Begay-Campbell Sandia National Laboratories (505) ...

  15. CRAD, New Nuclear Facility Documented Safety Analysis and Technical...

    Broader source: Energy.gov (indexed) [DOE]

    December 2, 2014 New Nuclear Facility Documented Safety Analysis and Technical Safety Requirements Criteria Review and Approach Document (EA CRAD 31-07, Rev. 0) CRAD, New Nuclear...

  16. Technical Assessment: Cryo-Compressed Hydrogen Storage for Vehicular...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cryo-Compressed Hydrogen Storage: Performance and Cost Review Technical Assessment of Cryo-Compressed Hydrogen Storage Tank Systems for Automotive Applications High-Pressure Tube ...

  17. Audit of the Department of Energy's Scientific and Technical...

    Office of Environmental Management (EM)

    ... of scientific and technical information statistics during its reviews at field activities. ... scientific efforts to clean up the environment, pursue basic research, develop ...

  18. Reviews and Validations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reviews and Validations Reviews and Validations External Independent Review (EIR) Procedures Under DOE O 413.3B, Program and Project Management for the Acquisition of Capital ...

  19. Improvements to Technical Specifications surveillance requirements

    SciTech Connect (OSTI)

    Lobel, R.; Tjader, T.R.

    1992-12-01

    In August 1983 an NRC task group was formed to investigate problems with surveillance testing required by Technical Specifications, and to recommend approaches to effect improvements. NUREG-1024 ( Technical Specifications-Enhancing Safety Impact'') resulted, and it contained recommendations to review the basis for test frequencies; to ensure that the tests promote safety and do not degrade equipment; and to review surveillance tests so that they do not unnecessarily burden personnel. The Technical Specifications Improvement Program (TSIP) was established in December 1984 to provide the framework for rewriting and improving the Technical Specifications. As an element of the TSIP, all Technical Specifications surveillance requirements were comprehensively examined as recommended in NUREG-1024. The results of that effort are presented in this report. The study found that while some testing at power is essential to verify equipment and system operability, safety can be improved, equipment degradation decreased, and unnecessary personnel burden relaxed by reducing the amount of testing at power.

  20. Review Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 4, 2014 Independent Oversight Review, Bonneville Power Administration Safety Management Program - March 2014 Oversight Review of the Bonneville Power Administration Safety...

  1. Independent Cost Estimate (ICE)

    Broader source: Energy.gov [DOE]

    Independent Cost Estimate (ICE). On August 8-12, the Office of Project Management Oversight and Assessments (PM) will conduct an ICE on the NNSA Albuquerque Complex Project (NACP) at Albuquerque, NM. This estimate will support the Critical Decision (CD) for establishing the performance baseline and approval to start construction (CD-2/3). This project is at CD-1, with a total project cost range of $183M to $251M.

  2. 1000 Independence Avenue, SW

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    office of small & disadvantaged business utilization 1000 Independence Avenue, SW Washington, DC 20585 202.586.7377 www.smallbusiness.energy.gov the department purchases a wide variety of goods and services, including, but not limited to: 202.586.7377 www.smallbusiness.energy.gov DOE/SB-0002 * Remediation * Facility Management * Construction * R&D * Management/Scientific Consultation and Analysis * Administrative Services * IT and Data Processing * Security * Engineering * Waste

  3. The independent verification process in decommissioning, decontamination, and reutilization activities - description, benefits, and lessons learned

    SciTech Connect (OSTI)

    Egidi, P.V.

    1997-06-01

    Oak Ridge National Laboratory Environmental Technology Section has been performing Independent Verification (IV) activities for U.S. DOE sites since 1986. DOE has successfully used IV in the Uranium Mill Tailings Remedial Action Program, Decontamination and Decommissioning projects, and Formerly Utilized Sites Remedial Action Projects/Surplus Facilities Management Program. Projects that have undergone IV range from small residential properties to large, industrial sites. The IV process provides a third-party review conducted by an independent organization. The purpose is to verify accuracy and completeness of contractor field measurements and final documentation, evaluate the credibility of procedures, and independently assess post-cleanup conditions versus decommissioning project plans and release criteria. Document reviews of plans, dose models, procedures, and reports are some IV activities undertaken. Independent measurements are also collected during field visits to confirm the contractor`s findings. Corrective actions for discrepancies are suggested if necessary. Finally, archival and reporting of the final site environmental conditions for project closeout and certification are completed. The IV contractor reports to DOE headquarters and acts as a quality assurance feedback mechanism. An IV also provides additional assurance that projects are planned, carried out, and documented properly. Decommissioning projects benefit from the IV process by: (1) cost and time savings from early identification of potential problems, (2) assurance that cleanup meets regulatory guidelines, and (3) technical reviews and consultation with experts in field instrumentation, sampling strategy, etc. Some lessons learned from the IV process include avoiding: (1) improper survey techniques, (2) reporting data in units not comparable with guideline values, (3) premature release of surfaces, (4) poor decommissioning project planning, (5) misapplication of release guidelines. 20 refs.

  4. Two stage fluid bed-plasma gasification process for solid waste valorisation: Technical review and preliminary thermodynamic modelling of sulphur emissions

    SciTech Connect (OSTI)

    Morrin, Shane; Lettieri, Paola; Chapman, Chris; Mazzei, Luca

    2012-04-15

    Highlights: Black-Right-Pointing-Pointer We investigate sulphur during MSW gasification within a fluid bed-plasma process. Black-Right-Pointing-Pointer We review the literature on the feed, sulphur and process principles therein. Black-Right-Pointing-Pointer The need for research in this area was identified. Black-Right-Pointing-Pointer We perform thermodynamic modelling of the fluid bed stage. Black-Right-Pointing-Pointer Initial findings indicate the prominence of solid phase sulphur. - Abstract: Gasification of solid waste for energy has significant potential given an abundant feed supply and strong policy drivers. Nonetheless, significant ambiguities in the knowledge base are apparent. Consequently this study investigates sulphur mechanisms within a novel two stage fluid bed-plasma gasification process. This paper includes a detailed review of gasification and plasma fundamentals in relation to the specific process, along with insight on MSW based feedstock properties and sulphur pollutant therein. As a first step to understanding sulphur partitioning and speciation within the process, thermodynamic modelling of the fluid bed stage has been performed. Preliminary findings, supported by plant experience, indicate the prominence of solid phase sulphur species (as opposed to H{sub 2}S) - Na and K based species in particular. Work is underway to further investigate and validate this.

  5. Independent Safety Evaluation of the MFF-2 test (HK192)

    SciTech Connect (OSTI)

    Van Keuren, J.C.

    1988-06-01

    This document gives the results of the Independent Safety Evaluation (ISE) of the MFF-2 fuel assembly in accordance with the requirements of EI-501. Information on the test design has been taken from the test documents, but independent calculations of the safety related parameters of the test have been made. This report considers seven basic areas: Technical Specification Considerations, Steady State Operation, Transient Operation, HCDA Considerations, Failure Analyses, Stress and Seismic, Criticality and Test Handling Considerations. 25 refs., 1 fig., 5 tabs.

  6. Technical Report - FINAL

    SciTech Connect (OSTI)

    Barbara Luke, Director, UNLV Engineering Geophysics Laboratory

    2007-04-25

    Improve understanding of the earthquake hazard in the Las Vegas Valley and to assess the state of preparedness of the area's population and structures for the next big earthquake. 1. Enhance the seismic monitoring network in the Las Vegas Valley 2. Improve understanding of deep basin structure through active-source seismic refraction and reflection testing 3. Improve understanding of dynamic response of shallow sediments through seismic testing and correlations with lithology 4. Develop credible earthquake scenarios by laboratory and field studies, literature review and analyses 5. Refine ground motion expectations around the Las Vegas Valley through simulations 6. Assess current building standards in light of improved understanding of hazards 7. Perform risk assessment for structures and infrastructures, with emphasis on lifelines and critical structures 8. Encourage and facilitate broad and open technical interchange regarding earthquake safety in southern Nevada and efforts to inform citizens of earthquake hazards and mitigation opportunities

  7. US DRIVE Fuel Cell Technical Team Roadmap | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fuel Cell Technical Team Roadmap US DRIVE Fuel Cell Technical Team Roadmap The Fuel Cell Technical Team (FCTT) conducts the following activities: (1) Reviews and evaluates materials and systems research regarding fuel cells for light-duty vehicles and provides feedback to the U.S. Department of Energy (DOE) and Partnership stakeholders, (2) Generates goals and performance targets for fuel cells for automotive applications, (3) Collaborates with other technical teams and assists the Partnership

  8. DEMONSTRATION BULK VITRIFICATION SYSTEM (DBVS) EXTERNAL REVIEW

    SciTech Connect (OSTI)

    HONEYMAN, J.O.

    2007-02-08

    The Hanford mission to retrieve and immobilize 53 million gallons of radioactive waste from 177 underground storage tanks will be accomplished using a combination of processing by the waste treatment plant currently under construction, and a supplemental treatment that would process low-activity waste. Under consideration for this treatment is bulk vitrification, a versatile joule-heated melter technology which could be deployed in the tank farms. The Department proposes to demonstrate this technology under a Research, Development and Demonstration (RD and D) permit issued by the Washington State Department of Ecology using both non-radioactive simulant and blends of actual tank waste. From the demonstration program, data would be obtained on cost and technical performance to enable a decision on the potential use of bulk vitrification as the supplemental treatment technology for Hanford. An independent review by sixteen subject matter experts was conducted to assure that the technical basis of the demonstration facility design would be adequate to meet the objectives of the Demonstration Bulk Vitrification System (DBVS) program. This review explored all aspects of the program, including flowsheet chemistry, project risk, vitrification, equipment design and nuclear safety, and was carried out at a time when issues can be identified and corrected. This paper describes the mission need, review approach, technical recommendations and follow-on activities for the DBVS program.

  9. A technical review of non-destructive assay research for the characterization of spent nuclear fuel assemblies being conducted under the US DOE NGSI

    SciTech Connect (OSTI)

    Croft, Stephen; Tobin, Stephen J

    2010-12-06

    There is a growing belief that expansion of nuclear energy generation will be needed in the coming decades as part of a mixed supply chain to meet global energy demand. At stake is the health of the economic engine that delivers human prosperity. As a consequence renewed interest is being paid to the safe management of spent nuclear fuel (SNF) and the plutonium it contains. In addition to being an economically valuable resource because it can be used to construct explosive devices, Pu must be placed on an inventory and handled securely. A multiinstitutional team of diverse specialists has been assembled under a project funded by the US Department of Energy (DOE) Next Generation Safeguards Initiative (NGSI) to address ways to nondestructively quantify the plutonium content of spent nuclear fuel assemblies, and to also detect the potential diversion of pins from those assemblies. Studies are underway using mostly Monte Carlo tools to assess the feasibility, individual and collective performance capability of some fourteen nondestructive assay methods. Some of the methods are familiar but are being applied in a new way against a challenging target which is being represented with a higher degree of realism in simulation space than has been done before, while other methods are novel. In this work we provide a brief review of the techniques being studied and highlight the main achievements to date. We also draw attention to the deficiencies identified in for example modeling capability and available basic nuclear data. We conclude that this is an exciting time to be working in the NDA field and that much work, both fundamental and applied, remains ahead if we are to advance the state of the practice to meet the challenges posed to domestic and international safeguards by the expansion of nuclear energy together with the emergence of alternative fuel cycles.

  10. Frame independent cosmological perturbations

    SciTech Connect (OSTI)

    Prokopec, Tomislav; Weenink, Jan E-mail: j.g.weenink@uu.nl

    2013-09-01

    We compute the third order gauge invariant action for scalar-graviton interactions in the Jordan frame. We demonstrate that the gauge invariant action for scalar and tensor perturbations on one physical hypersurface only differs from that on another physical hypersurface via terms proportional to the equation of motion and boundary terms, such that the evolution of non-Gaussianity may be called unique. Moreover, we demonstrate that the gauge invariant curvature perturbation and graviton on uniform field hypersurfaces in the Jordan frame are equal to their counterparts in the Einstein frame. These frame independent perturbations are therefore particularly useful in relating results in different frames at the perturbative level. On the other hand, the field perturbation and graviton on uniform curvature hypersurfaces in the Jordan and Einstein frame are non-linearly related, as are their corresponding actions and n-point functions.

  11. Technical Standards, CFAST-Code Guidance - July 23, 2004 | Department of

    Office of Environmental Management (EM)

    9 Technical Standards Newsletter - October 1999 October 1999 The Standards Forum and Standards Actions, October 1999 The appropriate Technical Standards Managers (TSMs) will provide selected reviewers with copies for comment. The Standards Forum and Standards Actions - October 1999 (318.15 KB) More Documents & Publications Technical Standards Newsletter - October 1999 Technical Standards Newsletter - November 1999 Technical Standards Newsletter - April 2000

    1 Technical Standards

  12. Northeast Feedstock Supply Technical and Economica (Technical...

    Office of Scientific and Technical Information (OSTI)

    Northeast Feedstock Supply Technical and Economica Citation Details In-Document Search ... This in-depth analysis considers the current and f Authors: Corrie Nichol ; Kara Cafferty ...

  13. 1-10 kW Stationary Combined Heat and Power Systems Status and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Technical Potential: Independent Review 1-10 kW Stationary Combined Heat and Power Systems Status and Technical Potential: Independent Review This independent review ...

  14. Electricity Policy Technical Assistance Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Electricity Policy Technical Assistance Program Overview Since 2003, the U.S. Department of Energy's Office of Electricity Delivery and Energy Reliability (OE) has been providing independent and unbiased technical support to states, regions, and Tribes on their electricity-related policies through its Electricity Policy Technical Assistance Program. The scope of OE's assistance is determined by the requests received. Types of assistance offered and activities supported include: Analysis

  15. Independent Oversight Assessment, Los Alamos National Laboratory - April

    Office of Environmental Management (EM)

    HSS Independent Activity Report - Rev. 0 Report Number: HIAR LANL-2014-02-12 Site: Los Alamos National Laboratory (LANL) Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for Review of Corrective Actions for Findings from the Independent Oversight Review of LANL Radiological Controls Activity-Level Implementation (Published November 2013) Dates of Activity : 02/12/2014 Report Preparer: Robert Freeman, Nuclear Engineer Activity

  16. Standard Review Plan Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technical Framework for EM Projects Critical Decision (CD) Milestones Review & Approval Standard Review Plan (SRP) E n v i r o n m e n t a l M a n a g e m e n t DOE - EM - SRP - 2010 2nd Edition Overview March 2010 This page intentionally left blank. Standard Review Plan, 2 nd Edition, March 2010 1 Standard Review Plan Overview Technical Framework for EM Projects Critical Decision Milestones Review and Approval The Office of Environmental Management (EM) is responsible for managing the

  17. Technical Area 21

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Technical Area 21 Technical Area 21 Technical Area 21 was the site of chemical research for refining plutonium and plutonium metal production from 1945 to 1978. August 1, 2013 Technical Area 21 in 2011 Technical Area 21 in 2011 Technical Area 21 (TA-21), also known as DP Site was the site of chemical research for refining plutonium and plutonium metal production from 1945 to 1978. Between 2008 and 2011, MDAs B, U, and V were excavated and removed. 24 buildings were demolished in 2010 and 2011

  18. International Linear Collider-A Technical Progress Report (Technical...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: International Linear Collider-A Technical Progress Report Citation Details In-Document Search Title: International Linear Collider-A Technical Progress Report The ...

  19. NASA technical baseline

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Twitter Google + Vimeo GovDelivery SlideShare SunShot Grand Challenge: Regional Test Centers NASA technical baseline HomeTag:NASA technical baseline Curiosity's multi-mission ...

  20. Federal Technical Capability Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-05-18

    Provides requirements and responsibilities to ensure recruitment and hiring of technically capable personnel to retain critical technical capabilities within the Department at all times. Cancels DOE M 426.1-1. Canceled by DOE O 426.1.