Sample records for independent expert review

  1. Independent Peer Reviews

    SciTech Connect (OSTI)

    2012-03-16

    Independent Assessments: DOE's Systems Integrator convenes independent technical reviews to gauge progress toward meeting specific technical targets and to provide technical information necessary for key decisions.

  2. Independent technical review, handbook

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    Purpose Provide an independent engineering review of the major projects being funded by the Department of Energy, Office of Environmental Restoration and Waste Management. The independent engineering review will address questions of whether the engineering practice is sufficiently developed to a point where a major project can be executed without significant technical problems. The independent review will focus on questions related to: (1) Adequacy of development of the technical base of understanding; (2) Status of development and availability of technology among the various alternatives; (3) Status and availability of the industrial infrastructure to support project design, equipment fabrication, facility construction, and process and program/project operation; (4) Adequacy of the design effort to provide a sound foundation to support execution of project; (5) Ability of the organization to fully integrate the system, and direct, manage, and control the execution of a complex major project.

  3. CONTAIN independent peer review

    SciTech Connect (OSTI)

    Boyack, B.E. [Los Alamos National Lab., NM (United States); Corradini, M.L. [Univ. of Wisconsin, Madison, WI (United States). Nuclear Engineering Dept.; Denning, R.S. [Battelle Memorial Inst., Columbus, OH (United States); Khatib-Rahbar, M. [Energy Research Inc., Rockville, MD (United States); Loyalka, S.K. [Univ. of Missouri, Columbia, MO (United States); Smith, P.N. [AEA Technology, Dorchester (United Kingdom). Winfrith Technology Center

    1995-01-01

    The CONTAIN code was developed by Sandia National Laboratories under the sponsorship of the US Nuclear Regulatory Commission (NRC) to provide integrated analyses of containment phenomena. It is used to predict nuclear reactor containment loads, radiological source terms, and associated physical phenomena for a range of accident conditions encompassing both design-basis and severe accidents. The code`s targeted applications include support for containment-related experimental programs, light water and advanced light water reactor plant analysis, and analytical support for resolution of specific technical issues such as direct containment heating. The NRC decided that a broad technical review of the code should be performed by technical experts to determine its overall technical adequacy. For this purpose, a six-member CONTAIN Peer Review Committee was organized and a peer review as conducted. While the review was in progress, the NRC issued a draft ``Revised Severe Accident Code Strategy`` that incorporated revised design objectives and targeted applications for the CONTAIN code. The committee continued its effort to develop findings relative to the original NRC statement of design objectives and targeted applications. However, the revised CONTAIN design objectives and targeted applications. However, the revised CONTAIN design objectives and targeted applications were considered by the Committee in assigning priorities to the Committee`s recommendations. The Committee determined some improvements are warranted and provided recommendations in five code-related areas: (1) documentation, (2) user guidance, (3) modeling capability, (4) code assessment, and (5) technical assessment.

  4. ORISE: Peer Review Expert Identification

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    locates contacts through relevant professional organizations, public lists and the Internet. How ORISE identifies and locates candidate reviewers (graphic) Once candidates are...

  5. External Independent Review (EIR) Standard Operating Procedure...

    Broader source: Energy.gov (indexed) [DOE]

    External Independent Review (EIR) Standard Operating Procedure (SOP) - September 2010 More Documents & Publications External Independent Review (EIR) Standard Operating Procedure...

  6. Pantex Falling Man - Independent Review Panel Report.

    SciTech Connect (OSTI)

    Bertolini, Louis; Brannon, Nathan; Olson, Jared; Price, Bernard; Wardle, Robert; Steinzig, Mike; Winfield, Michael

    2014-11-01

    Consolidated Nuclear Security (CNS) Pantex took the initiative to organize a Review Panel of subject matter experts to independently assess the adequacy of the Pantex Tripping Man Analysis methodology. The purpose of this report is to capture the details of the assessment including the scope, approach, results, and detailed Appendices. Along with the assessment of the analysis methodology, the panel evaluated the adequacy with which the methodology was applied as well as congruence with Department of Energy (DOE) standards 3009 and 3016. The approach included the review of relevant documentation, interactive discussion with Pantex staff, and the iterative process of evaluating critical lines of inquiry.

  7. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Environmental Management (EM)

    Independent Oversight Review, Los Alamos National Laboratory - January 2012 Independent Oversight Review, Los Alamos National Laboratory Chemistry and Metallurgy Research Facility ...

  8. External Independent Review (EIR) Standard Operating Procedure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    External Independent Review (EIR) Standard Operating Procedure (SOP) October 2008 External Independent Review (EIR) Standard Operating Procedure (SOP) October 2008 External ...

  9. Independent Oversight Review, Pantex Plant - February 2012 |...

    Office of Environmental Management (EM)

    Plant - February 2012 Independent Oversight Review, Pantex Plant - February 2012 February 2012 Review of the Pantex Plant Implementation Verification Review Processes This report ...

  10. Independent Oversight Review, Bonneville Power Administration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (Independent Oversight), within the Office of Health, Safety and Security, conduct an independent review of the Bonneville Power Administration (BPA) safety management program. ...

  11. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 2011 Independent Oversight Review, Los Alamos National Laboratory - September 2011 September 2011 Review of the Facility Centered Assessment of the Los Alamos National ...

  12. Independent Oversight Targeted Review, Sandia National Laboratories...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 2014 Independent Oversight Targeted Review, Sandia National Laboratories - April 2014 April 2014 Targeted Review of the Sandia National Laboratories Federal Assurance ...

  13. Independent Oversight Review of Integrated Safety Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... on LSO's most recent assessment of LLNL's contractor ... and the request for peer reviews and independent HSS reviews, show that LSO is a learning organization and that ...

  14. Independent Oversight Review, Nevada National Security - May...

    Office of Environmental Management (EM)

    National Security - May 2013 Independent Oversight Review, Nevada National Security - May 2013 May 2013 Review of the Nevada National Security Site Criticality Safety Program ...

  15. Independent Oversight Review, Sodium Bearing Waste Treatment...

    Office of Environmental Management (EM)

    This report documents the results of an independent review of the Sodium Bearing Waste Treatment Project-Integrated Waste Treatment Unit Federal Operational Readiness Review. ...

  16. Independent Oversight Review, DOE Headquarters Facilities - March...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review of the Headquarters Facilities Emergency Response Plans This report provides the results of an independent review of the emergency response plans for the Department of ...

  17. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review of the Consequence Assessment Program at the Los Alamos National Laboratory This report provides the results of an independent review of the Los Alamos National Laboratory ...

  18. Independent Oversight Review, Rocky Flats Environmental Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review of the Rocky Flats Environmental Technology Site Transportation Emergency Management Program This report provides the results of an independent review of the Transportation ...

  19. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review of the Emergency Response Organization at the Los Alamos National Laboratory This report provides the results of an independent review of the Los Alamos National Laboratory ...

  20. Independent Oversight Special Review, Bechtel Jacobs Company...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bechtel Jacobs Company, LLC - July 2011 Independent Oversight Special Review, Bechtel Jacobs Company, LLC - July 2011 July 2011 Special Review of the SuspectCounterfeit Items ...

  1. Independent Oversight Review, Advanced Mixed Waste Treatment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Advanced Mixed Waste Treatment Project - April 2013 Independent Oversight Review, Advanced Mixed Waste Treatment Project - April 2013 April 2013 Review of Radiation Protection...

  2. Independent Oversight Review, Richland Operations Office - November...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Richland Operations Office - November 2012 Independent Oversight Review, Richland Operations Office - November 2012 November 2012 Review of the Richland Operations Office Oversight...

  3. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Oversight Review, Waste Treatment and Immobilization Plant - March 2012 March 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant Project ...

  4. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant...

    Office of Environmental Management (EM)

    Plant - November 2013 Independent Oversight Review, Portsmouth Gaseous Diffusion Plant - November 2013 November 5, 2013 Review of Preparedness for Severe Natural Phenomena Events ...

  5. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    Independent Oversight Review, Waste Treatment and Immobilization Plant Project - October 2010 October 2010 Review of Nuclear Safety Culture at the Hanford Site Waste Treatment and ...

  6. Independent Oversight Review, Sodium Bearing Waste Treatment...

    Office of Environmental Management (EM)

    Independent Oversight Review, Sodium Bearing Waste Treatment Project - Contractor - June 2012 June 2012 Review of the Sodium Bearing Waste Treatment Project - Integrated Waste ...

  7. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    January 2013 Independent Oversight Review, Waste Treatment and Immobilization Plant - January 2013 January 2013 Review of the Hanford Waste Treatment and Immobilization Plant ...

  8. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    October 2012 Independent Oversight Review, Waste Treatment and Immobilization Plant - October 2012 October 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant ...

  9. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    May 2013 Independent Oversight Review, Waste Treatment and Immobilization Plant - May 2013 May 2013 Review of the Hanford Site Waste Treatment and Immobilization Plant Construction ...

  10. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    August 2012 Independent Oversight Review, Waste Treatment and Immobilization Plant - August 2012 August 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant ...

  11. Independent Oversight Review, Oak Ridge National Laboratory ...

    Energy Savers [EERE]

    National Laboratory - January 2013 Independent Oversight Review, Oak Ridge National Laboratory - January 2013 January 2013 Review of the Oak Ridge National Laboratory High Flux...

  12. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Environmental Management (EM)

    Laboratory Chemistry and Metallurgy Research Facility - January 2012 Independent Oversight Review, Los Alamos National Laboratory Chemistry and Metallurgy Research Facility - ...

  13. Independent Oversight Review, West Valley Demonstration Project...

    Office of Environmental Management (EM)

    West Valley Demonstration Project Transportation - September 2000 Independent Oversight Review, West Valley Demonstration Project Transportation - September 2000 September 2000 ...

  14. Independent Oversight Focused Program Review, Argonne National

    Office of Environmental Management (EM)

    Laboratory-West - May 2001 | Department of Energy Program Review, Argonne National Laboratory-West - May 2001 Independent Oversight Focused Program Review, Argonne National Laboratory-West - May 2001 May 2001 Focused Program Review at Argonne National Laboratory-West This report provides the results of an independent focused review of the Emergency Management Program at the Department of Energy's Argonne National Laboratory-West site that was conducted by the Office of Independent Oversight

  15. Independent Oversight Review, West Valley Demonstration Project

    Office of Environmental Management (EM)

    Transportation - September 2000 | Department of Energy West Valley Demonstration Project Transportation - September 2000 Independent Oversight Review, West Valley Demonstration Project Transportation - September 2000 September 2000 Transportation Emergency Management Review of the West Valley Demonstration Project (WVDP) and National Transportation Program (NTP)/Transportation Compliance Evaluation/Assistance Program (TCEAP) This report provides the results of an independent review of the

  16. External Independent Review (EIR) Standard Operating Procedure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Office of Project Management Oversight and Assessments (PMOA) performs External Independent Reviews (EIRs) to provide Project Management Executives (PMEs), senior leaders ...

  17. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Environmental Management (EM)

    The independent review was one part of a targeted assessment of fire protection at nuclear facilities across the DOE complex, including National Nuclear Security Administration ...

  18. Background Information for Independent Review Team. Lifecycle...

    Office of Scientific and Technical Information (OSTI)

    Background Information for Independent Review Team. Lifecycle Plan and FY14 Quarterly ... Visit OSTI to utilize additional information resources in energy science and technology. A ...

  19. Independent Oversight Special Review, Headquarters - August 2008...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Independent Oversight Special Review, Department of Energy sites - February 2008 Focus Group Meeting (Topical Meeting) 10 CFR 851 Worker Safety and ...

  20. External Independent Review (EIR) Standard Operating Procedure...

    Office of Environmental Management (EM)

    Standard Operating Procedure (SOP) May 2016 External Independent Review (EIR) Standard ... The objectives of this EIR Standard Operating Procedure (SOP) document are to clarify EIR ...

  1. Independent Oversight Review, Waste Treatment and Immobilization...

    Broader source: Energy.gov (indexed) [DOE]

    Hanford Site Waste Treatment and Immobilization Plant Project Construction Quality This report documents the results of an independent oversight review of selected aspects of...

  2. Independent Oversight Review, Waste Treatment and Immobilization...

    Broader source: Energy.gov (indexed) [DOE]

    Plant Construction Quality This report documents the results of an independent oversight review of Construction Quality at the Hanford Site Waste Treatment and Immobilization Plant ...

  3. Independent Oversight Review, Savannah River Operations Office...

    Office of Environmental Management (EM)

    - July 2013 July 2013 Review of the Employee Concerns Program at the Savannah River ... O 442.1, DEPARTMENT OF ENERGY EMPLOYEE CONCERNS PROGRAM Independent Activity ...

  4. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Health, Safety and Security (HSS), conducted an independent review of the Los Alamos National Laboratory (LANL) Weapons Engineering Tritium Facility (WETF) safety significant...

  5. External Independent Review (EIR) Standard Operating Procedure...

    Broader source: Energy.gov (indexed) [DOE]

    The objectives of this EIR Standard Operating Procedure (SOP) document are to clarify EIR ... PDF icon External Independent Review (EIR) Standard Operating Procedure (SOP), Revision 3, ...

  6. Independent Oversight Review, Richland Operations Office and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and work management and control processes in the areas of conduct of operations, quality assurance, and integrated safety management. Independent Oversight Review, Richland...

  7. Radiography Facility - Building 239 Independent Validation Review...

    Office of Scientific and Technical Information (OSTI)

    The purpose of this task was to perform an Independent Validation Review to evaluate the ... The review follows the outline developed for Milestone 1 of the PEP, which is based on the ...

  8. Independent Oversight Targeted Review, Sandia National Laboratories -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 2014 | Department of Energy April 2014 Independent Oversight Targeted Review, Sandia National Laboratories - April 2014 April 2014 Targeted Review of the Sandia National Laboratories Federal Assurance Capability The U.S. Department of Energy (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), conducted an independent review of the performance of the DOE Sandia Field Office safety oversight of the Sandia Corporation. The review was

  9. Independent Oversight Review, Bonneville Power Administration Safety

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Program - March 2014 | Department of Energy Bonneville Power Administration Safety Management Program - March 2014 Independent Oversight Review, Bonneville Power Administration Safety Management Program - March 2014 March 2014 Oversight Review of the Bonneville Power Administration Safety Management Program Bonneville Power Administration management requested that the U.S. Department of Energy Office of Enforcement and Oversight (Independent Oversight), within the Office of

  10. Independent Peer Review Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Peer Review Program Independent Peer Review Program 2014 PERT Charter.pdf (680.02 KB) More Documents & Publications Hydropower Vision Task Force Charter Procurement Evaluation & Re-Engineering Team (PERT) and Establishment of a 5-year Cycle with Corresponding Schedule Policy Guidance Memorandum #36 SES Competitive Staffing Procedures

  11. Independent Oversight Review, National Nuclear Security Administration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Production Office - February 2014 | Department of Energy National Nuclear Security Administration Production Office - February 2014 Independent Oversight Review, National Nuclear Security Administration Production Office - February 2014 February 2014 Review of the National Nuclear Security Administration Production Office Readiness Review Program The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security,

  12. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Environmental Management (EM)

    in Technical Area-55 that were conducted July 18 through August 19, 2011. The independent review was performed by the U.S. Department of Energy's (DOE) Office of Safety and ...

  13. Independent technical review of the Pinellas Plant

    SciTech Connect (OSTI)

    Not Available

    1994-07-01

    This report documents an Independent Technical Review (ITR) of facilities, organizations, plans, activities and various other elements required to successfully transition the Pinellas Plant from Defense Program (DP) funded operation to either community developed reuse or safe deactivation leading to decontamination and decommissioning (D&D). The review was conducted at the request of the Department of Energy (DOE) Deputy Assistant Secretary for Facility Transition and Management (EM-60) and is a consensus of the nine member ITR Team.

  14. Microsoft Word - HABAdv#228_Independent Review of BerylliumProgram...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HAB Consensus Advice 228 Subject: Independent Review of Beryllium Program Adopted: ... Box 450 (H6-60) Richland, WA 99352 Re: Independent Review of Beryllium Program Dear Ms. ...

  15. SCDAP/RELAP5 independent peer review

    SciTech Connect (OSTI)

    Corradini, M.L. . Dept. of Nuclear Engineering); Dhir, V.K. Santa Monica, CA ); Haste, T.J. ); Heames, T.J. ); Jenks, R.P. ); Kelly, J.E. (Sandia National Labs., Albuquerque, NM

    1993-01-01

    The SCDAP/RELAP5 code has been developed for best-estimate transient simulation of light-water-reactor coolant systems during severe accidents. The newest version of the code is SCDAP/RELAP5/MOD3. The US Nuclear Regulatory Commission (NRC) decided that there was a need for a broad technical review of the code by recognized experts to determine overall technical adequacy, even though the code is still under development. For this purpose, an eight-member SCDAP/RELAP5 Peer Review Committee was organized, and the outcome of the review should help the NRC prioritize future code-development activity. Because the code is designed to be mechanistic, the Committee used a higher standard for technical adequacy than was employed in the peer review of the parametric MELCOR code. The Committee completed its review of the SCDAP/RELAP5 code, and the findings are documented in this report. Based on these findings, recommendations in five areas are provided: (1) phenomenological models, (2) code-design objectives, (3) code-targeted applications, (4) other findings, and (5) additional recommendations.

  16. Independent technical review of the Mound Plant

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    This report documents an Independent Technical Review (ITR) of the facilities, organizations, plans, and activities required to transition particular elements of the Mound Plant from Defense Program (DP) funded operation as appropriate either to community developed reuse or safe deactivation leading to decontamination and decommissioning (D&D). The review was conducted at the request of the Dr. Willis Bixby, Deputy Assistant Secretary, U.S. Department of Energy EM-60, Office of Facility Transition and Management and is a consensus of the nine member ITR Team. Information for the review was drawn from documents provided to the ITR Team by the Miamisburg Area Office (MB) of the DOE, EG&G, the City of Miamisburg, and others; and from presentations, discussions, interviews, and facility inspections at the Mound Plant during the weeks of March 14 and March 28, 1994. During the week of April 25, 1994, the ITR Team met at Los Alamos, New Mexico to develop consensus recommendations. A presentation of the core recommendations was made at the Mound Plant on May 5, 1994. This is an independent assessment of information available to, and used by, the Mound Plant personnel. Repetition of the information is not meant to imply discovery by the ITR Team. Team members, however, acting as independent reviewers, frequently assess the information from a perspective that differs significantly from that of the Mound Plant personnel. The report is based on information obtained and conditions observed during the March 1994 review interval. The ITR process and normal site work often initiate rapid, beneficial changes in understanding and organization immediately following the review. These changes frequently alter conditions observed during the review, but the report does not address changes subsequent to the review interval.

  17. Report of the external expert peer review panel: DOE benefits forecasts

    SciTech Connect (OSTI)

    None, None

    2006-12-20

    A report for the FY 2007 GPRA methodology review, highlighting the views of an external expert peer review panel on DOE benefits forecasts.

  18. 2010 Solar Program Peer Review Report: An Independent Evaluation of Program Activities for FY2009 and FY2010

    SciTech Connect (OSTI)

    DOE Solar Energy Technologies Program

    2010-12-01

    This document summarizes the recommendations and evaluations provided by an independent external panel of experts at the DOE Solar Energy Technologies Program's 2010 Program Review meeting, held on May 24?27, 2010, in Washington, D.C.

  19. Independent Oversight Review, Savannah River Site Salt Waste...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security, conducted an independent review ...

  20. Independent Oversight Review, Hanford Site K-West Annex Facility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The U.S. Department of Energy Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security, conducted an independent review of ...

  1. Independent Oversight Review, Hanford Tank Farms - December 2012...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - December 2012 December 2012 Review of the Hanford Tank Farms Radiological Controls Activity-Level Implementation This report documents an independent review by the Office of...

  2. Independent Oversight Review, Hanford Site Waste Treatment and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste Treatment and Immobilization Plant, August 2013 Independent Oversight Review, Hanford Site Waste Treatment and Immobilization Plant, August 2013 August 2013 Review of the ...

  3. Independent Oversight Follow-up Review, Idaho Site - January...

    Office of Environmental Management (EM)

    Follow-up Review of Activity-Level Implementation of Radiation Controls and Radiological ... This report documents the results of an independent oversight review of radiation ...

  4. Independent Oversight Follow-up Review, Savannah River National...

    Office of Environmental Management (EM)

    Review, Los Alamos National Laboratory - December 2013 Independent Oversight Review, Los Alamos National Laboratory Chemistry and Metallurgy Research Facility - January 2012

  5. Independent Oversight Review, Hanford Waste Treatment and Immobilizati...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 2014 Independent Oversight Review, Hanford Waste Treatment and Immobilization Plant - March 2014 March 2014 Review of the Hanford Site Waste Treatment and Immobilization...

  6. Independent Oversight Review, Hanford Site CH2M Hill Plateau...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CH2M Hill Plateau Remediation Company - November 2012 Independent Oversight Review, Hanford Site CH2M Hill Plateau Remediation Company - November 2012 November 2012 Review of the...

  7. Independent Oversight Special Review, Rocky Flats Closure Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rocky Flats Closure Project Site - April 2001 Independent Oversight Special Review, Rocky Flats Closure Project Site - April 2001 April 2001 Special Review of the Rocky Flats...

  8. Independent Oversight Review, Hanford Site Waste Treatment and...

    Energy Savers [EERE]

    Waste Treatment and Immobilization Plant - June 2014 Independent Oversight Review, Hanford Site Waste Treatment and Immobilization Plant - June 2014 June 2014 Review of the Hanford ...

  9. Independent Oversight Review, Savannah River Site Salt Waste...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 2013 Independent Oversight Review, Savannah River Site Salt Waste Processing Facility - August 2013 August 2013 Review of the Savannah River Site Salt Waste Processing...

  10. Independent Oversight Review, Waste Isolation Pilot Plant - April...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 2013 Independent Oversight Review, Waste Isolation Pilot Plant - April 2013 April 2013 Review of the Waste Isolation Pilot Plant Work Planning and Control Activities The...

  11. Independent Oversight Targeted Review, Y-12 National Security...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Y-12 National Security Complex - February 2012 Independent Oversight Targeted Review, Y-12 National Security Complex - February 2012 February 2012 Targeted Review of Site...

  12. Independent Oversight Special Review, Department of Energy sites...

    Office of Environmental Management (EM)

    of Energy sites - February 2008 February 2008 Independent Oversight Special Review of Workplace Exposure Monitoring This report provides the results of a Special Review of...

  13. Independent Oversight Review, Waste Isolation Pilot Plant - November...

    Office of Environmental Management (EM)

    Independent Oversight Review, Waste Isolation Pilot Plant - November 2012 November 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Waste Isolation Pilot ...

  14. Independent Oversight Review, Los Alamos Site Office - March...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site Office - March 2012 Independent Oversight Review, Los Alamos Site Office - March 2012 March 2012 Review of the Los Alamos Site Office Safety System Oversight Program ...

  15. Independent Oversight Review, Y-12 National Security Complex - June 2012 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Y-12 National Security Complex - June 2012 Independent Oversight Review, Y-12 National Security Complex - June 2012 June 2012 Review of the Y-12 Implementation Verification Review Processes This report documents the results of an independent review of the implementation verification review (IVR) processes at the Department of Energy's (DOE) Y-12 National Security Complex. The review was conducted March 12-30, 2012, by the DOE Office of Safety and Emergency Management

  16. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant - April

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2013 | Department of Energy Portsmouth Gaseous Diffusion Plant - April 2013 Independent Oversight Review, Portsmouth Gaseous Diffusion Plant - April 2013 April 2013 Review of the Integrated Safety Management System Phase I Verification Review at the Portsmouth Gaseous Diffusion Plant The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the U.S. Department of Energy (DOE) Portsmouth/Paducah

  17. Independent Oversight Targeted Review, Sandia National Laboratories...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Targeted Review, Sandia National Laboratories - November 2013 December 2013 Targeted Review of Activity-Level Implementation of Radiological Controls at Sandia National ...

  18. Independent Oversight Review, National Nuclear Security Administration...

    Office of Environmental Management (EM)

    February 2014 Review of the National Nuclear Security Administration Production Office Readiness Review Program The U.S. Department of Energy (DOE) Office of Enforcement and ...

  19. Independent Oversight Review of the Lawrence Livermore National Laboratory

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - March 2001 | Department of Energy Review of the Lawrence Livermore National Laboratory - March 2001 Independent Oversight Review of the Lawrence Livermore National Laboratory - March 2001 March 2001 Review of the Lawrence Livermore National Laboratory Health Services Department This report provides the results of an independent oversight review of the Health Services Division at the Department of Energy's (DOE) Lawrence Livermore National Laboratory. The review was performed March 19-21,

  20. Independent Oversight Review, Hanford Site - July 2012 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy - July 2012 Independent Oversight Review, Hanford Site - July 2012 July 2012 Review of the Hanford Site Employee Concerns Programs TThis report provides the results of an independent oversight review of the Hanford Site Employee Concerns Programs. The review was performed April 30-May 4, 2012, by the U.S. Department of Energy's (DOE) Office of Safety and Emergency Management Evaluations, which is within the DOE Office of Health, Safety and Security. The overall purpose of this review

  1. Independent Oversight Review, Savannah River Site - September 2011 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy - September 2011 Independent Oversight Review, Savannah River Site - September 2011 September 2011 Review of the Implementation Verification Review Processes at the Savannah River Site Environmental Management Nuclear Facilities This report provides the results of an independent oversight review of the of the Implementation Verification Review (IVR) processes for the Environmental Management nuclear facilities at the Department of Energy's (DOE) Savannah River Site. The

  2. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant...

    Office of Environmental Management (EM)

    The contractor at PORTS is Fluor-Babcock & Wilcox Portsmouth (FBP). The HSS Office of Safety and Emergency Management Evaluations performed the onsite portion of the Independent ...

  3. Independent Oversight Review, Hanford Tank Farms - April 2013 | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Tank Farms - April 2013 Independent Oversight Review, Hanford Tank Farms - April 2013 April 2013 Review of Management of Safety Systems at the Hanford Tank Farms The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the management of safety class or safety significant structures, systems and components (hereinafter referred to as safety systems) at

  4. Independent Oversight Review, Lawrence Livermore National Laboratory - July

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2013 | Department of Energy Lawrence Livermore National Laboratory - July 2013 Independent Oversight Review, Lawrence Livermore National Laboratory - July 2013 July 2013 Review of Preparedness for Severe Natural Phenomena Events at the Lawrence Livermore National Laboratory The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the National Nuclear Security Administration (NNSA) Livermore

  5. Independent Oversight Review, Los Alamos National Laboratory - July 2014 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy July 2014 Independent Oversight Review, Los Alamos National Laboratory - July 2014 July 2014 Review of the Los Alamos National Laboratory Transuranic Waste Facility Safety Basis and Design Development The U.S. Department of Energy's (DOE) Office of Environment, Safety and Health Assessments, within the DOE Office of Independent Enterprise Assessments (formerly the Office of Health, Safety and Security), conducted an independent oversight review of the preliminary safety

  6. Independent Oversight Review, Paducah Site - April 2013 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Paducah Site - April 2013 Independent Oversight Review, Paducah Site - April 2013 April 2013 Review of Preparedness for Severe Natural Phenomena Events at the Paducah Site The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the U.S. Department of Energy (DOE) Paducah site's preparedness for severe natural phenomena events (NPEs). The HSS Office of Safety and Emergency Management

  7. Independent Oversight Review, Sandia Site Office - January 2013 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Sandia Site Office - January 2013 Independent Oversight Review, Sandia Site Office - January 2013 January 2013 Review of the Sandia Site Office Quality Assurance Assessment of the Manzano Nuclear Operations The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security, conducted an independent review of the U.S. Department of Energy (DOE) Sandia Site Office (SSO) quality assurance (QA) assessment of the Manzano nuclear

  8. Independent Oversight Review, Savannah River Site - January 2013 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy - January 2013 Independent Oversight Review, Savannah River Site - January 2013 January 2013 Review of the Savannah River Site, Waste Solidification Building, Construction Quality of Mechanical Systems Installation and Selected Aspects of Fire Protection System Design The Office of Enforcement and Oversight (Independent Oversight), within the U.S. Department of Energy (DOE) Office of Health, Safety and Security (HSS), conducted an independent review of construction

  9. Independent Oversight Review, Savannah River Site Salt Waste Processing

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Facility - April 2014 | Department of Energy Salt Waste Processing Facility - April 2014 Independent Oversight Review, Savannah River Site Salt Waste Processing Facility - April 2014 April 2014 Review of the Savannah River Site Salt Waste Processing Facility Construction Quality and Fire Protection Systems The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security, conducted an independent review of the

  10. Independent Oversight Review, Waste Isolation Pilot Plant - November 2012 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Isolation Pilot Plant - November 2012 Independent Oversight Review, Waste Isolation Pilot Plant - November 2012 November 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Waste Isolation Pilot Plant The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the U.S. Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) preparedness for severe

  11. Independent Oversight Review, Waste Treatment and Immobilization Plant -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January 2013 | Department of Energy January 2013 Independent Oversight Review, Waste Treatment and Immobilization Plant - January 2013 January 2013 Review of the Hanford Waste Treatment and Immobilization Plant Black-Cell and Hard-To-Reach Pipe Spools Procurement Process and the Office of River Protection Audit of That Process The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted a concurrent independent review with

  12. Independent Oversight Review, Waste Treatment and Immobilization Plant -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    May 2013 | Department of Energy May 2013 Independent Oversight Review, Waste Treatment and Immobilization Plant - May 2013 May 2013 Review of the Hanford Site Waste Treatment and Immobilization Plant Construction Quality The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight) within the Office of Health, Safety and Security (HSS) conducted an independent review of selected aspects of construction quality at the Hanford Site Waste Treatment and

  13. Independent Oversight Review of DOE Headquarters Emergency Response...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 26, 2003 The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted a review of emergency response plans and performance at DOE ...

  14. Distributed Hydrogen Production from Natural Gas: Independent Review

    SciTech Connect (OSTI)

    Fletcher, J.; Callaghan, V.

    2006-10-01

    Independent review report on the available information concerning the technologies needed for forecourts producing 150 kg/day of hydrogen from natural gas.

  15. Independent Oversight Review, Hanford Site Tank Farms 222-S Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the implementation of the electrical safety management program (SMP) at the ...

  16. Independent Oversight Review, Portsmouth/Paducah Project Office...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This report provides the results of an independent review of the Department of Energy's ... The independentreview was performed January 31 - February 2, 2012, by the DOE Office of ...

  17. Independent Oversight Review, Hanford K Basin and Cold Vacuum...

    Broader source: Energy.gov (indexed) [DOE]

    Hanford K Basin and Cold Vacuum Drying Facility Found Fuel Multi-Canister Overpack Operations This report provides the results of an independent oversight review of operations...

  18. Independent Oversight Review, Savannah River Site Tritium Facilities...

    Broader source: Energy.gov (indexed) [DOE]

    Facilities - June 2012 More Documents & Publications Technical Qualification Program Self-Assessment Report - Savannah River Site Office - 2011 Independent Oversight Review,...

  19. Independent Oversight Review, Los Alamos National Laboratory- December 2011

    Broader source: Energy.gov [DOE]

    Review of the Independent Integrated Safety Management/Integrated Work Management Assessment of Research and Development and Programmatic Work at the Los Alamos National Laboratory

  20. Distributed Hydrogen Production from Natural Gas: Independent Review Panel Report

    Broader source: Energy.gov [DOE]

    Independent review report on the available information concerning the technologies needed for forecourts producing 150 kg/day of hydrogen from natural gas.

  1. Independent Oversight Review, Idaho Site, March 2013 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site, March 2013 Independent Oversight Review, Idaho Site, March 2013 March 2013 Review of the Facility Representative Program at the Idaho Site The U.S. Department of Energy (DOE)...

  2. Independent Oversight Follow-up Review, Hanford Site - June 2011...

    Broader source: Energy.gov (indexed) [DOE]

    Follow-up Review of the Hanford Site Chronic Beryllium Disease Prevention Program This report provides the results of a follow-up independent oversight review of the Hanford Site...

  3. Independent Oversight Review, Portsmouth/Paducah Project Office - May 2012

    Energy Savers [EERE]

    - January 2012 | Department of Energy Savannah River National Laboratory - January 2012 Independent Oversight Follow-up Review, Savannah River National Laboratory - January 2012 January 2012 Follow-up Review of Implementation Verification Reviews at the Savannah River National Laboratory Savannah River Site This report provides the results of an independent review of the identification and implementation of safety basis hazard controls associated with "flashing spray release"

  4. Independent Oversight Follow-up Review, Savannah River National Laboratory

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - January 2012 | Department of Energy Savannah River National Laboratory - January 2012 Independent Oversight Follow-up Review, Savannah River National Laboratory - January 2012 January 2012 Follow-up Review of Implementation Verification Reviews at the Savannah River National Laboratory Savannah River Site This report provides the results of an independent review of the identification and implementation of safety basis hazard controls associated with "flashing spray release"

  5. Independent Oversight Review, Hanford Site Waste Treatment and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Immobilization Plant - June 2014 | Department of Energy Waste Treatment and Immobilization Plant - June 2014 Independent Oversight Review, Hanford Site Waste Treatment and Immobilization Plant - June 2014 June 2014 Review of the Hanford Site Waste Treatment and Immobilization Plant Construction Quality This report documents the results of an independent oversight review of selected aspects of construction quality at the Hanford Site Waste Treatment and Immobilization Plant. The review, which

  6. Independent Oversight Review, Idaho Site - November 2012 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Site - November 2012 Independent Oversight Review, Idaho Site - November 2012 November 2012 Review of Radiation Protection Program Implementation at the Idaho Site This report documents an independent review of radiation protection program implementation at the Idaho Site that was conducted by the U.S. Department of Energy's (DOE) Office of Safety and Emergency Management Evaluations, which is within the DOE Office of Health, Safety and Security (HSS). The review was performed

  7. Independent Oversight Review, Livermore Site Office - October 2011 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Livermore Site Office - October 2011 Independent Oversight Review, Livermore Site Office - October 2011 October 2011 Review of Integrated Safety Management System Effectiveness at the Livermore Site Office This report provides the results of an independent oversight review of the effectiveness of the integrated safety management system at the Department of Energy's (DOE) Livermore Site Office. The review was conducted July 11-21, 2011, by the Office of Safety and

  8. Independent Oversight Review, Nevada National Security Site, December 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy National Security Site, December 2013 Independent Oversight Review, Nevada National Security Site, December 2013 December 2013 Targeted Review of the Safety Significant Blast Door and Special Door Interlock Systems and Review of Federal Assurance Capability at the Nevada National Security Site This report documents the results of an independent oversight review of safety significant Blast Door Interlock and Special Door Interlock systems at the Nevada National Security

  9. Independent Oversight Review, Pantex Plant, December 2013 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Pantex Plant, December 2013 Independent Oversight Review, Pantex Plant, December 2013 December 2013 Targeted Review of the Safety Significant Blast Door and Personnel Door Interlock Systems and Review of Federal Assurance Capability at the Pantex Plant This report documents the results of an independent oversight review of safety significant Blast Door Interlock and personnel Door Interlock Systems at the Pantex Plant. The Pantex Plant is operated by Babcock & Wilcox Technical

  10. Independent Oversight Review, Savannah River Operations Office - July 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Operations Office - July 2013 Independent Oversight Review, Savannah River Operations Office - July 2013 July 2013 Review of the Employee Concerns Program at the Savannah River Operations Office The purpose of this Independent Oversight targeted review was to evaluate DOE-SR processes and their implementation for addressing safety concerns reported by DOE, contractor, and subcontractor employees at the Savannah River Site (SRS). This targeted review was performed at

  11. Independent Oversight Review, Waste Treatment and Immobilization Plant -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 2012 | Department of Energy August 2012 Independent Oversight Review, Waste Treatment and Immobilization Plant - August 2012 August 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant Construction Quality This report documents the results of an independent oversight review of Construction Quality at the Hanford Site Waste Treatment and Immobilization Plant (WTP). The review was performed February 6-10, 2012, and April 30 - May 4, 2012, by the U.S. Department of

  12. Independent Oversight Review, Waste Treatment and Immobilization Plant -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 2012 | Department of Energy March 2012 Independent Oversight Review, Waste Treatment and Immobilization Plant - March 2012 March 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant Project Construction Quality This report documents the results of an independent oversight review of Construction Quality at the Hanford Site Waste Treatment and Immobilization Plant (WTP). The review was performed November 14-17, 2011, by the U.S. Department of Energy's (DOE) Office of

  13. Independent Oversight Review, Waste Treatment and Immobilization Plant -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    October 2012 | Department of Energy October 2012 Independent Oversight Review, Waste Treatment and Immobilization Plant - October 2012 October 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant Construction Quality This report documents the results of an independent review of selected aspects of construction quality at the Department of Energy's (DOE) Hanford Site Waste Treatment and Immobilization Plant. The review was conducted August 6-10, 2012, by the DOE Office of

  14. Independent Oversight Special Review, Department of Energy sites - February

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2008 | Department of Energy Department of Energy sites - February 2008 Independent Oversight Special Review, Department of Energy sites - February 2008 February 2008 Independent Oversight Special Review of Workplace Exposure Monitoring This report provides the results of a Special Review of Construction Safety and Health Programs at Department of Energy (DOE) sites. This special review is based on data collected from late 2005 to early 2008 during scheduled inspections performed by the DOE

  15. Independent Oversight Special Review, Rocky Flats Closure Project Site -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 2001 | Department of Energy Rocky Flats Closure Project Site - April 2001 Independent Oversight Special Review, Rocky Flats Closure Project Site - April 2001 April 2001 Special Review of the Rocky Flats Closure Project Site This report provides the results of a Special Review at the Rocky Flats Closure Project that was performed U.S. Department of Energy's (DOE) Office of Independent Environment, Safety, and Health Oversight. The Special Review was conducted in February and March 2001

  16. Independent Oversight Review, Lawrence Livermore National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lawrence Livermore National Laboratory - September 2013 September 2013 Review of the Fire Protection Program at Lawrence Livermore National Laboratory This report documents the...

  17. Independent Oversight Review, Pacific Northwest National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pacific Northwest National Laboratory - September 2013 September 2013 Review of the Fire Protection Program at Pacific Northwest National Laboratory and the Fire Suppression...

  18. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    December 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant Low Activity Waste Melter Process System Hazards Analysis Activity The Office of Enforcement and...

  19. Independent Oversight Review, Babcock & Wilcox Technical Services...

    Broader source: Energy.gov (indexed) [DOE]

    July 2012 Review of the Long Lead Procurement Processed Used by Babcock & Wilcox Technical Services Y-12, LLC for the Uranium Processing Facility Project This report provides the ...

  20. Independent Oversight Review, Argonne National Laboratory - November...

    Broader source: Energy.gov (indexed) [DOE]

    Office of Health, Safety and Security. The review was carried out within the broader context of an ongoing program of assessments of the execution of implementation verification...

  1. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This report discusses the scope, background, methodology, results, and conclusions of the review, as well as opportunities for improvement and items identified for further ...

  2. Independent Oversight Review, Waste Treatment and Immobilization...

    Broader source: Energy.gov (indexed) [DOE]

    Review of the Hanford Site Waste Treatment and Immobilization Plant Construction Quality ... construction quality at the Hanford Site Waste Treatment and Immobilization Plant (WTP). ...

  3. Independent Oversight Review, Lawrence Livermore National Laboratory...

    Broader source: Energy.gov (indexed) [DOE]

    Review of Preparedness for Severe Natural Phenomena Events at the Lawrence Livermore ... Nuclear Security Administration (NNSA) Livermore Field Office (LFO) and Lawrence ...

  4. Independent Oversight Review, National Energy Technology Laboratory...

    Energy Savers [EERE]

    Review of the Emergency Management Program Technical Basis and Emergency Preparedness at the National Energy Technology Laboratory This report documents the results of an ...

  5. Independent Oversight Review, Idaho National Laboratory - July...

    Energy Savers [EERE]

    of Health, Safety and Security. The review evaluated the site's processes for identifying emergency response capabilities and maintaining them in a state of readiness in the event...

  6. Independent Oversight Review, Hanford Site - September 2013 ...

    Energy Savers [EERE]

    Management Evaluations performed this review to evaluate the processes for identifying emergency response capabilities and maintaining them in a state of readiness in case of a...

  7. Independent Peer Review Program | Department of Energy

    Energy Savers [EERE]

    Peer Review Program PDF icon 2014 PERT Charter.pdf More Documents & Publications Hydropower Vision Task Force Charter Policy Flash 2013-65 Procurement Evaluation &...

  8. Independent Oversight Review, Idaho Cleanup Project - August 2014 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Cleanup Project - August 2014 Independent Oversight Review, Idaho Cleanup Project - August 2014 August 2014 The U.S. Department of Energy?s (DOE) Office of Environment, Safety and Health Assessments, within the DOE Office of Independent Enterprise Assessments (IEA) (formerly the Office of Health, Safety and Security), conducted an independent oversight review of the Integrated Waste Treatment facility contractor readiness assessment (C-RA) at the Idaho Site from January

  9. Independent Oversight Review, Los Alamos National Laboratory - April 2012 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Los Alamos National Laboratory - April 2012 Independent Oversight Review, Los Alamos National Laboratory - April 2012 April 2012 Review of the Emergency Response Organization at the Los Alamos National Laboratory This report provides the results of an independent review of the Los Alamos National Laboratory emergency response organization program that was conducted February 7-9, 2012, by the Office of Safety and Emergency Management Evaluations within the Department of

  10. Independent Oversight Review, Los Alamos National Laboratory - September

    Office of Environmental Management (EM)

    Department of Energy May 2012 Independent Oversight Review, Los Alamos National Laboratory - May 2012 May 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Los Alamos National Laboratory his report provides the results of an independent review of the Los Alamos National Laboratory's preparedness for severe natural phenomena events that was conducted by the U.S. Department of Energy's Office of Health, Safety and Security (HSS) in March 2012. The HSS Office of Safety

  11. Independent Oversight Review, Los Alamos National Laboratory Chemistry and

    Office of Environmental Management (EM)

    Metallurgy Research Facility - January 2012 | Department of Energy Laboratory Chemistry and Metallurgy Research Facility - January 2012 Independent Oversight Review, Los Alamos National Laboratory Chemistry and Metallurgy Research Facility - January 2012 January 2012 Review of the Los Alamos National Laboratory Chemistry and Metallurgy Research Facility Fire Suppression Vital Safety System This report provides the results of an independent review of the Los Alamos National Laboratory's

  12. Independent Oversight Review, Los Alamos National Laboratory - April 2012 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy April 2012 Independent Oversight Review, Los Alamos National Laboratory - April 2012 April 2012 Review of the Consequence Assessment Program at the Los Alamos National Laboratory This report provides the results of an independent review of the Los Alamos National Laboratory emergency management consequence assessment program that was conducted February 7-9, 2012, by the Office of Safety and Emergency Management Evaluations within the Department of Energy's (DOE) Office

  13. Independent Oversight Review, Los Alamos National Laboratory - December

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2013 | Department of Energy December 2013 Independent Oversight Review, Los Alamos National Laboratory - December 2013 December 2013 Review of the Technical Area 55 Safety Class Fire Suppression System at Los Alamos National Laboratory This report documents the results of an independent oversight review of the Los Alamos National Laboratory (LANL) Technical Area 55 Plutonium Facility safety class fire suppression system (FSS), concurrent with a scheduled Los Alamos Field Office vital safety

  14. Independent Oversight Review, Los Alamos National Laboratory - January 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy January 2013 Independent Oversight Review, Los Alamos National Laboratory - January 2013 January 2013 Review of the Los Alamos National Laboratory Corrective Action Effectiveness Review The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), evaluated the Los Alamos Site Office (LASO) safety system oversight (SSO) assessment of Los Alamos National Laboratory's (LANL) corrective actions to address prior

  15. Independent Oversight Review, Los Alamos National Laboratory - May 2012 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy May 2012 Independent Oversight Review, Los Alamos National Laboratory - May 2012 May 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Los Alamos National Laboratory his report provides the results of an independent review of the Los Alamos National Laboratory's preparedness for severe natural phenomena events that was conducted by the U.S. Department of Energy's Office of Health, Safety and Security (HSS) in March 2012. The HSS Office of Safety

  16. Independent Oversight Review, Nevada Site Office - October 2011 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Site Office - October 2011 Independent Oversight Review, Nevada Site Office - October 2011 October 2011 Review of Nevada Site Office Criticality Safety Assessments at the Criticality Experiments Facility and Training Assembly for Criticality Safety and Appraisal of the Criticality Experiments Facility Startup Plan This report provides the results of an independent oversight review of criticality safety assessment activities conducted by the Department of Energy's (DOE)

  17. Independent Oversight Review, Oak Ridge Transuranic Waste Processing

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Center, September 2013 | Department of Energy Oak Ridge Transuranic Waste Processing Center, September 2013 Independent Oversight Review, Oak Ridge Transuranic Waste Processing Center, September 2013 September 2013 Review of Management of Safety Systems at the Oak Ridge Transuranic Waste Processing Center and Associated Feedback and Improvement Processes. This report documents the results of an independent oversight review of the management of safety significant structures, systems, and

  18. Independent Oversight Review, Rocky Flats Environmental Technology Site -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 2000 | Department of Energy Rocky Flats Environmental Technology Site - March 2000 Independent Oversight Review, Rocky Flats Environmental Technology Site - March 2000 March 2000 Review of the Rocky Flats Environmental Technology Site Transportation Emergency Management Program This report provides the results of an independent review of the Transportation Emergency Management Program at the Department of Energy's Rocky Flats Environmental Technology Site that was conducted by the

  19. Independent Oversight Review, Waste Treatment and Immobilization Plant

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project - October 2010 | Department of Energy Project - October 2010 Independent Oversight Review, Waste Treatment and Immobilization Plant Project - October 2010 October 2010 Review of Nuclear Safety Culture at the Hanford Site Waste Treatment and Immobilization Plant Project The U.S. Department of Energy (DOE) Office of Health, Safety and Security (HSS) conducted an independent review of the nuclear safety culture at the Waste Treatment and Immobilization Plant (WTP) project at the Hanford

  20. Independent Oversight Review, Los Alamos Field Office - March 2014 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Field Office - March 2014 Independent Oversight Review, Los Alamos Field Office - March 2014 March 2014 Review of the Los Alamos Field Office Processes for Laboratory Oversight of Radiological Controls Activity-Level Implementation This report documents the results of an independent oversight review of National Nuclear Security Administration Los Alamos Field Office processes for laboratory oversight of radiological protection program activity-level implementation by Los

  1. Independent Oversight Review, Los Alamos National Laboratory - November

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2013 | Department of Energy National Laboratory - November 2013 Independent Oversight Review, Los Alamos National Laboratory - November 2013 November 2013 Review of the Los Alamos National Laboratory Radiological Controls Activity-Level Implementation This report documents the results of an independent oversight review of radiological protection program activity-level implementation performed by Los Alamos National Security and its subcontractors at Los Alamos National Laboratory, Los Alamos

  2. Joint Integration Office Independent Review Committee annual report, 1985

    SciTech Connect (OSTI)

    Not Available

    1986-08-01

    Comprised of seven persons with extensive experience in the issues of nuclear waste, the Independent Review Committee (IRC) provides independent and objective review of Defense Transuranic Waste Program (DTWP) activities managed by the Joint Integration Office (JIO), formerly the Defense Transuranic Waste Lead Organization (TLO). The Committee is ensured a broad, interdisciplinary perspective since its membership includes representatives from the fields of nuclear engineering, nuclear waste transportation, industrial quality control, systems and environmental engineering and state and local government. The scope of IRC activities includes overall review of specific TLO plans, projects and activities, and technical review of particular research and development projects. The Committee makes specific suggestions and recommendations based upon expertise in the field of TRU Waste Management. The IRC operates as a consulting group, under an independent charter providing objective review of program activities. This report summarizes the 12 major topics reviewed by the committee during 1985.

  3. Hydrogen Production Cost Estimate Using Biomass Gasification: Independent Review

    Office of Energy Efficiency and Renewable Energy (EERE)

    This independent review report assesses the 2009 state-of-the-art and 2020 projected capital cost, energy efficiency, and levelized cost for hydrogen production from biomass via gasification.

  4. Waste Treatment Plant External Independent Review, Office of...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 28, 2016 8:00AM EDT to April 1, 2016 5:00PM EDT External Independent Review (EIR). On March 28 - April 1, the Office of Project Management Oversight and Assessments (PM) will ...

  5. The independent review group`s comments on the MPC

    SciTech Connect (OSTI)

    Vincent, J.A.

    1994-10-01

    This article presents comments from the Group (IRG) who independently reviewed the multipurpose canister system (MCS) Conceptual Design Report. The IRG determined that its efforts would be best directed toward providing the DOE with recommendations concerning the MPC system design and development. Comments also focused on applying lessons learned during the CSDP review to the MPC design and procurement. Topics highlighted are the programmatic review and the MPC design review.

  6. External Independent Review (EIR) Scoping Meeting Agreement Form |

    Energy Savers [EERE]

    Department of Energy Scoping Meeting Agreement Form External Independent Review (EIR) Scoping Meeting Agreement Form Under DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, the Office of Acquisition and Project Management (OAPM) must perform a Performance Baseline External Independent Review (EIR) prior to Critical Decision (CD) 2, and a Construction/Execution Readiness EIR for all Major System projects prior to CD-3. The EIR Standard Operating Procedures

  7. External Independent Review (EIR) Standard Operating Procedure (SOP) May

    Energy Savers [EERE]

    2016 | Department of Energy Standard Operating Procedure (SOP) May 2016 External Independent Review (EIR) Standard Operating Procedure (SOP) May 2016 The Office of Project Management Oversight and Assessments (PM) performs External Independent Reviews (EIRs) to provide Project Management Executives (PMEs), senior leaders within the Department of Energy (DOE), and Congress an unbiased assessment of whether a capital asset project can be executed within proposed scope, schedule and cost

  8. Independent Oversight Focused Review, Kansas City Plant, Summary Report -

    Energy Savers [EERE]

    Department of Energy Savannah River Remediation - July 2010 Independent Activity Report, Savannah River Remediation - July 2010 July 2010 Savannah River Operations Office Integrated Safety Management System Phase II Verification Review of Savannah River Remediation The U.S. Department of Energy (DOE), Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), participated in the DOE Savannah River Operations Office (DOE-SR), Office of Safety and Quality

  9. Independent Oversight Special Review, Bechtel Jacobs Company, LLC - July

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2011 | Department of Energy Bechtel Jacobs Company, LLC - July 2011 Independent Oversight Special Review, Bechtel Jacobs Company, LLC - July 2011 July 2011 Special Review of the Suspect/Counterfeit Items Program at the Bechtel Jacobs Company, LLC at the Oak Ridge Reservation This report provides the results of a special review of the of the Bechtel Jacobs Company, LLC (BJC) suspect/counterfeit items (S/CI) management system. This review was requested by the Manager of the U.S. Department of

  10. Hydrogen Production Cost Estimate Using Biomass Gasification: Independent Review

    SciTech Connect (OSTI)

    none,

    2011-10-01

    This independent review is the conclusion arrived at from data collection, document reviews, interviews and deliberation from December 2010 through April 2011 and the technical potential of Hydrogen Production Cost Estimate Using Biomass Gasification. The Panel reviewed the current H2A case (Version 2.12, Case 01D) for hydrogen production via biomass gasification and identified four principal components of hydrogen levelized cost: CapEx; feedstock costs; project financing structure; efficiency/hydrogen yield. The panel reexamined the assumptions around these components and arrived at new estimates and approaches that better reflect the current technology and business environments.

  11. Independent Oversight Review, Pantex Site Office - June 2012 | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Site Office - June 2012 Independent Oversight Review, Pantex Site Office - June 2012 June 2012 Review of the Pantex Site Office's Compliance with DOE Order 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities eview of the Pantex Site Office's (PXSO) compliance with DOE Order 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities. The review was performed onsite from April 2 to 5 and off site through April 24, 2012, by the U.S. Department

  12. External Independent Review (EIR) Standard Operating Procedure (SOP) October 2015

    Broader source: Energy.gov [DOE]

    The Office of Project Management Oversight and Assessments (PMOA) performs External Independent Reviews (EIRs) to provide Project Management Executives (PMEs), senior leaders within the Department of Energy (DOE), and Congress with an unbiased assessment of whether a capital asset project can be executed within proposed scope, schedule and cost commitments, while also meeting its key performance parameters and ultimately fulfilling its associated mission need. The objectives of this EIR Standard Operating Procedures (SOP) document are to clarify EIR expectations and to facilitate EIR planning and execution by PMOA, its support contractors, DOE Program offices and project teams.

  13. External Independent Review (EIR) Standard Operating Procedure (SOP) April 2016

    Broader source: Energy.gov [DOE]

    The Office of Project Management Oversight and Assessments (PM) performs External Independent Reviews (EIRs) to provide Project Management Executives (PMEs), senior leaders within the Department of Energy (DOE), and Congress an unbiased assessment of whether a capital asset project can be executed within proposed scope, schedule and cost commitments, while also meeting its key performance parameters and fulfilling its associated mission need. The objectives of this EIR Standard Operating Procedure (SOP) document are to clarify EIR expectations and to facilitate EIR planning and execution by PM, its support contractors, DOE Program offices and project teams.

  14. Hydrogen Production Cost Estimate Using Biomass Gasification: Independent Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydrogen Production Cost Estimate Using Biomass Gasification National Renewable Energy Laboratory 1617 Cole Boulevard * Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Contract No. DE-AC36-08GO28308 Independent Review Published for the U.S. Department of Energy Hydrogen and Fuel Cells Program NREL/BK-6A10-51726 October

  15. Independent Review of Tank 241-AY-101 Fitness for Service

    SciTech Connect (OSTI)

    Stewart, Charles W.; Bush, Spencer H.; Delegard, Calvin H.; Elmore, Monte R.; Johnson, A. Burton; Pardini, Allan F.; Posakony, Gerald J.; Simonen, Fredric A.; Terry, Michael T.; Zapp, Philip E.

    2003-02-28

    Video inspections in the annulus of Hanford double-shell waste storage tank 241-AY-101 in 2001 and earlier showed rust over large areas of the primary and secondary tank walls. These observations led to extensive on-destructive inspections and analyses to determine the extent and severity of the corrosion and correction of several operational deficiencies that contributed to the problem. PNNL has performed an independent review of the accumulated evidence from these efforts to determine whether unacceptable conditions were corrected and the current condition of the tank meets or exceeds technical and operational requirements. The findings of this review are the subject of this report. The conclusion is that AY-101 is fit for service without restriction subject to several recommendations for further inspections and analyses.

  16. Independent Oversight Targeted Review of the Sandia National...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... representatives (FRs) and subject matter experts (SMEs), were observed whenever possible. ... assurance system (CAS) and operational awareness activities (OAAs) by SFO FRs and SMEs. ...

  17. Independent Review of Simulation of Net Infiltration for Present-Day and Potential Future Climates

    SciTech Connect (OSTI)

    Review Panel: Soroosh Sorooshian, Ph.D., Panel Chairperson, University of California, Irvine; Jan M. H. Hendrickx, Ph.D., New Mexico Institute of Mining and Technology; Binayak P. Mohanty, Ph.D., Texas A&M University; Scott W. Tyler, Ph.D., University of Nevada, Reno; Tian-Chyi Jim Yeh, Ph.D., University of Arizona -- ORISE Review Facilitators: Robert S. Turner, Ph.D., Technical Review Group Manager, Oak Ridge Institute for Science and Education; Brian R. Herndon, Project Manager, Oak Ridge Institute for Science and Education; Russ Manning, Technical Writer /Editor, Haselwood Enterprises, Inc.

    2008-08-30

    The DOE Office of Civilian Radioactive Waste Management (OCRWM) tasked Oak Ridge Institute for Science and Education (ORISE) with providing an independent expert review of the documented model and prediction results for net infiltration of water into the unsaturated zone at Yucca Mountain. The specific purpose of the model, as documented in the report MDL-NBS-HS-000023, Rev. 01, is “to provide a spatial representation, including epistemic and aleatory uncertainty, of the predicted mean annual net infiltration at the Yucca Mountain site ...” (p. 1-1) The expert review panel assembled by ORISE concluded that the model report does not provide a technically credible spatial representation of net infiltration at Yucca Mountain. Specifically, the ORISE Review Panel found that: • A critical lack of site-specific meteorological, surface, and subsurface information prevents verification of (i) the net infiltration estimates, (ii) the uncertainty estimates of parameters caused by their spatial variability, and (iii) the assumptions used by the modelers (ranges and distributions) for the characterization of parameters. The paucity of site-specific data used by the modeling team for model implementation and validation is a major deficiency in this effort. • The model does not incorporate at least one potentially important hydrologic process. Subsurface lateral flow is not accounted for by the model, and the assumption that the effect of subsurface lateral flow is negligible is not adequately justified. This issue is especially critical for the wetter climate periods. This omission may be one reason the model results appear to underestimate net infiltration beneath wash environments and therefore imprecisely represent the spatial variability of net infiltration. • While the model uses assumptions consistently, such as uniform soil depths and a constant vegetation rooting depth, such assumptions may not be appropriate for this net infiltration simulation because they

  18. 2008-10 "Independent Review of the MDA G CME Report by DOE Office...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 "Independent Review of the MDA G CME Report by DOE Office of Groundwater and Soil Remediation" 2008-10 "Independent Review of the MDA G CME Report by DOE Office of Groundwater and ...

  19. Current (2009) State-of-the-Art Hydrogen Production Cost Estimate Using Water Electrolysis: Independent Review

    SciTech Connect (OSTI)

    Not Available

    2009-09-01

    This independent review examines DOE cost targets for state-of-the art hydrogen production using water electrolysis.

  20. Measurement of Hydrogen Production Rate Based on Dew Point Temperatures: Independent Review

    SciTech Connect (OSTI)

    Duffy, M.; Harrison, K.; Sheahen, T.

    2007-11-01

    This independent review verified Idaho National Labotory's approach of measuring the rate of hydrogen production using dew point temperatures.

  1. Expert systems and the CPI product substitution review: A needs analysis for the US Bureau of Labor Statistics

    SciTech Connect (OSTI)

    Arrowood, L.F.; Tonn, B.E.

    1992-02-01

    This report presents recommendations relative to the use of expert systems and machine learning techniques by the Bureau of Labor Statistics (BLS) to substantially automate product substitution decisions associated with the Consumer Price Index (CPI). Thirteen commercially available, PC-based expert system shells have received in-depth evaluations. Various machine learning techniques were also reviewed. Two recommendations are given: (1) BLS should use the expert system shell LEVEL5 OBJECT and establish a software development methodology for expert systems; and (2) BLS should undertake a small study to evaluate the potential of machine learning techniques to create and maintain the approximately 350 ELI-specific knowledge bases to be used in CPI product substitution review.

  2. Independent Oversight Review, Oak Ridge National Laboratory- January 2013

    Broader source: Energy.gov [DOE]

    Review of the Oak Ridge National Laboratory High Flux Isotope Reactor Implementation Verification Review Processes

  3. Independent Oversight Review, Los Alamos National Laboratory- July 2012

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of the Los Alamos National Laboratory Implementation Verification Review at Technical Area-55

  4. Independent Oversight Review, DOE Nuclear Facilities- May 2013

    Broader source: Energy.gov [DOE]

    Lessons Learned from Targeted Reviews of Implementation Verification Review Processes at Department of Energy Nuclear Facilities

  5. Independent engineering review of the Hanford Waste Vitrification System

    SciTech Connect (OSTI)

    Not Available

    1991-10-01

    The Hanford Waste Vitrification Plant (HWVP) was initiated in June 1987. The HWVP is an essential element of the plan to end present interim storage practices for defense wastes and to provide for permanent disposal. The project start was justified, in part, on efficient technology and design information transfer from the prototype Defense Waste Processing Facility (DWPF). Development of other serial Hanford Waste Vitrification System (HWVS) elements, such as the waste retrieval system for the double-shell tanks (DSTs), and the pretreatment system to reduce the waste volume converted into glass, also was required to accomplish permanent waste disposal. In July 1991, at the time of this review, the HWVP was in the Title 2 design phase. The objective of this technical assessment is to determine whether the status of the technology development and engineering practice is sufficient to provide reasonable assurance that the HWVP and the balance of the HWVS system will operate in an efficient and cost-effective manner. The criteria used to facilitate a judgment of potential successful operation are: vitrification of high-level radioactive waste from specified DSTs on a reasonably continuous basis; and glass produced with physical and chemical properties formally acknowledge as being acceptable for disposal in a repository for high-level radioactive waste. The criteria were proposed specifically for the Independent Engineering Review to focus that assessment effort. They are not represented as the criteria by which the Department will judge the prudence of the Project. 78 refs., 10 figs., 12 tabs.

  6. Independent Oversight Review, Argonne National Laboratory- November 2011

    Broader source: Energy.gov [DOE]

    Review of the Argonne National Laboratory Alpha-Gamma Hot Cell Facility Readiness Assessment (Implementation Verification Review Sections)

  7. Independent Oversight Review, Plutonium Finishing Plant- July 2014

    Office of Energy Efficiency and Renewable Energy (EERE)

    Targeted Review of the Safety Significant Confinement Ventilation System and Review of Federal Assurance Capability at the Plutonium Finishing Plant

  8. IMG ER: A System for Microbial Genome Annotation Expert Review and Curation

    SciTech Connect (OSTI)

    Markowitz, Victor M.; Mavromatis, Konstantinos; Ivanova, Natalia N.; Chen, I-Min A.; Chu, Ken; Kyrpides, Nikos C.

    2009-05-25

    A rapidly increasing number of microbial genomes are sequenced by organizations worldwide and are eventually included into various public genome data resources. The quality of the annotations depends largely on the original dataset providers, with erroneous or incomplete annotations often carried over into the public resources and difficult to correct. We have developed an Expert Review (ER) version of the Integrated Microbial Genomes (IMG) system, with the goal of supporting systematic and efficient revision of microbial genome annotations. IMG ER provides tools for the review and curation of annotations of both new and publicly available microbial genomes within IMG's rich integrated genome framework. New genome datasets are included into IMG ER prior to their public release either with their native annotations or with annotations generated by IMG ER's annotation pipeline. IMG ER tools allow addressing annotation problems detected with IMG's comparative analysis tools, such as genes missed by gene prediction pipelines or genes without an associated function. Over the past year, IMG ER was used for improving the annotations of about 150 microbial genomes.

  9. Independent Oversight Review, Hanford Waste Treatment and Immobilizati...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The scope of this quarterly assessment of construction quality review included observations of ongoing work activities, review of the Bechtel National, Inc. (BNI) corrective action ...

  10. Independent Oversight Review of Department of Energy Contractor...

    Broader source: Energy.gov (indexed) [DOE]

    The Department of Energy (DOE) Office of Oversight performed a two-phased review of eight Departmental contractor occupational medicine programs. The first phase of the review was ...

  11. Independent Oversight Review, Hanford Site CH2M Hill Plateau Remediation

    Office of Environmental Management (EM)

    Management Program - March 2014 | Department of Energy Review, Bonneville Power Administration Safety Management Program - March 2014 Independent Oversight Review, Bonneville Power Administration Safety Management Program - March 2014 March 2014 Oversight Review of the Bonneville Power Administration Safety Management Program Bonneville Power Administration management requested that the U.S. Department of Energy Office of Enforcement and Oversight (Independent Oversight), within the Office

  12. Independent Oversight Review, Savannah River Site Tritium Facilities...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independentreview of preparedness for severe ...

  13. Independent Oversight Follow-up Review of Activity Level Implementatio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Although the computer station is located within the posted contamination area, this is a ... were jointly witnessed by Independent Oversight and a DOE-ID MFC Facility Representative. ...

  14. Independent Oversight Activity Report for Review of Corrective...

    Office of Environmental Management (EM)

    of radiological posting and labeling, proper personal protective equipment doffing and contamination control, and response to abnormal operations. Result: Independent Oversight...

  15. Independent Oversight Review, Lawrence Livermore National Laboratory- August 2014

    Broader source: Energy.gov [DOE]

    Review of the Lawrence Livermore National Laboratory Radiological Controls Activity-Level Implementation.

  16. Independent Oversight Review, Idaho National Laboratory- September 2011

    Broader source: Energy.gov [DOE]

    Review of the Occupational Radiation Program as Implemented and Recently Enhanced at the Idaho National Laboratory

  17. Independent Oversight Review, Los Alamos National Laboratory- January 2012

    Broader source: Energy.gov [DOE]

    Review of the Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility Fire Suppression System

  18. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant – November 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of Preparedness for Severe Natural Phenomena Events at the Portsmouth Gaseous Diffusion Plant.

  19. Independent Specific Administrative Controls Review, Richland Operations Office- December 2010

    Broader source: Energy.gov [DOE]

    Specific Administrative Controls Review with the Office of Environmental Management at DOE-Richland Operations Office

  20. Independent Oversight Review, Hanford Tank Farms- November 2011

    Broader source: Energy.gov [DOE]

    Review of Hanford Tank Farms Safety Basis Amendment for Double-Shell Tank Ventilation System Upgrades

  1. Independent Oversight Review, Department of Energy Contractor- August 2000

    Broader source: Energy.gov [DOE]

    Review of Department of Energy Contractor Occupational Medicine Programs from December 1998 to June 1999

  2. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant- January 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of the Portsmouth Gaseous Diffusion Plant Work Planning and Control Activities Prior to Work Execution

  3. Independent Oversight Review, Lawrence Livermore National Laboratory- September 2011

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of Integrated Safety Management System Effectiveness at Lawrence Livermore National Laboratory

  4. Independent Oversight Review, Savannah River Site- September 2012

    Broader source: Energy.gov [DOE]

    Review of the Savannah River Site, Salt Waste Processing Facility, Construction Quality of Piping & Pipe Supports

  5. Independent Oversight Review, Savannah River Site Tritium Facilities- December 2012

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of Site Preparedness for Severe Natural Phenomena Events at the Savannah River Site Tritium Facilities

  6. Independent Oversight Targeted Review, Sandia National Laboratories – November 2013

    Broader source: Energy.gov [DOE]

    Targeted Review of Activity-Level Implementation of Radiological Controls at Sandia National Laboratories

  7. Independent Oversight Review, Hanford Site K-West Annex Facility - April

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2014 | Department of Energy K-West Annex Facility - April 2014 Independent Oversight Review, Hanford Site K-West Annex Facility - April 2014 April 2014 Review of the Hanford Site K-West Annex Facility Construction Quality The U.S. Department of Energy Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security, conducted an independent review of selected aspects of construction quality at the K-West Annex Facility. The onsite portion of the

  8. Independent Oversight Review, URS CH2M Oak Ridge - June 2013...

    Broader source: Energy.gov (indexed) [DOE]

    Oak Ridge Environmental Management Radiological Controls Activity Level Implementation The purpose of this set of facility specific Independent Oversight targeted reviews is to...

  9. Independent Oversight Focused Review, Kansas City Plant, Summary...

    Broader source: Energy.gov (indexed) [DOE]

    1 Focused Review of Environment, Safety and Health and Emergency Management at the Kansas City Plant This report provides a summary of the results of a focused review of the...

  10. Independent Oversight Review, Oak Ridge Office- August 2011

    Broader source: Energy.gov [DOE]

    Review of the Oak Ridge Office Oversight of the Fire Protection Program at the Oak Ridge Reservation

  11. Independent Oversight Review, Savannah River Site- August 2011

    Broader source: Energy.gov [DOE]

    Review of Commercial Grade Dedication Plans for the Safety Instrumented System at the Savannah River Site Waste Solidification Building Project

  12. Independent Oversight Review, Advanced Mixed Waste Treatment Project- April 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of Radiation Protection Program Implementation at the Advanced Mixed Waste Treatment Project of the Idaho Site

  13. Independent Oversight Review, Savannah River Site- July 2011

    Broader source: Energy.gov [DOE]

    Review of Electrical System Configuration Management and Design Change Control at the Savannah River Site, Waste Solidification Building Project

  14. Independent Oversight Review, National Energy Technology Laboratory – May 2014

    Broader source: Energy.gov [DOE]

    Review of the Emergency Management Program Technical Basis and Emergency Preparedness at the National Energy Technology Laboratory

  15. Independent Oversight Review, Los Alamos National Laboratory- January 2013

    Broader source: Energy.gov [DOE]

    Review of the Los Alamos National Laboratory Weapons Engineering Tritium Facility Tritium Gas Containment Vital Safety System

  16. Independent Oversight Review, Waste Treatment and Immobilization Plant- December 2012

    Broader source: Energy.gov [DOE]

    Review of the Hanford Site Waste Treatment and Immobilization Plant Low Activity Waste Melter Process System Hazards Analysis Activity

  17. INDEPENDENT REVIEW OF THE X-701B GROUNDWATER REMEDY, PORTSMOUTH, OHIO: TECHNICAL EVALUATION AND RECOMMENDATIONS

    SciTech Connect (OSTI)

    Looney, B.; Eddy-Dilek, C.; Costanza, J.; Rossabi, J.; Early, T.; Skubal, K.; Magnuson, C.

    2008-12-15

    The Department of Energy Portsmouth Paducah Project Office requested assistance from Department of Energy Office of Environmental Management (EM-22) to provide independent technical experts to evaluate past and ongoing remedial activities at the Portsmouth facility that were completed to address TCE contamination associated with the X-701B groundwater plume and to make recommendations for future efforts. The Independent Technical Review team was provided with a detailed and specific charter. The charter requested that the technical team first review the past and current activities completed for the X-701B groundwater remedy for trichloroethene (TCE) in accordance with a Decision Document that was issued by Ohio EPA on December 8, 2003 and a Work Plan that was approved by Ohio EPA on September 22, 2006. The remedy for X-701B divides the activities into four phases: Phase I - Initial Source Area Treatment, Phase II - Expanded Source Area Treatment, Phase III - Evaluation and Reporting, and Phase IV - Downgradient Remediation and Confirmation of Source Area Treatment. Phase I of the remedy was completed during FY2006, and DOE has now completed six oxidant injection events within Phase II. The Independent Technical Review team was asked to evaluate Phase II activities, including soil and groundwater results, and to determine whether or not the criteria that were defined in the Work Plan for the Phase II end point had been met. The following criteria are defined in the Work Plan as an acceptable Phase II end point: (1) Groundwater samples from the identified source area monitoring wells have concentrations below the Preliminary Remediation Goal (PRG) for TCE in groundwater, or (2) The remedy is no longer effective in removing TCE mass from the source area. In addition, the charter specifies that if the Review Team determines that the Phase II endpoint has not been reached, then the team should address the following issues: (1) If additional injection events are

  18. Independent Oversight Review, Y-12 National Security Complex...

    Office of Environmental Management (EM)

    - March 2014 March 2014 Review of the Uranium Processing Facility Project Design ... and configuration management program at the Uranium Processing Facility (UPF) project. ...

  19. Independent Oversight Review, Oak Ridge Transuranic Waste Processing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ridge Transuranic Waste Processing Facility - December 2013 December 2013 Review of the Fire Protection Program and Fire Protection Systems at the Transuranic Waste Processing...

  20. Independent Oversight Review, Savannah River Site- June 2012

    Broader source: Energy.gov [DOE]

    Review of Electrical System Configuration Management, Safety Instrumented System Commercial Grade Dedication, Setpoint Calculations, and Software Testing at the Savannah River Site, Waste Solidification Building Project

  1. Independent Oversight Review of the Uranium Processing Facilkity...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A-1 Appendix B: Key Documents Reviewed, Interviews, and Observations ...... B-1 ii Acronyms B&W Y-12 Babcock & Wilcox Technical Services ...

  2. Independent Oversight Targeted Review, Oak Ridge National Laboratory- April 2014

    Broader source: Energy.gov [DOE]

    Targeted Review of Radiological Controls Activity-Level Implementation at the Oak Ridge National Laboratory Radiochemical Engineering Development Center and High Flux Isotope Reactor Facilities

  3. Independent Oversight Review, DOE/NNSA Nuclear Facilities- April 2013

    Broader source: Energy.gov [DOE]

    Lessons Learned from the 2012 Targeted Reviews of Emergency Preparedness for Severe Natural Phenomena Events at Select DOE/NNSA Nuclear Facilities

  4. Independent Oversight Review, Pacific Northwest National Laboratory- October 2012

    Broader source: Energy.gov [DOE]

    Review of the Department of Energy Office of Science Assessment of the Pacific Northwest National Laboratory Radiochemical Processing Laboratory Criticality Alarm System

  5. Independent Oversight Review of the Hanford Site Waste Treatment...

    Energy Savers [EERE]

    ... BNI issued PIER Number 24590-WTP-PIER-MGT-12-1246-B, Rev. 0, Post Installed Anchor Bolt Installation and Documentation, to perform additional actions, including reviewing ...

  6. Independent Oversight Review of the Lawrence Livermore National...

    Broader source: Energy.gov (indexed) [DOE]

    March 2001 Review of the Lawrence Livermore National Laboratory Health Services Department ... Division at the Department of Energy's (DOE) Lawrence Livermore National Laboratory. ...

  7. Independent Oversight Review, Pacific Northwest National Laboratory- September 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of the Fire Protection Program at Pacific Northwest National Laboratory and the Fire Suppression System at the Radiochemical Processing Laboratory

  8. Documentation of Hanford Site independent review of the Hanford Waste Vitrification Plant Preliminary Safety Analysis Report

    SciTech Connect (OSTI)

    Herborn, D.I.

    1991-10-01

    The requirements for Westinghouse Hanford independent review of the Preliminary Safety Analysis Report (PSAR) are contained in Section 1.0, Subsection 4.3 of WCH-CM-4-46. Specifically, this manual requires the following: (1) Formal functional reviews of the HWVP PSAR by the future operating organization (HWVP Operations), and the independent review organizations (HWVP and Environmental Safety Assurance, Environmental Assurance, and Quality Assurance); and (2) Review and approval of the HWVP PSAR by the Tank Waste Disposal (TWD) Subcouncil of the Safety and Environmental Advisory Council (SEAC), which provides independent advice to the Westinghouse Hanford President and executives on matters of safety and environmental protection. 7 refs.

  9. Independent Oversight Review, Savannah River Field Office Tritium...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    work planning and control across U.S. Department of Energy sites that have hazard category 1, 2, and 3 facilities. The review was performed at the Savannah River Site from June ...

  10. Independent Oversight Follow-up Review, Hanford Site - February...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2013 February 2013 Follow-up Review of the Hanford Site Chronic Beryllium Disease Prevention Program The U.S. Department of Energy (DOE) Office of Enforcement and Oversight...

  11. Independent Oversight Follow-up Review, Hanford Site - January...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2014 January 2014 Follow-up Review of the Hanford Site Chronic Beryllium Disease Prevention Program The U.S. Department of Energy (DOE) Office of Enforcement and Oversight...

  12. Independent Review of the July 8, 2010 Fatality at the Strategic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    In consultation with the Assistant Secretary for Fossil Energy (FE), the Chief Health, Safety and Security Officer appointed an Independent Review Board (IRE3) on July 20,201 0, ...

  13. Waste Treatment Plant External Independent Review, Office of River Protection, Richland

    Broader source: Energy.gov [DOE]

    External Independent Review (EIR).  On March 28 - April 1, the Office of Project Management Oversight and Assessments (PM) will lead the site visit for the first phase of the WTP Baseline Change...

  14. Independent Oversight Review of DOE Headquarters Emergency Response Plans and Performance, March 2003

    Broader source: Energy.gov [DOE]

    The Secretary of Energy’s Office of Independent Oversight and Performance Assurance (OA) conducted a review of emergency response plans and performance at DOE Headquarters (HQ) in February 2003.

  15. Independent Review of the July 8, 2010 Fatality at the Strategic Petroleum

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reserve Bryan Mound Site - May 25, 2011 Addendum closing the Investigation based upon the Galveston County Medical Examiner's Report | Department of Energy Independent Review of the July 8, 2010 Fatality at the Strategic Petroleum Reserve Bryan Mound Site - May 25, 2011 Addendum closing the Investigation based upon the Galveston County Medical Examiner's Report Independent Review of the July 8, 2010 Fatality at the Strategic Petroleum Reserve Bryan Mound Site - May 25, 2011 Addendum closing

  16. Independent Technical Review of the X-740 Groundwater Remedy, Portsmouth, Ohio: Technical Evaluation and Recommendations

    SciTech Connect (OSTI)

    Looney, B.; Rhia, B.; Jackson, D.; Eddy-Dilek, C.

    2010-04-30

    Two major remedial campaigns have been applied to a plume of trichloroethene (TCE) contaminated groundwater near the former X-740 facility at the Portsmouth Gaseous Diffusion Plant in Piketon Ohio. The two selected technologies, phytoremediation using a stand of hybrid poplar trees from 1999-2007 and in situ chemical oxidation using modified Fenton's Reagent from 2008-2009, have proven ineffective in achieving remedial action objectives (RAOs). The 'poor' performance of these technologies is a direct result of site specific conditions and the local contaminant hydrogeology. Key among these challenges is the highly heterogeneous subsurface geology with a thin contaminated aquifer zone (the Gallia) - the behavior of the contamination in the Gallia is currently dominated by slow release of TCE from the clay of the overlying Minford formation, from the sandstone of the underlying Berea formation, and from clayey layers within the Gallia itself. In response to the remediation challenges for the X-740 plume, the Portsmouth team (including the US Department of Energy (DOE), the site contractor (CDM), and the Ohio Environmental Protection Agency (OEPA)) is evaluating the feasibility of remediation at this site and identifying specific alternatives that are well matched to site conditions and that would maximize the potential for achieving RAOs. To support this evaluation, the DOE Office of Groundwater and Soil Remediation (EM-32) assembled a team of experts to serve as a resource and provide input and recommendations to Portsmouth. Despite the challenging site conditions and the failure of the previous two remediation campaigns to adequately move the site toward RAOs, the review team was unanimous in the conclusion that an effective combination of cost effective technologies can be identified. Further, the team expressed optimism that RAOs can be achieved if realistic timeframes are accepted by all parties. The initial efforts of the review team focused on reviewing the

  17. DEVELOPMENT AND IMPLEMENTATION OF THE LOS ALAMOS NATIONAL LABORATORY INDEPENDENT SAR REVIEW PROCESS.

    SciTech Connect (OSTI)

    J. BUECK; T. MARTH

    2001-05-01

    Contractor independent review of contractor prepared safety documents has ceased as a requirement under DOE orders. However, a recent study to determine root causes of the poor quality and extremely long approval times for Los Alamos National Laboratory nuclear safety document has identified such a review as a crucial step in ensuring quality. LANL has teamed with the DOE Field Office to reinstate an independent review process modeled after DOE-STD-1104. A review guide has been prepared predicated on the content of DOE-STD-3009. Discipline has been enforced to ensure that comments reflect important issues and that resolution of the comment is possible. Safety management at both LANL and DOE have embraced this concept. This process has been exercised and has resulted in improvements in safety analysis quality and a degree of uniformity between DOE and LANL reviews.

  18. Independent design review report for truck {number_sign}1 modifications for flammable gas tanks

    SciTech Connect (OSTI)

    Wilson, G.W.

    1997-05-09

    The East and West Tank Farm Standing Order 97-01 requires that the PMST be modified to include purging of the enclosed space underneath the shielded receiver weather cover per National Fire Protection Association (NFPA) 496, Purged and Pressurized Enclosures for Electrical Equipment. The Standing Order also requires that the PMST be modified by replacing the existing electrical remote latch (RLU) unit with a mechanical remote latch unit. As the mechanical remote latch unit was exactly like the RLU installed on the Rotary Mode Core Sampler Trucks (RMCST) and the design for the RMCST went through formal design review, replacing the RLU was done utilizing informal design verification and was completed per work package ES-97-0028. As the weather cover purge was similar to the design for the RMCSTS, this design was reviewed using the independent review method with multiple independent reviewers. A function design criteria (WHC-SD-WM-FDC-048, Functional Design Criteria for Core Sampling in Flammable Gas Watch List Tanks) provided the criteria for the modifications. The review consisted of distributing the design review package to the reviewers and collecting and dispositioning the RCR comments. The review package included the ECNs for review, the Design Compliance Matrix, copies of all drawings affected, and copies of outstanding ECNs against these drawings. A final meeting was held to ensure that all reviewers were aware of the changes to ECNs from incorporation of RCR comments.

  19. River Protection Project (RPP) Readiness to Proceed 2 Internal Independent Review Team Final Report

    SciTech Connect (OSTI)

    SCHAUS, P.S.

    2000-03-29

    This report describes the results of an independent review team brought in to assess CH2M Hill Hanford Group's readiness and ability to support the RPP's move into its next major phase - retrieval and delivery of tank waste to the Privatization Contractor

  20. River Protection Project (RPP) Readiness to Proceed 2 Internal Independent Review Team Final Report

    SciTech Connect (OSTI)

    SCHAUS, P.S.

    2000-03-15

    This report describes the results of an independent review team brought in to assess CH2M HILL Hanford's readiness and ability to support the RPP's move into its next major phase - retrieval and delivery of tank waste to the Privatization Contractor.

  1. Independent Oversight Review of the Los Alamos National Laboratory Radiological Controls Activity-Level Implementation, November 2013

    Office of Environmental Management (EM)

    - March 2001 | Department of Energy Review of the Lawrence Livermore National Laboratory - March 2001 Independent Oversight Review of the Lawrence Livermore National Laboratory - March 2001 March 2001 Review of the Lawrence Livermore National Laboratory Health Services Department This report provides the results of an independent oversight review of the Health Services Division at the Department of Energy's (DOE) Lawrence Livermore National Laboratory. The review was performed March 19-21,

  2. 2008-10 "Independent Review of the MDA G CME Report by DOE Office of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Groundwater and Soil Remediation" | Department of Energy 0 "Independent Review of the MDA G CME Report by DOE Office of Groundwater and Soil Remediation" 2008-10 "Independent Review of the MDA G CME Report by DOE Office of Groundwater and Soil Remediation" The intent of this recommendation is to perform an independent and informed review of the MDA G CME which can be referenced by LANL in their discussions with NMED during the NMED acceptance review. This independent

  3. Objective and independent review system for SRP (Savannah River Plant) nonreactor facilities

    SciTech Connect (OSTI)

    Durant, W.S.

    1986-01-29

    The review system described in DPW-83-112 effectively provides objective and independent review for operation of SRP non-reactor nuclear facilities. Safe operation is ensured by trained personnel; an extensive system of Operational Safety Requirements, Technical Standards, written procedures and safety documents; incident investigation and reporting; and internal auditing. Implementation of DOE Order 5480.1A, Chapter V will be completed with issue of Operational Safety Requirements for all the non-reactor designated facilities in March 1986. 6 refs., 1 fig.

  4. Welding and nondestructive examination issues at Seabrook Nuclear Station: An independent review team report

    SciTech Connect (OSTI)

    Spessard, R.L.; Coley, J.; Crowley, W.; Walton, G.

    1990-07-01

    In response to congressional concerns about the adequacy of the welding and nondestructive examination (NDE) programs at the Seabrook Nuclear Station, NRC senior management established an independent review team (IRT) to conduct an assessment. The IRT focused on the quality of the finished hardware and associated records, as well as on the adequacy of the overall quality assurance program as applied to the fabrication and NDE programs for pipe welds. This report documents the findings of that investigation.

  5. ENERGY STAR Webinar: Ask the Expert: Office Hours on Mid-Year Review of Portfolio Manager Enhancement

    Broader source: Energy.gov [DOE]

    Hosted by the U.S. Environmental Protection Agency's (EPA's) ENERGY STAR, this webinar gives all users an opportunity to ask questions directly to EPA experts in an open forum. There will be an...

  6. Multi Canister Overpack (MCO) Handling Machine Independent Review of Seismic Structural Analysis

    SciTech Connect (OSTI)

    SWENSON, C.E.

    2000-09-22

    The following separate reports and correspondence pertains to the independent review of the seismic analysis. The original analysis was performed by GEC-Alsthom Engineering Systems Limited (GEC-ESL) under subcontract to Foster-Wheeler Environmental Corporation (FWEC) who was the prime integration contractor to the Spent Nuclear Fuel Project for the Multi-Canister Overpack (MCO) Handling Machine (MHM). The original analysis was performed to the Design Basis Earthquake (DBE) response spectra using 5% damping as required in specification, HNF-S-0468 for the 90% Design Report in June 1997. The independent review was performed by Fluor-Daniel (Irvine) under a separate task from their scope as Architect-Engineer of the Canister Storage Building (CSB) in 1997. The comments were issued in April 1998. Later in 1997, the response spectra of the Canister Storage Building (CSB) was revised according to a new soil-structure interaction analysis and accordingly revised the response spectra for the MHM and utilized 7% damping in accordance with American Society of Mechanical Engineers (ASME) NOG-1, ''Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder).'' The analysis was re-performed to check critical areas but because manufacturing was underway, designs were not altered unless necessary. FWEC responded to SNF Project correspondence on the review comments in two separate letters enclosed. The dispositions were reviewed and accepted. Attached are supplier source surveillance reports on the procedures and process by the engineering group performing the analysis and structural design. All calculation and analysis results are contained in the MHM Final Design Report which is part of the Vendor Information File 50100. Subsequent to the MHM supplier engineering analysis, there was a separate analyses for nuclear safety accident concerns that used the electronic input data files provided by FWEC/GEC-ESL and are contained in document SNF-6248

  7. Independent Oversight Activity Report for Review of Corrective Actions for Findings from the Independent Oversight Review of Los Alamos National Laboratory Radiological Controls Activity-Level Implementation - February 12, 2014

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    HSS Independent Activity Report - Rev. 0 Report Number: HIAR LANL-2014-02-12 Site: Los Alamos National Laboratory (LANL) Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for Review of Corrective Actions for Findings from the Independent Oversight Review of LANL Radiological Controls Activity-Level Implementation (Published November 2013) Dates of Activity : 02/12/2014 Report Preparer: Robert Freeman, Nuclear Engineer Activity

  8. A review of market monitoring activities at U.S. independent system operators

    SciTech Connect (OSTI)

    Lesieutre, Bernard C.; Goldman, Charles; Bartholomew, Emily

    2004-01-01

    Policymakers have increasingly recognized the structural impediments to effective competition in electricity markets, which has resulted in a renewed emphasis on the need for careful market design and market monitoring in wholesale and retail electricity markets. In this study, we review the market monitoring activities of four Independent System Operators in the United States, focusing on such topics as the organization of an independent market monitoring unit (MMU), the role and value of external market monitors, performance metrics and indices to aid in market analysis, issues associated with access to confidential market data, and market mitigation and investigation authority. There is consensus across the four ISOs that market monitoring must be organizationally independent from market participants and that ISOs should have authority to apply some degree of corrective actions on the market, though scope and implementation differ across the ISOs. Likewise, current practices regarding access to confidential market data by state energy regulators varies somewhat by ISO. Drawing on our interviews and research, we present five examples that illustrate the impact and potential contribution of ISO market monitoring activities to enhance functioning of wholesale electricity markets. We also discuss several key policy and implementation issues that Western state policymakers and regulators should consider as market monitoring activities evolve in the West.

  9. Review of the independent risk assessment of the proposed Cabrillo liquified natural gas deepwater port project.

    SciTech Connect (OSTI)

    Gritzo, Louis Alan; Hightower, Marion Michael; Covan, John Morgan; Luketa-Hanlin, Anay Josephine

    2006-01-01

    In March 2005, the United States Coast Guard requested that Sandia National Laboratories provide a technical review and evaluation of the appropriateness and completeness of models, assumptions, analyses, and risk management options presented in the Cabrillo Port LNG Deepwater Port Independent Risk Assessment-Revision 1 (Cabrillo Port IRA). The goal of Sandia's technical evaluation of the Cabrillo Port IRA was to assist the Coast Guard in ensuring that the hazards to the public and property from a potential LNG spill during transfer, storage, and regasification operations were appropriately evaluated and estimated. Sandia was asked to review and evaluate the Cabrillo Port IRA results relative to the risk and safety analysis framework developed in the recent Sandia report, ''Guidance on Risk Analysis and Safety Implications of a Large Liquefied Natural Gas (LNG) Spill over Water''. That report provides a framework for assessing hazards and identifying approaches to minimize the consequences to people and property from an LNG spill over water. This report summarizes the results of the Sandia review of the Cabrillo Port IRA and supporting analyses. Based on our initial review, additional threat and hazard analyses, consequence modeling, and process safety considerations were suggested. The additional analyses recommended were conducted by the Cabrillo Port IRA authors in cooperation with Sandia and a technical review panel composed of representatives from the Coast Guard and the California State Lands Commission. The results from the additional analyses improved the understanding and confidence in the potential hazards and consequences to people and property from the proposed Cabrillo Port LNG Deepwater Port Project. The results of the Sandia review, the additional analyses and evaluations conducted, and the resolutions of suggested changes for inclusion in a final Cabrillo Port IRA are summarized in this report.

  10. Independent Review of AFC 2A, 2B, and 2E ATR Irradiation Tests

    SciTech Connect (OSTI)

    M. Cappiello; R. Hobbins; K. Penny; L. Walters

    2014-01-01

    As part of the Department of Energy Advanced Fuel Cycle program, a series of fuels development irradiation tests have been performed in the Advanced Test Reactor (ATR) at the Idaho National Laboratory. These tests are providing excellent data for advanced fuels development. The program is focused on the transmutation of higher actinides which best can be accomplished in a sodium-cooled fast reactor. Because a fast test reactor is no longer available in the US, a special test vehicle is used to achieve near-prototypic fast reactor conditions (neutron spectra and temperature) for use in ATR (a water-cooled thermal reactor). As part of the testing program, there were many successful tests of advanced fuels including metals and ceramics. Recently however, there have been three experimental campaigns using metal fuels that experienced failure during irradiation. At the request of the program, an independent review committee was convened to review the post-test analyses performed by the fuels development team, to assess the conclusions of the team for the cause of the failures, to assess the adequacy and completeness of the analyses, to identify issues that were missed, and to make recommendations for improvements in the design and operation of future tests. Although there is some difference of opinion, the review committee largely agreed with the conclusions of the fuel development team regarding the cause of the failures. For the most part, the analyses that support the conclusions are sufficient.

  11. Independent review of Oak Ridge HCTW test program and development of seismic evaluation criteria

    SciTech Connect (OSTI)

    1995-05-01

    Many of the existing buildings at the Oak Ridge Y-12 Plant are steel frame construction with unreinforced hollow clay tile infill walls (HCTW). The HCTW infill provides some lateral seismic resistance to the design/evaluation basis earthquake; however acceptance criteria for this construction must be developed. The basis for the development of seismic criteria is the Oak Ridge HCTW testing and analysis program and the target performance goals of DOE 5480.28 and DOE-STD-1020-94. This report documents and independent review of the testing and analysis program and development of recommended acceptance criteria for Oak Ridge HCTW construction. The HCTW test program included ``macro`` wall in-plane and out-of-plane tests, full-scale wall in-plane and out-of-plane tests, in-situ out-of-plane test, shake table tests, and masonry component tests.

  12. 2011 Biomass Program Peer Review

    SciTech Connect (OSTI)

    Rossmeissl, Neil P.

    2012-02-01

    This document summarizes the recommendations and evaluations provided by an independent external panel of experts at the 2011 U.S. Department of Energy Biomass Programs Peer Review meeting.

  13. Independent Oversight Review, Sodium Bearing Waste Treatment Project- Federal- June 2012

    Broader source: Energy.gov [DOE]

    Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Unit Federal Operational Readiness Review

  14. Independent Oversight Review, Sodium Bearing Waste Treatment Project- Contractor- June 2012

    Broader source: Energy.gov [DOE]

    Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Unit Contractor Operational Readiness Review

  15. Independent Oversight Review, Oak Ridge Office of Environmental Management- February 2012

    Broader source: Energy.gov [DOE]

    Review of the Implementation Verification Review Processes at the Oak Ridge Office of Environmental Management for Building 3019

  16. Independent Oversight Review of the Savannah River Field Office Tritium Facilities Radiological Controls Activity-Level Implementation, November 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Oversight Review of the Savannah River Field Office Tritium Facilities Radiological Controls Activity-Level Implementation May 2011 November 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose................................................................................................................................................ 1 2.0

  17. 1?10 kW Stationary Combined Heat and Power Systems Status and Technical Potential: Independent Review

    SciTech Connect (OSTI)

    Maru, H. C.; Singhal, S. C.; Stone, C.; Wheeler, D.

    2010-11-01

    This independent review examines the status and technical potential of 1-10 kW stationary combined heat and power fuel cell systems and analyzes the achievability of the DOE cost, efficiency, and durability targets for 2012, 2015, and 2020.

  18. Independent Specific Administrative Controls Review, Office of River Protection- December 2010

    Broader source: Energy.gov [DOE]

    Specific Administrative Controls Review with the Office of Environmental Management at the Office of River Protection

  19. Independent Oversight Review, Y-12 National Security Complex – March 2014

    Broader source: Energy.gov [DOE]

    Review of the Uranium Processing Facility Project Design Requirements and Configuration Management Program

  20. Independent Oversight Review, Savannah River Field Office Tritium Facilities – November 2013

    Broader source: Energy.gov [DOE]

    Review of Savannah River Field Office Tritium Facilities Radiological Controls Activity-Level Implementation

  1. Independent Oversight Review, Oak Ridge Transuranic Waste Processing Facility – December 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of the Fire Protection Program and Fire Protection Systems at the Transuranic Waste Processing Center

  2. Independent Oversight Review, Savannah River Site Salt Waste Processing Facility- August 2013

    Broader source: Energy.gov [DOE]

    Review of the Savannah River Site Salt Waste Processing Facility Safety Basis and Design Development.

  3. 2011 Biomass Program Platform Peer Review: Algae

    SciTech Connect (OSTI)

    Yang, Joyce

    2012-02-01

    This document summarizes the recommendations and evaluations provided by an independent external panel of experts at the 2011 U.S. Department of Energy Biomass Program’s Algae Platform Review meeting.

  4. 2011 Biomass Program Platform Peer Review: Analysis

    SciTech Connect (OSTI)

    2012-02-01

    This document summarizes the recommendations and evaluations provided by an independent external panel of experts at the 2011 U.S. Department of Energy Biomass Programs Analysis Platform Review meeting.

  5. 2011 Biomass Program Platform Peer Review. Infrastructure

    SciTech Connect (OSTI)

    Lindauer, Alicia

    2012-02-01

    This document summarizes the recommendations and evaluations provided by an independent external panel of experts at the 2011 U.S. Department of Energy Biomass Programs Infrastructure Platform Review meeting.

  6. 2013 Bioenergy Technologies Office Peer Review Report

    SciTech Connect (OSTI)

    None, None

    2014-02-01

    This document summarizes the recommendations and evaluations provided by an independent external panel of experts at the 2013 U.S. Department of Energy Bioenergy Technologies Office's Peer Review meeting.

  7. 2011 Biomass Program Platform Peer Review: Feedstock

    SciTech Connect (OSTI)

    McCann, Laura

    2012-02-01

    This document summarizes the recommendations and evaluations provided by an independent external panel of experts at the 2011 U.S. Department of Energy Biomass Program’s Feedstock Platform Review meeting.

  8. 2011 Biomass Program Platform Peer Review. Sustainability

    SciTech Connect (OSTI)

    Eng, Alison Goss

    2012-02-01

    This document summarizes the recommendations and evaluations provided by an independent external panel of experts at the 2011 U.S. Department of Energy Biomass Program’s Sustainability Platform Review meeting.

  9. INDEPENDENT TECHNICAL REVIEW OF THE C-400 INTERIM REMEDIAL PROJECT PHASE I RESULTS, PADUCAH, KENTUCKY

    SciTech Connect (OSTI)

    Looney, B.; Rossabi, J.; Stewart,L.; Richards, W.

    2010-10-29

    The groundwater and soil in the vicinity of the C-400 Building at the Paducah Gaseous Diffusion Plant (PGDP), is contaminated with substantial quantities of industrial solvents, primarily trichoroethene (TCE). This solvent 'source' is recognized as a significant challenge and an important remediation target in the overall environmental cleanup strategy for PGDP. Thus, the cleanup of the C-400 TCE Source is a principal focus for the Department of Energy (DOE) and its contractors, and for PGDP regulators and stakeholders. Using a formal investigation, feasibility study and decision process, Electrical Resistance Heating (ERH) was selected for the treatment of the soil and groundwater in the vicinity of C-400. ERH was selected as an interim action to remove 'a significant portion of the contaminant mass of TCE at the C-400 Cleaning Building area through treatment' with the longer term goal of reducing 'the period the TCE concentration in groundwater remains above its Maximum Contaminant Level (MCL).' ERH is a thermal treatment that enhances the removal of TCE and related solvents from soil and groundwater. The heterogeneous conditions at PGDP, particularly the high permeability regional gravel aquifer (RGA), are challenging to ERH. Thus, a phased approach is being followed to implement this relatively expensive and complex remediation technology. Conceptually, the phased approach encourages safety and efficiency by providing a 'lessons learned' process and allowing appropriate adjustments to be identified and implemented prior to follow-on phase(s) of treatment. More specifically, early deployment targeted portions of the challenging RGA treatment zone with relatively little contamination reducing the risk of adverse collateral impacts from underperformance in terms of heating and capture. Because of the importance and scope of the C-400 TCE source remediation activities, DOE chartered an Independent Technical Review (ITR) in 2007 to assess the C-400 ERH plans prior

  10. Independent Oversight Review, Nevada Site Office and National Security Technologies, LLC- November 2011

    Broader source: Energy.gov [DOE]

    Review of Nevada Site Office and National Security Technologies, LLC, Line Oversight and Contractor Assurance Systems Self-Assessment