  1. Independent Oversight Special Review, Rocky Flats Closure Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rocky Flats Closure Project Site - April 2001 Independent Oversight Special Review, Rocky Flats Closure Project Site - April 2001 April 2001 Special Review of the Rocky Flats...

  2. Independent Oversight Review, West Valley Demonstration Project...

    Office of Environmental Management (EM)

    Assessments Review, West Valley Demonstration Project - December 2014 EA-1552: Final Environmental Assessment 3Q CY2005 (PDF), Facility Representative Program Performance...

  3. Independent Oversight Special Review, Rocky Flats Closure Project Site -

    Office of Environmental Management (EM)

    April 2001 | Department of Energy Rocky Flats Closure Project Site - April 2001 Independent Oversight Special Review, Rocky Flats Closure Project Site - April 2001 April 2001 Special Review of the Rocky Flats Closure Project Site This report provides the results of a Special Review at the Rocky Flats Closure Project that was performed U.S. Department of Energy's (DOE) Office of Independent Environment, Safety, and Health Oversight. The Special Review was conducted in February and March 2001

  4. Independent Oversight Review, Portsmouth/Paducah Project Office - May 2012

    Office of Environmental Management (EM)

    | Department of Energy Portsmouth/Paducah Project Office - May 2012 Independent Oversight Review, Portsmouth/Paducah Project Office - May 2012 May 2012 Review of the Department of Energy Office of Environmental Management Assessment of the Portsmouth/Paducah Project Office Oversight of the Portsmouth Gaseous Diffusion Plant Criticality Safety Program This report provides the results of an independent review of the Department of Energy's (DOE) Headquarters Office of Environmental Management

  5. Independent Oversight Review, Idaho Cleanup Project - August 2014 |

    Office of Environmental Management (EM)

    Department of Energy Cleanup Project - August 2014 Independent Oversight Review, Idaho Cleanup Project - August 2014 August 2014 The U.S. Department of Energy?s (DOE) Office of Environment, Safety and Health Assessments, within the DOE Office of Independent Enterprise Assessments (IEA) (formerly the Office of Health, Safety and Security), conducted an independent oversight review of the Integrated Waste Treatment facility contractor readiness assessment (C-RA) at the Idaho Site from January

  6. Independent Oversight Review, Portsmouth/Paducah Project Office...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of the PortsmouthPaducah Project Office Oversight of the Portsmouth Gaseous Diffusion Plant Criticality Safety Program This report provides the results of an independent...

  7. Independent Oversight Review, Advanced Mixed Waste Treatment Project- April 2013

    Broader source: Energy.gov [DOE]

    Review of Radiation Protection Program Implementation at the Advanced Mixed Waste Treatment Project of the Idaho Site

  8. Independent Oversight Review, West Valley Demonstration Project Transportation- September 2000

    Broader source: Energy.gov [DOE]

    Transportation Emergency Management Review of the West Valley Demonstration Project (WVDP) and National Transportation Program (NTP)/Transportation Compliance Evaluation/Assistance Program (TCEAP)

  9. Independent Oversight Review, Sodium Bearing Waste Treatment Project- Federal- June 2012

    Broader source: Energy.gov [DOE]

    Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Unit Federal Operational Readiness Review

  10. Independent Oversight Review, Sodium Bearing Waste Treatment Project- Contractor- June 2012

    Broader source: Energy.gov [DOE]

    Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Unit Contractor Operational Readiness Review

  11. Independent Peer Reviews

    SciTech Connect (OSTI)

    2012-03-16

    Independent Assessments: DOE's Systems Integrator convenes independent technical reviews to gauge progress toward meeting specific technical targets and to provide technical information necessary for key decisions.

  12. Independent Oversight Review, Sodium Bearing Waste Treatment...

    Office of Environmental Management (EM)

    Contractor - June 2012 Independent Oversight Review, Sodium Bearing Waste Treatment Project - Contractor - June 2012 June 2012 Review of the Sodium Bearing Waste Treatment Project...

  13. Independent Oversight Review, Advanced Mixed Waste Treatment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Advanced Mixed Waste Treatment Project - April 2013 Independent Oversight Review, Advanced Mixed Waste Treatment Project - April 2013 April 2013 Review of Radiation Protection...

  14. Review of the independent risk assessment of the proposed Cabrillo liquified natural gas deepwater port project.

    SciTech Connect (OSTI)

    Gritzo, Louis Alan; Hightower, Marion Michael; Covan, John Morgan; Luketa-Hanlin, Anay Josephine

    2006-01-01

    In March 2005, the United States Coast Guard requested that Sandia National Laboratories provide a technical review and evaluation of the appropriateness and completeness of models, assumptions, analyses, and risk management options presented in the Cabrillo Port LNG Deepwater Port Independent Risk Assessment-Revision 1 (Cabrillo Port IRA). The goal of Sandia's technical evaluation of the Cabrillo Port IRA was to assist the Coast Guard in ensuring that the hazards to the public and property from a potential LNG spill during transfer, storage, and regasification operations were appropriately evaluated and estimated. Sandia was asked to review and evaluate the Cabrillo Port IRA results relative to the risk and safety analysis framework developed in the recent Sandia report, ''Guidance on Risk Analysis and Safety Implications of a Large Liquefied Natural Gas (LNG) Spill over Water''. That report provides a framework for assessing hazards and identifying approaches to minimize the consequences to people and property from an LNG spill over water. This report summarizes the results of the Sandia review of the Cabrillo Port IRA and supporting analyses. Based on our initial review, additional threat and hazard analyses, consequence modeling, and process safety considerations were suggested. The additional analyses recommended were conducted by the Cabrillo Port IRA authors in cooperation with Sandia and a technical review panel composed of representatives from the Coast Guard and the California State Lands Commission. The results from the additional analyses improved the understanding and confidence in the potential hazards and consequences to people and property from the proposed Cabrillo Port LNG Deepwater Port Project. The results of the Sandia review, the additional analyses and evaluations conducted, and the resolutions of suggested changes for inclusion in a final Cabrillo Port IRA are summarized in this report.

  15. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Independent Oversight Review, Waste Treatment and Immobilization Plant - March 2012 March 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant Project...

  16. Independent Oversight Review, Sodium Bearing Waste Treatment...

    Broader source: Energy.gov (indexed) [DOE]

    report documents the results of an independent review of the Sodium Bearing Waste Treatment Project-Integrated Waste Treatment Unit Federal Operational Readiness Review. The...

  17. River Protection Project (RPP) Readiness to Proceed 2 Internal Independent Review Team Final Report

    SciTech Connect (OSTI)

    SCHAUS, P.S.

    2000-03-29

    This report describes the results of an independent review team brought in to assess CH2M Hill Hanford Group's readiness and ability to support the RPP's move into its next major phase - retrieval and delivery of tank waste to the Privatization Contractor

  18. Independent Oversight Review, Waste Treatment and Immobilization...

    Broader source: Energy.gov (indexed) [DOE]

    Hanford Site Waste Treatment and Immobilization Plant Project Construction Quality This report documents the results of an independent oversight review of selected aspects of...

  19. INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating Procedures INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating...

  20. INDEPENDENT TECHNICAL REVIEW OF THE C-400 INTERIM REMEDIAL PROJECT PHASE I RESULTS, PADUCAH, KENTUCKY

    SciTech Connect (OSTI)

    Looney, B.; Rossabi, J.; Stewart,L.; Richards, W.

    2010-10-29

    The groundwater and soil in the vicinity of the C-400 Building at the Paducah Gaseous Diffusion Plant (PGDP), is contaminated with substantial quantities of industrial solvents, primarily trichoroethene (TCE). This solvent 'source' is recognized as a significant challenge and an important remediation target in the overall environmental cleanup strategy for PGDP. Thus, the cleanup of the C-400 TCE Source is a principal focus for the Department of Energy (DOE) and its contractors, and for PGDP regulators and stakeholders. Using a formal investigation, feasibility study and decision process, Electrical Resistance Heating (ERH) was selected for the treatment of the soil and groundwater in the vicinity of C-400. ERH was selected as an interim action to remove 'a significant portion of the contaminant mass of TCE at the C-400 Cleaning Building area through treatment' with the longer term goal of reducing 'the period the TCE concentration in groundwater remains above its Maximum Contaminant Level (MCL).' ERH is a thermal treatment that enhances the removal of TCE and related solvents from soil and groundwater. The heterogeneous conditions at PGDP, particularly the high permeability regional gravel aquifer (RGA), are challenging to ERH. Thus, a phased approach is being followed to implement this relatively expensive and complex remediation technology. Conceptually, the phased approach encourages safety and efficiency by providing a 'lessons learned' process and allowing appropriate adjustments to be identified and implemented prior to follow-on phase(s) of treatment. More specifically, early deployment targeted portions of the challenging RGA treatment zone with relatively little contamination reducing the risk of adverse collateral impacts from underperformance in terms of heating and capture. Because of the importance and scope of the C-400 TCE source remediation activities, DOE chartered an Independent Technical Review (ITR) in 2007 to assess the C-400 ERH plans prior to deployment and a second ITR to evaluate Phase I performance in September 2010. In this report, these ITR efforts are referenced as the '2007 ITR' and the 'current ITR', respectively. The 2007 ITR document (Looney et al., 2007) provided a detailed technical evaluation that remains relevant and this report builds on that analysis. The primary objective of the current ITR is to provide an expedited assessment of the available Phase I data to assist the PGDP team as they develop the lessons learned from Phase I and prepare plans for Phase II.

  1. Vehicle Technologies Office Merit Review 2014: Central Texas Fuel Independence Project

    Broader source: Energy.gov [DOE]

    Presentation given by City of Austin at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about Central Texas Fuel...

  2. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    November 2013 | Department of Energy Portsmouth Gaseous Diffusion Plant - November 2013 Independent Oversight Review, Portsmouth Gaseous Diffusion Plant - November 2013 November 5, 2013 Review of Preparedness for Severe Natural Phenomena Events at the Portsmouth Gaseous Diffusion Plant This report documents the results of an independent oversight review of the preparedness of the DOE Portsmouth/Paducah Project Office, contractors at the DOE Portsmouth Gaseous Diffusion Plant, and selected

  3. External Independent Review (EIR) Standard Operating Procedure...

    Broader source: Energy.gov (indexed) [DOE]

    External Independent Review (EIR) Standard Operating Procedure (SOP) - September 2010 More Documents & Publications External Independent Review (EIR) Standard Operating Procedure...

  4. CONTAIN independent peer review

    SciTech Connect (OSTI)

    Boyack, B.E. [Los Alamos National Lab., NM (United States); Corradini, M.L. [Univ. of Wisconsin, Madison, WI (United States). Nuclear Engineering Dept.; Denning, R.S. [Battelle Memorial Inst., Columbus, OH (United States); Khatib-Rahbar, M. [Energy Research Inc., Rockville, MD (United States); Loyalka, S.K. [Univ. of Missouri, Columbia, MO (United States); Smith, P.N. [AEA Technology, Dorchester (United Kingdom). Winfrith Technology Center

    1995-01-01

    The CONTAIN code was developed by Sandia National Laboratories under the sponsorship of the US Nuclear Regulatory Commission (NRC) to provide integrated analyses of containment phenomena. It is used to predict nuclear reactor containment loads, radiological source terms, and associated physical phenomena for a range of accident conditions encompassing both design-basis and severe accidents. The code`s targeted applications include support for containment-related experimental programs, light water and advanced light water reactor plant analysis, and analytical support for resolution of specific technical issues such as direct containment heating. The NRC decided that a broad technical review of the code should be performed by technical experts to determine its overall technical adequacy. For this purpose, a six-member CONTAIN Peer Review Committee was organized and a peer review as conducted. While the review was in progress, the NRC issued a draft ``Revised Severe Accident Code Strategy`` that incorporated revised design objectives and targeted applications for the CONTAIN code. The committee continued its effort to develop findings relative to the original NRC statement of design objectives and targeted applications. However, the revised CONTAIN design objectives and targeted applications. However, the revised CONTAIN design objectives and targeted applications were considered by the Committee in assigning priorities to the Committee`s recommendations. The Committee determined some improvements are warranted and provided recommendations in five code-related areas: (1) documentation, (2) user guidance, (3) modeling capability, (4) code assessment, and (5) technical assessment.

  5. Independent Oversight Activity Report, Hanford Sludge Treatment Project -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 2013 | Department of Energy Sludge Treatment Project - September 2013 Independent Oversight Activity Report, Hanford Sludge Treatment Project - September 2013 November 2013 Hanford Sludge Treatment Project Engineered Container Retrieval and Transfer System Operational Awareness Review and Sludge Treatment Project Independent Project Review [HIAR-RL-2013-09-18] This Independent Oversight Activity Report documents an oversight activity conducted by the Office of Health, Safety and

  6. Independent Oversight Review, National Energy Technology Laboratory...

    Energy Savers [EERE]

    Independent Oversight Review, National Energy Technology Laboratory - May 2014 Independent Oversight Review, National Energy Technology Laboratory - May 2014 May 2014 Review of the...

  7. Independent Oversight Review, Waste Treatment and Immobilization Plant

    Office of Environmental Management (EM)

    Project - October 2010 | Department of Energy Project - October 2010 Independent Oversight Review, Waste Treatment and Immobilization Plant Project - October 2010 October 2010 Review of Nuclear Safety Culture at the Hanford Site Waste Treatment and Immobilization Plant Project The U.S. Department of Energy (DOE) Office of Health, Safety and Security (HSS) conducted an independent review of the nuclear safety culture at the Waste Treatment and Immobilization Plant (WTP) project at the Hanford

  8. Independent Activity Report, Hanford Sludge Treatment Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sludge Treatment Project - February 2012 Independent Activity Report, Hanford Sludge Treatment Project - February 2012 February 2012 Hanford Sludge Treatment Project Operational...

  9. Independent Oversight Assessment, Portsmouth/Paducah Project...

    Office of Environmental Management (EM)

    PortsmouthPaducah Project Office - May 2012 Independent Oversight Assessment, PortsmouthPaducah Project Office - May 2012 May 2012 Assessment of the PortsmouthPaducah Project...

  10. INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operating Procedures | Department of Energy INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating Procedures INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating Procedures PDF icon ICR_ICE SOP_Sep 2013_Final.pdf More Documents & Publications ICR-ICE Standard Operating Procedures (Update Sept 2013) Contractor SOW Template - ICR Contractor SOW Template - ICE

  11. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Environmental Management (EM)

    1 Independent Oversight Review, Los Alamos National Laboratory - December 2011 December 2011 Review of the Independent Integrated Safety ManagementIntegrated Work Management...

  12. Background Information for Independent Review Team. Lifecycle...

    Office of Scientific and Technical Information (OSTI)

    Information for Independent Review Team. Lifecycle Plan and FY14 Quarterly Reports Citation Details In-Document Search Title: Background Information for Independent Review Team. ...

  13. External Independent Review (EIR) Standard Operating Procedure (SOP)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    October 2008 | Department of Energy External Independent Review (EIR) Standard Operating Procedure (SOP) October 2008 External Independent Review (EIR) Standard Operating Procedure (SOP) October 2008 PDF icon External Independent Review (EIR) Standard Operating Procedure (SOP) October 2008 More Documents & Publications Contractor Statement of Work (SOW) Template (for EIR) Protocol_for_Environmental_Management_Cleanup_Projects_(clean).pdf External Independent Review (EIR) Standard

  14. Independent Oversight Review, National Nuclear Security Administration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Oversight Review, National Nuclear Security Administration Production Office - February 2014 February 2014 Review of the National Nuclear Security Administration ...

  15. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 2013 Independent Oversight Review, Portsmouth Gaseous Diffusion Plant - April 2013 April 2013 Review of the Integrated Safety Management System Phase I Verification Review at ...

  16. Independent Oversight Review, Pantex Plant - February 2012 |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plant - February 2012 Independent Oversight Review, Pantex Plant - February 2012 February 2012 Review of the Pantex Plant Implementation Verification Review Processes This report...

  17. Independent Activity Report, West Valley Demonstration Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    West Valley Demonstration Project - July 2012 Independent Activity Report, West Valley Demonstration Project - July 2012 July 2012 Operational Awareness Oversight of the West...

  18. Independent Oversight Activity Report, Idaho Cleanup Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Idaho Cleanup Project - November 2013 Independent Oversight Activity Report, Idaho Cleanup Project - November 2013 November 2013 Pre-restart Visit to the Integrated Waste Treatment...

  19. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant - April

    Office of Environmental Management (EM)

    2013 | Department of Energy April 2013 Independent Oversight Review, Portsmouth Gaseous Diffusion Plant - April 2013 April 2013 Review of the Integrated Safety Management System Phase I Verification Review at the Portsmouth Gaseous Diffusion Plant The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the U.S. Department of Energy (DOE) Portsmouth/Paducah Project Office (PPPO). The objective

  20. Independent Oversight Review, Los Alamos National Laboratory - September

    Office of Environmental Management (EM)

    2011 | Department of Energy September 2011 Independent Oversight Review, Los Alamos National Laboratory - September 2011 September 2011 Review of the Facility Centered Assessment of the Los Alamos National Laboratory Waste Disposition Project This report provides the results of an independent oversight review of the Facility Centered Assessment of the Waste Disposition Project at the Department of Energy's (DOE) Los Alamos National Laboratory. The review was conducted May 2-20, 2011, by the

  1. Independent Oversight Review, Y-12 National Security Complex - March 2014

    Office of Environmental Management (EM)

    | Department of Energy March 2014 Independent Oversight Review, Y-12 National Security Complex - March 2014 March 2014 Review of the Uranium Processing Facility Project Design Requirements and Configuration Management Program This report documents the results of an independent oversight review of the design control and configuration management program at the Uranium Processing Facility (UPF) project. The review was performed November 18-22, 2013 and December 16-20, 2013, by the Department

  2. Background Information for Independent Review Team. Lifecycle...

    Office of Scientific and Technical Information (OSTI)

    Background Information for Independent Review Team. Lifecycle Plan and FY14 Quarterly Reports Citation Details In-Document Search Title: Background Information for Independent...

  3. Independent Oversight Special Review, Bechtel Jacobs Company...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bechtel Jacobs Company, LLC - July 2011 Independent Oversight Special Review, Bechtel Jacobs Company, LLC - July 2011 July 2011 Special Review of the SuspectCounterfeit Items ...

  4. Independent Oversight Review, Nevada National Security Site,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site, December 2013 Independent Oversight Review, Nevada National Security Site, December 2013 December 2013 Targeted Review of the Safety Significant Blast Door and Special Door ...

  5. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January 2013 Independent Oversight Review, Waste Treatment and Immobilization Plant - January 2013 January 2013 Review of the Hanford Waste Treatment and Immobilization Plant ...

  6. Independent Oversight Review, Los Alamos National Laboratory...

    Energy Savers [EERE]

    September 2011 Independent Oversight Review, Los Alamos National Laboratory - September 2011 September 2011 Review of the Facility Centered Assessment of the Los Alamos National...

  7. Independent Oversight Review, Oak Ridge National Laboratory ...

    Energy Savers [EERE]

    National Laboratory - January 2013 Independent Oversight Review, Oak Ridge National Laboratory - January 2013 January 2013 Review of the Oak Ridge National Laboratory High Flux...

  8. Independent Oversight Review, Los Alamos National Laboratory...

    Energy Savers [EERE]

    April 2012 Independent Oversight Review, Los Alamos National Laboratory - April 2012 April 2012 Review of the Consequence Assessment Program at the Los Alamos National Laboratory...

  9. Independent Oversight Review, Los Alamos National Laboratory...

    Energy Savers [EERE]

    Los Alamos National Laboratory - January 2013 Independent Oversight Review, Los Alamos National Laboratory - January 2013 January 2013 Review of the Los Alamos National Laboratory...

  10. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    May 2013 Independent Oversight Review, Waste Treatment and Immobilization Plant - May 2013 May 2013 Review of the Hanford Site Waste Treatment and Immobilization Plant Construction...

  11. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    October 2012 Independent Oversight Review, Waste Treatment and Immobilization Plant - October 2012 October 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant...

  12. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 2012 Independent Oversight Review, Waste Treatment and Immobilization Plant - August 2012 August 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant...

  13. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Independent Oversight Review, Waste Treatment and Immobilization Plant - March 2013 March 2013 Review of the Hanford Site Waste Treatment and Immobilization Plant Construction...

  14. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January 2013 Independent Oversight Review, Portsmouth Gaseous Diffusion Plant - January 2013 January 2013 Review of the Portsmouth Gaseous Diffusion Plant Work Planning and Control...

  15. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plant - November 2013 Independent Oversight Review, Portsmouth Gaseous Diffusion Plant - November 2013 November 5, 2013 Review of Preparedness for Severe Natural Phenomena Events...

  16. Independent Oversight Review, Richland Operations Office - November...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Richland Operations Office - November 2012 Independent Oversight Review, Richland Operations Office - November 2012 November 2012 Review of the Richland Operations Office Oversight...

  17. Independent Oversight Review, Rocky Flats Environmental Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rocky Flats Environmental Technology Site - March 2000 Independent Oversight Review, Rocky Flats Environmental Technology Site - March 2000 March 2000 Review of the Rocky Flats...

  18. Radiography Facility - Building 239 Independent Validation Review

    SciTech Connect (OSTI)

    Altenbach, T J; Beaulieu, R A; Watson, J F; Wong, H J

    2010-02-02

    The purpose of this task was to perform an Independent Validation Review to evaluate the successful implementation and effectiveness of Safety Basis controls, including new and revised controls, to support the implementation of a new DSA/TSR for B239. This task addresses Milestone 2 of FY10 PEP 7.6.6. As the first IVR ever conducted on a LLNL nuclear facility, it was designated a pilot project. The review follows the outline developed for Milestone 1 of the PEP, which is based on the DOE Draft Guide for Performance of Independent Verification Review of Safety Basis Controls. A formal Safety Basis procedure will be developed later, based on the lessons learned with this pilot project. Note, this review is termed a ''Validation'' in order to be consistent with the PEP definition and address issues historically raised about verification mechanisms at LLNL. Validation is intended to confirm that implementing mechanisms realistically establish the ability of TSR LCO, administrative control or safety management program to accomplish its intended safety function and that the controls are being implemented. This effort should not, however, be confused with a compliance assessment against all relevant DOE requirements and national standards. Nor is it used as a vehicle to question the derivation of controls already approved by LSO unless a given TSR statement simply cannot be implemented as stated.

  19. Independent Activity Report, Hanford Sludge Treatment Project - February

    Office of Environmental Management (EM)

    2012 | Department of Energy Hanford Sludge Treatment Project - February 2012 Independent Activity Report, Hanford Sludge Treatment Project - February 2012 February 2012 Hanford Sludge Treatment Project Operational Awareness Review [HIAR-RL-2012-02-27] The U.S. Department of Energy's (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), performed operational awareness reviews of the Sludge Treatment Project (STP), Engineered Container Retrieval and

  20. Independent Oversight Review, Waste Treatment and Immobilization Plant -

    Office of Environmental Management (EM)

    March 2012 | Department of Energy March 2012 Independent Oversight Review, Waste Treatment and Immobilization Plant - March 2012 March 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant Project Construction Quality This report documents the results of an independent oversight review of Construction Quality at the Hanford Site Waste Treatment and Immobilization Plant (WTP). The review was performed November 14-17, 2011, by the U.S. Department of Energy's (DOE) Office of

  1. Independent Oversight Focused Program Review, Argonne National

    Office of Environmental Management (EM)

    Laboratory-West - May 2001 | Department of Energy Focused Program Review, Argonne National Laboratory-West - May 2001 Independent Oversight Focused Program Review, Argonne National Laboratory-West - May 2001 May 2001 Focused Program Review at Argonne National Laboratory-West This report provides the results of an independent focused review of the Emergency Management Program at the Department of Energy's Argonne National Laboratory-West site that was conducted by the Office of Independent

  2. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Immobilization Plant Project - October 2010 October 2010 Review of Nuclear Safety Culture at the Hanford Site Waste Treatment and Immobilization Plant Project The U.S....

  3. Independent Oversight Review, Bonneville Power Administration Safety

    Office of Environmental Management (EM)

    Management Program - March 2014 | Department of Energy Review, Bonneville Power Administration Safety Management Program - March 2014 Independent Oversight Review, Bonneville Power Administration Safety Management Program - March 2014 March 2014 Oversight Review of the Bonneville Power Administration Safety Management Program Bonneville Power Administration management requested that the U.S. Department of Energy Office of Enforcement and Oversight (Independent Oversight), within the Office

  4. Independent Oversight Review, Babcock & Wilcox Technical Services...

    Broader source: Energy.gov (indexed) [DOE]

    Long Lead Procurement Processed Used by Babcock & Wilcox Technical Services Y-12, LLC for the Uranium Processing Facility Project This report provides the results of an independent...

  5. External Independent Review (EIR) Scoping Meeting Agreement Form

    Broader source: Energy.gov [DOE]

    Under DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, the Office of Acquisition and Project Management (OAPM) must perform a Performance Baseline External Independent Review (EIR) prior to Critical Decision (CD) 2, and a Construction/Execution Readiness EIR for all Major System projects prior to CD-3.

  6. Independent Oversight Review, Richland Operations Office and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and work management and control processes in the areas of conduct of operations, quality assurance, and integrated safety management. Independent Oversight Review, Richland...

  7. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Health, Safety and Security (HSS), conducted an independent review of the Los Alamos National Laboratory (LANL) Weapons Engineering Tritium Facility (WETF) safety significant...

  8. Independent Oversight Review, Los Alamos National Laboratory...

    Broader source: Energy.gov (indexed) [DOE]

    Emergency Response Organization at the Los Alamos National Laboratory This report provides the results of an independent review of the Los Alamos National Laboratory emergency...

  9. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2013 November 2013 Review of the Los Alamos National Laboratory Radiological Controls Activity-Level Implementation This report documents the results of an independent oversight...

  10. Independent Oversight Review, Bonneville Power Administration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BPA recognizes that maintaining a safe work environment requires continuous evaluation and improvement. PDF icon Independent Oversight Review, Bonneville Power Administration ...

  11. External Independent Review (EIR) Standard Operating Procedure...

    Office of Environmental Management (EM)

    (EIR) Standard Operating Procedure (SOP) September 2010 External Independent Review (EIR) Standard Operating Procedure (SOP) Septemebr 2010 Contractor Statement of Work (SOW)...

  12. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    August 2011 Independent Oversight Review, Waste Treatment and Immobilization Plant - August 2011 August 2011 Hanford Waste Treatment and Immobilization Plant Construction Quality...

  13. Independent Oversight Targeted Review, Sandia National Laboratories -

    Office of Environmental Management (EM)

    April 2014 | Department of Energy Targeted Review, Sandia National Laboratories - April 2014 Independent Oversight Targeted Review, Sandia National Laboratories - April 2014 April 2014 Targeted Review of the Sandia National Laboratories Federal Assurance Capability The U.S. Department of Energy (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), conducted an independent review of the performance of the DOE Sandia Field Office safety oversight of

  14. Enterprise Assessments Review, West Valley Demonstration Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Security (HSS). This independent review of the emergency management program at the West Valley Demonstration Project (WVDP) was conducted prior to the creation of EA. HSS...

  15. Independent Peer Review Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Peer Review Program Independent Peer Review Program PDF icon 2014 PERT Charter.pdf More Documents & Publications Hydropower Vision Task Force Charter Policy Flash 2013-65 Procurement Evaluation & Re-Engineering Team (PERT) and Establishment of a 5-year Cycle with Corresponding Schedule Policy Flash 2013-65

  16. Independent Oversight Review, National Nuclear Security Administration

    Office of Environmental Management (EM)

    Production Office - February 2014 | Department of Energy Nuclear Security Administration Production Office - February 2014 Independent Oversight Review, National Nuclear Security Administration Production Office - February 2014 February 2014 Review of the National Nuclear Security Administration Production Office Readiness Review Program The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security, conducted

  17. Waste Treatment Plant External Independent Review, Office of River

    Energy Savers [EERE]

    Protection, Richland | Department of Energy Waste Treatment Plant External Independent Review, Office of River Protection, Richland Waste Treatment Plant External Independent Review, Office of River Protection, Richland March 28, 2016 8:00AM EDT to April 1, 2016 5:00PM EDT External Independent Review (EIR). On March 28 - April 1, the Office of Project Management Oversight and Assessments (PM) will lead the site visit for the first phase of the WTP Baseline Change Proposal (BCP)-02 EIR at the

  18. Independent Activity Report, Portsmouth/Paducah Project Office - April 2013

    Office of Environmental Management (EM)

    | Department of Energy Portsmouth/Paducah Project Office - April 2013 Independent Activity Report, Portsmouth/Paducah Project Office - April 2013 April 2003 Operational Awareness Oversight of the Portsmouth/Paducah Project Office (PPPO) Performance of the Contractor Assurance System Program [HIAR PORTS-2012-09-24] The Office of Health, Safety and Security (HSS) shadowed PPPO's review of specific elements of the Fluor-B&W Portsmouth (FBP) CAS program at the Portsmouth Gaseous Diffusion

  19. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant - January

    Office of Environmental Management (EM)

    2013 | Department of Energy January 2013 Independent Oversight Review, Portsmouth Gaseous Diffusion Plant - January 2013 January 2013 Review of the Portsmouth Gaseous Diffusion Plant Work Planning and Control Activities Prior to Work Execution The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted a shadowing oversight activity of the U.S. Department of Energy (DOE) Portsmouth/Paducah Project Office (PPPO) oversight

  20. Independent Oversight Targeted Review, Sandia National Laboratories...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    U.S. Department of Energy (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), conducted an independent review of the performance of...

  1. Independent Oversight Review, Waste Treatment and Immobilization Plant -

    Broader source: Energy.gov (indexed) [DOE]

    November 2011 | Department of Energy November 2011 Review of the Hanford Site Waste Treatment and Immobilization Plant Project Construction Quality This report documents the results of an independent oversight review of selected aspects of construction quality at the Department of Energy's (DOE) Hanford Site Waste Treatment and Immobilization Plant (WTP). The review was conducted September 12-15, 2011, by the DOE Office of Safety and Emergency Management Evaluations, which is within the DOE

  2. Independent technical review of the Pinellas Plant

    SciTech Connect (OSTI)

    Not Available

    1994-07-01

    This report documents an Independent Technical Review (ITR) of facilities, organizations, plans, activities and various other elements required to successfully transition the Pinellas Plant from Defense Program (DP) funded operation to either community developed reuse or safe deactivation leading to decontamination and decommissioning (D&D). The review was conducted at the request of the Department of Energy (DOE) Deputy Assistant Secretary for Facility Transition and Management (EM-60) and is a consensus of the nine member ITR Team.

  3. EXTERNAL INDEPENDENT REVIEW (EIR) STANDARD OPERATING PROCEDURES (SOP)

    Office of Environmental Management (EM)

    EXTERNAL INDEPENDENT REVIEW (EIR) STANDARD OPERATING PROCEDURES (SOP) Revision 2 U.S. DEPARTMENT OF ENERGY (DOE) OFFICE OF PROJECT MANAGEMENT OVERSIGHT AND ASSESSMENTS (PMOA) October 2015 2 TABLE OF CONTENTS 1.0 PURPOSE AND AUTHORITY .................................................................................3 2.0 EIR BUDGETING .....................................................................................................4 3.0 EIR TEAM COMPOSITION

  4. External Independent Review (EIR) Standard Operating Procedure (SOP) October 2015

    Broader source: Energy.gov [DOE]

    The Office of Project Management Oversight and Assessments (PMOA) performs External Independent Reviews (EIRs) to provide Project Management Executives (PMEs), senior leaders within the Department of Energy (DOE), and Congress with an unbiased assessment of whether a capital asset project can be executed within proposed scope, schedule and cost commitments, while also meeting its key performance parameters and ultimately fulfilling its associated mission need. The objectives of this EIR Standard Operating Procedures (SOP) document are to clarify EIR expectations and to facilitate EIR planning and execution by PMOA, its support contractors, DOE Program offices and project teams.

  5. Independent technical review of the Mound Plant

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    This report documents an Independent Technical Review (ITR) of the facilities, organizations, plans, and activities required to transition particular elements of the Mound Plant from Defense Program (DP) funded operation as appropriate either to community developed reuse or safe deactivation leading to decontamination and decommissioning (D&D). The review was conducted at the request of the Dr. Willis Bixby, Deputy Assistant Secretary, U.S. Department of Energy EM-60, Office of Facility Transition and Management and is a consensus of the nine member ITR Team. Information for the review was drawn from documents provided to the ITR Team by the Miamisburg Area Office (MB) of the DOE, EG&G, the City of Miamisburg, and others; and from presentations, discussions, interviews, and facility inspections at the Mound Plant during the weeks of March 14 and March 28, 1994. During the week of April 25, 1994, the ITR Team met at Los Alamos, New Mexico to develop consensus recommendations. A presentation of the core recommendations was made at the Mound Plant on May 5, 1994. This is an independent assessment of information available to, and used by, the Mound Plant personnel. Repetition of the information is not meant to imply discovery by the ITR Team. Team members, however, acting as independent reviewers, frequently assess the information from a perspective that differs significantly from that of the Mound Plant personnel. The report is based on information obtained and conditions observed during the March 1994 review interval. The ITR process and normal site work often initiate rapid, beneficial changes in understanding and organization immediately following the review. These changes frequently alter conditions observed during the review, but the report does not address changes subsequent to the review interval.

  6. Pantex Falling Man - Independent Review Panel Report.

    SciTech Connect (OSTI)

    Bertolini, Louis; Brannon, Nathan; Olson, Jared; Price, Bernard; Wardle, Robert; Steinzig, Mike; Winfield, Michael

    2014-11-01

    Consolidated Nuclear Security (CNS) Pantex took the initiative to organize a Review Panel of subject matter experts to independently assess the adequacy of the Pantex Tripping Man Analysis methodology. The purpose of this report is to capture the details of the assessment including the scope, approach, results, and detailed Appendices. Along with the assessment of the analysis methodology, the panel evaluated the adequacy with which the methodology was applied as well as congruence with Department of Energy (DOE) standards 3009 and 3016. The approach included the review of relevant documentation, interactive discussion with Pantex staff, and the iterative process of evaluating critical lines of inquiry.

  7. Independent Oversight Follow-up Review, Savannah River National...

    Energy Savers [EERE]

    Follow-up Review of Implementation Verification Reviews at the Savannah River National Laboratory Savannah River Site This report provides the results of an independent review...

  8. Independent Oversight Review of the Lawrence Livermore National...

    Energy Savers [EERE]

    Review of the Lawrence Livermore National Laboratory - March 2001 Independent Oversight Review of the Lawrence Livermore National Laboratory - March 2001 March 2001 Review of the...

  9. Hydrogen Production Cost Estimate Using Biomass Gasification: Independent Review

    SciTech Connect (OSTI)

    none,

    2011-10-01

    This independent review is the conclusion arrived at from data collection, document reviews, interviews and deliberation from December 2010 through April 2011 and the technical potential of Hydrogen Production Cost Estimate Using Biomass Gasification. The Panel reviewed the current H2A case (Version 2.12, Case 01D) for hydrogen production via biomass gasification and identified four principal components of hydrogen levelized cost: CapEx; feedstock costs; project financing structure; efficiency/hydrogen yield. The panel reexamined the assumptions around these components and arrived at new estimates and approaches that better reflect the current technology and business environments.

  10. Independent Activity Report, Portsmouth/Paducah Project Office...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PortsmouthPaducah Project Office - April 2013 Independent Activity Report, PortsmouthPaducah Project Office - April 2013 April 2003 Operational Awareness Oversight of the...

  11. Independent Oversight Assessment, Idaho Cleanup Project Sodium...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste Treatment Project - November 2012 November 2012 Assessment of Nuclear Safety Culture at the Idaho Cleanup Project Sodium Bearing Waste Treatment Project This report...

  12. Independent Oversight Assessment, Idaho Cleanup Project Sodium Bearing

    Office of Environmental Management (EM)

    Waste Treatment Project - November 2012 | Department of Energy Idaho Cleanup Project Sodium Bearing Waste Treatment Project - November 2012 Independent Oversight Assessment, Idaho Cleanup Project Sodium Bearing Waste Treatment Project - November 2012 November 2012 Assessment of Nuclear Safety Culture at the Idaho Cleanup Project Sodium Bearing Waste Treatment Project This report provides the results of an independent assessment of nuclear safety culture at the Sodium Bearing Waste Treatment

  13. Independent Oversight Special Review, Department of Energy sites...

    Office of Environmental Management (EM)

    of Energy sites - February 2008 February 2008 Independent Oversight Special Review of Workplace Exposure Monitoring This report provides the results of a Special Review of...

  14. Independent Oversight Review of DOE Headquarters Emergency Response...

    Energy Savers [EERE]

    Review of DOE Headquarters Emergency Response Plans and Performance, March 2003 Independent Oversight Review of DOE Headquarters Emergency Response Plans and Performance, March...

  15. Independent Oversight Review, Hanford Site Waste Treatment and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste Treatment and Immobilization Plant - June 2014 Independent Oversight Review, Hanford Site Waste Treatment and Immobilization Plant - June 2014 June 2014 Review of the Hanford ...

  16. Independent Oversight Review, Hanford Site Tank Farms 222-S Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Tank Farms 222-S Laboratory - January 2014 Independent Oversight Review, Hanford Site Tank Farms 222-S Laboratory - January 2014 January 2014 Review of the Hanford Tank Farms ...

  17. Independent Oversight Review, Hanford Tank Farms - December 2012...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - December 2012 December 2012 Review of the Hanford Tank Farms Radiological Controls Activity-Level Implementation This report documents an independent review by the Office of...

  18. Independent Oversight Review, Savannah River Site Salt Waste...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 2013 Independent Oversight Review, Savannah River Site Salt Waste Processing Facility - August 2013 August 2013 Review of the Savannah River Site Salt Waste Processing...

  19. Independent Oversight Review, Oak Ridge Transuranic Waste Processing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Center, September 2013 Independent Oversight Review, Oak Ridge Transuranic Waste Processing Center, September 2013 September 2013 Review of Management of Safety Systems at the Oak...

  20. Independent Oversight Review, Waste Isolation Pilot Plant - November...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    November 2012 Independent Oversight Review, Waste Isolation Pilot Plant - November 2012 November 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Waste...

  1. Independent Oversight Review, Waste Isolation Pilot Plant - April...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 2013 Independent Oversight Review, Waste Isolation Pilot Plant - April 2013 April 2013 Review of the Waste Isolation Pilot Plant Work Planning and Control Activities The...

  2. Independent Oversight Targeted Review, Y-12 National Security...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Y-12 National Security Complex - February 2012 Independent Oversight Targeted Review, Y-12 National Security Complex - February 2012 February 2012 Targeted Review of Site...

  3. Independent Oversight Review of the NNSA Production Office Readiness...

    Energy Savers [EERE]

    Independent Oversight Review of the NNSA Production Office Readiness Review Program February 2014 Office of Safety and Emergency Management Evaluations Office of Enforcement and...

  4. Independent Oversight Review, Hanford Waste Treatment and Immobilizati...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 2014 Independent Oversight Review, Hanford Waste Treatment and Immobilization Plant - March 2014 March 2014 Review of the Hanford Site Waste Treatment and Immobilization...

  5. Independent Oversight Review, Hanford Waste Treatment and Immobilizati...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    December 2013 Independent Oversight Review, Hanford Waste Treatment and Immobilization Plant - December 2013 December 2013 Review of the Hanford Site Waste Treatment and...

  6. Independent Oversight Review, Hanford Site CH2M Hill Plateau...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CH2M Hill Plateau Remediation Company - November 2012 Independent Oversight Review, Hanford Site CH2M Hill Plateau Remediation Company - November 2012 November 2012 Review of the...

  7. Enterprise Assessments Review, West Valley Demonstration Project -

    Office of Environmental Management (EM)

    December 2014 | Department of Energy Emergency Management Program Technical Basis and Emergency Preparedness The U.S. Department of Energy (DOE) independent Office of Enterprise Assessments (EA) was established in May 2014 and assumed responsibility for managing the Department's independent oversight program from the Department's former Office of Health, Safety and Security (HSS). This independent review of the emergency management program at the West Valley Demonstration Project (WVDP) was

  8. External Independent Review (EIR) Standard Operating Procedure (SOP)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 2010 | Department of Energy September 2010 External Independent Review (EIR) Standard Operating Procedure (SOP) September 2010 PDF icon EXTERNAL INDEPENDENT REVIEW (EIR) STANDARD OPERATING PROCEDURE (SOP) September 2010 More Documents & Publications External Independent Review (EIR) Standard Operating Procedure (SOP) Septemebr

  9. External Independent Review (EIR) Standard Operating Procedure (SOP)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Septemebr 2010 | Department of Energy Septemebr 2010 External Independent Review (EIR) Standard Operating Procedure (SOP) Septemebr 2010 PDF icon External Independent Review (EIR) Standard Operating Procedure (SOP) - September 2010 More Documents & Publications External Independent Review (EIR) Standard Operating Procedure (SOP) September

  10. BETO Project Management Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Management Review June 25, 2015 Jonathan Male Director, Bioenergy Technologies Office (BETO) 2 | Bioenergy Technologies Office I. BETO Portfolio II. Coordination of Technology Areas III. Synergies IV. Project Impacts V. Technology Pathways VI. Budget Priorities VII. Other Technologies & Market Trends VIII. New Initiatives Outline 3 | Bioenergy Technologies Office BETO Portfolio * Integration of lessons learned for IBRs - BETO's IBR Investment Report has been finalized and will be

  11. Independent Oversight Review, DOE Headquarters Facilities - March 2002 |

    Energy Savers [EERE]

    Department of Energy DOE Headquarters Facilities - March 2002 Independent Oversight Review, DOE Headquarters Facilities - March 2002 March 2002 Review of the Headquarters Facilities Emergency Response Plans This report provides the results of an independent review of the emergency response plans for the Department of Energy's Headquarters facilities. The review was performed in February 2002 by the DOE Office of Independent Oversight and Performance Assurance. The purpose of the review was

  12. Independent Oversight Assessment, Salt Waste Processing Facility Project -

    Office of Environmental Management (EM)

    January 2013 | Department of Energy Salt Waste Processing Facility Project - January 2013 Independent Oversight Assessment, Salt Waste Processing Facility Project - January 2013 January 2013 Assessment of Nuclear Safety Culture at the Salt Waste Processing Facility Project The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent assessment of nuclear safety culture at the

  13. Independent Oversight Review, Savannah River Site Tritium Facilities - June

    Office of Environmental Management (EM)

    2012 | Department of Energy June 2012 Independent Oversight Review, Savannah River Site Tritium Facilities - June 2012 June 2012 Review of the Savannah River Site Tritium Facilities Implementation Verification Review Processes This report documents the results of an independent review of the implementation verification review (IVR) processes at the Department of Energy's (DOE) Savannah River Site Tritium Facilities. The review was conducted April 16-19, 2012, by the DOE Office of Safety and

  14. Independent Oversight Review, Y-12 National Security Complex - June 2012 |

    Office of Environmental Management (EM)

    Department of Energy June 2012 Independent Oversight Review, Y-12 National Security Complex - June 2012 June 2012 Review of the Y-12 Implementation Verification Review Processes This report documents the results of an independent review of the implementation verification review (IVR) processes at the Department of Energy's (DOE) Y-12 National Security Complex. The review was conducted March 12-30, 2012, by the DOE Office of Safety and Emergency Management Evaluations, which is within the

  15. Independent Oversight Review, Savannah River Operations Office - July 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Independent Oversight Review, Savannah River Operations Office - July 2013 Independent Oversight Review, Savannah River Operations Office - July 2013 July 2013 Review of the Employee Concerns Program at the Savannah River Operations Office The purpose of this Independent Oversight targeted review was to evaluate DOE-SR processes and their implementation for addressing safety concerns reported by DOE, contractor, and subcontractor employees at the Savannah River Site

  16. Enterprise Assessments Review, West Valley Demonstration Project -

    Office of Environmental Management (EM)

    December 2014 | Department of Energy Radiological Controls Activity-Level Implementation The Office of Nuclear Safety and Environmental Assessments, within the U.S. Department of Energy's Office of Enterprise Assessments, conducted an independent oversight review of activity-level implementation of the radiation protection program at the West Valley Demonstration Project. The onsite review was conducted during May 19-22 and June 9-13, 2014. PDF icon Enterprise Assessments Review, West Valley

  17. Independent Oversight Assessment, Portsmouth/Paducah Project Office - May

    Energy Savers [EERE]

    2012 | Department of Energy Portsmouth/Paducah Project Office - May 2012 Independent Oversight Assessment, Portsmouth/Paducah Project Office - May 2012 May 2012 Assessment of the Portsmouth/Paducah Project Office Conduct of Operations Oversight of the Depleted Uranium Hexafluoride Conversion Plants This report provides the results of an independent assessment of the Department of Energy's (DOE) Portsmouth/Paducah Project Office oversight of conduct of operations at DOE's depleted uranium

  18. Independent Oversight Targeted Review, Sandia National Laboratories...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review, Sandia National Laboratories - November 2013 December 2013 Targeted Review of Activity-Level Implementation of Radiological Controls at Sandia National Laboratories This...

  19. Independent Oversight Review, Savannah River Site - September 2011 |

    Energy Savers [EERE]

    Department of Energy - September 2011 Independent Oversight Review, Savannah River Site - September 2011 September 2011 Review of the Implementation Verification Review Processes at the Savannah River Site Environmental Management Nuclear Facilities This report provides the results of an independent oversight review of the of the Implementation Verification Review (IVR) processes for the Environmental Management nuclear facilities at the Department of Energy's (DOE) Savannah River Site. The

  20. Independent Oversight Review of the Lawrence Livermore National Laboratory

    Office of Environmental Management (EM)

    - March 2001 | Department of Energy Review of the Lawrence Livermore National Laboratory - March 2001 Independent Oversight Review of the Lawrence Livermore National Laboratory - March 2001 March 2001 Review of the Lawrence Livermore National Laboratory Health Services Department This report provides the results of an independent oversight review of the Health Services Division at the Department of Energy's (DOE) Lawrence Livermore National Laboratory. The review was performed March 19-21,

  1. Independent Oversight Review, Hanford Site - July 2012 | Department of

    Office of Environmental Management (EM)

    Energy - July 2012 Independent Oversight Review, Hanford Site - July 2012 July 2012 Review of the Hanford Site Employee Concerns Programs TThis report provides the results of an independent oversight review of the Hanford Site Employee Concerns Programs. The review was performed April 30-May 4, 2012, by the U.S. Department of Energy's (DOE) Office of Safety and Emergency Management Evaluations, which is within the DOE Office of Health, Safety and Security. The overall purpose of this review

  2. Independent Oversight Review, Los Alamos National Laboratory - July 2012 |

    Office of Environmental Management (EM)

    Department of Energy July 2012 Independent Oversight Review, Los Alamos National Laboratory - July 2012 July 2012 Review of the Los Alamos National Laboratory Implementation Verification Review at Technical Area-55 his report documents the results of an independent review of the implementation verification review (IVR) process at the Los Alamos National Laboratory plutonium facility at Technical Area-55 that was conducted by the Department of Energy's (DOE) Office of Health, Safety and

  3. Independent Oversight Review, Los Alamos National Laboratory - July 2014 |

    Energy Savers [EERE]

    Department of Energy July 2014 Independent Oversight Review, Los Alamos National Laboratory - July 2014 July 2014 Review of the Los Alamos National Laboratory Transuranic Waste Facility Safety Basis and Design Development The U.S. Department of Energy's (DOE) Office of Environment, Safety and Health Assessments, within the DOE Office of Independent Enterprise Assessments (formerly the Office of Health, Safety and Security), conducted an independent oversight review of the preliminary safety

  4. Independent Oversight Review, Savannah River Site Salt Waste Processing

    Energy Savers [EERE]

    Facility - April 2014 | Department of Energy Salt Waste Processing Facility - April 2014 Independent Oversight Review, Savannah River Site Salt Waste Processing Facility - April 2014 April 2014 Review of the Savannah River Site Salt Waste Processing Facility Construction Quality and Fire Protection Systems The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security, conducted an independent review of the

  5. Independent Oversight Review of DOE Headquarters Emergency Response Plans

    Office of Environmental Management (EM)

    and Performance, March 2003 | Department of Energy Review of DOE Headquarters Emergency Response Plans and Performance, March 2003 Independent Oversight Review of DOE Headquarters Emergency Response Plans and Performance, March 2003 March 26, 2003 The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted a review of emergency response plans and performance at DOE Headquarters (HQ) in February 2003. This report provides the results of an independent

  6. Independent Oversight Review, Hanford Site Tank Farms 222-S Laboratory -

    Office of Environmental Management (EM)

    January 2014 | Department of Energy Tank Farms 222-S Laboratory - January 2014 Independent Oversight Review, Hanford Site Tank Farms 222-S Laboratory - January 2014 January 2014 Review of the Hanford Tank Farms Safety Management Program Implementation Electrical Safety in the 222-S Laboratory The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the

  7. Independent Oversight Review, Hanford Tank Farms - April 2013 | Department

    Office of Environmental Management (EM)

    of Energy Tank Farms - April 2013 Independent Oversight Review, Hanford Tank Farms - April 2013 April 2013 Review of Management of Safety Systems at the Hanford Tank Farms The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the management of safety class or safety significant structures, systems and components (hereinafter referred to as safety systems) at

  8. Independent Oversight Review, Lawrence Livermore National Laboratory - July

    Office of Environmental Management (EM)

    2013 | Department of Energy Lawrence Livermore National Laboratory - July 2013 Independent Oversight Review, Lawrence Livermore National Laboratory - July 2013 July 2013 Review of Preparedness for Severe Natural Phenomena Events at the Lawrence Livermore National Laboratory The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the National Nuclear Security Administration (NNSA) Livermore

  9. Independent Oversight Review, Nevada National Security - May 2013 |

    Office of Environmental Management (EM)

    Department of Energy - May 2013 Independent Oversight Review, Nevada National Security - May 2013 May 2013 Review of the Nevada National Security Site Criticality Safety Program Corrective Action Plan Closure The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security, conducted an independent review of the National Nuclear Security Administration (NNSA) Nevada Field Office (NFO) and National Security

  10. Independent Oversight Review, Paducah Site - April 2013 | Department of

    Office of Environmental Management (EM)

    Energy Paducah Site - April 2013 Independent Oversight Review, Paducah Site - April 2013 April 2013 Review of Preparedness for Severe Natural Phenomena Events at the Paducah Site The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the U.S. Department of Energy (DOE) Paducah site's preparedness for severe natural phenomena events (NPEs). The HSS Office of Safety and Emergency Management

  11. Independent Oversight Review, Savannah River Site - January 2013 |

    Office of Environmental Management (EM)

    Department of Energy - January 2013 Independent Oversight Review, Savannah River Site - January 2013 January 2013 Review of the Savannah River Site, Waste Solidification Building, Construction Quality of Mechanical Systems Installation and Selected Aspects of Fire Protection System Design The Office of Enforcement and Oversight (Independent Oversight), within the U.S. Department of Energy (DOE) Office of Health, Safety and Security (HSS), conducted an independent review of construction

  12. Independent Oversight Review, Savannah River Site Tritium Facilities -

    Office of Environmental Management (EM)

    December 2012 | Department of Energy December 2012 Independent Oversight Review, Savannah River Site Tritium Facilities - December 2012 December 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Savannah River Site Tritium Facilities The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of preparedness for severe natural phenomena events (NPEs) at the National Nuclear

  13. Independent Oversight Review, Waste Treatment and Immobilization Plant -

    Office of Environmental Management (EM)

    January 2013 | Department of Energy January 2013 Independent Oversight Review, Waste Treatment and Immobilization Plant - January 2013 January 2013 Review of the Hanford Waste Treatment and Immobilization Plant Black-Cell and Hard-To-Reach Pipe Spools Procurement Process and the Office of River Protection Audit of That Process The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted a concurrent independent review with

  14. Independent Oversight Review, Waste Treatment and Immobilization Plant -

    Office of Environmental Management (EM)

    May 2013 | Department of Energy May 2013 Independent Oversight Review, Waste Treatment and Immobilization Plant - May 2013 May 2013 Review of the Hanford Site Waste Treatment and Immobilization Plant Construction Quality The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight) within the Office of Health, Safety and Security (HSS) conducted an independent review of selected aspects of construction quality at the Hanford Site Waste Treatment and

  15. Independent Oversight Review, Savannah River Site- August 2011

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of Commercial Grade Dedication Plans for the Safety Instrumented System at the Savannah River Site Waste Solidification Building Project

  16. Independent Oversight Review, Savannah River Site- July 2011

    Broader source: Energy.gov [DOE]

    Review of Electrical System Configuration Management and Design Change Control at the Savannah River Site, Waste Solidification Building Project

  17. Independent Oversight Review, Hanford K Basin and Cold Vacuum...

    Broader source: Energy.gov (indexed) [DOE]

    Hanford K Basin and Cold Vacuum Drying Facility Found Fuel Multi-Canister Overpack Operations This report provides the results of an independent oversight review of operations...

  18. Distributed Hydrogen Production from Natural Gas: Independent Review

    SciTech Connect (OSTI)

    Fletcher, J.; Callaghan, V.

    2006-10-01

    Independent review report on the available information concerning the technologies needed for forecourts producing 150 kg/day of hydrogen from natural gas.

  19. Independent Oversight Review of the Technical Area 55 Safety...

    Office of Environmental Management (EM)

    the FSS is not credited for a Performance Category-3 (PC-3) evaluation basis earthquake, but is credited for PC-2 events. The Independent Oversight team reviewed...

  20. Independent Oversight Review, Savannah River Field Office Tritium...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2013 Review of Savannah River Field Office Tritium Facilities Radiological Controls Activity-Level Implementation This report documents the results of an independent oversight...

  1. Independent Oversight Review, Los Alamos National Laboratory- December 2011

    Broader source: Energy.gov [DOE]

    Review of the Independent Integrated Safety Management/Integrated Work Management Assessment of Research and Development and Programmatic Work at the Los Alamos National Laboratory

  2. Distributed Hydrogen Production from Natural Gas: Independent Review Panel Report

    Broader source: Energy.gov [DOE]

    Independent review report on the available information concerning the technologies needed for forecourts producing 150 kg/day of hydrogen from natural gas.

  3. Independent Oversight Review, Savannah River Site Tritium Facilities...

    Broader source: Energy.gov (indexed) [DOE]

    Facilities - June 2012 More Documents & Publications Technical Qualification Program Self-Assessment Report - Savannah River Site Office - 2011 Independent Oversight Review,...

  4. Independent Oversight Review, Hanford Site K-West Annex Facility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    K-West Annex Facility - April 2014 Independent Oversight Review, Hanford Site K-West Annex Facility - April 2014 April 2014 Review of the Hanford Site K-West Annex Facility ...

  5. Independent Oversight Follow-up Review, Hanford Site - June 2011...

    Broader source: Energy.gov (indexed) [DOE]

    Follow-up Review of the Hanford Site Chronic Beryllium Disease Prevention Program This report provides the results of a follow-up independent oversight review of the Hanford Site...

  6. Independent Oversight Review, Idaho Site, March 2013 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site, March 2013 Independent Oversight Review, Idaho Site, March 2013 March 2013 Review of the Facility Representative Program at the Idaho Site The U.S. Department of Energy (DOE)...

  7. Independent Oversight Review, Los Alamos Site Office - March...

    Office of Environmental Management (EM)

    2012 March 2012 Review of the Los Alamos Site Office Safety System Oversight Program Self-Assessment This report provides the results of an independent oversight review of the...

  8. Independent Oversight Review, Hanford Site - September 2013 | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy - September 2013 Independent Oversight Review, Hanford Site - September 2013 September 2013 Review of Preparedness for Severe Natural Phenomena Events at the Hanford Site This report documents the results of an independent oversight review of the preparedness of the DOE Richland Operations Office (DOE/RL) and the various Hanford Site contractors to deal with severe natural phenomena events (NPE). The review was conducted April - May 2013 by the U.S. Department of Energy's (DOE)

  9. Independent Oversight Review, Los Alamos National Laboratory - April 2012 |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy Review, Los Alamos National Laboratory - April 2012 Independent Oversight Review, Los Alamos National Laboratory - April 2012 April 2012 Review of the Emergency Response Organization at the Los Alamos National Laboratory This report provides the results of an independent review of the Los Alamos National Laboratory emergency response organization program that was conducted February 7-9, 2012, by the Office of Safety and Emergency Management Evaluations within the

  10. Independent Oversight Review, Livermore Site Office - October 2011 |

    Energy Savers [EERE]

    Department of Energy Livermore Site Office - October 2011 Independent Oversight Review, Livermore Site Office - October 2011 October 2011 Review of Integrated Safety Management System Effectiveness at the Livermore Site Office This report provides the results of an independent oversight review of the effectiveness of the integrated safety management system at the Department of Energy's (DOE) Livermore Site Office. The review was conducted July 11-21, 2011, by the Office of Safety and

  11. Independent Oversight Follow-up Review, Savannah River National Laboratory

    Office of Environmental Management (EM)

    - January 2012 | Department of Energy Savannah River National Laboratory - January 2012 Independent Oversight Follow-up Review, Savannah River National Laboratory - January 2012 January 2012 Follow-up Review of Implementation Verification Reviews at the Savannah River National Laboratory Savannah River Site This report provides the results of an independent review of the identification and implementation of safety basis hazard controls associated with "flashing spray release"

  12. Independent Oversight Review, Hanford Site Waste Treatment and

    Office of Environmental Management (EM)

    Immobilization Plant - June 2014 | Department of Energy Waste Treatment and Immobilization Plant - June 2014 Independent Oversight Review, Hanford Site Waste Treatment and Immobilization Plant - June 2014 June 2014 Review of the Hanford Site Waste Treatment and Immobilization Plant Construction Quality This report documents the results of an independent oversight review of selected aspects of construction quality at the Hanford Site Waste Treatment and Immobilization Plant. The review, which

  13. Independent Oversight Review, Idaho National Laboratory - July 2012 |

    Office of Environmental Management (EM)

    Department of Energy National Laboratory - July 2012 Independent Oversight Review, Idaho National Laboratory - July 2012 July 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Idaho National Laboratory This report documents the results of an independent review of the Department of Energy (DOE) Idaho National Laboratory's preparedness for severe natural phenomena events. The review was performed in April and May 2012 by the DOE Office of Safety and Emergency

  14. Independent Oversight Review, Idaho Site - November 2012 | Department of

    Office of Environmental Management (EM)

    Energy Site - November 2012 Independent Oversight Review, Idaho Site - November 2012 November 2012 Review of Radiation Protection Program Implementation at the Idaho Site This report documents an independent review of radiation protection program implementation at the Idaho Site that was conducted by the U.S. Department of Energy's (DOE) Office of Safety and Emergency Management Evaluations, which is within the DOE Office of Health, Safety and Security (HSS). The review was performed

  15. Independent Oversight Review, Los Alamos National Laboratory - March 2012 |

    Office of Environmental Management (EM)

    Department of Energy March 2012 Independent Oversight Review, Los Alamos National Laboratory - March 2012 March 2012 Review of the Los Alamos National Laboratory Nuclear Facility Configuration Management Program This report documents the results of an independent review of the Los Alamos National Laboratory's nuclear facility configuration management program. The review was conducted August 8-18, 2011, by the U.S. Department of Energy's Office of Safety and Emergency Management Evaluations,

  16. Independent Oversight Review, Nevada National Security Site, December 2013

    Office of Environmental Management (EM)

    | Department of Energy Site, December 2013 Independent Oversight Review, Nevada National Security Site, December 2013 December 2013 Targeted Review of the Safety Significant Blast Door and Special Door Interlock Systems and Review of Federal Assurance Capability at the Nevada National Security Site This report documents the results of an independent oversight review of safety significant Blast Door Interlock and Special Door Interlock systems at the Nevada National Security Site (NNSS)

  17. Independent Oversight Review, Pantex Plant, December 2013 | Department of

    Office of Environmental Management (EM)

    Energy Pantex Plant, December 2013 Independent Oversight Review, Pantex Plant, December 2013 December 2013 Targeted Review of the Safety Significant Blast Door and Personnel Door Interlock Systems and Review of Federal Assurance Capability at the Pantex Plant This report documents the results of an independent oversight review of safety significant Blast Door Interlock and personnel Door Interlock Systems at the Pantex Plant. The Pantex Plant is operated by Babcock & Wilcox Technical

  18. Independent Oversight Review, Savannah River Operations Office - July 2013

    Office of Environmental Management (EM)

    | Department of Energy Operations Office - July 2013 Independent Oversight Review, Savannah River Operations Office - July 2013 July 2013 Review of the Employee Concerns Program at the Savannah River Operations Office The purpose of this Independent Oversight targeted review was to evaluate DOE-SR processes and their implementation for addressing safety concerns reported by DOE, contractor, and subcontractor employees at the Savannah River Site (SRS). This targeted review was performed at

  19. Independent Oversight Review, Waste Treatment and Immobilization Plant -

    Office of Environmental Management (EM)

    August 2012 | Department of Energy August 2012 Independent Oversight Review, Waste Treatment and Immobilization Plant - August 2012 August 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant Construction Quality This report documents the results of an independent oversight review of Construction Quality at the Hanford Site Waste Treatment and Immobilization Plant (WTP). The review was performed February 6-10, 2012, and April 30 - May 4, 2012, by the U.S. Department of

  20. Independent Oversight Review, Waste Treatment and Immobilization Plant -

    Office of Environmental Management (EM)

    October 2012 | Department of Energy October 2012 Independent Oversight Review, Waste Treatment and Immobilization Plant - October 2012 October 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant Construction Quality This report documents the results of an independent review of selected aspects of construction quality at the Department of Energy's (DOE) Hanford Site Waste Treatment and Immobilization Plant. The review was conducted August 6-10, 2012, by the DOE Office of

  1. Independent Oversight Special Review, Department of Energy sites - February

    Office of Environmental Management (EM)

    2008 | Department of Energy Department of Energy sites - February 2008 Independent Oversight Special Review, Department of Energy sites - February 2008 February 2008 Independent Oversight Special Review of Workplace Exposure Monitoring This report provides the results of a Special Review of Construction Safety and Health Programs at Department of Energy (DOE) sites. This special review is based on data collected from late 2005 to early 2008 during scheduled inspections performed by the DOE

  2. External Independent Review (EIR) Standard Operating Procedure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The purpose is to provide the Acquisition Executive and senior leadership within the Department of Energy, as well as Congress confidence, with minimal bias, that the project can ...

  3. Independent Peer Review Program | Department of Energy

    Energy Savers [EERE]

    Peer Review Program PDF icon 2014 PERT Charter.pdf More Documents & Publications Hydropower Vision Task Force Charter Policy Flash 2013-65 Procurement Evaluation &...

  4. Independent Oversight Review, Lawrence Livermore National Laboratory...

    Energy Savers [EERE]

    Management Evaluations performed this review to evaluate the processes for identifying emergency response capabilities and maintaining them in a state of readiness in case of a...

  5. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    December 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant Low Activity Waste Melter Process System Hazards Analysis Activity The Office of Enforcement and...

  6. Independent Oversight Review, Lawrence Livermore National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lawrence Livermore National Laboratory - September 2013 September 2013 Review of the Fire Protection Program at Lawrence Livermore National Laboratory This report documents the...

  7. Independent Oversight Review, Pacific Northwest National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pacific Northwest National Laboratory - September 2013 September 2013 Review of the Fire Protection Program at Pacific Northwest National Laboratory and the Fire Suppression...

  8. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Laboratory - December 2013 December 2013 Review of the Technical Area 55 Safety Class Fire Suppression System at Los Alamos National Laboratory This report documents the results...

  9. Independent Oversight Review, Argonne National Laboratory - November...

    Broader source: Energy.gov (indexed) [DOE]

    Office of Health, Safety and Security. The review was carried out within the broader context of an ongoing program of assessments of the execution of implementation verification...

  10. Independent Oversight Review, Savannah River Operations Office...

    Energy Savers [EERE]

    at SRS from June 3 to 5, 2013. This report discusses the background, scope, methodology, results, and conclusions of the review, as well as opportunities for improvement...

  11. External Independent Review (EIR) Report Template | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Critical Decision (CD) 2, and a ConstructionExecution Readiness EIR for all Major System projects prior to CD-3. An EIR typically results in both a Draft and Final EIR Report. ...

  12. Independent Oversight Review, Waste Treatment and Immobilization Plant -

    Broader source: Energy.gov (indexed) [DOE]

    March 2013 | Department of Energy March 2013 Review of the Hanford Site Waste Treatment and Immobilization Plant Construction Quality The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security, conducted an independent review of selected aspects of construction quality at the Hanford Site Waste Treatment and Immobilization Plant (WTP). The review, which was performed November 26-30, 2012, was the latest in

  13. Independent Oversight Review, Los Alamos Field Office - March 2014 |

    Energy Savers [EERE]

    Department of Energy Field Office - March 2014 Independent Oversight Review, Los Alamos Field Office - March 2014 March 2014 Review of the Los Alamos Field Office Processes for Laboratory Oversight of Radiological Controls Activity-Level Implementation This report documents the results of an independent oversight review of National Nuclear Security Administration Los Alamos Field Office processes for laboratory oversight of radiological protection program activity-level implementation by Los

  14. Independent Oversight Review, Los Alamos National Laboratory - January 2013

    Energy Savers [EERE]

    | Department of Energy January 2013 Independent Oversight Review, Los Alamos National Laboratory - January 2013 January 2013 Review of the Los Alamos National Laboratory Corrective Action Effectiveness Review The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), evaluated the Los Alamos Site Office (LASO) safety system oversight (SSO) assessment of Los Alamos National Laboratory's (LANL) corrective actions to address prior

  15. Independent Oversight Review, Oak Ridge Transuranic Waste Processing

    Energy Savers [EERE]

    Center, September 2013 | Department of Energy Oak Ridge Transuranic Waste Processing Center, September 2013 Independent Oversight Review, Oak Ridge Transuranic Waste Processing Center, September 2013 September 2013 Review of Management of Safety Systems at the Oak Ridge Transuranic Waste Processing Center and Associated Feedback and Improvement Processes. This report documents the results of an independent oversight review of the management of safety significant structures, systems, and

  16. Independent Oversight Follow-up Review, Idaho Site - January 2014 |

    Office of Environmental Management (EM)

    Department of Energy Idaho Site - January 2014 Independent Oversight Follow-up Review, Idaho Site - January 2014 January 2014 Follow-up Review of Activity-Level Implementation of Radiation Controls and Radiological Work Planning at the Materials and Fuels Complex of the Idaho Site This report documents the results of an independent oversight review of radiation protection program (RPP) implementation at the Idaho Site conducted by the U.S. Department of Energy (DOE) Office of Enforcement and

  17. Independent Oversight Review, Los Alamos National Laboratory - April 2012 |

    Office of Environmental Management (EM)

    Department of Energy Laboratory - April 2012 Independent Oversight Review, Los Alamos National Laboratory - April 2012 April 2012 Review of the Consequence Assessment Program at the Los Alamos National Laboratory This report provides the results of an independent review of the Los Alamos National Laboratory emergency management consequence assessment program that was conducted February 7-9, 2012, by the Office of Safety and Emergency Management Evaluations within the Department of Energy's

  18. Independent Oversight Review, Los Alamos National Laboratory - December

    Office of Environmental Management (EM)

    2013 | Department of Energy December 2013 Independent Oversight Review, Los Alamos National Laboratory - December 2013 December 2013 Review of the Technical Area 55 Safety Class Fire Suppression System at Los Alamos National Laboratory This report documents the results of an independent oversight review of the Los Alamos National Laboratory (LANL) Technical Area 55 Plutonium Facility safety class fire suppression system (FSS), concurrent with a scheduled Los Alamos Field Office vital safety

  19. Independent Oversight Review, Los Alamos National Laboratory - January 2012

    Office of Environmental Management (EM)

    | Department of Energy January 2012 Independent Oversight Review, Los Alamos National Laboratory - January 2012 January 2012 Review of the Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility Fire Suppression System Tresults of an independent review of the Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility safety significant fire suppression system that was conducted May 1-13, 2011, by the Office of Health, Safety

  20. Independent Oversight Review, Los Alamos National Laboratory - May 2012 |

    Office of Environmental Management (EM)

    Department of Energy May 2012 Independent Oversight Review, Los Alamos National Laboratory - May 2012 May 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Los Alamos National Laboratory his report provides the results of an independent review of the Los Alamos National Laboratory's preparedness for severe natural phenomena events that was conducted by the U.S. Department of Energy's Office of Health, Safety and Security (HSS) in March 2012. The HSS Office of

  1. Independent Oversight Review, Los Alamos National Laboratory - November

    Office of Environmental Management (EM)

    2013 | Department of Energy November 2013 Independent Oversight Review, Los Alamos National Laboratory - November 2013 November 2013 Review of the Los Alamos National Laboratory Radiological Controls Activity-Level Implementation This report documents the results of an independent oversight review of radiological protection program activity-level implementation performed by Los Alamos National Security and its subcontractors at Los Alamos National Laboratory, Los Alamos Neutron Science

  2. Independent Oversight Review, Los Alamos National Laboratory Chemistry and

    Office of Environmental Management (EM)

    Metallurgy Research Facility - January 2012 | Department of Energy Laboratory Chemistry and Metallurgy Research Facility - January 2012 Independent Oversight Review, Los Alamos National Laboratory Chemistry and Metallurgy Research Facility - January 2012 January 2012 Review of the Los Alamos National Laboratory Chemistry and Metallurgy Research Facility Fire Suppression Vital Safety System This report provides the results of an independent review of the Los Alamos National Laboratory's

  3. Independent Oversight Review, National Energy Technology Laboratory - May

    Office of Environmental Management (EM)

    2014 | Department of Energy Energy Technology Laboratory - May 2014 Independent Oversight Review, National Energy Technology Laboratory - May 2014 May 2014 Review of the Emergency Management Program Technical Basis and Emergency Preparedness at the National Energy Technology Laboratory This report documents the results of an independent oversight review of the emergency management program technical basis and emergency preparedness at the National Energy Technology Laboratory Morgantown and

  4. Independent Oversight Review, Nevada Site Office - October 2011 |

    Office of Environmental Management (EM)

    Department of Energy Site Office - October 2011 Independent Oversight Review, Nevada Site Office - October 2011 October 2011 Review of Nevada Site Office Criticality Safety Assessments at the Criticality Experiments Facility and Training Assembly for Criticality Safety and Appraisal of the Criticality Experiments Facility Startup Plan This report provides the results of an independent oversight review of criticality safety assessment activities conducted by the Department of Energy's (DOE)

  5. Independent Oversight Review, Oak Ridge Transuranic Waste Processing

    Office of Environmental Management (EM)

    Facility - December 2013 | Department of Energy Oak Ridge Transuranic Waste Processing Facility - December 2013 Independent Oversight Review, Oak Ridge Transuranic Waste Processing Facility - December 2013 December 2013 Review of the Fire Protection Program and Fire Protection Systems at the Transuranic Waste Processing Center This report documents the results of an independent oversight review of the fire protection programs and systems at the Oak Ridge Transuranic Waste Processing Center.

  6. Independent Oversight Review, Rocky Flats Environmental Technology Site -

    Office of Environmental Management (EM)

    March 2000 | Department of Energy Rocky Flats Environmental Technology Site - March 2000 Independent Oversight Review, Rocky Flats Environmental Technology Site - March 2000 March 2000 Review of the Rocky Flats Environmental Technology Site Transportation Emergency Management Program This report provides the results of an independent review of the Transportation Emergency Management Program at the Department of Energy's Rocky Flats Environmental Technology Site that was conducted by the

  7. Independent Oversight Review, Savannah River Field Office Tritium

    Office of Environmental Management (EM)

    Facilities - November 2013 | Department of Energy Field Office Tritium Facilities - November 2013 Independent Oversight Review, Savannah River Field Office Tritium Facilities - November 2013 November 13, 2013 Review of Savannah River Field Office Tritium Facilities Radiological Controls Activity-Level Implementation This report documents the results of an independent oversight review of the radiological protection program at the Savannah River Site (SRS) tritium facilities implemented at the

  8. Independent Oversight Review, Savannah River Site Salt Waste Processing

    Office of Environmental Management (EM)

    Facility - August 2013 | Department of Energy Salt Waste Processing Facility - August 2013 Independent Oversight Review, Savannah River Site Salt Waste Processing Facility - August 2013 August 2013 Review of the Savannah River Site Salt Waste Processing Facility Safety Basis and Design Development. This report documents the results of an independent oversight review of the safety basis and design development for the Salt Waste Processing Facility (SWPF) at the U.S. Department of Energy (DOE)

  9. Independent engineering review of the Hanford Waste Vitrification System

    SciTech Connect (OSTI)

    Not Available

    1991-10-01

    The Hanford Waste Vitrification Plant (HWVP) was initiated in June 1987. The HWVP is an essential element of the plan to end present interim storage practices for defense wastes and to provide for permanent disposal. The project start was justified, in part, on efficient technology and design information transfer from the prototype Defense Waste Processing Facility (DWPF). Development of other serial Hanford Waste Vitrification System (HWVS) elements, such as the waste retrieval system for the double-shell tanks (DSTs), and the pretreatment system to reduce the waste volume converted into glass, also was required to accomplish permanent waste disposal. In July 1991, at the time of this review, the HWVP was in the Title 2 design phase. The objective of this technical assessment is to determine whether the status of the technology development and engineering practice is sufficient to provide reasonable assurance that the HWVP and the balance of the HWVS system will operate in an efficient and cost-effective manner. The criteria used to facilitate a judgment of potential successful operation are: vitrification of high-level radioactive waste from specified DSTs on a reasonably continuous basis; and glass produced with physical and chemical properties formally acknowledge as being acceptable for disposal in a repository for high-level radioactive waste. The criteria were proposed specifically for the Independent Engineering Review to focus that assessment effort. They are not represented as the criteria by which the Department will judge the prudence of the Project. 78 refs., 10 figs., 12 tabs.

  10. Enterprise Assessments Review, Idaho Cleanup Project - September 2014 |

    Office of Environmental Management (EM)

    Department of Energy Idaho Cleanup Project - September 2014 Enterprise Assessments Review, Idaho Cleanup Project - September 2014 September 2014 Review of the Idaho Cleanup Project Integrated Waste Treatment Unit Federal Readiness Assessment at the Idaho Site The U.S. Department of Energy (DOE) independent Office of Enterprise Assessments (EA) was established in May 2014 and assumed responsibility for managing the Department's Independent Oversight Program for the Department's former Office

  11. Independent Oversight Review, Savannah River Site- June 2012

    Broader source: Energy.gov [DOE]

    Review of Electrical System Configuration Management, Safety Instrumented System Commercial Grade Dedication, Setpoint Calculations, and Software Testing at the Savannah River Site, Waste Solidification Building Project

  12. 2015 Project Peer Review

    Broader source: Energy.gov [DOE]

    The Bioenergy Technologies Office is hosting the 2015 Peer Review on March 23–27, 2015, at the Hilton Mark Center, in Alexandria, Virginia.

  13. Independent Oversight Review, Department of Energy Contractor - August 2000

    Energy Savers [EERE]

    | Department of Energy Department of Energy Contractor - August 2000 Independent Oversight Review, Department of Energy Contractor - August 2000 August 2000 Review of Department of Energy Contractor Occupational Medicine Programs from December 1998 to June 1999 This report provides the results of a series of reviews of contractor occupational medicine programs that were conducted at eight Department of Energy (DOE) sites from September 1998 to December 1999. The reviews were conducted by the

  14. Independent Oversight Review, Hanford Waste Treatment and Immobilization

    Broader source: Energy.gov (indexed) [DOE]

    Plant - December 2013 | Department of Energy December 2013 Review of the Hanford Site Waste Treatment and Immobilization Plant Construction Quality This report documents the results of an independent oversight review of selected aspects of construction quality at the Hanford Site Waste Treatment and Immobilization Plant (WTP). The review, which was performed September 9-13, 2013, was the latest in a series of ongoing quarterly assessments of construction quality performed by the U.S.

  15. Independent Oversight Review, Waste Treatment and Immobilization Plant -

    Broader source: Energy.gov (indexed) [DOE]

    August 2011 | Department of Energy August 2011 Hanford Waste Treatment and Immobilization Plant Construction Quality This report documents the results of an independent oversight review of Construction Quality at the Hanford Site Waste Treatment and Immobilization Plant (WTP). The review was performed May 9-12, 2011, by the U.S. Department of Energy's (DOE) Office of Safety and Emergency Management Evaluations, which is within the DOE Office of Health, Safety and Security. This review is

  16. External Independent Review (EIR) Scoping Meeting Agreement Form...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review (EIR) prior to Critical Decision (CD) 2, and a ConstructionExecution Readiness EIR for all Major System projects prior to CD-3. The EIR Standard Operating Procedures ...

  17. Independent Oversight Special Review, Bechtel Jacobs Company, LLC - July

    Office of Environmental Management (EM)

    2011 | Department of Energy Bechtel Jacobs Company, LLC - July 2011 Independent Oversight Special Review, Bechtel Jacobs Company, LLC - July 2011 July 2011 Special Review of the Suspect/Counterfeit Items Program at the Bechtel Jacobs Company, LLC at the Oak Ridge Reservation This report provides the results of a special review of the of the Bechtel Jacobs Company, LLC (BJC) suspect/counterfeit items (S/CI) management system. This review was requested by the Manager of the U.S. Department of

  18. 2015 Project Peer Review | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Events » Meetings & Workshops » 2015 Project Peer Review 2015 Project Peer Review 2015 Project Peer Review The Bioenergy Technologies Office (BETO) held the 2015 Project Peer Review on March 23-27, 2015, at the Hilton Mark Center, in Alexandria, Virginia. Approximately 185 projects in BETO's research, development, and demonstration portfolio were presented to the public and systematically reviewed by external subject-matter experts from industry, academia, and federal agencies. The 2015

  19. Independent Oversight Review, Pantex Site Office - June 2012 | Department

    Office of Environmental Management (EM)

    of Energy Site Office - June 2012 Independent Oversight Review, Pantex Site Office - June 2012 June 2012 Review of the Pantex Site Office's Compliance with DOE Order 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities eview of the Pantex Site Office's (PXSO) compliance with DOE Order 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities. The review was performed onsite from April 2 to 5 and off site through April 24, 2012, by the U.S. Department

  20. Project Execution Plan Review Module (RM) | Department of Energy

    Office of Environmental Management (EM)

    Review Module (RM) Project Execution Plan Review Module (RM) The Project Execution Plan (PEP) Review Module (RM) is a tool that assists DOE federal project review teams in...

  1. Savannah River Site - Salt Waste Processing Facility Independent Technical Review

    Office of Environmental Management (EM)

    SALT WASTE PROCESSING FACILITY INDEPENDENT TECHNICAL REVIEW November 22, 2006 Conducted by: Harry Harmon, Team Lead Civil/Structural Sub Team Facility Safety Sub Team Engineering Sub Team Peter Lowry, Lead James Langsted, Lead George Krauter, Lead Robert Kennedy Chuck Negin Art Etchells Les Youd Jerry Evatt Oliver Block Loring Wyllie Richard Stark Tim Adams Tom Anderson Todd LaPointe Stephen Gosselin Carl Costantino Norman Moreau Patrick Corcoran John Christian Ken Cooper Kari McDaniel

  2. California - Establishing Transmission Project Review Streamlining...

    Open Energy Info (EERE)

    Regulatory Guidance - Supplemental Material: California - Establishing Transmission Project Review Streamlining DirectivesPermittingRegulatory GuidanceSupplemental Material...

  3. 2015 BALESŽ Project Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3, 2015 Technology Area Review Kevin Comer, Sr. Project Manager Antares Group, Inc. DOE Bioenergy Technologies Office (BETO) 2015 Project Peer Review 2015 "BALES" Project Review This presentation does not contain any proprietary, confidential, or otherwise restricted information Project Summary * 3 Year Development and Demonstration Project, Began Sept 2013 * Develop and demonstrate new and improved harvest and processing technologies that will reduce biomass supply chain costs while

  4. Gridley Biofuels Project Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Peer Review 1 Gridley Biofuels Project Technology Area Review: Thermochemical Conversion Dennis Schuetzle, REI International (REII), Sacramento, CA Matt Michaelis, City of Gridley, Gridley CA Alexandria, VA March 26, 2015 A Rice Field near the Sutter Butte Mountains in Northern CA Gridley Biofuels Project Gridley Sacramento Gridley is Centrally Located in the Northern Sacramento Valley 3 Project Goal The primary goal of this final phase (BP2) of the Gridley Biofuels Project during 2015

  5. 2008-10 "Independent Review of the MDA G CME Report by DOE Office...

    Office of Environmental Management (EM)

    10 "Independent Review of the MDA G CME Report by DOE Office of Groundwater and Soil Remediation" 2008-10 "Independent Review of the MDA G CME Report by DOE Office of Groundwater...

  6. Energy Independence and Security Act Six-Year Review of Covered...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independence and Security Act Six-Year Review of Covered Products Energy Independence and Security Act Six-Year Review of Covered Products This memorandum explains that the Energy ...

  7. Current (2009) State-of-the-Art Hydrogen Production Cost Estimate Using Water Electrolysis: Independent Review

    SciTech Connect (OSTI)

    Not Available

    2009-09-01

    This independent review examines DOE cost targets for state-of-the art hydrogen production using water electrolysis.

  8. Enterprise Assessments Review, West Valley Demonstration Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    review of activity-level implementation of the radiation protection program at the West Valley Demonstration Project. The onsite review was conducted during May 19-22 and June...

  9. Project Execution and Operational Readiness Reviews

    Broader source: Energy.gov [DOE]

    PMCDP is offering its annual delivery of the 3-day course, Project Execution and Operational Readiness Reviews, December 15-17, in Washington, D.C.

  10. Independent Oversight Review, DOE Nuclear Facilities- May 2013

    Broader source: Energy.gov [DOE]

    Lessons Learned from Targeted Reviews of Implementation Verification Review Processes at Department of Energy Nuclear Facilities

  11. Independent Oversight Review, Oak Ridge National Laboratory- January 2013

    Broader source: Energy.gov [DOE]

    Review of the Oak Ridge National Laboratory High Flux Isotope Reactor Implementation Verification Review Processes

  12. Independent Oversight Review, Plutonium Finishing Plant- July 2014

    Broader source: Energy.gov [DOE]

    Targeted Review of the Safety Significant Confinement Ventilation System and Review of Federal Assurance Capability at the Plutonium Finishing Plant

  13. Independent Oversight Review, Argonne National Laboratory- November 2011

    Broader source: Energy.gov [DOE]

    Review of the Argonne National Laboratory Alpha-Gamma Hot Cell Facility Readiness Assessment (Implementation Verification Review Sections)

  14. Final Report - Independent Confirmatory Survey Summary and Results for the Hematite Decommissioning Project

    SciTech Connect (OSTI)

    E.N. Bailey

    2009-03-18

    The objectives of the confirmatory surveys were to provide independent contractor field data reviews and to generate independent radiological data for use by the NRC in evaluating the adequacy and accuracy of the licensee’s procedures and survey results.

  15. INDEPENDENT VERIFICATION SURVEY REPORT FOR THE OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT

    SciTech Connect (OSTI)

    W.C. Adams

    2010-05-24

    INDEPENDENT VERIFICATION SURVEY REPORT FOR THE OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT, MIAMISBURG, OHIO DCN: 0468-SR-02-0

  16. INDEPENDENT VERIFICATION SURVEY REPORT OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT

    SciTech Connect (OSTI)

    W.C. Adams

    2010-07-21

    INDEPENDENT VERIFICATION SURVEY REPORT FOR THE OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT, MIAMISBURG, OHIO DCN: 0468-SR-03-0

  17. Midwest Independent Transmission System Operator Smart Grid Project...

    Open Energy Info (EERE)

    to optimize the dispatch and operation of power plants while improving the reliability of the bulk transmission system. This project deploys phasor measurement units...

  18. New York Independent System Operator, Inc. Smart Grid Project...

    Open Energy Info (EERE)

    capacitors across the New York transmission system. The project aims to improve the reliability of the transmission grid and prevent the spread of local outages to neighboring...

  19. Independent Oversight Activity Report for Review of Corrective...

    Office of Environmental Management (EM)

    of radiological posting and labeling, proper personal protective equipment doffing and contamination control, and response to abnormal operations. Result: Independent Oversight...

  20. Independent Oversight Targeted Review, Sandia National Laboratories – November 2013

    Broader source: Energy.gov [DOE]

    Targeted Review of Activity-Level Implementation of Radiological Controls at Sandia National Laboratories

  1. Independent Oversight Review, Hanford Tank Farms- November 2011

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of Hanford Tank Farms Safety Basis Amendment for Double-Shell Tank Ventilation System Upgrades

  2. Independent Oversight Review, Lawrence Livermore National Laboratory- September 2011

    Broader source: Energy.gov [DOE]

    Review of Integrated Safety Management System Effectiveness at Lawrence Livermore National Laboratory

  3. Independent Oversight Review, Idaho National Laboratory- September 2011

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of the Occupational Radiation Program as Implemented and Recently Enhanced at the Idaho National Laboratory

  4. Independent Oversight Review, Savannah River Site- September 2012

    Broader source: Energy.gov [DOE]

    Review of the Savannah River Site, Salt Waste Processing Facility, Construction Quality of Piping & Pipe Supports

  5. Independent Specific Administrative Controls Review, Richland Operations Office- December 2010

    Broader source: Energy.gov [DOE]

    Specific Administrative Controls Review with the Office of Environmental Management at DOE-Richland Operations Office

  6. Independent Oversight Review, Lawrence Livermore National Laboratory- August 2014

    Broader source: Energy.gov [DOE]

    Review of the Lawrence Livermore National Laboratory Radiological Controls Activity-Level Implementation.

  7. Independent Oversight Review, Hanford Site CH2M Hill Plateau Remediation

    Office of Environmental Management (EM)

    Company - November 2012 | Department of Energy CH2M Hill Plateau Remediation Company - November 2012 Independent Oversight Review, Hanford Site CH2M Hill Plateau Remediation Company - November 2012 November 2012 Review of the Hanford Site CH2M Hill Plateau Remediation Company Implementation Verification Review Processes This report documents the results of an independent review of the implementation verification review (IVR) processes employed by CH2M Hill Plateau Remediation Company at the

  8. A Review of Market Monitoring Activities at U.S. Independent System

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operators | Department of Energy A Review of Market Monitoring Activities at U.S. Independent System Operators A Review of Market Monitoring Activities at U.S. Independent System Operators Evaluate and report on market performance. Propose changes to rules to improve market operation and performance. Monitor compliance with the rules and apply mitigating measures and sanctions when applicable and authorized. PDF icon A Review of Market Monitoring Activities at U.S. Independent System

  9. Independent Oversight Review, Hanford Site K-West Annex Facility - April

    Office of Environmental Management (EM)

    2014 | Department of Energy K-West Annex Facility - April 2014 Independent Oversight Review, Hanford Site K-West Annex Facility - April 2014 April 2014 Review of the Hanford Site K-West Annex Facility Construction Quality The U.S. Department of Energy Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security, conducted an independent review of selected aspects of construction quality at the K-West Annex Facility. The onsite portion of the

  10. Independent Oversight Focused Review, Kansas City Plant, Summary...

    Broader source: Energy.gov (indexed) [DOE]

    1 Focused Review of Environment, Safety and Health and Emergency Management at the Kansas City Plant This report provides a summary of the results of a focused review of the...

  11. Independent Oversight Review, Oak Ridge Office- August 2011

    Broader source: Energy.gov [DOE]

    Review of the Oak Ridge Office Oversight of the Fire Protection Program at the Oak Ridge Reservation

  12. Independent Oversight Review, Waste Treatment and Immobilization Plant- December 2012

    Broader source: Energy.gov [DOE]

    Review of the Hanford Site Waste Treatment and Immobilization Plant Low Activity Waste Melter Process System Hazards Analysis Activity

  13. Independent Oversight Review, Los Alamos National Laboratory- January 2013

    Broader source: Energy.gov [DOE]

    Review of the Los Alamos National Laboratory Weapons Engineering Tritium Facility Tritium Gas Containment Vital Safety System

  14. Independent Oversight Review, URS CH2M Oak Ridge - June 2013...

    Broader source: Energy.gov (indexed) [DOE]

    Oak Ridge Environmental Management Radiological Controls Activity Level Implementation The purpose of this set of facility specific Independent Oversight targeted reviews is to...

  15. Independent Review of the July 8, 2010 Fatality at the Strategic...

    Energy Savers [EERE]

    Independent Review of the July 8, 2010 Fatality at the Strategic Petroleum Reserve Bryan Mound Site - May 25, 2011 Addendum closing the Investigation based upon the Galveston...

  16. Independent Oversight Review, Y-12 National Security Complex...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    captured, and implemented. It also assessed processes for maintaining configuration and change control of the related documents. PDF icon Review of the Uranium Processing...

  17. Independent Oversight Review, DOE/NNSA Nuclear Facilities- April 2013

    Broader source: Energy.gov [DOE]

    Lessons Learned from the 2012 Targeted Reviews of Emergency Preparedness for Severe Natural Phenomena Events at Select DOE/NNSA Nuclear Facilities

  18. Independent Oversight Review, Savannah River Site Tritium Facilities...

    Energy Savers [EERE]

    Management Evaluations performed this review to evaluate the processes for identifying emergency response capabilities and maintaining them in a state of readiness in case of a...

  19. Independent Oversight Review, Pacific Northwest National Laboratory- October 2012

    Broader source: Energy.gov [DOE]

    Review of the Department of Energy Office of Science Assessment of the Pacific Northwest National Laboratory Radiochemical Processing Laboratory Criticality Alarm System

  20. Independent Oversight Review, Oak Ridge Transuranic Waste Processing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ridge Transuranic Waste Processing Facility - December 2013 December 2013 Review of the Fire Protection Program and Fire Protection Systems at the Transuranic Waste Processing...

  1. Independent Oversight Review, Pacific Northwest National Laboratory- September 2013

    Broader source: Energy.gov [DOE]

    Review of the Fire Protection Program at Pacific Northwest National Laboratory and the Fire Suppression System at the Radiochemical Processing Laboratory

  2. Independent Oversight Targeted Review, Oak Ridge National Laboratory- April 2014

    Broader source: Energy.gov [DOE]

    Targeted Review of Radiological Controls Activity-Level Implementation at the Oak Ridge National Laboratory Radiochemical Engineering Development Center and High Flux Isotope Reactor Facilities

  3. Independent Oversight Review, Sandia Site Office - January 2013...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sandia Site Office - January 2013 January 2013 Review of the Sandia Site Office Quality Assurance Assessment of the Manzano Nuclear Operations The Office of Enforcement and...

  4. 2011 Annual Merit Review Results Report - Project and Program...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project and Program Statistics Calculations Overview 2011 Annual Merit Review Results Report - Project and Program Statistics Calculations Overview Merit review of DOE Vehicle...

  5. 2013 Annual Merit Review Results Report - Project and Program...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Merit Review Results Report - Project and Program Statistical Calculations Overview 2011 Annual Merit Review Results Report - Project and Program Statistics Calculations Overview...

  6. 2012 Annual Merit Review Results Report - Project and Program...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Merit Review Results Report - Project and Program Statistical Calculations Overview 2011 Annual Merit Review Results Report - Project and Program Statistics Calculations Overview...

  7. 2014 Annual Merit Review Results Report - Project and Program...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Merit Review Results Report - Project and Program Statistical Calculations Overview 2011 Annual Merit Review Results Report - Project and Program Statistics Calculations Overview...

  8. Independent Oversight Follow-up Review, Hanford Site - February...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2013 February 2013 Follow-up Review of the Hanford Site Chronic Beryllium Disease Prevention Program The U.S. Department of Energy (DOE) Office of Enforcement and Oversight...

  9. Independent Oversight Follow-up Review, Hanford Site - January...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2014 January 2014 Follow-up Review of the Hanford Site Chronic Beryllium Disease Prevention Program The U.S. Department of Energy (DOE) Office of Enforcement and Oversight...

  10. Full Reviews: Low-temperature and Exploration Demonstration Projects...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Low-temperature and Exploration Demonstration Projects Full Reviews: Low-temperature and Exploration Demonstration Projects Below are the project presentations and respective peer ...

  11. Voluntary Protection Program Onsite Review, Idaho Cleanup Project...

    Energy Savers [EERE]

    Idaho Cleanup Project- June 2007 Voluntary Protection Program Onsite Review, Idaho Cleanup Project- June 2007 June 2007 Evaluation to determine whether the Idaho Cleanup Project is...

  12. Full Reviews: Low-temperature and Exploration Demonstration Projects

    Broader source: Energy.gov [DOE]

    Below are the project presentations and respective peer review results for Low-temperature and Exploration Demonstration Projects. The peer review results for each project will be available soon.

  13. Project Execution Plan Review Module (RM) | Department of Energy

    Energy Savers [EERE]

    Execution Plan Review Module (RM) Project Execution Plan Review Module (RM) The Project Execution Plan (PEP) Review Module (RM) is a tool that assists DOE federal project review teams in evaluating the adequacy of the PEP development and maintenance for projects of any size and complexity. PDF icon Project Execution Plan RM More Documents & Publications Integrated Project Team RM Risk Management RM Decommissioning Plan RM

  14. Super Truck Program: Engine Project Review | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program: Engine Project Review Super Truck Program: Engine Project Review 2011 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer Evaluation PDF icon ace058_sisken_2011_o.pdf More Documents & Publications Super Truck -- 50% Improvement In Class 8 Freight Efficiency Vehicle Technologies Office Merit Review 2015: SuperTruck Program: Engine Project Review SuperTruck Program: Engine Project Review

  15. Independent Oversight Review, Babcock & Wilcox Technical Services Y-12, LLC- July 2012

    Broader source: Energy.gov [DOE]

    Review of the Long Lead Procurement Processed Used by Babcock & Wilcox Technical Services Y-12, LLC for the Uranium Processing Facility Project

  16. INDEPENDENT REVIEW OF THE X-701B GROUNDWATER REMEDY, PORTSMOUTH, OHIO: TECHNICAL EVALUATION AND RECOMMENDATIONS

    SciTech Connect (OSTI)

    Looney, B.; Eddy-Dilek, C.; Costanza, J.; Rossabi, J.; Early, T.; Skubal, K.; Magnuson, C.

    2008-12-15

    The Department of Energy Portsmouth Paducah Project Office requested assistance from Department of Energy Office of Environmental Management (EM-22) to provide independent technical experts to evaluate past and ongoing remedial activities at the Portsmouth facility that were completed to address TCE contamination associated with the X-701B groundwater plume and to make recommendations for future efforts. The Independent Technical Review team was provided with a detailed and specific charter. The charter requested that the technical team first review the past and current activities completed for the X-701B groundwater remedy for trichloroethene (TCE) in accordance with a Decision Document that was issued by Ohio EPA on December 8, 2003 and a Work Plan that was approved by Ohio EPA on September 22, 2006. The remedy for X-701B divides the activities into four phases: Phase I - Initial Source Area Treatment, Phase II - Expanded Source Area Treatment, Phase III - Evaluation and Reporting, and Phase IV - Downgradient Remediation and Confirmation of Source Area Treatment. Phase I of the remedy was completed during FY2006, and DOE has now completed six oxidant injection events within Phase II. The Independent Technical Review team was asked to evaluate Phase II activities, including soil and groundwater results, and to determine whether or not the criteria that were defined in the Work Plan for the Phase II end point had been met. The following criteria are defined in the Work Plan as an acceptable Phase II end point: (1) Groundwater samples from the identified source area monitoring wells have concentrations below the Preliminary Remediation Goal (PRG) for TCE in groundwater, or (2) The remedy is no longer effective in removing TCE mass from the source area. In addition, the charter specifies that if the Review Team determines that the Phase II endpoint has not been reached, then the team should address the following issues: (1) If additional injection events are recommended, the team should identify the type of injection and target soil horizon for these injections; (2) Consider the feasibility of declaring Technical Impracticability and proceeding with the RCRA Cap for the X-701B; and (3) Provide a summary of other cost-effective technologies that could be implemented (especially for the lower Gallia). The Independent Technical Review team focused its evaluation solely on the X-701B source zone and contaminant plume. It did not review current or planned remedial activities at other plumes, waste areas, or landfills at the Portsmouth site, nor did it attempt to integrate such activities into its recommendations for X-701B. However, the ultimate selection of a remedy for X-701B by site personnel and regulators should take into account potentially synergistic efforts at other waste areas. Assessment of remedial alternatives in the context of site-wide management practices may reveal opportunities for leveraging and savings that would not otherwise be identified. For example, the cost of source-zone excavation or construction of a permeable reactive barrier at X-701B might be substantially reduced if contaminated soil could be buried on site at an existing or planned landfill. This allowance would improve the feasibility and competitiveness of both remedies. A comprehensive examination of ongoing and future environmental activities across the Portsmouth Gaseous Diffusion Plant is necessary to optimize the selection and timing of X-701B remediation with respect to cleanup efficiency, safety, and economics. A selected group of technical experts attended the technical workshop at the Portsmouth Gaseous Diffusion Plant from November 18 through 21, 2008. During the first day of the workshop, both contractor and DOE site personnel briefed the workshop participants and took them on a tour of the X-701B site. The initial briefing was attended by representatives of Ohio EPA who participated in the discussions. On subsequent days, the team reviewed baseline data and reports, were provided additional technical information from site personne

  17. Background Information for Independent Review Team. Lifecycle Plan and FY14

    Office of Scientific and Technical Information (OSTI)

    Quarterly Reports (Technical Report) | SciTech Connect Background Information for Independent Review Team. Lifecycle Plan and FY14 Quarterly Reports Citation Details In-Document Search Title: Background Information for Independent Review Team. Lifecycle Plan and FY14 Quarterly Reports Abstract not provided. Authors: Lordi, V. [1] + Show Author Affiliations Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States) Publication Date: 2014-10-24 OSTI Identifier: 1178415 Report

  18. Independent Review of the July 8, 2010 Fatality at the Strategic Petroleum

    Office of Environmental Management (EM)

    Reserve Bryan Mound Site - May 25, 2011 Addendum closing the Investigation based upon the Galveston County Medical Examiner's Report | Department of Energy Independent Review of the July 8, 2010 Fatality at the Strategic Petroleum Reserve Bryan Mound Site - May 25, 2011 Addendum closing the Investigation based upon the Galveston County Medical Examiner's Report Independent Review of the July 8, 2010 Fatality at the Strategic Petroleum Reserve Bryan Mound Site - May 25, 2011 Addendum closing

  19. Advanced Sensors and Instrumentation Annual Project Review 2013 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Annual Project Review 2013 Advanced Sensors and Instrumentation Annual Project Review 2013 The Advanced Sensors and Instrumentation (ASI) element of the Nuclear Energy Enabling Technologies (NEET) program conducted its first Annual Project Review Meeting on May 21-22, 2013 in Germantown, Maryland. The purpose of this meeting was to review the status of the 10 ASI projects initiated in FY 2012. The meeting summary and project presentations are available here. PDF icon ASI

  20. 2015 Project Peer Review Program Booklet | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Peer Review Program Booklet 2015 Project Peer Review Program Booklet The Bioenergy Technologies Office (BETO) is hosting the 2015 Project Peer Review on March 23-27, 2015, at the Hilton Mark Center, in Alexandria, Virginia. The program booklet can be found below. PDF icon 2015_peer_review_program_booklet.pdf More Documents & Publications 2015 Project Peer Review Agenda At a Glance Bioproducts to Enable Biofuels Workshop Agenda Bioenergy 2015 Agenda

  1. Voluntary Protection Program Onsite Review, Waste Treatment Project...

    Office of Environmental Management (EM)

    Treatment Project - May 2006 Voluntary Protection Program Onsite Review, Waste Treatment Project - May 2006 May 2006 Evaluation of Intermech, Inc. activities at the Hanford Waste...

  2. Annual Energy Outlook Retrospective Review: Evaluation of 2014 and Prior Reference Case Projections

    Gasoline and Diesel Fuel Update (EIA)

    Annual Energy Outlook Retrospective Review: Evaluation of 2014 and Prior Reference Case Projections March 2015 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 U.S. Energy Information Administration | AEO Retrospective Review: Evaluation of 2014 and Prior Reference Case Projections i This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's

  3. 2011 Annual Merit Review Results Report - Project and Program Statistics

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Calculations Overview | Department of Energy Project and Program Statistics Calculations Overview 2011 Annual Merit Review Results Report - Project and Program Statistics Calculations Overview Merit review of DOE Vehicle Technologies research activities PDF icon 2011_amr_11.pdf More Documents & Publications 2013 Annual Merit Review Results Report - Project and Program Statistical Calculations Overview 2012 Annual Merit Review Results Report - Project and Program Statistical Calculations

  4. 2012 Annual Merit Review Results Report - Project and Program Statistical

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Calculations Overview | Department of Energy Project and Program Statistical Calculations Overview 2012 Annual Merit Review Results Report - Project and Program Statistical Calculations Overview Merit review of DOE Vehicle Technologies research activities PDF icon 2012_amr_11.pdf More Documents & Publications 2013 Annual Merit Review Results Report - Project and Program Statistical Calculations Overview 2014 Annual Merit Review Results Report - Project and Program Statistical

  5. 2014 Annual Merit Review Results Report - Project and Program Statistical

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Calculations Overview | Department of Energy Project and Program Statistical Calculations Overview 2014 Annual Merit Review Results Report - Project and Program Statistical Calculations Overview Merit review of DOE Vehicle Technologies research activities PDF icon 2014_amr_12.pdf More Documents & Publications 2013 Annual Merit Review Results Report - Project and Program Statistical Calculations Overview 2012 Annual Merit Review Results Report - Project and Program Statistical

  6. Recommendation 179: DOE Quarterly Project Reviews | Department of Energy

    Office of Environmental Management (EM)

    9: DOE Quarterly Project Reviews Recommendation 179: DOE Quarterly Project Reviews ORSSAB Recommendation to DOE on Providing Information in the DOE Quarterly Project Reviews. PDF icon Recommendation 179 PDF icon DOE response to recommendation 179 More Documents & Publications Recommendation 174: Quarterly Project Reviews Be Shared with the EM SSABs Recommendation 164: Recommendation on Engineering and Technology Development on the Oak Ridge Reservation EM SSAB Conference Calls - October 25,

  7. Reviewing Measurement and Verification Plans for Federal ESPC Projects |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Reviewing Measurement and Verification Plans for Federal ESPC Projects Reviewing Measurement and Verification Plans for Federal ESPC Projects Document provides a framework for implementing uniform and consistent reviews of measurement and verification plans for federal energy savings performance contract (ESPC) projects. PDF icon 6_3_reviewingmvplans.pdf More Documents & Publications Reviewing Post-Installation and Annual Reports for Federal ESPC Projects

  8. ESPC Project Review Comment Template | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review Comment Template ESPC Project Review Comment Template Template for project facilitator review of the preliminary assessment, investment-grade audit, commissioning plan, and other energy service company deliverables for an energy savings performance contract (ESPC). File p3-03review_comments_7.docx More Documents & Publications FEMP ESPC Project Development Resource Guide ESPC ENABLE ACQUISITION PLAN TEMPLATE Project Facilitation and Quality Assurance for Federal ESPCs

  9. 2013 Annual Merit Review Results Report - Project and Program Statistical

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Calculations Overview | Department of Energy Project and Program Statistical Calculations Overview 2013 Annual Merit Review Results Report - Project and Program Statistical Calculations Overview Merit review of DOE Vehicle Technologies research activities PDF icon 2013_amr_12.pdf More Documents & Publications 2012 Annual Merit Review Results Report - Project and Program Statistical Calculations Overview 2014 Annual Merit Review Results Report - Project and Program Statistical

  10. Microsoft Word - HABAdv#228_Independent Review of BerylliumProgram.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HAB Consensus Advice # 228 Subject: Independent Review of Beryllium Program Adopted: February 5, 2010 Page 1 February 5, 2010 Inés Triay, Assistant Secretary for Environmental Management EM-1/Forestal Building U.S. Department of Energy 1000 Independence Avenue Washington, D.C. 20585 Steven Krahn, Deputy Assistance Secretary U.S. Department of Energy, Office of Health, Safety and Security HS-10 / GTN 1000 Independence Avenue, SW Washington, D.C. 20585 David Brockman, Manager U.S. Department of

  11. LETTER REPORT INDEPENDENT VERIFICATION OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT FAN HOUSE, BUILDING 704 BNL

    SciTech Connect (OSTI)

    P.C. Weaver

    2010-10-22

    5098-LR-01-0 -LETTER REPORT INDEPENDENT VERIFICATION OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT FAN HOUSE, BUILDING 704 BROOKHAVEN NATIONAL LABORATORY

  12. INDEPENDENT VERIFICATION SURVEY OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT OUTSIDE AREAS BROOKHAVEN NATIONAL LABORATORY UPTON, NEW YORK

    SciTech Connect (OSTI)

    P.C. Weaver

    2010-12-15

    5098-SR-03-0 FINAL REPORT- INDEPENDENT VERIFICATION SURVEY OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT OUTSIDE AREAS, BROOKHAVEN NATIONAL LABORATORY

  13. Advanced Sensors and Instrumentation Project Review Webinar 2014 |

    Energy Savers [EERE]

    Department of Energy Project Review Webinar 2014 Advanced Sensors and Instrumentation Project Review Webinar 2014 The Nuclear Energy Enabling Technologies (NEET) Advanced Sensors and Instrumentation (ASI) program, in coordination with the Office of Nuclear Reactor Technologies and the Office of Fuel Cycle Technologies, conducted an Instrumentations and Controls (I&C) project review webinar on September 16-18, 2014. The purpose of this webinar was to review the status of the I&C

  14. Independent Technical Review of the X-740 Groundwater Remedy, Portsmouth, Ohio: Technical Evaluation and Recommendations

    SciTech Connect (OSTI)

    Looney, B.; Rhia, B.; Jackson, D.; Eddy-Dilek, C.

    2010-04-30

    Two major remedial campaigns have been applied to a plume of trichloroethene (TCE) contaminated groundwater near the former X-740 facility at the Portsmouth Gaseous Diffusion Plant in Piketon Ohio. The two selected technologies, phytoremediation using a stand of hybrid poplar trees from 1999-2007 and in situ chemical oxidation using modified Fenton's Reagent from 2008-2009, have proven ineffective in achieving remedial action objectives (RAOs). The 'poor' performance of these technologies is a direct result of site specific conditions and the local contaminant hydrogeology. Key among these challenges is the highly heterogeneous subsurface geology with a thin contaminated aquifer zone (the Gallia) - the behavior of the contamination in the Gallia is currently dominated by slow release of TCE from the clay of the overlying Minford formation, from the sandstone of the underlying Berea formation, and from clayey layers within the Gallia itself. In response to the remediation challenges for the X-740 plume, the Portsmouth team (including the US Department of Energy (DOE), the site contractor (CDM), and the Ohio Environmental Protection Agency (OEPA)) is evaluating the feasibility of remediation at this site and identifying specific alternatives that are well matched to site conditions and that would maximize the potential for achieving RAOs. To support this evaluation, the DOE Office of Groundwater and Soil Remediation (EM-32) assembled a team of experts to serve as a resource and provide input and recommendations to Portsmouth. Despite the challenging site conditions and the failure of the previous two remediation campaigns to adequately move the site toward RAOs, the review team was unanimous in the conclusion that an effective combination of cost effective technologies can be identified. Further, the team expressed optimism that RAOs can be achieved if realistic timeframes are accepted by all parties. The initial efforts of the review team focused on reviewing the site history and data and organizing the information into a conceptual model and findings to assist in evaluating the potential of alternative remediation technologies. Examples of the key conceptual findings of the EM-32 review team were: (1) The Gallia represents the most practical target for deployment of in situ remediation treatment reagents - injection/extraction focused in this zone would provide maximum lateral impacts with minimal potential risk of failure or adverse collateral impacts. (2) The slow release of TCE from clay and sandstone into the Gallia represent a long term source of TCE that can re-contaminate the Gallia in the future - technologies that effectively treat the permeable portions of the Gallia, but do not leave residual treatment capacity in the system are unlikely to achieve long term remedial action objectives. CDM, the site contractor, provided important and useful information documenting the status and preliminary results of the on-site technology alternative evaluation. In the CDM evaluation, potential technologies were either retained (or screened out) in two preliminary evaluation phases and a detailed evaluation was performed on the five alternatives that were retained into the final 'detailed analysis' phase. The five alternatives that were included in the detailed analysis were: (1) hydraulic fracturing with EHC (a solid bioremediation amendment), (2) enhanced anaerobic bioremediation, (3) in situ chemical oxidation, (4) electrical resistance heating, and (5) reactive barriers. In several cases, two or three variants were separately evaluated. The review team found the CDM effort to be generally credible and reasonable. Thus, the review team focused on providing additional considerations and inputs to Portsmouth and on amending and refining the alternatives in ways that might improve performance and/or reduce costs. The Department of Energy Portsmouth Paducah Project Office requested assistance from Department of Energy Office of Environmental Management (EM-32) to provide an independent technical panel to review previous and o

  15. Independent Oversight Review of the Employee Concerns Program at the Savannah River Operations Office, July 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Oversight Review of the Employee Concerns Program at the Savannah River Operations Office May 2011 February 2013 July 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U. S. Department of Energy Table of Contents 1.0 Purpose.................................................................................................................................................... 1 2.0 Background

  16. Independent Oversight Targeted Review of the Sandia National Laboratories Federal Assurance Capability, April 2014

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Oversight Targeted Review of the Sandia National Laboratories Federal Assurance Capability April 2014 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................ 1 2.0 Scope...

  17. Independent Oversight Review of the Hanford Site K-West Annex Facility Construction Quality, April 2014

    Energy Savers [EERE]

    Independent Oversight Review of the Hanford Site K-West Annex Facility Construction Quality April 2014 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U. S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Scope

  18. Independent Oversight Review of Integrated Safety Management System Effectiveness at the Livermore Site Office, October 2011

    Office of Environmental Management (EM)

    Health, Safety and Security Office of Enforcement and Oversight Independent Oversight Review of Integrated Safety Management System Effectiveness at the Livermore Site Office October 2011 Office of Safety and Emergency Management Evaluations Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ............................................................................................................................................. 1 2.0 Background

  19. Energy Design Assistance Project Tracker - 2014 BTO Peer Review |

    Office of Environmental Management (EM)

    Department of Energy Design Assistance Project Tracker - 2014 BTO Peer Review Energy Design Assistance Project Tracker - 2014 BTO Peer Review Presenter: Larry Brackney, National Renewable Energy Laboratory The Energy Design Assistance Program Tracker (EDAPT) tracks and manages projects, performs automated quality checks of energy model designs, and generates project documentation and reports for commercial buildings. The ultimate goal of this project is to develop cost control best practice

  20. U.S. Department of Energy Project Review Guide for Capital Asset Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-23

    This Guide addresses the various project reviews conducted during the life-cycle of a project based on the stage, complexity and duration of a project. This Guide describes typical reviews, the purpose of each, the timing during the project life-cycle, lines of inquiry, and required documentation. No cancellations.

  1. Annual Merit Review Evaluates Impact of Sustainable Transportation Projects

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Annual Merit Review Evaluates Impact of Sustainable Transportation Projects Annual Merit Review Evaluates Impact of Sustainable Transportation Projects June 5, 2015 - 11:32am Addthis A vehicle undergoes dynamometer testing at Argonne National Laboratory's Advanced Powertrain Research Facility in Illinois. The project is one of many that is being evaluated at the Vehicle Technologies Office and Hydrogen and Fuel Cells Program Annual Merit Review and Peer Evaluation

  2. Vehicle Technologies Office Merit Review 2014: EV Project: Solar...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vehicle Technologies Office Merit Review 2014: EV Project: Solar-Assisted Charging Demo Presentation given by Oak Ridge National Laboratory at 2014 DOE Hydrogen and Fuel Cells ...

  3. Independent Activity Report, Richland Operations Office - April...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Independent Activity Report, Richland Operations Office - April 2011 April 2011 Operational Awareness Review of the Hanford Sludge Treatment Project HIAR-RL-2011-04-07 This...

  4. Independent Activity Report, Hanford - November 2010 | Department...

    Broader source: Energy.gov (indexed) [DOE]

    0 Hanford Tour and Review of the Office of River Protection Waste Treatment Immobilization Project Construction Site The U.S. Department of Energy Office of Independent Oversight,...

  5. A Compilation and Review of Alaska Energy Projects

    SciTech Connect (OSTI)

    Arlon Tussing; Steve Colt

    2008-12-31

    There have been many energy projects proposed in Alaska over the past several decades, from large scale hydro projects that have never been built to small scale village power projects to use local alternative energy sources, many of which have also not been built. This project was initially intended to review these rejected projects to evaluate the economic feasibility of these ideas in the light of current economics. This review included contacting the agencies responsible for reviewing and funding these projects in Alaska, including the Alaska Energy Authority, the Denali Commission, and the Arctic Energy Technology Development Laboratory, obtaining available information about these projects, and analyzing the economic data. Unfortunately, the most apparent result of this effort was that the data associated with these projects was not collected in a systematic way that allowed this information to be analyzed.

  6. Enterprise Assessments, Review of the Hanford Site Sludge Treatment Project

    Office of Environmental Management (EM)

    Engineered Container Retrieval and Transfer System Preliminary Documented Safety Analysis, Revision 00 - April 2015 | Department of Energy Assessments, Review of the Hanford Site Sludge Treatment Project Engineered Container Retrieval and Transfer System Preliminary Documented Safety Analysis, Revision 00 - April 2015 Enterprise Assessments, Review of the Hanford Site Sludge Treatment Project Engineered Container Retrieval and Transfer System Preliminary Documented Safety Analysis, Revision

  7. DOE Progress Review of the MINERvA Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Progress Review of the MINERvA Project Main INjector ExpeRiment v-A September 12, 2008 | Overview | CD-3b Documentation| Other Documents| Overview of Charge and Experiment MINERvA Overview (pdf) Review Agenda (pdf) Review Charge (pdf) Review Presentations by MINERvA Project Team Project Overview (pdf) Scintillators (WBS 1.0) WLS Fibers (WBS 2.0) and Clear Fiber Cables (WBS 4.0) (pdf) Phototubes (WBS 6.0) PMT Housing (WBS 5.0) and Electronics and DAQ (WBS 7.0) (pdf) Scintillator Plane Assembly

  8. SuperTruck Program: Engine Project Review

    Broader source: Energy.gov [DOE]

    2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

  9. Voluntary Protection Program Onsite Review, River Corridor Closure Project

    Office of Environmental Management (EM)

    - June 2012 | Department of Energy River Corridor Closure Project - June 2012 Voluntary Protection Program Onsite Review, River Corridor Closure Project - June 2012 June 2012 Evaluation to determine whether River Corridor Closure Project is continuing to perform at a level deserving DOE-VPP Star recognition. The Team conducted its review during June 11 - 14, 2012 to determine whether Washington Closure Hanford, LLC is continuing to perform at a level deserving DOE-VPP Star recognition. PDF

  10. U.S. Department of Energy Project Review Guide for Capital Asset Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-23

    This guide is a tool for Federal Project Directors (FPD) and Federal Program Managers in planning and preparing for appropriate reviews as an integral part of the project planning and implementation cycle.

  11. 2008-10 "Independent Review of the MDA G CME Report by DOE Office of Groundwater and Soil Remediation"

    Broader source: Energy.gov [DOE]

    Approved November 19, 2008 The intent of this recommendation is to perform an independent and informed review of the MDA G CME which can be referenced by LANL in their discussions with NMED during the NMED acceptance review. This independent review can also provide information for the NNMCAB in our public communication interfaces explaining the methods of option assessment for MDA G and any relationships to other DOE restoration sites.

  12. SuperTruck Program: Engine Project Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Year 4 (PY4) BTE Improvement 2.1% Further increase in compression ratio (CR), piston bowl and matching injector profile optimization. Third iteration of...

  13. DOE CD-4 Review of the MINERvA Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE CD-4 Review of the MINERvA Project Main INjector ExpeRiment v-A May 12, 2010 | Overview | CD-4 Documentation| Other Documents| Overview of Charge and Experiment MINERvA Overview (2.2 MB pdf) Review Agenda (all times EDT) (pdf) Review Charge (pdf) Review Presentation by MINERvA Project (DRAFT until the week of May 12) (docdb page) Required CD-4 Documentation CD-4 Document Checklist (pdf) Technical Requirements Completion Document (pdf) Quality Assurance Plan (pdf) Safety Documentation Hazard

  14. DOE Hydrogen Pipeline R&D Project Review Meeting

    Broader source: Energy.gov [DOE]

    On January 5th and 6th, 2005, the FreedomCAR and Fuels Partnership Hydrogen Delivery Tech Team hosted a project review meeting at Oak Ridge National Laboratory in Oak Ridge, Tennessee. The invitees...

  15. 2010 Solar Program Peer Review Report: An Independent Evaluation of Program Activities for FY2009 and FY2010

    SciTech Connect (OSTI)

    DOE Solar Energy Technologies Program

    2010-12-01

    This document summarizes the recommendations and evaluations provided by an independent external panel of experts at the DOE Solar Energy Technologies Program's 2010 Program Review meeting, held on May 24?27, 2010, in Washington, D.C.

  16. Biological Lignin Depolymerization Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE BioEnergy Technologies Office (BETO) Project Peer Review Date: March 25 th , 2015 Technology Review Area: Biochemical Conversion Biological Lignin Depolymerization (WBS 2.3.2.100) Principal Investigators: Gregg Beckham (NREL) John Gladden (SNL) Organizations: National Renewable Energy Laboratory and Sandia National Laboratory 2 | Bioenergy Technologies Office Project Goal Residual Biorefinery Lignin Goal and Outcome: develop a biological approach to depolymerize solid lignin for upgrading

  17. 2015 Project Peer Review Agenda At a Glance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Project Peer Review Agenda At a Glance 2015 Project Peer Review Agenda At a Glance The Bioenergy Technologies Office (BETO) is hosting the 2015 Project Peer Review on March...

  18. Independent Review of AFC 2A, 2B, and 2E ATR Irradiation Tests

    SciTech Connect (OSTI)

    M. Cappiello; R. Hobbins; K. Penny; L. Walters

    2014-01-01

    As part of the Department of Energy Advanced Fuel Cycle program, a series of fuels development irradiation tests have been performed in the Advanced Test Reactor (ATR) at the Idaho National Laboratory. These tests are providing excellent data for advanced fuels development. The program is focused on the transmutation of higher actinides which best can be accomplished in a sodium-cooled fast reactor. Because a fast test reactor is no longer available in the US, a special test vehicle is used to achieve near-prototypic fast reactor conditions (neutron spectra and temperature) for use in ATR (a water-cooled thermal reactor). As part of the testing program, there were many successful tests of advanced fuels including metals and ceramics. Recently however, there have been three experimental campaigns using metal fuels that experienced failure during irradiation. At the request of the program, an independent review committee was convened to review the post-test analyses performed by the fuels development team, to assess the conclusions of the team for the cause of the failures, to assess the adequacy and completeness of the analyses, to identify issues that were missed, and to make recommendations for improvements in the design and operation of future tests. Although there is some difference of opinion, the review committee largely agreed with the conclusions of the fuel development team regarding the cause of the failures. For the most part, the analyses that support the conclusions are sufficient.

  19. Voluntary Protection Program Onsite Review, Idaho Cleanup Project- June

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2007 | Department of Energy Idaho Cleanup Project- June 2007 Voluntary Protection Program Onsite Review, Idaho Cleanup Project- June 2007 June 2007 Evaluation to determine whether the Idaho Cleanup Project is continuing to perform at a level deserving DOE-VPP Star recognition. This report summarizes the results of the HSS DOE-VPP Team's evaluation of Facilities Engineering Services KCP, LLC during the period of June 4-15, 2007, and provides the Chief Health, Safety and Security Officer with

  20. Spent Nuclear Fuel (SNF) Project Cask and MCO Helium Purge System Design Review Completion Report Project A.5 and A.6

    SciTech Connect (OSTI)

    ARD, K.E.

    2000-04-19

    This report documents the results of the design verification performed on the Cask and Multiple Canister Over-pack (MCO) Helium Purge System. The helium purge system is part of the Spent Nuclear Fuel (SNF) Project Cask Loadout System (CLS) at 100K area. The design verification employed the ''Independent Review Method'' in accordance with Administrative Procedure (AP) EN-6-027-01.

  1. Reviews and Validations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reviews and Validations Reviews and Validations External Independent Review (EIR) Procedures Under DOE O 413.3B, Program and Project Management for the Acquisition of Capital ...

  2. US-VISIT Independent Verification and Validation Project: Test Bed Establishment Report

    SciTech Connect (OSTI)

    Jensen, N W; Gansemer, J D

    2011-01-21

    This document describes the computational and data systems available at the Lawrence Livermore National Laboratory for use on the US-VISIT Independent Verification and Validation (IV&V) project. This system - composed of data, software and hardware - is designed to be as close as a representation of the operational ADIS system as is required to verify and validate US-VISIT methodologies. It is not required to reproduce the computational capabilities of the enterprise-class operational system. During FY10, the test bed was simplified from the FY09 version by reducing the number of database host computers from three to one, significantly reducing the maintenance and overhead while simultaneously increasing system throughput. During the current performance period, a database transfer was performed as a set of Data Pump Export files. The previous RMAN backup from 2007 required the availability of an AIX system which is not required when using data pump. Due to efficiencies in the new system and process, loading of the database refresh was able to be accomplished in a much shorter time frame than was previously required. The FY10 Oracle Test Bed now consists of a single Linux platform hosting two Oracle databases including the 2007 copy as well as the October 2010 refresh.

  3. Independent Review of Simulation of Net Infiltration for Present-Day and Potential Future Climates

    SciTech Connect (OSTI)

    Review Panel: Soroosh Sorooshian, Ph.D., Panel Chairperson, University of California, Irvine; Jan M. H. Hendrickx, Ph.D., New Mexico Institute of Mining and Technology; Binayak P. Mohanty, Ph.D., Texas A&M University; Scott W. Tyler, Ph.D., University of Nevada, Reno; Tian-Chyi Jim Yeh, Ph.D., University of Arizona -- ORISE Review Facilitators: Robert S. Turner, Ph.D., Technical Review Group Manager, Oak Ridge Institute for Science and Education; Brian R. Herndon, Project Manager, Oak Ridge Institute for Science and Education; Russ Manning, Technical Writer/Editor, Haselwood Enterprises, Inc.

    2008-08-30

    The DOE Office of Civilian Radioactive Waste Management (OCRWM) tasked Oak Ridge Institute for Science and Education (ORISE) with providing an independent expert review of the documented model and prediction results for net infiltration of water into the unsaturated zone at Yucca Mountain. The specific purpose of the model, as documented in the report MDL-NBS-HS-000023, Rev. 01, is “to provide a spatial representation, including epistemic and aleatory uncertainty, of the predicted mean annual net infiltration at the Yucca Mountain site ...” (p. 1-1) The expert review panel assembled by ORISE concluded that the model report does not provide a technically credible spatial representation of net infiltration at Yucca Mountain. Specifically, the ORISE Review Panel found that: • A critical lack of site-specific meteorological, surface, and subsurface information prevents verification of (i) the net infiltration estimates, (ii) the uncertainty estimates of parameters caused by their spatial variability, and (iii) the assumptions used by the modelers (ranges and distributions) for the characterization of parameters. The paucity of site-specific data used by the modeling team for model implementation and validation is a major deficiency in this effort. • The model does not incorporate at least one potentially important hydrologic process. Subsurface lateral flow is not accounted for by the model, and the assumption that the effect of subsurface lateral flow is negligible is not adequately justified. This issue is especially critical for the wetter climate periods. This omission may be one reason the model results appear to underestimate net infiltration beneath wash environments and therefore imprecisely represent the spatial variability of net infiltration. • While the model uses assumptions consistently, such as uniform soil depths and a constant vegetation rooting depth, such assumptions may not be appropriate for this net infiltration simulation because they oversimplify a complex landscape and associated hydrologic processes, especially since the model assumptions have not been adequately corroborated by field and laboratory observations at Yucca Mountain.

  4. FINAL REPORT INDEPENDENT VERIFICATION SURVEY SUMMARY AND RESULTS FOR THE ARGONNE NATIONAL LABORATORY BUILDING 330 PROJECT FOOTPRINT, ARGONNE, ILLINOIS

    SciTech Connect (OSTI)

    ERIKA N. BAILEY

    2012-02-29

    ORISE conducted onsite verification activities of the Building 330 project footprint during the period of June 6 through June 7, 2011. The verification activities included technical reviews of project documents, visual inspections, radiation surface scans, and sampling and analysis. The draft verification report was issued in July 2011 with findings and recommendations. The contractor performed additional evaluations and remediation.

  5. U.S. Department of Energy Project Review Guide for Capital Asset...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9, U.S. Department of Energy Project Review Guide for Capital Asset Projects by John Makepeace Functional areas: Program Management, Project Management This Guide addresses the...

  6. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Carl Wharton

    2009-10-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  7. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Carl Wharton; Kent Norris

    2009-12-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  8. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Carl Wharton; Kent Norris

    2010-03-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  9. DOE Bioenergy Technologies Office (BETO) 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Feedstock Supply Chain Analysis WBS #:1.1.1.2 March 25, 2015 Jake Jacobson Idaho National Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information Feedstocks Platform DOE Bioenergy Technologies Office (BETO) 2015 Project Peer Review 2 | Bioenergy Technologies Office Goal Statement Connecting the Nation's Diverse Biomass Resources to the Bioenergy Industry The primary purpose of this project is to provide technical analysis support to the

  10. Targeted Microbial Development Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Targeted Microbial Development Date: March 23-27 Technology Area Review: Biochemical Platform Principal Investigator: Michael E. Himmel Task Leads: Min Zhang & Gregg Beckham Organization: NREL This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal Statement * Present the goal of this project and describe how the project fits with the goals/objectives of the Technology Area and ultimately the goals/objectives of the DOE Bioenergy

  11. Independent Oversight Review, Oak Ridge Office of Environmental Management- February 2012

    Broader source: Energy.gov [DOE]

    Review of the Implementation Verification Review Processes at the Oak Ridge Office of Environmental Management for Building 3019

  12. Lignin Utilization Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lignin Utilization WBS 2.3.4.100 2015 DOE BioEnergy Technologies Office (BETO) Project Peer Review Date: March 24 th , 2015 Technology Area Review: Biochemical Conversion Principal Investigator: Gregg T. Beckham Organization: National Renewable Energy Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 Goal Statement Goal: develop viable processes to produce valuable co-products from lignin * Contribute to 2022 cost targets in

  13. DOE Issues Environmental Assessment on Road Project for Public Review

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Brad Bugger (208) 526-0833 DOE Issues Environmental Assessment on Road Project for Public Review The U.S. Department of Energy has issued for public review and comment a draft environmental assessment of the potential environmental impacts of building an internal road to safely ship radioactive material within the Idaho National Laboratory. DOE�s preferred alternative under the environmental assessment is to develop a new, internal road that would connect the Idaho Nuclear Technology and

  14. Computational Pyrolysis Consortium for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Computational Pyrolysis Consortium This presentation does not contain any proprietary, confidential, or otherwise restricted information DOE Bioenergy Technologies Office (BETO) 2015 Project Peer Review Biotechnology Area Review C. Stuart Daw (PI) March 23-27, 2015 2 * Through computational modeling, enable BETO experimental groups to attain 2017/2022 technical targets faster and more efficiently - FY2017: Accelerate 2017 vapor-phase upgrading demonstration; Guide development of 50% longer life

  15. Bench Scale Integration Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bench Scale Integration WBS 2.4.1.100 2015 DOE BioEnergy Technologies Office (BETO) Project Peer Review Date: March 25, 2015 Technology Area Review: Biochemical Conversion Principal Investigator: Nancy Dowe (Rick Elander, presenter) Organization: National Renewable Energy Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 Goal Statement Goal is to demonstrate, at bench scale, an integrated process to produce HC fuel and a model

  16. Materials and process engineering projects for the Sandia National Laboratories/Newly Independent States Industrial Partnering Program. Volume 1

    SciTech Connect (OSTI)

    Zanner, F.J.; Moffatt, W.C.

    1995-07-01

    In July, 1994, a team of materials specialists from Sandia and U S Industry traveled to Russia and the Ukraine to select and fund projects in materials and process technology in support of the Newly Independent States/Industrial Partnering Program (NIS/IPP). All of the projects are collaborations with scientists and Engineers at NIS Institutes. Each project is scheduled to last one year, and the deliverables are formatted to supply US Industry with information which will enable rational decisions to be made regarding the commercial value of these technologies. This work is an unedited interim compilation of the deliverables received to date.

  17. Materials and process engineering projects for the Sandia National Laboratories/Newly Independent States Industrial Partnering Program. Volume 2

    SciTech Connect (OSTI)

    Zanner, F.J.; Moffatt, W.C.

    1995-07-01

    In July, 1994, a team of materials specialists from Sandia and US. Industry traveled to Russia and the Ukraine to select and fund projects in materials and process technology in support of the Newly Independent States/Industrial Partnering Program (NIS/IPP). All of the projects are collaborations with scientists and Engineers at NIS Institutes. Each project is scheduled to last one year, and the deliverables are formatted to supply US. Industry with information which will enable rational decisions to be made regarding the commercial value of these technologies. This work is an unedited interim compilation of the deliverables received to date.

  18. 2008 Annual Merit Review Results Summary - 18. Cross-Reference of Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Investigators, Projects, and Organizations | Department of Energy 8. Cross-Reference of Project Investigators, Projects, and Organizations 2008 Annual Merit Review Results Summary - 18. Cross-Reference of Project Investigators, Projects, and Organizations DOE Vehicle Technologies Annual Merit Review PDF icon 2008_merit_review_18.pdf More Documents & Publications 2010 Annual Merit Review Results Cross Reference of PIs and Organizations DOE Vehicle Technologies Program 2009 Merit Review

  19. Independent Verification Survey Report for the Operable Unit-1 Miamisburg Closure Project, Miamisburg, OH

    SciTech Connect (OSTI)

    Weaver, P.

    2008-03-17

    The objectives of the independent verification survey were to confirm that remedial actions have been effective in meeting established release criteria and that documentation accurately and adequately describes the current radiological and chemical conditions of the MCP site.

  20. PROJECT PROFILE: Council of Independent Colleges in Virginia (Solar Market Pathways)

    Broader source: Energy.gov [DOE]

    Title: A Solar Market Pathway for Independent Colleges in Virginia Funding Opportunity: Solar Market PathwaysSunShot Subprogram: Soft CostsLocation: Bedford, VAAmount Awarded: $807,563Awardee Cost...

  1. Baseline review of the U.S. LHC Accelerator project

    SciTech Connect (OSTI)

    1998-02-01

    The Department of Energy (DOE) Review of the U.S. Large Hadron Collider (LHC) Accelerator project was conducted February 23--26, 1998, at the request of Dr. John R. O`Fallon, Director, Division of High Energy Physics, Office of Energy Research, U.S. DOE. This is the first review of the U.S. LHC Accelerator project. Overall, the Committee found that the U.S. LHC Accelerator project effort is off to a good start and that the proposed scope is very conservative for the funding available. The Committee recommends that the project be initially baselined at a total cost of $110 million, with a scheduled completion data of 2005. The U.S. LHC Accelerator project will supply high technology superconducting magnets for the interaction regions (IRs) and the radio frequency (rf) straight section of the LHC intersecting storage rings. In addition, the project provides the cryogenic support interface boxes to service the magnets and radiation absorbers to protect the IR dipoles and the inner triplet quadrupoles. US scientists will provide support in analyzing some of the detailed aspects of accelerator physics in the two rings. The three laboratories participating in this project are Brookhaven National Laboratory, Fermi National Accelerator Laboratory (Fermilab), and Lawrence Berkeley National Laboratory. The Committee was very impressed by the technical capabilities of the US LHC Accelerator project team. Cost estimates for each subsystem of the US LHC Accelerator project were presented to the Review Committee, with a total cost including contingency of $110 million (then year dollars). The cost estimates were deemed to be conservative. A re-examination of the funding profile, costs, and schedules on a centralized project basis should lead to an increased list of deliverables. The Committee concluded that the proposed scope of US deliverables to CERN can be readily accomplished with the $110 million total cost baseline for the project. The current deliverables should serve as the baseline scope with the firm expectation that additional scope will be restored to the baseline as the project moves forward. The Committee supports the FY 1998 work plan and scope of deliverables but strongly recommends the reevaluation of costs and schedules with the goal of producing a plan for restoring the US deliverables to CERN. This plan should provide precise dates when scope decisions must be made.

  2. 2012 Annual Merit Review Results Report - Cross-Reference of Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Investigtors, Projects, and Organizations | Department of Energy Cross-Reference of Project Investigtors, Projects, and Organizations 2012 Annual Merit Review Results Report - Cross-Reference of Project Investigtors, Projects, and Organizations Merit review of DOE Vehicle Technologies research activities PDF icon 2012_amr_10.pdf More Documents & Publications 2013 Annual Merit Review Results Report - Cross-Reference of Project Investigators, Projects, and Organizations 2014 Annual Merit

  3. 2014 Annual Merit Review Results Report - Cross-reference of Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Investigators, Projects, and Organizations | Department of Energy Cross-reference of Project Investigators, Projects, and Organizations 2014 Annual Merit Review Results Report - Cross-reference of Project Investigators, Projects, and Organizations Merit review of DOE Vehicle Technologies research activities PDF icon 2014_amr_11.pdf More Documents & Publications 2013 Annual Merit Review Results Report - Cross-Reference of Project Investigators, Projects, and Organizations 2012 Annual

  4. 2013 Annual Merit Review Results Report - Cross-Reference of Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Investigators, Projects, and Organizations | Department of Energy Cross-Reference of Project Investigators, Projects, and Organizations 2013 Annual Merit Review Results Report - Cross-Reference of Project Investigators, Projects, and Organizations Merit review of DOE Vehicle Technologies research activities PDF icon 2013_amr_11.pdf More Documents & Publications 2012 Annual Merit Review Results Report - Cross-Reference of Project Investigtors, Projects, and Organizations 2014 Annual Merit

  5. 1?10 kW Stationary Combined Heat and Power Systems Status and Technical Potential: Independent Review

    SciTech Connect (OSTI)

    Maru, H. C.; Singhal, S. C.; Stone, C.; Wheeler, D.

    2010-11-01

    This independent review examines the status and technical potential of 1-10 kW stationary combined heat and power fuel cell systems and analyzes the achievability of the DOE cost, efficiency, and durability targets for 2012, 2015, and 2020.

  6. 1–10 kW Stationary Combined Heat and Power Systems Status and Technical Potential: Independent Review

    Broader source: Energy.gov [DOE]

    This independent review examines the status and technical potential of 1-10 kW stationary combined heat and power fuel cell systems and analyzes the achievability of the DOE cost, efficiency, and durability targets for 2012, 2015, and 2020.

  7. Independent Specific Administrative Controls Review, Office of River Protection- December 2010

    Broader source: Energy.gov [DOE]

    Specific Administrative Controls Review with the Office of Environmental Management at the Office of River Protection

  8. Independent Verification and Validation Of SAPHIRE 8 Software Requirements Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-03-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE requirements definition is to assess the activities that results in the specification, documentation, and review of the requirements that the software product must satisfy, including functionality, performance, design constraints, attributes and external interfaces. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production. IV&V reviewed the requirements specified in the NRC Form 189s to verify these requirements were included in SAPHIREs Software Verification and Validation Plan (SVVP).

  9. Independent Verification and Validation Of SAPHIRE 8 Software Requirements Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2009-09-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE requirements definition is to assess the activities that results in the specification, documentation, and review of the requirements that the software product must satisfy, including functionality, performance, design constraints, attributes and external interfaces. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production. IV&V reviewed the requirements specified in the NRC Form 189s to verify these requirements were included in SAPHIREs Software Verification and Validation Plan (SVVP).

  10. DOE Vehicle Technologies Program 2009 Merit Review Report - PI and Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cross Reference | Department of Energy PI and Project Cross Reference DOE Vehicle Technologies Program 2009 Merit Review Report - PI and Project Cross Reference Merit review of DOE Vehicle Technologies Program research efforts PDF icon 2009_merit_review_12.pdf More Documents & Publications 2008 Annual Merit Review Results Summary - 18. Cross-Reference of Project Investigators, Projects, and Organizations 2010 Annual Merit Review Results Cross Reference of PIs and Organizations DOE

  11. EM Capital and Major Operating Project Standard Review Plan Edition Two |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy EM Capital and Major Operating Project Standard Review Plan Edition Two EM Capital and Major Operating Project Standard Review Plan Edition Two This memorandum introduces the Second Edition of the Capital and Major Operations Projects Standard Review Plan (SRP). PDF icon Memo Issuance of EM Capital and Major Operating Project Standard Review Plan Edition Two More Documents & Publications Standard Review Plan - Overview EM Quality Assurance Assessment Schedule FY 2010

  12. Independent Oversight Review, Hanford K Basin and Cold Vacuum Drying Facility- August 2012

    Broader source: Energy.gov [DOE]

    Review of Hanford K Basin and Cold Vacuum Drying Facility Found Fuel Multi-Canister Overpack Operations

  13. Independent Oversight Targeted Review, Y-12 National Security Complex- February 2012

    Broader source: Energy.gov [DOE]

    Targeted Review of Site Preparedness for Severe Natural Phenomena Events at the Y-12 National Security Complex

  14. Independent Oversight Review, Nevada Site Office and National Security Technologies, LLC- November 2011

    Broader source: Energy.gov [DOE]

    Review of Nevada Site Office and National Security Technologies, LLC, Line Oversight and Contractor Assurance Systems Self-Assessment

  15. 1990 DOE/SANDIA crystalline photovoltaic technology project review meeting

    SciTech Connect (OSTI)

    Ruby, D.S.

    1990-07-01

    This document serves as the proceedings for the annual project review meeting held by Sandia's Photovoltaic Cell Research Division and Photovoltaic Technology Division. It contains information supplied by each organization making a presentation at the meeting, which was held August 7 through 9, 1990 at the Sheraton Hotel in Albuquerque, New Mexico. Sessions were held to discuss national photovoltaic programs, one-sun crystalline silicon cell research, concentrator silicon cell research, concentrator 3-5 cell research, and concentrating collector development.

  16. 2015 Carbon Storage Project Review Meeting | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Carbon Storage R&D Project Review Meeting Meeting Summary Presentations Tuesday, August 18, 2015 OPENING PLENARY SESSION - KEYNOTE PRESENTATION Transforming Technology Through Integration and Collaboration Grace M. Bochenek, Ph.D., Director, U.S. Department of Energy, National Energy Technology Laboratory DOE's Clean Coal RD&D Program Mark Ackiewicz, Office of Fossil Energy, U.S. Department of Energy Overview of the Norwegian RD&D CCS Program (CLIMIT) Hans Jörg Fell, Gassnova IEAGHG

  17. Biochemical Feedstock Interface Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Feedstock Interface BETO 2015 Project Peer Review March 23, 2015 Washington D.C. Nick Nagle Allison Ray Garold Gresham National Renewable Energy Laboratory Idaho National Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information WBS 2.2.1.100, 2.2.1.101, & 2.2.1.102 2 | Bioenergy Technologies Office Goal Statement Goal: * Understand the impact of feedstock logistics & preprocessing on blend conversion performance Relevance to BETO

  18. Quality Procedure - Independent Assessments | Department of Energy

    Energy Savers [EERE]

    Independent Assessments Quality Procedure - Independent Assessments This procedure establishes the process for planning, performing, and reporting Independent Assessments (i.e., assist visits, program/project reviews, direct observations, etc.) as conducted by the Office of Standards and Quality Assurance. Independent assessments are performed at EM Headquarters and Field Offices to determine compliance to requirements and to identify systemic issues, potential risk, emerging issues, and for

  19. Recommendation 174: Quarterly Project Reviews Be Shared with the EM SSABs |

    Office of Environmental Management (EM)

    Department of Energy 74: Quarterly Project Reviews Be Shared with the EM SSABs Recommendation 174: Quarterly Project Reviews Be Shared with the EM SSABs The ORSSAB recommends DOE Quarterly Project Reviews Be Shared with the EM SSABs. PDF icon Recommendation 174 PDF icon DOE response to recommendation 174 More Documents & Publications Recommendation 179: DOE Quarterly Project Reviews Recommendation 173: Recommendation to Support Establishment and Continuation of the Office of

  20. Reviewing Post-Installation and Annual Reports for Federal ESPC Projects |

    Energy Savers [EERE]

    Department of Energy Reviewing Post-Installation and Annual Reports for Federal ESPC Projects Reviewing Post-Installation and Annual Reports for Federal ESPC Projects The purpose of this document is to provide a framework for implementing uniform and consistent reviews of post-installation and annual reports for federal ESPC projects. These procedures will allow for consistent evaluations of performance reports, produce standardized reviews, and enable centralized tracking of ongoing project

  1. The Independent Technical Analysis Process

    SciTech Connect (OSTI)

    Duberstein, Corey A.; Ham, Kenneth D.; Dauble, Dennis D.; Johnson, Gary E.

    2007-04-13

    The Bonneville Power Administration (BPA) contracted with the Pacific Northwest National Laboratory (PNNL) to provide technical analytical support for system-wide fish passage information (BPA Project No. 2006-010-00). The goal of this project was to produce rigorous technical analysis products using independent analysts and anonymous peer reviewers. In the past, regional parties have interacted with a single entity, the Fish Passage Center to access the data, analyses, and coordination related to fish passage. This project provided an independent technical source for non-routine fish passage analyses while allowing routine support functions to be performed by other well-qualified entities.

  2. Distributed Hydrogen Production from Natural Gas: Independent...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Production from Natural Gas: Independent Review Panel Report Distributed Hydrogen Production from Natural Gas: Independent Review Panel Report Independent review report on the ...

  3. FINAL REPORT FOR INDEPENDENT CONFIRMATORY SURVEY SUMMARY AND RESULTS FOR THE HEMATITE DECOMMISSIONING PROJECT, FESTUS, MISSOURI

    SciTech Connect (OSTI)

    Bailey, Erika N.; Lee, Jason D.

    2012-09-21

    ORAU conducted confirmatory surveys of the Hematite site during the period of June 12 through June 13, 2012. The survey activities included in-process inspections, document review, walkover surveys, sampling activities, and laboratory analysis of split samples. WEC was forthcoming with information relating to practices, procedures, and surface scan results. Scans performed by the WEC technician were extremely thorough and methodical. The WEC and ORAU technicians identified the same areas of elevated activity with comparable detector responses. WEC sampling of re-use soils, waste soils, sediments, and groundwater were conducted under ORAU observation. The sampling efforts observed by ORAU were performed in accordance with site-specific procedures and in a manner sufficient to provide quality supporting data. Three observations were made during groundwater sampling activities. First, the water level indicator was re-used without submitting rinse blank. Second, bubbles created during tubing extraction could indicate the presence of volatilized organic compounds. Third, samplers did not use a photo ionization detector prior to sample collection to indicate the presence of volatile organic vapors. Results of split samples indicated a high level of comparability between the WEC and ORAU/ORISE radiological laboratories. Analytical practices and procedures appear to be sufficient in providing quality radiochemical data. All concentrations from the Soil Re-Use Area and sediment samples are below Uniform radionuclide-specific derived concentration guideline level (DCGL{sub W}) limits; thus, comparisons to the less conservative stratified geometry were not required. Results were compared to individual DCGLs and using the sum of fractions approach. Both composite soil samples collected from the Waste Handling Area (Bins 1 and 4) were well below the prescribed USEI waste acceptance criteria.

  4. Rooftop Unit Network Project - 2013 BTO Peer Review | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Network Project - 2013 BTO Peer Review Rooftop Unit Network Project - 2013 BTO Peer Review Emerging Technologies Project for the 2013 Building Technologies Office's Program Peer Review PDF icon emrgtech23_brambley_040413.pdf More Documents & Publications Rooftop Unit Suite: RTU Challenge, RTU Advanced Controls and RTU Smart Monitoring and Diagnostic System - 2013 BTO Peer Review Technical Meeting: Software Framework for Transactive Energy Transactional Network

  5. Appendix J: Peer reviewer project/program evaluation form

    SciTech Connect (OSTI)

    None, None

    2009-01-18

    This is a sample PEER Review Evaluation Form to be completed by reviewers after presentations and before leaving the review site.

  6. 1992 DOE/Sandia crystalline photovoltaic technology project review meeting

    SciTech Connect (OSTI)

    Maish, A.

    1992-07-01

    This document serves as the proceedings for the annual project review meeting held by Sandia National Laboratories` Photovoltaic Technology and Photovoltaic Evaluation Departments. It contains information supplied by organizations making presentations at the meeting, which was held July 14--15, 1992 at the Sheraton Old Town Hotel in Albuquerque, New Mexico. Overview sessions covered the Department of Energy (DOE) program, including those at Sandia and the National Renewable Energy Laboratory (NREL), and non-DOE programs, including the EPRI concentrator collector program, The Japanese crystalline silicon program, and some concentrating photovoltaic activities in Europe. Additional sessions included papers on Sandia`s Photovoltaic Device Fabrication Laboratory`s collaborative research, cell processing research, the activities of the participants in the Concentrator Initiative Program, and photovoltaic technology evaluation at Sandia and NREL.

  7. Enterprise Assessments Targeted Review of Work Planning and Control at the Hanford Central Plateau Environmental Remediation Projects- June 2015

    Broader source: Energy.gov [DOE]

    Targeted Review of Work Planning and Control at the Hanford Central Plateau Environmental Remediation Projects

  8. DOE Hydrogen Delivery Analysis and High Pressure Tanks R&D Project Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Meeting Agenda | Department of Energy Delivery Analysis and High Pressure Tanks R&D Project Review Meeting Agenda DOE Hydrogen Delivery Analysis and High Pressure Tanks R&D Project Review Meeting Agenda DOE Hydrogen Delivery Analysis and High Pressure Tanks R&D Project Review Meeting Agenda, held February 8-9, 2005 by Argonne National Laboratory PDF icon pipeline_agenda.pdf More Documents & Publications Meeting Agenda Joint Meeting on Hydrogen Delivery Modeling and Analysis

  9. FRIB reviewed favorably by DOE Office of Project Assessment (Michigan State

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    University, Facility for Rare Isotope Beams) | Jefferson Lab www.frib.msu.edu/content/frib-reviewed-favorably-doe-office-project-assessment

  10. Director's CD-3b Readiness Review of the MINERvA Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3b Readiness Review of the MINERvA Project Main INjector ExpeRiment v-A June 11, 2007 | Overview | CD-3b Documentation| Other Documents| Link to the Directorate Web Page for this Review Overview of Charge and Experiment MINERvA Overview (pdf) Review Agenda (pdf) Review Charge (pdf) DOE CD-3b Scorecard (pdf with links) Review Presentations by MINERvA Project Team Project Overview (pdf) Scintillators (WBS 1.0) WLS Fibers (WBS 2.0) and Clear Fiber Cables (WBS 4.0) (pdf) Phototubes (WBS 6.0) PMT

  11. Design review plan for Multi-Function Waste Tank Facility (Project W-236A)

    SciTech Connect (OSTI)

    Renfro, G.G.

    1994-12-20

    This plan describes how the Multi-Function Waste Tank Facility (MWTF) Project conducts reviews of design media; describes actions required by Project participants; and provides the methodology to ensure that the design is complete, meets the technical baseline of the Project, is operable and maintainable, and is constructable. Project W-236A is an integrated project wherein the relationship between the operating contractor and architect-engineer is somewhat different than that of a conventional project. Working together, Westinghouse Hanford Company (WHC) and ICF Karser Hanford (ICF KH) have developed a relationship whereby ICF KH performs extensive design reviews and design verification. WHC actively participates in over-the-shoulder reviews during design development, performs a final review of the completed design, and conducts a formal design review of the Safety Class I, ASME boiler and Pressure Vessel Code items in accordance with WHC-CM-6-1, Standard Engineering Practices.

  12. Documentation of Hanford Site independent review of the Hanford Waste Vitrification Plant Preliminary Safety Analysis Report. Revision 3

    SciTech Connect (OSTI)

    Herborn, D.I.

    1993-11-01

    Westinghouse Hanford Company (WHC) is the Integrating Contractor for the Hanford Waste Vitrification Plant (HWVP) Project, and as such is responsible for preparation of the HWVP Preliminary Safety Analysis Report (PSAR). The HWVP PSAR was prepared pursuant to the requirements for safety analyses contained in US Department of Energy (DOE) Orders 4700.1, Project Management System (DOE 1987); 5480.5, Safety of Nuclear Facilities (DOE 1986a); 5481.lB, Safety Analysis and Review System (DOE 1986b) which was superseded by DOE order 5480-23, Nuclear Safety Analysis Reports, for nuclear facilities effective April 30, 1992 (DOE 1992); and 6430.lA, General Design Criteria (DOE 1989). The WHC procedures that, in large part, implement these DOE requirements are contained in WHC-CM-4-46, Nonreactor Facility Safety Analysis Manual. This manual describes the overall WHC safety analysis process in terms of requirements for safety analyses, responsibilities of the various contributing organizations, and required reviews and approvals.

  13. Reviews and Validations | Department of Energy

    Energy Savers [EERE]

    Services » Project Management » Reviews and Validations Reviews and Validations External Independent Review (EIR) Procedures Under DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, the Office of Acquisition and Project Management (OAPM) must perform a Performance Baseline External Independent Review (EIR) prior to Critical Decision (CD) 2, and a Construction/Execution Readiness EIR for all Major System projects prior to CD-3. The EIR Standard Operating

  14. INDEPENDENT COST REVIEW (ICR)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Report SOP Standard Operating Procedure TEC Total Estimated Cost TIPR Technical ... FY13 FY14 FY15 FY16 Total PED Construction TEC OPC TPC Note: above values include MR...

  15. INDEPENDENT COST REVIEW (ICR)

    Office of Environmental Management (EM)

    the entire effort, including report preparation and logistics, on comparatively straightforward ICRs for which no contractor support is required. However, for more complex ICRs...

  16. DOE CD-3b Review of the MINERvA Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3b Review of the MINERvA Project Main INjector ExpeRiment v-A August 21, 2007 | Overview | CD-3b Documentation| Other Documents| Overview of Charge and Experiment MINERvA Overview (pdf) Review Agenda (pdf) Review Charge (pdf) DOE CD-3b Scorecard (pdf with links) Scorecard Addendum describing documents not needed by MINERvA for CD-3b (pdf with links) Review Presentations by MINERvA Project Team (links to appear the week of August 14) Project Overview (pdf) Scintillators (WBS 1.0) WLS Fibers (WBS

  17. Voluntary Protection Program Onsite Review, Idaho Cleanup Project- October 2010

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether Idaho Cleanup Project is continuing to perform at a level deserving DOE-VPP Star recognition.

  18. Advanced Membrane Separations to Improve Efficiency of Thermochemical Conversion Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2015 Project Peer Review Advanced Membrane Separations to Improve Efficiency of Thermochemical Conversion March 24, 2015 Technology Area Review Oak Ridge National Laboratory (ORNL) National Renewable Energy Laboratory (NREL) Project Team: Michael Hu Brian Bischoff Chaiwat Engtrakul Mark Davis High Performance Architectured Surface-Selective (HiPAS) 2 Presentation name Goal Statement This project seeks to develop & employ a new class of HiPAS membranes, to improve the efficiency of bio-oil

  19. Vehicle Technologies Office Merit Review 2014: EV Project: Solar-Assisted

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Charging Demo | Department of Energy EV Project: Solar-Assisted Charging Demo Vehicle Technologies Office Merit Review 2014: EV Project: Solar-Assisted Charging Demo Presentation given by Oak Ridge National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about the EV project: solar-assisted charging demo. PDF icon vss138_lapsa_2014_o.pdf More Documents & Publications CX-002663: Categorical Exclusion

  20. Assessment of Financial Savings From Peer Reviews of In-Progress Projects:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A Case Study from the Department of Energy's Hydrogen Program | Department of Energy Financial Savings From Peer Reviews of In-Progress Projects: A Case Study from the Department of Energy's Hydrogen Program Assessment of Financial Savings From Peer Reviews of In-Progress Projects: A Case Study from the Department of Energy's Hydrogen Program Results of a study to assess the financial savings to the Department of Energy's (DOE) Hydrogen Program due to decisions made from peer reviews. PDF

  1. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report.

    SciTech Connect (OSTI)

    Howerton, Jack; Hwang, Diana

    1984-11-01

    This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.

  2. DOE CD-4 Review of the MINERvA Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assessment Document (with signatures) (pdf) Integrated Safety Management Document (pdf) Burn Test Results (pdf) Project Execution Plan (22207 Version with signatures) (pdf) Other...

  3. Advanced Sensors and Instrumentation 2013 ANNUAL PROJECT REVIEW

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... The Recalibration Methodology research project directly supports the needs of the Light Water Reactor Sustainability, Advanced Small Modular Reactor, Next Generation Nuclear Plant ...

  4. Review of the Sodium Bearing Waste Treatment Project - Integrated...

    Office of Environmental Management (EM)

    Mutual GAC Granulated Activated Carbon HEPA High Efficiency Particulate Air HSS Office of Health, Safety and Security ICP Idaho Cleanup Project INL Idaho National Laboratory...

  5. Energy Design Assistance Project Tracker - 2014 BTO Peer Review...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    By demonstrating how to combine NZE technologies and design approaches into an overall efficiency package that can be implemented at minimal incremental capital cost, this project ...

  6. DOE/SC Lehman Review of US ITER Project, USIPO,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sciences Associate Director Ed Synakowski at the June ITER Council meeting in Aomori, Japan. The focus of this meeting was to review progress and provide direction to ITER...

  7. Independent Activity Report, Richland Operations Office - June 2011 |

    Office of Environmental Management (EM)

    Department of Energy June 2011 Independent Activity Report, Richland Operations Office - June 2011 June 2011 Hanford Sludge Treatment Project Review [HIAR-RL-2011-06-17] This Independent Activity Report documents an operational awareness activity conducted by Office of Health, Safety and Security's Office of Safety and Emergency Management Evaluations June 13-17, 2011, at the Sludge Treatment Project at the Department of Energy's (DOE) Hanford Site. The activity consisted of touring project

  8. Director's CD-1/Trial CD-2 Review of the MINERvA Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1/Trial CD-2 Review of the MINERvA Project Main INjector ExpeRiment v-A December 13-15, 2005 | Overview | General Reference Material | CD-1/CD-2 Documentation| Link to the Directorate Web Page for this review Review Overview Information Charge to the Committee (pdf) Agenda (pdf - linked to talks) List of Prepared Breakout Talks (pdf) Review Committee (pdf) Video and Phone Connection Numbers (doc) Information for Visitors Bringing Laptops to Fermilab (doc) Final Report - Director's Prelimianary

  9. Finance and Markets: Public Peer Review of EPSA Projects | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Finance and Markets: Public Peer Review of EPSA Projects Finance and Markets: Public Peer Review of EPSA Projects November 10, 2015 - 12:30pm Addthis Hugh Chen Hugh Chen Deputy Director for Finance, Incentives, and Program Analysis On Wednesday, December 9, 2015, the Office of Energy Policy and Systems Analysis (EPSA) at the U.S. Department of Energy will be conducting an in-progress public peer review for energy-related financial and market analytical projects. All interested

  10. Kaiser Engineers Hanford internal position paper -- Project W-236A, Multi-function Waste Tank Facility -- Peer reviews of selected activities

    SciTech Connect (OSTI)

    Stine, M.D.

    1995-01-04

    The purpose of this paper is to develop and document a proposed position on the performance of independent peer reviews on selected design and analysis components of the Title 1 [Preliminary] and Title 2 [Final] design phases of the Multi-Function Waste Tank Facility [MWTF] project. An independent, third-party peer review is defined as a documented critical review of documents, data, designs, design inputs, tests, calculations, or related materials. The peer review should be conducted by persons independent of those who performed the work, but who are technically qualified to perform the original work. The peer review is used to assess the validity of assumptions and functional requirements, to assess the appropriateness and logic of selected methodologies and design inputs, and to verify calculations, analyses and computer software. The peer review can be conducted at the end of the design activity, at specific stages of the design process, or continuously and concurrently with the design activity. This latter method is often referred to as ``Continuous Peer Review.``

  11. The Independent Technical Analysis Process Final Report 2006-2007.

    SciTech Connect (OSTI)

    Duberstein, Corey; Ham, Kenneth; Dauble, Dennis; Johnson, Gary

    2007-03-01

    The Bonneville Power Administration (BPA) contracted with the Pacific Northwest National Laboratory (PNNL) to provide technical analytical support for system-wide fish passage information (BPA Project No. 2006-010-00). The goal of this project was to produce rigorous technical analysis products using independent analysts and anonymous peer reviewers. This project provided an independent technical source for non-routine fish passage analyses while allowing routine support functions to be performed by other well-qualified entities. The Independent Technical Analysis Process (ITAP) was created to provide non-routine analysis for fish and wildlife agencies and tribes in particular and the public in general on matters related to juvenile and adult salmon and steelhead passage through the mainstem hydrosystem. The process was designed to maintain the independence of analysts and reviewers from parties requesting analyses, to avoid potential bias in technical products. The objectives identified for this project were to administer a rigorous, transparent process to deliver unbiased technical assistance necessary to coordinate recommendations for storage reservoir and river operations that avoid potential conflicts between anadromous and resident fish. Seven work elements, designated by numbered categories in the Pisces project tracking system, were created to define and accomplish project goals as follows: (1) 118 Coordination - Coordinate technical analysis and review process: (a) Retain expertise for analyst/reviewer roles. (b) Draft research directives. (c) Send directive to the analyst. (d) Coordinate two independent reviews of the draft report. (e) Ensure reviewer comments are addressed within the final report. (2) 162 Analyze/Interpret Data - Implement the independent aspects of the project. (3) 122 Provide Technical Review - Implement the review process for the analysts. (4) 132 Produce Annual Report - FY06 annual progress report with Pisces Disseminate (5) 161 Disseminate Raw/Summary Data and Results - Post technical products on the ITAP web site. (6) 185-Produce Pisces Status Report - Provide periodic status reports to BPA. (7) 119 Manage and Administer Projects - project/contract administration.

  12. 2008 Annual Merit Review Results Summary - 18. Cross-Reference of Project Investigators, Projects, and Organizations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8-1 18. Cross-Reference of Project Investigators, Projects, and Organizations Cross-Reference, Sorted by Project Investigator Page Principal Investigator (Organization) - Project Title / Session 2-12 Abraham, Daniel (Argonne National Laboratory) -- ANL Diagnostics / Applied Battery Research 2-70 Abraham, Daniel (Argonne National Laboratory) -- SEI Studies at ANL / Applied Battery Research 7-24 Aceves, Salvador (Lawrence Livermore National Laboratory) -- HCCI Engine Research and Modeling /

  13. 2013 Annual Merit Review Results Report - Cross-Reference of Project Investigators, Projects, and Organizations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 11. Cross-Reference of Project Investigators, Projects, and Organizations Cross Reference, Sorted by Project Investigator Page Number Principal Investigator, Organization. Project Title (Session) 9-15 Aaron Brooker; National Renewable Energy Laboratory. Analytical Modeling Linking the FASTSim and ADOPT Software Tools (Vehicle Analysis) 1-13 Abdullah Bazzi; Chrysler LLC. Advancing Transportation Through Vehicle Electrification - PHEV (Vehicle & System Simulation) 2-80 Ahmad Pesaran;

  14. Independent Oversight Review of Management of Safety Systems at the Oak Ridge Transuranic Waste Processing Center and Associated Feedback and Improvement Processes, September 2013

    Office of Environmental Management (EM)

    Independent Oversight Review of Management of Safety Systems at the Oak Ridge Transuranic Waste Processing Center and Associated Feedback and Improvement Processes May 2011 February 2013 September 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U. S. Department of Energy Table of Contents 1.0

  15. DOE Hydrogen Delivery High-Pressure Tanks and Analysis Project Review Meeting

    Broader source: Energy.gov [DOE]

    On February 8-9, 2005, the Department of Energy held the DOE Hydrogen Delivery High-Pressure Tanks and Analysis Project Review Meeting at Argonne National Laboratory. The purpose of the meeting was...

  16. Vehicle Technologies Office Merit Review 2014: EV Project Data & Analytic Results

    Broader source: Energy.gov [DOE]

    Presentation given by Idaho National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about EV project data ...

  17. The Hanford Site-Wide Risk Review Project | Department of Energy

    Office of Environmental Management (EM)

    December 11, 2014 To view all the P&RA CoP 2014 Technical Exchange Meeting videos click here. Video Presentation PDF icon The Hanford Site-Wide Risk Review Project More...

  18. Vehicle Technologies Office Merit Review 2015: PEV-EVSE Interoperability Project

    Broader source: Energy.gov [DOE]

    Presentation given by Intertek at 2015 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation meeting about PEV-EVSE interoperability project.

  19. Reviews and Validations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reviews and Validations Reviews and Validations External Independent Review (EIR) Procedures Under DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, the Office of Acquisition and Project Management (OAPM) must perform a Performance Baseline External Independent Review (EIR) prior to Critical Decision (CD) 2, and a Construction/Execution Readiness EIR for all Major System projects prior to CD-3. The EIR Standard Operating Procedures (SOP) discuss all elements of

  20. FINAL Letter v1, 1/12/15, CRESP Site-Wide Risk Review Project 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Letter v1, 1/12/15, CRESP Site-Wide Risk Review Project 1 Author: Pam Larsen The Honorable Monica Regalbuto Assistant Secretary for Environmental Management Subject: Discontinue funding for CRESP studies from Hanford cleanup dollars Dear Assistant Secretary Regalbuto: The Hanford Advisory Board (HAB) is writing with respect to the draft Hanford Site-Wide Risk Review Project's Interim Progress Report (August 31, 2015), prepared by the Consortium for Risk Evaluation with Stakeholder Participation

  1. NREL Thermochemical Platform Analysis Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (BETO) 2015 Project Peer Review: NREL Thermochemical Platform Analysis Presenter: Abhijit Dutta on behalf of Mary Biddy, Jack Ferrell and Michael Talmadge (PI) BETO 2015 Project Peer Review Hilton Mark Center, Alexandria, VA March 26, 2015 2 1. Goal and Supporting Objectives Goal Statement: Develop process and techno-economic models for biomass-to-fuels research. * Develop design cases / reports to identify barriers and set technical and cost targets for cost competitiveness by 2022 * Use

  2. Catalytic Upgrading of Sugars Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4th, 2015 Technology Area Review: Biochemical Conversion Principal Investigator: David K. Johnson Organization: National Renewable Energy Laboratory DOE Bioenergy Technologies Office 2015 Project Peer Review Catalytic Upgrading of Sugars This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 Goal Statement Direct support for BETO's Multi-Year Program Plan (MYPP) objectives: * This project directly supports BETO's MYPP objectives to demonstrate

  3. Template for Expedited National Environmental Policy Act (NEPA) Review of Certain State Energy Program Projects

    Energy Savers [EERE]

    Enclosure 2 Template for Expedited NEPA Review of Certain State Energy Program Projects Purpose: This document provides an optional approach/Template that a State may use to help the Department of Energy (DOE) expedite National Environmental Policy Act (NEPA) review of certain activities (Projects) contained in the State's energy and conservation plan for which the State requests State Energy Program (SEP) funding. This optional approach/Template builds on the August 21, 2009, draft guidance

  4. Assessment of Financial Savings from Peer Reviews of In-Progress Projects:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A Case Study from the Department of Energy's Hydrogen Program | Department of Energy Assessment of Financial Savings from Peer Reviews of In-Progress Projects: A Case Study from the Department of Energy's Hydrogen Program Assessment of Financial Savings from Peer Reviews of In-Progress Projects: A Case Study from the Department of Energy's Hydrogen Program Results of a study to assess the financial savings to the Department of Energy's (DOE) Hydrogen Program due to decisions made from peer

  5. Independent Verification and Validation Of SAPHIRE 8 Software Design and Interface Design Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-03-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE software design and interface design is to assess the activities that results in the development, documentation, and review of a software design that meets the requirements defined in the software requirements documentation. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production. IV&V reviewed the requirements specified in the NRC Form 189s to verify these requirements were included in SAPHIREs Software Verification and Validation Plan (SVVP) design specification.

  6. Independent Verification and Validation Of SAPHIRE 8 Software Design and Interface Design Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2009-10-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE software design and interface design is to assess the activities that results in the development, documentation, and review of a software design that meets the requirements defined in the software requirements documentation. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production. IV&V reviewed the requirements specified in the NRC Form 189s to verify these requirements were included in SAPHIREs Software Verification and Validation Plan (SVVP) design specification.

  7. Solar Technology Assessment Project. Volume VII. A review of OTEC

    SciTech Connect (OSTI)

    Yuen, P.C.

    1981-04-01

    The Ocean Thermal Energy Conversion (OTEC) principle is discussed along with general system and cycle types, specific OTEC designs, applications, and the ocean thermal resource. the historic development and present status of OTEC are reviewed. Power system components of the more technically advanced closed-cycle OTEC concept are discussed: heat exchangers, corrosion and biofouling countermeasures, working fluids, ammonia power systems, and on-platform seawater sytems. Several open-cycle features are also discussed. A critical review of the ocean engineering aspects of the OTEC power system is presented. Major subsystems such as platform, cold water pipe, mooring system, dynamic positioning system and power transmission cable system are assessed for their relationships with the ocean environment and with each other. Nine available studies of OTEC costs are reviewed, and tentative comparisons are made between OTEC and traditional fuel costs. OTEC products and markets are considered. Possible environmental and social effects of OTEC development are discussed. International and national laws regulating OTEC plants are reviewed, specifically, the United Nations Third Conference on the Law of the Sea and the Ocean Thermal Energy Conversion Act of 1980. Coast Guard regulations, OSHA laws, and state and local government regulations are also considered as well as attitudes of the utilities. (LEW)

  8. Biochemical Platform Analysis Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Biochemical Platform Analysis Biochemical Platform Review March 23, 2015 Alexandria, VA Ryan Davis National Renewable Energy Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information NATIONAL RENEWABLE ENERGY LABORATORY Goal Statement Biochemical Platform Analysis Objective: *Provide process design and economic analysis support for the biochemical conversion platform, to guide R&D priorities for both NREL and BETO * Translate

  9. A Hybrid Catalytic Route to Fuels from Biomass Syngas Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    LanzaTech. All rights reserved. 1 A Hybrid Catalytic Route to Fuels from Biomass Syngas BETO's Project Peer Review, March 2015 Alexandria, VA Alice Havill Senior Process Engineer Project Principle Investigator Hybrid Catalytic Route to Fuels from Biomass Syngas Project Objective: develop a hybrid conversion technology for catalytic upgrading of biomass- derived syngas to jet fuel and chemicals while ensure the cost, quality and environmental requirements of the aviation industry are met System

  10. A Review of the NGNP Project: February 2006 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the NGNP Project: February 2006 A Review of the NGNP Project: February 2006 In 2002, the Department of Energy Office of Nuclear Energy completed a technology roadmap project that provided an overall plan to the broad vision of enhancing the future role of nuclear energy systems in the United States and the world at large. This Technology Roadmap focused on the development of advanced nuclear systems, so-called Generation IV systems, which meet profram foals of improved safety and economics, as

  11. Memo Issuance of EM Capital and Major Operating Project Standard Review Plan Edition Two

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MAR 2 4 201011 MEMORANDUM FOR DISTRIBUTION FROM: DR. STEVEN L. KRAHN DEPUTY ASSISTANT SAFETY AND SECU EIVVIROIVMENTAL MANAGEMENT SUBJECT: Issuance of Environmental Management Capital and Major Operating Project Standard Review Plan Edition Two The Office of Environmental Management (EM) is responsible for managing the design, construction, operation, and eventual disposition of mission critical projects/facilities. Effective management of these projects requires multiple disciplines to be

  12. C:\\Work 102004\\2006 Projections\\NV Projections Review 2008 v45...

    National Nuclear Security Administration (NNSA)

    ... Solar projects in Clark County. The biggest gain will come ... Changing energy markets may increase the pace of ... oil is available in Nevada for production at higher prices. ...

  13. Independent Verification and Validation Of SAPHIRE 8 System Test Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-02-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE System Test Plan is to assess the approach to be taken for intended testing activities associated with the SAPHIRE software product. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

  14. Independent Oversight Review, Richland Operations Office and CH2M Hill Plateau Remediation Company and Mission Support Alliance- April 2012

    Broader source: Energy.gov [DOE]

    Review of Richland Operations Office and CH2M Hill Plateau Remediation Company and Mission Support Alliance Conduct of Operations

  15. DOE CD-1/2/3a Review of the MINERvA Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1/2/3a Review of the MINERvA Project Main INjector ExpeRiment v-A December 5, 2006 | Overview | CD-2 Documentation| CD-3a Documentation|Other Documents| Overview of Charge and Experiment MINERvA Overview (pdf) DOE CD-2 and CD-3a Scorecard (pdf) Review Presentations by MINERvA Project Team Project Overview (pdf) Scintillators (WBS 1.0) WLS Fibers (WBS 2.0) and Clear Fiber Cables (WBS 4.0) (pdf) Phototubes (WBS 6.0) PMT Housing (WBS 5.0) and Electronics and DAQ (WBS 7.0) (pdf) Scintillator Plane

  16. Summary for the Next Generation Nuclear Plant Project in Review

    SciTech Connect (OSTI)

    L.E. Demick

    2010-08-01

    This paper reports on the major progress that the NGNP Project has made toward developing and commercializing the HTGR technology. Significant R&D progress has been made in addressing key technical issues for qualification of the HTGR fuel and graphite, codification of high temperature materials and verification and validation of design codes. Work is also progressing in heat transfer/transport design and testing and in development of the high temperature steam electrolysis hydrogen production process. A viable licensing strategy has been formulated in coordination with the NRC and DOE. White papers covering key licensing issues have been and will continue to be submitted and necessary discussions of these key issues have begun with the NRC. Continued government support is needed to complete the Project objectives as established in the 2005 Energy Policy Act.

  17. Summary for the Next Generation Nuclear Plant Project in Review

    SciTech Connect (OSTI)

    L.E. Demick

    2010-09-01

    This paper reports on the major progress that the NGNP Project has made toward developing and commercializing the HTGR technology. Significant R&D progress has been made in addressing key technical issues for qualification of the HTGR fuel and graphite, codification of high temperature materials and verification and validation of design codes. Work is also progressing in heat transfer/transport design and testing and in development of the high temperature steam electrolysis hydrogen production process. A viable licensing strategy has been formulated in coordination with the NRC and DOE. White papers covering key licensing issues have been and will continue to be submitted and necessary discussions of these key issues have begun with the NRC. Continued government support is needed to complete the Project objectives as established in the 2005 Energy Policy Act.

  18. Protocol_for_Environmental_Management_Cleanup_Projects_(clean).pdf |

    Energy Savers [EERE]

    Department of Energy Protocol_for_Environmental_Management_Cleanup_Projects_(clean).pdf Protocol_for_Environmental_Management_Cleanup_Projects_(clean).pdf PDF icon Protocol_for_Environmental_Management_Cleanup_Projects_(clean).pdf More Documents & Publications External Independent Review (EIR) Standard Operating Procedure (SOP) October 2008 DOE EIR FM.doc External Independent Review (EIR) Standard Operating Procedure (SOP) September 2010

  19. Fungal Genomics Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3.2.103 Fungal Genomics March 25, 2015 Biochemical Technology Area Review Jon Magnuson PNNL This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal Statement Position: Biotechnology will continue to be a key component of the US energy future and fungi are the key players in this industry. Goal: We are focused on developing efficient and robust biocatalysts & bioprocesses and advanced tools to accelerate development. 2 Genetic Engineering

  20. Lessons from Iowa : development of a 270 megawatt compressed air energy storage project in midwest Independent System Operator : a study for the DOE Energy Storage Systems Program.

    SciTech Connect (OSTI)

    Holst, Kent; Huff, Georgianne; Schulte, Robert H.; Critelli, Nicholas

    2012-01-01

    The Iowa Stored Energy Park was an innovative, 270 Megawatt, $400 million compressed air energy storage (CAES) project proposed for in-service near Des Moines, Iowa, in 2015. After eight years in development the project was terminated because of site geological limitations. However, much was learned in the development process regarding what it takes to do a utility-scale, bulk energy storage facility and coordinate it with regional renewable wind energy resources in an Independent System Operator (ISO) marketplace. Lessons include the costs and long-term economics of a CAES facility compared to conventional natural gas-fired generation alternatives; market, legislative, and contract issues related to enabling energy storage in an ISO market; the importance of due diligence in project management; and community relations and marketing for siting of large energy projects. Although many of the lessons relate to CAES applications in particular, most of the lessons learned are independent of site location or geology, or even the particular energy storage technology involved.

  1. ORISE: Independent verification

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Independent verification ORISE techinician performs environmental scanning The Oak Ridge Institute for Science and Education (ORISE) performs independent environmental assessments and verification to determine the effectiveness of radiological cleanup at decontamination and decommissioning (D&D) projects across the United States. Since 1980, ORISE has performed independent verification at more than 500 sites in 42 states and the District of Columbia. As the primary independent verification

  2. Pilot Scale Integration Project Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pilot Scale Integration Project March 25, 2015 Biochemical Conversion Area Daniel Schell NREL This presentation does not contain any proprietary, confidential or otherwise restricted information 2 High-Level Project Goal Support BETO's and the Biochemical Conversion Technology Area's mission to deploy cost-effective biofuels production technology. * Maintains pilot scale facility that is available for BETO and industry use * Generates process-relevant integrated performance data * Facilitates

  3. Independent Oversight Review of Department of Energy Contractor Occupational Medicine Programs from June 1998 to December 1999

    Office of Environmental Management (EM)

    Summary The Department of Energy (DOE) Office of Oversight performed a two-phased review of eight Departmental contractor occupational medicine programs. The first phase of the review was completed in September 1998 and the second phase in December 1999. To conduct the review, Oversight teamed with the Accreditation Association for Ambulatory Health Care (AAAHC), a non-profit accreditation organization for health-care facilities. The Office of Oversight's interim report on the three sites

  4. Completed Projects | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Completed Projects Project Assessment (OPA) OPA Home About Project Management SC Projects Review Dates (updated March 2016) Project Construction Photos Completed Projects Current Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: Email Us Project Construction Photos Completed Projects Print Text

  5. Ongoing Projects | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Current Projects Project Assessment (OPA) OPA Home About Project Management SC Projects Review Dates (updated March 2016) Project Construction Photos Completed Projects Current Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: Email Us Project Construction Photos Current Projects Print Text Size:

  6. Director's CD-2/CD-3a Review of the MINERnA Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Director's CD-2/CD-3a Review of the MINERnA Project Main INjector ExpeRiment v-A August 1-3, 2006 | Overview | General Reference Material | CD-2/3a Documentation| Link to the Directorate Web Page for this review Review Overview Information Charge to the Committee (pdf) Agenda (pdf - with links to all of the plenary and breakout sessions) List of Prepared Breakout Talks (pdf) Review Committee (pdf) Video and Phone Connection Numbers Information for Visitors Bringing Laptops to Fermilab (doc)

  7. U.S. DEPARTMENT OF ENERGYCONTRACT AND PROJECT MANAGEMENT | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy U.S. DEPARTMENT OF ENERGYCONTRACT AND PROJECT MANAGEMENT U.S. DEPARTMENT OF ENERGYCONTRACT AND PROJECT MANAGEMENT U.S. DEPARTMENT OF ENERGY CONTRACT AND PROJECT MANAGEMENT PDF icon U.S. DEPARTMENT OF ENERGYCONTRACT AND PROJECT MANAGEMENT More Documents & Publications External Independent Review (EIR) Standard Operating Procedure (SOP) September 2010 External Independent Review (EIR) Standard Operating Procedure (SOP) Septemebr 2010 External Independent Review (EIR) Standard

  8. Breckinridge Project, initial effort. Report XI, Volume V. Critical review of the design basis. [Critical review

    SciTech Connect (OSTI)

    1982-01-01

    Report XI, Technical Audit, is a compendium of research material used during the Initial Effort in making engineering comparisons and decisions. Volumes 4 and 5 of Report XI present those studies which provide a Critical Review of the Design Basis. The Critical Review Report, prepared by Intercontinental Econergy Associates, Inc., summarizes findings from an extensive review of the data base for the H-Coal process design. Volume 4 presents this review and assessment, and includes supporting material; specifically, Design Data Tabulation (Appendix A), Process Flow Sheets (Appendix B), and References (Appendix C). Volume 5 is a continuation of the references of Appendix C. Studies of a proprietary nature are noted and referenced, but are not included in these volumes. They are included in the Limited Access versions of these reports and may be reviewed by properly cleared personnel in the offices of Ashland Synthetic Fuels, Inc.

  9. Independent Verification and Validation Of SAPHIRE 8 Risk Management Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2009-11-01

    This report provides an evaluation of the risk management. Risk management is intended to ensure a methodology for conducting risk management planning, identification, analysis, responses, and monitoring and control activities associated with the SAPHIRE project work, and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  10. Independent Oversight Assessment, Y-12 National Security Complex - June

    Office of Environmental Management (EM)

    2012 | Department of Energy Y-12 National Security Complex - June 2012 Independent Oversight Assessment, Y-12 National Security Complex - June 2012 June 2012 Assessment of Nuclear Safety Culture at the Y-12 National Security Complex Uranium Processing Facility Project This report provides the results of an independent assessment of nuclear safety culture at the Department of Energy's Uranium Processing Facility Project at the Y-12 National Security Complex. The review was performed by the

  11. Independent Oversight Review of the Los Alamos National Laboratory Transuranic Waste Facility Safety Basis and Design Development, July 2014

    Office of Environmental Management (EM)

    Los Alamos National Laboratory Transuranic Waste Facility Safety Basis and Design Development July 2014 Office of Nuclear Safety and Environmental Assessments Office of Environment, Safety and Health Assessments Office of Independent Enterprise Assessments U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................ 1 2.0 Scope ...

  12. Advanced Enzyme Deconstruction/ Enzyme Engineering & Optimization Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Enzyme Deconstruction/ Enzyme Engineering & Optimization Date: March 23-27 Technology Area Review: Biochemical Platform Principal Investigator: Michael E. Himmel Task Leader: Steve Decker Organization: NREL This presentation does not contain any proprietary, confidential, or otherwise restricted information *On many slides, the slide notes section has important additional information* Goal Statement * Present the goal of this project and describe how the project fits with the

  13. Materials Degradation In Biomass-Derived Oils Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technologies Office (BETO) Project Peer Review Materials Degradation In Biomass-Derived Oils March 25, 2015 Jim Keiser, Mike Brady, Sam Lewis, Maggie Connatser and Mike Kass Oak Ridge National Laboratory Goals/Objectives The presence of significant concentrations of oxygen-bearing compounds, particularly carboxylic acids and ketones, makes biomass derived oils very corrosive to some common structural materials The goals of this project are: 1) Use conventional and developmental analysis

  14. Catalytic Upgrading of Pyrolysis Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office (BETO) 2015 Project Peer Review Catalytic Upgrading of Pyrolysis Products March 24 th , 2015 Thermochemical Conversion Josh Schaidle NREL This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 2.3.1.314 Goal Statement The goal of this project is to design and develop scalable and cost-effective next generation catalysts for ex-situ catalytic fast pyrolysis (CFP) to improve the fuel quality and stability of the resulting bio-oil by reducing

  15. Integration & Scale-Up Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bio-oil Technology Area Review Esther Wilcox March 23 rd , 2015 2015 DOE Bioenergy Technologies Office (BETO) Project Peer Review This presentation does not contain any proprietary, confidential, or otherwise restricted information Integration & Scale-Up WBS 2.4.1.301 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. 2 Goal Statement Integrate and scale-up pyrolysis

  16. Renewable Hydrogen Production from Biomass Pyrolysis Aqueous Phase Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7, 2015 Thermochem Conversion Review PI: Abhijeet P. Borole, Ph.D. Oak Ridge National Laboratory Co:PI's & Collaborators: S. Pavlostathis, C. Tsouris, S. Yiacoumi, Georgia Tech; P. Ye, N. Labbe, University of Tennessee, Knoxville, R. Bhave, ORNL DOE Bioenergy Technologies Office (BETO) 2015 Project Peer Review Renewable Hydrogen Production from Biomass Pyrolysis Aqueous Phase 2 Managed by UT-Battelle for the U.S. Department of Energy Presentation_name Goal Statement * Carbon, Hydrogen and

  17. Reviewing Post-Installation and Annual Reports for Federal ESPC Projects

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reviewing Post-Installation and Annual Reports For Federal ESPC Projects February 2007 Federal Energy Management Program (FEMP) Office of Energy Efficiency and Renewable Energy U.S. Department of Energy This document was developed for the U.S. Department of Energy's Federal Energy Management Program by Nexant, Inc., and Lawrence Berkeley National Laboratory. This document is posted on FEMP's Web site at www.eere.energy.gov/femp/financing/superespcs_mvresources.html. Contents Reviewing

  18. Fractionation and Catalytic Upgrading of Bio-Oil Presentation BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office (BETO) 2015 Project Peer Review Fractionation and Catalytic Upgrading of Bio-Oil FY13 DE-FOA-000 CHASE March 2015 Technology Area Review PI: Daniel E. Resasco - co-PI: Steven P. Crossley University of Oklahoma This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal Statement * Current technologies: - low C-retention in fuel range - high H consumption. * Experimental results allow - life-cycle analysis (LCA) and - techno-economic analysis

  19. Bio-oil Upgrading with Novel Low Cost Catalysts Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    is managed by UT-Battelle for the US Department of Energy DOE Bioenergy Technologies Office (BETO) 2015 Project Peer Review Bio-oil Upgrading with Novel Low Cost Catalysts March 24, 2015 Bio-oil Technology Area Review Jae-Soon Choi Oak Ridge National Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 Goal Statement * Develop novel catalysts effective for bio-oil intermediate upgrading that are less expensive and more durable than

  20. Biological Upgrading of Sugars Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Upgrading of Sugars WBS 2.3.2.105 2015 DOE BioEnergy Technologies Office (BETO) Project Peer Review Date: March 25 th , 2015 Technology Area Review: Biochemical Conversion Principal Investigator: Gregg T. Beckham Organization: National Renewable Energy Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 Goal Statement Goal: develop strains to produce fuels and co-products for the 2017 and 2022 Biochemical Conversion Platform cost

  1. Catalytic Upgrading of Thermochemical Intermediates to Hydrocarbons Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    International RTI International RTI International is a trade name of Research Triangle Institute. www.rti.org 2015 DOE Bioenergy Technologies Office (BETO) Project Peer Review WBS 2.5.4.405 - Catalytic Upgrading of Thermochemical Intermediates to Hydrocarbons March 24, 2015 Bio-Oil Technology Area Review David C. Dayton, PI RTI International This presentation does not contain any proprietary, confidential, or otherwise restricted information RTI International Goals and Objectives Objective:

  2. West Valley Demonstration Project Transportation Emergency Management Program

    Office of Environmental Management (EM)

    West Valley Demonstration Project Transportation Emergency Management Program Independent Oversight Review of the Office of Independent Oversight and Performance Assurance September 2000 OVERSIGHT Table of Contents EXECUTIVE SUMMARY ................................................................... 1 1.0 INTRODUCTION ........................................................................... 4 2.0 RESULTS .........................................................................................

  3. Columbia Basin Fish and Wildlife Authority Project Abstracts; May 25-27, Portland, Oregon, 1997 Annual Review.

    SciTech Connect (OSTI)

    Allee, Brian J.

    1997-06-26

    Abstracts are presented from the 1997 Columbia Basin Fish and Wildlife Program Review of Projects. The purpose was to provide information and education on the approximate 127 million dollars in Northwest electric ratepayer fish and wildlife mitigation projects funded annually.

  4. Operational Awareness Review of the Hanford Sludge Treatment Project, April 2011

    Office of Environmental Management (EM)

    HSS Independent Activity Report - Rev. 0 Report Number: HIAR-RL-2011-04-07 Site: DOE-Richland Operations Office Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Sludge Treatment Project Dates of Activity : 11/17/2010 - 04/07/2011 Report Preparer: Jake Wechselberger Activity Description/Purpose: The U.S. Department of Energy's Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS),

  5. Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Unit Federal Operational Readiness Review

    Office of Environmental Management (EM)

    Federal Operational Readiness Review June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background

  6. Independent Oversight Activity Report, Hanford Sludge Treatment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sludge Treatment Project - September 2013 Independent Oversight Activity Report, Hanford Sludge Treatment Project - September 2013 November 2013 Hanford Sludge Treatment Project...

  7. Phase 5 storage (Project W-112) Central Waste Complex operational readiness review, final report

    SciTech Connect (OSTI)

    Wight, R.H.

    1997-05-30

    This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included.

  8. Review of the Hanford Site Waste Treatment and Immobilization Plant Project Construction Quality, March 2012

    Broader source: Energy.gov (indexed) [DOE]

    Review of the Hanford Site Waste Treatment and Immobilization Plant Project Construction Quality May 2011 March 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Background

  9. Independent Oversight Review of the Savannah River Site Salt Waste Processing Facility Construction Quality and Fire Protection Systems, April 2014

    Office of Environmental Management (EM)

    Review of the Savannah River Site Salt Waste Processing Facility Construction Quality and Fire Protection Systems April 2014 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................ 1 2.0 Background...

  10. INDEPENDENT TECHNICAL ASSESSMENT OF MANAGEMENT OF STORMWATER AND WASTEWATER AT THE SEPARATIONS PROCESS RESEARCH UNIT (SPRU) DISPOSITION PROJECT, NEW YORK

    SciTech Connect (OSTI)

    Abitz, R.; Jackson, D.; Eddy-Dilek, C.

    2011-06-27

    The U.S. Department of Energy (DOE) is currently evaluating the water management procedures at the Separations Process Research Unit (SPRU). The facility has three issues related to water management that require technical assistance: (1) due to a excessive rainfall event in October, 2010, contaminated water collected in basements of G2 and H2 buildings. As a result of this event, the contractor has had to collect and dispose of water offsite; (2) The failure of a sump pump at a KAPL outfall resulted in a Notice of Violation issued by the New York State Department of Environment and Conservation (NYSDEC) and subsequent Consent Order. On-site water now requires treatment and off-site disposition; and (3) stormwater infiltration has resulted in Strontium-90 levels discharged to the storm drains that exceed NR standards. The contractor has indicated that water management at SPRU requires major staff resources (at least 50 persons). The purpose of this review is to determine if the contractor's technical approach warrants the large number of staff resources and to ensure that the technical approach is compliant and in accordance with federal, state and NR requirements.

  11. Justice Department review of federal coal and oil leasing: serving the consistent goals of competition and energy independence

    SciTech Connect (OSTI)

    Kaplan, D.A.

    1981-01-01

    As the nation moves into the 1980s, development of our domestic energy resources must surely be the number one priority of energy policy. Important natural resources are owned by the Federal government and must be dedicated to development in the public interest. This includes a government leasing program which fosters competitive and efficient development of these resources by private companies. Through its antitrust review of individual leases and its general advocacy of competition in the leasing program, the Department of Justice seeks to bring the prospect of a sound national energy policy closer to reality. Examples of how this review functions are drawn from the Outer Continental Shelf Land Acts Amendments of 1978 and the Federal Coal Leasing Amendments Act of 1975. 32 references.

  12. Department of Energy review of the National Spallation Neutron Source Project

    SciTech Connect (OSTI)

    1997-06-01

    A Department of Energy (DOE) review of the Conceptual Design Report (CDR) for the National Spallation Neutron Source (NSNS) was conducted. The NSNS will be a new high-power spallation neutron source; initially, it will operate at 1 megawatt (MW), but is designed to be upgradeable to significantly higher power, at lower cost, when accelerator and target technologies are developed for higher power. The 53-member Review Committee examined the projected cost, schedule, technical scope, and management structure described in the CDR. For each of the major components of the NSNS, the Committee determined that the project team had produced credible designs that can be expected to work well. What remains to be done is to integrate the design of these components. With the exception of the liquid mercury target, the NSNS Project will rely heavily on proven technologies and, thus, will face a relatively low risk to successful project completion. The Total Project Cost (TPC) presented to the Committee in the CDR was $1.266 billion in as-spent dollars. In general, the Committee felt that the laboratory consortium had presented a credible estimate for each of the major components but that value engineering might produce some savings. The construction schedule presented to the Committee covered six years beginning in FY 1999. The Committee questioned whether all parts of the project could be completed according to this schedule. In particular, the linac and the conventional facilities appeared to have overly optimistic schedules. The NSNS project team was encouraged to reexamine these activities and to consider a more conservative seven-year schedule. Another concern of the Committee was the management structure. In summary, the Committee felt that this Conceptual Design Report was a very credible proposal, and that there is a high probability for successful completion of this major project within the proposed budget, although the six-year proposed schedule may be optimistic.

  13. Project Cost Profile Spreadsheet | Department of Energy

    Energy Savers [EERE]

    Project Cost Profile Spreadsheet Project Cost Profile Spreadsheet Under DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, the Office of Acquisition and Project Management (OAPM) must perform a Performance Baseline External Independent Review (EIR) prior to Critical Decision (CD) 2, and a Construction/Execution Readiness EIR for all Major System projects prior to CD-3. The EIR Standard Operating Procedures (SOP) discuss all elements of EIRs including review

  14. The consequences of disposal of low-level radioactive waste from the Fernald Environmental Management Project: Report of the DOE/Nevada Independent Panel

    SciTech Connect (OSTI)

    Crowe, B.; Hansen, W.; Waters, R.; Sully, M.; Levitt, D.

    1998-04-01

    The Department of Energy (DOE) convened a panel of independent scientists to assess the performance impact of shallow burial of low-level radioactive waste from the Fernald Environmental Management Project, in light of a transportation incident in December 1997 involving this waste stream. The Fernald waste has been transported to the Nevada Test Site and disposed in the Area 5 Radioactive Waste Management Site (RWMS) since 1993. A separate DOE investigation of the incident established that the waste has been buried in stress-fractured metal boxes, and some of the waste contained excess moisture (high-volumetric water contents). The Independent Panel was charged with determining whether disposition of this waste in the Area 5 RWMS has impacted the conclusions of a previously completed performance assessment in which the site was judged to meet required performance objectives. To assess the performance impact on Area 5, the panel members developed a series of questions. The three areas addressed in these questions were (1) reduced container integrity, (2) the impact of reduced container integrity on subsidence of waste in the disposal pits and (3) excess moisture in the waste. The panel has concluded that there is no performance impact from reduced container integrity--no performance is allocated to the container in the conservative assumptions used in performance assessment. Similarly, the process controlling post-closure subsidence results primarily from void space within and between containers, and the container is assumed to degrade and collapse within 100 years.

  15. Liquid Fuels via Uprading of Syngas Intermediates Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2015 Project Peer Review March 26, 2015 Liquid Fuels via Upgrading of Syngas Intermediates 2.3.1.305/2.3.1.306 Jesse Hensley - NREL Ted Krause - ANL This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office 2.3.1.305/2.3.1.306 Goal Statement Project Goal - To develop and demonstrate catalyst technologies that convert biomass-derived synthesis gas to drop-in hydrocarbon fuels and to reduce total cost from the FY14 SOT

  16. Independent Review of Elemental Phosphorus Remediation at the Eastern Michaud Flats FMC Operable Unit near Pocatello, Idaho

    SciTech Connect (OSTI)

    Martino, L. E.; Jerden, J. J.; Kimmell, T. A.; Quinn, J.

    2016-01-01

    If, despite risks to workers and these potential impacts, stakeholders decide that P4 wastes need to be excavated and treated, the Review Team determined that a number of the ETTs examined warrant further consideration for the treatment of P4 waste that has been characterized (for example, P4 waste present in the historical ponds). Nevertheless, concerns about the health and safety of site investigation workers using then-available investigation approaches prevented the collection of subsurface samples containing P4 from large areas of the site (e.g., the railroad swale, the vadose zone beneath the Furnace Building, and the abandoned railcars), As a result, the contaminant CSM in those particular areas was not refined enough to allow the Review Team to draw conclusions about using some of the ETTs to treat P4 waste in those areas. The readiness of an ETT for implementation varies depending on many factors, including stakeholder input, permitting, and remedial action construction requirements. Technologies that could be ready for use in the near term (within 1 year) include the following: mechanical excavation, containment technologies, off-site incineration, and drying and mechanical mixing under a tent structure. Technologies that could be ready for use in the mid-term (1 to 2 years) include cutter suction dredging, thermal-hydraulic dredging, and underground pipeline cleaning technologies. Technologies requiring a longer lead time (2 to 5 years) include on-site incineration, a land disposal restriction waste treatment system, an Albright & Wilson batch mud still, post-treatment on-site disposal, and post-treatment off-site disposal.

  17. INDEPENDENT TECHNICAL REVIEW OF THE BUILDING 100 PLUME, FORMER DOE PINELLAS SITE (YOUNG - RAINEY STAR CENTER), LARGO, FLORIDA

    SciTech Connect (OSTI)

    Eddy-Dilek, C.; Rossabi, J.; Amidon, M.; Riha, B.; Kaback, D.

    2010-07-30

    Contaminated groundwater associated with Building 100 at the Young-Rainey Science, Technology, and Research Center, formerly the DOE Pinellas plant, is the primary remedial challenge that remains to be addressed at the site. Currently, Building 100 is an active industrial facility that is now owned and operated by the Pinellas county government. Groundwater samples collected from monitoring wells recently installed near the southern boundary of the site suggest that contaminated groundwater has migrated off the plant site. In response to the challenges presented by the Building 100 plume, the Office of Legacy Management (LM) requested assistance from the DOE Office of Groundwater and Soil Remediation (EM-32) to provide a review team to make technical recommendations so that they can efficiently and effectively address characterization and remediation of the plume. The review team was unanimous in the conclusion that a dynamic strategy that combines a phased implementation of direct push samplers, sensors, and tools can be used to better delineate the extent of contamination, control plume migration, and rapidly remediate the contaminated groundwater at the site. The initial efforts of the team focused on reviewing the site history and data, organizing the information into a conceptual model, identifying appropriate technologies, and recommending an integrated strategy. The current groundwater data from the site indicate a two-lobed plume extending to the east and south. To the east vinyl chloride is the primary contaminant of concern, to the south, vinyl chloride and cis1, 2-DCE are the primary contaminants. The limited data that are available suggest that reductive dechlorination of the TCE is already occurring but is not sufficient to prevent offsite migration of low concentrations of TCE daughter products. The team recommends that DOE pursue a strategy that builds on the natural cleansing capacity of the subsurface with reductive methods including biostimulation and/or bioaugmentation to provide a sustainable remediation system within the flow path of the plume. Additional data will be required to implement this approach and will include: (1) Better delineation of the nature and extent of contamination; (2) Demonstration the plume is currently stable or shrinking; and (3) Demonstration the full reductive dechlorination is occurring. The technical team recommends that DOE use a phased approach to identify residual contamination and to provide rapid installation of remedies. Matrices of characterization and remediation sensors, technologies, and tools were developed by the team in order to match the specific conditions and requirements of the site. The team provides a specific example of remedy that includes the incorporation of a dynamic characterization strategy moving from minimally invasive to more aggressive field techniques, the consideration of multiple complementary remediation approaches based on a spatiotemporally phased approach keyed to the different demands of different parts of the plume, and the integration and sequencing of the characterization and remediation activities.

  18. Project Construction Photos | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Project Construction Photos Project Assessment (OPA) OPA Home About Project Management SC Projects Review Dates (updated March 2016) Project Construction Photos Completed Projects Current Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: Email Us SC Projects Project Construction Photos Print Text

  19. Hydrolyzed Lignocellulose as a Feedstock for Fuels Synthesis Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Unclassified DOE Bioenergy Technologies Office (BETO) 2015 Project Peer Review FY 14-15: Hydrolyzed Lignocellulose as a Feedstock for Fuels Synthesis 25 th March 2015 Biochemical Conversion PI: John C. Gordon. Co-PI: Andrew D. Sutton Los Alamos National Laboratory Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA UNCLASSIFIED Unclassified Goal Statement  Use mild conditions and simple catalysts in chemical processes to convert biomass hydrolysates to fuels

  20. Advanced Biofuels (and Bio-products) Process Demonstration Unit Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Biofuels (and Bio-products) Process Demonstration Unit Todd Pray, PhD, MBA March 25, 2015 Biochemical Conversion Area DOE Bioenergy Technologies Office (BETO) Project Peer Review Washington, DC ABPDU Goals Build a process demonstration unit to support BETO's mission in addressing key barriers to biofuel and bio-economy development, - and - Partner with researchers from industry, the National Labs, and academia to optimize and scale technologies to enable bio-based chemicals, materials, and fuels

  1. Novel Electro-Deoxygenation Process Presentation for Bio Oil Upgrading for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Thermochemical Conversion S. (Elango) Elangovan DOE Bioenergy Technologies Office (BETO) 2015 Project Peer Review Novel Electro-Deoxygenation Process for Bio Oil Upgrading This presentation does not contain any proprietary, confidential, or otherwise restricted information * Demonstrate the techno-economic feasibility of upgrading biomass derived pyrolysis oil using electro-deoxygenation process * Move technology from concept stage (TRL 1) to practical, applied R&D at TRL 2-3 * Advance

  2. Pretreatment and Process Hydrolysis Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    23, 2015 Biochemical Conversion Platform Melvin Tucker National Renewable Energy Laboratory 2015 DOE Bioenergy Technologies Office (BETO) Project Peer Review Pretreatment and Process Hydrolysis 2.2.3.100 This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 Goal Statement To produce high concentration sugar and reactive lignin streams at high yields and low costs from biomass to meet BETO's 2017 ($5/GGE) and 2022 ($3/GGE) Goals and Targets. *

  3. Electrochemical Methods of Upgrading Pyrolysis Oils Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Bioenergy Technologies Office 2015 Project Peer Review Electrochemical Methods of Upgrading Pyrolysis Oils Tedd Lister (INL), Mike Lilga (PNNL), and YuPo Lin (ANL) March 24, 2015 2 | Bioenergy Technologies Office eere.energy.gov Goal Statement * Problem: Bio-oil processing through thermal hydrodeoxygenation is an expensive, multi-stage process requiring significant H 2 at high pressure * Goal: Achieve an electrochemical process to economically hydrotreat pyrolysis oils under mild conditions

  4. Biochemical Process Modeling and Simulation Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2015 Project Peer Review Biochemical Process Modeling and Simulation 25 March 2015 Biochemical Platform Michael Crowley NREL This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 Goal Statement Cellulase Action Lignin Binding LPMO mechanism Reactor Design Understand relevant processes at Molecular Level Predict improved enzymes, pathways, and process parameters. Test and select best hypotheses from experiment Streamline path to improved biofuel

  5. Biogas to Liquid Fuels and Chemicals Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Biogas to Liquid Fuels and Chemicals Using a Methanotrophic Microorganism WBS 2.3.2.102 2015 DOE BioEnergy Technologies Office (BETO) Project Peer Review March 24, 2015 Technology Area: Biochemical Conversion Principal Investigator: Michael T. Guarnieri Organization: National Renewable Energy Laboratory 2 Goal Statement Goals 1. Demonstrate proof of concept for a biogas-to-liquid fuels and chemicals process. 2. Enhance carbon conversion efficiency from methane to biomass and products. Outcome:

  6. Brazil Bilateral: Petrobras-NREL CRADA Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Bioenergy Technologies Office (BETO) 2015 Project Peer Review 2.4.2.303 Brazil Bilateral: Petrobras-NREL CRADA March 25, 2015 BETO Area: Thermochemical Conversion NREL AOP: Industry and Refinery Integration Helena L. Chum, National Renewable Energy Laboratory Andrea Pinho, Petrobras / CENPES This presentation does not contain any proprietary, confidential, or otherwise restricted information In collaboration with Barry Freel, Ensyn Corp. 2 Goal Statements * Demonstrate technical and economic

  7. Cellulosic Biomass Sugars to Advantaged Jet Fuel Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cellulosic Biomass Sugars to Advantaged Jet Fuel 25 March, 2015 Technology Area Review: Biochemical Conversion Randy Cortright PhD Virent, Inc WBS: 2.4.1.200 This presentation does not contain any proprietary, confidential, or otherwise restricted information © Virent 2015 Slide 2 Goal Statement Project Goal - Integrate Virent's Catalytic BioForming® Process with NREL's Biochemical deconstruction technology to efficiently produce cost effective "drop-in" fuels from corn stover with

  8. Thermochemical Conversion - Feedstock Interface, Bio-oils Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 | Bioenergy Technologies Office Content 1 | Bioenergy Technologies Office eere.energy.gov 2015 DOE Bioenergy Technologies Office (BETO) Project Peer Review March 23-27, 2015 Thermochemical Conversion - Feedstock Interface, Bio-oils Mar. 27, 2015 Tyler Westover, Idaho National Laboratory (WBS 2.2.1.301) Daniel Carpenter, National Renewable Energy Laboratory Daniel Howe, Pacific Northwest National Laboratory This presentation does not contain any proprietary, confidential, or otherwise

  9. Synthetic Biology for Tailored Enzyme Cocktails Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 2015 SynTec Synthetic Biology for Tailored Enzyme Cocktails DOE Bioenergy Technologies Office (BETO) 2015 Project Peer Review Biochemical Conversion Sarah Teter Novozymes, Inc This presentation does not contain any proprietary, confidential, or otherwise restricted information NOVOZYMES PRESENTATION 26 Mar 2015 2 ACCELERATE INNOVATION IN ENZYME DISCOVERY REDUCE COSTS FOR PRODUCING CELLULOSIC SUGARS  Deliver a screening platform which can be used to reduce discovery time required for

  10. Fermilab | Directorate | Office of Project Management Oversight...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for Projects, Dec 7, 2009 DOE Presentations External Independent Reviews, 11.14.2006 by Catherine Santana Dan Lehman Briefing on DOE O 413.3B, 02.23.2011 Last modified: 08262015...

  11. River Protection Project Integrated safety management system phase II verification review plan - 7/29/99

    SciTech Connect (OSTI)

    SHOOP, D.S.

    1999-09-10

    The purpose of this review is to verify the implementation status of the Integrated Safety Management System (ISMS) for the River Protection Project (RPP) facilities managed by Fluor Daniel Hanford, Inc. (FDH) and operated by Lockheed Martin Hanford Company (LMHC). This review will also ascertain whether within RPP facilities and operations the work planning and execution processes are in place and functioning to effectively protect the health and safety of the workers, public, environment, and federal property over the RPP life cycle. The RPP ISMS should support the Hanford Strategic Plan (DOERL-96-92) to safely clean up and manage the site's legacy waste and deploy science and technology while incorporating the ISMS central theme to ''Do work safely'' and protect human health and the environment.

  12. Small Wind Independent Testing (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2010-09-01

    This fact sheet describes the Small Wind Independent Testing at the NWTC and the Regional Test Centers project.

  13. 2013 Geothermal Technologies Office Peer Review Report

    SciTech Connect (OSTI)

    none,

    2014-01-01

    Geothermal Technologies Office conducted its annual program peer review in April of 2013. The review provided an independent, expert evaluation of the technical progress and merit of GTO-funded projects. Further, the review was a forum for feedback and recommendations on future GTO strategic planning. During the course of the peer review, DOE-funded projects were evaluated for 1) their contribution to the mission and goals of the GTO and 2) their progress against stated project objectives. Principal Investigators (PIs) came together in sessions organized by topic tracks to disseminate information, progress, and results to a panel of independent experts as well as attendees.

  14. Hawaii Energy Strategy Project 2: Fossil Energy Review. Task IV. Scenario development and analysis

    SciTech Connect (OSTI)

    Yamaguchi, N.D.; Breazeale, K.

    1993-12-01

    The Hawaii Energy Strategy (HES) Program is a seven-project effort led by the State of Hawaii Department of Business, Economic Development & Tourism (DBEDT) to investigate a wide spectrum of Hawaii energy issues. The East-West Center`s Program on Resources: Energy and Minerals, has been assigned HES Project 2, Fossil Energy Review, which focuses on fossil energy use in Hawaii and the greater regional and global markets. HES Project 2 has four parts: Task I (World and Regional Fossil Energy Dynamics) covers petroleum, natural gas, and coal in global and regional contexts, along with a discussion of energy and the environment. Task II (Fossil Energy in Hawaii) focuses more closely on fossil energy use in Hawaii: current utilization and trends, the structure of imports, possible future sources of supply, fuel substitutability, and energy security. Task III`s emphasis is Greenfield Options; that is, fossil energy sources not yet used in Hawaii. This task is divided into two sections: first, an in-depth {open_quotes}Assessment of Coal Technology Options and Implications for the State of Hawaii,{close_quotes} along with a spreadsheet analysis model, which was subcontracted to the Environmental Assessment and Information Sciences Division of Argonne National Laboratory; and second, a chapter on liquefied natural gas (LNG) in the Asia-Pacific market and the issues surrounding possible introduction of LNG into the Hawaii market.

  15. Advanced Mixed Waste Treatment Project melter system preliminary design technical review meeting

    SciTech Connect (OSTI)

    Eddy, T.L.; Raivo, B.D.; Soelberg, N.R.; Wiersholm, O.

    1995-02-01

    The Idaho National Engineering Laboratory Advanced Mixed Waste Treatment Project sponsored a plasma are melter technical design review meeting to evaluate high-temperature melter system configurations for processing heterogeneous alpha-contaminated low-level radioactive waste (ALLW). Thermal processing experts representing Department of Energy contractors, the Environmental Protection Agency, and private sector companies participated in the review. The participants discussed issues and evaluated alternative configurations for three areas of the melter system design: plasma torch melters and graphite arc melters, offgas treatment options, and overall system configuration considerations. The Technical Advisory Committee for the review concluded that graphite arc melters are preferred over plasma torch melters for processing ALLW. Initiating involvement of stakeholders was considered essential at this stage of the design. For the offgas treatment system, the advisory committee raised the question whether to a use wet-dry or a dry-wet system. The committee recommended that the waste stream characterization, feed preparation, and the control system are essential design tasks for the high-temperature melter treatment system. The participants strongly recommended that a complete melter treatment system be assembled to conduct tests with nonradioactive surrogate waste material. A nonradioactive test bed would allow for inexpensive design and operational changes prior to assembling a system for radioactive waste treatment operations.

  16. JLab's 12 GeV Upgrade Project Clears Critical Hurdle | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    JLab's 12 GeV Upgrade Project Clears Critical Hurdle Independent Project Review committee members Independent Project Review committee members, visiting JLab to evaluate the readiness of the 12 GeV Upgrade project, tour Hall B during their site visit. Here they view the CEBAF Large Acceptance Spectrometer as Hall B Leader Volker Burkert and Lead Engineer Dave Kashy explain the system. NEWPORT NEWS, VA - The U.S. Department of Energy's Thomas Jefferson National Accelerator Facility successfully

  17. Enterprise Assessments Targeted Review, Idaho Site AMWTP Report - January

    Office of Environmental Management (EM)

    2015 | Department of Energy Site AMWTP Report - January 2015 Enterprise Assessments Targeted Review, Idaho Site AMWTP Report - January 2015 January, 2015 Review of the Fire Protection Program at the Idaho Site Advanced Mixed Waste Treatment Project The U.S. Department of Energy independent Office of Enterprise Assessments (EA), Office of Environment, Safety and Health Assessments, conducted an independent review of the Advanced Mixed Waste Treatment Project (AMWTP) fire protection program

  18. Program Evaluation: Independence, Conflict of Interest, Openness |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Planning & Conducting Evaluations » Program Evaluation: Independence, Conflict of Interest, Openness Program Evaluation: Independence, Conflict of Interest, Openness This page discusses the aspects of independence, conflict of interest, and public vs. closed sessions, in preparation for successful peer reviews. Independence The review leader and the program manager should decide at the outset the desired level of independence and the degree of external control for

  19. Independent Oversight Follow-up Review of Activity Level Implementation of Radiation Controls and Radiological Work Planning at the Materials and Fuels Complex of the Idaho Site, January 2014

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Oversight Follow-Up Review of Activity Level Implementation of Radiation Controls and Radiological Work Planning at the Materials and Fuels Complex of the Idaho Site January 2014 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0

  20. Independent Oversight Lessons Learned from the 2013 Targeted Reviews of Emergency Preparedness for Severe Natural Phenomena Events at Selected Department of Energy Facilities- February 2014

    Broader source: Energy.gov [DOE]

    Targeted Reviews of Emergency Preparedness for Severe Natural Phenomena Events at Selected Department of Energy Facilities

  1. 2013 Annual Merit Review Results Report - Project and Program Statistical Calculations Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -1 12. Project and Program Statistics Calculations Overview A numerical evaluation of each project within each subprogram area and a comparison to the other projects within the subprogram area necessitates a statistical comparison of the projects utilizing specific criteria. For each project, a representative set of experts in the project's field were selected to evaluate the project based upon the criteria indicated in the Introduction. Each evaluation criterion's sample mean and variance were

  2. Low-Energy Magnetic Field Separation of Hydrocarbons using Nanostructured Adsorbents Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6, 2015 Biochemical Conversion Philip D. Laible Argonne National Laboratory DOE Bioenergy Technologies Office (BETO) 2015 Project Peer Review 2.5.5.100: Low-Energy Magnetic Field Separation of Hydrocarbons using Nanostructured Adsorbents This presentation does not contain any proprietary, confidential, or otherwise restricted information Project Goals  Improve biochemical conversion process through integration of nanostructured adsorbents as separations agents in fermentation - Allows for

  3. Demonstration of Pyrolysis Biorefinery Concept for Biopower, Biomaterials and Biochar Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Avello® and Bioasphalt® are trademarks of Avello Bioenergy, Inc. Copyright © 2015 All rights reserved. 2015 DOE Bioenergy Technologies Office (BETO) Project Peer Review Demonstration of Pyrolysis Biorefinery Concept for Biopower, Biomaterials and Biochar March 25, 2015 Thermochemical Conversion Peer Review Dennis S Banasiak, PhD Avello Bioenergy, Inc. This presentation does not contain any proprietary, confidential, or otherwise restricted information TM Avello® and Bioasphalt® are

  4. Determining the Impact of MSW as a Feedstock Blending Agent Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE BioEnergy Technologies Office (BETO) Project Peer Review Date: March 23 th , 2015 Technology Review Area: Feedstock- Conversion Interface Determining the Impact of MSW as a Feedstock Blending Agent (WBS 2.2.1.103- 105) Principal Investigators: Seema Singh (SNL), Vicki Thompson (INL), Todd Pray (ABPDU) Organizations: Sandia National Lab, Idaho National Lab, Advanced Biofuels Process Demonstration Unit 2 | Bioenergy Technologies Office Goal Statement * Goal and outcome: Identify the optimal

  5. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 87

    SciTech Connect (OSTI)

    1997-10-01

    Approximately 30 research projects are summarized in this report. Title of the project, contract number, company or university, award amount, principal investigators, objectives, and summary of technical progress are given for each project. Enhanced oil recovery projects include chemical flooding, gas displacement, and thermal recovery. Most of the research projects though are related to geoscience technology and reservoir characterization.

  6. Check Estimates and Independent Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Check estimates and independent cost estimates (ICEs) are tools that can be used to validate a cost estimate. Estimate validation entails an objective review of the estimate to ensure that estimate criteria and requirements have been met and well documented, defensible estimate has been developed. This chapter describes check estimates and their procedures and various types of independent cost estimates.

  7. Tri-State Synfuels Project Review: Volume 12. Fluor project status. [Proposed Henderson, Kentucky coal to gasoline plant; engineering

    SciTech Connect (OSTI)

    Not Available

    1982-06-01

    The purpose of this report is to document and summarize activities associated with Fluor's efforts on the Tri-State Synfuels Project. The proposed facility was to be coal-to-transport fuels facility located in Henderson, Kentucky. Tri-State Synfuels Company was participating in the project as a partner of the US Department of Energy per terms of a Cooperative Agreement resulting from DOE's synfuel's program solicitation. Fluor's initial work plan called for preliminary engineering and procurement services to the point of commitment for construction for a Sasol Fischer-Tropsch plant. Work proceeded as planned until October 1981 when results of alternative coal-to-methanol studies revealed the economic disadvantage of the Synthol design for US markets. A number of alternative process studies followed to determine the best process configuration. In January 1982 Tri-State officially announced a change from Synthol to a Methanol to Gasoline (MTG) design basis. Further evaluation and cost estimates for the MTG facility eventually led to the conclusion that, given the depressed economic outlook for alternative fuels development, the project should be terminated. Official announcement of cancellation was made on April 13, 1982. At the time of project cancellation, Fluor had completed significant portions of the preliminary engineering effort. Included in this report are descriptions and summaries of Fluor's work during this project. In addition location of key project data and materials is identified and status reports for each operation are presented.

  8. FEMP Best Practices and Lessons Learned for Federal Agency ESPC Projects: Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8. REVIEW OF THE IGA/PROPOSAL - STRATEGY FOR SUCCESS Agency review of the IGA/proposal has been noted as a potential bottleneck in the ESPC process. To expedite thorough and timely agency review: 8.1 Hold an in-person conference with the ESCO promptly after completion of the IGA to review findings and discuss potential challenges. 8.2 Establish a hard deadline for agency review of the IGA and response to the ESCO. 8.3 Develop a review plan and set aside focused review time. Assign overall review

  9. DOE responses to Ecology review comments for ``Sampling and analysis plans for the 100-D Ponds voluntary remediation project``

    SciTech Connect (OSTI)

    NONE

    1996-12-31

    The Sampling and Analysis Plan describes the sampling and analytical activities which will be performed to support closure of the 100-D Ponds at the Hanford Reservation. This report contains responses by the US Department of Energy to Ecology review for ``Sampling and Analysis Plan for the 100-D Ponds Voluntary Remediation Project.``

  10. Review and analysis of proposed EPA groundwater standards for the UMTRA Project. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect (OSTI)

    Not Available

    1987-10-01

    The Title I groundwater standards for inactive uranium mill tailings sites, which were promulgated on January 5, 1983, by the US Environmental Protection Agency (EPA) for the Uranium Mill Tailings Remedial Action (UMTRA) Project, were remanded to the EPA on September 3, 1985, by the US Tenth Circuit Court of Appeals. The Court instructed the EPA to compile general groundwater standards for all sites. On September 24, 1987, the EPA published proposed standards in response to the remand. This Summary Report includes an evaluation of the potential effects of the proposed EPA groundwater standards on the UMTRA Project as well as a discussion of the DOE's position on the proposed standards. This report is accompanied by a detailed Technical Report and Appendices which provide supporting information and analyses. This Summary Report results from a study undertaken to: determine the impact of the proposed standards on the UMTRA Project; and recommend provisions for the implementation of the final standards that will minimize adverse impact to the conduct of the UMTRA Project while ensuring protection of human health and the environment. Specifically, the following were considered: the flexibility of the proposed standards; interpretations of the proposed standards; the extent of aquifer restoration that may be required to implement the proposed standards at each site; the costs of aquifer restoration; and design changes necessary to meet the standards.

  11. Independent Verification and Validation Of SAPHIRE 8 Volume 3 Users' Guide Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-03-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE 8 Volume 3 Users Guide is to assess the user documentation for its completeness, correctness, and consistency with respect to requirements for user interface and for any functionality that can be invoked by the user. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

  12. Bell Independent Power Corporation | Open Energy Information

    Open Energy Info (EERE)

    Sector: Biofuels, Biomass, Services Product: BIP provides engineering, financial and feasibility services for biofuels, biomass and STEG projects. References: Bell Independent...

  13. Program Evaluation: Define Review Purpose and Scope | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Define Review Purpose and Scope Program Evaluation: Define Review Purpose and Scope The first step in preparation for a particular peer review is to determine the specific purpose and scope of the review within the context of other review and management activities. Improving program management and demonstrating public accountability, providing an honest independent technical review of the projects and program, and communicating the value of the programs to the larger public are all potentially

  14. MicroBooNE Project Quarterly Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Quarterly Reports Fiscal 2010 Qtr-3 Apr-May-Jun Qtr-4 Jul-Aug-Sep Fiscal 2011 Qtr-1 Oct-Nov-Dec Qtr-2 Jan-Feb-Mar Qtr-3 Apr-May-Jun Qtr-4 Jul-Aug-Sep DOE Reviews CD-0 Mission Need Statement DOE CD-1 Review 03/2-3/2010 DOE CD-2 Review 8/10-11/2011 DOE CD-3 Review - no date Fermilab Director's Reviews Initial Director's Review 11/4-6/2009 Director's CD2 Requirements Progress 3/29-30-31/2011 Independent Design and Director's CD-2 Review 7/12-14/2011 CD-3 Readiness - no date

  15. Independent Activity Report, Argonne National Laboratory - July...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    performing a review of the technical safety requirements for the Alpha-Gamma Hot Cell Facility, a hazard category 2 nuclear facility. PDF icon Independent Activity...

  16. Independent Activity Report, Los Alamos National Laboratory ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    July 2012 Independent Activity Report, Los Alamos National Laboratory - July 2012 July 2012 Initial Meeting of Representatives from LANL, LASO, and HS-45 To Review Progress and...

  17. Enterprise Assessments Review of the Hanford Site Waste Treatment and

    Energy Savers [EERE]

    Immobilization Plant Project Engineering Processes - October 2015 | Department of Energy Project Engineering Processes - October 2015 Enterprise Assessments Review of the Hanford Site Waste Treatment and Immobilization Plant Project Engineering Processes - October 2015 October 2015 Review of Engineering Processes at the Hanford Site Waste Treatment and Immobilization Plant Project The U.S. Department of Energy Office of Environment, Safety and Health Assessments, within the independent

  18. Voluntary Protection Program Onsite Review, Soil and Groundwater Remediation Project- March 2007

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether Soil and Groundwater Remediation Project is performing at a level deserving DOE-VPP recognition.

  19. Projecting

    U.S. Energy Information Administration (EIA) Indexed Site

    Projecting the scale of the pipeline network for CO2-EOR and its implications for CCS ... for CO 2 -EOR and CO 2 transportation for CCS assuming a carbon price are discussed. ...

  20. Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Uinit Contractor Operational Readiness Review, June 2012

    Office of Environmental Management (EM)

    Contractor Operational Readiness Review June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background

  1. Independent Verification and Validation Of SAPHIRE 8 Software Acceptance Test Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-03-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE 8 Software Acceptance Test Plan is to assess the approach to be taken for intended testing activities. The plan typically identifies the items to be tested, the requirements being tested, the testing to be performed, test schedules, personnel requirements, reporting requirements, evaluation criteria, and any risks requiring contingency planning. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

  2. Independent Verification and Validation Of SAPHIRE 8 Software Configuration Management Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2009-10-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE configuration management is to assess the activities that results in the process of identifying and defining the baselines associated with the SAPHIRE software product; controlling the changes to baselines and release of baselines throughout the life cycle; recording and reporting the status of baselines and the proposed and actual changes to the baselines; and verifying the correctness and completeness of baselines.. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

  3. Independent Verification and Validation Of SAPHIRE 8 Software Configuration Management Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-02-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE configuration management is to assess the activities that results in the process of identifying and defining the baselines associated with the SAPHIRE software product; controlling the changes to baselines and release of baselines throughout the life cycle; recording and reporting the status of baselines and the proposed and actual changes to the baselines; and verifying the correctness and completeness of baselines.. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

  4. Building Technologies Office 2015 Program Peer Review | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 5 Program Peer Review Building Technologies Office 2015 Program Peer Review The 2015 Department of Energy (DOE) Building Technologies Office (BTO) Peer Review was held April 14-16, 2015 in Vienna, Virginia. This third annual review encompassed many of BTO's active research, development, demonstration and deployment projects. Independent experts assessed the progress and contributions of each project toward BTO's mission and goals, and these assessments will be used to enhance the

  5. Review of project definition studies of possible on-site uses of superconducting super collider assets and facilities

    SciTech Connect (OSTI)

    1994-12-01

    This document reports on the results of a peer review and evaluation of studies made of potential uses of assets from the terminated Superconducting Super Collider (SSC) project. These project definition studies focused on nine areas of use of major assets and facilities at the SSC site near Waxahachie, Texas. The studies were undertaken as part of the effort to maximize the value of the investment made in the SSC and were supported by two sets of grants, one to the Texas National Research Laboratory Commission (TNRLC) and the second to various universities and other institutions for studies of ideas raised by a public call for expressions of interest. The Settlement Agreement, recently signed by the Department of Energy (DOE) and TNRLC, provides for a division of SSC property. As part of the goal of maximizing the value of the SSC investment, the findings contained in this report are thus addressed to officials in both the Department and TNRLC. In addition, this review had several other goals: to provide constructive feedback to those doing the studies; to judge the benefits and feasibility (including funding prospects) of the projects studied; and to help worthy projects become reality by matching projects with possible funding sources.

  6. Review of project definition studies of possible on-site uses of superconducting super collider assets and facilities. Final report

    SciTech Connect (OSTI)

    1994-12-01

    This document reports on the results of a peer review and evaluation of studies made of potential uses of assets from the terminated Superconducting Super Collider (SSC) project. These project definition studies focused on nine areas of use of major assets and facilities at the SSC site near Waxahachie, Texas. The studies were undertaken as part of the effort to maximize the value of the investment made in the SSC and were supported by two sets of grants, one to the Texas National Research Laboratory Commission (TNRLC) and the second to various universities and other institutions for studies of ideas raised by a public call for expressions of interest. The Settlement Agreement, recently signed by the Department of Energy (DOE) and TNRLC, provides for a division of SSC property. As part of the goal of maximizing the value of the SSC investment, the findings contained in this report are thus addressed to officials in both the Department and TNRLC. In addition, this review had several other goals: to provide constructive feedback to those doing the studies; to judge the benefits and feasibility (including funding prospects) of the projects studied; and to help worthy projects become reality by matching projects with possible funding sources.

  7. Review of Nuclear Safety Culture at the Hanford Site Waste Treatment and

    Energy Savers [EERE]

    Immobilization Plant Project, October 2010 | Department of Energy Review of Nuclear Safety Culture at the Hanford Site Waste Treatment and Immobilization Plant Project, October 2010 Review of Nuclear Safety Culture at the Hanford Site Waste Treatment and Immobilization Plant Project, October 2010 October 2010 Report for independent review of the nuclear safety culture at the Waste Treatment and Immobilization Plant (WTP) project at DOE's Hanford Site. This report provides the results of a

  8. NEW - DOE P 481.1, DOE's Policy Regarding Laboratories, Plants and Sites Engaging in Strategic Partnership Projects with Other Federal Agencies, Independent Organizations, and the Private Sector

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The purpose of this Policy is to set the context in which DOE and its laboratories, plants, and sites should pursue Strategic Partnership Projects (SSP) with other Federal government agencies, state and local institutions, universities, foreign entities and/or private companies. The Policy is applicable to the DOE laboratories, plants, and sites, and to the DOE programs that own them and facilitate their work.

  9. DOE's Policy Regarding Laboratories, Plants and Sites Engaging in Strategic Partnership Projects with Other Federal Agencies, Independent Organizations, and the Private Sector

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-12-17

    The purpose of this Policy is to set the context in which DOE and its laboratories, plants, and sites should pursue Strategic Partnership Projects (SPP) with other Federal government agencies, state and local institutions, universities, foreign entities and/or private companies. The Policy is applicable to the DOE laboratories, plants, and sites, and to the DOE programs that own them and facilitate their work. Does not cancel/supersede other directives.

  10. Fractional Multistage Hydrothermal Liquefaction of Biomass and Catalytic Conversion into Hydrocarbons Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March, 2015 Technology Area Review: Thermochemical Conversion Randy Cortright PhD Virent, Inc WBS: 2.5.5.401 Fractional Multistage Hydrothermal Liquefaction of Biomass and Catalytic Conversion into Hydrocarbons © Virent 2015 Slide 2 Goal Statement Project Goal - Develop a novel Multistage Hydrothermal Liquefaction (HTL) of biomass and integrate with Virent's Catalytic BioForming® Process to efficiently produce cost effective "drop-in" fuels from woody biomass and corn stover, with

  11. Conversion of Lignocellulosic Feedstocks to Aromatic Fuels and High Value Chemicals Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Catalytic Upgrading of Thermochemical Intermediates to Hydrocarbons: Conversion of Lignocellulosic Feedstocks to Aromatic Fuels and High Value Chemicals 25 March, 2015 Technology Area Review: Thermochemical Conversion Randy Cortright PhD Virent, Inc WBS: 2.3.1.406 This presentation does not contain any proprietary, confidential, or otherwise restricted information © Virent 2015 - Virent Slide 2 Goal Statement Project Goal -Develop and demonstrate integration of Virent's lignocellulosic biomass

  12. Development and Standardization of Techniques for Bio-oil Characterization Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 2015 DOE BETO 2015 Project Peer Review: Conversion R&D Development and Standardization of Techniques for Bio-oil Characterization Jack Ferrell, NREL; Mariefel V. Olarte, Asanga Padmaperuma, PNNL This presentation does not contain any proprietary, confidential, or otherwise restricted information Problem Statement 2 Fast Pyrolysis Upgrading Hydrotreating Biomass Hydrocarbon Biofuels Standard analytical methods needed * Path to cost competitive biofuels requires innovation in each

  13. Waste-To-Energy Techno-Economic Analysis and Life-Cycle Analysis Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste-To-Energy Techno-Economic Analysis and Life-Cycle Analysis March 24, 2015 Conversion Ling Tao†, Jeongwoo Han* †National Renewable Energy Laboratory *Argonne National Laboratory DOE Bioenergy Technologies Office (BETO) 2015 Project Peer Review 2 | Bioenergy Technologies Office Goal Statement * Conduct the techno-economic analysis (TEA) and life-cycle analysis (LCA) of Waste-To-Energy (WTE) pathways to evaluate their economic viability and environmental sustainability - Strategic

  14. Voluntary Protection Program Onsite Review, West Valley Demonstration Project- November 2009

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether West Valley Demonstration Project is continuing to perform at a level deserving DOE-VPP Star recognition.

  15. Voluntary Protection Program Onsite Review, West Valley Demonstration Project- June 2008

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether West Valley Demonstration Project is continuing to perform at a level deserving DOE-VPP Star recognition.

  16. Voluntary Protection Program Onsite Review, Advanced Mixed Waste Treatment Project- May 2009

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether Advanced Mixed Waste Treatment Project is continuing to perform at a level deserving DOE-VPP Star recognition.

  17. Voluntary Protection Program Onsite Review, Plutonium Finishing Plant Closure Project- May 2007

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether Plutonium Finishing Plant Closure Project is continuing to perform at a level deserving DOE-VPP Star recognition.

  18. Voluntary Protection Program Onsite Review, Waste Treatment Plant Construction Project- June 2010

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether Waste Treatment Plant Construction Project is continuing to perform at a level deserving DOE-VPP Star recognition.

  19. Voluntary Protection Program Onsite Review, CH2M WG LLC, Idaho Cleanup Project March 2014

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether CH2M WG LLC, Idaho Cleanup Project is performing at a level deserving DOE-VPP Star recognition.

  20. Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-03-01

    This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.