National Library of Energy BETA

Sample records for independence ecocar challenge

  1. EcoCAR Challenge: Finish Line

    Broader source: Energy.gov [DOE]

    The EcoCAR Challenege is a competition that challenges participating students from across North America to re-engineer a vehicle donated by General Motors. With the goal of minimizing the vehicle...

  2. EcoCAR Challenge: Finish Line

    ScienceCinema (OSTI)

    None

    2013-05-29

    The EcoCAR Challenege is a competition that challenges participating students from across North America to re-engineer a vehicle donated by General Motors. With the goal of minimizing the vehicle's fuel consumption and emissions, while maintaining its utility, safety and performance, teams had to find the best combination of cutting-edge technologies to meet these objectives. In the final year, the vehicles ran through a series of safety and technical tests at GM's Proving Ground in Milford, Michigan very similar to those GM's own production vehicles undergo. As EcoCAR wraps up, it is only the beginning for the next chapter in the DOE's 23-year history of advanced vehicle technology competitions. In April, Assistant Secretary for Policy and International Affairs David Sandalow announced the launch of EcoCAR 2: Plugging into the Future http://www.ecocar2.org/index.html . We look forward to seeing the new and innovative designs that students bring to this challenge and know they will find a way to exceed even our highest expectations.

  3. EcoCAR Challenge: Finish Line

    SciTech Connect (OSTI)

    2011-01-01

    The EcoCAR Challenege is a competition that challenges participating students from across North America to re-engineer a vehicle donated by General Motors. With the goal of minimizing the vehicle's fuel consumption and emissions, while maintaining its utility, safety and performance, teams had to find the best combination of cutting-edge technologies to meet these objectives. In the final year, the vehicles ran through a series of safety and technical tests at GM's Proving Ground in Milford, Michigan very similar to those GM's own production vehicles undergo. As EcoCAR wraps up, it is only the beginning for the next chapter in the DOE's 23-year history of advanced vehicle technology competitions. In April, Assistant Secretary for Policy and International Affairs David Sandalow announced the launch of EcoCAR 2: Plugging into the Future http://www.ecocar2.org/index.html . We look forward to seeing the new and innovative designs that students bring to this challenge and know they will find a way to exceed even our highest expectations.

  4. EcoCAR Challenge Profile: Virginia Tech

    SciTech Connect (OSTI)

    Gantt, Lynn

    2011-01-01

    Since childhood, Lynn Gantt has had a deep seeded passion for cars and the mechanics that drive them. The Virginia native spent his weekends rebuilding antique tractors with his dad to race at tractor pulls across the state, and now the Virginia Tech graduate student is the proud team co-leader of Virginia Tech's EcoCAR Challenge team -- the winners of the three-year long competition, as announced last night at an awards ceremony in Washington, D.C..

  5. EcoCAR Challenge Profile: Virginia Tech

    ScienceCinema (OSTI)

    Gantt, Lynn

    2013-05-29

    Since childhood, Lynn Gantt has had a deep seeded passion for cars and the mechanics that drive them. The Virginia native spent his weekends rebuilding antique tractors with his dad to race at tractor pulls across the state, and now the Virginia Tech graduate student is the proud team co-leader of Virginia Tech's EcoCAR Challenge team -- the winners of the three-year long competition, as announced last night at an awards ceremony in Washington, D.C..

  6. Students Earn Street Cred With the EcoCAR Challenge | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Addthis EcoCAR Challenge Finish Line Event 1 of 8 1 of 8 EcoCAR Challenge Finish Line Event 1 of 8 US Department of Energy Secretary Steven Chu talks shop with members of the West...

  7. EcoCAR: The NeXt Challenge

    Broader source: Energy.gov [DOE]

    Beyond the use of advanced technology, EcoCAR is unique among student competitions in that it provides students with access to and training on the tools used in the industry.

  8. EcoCAR the Next Generation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EcoCAR the Next Generation EcoCAR the Next Generation 2011 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer Evaluation ti013_delarosa_2011_o.pdf (613.84 KB) More Documents & Publications EcoCAR the Next Challenge EcoCAR 2 Plugging into the Future PENN STATE DOE GRADUATE AUTOMOTIVE TECHNOLOGY EDUCATION (GATE) PROGRAM FOR

  9. Virginia Tech Wins EcoCAR Competition | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Virginia Tech Wins EcoCAR Competition Virginia Tech Wins EcoCAR Competition June 17, 2011 - 12:00am Addthis Washington, D.C. - On Thursday evening a team of students from Virginia Tech University learned they received top honors when they were named the overall winners of EcoCAR: The NeXt Challenge after designing and building an extended-range electric vehicle (EREV) using E85 (ethanol). Virginia Tech competed against 15 other universities to take home the top prize of the three-year

  10. Students Drive Home Innovative Engineering in the EcoCAR2 Competition |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Drive Home Innovative Engineering in the EcoCAR2 Competition Students Drive Home Innovative Engineering in the EcoCAR2 Competition April 18, 2011 - 1:52pm Addthis Participants in the EcoCar2 challenge gather for the spring workshop in Ann Arbor, Michigan. Participants in the EcoCar2 challenge gather for the spring workshop in Ann Arbor, Michigan. What does this project do? Engineering students work to re-engineer a standard vehicle, minimizing fuel consumption and

  11. EcoCAR 2 Year 1 Winners Announced! | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Year 1 Winners Announced! EcoCAR 2 Year 1 Winners Announced! May 25, 2012 - 1:21pm Addthis EcoCAR 2: Pluggin in to the Future challenges 15 universities across North America to reduce the environmental impact of a 2013 Chevrolet Malibu by minimizing the vehicles' fuel consumption and reducing its emissions while retaining the vehicle's performance, safety, and consumer appeal. | Photo by Myles Regan. EcoCAR 2: Pluggin in to the Future challenges 15 universities across North America to reduce the

  12. THURSDAY: Secretary Chu Welcomes Students and Tours Vehicles at EcoCAR's

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Finish Line | Department of Energy THURSDAY: Secretary Chu Welcomes Students and Tours Vehicles at EcoCAR's Finish Line THURSDAY: Secretary Chu Welcomes Students and Tours Vehicles at EcoCAR's Finish Line June 15, 2011 - 12:00am Addthis Washington, D.C. - On Thursday, June 16, 2011, Energy Secretary Steven Chu will welcome the sponsors and 16 student teams participating in EcoCAR: the NeXt Challenge, a three-year collegiate student engineering competition that focuses on advanced vehicle

  13. EcoCAR 3: Year 1 Finals in Seattle | Department of Energy

    Energy Savers [EERE]

    2: Meet the Teams Part II EcoCAR 2: Meet the Teams Part II May 30, 2014 - 12:56pm Addthis Shannon Brescher Shea Senior Writer/Editor, Office of Science As college graduation season draws near, so too does EcoCAR 2, the Energy Department competition that challenges the next generation of engineers and scientists to reduce the environmental impact of a Chevrolet Malibu without compromising performance, safety and consumer acceptability. For the past three years, student teams have put their skills

  14. EcoCar Students Spread the Word

    Broader source: Energy.gov [DOE]

    An overview of the creative and engaging ways that teams participating in the EcoCar competition have worked to convey the benefits of advanced technology vehicles to policy makers and students across the U.S. and Canada.

  15. EcoCAR 3 Students Learn and Teach at Winter Workshop

    Broader source: Energy.gov [DOE]

    Last week, EcoCAR 3 students attended the Year Two Winter Workshop held at EcoCAR sponsor NXP’s headquarters in Austin, Texas. As the most recent Energy Department Advanced Vehicle Technology...

  16. EcoCAR 2 Competition: Meet the Teams Part III

    Office of Energy Efficiency and Renewable Energy (EERE)

    The EcoCAR 2 finale starts tomorrow! Meet five of the student teams that are designing and integrating vehicle powertrains that lower the environmental impact of a Chevrolet Malibu without compromising performance, safety and consumer acceptability.

  17. EcoCAR 3 Pushes the Vehicle Efficiency Envelope

    Broader source: Energy.gov [DOE]

    The Department of Energy is partnering with Argonne National Laboratory and General Motors to support the EcoCAR 3 collegiate competition to design, build and optimize eco-friendly powertrains for vehicles.

  18. EcoCAR the Next Challenge

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and techniques, August 15 th for TSC approval of cycle and techniques 2Mode and Fuel Cell software testing Implement final software on advanced systems and test in vehicle...

  19. EcoCAR Challenge Profile: Virginia Tech

    Broader source: Energy.gov [DOE]

    Since childhood, Lynn Gantt has had a deep seeded passion for cars and the mechanics that drive them. The Virginia native spent his weekends rebuilding antique tractors with his dad to race at...

  20. EcoCAR the Next Challenge

    Office of Energy Efficiency and Renewable Energy (EERE)

    2009 DOE Hydrogen Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting, May 18-22, 2009 -- Washington D.C.

  1. EcoCAR 3: Year 1 Finals Power Up University Teams | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EcoCAR 3: Year 1 Finals Power Up University Teams EcoCAR 3: Year 1 Finals Power Up University Teams June 4, 2015 - 12:30pm Addthis 1 of 11 As part of the EcoCAR 3 Advanced Vehicle Technology Competition, university teams from throughout North America will redesign a 2016 Chevrolet Camaro to reduce its environmental impact while maintaining its "muscle car" performance. Image: Courtesy of EcoCAR 3 2 of 11 As part of EcoCAR 3, university teams will receive a set of keys to a brand new

  2. EcoCAR 2: Meet the Teams Part I

    Office of Energy Efficiency and Renewable Energy (EERE)

    Next month, 15 university teams facing off in EcoCAR 2 will reach the home stretch of the race. A two part contest will determine which team is crowned winners of the Energy Department’s latest advanced vehicle technology competition. Meet five of the teams and learn about their unique approaches to building innovative vehicles on the cutting edge of clean transportation.

  3. OSTIblog Articles in the DOE EcoCar 2 Topic | OSTI, US Dept of...

    Office of Scientific and Technical Information (OSTI)

    chart or developing "Living Light", a net-zero energy home for DOE's Solar Decathlon. ... Related Topics: .EDUconnections, cancer, DOE EcoCar 2, DOE's Solar Decathlon, Knoxville, ...

  4. EcoCAR 2 Announces Year One Winner: Mississippi State University |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Announces Year One Winner: Mississippi State University EcoCAR 2 Announces Year One Winner: Mississippi State University May 24, 2012 - 10:40am Addthis NEWS MEDIA CONTACT (202) 586-4940 Los Angeles, Calif. - EcoCAR 2: Plugging In to the Future today named Mississippi State University its Year One winner at the EcoCAR 2012 Competition in Los Angeles. The 15 universities competing in EcoCAR 2 gathered for six days of judged competition this week with $100,000 in prize

  5. EcoCAR 2 Competition Announces Year Two Winner: Penn State University |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Competition Announces Year Two Winner: Penn State University EcoCAR 2 Competition Announces Year Two Winner: Penn State University May 24, 2013 - 2:14pm Addthis News Media Contact (202) 586-4940 SAN DIEGO, Calif. - EcoCAR 2: Plugging In to the Future today named Pennsylvania State University its Year Two winner at the EcoCAR 2013 Competition in San Diego. The 15 universities competing in EcoCAR 2 gathered in Yuma, Arizona last week for six days of rigorous vehicle

  6. The Ohio State University Defends Title, Wins Second Year of EcoCAR 3

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Competition | Department of Energy The Ohio State University Defends Title, Wins Second Year of EcoCAR 3 Competition The Ohio State University Defends Title, Wins Second Year of EcoCAR 3 Competition May 27, 2016 - 4:06pm Addthis The Ohio State University won year two of the four-year EcoCAR 3 Competition. | Photo by Advanced Vehicle Technology Competition The Ohio State University won year two of the four-year EcoCAR 3 Competition. | Photo by Advanced Vehicle Technology Competition NEWS

  7. From General Mechanics to General Motors: Lynn Gantt's EcoCAR Experience |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy From General Mechanics to General Motors: Lynn Gantt's EcoCAR Experience From General Mechanics to General Motors: Lynn Gantt's EcoCAR Experience June 17, 2011 - 3:35pm Addthis Virginia Tech's Lynn Gantt tells us about Virginia Tech's EcoCAR entry. April Saylor April Saylor Former Digital Outreach Strategist, Office of Public Affairs Since childhood, Lynn Gantt has had a deep seeded passion for cars and the mechanics that drive them. The Virginia native spent his

  8. EcoCAR 2: Racing Towards Vehicle Efficiency | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    : Racing Towards Vehicle Efficiency EcoCAR 2: Racing Towards Vehicle Efficiency May 23, 2012 - 1:55pm Addthis Teams of university students are exploring the hardware of plug-in hybrid electric vehicles this week at the EcoCAR 2 finals in Los Angeles, CA. | Energy Department photo, credit Myles Regan. Teams of university students are exploring the hardware of plug-in hybrid electric vehicles this week at the EcoCAR 2 finals in Los Angeles, CA. | Energy Department photo, credit Myles Regan. Connie

  9. EcoCAR 3: Collegiate Teams to Pump up Fuel Efficiency of Iconic American

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Muscle Car | Department of Energy EcoCAR 3: Collegiate Teams to Pump up Fuel Efficiency of Iconic American Muscle Car EcoCAR 3: Collegiate Teams to Pump up Fuel Efficiency of Iconic American Muscle Car May 7, 2014 - 5:03pm Addthis Energy Secretary Ernest Moniz (far right) watches as Assistant Secretary for Energy Efficiency and Renewable Energy David Danielson speaks during the EcoCAR 3 competition launch event in Washington, D.C. on April 24. Student teams from throughout the country will

  10. Students Debut Redesigned 2016 Chevrolet Camaros at EcoCAR 3...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Regenerative braking is used in hybrid electric vehicles to capture and reuse energy from the brakes that would be otherwise lost. EcoCAR 3 Students Learn and Teach at Winter ...

  11. EcoCAR 2 Teams Cruise Forward with Second Year Finals | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Teams Cruise Forward with Second Year Finals EcoCAR 2 Teams Cruise Forward with Second Year Finals May 20, 2013 - 5:44pm Addthis The University of Washington team works on their vehicle while lifted on a hoist. Teams are working in a garage that is fully equipped with tools that will help them make the most of their time this week. | Photo courtesy of EcoCAR 2. The University of Washington team works on their vehicle while lifted on a hoist. Teams are working in a garage that is fully

  12. Students Debut Redesigned 2016 Chevrolet Camaros at EcoCAR 3 Competition

    Broader source: Energy.gov [DOE]

    The third edition of the Energy Department’s EcoCAR competition is underway, as 16 collegiate teams from across North America redesign the 2016 Chevrolet Camaro to reduce its environmental impact while maintaining the performance expected from the iconic American car.

  13. OSTIblog Articles in the DOE EcoCar 2 Topic | OSTI, US Dept of Energy

    Office of Scientific and Technical Information (OSTI)

    Office of Scientific and Technical Information EcoCar 2 Topic University of Tennessee Knoxville in DOE's .EDUconnections Spotlight by Kathy Chambers 04 Sep, 2012 in Science Communications 4266 EDU_UT.jpg University of Tennessee Knoxville in DOE's .EDUconnections Spotlight Read more about 4266 Science is always in the spotlight at the University of Tennessee Knoxville, a land-grant institution and the state's flagship research campus. Recent research might include searching for potential

  14. Mississippi State University Wins DOE and GM Challenge X 2008 Advanced

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vehicle Competition | Department of Energy Mississippi State University Wins DOE and GM Challenge X 2008 Advanced Vehicle Competition Mississippi State University Wins DOE and GM Challenge X 2008 Advanced Vehicle Competition May 21, 2008 - 12:00pm Addthis Launches EcoCAR: The NeXt Challenge WASHINGTON - U.S. Secretary of Energy Samuel W. Bodman today announced that Mississippi State University in Starkville, Miss. is the first place winner of Challenge X, in which 17 university teams from

  15. Challenge

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    trio wins Supercomputing Challenge April 21, 2009 Erika DeBenedictis wins for third time LOS ALAMOS, New Mexico, April 21, 2009- Erika DeBenedictis, Tony Huang, and Chris Hong from La Cueva High School in Albuquerque captured the top prize Tuesday in the 2009 New Mexico Supercomputing Challenge hosted by Los Alamos National Laboratory. This is DeBenedictis' third first-place win in the Challenge and Huang's second. The winning team's project, "A Novel Approach to Asteroid Identification

  16. Challenge

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    duo wins Supercomputing Challenge April 22, 2008 Modeled spacecraft's re-entry into the atmosphere LOS ALAMOS, New Mexico, April 22, 2008- Budding scientists from Albuquerque, Erika DeBenedictis of St. Pius X High School and Tony Huang of La Cueva, captured the top prize Tuesday during the 2008 New Mexico Supercomputing Challenge award ceremony hosted by Los Alamos National Laboratory. The team's project, "An Analysis of Direct Simulation Monte Carlo and Its Application to Simulating

  17. Challenge

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    hosts 12th annual HAZMAT Challenge July 14, 2008 LOS ALAMOS, New Mexico, July 14, 2008 - Fourteen teams are scheduled to participate in the 12th annual HAZMAT Challenge taking place July 15 - 18 at Los Alamos National Laboratory's HAZMAT Training Facility at Technical Area 49. At the Laboratory-sponsored event, teams from New Mexico, Oklahoma, and Arizona demonstrate their hazardous materials response skills and learn new HAZMAT techniques under realistic conditions in a safe environment.

  18. Vehicle Technologies Program Educational Activities

    SciTech Connect (OSTI)

    2011-12-13

    Description of educational activities including: EcoCAR2: Plugging In to the Future, EcoCAR: The NeXt Challenge, Green Racing, Automotive X Prize, Graduate Technology Automotive Education (GATE), and Hydrogen Education.

  19. EcoCAR the Next Generation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Budget Total over 3 years * DOE: 4.5M * Non-DOE 7.313M * Industry CashIn-Kind 75M Headline Diamond Platinum Gold Silver Bronze TM EcoMotors INTERNATIONAL(tm) Task Develop a new ...

  20. EcoCar Drives Students to Innovate

    Broader source: Energy.gov [DOE]

    Teams from 16 North American universities are competing to design a fuel-efficient vehicle that minimizes emissions while maximizing consumer appeal, safety and performance. I recently had the chance to spend time with these bright and enthusiastic students.

  1. Independent Peer Reviews

    SciTech Connect (OSTI)

    2012-03-16

    Independent Assessments: DOE's Systems Integrator convenes independent technical reviews to gauge progress toward meeting specific technical targets and to provide technical information necessary for key decisions.

  2. Supercomputing Challenge

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3rd New Mexico Supercomputing Challenge April 23, 2013 Clustering algorithms to find ... are siblings - took the prize in the 23rd New Mexico Supercomputing Challenge for their ...

  3. Grand Challenges

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Grand Challenges Grand Challenges Our goals to live a sustainable future LANL stakeholders TA-21 cleanup activities water on LANL land Collaborate with our stakeholders and tribal...

  4. ORISE: Independent verification

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Independent verification ORISE techinician performs environmental scanning The Oak Ridge Institute for Science and Education (ORISE) performs independent environmental assessments and verification to determine the effectiveness of radiological cleanup at decontamination and decommissioning (D&D) projects across the United States. Since 1980, ORISE has performed independent verification at more than 500 sites in 42 states and the District of Columbia. As the primary independent verification

  5. Independent Oversight Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-12-21

    The order prescribes the requirements and responsibilities for the DOE Independent Oversight Program. Supersedes DOE O 227.1.

  6. Crossword Challenge

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Crossword National Security Science Latest Issue:April 2016 past issues All Issues » submit Crossword Challenge How closely did you read this issue of NSS? Find out by attempting our crossword puzzle.. March 22, 2016 Crossword Challenge Crossword Challenge Contact Managing Editor Clay Dillingham Email DOWNLOAD THE CROSSWORD CHALLENGE PDF ICON ANSWER SHEET PDF ICON

  7. Independent Statistics & Analysis

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    monthly data for smaller electric power plants that are excluded from the monthly filing ... independent power producers, and electric utility combined heat and power plants. ...

  8. Independent Oversight Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-08-30

    The order prescribes the requirements and responsibilities for the DOE Independent Oversight Program. Cancels DOE O 470.2B. Superseded by DOE O 227.1A.

  9. 1000 Independence Avenue, SW

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    office of small & disadvantaged business utilization 1000 Independence Avenue, SW ... and Disposal office of small & disadvantaged business utilization what does doe purchase? ...

  10. Independent Statistics & Analysis

    U.S. Energy Information Administration (EIA) Indexed Site

    October 2014 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 Quarterly Coal Distribution Report April - June 2014 This report was...

  11. Data Machine Independence

    Energy Science and Technology Software Center (OSTI)

    1994-12-30

    Data-machine independence achieved by using four technologies (ASN.1, XDR, SDS, and ZEBRA) has been evaluated by encoding two different applications in each of the above; and their results compared against the standard programming method using C.

  12. Independent Statistics & Analysis

    U.S. Energy Information Administration (EIA) Indexed Site

    August 2016 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 Quarterly Coal Distribution Report October - December 2015 This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this report therefore

  13. Independent Statistics & Analysis

    U.S. Energy Information Administration (EIA) Indexed Site

    Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 Quarterly Coal Report (Abbreviated) January - March 2016 June 2016 This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this report therefore should

  14. Subsurface Challenges

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    conditions Finding viable, low-risk resources 2. Accessing Safe, ... mitigating impacts of their use constitute major technical and socio-political challenges. ...

  15. Supercomputing Challenge

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to - 2 - analyze, model, and solve real-world problems, said David Kratzer of Los ... at the Supercomputing Challenge Awards Expo on Tuesday at Los Alamos, including ...

  16. Challenge Home

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Dir. & NZEH Coalition Develop and disseminate CH sales training to builder partners Generate media content with builder awards, case studies, and articles Challenge Home Locator ...

  17. Submeter Challenge

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Submeters support a range of activities and savings mechanisms from occupant awareness to ... * Field test * Name Challenge compliant entries * Work with building owners, ...

  18. WBA-14-0001 - In the Matter of Krishnan Balasubramanian | Department of

    Energy Savers [EERE]

    Virginia Tech Wins EcoCAR Competition Virginia Tech Wins EcoCAR Competition June 17, 2011 - 12:00am Addthis Washington, D.C. - On Thursday evening a team of students from Virginia Tech University learned they received top honors when they were named the overall winners of EcoCAR: The NeXt Challenge after designing and building an extended-range electric vehicle (EREV) using E85 (ethanol). Virginia Tech competed against 15 other universities to take home the top prize of the three-year

  19. Independent technical review, handbook

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    Purpose Provide an independent engineering review of the major projects being funded by the Department of Energy, Office of Environmental Restoration and Waste Management. The independent engineering review will address questions of whether the engineering practice is sufficiently developed to a point where a major project can be executed without significant technical problems. The independent review will focus on questions related to: (1) Adequacy of development of the technical base of understanding; (2) Status of development and availability of technology among the various alternatives; (3) Status and availability of the industrial infrastructure to support project design, equipment fabrication, facility construction, and process and program/project operation; (4) Adequacy of the design effort to provide a sound foundation to support execution of project; (5) Ability of the organization to fully integrate the system, and direct, manage, and control the execution of a complex major project.

  20. The Challenge

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... to increase the resilience of a portion of the transmission system of independent system operator (ISO) PJM-which coordinates the movement of wholesale electricity in all or parts ...

  1. Hanford Challenge

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Challenge 219 tst Ave S, Suite 120 Seattle, WA 98104 2013.292.2850 hanfordchallenge.org June 1,2010 Dorothy Riehle FOlA Office U.S. Department of Energy P. O. Box 550 Richland, WA...

  2. Grand Challenges

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Grand Challenges Grand Challenges Our goals to live a sustainable future LANL stakeholders TA-21 cleanup activities water on LANL land Collaborate with our stakeholders and tribal governments to ensure that LANL's impact on the environment is as low as reasonably achievable Remove or stabilize pollutants from the Manhattan Project and Cold War eras Protect water resource quality and reduce water use Stormwater drainage at LANL LANL land waste workers at LANL Eliminate industrial emissions,

  3. Subsurface Challenges

    Office of Environmental Management (EM)

    SubTER Grand Challenge Roundtable: Imaging Geophysical and Geochemical Signals in the Subsurface The Grand Challenge SubTER Panel (Dr. Marcia McNutt, Chair) DOE Leads: Margaret Coleman, Julio Friedmann, Doug Hollett, and Harriet Kung Introduction The future of the world's energy production and deployment is closely tied to our understanding of the subsurface, as well as our capabilities in subsurface or geologic engineering. Developments over the past ten years, including the growth of natural

  4. Independent Cost Estimate (ICE)

    Broader source: Energy.gov [DOE]

    Independent Cost Estimate (ICE). On August 8-12, the Office of Project Management Oversight and Assessments (PM) will conduct an ICE on the NNSA Albuquerque Complex Project (NACP) at Albuquerque, NM. This estimate will support the Critical Decision (CD) for establishing the performance baseline and approval to start construction (CD-2/3). This project is at CD-1, with a total project cost range of $183M to $251M.

  5. 1000 Independence Avenue, SW

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    office of small & disadvantaged business utilization 1000 Independence Avenue, SW Washington, DC 20585 202.586.7377 www.smallbusiness.energy.gov the department purchases a wide variety of goods and services, including, but not limited to: 202.586.7377 www.smallbusiness.energy.gov DOE/SB-0002 * Remediation * Facility Management * Construction * R&D * Management/Scientific Consultation and Analysis * Administrative Services * IT and Data Processing * Security * Engineering * Waste

  6. New York Independent System Operator, Smart Grid RFI: Addressing Policy and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Logistical Challenges. | Department of Energy York Independent System Operator, Smart Grid RFI: Addressing Policy and Logistical Challenges. New York Independent System Operator, Smart Grid RFI: Addressing Policy and Logistical Challenges. In response to the Department of Energy's (DOE) Request for Information regarding smart grid implementation listed in the September 17, 2010 Federal Register, the New York Independent System Operator, Inc. (NYISO) offers the attached white paper entitled

  7. Frame independent cosmological perturbations

    SciTech Connect (OSTI)

    Prokopec, Tomislav; Weenink, Jan E-mail: j.g.weenink@uu.nl

    2013-09-01

    We compute the third order gauge invariant action for scalar-graviton interactions in the Jordan frame. We demonstrate that the gauge invariant action for scalar and tensor perturbations on one physical hypersurface only differs from that on another physical hypersurface via terms proportional to the equation of motion and boundary terms, such that the evolution of non-Gaussianity may be called unique. Moreover, we demonstrate that the gauge invariant curvature perturbation and graviton on uniform field hypersurfaces in the Jordan frame are equal to their counterparts in the Einstein frame. These frame independent perturbations are therefore particularly useful in relating results in different frames at the perturbative level. On the other hand, the field perturbation and graviton on uniform curvature hypersurfaces in the Jordan and Einstein frame are non-linearly related, as are their corresponding actions and n-point functions.

  8. Supercomputing Challenge

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4th New Mexico Supercomputing Challenge April 22, 2014 Modeling Tree Growth and Resource Use with Applications LOS ALAMOS, N.M., April 22, 2014-The dynamic duo of Eli Echt-Wilson and Albert Zuo from La Cueva High in Albuquerque, proposed a unique model that simulates deciduous tree growth at the level of individual branches and leaves based on underlying biological processes. Their project, called Modeling Tree Growth and Resource Use with Applications won the top award at the 24th New Mexico

  9. EcoCAR 2 Plugging into the Future

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Equip Business Managers with professional development skills (risk analysis, FMEA, budgeting, sponsorship development, pitching, etc.) Trains Business Managers for...

  10. EcoCAR Reaches the Finish Line | Department of Energy

    Office of Environmental Management (EM)

    Working with a complex architecture, the team was the first in the history of Advanced Vehicle Technology Competitions to run a fuel cell vehicle in all the dynamic events during ...

  11. EcoCAR 2 Plugging into the Future

    Broader source: Energy.gov [DOE]

    2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

  12. Check Estimates and Independent Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Check estimates and independent cost estimates (ICEs) are tools that can be used to validate a cost estimate. Estimate validation entails an objective review of the estimate to ensure that estimate criteria and requirements have been met and well documented, defensible estimate has been developed. This chapter describes check estimates and their procedures and various types of independent cost estimates.

  13. Distributed Hydrogen Production from Natural Gas: Independent...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Production from Natural Gas: IndependentReview Panel Report Distributed Hydrogen Production from Natural Gas: Independent Review Panel Report Independent review report on the ...

  14. Sequence independent amplification of DNA

    DOE Patents [OSTI]

    Bohlander, S.K.

    1998-03-24

    The present invention is a rapid sequence-independent amplification procedure (SIA). Even minute amounts of DNA from various sources can be amplified independent of any sequence requirements of the DNA or any a priori knowledge of any sequence characteristics of the DNA to be amplified. This method allows, for example, the sequence independent amplification of microdissected chromosomal material and the reliable construction of high quality fluorescent in situ hybridization (FISH) probes from YACs or from other sources. These probes can be used to localize YACs on metaphase chromosomes but also--with high efficiency--in interphase nuclei. 25 figs.

  15. Sequence independent amplification of DNA

    DOE Patents [OSTI]

    Bohlander, Stefan K.

    1998-01-01

    The present invention is a rapid sequence-independent amplification procedure (SIA). Even minute amounts of DNA from various sources can be amplified independent of any sequence requirements of the DNA or any a priori knowledge of any sequence characteristics of the DNA to be amplified. This method allows, for example the sequence independent amplification of microdissected chromosomal material and the reliable construction of high quality fluorescent in situ hybridization (FISH) probes from YACs or from other sources. These probes can be used to localize YACs on metaphase chromosomes but also--with high efficiency--in interphase nuclei.

  16. Midcontinent Independent System Operator, Inc.

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Midcontinent Independent System Operator, Inc. 317.249-5400 www.misoenergy.org PO Box 4202 ... Inc. 317.249-5400 www.misoenergy.org PO Box 4202 Carmel, Indiana 46037 2985 Ames ...

  17. External Independent Review (EIR) Standard Operating Procedure...

    Broader source: Energy.gov (indexed) [DOE]

    External Independent Review (EIR) Standard Operating Procedure (SOP) - September 2010 More Documents & Publications External Independent Review (EIR) Standard Operating Procedure...

  18. Independent Oversight Inspection, Los Alamos National Laboratory...

    Energy Savers [EERE]

    Inspection, Los Alamos National Laboratory - January 2007 Independent Oversight Inspection, Los Alamos National Laboratory - January 2007 January 2007 Independent Oversight...

  19. ChallengeHER | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ChallengeHER ChallengeHER November 6, 2015 8:00AM to 12:30PM EST DOE Main Auditorium 1000 Independence Ave., SW Washington DC 20585 Department of Energy ***DOE's FY 2016 and Beyond Procurement Opportunities*** Friday, November 6, 2015 ♦ 8:00 am to 12:30 pm DOE Main Auditorium ♦ 1000 Independence Ave., SW ♦ Washington DC 20585 All Small Businesses are Encouraged to Attend! Information is power! In order to successfully navigate the federal contracting industry and win federal contracts, you

  20. The Independent Technical Analysis Process

    SciTech Connect (OSTI)

    Duberstein, Corey A.; Ham, Kenneth D.; Dauble, Dennis D.; Johnson, Gary E.

    2007-04-13

    The Bonneville Power Administration (BPA) contracted with the Pacific Northwest National Laboratory (PNNL) to provide technical analytical support for system-wide fish passage information (BPA Project No. 2006-010-00). The goal of this project was to produce rigorous technical analysis products using independent analysts and anonymous peer reviewers. In the past, regional parties have interacted with a single entity, the Fish Passage Center to access the data, analyses, and coordination related to fish passage. This project provided an independent technical source for non-routine fish passage analyses while allowing routine support functions to be performed by other well-qualified entities.

  1. Workplace Charging Challenge

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EV Everywhere Workplace Charging Challenge, committing to install charging for plug-in electric vehicles (PEVs) at their worksites. By taking on this Challenge, they are helping...

  2. EV Everywhere Grand Challenge

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    New non-rare earth magnet/motor designs? Workplace Charging Challenge? HOV Access for EV's

  3. Small Business Independent Market Research Program | National...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Independent Market Research Program Researching, identifying, and evaluating, ... Once a program requirement is identified, an independent research task is activated to ...

  4. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Environmental Management (EM)

    Independent Oversight Review, Los Alamos National Laboratory - January 2012 Independent Oversight Review, Los Alamos National Laboratory Chemistry and Metallurgy Research Facility ...

  5. External Independent Review (EIR) Standard Operating Procedure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    External Independent Review (EIR) Standard Operating Procedure (SOP) October 2008 External Independent Review (EIR) Standard Operating Procedure (SOP) October 2008 External ...

  6. Independent Oversight Review, Bonneville Power Administration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (Independent Oversight), within the Office of Health, Safety and Security, conduct an independent review of the Bonneville Power Administration (BPA) safety management program. ...

  7. Independent Oversight Assessment, Salt Waste Processing Facility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Headquarters - November 2012 Independent Oversight Assessment, Los Alamos National Laboratory - April 2012 An Independent Evaluation of Safety Culture at the U.S....

  8. INDEPENDENT TECHNICAL ASSESSMENT OF MANAGEMENT OF STORMWATER...

    Office of Scientific and Technical Information (OSTI)

    INDEPENDENT TECHNICAL ASSESSMENT OF MANAGEMENT OF STORMWATER AND WASTEWATER AT THE ... Title: INDEPENDENT TECHNICAL ASSESSMENT OF MANAGEMENT OF STORMWATER AND WASTEWATER AT THE ...

  9. NERSC Calculations Provide Independent Confirmation of Global...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Calculations Provide Independent Confirmation of Global Land Warming Since 1901 NERSC Calculations Provide Independent Confirmation of Global Land Warming Since 1901 September 9, ...

  10. Independent Energy Systems IES | Open Energy Information

    Open Energy Info (EERE)

    IES Jump to: navigation, search Name: Independent Energy Systems (IES) Place: Santa Cruz, California Zip: 95062 Product: Independent Energy Systems sells, designs, and installs...

  11. Midwest Independent Transmission System Operator | Open Energy...

    Open Energy Info (EERE)

    Midwest Independent Transmission System Operator Jump to: navigation, search Name: Midwest Independent Transmission System Operator Place: Carmel, IN References: SGIC1 This...

  12. Independent Power Systems | Open Energy Information

    Open Energy Info (EERE)

    Systems is an independent energy consultancy specialising in reducing client energy and environmental costs. References: Independent Power Systems1 This article is a stub. You...

  13. Appraisal Process Protocols, Independent Oversight - December 2015 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Appraisal Process Protocols, Independent Oversight - December 2015 Appraisal Process Protocols, Independent Oversight - December 2015 December 2015 Independent Oversight Appraisal Process Protocols These appraisal process protocols provide an overview of the general process that applies to all independent oversight appraisal activities. The subordinate oversight offices maintain more detailed program plans, guides, procedures, and protocols as necessary to assist in

  14. BIOENERGIZEME INFOGRAPHIC CHALLENGE: BIOfuel

    Office of Energy Efficiency and Renewable Energy (EERE)

    This infographic was created by students from Broad Run HS in Ashburn, VA, as part of the U.S. Department of Energy-BioenergizeME Infographic Challenge. The BioenergizeME Infographic Challenge...

  15. Program Evaluation: Independence, Conflict of Interest, Openness |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Planning & Conducting Evaluations » Program Evaluation: Independence, Conflict of Interest, Openness Program Evaluation: Independence, Conflict of Interest, Openness This page discusses the aspects of independence, conflict of interest, and public vs. closed sessions, in preparation for successful peer reviews. Independence The review leader and the program manager should decide at the outset the desired level of independence and the degree of external control for

  16. U.S. energy independence in 15 years

    SciTech Connect (OSTI)

    Rose, Chris R

    2008-01-01

    Establish U.S. energy independence within 15 years -- This is a enormous systems engineering challenge to thoroughly analyze the present mix of power generation, energy consumption in all sectors such as transportation, industrial, commercial and residential, and devise new technologies to assist the process to independence. At this level, all citizens will be affected, requiring not only effective technologies, but superior cost/benefit ratios and effective free market interactions. With U.S. energy independence, world markets will be influenced. It will be necessary to develop or modify new energy sources, possibly including storage, and adjust or modify energy consumption profiles. Figure 1 shows the expected transition from present-day energy consumption based on both domestic and imported energy. During the 15 year period, the U.S. transitions to energy independence, eliminating imports, and perhaps reduces total energy consumption due to increased efficiency. In the future, U.S. energy consumption is able to grow in accordance with national policies and enhanced domestic capabilities. At the present time, the primary energy import is hydrocarbon products -- primarily oil. Of that imported oil, most of it is used for transportation. In order to reduce the need for imported oil, the U.S. will need to revamp its energy supply and energy consumption mixes. This change in business and usage in the U.S. will require enonnous effort on the part of many organizations and individuals. Los Alamos National Laboratory (LANL) will take the technological lead on this grand challenge. Nearly all directorates, technical, planning and policy capabilities will be brought together and focused on this objective. A simplified chart of the interactions within LANL is shown in Figure 3. Given the enonnous undertaking of U.S. energy independence, the vast engineering, technological and science-based capabilities of LANL will work together performing systems engineering, applied

  17. Chapter 1: Energy Challenges

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    : Energy Challenges September 2015 Quadrennial Technology Review 1 Energy Challenges Energy is the Engine of the U.S. Economy 1 Energy Challenges 1.1 Introduction The United States' energy system, vast in size and increasingly complex, is the engine of the economy. The national energy enterprise has served us well, driving unprecedented economic growth and prosperity and supporting our national security. The U.S. energy system is entering a period of unprecedented change; new technologies, new

  18. Small Wind Independent Testing (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2010-09-01

    This fact sheet describes the Small Wind Independent Testing at the NWTC and the Regional Test Centers project.

  19. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Environmental Management (EM)

    Laboratory Chemistry and Metallurgy Research Facility - January 2012 Independent Oversight Review, Los Alamos National Laboratory Chemistry and Metallurgy Research Facility - ...

  20. Independent Oversight Inspection, Sandia National Laboratories...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sandia National Laboratories, Summary Report - February 2003 Independent Oversight Inspection, Sandia National Laboratories, Summary Report - February 2003 February 2003 Inspection ...

  1. Independent Oversight Activity Report, Pacific Northwest National...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pacific Northwest National Laboratory - January 2014 Independent Oversight Activity Report, Pacific Northwest National Laboratory - January 2014 February 2014 PNNL Corrective...

  2. Independent Activity Report, Sandia National Laboratories - September...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 2012 Independent Activity Report, Sandia National Laboratories - September 2012 September 2012 Operational Awareness Oversight of Sandia National Laboratories HIAR ...

  3. Quality Procedure - Independent Assessments | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Assessments Quality Procedure - Independent Assessments This procedure establishes the process for planning, performing, and reporting Independent Assessments (i.e., assist visits, program/project reviews, direct observations, etc.) as conducted by the Office of Standards and Quality Assurance. Independent assessments are performed at EM Headquarters and Field Offices to determine compliance to requirements and to identify systemic issues, potential risk, emerging issues, and for

  4. Independent Oversight Review, West Valley Demonstration Project...

    Office of Environmental Management (EM)

    West Valley Demonstration Project Transportation - September 2000 Independent Oversight Review, West Valley Demonstration Project Transportation - September 2000 September 2000 ...

  5. SOFT COST GRAND CHALLENGE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    energycenter.org California Center for Sustainable Energy Soft Cost Grand Challenge May 22, 2014 Accelerating the transition to a sustainable world powered by clean energy 2...

  6. Remaining Challenges: Flicker

    Energy Savers [EERE]

    Naomi J. Miller, FIES, FIALD November 2015 DesignerSenior Staff Scientist Pacific Northwest National Laboratory Remaining Challenges: Flicker DOE SSL Workshop - Portland OR Dr....

  7. Rooftop Solar Challenge

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Rooftop Solar Challenge aims to reduce the cost of rooftop solar energy systems through improved permitting, financing, zoning, net metering, and interconnection processes for residential and...

  8. STEM Challenge Winners

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2016 all issues All Issues submit STEM Challenge Winners Students celebrate the Lab's past and future June 1, 2013 Students from Valarde Middle School won the video competition...

  9. Workplace Charging Challenge

    SciTech Connect (OSTI)

    2013-09-01

    Fact sheet about the EV Everywhere Workplace Charging Challenge which is to increase the number of American employers offering workplace charging by tenfold in the next five years.

  10. Mgt. Challenges 2004

    Energy Savers [EERE]

    of areas including science, energy resources, national nuclear security, and environmental quality. ... judgment as to the most serious management challenges facing the Department. ...

  11. Workplace Charging Challenge: Join the Challenge | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plug-in Electric Vehicles & Batteries » Workplace Charging Challenge » Workplace Charging Challenge: Join the Challenge Workplace Charging Challenge: Join the Challenge Workplace Charging Challenge: Join the Challenge The Workplace Charging Challenge aims to have 500 U.S. employers join the initiative as partners by 2018. Partners set a minimum goal of providing charging for a portion of plug-in electric vehicle (PEV) driving employees and a best practice goal of meeting all employee

  12. Sunshot Rooftop Solar Challenge | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sunshot Rooftop Solar Challenge Sunshot Rooftop Solar Challenge Sunshot Rooftop Solar Challenge

  13. BIOENERGIZEME INFOGRAPHIC CHALLENGE: Cellulosic Ethanol | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BIOENERGIZEME INFOGRAPHIC CHALLENGE: Cellulosic Ethanol BIOENERGIZEME INFOGRAPHIC CHALLENGE: Cellulosic Ethanol BIOENERGIZEME INFOGRAPHIC CHALLENGE: Cellulosic Ethanol This...

  14. EM Mercury Challenge

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology Plan to Address the EM Mercury Challenge FEBRUARY 2016 Table of Contents SUMMARY 1 1. BACKGROUND 2 1.1 OAK RIDGE RESERVATION'S MERCURY CHALLENGE 2 1.2 SAVANNAH RIVER SITE'S MERCURY CHALLENGE 3 2. APPROACH 4 3. OREM'S 2014 TECHNOLOGY DEVELOPMENT PLAN 5 4. RESEARCH AND TECHNOLOGY DEVELOPMENT AREAS FOR OAK RIDGE 6 4.1 MERCURY DETECTION AND MEASUREMENT 6 4.2 Y-12 SITE CLEANUP 7 4.3 EAST FORK POPLAR CREEK REMEDIATION 9 4.4 MODELING 10 5. RESEARCH AND TECHNOLOGY DEVELOPMENT AREAS FOR THE

  15. Independent Oversight Focused Program Review, Argonne National

    Office of Environmental Management (EM)

    Laboratory-West - May 2001 | Department of Energy Program Review, Argonne National Laboratory-West - May 2001 Independent Oversight Focused Program Review, Argonne National Laboratory-West - May 2001 May 2001 Focused Program Review at Argonne National Laboratory-West This report provides the results of an independent focused review of the Emergency Management Program at the Department of Energy's Argonne National Laboratory-West site that was conducted by the Office of Independent Oversight

  16. Independent Study Form | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy Independent Oversight Review, Los Alamos National Laboratory - April 2012 Independent Oversight Review, Los Alamos National Laboratory - April 2012 April 2012 Review of the Emergency Response Organization at the Los Alamos National Laboratory This report provides the results of an independent review of the Los Alamos National Laboratory emergency response organization program that was conducted February 7-9, 2012, by the Office of Safety and Emergency Management

  17. GRAND CHALLENGE PROBLEMS

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    GRAND CHALLENGE PROBLEMS Time is the biggest issue. Materials typically become critical in a matter of months, but solutions take years or decades to develop and implement. Our first two grand challenges address this discrepancy. Anticipating Which Materials May Go Critical In an ideal world, users of materials would anticipate supply-chain disruptions before they occur. They would undertake activities to manage the risks of disruption, including R&D to diversify and increase supplies or to

  18. PAFC Cost Challenges

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PAFC Cost Challenges Sridhar Kanuri Manager, PAFC Technology *Sridhar.Kanuri@utcpower.com 2 AGENDA Purecell® 400 cost challenge Cost reduction opportunities Summary 3 PURECELL ® FUEL CELL SYSTEM First cost 2010 cost reduction is being accomplished by incremental changes in technology & low cost sourcing Technology advances are required to reduce further cost and attain UTC Power's commercialization targets 2010 First unit 2010 Last unit Commercialization target Powerplant cost 4

  19. Independent Oversight Special Review, Bechtel Jacobs Company...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bechtel Jacobs Company, LLC - July 2011 Independent Oversight Special Review, Bechtel Jacobs Company, LLC - July 2011 July 2011 Special Review of the SuspectCounterfeit Items ...

  20. Independent Energy Solutions | Open Energy Information

    Open Energy Info (EERE)

    navigation, search Name: Independent Energy Solutions Address: 1090 Joshua Way Place: Vista, California Zip: 92081 Region: Southern CA Area Sector: Solar Product: Renewable...

  1. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant...

    Office of Environmental Management (EM)

    The contractor at PORTS is Fluor-Babcock & Wilcox Portsmouth (FBP). The HSS Office of Safety and Emergency Management Evaluations performed the onsite portion of the Independent ...

  2. Independent Oversight Special Review, Headquarters - August 2008...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Independent Oversight Special Review, Department of Energy sites - February 2008 Focus Group Meeting (Topical Meeting) 10 CFR 851 Worker Safety and ...

  3. External Independent Review (EIR) Standard Operating Procedure...

    Office of Environmental Management (EM)

    Standard Operating Procedure (SOP) May 2016 External Independent Review (EIR) Standard ... The objectives of this EIR Standard Operating Procedure (SOP) document are to clarify EIR ...

  4. Independent Oversight Review, Waste Treatment and Immobilization...

    Broader source: Energy.gov (indexed) [DOE]

    Hanford Site Waste Treatment and Immobilization Plant Project Construction Quality This report documents the results of an independent oversight review of selected aspects of...

  5. Independent Oversight Inspection of Environment, Safety, and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Health Programs at the Savannah River Operations Office and Savannah River Site, January 2010 Independent Oversight Inspection of Environment, Safety, and Health Programs ...

  6. Independent Oversight Review, Advanced Mixed Waste Treatment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Advanced Mixed Waste Treatment Project - April 2013 Independent Oversight Review, Advanced Mixed Waste Treatment Project - April 2013 April 2013 Review of Radiation Protection...

  7. Independent Oversight Review, Richland Operations Office - November...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Richland Operations Office - November 2012 Independent Oversight Review, Richland Operations Office - November 2012 November 2012 Review of the Richland Operations Office Oversight...

  8. Bell Independent Power Corporation | Open Energy Information

    Open Energy Info (EERE)

    Sector: Biofuels, Biomass, Services Product: BIP provides engineering, financial and feasibility services for biofuels, biomass and STEG projects. References: Bell Independent...

  9. Independent Oversight Inspection, Savannah River Site Office...

    Energy Savers [EERE]

    Office - December 2009 Independent Oversight Inspection, Savannah River Site Office - December 2009 December 2009 Inspection of Nuclear Safety at the Savannah River Site Office and ...

  10. Independent Oversight Inspection, Savannah River Site - January...

    Energy Savers [EERE]

    Independent Oversight Inspection, Savannah River Site - January 2010 January 2010 Inspection of Emergency Management at the Savannah River Site This report provides the results of ...

  11. External Independent Review (EIR) Standard Operating Procedure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Office of Project Management Oversight and Assessments (PMOA) performs External Independent Reviews (EIRs) to provide Project Management Executives (PMEs), senior leaders ...

  12. Independent Oversight Targeted Review, Sandia National Laboratories...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 2014 Independent Oversight Targeted Review, Sandia National Laboratories - April 2014 April 2014 Targeted Review of the Sandia National Laboratories Federal Assurance ...

  13. Independent Oversight Review of Integrated Safety Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... on LSO's most recent assessment of LLNL's contractor ... and the request for peer reviews and independent HSS reviews, show that LSO is a learning organization and that ...

  14. Independent Oversight Environment, Oak Ridge National Laboratory...

    Broader source: Energy.gov (indexed) [DOE]

    This report documents the results of an inspection of the environment, safety, and health ... of Independent Oversight's Office of Environment, Safety and Health Evaluations, within ...

  15. Independent Oversight Review, Nevada National Security - May...

    Office of Environmental Management (EM)

    National Security - May 2013 Independent Oversight Review, Nevada National Security - May 2013 May 2013 Review of the Nevada National Security Site Criticality Safety Program ...

  16. Independent Oversight Review, Sodium Bearing Waste Treatment...

    Office of Environmental Management (EM)

    This report documents the results of an independent review of the Sodium Bearing Waste Treatment Project-Integrated Waste Treatment Unit Federal Operational Readiness Review. ...

  17. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Environmental Management (EM)

    The independent review was one part of a targeted assessment of fire protection at nuclear facilities across the DOE complex, including National Nuclear Security Administration ...

  18. Independent Natural Resources Inc | Open Energy Information

    Open Energy Info (EERE)

    Zip: 55344 Product: Designer of a wave converter system. Has patented the SEADOG Pump which uses buoyancy to convert ave energy to mechanical energy. References: Independent...

  19. Independent Activity Report, Lawrence Livermore National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    October 2012 Independent Activity Report, Lawrence Livermore National Laboratory - October 2012 October 2012 Lawrence Livermore National Laboratory Site Lead Planning Activities...

  20. Independent Oversight Activity Report, Hanford Sludge Treatment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sludge Treatment Project - September 2013 Independent Oversight Activity Report, Hanford Sludge Treatment Project - September 2013 November 2013 Hanford Sludge Treatment Project...

  1. Independent Activity Report, Waste Treatment and Immobilization...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste Treatment and Immobilization Plant - March 2013 Independent Activity Report, Waste Treatment and Immobilization Plant - March 2013 March 2013 Follow-up of Waste Treatment and...

  2. Independent Oversight Activity Report, Hanford Waste Treatment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    July 2013 Independent Oversight Activity Report, Hanford Waste Treatment and Immobilization Plant - July 2013 July 2013 Operational Awareness of Waste Treatment and Immobilization...

  3. Independent Activity Report, Los Alamos National Laboratory ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    July 2012 Independent Activity Report, Los Alamos National Laboratory - July 2012 July 2012 Initial Meeting of Representatives from LANL, LASO, and HS-45 To Review Progress and...

  4. Independent Oversight Activity Report, Savannah River Site -...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - February 2014 Independent Oversight Activity Report, Savannah River Site - February 2014 February 2014 Operational Awareness Visit of the Savannah River Site...

  5. Independent Oversight Activity Report, Nevada National Security...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 3-6, 2014 Independent Oversight Activity Report, Nevada National Security Site - March 3-6, 2014 March 2014 Operational Awareness Oversight of the Nevada National Security...

  6. Independent Oversight Activity Report, National Nuclear Security...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Security Administration Production Office - March 10-14, 2014 Independent Oversight Activity Report, National Nuclear Security Administration Production Office - March 10-14,...

  7. Independent Activity Report, Defense Nuclear Facilities Safety...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Defense Nuclear Facilities Safety Board Public Meeting - October 2012 Independent Activity Report, Defense Nuclear Facilities Safety Board Public Meeting - October 2012 October...

  8. Independent Activity Report, Los Alamos National Laboratory ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 2012 Independent Activity Report, Los Alamos National Laboratory - August 2012 August 2012 Defense Nuclear Facilities Safety Board Visit and Site Lead Planning Activities...

  9. Independent Activity Report, West Valley Demonstration Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    West Valley Demonstration Project - July 2012 Independent Activity Report, West Valley Demonstration Project - July 2012 July 2012 Operational Awareness Oversight of the West...

  10. Independent Oversight Activity Report, Idaho Cleanup Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Idaho Cleanup Project - November 2013 Independent Oversight Activity Report, Idaho Cleanup Project - November 2013 November 2013 Pre-restart Visit to the Integrated Waste Treatment...

  11. Independent Activity Report, Hanford Sludge Treatment Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sludge Treatment Project - February 2012 Independent Activity Report, Hanford Sludge Treatment Project - February 2012 February 2012 Hanford Sludge Treatment Project Operational...

  12. Independent Oversight Activity Report, Hanford Waste Treatment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    June 2013 Independent Oversight Activity Report, Hanford Waste Treatment and Immobilization Plant - June 2013 June 2013 Hanford Waste Treatment and Immobilization Plant Low...

  13. Background Information for Independent Review Team. Lifecycle...

    Office of Scientific and Technical Information (OSTI)

    Background Information for Independent Review Team. Lifecycle Plan and FY14 Quarterly ... Visit OSTI to utilize additional information resources in energy science and technology. A ...

  14. Independent Oversight Review, DOE Headquarters Facilities - March...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review of the Headquarters Facilities Emergency Response Plans This report provides the results of an independent review of the emergency response plans for the Department of ...

  15. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review of the Consequence Assessment Program at the Los Alamos National Laboratory This report provides the results of an independent review of the Los Alamos National Laboratory ...

  16. Independent Oversight Review, Rocky Flats Environmental Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review of the Rocky Flats Environmental Technology Site Transportation Emergency Management Program This report provides the results of an independent review of the Transportation ...

  17. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review of the Emergency Response Organization at the Los Alamos National Laboratory This report provides the results of an independent review of the Los Alamos National Laboratory ...

  18. Independent Activity Report, Sandia National Laboratories - March...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 2013 Independent Activity Report, Sandia National Laboratories - March 2013 March 2013 Operational Awareness Oversight of Sandia National Laboratories HIAR SNL-2013-03-18 ...

  19. Independent Activity Report, Sandia National Laboratories - January...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January 2012 Independent Activity Report, Sandia National Laboratories - January 2012 January 2012 Sandia National Laboratories Orientation Visit HIAR-SNL-2012-01-04 This ...

  20. Independent Activity Report, Nevada National Security Site -...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nevada National Security Site Operational Awareness Visit HIAR NNSS-2012-12-03 This Independent Activity Report documents an operational awareness oversight activity conducted by ...

  1. Independent Activity Report, Argonne National Laboratory - August...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This Independent Activity Report documents an operational awareness activity conducted by ... increase HSS personnel's operational awareness of the site's activities, and identify ...

  2. Independent Activity Report, Nevada National Security Site -...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 2012 Operational Awareness Oversight of the Nevada National Security Site HIAR NNSS-2012-08-16 This Independent Activity Report documents an operational awareness ...

  3. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    Independent Oversight Review, Waste Treatment and Immobilization Plant Project - October 2010 October 2010 Review of Nuclear Safety Culture at the Hanford Site Waste Treatment and ...

  4. Independent Oversight Review, Sodium Bearing Waste Treatment...

    Office of Environmental Management (EM)

    Independent Oversight Review, Sodium Bearing Waste Treatment Project - Contractor - June 2012 June 2012 Review of the Sodium Bearing Waste Treatment Project - Integrated Waste ...

  5. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    January 2013 Independent Oversight Review, Waste Treatment and Immobilization Plant - January 2013 January 2013 Review of the Hanford Waste Treatment and Immobilization Plant ...

  6. Independent Oversight Activity Report, Hanford Waste Treatment...

    Office of Environmental Management (EM)

    Independent Oversight Activity Report, Hanford Waste Treatment and Immobilization Plant - ... Conducted in Support of Hanford Site Waste Treatment and Immobilization Plant Select ...

  7. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    October 2012 Independent Oversight Review, Waste Treatment and Immobilization Plant - October 2012 October 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant ...

  8. Independent Oversight Assessment, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    Waste Treatment and Immobilization Plant - January 2012 Independent Oversight Assessment, Waste Treatment and Immobilization Plant - January 2012 January 2012 Assessment of the ...

  9. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    May 2013 Independent Oversight Review, Waste Treatment and Immobilization Plant - May 2013 May 2013 Review of the Hanford Site Waste Treatment and Immobilization Plant Construction ...

  10. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    August 2012 Independent Oversight Review, Waste Treatment and Immobilization Plant - August 2012 August 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant ...

  11. Independent Oversight Review, Richland Operations Office and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and work management and control processes in the areas of conduct of operations, quality assurance, and integrated safety management. Independent Oversight Review, Richland...

  12. Independent Oversight Evaluation, Office of Secure Transportation...

    Office of Environmental Management (EM)

    Emergency Management Program This report provides the results of an independent oversight evaluation of the emergency management program at the Department of Energy's (DOE) Office...

  13. Lessons Learned from Independent Verification Activities

    Office of Environmental Management (EM)

    Demonstration Oak Ridge Institute for Science and Education - Independent Verification Lessons Learned IV - performed at nine DOE sites from 2004 to 2008 Page 1 of 2 Oak Ridge ...

  14. Independent Activity Report, New Brunswick Laboratory - July...

    Broader source: Energy.gov (indexed) [DOE]

    HIAR NBL-2012-07-20 This Independent Activity Report documents an operational awareness activity conducted by Office of Health, Safety and Security's Office of Safety and...

  15. Independent Energy Corporation | Open Energy Information

    Open Energy Info (EERE)

    Independent Energy Corporation Place: Colton, California Zip: 92324 Sector: Hydro, Hydrogen Product: Generator planning to develop build large-scale modular Hydrogen production...

  16. Independent Oversight Review, Savannah River Operations Office...

    Office of Environmental Management (EM)

    - July 2013 July 2013 Review of the Employee Concerns Program at the Savannah River ... O 442.1, DEPARTMENT OF ENERGY EMPLOYEE CONCERNS PROGRAM Independent Activity ...

  17. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Health, Safety and Security (HSS), conducted an independent review of the Los Alamos National Laboratory (LANL) Weapons Engineering Tritium Facility (WETF) safety significant...

  18. External Independent Review (EIR) Standard Operating Procedure...

    Broader source: Energy.gov (indexed) [DOE]

    The objectives of this EIR Standard Operating Procedure (SOP) document are to clarify EIR ... PDF icon External Independent Review (EIR) Standard Operating Procedure (SOP), Revision 3, ...

  19. Independence Biofuels Inc | Open Energy Information

    Open Energy Info (EERE)

    Biofuels Inc Jump to: navigation, search Name: Independence Biofuels Inc Place: Middletown, Pennsylvania Zip: 17057 Sector: Renewable Energy, Vehicles Product: Provides clean,...

  20. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 2011 Independent Oversight Review, Los Alamos National Laboratory - September 2011 September 2011 Review of the Facility Centered Assessment of the Los Alamos National ...

  1. Supplemnental Volume - Independent Oversight Assessment of the...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of Health, Safety and Security HSS i Independent Oversight Assessment of Safety Culture and Management of Nuclear ... Program EM Office of Environmental Management EM-1 ...

  2. Independence, Ohio: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    district.12 Registered Energy Companies in Independence, Ohio Bio Energy LLC Energy Industries of Ohio Five Star Technologies References US Census Bureau...

  3. Independent Oversight Assessment, Pantex Plant - November 2012...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment, Pantex Plant - November 2012 November 2012 Assessment of Nuclear Safety Culture at the Pantex Plant This report provides the results of an independent assessment of...

  4. Independent Oversight Review, Pantex Plant - February 2012 |...

    Office of Environmental Management (EM)

    Plant - February 2012 Independent Oversight Review, Pantex Plant - February 2012 February 2012 Review of the Pantex Plant Implementation Verification Review Processes This report ...

  5. Independent Oversight Activity Report, Hanford Waste Treatment...

    Office of Environmental Management (EM)

    Independent Oversight Activity Report, Hanford Waste Treatment and Immobilization Plant and Tank Farm - January 2014 January 2014 Hanford Waste Treatment and Immobilization Plant ...

  6. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Oversight Review, Waste Treatment and Immobilization Plant - March 2012 March 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant Project ...

  7. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant...

    Office of Environmental Management (EM)

    Plant - November 2013 Independent Oversight Review, Portsmouth Gaseous Diffusion Plant - November 2013 November 5, 2013 Review of Preparedness for Severe Natural Phenomena Events ...

  8. Independent Oversight Review, Waste Treatment and Immobilization...

    Broader source: Energy.gov (indexed) [DOE]

    Plant Construction Quality This report documents the results of an independent oversight review of Construction Quality at the Hanford Site Waste Treatment and Immobilization Plant ...

  9. Independent Oversight Inspection, Pantex Plant, Summary Report...

    Office of Environmental Management (EM)

    Plant, Summary Report - November 2002 Independent Oversight Inspection, Pantex Plant, Summary Report - November 2002 November 2002 Inspection of Environment, Safety, and Health and ...

  10. Independent Activity Report, Portsmouth Gaseous Diffusion Plant...

    Office of Environmental Management (EM)

    Portsmouth Gaseous Diffusion Plant - August 2011 Independent Activity Report, Portsmouth Gaseous Diffusion Plant - August 2011 August 2011 Orientation Visit to the Portsmouth ...

  11. Independent Activity Report, Lawrence Livermore National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    February 2013 Independent Activity Report, Lawrence Livermore National Laboratory - February 2013 February 2013 Lawrence Livermore National Laboratory Operational Drill at the B332 ...

  12. Independent Activity Report, Lawrence Livermore National Laboratory...

    Office of Environmental Management (EM)

    March 2011 Independent Activity Report, Lawrence Livermore National Laboratory - March 2011 March 2011 Lawrence Livermore National Laboratory Chronic Beryllium Disease Prevention ...

  13. Independent Activity Report, Livermore Site Office - January...

    Office of Environmental Management (EM)

    Livermore Site Office - January 2011 Independent Activity Report, Livermore Site Office - January 2011 January 2011 Livermore Site Office Facility Representative Program Assessment ...

  14. Independent Oversight Review, Oak Ridge National Laboratory ...

    Energy Savers [EERE]

    National Laboratory - January 2013 Independent Oversight Review, Oak Ridge National Laboratory - January 2013 January 2013 Review of the Oak Ridge National Laboratory High Flux...

  15. California Independent System Operator | Open Energy Information

    Open Energy Info (EERE)

    search 200px Name: California Independent System Operator Address: California ISO P.O. Box 639014 Place: Folsom, California Zip: 95763-9014 Sector: Services Phone Number:...

  16. Smart Grid RFI: Addressing Policy and Logistical Challenges

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electricity Delivery and Energy Reliability 1000 Independence Avenue, SW Room 8H033 Washington, DC 20585 Submitted electronically via smartgridpolicy@hq.doe.gov Smart Grid Request for Information: Addressing Policy and Logistical Challenges Comments of the Alliance to Save Energy The Alliance to Save Energy (the Alliance) thanks the Department of Energy for the opportunity to comment on broad issues of policy and logistical challenges faced in smart grid implementation. The Alliance to Save

  17. Emerging Opportunities and Challenges in Financing Solar | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Financing Solar Emerging Opportunities and Challenges in Financing Solar Emerging Opportunities and Challenges in Financing Solar Financial innovations-independent of technology-cost improvements-could cut the cost of solar energy to customers and businesses by 30%-60% (see Feldman and Bolinger 2016). Financing is critical to solar deployment, because the costs of solar technologies are paid up front, while their benefits are realized over decades. Solar financing has been shaped by

  18. DOE Responses to DOE Challenge Home (formerly Builders Challenge) National

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Requirements Public Comments | Department of Energy Responses to DOE Challenge Home (formerly Builders Challenge) National Program Requirements Public Comments DOE Responses to DOE Challenge Home (formerly Builders Challenge) National Program Requirements Public Comments DOE Responses to DOE Challenge Home (formerly Builders Challenge) National Program Requirements Public Comments, a publication of the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy.

  19. Safeguards and Security Independent Oversight Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1998-12-23

    Establishes the DOE Safeguards and Security Independent Oversight Program that provides DOE and contractor managers, Congress, and other stakeholders with an independent evaluation of the effectiveness of DOE safeguards and security policy and programs, and the implementation of those policies and programs. Cancels DOE 5630.12A.

  20. Independent Oversight Review, West Valley Demonstration Project

    Office of Environmental Management (EM)

    Transportation - September 2000 | Department of Energy West Valley Demonstration Project Transportation - September 2000 Independent Oversight Review, West Valley Demonstration Project Transportation - September 2000 September 2000 Transportation Emergency Management Review of the West Valley Demonstration Project (WVDP) and National Transportation Program (NTP)/Transportation Compliance Evaluation/Assistance Program (TCEAP) This report provides the results of an independent review of the

  1. Independent Peer Review Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Peer Review Program Independent Peer Review Program 2014 PERT Charter.pdf (680.02 KB) More Documents & Publications Hydropower Vision Task Force Charter Procurement Evaluation & Re-Engineering Team (PERT) and Establishment of a 5-year Cycle with Corresponding Schedule Policy Guidance Memorandum #36 SES Competitive Staffing Procedures

  2. Independent Oversight Review, Bonneville Power Administration Safety

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Program - March 2014 | Department of Energy Bonneville Power Administration Safety Management Program - March 2014 Independent Oversight Review, Bonneville Power Administration Safety Management Program - March 2014 March 2014 Oversight Review of the Bonneville Power Administration Safety Management Program Bonneville Power Administration management requested that the U.S. Department of Energy Office of Enforcement and Oversight (Independent Oversight), within the Office of

  3. Evaluation of the Compressed Air Challenge(R) Training Program...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This Evaluation of the Compressed Air Challenge Training Program was prepared with the ... Evaluation of the Compressed Air Challenge Training Program i ii Table of Contents ...

  4. Challenges facing production grids

    SciTech Connect (OSTI)

    Pordes, Ruth; /Fermilab

    2007-06-01

    Today's global communities of users expect quality of service from distributed Grid systems equivalent to that their local data centers. This must be coupled to ubiquitous access to the ensemble of processing and storage resources across multiple Grid infrastructures. We are still facing significant challenges in meeting these expectations, especially in the underlying security, a sustainable and successful economic model, and smoothing the boundaries between administrative and technical domains. Using the Open Science Grid as an example, I examine the status and challenges of Grids operating in production today.

  5. DOE Challenge Home Verification

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Challenge Home Verification Projected Rating: Based on Plans - Field Confirmation Required. Energy Performance House Ty pe DOE Challenge Home Builder Partner ID# Single-family det ac hed 12345 Y ear built Square footage of Conditioned Space including Basement 2013 3968.0 Numbe r of Bedrooms Square footage of Conditioned Space without Basement 4 2368.0 Site addre ss (if no t available , list the site Lo t #) Registered Builder 555 Main St r eet Cold City Certified Rater MN, 20853 HERS Index

  6. Supercomputing Challenge Expo and

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6-27 for Supercomputing Challenge Expo and awards ceremony April 21, 2010 Research by student teams to be showcased LOS ALAMOS, New Mexico, April 21, 2010-More than 250 New Mexico middle- and high-school students and their teachers are at Los Alamos National Laboratory April 26 and 27 for judging and the awards ceremony in the 20th annual New Mexico Supercomputing Challenge. Of the 98 teams that began the competition last fall, about 70 of them are expected to present at the Expo, said David

  7. Energy Independence and Security Act of 2007 | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independence and Security Act of 2007 Energy Independence and Security Act of 2007 Section 136 of the Energy Independence and Security Act of 2007 establishes an incentive program ...

  8. DOE Challenge Home Label Methodology

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    October 2012 1 Label Methodology DOE Challenge Home Label Methodology October 2012 DOE Challenge Home October 2012 2 Label Methodology Contents Background ............................................................................................................................................... 3 Methodology ............................................................................................................................................. 5 Comfort/Quiet

  9. Radiography Facility - Building 239 Independent Validation Review...

    Office of Scientific and Technical Information (OSTI)

    The purpose of this task was to perform an Independent Validation Review to evaluate the ... The review follows the outline developed for Milestone 1 of the PEP, which is based on the ...

  10. Independence Power Marketing | Open Energy Information

    Open Energy Info (EERE)

    Power Marketing Jump to: navigation, search Name: Independence Power Marketing Place: New York References: EIA Form EIA-861 Final Data File for 2010 - File1a1 EIA Form 861 Data...

  11. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Environmental Management (EM)

    in Technical Area-55 that were conducted July 18 through August 19, 2011. The independent review was performed by the U.S. Department of Energy's (DOE) Office of Safety and ...

  12. Independent Oversight Evaluation, Office of Secure Transportation -

    Office of Environmental Management (EM)

    February 2004 | Department of Energy Evaluation, Office of Secure Transportation - February 2004 Independent Oversight Evaluation, Office of Secure Transportation - February 2004 February 2004 Evaluation of the Office of Secure Transportation Emergency Management Program This report provides the results of an independent oversight evaluation of the emergency management program at the Department of Energy's (DOE) Office of Secure Transportation. The evaluation was performed in October 2003 by

  13. Independent Oversight Inspection, Stanford Linear Accelerator Center -

    Office of Environmental Management (EM)

    Energy Plant - June 2009 Independent Oversight Inspection, Pantex Plant - June 2009 June 2009 Inspection of Environment, Safety, and Health Programs at the Pantex Plant This report documents the results of an inspection of the environment, safety, and health programs at the Department of Energy's (DOE) Pantex Plant. The inspection was performed during March and April 2009 by the DOE Office of Independent Oversight's Office of Environment, Safety and Health Evaluations, which is within the

  14. Independent Oversight Review, National Nuclear Security Administration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Production Office - February 2014 | Department of Energy National Nuclear Security Administration Production Office - February 2014 Independent Oversight Review, National Nuclear Security Administration Production Office - February 2014 February 2014 Review of the National Nuclear Security Administration Production Office Readiness Review Program The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security,

  15. Independent Oversight Targeted Review, Sandia National Laboratories -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 2014 | Department of Energy April 2014 Independent Oversight Targeted Review, Sandia National Laboratories - April 2014 April 2014 Targeted Review of the Sandia National Laboratories Federal Assurance Capability The U.S. Department of Energy (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), conducted an independent review of the performance of the DOE Sandia Field Office safety oversight of the Sandia Corporation. The review was

  16. The Economics of Energy Independence for Iran

    SciTech Connect (OSTI)

    Wood, Thomas W.; Milazzo, Matthew D.; Reichmuth, Barbara A.; Bedell, Jeffrey J.

    2007-03-01

    Iran has pursued an ambitious nuclear program with the declared goal of long-term energy independence. While this is a worthwhile and generally accepted national planning objective, it is clear that the nuclear program as now structured will not achieve it, and in fact may delay it by diverting capital and other resources from projects that would address pressing current energy sector problems and contribute to ultimate energy independence.

  17. Workplace Charging Challenge Partner: Utilidata

    Broader source: Energy.gov [DOE]

    Joined the Challenge: June 2015Headquarters: Providence, RICharging Location: Providence, RIDomestic Employees: 50

  18. The Ohio State University Wins Year One of North American EcoCAR 3 Competition – Defending Their EcoCAR 2 Title

    Broader source: Energy.gov [DOE]

    Four-year collegiate engineering program gives students the chance to design, build, and demonstrate cutting-edge, eco-friendly automotive technologies in the all-new 2016 Chevrolet Camaro.

  19. Workplace Charging Challenge Partner: Southern California Edison...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    California Edison Workplace Charging Challenge Partner: Southern California Edison Workplace Charging Challenge Partner: Southern California Edison Joined the Challenge: February ...

  20. Nuclear Proliferation Challenges

    SciTech Connect (OSTI)

    Professor William Potter

    2005-11-28

    William C. Potter, Director of the Center for Non Proliferation Studies and the Center for Russian and Eurasian Studies at the Monterey Institute of International Studies, will present nuclear proliferation challenges following the 2005 Nuclear Non-Proliferation Treaty (NPT) Review Conference. In addition to elucidating reasons for, and implications of, the conferences failure, Dr. Potter will discuss common ground between nuclear proliferation and terrorism issues and whether corrective action can be taken.

  1. Supercomputing Challenge Program Description

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    | National Nuclear Security Administration | (NNSA) Supercomputers and New Mexico students collide in NNSA-sponsored challenge Wednesday, May 11, 2016 - 10:27am World-class science, technology, and engineering enables NNSA's missions. It's no surprise, then, that our labs and sites support STEM education initiatives ranging from preschool programs to graduate fellowships. Most recently, shining stars of New Mexico schools joined the more than 10,000 students who have gone head-to-head in the

  2. Fermi 2: Independent safety assessment of refueling outage

    SciTech Connect (OSTI)

    Arora, H.O. [Detroit Edison, MI (United States)

    1994-12-31

    Industry experience and studies conducted by the U.S. Nuclear Regulatory Commission (NRC) have shown that plants are susceptible to a variety of events that can challenge safety during shutdowns. While these events have neither posed nor indicated an undue risk to public health and safety, they do serve to underscore the importance of effective outage planning and control. The NUMARC 91-06 guidelines suggest that proper planning and execution of outage activities can reduce the likelihood and consequences of events, which ultimately enhances safety during shutdown. The Fermi 2, Independent Safety Engineering Group (ISEG) is charged with the independent safety review of the refueling outage plan and its implementation. The ISEG is responsible for performing a detailed and critical review of proposed outage plan prior to the start of the outage, maintaining surveillance of the adequacy and consistency of the {open_quotes}defense-in-depth{close_quotes} provided during the outage, reviewing the outage plan changes for potential vulnerabilities that could affect safety functions, and investigating selected events that emerge during the course of the outage.

  3. Independent Oversight and Performance Assurance Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2002-10-31

    The Independent Oversight Program is designed to enhance the DOE safeguards and security; cyber security; emergency management; and environment, safety, and health programs by providing DOE and contractor managers, Congress, and other stakeholders with an independent evaluation of the adequacy of DOE policy and the effectiveness of line management performance in safeguards and security; cyber security; emergency management; environment, safety, and health; and other critical functions as directed by the Secretary. Cancels DOE O 470.2A and Attachment 2 of DOE O 414.1A. Canceled by DOE O 227.1.

  4. Meeting Our Energy Challenges

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Carol Tombari June 9, 2010 State Energy Advisory Board U.S. Department of Energy Meeting Our Energy Challenges: Transitioning from 20 th Century Fuels to 21 st Century Options Humanity's Top Ten Problems for next 50 years 1. Energy 2. Water 3. Food 4. Environment 5. Poverty 6. Terrorism & War 7. Disease 8. Education 9. Democracy 10. Population 2003: 6.3 Billion people 2050: 9-10 Billion people Source: Nobel laureate, Richard Smalley Heat and power for where we live and work Fuel and power

  5. Hydrogen Storage System Challenges

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System Challenges Advanced Composite Materials for Cold and Cryogenic Hydrogen Storage Applications in Fuel Cell Electric Vehicles October 29 th , 2015 Mike Veenstra Ford Research & Advanced Engineering Production fuel cell vehicles are being produced or planned by every major automotive OEM Toyota Honda Hyundai (credit: SA / ANL) Customer Expectations Driving Range Refueling Time Cargo Space Vehicle Weight Durability Cost Safety 0.0 2.0 4.0 6.0 8.0 10.0 Gasoline Hydrogen (700 bar) Natural

  6. Storage - Challenges and Opportunities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nitin Natesan Chicago, IL - Argonne National Laboratory March 20-21, 2013 Storage - Challenges and Opportunities. Workshop on forecourt compression, storage and dispensing RD&D to enable cost reduction. 3/24/2013 Fußzeile 2 Linde Covers The Entire Hydrogen Value Chain LH2 storage On-site Supply & Storage Compression/Transfer Dispenser CGH2 storage Onsite SMR 350 bar Ionic compressor Cryo pump Large-Scale Production Conventional (e.g. SMR) Green (e.g. BTH) 700 bar Onsite Electrolyzer

  7. The Global Energy Challenge

    ScienceCinema (OSTI)

    Crabtree, George

    2010-01-08

    The expected doubling of global energy demand by 2050 challenges our traditional patterns of energy production, distribution and use.   The continued use of fossil fuels raises concerns about supply, security, environment and climate.  New routes are needed for the efficient conversion of energy from chemical fuel, sunlight, and heat to electricity or hydrogen as an energy carrier and finally to end uses like transportation, lighting, and heating. Opportunities for efficient new energy conversion routes based on nanoscale materials will be presented, with emphasis on the sustainable energy technologies they enable.

  8. Challenges of tomorrow. chemistry

    SciTech Connect (OSTI)

    Steindler, M.J. )

    1989-11-01

    According to the author, nuclear materials are going to play an increasing role in concerns regarding proliferation and international affair, with an increased demand for clean electric power, and in environmental and health and safety issues. Challenges range from detecting a single species in a sea of others at molar ratios of 10-{sup 12}, or smaller, to a knowledge of the fundamental physical chemistry (e.g., thermodynamics, activity coefficients, etc., of a two phase system, containing about 40 materials, at 500{sup 0}C) for the lanthanide and actinide elements produced during reactor operation. Other concerns are identified and discussed.

  9. Confronting Challenges | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Confronting Challenges Confronting Challenges Developing solutions to problems Develop a DOE report on land and asset transfers Improve the 10 CFR 770 process Improve the ability to use long-term leases Improve DOE infrastructure planning processes

  10. Energy Independence and Security Act of 2007

    SciTech Connect (OSTI)

    2011-12-30

    An Act passed in 2007 to move the United States toward greater energy independence and security, to increase the production of clean renewable fuels, to protect consumers, to increase the efficiency of products, buildings, and vehicles, to promote research on and deploy greenhouse gas capture and storage options, and to improve the energy performance of the Federal Government, and for other purposes.

  11. Experimental challenges of the N* program

    SciTech Connect (OSTI)

    Ralf Gothe

    2012-04-01

    The first challenge faced in investigating the strong interaction from partially explored, where meson-cloud degrees of freedom dominate, to still unexplored distance scales, where the dressed-quark contributions are the dominating degrees of freedom, is to find an experiment that allows to measure observables that are probing this evolving nonperturbative QCD regime over the full range. Baryon spectroscopy can establish more sensitively, and in an almost model-independent way, nucleon excitation and non-resonant reaction amplitudes by complete measurements of pseudo-scalar meson photoproduction off nucleons. Elastic and transition form factors can then trace this evolution by measurements of elastic electron scattering and exclusive single-meson and double-pion electroproduction cross sections off the nucleon that will be extended to higher momentum transfers with the energy-upgraded CEBAF beam at JLab to study the dressed quark degrees of freedom, where their strong interaction is responsible for the ground and excited nucleon state formations. After establishing unprecedented high-precision data, the immanent next challenge is a high-quality analysis to extract these relevant electrocoupling parameters for various resonances that then can be compared to state of the art models and QCD-based calculations. Recent results demonstrate the status of the analysis and pinpoint further challenges, including those to establish QCD-based results directly from the experimental data.

  12. Independent Statistics & Analysis Drilling Productivity Report

    U.S. Energy Information Administration (EIA) Indexed Site

    Independent Statistics & Analysis Drilling Productivity Report The seven regions analyzed in this report accounted for 92% of domestic oil production growth and all domestic natural gas production growth during 2011-14. August 2016 For key tight oil and shale gas regions U.S. Energy Information Administration Contents Year-over-year summary 2 Bakken Region 3 Eagle Ford Region 4 Haynesville Region 5 Marcellus Region 6 Niobrara Region 7 Permian Region 8 Utica Region 9 Explanatory notes 10

  13. Independent technical review of the Pinellas Plant

    SciTech Connect (OSTI)

    Not Available

    1994-07-01

    This report documents an Independent Technical Review (ITR) of facilities, organizations, plans, activities and various other elements required to successfully transition the Pinellas Plant from Defense Program (DP) funded operation to either community developed reuse or safe deactivation leading to decontamination and decommissioning (D&D). The review was conducted at the request of the Department of Energy (DOE) Deputy Assistant Secretary for Facility Transition and Management (EM-60) and is a consensus of the nine member ITR Team.

  14. Independent Activity Report, Lawrence Livermore National Laboratory -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    February 2013 | Department of Energy February 2013 Independent Activity Report, Lawrence Livermore National Laboratory - February 2013 February 2013 Lawrence Livermore National Laboratory Operational Drill at the B332 Plutonium Facility [HIAR LLNL-2013-02-27] The Livermore Site Office (LSO) and Lawrence Livermore National Security, LLC (LLNS) requested personnel from the U.S. Department of Energy (DOE) Office of Safety and Emergency Management Evaluations (HS-45) to observe an operational

  15. Independent Oversight Inspection, Sandia National Laboratories, Summary

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report - February 2003 | Department of Energy Sandia National Laboratories, Summary Report - February 2003 Independent Oversight Inspection, Sandia National Laboratories, Summary Report - February 2003 February 2003 Inspection of Environment, Safety, and Health and Emergency Management at the Sandia National Laboratories This report provides a summary of the results of an inspection of the environment, safety, and health and emergency management programs at the Department of Energy's (DOE)

  16. Microsoft Word - HABAdv#228_Independent Review of BerylliumProgram...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HAB Consensus Advice 228 Subject: Independent Review of Beryllium Program Adopted: ... Box 450 (H6-60) Richland, WA 99352 Re: Independent Review of Beryllium Program Dear Ms. ...

  17. Independent Oversight Review, Savannah River Site Salt Waste...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security, conducted an independent review ...

  18. Independent Oversight Review, Hanford Site K-West Annex Facility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The U.S. Department of Energy Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security, conducted an independent review of ...

  19. ASEM Green Independent Power Producers Network | Open Energy...

    Open Energy Info (EERE)

    ASEM Green Independent Power Producers Network Jump to: navigation, search Name: ASEM Green Independent Power Producers Network Place: Germany Sector: Renewable Energy Product: A...

  20. New York Independent System Operator, Smart Grid RFI: Addressing...

    Office of Environmental Management (EM)

    New York Independent System Operator, Smart Grid RFI: Addressing Policy and Logistical ... September 17, 2010 Federal Register, the New York Independent System Operator, Inc. ...

  1. Savannah River Site - Salt Waste Processing Facility Independent...

    Office of Environmental Management (EM)

    SALT WASTE PROCESSING FACILITY INDEPENDENT TECHNICAL REVIEW November 22, 2006 Conducted ... Leader SPD-SWPF-217 SPD-SWPF-217: Salt Waste Processing Facility Independent Technical ...

  2. The Office of Independent Enterprise Assessments' Office of Enforcemen...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Office of Independent Enterprise Assessments' Office of Enforcement convened the 2014 DOE Safety and Security Enforcement Workshop May 13 and 14, 2014 The Office of Independent ...

  3. PPC Worley and Independence Biofuels JV | Open Energy Information

    Open Energy Info (EERE)

    Worley and Independence Biofuels JV Jump to: navigation, search Name: PPC, Worley and Independence Biofuels JV Place: Pennsylvania Sector: Biofuels Product: JV between PPC, Worley...

  4. Energy Independence for North America - Transition to the Hydrogen...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independence for North America - Transition to the Hydrogen Economy Energy Independence for North America - Transition to the Hydrogen Economy 2003 DEER Conference Presentation: ...

  5. Computational Challenges for Nanostructure Solar Cells

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Challenges for Nanostructure Solar Cells Computational Challenges for Nanostructure Solar Cells ZZ2.jpg Key Challenges: Current nanostructure solar cells often have energy...

  6. Workplace Charging Challenge Summit 2014: Agenda | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Agenda Workplace Charging Challenge Summit 2014: Agenda Final Agenda for the 2014 Workplace Charging Challenge Summit PDF icon 2014 Workplace Charging Challenge Summit Agenda More ...

  7. Market Challenges | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SSL Basics » Market Challenges Market Challenges Solid-state lighting (SSL) has the potential to significantly reduce lighting energy use and slash greenhouse-gas emissions. By 2030, DOE estimates that SSL could potentially cut national lighting electricity use nearly in half, but a number of challenges stand in the way of achieving the full energy saving potential of SSL. Although SSL products now appear to be competitive in many applications-from bulbs sold in grocery stores to street lights

  8. Albuquerque duo wins Supercomputing Challenge

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Albuquerque wins Supercomputing Challenge Albuquerque duo wins Supercomputing Challenge Erika DeBenedictis and Tony Huang captured the top prize during the 2008 New Mexico Supercomputing Challenge award ceremony. April 22, 2008 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los

  9. Albuquerque trio wins Supercomputing Challenge

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Albuquerque wins Supercomputing Challenge Albuquerque trio wins Supercomputing Challenge Erika DeBenedictis, Tony Huang, and Chris Hong from La Cueva High School captured the top prize in the 2009 New Mexico Supercomputing Challenge. April 21, 2009 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new

  10. Anaerobic MBR: Challenges and Opportunities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8-19, 2015 Anaerobic MBR: Challenges & Opportunities Art Umble, PhD, PE, BCEE Americas Wastewater Practice Leader Symposium: Hydrogen, Hydrocarbons, and Bioproduct Precursors from Wastewaters National Renewable Energy Laboratory Washington, DC 2 Outline ■ Challenge for Municipal Wastewater ■ Membrane Fouling ■ Energy Potential ■ System Economics ■ Research Needs Challenges: Municipal Wastewater Treatment Using AnMBR * Low temperatures in municipal wastewaters * Low strength

  11. Independent technical review of the Mound Plant

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    This report documents an Independent Technical Review (ITR) of the facilities, organizations, plans, and activities required to transition particular elements of the Mound Plant from Defense Program (DP) funded operation as appropriate either to community developed reuse or safe deactivation leading to decontamination and decommissioning (D&D). The review was conducted at the request of the Dr. Willis Bixby, Deputy Assistant Secretary, U.S. Department of Energy EM-60, Office of Facility Transition and Management and is a consensus of the nine member ITR Team. Information for the review was drawn from documents provided to the ITR Team by the Miamisburg Area Office (MB) of the DOE, EG&G, the City of Miamisburg, and others; and from presentations, discussions, interviews, and facility inspections at the Mound Plant during the weeks of March 14 and March 28, 1994. During the week of April 25, 1994, the ITR Team met at Los Alamos, New Mexico to develop consensus recommendations. A presentation of the core recommendations was made at the Mound Plant on May 5, 1994. This is an independent assessment of information available to, and used by, the Mound Plant personnel. Repetition of the information is not meant to imply discovery by the ITR Team. Team members, however, acting as independent reviewers, frequently assess the information from a perspective that differs significantly from that of the Mound Plant personnel. The report is based on information obtained and conditions observed during the March 1994 review interval. The ITR process and normal site work often initiate rapid, beneficial changes in understanding and organization immediately following the review. These changes frequently alter conditions observed during the review, but the report does not address changes subsequent to the review interval.

  12. Engine Lubricants: Trends and Challenges

    Broader source: Energy.gov [DOE]

    This overview discusses how lubricant developers, lubricant marketers, and OEMs are working with the engine community to overcome performance challenges worldwide.

  13. 19th Annual HAZMAT Challenge

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Past Challenge scenarios have included drug laboratory or chemical hazard identification, a complex valve tree, confined space rescue, compressed gas leaks, a leaking rail car ...

  14. EV Everywhere Challenge Battery Workshop

    Broader source: Energy.gov [DOE]

    Backsplash for the EV Everywhere Grand Challenge: Battery Workshop on July 26, 2012 held at the Doubletree O'Hare, Chicago, IL.

  15. Energy Efficiency: Challenges and Progress

    Broader source: Energy.gov (indexed) [DOE]

    power; efficient natural gas; and clean coal Administration Clean Energy Goals 4 | ... EE Challenges * Better Information for Consumers * More Engaged Consumers * Improved ...

  16. lightsource_data_challenge-analysis

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Source Data Analysis & Simulation: The Data Challenge Alexander Hexemer (ALS), Xiaoye Li (CRD), Stefano Marchesini (ALS), Dilworth Parkinson (ALS), Nobumichi Tamura (ALS), Craig E. ...

  17. Pantex Falling Man - Independent Review Panel Report.

    SciTech Connect (OSTI)

    Bertolini, Louis; Brannon, Nathan; Olson, Jared; Price, Bernard; Wardle, Robert; Steinzig, Mike; Winfield, Michael

    2014-11-01

    Consolidated Nuclear Security (CNS) Pantex took the initiative to organize a Review Panel of subject matter experts to independently assess the adequacy of the Pantex Tripping Man Analysis methodology. The purpose of this report is to capture the details of the assessment including the scope, approach, results, and detailed Appendices. Along with the assessment of the analysis methodology, the panel evaluated the adequacy with which the methodology was applied as well as congruence with Department of Energy (DOE) standards 3009 and 3016. The approach included the review of relevant documentation, interactive discussion with Pantex staff, and the iterative process of evaluating critical lines of inquiry.

  18. Model independent determination of the {sigma} pole

    SciTech Connect (OSTI)

    Leutwyler, H.

    2008-08-31

    The first part of this report reviews recent developments at the interface between lattice work on QCD with light dynamical quarks, effective field theory and low energy precision experiments. Then I discuss how dispersion theory can be used to analyze the low energy structure of the {pi}{pi} scattering amplitude in a model independent manner. This leads to an exact formula for the mass and width of the lowest few resonances, in terms of observable quantities. As an application, I consider the pole position of the {sigma}, paying particular to error propagation in the numerical analysis. The report is based on work done in collaboration with Irinel Caprini and Gilberto Colangelo.

  19. NEW - DOE O 227.1A, Independent Oversight Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The order prescribes the requirements and responsibilities for the DOE Independent Oversight Program.

  20. Ohio State University Races to the Finish as the Winner of EcoCAR...

    Office of Environmental Management (EM)

    vehicle that runs on electricity and E85. | Photo ... the vehicle's fuel consumption and reducing its ... In the end, Wayne State University's car had the fastest ...

  1. The Ohio State University Wins Year One of North American EcoCAR...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... AVL Powertrain Engineering, Robert Bosch, LLC, ETAS, PACCAR, dSPACE, Snap-On, Siemens PLM Software, GKN Driveline, Transportation Research Center, Denso, Champlain Cable, ...

  2. EcoCAR2 Teams Start their Virtual Engines | Department of Energy

    Office of Environmental Management (EM)

    ... The fuel cell converts hydrogen into electricity to either propel the vehicle or recharge the battery pack. One team chose a "Split-Parallel Plug-in Hybrid" architecture, which ...

  3. EcoCAR 2 races to the finish line | Department of Energy

    Energy Savers [EERE]

    Earned Value Management Earned Value Management The U.S. Department of Energy (DOE) uses Earned Value Management (EVM) as a project management tool that measures actual performance of work scope and the associated cost and schedule compared to the approved baseline plan for the project. EVM has proven to be a valuable tool for project managers and is now being used in a wide variety of government contracts and in much of the private sector as well. For most construction and cleanup projects, DOE

  4. EcoCAR 3: Collegiate Teams to Pump up Fuel Efficiency of Iconic...

    Office of Environmental Management (EM)

    to make the Chevrolet Camaro more sustainable. | Energy Department photo Energy ... to make the Chevrolet Camaro more sustainable. | Energy Department photo The ...

  5. EcoCAR 2: Meet the Teams Part II | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to building innovative vehicles on the cutting edge of sustainable transportation. ... PHEV has an all-wheel drive component provided by a high-voltage electric traction motor. ...

  6. Model-independent particle accelerator tuning

    SciTech Connect (OSTI)

    Scheinker, Alexander; Pang, Xiaoying; Rybarcyk, Larry

    2013-10-21

    We present a new model-independent dynamic feedback technique, rotation rate tuning, for automatically and simultaneously tuning coupled components of uncertain, complex systems. The main advantages of the method are: 1) It has the ability to handle unknown, time-varying systems, 2) It gives known bounds on parameter update rates, 3) We give an analytic proof of its convergence and its stability, and 4) It has a simple digital implementation through a control system such as the Experimental Physics and Industrial Control System (EPICS). Because this technique is model independent it may be useful as a real-time, in-hardware, feedback-based optimization scheme for uncertain and time-varying systems. In particular, it is robust enough to handle uncertainty due to coupling, thermal cycling, misalignments, and manufacturing imperfections. As a result, it may be used as a fine-tuning supplement for existing accelerator tuning/control schemes. We present multi-particle simulation results demonstrating the schemes ability to simultaneously adaptively adjust the set points of twenty two quadrupole magnets and two RF buncher cavities in the Los Alamos Neutron Science Center Linear Accelerators transport region, while the beam properties and RF phase shift are continuously varying. The tuning is based only on beam current readings, without knowledge of particle dynamics. We also present an outline of how to implement this general scheme in software for optimization, and in hardware for feedback-based control/tuning, for a wide range of systems.

  7. Nuclear Safeguards and Security Challenge:

    National Nuclear Security Administration (NNSA)

    Safeguards and Security Challenge: The international safeguards and security system is being challenged by evolving proliferation and terrorism threats, expanding International Atomic Energy Agency (IAEA) responsibilities, a retiring safeguards workforce, and the need for better technologies to detect and deter proliferation, theft, and sabotage. Response: Revitalize, strengthen, and sustain U.S. and international safeguards and security capabilities through the Next Generation Safeguards

  8. Submeter Challenge | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Submeter Challenge Submeter Challenge Commercial Buildings Integration Project for the 2013 Building Technologies Office's Program Peer Review commlbldgs02_koman_040213.pdf (278.17 KB) More Documents & Publications Technology Performance Exchange - 2013 BTO Peer Review Commercial Buildings Integration Program Overview - 2013 BTO Peer Review Energy Management Systems Package for Small Commercial Buildings

  9. BIOENERGIZEME INFOGRAPHIC CHALLENGE: Photosynthesis: Plants Making...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Photosynthesis: Plants Making Fuel BIOENERGIZEME INFOGRAPHIC CHALLENGE: Photosynthesis: Plants Making Fuel BIOENERGIZEME INFOGRAPHIC CHALLENGE: Photosynthesis: Plants Making Fuel

  10. Presidential Performance Contracting Challenge: Performance Toward...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Presidential Performance Contracting Challenge: Performance Toward New 4 Billion Goal Presidential Performance Contracting Challenge: Performance Toward New 4 Billion Goal ...

  11. Workplace Charging Challenge Partner: University of California...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    California, Santa Barbara Workplace Charging Challenge Partner: University of California, Santa Barbara Workplace Charging Challenge Partner: University of California, Santa ...

  12. International Hydrogen Infrastructure Challenges Workshop Summary...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    International Hydrogen Infrastructure Challenges Workshop Summary - NOW, NEDO, and DOE International Hydrogen Infrastructure Challenges Workshop Summary - NOW, NEDO, and DOE ...

  13. 2016 Bioenergizeme Infographic Challenge: Renewable Alternatives...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Renewable Alternatives: Cellulosic Ethanol 2016 Bioenergizeme Infographic Challenge: Renewable Alternatives: Cellulosic Ethanol 2016 Bioenergizeme Infographic Challenge: Renewable ...

  14. Webinar: International Hydrogen Infrastructure Challenges Workshop...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    International Hydrogen Infrastructure Challenges Workshop Summary - NOW, NEDO, and DOE Webinar: International Hydrogen Infrastructure Challenges Workshop Summary - NOW, NEDO, and ...

  15. TRAC-PF1 independent assessment

    SciTech Connect (OSTI)

    Knight, T.D.; Metzger, V.B.

    1985-10-01

    This report documents the Los Alamos results of the second assessment phase, independent assessment for TRAC-PF1. We documented the results of the developmental assessment for TRAC-PF1 in an earlier report. This report described calculations run with the released versions of TRAC-PF1. We analyzed separate-effects tests in the Semiscale facility to investigate natural-circulation and reflux cooling. We analyzed integral tests from the Semiscale and the Loss-of-Fluid Test facilities to explore the small- and intermediate-break loss-of-coolnt-accident (LOCA) capability and the non-LOCA capability. We also analyzed the loss-of-feedwater transient in the Crystal River plant. The results show reasonably good agreement with the data, but indicate that improvements are required for the critical-flow model and the interphasic-condensation model. 38 refs., 224 figs., 19 tabs.

  16. Model-independent particle accelerator tuning

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Scheinker, Alexander; Pang, Xiaoying; Rybarcyk, Larry

    2013-10-21

    We present a new model-independent dynamic feedback technique, rotation rate tuning, for automatically and simultaneously tuning coupled components of uncertain, complex systems. The main advantages of the method are: 1) It has the ability to handle unknown, time-varying systems, 2) It gives known bounds on parameter update rates, 3) We give an analytic proof of its convergence and its stability, and 4) It has a simple digital implementation through a control system such as the Experimental Physics and Industrial Control System (EPICS). Because this technique is model independent it may be useful as a real-time, in-hardware, feedback-based optimization scheme formore » uncertain and time-varying systems. In particular, it is robust enough to handle uncertainty due to coupling, thermal cycling, misalignments, and manufacturing imperfections. As a result, it may be used as a fine-tuning supplement for existing accelerator tuning/control schemes. We present multi-particle simulation results demonstrating the scheme’s ability to simultaneously adaptively adjust the set points of twenty two quadrupole magnets and two RF buncher cavities in the Los Alamos Neutron Science Center Linear Accelerator’s transport region, while the beam properties and RF phase shift are continuously varying. The tuning is based only on beam current readings, without knowledge of particle dynamics. We also present an outline of how to implement this general scheme in software for optimization, and in hardware for feedback-based control/tuning, for a wide range of systems.« less

  17. Energy Challenge Four: The Baltimore Neighborhood Energy Challenge

    Broader source: Energy.gov [DOE]

    Baltimore Neighborhood Energy Challenge, has been hugely successful at spreading knowledge, resources, and motivation to help the local communities save energy and money by tapping the energy of neighborhood leaders and volunteers.

  18. Energy Challenge Three: The Greenbelt Green Neighborhood Challenge

    Broader source: Energy.gov [DOE]

    This "Greener in Greenbelt" Green Neighborhood Challenge program strives to get local Greenbelt residents (and non-Greenbelters who are interested as well) to sign up for Clean Currents wind-generated electricity for their residences.

  19. TARGETED TECHNOLOGY TRANSFER TO US INDEPENDENTS

    SciTech Connect (OSTI)

    Donald F. Duttlinger; E. Lance Cole

    2005-01-01

    The Petroleum Technology Transfer Council (PTTC) continued pursuing its mission of assisting U.S. independent oil and gas producers with timely, informed technology decisions during Fiscal Year 2004 (FY04). PTTC has active grassroots programs through its 10 Regional Lead Organizations (RLOs) and 2 satellite offices. They bring research and academia to the table via their association with geological surveys and engineering departments. The regional directors interact with independent oil and gas producers through technology workshops, resource centers, websites, newsletters, technical publications and other cooperative outreach efforts. PTTC's Headquarters (HQ) staff receives direction from a National Board of Directors predominantly comprised of American natural gas and oil producers to plan and manage the overall technology transfer program. PTTC HQ implements a comprehensive communications program by interconnecting the talents of the National Board, 10 Regional Producer Advisory Groups (PAG) and the RLOs with industry across the U.S. PTTC effectively combines federal funding through the Department of Energy's (DOE) Office of Fossil Energy, namely the Strategic Center for Natural Gas and Oil with state and industry contributions to share application of upstream technologies. Ultimately, these efforts factor in to provide a safe, secure and reliable energy supply for American consumers. This integrated resource base, combined with industry volunteers guiding PTTC's activities and the dedication of national and regional staff, are achieving notable results regarding domestic production figures. PTTC is increasingly recognized as a critical resource for information and access to technologies by providing direct contact with research, development and demonstration (RD&D) results. A key to the program is demonstrating proven technologies that can be applied broadly and rapidly. This technical progress report summarizes PTTC's accomplishments during FY04. Activities

  20. 2016 Bioenergizeme Infographic Challenge: Bioenergy

    Broader source: Energy.gov [DOE]

    This infographic was created by students from General Douglas MacArthur High School in Levittown, NY, as part of the U.S. Department of Energy-BioenergizeME Infographic Challenge. The BioenergizeME...

  1. BIOENERGIZEME INFOGRAPHIC CHALLENGE: Bessie's Biofuel

    Broader source: Energy.gov [DOE]

    This infographic was created by students from Smithtown HS East in St. James, NY, as part of the U.S. Department of Energy-BioenergizeME Infographic Challenge. The BioenergizeME Infographic...

  2. challenge | OpenEI Community

    Open Energy Info (EERE)

    picture Submitted by Rmckeel(297) Contributor 19 April, 2013 - 13:44 2013 Civic Hacking Day Ideas Apps challenge hackathon The folks at Rally are considering options to help...

  3. Chapter 1 — Energy Challenges

    Broader source: Energy.gov [DOE]

    The introductory chapter of the 2015 Quadrennial Technology Review frames the R&D opportunities, explored in the remainder of the report, in context. It summarizes the state of the system, recent changes, strategic objectives and fundamental challenges.

  4. BIOENERGIZEME INFOGRAPHIC CHALLENGE: Tertiary Treatment

    Office of Energy Efficiency and Renewable Energy (EERE)

    This infographic was created by students from Nikola Tesla STEM High School in Redmond, WA, as part of the U.S. Department of Energy-BioenergizeME Infographic Challenge. The BioenergizeME...

  5. BIOENERGIZEME INFOGRAPHIC CHALLENGE: Biofuel Acts

    Broader source: Energy.gov [DOE]

    This infographic was created by students from Sun Valley High School in Aston, PA, as part of the U.S. Department of Energy-BioenergizeME Infographic Challenge. The BioenergizeME Infographic...

  6. BIOENERGIZEME INFOGRAPHIC CHALLENGE: Environmental Impacts

    Broader source: Energy.gov [DOE]

    This infographic was created by students from Sun Valley High School in Aston, PA, as part of the U.S. Department of Energy-BioenergizeME Infographic Challenge. The BioenergizeME Infographic...

  7. BIOENERGIZEME INFOGRAPHIC CHALLENGE: Cellulosic Ethanol

    Broader source: Energy.gov [DOE]

    This infographic was created by students from Williamsburg HS for Architecture and Design in Brooklyn, NY, as part of the U.S. Department of Energy-BioenergizeME Infographic Challenge. The...

  8. Nuclear Proliferation and Grand Challenges

    SciTech Connect (OSTI)

    McCarthy, Kathy

    2009-01-01

    Nuclear engineer Dr. Kathy McCarthy leads systems analysis. She talks about proliferation and the grand challenges of nuclear R&D. For more information about INL energy research, visit http://www.facebook.com/idahonationallaboratory.

  9. BIOENERGIZEME INFOGRAPHIC CHALLENGE: Bioenergy History

    Broader source: Energy.gov [DOE]

    This infographic was created by students from Sun Valley High School in Aston, PA, as part of the U.S. Department of Energy-BioenergizeME Infographic Challenge. The BioenergizeME Infographic...

  10. Nuclear Proliferation and Grand Challenges

    ScienceCinema (OSTI)

    McCarthy, Kathy

    2013-05-28

    Nuclear engineer Dr. Kathy McCarthy leads systems analysis. She talks about proliferation and the grand challenges of nuclear R&D. For more information about INL energy research, visit http://www.facebook.com/idahonationallaboratory.

  11. Challenge Home | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Challenge Home Challenge Home Residential Buildings Integration Project for the 2013 Building Technologies Office's Program Peer Review resbldgs02_rashkin_040213.pdf (2.31 MB) More Documents & Publications Home Energy Score Update: New Simulation Training and Credential Requirements for Assessors Residential Building Audits and Retrofits Building America Webinar: Put New Tools and Content on the Building America Solution Center To Work for You!

  12. NREL: Wind Research - Small Wind Turbine Independent Testing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Small Wind Turbine Independent Testing One of the barriers for the small wind market has been the lack of small wind turbine systems that are independently tested and certified. To ...

  13. Energy Independence and Security Act of 2007 | Open Energy Information

    Open Energy Info (EERE)

    Energy Independence and Security Act of 2007 Jump to: navigation, search This article is a stub. You can help OpenEI by expanding it. External Links Energy Independence and...

  14. Enforcement Policy: CAC Independent Coil Manufacturers | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy CAC Independent Coil Manufacturers Enforcement Policy: CAC Independent Coil Manufacturers July 13, 2016 DOE has issued an enforcement policy related to certain violations related to an independent coil manufacturer's certification of a basic model of central air conditioner. See the complete policy for details. Enforcement Policy: CAC Independent Coil Manufacturers (3.58 KB) More Documents & Publications ISSUANCE 2016-05-19: Energy Conservation Program: Test Procedures for Central

  15. PROJECT PROFILE: Council of Independent Colleges in Virginia (Solar Market

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pathways) | Department of Energy Council of Independent Colleges in Virginia (Solar Market Pathways) PROJECT PROFILE: Council of Independent Colleges in Virginia (Solar Market Pathways) Title: A Solar Market Pathway for Independent Colleges in Virginia CICV logo.png Funding Opportunity: Solar Market Pathways SunShot Subprogram: Soft Costs Location: Bedford, VA Amount Awarded: $807,563 Awardee Cost Share: $409,357 The Council of Independent Colleges in Virginia (CICV) is leading a Solar

  16. Systems analysis-independent analysis and verification

    SciTech Connect (OSTI)

    Badin, J.S.; DiPietro, J.P.

    1995-09-01

    The DOE Hydrogen Program is supporting research, development, and demonstration activities to overcome the barriers to the integration of hydrogen into the Nation`s energy infrastructure. Much work is required to gain acceptance of hydrogen energy system concepts and to develop them for implementation. A systems analysis database has been created that includes a formal documentation of technology characterization profiles and cost and performance information. Through a systematic and quantitative approach, system developers can understand and address important issues and thereby assure effective and timely commercial implementation. This project builds upon and expands the previously developed and tested pathway model and provides the basis for a consistent and objective analysis of all hydrogen energy concepts considered by the DOE Hydrogen Program Manager. This project can greatly accelerate the development of a system by minimizing the risk of costly design evolutions, and by stimulating discussions, feedback, and coordination of key players and allows them to assess the analysis, evaluate the trade-offs, and to address any emerging problem areas. Specific analytical studies will result in the validation of the competitive feasibility of the proposed system and identify system development needs. Systems that are investigated include hydrogen bromine electrolysis, municipal solid waste gasification, electro-farming (biomass gasifier and PEM fuel cell), wind/hydrogen hybrid system for remote sites, home electrolysis and alternate infrastructure options, renewable-based electrolysis to fuel PEM fuel cell vehicle fleet, and geothermal energy used to produce hydrogen. These systems are compared to conventional and benchmark technologies. Interim results and findings are presented. Independent analyses emphasize quality, integrity, objectivity, a long-term perspective, corporate memory, and the merging of technical, economic, operational, and programmatic expertise.

  17. The Road to Hydrogen--Challenges Ahead in Technology and Manufacturing |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy The Road to Hydrogen--Challenges Ahead in Technology and Manufacturing The Road to Hydrogen--Challenges Ahead in Technology and Manufacturing Presentation prepared by Rick Zalesky for the 2005 Hydrogen Manufacturing R&D Workshop. mfg_wkshp_industry.pdf (679.85 KB) More Documents & Publications Distributed Hydrogen Production from Natural Gas: Independent Review Panel Report Hydrogen Pathways: Cost, Well-to-Wheels Energy Use, and Emissions for the Current

  18. Challenge problems for artificial intelligence

    SciTech Connect (OSTI)

    Selman, B.; Brooks, R.A.; Dean, T.

    1996-12-31

    AI textbooks and papers of ten discuss the big questions, such as {open_quotes}how to reason with uncertainty{close_quotes}, {open_quotes}how to reason efficiently{close_quotes}, or {open_quotes}how to improve performance through learning.{close_quotes} It is more difficult, however, to find descriptions of concrete problems or challenges that are still ambitious and interesting, yet not so open-ended. The goal of this panel is to formulate a set of such challenge problems for the field. Each panelist was asked to formulate one or more challenges. The emphasis is on problems for which there is a good chance that they will be resolved within the next five to ten years.

  19. Campus Challenge - Part 2: Benefits and Challenges of BACnet

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Masica, Ken

    2016-01-15

    Additional challenges of implementing a BACnet network in a large campus environment are explored in this article: providing BACnet campus connectivity, protecting BACnet network traffic, and controlling the resulting broadcast traffic. An example of BACnet implementation is also presented, unifying concepts presented in this and Part One of the article.

  20. Challenge

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Lockheed Martin, Sandia National Laboratories, Siemens Foundation, and Wolfram Research, Inc. are "Gold" commercial partners. "Silver" commercial partners are Gulfstream Group and ...

  1. Vehicle Technologies Office: Workplace Charging Challenge Reports |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Workplace Charging Challenge Reports Vehicle Technologies Office: Workplace Charging Challenge Reports The EV Everywhere Workplace Charging Challenge aims to have 500 U.S. employers offering workplace charging by 2018. These reports describe the progress made in the Challenge. In 2015, the Workplace Charging Challenge celebrated a major milestone - it reached the halfway point to its goal of 500 Challenge partners committed to installing workplace charging by 2018. More

  2. Targeted Technology Transfer to US Independents

    SciTech Connect (OSTI)

    E. Lance Cole

    2009-09-30

    The Petroleum Technology Transfer Council (PTTC) was established by domestic crude oil and natural gas producers, working in conjunction with the Independent Petroleum Association of America (IPAA), the U.S. Department of Energy (DOE) and selected universities, in 1994 as a national not-for-profit organization. Its goal is to transfer Exploration and Production (E&P) technology to the domestic upstream petroleum industry, in particular to the small independent operators. PTTC connects producers, technology providers and innovators, academia, and university/industry/government research and development (R&D) groups. From inception PTTC has received federal funding through DOE's oil and natural gas program managed by the National Energy Technology Laboratory (NETL). With higher funding available in its early years, PTTC was able to deliver well more than 100 workshops per year, drawing 6,000 or more attendees per year. Facing the reality of little or no federal funding in the 2006-2007 time frame, PTTC and the American Association of Petroleum Geologists (AAPG) worked together for PTTC to become a subsidiary organization of AAPG. This change brings additional organizational and financial resources to bear for PTTC's benefit. PTTC has now been 'powered by AAPG' for two full fiscal years. There is a clear sense that PTTC has stabilized and is strengthening its regional workshop and national technology transfer programs and is becoming more entrepreneurial in exploring technology transfer opportunities beyond its primary DOE contract. Quantitative accomplishments: PTTC has maintained its unique structure of a national organization working through Regional Lead Organizations (RLOs) to deliver local, affordable workshops. During the contract period PTTC consolidated from 10 to six regions efficiency and alignment with AAPG sections. The number of workshops delivered by its RLOs during the contract period is shown below. Combined attendance over the period was approximately

  3. BIOENERGIZEME INFOGRAPHIC CHALLENGE: Photosynthesis: Plants Making Fuel |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Photosynthesis: Plants Making Fuel BIOENERGIZEME INFOGRAPHIC CHALLENGE: Photosynthesis: Plants Making Fuel BIOENERGIZEME INFOGRAPHIC CHALLENGE: Photosynthesis: Plants Making Fuel

  4. Vehicles Data Challenge | OpenEI Community

    Open Energy Info (EERE)

    Apps for Vehicles Challenge has begun contest data fuel efficiency launch Obama Administration OpenEI Vehicles Data Challenge **Update: Visit the Apps for Vehicles page for all...

  5. Challenges and Solutions for Multifamily Modeling | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Challenges and Solutions for Multifamily Modeling Challenges and Solutions for Multifamily Modeling This presentation was delivered at the U.S. Department of Energy Building ...

  6. Tribal Energy Summit Tackles Challenges, Explores Opportunities...

    Office of Environmental Management (EM)

    Energy Summit Tackles Challenges, Explores Opportunities on Path to Economic Sovereignty Tribal Energy Summit Tackles Challenges, Explores Opportunities on Path to Economic ...

  7. Analysis of Transportation and Logistics Challenges Affecting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Analysis of Transportation and Logistics Challenges Affecting the Deployment of Larger Wind Turbines: Summary of Results Analysis of Transportation and Logistics Challenges ...

  8. Key Opportunities and Challenges for Program Sustainability ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Key Opportunities and Challenges for Program Sustainability Key Opportunities and Challenges for Program Sustainability Better Buildings Neighborhood Program, Peer Exchange Call: ...

  9. Workplace Charging Challenge Employer Workshop Best Practices...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Challenge Employer Workshop Best Practices Webinar Workplace Charging Challenge Employer Workshop Best Practices Webinar Read the text version. Learn about the experiences of four ...

  10. Workplace Charging Challenge Progress Update 2014

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Progress Update 2014: Employers Take Charge Available at energy.goveerevehiclesev-everywhere-workplace-charging-challenge Workplace Charging Challenge 5 Cumulative...

  11. DOE Challenge Home Recommended Quality Management Provisions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Challenge Home Recommended Quality Management Provisions. PDF icon qm6-14-13.pdf More Documents & Publications Version Tracking Document for DOE Challenge Homes, National ...

  12. Workplace Charging Challenge Partner: Pepco Holdings, Inc. |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Through the Workplace Charging Challenge, PHI is evaluating its employees charging needs. Meet Challenge Partners More Information PHI's Sustainability and Corporate Citizenship ...

  13. Nuclear Waste Challenge | Department of Energy

    Office of Environmental Management (EM)

    Consent-Based Siting Nuclear Waste Challenge Nuclear Waste Challenge Approximate locations of the current sites where spent nuclear fuel and high-level radioactive waste are ...

  14. Shale Gas Development Challenges: Surface Impacts | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Surface Impacts Shale Gas Development Challenges: Surface Impacts Shale Gas Development Challenges: Surface Impacts (657.75 KB) More Documents & Publications Natural Gas from ...

  15. Symbiosis: Addressing Biomass Production Challenges and Climate...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Symbiosis: Addressing Biomass Production Challenges and Climate Change Symbiosis: Addressing Biomass Production Challenges and Climate Change This presentation was the opening ...

  16. Vehicle Technologies Office: Workplace Charging Challenge Progress...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workplace Charging Challenge Progress Update 2014 - Employers Take Charge Vehicle Technologies Office: Workplace Charging Challenge Progress Update 2014 - Employers Take Charge In ...

  17. Workplace Charging Challenge: Sample Workplace Charging Policy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workplace Charging Policy Workplace Charging Challenge: Sample Workplace Charging Policy Review the policy guidelines used by one Workplace Charging Challenge partner to keep their ...

  18. Grand Challenge Portfolio: Driving Innovations in Industrial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Grand Challenge Portfolio: Driving Innovations in Industrial Energy Efficiency, January 2011 Grand Challenge Portfolio: Driving Innovations in Industrial Energy Efficiency, January ...

  19. Workplace Charging Challenge Partner: University of Maryland...

    Energy Savers [EERE]

    The PEV charging stations help UM BWMC to encourage its employees and visitors to adopt "green" lifestyle habits. Meet Challenge Partners Worplace Charging Challenge Committed ...

  20. Workplace Charging Challenge Progress Update 2014

    Broader source: Energy.gov (indexed) [DOE]

    Locations with Charging Workplace Charging Challenge 6 Installing & Planned Charging Stations Almost Doubled in the Last 2 Years Workplace Charging Challenge 7 Partner plans ...

  1. Alternative Fuels Data Center: College Students Engineer Efficient Vehicles

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    in EcoCAR 2 Competition College Students Engineer Efficient Vehicles in EcoCAR 2 Competition to someone by E-mail Share Alternative Fuels Data Center: College Students Engineer Efficient Vehicles in EcoCAR 2 Competition on Facebook Tweet about Alternative Fuels Data Center: College Students Engineer Efficient Vehicles in EcoCAR 2 Competition on Twitter Bookmark Alternative Fuels Data Center: College Students Engineer Efficient Vehicles in EcoCAR 2 Competition on Google Bookmark Alternative

  2. Vehicle Technologies Office: News | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    News Vehicle Technologies Office: News The Vehicle Technologies Office regularly reports on news and success stories from our research, development, and deployment efforts. Along with the below news articles and the success stories database, find out more about the latest in idle reduction through the National Idle Reduction Network News; workplace charging through the Workplace Charging Challenge News; EcoCAR 3 through the Green Garage Blog; Clean Cities through Clean Cities Now and the Clean

  3. New challenges in computational biochemistry

    SciTech Connect (OSTI)

    Honig, B.

    1996-12-31

    The new challenges in computational biochemistry to which the title refers include the prediction of the relative binding free energy of different substrates to the same protein, conformational sampling, and other examples of theoretical predictions matching known protein structure and behavior.

  4. ARPA-E LITECAR Challenge

    SciTech Connect (OSTI)

    Liu, Ping; Salvi, Ashwin

    2015-04-20

    With more than 250 conceptual designs submitted, we are pleased to highlight the winners of the LIghtweighting Technologies Enabling Comprehensive Automotive Redesign (LITECAR) Challenge. These innovative conceptual designs seek to lightweight a vehicle while maintaining or exceeding current U.S. automotive safety standards.

  5. Two Independent Assessments Find the Department of Energy's Yucca Mountain

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project is on Track | Department of Energy Independent Assessments Find the Department of Energy's Yucca Mountain Project is on Track Two Independent Assessments Find the Department of Energy's Yucca Mountain Project is on Track December 13, 2007 - 4:44pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) Director of the Office of Civilian Radioactive Waste Management (OCRWM) today released two independent assessments addressing areas critical to the overall success of the Yucca

  6. Independent Oversight Inspection, East Tennessee Technology Park - November

    Office of Environmental Management (EM)

    Department of Energy Hanford Site - January 2014 Independent Oversight Follow-up Review, Hanford Site - January 2014 January 2014 Follow-up Review of the Hanford Site Chronic Beryllium Disease Prevention Program The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent follow-up review of corrective actions taken to improve the Hanford Site chronic beryllium disease

  7. Independent Oversight Assessment, Salt Waste Processing Facility Project -

    Office of Environmental Management (EM)

    January 2013 | Department of Energy Salt Waste Processing Facility Project - January 2013 Independent Oversight Assessment, Salt Waste Processing Facility Project - January 2013 January 2013 Assessment of Nuclear Safety Culture at the Salt Waste Processing Facility Project The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent assessment of nuclear safety culture at the

  8. Independent Oversight Review, Hanford Tank Farms - April 2013 | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Tank Farms - April 2013 Independent Oversight Review, Hanford Tank Farms - April 2013 April 2013 Review of Management of Safety Systems at the Hanford Tank Farms The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the management of safety class or safety significant structures, systems and components (hereinafter referred to as safety systems) at

  9. Independent Oversight Review, Idaho Cleanup Project - August 2014 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Cleanup Project - August 2014 Independent Oversight Review, Idaho Cleanup Project - August 2014 August 2014 The U.S. Department of Energy?s (DOE) Office of Environment, Safety and Health Assessments, within the DOE Office of Independent Enterprise Assessments (IEA) (formerly the Office of Health, Safety and Security), conducted an independent oversight review of the Integrated Waste Treatment facility contractor readiness assessment (C-RA) at the Idaho Site from January

  10. Independent Oversight Review, Lawrence Livermore National Laboratory - July

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2013 | Department of Energy Lawrence Livermore National Laboratory - July 2013 Independent Oversight Review, Lawrence Livermore National Laboratory - July 2013 July 2013 Review of Preparedness for Severe Natural Phenomena Events at the Lawrence Livermore National Laboratory The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the National Nuclear Security Administration (NNSA) Livermore

  11. Independent Oversight Review, Los Alamos National Laboratory - July 2014 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy July 2014 Independent Oversight Review, Los Alamos National Laboratory - July 2014 July 2014 Review of the Los Alamos National Laboratory Transuranic Waste Facility Safety Basis and Design Development The U.S. Department of Energy's (DOE) Office of Environment, Safety and Health Assessments, within the DOE Office of Independent Enterprise Assessments (formerly the Office of Health, Safety and Security), conducted an independent oversight review of the preliminary safety

  12. Independent Oversight Review, Paducah Site - April 2013 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Paducah Site - April 2013 Independent Oversight Review, Paducah Site - April 2013 April 2013 Review of Preparedness for Severe Natural Phenomena Events at the Paducah Site The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the U.S. Department of Energy (DOE) Paducah site's preparedness for severe natural phenomena events (NPEs). The HSS Office of Safety and Emergency Management

  13. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant - April

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2013 | Department of Energy Portsmouth Gaseous Diffusion Plant - April 2013 Independent Oversight Review, Portsmouth Gaseous Diffusion Plant - April 2013 April 2013 Review of the Integrated Safety Management System Phase I Verification Review at the Portsmouth Gaseous Diffusion Plant The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the U.S. Department of Energy (DOE) Portsmouth/Paducah

  14. Independent Oversight Review, Sandia Site Office - January 2013 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Sandia Site Office - January 2013 Independent Oversight Review, Sandia Site Office - January 2013 January 2013 Review of the Sandia Site Office Quality Assurance Assessment of the Manzano Nuclear Operations The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security, conducted an independent review of the U.S. Department of Energy (DOE) Sandia Site Office (SSO) quality assurance (QA) assessment of the Manzano nuclear

  15. Independent Oversight Review, Savannah River Site - January 2013 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy - January 2013 Independent Oversight Review, Savannah River Site - January 2013 January 2013 Review of the Savannah River Site, Waste Solidification Building, Construction Quality of Mechanical Systems Installation and Selected Aspects of Fire Protection System Design The Office of Enforcement and Oversight (Independent Oversight), within the U.S. Department of Energy (DOE) Office of Health, Safety and Security (HSS), conducted an independent review of construction

  16. Independent Oversight Review, Savannah River Site Salt Waste Processing

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Facility - April 2014 | Department of Energy Salt Waste Processing Facility - April 2014 Independent Oversight Review, Savannah River Site Salt Waste Processing Facility - April 2014 April 2014 Review of the Savannah River Site Salt Waste Processing Facility Construction Quality and Fire Protection Systems The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security, conducted an independent review of the

  17. Independent Oversight Review, Waste Isolation Pilot Plant - November 2012 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Isolation Pilot Plant - November 2012 Independent Oversight Review, Waste Isolation Pilot Plant - November 2012 November 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Waste Isolation Pilot Plant The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the U.S. Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) preparedness for severe

  18. Independent Oversight Review, Waste Treatment and Immobilization Plant -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January 2013 | Department of Energy January 2013 Independent Oversight Review, Waste Treatment and Immobilization Plant - January 2013 January 2013 Review of the Hanford Waste Treatment and Immobilization Plant Black-Cell and Hard-To-Reach Pipe Spools Procurement Process and the Office of River Protection Audit of That Process The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted a concurrent independent review with

  19. Independent Oversight Review, Waste Treatment and Immobilization Plant -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    May 2013 | Department of Energy May 2013 Independent Oversight Review, Waste Treatment and Immobilization Plant - May 2013 May 2013 Review of the Hanford Site Waste Treatment and Immobilization Plant Construction Quality The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight) within the Office of Health, Safety and Security (HSS) conducted an independent review of selected aspects of construction quality at the Hanford Site Waste Treatment and

  20. Targeted Technology Transfer to US Independents

    SciTech Connect (OSTI)

    Schatzinger, Viola; Chapman, Kathy; Lovendahl, Kristi

    2014-09-30

    The Petroleum Technology Transfer Council (PTTC) is a unique not-for-profit network that focuses on transferring Exploration and Production (E&P) technology to the domestic oil and natural gas producing industry. PTTC connects producers, technology providers and innovators, academia, research and development (R&D) consortiums and governments. Local affordable workshops delivered by Regional Lead Organizations (RLOs), which are typically a university or geological survey, are a primary tool. PTTC also maintains a website network, issues a national newsletter, provides a column in a major trade publication, and exhibits at major industry events. It also encourages industry to ask technology-related questions, striving to find relevant answers that will save questioners significant time. Working since late 1993, the PTTC network has a proven track record of providing industry with technology insights they can apply. Volunteers at the regional and national level provide key guidance regarding where to focus technical effort and help connect PTTC with industry. At historical funding levels, PTTC had been able to hold well more than 100 workshops per year, drawing 6,000+ attendees. As funding decreased in the early 2000s, the level of activity decreased and PTTC sought a merger with the American Association of Petroleum Geologists (AAPG), becoming an AAPG-managed organization at the start of FY08. This relationship with AAPG was terminated by mutual consent in May 2011 and PTTC once again operates independently. Chris Hall, California continued to serve as Chairman of the Board of Directors until December 2013. At the time PTTC reorganized into a RLO led organization with Mary Carr and Jeremy Viscomi as co-Executive Directors. Jerry Anderson became the Chairman of the PTTC Board of Directors and Chris Hall continues to serve on the Board. Workshop activity stabilized at 55-65 workshops per year averaging 3,100 attendees. FY14 represented the fifth year in a multi

  1. Independent Oversight Review, Hanford K Basin and Cold Vacuum...

    Broader source: Energy.gov (indexed) [DOE]

    Hanford K Basin and Cold Vacuum Drying Facility Found Fuel Multi-Canister Overpack Operations This report provides the results of an independent oversight review of operations...

  2. Independent Activity Report, Pantex Plant - July 2012 | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Report, Pantex Plant - November 2012 Independent Activity Report, Pantex Plant - October 2011 Technical Qualification Program Self-Assessment Report - NNSA Production Office - 2014...

  3. Independent Oversight Review, Savannah River Site Tritium Facilities...

    Broader source: Energy.gov (indexed) [DOE]

    Facilities - June 2012 More Documents & Publications Technical Qualification Program Self-Assessment Report - Savannah River Site Office - 2011 Independent Oversight Review,...

  4. Independent Oversight Follow-up Review, Idaho Site - January...

    Office of Environmental Management (EM)

    Follow-up Review of Activity-Level Implementation of Radiation Controls and Radiological ... This report documents the results of an independent oversight review of radiation ...

  5. Independent Activity Report, Los Alamos Site Office - April 2012...

    Office of Environmental Management (EM)

    Independent Activity Report, Los Alamos Site Office - April 2012 April 2012 Los Alamos Site Office Nuclear Maintenance Management Program Oversight Self-Assessment ...

  6. Platform-Independent Method for Detecting Errors in Metagenomic...

    Office of Scientific and Technical Information (OSTI)

    Title: Platform-Independent Method for Detecting Errors in Metagenomic Sequencing Data: DRISEE Authors: Keegan, K. P. ; Trimble, W. L. ; Wilkening, J. ; Wilke, A. ; Harrison, T. ; ...

  7. Independent Oversight Lessons Learned Report, Department of Energy...

    Energy Savers [EERE]

    Office of Independent Oversight and Performance Assurance's Office of Environment, Safety and Health Evaluations, within the Office of Security and Safety Performance Assurance. ...

  8. Independent Oversight Follow-up Review, Savannah River National...

    Office of Environmental Management (EM)

    Review, Los Alamos National Laboratory - December 2013 Independent Oversight Review, Los Alamos National Laboratory Chemistry and Metallurgy Research Facility - January 2012

  9. Independent Oversight Review, Los Alamos National Laboratory- December 2011

    Broader source: Energy.gov [DOE]

    Review of the Independent Integrated Safety Management/Integrated Work Management Assessment of Research and Development and Programmatic Work at the Los Alamos National Laboratory

  10. Independent Oversight Review, Hanford Waste Treatment and Immobilizati...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 2014 Independent Oversight Review, Hanford Waste Treatment and Immobilization Plant - March 2014 March 2014 Review of the Hanford Site Waste Treatment and Immobilization...

  11. Independent Oversight Review, Hanford Site CH2M Hill Plateau...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CH2M Hill Plateau Remediation Company - November 2012 Independent Oversight Review, Hanford Site CH2M Hill Plateau Remediation Company - November 2012 November 2012 Review of the...

  12. Independence Power and Light- New Homes Rebate Program

    Broader source: Energy.gov [DOE]

    Independence Power and Light offers rebates to builders for constructing new, energy efficient homes which meet ENERGY STAR standards. Builders who meet ENERGY STAR standards and install specified...

  13. Independent Oversight Assessment, Y-12 National Security Complex...

    Office of Environmental Management (EM)

    Y-12 National Security Complex - June 2012 Independent Oversight Assessment, Y-12 National Security Complex - June 2012 June 2012 Assessment of Nuclear Safety Culture at the Y-12...

  14. Savannah River Site - Salt Waste Processing Facility Independent...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Savannah River Site - Salt Waste Processing Facility Independent Technical Review Full Document and Summary Versions are available for download PDF icon Savannah River Site - Salt ...

  15. Optimal Scheduling of In-situ Analysis Workflows and Independent...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Optimal Scheduling of In-situ Analysis Workflows and Independent Parallel IO Streams for Large-scale Scientific Simulations Event Sponsor: Argonne Leadership Computing Facility...

  16. Iowa Office of Energy Independence | Open Energy Information

    Open Energy Info (EERE)

    navigation, search Name: Iowa Office of Energy Independence Place: Des Moines, Iowa Zip: IA 50319 Product: In 2007, Governor Culver and the Iowa State Legislature created the...

  17. Independent Oversight Evaluation of Line Self-Assessments of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Evaluation of Line Self-Assessments of Safety Conscious Work Environment - February 2014 Independent Oversight Evaluation of Line Self-Assessments of Safety Conscious Work...

  18. Independent Oversight Inspection, Y-12 National Security Complex...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Oversight Inspection, Y-12 National Security Complex - June 2008 June 2008 Inspection of Environment, Safety, and Health Programs at the Y-12 National Security Complex ...

  19. Independent Oversight Review of DOE Headquarters Emergency Response...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 26, 2003 The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted a review of emergency response plans and performance at DOE ...

  20. Distributed Hydrogen Production from Natural Gas: Independent Review

    SciTech Connect (OSTI)

    Fletcher, J.; Callaghan, V.

    2006-10-01

    Independent review report on the available information concerning the technologies needed for forecourts producing 150 kg/day of hydrogen from natural gas.

  1. Independent Oversight Activity Report, Office of River Protection...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of River Protection - May 2013 Independent Oversight Activity Report, Office of River Protection - May 2013 May 2013 Operational Awareness Visit at the Office of River...

  2. Independent Activity Report, Office of River Protection Waste...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of River Protection Waste Treatment Plant and Tank Farms - February 2013 Independent Activity Report, Office of River Protection Waste Treatment Plant and Tank Farms - February...

  3. Independent Oversight Review, Hanford Tank Farms - December 2012...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - December 2012 December 2012 Review of the Hanford Tank Farms Radiological Controls Activity-Level Implementation This report documents an independent review by the Office of...

  4. Independent Oversight Activity Report, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    November 2013 Independent Oversight Activity Report, Los Alamos National Laboratory - November 2013 November 2013 Follow-up on the Progress and Issues in the Implementation of the...

  5. Independent Oversight Activity Report, Hanford Waste Tank Farms...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Tank Farms - October 28 - November 6, 2013 Independent Oversight Activity Report, Hanford Waste Tank Farms - October 28 - November 6, 2013 February 2014 Follow-up on Previously...

  6. Independent Activity Report, Pantex Plant - November 2012 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    November 2012 Independent Activity Report, Pantex Plant - November 2012 November 2012 Pantex Plant Operational Awareness Site Visit HIAR PTX-2012-11-08 This report documents the...

  7. Independent Analysis of Alternatives for Disposition of the Idaho...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Analysis of Alternatives for Disposition of the Idaho Calcined High-Level ... The scope of the CDP includes the design and construction of a capability for retrieval ...

  8. High Temperature Membrane with HUmidification-Independent Cluster...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    High Temperature Membrane with HUmidification-Independent Cluster Structure A presentation ... More Documents & Publications High Temperature Membrane Working Group New Proton ...

  9. Independent Oversight Review, Hanford Site Waste Treatment and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste Treatment and Immobilization Plant, August 2013 Independent Oversight Review, Hanford Site Waste Treatment and Immobilization Plant, August 2013 August 2013 Review of the ...

  10. Independent Oversight Review, Savannah River Site Tritium Facilities...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independentreview of preparedness for severe ...

  11. Independent Oversight Review, Hanford Site Tank Farms 222-S Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the implementation of the electrical safety management program (SMP) at the ...

  12. Independent Oversight Review, Portsmouth/Paducah Project Office...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This report provides the results of an independent review of the Department of Energy's ... The independentreview was performed January 31 - February 2, 2012, by the DOE Office of ...

  13. Independence Power and Light- Residential Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Independence Power and Light (IPL) offers rebates to residential customers for purchasing new, energy efficient appliances. Rebates are available on central air conditioning systems, heat pumps,...

  14. Independent Oversight Follow-up Review of Activity Level Implementatio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Although the computer station is located within the posted contamination area, this is a ... were jointly witnessed by Independent Oversight and a DOE-ID MFC Facility Representative. ...

  15. Independent Oversight Special Review, Department of Energy sites...

    Office of Environmental Management (EM)

    of Energy sites - February 2008 February 2008 Independent Oversight Special Review of Workplace Exposure Monitoring This report provides the results of a Special Review of...

  16. Independent Activity Report, Portsmouth/Paducah Project Office...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Activity Report, PortsmouthPaducah Project Office - April 2013 April 2003 Operational Awareness Oversight of the PortsmouthPaducah Project Office (PPPO) Performance ...

  17. Independent Oversight Inspection, DOE RAP Regions - April 2006...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE RAP Regions - April 2006 Independent Oversight Inspection, DOE RAP Regions - April 2006 April 2006 Inspection of the Radiological Assistance Program This report provides the ...

  18. Systems and Methods for Cylindrical Hall Thrusters with Independently...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Systems and Methods for Cylindrical Hall Thrusters with Independently Controllable Ionization and Acceleration Stages Yevgeny Raitses, Nathaniel J. Fisch and Kevin D. Diamant (The...

  19. Independent Oversight Review, Waste Isolation Pilot Plant - November...

    Office of Environmental Management (EM)

    Independent Oversight Review, Waste Isolation Pilot Plant - November 2012 November 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Waste Isolation Pilot ...

  20. Independent Oversight Follow-up Assessment of Safety Culture...

    Office of Environmental Management (EM)

    Independent Oversight Follow-up Assessment of Safety Culture at the Waste Treatment and ... Assessment of Safety Culture at the Waste Treatment and Immobilization Plant Table ...

  1. Independent Activity Report, Savannah River Site - March 2013...

    Office of Environmental Management (EM)

    The Independent Oversight Site Lead for the Savannah River Site traveled to the site to work with functional area managers to schedule nuclear safety oversight activities. The Site ...

  2. Independent Activity Report, Pantex Plant - October 2011 | Department...

    Office of Environmental Management (EM)

    Activity Report, Pantex Plant - October 2011 October 2011 Pantex Plant Operational Awareness Site Visit HIAR PTX-2011-10-28 This Independent Activity Report documents an...

  3. Independent Oversight Inspection, Y-12 National Security Complex...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Complex, Volume I - September 2005 Independent Oversight Inspection, Y-12 National Security Complex, Volume I - September 2005 September 2005 Inspection of Environment, Safety, and...

  4. Independent Oversight Targeted Review, Y-12 National Security...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Y-12 National Security Complex - February 2012 Independent Oversight Targeted Review, Y-12 National Security Complex - February 2012 February 2012 Targeted Review of Site...

  5. Independent Oversight Appraisal, Y-12 National Security Complex...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appraisal, Y-12 National Security Complex - May 2013 Independent Oversight Appraisal, Y-12 National Security Complex - May 2013 May 2013 Appraisal of the Uranium Processing...

  6. Independent Activity Report, Los Alamos National Security - June...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Activity Report, Los Alamos National Security - June 2011 June 2011 Review of the Los Alamos National Security Emergency Operations Division Emergency Management ...

  7. Secretary of Energy Moniz discusses Iowa's role in energy independence...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Secretary of Energy Moniz discusses Iowa's role in energy independence Ames Tribune staff writer Austin Harrington sat down with Energy Secretary Ernest Moniz on Friday to talk ...

  8. Two Independent Assessments Find the Department of Energy's Yucca...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... For more information on the Yucca Mountain Project and a copy of the independent assessments visit the Office of Civilian Radioactive Waste Management. Media contact(s): Allen ...

  9. Independent Oversight Activity Report, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Los Alamos National Laboratory - February 12, 2014 Independent Oversight Activity Report, Los Alamos National Laboratory - February 12, 2014 February 2014 Review of Corrective ...

  10. Independent Oversight Assessment of the Nuclear Safety Culture...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Health, Safety and Security HSS Independent Oversight Assessment of Nuclear Safety Culture and Management of Nuclear Safety ... EM Office of Environmental Management EM-1 ...

  11. Distributed Hydrogen Production from Natural Gas: Independent Review Panel Report

    Broader source: Energy.gov [DOE]

    Independent review report on the available information concerning the technologies needed for forecourts producing 150 kg/day of hydrogen from natural gas.

  12. Independent Oversight Follow-up Assessment of Safety Culture...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment of Safety Culture at the Waste Treatment and Immobilization Plant - June 2014 Independent Oversight Follow-up Assessment of Safety Culture at the Waste Treatment and...

  13. Independent Oversight Special Review, Rocky Flats Closure Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rocky Flats Closure Project Site - April 2001 Independent Oversight Special Review, Rocky Flats Closure Project Site - April 2001 April 2001 Special Review of the Rocky Flats...

  14. Independent Oversight Review, Hanford Site Waste Treatment and...

    Energy Savers [EERE]

    Waste Treatment and Immobilization Plant - June 2014 Independent Oversight Review, Hanford Site Waste Treatment and Immobilization Plant - June 2014 June 2014 Review of the Hanford ...

  15. Independent Oversight Review, Savannah River Site Salt Waste...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 2013 Independent Oversight Review, Savannah River Site Salt Waste Processing Facility - August 2013 August 2013 Review of the Savannah River Site Salt Waste Processing...

  16. Independent Oversight Review, Waste Isolation Pilot Plant - April...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 2013 Independent Oversight Review, Waste Isolation Pilot Plant - April 2013 April 2013 Review of the Waste Isolation Pilot Plant Work Planning and Control Activities The...

  17. Independent Oversight Activity Report for Review of Corrective...

    Office of Environmental Management (EM)

    of radiological posting and labeling, proper personal protective equipment doffing and contamination control, and response to abnormal operations. Result: Independent Oversight...

  18. Independent Oversight Review, Los Alamos Site Office - March...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site Office - March 2012 Independent Oversight Review, Los Alamos Site Office - March 2012 March 2012 Review of the Los Alamos Site Office Safety System Oversight Program ...

  19. Workplace Charging Challenge Partner: Odell Brewing Co.

    Broader source: Energy.gov [DOE]

    Joined the Challenge: November 2014Headquarters: Fort Collins, COCharging Location: Fort Collins, CODomestic Employees: 110

  20. The solar energy challengeSeth Darling

    SciTech Connect (OSTI)

    Seth Darling

    2012-08-08

    Argonne researcher Seth Darling talks about the solar energy challenge in creating alternative sources of energy

  1. Workplace Charging Challenge Partner: E Source

    Broader source: Energy.gov [DOE]

    Joined the Challenge: December 2015Headquarters: Boulder, COCharging Location: Boulder, CODomestic Employees: 92

  2. Workplace Charging Challenge Partner: World Wildlife Fund

    Broader source: Energy.gov [DOE]

    Joined the Challenge: April 2014Headquarters: Washington, DCCharging Location: Washington, DCDomestic Employees: 470

  3. Workplace Charging Challenge Partner: Vernier Software & Technology

    Broader source: Energy.gov [DOE]

    Joined the Challenge: June 2015Headquarters: Beaverton, ORCharging Location: Beaverton, ORDomestic Employees: 105

  4. Workplace Charging Challenge Partner: Duke Energy

    Broader source: Energy.gov [DOE]

    Joined the Challenge: January 2013Headquarters: Charlotte, NCCharging Locations: N/ADomestic Employees: 27,000

  5. Workplace Charging Challenge Partner: Thomas College

    Broader source: Energy.gov [DOE]

    Joined the Challenge: June 2015Headquarters: Waterville, MECharging Location: Waterville, MEDomestic Employees: 150

  6. Workplace Charging Challenge Partner: EV Connect

    Broader source: Energy.gov [DOE]

    Joined the Challenge: January 7, 2015Headquarters: Los Angeles, CACharging Location: Los Angeles, CADomestic Employees: 20

  7. The solar energy challenge?Seth Darling

    ScienceCinema (OSTI)

    Seth Darling

    2013-06-05

    Argonne researcher Seth Darling talks about the solar energy challenge in creating alternative sources of energy

  8. Workplace Charging Challenge Partner: Phil Haupt Electric

    Broader source: Energy.gov [DOE]

    Joined the Challenge: March 2014Headquarters: Roseville, CACharging Location: Roseville, CADomestic Employees: 5

  9. Workplace Charging Challenge Partner: Alliant Energy

    Broader source: Energy.gov [DOE]

    Joined the Challenge: March 2016Headquarters: Madison, WICharging Locations: Madison, WIDomestic Employees: 4,000

  10. Workplace Charging Challenge Partner: University of Minnesota

    Broader source: Energy.gov [DOE]

    Joined the Challenge: April 2016Headquarters: Minneapolis, MNCharging Location: Minneapolis, MNDomestic Employees: 23,000

  11. Workplace Charging Challenge Partner: City of Sacramento

    Office of Energy Efficiency and Renewable Energy (EERE)

    Joined the Challenge: February 2013Headquarters: Sacramento, CACharging Location: Sacramento, CADomestic Employees: 3,792

  12. Workplace Charging Challenge Partner: Boise State University

    Broader source: Energy.gov [DOE]

    Joined the Challenge: June 2016Headquarters: Boise, IDCharging Location: Boise, IDDomestic Employees: 2,200

  13. Workplace Charging Challenge Partner: Melink Corporation

    Broader source: Energy.gov [DOE]

    Joined the Challenge: July 2014Headquarters: Milford, OHCharging Locations: Milford, OHDomestic Employees: 80

  14. Workplace Charging Challenge Partner: Heartland Community College

    Office of Energy Efficiency and Renewable Energy (EERE)

    Joined the Challenge: June 2014Headquarters: Normal, ILCharging Location: Normal, ILDomestic Employees: 872

  15. Workplace Charging Challenge Partner: Common Media

    Broader source: Energy.gov [DOE]

    Joined the Challenge: March 2016Headquarters: Hadley, MACharging Location: Hadley, MADomestic Employees: 18

  16. Workplace Charging Challenge Partner: Swarthmore College

    Broader source: Energy.gov [DOE]

    Joined the Challenge: November 2015Headquarters: Swarthmore, PACharging Location: Swarthmore, PADomestic Employees: 1,135

  17. Using time separation of signals to obtain independent proton and antiproton beam position measurements around the Tevatron

    SciTech Connect (OSTI)

    Webber, R.; /Fermilab

    2005-05-01

    Independent position measurement of the counter-circulating proton and antiproton beams in the Tevatron, never supported by the original Tevatron Beam Position Monitor (BPM) system, presents a challenge to upgrading that system. This paper discusses the possibilities and complications of using time separation of proton and antiproton signals at the numerous BPM locations and for the dynamic Tevatron operating conditions. Results of measurements using one such method are presented.

  18. Energy Efficiency: Challenges and Progress

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Efficiency: Challenges and Progress State Energy Advisory Board Meeting June 7, 2011 2 | Energy Efficiency and Renewable Energy eere.energy.gov EE Priorities Spend ARRA funding quickly & effectively Build EE infrastructure for longer term (post Recovery Act) Take EE to scale & create a new EE economy * Federal Policies * R&D * Test procedures / Appliance Standards * Support ENERGY STAR * EE markets/services * Residential Retrofits * Commercial Retrofits * Industrial

  19. lightsource_data_challenge-analysis

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Source Data Analysis & Simulation: The Data Challenge Alexander Hexemer (ALS), Xiaoye Li (CRD), Stefano Marchesini (ALS), Dilworth Parkinson (ALS), Nobumichi Tamura (ALS), Craig E. Tull (CRD) Advanced Light Source, LBNL; Computing Research Division, LBNL BES facilities (Light Sources and Neutron Sources) serve ~10,000 researchers per year. Recent improvements in detector speed and light source luminosity are yielding unprecedented data rates which exceed the capabilities of most data

  20. Hypervolume visualization: a challenge in simplicity

    SciTech Connect (OSTI)

    Bajaj, C.L.; Pascucci, V.; Rabbiolo, G.; Schikore, D.R.

    1998-09-22

    Hyper-volume visualization is designed to provide simple and fully explanatory images that give comprehensive insights into the global structure of scalar fields of any dimension. The basic idea is to have a dimension independent viewing system that scales nicely with the geometric dimension of the dataset and that can be combined with classical approaches like isocontouring and animation of slices of n.D data. We completely abandon (for core simplicity) rendering techniques, such as hidden surface removal or lighting or radiosity, that enhance three dimensional realism and concentrate on the real-time display of images that highlight structural (topological) features of the nD dataset (holes, tunnels, cavities, depressions, extrema, etc). Hyper-volume visualization on the one hand is a generalization of direct parallel projection methods in volume rendering. To achieve efficiency (and real-time performance on a graphics workstation) we combine the advantages of (i) a hierarchical representations of the hyper-volume data for multiresolution display and (ii) generalized object space splatting combined with texture-mapped graphics hardware acceleration. The development of a system that implements display techniques for multidimensional datasets requires careful design of both algorithms and user interfaces that scale linearly with the dimension n of the input geometric space. This is a major challenge since straightforward generalizations of standard techniques that are suitable for display of 3D data yield exceedingly intricate interfaces. For example, a view manipulation graphical user interface is usually based on a rotation of the object about Cartesian rotation axes, with possibly unit quaternions internal representations for the rotation group. Unfortunately the number of independent rotation axes grows quadratically with dimension(three in 3D to six in 4D to ten in 5D to fifteen in 6D space). Going back to the basics of parallel projections, we

  1. challenges | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Challenges/Shortages Facts/Issues Average South-Central natural gas consumption in 2005 was: 13.9% gas utility 20.0% power generation 54.3% industrial-LNG sales, oil refining, and fertilizer manufacturing 7.2% field operations 4.6% other Due to a lack of natural gas deliverability, the Cook Inlet fertilizer plant terminated operations in May 2008. LNG sales are increasingly curtailed during cold weather due to peak demand shortages. The LNG export license is up for renewal in 2011. Exploration

  2. Addressing the workforce pipeline challenge

    SciTech Connect (OSTI)

    Leonard Bond; Kevin Kostelnik; Richard Holman

    2006-11-01

    A secure and affordable energy supply is essential for achieving U.S. national security, in continuing U.S. prosperity and in laying the foundations to enable future economic growth. To meet this goal the next generation energy workforce in the U.S., in particular those needed to support instrumentation, controls and advanced operations and maintenance, is a critical element. The workforce is aging and a new workforce pipeline, to support both current generation and new build has yet to be established. The paper reviews the challenges and some actions being taken to address this need.

  3. EV Everywhere Grand Challenge Blueprint

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    above" energy strategy, President Obama issued the EV Everywhere Grand Challenge to the nation in March 2012 with the bold goal to enable plug-in electric vehicles (PEVs) that are as affordable and convenient for the American family as gasoline-powered vehicles by 2022. I am more convinced now than ever that we can capture this opportunity, and I am committed to making the strategic investments necessary to get there. These investments will: 1) improve the competitive position of U.S.

  4. Multiphysics simulations: challenges and opportunities.

    SciTech Connect (OSTI)

    Keyes, D.; McInnes, L. C.; Woodward, C.; Gropp, W.; Myra, E.; Pernice, M.

    2012-11-29

    This report is an outcome of the workshop Multiphysics Simulations: Challenges and Opportunities, sponsored by the Institute of Computing in Science (ICiS). Additional information about the workshop, including relevant reading and presentations on multiphysics issues in applications, algorithms, and software, is available via https://sites.google.com/site/icismultiphysics2011/. We consider multiphysics applications from algorithmic and architectural perspectives, where 'algorithmic' includes both mathematical analysis and computational complexity and 'architectural' includes both software and hardware environments. Many diverse multiphysics applications can be reduced, en route to their computational simulation, to a common algebraic coupling paradigm. Mathematical analysis of multiphysics coupling in this form is not always practical for realistic applications, but model problems representative of applications discussed herein can provide insight. A variety of software frameworks for multiphysics applications have been constructed and refined within disciplinary communities and executed on leading-edge computer systems. We examine several of these, expose some commonalities among them, and attempt to extrapolate best practices to future systems. From our study, we summarize challenges and forecast opportunities. We also initiate a modest suite of test problems encompassing features present in many applications.

  5. BIOENERGIZEME INFOGRAPHIC CHALLENGE: What is Biogas?

    Broader source: Energy.gov [DOE]

    This infographic was created by students from Sparks HS in Sparks, NV, as part of the U.S. Department of Energy-BioenergizeME Infographic Challenge. The BioenergizeME Infographic Challenge...

  6. 2016 Bioenergizeme Infographic Challenge: Algae Biofuel

    Office of Energy Efficiency and Renewable Energy (EERE)

    This infographic was created by students from Sparks High School in Sparks, NV, as part of the U.S. Department of Energy-BioenergizeME Infographic Challenge. The BioenergizeME Infographic Challenge...

  7. BIOENERGIZEME INFOGRAPHIC CHALLENGE: What is Biomass?

    Broader source: Energy.gov [DOE]

    This infographic was created by students from Sparks HS in Sparks, NV, as part of the U.S. Department of Energy-BioenergizeME Infographic Challenge. The BioenergizeME Infographic Challenge...

  8. BIOENERGIZEME INFOGRAPHIC CHALLENGE: Biomass Reduces Carbon Dioxide

    Broader source: Energy.gov [DOE]

    This infographic was created by students from Sparks HS in Sparks, NV, as part of the U.S. Department of Energy-BioenergizeME Infographic Challenge. The BioenergizeME Infographic Challenge...

  9. Workshop: Systems Integration Vision Challenges and Opportunities...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Systems Integration Vision Challenges and Opportunities Workshop: Systems Integration Vision Challenges and Opportunities May 22, 2014 2:30PM to 5:30PM PDT Pacific A Even after ...

  10. BIOENERGIZEME INFOGRAPHIC CHALLENGE: Iowa Ethanol Production

    Broader source: Energy.gov [DOE]

    This infographic was created by students from Sparks HS in Sparks, NV, as part of the U.S. Department of Energy-BioenergizeME Infographic Challenge. The BioenergizeME Infographic Challenge...

  11. 2016 Bioenergizeme Infographic Challenge: Education in Bioenergy |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Education in Bioenergy 2016 Bioenergizeme Infographic Challenge: Education in Bioenergy 2016 Bioenergizeme Infographic Challenge: Education in Bioenergy This infographic was created by students from Smithtown High School East in St. James, NY

  12. Breakout Session: Solar Securitization: Opportunities and Challenges...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solar Securitization: Opportunities and Challenges Breakout Session: Solar Securitization: Opportunities and Challenges May 21, 2014 6:30PM to 7:30PM PDT Avila A & B The U.S. solar ...

  13. Data Challenge | OpenEI Community

    Open Energy Info (EERE)

    NickL(137) Contributor 5 May, 2015 - 15:37 DOE Leading by Example with Green Button, American Energy Data Challenge contest 4 contest Data Challenge Green Button DOE will launch...

  14. Challenge Home Events | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Sorted By Date Sort By Location Sort By Event Description Contact TBA West Chester, Pennsylvania DOE Challenge Home Zero Net-Energy-Ready Home Training DOE Challenge Home is...

  15. BIOENERGIZEME INFOGRAPHIC CHALLENGE: History of Bioenergy

    Broader source: Energy.gov [DOE]

    This infographic was created by students from Troy High School in Troy, MI, as part of the U.S. Department of Energy-BioenergizeME Infographic Challenge. The BioenergizeME Infographic Challenge...

  16. BIOENERGIZEME INFOGRAPHIC CHALLENGE: History of Biomass

    Broader source: Energy.gov [DOE]

    This infographic was created by students from Broad Run HS in Ashburn, VA, as part of the U.S. Department of Energy-BioenergizeME Infographic Challenge. The BioenergizeME Infographic Challenge...

  17. VAST Challenge 2014: The Kronos Incident

    SciTech Connect (OSTI)

    Whiting, Mark A.; Cook, Kristin A.; Grinstein, Georges; Liggett, Kristen; Cooper, Michael J.; Fallon, John; Morin, Marc P.

    2014-10-31

    The 2014 IEEE Visual Analytics Science and Technology (VAST) Challenge presented researchers with a single fictitious scenario: the disappearance of staff members of the GASTech oil and gas company on location on the island of Kronos. A group named the Protectors of Kronos (POK) was the prime suspect in the disappearance. Three mini-challenges and a grand challenge were offered. Mini-challenge 1 included multiple types of text data for participants to provide a timeline of key events and characterize the POK, mini-challenge 2 focused on individuals’ movement and financial data for participants to provide patterns of daily life, and mini-challenge 3 featured real-time streaming social media and emergency service data for participants to provide hostage and kidnapper information. The grand challenge asked the participants to integrate results and generate a synopsis of events. The VAST Challenge received 73 submissions from 13 countries

  18. BIOENERGIZEME INFOGRAPHIC CHALLENGE: Bioenergy Through Time

    Broader source: Energy.gov [DOE]

    This infographic was created by students from Robinson HS in Tampa, FL, as part of the U.S. Department of Energy-BioenergizeME Infographic Challenge. The BioenergizeME Infographic Challenge...

  19. BIOENERGIZEME INFOGRAPHIC CHALLENGE: Algae Biofuel | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Algae Biofuel BIOENERGIZEME INFOGRAPHIC CHALLENGE: Algae Biofuel BIOENERGIZEME INFOGRAPHIC CHALLENGE: Algae Biofuel

  20. Overview of IMG Challenges (MICW - Metagenomics Informatics Challenges Workshop: 10K Genomes at a Time)

    ScienceCinema (OSTI)

    Markowitz, Victor [JGI

    2013-01-22

    DOE JGI's Victor Markowitz gives an overview of IMG challenges at the Metagenomics Informatics Challenges Workshop held at the DOE JGI on October 12-13, 2011.

  1. SunShot Rooftop Challenge Awardees

    Broader source: Energy.gov [DOE]

    Awardees, partners, award amounts, estimated population, and project descriptions for the 2011 SunShot Rooftop Challenge.

  2. BIOENERGIZEME INFOGRAPHIC CHALLENGE: Biomass: Types/Characteristics |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Biomass: Types/Characteristics BIOENERGIZEME INFOGRAPHIC CHALLENGE: Biomass: Types/Characteristics BIOENERGIZEME INFOGRAPHIC CHALLENGE: Biomass: Types/Characteristics This infographic was created by students from Albany Academies and Academy of the Holy Names in Albany, NY, as part of the U.S. Department of Energy-BioenergizeME Infographic Challenge. The BioenergizeME Infographic Challenge encourages young people to improve their foundational understanding of bioenergy,

  3. Better Buildings Challenge -- Milwaukee | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Better Buildings Challenge -- Milwaukee Better Buildings Challenge -- Milwaukee The Better Buildings Challenge -- Milwaukee is a comprehensive energy efficiency program that provides all of the tools and resources that building owners and property managers need to effectively develop and implement energy efficiency projects in their buildings. The Better Buildings Challenge -- Milwaukee is a comprehensive energy efficiency program that provides all of the tools and resources that building owners

  4. International Hydrogen Infrastructure Challenges Workshop Summary - NOW,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NEDO, and DOE | Department of Energy Infrastructure Challenges Workshop Summary - NOW, NEDO, and DOE International Hydrogen Infrastructure Challenges Workshop Summary - NOW, NEDO, and DOE Download presentation slides from the DOE Fuel Cell Technologies Office webinar "International Hydrogen Infrastructure Challenges Workshop Summary - NOW, NEDO, and DOE" held on December 16, 2013. International Hydrogen Infrastructure Challenges Workshop Summary - NOW, NEDO, and DOE Webinar Slides

  5. Los Alamos STEM Challenge registration now open

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Los Alamos STEM Challenge registration now open Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue: September 1, 2016 all issues All Issues » submit Los Alamos STEM Challenge registration now open Recognition awaits students who can creatively present the future December 1, 2013 Los Alamos STEM Challenge The Los Alamos STEM Challenge runs from mid December through February 7. Contacts Community Programs Office Director Kurt Steinhaus

  6. Workplace Charging Challenge Partner: Snohomish County

    Broader source: Energy.gov [DOE]

    Joined the Challenge: March 2016Headquarters: Everett, WACharging Locations:Everett, WA; Snohomish, WA; Monroe, WADomestic Employees: 2,500

  7. Workplace Charging Challenge Partner: National Grid

    Office of Energy Efficiency and Renewable Energy (EERE)

    Joined the Challenge: February 2013Headquarters: Waltham, MACharging Locations: Waltham, MA; Worcester, MA; Providence, RIDomestic Employees: 16,600

  8. Workplace Charging Challenge Partner: Utah Paperbox

    Broader source: Energy.gov [DOE]

    Joined the Challenge: May 2014Headquarters: Salt Lake City, UTCharging Location: Salt Lake City, UTDomestic Employees: 220

  9. Research Challenges for Visualization Software. (Journal Article...

    Office of Scientific and Technical Information (OSTI)

    Research Challenges for Visualization Software. Citation ... IEEE Computer Magazine. Research Org: Sandia National Laboratories Sponsoring Org: USDOE National Nuclear Security ...

  10. Workplace Charging Challenge Partner: ABB, Inc.

    Broader source: Energy.gov [DOE]

    Joined the Challenge: June 2013Headquarters: Cary, NCCharging Locations: New Berlin, WI; Raleigh, NC; Houston, TXDomestic Employees: 20,000

  11. Workplace Charging Challenge Partner: Biogen Idec Inc.

    Office of Energy Efficiency and Renewable Energy (EERE)

    Joined the Challenge: February 2013Headquarters: Weston, MACharging Location: Research Triangle Park, NCDomestic Employees: 4,500

  12. Workplace Charging Challenge Partner: Unum Group

    Broader source: Energy.gov [DOE]

    Joined the Challenge: July 2015Headquarters: Chattanooga, TNCharging Locations: Portland, ME; Chattanooga, TNDomestic Employees: 9,600

  13. Workplace Charging Challenge: Sample Workplace Charging Policy

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review the policy guidelines used by one Workplace Charging Challenge partner to keep their program running safe and successfully.

  14. Chapter 1 - Energy Challenges | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - Energy Challenges Chapter 1 - Energy Challenges Chapter 1 - Energy Challenges The United States' energy system, vast in size and increasingly complex, is the engine of the economy. The national energy enterprise has served us well, driving unprecedented economic growth and prosperity and supporting our national security. The U.S. energy system is entering a period of unprecedented change; new technologies, new requirements, and new vulnerabilities are transforming the system. The challenge is

  15. Coverage of Independent Audits of For-Profit Firms

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    COVERAGE OF INDEPENDENT AUDITS FOR OTHER TRANSACTIONS (10 CFR 603) TABLE OF CONTENTS Part 1. ... income? The standards for program income are in section 603.835 of 10 CFR part 603.

  16. Security and Emergency Management Independent Oversight and Performance Assurance Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-03-01

    Establishes the DOE Security and Emergency Management Independent Oversight and Performance Assurance Program. Cancels DOE O 470.2, Paragraph 5b(2) of DOE O 231.1 and Chapter IV of DOE M 231.1-1.

  17. Independent Oversight Review, Idaho Site, March 2013 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site, March 2013 Independent Oversight Review, Idaho Site, March 2013 March 2013 Review of the Facility Representative Program at the Idaho Site The U.S. Department of Energy (DOE)...

  18. Hydrogen Production Cost Estimate Using Biomass Gasification: Independent Review

    Office of Energy Efficiency and Renewable Energy (EERE)

    This independent review report assesses the 2009 state-of-the-art and 2020 projected capital cost, energy efficiency, and levelized cost for hydrogen production from biomass via gasification.

  19. Public Comment re Section 934 of the Energy Independence and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Public Comment by the Uranium Producers of America (UPA) re Section 934 of the Energy Independence and Security Act of 2007 (EISA). The UPA urges DOE to clarify the definition of ...

  20. Independent Activity Report, Pantex Plant - May 2013 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    May 2013 Independent Activity Report, Pantex Plant - May 2013 May 2013 Operational Awareness Oversight of the Pantex Plant HIAR PTX-2013-05-20 This Office of Health, Safety and...

  1. Independent Activity Report, Hanford Tank Farms - April 2013...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Tank Farms - April 2013 Independent Activity Report, Hanford Tank Farms - April 2013 April 2013 Operational Awareness at the Hanford Tank Farms HIAR-HANFORD-2013-04-15 The Office...

  2. Independent Oversight Activity Report, Hanford Tank Farms - March...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 10-12, 2014 Independent Oversight Activity Report, Hanford Tank Farms - March 10-12, 2014 March 10-12, 2014 Hanford Tank Farm Operations HIAR-HANFORD-2014-03-10 This...

  3. Platform-independent method for computer aided schematic drawings

    DOE Patents [OSTI]

    Vell, Jeffrey L.; Siganporia, Darius M.; Levy, Arthur J.

    2012-02-14

    A CAD/CAM method is disclosed for a computer system to capture and interchange schematic drawing and associated design information. The schematic drawing and design information are stored in an extensible, platform-independent format.

  4. Independent Oversight Follow-up Review, Hanford Site - June 2011...

    Broader source: Energy.gov (indexed) [DOE]

    Follow-up Review of the Hanford Site Chronic Beryllium Disease Prevention Program This report provides the results of a follow-up independent oversight review of the Hanford Site...

  5. New Independent Analysis Confirms Climate Bill Costs About a...

    Office of Environmental Management (EM)

    Postage Stamp a Day New Independent Analysis Confirms Climate Bill Costs About a Postage Stamp a Day August 4, 2009 - 12:00am Addthis Washington, D.C. - A new analysis by the ...

  6. The tricarboxylic acid cycle in Shewanella oneidensis is independent...

    Office of Scientific and Technical Information (OSTI)

    of Fur and RyhB control Citation Details In-Document Search Title: The tricarboxylic acid cycle in Shewanella oneidensis is independent of Fur and RyhB control It is well ...

  7. EA-227 New York Independent System Operator Inc | Department...

    Office of Environmental Management (EM)

    EA-227 New York Independent System Operator Inc More Documents & Publications EA-220-A NRG Power Marketing, Inc EA-122-A Dynegy Power Marketing, Inc EA-232 OGE Energy Resources...

  8. Waste Treatment Plant External Independent Review, Office of...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 28, 2016 8:00AM EDT to April 1, 2016 5:00PM EDT External Independent Review (EIR). On March 28 - April 1, the Office of Project Management Oversight and Assessments (PM) will ...

  9. EA-227-A New York Independent System Operator | Department of...

    Office of Environmental Management (EM)

    energy OE docket No. EA-227-A New York Independent System Operator, Inc EA-137-A New York State Electric and Gas Corporation EA-157-A Consolidated Edison Company of New York, Inc...

  10. Builders Challenge Quality Criteria Support Document

    SciTech Connect (OSTI)

    2009-06-01

    This document provides guidance to U.S. home builders participating in Builders Challenge. To qualify for the Builders Challenge, a home must score 70 or less on the EnergySmart Home Scale (E-Scale). Homes also must meet the Builders Challenge Quality Cri

  11. Independent Oversight Focused Review, Kansas City Plant, Summary Report -

    Energy Savers [EERE]

    Department of Energy Savannah River Remediation - July 2010 Independent Activity Report, Savannah River Remediation - July 2010 July 2010 Savannah River Operations Office Integrated Safety Management System Phase II Verification Review of Savannah River Remediation The U.S. Department of Energy (DOE), Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), participated in the DOE Savannah River Operations Office (DOE-SR), Office of Safety and Quality

  12. Independent Oversight Review, Portsmouth/Paducah Project Office - May 2012

    Energy Savers [EERE]

    - January 2012 | Department of Energy Savannah River National Laboratory - January 2012 Independent Oversight Follow-up Review, Savannah River National Laboratory - January 2012 January 2012 Follow-up Review of Implementation Verification Reviews at the Savannah River National Laboratory Savannah River Site This report provides the results of an independent review of the identification and implementation of safety basis hazard controls associated with "flashing spray release"

  13. Small Business Independent Market Research Program | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration | (NNSA) Independent Market Research Program Researching, identifying, and evaluating, high-quality, top-performing, and competitively-priced small business suppliers for NNSA programs is the function of this tool. Once a program requirement is identified, an independent research task is activated to locate top-of-the-line small businesses with capabilities in the specific performance areas. Generally, four steps are taken before the final research results are

  14. The Office of Independent Enterprise Assessments' Office of Enforcement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    convened the 2014 DOE Safety and Security Enforcement Workshop May 13 and 14, 2014 | Department of Energy The Office of Independent Enterprise Assessments' Office of Enforcement convened the 2014 DOE Safety and Security Enforcement Workshop May 13 and 14, 2014 The Office of Independent Enterprise Assessments' Office of Enforcement convened the 2014 DOE Safety and Security Enforcement Workshop May 13 and 14, 2014 June 4, 2014 - 1:53pm Addthis Steve Simonson, Director of the Office of

  15. DOE Seeks Independent Evaluation of Remote-Handled Waste Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Seeks Independent Evaluation Of Remote-Handled Waste Program CARLSBAD, N.M., July 24, 2001 - An independent panel of scientific and engineering experts will convene July 30 in Carlsbad to evaluate U.S. Department of Energy (DOE) plans for managing remote-handled (RH) transuranic (TRU) waste at the Waste Isolation Pilot Plant (WIPP). DOE's Carlsbad Field Office has asked the American Society of Mechanical Engineers and the Institute for Regulatory Science to review its proposed RH-TRU waste

  16. Independent Oversight Assessment, Waste Treatment and Immobilization Plant

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - January 2012 | Department of Energy Assessment, Waste Treatment and Immobilization Plant - January 2012 Independent Oversight Assessment, Waste Treatment and Immobilization Plant - January 2012 January 2012 Assessment of the Nuclear Safety Culture and Management of Nuclear Safety Concerns at the Hanford Site Waste Treatment and Immobilization Plant The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and

  17. Independent Oversight Review, Los Alamos National Laboratory - April 2012 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Los Alamos National Laboratory - April 2012 Independent Oversight Review, Los Alamos National Laboratory - April 2012 April 2012 Review of the Emergency Response Organization at the Los Alamos National Laboratory This report provides the results of an independent review of the Los Alamos National Laboratory emergency response organization program that was conducted February 7-9, 2012, by the Office of Safety and Emergency Management Evaluations within the Department of

  18. Independent Safety Evaluation of the MFF-2 test (HK192)

    SciTech Connect (OSTI)

    Van Keuren, J.C.

    1988-06-01

    This document gives the results of the Independent Safety Evaluation (ISE) of the MFF-2 fuel assembly in accordance with the requirements of EI-501. Information on the test design has been taken from the test documents, but independent calculations of the safety related parameters of the test have been made. This report considers seven basic areas: Technical Specification Considerations, Steady State Operation, Transient Operation, HCDA Considerations, Failure Analyses, Stress and Seismic, Criticality and Test Handling Considerations. 25 refs., 1 fig., 5 tabs.

  19. Independent Activity Report, Richland Operations Office - April 2013 |

    Office of Environmental Management (EM)

    Department of Energy April 2011 Independent Activity Report, Nevada National Security Site - April 2011 April 2011 Nevada National Security Site Operational Readiness Review for the Joint Actinide Shock Physics Experimental Research Facility Restart Pre-visit [HIAR-NNSS-2011-04-28] This Independent Activity Report documents an oversight activity conducted by Office of Health, Safety and Security's (HSS) Office of Safety and Emergency Management Evaluations April 25-28, 2011, at the Nevada

  20. Independent Activity Report, Richland Operations Office - June 2011 |

    Office of Environmental Management (EM)

    Department of Energy June 2011 Independent Activity Report, Richland Operations Office - June 2011 June 2011 Hanford Sludge Treatment Project Review [HIAR-RL-2011-06-17] This Independent Activity Report documents an operational awareness activity conducted by Office of Health, Safety and Security's Office of Safety and Emergency Management Evaluations June 13-17, 2011, at the Sludge Treatment Project at the Department of Energy's (DOE) Hanford Site. The activity consisted of touring project

  1. Independent Oversight Assessment, Los Alamos National Laboratory - April

    Office of Environmental Management (EM)

    HSS Independent Activity Report - Rev. 0 Report Number: HIAR LANL-2014-02-12 Site: Los Alamos National Laboratory (LANL) Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for Review of Corrective Actions for Findings from the Independent Oversight Review of LANL Radiological Controls Activity-Level Implementation (Published November 2013) Dates of Activity : 02/12/2014 Report Preparer: Robert Freeman, Nuclear Engineer Activity

  2. Independent Oversight Inspection, Office of Secure Transportation - March

    Office of Environmental Management (EM)

    Energy Hanford Site - June 2010 Independent Oversight Inspection, Hanford Site - June 2010 June 2010 Inspection of the Hanford Site Chronic Beryllium Disease Prevention Program This report provides the results of an independent inspection of the Hanford Site Chronic Beryllium Disease Prevention Program that was conducted by the U.S. Department of Energy's (DOE) Office of Health, Safety and Security (HSS) in response to concerns raised by external stakeholders regarding the adequacy of the

  3. Independent Oversight Review, Los Alamos National Laboratory - September

    Office of Environmental Management (EM)

    Department of Energy May 2012 Independent Oversight Review, Los Alamos National Laboratory - May 2012 May 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Los Alamos National Laboratory his report provides the results of an independent review of the Los Alamos National Laboratory's preparedness for severe natural phenomena events that was conducted by the U.S. Department of Energy's Office of Health, Safety and Security (HSS) in March 2012. The HSS Office of Safety

  4. Independent Oversight Review, Los Alamos National Laboratory Chemistry and

    Office of Environmental Management (EM)

    Metallurgy Research Facility - January 2012 | Department of Energy Laboratory Chemistry and Metallurgy Research Facility - January 2012 Independent Oversight Review, Los Alamos National Laboratory Chemistry and Metallurgy Research Facility - January 2012 January 2012 Review of the Los Alamos National Laboratory Chemistry and Metallurgy Research Facility Fire Suppression Vital Safety System This report provides the results of an independent review of the Los Alamos National Laboratory's

  5. Independent Activity Report, Richland Operations Office - April 2011 |

    Office of Environmental Management (EM)

    Department of Energy Richland Operations Office - April 2011 Independent Activity Report, Richland Operations Office - April 2011 April 2011 Operational Awareness Review of the Hanford Sludge Treatment Project [HIAR-RL-2011-04-07] This Independent Activity Report documents operational awareness activities conducted by Office of Health, Safety and Security's Office of Safety and Emergency Management Evaluations between November 2010 and April 2011 at the Hanford Site Sludge Treatment Project.

  6. Independent Oversight Inspection, East Tennessee Technology Park, Summary

    Office of Environmental Management (EM)

    - January 2012 | Department of Energy Review, Savannah River National Laboratory - January 2012 Independent Oversight Follow-up Review, Savannah River National Laboratory - January 2012 January 2012 Follow-up Review of Implementation Verification Reviews at the Savannah River National Laboratory Savannah River Site This report provides the results of an independent review of the identification and implementation of safety basis hazard controls associated with "flashing spray

  7. Enforcement Policy Statement Regarding Ratings by CAC Independent Coil Manufacturers

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Enforcement Policy Statement Regarding Ratings by CAC Independent Coil Manufacturers Issued: July 13, 2016 In an exercise of its enforcement discretion, DOE will not seek civil penalties for violations of 10 C.F.R. § 429.16(a)(3)(i) where an independent coil manufacturer (ICM) certifies a basic model of split-system central air conditioner with a representative value that is more efficient than a combination certified by an outdoor unit manufacturer (OUM) containing the same outdoor unit where

  8. Independent Oversight Review, Los Alamos Field Office - March 2014 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Field Office - March 2014 Independent Oversight Review, Los Alamos Field Office - March 2014 March 2014 Review of the Los Alamos Field Office Processes for Laboratory Oversight of Radiological Controls Activity-Level Implementation This report documents the results of an independent oversight review of National Nuclear Security Administration Los Alamos Field Office processes for laboratory oversight of radiological protection program activity-level implementation by Los

  9. Independent Oversight Review, Los Alamos National Laboratory - November

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2013 | Department of Energy National Laboratory - November 2013 Independent Oversight Review, Los Alamos National Laboratory - November 2013 November 2013 Review of the Los Alamos National Laboratory Radiological Controls Activity-Level Implementation This report documents the results of an independent oversight review of radiological protection program activity-level implementation performed by Los Alamos National Security and its subcontractors at Los Alamos National Laboratory, Los Alamos

  10. External Independent Review (EIR) Scoping Meeting Agreement Form |

    Energy Savers [EERE]

    Department of Energy Scoping Meeting Agreement Form External Independent Review (EIR) Scoping Meeting Agreement Form Under DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, the Office of Acquisition and Project Management (OAPM) must perform a Performance Baseline External Independent Review (EIR) prior to Critical Decision (CD) 2, and a Construction/Execution Readiness EIR for all Major System projects prior to CD-3. The EIR Standard Operating Procedures

  11. External Independent Review (EIR) Standard Operating Procedure (SOP) May

    Energy Savers [EERE]

    2016 | Department of Energy Standard Operating Procedure (SOP) May 2016 External Independent Review (EIR) Standard Operating Procedure (SOP) May 2016 The Office of Project Management Oversight and Assessments (PM) performs External Independent Reviews (EIRs) to provide Project Management Executives (PMEs), senior leaders within the Department of Energy (DOE), and Congress an unbiased assessment of whether a capital asset project can be executed within proposed scope, schedule and cost

  12. NERSC Calculations Provide Independent Confirmation of Global Land Warming

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Since 1901 Calculations Provide Independent Confirmation of Global Land Warming Since 1901 NERSC Calculations Provide Independent Confirmation of Global Land Warming Since 1901 September 9, 2013 Contact: Jon Bashor, jbashor@lbl.gov, 510-486-5849 campo.jpg These maps show the changes in air temperatures over land as measured using thermometers (left side) and as calculated by the 20th Century Reanalysis project (left side). While more than 80 percent of the observed variation is captured by

  13. Independent Oversight Review, Hanford Site Waste Treatment and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Immobilization Plant - June 2014 | Department of Energy Waste Treatment and Immobilization Plant - June 2014 Independent Oversight Review, Hanford Site Waste Treatment and Immobilization Plant - June 2014 June 2014 Review of the Hanford Site Waste Treatment and Immobilization Plant Construction Quality This report documents the results of an independent oversight review of selected aspects of construction quality at the Hanford Site Waste Treatment and Immobilization Plant. The review, which

  14. Independent Oversight Review, Idaho Site - November 2012 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Site - November 2012 Independent Oversight Review, Idaho Site - November 2012 November 2012 Review of Radiation Protection Program Implementation at the Idaho Site This report documents an independent review of radiation protection program implementation at the Idaho Site that was conducted by the U.S. Department of Energy's (DOE) Office of Safety and Emergency Management Evaluations, which is within the DOE Office of Health, Safety and Security (HSS). The review was performed

  15. Independent Oversight Review, Livermore Site Office - October 2011 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Livermore Site Office - October 2011 Independent Oversight Review, Livermore Site Office - October 2011 October 2011 Review of Integrated Safety Management System Effectiveness at the Livermore Site Office This report provides the results of an independent oversight review of the effectiveness of the integrated safety management system at the Department of Energy's (DOE) Livermore Site Office. The review was conducted July 11-21, 2011, by the Office of Safety and

  16. Independent Oversight Review, Los Alamos National Laboratory - April 2012 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy April 2012 Independent Oversight Review, Los Alamos National Laboratory - April 2012 April 2012 Review of the Consequence Assessment Program at the Los Alamos National Laboratory This report provides the results of an independent review of the Los Alamos National Laboratory emergency management consequence assessment program that was conducted February 7-9, 2012, by the Office of Safety and Emergency Management Evaluations within the Department of Energy's (DOE) Office

  17. Independent Oversight Review, Los Alamos National Laboratory - December

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2013 | Department of Energy December 2013 Independent Oversight Review, Los Alamos National Laboratory - December 2013 December 2013 Review of the Technical Area 55 Safety Class Fire Suppression System at Los Alamos National Laboratory This report documents the results of an independent oversight review of the Los Alamos National Laboratory (LANL) Technical Area 55 Plutonium Facility safety class fire suppression system (FSS), concurrent with a scheduled Los Alamos Field Office vital safety

  18. Independent Oversight Review, Los Alamos National Laboratory - January 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy January 2013 Independent Oversight Review, Los Alamos National Laboratory - January 2013 January 2013 Review of the Los Alamos National Laboratory Corrective Action Effectiveness Review The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), evaluated the Los Alamos Site Office (LASO) safety system oversight (SSO) assessment of Los Alamos National Laboratory's (LANL) corrective actions to address prior

  19. Independent Oversight Review, Los Alamos National Laboratory - May 2012 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy May 2012 Independent Oversight Review, Los Alamos National Laboratory - May 2012 May 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Los Alamos National Laboratory his report provides the results of an independent review of the Los Alamos National Laboratory's preparedness for severe natural phenomena events that was conducted by the U.S. Department of Energy's Office of Health, Safety and Security (HSS) in March 2012. The HSS Office of Safety

  20. Independent Oversight Review, Nevada National Security Site, December 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy National Security Site, December 2013 Independent Oversight Review, Nevada National Security Site, December 2013 December 2013 Targeted Review of the Safety Significant Blast Door and Special Door Interlock Systems and Review of Federal Assurance Capability at the Nevada National Security Site This report documents the results of an independent oversight review of safety significant Blast Door Interlock and Special Door Interlock systems at the Nevada National Security