Powered by Deep Web Technologies
Note: This page contains sample records for the topic "include revised licensing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Non-Power Reactor Operator Licensing Examiner Standards. Revision 1  

SciTech Connect

The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience.

NONE

1995-06-01T23:59:59.000Z

2

DOE Revises its NEPA Regulations, Including Categorical Exclusions |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Revises its NEPA Regulations, Including Categorical Exclusions Revises its NEPA Regulations, Including Categorical Exclusions DOE Revises its NEPA Regulations, Including Categorical Exclusions September 30, 2011 - 2:30pm Addthis On September 27, 2011, the Department of Energy (DOE) approved revisions to its National Environmental Policy Act (NEPA) regulations, and on September 28th, submitted the revisions to the Federal Register. The final regulations, which become effective 30 days after publication in the Federal Register, are the culmination of a 2-year process to review and update DOE's NEPA implementing procedures. This process involved internal evaluation, public participation, and Council on Environmental Quality (CEQ) review. The revisions are designed to focus Departmental resources on projects with the potential for significant environmental impact, to better

3

Improved best estimate plus uncertainty methodology including advanced validation concepts to license evolving nuclear reactors  

SciTech Connect

Many evolving nuclear energy programs plan to use advanced predictive multi-scale multi-physics simulation and modeling capabilities to reduce cost and time from design through licensing. Historically, the role of experiments was primary tool for design and understanding of nuclear system behavior while modeling and simulation played the subordinate role of supporting experiments. In the new era of multi-scale multi-physics computational based technology development, the experiments will still be needed but they will be performed at different scales to calibrate and validate models leading predictive simulations. Cost saving goals of programs will require us to minimize the required number of validation experiments. Utilization of more multi-scale multi-physics models introduces complexities in the validation of predictive tools. Traditional methodologies will have to be modified to address these arising issues. This paper lays out the basic aspects of a methodology that can be potentially used to address these new challenges in design and licensing of evolving nuclear technology programs. The main components of the proposed methodology are verification, validation, calibration, and uncertainty quantification. An enhanced calibration concept is introduced and is accomplished through data assimilation. The goal is to enable best-estimate prediction of system behaviors in both normal and safety related environments. To achieve this goal requires the additional steps of estimating the domain of validation and quantification of uncertainties that allow for extension of results to areas of the validation domain that are not directly tested with experiments, which might include extension of the modeling and simulation (M&S) capabilities for application to full-scale systems. The new methodology suggests a formalism to quantify an adequate level of validation (predictive maturity) with respect to required selective data so that required testing can be minimized for cost saving purposes by showing further testing wold not enhance the quality of the validation of predictive tools. The proposed methodology is at a conceptual level. When matured and if considered favorably by the stakeholders, it could serve as a new framework for the next generation of the best estimate plus uncertainty licensing methodology that USNRC developed previously. In order to come to that level of maturity it is necessary to communicate the methodology to scientific, design and regulatory stakeholders for discussion and debates. This paper is the first step to establish this communication.

Unal, Cetin [Los Alamos National Laboratory; Williams, Brian [Los Alamos National Laboratory; Mc Clure, Patrick [Los Alamos National Laboratory; Nelson, Ralph A [IDAHO NATIONAL LAB

2010-01-01T23:59:59.000Z

4

SCALE: A modular code system for performing standardized computer analyses for licensing evaluation. Control modules -- Volume 1, Revision 4  

SciTech Connect

SCALE--a modular code system for Standardized Computer Analyses Licensing Evaluation--has been developed by Oak Ridge National Laboratory at the request of the US Nuclear Regulatory Commission. The SCALE system utilizes well-established computer codes and methods within standard analysis sequences that (1) allow an input format designed for the occasional user and/or novice, (2) automate the data processing and coupling between modules, and (3) provide accurate and reliable results. System development has been directed at problem-dependent cross-section processing and analysis of criticality safety, shielding, heat transfer, and depletion/decay problems. Since the initial release of SCALE in 1980, the code system has been heavily used for evaluation of nuclear fuel facility and package designs. This revision documents Version 4.2 of the system. This manual is divided into three volumes: Volume 1--for the control module documentation, Volume 2--for the functional module documentation, and Volume 3 for the documentation of the data libraries and subroutine libraries.

Landers, N.F.; Petrie, L.M.; Knight, J.R. [Oak Ridge National Lab., TN (United States)] [and others

1995-04-01T23:59:59.000Z

5

DRIVER LICENSE NUMBER MUST BE INCLUDED ON RESUME All qualified applicants must submit a cover letter and resume detailing education and work  

E-Print Network (OSTI)

DRIVER LICENSE NUMBER MUST BE INCLUDED ON RESUME All qualified applicants must submit a cover letter and resume detailing education and work experience to the City of Waterloo Human Resources Department, 715 Mulberry Street, Waterloo, Iowa 50703 or email employment@waterloo-ia.org. The resume must

Isaacs, Rufus

6

SCALE: A modular code system for performing Standardized Computer Analyses for Licensing Evaluation. Volume 2, Part 3: Functional modules F16--F17; Revision 5  

SciTech Connect

SCALE--a modular code system for Standardized Computer Analyses Licensing Evaluation--has been developed by Oak Ridge National Laboratory at the request of the US Nuclear Regulatory Commission. The SCALE system utilizes well-established computer codes and methods within standard analysis sequences that (1) allow an input format designed for the occasional user and/or novice, (2) automated the data processing and coupling between modules, and (3) provide accurate and reliable results. System development has been directed at problem-dependent cross-section processing and analysis of criticality safety, shielding, heat transfer, and depletion/decay problems. Since the initial release of SCALE in 1980, the code system has been heavily used for evaluation of nuclear fuel facility and package designs. This revision documents Version 4.3 of the system.

NONE

1997-03-01T23:59:59.000Z

7

SCALE: A modular code system for performing Standardized Computer Analyses for Licensing Evaluation. Volume 1, Part 2: Control modules S1--H1; Revision 5  

SciTech Connect

SCALE--a modular code system for Standardized Computer Analyses Licensing Evaluation--has been developed by Oak Ridge National Laboratory at the request of the US Nuclear Regulatory Commission. The SCALE system utilizes well-established computer codes and methods within standard analysis sequences that (1) allow an input format designed for the occasional user and/or novice, (2) automated the data processing and coupling between modules, and (3) provide accurate and reliable results. System development has been directed at problem-dependent cross-section processing and analysis of criticality safety, shielding, heat transfer, and depletion/decay problems. Since the initial release of SCALE in 1980, the code system has been heavily used for evaluation of nuclear fuel facility and package designs. This revision documents Version 4.3 of the system.

NONE

1997-03-01T23:59:59.000Z

8

Technology Licensing  

NLE Websites -- All DOE Office Websites (Extended Search)

Licensing INL contractor-owned inventions are available for licensing and commercialization by U.S. and foreign companies and organizations. The INL licenses its intellectual...

9

SCALE: A modular code system for performing standardized computer analyses for licensing evaluation. Functional modules F9--F16 -- Volume 2, Part 2, Revision 4  

SciTech Connect

SCALE--a modular code system for Standardized Computer Analyses Licensing Evaluation--has been developed by Oak Ridge National Laboratory at the request of the US Nuclear Regulatory Commission. The SCALE system utilizes well-established computer codes and methods within standard analysis sequences that (1) allow an input format designed for the occasional user and/or novice, (2) automate the data processing and coupling between modules, and (3) provide accurate and reliable results. System development has been directed at problem-dependent cross-section processing and analysis of criticality safety, shielding, heat transfer, and depletion/decay problems. Since the initial release of SCALE in 1980, the code system has been heavily used for evaluation of nuclear fuel facility and package designs. This revision documents Version 4.2 of the system. The manual is divided into three volumes: Volume 1--for the control module documentation, Volume 2--for functional module documentation; and Volume 3--for documentation of the data libraries and subroutine libraries. This volume discusses the following functional modules: MORSE-SGC; HEATING 7.2; KENO V.a; JUNEBUG-II; HEATPLOT-S; REGPLOT 6; PLORIGEN; and OCULAR.

West, J.T.; Hoffman, T.J.; Emmett, M.B.; Childs, K.W.; Petrie, L.M.; Landers, N.F.; Bryan, C.B.; Giles, G.E. [Oak Ridge National Lab., TN (United States)

1995-04-01T23:59:59.000Z

10

SCALE: A modular code system for performing standardized computer analyses for licensing evaluation. Functional modules F1--F8 -- Volume 2, Part 1, Revision 4  

SciTech Connect

SCALE--a modular code system for Standardized Computer Analyses Licensing Evaluation--has been developed by Oak Ridge National Laboratory at the request of the US Nuclear Regulatory Commission. The SCALE system utilizes well-established computer codes and methods within standard analysis sequences that (1) allow an input format designed for the occasional user and/or novice, (2) automate the data processing and coupling between modules, and (3) provide accurate and reliable results. System development has been directed at problem-dependent cross-section processing and analysis of criticality safety, shielding, heat transfer, and depletion/decay problems. Since the initial release of SCALE in 1980, the code system has been heavily used for evaluation of nuclear fuel facility and package designs. This revision documents Version 4.2 of the system. The manual is divided into three volumes: Volume 1--for the control module documentation; Volume 2--for functional module documentation; and Volume 3--for documentation of the data libraries and subroutine libraries.

Greene, N.M.; Petrie, L.M.; Westfall, R.M.; Bucholz, J.A.; Hermann, O.W.; Fraley, S.K. [Oak Ridge National Lab., TN (United States)

1995-04-01T23:59:59.000Z

11

Solar Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contractor Licensing Contractor Licensing Solar Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Heating & Cooling Commercial Heating & Cooling Solar Heating Buying & Making Electricity Swimming Pool Heaters Water Heating Program Info State California Program Type Solar/Wind Contractor Licensing Provider California Contractors State License Board The California Contractors State License Board administers contractor licenses. The C-46 Solar Contractor license covers active solar water and space heating systems, solar pool heating systems, and photovoltaic systems. C-46 requirements include four years of experience and passing the business and law exam and the trade exam. Independent license schools offer courses to prepare for license exams.

12

Negotiable Licensing  

NLE Websites -- All DOE Office Websites (Extended Search)

Negotiable Licensing Negotiable Licensing Negotiable Licenses LANL's significant portfolio of intellectual property (patents, copyrights, and trademarks) primarily results from federally-sponsored research and development in support of the Laboratory's national security mission. Also, we collaborate with industry to develop innovative, application-specific technology to further our partner's ultimate commercialization objectives. In each case, we develop valuable technology that provides benefit to both the public and private sectors, the majority of which is available for commercial licensing. To ensure that our partners have the necessary intellectual property advantage to successfully deploy LANL technology, we offer a variety of negotiable commercial license agreements that can be tailored to suit specific market

13

NREL: Technology Transfer - Licensing Agreements  

NLE Websites -- All DOE Office Websites (Extended Search)

Licensing Agreements Licensing Agreements Through licensing agreements, NREL provides industry with an opportunity to commercialize NREL-developed energy technologies and products. Our licensing opportunities are available to both small and large businesses-from start-ups to Fortune 500 companies. Process The licensing agreement process basically includes seven steps. See the NREL Licensing Agreement Process flowchart. We are committed to working through these steps in a timely manner. Experience suggests that the fastest means to reach an agreement is through direct communications to create understanding and agree on actions. 1. Identify and Qualify Opportunity To identify an opportunity, a company can browse the technologies available for licensing. When an opportunity has been identified, NREL then asks the company to

14

NREL: Technology Transfer - Technologies Available for Licensing  

NLE Websites -- All DOE Office Websites (Extended Search)

Technologies Available for Licensing Technologies Available for Licensing Photo of NREL scientist in the NREL Hydrogen Lab. NREL's scientists and engineers develop award-winning technologies available for licensing. NREL scientists and engineers produce breakthrough and award-winning renewable energy and energy efficiency technologies that are available for licensing. We have many licensing opportunities for NREL-developed technologies, including our featured LED technologies. To see all our technologies available for licensing, visit the EERE Innovation Portal and search for NREL. Learn about our licensing agreement process. Contact For more information about licensing NREL-developed technologies, contact Eric Payne, 303-275-3166. Ombuds NREL strives to quickly resolve any issue or concern you may have regarding

15

Technology Licensing | NREL  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Innovation Portal. SPX Heat Transfer licensed NREL's advanced direct contact condenser to boost geothermal power plant output. Licenses Since 2000, NREL has executed more...

16

TAO: License  

NLE Websites -- All DOE Office Websites (Extended Search)

Copyright 2013 , UChicago Argonne, LLC Copyright 2013 , UChicago Argonne, LLC Operator of Argonne National Laboratory All rights reserved. Toolkit for Advanced Optimization (TAO), Version 2.2.0 OPEN SOURCE LICENSE Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met: Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer. Software changes, modifications, or derivative works, should be noted with comments and the author and organization's name. Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution.

17

MATLAB muliplatform research license: Numeric computation, advanced graphics and visualization, and a high-level programming  

E-Print Network (OSTI)

MATLAB muliplatform research license: Numeric computation, advanced graphics and visualization license allows research and includes the following: Feature # of users MATLAB 7 Simulink 6 Control System

Dawson, Jeff W.

18

Wave Energy Development in Oregon Licensing & Permitting Requirements  

E-Print Network (OSTI)

...............................................................................................................................................6 State Hydroelectric License

19

Solar Heating Contractor Licensing  

Energy.gov (U.S. Department of Energy (DOE))

Michigan offers a solar heating contractor specialty license to individuals who have at least three years of experience installing solar equipment under the direction of a licensed solar contractor...

20

DRAFT REVISION  

NLE Websites -- All DOE Office Websites (Extended Search)

-2 -2 Processing Inactive Records Revised Version Issued as P 200.2-2B LM Procedure 200.2-2A, Processing Internal Inactive Records for Storage of 7/18/07, has undergone revision. The revised procedure includes updated references, definitions, and formatting. Please replace LM Procedure 200.2-2A with LM Procedure 200.2-2B. The most recent and official controlled hard copy version of this document resides with LM's Directives Coordinator. An electronic version of the controlled document has been placed on the LM Intranet for employee use. Printed hard copies of this electronic version are considered uncontrolled documents. Procedure 200.2-2B INITIATED BY: Office of Business Operations NO. OF PAGES/ATTACHMENTS: 10 pages, 4 attachments U.S. Department of Energy

Note: This page contains sample records for the topic "include revised licensing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Standard review plan and acceptance criteria. NUREG - 1537, Part 2  

SciTech Connect

NUREG - 1537, Part 2 gives guidance on the conduct of licensing action reviews to NRC staff who review non-power reactor licensing applications. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination.

NONE

1996-02-01T23:59:59.000Z

22

DOE Announces Yucca Mountain License Application Schedule | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Yucca Mountain License Application Schedule Yucca Mountain License Application Schedule DOE Announces Yucca Mountain License Application Schedule July 19, 2006 - 3:13pm Addthis New Director Ward Sproat Testifies on Revised Timeline WASHINGTON, DC - The Department of Energy (DOE) today announced that it will submit a license application to the Nuclear Regulatory Commission (NRC) for a nuclear waste repository at Yucca Mountain, Nevada, no later than June 30, 2008. The Department also announced that if requested legislative changes are enacted, the repository will be able to accept spent nuclear fuel and high-level waste starting in early 2017. Announcing a schedule for submitting a license application is another step in the Department's mission to provide stability, clarity and predictability in moving the Yucca Mountain Project forward as quickly as

23

License Iso. CM35  

Office of Legacy Management (LM)

License Iso. CM35 License Iso. CM35 hUhUll4MhiM&POlltYll7~ llolh-thRqalStract Alolan&le, vlrghla Attoatlonl w. & 0. EutahlDon Pursuant to the Atanic Energy Act of 1954 and Section 40.21 or the Code of Federal Regulations, Title 10 - Atomic Energy, Chapter 1, Part 40 - Control of Sauce Haterid, you are hereby licensed to receive possession of and title to three hundred uwi l lght the term of this liceaee for pounda of refined eource material during 880 in meueb and demlopmt aotiritim MDool.atd lfltb fual oleroat f*hrlcmtlon. You are nirthcr licensed to transfer aad deliver poaaeeslon of and title to refined ecwce material to any person licensed by the Atcmlc Energy ~~slon, VitAin the limits of his license. i f Am a condition of iemzaace of thie llcenee, you are required to maintain

24

Research License Agreement Template  

NLE Websites -- All DOE Office Websites (Extended Search)

Research License Template Research License Template RESEARCH LICENSE Between Alliance for Sustainable Energy, LLC And [COMPANY or UNIVERSITY NAME] This License Agreement (hereinafter "Agreement"), which shall be effective on the date it is executed by the last Party to sign (the "Effective Date"), is between Alliance for Sustainable Energy, LLC (hereinafter "Alliance"), Management and Operating Contractor for the National Renewable Energy Laboratory (hereinafter "NREL") located at 1617 Cole Blvd., Golden, Colorado 80401 and [COMPANY or UNIVERSITY NAME], (hereinafter "Research Licensee"), a [FOR-PROFIT or NON-PROFIT] entity organized and existing under the laws of the State of [NAME of STATE] and having a principal place of business at [ADDRESS], hereinafter referred

25

Corrective Action Investigation Plan for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada (December 2002, Revision No.: 0), Including Record of Technical Change No. 1  

SciTech Connect

The Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 204 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 204 is located on the Nevada Test Site approximately 65 miles northwest of Las Vegas, Nevada. This CAU is comprised of six Corrective Action Sites (CASs) which include: 01-34-01, Underground Instrument House Bunker; 02-34-01, Instrument Bunker; 03-34-01, Underground Bunker; 05-18-02, Chemical Explosives Storage; 05-33-01, Kay Blockhouse; 05-99-02, Explosive Storage Bunker. Based on site history, process knowledge, and previous field efforts, contaminants of potential concern for Corrective Action Unit 204 collectively include radionuclides, beryllium, high explosives, lead, polychlorinated biphenyls, total petroleum hydrocarbons, silver, warfarin, and zinc phosphide. The primary question for the investigation is: ''Are existing data sufficient to evaluate appropriate corrective actions?'' To address this question, resolution of two decision statements is required. Decision I is to ''Define the nature of contamination'' by identifying any contamination above preliminary action levels (PALs); Decision II is to ''Determine the extent of contamination identified above PALs. If PALs are not exceeded, the investigation is completed. If PALs are exceeded, then Decision II must be resolved. In addition, data will be obtained to support waste management decisions. Field activities will include radiological land area surveys, geophysical surveys to identify any subsurface metallic and nonmetallic debris, field screening for applicable contaminants of potential concern, collection and analysis of surface and subsurface soil samples from biased locations, and step-out sampling to define the extent of contamination, as necessary. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

NNSA /NSO

2002-12-12T23:59:59.000Z

26

NETL Partnership and Licensing Agreements  

NLE Websites -- All DOE Office Websites (Extended Search)

Partnerships and Licensing Options Available Technologies Partnerships and Licensing Success Stories Contact Us Cooperative Research and Development Agreement (CRADA) A CRADA...

27

Nuclear Regulatory Commission Regulatory and Licensing Matters | Department  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Commission Regulatory and Licensing Matters Regulatory Commission Regulatory and Licensing Matters Nuclear Regulatory Commission Regulatory and Licensing Matters GC-52 provides legal advice to DOE regarding Nuclear Regulatory Commission (NRC) regulatory and licensing matters of interest to DOE, either as an NRC license applicant or in connection with related authorities and responsibilities of DOE and NRC on nuclear material, nuclear waste, and nuclear nonproliferation matters. GC-52 attorneys provide advice and support on a variety of NRC matters including regulation and licensing of DOE independent spent fuel storage facilities (ISFSIs) and a mixed-oxide fuel fabrication facility, consultation with NRC on certain DOE waste determinations, and imports and exports of nuclear materials and radioactive sealed sources.

28

GRR/Section 12-HI-a - Habitat Conservation Plan and Incidental Take License  

Open Energy Info (EERE)

2-HI-a - Habitat Conservation Plan and Incidental Take License 2-HI-a - Habitat Conservation Plan and Incidental Take License < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 12-HI-a - Habitat Conservation Plan and Incidental Take License 12HIAHabitatConservationPlanAndIncidentalTakeLicense (3).pdf Click to View Fullscreen Contact Agencies Hawaii Department of Land and Natural Resources Division of Forestry and Wildlife Regulations & Policies Hawaii Revised Statutes 195D-21 Triggers None specified Click "Edit With Form" above to add content 12HIAHabitatConservationPlanAndIncidentalTakeLicense (3).pdf 12HIAHabitatConservationPlanAndIncidentalTakeLicense (3).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

29

IT Operational Oversight Committee Round #4: Software Licensing Strategies Team  

E-Print Network (OSTI)

, University Development Office Cliff Johnston* , Professor of Soil Chemistry, College of Agriculture Julie license purchasing and management. The team evaluated software purchasing and licensing information from a variety of sources that included data from central purchasing (i.e., SRM), credit card purchases (not

30

Argonne superconductor technology licensed  

Science Journals Connector (OSTI)

Argonne superconductor technology licensed ... American Superconductor Corp. of Cambridge, Mass., has obtained the exclusive rights to develop and market high-temperature superconductor technology developed at the Department of Energy's Argonne National Laboratory. ... The Argonne technology produces superconducting ceramic coatings by oxidizing an appropriate metallic precursor. ...

RON DAGANI

1988-10-17T23:59:59.000Z

31

Licensing Opportunity The Problem  

E-Print Network (OSTI)

Licensing Opportunity The Problem Small scale wind and water turbines (% and noise levels significantly reduced. All in all, the new generator increases the viability of low wind for small scale wind turbines". The Opportunity A significant body of intellectual property (IP) has been

Wirosoetisno, Djoko

32

Solar Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Contractor Licensing Solar Contractor Licensing Solar Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Heating & Cooling Commercial Heating & Cooling Solar Heating Buying & Making Electricity Water Heating Program Info State Florida Program Type Solar/Wind Contractor Licensing Provider Florida Solar Energy Industries Association Until 1994, Florida offered limited specialty licenses for residential solar hot water and pool heating, as well a general solar contractor's license. These specialty licenses have not been issued since that time, although people holding these licenses may renew them. The new solar contractor license defines a broader scope of work. With the new license, solar contractors have the authority to install, maintain and

33

20 - Licensing for nuclear power plant siting, construction and operation  

Science Journals Connector (OSTI)

Abstract: This chapter addresses the need for licensing of nuclear power plants, and how such licenses can be requested by an applicant and granted by a regulatory authority. The licensing process is country dependent, although based on the common principle that the applicant must demonstrate that the proposed nuclear power plant will comply with the established regulations, and that it will operate safely without undue risks to the health and safety of plant personnel, the population and the environment. During the construction and operational phases the regulatory authority ensures compliance with the the license conditions through evaluation, monitoring and inspection. The license may be a single document covering all the phases in the life of the plant, or a set of consecutive documents requested and issued for different phases, which may include design certification, site approval, design and construction, commissioning and operation, design changes during operation, life extension and, finally, decommissioning.

A. Alonso; S.K. Sharma; D.F. Torgerson

2012-01-01T23:59:59.000Z

34

Technology Licensing Contacts | Partnerships | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Administrative Specialist Technology Licensing radercd@ornl.gov (865) 241-0898 David Sims Commercialization Manager simsdl@ornl.gov (865) 241-3808 Biography Renae Speck Senior...

35

REVISION POLICY  

U.S. Energy Information Administration (EIA) Indexed Site

REVISION POLICY REVISION POLICY March 2007 Data are collected at the million cubic feet per month level and all calculations mentioned below are carried out at that precision. However, the data published in the Form EIA-914 Monthly Gas Production Report are rounded to the nearest 0.01 billion cubic feet per day (roughly 300 million cubic feet per month). Monthly estimates of gross production published in the Natural Gas Monthly at the national level are rounded to billion cubic feet and those for marketed production at the State level are rounded to million cubic feet. The prior month's production estimate will always be revised each month, when the production estimate for the latest data month is released. For example, a June estimate would be revised when a July estimate is released.

36

Revision notice  

NLE Websites -- All DOE Office Websites (Extended Search)

All Natural Gas Reports U.S. Crude Oil and Natural Gas Proved Reserves With Data for 2013 | Release Date: December 4, 2014 | Revision: December 19, 2014 Next Release Date: December...

37

Renewable Energy Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contractor Licensing Contractor Licensing Renewable Energy Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Solar Buying & Making Electricity Home Weatherization Water Heating & Cooling Commercial Heating & Cooling Heating Water Heating Wind Program Info State Oregon Program Type Solar/Wind Contractor Licensing Provider Department of Consumer and Business Services Oregon requires trade licenses for people installing solar energy equipment, and contractor licenses for the companies that do construction. Companies with an electrical contractor license may engage in the business of making electrical installations. Similarly a plumbing contractor license allows a company to engage in the business of making plumbing

38

Technologies Available for Licensing | Partnerships | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Licensing Technology Licensing How To License ORNL Technologies Licensing Guidelines NDA(s) and MTA(s) Sample Licensing Agreement Technology Innovation Program Technology Assistance Program Licensing Staff Search For Technologies Available Technologies Analytical Instrumentation Chemicals Detectors and Sensors Energy and Utilities Healthcare and Biology Information Technology and Communications Manufacturing Materials Security and Defense Transportation Licensing Opportunity Announcements Partnerships Home | Connect with ORNL | For Industry | Partnerships | Technology Licensing | Available Technologies SHARE Available Technologies One of the primary missions of the Technology Transfer Division is to move our intellectual property from the research facility to the commercial

39

Solar Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Contractor Licensing Solar Contractor Licensing Solar Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Solar Buying & Making Electricity Heating & Cooling Swimming Pool Heaters Water Heating Commercial Heating & Cooling Heating Program Info State Nevada Program Type Solar/Wind Contractor Licensing Provider Nevada State Contractors Board - Reno Nevada law requires that solar energy system installers be licensed by the Nevada State Contractors Board. Contractors may be licensed under License Classification C-37 (solar contracting for solar water heating and space heating and air conditioning). Contractors may also perform solar work under License Classification C-1* (plumbing and heating), sub-classification (d) for solar water heating installations, or

40

Vehicles - ORNL inverter licensed ... | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Vehicles - ORNL inverter licensed ... Oak Ridge start-up New Hybrid Technologies has licensed a power conversion technology developed by Gui-Jia Su of Oak Ridge National...

Note: This page contains sample records for the topic "include revised licensing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

DRAFT REVISION  

NLE Websites -- All DOE Office Websites (Extended Search)

Summary of Changes To Procedure 200.1-5 Records Disaster Prevention, Mitigation, and Recovery Procedure Revised Version Issued as P 200.1-5B LM Procedure 200.1-5, Records Disaster Prevention, Mitigation, and Recovery Procedure of 1/19/07, has undergone revisions. The procedure has been revised to reflect changes in definitions and formatting and updates to the attached Plan. Please replace LM Procedure 200.1-5A with LM Procedure 200.1-5B. The most recent and official controlled hard copy version of this document resides with LM's Directives Coordinator. An electronic version of the controlled document has been placed on the LM Intranet for employee use. Printed hard copies of this electronic version are considered uncontrolled documents.

42

DRAFT REVISION  

NLE Websites -- All DOE Office Websites (Extended Search)

4-1 4-1 Records Management Self-Assessment Revised Version Issued as P200.4-1B LM Procedure 200.4-1, Records Management Self-Assessment of 4/17/07, has undergone minor revisions. The procedure has been revised to reflect changes in definitions and formatting. Please replace LM Procedure 200.4-1A with LM Procedure 200.4-1B. The most recent and official controlled hard copy version of this document resides with LM's Directives Coordinator. An electronic version of the controlled document has been placed on the LM Intranet for employee use. Printed hard copies of this electronic version are considered uncontrolled documents. INITIATED BY: Office of Business Operations NO. OF PAGES/ATTACHMENTS: 8 pages, 2 attachments U.S. Department of Energy

43

DRAFT REVISION  

NLE Websites -- All DOE Office Websites (Extended Search)

Summary of Changes Summary of Changes to Procedure 243.1 Records Inventory Revised Version Issued as P 243.1B LM Procedure 243.1A, Records Inventory of 7/18/07, has undergone minor revisions. The procedure has been revised to reflect changes in definitions and formatting and to ensure the references cited and associated forms remain current. Please replace LM Procedure 243.1A with LM Procedure 243.1B. The most recent and official controlled hard copy version of this document resides with LM's Directives Coordinator. An electronic version of the controlled document has been placed on the LM Intranet for employee use. Printed hard copies of this electronic version are considered uncontrolled documents. INITIATED BY: Office of Business Operations NO. OF PAGES/ATTACHMENTS: 9 pages, 3 attachments

44

How to License Technologies | Partnerships | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Licensing Technology Licensing How To License ORNL Technologies Licensing Guidelines NDA(s) and MTA(s) Sample Licensing Agreement Technology Innovation Program Technology Assistance Program Licensing Staff Search For Technologies Available Technologies Licensing Opportunity Announcements Partnerships Home | Connect with ORNL | For Industry | Partnerships | Technology Licensing | How To License ORNL Technologies SHARE How To License ORNL Technologies Technology Evaluation The first step in the licensing process is for you to identify technologies of interest to you. As a starting point, you may wish to browse the available technologies or search using keywords and the ORNL InSpire Technology Search Engine. At any point in your search, please feel free to contact the commercialization manager identified for each technology or

45

Alternative Fuels Data Center: Ethanol License  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol License to Ethanol License to someone by E-mail Share Alternative Fuels Data Center: Ethanol License on Facebook Tweet about Alternative Fuels Data Center: Ethanol License on Twitter Bookmark Alternative Fuels Data Center: Ethanol License on Google Bookmark Alternative Fuels Data Center: Ethanol License on Delicious Rank Alternative Fuels Data Center: Ethanol License on Digg Find More places to share Alternative Fuels Data Center: Ethanol License on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol License Anyone who imports, exports, or supplies ethanol in the state of Wyoming must obtain an annual license from the Wyoming Department of Transportation. The fee for each license is $25. (Reference Wyoming

46

Application for Replacement of Certificates, Permits, or Licenses Page 1 of 4  

E-Print Network (OSTI)

Application for Replacement of Certificates, Permits, or Licenses Page 1 of 4 Revised: 12/10/2012 OMB Control No. 0648-0272 Expiration Date: 11/30/2015 APPLICATION FOR REPLACEMENT OF CERTIFICATES Person ID: 3. Business Mailing Address: [ ] Permanent or [ ] Temporary 4. Date of Birth or Date

47

ECOdriving - Widespread Implementation for Learner Drivers and Licensed  

Open Energy Info (EERE)

ECOdriving - Widespread Implementation for Learner Drivers and Licensed ECOdriving - Widespread Implementation for Learner Drivers and Licensed Drivers (ECOWILL) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: ECOdriving - Widespread Implementation for Learner Drivers and Licensed Drivers (ECOWILL) Agency/Company /Organization: Austrian Energy Agency Focus Area: Fuels & Efficiency Topics: Best Practices Website: www.ecodrive.org/ The ECOWILL project aims to reduce carbon emissions by up to 8 Mt until 2015 by boosting the application of eco-driving across Europe. The project will roll out training programs for licensed drivers in 13 European countries. ECOWILL also promotes the education of eco-driving for learner drivers. This website provides information about eco-driving, including country-specific activities.

48

Solar Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Contractor Licensing Solar Contractor Licensing Solar Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Solar Buying & Making Electricity Heating & Cooling Swimming Pool Heaters Water Heating Commercial Heating & Cooling Heating Program Info State Arizona Program Type Solar/Wind Contractor Licensing Provider Registrar of Contractors The Arizona Registrar of Contractors does not offer a general solar electric contractor license, but the state's C-11/L-11 electrical license covers solar electric installations. C-11 licenses are required for electrical work on residential property and L-11 licenses apply to commercial installations. Contractors can also acquire a K-11 license to work on both residential and commercial installations. The Arizona Registrar of Contractors does have a specific plumbing license

49

Revision History  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Revision History Revision History Rev. 0, August 2012 Original submittal for milestone M3FT-12SN0804032 (Sandia programmatic and classification review) Rev. 1, September 2012 Corrected transposition errors in costing tables; recalculated stainless steel overpacks to be carbon steel; corrected various editorial problems. (SAND2012-7979P) Rev. 2, November 2012 Performed peer review and retitled. Submittal for milestone M2FT-13SN0804031 (formerly milestone M2FT- 12SN0804031) (SAND2012-9737P) Unclassified Unlimited Release Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000.

50

Alternative Fuels Data Center: Alternative Fuel License  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Fuel Fuel License to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel License on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel License on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel License on Google Bookmark Alternative Fuels Data Center: Alternative Fuel License on Delicious Rank Alternative Fuels Data Center: Alternative Fuel License on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel License on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel License Any person acting as an alternative fuels dealer must hold a valid alternative fuel license and certificate from the Wisconsin Department of Administration. Except for alternative fuels that a dealer delivers into a

51

DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant August 15, 2008 - 3:15pm Addthis WASHINGTON, DC -The U.S. Department of Energy (DOE) and the U.S. Nuclear Regulatory Commission (NRC) today delivered to Congress the Next Generation Nuclear Plant (NGNP) Licensing Strategy Report which describes the licensing approach, the analytical tools, the research and development activities and the estimated resources required to license an advanced reactor design by 2017 and begin operation by 2021. The NGNP represents a new concept for nuclear energy utilization, in which a gas-cooled reactor provides process heat for any number of industrial applications including electricity production, hydrogen production, coal-to-liquids, shale oil

52

DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant August 15, 2008 - 3:15pm Addthis WASHINGTON, DC -The U.S. Department of Energy (DOE) and the U.S. Nuclear Regulatory Commission (NRC) today delivered to Congress the Next Generation Nuclear Plant (NGNP) Licensing Strategy Report which describes the licensing approach, the analytical tools, the research and development activities and the estimated resources required to license an advanced reactor design by 2017 and begin operation by 2021. The NGNP represents a new concept for nuclear energy utilization, in which a gas-cooled reactor provides process heat for any number of industrial applications including electricity production, hydrogen production, coal-to-liquids, shale oil

53

Licensing Opportunity Announcements | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Technology Licensing | Licensing Opportunity Announcements SHARE Licensing Opportunity Announcements UT-Battelle, LLC, acting under its Prime Contract No. ORNL Laboratory Director Signs New License Agreement DE-AC05-00OR22725 with the U.S. Department of Energy (DOE) for the management and operation of the Oak Ridge National Laboratory (ORNL), is posting notice of near-term license opportunities for technologies listed on this page and is requesting license applications from potential commercialization partners. ORNL will license these technologies in defined fields of use. License applications will be evaluated based on prospective partners' ability and commitment to successfully commercialize the technology, with a preference for United States-based

54

TECHNOLOGY LICENSE APPLICATION Office of Technology Transfer  

E-Print Network (OSTI)

Page 1 TECHNOLOGY LICENSE APPLICATION Office of Technology Transfer UT-Battelle, LLC (UT. One of the functions of UT-BATTELLE's Office of Technology Transfer is to negotiate license agreements

Pennycook, Steve

55

Alternative Fuels Data Center: Alternative Fuel License  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Fuel Fuel License to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel License on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel License on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel License on Google Bookmark Alternative Fuels Data Center: Alternative Fuel License on Delicious Rank Alternative Fuels Data Center: Alternative Fuel License on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel License on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel License Alternative fuel providers, bulk users, and retailers, or any person who fuels an alternative fuel vehicle from a private source that does not pay

56

Notice of Intent to Revise DOE O 457.1, Nuclear Counterterrorism  

Directives, Delegations, and Requirements

Intent is to revise DOE O 457.1 and include the content of DOE M 457.1-1 as appendices to the revised order.

2013-02-07T23:59:59.000Z

57

ADR Revised Policy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alternative Dispute Resolution Alternative Dispute Resolution AGENCY: Department of Energy. ACTION: Notice of Revised Policy Statement. SUMMARY: On October 24, 1995, the Department of Energy (DOE) published an interim Statement of Policy on Alternative Dispute Resolution (ADR) (60 FR 54482) to further its commitment to the use of ADR for resolving issues in controversy in a fair, timely, and cost efficient manner, and to comply with the Administrative Dispute Resolution Act (ADRA), 5 U.S.C. §571 et seq. Today, DOE publishes a revised Statement of Policy on Alternative Dispute Resolution to reaffirm its commitment to the use of ADR, including the use of Environmental Conflict Resolution (ECR) and other collaborative processes that may be utilized to prevent or avoid potential conflicts.

58

Property:FERC License | Open Energy Information  

Open Energy Info (EERE)

FERC License Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:FERCLicense&oldid610683...

59

Commercialization and Licensing | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Success Stories Success Stories Commercialization and Licensing Economic Development Industrial Partnerships Sponsored Research Partnerships Home | Connect with ORNL | For Industry | Partnerships | Success Stories | Commercialization and Licensing Success Stories Commercialization and Licensing 1-10 of 14 Results Prev 12 Next DNP Green Technology, Inc. Exclusively Licenses Patents Invented at Argonne National Laboratory and Oak Ridge National Laboratory March 09, 2010 - On March 9, 2010, UT-Battelle, LLC, UChicago Argonne, LLC, and DNP Green Technology, INC fully executed an exclusive license agreement for patents invented solely by Argonne National Laboratory and jointly by Oak Ridge National Laboratory (ORNL) and Argonne National Laboratory (ANL). GE-Reuter Stokes to Market SNS-Designed Electronics

60

Corrective Action Investigation Plan for Corrective Action Unit 214: Bunkers and Storage Areas Nevada Test Site, Nevada: Revision 0, Including Record of Technical Change No. 1 and No. 2  

SciTech Connect

This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 214 under the Federal Facility Agreement and Consent Order. Located in Areas 5, 11, and 25 of the Nevada Test Site, CAU 214 consists of nine Corrective Action Sites (CASs): 05-99-01, Fallout Shelters; 11-22-03, Drum; 25-99-12, Fly Ash Storage; 25-23-01, Contaminated Materials; 25-23-19, Radioactive Material Storage; 25-99-18, Storage Area; 25-34-03, Motor Dr/Gr Assembly (Bunker); 25-34-04, Motor Dr/Gr Assembly (Bunker); and 25-34-05, Motor Dr/Gr Assembly (Bunker). These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). The suspected contaminants and critical analyte s for CAU 214 include oil (total petroleum hydrocarbons-diesel-range organics [TPH-DRO], polychlorinated biphenyls [PCBs]), pesticides (chlordane, heptachlor, 4,4-DDT), barium, cadmium, chronium, lubricants (TPH-DRO, TPH-gasoline-range organics [GRO]), and fly ash (arsenic). The land-use zones where CAU 214 CASs are located dictate that future land uses will be limited to nonresidential (i.e., industrial) activities. The results of this field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the corrective action decision document.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

2003-05-16T23:59:59.000Z

Note: This page contains sample records for the topic "include revised licensing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

ADR Revised Policy | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Revised Policy Revised Policy ADR Revised Policy SUMMARY: On October 24, 1995, the Department of Energy (DOE) published an interim Statement of Policy on Alternative Dispute Resolution (ADR) (60 FR 54482) to further its commitment to the use of ADR for resolving issues in controversy in a fair, timely, and cost efficient manner, and to comply with the Administrative Dispute Resolution Act (ADRA), 5 U.S.C. §571 et seq. Today, DOE publishes a revised Statement of Policy on Alternative Dispute Resolution to reaffirm its commitment to the use of ADR, including the use of Environmental Conflict Resolution (ECR) and othercollaborative processes that may be utilized to prevent or avoid potential conflicts. ADR Revised Policy More Documents & Publications Microsoft Word - ADR Revised Policy82508Reformatted.doc

62

Archived Weekly Files, Revised, 1984 Forward EIA revises its first-round  

U.S. Energy Information Administration (EIA) Indexed Site

Weekly Coal Production> Archive of weekly and monthly coal production data Weekly Coal Production> Archive of weekly and monthly coal production data Archive weekly and monthly coal production -- revised and original estimates About coal production revision estimates EIA revises its weekly (and monthly) original estimates of state-level coal production using quarterly mine-level coal production data from the Mine Safety and Health Administration (MSHA) as soon as the data are available. This method guarantees that EIA’s revised coal production estimates for each past quarter conform with the MSHA survey data. The state level revised estimates include refuse coal. EIA uses this equation to revise its weekly coal production estimates: Revised weekly estimate (State A) = original EIA estimate (State A) x MSHA quarterly data (State A) ÷

63

Cumulative Revision Map  

E-Print Network (OSTI)

Unlike static documents, version-controlled documents are edited by one or more authors over a certain period of time. Examples include large scale computer code, papers authored by a team of scientists, and online discussion boards. Such collaborative revision process makes traditional document modeling and visualization techniques inappropriate. In this paper we propose a new visualization technique for version-controlled documents that reveals interesting authoring patterns in papers, computer code and Wikipedia articles. The revealed authoring patterns are useful for the readers, participants in the authoring process, and supervisors.

Kim, Seungyeon; Lebanon, Guy

2012-01-01T23:59:59.000Z

64

Radioisotope thermoelectric generator licensed hardware package and certification tests  

SciTech Connect

This paper presents the Licensed Hardware package and the Certification Test portions of the Radioisitope Themoelectric Generator Transportation System. This package has been designed to meet those portions of the {ital Code} {ital of} {ital Federal} {ital Regulations} (10 CFR 71) relating to ``Type B`` shipments of radioactive materials. The licensed hardware is now in the U. S. Department of Energy licensing process that certifies the packaging`s integrity under accident conditions. The detailed information for the anticipated license is presented in the safety analysis report for packaging, which is now in process and undergoing necessary reviews. As part of the licensing process, a full-size Certification Test Article unit, which has modifications slightly different than the Licensed Hardware or production shipping units, is used for testing. Dimensional checks of the Certification Test Article were made at the manufacturing facility. Leak testing and drop testing were done at the 300 Area of the U.S. Department of Energy`s Hanford Site near Richland, Washington. The hardware includes independent double containments to prevent the environmental spread of {sup 238}Pu, impact limiting devices to protect portions of the package from impacts, and thermal insulation to protect the seal areas from excess heat during accident conditions. The package also features electronic feed-throughs to monitor the Radioisotope Thermoelectric Generator`s temperature inside the containment during the shipment cycle. This package is designed to safely dissipate the typical 4,500 thermal watts produced in the largest Radioisotope Thermoelectric Generators. The package also contains provisions to ensure leak tightness when radioactive materials, such as a Radioisotope Thermoelectric Generator for the Cassini Mission, planned for 1997 by the National Aeronautics and Space Administration, are being prepared for shipment. (Abstract Truncated)

Goldmann, L.H.; Averette, H.S. [Westinghouse Hanford Company, P.O. Box 1970, M/S R3-86 or N1-32, Richland, Washington 99352 (United States)

1995-01-20T23:59:59.000Z

65

Revised Manuscript  

NLE Websites -- All DOE Office Websites (Extended Search)

channels include 13 normal and 14 non-normal parity states with E x 17 MeV. Only ten states have been seen directly in reaction or compound nucleus cross-section work....

66

The following revisions are included in this modification:  

NLE Websites -- All DOE Office Websites (Extended Search)

the common defense and security, andor jeopardizes protection of the facility or Site security interests. The following are examples of performance failures or performance...

67

Clean Fractionation: Technology Available for Licensing  

NLE Websites -- All DOE Office Websites (Extended Search)

Clean Fractionation Clean Fractionation National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov NREL is a national laboratory of the U.S. Department of Energy Offi ce of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. NREL/FS-7A1-43959 * October 2008 Printed with a renewable-source ink on paper containing at least 50% wastepaper, including 10% postconsumer waste. You'll find more technologies available for licensing on the NREL Technology Transfer Web site at www.nrel.gov/technologytransfer/. National Renewable Energy Laboratory Innovation for Our Energy Future Biorefinery production costs are driven Insolubles Wash Cellulose pulp Lignocellulosic feedstock Solubles

68

LOS ALAMOS NATIONAL LABORATORY - EXPRESS LICENSING PROGRAM  

NLE Websites -- All DOE Office Websites (Extended Search)

LOS ALAMOS NATIONAL LABORATORY - EXPRESS LICENSING PROGRAM LOS ALAMOS NATIONAL LABORATORY - EXPRESS LICENSING PROGRAM NON-EXCLUSIVE PATENT LICENSE AGREEMENT This Agreement between Los Alamos National Security, LLC ("LANS"), under its United States Department of Energy ("DOE") Contract No. DE-AC52-06NA25396, to manage and operate Los Alamos National Laboratory ("LANL"), and ______________________________________, a _____________________________ corporation Company Name ("LICENSEE") (State of Incorporation) having its principal place of business at: ________________________________________________________________________________________ (Company Address) is effective on the date of execution by the last signing Party and payment of the License Issue Fee

69

Licensing Technologies | Y-12 National Security Complex  

NLE Websites -- All DOE Office Websites (Extended Search)

at the time of execution of the license, reimbursement of patent costs, a "running royalty" payable periodically based upon product sales and a "minimum annual" royalty which...

70

revision:20090902 modified:20090903  

E-Print Network (OSTI)

871 revision:2009­09­02 modified:2009­09­03 A trichotomy of countable, stable, unsuperstable and DMS 0600940 and Israel Science Foundation Grant no. 242/03. Publica­ tion 871. 1 #12; 871 revision of formulas (see Definition 2.3). The origins of these 2 #12; 871 revision:2009­09­02 modified:2009

Shelah, Saharon

71

Revision Policy for EIA Weekly Underground Natural Gas Storage Estimates  

Weekly Natural Gas Storage Report (EIA)

April 26, 2005 April 26, 2005 This report consists of the following sections: General EIA Weekly Natural Gas Storage Report Revisions Policy - a description of how revisions to the Weekly Natural Gas Storage Report estimates may occur EIA Weekly Natural Gas Storage Report Policy to Allow Unscheduled Release of revisions - a description of the policy that will be implemented in the event of an out-of-cycle release Revisions to the Historical Database - a description of how revisions will be noted in the Historical database Revisions may be presented for the most recent estimates of working gas in storage under a number of circumstances that occur after release of the estimates. These include: I. A respondent revises previously submitted data (respondents are requested to submit revisions if the change is greater than 500 million

72

Technologies licensed | Y-12 National Security Complex  

NLE Websites -- All DOE Office Websites (Extended Search)

Technologies licensed Technologies licensed Technologies licensed Posted: July 16, 2012 - 3:49pm | Y-12 Report | Volume 9, Issue 1 | 2012 Rendering of Y-12's Access Rate Control System Wherever threatening situations arise, in-place security measures make the most of every second. On Feb. 8, a startup firm in Knoxville, Tenn., licensed two security-related technologies from the Y-12 National Security Complex that do just that. The technologies, which delay entrance to controlled-access areas, provide a security solution for various potential markets: commercial nuclear facilities, pharmaceutical manufacturers, correctional facilities and large sporting venues, as well as for other Department of Energy sites. Sustainable Environment Technologies, LLC (SET), licensed the Access Rate

73

AP1000{sup R} licensing and deployment in the United States  

SciTech Connect

In recent years, both domestic and foreign utilities have turned to the standardized Westinghouse AP1000 plant design in satisfying their near - and long-term - sustainable energy needs. As direct support to these actions, licensing the AP1000 design has played a significant role by providing one of the fundamental bases in clearing regulatory hurdles leading to the start of new plant construction. Within the U.S. alone, Westinghouse AP1000 licensing activities have reached unprecedented milestones with the approvals of both AP1000 Design Certification and Southern Company's combined construction permit and operating license (COL) application directly supporting the construction of two new nuclear plants in Georgia. Further COL application approvals are immediately pending for an additional two AP1000 plants in South Carolina. And, across the U.S. nuclear industry spectrum, there are 10 other COL applications under regulatory review representing some 16 new plants at 10 sites. In total, these actions represent the first wave of new plant licensing under the regulatory approval process since 1978. Fundamental to the Nuclear Regulatory Commission's AP1000 Design Certification is the formal recognition of the AP1000 passive safety design through regulatory acceptance rulemaking. Through recognition and deployment of the AP1000 Design Certification, the utility licensee / operator of this reactor design are now offered an opportunity to use a simplified 'one-step' combined license process, thereby managing substantial back-end construction schedule risk from regulatory and intervention delays. Application of this regulatory philosophy represents both acceptance and encouragement of standardized reactor designs like the AP1000. With the recent AP1000 Design Certification and utility COL acceptances, the fundamental licensing processes of this philosophy have successfully proven the attainment of significant milestones with the next stage licensing actions directed towards deployment. AP1000 Design Certification and COL deployment, and management of the plant construction in accordance with the conditions within these approvals, remain as significant site and corporate responsibilities. These licensing-construction integrated activities must now focus on identifying and resolving 'as-built' departures from the standardized design as assessed against the certified AP1000 technical and licensing basis. Within this paper, significant aspects of the AP1000 U.S. licensing will be discussed, including identifying systems and processes used in ensuring compliance while deploying the standardized design. Critical licensing steps, licensing deployment actions as plant construction progresses and defining the road forward to a successful completion of licensing actions will be addressed. (authors)

Jordan, R. P.; Russ, P. A.; Filiak, P. P.; Castiglione, L. L. [Westinghouse Electric Company LLC, 1000 Westinghouse Drive, Cranberry Township, PA 16066 (United States)

2012-07-01T23:59:59.000Z

74

Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Liquefied Petroleum Liquefied Petroleum Gas (Propane) License to someone by E-mail Share Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License on Facebook Tweet about Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License on Twitter Bookmark Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License on Google Bookmark Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License on Delicious Rank Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License on Digg Find More places to share Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Liquefied Petroleum Gas (Propane) License

75

Solar/Wind Contractor Licensing | Open Energy Information  

Open Energy Info (EERE)

Solar/Wind Contractor Licensing Solar/Wind Contractor Licensing < Solar Jump to: navigation, search Some states have established a licensing process for solar-energy contractors and/or wind-energy contractors. These requirements are designed to ensure that contractors have the necessary knowledge and experience to install systems properly. Solar licenses typically take the form of either a separate, specialized solar contractor's license, or a specialty classification under a general electrical or plumbing license. [1] Solar/Wind Contractor Licensing Incentives CSV (rows 1 - 24) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active Alternative Energy System Contracting (Virginia) Solar/Wind Contractor Licensing Virginia Installer/Contractor Photovoltaics No

76

U-047: Siemens Automation License Manager Bugs Let Remote Users...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Siemens Automation License Manager Bugs Let Remote Users Deny Service or Execute Arbitrary Code U-047: Siemens Automation License Manager Bugs Let Remote Users Deny Service or...

77

UDOT - Statewide Utility License Agreements | Open Energy Information  

Open Energy Info (EERE)

License Agreements Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: UDOT - Statewide Utility License Agreements Abstract This website links to UDOT...

78

2008 MERRTT Revision Letter  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 2, 2007 November 2, 2007 The U.S. Department of Energy (DOE) Transportation Emergency Preparedness Program (TEPP) is pleased to announce the release of the 2008 Modular Emergency Response Radiological Transportation Training (MERRTT). This revision replaces the 2005 MERRTT CD-ROM set. As required by the WIPP Land Withdrawal Act, the 2008 MERRTT has been sent to the Occupational, Safety and Health Administration (OSHA) for review. The 2008 version of MERRTT includes several enhancements, but the primary enhancement is the addition of the decontamination dress-down video. Comments received on the decontamination video script in the fall 2006 were incorporated into the script and the filming and final editing were completed in the spring 2007. The decontamination video was added to MERRTT to support the students'

79

Revised evaluations for ENDF/B-VI Revision 2  

SciTech Connect

The purpose of this paper is to report on revised cross-section evaluations for 17 nuclides that have been prepared for ENDF/B-VI Revision 2. The nuclides considered include five fission products and various isotopes of cadmium and hafnium. The previous ENDF/B-VI evaluations for these 17 nuclides were carried over from ENDF/B-V and were completed in the 1974--1980 time period. By utilizing the experimental data that have become available since 1980 the revised evaluations will result in significant improvements in the evaluated nuclear data files. The primary emphasis was placed on the resolved and unresolved resonance regions, but new experimental data were also used to improve the cross sections for energies above the unresolved resonance region. Negative elastic scattering cross sections were encountered in some of the previous evaluations; since the revised evaluations use multilevel Breit-Wigner (MLBW) parameters, rather than single-level Breit-Wigner (SLBW), this problem is eliminated.

Wright, R.Q.

1993-03-01T23:59:59.000Z

80

Technology Transfer: Success Stories: Licensed Technologies  

NLE Websites -- All DOE Office Websites (Extended Search)

Licensed Technologies Licensed Technologies Here are some of our licensees and the technologies they are commercializing; see our Start-Up Company page for more of our technology licenses. Company (Licensee) Technology Life Technologies Corp. Cell lines for breast cancer research Bristol Myers Squibb; Novartis; Plexxikon Inc.; Wyeth Research; GlaxoSmithKline; Johnson & Johnson; Boehringer Ingelheim Pharmaceuticals, Inc.; Genzyme Software for automated macromolecular crystallography Shell International Exploration and Production; ConnocoPhillips Company; StatOil ASA; Schlumburger Technology Corportation; BHP Billiton Ltd.; Chevron Energy Technology Company; EniTecnologie S.p.A. Geo-Hydrophysical modeling software Microsoft Home Energy Saver software distribution Kalinex Colorimetric bioassay

Note: This page contains sample records for the topic "include revised licensing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Sci Protek Signs Licensing Deal for Technology that Reduces Plant Disease |  

NLE Websites -- All DOE Office Websites (Extended Search)

Sci Protek Signs Licensing Deal for Technology that Reduces Plant Disease Sci Protek Signs Licensing Deal for Technology that Reduces Plant Disease January 06, 2011 A California based small business, Sci Proteck, Inc, has recently licensed technology developed at the Department of Energy's Oak Ridge National Laboratory (ORNL) and the University of Chicago (UChicago) to protect plants from crop diseases. Research on this new method for inducing plant pathogen resistance began in 2005 following a grant from the National Science Foundation and research support from the Office of Biological and Environmental Research of the U.S. Department of Energy. Principal developers include Timothy Tschaplinski at ORNL and Drs. Jean Greenberg and Ho Won Jung at the UChicago. ORNL and UChicago entered into an Inter-Institutional Agreement for licensing, patent prosecution, and royalty sharing.

82

2008 MERRTT Revision Letter | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 MERRTT Revision Letter 8 MERRTT Revision Letter 2008 MERRTT Revision Letter The 2008 version of MERRTT includes several enhancements, but the primary enhancement is the addition of the decontamination dress-down video. Comments received on the decontamination video script in the fall 2006 were incorporated into the script and the filming and final editing were completed in the spring 2007. The decontamination video was added to MERRTT to support the students' understanding of the decontamination dress-down process at an accident scene. Additional enhancements included the streamlining of objectives from the Terminology & Units and Assessing Package Integrity modules into other existing modules. 2008 MERRTT Revision Letter More Documents & Publications 2009 TEPP Annual Report

83

DEPARTMENT OF ENERGY NONEXCLUSIVE PATENT LICENSE APPLICATION  

Energy.gov (U.S. Department of Energy (DOE))

It is the policy of the U.S. Department of Energy (DOE) to accord licensed on DOE-owned patents applications in appropriate circumstances to applicants with satisfactory plans for development and...

84

Non -commercial License 1. INTENT/PURPOSE  

E-Print Network (OSTI)

licensee to commercialize the software or any derivative work of the software. 8. FEE/ROYALTY Licensee pays no royalty for non-commercial license Licensee and any third parties must enter a new agreement

Barthe, Loïc

85

Argument licensing and agreement in Zulu  

E-Print Network (OSTI)

In this thesis, I examine some core grammatical phenomena - case licensing, agreement, the EPP - through the lens of the Bantu language Zulu. Zulu has a number of remarkable and puzzling properties whose analysis affords ...

Halpert, Claire

2012-01-01T23:59:59.000Z

86

Consumption and meanings of team licensed merchandise  

Science Journals Connector (OSTI)

This study examined the motives driving the purchase of team licensed merchandise and the meanings embedded in those products. Data from 135 attendees at two National Football League (USA) games revealed that the primary motives for the display of team licensed merchandise were fans' desire to publicly show their affiliation with the team and to express their support for the organisation, while the need to belong in the group of team supporters was also a strong motive. Furthermore, study participants overwhelmingly attached symbolic meanings to their possessions, emphasising social relationships and connectedness as well as elements of personal history. To a lesser extent, experiential meanings were attached to team licensed products. This study makes original contributions to the relatively narrow in scope research on sport licensing by exploring the functional, experiential and symbolic meanings that create value for those products and for their owners.

Artemisia Apostolopoulou; Dimitra Papadimitriou; David Synowka; John S. Clark

2012-01-01T23:59:59.000Z

87

Alternative Fuels Data Center: Biodiesel Distributor License and  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Distributor Distributor License and Recordkeeping Requirements to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Distributor License and Recordkeeping Requirements on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Distributor License and Recordkeeping Requirements on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Distributor License and Recordkeeping Requirements on Google Bookmark Alternative Fuels Data Center: Biodiesel Distributor License and Recordkeeping Requirements on Delicious Rank Alternative Fuels Data Center: Biodiesel Distributor License and Recordkeeping Requirements on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Distributor License and Recordkeeping Requirements on AddThis.com... More in this section...

88

Solar Hot Water Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hot Water Contractor Licensing Hot Water Contractor Licensing Solar Hot Water Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Heating & Cooling Solar Water Heating Program Info State Arkansas Program Type Solar/Wind Contractor Licensing Arkansas offers several limited, specialty licenses for solar thermal installers under the general plumbing license. There are three specialty classifications available for solar thermal installers: a Restricted Solar Mechanic license, a Supervising Solar Mechanic license, and a Solar Mechanic Trainee classification. Installers with a Restricted Solar Mechanic license can install and maintain systems used to heat domestic hot water, but are not allowed to perform any other plumbing work. Individuals holding a Supervising Solar Mechanic license are able to supervise, install

89

Revision Policy for EIA Weekly Underground Natural Gas Storage Estimates  

Weekly Natural Gas Storage Report (EIA)

September 23, 2013 September 23, 2013 This report consists of the following sections: General EIA Weekly Natural Gas Storage Report Revisions Policy - a description of how revisions to the Weekly Natural Gas Storage Report estimates may occur EIA Weekly Natural Gas Storage Report Policy to Allow Unscheduled Release of revisions - a description of the policy that will be implemented in the event of an out-of-cycle release Revisions to the Historical Database - a description of how revisions will be noted in the Historical database The U.S. Energy Information Administration (EIA) is announcing changes Revisions may be presented for the most recent estimates of working gas in storage under a number of circumstances that occur after release of the estimates. These include: I. A respondent revises previously submitted data (respondents are

90

Alternative Fuels Data Center: Natural Gas and Propane Retailer License  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Retailer License to someone by E-mail Retailer License to someone by E-mail Share Alternative Fuels Data Center: Natural Gas and Propane Retailer License on Facebook Tweet about Alternative Fuels Data Center: Natural Gas and Propane Retailer License on Twitter Bookmark Alternative Fuels Data Center: Natural Gas and Propane Retailer License on Google Bookmark Alternative Fuels Data Center: Natural Gas and Propane Retailer License on Delicious Rank Alternative Fuels Data Center: Natural Gas and Propane Retailer License on Digg Find More places to share Alternative Fuels Data Center: Natural Gas and Propane Retailer License on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Natural Gas and Propane Retailer License Compressed natural gas, liquefied natural gas, or liquefied petroleum gas

91

T-564: Vulnerabilities in Citrix Licensing administration components |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Vulnerabilities in Citrix Licensing administration 4: Vulnerabilities in Citrix Licensing administration components T-564: Vulnerabilities in Citrix Licensing administration components February 24, 2011 - 7:00am Addthis PROBLEM: Vulnerabilities in Citrix Licensing administration components. PLATFORM: Citrix Licensing Administration Console, formerly known as the License Management Console. ABSTRACT: The vulnerabilities impact all current versions of the Citrix Licensing Administration Console, formerly known as the License Management Console. reference LINKS: Citrix ID:CTX128167 SecurityTracker Alert ID:1025123 Citrix Support IMPACT ASSESSMENT: Medium Discussion: Citrix has been made aware of a number of vulnerabilities in a third-party component that is used by the Citrix Licensing administration console. These vulnerabilities could potentially allow an unauthorized user to gain

92

License for the Konrad Deep Geological Repository  

SciTech Connect

Deep geological disposal of long-lived radioactive waste is currently considered a major challenge. Until present, only three deep geological disposal facilities have worldwide been operated: the Asse experimental repository (1967-1978) and the Morsleben repository (1971-1998) in Germany as well as the Waste Isolation Pilot Plant (WIPP) in the USA (1999 to present). Recently, the licensing procedure for the fourth such facility, the German Konrad repository, ended with a positive ''Planfeststellung'' (plan approval). With its plan approval decision, the licensing authority, the Ministry of the Environment of the state of Lower Saxony, approved the single license needed pursuant to German law to construct, operate, and later close down this facility.

Biurrun, E.; Hartje, B.

2003-02-24T23:59:59.000Z

93

2009 Revisions EIA-914  

Gasoline and Diesel Fuel Update (EIA)

for Texas, which was partially the cause for the review of the EIA-914, which, in turn, led to the development and implementation of this new methodology. Downward revisions in...

94

ENVIRONMENTAL ASSESSMENT FOR HYDROPOWER PILOT PROJECT LICENSE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FOR HYDROPOWER PILOT PROJECT LICENSE Admiralty Inlet Pilot Tidal Project-FERC Project No. 12690-005 (DOE/EA-1949) Washington Federal Energy Regulatory Commission Office of Energy Projects Division of Hydropower Licensing 888 First Street, NE Washington, DC 20426 U.S. Department of Energy Office of Energy Efficiency and Renewable Energy 1617 Cole Boulevard Golden, Colorado 80401 January 15, 2013 20130115-3035 FERC PDF (Unofficial) 01/15/2013 i TABLE OF CONTENTS LIST OF FIGURES ............................................................................................................ iv LIST OF TABLES............................................................................................................... v EXECUTIVE SUMMARY ................................................................................................

95

Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising  

Energy.gov (U.S. Department of Energy (DOE))

The number of vehicles in operation per licensed driver has risen steadily since 1950. In 1985, for the first time, there was one vehicle for every licensed driver. Since 1985, the number of...

96

Alternative Fuels Data Center: License Exemptions for Biodiesel Production  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

License Exemptions for License Exemptions for Biodiesel Production for Personal Use to someone by E-mail Share Alternative Fuels Data Center: License Exemptions for Biodiesel Production for Personal Use on Facebook Tweet about Alternative Fuels Data Center: License Exemptions for Biodiesel Production for Personal Use on Twitter Bookmark Alternative Fuels Data Center: License Exemptions for Biodiesel Production for Personal Use on Google Bookmark Alternative Fuels Data Center: License Exemptions for Biodiesel Production for Personal Use on Delicious Rank Alternative Fuels Data Center: License Exemptions for Biodiesel Production for Personal Use on Digg Find More places to share Alternative Fuels Data Center: License Exemptions for Biodiesel Production for Personal Use on AddThis.com...

97

NASA Partners License Nanotube Technology for Commercial Use...  

NLE Websites -- All DOE Office Websites (Extended Search)

prnewswire.comnews-releasesnasa-partners-license-nanotube-technology-for-commercial-use-149724205.html Submitted: Monday, April 3...

98

Human Factors Engineering Program Review Model (NUREG-0711)Revision 3: Update Methodology and Key Revisions  

SciTech Connect

The U.S. Nuclear Regulatory Commission (NRC) reviews the human factors engineering (HFE) programs of applicants for nuclear power plant construction permits, operating licenses, standard design certifications, and combined operating licenses. The purpose of these safety reviews is to help ensure that personnel performance and reliability are appropriately supported. Detailed design review procedures and guidance for the evaluations is provided in three key documents: the Standard Review Plan (NUREG-0800), the HFE Program Review Model (NUREG-0711), and the Human-System Interface Design Review Guidelines (NUREG-0700). These documents were last revised in 2007, 2004 and 2002, respectively. The NRC is committed to the periodic update and improvement of the guidance to ensure that it remains a state-of-the-art design evaluation tool. To this end, the NRC is updating its guidance to stay current with recent research on human performance, advances in HFE methods and tools, and new technology being employed in plant and control room design. NUREG-0711 is the first document to be addressed. We present the methodology used to update NUREG-0711 and summarize the main changes made. Finally, we discuss the current status of the update program and the future plans.

OHara J. M.; Higgins, J.; Fleger, S.

2012-07-22T23:59:59.000Z

99

Utah Department of Health Bureau of Health Facility Licensing, Certification and Resident Assessment  

E-Print Network (OSTI)

Utah Department of Health Bureau of Health Facility Licensing, Certification and Resident of Utah Rule R432-31 (http://health.utah.gov/hflcra/forms.php) This is a physician order sheet based be effectively managed at current setting. ___ Limited additional interventions: Includes care above. May also

Tipple, Brett

100

Stephen Johnson Last revised November 2010  

E-Print Network (OSTI)

Stephen Johnson fonds Last revised November 2010 University of British Columbia Archives #12;Table Stephen Johnson fonds. ­ 1974-1984. 13 cm of textual records. Biographical Sketch Stephen Johnson of the projects with which Johnson was associated include Canadian Serial Directory, Journal of Canadian Library

Handy, Todd C.

Note: This page contains sample records for the topic "include revised licensing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Software License Agreement | Scientific and Technical Information Program  

Office of Scientific and Technical Information (OSTI)

License Agreement License Agreement Print page Print page Email page Email page U.S. Department of Energy Office of Scientific and Technical Information Energy Science and Technology Software Center As the Office of Scientific and Technical Information's (OSTI) Energy Science and Technology Software Center (ESTSC), we are authorized to license and distribute this software to you. Upon receipt of license fee and execution of this license, the herein identified computer software package (software and accompanying documentation) is licensed, on a non-exclusive basis, to the UNDERSIGNED for use ONLY at the site designated herein below, and is to be used in accordance with this license and with the special restrictions identified below or on the software package. DOE-funded modifications, enhancements, or conversions of this

102

revision:19960317 modified:19960317  

E-Print Network (OSTI)

restrict our­ self to certain concrete classes then we may be able to retain compactness. In this paper we375 revision:1996­03­17 modified:1996­03­17 Some Compact Logics ­ Results in ZFC Alan H. Mekler order logic is so strong that it fails to have nice model theoretic properties such as compactness

Shelah, Saharon

103

TO :Lyall E. Johnson, Chief Licensing Branch  

Office of Legacy Management (LM)

Lyall E. Johnson, Chief Lyall E. Johnson, Chief Licensing Branch ,,,_ i-.. FROM :Clifford K. Beck, Chief q q+. ., ,,/,j !i-/ I, v' Hazards Evaluation Branch ,: s~~p:~LLItma0~7c ~HEI-IICAL wows We have reviewed the letter of December 10, 1958, from Mallinckrodt Chemical Works, requesting amendment of License No. SNM-33 to permit pelleting operations on uranium enriched to 5% U-235 in a new facility at Hematite, Missouri. Batch sizes throughout the operations will not exceed limited safe masses as specified in Report K-1019, Part 4 (Deleted). Neither the diameter nor capacity of the storage hopper located above the feed hopper of the pelleting press is given. Either the diameter should be not over the limited safe dimension or positive means should be in effect to insure against more than a limited safe m&s in the

104

DOE NETL Intellectual Property Available for Licensing  

NLE Websites -- All DOE Office Websites (Extended Search)

18.12 18.12 DOE NETL Intellectual Property Available for Licensing Complete marketing summaries of the following technologies will be posted on the NETL Available Technologies page shortly. For additional information or to submit a license application, please contact techtransfer@netl.doe.gov. Technology Title and Brief Description Intellectual Property Status Metal oxide promoters for improving the reactivity and capacity of oxygen carriers for the chemical looping combustion process This invention provides an oxygen carrier comprised of a plurality of metal oxide particles in contact with a plurality of MgO promoter particles. The MgO promoter particles increase the reaction rate and oxygen utilization of the metal oxide when contacting with a gaseous hydrocarbon at a temperature greater than

105

Licensing : BioEnergy Science Center  

NLE Websites -- All DOE Office Websites (Extended Search)

Available for Licensing Available for Licensing As new inventions are disclosed from BESC researchers, we will post information about the inventions on this webpage. Use the search engine below to match your technology needs with BESC disclosures or view all technologies in a particular category by clicking on the category below. View all inventions Enter keywords in the box. Separate the words with a comma (,) for multiple keywords. GO Advanced Biofuels (1 Inventions) Bioconversion (2 Inventions) Biomass Grasses (7 Inventions) Trees (1 Inventions) Genetic Tools (9 Inventions) Biotechnology (9 Inventions) Imaging (2 Inventions) PreTreatment (2 Inventions) Adams, Michael A (2 Inventions) Albersheim, Ivana G. (1 Invention) Backe, Jason (1 Invention) Bar-Peled, Maor (1 Invention) Bhave, Ramesh R (2 Inventions)

106

Pump apparatus including deconsolidator  

DOE Patents (OSTI)

A pump apparatus includes a particulate pump that defines a passage that extends from an inlet to an outlet. A duct is in flow communication with the outlet. The duct includes a deconsolidator configured to fragment particle agglomerates received from the passage.

Sonwane, Chandrashekhar; Saunders, Timothy; Fitzsimmons, Mark Andrew

2014-10-07T23:59:59.000Z

107

Combined Construction and Operating License (COL)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Updates available at: http://www.nuclear.gov NEXT UPDATE - October 2012 Page 1 News Updates  The final ruling on the design certification for Mitsubishi Heavy Industries' APWR has been revised until 2015. Structural changes were made to the design by vendor, which requires a new seismic analysis to be performed. Because of this, the review schedule for the COL applications for Comanche Peak and North Anna has been delayed by approximately 18 months.  The final ruling on Areva's EPR design certification has been revised from June 2013 until the end of 2014. The change is to allow Areva to

108

HNF-37489-FP Revision  

Office of Scientific and Technical Information (OSTI)

HNF-37489-FP HNF-37489-FP Revision 0 Project Hanford Management Contractor foc the US. Deparbnsnt of Energy under Contract DE-ACO6-96RL13200 FLUOR, P.O. Box 1000 Richland, Washington Implementation of the Seismic Design Criteria for DOE-STD-I 189-2008, Appendix A HNF-37489-FP Revision 0 Implementation of the Seismic Design Criteria for DOE-STD-1189- 2008, Appendix A S. K. Omberg Fluor Government Group Date Published April 2008 To Be Presented at The Nuclear Renaissanm. Safety Analysls for the New Nuclear Age Energy Facility Contractow Group May 3 - 8,2008 Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management Pmject Hanford Management CcntractOr for the US. Department of Energy under Contract DE-AC0696RL132W FLUOR, P.O. Box I000

109

CRADA Order Revision  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CRADA Order Revision CRADA Order Revision Linda Field Patent Counsel Department of Energy Goal CRADA Order DOE O 483.1 CRADA Manual DOE M 483.1-1 CRADA Order DOE O XXXX.X Departmental Directive Program Types of Directives Policies Regulations Orders Notices Manuals Guides Technical Standards Departmental Directive Program Directives Life Cycle Development Coordination Implementation Review (Certification) Development Phase *Orders are uploaded to RevCom for review and comment by all affected parties *60 days to develop draft & submit to MA-90 *Solicits input from stakeholders ( incl. field, contractors, and/or program counsel) Coordination Phase *MA-90 parses directive & sets due dates for review & comment *HQ Directives Points of Contact (DPCs) *Have 45 days to submit official comments on behalf of their

110

Patents Licensing and Patent Waivers | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Patents Licensing and Patent Waivers Patents Licensing and Patent Waivers Patents Licensing and Patent Waivers Patent Licensing The DOE Invention Licensing Program provides information on licensing of DOE-owned inventions. Patent Waivers Patent Rights - Waiver Clause: This clause makes modifications to the Patent Rights clause of 48 C.F.R. 52.227-12 and should replace that clause in the contract when an advance waiver is granted. Petition form for advance waiver (PDF) to contractor of Government's title to inventions that may be made under a Government contract [42 U.S.C. 5908] [10 C.F.R. Part 784]. Petition form for waiver (PDF) to contractor of Government's title to an identified invention already made under a Government contract [42 U.S.C. 5908] [10 C.F.R. Part 784]. Patent Waiver Decisions:

111

City of Dubuque - Solar Thermal Licensing Requirement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Dubuque - Solar Thermal Licensing Requirement City of Dubuque - Solar Thermal Licensing Requirement City of Dubuque - Solar Thermal Licensing Requirement < Back Eligibility Construction Installer/Contractor Savings Category Heating & Cooling Solar Water Heating Program Info State Iowa Program Type Solar/Wind Contractor Licensing Provider City of Dubuque The City of Dubuque requires a Solar Thermal License in order for a person to install a solar thermal project on a home or business. The requirement does not apply to solar photovoltaics. The licensing requirement can be met one of two ways. An installer may be Solar Thermal Certified by the North American Board of Certified Energy Practitioners (NABCEP) or An installer may complete the Northeast Iowa Community College Solar Thermal Training Installers are also required to obtain a permit before altering or

112

City of Madison - Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Madison - Contractor Licensing of Madison - Contractor Licensing City of Madison - Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Heating & Cooling Commercial Heating & Cooling Solar Heating Water Heating Program Info State Wisconsin Program Type Solar/Wind Contractor Licensing Provider City of Madison Although the State of Wisconsin does not have any specific laws for contractors dealing with renewable energy, the City of Madison has issued rules for contractor licensing and equipment standards for solar thermal installations. In the City's Heating, Ventilating and Air Conditioning Code is a requirement for a Class A-4 license for "a person desiring to enter into the business of installing, altering or repairing active solar heating equipment" as well as fee and examination details. As a result of a

113

NEXT GENERATION NUCLEAR PLANT LICENSING BASIS EVENT SELECTION WHITE PAPER  

SciTech Connect

The Next Generation Nuclear Plant (NGNP) will be a licensed commercial high temperature gas-cooled reactor (HTGR) plant capable of producing the electricity and high temperature process heat for industrial markets supporting a range of end-user applications. The NGNP Project has adopted the 10 CFR 52 Combined License (COL) application process, as recommended in the Report to Congress, dated August 2008, as the foundation for the NGNP licensing strategy. NRC licensing of the NGNP plant utilizing this process will demonstrate the efficacy of licensing future HTGRs for commercial industrial applications. This white paper is one in a series of submittals that will address key generic issues of the COL priority licensing topics as part of the process for establishing HTGR regulatory requirements.

Mark Holbrook

2010-09-01T23:59:59.000Z

114

Argonne, Evigia finalize licensing agreement for next-gen RFID...  

NLE Websites -- All DOE Office Websites (Extended Search)

See related New RFID technology tracks and monitors nuclear materials Argonne, Evigia finalize licensing agreement for next-gen RFID sensor technology By Angela Hardin * July 16,...

115

LG Chem, Argonne sign licensing deal to make, commercialize advanced...  

NLE Websites -- All DOE Office Websites (Extended Search)

LG Chem, Argonne sign licensing deal to make, commercialize advanced battery material By Angela Hardin * January 6, 2011 Tweet EmailPrint Patented cathode technology will help...

116

Transformative Learning Experiences of Oklahoma Child Care Licensing Specialists.  

E-Print Network (OSTI)

??The purpose of this study was to understand and describe the transformational educational experiences of Oklahoma child care licensing workers who are currently or were (more)

Averill, Sherry Gale

2006-01-01T23:59:59.000Z

117

Vorbeck Materials Licenses Graphene-based Battery Technologies...  

NLE Websites -- All DOE Office Websites (Extended Search)

America Energy Storage Energy Storage Return to Search Vorbeck Materials Licenses Graphene-based Battery Technologies Pacific Northwest National Laboratory Testing materials in...

118

Electric Grid - Forecasting system licensed | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Electric Grid - Forecasting system licensed Location Based Technologies has signed an agreement to integrate and market an Oak Ridge National Laboratory technology that provides...

119

Sci Protek Signs Licensing Deal for Technology that Reduces Plant...  

NLE Websites -- All DOE Office Websites (Extended Search)

entered into an Inter-Institutional Agreement for licensing, patent prosecution, and royalty sharing. Based in Visalia, CA, Sci Protek, Inc. is a global leader in innovative and...

120

Cleanup of Nuclear Licensed Facility 57  

SciTech Connect

This summary describes the operations to clean up the equipment of the Nuclear Licensed Facility 57 (NLF 57). Due to the diversity of the research and development work carried out on the reprocessing of spent fuel in it, this installation is emblematic of many of the technical and organizational issues liable to be encountered in the final closure of nuclear facilities. The French atomic energy commission's center at Fontenay aux Roses (CEA-FAR) was created in 1946 to house pile ZOE. Laboratories for fuel cycle research were installed in existing buildings at the site. Work was later concentrated on spent fuel reprocessing, in a pilot workshop referred to as the 'Usine Pu'. In the early sixties, after the dismantling of these first generation facilities, a radiochemistry laboratory dedicated to research and development work on reprocessing was constructed, designated Building 18. During the same decade, more buildings were added: Building 54, storehouses and offices, Building 91, a hall and laboratories for chemical engineering research on natural and depleted uranium. Together, these three building constitute NLF 57. Building 18 architecture featured four similar modules. Each module had three levels: a sub-level consisting of technical galleries and rooms for the liquid effluent tanks, a ground floor and roof space in which the ventilation was installed. Offices, change rooms, four laboratories and a hall were situated on the ground floor. The shielded lines were installed in the laboratories and the halls. Construction of the building took place between 1959 and 1962, and its commissioning began in 1961. The research and development programs performed in NLF 57 related to studies of the reprocessing of spent fuel, including dry methods and the Purex process, techniques for the treatment of waste (vitrification, alpha waste decontamination, etc.) as well as studies and production of transuranic elements for industry and research. In addition to this work, the necessary methods of analysis for monitoring it were also developed. The research and development program finally ended on 30 June 1995. The NLF 57 cleanup program was intended to reduce the nuclear and conventional hazards and minimize the quantities of HLW and MLW during the subsequent dismantling work. To facilitate the organization of the cleanup work, it was divided into categories by type: - treatment and removal of nuclear material, - removal of radioactive sources, - treatment and removal of aqueous liquid waste, - treatment and removal of organic effluents, - treatment and removal of solid waste, - pumping out of the PETRUS tank, - flushing and decontamination of the tanks, - cleanup of Buildings 18 and 91/54. To estimate the cost of the operations and to monitor the progress of the work, an indicator system was put in place based on work units representative of the operation. The values of the work units were periodically updated on the basis of experience feedback. The cleanup progress is now 92% complete (06/12/31): - treatment and removal of nuclear material: 100%, - removal of radioactive sources: 100%, - treatment and removal of aqueous liquid waste: 64%, - treatment and removal of organic effluents: 87%, - treatment and removal of solid waste: 99%, - pumping out of the PETRUS tank: 69%, - flushing and decontamination of tank: 75%, - section cleaning of Buildings 18 and 91/: 90%. The DRSN/SAFAR is the delegated Project Owner for cleanup and dismantling operations. It is also the prime contractor for the cleanup and dismantling operations. SAFAR itself is responsible for operations relating to the CEA activity and those with technical risks (Removal of nuclear materials, Removal of radioactive sources, Pumping out plutonium and transuranic contaminated solvent and Flushing and decontamination of tanks and pipes). All other operations are sub-contracted to specialist companies. The NLF57 cleanup program as executed is capable of attaining activity levels compatible with a future dismantling operation using known and mastered techniques and producing a

Jeanjacques, Michel; Bremond, Marie Pierre; Marchand, Carole; Poyau, Cecile; Viallefont, Cecile; Gautier, Laurent; Masure, Frederic [Commissariat a l'Energie Atomique, Direction de l'Energie Nucleaire, Direction deleguee des Activites Nucleaires de Saclay, Departement des Reacteurs et des Services Nucleaires, Service d'Assainissement de Fontenay Aux Roses: 18, route du Panorama, BP6, 92265 Fontenay aux Roses Cedex (France)

2008-01-15T23:59:59.000Z

Note: This page contains sample records for the topic "include revised licensing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

DWPF waste form compliance plan (Draft Revision)  

SciTech Connect

The Department of Energy currently has over 100 million liters of high-level radioactive waste in storage at the Savannah River Site (SRS). In the late 1970`s, the Department of Energy recognized that there were significant safety and cost advantages associated with immobilizing the high-level waste in a stable solid form. Several alternative waste forms were evaluated in terms of product quality and reliability of fabrication. This evaluation led to a decision to build the Defense Waste Processing Facility (DWPF) at SRS to convert the easily dispersed liquid waste to borosilicate glass. In accordance with the NEPA (National Environmental Policy Act) process, an Environmental Impact Statement was prepared for the facility, as well as an Environmental Assessment of the alternative waste forms, and issuance of a Record of Decision (in December, 1982) on the waste form. The Department of Energy, recognizing that start-up of the DWPF would considerably precede licensing of a repository, instituted a Waste Acceptance Process to ensure that these canistered waste forms would be acceptable for eventual disposal at a federal repository. This report is a revision of the DWPF compliance plan.

Plodinec, M.J.; Marra, S.L.

1991-12-31T23:59:59.000Z

122

DWPF waste form compliance plan (Draft Revision)  

SciTech Connect

The Department of Energy currently has over 100 million liters of high-level radioactive waste in storage at the Savannah River Site (SRS). In the late 1970's, the Department of Energy recognized that there were significant safety and cost advantages associated with immobilizing the high-level waste in a stable solid form. Several alternative waste forms were evaluated in terms of product quality and reliability of fabrication. This evaluation led to a decision to build the Defense Waste Processing Facility (DWPF) at SRS to convert the easily dispersed liquid waste to borosilicate glass. In accordance with the NEPA (National Environmental Policy Act) process, an Environmental Impact Statement was prepared for the facility, as well as an Environmental Assessment of the alternative waste forms, and issuance of a Record of Decision (in December, 1982) on the waste form. The Department of Energy, recognizing that start-up of the DWPF would considerably precede licensing of a repository, instituted a Waste Acceptance Process to ensure that these canistered waste forms would be acceptable for eventual disposal at a federal repository. This report is a revision of the DWPF compliance plan.

Plodinec, M.J.; Marra, S.L.

1991-01-01T23:59:59.000Z

123

License Application Design Selection Report, REV 01. August 1999  

SciTech Connect

In December 1998, the U.S. Department of Energy (DOE) published the ''Viability Assessment of a Repository at Yucca Mountain'' (DOE 1998b). The Viability Assessment described a preliminary design of a potential repository at Yucca Mountain, Nevada, for disposal of spent nuclear fuel and high-level radioactive waste, and assessed the probable behavior of that repository design in the Yucca Mountain geologic setting. The report concluded that 'Yucca Mountain remains a promising site for a geologic repository and that work should proceed to support a decision in 2001 on whether to recommend the site to the President for development as a repository'. It also concluded that 'uncertainties remain about key natural processes, the preliminary design, and how the site and design would interact'. Recognizing that the design that was evaluated will be refined before a license application could be submitted, the Viability Aassesment notes that 'DOE is evaluating several design options and alternatives that could reduce existing uncertainty and improve the performance of the repository system'. During the preparation of the Viability Assessment, DOE asked the contractor for the Civilian Radioactive Waste Management Program to study alternative design concepts for a potential geologic repository for high-level radioactive waste at Yucca Mountain. The License Application Design Selection (LADS) project was initiated to conduct that study. The goal of the project was to develop and evaluate a diverse range of conceptual repository designs that work well in concert with the Yucca Mountain site and to recommend an initial design concept for the possible Site Recommendation and License Apllication. This report presents the results of the LADS project. The design process consisted of two phases. In Phase I, a series of basic design concepts (design alternatives) and components (design features) were analyzed for their potential value as elements of a repository design. In Phase II, these enhanced design alternatives were refined, screened for accepatable postclosure performance, and evaluated against a set of criteria addressing four broad aspects of the repository: performance demonstrability; flexibility; construction, operations and maintenance; and cost. Based on this evaluation, a conceptual design was recommended to DOE and could be characterized as a low thermal impact design. Included in the report is more in depth information regarding the basis of the recommendation, performance issues, benefits related to reduced uncertainties, construction/operational benefits, technical and programmatic flexibilty and cost impacts.

Hastings, C.R.

1999-08-30T23:59:59.000Z

124

Cognitive Single Carrier Systems: Joint Impact of Multiple Licensed Transceivers  

E-Print Network (OSTI)

Cognitive Single Carrier Systems: Joint Impact of Multiple Licensed Transceivers Kyeong Jin Kim of interference from multiple licensed transceivers on cognitive underlay single carrier systems is examined, and 3) interference power from the primary transmitters. For this cognitive underlay single carrier

Elkashlan, Maged

125

The B & W Owners` Group Generic License Renewal Program  

SciTech Connect

Since the late 1970s, the Babcock & Wilcox (B & W) Owners Group (BWOG) has sponsored significant activities that address technical, economic, and licensing issues to ensure that the B & W nuclear steam supply system (NSSS) power plants operate until the end of their current plant licensed life and to preserve the license renewal option. It should be no surprise that the BWOG decided in late 1992 to aggressively pursue a license renewal effort. This effort, the Generic License Renewal Program (GLRP), has over the past 18 months contributed significantly to the industry`s license renewal initiative. The GLRP was established as a project with a full-time management organization within the BWOG structure. Its primary objective was the development and demonstration of an integrated plant assessment (IPA) process that would meet the requirements of the License Renewal Rule, published by the US Nuclear Regulatory Commission (NRC) in December 1991. The BWOG consists of five utilities with plants of very similar design, operation, and age. The owners, along with technical support from B & W Nuclear Technologies, created a highly capable and effective team to address the elements of the license renewal rule. This paper presents the BWOG strategy from the beginning of the program, the accomplishments to date, and the current role of the BWOG GLRP.

Gill, R.L. Jr.

1994-12-31T23:59:59.000Z

126

Knowledge and abilities catalog for nuclear power plant operators: Boiling water reactors, Revision 1  

SciTech Connect

The Knowledge and Abilities Catalog for Nuclear Power Plant Operators: Boiling-Water Reactors (BWRs) (NUREG-1123, Revision 1) provides the basis for the development of content-valid licensing examinations for reactor operators (ROs) and senior reactor operators (SROs). The examinations developed using the BWR Catalog along with the Operator Licensing Examiner Standards (NUREG-1021) and the Examiner`s Handbook for Developing Operator Licensing Written Examinations (NUREG/BR-0122), will cover the topics listed under Title 10, Code of Federal Regulations, Part 55 (10 CFR 55). The BWR Catalog contains approximately 7,000 knowledge and ability (K/A) statements for ROs and SROs at BWRs. The catalog is organized into six major sections: Organization of the Catalog, Generic Knowledge and Ability Statements, Plant Systems grouped by Safety Functions, Emergency and Abnormal Plant Evolutions, Components, and Theory. Revision 1 to the BWR Catalog represents a modification in form and content of the original catalog. The K/As were linked to their applicable 10 CFR 55 item numbers. SRO level K/As were identified by 10 CFR 55.43 item numbers. The plant-wide generic and system generic K/As were combined in one section with approximately one hundred new K/As. Component Cooling Water and Instrument Air Systems were added to the Systems Section. Finally, High Containment Hydrogen Concentration and Plant Fire On Site evolutions added to the Emergency and Abnormal Plant Evolutions section.

NONE

1995-08-01T23:59:59.000Z

127

Solar and Wind Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar and Wind Contractor Licensing Solar and Wind Contractor Licensing Solar and Wind Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Heating & Cooling Commercial Heating & Cooling Solar Heating Buying & Making Electricity Water Heating Wind Program Info State Connecticut Program Type Solar/Wind Contractor Licensing Provider Connecticut Department of Consumer Protection The Connecticut Department of Consumer Protection (DCP) is authorized to issue licenses for solar-thermal work, solar-electric work and wind-electric work. "Solar thermal work" is defined as "the installation, erection, repair, replacement, alteration, or maintenance of active, passive and hybrid solar systems that directly convert ambient energy into heat or convey, store or distribute such ambient energy." Solar electricity

128

Los Alamos National Laboratory announces Express Licensing program  

NLE Websites -- All DOE Office Websites (Extended Search)

LANL announces Express Licensing program LANL announces Express Licensing program Los Alamos National Laboratory announces Express Licensing program With the launch of a new "Express Licensing" program, access to innovative technology invented at Los Alamos National Laboratory has gotten easier. August 1, 2013 The following sequence shows the formation of nanoFOAM technology developed at Los Alamos National Laboratory. NanoFOAMs are self-supporting nanoporous metal foams that have potential applications in oil-refining processes, filtration of liquid or airborne germs, rocket fuels or catalytic production of a range of products from ammonia to plastics. NanoFOAM is just one of many licensable technologies available at Los Alamos National Laboratory. The following sequence shows the formation of nanoFOAM technology developed

129

Successful Clean Coal Technology Licensed for Commercial Application |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Successful Clean Coal Technology Licensed for Commercial Successful Clean Coal Technology Licensed for Commercial Application Successful Clean Coal Technology Licensed for Commercial Application July 26, 2010 - 1:00pm Addthis Washington, DC - The U.S. Department of Energy (DOE) has received the first installment from a repayment agreement for the Liquid Phase Methanol (LPMEOH™) Process. A royalty license issued for the advanced methanol production system underscores the clean coal technology's presence in the commercial market. The DOE-funded LPMEOH Process, developed in collaboration with Air Products and Chemicals Inc., has been licensed to Woodland Biofuel Inc., who intends to use the technology to develop a wood-gasification process to produce methanol from wood-scrap. The first facility is planned in New York State.

130

Solar Hot Water Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Hot Water Contractor Licensing Solar Hot Water Contractor Licensing Solar Hot Water Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Heating & Cooling Solar Water Heating Program Info State Maine Program Type Solar/Wind Contractor Licensing In order to be eligible for Maine's solar thermal rebate program, systems must be installed by licensed plumbers who have received additional certification for solar thermal systems from the North American Board of Certified Energy Practitioners (NABCEP). The state solar thermal rebate program maintains a list of Efficiency Maine registered vendors/installers. In addition, Efficiency Maine has information for vendors interested in becoming registered and listed on the [http://www.efficiencymaine.com/at-home/registered-vendor-locator web

131

Biomass Potentials from California Forest and Shrublands Including Fuel  

E-Print Network (OSTI)

Biomass Potentials from California Forest and Shrublands Including Fuel Reduction Potentials-04-004 February 2005 Revised: October 2005 Arnold Schwarzenegger, Governor, State of California #12;Biomass Tiangco, CEC Bryan M. Jenkins, University of California #12;Biomass Potentials from California Forest

132

Proposed Revisions for Regents Policy  

E-Print Network (OSTI)

Proposed Revisions for Regents Policy: Faculty Tenure Arlene Carney Vice Provost for Faculty family friendliness for probationary period #12;Basis for Revisions of Faculty Tenure Policy · Changed definitions of Academic Freedom and Responsibility required changes in the tenure policy. · As more untenured

Amin, S. Massoud

133

REPORT NO. 6 revised fallout  

E-Print Network (OSTI)

predictions October 1964 Report of the FEDERAL RADIATION COUNCIL #12;REPORT NO. 6 revised fallout estimates estimate and does not change the 30-year and 70-year dose estimates made on the basis of the originalREPORT NO. 6 revised fallout estimates for 1964-1965 and verification of the 1963

134

Document: P1289 Category: Computing Technologies License Status: Available for licensing Texas Industry Cluster: Information and Computer Technology  

E-Print Network (OSTI)

controls · Interactive systems, such as bio-electrical prosthetics interfaces and real-time translationalInventors Document: P1289 Category: Computing Technologies License Status: Available for licensing By rethinking the design of an analog integrator, the system allows for processing of analog signals without

Lightsey, Glenn

135

Patent Protection and Licensing Procedure | BNL Technology  

NLE Websites -- All DOE Office Websites (Extended Search)

BNL Inventors BNL Inventors Patent Protection and Licensing Procedure TCP Staff Assignment - Invention Disclosures received by Intellectual Property Legal Group (IPLG) will be given a BNL number, and assigned to a specific TCP staff member for commercial assessment. Henceforth, the assigned staff member will be responsible for all commercialization actions relating to the docket. Assessment - The TCP staff member assigned to the docket will meet with the inventor(s). Together they will discuss the invention and make a preliminary evaluation of potential applications and possible markets. Based on commercial assessment and a preliminary novelty determination, the TCP staff will make a recommendation to the IPLG whether to patent the invention. The TCP's decision and relevant documents will be circulated

136

Combined Construction and Operating License (COL)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Updates available at: http://www.nuclear.gov NEXT UPDATE - April 2013 Page 1 News Updates  On October 22 Dominion Resources Inc. announced that it would close and decommission its Kewaunee Power Station located in Carlton, Wis. after failing to find a buyer for the plant. The company said that the plant closure was a purely economic decision resulting from low projected wholesale electricity prices. Power production will cease in the second quarter of 2013.  On November 20, 2012, the Department of Energy announced that it had selected the Generation mPower team as a recipient for Government cost-shared funding as part of its Small Modular Reactor Licensing Technical Support program. The Department also announced plans to issue a

137

TEAM 1 Drivers License.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

I I Core Status: new users must complete 2 training sessions and pass a sample exchange exam to work independently during Core sessions (regular work hours). Flex Status: core users must complete 5 Core sessions and pass a driving test to work during Flex sessions (evening and weekend hours). All TEAM I scheduling must be coordinated through Peter Ercius at PErcius@lbl.gov. You may only be assigned two sessions per month. CORE LICENSE TEST Safety  Understand emergency shutdown procedure  Understand potential X-ray hazards of the modified instrument and shielding  Read and understand the Low Dose Machine Authorization document  Recognize high voltage hazards with the TEAM stage  Demonstrate handling of column valves  Point out where emergency contact numbers are posted

138

SAFSTOR and License Renewal: Making Them Coexist  

SciTech Connect

The Indian Point Energy Center is located on the eastern shore of the Hudson River in the town of Buchanan, New York. It lies approximately thirty miles north of New York City, and thus, holds the distinction of being the closest nuclear facility to a major metropolitan area. Units 1 and 2 were constructed and operated by Consolidated Edison and Unit 3 was owned and operated by the New York State Power Authority. All three units are now owned and operated by Entergy Nuclear- Northeast. Indian Point Unit 1 was powered by a pressurized water reactor which operated with an authorized maximum steady state power level of 615 thermal megawatts until October 31, 1974. On June 19, 1980, the Commission issued an order revoking authority to operate the facility. Although 244 spent fuel assemblies were successfully shipped offsite to a spent fuel reprocessing facility, 160 assemblies remain in the Unit 1 spent fuel pool awaiting relocation to dry cask storage. Units 2 and 3 are also pressurized water reactors which each produce slightly in excess of 1,000 MWe. Since 1974, Unit 1 has been maintained in a Safe Store Mode (SAFSTOR). For the purposes of this document, the term 'SAFSTOR' is intended to mean 'Custodial SAFSTOR' as described in section 2.4.3 of NUREG 0586 (Final Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities (GEIS) as follows: 'Custodial SAFSTOR requires a minimum cleanup and decontamination effort initially, followed by a period of continuing care with the active protection systems (principally the ventilation system) kept in service throughout the storage period. Full-time onsite surveillance by operating and security forces is required to carry out radiation monitoring, to maintain the equipment, and to prevent accidental or deliberate intrusion into the facility and the subsequent exposure to radiation or the disposal of radioactivity beyond the confines of the facility'. The decision to enter SAFSTOR was based upon the immediate proximity of Unit 1 to the operating units and the fact that a number of Unit 1 systems are shared with Unit 2. Over the past few decades, additional Unit 1 space (primarily within the turbine building) has been cleaned out and is being used to support the operating Units. The original plan to maintain Unit 1 in a SAFSTOR condition until it could be safely dismantled along with Unit 2 at the end of the Unit 2 operating license in 2012, requires some level of re-thinking now that Units 2 and 3 are applying for renewal of their licenses with the desire to continue operation until the 2033 time frame. The remainder of this paper summarizes the inspections and assessments undertaken by Entergy to investigate and document the condition of Indian Point Unit 1 and the resulting steps taken to assure that it would not pose a threat to the license extension efforts being under taken by Units 2 and 3. In conclusion: the Entergy Indian Point management team has systematically undertaken an effort to ensure the Unit 1 SAFSTOR condition and has implemented programs and procedural controls which will assure that it will continue to be safely maintained and will not impact the continued safe operation of Units 2 and 3 during their license renewal period.

Henries, William PE [TLG Services, Inc. - An Entergy Company, 148 New Milford Road East, Bridgewater, CT06752 (United States)

2008-01-15T23:59:59.000Z

139

Notice, Revised Classified Information Nondisclosure Agreement...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice, Revised Classified Information Nondisclosure Agreement - July 2013 Notice, Revised Classified Information Nondisclosure Agreement - July 2013 August 29, 2013 - 4:19pm...

140

Miscellaneous States Coalbed Methane Proved Reserves Revision...  

U.S. Energy Information Administration (EIA) Indexed Site

Revision Decreases (Billion Cubic Feet) Miscellaneous States Coalbed Methane Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4...

Note: This page contains sample records for the topic "include revised licensing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

ADMINISTRATIVE RECORDS SCHEDULE 21:AUDIOVISUAL RECORDS (Revision...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AUDIOVISUAL RECORDS (Revision 1) ADMINISTRATIVE RECORDS SCHEDULE 21:AUDIOVISUAL RECORDS (Revision 1) This schedule covers audiovisual and related records created by or for...

142

MESON LISTINGS UNDER REVISION (FOR ENCODERS)  

NLE Websites -- All DOE Office Websites (Extended Search)

MESON LISTINGS UNDER REVISION MESON LISTINGS UNDER REVISION (FOR ENCODERS) This WWW page is designed so that encoders can get current Listings of encoded particles with the 'NODES' on the right-hand side of the page. Disclaimer These sections are private PDG files. Please do not quote or refer to them. The authors reserve the right to radically alter these non-completed sections from minute to minute. They are certainly not error free. Conservation Laws The List by Particle Code (includes hidden particle codes) The List in Book Order by Name Light Unflavored Mesons Summary Table Other Light Unflavored Mesons Strange Mesons Summary Table Charmed Mesons Summary Table Charmed, Strange Mesons Summary Table (c cbar) Mesons Summary Table (b bbar) Mesons Summary Table Non (q qbar) Candidates

143

NE-20 ACTION: SSDP Project Charter Revision CONCURRENCES RTG SYMBOL  

Office of Legacy Management (LM)

0 0 ACTION: SSDP Project Charter Revision CONCURRENCES RTG SYMBOL James W. Vaughan, Jr. N-923 Acting Assistant Secretary . for Nuclear Energy Murphi Attached for your signature is a revised Project Charter for the 1/ 86 Shippingport Station Decommissioning Project (SSDP). Since our original M determination in July that there was a need to revise the SSDP Charter, we N K23 have been in discussion with the Richland Operations Field Office (RL). INe Significant differences in management philosophy surfaced between RL and DeLaney Headquarters that required discussions up to and including the RL Manager DAE/86 and myself. I now feel that the revised Charter reflects a mutually acceptable working arrangement between the appropriate organizations. The RTGSYMBOL general roles and responsibilities defined in this Charter will facilitate

144

Revised (05/06)  

U.S. Energy Information Administration (EIA) Indexed Site

U.S. DEPARTMENT OF ENERGY OMB No. 1901-0260 U.S. DEPARTMENT OF ENERGY OMB No. 1901-0260 (Revised 03/12) Germantown, MD 20874-1290 Expires: General Information 1. Purpose Standard Remittance Advice (RA) form is a mandatory form designed to serve as the source document for entries into the Department's accounting records under Public Law 97-425 data from Purchasers concerning payment of their contribution to the Nuclear Waste Fund. 2. Who Shall Submit The RA must be submitted by Purchasers who signed the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste. Submit Copy 1, 2, and 3 to DOE, Energy Finance and Accounting Service Center and retain Copy 4.

145

Special Report on "Allegations of Conflict of Interest Regarding Licensing of PROTECT by Argonne National Laboratory"  

SciTech Connect

In February 2009, the Office of Inspector General received a letter from Congressman Mark Steven Kirk of Illinois, which included constituent allegations that an exclusive technology licensing agreement by Argonne National Laboratory was tainted by inadequate competition, conflicts of interest, and other improprieties. The technology in question was for the Program for Response Options and Technology Enhancements for Chemical/Biological Terrorism, commonly referred to as PROTECT. Because of the importance of the Department of Energy's technology transfer program, especially as implementation of the American Recovery and Reinvestment Act matures, we reviewed selected aspects of the licensing process for PROTECT to determine whether the allegations had merit. In summary, under the facts developed during our review, it was understandable that interested parties concluded that there was a conflict of interest in this matter and that Argonne may have provided the successful licensee with an unfair advantage. In part, this was consistent with aspects of the complaint from Congressman Kirk's constituent.

None

2009-08-01T23:59:59.000Z

146

OMB Circular A-76 (Revised)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EXECUTIVE OFFICE OF THE PRESIDENT EXECUTIVE OFFICE OF THE PRESIDENT OFFICE OF MANAGEMENT AND BUDGET WASHINGTON, DC 20503 May 29, 2003 CIRCULAR NO. A-76 (REVISED) TO THE HEADS OF EXECUTIVE DEPARTMENTS AND ESTABLISHMENTS SUBJECT: Performance of Commercial Activities 1. Purpose. This circular establishes federal policy for the competition of commercial activities. 2. Supersession. This circular supersedes Office of Management and Budget (OMB) Circular No. A-76 (Revised 1999), August 4, 1983; Circular No. A-76 Revised Supplemental Handbook (Revised 2000), March 1996; Office of Federal Procurement Policy Letter 92-1, "Inherently Governmental Functions," September 23, 1992; and OMB Transmittal Memoranda 1 through 25, Performance of Commercial Activities. 3. Authority. Reorganization Plan No. 2 of 1970 (31 U.S.C. § 1111); Executive Order 11541; the Office

147

FOR OFFICERS REVISED AND PUBLISHED  

E-Print Network (OSTI)

Council 2007 Revision HANOVER, NEW HAMPSHIRE #12;To Dartmouth Club Officers: The development) 646-2253 Career Services (603) 646-2215 Club Mailings, Lists, Changes (603) 646-3497 Club Scholarships ............................................................................................................................ 8 Public Information Chair

Lotko, William

148

GETEM Manuals and Revision Notes  

Energy.gov (U.S. Department of Energy (DOE))

Please refer to these manuals and revision notes prior to downloading and running theGeothermal Electricity Technology Evaluation Model (GETEM). Because this is a beta version, you are urged to...

149

Property:Permit/License Buildout (MW) | Open Energy Information  

Open Energy Info (EERE)

Permit/License Buildout (MW) Permit/License Buildout (MW) Jump to: navigation, search Property Name Permit/License Buildout (MW) Property Type String Pages using the property "Permit/License Buildout (MW)" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects/40MW Lewis project + 40 + MHK Projects/Algiers Light Project + 20 + MHK Projects/Anconia Point Project + 15 + MHK Projects/Ashley Point Project + 148 + MHK Projects/Avalon Tidal + 30 + MHK Projects/Avondale Bend Project + 18 + MHK Projects/BW2 Tidal + 3 + MHK Projects/Bar Field Bend + 94 + MHK Projects/Barfield Point + 114 + MHK Projects/Bayou Latenache + 50 + MHK Projects/Bondurant Chute + 152 + MHK Projects/Breeze Point + 198 + MHK Projects/Brilliant Point Project + 56 + MHK Projects/Brough Head Wave Farm + 200 +

150

Nuclear Power 2010 Program: Combined Construction and Operating License &  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power 2010 Program: Combined Construction and Operating Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report The Nuclear Power 2010 (NP 2010) Construction and Operating License/Design Certification (COL/DC) Demonstration program together with the financial incentives provided by the Energy Policy Act of 2005 are the two primary reasons why a number of license applications for new nuclear construction are before the NRC today, and why the first new nuclear plants in over 30 years are under construction in the United States. As with all significant endeavors, there are lessons to be learned from the

151

Photovoltaics at DOE's National Renewable Energy Laboratory License  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SOLAR ROOF-TOP LICENSE AGREEMENT KEY TERMS SOLAR ROOF-TOP LICENSE AGREEMENT KEY TERMS (Non-Recordable) FOR INSTALLATION AND OPERATION OF A SOLAR ROOF-TOP ELECTRIC GENERATING SYSTEM AT THE NATIONAL RENEWABLE ENERGY LABORATORY, RESEARCH SUPPORT FACILITY United States of America Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office THIS LICENSE AGREEMENT (License) is made as of the _____ day of August, 2009, by the UNITED STATES OF AMERICA, Department of Energy, Office of Energy Efficiency and Renewable Energy, Golden Field Office, hereinafter referred to as LICENSOR, and SunEdison Origination1, LLC, hereinafter referred to as LICENSEE. WHEREAS, the LICENSOR owns certain buildings located at the National Renewable Energy Laboratory (NREL) and in particular, [____________________] the address of which

152

Photovoltaics at DOE's National Renewable Energy Laboratory License  

NLE Websites -- All DOE Office Websites (Extended Search)

ROOF-TOP LICENSE AGREEMENT KEY TERMS ROOF-TOP LICENSE AGREEMENT KEY TERMS (Non-Recordable) FOR INSTALLATION AND OPERATION OF A SOLAR ROOF-TOP ELECTRIC GENERATING SYSTEM AT THE NATIONAL RENEWABLE ENERGY LABORATORY, RESEARCH SUPPORT FACILITY United States of America Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office THIS LICENSE AGREEMENT (License) is made as of the _____ day of August, 2009, by the UNITED STATES OF AMERICA, Department of Energy, Office of Energy Efficiency and Renewable Energy, Golden Field Office, hereinafter referred to as LICENSOR, and SunEdison Origination1, LLC, hereinafter referred to as LICENSEE. WHEREAS, the LICENSOR owns certain buildings located at the National Renewable Energy Laboratory (NREL) and in particular, [____________________] the address of which

153

Nuclear Power 2010 Program: Combined Construction and Operating License &  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Power 2010 Program: Combined Construction and Operating Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report The Nuclear Power 2010 (NP 2010) Construction and Operating License/Design Certification (COL/DC) Demonstration program together with the financial incentives provided by the Energy Policy Act of 2005 are the two primary reasons why a number of license applications for new nuclear construction are before the NRC today, and why the first new nuclear plants in over 30 years are under construction in the United States. As with all significant endeavors, there are lessons to be learned from the

154

DOE Marks Milestone in Submitting Yucca Mountain License Application |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marks Milestone in Submitting Yucca Mountain License Marks Milestone in Submitting Yucca Mountain License Application DOE Marks Milestone in Submitting Yucca Mountain License Application June 3, 2008 - 12:51pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced submittal of a license application (LA) to the U.S. Nuclear Regulatory Commission (NRC) seeking authorization to construct America's first repository for spent nuclear fuel and high-level radioactive waste at Yucca Mountain, Nevada. The 8,600 page application describes DOE's plan to safely isolate spent nuclear fuel and high-level radioactive waste in tunnels deep underground at Yucca Mountain, a remote ridge on federally controlled land in the Mojave Desert 90 miles northwest of Las Vegas. Currently, the waste is stored at 121 temporary locations in 39 states

155

DOE Signs Advanced Enrichment Technology License and Facility Lease |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Advanced Enrichment Technology License and Facility Lease Advanced Enrichment Technology License and Facility Lease DOE Signs Advanced Enrichment Technology License and Facility Lease December 8, 2006 - 9:34am Addthis Announces Agreements with USEC Enabling Deployment of Advanced Domestic Technology for Uranium Enrichment WASHINGTON, DC - U.S. Secretary of Energy Samuel W. Bodman today announced the signing of a lease agreement with the United States Enrichment Corporation, Inc. (USEC) for their use of the Department's gas centrifuge enrichment plant (GCEP) facilities in Piketon, OH for their American Centrifuge Plant. The Department of Energy (DOE) also granted a non-exclusive patent license to USEC for use of DOE's centrifuge technology for uranium enrichment at the plant, which will initiate the first successful deployment of advanced domestic enrichment technology in the

156

ENERGY COMMISSION APPL.lCATION FOR SOURCE MATERIAL LICENSE  

Office of Legacy Management (LM)

COMMISSION COMMISSION APPL.lCATION FOR SOURCE MATERIAL LICENSE Pursuant to the rcgu!ations in Title 10, Code of Federal Regulations, Chapter 1, Part 40, application is hereby made for a license to receive, possess, use, transfer, deliver or import into the United Stat-, source material for the activity or activities described. 1. (check ooa) 2. NAME OF APPLICANT W. R. GRACE 6 Co. 0 (a) New Iicense 0 (b) Amendment to License No.- Davison Chemical Division STA-422 3. Q (c) Renewal of Licensr No. 0 (d) Previous License No. Pompton Plains, N. J. 4. ST,.TE THE AOORESS(ES) AT WHICH SOURCE MATERIAL WILL BE POSSESSED OR USED 868 Black Oak Ridge Road, Wayne, fi. J. a*ocY s up/'l File IF 5. BUSINESS OR OCCUPATION I 6. (a) IF APPLICANT IS AN INDIVIDUAL. STATE CITIZENSHIP

157

Nalco and Argonne reach licensing agreement covering resin wafer technology  

Science Journals Connector (OSTI)

In the USA, Nalco Co has reached a licensing agreement with the US Department of Energy's (DOE) Argonne National Laboratory, covering its resin wafer electrodeionisation (RW-EDI) technology.

2011-01-01T23:59:59.000Z

158

DEPARTMENT OF ENERGY EXCLUSIVE OR PARTIALLY EXCLUSIVE PATENT LICENSE APPLICATION  

Energy.gov (U.S. Department of Energy (DOE))

It is the policy of the U.S. Department of Energy (DOE) to accord licenses on DOE-owned patents and patent applications in appropriate circumstances to applicants with satisfactory plans for...

159

Model and Analytic Processes for Export License Assessments  

SciTech Connect

This paper represents the Department of Energy Office of Nonproliferation Research and Development (NA-22) Simulations, Algorithms and Modeling (SAM) Program's first effort to identify and frame analytical methods and tools to aid export control professionals in effectively predicting proliferation intent; a complex, multi-step and multi-agency process. The report focuses on analytical modeling methodologies that alone, or combined, may improve the proliferation export control license approval process. It is a follow-up to an earlier paper describing information sources and environments related to international nuclear technology transfer. This report describes the decision criteria used to evaluate modeling techniques and tools to determine which approaches will be investigated during the final 2 years of the project. The report also details the motivation for why new modeling techniques and tools are needed. The analytical modeling methodologies will enable analysts to evaluate the information environment for relevance to detecting proliferation intent, with specific focus on assessing risks associated with transferring dual-use technologies. Dual-use technologies can be used in both weapons and commercial enterprises. A decision-framework was developed to evaluate which of the different analytical modeling methodologies would be most appropriate conditional on the uniqueness of the approach, data availability, laboratory capabilities, relevance to NA-22 and Office of Arms Control and Nonproliferation (NA-24) research needs and the impact if successful. Modeling methodologies were divided into whether they could help micro-level assessments (e.g., help improve individual license assessments) or macro-level assessment. Macro-level assessment focuses on suppliers, technology, consumers, economies, and proliferation context. Macro-level assessment technologies scored higher in the area of uniqueness because less work has been done at the macro level. An approach to developing testable hypotheses for the macro-level assessment methodologies is provided. The outcome of this works suggests that we should develop a Bayes Net for micro-level analysis and continue to focus on Bayes Net, System Dynamics and Economic Input/Output models for assessing macro-level problems. Simultaneously, we need to develop metrics for assessing intent in export control, including the risks and consequences associated with all aspects of export control.

Thompson, Sandra E.; Whitney, Paul D.; Weimar, Mark R.; Wood, Thomas W.; Daly, Don S.; Brothers, Alan J.; Sanfilippo, Antonio P.; Cook, Diane; Holder, Larry

2011-09-29T23:59:59.000Z

160

U-182: Microsoft Windows Includes Some Invalid Certificates | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

82: Microsoft Windows Includes Some Invalid Certificates 82: Microsoft Windows Includes Some Invalid Certificates U-182: Microsoft Windows Includes Some Invalid Certificates June 4, 2012 - 7:00am Addthis PROBLEM: A vulnerability was reported in Microsoft Windows. A remote user may be able to spoof code signing signatures. PLATFORM: Version(s): XP SP3, 2003 SP2, Vista SP2, 2008 SP2, 7 SP1, 2008 R2 SP1; and prior service packs ABSTRACT: The operating system includes some invalid intermediate certificates. The vulnerability is due to the certificate authorities and not the operating system itself. Reference Links: Security tracker ID 1027114 GENERIC-MAP-NOMATCH Vendor Advisory IMPACT ASSESSMENT: High Discussion: The invalid certificates and their thumbprints are: Microsoft Enforced Licensing Intermediate PCA: 2a 83 e9 02 05 91 a5 5f c6

Note: This page contains sample records for the topic "include revised licensing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Revised OMB Circular A-76 (Revised November 14, 2002)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OMB Circular A-76 Revision Comments OMB Circular A-76 Revision Comments DRAFT OMB CIRCULAR A-76 (NOVEMBER 14, 2002) REVIEW COMMENTS AND RECOMMENDATIONS GENERAL COMMENTS: The Department of Energy (DOE) supports the overarching goal of OMB Circular A-76 that agencies should obtain "the best deal to the Taxpayer." We also support revisions to the Circular that "Keep the Process Moving" with the end result being: Faster/Cheaper Competitions; Improved Performance and Measures; Enhanced/Expanded Competition; Fairness; Realizing Significant Savings; and the Redirection of Resources to Mission Critical Requirements. Upon review of the draft Circular, the Department believes the proposed changes to Circular reflect a general improvement over the current version. The Department does, however, have

162

Revised Continuing Appropriations Resolution, 2007, P.L. 110...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Revised Continuing Appropriations Resolution, 2007, P.L. 110-5 Revised Continuing Appropriations Resolution, 2007, P.L. 110-5 Policy Flash Revised Continuing Appropriations...

163

A Review of Criticality Accidents 2000 Revision  

SciTech Connect

Criticality accidents and the characteristics of prompt power excursions are discussed. Sixty accidental power excursions are reviewed. Sufficient detail is provided to enable the reader to understand the physical situation, the chemistry and material flow, and when available the administrative setting leading up to the time of the accident. Information on the power history, energy release, consequences, and causes are also included when available. For those accidents that occurred in process plants, two new sections have been included in this revision. The first is an analysis and summary of the physical and neutronic features of the chain reacting systems. The second is a compilation of observations and lessons learned. Excursions associated with large power reactors are not included in this report.

Thomas P. McLaughlin; Shean P. Monahan; Norman L. Pruvost; Vladimir V. Frolov; Boris G. Ryazanov; Victor I. Sviridov

2000-05-01T23:59:59.000Z

164

Revisions to the Proposal and Award Policies & Procedures Guide  

E-Print Network (OSTI)

Revisions to the Proposal and Award Policies & Procedures Guide Effective January 14, 2013 National Description should outline the general plan of work, including the broad design of activities to be undertaken;Project Description - Changed Language OLD The Project Description must describe, as an integral part

He, Chuan

165

License Stewardship Approach to Commercial Nuclear Power Plant Decommissioning  

SciTech Connect

The paper explores both the conceptual approach to decommissioning commercial nuclear facilities using a license stewardship approach as well as the first commercial application of this approach. The license stewardship approach involves a decommissioning company taking control of a site and the 10 CFR 50 License in order to complete the work utilizing the established trust fund. In conclusion: The license stewardship approach is a novel way to approach the decommissioning of a retired nuclear power plant that offers several key advantages to all parties. For the owner and regulators, it provides assurance that the station will be decommissioned in a safe, timely manner. Ratepayers are assured that the work will be completed for the price they already have paid, with the decommissioning contractor assuming the financial risk of decommissioning. The contractor gains control of the assets and liabilities, the license, and the decommissioning fund. This enables the decommissioning contractor to control their work and eliminates redundant layers of management, while bringing more focus on achieving the desired end state - a restored site. (authors)

Daly, P.T.; Hlopak, W.J. [Commercial Services Group, EnergySolutions 1009 Commerce Park, Oak Ridge, TN (United States)

2008-07-01T23:59:59.000Z

166

SEEPAGE MODEL FOR PA INCLUDING DRIFT COLLAPSE  

SciTech Connect

The purpose of this report is to document the predictions and analyses performed using the seepage model for performance assessment (SMPA) for both the Topopah Spring middle nonlithophysal (Tptpmn) and lower lithophysal (Tptpll) lithostratigraphic units at Yucca Mountain, Nevada. Look-up tables of seepage flow rates into a drift (and their uncertainty) are generated by performing numerical simulations with the seepage model for many combinations of the three most important seepage-relevant parameters: the fracture permeability, the capillary-strength parameter 1/a, and the percolation flux. The percolation flux values chosen take into account flow focusing effects, which are evaluated based on a flow-focusing model. Moreover, multiple realizations of the underlying stochastic permeability field are conducted. Selected sensitivity studies are performed, including the effects of an alternative drift geometry representing a partially collapsed drift from an independent drift-degradation analysis (BSC 2004 [DIRS 166107]). The intended purpose of the seepage model is to provide results of drift-scale seepage rates under a series of parameters and scenarios in support of the Total System Performance Assessment for License Application (TSPA-LA). The SMPA is intended for the evaluation of drift-scale seepage rates under the full range of parameter values for three parameters found to be key (fracture permeability, the van Genuchten 1/a parameter, and percolation flux) and drift degradation shape scenarios in support of the TSPA-LA during the period of compliance for postclosure performance [Technical Work Plan for: Performance Assessment Unsaturated Zone (BSC 2002 [DIRS 160819], Section I-4-2-1)]. The flow-focusing model in the Topopah Spring welded (TSw) unit is intended to provide an estimate of flow focusing factors (FFFs) that (1) bridge the gap between the mountain-scale and drift-scale models, and (2) account for variability in local percolation flux due to stochastic hydrologic properties and flow processes.

C. Tsang

2004-09-22T23:59:59.000Z

167

EIS-0226: Revised Draft Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Revised Draft Environmental Impact Statement 6: Revised Draft Environmental Impact Statement EIS-0226: Revised Draft Environmental Impact Statement Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center This EIS has been prepared in accordance with NEPA and SEQR to examine the potential environmental impacts of the range of reasonable alternatives to decommission and/or maintain long-term stewardship at WNYNSC. The alternatives analyzed in this Draft EIS include the Sitewide Removal Alternative, the Sitewide Close-In-Place Alternative, the Phased Decisionmaking Alternative (Preferred Alternative), and the No Action Alternative. The analysis and information contained in this EIS is intended to assist DOE and NYSERDA with the consideration of environmental impacts

168

Greensburg, Kansas: A Better, Greener Place to Live (Revised) (Brochure) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Greensburg, Kansas: A Better, Greener Place to Live (Revised) Greensburg, Kansas: A Better, Greener Place to Live (Revised) (Brochure) Greensburg, Kansas: A Better, Greener Place to Live (Revised) (Brochure) Content includes EERE subject matter and mentions DOE's role in rebuilding. The layout is designed to be used as a template for other cities in similar situations. 45086.pdf More Documents & Publications NREL Helps Greensburg Set the Model for Green Communities (Fact Sheet), Innovation: The Spectrum of Clean Energy Innovation, NREL (National Renewable Energy Laboratory) A Tale of Two Cities: Greensburg Rebuilds as a National Model for Green Communities (Fact Sheet), Energy Efficiency & Renewable Energy (EERE) Greensburg, Kansas: Building a Model Green Community, How Would You Rebuild a Town - Green? April 2009 (Brochure)

169

Greensburg, Kansas: A Better, Greener Place to Live (Revised) (Brochure) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Greensburg, Kansas: A Better, Greener Place to Live (Revised) Greensburg, Kansas: A Better, Greener Place to Live (Revised) (Brochure) Greensburg, Kansas: A Better, Greener Place to Live (Revised) (Brochure) Content includes EERE subject matter and mentions DOE's role in rebuilding. The layout is designed to be used as a template for other cities in similar situations. 45086.pdf More Documents & Publications A Tale of Two Cities: Greensburg Rebuilds as a National Model for Green Communities (Fact Sheet), Energy Efficiency & Renewable Energy (EERE) NREL Helps Greensburg Set the Model for Green Communities (Fact Sheet), Innovation: The Spectrum of Clean Energy Innovation, NREL (National Renewable Energy Laboratory) Greensburg, Kansas: Building a Model Green Community, How Would You Rebuild a Town - Green? April 2009 (Brochure)

170

EIS-0218: Revised Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Revision of the Record of Decision for a Nuclear Weapons Nonproliferation Revision of the Record of Decision for a Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel DOE has decided to extend the FRR SNF Acceptance Policy for an additional 10 years beyond its current expiration until May 12, 2016, for irradiation of eligible fuel, and until May 12, 2019, for fuel acceptance. DOE has also decided to include the Australian RRR as a reactor eligible to participate in the acceptance program. For the small amount of RRR fuel that would be added to 1996 estimates, DOE will continue limitations on shipment cask curie activity and will ensure that the upper limit estimate for the source term assumed in the FRR SNF EIS accident analysis will not be exceeded. EIS-0218-RevisedROD-2004.pdf More Documents & Publications

171

Department of Energy Files Motion to Withdraw Yucca Mountain License  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Files Motion to Withdraw Yucca Mountain Files Motion to Withdraw Yucca Mountain License Application Department of Energy Files Motion to Withdraw Yucca Mountain License Application March 3, 2010 - 12:00am Addthis WASHINGTON, D.C. - The U.S. Department of Energy today filed a motion with the Nuclear Regulatory Commission to withdraw the license application for a high-level nuclear waste repository at Yucca Mountain with prejudice. "President Obama is fully committed to ensuring that the Nation meets our long-term storage obligations for nuclear waste," said Department of Energy General Counsel Scott Blake Harris. "In light of the decision not to proceed with the Yucca Mountain nuclear waste repository, the President directed Secretary Chu to establish the Blue Ribbon Commission on America's

172

Air Permits, Licenses, Certifications (Maine) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Air Permits, Licenses, Certifications (Maine) Air Permits, Licenses, Certifications (Maine) Air Permits, Licenses, Certifications (Maine) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Maine Program Type Siting and Permitting Provider Department of Environmental Protection This program regulates and limits air emissions from a variety of sources within Maine through a statewide permitting program. Separate regulations exist for limiting emissions of nitrogen oxides (NOx), sulfur dioxide

173

NETL: News Release - Successful Clean Coal Technology Licensed for  

NLE Websites -- All DOE Office Websites (Extended Search)

6, 2010 6, 2010 Successful Clean Coal Technology Licensed for Commercial Application DOE Receives First Repayment for Liquid Phase Methanol Process Development Washington, DC - The U.S. Department of Energy (DOE) has received the first installment from a repayment agreement for the Liquid Phase Methanol (LPMEOH(tm)) Process. A royalty license issued for the advanced methanol production system underscores the clean coal technology's presence in the commercial market. The DOE-funded LPMEOH Process, developed in collaboration with Air Products and Chemicals Inc., has been licensed to Woodland Biofuel Inc., who intends to use the technology to develop a wood-gasification process to produce methanol from wood-scrap. The first facility is planned in New York State.

174

Argonne licenses diamond semiconductor discoveries to AKHAN Technologies |  

NLE Websites -- All DOE Office Websites (Extended Search)

licenses diamond semiconductor discoveries to AKHAN Technologies licenses diamond semiconductor discoveries to AKHAN Technologies By Joseph Bernstein * By Jared Sagoff * March 4, 2013 Tweet EmailPrint LEMONT, Ill. - The U.S. Department of Energy's Argonne National Laboratory announced today that the laboratory has granted AKHAN Technologies exclusive diamond semiconductor application licensing rights to breakthrough low-temperature diamond deposition technology developed by Argonne's Center for Nanoscale Materials (CNM). The Argonne-developed technology allows for the deposition of nanocrystalline diamond on a variety of wafer substrate materials at temperatures as low as 400 degrees Celsius. The combination of the Argonne's low-temperature diamond technology with AKHAN's Miraj Diamond(tm) process represents the state of the art in diamond semiconductor

175

Electrical Energy Producer's License Tax (Montana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Producer's License Tax (Montana) Energy Producer&#039;s License Tax (Montana) Electrical Energy Producer's License Tax (Montana) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Institutional Multi-Family Residential Systems Integrator Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Montana Program Type Fees Provider Montana Department of Revenue Each person or other organization engaged in the generation, manufacture, or production of electricity and electrical energy in the state of Montana,

176

Property:FERC License Docket Number | Open Energy Information  

Open Energy Info (EERE)

License Docket Number License Docket Number Jump to: navigation, search This is a property of type string. Pages using the property "FERC License Docket Number" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects/Admirality Inlet Tidal Energy Project + P-12690 + MHK Projects/Algiers Light Project + P-12848 + MHK Projects/Anconia Point Project + P-12928 + MHK Projects/Astoria Tidal Energy + P-12665 + MHK Projects/Avalon Tidal + P-14228 + MHK Projects/Avondale Bend Project + P-12866 + MHK Projects/BW2 Tidal + P-14222 + MHK Projects/Bar Field Bend + P-12942 + MHK Projects/Barfield Point + P-13489 + MHK Projects/Bayou Latenache + P-13542 + MHK Projects/Belair Project + P-13125 + MHK Projects/Bondurant Chute + P-13477 + MHK Projects/Breeze Point + P-13480 +

177

Nevada Revised Statutes | Open Energy Information  

Open Energy Info (EERE)

Revised Statutes Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Nevada Revised StatutesLegal Published NA Year Signed or Took...

178

Fermilab Engineering Manual Appendices Revision 1.0  

E-Print Network (OSTI)

Fermilab Engineering Manual Appendices Revision 1.0 Page 1 FERMI NATIONAL ACCELERATOR LABORATORY:__________________________ DATE:_________ REVISION NO.________ REVISION ISSUE DATE:____________ #12;Fermilab Engineering Manual ..................................... 166 #12;Fermilab Engineering Manual Appendices Revision 1.0 Page 3 A. REQUIREMENTS AND SPECIFICATIONS

Quigg, Chris

179

ENERGY STAR Guide for Licensed Professionals | ENERGY STAR Buildings &  

NLE Websites -- All DOE Office Websites (Extended Search)

Guide for Licensed Professionals Guide for Licensed Professionals Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition Research and reports Service and product provider (SPP) resources Success stories Target Finder

180

Cryogenic System Revised June 1994  

E-Print Network (OSTI)

Chapter 9. Cryogenic System Revised June 1994 9.1. Introduction 9.2. Heat Loads and Refrigeration Duties -- 175 -- #12; 176 Cryogenic System #12; Cryogenic System 177 9.3. Two Phase Helium Cooling 9.4. The Refrigerator and Control #12; 178 Cryogenic System 9.5. Cryogen Delivery and Control 9.6. Three Cooling

Brookhaven National Laboratory - Experiment 821

Note: This page contains sample records for the topic "include revised licensing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

(Revised May 25, 2012) Radioactivity  

E-Print Network (OSTI)

(Revised May 25, 2012) Radioactivity GOALS (1) To gain a better understanding of naturally-occurring. (3) To measure the amount of "background radiation" from natural sources. (4) To test whether and man-made radiation sources. (2) To use a Geiger-Mueller tube to detect both beta and gamma radiation

Collins, Gary S.

182

A Revision of the Genera Pelomyia Williston  

E-Print Network (OSTI)

A Revision of the Genera Pelomyia Williston and Masoniella Vockeroth (Diptera: Tethinidae) GEORGE A O G Y · N U M B E R 6 1 9 A Revision of the Genera Pelomyia Williston and Masoniella Vockeroth. Mathis. A Revision of the Genera Pelomyia Williston and Masoniella Vockeroth (Diptera: Tethinidae

Mathis, Wayne N.

183

DOE Considers Natural Gas Utility Service Options: Proposal Includes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Considers Natural Gas Utility Service Options: Proposal Considers Natural Gas Utility Service Options: Proposal Includes 30-mile Natural Gas Pipeline from Pasco to Hanford DOE Considers Natural Gas Utility Service Options: Proposal Includes 30-mile Natural Gas Pipeline from Pasco to Hanford January 23, 2012 - 12:00pm Addthis Media Contacts Cameron Hardy, DOE , (509) 376-5365, Cameron.Hardy@rl.doe.gov RICHLAND, WASH. - The U.S. Department of Energy (DOE) is considering natural gas transportation and distribution requirements to support the Waste Treatment Plant (WTP) and evaporator operations at the Hanford Site in southeastern Washington State. DOE awarded a task order worth up to $5 million to the local, licensed supplier of natural gas in the Hanford area, Cascade Natural Gas Corporation (Cascade). Cascade will support DOE and its Environmental

184

309 Building fire protection analysis and justification for deactivation of sprinkler system. Revision 1  

SciTech Connect

Provide a `graded approach` fire evaluation in preparation for turnover to Environmental Restoration Contractor for D&D. Scope includes revising 309 Building book value and evaluating fire hazards, radiological and toxicological releases, and life safety issues.

Conner, R.P.

1997-06-25T23:59:59.000Z

185

The use for frequency-consequence curves in future reactor licensing  

E-Print Network (OSTI)

The licensing of nuclear power plants has focused until now on Light Water Reactors and has not incorporated systematically insights and benefits from Probabilistic Risk Assessment (PRA). With the goal of making the licensing ...

Debesse, Laurne

2007-01-01T23:59:59.000Z

186

Fact #761: January 7, 2013 Smaller Share of Teenagers Have a Driver's License in 2010  

Energy.gov (U.S. Department of Energy (DOE))

In the 1980's, more than half of all teenagers 15 to 19 years old had a driver's license. But that has changed. Since 1995, less than half of that age group has a driver's license. In 2010, the...

187

Licensing sentence-internal readings in english: an experimental study  

Science Journals Connector (OSTI)

Adjectives of comparison (AOCs) like same, different and similar can compare two elements sentence-internally, i.e., without referring to any previously introduced element. This reading is licensed only if a semantically plural NP ... Keywords: Bayesian statistics, acceptability judgments, adjectives of comparison, distributivity, pluralities

Adrian Brasoveanu; Jakub Dotla?il

2011-12-01T23:59:59.000Z

188

LICENSE HISTORY MO.8 Petrolite Corporation, St. Louis  

Office of Legacy Management (LM)

30-051175, 081379. Loose H-3, I-131, P-32. l 24-10452-1, 103064. K66 R. R. Annand et al Multiple. . 70-621, 12-15-61, SNM license for 0.5 kg. of U-235, 93% enriched as a fuel...

189

Decision fusion for improved automatic license plate recognition  

Science Journals Connector (OSTI)

Automatic license plate recognition (ALPR) is a pattern recognition application of great importance for access, traffic surveillance and law enforcement. Therefore many studies are concentrated on creating new algorithms or improving their performance. ... Keywords: ALPR, decision fusion, licence plate, neural networks, pattern recognition, skeleton features

Cristian Molder; Mircea Boscoianu; Iulian C. Vizitiu; Mihai I. Stanciu

2009-02-01T23:59:59.000Z

190

Standard format and content acceptance criteria for the Material Control and Accounting (MC and A) Reform Amendment: 10 CFR Part 74, Subpart E. Revision 1  

SciTech Connect

In 1987 the NRC revised the material control and accounting requirements for NRC licensees authorized to possess and use a formula quantity (i.e., 5 formula kilograms or more) of strategic special nuclear material. Those revisions issued as 10 CFR 74.51-59 require timely monitoring of in-process inventory and discrete items to detect anomalies potentially indicative of material losses. Timely detection and enhanced loss localization capabilities are beneficial to alarm resolution and also for material recovery in the event of an actual loss. NUREG-1280 was issued in 1987 to present criteria that could be used by applicants, licensees, and NRC license reviewers in the initial preparation and subsequent review of fundamental nuclear material control (FNMC) plans submitted in response to the Reform Amendment. This document is also intended for both licensees and license reviewers with respect to FNMC plan revisions. General performance objectives, system capabilities, process monitoring, item monitoring, alarm resolution, quality assurance, and accounting are addressed. This revision to NUREG-1280 is an expansion of the initial edition, which clarifies and expands upon several topics and addresses issues identified under Reform Amendment implementation experience.

NONE

1995-04-01T23:59:59.000Z

191

RPP-RPT-42583 Revision  

Office of Scientific and Technical Information (OSTI)

RPP-RPT-42583 RPP-RPT-42583 Revision 0 Synthetic Sling Failure - Evaluations and Recommendations Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management Contractor for the U.S. Department of Energy Office of River Protection under Contract DE-AC27-08RV14800 Approved for Public Release; Further Dissemination Unlimited RPP-RPT-42583 Revision 0 Synthetic Sling Failure - Evaluations and Recommendations C. S. Henderson T. C. Mackey Washington River Protection Solutions Date Published October 2009 Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management Contractor for the U.S. Department of Energy Office of River Protection under Contract DE-AC27-08RV14800 ~. washington river ~ protectionso/utions P.O. Box 850 Richland, Washington Approved for Public Release; Further Dissemination Unlimited TRADEMARK

192

Meals included in Conference Registrations  

E-Print Network (OSTI)

Meals included in Conference Registrations Meals included as part of the cost of a conference the most reasonable rates are obtained. Deluxe hotels and motels should be avoided. GSA rates have been for Georgia high cost areas. 75% of these amounts would be $21 for non- high cost areas and $27 for high cost

Arnold, Jonathan

193

A process for reducing the licensing burden for new products containing depleted uranium.  

SciTech Connect

This report is intended to provide guidance on the process for petitioning the U.S. Nuclear Regulatory Commission (NRC) to initiate a rulemaking that could reduce the licensing burden for new products containing depleted uranium (DU), which are being investigated by the DU Uses Research and Development (R&D) Program at Oak Ridge National Laboratory (ORNL). The focus is on requirements of the NRC rulemaking process applicable to establishing new exemptions or general licenses for products and devices containing source material. NRC policies and guidance regarding such requirements are described, including a 1965 policy statement on approval of new exemptions for products containing radionuclides (''Federal Register'', Volume 30, page 3462 [30 FR 3462]; March 16, 1965) and Regulatory Guide 6.7, which addresses the contents of environmental reports that support rulemaking petitions seeking exemptions for radionuclide-containing products. Methodologies for calculating radiological and nonradiological impacts on human health (i.e., risks) associated with distributing, using, and disposing of DU-containing products are presented. Also, methodologies for completing assessments of the potential effects of accidents involving new DU-containing products and of product misuse are described. The report recommends that the U.S. Department of Energy formulate a regulatory plan for deployment of DU-containing products in areas that are not already radiologically controlled. Such a plan is needed because deployment of new DU-containing products may be difficult under existing NRC licensing requirements. To provide a basis for the regulatory plan, it is recommended that detailed assessments of the radiological and nonradiological risks of distributing, using, and disposing of DU-containing products be conducted. Such assessments should be initiated as soon as sufficient data are available from the ongoing DU Uses R&D Program at ORNL to support the analyses.

Ranek, N. L.; Kamboj, S.; Hartmann, H. M.; Avci, H.

2004-01-06T23:59:59.000Z

194

Final Safety Evaluation Report to license the construction and operation of a facility to receive, store, and dispose of 11e.(2) byproduct material near Clive, Utah (Docket No. 40-8989)  

SciTech Connect

The Final Safety Evaluation Report (FSER) summarizes the US Nuclear Regulatory Commission (NRC) staff`s review of Envirocare of Utah, Inc.`s (Envirocare`s) application for a license to receive, store, and dispose of uranium and thorium byproduct material (as defined in Section 11e.(2) of the Atomic Energy Act of 1954, as amended) at a site near Clive, Utah. Envirocare proposes to dispose of high-volume, low-activity Section 11e.(2) byproduct material in separate earthen disposal cells on a site where the applicant currently disposes of naturally occurring radioactive material (NORM), low-level waste, and mixed waste under license by the Utah Department of Environmental Quality. The NRC staff review of the December 23, 1991, license application, as revised by page changes dated July 2 and August 10, 1992, April 5, 7, and 10, 1993, and May 3, 6, 7, 11, and 21, 1993, has identified open issues in geotechnical engineering, water resources protection, radon attenuation, financial assurance, and radiological safety. The NRC will not issue a license for the proposed action until Envirocare adequately resolves these open issues.

Not Available

1994-01-01T23:59:59.000Z

195

GRR/Section 3-MT-d - Land Use License Process | Open Energy Information  

Open Energy Info (EERE)

d - Land Use License Process d - Land Use License Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-MT-d - Land Use License Process 03MTDLandUseLicenseProcess (1).pdf Click to View Fullscreen Contact Agencies Montana Department of Natural Resources & Conservation Regulations & Policies Surface Management Rule 36.25.103 Triggers None specified Click "Edit With Form" above to add content 03MTDLandUseLicenseProcess (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The land use license is intended to be used for short-term use of state-owned lands. This license may be used for casual use of the lands

196

Vehicle Technologies Office: Fact #574: June 8, 2009 Vehicles per Licensed  

NLE Websites -- All DOE Office Websites (Extended Search)

4: June 8, 2009 4: June 8, 2009 Vehicles per Licensed Driver Rising to someone by E-mail Share Vehicle Technologies Office: Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising on Facebook Tweet about Vehicle Technologies Office: Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising on Twitter Bookmark Vehicle Technologies Office: Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising on Google Bookmark Vehicle Technologies Office: Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising on Delicious Rank Vehicle Technologies Office: Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising on Digg Find More places to share Vehicle Technologies Office: Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising on AddThis.com... Fact #574: June 8, 2009

197

Waste acceptance criteria for the Waste Isolation Pilot Plant. Revision 4  

SciTech Connect

This Revision 4 of the Waste Acceptance Criteria (WAC), WIPP-DOE-069, identifies and consolidates existing criteria and requirements which regulate the safe handling and preparation of Transuranic (TRU) waste packages for transportation to and emplacement in the Waste Isolation Pilot Plant (WIPP). This consolidation does not invalidate any existing certification of TRU waste to the WIPP Operations and Safety Criteria (Revision 3 of WIPP-DOE--069) and/or Transportation: Waste Package Requirements (TRUPACT-II Safety Analysis Report for Packaging [SARP]). Those documents being consolidated, including Revision 3 of the WAC, currently support the Test Phase.

Not Available

1991-12-01T23:59:59.000Z

198

A commodity approach to aging management review of supports for license renewal  

SciTech Connect

10CFR Part 54 requires that nuclear power plant licensees who seek renewal of their operating licenses for an additional 20 years of operation (i.e., for a total operating life of 60 years) perform an Integrated Plant Assessment (IPA) on all systems, structures and components (SSCs) within the scope of license renewal. Baltimore Gas and Electric (BGE) and MPR Associates, Inc., have recently completed an aging management review of component supports for Calvert Cliffs Nuclear Power Plant (CCNPP). A commodity approach was used on the basis that component supports perform essentially the same function regardless of the system with which they are associated. This approach, i.e., treating component supports as commodities as opposed to performing the aging management review for each individual component support, resulted in a cost-effective approach for this portion of the IPA. An important feature of the aging management review of component support at CCNPP is the evaluation of the adequacy of existing programs to manage component support aging. Two major programs were included in the evaluation: the ASME Section 11 In-Service Inspection (ISI) Program, and CCNPP`s Seismic Verification Project to resolve USI A-46. The key role that these programs play in the overall aging management strategy for component supports, as well as the evaluation of other on-going activities which complete the aging management approach for component supports, are discussed.

Schlaseman, C.S. [MPR Associates, Inc., Washington, DC (United States); Tilden, B.M. [Baltimore Gas and Electric Co., MD (United States)

1996-09-01T23:59:59.000Z

199

Completion of decommissioning: Monitoring for site release and license termination  

SciTech Connect

To request termination of a license upon completion of dismantling or decommissioning activities, documenting any residual radioactivity to show that the levels are environmentally acceptable will be necessary. When the regulators approve the decommissioning plan, they establish what the release criteria for the decommissioned site will be at the time of the site release and license termination. The criteria are numeric guidelines for direct radiation in soils and on surfaces. If the regulatory body finds that the measured on-site values are below the guidelines, the site will be acceptable for unrestricted release (no radiological controls or future use). If areas are found above those values, more decontamination or cleanup of these areas may be required unless the regulatory body grants an exemption.

Boing, L.E.

1997-08-01T23:59:59.000Z

200

Sponsorship includes: Agriculture in the  

E-Print Network (OSTI)

Sponsorship includes: · Agriculture in the Classroom · Douglas County Farm Bureau · Gifford Farm · University of Nebraska Agricultural Research and Development Center · University of Nebraska- Lincoln Awareness Coalition is to help youth, primarily from urban communities, become aware of agriculture

Nebraska-Lincoln, University of

Note: This page contains sample records for the topic "include revised licensing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Proposed Revision of the Decay Heat Standard ANSI/ANS-5.1-2005  

SciTech Connect

The ANSI/ANS-5.1 [1] standard on decay heat in light water reactors is one of the most widely used standards for reactor design and safety analysis. The standard was last revised and issued in 2005. The 2005 revision included several important accomplishments, including incorporation of ENDF/B-VI nuclear data in the development of correction factors implemented in the standard, and revisions to the 'simplified method.' The status of the 2005 ANS-5.1 standard has been summarized previously [2]. Future revisions of the standard under consideration, as proposed by the working group, were to (a) improve the neutron capture effect specification, (b) include contributions from actinides not already addressed by the standard, and (c) specify values for the total recoverable decay energy Q for major fissionable elements. These items are carried over from recommendations by Dickens et al. [3] during development of the 1994 revision. The current working group has also identified the representation of decay heat uncertainties as an area for improvement. This paper discusses recent development activities to further improve and extend the utility of the ANS-5.1 decay heat standard. These developments are in progress, and this paper summarizes the status of the activities. The proposed revisions discussed in this paper are being considered by the working group for adoption in the next publication of the standard.

Gauld, Ian C [ORNL] [ORNL; Rapp, Michelle Brady [Pacific Northwest National Laboratory (PNNL)] [Pacific Northwest National Laboratory (PNNL); Schmittroth, F. [Oak Ridge National Laboratory (Retired)] [Oak Ridge National Laboratory (Retired); Wilson, W. [Los Alamos National Laboratory (LANL)] [Los Alamos National Laboratory (LANL)

2010-01-01T23:59:59.000Z

202

Implementation of Revision 19 of the TRUPACT-II Safety Analysis Report at Rocky Flats Environmental Technology Site  

SciTech Connect

The U.S. Nuclear Regulatory Commission on July 27, 2001 approved Revision 19 of the TRUPACT-II Safety Analysis Report (SAR) and the associated TRUPACT-II Authorized Methods for Payload Control (TRAMPAC). Key initiatives in Revision 19 included matrix depletion, unlimited mixing of shipping categories, a flammability assessment methodology, and an alternative methodology for the determination of flammable gas generation rates. All U.S. Department of Energy (DOE) sites shipping transuranic (TRU) waste to the Waste Isolation Pilot Plant (WIPP) were required to implement Revision 19 methodology into their characterization and waste transportation programs by May 20, 2002. An implementation process was demonstrated by the Rocky Flats Environmental Technology Site (RFETS) in Golden, Colorado. The three-part process used by RFETS included revision of the site-specific TRAMPAC, an evaluation of the contact-handled TRU waste inventory against the regulations in Revision 19, and design and development of software to facilitate future inventory analyses.

D'Amico, E.; O'Leary, J.; Bell, S.; Djordjevic, S.; Givens, C,; Shokes, T.; Thompson, S.; Stahl, S.

2003-02-25T23:59:59.000Z

203

EIS-0286: Notice of Revised Scope | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Revised Scope EIS-0286: Notice of Revised Scope Hanford Site Solid (Radioactive and Hazardous) Waste Program The U.S. Department of Energy (DOE) has decided to revise the...

204

DRAFT NISTIR 7628 Revision 1 Guidelines for  

E-Print Network (OSTI)

DRAFT NISTIR 7628 Revision 1 Guidelines for Smart Grid Cyber Security: Vol. 3, Supportive Analyses Revision 1 Guidelines for Smart Grid Cyber Security: Vol. 3, Supportive Analyses and References The Smart as technology advances and as threats to grid security inevitably multiply and diversif

205

REVISED HYDROGEN SULFIDE DRILLING CONTINGENCY PLAN  

E-Print Network (OSTI)

REVISED HYDROGEN SULFIDE DRILLING CONTINGENCY PLAN OCEAN DRILLING PROGRAM TEXAS A&M UNIVERSITY;PREFACE Attached is the "REVISED HYDROGEN SULFIDE DRILLING CONTINGENCY PLAN" that will be used for ODP coring and drilling operations on legs where hydrogen sulfide is likely to be encountered. Prior

206

Appendix F Cultural Resources, Including  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Appendix F Appendix F Cultural Resources, Including Section 106 Consultation STATE OF CALIFORNIA - THE RESOURCES AGENCY EDMUND G. BROWN, JR., Governor OFFICE OF HISTORIC PRESERVATION DEPARTMENT OF PARKS AND RECREATION 1725 23 rd Street, Suite 100 SACRAMENTO, CA 95816-7100 (916) 445-7000 Fax: (916) 445-7053 calshpo@parks.ca.gov www.ohp.parks.ca.gov June 14, 2011 Reply in Reference To: DOE110407A Angela Colamaria Loan Programs Office Environmental Compliance Division Department of Energy 1000 Independence Ave SW, LP-10 Washington, DC 20585 Re: Topaz Solar Farm, San Luis Obispo County, California Dear Ms. Colamaria: Thank you for seeking my consultation regarding the above noted undertaking. Pursuant to 36 CFR Part 800 (as amended 8-05-04) regulations implementing Section

207

EIS-0200: Revision to the Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

has now decided to transfer approximately 27 cubic meters of has now decided to transfer approximately 27 cubic meters of transuranic (TRU) waste from a portion of the Battelle Columbus Laboratory, the Battelle West Jefferson North Site (West Jefferson) in Columbus, Ohio, and approximately 9 cubic meters of TRU waste from the Energy Technology Engineering Center (ETEC) in Canoga Park, California, to the Hanford Site near Richland, Washington, for storage. DOE expects that this TRU waste will ultimately be shipped to the Waste Isolation Pilot Plant (WIPP) in New Mexico for disposal. The TRU waste will be shipped to Hanford from both sites in Type B truck-mounted shipping casks licensed by the U.S. Nuclear Regulatory Commission (NRC). DOE/EIS-0200, Revision to the Record of Decision for the Department of Energy's Waste Management Program: Treatment and Storage of Transuranic

208

U-047: Siemens Automation License Manager Bugs Let Remote Users Deny  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Siemens Automation License Manager Bugs Let Remote Users 7: Siemens Automation License Manager Bugs Let Remote Users Deny Service or Execute Arbitrary Code U-047: Siemens Automation License Manager Bugs Let Remote Users Deny Service or Execute Arbitrary Code November 29, 2011 - 9:00am Addthis PROBLEM: Siemens Automation License Manager Bugs Let Remote Users Deny Service or Execute Arbitrary Code. PLATFORM: Siemens Automation License Manager 500.0.122.1 ABSTRACT: Several vulnerabilities were reported in Siemens Automation License Manager. reference LINKS: SecurityTracker Alert ID: 1026354 Bugtraq Siemens Advisory Services IMPACT ASSESSMENT: Medium Discussion: A remote user can execute arbitrary code on the target system. A remote user can cause denial of service conditions. A remote user can send specially crafted *_licensekey commands to trigger a

209

Revised Davis-Bacon Wage Determinations for the Weatherization...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Revised Davis-Bacon Wage Determinations for the Weatherization Assistance Program Revised Davis-Bacon Wage Determinations for the Weatherization Assistance Program U.S. Department...

210

PG&E Reconductoring Project Biological Assessment (Revised) ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PG&E Reconductoring Project Biological Assessment (Revised) PG&E Reconductoring Project Biological Assessment (Revised) PG&E Reconductoring Project Biological Assessment (1216...

211

Revised Draft Guidance on Consideration of Greenhouse Gas Emissions...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Revised Draft Guidance on Consideration of Greenhouse Gas Emissions and Climate Change in NEPA Reviews Revised Draft Guidance on Consideration of Greenhouse Gas Emissions and...

212

CEQ Issues Revised Draft Guidance on Consideration of Greenhouse...  

Office of Environmental Management (EM)

Revised Draft Guidance on Consideration of Greenhouse Gas Emissions and the Effects of Climate Change in NEPA Reviews CEQ Issues Revised Draft Guidance on Consideration of...

213

Attachment 2: Solicitation for Offers with New and Revised Green...  

Office of Environmental Management (EM)

2: Solicitation for Offers with New and Revised Green Lease Text Attachment 2: Solicitation for Offers with New and Revised Green Lease Text Solicitation for Offers Paragraphs with...

214

Audit/Investigative Records Schedule (Revision 2) | Department...  

Office of Environmental Management (EM)

Investigative Records Schedule (Revision 2) AuditInvestigative Records Schedule (Revision 2) This schedule covers records associated with investigations other than those performed...

215

Microsoft Word - ADR Revised Policy82508Reformatted.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alternative Dispute Resolution Alternative Dispute Resolution AGENCY: Department of Energy. ACTION: Notice of Revised Policy Statement. SUMMARY: On October 24, 1995, the Department of Energy (DOE) published an interim Statement of Policy on Alternative Dispute Resolution (ADR) (60 FR 54482) to further its commitment to the use of ADR for resolving issues in controversy in a fair, timely, and cost efficient manner, and to comply with the Administrative Dispute Resolution Act (ADRA), 5 U.S.C. §571 et seq. Today, DOE publishes a revised Statement of Policy on Alternative Dispute Resolution to reaffirm its commitment to the use of ADR, including the use of Environmental Conflict Resolution (ECR) and other collaborative processes that may be utilized to prevent or avoid potential conflicts.

216

Seismic analyses of equipment in 2736-Z complex. Revision 1  

SciTech Connect

This report documents the structural qualification for the existing equipment when subjected to seismic loading in the Plutonium Storage Complex. It replaces in entirety Revision 0 and reconciles the U.S. Department of Energy (DOE) comments on Revision 0. The Complex consists of 2736-Z Building (plutonium storage vault), 2736-ZA Building (vault ventilation equipment building), and 2736-ZB Building (shipping/receiving, repackaging activities). The existing equipment structurally qualified in this report are the metal storage racks for 7 inch and lard cans in room 2 of Building 2736-Z; the cubicles, can holders and pedestals in rooms 1, 3, and 4 of Building 2736-Z; the ventilation duct including exhaust fans/motors, emergency diesel generator, and HEPA filter housing in Building 2736-ZA; the repackaging glovebox in Building 2736-ZB; and the interface duct between Buildings 2736-Z and 2736-ZA.

Ocoma, E.C.

1995-04-01T23:59:59.000Z

217

U.S. Department of Energy Releases Revised Total System Life Cycle Cost  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Releases Revised Total System Life Cycle Releases Revised Total System Life Cycle Cost Estimate and Fee Adequacy Report for Yucca Mountain Project U.S. Department of Energy Releases Revised Total System Life Cycle Cost Estimate and Fee Adequacy Report for Yucca Mountain Project August 5, 2008 - 2:40pm Addthis WASHINGTON, DC -The U.S. Department of Energy (DOE) today released a revised estimate of the total system life cycle cost for a repository at Yucca Mountain, Nevada. The 2007 total system life cycle cost estimate includes the cost to research, construct and operate Yucca Mountain during a period of 150 years, from the beginning of the program in 1983 through closure and decommissioning in 2133. The new cost estimate of $79.3 billion, when updated to 2007 dollars comes to $96.2 billion, a 38 percent

218

The Debate over Re-Licensing the Vermont Yankee Nuclear Power Plant  

Science Journals Connector (OSTI)

In 2009, the NRC's Atomic Safety and Licensing Board approved a 20-year license extension for the Vermont Yankee Nuclear Power plant. Less than seven months later, the Vermont State Senate voted 26-4 to block the required certificate for public good. How did a plant seen as likely to be re-licensed become the first in 20 years to be rejected in a public vote?

Richard Watts; Paul Hines; Jonathan Dowds

2010-01-01T23:59:59.000Z

219

The debate over re-licensing the Vermont Yankee nuclear power plant  

SciTech Connect

In 2009, the NRC's Atomic Safety and Licensing Board approved a 20-year license extension for the Vermont Yankee Nuclear Power plant. Less than seven months later, the Vermont State Senate voted 26-4 to block the required certificate for public good. How did a plant seen as likely to be re-licensed become the first in 20 years to be rejected in a public vote? (author)

Watts, Richard; Hines, Paul; Dowds, Jonathan

2010-05-15T23:59:59.000Z

220

Atomic Safety and Licensing Board Panel annual report, Fiscal year 1992  

SciTech Connect

In Fiscal Year 1992, the Atomic Safety and Licensing Board Panel (``the Panel``) handled 38 proceedings. The cases addressed issues in the construction, operation, and maintenance of commercial nuclear power reactors and other activities requiring a license from the Nuclear Regulatory Commission. This reports sets out the Panel`s caseload during the year and summarizes, highlights, and analyzes how the wide-ranging issues raised in those proceedings were addressed by the Panel`s judges and licensing boards.

Not Available

1993-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "include revised licensing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Countries Gasoline Prices Including Taxes  

Gasoline and Diesel Fuel Update (EIA)

Countries (U.S. dollars per gallon, including taxes) Countries (U.S. dollars per gallon, including taxes) Date Belgium France Germany Italy Netherlands UK US 01/13/14 7.83 7.76 7.90 8.91 8.76 8.11 3.68 01/06/14 8.00 7.78 7.94 8.92 8.74 8.09 3.69 12/30/13 NA NA NA NA NA NA 3.68 12/23/13 NA NA NA NA NA NA 3.63 12/16/13 7.86 7.79 8.05 9.00 8.78 8.08 3.61 12/9/13 7.95 7.81 8.14 8.99 8.80 8.12 3.63 12/2/13 7.91 7.68 8.07 8.85 8.68 8.08 3.64 11/25/13 7.69 7.61 8.07 8.77 8.63 7.97 3.65 11/18/13 7.99 7.54 8.00 8.70 8.57 7.92 3.57 11/11/13 7.63 7.44 7.79 8.63 8.46 7.85 3.55 11/4/13 7.70 7.51 7.98 8.70 8.59 7.86 3.61 10/28/13 8.02 7.74 8.08 8.96 8.79 8.04 3.64 10/21/13 7.91 7.71 8.11 8.94 8.80 8.05 3.70 10/14/13 7.88 7.62 8.05 8.87 8.74 7.97 3.69

222

Licensing of spent fuel dry storage and consolidated rod storage: A Review of Issues and Experiences  

SciTech Connect

The results of this study, performed by Pacific Northwest Laboratory (PNL) and sponsored by the US Department of Energy (DOE), respond to the nuclear industry's recommendation that a report be prepared that collects and describes the licensing issues (and their resolutions) that confront a new applicant requesting approval from the US Nuclear Regulatory Commission (NRC) for dry storage of spent fuel or for large-scale storage of consolidated spent fuel rods in pools. The issues are identified in comments, questions, and requests from the NRC during its review of applicants' submittals. Included in the report are discussions of (1) the 18 topical reports on cask and module designs for dry storage fuel that have been submitted to the NRC, (2) the three license applications for dry storage of spent fuel at independent spent fuel storage installations (ISFSIs) that have been submitted to the NRC, and (3) the three applications (one of which was later withdrawn) for large-scale storage of consolidated fuel rods in existing spent fuel storage pools at reactors that were submitted tot he NRC. For each of the applications submitted, examples of some of the issues (and suggestions for their resolutions) are described. The issues and their resolutions are also covered in detail in an example in each of the three subject areas: (1) the application for the CASTOR V/21 dry spent fuel storage cask, (2) the application for the ISFSI for dry storage of spent fuel at Surry, and (3) the application for full-scale wet storage of consolidated spent fuel at Millstone-2. The conclusions in the report include examples of major issues that applicants have encountered. Recommendations for future applicants to follow are listed. 401 refs., 26 tabs.

Bailey, W.J.

1990-02-01T23:59:59.000Z

223

E-Print Network 3.0 - ag license number Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Note: If both crab... , this vessel may not receive this license by transfer. Enter the name, ADF&G vessel registration number, USCG... documentation number, and the...

224

Security & Defense Licenses Available | Tech Transfer | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Available Technologies Available Technologies Analytical Instrumentation Chemicals Detectors and Sensors Energy and Utilities Healthcare and Biology Information Technology and Communications Manufacturing Materials Security and Defense Transportation Partnerships Home | Connect with ORNL | For Industry | Partnerships | Technology Licensing | Available Technologies | Security and Defense SHARE Security and Defense 200401423 Synthesis Method for Stable Colloids of "Naked" Metal Nanocrystals 200501549 Enhanced Detection of Toxic Agents 200501614 Robust Low-Frequency Spread-Spectrum Navigation System (Related ID # 200601627) 200501640 Secure Identification of Textiles and Other Consumer Products 200701980 Cyberspace Security Econometrics System 200701995 An Intrusion Detection System Using Quantum-mechanical

225

Procurement of a fully licensed radioisotope thermoelectric generator transportation system  

SciTech Connect

A fully licensed transportation system for Radioisotope Thermoelectric Generators and Light-Weight Radioisotope Heater Units is currently being designed and built. The system will comply with all applicable U.S. Department of Transportation regulations without the use of a DOE Alternative.'' The U.S. Department of Transportation has special double containment'' requirements for plutonium. The system packaging uses a doubly contained bell jar'' concept. A refrigerated trailer is used for cooling the high-heat payloads. The same packaging is used for both high- and low-heat payloads. The system is scheduled to be available for use by mid-1992.

Adkins, H.E.; Bearden, T.E. (Westinghouse Hanford Company, P.O. Box 1970, N1-42, Richland, Washington 99352 (US))

1991-01-01T23:59:59.000Z

226

Procurement of a fully licensed radioisotope thermoelectric generator transportation system  

SciTech Connect

A fully licensed transportation system for Radioisotope Thermoelectric Generators and Light-Weight Radioisotope Heater Units is currently being designed and built. The system will comply with all applicable US Department of Transportation regulations without the use of a DOE Alternative.'' The US Department of Transportation has special double containment'' requirements for plutonium. The system packaging uses a doubly contained bell jar'' concept. A refrigerated trailer is used for cooling the high-heat payloads. The same packaging is used for both high- and low-heat payloads. The system is scheduled to be available for use by mid-1992. 4 refs., 4 figs., 2 tabs.

Adkins, H.E.; Bearden, T.E.

1990-10-01T23:59:59.000Z

227

Parallel programming with PCN. Revision 2  

SciTech Connect

PCN is a system for developing and executing parallel programs. It comprises a high-level programming language, tools for developing and debugging programs in this language, and interfaces to Fortran and Cthat allow the reuse of existing code in multilingual parallel programs. Programs developed using PCN are portable across many different workstations, networks, and parallel computers. This document provides all the information required to develop parallel programs with the PCN programming system. It includes both tutorial and reference material. It also presents the basic concepts that underlie PCN, particularly where these are likely to be unfamiliar to the reader, and provides pointers to other documentation on the PCN language, programming techniques, and tools. PCN is in the public domain. The latest version of both the software and this manual can be obtained by anonymous ftp from Argonne National Laboratory in the directory pub/pcn at info.mcs. ani.gov (cf. Appendix A). This version of this document describes PCN version 2.0, a major revision of the PCN programming system. It supersedes earlier versions of this report.

Foster, I.; Tuecke, S.

1993-01-01T23:59:59.000Z

228

Licensing A Geologic Repository At Yucca Mountain, Nevada  

SciTech Connect

After completing more than twenty years of intensive scientific and engineering investigations at the Yucca Mountain site in Nevada, the U.S. Department of Energy (DOE) has determined that the site is suitable for development of a geologic repository for disposal of the Nation's spent nuclear fuel and high-level radioactive waste. Following this determination, the site was recommended to the President for repository development. The President approved the recommendation and forwarded it to the U.S. Congress for site designation. The Governor of Nevada vetoed the recommendation with a notice of disapproval to the U.S. Congress. Congress subsequently over-rode the Governor's veto with a joint resolution which the President signed into law. With site designation in effect, DOE is now focusing its work on the development of a license application for repository construction. This paper will summarize the work that had been done to support site recommendation, work that is currently being done for license application, and the necessary next steps that may be required to allow repository operations to begin in 2010.

Dyer, R. J.

2003-02-24T23:59:59.000Z

229

Requesting a Revision to PUB-3000  

NLE Websites -- All DOE Office Websites (Extended Search)

Requesting a Change to the ES&H Manual Requesting a Change to the ES&H Manual The following procedure describes the process for making changes to Berkeley Lab's ES&H Manual (PUB-3000). It identifies Responsible Authors who participate in the revision process. A request to revise the ES&H Manual may be initiated by any Berkeley Lab employee; however, all requests must be sent to the Responsible Author and approved by the ES&H Manual Manager, Mike Wisherop. If you wish to request a change to a PUB-3000 chapter, follow these steps: Contact the Responsible Author for the chapter in need of revision. Submit PUB-3000 revisions to the Responsible Author and the ES&H Manual Manager. Direct all questions or comments concerning ES&H Manual content to the ES&H Manual Manager.

230

High Level Waste System Plan Revision 9  

SciTech Connect

Revision 9 of the High Level Waste System Plan documents the current operating strategy of the HLW System at SRS to receive, store, treat, and dispose of high-level waste.

Davis, N.R.; Wells, M.N.; Choi, A.S.; Paul, P.; Wise, F.E.

1998-04-01T23:59:59.000Z

231

Revised June 2014 Training Management System (TMS)  

E-Print Network (OSTI)

Revised June 2014 Training Management System (TMS) User Manual Contents Accessing the TMS.................................................................................................................15 #12;2 Accessing the TMS Before accessing the Training Management System you must know your Harvard...........................................................................................................................................2 Training Director, Training Manager, and Course Director Access

Heller, Eric

232

Pennsylvania Coalbed Methane Proved Reserves Revision Decreases...  

U.S. Energy Information Administration (EIA) Indexed Site

Decreases (Billion Cubic Feet) Pennsylvania Coalbed Methane Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

233

Colorado Coalbed Methane Proved Reserves Revision Increases ...  

U.S. Energy Information Administration (EIA) Indexed Site

Increases (Billion Cubic Feet) Colorado Coalbed Methane Proved Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

234

Pennsylvania Coalbed Methane Proved Reserves Revision Increases...  

U.S. Energy Information Administration (EIA) Indexed Site

Increases (Billion Cubic Feet) Pennsylvania Coalbed Methane Proved Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

235

Virginia Coalbed Methane Proved Reserves Revision Decreases ...  

U.S. Energy Information Administration (EIA) Indexed Site

Decreases (Billion Cubic Feet) Virginia Coalbed Methane Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

236

Oklahoma Coalbed Methane Proved Reserves Revision Decreases ...  

U.S. Energy Information Administration (EIA) Indexed Site

Decreases (Billion Cubic Feet) Oklahoma Coalbed Methane Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

237

Arkansas Coalbed Methane Proved Reserves Revision Increases ...  

U.S. Energy Information Administration (EIA) Indexed Site

Increases (Billion Cubic Feet) Arkansas Coalbed Methane Proved Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

238

Oklahoma Coalbed Methane Proved Reserves Revision Increases ...  

U.S. Energy Information Administration (EIA) Indexed Site

Increases (Billion Cubic Feet) Oklahoma Coalbed Methane Proved Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

239

Colorado Coalbed Methane Proved Reserves Revision Decreases ...  

U.S. Energy Information Administration (EIA) Indexed Site

Decreases (Billion Cubic Feet) Colorado Coalbed Methane Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

240

Arkansas Coalbed Methane Proved Reserves Revision Decreases ...  

U.S. Energy Information Administration (EIA) Indexed Site

Decreases (Billion Cubic Feet) Arkansas Coalbed Methane Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

Note: This page contains sample records for the topic "include revised licensing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Virginia Coalbed Methane Proved Reserves Revision Increases ...  

U.S. Energy Information Administration (EIA) Indexed Site

Increases (Billion Cubic Feet) Virginia Coalbed Methane Proved Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

242

New and revised standards for coke production  

SciTech Connect

The need for new and revised standards for coke production in Ukraine and Russia is outlined. Such standards should address improvements in plant operation, working conditions, environmental protection, energy conservation, fire and explosion safety, and economic indices.

G.A. Kotsyuba; M.I. Alpatov; Y.G. Shapoval [Giprokoks, the State Institute for the Design of Coke-Industry Enterprises, Kharkov (Ukraine)

2009-07-15T23:59:59.000Z

243

EM Quality Assurance Policy, Revision 0  

Energy.gov (U.S. Department of Energy (DOE))

Previous EM policy on the use of the corporate Quality Assurance Program (EM-QA-001 Rev. 0). This document has been superseded by Revision 1 of the policy, but is still in use at some EM sites.

244

ON LICENSING AND DIFFUSION OF CLEAN TECHNOLOGIES IN Idrissa G.-O. SIBAILLY  

E-Print Network (OSTI)

ON LICENSING AND DIFFUSION OF CLEAN TECHNOLOGIES IN OLIGOPOLY Idrissa G.-O. SIBAILLY November 2013:chantal.poujouly@polytechnique.edu hal-00911453,version1-16Dec2013 #12;On licensing and diffusion of clean technologies in oligopoly Idrissa G.-O. SIBAILLY This version: November 30, 2013. Abstract Clean technologies implemented

Boyer, Edmond

245

Comparative analysis of LMFBR licensing in the United States and other countries - notably France. Final report  

SciTech Connect

This report presents an analysis of LMFBR licensing in the United States. It approaches this question broadly, examining first the system in the United States with the various sectors of the nuclear power economy, and the experience of that system in LWR licensing. It then examines the nature of LMFBR safety licensing questions - to the degree that they differ from those of LWR's - and surveys the experience of the United States and other countries in LMFBR safety licensing. Special attention is devoted to the case of France because of the technical leadership which the French program has provided, and because of the apparent efficiency with which French licensing is performed. The French licensing system and LWR licensing experience are examined, and conclusions drawn regarding the reasons for their effectiveness. Finally, a general comparison of the United States and foreign licensing systems is performed, proposals offered during the recent past for changes in the United States system are examined, and possibilities for future changes are suggested.

Golay, M.W.; Castillo, M.

1981-09-30T23:59:59.000Z

246

Albert Einstein College of Medicine Amendment to Non-human Use of Radioactive Material License  

E-Print Network (OSTI)

RSO-2 Rev.0 Albert Einstein College of Medicine Amendment to Non-human Use of Radioactive Material License INSTRUCTIONS: If you wish to make changes to your license to use radioactive material please exposure; Glove box: Mechanical pipettes: Fume hood: Absorbent liner & Tray Shielding: Lead: Lucite: GM

Emmons, Scott

247

Energy Department Issues Draft Request For Proposal for Nuclear Regulatory Commission Licensed Facilities Procurement  

Energy.gov (U.S. Department of Energy (DOE))

Cincinnati The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (DRFP) for the Nuclear Regulatory Commission (NRC) Licensed Facilities procurement. The NRC Licensed Facilities procurement is one of the four procurements that resulted from the Idaho Site Office of Environmental Management Post FY 2015 Acquisition Planning.

248

Acquisition Letter 2015-02- Revision of DOE O 350.1 and Special H Clause  

Energy.gov (U.S. Department of Energy (DOE))

Acquisition Letter 2015-02 - Revision of Department of Energy (DOE) Order 350.1 and Special H Clause The purpose of Acquisition Letter (AL) 2015-02 is to communicate the revisions to Chapter VII, Risk Management and Insurance Programs of DOE Order 350.1, Contractor Human Resource Management Programs (approved on September 30, 2014), and require Contracting Officers to modify applicable contracts no later than January 31, 2015, to include the new STRIPES Special H clause which contains requirements formerly included in the Contractor Requirements Document (CRD) of Chapter VII.

249

HLW system plan - revision 2  

SciTech Connect

The projected ability of the Tank Farm to support DWPF startup and continued operation has diminished somewhat since revision 1 of this Plan. The 13 month delay in DWPF startup, which actually helps the Tank Farm condition in the near term, was more than offset by the 9 month delay in ITP startup, the delay in the Evaporator startups and the reduction to Waste Removal funding. This Plan does, however, describe a viable operating strategy for the success of the HLW System and Mission, albeit with less contingency and operating flexibility than in the past. HLWM has focused resources from within the division on five near term programs: The three evaporator restarts, DWPF melter heatup and completion of the ITP outage. The 1H Evaporator was restarted 12/28/93 after a 9 month shutdown for an extensive Conduct of Operations upgrade. The 2F and 2H Evaporators are scheduled to restart 3/94 and 4/94, respectively. The RHLWE startup remains 11/17/97.

Not Available

1994-01-14T23:59:59.000Z

250

Licensing Agreement Moves Two NETL-Patented Carbon Capture Sorbents Closer  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Licensing Agreement Moves Two NETL-Patented Carbon Capture Sorbents Licensing Agreement Moves Two NETL-Patented Carbon Capture Sorbents Closer to Commercialization Licensing Agreement Moves Two NETL-Patented Carbon Capture Sorbents Closer to Commercialization March 23, 2011 - 1:00pm Addthis Washington, DC - Two new patented sorbents used for carbon dioxide (CO2) capture from coal-based power plants have moved closer to commercialization as a result of a licensing agreement between the Office of Fossil Energy's (FE) National Energy Technology Laboratory (NETL) and ADA Environmental Solutions (ADA-ES). The nonexclusive agreement facilitates negotiations on intellectual property rights, protects proprietary information, and grants non-exclusive licensing of the new technology. Under federal regulations, NETL is authorized to obtain, maintain, and own patent protection for its

251

Licensing Agreement Moves Two NETL-Patented Carbon Capture Sorbents Closer  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Licensing Agreement Moves Two NETL-Patented Carbon Capture Sorbents Licensing Agreement Moves Two NETL-Patented Carbon Capture Sorbents Closer to Commercialization Licensing Agreement Moves Two NETL-Patented Carbon Capture Sorbents Closer to Commercialization March 23, 2011 - 1:00pm Addthis Washington, DC - Two new patented sorbents used for carbon dioxide (CO2) capture from coal-based power plants have moved closer to commercialization as a result of a licensing agreement between the Office of Fossil Energy's (FE) National Energy Technology Laboratory (NETL) and ADA Environmental Solutions (ADA-ES). The nonexclusive agreement facilitates negotiations on intellectual property rights, protects proprietary information, and grants non-exclusive licensing of the new technology. Under federal regulations, NETL is authorized to obtain, maintain, and own patent protection for its

252

UNITED STATES OF AMERICA ATOMIC ENERGY COMMISSION APPLICATION FORAEC LICENSE TO  

Office of Legacy Management (LM)

OF AMERICA OF AMERICA ATOMIC ENERGY COMMISSION APPLICATION FORAEC LICENSE TO TRANSFER,DELIVER,EXPORT,OR RECEIVE URANIUM ORTHORIUM SOURCE MATERIAL Pursuant to Code of Federal Regulations. Title II- Atomic Energy. Part IO-Control of Source Material Form approved Budget Bureau No. 3%RO02.2. 2. PREVIOUS AEC LICENSE NUMBER, IF ANY. R-103 _..._............_.~_~~......~~~.....~.. INSTRUCTIONS File two (2) copies of this application with the U. S. Atomic Energy Commission, P. 0. Box 30, Ansonia Station, New York 23, N. Y. This application may be used for an original license or for the renewal of a license. In the case of a rrnewal, this application should be received by the Commission on or before 30 days before the expiration of the previous license. Complete blocks 1, 2, 3, 9. and if

253

Licensing the ACR in the USA - A Status Report  

SciTech Connect

The ACR-700 (ACR) is an evolutionary reactor design, which incorporates the inherent safety features of the Candu products, as well as the successful operating experience of the current Candu 6 reactors. The improvements to the ACR from Candu 6 result in significant reductions in capital and operating costs as well as enhanced safety. AECL Technologies (AECLT, a wholly owned US subsidiary of Atomic Energy of Canada Limited) is the proponent for the ongoing pre-application review of the ACR with the US Nuclear Regulatory Commission (NRC) in the United States. This pre-application review will be completed shortly and will support an application to the USNRC for Standard Design Certification (SDC). AECL Technologies' overall objective for the pre-application review of the ACR is to obtain an understanding of the scope, cost, and the schedule to obtain a Standard Design Certification for the ACR. The pre-application review will address licensing issues associated with the Candu reactor technologies in ACR that depart from the light water reactor, pressure-vessel based regulatory framework in the USA. Therefore, during the course of the ACR pre-application review, major USNRC issues with the ACR design will be identified early and the scope of the work required to address these concerns, along with associated completion schedules, will be formulated and ultimately agreed upon with the USNRC. AECLT has been informed by the NRC staff that the results of their pre-application review will be documented in a Safety Assessment Report (SAR), which will state whether there are any major impediments to licensing the ACR in the United States. In particular, the SAR should provide confirmation of the licensing criteria applicable to the ACR, provide an assessment of the completeness of AECL's Research and Development (R and D) programs that exist or are planned in support of the ACR, provide an assessment of the suitability for purpose of the computer codes used in the safety analysis of the ACR, and provide estimates of the cost and schedule for the remaining scope of the USNRC's efforts on the identified focus topics in preparation for a Design Certification review. This paper will discuss the status of the pre-application review for ACR. (authors)

Snell, Victor; Langman, Vince; Ion, Robert; Reid, Calvin [2251 Speakman Drive, Mississauga, Ontario, L5K 1B2 (Canada)

2004-07-01T23:59:59.000Z

254

Water Security Toolkit User Manual Version 1.2.  

SciTech Connect

The Water Security Toolkit (WST) is a suite of open source software tools that can be used by water utilities to create response strategies to reduce the impact of contamination in a water distribution network . WST includes hydraulic and water quality modeling software , optimizati on methodologies , and visualization tools to identify: (1) sensor locations to detect contamination, (2) locations in the network in which the contamination was introduced, (3) hydrants to remove contaminated water from the distribution system, (4) locations in the network to inject decontamination agents to inactivate, remove, or destroy contaminants, (5) locations in the network to take grab sample s to help identify the source of contamination and (6) valves to close in order to isolate contaminate d areas of the network. This user manual describes the different components of WST , along w ith examples and case studies. License Notice The Water Security Toolkit (WST) v.1.2 Copyright c 2012 Sandia Corporation. Under the terms of Contract DE-AC04-94AL85000, there is a non-exclusive license for use of this work by or on behalf of the U.S. government. This software is distributed under the Revised BSD License (see below). In addition, WST leverages a variety of third-party software packages, which have separate licensing policies: Acro Revised BSD License argparse Python Software Foundation License Boost Boost Software License Coopr Revised BSD License Coverage BSD License Distribute Python Software Foundation License / Zope Public License EPANET Public Domain EPANET-ERD Revised BSD License EPANET-MSX GNU Lesser General Public License (LGPL) v.3 gcovr Revised BSD License GRASP AT&T Commercial License for noncommercial use; includes randomsample and sideconstraints executable files LZMA SDK Public Domain nose GNU Lesser General Public License (LGPL) v.2.1 ordereddict MIT License pip MIT License PLY BSD License PyEPANET Revised BSD License Pyro MIT License PyUtilib Revised BSD License PyYAML MIT License runpy2 Python Software Foundation License setuptools Python Software Foundation License / Zope Public License six MIT License TinyXML zlib License unittest2 BSD License Utilib Revised BSD License virtualenv MIT License Vol Common Public License vpykit Revised BSD License Additionally, some precompiled WST binary distributions might bundle other third-party executables files: Coliny Revised BSD License (part of Acro project) Dakota GNU Lesser General Public License (LGPL) v.2.1 PICO Revised BSD License (part of Acro project) i Revised BSD License Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met: * Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer. * Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution. * Neither the name of Sandia National Laboratories nor Sandia Corporation nor the names of its con- tributors may be used to endorse or promote products derived from this software without specific prior written permission. THIS SOFTWARE IS PROVIDED BY THE COPYRIGHT HOLDERS AND CONTRIBUTORS %22AS IS%22 AND ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IM- PLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL SANDIA CORPORATION BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUD- ING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE. ii Acknowledgements This work was supported by the U.S. Environmental Protection Agen

Klise, Katherine A.; Siirola, John Daniel; Hart, David; Hart, William E.; Phillips, Cynthia A.; Haxton, Terranna; Murray, Regan; Janke, Robert; Taxon, Thomas; Laird, Carl; Seth, Arpan; Hackebeil, Gabriel; McGee, Shawn; Mann, Angelica

2014-08-01T23:59:59.000Z

255

Carbonaceous Chemistry for Computational Modeling Licensing and Partnership Opportunity  

NLE Websites -- All DOE Office Websites (Extended Search)

Chemistry for Computational Modeling Chemistry for Computational Modeling Opportunity The Department of Energy's National Energy Technology Laboratory (NETL) has developed a software platform entitled Carbonaceous Chemistry for Computational Modeling (C3M) that is used to access a variety of kinetic processes and reaction mechanisms typically found in coal gasification, gas clean-up, and carbon capture processes. This unique software provides the user the ability to conduct virtual kinetic experiments using leading kinetic packages and available experimental data to evaluate kinetic predictions as a function of fuel and sorbent type and/or operating conditions. A Patent Cooperation Treaty application was filed in June 2008. NETL is seeking non-exclusive licensing partners interested in implementing

256

Total System Performance Assessment - License Application Methods and Approach  

SciTech Connect

''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issues (KTIs) identified in agreements with the U.S. Nuclear Regulatory Commission, the ''Yucca Mountain Review Plan'' (YMRP), ''Final Report'' (NRC 2003 [163274]), and the NRC final rule 10 CFR Part 63 (NRC 2002 [156605]). This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are used in this document.

J. McNeish

2003-12-08T23:59:59.000Z

257

Transuranic waste baseline inventory report. Revision No. 3  

SciTech Connect

The Transuranic Waste Baseline Inventory Report (TWBIR) establishes a methodology for grouping wastes of similar physical and chemical properties from across the U.S. Department of Energy (DOE) transuranic (TRU) waste system into a series of {open_quotes}waste profiles{close_quotes} that can be used as the basis for waste form discussions with regulatory agencies. The purpose of Revisions 0 and 1 of this report was to provide data to be included in the Sandia National Laboratories/New Mexico (SNL/NM) performance assessment (PA) processes for the Waste Isolation Pilot Plant (WIPP). Revision 2 of the document expanded the original purpose and was also intended to support the WIPP Land Withdrawal Act (LWA) requirement for providing the total DOE TRU waste inventory. The document included a chapter and an appendix that discussed the total DOE TRU waste inventory, including nondefense, commercial, polychlorinated biphenyls (PCB)-contaminated, and buried (predominately pre-1970) TRU wastes that are not planned to be disposed of at WIPP.

NONE

1996-06-01T23:59:59.000Z

258

Limited exemption to hydroelectric licensing provisions for transmission facilities associated with the El Vado Hydroelectric Project. Introduced in the Senate, One Hundred Fourth Congress, First Session, April 27, 1995  

SciTech Connect

The report addresses bill S. 522 which is to provide for a limited exemption to the hydroelectric licensing provisions of part I of the Federal Power Act for certain transmission facilities associated with the El Vado Hydroelectric Project in New Mexico. The bill proposes to permit a limited exemption for a 12 mile transmission line to Rio Arriba County, New Mexico. The project was licensed by the Federal Energy Regulatory Commission. The background and need for the exemption is presented. Statements of government officials are included.

NONE

1995-12-31T23:59:59.000Z

259

Atomic Safety and Licensing Board Panel Biennial Report, Fiscal Years 1993--1994. Volume 6  

SciTech Connect

In Fiscal Year 1993, the Atomic Safety and Licensing Board Panel (``the Panel``) handled 30 proceedings. In Fiscal Year 1994, the Panel handled 36 proceedings. The cases addressed issues in the construction, operation, and maintenance of commercial nuclear power reactors and other activities requiring a license form the Nuclear Regulatory Commission. This report sets out the Panel`s caseload during the year and summarizes, highlight, and analyzes how the wide- ranging issues raised in those proceedings were addressed by the Panel`s judges and licensing boards.

NONE

1995-08-01T23:59:59.000Z

260

Environmental Standard Review Plan for the review of license renewal applications for nuclear power plants  

SciTech Connect

The Environmental Standard Review Plan for the Review of License Applications for Nuclear Power Plants (ESRP-LR) is to be used by the NRC staff when performing environmental reviews of applications for the renewal of power reactor licenses. The use of the ESRP-LR provides a framework for the staff to determine whether or not environmental issues important to license renewal have been identified and the impacts evaluated and provides acceptance standards to help the reviewers comply with the National Environmental Policy Act.

O'Brien, J.; Kim, T.J.; Reynolds, S.

1991-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "include revised licensing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Document last revised July 2010 1 Connecticut Environmental Conditions Online www.cteco.uconn.edu  

E-Print Network (OSTI)

Document last revised July 2010 1 Connecticut Environmental Conditions Online ­ www (POSM) project. It does not include parcel data from towns located along the Connecticut coastline since July 2010 2 Connecticut Environmental Conditions Online ­ www.cteco.uconn.edu (the assessor's database

Holsinger, Kent

262

Hanford Site National Environmental Policy Act (NEPA) characterization. Revision 7  

SciTech Connect

This seventh revision of the Hanford Site National Environmental Policy (NEPA) Characterization presents current environmental data regarding the Hanford Site and its immediate environs. This information is intended for use in preparing Site-related NEPA documentation. Chapter 4.0 summarizes up-to-date information on climate and meteorology, geology, hydrology, environmental monitoring, ecology, history and archaeology, socioeconomics, land use, and noise levels prepared by Pacific Northwest Laboratory (PNL) staff. More detailed data are available from reference sources cited or from the authors. Chapter 5.0 was not updated from the sixth revision (1994). It describes models, including their principal underlying assumptions, that are to be used in simulating realized or potential impacts from nuclear materials at the Hanford Site. Included are models of radionuclide transport in groundwater and atmospheric pathways, and of radiation dose to populations via all known pathways from known initial conditions. The updated Chapter 6.0 provides the preparer with the federal and state regulations, DOE Orders and permits, and environmental standards directly applicable to the NEPA documents on the Hanford Site, following the structure of Chapter 4.0. No conclusions or recommendations are given in this report. Rather, it is a compilation of information on the Hanford Site environment that can be used directly by Site contractors. This information can also be used by any interested individual seeking baseline data on the Hanford Site and its past activities by which to evaluate projected activities and their impacts.

Cushing, C.E. [ed.] ed.; Baker, D.A.; Chamness, M.A. [and others] and others

1995-09-01T23:59:59.000Z

263

Hanford Site National Environmental Policy Act (NEPA) characterization. Revision 6  

SciTech Connect

This sixth revision of the Hanford Site National Environmental Policy (NEPA) Characterization presents current environmental data regarding the Hanford Site and its immediate environs. This information is intended for use in preparing Site-related NEPA documentation. Chapter 4.0 summarizes up-to-date information on climate and meteorology, geology and hydrology, ecology, history and archaeology, socioeconomics, land use, and noise levels prepared by Pacific Northwest Laboratory (PNL) staff. More detailed data are available from reference sources cited or from the authors; Chapter 5.0 has been significantly updated from the fifth revision. It describes models, including their principal underlying assumptions, that are to be used in simulating realized or potential impacts from nuclear materials at the Hanford Site. Included are models of radionuclide transport in groundwater and atmospheric pathways, and of radiation dose to populations via all known pathways from known initial conditions; The updated Chapter 6.0 provides the preparer with the federal and state regulations, DOE orders and permits, and environmental standards directly applicable to the NEPA documents on the Hanford Site, following the structure of Chapter 4.0. No conclusions or recommendations are given in this report. Rather, it is a compilation of information on the Hanford Site environment that can be utilized directly by Site contractors. This information can also be used by any interested individual seeking baseline data on the Hanford Site and its past activities by which to evaluate projected activities and their impacts.

Cushing, C.E. [ed.; Baker, D.A.; Chamness, M.A. [and others

1994-08-01T23:59:59.000Z

264

Microsoft Word - LBNL-57260-Revision.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

7260-Revision 7260-Revision ERNEST ORLANDO LAWRENCE BERKELEY NATIONAL LABORATORY Energy Efficiency Improvement and Cost Saving Opportunities for the Pharmaceutical Industry An ENERGY STAR ® Guide for Energy and Plant Managers Christina Galitsky, Sheng-chieh Chang, Ernst Worrell, and Eric Masanet Environmental Energy Technologies Division Sponsored by the U.S. Environmental Protection Agency March 2008 Disclaimer This document was prepared as an account of work sponsored by the United States Government. While this document is believed to contain correct information, neither the United States Government nor any agency thereof, nor The Regents of the University of California, nor any of their employees, makes any warranty, express or implied, or assumes

265

A New Approach To Kimberlite Facies Terminology Using A Revised General  

Open Energy Info (EERE)

New Approach To Kimberlite Facies Terminology Using A Revised General New Approach To Kimberlite Facies Terminology Using A Revised General Approach To The Nomenclature Of All Volcanic Rocks And Deposits- Descriptive To Genetic Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Journal Article: A New Approach To Kimberlite Facies Terminology Using A Revised General Approach To The Nomenclature Of All Volcanic Rocks And Deposits- Descriptive To Genetic Details Activities (0) Areas (0) Regions (0) Abstract: Although kimberlite pipes/bodies are usually the remains of volcanic vents, in-vent deposits, and subvolcanic intrusions, the terminology used for kimberlite rocks has largely developed independently of that used in mainstream volcanology. Existing kimberlite terminology is not descriptive and includes terms that are rarely used, used differently,

266

MAGNET CELL SAFETY PROCEDURE SP-16 Revision 02  

E-Print Network (OSTI)

MAGNET CELL SAFETY PROCEDURE SP-16 Page i Revision 02 July 19, 2006 NATIONAL HIGH MAGNETIC: MAGNET CELL SAFETY PROCEDURE ______________________________________________________ HEAD of MAGNET ______________________________________________________ HEAD of FACILITIES John Kynoch #12;MAGNET CELL SAFETY PROCEDURE SP-16 Pageii Revision 02 July 19

Weston, Ken

267

Policy Flash 2015 Revision to the Federal Assistance Reporting...  

NLE Websites -- All DOE Office Websites (Extended Search)

Revision to the Federal Assistance Reporting Checklist, DOE F 4600.2 (102014). Policy Flash 2015 Revision to the Federal Assistance Reporting Checklist, DOE F 4600.2 (102014)....

268

Microsoft Word - NDA Box PDP Plan-Revision 4-final  

NLE Websites -- All DOE Office Websites (Extended Search)

Characterization Program Revision 4 May 2013 This document supersedes Revision 3 of DOECBFO-01-1006 U.S. Department of Energy Carlsbad Field Office Office of the National TRU...

269

Psychometric properties of the revised marital satisfaction inventory  

E-Print Network (OSTI)

This study examines the psychometric properties of the Revised marital Satisfaction Inventory (MSI-R) using archival data from previous validation studies of the original instrument. Normalized T-scores were identified for each of the 11 revised...

Aikman, Grace Glass

2012-06-07T23:59:59.000Z

270

Ohio Coalbed Methane Proved Reserves Revision Decreases (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Revision Decreases (Billion Cubic Feet) Ohio Coalbed Methane Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

271

EIS 0026: Revision of the Record of Decision | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS 0026: Revision of the Record of Decision EIS 0026: Revision of the Record of Decision Waste Isolation Pilot Plant Disposal Phase DOE has decided to dispose of up to 2,500 cubic...

272

Better Lucky Than Rich? Welfare Analysis of Automobile License Allocations in Beijing and Shanghai  

E-Print Network (OSTI)

Better Lucky Than Rich? Welfare Analysis of Automobile License Allocations in Beijing and Shanghai externalities from automobile use than a uniform price auction, the advantage is offset by the significant automobile sales in China grew from 2.4 millio

Schweik, Charles M.

273

Atomic Energy and Radioactive Substances: Licensing and Regulation of Sites: The Nuclear Installations Regulations, 1962  

E-Print Network (OSTI)

These regulations, made by the Minister of Power and the Secretary of State for Scotland acting jointly, prescribe for the purpose of subsection (1)(b) of section one of the Nuclear Installations (Licensing and Insurance) Act, 1959, certain classes...

Wood, Richard; Maclay, John. S.

1962-01-01T23:59:59.000Z

274

Y-12 licenses Omni Jaw 5(tm) | National Nuclear Security Administratio...  

National Nuclear Security Administration (NNSA)

Y-12 National Security Complex signed a licensing agreement with start-up company Green Arc Labs (GAL) of Chattanooga for Omni Jaw 5. The hand-held tool, invented a decade...

275

Pricing and licensing of software products and services : a study on industry trends  

E-Print Network (OSTI)

The software product business reached the $150 billion mark at the end of 2005. The pricing and licensing of new products, maintenance services, services and service maintenance have become an important strategy to deliver ...

Nayak, Shivashis

2006-01-01T23:59:59.000Z

276

Brookhaven National Laboratory Number: Revision  

E-Print Network (OSTI)

includes both laser (light) and non-laser hazards. A Nominal Hazard Zone (NHZ) analysis must be completed listed below. All American National Standard Institute (ANSI) Hazard Class 3b and 4 laser systems must description: Pulsed laser deposition system for thin films growth. Location: NSLS-X21 LINE MANAGEMENT

Ohta, Shigemi

277

Program Plan for Revision of the Z-Area Saltstone Disposal Facility Performance Assessment  

SciTech Connect

Savannah River National Laboratory (SRNL) and the Saltstone Project, are embarking on the next revision to the Saltstone Disposal Facility (SDF) performance assessment (PA). This program plan has been prepared to outline the general approach, scope, schedule and resources for the PA revision. The plan briefly describes the task elements of the PA process. It discusses critical PA considerations in the development of conceptual models and interpretation of results. Applicable quality assurance (QA) requirements are identified and the methods for implementing QA for both software and documentation are described. The plan identifies project resources supporting the core team and providing project oversight. Program issues and risks are identified as well as mitigation of those risks. Finally, a preliminary program schedule has been developed and key deliverables identified. A number of significant changes have been implemented since the last PA revision resulting in a new design for future SDF disposal units. This revision will encompass the existing and planned disposal units, PA critical radionuclides and exposure pathways important to SDF performance. An integrated analysis of the overall facility layout, including all disposal units, will be performed to assess the impact of plume overlap on PA results. Finally, a rigorous treatment of uncertainty will be undertaken using probabilistic simulations. This analysis will be reviewed and approved by DOE-SR, DOE-HQ and potentially the Nuclear Regulatory Commission (NRC). This revision will be completed and ready for the start of the DOE review at the end of December 2006. This work supports a Saltstone Vault 2 fee-bearing milestone. This milestone includes completion of the Vault 2 module of the PA revision by the end of FY06.

Cook, James R.

2005-12-07T23:59:59.000Z

278

Emergency Doses (ED) - Revision 3: A calculator code for environmental dose computations  

SciTech Connect

The calculator program ED (Emergency Doses) was developed from several HP-41CV calculator programs documented in the report Seven Health Physics Calculator Programs for the HP-41CV, RHO-HS-ST-5P (Rittman 1984). The program was developed to enable estimates of offsite impacts more rapidly and reliably than was possible with the software available for emergency response at that time. The ED - Revision 3, documented in this report, revises the inhalation dose model to match that of ICRP 30, and adds the simple estimates for air concentration downwind from a chemical release. In addition, the method for calculating the Pasquill dispersion parameters was revised to match the GENII code within the limitations of a hand-held calculator (e.g., plume rise and building wake effects are not included). The summary report generator for printed output, which had been present in the code from the original version, was eliminated in Revision 3 to make room for the dispersion model, the chemical release portion, and the methods of looping back to an input menu until there is no further no change. This program runs on the Hewlett-Packard programmable calculators known as the HP-41CV and the HP-41CX. The documentation for ED - Revision 3 includes a guide for users, sample problems, detailed verification tests and results, model descriptions, code description (with program listing), and independent peer review. This software is intended to be used by individuals with some training in the use of air transport models. There are some user inputs that require intelligent application of the model to the actual conditions of the accident. The results calculated using ED - Revision 3 are only correct to the extent allowed by the mathematical models. 9 refs., 36 tabs.

Rittmann, P.D.

1990-12-01T23:59:59.000Z

279

A hierarchical structure of neural network implemented for the recognition of automobile license plate number  

E-Print Network (OSTI)

A HIERARCHICAL STRUCTURE OF NEURAL NETWORK IMPLEMENTED FOR THE RECOGNITION OF AUTOMOBILE LICENSE PLATE NURSER A Thesis by JOONGHO CHANG Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfdlment... of the requirements for the degree of MASTER OF SCIENCE August 1994 Major Subject: Electrical Engineering A HIERARCHICAL STRUCTURE OF NEURAL NETWORK IMPLEMENTED FOR THE RECOGNITION OF AUTOMOBILE LICENSE PLATE NUMBER A Thesis by JOONGHO CHANG Submitted...

Chang, Joongho

1994-01-01T23:59:59.000Z

280

BSCMeasuresInformationRevisionSept2005.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Procurement System Balanced Scorecard Performance Measures Information Document Office of Procurement and Assistance Management Revised: September 2005 2 Table of Contents Purpose ...................................................................................................... 4 CUSTOMER PERSPECTIVE Customer Satisfaction: Timeliness ........................................................................................... 5 Quality ................................................................................................ 7 Effective Service/Partnership ........................................................................... 9 INTERNAL BUSINESS PERSPECTIVE Acquisition Excellence .................................................................................. 11

Note: This page contains sample records for the topic "include revised licensing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

BIOLOGICAL SAFETY MANUAL Revised April 2004  

E-Print Network (OSTI)

BIOLOGICAL SAFETY MANUAL Revised April 2004 #12;TABLE OF CONTENTS Emergency Numbers iv Awareness: Biological Safety Cabinets 31 Appendix D: Working Safely in a Biological Safety Cabinet 33 Ultraviolet and Tissue Culture Systems 50 Classification of Cell and/or Tissue Cultures According to Containment Level

Holland, Jeffrey

282

Revised 2/2012 PSYCHOLOGY MAJOR  

E-Print Network (OSTI)

Revised 2/2012 PSYCHOLOGY MAJOR REQUIREMENTS (Effective August 2012) Name: ID#: First Semester FOUNDATION COURSES (20 units): PSYC-101 General Psychology PSYC-260 Psychological Statistics PSYC-270 Biological Psychology RHET 203 Writing in Psychology (or RHET 301) PSYC-265 Research Design ONE DIVERSITY

Galles, David

283

Anomalies of Nuclear Criticality, Revision 6  

SciTech Connect

This report is revision 6 of the Anomalies of Nuclear Criticality. This report is required reading for the training of criticality professionals in many organizations both nationally and internationally. This report describes many different classes of nuclear criticality anomalies that are different than expected.

Clayton, E. D.; Prichard, Andrew W.; Durst, Bonita E.; Erickson, David; Puigh, Raymond J.

2010-02-19T23:59:59.000Z

284

Revised: May 2011 Fraud Prevention Policy  

E-Print Network (OSTI)

Revised: May 2011 Fraud Prevention Policy #12;Fraud Prevention Policy March 2011 1 Contents Page 1 of Audit 6 10. Notification of Suspected Fraud 7 11. Fraud Response Plan 7 12. Dissemination of the Policy 8 Appendix A Fraud Response Plan 9 Appendix B Further Reference 15 #12;Fraud Prevention Policy March

Mottram, Nigel

285

ACTION PLANS STRATEGIC PRIORITY: Role Clarification (revised)  

E-Print Network (OSTI)

with the President, Director & Associate Director. Review current communications plan for Executive and BoardACTION PLANS STRATEGIC PRIORITY: Role Clarification (revised) GOAL Foster pride and participation informed MAA Board Investigate an increase in number of Executive Committee meetings with standard agenda

Thompson, Michael

286

Revised 2006 UNDERGRADUATE MINOR IN MECHANICAL ENGINEERING  

E-Print Network (OSTI)

Revised 2006 UNDERGRADUATE MINOR IN MECHANICAL ENGINEERING Instructions for declaring the ME Services Office (Building 530, room 125) · Submit the form to Student Services and the login to Axess students to the breadth of Mechanical Engineering topics and analytic design activities. Prerequisites

Prinz, Friedrich B.

287

Revised Spring 2008 NIH Public Access Policy  

E-Print Network (OSTI)

Revised Spring 2008 NIH Public Access Policy Notice Number: NOT-OD-08-033 - (See Notice NOT-OD-08-161 (Consolidated Appropriations Act, 2008), the NIH voluntary Public Access Policy (NOT-OD-05-022) is now mandatory shall implement the public access policy in a manner consistent with copyright law. Specifics 1. The NIH

288

FTCP Corrective Action Plan- Revision 1  

Energy.gov (U.S. Department of Energy (DOE))

January 2007 FTCP Corrective Action Plan, Revision 1, which is Deliverable B for Commitment 13 in the Department of Energy (DOE) Implementation Plan to Improve Oversight of Nuclear Operations, issued in response to Defense Nuclear Facilities Safety Board Recommendation 2004- 1, Oversight of Complex, High-Hazard Nuclear Operations

289

FTCP Corrective Action Plan- Revision 2  

Energy.gov (U.S. Department of Energy (DOE))

March 2009 FTCP Corrective Action Plan, Revision 2, which is Deliverable B for Commitment 13 in the Department of Energy (DOE) Implementation Plan to Improve Oversight of Nuclear Operations, issued in response to Defense Nuclear Facilities Safety Board Recommendation 2004-1, Oversight of Complex, High-Hazard Nuclear Operations

290

Revised Nov. 2013 Contracting and Procurement Services  

E-Print Network (OSTI)

Revised Nov. 2013 Contracting and Procurement Services Contract and Purchase Order Cover Sheet Procedures The Contract and Purchase Order Cover Sheet is an internal document utilized by Contracting the business purpose of the proposed purchase or contract; 2) Identify courses offered for credit at off campus

Caughman, John

291

Last revised: December 2011 CH 153K  

E-Print Network (OSTI)

-volume reference tool such as the CRC Handbook of Chemistry and Physics. It mightLast revised: December 2011 CH 153K Finding Physical and Chemical Property be electronic versions of printed books (e.g. the CRC Handbook), or they may

292

OPTIMIZATION TOPICS LIST Revised April 2012  

E-Print Network (OSTI)

1 OPTIMIZATION TOPICS LIST Revised April 2012 For Fall 2012 and Spring 2013 we will adopt. Bertsimas and J. Tsitsiklis, Introduction to Linear Optimization, Athena Scientific, 1997 2. M. C. Ferris, O and mixed integer models · Existence of optimal solutions, optimality conditions · Branch and bound methods

Radeloff, Volker C.

293

Revised October 2013 BACHELOR of ARTS DEGREE  

E-Print Network (OSTI)

of Science: (Please see FAU catalog for possible prerequisite courses) MAC MAC MAD MAC MAS STA MAA MAS MTG, or electronically for people with disabilities. Please allow at least 10 days to process this request. #12;Revised MAT CIS MAS MAD MTG MAT

Fernandez, Eduardo

294

Last revised July 2008 Harvard University  

E-Print Network (OSTI)

Last revised July 2008 Harvard University Purchasing Card Individual Cardholder Application, Part 1 Harvard Office Mailing Address City, State, Zip Code Harvard Phone Number ( ) - 33-Digit Default General") are pleased to offer you the Purchasing Card. The Purchasing Card represents Harvard's trust in you

Chen, Yiling

295

FACULTY HANDBOOK Last Revised: July 31, 2012  

E-Print Network (OSTI)

for which the handbook does not provide answers. As policies, procedures, and operating guidelinesFACULTY HANDBOOK Last Revised: July 31, 2012 Foreword The purpose of publishing the Faculty Handbook is to provide ready access to information concerning the orderly operation of the University

Thaxton, Christopher S.

296

FACULTY HANDBOOK Last Revised: August 13, 2014  

E-Print Network (OSTI)

for which the handbook does not provide answers. As policies, procedures, and operating guidelinesFACULTY HANDBOOK Last Revised: August 13, 2014 Foreword The purpose of publishing the Faculty Handbook is to provide ready access to information concerning the orderly operation of the University

Thaxton, Christopher S.

297

FACULTY HANDBOOK Last Revised: August 15, 2013  

E-Print Network (OSTI)

for which the handbook does not provide answers. As policies, procedures, and operating guidelinesFACULTY HANDBOOK Last Revised: August 15, 2013 Foreword The purpose of publishing the Faculty Handbook is to provide ready access to information concerning the orderly operation of the University

Thaxton, Christopher S.

298

Curriculum Vitae | ANTHONY FAIOLA Revised 3/3/20141 CURRICULUM VITAE  

E-Print Network (OSTI)

Vitae | ANTHONY FAIOLA Revised 3/3/20141 CURRICULUM VITAE ANTHONY FAIOLA;___________________________________________________________________________________________________________________________________________________________________________________ Curriculum Vitae | ANTHONY FAIOLA Revised 3___________________________________________________________________________________________________________________________________________________________________________________ Curriculum

Zhou, Yaoqi

299

Corrective Action Decision Document for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada: Revision 0, Including Errata Sheet  

SciTech Connect

This Corrective Action Decision Document identifies the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's corrective action alternative recommendation for each of the corrective action sites (CASs) within Corrective Action Unit (CAU) 204: Storage Bunkers, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. An evaluation of analytical data from the corrective action investigation, review of current and future operations at each CAS, and a detailed comparative analysis of potential corrective action alternatives were used to determine the appropriate corrective action for each CAS. There are six CASs in CAU 204, which are all located between Areas 1, 2, 3, and 5 on the NTS. The No Further Action alternative was recommended for CASs 01-34-01, 02-34-01, 03-34-01, and 05-99-02; and a Closure in Place with Administrative Controls recommendation was the preferred corrective action for CASs 05-18-02 and 05-33-01. These alternatives were judged to meet all requirements for the technical components evaluated as well as applicable state and federal regulations for closure of the sites and will eliminate potential future exposure pathways to the contaminated media at CAU 204.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

2004-04-01T23:59:59.000Z

300

SCALE: A modular code system for performing standardized computer analyses for licensing evaluation: Functional modules F1-F8  

SciTech Connect

This Manual represents Revision 5 of the user documentation for the modular code system referred to as SCALE. The history of the SCALE code system dates back to 1969 when the current Computational Physics and Engineering Division at Oak Ridge National Laboratory (ORNL) began providing the transportation package certification staff at the U.S. Atomic Energy Commission with computational support in the use of the new KENO code for performing criticality safety assessments with the statistical Monte Carlo method. From 1969 to 1976 the certification staff relied on the ORNL staff to assist them in the correct use of codes and data for criticality, shielding, and heat transfer analyses of transportation packages. However, the certification staff learned that, with only occasional use of the codes, it was difficult to become proficient in performing the calculations often needed for an independent safety review. Thus, shortly after the move of the certification staff to the U.S. Nuclear Regulatory Commission (NRC), the NRC staff proposed the development of an easy-to-use analysis system that provided the technical capabilities of the individual modules with which they were familiar. With this proposal, the concept of the Standardized Computer Analyses for Licensing Evaluation (SCALE) code system was born. This volume consists of the section of the manual dealing with eight of the functional modules in the code. Those are: BONAMI - resonance self-shielding by the Bondarenko method; NITAWL-II - SCALE system module for performing resonance shielding and working library production; XSDRNPM - a one-dimensional discrete-ordinates code for transport analysis; XSDOSE - a module for calculating fluxes and dose rates at points outside a shield; KENO IV/S - an improved monte carlo criticality program; COUPLE; ORIGEN-S - SCALE system module to calculate fuel depletion, actinide transmutation, fission product buildup and decay, and associated radiation source terms; ICE.

NONE

1997-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "include revised licensing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Document: P1332 Category: Physical Sciences, Chemical/Materials License Status: Available for licensing Texas Industry Cluster: Petroleum Refining & Chemical Products  

E-Print Network (OSTI)

Protection Agency states: "Accelerating the development of fuel cells and hydrogen is one of the most. This solution offers not only reduced cost of the fuel cell catalyst but also improved performance. Benefits for licensing Texas Industry Cluster: Petroleum Refining & Chemical Products Lower-cost fuel cells Problem

Lightsey, Glenn

302

Guidance document for revision of DOE Order 5820.2A, Radioactive Waste Technical Support Program. Revision 1  

SciTech Connect

This document provides guidance for the revision of DOE Order 5820.2A, ``Radioactive Waste Management.`` Technical Working Groups have been established and are responsible for writing the revised order. The Technical Working Groups will use this document as a reference for polices and procedures that have been established for the revision process. The overall intent of this guidance is to outline how the order will be revised and how the revision process will be managed. In addition, this document outlines technical issues considered for inclusion by a Department of Energy Steering Committee.

Kudera, D.E.; McMurtrey, C.D.; Meagher, B.G.

1993-04-01T23:59:59.000Z

303

Radioisotope thermoelectric generator load and unload sequence from the licensed hardware package system and the trailer system  

SciTech Connect

The Radioisotope Thermoelectric Generator Transportation System, designated as System 100, comprises four major systems. The four major systems are designated as the Packaging System (System 120), Trailer System (System 140), Operations and Ancillary Equipment System (System 160), including the Radioisotope Thermoelectric Generator Transportation System packaging is licensed (regularoty) hardware, certified by the U.S. Department of Energy to be in accordance with Title 10, {ital Code} {ital of} {ital Federal} {ital Regulations}, Part 71 (10 CFR 71). System 140, System 160, and System 180 are nonlicensed (nonregulatory) hardware. This paper focuses on the required interfaces and sequencing of events required by these systems and the shipping and receiving facilities in preparation of the Radioisotope Thermoelectric Generator for space flight. {copyright} {ital 1995} {ital American} {ital Institute} {ital of} {ital Physics}

Reilly, M.A. [Westinghouse Hanford Company, P.O. Box 1970, MSIN N1-25, Richland, Washington 99352 (United States)

1995-01-20T23:59:59.000Z

304

Revisions to Energy Efficiency Enforcement Regulations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6450-01-P 6450-01-P DEPARTMENT OF ENERGY 10 CFR Parts 430 and 431 Docket No. EERE-2010-BT-CE-0014 RIN 1904-AC23 Revisions to Energy Efficiency Enforcement Regulations AGENCY: Office of Energy Efficiency and Renewable Energy and Office of the General Counsel, Department of Energy. ACTION: Request for Information (RFI); request for comment. SUMMARY: The U.S. Department of Energy (DOE or the "Department") intends to expand and revise its existing energy efficiency enforcement regulations for certain consumer products and commercial and industrial equipment covered under the Energy Policy and Conservation Act of 1975, as amended (EPCA or the "Act"). These regulations provide for manufacturer submission of compliance statements and

305

Last Revised: 7/23/10 (Gades  

NLE Websites -- All DOE Office Websites (Extended Search)

Revised: 7/23/10 (Gades) Revised: 7/23/10 (Gades) Instructions for Requesting Dry Ice at the APS Dry Ice requests are handled by APS Detector Pool staff. Dry ice should be requested through the Detector Pool database, similar to how detectors are requested. Dry ice is only available during normal business hours. Since dry ice must be obtained from a building other than the APS, requests must be made in advance to ensure availability of a government vehicle for transporting dry ice. Access the Detector Pool database via the link below. Requestors will be taken to a log-in page similar to the log-in page for the ESAF system. https://beam.aps.anl.gov/pls/apsweb/wam0002.dds_main_menu The page can also be found on the Optics and Detector Group homepage (the "Submit a Detector

306

Southeast Regional Clean Energy Policy Analysis (Revised)  

NLE Websites -- All DOE Office Websites (Extended Search)

Southeast Regional Clean Southeast Regional Clean Energy Policy Analysis Revised Joyce McLaren Technical Report NREL/TP-6A20-49192 Revised April 2011 ERRATA SHEET NREL REPORT/PROJECT NUMBER: TP-6A20-49192 TITLE: Southeast Regional Clean Energy Policy Analysis AUTHOR(S): Joyce McLaren ORIGINAL PUBLICATION DATE: January 2011 DATE OF CORRECTIONS (MM/YYYY): 04/2011 The following figures and tables were replaced: Page vii, Figure ES-2 Page ix, Table ES-1 Page 12, Table 1 Page 20, Figure 10 Page 51, Table 11 Page 52, Figure 18 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401

307

Bicyclic graphs with maximal revised Szeged index  

E-Print Network (OSTI)

The revised Szeged index $Sz^*(G)$ is defined as $Sz^*(G)=\\sum_{e=uv \\in E}(n_u(e)+ n_0(e)/2)(n_v(e)+ n_0(e)/2),$ where $n_u(e)$ and $n_v(e)$ are, respectively, the number of vertices of $G$ lying closer to vertex $u$ than to vertex $v$ and the number of vertices of $G$ lying closer to vertex $v$ than to vertex $u$, and $n_0(e)$ is the number of vertices equidistant to $u$ and $v$. Hansen used the AutoGraphiX and made the following conjecture about the revised Szeged index for a connected bicyclic graph $G$ of order $n \\geq 6$:

Li, Xueliang

2011-01-01T23:59:59.000Z

308

Coal within a revised energy perspective  

SciTech Connect

The author considers the use of coal within a revised energy perspective, focusing on the factors that will drive which fuels are used to generate electricity going forward. He looks at the world markets for fossil fuels and the difficulties of predicting oil and natural gas supply and prices, as demonstrated by the variability in projections from one year to another in the EIA's Annual Energy Outlook. 4 refs., 1 tab.

Darmstadter, J. [Resources for the Future (RFF), Washington, DC (United States)

2006-07-15T23:59:59.000Z

309

Nevada Test Site waste acceptance criteria [Revision 1  

SciTech Connect

Revision one updates the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive and mixed waste for disposal; and transuranic and transuranic mixed waste for interim storage at the NTS. Review each section of this document. This document is not intended to include all of the requirements; rather, it is meant as a guide toward meeting the regulations. All references in this document should be observed to avoid omission of requirements on which acceptance or rejection of waste will be based. The Department of Energy/Nevada Operations Office (DOE/NV) and support contractors are available to assist you in understanding or interpreting this document.

None

1997-08-01T23:59:59.000Z

310

Defense Waste Processing Facility wasteform and canister description: Revision 2  

SciTech Connect

This document describes the reference wasteform and canister for the Defense Waste Processing Facility (DWPF). The principal changes include revised feed and glass product compositions, an estimate of glass product characteristics as a function of time after the start of vitrification, and additional data on glass leaching performance. The feed and glass product composition data are identical to that described in the DWPF Basic Data Report, Revision 90/91. The DWPF facility is located at the Savannah River Plant in Aiken, SC, and it is scheduled for construction completion during December 1989. The wasteform is borosilicate glass containing approximately 28 wt % sludge oxides, with the balance consisting of glass-forming chemicals, primarily glass frit. Borosilicate glass was chosen because of its stability toward reaction with potential repository groundwaters, its relatively high ability to incorporate nuclides found in the sludge into the solid matrix, and its reasonably low melting temperature. The glass frit contains approximately 71% SiO/sub 2/, 12% B/sub 2/O/sub 3/, and 10% Na/sub 2/O. Tests to quantify the stability of DWPF waste glass have been performed under a wide variety of conditions, including simulations of potential repository environments. Based on these tests, DWPF waste glass should easily meet repository criteria. The canister is filled with about 3700 lb of glass which occupies 85% of the free canister volume. The filled canister will generate approximately 690 watts when filled with oxides from 5-year-old sludge and precipitate from 15-year-old supernate. The radionuclide activity of the canister is about 233,000 curies, with an estimated radiation level of 5600 rad/hour at the canister surface. 14 figs., 28 tabs.

Baxter, R.G.

1988-12-01T23:59:59.000Z

311

Yakima Fisheries Project : Revised Draft Environmental Impact Statement.  

SciTech Connect

BPA proposes to fund several fishery-related activities in the Yakima River Basin. The Yakima Fisheries Project (YFP), included in the Northwest Power Planning Council`s fish and wildlife program, would be jointly managed by the State of Washington and the Yakima Indian Nation. Fisheries resources in the Yakima River are severely reduced from historical levels and there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) the construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. The project has been considerably revised from the original proposal described in the first draft EIS. Examined in addition to No Action (which would leave present anadromous fisheries resources unchanged in the, Basin) are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of re-establishing (via stock imported from another basin) naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 has been identified as the preferred action. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

United States. Bonneville Power Administration.

1995-05-01T23:59:59.000Z

312

NV/YMP radiological control manual, Revision 2  

SciTech Connect

The Nevada Test Site (NTS) and the adjacent Yucca Mountain Project (YMP) are located in Nye County, Nevada. The NTS has been the primary location for testing nuclear explosives in the continental US since 1951. Current activities include operating low-level radioactive and mixed waste disposal facilities for US defense-generated waste, assembly/disassembly of special experiments, surface cleanup and site characterization of contaminated land areas, and non-nuclear test operations such as controlled spills of hazardous materials at the hazardous Materials (HAZMAT) Spill Center (HSC). Currently, the major potential for occupational radiation exposure is associated with the burial of low-level nuclear waste and the handling of radioactive sources. Planned future remediation of contaminated land areas may also result in radiological exposures. The NV/YMP Radiological Control Manual, Revision 2, represents DOE-accepted guidelines and best practices for implementing Nevada Test Site and Yucca Mountain Project Radiation Protection Programs in accordance with the requirements of Title 10 Code of Federal Regulations Part 835, Occupational Radiation Protection. These programs provide protection for approximately 3,000 employees and visitors annually and include coverage for the on-site activities for both personnel and the environment. The personnel protection effort includes a DOE Laboratory Accreditation Program accredited dosimetry and personnel bioassay programs including in-vivo counting, routine workplace air sampling, personnel monitoring, and programmatic and job-specific As Low as Reasonably Achievable considerations.

Gile, A.L. [comp.] [comp.

1996-11-01T23:59:59.000Z

313

Net Taxable Gasoline Gallons (Including Aviation Gasoline)  

E-Print Network (OSTI)

Net Taxable Gasoline Gallons (Including Aviation Gasoline) Period 2000 2001 (2) 2002 2003 2004 "gross" to "net" , was deemed impractical. (5) This report replaces the Gross Taxable Gasoline Gallons (Including Aviation Gasoline) report which will not be produced after December 2002. (6) The November 2007

314

New Licensing Agreement Opens Energy Patents to NGOs, Non-Profits |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Licensing Agreement Opens Energy Patents to NGOs, Non-Profits Licensing Agreement Opens Energy Patents to NGOs, Non-Profits New Licensing Agreement Opens Energy Patents to NGOs, Non-Profits February 17, 2012 - 11:20am Addthis To reduce the amount of firewood Darfur refugees need, Berkeley Lab scientist Ashok Gadgil and colleagues modified an existing cookstove design to create one that is 75 percent more energy-efficient than the three-stone stove traditionally used in Darfur, and is appropriate to the environmental conditions and food preferences of the local inhabitants. | Photo courtesy of Lawrence Berkeley National Laboratory. To reduce the amount of firewood Darfur refugees need, Berkeley Lab scientist Ashok Gadgil and colleagues modified an existing cookstove design to create one that is 75 percent more energy-efficient than the three-stone

315

The Brazilian Audit Tribunal's role in improving the federal environmental licensing process  

SciTech Connect

This article describes the role played by the Brazilian Audit Tribunal (Tribunal de Contas da Uniao - TCU) in the external auditing of environmental management in Brazil, highlighting the findings of an operational audit conducted in 2007 of the federal environmental licensing process. Initially, it records the constitutional and legal framework of Brazilian environmental licensing, describing the powers and duties granted to federal, state and municipal institutions. In addition, it presents the responsibilities of the TCU in the environmental area, comparing these with those of other Supreme Audit Institutions (SAI) that are members of the International Organization of Supreme Audit Institutions (INTOSAI). It also describes the work carried out in the operational audit of the Brazilian environmental licensing process and its main conclusions and recommendations. Finally, it draws a parallel between the findings and recommendations made in Brazil with those of academic studies and audits conducted in other countries.

Lima, Luiz Henrique, E-mail: luizhlima@terra.com.b [Rio de Janeiro Federal University, Alberto Luiz Coimbra Postgraduate Institute of Engineering Research, Energy Planning Program (Brazil); Magrini, Alessandra, E-mail: ale@ppe.ufrj.b [Rio de Janeiro Federal University, Alberto Luiz Coimbra Postgraduate Institute of Engineering Research, Energy Planning Program (Brazil); Centro de Tecnologia - Bloco C Sala 211, Ilha do Fundao, 21949-900 - Rio de Janeiro, Caixa-Postal: 68565, RJ (Brazil)

2010-02-15T23:59:59.000Z

316

Final Revised Environmental Assessment for The Proposed Construction and Operation of a Biosafety Level 3 Facility at Lawrence Livermore National Laboratory, Livermore, California  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

R R Final Revised Environmental Assessment for The Proposed Construction and Operation of a Biosafety Level 3 Facility at Lawrence Livermore National Laboratory, Livermore, California Issued: December 2002 Revised: January 2008 Department of Energy National Nuclear Security Administration Livermore Site Office This page intentionally left blank. FINAL Revised EA for the Proposed Construction and Operation of a Biosafety Level 3 Facility at LLNL ii FORWARD The National Nuclear Security Administration (NNSA) of the Department of Energy (DOE) has responsibility for national programs to reduce and counter threats from weapons of mass destruction including nuclear, chemical, and biological weapons (bioweapons). NNSA's bioscience work at Lawrence Livermore National Laboratory (LLNL) in support of these

317

Technical support document for proposed 1994 revision of the MEC thermal envelope requirements  

SciTech Connect

This report documents the development of the proposed revision of the Council of American Building Officials` (CABO) 1994 supplement to the 1993 Model Energy Code (MEC) building thermal envelope requirements for maximum component U{sub 0}-value. The 1994 amendments to the 1993 MEC were established in last year`s code change cycle and did not change the envelope requirements. The research underlying the proposed MEC revision was conducted by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE) Building Energy Standards program. The goal of this research was to develop revised guidelines based on an objective methodology that determines the most cost-effective (least total cost) combination of energy conservation measures (ECMs) (insulation levels and window types) for residential buildings. This least-cost set of ECMs was used as a basis for proposing revised MEC maximum U{sub 0}-values (thermal transmittances). ECMs include window types (for example, double-pane vinyl) and insulation levels (for example, R-19) for ceilings, walls, and floors.

Conner, C.C.; Lucas, R.G.

1994-03-01T23:59:59.000Z

318

Monitoring well plugging and abandonment plan, Y-12 Plant, Oak Ridge, Tennessee (revised)  

SciTech Connect

Plugging and abandonment (P&A) of defunct groundwater monitoring wells is a primary element of the Oak Ridge Y-12 Plant Groundwater Protection Program (GWPP) (AJA Technical Services, Inc. 1996). This document is the revised groundwater monitoring well P&A plan for the U.S. Department of Energy (DOE) Y-12 Plant located in Oak Ridge, Tennessee. This plan describes the systematic approach employed by Y-12 Plant GWPP to identify wells that require P&A, the technical methods employed to perform P&A activities, and administrative requirements. Original documentation for Y-12 Plant GWPP groundwater monitoring well P&A was provided in HSW, Inc. (1991). The original revision of the plan specified that a comprehensive monitoring well P&A was provided in HSW, Inc. (1991). The original revision of the plan specified that a comprehensive monitoring well P&A schedule be maintained. Wells are added to this list by issuance of both a P&A request and a P&A addendum to the schedule. The current Updated Subsurface Data Base includes a single mechanism to track the status of monitoring wells. In addition, rapid growth of the groundwater monitoring network and new regulatory requirements have resulted in constant changes to the status of wells. As a result, a streamlined mechanism to identify and track monitoring wells scheduled for P&A has been developed and the plan revised to formalize the new business practices.

NONE

1997-05-01T23:59:59.000Z

319

Special Analysis: Revision of Saltstone Vault 4 Disposal Limits (U)  

SciTech Connect

New disposal limits have been computed for Vault 4 of the Saltstone Disposal Facility based on several revisions to the models in the existing Performance Assessment and the Special Analysis issued in 2002. The most important changes are the use of a more rigorous groundwater flow and transport model, and consideration of radon emanation. Other revisions include refinement of the aquifer mesh to more accurately model the footprint of the vault, a new plutonium chemistry model accounting for the different transport properties of oxidation states III/IV and V/VI, use of variable infiltration rates to simulate degradation of the closure system, explicit calculation of gaseous releases and consideration of the effects of settlement and seismic activity on the vault structure. The disposal limits have been compared with the projected total inventory expected to be disposed in Vault 4. The resulting sum-of-fractions of the 1000-year disposal limits is 0.2, which indicates that the performance objectives and requirements of DOE 435.1 will not be exceeded. This SA has not altered the conceptual model (i.e., migration of radionuclides from the Saltstone waste form and Vault 4 to the environment via the processes of diffusion and advection) of the Saltstone PA (MMES 1992) nor has it altered the conclusions of the PA (i.e., disposal of the proposed waste in the SDF will meet DOE performance measures). Thus a PA revision is not required and this SA serves to update the disposal limits for Vault 4. In addition, projected doses have been calculated for comparison with the performance objectives laid out in 10 CFR 61. These doses are 0.05 mrem/year to a member of the public and 21.5 mrem/year to an inadvertent intruder in the resident scenario over a 10,000-year time-frame, which demonstrates that the 10 CFR 61 performance objectives will not be exceeded. This SA supplements the Saltstone PA and supersedes the two previous SAs (Cook et al. 2002; Cook and Kaplan 2003).

Cook, J

2005-05-26T23:59:59.000Z

320

Preparing to Submit a License Application for Yucca Mountain  

SciTech Connect

In 1982, the U.S. Congress passed the Nuclear Waste Policy Act, a Federal law that established U.S. policy for the permanent disposal of spent nuclear fuel and high-level radioactive waste. Congress amended the Act in 1987, directing the Department of Energy to study only Yucca Mountain, Nevada as the site for a permanent geologic repository. As the law mandated, the Department evaluated Yucca Mountain to determine its suitability as the site for a permanent geologic repository. Decades of scientific studies demonstrated that Yucca Mountain would protect workers, the public, and the environment during the time that a repository would be operating and for tens of thousands of years after closure of the repository. A repository at this remote site would also: preserve the quality of the environment; allow the environmental cleanup of Cold War weapons facilities; provide the nation with additional protection from acts of terrorism; and support a sound energy policy. Throughout the scientific evaluation of Yucca Mountain, there has been no evidence to disqualify Yucca Mountain as a suitable site for the permanent disposal of spent nuclear fuel and high-level radioactive waste. Upon completion of site characterization, the Secretary of Energy considered the results and concluded that a repository at Yucca Mountain would perform in a manner that protects public health and safety. The Secretary recommended the site to the President in February 2002; the President agreed and recommended to Congress that the site be approved. The Governor of Nevada submitted a notice of disapproval, and both houses of Congress acted to override the disapproval. In July 2002, the President's approval allowed the Department to begin the process of submittal of a license application for Yucca Mountain as the site for the nation's first repository for spent nuclear fuel and high-level radioactive waste. Yucca Mountain is located on federal land in Nye County in southern Nevada, an arid region of the United States, approximately 100 miles (160 kilometers) northwest of Las Vegas (Figure 1). The location is remote from population centers, and there are no permanent residents within approximately 14 miles (23 km) of the site. Overall, Nye County has a population density of about two persons per square mile (two persons per 2.5 square km); in the vicinity of Yucca Mountain, it is significantly less. Yucca Mountain is a series of north-south-trending ridges extending approximately 25 miles (40 km), and consists of successive layers of fine-grained volcanic tuffs, millions of years old, underlain by older carbonate rocks. The alternating layers of welded and nonwelded volcanic tuffs have differing hydrologic properties that significantly impact the manner in which water moves through the mountain. The repository horizon will be in welded tuff located in the unsaturated zone, more than 1,000 feet (300 meters) above the water table in the present-day climate, and is expected to remain well above the water table during wetter future climate conditions. Future meteorology and climatology at Yucca Mountain are important elements in understanding the amount of water available to potentially interact with the waste.

W.J. Arthur; M.D. Voegele

2005-03-14T23:59:59.000Z

Note: This page contains sample records for the topic "include revised licensing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Gas storage materials, including hydrogen storage materials  

DOE Patents (OSTI)

A material for the storage and release of gases comprises a plurality of hollow elements, each hollow element comprising a porous wall enclosing an interior cavity, the interior cavity including structures of a solid-state storage material. In particular examples, the storage material is a hydrogen storage material, such as a solid state hydride. An improved method for forming such materials includes the solution diffusion of a storage material solution through a porous wall of a hollow element into an interior cavity.

Mohtadi, Rana F; Wicks, George G; Heung, Leung K; Nakamura, Kenji

2014-11-25T23:59:59.000Z

322

Flambeau River Papers Makes a Comeback with a Revised Energy...  

Office of Environmental Management (EM)

ITP LEADER Case Study: Flambeau River Papers Makes a Comeback With a Revised Energy Strategy Flambeau River Biofuels Demonstration-Scale Biorefinery FlambeauRiverBiofuels.pdf...

323

Ohio Coalbed Methane Proved Reserves Revision Increases (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

W Withheld to avoid disclosure of individual company data. Release Date: 1242014 Next Release Date: 12312015 Referring Pages: Coalbed Methane Reserves Revision Increases...

324

,"U.S. Coalbed Methane Proved Reserves Revision Increases (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","U.S. Coalbed Methane Proved Reserves Revision Increases (Billion Cubic Feet)",1,"Annual",2013...

325

,"U.S. Coalbed Methane Proved Reserves Revision Decreases (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","U.S. Coalbed Methane Proved Reserves Revision Decreases (Billion Cubic Feet)",1,"Annual",2013...

326

,"New York Dry Natural Gas Reserves Revision Decreases (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","New York Dry Natural Gas Reserves Revision Decreases (Billion Cubic Feet)",1,"Annual",2012...

327

,"New York Dry Natural Gas Reserves Revision Increases (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","New York Dry Natural Gas Reserves Revision Increases (Billion Cubic Feet)",1,"Annual",2012...

328

Draft Revised Guidelines for Implementing Executive Order 11988, "Floodplain Management"  

Energy.gov (U.S. Department of Energy (DOE))

The Federal Emergency Management Agency published the draft Revised Guidelines for Implementing Executive Order 11988, Floodplain Management for public review and comment on January 30, 2015.

329

The mixed waste management facility. Project baseline revision 1.2  

SciTech Connect

Revision 1.2 to the Project Baseline (PB) for the Mixed Waste Management Facility (MWMF) is in response to DOE directives and verbal guidance to (1) Collocate the Decontamination and Waste Treatment Facility (DWTF) and MWMF into a single complex, integrate certain and overlapping functions as a cost-saving measure; (2) Meet certain fiscal year (FY) new-BA funding objectives ($15.3M in FY95) with lower and roughly balanced funding for out years; (3) Reduce Total Project Cost (TPC) for the MWMF Project; (4) Include costs for all appropriate permitting activities in the project TPC. This baseline revision also incorporates revisions in the technical baseline design for Molten Salt Oxidation (MSO) and Mediated Electrochemical Oxidation (MEO). Changes in the WBS dictionary that are necessary as a result of this rebaseline, as well as minor title changes, at WBS Level 3 or above (DOE control level) are approved as a separate document. For completeness, the WBS dictionary that reflects these changes is contained in Appendix B. The PB, with revisions as described in this document, were also the basis for the FY97 Validation Process, presented to DOE and their reviewers on March 21-22, 1995. Appendix C lists information related to prior revisions to the PB. Several key changes relate to the integration of functions and sharing of facilities between the portion of the DWTF that will house the MWMF and those portions that are used by the Hazardous Waste Management (HWM) Division at LLNL. This collocation has been directed by DOE as a cost-saving measure and has been implemented in a manner that maintains separate operational elements from a safety and permitting viewpoint. Appendix D provides background information on the decision and implications of collocating the two facilities.

Streit, R.D.; Throop, A.L.

1995-04-01T23:59:59.000Z

330

Intentionally Including - Engaging Minorities in Physics Careers |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Intentionally Including - Engaging Minorities in Physics Careers Intentionally Including - Engaging Minorities in Physics Careers Intentionally Including - Engaging Minorities in Physics Careers April 24, 2013 - 4:37pm Addthis Joining Director Dot Harris (second from left) were Marlene Kaplan, the Deputy Director of Education and director of EPP, National Oceanic and Atmospheric Administration, Claudia Rankins, a Program Officer with the National Science Foundation and Jim Stith, the past Vice-President of the American Institute of Physics Resources. Joining Director Dot Harris (second from left) were Marlene Kaplan, the Deputy Director of Education and director of EPP, National Oceanic and Atmospheric Administration, Claudia Rankins, a Program Officer with the National Science Foundation and Jim Stith, the past Vice-President of the

331

Scramjet including integrated inlet and combustor  

SciTech Connect

This patent describes a scramjet engine. It comprises: a first surface including an aft facing step; a cowl including: a leading edge and a trailing edge; an upper surface and a lower surface extending between the leading edge and the trailing edge; the cowl upper surface being spaced from and generally parallel to the first surface to define an integrated inlet-combustor therebetween having an inlet for receiving and channeling into the inlet-combustor supersonic inlet airflow; means for injecting fuel into the inlet-combustor at the step for mixing with the supersonic inlet airflow for generating supersonic combustion gases; and further including a spaced pari of sidewalls extending between the first surface to the cowl upper surface and wherein the integrated inlet-combustor is generally rectangular and defined by the sidewall pair, the first surface and the cowl upper surface.

Kutschenreuter, P.H. Jr.; Blanton, J.C.

1992-02-04T23:59:59.000Z

332

Transmission line including support means with barriers  

DOE Patents (OSTI)

A gas insulated transmission line includes an elongated outer sheath, a plurality of inner conductors disposed within and extending along the outer sheath, and an insulating gas which electrically insulates the inner conductors from the outer sheath. A support insulator insulatably supports the inner conductors within the outer sheath, with the support insulator comprising a main body portion including a plurality of legs extending to the outer sheath, and barrier portions which extend between the legs. The barrier portions have openings therein adjacent the main body portion through which the inner conductors extend.

Cookson, Alan H. (Pittsburgh, PA)

1982-01-01T23:59:59.000Z

333

File:03MTDLandUseLicenseProcess (1).pdf | Open Energy Information  

Open Energy Info (EERE)

MTDLandUseLicenseProcess (1).pdf MTDLandUseLicenseProcess (1).pdf Jump to: navigation, search File File history File usage File:03MTDLandUseLicenseProcess (1).pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 24 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 12:05, 1 October 2012 Thumbnail for version as of 12:05, 1 October 2012 1,275 × 1,650 (24 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following 2 pages link to this file: GRR/Flowcharts GRR/Section 3-MT-d - Land Use License Process

334

Business Ymwet Centlsaem: Enclosed is AEC Special Nuclear Material License Yo. SW-551, as  

Office of Legacy Management (LM)

c-ii 3-y c-ii 3-y !WL?DF!i 70.424 SW-551, 9s renewed AUG 9 196s cmhustian En&merin~, Inc. %.lelcar Division tYindter, Connecticut ,~ttentionr ?tr. 5. ff. Shfp,penbmg: Business Ymwet Centlsaem: Enclosed is AEC Special Nuclear Material License Yo. SW-551, as renewed. Very tTuly yours, fkmald A. Nusshauaer, Chief Saurce 4 Specfel Wcleer Yaterials Brmch Ofvision of Meterbls Licensing EnClOSUWl W W m , as renwed DISTRIBUTION: Ccaplianee, HQs 2 w/encl. H. j. McAlduff, OR00 w/encl. D. George, ?MM w/mcl. N. Dtilos, ML w/emCl, C. Luke, ML w/end. Br. RF w/encl. Div. RF w/o encl. UNITED STATES ATOMIC ENERGY COMMISSION SPECIAL NUCLEAR MATERIAL LICENSE Pursuant to the Atomic Energy Act of 1954 and Title 10, Code of Federal Regulations, Chapter 1, Part 70, "Special Nuclear Material Regulations," a license is hereby issued authorizing the licensee

335

2012 Old City Publishing, Inc. Published by license under the OCP Science imprint,  

E-Print Network (OSTI)

©2012 Old City Publishing, Inc. Published by license under the OCP Science imprint, a member and Computer Engineering, The Johns Hopkins University, 3400 North Charles Street, Baltimore, MD 21218, USA We briefly review the pilot ideas on the generation of electromagnetic (EM)-pulses much shorter than already

Kaplan, Alexander

336

PATENTING AND LICENSING The major thrust of the Technology Transfer Office's activity is directed towards  

E-Print Network (OSTI)

PATENTING AND LICENSING The major thrust of the Technology Transfer Office's activity that he or she may have created an invention, to promptly report it to the Technology Transfer Office. 2. Patentability Determination After the invention is reported to the Technology Transfer Office

337

MCM2-7 Form Double Hexamers at Licensed Origins in Xenopus Egg Extract*S  

E-Print Network (OSTI)

the origin recog- nition complex (ORC)4 binds to DNA at the origin, and DNA- bound ORC then recruits the Cdt1- and Cdc6-licensing pro- teins. Finally, in an ATP-consuming reaction ORC, Cdc6 and Cdt1 cooperate to load

Blow, J. Julian

338

INDEX of PADSTE HIGHLIGHTS June 3, 2009 Helper plasmid display technology licensed  

E-Print Network (OSTI)

CHEMISTRY X-ray radiography of internal, subsonic burning of explosives EARTH AND ENVIRONMENTAL SCIENCES Low of radioactive waste forms PHYSICS New microfluidics facility in P-23 THEORETICAL Mathematical regularities the licensing effort for this technology. CHEMISTRY X-ray radiography of internal, subsonic burning

339

Licensing Uncertain Patents: Per-Unit Royalty vs. Up-Front Fee  

E-Print Network (OSTI)

Licensing Uncertain Patents: Per-Unit Royalty vs. Up-Front Fee David Encaouay and Yassine Lefouiliz schemes are investigated: the per-unit royalty rate and the up-front fee. We provide conditions under-unit royalty scheme, the opportunity to do so does not exist under the up-front fee scheme. We also establish

Boyer, Edmond

340

Journal of Mathematical Economics 21 (1992) 483-508. North-Holland Optimal licensing  

E-Print Network (OSTI)

royalty in terms of the patentee's profit, licensees' profit, industry structure, and the product's price of a royalty is inferior to the other modes, both for consumers and the patentee. The firms' profits decline, or for a per unit royalty. Early work on licensing of cost reducing innovation can be traced back to Arrow

Oren, Shmuel S.

Note: This page contains sample records for the topic "include revised licensing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

POLICY STATEMENT University of Georgia Research Foundation, Inc. Policy on Equity Acquisition in Licensing  

E-Print Network (OSTI)

POLICY STATEMENT University of Georgia Research Foundation, Inc. Policy on Equity Acquisition the interests of the company over their responsibilities to UGARF and the University of Georgia. This Policy with this Policy. II. Policy In the course of intellectual property licensing, UGARF, through the work of TCO, may

Arnold, Jonathan

342

ECONOMIC MODELING OF RE-LICENSING AND DECOMMISSIONING OPTIONS FOR THE  

E-Print Network (OSTI)

ECONOMIC MODELING OF RE-LICENSING AND DECOMMISSIONING OPTIONS FOR THE KLAMATH BASIN HYDROELECTRIC, and steelhead trout on the West Coast of the United States. PacifiCorp's 169-megawatt Klamath Hydroelectric Hydroelectric Project is the only thorough, objective and transparent assessment tool that analyzes the cost

343

Energy Consumption of Personal Computing Including Portable  

E-Print Network (OSTI)

Energy Consumption of Personal Computing Including Portable Communication Devices Pavel Somavat1 consumption, questions are being asked about the energy contribution of computing equipment. Al- though studies have documented the share of energy consumption by this type of equipment over the years, research

Namboodiri, Vinod

344

EE Regional Technology Roadmap Includes comparison  

E-Print Network (OSTI)

EE Regional Technology Roadmap Includes comparison against 6th Power Plan (Update cyclically Roadmap with a strong linkage to utility programs Scan for Technologies 1. How does it address the NW Data Clearinghouse BPA/RTF NEEA/Regional Programs Group Update Regional EE Technology Roadmap Lighting

345

Video Topics Include Freshman Inquiry Course  

E-Print Network (OSTI)

Video Topics Include Freshman Inquiry Course Open Advisement/ Group Advisement Dinning Campus: End of Spring 2012, Commencement May 18: Grades available on MAX after 4:30pm AdvisementYouTubeVideoSeries I N S I D E T H I S I S S U E : YouTube Video Series 1 Mark Your Calendar 1 Exploring Major Tips 2

Hardy, Christopher R.

346

Including Ocean Model Uncertainties in Climate Predictions  

E-Print Network (OSTI)

Including Ocean Model Uncertainties in Climate Predictions Chris Brierley, Alan Thorpe, Mat Collins's to perform the integrations Currently uses a `slab' ocean #12;An Ocean Model Required to accurately model transient behaviour Will have its own uncertainties Requires even more computing power Create new models

Jones, Peter JS

347

Strategic Basis for License Application Planning for a Potential Yucca Mountain Repository  

SciTech Connect

If Yucca Mountain, Nevada is designated as the site for development of a geologic repository for disposal of spent nuclear fuel and high-level radioactive waste, the Department of Energy (DOE) must obtain Nuclear Regulatory Commission (NRC) approval first for repository construction, then for an operating license, and, eventually, for repository closure and decommissioning. The licensing criteria defined in Code of Federal Regulations, Title 10, Part 63 (10 CFR Part 63) establish the basis for these NRC decisions. Submittal of a license application (LA) to the NRC for authorization to construct a repository at the Yucca Mountain site is, at this point, only a potential future action by the DOE. The policy process defined in the Nuclear Waste Policy Act (NWPA), as amended, for recommendation and designation of Yucca Mountain as a repository site makes it difficult to predict whether or when the site might be designated. The DOE may only submit a LA to the NRC if the site designation takes effect. In spite of this uncertainty, the DOE must take prudent and appropriate action now, and over the next several years, to prepare for development and timely submittal of a LA. This is particularly true given the need for the DOE to develop, load, and certify the operation of its electronic information system to provide access to its relevant records as part of the licensing support network (LSN) in compliance with NRC requirements six months prior to LA submittal. The DOE must also develop a LA, which is a substantially different document from those developed to support a Site Recommendation (SR) decision. The LA must satisfy NRC licensing criteria and content requirements, and address the acceptance criteria defined by the NRC in its forthcoming Yucca Mountain Review Plan (YMRP). The content of the LA must be adequate to facilitate NRC acceptance and docketing for review, and the LA and its supporting documents must provide the documented basis for the NR C findings required for a construction authorization. The LA must also support a licensing proceeding before an Atomic Safety and Licensing Board panel prior to NRC action on any decision to authorize construction. The DOE has established a strategic basis for planning that is intended to provide the framework for development of an integrated plan for activities leading to preparation and submittal of a LA.

Newberry, C. M.; Brocoum, S. J.; Gamble, R. P.; Murray, R. C.; Cline, M.

2002-02-26T23:59:59.000Z

348

Minor Revision to Masters Program in Applied Social Psychology  

E-Print Network (OSTI)

Minor Revision to Masters Program in Applied Social Psychology 1. Proposal Identification 1 1. Department contact person: Dr. Peter Grant Applied Social Psychology Program Coordinator Department of Psychology Tel: 966-6675 Fax: 966-6630 E-mail: peter.qrant(usaskca · Name of Revised Program: Masters program

Saskatchewan, University of

349

Revised: March 1, 2005 Page 1 UCSB Environmental Health & Safety  

E-Print Network (OSTI)

safe for transport. #12;Revised: March 1, 2005 Page 3 · Abandoned and unlabeled chemical containersRevised: March 1, 2005 Page 1 UCSB Environmental Health & Safety Emergency Response Guidelines spill-cleanups, odor complaints, pickup of abandoned chemicals and related alarms (see Attachment). EH

Bigelow, Stephen

350

Development of Revised Energy Standards for Texas Buildings: Preliminary Results  

E-Print Network (OSTI)

for Energy Studies (CES) at The University of Texas at Austin is revising and updating the nonresidential building portion of the Energy Conservation Manual. The proposed revision is a Texas-specific adaptation of ASHRAE Standard 90.1P ("Energy Efficient...

Hunn, B. D.; Jones, J. W.; Silver, S. C.

1988-01-01T23:59:59.000Z

351

Revision Date 01.11.13 PROCUREMENT SERVICES -LOGISTICS  

E-Print Network (OSTI)

Revision Date 01.11.13 PROCUREMENT SERVICES - LOGISTICS Reading and Reconciling an ePro and MMD with your FACSID. Prerequisites: None Find Help: Email logistics_team@unc.edu #12;Procurement Services - Logistics Reading and Reconciling an ePro and MMD Statement Revision Date 01.11.13 Page 2 of 6 Departmental

Crews, Stephen

352

1 INTRODUCTION Japanese standard Law was revised in 1998. The  

E-Print Network (OSTI)

a situation which does not comply with other requirements of the Building Standard Law, concerning fire safety, Ministry of Construction, Japan ABSTRACT: Japanese Building Standard Law was revised in 1998. The highlight1 INTRODUCTION Japanese standard Law was revised in 1998. The highlight related to the structural

Spencer Jr., B.F.

353

Revised 1997 Retail Electricity Price Forecast Principal Author: Ben Arikawa  

E-Print Network (OSTI)

Revised 1997 Retail Electricity Price Forecast March 1998 Principal Author: Ben Arikawa Electricity 1997 FORE08.DOC Page 1 CALIFORNIA ENERGY COMMISSION ELECTRICITY ANALYSIS OFFICE REVISED 1997 RETAIL ELECTRICITY PRICE FORECAST Introduction The Electricity Analysis Office of the California Energy Commission

354

Revised October 2013 JO RAE WRIGHT FELLOWSHIP for  

E-Print Network (OSTI)

Revised October 2013 JO RAE WRIGHT FELLOWSHIP for OUTSTANDING WOMEN in SCIENCE Application for Academic Year 2014-2015 The Jo Rae Wright Fellowship for Outstanding Women in Science was created in memory the deadline published online will not be accepted. #12;Revised October 2013 JO RAE WRIGHT FELLOWSHIP (choose

Ferrari, Silvia

355

Buildings Included on EMS Reports"  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Legacy Management Office of Legacy Management Buildings Included on EMS Reports" "Site","Property Name","Property ID","GSF","Incl. in Water Baseline (CY2007)","Water Baseline (sq. ft.)","Water CY2008 (sq. ft.)","Water CY2009 (sq. ft.)","Water Notes","Incl. in Energy Baseline (CY2003)","Energy Baseline (sq. ft.)","CY2008 Energy (sq. ft.)","CY2009 Energy (sq. ft.)","Energy Notes","Included as Existing Building","CY2008 Existing Building (sq. ft.)","Reason for Building Exclusion" "Column Totals",,"Totals",115139,,10579,10579,22512,,,3183365,26374,115374,,,99476 "Durango, CO, Disposal/Processing Site","STORAGE SHED","DUD-BLDG-STORSHED",100,"no",,,,,"no",,,,"OSF","no",,"Less than 5,000 GSF"

356

Power generation method including membrane separation  

DOE Patents (OSTI)

A method for generating electric power, such as at, or close to, natural gas fields. The method includes conditioning natural gas containing C.sub.3+ hydrocarbons and/or acid gas by means of a membrane separation step. This step creates a leaner, sweeter, drier gas, which is then used as combustion fuel to run a turbine, which is in turn used for power generation.

Lokhandwala, Kaaeid A. (Union City, CA)

2000-01-01T23:59:59.000Z

357

Completion strategy includes clay and precipitate control  

SciTech Connect

This article describes the conditions which are necessary for a successful oil well completion in the Mississippi and Cherokee zones of South Central Kansas. Topics considered include paraffin precipitation, clay swelling and migration, and iron precipitation. Clays in these zones are sensitive to water-base treating fluids and tend to swell and migrate to the well bore, thereby causing permeability damage. The presence of iron in the Mississippi and Cherokee formations has been indicated by cuttings, core samples, and connate water samples.

Sandy, T.; Gardner, G.R.

1985-05-06T23:59:59.000Z

358

Jet-calculus approach including coherence effects  

Science Journals Connector (OSTI)

We show how integrodifferential equations typical of jet calculus can be combined with an averaging procedure to obtain jet-calculus-based results including the Mueller interference graphs. Results in longitudinal-momentum fraction x for physical quantities are higher at intermediate x and lower at large x than with the conventional incoherent jet calculus. These results resemble those of Marchesini and Webber, who used a Monte Carlo approach based on the same dynamics.

L. M. Jones; R. Migneron; K. S. S. Narayanan

1987-01-01T23:59:59.000Z

359

Energy Department Revises NEPA Regulations to Improve Efficiency |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Revises NEPA Regulations to Improve Efficiency Revises NEPA Regulations to Improve Efficiency Energy Department Revises NEPA Regulations to Improve Efficiency October 3, 2011 - 12:39pm Addthis Washington, D.C. -- The U.S. Department of Energy will save time and money in its environmental reviews of many proposed energy projects under revised regulations approved September 27, 2011, to implement the National Environmental Policy Act (NEPA). The revisions focus on the Department's categorical exclusion provisions, and reflect the first update to these provisions in 15 years. A categorical exclusion applies to a class of actions that an agency has determined normally do not individually or cumulatively have a significant impact on the human environment. "Updating our NEPA rule allows us to accomplish our environmental reviews

360

Revision of DOE Manual 460.2-1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2005 , 2005 TEC/WG 1 Revision of DOE M 460.2-1, Radioactive Material Transportation Practices Manual Revision of DOE M 460.2-1, Radioactive Material Transportation Practices Manual Ella McNeil Office of Transportation, EM-11 September 20, 2005 TEC/WG 2 Getting Started Getting Started * Establish an internal writing team, lead by EM: - Field Representatives - Naval Reactors - NNSA - RW * Kick-off on August 3 (conference call) * Second conference call on Sept. 8 September 20, 2005 TEC/WG 3 Proposed Revision Timeline Proposed Revision Timeline Writing team completes new draft of Manual 1/06 Begin informal DOE review of revised Manual (field, GC, PSOs) 2/06 (3 weeks) Comment resolution by writing team complete, provide draft to internal management for review 3/06 (2 weeks) Draft Manual is provided to SRGs

Note: This page contains sample records for the topic "include revised licensing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

EIS-0286: Revised Draft Environmental Import Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Revised Draft Environmental Import Statement 6: Revised Draft Environmental Import Statement EIS-0286: Revised Draft Environmental Import Statement Richland Operations Office, Hanford Site Solid (Radioactive and Hazardous) Waste Program, Richland, Washington The revised draft of the Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement (HSW EIS) provides environmental and technical information concerning U.S. Department of Energy (DOE) proposed waste management practices at the Hanford Site. DOE/EIS-0286, Richland Operations Office, Revised Draft Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement, Richland, Washington - Summary (March 2003) EIS-0286-D2-DEIS-01-2003.pdf EIS-0286-D2-DEIS-02-2003_0.pdf More Documents & Publications

362

Established and Revised Federal Agency NEPA Procedures, 2000 - 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Revised Federal Agency NEPA Procedures, 2000 - 2011 and Revised Federal Agency NEPA Procedures, 2000 - 2011 ` Established and Revised Federal Agency NEPA Procedures Last Updated on January 11, 2013 Department/Agency Action Title/Citation Federal Register Notice(s) 2000 Department of Health and Human Services Revised NEPA Procedures Revised General Administration Manual, HHS Part 30, Environmental Protection Published for comment on January 11, 1999 (64 Federal Register [FR] 1655). Published as final procedures on February 25, 2000 (65 FR 10229). Bureau of Reclamation Department of the Interior Notice of Availability of a Draft Agency Handbook on the National Environmental Policy Act Department Manual (DM) Part 516, Chapter 6: Managing the NEPA Process (Appendix 7) Published on April 20, 2000 (65 FR 21210) with

363

Microsoft Word - Creston-Bell Revision Sheet__final.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Revision Sheet for Final Environmental Assessment Revision Sheet for Final Environmental Assessment Creston-Bell Transmission Line Rebuild Project Department of Energy Bonneville Power Administration Revision Sheet DOE/EA-4406 Summary Bonneville Power Administration (BPA) released the Creston-Bell Transmission Line Rebuild Project Preliminary Environmental Assessment (EA) in April 2012 for public comment. BPA sent the Preliminary EA to agencies and interested parties. Notification that the EA was available and how to request a copy was sent to all others on the mailing list of potentially affected parties. BPA received six comments and responded to these comments in this revision sheet. This revision sheet documents the changes to be incorporated into the EA. The Preliminary EA, with the addition of these changes, constitutes the Final EA, which will not be reprinted.

364

Notice, Revised Classified Information Nondisclosure Agreement - July 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice, Revised Classified Information Nondisclosure Agreement - Notice, Revised Classified Information Nondisclosure Agreement - July 2013 Notice, Revised Classified Information Nondisclosure Agreement - July 2013 August 29, 2013 - 4:19pm Addthis Notice, Revised Classified Information Nondisclosure Agreement - July 2013 The "Classified Information Nondisclosure Agreement, Standard Form 312" (SF 312) was revised in July 2013 by the Office of the Director of National Intelligence (ODNI) to conform with two new federal statutes: The Financial Services and General Government Appropriations Act (Public Law 112-74); and Whistleblower Protection Enhancement Act (WPEA) (Public Law 112-199). The WPEA strengthens protections for federal employees who disclose evidence of waste, fraud, or abuse. The WPEA requires that each agreement

365

Waste lubricating oil: an annotated review. 1982 revision  

SciTech Connect

Because of renewed interest in waste oil, both in terms of energy conservation and as a threat to the environment, there appears to be a need for a systemic compilation of information on the subject. This is a revision of the 1979 manuscript (BETC/IC-79/4) reflecting publications of the last three years as well as incorporation of papers that were overlooked. The number of citations has jumped from 486 to 1203, with all previous citations also listed here. The bibliography is divided into broad subject areas. The Introduction gives the history and development of the used oil reclamation industry. The General section includes the comprehensive papers that address several subjects and thus, give a capsulated overview of the used oil situation. Sources of Information and Statistical Treatments of Data tell how to obtain additional and future information and data relating to waste oil and could aid those persons interested in keeping their knowledge current. The Other Lubricating Oils section covers many of the lubricants that have the potential for recycling. The Other Oils section is divided into four sub-sections to aid the reader to find the subject of interest. The section on Related Subjects includes those sideline areas that could apply to used oil reclamation.

Cotton, F.O.

1982-10-01T23:59:59.000Z

366

Policy Flash 2013-66 Revised Merit Review Guide for Financial...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

66 Revised Merit Review Guide for Financial Assistance, JULY 2013 Policy Flash 2013-66 Revised Merit Review Guide for Financial Assistance, JULY 2013 Questions concerning this...

367

POLICY FLASH 2014-25 Revision to the Procurement Strategy Panel...  

Office of Environmental Management (EM)

5 Revision to the Procurement Strategy Panel (PSP) Briefing Process POLICY FLASH 2014-25 Revision to the Procurement Strategy Panel (PSP) Briefing Process For DOE questions...

368

EIS-0288-S1: Revision to EPA Notice of Availability Draft Supplemental...  

Energy Savers (EERE)

288-S1: Revision to EPA Notice of Availability Draft Supplemental Environmental Impact Statement EIS-0288-S1: Revision to EPA Notice of Availability Draft Supplemental...

369

Historical Sunshine and Cloud Data in the United States (revised 1991)  

NLE Websites -- All DOE Office Websites (Extended Search)

Historical Sunshine and Cloud Data in the United States (revised 1991) Historical Sunshine and Cloud Data in the United States (revised 1991) (NDP-021) DOI: 10.3334/CDIAC/cli.ndp021 data Data Investigators P. M. Steurer and T. R. Karl This data base presents monthly sunshine data from 240 U.S. stations (including Puerto Rico and nine Pacific Islands) and monthly cloud amount data from 197 U.S. stations. The longest periods of record are 1891 through 1987 for the sunshine data and 1871 through 1987 for the cloud data. The sunshine data were derived from measurements taken by a variety of sunshine-recording instruments. The cloud data were derived from land-based estimates of fractional cloud amount, which were made with observation practices that have varied during the period of record. Station number, station name, latitude, and longitude are given for all stations in each

370

The Energy Information Administration is proposing the following revisions to their electricity survey forms in 2011:  

U.S. Energy Information Administration (EIA) Indexed Site

Energy Information Administration proposed the following revisions to their electricity Energy Information Administration proposed the following revisions to their electricity survey forms in 2011: F or m E I A -411, " C oor dinated B ulk Power Supply Pr ogr am R epor t." * Change form name to "Coordinated Bulk Power Supply & Demand Program Report;" return to collecting projected reliability data on a 10-year basis as opposed to 5 years. Change "Council" to "Regional Entity" and add submission of Sub-regional level breakout of data. * Return to reporting on capacity and transmission planning for a 10-year horizon, rather than a 5-year horizon. * Adopt the current NERC 2009 Schedule 3 for summer and winter aggregated demand and supply information. Changes are as follows: Demand category additions include

371

Fig 9-revised Flowchart.xls  

Office of Legacy Management (LM)

9 9 Soil Nature and Extent AOI Identification Process d The PRG value for lead is not a calculated PRG, but rather is taken from the EPA guidance document Revised Interim Soil Lead Guidance for CERCLA Sites and RCRA Correction Action Facilities (1994). e For surface soil (0 to 0.5 ft), WRW surface soil (0 to 0.5 ft) PRGs are used. For subsurface soil (0.5 ft to a maximum depth of 209 ft), WRW subsurface soil (0.5 to 8 ft) PRGs are used. a Soil "superset" for soil samples collected from June 28, 1991 through August 22, 2005. c Soil PRGs are defined as 1 x 10 -6 WRW PRGs based on using an HI of 0.1 or a risk of 1 x 10 -6 (the more conservative of the two values was used for the PRG). b Background level is defined as the background M2SD. RI-Ready Soil Data

372

Building America House Simulation Protocols (Revised)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

House House Simulation Protocols Robert Hendron and Cheryn Engebrecht National Renewable Energy Laboratory Revised October 2010 Prepared by the National Renewable Energy Laboratory For the U.S. Department of Energy Building Technologies Program ii NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process,

373

Optical panel system including stackable waveguides  

DOE Patents (OSTI)

An optical panel system including stackable waveguides is provided. The optical panel system displays a projected light image and comprises a plurality of planar optical waveguides in a stacked state. The optical panel system further comprises a support system that aligns and supports the waveguides in the stacked state. In one embodiment, the support system comprises at least one rod, wherein each waveguide contains at least one hole, and wherein each rod is positioned through a corresponding hole in each waveguide. In another embodiment, the support system comprises at least two opposing edge structures having the waveguides positioned therebetween, wherein each opposing edge structure contains a mating surface, wherein opposite edges of each waveguide contain mating surfaces which are complementary to the mating surfaces of the opposing edge structures, and wherein each mating surface of the opposing edge structures engages a corresponding complementary mating surface of the opposite edges of each waveguide.

DeSanto, Leonard (Dunkirk, MD); Veligdan, James T. (Manorville, NY)

2007-11-20T23:59:59.000Z

374

Thermovoltaic semiconductor device including a plasma filter  

DOE Patents (OSTI)

A thermovoltaic energy conversion device and related method for converting thermal energy into an electrical potential. An interference filter is provided on a semiconductor thermovoltaic cell to pre-filter black body radiation. The semiconductor thermovoltaic cell includes a P/N junction supported on a substrate which converts incident thermal energy below the semiconductor junction band gap into electrical potential. The semiconductor substrate is doped to provide a plasma filter which reflects back energy having a wavelength which is above the band gap and which is ineffectively filtered by the interference filter, through the P/N junction to the source of radiation thereby avoiding parasitic absorption of the unusable portion of the thermal radiation energy.

Baldasaro, Paul F. (Clifton Park, NY)

1999-01-01T23:59:59.000Z

375

Critical point anomalies include expansion shock waves  

SciTech Connect

From first-principle fluid dynamics, complemented by a rigorous state equation accounting for critical anomalies, we discovered that expansion shock waves may occur in the vicinity of the liquid-vapor critical point in the two-phase region. Due to universality of near-critical thermodynamics, the result is valid for any common pure fluid in which molecular interactions are only short-range, namely, for so-called 3-dimensional Ising-like systems, and under the assumption of thermodynamic equilibrium. In addition to rarefaction shock waves, diverse non-classical effects are admissible, including composite compressive shock-fan-shock waves, due to the change of sign of the fundamental derivative of gasdynamics.

Nannan, N. R., E-mail: ryan.nannan@uvs.edu [Mechanical Engineering Discipline, Anton de Kom University of Suriname, Leysweg 86, PO Box 9212, Paramaribo, Suriname and Process and Energy Department, Delft University of Technology, Leeghwaterstraat 44, 2628 CA Delft (Netherlands); Guardone, A., E-mail: alberto.guardone@polimi.it [Department of Aerospace Science and Technology, Politecnico di Milano, Via La Masa 34, 20156 Milano (Italy); Colonna, P., E-mail: p.colonna@tudelft.nl [Propulsion and Power, Delft University of Technology, Kluyverweg 1, 2629 HS Delft (Netherlands)

2014-02-15T23:59:59.000Z

376

Complex shell model representation including antibound states  

Science Journals Connector (OSTI)

A generalization of the complex shell model formalism is presented that includes antibound states in the basis. These states, together with bound states, Gamow states, and the continuum background, represented by properly chosen scattering waves, form a representation in which all states are treated on the same footing. Two-particle states are evaluated within this formalism, and observable two-particle resonances are defined. The formalism is illustrated in the well-known case of Li11 in its bound ground state and in Ca70(g.s.), which is also bound. Both cases are found to have a halo structure. These halo structures are described within the generalized complex shell model. We investigated the formation of two-particle resonances in these nuclei, but no evidence of such resonances was found.

R. Id Betan; R. J. Liotta; N. Sandulescu; T. Vertse; R. Wyss

2005-11-30T23:59:59.000Z

377

1992 Annual Capacity Report. Revision 1  

SciTech Connect

The Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (10 CFR Part 961) requires the Department of Energy (DOE) to issue an Annual Capacity Report (ACR) for planning purposes. This report is the fifth in the series published by DOE. In May 1993, DOE published the 1992 Acceptance Priority Ranking (APR) that established the order in which DOE will allocate projected acceptance capacity. As required by the Standard Contract, the acceptance priority ranking is based on the date the spent nuclear fuel (SNF) was permanently discharged, with the owners of the oldest SNF, on an industry-wide basis, given the highest priority. The 1992 ACR applies the projected waste acceptance rates in Table 2.1 to the 1992 APR, resulting in individual allocations for the owners and generators of the SNF. These allocations are listed in detail in the Appendix, and summarized in Table 3.1. The projected waste acceptance rates for SNF presented in Table 2.1 are nominal and assume a site for a Monitored Retrievable Storage (MRS) facility will be obtained; the facility will initiate operations in 1998; and the statutory linkages between the MRS facility and the repository set forth in the Nuclear Waste Policy Act of 1982, as amended (NWPA), will be modified. During the first ten years following projected commencement of Civilian Radioactive Waste Management System (CRWMS) operation, the total quantity of SNF that could be accepted is projected to be 8,200 metric tons of uranium (MTU). This is consistent with the storage capacity licensing conditions imposed on an MRS facility by the NWPA. The annual acceptance rates provide an approximation of the system throughput and are subject to change as the program progresses.

Not Available

1993-05-01T23:59:59.000Z

378

Single-shell tank closure work plan. Revision A  

SciTech Connect

In January 1994, the Hanford Federal Facility Agreement and Conset Order (Tri-Party Agreement) was amended to reflect a revised strategy for remediation of radioactive waste in underground storage tanks. These amendments include milestones for closure of the single-shell tank (SST) operable units, to be initiated by March 2012 and completed by September 2024. This SST-CWP has been prepared to address the principal topical areas identified in Tri-Party Agreement Milestone M-45-06 (i.e., regulatory pathway, operable unit characterization, waste retrieval, technology development, and a strategy for achieving closure). Chapter 2.0 of this SST-CWP provides a brief description of the environmental setting, SST System, the origin and characteristics of SST waste, and ancillary equipment that will be remediated as part of SST operable unit closure. Appendix 2A provides a description of the hydrogeology of the Hanford Site, including information on the unsaturated sediments (vadose zone) beneath the 200 Areas Plateau. Chapter 3.0 provides a discussion of the laws and regulations applicable to closure of the SST farm operable units. Chapter 4.0 provides a summary description of the ongoing characterization activities that best align with the proposed regulatory pathway for closure. Chapter 5.0 describes aspects of the SST waste retrieval program, including retrieval strategy, technology, and sequence, potential tank leakage during retrieval, and considerations of deployment of subsurface barriers. Chapter 6.0 outlines a proposed strategy for closure. Chapter 7.0 provides a summary of the programs underway or planned to develop technologies to support closure. Ca. 325 refs.

NONE

1995-06-01T23:59:59.000Z

379

Supplemental design requirements document, Project W026. Revision 3  

SciTech Connect

This document supplements and extends the Functional Design Criteria, SP-W026-FDC-001, for the Waste Receiving and Processing Facility (WRAP), Module 1. It provides additional detailed requirements, summarizes key Westinghouse Hanford Company design guidance, and establishes baseline technical agreements to be used in definitive design of the WRAP-1 facility. Revision 3 of the Supplemental Design Requirements Document has been assigned an Impact Level of 3ESQ based on the content of the entire revision. The actual changes made from Revision 2 have an Impact Level of 3S and the basis for these changes was previously reviewed and approved per WHC correspondence No. 9355770.

Weidert, J.R.

1993-10-08T23:59:59.000Z

380

Statement by Deputy Secretary of Energy Clay Sell on NRG's License  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

by Deputy Secretary of Energy Clay Sell on NRG's by Deputy Secretary of Energy Clay Sell on NRG's License Application Statement by Deputy Secretary of Energy Clay Sell on NRG's License Application September 25, 2007 - 2:49pm Addthis "Today marks the most significant and tangible step to date, towards the construction of the first new nuclear power plant in the United States in over 30 years. DOE is confident that with NRG's reactor design selection and cooperation with their partners, General Electric and Toshiba, this project will likely result in the first of many new reactors being constructed and operated in the U.S. This reactor would join an American nuclear industry that is safe, secure and has a strong record to prove it. We look forward to the continued cooperation with industrial partners and

Note: This page contains sample records for the topic "include revised licensing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

2013 Licensed Professional's Guide to the ENERGY STAR Label for Commercial Buldings  

NLE Websites -- All DOE Office Websites (Extended Search)

The Licensed Professional's Guide: Understanding the Roles and Requirements for Verifying Commercial Building Applications for ENERGY STAR Certification Contents Introduction 1 Verifying the Data Checklist 6 Verifying the Statement of Energy Performance 21 Verifying the Indoor Environmental Conditions 23 Appendix A: Sample Applications for ENERGY STAR Certification 27 Appendix B: Steps to Correct Information on the Data Checklist and Statement of Energy Performance 33 The Licensed Professional's Guide 1 Introduction Energy use in commercial buildings accounts for nearly 20 percent of U.S. greenhouse gas emissions at a cost of more than $100 billion per year. Through ENERGY STAR, the United States Environmental Protection Agency (EPA) works with owners and managers of our nation's

382

STATEMENT OF CONSIDERATIONS REQUEST BY CHEMICAL RESEARCH AND LICENSING COMPANY FOR AN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 12:09 FR IPL DOE CH 630 252 2??9 TO RGCP-HO P. 02/03 4 12:09 FR IPL DOE CH 630 252 2??9 TO RGCP-HO P. 02/03 * * STATEMENT OF CONSIDERATIONS REQUEST BY CHEMICAL RESEARCH AND LICENSING COMPANY FOR AN ADVANCE WAIVER OF PATENT RIGHTS UNDER DOE COOPERATIVE AGREEMENT NO- DE-FC36-04G014152; ENTITLED "ADVANCES IN PROCESS INTENSIFICATION THROUGH MULTI-FUNCTIONAL REACTOR ENGINEERING"; W(A)-04-057;CH-1227 As set out in the attached waiver petition and in subsequent discussions with DOE Patent Counsel, Chemical Research and Licensing Company (CR&L) has requested an advance waiver of domestic and foreign patent rights for all subject inventions made under the above-identified cooperative agreement by its employees and its subcontractors' employees, regardless of tier, except inventions made by subcontractors eligible to retain title to inventions

383

Argonne, Evigia finalize licensing agreement for next-gen RFID sensor  

NLE Websites -- All DOE Office Websites (Extended Search)

See related See related New RFID technology tracks and monitors nuclear materials Argonne, Evigia finalize licensing agreement for next-gen RFID sensor technology By Angela Hardin * July 16, 2012 Tweet EmailPrint System enables monitoring, tracking and securing of nuclear material ANN ARBOR, Mich. and ARGONNE, Ill. (July 16, 2012)-Evigia Systems and the U.S. Department of Energy's (DOE) Argonne National Laboratory announced today that they have finalized a licensing agreement under which Argonne's patented, application-specific radio-frequency identification (RFID) sensor/seal technology and its custom-developed ARG-US software suite will be further developed and marketed by Evigia as a comprehensive nuclear and hazardous material handling solution. The system, jointly developed by Evigia and Argonne, adds sophisticated

384

09.02.99.M0.03 Licensing and Trademark Usage Page 1 of 5 STANDARD ADMINISTRATIVE PROCEDURE  

E-Print Network (OSTI)

appropriate uses by Officially Licensed Vendors assuring that only quality products bear the University or inconsistent with the image and mission of an educational institution. University rule 07.03.01.M1 governs

385

Transuranic waste characterization sampling and analysis methods manual. Revision 1  

SciTech Connect

This Methods Manual provides a unified source of information on the sampling and analytical techniques that enable Department of Energy (DOE) facilities to comply with the requirements established in the current revision of the Transuranic Waste Characterization Quality Assurance Program Plan (QAPP) for the Waste Isolation Pilot Plant (WIPP) Transuranic (TRU) Waste Characterization Program (the Program) and the WIPP Waste Analysis Plan. This Methods Manual includes all of the testing, sampling, and analytical methodologies accepted by DOE for use in implementing the Program requirements specified in the QAPP and the WIPP Waste Analysis Plan. The procedures in this Methods Manual are comprehensive and detailed and are designed to provide the necessary guidance for the preparation of site-specific procedures. With some analytical methods, such as Gas Chromatography/Mass Spectrometry, the Methods Manual procedures may be used directly. With other methods, such as nondestructive characterization, the Methods Manual provides guidance rather than a step-by-step procedure. Sites must meet all of the specified quality control requirements of the applicable procedure. Each DOE site must document the details of the procedures it will use and demonstrate the efficacy of such procedures to the Manager, National TRU Program Waste Characterization, during Waste Characterization and Certification audits.

Suermann, J.F.

1996-04-01T23:59:59.000Z

386

Uranium hexafluoride: A manual of good handling practices. Revision 7  

SciTech Connect

The United States Enrichment Corporation (USEC) is continuing the policy of the US Department of Energy (DOE) and its predecessor agencies in sharing with the nuclear industry their experience in the area of uranium hexafluoride (UF{sub 6}) shipping containers and handling procedures. The USEC has reviewed Revision 6 or ORO-651 and is issuing this new edition to assure that the document includes the most recent information on UF{sub 6} handling procedures and reflects the policies of the USEC. This manual updates the material contained in earlier issues. It covers the essential aspects of UF{sub 6} handling, cylinder filling and emptying, general principles of weighing and sampling, shipping, and the use of protective overpacks. The physical and chemical properties of UF{sub 6} are also described. The procedures and systems described for safe handling of UF{sub 6} presented in this document have been developed and evaluated during more than 40 years of handling vast quantities of UF{sub 6}. With proper consideration for its nuclear properties, UF{sub 6} may be safely handled in essentially the same manner as any other corrosive and/or toxic chemical.

NONE

1995-01-01T23:59:59.000Z

387

Hanford Facility dangerous waste permit application, general information. Revision 1  

SciTech Connect

The current Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, number DOE/RL-91-28) and a treatment, storage, and/or disposal Unit-Specific Portion, which includes documentation for individual TSD units (e.g., document numbers DOE/RL-89-03 and DOE/RL-90-01). Both portions consist of a Part A division and a Part B division. The Part B division consists of 15 chapters that address the content of the Part B checklists prepared by the Washington State Department of Ecology (Ecology 1987) and the US Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information requirements mandated by the Hazardous and Solid Waste Amendments of 1984 and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology checklist section numbers, in brackets, follow the chapter headings and subheadings. Documentation contained in the General Information Portion (i.e., this document, number DOE/RL-91-28) is broader in nature and applies to all treatment, storage, and/or disposal units for which final status is sought. Because of its broad nature, the Part A division of the General Information Portion references the Hanford Facility Dangerous Waste Part A Permit Application (document number DOE/RL-88-21), a compilation of all Part A documentation for the Hanford Facility.

Not Available

1993-05-01T23:59:59.000Z

388

Regulatory Review of the Safety Case for Siting Licensing of Saligny Low and Intermediate Waste Repository  

SciTech Connect

The paper contains the regulatory review comments produced following submission of siting license application of Saligny repository. The regulatory review was conducted in order to verify the compliance with Romanian regulatory criteria and requirements. After assessment of completeness of safety case and availability of supporting documents the review the main technical areas started. The review process was focused on the site characteristics, waste characteristics, safety considerations as scenarios development, mathematical models, identification and treatment of uncertainties, availability of parameters. (authors)

Dogaru, D.M. [National Commission for Nuclear Activities Control, 5 Bucharest (Romania)

2008-07-01T23:59:59.000Z

389

Uranium-Loaded Water Treatment Resins: 'Equivalent Feed' at NRC and Agreement State-Licensed Uranium Recovery Facilities - 12094  

SciTech Connect

Community Water Systems (CWSs) are required to remove uranium from drinking water to meet EPA standards. Similarly, mining operations are required to remove uranium from their dewatering discharges to meet permitted surface water discharge limits. Ion exchange (IX) is the primary treatment strategy used by these operations, which loads uranium onto resin beads. Presently, uranium-loaded resin from CWSs and mining operations can be disposed as a waste product or processed by NRC- or Agreement State-licensed uranium recovery facilities if that licensed facility has applied for and received permission to process 'alternate feed'. The disposal of uranium-loaded resin is costly and the cost to amend a uranium recovery license to accept alternate feed can be a strong disincentive to commercial uranium recovery facilities. In response to this issue, the NRC issued a Regulatory Issue Summary (RIS) to clarify the agency's policy that uranium-loaded resin from CWSs and mining operations can be processed by NRC- or Agreement State-licensed uranium recovery facilities without the need for an alternate feed license amendment when these resins are essentially the same, chemically and physically, to resins that licensed uranium recovery facilities currently use (i.e., equivalent feed). NRC staff is clarifying its current alternate feed policy to declare IX resins as equivalent feed. This clarification is necessary to alleviate a regulatory and financial burden on facilities that filter uranium using IX resin, such as CWSs and mine dewatering operations. Disposing of those resins in a licensed facility could be 40 to 50 percent of the total operations and maintenance (O and M) cost for a CWS. Allowing uranium recovery facilities to treat these resins without requiring a license amendment lowers O and M costs and captures a valuable natural resource. (authors)

Camper, Larry W.; Michalak, Paul; Cohen, Stephen; Carter, Ted [Nuclear Regulatory Commission (United States)

2012-07-01T23:59:59.000Z

390

A sensing policy based on the statistical property of licensed channel in cognitive network  

Science Journals Connector (OSTI)

Many spectrum usage measurement reports have shown that the fixed-frequency allocation mechanism causes unbalanced resource occupancy. Most of the current sensing policies assume the same utilisation rate for various channels. Therefore, their performance cannot be optimised in the presence of sensing constraints. This paper proposes a modified sensing policy based on the statistical property of licensed channels. Using the negotiation rule and the statistics sensing results for the perception phase, the proposed approach can always select the licensed channels with the lowest statistical occupation number. The probability statistics approach is used to formulate the proposed sensing policies for the saturation network. Both analytical and simulation results are presented to validate the proposed model. The results show that our proposed sensing policy can maintain sensing efficiency without adding constraints and also guarantee that more available licensed channels are available. In addition, the computational cost, i.e., sensing number and time, can be reduced. We conclude that our proposed sensing policy can make full use of spectrum resources to improve network throughput.

Lian-Fen Huang; Zi-Long Gao; Dan Guo; Han-Chieh Chao; Jong Hyuk Park

2010-01-01T23:59:59.000Z

391

Licensing and {open_quotes}CRADA`s{close_quotes} in Oak Ridge technology transfer  

SciTech Connect

In the belief that effective technology transfer is a ``contact sport,`` Martin Marietta Energy Systems (Energy Systems), the Department of Energy`s (DOE`s) management contractor in Oak Ridge, Tennessee, encourages its research and engineering employees to directly interact with their commercial-sector counterparts. Over the years, relationships which have been initiated through such technical interactions have led to many of the patent licenses ad cooperative research and development agreements (CRADAs) which currently exist among Energy Systems, US companies, universities, and industrial consortia. The responsibility for creating and implementing Energy Systems policies and procedures to accomplish DOE`s technology transfer objectives in Oak Ridge lies with the Office of Technology Transfer (OTT). In addition, licensing executives within OTT are responsible for negotiating the terms and conditions of patent licenses and CRADAs for the commercialization of government-funded technologies and research expertise. Other technology transfer initiatives in Oak Ridge help companies in a wide range of industries overcome manufacturing obstacles, enabling them to retain existing jobs and to create new business opportunities.

Prosser, G.A.

1993-10-01T23:59:59.000Z

392

Notice of Intent to Revise DOE O 475.2A, Identifying Classified Information  

Directives, Delegations, and Requirements

The revision will incorporate changes that were identified during the 1-year review after initial issuance

2014-03-06T23:59:59.000Z

393

IAEA Information Circular 225 Revision 5: Fact Sheet | National Nuclear  

National Nuclear Security Administration (NNSA)

IAEA Information Circular 225 Revision 5: Fact Sheet | National Nuclear IAEA Information Circular 225 Revision 5: Fact Sheet | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Media Room > Fact Sheets > IAEA Information Circular 225 Revision 5: Fact Sheet Fact Sheet IAEA Information Circular 225 Revision 5: Fact Sheet Mar 23, 2012 The Department of Energy's National Nuclear Security Administration

394

EIS-0183: Revised Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Revised Record of Decision Revised Record of Decision EIS-0183: Revised Record of Decision Electrical Interconnection of the Summit/Westward Project The Bonneville Power Administration (BPA) has decided to amend its July 25, 2003, Record of Decision (ROD) regarding the proposed Summit/Westward Project (Project) to offer contract terms for an optional interconnection of this Project into the Federal Columbia River Transmission System (FCRTS). Under this optional interconnection plan, BPA would integrate electric power from the Project into the FCRTS at a point adjacent to Clatskanie People's Utility District (CPUD) existing Wauna Substation. DOE/EIS-0183, Bonneville Power Administration, Revised Record of Decision for the Electrical Interconnection of the Summit/Westward Project (October

395

Revision of DOE Manual 460.2-1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 TEC/WG 1 Revision of DOE M 460.2-1, Radioactive Material Transportation Practices Manual Revision of DOE M 460.2-1, Radioactive Material Transportation Practices Manual DOE Writing Team March 2006 TEC/WG 2 Proposed Revision Timeline Proposed Revision Timeline Complete new draft of Manual 2/06 Draft Manual provided to Manual Review Topic Group for review & comment 3/14/06 Comments due from Topic Group 5/01/06 Final draft Manual 7/06 Comment resolution (thru conference calls with Topic Group, as needed) 6/06 March 2006 TEC/WG 3 Proposed Timeline (contd.) Proposed Timeline (contd.) Manual is submitted into the formal Directives process 9/06 Manual reissued 12/06 March 2006 TEC/WG 4 Major Changes Made to the Manual Major Changes Made to the Manual * Clarification/update of information relative

396

Revised: 9/25/13 COMBINED MAJOR BIOLOGY/PSYCHOLOGY  

E-Print Network (OSTI)

Revised: 9/25/13 COMBINED MAJOR BIOLOGY/PSYCHOLOGY CONCENTRATION FORM (To be submitted ____________________ 5. Biology 75, 110, 115, 116, or 134 ________________________________ II. Five Psychology courses 1. Psychology 31 __________________ 2. Psychology 32 _____________________ (or Bio 132) __________________ 3

Patel, Aniruddh D.

397

Colorado Dry Natural Gas Reserves Revision Decreases (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Decreases (Billion Cubic Feet) Colorado Dry Natural Gas Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

398

Fast Flux Test Facility project plan. Revision 2  

SciTech Connect

The Fast Flux Test Facility (FFTF) Transition Project Plan, Revision 2, provides changes to the major elements and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

Hulvey, R.K.

1995-11-01T23:59:59.000Z

399

THIRD EDITION (REVISED PRINTING) SERVICE-ORIENTED COMPUTING  

E-Print Network (OSTI)

....................................................................................................10 1.3 Service-Oriented Architecture and ComputingTHIRD EDITION (REVISED PRINTING) SERVICE-ORIENTED COMPUTING AND WEB SOFTWARE INTEGRATION FROM) ............................................................................................................xv Part I Distributed Service-Oriented Software Development and Web Data Management

Chen, Yinong

400

Revised 1/17/2013 ________________________ __ Environment, Health, & Safety _____ _ __________  

E-Print Network (OSTI)

Revised 1/17/2013 ________________________ __ Environment, Health, & Safety _____ _ __________ Training Program EHS 278 ~ Ladder Safety Course Syllabus Subject Category: Occupational Safety Course and set up ladders in order to perform work at LBNL. Course Objectives: After successful completion

Eisen, Michael

Note: This page contains sample records for the topic "include revised licensing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Policy Name: Administration (Development and Revision) of University  

E-Print Network (OSTI)

Policy Name: Administration (Development and Revision) of University Policies Originating/Responsible Department: University Secretariat Approval Authority: Senior Management Committee Date of Original Policy Secretary Policy: [Note: This policy replaces the policy known as "Administration of University Policies

Carleton University

402

Texas State Offshore Crude Oil + Lease Condensate Reserves Revision...  

U.S. Energy Information Administration (EIA) Indexed Site

Decreases (Million Barrels) Texas State Offshore Crude Oil + Lease Condensate Reserves Revision Decreases (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6...

403

Texas State Offshore Crude Oil + Lease Condensate Reserves Revision...  

U.S. Energy Information Administration (EIA) Indexed Site

Increases (Million Barrels) Texas State Offshore Crude Oil + Lease Condensate Reserves Revision Increases (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6...

404

A Revision of the Leafhopper Genus Xyphon (Hemiptera: Cicadellidae)  

E-Print Network (OSTI)

in the past and their identification has been difficult using published keys. The genus is revised here based on a new species level phylogenetic assessment that incorporates both morphological and molecular data. The genus Xyphon was erected to contain...

Catanach, Therese A.

2012-02-14T23:59:59.000Z

405

Wyoming Dry Natural Gas Reserves Revision Decreases (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Decreases (Billion Cubic Feet) Wyoming Dry Natural Gas Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

406

Arkansas Dry Natural Gas Reserves Revision Increases (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Increases (Billion Cubic Feet) Arkansas Dry Natural Gas Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

407

Kansas Dry Natural Gas Reserves Revision Decreases (Billion Cubic...  

U.S. Energy Information Administration (EIA) Indexed Site

Decreases (Billion Cubic Feet) Kansas Dry Natural Gas Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

408

California Dry Natural Gas Reserves Revision Increases (Billion...  

Annual Energy Outlook 2012 (EIA)

Increases (Billion Cubic Feet) California Dry Natural Gas Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

409

Montana Dry Natural Gas Reserves Revision Increases (Billion...  

Annual Energy Outlook 2012 (EIA)

Increases (Billion Cubic Feet) Montana Dry Natural Gas Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

410

Louisiana Dry Natural Gas Reserves Revision Increases (Billion...  

Gasoline and Diesel Fuel Update (EIA)

Increases (Billion Cubic Feet) Louisiana Dry Natural Gas Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

411

Florida Dry Natural Gas Reserves Revision Decreases (Billion...  

Annual Energy Outlook 2012 (EIA)

Decreases (Billion Cubic Feet) Florida Dry Natural Gas Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

412

Michigan Dry Natural Gas Reserves Revision Increases (Billion...  

Gasoline and Diesel Fuel Update (EIA)

Increases (Billion Cubic Feet) Michigan Dry Natural Gas Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

413

Alabama Dry Natural Gas Reserves Revision Increases (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Increases (Billion Cubic Feet) Alabama Dry Natural Gas Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

414

Mississippi Dry Natural Gas Reserves Revision Decreases (Billion...  

Gasoline and Diesel Fuel Update (EIA)

Decreases (Billion Cubic Feet) Mississippi Dry Natural Gas Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

415

Mississippi Dry Natural Gas Reserves Revision Increases (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Increases (Billion Cubic Feet) Mississippi Dry Natural Gas Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

416

Virginia Dry Natural Gas Reserves Revision Increases (Billion...  

Annual Energy Outlook 2012 (EIA)

Increases (Billion Cubic Feet) Virginia Dry Natural Gas Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

417

Wyoming Dry Natural Gas Reserves Revision Increases (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Increases (Billion Cubic Feet) Wyoming Dry Natural Gas Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

418

Michigan Dry Natural Gas Reserves Revision Decreases (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Decreases (Billion Cubic Feet) Michigan Dry Natural Gas Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

419

Texas Dry Natural Gas Reserves Revision Increases (Billion Cubic...  

Annual Energy Outlook 2012 (EIA)

Increases (Billion Cubic Feet) Texas Dry Natural Gas Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

420

Ohio Dry Natural Gas Reserves Revision Decreases (Billion Cubic...  

U.S. Energy Information Administration (EIA) Indexed Site

Decreases (Billion Cubic Feet) Ohio Dry Natural Gas Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

Note: This page contains sample records for the topic "include revised licensing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Alaska Dry Natural Gas Reserves Revision Decreases (Billion Cubic...  

Annual Energy Outlook 2012 (EIA)

Decreases (Billion Cubic Feet) Alaska Dry Natural Gas Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

422

Utah Dry Natural Gas Reserves Revision Increases (Billion Cubic...  

U.S. Energy Information Administration (EIA) Indexed Site

Increases (Billion Cubic Feet) Utah Dry Natural Gas Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

423

Texas Dry Natural Gas Reserves Revision Decreases (Billion Cubic...  

Annual Energy Outlook 2012 (EIA)

Decreases (Billion Cubic Feet) Texas Dry Natural Gas Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

424

Florida Dry Natural Gas Reserves Revision Increases (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Increases (Billion Cubic Feet) Florida Dry Natural Gas Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

425

Alabama Dry Natural Gas Reserves Revision Decreases (Billion...  

Annual Energy Outlook 2012 (EIA)

Decreases (Billion Cubic Feet) Alabama Dry Natural Gas Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

426

Montana Dry Natural Gas Reserves Revision Decreases (Billion...  

Annual Energy Outlook 2012 (EIA)

Decreases (Billion Cubic Feet) Montana Dry Natural Gas Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

427

California Dry Natural Gas Reserves Revision Decreases (Billion...  

Gasoline and Diesel Fuel Update (EIA)

Decreases (Billion Cubic Feet) California Dry Natural Gas Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

428

Utah Dry Natural Gas Reserves Revision Decreases (Billion Cubic...  

Annual Energy Outlook 2012 (EIA)

Decreases (Billion Cubic Feet) Utah Dry Natural Gas Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

429

Ohio Dry Natural Gas Reserves Revision Increases (Billion Cubic...  

U.S. Energy Information Administration (EIA) Indexed Site

Increases (Billion Cubic Feet) Ohio Dry Natural Gas Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

430

Pennsylvania Dry Natural Gas Reserves Revision Increases (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Increases (Billion Cubic Feet) Pennsylvania Dry Natural Gas Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

431

Alaska Dry Natural Gas Reserves Revision Increases (Billion Cubic...  

Gasoline and Diesel Fuel Update (EIA)

Increases (Billion Cubic Feet) Alaska Dry Natural Gas Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

432

Virginia Dry Natural Gas Reserves Revision Decreases (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Decreases (Billion Cubic Feet) Virginia Dry Natural Gas Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

433

Arkansas Dry Natural Gas Reserves Revision Decreases (Billion...  

Gasoline and Diesel Fuel Update (EIA)

Decreases (Billion Cubic Feet) Arkansas Dry Natural Gas Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

434

Louisiana Dry Natural Gas Reserves Revision Decreases (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Decreases (Billion Cubic Feet) Louisiana Dry Natural Gas Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

435

Pennsylvania Dry Natural Gas Reserves Revision Decreases (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Decreases (Billion Cubic Feet) Pennsylvania Dry Natural Gas Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

436

Kansas Dry Natural Gas Reserves Revision Increases (Billion Cubic...  

Annual Energy Outlook 2012 (EIA)

Increases (Billion Cubic Feet) Kansas Dry Natural Gas Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9...

437

Revised Propane Stock Levels for 6/7/13  

Gasoline and Diesel Fuel Update (EIA)

Revised Propane Stock Levels for 6713 Release Date: June 19, 2013 Following the release of the Weekly Petroleum Status Report (WPSR) for the week ended June 7, 2013, EIA...

438

Revised 4/10/2002 _____________________________ Environment, Health, & Safety _________ __________________  

E-Print Network (OSTI)

Revised 4/10/2002 _____________________________ Environment, Health, & Safety to all potentially exposed personnel). · Specific work practices, labeling, engineering controls, and personal protective equipment used for working at Biosafety levels 1 and 2. · Disinfection, spill response

Eisen, Michael

439

Miscellaneous States Shale Gas Proved Reserves Revision Decreases...  

U.S. Energy Information Administration (EIA) Indexed Site

Decreases (Billion Cubic Feet) Miscellaneous States Shale Gas Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

440

Miscellaneous States Shale Gas Proved Reserves Revision Increases...  

U.S. Energy Information Administration (EIA) Indexed Site

Increases (Billion Cubic Feet) Miscellaneous States Shale Gas Proved Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

Note: This page contains sample records for the topic "include revised licensing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Use a Vent Condenser to Recover Flash Steam Energy (Revised)  

SciTech Connect

This revised ITP tip sheet on vent condenser to recover flash steam energy provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

Not Available

2006-05-01T23:59:59.000Z

442

Wyoming Coalbed Methane Proved Reserves Revision Decreases (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Decreases (Billion Cubic Feet) Wyoming Coalbed Methane Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

443

New Mexico Coalbed Methane Proved Reserves Revision Decreases...  

U.S. Energy Information Administration (EIA) Indexed Site

Decreases (Billion Cubic Feet) New Mexico Coalbed Methane Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

444

U.S. Coalbed Methane Proved Reserves Revision Decreases (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Decreases (Billion Cubic Feet) U.S. Coalbed Methane Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

445

Montana Coalbed Methane Proved Reserves Revision Decreases (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Decreases (Billion Cubic Feet) Montana Coalbed Methane Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

446

U.S. Coalbed Methane Proved Reserves Revision Increases (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Increases (Billion Cubic Feet) U.S. Coalbed Methane Proved Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

447

Utah Coalbed Methane Proved Reserves Revision Increases (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Increases (Billion Cubic Feet) Utah Coalbed Methane Proved Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

448

New Mexico Coalbed Methane Proved Reserves Revision Increases...  

U.S. Energy Information Administration (EIA) Indexed Site

Increases (Billion Cubic Feet) New Mexico Coalbed Methane Proved Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

449

Kansas Coalbed Methane Proved Reserves Revision Increases (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Increases (Billion Cubic Feet) Kansas Coalbed Methane Proved Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

450

West Virginia Coalbed Methane Proved Reserves Revision Increases...  

U.S. Energy Information Administration (EIA) Indexed Site

Increases (Billion Cubic Feet) West Virginia Coalbed Methane Proved Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

451

Montana Coalbed Methane Proved Reserves Revision Increases (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Increases (Billion Cubic Feet) Montana Coalbed Methane Proved Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

452

Wyoming Coalbed Methane Proved Reserves Revision Increases (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Increases (Billion Cubic Feet) Wyoming Coalbed Methane Proved Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

453

Kansas Coalbed Methane Proved Reserves Revision Decreases (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Decreases (Billion Cubic Feet) Kansas Coalbed Methane Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

454

Utah Coalbed Methane Proved Reserves Revision Decreases (Billion...  

U.S. Energy Information Administration (EIA) Indexed Site

Decreases (Billion Cubic Feet) Utah Coalbed Methane Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

455

West Virginia Coalbed Methane Proved Reserves Revision Decreases...  

U.S. Energy Information Administration (EIA) Indexed Site

Decreases (Billion Cubic Feet) West Virginia Coalbed Methane Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

456

Revised Draft Hanford Site Solid (Radioactive and Hazardous)...  

Office of Environmental Management (EM)

8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 U.S. Department of Energy, Richland Operations Office TITLE: Revised Draft Hanford Site Solid (Radioactive...

457

Revised 11/10/11 Recognized Student Organization (RSO)  

E-Print Network (OSTI)

Revised 11/10/11 Recognized Student Organization (RSO) General/Series Mtg. Direct Reservation Request All reservation requests are subject to approval. Requests will be processed between 8 am and 5 pm

Farritor, Shane

458

Questions and answers based on revised 10 CFR Part 20  

SciTech Connect

NUREG/CR-6204 is a collection of questions and answers that were originally issued in seven sets and which pertain to revised 10 CFR Part 20. The questions came from both outside and within the NRC. The answers were compiled and provided by NRC staff within the offices of Nuclear Reactor Regulation, Nuclear Material Safety and Safeguards, Nuclear Regulatory Research, the Office of State Programs, and the five regional offices. Although all of the questions and answers have been reviewed by attorneys in the NRC Office of the General Counsel, they do not constitute official legal interpretations relevant to revised 10 CFR Part 20. The questions and answers do, however, reflect NRC staff decisions and technical options on aspects of the revised 10 CFR Part 20 regulatory requirements. This NUREG is being made available to encourage communication among the public, industry, and NRC staff concerning the major revisions of the NRC`s standards for protection against radiation.

Borges, T.; Stafford, R.S.; Lu, P.Y. [Oak Ridge National Lab., TN (United States); Carter, D. [Nuclear Regulatory Commission, Washington, DC (United States)

1994-05-01T23:59:59.000Z

459

Revised 3/30/09 High Energy Physics  

E-Print Network (OSTI)

Revised 3/30/09 1 High Energy Physics INTERNAL CONTROLS Procedures for FY 2009 Organizational Chart updated on 3/27/2009 2. Only appropriate individuals with the proper degree of job responsibility

Kemner, Ken

460

EIS-0183: Revised Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Revised Record of Decision Revised Record of Decision EIS-0183: Revised Record of Decision Offer of Conditional Commitment for a Loan Guarantee for, and Electrical Interconnection of, the Shepherds Flat Wind Project; Bonneville Power Administration The U.S. Department of Energy announces its decisions to provide a conditional loan guarantee for, and interconnection to the Federal Columbia River Transmission River (FCRTS) of, the 846-megawatt (MW) Shepherds. DOE/EIS-0183, Revised Record of Decision for Offer of Conditional Commitment for a Loan Guarantee for, and Electrical Interconnection of, the Shepherds Flat Wind Project; Bonneville Power Administration, (October 2010) More Documents & Publications EIS-0183: DOE Notice of Availability of the Record of Decision EIS-0183: DOE Notice of Availability of the Record of Decision

Note: This page contains sample records for the topic "include revised licensing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Revised 30/04/2014 Lecture 12 -Memory  

E-Print Network (OSTI)

1 Revised 30/04/2014 Lecture 12 - Memory The Physiology of the Senses www.tutis.ca/Senses/ Contents ............................................................................................................ 2 Types of Memory............................................................................................................ 2 Mechanisms of Learning Procedural Memories

Vilis, Tutis

462

Final report of the NRC-Agreement State Working Group to evaluate control and accountability of licensed devices  

SciTech Connect

US NRC staff acknowledged that licensees were having problems maintaining control over and accountability for devices containing radioactive material. In June 1995, NRC approved the staff`s suggestion to form a joint NRC-Agreement State Working Group to evaluate the problem and propose solutions. The staff indicated that the Working Group was necessary to address the concerns from a national perspective, allow for a broad level of Agreement State input, and to reflect their experience. Agreement State participation in the process was essential since some Agreement States have implemented effective programs for oversight of device users. This report includes the 5 recommendations proposed by the Working Group to increase regulatory oversight, increase control and accountability of devices, ensure proper disposal, and ensure disposal of orphaned devices. Specifically, the Working Group recommends that: (1) NRC and Agreement States increase regulatory oversight for users of certain devices; (2) NRC and Agreement State impose penalties on persons losing devices; (3) NRC and Agreement States ensure proper disposal of orphaned devices; (4) NRC encourage States to implement similar oversight programs for users of Naturally-Occurring or Accelerator- Produced Material; and (5) NRC encourage non-licensed stakeholders to take appropriate actions, such as instituting programs for material identification.

NONE

1996-10-01T23:59:59.000Z

463

Impact of the Revised 10 CFR 835 on the Neutron Dose Rates at LLNL  

SciTech Connect

In June 2007, 10 CFR 835 [1] was revised to include new radiation weighting factors for neutrons, updated dosimetric models, and dose terms consistent with the newer ICRP recommendations. A significant aspect of the revised 10 CFR 835 is the adoption of the recommendations outlined in ICRP-60 [2]. The recommended new quantities demand a review of much of the basic data used in protection against exposure to sources of ionizing radiation. The International Commission on Radiation Units and Measurements has defined a number of quantities for use in personnel and area monitoring [3,4,5] including the ambient dose equivalent H*(d) to be used for area monitoring and instrument calibrations. These quantities are used in ICRP-60 and ICRP-74. This report deals only with the changes in the ambient dose equivalent and ambient dose rate equivalent for neutrons as a result of the implementation of the revised 10 CFR 835. In the report, the terms neutron dose and neutron dose rate will be used for convenience for ambient neutron dose and ambient neutron dose rate unless otherwise stated. This report provides a qualitative and quantitative estimate of how much the neutron dose rates at LLNL will change with the implementation of the revised 10 CFR 835. Neutron spectra and dose rates from selected locations at the LLNL were measured with a high resolution spectroscopic neutron dose rate system (ROSPEC) as well as with a standard neutron rem meter (a.k.a., a remball). The spectra obtained at these locations compare well with the spectra from the Radiation Calibration Laboratory's (RCL) bare californium source that is currently used to calibrate neutron dose rate instruments. The measurements obtained from the high resolution neutron spectrometer and dose meter ROSPEC and the NRD dose meter compare within the range of {+-}25%. When the new radiation weighting factors are adopted with the implementation of the revised 10 CFR 835, the measured dose rates will increase by up to 22%. The health physicists should consider this increase for any areas that have dose rates near a posting limit, such as near the 100 mrem/hr for a high radiation area, as this increase in measured dose rate may result in some changes to postings and consequent radiological controls.

Radev, R

2009-01-13T23:59:59.000Z

464

Greenhouse Gas Program Overview (Revised) (Fact Sheet)  

SciTech Connect

Overview of the Federal Energy Management Program (FEMP) Greenhouse Gas program, including Federal requirements, FEMP services, and contacts.

Not Available

2010-06-01T23:59:59.000Z

465

Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 Pilgrim Nuclear Power Station (PNPS) License Renewal Application  

E-Print Network (OSTI)

information that supplemented the LRA as a result of operating experience (OE) and industry activities potentially relevant to aging management in several specific areas. This letter provides further clarification of that supplemental information to the LRA specific to the following areas which Entergy agreed to evaluate based upon communications with the NRC technical staff. 1. Aging management of neutron-absorbing materialsEntergy Nuclear Operations, Inc. Letter Number: 2.11.017 Pilgrim Nuclear Power Station Page 2 2. Inspection of buried pipe and tanks 3. Aging management of low voltage cables 4. Inspection of containment coatings 5. Metal fatigue NUREG/CR-6260 A new regulatory commitment is provided in the PNPS License Renewal Commitment List as

Stephen J. Bethay

2011-01-01T23:59:59.000Z

466

Safety assessment of discharge chute isolation barrier preparation and installation activities. Revision 3  

SciTech Connect

This revision adds a section addressing impacts of dropping surfacing tool and rack cutter on the basin floor, and corrects typographical errors. The safety assessment is made for the activities for the preparation and installation of the discharge chute isolation barriers. The safety assessment includes a hazard assessment and comparisons of potential accidents/events to those addressed by the current safety basis documentation. No significant hazards were identified. An evaluation against the USQ evaluation questions was made and the determination made that the activities do not represent a USQ. Hazard categorization techniques were used to provide a basis for readiness review classifications.

Meichle, R.H.

1994-11-08T23:59:59.000Z

467

Feasibility study of tank leakage mitigation using subsurface barriers. Revision 1  

SciTech Connect

This document reflects the evaluations and analyses performed in response to Tri-Party Agreement Milestone M-45-07A - {open_quotes}Complete Evaluation of Subsurface Barrier Feasibility{close_quotes} (September 1994). In addition, this feasibility study was revised reflecting ongoing work supporting a pending decision by the DOE Richland Operations Office, the Washington State Department of Ecology, and the US Environmental Protection Agency regarding further development of subsurface barrier options for SSTs and whether to proceed with demonstration plans at the Hanford Site (Tri-Party Agreement Milestone M-45-07B). Analyses of 14 integrated SST tank farm remediation alternatives were conducted in response to the three stated objectives of Tri-Party Agreement Milestone M-45-07A. The alternatives include eight with subsurface barriers and six without. Technologies used in the alternatives include three types of tank waste retrieval, seven types of subsurface barriers, a method of stabilizing the void space of emptied tanks, two types of in situ soil flushing, one type of surface barrier, and a clean-closure method. A no-action alternative and a surface-barrier-only alternative were included as nonviable alternatives for comparison. All other alternatives were designed to result in closure of SST tank farms as landfills or in clean-closure. Revision 1 incorporates additional analyses of worker safety, large leak scenarios, and sensitivity to the leach rates of risk controlling constituents. The additional analyses were conducted to support TPA Milestone M-45-07B.

Treat, R.L.; Peters, B.B.; Cameron, R.J. [Enserch Environmental, Inc., Richland, WA (United States)] [and others

1995-01-01T23:59:59.000Z

468

Microsoft Word - PLN-2970 Revision 1.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

for the burning of fossil fuels in industrial processes. The areas of interest to the private sector include co-generation supply of electricity, steam and high temperature...

469

Checklist for Categorical Exclusion Determination, revised Nov...  

NLE Websites -- All DOE Office Websites (Extended Search)

at any location, a qualified biologist will survey the project alignment, including transmission line access road and associated work sites (e.g., equipment staging areas) for...

470

A licensing plan for coupling a nuclear energy source to a chemical process plant : SASOL Secunda as a case study / Randall Ruben Lavelot.  

E-Print Network (OSTI)

??The purpose of the research study was to identify the implications of the licensing processrelated costs for coupling high temperature reactor(s) (HTR) to the SASOL (more)

Lavelot, Randall Ruben

2014-01-01T23:59:59.000Z

471

Did Apples refusal to license proprietary information enabling interoperability with its iPod music player constitute an abuse under Article 82 of the EC Treaty?  

E-Print Network (OSTI)

Did Apples refusal to license proprietary informationtechnology that allowed Apple, as the creator of amises en uvre par la socit Apple Computer, Inc. dans les

Mazziotti, Giuseppe

2005-01-01T23:59:59.000Z

472

Licensed operating reactors: Status summary report, data as of December 31, 1995. Volume 20  

SciTech Connect

The US Nuclear Regulatory Commission`s monthly summary of licensed nuclear power reactor data is based primarily on the operating data report submitted by licensees for each unit. This report is divided into two sections: the first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 availability factors, capacity factors, and forced outage rates are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensees and notes to the use of weighted averages and starting dates other than commercial operation are provided.

NONE

1996-06-01T23:59:59.000Z

473

Negotiable Licensing  

NLE Websites -- All DOE Office Websites (Extended Search)

Durable Fuel Cell Membrane Electrode Assembly (MEA) Microseismic Tracer Particles for Hydraulic Fracturing A Photo-Stimulated Low Electron Temperature High Current Diamond Film...

474

Memorandum: Revised Guidance for the Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Revised Guidance for the Office of Environmental Revised Guidance for the Office of Environmental Management Site Specific Advisory Boards Memorandum: Revised Guidance for the Office of Environmental Management Site Specific Advisory Boards From: Assistant Secretary, Jessie H. Roberson (EM-1) To: SSAB Members (J. Bierer, T. Martin, M. Wilson, P. Claire, J. Brannon, D. Mosby, B. Tanner, V. Holm, W. Waters) The purpose of this memorandum is to provide guidance and direction for restructuring and managing the Environmental Management (EM) Site Specific Advisory Boards procurement mechanisms that support activities of the Boards. Roberson Memorandum - July 7, 2003 More Documents & Publications Letter: Implementation of the Guidance for the Environmental Management Site Specific Advisory Boards Letter from EM-1, Assistant Secretary, Jessie H. Roberson regarding

475

Rebuilding After Disaster: Going Green from the Ground Up (Revised)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rebuilding After Disaster: Going Green from the Ground Up (Revised) Rebuilding After Disaster: Going Green from the Ground Up (Revised) (Brochure), U.S. Department of Energy (DOE), Energy Efficiency & Renewable Energy (EERE) Rebuilding After Disaster: Going Green from the Ground Up (Revised) (Brochure), U.S. Department of Energy (DOE), Energy Efficiency & Renewable Energy (EERE) 20-page "how-to" guide describing ways to turn a disaster into an opportunity to rebuild with greener energy technologies. It covers such topics as the importance of energy, options for communities, instructions for developing an energy plan, and other considerations. This guide is intended for the community leaders who have experienced a disaster. 45136.pdf More Documents & Publications Greensburg Webinars Q&A From Tragedy to Triumph - Rebuilding Green Buildings after Disaster, EERE

476

Rebuilding After Disaster: Going Green from the Ground Up (Revised)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

After Disaster: Going Green from the Ground Up (Revised) After Disaster: Going Green from the Ground Up (Revised) (Brochure), U.S. Department of Energy (DOE), Energy Efficiency & Renewable Energy (EERE) Rebuilding After Disaster: Going Green from the Ground Up (Revised) (Brochure), U.S. Department of Energy (DOE), Energy Efficiency & Renewable Energy (EERE) 20-page "how-to" guide describing ways to turn a disaster into an opportunity to rebuild with greener energy technologies. It covers such topics as the importance of energy, options for communities, instructions for developing an energy plan, and other considerations. This guide is intended for the community leaders who have experienced a disaster. 45136.pdf More Documents & Publications From Tragedy to Triumph - Rebuilding Green Buildings after Disaster, EERE

477

ISM Plan - Chemical Sciences Division - Revised May 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

ISM Plan - Chemical Sciences Division - Revised May 2012 ISM Plan - Chemical Sciences Division - Revised May 2012 Page 2 of 25 Page intentionally left blank ISM Plan - Chemical Sciences Division - Revised May 2012 Page 3 of 25 Chemical Sciences Division ISM Plan May 2012 Page 1.0 Policy Statement 5 2.0 Description of Division/Organization, Mission and Scope of Work 5 3.0 Accountability 7 3.01 Line Management Responsibility and Accountability 8 3.02 Specific Principal Investigator Responsibilities 8 3.03 Work Lead EH&S Responsibilities 8 3.04 CSD personnel EH&S Responsibilities (Non-Supervisor or Work Lead) 9 3.05 Students 10 3.06 Work Off-Site 10 3.07 Telecommuting 11

478

Revision to DOE Order 435.1 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Management » Compliance » Revision to DOE Program Management » Compliance » Revision to DOE Order 435.1 Revision to DOE Order 435.1 The Office of Environmental Management has primary responsibility, within DOE, for DOE Order 435.1, the self-regulation of radioactive waste management. As part of this responsibility, EM has decided to update the Order to incorporate several changes to the regulatory process that have taken place over the last decade as well as streamline the Order to improve management of the waste. A comprehensive complex-wide review of DOE radioactive waste management activities associated with implementation of the requirements of DOE Order 435.1, Radioactive Waste Management, was conducted in 2010 in order to gather feedback on the effectiveness of the DOE Order 435.1 requirements (not to assess compliance with the

479

Test Procedure Development and Revision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Test Procedure Development and Revision Test Procedure Development and Revision Test Procedure Development and Revision Most energy conservation standards rulemakings are accompanied by a concurrent test procedure rulemaking. Test procedures detail the protocols that manufacturers must follow when testing their products for compliance with Department of Energy (DOE) standards. DOE also uses the test procedures to determine compliance with the applicable standards in any verification or enforcement testing. The procedures specify how to measure and calculate the energy efficiency and/or energy use of each appliance. Test procedures also specify how to calculate an estimate of an appliance's annual operating cost, which is used on the EnergyGuide label as required by the Federal Trade Commission.

480

Solid waste integrated forecast technical (SWIFT) report: FY1997 to FY 2070, Revision 1  

SciTech Connect

This web site provides an up-to-date report on the radioactive solid waste expected to be managed by Hanford's Waste Management (WM) Project from onsite and offsite generators. It includes: an overview of Hanford-wide solid waste to be managed by the WM Project; program-level and waste class-specific estimates; background information on waste sources; and comparisons with previous forecasts and with other national data sources. This web site does not include: liquid waste (current or future generation); waste to be managed by the Environmental Restoration (EM-40) contractor (i.e., waste that will be disposed of at the Environmental Restoration Disposal Facility (ERDF)); or waste that has been received by the WM Project to date (i.e., inventory waste). The focus of this web site is on low-level mixed waste (LLMW), and transuranic waste (both non-mixed and mixed) (TRU(M)). Some details on low-level waste and hazardous waste are also provided. Currently, this web site is reporting data th at was requested on 10/14/96 and submitted on 10/25/96. The data represent a life cycle forecast covering all reported activities from FY97 through the end of each program's life cycle. Therefore, these data represent revisions from the previous FY97.0 Data Version, due primarily to revised estimates from PNNL. There is some useful information about the structure of this report in the SWIFT Report Web Site Overview.

Valero, O.J.; Templeton, K.J.; Morgan, J.

1997-01-07T23:59:59.000Z

Note: This page contains sample records for the topic "include revised licensing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Analysis of strategic alliance management lessons from the failure of Korean and Japanese licensed games in China  

Science Journals Connector (OSTI)

The Chinese online game industry is a young knowledge-intensive service industry with huge potential. Since 2003, setting up strategic alliances with the Chinese online game operators has been chosen as the main mode by foreign game companies to enter China. With the rise of the Chinese online industry, the market shares of the foreign licensed games have been declining from their original dominant position. In this paper, instead of concerning the relationship between natural cultural difference and the foreign licensed game operation, the authors use Tung's technical competence theory to explore factors that have caused decline in the market share of foreign licensed games in China. In the findings, the lack of in-depth knowledge of market demand, the lack of appropriate product supply, the lack of effective business strategy and management teams as well as the Chinese government's local protection policies are classified as the main reasons for foreign games' market decline in China.

Qun Ren; Philip Hardwick

2009-01-01T23:59:59.000Z

482

Lessons learnt from ITER safety & licensing for DEMO and future nuclear fusion facilities  

E-Print Network (OSTI)

One of the strong motivations for pursuing the development of fusion energy is its potentially low environmental impact and very good safety performance. But this safety and environmental potential can only be fully realized by careful design choices. For DEMO and other fusion facilities that will require nuclear licensing, S&E objectives and criteria should be set at an early stage and taken into account when choosing basic design options and throughout the design process. Studies in recent decades of the safety of fusion power plant concepts give a useful basis on which to build the S&E approach and to assess the impact of design choices. The experience of licensing ITER is of particular value, even though there are some important differences between ITER and DEMO. The ITER project has developed a safety case, produced a preliminary safety report and had it examined by the French nuclear safety authorities, leading to the licence to construct the facility. The key technical issues that arose during ...

Taylor, Neill

2013-01-01T23:59:59.000Z

483

Unique Regulatory Approach for Licensing the Port Hope Remediation Project in Canada - 13315  

SciTech Connect

The Port Hope remediation project is a part of a larger initiative of the Canadian Federal Government the Port Hope Area Initiative (PHAI) which is based upon a community proposal. The Government of Canada, through Natural Resources Canada (NRCan) is investing $1.28 billion over 10 years to clean up historic low-level radioactive waste in the Port Hope Area and to provide long-term safe management of the low-level radioactive wastes in the Port Hope Area. These wastes arose from the activities of a former Federal Crown Corporation (Eldorado Nuclear) and its private sector predecessors. In Canada, historic waste are defined as low-level radioactive waste that was managed in a manner no longer considered acceptable, but for which the original producer cannot reasonably be held responsible or no longer exists and for which the Federal Government has accepted responsibility. In Canada, under the current regulatory framework, the environmental remediation is not considered as a distinct phase of the nuclear cycle. The regulatory approach for dealing with existing sites contaminated with radioactive residues is defined on the basis of risk and application of existing regulations. A unique regulatory approach was taken by the Canadian Nuclear Safety Commission (CNSC) to address the various licensing issues and to set out the requirements for licensing of the Port Hope Project within the current regulatory framework. (authors)

Kostova, M.; Howard, D.; Elder, P. [Directorate of Nuclear Cycle and Facilities Regulation, Canadian Nuclear Safety Commission, 280, Slater Street, Ottawa, Ontario K1P 5S9 (Canada)] [Directorate of Nuclear Cycle and Facilities Regulation, Canadian Nuclear Safety Commission, 280, Slater Street, Ottawa, Ontario K1P 5S9 (Canada)

2013-07-01T23:59:59.000Z

484

Environmental assessment proposed license renewal of Nuclear Metals, Inc. Concord, Massachusetts  

SciTech Connect

The US Nuclear Regulatory Commission (NRC) has prepared this Environmental Assessment (EA) to evaluate environmental issues associated with the renewal of licenses issued by NRC for facilities operated by Nuclear Metals, Inc. (NMI) in Concord, Massachusetts. By renewing the licenses, NRC proposes to allow the continuation of ongoing operations involving radioactive materials at NMI`s facilities. This EA focuses on the potential impacts related to air emissions at NMI during normal (incident-free) operations and accidental releases. Findings indicate that there are only two areas of potential concern. First, modeling results for sulfur dioxide (SO{sub 2}) emissions from the boilers during normal operations indicate that the potential exists for exceeding the short-term National Ambient Air Quality Standards (NAAQS). NMI is prepared to undertake mitigative action to prevent potential exceedances of the short-term SO{sub 2} NAAQS, and the Massachusetts Department of Environmental Protection is prepared to resolve the issue via a permit/approval change or through a Consent Order. Second, in the unlikely event of a severe fire, predicted sulfuric acid (H{sub 2}SO{sub 4}) concentrations based on conservative (upper bound) modeling exceed the Emergency Response Planning Guideline (ERPG) levels. NMI has committed to NRC to give a briefing for local emergency response officials regarding the potential for an accidental H{sub 2}SO{sub 4} release.

Miller, R.L.; Easterly, C.E.; Lombardi, C.E.; Treitler, I.E.; Winbow, R.T.; Zimmerman, G.P. [Oak Ridge National Lab., TN (United States)

1997-02-01T23:59:59.000Z

485

Revised Acquisition Guide Chapter 42.5, Contract Management Planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-24 2-24 Date: February 21, 2012 To: Procurement Directors From: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management Subject: Revised Acquisition Guide Chapter 42.5, Contract Management Planning Summary: The Department of Energy (DOE) has been on GAO's High Risk List for the past several years as a result of inadequate contract and project management. Accordingly, the improvement of contract administration is a critical issue for DOE. The Acquisition Guide chapter on Contract Management Planning has been completely revised to address this matter.

486

Original","Revised","Data  

U.S. Energy Information Administration (EIA) Indexed Site

,,"Original","Revised","Data" ,,"Original","Revised","Data" "Data Type","Product","End Use","PADD","State","Data 2003","Data 2003","Different" "Sales","No. 1 Distillate","Residential","U.S. TOTAL",,110032,110032 "Sales","No. 1 Distillate","Residential","PADD 1",,4232,4232 "Sales","No. 1 Distillate","Residential","PADD 1A",,2085,2085 "Sales","No. 1 Distillate","Residential","Connecticut","CT" "Sales","No. 1 Distillate","Residential","Maine","ME",536,536 "Sales","No. 1 Distillate","Residential","Massachusetts","MA",678,678

487

Licensing Guide and Sample License  

NLE Websites -- All DOE Office Websites (Extended Search)

TEI:HNOL06Y TRANSFER WORKIN6 6ROUP TEI:HNOL06Y TRANSFER WORKIN6 6ROUP Lic:en!iing Guide and Sample Lic:en!ie ·~ ICan.u City Plan I OFermilab ~OAK ~RIDGE Nuioul~.

488

Summary and analysis of public comments on NUREG-1317: Regulatory options for nuclear plant license renewal: Final report  

SciTech Connect

On August 29, 1988, the US Nuclear Regulatory Commission (NRC) issued an Advance Notice of Proposed Rulemaking on nuclear plant license renewal and solicited public comments on NUREG-1317, ''Regulatory Options for Nuclear Plant License Renewal.'' NUREG-1317 presents a discussion of fifteen topics involving technical, environmental, and procedural issues and poses a set of related questions. As part of its ongoing task for the NRC, The MITRE Corporation has summarized and analyzed the public comments received. Fifty-three written comments were received. Of these, 83 percent were from nuclear industry representatives; the remaining comments represented federal and state agencies, public interest groups, and a private citizen.

Ligon, D.M.; Seth, S.S.

1989-03-01T23:59:59.000Z

489

POLICY FLASH 2013-66 Revised Merit Review Guide for FInancail...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2013-66 Revised Merit Review Guide for FInancail Assistance, July 2013 POLICY FLASH 2013-66 Revised Merit Review Guide for FInancail Assistance, July 2013 Questions...

490

Policy Flash 2013-62 Acquisition Letter 09 - Revision of Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Letter 09 - Revision of Department of Energy (DOE) Order 350.1 and Special H Clause Policy Flash 2013-62 Acquisition Letter 09 - Revision of Department of Energy (DOE) Order...

491

POLICY FLASH 2014-25 Revision to the Procurement Strategy Panel...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25 Revision to the Procurement Strategy Panel (PSP) Briefing Process POLICY FLASH 2014-25 Revision to the Procurement Strategy Panel (PSP) Briefing Process POLICY FLASH 2014-25...

492

Reflecting the Revised PM 2.5 National Ambient Air Quality Standard...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reflecting the Revised PM 2.5 National Ambient Air Quality Standard in NEPA Evaluations Reflecting the Revised PM 2.5 National Ambient Air Quality Standard in NEPA Evaluations This...

493

Development of an energy-use estimation methodology for the revised Navy Manual MO-303  

SciTech Connect

The U.S. Navy commissioned Pacific Northwest Laboratory (PNL) to revise and/or update the Navy Utilities Targets Manual, NAVFAC MO-303 (U.S. Navy 1972b). The purpose of the project was to produce a current, applicable, and easy-to-use version of the manual for use by energy and facility engineers and staff at all Navy Public Works Centers (PWCs), Public Works Departments (PWDs), Engineering Field Divisions (EFDs), and other related organizations. The revision of the MO-303 manual involved developing a methodology for estimating energy consumption in buildings and ships. This methodology can account for, and equitably allocate, energy consumption within Navy installations. The analyses used to develop this methodology included developing end-use intensities (EUIs) from a vast collection of Navy base metering and billing data. A statistical analysis of the metering data, weather data, and building energy-use characteristics was used to develop appropriate EUI values for use at all Navy bases. A complete Navy base energy reconciliation process was also created for use in allocating all known energy consumption. Initial attempts to use total Navy base consumption values did not produce usable results. A parallel effort using individual building consumption data provided an estimating method that incorporated weather effects. This method produced a set of building EUI values and weather adjustments for use in estimating building energy use. A method of reconciling total site energy consumption was developed based on a {open_quotes}zero-sum{close_quotes} principle. This method provides a way to account for all energy use and apportion part or all of it to buildings and other energy uses when actual consumption is not known. The entire text of the manual was also revised to present a more easily read understood and usable document.

Richman, E.E.; Keller, J.M.; Wood, A.G.; Dittmer, A.L.

1995-01-01T23:59:59.000Z

494

Part 1. Knowledge Bank License Agreement (A Community in the Knowledge Bank can designate a Community Administrator to submit digital objects into the  

E-Print Network (OSTI)

Part 1. Knowledge Bank License Agreement (A Community in the Knowledge Bank can designate submission process, the community administrator is asked to check acceptance of the Knowledge Bank License to accept the agreement and return it to the Knowledge Bank.) By submitting this agreement, the copyright

Howat, Ian M.

495

Revised July 2013 ANNUAL LIVING EXPENSES*  

E-Print Network (OSTI)

ESTIMATED UNDERGRADUATE COST** TOTAL: (includes Fall & Spring semesters only) $38,668.00 GLOBAL PATHWAYS Insurance: $ 1,740.00 Other Expenses: $ 5,166.00 Annual Living Expenses Total: $18,508.00 NON) $19,885.00 Matriculation Fee: (one time charge only) $125.00 Tuition & Fees Total: $20,160.00 TOTAL

Tipple, Brett

496

Safe Operating Procedure (Revised 10/11)  

E-Print Network (OSTI)

the environment. In the context of the SPCC regulations, the definition of `oil' includes: 1. Gasoline. 2. Fuel) of the hazards of various types of oils that are subject to the SPCC Plan and storm water BMPs. Gasoline Gasoline temperatures. Gasoline vapors can travel to distant ignition sources and flash back. In confined and poorly

Farritor, Shane

497

SUMMARY OF REVISED TORNADO, HURRICANE AND EXTREME STRAIGHT WIND CHARACTERISTICS AT NUCLEAR FACILITY SITES  

Energy.gov (U.S. Department of Energy (DOE))

Summary of Revised Tornado, Hurricane and Extreme Straight Wind Characteristics at Nuclear Facility Sites BY: John D. Stevenson Consulting Engineer

498

PHMC Year 2000 handbook. Revision 3, Volume 1  

SciTech Connect

The executive overview is intended to provide an understanding of the primary drivers imposed on the PHMC team to achieve compliance with the Year 2000 problems, the process to achieve compliance and the major responsibilities. Revision 3 contains additions for infrastructure and equipment status reporting guidelines.

Layfield, K.A.

1998-09-02T23:59:59.000Z

499

Revised August 2, 2013 COMPUTER ENGINEERING CURRICULUM GUIDE  

E-Print Network (OSTI)

Revised August 2, 2013 COMPUTER ENGINEERING CURRICULUM GUIDE Ending Spring 2014 ACADEMIC Integrated Circuits (ECE332; coregistration with ECE535) 3 F ECE535 Analog Integrated Circuits Lab/CS561 Hardware/Software Design of Embedded Systems (ECE 251 or ECE452 or CS270 or CS470) 4 S ECE562

500

Revised August 2, 2013 COMPUTER ENGINEERING CURRICULUM GUIDE  

E-Print Network (OSTI)

Revised August 2, 2013 COMPUTER ENGINEERING CURRICULUM GUIDE Ending Spring 2014 ACADEMIC S ECE534 Analog Integrated Circuits (coregistration with ECE535) 3 F ECE535 Analog Integrated (ECE/CS460 or CS475) 4 S ECE/CS561 Hardware/Software Design of Embedded Systems (ECE 251 or 452