Note: This page contains sample records for the topic "increased maintenance costs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Turfgrass: Maintenance Costs in Texas.  

E-Print Network [OSTI]

LAW FOR VARIOUS M-AINTENANCE ITEMS BASED ON O\\!'\\'S. ERSHIP AND TYPE OF GRASS WITHIN EACH REGION Maintenance items TY PC Percent Lot size, Region of oz;r- of lawns square Com~osty Fertilizer Chemicals Water Average grass in region feet cost cost... LAW FOR VARIOUS M-AINTENANCE ITEMS BASED ON O\\!'\\'S. ERSHIP AND TYPE OF GRASS WITHIN EACH REGION Maintenance items TY PC Percent Lot size, Region of oz;r- of lawns square Com~osty Fertilizer Chemicals Water Average grass in region feet cost cost...

Holt, Ethan C.; Allen, W. Wayne; Ferguson, Marvin H.

1964-01-01T23:59:59.000Z

2

Maintenance cost studies of present aircraft subsystems  

E-Print Network [OSTI]

This report describes two detailed studies of actual maintenance costs for present transport aircraft. The first part describes maintenance costs for jet transport aircraft broken down into subsystem costs according to an ...

Pearlman, Chaim Herman Shalom

1966-01-01T23:59:59.000Z

3

Facilities Cost Pool: Maintenance Service Responsibilities  

E-Print Network [OSTI]

C 16 EXTERIOR LANDSCAPING University Standard FM FM C 17 EXTERIOR STD BUILDING SIGNS FM FM FM FM FMD 22 DATA POINT MONITORING Environmental building standard FM FM C Cost Pool: Maintenance Service Responsibilities 2 Table of Contents 3 Building Shell

Gulliver, Robert

4

Simple Maintenance Saves Costly Furnace Repair/Replacement | Department of  

Broader source: Energy.gov (indexed) [DOE]

Simple Maintenance Saves Costly Furnace Repair/Replacement Simple Maintenance Saves Costly Furnace Repair/Replacement Simple Maintenance Saves Costly Furnace Repair/Replacement January 6, 2010 - 8:26am Addthis Chris Stewart Senior Communicator at DOE's National Renewable Energy Laboratory For the past few weeks, my forced-air gas furnace has been on the fritz. I blame this on the fact that I haven't been as diligent as I should have been with regular furnace maintenance, which includes: Checking the condition of the vent connection pipe and chimney Checking the physical integrity of the heat exchanger Adjusting the controls to provide optimum water and air temperature settings for both efficiency and comfort Having a technician perform a combustion-efficiency test Checking the combustion chamber for cracks. Testing for carbon monoxide

5

An integrated cost model for production scheduling and perfect maintenance  

Science Journals Connector (OSTI)

Production scheduling deals with scheduling production jobs on a machine (single or multiple) in order to optimise a specific objective such as total weighted completion times or total weighted tardiness. The assumption that machines are always available for processing jobs is generally used in the production scheduling literature. In reality, machines often are unavailable due to preventive maintenance activities or machine failure. Production scheduling and preventive maintenance planning are interrelated, but are most often treated separately. This interdependency seems to be overlooked in the literature. This work integrates, simultaneously, the decisions of preventive maintenance and job order sequencing for a single machine. The objective is to find the job order sequence and maintenance decisions that would minimise the expected cost.

Laith A. Hadidi; Umar M. Al-Turki; M. Abdur Rahim

2011-01-01T23:59:59.000Z

6

Definition: Reduced T&D Equipment Maintenance Cost | Open Energy  

Open Energy Info (EERE)

T&D Equipment Maintenance Cost T&D Equipment Maintenance Cost Jump to: navigation, search Dictionary.png Reduced T&D Equipment Maintenance Cost The cost of sending technicians into the field to check equipment condition is high. Moreover, to ensure that they maintain equipment sufficiently, and identify failure precursors, some utilities may conduct equipment testing and maintenance more often than is necessary. Online diagnosis and reporting of equipment condition would reduce or eliminate the need to send people out to check equipment resulting in a cost savings.[1] References ↑ SmartGrid.gov 'Description of Benefits' An LikeLike UnlikeLike You like this.Sign Up to see what your friends like. inline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Reduced_T%26D_Equipment_Maintenance_Cost&oldid=417296"

7

Wind turbine reliability : understanding and minimizing wind turbine operation and maintenance costs.  

SciTech Connect (OSTI)

Wind turbine system reliability is a critical factor in the success of a wind energy project. Poor reliability directly affects both the project's revenue stream through increased operation and maintenance (O&M) costs and reduced availability to generate power due to turbine downtime. Indirectly, the acceptance of wind-generated power by the financial and developer communities as a viable enterprise is influenced by the risk associated with the capital equipment reliability; increased risk, or at least the perception of increased risk, is generally accompanied by increased financing fees or interest rates. Cost of energy (COE) is a key project evaluation metric, both in commercial applications and in the U.S. federal wind energy program. To reflect this commercial reality, the wind energy research community has adopted COE as a decision-making and technology evaluation metric. The COE metric accounts for the effects of reliability through levelized replacement cost and unscheduled maintenance cost parameters. However, unlike the other cost contributors, such as initial capital investment and scheduled maintenance and operating expenses, costs associated with component failures are necessarily speculative. They are based on assumptions about the reliability of components that in many cases have not been operated for a complete life cycle. Due to the logistical and practical difficulty of replacing major components in a wind turbine, unanticipated failures (especially serial failures) can have a large impact on the economics of a project. The uncertainty associated with long-term component reliability has direct bearing on the confidence level associated with COE projections. In addition, wind turbine technology is evolving. New materials and designs are being incorporated in contemporary wind turbines with the ultimate goal of reducing weight, controlling loads, and improving energy capture. While the goal of these innovations is reduction in the COE, there is a potential impact on reliability whenever new technologies are introduced. While some of these innovations may ultimately improve reliability, in the short term, the technology risks and the perception of risk will increase. The COE metric used by researchers to evaluate technologies does not address this issue. This paper outlines the issues relevant to wind turbine reliability for wind turbine power generation projects. The first sections describe the current state of the industry, identify the cost elements associated with wind farm O&M and availability and discuss the causes of uncertainty in estimating wind turbine component reliability. The latter sections discuss the means for reducing O&M costs and propose O&M related research and development efforts that could be pursued by the wind energy research community to reduce COE.

Not Available

2004-11-01T23:59:59.000Z

8

High Performance Without Increased Cost: Urbane Homes, Louisville...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

High Performance Without Increased Cost: Urbane Homes, Louisville, KY - Building America Top Innovation High Performance Without Increased Cost: Urbane Homes, Louisville, KY -...

9

Metal and Glass Manufacturers Reduce Costs by Increasing Energy...  

Broader source: Energy.gov (indexed) [DOE]

Metal and Glass Manufacturers Reduce Costs by Increasing Energy Efficiency in Process Heating Systems Metal and Glass Manufacturers Reduce Costs by Increasing Energy Efficiency in...

10

Wind turbine reliability :understanding and minimizing wind turbine operation and maintenance costs.  

SciTech Connect (OSTI)

Wind turbine system reliability is a critical factor in the success of a wind energy project. Poor reliability directly affects both the project's revenue stream through increased operation and maintenance (O&M) costs and reduced availability to generate power due to turbine downtime. Indirectly, the acceptance of wind-generated power by the financial and developer communities as a viable enterprise is influenced by the risk associated with the capital equipment reliability; increased risk, or at least the perception of increased risk, is generally accompanied by increased financing fees or interest rates. This paper outlines the issues relevant to wind turbine reliability for wind turbine power generation projects. The first sections describe the current state of the industry, identify the cost elements associated with wind farm O&M and availability and discuss the causes of uncertainty in estimating wind turbine component reliability. The latter sections discuss the means for reducing O&M costs and propose O&M related research and development efforts that could be pursued by the wind energy research community to reduce cost of energy.

Walford, Christopher A. (Global Energy Concepts. Kirkland, WA)

2006-03-01T23:59:59.000Z

11

Optimization of Electricity and Server Maintenance Costs in Hybrid Cooling Data Centers  

Science Journals Connector (OSTI)

The electricity cost of data centers dominated by server power and cooling power is growing rapidly. To tackle this problem, inlet air with moderate temperature and server consolidation are widely adopted. However, the benefit of these two methods is ... Keywords: Data centers, electricity cost, server maintenance cost, joint optimization

Shaoming Chen; Yue Hu; Lu Peng

2013-06-01T23:59:59.000Z

12

Stochastic Modeling of Future Highway Maintenance Costs for Flexible Type Highway Pavement Construction Projects  

E-Print Network [OSTI]

that affect pavement performances; 2) develop a stochastic model that predicts future maintenance costs of flexible-type pavement in Texas. The study data were gathered through the Pavement Management Information System (PMIS) containing more than 190...

Kim, Yoo Hyun

2012-07-16T23:59:59.000Z

13

Constrained-cost maintenance and measurability of degradation  

Science Journals Connector (OSTI)

......the timing problem of when to repair and the neural net handles which bridges in the net- work to repair. MAINTENANCE AND MEASURABILITY...track, bridge, or stretch of pipeline--is classified as being...chosen one of a finite set R of repair actions. The transition probability......

J. I. ANSELL; T. W. ARCHIBALD; L. C. THOMAS

1998-03-01T23:59:59.000Z

14

ANALYSIS OF SAFETY RELIEF VALVE PROOF TEST DATA TO OPTIMIZE LIFECYCLE MAINTENANCE COSTS  

SciTech Connect (OSTI)

Proof test results were analyzed and compared with a proposed life cycle curve or hazard function and the limit of useful life. Relief valve proof testing procedures, statistical modeling, data collection processes, and time-in-service trends are presented. The resulting analysis of test data allows for the estimation of the PFD. Extended maintenance intervals to the limit of useful life as well as methodologies and practices for improving relief valve performance and reliability are discussed. A generic cost-benefit analysis and an expected life cycle cost reduction concludes that $90 million maintenance dollars might be avoided for a population of 3000 valves over 20 years.

Gross, Robert; Harris, Stephen

2007-08-01T23:59:59.000Z

15

Rain increases the energy cost of bat flight  

Science Journals Connector (OSTI)

...properly cited. Rain increases the energy cost of bat flight Christian C. Voigt...moistening of their body inflicts energy costs on flight by reducing lift and...test the idea that rain imposes energy costs on flying bats. We quantified...

2011-01-01T23:59:59.000Z

16

Will 10 MW Wind Turbines Bring Down the Operation and Maintenance Cost of Offshore Wind Farms?  

Science Journals Connector (OSTI)

Abstract Larger wind turbines are believed to be advantageous from an investment and installation perspective, since costs for installation and inner cabling are dependent mainly on the number of wind turbines and not their size. Analogously, scaling up the turbines may also be argued to be advantageous from an operation and maintenance (O&M) perspective. For a given total power production of the wind farm, larger wind turbines give a smaller number of individual machines that needs to be maintained and could therefore give smaller O&M costs. However, the O&M costs are directly dependent on how failure rates, spare part costs, and time needed by technicians to perform each maintenance task and will develop for larger wind turbines. A simulation study is carried out with a discrete-event simulation model for the operational phase of an offshore wind farm, comparing the O&M costs of a wind farm consisting of 5 MW turbines with a wind farm consisting of 10 MW turbines. Simulation results confirm that O&M costs decrease when replacing two 5 MW turbines by one 10 MW turbine, if the total production capacity and all other parameters are kept equal. However, whether larger wind turbines can contribute to a reduction of cost of energy from an O&M perspective is first and foremost dependent on how the failure rates and maintenance durations for such wind turbines will develop compared to 5 MW wind turbines. Based on the results of this analysis, it is concluded that higher failure rates and maintenance durations rapidly are counterbalancing the benefits of larger wind turbines.

Matthias Hofmann; Iver Bakken Sperstad

2014-01-01T23:59:59.000Z

17

THE EFFECT OF INCREASING TRANSPORTATION COST ON FOREIGN DIRECT INVESTMENT.  

E-Print Network [OSTI]

THE EFFECT OF INCREASING TRANSPORTATION COST ON FOREIGN DIRECT INVESTMENT Major: Maritime Administration April 2009 Submitted to the Office of Undergraduate Research Texas A&M University in partial fulfillment... of the requirements for the designation as UNDERGRADUATE RESEARCH SCHOLAR A Senior Scholars Thesis by KIMBERLY GRESSLER THE EFFECT OF INCREASING TRANSPORTATION COST ON FOREIGN DIRECT INVESTMENT Approved by: Research Advisor: Joan Mileski...

Gressler, Kimberly

2009-06-09T23:59:59.000Z

18

Data Collection for Current U.S. Wind Energy Projects: Component Costs, Financing, Operations, and Maintenance; January 2011 - September 2011  

SciTech Connect (OSTI)

DNV Renewables (USA) Inc. (DNV) used an Operations and Maintenance (O&M) Cost Model to evaluate ten distinct cost scenarios encountered under variations in wind turbine component failure rates. The analysis considers: (1) a Reference Scenario using the default part failure rates within the O&M Cost Model, (2) High Failure Rate Scenarios that increase the failure rates of three major components (blades, gearboxes, and generators) individually, (3) 100% Replacement Scenarios that model full replacement of these components over a 20 year operating life, and (4) Serial Failure Scenarios that model full replacement of blades, gearboxes, and generators in years 4 to 6 of the wind project. DNV selected these scenarios to represent a broad range of possible operational experiences. Also in this report, DNV summarizes the predominant financing arrangements used to develop wind energy projects over the past several years and provides summary data on various financial metrics describing those arrangements.

Martin-Tretton, M.; Reha, M.; Drunsic, M.; Keim, M.

2012-01-01T23:59:59.000Z

19

Retro-Commissioning Increases Data Center Efficiency at Low Cost  

Broader source: Energy.gov [DOE]

Fact sheet discusses a success story detailing a retro-commissioning project at the Department of Energy's Savannah River Site to increase data center energy efficiency at low costs.

20

Cost of Increased Energy Efficiency for Residential Water Heaters  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cost of Increased Energy Efficiency for Residential Water Heaters Cost of Increased Energy Efficiency for Residential Water Heaters Speaker(s): Alex Lekov Date: March 22, 2001 - 12:00pm Location: Bldg. 90 Seminar Host/Point of Contact: Julie Osborn This presentation describes the analysis of the costs of increased energy efficiency for residential water heaters. Here, we focus on the cost and efficiency data for electric and gas-fired water heaters. This data formed the basis of the Technical Support Document for the Department of Energy's (DOE) Final Rule on Water Heaters. The engineering analysis uses computer simulation models to investigate the efficiency improvements due to design options and combinations thereof. The analysis covers four polyurethane foam insulation types based on non-ozone-depleting substances as blowing

Note: This page contains sample records for the topic "increased maintenance costs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Waste Shipment Tracking Technology Lowers Costs, Increases Efficiency |  

Broader source: Energy.gov (indexed) [DOE]

Shipment Tracking Technology Lowers Costs, Increases Shipment Tracking Technology Lowers Costs, Increases Efficiency Waste Shipment Tracking Technology Lowers Costs, Increases Efficiency February 27, 2013 - 12:00pm Addthis This graphic shows how the radiofrequency identification technology tracks and monitors packages in transport, in-transit stops and storage. This graphic shows how the radiofrequency identification technology tracks and monitors packages in transport, in-transit stops and storage. The technology developed by EM’s Office of Packaging and Transportation Packaging Certification Program technology development team was selected by the RFID Journal as the "Most Innovated Use of RFIDs.” Team members pictured here include Dr. John Lee, Dr. Yung Liu, Dr. Jim Shuler, Dr. Hanchung Tsai and John Anderson. Team members not pictured are Brian Craig and Dr. Kun Chen.

22

Operations, Maintenance, and Replacement 10-year plan, 1990-1999 : 1989 Utility OM&R Comparison : A Comparison of BPA (Bonneville Power Administration) and Selected Utility Transmission, Operations and Maintenance Costs.  

SciTech Connect (OSTI)

For the past several years, competing resource demands within BPA have forced the Agency to stretch Operations, Maintenance and Replacement (OM R) resources. There is a large accumulation of tasks that were not accomplished when scheduled. Maintenance and replacements and outages, due to material and equipment failure, appear to be increasing. BPA has made a strategic choice to increase its emphasis on OM R programs by implementing a multi-year, levelized OM R plan which is keyed to high system reliability. This strategy will require a long-term commitment of a moderate increase in staff and dollars allocated to these programs. In an attempt to assess the direction BPA has taken in its OM R programs, a utility comparison team was assembled in early January 1989. The team included representatives from BPA's Management Analysis, Internal Audit and Financial Management organizations, and operation and maintenance program areas. BPA selected four utilities from a field of more than 250 electric utilities in the US and Canada. The selection criteria generally pertained to size, with key factors including transformation capacity, load, gross revenue, and interstate transmission and/or marketing agreements, and their OM R programs. Information was gathered during meetings with managers and technical experts representing the four utilities. Subsequent exchanges of information also took place to verify findings. The comparison focused on: Transmission operations and maintenance program direction and emphasis; Organization, management and implementation techniques; Reliability; and Program costs. 2 figs., 21 tabs.

United States. Bonneville Power Administration.

1990-09-01T23:59:59.000Z

23

Project Project Funding Operational & Maintenance Costs Univ. Project Title GSF Brief Description of Project Location Amount Source  

E-Print Network [OSTI]

Project Project Funding Operational & Maintenance Costs Univ. Project Title GSF Brief Description of Project Location Amount Source UF Minor Projects for UF 50,000 Minor projects for facilities located and education. Typical projects consist of Gainesville/ Typical projects other funding greenhouses, general

Slatton, Clint

24

Costing for National Electricity Interventions to Increase Access to Energy, Health Services, and Education  

E-Print Network [OSTI]

Costing for National Electricity Interventions to Increase Access to Energy, Health Services ..................................................................................................... 6 2 Earth Institute Electricity Planning and Investment Costing Model........................................................................... 21 4.1 Total costs of electricity distribution scale-up............................

Modi, Vijay

25

Steam turbine maintenance and repair technology: Reducing planned-outage costs  

SciTech Connect (OSTI)

The North American Electric Reliability Council (NAERC) reported that the average loss of equivalent availability per outage for a major fossil turbine overhaul is 323,000 MW-HR. The Electric Power Research Institute (EPRI) Generation and Storage Division, is in the first phase of a major research project to reduce the duration and/or frequency of steam turbine maintenance outages. This project consists of an assessment of the current state-of-the-art turbine maintenance and repair techniques and technologies. It is based on a review of current turbine maintenance practices of the US, European, Japanese, and Australian utility industries. Emphasized are maintenance and repair activities that have the most significant impact on outage duration or frequency. Twenty-six key turbine maintenance activities and the current best techniques were identified for use by utility maintenance personnel. Overall outage durations could be reduced if the duration of these activities were shortened or if they were performed more effectively. Recommended projects for development of advanced steam turbine maintenance technology were identified. 29 refs., 46 figs., 9 tabs.

Grace, H.P.; McClintock, M. (General Physics Corp., Columbia, MD (USA)); Lamping, G. (Southwest Research Inst., San Antonio, TX (USA))

1990-04-01T23:59:59.000Z

26

California: Energy-Efficient Glass Saves Energy Costs, Increases...  

Office of Environmental Management (EM)

View Inc. was able to demonstrate this technology on a much larger scale, laying a foundation for use in future building design. View's window designs are decreasing energy costs...

27

MFR PAPER 1178 An Analysis of Increasing Costs  

E-Print Network [OSTI]

in a struggle for economic survival. The energy crisis had the most devastating impact on an industry beset owners and/or managers operating from ports in Florida, Mississippi, and Texas. Additional financial financing . Cost and re- turn estimates for 1971 used in this re- port are based on a sample of 29 vessels

28

Retro-Commissioning Increases Data Center Efficiency at Low Cost  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Achieved at SRS Basic Retro-Cx: 1. Eliminated electric reheat. 2. Turned off humidification devices. 3. Tuned floor tile airflow. 4. Turned off three CRAC units. Total estimated savings ≅ 1,400,000 kWh/year Retro-Cx cost at SRS: Engineering consultant: preliminary, on-site, and follow-up work including data measurements and retrieval. SRS on-site facilities personnel and engineering support. Total estimated cost ≅ $25,000 Simple Payback at SRS: Estimated, at $0.045/kWh = 2.5 months. taken in the SRS program addressed retro-commissioning. Retro-Commissioning In general, retro-commissioning (Retro- Cx) is a systematic, documented process

29

Retro-Commissioning Increases Data Center Efficiency at Low Cost  

Broader source: Energy.gov (indexed) [DOE]

Achieved at SRS Basic Retro-Cx: 1. Eliminated electric reheat. 2. Turned off humidification devices. 3. Tuned floor tile airflow. 4. Turned off three CRAC units. Total estimated savings ≅ 1,400,000 kWh/year Retro-Cx cost at SRS: Engineering consultant: preliminary, on-site, and follow-up work including data measurements and retrieval. SRS on-site facilities personnel and engineering support. Total estimated cost ≅ $25,000 Simple Payback at SRS: Estimated, at $0.045/kWh = 2.5 months. taken in the SRS program addressed retro-commissioning. Retro-Commissioning In general, retro-commissioning (Retro- Cx) is a systematic, documented process

30

Minimization of Transportation, Installation and Maintenance Operations Costs for Offshore Wind Turbines.  

E-Print Network [OSTI]

??Although it is a sustainable source and there is abundant potential for energy, cost of energy generated from offshore wind is still high compared to (more)

Faiz, Tasnim Ibn

2014-01-01T23:59:59.000Z

31

Ocean acidification may increase calcification rates, but at a cost  

Science Journals Connector (OSTI)

...are compromised in acidified seawater. By contrast, here we show...to compensate for increased seawater acidity). However, this...Hall-Spencer2007Effects of anthropogenic seawater acidification on acid-base...arm regeneration on energy storage and gonad production in Ophiocoma...

2008-01-01T23:59:59.000Z

32

Operations and maintenance philosophy  

SciTech Connect (OSTI)

This Operations and Maintenance (O&M) Philosophy document is intended to establish a future O&M vision, with an increased focus on minimizing worker exposure, ensuring uninterrupted retrieval operations, and minimizing operation life-cycle cost. It is intended that this document would incorporate O&M lessons learned into on-going and future project upgrades.

DUNCAN, G.P.

1999-10-28T23:59:59.000Z

33

Increasing the Work-Safety in Nuclear Power Plants through the Use of Preventive Maintenance Policies  

Science Journals Connector (OSTI)

Nuclear power is being used at an increasing rate as a substitute for scarce and expensive classical energy sources. Controlled nuclear fission generates energy but, at the same time, produces radioactive subs...

Dr. U. Pachow; Prof. Dr. H. Gehring; H. J. Rokohl

1982-01-01T23:59:59.000Z

34

Operations and Maintenance  

Broader source: Energy.gov [DOE]

Lower operations and maintenance (O&M) costs are critical to reducing a solar system's lifecycle cost of ownership. O&M costs are influenced by up-front investments in design, engineering,...

35

Substations reliability-centered maintenance and predictive maintenance - a strategic partnership  

SciTech Connect (OSTI)

A maintenance optimization study for substation components can be most effective when Reliability Centered Maintenance (RCM) Analysis is combined with a Predictive Maintenance (PDM) Assessment. If the two processes are performed concurrently, the benefit-to-cost ratios for each is increased. Also, the cost of implementing RCM recommendations for condition monitoring can be minimized, while maximizing their impact at the same time. This paper presents the essential elements of both the RCM and PDM processes, and describes how they work together in a substation environment as a comprehensive maintenance assessment tool. Descriptions of recent experiences are also included.

Colsher, R.J. [Electric Power Research Institute, Eddystone, PA (United States); Abbott, P.D.; Matusheski, R.L. [EPRI & MD Center, Eddystone, PA (United States); Smith, S.B. [ERIN Engineering & Research, Walnut Creek, CA (United States)

1996-08-01T23:59:59.000Z

36

Building Energy Software Tools Directory: Maintenance Edge  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Maintenance Edge Maintenance Edge Maintenance Edge logo Maintenance Edge is a suite of online Software as a Service (SaaS) facility management tools that gives control and management over buildings without a capital investment. Maintenance Edge enables you to combine work order, planned maintenance, work order wireless, and critical alarms with the option of adding inventory. Fully implemented, Maintenance Edge will cut labor time, increase energy efficiencies, save on capital expenditures, and save on budget and management time. Features include: easy/user-friendly work order requesting, unlimited users, seven different user roles (limits data users can see), no capital or hardware costs required, access to data anywhere anytime, easy-to-click reporting on all the data in your system,

37

Reduce Operating Costs with an EnergySmart School Project  

Office of Energy Efficiency and Renewable Energy (EERE)

EnergySmart Schools fact sheet on how school operations and maintenance (O&M) personnel can play a greater role in managing ever-increasing energy costs.

38

Veeco Develops a Tool to Reduce Epitaxy Costs and Increase LED Brightness  

Broader source: Energy.gov [DOE]

With the help of DOE funding, Veeco is working on reducing epitaxy costs and increasing LED efficiency by developing a physical vapor deposition (PVD) tool for depositing aluminum nitride buffer layers on LED substrates. PVD, also known as "sputtering," is an alternative to metal-organic chemical vapor deposition (MOCVD). PVD is a purely physical process that involves plasma sputter bombardment rather than a chemical reaction at the surface to be coated, as in MOCVD.

39

Reducing Heavy-Haul Railcar Maintenance Costs and Improving Terminal Performance Using Technology: A Lean Production Approach  

E-Print Network [OSTI]

operations. This research applies Lean Manufacturing methods to the railcar maintenance process industries to improve production and manufacturing efficiency. In the 2000s, various production management with terminal dwell [3,4]. In addition, Logan suggested that for every 15% reduction in systemwide average

Illinois at Urbana-Champaign, University of

40

Ankle fixation need not increase the energetic cost of human walking Matthew T. Vanderpool a,b  

E-Print Network [OSTI]

Ankle fixation need not increase the energetic cost of human walking Matthew T. Vanderpool a tested whether the metabolic energy cost of walking with the ankles immobilized can be comparable. Fixation of the ankle might be expected to eliminate the work it normally performs, to detrimental effect

Collins, Steven H.

Note: This page contains sample records for the topic "increased maintenance costs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Impacts of increased outdoor air flow rates on annual HVAC energy costs in office environment.  

E-Print Network [OSTI]

??The use of different ventilation systems has an important impact on the energy cost of office buildings. This paper examines the relationship between heating and (more)

Destrez, Adrien

2011-01-01T23:59:59.000Z

42

Feedback Can Increase the CapacityCost Function of Discrete Channels with Memory y  

E-Print Network [OSTI]

bound to the capacity­cost func­ tion with feedback (CFB (fi)). The lower bound to CFB (fi) is then shown numerically to exceed the upper bound to CNFB (fi). An upper bound to CFB (fi) is also obtained and feedback capacity­cost functions -- denoted by CNFB (fi) and CFB (fi) respectively -- in order to deter

Alajaji, Fady

43

Reducing Enzyme Costs Increases the Market Potential of Biofuels (Fact Sheet)  

SciTech Connect (OSTI)

Cellulosic ethanol prices depend heavily on the cost of the cellulase enzymes used to break down the biomass into fermentable sugars. To reduce these costs, NREL partnered with two leading enzyme companies, Novozymes and Genencor, to engineer new cellulase enzymes that are exceptionally good at breaking down cellulose. Genencor is now part of DuPont Industrial Biosciences.

Not Available

2013-08-01T23:59:59.000Z

44

Preventive Maintenance Strategies for Compressed Air Systems  

Broader source: Energy.gov [DOE]

This tip sheet discusses preventive maintenance strategies for compressed air systems to avoid high equipment repair and replacement costs.

45

Maintenance Types  

Broader source: Energy.gov [DOE]

Proper operations and maintenance (O&M) goes beyond repairing equipment after it breaks. Several maintenance strategies exist to prevent systems disrepair and degradation. A combination of the...

46

Evaluating the costs and benefits of increased funding for public transportation in Chicago  

E-Print Network [OSTI]

(cont.) off-peak ridership, is at or slightly below break-even with respect to net benefits if the CTA cost structure and tax source of subsidy remains unchanged. In order to justify any significant additional long-term ...

Schofield, Mark L., 1973-

2004-01-01T23:59:59.000Z

47

The Cost Effectiveness of Fracture Stimulation in Increasing the Flow from Geothermal Wells  

SciTech Connect (OSTI)

The cost effectiveness of fracture stimulation at The Geysers, the Imperial Valley, and other geothermal resource areas in the United States vas studied using GEOCOM, a computer code for analyzing the impact of completion activities on the life-cycle costs of geothermal wells. Technologies for fracturing the reservoir near the wellbore involve the creation of a pressure pulse in the wellbore by means of either hydraulic or explosive force. The cost of a single fracture stimulation job can vary from $50,000 to over $500,000, with a typical cost of around $300,000. The code shows that additional flow achieved by fracture stimulation must exceed 10,000 pounds per hour for each $100,000 invested in stimulation in order for a fracture treatment to be cost effective. In some reservoirs, this additional flow must be as great as 30,000 pounds per hour. The cost effectiveness of fracturing has not yet been demonstrated in the field. The Geothermal Well Stimulation Program achieved an overall average of about 10,000 pounds per hour for each $100,000 invested.

Brown, Gerald L.

1983-12-15T23:59:59.000Z

48

High Performance Without Increased Cost: Urbane Homes, Louisville, KY- Building America Top Innovation  

Broader source: Energy.gov [DOE]

This Building America Innovations profile describes work with Urbane Homes of Louisville, Kentucky, to build a high-performance home that cost $36 per ft2 (not counting the lot).Between 2005 and 2010, Building America research partners worked with 34 builders to construct nearly 3,000 HERS

49

Assessment of light water reactor power plant cost and ultra-acceleration depreciation financing  

E-Print Network [OSTI]

Although in many regions of the U.S. the least expensive electricity is generated from light-water reactor (LWR) plants, the fixed (capital plus operation and maintenance) cost has increased to the level where the cost ...

El-Magboub, Sadek Abdulhafid.

50

Tradeoffs associated with increasing water yield from the Edwards Plateau, Texas: balancing private costs and public benefits  

E-Print Network [OSTI]

the scientific basis for estimating how water yields are likely to increase in response to incremental levels of brush removal for sites in the Edwards Plateau. An objective of this thesis was to estimate ranchers' willingness to participate in a cost...

Garriga, Matthew David

2012-06-07T23:59:59.000Z

51

The cardiac output response and the oxygen cost of increased work of breathing  

E-Print Network [OSTI]

. By back extrapolation from the measured values, Liljestrand estimated the oxygen cost of breathing at rest to be about 0. 5 ml Op per liter of ventilation. This resting value was later substantiated by Neilsen ( 1936). In addition, Nei lsen also...-smokers and free from any 20 WORlC 8. 1750 cal VOLUME 1142 el s M*X IHSP PRE -8. 48 cwH20 MAX EXP PRE 2 ' 22 cMH2Q Figure 4. Work of breathing measurement of a single breath at rest. The shaded and black areas to the left of the base pressure (-4. 5 cm...

Krause, Kevin Michael

1989-01-01T23:59:59.000Z

52

Reactive Maintenance  

Broader source: Energy.gov [DOE]

Reactive maintenance follows a run-it-until-it-breaks strategy where no actions or efforts are taken to maintain equipment as intended by the manufacturer. Studies indicate this is still the predominant mode of maintenance for Federal facilities.

53

Fume Hood Sash Stickers Increases Laboratory Safety and Efficiency at Minimal Cost  

Broader source: Energy.gov [DOE]

Case study describes two University of California campuses that increased laboratory exhaust efficiency and safety by using fume hood sash stickers.

54

INCREASE  

ScienceCinema (OSTI)

The Interdisciplinary Consortium for Research and Educational Access in Science and Engineering (INCREASE), assists minority-serving institutions in gaining access to world-class research facilities.

None

2013-07-22T23:59:59.000Z

55

Metal and Glass Manufacturers Reduce Costs by Increasing Energy Efficiency in Process Heating Systems  

Broader source: Energy.gov [DOE]

Process heating plays a key role in producing steel, aluminum, and glass and in manufacturing products made from these materials. Faced with regulatory and competitive pressures to control emissions and reduce operating costs, metal and glass manufacturers are considering a variety of options for reducing overall energy consumption. As 38% of the energy used in U.S. industrial plants is consumed for process heating applications, metal and glass manufacturers are discovering that process heating technologies provide significant opportunities for improving industrial productivity, energy efficiency, and global competitiveness. This fact sheet is the first in a series to describe such opportunities that can be realized in industrial systems by conducting plant-wide assessments (PWA).

56

Game theory analysis of aircraft manufacturer innovation strategies in the face of increasing airline fuel costs  

E-Print Network [OSTI]

The air transportation system is a vital infrastructure that enables economic growth and provides significant social benefits. Future increases and volatility in crude oil prices, as well as environmental charges, are ...

Morrison, James K. D. (James Kelley Douglas)

2011-01-01T23:59:59.000Z

57

Cost-Effective Consolidation of Fine Aluminum Scrap for Increased Remelting Effieciency  

SciTech Connect (OSTI)

The main objective of this research was to develop a new re-melting process for fine or light gauge aluminum scrap products that exhibits dramatic improvements in energy efficiency. Light gauge aluminum scrap in the form of chips, turnings, and borings has historically been underutilized in the aluminum recycling process due to its high surface area to volume ratio resulting in low melt recovery. Laboratory scale consolidation experiments were performed using loose aluminum powder as a modeling material as well as shredded aluminum wire scrap. The processing parameters necessary to create consolidated aluminum material were determined. Additionally, re-melting experiments using consolidated and unconsolidated aluminum powder confirmed the hypothesis that metal recovery using consolidated material will significantly improve by as much as 20%. Based on this research, it is estimated that approximately 495 billion Btu/year can be saved by implementation of this technology in one domestic aluminum rolling plant alone. The energy savings are realized by substituting aluminum scrap for primary aluminum, which requires large amounts of energy to produce. While there will be an initial capital investment, companies will benefit from the reduction of dependence on primary aluminum thus saving considerable costs. Additionally, the technology will allow companies to maintain in-house alloy scrap, rather than purchasing from other vendors and eliminate the need to discard the light gauge scrap to landfills.

William Van Geertruyden

2005-09-22T23:59:59.000Z

58

Operations & Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Contact Information Transmission Planning Western OATT Revision Maintenance Services Meter policy (pdf) Meter application agreement Behind the Meter Generation policy (doc)...

59

Remote maintenance  

SciTech Connect (OSTI)

A general description is given of the study of maintenance design in reactor designs. The Fusion Experimental Reactor and INTOR-J are discussed in terms of simplicity in remote maintenance design, and a figure shows one of the designs of a torus sector configuration for the Fusion Experimental Reactor. An R-tokamak which is under design is a D-T burning device with a Q less than unity. Technical issues are listed and it is suggested that a long-range plan for fusion remote maintenance should be implemented. A multijoint inspection system and a remote maintenance simulation test model of the divertor module are shown.

Kazawa, Y.; Tachikawa, K.; Tone, T.

1983-12-01T23:59:59.000Z

60

Preventive Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Preventive Maintenance Preventive Maintenance Preventive Maintenance October 7, 2013 - 9:44am Addthis Preventive maintenance aims to sustain or extend system lifespan through a set of actions that detect, preclude, or mitigate system degradation. These actions are based on either calendar time or machine run time. Advantages Federal agencies can greatly extend equipment reliability and lifespan by expending the necessary resources for regular maintenance. In most cases, the system designer or manufacturer outlines regular maintenance under a preventive strategy. In addition to increased reliability and lifespan, budget is saved over the life of the system. Preventive maintenance programs can save as much as 12% to 18% in equipment repair and replacement. Other advantages of preventitive maintenance are:

Note: This page contains sample records for the topic "increased maintenance costs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Preventive Maintenance  

Broader source: Energy.gov [DOE]

Preventive maintenance aims to sustain and/or extend system lifespan through a set of actions that detect, preclude, or mitigate system degradation. These actions are based on either calendar time or machine run time.

62

Predictive Maintenance  

Broader source: Energy.gov [DOE]

Predictive maintenance aims to detect equipment degradation and address problems as they arise. The result indicates potential issues, which are controlled or eliminated prior to any significant system deterioration.

63

Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Task 4 Report: Virtual Mockup Maintenance Task Evaluation  

SciTech Connect (OSTI)

Task 4 report of 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. This report focuses on using Full-scale virtual mockups for nuclear power plant training applications.

Timothy Shaw; Anthony Baratta; Vaughn Whisker

2005-02-28T23:59:59.000Z

64

Advances in solar photovoltaics are urgently needed to increase the performance and reduce the cost of harvesting solar power. Solution-processed photovoltaics are cost-effective to manufacture and offer the potential for physical flexibility.  

E-Print Network [OSTI]

, Toronto, M5S 3G4, Canada. O ne hundred and twenty thousand terawatts of solar power irradiate EarthAdvances in solar photovoltaics are urgently needed to increase the performance and reduce the cost of harvesting solar power. Solution-processed photovoltaics are cost-effective to manufacture and offer

65

Reliability-Centered Maintenance  

Broader source: Energy.gov [DOE]

Reliability-centered maintenance leverages the same practices and technologies of predictive maintenance.

66

Fact #708: January 2, 2012 Amenities, Safety and Emissions Equipment Make Up an Increasing Share of the Cost of a Car  

Broader source: Energy.gov [DOE]

While the overall price of a new car has not increased greatly from 1967 to 2010 when adjusted for inflation, the costs associated with added amenities like navigation, telematics, power seats and...

67

Cost Containment  

Science Journals Connector (OSTI)

Cost containment in health care involves awide ... , the growth rate of expenditure or certain costs of health care services. These measures include ... patient education, etc. The reasons for increased cost ...

2008-01-01T23:59:59.000Z

68

Improved Battery Pack Thermal Management to Reduce Cost and Increase Energy Density: Cooperative Research and Development Final Report, CRADA Number CRD-12-499  

SciTech Connect (OSTI)

Under this CRADA NREL will support Creare's project for the Department of Energy entitled 'Improved Battery Pack Thermal Management to Reduce Cost and Increase Energy Density' which involves the development of an air-flow based cooling product that increases energy density, safety, and reliability of hybrid electric vehicle battery packs.

Smith, K.

2013-10-01T23:59:59.000Z

69

Federal Energy Management Program: Maintenance Types  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Maintenance Types Maintenance Types Proper operations and maintenance (O&M) goes beyond repairing equipment after it breaks. Several maintenance strategies exist to prevent systems disrepair and degradation. A combination of the following can ensure an optimal blend of cost and life-cycle effectiveness: Reactive Maintenance: Follows a "run it until it breaks" strategy. No action or effort is taken to maintain equipment, prevent failure, or ensure life of the system - even if actions are suggested by the manufacturer. Preventive Maintenance: Refers to a series of actions performed on calendar time or machine run time schedules. Predictive Maintenance: Strives to detect the onset of equipment degradation and address the problems as they are identified. Several predictive maintenance technologies exist.

70

Risk-based decision making method for maintenance policy selection of thermal power plant equipment  

Science Journals Connector (OSTI)

This study presents a decision-making method for maintenance policy selection of power plants equipment. The method is based on risk analysis concepts. The method first step consists in identifying critical equipment both for power plant operational performance and availability based on risk concepts. The second step involves the proposal of a potential maintenance policy that could be applied to critical equipment in order to increase its availability. The costs associated with each potential maintenance policy must be estimated, including the maintenance costs and the cost of failure that measures the critical equipment failure consequences for the power plant operation. Once the failure probabilities and the costs of failures are estimated, a decision-making procedure is applied to select the best maintenance policy. The decision criterion is to minimize the equipment cost of failure, considering the costs and likelihood of occurrence of failure scenarios. The method is applied to the analysis of a lubrication oil system used in gas turbines journal bearings. The turbine has more than 150MW nominal output, installed in an open cycle thermoelectric power plant. A design modification with the installation of a redundant oil pump is proposed for lubricating oil system availability improvement.

F.G. Carazas; G.F.M. Souza

2010-01-01T23:59:59.000Z

71

An approach to measuring the quality of maintenance performance  

Science Journals Connector (OSTI)

......Transportation cost. NbM = Cost of salaries. Ny = Price of selling...finished product. ai = Initial cost of production associated to department i. di...maintenance performance in oil and gas production assets: theoretical architecture......

S. A. Oke; M. K. O. Ayomoh; I. O. Oyedokun

2007-01-01T23:59:59.000Z

72

Building America Top Innovations Hall of Fame Profile … High Performance Without Increased Cost: Urbane Homes, Louiseville KY  

Broader source: Energy.gov (indexed) [DOE]

Urbane's first Urbane's first home, built for $36 per ft 2 in 2008, incorporated both energy efficiency and strategies to reduce building costs. The home won two EnergyValue Housing Awards, and homebuyers began seeking out the builder for energy-efficient, high-quality homes. Building America field projects that demonstrated minimal or cost-neutral impacts for high-performance homes have significantly influenced the housing industry to apply advanced technologies and best practices. In 2006, the U.S. Department of Energy's Building America program set a goal of proving that cost-neutral energy savings of 40% over code were possible at a production scale for new home builders in every U.S. climate zone. Between 2005 and 2010, Building America research partners worked with 34 builders to

73

High power vented nickel-cadmium cells designed for ultra low maintenance  

SciTech Connect (OSTI)

Initially the SAFT program to develop maintenance-free battery technology was in response to a U.S. Air Force commitment to eliminate the need for battery maintenance shops at the line level. The U.S. Navy, through its Crane, Indiana Battery Test Facility, added further demands. They wanted new nickel cadmium battery designs that were lighter, had greater power, more capacity, required much less maintenance, and still met standard Military Specification size requirements. Crane personnel recognized that the major savings in the maintenance costs were achievable in 3- to 5-fold increases of the maintenance period and that non-maintainability was not necessarily a design requisite. In response, SAFT established an internally funded program whose objective was the development of a battery technology that would provide military aircraft batteries meeting these demands.

Scardaville, P.A. (SAFT America, Inc., Valdosta, GA (United States)); Newman, B.C. (Naval Surface Warfare Center, Crane, IN (United States))

1993-05-01T23:59:59.000Z

74

High Fuel Costs Spark Increased Use of Wood for Home Heating by Brian Handwerk for National Geographic News  

E-Print Network [OSTI]

families reducing their costly household oil or gas dependence by turning to a traditional fuel is typically delivered to homes in tanks, and is almost as expensive as heating oil. Berry manages the EIA Hampshire. Just last week, Erik said, he had a discussion with his fuel-oil supplier about how little oil

South Bohemia, University of

75

Ensuring Physicians' Competence Is Maintenance of Certification the Answer?  

Science Journals Connector (OSTI)

Pressed by their leaders, external stakeholders, and a public troubled by lapses in the quality of care and unsustainable cost increases, physicians are facing stiffer challenges in initiatives designed to link more closely the goals of learning with the delivery of better care and measures of greater... Maintenance of certification programs sponsored by the American Board of Medical Specialties and its member boards were designed to improve and assess physicians' clinical competence. The authors discuss the history of MOC and current controversies.

Iglehart J.K.; Baron R.B.

2012-12-27T23:59:59.000Z

76

Investigation of the Integration of Interstitial Building Spaces on Costs and Time of Facility Maintenance for U.S. Army Hospitals  

E-Print Network [OSTI]

The U.S. Army Medical Department (AMEDD) has used the interstitial building system (IBS) as a design component for some of the hospitals in its healthcare infrastructure portfolio. Department of Defense (DoD) leadership is aware of increases...

Leveridge, Autumn Tamara

2013-04-30T23:59:59.000Z

77

Drive alignment pays maintenance dividends  

SciTech Connect (OSTI)

Proper alignment of the motor and gear drive on conveying and processing equipment will result in longer bearing and coupling life, along with lower maintenance costs. Selecting an alignment free drive package instead of a traditional foot mounted drive and motor is a major advancement toward these goals. 4 photos.

Fedder, R. [Rexnord Industries, Milwaukee, WI (United States)

2008-12-15T23:59:59.000Z

78

Composites for Aerospace and Transportation As the fuel costs and environment concerns continue to increase, so does the demand for composite  

E-Print Network [OSTI]

Composites for Aerospace and Transportation As the fuel costs and environment concerns continue to increase, so does the demand for composite materials for aerospace and transportation applications. Polymer composites are inherited lighter than their metallic counterparts resulting in significant weight reduction

Li, Mo

79

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: Energy.gov (indexed) [DOE]

O&M Best Practices Guide, Release 3.0 6.1 O&M Best Practices Guide, Release 3.0 6.1 Chapter 6 Predictive Maintenance Technologies 6.1 Introduction Predictive maintenance attempts to detect the onset of a degradation mechanism with the goal of correcting that degradation prior to significant deterioration in the component or equipment. The diagnostic capabilities of predictive maintenance technologies have increased in recent years with advances made in sensor technologies. These advances, breakthroughs in component sensitivities, size reductions, and most importantly, cost, have opened up an entirely new area of diagnostics to the O&M practitioner. As with the introduction of any new technology, proper application and TRAINING is of

80

New England Wind Forum: Cost Trends  

Wind Powering America (EERE)

Cost Trends Cost Trends Figure 1: Cost of Energy and Cumulative Domestic Capacity This graph shows how the cumulative domestic wind capacity (MW) has increased since 1980, while the cost of energy from wind power has declined by a factor of approximately 20 times during the same period but has increased slightly since 2001. Click on the image to view a larger version. This graph shows how the cumulative domestic wind capacity (MW) has increased since 1980, while the cost of energy from wind power has declined by a factor of approximately 20 times during the same period but has increased slightly since 2001. View a larger version of the graph. Overall, the wind industry is experiencing long-term decreases in the cost to produce wind-generated electricity (Figure 1), despite recent short-term increases in upfront equipment costs. Even in the short term, however, the effect of increases in up-front capital costs on the cost of energy from wind power projects has been dampened by improvements in energy capture from the wind and decreases in operating and maintenance costs.

Note: This page contains sample records for the topic "increased maintenance costs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

13 - Maintenance and repair of gas turbine components  

Science Journals Connector (OSTI)

Abstract: Material selection is a key factor in gas turbine performance and lifecycle cost because it has a central influence in the maintenance of the gas turbine.1 Further, the operation of a gas turbine does result in gas path degradation2 that impacts lifecycle costs and eventually design, manufacture, material choice and maintenance.3 A component repair programme that minimizes maintenance costs and maximizes equipment availability can be instituted to meet or improve lifecycle cost. This chapter presents the key factors influencing the need for maintenance and the choices available.

T. lvarez Tejedor; R. Singh; P. Pilidis

2013-01-01T23:59:59.000Z

82

Microsoft Word - maintenance  

Broader source: Energy.gov (indexed) [DOE]

System Maintenance Checklist System Maintenance Checklist The following checklist is intended to provide system owners, project managers and other information system developers and maintainers with guidance in identifying and planning system maintenance activities. The objectives of system maintenance are summarized as: C Resolution of errors, faults, and failures. C The requirements for system maintenance initiates lifecycle changes. The change is remapped and executed, thereby treating the maintenance process as iterations of development. Rev: 09/02 1 Maintenance Checklist SEM Reference Comments " A procedure exists for handling emergency changes that cannot be implemented as part of a scheduled release. Chapter 10 Maintenance " An identification number is assigned to the modification.

83

Semi-exact concentric atomic density fitting: Reduced cost and increased accuracy compared to standard density fitting  

SciTech Connect (OSTI)

A local density fitting scheme is considered in which atomic orbital (AO) products are approximated using only auxiliary AOs located on one of the nuclei in that product. The possibility of variational collapse to an unphysical attractive electron state that can affect such density fitting [P. Merlot, T. Kjrgaard, T. Helgaker, R. Lindh, F. Aquilante, S. Reine, and T. B. Pedersen, J. Comput. Chem. 34, 1486 (2013)] is alleviated by including atom-wise semidiagonal integrals exactly. Our approach leads to a significant decrease in the computational cost of density fitting for HartreeFock theory while still producing results with errors 25 times smaller than standard, nonlocal density fitting. Our method allows for large HartreeFock and density functional theory computations with exact exchange to be carried out efficiently on large molecules, which we demonstrate by benchmarking our method on 200 of the most widely used prescription drug molecules. Our new fitting scheme leads to smooth and artifact-free potential energy surfaces and the possibility of relatively simple analytic gradients.

Hollman, David S. [Center for Computational Quantum Chemistry, University of Georgia, 1004 Cedar St., Athens, Georgia 30602 (United States) [Center for Computational Quantum Chemistry, University of Georgia, 1004 Cedar St., Athens, Georgia 30602 (United States); Department of Chemistry, Virginia Tech, Blacksburg, Virginia 24061 (United States); Schaefer, Henry F. [Center for Computational Quantum Chemistry, University of Georgia, 1004 Cedar St., Athens, Georgia 30602 (United States)] [Center for Computational Quantum Chemistry, University of Georgia, 1004 Cedar St., Athens, Georgia 30602 (United States); Valeev, Edward F. [Department of Chemistry, Virginia Tech, Blacksburg, Virginia 24061 (United States)] [Department of Chemistry, Virginia Tech, Blacksburg, Virginia 24061 (United States)

2014-02-14T23:59:59.000Z

84

Analysis of Cycling Costs in Western Wind and Solar Integration Study  

SciTech Connect (OSTI)

The Western Wind and Solar Integration Study (WWSIS) examined the impact of up to 30% penetration of variable renewable generation on the Western Electricity Coordinating Council system. Although start-up costs and higher operating costs because of part-load operation of thermal generators were included in the analysis, further investigation of additional costs associated with thermal unit cycling was deemed worthwhile. These additional cycling costs can be attributed to increases in capital as well as operations and maintenance costs because of wear and tear associated with increased unit cycling. This analysis examines the additional cycling costs of the thermal fleet by leveraging the results of WWSIS Phase 1 study.

Jordan, G.; Venkataraman, S.

2012-06-01T23:59:59.000Z

85

USING CABLE SUSPENDED SUBMERSIBLE PUMPS TO REDUCE PRODUCTION COSTS TO INCREASE ULTIMATE RECOVERY IN THE RED MOUNTAIN FIELD OF THE SAN JUAN BASIN REGION  

SciTech Connect (OSTI)

This report discusses: (1) being able to resume marginal oil production operations in the Red Mountain Oil Field, located in McKinley County, New Mexico by installing a cable suspended electric submersible pumping system (HDESP); (2) determining if this system can reduce life costs making it a more cost effective production system for similar oil fields within the region, and if warranted, drill additional wells to improve the economics. In April 2003, a cooperative 50% cost share agreement between Enerdyne and the DOE was executed to investigate the feasibility of using cable suspended electric submersible pumps to reduce the life costs and increase the ultimate oil recovery of the Red Mountain Oil Field, located on the Chaco Slope of the San Juan Basin, New Mexico. The field was discovered in 1934 and has produced approximately 55,650 cubic meters (m{sup 3}), (350,000 barrels, 42 gallons) of oil. Prior to April 2003, the field was producing only a few cubic meters of oil each month; however, the reservoir characteristics suggest that the field retains ample oil to be economic. This field is unique, in that, the oil accumulations, above fresh water, occur at depths from 88-305 meters, (290 feet to 1000 feet), and serves as a relatively good test area for this experiment.

Don L. Hanosh

2004-11-01T23:59:59.000Z

86

Predictive Maintenance Technologies  

Broader source: Energy.gov [DOE]

Several diagnostic technologies and best practices are available to assist Federal agencies with predictive maintenance programs.

87

Improve Operations & Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Improve Operations & Maintenance Improve Operations & Maintenance Improve Operations & Maintenance Photo of an equipment room in a high-rise commercial office building with red and green equipment. Every building's energy consumption can benefit from rigorous operations and maintenance (O&M) practices. Properly planned and executed O&M is one of the most cost-effective strategies for ensuring equipment longevity, reliability, safety, and energy efficiency in commercial buildings. By one estimate, O&M measures cost about 20 times less and achieve roughly the same energy savings as energy efficiency upgrades. There are various opportunities to improve efficiency through O&M that can be discovered through efforts such as engaging tenants, training building staff, and

88

Reliability-based maintenance evaluations and standard preventive maintenance programs  

SciTech Connect (OSTI)

Due to recent issuance of 10CFR50.65, the U.S. Nuclear Regulatory Commission maintenance rule (Rule), and the [open quotes]Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants[close quotes] prepared by the Nuclear Management and Resources Council, many utilities are undertaking review or evaluation of current preventive maintenance (PM) programs. Although PM optimization and documentation are not specifically required by the Rule, an appropriate and effective PM program (PMP) will be the cornerstone of the successful and cost-effective implementation of the Rule. Currently, a project is being conducted at the Vermont Yankee Nuclear Power Station (VYNPS) in conjunction with Quadrex Energy Services to evaluate, optimize, and document the PMP. The project began in March 1993 and is scheduled for completion in mid-1995. The initial scope for the project is the evaluation of those structures, systems, and components that are within the scope of the Rule. Because of the number of systems to be evaluated ([approximately]50), the desired completion schedule, and cost considerations, a streamlined approach to PM optimization and documentation is being utilized.

Varno, M. (Vermont Yankee Nuclear Power Corp., Vernon, VT (United States)); McKinley, M. (Quadrex Energy Services Corp., Campbell, CA (United States))

1993-01-01T23:59:59.000Z

89

Maintenance Management Program for DOE Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To define the program for the management of cost-effective maintenance of Department of Energy (DOE) nuclear facilities. Guidance for compliance with this Order is contained in DOE G 433.1-1, Nuclear Facility Maintenance Management Program Guide for use with DOE O 433.1, which references Federal regulations, DOE directives, and industry best practices using a graded approach to clarify requirements and guidance for maintaining DOE-owned Government property. (Cancels DOE 4330.4B, Chapter II, Maintenance Management Program, dated 2-10-94.) Cancels DOE 4330.4B (in part). Canceled by DOE O 433.1A.

2001-06-01T23:59:59.000Z

90

Computerized Maintenance Management Systems  

Broader source: Energy.gov [DOE]

Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and maintenance (O&M) programs. The software automates most of the logistical functions performed by O&M staff.

91

Maintenance and Veg Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Infrastructure projects Interconnection OASIS OATT Reauthorization of Transmission Line Permits, Maintenance and Vegetation Management on Forest Service Lands in Colorado,...

92

CBE UFAD cost analysis tool: Life cycle cost model, issues and assumptions  

E-Print Network [OSTI]

Building Maintenance and Repair Cost Reference. WhitestoneJ. Wallis and H. Lin. 2008. CBE UFAD Cost Analysis Tool:UFAD First Cost Model, Issues and Assumptions. Center for

Webster, Tom; Benedek, Corinne; Bauman, Fred

2008-01-01T23:59:59.000Z

93

The effects of ergonomic stressors on process tool maintenance and utilization  

SciTech Connect (OSTI)

This study examines ergonomic stressors associated with front-end process tool maintenance, relates them to decreased machine utilization, and proposes solution strategies to reduce their negative impact on productivity. Member company ergonomists observed technicians performing field maintenance tasks on seven different bottleneck tools and recorded ergonomic stressors using SEMaCheck, a graphics-based, integrated checklist developed by Sandia National Laboratories. The top ten stressors were prioritized according to a cost formula that accounted for difficulty, time, and potential errors. Estimates of additional time on a task caused by ergonomic stressors demonstrated that machine utilization could be increased from 6% to 25%. Optimal solution strategies were formulated based on redesign budget, stressor cost, and estimates of solution costs and benefits

Miller, D.

1998-03-31T23:59:59.000Z

94

Predictive Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Maintenance Maintenance Predictive Maintenance October 7, 2013 - 9:46am Addthis Predictive maintenance aims to detect equipment degradation and address problems as they arise. The result indicates potential issues, which are controlled or eliminated prior to any significant system deterioration. Predictive maintenance differs from preventive maintenance because maintenance is based on the condition of the machine instead of a preset schedule. This eliminates the unneeded maintenance concerns of preventive programs. Several predictive maintenance technologies are available. Federal agencies can leverage a combination of these technologies within their maintenance programs. Advantages A well-executed predictive maintenance program can almost eliminate catastrophic equipment failure because issues are identified and eliminated

95

New Resin Improves Efficiency, Reduces Costs in Hanford Site Groundwater  

Broader source: Energy.gov (indexed) [DOE]

Resin Improves Efficiency, Reduces Costs in Hanford Site Resin Improves Efficiency, Reduces Costs in Hanford Site Groundwater Treatment New Resin Improves Efficiency, Reduces Costs in Hanford Site Groundwater Treatment March 1, 2012 - 12:00pm Addthis RICHLAND, Wash. - A new resin EM, the Richland Operations Office, and contractor CH2M HILL Plateau Remediation Company are using in contaminated groundwater treatment is expected to increase efficiency and reduce costs in the operation of pump-and-treat facilities along the Columbia River at the Hanford site. The higher performance resin, SIR-700, is expected to reduce DOE's estimated operation and maintenance costs over the lifetime of the 100-DX Groundwater Treatment Facility by approximately $20 million. In comparison to this expected cost savings, the construction cost for the treatment

96

MaintenanceRecords  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7BA003539 7BA003539 Maintenance Sheet for 2011 Hyundai Sonata Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 7/19/2011 5,720 Changed oil and filter $14.67 10/12/2011 11,152 Changed oil and filter and rotated tires $60.49 10/21/2011 12,342 Upgraded ECU (TG5), replaced NVLD pressure sensor (TG6), and replaced cooling fan resistor (TG8) warranty 11/21/2011 16,442 Changed oil and filter $43.22 12/20/2011 22,497 Changed oil and filter and rotated tires $56.85 1/24/2012 28,205 Changed oil and filter $41.85 2/6/2012 30,100 30K service $109.16 2/9/2012 30,460 Recall: replaced two high voltage connectors at the HPCU n/c 2/27/2012 33,208 Changed oil and filter and rotated tires $56.85 3/24/2012 40,809 Changed oil and filter $41.85 4/20/2012 47,580 Changed oil and filter and rotated tires

97

Risk-based Multiobjective Optimization Model for Bridge Maintenance Planning  

SciTech Connect (OSTI)

Determining the optimal maintenance plan is essential for successful bridge management. The optimization objectives are defined in the forms of minimizing life-cycle cost and maximizing performance indicators. Previous bridge maintenance models assumed the process of bridge deterioration and the estimate of maintenance cost are deterministic, i.e., known with certainty. This assumption, however, is invalid especially with estimates over a long time horizon of bridge life. In this study, we consider the risks associated with bridge deterioration and maintenance cost in determining the optimal maintenance plan. The decisions variables include the strategic choice of essential maintenance (such as silane treatment and cathodic protection), and the intervals between periodic maintenance. A epsilon-constrained Particle Swarm Optimization algorithm is used to approximate the tradeoff between life-cycle cost and performance indicators. During stochastic search for optimal solutions, Monte-Carlo simulation is used to evaluate the impact of risks on the objective values, at an acceptance level of reliability. The proposed model can facilitate decision makers to select the compromised maintenance plan with a group of alternative choices, each of which leads to a different level of performance and life-cycle cost. A numerical example is used to illustrate the proposed model.

Yang, I-T. [Associate Professor, National Taiwan University of Science and Technology (China); Hsu, Y.-S.

2010-05-21T23:59:59.000Z

98

Development of an Efficient Maintenance Scheme for Peak Efficiency of Boilers  

E-Print Network [OSTI]

AbstractPresently the world has enormous advancement in science and technology the topic considered here is just a drop out of an ocean of knowledge. Higher product quality, better reliability, better availability of plants, optimization of cost and efficient working of boilers is the chief concern now a days. Generally the production can be increased by the efficient use of boilers and hence there is a lot of scope to minimize the boiler operation cost. A boiler maintenance improvement program must include two aspects: (1) action to bring the boiler to peak efficiency and (2) action to maintain the efficiency at the maximum level. Good maintenance and efficiency start with having a working knowledge of the components associated with the boiler, keeping records, etc., and end with cleaning heat transfer surfaces, adjusting the air-to-fuel ratio, etc. A well-planned maintenance program avoids unnecessary down time or costly repairs. It also promotes safety and aids boiler code and local inspectors. An inspection schedule listing the procedures should be established. Thus in this paper an attempt is made to develop an efficient maintenance scheme by which boilers can be used with peak efficiency.

Amit Kumar Jain; Anupam Singhal

99

Home Maintenance Manual.  

E-Print Network [OSTI]

. College Station , Texas l Introduction A regular program of maintenance inspections can help homeowners identify and correct problems before they become serious. Unfortunately, a maintenance problem ignored becomes a major repair. Preventive... maintenance can extend the life of materials and equipment and will be less expensive in the long run than replacement. Maintaining a home need not be difficult, but it requires a regular program of inspection to identify and correct problems before...

Anonymous,

1985-01-01T23:59:59.000Z

100

Operation and Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

hosted by Western and requires a digital certificate and login for full access.) Contact Information Transmission Planning Western OATT Revision Maintenance Services Meter Policy...

Note: This page contains sample records for the topic "increased maintenance costs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

HVAC Maintenance and Technologies  

Broader source: Energy.gov [DOE]

Presentation covers the HVAC maintenance and technologies, and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

102

Solar Water Heating System Maintenance and Repair | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Water Heating System Maintenance and Repair Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair May 30, 2012 - 2:35pm Addthis Rooftop solar water heaters need regular maintenance to operate at peak efficiency. | Photo from iStockphoto.com Rooftop solar water heaters need regular maintenance to operate at peak efficiency. | Photo from iStockphoto.com Solar energy systems require periodic inspections and routine maintenance to keep them operating efficiently. Also, from time to time, components may need repair or replacement. You should also take steps to prevent scaling, corrosion, and freezing. You might be able to handle some of the inspections and maintenance tasks on your own, but others may require a qualified technician. Ask for a cost estimate in writing before having any work done. For some systems, it may

103

Method and computer program product for maintenance and modernization backlogging  

DOE Patents [OSTI]

According to one embodiment, a computer program product for determining future facility conditions includes a computer readable medium having computer readable program code stored therein. The computer readable program code includes computer readable program code for calculating a time period specific maintenance cost, for calculating a time period specific modernization factor, and for calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. In another embodiment, a computer-implemented method for calculating future facility conditions includes calculating a time period specific maintenance cost, calculating a time period specific modernization factor, and calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. Other embodiments are also presented.

Mattimore, Bernard G; Reynolds, Paul E; Farrell, Jill M

2013-02-19T23:59:59.000Z

104

E-Print Network 3.0 - agreement maintenance based Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Pave? Making Informed Decisions on When to Summary: A cost analysis based on spending history for low volume roads A method for estimating maintenance... in this study ...

105

Leptin increases maternal investment  

Science Journals Connector (OSTI)

...articles 1001 14 Leptin increases maternal investment Susannah S. French 1 * Timothy J...between self-maintenance and offspring investment when resources are limited. In the...effects of elevated maternal leptin on investment into offspring production versus self...

2009-01-01T23:59:59.000Z

106

Optimal forest management for carbon sequestration and biodiversity maintenance.  

E-Print Network [OSTI]

??Managing planted forests for carbon sequestration and biodiversity maintenance has become increasingly important in times of rapid climate change and the loss of biodiversity worldwide. (more)

Nghiem, Thi Hong Nhung

2011-01-01T23:59:59.000Z

107

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: Energy.gov (indexed) [DOE]

2 Why O&M? 2 Why O&M? � 2.1 Introduction Effective O&M is one of the most cost-effective methods for ensuring reliability, safety, and energy efficiency. Inadequate maintenance of energy-using systems is a major cause of energy waste in both the Federal Government and the private sector. Energy losses from steam, water and air leaks, uninsulated lines, maladjusted or inoperable controls, and other losses from poor maintenance are often considerable. Good maintenance practices can generate substantial energy savings and should be considered a resource. Moreover, improvements to facility maintenance programs can often be accomplished immediately and at a relatively low cost. 2.2 Definitions Operations and Maintenance are the decisions and actions regarding the control and upkeep of

108

Operations and Maintenance Program Structure  

Broader source: Energy.gov [DOE]

The Federal Energy Management Program recommends Federal operations and maintenance (O&M) programs comprise of five distinct functions: operations, maintenance, engineering, training, and...

109

Seasonal Landscape Maintenance  

E-Print Network [OSTI]

Seasonal Landscape Maintenance Oklahoma State University, in compliance with Title VI and VII State University's Department of Horticulture and Landscape Architecture and Oklahoma Cooperative to dry between watering allows plants to develop stronger, deeper roots. However, some landscape plants

Balasundaram, Balabhaskar "Baski"

110

Associate Vice Chancellor Maintenance  

E-Print Network [OSTI]

Engineering Capital Planning & Design Carpentry Shop Electrical Shop Plumbing Shop HVAC Shop Housing Shop Equipment & Vehicle Maintenance Warehouse Vehicle Pool Shuttle Post Office Parking Services Contract Management Water Distribution Heat & Power Generation Heat Distribution Power Distribution December 2012

Hartman, Chris

111

Utilization of municipal wastewater for cooling in thermoelectric power plants: Evaluation of the combined cost of makeup water treatment and increased condenser fouling  

SciTech Connect (OSTI)

A methodology is presented to calculate the total combined cost (TCC) of water sourcing, water treatment and condenser fouling in the recirculating cooling systems of thermoelectric power plants. The methodology is employed to evaluate the economic viability of using treated municipal wastewater (MWW) to replace the use of freshwater as makeup water to power plant cooling systems. Cost analyses are presented for a reference power plant and five different tertiary treatment scenarios to reduce the scaling tendencies of MWW. Results indicate that a 550 MW sub-critical coal fired power plant with a makeup water requirement of 29.3 ML/day has a TCC of $3.0 - 3.2 million/yr associated with the use of treated MWW for cooling. (All costs USD 2009). This translates to a freshwater conservation cost of $0.29/kL, which is considerably lower than that of dry air cooling technology, $1.5/kL, as well as the 2020 conservation cost target set by the U.S. Department of Energy, $0.74/kL. Results also show that if the available price of freshwater exceeds that of secondarytreated MWW by more than $0.13-0.14/kL, it can be economically advantageous to purchase secondary MWW and treat it for utilization in the recirculating cooling system of a thermoelectric power plant.

Walker, Michael E.; Theregowda, Ranjani B.; Safari, Iman; Abbasian, Javad; Arastoopour, Hamid; Dzombak, David A.; Hsieh, Ming-Kai; Miller, David C.

2013-10-01T23:59:59.000Z

112

Planning and optimizing the maintenance of paper production systems in a paper plant  

Science Journals Connector (OSTI)

Manufacturing and production plants operate physical assets that deteriorate with usage and time, thus, maintenance actions are required to restore the assets back to their original predetermined operational conditions. But since, organizational resources ... Keywords: Availability, Life cycle cost, Maintenance planning, Petri nets, Preventive maintenance, Simulink

Anish Sachdeva; Dinesh Kumar; Pradeep Kumar

2008-11-01T23:59:59.000Z

113

Energy efficiency improvement and cost saving opportunities for petroleum refineries  

E-Print Network [OSTI]

Technology to reduce Electric Motor Maintenance Costs.1998. United States Industrial Electric Motor Systems Marketof steam turbines or electric motors to run compressors. The

Worrell, Ernst; Galitsky, Christina

2005-01-01T23:59:59.000Z

114

Startup Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter discusses startup costs for construction and environmental projects, and estimating guidance for startup costs.

1997-03-28T23:59:59.000Z

115

Farm Out Maintenance Headaches  

Science Journals Connector (OSTI)

TIDEWATER OIL chalked up a number of firsts with its new Delaware refinery. The size and modern design of the plant drew a lot of attention and over-shadowed what may eventually be the most significant "first"contract instrument maintenance.At the giant ...

1957-08-26T23:59:59.000Z

116

Using Cable Suspended Submersible Pumps to Reduce Production Costs to Increase Ultimate Recovery in the Red Mountain Field of the San Juan Basin Region  

SciTech Connect (OSTI)

A joint venture between Enerdyne LLC, a small independent oil and gas producer, and Pumping Solutions Inc., developer of a low volume electric submersible pump, suspended from a cable, both based in Albuquerque, New Mexico, has re-established marginal oil production from Red Mountain Oil Field, located in the San Juan Basin, New Mexico by working over 17 existing wells, installing cable suspended submersible pumps ( Phase I ) and operating the oil field for approximately one year ( Phase II ). Upon the completion of Phases I and II ( Budget Period I ), Enerdyne LLC commenced work on Phase III which required additional drilling in an attempt to improve field economics ( Budget Period II ). The project was funded through a cooperative 50% cost sharing agreement between Enerdyne LLC and the National Energy Technology Laboratory (NETL), United States Department of Energy, executed on April 16, 2003. The total estimated cost for the two Budget Periods, of the Agreement, was $1,205,008.00 as detailed in Phase I, II & III Authorization for Expenditures (AFE). This report describes tasks performed and results experienced by Enerdyne LLC during the three phases of the cooperative agreement.

Don L. Hanosh

2006-08-15T23:59:59.000Z

117

Operations and Maintenance Program Measurement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Operations and Maintenance Program Measurement Operations and Maintenance Program Measurement Operations and Maintenance Program Measurement October 4, 2013 - 5:19pm Addthis Operations and maintenance (O&M) measurement tends to focus on reliability as the sole metric. Every Federal agency wants a reliable facility, but this metric alone is not enough to build a successful O&M program. O&M managers must think beyond reliability. Successful programs incorporate reliability along with controlling costs, evaluating and implementing new technologies, tracking and reporting health and safety issues, and more. Not only are these metrics useful in assessing effectiveness, but also in equipment cost justification, program modifications, and staff hiring. Common Metrics The following metrics are common in evaluating effective O&M programs. Not

118

Requirements-Based Surveillance and Maintenance Review Guide | Department  

Broader source: Energy.gov (indexed) [DOE]

Requirements-Based Surveillance and Maintenance Review Guide Requirements-Based Surveillance and Maintenance Review Guide Requirements-Based Surveillance and Maintenance Review Guide Use of the Guidance Manual This manual was developed to provide organizations with the knowledge and tools necessary to perform a disciplined and thorough Requirements-Based Surveillance and Maintenance (RBSM) review at any given facility or site in order to cost effectively manage S&M activities. Sections 1.0, 2.0 and 3.0 of this manual provide a brief explanation of what the RBSM review process is, why such a process is needed and the steps a facility or site should take to get organized and initiate an RBSM review. Sections 4.0 and 5.0 of this manual discuss the use of the data gained from the RBSM review process like the development of cost reduction strategies and the development of

119

Optimum maintenance strategy under uncertainty in the lifetime distribution  

Science Journals Connector (OSTI)

Abstract The problem of determining the optimal maintenance strategy for a machine given its lifetime distribution has been studied extensively. Solutions to this problem are outlined in the academic literature, prescribed in professional handbooks, implemented in reliability engineering software systems and widely used in practice. These solutions typically assume that the lifetime distribution and its parameter values are known with certainty, although this is usually not the case in practice. In this paper we study the effect of parameter uncertainty on the optimum age-based maintenance strategy. The effect of uncertainty is evaluated by considering both a theoretical uniform lifetime distribution and a more realistic Weibull lifetime distribution. The results show that admitting to the uncertainty does influence the optimal maintenance age and also provides a quantifiable cost benefit. The results can help maintenance managers in making maintenance decisions under uncertainty, and also in deciding when it is worthwhile to invest in advanced data improvement procedures.

Bram de Jonge; Warse Klingenberg; Ruud Teunter; Tiedo Tinga

2015-01-01T23:59:59.000Z

120

Reactive Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Reactive Maintenance Reactive Maintenance Reactive Maintenance October 7, 2013 - 9:40am Addthis Reactive maintenance follows a run-it-until-it-breaks strategy where no actions or efforts are taken to maintain equipment as intended by the manufacturer. Studies indicate this is still the predominant mode of maintenance for Federal facilities. Advantages Reactive maintenance advantages are a double-edged sword. Federal agencies following a purely reactive maintenance strategy can expect little expenditures for manpower or system upkeep until something breaks. However, systems do break. With new equipment, Federal agencies can expect minimal incidents of failure. However, older equipment often experiences higher failure incidents and costlier repairs. Other advantages of reactive maintenance are:

Note: This page contains sample records for the topic "increased maintenance costs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

The Maintenance of Solar Energy  

Science Journals Connector (OSTI)

... this short essay is not satisfied with the current ideas as to the maintenance of solar ...solarenergy ...

1899-10-26T23:59:59.000Z

122

Early Station Costs Questionnaire  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Early Station Costs Questionnaire Early Station Costs Questionnaire Marc Melaina Hydrogen Technologies and Systems Center Market Readiness Workshop February 16-17th, 2011 Washington, DC Questionnaire Goals * The Early Station Costs questionnaire provides an anonymous mechanism for organizations with direct experience with hydrogen station costs to provide feedback on current costs, near-term costs, economies of scale, and R&D priorities. * This feedback serves the hydrogen community and government agencies by increasing awareness of the status of refueling infrastructure costs National Renewable Energy Laboratory Innovation for Our Energy Future Questions for Market Readiness Workshop Attendees * Are these questions the right ones to be asking?

123

HVAC Maintenance and Technologies  

Broader source: Energy.gov (indexed) [DOE]

HVAC - HVAC - Maintenance and Technologies Federal Utility Partnership Working Group Meeting Providence, Rhode Island April 15, 2010 BY Ramin Faramarzi, P.E. Technology Test Centers (TTC) Design and Engineering Services Southern California Edison (SCE) www.sce.com/rttc 2 Outline * Introduction to SCE's TTC * Overview of energy challenges in California (CA) * Role of HVAC in CA's energy and demand equations * Factors affecting HVAC performance * Focus on SCE's research on maintenance faults * Next generation of HVAC equipment * HVAC technologies on SCE's TTC radar * Black boxes - do they all work? 3 SCE's Technology Test Centers * SCE applied research facilities located in Irwindale, CA comprised of 3 test beds: * Refrigeration * HVAC * Lighting * Coming Soon! - A new ZNE lab 4 Refrigeration Testing

124

care and maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Care and Maintenance of the Prairie Parcel Care and Maintenance of the Prairie Parcel Now that your prairie parcel is up and growing, there are just a few concerns that you should consider about its care. Weeding The question of weeding is really just a matter of aesthetics. You do not have to weed your parcel. If your parcel is a large one, weeding may not even be practical. Although the "weed" species will dominate your parcel for the first few years, they will give way to the native plant species. You can liken the native plants to long distance runners; they appear to start off slowly, but end up winning the ecological race. After all, they are the plants that are genetically-suited and adapted to growing in this environment. The native prairie plants will be developing extensive root structure the

125

Reliability centered maintenance (RCM) for substations project overview  

SciTech Connect (OSTI)

An EPRI Tailored Collaboration project establishing guidelines and tools for implementing Reliability Centered Maintenance (RCM) in substations is nearing completion and final results are being presented at this Substation RCM Conference. The ultimate goal of this RCM project is to help utilities slash substation operations and maintenance costs by optimizing equipment maintenance intervals. Preventive maintenance (PM) programs typically have been developed on a component-by-component basis, relying heavily on equipment vendors` maintenance recommendations. RCM is a logical alternative to traditional PM programs. It is intelligent, common sense maintenance that is function-based rather than component-based. First developed by the airline industry in the 1960s and further developed and applied to the nuclear industry by EPRI in the 1980s, RCM ranks the importance of each function of a system, calculates the impact the loss of the function would have on the overall system, and drives the design of appropriate maintenance tasks for each function. The nuclear industry reaped savings of at least 25% by adopting RCM, and one utility that tried this approach for substation maintenance reported savings of 13% in one year.

Lyons, P.F.

1996-08-01T23:59:59.000Z

126

Development and testing of a low-maintenance, energy-absorbing bridge rail  

E-Print Network [OSTI]

vehicle leaves the flow of traffic and strikes a bridge rail. The second concern is for the safety of the maintenance workers who must repair bridge rail damage following a collision. Third, the increasing cost of maintaining br idge decks and rails... during a more severe collision. Furthermore, the new bridge rail is designed to fit either new or existing standard bridge decks. Following development of the new bridge rail, two full-scale vehicle crash-tests were performed at the TTI Research...

Cain, John Craig

2012-06-07T23:59:59.000Z

127

The hydrogen value chain: applying the automotive role model of the hydrogen economy in the aerospace sector to increase performance and reduce costs  

Science Journals Connector (OSTI)

Hydrogen will assume a key role in Europe's effort to adopt its energy dependent society to satisfy its needs without releasing vast amounts of greenhouse gases. The paradigm shift is so paramount that one speaks of the Hydrogen Economy, as the energy in this new and ecological type of economy is to be distributed by hydrogen. However, H2 is not a primary energy source but rather an energy carrier, a means of storing, transporting and distributing energy, which has to be generated by other means. Various H2 storage methods are possible; however industries' favourite is the storage of gaseous hydrogen in high pressure tanks. The biggest promoter of this storage methodology is the automotive industry, which is currently preparing for the generation change from the fossil fuel internal combustion engines to hydrogen based fuel cells. The current roadmaps foresee a market roll-out by 2015, when the hydrogen supply infrastructure is expected to have reached a critical mass. The hydrogen economy is about to take off as being demonstrated by various national mobility strategies, which foresee several millions of electric cars driving on the road in 2020. Fuel cell cars are only one type of electric car, battery electric as well as hybrid cars all featuring electric drive trains are the others. Which type of technology is chosen for a specific application depends primarily on the involved energy storage and power requirements. These considerations are very similar to the ones in the aerospace sector, which had introduced the fuel cell already in the 1960s. The automotive sector followed only recently, but has succeeded in moving forward the technology to a level, where the aerospace sector is starting considering to spin-in terrestrial hydrogen technologies into its technology portfolio. Target areas are again high power/high energy applications like aviation, manned spaceflight and exploration missions, as well as future generation high power telecommunication satellites. Similar trends can be expected in the future for RADAR Earth Observation satellites and space infrastructure concepts of great scale. This paper examines current activities along the hydrogen value chain, both in the terrestrial and the aerospace sector. A general assessment of the synergy potential is complemented by a thorough analysis of specific applications serving as role models like a lunar manned base or pressurised rover, an aircraft APU or a high power telecommunications satellite. Potential performance improvements and cost savings serve as key performance indicators in these comparisons and trade-offs.

Norbert Frischauf; Beatriz Acosta-Iborra; Frederik Harskamp; Pietro Moretto; Thomas Malkow; Michel Honselaar; Marc Steen; Scott Hovland; Bernhard Hufenbach; Max Schautz; Manfred Wittig; Alexander Soucek

2013-01-01T23:59:59.000Z

128

Federal Energy Management Program: Maintenance Types  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Maintenance Types Maintenance Types to someone by E-mail Share Federal Energy Management Program: Maintenance Types on Facebook Tweet about Federal Energy Management Program: Maintenance Types on Twitter Bookmark Federal Energy Management Program: Maintenance Types on Google Bookmark Federal Energy Management Program: Maintenance Types on Delicious Rank Federal Energy Management Program: Maintenance Types on Digg Find More places to share Federal Energy Management Program: Maintenance Types on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types Resources Contacts

129

Cost analysis guidelines  

SciTech Connect (OSTI)

The first phase of the Depleted Uranium Hexafluoride Management Program (Program)--management strategy selection--consists of several program elements: Technology Assessment, Engineering Analysis, Cost Analysis, and preparation of an Environmental Impact Statement (EIS). Cost Analysis will estimate the life-cycle costs associated with each of the long-term management strategy alternatives for depleted uranium hexafluoride (UF6). The scope of Cost Analysis will include all major expenditures, from the planning and design stages through decontamination and decommissioning. The costs will be estimated at a scoping or preconceptual design level and are intended to assist decision makers in comparing alternatives for further consideration. They will not be absolute costs or bid-document costs. The purpose of the Cost Analysis Guidelines is to establish a consistent approach to analyzing of cost alternatives for managing Department of Energy`s (DOE`s) stocks of depleted uranium hexafluoride (DUF6). The component modules that make up the DUF6 management program differ substantially in operational maintenance, process-options, requirements for R and D, equipment, facilities, regulatory compliance, (O and M), and operations risk. To facilitate a consistent and equitable comparison of costs, the guidelines offer common definitions, assumptions or basis, and limitations integrated with a standard approach to the analysis. Further, the goal is to evaluate total net life-cycle costs and display them in a way that gives DOE the capability to evaluate a variety of overall DUF6 management strategies, including commercial potential. The cost estimates reflect the preconceptual level of the designs. They will be appropriate for distinguishing among management strategies.

Strait, R.S.

1996-01-10T23:59:59.000Z

130

Lawn Maintenance Safety  

E-Print Network [OSTI]

with lawn and garden tools, more than half involving riding lawn mowers and garden tractors. You can avoid accidents like these by making safety a regular part of lawn maintenance, particularly when using lawn mowers and other power tools. Lawn Mowers... mowers save homeowners valuable time and energy. These small tractors are much more powerful than walk-behind mowers and move two to three times as fast. To avoid accidents on riding mowers or larger tractors, it is important to use safe driving...

Smith, David

2005-07-12T23:59:59.000Z

131

NREL Improves System Efficiency and Increases Energy Transfer with Wind2H2 Project, Enabling Reduced Cost Electrolysis Production (Fact Sheet), Hydrogen and Fuel Cell Technical Highlights (HFCTH)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 * November 2010 5 * November 2010 Energy transfer improvements from the 10-kW wind turbine tested by NREL. The graph shows successive improvement, including the latest preliminary third generation improvement in the green shaded area. Increased Energy Transfer: NREL continues to improve energy transfer from a 10-kW solar PV array, comparing directly coupling the PV array to the electrolyzer stack with a connection through a maximum power point tracking (MPPT) power electronics package designed at NREL. The experimental testing (above) revealed that direct coupling outperformed power electronics when solar irradiance levels are below 500 W/m 2 while the MPPT power converter delivered more energy to the stacks between 500 and 1,100 W/m 2 . These findings

132

Power Plant Cycling Costs  

SciTech Connect (OSTI)

This report provides a detailed review of the most up to date data available on power plant cycling costs. The primary objective of this report is to increase awareness of power plant cycling cost, the use of these costs in renewable integration studies and to stimulate debate between policymakers, system dispatchers, plant personnel and power utilities.

Kumar, N.; Besuner, P.; Lefton, S.; Agan, D.; Hilleman, D.

2012-07-01T23:59:59.000Z

133

Maintenance strategies to improve sootblower availability  

SciTech Connect (OSTI)

Sootblowers are electromechanical devices used for removal of ash and slag deposits from boiler tube surfaces. By directing steam, air, or water cleaning medium through a nozzle to remove deposits from boiler tubes, boilers are kept on-line for longer periods of time reducing the need for outages to clean the boiler by mechanical means. Fuel must be burned efficiently to minimize stagging and fouling of the heat transfer surfaces. Tuning the boiler to maximize combustion efficiency should not be limited to optimizing fuel conditions, air-fuel ratios, firing rates, excess air, and over-fire air, but should also include the use of sootblowers. The goal is to know when to clean, and if the cleaning cycle has effectively removed the deposit and increased heat transfer. Today, boiler cleaning technology not only focuses on the impact of the sootblowing system on overall boiler performance, but it also focuses on design improvements that impact an individual sootblower`s performance. Proper sootblower maintenance is an integral part of making existing designs and new designs work. Existing computer technologies provide a viable means of documenting and trending sootblower performance data and maintenance history. The personal computer and the availability of spreadsheet and database software make the task of quantifying sootblower performance data and maintenance history easier to achieve. The difficult task is gathering the proper data to make decisions about sootblowing operations and maintenance. The balance of this paper will discuss typical maintenance practices, and improvements that can be achieved by documenting sootblowing system inspections and maintenance activity using a personal computer database.

Walther, J.M.; Whitehead, B.K.

1996-07-01T23:59:59.000Z

134

Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance  

Broader source: Energy.gov (indexed) [DOE]

Final July 01, 2010 Final July 01, 2010 1 Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance On Real Property 1. The following is the FY 2010 implementation procedures for the field offices/sites to determine and report deferred maintenance on real property as required by the Statement of Federal Financial Accounting Standards (SFFAS) No. 6, Accounting for Property, Plant, and Equipment (PP&E) and DOE Order 430.1B, Real Property Asset Management (RPAM). a. This document is intended to assist field offices/sites in consistently and accurately applying the appropriate methods to determine and report deferred maintenance estimates and reporting of annual required and actual maintenance costs. b. This reporting satisfies the Department's obligation to recognize and record deferred

135

Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance  

Broader source: Energy.gov (indexed) [DOE]

Draft July 9, 2009 Draft July 9, 2009 1 Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance On Real Property 1. The following is the FY 2009 implementation procedures for the field offices/sites to determine and report deferred maintenance on real property as required by the Statement of Federal Financial Accounting Standards (SFFAS) No. 6, Accounting for Property, Plant, and Equipment (PP&E) and DOE Order 430.1B, Real Property Asset Management (RPAM). a. This document is intended to assist field offices/sites in consistently and accurately applying the appropriate methods to determine and report deferred maintenance estimates and reporting of annual required and actual maintenance costs. b. This reporting satisfies the Department's obligation to recognize and record deferred

136

Federal Requirements for Operations and Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Operations & Maintenance » Federal Requirements Operations & Maintenance » Federal Requirements for Operations and Maintenance Federal Requirements for Operations and Maintenance October 4, 2013 - 5:09pm Addthis The following laws and regulations set advanced metering and measurement requirements for Federal agencies. Energy Policy Act (EPAct) of 2005: Requires all Federal buildings to be metered by October 1, 2012, to ensure efficient energy use and reduce the cost of electricity used in Federal facilities. Advanced meters or metering devices must provide data at least daily and measure the consumption of electricity at least hourly. These devices must be used to the maximum extent practical. Requires Federal agencies to submit to the U.S. Department of Energy (DOE) an implementation plan identifying personnel responsible for achieving

137

Reliability-Centered Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Reliability-Centered Maintenance Reliability-Centered Maintenance Reliability-Centered Maintenance October 7, 2013 - 9:48am Addthis Reliability-centered maintenance leverages the same practices and technologies of predictive maintenance. The difference is that reliability-centered maintenance recognizes that: Equipment design and operations differ Different equipment has different probabilities of failure All equipment is not of equal importance to facility operations Facilities have limited financial and personnel resources. While reliability-centered maintenance relies on predictive maintenance practices and technologies, it also recognizes that maintenance on inexpensive and/or unimportant equipment may be better served by a reactive or predictive maintenance approach. Each of the aforementioned factors are

138

Federal Energy Management Program: Reactive Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Reactive Reactive Maintenance to someone by E-mail Share Federal Energy Management Program: Reactive Maintenance on Facebook Tweet about Federal Energy Management Program: Reactive Maintenance on Twitter Bookmark Federal Energy Management Program: Reactive Maintenance on Google Bookmark Federal Energy Management Program: Reactive Maintenance on Delicious Rank Federal Energy Management Program: Reactive Maintenance on Digg Find More places to share Federal Energy Management Program: Reactive Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types

139

Federal Energy Management Program: Operations and Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Operations and Operations and Maintenance to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance on Google Bookmark Federal Energy Management Program: Operations and Maintenance on Delicious Rank Federal Energy Management Program: Operations and Maintenance on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Major Equipment Types Resources

140

Federal Energy Management Program: Preventive Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Preventive Preventive Maintenance to someone by E-mail Share Federal Energy Management Program: Preventive Maintenance on Facebook Tweet about Federal Energy Management Program: Preventive Maintenance on Twitter Bookmark Federal Energy Management Program: Preventive Maintenance on Google Bookmark Federal Energy Management Program: Preventive Maintenance on Delicious Rank Federal Energy Management Program: Preventive Maintenance on Digg Find More places to share Federal Energy Management Program: Preventive Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types

Note: This page contains sample records for the topic "increased maintenance costs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Tim Kuneli, Electronics Maintenance Group  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tim Kuneli, Electronics Maintenance Group Print The recent ALS power supply failure was one of the most challenging projects that Electronics Engineer Technical Superintendent Tim...

142

Sustainability of green space maintenance  

E-Print Network [OSTI]

In Japan, recent changes in socio-economic and political structures -- decreasing tax revenue, declining communication among community members, and privatization of public services-- have influenced existing maintenance ...

Nomura, Wataru

2011-01-01T23:59:59.000Z

143

Maintenance Types | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

prevent failure, or ensure life of the system even if actions are suggested by the manufacturer. Preventive Maintenance: Refers to a series of actions performed on calendar time...

144

Mechanical Operations and Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Holiday Work Status Holiday Work Status Mechanical Operations & Maintenance Group APS Storage Ring Magnets The Advanced Photon Source (APS) at the Argonne National Laboratory is a national synchrotron-radiation research facility funded by the U.S. Department of Energy. Using high-brilliance x-ray beams from the APS, an international community of scientists conducts forefront basic and applied research in the fields of material science, biological science, physics, chemistry, environmental, geophysical and planetary science. The 1.1-km circumference APS facility consists of several major subsystems including magnets, vacuum chambers, radio-frequency cavities, diagnostics instrumentation, x-ray absorbers and apertures, and cooling water subsystems. Each of these subsystems contains hundreds of mechanical

145

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: Energy.gov (indexed) [DOE]

1.1 1.1 Chapter 11 Ten Steps to Operational Efficiency Step 1: Strive to increase management awareness and appreciation of the operations and maintenance program/department. * Consider developing a maintenance mission statement and requesting/requiring management sign-off. * Consider developing a maintenance plan and requesting/requiring management sign-off. * Begin the development of the OMETA linkages. - Develop key points of contact within other departments that can participate in the O&M mission. Step 2: Commit to begin tracking Operations and Maintenance activities. * Need to understand where O&M time is spent. * Need to understand where O&M dollars are spent. * Consider (strongly) purchasing or enhancing a Computerized Maintenance Management

146

Landscape Maintenance Considerations for Homeowner  

E-Print Network [OSTI]

Landscape Maintenance Considerations for Homeowner Associations: Save Money, Be Safe, Look Good is getting their money's worth from the landscape maintenance company. Photo credit: Asset Landscaping! Kelly Murray Young Haley Paul #12;1. Consider landscape plants a long- term investment · Trees

Sanderson, Mike

147

OpenEI Community - Maintenance  

Open Energy Info (EERE)

maintenance maintenance March 8-9, 2013 http://en.openei.org/community/blog/openei-maintenance-march-8-9-2013  We would like to inform the OpenEI community that OpenEI will be undergoing a significant software upgrade during a maintenance window this weekend.  We will be upgrading the wiki and semantic mediawiki portions of OpenEI, which means /datasets, /apps, /lod, /sparql and /community will continue to function normally.  Additionally, web services that rely on Ask queries (utility rate database API) may have some downtime as we transition.maintenance-march-8-9-2013" target="_blank">read more

148

Federal Energy Management Program: Predictive Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to someone by E-mail to someone by E-mail Share Federal Energy Management Program: Predictive Maintenance on Facebook Tweet about Federal Energy Management Program: Predictive Maintenance on Twitter Bookmark Federal Energy Management Program: Predictive Maintenance on Google Bookmark Federal Energy Management Program: Predictive Maintenance on Delicious Rank Federal Energy Management Program: Predictive Maintenance on Digg Find More places to share Federal Energy Management Program: Predictive Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types Resources

149

Maintenance cost studies of rotary wing commercial transport aircraft  

E-Print Network [OSTI]

Introduction: The vertical take-off and landing (VTOL) aircraft market has had substantial growth in the period of the last ten years when one considers the overall number of aircraft in use. The military fleet has continued ...

Ausrotas, Raymond A.

1974-01-01T23:59:59.000Z

150

Online Monitoring to Enable Improved Diagnostics, Prognostics and Maintenance  

SciTech Connect (OSTI)

For both existing and new plant designs there are increasing opportunities and needs for the application of advanced online surveillance, diagnostic and prognostic techniques. These methods can continuously monitor and assess the health of nuclear power plant systems and components. The added effectiveness of such programs has the potential to enable holistic plant management, and minimize exposure to future and unknown risks. The 'NDE & On-line Monitoring' activities within the Advanced Instrumentation, Information and Control Systems (II&CS) Pathway are developing R&D to establish advanced condition monitoring and prognostics technologies to understand and predict future phenomena, derived from plant aging in systems, structures, and components (SSC). This research includes utilization of the enhanced functionality and system condition awareness that becomes available through the application of digital technologies at existing nuclear power plants for online monitoring and prognostics. The current state-of-the-art for on-line monitoring applied to active components (eg pumps, valves, motors) and passive structure (eg core internals, primary piping, pressure vessel, concrete, cables, buried pipes) is being reviewed. This includes looking at the current deployment of systems that monitor reactor noise, acoustic signals and vibration in various forms, leak monitoring, and now increasingly condition-based maintenance (CBM) for active components. The NDE and on-line monitoring projects are designed to look beyond locally monitored CBM. Current trends include centralized plant monitoring of SSC, potential fleet-based CBM and technology that will enable operation and maintenance to be performed with limited on-site staff. Attention is also moving to systems that use online monitoring to permit longer term operation (LTO), including a prognostic or predictive element that estimates a remaining useful life (RUL). Many, if not all, active components (pumps, valves, motors etc.) can be well managed, routinely diagnosed, analyzed and upgraded as needed using a combination of periodic and online CBM. The ability to successfully manage passive systems and structures is seen as the key to LTO, particularly in the USA. New approaches will be demonstrated, including prognostics for passive structures, which is critical to maintaining safety and availability and to reducing operations and maintenance costs for NPP's. To provide proactive on-line monitoring that includes estimates for RUL new projects will include advanced sensors, better understanding of stressors and challenges faced in quantification of uncertainty associated with RUL. This program area will leverage insights from past experience in other industries and seek to demonstrate the feasibility of on-line monitoring and prognostics to support NPP LTO.

Bond, Leonard J.

2011-02-01T23:59:59.000Z

151

Practical Maintenance of Digital Systems: Guidance to Maximize the Benefits of Digital Technology for the Maintenance of Digital Systems and Plant Equipment  

SciTech Connect (OSTI)

This report presents detailed guidance for the maintenance and testing of modern digital systems. The guidance provides practical means for plants to take advantage of the increased diagnostic and self-test capabilities of these systems. It helps plants avoid mistakes in design and installation that could lead to increased maintenance burden and decreased system reliability and availability.

Hill, D; Scarola, K

2004-10-30T23:59:59.000Z

152

Federal Energy Management Program: Computerized Maintenance Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Computerized Computerized Maintenance Management Systems to someone by E-mail Share Federal Energy Management Program: Computerized Maintenance Management Systems on Facebook Tweet about Federal Energy Management Program: Computerized Maintenance Management Systems on Twitter Bookmark Federal Energy Management Program: Computerized Maintenance Management Systems on Google Bookmark Federal Energy Management Program: Computerized Maintenance Management Systems on Delicious Rank Federal Energy Management Program: Computerized Maintenance Management Systems on Digg Find More places to share Federal Energy Management Program: Computerized Maintenance Management Systems on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

153

Operations and Maintenance | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Operations and Maintenance Operations and Maintenance Federal facilities rely on pumps, motors, fans, and other mechanical systems for everyday operations. These systems must be...

154

Operations and Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Operations and Maintenance Operations and Maintenance Federal facilities rely on pumps, motors, fans, and other mechanical systems for everyday operations. These systems...

155

Chapter 5 Airline Operating Costs and Measures of Productivity Learning Objectives  

E-Print Network [OSTI]

personnel) Materials Purchased (fuel & oil, parts, passenger food, other materials) Services Purchased airframe and engine maintenance cost, plus "burden" or overhead (hangars and spare parts inventory

156

Operations and Maintenance Management Support  

Broader source: Energy.gov [DOE]

Federal operations and maintenance (O&M) programs must gain full support from management to succeed. Management understanding and buying into the program elevates O&M importance and allows...

157

Cleaning, Maintenance, and Janitorial Needs  

Science Journals Connector (OSTI)

The contamination control facility, including all items that may come into contact with products, requires regular maintenance and cleaning. The products produced in the cleanroom facility are typically sensitive...

Alvin Lieberman

1992-01-01T23:59:59.000Z

158

Sustainable Operations & Maintenance Implementation Support  

E-Print Network [OSTI]

, and purchasing policy: Energy efficiency cannot exist without accountability and organizational support energy efficiency in buildings. Organizational innovation for energy conservation; Organizations face of energy efficiency. Meetings with facilities personnel, maintenance staff, building managers, building oc

159

Maintenance Practices for LED Streetlights  

Broader source: Energy.gov [DOE]

This April 14, 2014 webinar answered important questions about the maintenance and reliability of LED streetlights, and how to take these issues into account when planning and preparing for a...

160

Operations and Maintenance Program Measurement  

Broader source: Energy.gov [DOE]

Operations and maintenance (O&M) measurement tends to focus on reliability as the sole metric. Every Federal agency wants a reliable facility, but this metric alone is not enough to build a...

Note: This page contains sample records for the topic "increased maintenance costs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Cost Estimator  

Broader source: Energy.gov [DOE]

A successful candidate in this position will serve as a senior cost and schedule estimator who is responsible for preparing life-cycle cost and schedule estimates and analyses associated with the...

162

Operating Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

1997-03-28T23:59:59.000Z

163

WVU Personal Rapid Transit Benefit Cost Analysis  

E-Print Network [OSTI]

....................................................................... 6 Demographic Trends - Engineering Station .................................................................... 7 Demographic Trends - Engineering Station ............................................................................. 18 Economic Cost of Increased Congestion

Mohaghegh, Shahab

164

Maintenance of DOE Technical Standards  

Broader source: Energy.gov (indexed) [DOE]

TECHNICAL STANDARDS TECHNICAL STANDARDS PROGRAM PROCEDURES DOE-TSPP-9 Revision: 5 Date: August 1, 2000 MAINTENANCE OF DOE TECHNICAL STANDARDS U.S. Department of Energy Office of Nuclear Safety Policy and Standards Washington, D.C. 20585 DOE-TSPP-9 Maintenance Revision: 5 Date: August 1, 2000 DOE Technical Standards Program i CONTENTS Paragraph Page 1. SCOPE........................................................................................................................................... 1 1.1 Purpose ................................................................................................................... 1 1.2 Applicability.............................................................................................................. 1

165

Geothermal power plant R and D: an analysis of cost-performance tradeoffs and the Heber Binary-Cycle Demonstration Project  

SciTech Connect (OSTI)

A study of advancements in power plant designs for use at geothermal resources in the low to moderate (300 to 400F) temperature range is reported. In 3 case studies, the benefits of R and D to achieve these advancements are evaluated in terms of expected increases in installed geothermal generating capacity over the next 2 decades. A parametric sensitivity study is discussed which analyzes differential power development for combinations of power plant efficiency and capitol cost. Affordable tradeoffs between plant performance and capital costs are illustrated. The independent review and analysis of the expected costs of construction, operation and maintenance of the Heber Binary Cycle Geothermal Power Demonstration Plant are described. Included in this assessment is an analysis of each of the major cost components of the project, including (1) construction cost, (2) well field development costs, (3) fluid purchase costs, and (4) well field and power plant operation and maintenance costs. The total cost of power generated from the Heber Plant (in terms of mills per kWh) is then compared to the cost of power from alternative fossil-fueled base load units. Also evaluated are the provisions of both: (a) the Cooperative Agreement between the federal government and San Diego Gas and Electric (SDG and E); and (b) the Geothermal Heat Sales Contract with Union Oil Company.

Cassel, T.A.V.; Amundsen, C.B.; Blair, P.D.

1983-06-30T23:59:59.000Z

166

Industrial heat pumps - types and costs  

SciTech Connect (OSTI)

Confusion about energy savings and economics is preventing many potentially beneficial applications for industrial heat pumps. The variety of heat pumps available and the lack of a standard rating system cause some of this confusion. The authors illustrate how a simple categorization based on coefficient of performance (COP) can compare the cost of recovering waste energy with heat pumps. After evaluating examples in which the cost of energy delivered was calculated based on estimates of capital cost, operating costs, and maintenance costs, they compare heat pumps from the various categories on the basis of economics. 6 references, 6 figures, 1 table.

Chappell, R.N.; Bliem, C.J. Jr.; Mills, J.I.; Demuth, O.J.; Plaster, D.S.

1985-08-01T23:59:59.000Z

167

Cost of Fuel to General Electricity  

Broader source: Energy.gov (indexed) [DOE]

of Fuel to Generate Electricity of Fuel to Generate Electricity Cost of Fuel to Generate Electricity Herb Emmrich Gas Demand Forecast, Economic Analysis & Tariffs Manager SCG/SDG&E SCG/SDG&E Federal Utility Partnership Working Group (FUPWG) 2009 Fall Meeting November 18, 2009 Ontario, California The Six Main Costs to Price Electricity are:  Capital costs - the cost of capital investment (debt & equity), depreciation, Federal & State income taxes and property taxes and property taxes  Fuel costs based on fuel used to generate electricity - hydro, natural gas, coal, fuel oil, wind, solar, photovoltaic geothermal biogas photovoltaic, geothermal, biogas  Operating and maintenance costs  Transmission costs  Distribution costs  Social adder costs - GHG adder, low income adder,

168

Cost Shifting  

Science Journals Connector (OSTI)

Abstract Cost shifting exists when a provider raises prices for one set of buyers because it has lowered prices for some other buyer. In theory, cost shifting can take place only if providers have unexploited market power. The empirical evidence on the extent of cost shifting is mixed. Taken as a whole, the evidence does not support the claims that cost shifting is a large and pervasive feature of the US health-care markets. At most, one can argue that perhaps one-fifth of Medicare payment reductions have been passed on to private payers. The majority of the rigorous studies, however, have found no evidence of cost shifting.

M.A. Morrisey

2014-01-01T23:59:59.000Z

169

Steam turbine path evaluation during maintenance  

SciTech Connect (OSTI)

The deterioration of a turbine (Steam & Gas) flow path affects the efficiency of the turbine. The most critical factors which affect the efficiency of turbines are: wearing out of the trailing edges of the blades by solid particle erosion, deposits, material loss due to corrosion (also sand blast) which increases the flow area, increases in blade surface roughness, etc. Wearing out of the seals caused by shaft vibrations or rapid start-up leads to significant leakage losses. Some of these effects can be estimated with some precision during operation of the turbine, but an exact evaluation can be carried out during a maintenance applying a special fluid flow analysis program. Such a program has been developed and then adapted to achieve this goal. During maintenance the complete geometry of the steam path is measured (blades lengths, widths, angles, clearances, etc.) in the condition encountered before any corrections. Then the similar measurement is undertaken after, for example, clearance corrections, blade replacements, cleaning of the blades, etc. Using the program first of all the design data is calculated. Then the actual data is fed into the program and compared to the design data. Thus the effect of the blade surface roughness, increased seal clearances, flow area increase, solid particle damage to the trailing edge and so on for each particular stage is calculated. The effect is expressed in [kW] as a deviation from the design points. This data can be helpful during online evaluation of the turbine performance. This evaluation helps the management of the plant in undertaking the correct decision concerning the date of the next major maintenance and replacement part procurement. Many turbines in the Mexican utility have been evaluated in such a manner. Some examples are presented.

Kubiak, J.; Angel, F. del; Carnero, A.; Campos, A. [Instituto de Investigaciones Electricas, Temixo, Morelos (Mexico)] [and others

1996-07-01T23:59:59.000Z

170

Operations & Maintenance Best Practices Guide: Chapter 3  

Broader source: Energy.gov [DOE]

Guide describes chapter 3 of the Operations & Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

171

Chapter 6.14 PROPERTY MAINTENANCE  

E-Print Network [OSTI]

Chapter 6.14 PROPERTY MAINTENANCE Sections: 6.14.010 Findings. 6.14.020 Landscape Maintenance. 6 of landscaping and/or landscape maintenance on private property, including overgrown, dead, or decayed vegetation of the residents of the City of Riverside. (Ord. 6970 § 2, 2007) Section 6.14.020 Landscape maintenance. A

Lyubomirsky, Ilya

172

Module 10: Maintenance and Fueling Guidelines  

Broader source: Energy.gov [DOE]

This course covers safety guidelines for hydrogen, safe maintenance facilities, safety guidelines for hydrogen fueling facilities

173

CRAD, Maintenance Assessment Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Maintenance Assessment Plan Maintenance Assessment Plan CRAD, Maintenance Assessment Plan Performance Objective: An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations. Criteria: The program, facility or operation has a Maintenance Implementation Plan (MIP), or equivalent document, which defines and documents the approach to conduct of maintenance. The maintenance organization structure is well defined and understood. Responsibilities, organizational interfaces, and administrative activities are adequately defined and implemented to provide timely availability of parts, materials, and services needed to support the

174

Benchmarking of maintenance performance: a case study in two manufacturers of furniture  

Science Journals Connector (OSTI)

......production speed and operating/running times...in equipment and personnel to avoid longer...usually provided by training. Using the five...conjunction with operating cost and OPE would...maintenance performance, operating and quality costs...1991) On the selection of condition based......

Basim Al-Najjar; Mats-Ola Hansson; Patrik Sunnegrdh

2004-07-01T23:59:59.000Z

175

cost savings  

National Nuclear Security Administration (NNSA)

reduced the amount of time involved in the annual chemical inventory for a cost savings of 18,282. Other presentations covered SRNS' award-winning employee suggestion...

176

BPA's Costs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BPAsCosts Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects & Initiatives Finance & Rates...

177

The effects of the implementation of grey water reuse systems on construction cost and project schedule  

E-Print Network [OSTI]

a positive or negative effect on the design teams decision to implement a grey water reuse system: capital cost, maintenance cost, LEED credits, local plumbing codes, project schedule, local water conservation issues, complexity of the system, etc...

Kaduvinal Varghese, Jeslin

2009-05-15T23:59:59.000Z

178

Open source software development and maintenance: an exploratory analysis  

E-Print Network [OSTI]

-scale development projects (Aoki et al. 2001; German 2004; Kerstetter et al. 2003; Markus et al. 2000; Scacchi 2004b; Wheeler 2003). Some have looked into issues like participation in OSS projects (Bergquist and Ljungberg 2001; Crowston and Scozzi 2002; Dempsey.... According to estimates, software maintenance consumes more than 80% of the lifecycle costs of software systems (Erlikh 2000; Moad 1990). From the point of view of organizational resources, IS departments spend 50-80% of their budgets on software...

Raja, Uzma

2009-06-02T23:59:59.000Z

179

The Engineered Approach to Energy and Maintenance Effective Steam Trapping  

E-Print Network [OSTI]

., Chemical Engineering 9/1/75. 4. Maintenance Engineering, May 1976. 5. "How Much Does Lost Steam Cost",Armstrong Machine works, Hydrocarbon Processing, p.129, Jan. 1976. 6. "Setter Steam Trapping Cuts Energy Waste", wesley Yates, Yarway Corp..., Georgia Tech Industrial Energy Extension Service, Chemical Engineering, 2/11/80. 10. ''Basic Facts & Enerqv Saving Tips" ,Lawrence R. O'Dell, Armstrong Machine Works, Heating/Piping/ Air Conditioning, May 1977. 11. Steam Trap Report - Energy Loss...

Krueger, R. G.; Wilt, G. W.

1980-01-01T23:59:59.000Z

180

Structural health and prognostics management for offshore wind turbines : case studies of rotor fault and blade damage with initial O&M cost modeling.  

SciTech Connect (OSTI)

Operations and maintenance costs for offshore wind plants are significantly higher than the current costs for land-based (onshore) wind plants. One way to reduce these costs would be to implement a structural health and prognostic management (SHPM) system as part of a condition based maintenance paradigm with smart load management and utilize a state-based cost model to assess the economics associated with use of the SHPM system. To facilitate the development of such a system a multi-scale modeling approach developed in prior work is used to identify how the underlying physics of the system are affected by the presence of damage and faults, and how these changes manifest themselves in the operational response of a full turbine. This methodology was used to investigate two case studies: (1) the effects of rotor imbalance due to pitch error (aerodynamic imbalance) and mass imbalance and (2) disbond of the shear web; both on a 5-MW offshore wind turbine in the present report. Based on simulations of damage in the turbine model, the operational measurements that demonstrated the highest sensitivity to the damage/faults were the blade tip accelerations and local pitching moments for both imbalance and shear web disbond. The initial cost model provided a great deal of insight into the estimated savings in operations and maintenance costs due to the implementation of an effective SHPM system. The integration of the health monitoring information and O&M cost versus damage/fault severity information provides the initial steps to identify processes to reduce operations and maintenance costs for an offshore wind farm while increasing turbine availability, revenue, and overall profit.

Myrent, Noah J. [Purdue Center for Systems Integrity, Lafayette, IN; Kusnick, Joshua F. [Purdue Center for Systems Integrity, Lafayette, IN; Barrett, Natalie C. [Purdue Center for Systems Integrity, Lafayette, IN; Adams, Douglas E. [Purdue Center for Systems Integrity, Lafayette, IN; Griffith, Daniel Todd

2013-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "increased maintenance costs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Dynamic Maintenance of Service Orchestrations  

E-Print Network [OSTI]

-Rocquencourt, France Valérie Issarny INRIA Paris-Rocquencourt, France ABSTRACT Service-oriented architectures evolved/orchestration of services. One of the next challenges in this field is the maintenance of service-oriented architectures orchestrations. 1. INTRODUCTION Service Oriented Architecture (SOA) is an architectural style that emerged

Boyer, Edmond

182

An examination of the costs and critical characteristics of electric utility distribution system capacity enhancement projects  

SciTech Connect (OSTI)

This report classifies and analyzes the capital and total costs (e.g., income tax, property tax, depreciation, centralized power generation, insurance premiums, and capital financing) associated with 130 electricity distribution system capacity enhancement projects undertaken during 1995-2002 or planned in the 2003-2011 time period by three electric power utilities operating in the Pacific Northwest. The Pacific Northwest National Laboratory (PNNL), in cooperation with participating utilities, has developed a large database of over 3,000 distribution system projects. The database includes brief project descriptions, capital cost estimates, the stated need for each project, and engineering data. The database was augmented by additional technical (e.g., line loss, existing substation capacities, and forecast peak demand for power in the area served by each project), cost (e.g., operations, maintenance, and centralized power generation costs), and financial (e.g., cost of capital, insurance premiums, depreciations, and tax rates) data. Though there are roughly 3,000 projects in the database, the vast majority were not included in this analysis because they either did not clearly enhance capacity or more information was needed, and not available, to adequately conduct the cost analyses. For the 130 projects identified for this analysis, capital cost frequency distributions were constructed, and expressed in terms of dollars per kVA of additional capacity. The capital cost frequency distributions identify how the projects contained within the database are distributed across a broad cost spectrum. Furthermore, the PNNL Energy Cost Analysis Model (ECAM) was used to determine the full costs (e.g., capital, operations and maintenance, property tax, income tax, depreciation, centralized power generation costs, insurance premiums and capital financing) associated with delivering electricity to customers, once again expressed in terms of costs per kVA of additional capacity. The projects were sorted into eight categories (capacitors, load transfer, new feeder, new line, new substation, new transformer, reconductoring, and substation capacity increase) and descriptive statistics (e.g., mean, total cost, number of observations, and standard deviation) were constructed for each project type. Furthermore, statistical analysis has been performed using ordinary least squares regression analysis to identify how various project variables (e.g., project location, the primary customer served by the project, the type of project, the reason for the upgrade, size of the upgrade) impact the unit cost of the project.

Balducci, Patrick J.; Schienbein, Lawrence A.; Nguyen, Tony B.; Brown, Daryl R.; Fathelrahman, Eihab M.

2004-06-01T23:59:59.000Z

183

Reviewing electricity generation cost assessments.  

E-Print Network [OSTI]

?? Studies assessing the electricity generation cost of various power generating technologies are becoming increasingly common and references to such studies can often be heard (more)

Larsson, Simon

2012-01-01T23:59:59.000Z

184

Cost Effectiveness NW Energy Coalition  

E-Print Network [OSTI]

1 Action 8 Cost Effectiveness Manual Kim Drury NW Energy Coalition Context · Inconsistent understanding of cost effectiveness contributed to under performing conservation E.g: individual measures vs at end of 2009 #12;2 The thinking was . . . That a Cost Effectiveness Guide could: · Increase regionally

185

Human Factors/Ergonomics Handbook for the Design for Ease of Maintenance  

Broader source: Energy.gov (indexed) [DOE]

7 2.0 DESIGN FOR MAINTAINABILITY This section contains human factors guidance for designing systems, subsystems, equipment and facilities so that maintenance is easy and cost effective. 2.1 Unitization, modularization, and standardization Unitization refers to separating equipment into physically and functionally distinct units to allow for easy removal and replacement. This type of equipment separation will permit division of maintenance responsibility, especially troubleshooting, among various maintenance levels. Modularization refers to unitized equipment in which the functional units making up a module are integrated and are removed or inserted as a unit. 2.1.1 Goals of unitization/modularization. Unit design/modularization of equipment should

186

Maintenance and repair expenditures: determinants and tradeoffs with new capital goods  

Science Journals Connector (OSTI)

Traditionally economic analysis has focused on new capital investment, while ignoring expenditures to maintain or repair existing stock. Recent, broader theories of replacement have emphasized the important role played by both maintenance and utilization rates. However, the decision to extend the service life of capital has been given scant empirical attention, owing partly to a lack of appropriate data. This study exploits survey data that report annual maintenance/repair expenditures for Canadian manufacturing industries. A standard production framework, modified to incorporate endogenous depreciation, guides the econometric analysis. The empirical results indicate that the cost of capital, among other variables, has a statistically significant effect on maintenance/repair decisions.

J.K. Mullen; Martin Williams

2004-01-01T23:59:59.000Z

187

Computerized Maintenance Management Systems | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Program Areas » Operations & Maintenance » Computerized Program Areas » Operations & Maintenance » Computerized Maintenance Management Systems Computerized Maintenance Management Systems October 7, 2013 - 9:35am Addthis Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and maintenance (O&M) programs. The software automates most of the logistical functions performed by O&M staff. Capabilities Typical CMMS functions depend on the complexity of the system chosen. Examples include: Work order generation, prioritization, and tracking by equipment and/or component. Work orders often can be sorted by equipment, date, person responding, etc. Tracking scheduled and unscheduled maintenance activities Storing technical documentation and maintenance procedures by

188

Invertible Program Restructurings for Continuing Modular Maintenance  

E-Print Network [OSTI]

Invertible Program Restructurings for Continuing Modular Maintenance Julien Cohen ASCOLA team (EMN in main- tenance with invertible program transformations. We illustrate this on the typical Expression problems with our approach. Keywords-modular maintenance; restructuring; invertible pro- gram

Paris-Sud XI, Université de

189

Effects of dairy intake on weight maintenance  

E-Print Network [OSTI]

, randomized trial. Weight loss was baseline to 3 months, weight maintenance was 4 to 9 months. Participants were maintained randomly assigned to low dairy ( 3 servings/d) diets for the maintenance phase. Three...

Zemel, Michael B.; Donnelly, Joseph E.; Smith, Bryan K.; Sullivan, Debra K.; Richards, Joanna; Morgan-Hanusa, Danielle; Mayo, Matthew S.; Sun, Xiaocun; Cook-Wiens, Galen; Bailey, Bruce W.; Van Walleghen, Emily L.; Washburn, Richard A.

2008-10-24T23:59:59.000Z

190

Operations & Maintenance Best Practices Guide: Chapter 9  

Broader source: Energy.gov [DOE]

Guide describes chapter 9 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

191

Operations & Maintenance Best Practices Guide: Front Matter  

Broader source: Energy.gov [DOE]

Guide describes the front matter of the Operations and Maintenance Best Practices: a Guide to Achieving Operational Efficiency.

192

Operations & Maintenance Best Practices Guide: Appendix c  

Broader source: Energy.gov [DOE]

Guide describes Appendix C of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

193

Operations & Maintenance Best Practices Guide: Chapter 7  

Broader source: Energy.gov [DOE]

Guide describes chapter 7 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

194

Operations & Maintenance Best Practices Guide: Chapter 5  

Broader source: Energy.gov [DOE]

Guide describes chapter 5 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

195

Reliability centered maintenance (RCM) products - future  

SciTech Connect (OSTI)

This paper summarizes products related to RCM of power systems which will soon be available. The titles include: substation RCM handbook and software; substation RCM driven productive maintenance; transmission RCM evaluation; transmission inspection and maintenance workstation; transmission inspection and detection methods; substation RCM implementation and software support; substation maintenance management workstation; transmission RCM handbook and software; transmission inspection and maintenance workstation - TC; distribution RCM handbook and software; transmission RCM implementation and software support; and distribution RCM implementation and software support.

Lyons, P.F.

1996-08-01T23:59:59.000Z

196

Operations & Maintenance Best Practices Guide: Chapter 8  

Broader source: Energy.gov [DOE]

Guide describes chapter 8 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

197

Collector Field Maintenance: Distributed Solar Thermal Systems  

Science Journals Connector (OSTI)

This paper reports on recent operation and maintenance experiences with distributed solar thermal systems. Although some information on system-...

E. C. Boes; E. C. Cameron; E. L. Harley

1986-01-01T23:59:59.000Z

198

Operations & Maintenance Best Practices Guide: Chapter 10  

Broader source: Energy.gov [DOE]

Guide describes chapter 10 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

199

Operations & Maintenance Best Practices Guide: Chapter 6  

Broader source: Energy.gov [DOE]

Guide describes chapter 6 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

200

Operations & Maintenance Best Practices Guide: Appendix a  

Broader source: Energy.gov [DOE]

Guide describes Appendix A of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

Note: This page contains sample records for the topic "increased maintenance costs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Laboratory services series: a programmed maintenance system  

SciTech Connect (OSTI)

The diverse facilities, operations and equipment at a major national research and development laboratory require a systematic, analytical approach to operating equipment maintenance. A computer-scheduled preventive maintenance program is described including program development, equipment identification, maintenance and inspection instructions, scheduling, personnel, and equipment history.

Tuxbury, D.C.; Srite, B.E.

1980-01-01T23:59:59.000Z

202

Categorical Exclusion for Maintenance Work  

Broader source: Energy.gov (indexed) [DOE]

Maintenance Work Maintenance Work along the Electrical District 5 to Saguaro segment (41/4 to 58/5) of the Maricopa-Saguaro 115-kV Transmission Line, between Friendly Comers and Marana, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western plans to conduct maintenance work to maintain or improve the reliability and safety of electrical transmission along 17 miles of the Test Track (formerly Maricopa)-Saguaro 115-kV Transmission Line between Electrical District 5 and Saguaro Steam Plant Substations. The work includes replacing wood poles, cross arms, and knee braces in-kind at 27 structures (41/4-8, 4214, 43/6, 4417, 45/4,46/6,47/2,49/2,49/6,50/2,50/6,50/8,51/4, 52/3, 54/3, 5517, 56/1 57/1-3, 57/8 & 58/2-3), because the wood poles failed stability tests, cross arms are beyond

203

On risk-based operation and maintenance of offshore wind turbine components  

Science Journals Connector (OSTI)

Operation and maintenance are significant contributors to the cost of energy for offshore wind turbines. Optimal planning could rationally be based on Bayesian pre-posterior decision theory, and all costs through the lifetime of the structures should be included. This paper contains a study of a generic case where the costs are evaluated for a single wind turbine with a single component. Costs due to inspections, repairs, and lost production are included in the model. The costs are compared for two distinct maintenance strategies, namely with and without inclusion of periodic imperfect inspections. Finally the influence of different important parameters, e.g. failure rate, reliability of inspections, inspection interval, and decision rule for repairs, is evaluated.

Jannie Jessen Nielsen; John Dalsgaard Srensen

2011-01-01T23:59:59.000Z

204

INTOR critical issue D: maintainability. Tritium containment and personnel access vs remote maintenance, Chapter VI of the US INTOR report for Phase Two A, Part 2  

SciTech Connect (OSTI)

The purpose of this study is to compare the benefits and costs associated with personnel access mmaintenance procedures compared to those of all-remote maintenance procedures. The INTOR Phase Two A, Part I configuration was used to make this comparison. For both approaches, capital and operating costs were considered to first order, maintenance equipment requirements were investigated, maintenance requirements common to both approaches and unique to each were identified, tritium handling requirements were outlined, and maintenance scenarios and device downtime were developed for both. In addition, estimates of person-rem exposure were made for the personnel access approach.

Spampinato, P.T.; Finn, P.A.; Gohar, Y.; Yang, S.T.; Stasko, R.R.; Morrison, C.; Russell, S.; Shaw, G.; Bussell, G.T.; Watts, R.

1984-01-01T23:59:59.000Z

205

Filter system cost comparison for IGCC and PFBC power systems  

SciTech Connect (OSTI)

A cost comparison was conducted between the filter systems for two advanced coal-based power plants. The results from this study are presented. The filter system is based on a Westinghouse advanced particulate filter concept, which is designed to operate with ceramic candle filters. The Foster Wheeler second-generation 453 MWe (net) pressurized fluidized-bed combustor (PFBC) and the KRW 458 MWe (net) integrated gasification combined cycle (IGCC) power plants are used for the comparison. The comparison presents the general differences of the two power plants and the process-related filtration conditions for PFBC and IGCC systems. The results present the conceptual designs for the PFBC and IGCC filter systems as well as a cost summary comparison. The cost summary comparison includes the total plant cost, the fixed operating and maintenance cost, the variable operating and maintenance cost, and the effect on the cost of electricity (COE) for the two filter systems.

Dennis, R.A.; McDaniel, H.M.; Buchanan, T. [and others

1995-12-01T23:59:59.000Z

206

NREL: Energy Analysis - Energy Technology Cost and Performance Data for  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Bookmark and Share Bookmark and Share Energy Technology Cost and Performance Data for Distributed Generation Transparent Cost Database Button Recent cost estimates for distributed generation (DG) renewable energy technologies are available across capital costs, operations and maintenance (O&M) costs, and levelized cost of energy (LCOE). Use the tabs below to navigate the charts. The LCOE tab provides a simple calculator for both utility-scale and DG technologies that compares the combination of capital costs, O&M, performance, and fuel costs. If you are seeking utility-scale technology cost and performance estimates, please visit the Transparent Cost Database website for NREL's information regarding vehicles, biofuels, and electricity generation. Capital Cost (September 2013 Update)

207

Remote maintenance for a new generation of hot cells  

SciTech Connect (OSTI)

For several years the Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) has been developing facility concepts, designing specialized equipment, and testing prototypical hardware for reprocessing spent fuel from fast breeder reactors. The major facility conceptual design, the Hot Experimental Facility, was based on total remote maintenance to increase plant availability and to reduce radiation exposure. This thrust included designing modular equipment to facilitate maintenance and the manipulation necessary to accomplish maintenance. Included in the design repetoire was the development effort in advanced servomanipulator systems, a remote sampling system, television viewing, and a transporter for manipulator positioning. Demonstration of these developed items is currently ongoing, and the technology is available for applications where production operations in highly radioactive environments are required.

Feldman, M.J.; Grant, N.R.

1987-01-01T23:59:59.000Z

208

Pacific Northwest Laboratory Maintenance Implementation plan  

SciTech Connect (OSTI)

This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

Bright, J.D.

1992-06-01T23:59:59.000Z

209

Pacific Northwest Laboratory Maintenance Implementation plan  

SciTech Connect (OSTI)

This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory`s (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number_sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services` current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

Bright, J.D.

1992-06-01T23:59:59.000Z

210

Electricity costs  

Science Journals Connector (OSTI)

... index is used to correct for inflation. The short answer is given by the Central Electricity Generating Board's (CEGB's) 1980-81 report, paragraph 168. "The ... Generating Board's (CEGB's) 1980-81 report, paragraph 168. "The cost per kWh of fuel. . . rose by 18.6 per cent (between 1979 ...

J.W. JEFFERY

1982-03-18T23:59:59.000Z

211

Economic and sensitivity analyses of dynamic distributed generation dispatch to reduce building energy cost  

Science Journals Connector (OSTI)

Abstract The practicality of any particular distributed generation (DG) installation depends upon its ability to reduce overall energy costs. A parametric study summarizing DG performance capabilities is developed using an economic dispatch strategy that minimizes building energy costs. Various electric rate structures are considered and applied to simulate meeting various measured building demand dynamics for heat and power. A determination of whether investment in DG makes economic sense is developed using a real-time dynamic dispatch and control strategy to meet real building demand dynamics. Under the economic dispatch strategy, capacity factor is influenced by DG electrical efficiency, operations and maintenance cost, and fuel price. Under a declining block natural gas rate structure, a large local thermal demand improves DG economics. Increasing capacity for DG that produces low cost electricity increases savings, but installing further capacity beyond the average building electrical demand reduces savings. For DG that produces high cost electricity, reducing demand charges can produce savings. Heat recovery improves capacity factor and DG economics only if thermal and electrical demand is coincident and DG heat is utilized. Potential DG economic value can be improved or impaired depending upon how the utility electricity cost is determined.

Robert J. Flores; Brendan P. Shaffer; Jacob Brouwer

2014-01-01T23:59:59.000Z

212

Increasing Knowledge Increasing Knowledge 29  

E-Print Network [OSTI]

28 Increasing Knowledge Increasing Knowledge 29 Expanding Leadership 36 Building Partnerships 43 the world. The challenges ahead are large, but WSP is preparing to meet them by increasing knowledge, expanding leadership, building partnerships, and seeking solutions. #12;29 Increasing Knowledge Increasing

Fay, Noah

213

Types of Costs Types of Cost Estimates  

E-Print Network [OSTI]

first cost or capital investment): ­ Expenditures made to acquire or develop capital assets ­ Three main· Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408: Mining-site management or corporate level expenditure · Direct vs. Indirect Costs ­ Direct (or variable) costs apply

Boisvert, Jeff

214

Types of Costs Types of Cost Estimates  

E-Print Network [OSTI]

-Revenue Relationships · Capital Costs (or first cost or capital investment): ­ Expenditures made to acquire or develop05-1 · Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408 ­ off-site management or corporate level expenditure · Direct vs. Indirect Costs ­ Direct (or variable

Boisvert, Jeff

215

No maintenance -- no energy efficiency  

SciTech Connect (OSTI)

Field investigations illustrate that it is not realistic to expect new high-tech equipment to function for a full life expectancy at high efficiency without significant operations and maintenance (O&M). A simple walk through inspection of most buildings reveals extensive equipment that is being operated on manual override, is incorrectly adjusted and operating inefficiently, or is simply inoperative. This point is illustrated with two examples at Robins Air Force Base, Georgia. The first describes development of a comprehensive, base-wide, steam trap maintenance program. The second describes a measured evaluation from a typical office building. The objective of both examples was to assess the importance of proper O&M. The proposed ``O&M First`` philosophy will result in more efficient building HVAC operation, provide improved services to the building occupants, and reduce energy consumption and unscheduled equipment repair/replacement. Implementation of a comprehensive O&M program will result in a 15--25% energy savings. The O&M foundation that is established will allow other energy conservation activities such is demand side management or energy management and control systems, to achieve and maintain their expected energy savings.

Szydlowski, R.F.; Schliesing, J.S.; Winiarski, D.W.

1994-12-01T23:59:59.000Z

216

Estimate Costs to Implement Greenhouse Gas Mitigation Strategies Using  

Broader source: Energy.gov (indexed) [DOE]

Costs to Implement Greenhouse Gas Mitigation Strategies Costs to Implement Greenhouse Gas Mitigation Strategies Using Renewable Energy in Buildings Estimate Costs to Implement Greenhouse Gas Mitigation Strategies Using Renewable Energy in Buildings October 7, 2013 - 11:25am Addthis After determining the best greenhouse gas (GHG) reduction strategies using renewable energy, a Federal agency should estimate the cost of implementing them in a building or buildings. There are several cost factors that need to be considered when developing a renewable energy project. Capital costs, fixed and variable operations and maintenance (O&M) costs and in the case of biomass and waste-to-energy projects, fuel costs all contribute to the total cost of operating a renewable energy system. The levelized system cost takes into account these

217

Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3  

SciTech Connect (OSTI)

The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

Leigh, Richard J.

2012-09-01T23:59:59.000Z

218

Dynamic grouping maintenance strategy with time limited opportunities Phuc Do Van, Florent Brissaud, Anne Barros, Christophe Berenguer  

E-Print Network [OSTI]

. For example, engine oil has to change more frequently than driving belt on a heavy vehicle (Bouvard, Artus activities could be executed with reduced maintenance costs, the present paper proposes a new algorithm states depend on other components states) and/or economically dependent (the cost of mainte- nance

Paris-Sud XI, Université de

219

Operations and Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Operations and Maintenance Operations and Maintenance Operations and Maintenance October 16, 2013 - 5:01pm Addthis Project Construction Commissioning Operations & Maintenance Operations and maintenance (O&M) programs are critical to successfully integrating renewable energy into new Federal building construction and major renovations. This overview covers the importance of O&M programs for renewable energy projects, creating a successful O&M program, and identifying the right team to carry out the program. It highlights typical renewable energy issues and recommends following the design, specifications, and recommendations from product manufacturers. Key Actions in Operations and Maintenance Make O&M a priority to protect agency investment. Include O&M input in design reviews.

220

Predictive Maintenance Technologies | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Maintenance Technologies Maintenance Technologies Predictive Maintenance Technologies October 28, 2013 - 10:15am Addthis Several diagnostic technologies and best practices are available to assist Federal agencies with predictive maintenance programs. Chapter 6 of the FEMP O&M Best Practices Guide (PDF 721 KB) outlines these technologies in detail. The full guide is also available (PDF 3.3 MB). Predictive maintenance technologies include: Thermography: Infrared imaging is used to generate visual images that identify variations in the infrared radiance of object surfaces. This method can be used to detect system surface wear, leaks, or failures. Lubricant and Wear Particle Analysis (a.k.a. Oil Analysis): Detailed analysis is taken to determine needed maintenance based on lubrication

Note: This page contains sample records for the topic "increased maintenance costs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

FACILITY MAINTENANCE MANAGEMENT QUALIFICATION STANDARD REFERENCE GUIDE  

Broader source: Energy.gov (indexed) [DOE]

Facility Facility Maintenance Management Qualification Standard Reference Guide NOVEMBER 2009 Table of Contents i FIGURES...................................................................................................................................... iv TABLES........................................................................................................................................ iv ACRONYMS ................................................................................................................................. v PURPOSE...................................................................................................................................... 1 SCOPE ...........................................................................................................................................

222

FAQS Reference Guide Facility Maintenance Management  

Broader source: Energy.gov [DOE]

This reference guide addresses the competency statements in the April 2014 edition of DOE Standard DOE-STD-1181-2014, Facility Maintenance Management Functional Area Qualification Standard.

223

Methods for Identifying Best-Value Bid for Performance-based Maintenance Contracts  

E-Print Network [OSTI]

Performance-based contracting (PBC) for roadway maintenance is relatively new among various alternative contracting options available at present and is increasingly drawing more attention from state Departments of Transportation (DOTs...

Ahmed, Jubair

2011-02-22T23:59:59.000Z

224

Desired outcomes, unexpected processes : two stories of sanitation maintenance in Erode tenements, India  

E-Print Network [OSTI]

A central challenge facing municipalities in developing countries is the successful maintenance of sanitation services for their urban poor. Not only are municipalities struggling to cope with increased sanitation coverage ...

Balakrishnan, Sai

2008-01-01T23:59:59.000Z

225

Estimating Specialty Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Specialty costs are those nonstandard, unusual costs that are not typically estimated. Costs for research and development (R&D) projects involving new technologies, costs associated with future regulations, and specialty equipment costs are examples of specialty costs. This chapter discusses those factors that are significant contributors to project specialty costs and methods of estimating costs for specialty projects.

1997-03-28T23:59:59.000Z

226

Direct costing  

E-Print Network [OSTI]

oau 5e reduced. Under the same oonOitions, even ~Me on a bread scale entails not mere1y the conduct of the direct oyeraticns cf yrccessing the materials into finished products, but also the performance of auxiliary functions. these may 'ba power y... purposes have been advanced as folkway le Most of a o03RyaxO' 8 products Grc usual13r sold at prices which oovex' full product costs y plus 861ling a%el administrative expenses, plus normal profit. The inventoi~ valuate. on should be consistent...

Browning, Donald Bullock

2012-06-07T23:59:59.000Z

227

Industrial heat pumps: types and costs  

SciTech Connect (OSTI)

Many potentially beneficial applications for industrial heat pumps are not being pursued because of confusion regarding both energy savings and economics. Part of this confusion stems from the variety of heat pumps available and the fact that the measure of merit, the coefficient of performance (COP), is commonly defined in at least three different ways. In an attempt to circumvent this problem, a simple categorization was developed based on the commonly accepted COP definitions. Using this categorization, the cost of recovering waste energy with heat pumps was examined. Examples were evaluated in which the cost of energy delivered was calculated based on estimates of capital cost, operating costs, and maintenance costs. Heat pumps from the various categories were then compared on the basis of economics.

Chappell, R.N.; Bliem, C.J. Jr.; Mills, J.I.; Demuth, O.J.; Plaster, D.S.

1985-03-01T23:59:59.000Z

228

Industrial heat pumps - types and costs  

SciTech Connect (OSTI)

Many potentially beneficial applications for industrial heat pumps are not being pursued because of confusion regarding both energy savings and economics. Part of this confusion stems from the variety of heat pumps available and the fact that the measure of merit, the coefficient of performance (COP) is commonly defined in at least three different ways. In an attempt to circumvent this problem, a simple categorization was developed based on the commonly accepted COP definitions. Using this categorization, the cost of recovering waste energy with heat pumps was examined. Examples were evaluated in which the cost of energy delivered was calculated based on estimates of capital cost, operating costs, and maintenance costs. Heat pumps from the various categories were then compared on the basis of economics. 6 refs., 7 figs.

Chappell, R.N.; Bliem, C.J. Jr.; Mills, J.I.; Demuth, O.J.; Plaster, D.S.

1985-01-01T23:59:59.000Z

229

CBM processes are applicable to maintenance activities on complex systems. Southwest Research Institute  

E-Print Network [OSTI]

components or subsystems. · Prognostic algorithms estimate remaining useful life based on past and future systems · Jet engines · Wind turbine generators · Marine diesel engines · Natural gas compression performance costs, and preventive/ scheduled maintenance replaces parts before the end of their useful life

Chapman, Clark R.

230

Risk Based Maintenance Optimization using Probabilistic Maintenance Quantification Models of Circuit Breaker  

E-Print Network [OSTI]

and maintenance techniques of the component. The model is based on the concept of representing the component life time by several deterioration stages. Inspection and maintenance is introduced at each stage and model parameters are defined. A sensitivity analysis...

Natti, Satish

2010-01-14T23:59:59.000Z

231

Cost Analysis Rate Settin  

E-Print Network [OSTI]

Cost Analysis and Rate Settin for Animal Research Facilities #12;#12;Cost Analysis and Rate ... .. . ...................... . . . ................................. . .... 7 Chapter 2 Preparation for Cost Analysis ......................................................... 9 Chapter 3 Assignment of Costs to Animal Research Facility Cost Centers

Baker, Chris I.

232

Realistic costs of carbon capture  

SciTech Connect (OSTI)

There is a growing interest in carbon capture and storage (CCS) as a means of reducing carbon dioxide (CO2) emissions. However there are substantial uncertainties about the costs of CCS. Costs for pre-combustion capture with compression (i.e. excluding costs of transport and storage and any revenue from EOR associated with storage) are examined in this discussion paper for First-of-a-Kind (FOAK) plant and for more mature technologies, or Nth-of-a-Kind plant (NOAK). For FOAK plant using solid fuels the levelised cost of electricity on a 2008 basis is approximately 10 cents/kWh higher with capture than for conventional plants (with a range of 8-12 cents/kWh). Costs of abatement are found typically to be approximately US$150/tCO2 avoided (with a range of US$120-180/tCO2 avoided). For NOAK plants the additional cost of electricity with capture is approximately 2-5 cents/kWh, with costs of the range of US$35-70/tCO2 avoided. Costs of abatement with carbon capture for other fuels and technologies are also estimated for NOAK plants. The costs of abatement are calculated with reference to conventional SCPC plant for both emissions and costs of electricity. Estimates for both FOAK and NOAK are mainly based on cost data from 2008, which was at the end of a period of sustained escalation in the costs of power generation plant and other large capital projects. There are now indications of costs falling from these levels. This may reduce the costs of abatement and costs presented here may be 'peak of the market' estimates. If general cost levels return, for example, to those prevailing in 2005 to 2006 (by which time significant cost escalation had already occurred from previous levels), then costs of capture and compression for FOAK plants are expected to be US$110/tCO2 avoided (with a range of US$90-135/tCO2 avoided). For NOAK plants costs are expected to be US$25-50/tCO2. Based on these considerations a likely representative range of costs of abatement from CCS excluding transport and storage costs appears to be US$100-150/tCO2 for first-of-a-kind plants and perhaps US$30-50/tCO2 for nth-of-a-kind plants.The estimates for FOAK and NOAK costs appear to be broadly consistent in the light of estimates of the potential for cost reductions with increased experience. Cost reductions are expected from increasing scale, learning on individual components, and technological innovation including improved plant integration. Innovation and integration can both lower costs and increase net output with a given cost base. These factors are expected to reduce abatement costs by approximately 65% by 2030. The range of estimated costs for NOAK plants is within the range of plausible future carbon prices, implying that mature technology would be competitive with conventional fossil fuel plants at prevailing carbon prices.

Al Juaied, Mohammed (Harvard Univ., Cambridge, MA (US). Belfer Center for Science and International Affiaris); Whitmore, Adam (Hydrogen Energy International Ltd., Weybridge (GB))

2009-07-01T23:59:59.000Z

233

Cost Sharing What is Cost Sharing?  

E-Print Network [OSTI]

1 Cost Sharing What is Cost Sharing? x Cost sharing is a commitment to use university resources and Expenses o Equipment x Committing to cost share is highly discouraged unless required by the sponsoring agency x Tracking of committed cost share is required to meet federal regulations (OMB A-110) x UCSD has

Tsien, Roger Y.

234

Building 9401-2 Plating Shop Surveillance and Maintenance Plan  

SciTech Connect (OSTI)

This document provides a plan for implementing surveillance and maintenance (S and M) activities to ensure that Building 9401-2 Plating Shop is maintained in a cost effective and environmentally secure configuration until subsequent closure during the final disposition phase of decommissioning. U.S. Department of Energy (DOE) G430.1A-2, Surveillance and Maintenance During Facility Disposition (1997), was used as guidance in the development of this plan. The S and M Plan incorporates DOE O 430.1A, Life Cycle Asset Management (LCAM) (1998a) direction to provide for conducting surveillance and maintenance activities required to maintain the facility and remaining hazardous and radioactive materials, wastes, and contamination in a stable and known condition pending facility disposition. Recommendations in the S and M plan have been made that may not be requirement-based but would reduce the cost and frequency of surveillance and maintenance activities. During the course of S and M activities, the facility's condition may change so as to present an immediate or developing hazard or unsatisfactory condition. Corrective action should be coordinated with the appropriate support organizations using the requirements and guidance stated in procedure Y10-202, Rev. 1, Integrated Safety Management Program, (Lockheed Martin Energy Systems, Inc. (LMES), 1998a) implemented at the Oak Ridge Y-12 Plant and the methodology of the Nuclear Operations Conduct of Operations Manual (LMES, 1999) for the Depleted Uranium Operations (DUO) organization. The key S and M objectives applicable to the Plating Shop are to: Ensure adequate containment of remaining residual material in exhaust stacks and outside process piping, stored chemicals awaiting offsite shipment, and items located in the Radioactive Material Area (RMA); Provide access control into the facility and physical safety to S and M personnel; Maintain the facility in a manner that will protect the public, the environment, and the S and M personnel; Provide an S and M plan which identifies and complies with applicable environmental, safety, and health safeguards and security requirements; and Provide a cost effective S and M program for the plating shop, Building 9401-2.

None

1999-05-01T23:59:59.000Z

235

EVALUATION OF SPRING OPERATED RELIEF VALVE MAINTENANCE INTERVALS AND EXTENSION OF MAINTENANCE TIMES USING A WEIBULL ANALYSIS WITH MODIFIED BAYESIAN UPDATING  

SciTech Connect (OSTI)

The Savannah River Site (SRS) spring operated pressure relief valve (SORV) maintenance intervals were evaluated using an approach provided by the American Petroleum Institute (API RP 581) for risk-based inspection technology (RBI). In addition, the impact of extending the inspection schedule was evaluated using Monte Carlo Simulation (MCS). The API RP 581 approach is characterized as a Weibull analysis with modified Bayesian updating provided by SRS SORV proof testing experience. Initial Weibull parameter estimates were updated as per SRS's historical proof test records contained in the Center for Chemical Process Safety (CCPS) Process Equipment Reliability Database (PERD). The API RP 581 methodology was used to estimate the SORV's probability of failing on demand (PFD), and the annual expected risk. The API RP 581 methodology indicates that the current SRS maintenance plan is conservative. Cost savings may be attained in certain mild service applications that present low PFD and overall risk. Current practices are reviewed and recommendations are made for extending inspection intervals. The paper gives an illustration of the inspection costs versus the associated risks by using API RP 581 Risk Based Inspection (RBI) Technology. A cost effective maintenance frequency balancing both financial risk and inspection cost is demonstrated.

Harris, S.; Gross, R.; Mitchell, E.

2011-01-18T23:59:59.000Z

236

Software Testing and Maintenance 1 Regression Testing  

E-Print Network [OSTI]

1 Software Testing and Maintenance 1 Regression Testing Introduction Test Selection Test Minimization Test Prioritization Summary Software Testing and Maintenance 2 What is it? Regression testing refers to the portion of the test cycle in which a program is tested to ensure that changes do not affect

Lei, Jeff Yu

237

Gas turbine performance prognostic for condition-based maintenance  

Science Journals Connector (OSTI)

Gas turbine engines experience degradations over time that cause great concern to gas turbine users on engine reliability, availability and operating costs. Gas turbine diagnostics and prognostics is one of the key technologies to enable the move from time-scheduled maintenance to condition-based maintenance in order to improve engine reliability and availability and reduce life cycle costs. This paper describes a prognostic approach to estimate the remaining useful life of gas turbine engines before their next major overhaul based on historical health information. A combined regression techniques, including both linear and quadratic models, is proposed to predict the remaining useful life of gas turbine engines. A statistic compatibility check is used to determine the transition point from a linear regression to a quadratic regression. The developed prognostic approach has been applied to a model gas turbine engine similar to Rolls-Royce industrial gas turbine AVON 1535 implemented with compressor degradation over time. The analysis shows that the developed prognostic approach has a great potential to provide an estimation of engine remaining useful life before next major overhaul for gas turbine engines experiencing a typical soft degradation.

Y.G. Li; P. Nilkitsaranont

2009-01-01T23:59:59.000Z

238

Operations and Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Program Areas » Operations and Maintenance Program Areas » Operations and Maintenance Operations and Maintenance October 4, 2013 - 5:07pm Addthis Federal facilities rely on pumps, motors, fans, and other mechanical systems for everyday operations. These systems must be maintained and operated correctly to reach their full potential. Well-executed operations and maintenance (O&M) programs promote energy efficiency and life cycle performance and can save Federal agencies 5% to 20% on annual energy bills without significant capital investments. Learn about: Federal Requirements: Look up O&M-related requirements that Federal agencies must meet as outlined by law and executive order Management Process: Learn about the operations and maintenance management process Commissioning: Get an overview of commissioning processes

239

Economics of Online Structural Health Monitoring of Wind Turbines: Cost Benefit Analysis  

E-Print Network [OSTI]

Economics of Online Structural Health Monitoring of Wind Turbines: Cost Benefit Analysis Jeremy Van monitoring (OSHM) and condition-based maintenance (CBM) of wind turbine blades has the potential to reduce O cost of energy (LCOE) [1]. The costs required to keep wind turbines working in extreme temperatures

McCalley, James D.

240

Metabolic systems cost-benefit analysis for interpreting network structure and regulation  

Science Journals Connector (OSTI)

......metabolic pathways The trade-off between capital investment costs and operating costs...and do not include maintenance energy expenditures. The in silico representation of the...operating costs were defined as the expenditure of substrate, either glucose or oxygen......

Ross P. Carlson

2007-05-15T23:59:59.000Z

Note: This page contains sample records for the topic "increased maintenance costs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Federal Energy Management Program: Operations and Maintenance Contacts  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Contacts to someone by E-mail Contacts to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Contacts on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Contacts on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Contacts on Google Bookmark Federal Energy Management Program: Operations and Maintenance Contacts on Delicious Rank Federal Energy Management Program: Operations and Maintenance Contacts on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Contacts on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types

242

Federal Energy Management Program: Reliability-Centered Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Reliability-Centered Maintenance to someone by E-mail Share Federal Energy Management Program: Reliability-Centered Maintenance on Facebook Tweet about Federal Energy Management Program: Reliability-Centered Maintenance on Twitter Bookmark Federal Energy Management Program: Reliability-Centered Maintenance on Google Bookmark Federal Energy Management Program: Reliability-Centered Maintenance on Delicious Rank Federal Energy Management Program: Reliability-Centered Maintenance on Digg Find More places to share Federal Energy Management Program: Reliability-Centered Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems

243

Cost Sharing Basics Definitions  

E-Print Network [OSTI]

Cost Sharing Basics Definitions Some funding agencies require the grantee institution the project costs. Cost sharing is defined as project costs not borne by the sponsor. Cost sharing funds may resources or facilities. If the award is federal, only acceptable non-federal costs qualify as cost sharing

Finley Jr., Russell L.

244

FULL-COST ACCOUNTING  

Science Journals Connector (OSTI)

FULL-COST ACCOUNTING ... Environmental costs would be built into a product's cost, and consumers would be able to make informed purchases. ...

1993-01-11T23:59:59.000Z

245

Energy Department Report Calculates Emissions and Costs of Power...  

Broader source: Energy.gov (indexed) [DOE]

and Costs of Power Plant Cycling Necessary for Increased Wind and Solar in the West Energy Department Report Calculates Emissions and Costs of Power Plant Cycling Necessary for...

246

Grazing Strategies for Beef Production Escalating energy costs and alternative cropping systems for biofuels production have  

E-Print Network [OSTI]

for biofuels production have dramatically increased costs of fertilizer, seed, and feed grains. These increased

247

A FMEA-Aided Equipment Life-Cycle-Cost Measurement System  

Science Journals Connector (OSTI)

This research tries to establish an optimum life cycle cost (LCC) based strategy model of equipments purchasing and maintenance. The study integrates the technique of failure modes and effect analysis (FMEA) and...

Chee-cheng Chen; Hong Zhang

2013-01-01T23:59:59.000Z

248

Advanced Maintenance Services for Promoting Sustainability  

Science Journals Connector (OSTI)

Abstract Ecology and industry, which have been many times considered as antagonists, are now associated together in the sustainability concept to support the three social / economic / environment pillars. In that way, industrial enterprises and more precisely manufacturing ones seek to integrate environment into their strategy by conducting an innovative rationalization of the production as promoted by industrial ecology and circular economy paradigms. This rationalization is favoring the evolution from product to a Product-Service Systems approach (PSS). The continuity of these services is mainly carried out by the maintenance which is no longer an aftermarket service needed for product (system) functionality but rather an inherent service function of the product (system). Thus this paper aims to investigate the role of maintenance to contribute to the development of these paradigms. It is based first on describing the main features of industrial ecology/circular economy transposing the nature concepts to industrial system. It leads to define key principles and levers to be addressed for the development of industrial ecosystems. Then maintenance activity is globally presented allowing, in a second step, to place maintenance services already existing in line with some of these principles and levers (ex. green maintenance), but also to explore advanced maintenance services more able to support promotion of industrial ecosystem by covering others principles and levers. These advanced services can be built from conventional maintenance processes but integrating sustainability goal (ex. prognostics of energy efficiency) or from innovative processes (ex. regenerative management). Finally scientific issues related to these advanced maintenance services are underlining and should concretize future research directions for researchers/practitioners working on maintenance field.

Benoit Iung; Eric Levrat

2014-01-01T23:59:59.000Z

249

Limited Commercial Maintenance (LCLM) Limited Lawn & Ornamental (LLO)  

E-Print Network [OSTI]

, Limited Commercial Landscape Maintenance, Ornamental & Turf, Private Ag, or General Standards CORE for Limited Commercial Landscape Maintenance (LCLM), you must attend all day to earn the 6 CEUs required. Limited Commercial Maintenance (LCLM) Limited Lawn & Ornamental (LLO) Training & Exams Date

Florida, University of

250

Vehicle Investment and Operating Costs and Savings for Greenhouse Gas  

Broader source: Energy.gov (indexed) [DOE]

Vehicle Investment and Operating Costs and Savings for Greenhouse Vehicle Investment and Operating Costs and Savings for Greenhouse Gas Mitigation Strategies Vehicle Investment and Operating Costs and Savings for Greenhouse Gas Mitigation Strategies October 7, 2013 - 1:17pm Addthis YOU ARE HERE: Step 4 To help estimate costs of implementing greenhouse gas (GHG) mitigation strategies for vehicles, the table below provides the initial investment, operating costs, and operating savings for each strategy. Table 1. Types and Ranges of Initial Investment Requirements and Annual Operating Costs and Savings. Strategies Initial Investment Operating Costs Operating Savings Consolidate trips Time to research & coordinate routes None Eliminate fleet vehicle trips; reduce cost & time (fuel, maintenance, etc) associated with fleet vehicle use. Could result in decreasing inventory & need for vehicles leading to long-term savings

251

NREL: Energy Analysis - Levelized Cost of Energy Calculator  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Levelized Cost of Energy Calculator Levelized Cost of Energy Calculator Transparent Cost Database Button The levelized cost of energy (LCOE) calculator provides a simple calculator for both utility-scale and distributed generation (DG) renewable energy technologies that compares the combination of capital costs, operations and maintenance (O&M), performance, and fuel costs. Note that this does not include financing issues, discount issues, future replacement, or degradation costs. Each of these would need to be included for a thorough analysis. To estimate simple cost of energy, use the slider controls or enter values directly to adjust the values. The calculator will return the LCOE expressed in cents per kilowatt-hour (kWh). The U.S. Department of Energy (DOE) Federal Energy Management Program

252

Long Length Contaminated Equipment Maintenance Plan  

SciTech Connect (OSTI)

The purpose of this document is to provide the maintenance requirements of the Long Length Contaminated Equipment (LLCE) trailers and provide a basis for the maintenance frequencies selected. This document is applicable to the LLCE Receiver trailer and Transport trailer assembled by Mobilized Systems Inc. (MSI). Equipment used in conjunction with, or in support of, these trailers is not included. This document does not provide the maintenance requirements for checkout and startup of the equipment following the extended lay-up status which began in the mid 1990s. These requirements will be specified in other documentation.

ESVELT, C.A.

2000-02-01T23:59:59.000Z

253

Africa's Transport Infrastructure Mainstreaming Maintenance and  

Open Energy Info (EERE)

Africa's Transport Infrastructure Mainstreaming Maintenance and Africa's Transport Infrastructure Mainstreaming Maintenance and Management Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Africa's Transport Infrastructure Mainstreaming Maintenance and Management Agency/Company /Organization: World Bank Complexity/Ease of Use: Not Available Website: www.infrastructureafrica.org/system/files/Africa%27s%20Transport%20Inf Transport Toolkit Region(s): Africa & Middle East Related Tools The BEST Experiences with Bioethanol Buses The Sourcebook on Sustainable Urban Transport Alternative Fuels and Advanced Vehicles Data Center ... further results Find Another Tool FIND TRANSPORTATION TOOLS Transport infrastructure is a key requirement for economic growth. In Africa today, networks are sparse, conditions poor, transit slow and

254

Cost-Effectiveness Ratio  

Science Journals Connector (OSTI)

The cost?effectiveness ratio (CER) is acalculation that summarizes the intervention's net cost and effectiveness. The three types of CER are: the average cost?effectiveness ratio (ACER), the marginal cost?...

2008-01-01T23:59:59.000Z

255

Cost Share-Cost Reimbursement Invoice Format Example | The Ames...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Share-Cost Reimbursement Invoice Format Example Effective Date: 102014 File (public): Cost Share-Cost...

256

Maintenance optimisation for wind turbines.  

E-Print Network [OSTI]

??Wind is becoming an increasingly important source of energy for countries that ratify to reduce the emission of greenhouse gases and mitigate the effects of (more)

Andrawus, Jesse A.

2008-01-01T23:59:59.000Z

257

Cost-effectiveness of recommended nurse staffing levels for short-stay skilled nursing facility patients  

E-Print Network [OSTI]

Anonymous: Employer Costs for Employee Compensation--BioMed Central Open Access Cost-effectiveness of recommendeddiagnoses. However, the cost-effectiveness of increasing

Ganz, David A; Simmons, Sandra F; Schnelle, John F

2005-01-01T23:59:59.000Z

258

Federal Energy Management Program: Operations and Maintenance Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Operations and Operations and Maintenance Program Structure to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Structure on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Program Structure on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Program Structure on Google Bookmark Federal Energy Management Program: Operations and Maintenance Program Structure on Delicious Rank Federal Energy Management Program: Operations and Maintenance Program Structure on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Program Structure on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements

259

Federal Energy Management Program: Operations and Maintenance Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Operations and Operations and Maintenance Program Implementation to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Implementation on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Program Implementation on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Program Implementation on Google Bookmark Federal Energy Management Program: Operations and Maintenance Program Implementation on Delicious Rank Federal Energy Management Program: Operations and Maintenance Program Implementation on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Program Implementation on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance

260

Federal Energy Management Program: Resources on Operations and Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Resources on Resources on Operations and Maintenance to someone by E-mail Share Federal Energy Management Program: Resources on Operations and Maintenance on Facebook Tweet about Federal Energy Management Program: Resources on Operations and Maintenance on Twitter Bookmark Federal Energy Management Program: Resources on Operations and Maintenance on Google Bookmark Federal Energy Management Program: Resources on Operations and Maintenance on Delicious Rank Federal Energy Management Program: Resources on Operations and Maintenance on Digg Find More places to share Federal Energy Management Program: Resources on Operations and Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning

Note: This page contains sample records for the topic "increased maintenance costs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope...  

Broader source: Energy.gov (indexed) [DOE]

Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor February 2007 A section of...

262

CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope...  

Broader source: Energy.gov (indexed) [DOE]

Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR...

263

FY 2014 Real Property Data Related to Operations and Maintenance...  

Office of Environmental Management (EM)

FY 2014 Real Property Data Related to Operations and Maintenance Guidance FY 2014 Real Property Data Related to Operations and Maintenance Guidance FY2014DataRelatedtoOperatio...

264

DOE Announces Webinars on Maintenance Practices for LED Streetlights...  

Broader source: Energy.gov (indexed) [DOE]

Maintenance Practices for LED Streetlights, LED Color Stability, and More DOE Announces Webinars on Maintenance Practices for LED Streetlights, LED Color Stability, and More April...

265

Joint Maintenance Status Report of Potomac Electric Power Company...  

Broader source: Energy.gov (indexed) [DOE]

Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Joint Maintenance Status Report of Potomac Electric Power Company amd PJM...

266

Operations and Maintenance for Major Equipment Types | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Types Operations and Maintenance for Major Equipment Types Equipment lies at the heart of all operations and maintenance (O&M) activities. This equipment varies greatly...

267

ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS...  

Broader source: Energy.gov (indexed) [DOE]

1: SPACE AND MAINTENANCE RECORDS ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS This schedule provides for the disposal of all copies, wherever located in the...

268

Modelling in industrial maintenance and reliability  

Science Journals Connector (OSTI)

......of modelling the reliability of wind turbines and some critical subsystems from...change, through the years, in wind turbines reliability. There were major...research on determining optimal maintenance policies for deteriorating systems......

Wenbin Wang

2010-10-01T23:59:59.000Z

269

Operations and Maintenance Best Practices Guide  

Broader source: Energy.gov [DOE]

The Federal Energy Management Program's Operations and Maintenance (O&M) Best Practices Guide outlines best practices to help Federal agencies implement effective O&M for systems and...

270

Operations and Maintenance for Major Equipment Types  

Broader source: Energy.gov [DOE]

Equipment lies at the heart of all operations and maintenance (O&M) activities. This equipment varies greatly across the Federal sector in age, size, type, model, condition, etc.

271

SITE MAINTENANCE PLAN CSMRI SITE REMEDIATION  

E-Print Network [OSTI]

...............................................................................................................5 5.2 Ground and Surface Water MonitoringSITE MAINTENANCE PLAN CSMRI SITE REMEDIATION June 29, 2004 Prepared by: Colorado School of Mines .................................................................................................4 5.0 SITE AIR AND WATER MONITORING

272

Operation & Maintenance for Quality Indoor Air  

E-Print Network [OSTI]

The results of numerous Indoor Air Quality (IAQ) building investigations conducted by the Georgia Tech Research Institute have shown that building Operation and Maintenance (O&M) is a very common source of IAQ problems. This paper presents...

Downing, C.; Bayer, C. W.

1990-01-01T23:59:59.000Z

273

14 - Cost modelling of coal power plant start-up in cyclical operation  

Science Journals Connector (OSTI)

Abstract: It has long been recognized that large coal plants that are exposed to cyclic operation incur more damage and have higher maintenance costs than units which operate in a base load regimen. This chapter reviews historical studies that have attempted to model the costs of cycling for these units from both bottom-up and top-down perspectives. It describes recent research at the component, unit and system level which attempts to forecast maintenance costs in the high-cycling scenarios likely to result from changes in the relative cost of fuel and the expansion of renewable energy sources.

P. Keatley

2014-01-01T23:59:59.000Z

274

Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Vehicle Maintenance to Vehicle Maintenance to Conserve Fuel to someone by E-mail Share Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Facebook Tweet about Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Twitter Bookmark Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Google Bookmark Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Delicious Rank Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Digg Find More places to share Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on AddThis.com... More in this section... Idle Reduction Parts & Equipment Maintenance Driving Behavior Fleet Rightsizing System Efficiency Vehicle Maintenance to Conserve Fuel A comprehensive vehicle maintenance strategy can help fleet managers and

275

Rationale for cost-effective laboratory medicine.  

Science Journals Connector (OSTI)

...hospital, work load has increased...to contain costs in the DRG...limit future capital funds for...mechanism to control total health...Although computers can track...performed more cost effectively...investment in capital equipment...in a more cost-efficient...sufficient work load and multiple...of quality control, auto...hospital via computer, telephone...

A Robinson

1994-04-01T23:59:59.000Z

276

Renewable Portfolio Standards: Costs and Benefits (Poster)  

SciTech Connect (OSTI)

This report summarizes state-level RPS costs to date, and considers how those costs may evolve going forward given scheduled increases in RPS targets and cost containment mechanisms. The report also summarizes RPS benefits estimates, based on published studies for individual states and discusses key methodological considerations.

Bird, L.; Heeter, J.; Barbose, G.; Weaver, S.; Flores, F.; Kuskova-Burns, K.; Wiser, R.

2014-10-01T23:59:59.000Z

277

A computer-based total productive maintenance model for electric motors  

Science Journals Connector (OSTI)

The paper describes the development of a computer-based total productive maintenance (TPM) model to improve electrical motors readiness and uptime while reducing capital overhead. The TPM model includes the consideration of reactive, periodic, and predictive practices. The input data is processed and the generated report details a set of periodic recommendations providing guidelines on recommended actions and their frequency. The details about test results indicating the current condition of the motor as well estimated reactive, periodic, and predictive maintenance cost details are presented. Based on the historic data stored in its database, the model can predict potential problems prior to failure as well as prescribe periodic maintenance actions to maximise motor life. The TPM model will be a useful tool to predict the degradation in motor life due to deterioration in insulation, bearing, rotor bar and stator windings of the motor.

Aruna Muniswamy; Bhaskaran Gopalakrishnan; Subodh Chaudhari; Majid Jaridi; Ed Crowe; Deepak Gupta

2014-01-01T23:59:59.000Z

278

Small Wind Guidebook/Where Can I Find Installation and Maintenance Support  

Open Energy Info (EERE)

Where Can I Find Installation and Maintenance Support Where Can I Find Installation and Maintenance Support < Small Wind Guidebook Jump to: navigation, search Print PDF WIND ENERGY STAKEHOLDER ENGAGEMENT & OUTREACHSmall Wind Guidebook Home WindTurbine-icon.png Small Wind Guidebook * Introduction * First, How Can I Make My Home More Energy Efficient? * Is Wind Energy Practical for Me? * What Size Wind Turbine Do I Need? * What Are the Basic Parts of a Small Wind Electric System? * What Do Wind Systems Cost? * Where Can I Find Installation and Maintenance Support? * How Much Energy Will My System Generate? * Is There Enough Wind on My Site? * How Do I Choose the Best Site for My Wind Turbine? * Can I Connect My System to the Utility Grid? * Can I Go Off-Grid? * State Information Portal * Glossary of Terms * For More Information

279

A survey of HVDC operating and maintenance practices and their impact on reliability and performance  

SciTech Connect (OSTI)

A questionnaire about operating, maintenance, and spare parts practices and station performance was sent to all HVDC converter stations worldwide. This survey is sponsored by IEEE Working Groups 15.05.08, Economics and Operating Strategies, and I7, Reliability of HVDC Converter Stations. Responses from 38 stations are analyzed, and information bout the most popular practices is reported. One important conclusion is that energy contracts, ac system constraints, and dedicated generation frequency have strong influences on the operation and maintenance practices of HVDC stations. A search is made for correlations between the operating, maintenance, and spare parts practices, including spending, and the stations` performance and availability. No conclusions about the most cost-effective practices can be made. The results are compared with those of a study published in 1992 which covered a few of the same topics.

Cochrane, J.J.; Emerson, M.P. [New England Power Co., Ayer, MA (United States)] [New England Power Co., Ayer, MA (United States); Donahue, J.A. [New England Power Service Co., Westborough, MA (United States)] [New England Power Service Co., Westborough, MA (United States); Wolf, G. [Public Service of New Mexico, Albuquerque, NM (United States)] [Public Service of New Mexico, Albuquerque, NM (United States)

1996-01-01T23:59:59.000Z

280

Evaluation of the Total Cost of Ownership of Fuel Cell-Powered Material Handling Equipment  

SciTech Connect (OSTI)

This report discusses an analysis of the total cost of ownership of fuel cell-powered and traditional battery-powered material handling equipment (MHE, or more typically 'forklifts'). A number of fuel cell MHE deployments have received funding support from the federal government. Using data from these government co-funded deployments, DOE's National Renewable Energy Laboratory (NREL) has been evaluating the performance of fuel cells in material handling applications. NREL has assessed the total cost of ownership of fuel cell MHE and compared it to the cost of ownership of traditional battery-powered MHE. As part of its cost of ownership assessment, NREL looked at a range of costs associated with MHE operation, including the capital costs of battery and fuel cell systems, the cost of supporting infrastructure, maintenance costs, warehouse space costs, and labor costs. Considering all these costs, NREL found that fuel cell MHE can have a lower overall cost of ownership than comparable battery-powered MHE.

Ramsden, T.

2013-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "increased maintenance costs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Cost Model and Cost Estimating Software  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter discusses a formalized methodology is basically a cost model, which forms the basis for estimating software.

1997-03-28T23:59:59.000Z

282

Neural-Network-Based Maintenance Decision Model for Diesel Engine  

Science Journals Connector (OSTI)

To decrease the fuzzy and uncertain factors in the maintenance decision models of diesel engine, a combination BP-neural-network-based maintenance decision model for diesel engine is presented in this paper. It can make the maintenance of diesel engine ... Keywords: Deterioration degree, Diesel engine, Maintenance decision, Neural network

Yingkui Gu; Juanjuan Liu; Shuyun Tang

2008-09-01T23:59:59.000Z

283

University Marketing Communications UMC Web Site Maintenance Service  

E-Print Network [OSTI]

University Marketing Communications UMC Web Site Maintenance Service Overview Content management and ongoing Web site maintenance is an essential part of any Web project plan. When developing a new Web site in Web maintenance activities. Benefits Our Web maintenance service gives you ongoing access to our group

Sibille, Etienne

284

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: Energy.gov (indexed) [DOE]

Chapter 1 Introduction and Overview The purpose of this guide is to provide you, the Operations and Maintenance (O&M)/Energy manager and practitioner, with useful information about O&M management, technologies, energy and water efficiency, and cost-reduction approaches. To make this guide useful and to reflect your needs and concerns, the authors met with O&M and Energy managers via Federal Energy Management Program (FEMP) workshops. In addition, the authors conducted extensive literature searches and contacted numerous vendors and industry experts. The information and case studies that appear in this guide resulted from these activities. It needs to be stated at the outset that this guide is designed to provide information on effective

285

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: Energy.gov (indexed) [DOE]

9 O&M Ideas for Major Equipment Types 9 O&M Ideas for Major Equipment Types 9.1 Introduction At the heart of all O&M lies the equipment. Across the Federal sector, this equipment varies greatly in age, size, type, model, fuel used, condition, etc. While it is well beyond the scope of this guide to study all equipment types, we tried to focus our efforts on the more common types prevalent in the Federal sector. The objectives of this chapter are the following: * Present general equipment descriptions and operating principles for the major equipment types. * Discuss the key maintenance components of that equipment. * Highlight important safety issues. * Point out cost and energy efficiency issues. * Highlight any water-related efficiency impacts issues. * Provide recommended general O&M activities in the form of checklists.

286

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: Energy.gov (indexed) [DOE]

1 Introduction and Overview 1 Introduction and Overview The purpose of this guide is to provide you, the Operations and Maintenance (O&M)/Energy manager and practitioner, with useful information about O&M management, technologies, energy and water efficiency, and cost-reduction approaches. To make this guide useful and to reflect your needs and concerns, the authors met with O&M and Energy managers via Federal Energy Management Program (FEMP) workshops. In addition, the authors conducted extensive literature searches and contacted numerous vendors and industry experts. The information and case studies that appear in this guide resulted from these activities. It needs to be stated at the outset that this guide is designed to provide information on effective O&M as it applies to systems and equipment typically found at Federal facilities. This guide is not

287

Federal Energy Management Program: Operations and Maintenance Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Measurement to someone by E-mail Measurement to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Measurement on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Program Measurement on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Program Measurement on Google Bookmark Federal Energy Management Program: Operations and Maintenance Program Measurement on Delicious Rank Federal Energy Management Program: Operations and Maintenance Program Measurement on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Program Measurement on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

288

Federal Energy Management Program: Operations and Maintenance Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Management Support to someone by E-mail Management Support to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Management Support on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Management Support on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Management Support on Google Bookmark Federal Energy Management Program: Operations and Maintenance Management Support on Delicious Rank Federal Energy Management Program: Operations and Maintenance Management Support on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Management Support on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

289

Cost Study Manual  

Broader source: Energy.gov (indexed) [DOE]

28, 2012 28, 2012 Cost Study Manual Executive Summary This Cost Study Manual documents the procedures for preparing a Cost Study to compare the cost of a contractor's employee benefits to the industry average from a broad-based national benefit cost survey. The annual Employee Benefits Cost Study Comparison (Cost Study) assists with the analysis of contractors' employee benefits costs. The Contracting Officer (CO) may require corrective action when the average benefit per capita cost or the benefit cost as a percent of payroll exceeds the comparator group by more than five percent. For example, if per capita benefit costs for the comparator group are $10,000 and the benefit costs as a percent of payroll for the comparator group are 20%, the threshold for the contractor's benefits as a

290

Activity Based Costing  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Activity Based Costing (ABC) is method for developing cost estimates in which the project is subdivided into discrete, quantifiable activities or a work unit. This chapter outlines the Activity Based Costing method and discusses applicable uses of ABC.

1997-03-28T23:59:59.000Z

291

Levelized Electricity Costs  

Science Journals Connector (OSTI)

The concept of levelized energy costs responds to the necessity of disclosing the ... in order to recover the total life cycle cost of energy production. This chapter charts the effectiveness of levelized cost fo...

Nuno Luis Madureira

2014-01-01T23:59:59.000Z

292

Operations and Maintenance Manual | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Manual Manual Operations and Maintenance Manual October 16, 2013 - 5:00pm Addthis Closeout of the construction phase for renewable energy projects includes the creation of a comprehensive operations and maintenance (O&M) manual. Although specific content varies depending on the size, scope, and complexity of the project, the O&M manual typically includes manufacturer literature, basic operating procedures, troubleshooting techniques, measurement and verification (M&V) system documentation, and maintenance information. The general contractor should compile O&M documentation, gather as-built drawings for equipment and systems, and take the lead in organizing the manual. The commissioning agent reviews the manual to verify that it includes all necessary documentation, including:

293

POST-DEACTIVATION SURVEILLANCE AND MAINTENANCE PLANNING  

Broader source: Energy.gov (indexed) [DOE]

POST-DEACTIVATION SURVEILLANCE AND POST-DEACTIVATION SURVEILLANCE AND MAINTENANCE PLANNING Post-Deactivation Surveillance and Maintenance Planning Dependence of End-Points Planning on S&M Planning Primary Surveillance Concerns Typical Deactivation S&M Plan Contents Example of a Post-Deactivation S&M Plan Dependence of End-Points Planning on S&M Planning One of the key elements of end-point planning is knowing what the post-deactivation S&M activities will be so that conditions can be established to support them. The post-deactivation S&M plan specifies the surveillance, inspection, and maintenance of the facility in the deactivated state. It should address the activities, the locations in which they will be conducted, and their frequency. Part of the S&M planning is

294

34 - Pipeline Commissioning, Operations, and Maintenance  

Science Journals Connector (OSTI)

Abstract The commissioning of a pipeline involves the activities after installation required to place the system into services, which activities include hydrostatic testing, cleaning and drying, and the introduction of the product to be transported into the pipeline. Pipeline operations are generally carried out by the pipeline operating company. Detailed operation and maintenance procedures specific to the pipeline should be available for use before the pipeline is commissioned and handed over to operation. Manuals for operation and maintenance should be prepared, setting out the schedules, procedures, and instructions on which activities are to be carried out, including liaison with third parties. In this chapter, the procedures of commissioning, operation, and maintenance of subsea pipeline are detailed.

Qiang Bai; Yong Bai

2014-01-01T23:59:59.000Z

295

Apply reliability centered maintenance to sealless pumps  

SciTech Connect (OSTI)

This paper reports on reliability centered maintenance (RCM) which is considered a crucial part of future reliability engineering. RCM determines the maintenance requirements of plants and equipment in their operating context. The RCM method has been applied to the management of critical sealless pumps in fire/toxic risk services, typical of the petrochemical industry. The method provides advantages from a detailed study of any critical engineering system. RCM is a team exercise and fosters team spirit in the plant environment. The maintenance strategy that evolves is based on team decisions and relies on maximizing the inherent reliability built into the equipment. RCM recommends design upgrades where this inherent reliability is being questioned. Sealless pumps of canned motor design are used as main reactor charge pumps in PVC plants. These pumps handle fresh vinyl chloride monomer (VCM), which is both carcinogenic and flammable.

Pradhan, S. (Exxon Chemicals Canada, Ontario (Canada))

1993-01-01T23:59:59.000Z

296

Guidance for UMTRA project surveillance and maintenance  

SciTech Connect (OSTI)

The Guidance for UMTRA Project Surveillance and Maintenance describes the procedures that will be used to verify that Uranium Mill Tailings Remedial Action (UMTRA) Project disposal sites continue to function as designed. The approach of this guidance document is to identify surveillance requirements and maintenance procedures that will be used to comply with NRC license requirements. This document addresses five primary activities: Definition and characterization of final site conditions. Site inspections; Ground-water monitoring; Aerial photography; and Custodial maintenance and contingency repair. Final site conditions will be defined and characterized prior to the completion of remedial actions at a site. As-built drawings will be compiled, a final topographic survey will be performed, a vicinity map will be prepared, and ground and aerial photographs will be taken. Survey monuments, site markers, and signs will be established as will a network of monitoring wells.

NONE

1986-01-01T23:59:59.000Z

297

Predicting electricity consumption and cost for South African mines / S.S. (Stephen) Cox.  

E-Print Network [OSTI]

??Electricity costs in South Africa have risen steeply; there are a number of factors that have contributed to this increase. The increased costs have a (more)

Cox, Samuel Stephen

2013-01-01T23:59:59.000Z

298

Relationship between maintenance energy requirement, mineral salts and efficiency of glucose to ethanol conversion by Zymomonas mobilis  

Science Journals Connector (OSTI)

Minimizing the usage of glucose carbon for growth and cell maintenance energy requirement, specific glucose uptake rates, specific ethanol production rates were increased 5-fold. At...?1 and Yg = 0.0070.009, ethanol

S. Cromie; H. W. Doelle

1980-08-01T23:59:59.000Z

299

Methods | Transparent Cost Database  

Open Energy Info (EERE)

information NREL has developed the following cost of energy tools: System Advisor Model (SAM): https:sam.nrel.gov SAM makes performance predictions and cost of...

300

Steam Trap Maintenance as a Profit Center  

E-Print Network [OSTI]

the Eighteenth Industrial Energy Technology Conference, Houston, TX, April 17-18, 1996 EXCUSES Everybody thinks his or her steam trap maintenance is good. Surveysl have shown the following are the most popular excuses encountered when managers are confronted... for steam traps. 192 ESL-IE-96-04-28 Proceedings from the Eighteenth Industrial Energy Technology Conference, Houston, TX, April 17-18, 1996 5. Set up a trap maintenance program C. Prepare and present a report to that will: management on the results...

Bouchillon, J. L.

Note: This page contains sample records for the topic "increased maintenance costs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States  

Broader source: Energy.gov [DOE]

For the United States to ensure that the substantial rollout of offshore wind energy projects envisioned by the DOE is carried out in an efficient and cost-effective manner, it is important to observe the current and emerging practices in the international offshore wind energy industry. In this manner, the United States can draw from the experience already gained around the world, combined with experience from the sizeable U.S. land-based wind industry, to develop a strong offshore wind sector. The work detailed in this report will support that learning curve by enabling optimization of the cost-effectiveness of installation, operation, and maintenance activities for offshore wind farms.

302

Cost reduction potential in LMFBR design  

SciTech Connect (OSTI)

LWR capital costs have escalated continuously over the years to the point where today its economics represent a bar to further LWR deployment in the U.S. High initial costs and the promise of a similar pattern of cost escalation in succeeding years for the LMFBR would effectively stop LMFBR deployment in this country before it could even begin. LWR cost escalation in the main can be traced to large increases in both amounts and unit costs of construction materials and to greatly lengthened construction times. Innovative approaches to LMFBR design are now being pursued that show promise for substantial cost reductions particularly in those areas that have contributed most to LWR cost increases.

Chang, Y.I.; Till, C.E.

1983-08-01T23:59:59.000Z

303

Energy Department Announces $9 Million to Lower Costs, Increase...  

Office of Environmental Management (EM)

lifetime performance of the modules. Key focus areas will include using physics and chemistry and advanced data analysis to gain a better understanding of why solar modules fail,...

304

Determinants of Increased Energy Cost in Prosthetic Gait.  

E-Print Network [OSTI]

??The physiological energy requirements of prosthetic gait in lower-limb amputees have been observed to be significantly greater than those for able-bodied subjects. However, existing models (more)

Peasgood, Michael

2006-01-01T23:59:59.000Z

305

Highly Insulating Windows - Cost  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cost Cost The following is an estimate of the cost effective incremental cost of highly-insulating windows (U-factor=0.20 Btu/hr-ft2-F) compared to regular ENERGY STAR windows (U-factor 0.35 Btu/hr-ft2-F). Energy savings from lower U-factors were simulated with RESFEN over an assumed useful window life of 25 years. To determine the maximum incremental cost at which highly-insulating windows would still be cost-effective, we used a formula used by many utility companies to calculate the cost of saved energy from energy efficiency programs, based on the programs' cost and savings. We turned this formula around so that the cost of saved energy equals the present energy prices in the studied locations, whereas the program cost (the incremental cost of the windows) is the dependent variable. By entering 5%

306

INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE ...  

Broader source: Energy.gov (indexed) [DOE]

INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating Procedures INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating...

307

Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Maintenance and Safety to someone by E-mail Maintenance and Safety to someone by E-mail Share Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Facebook Tweet about Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Twitter Bookmark Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Google Bookmark Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Delicious Rank Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Digg Find More places to share Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on AddThis.com... More in this section... Natural Gas Basics Benefits & Considerations Stations Vehicles Availability Conversions Emissions Maintenance & Safety

308

Emission control cost-effectiveness of alternative-fuel vehicles  

SciTech Connect (OSTI)

Although various legislation and regulations have been adopted to promote the use of alternative-fuel vehicles for curbing urban air pollution problems, there is a lack of systematic comparisons of emission control cost-effectiveness among various alternative-fuel vehicle types. In this paper, life-cycle emission reductions and life-cycle costs were estimated for passenger cars fueled with methanol, ethanol, liquefied petroleum gas, compressed natural gas, and electricity. Vehicle emission estimates included both exhaust and evaporative emissions for air pollutants of hydrocarbon, carbon monoxide, nitrogen oxides, and air-toxic pollutants of benzene, formaldehyde, 1,3-butadiene, and acetaldehyde. Vehicle life-cycle cost estimates accounted for vehicle purchase prices, vehicle life, fuel costs, and vehicle maintenance costs. Emission control cost-effectiveness presented in dollars per ton of emission reduction was calculated for each alternative-fuel vehicle types from the estimated vehicle life-cycle emission reductions and costs. Among various alternative-fuel vehicle types, compressed natural gas vehicles are the most cost-effective vehicle type in controlling vehicle emissions. Dedicated methanol vehicles are the next most cost-effective vehicle type. The cost-effectiveness of electric vehicles depends on improvements in electric vehicle battery technology. With low-cost, high-performance batteries, electric vehicles are more cost-effective than methanol, ethanol, and liquified petroleum gas vehicles.

Wang, Q. [Argonne National Lab., IL (United States); Sperling, D.; Olmstead, J. [California Univ., Davis, CA (United States). Inst. of Transportation Studies

1993-06-14T23:59:59.000Z

309

Cost estimate of electricity produced by TPV  

Science Journals Connector (OSTI)

A crucial parameter for the market penetration of TPV is its electricity production cost. In this work a detailed cost estimate is performed for a Si photocell based TPV system, which was developed for electrically self-powered operation of a domestic heating system. The results are compared to a rough estimate of cost of electricity for a projected GaSb based system. For the calculation of the price of electricity, a lifetime of 20 years, an interest rate of 4.25% per year and maintenance costs of 1% of the investment are presumed. To determine the production cost of TPV systems with a power of 1220 kW, the costs of the TPV components and 100 EUR kW?1el,peak for assembly and miscellaneous were estimated. Alternatively, the system cost for the GaSb system was derived from the cost of the photocells and from the assumption that they account for 35% of the total system cost. The calculation was done for four different TPV scenarios which include a Si based prototype system with existing technology (?sys = 1.0%), leading to 3000 EUR kW?1el,peak, an optimized Si based system using conventional, available technology (?sys = 1.5%), leading to 900 EUR kW?1el,peak, a further improved system with future technology (?sys = 5%), leading to 340 EUR kW?1el,peak and a GaSb based system (?sys = 12.3% with recuperator), leading to 1900 EUR kW?1el,peak. Thus, prices of electricity from 6 to 25 EURcents kWh?1el (including gas of about 3.5 EURcents kWh?1) were calculated and compared with those of fuel cells (31 EURcents kWh?1) and gas engines (23 EURcents kWh?1).

Gnther Palfinger; Bernd Bitnar; Wilhelm Durisch; Jean-Claude Mayor; Detlev Grtzmacher; Jens Gobrecht

2003-01-01T23:59:59.000Z

310

Electricity Plant Cost Uncertainties (released in AEO2009)  

Reports and Publications (EIA)

Construction costs for new power plants have increased at an extraordinary rate over the past several years. One study, published in mid-2008, reported that construction costs had more than doubled since 2000, with most of the increase occurring since 2005. Construction costs have increased for plants of all types, including coal, nuclear, natural gas, and wind.

2009-01-01T23:59:59.000Z

311

Reliable Link Maintenance in Cognitive Radio Systems  

E-Print Network [OSTI]

resources and overcome the under-utilization of licensed spectrum. Since the licensed user still keeps) have to vacate the spectrum in case the licensed user claims it. In order to maintain the qualityReliable Link Maintenance in Cognitive Radio Systems Daniel Willkomm, James Gross and Adam Wolisz

Gross, James

312

Reliability centered maintenance for substation equipment  

SciTech Connect (OSTI)

This paper is a collection of training materials on the principles and implementation of reliability centered maintenance. The main areas discussed in this presentation are organized as follows: RCM principles and concepts; RCM tools, resources and methods; overview of the RCM process; example RCM application; living PM program; RCM implementation experience.

NONE

1996-08-01T23:59:59.000Z

313

ICD Complex Operations and Maintenance Plan  

SciTech Connect (OSTI)

This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

Gibson, P. L.

2007-06-25T23:59:59.000Z

314

Maintenance efficace de documents XML volumineux  

E-Print Network [OSTI]

or maintain temporal XML documents, keeping track of data evolution over time. In this paper, we followMaintenance efficace de documents XML volumineux Mohamed-Amine Baazizi 1 , Nicole Bidoit 1 , Dario générer ou maintenir des documents és- tampillés garantissant un stockage efficace. Pour ce faire, nous

Boyer, Edmond

315

Project Surveillance and Maintenance Plan. [UMTRA Project  

SciTech Connect (OSTI)

The Project Surveillance and Maintenance Plan (PSMP) describes the procedures that will be used by the US Department of Energy (DOE), or other agency as designated by the President to verify that inactive uranium tailings disposal facilities remain in compliance with licensing requirements and US Environmental Protection Agency (EPA) standards for remedial actions. The PSMP will be used as a guide for the development of individual Site Surveillance and Maintenance Plans (part of a license application) for each of the UMTRA Project sites. The PSMP is not intended to provide minimum requirements but rather to provide guidance in the selection of surveillance measures. For example, the plan acknowledges that ground-water monitoring may or may not be required and provides the (guidance) to make this decision. The Site Surveillance and Maintenance Plans (SSMPs) will form the basis for the licensing of the long-term surveillance and maintenance of each UMTRA Project site by the NRC. Therefore, the PSMP is a key milestone in the licensing process of all UMTRA Project sites. The Project Licensing Plan (DOE, 1984a) describes the licensing process. 11 refs., 22 figs., 8 tabs.

Not Available

1985-09-01T23:59:59.000Z

316

Contracting with reading costs and renegotiation costs  

E-Print Network [OSTI]

OF CALIFORNIA, SAN DIEGO Contracting with Reading Costs andrents, and the competitive contracting process. Journal ofReiche. Foundation of incomplete contracting in a model of

Brennan, James R.

2007-01-01T23:59:59.000Z

317

Cost Estimation Package  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter focuses on the components (or elements) of the cost estimation package and their documentation.

1997-03-28T23:59:59.000Z

318

Life Cycle Cost Estimate  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Life-cycle costs (LCCs) are all the anticipated costs associated with a project or program alternative throughout its life. This includes costs from pre-operations through operations or to the end of the alternative.This chapter discusses life cycle costs and the role they play in planning.

1997-03-28T23:59:59.000Z

319

A chronicle of costs  

SciTech Connect (OSTI)

This report contains the history of all estimated costs associated with the superconducting super collider.

Elioff, T.

1994-04-01T23:59:59.000Z

320

Brine clarity maintenance in salinity-gradient solar ponds  

Science Journals Connector (OSTI)

Brine transparency is an important part of the maintenance of a salinity-gradient solar pond as it affects the amount of solar radiation reaching the storage zone and hence has an influence on the thermal performance. There is a wide range of factors that can hinder the transmission of light in a solar pond. Algal and microbial growths are the most common problems encountered in working solar ponds and control of their densities is essential to maintain transparency. Two different chemical treatment methods for algae growth prevention are described in this paper: chlorine and a novel chemical product copper ethylamine complex. The latter method has never been implemented previously in a working pond. This paper discusses the theory of the algae control methods used and presents the experimental results of the chemical treatments. The results showed that Cupricide is more effective than chlorine and is therefore the recommended chemical for algae control in solar ponds; it improves the water transparency especially in the upper convective zone and lower convective zone with all measurement values less than 1 NTU. Chlorine was found to be more corrosive than Cupricide due to the acidic effect it has on the pH. The preliminary cost analysis showed that granular chlorine is the cheapest chemical. A more detailed financial analysis is nevertheless required to refine these costs.

Neus Gasulla; Yusli Yaakob; Jimmy Leblanc; Aliakbar Akbarzadeh; Jose Luis Cortina

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "increased maintenance costs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Low Cost, Durable Seal  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cost, Durable Seal Cost, Durable Seal George M. Roberts UTC Power Corporation February 14, 2007 This presentation does not contain any proprietary or confidential information 1 LOW COST, DURABLE SEAL Outline * Project Objective * Technical Approach * Timeline * Team Roles * Budget * Q&A 2 LOW COST, DURABLE SEAL Project Objective Develop advanced, low cost, durable seal materials and sealing techniques amenable to high volume manufacture of PEM cell stacks. DOE Targets/Goals/Objectives Project Goal Durability Transportation: 5,000 hr Stationary: 40,000 hr Durability Improve mechanical and chemical stability to achieve 40,000 hr of useful operating life. Low Cost Low Cost A material cost equivalent to or less than the cost of silicones in common use. 3 LOW COST, DURABLE SEAL

322

Resources on Operations and Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Operations & Maintenance » Resources on Operations & Maintenance » Resources on Operations and Maintenance Resources on Operations and Maintenance October 7, 2013 - 9:55am Addthis Many helpful resources about operations and maintenance are available. Also see Contacts. Best Practices Operations and Maintenance Best Practices Guide: Document outlines best practices to help Federal agencies implement effective O&M for systems and equipment found at their facilities. Federal Facilities Council: Website featuring events, reports, and links to National Academy websites. Commissioning Commissioning for Federal Facilities: Comprehensive information about ongoing commissioning processes to resolve operating problems, improve comfort, optimize energy use, and identify retrofits for commercial and

323

MINLP model for optimal biocide dosing and maintenance scheduling of seawater cooled plants  

Science Journals Connector (OSTI)

Abstract Nowadays many countries in arid regions around the world suffer from severe water shortages; this situation is steadily becoming a global concern as water resources are being depleted. In this regard, strategies that a few decades ago were not feasible are becoming interesting alternatives; one of them is the use of seawater as cooling fluid in chemical plants. This alternative, however, presents problems in the plant operation, including a rapid biofilm growth (biofouling) that reduces the heat transfer efficiency. To control the biofouling, the use of biocides (usually chlorine) and periodical mechanical maintenances are implemented. In this work a mathematical programming model is presented for the optimal planning of biocide dosing and mechanical maintenance scheduling. The model considers the biocide kinetics along the network, its dependence with temperature and its interaction with the biofilm thickness. The model uses disjunctive programming to select the optimal maintenance scenario, allowing for different levels of biofilm thickness that depend on the plant schedule. The model also includes environmental constraints to prevent the discharge of streams with potentially dangerous loads of chemicals. These constraints include a limit for the concentration of biocide and the end of pipe chemical treatment. The objective function is to minimize the total annual cost, including the cost for the biocide, chemicals used for end of pipe treatment and maintenance. To show the model applicability, a case study for an integrated power/desalination plant cooled with seawater is solved. Several scenarios were tested including daily, biweekly, monthly and bimonthly biocide and end of pipe treatment chemical dosing, and mechanical maintenances from one to up to six times per year. The results indicate that recurrent dosing policies, either biweekly or monthly for operational simplicity, along with a maximum of three treatments per year provide an optimal scenario.

Fabricio Npoles-Rivera; Abdullah Bin Mahfouz; Arturo Jimnez-Gutirrez; Mahmoud M. El-Halwagi; Jos Mara Ponce-Ortega

2012-01-01T23:59:59.000Z

324

Consumer Winter Heating Oil Costs  

Gasoline and Diesel Fuel Update (EIA)

6 6 Notes: The outlook for heating oil costs this winter, due to high crude oil costs and tight heating oil supplies, breaks down to an expected increase in heating expenditures for a typical oil-heated household of more than $200 this winter, the result of an 18% increase in the average price and an 11% increase in consumption. The consumption increase is due to the colder than normal temperatures experienced so far this winter and our expectations of normal winter weather for the rest of this heating season. Last winter, Northeast heating oil (and diesel fuel) markets experienced an extremely sharp spike in prices when a severe weather situation developed in late January. It is virtually impossible to gauge the probability of a similar (or worse) price shock recurring this winter,

325

Optimizing program increases field's profits  

SciTech Connect (OSTI)

By combining benefits of several techniques to increase production and cut drilling and completion costs, Royal Oil and Gas Corp. has increased profitability on it leases in the AWP (Olmos) field, and made the operations economical in the 1988 price environment. The optimization program has included modifying fracture treatments, refracturing older wells, infill drilling, and down sizing of tubulars. Royal has also participated in consortium efforts to increase AWP (Olmos) production through analysis using a borehole televiewer, microfracturing, and history matching. Study of reservoir changes since the beginning of production has led Royal to alter its fracture stimulation designs to reduce treatment sizes that can further increase savings.

Huebinger, T.; Webster, D.; Chrisholm, P.; Venditto, J.; Hunt, J.

1988-08-29T23:59:59.000Z

326

Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Ryder Opens Natural Ryder Opens Natural Gas Vehicle Maintenance Facility to someone by E-mail Share Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Facebook Tweet about Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Twitter Bookmark Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Google Bookmark Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Delicious Rank Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Digg Find More places to share Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on AddThis.com... June 28, 2011 Ryder Opens Natural Gas Vehicle Maintenance Facility

327

SURVEILLANCE AND MAINTENANCE RBSM The Requirements Based Surveillance  

Broader source: Energy.gov (indexed) [DOE]

AND MAINTENANCE AND MAINTENANCE RBSM The Requirements Based Surveillance and Maintenance Review Process Surveillance and Maintenance Overview What is RBSM and why do I need this process? Who has used this process so far? A Summary of RBSM results across the DOE complex Viewing a sample RBSM report Performing RBSM at your facility RBSM Guidance package Surveillance and Maintenance Overview Overall direction for surveillance and maintenance of excess facilities is addressed in DOE G 430.1-2, IMPLEMENTATION GUIDE FOR SURVEILLANCE AND MAINTENANCE DURING FACILITY TRANSITION AND DISPOSITION. In addition, the change in mission and operation of an excess facility should stimulate a review of surveillance and maintenance to determine what efficiencies can be gained as a result of the change.

328

Surveillance & Maintenance: The Requirements Based Surveillance and  

Broader source: Energy.gov (indexed) [DOE]

Surveillance & Maintenance: The Requirements Based Surveillance and Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Overall direction for surveillance and maintenance of excess facilities is addressed in DOE G 430.1-2, IMPLEMENTATION GUIDE FOR SURVEILLANCE AND MAINTENANCE DURING FACILITY TRANSITION AND DISPOSITION. In addition, the change in mission and operation of an excess facility should stimulate a review of surveillance and maintenance to determine what efficiencies can be gained as a result of the change. Such a review can be applied to facilities that undergoing stabilization, those intended for deactivation, and others destined for decommissioning. The material that follows provides

329

Article Published on LED Lumen Maintenance and Light Loss Factors...  

Broader source: Energy.gov (indexed) [DOE]

Article Published on LED Lumen Maintenance and Light Loss Factors Article Published on LED Lumen Maintenance and Light Loss Factors January 20, 2014 - 12:00am Addthis An article...

330

Energy Conservation Thru Steam Trap Surveys and Preventive Maintenance Programs  

E-Print Network [OSTI]

ENERGY CONSERVATION THRU STEAM TRAP SURVEYS AND PREVENTIVE MAINTENANCE PROGRAMS Terry Boynton, Armstrong, Three Rivers, Mich. Bob Dewhirst, Armstrong, New Braunfels, Texas. This paper will deal with steam trap surveys and preventive maintenance...

Boynton, T.; Dewhirst, B.

1980-01-01T23:59:59.000Z

331

Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

CNG Fuel System and CNG Fuel System and Cylinder Maintenance to someone by E-mail Share Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Facebook Tweet about Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Twitter Bookmark Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Google Bookmark Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Delicious Rank Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Digg Find More places to share Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on AddThis.com... More in this section... Natural Gas Basics Benefits & Considerations Stations Vehicles Availability Conversions Emissions Maintenance & Safety

332

Managing County Employee Health Care Costs The Problem  

E-Print Network [OSTI]

Managing County Employee Health Care Costs The Problem If food costs increased at same rate as health care, one dozen eggs would cost $80.20! 87.5% of health-care claims are due to employees cholesterol, and inactivity. Costs include unnecessary use of health-care services: 25% of doctor visits

333

Operations Cost Allocation Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Operations Consolidation Project Operations Consolidation Project Operations Consolidation Project (OCP) Cost Allocation Presentation - September 20, 2011 OCP Cost Allocation Customer Presentation List of Acronyms OCP Cost Allocation Spreadsheets OCP Cost Allocation Customer Presentation - Questions and Answers - September 19 - 20, 2011 Additional Questions and Answers Customer Comments/Questions and Answers: Arizona Municipal Power Users Association Arizona Power Authority Central Arizona Project Colorado River Commission Colorado River Energy Distributors Association City of Gilbert, AZ Irrigation and Electrical Districts Association of Arizona Town of Marana, AZ City of Mesa, AZ Town of Wickenburg, AZ Western's Final Decision Regarding the Long-Term Cost Allocation Methodology for Operations Staff Costs

334

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: Energy.gov [DOE]

Guide covers version 3.0 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

335

Maintenance and Operations study for K basins sludge treatment  

SciTech Connect (OSTI)

This study evaluates maintenance and operating concepts for the chemical treatment of sludge from the 100 K Basins at Hanford. The sludge treatment equipment that will require remote operation or maintenance was identified. Then various maintenance and operating concepts used in the nuclear industry were evaluated for applicability to sludge treatment. A hot cell or cells is recommended as the best maintenance and operating concept for a sludge treatment facility.

WESTRA, A.G.

1998-11-30T23:59:59.000Z

336

Comparison of costs for solidification of high-level radioactive waste solutions: glass monoliths vs metal matrices  

SciTech Connect (OSTI)

A comparative economic analysis was made of four solidification processes for liquid high-level radioactive waste. Two processes produced borosilicate glass monoliths and two others produced metal matrix composites of lead and borosilicate glass beads and lead and supercalcine pellets. Within the uncertainties of the cost (1979 dollars) estimates, the cost of the four processes was about the same, with the major cost component being the cost of the primary building structure. Equipment costs and operating and maintenance costs formed only a small portion of the building structure costs for all processes.

Jardine, L.J.; Carlton, R.E.; Steindler, M.J.

1981-05-01T23:59:59.000Z

337

Operations and Maintenance Team | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Team Team Operations and Maintenance Team October 16, 2013 - 5:00pm Addthis Assembling the right set of skills and resources to operate and maintain a renewable energy system is critical. Renewable energy technologies only perform as specified when managed by a well-trained, highly motivated operations and maintenance (O&M) team. For a renewable energy project financed through an energy savings performance contract (ESPC) or a power purchase agreement (PPA), primary O&M services are typically delivered as part of the agreement, but in-house staff will need some familiarity with the system. For agency-funded projects, O&M services may be provided by in-house facilities staff, a contracted service provider, or a combination of the two. Experienced O&M staff can provide valuable input and should be included in

338

Operations and Maintenance Training | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Training Training Operations and Maintenance Training October 16, 2013 - 5:01pm Addthis Key Actions in O&M Training Have O&M staff shadow Commissioning Agent during commissioning for early interaction with new renewable energy equipment. Train facility staff fully on O&M manual and building systems, regardless of O&M contracts on renewable energy systems. Provide key facility staff with general renewable energy and LEED training prior to building start-up. Look for opportunities for O&M staff to learn from external O&M contractors. To keep a renewable energy system performing at optimal levels, operations and maintenance (O&M) personnel must receive thorough training. A renewable energy system may be properly installed, but without a robust O&M program in place, it will not perform as specified over the long-term.

339

The feasibility of replacing or upgrading utility distribution transformers during routine maintenance  

SciTech Connect (OSTI)

It is estimated that electric utilities use about 40 million distribution transformers in supplying electricity to customers in the United States. Although utility distribution transformers collectively have a high average efficiency, they account for approximately 61 billion kWh of the 229 billion kWh of energy lost annually in the delivery of electricity. Distribution transformers are being replaced over time by new, more efficient, lower-loss units during routine utility maintenance of power distribution systems. Maintenance is typically not performed on units in service. However, units removed from service with appreciable remaining life are often refurbished and returned to stock. Distribution transformers may be removed from service for many reasons, including failure, over- or underloading, or line upgrades such as voltage changes or rerouting. When distribution transformers are removed from service, a decision must be made whether to dispose of the transformer and purchase a lower-loss replacement or to refurbish the transformer and return it to stock for future use. This report contains findings and recommendations on replacing utility distribution transformers during routine maintenance, which is required by section 124(c) of the Energy Policy Act of 1992. The objectives of the study are to evaluate the practicability, cost-effectiveness, and potential energy savings of replacing or upgrading existing transformers during routine utility maintenance and to develop recommendations on was to achieve the potential energy savings.

Barnes, P.R.; Van Dyke, J.W.; McConnell, B.W.; Cohn, S.M.; Purucker, S.L.

1995-04-01T23:59:59.000Z

340

Integrated spare parts logistics and operations planning for maintenance service providers  

Science Journals Connector (OSTI)

Abstract This paper considers the problem of coordinated spare-part logistics and operations planning for third-party maintenance providers. Due to the multi-indenture structure of the equipment, different types of components might randomly fail to perform at different points of time. The spare part logistics literature has been focused on spare part inventory management in an in-house maintenance context. In this article, a mathematical programming model is first developed to formulate the problem in the context of a third-party maintenance provider who is faced with strict due dates for the delivery of repaired equipment. The model seeks the optimal number of maintenance jobs that can be completed to deliver at each period, as well as the order quantity of spare parts so as to minimize the procurement, inventory, and equipment late delivery costs, while taking into account the spare part supply lead-time. Next, we model the spare part demand uncertainty as a non-stationary stochastic process in each period in the planning horizon. The deterministic model is then reformulated as a multi-stage stochastic program with recourse. We also discuss the complexity of the stochastic model and propose a preprocessing approach to reduce its size for large instances. Numerical results demonstrate how the proposed model links the spare part logistics and equipment delivery decisions under spare part demand uncertainty.

Masoumeh Kazemi Zanjani; Mustapha Nourelfath

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "increased maintenance costs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Maintenance Management Program for DOE Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of Structures, Systems and Components (SSCs) that are part of the safety basis required by 10 CFR 830.202.1 at hazard category 1, 2 and 3 Department of Energy (DOE) nuclear facilities. Cancels DOE O 433.1. Canceled by DOE O 433.1B.

2007-02-13T23:59:59.000Z

342

Machine Maintenance Integrated Performance Support System  

SciTech Connect (OSTI)

The objectives of this partnership project were to develop a preventive maintenance checklist program, a troubleshooting system for the Vertical Turning Center (VTC)-5, an on-line manual, and to integrate these components with a custom browser that would run on the VTC-5 machine's controller and would support future internet/intranet delivery. Kingsbury provided subject matter experts from engineering, manufacturing, and technical support. They also provided photographs, schematics, and CAD drawings, which AlliedSignal Federal Manufacturing and Technologies (ASFM and T) digitized for use in the final program. Information from The Kingsbury troubleshooting experts were interviewed regarding symptoms and root causes of system malfunctions This knowledge was captured and from it, fault trees were developed. These trees were then incorporated into the EPSS as a troubleshooting tool. The troubleshooting portion of the system presents simple questions to the machine operator in order to determine the likely cause or causes of malfunctions and then recommends systematic corrective actions. The on-line reference manual, covering operations and maintenance, provides text and illustrations to the machine operator in a traditional structure, but additionally offers the capability to search voluminous amounts of technical data and retrieve specific information on request. The maintenance portion of the EPSS includes checklists that are displayed daily, weekly, monthly, and annually, as appropriate, on the VTC-5 controller screen. The controller software is unavailable for machining parts until the machine tool operator goes through and checks off all of the checklist items. This project provided the team with a detailed understanding of the knowledge and information required to produce and support advanced machine tools. In addition, it resulted in the design and construction of a prototype VTC-5 EPSS containing all the logic and interfaces necessary to integrate operations and maintenance information from other Kingsbury machine tools.

Bohley, M.C.; Schwartz, M.E.

1998-03-11T23:59:59.000Z

343

Maintenance Management Program for DOE Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Admin Chg 1, dated 3-12-2013. Cancels DOE O 433.1A.

2010-04-21T23:59:59.000Z

344

Maintenance Management Program for DOE Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Cancels DOE O 433.1A. Admin Chg 1, dated 3-12-2013, cancels DOE O 433.1B.

2010-04-21T23:59:59.000Z

345

Software Maintenance and Evolution: Keith Bennett & Vaclav Rajlich  

E-Print Network [OSTI]

for change and improvements. Our aim is to describe a landscape for research in software maintenanceSoftware Maintenance and Evolution: A Roadmap Keith Bennett & Vaclav Rajlich Key Research Pointers transformation techniques. He is a founding co-Director of the Centre for Software Maintenance at Durham

346

Maintenance Approaches For ARIES-CS Power Core  

E-Print Network [OSTI]

of Fusion Energy September 14-16, 2004 Madison, WI #12;2 Outline Introduction Reactor parameters Maintenance approach based on field-period units Modular maintenance approach through selected ports Maintenance approach with ports between all the modular coils Summary and conclusion #12;3 Introduction The engineering

347

Kalispell Maintenance Headquarters Project : Environmental Assessment.  

SciTech Connect (OSTI)

The facilities needed to maintain and repair Bonneville Power Administration (BPA's) electrical equipment in northwest Montana are currently in two locations: A maintenance headquarters at the Kalispell Substation, and a temporary leased facility south of Kalispell. The present situation is not efficient. There is not enough space to accommodate the equipment needed at each site, and coordination and communication between the two sites is difficult. Also, two sites means duplication of equipment and facilities. BPA needs a single, centralized facility that would efficiently accommodate all the area's maintenance activities and equipment. BPA proposes to build a maintenance headquarters facility consisting of 2 to 4 single-story buildings totaling about 35,000 square feet (office spaces and workshop areas); an open-ended vehicle storage building (carport style); a fenced-in storage year; a storage building for flammables, herbicides, and hazardous wastes; and a parking lot. The facility would require developing about 6 to 10 acres of land. Two sites are being considered for the proposed project (see the attached map for locations). This report is the environmental assessment of the two options.

United States. Bonneville Power Administration.

1991-01-01T23:59:59.000Z

348

Hydrogen Threshold Cost Calculation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Program Record (Offices of Fuel Cell Technologies) Program Record (Offices of Fuel Cell Technologies) Record #: 11007 Date: March 25, 2011 Title: Hydrogen Threshold Cost Calculation Originator: Mark Ruth & Fred Joseck Approved by: Sunita Satyapal Date: March 24, 2011 Description: The hydrogen threshold cost is defined as the hydrogen cost in the range of $2.00-$4.00/gge (2007$) which represents the cost at which hydrogen fuel cell electric vehicles (FCEVs) are projected to become competitive on a cost per mile basis with the competing vehicles [gasoline in hybrid-electric vehicles (HEVs)] in 2020. This record documents the methodology and assumptions used to calculate that threshold cost. Principles: The cost threshold analysis is a "top-down" analysis of the cost at which hydrogen would be

349

Hydrogen Pathway Cost Distributions  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Pathway Cost Distributions Pathway Cost Distributions Jim Uihlein Fuel Pathways Integration Tech Team January 25, 2006 2 Outline * Pathway-Independent Cost Goal * Cost Distribution Objective * Overview * H2A Influence * Approach * Implementation * Results * Discussion Process * Summary 3 Hydrogen R&D Cost Goal * Goal is pathway independent * Developed through a well defined, transparent process * Consumer fueling costs are equivalent or less on a cents per mile basis * Evolved gasoline ICE and gasoline-electric hybrids are benchmarks * R&D guidance provided in two forms * Evolved gasoline ICE defines a threshold hydrogen cost used to screen or eliminate options which can't show ability to meet target * Gasoline-electric hybrid defines a lower hydrogen cost used to prioritize projects for resource allocation

350

Cost-Benefit Analysis  

Science Journals Connector (OSTI)

Acost-benefit analysis is an analytical procedure for determining the economic efficiency of intervention, expressed as the relationship between costs and outcomes, usually measured in monetary terms. In othe...

2008-01-01T23:59:59.000Z

351

Cost-Efficiency  

Science Journals Connector (OSTI)

Cost?efficiency is agoal that has been integrated by policy makers into all modern health care systems to control the expansion of costs over time. It relates to maximizing the quality of acomparable unit ...

2008-01-01T23:59:59.000Z

352

About Cost Center  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

from the university, fee-for-service contracts, as well as establishing CAMD as a cost center. We know that our users are reluctant to see CAMD become a cost center, however...

353

Costs of Electricity  

Science Journals Connector (OSTI)

A major reason for the decreased interest in the building of new nuclear power plants in recent years has been the relatively high cost of nuclear power. In this section, we will consider the role of costs in electricity

2005-01-01T23:59:59.000Z

354

Direct/Indirect Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter provides recommended categories for direct and indirect elements developed by the Committee for Cost Methods Development (CCMD) and describes various estimating techniques for direct and indirect costs.

1997-03-28T23:59:59.000Z

355

Cost Optimal Energy Performance  

Science Journals Connector (OSTI)

EPBD recast requires Member States (MS) to ensure that minimum energy performance requirements of buildings are set with a view to achieving cost optimal levels using a comparative methodology framework...1]. Cost

Jarek Kurnitski

2013-01-01T23:59:59.000Z

356

Cost Containment and Productivity  

E-Print Network [OSTI]

Cost Containment and Productivity Faculty Assembly Presentation January 22, 2013 Arthur G. Ramicone, CFO David N. DeJong, Vice Provost, Academic Planning and Resources Management #12;Cost Containment Resources to Enhance the Student Experience · Reduce the Cost and Complexity of Administrative Operations

Jiang, Huiqiang

357

Lunch & Learn Cost Sharing  

E-Print Network [OSTI]

Lunch & Learn Cost Sharing #12;Today's Agenda Policy Procedures OMNI Child Budget Setup Transactions in OMNI FACET Common Issues #12;Cost Sharing Policy http://www.research.fsu.edu/contractsgra nts ­ Not quantified ­ Do not have to account for and report #12;Cost Sharing Procedures http

McQuade, D. Tyler

358

NETL: Turbine Projects - Cost Reduction  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cost Reduction Cost Reduction Turbine Projects Cost Reduction Single Crystal Turbine Blades Enhancing Gas Turbine Efficiency Data/Fact Sheets Enabling and Information Technologies to Increase RAM of Advanced Powerplants Data/Fact Sheets Development of NDE Technology for Environmental Barrier Coating and Residual Life Estimation Data/Fact Sheets Welding and Weld Repair of Single Crystal Gas Turbine Alloy Data/Fact Sheets Combustion Turbine Hot Section Coating Life Management Data/Fact Sheets On-Line Thermal Barrier Coating Monitor for Real-Time Failure Protection and Life Maximization Data/Fact Sheets On-Line Thermal Barrier Coating [PDF] Advanced Monitoring to Improve Combustion Turbine/Combined Cycle RAM Data/Fact Sheets Advanced Monitoring to Improve Combustion Turbine [PDF]

359

Electrical energy storage systems: A comparative life cycle cost analysis  

Science Journals Connector (OSTI)

Abstract Large-scale deployment of intermittent renewable energy (namely wind energy and solar PV) may entail new challenges in power systems and more volatility in power prices in liberalized electricity markets. Energy storage can diminish this imbalance, relieving the grid congestion, and promoting distributed generation. The economic implications of grid-scale electrical energy storage technologies are however obscure for the experts, power grid operators, regulators, and power producers. A meticulous techno-economic or cost-benefit analysis of electricity storage systems requires consistent, updated cost data and a holistic cost analysis framework. To this end, this study critically examines the existing literature in the analysis of life cycle costs of utility-scale electricity storage systems, providing an updated database for the cost elements (capital costs, operational and maintenance costs, and replacement costs). Moreover, life cycle costs and levelized cost of electricity delivered by electrical energy storage is analyzed, employing Monte Carlo method to consider uncertainties. The examined energy storage technologies include pumped hydropower storage, compressed air energy storage (CAES), flywheel, electrochemical batteries (e.g. leadacid, NaS, Li-ion, and NiCd), flow batteries (e.g. vanadium-redox), superconducting magnetic energy storage, supercapacitors, and hydrogen energy storage (power to gas technologies). The results illustrate the economy of different storage systems for three main applications: bulk energy storage, T&D support services, and frequency regulation.

Behnam Zakeri; Sanna Syri

2015-01-01T23:59:59.000Z

360

Low-cost inertial measurement unit.  

SciTech Connect (OSTI)

Sandia National Laboratories performs many expensive tests using inertial measurement units (IMUs)--systems that use accelerometers, gyroscopes, and other sensors to measure flight dynamics in three dimensions. For the purpose of this report, the metrics used to evaluate an IMU are cost, size, performance, resolution, upgradeability and testing. The cost of a precision IMU is very high and can cost hundreds of thousands of dollars. Thus the goals and results of this project are as follows: (1) Examine the data flow in an IMU and determine a generic IMU design. (2) Discuss a high cost IMU implementation and its theoretically achievable results. (3) Discuss design modifications that would save money for suited applications. (4) Design and implement a low cost IMU and discuss its theoretically achievable results. (5) Test the low cost IMU and compare theoretical results with empirical results. (6) Construct a more streamlined printed circuit board design reducing noise, increasing capabilities, and constructing a self-contained unit. Using these results, we can compare a high cost IMU versus a low cost IMU using the metrics from above. Further, we can examine and suggest situations where a low cost IMU could be used instead of a high cost IMU for saving cost, size, or both.

Deyle, Travis Jay

2005-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "increased maintenance costs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

US nuclear power plant operating cost and experience summaries  

SciTech Connect (OSTI)

NUREG/CR-6577, U.S. Nuclear Power Plant Operating Cost and Experience Summaries, has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants. Cost incurred after initial construction are characterized as annual production costs, representing fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operating summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from annual operating reports submitted by the licensees, plant histories contained in Nuclear Power Experience, trade press articles, and the Nuclear Regulatory Commission (NRC) web site (www.nrc.gov).

Kohn, W.E.; Reid, R.L.; White, V.S.

1998-02-01T23:59:59.000Z

362

Cost Function Estimates  

Science Journals Connector (OSTI)

Abstract The cost function describes the cost-minimizing combinations of inputs required for production of different levels of output. Empirical cost function studies take both short-run and long-run approaches and can be structurally consistent with microeconomic theory versus more behavioral or real-world data oriented. Studies of health care providers face numerous challenges including the multiproduct nature of the firm, difficulty in controlling for quality of service, and frequent failure of the profit-maximization assumption. Cost function applications in health care are numerous and include such topics as optimal firm size, performance inefficiency measures, and comparisons of production costs with third-party payments.

K. Carey

2014-01-01T23:59:59.000Z

363

PREVENTIVE MAINTENANCE LEADS TO EARLY DETECTION AT WIPP SITE | Department  

Broader source: Energy.gov (indexed) [DOE]

PREVENTIVE MAINTENANCE LEADS TO EARLY DETECTION AT WIPP SITE PREVENTIVE MAINTENANCE LEADS TO EARLY DETECTION AT WIPP SITE PREVENTIVE MAINTENANCE LEADS TO EARLY DETECTION AT WIPP SITE September 1, 2011 - 12:00pm Addthis The new wire rope before installation. The new wire rope before installation. URS Washington TRU Solutions operations and maintenance crews demonstrate exceptional performance to replace a steel rope. URS Washington TRU Solutions operations and maintenance crews demonstrate exceptional performance to replace a steel rope. The new wire rope before installation. URS Washington TRU Solutions operations and maintenance crews demonstrate exceptional performance to replace a steel rope. Carlsbard, NM - The effectiveness of the Waste Isolation Pilot Plant's (WIPP) preventive maintenance program paid huge dividends late last month

364

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Chapter 5 Types of Maintenance Programs Chapter 5 Types of Maintenance Programs � 5.1 Introduction What is maintenance and why is it performed? Past and current maintenance practices in both the private and government sectors would imply that maintenance is the actions associated with equipment repair after it is broken. The dictionary defines maintenance as follows: "the work of keeping something in proper condition; upkeep." This would imply that maintenance should be actions taken to prevent a device or component from failing or to repair normal equipment degradation experienced with the operation of the device to keep it in proper working order. Unfortunately, data obtained in many studies over the past decade indicates that most private and government facilities do not expend the necessary resources to maintain equipment in proper working

365

Federal Energy Management Program: Operations and Maintenance for Major  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for Major Equipment Types to someone by E-mail for Major Equipment Types to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on Google Bookmark Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on Delicious Rank Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance

366

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: Energy.gov (indexed) [DOE]

Chapter 5 Types of Maintenance Programs Chapter 5 Types of Maintenance Programs � 5.1 Introduction What is maintenance and why is it performed? Past and current maintenance practices in both the private and government sectors would imply that maintenance is the actions associated with equipment repair after it is broken. The dictionary defines maintenance as follows: "the work of keeping something in proper condition; upkeep." This would imply that maintenance should be actions taken to prevent a device or component from failing or to repair normal equipment degradation experienced with the operation of the device to keep it in proper working order. Unfortunately, data obtained in many studies over the past decade indicates that most private and government facilities do not expend the necessary resources to maintain equipment in proper working

367

Cost effective lighting  

SciTech Connect (OSTI)

Long-life replacement lamps for the incandescent lamp have been evaluated with regard to their cost effectiveness. The replacements include the use of energy buttons that extend lamp life as well as an adaptive fluorescent circline lamp that will fit into existing incandescent lamp sockets. The initial, operating, and replacement costs for one million lumen-hours are determined for each lamp system. We find the most important lighting cost component is the operating cost. Using lamps that are less efficient or devices that cause lamps to operate less efficiently are not cost-effective. The adaptive fluorescent circline lamp, even at an initial cost of $15.00, is the most cost effective source of illumination compared to the incandescent lamp and lamp systems examined. 3 refs., 6 tabs.

Morse, O.; Verderber, R.

1987-07-01T23:59:59.000Z

368

Information erasure without an energy cost  

E-Print Network [OSTI]

Landauer argued that the process of erasing the information stored in a memory device incurs an energy cost in the form of a minimum amount of mechanical work. We find, however, that this energy cost can be reduced to zero by paying a cost in angular momentum or any other conserved quantity. Erasing the memory of Maxwell's demon in this way implies that work can be extracted from a single thermal reservoir at a cost of angular momentum and an increase in total entropy. The implications of this for the second law of thermodynamics are assessed.

Joan A. Vaccaro; Stephen M. Barnett

2010-04-29T23:59:59.000Z

369

23rd steam-station cost survey  

SciTech Connect (OSTI)

The results of the 23rd Steam Station Cost Survey covering the year 1982 are summarized. The major categories of the survey are as follows: general data; output data, 1982; fuel consumption, 1982; operation 1982 (mills/net kWh); investment ($/net kWh); energy cost, 1982 (mills/net kWh); and station performance, 1982. Thirty-one fossil-fuel steam plants and four nuclear stations were included in the survey. Fuel and operating cost increases are felt to be responsible for the moderate rise in total busbar-enery costs. 11 figures, 1 table.

Friedlander, G.D.; Going, M.C.

1983-11-01T23:59:59.000Z

370

Cost Model for Digital Curation: Cost of Digital Migration  

E-Print Network [OSTI]

Steece, B. 2000. Software cost estimation with COCOMO II.Developing a Framework of Cost Elements for PreservingAshley, K. 1999. Digital archive costs: Facts and fallacies.

Kejser, Ulla Bgvad; Nielsen, Anders Bo; Thirifays, Alex

2009-01-01T23:59:59.000Z

371

Energy cost and energy sources in karate  

Science Journals Connector (OSTI)

Energy costs and energy sources in karate (wado style) were...2max) 36.8 ml min?1 kg?1) performing six katas (formal, organized movement sequences) of increasing duration (from approximately. 10 s to approxim...

M. P. Francescato; T. Talon

1995-09-01T23:59:59.000Z

372

Evaporative Roof Cooling- A Simple Solution to Cut Cooling Costs  

E-Print Network [OSTI]

Since the Energy Crisis Evaporative Roof Cooling Systems have gained increased acceptance as a cost effective method to reduce the high cost of air conditioning. Documented case histories in retro-fit installations show direct energy savings...

Abernethy, D.

373

Analytic framework for TRL-based cost and schedule models  

E-Print Network [OSTI]

Many government agencies have adopted the Technology Readiness Level (TRL) scale to help improve technology development management under ever increasing cost, schedule, and complexity constraints. Many TRL-based cost and ...

El-Khoury, Bernard

2012-01-01T23:59:59.000Z

374

Measurements of pavement condition and estimation of maintenance and rehabilitation costs using statistical sampling techniques  

E-Print Network [OSTI]

- mators of a and b. To determine if the 100 percent sample does actually come from a beta d1stribut1on w1th parameters as spec1fied in Table 6, the Kolmo- gorov-Smi rnov goodness of fit test 1s used ( 15). In th1s procedure if sup I Sn(X) *(X) I K... To my parents and my husband, Richard, with all my love. ACKNOWLEDGENENTS I wish to express my most sincere thanks to Or. Alberto Garcia who served as Chai rman of my Committee for his patient guidance and assistance. I would also like to express...

Templeton, Connie Jill

2012-06-07T23:59:59.000Z

375

Reducing Network Costs Through Improved Vehicle Maintenance: A Lean Production Approach  

E-Print Network [OSTI]

or other marking device to identify cars with possible defects, and a lantern for inspecting trains was heavily dependant on the mental acuity, physical ability, and training of its car inspectors to more effectively detect railcar equipment defects. Over the past several decades, US Class I railroads

Illinois at Urbana-Champaign, University of

376

Energy content, storage substances, and construction and maintenance costs of Mediterranean deciduous leaves  

Science Journals Connector (OSTI)

At monthly intervals water content, crude fibre, total and protein nitrogen, sugars, starch, total lipids, ash content and calorific total energy were measured throughout the lifespan of the...Pistacia terebinthu...

S. Diamantoglou; S. Rhizopoulou; U. Kull

1989-12-01T23:59:59.000Z

377

Integrated Chiller System Reduce Building Operation and Maintenance Costs in Cold Climates  

E-Print Network [OSTI]

Although water-cooled chillers are more energy efficient than air-cooled chillers, a majority of chilled water systems use air-cooled chillers. In cold weather climates, air-cooled chillers are capable of functioning in low ambient temperatures...

Sheets, N.; Liu, M.

2003-01-01T23:59:59.000Z

378

Commercial equipment cost database  

SciTech Connect (OSTI)

This report, prepared for DOE, Office of Codes and Standards, as part of the Commercial Equipment Standards Program at Pacific Northwest Laboratory, specifically addresses the equipment cost estimates used to evaluate the economic impacts of revised standards. A database including commercial equipment list prices and estimated contractor costs was developed, and through statistical modeling, estimated contractor costs are related to equipment parameters including performance. These models are then used to evaluate cost estimates developed by the ASHRAE 90.1 Standing Standards Project Committee, which is in the process of developing a revised ASHRAE 90.1 standard. The database will also be used to support further evaluation of the manufacturer and consumer impacts of standards. Cost estimates developed from the database will serve as inputs to economic modeling tools, which will be used to estimate these impacts. Preliminary results suggest that list pricing is a suitable measure from which to estimate contractor costs for commercial equipment. Models developed from these cost estimates accurately predict estimated costs. The models also confirm the expected relationships between equipment characteristics and cost. Cost models were developed for gas-fired and electric water heaters, gas-fired packaged boilers, and warm air furnaces for indoor installation. Because of industry concerns about the use of the data, information was not available for the other categories of EPAct-covered equipment. These concerns must be addressed to extend the analysis to all EPAct equipment categories.

Freeman, S.L.

1995-01-01T23:59:59.000Z

379

Scheduling Flexible Maintenance Activities subject to Job ...  

E-Print Network [OSTI]

Apr 3, 2010 ... We consider a transition form state i to state j if and only if itransition costs ci,j are ...... Management Science, 15(1):102109, 1968.

2010-04-14T23:59:59.000Z

380

Maintenance Sheet for 2013 Chevrolet Volt  

Broader source: Energy.gov (indexed) [DOE]

0DU103929 Date Mileage Description Cost 342013 4,876 Replaced relay assembly, engine control module, and 12V battery - under warranty NC 342013 4,876 Reflashed parking brake...

Note: This page contains sample records for the topic "increased maintenance costs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Maintenance Sheet for 2011 Hyundai Sonata  

Broader source: Energy.gov (indexed) [DOE]

7BA003539 Date Mileage Description Cost 7192011 5,720 Changed oil and filter 14.67 10122011 11,152 Changed oil and filter and rotated tires 60.49 10212011 12,342 Upgraded...

382

Brush Busters: How to Estimate Costs for Controlling Small Mesquite  

E-Print Network [OSTI]

rapidly as plant size increases. ? Costs can escalate rapidly if you apply leaf or stem sprays using excessive pressure or nozzles with large orifices. ? Labor is usually a major component of total cost with Brush Busters methods. Costs escalate rapidly... and Figure 2 estimates costs for the stem spray method). Each figure consists of three graphs. The upper graph shows the cost for the spray only. The center graph shows total cost for spray plus labor at $6 per hour. The bottom graph shows total cost...

Ueckert, Darrell; McGinty, Allan

1999-04-15T23:59:59.000Z

383

Methods | Transparent Cost Database  

Open Energy Info (EERE)

Methods Methods Disclaimer The data gathered here are for informational purposes only. Inclusion of a report in the database does not represent approval of the estimates by DOE or NREL. Levelized cost calculations DO NOT represent real world market conditions. The calculation uses a single discount rate in order to compare technology costs only. About the Cost Database For emerging energy technologies, a variety of cost and performance numbers are cited in presentations and reports for present-day characteristics and potential improvements. Amid a variety of sources and methods for these data, the Office of Energy Efficiency and Renewable Energy's technology development programs determine estimates for use in program planning. The Transparent Cost Database collects program cost and performance

384

LMFBR fuel component costs  

SciTech Connect (OSTI)

A significant portion of the cost of fabricating LMFBR fuels is in the non-fuel components such as fuel pin cladding, fuel assembly ducts and end fittings. The contribution of these to fuel fabrication costs, based on FFTF experience and extrapolated to large LMFBR fuel loadings, is discussed. The extrapolation considers the expected effects of LMFBR development programs in progress on non-fuel component costs.

Epperson, E.M.; Borisch, R.R.; Rice, L.H.

1981-10-29T23:59:59.000Z

385

Petroleum well costs.  

E-Print Network [OSTI]

??This is the first academic study of well costs and drilling times for Australia??s petroleum producing basins, both onshore and offshore. I analyse a substantial (more)

Leamon, Gregory Robert

2006-01-01T23:59:59.000Z

386

Early Station Costs Questionnaire  

Broader source: Energy.gov (indexed) [DOE]

of refueling infrastructure costs National Renewable Energy Laboratory Innovation for Our Energy Future Questions for Market Readiness Workshop Attendees * Are these questions the...

387

''When Cost Measures Contradict''  

SciTech Connect (OSTI)

When regulators put forward new economic or regulatory policies, there is a need to compare the costs and benefits of these new policies to existing policies and other alternatives to determine which policy is most cost-effective. For command and control policies, it is quite difficult to compute costs, but for more market-based policies, economists have had a great deal of success employing general equilibrium models to assess a policy's costs. Not all cost measures, however, arrive at the same ranking. Furthermore, cost measures can produce contradictory results for a specific policy. These problems make it difficult for a policy-maker to determine the best policy. For a cost measures to be of value, one would like to be confident of two things. First one wants to be sure whether the policy is a winner or loser. Second, one wants to be confident that a measure produces the correct policy ranking. That is, one wants to have confidence in a policy measure's ability to correctly rank policies from most beneficial to most harmful. This paper analyzes empirically these two properties of different costs measures as they pertain to assessing the costs of the carbon abatement policies, especially the Kyoto Protocol, under alternative assumptions about implementation.

Montgomery, W. D.; Smith, A. E.; Biggar, S. L.; Bernstein, P. M.

2003-05-09T23:59:59.000Z

388

Low Cost, Durable Seal  

Broader source: Energy.gov [DOE]

This presentation, which focuses on low cost, durable seals, was given by George Roberts of UTC Power at a February 2007 meeting on new fuel cell projects.

389

Avoidable waste management costs  

SciTech Connect (OSTI)

This report describes the activity based costing method used to acquire variable (volume dependent or avoidable) waste management cost data for routine operations at Department of Energy (DOE) facilities. Waste volumes from environmental restoration, facility stabilization activities, and legacy waste were specifically excluded from this effort. A core team consisting of Idaho National Engineering Laboratory, Los Alamos National Laboratory, Rocky Flats Environmental Technology Site, and Oak Ridge Reservation developed and piloted the methodology, which can be used to determine avoidable waste management costs. The method developed to gather information was based on activity based costing, which is a common industrial engineering technique. Sites submitted separate flow diagrams that showed the progression of work from activity to activity for each waste type or treatability group. Each activity on a flow diagram was described in a narrative, which detailed the scope of the activity. Labor and material costs based on a unit quantity of waste being processed were then summed to generate a total cost for that flow diagram. Cross-complex values were calculated by determining a weighted average for each waste type or treatability group based on the volume generated. This study will provide DOE and contractors with a better understanding of waste management processes and their associated costs. Other potential benefits include providing cost data for sites to perform consistent cost/benefit analysis of waste minimization and pollution prevention (WMIN/PP) options identified during pollution prevention opportunity assessments and providing a means for prioritizing and allocating limited resources for WMIN/PP.

Hsu, K.; Burns, M.; Priebe, S.; Robinson, P.

1995-01-01T23:59:59.000Z

390

TRUPACT-II Operating and Maintenance Instructions  

SciTech Connect (OSTI)

The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II) Shipping Package and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP) and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9218. In the event there is a conflict between this document and the TRUPACT-II SARP, the TRUPACT-II SARP shall govern. TRUPACT-II C of C number 9218 states, ''... each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' It further states, ''... each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the application.'' Chapter 9 of the TRUPACT-II SARP charges the Westinghouse Electric Corporation Waste Isolation Division (WID) with assuring that the TRUPACT-II is used in accordance with the requirements of the C of C. To meet this requirement and verify consistency of operations when loading and unloading the TRUPACT-II on the trailer, placing a payload in the packaging, unloading the payload from the packaging, or performing maintenance, the U.S. Department of Energy Carlsbad Area Office (U.S. DOE/CAO) finds it necessary to implement the changes that follow. This TRUPACT-II maintenance document represents a change to previous philosophy regarding site specific procedures for the use of the TRUPACT-II. This document details the instructions to be followed to consistently operate and maintain the TRUPACT-II. The intent of these instructions is to ensure that all users of the TRUPACT-II follow the same or equivalent instructions. Users may achieve this intent by any of the following methods: (1) Utilizing these instructions as is, or (2) Attaching a site-specific cover page/letter to this document stating that these are the instructions to be used at their location, or (3) Sites may prepare their own document using the steps in this document word-for-word, in-sequence, including Notes and Cautions. Site specific information may be included as deemed necessary. Submit the document to WID National TRU Programs for approval. Any revision made subsequent to WID TRU Program's approval shall be reviewed and approved by WID TRU Programs. A copy of the approval letter from WID National TRU Programs should be available for audit purposes. Users shall develop site-specific procedures addressing leak testing, preoperational activities, quality assurance, hoisting and rigging, and radiation health physics to be used in conjunction with the instructions contained in this document. Users desiring to recommend changes to this document may submit their recommendations to the WID National TRU Programs for evaluation. If approved, the change(s) will be incorporated into this document for use by all TRUPACT-II users. User sites will be audited to this document to ensure compliance within one year from the effective date of this revision. This document discusses operating instructions, required inspections and maintenance for the following: TRUPACT-II packaging, and Miscellaneous packaging, special tools, and equipment. Packaging and payload handling equipment and transport trailers have been specifically designed for use with the TRUPACT-II Packaging. This document discusses the required instructions for use of the following equipment in conjunction with the TRUPACT-II Packaging: TRUPACT-II Mobile Loading Unit (MLU), Adjustable Center-of-Gravity Lift Fixture (ACGLF), and TRUPACT-II Transport Trailer. Attachment E contains the various TRUPACT-II packaging interface control drawings, leak-test and vent-port tool drawings, ACGLF drawings, and tie-down drawings that identify the various system components.

Westinghouse Electric Corporation, Waste Isolation Division

1999-12-31T23:59:59.000Z

391

Energy Efficiency Improvement and Cost Saving Opportunities for the Fruit and Vegetable Processing Industry. An ENERGY STAR Guide for Energy and Plant Managers  

E-Print Network [OSTI]

features a fuel mixer to blend vegetable oil with marine gasa 70:30 fuel ratio of spent vegetable oil and marine gas oilfuel and maintenance costs that were 50% less than a co-generation system running on marine

Masanet, Eric

2008-01-01T23:59:59.000Z

392

Cost Estimating and Cost Management Capacity Building Workshop  

E-Print Network [OSTI]

Cost Estimating and Cost Management Capacity Building Workshop August 11-13, 2010 Coffman Memorial 574 guidebook on cost estimating and cost management · To learn how states are moving forward with the implementation of the guidebook or other initiatives related to cost estimating and cost management · To share

Minnesota, University of

393

SunShot Initiative: Reducing Non-Hardware Costs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Reducing Non-Hardware Costs Reducing Non-Hardware Costs DOE supports efforts to dramatically reduce the non-hardware, balance of systems costs associated with solar energy systems. Representing as much as 64% of the total installed system price, these "soft costs" include: Customer Acquisition Financing and Contracting Permitting, Interconnection, and Inspection Installation and Performance Operations and Maintenance. To meet SunShot goals, the industry must innovate new ways to automate and speed processes that make it easier for consumers, businesses, utilities, solar companies, and others to install solar projects. For example, novel software solutions now allow solar companies to design systems and provide accurate quotes using satellite images rather than conducting full site visits.

394

Steam driven centrifugal pump for low cost boiler feed service  

SciTech Connect (OSTI)

This article describes a steam driven centrifugal pump for boiler feed-water and other high pressure water applications, which was awarded Top Honors in the special pumps category of the 1982 Chemical processing Vaaler competition, because the simple design with turbine, pump and controls combined in an integral unit provides high operating efficiency and reliable performance with minimal maintenance. Single source responsibility for all components when the pump may have to be serviced is another advantage. These features meet the requirements for boiler feed pumps that are critical to maintaining a consistent steam supply in a process plant where downtime can be extremely expensive. The annual cost to operate the pump for 8000 hours is about $100,000, if electricity costs 5 cents/kwh. These pumps can be run for about $30,000 on steam, if natural gas costs $4.00/mcf. Cost savings are $70,000 annually.

Not Available

1982-11-01T23:59:59.000Z

395

Reducing biosolids disposal costs using land application in forested areas  

SciTech Connect (OSTI)

Switching biosolids land application from a reclamation site to a forested site significantly reduced the cost of biosolids disposal at the Savannah River Site. Previous beneficial reuse programs focused on reclamation of existing borrow pits. While extremely beneficial, this program became very costly due to the regulatory requirements for groundwater monitoring, soil monitoring and frequent biosolids analyses. A new program was developed to reuse biosolids in forested areas where the biosolids could be used as a soil conditioner and fertilizer to enhance timber yield. The forested land application site was designed so that groundwater monitoring and soil monitoring could be eliminated while biosolids monitoring and site maintenance were minimized. Monitoring costs alone were reduced by 80%. Capital costs for site preparation were also significantly reduced since there was no longer a need for expensive groundwater monitoring wells.

Huffines, R.L.

1995-11-01T23:59:59.000Z

396

Simple Modular LED Cost Model  

Broader source: Energy.gov [DOE]

The LED Cost Model, developed by the DOE Cost Modeling Working Group, provides a simplified method for analyzing the manufacturing costs of an LED package. The model focuses on the major cost...

397

MAINTENANCE Assessment Plan, NNSA/Nevada Site Office Facility  

Broader source: Energy.gov (indexed) [DOE]

MAINTENANCE Assessment Plan, NNSA/Nevada Site Office Facility MAINTENANCE Assessment Plan, NNSA/Nevada Site Office Facility Representative Division MAINTENANCE Assessment Plan, NNSA/Nevada Site Office Facility Representative Division An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations. The program, facility or operation has a Maintenance Implementation Plan (MIP), or equivalent document, which defines and documents the approach to conduct of maintenance .Employees shall be encouraged to become involved in the identification and control of hazards in the workplace. (DOE O 440.1A CRD) Workers shall have the right, without reprisal, to accompany DOE worker

398

Costing climate change  

Science Journals Connector (OSTI)

...Costenergy analyses of such schemes...and tidal power at costs...consider in economic analyses of GHG abatement...pertaining to wind power in Denmark...In a cost analysis of implementing...Cutting coal combustion...large an economic burden...

2002-01-01T23:59:59.000Z

400

Technical information report: Plasma melter operation, reliability, and maintenance analysis  

SciTech Connect (OSTI)

This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences.

Hendrickson, D.W. [ed.

1995-03-14T23:59:59.000Z

Note: This page contains sample records for the topic "increased maintenance costs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Los Alamos Site Office Nuclear Maintenance Management Program...  

Office of Environmental Management (EM)

and Emergency Management Evaluations Activity Report for the Los Alamos Site Office Nuclear Maintenance Management Program Oversight Self-Assessment Dates of Activity : 1114...

402

Overview of the Second Quarter 2011 Surveillance and Maintenance...  

Office of Legacy Management (LM)

Maintenance and optimization of pilot air stripper No freezing observed Reduced solar availability reduced power available, causing pump to stop Resolved power issues...

403

Y-12 demos former utilities and maintenance facility | National...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

demos former utilities and maintenance facility | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing...

404

ANNUAL MAINTENANCE AND LEAK TESTING FOR THE 9975 SHIPPING PACKAGE  

SciTech Connect (OSTI)

The purpose of this document is to provide step-by-step instructions for the annual helium leak test certification and maintenance of the 9975 Shipping Package.

Trapp, D.

2014-08-25T23:59:59.000Z

405

Desalting seawater and brackish waters: 1981 cost update  

SciTech Connect (OSTI)

This is the fourth in a series of desalting cost update reports. Cost data are reported for desalting seawater by various distillation systems and by reverse osmosis. Costs of desalting four brackish waters, representative of those found in the United States by both reverse osmosis and electrodialysis are also given. Cost data are presented parametrically as a function of energy cost and plant size. The cost of desalting seawater by distillation has increased by 40% during the past two years, while desalting by reverse osmosis has increased by about 36% during the same period. Brackish water desalting by reverse osmosis has only increased by about 12%, and brackish water desalting by electrodialysis is up by 40%. Again, the continued increase in energy costs has had a major impact on all desalination systems.

Reed, S.A.

1982-08-01T23:59:59.000Z

406

An Examination of Avoided Costs in Utah  

E-Print Network [OSTI]

existing avoided cost methodology and established thefor certain avoided cost methodologies or avoided cost inpu

Bolinger, Mark; Wiser, Ryan

2005-01-01T23:59:59.000Z

407

Transmission line capital costs  

SciTech Connect (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

408

Decommissioning Unit Cost Data  

SciTech Connect (OSTI)

The Rocky Flats Closure Site (Site) is in the process of stabilizing residual nuclear materials, decommissioning nuclear facilities, and remediating environmental media. A number of contaminated facilities have been decommissioned, including one building, Building 779, that contained gloveboxes used for plutonium process development but did little actual plutonium processing. The actual costs incurred to decommission this facility formed much of the basis or standards used to estimate the decommissioning of the remaining plutonium-processing buildings. Recent decommissioning activities in the first actual production facility, Building 771, implemented a number of process and procedural improvements. These include methods for handling plutonium contaminated equipment, including size reduction, decontamination, and waste packaging, as well as management improvements to streamline planning and work control. These improvements resulted in a safer working environment and reduced project cost, as demonstrated in the overall project efficiency. The topic of this paper is the analysis of how this improved efficiency is reflected in recent unit costs for activities specific to the decommissioning of plutonium facilities. This analysis will allow the Site to quantify the impacts on future Rocky Flats decommissioning activities, and to develop data for planning and cost estimating the decommissioning of future facilities. The paper discusses the methods used to collect and arrange the project data from the individual work areas within Building 771. Regression and data correlation techniques were used to quantify values for different types of decommissioning activities. The discussion includes the approach to identify and allocate overall project support, waste management, and Site support costs based on the overall Site and project costs to provide a ''burdened'' unit cost. The paper ultimately provides a unit cost basis that can be used to support cost estimates for decommissioning at other facilities with similar equipment and labor costs. It also provides techniques for extracting information from limited data using extrapolation and interpolation techniques.

Sanford, P. C.; Stevens, J. L.; Brandt, R.

2002-02-26T23:59:59.000Z

409

Functional thinking in cost estimation through the tools and concepts of axiomatic design  

E-Print Network [OSTI]

There has been an increasing demand for cost estimation tools which aid in the reduction of system cost or the active consideration of cost as a design constraint. The existing tools are currently incapable of anticipating ...

Odhner, Lael Ulam, 1980-

2004-01-01T23:59:59.000Z

410

The Costs and Benefits of Compliance with Renewable Portfolio Standards: Reviewing Experience to Date  

E-Print Network [OSTI]

of the 9.2 /kWh retail electricity cost in 2012 across theof total retail electricity costs. Again, comparabilityprojected increase in electricity costs to meet a 33% RPS in

Heeter, Jenny

2014-01-01T23:59:59.000Z

411

Cost of Genetic Counseling and Testing for BRCA1 and BRCA2 Breast Cancer Susceptibility Mutations  

Science Journals Connector (OSTI)

...news News in Depth Seeking Value as Cancer Drug Costs Soar As significant increases in the costs of cancer drugs cause financial difficulties...Oncologists and their patients look closer at the cost-effectiveness of expensive therapies As the...

William F. Lawrence; Beth N. Peshkin; Wenchi Liang; Claudine Isaacs; Caryn Lerman; Jeanne S. Mandelblatt

2001-05-01T23:59:59.000Z

412

Pacific Northwest National Laboratory Grounds Maintenance  

Broader source: Energy.gov (indexed) [DOE]

Pacific Pacific Northwest National Laboratory (PNNL) operates an award-winning grounds maintenance program that comprises a comprehensive landscape and irrigation management program. The program has helped the laboratory reduce its water use for irrigation by 30%. PNNL is located in Richland, Washington, and is managed and operated by Battelle for the U.S. Department of Energy (DOE). PNNL scientists and engineers perform research on a variety of subjects, including energy and national security. PNNL has more than 4,200 staff members, sits on 600 acres, and houses 2 million square feet of facilities. The laboratory is located in an arid region of the state, receiving only eight inches of precipitation annually. It has more than 100 acres of turf and landscaped areas and

413

Economic Analysis on Direct Use of Spent Pressurized Water Reactor Fuel in CANDU Reactors - I: DUPIC Fuel Fabrication Cost  

SciTech Connect (OSTI)

A preliminary conceptual design of a Direct Use of spent Pressurized water reactor (PWR) fuel In Canada deuterium uranium (CANDU) reactors (DUPIC) fuel fabrication plant was studied, which annually converts spent PWR fuel of 400 tonnes heavy element (HE) into CANDU fuel. The capital and operating costs were estimated from the viewpoint of conceptual design. Assuming that the annual discount rate is 5% during the construction (5 yr) and operation period (40 yr) and contingency is 25% of the capital cost, the levelized unit cost (LUC) of DUPIC fuel fabrication was estimated to be 616 $/kg HE, which is mostly governed by annual operation and maintenance costs that correspond to 63% of LUC. Among the operation and maintenance cost components being considered, the waste disposal cost has the dominant effect on LUC ({approx}49%). From sensitivity analyses of production capacity, discount rate, and contingency, it was found that the production capacity of the plant is the major parameter that affects the LUC.

Choi, Hangbok; Ko, Won Il; Yang, Myung Seung [Korea Atomic Energy Research Institute (Korea, Republic of)

2001-05-15T23:59:59.000Z

414

Future Impacts of Coal Distribution Constraints on Coal Cost  

E-Print Network [OSTI]

transportation component of coal price should also increase;investment. Coal costs and prices are functions of a numberto forecast coal demand, supply, and prices from now to

McCollum, David L

2007-01-01T23:59:59.000Z

415

Aquifer thermal energy storage costs with a seasonal heat source.  

SciTech Connect (OSTI)

The cost of energy supplied by an aquifer thermal energy storage (ATES) system from a seasonal heat source was investigated. This investigation considers only the storage of energy from a seasonal heat source. Cost estimates are based upon the assumption that all of the energy is stored in the aquifer before delivery to the end user. Costs were estimated for point demand, residential development, and multidistrict city ATES systems using the computer code AQUASTOR which was developed specifically for the economic analysis of ATES systems. In this analysis the cost effect of varying a wide range of technical and economic parameters was examined. Those parameters exhibiting a substantial influence on ATES costs were: cost of purchased thermal energy; cost of capital; source temperature; system size; transmission distance; and aquifer efficiency. ATES-delivered energy costs are compared with the costs of hot water heated by using electric power or fuel-oils. ATES costs are shown as a function of purchased thermal energy. Both the potentially low delivered energy costs available from an ATES system and its strong cost dependence on the cost of purchased thermal energy are shown. Cost components for point demand and multi-district city ATES systems are shown. Capital and thermal energy costs dominate. Capital costs, as a percentage of total costs, increase for the multi-district city due to the addition of a large distribution system. The proportion of total cost attributable to thermal energy would change dramatically if the cost of purchased thermal energy were varied. It is concluded that ATES-delivered energy can be cost competitive with conventional energy sources under a number of economic and technical conditions. This investigation reports the cost of ATES under a wide range of assumptions concerning parameters important to ATES economics. (LCL)

Reilly, R.W.; Brown, D.R.; Huber, H.D.

1981-12-01T23:59:59.000Z

416

Lookin g for data personnel costs, indirect costs, equipment costs  

Broader source: Energy.gov (indexed) [DOE]

Negotiating Group Question/Answer Sessions November 19, 2009 Q: What happens now? A: The negotiation process starts tomorrow [November 20, 2009], when DOE will be sending the Awardees an e-mail with information about which website to go to for clarification and direction, information from the Office of Civil Rights, and answers to some of the questions that came up in the meeting. DOE will be gathering information about the questions concerning cyber requirements, metrics, and reporting requirements and will be getting back to the awardees about those issues the week after Thanksgiving. We have done a review of the budgets, and emails will be sent giving opportunities to address any issues. We will also re-review technical and cost proposals.

417

Design criteria document, Maintenance Shop/Support Facility, K-Basin Essential Systems Recovery, Project W-405  

SciTech Connect (OSTI)

During the next 10 years a substantial amount of work is scheduled in the K-Basin Area related to the storage and eventual removal of irradiated N-Reactor fuel. Currently, maintenance support activities are housed in existing structures that were constructed in the early 1950`s. These forty-year-old facilities and their supporting services are substandard, leading to inefficiencies. Because of numerous identified deficiencies and the planned increase in the numbers of K-Basin maintenance personnel, adequate maintenance support facilities that allow efficient operations are needed. The objective of this sub-project of Project W-405 is to provide a maintenance and storage facility which meets the K-Basin Maintenance Organization requirements as defined in Attachment 1. In Reference A, existing guidelines and requirements were used to allocate space for the maintenance activities and to provide a layout concept (See Attachment 2). The design solution includes modifying the existing 190 K-E building to provide space for shops, storage, and administration support functions. The primary reason for the modification is to simplify siting/permitting and make use of existing infrastructure. In addition, benefits relative to design loads will be realized by having the structure inside 190K-E. The new facility will meet the Maintenance Organization approved requirements in Attachment 1 relating to maintenance activities, storage areas, and personnel support services. This sub-project will also resolve outstanding findings and/or deficiencies relating to building fire protection, HVAC requirements, lighting replacement/upgrades, and personnel facilities. Compliance with building codes, local labor agreements and safety standards will result.

Strehlow, M.W.B.

1994-12-14T23:59:59.000Z

418

Cost analysis of oil, gas, and geothermal well drilling  

Science Journals Connector (OSTI)

Abstract This paper evaluates current and historical drilling and completion costs of oil and gas wells and compares them with geothermal wells costs. As a starting point, we developed a new cost index for US onshore oil and gas wells based primarily on the API Joint Association Survey 19762009 data. This index describes year-to-year variations in drilling costs and allows one to express historical drilling expenditures in current year dollars. To distinguish from other cost indices we have labeled it the Cornell Energy Institute (CEI) Index. This index has nine sub-indices for different well depth intervals and has been corrected for yearly changes in drilling activity. The CEI index shows 70% higher increase in well cost between 2003 and 2008 compared to the commonly used Producer Price Index (PPI) for drilling oil and gas wells. Cost trends for various depths were found to be significantly different and explained in terms of variations of oil and gas prices, costs, and availability of major well components and services at particular locations. Multiple methods were evaluated to infer the cost-depth correlation for geothermal wells in current year dollars. In addition to analyzing reported costs of the most recently completed geothermal wells, we investigated the results of the predictive geothermal well cost model WellCost Lite. Moreover, a cost database of 146 historical geothermal wells has been assembled. The CEI index was initially used to normalize costs of these wells to current year dollars. A comparison of normalized costs of historical wells with recently drilled ones and WellCost Lite predictions shows that cost escalation rates of geothermal wells were considerably lower compared to hydrocarbon wells and that a cost index based on hydrocarbon wells is not applicable to geothermal well drilling. Besides evaluating the average well costs, this work examined economic improvements resulting from increased drilling experience. Learning curve effects related to drilling multiple similar wells within the same field were correlated.

Maciej Z. Lukawski; Brian J. Anderson; Chad Augustine; Louis E. Capuano Jr.; Koenraad F. Beckers; Bill Livesay; Jefferson W. Tester

2014-01-01T23:59:59.000Z

419

Keeping the Lights on While Cutting Costs.  

SciTech Connect (OSTI)

In 1992, the Bonneville Power Administration spent $361 million in capital on a system to transmit electricity. By 1998, it was spending about one-third that amount: $123 million. In 1992, BPA`s expenses for managing, operating and maintaining the transmission system ran $160 million. By 1998, BPA had cut expenses to $128 million. Maintenance costs alone were cut 28%. In 1992, management of the grid was split into six organizations. Today, there is one. About 2,900 people worked for transmission in October 1992. By February 1998, the Transmission Business Line (TBL) employed 1,855. Transmission in 1992 for the most part meant new towers, lines and substations. Today it means computers, digital communications and electronic controls.

United States. Bonneville Power Administration.

1998-08-01T23:59:59.000Z

420

Modeling Web Maintenance Centers Through Queue Models M. Di Penta  

E-Print Network [OSTI]

Modeling Web Maintenance Centers Through Queue Models M. Di Penta , G. Casazza ¡ , G. Antoniol´eal Abstract The Internet and WEB pervasiveness are changing the landscape of several different areas ranging from infor- mation gathering/managing and commerce to software development, maintenance and evolution

Di Penta, Massimiliano

Note: This page contains sample records for the topic "increased maintenance costs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Printing Your Monthly PTA Maintenance Screen Shannon Monahan Page 1  

E-Print Network [OSTI]

Printing Your Monthly PTA Maintenance Screen Shannon Monahan Page 1 Office of Postdoctoral Maintenance Screen. All starting points begin before the popup menu comes up. In Internet Explorer the Orientation to Landscape, and click OK. Print as needed to either your printer or to Adobe PDF (only works

Kay, Mark A.

422

`ODDS ALGORITHM'-BASED OPPORTUNISTIC MAINTENANCE FOR PRESERVING COMPONENT PERFORMANCES  

E-Print Network [OSTI]

into account a `lifecycle management'-oriented approach (Takata, et al., 2004). Indeed, limits on resources, at the manufacturing stage, an innovative culture wherein maintenance activities become of equal importance to actual planning and the production strategy planning to develop opportunistic maintenance tasks guaranteeing

Boyer, Edmond

423

Heavy Machine Failure Maintenance Stratege Study Based on FMEA  

Science Journals Connector (OSTI)

Heavy machine is mainly used for large-scale, large parts of the processing, is the country's headed guard equipment. Heavy machine's non-normal shutdown will result in significant damage to the enterprise, how to effectively improve the maintenance ... Keywords: Heavy machine, FMEA, Maintenance Strategy

Deng Chao; Xiong Yao; Yuan-hang Wang; Wu Jun

2010-06-01T23:59:59.000Z

424

Reliability-Based Prioritizing Maintenance Policy for Distribution System  

Science Journals Connector (OSTI)

This paper presents an approach to prioritize maintenance tasks in power distribution system based on reliability models. This approach define weighted average system reliability index WASRI employing reliability indices SAIFI, SAIDI, MAIFI and interruption ... Keywords: Maintenance management, distribution reliability, reliability indices

Zhang Yong; Sun Xiaorong; Chen Hao; Fangxing Li

2010-06-01T23:59:59.000Z

425

cost | OpenEI  

Open Energy Info (EERE)

cost cost Dataset Summary Description The following data-set is for a benchmark residential home for all TMY3 locations across all utilities in the US. The data is indexed by utility service provider which is described by its "unique" EIA ID ( Source National Renewable Energy Laboratory Date Released April 05th, 2012 (2 years ago) Date Updated April 06th, 2012 (2 years ago) Keywords AC apartment CFL coffeemaker Computer cooling cost demand Dishwasher Dryer Furnace gas HVAC Incandescent Laptop load Microwave model NREL Residential television tmy3 URDB Data text/csv icon Residential Cost Data for Common Household Items (csv, 14.5 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Annually Time Period License License Open Data Commons Public Domain Dedication and Licence (PDDL)

426

Estimating Renewable Energy Costs  

Broader source: Energy.gov [DOE]

Some renewable energy measures, such as daylighting, passive solar heating, and cooling load avoidance, do not add much to the cost of a building. However, renewable energy technologies typically...

427

Cost Effective Sustainable Housing.  

E-Print Network [OSTI]

??Cost Effective Sustainable Housing The topic of research which was discussed throughout this study was an analysis of sustainable development between single-family and multi-family structures. (more)

Morton, Joshua

2009-01-01T23:59:59.000Z

428

Cost Estimating Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides uniform guidance and best practices that describe the methods and procedures that could be used in all programs and projects at DOE for preparing cost estimates. No cancellations.

2011-05-09T23:59:59.000Z

429

Vehicle Cost Calculator  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Annual GHG Emissions (lbs of CO2) Vehicle Cost Calculator See Assumptions and Methodology Back Next U.S. Department of Energy Energy Efficiency and Renewable Energy Get Widget Code...

430

Costing climate change  

Science Journals Connector (OSTI)

...even whether man-made greenhouse-gas emissions should...and monetary savings from lighting policy calculated using `Work Energy Smart Lighting Calculator', assuming...reducing energy costs and greenhouse gases. Australian Greenhouse...

2002-01-01T23:59:59.000Z

431

Estimating environmental costs  

Science Journals Connector (OSTI)

Added demands on natural resources and proposed environmental regulations could potentially have a significant impact on the production and operational costs of information technology (IT). In this paper, we utilize an Economic Input-Output Life-Cycle ...

Kiara Corrigan; Amip Shah; Chandrakant Patel

2010-02-01T23:59:59.000Z

432

Performance and Costs of CO2 Capture at Gas Fired Power Plants  

Science Journals Connector (OSTI)

Abstract This paper summarises the results from a study that assesses the performance and costs of natural gas fired combined cycle power plants with CCS. Information is provided on the designs of each of the plants, their power output, efficiency, greenhouse gas intensity, capital costs, operating and maintenance costs, levelised costs of electricity and costs of CO2 avoidance. Discussion and commentary on the key findings and recommendations is also included. The paper includes information on base load plant performance and costs, but part load performance and costs of operation at low annual capacity factors are also presented because operation at lower load factors may be necessary, particularly in future electricity systems that include high amounts of other low-CO2 generation plants.

Neil Smith; Geoff Miller; Indran Aandi; Richard Gadsden; John Davison

2013-01-01T23:59:59.000Z

433

Cost Estimating Handbook for Environmental Restoration  

SciTech Connect (OSTI)

Environmental restoration (ER) projects have presented the DOE and cost estimators with a number of properties that are not comparable to the normal estimating climate within DOE. These properties include: An entirely new set of specialized expressions and terminology. A higher than normal exposure to cost and schedule risk, as compared to most other DOE projects, due to changing regulations, public involvement, resource shortages, and scope of work. A higher than normal percentage of indirect costs to the total estimated cost due primarily to record keeping, special training, liability, and indemnification. More than one estimate for a project, particularly in the assessment phase, in order to provide input into the evaluation of alternatives for the cleanup action. While some aspects of existing guidance for cost estimators will be applicable to environmental restoration projects, some components of the present guidelines will have to be modified to reflect the unique elements of these projects. The purpose of this Handbook is to assist cost estimators in the preparation of environmental restoration estimates for Environmental Restoration and Waste Management (EM) projects undertaken by DOE. The DOE has, in recent years, seen a significant increase in the number, size, and frequency of environmental restoration projects that must be costed by the various DOE offices. The coming years will show the EM program to be the largest non-weapons program undertaken by DOE. These projects create new and unique estimating requirements since historical cost and estimating precedents are meager at best. It is anticipated that this Handbook will enhance the quality of cost data within DOE in several ways by providing: The basis for accurate, consistent, and traceable baselines. Sound methodologies, guidelines, and estimating formats. Sources of cost data/databases and estimating tools and techniques available at DOE cost professionals.

NONE

1990-09-01T23:59:59.000Z

434

Standard costs for labor  

E-Print Network [OSTI]

STANDARD COSTS FOR LABOR A Thesis By MD. NURUL ABSAR KHAN Submitted to the Graduate School of the Agricultural and Mechanical College of Texms in partial fulfillment of the requirements for the degree of MASTER OF BUSINESS ADMINISTRATION... Administration and the government of East Pakistan. CONTENTS Chapter Page I. Introduction and Prelisd. nary Discussion II. Installation and Accounting Aspects of Standard Costs for Labor III, Recording~ Analysing and Reporting of Labor Vaxlances . 45 IV...

Khan, Mohammed Nurul Absar

2012-06-07T23:59:59.000Z

435

Operations and Maintenance Program Structure | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Operations and Maintenance Program Structure Operations and Maintenance Program Structure Operations and Maintenance Program Structure October 4, 2013 - 5:12pm Addthis The Federal Energy Management Program recommends Federal operations and maintenance (O&M) programs comprise of five distinct functions: operations, maintenance, engineering, training, and administration. This approach is commonly referred to as the OMETA principle. Common roles and responsibilities for each function within the OMETA principle are outlined below. Operations The operations function of the O&M program covers the following responsibilities: Administration: Responsible for ensuring effective implementation and control of O&M activities Conduct of Operations: Responsible for ensuring efficient, safe, and reliable process operations across the O&M program

436

Operations and Maintenance Best Practices Guide | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Operations and Maintenance Best Practices Guide Operations and Maintenance Best Practices Guide Operations and Maintenance Best Practices Guide October 7, 2013 - 9:56am Addthis The Federal Energy Management Program's Operations and Maintenance (O&M) Best Practices Guide outlines best practices to help Federal agencies implement effective O&M for systems and equipment found at their facilities. Following these best practices can help agencies gain management buy-in for O&M programs and save an estimated 5% to 20% on energy bills without a significant capital investment. Depending on the facility, these savings can represent thousands to hundreds-of-thousands of dollars each year. Read the Operations and Maintenance (O&M) Best Practices Guide: Release 3.0. See individual chapters: Front Matter

437

Protocol, Development and Maintenance of Criteria and Review Approach  

Broader source: Energy.gov (indexed) [DOE]

Development and Maintenance of Criteria and Review Development and Maintenance of Criteria and Review Approach Documents - July 2013 Protocol, Development and Maintenance of Criteria and Review Approach Documents - July 2013 July 2013 Protocol for the Development and Maintenance of Criteria and Review Approach Documents The purpose of this protocol is to establish the requirements and responsibilities for the development and maintenance of Criteria and Review Approach Documents (CRADs) used by the Office of Safety and Emergency Management Evaluations (HS-45). The HS-45 CRADS are carefully selected, modified (if required), and referenced in HS-45 appraisal plans. These plans are used to provide an outline of the activities planned to assess the effectiveness of safety and emergency management processes and

438

Cost effectiveness of recycling: A systems model  

SciTech Connect (OSTI)

Highlights: Curbside collection of recyclables reduces overall system costs over a range of conditions. When avoided costs for recyclables are large, even high collection costs are supported. When avoided costs for recyclables are not great, there are reduced opportunities for savings. For common waste compositions, maximizing curbside recyclables collection always saves money. - Abstract: Financial analytical models of waste management systems have often found that recycling costs exceed direct benefits, and in order to economically justify recycling activities, externalities such as household expenses or environmental impacts must be invoked. Certain more empirically based studies have also found that recycling is more expensive than disposal. Other work, both through models and surveys, have found differently. Here we present an empirical systems model, largely drawn from a suburban Long Island municipality. The model accounts for changes in distribution of effort as recycling tonnages displace disposal tonnages, and the seven different cases examined all show that curbside collection programs that manage up to between 31% and 37% of the waste stream should result in overall system savings. These savings accrue partially because of assumed cost differences in tip fees for recyclables and disposed wastes, and also because recycling can result in a more efficient, cost-effective collection program. These results imply that increases in recycling are justifiable due to cost-savings alone, not on more difficult to measure factors that may not impact program budgets.

Tonjes, David J., E-mail: david.tonjes@stonybrook.edu [Department of Technology and Society, College of Engineering and Applied Sciences, Stony Brook University, Stony Brook, NY 11794-3560 (United States); Waste Reduction and Management Institute, School of Marine and Atmospheric Sciences, Stony Brook University, Stony Brook, NY 11794-5000 (United States); Center for Bioenergy Research and Development, Advanced Energy Research and Technology Center, Stony Brook University, 1000 Innovation Rd., Stony Brook, NY 11794-6044 (United States); Mallikarjun, Sreekanth, E-mail: sreekanth.mallikarjun@stonybrook.edu [Department of Technology and Society, College of Engineering and Applied Sciences, Stony Brook University, Stony Brook, NY 11794-3560 (United States)

2013-11-15T23:59:59.000Z

439

Cost update technology, safety, and costs of decommissioning a reference uranium hexafluoride conversion plant  

SciTech Connect (OSTI)

The purpose of this study is to update the cost estimates developed in a previous report, NUREG/CR-1757 (Elder 1980) for decommissioning a reference uranium hexafluoride conversion plant from the original mid-1981 dollars to values representative of January 1993. The cost updates were performed by using escalation factors derived from cost index trends over the past 11.5 years. Contemporary price quotes wee used for costs that have increased drastically or for which is is difficult to find a cost trend. No changes were made in the decommissioning procedures or cost element requirements assumed in NUREG/CR-1757. This report includes only information that was changed from NUREG/CR-1757. Thus, for those interested in detailed descriptions and associated information for the reference uranium hexafluoride conversion plant, a copy of NUREG/CR-1757 will be needed.

Miles, T.L.; Liu, Y.

1995-08-01T23:59:59.000Z

440

Building America Expert Meeting: Key Innovations for Adding Energy Efficiency to Maintenance Projects  

Broader source: Energy.gov [DOE]

This report describes an expert meeting hosted by the Building America research team NAHB Research Center, which was held on February 8, 2012, in Orlando, Florida. The topic, Key Innovations for Adding Energy Efficiency to Maintenance Projects, was intended to provide direction to more focused efforts to increase the efficiency of existing homes; in this meeting, the focus was specifically for re-roofing and the opportunities for adding energy efficiency upgrades during this major home repair activity.

Note: This page contains sample records for the topic "increased maintenance costs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

A reliability cost-benefit analysis for HVDC transmission expansion planning  

SciTech Connect (OSTI)

A major portion of Manitoba Hydro's generation is located in the North on the Nelson River. The lower Nelson River generation is brought into the load centre in Southern Manitoba through an HVDC transmission system consisting of two bipoles, the first rated at 1680 MW at the rectifier and the second at 2000 MW. This paper presents the methodology used in arriving at the optimum Bipole 3 size using a reliability cost-benefit analysis. The analysis considers the forced outages of the generation and transmission systems using system outage statistics. The generator and valve group maintenance and the reduction in capability of thyristor valve groups during the summer season were also incorporated in the analysis. The load model used in the study was based on system data for the period 1980-1984. The criterion used in choosing the Bipole 3 size is to optimize the present worth value of the annual energy curtailment due to the HVDC system forced outages and the incremental installation cost of the transmission as the capacity of Bipole 3 is increased. The optimum Bipole 3 size based on the study is 2200 MW. This value is significantly lower than that based on a pole spare criterion used in the earlier development of the HVDC system. Finally, the need for validation of the outage data in evaluating future HVDC projects and the need for data collection and classification is indicated.

Kuruganty, P.R.S. (Manitoba Hydro, Winnipeg, Manitoba (CA)); Woodford, D.A. (Manitoba HVDC Research Centre, Winnipeg, Manitoba (CA))

1988-07-01T23:59:59.000Z

442

Tokamak reactor cost model based on STARFIRE/WILDCAT costing  

SciTech Connect (OSTI)

A cost model is presented which is useful for survey and comparative studies of tokamak reactors. The model is heavily based on STARFIRE and WILDCAT costing guidelines, philosophies, and procedures and reproduces the costing for these devices quite accurately.

Evans, K. Jr.

1983-03-01T23:59:59.000Z

443

Coal flow aids reduce coke plant operating costs and improve production rates  

SciTech Connect (OSTI)

Chemical coal flow aids can provide many benefits to coke plants, including improved production rates, reduced maintenance and lower cleaning costs. This article discusses the mechanisms by which coal flow aids function and analyzes several successful case histories. 2 refs., 10 figs., 1 tab.

Bedard, R.A.; Bradacs, D.J.; Kluck, R.W.; Roe, D.C.; Ventresca, B.P.

2005-06-01T23:59:59.000Z

444

Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration. [Reliability Centered Maintenance (RCM)  

SciTech Connect (OSTI)

This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

1992-05-28T23:59:59.000Z

445

DUF6 Management Cost Analysis Report (CAR): Part 2  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

. . . Cost Analysis Report for the Long-Term Management of May 1997 Figure 4.5 Total Costs of Manufacture of Metal Options 900 800 700 Ctj 300 3 200 100 0 Metal Shielding Oxide Shielding Depleted Uranium Hexafluoride and Oxide Shielding s Decontamination & Decommissioning QI Operations & Maintenance s Regulatory Compliance u Balance of Plant u Manufacturing Facilities s Manufacturing Equipment u Engineering Development 57 ..- . Cost Analysis Report for the Long-Term Management of Depleted Uranium Hexafluoride May 1997 4.4 Long-term Storage Storage of depleted uranium is predicated on its use at some later date. In the engineering analysis, storage options are defined by the type of storage facility, and suboptions are defined by the chemical form in which the depleted uranium is stored. The types of storage facilities analyzed are (1) buildings, (2) below ground vaults,

446

Low-Cost "Vacuum Desiccator"  

Science Journals Connector (OSTI)

Low-Cost "Vacuum Desiccator" ... Described are individualized, low-cost, and safe desiccators that can be efficiently and rapidly made with an inexpensive kitchen aid sold for shrink-wrapping food. ... Cost-Effective Teacher ...

Frederick Sweet

2004-10-01T23:59:59.000Z

447

Factors Impacting Decommissioning Costs - 13576  

SciTech Connect (OSTI)

The Electric Power Research Institute (EPRI) studied United States experience with decommissioning cost estimates and the factors that impact the actual cost of decommissioning projects. This study gathered available estimated and actual decommissioning costs from eight nuclear power plants in the United States to understand the major components of decommissioning costs. Major costs categories for decommissioning a nuclear power plant are removal costs, radioactive waste costs, staffing costs, and other costs. The technical factors that impact the costs were analyzed based on the plants' decommissioning experiences. Detailed cost breakdowns by major projects and other cost categories from actual power plant decommissioning experiences will be presented. Such information will be useful in planning future decommissioning and designing new plants. (authors)

Kim, Karen; McGrath, Richard [Electric Power Research Institute, 3420 Hillview Ave., Palo Alto, California (United States)] [Electric Power Research Institute, 3420 Hillview Ave., Palo Alto, California (United States)

2013-07-01T23:59:59.000Z

448

Roadway Improvement Project Cost Allocation  

E-Print Network [OSTI]

Roadway Improvement Project Cost Allocation CTS 21st Annual Transportation Research Conference costs #12;Potential Applications · Roadway Project Feasibility Studies ­ Identified potential roadway infrastructure improvement ­ Documentation of estimated project costs ­ Determine property assessments

Minnesota, University of

449

Sunk Costs and Competitive Bidding  

E-Print Network [OSTI]

SUNK COSTS AND COMPETITIVE BIDDING Kenneth R. FrenchRevised: November 1982 SUNK COSTS AND COMPETITIVE BIDDINGl the winning bid be? I f sunk costs do not matter, I f the

French, Kenneth R.; McCormick, Robert E.

1982-01-01T23:59:59.000Z

450

Assigning research and development costs  

E-Print Network [OSTI]

and Development Cost Components RESEARCH AND DEVELOPMENT COSTS IN FINANCIAL STATEMENTS . 10 Capitalization Basis for Reporting Research and Development Costs Revenue Basis for Reporting Research and Development Costs Reasons Why Most Companies Expense... PRACTICE WITH ACCOUNTING THEORY Unknown Results at the End of an Accounting Period Uncertain Useful Life of Results. . . . . . . . . . . . . Recurrence of Annual Costs Permissive Feature of the Internal Revenue Code Uniform Amounts of Annual Costs...

Edwards, Wendell Edward

2012-06-07T23:59:59.000Z

451

On-line maintenance methodology development and its applications  

SciTech Connect (OSTI)

With the increasing economic pressures being faced and the potential for shortening outage times under the conditions of deregulated electricity markets in the world, licensees are motivated to get an increasing amount of the on-line maintenance (OLM). The benefits of the OLM includes increased system and plant reliability, reduction of plant equipment and system material condition deficiencies that could adversely impact operations, and reduction of work scope during plant refueling outages. In Korea, allowance guidelines of risk assessment is specified in the safety regulation guidelines 16.7 and 16.8 of the Korea Inst. of Nuclear Safety (KINS), which is 'General guidelines of Risk-informed application for requesting permission of changes' and 'Requesting permission of changes of Risk-informed application for Technical Specification'. We select the emergency diesel generator (EDG) of the Ulchin unit 3 and 4 for risk assessment analysis by applying configuration changes. The EDG which has plant safety level IE belongs to on-site standby power (A, B train EDG) in electric distribution system. The EDG is important component because it should maintain standby status during plant is operating, therefore we select the EDG for target component of risk assessment analysis. The risk assessment is limited to CDF. The risk assessment is performed by using AIMS-PSA Release2. We evaluate CDF by applying the configuration changes with some assumptions. Evaluation of the full power operation and Low power/Shut down operation was performed. This study has been performed for introducing a methodology and performing risk assessment. (authors)

Kim, J.; Jae, M. [Dept. of Nuclear Engineering, Hanyang Univ., 17 Haengdang, Sungdong, Seoul (Korea, Republic of)

2012-07-01T23:59:59.000Z

452

INDEPENDENT COST REVIEW (ICR)  

Broader source: Energy.gov (indexed) [DOE]

COST REVIEW (ICR) COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) STANDARD OPERATING PROCEDURES (SOP) Revision 1 DEPARTMENT OF ENERGY (DOE) OFFICE OF ACQUISITION AND PROJECT MANAGEMENT (OAPM) September 2013 SUMMARY OF UPDATES: This revision includes the following significant changes since the December 2011 SOP release: 1. The original SOP discussed how an EIR and an ICE could be executed in tandem, but since we are no longer advocating this approach the ICE process has been completely separated from the EIR process and references to EIRs have been removed. 2. Section 1 adds a reference to Public Law 2055 reflecting that we must now, as a matter of law, perform an ICE at CD-3 for projects with a TPC over $100 million. 3. Section 2 notes that DOE Programs must now pay for ICRs and ICEs and reflects that PARS II must be

453

INDEPENDENT COST REVIEW (ICR)  

Broader source: Energy.gov (indexed) [DOE]

COST REVIEW (ICR) COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) STANDARD OPERATING PROCEDURES (SOP) Revision 1 DEPARTMENT OF ENERGY (DOE) OFFICE OF ACQUISITION AND PROJECT MANAGEMENT (OAPM) September 2013 SUMMARY OF UPDATES: This revision includes the following significant changes since the December 2011 SOP release: 1. The original SOP discussed how an EIR and an ICE could be executed in tandem, but since we are no longer advocating this approach the ICE process has been completely separated from the EIR process and references to EIRs have been removed. 2. Section 1 adds a reference to Public Law 2055 reflecting that we must now, as a matter of law, perform an ICE at CD-3 for projects with a TPC over $100 million. 3. Section 2 notes that DOE Programs must now pay for ICRs and ICEs and reflects that PARS II must be

454

Power Plant Cycling Costs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Plant Cycling Costs Power Plant Cycling Costs April 2012 N. Kumar, P. Besuner, S. Lefton, D. Agan, and D. Hilleman Intertek APTECH Sunnyvale, California NREL Technical Monitor: Debra Lew Subcontract Report NREL/SR-5500-55433 July 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 15013 Denver West Parkway Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Power Plant Cycling Costs April 2012 N. Kumar, P. Besuner, S. Lefton, D. Agan, and D. Hilleman Intertek APTECH Sunnyvale, California NREL Technical Monitor: Debra Lew Prepared under Subcontract No. NFT-1-11325-01

455

Cost Controls Pay Off Big  

Science Journals Connector (OSTI)

Cost Controls Pay Off Big ... Biggest plus was the general improvement in the economy; but to this must be added successful efforts by industry to control costs. ...

1959-02-16T23:59:59.000Z

456

QGESS: Capital Cost Scaling Methodology  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(costs and values of inputs, outputs, and processes, including capital and operating costs) and performance (mass conversion, energy efficiency, and, generally speaking,...

457

Uncertainties in Achieving Energy Savings from HVAC Maintenance Measures in the Field  

E-Print Network [OSTI]

Uncertainties in Achieving Energy Savings from HVAC Maintenance Measures in the Field Kristin utilities across the nation to include HVAC maintenance measures in energy efficiency programs Maintenance measures have a significant potential for energy savings in residential and commercial unitary

California at Davis, University of

458

Maintenance Guide for DOE Low-Level Waste Disposal Facility  

Broader source: Energy.gov (indexed) [DOE]

4 4 G Approved: XX-XX-XX IMPLEMENTATION GUIDE for use with DOE M 435.1-1 Maintenance Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Performance Assessments and Composite Analyses U.S. DEPARTMENT OF ENERGY DOE G 435.1-4 i (and ii) DRAFT XX-XX-XX LLW Maintenance Guide Revision 0, XX-XX-XX Maintenance Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Performance Assessments and Composite Analyses CONTENTS 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.1 Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.2 Organization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 1.3 Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 1.3.1 Objectives . . . . . . . . . . . . . . . . . . . . . . . . .

459

Microsoft Word - 052606 Final Pepco DOE maintenance notice.doc  

Broader source: Energy.gov (indexed) [DOE]

26, 2006 26, 2006 Lawrence Mansueti Office of Electricity Delivery and Energy Reliability U.S. Department of Energy Rm. 8H-033 1000 Independence Avenue Washington, D.C. 20585 Re: Potomac River Generating Station Department of Energy Case No. EO-05-01 Dear Mr. Mansueti, Per your request, Potomac Electric Power Company ("Pepco"), on behalf of itself and PJM Interconnection, L.L.C. ("PJM"), is providing you with information regarding the planned transmission maintenance outage scheduled for the upcoming weekend. Pepco notes that the scheduled maintenance activities are not associated with its new transmission line installation, but are routine maintenance activities resulting from a switch problem identified during routine

460

Low Cost, Durable Seal  

SciTech Connect (OSTI)

Seal durability is critical to achieving the 2010 DOE operational life goals for both stationary and transportation PEM fuel cell stacks. The seal material must be chemically and mechanically stable in an environment consisting of aggressive operating temperatures, humidified gases, and acidic membranes. The seal must also be producible at low cost. Currentlyused seal materials do not meet all these requirements. This project developed and demonstrated a high consistency hydrocarbon rubber seal material that was able to meet the DOE technical and cost targets. Significant emphasis was placed on characterization of the material and full scale molding demonstrations.

Roberts, George; Parsons, Jason; Friedman, Jake

2010-12-17T23:59:59.000Z

Note: This page contains sample records for the topic "increased maintenance costs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Electric Motor Maintenance & Repair for Long Term Efficiency  

E-Print Network [OSTI]

Energy costs to operate electric motors can be a significant part of an operating budget. For example, a recent survey of California water departments reveals energy costs for pumping and treating water may be 25% of operating costs. Strategies...

Brithinee, W. P.

462

Cost Type Examples Salary costs for staff working  

E-Print Network [OSTI]

Cost Type Examples Salary costs for staff working on the grant Fellows, research assistants by the technician can be supported by a verifiable audit trail. Specialist consultancy fees Recruitment costs Staff recruitment and advertising costs, including interviewee travel. Materials & consumables Laboratory chemicals

Rambaut, Andrew

463

Low Cost Carbon Fiber Production Carbon Fiber Manufacturing Cost Modeling  

E-Print Network [OSTI]

Low Cost Carbon Fiber Production Carbon Fiber Manufacturing Cost Modeling Oak Ridge National fiber reinforced composites have enjoyed limited acceptance in the automotive industry due to high costs to bond with composite matrix material. It is important that a carbon fiber manufacturing cost model

464

Combined Heat and Power (CHP): Essential for a Cost Effective Clean Energy Standard, April 2011  

Broader source: Energy.gov [DOE]

White paper demonstrating cost-effective and flexible approach in increasing power-sector efficiency and reducing GHG emissions

465

On the Accuracy of Regulatory Cost Estimates  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

On the Accuracy of Regulatory Cost Estimates On the Accuracy of Regulatory Cost Estimates Speaker(s): Richard Morgenstern Date: December 10, 2013 - 12:00pm - 1:00pm Location: 90-3122 Seminar Host/Point of Contact: Alan Sanstad Margaret Taylor Over the past several decades, the U.S. has seen a gradual reduction in economic regulation and a simultaneous increase in safety, health, environmental, and other social regulations. Especially with the prospect of regulation on greenhouse gases under the Clean Air Act, there is growing concern about the costs, effectiveness, and benefits of federal rules. While prospective or ex ante analyses of the benefits and costs of major federal regulations are now a standard part of government operations, retrospective or ex post analyses, focusing on measurements of actual

466

Renewable electricity policies, heterogeneity, and cost effectiveness  

Science Journals Connector (OSTI)

Abstract Renewable electricity policies promote investment in renewable electricity generators and have become increasingly common around the world. Because of intermittency and the composition of other generators in the power system, the value of certain renewable particularly wind and solar varies across locations and technologies. This paper investigates the implications of this heterogeneity for the cost effectiveness of renewable electricity policies. A simple model of the power system shows that renewable electricity policies cause different investment mixes. Policies also differ according to their effect on electricity prices, and both factors cause the cost effectiveness to vary across policies. We use a detailed, long-run planning model that accounts for intermittency on an hourly basis to compare the cost effectiveness for a range of policies and alternative parameter assumptions. The differences in cost effectiveness are economically significant, where broader policies, such as an emissions price, outperform renewable electricity policies.

Harrison Fell; Joshua Linn

2013-01-01T23:59:59.000Z

467

UNDP-Energy Costing Tool | Open Energy Information  

Open Energy Info (EERE)

UNDP-Energy Costing Tool UNDP-Energy Costing Tool (Redirected from UNDP Energy Costing Tool) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: UNDP Energy Costing Tool Agency/Company /Organization: United Nations Development Programme Sector: Energy Topics: Pathways analysis, Resource assessment Resource Type: Software/modeling tools User Interface: Spreadsheet Website: www.undp.org/energy/mdg-serv.htm Cost: Free Equivalent URI: cleanenergysolutions.org/content/energy-costing-tool Language: English References: UNDP MDG Support Services [1] The Energy Costing Tool is an Excel-based model designed to help countries estimate the costs of increasing access to energy services to support the achievement of the UN Millennium Development Goals (MGD). More information is available on the

468

E-Print Network 3.0 - alternative telomere maintenance Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Summary: plays a role in telomere maintenance. To investigate the possibility that ORC bound to telo- mere... to varying extents in cells with different telomere-maintenance...

469

How to Determine and Verify Operating and Maintenance (O&M) Savings...  

Broader source: Energy.gov (indexed) [DOE]

and Maintenance in Federal Energy Savings Performance Contracts Operations & Maintenance Best Practices Guide: Chapter 3 DRAFT Measurement & Verification Guidelines Version 4.0...

470

Estimating SCR installation costs  

SciTech Connect (OSTI)

The EUCG surveyed 72 separate US installations of selective catalytic reduction (SCR) systems at coal-fired units totalling 41 GW of capacity to identify the systems' major cost drivers. The results, summarized in this article, provide excellent first-order estimates and guidance for utilities considering installing the downstream emissions-control technology. 4 figs., 1 tab.

Marano, M.; Sharp, G. [American Electric Power (United States)

2006-01-15T23:59:59.000Z

471

Invoice Statement of Cost Cost Type/Cost Share UT-B Contracts Div Page 1 of 1  

E-Print Network [OSTI]

Invoice Statement of Cost ­ Cost Type/Cost Share UT-B Contracts Div Aug 2009 Page 1 of 1 invoice-state-cost-ext-venx-aug09 Company Name: Statement of Amounts Claimed Invoice Number: Statement of Cost ­ Cost Type/Cost Cost Subcontractor Cost Job Title Name Current Hours Rate Current Amount Cumulative Hours Cumulative

Pennycook, Steve

472

Training on PV Systems: Design, Construction, Operation and Maintenance |  

Open Energy Info (EERE)

Training on PV Systems: Design, Construction, Operation and Maintenance Training on PV Systems: Design, Construction, Operation and Maintenance Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Training on PV Systems: Design, Construction, Operation and Maintenance Agency/Company /Organization: Leonardo Energy Sector: Energy Focus Area: Renewable Energy, Solar Website: www.leonardo-energy.org/node/5948 Training on PV Systems: Design, Construction, Operation and Maintenance Screenshot References: PV Training [1] Overview "A free series of six webinars will be delivered to provide the required knowledge to design a high performance photovoltaic (PV) installation, entering into economic evaluation and project cash-flow. Additionally, very practical aspects such as the construction, start-up, quality management and testing will be reviewed. Plant operation is described in detail, with

473

Federal Energy Management Program: Resources on Operations and Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Operations and Maintenance Operations and Maintenance Graphic of the eTraining logo Training Available Advanced Electric Metering in Federal Facilities: Learn how to take full advantage of advanced electric metering systems by taking this FEMP eTraining course. Many helpful resources about operations and maintenance are available. Best Practices Operations and Maintenance Best Practices Guide: Outlines best practices to help Federal agencies implement effective O&M for systems and equipment found at their facilities. Federal Facilities Council: Website features events, reports, and links to National Academy websites. Commissioning Commissioning for Federal Facilities: Comprehensive information on ongoing commissioning processes to resolve operating problems, improve comfort, optimize energy use, and identify retrofits for commercial and institutional buildings and central plant facilities.

474

Job Maintenance and Capital Development Fund (North Carolina) | Department  

Broader source: Energy.gov (indexed) [DOE]

Maintenance and Capital Development Fund (North Carolina) Maintenance and Capital Development Fund (North Carolina) Job Maintenance and Capital Development Fund (North Carolina) < Back Eligibility Commercial Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State North Carolina Program Type Grant Program Provider Department of Commerce The Job Maintenance and Capital Development Fund provides annual grants to businesses which are located in Development Tier I counties. The Fund is intended to encourage the retention of significant numbers of high-paying, high-quality job and large-scale capital investments. Grants may be made for a term of up to ten years. The business must have at least 2000 employees and invest $200 million in capital improvements

475

Post-Deactivation Surveillance and Maintenance Planning | Department of  

Broader source: Energy.gov (indexed) [DOE]

Post-Deactivation Surveillance and Maintenance Planning Post-Deactivation Surveillance and Maintenance Planning Post-Deactivation Surveillance and Maintenance Planning One of the key elements of end-point planning is knowing what the post-deactivation S&M activities will be so that conditions can be established to support them. The post-deactivation S&M plan specifies the surveillance, inspection, and maintenance of the facility in the deactivated state. It should address the activities, the locations in which they will be conducted, and their frequency. Part of the S&M planning is deciding which spaces must be accessed and which equipment must be operated. This should be agreed upon with the organization that will receive the facility for subsequent S&M and, where needed to meet a stakeholder, regulatory, and tribal nations commitment.

476

CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor  

Broader source: Energy.gov (indexed) [DOE]

Reactor Reactor CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor February 2007 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Maintenance Program in preparation for restart of the Oak Ridge National Laboratory High Flux Isotope Reactor. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor More Documents & Publications CRAD, Safety Basis - Oak Ridge National Laboratory High Flux Isotope Reactor CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor

477

CRAD, Maintenance - Idaho Accelerated Retrieval Project Phase II |  

Broader source: Energy.gov (indexed) [DOE]

Idaho Accelerated Retrieval Project Phase II Idaho Accelerated Retrieval Project Phase II CRAD, Maintenance - Idaho Accelerated Retrieval Project Phase II Feburary 2006 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Maintenance program at the Idaho National Laboratory, Idaho Accelerated Retrieval Project Phase II. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Maintenance - Idaho Accelerated Retrieval Project Phase II More Documents & Publications CRAD, Maintenance - Los Alamos National Laboratory TA 55 SST Facility

478

Multi-canister overpack operations and maintenance manual  

SciTech Connect (OSTI)

This manual provides general operating and maintenance instructions for the Multi-Canister Overpack. Procedure outlines included are conceptual in nature and will be modified, expanded, and refined during preparation of detailed operating procedures.

PIERCE, S.R.

1999-06-23T23:59:59.000Z

479

Maintenance features of the Compact Ignition Tokamak fusion reactor  

SciTech Connect (OSTI)

The Compact Ignition Tokamak (CIT) is envisaged to be the next experimental machine in the US Fusion Program. Its use of deuterium/tritium fuel requires the implementation of remote handling technology for maintenance and disassembly operations. The reactor is surrounded by a close-proximity nuclear shield which is designed to permit personnel access within the test cell, one day after shutdown. With the shield in place, certain maintenance activities in the cell may be done hands-on. Maintenance on the reactor is accomplished remotely using a boom-mounted manipulator after disassembling the shield. Maintenance within the plasma chamber is accomplished with two articulated boom manipulators that are capable of operating in a vacuum environment. They are stored in a vacuum enclosure behind movable shield plugs.

Spampinato, P.T.; Hager, E.R.

1987-01-01T23:59:59.000Z

480

Assessment of Bridge Inspection and Maintenance in the United States  

E-Print Network [OSTI]

Bridge inspection and maintenance is extremely important to the country since it is the economic lifeblood of the United States business and people relying upon them to do business and get to work. Although bridge disasters are relatively rare...

Kwok, Kin Yip George

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "increased maintenance costs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Pre-conceptual Design Assessment of DEMO Remote Maintenance  

E-Print Network [OSTI]

EDFA, as part of the Power Plant Physics and Technology programme, has been working on the pre-conceptual design of a Demonstration Power Plant (DEMO). As part of this programme, a review of the remote maintenance strategy considered maintenance solutions compatible with expected environmental conditions, whilst showing potential for meeting the plant availability targets. A key finding was that, for practical purposes, the expected radiation levels prohibit the use of complex remote handling operations to replace the first wall. In 2012/13, these remote maintenance activities were further extended, providing an insight into the requirements, constraints and challenges. In particular, the assessment of blanket and divertor maintenance, in light of the expected radiation conditions and availability, has elaborated the need for a very different approach from that of ITER. This activity has produced some very informative virtual reality simulations of the blanket segments and pipe removal that are exceptionally ...

Loving, A; Sykes, N; Iglesias, D; Coleman, M; Thomas, J; Harman, J; Fischer, U; Sanz, J; Siuko, M; Mittwollen, M; others,

2013-01-01T23:59:59.000Z

482

Long-Term Surveillance Operations and Maintenance Fiscal Year...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and Maintenance Fiscal Year 2013 Year-End Summary Report LTS-O&M is at the core of LM efforts to fulfill a strategy that includes objectives published in the 2011-2020...

483

National Geothermal Data System Architecture Design, Testing and Maintenance  

Broader source: Energy.gov [DOE]

Project objective: To create the National Geothermal Data System (NGDS) comprised of a core and distributed network of databases and data sites that will comprise a federated system for acquisition, management, maintenance, and dissemination of geothermal and related data.

484

Chapter 18 - Pipeline Vibration and Condition Based Maintenance  

Science Journals Connector (OSTI)

This chapter comprises two integrated parts. The first part of the chapter devotes to a detailed discussion of the mechanism leading to pipeline vibration and the effect of internal and external fluid flow on the pipeline vibration. It summarizes the formulations used for the design of optimal free span length of pipeline segments under different boundary conditions and pipeline operating conditions. Different measures used to mitigate pipeline vibration are also briefly discussed in the section. The procedures of pipeline condition based maintenance (CBM) are discussed in the second part of the chapter using vibration and other corrective maintenance (CM) parameters as asset health indicators. The typical models including PF curve model, proportional hazard model, and proportional covariate model used to determine the optimal threshold and inspection intervals in CBM are introduced and discussed. The chapter also discusses the optimization of long-term maintenance activities using reliability based preventive maintenance decision-making approach.

Boyun Guo; Shanhong Song; Ali Ghalambor; Tian Ran Lin

2014-01-01T23:59:59.000Z

485

An approach to measuring the quality of maintenance performance  

Science Journals Connector (OSTI)

......finished product. Thus, it involves some capital investment with expected turnover on...maintenance profitability if the total expenditure remains approx- imately constant is...assets: theoretical architecture and capital value theory in perspective. Ph.D......

S. A. Oke; M. K. O. Ayomoh; I. O. Oyedokun

2007-01-01T23:59:59.000Z

486

Maintenance Guide for DOE Low-Level Waste Disposal Facility ...  

Office of Environmental Management (EM)

Guide for DOE Low-Level Waste Disposal Facility Maintenance Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Performance Assessments and Composite Analyses...

487

Maintenance and Operations of Schools for Energy Efficiency  

E-Print Network [OSTI]

in more than 100 Texas public school districts. The most commonly observed problems in maintaining and operating public schools for energy efficiency are presented along with successful basic methods of inspecting schools for energy efficient maintenance...

McClure, J. D.; Estes, J. M.

1986-01-01T23:59:59.000Z

488

Suggested improvements to solar system maintenance based on field experience  

SciTech Connect (OSTI)

Field experience has shown that maintenance is a critical factor in determining the overall success of a solar system. This paper summarizes the field experience with the maintenance of over 30 solar installations, three of which contain more than 500 individual solar systems for residential housing. The field results show several severe problems, and an analysis indicates that a number of improvements can be made to help avoid them. These include (1) improving solar designs, (2) producing service documents, and (3) providing training for maintenance personnel. Specific technical improvements to solar designs are presented in this paper, the number and content of service documents are outlined, and suggestions for training of maintenance personnel are presented.

Johnson, D.L.; Hittle, D.C.; Joncich, D.M.

1983-06-01T23:59:59.000Z

489

Enhancing Building Performance Through More Responsive Maintenance System  

E-Print Network [OSTI]

Electric Company (SCECO) are modeled in Extend+BPR to be an experimental tool for evaluating the benefits of multi-skilled technicians. The simulation models of this study showed significant improvement in both preventive and corrective maintenance...

Alsudairi, A. A.

2012-01-01T23:59:59.000Z

490

Post-Deactivation Surveillance and Maintenance Planning | Department of  

Broader source: Energy.gov (indexed) [DOE]

Post-Deactivation Surveillance and Maintenance Planning Post-Deactivation Surveillance and Maintenance Planning Post-Deactivation Surveillance and Maintenance Planning One of the key elements of end-point planning is knowing what the post-deactivation S&M activities will be so that conditions can be established to support them. The post-deactivation S&M plan specifies the surveillance, inspection, and maintenance of the facility in the deactivated state. It should address the activities, the locations in which they will be conducted, and their frequency. Part of the S&M planning is deciding which spaces must be accessed and which equipment must be operated. This should be agreed upon with the organization that will receive the facility for subsequent S&M and, where needed to meet a stakeholder, regulatory, and tribal nations commitment.

491

CRAD, Maintenance - Los Alamos National Laboratory TA 55 SST Facility |  

Broader source: Energy.gov (indexed) [DOE]

Los Alamos National Laboratory TA 55 SST Los Alamos National Laboratory TA 55 SST Facility CRAD, Maintenance - Los Alamos National Laboratory TA 55 SST Facility A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for an assessment of the Maintenance program at the Los Alamos National Laboratory TA 55 SST Facility. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Maintenance - Los Alamos National Laboratory TA 55 SST Facility More Documents & Publications CRAD, Maintenance - Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility CRAD, Configuration Management - Los Alamos National Laboratory TA 55 SST

492

Integrating the cold load pickup effect of reserve supplying demand response resource in social cost minimization based system scheduling  

Science Journals Connector (OSTI)

Expansion of smart grids and aggregator business facilitates the utilization of reserve supplying demand response (RSDR) resources. One of the loads that are increasingly used for reserve provision is air-conditioning load (ACL) that have cold load pickup (CLPU) or payback characteristics. With larger scale utilization of RSDR resources, as an effect of increasing DR aggregation business, CLPU characteristics of ACL can affect system optimal operation. Actual utilization time and duration of RSDR resources are probabilistic and affected by system scheduling and contingency occurrence. Therefore the CLPU effect of RSDR resources is probabilistic. This creates extra burden on the system reliability maintenance that should be considered from social cost minimization point of view. This complexity is addressed in this paper by modeling the extra expected load not supplied (ELNS) that the probabilistic CLPU of RSDR can impose on system. Then the aggregated RSDR resources, with CLPU characteristics, are integrated into day-ahead simultaneous system scheduling with the objective function of social cost minimization. This study showed that CLPU can have considerable effects on system scheduling and RSDR effectiveness. The proposed method of this paper proved to be useful for reducing the negative effects of CLPU while using RSDR resources.

Mahdi Behrangrad; Hideharu Sugihara; Tsuyoshi Funaki

2012-01-01T23:59:59.000Z

493

Analyzing Massive Machine Maintenance Data in a Computing Cloud  

Science Journals Connector (OSTI)

We present a novel framework, CloudView, for storage, processing and analysis of massive machine maintenance data, collected from a large number of sensors embedded in industrial machines, in a cloud computing environment. This paper describes the architecture, ... Keywords: Sensors,Real time systems,Data analysis,Reliability,Cloud computing,Wind turbines,Maintenance engineering,MapReduce,Fault prediction,machine data analysis,case-based reasoning,cloud computing,Hadoop

Arshdeep Bahga; Vijay K. Madisetti

2012-10-01T23:59:59.000Z

494

Robust Cost Colorings Takuro Fukunaga  

E-Print Network [OSTI]

Robust Cost Colorings Takuro Fukunaga Magn´us M. Halld´orsson Hiroshi Nagamochi Abstract We consider graph coloring problems where the cost of a coloring is the sum of the costs of the colors, and the cost of a color is a monotone concave function of the total weight of the class. This models resource

Halldórsson, Magnús M.

495

Cost Estimates for New Molecules  

Science Journals Connector (OSTI)

Cost Estimates for New Molecules ... Once this has been carried out, the projected cost/kilogram for the new drug substance (if only raw material costs and no manufacturing/overhead/labour costs are considered) may well come down by a factor of 10 or even 100, and this is often more acceptable to management trying to make strategic decisions about potential profitability. ...

Trevor Laird

2005-02-22T23:59:59.000Z

496

Cost Sharing Why and How  

E-Print Network [OSTI]

Cost Sharing Why and How Trudy M. Riley Assistant Provost, Research Administration Susan M. Tkachick Sponsored Research Accountant $ Research Office #12;Research Office AGENDA What is Cost Sharing Why Cost Share What is Allowable Managing Cost Sharing during the life of the project What happens

Firestone, Jeremy

497

7 - Cost-Efficiency Evaluation  

Science Journals Connector (OSTI)

The purpose of cost-efficiency evaluations is to make the connection between cost and outcomes. Using methods like cost-benefit analysis and cost-effective analysis, this allows evaluators to provide the most complete information. The information may be used to make better decisions about implementation or continuing a program.

Gennaro F. Vito; George E. Higgins

2015-01-01T23:59:59.000Z

498

Cost Estimating, Analysis, and Standardization  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish policy and responsibilities for: (a) developing and reviewing project cost estimates; (b) preparing independent cost estimates and analysis; (c) standardizing cost estimating procedures; and (d) improving overall cost estimating and analytical techniques, cost data bases, cost and economic escalation models, and cost estimating systems. Cancels DOE O 5700.2B, dated 8-5-1983; DOE O 5700.8, dated 5-27-1981; and HQ 1130.1A, dated 12-30-1981. Canceled by DOE O 5700.2D, dated 6-12-1992

1984-11-02T23:59:59.000Z

499

Low Cost Hydrogen Production Platform  

SciTech Connect (OSTI)

A technology and design evaluation was carried out for the development of a turnkey hydrogen production system in the range of 2.4 - 12 kg/h of hydrogen. The design is based on existing SMR technology and existing chemical processes and technologies to meet the design objectives. Consequently, the system design consists of a steam methane reformer, PSA system for hydrogen purification, natural gas compression, steam generation and all components and heat exchangers required for the production of hydrogen. The focus of the program is on packaging, system integration and an overall step change in the cost of capital required for the production of hydrogen at small scale. To assist in this effort, subcontractors were brought in to evaluate the design concepts and to assist in meeting the overall goals of the program. Praxair supplied the overall system and process design and the subcontractors were used to evaluate the components and system from a manufacturing and overall design optimization viewpoint. Design for manufacturing and assembly (DFMA) techniques, computer models and laboratory/full-scale testing of components were utilized to optimize the design during all phases of the design development. Early in the program evaluation, a review of existing Praxair hydrogen facilities showed that over 50% of the installed cost of a SMR based hydrogen plant is associated with the high temperature components (reformer, shift, steam generation, and various high temperature heat exchange). The main effort of the initial phase of the program was to develop an integrated high temperature component for these related functions. Initially, six independent concepts were developed and the processes were modeled to determine overall feasibility. The six concepts were eventually narrowed down to the highest potential concept. A US patent was awarded in February 2009 for the Praxair integrated high temperature component design. A risk analysis of the high temperature component was conducted to identify any potential design deficiency related to the concept. The analysis showed that no fundamental design flaw existed with the concept, but additional simulations and prototypes would be required to verify the design prior to fabricating a production unit. These identified risks were addressed in detail during Phase II of the development program. Along with the models of the high temperature components, a detailed process and 3D design model of the remainder of system, including PSA, compression, controls, water treatment and instrumentation was developed and evaluated. Also, in Phase II of the program, laboratory/fullscale testing of the high temperature components was completed and stable operation/control of the system was verified. The overall design specifications and test results were then used to develop accurate hydrogen costs for the optimized system. Praxair continued development and testing of the system beyond the Phase II funding provided by the DOE through the end of 2008. This additional testing is not documented in this report, but did provide significant additional data for development of a prototype system as detailed in the Phase III proposal. The estimated hydrogen product costs were developed (2007 basis) for the 4.8 kg/h system at production rates of 1, 5, 10, 100 and 1,000 units built per year. With the low cost SMR approach, the product hydrogen costs for the 4.8 kg/h units at 50 units produced per year were approximately $3.02 per kg. With increasing the volume production to 1,000 units per year, the hydrogen costs are reduced by about 12% to $2.67 per kg. The cost reduction of only 12% is a result of significant design and fabrication efficiencies being realized in all levels of production runs through utilizing the DFMA principles. A simplified and easily manufactured design does not require large production volumes to show significant cost benefits. These costs represent a significant improvement and a new benchmark in the cost to produce small volume on-site hydrogen using existing process technologies. The cost mo

Timothy M. Aaron, Jerome T. Jankowiak

2009-10-16T23:59:59.000Z

500

Health, Safety and Sustainability in Maintenance  

Science Journals Connector (OSTI)

The concept of sustainability is increasingly gaining importance in all aspects ... to meet their own needs. It has three pillars; economy, society and environment, as illustrated...4.3 using three overlapping e...

Umar M. Al-Turki; Tahir Ayar

2014-01-01T23:59:59.000Z