National Library of Energy BETA

Sample records for inches performance goal

  1. Goals:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Goals and Requirements Goals and Requirements The U.S. Department of Energy's (DOE) Sustainability Performance Office (SPO) oversees departmental compliance with goals outlined in Executive Order (E.O.) 13693, Planning for Sustainability in the Next Decade, and related statutes. Issued on March 19, 2015, E.O. 13693 revokes E.O.s 13514 and 13423, while setting reduction targets for energy use intensity, water use intensity, and greenhouse gas emissions and prescribing other sustainability goals

  2. 88-Inch Site Visit - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    88-Inch Site Visit For information regarding the 88-Inch Cyclotron Site Visit, please click here.

  3. The Adequacy of DOE Natural Phenomena Hazards Performance Goals...

    Office of Environmental Management (EM)

    Hazards Performance Goals from an Accident Analysis Perspective The Adequacy of DOE Natural Phenomena Hazards Performance Goals from an Accident Analysis Perspective The Adequacy ...

  4. Presidential Performance Contracting Challenge: Performance Toward New $4 Billion Goal

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Name or Ancillary Text eere.energy.gov Federal Energy Management Program Performance Toward New $4 Billion Goal Kurmit Rockwell U.S. Department of Energy April 15, 2016 Federal Energy Management Program femp.energy.gov 2 Data as of 04/15/16 President's Performance Contracting Challenge Status (April 15, 2016) Pipeline: Amount of project costs in procurement process and expected to award. Awarded: Amount of project costs awarded. Agency Commitments: Amount in project costs committed to. Total of

  5. The Adequacy of DOE Natural Phenomena Hazards Performance Goals...

    Office of Environmental Management (EM)

    Adequacy of DOE Natural Phenomena Hazards Performance Goals from an Accident Analysis ... concept of unmitigated consequences from accident analysis to designate Safety-Class ...

  6. Initiatives to Achieve Strategic Plan 2014-2018 Performance Goal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Initiatives to Achieve Strategic Plan 2014-2018 Performance Goal Focused on Cost Savings The Department of Energy (DOE) Strategic Plan 2014-2018 includes language designed to ...

  7. VENUS - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    VENUS VENUS Ion Source VENUS (Versatile ECR ion source for NUclear Science) is a next generation superconducting ECR ion source, designed to produce high current, high charge state ions for the 88-Inch Cyclotron at the Lawrence Berkeley National Laboratory. VENUS also serves as the prototype ion source for the RIA (Rare Isotope Accelerator) front end. The goal of the VENUS ECR ion source project as the RIA R&D injector is the production of high current medium charge state uranium beams

  8. Goals:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CUG 2009 Proceedings 1 of 8 User and Performance Impacts from Franklin Upgrades Yun (Helen) He National Energy Research Supercomputing Center Lawrence Berkeley National Laboratory Berkeley, CA 94720 ABSTRACT: The NERSC flagship computer Cray XT4 system "Franklin" has gone through three major upgrades: quad core upgrade, CLE 2.1 upgrade, and IO upgrade, during the past year. In this paper, we will discuss the various aspects of the user impacts such as user access, user environment, and

  9. Webmaster - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Webmaster To inquire about the 88-Inch Cyclotron website, please contact: Mike Johnson Phone: (510) 486-4389 Email: MBJohnson@lbl.gov

  10. 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    institutions use these beams to understand the effect of radiation on microelectronics, optics, materials, and cells. Click here to see the 88-Inch Cyclotron's...

  11. Midtemperature Solar Systems Test Facility predictions for thermal performance based on test data. Alpha Solarco Model 104 solar collector with 0. 125-inch Schott low-iron glass reflector surface

    SciTech Connect (OSTI)

    Harrison, T.D.

    1981-04-01

    Thermal performance predictions based on test data are presented for the Alpha Solarco Model 104 solar collector, with 0.125-inch Schott low-iron glass reflector surface, for three output temperatures at five cities in the United States.

  12. 88-Inch Cyclotron Contributions to Space Exploration - 88-Inch...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    88-Inch Cyclotron Contributions to Space Exploration Space missions and vehicles with electronic parts, materials, or recovered samples tested at the 88-Inch Cyclotron: Apollo 17 ...

  13. Neutrons - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Neutrons Neutron beams are available at the 88-Inch Cyclotron. Available energies range of from 8 to 30 MeV, with fluxes of up to 1E8 neutrons/cm^2/sec. For more information, please contact Mike Johnson via e-mail at MBJohnson@lbl.gov, or by phone at at (510) 486-4389.

  14. History - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    History Lawrence's original Cyclotron, for which he received a patent and the Nobel Prize. Lawrence's original cyclotron design was limited to energies where relativistic effects were not important. The third generation cyclotron included "sector-focusing" to allow higher energies to be obtained. The 88-Inch Cyclotron was based on Lawrence's design of a sector-focused cyclotron for the MTA project at Livermore. 1500 man-hours of work were necessary to assemble the trim coils which help

  15. Training - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Training *If you are coming from outside of Berkeley Lab, make sure you let the Admin Office know (88Admin@lbl.gov). There is additional paperwork that needs to be completed. Requirements: 1.) General Employee Radiation Training (GERT): All personnel at the 88-Inch Cyclotron are required to take GERT, which only takes a few minutes and can be found here. 2.) Building 88 On-The-Job Training (OJT): All personnel are required to take Building 88's access training (NSD 439) before card-key access

  16. Sustainability Goals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Goals Sustainability Goals We support and encourage energy conservation and environmental sustainability. Energy Conservation Efficient Water Use & Management High Performance...

  17. Sustainability Goals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Goals Sustainability Goals We support and encourage energy conservation and environmental sustainability. Energy Conservation Efficient Water Use & Management High Performance ...

  18. The Adequacy of DOE Natural Phenomena Hazards Performance Goals from an Accident Analysis Perspective

    Broader source: Energy.gov [DOE]

    The Adequacy of DOE Natural Phenomena Hazards Performance Goals from an Accident Analysis Perspective Jeff Kimball Defense Nuclear Facilities Safety Board Staff Department of Energy NPH Conference October 26, 2011

  19. Initiatives to Achieve Strategic Plan 2014-2018 Performance Goal Focused on

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cost Savings | Department of Energy Initiatives to Achieve Strategic Plan 2014-2018 Performance Goal Focused on Cost Savings Initiatives to Achieve Strategic Plan 2014-2018 Performance Goal Focused on Cost Savings The Department of Energy (DOE) Strategic Plan 2014-2018 includes language designed to expand the use of strategic sourcing across the Department for both federal procurement and contractor Management & Operating (M&O) procurements. This Policy Flash includes a memorandum

  20. Protons - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Protons The BASE Facility is capable of providing fluxes of up to 1E9 protons/cm2-sec (the limit of our standard, continuously reading ion chamber dosimetry), but works best in the 1E7 to 1E8 protons/cm2-sec range. Higher levels of flux are monitored using intermittent faraday cup readings. Standard proton energies include 13.5, 20, 30, 40, 50, and 55 MeV, and are performed in air in Cave 4A. Energies below 10 MeV are run in vacuum in Cave 4B. Shielding materials, laser alignment tools, and

  1. Noise and spurious pulses for Cherenkov light detection with 10-inch and 3-inch photomultipliers

    SciTech Connect (OSTI)

    Giordano, V.; Aiello, S.; Leonora, E. E-mail: Valentina.Giordano@ct.infn.it; Collaboration: KM3NeT Collaboration

    2014-11-18

    A large number of large photocathode area photomultipliers are widely used in astroparticle physics detectors to measure Cherenkov light in media like water or ice. In neutrino telescopes the key element of the detector is the optical module, which consists of one or more photodetectors inside a transparent pressure-resistant glass sphere. The glass sphere serves as mechanical protection while ensuring good light transmission. The performance of the telescope is largely dependent on the presence of noise pulses present on the anode of the photomultipliers. A study was conducted of noise pulses of Hamamatsu 10-inch and 3-inch diameter photomultipliers measuring time and charge distributions of dark pulses, pre-pulses, delayed pulses, and after-pulses. In particular, an analysis on multiple after-pulses was performed on both photomultiplier models. A digital oscilloscope was used to acquire all the pulses after the main pulse during a time window of 16?s for an off-line analysis to determine the charge and time spectra and a correlation between the arrival times and the charge of each after-pulse.

  2. Gasoline prices inch down (long version)

    U.S. Energy Information Administration (EIA) Indexed Site

    Gasoline prices inch down (long version) The U.S. average retail price for regular ... Pump prices were highest in the West Coast region at 3.96 a gallon, down 4.2 cents from a ...

  3. Heavy Ions - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    being sent up to the computer. The final processing and indication is performed with LabView software. The beam may be stopped manually, or by setting run time, fluence, or...

  4. Gamma Spec Lab - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Gamma Spec Lab The 88-Inch Cyclotron maintains a small gamma spectroscopy lab with two germanium detectors for use by 88 staff and experimenters. To schedule time on these detectors, contact our Research Coordinator, Mike Johnson, at MBJohnson@lbl.gov. Detector Specifications: Detector #1 Data Sheet (Coming Soon) Detector #2 Data Sheet Updates: 1.) Liquid nitrogen auto-fill has been added to both Detector #1 and Detector #2 dewars. Detector #2 height has been raised by 3.25 inches as part of

  5. Project W320 52-inch diameter equipment container load test: Test report

    SciTech Connect (OSTI)

    Bellomy, J.R.

    1995-02-22

    This test report summarizes testing activities and documents the results of the load tests performed on-site and off-site to structural qualify the 52-inch equipment containers designed and fabricated under Project W-320.

  6. Affordable Window Insulation with R-10/inch Rating

    SciTech Connect (OSTI)

    Jenifer Marchesi Redouane Begag; Je Kyun Lee; Danny Ou; Jong Ho Sonn; George Gould; Wendell Rhine

    2004-10-15

    During the performance of contract DE-FC26-00-NT40998, entitled ''Affordable Window Insulation with R-10/inch Value'', research was conducted at Aspen Aerogels, Inc. to develop new transparent aerogel materials suitable for window insulation applications. The project requirements were to develop a formulation or multiple formulations that have high transparency (85-90%) in the visible region, are hydrophobic (will not opacify with exposure to water vapor or liquid), and have at least 2% resiliency (interpreted as recoverable 2% strain and better than 5% strain to failure in compression). Results from an unrelated project showed that silica aerogels covalently bonded to organic polymers exhibit excellent mechanical properties. At the outset of this project, we believed that such a route is the best to improve mechanical properties. We have applied Design of Experiment (DOE) techniques to optimize formulations including both silica aerogels and organically modified silica aerogels (''Ormosils''). We used these DOE results to optimize formulations around the local/global optimization points. This report documents that we succeeded in developing a number of formulations that meet all of the stated criteria. We successfully developed formulations utilizing a two-step approach where the first step involves acid catalyzed hydrolysis and the second step involves base catalyzed condensation to make the gels. The gels were dried using supercritical CO{sub 2} and we were able to make 1 foot x 1 foot x 0.5 inch panels that met the criteria established.

  7. Development of a ten inch manipulators-based, flexible, broadband

    Office of Scientific and Technical Information (OSTI)

    two-crystal spectrometer (Journal Article) | SciTech Connect Journal Article: Development of a ten inch manipulators-based, flexible, broadband two-crystal spectrometer Citation Details In-Document Search Title: Development of a ten inch manipulators-based, flexible, broadband two-crystal spectrometer We have developed and implemented a broadband X-ray spectrometer with a variable energy range for use at the Atomic Weapons Establishment's Orion Laser. The spectrometer covers an energy

  8. PET computer programs for use with the 88-inch cyclotron

    SciTech Connect (OSTI)

    Gough, R.A.; Chlosta, L.

    1981-06-01

    This report describes in detail several offline programs written for the PET computer which provide an efficient data management system to assist with the operation of the 88-Inch Cyclotron. This function includes the capability to predict settings for all cyclotron and beam line parameters for all beams within the present operating domain of the facility. The establishment of a data base for operational records is also described from which various aspects of the operating history can be projected.

  9. Strategic Safety Goals | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Safety Goals More Documents & Publications Strategic Safety Goals Occupational Safety Performance Trends Development of the Nuclear Safety Information Dashboard - September 2012

  10. Environmental Sustainability Goals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sustainability Goals Environmental Sustainability Goals We are making sustainability a way of doing business at the Laboratory. Energy Conservation LANL continues to strive to ...

  11. Measurement of the photon electroproduction cross section at JLAB with the goal of performing a Rosenbluth separation of the DVCS contribution

    SciTech Connect (OSTI)

    Jimenez-Arguello, Alejandro Marti

    2014-07-01

    The study of the inner structure of hadrons allows us to understand the nature of the interactions between partons, quarks and gluons, described by Quantum Chromodynamics. The elastic scattering reactions, which have been studied in order to measure the nucleon form factors, are included in this frame. The inelastic scattering reactions are also included in this frame, they allow us to obtain information about the nucleon structure thanks to the development of the parton distribution functions (PDFs). While through elastic scattering we can obtain information about the charge distribution of the nucleon, and hence, about the spatial distribution of the partons, through inelastic scattering we obtain information about the momentum distributions of partons, by employing the PDFs. However, we can study the exclusive inelastic scattering reactions, such as the Deeply Virtual Compton Scattering (DVCS), wich allow us to access to the spatial and momentum distributions simultaneously. This is possible thanks to the generalized parton distributions (GPDs), which allow us to correlate both types of distributions. The process known as DVCS is the easiest way to access the GPDs. This process can be expressed as the scattering of an electron by a proton by means of a virtual photon with the result of the scattered initial particles plus a real photon. We find a process competing with DVCS known as Bethe-Heitler (BH), in which the real photon is radiated by the lepton rather than the quark. Due to the small cross section of DVCS, of the order of nb, in order to conduct these kind of experiments it is necessary to make use of facilities capable of providing high beam intensities. One of these facilities is the Thomas Jefferson National Accelerator Facility , where the experiment JLab E07-007, "Complete Separation of Virtual Photon and π⁰ Electroproduction Observables of Unpolarized Protons", took place during the months of October to December of 2010. The main goal of this experiment is the isolation of the contribution from the term coming form the DVCS from the interference term, resulting from the BH contribution. This isolation is known as "Rosenbluth Separation". The work presented in this thesis focuses on the analysis of the data stored by the electromagnetic calorimeter, employed for the detection of real photons. There is also a a theoretical introduction to the study of the nucleon structure, reviewing the concepts of form factors and parton distributions through elastic and inelastic processes. The computation of the photon leptoproduction cross section is described in detail, as well as the goals of experiment E07-007. This thesis also describes the analysis of the data stored by the electromagnetic calorimeter, with the purpose of obtaining the kinematic variables of the real photons resulting from DVCS reactions. Finally, it describes the selection of events from stored data, the applied cuts to kinematical variables and the background subtraction. Also, the process of extraction of the necessary observables for computing the photon leptoproduction cross section is described, along with the main steps followed to perform the Monte Carlo simulation used in this computation. The resulting cross sections are shown at the end of this thesis.

  12. Renewable Energy Goal

    Broader source: Energy.gov [DOE]

    In May 2010, the Oklahoma Legislature enacted the Oklahoma Energy Security Act (see H.B. 3028), establishing a renewable energy goal for electric utilities operating in the state. The goal calls...

  13. Environmental Sustainability Goals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sustainability Goals Environmental Sustainability Goals We are making sustainability a way of doing business at the Laboratory. Energy Conservation LANL continues to strive to reduce greenhouse gas emissions to meet and surpass Department of Energy goals. The Lab's goal is to reduce emissions from energy use in our facilities and driving vehicles in our fleet by 28 percent. Greening Transportation LANL supports and encourages employees to reduce their personal greenhouse gas emissions by

  14. Production of high intensity {sup 48}Ca for the 88-Inch Cyclotron and other updates

    SciTech Connect (OSTI)

    Benitez, J. Y.; Hodgkinson, A.; Lyneis, C. M. Strohmeier, M.; Thullier, T.; Todd, D.; Xie, D.; Franzen, K. Y.

    2014-02-15

    Recently the Versatile ECR for NUclear Science (VENUS) ion source was engaged in a 60-day long campaign to deliver high intensity {sup 48}Ca{sup 11+} beam to the 88-Inch Cyclotron. As the first long term use of VENUS for multi-week heavy-element research, new methods were developed to maximize oven to target efficiency. First, the tuning parameters of VENUS for injection into the cyclotron proved to be very different than those used to tune VENUS for maximum beam output of the desired charge state immediately following its bending magnet. Second, helium with no oxygen support gas was used to maximize the efficiency. The performance of VENUS and its low temperature oven used to produce the stable requested 75 e?A of {sup 48}Ca{sup 11+} beam current was impressive. The consumption of {sup 48}Ca in VENUS using the low temperature oven was checked roughly weekly, and was found to be on average 0.27 mg/h with an ionization efficiency into the 11+ charge state of 5.0%. No degradation in performance was noted over time. In addition, with the successful operation of VENUS the 88-Inch cyclotron was able to extract a record 2 p?A of {sup 48}Ca{sup 11+}, with a VENUS output beam current of 219 e?A. The paper describes the characteristics of the VENUS tune used for maximum transport efficiency into the cyclotron as well as ongoing efforts to improve the transport efficiency from VENUS into the cyclotron. In addition, we briefly present details regarding the recent successful repair of the cryostat vacuum system.

  15. Goals & Objectives - JCAP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PAZ0013.JPG Goals & Objectives Research Why Solar Fuels Goals & Objectives Thrust 1 Thrust 2 Thrust 3 Thrust 4 Publications Research Highlights Videos Innovations User Facilities Expert Team Benchmarking Database Device Simulation Tool XPS Spectral Database Research Introduction Why Solar Fuels? Goals & Objectives Thrusts Thrust 1 Thrust 2 Thrust 3 Thrust 4 Library Publications Research Highlights Videos Resources User Facilities Expert Team Benchmarking Database Device Simulation

  16. Energy Efficiency Goals

    Broader source: Energy.gov [DOE]

    In December of 2014 the Florida Public Service Commission (FPSC) approved new numerical conservation goals for five seven utilities subject to the Florida Energy Efficiency and Conservation Act ...

  17. Presidential Performance Contracting Challenge: Performance Toward...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Presidential Performance Contracting Challenge: Performance Toward New 4 Billion Goal Presidential Performance Contracting Challenge: Performance Toward New 4 Billion Goal ...

  18. Goals and Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Goals and Requirements Goals and Requirements The U.S. Department of Energy's (DOE) Sustainability Performance Office (SPO) oversees departmental compliance with goals outlined in Executive Order (E.O.) 13693, Planning for Sustainability in the Next Decade, and related statutes. Issued on March 19, 2015, E.O. 13693 revokes E.O.s 13514 and 13423, while setting reduction targets for energy use intensity, water use intensity, and greenhouse gas emissions and prescribing other sustainability goals

  19. Risk assessment of K Basin twelve-inch and four-inch drain valve failure from a postulated seismic initiating event

    SciTech Connect (OSTI)

    MORGAN, R.G.

    1999-06-23

    The Spent Nuclear Fuel (SNF) Project will transfer metallic SNF from the Hanford 105 K-East and 105 K-West Basins to safe interim storage in the Canister Storage Building in the 200 Area. The initial basis for design, fabrication, installation, and operation of the fuel removal systems was that the basin leak rate which could result from a postulated accident condition would not be excessive relative to reasonable recovery operations. However, an additional potential K Basin water leak path is through the K Basin drain valves. Three twelve-inch drain valves are located in the main basin bays along the north wall. Five four-inch drain valves are located in the north and south loadout pits (NLOP and SLOP), the weasel pit, the technical viewing pit, and the discharge chute pit. The sumps containing the valves are filled with concrete which covers the drain valve body. Visual observations indicate that only the valve's bonnet and stem are exposed above the basin concrete floor for the twelve-inch drain valve and that much less of the valve's bonnet and stem are exposed above the basin concrete floor for the five four-inch drain valves. It was recognized, however, that damage of the drain valve bonnet or stem during a seismic initiating event could provide a potential K Basin water leak path. The objectives of this analysis are to: (1) evaluate the likelihood of damaging the three twelve-inch drain valves located along the north wall of the main basin and the five four-inch drain valves located in the pits from a seismic initiating event, and (2) determine the likelihood of exceeding a specific consequence (initial leak rate) from a damaged valve. The analysis process is a risk-based uncertainty analysis where each variable is modeled using available information and engineering judgement. The uncertainty associated with each variable is represented by a probability distribution (probability density function). Uncertainty exists because of the inherent randomness associated with the distribution of values that a variable may assume, and because of a lack of knowledge concerning a variable. Engineering judgement and technical information are used to develop the variable probability density functions, but the bounds of the probability density function are based on physical limitations. The uncertainty, described by probability distributions, is propagated through the analysis by Monte Carlo convolution techniques. The corresponding results are developed as a probability distribution and expressed in terms of the corresponding complementary cumulative distribution function (''risk curve'').

  20. Socioeconomic procurement goals and achievements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Socioeconomic procurement goals and achievements Socioeconomic procurement goals and achievements LANL ensures that a percentage of procurements are placed with small and other...

  1. DEMO Project Goals | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    DEMO Project Goals The goals of this demonstration project are to Improve hiring by allowing NNSA to compete more effectively for high quality employees through the judicious use of higher entry salaries; Motivate and retain staff by providing faster pay progression for high-performing employees; Improve the usefulness and responsiveness of the position classification system to managers; Increase the proficiency of administering the position classification system through a simplified pay-banded

  2. Environment, Safety and Health (ESH) Goals

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-08-02

    The purpose of this Policy is to establish Environment, Safety and Health (ES&H) goals for Department of Energy (DOE) personnel and its contractors. These goals are designed to establish Departmental ES&H expectations for: 1) DOE and contractor personnel ES&H behaviors and attitudes in the conduct of their daily work activities, and 2) operational performance regarding worker injuries and illnesses, regulatory enforcement actions, and environmental releases. Cancels DOE P 450.1, DOE P 450.6. Canceled by DOE O 450.4A

  3. Guam- Renewable Energy Portfolio Goal

    Broader source: Energy.gov [DOE]

    Guam Bill 166 enacted in March 2008, established a renewable energy portfolio goal of 25% renewable energy by 2035.* Under this law, each utility that sells electricity for consumption on Guam mu...

  4. Assessment of RELAP/MOD3 using BETHSY 6.2TC 6-inch cold leg side break comparative test

    SciTech Connect (OSTI)

    Chung, Young-Jong; Jeong, Jae-Jun; Chang, Won-Pyo; Kim, Dong-Su

    1996-10-01

    This report presents the results of the RELAP5/MOD3 Version 7j assessment on BETHSY 6.2TC. BETHSY 6.2TC test corresponding to a six inch cold leg break LOCA of the Pressurizer Water Reactor(PWR). The primary objective of the test was to provide reference data of two facilities of different scales (BETHSY and LSTF facility). On the other hand, the present calculation aims at analysis of RELAP5/N4OD3 capability on the small break LOCA simulation, The results of calculation have shown that the RELAP5/MOD3 reasonably predicts occurrences as well as trends of the major phenomena such as primary pressure, timing of loop seal clearing, liquid hold up, etc. However, some disagreements also have been found in the predictions of loop seal clearing, collapsed core water level after loop seal clearing, and accumulator injection behaviors. For better understanding of discrepancies in same predictions, several sensitivity calculations have been performed as well. These include the changes of two-phase discharge coefficient at the break junction and some corrections of the interphase drag term. As result, change of a single parameter has not improved the overall predictions and it has been found that the interphase drag model has still large uncertainties.

  5. Widget:GoalMeter | Open Energy Information

    Open Energy Info (EERE)

    some numeric goal. Parameters Parameter Type Required? Example Description goal Integer Y 100 Total goal value httplink String Y groups.google.comgroupopenei URL to which the...

  6. Meeting pollution prevention goals: Successful implementation

    SciTech Connect (OSTI)

    Seith, B.J. )

    1993-01-01

    This paper focuses on the essential, but often overlooked, elements of a pollution prevention program: the steps required for a successful implementation. As programs are being developed, attention must be given to assuring that the systems to support a successful introduction and continued improvement are in place. The goals of a pollution prevention plan (i.e. 50% reduction in toxics use and 40% reduction in hazardous waste generation within three years) must be translated into performance oriented-responsibilities taken throughout an organization, at all levels. Successful implementation requires a genuine commitment from management, employee awareness programs tailored to each type of audience, and a feedback system to assure that the program is continually changing to incorporate new pollution prevention challenges. Also, by conducting an economic analysis of pollution prevention opportunities and activities, and incorporating the results into the business decision-making process, a company is more apt to make wise and measurable performance towards its pollution prevention goals.

  7. Testing of one-inch UF{sub 6} cylinder valves under simulated fire conditions

    SciTech Connect (OSTI)

    Elliott, P.G.

    1991-12-31

    Accurate computational models which predict the behavior of UF{sub 6} cylinders exposed to fires are required to validate existing firefighting and emergency response procedures. Since the cylinder valve is a factor in the containment provided by the UF{sub 6} cylinder, its behavior under fire conditions has been a necessary assumption in the development of such models. Consequently, test data is needed to substantiate these assumptions. Several studies cited in this document provide data related to the behavior of a 1-inch UF{sub 6} cylinder valve in fire situations. To acquire additional data, a series of tests were conducted at the Paducah Gaseous Diffusion Plant (PGDP) under a unique set of test conditions. This document describes this testing and the resulting data.

  8. Materials Technologies: Goals, Strategies, and Top Accomplishments...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Materials Technologies: Goals, Strategies, and Top Accomplishments (Brochure), Vehicle Technologies Program (VTP) Materials Technologies: Goals, Strategies, and Top Accomplishments ...

  9. Determine Institutional Change Sustainability Goals

    Office of Energy Efficiency and Renewable Energy (EERE)

    The first step in the institutional change process is defining your federal agency's sustainability goals. That is, decide what outcomes are desired (or required) over what period of time. Behavioral, organizational, and institutional changes typically are means to achieve desired energy, resource, or greenhouse gas emission outcomes. They are not ends in and of themselves.

  10. Introduction to the BTO Goals Framework

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    uses - EUI trends regularly reported and forecast by EIA * Tiered Goals: - Building Sector ... All numbers are relative to the 2015 AEO Reference Case Forecast. 11 Are BTO's Goals ...

  11. LANL exceeds Early Recovery Act recycling goals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LANL exceeds Early Recovery Act recycling goals LANL exceeds Early Recovery Act recycling goals Lab demolition projects under the American Recovery and Reinvestment Act have...

  12. Radiation characterization summary : ACRR 44-inch lead-boron bucket located in the central cavity on the 32-inch pedestal at the core centerline (ACRR-LB44-CC-32-cl).

    SciTech Connect (OSTI)

    Parma, Edward J.,; Quirk, Thomas J.; Lippert, Lance L.; Griffin, Patrick Joseph; Naranjo, Gerald E.; Luker, Spencer Michael

    2013-04-01

    This document presents the facility-recommended characterization of the neutron, prompt gamma-ray, and delayed gamma-ray radiation fields in the Annular Core Research Reactor (ACRR) for the 44-inch-long lead-boron bucket in the central cavity on the 32-inch pedestal at the core centerline. The designation for this environment is ACRR-LB44-CC-32-cl. The neutron, prompt gamma-ray, and delayed gamma-ray energy spectra are presented as well as radial and axial neutron and gamma-ray flux profiles within the experiment area of the bucket. Recommended constants are given to facilitate the conversion of various dosimetry readings into radiation metrics desired by experimenters. Representative pulse and steady-state operations are presented with conversion examples.

  13. Identifying Needs and Goals | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Identifying Needs and Goals Identifying Needs and Goals Identifying the needs and goals is the first step in planning for a federal site solar project. The reasons for considering a solar project help define the needs and goals that the project will address. Potential goals or criteria include the following: Maximize on-site solar energy production (particularly within a restricted budget). Maximize the return on investment. Meet a minimum annual solar energy production target. Maximize the

  14. City of Phoenix- Renewable Energy Goal

    Broader source: Energy.gov [DOE]

    In 2008, the Phoenix City Council approved a renewable energy goal for the city. The city aims for 15% of the electricity used by the city to come from renewable energy sources by 2025. This goal...

  15. Energy Reduction Goals | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    a portion of the compensation Vermont pays VEIC is contingent on meeting stated goals, subject to a monitoring and verification process. If VEIC does not meet stated goals, the...

  16. Goals & Objectives Chart | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Goals & Objectives Chart PDF icon goal and objectives chart.pdf Responsible Contacts Donna Friend HUMAN RESOURCES SPECIALIST E-mail donna.friend@hq.doe.dov Phone 202-586-5880 More ...

  17. TRUPACT-I Unit 0 test data analysis. [Puncture bar impacts; free fall of package 12 inches onto unyielding surface; 30-foot free fall drop onto unyielding target; 40-inch drops onto 6-inch diagmeter puncture bar; engulfment in jet fuel fire for 35 minutes

    SciTech Connect (OSTI)

    Romesberg, L.E.; Hudson, M.L.; Osborne, D.M.

    1985-09-01

    TRUPACT-I was tested to evaluate the response of the design to the normal and hypothetical accident conditions specified in applicable regulations. The governing regulations are contained in DOE Order No. 5480.1, Chapter 3 and 10 CFR, Part 71, Refs. 1 and 2. Tests were conducted at Oak Ridge National Laboratory, Oak Ridge, TN, and at Sandia National Laboratories, Albuquerque, NM. Normal condition tests included three 13-pound (1.25 in. diameter) puncture bar impacts onto the exterior surface and free fall of the package 12 inches onto an essentially unyielding surface. Hypothetical accident conditions included in the test sequence were two 30-foot free fall drops of the package onto an essentially unyielding target, four 40-inch drops onto a 6-inch-diameter puncture bar, and engulfment in a JP-4 jet fuel fire for 35 minutes. Instrumentation data traces will be published in Ref. 3 and are not reproduced herein. This report presents an analysis of the available data and an interpretation of the results. The results of the tests are compared to results from numerical analyses and scale model tests which are incorporated in the TRUPACT-I SARP, Ref. 4. 9 refs., 43 figs., 3 tabs.

  18. Materials Technologies: Goals, Strategies, and Top Accomplishments

    SciTech Connect (OSTI)

    2010-08-02

    Fact sheet describing the goals, strategies, and top accomplishments of the Materials Technologies subprogram of the Vehicle Technologies Program.

  19. Veteran Hiring Goals Memo | Department of Energy

    Energy Savers [EERE]

    Veteran Hiring Goals Memo Veteran Hiring Goals Memo PDF icon CHCO Memo_FY16 Veteran Hiring Goals Memo Final_03-07-2016.pdf Responsible Contacts Donna Friend HUMAN RESOURCES SPECIALIST E-mail donna.friend@hq.doe.dov Phone 202-586-5880 More Documents & Publications FY15 Veteran Hiring Goals Memo POLICY GUIDANCE MEMORANDUM #32A Schedule A Appointments of Persons with Disabilities and Appointments for Disabled Veterans Operational Plan and Desktop Reference for the Veterans Employment Program

  20. Hanford Site Workers Meet Challenging Performance Goal at Plutonium

    Office of Environmental Management (EM)

    Hallam Nuclear Power Facility, NE 1969 1998 2. Piqua Nuclear Power Facility, OH 1969 1998 3. Bayo Canyon, NM 1982 1998 4. Kellex/Pierpont, NJ 1982 1998 5. University of California, CA 1982 1998 6. Acid/Pueblo Canyons, NM 1984 1999 7. Chupadera Mesa, NM 1984 1999 8. Canonsburg, PA 1986 1999 9.Shiprock, NM 1987 2000 10. Middlesex Municipal Landfill, NJ 1987 2000 11. Niagara Falls Storage Site Vicinity Properties, NY 1987 2001 12. Salt Lake City, UT 1989 2001 13. Spook, WY 1989 2001 14. National

  1. Hanford Site Workers Meet Challenging Performance Goal at Plutonium...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and are housed vertically on the walls of a long and tall concrete-reinforced room, or canyon. The canyon is too contaminated to enter for long periods of time, so workers use the...

  2. A RE-LOOK AT THE US NRC SAFETY GOALS

    SciTech Connect (OSTI)

    mubayi v.

    2013-09-22

    Since they were adopted in 1986, the US NRC’s Safety Goals have played a valuable role as a de facto risk acceptance criterion against which the predicted performance of a commercial nuclear power reactor can be evaluated and assessed. The current safety goals are cast in terms of risk metrics called quantitative health objectives (QHOs), limiting numerical values of the risks of the early and latent health effects of accidental releases of radioactivity to the offsite population. However, while demonstrating compliance with current safety goals has been an important step in assessing the acceptance of the risk posed by LWRs, new or somewhat different goals may be needed that go beyond the current early fatality and latent cancer fatality QHOs in assessing reactor risk. Natural phenomena such as hurricanes seem to be suitable candidates for establishing a background rate to derive a risk goal as their order of magnitude cost of damages is similar to those estimated in severe accident Level 3 PRAs done for nuclear power plants. This paper obtains a risk goal that could have a wider applicability, compared to the current QHOs, as a technology-neutral goal applicable to future reactors and multi-unit sites.

  3. DEMO Project Goals | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    DEMO Project Goals | National Nuclear Security Administration Facebook Twitter Youtube ... and responsiveness of the position classification system to managers; Increase the ...

  4. Mission and Goals | Advanced Photon Source

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mission and Goals The mission of the Advanced Photon Source (APS) is to deliver world-class science and technology by operating an outstanding synchrotron radiation research...

  5. Federal Progress Toward Energy/Sustainability Goals

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Progress Toward Energy Sustainability Goals June 10, 2014 Chris Tremper Program Analyst, Federal Energy Management Program U.S. Department of Energy 2 Overall Federal Energy...

  6. Clean Energy Portfolio Goal | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Renewables Portfolio Standard Summary In May 2011, Indiana enacted SB 251, creating the Clean Energy Portfolio Standard (CPS). The program sets a voluntary goal of 10% clean...

  7. Fuel Technologies: Goals, Strategies, and Top Accomplishments

    SciTech Connect (OSTI)

    2009-07-16

    Brochure describing the goals, strategies, and some of the major accomplishments of the Fuel Technologies subprogram of the Vehicle Technologies Program.

  8. DEPARTMENT OF THE NAVY Energy Goals

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    door-to-door in New Orleans, September 2005 SECNAV Energy Goals Increase Alternative Energy Sources Ashore Sail the "Great Green Fleet" Reduce Non-tactical Petroleum Use ...

  9. Application of Derrick Corporation's stack sizer technology for slimes reduction in 6 inch clean coal hydrocyclone circuits

    SciTech Connect (OSTI)

    Brodzik, P.

    2009-04-15

    The article discusses the successful introduction of Derrick Corporation's Stack Sizer technology for removing minus 200 mesh slimes from 6-inch coal hydrocyclone underflow prior to froth flotation or dewatering by screen bowl centrifuges. In 2006, the James River Coal Company selected the Stack Sizer fitted with Derrick 150 micron and 100 micron urethane screen panels for removal of the minus 100 mesh high ash clay fraction from the clean coal spiral product circuits. After this application proved successful, Derrick Corporation introduced new 75 micron urethane screen panels for use on the Stack Sizer. Evaluation of feed slurry to flotation cells and screen bowl centrifuges showed significant amounts of minus 75 micron that could potentially be removed by efficient screening technology. Removal of the minus 75 micron fraction was sought to reduce ash and moisture content of the final clean coal product. Full-scale lab tests confirmed that the Stack Sizer fitted with Derrick 75 micron urethane screen panels consistently reduced the minus 75 micron percentage in coal slurry from 6-inch clean coal hydrocyclone underflow that is approximately 15 to 20% solid by-weight and 30 to 60% minus 75 micron to a clean coal fraction that is approximately 13 to 16% minus 75 micron. As a result total ash is reduced from approximately 36 to 38% in the hydrocyclone underflow to 14 to 16% in the oversize product fraction form the Stack Sizers. 1 fig., 2 tabs., 5 photos.

  10. Building Technologies Program Vision, Mission, and Goals

    SciTech Connect (OSTI)

    2011-12-15

    The Vision, Mission, and Goals of the Building Technologies Program (BTP) focus on short term energy efficiency outcomes such as improved economic environment, enhanced comfort, and affordability that collectively benefit our nation. Long-term goals focus on helping secure our nation's energy independence.

  11. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... KEY ACCOMPLISHMENTS 24-Inch Export Water Line Leak Repair - A 24-inch export ... Waste Information Data System (WIDS) sites, easements with Bonneville Power Administration, etc. ...

  12. Better Buildings Challenge, Atlanta Nears Halfway Mark in Meeting Citywide Goal of 20% Energy Savings

    Broader source: Energy.gov [DOE]

    The Energy Department yesterday recognized Atlanta for its progress and leadership in meeting a citywide goal to improve the energy performance of its buildings by 20% by 2020.

  13. Savannah River Site 1992 ALARA goals

    SciTech Connect (OSTI)

    Smith, L.S.

    1992-01-01

    The ALARA Goals for the Savannah River Site (SRS) for 1992 have been established by the operating Divisions/Departments and totaled for the anticipated scope of sitewide work. Goals for maximum individual exposure and personnel contamination cases have been reduced from 1991 actual data. The goal for assimilations of radionuclides remains at zero. The 633.20 rem cumulative exposure goal is constituted of special work operations and base routine operations, respectively 244.68 rem and 388.52 rem. The cumulative exposure goal is an increase of 50% over the 1991 data to support the start up to K Reactor, operations of FB Line and scheduled special work. The 633.20 rem is 4% less than the 1990 data. Additionally, three reduction goals have been established to demonstrate a decrease in the Site overall radiological hazard. These reduction goals are for the size of airborne activity and contamination areas and the number of contamination events occurring outside a radiologically controlled area (RCA). The ALARA program is documented in the recently revised SRS ALARA Guide (October 1991).

  14. Energy Goals and Standards for Federal Government

    Broader source: Energy.gov [DOE]

    Executive Order 13514, signed in October 2009, created a series of new requirements aimed at increasing the sustainability of all federal agencies. To help achieve these goals, the Executive Order...

  15. Post-2015 Maryland Energy Efficiency Goals

    Broader source: Energy.gov [DOE]

     In July 2015, the Public Service Commission (PSC) in its Order 87082 established energy efficiency goals for the State. Previous state mandated energy efficiency program- EmPOWER Maryland Act is...

  16. PSEG Long Island- Renewable Electricity Goal

    Broader source: Energy.gov [DOE]

    NOTE: As of January 1, 2014, Long Island is served by PSEG Long Island, replacing Long Island Power Authority (LIPA). Long Island Renewable Energy goal ended in 2013, and currently does not have...

  17. Green Power Purchasing Goal for Federal Government

    Office of Energy Efficiency and Renewable Energy (EERE)

    The federal Energy Policy Act of 2005 (EPAct 2005) extended and expanded several previous goals and standards to reduce energy use in existing and new federal buildings. Section 203 of EPAct 2005...

  18. Goals Framework — 2016 BTO Peer Review

    Broader source: Energy.gov [DOE]

    This presentation at the 2016 Peer Review provided an overview of the Building Technologies Office’s Goals Framework. Through robust feedback, the BTO Program Peer Review enhances existing efforts and improves future designs.

  19. Volume, Number of Shipments Surpass Goals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in the country."Our goal this fiscal year was to send 184 shipments to WIPP," said Lee Bishop, TRU waste manager at the U.S. Department of Energy's National - 2 - Nuclear Security...

  20. Los Alamos exceeds waste shipping goal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    exceeds waste shipping goal Los Alamos exceeds waste shipping goal Los Alamos shipped more than 3,000 cubic meters of transuranic (TRU) and mixed low-level waste to the Waste Isolation Pilot Plant and other approved waste disposal facilities. July 8, 2013 A shipment carrying Los Alamos transuranic waste headed to the Waste Isolation Pilot Plant in southeastern New Mexico. A shipment carrying Los Alamos transuranic waste headed to the Waste Isolation Pilot Plant in southeastern New Mexico.

  1. Los Alamos exceeds waste shipping goal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Los Alamos exceeds waste shipping goal Los Alamos exceeds waste shipping goal Los Alamos shipped 1,074 cubic meters of transuranic (TRU) and mixed low-level waste to the Waste Isolation Pilot Plant and other approved waste disposal facilities. July 8, 2013 A shipment carrying Los Alamos transuranic waste heads down NM 502, bound for the Waste Isolation Pilot Plant in southeastern New Mexico. A shipment carrying Los Alamos transuranic waste heads down NM 502, bound for the Waste Isolation Pilot

  2. Los Alamos exceeds waste shipping goal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Los Alamos exceeds waste shipping goal Los Alamos exceeds waste shipping goal Los Alamos shipped 1,074 cubic meters of transuranic (TRU) and mixed low-level waste to the Waste Isolation Pilot Plant and other approved waste disposal facilities. July 8, 2013 A shipment carrying Los Alamos transuranic waste heads down NM 502, bound for the Waste Isolation Pilot Plant in southeastern New Mexico. A shipment carrying Los Alamos transuranic waste heads down NM 502, bound for the Waste Isolation Pilot

  3. Presidential Performance Contracting Challenge: Performance Toward New $4

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Billion Goal | Department of Energy Presidential Performance Contracting Challenge: Performance Toward New $4 Billion Goal Presidential Performance Contracting Challenge: Performance Toward New $4 Billion Goal Presidential Performance Contracting Challenge Status graphic. May 9, 2014, the president announced an additional $2 billion goal in federal energy-efficiency upgrades to federal buildings through 2016. This goal, in combination with the initial commitment of $2 billion in 2011, will

  4. Path to development of quantitative safety goals

    SciTech Connect (OSTI)

    Joksimovic, V.; Houghton, W.J.

    1980-04-01

    There is a growing interest in defining numerical safety goals for nuclear power plants as exemplified by an ACRS recommendation. This paper proposes a lower frequency limit of approximately 10/sup -4//reactor-year for design basis events. Below this frequency, down, to a small frequency such as 10/sup -5//reactor-year, safety margin can be provided by, say, site emergency plans. Accident sequences below 10/sup -5/ should not impact public safety, but it is prudent that safety research programs examine sequences with significant consequences. Once tentatively agreed upon, quantitative safety goals together with associated implementation tools would be factored into regulatory and design processes.

  5. Vehicle Technologies Program: Goals, Strategies, and Top Accomplishmen...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program: Goals, Strategies, and Top Accomplishments (Brochure), Vehicle Technologies Program (VTP) Vehicle Technologies Program: Goals, Strategies, and Top Accomplishments ...

  6. Step 1: Determine Goals for Institutional Change

    Office of Energy Efficiency and Renewable Energy (EERE)

    The first step in the institutional change process is defining your federal agency's sustainability goals. That is, decide what outcomes are desired (or required) over what period of time. Behavioral, organizational, and institutional changes typically are means to achieve desired energy, resource, or greenhouse gas emission outcomes. They are not ends in and of themselves.

  7. Refurbishment and modification of existing protective shipping packages (for 30-inch UF{sub 6} cylinders) per USDOT specification No. USA-DOT-21PF-1A

    SciTech Connect (OSTI)

    Housholder, W.R.

    1991-12-31

    This paper addresses the refurbishment procedures for existing shipping containers for 30-inch diameter UF{sub 6} cylinders in accordance with DOT Specification 21PF-1 and the criteria used to determine rejection when such packages are unsuitable for refurbishment.

  8. Procedures - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procedures You must be logged in with your Berkeley Lab LDAP to view these documents PUB-3000 Cyclotron Procedures Mechanical Procedures Electrical Procedures Ion Source Procedures Accelerator Safety (SAD & ASE) Radiological Work Authorizations Memorandums Forms Abbreviations & Acronyms

  9. Safety - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Safety The Nuclear Sciences Division (NSD) is committed to providing a safe workplace for its employees, contractors, and guests and conducting its research and operations in a manner that protects the environment. In conducting its operations and research, NSD meets or exceeds Berkeley Lab, University of California, and U.S. Department of Energy policies and requirements. To report a life-threatening accident, call x7911 For all other accidents or near-hits, call x6999 For Emergency Status

  10. Schedule - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Schedule Cyclotron Schedule

  11. Shipping - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    To ship equipment to the BASE Facility, send it to the following address: To: Mike Johnson (3rd Party No PO) Lawrence Berkeley National Laboratory 1 Cyclotron Rd, Bldg 88...

  12. Directions - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Directions The Laboratory is on the hillside directly above the campus of the University of California at Berkeley. Our address is 1 Cyclotron Rd. Bldg. 88, Berkeley, CA 94720. To...

  13. Directory - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Directory Control Room On-shift Operator 510-486-5088 Admin Office Kymba A'Hearn 510-495-8888 88Admin@lbl.gov Dorothy Kenlow 510-486-7535 88Admin@lbl.gov ***...

  14. AECR - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of the aluminum plasma chamber is 0.85 Tesla. The aluminum plasma chamber is 30 cm in length, with an inner diameter of 7.6 cm. Six radial slots and an external turbo pump give...

  15. ECR - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    copper contamination of beams. The chamber is approximately 2 liters in volume; 33 cm in length by 9 cm inner diameter. The pumping is accomplished through 6 radial slots in the...

  16. Links - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Links Berkeley Lab Links: Nuclear Science Division Berkeley Lab Berkeley Lab Guest House Berkeley Lab Cafeteria Jobs at Berkeley Lab Today at Berkeley Lab Health and Safety Manual...

  17. Status of Laboratory Goals | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status of Laboratory Goals Status of Calendar Year 2016 objectives and targets. Item 1 Recommendation: The EMSSC recommends an Open House be held in the Ames Laboratory Storeroom and Warehouse by April 1, 2016. The Open House will provide Ames Laboratory employees the opportunity to discover what supplies are readily available through the storeroom and showcase the Equipment Pool website. This recommendation will increase awareness of the sustainable purchasing requirements by showcasing these

  18. Post-reform continuation of social goals

    SciTech Connect (OSTI)

    Graniere, R.J.

    1996-01-01

    Public utility regulators are currently wrestling with the issue of how and to what extent the social goals that have grown up around traditional regulation might be continued in a restructured electric power industry. This report critically examines six mechanisms that could be used for this purpose in the wake of the introduction of competition in the generation segment. Their pros and cons are thoroughly appraised in economic terms.

  19. Volume, Number of Shipments Surpass Goals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    shatters records in first year of accelerated shipping effort October 3, 2012 Los Alamos National Laboratory shatters records in first year of accelerated shipping effort Volume, Number of Shipments Surpass Goals LOS ALAMOS, NEW MEXICO, October 3, 2012-In the first year of an effort to accelerate shipments of transuranic (TRU) waste to the Waste Isolation Pilot Plant (WIPP), Los Alamos National Laboratory shattered its own record with 59 more shipments than planned, and became one of the largest

  20. Fermilab | Take Five for Goal Zero

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Take Five for Goal Zero Take Five Tools Forms Take 5 Challenge Archive Challenge #1 Challenge #2 Challenge #3 Challenge #4 Challenge #5 Challenge #6 Challenge #7 Challenge #8 Questions & Answers Submit a Question FESHM FRCM ESH&Q Org Chart Follow Fermilab On... Facebook Twitter YouTube Quantum Diaries More ways to follow us U.S. Department of Energy Home Page HEP Program News & Information Interactions.org Particle Physics News Image Bank Fermilab in the News Quantum Diaries photo:

  1. Presidential Performance Contracting Challenge: Performance Toward...

    Broader source: Energy.gov (indexed) [DOE]

    Presidential Performance Contracting Challenge Status graphic. May 9, 2014, the president announced an additional 2 billion goal in federal energy-efficiency upgrades to federal...

  2. Telework Participation Goal (FY 2014) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Telework Participation Goal (FY 2014) Telework Participation Goal (FY 2014) This document is a memorandum from the Department's Telework Managing Officer, who is the Chief Human Capital Officer, which establishes the Department's participation goal. DOE's participation goal is now based on the total number of employees eligible to telework, rather than the total number of employees on board, as of the end of the previous FY. The FY 14 goal is 38%. PDF icon CHCO Memo - FY 14 Participation Goal

  3. Vehicle Technologies Office: 21st Century Truck Technical Goals |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 1st Century Truck Technical Goals Vehicle Technologies Office: 21st Century Truck Technical Goals Vehicle Technologies Office: 21st Century Truck Technical Goals Vehicle Technologies Office: 21st Century Truck Technical Goals Vehicle Technologies Office: 21st Century Truck Technical Goals Vehicle Technologies Office: 21st Century Truck Technical Goals Improving fuel efficiency in heavy trucks depends on a number of factors associated with the truck and its components.

  4. Greenidge multi-pollutant project achieves emissions reduction goals

    SciTech Connect (OSTI)

    2008-07-01

    Performance testing at the Greenridge Multi-Pollutant Project has met or exceeded project goals, indicating that deep emission reduciton sin small, difficult-to-retrofit power plants can be achieved. The technology fitted at the 107 MWe AES Greenridge Unit 4 includes a hybrid selective non-catalytic reduction/selective catalytic reduction system for NOx control (NOxOUT CASCADE) and a Turbosorp circulating fluidized bed dry scrubber system for SO{sub 2}, mercury, SO{sub 3} HC and Hf control. 2 figs.

  5. Businesses Seek Fuel Cells to Meet Sustainability Goals, Provide...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Businesses Seek Fuel Cells to Meet Sustainability Goals, Provide Reliable Power Businesses Seek Fuel Cells to Meet Sustainability Goals, Provide Reliable Power January 12, 2016 - ...

  6. Goal Practice & Experience : Status Quo and Future for Industrial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Goal Practice & Experience : Status Quo and Future for Industrial Scale Biomass Energy Development in China Goal Practice & Experience : Status Quo and Future for Industrial Scale ...

  7. Guidance for Meeting Executive Order 13514 Water Goals | Department...

    Energy Savers [EERE]

    Water Efficiency Guidance for Meeting Executive Order 13514 Water Goals Guidance for Meeting Executive Order 13514 Water Goals The Federal Energy Management Program offers...

  8. Luminosity goals for a 100-TeV pp collider

    SciTech Connect (OSTI)

    Hinchliffe, Ian; Kotwal, Ashutosh; Mangano, Michelangelo L.; Quigg, Chris; Wang, Lian-Tao

    2015-04-23

    We consider diverse examples of science goals that provide a framework to assess luminosity goals for a future 100-TeV proton-proton collider.

  9. Petroleum Reserves Vision, Mission and Goals | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Petroleum Reserves Vision, Mission and Goals Petroleum Reserves Vision, Mission and Goals The mission of the Office of Petroleum Reserves is to protect the United States from...

  10. Los Alamos Demolition Work Progresses Toward Goal of Completing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Los Alamos Demolition Work Progresses Toward Goal of Completing Cleanup Los Alamos Demolition Work Progresses Toward Goal of Completing Cleanup January 14, 2016 - 12:20pm Addthis ...

  11. Luminosity goals for a 100-TeV pp collider

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Hinchliffe, Ian; Kotwal, Ashutosh; Mangano, Michelangelo L.; Quigg, Chris; Wang, Lian-Tao

    2015-08-20

    We consider diverse examples of science goals that provide a framework to assess luminosity goals for a future 100-TeV proton-proton collider.

  12. Los Angeles County's Green Idea House Achieves Efficient Goals...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    County's Green Idea House Achieves Efficient Goals Los Angeles County's Green Idea House Achieves Efficient Goals Photo of an energy-efficient home with modern architecture. The ...

  13. Institutional Change Process Step 1: Determine Goals | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Determine Goals Institutional Change Process Step 1: Determine Goals Process for Continuous Change The first step in the institutional change process for continuous change is ...

  14. Goals and Requirements | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    design and green building best practices Perform regional and local planning Increase water use efficiency and management Prevent pollution and eliminate waste Follow...

  15. Sandia National Laboratories: Pollution Prevention: Goals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in the Strategic Sustainability Performance Plan. (DOE SSPP) (DOE O 436.1) Sustainable Acquisition Ensure 95% of new contracts each year require sustainable acquisition....

  16. The Concept of Goals-Driven Safeguards

    SciTech Connect (OSTI)

    R. Wigeland; T Bjornard; B. Castle

    2009-02-01

    The IAEA, NRC, and DOE regulations and requirements for safeguarding nuclear material and facilities have been reviewed and each organizations purpose, objectives, and scope are discussed in this report. Current safeguards approaches are re-examined considering technological advancements and how these developments are changing safeguards approaches used by these organizations. Additionally, the physical protection approaches required by the IAEA, NRC, and DOE were reviewed and the respective goals, objectives, and requirements are identified and summarized in this report. From these, a brief comparison is presented showing the high-level similarities among these regulatory organizations approaches to physical protection. The regulatory documents used in this paper have been assembled into a convenient reference library called the Nuclear Safeguards and Security Reference Library. The index of that library is included in this report, and DVDs containing the full library are available.

  17. Materials Technologies: Goals, Strategies, and Top Accomplishments (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2010-08-01

    Document details the goals, strategies, and top accomplishments of DOE's Materials Technologies subprogram.

  18. Vehicle Technologies Program: Goals, Strategies, and Top Accomplishments (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2010-12-01

    Fact sheet describes the Vehicle Technologies Program and its goals, strategies and top accomplishments.

  19. Weatherization Assistance Program Goals and Metrics | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Goals and Metrics Weatherization Assistance Program Goals and Metrics UT - Bettelle - Oak Ridge National Laboratory Logo The U.S. Department of Energy (DOE) Weatherization Assistance Program (WAP) regularly reviews the work of states and grant recipients for effectiveness and for meeting program goals. DOE's Oak Ridge National Laboratory provides technical support to the program and conducts the evaluations. Goals The overall goal of WAP is to reduce the burden of energy prices on the

  20. Hydrogen Goal-Setting Methodologies Report to Congress

    Fuel Cell Technologies Publication and Product Library (EERE)

    DOE's Hydrogen Goal-Setting Methodologies Report to Congress summarizes the processes used to set Hydrogen Program goals and milestones. Published in August 2006, it fulfills the requirement under se

  1. Fiscal Year 2013 Small Business Contracting Goals | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fiscal Year 2013 Small Business Contracting Goals Fiscal Year 2013 Small Business Contracting Goals DOE has received the following revised small business contracting goals for FY13: PDF icon PF2013-32 Fiscal Year 2013 Small Business Contracting Goals PDF icon PF2013-32a.pdf More Documents & Publications Policy Flash 2016-06 POLICY FLASH 2015-26 Extension of SBA-DOE 8(a) Partnership Agreement

  2. Goals Framework Overview - 2016 BTO Peer Review | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Goals Framework Overview - 2016 BTO Peer Review Goals Framework Overview - 2016 BTO Peer Review Presenter: Jack Mayernik, National Renewable Energy Laboratory This presentation at the 2016 Peer Review provided an overview of the Building Technologies Office's Goals Framework. Through robust feedback, the BTO Program Peer Review enhances existing efforts and improves future designs. PDF icon 2016 BTO Peer Review Presentation-Goals Framework Overview More Documents & Publications Multi-Year

  3. Annual Performance Report FY 2011 Annual Performance Plan FY 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Office of Inspector General Annual Performance Report FY 2011 Annual Performance Plan FY 2012 2 FY 2011 OIG Performance Results The OIG measures its performance against long-term and annual goals set forth in OIG planning documents. During this reporting period, the OIG successfully achieved its FY 2011 performance goals. The following are the specific results: Goal 1 Promote Presidential Reform Initiatives, Secretarial Mission Priorities, and Congress Objective 1: Conduct

  4. Federal Progress Toward Energy/Sustainability Goals | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Progress Toward Energy/Sustainability Goals Federal Progress Toward Energy/Sustainability Goals Presentation offers an overview of progress made in federal facility energy management and sustainability based on fiscal year 2014 reported findings. PDF icon Download the Federal Progress Toward Energy/Sustainability Goals presentation.

  5. Project W420 Air Sampler Probe Placement Qualification Tests for Four 6-Inch Diameter Stacks: 296-A-25, 296-B-28, 296-S-22, and 296-T-18

    SciTech Connect (OSTI)

    Maughan, A.D.; Glissmeyer, J.A.

    1998-09-30

    The W420 project covers the upgrading of effluent monitoring systems at six ventilation exhaust stacks in tank-farm facilities at the U.S. Department of Energy's Hanford Site. The discharge stacks of five of the six systems will be completely replaced. Four of these (296-A-25, 296-B-28, 296-S-22, and 296-T-18) will be of the same size, 6-inches in diameter and about 12-ft high. This report documents tests that were conducted to verify that these four stacks meet the applicable regulatory criteria regarding the placement of the air sampling probe. These criteria ensure that the contaminants in the stack are well mixed with the airflow at the location of the probe such that the extracted sample represents the whole. There are also criteria addressing the transport of the sample to the collection device. These are not covered in this report, but will need to be addressed later. These tests were conducted by Pacific Northwest National Laboratory on a full-scale model of the 6-inch stick. The sequence of tests addresses the acceptability of the flow angle relative to the probe and the uniformity of air velocity and gaseous and particle tracers in the cross section of the stack. All tests were successful, and all acceptance criteria were met.

  6. Leveraging Tribal Renewable Resources to Support Military Energy Goals |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Leveraging Tribal Renewable Resources to Support Military Energy Goals Leveraging Tribal Renewable Resources to Support Military Energy Goals May 30-31, 2013 Image of a speaker at the forum. Chandler, Arizona Wild Horse Pass Hotel and Casino The Office of Indian Energy Tribal Leader Energy Forum on "Leveraging Tribal Renewable Resources to Support Military Energy Goals" was held May 30-31, 2013, in Chandler, Arizona. The forum provided information for western

  7. EMS Goals/Progress/Plans/Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EMS Goals/Progress/Plans/Reports EMS Goals/Progress/Plans/Reports Significant Environmental Aspects 2016 LM Significant Environmental Aspects Sustainability Progress Reports Datasheets - Consolidated Energy Data Report (CEDR) 2015 2014 Site Sustainability Plan (SSP) 2016 2015 Annual Site Environmental Report (ASER) 2014 2013 EMS Status LM EMS Annual Facility Data Report 2015 2014 More Information Guiding Documents and Links Declaration of Conformance Goals/Progress/Plans/Reports National

  8. Neutron Reference Benchmark Field Specification: ACRR 44 Inch Lead-Boron (LB44) Bucket Environment (ACRR-LB44-CC-32-CL).

    SciTech Connect (OSTI)

    Vega, Richard Manuel; Parma, Edward J.; Griffin, Patrick J.; Vehar, David W.

    2015-07-01

    This report was put together to support the International Atomic Energy Agency (IAEA) REAL- 2016 activity to validate the dosimetry community’s ability to use a consistent set of activation data and to derive consistent spectral characterizations. The report captures details of integral measurements taken in the Annular Core Research Reactor (ACRR) central cavity with the 44 inch Lead-Boron (LB44) bucket, reference neutron benchmark field. The field is described and an “a priori” calculated neutron spectrum is reported, based on MCNP6 calculations, and a subject matter expert (SME) based covariance matrix is given for this “a priori” spectrum. The results of 31 integral dosimetry measurements in the neutron field are reported.

  9. Radiation Characterization Summary: ACRR Central Cavity Free-Field Environment with the 32-Inch Pedestal at the Core Centerline (ACRR-FF-CC-32-cl).

    SciTech Connect (OSTI)

    Vega, Richard Manuel; Parma, Edward J.; Naranjo, Gerald E.; Lippert, Lance L.; Vehar, David W.; Griffin, Patrick J.

    2015-08-01

    This document presents the facilit y - recommended characteri zation o f the neutron, prompt gamma - ray, and delayed gamma - ray radiation fields in the Annular Core Research Reactor ( ACRR ) for the cen tral cavity free - field environment with the 32 - inch pedestal at the core centerline. The designation for this environmen t is ACRR - FF - CC - 32 - cl. The neutron, prompt gamma - ray , and delayed gamma - ray energy spectra , uncertainties, and covariance matrices are presented as well as radial and axial neutron and gamma - ray fluence profiles within the experiment area of the cavity . Recommended constants are given to facilitate the conversion of various dosimetry readings into radiation metrics desired by experimenters. Representative pulse operations are presented with conversion examples . Acknowledgements The authors wish to th ank the Annular Core Research Reactor staff and the Radiation Metrology Laboratory staff for their support of this work . Also thanks to David Ames for his assistance in running MCNP on the Sandia parallel machines.

  10. Thermal performance of an earth-sheltered passive solar residence

    SciTech Connect (OSTI)

    LaVigne, A.B. (Puget Sound Power and Light Co., Bellevue, WA); Schuldt, M.A.

    1981-01-01

    Results are presented of the measured thermal performance of a direct gain, passive solar residence in the Pacific Northwest. The east, west, and north exterior walls of the house are bermed to within 12 inches (30 cm) of the ceiling; sliding interior insulated panels cover the double glazed, south facing windows when appropriate. The cost of the house construction was kept modest.

  11. Hydrogen Program Goal-Setting Methodologies Report to Congress...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydrogen Program Goal-Setting Methodologies Report to Congress This Report to Congress, published in August 2006, focuses on the methodologies used by the DOE Hydrogen Program for ...

  12. Hydrogen Program Goal-Setting Methodologies Report to Congress

    Broader source: Energy.gov [DOE]

    This Report to Congress, published in August 2006, focuses on the methodologies used by the DOE Hydrogen Program for goal-setting.

  13. Volvo Trucks Achieves Lofty Energy and Carbon Goals

    SciTech Connect (OSTI)

    2011-03-31

    Case study - Volvo's New River Valley facility leveraged company and ITP resources to achieve plant-wide targets that surpass both corporate and Save Energy Now goals.

  14. Energy Efficiency Goals and Requirements for Public Entities

    Broader source: Energy.gov [DOE]

    There are numerous energy efficiency goals and requirements for various types of public and publicly-supported entities. The following descriptions highlight some of the most significant provisio...

  15. Journey to Excellence Goal 2 and Enhanced Tank Waste Strategy

    Office of Environmental Management (EM)

    Strategy Shirley J. Olinger Associate Principal Deputy for Corporate Operations Office of Environmental Management U.S. Department of Energy Agenda * Journey to Excellence - Goal 2...

  16. U.S. Federal Government - Green Power Purchasing Goal | Department...

    Broader source: Energy.gov (indexed) [DOE]

    of Defense, including fulfillment of other DOD energy goals in their alternative energy accounting Renewable electrical energy technologies are defined as solar, wind, biomass,...

  17. NNSA Production Office tops Feds Feed Families campaign goal...

    National Nuclear Security Administration (NNSA)

    tops Feds Feed Families campaign goal | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation...

  18. Improving Batteries for Electric Vehicle Use is Common Goal ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Improving Batteries for Electric Vehicle Use is Common Goal May 11, 2004 Golden, Colo. - The U.S. Department of Energy's National Renewable Energy Laboratory (NREL) will ...

  19. Annual Performance Report FY 2011 Annual Performance Plan FY...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Exceeded Goal 2d. By June, 2011, complete an annual risk-based programmatic assessment that considers OIG institutional knowledge; past program performance; funding levels; ...

  20. Quadrennial Energy Review: Scope, Goals, Vision, Approach, Outreach

    Broader source: Energy.gov [DOE]

    This slideshow explains the scope and goals of the first year of the Quadrennial Energy Review (QER). The first year of the QER focuses on energy transmission, storage, and distribution (TS&D).

  1. EM Exceeds Fiscal Year 2013 Small Business Goals

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – EM obligated nearly $385 million to prime small business contracts, or 7.9 percent of its $4.9 million procurement base, in fiscal year 2013, far surpassing its goals.

  2. Renewables Portfolio Standards and Goals | Open Energy Information

    Open Energy Info (EERE)

    Renewables Portfolio Standards and Goals Jump to: navigation, search This article is a stub. You can help OpenEI by expanding it. Retrieved from "http:en.openei.orgw...

  3. EM Exceeds Sustainability Goal by Reducing Carbon Footprint

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – EM has surpassed another DOE sustainability goal, this time reducing its carbon footprint by 44 percent, well ahead of the Department’s 15 percent target for fiscal year 2012.

  4. Clean Energy Projects Helping Wisconsin Tribe Achieve Sustainability Goals

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Projects Helping Wisconsin Tribe Achieve Sustainability Goals Clean Energy Projects Helping Wisconsin Tribe Achieve Sustainability Goals January 13, 2014 - 11:19am Addthis Before (left) and after photo of historic Wunder Hall, where Milwaukee's Forest County Potawatomi Community completed a major energy upgrade project. The building now serves as the tribe's economic development center. | Courtesy of Forest County Potawatomi Community Before (left) and after photo of

  5. Two Facilities, One Goal: Advancing America's Wind Industry | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Two Facilities, One Goal: Advancing America's Wind Industry Two Facilities, One Goal: Advancing America's Wind Industry November 27, 2013 - 1:35pm Addthis Energy Deputy Secretary Daniel Poneman speaks at the Clemson University Wind Turbine Drivetrain Testing Facility dedication in South Carolina. | Photo courtesy of Clemson University Energy Deputy Secretary Daniel Poneman speaks at the Clemson University Wind Turbine Drivetrain Testing Facility dedication in South Carolina. |

  6. Los Angeles County's Green Idea House Achieves Efficient Goals | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy County's Green Idea House Achieves Efficient Goals Los Angeles County's Green Idea House Achieves Efficient Goals Photo of an energy-efficient home with modern architecture. The Green Idea House (GIH), an innovative whole-home upgrade project in Los Angeles County, California, has released its latest electric bill, detailing its power consumption through June 2013. The results show that GIH produced more energy than it consumed over the course of a year, including zero combustion

  7. Energy Lab Sets Aggressive Greenhouse Gas Reduction Goal - News Releases |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NREL Energy Lab Sets Aggressive Greenhouse Gas Reduction Goal NREL pledges to cut carbon footprint, impact on environment by 75 percent December 4, 2007 The U.S. Department of Energy's National Renewable Energy Laboratory (NREL) has pledged to reduce its greenhouse gas emissions by 75 percent from 2005 to 2009. The new goal is part of NREL's participation in the Environmental Protection Agency's (EPA) Climate Leaders program and was announced at the Climate Leaders meeting in Boulder, Colo.,

  8. Department of Energy Achieves Goal of 200 Energy Savings Assessments |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Achieves Goal of 200 Energy Savings Assessments Department of Energy Achieves Goal of 200 Energy Savings Assessments March 2, 2007 - 10:28am Addthis Over 50 Trillion Btus of Natural Gas Savings Found AUSTIN, TX - The U.S. Department of Energy (DOE) Assistant Secretary for Energy Efficiency and Renewable Andy Karsner today announced the completion of Energy Savings Assessments (ESAs) at 200 of the largest industrial facilities in the nation, identifying opportunities to

  9. Report Explains How Bioenergy Supports Global Sustainability Goals |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Report Explains How Bioenergy Supports Global Sustainability Goals Report Explains How Bioenergy Supports Global Sustainability Goals May 4, 2015 - 12:47pm Addthis Agave sisilana growing in East Africa. Image courtesy of Jeff Cameron. Agave sisilana growing in East Africa. Image courtesy of Jeff Cameron. Willow to the rescue - combining bioenergy with waste treatment. Image courtesy of Par Aronsson. Willow to the rescue - combining bioenergy with waste treatment. Image

  10. Renewable portfolio standards in the states: balancing goals and rules

    Office of Scientific and Technical Information (OSTI)

    (Journal Article) | SciTech Connect Renewable portfolio standards in the states: balancing goals and rules Citation Details In-Document Search Title: Renewable portfolio standards in the states: balancing goals and rules Renewable portfolio standards establish a minimum percentage of electricity that retailers must provide from renewable energy sources. However, successful implementation must surmount the hurdle of RPS rules that vary from state to state along with their impacts on the

  11. Hanford Groundwater Contamination Areas Shrink as EM Exceeds Cleanup Goals

    Office of Environmental Management (EM)

    | Department of Energy Groundwater Contamination Areas Shrink as EM Exceeds Cleanup Goals Hanford Groundwater Contamination Areas Shrink as EM Exceeds Cleanup Goals June 26, 2013 - 12:00pm Addthis The 200 West Pump and Treat System is Hanford’s largest facility for treating contaminated groundwater. The 200 West Pump and Treat System is Hanford's largest facility for treating contaminated groundwater. A graphic showing the 200 West Pump and Treat plumes and well network. A graphic

  12. California National Guard Sustainability Planning, Hydrogen Fuel Goals |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy National Guard Sustainability Planning, Hydrogen Fuel Goals California National Guard Sustainability Planning, Hydrogen Fuel Goals Overview of California Guard Army Facilities, ANG Locations, Joint Forces Training Base (JFTB) in Los Alamitos PDF icon tspi_sendejas.pdf More Documents & Publications Transportation and Stationary Power Integration Workshop Attendees List Transportation and Stationary Power Integration: Workshop Proceedings Report of the DOD-DOE Workshop

  13. Shop Request - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Shop Request Note: You must be logged in to your Berkeley Lab LDAP account to access the Shop Request Form. 88 Work Request Shop Request ‎(Responses)‎ Open Spreadsheet

  14. Ion Sources - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    D. Grote, D. Leitner, J. Benitez, M. Strohmeier. Plasma-to-Target Warp Simulations of Uranium Beams Extracted from VENUS Compared to Emittance Measurements and Beam Images....

  15. New Users - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    from the Cyclotron, very affordable, and offers 57 tastefully appointed rooms with spectacular views of the San Francisco Bay and skyline. 3 Weeks Ahead Register with our Admin...

  16. Bragg Curves - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bragg Curves

  17. Beam Request - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    identify a suitable location on the schedule for your experiment. Determining priority: Radiation effects testing covered under the NSS Interagency Agreement and DOE nuclear...

  18. High Performance Sustainable Buildings

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Buildings Goal 3: High Performance Sustainable Buildings Maintaining the conditions of a building improves the health of not only the surrounding ecosystems, but also the well-being of its occupants. Energy Conservation» Efficient Water Use & Management» High Performance Sustainable Buildings» Greening Transportation» Green Purchasing & Green Technology» Pollution Prevention» Science Serving Sustainability» ENVIRONMENTAL SUSTAINABILITY GOALS at LANL The Radiological Laboratory

  19. Savannah River Site Achieves Transuranic Waste Disposition Goal in 2013 |

    Energy Savers [EERE]

    Department of Energy Site Achieves Transuranic Waste Disposition Goal in 2013 Savannah River Site Achieves Transuranic Waste Disposition Goal in 2013 December 24, 2013 - 12:00pm Addthis Workers gather behind a “Safety and Security begins with Me” banner at the Savannah River Site. Workers gather behind a "Safety and Security begins with Me" banner at the Savannah River Site. Workers sort through transuranic waste at the Savannah River Site. Workers sort through

  20. Energy Innovation Hubs: Achieving Our Energy Goals with Science |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Hubs: Achieving Our Energy Goals with Science Energy Innovation Hubs: Achieving Our Energy Goals with Science March 2, 2012 - 6:44pm Addthis Secretary Chu stops at Oak Ridge National Lab in February 2012 for a quick, nuclear-themed visit that included a tour of the Consortium for Advanced Simulation of Light Water Reactors (CASL) and a stop at the new Manufacturing Demonstration Facility (MDF). | Photo courtesy of Oak Ridge National Lab Secretary Chu stops at Oak Ridge

  1. Microsoft PowerPoint - Final Presentation - Surash.021611 EMAB Goal 6

    Office of Environmental Management (EM)

    www.em.doe.gov safety performance cleanup closure E M Environmental Management 1 Office of Environmental Management Journey to Excellence - Goal 6 J. E. Surash, P.E. Deputy Assistant Secretary Acquisition and Contract Management U.S. Department of Energy Bill Murphie Site Manager Portsmouth and Paducah Project Office U.S. Department of Energy February 24, 2011 Improve contract and project management with the objective of delivering results on time and within cost * Improve contract management

  2. Rebuilding It Better: Greensburg, Kansas; High Performance Buildings Meeting Energy Savings Goals (Brochure) (Revised)

    SciTech Connect (OSTI)

    Not Available

    2012-04-01

    This fact sheet provides a summary of how NREL's technical assistance in Greensburg, Kansas, helped the town rebuild green after recovering from a tornado in May 2007.

  3. The Adequacy of DOE Natural Phenomena Hazards Performance Goals from an Accident Analysis Perspective

    Office of Environmental Management (EM)

    Energy The 3D-Printed Shelby Cobra: Defining Rapid Innovation The 3D-Printed Shelby Cobra: Defining Rapid Innovation "He said he’d get in if he could drive." "He said he'd get in if he could drive." It's been hard to miss in the media and on its almost non-stop road tour, but AMO wanted you to know that our 3D-printed EV version of the 50th anniversary Shelby Cobra just left the Forrestal building lobby after visiting for two weeks. Secretary Moniz dropped in for a

  4. EM Goes Beyond DOE Goals Again to Reduce Carbon Footprint

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – EM reduced its carbon footprint by 34 percent in fiscal year 2015, exceeding the Department’s target of 19 percent, and moved past other sustainability goals DOE set in its initiative to cut greenhouse gas emissions and lower energy use intensity.

  5. Leveraging Tribal Renewable Resources to Support Military Energy Goals

    Energy Savers [EERE]

    LEVERAGING TRIBAL RENEWABLE RESOURCES TO SUPPORT MILITARY ENERGY GOALS May 30-31, 2013 WILD HORSE PASS HOTEL AND CASINO 5040 Wild Horse Pass Blvd. Chandler, Arizona The seventh in a series of planned U.S. DOE Office of Indian Energy-sponsored strategic energy development forums, this Tribal Leader Forum is designed to provide information for western U.S. tribal leaders and military leaders on the renewable energy resource development potential on tribal lands, and the opportunities for

  6. Seven Global Goals. 2013 annual report, Southwestern Power Administration

    SciTech Connect (OSTI)

    none,

    2014-09-01

    For over 70 years, Southwestern has marketed and delivered reliable, renewable, and affordable hydropower, partnering with Federal power stakeholders and others in the industry to make sure the lights stay on. This kind of effective, efficient, and cost conscious operation is made possible only by hard work and dedication. Southwestern employees work individually and as a team to meet seven comprehensive agency goals that touch on all aspects of the agency’s operations. Dubbed the “Seven Global Goals” by Administrator Chris Turner, these objectives identify specific, measurable targets that support Southwestern’s mission and reinforce its responsibilities toward its customers and the Nation.

  7. Advanced Combustion Engine R&D: Goals, Strategies, and Top Accomplishm...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Engine R&D: Goals, Strategies, and Top Accomplishments Advanced Combustion Engine R&D: Goals, Strategies, and Top Accomplishments PDF icon advcombustiongoals.pdf More Documents &...

  8. Getting from Goals to Projects in the Ground (Presentation)

    SciTech Connect (OSTI)

    Springer, B.

    2012-03-01

    Presentation given at the 2012 Department of Homeland Security Renewable Energy Roundtable on Energy Savings Performance Contracts (ESPCs) and Power Purchase Agreements (PPAs) for Renewable Energy (RE).

  9. Performance of a Small High-Pressure Xenon Detector at Sub-MeV Photon Energies with an Example Application to Ion Beam Analysis

    SciTech Connect (OSTI)

    Pallone, Arthur K.; Beyerle, Al; Demaree, John D.

    2009-03-10

    Ion beam analysis (IBA) is a nondestructive method that provides nondestructive compositional information of a sample. Many IBA techniques derive the information from high-energy photons produced by the interaction of the ion beam with the sample. The performance of a 1.53.8-inch cm diameter by 37.6-inch cm long high-pressure xenon (HPXe) detector is investigated at photon energies useful to IBA. The results for the HPXe detector are then used to predict the performance of larger HPXe detectors at those energies and recommendations are made for an HPXe system for IBA.

  10. Combined Fiscal Year (FY) 2015 Annual Performance Results and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Subject: Office of Inspector General's combined Fiscal Year (FY) 2015 Annual Performance Results and FYs 2016 and 2017 Annual Performance Plan This report presents the goals, ...

  11. Combined Fiscal Year (FY) 2014 Annual Performance Results and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Subject: Office of Inspector General's combined Fiscal Year (FY) 2014 Annual Performance Results and FYs 2015 and 2016 Annual Performance Plan This report presents the goals, ...

  12. Corporate Analysis of DOE Safety Performance | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Current Safety Performance Trends The Office of Environment, Health, Safety and Security, ... Strategic Safety Goals Occupational Safety Performance Occurrence Reporting Trends For ...

  13. Performance Analysis Tools Working Session | U.S. DOE Office...

    Office of Science (SC) Website

    Print Text Size: A A A FeedbackShare Page 2011 Exascale Tools Workshop Performance Analysis Tools Working Session Panel Questions: What are our application performance goals for ...

  14. Materials Technologies: Goals, Strategies, and Top Accomplishments (Brochure), Vehicle Technologies Program (VTP)

    Broader source: Energy.gov [DOE]

    Document details the goals, strategies, and top accomplishments of DOE's Materials Technologies subprogram.

  15. Vehicle Technologies Program: Goals, Strategies, and Top Accomplishments (Brochure), Vehicle Technologies Program (VTP)

    Broader source: Energy.gov [DOE]

    Fact sheet describes the Vehicle Technologies Program and its goals, strategies and top accomplishments.

  16. Reliable Muddle: Transportation Scenarios for the 80% Greenhouse Gas Reduction Goal for 2050 (Presentation)

    SciTech Connect (OSTI)

    Melaina, M.; Webster, K.

    2009-10-28

    Presentation describing transportation scenarios for meeting the 2050 DOE goal of reducing greenhouse gases by 80%.

  17. Fuel Technologies: Goals, Strategies, and Top Accomplishments; Vehicle Technologies Program (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2009-04-01

    Fact sheet describes the top accomplishments, goals, and strategies of DOE's Fuel Technologies sub program.

  18. Science Goals for the ARM Recovery Act Radars

    SciTech Connect (OSTI)

    JH Mather

    2012-05-29

    Science Goals for the ARM Recovery Act Radars. In October 2008, an ARM workshop brought together approximately 30 climate research scientists to discuss the Atmospheric Radiation Measurement (ARM) Climate Research Facility's role in solving outstanding climate science issues. Through this discussion it was noted that one of ARM's primary contributions is to provide detailed information about cloud profiles and their impact on radiative fluxes. This work supports cloud parameterization development and improved understanding of cloud processes necessary for that development. A critical part of this work is measuring microphysical properties (cloud ice and liquid water content, cloud particle sizes, shapes, and distribution). ARM measurements and research have long included an emphasis on obtaining the best possible microphysical parameters with the available instrumentation. At the time of the workshop, this research was reaching the point where additional reduction in uncertainties in these critical parameters required new instrumentation for applications such as specifying radiative heating profiles, measuring vertical velocities, and studying the convective triggering and evolution of three-dimensional (3D) cloud fields. ARM was already operating a subset of the necessary instrumentation to make some progress on these problems; each of the ARM sites included (and still includes) a cloud radar (operating at 35 or 94 GHz), a cloud lidar, and balloon-borne temperature and humidity sensors. However, these measurements were inadequate for determining detailed microphysical properties in most cases. Additional instrumentation needed to improve retrievals of microphysical processes includes radars at two additional frequencies for a total of three at a single site (35 GHz, 94 GHz, and a precipitation radar) and a Doppler lidar. Evolving to a multi-frequency scanning radar is a medium-term goal to bridge our understanding of two-dimensional (2D) retrievals to the 3D cloud field. These additional microphysical measurements would allow detailed cloud properties to be derived even in the presence of light precipitation. It is important to couple these detailed measurements of cloud microphysics to vertical motion on the cloud scale to couple microphysics with meteorological processes. Vertically pointing Doppler radars provide the vertical motion of cloud particles but, to separate particle motion from air motion, a wind profiler is required. The American Recovery and Reinvestment Act provided the means to address these needs and implement a multi-frequency suite of radars, including scanning radars, at each of the ARM sites. In addition, Doppler lidars have been deployed at several sites. With these new measurement capabilities, ARM has the measurement capabilities to tackle the problems of improving microphysical profile descriptions and evaluating the relationship between our current narrow-field-of view, zenith perspective on clouds to a description of the full 3D cloud field and its temporal evolution.

  19. The relationship of ecosystem management to NEPA and its goals

    SciTech Connect (OSTI)

    Phillips, C.G.; Randolph, J.

    2000-07-01

    The National Environmental Policy Act of 1969 (NEPA) was intended to promote a systematic, comprehensive, interdisciplinary approach to planning and decision making, including the integration of the natural and social sciences and the design arts. NEPA critics have cited three key shortcomings in its implementation: (1) a lack of engagement with the NEPA process early in the planning process through interdisciplinary collaboration; (2) a lack of rigorous science and the incorporation of ecological principles and techniques; and (3) a lack of emphasis on the Act's substantive goals and objectives. In recent years and independent of NEPA, a policy of ecosystem management has been developed, which represents a fundamental change from a fragmented, incremental planning and management approach to a holistic, comprehensive, interdisciplinary land and resource management effort. The authors postulate that by incorporating ecosystem management principles in their planning and decisionmaking, federal agencies can address the shortcomings in NEPA implementation and move closes to NEPA's intent. A case analysis of EISs prepared by the USDA Forest Service before and after adopting an ecosystem management approach supports their hypothesis.

  20. CESP Tool 5.1: Goals, Strategies, and Actions Planning Worksheet |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 5.1: Goals, Strategies, and Actions Planning Worksheet CESP Tool 5.1: Goals, Strategies, and Actions Planning Worksheet CESP Tool 5.1: Goals, Strategies, and Actions Planning Worksheet from Step 5: Develop Energy Goals and Strategies, Guide to Community Energy Strategic Planning. File CESP Tool 5.1: Goals, Strategies, and Actions Planning Worksheet More Documents & Publications cesp_tool_5-1_goals_strategies_actions_planning_worksheet_1.docx Guide to Community Energy

  1. Hawai'i Makes Progress Toward Clean Energy Goals with Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hawai'i Makes Progress Toward Clean Energy Goals with Energy Department Assistance Hawai'i ... To meet the HCEI'sclean energy goal, 30% of Hawai'i's electricity demand must be ...

  2. Mayor Muoio Announces Bigger Energy-Saving Goal and New Efficiency...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mayor Muoio Announces Bigger Energy-Saving Goal and New Efficiency Upgrades Mayor Muoio Announces Bigger Energy-Saving Goal and New Efficiency Upgrades February 24, 2016 - 9:25am ...

  3. Update on U.S. Department of Energy Building America Program Goals |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Program Goals Update on U.S. Department of Energy Building America Program Goals These presentations offer information about current Building America program goals and activities, as outlined in the Technical Update meeting on April 29-30, 2013. PDF icon ba_roadmap_highperformance_werling.pdf PDF icon collective_impact_znerh_rashkin.pdf More Documents & Publications Update on U.S. Department of Energy Building America Program Goals Collective Impact for Zero Net

  4. Volvo Trucks Achieves Lofty Energy and Carbon Goals | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Volvo Trucks Achieves Lofty Energy and Carbon Goals Volvo Trucks Achieves Lofty Energy and Carbon Goals This case study describes how Volvo Truck's New River Valley facility in Dublin, Virgina, was able to achieve plant-wide targets that surpassed both corporate and DOE program energy and carbon goals. PDF icon Volvo Trucks Achieves Lofty Energy and Carbon Goals (March 2011) More Documents & Publications Volvo: Certification of an Integrated ISO 14001 and ISO 50001/SEP System Metal and Glass

  5. Technology and U.S. Emissions Reductions Goals: Results of the EMF 24 Modeling Exercise

    SciTech Connect (OSTI)

    Clarke, Leon E.; Fawcett, Allen; Weyant, John; McFarland, Jim; Chaturvedi, Vaibhav; Zhou, Yuyu

    2014-09-01

    This paper discusses Technology and U.S. Emissions Reductions Goals: Results of the EMF 24 Modeling Exercise

  6. Advanced Combustion Engine R&D: Goals, Strategies, and Top Accomplishments (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2009-03-01

    Fact sheet describes the top accomplishments, goals and strategies of DOEs Advanced Combustion Engine Research and Development sub program.

  7. Workers at Hanford Site Achieve Recovery Act Legacy Cleanup Goals Ahead of Schedule

    Broader source: Energy.gov [DOE]

    The Hanford Site recently surpassed American Recovery and Reinvestment Act goals to accelerate the cleanup of legacy waste and fuels.

  8. Hawai'i Establishes Goal of Achieving 70% Clean Energy by 2030 | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Hawai'i Establishes Goal of Achieving 70% Clean Energy by 2030 Hawai'i Establishes Goal of Achieving 70% Clean Energy by 2030 With a clean energy goal of 70% by 2030, which can be considered the most aggressive state goal in the United States, Hawai'i has become a leader in the implementation and demonstration of clean energy technologies. The state introduced formality to its goal development process, engaging a variety of stakeholders and setting up focused working groups to

  9. Update on U.S. Department of Energy Building America Program Goals |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Update on U.S. Department of Energy Building America Program Goals Update on U.S. Department of Energy Building America Program Goals These presentations offer information about current Building America program goals and activities, as outlined in the Technical Update meeting on April 29-30, 2013. PDF icon ba_roadmap_highperformance_werling.pdf PDF icon collective_impact_znerh_rashkin.pdf More Documents & Publications Update on U.S. Department of Energy Building

  10. ReEDS Modeling of the President's 2020 U.S. Renewable Electricity Generation Goal (Presentation)

    SciTech Connect (OSTI)

    Zinaman, O.; Mai, T.; Lantz, E.; Gelman, R.; Porro, G.

    2014-05-01

    President Obama announced in 2012 an Administration Goal for the United States to double aggregate renewable electricity generation from wind, solar, and geothermal sources by 2020. This analysis, using the Regional Energy Deployment System (ReEDS) model, explores a full range of future renewable deployment scenarios out to 2020 to assess progress and outlook toward this goal. Under all modeled conditions, consisting of 21 scenarios, the Administration Goal is met before 2020, and as early as 2015.

  11. Goal Practice & Experience : Status Quo and Future for Industrial Scale

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Biomass Energy Development in China | Department of Energy Goal Practice & Experience : Status Quo and Future for Industrial Scale Biomass Energy Development in China Goal Practice & Experience : Status Quo and Future for Industrial Scale Biomass Energy Development in China Breakout Session 3D-Fostering Technology Adoption III: International Market Opportunities in Bioenergy Goal Practice & Experience : Status Quo and Future for Industrial Scale Biomass Energy Development in

  12. Connecting HPC and High Performance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HPC and High Performance Networks for Scientists and Researchers SC15 Austin, Texas November 18, 2015 1 Agenda 2 * Welcome and introductions * BoF Goals * Overview of National Research & Education Networks at work Globally * Discuss needs, challenges for leveraging HPC and high-performance networks * HPC/HTC pre-SC15 ESnet/GEANT/Internet2 survey results overview * Next steps discussion * Closing and Thank You BoF: Connecting HPC and High Performance Networks for Scientists and Researchers

  13. Getting on the same page: Performance Excellence | Y-12 National...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the same page: Performance Excellence Posted: July 16, 2015 - 5:47pm CNS Strategic Goals, Core Values and Daily Absolutes Lately, Morgan Smith, Chief Operating Officer for...

  14. Recovery Act Helps Y-12 Exceed Cleanup Goal at Manhattan Project...

    National Nuclear Security Administration (NNSA)

    Helps Y-12 Exceed Cleanup Goal at Manhattan Project-Era Building | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the...

  15. X-ray Science Division: Mission and Goals | Advanced Photon Source

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    X-Ray Science Division (XSD) Search Button About Welcome Overview Visiting the APS Mission & Goals Find People Organization Charts Committees Job Openings User Information...

  16. U.S. Army Energy and Environmental Requirements and Goals: Opportuniti...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Logistics U.S. Army Energy and Environmental Requirements and Goals: Opportunities for Fuel Cells and Hydrogen - Facility Locations and Hydrogen StorageDelivery Logistics ...

  17. "Furthering Your Local Governments' Energy Efficiency Goals-- Part 1- Getting Support From Local Leaders "

    Broader source: Energy.gov [DOE]

    DOE’s technical assistance program webcast on furthering your local government’s energy efficiency goals. This is part one, gaining support from local leaders.

  18. Advanced Combustion Engine R&D: Goals, Strategies, and Top Accomplishments

    Office of Energy Efficiency and Renewable Energy (EERE)

    Fact sheet describing the goals, strategies, and some of the major accomplishments of the Advanced Combustion Engine R&D subprogram of VTP.

  19. cesp_tool_5-1_goals_strategies_actions_planning_worksheet_1.docx...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications CESP Tool 5.1: Goals, Strategies, and Actions Planning Worksheet Guide to Community Energy Strategic Planning Guide to Community Energy Strategic ...

  20. First-ever ieRoadmap Workshop Reviews Progress in Achieving Roadmap Goals |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy First-ever ieRoadmap Workshop Reviews Progress in Achieving Roadmap Goals First-ever ieRoadmap Workshop Reviews Progress in Achieving Roadmap Goals On May 28-29, 2008, the first ieRoadmap Workshop was held to assist the energy sector in assessing alignment of current industry projects with the goals outlined in the Roadmap to Secure Control Systems in the Energy Sector. PDF icon First-ever ieRoadmap Workshop Reviews Progress in Achieving Roadmap Goals More Documents

  1. Advanced Combustion Engine R&D: Goals, Strategies, and Top Accomplishments

    SciTech Connect (OSTI)

    2009-03-02

    Fact sheet describing the goals, strategies, and some of the major accomplishments of the Advanced Combustion Engine R&D subprogram of the Vehicle Technologies Program.

  2. Goals, Strategies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the quality and integrity of our science and engineering solutions Strategically invest in breakthrough science and engineering Lead in transformational science at extremes...

  3. Radiation Characterization Summary: ACRR Polyethylene-Lead-Graphite (PLG) Bucket Located in the Central Cavity on the 32-Inch Pedestal at the Core Centerline (ACRR-PLG-CC-32-cl).

    SciTech Connect (OSTI)

    Parma, Edward J.,; Vehar, David W.; Lippert, Lance L.; Griffin, Patrick J.; Naranjo, Gerald E.; Luker, Spencer M.

    2015-06-01

    This document presents the facility-recommended characterization of the neutron, prompt gamma-ray, and delayed gamma-ray radiation fields in the Annular Core Research Reactor (ACRR) for the polyethylene-lead-graphite (PLG) bucket in the central cavity on the 32-inch pedestal at the core centerline. The designation for this environment is ACRR-PLG-CC-32-cl. The neutron, prompt gamma-ray, and delayed gamma-ray energy spectra, uncertainties, and covariance matrices are presented as well as radial and axial neutron and gamma-ray fluence profiles within the experiment area of the bucket. Recommended constants are given to facilitate the conversion of various dosimetry readings into radiation metrics desired by experimenters. Representative pulse operations are presented with conversion examples. Acknowledgements The authors wish to thank the Annular Core Research Reactor staff and the Radiation Metrology Laboratory staff for their support of this work. Also thanks to David Ames for his assistance in running MCNP on the Sandia parallel machines.

  4. Detector #2 Data Sheet - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    topological singularities from a discretized complex scalar field (Journal Article) | SciTech Connect Detecting vortices in superconductors: Extracting one-dimensional topological singularities from a discretized complex scalar field Citation Details In-Document Search Title: Detecting vortices in superconductors: Extracting one-dimensional topological singularities from a discretized complex scalar field Authors: Phillips, Carolyn L. ; Peterka, Tom ; Karpeyev, Dmitry ; Glatz, Andreas

  5. 4A Drawings - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Protons‎ > ‎ 4A Drawings 4A Translator Table Setup 4A Translator Horizontal 4A Translator Vertical

  6. 4B Drawings - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4B Drawings 4B Chamber 4B Mounting Bracket 4B Feedthrough Hole 4B Cooling Plate (-30 C)

  7. Gasoline prices inch down slightly (long version)

    U.S. Energy Information Administration (EIA) Indexed Site

    Energy Information Administration. Pump prices were highest in the West Coast region at 3.84 a gallon, down 5.2 cents from a week ago. Prices were lowest in the Gulf Coast States at ...

  8. Gasoline prices inch up (long version)

    U.S. Energy Information Administration (EIA) Indexed Site

    Pump prices were highest in the West Coast region at 3.88 a gallon, down 1.1 cents from a week ago. Followed by prices in the Midwest at 3.87 a gallon, up 3 cents. Prices were ...

  9. Gasoline prices inch down (short version)

    U.S. Energy Information Administration (EIA) Indexed Site

    on Monday. That's down 1.6 cents from a week ago, based on the weekly price survey by the U.S. Energy Information Administration. This is Amerine Woodyard, with EIA, in ...

  10. Gasoline prices inch down slightly (short version)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    short version) The U.S. average retail price for regular gasoline fell slightly to 3.54 a gallon on Monday. That's down 6-tenths of a penny from a week ago, based on the weekly...

  11. BASE - Rad Effects - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    at Lawrence Berkeley National Laboratory to provide beams of protons and heavy ions for radiation effects testing. When running, the facility is manned 24-hours a day with...

  12. BASE Operator's Manual - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BASE Operator's Manual BASE_Facility_-_SEE_Software_Operation.doc

  13. Gasoline prices inch down (Short version)

    U.S. Energy Information Administration (EIA) Indexed Site

    short version) The U.S. average retail price for regular gasoline rose slightly to 3.66 a gallon on Monday. That's up nine tenths of a penny from a week ago, based on the weekly ...

  14. LBNL Affiliate Forms - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    New Users‎ > ‎ LBNL Affiliate Forms Affiliate Forms (click here to open pdf)

  15. Cocktails and Ions - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cocktails and Ions BASE Ion List Download as a .pdf

  16. Rebuilding It Better: Greensburg, Kansas, High Performance Buildings Meeting Energy Savings Goals (Brochure) (Revised), Energy Efficiency & Renewable Energy (EERE)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4, 2007, a massive tornado destroyed or severely damaged 95% of Greensburg, Kansas. Since then, city and community leaders have been committed to rebuilding the town as a model sustainable community. Experts from the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) worked with city leaders, business owners, and residents to identify ways to incorporate energy efficiency and renewable energy technologies into the new buildings. The town showcases energy-saving

  17. Policy Flash 2014-39 Initiatives to Achieve Strategic Plan 2014-2018 Performance Goal Focused on Cost Savings

    Broader source: Energy.gov [DOE]

    Questions concerning this policy flash should be directed to Scott Clemons of the Strategic Programs Division, Office of Contract Management, at (202) 287-1554 or at Scott.Clemons@hq.doe.gov.

  18. Building America Performance Analysis Procedures: Revision 1

    SciTech Connect (OSTI)

    2004-06-01

    To measure progress toward multi-year research goals, cost and performance trade-offs are evaluated through a series of controlled field and laboratory experiments supported by energy analysis techniques using test data to calibrate simulation models.

  19. A Bold Goal: Boston Manufacturing R&D Workshop Video | Department of Energy

    Energy Savers [EERE]

    Videos » A Bold Goal: Boston Manufacturing R&D Workshop Video A Bold Goal: Boston Manufacturing R&D Workshop Video View the video from Jim Brodrick's opening presentation at the April 2011 DOE SSL Manufacturing R&D Workshop in Boston, Massachusetts. View the text-alternative version.

  20. Sootblowing optimization for improved boiler performance

    DOE Patents [OSTI]

    James, John Robert; McDermott, John; Piche, Stephen; Pickard, Fred; Parikh, Neel J.

    2012-12-25

    A sootblowing control system that uses predictive models to bridge the gap between sootblower operation and boiler performance goals. The system uses predictive modeling and heuristics (rules) associated with different zones in a boiler to determine an optimal sequence of sootblower operations and achieve boiler performance targets. The system performs the sootblower optimization while observing any operational constraints placed on the sootblowers.

  1. Sootblowing optimization for improved boiler performance

    DOE Patents [OSTI]

    James, John Robert; McDermott, John; Piche, Stephen; Pickard, Fred; Parikh, Neel J

    2013-07-30

    A sootblowing control system that uses predictive models to bridge the gap between sootblower operation and boiler performance goals. The system uses predictive modeling and heuristics (rules) associated with different zones in a boiler to determine an optimal sequence of sootblower operations and achieve boiler performance targets. The system performs the sootblower optimization while observing any operational constraints placed on the sootblowers.

  2. Rebuilding It Better: Greensburg, Kansas, High Performance Buildings

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Meeting Energy Savings Goals (Brochure) | Department of Energy Rebuilding It Better: Greensburg, Kansas, High Performance Buildings Meeting Energy Savings Goals (Brochure) Rebuilding It Better: Greensburg, Kansas, High Performance Buildings Meeting Energy Savings Goals (Brochure) This fact sheet provides a summary of how NREL's technical assistance in Greensburg, Kansas, helped the town rebuild green after recovering from a tornado in May 2007. PDF icon Rebuilding It Better: Greensburg,

  3. Development of an Updated Societal-Risk Goal for Nuclear Power Safety

    SciTech Connect (OSTI)

    Vicki Bier; Michael Corradini; Robert Youngblood; Caleb Roh; Shuji Liu

    2014-07-01

    This report briefly summarizes work done in FY 2013 on the subject LDRD. The working hypothesis is that societal disruption should be addressed in a safety goal. This is motivated by the point that the Fukushima disaster resulted in very little public dose, but enormous societal disruption; a goal that addressed societal disruption would fill a perceived gap in the US NRC safety goal structure. This year's work entailed analyzing the consequences of postulated accidents at various reactor sites in the US, specifically with a view to quantifying the number of people relocated and the duration of their relocation, to see whether this makes sense as a measure of societal disruption.

  4. FOIA Backlog Reduction Goals, fiscal years 2008,2009 and 2010. | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Backlog Reduction Goals, fiscal years 2008,2009 and 2010. FOIA Backlog Reduction Goals, fiscal years 2008,2009 and 2010. FOIA Backlog Reduction Goals with respect to the numbers of FOIA requests and administrative appeals to be processed for the next three fiscal years as well as the number of requests and number of appeals it expects to be pending beyond the statutory time period at the end of each fiscal year for Fiscal Years 2008, 2009, and 2010. PDF icon FOIA Backlog Reduction

  5. What Weve Learned from a Challenging Efficiency Goal

    Office of Environmental Management (EM)

    We've Learned From a Challenging Efficiency Goal Wendell Brase University of California, Irvine Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR November 3-4, 2015 Houston, TX "And when I challenged colleges to reduce their energy use 20 percent by 2020, UC Irvine went ahead and did it last year. Done! So UC Irvine is ahead of the curve." President Barack Obama UCI Commencement June 14, 2014 What is a feasible energy efficiency goal? Facility Type Goal Laboratory building

  6. EM Rolls Ahead of DOE Goals to Trim Vehicle Fleet Inventory

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – EM exceeded a DOE goal to reduce its vehicle fleet inventory, advancing the Department’s broader initiative to cut greenhouse gas emissions and decrease petroleum consumption across the complex.

  7. LM to Meet Energy Metering Goals Through Enhanced Data Collection at Groundwater Treatment Systems

    Broader source: Energy.gov [DOE]

    The federal government, including the U.S. Department of Energy (DOE) Office of Legacy Management (LM), has been challenged by Executive and DOE orders to reach two goals related to energy usage...

  8. OAR 660-015 - Land Use Planning Statewide Planning Goals | Open...

    Open Energy Info (EERE)

    60-015 - Land Use Planning Statewide Planning Goals Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: OAR 660-015 - Land Use...

  9. NREL and DoD - Complementary Missions, Shared Goals: Comprehensive Energy Solutions (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2012-12-01

    By collaborating with the country's only national laboratory solely dedicated to advanced renewable energy, energy efficiency, and energy systems integration, DoD can leverage NREL's facilities and expertise to accelerate achievement of energy goals.

  10. Reaching Social Media Goals on Facebook, Twitter | OpenEI Community

    Open Energy Info (EERE)

    Reaching Social Media Goals on Facebook, Twitter Home > Groups > OpenEI Community Central Graham7781's picture Submitted by Graham7781(2017) Super contributor 4 March, 2010 - 14:44...

  11. Hawai'i Establishes Goal of Achieving 70% Clean Energy by 2030...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hawai'i Establishes Goal of Achieving 70% Clean Energy by 2030 Assessing Pathways in the U.S. Virgin Islands and Hawai'i Hawai'i's Evolution: Hawai'i Powered. Technology Driven.

  12. Performance Characterization

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procurement and Acquisition » Guidance » Contracting for Support Services » Performance Based Service Acquisition Toolkit Performance Based Service Acquisition Toolkit Performance-based Service Acquisition (PBA) means an acquisition structured around the results to be achieved as opposed to the manner by which the work is to be performed. Performance-based Work Statement (PWS) means that a statement of work for performance-based acquisitions that describes the required results in clear,

  13. Performance Modeling

    Office of Scientific and Technical Information (OSTI)

    The prediction methodology will form the foundation of a more robust resource management ... Accurate performance prediction requires accurate performance models of the components ...

  14. Performance Monitoring

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Optimization » Performance Monitoring Performance Monitoring A redirector page has been set up without anywhere to redirect to. Last edited: 2016-04-29 11:34:30

  15. Optimizing Performance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Optimizing Performance Optimizing Performance Storage Optimization Optimizing the sizes of the files you store in HPSS and minimizing the number of tapes they are on will lead to...

  16. Performance Monitoring

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Optimization Performance Monitoring Performance Monitoring A redirector page has been set up without anywhere to redirect to. Last edited: 2014-08-25 14:37:27...

  17. Application Performance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NESAP Application Porting and Performance IXPUG Performance and Debugging Tools Measuring Arithmetic Intensity Training & Tutorials Software Policies User Surveys NERSC Users...

  18. OSTI's Vision, Mission, and Goals | OSTI, US Dept of Energy, Office of

    Office of Scientific and Technical Information (OSTI)

    Scientific and Technical Information OSTI's Vision, Mission, and Goals About | OSTI Strategic Plan | Catalogue of Collections | Organization Chart | Achievements | Alliances | OSTI History As detailed in the U.S. Department of Energy Office of Scientific and Technical Information 2015-2019 Strategic Plan, following are OSTI's vision, mission, and goals: Vision The Office of Scientific and Technical Information will fulfill a critical U.S. Department of Energy mission to ensure long-term

  19. Microsoft PowerPoint - Final Presentation - Olinger.EMAB Presentation Goals 1 and 2 sjo (4)

    Office of Environmental Management (EM)

    1 and 2 Tank Waste and Lifecycle Costs Shirley J. Olinger Shirley J. Olinger Associate Principal Deputy for Associate Principal Deputy for Corporate Operations Corporate Operations Office of Environmental Management Office of Environmental Management U.S. Department of Energy U.S. Department of Energy Agenda Agenda Journey to Excellence Journey to Excellence - - Goal 1: Status Three Major Goal 1: Status Three Major Tank Waste Projects Tank Waste Projects Journey to Excellence Journey to

  20. DOE Technology Performance Exchange

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Studer, Daniel.Studer@nrel.gov National Renewable Energy Laboratory NREL - DOE Technology Performance Exchange 2015 Building Technologies Office Peer Review 2 Project Summary Timeline: Start date: January 27, 2012 Planned end date: November 20, 2015 Key Milestones 1. Calibrated Energy Model; 5/22/15 2. BPA Sector Simulation; 10/16/15 Budget: BTO $ to date: $769,000 FEMP $ to date: $565,000 Other $ to date: $323,759 Total future DOE $: TBD Key Partners: Project Goal: Provides a pipeline for

  1. Developing air quality goals and policies for long-range plans

    SciTech Connect (OSTI)

    Full, D.J.; Mitchell, D.

    1995-12-01

    Air Quality Guidelines for General Plans (Air Quality Guidelines) is a guidance document and resource for cities and counties to use to address air quality in their long-range planning efforts. It includes goals, policies, and programs that when adopted as part of a long-range plan will reduce vehicle trips and miles traveled and improve air quality. Although this is a voluntary program, the San Joaquin Valley Unified Air Pollution Control District (District) has strongly encouraged cities and counties in the San Joaquin Valley to use their land use and transportation planning authority to help achieve air quality goals by adopting the policies and programs suggested by the Air Quality Guidelines. Implementing the goals and policies will result in a win-win situation where cities, counties, and developers save money through more efficient land use and transportation systems and where the public benefits from a more livable community and better air quality. The purpose of the Air Quality Guidelines is threefold: (1) to provide local planning agencies with a comprehensive set of goals and policies that will improve air quality if adopted as part of a long-range plan; (2) to provide a guide to cities and counties for determining which goals and policies are appropriate in their particular community; and (3) to provide justification and rationale for the goals and policies that will convince decision-makers and the public that they are appropriate and necessary.

  2. performance metrics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    people Our People NNSA has the best science, technology and engineering in the world, and we are fortunate to have dedicated professionals who are truly leaders in their fields working every day to promote our nuclear security mission. The people who make up the nuclear security enterprise are on the front lines... Working at NNSA A wide variety of career paths can help you find the type of job that suits your professional goals and lay the groundwork for personal development and career

  3. Performance Tuning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance Tuning Performance Tuning Hints and tips on how to optimize your Burst Buffer performance Note: this only applies to the Cori Phase 1 Burst Buffer and should not be taken as general Burst Buffer advice. This page will be updated as the DataWarp software is updated and performance continues to improve. For larger files, ensure your Burst Buffer allocation will be striped over multiple nodes Currently, the Burst Buffer granularity is 213GB. If you request an allocation smaller than

  4. NNSA Production Office tops Feds Feed Families campaign goal | Y-12

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    National Security Complex tops ... NNSA Production Office tops Feds Feed Families campaign goal Posted: September 16, 2013 - 9:45am Oak Ridge, Tenn. - Employees of the National Nuclear Security Administration Production Office have donated 17,348 pounds of food as part of the annual U.S. Department of Energy's "Feds Feed Families" campaign. The campaign, which ended on September 6, surpassed the goal of 17,000 pounds. "I am extremely proud and moved by the generosity of NPO

  5. Hawai'i Makes Progress Toward Clean Energy Goals with Energy Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assistance | Department of Energy Hawai'i Makes Progress Toward Clean Energy Goals with Energy Department Assistance Hawai'i Makes Progress Toward Clean Energy Goals with Energy Department Assistance July 29, 2014 - 4:50pm Addthis Set in the Waianae Valley of Oahu, Kaupuni Village is the first net-zero energy affordable housing community in Hawaii.| Photo by Ryan Siphers / Group 70, NREL 20155 Set in the Waianae Valley of Oahu, Kaupuni Village is the first net-zero energy affordable housing

  6. U.S. Utility-Scale Solar 60 Percent Towards Cost-Competition Goal |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Utility-Scale Solar 60 Percent Towards Cost-Competition Goal U.S. Utility-Scale Solar 60 Percent Towards Cost-Competition Goal February 12, 2014 - 11:05am Addthis News Media Contact (202) 586-4940 WASHINGTON - The Energy Department announced today that the U.S. solar industry is more than 60 percent of the way to achieving cost-competitive utility-scale solar photovoltaic (PV) electricity - only three years into the Department's decade-long SunShot Initiative. To help

  7. Mayor Muoio Announces Bigger Energy-Saving Goal and New Efficiency Upgrades

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Mayor Muoio Announces Bigger Energy-Saving Goal and New Efficiency Upgrades Mayor Muoio Announces Bigger Energy-Saving Goal and New Efficiency Upgrades February 24, 2016 - 9:25am Addthis News Media Contact 202-586-4940 DOENews@hq.doe.gov WEST PALM BEACH, Fla. - As part of the Obama Administration's efforts to cut energy waste in the nation's buildings, the U.S. Department of Energy (DOE) today recognized the city of West Palm Beach for their leadership in improving

  8. Hanford Exceeds Annual Goal for Cleaning up Groundwater near Columbia River

    Energy Savers [EERE]

    | Department of Energy Exceeds Annual Goal for Cleaning up Groundwater near Columbia River Hanford Exceeds Annual Goal for Cleaning up Groundwater near Columbia River August 28, 2014 - 12:00pm Addthis An aerial photo of Hanford’s 100-D Area along the Columbia River, which is served by one of five pump-and-treat systems along the Columbia River that are helping shrink areas of contaminated groundwater. An aerial photo of Hanford's 100-D Area along the Columbia River, which is served by

  9. Damping test results for straight sections of 3-inch and 8-inch unpressurized pipes. [PWR; BWR

    SciTech Connect (OSTI)

    Ware, A.G.; Thinnes, G.L.

    1984-04-01

    EG and G Idaho is assisting the Nuclear Regulatory Commission and the Pressure Vessel Research Committee in supporting a final position on revised damping values for structural analyses of nuclear piping systems. As part of this program, a series of vibrational tests on unpressurized 3-in. and 8-in. Schedule 40 carbon steel piping was conducted to determine the changes in structural damping due to various parametric effects. The 33-ft straight sections of piping were supported at the ends. Additionally, intermediate supports comprising spring, rod, and constant-force hangers, as well as a sway brace and snubbers, were used. Excitation was provided by low-force-level hammer impacts, a hydraulic shaker, and a 50-ton overhead crane for snapback testing. Data was recorded using acceleration, strain, and displacement time histories. This report presents test results showing the effect of stress level and type of supports on structural damping in piping.

  10. U.S. Army Energy and Environmental Requirements and Goals: Opportunities for Fuel Cells and Hydrogen- Facility Locations and Hydrogen Storage/Delivery Logistics

    Broader source: Energy.gov [DOE]

    Overview of DoD Energy Use, Federal Facilities Goals and Requirements, Federal Vehicles and Fuel Goals, Opportunities & Conclusions

  11. State Renewable Energy Requirements and Goals: Update Through 2003 (released in AEO2005)

    Reports and Publications (EIA)

    2005-01-01

    As of the end of 2003, 15 states had legislated programs to encourage the development of renewable energy for electricity generation. Of the 17 programs (two states have multiple programs), 9 are renewable portfolio standards (RPS), 4 are renewable energy mandates, and 4 are renewable energy goals.

  12. EM Reports Success in Drive to Meet DOE Fleet Reduction Goals

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. EM is on pace to meet the first of a series of goals to reduce its vehicle fleet and help DOE accomplish a broader initiative to cut greenhouse gas emissions and decrease petroleum consumption across the complex.

  13. Economic Performance

    Energy Savers [EERE]

    in Environmental, Energy, and Economic Performance ... of greenhouse gas emissions a priority for Federal agencies, it is hereby ordered as follows: Section 1. Policy. ...

  14. Performance Characterization

    Broader source: Energy.gov [DOE]

    Performance characterization efforts within the SunShot Systems Integration activities focus on collaborations with U.S. solar companies to:

  15. FY 2015 Annual Performance Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Performance Reports » FY 2015 Annual Performance Report FY 2015 Annual Performance Report DOE's FY 2015 Annual Performance Report (APR) presents the performance results for fiscal year 2015 that contributed to the achievement of goals identified in the President's fiscal year 2015 budget. The performance measures in this report were initially outlined in the Department's FY 2015 Congressional Budget Request. After final congressional budget negotiations, some performance targets were

  16. FY 2010 Annual Performance Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Performance Reports » FY 2010 Annual Performance Report FY 2010 Annual Performance Report Department of Energy's Annual Performance Report (APR) compares the Department's performance results for fiscal year 2010 with goals set in the President's fiscal year 2010 budget. The performance measures discussed in this report were outlined in the Department's congressional budget justifications and carried through the actual execution of the budget during the fiscal year. Performance

  17. FY 2011 Annual Performance Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Performance Reports » FY 2011 Annual Performance Report FY 2011 Annual Performance Report DOE's FY 2011 Annual Performance Report (APR) presents the performance results for fiscal year 2011 that contributed to the achievement of goals identified in the President's fiscal year 2011 budget. The performance measures in this report were initially outlined in the Department's FY 2011 Congressional Budget Request. After final congressional budget negotiations, some performance targets were revised to

  18. FY 2014 Annual Performance Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Performance Reports » FY 2014 Annual Performance Report FY 2014 Annual Performance Report DOE's FY 2014 Annual Performance Report (APR) presents the performance results for fiscal year 2014 that contributed to the achievement of goals identified in the President's fiscal year 2014 budget. The performance measures in this report were initially outlined in the Department's FY 2014 Congressional Budget Request. After final congressional budget negotiations, some performance targets were

  19. Measuring environmental performance

    SciTech Connect (OSTI)

    Weireter, R.

    1995-12-01

    Environmental management has become increasingly complex as regulatory and social forces transform traditional business practices. In recent years, due to the growing importance and cost of environmental management, emphasis has shifted away from regulatory compliance toward the broader areas of strategic environment management and total quality environmental management. This shift in emphasis has sought to incorporate environmental management throughout the entire company, rather than confine it to the {open_quotes}environmental department.{close_quotes} This shift has produced a need to measure environmental performance so that business managers can make more informed decisions regarding appropriate management strategies. Identifying appropriate measurement indicators and incorporating this goal into traditional company management information systems has become a key challenge for many environmental professionals. The objective of the presentation will be to discuss tools which can be used to measure a company`s environmental performance, and how these tools can help managers promote more cost-effective environmental management. The presentation will contain a general overview of the issues involved in establishing an environmental performance measurement system. Topics to be addressed include environmental management information systems, developing effective environmental programs, benchmarking your current status against which to evaluate future performance, and striving for continuous environmental improvement.

  20. River Protection Project waste feed delivery program technical performance measurement assessment plan

    SciTech Connect (OSTI)

    O'TOOLE, S.M.

    1999-09-30

    This plan establishes a formal technical performance-monitoring program. Technical performance is assessed by establishing requirements based performance goals at the beginning of a program and routinely evaluating progress in meeting these goals at predetermined milestones throughout the project life cycle.

  1. Government Performance and Results Act: Performance plan FY 1999, U.S. Nuclear Regulatory Commission. Volume 1

    SciTech Connect (OSTI)

    Fuches, J.L.

    1998-02-01

    The Nuclear Regulatory Commission`s (NRC) strategic plan [NUREG-1614, Vol. 1, September 1997] establishes a strategic framework that will guide future decision-making and will help the NRC continue to meet its responsibility for protecting public health and safety, promoting the common defense and security, and protecting the environment. This performance plan complements the agency`s strategic plan by setting annual goals with measurable target levels of performance for FY 1999, as required by the Government Performance and Results Act. No significant contribution was made to the preparation of the performance plan by any non-Federal entity. However, a contractor was used to help facilitate discussions and resolution of issues. Within six months after the close of FY 1999, the NRC will submit to the President and the Congress a report on program performance for FY 1999. This performance report will review the success of the agency in achieving the performance goals established for FY 1999. Where those goals have been achieved, the underlying assumptions and strategies will be examined to ensure that continued applicability is warranted in the future. If any of the FY 1999 performance goals are not met, the agency will conduct a thorough analysis of why it did not meet the goal and the actions necessary to meet-the goal in the future. One result of this analysis will be the documentation of plans and schedules for achieving the established performance goal. If the analysis should indicate that the performance goal is impractical or infeasible, the performance report will document why that is the case and what action is recommended.

  2. Optimizing Performance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Optimizing Performance Optimizing Performance Storage Optimization Optimizing the sizes of the files you store in HPSS and minimizing the number of tapes they are on will lead to the most effient use of NERSC HPSS: File sizes of about 1 GB or larger will give the best network performance (see graph below) Files sizes greater than about 500 GB can be more difficult to work with and lead to longer transfer times. Files larger than 15 TB cannot be uploaded to HPSS. Aggregate groups of small files

  3. RSF Workshop Session I: Energy Goals and Features of the RSF

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    I: Energy Goals and Features of the RSF Moderator: Bill Glover Panelists: Tom Hootman John Andary Shanti Pless ARCHITECTURAL PERSPECTIVE Tom Hootman, AIA, LEED AP BD+C RNL, Director of Sustainability ARCHITECTURE +ENERGY ARCHITECTURE +SUSTAINABILITY STRATEGIES RESULTS APPROACH CLIMATE PROGRAM SITE 60 FEET Research Support Facility Campus Site Plan n FTLB SERF S+TF Visitors Center n Floor Plans Level 1 Level 2 Level 3 Level 4 ENERGY +FORM RSF Evil Twin vs. 60' Wide Wings 150' Wide FOOTPRINT

  4. High-resolution Soft-RIXS: Scientific Goals and Technical Challenges |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Stanford Synchrotron Radiation Lightsource High-resolution Soft-RIXS: Scientific Goals and Technical Challenges Tuesday, November 22, 2011 - 3:30pm SSRL Conference Room 137-322 Giacomo Ghiringhelli, CNR/SPIN and Dipartimento di Fisica, Politecnico di Milano, Italy Visiting scholar at SIMES-Department of physics, Stanford University The interest in resonant inelastic soft x-ray scattering has been recently boosted mainly by results on high Tc superconductors and other cuprates, where orbital

  5. Renewable Portfolio Standards in the States: Balancing Goals and Implementation Strategies

    SciTech Connect (OSTI)

    Cory, K. S.; Swezey, B. G.

    2007-12-01

    This paper reports on renewable portfolio standards (RPS) and how the RPS rules vary from state to state. This variation presents important challenges to successful implementation. Key issues are discussed in terms of resource availability, solar-specific provisions, and political and regulatory consistency, and their impacts on the ability to finance new renewable energy projects. This report emphasizes the fact that a successful RPS policy must balance a state's goals for fuel diversity, economic development, price effects, and environmental benefits.

  6. U.S. Department of Energy Launches Real World Design Challenge: Goal of New

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Competition Is to Inspire High School Students to Study Engineering | U.S. DOE Office of Science (SC) U.S. Department of Energy Launches Real World Design Challenge: Goal of New Competition Is to Inspire High School Students to Study Engineering News News Home Featured Articles Science Headlines 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 Science Highlights Presentations & Testimony News Archives Communications and Public Affairs Contact Information Office of Science U.S.

  7. Estimated Chemical Warfare Agent Surface Clearance Goals for Remediation Pre-Planning

    SciTech Connect (OSTI)

    Dolislager, Frederick; Bansleben, Dr. Donald; Watson, Annetta Paule

    2010-01-01

    Health-based surface clearance goals, in units of mg/cm2, have been developed for the persistent chemical warfare agents sulfur mustard (HD) and nerve agent VX as well as their principal degradation products. Selection of model parameters and critical receptor (toddler child) allow calculation of surface residue estimates protective for the toddler child, the general population and adult employees of a facilty that has undergone chemical warfare agent attack.

  8. DOE/SC-ARM-12-010 Science Goals for the ARM Recovery Act Radars

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 Science Goals for the ARM Recovery Act Radars JH Mather May 2012 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned

  9. Agent-Based Modleing of Power Plants Placement to Evaluate the Clean Energy Standard Goal

    SciTech Connect (OSTI)

    Omitaomu, Olufemi A

    2014-01-01

    There is a political push for utilities to supply a specified share of their electricity sales from clean energy resources under the clean energy standard (CES). The goal is to achieve 80% clean energy by 2035. However, there are uncertainties about the ability of the utility industry to ramp up quickly even with the incentives that will be provided. Water availability from the streams is one of the major factors. The contiguous United States is divided into eighteen water regions, and multiple states share water from a single water region. Consequently, water usage decisions made in one state (located upstream of a water region that crosses multiple states) will greatly impact what is available downstream in another state. In this paper, an agent-based modeling approach is proposed to evaluate the clean energy standard goal for water-dependent energy resources. Specifically, using a water region rather than a state boundary as a bounding envelope for the modeling and starting at the headwaters, virtual power plants are placed based on the conditions that there is: (i) suitable land to site a particular power plant, (ii) enough water that meet regulatory guidelines within 20 miles of the suitable land, and (iii) a 20-mile buffer zone from an existing or a virtual power plant. The results obtained are discussed in the context of the proposed clean energy standard goal for states that overlap with one water region.

  10. Performance Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance assessment (PA) is defined in the United States by the Environmental Protection Agency (EPA) and the Nuclear Regulatory Commission (NRC) regulations as a process to be used in estimating the long-term performance of deep geologic disposal sites for high-level and transuranic radioactive waste. Although specific regulatory requirements differ for individual projects (e.g., the Waste Isolation Pilot Plant and the potential repository at Yucca Mountain), the overall approach to PA is

  11. Performance Period

    Office of Environmental Management (EM)

    Reactive Barrier: Cotter Corporation's Cañon City, Colorado, Uranium Mill | Department of Energy Assessment and Recommendations for Rejuvenation of a Permeable Reactive Barrier: Cotter Corporation's Cañon City, Colorado, Uranium Mill Performance Assessment and Recommendations for Rejuvenation of a Permeable Reactive Barrier: Cotter Corporation's Cañon City, Colorado, Uranium Mill Performance Assessment and Recommendations for Rejuvenation of a Permeable Reactive Barrier: Cotter

  12. FY 2009 Annual Performance Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Performance Reports » FY 2009 Annual Performance Report FY 2009 Annual Performance Report DOE's Annual Performance Report (APR) outlines the Department's performance in fiscal year 2009 against the goals that were set in the President's fiscal year 2009 budget. The performance measures discussed in this report were outlined in the Department's congressional budget justifications and carried through the actual execution of the budget during the fiscal year. Because these measures were

  13. Evaluation of Proposed Hampton Roads Area Sites for Using Small Modular Reactors to Support Federal Clean Energy Goals

    Broader source: Energy.gov [DOE]

    Evaluation of Proposed Hampton Roads Area Sites for Using Small Modular Reactors to Support Federal Clean Energy Goals ORNL/LTR-2014/155 April 2014

  14. Evaluation of Potential Locations for Siting Small Modular Reactors near Federal Energy Clusters to Support Federal Clean Energy Goals

    Broader source: Energy.gov [DOE]

    Evaluation of Potential Locations for Siting Small Modular Reactors near Federal Energy Clusters to Support Federal Clean Energy Goals ORNL/TM-2014/433 September 2014

  15. Building America Roadmap to High Performance Homes | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Roadmap to High Performance Homes Building America Roadmap to High Performance Homes This presentation was delivered at the U.S. Department of Energy Building America Technical Update meeting on April 29-30, 2013, in Denver, Colorado. PDF icon ba_roadmap_highperformance_werling.pdf More Documents & Publications Update on U.S. Department of Energy Building America Program Goals Update on U.S. Department of Energy Building America Program Goals Collective Impact for Zero Net Energy Homes

  16. Goal-oriented sensitivity analysis for lattice kinetic Monte Carlo simulations

    SciTech Connect (OSTI)

    Arampatzis, Georgios; Department of Mathematics and Statistics, University of Massachusetts, Amherst, Massachusetts 01003 ; Katsoulakis, Markos A.

    2014-03-28

    In this paper we propose a new class of coupling methods for the sensitivity analysis of high dimensional stochastic systems and in particular for lattice Kinetic Monte Carlo (KMC). Sensitivity analysis for stochastic systems is typically based on approximating continuous derivatives with respect to model parameters by the mean value of samples from a finite difference scheme. Instead of using independent samples the proposed algorithm reduces the variance of the estimator by developing a strongly correlated-coupled- stochastic process for both the perturbed and unperturbed stochastic processes, defined in a common state space. The novelty of our construction is that the new coupled process depends on the targeted observables, e.g., coverage, Hamiltonian, spatial correlations, surface roughness, etc., hence we refer to the proposed method as goal-oriented sensitivity analysis. In particular, the rates of the coupled Continuous Time Markov Chain are obtained as solutions to a goal-oriented optimization problem, depending on the observable of interest, by considering the minimization functional of the corresponding variance. We show that this functional can be used as a diagnostic tool for the design and evaluation of different classes of couplings. Furthermore, the resulting KMC sensitivity algorithm has an easy implementation that is based on the BortzKalosLebowitz algorithm's philosophy, where events are divided in classes depending on level sets of the observable of interest. Finally, we demonstrate in several examples including adsorption, desorption, and diffusion Kinetic Monte Carlo that for the same confidence interval and observable, the proposed goal-oriented algorithm can be two orders of magnitude faster than existing coupling algorithms for spatial KMC such as the Common Random Number approach. We also provide a complete implementation of the proposed sensitivity analysis algorithms, including various spatial KMC examples, in a supplementary MATLAB source code.

  17. State Renewable Energy Requirements and Goals: Update Through 2007 (Update) (released in AEO2008)

    Reports and Publications (EIA)

    2008-01-01

    In recent years, the Annual Energy Outlook (AEO) has tracked the growing number of states that have adopted requirements or goals for renewable energy. While there is no federal renewable generation mandate, the states have been adopting such standards for some time. AEO2005 provided a summary of all existing programs in effect at that time, and subsequent AEOs have examined new policies or changes to existing ones. Since the publication of AEO2007, four states have enacted new renewable portfolio standards (RPS) legislation, and five others have strengthened their existing RPS programs. In total, 25 states and the District of Columbia.

  18. Promoting India's development: energy security and climate security are convergent goals

    SciTech Connect (OSTI)

    Rajan, Gupta; Shankar, Harihar; Joshi, Sunjoy

    2009-01-01

    This paper investigates three aspects of the energy-climate challenges faced by India. First, we examine energy security in light of anticipated growth in power generation in response to the national goal of maintaining close to 10% growth in GDP. Second, we examine possible options for mitigation and adaptation to climate change for India that it can take to the coming Copenhagen meeting on climate change. Lastly, we introduce an open web based tool for analyzing and planning global energy systems called the Global Energy Observatory (GEO).

  19. USVI Makes Headway Toward Goal to Reduce Fossil Fuel 60% by 2025

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Oil prices spike to over $145/ barrel and price of electricity exceeds $0.50/kWh in U.S. Virgin Islands (USVI) USVI announces goal to reduce fossil fuel use 60% by 2025 In 3rd most active hurricane season on record, Earl hits USVI Virgin Islands Energy O ce (VIEO) launches Sun Power Loan Program WAPA installs waste heat recovery plant, adding 19 MW of power without burning a single drop of additional oil VIEO awards nearly $1 million to USVI nonpro ts for energy e ciency and renewable energy

  20. PORTFOLIO PERFORMANCE

    Broader source: Energy.gov [DOE]

    NOTE FROM THE EXECUTIVE DIRECTOR The U.S. Department of Energy’s Loan Programs Oce (LPO) provides the critical financing needed to deploy some of the world’s largest and most innovative clean energy and advanced technology vehicle manufacturing projects to date. Despite its mission to help finance innovation, which carries some degree of financial risk, LPO has maintained strong financial performance, even when compared with private financing of conventional energy projects in the United States. As of September 2014, more than $810 million of interest has already been earned and the estimated loss ratio on LPO’s portfolio is approximately 2% of LPO’s total commitments. This strong performance demonstrates our commitment to protecting taxpayer interests while helping deploy the innovative energy technology necessary to make the United States a global leader in clean energy.

  1. Improving the Quality of Alerts and Predicting Intruder's Next Goal with Hidden Colored Petri-Net

    SciTech Connect (OSTI)

    Yu, Dong; Frincke, Deb A.

    2006-06-22

    Intrusion detection systems (IDS) often provide poor quality alerts, which are insufficient to support rapid identification of ongoing attacks or predict an intruder’s next likely goal. In this paper, we propose a novel approach to alert post-processing and correlation, the Hidden Colored Petri-Net (HCPN). Different from most other alert correlation methods, our approach treats the alert correlation problem as an inference problem rather than a filter problem. Our approach assumes that the intruder’s actions are unknown to the IDS and can be inferred only from the alerts generated by the IDS sensors. HCPN can describe the relationship between different steps carried out by intruders, model observations (alerts) and transitions (actions) separately, and associate each token element (system state) with a probability (or confidence). The model is an extension to Colored Petri-Net (CPN) .It is so called “hidden” because the transitions (actions) are not directly observable but can be inferred by looking through the observations (alerts). These features make HCPN especially suitable for discovering intruders’ actions from their partial observations (alerts,) and predicting intruders’ next goal. Our experiments on DARPA evaluation datasets and the attack scenarios from the Grand Challenge Problem (GCP) show that HCPN has promise as a way to reducing false positives and negatives, predicting intruder’s next possible action, uncovering intruders’ intrusion strategies after the attack scenario has happened, and providing confidence scores.

  2. Superconducting Resonators Development for the FRIB and ReA Linacs at MSU: Recent Achievements and Future Goals

    SciTech Connect (OSTI)

    Facco, A; Binkowski, J; Compton, C; Crisp, J L; Dubbs, L J; Elliot, K; Harle, L L; Hodek, M; Johnson, M J; Leitner, D; Leitner, M; Malloch, I M; Miller, S J; Oweiss, R; Popielarski, J; Popielarski, L; Saito, K; Wei, J; Wlodarczak, J; Xu, Y; Zhang, Y; Zheng, Z; Burrill, A; Davis, G K; Macha, K

    2012-07-01

    The superconducting driver and post-accelerator linacs of the FRIB project, the large scale radioactive beam facility under construction at MSU, require the construction of about 400 low-{beta} Quarter-wave (QWR) and Half-wave resonators (HWR) with four different optimum velocities. 1st and 2nd generation prototypes of {beta}{sub 0} = 0.041 and 0.085 QWRs and {beta}{sub 0} = 0.53 HWRs have been built and tested, and have more than fulfilled the FRIB and ReA design goals. The present cavity surface preparation at MSU allowed production of low-{beta} cavities nearly free from field emission. The first two cryostats of {beta}{sub 0} = 0.041 QWRs are now in operation in the ReA3 linac. A 3rd generation design of the FRIB resonators allowed to further improve the cavity parameters, reducing the peak magnetic field in operation and increasing the possible operation gradient, with consequent reduction of the number of required resonators. The construction of the cavities for FRIB, which includes three phases for each cavity type (development, pre-production and production runs) has started. Cavity design, construction, treatment and performance will be described and discussed.

  3. Grid Performance and Reliability | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Systems Integration » Grid Performance and Reliability Grid Performance and Reliability 2 way power flow orange2.png As the solar industry moves towards achieving the SunShot Initiative goals, the electric power system must evolve to handle large-scale changes in transmission and distribution (T&D) planning and operations in order to accommodate increasing penetrations of distributed PV systems. Effectively interconnecting variable PV generation requires forward thinking and dynamic

  4. Office Inspector General DOE Annual Performance Report FY 2008, Annual

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Performance Plan FY 2009 | Department of Energy Inspector General DOE Annual Performance Report FY 2008, Annual Performance Plan FY 2009 Office Inspector General DOE Annual Performance Report FY 2008, Annual Performance Plan FY 2009 During Fiscal Year (FY) 2008, we reviewed a variety of critical areas relevant to the Department's mission priorities. One of our goals, for example, was to examine possible programmatic improvements in Department operations relating to cyber security and

  5. FY 2007 Annual Performance Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 Annual Performance Report FY 2007 Annual Performance Report Outlines the Department's performance in fiscal year 2007 against the goals set out in the President's proposed fiscal year 2007 budget. The metrics discussed in this report were outlined in the Department's congressional budget justifications and carried through the actual execution of the budget during the fiscal year. PDF icon FY 2007 Annual Performance Report More Documents & Publications FY 2008 Annual Performance Report FY

  6. FY 2008 Annual Performance Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Performance Reports » FY 2008 Annual Performance Report FY 2008 Annual Performance Report Outlines the Department's performance in fiscal year 2008 against the goals set out in the President's proposed fiscal year 2008 budget. The metrics discussed in this report were outlined in the Department's congressional budget justifications and carried through the actual execution of the budget during the fiscal year. PDF icon FY 2008 Annual Performance Report More Documents & Publications FY

  7. Verification of EPA's ''Preliminary Remediation Goals for radionuclides'' (PRG) electronic calculator

    SciTech Connect (OSTI)

    Jannik, Tim; Stagich, Brooke

    2015-08-28

    The U.S. Environmental Protection Agency (EPA) requested an external, independent verification study of their updated “Preliminary Remediation Goals for Radionuclides” (PRG) electronic calculator. The calculator provides PRGs for radionuclides that are used as a screening tool at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and Resource Conservation and Recovery Act (RCRA) sites. These risk-based PRGs establish concentration limits under specific exposure scenarios. The purpose of this verification study is to determine that the calculator has no inherit numerical problems with obtaining solutions as well as to ensure that the equations are programmed correctly. There are 167 equations used in the calculator. To verify the calculator, all equations for each of seven receptor types (resident, construction worker, outdoor and indoor worker, recreator, farmer, and composite worker) were hand calculated using the default parameters. The same four radionuclides (Am-241, Co-60, H-3, and Pu-238) were used for each calculation for consistency throughout.

  8. Identification of Selected Areas to Support Federal Clean Energy Goals Using Small Modular Reactors

    SciTech Connect (OSTI)

    Belles, Randy; Mays, Gary T; Omitaomu, Olufemi A; Poore III, Willis P

    2013-12-01

    This analysis identifies candidate locations, in a broad sense, where there are high concentrations of federal government agency use of electricity, which are also suitable areas for near-term SMRs. Near-term SMRs are based on light-water reactor (LWR) technology with compact design features that are expected to offer a host of safety, siting, construction, and economic benefits. These smaller plants are ideally suited for small electric grids and for locations that cannot support large reactors, thus providing utilities or governement entities with the flexibility to scale power production as demand changes by adding additional power by deploying more modules or reactors in phases. This research project is aimed at providing methodologies, information, and insights to assist the federal government in meeting federal clean energy goals.

  9. ASR - 2011 Performance Metrics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    climate modeling within BER CESD. The goal of the climate modeling program is the development of climate models that include natural and human systems, which will project...

  10. EM Recovery Act Performance

    Broader source: Energy.gov [DOE]

    The Office of Environmental Management's (EM) American Recovery and Reinvestment Act Program recently achieved 74 percent footprint reduction, exceeding the originally established goal of 40...

  11. Combined Fiscal Year (FY) 2002 Annual Performance Report and FY 2003 Annual

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Performance Plan | Department of Energy 2 Annual Performance Report and FY 2003 Annual Performance Plan Combined Fiscal Year (FY) 2002 Annual Performance Report and FY 2003 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2002 actual performance and FY 2003 planned activities. PDF icon Combined Fiscal Year (FY) 2002 Annual Performance Report and FY 2003 Annual Performance Plan More Documents & Publications Annual Performance

  12. TAP Webinar- Partnering For Success: How to Work with Economic Development/ Public Finance Authorities to Meet Your Clean Energy Goals

    Broader source: Energy.gov [DOE]

    This webinar is an opportunity to learn how to find and work with resources in your community to help access financial expertise, connect with resources in your community and make connections that can help you meet your clean energy goals.

  13. Performance Engineering Research Center and RECOVERY. Performance...

    Office of Scientific and Technical Information (OSTI)

    Performance Engineering Research Center and RECOVERY. Performance Engineering Research Institution SciDAC-e Augmentation. Performance enhancement Citation Details In-Document ...

  14. FY 2006 Performance and Accountability Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 Performance and Accountability Report FY 2006 Performance and Accountability Report Outlines the Department's performance in fiscal year 2006 against the goals set out in the President's proposed fiscal year 2006 budget. The metrics discussed in this report were outlined in the Department's congressional budget justifications and carried through the actual execution of the budget during the fiscal year PDF icon FY 2006 Performance and Accountability Report More Documents & Publications FY

  15. Technology Performance Exchange - 2014 BTO Peer Review | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Technology Performance Exchange - 2014 BTO Peer Review Technology Performance Exchange - 2014 BTO Peer Review Project Objective This project's overall goal is to ensure that necessary energy performance data is easily accessible for a broad array of technologies to reduce investment risk and drive uptake of cost-effective efficiency measures. The objectives of this project include defining the characteristics necessary to credibly predict energy performance, and creating the

  16. Combined Fiscal Year (FY) 2006 Annual Performance Results and FY 2007

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Performance Plan | Department of Energy 6 Annual Performance Results and FY 2007 Annual Performance Plan Combined Fiscal Year (FY) 2006 Annual Performance Results and FY 2007 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2006 Annual Performance Results and FY 2007 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2006 actual performance and FY 2007 planned activities. PDF icon

  17. Combined Fiscal Year (FY) 2007 Annual Performance Results and FY 2008

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Performance Plan | Department of Energy 7 Annual Performance Results and FY 2008 Annual Performance Plan Combined Fiscal Year (FY) 2007 Annual Performance Results and FY 2008 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2007 Annual Performance Results and FY 2008 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2007 actual performance and FY 2008 planned activities. PDF icon

  18. Combined Fiscal Year (FY) 2009 Annual Performance Results and FY 2010

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Performance Plan | Department of Energy 9 Annual Performance Results and FY 2010 Annual Performance Plan Combined Fiscal Year (FY) 2009 Annual Performance Results and FY 2010 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2009 Annual Performance Results and FY 2010 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2009 actual performance and FY 2010 planned activities. PDF icon

  19. Combined Fiscal Year (FY) 2010 Annual Performance Results and FY 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Performance Plan | Department of Energy 0 Annual Performance Results and FY 2011 Annual Performance Plan Combined Fiscal Year (FY) 2010 Annual Performance Results and FY 2011 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2010 Annual Performance Results and FY 2011 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2010 actual performance and FY 2011 planned activities. PDF icon

  20. Combined Fiscal Year (FY) 2011 Annual Performance Results and FY 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Performance Plan | Department of Energy 1 Annual Performance Results and FY 2012 Annual Performance Plan Combined Fiscal Year (FY) 2011 Annual Performance Results and FY 2012 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2011 Annual Performance Results and FY 2012 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2011 actual performance and FY 2012 planned activities. PDF icon

  1. Combined Fiscal Year (FY) 2012 Annual Performance Results and FYs 2013 and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2014 Annual Performance Plan | Department of Energy 2 Annual Performance Results and FYs 2013 and 2014 Annual Performance Plan Combined Fiscal Year (FY) 2012 Annual Performance Results and FYs 2013 and 2014 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2012 Annual Performance Results and FYs 2013 and 2014 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2012 actual performance and FYs 2013

  2. Combined Fiscal Year (FY) 2013 Annual Performance Results and FYs 2014 and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2015 Annual Performance Plan | Department of Energy 3 Annual Performance Results and FYs 2014 and 2015 Annual Performance Plan Combined Fiscal Year (FY) 2013 Annual Performance Results and FYs 2014 and 2015 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2013 Annual Performance Results and FYs 2014 and 2015 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2013 actual performance and FYs 2014

  3. Combined Fiscal Year (FY) 2014 Annual Performance Results and FYs 2015 and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2016 Annual Performance Plan | Department of Energy 4 Annual Performance Results and FYs 2015 and 2016 Annual Performance Plan Combined Fiscal Year (FY) 2014 Annual Performance Results and FYs 2015 and 2016 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2014 Annual Performance Results and FYs 2015 and 2016 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2014 actual performance and FYs 2015

  4. CEBAF Upgrade: Cryomodule Performance And Lessons Learned

    SciTech Connect (OSTI)

    Drury, Michael A.; Davis, G. Kirk; Hogan, John P.; Hovater, J. Curt; King, Lawrence; Marhauser, Frank; Park, HyeKyoung; Preble, Joe; Reece, Charles E.; Rimmer, Robert A.; Wang, Haipeng; Wiseman, Mark A.

    2014-02-01

    The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the 12 GeV Upgrade is a doubling of the available beam energy of the Continuous Electron Beam Accelerator Facility (CEBAF) from 6 GeV to 12 GeV. This increase in beam energy will be due in large part to the addition of ten C100 cryomodules plus associated new RF in the CEBAF linacs. The C100 cryomodules are designed to deliver 100 MeV per installed cryomodule. Each C100 cryomodule is built around a string of eight seven-cell, electro-polished, superconducting RF cavities. While an average performance of 100MV per cryomodule is needed to achieve the overall 12 GeV beam energy goal, the actual performance goal for the cryomodules is an average energy gain of 108 MV to provide operational headroom. Cryomodule production started in December 2010. All ten of the C100 cryomodules are installed in the linac tunnels and are on schedule to complete commissioning by September 2013. Performance during Commissioning has ranged from 104 MV to 118 MV. In May, 2012 a test of an early C100 achieved 108 MV with full beam loading. This paper will discuss the performance of the C100 cryomodules along with operational challenges and lessons learned for future designs.

  5. Connecting Performance Analysis and Visualization to Advance Extreme Scale Computing

    SciTech Connect (OSTI)

    Bremer, Peer-Timo; Mohr, Bernd; Schulz, Martin; Pasccci, Valerio; Gamblin, Todd; Brunst, Holger

    2015-07-29

    The characterization, modeling, analysis, and tuning of software performance has been a central topic in High Performance Computing (HPC) since its early beginnings. The overall goal is to make HPC software run faster on particular hardware, either through better scheduling, on-node resource utilization, or more efficient distributed communication.

  6. High-performance commercial building facades

    SciTech Connect (OSTI)

    Lee, Eleanor; Selkowitz, Stephen; Bazjanac, Vladimir; Inkarojrit, Vorapat; Kohler, Christian

    2002-06-01

    This study focuses on advanced building facades that use daylighting, sun control, ventilation systems, and dynamic systems. A quick perusal of the leading architectural magazines, or a discussion in most architectural firms today will eventually lead to mention of some of the innovative new buildings that are being constructed with all-glass facades. Most of these buildings are appearing in Europe, although interestingly U.S. A/E firms often have a leading role in their design. This ''emerging technology'' of heavily glazed fagades is often associated with buildings whose design goals include energy efficiency, sustainability, and a ''green'' image. While there are a number of new books on the subject with impressive photos and drawings, there is little critical examination of the actual performance of such buildings, and a generally poor understanding as to whether they achieve their performance goals, or even what those goals might be. Even if the building ''works'' it is often dangerous to take a design solution from one climate and location and transport it to a new one without a good causal understanding of how the systems work. In addition, there is a wide range of existing and emerging glazing and fenestration technologies in use in these buildings, many of which break new ground with respect to innovative structural use of glass. It is unclear as to how well many of these designs would work as currently formulated in California locations dominated by intense sunlight and seismic events. Finally, the costs of these systems are higher than normal facades, but claims of energy and productivity savings are used to justify some of them. Once again these claims, while plausible, are largely unsupported. There have been major advances in glazing and facade technology over the past 30 years and we expect to see continued innovation and product development. It is critical in this process to be able to understand which performance goals are being met by current technology and design solutions, and which ones need further development and refinement. The primary goal of this study is to clarify the state-of-the-art of the performance of advanced building facades so that California building owners and designers can make informed decisions as to the value of these building concepts in meeting design goals for energy efficiency, ventilation, productivity and sustainability.

  7. ReEDS Modeling of the President’s 2020 U.S. Renewable Electricity Generation Goal

    Broader source: Energy.gov [DOE]

    The primary objective of the analysis is to project future contributions from wind, solar, and geothermal technologies to the U.S. electricity generation mix in the 2020 time period. While this exercise is motivated by an interest in assessing the feasibility of achieving the Obama's Administration's goal of doubling renewable generation during that timeframe, the analysis only evaluates one interpretation of the goal and does not comprehensively evaluate others. The report introduction provides further background for this motivation. The analysis presented in this report was requested by the Office of Energy Efficiency and Renewable Energy in the U.S. Department of Energy.

  8. Performance and Optimization

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Optimization Performance and Optimization Performance Monitoring Last edited: 2012-01-09 12:31:03...

  9. Performance and Optimization

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Optimization Performance and Optimization Performance Monitoring Last edited: 2012-01-09 12:31:03

  10. Results of Performance Tests Performed on the John Watts Casing Connection on 7" Pipe

    SciTech Connect (OSTI)

    John D. Watts

    1999-08-01

    Stress Engineering Services (SES) was contracted by Mr. John Watts to test his threaded connection developed for oilfield oil and gas service. This particular test required the application of a variety of loads including axial tension and compression, internal pressure (gas), external pressure (water), bending and both low and elevated temperature. These loads were used to determine the sealing and structural limits of the connection. The connection design tested had tapered threads with 10 threads per inch. A square thread form and a round thread form were tested. The square thread form had a 2{sup o} load flank and 15{sup o} stab flank. The round thread had a 0{sup o} load flank and 20{sup o} stab flank. Most of the testing was performed on the round thread form. Both a coupled connection design and an integral connection design were tested. The coupling was a pin by pin (male) thread, with the pipe having a box (female) thread. Both designs have outside and inside diameters that are flush with the pipe body. Both designs also contain a small external shoulder. The test procedure selected for this evaluation was the newly written ISO 13679 procedure for full scale testing of casing and tubing connections. The ISO procedure requires a variety of tests that includes makeup/breakout testing, internal gas sealability/external water sealability testing with axial tension, axial compression, bending, internal gas thermal cycle tests and limit load (failure) tests. This test was performed with four coupled samples and included most of these loads. Two integral samples were also included for limit load testing ISO makeup/breakout tests are divided into three types--initial makeup, IML1, repeated makeup within the same sample, MBL, and repeated makeup using several samples called round robin, RR. IMU and MBL were performed in this project. The ISO sealing and structural procedure is divided into four primary tests and identified as Series A, B, C and Limit Load (failure). Series A and B test to 95% actual yield of the pipe and Series C uses 90% of actual yield. Samples 1 and 3 were tested to Series A and the loads are shown in Figure 1. For these samples, the axial compression was limited to 75% pipe body yield, which was set by Mr. Watts at the beginning of the test. Samples 2 and 4 were tested to Series B with loads shown in Figure 2. This series included 20 degrees per 100 feet bending but no external pressure. Due to premature leaks, no samples were subjected to Series C which included mechanical and thermal cycles. Samples 5 and 6 were tested to failure. The project started with the selection and purchase of a popular size of oilfield pipe, which was 7-inch OD, 32 pound per foot, P-110 casing. While the connections were being threaded, material tensile tests were performed to get the actual strength of the 7-inch pipe. The first samples contained a square thread form. Excessive galling was experienced during the first series of makeup/breakout tests and Mr. Watts decided to change the thread form and remachine the samples. The second samples had a round thread form and performed very well in the makeup/breakout tests. Basically no galling occurred of any consequence. Samples 1 and 3 were to be tested with external water (ISO Series A) while samples 2 and 4 were to be tested with bending (ISO Series B, no external pressure). Testing of all four samples started with tension and internal gas pressure. During this initial pressure testing, samples 1, 3 and 4 developed leaks and the test was stopped before any external pressure or bending was applied. Sample 2 successfully tested to ISO Load Point 5 which included bending before developing a leak. Figure 3 shows the loads at which the samples leaked and the relative pipe body performance capability. Sample 1 and end A of sample 2 held a high pressure while samples 3, 4 and end B of sample 2 leaked at relatively low pressures. All of these leaks were with nitrogen gas pressure. After reviewing the results, it was believed that several conditions may have contributed to the prema

  11. High Performance Walls in Hot-Dry Climates

    SciTech Connect (OSTI)

    Hoeschele, M.; Springer, D.; Dakin, B.; German, A.

    2015-01-01

    High performance walls represent a high priority measure for moving the next generation of new homes to the Zero Net Energy performance level. The primary goal in improving wall thermal performance revolves around increasing the wall framing from 2x4 to 2x6, adding more cavity and exterior rigid insulation, achieving insulation installation criteria meeting ENERGY STAR's thermal bypass checklist, and reducing the amount of wood penetrating the wall cavity.

  12. Goal-based angular adaptivity applied to a wavelet-based discretisation of the neutral particle transport equation

    SciTech Connect (OSTI)

    Goffin, Mark A.; Buchan, Andrew G.; Dargaville, Steven; Pain, Christopher C.; Smith, Paul N.; Smedley-Stevenson, Richard P.

    2015-01-15

    A method for applying goal-based adaptive methods to the angular resolution of the neutral particle transport equation is presented. The methods are applied to an octahedral wavelet discretisation of the spherical angular domain which allows for anisotropic resolution. The angular resolution is adapted across both the spatial and energy dimensions. The spatial domain is discretised using an inner-element sub-grid scale finite element method. The goal-based adaptive methods optimise the angular discretisation to minimise the error in a specific functional of the solution. The goal-based error estimators require the solution of an adjoint system to determine the importance to the specified functional. The error estimators and the novel methods to calculate them are described. Several examples are presented to demonstrate the effectiveness of the methods. It is shown that the methods can significantly reduce the number of unknowns and computational time required to obtain a given error. The novelty of the work is the use of goal-based adaptive methods to obtain anisotropic resolution in the angular domain for solving the transport equation. -- Highlights: •Wavelet angular discretisation used to solve transport equation. •Adaptive method developed for the wavelet discretisation. •Anisotropic angular resolution demonstrated through the adaptive method. •Adaptive method provides improvements in computational efficiency.

  13. High Performance and Sustainable Buildings Guidance

    Energy Savers [EERE]

    HIGH PERFORMANCE and SUSTAINABLE BUILDINGS GUIDANCE Final (12/1/08) PURPOSE The Interagency Sustainability Working Group (ISWG), as a subcommittee of the Steering Committee established by Executive Order (E.O.) 13423, initiated development of the following guidance to assist agencies in meeting the high performance and sustainable buildings goals of E.O. 13423, section 2(f). 1 E.O. 13423, sec. 2(f) states "In implementing the policy set forth in section 1 of this order, the head of each

  14. Optimization of Mud Hammer Drilling Performance--A Program to Benchmark the Viability of Advanced Mud Hammer Drilling

    SciTech Connect (OSTI)

    Arnis Judzis

    2006-03-01

    Operators continue to look for ways to improve hard rock drilling performance through emerging technologies. A consortium of Department of Energy, operator and industry participants put together an effort to test and optimize mud driven fluid hammers as one emerging technology that has shown promise to increase penetration rates in hard rock. The thrust of this program has been to test and record the performance of fluid hammers in full scale test conditions including, hard formations at simulated depth, high density/high solids drilling muds, and realistic fluid power levels. This paper details the testing and results of testing two 7 3/4 inch diameter mud hammers with 8 1/2 inch hammer bits. A Novatek MHN5 and an SDS Digger FH185 mud hammer were tested with several bit types, with performance being compared to a conventional (IADC Code 537) tricone bit. These tools functionally operated in all of the simulated downhole environments. The performance was in the range of the baseline ticone or better at lower borehole pressures, but at higher borehole pressures the performance was in the lower range or below that of the baseline tricone bit. A new drilling mode was observed, while operating the MHN5 mud hammer. This mode was noticed as the weight on bit (WOB) was in transition from low to high applied load. During this new ''transition drilling mode'', performance was substantially improved and in some cases outperformed the tricone bit. Improvements were noted for the SDS tool while drilling with a more aggressive bit design. Future work includes the optimization of these or the next generation tools for operating in higher density and higher borehole pressure conditions and improving bit design and technology based on the knowledge gained from this test program.

  15. Axis-1 diode simulations I: standard 2-inch cathode

    SciTech Connect (OSTI)

    Ekdahl, Carl [Los Alamos National Laboratory

    2011-01-11

    The standard configuration of the DARHT Axis-I diode features a 5.08-cm diameter velvet emitter mounted in the flat surface of the cathode shroud. The surface of the velvet is slightly recessed {approx}2.5 mm. This configuration produces a 1.75 kA beam when a 3.8-MV pulse is applied to the anode-cathode (AK) gap. This note addresses some of the physics of this diode through the use of finite-element simulations.

  16. Modelling of the thermal behaviour of 48 inch cylinders

    SciTech Connect (OSTI)

    Clayton, D.G.; Hayes, T.J.; Livesey, E.; Lomas, J.; Price, M.

    1991-12-31

    This paper describes the current state of the analytical models being developed by British Nuclear Fuels plc (BNFL) to improve the understanding of the response of Uranium Hexafluoride containers engulfed in a fire. Details are given of the modeling methods used and physical processes simulated, together with some predictions from the models. Explanations for the differences between the predictions are presented as well as an outline for future development of the models.

  17. Photo of the Week: Inside the 60-Inch Cyclotron | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sarah Gerrity Sarah Gerrity Former Multimedia Editor, Office of Public Affairs Every week, we'll feature our favorite energy-related photo here on Energy.gov, at Facebook.com...

  18. Development of a ten inch manipulators-based, flexible, broadband...

    Office of Scientific and Technical Information (OSTI)

    Authors: Steel, A. B., E-mail: steel1@llnl.gov ; Dunn, J. ; Emig, J. ; Beiersdorfer, P. ; Brown, G. V. ; Shepherd, R. ; Marley, E. V. 1 ; Hoarty, D. J. 2 + Show Author ...

  19. Strategy Guideline: Partnering for High Performance Homes

    SciTech Connect (OSTI)

    Prahl, D.

    2013-01-01

    High performance houses require a high degree of coordination and have significant interdependencies between various systems in order to perform properly, meet customer expectations, and minimize risks for the builder. Responsibility for the key performance attributes is shared across the project team and can be well coordinated through advanced partnering strategies. For high performance homes, traditional partnerships need to be matured to the next level and be expanded to all members of the project team including trades, suppliers, manufacturers, HERS raters, designers, architects, and building officials as appropriate. In an environment where the builder is the only source of communication between trades and consultants and where relationships are, in general, adversarial as opposed to cooperative, the chances of any one building system to fail are greater. Furthermore, it is much harder for the builder to identify and capitalize on synergistic opportunities. Partnering can help bridge the cross-functional aspects of the systems approach and achieve performance-based criteria. Critical success factors for partnering include support from top management, mutual trust, effective and open communication, effective coordination around common goals, team building, appropriate use of an outside facilitator, a partnering charter progress toward common goals, an effective problem-solving process, long-term commitment, continuous improvement, and a positive experience for all involved.

  20. Crushable structure performance determined from reconstructed dynamic forces during impact tests

    SciTech Connect (OSTI)

    Bateman, V.I.

    1995-01-01

    A force reconstruction technique has been used to assess the dynamic performance of a crushable structure (a bomb nose) in both the axial (90{degrees}) and slapdown (30{degrees}) impact conditions. The dynamic force characteristics for the nose design, determined from these test results, have been used to write a dynamic force specification for a new nose design that will replace the old nose. The dynamic forces are reconstructed from measured acceleration responses with the Sum of Weighted Accelerations Technique (SWAT) developed at Sandia National Laboratories. Axial characterizations for the old nose are presented from tests at two SNL facilities: a rocket rail launcher facility and an 18-Inch horizontal actuator facility. The characterizations for the old nose are compared to the characterizations for two new nose designs. Slapdown characterizations for the old nose are presented. Incorporation of the test results into a dynamic force specification is discussed.

  1. Performance and Optimization

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance and Optimization Performance and Optimization Benchmarking Software on Hopper and Carver PURPOSE Test the performance impact of multithreading with representative...

  2. Math Library Performance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Math Library Performance Math Library Performance Fully optimizing a given application's performance often requires a deep understanding of the source, an accurate profile for a ...

  3. Performance, power, and energy of in-situ and post-processing visualization

    SciTech Connect (OSTI)

    Adhinarayanan, Vignesh

    2015-10-05

    The goal of this project was to "study the performance, power, and energy trade-offs among traditional post-processing, modern post-processing, and in-situ visualization pipelines."

  4. ESPC Past Performance Questionnaire

    Broader source: Energy.gov [DOE]

    Document offers a series of questions to evaluate a contractor’s performance during an energy savings performance contract (ESPC).

  5. Contractor Past Performance Information

    Broader source: Energy.gov (indexed) [DOE]

    management controls and the compliance assessments of contractor performance information. Section IV has best practices to address contractor performance information....

  6. Evaluation of Potential Locations for Siting Small Modular Reactors near Federal Energy Clusters to Support Federal Clean Energy Goals

    SciTech Connect (OSTI)

    Belles, Randy J.; Omitaomu, Olufemi A.

    2014-09-01

    Geographic information systems (GIS) technology was applied to analyze federal energy demand across the contiguous US. Several federal energy clusters were previously identified, including Hampton Roads, Virginia, which was subsequently studied in detail. This study provides an analysis of three additional diverse federal energy clusters. The analysis shows that there are potential sites in various federal energy clusters that could be evaluated further for placement of an integral pressurized-water reactor (iPWR) to support meeting federal clean energy goals.

  7. Minimising the error in eigenvalue calculations involving the Boltzmann transport equation using goal-based adaptivity on unstructured meshes

    SciTech Connect (OSTI)

    Goffin, Mark A.; Baker, Christopher M.J.; Buchan, Andrew G.; Pain, Christopher C.; Eaton, Matthew D.; Smith, Paul N.

    2013-06-01

    This article presents a method for goal-based anisotropic adaptive methods for the finite element method applied to the Boltzmann transport equation. The neutron multiplication factor, k{sub eff}, is used as the goal of the adaptive procedure. The anisotropic adaptive algorithm requires error measures for k{sub eff} with directional dependence. General error estimators are derived for any given functional of the flux and applied to k{sub eff} to acquire the driving force for the adaptive procedure. The error estimators require the solution of an appropriately formed dual equation. Forward and dual error indicators are calculated by weighting the Hessian of each solution with the dual and forward residual respectively. The Hessian is used as an approximation of the interpolation error in the solution which gives rise to the directional dependence. The two indicators are combined to form a single error metric that is used to adapt the finite element mesh. The residual is approximated using a novel technique arising from the sub-grid scale finite element discretisation. Two adaptive routes are demonstrated: (i) a single mesh is used to solve all energy groups, and (ii) a different mesh is used to solve each energy group. The second method aims to capture the benefit from representing the flux from each energy group on a specifically optimised mesh. The k{sub eff} goal-based adaptive method was applied to three examples which illustrate the superior accuracy in criticality problems that can be obtained.

  8. TUNE: Compiler-Directed Automatic Performance Tuning

    SciTech Connect (OSTI)

    Hall, Mary

    2014-09-18

    This project has developed compiler-directed performance tuning technology targeting the Cray XT4 Jaguar system at Oak Ridge, which has multi-core Opteron nodes with SSE-3 SIMD extensions, and the Cray XE6 Hopper system at NERSC. To achieve this goal, we combined compiler technology for model-guided empirical optimization for memory hierarchies with SIMD code generation, which have been developed by the PIs over the past several years. We examined DOE Office of Science applications to identify performance bottlenecks and apply our system to computational kernels that operate on dense arrays. Our goal for this performance-tuning technology has been to yield hand-tuned levels of performance on DOE Office of Science computational kernels, while allowing application programmers to specify their computations at a high level without requiring manual optimization. Overall, we aim to make our technology for SIMD code generation and memory hierarchy optimization a crucial component of high-productivity Petaflops computing through a close collaboration with the scientists in national laboratories.

  9. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... days or through January 22, 2015. SWS - 17.8 working ... first aid and must be reported. DOEEM Goal for FY 2015 is 1.1 0.00 0.50 1.00 1.50 2.00 2.50 3.00 Dec-13 Jan-14 Feb-14 ...

  10. Solar Performance and Efficiency

    Broader source: Energy.gov [DOE]

    The conversion efficiency of a photovoltaic (PV) cell, or solar cell, is the percentage of the solar energy shining on a PV device that is converted into usable electricity. Improving this conversion efficiency is a key goal of research and helps make PV technologies cost-competitive with conventional sources of energy.

  11. Building America System Research Results. Innovations for High Performance Homes

    SciTech Connect (OSTI)

    none,

    2006-05-01

    This report provides a summary of key lessons learned from the first 10 years of the Building America program and also included a summary of the future challenges that must be met to reach the programs long term performance goals.

  12. HUBBLE SPACE TELESCOPE ACS IMAGING OF THE GOALS SAMPLE: QUANTITATIVE STRUCTURAL PROPERTIES OF NEARBY LUMINOUS INFRARED GALAXIES WITH L{sub IR} > 10{sup 11.4} L{sub Sun}

    SciTech Connect (OSTI)

    Kim, D.-C.; Evans, A. S.; Privon, G. C. E-mail: aevans@virginia.edu; and others

    2013-05-10

    A Hubble Space Telescope/Advanced Camera for Surveys study of the structural properties of 85 luminous and ultraluminous (L{sub IR} > 10{sup 11.4} L{sub Sun }) infrared galaxies (LIRGs and ULIRGs) in the Great Observatories All-sky LIRG Survey (GOALS) sample is presented. Two-dimensional GALFIT analysis has been performed on F814W ''I-band'' images to decompose each galaxy, as appropriate, into bulge, disk, central point-spread function (PSF) and stellar bar components. The fraction of bulge-less disk systems is observed to be higher in LIRGs (35%) than in ULIRGs (20%), with the disk+bulge systems making up the dominant fraction of both LIRGs (55%) and ULIRGs (45%). Further, bulge+disk systems are the dominant late-stage merger galaxy type and are the dominant type for LIRGs and ULIRGs at almost every stage of galaxy-galaxy nuclear separation. The mean I-band host absolute magnitude of the GOALS galaxies is -22.64 {+-} 0.62 mag (1.8{sup +1.4}{sub -0.4} L{sup *}{sub I}), and the mean bulge absolute magnitude in GOALS galaxies is about 1.1 mag fainter than the mean host magnitude. Almost all ULIRGs have bulge magnitudes at the high end (-20.6 to -23.5 mag) of the GOALS bulge magnitude range. Mass ratios in the GOALS binary systems are consistent with most of the galaxies being the result of major mergers, and an examination of the residual-to-host intensity ratios in GOALS binary systems suggests that smaller companions suffer more tidal distortion than the larger companions. We find approximately twice as many bars in GOALS disk+bulge systems (32.8%) than in pure-disk mergers (15.9%) but most of the disk+bulge systems that contain bars are disk-dominated with small bulges. The bar-to-host intensity ratio, bar half-light radius, and bar ellipticity in GOALS galaxies are similar to those found in nearby spiral galaxies. The fraction of stellar bars decreases toward later merger stages and smaller nuclear separations, indicating that bars are destroyed as the merger advances. In contrast, the fraction of nuclear PSFs increases toward later merger stages and is highest in late-stage systems with a single nucleus. Thus, light from an active galactic nucleus or compact nuclear star cluster is more visible at I band as ULIRGs enter their latter stages of evolution. Finally, both GOALS elliptical hosts and nearby Sloan Digital Sky Survey (SDSS) ellipticals occupy the same part of the surface brightness versus half-light radius plot (i.e., the {sup K}ormendy Relation{sup )} and have similar slopes, consistent with the possibility that the GOALS galaxies belong to the same parent population as the SDSS ellipticals.

  13. Buildings Performance Database (BPD) - 2014 BTO Peer Review | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy (BPD) - 2014 BTO Peer Review Buildings Performance Database (BPD) - 2014 BTO Peer Review Project Objective The overall goal of the Buildings Performance Database (BPD) is to provide public access to high-quality building characteristics and energy consumption data to incentivize, analyze, and validate energy efficiency investments. The project's objectives for this year are to: (1) significantly increase data acquisition, mapping, and cleansing, including an enhanced process for

  14. Hydraulic Performance and Mass Transfer Efficiency of Engineering Scale

    Office of Scientific and Technical Information (OSTI)

    Centrifugal Contactors (Conference) | SciTech Connect Hydraulic Performance and Mass Transfer Efficiency of Engineering Scale Centrifugal Contactors Citation Details In-Document Search Title: Hydraulic Performance and Mass Transfer Efficiency of Engineering Scale Centrifugal Contactors Annular centrifugal contactors (ACCs) are being evaluated for process-scale solvent extraction operations in support of Advanced Fuel Cycle Initiative (AFCI) separations goals. Process-scale annular

  15. Presidential Performance Contracting Challenge: Performance Toward...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    091515 President's Performance Contracting Challenge Status (September 15, 2015) Pipeline: Amount of project costs in procurement process and expected to award. Awarded:...

  16. Writing Performance Objectives

    Broader source: Energy.gov [DOE]

    Couse Description: This course provides the opportunity for supervisors and managers to write performance objectives or performance standards based on the department’s performance management system.

  17. Distributed performance counters

    DOE Patents [OSTI]

    Davis, Kristan D; Evans, Kahn C; Gara, Alan; Satterfield, David L

    2013-11-26

    A plurality of first performance counter modules is coupled to a plurality of processing cores. The plurality of first performance counter modules is operable to collect performance data associated with the plurality of processing cores respectively. A plurality of second performance counter modules are coupled to a plurality of L2 cache units, and the plurality of second performance counter modules are operable to collect performance data associated with the plurality of L2 cache units respectively. A central performance counter module may be operable to coordinate counter data from the plurality of first performance counter modules and the plurality of second performance modules, the a central performance counter module, the plurality of first performance counter modules, and the plurality of second performance counter modules connected by a daisy chain connection.

  18. Sandia/New Mexico's host, the City of Albuquerque, has a long-term goal of Zer

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sandia/New Mexico's host, the City of Albuquerque, has a long-term goal of Zero Waste to the Landfill by 2030. Zero Waste is generally accepted to mean greater than 90% of waste generation is diverted for an alternate purpose. In the last five years, SNL/NM has reduced its commercial solid waste by 23% and increased its recycling and composting from 46% to 67%. Building upon this recent success in waste diversion, SNL/NM is seeking to achieve Zero Waste to the Landfill by 2025. Reduce - Reuse -

  19. four-year goal

    National Nuclear Security Administration (NNSA)

    %2A en Material Disposition http:nnsa.energy.govaboutusourprogramsdnnm3dispose

    Page...

  20. Energy Efficiency Resource Goal

    Broader source: Energy.gov [DOE]

    NOTE: In pursuant to enacted legislation HB 1053, the VA State Corporation Commission has initiated a proceeding (Docket PUE-2016-00022) to seek input concerning i) existing measurement and...

  1. Energy Efficiency Goals

    Broader source: Energy.gov [DOE]

    Note: In September 2013, the Missouri PSC proposed rules outlining a broader set of ways in which utilities can recover their costs associated with encouraging investment in demand-side programs....

  2. Goals | Department of Energy

    Energy Savers [EERE]

    and use Reduce or stabilize energy costs Enhance and strengthen Indian tribal energy and economic infrastructure relating to natural resource development and electrification Bring...

  3. Performance and Optimization

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    application runtimes vs node placement. Read More Hopper Performance Monitoring Benchmarking performance of scientific applications on Hopper Read More Hopper:Improving IO...

  4. Performance Analysis with Vampir

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (frank.winkler@tu-dresden.de) Performance Analysis with Vampir Disclaimer Performance tools will not automatically make you code run faster. They help you understand, what your...

  5. High Performance Computing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HPC INL Logo Home High-Performance Computing INL's high-performance computing center provides general use scientific computing capabilities to support the lab's efforts in advanced...

  6. PV Reliability & Performance Model

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reliability & Performance Model - Sandia Energy Energy Search Icon Sandia Home Locations ... Twitter Google + Vimeo GovDelivery SlideShare PV Reliability & Performance Model Home...

  7. PV Performance and Reliability

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance and Reliability - Sandia Energy Energy Search Icon Sandia Home Locations ... Twitter Google + Vimeo GovDelivery SlideShare PV Performance and Reliability Home...

  8. Massively parallel processing on the Intel Paragon system: One tool in achieving the goals of the Human Genome Project

    SciTech Connect (OSTI)

    Ecklund, D.J.

    1993-12-31

    A massively parallel computing system is one tool that has been adopted by researchers in the Human Genome Project. This tool is one of many in a toolbox of theories, algorithms, and systems that are used to attack the many questions posed by the project. A good tool functions well when applied alone to the problem for which it was devised. A superior tool achieves its solitary goal, and supports and interacts with other tools to achieve goals beyond the scope of any individual tool. The author believes that Intel`s massively parallel Paragon{trademark} XP/S system is a superior tool. This paper presents specific requirements for a superior computing tool for the Human Genome Project (HGP) and shows how the Paragon system addresses these requirements. Computing requirements for HGP are based on three factors: (1) computing requirements of algorithms currently used in sequence homology, protein folding, and database insertion/retrieval; (2) estimates of the computing requirements of new applications arising from evolving biological theories; and (3) the requirements for facilities that support collaboration among scientists in a project of this magnitude. The Paragon system provides many hardware and software features that effectively address these requirements.

  9. DOE/IG Annual Performance Report FY 2008, Annual Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOEIG Annual Performance Report FY 2008, Annual Performance Plan FY 2009 DOEIG Annual Performance Report FY 2008, Annual Performance Plan FY 2009 DOEIG Annual Performance Report ...

  10. Math Library Performance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Math Library Performance Math Library Performance Fully optimizing a given application's performance often requires a deep understanding of the source, an accurate profile for a representative run, and the ability to have changes to the source accepted upstream. However, in many cases, significant performance gains can be achieved by simply optimizing the code over the matrix of possible compilers, compiler options and libraries available on a given machine. Here, we explore the performance

  11. DOE High Performance Concentrator PV Project

    SciTech Connect (OSTI)

    McConnell, R.; Symko-Davies, M.

    2005-08-01

    Much in demand are next-generation photovoltaic (PV) technologies that can be used economically to make a large-scale impact on world electricity production. The U.S. Department of Energy (DOE) initiated the High-Performance Photovoltaic (HiPerf PV) Project to substantially increase the viability of PV for cost-competitive applications so that PV can contribute significantly to both our energy supply and environment. To accomplish such results, the National Center for Photovoltaics (NCPV) directs in-house and subcontracted research in high-performance polycrystalline thin-film and multijunction concentrator devices with the goal of enabling progress of high-efficiency technologies toward commercial-prototype products. We will describe the details of the subcontractor and in-house progress in exploring and accelerating pathways of III-V multijunction concentrator solar cells and systems toward their long-term goals. By 2020, we anticipate that this project will have demonstrated 33% system efficiency and a system price of $1.00/Wp for concentrator PV systems using III-V multijunction solar cells with efficiencies over 41%.

  12. Office of HC Strategy Budget and Performance Metrics (HC-50) | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Strategy Budget and Performance Metrics (HC-50) Office of HC Strategy Budget and Performance Metrics (HC-50) Mission Statement and Function Statement The Office of Human Capital Strategy, Budget, and Performance Metrics provides strategic direction and advice to its stakeholders through the integration of budget analysis, workforce projections, and performance metrics in support of the goals and missions of the Department of Energy. Functions: Promotes business partnerships with

  13. Performance on Edison

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Edison Performance Performance on Edison October 10, 2013 Edison-system.pdf.jpg Thursday, Oct. 10, 2013 9:00 a.m. to 2:15 p.m. PDT Attendance: 121 (111 online, 10 local) Location...

  14. Human performance modeling for system of systems analytics: combat performance-shaping factors.

    SciTech Connect (OSTI)

    Lawton, Craig R.; Miller, Dwight Peter

    2006-01-01

    The US military has identified Human Performance Modeling (HPM) as a significant requirement and challenge of future systems modeling and analysis initiatives. To support this goal, Sandia National Laboratories (SNL) has undertaken a program of HPM as an integral augmentation to its system-of-system (SoS) analytics capabilities. The previous effort, reported in SAND2005-6569, evaluated the effects of soldier cognitive fatigue on SoS performance. The current effort began with a very broad survey of any performance-shaping factors (PSFs) that also might affect soldiers performance in combat situations. The work included consideration of three different approaches to cognition modeling and how appropriate they would be for application to SoS analytics. This bulk of this report categorizes 47 PSFs into three groups (internal, external, and task-related) and provides brief descriptions of how each affects combat performance, according to the literature. The PSFs were then assembled into a matrix with 22 representative military tasks and assigned one of four levels of estimated negative impact on task performance, based on the literature. Blank versions of the matrix were then sent to two ex-military subject-matter experts to be filled out based on their personal experiences. Data analysis was performed to identify the consensus most influential PSFs. Results indicate that combat-related injury, cognitive fatigue, inadequate training, physical fatigue, thirst, stress, poor perceptual processing, and presence of chemical agents are among the PSFs with the most negative impact on combat performance.

  15. Contractor Past Performance Information

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Examples of supportable program and contract management data include cost performance reports, customer comments, quality reviews, technical interchange meetings, financial ...

  16. Performance and Optimization

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Optimization Performance and Optimization Compiler Comparisons Comparison of different compilers with different options on several benchmarks. Read More » Using OpenMP Effectively Performance implications and case studies of codes combining MPI and OpenMP Read More » Reordering MPI Ranks Reordering MPI ranks can result in improved application performance depending on the communication patterns of the application. Read More » Application Performance Variability on Hopper How an application is

  17. Contractor Past Performance Information

    Broader source: Energy.gov (indexed) [DOE]

    2013) 3 the use of contractor performance information, outlines associated management responsibilities that agency Chief Acquisition Officers (CAOs) and Senior...

  18. Complier-Directed Automatic Performance Tuning (TUNE) Final Report

    SciTech Connect (OSTI)

    Chame, Jacqueline

    2013-06-07

    TUNE was created to develop compiler-directed performance tuning technology targeting the Cray XT4 system at Oak Ridge. TUNE combines compiler technology for model-guided empirical optimization for memory hierarchies with SIMD code generation. The goal of this performance-tuning technology is to yield hand-tuned levels of performance on DOE Office of Science computational kernels, while allowing application programmers to specify their computations at a high level without requiring manual optimization. Overall, TUNE aims to make compiler technology for SIMD code generation and memory hierarchy optimization a crucial component of high-productivity Petaflops computing through a close collaboration with the scientists in national laboratories.

  19. IR DIAL performance modeling

    SciTech Connect (OSTI)

    Sharlemann, E.T.

    1994-07-01

    We are developing a DIAL performance model for CALIOPE at LLNL. The intent of the model is to provide quick and interactive parameter sensitivity calculations with immediate graphical output. A brief overview of the features of the performance model is given, along with an example of performance calculations for a non-CALIOPE application.

  20. Energy Savings Performance Contracting: Guidelines for Developing, Staffing, and Overseeing a State Program

    Broader source: Energy.gov [DOE]

    The Energy Savings Performance Contracting Guidelines for Developing, Staffing, and Overseeing a State Program (Program Guidelines) provide information, best practices, and resources on how to develop an Energy Savings Performance Contracting (ESPC) program. The goal is to increase acceptance and use of ESPC by state and local governments to achieve large-scale and comprehensive energy-saving projects.

  1. High Performance Home Cost Performance Trade-Offs: Production...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    High Performance Home Cost Performance Trade-Offs: Production Builders - Building America Top Innovation High Performance Home Cost Performance Trade-Offs: Production Builders - ...

  2. Communicating Performance Assessments Results - 13609

    SciTech Connect (OSTI)

    Layton, Mark

    2013-07-01

    The F-Area Tank Farms (FTF) and H-Area Tank Farm (HTF) are owned by the U.S. Department of Energy (DOE) and operated by Savannah River Remediation LLC (SRR), Liquid Waste Operations contractor at DOE's Savannah River Site (SRS). The FTF and HTF are active radioactive waste storage and treatment facilities consisting of 51 carbon steel waste tanks and ancillary equipment such as transfer lines, evaporators and pump tanks. Performance Assessments (PAs) for each Tank Farm have been prepared to support the eventual closure of the underground radioactive waste tanks and ancillary equipment. PAs provide the technical bases and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements for final closure of the Tank Farms. The Tank Farms are subject to a number of regulatory requirements. The State regulates Tank Farm operations through an industrial waste water permit and through a Federal Facility Agreement approved by the State, DOE and the Environmental Protection Agency (EPA). Closure documentation will include State-approved Tank Farm Closure Plans and tank-specific closure modules utilizing information from the PAs. For this reason, the State of South Carolina and the EPA must be involved in the performance assessment review process. The residual material remaining after tank cleaning is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005. PAs are performance-based, risk-informed analyses of the fate and transport of FTF and HTF residual wastes following final closure of the Tank Farms. Since the PAs serve as the primary risk assessment tools in evaluating readiness for closure, it is vital that PA conclusions be communicated effectively. In the course of developing the FTF and HTF PAs, several lessons learned have emerged regarding communicating PA results. When communicating PA results it is important to stress that the primary goal of the PA results is to provide risk understanding, recognizing the magnitude of risk and identifying the conceptual model decisions and critical assumptions that most impact the results. Conceptual models that describe reality using simplified, mathematical approaches, and their roles in arriving at the PA results, must also be communicated. When presenting PA results, evaluations will typically be focused on a single baseline (or Base Case) to provide a foundation for discussion. The PA results are supplemented by other studies (alternate configurations, uncertainty analyses, and sensitivity analyses) which provide a breadth of modeling to supplement the Base Case. The suite of information offered by the various modeling cases and studies provides confidence that the overall risk is understood along with the underlying parameters and conditions that contribute to risk. (author)

  3. Development of Metric for Measuring the Impact of RD&D Funding on GTO's Geothermal Exploration Goals (Presentation)

    SciTech Connect (OSTI)

    Jenne, S.; Young, K. R.; Thorsteinsson, H.

    2013-04-01

    The Department of Energy's Geothermal Technologies Office (GTO) provides RD&D funding for geothermal exploration technologies with the goal of lowering the risks and costs of geothermal development and exploration. In 2012, NREL was tasked with developing a metric to measure the impacts of this RD&D funding on the cost and time required for exploration activities. The development of this metric included collecting cost and time data for exploration techniques, creating a baseline suite of exploration techniques to which future exploration and cost and time improvements could be compared, and developing an online tool for graphically showing potential project impacts (all available at http://en.openei.org/wiki/Gateway:Geothermal). The conference paper describes the methodology used to define the baseline exploration suite of techniques (baseline), as well as the approach that was used to create the cost and time data set that populates the baseline. The resulting product, an online tool for measuring impact, and the aggregated cost and time data are available on the Open EI website for public access (http://en.openei.org).

  4. Performance and market evaluation of the bladeless turbine

    SciTech Connect (OSTI)

    Garrett-Price, B.A.; Barnhart, J.S.; Eschbach, E.J.

    1982-10-01

    The three-inch diameter prototype bladeless turbine was tested with air over a range of inlet pressures from 20 to 100 psia and speeds of 10, 20, 30 and 40 thousand rpm. The peak efficiency of 22.5 percent was recorded at a pressure of 98 psia and a speed of 40,000 rpm. Efficiency increased slightly with speed and inlet pressure over the range of test conditions. The test program was somewhat hindered by mechanical failures. The turbine bearings in particular were unreliable, with two instances of outright failure and numerous cases of erratic performance. A model of the bladeless turbine was developed to aid in interpreting the experimental results. A macroscopic approach, incorporating several favorable assumptions, was taken to place a reasonable upper bound on turbine efficiency. The model analytically examines the flow through the air inlet nozzles and the interaction between the fluid jet and the turbine blades. The analysis indicates that the maximum possible efficiency of a tangential flow turbine with straight axial blades is 50 percent. This is a direct consequence of turning the fluid only 90 degrees relative to the turbine blade. The adoption of the bladeless turbine as the expander in an Organic Rankine Cycle (ORC) will depend to a great extent on the efficiency of the turbine. The market potential for ORC technology will also impact the adoption of the bladeless turbine. Other expanders have demonstrated efficiencies of 60 to 80% in ORC systems. The Gamell turbine had a peak test efficiency of 22.5% and a maximum theoretical efficiency of 50%. Costs of the turbine are highly uncertain, relying to a great extent on cost reductions achieved through quantity production and through learning.

  5. Buildings Performance Database Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Overview Buildings.energy.gov/BPD BuildingsPerformanceDatabase@ee.doe.gov 2 * The BPD statistically analyzes trends in the energy performance and physical & operational characteristics of real commercial and residential buildings. The Buildings Performance Database 3 Design Principles * The BPD contains actual data on existing buildings - not modeled data or anecdotal evidence. * The BPD enables statistical analysis without revealing information about individual buildings. * The BPD cleanses

  6. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 Monthly Performance Report September 2015 W. K. Johnson President U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report SEP 2015 DOE/RL-2009-113 Rev 72 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report SEP 2015 DOE/RL-2009-113 Rev 72 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  7. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 Monthly Performance Report January 2016 W. K. Johnson President U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report JAN 2016 DOE/RL-2009-113 Rev 76 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report JAN 2016 DOE/RL-2009-113 Rev 76 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  8. MSC Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 Monthly Performance Report August 2013 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report AUG 2013 DOE/RL-2009-113 Rev 47 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report AUG 2013 DOE/RL-2009-113 Rev 47 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  9. MSC Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 Monthly Performance Report February 2010 F.A. Figueroa President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report February 2010 DOE/RL-2009-113 REV 5 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report February 2010 DOE/RL-2009-113 REV 5 iii CONTENTS OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key

  10. MSC Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Monthly Performance Report November 2009 F.A. Figueroa President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report November 2009 DOE/RL-2009-113 REV 2 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report November 2009 DOE/RL-2009-113 REV 2 iii CONTENTS OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key

  11. MSC Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 Monthly Performance Report May 2010 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report May 2010 DOE/RL-2009-113 REV 8 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report May 2010 DOE/RL-2009-113 REV 8 iii CONTENTS OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  12. MSC Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 Monthly Performance Report July 2011 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report July 2011 DOE/RL-2009-113 REV 22 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report July 2011 DOE/RL-2009-113 REV 22 iii CONTENTS OVERVIEW 1.0 INTRODUCTION ......................................................................................................................... 1 1.1 Key Accomplishments

  13. MSC Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 Monthly Performance Report June 2011 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report June 2011 DOE/RL-2009-113 REV 21 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report June 2011 DOE/RL-2009-113 REV 21 iii CONTENTS OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  14. MSC Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 Monthly Performance Report March 2011 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report March 2011 DOE/RL-2009-113 REV 18 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report March 2011 DOE/RL-2009-113 REV 18 iii CONTENTS OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  15. MSC Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 Monthly Performance Report May 2011 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report May 2011 DOE/RL-2009-113 REV 20 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report May 2011 DOE/RL-2009-113 REV 20 iii CONTENTS OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  16. MSC Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 Monthly Performance Report November 2011 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report Nov 2011 DOE/RL-2009-113 Rev 26 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report Nov 2011 DOE/RL-2009-113 Rev 26 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key

  17. Performance Measurement Analysis System

    Energy Science and Technology Software Center (OSTI)

    1989-06-01

    The PMAS4.0 (Performance Measurement Analysis System) is a user-oriented system designed to track the cost and schedule performance of Department of Energy (DOE) major projects (MPs) and major system acquisitions (MSAs) reporting under DOE Order 5700.4A, Project Management System. PMAS4.0 provides for the analysis of performance measurement data produced from management control systems complying with the Federal Government''s Cost and Schedule Control Systems Criteria.

  18. High Performance Energy Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance Energy Management Reduce energy use and meet your business objectives By applying continuous improvement practices similar to Lean and Six Sigma, the BPA Energy Smart...

  19. Application Porting and Performance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    opportunities, and manage multiple hierarchies of memory effectively. In the web pages that follow we document strategies for improving your application's performance....

  20. Improving Contractor Past Performance

    Broader source: Energy.gov [DOE]

    The Office of Federal Procurement Policy, (OFPP) performed an assessment of how well some agencies, including the Department of Energy, are managing these efforts. The attached OFPP memorandum of January 21, 2011, entitled "Improving the Use of Contractor Performance Information Assessments: Summary of the Office of Federal Procurement Policy's review, and Strategies for Improvement" provides the details of this assessment which includes the Department of Energy. Also, the memo provides some very good guidance on preparing contractor performance evaluation reports. The Acquisition Guide Chapter 42.15 Contractor Performance Information incorporates the guidance that is not otherwise part of the Chapter. Revisions are made to Section II – Parts C and I.

  1. Guidelines for Performance Measurement

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-06-30

    Federal agencies, states, businesses, and foreign governments are increasingly relying on performance measurement information to help chart progress in increasingly frugal times. No cancellations.

  2. Performance and Optimization

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Math Library Performance Core Specialization Hyper-Threading DLFM library tools for large ... The compilers are also compared against one another on the... Read More Math Library ...

  3. Advances in Performance Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    safety of geologic repositories for radioactive waste disposal called "performance assessment", PA. The discipline of PA continues to advance within the Defense Waste Management...

  4. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... intended to provide an executive-level performance overview. ... Pollution Prevention and Waste Minimization Program, which ... Facilities and Land Management team continued ...

  5. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... intended to provide an executive-level performance overview. ... On-time delivery status at Waste Sampling and ... PD Project Development. PMTO Portfolio Management Task ...

  6. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... intended to provide an executive-level performance overview. ... to Program Data and Management System (PDMS) for use in ... Waste Sampling and Characterization Facility (WSCF) On-Time ...

  7. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... to provide an executive-level performance overview. ... Report JAN 2012 DOERL-2009-113 Rev 28 2 of ... - MSA Information Management (IM) continues ...

  8. Contractor Past Performance Information

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... satisfactory performance record or lack of satisfactory record of integrity and business ethics; and o The Small Business Administration does not issue a Certificate of Competency. ...

  9. Hopper Performance and Optimization

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance and Optimization Compiler Comparisons Comparison of different compilers with different options on several benchmarks. Read More Using OpenMP Effectively...

  10. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... proper lifting techniques, and daily stretching and flexing. ... in support of spent fuel activities. 9302014 930... TOTAL OBJECTIVE FEE POOL 5.0 Comprehensive Performance - ...

  11. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... will be increasing WIPP shipments to a daily frequency. ... with integrated scheduling and performance evaluation. ... the planned use of 45,000 gallons of diesel fuel per day. ...

  12. ARM - 2008 Performance Metrics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 Performance Metrics Science Research Themes Research Highlights Journal Articles Collaborations Atmospheric System Research (ASR) Earth System Modeling Regional & Global Climate...

  13. ARM - 2006 Performance Metrics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 Performance Metrics Science Research Themes Research Highlights Journal Articles Collaborations Atmospheric System Research (ASR) Earth System Modeling Regional & Global Climate...

  14. ARM - 2009 Performance Metrics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 Performance Metrics Science Research Themes Research Highlights Journal Articles Collaborations Atmospheric System Research (ASR) Earth System Modeling Regional & Global Climate...

  15. Contractor Past Performance Information

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    officers as they evaluate the integrity and performance of prospective contractors. ... 52.209-8) Contractor Sampling, random inspection of the FAPIIS and other relevant sources. ...

  16. HVAC Performance Maps

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... models for building energy simulation tools (mathematical framework - what are the right ... integrated HPWHs were performance mapped in NREL's Advanced HVAC Systems Laboratory. ...

  17. Multifamily Performance Program

    Broader source: Energy.gov [DOE]

    Under NYSERDA’s Multifamily Performance Program (MPP), new construction of multifamily buildings and existing multifamily buildings are eligible for incentives that improve energy savings through...

  18. High Performance Sustainable Buildings

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    science and bioscience capabiities. Occupational Medicine will become a High Performance Sustainable Building in 2013. On the former County landfill, a photovoltaic array field...

  19. Sustainability Performance Office News

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    management-spo1461771 Sustainability Performance Office News en Executive Order 13693 Training Now Available On Demand http:energy.govmanagementspoarticles...

  20. Contractor Past Performance Information

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    performance record or lack of satisfactory record of integrity and business ethics; and o The Small Business Administration does not issue a Certificate of Competency....

  1. Technical Basis for Assessing Uranium Bioremediation Performance

    SciTech Connect (OSTI)

    PE Long; SB Yabusaki; PD Meyer; CJ Murray; AL N’Guessan

    2008-04-01

    In situ bioremediation of uranium holds significant promise for effective stabilization of U(VI) from groundwater at reduced cost compared to conventional pump and treat. This promise is unlikely to be realized unless researchers and practitioners successfully predict and demonstrate the long-term effectiveness of uranium bioremediation protocols. Field research to date has focused on both proof of principle and a mechanistic level of understanding. Current practice typically involves an engineering approach using proprietary amendments that focuses mainly on monitoring U(VI) concentration for a limited time period. Given the complexity of uranium biogeochemistry and uranium secondary minerals, and the lack of documented case studies, a systematic monitoring approach using multiple performance indicators is needed. This document provides an overview of uranium bioremediation, summarizes design considerations, and identifies and prioritizes field performance indicators for the application of uranium bioremediation. The performance indicators provided as part of this document are based on current biogeochemical understanding of uranium and will enable practitioners to monitor the performance of their system and make a strong case to clients, regulators, and the public that the future performance of the system can be assured and changes in performance addressed as needed. The performance indicators established by this document and the information gained by using these indicators do add to the cost of uranium bioremediation. However, they are vital to the long-term success of the application of uranium bioremediation and provide a significant assurance that regulatory goals will be met. The document also emphasizes the need for systematic development of key information from bench scale tests and pilot scales tests prior to full-scale implementation.

  2. Employee Performance Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-03-14

    To establish requirements and responsibilities for employee performance appraisals, performance-related awards, and other forms of employee recognition. Cancels DOE O 331.1A and (2) existing provisions of DOE O 3450.1B. Cancelled by DOE O 331.1C.

  3. Employee Performance Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-03-14

    To establish requirements and responsibilities for employee performance appraisals, performance-related awards, and other forms of employee recognition. (Cancels existing provisions of DOE O 3450.1B, Incentive Awards, dated 6/23/92.) Cancels DOE O 331.1A, DOE O 3450.1B. Canceled by DOE O 331.1C

  4. Employee Performance Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-06-15

    To establish requirements and responsibilities for employee performance appraisals, performance-related awards, and other forms of employee recognition. This Order covers most employees at grades GS-15 and below. Cancels DOE O 331.1. Canceled by DOE O 331.1B.

  5. Superior Energy Performance Video

    Broader source: Energy.gov [DOE]

    Energy Efficiency, Competitiveness, Transparency. These are the tenets of the Superior Energy Performance® (SEP™). SEP is a market-based program that helps manufacturers to improve their plants' energy performance, which in turn helps to make them more competitive.

  6. Technology Performance Exchange

    SciTech Connect (OSTI)

    2015-09-01

    To address the need for accessible, high-quality data, the Department of Energy has developed the Technology Performance Exchange (TPEx). TPEx enables technology suppliers, third-party testing laboratories, and other entities to share product performance data. These data are automatically transformed into a format that technology evaluators can easily use in their energy modeling assessments to inform procurement decisions.

  7. Performance testing accountability measurements

    SciTech Connect (OSTI)

    Oldham, R.D.; Mitchell, W.G.; Spaletto, M.I.

    1993-12-31

    The New Brunswick Laboratory (NBL) provides assessment support to the DOE Operations Offices in the area of Material Control and Accountability (MC and A). During surveys of facilities, the Operations Offices have begun to request from NBL either assistance in providing materials for performance testing of accountability measurements or both materials and personnel to do performance testing. To meet these needs, NBL has developed measurement and measurement control performance test procedures and materials. The present NBL repertoire of performance tests include the following: (1) mass measurement performance testing procedures using calibrated and traceable test weights, (2) uranium elemental concentration (assay) measurement performance tests which use ampulated solutions of normal uranyl nitrate containing approximately 7 milligrams of uranium per gram of solution, and (3) uranium isotopic measurement performance tests which use ampulated uranyl nitrate solutions with enrichments ranging from 4% to 90% U-235. The preparation, characterization, and packaging of the uranium isotopic and assay performance test materials were done in cooperation with the NBL Safeguards Measurements Evaluation Program since these materials can be used for both purposes.

  8. Taming the Wild World of Management, Performance and Communication - 13459

    SciTech Connect (OSTI)

    Ford, Laurie

    2013-07-01

    Management has evolved a long way from its original meaning of 'governing a horse'. The industrial revolution fostered 'scientific management'; 1930's Hawthorne studies discovered that people's social interactions could alter productivity; and the dawn of the computer age in the post-war 1950's brought general systems theory into management thinking. Today, mobile wireless connectivity aims to transform ever-changing networks of players, mandates, and markets into something that can be 'managed'. So why is there no clear and simple recipe for how to practice management? We talk about financial management, safety management, and operations management, but surely the 'management' part of those endeavors will share the same set of practices. Instead, we are still arguing for 'management' to include everything from developing people to negotiating contracts. A manager's job may include many things, but one of them, the job of management, needs to be nailed down. Three standard practices for managing in a network are developed: (a) support the dialogues that connect people vital to accomplishing a goal or objective; (b) develop and sustain the scoreboards that serve as a road-map to reach the goal; and (c) control the feedback to 'govern the horse'. These three practices are useful for more than reaching goals, as they also support coordinating across boundaries and running productive meetings. The dialogues for productive relationships, scoreboards for goals and deliverables, and feedback for performance together constitute a recipe for managing in a networked world. (authors)

  9. DOE Sustainability Performance Office FY14 Budget At-a-Glance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    OFFICE FY14 BUDGET AT-A-GLANCE DOE SUSTAINABILITY PERFORMANCE OFFICE FY 14 BUDGET AT-A-GLANCE The Sustainability Performance Office (SPO) supports DOE's internal activities to meet goals related to sustainability, including energy; water; land and paper conservation and use; greenhouse gas emission reductions; and other objectives related to sustainability such as the development of DOE's annual Strategic Sustainability Performance Plan (SSPP). The SPO provides support and assistance to the DOE

  10. Home Performance with ENERGY STAR - 2014 BTO Peer Review | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy STAR - 2014 BTO Peer Review Home Performance with ENERGY STAR - 2014 BTO Peer Review Presenter: Ely Jacobsohn, U.S. Department of Energy The goal of Home Performance with ENERGY STAR (HPwES) is to help homeowners improve the efficiency and comfort of their homes using a comprehensive, whole-house approach, while also helping to protect the environment. HPwES provides homeowners with resources to identify trusted contractors to recommend and perform energy improvements so that

  11. Performance Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Performance Plans Performance Plans November 13, 2015 Combined Fiscal Year (FY) 2015 Annual Performance Results and FYs 2016 and 2017 Annual Performance Plan Combined Fiscal Year (FY) 2015 Annual Performance Results and FYs 2016 and 2017 Annual Performance Plan November 6, 2014 Combined Fiscal Year (FY) 2014 Annual Performance Results and FYs 2015 and 2016 Annual Performance Plan Combined Fiscal Year (FY) 2014 Annual Performance Results and FYs 2015 and 2016 Annual Performance Plan December 13,

  12. Performance (perfSONAR)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance (perfSONAR) Network R&D Software-Defined Networking (SDN) Experimental Network Testbeds Performance (perfSONAR) Software & Tools Development Data for Researchers Partnerships Publications Workshops Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site Feedback: info@es.net Network Performance and Troubleshooting (perfSONAR) perfSONAR:

  13. Performance expectation plan

    SciTech Connect (OSTI)

    Ray, P.E.

    1998-09-04

    This document outlines the significant accomplishments of fiscal year 1998 for the Tank Waste Remediation System (TWRS) Project Hanford Management Contract (PHMC) team. Opportunities for improvement to better meet some performance expectations have been identified. The PHMC has performed at an excellent level in administration of leadership, planning, and technical direction. The contractor has met and made notable improvement of attaining customer satisfaction in mission execution. This document includes the team`s recommendation that the PHMC TWRS Performance Expectation Plan evaluation rating for fiscal year 1998 be an Excellent.

  14. Building Performance Database

    Broader source: Energy.gov [DOE]

    The Building Performance Database (BPD) unlocks the power of building data by providing access to the largest publicly-available dataset of information about the physical and operational characteristics of real buildings. The BPD enables users to perform statistical analysis on an anonymous dataset of hundreds of thousands of commercial and residential buildings from across the country. Users can examine specific building types and geographic areas, compare performance trends among similar buildings, identify and prioritize cost-saving energy efficiency improvements, and assess the range of likely savings from these improvements.

  15. Automated Cache Performance Analysis And Optimization

    SciTech Connect (OSTI)

    Mohror, Kathryn

    2013-12-23

    While there is no lack of performance counter tools for coarse-grained measurement of cache activity, there is a critical lack of tools for relating data layout to cache behavior to application performance. Generally, any nontrivial optimizations are either not done at all, or are done by hand requiring significant time and expertise. To the best of our knowledge no tool available to users measures the latency of memory reference instructions for partic- ular addresses and makes this information available to users in an easy-to-use and intuitive way. In this project, we worked to enable the Open|SpeedShop performance analysis tool to gather memory reference latency information for specific instructions and memory ad- dresses, and to gather and display this information in an easy-to-use and intuitive way to aid performance analysts in identifying problematic data structures in their codes. This tool was primarily designed for use in the supercomputer domain as well as grid, cluster, cloud-based parallel e-commerce, and engineering systems and middleware. Ultimately, we envision a tool to automate optimization of application cache layout and utilization in the Open|SpeedShop performance analysis tool. To commercialize this soft- ware, we worked to develop core capabilities for gathering enhanced memory usage per- formance data from applications and create and apply novel methods for automatic data structure layout optimizations, tailoring the overall approach to support existing supercom- puter and cluster programming models and constraints. In this Phase I project, we focused on infrastructure necessary to gather performance data and present it in an intuitive way to users. With the advent of enhanced Precise Event-Based Sampling (PEBS) counters on recent Intel processor architectures and equivalent technology on AMD processors, we are now in a position to access memory reference information for particular addresses. Prior to the introduction of PEBS counters, cache behavior could only be measured reliably in the ag- gregate across tens or hundreds of thousands of instructions. With the newest iteration of PEBS technology, cache events can be tied to a tuple of instruction pointer, target address (for both loads and stores), memory hierarchy, and observed latency. With this information we can now begin asking questions regarding the efficiency of not only regions of code, but how these regions interact with particular data structures and how these interactions evolve over time. In the short term, this information will be vital for performance analysts understanding and optimizing the behavior of their codes for the memory hierarchy. In the future, we can begin to ask how data layouts might be changed to improve performance and, for a particular application, what the theoretical optimal performance might be. The overall benefit to be produced by this effort was a commercial quality easy-to- use and scalable performance tool that will allow both beginner and experienced parallel programmers to automatically tune their applications for optimal cache usage. Effective use of such a tool can literally save weeks of performance tuning effort. Easy to use. With the proposed innovations, finding and fixing memory performance issues would be more automated and hide most to all of the performance engineer exper- tise under the hood of the Open|SpeedShop performance tool. One of the biggest public benefits from the proposed innovations is that it makes performance analysis more usable to a larger group of application developers. Intuitive reporting of results. The Open|SpeedShop performance analysis tool has a rich set of intuitive, yet detailed reports for presenting performance results to application developers. Our goal was to leverage this existing technology to present the results from our memory performance addition to Open|SpeedShop. Suitable for experts as well as novices. Application performance is getting more difficult to measure as the hardware platforms they run on become more complicated. This makes life dif

  16. Healthcare Project Performance Benchmarks

    Broader source: Energy.gov [DOE]

    Reports five major performance metrics that can be used to benchmark proposed energy service company projects within the healthcare industry, disaggregated and reported by major retrofit strategy. Author: U.S. Department of Energy

  17. DAS performance analysis

    SciTech Connect (OSTI)

    Bates, G.; Bodine, S.; Carroll, T.; Keller, M.

    1984-02-01

    This report begins with an overview of the Data Acquisition System (DAS), which supports several of PPPL's experimental devices. Performance measurements which were taken on DAS and the tools used to make them are then described.

  18. MSC Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Report January 2010 F.A. Figueroa President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report January 2010 DOE...

  19. MSC Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Report December 2009 F.A. Figueroa President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report December 2009 DOE...

  20. Energy Savings Performance Contracts

    Broader source: Energy.gov [DOE]

    An Energy Savings Performance Contract (ESPC) is a partnership between a system owner and an Energy Services Company (ESCO). The ESCO conducts a comprehensive energy audit for the facility under...

  1. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 ... First Aid 12-Month Average FY 4.22 CY 4.74 EXECUTIVE OVERVIEW EXECUTIVE OVERVIEW MSC Monthly Performance Report MAY 2013 ...

  2. Energy Performance Contracting

    Broader source: Energy.gov [DOE]

    Provides an Energy Savings Performance Contracting (ESPC) overview and summary of ESPC resources, including training, sample documents, and guides from the U.S. Department of Housing and Urban Development. Author: U.S. Department of Housing and Urban Development

  3. DOE SES PERFORMANCE MANAGEMENT

    Broader source: Energy.gov [DOE]

    This covers Department of Energy SES executives, as well as those Presidential appointees who have retained eligibility for SES performance appraisals and awards under 5 U.S.C. 3392(c).

  4. High Performance Sustainable Building

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-11-09

    This Guide highlights the DOE O 413.3B drivers for incorporating high performance sustainable building (HPSB) principles into Critical Decisions 1 through 4 and provides guidance for implementing the Order's HPSB requirements.

  5. High Performance Sustainable Building

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-11-09

    This Guide provides approaches for implementing the High Performance Sustainable Building (HPSB) requirements of DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets. Supersedes DOE G 413.3-6.

  6. Pay for Performance Program

    Broader source: Energy.gov [DOE]

    The New Hampshire Pay for Performance (P4P) program works with large energy consumers to improve energy efficiency in their facilities. This program is available to commercial, industrial, and...

  7. Performance Application Programming Interface

    Energy Science and Technology Software Center (OSTI)

    2005-10-31

    PAPI is a programming interface designed to provide the tool designer and application engineer with a consistent interface and methodology for use of the performance counter hardware found in most major microprocessors. PAPI enables software engineers to see, in near real time, the relation between software performance and processor events. This release covers the hardware dependent implementation of PAPI version 3 for the IBM BlueGene/L (BG/L) system.

  8. Electric Vehicle Battery Performance

    Energy Science and Technology Software Center (OSTI)

    1992-02-20

    DIANE is used to analyze battery performance in electric vehicle (EV) applications. The principal objective of DIANE is to enable the prediction of EV performance on the basis of laboratory test data for batteries. The model provides a second-by-second simulation of battery voltage and current for any specified velocity/time or power/time profile. Two releases are included with the package. Diane21 has a graphics capability; DIANENP has no graphics capability.

  9. Performance-based Contracting

    Energy Savers [EERE]

    Performance-based Contracting [Reference: FAR 37.6; DEAR 970.1001] Overview This section provides guidance and instruction for the development and administration of Performance-Based Contracting concepts for the Department's management and operating contracts, and other major operating contracts, as appropriate. Background In 1997, the Department published a final rule (62 FR 34842) which implemented a number of recommendations principally in areas relating to the acquisition processes of its

  10. Application Porting and Performance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Application Porting and Performance Application Porting and Performance We expect many applications will need to make code modifications in order to run efficiently on the Cori Phase 2 Knights Landing manycore architecture. To run well on Cori Phase 2, your application will need to have good thread scalability, take advantage of vectorization opportunities, and manage multiple hierarchies of memory effectively. In the web pages that follow we document strategies for improving your application's

  11. Application Porting and Performance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Profiling Your Application Improving OpenMP Scaling Measuring and Understanding Memory Bandwidth Vectorization Using on-package memory Using High Performance Libraries and Tools Testbeds Cori Training Dungeon Session Worksheet NESAP NERSC-8 Procurement Programming models File Storage and I/O Edison PDSF Genepool Testbeds Retired Systems Storage & File Systems Data & Analytics Connecting to NERSC Queues and Scheduling Job Logs & Statistics Application Performance Training &

  12. PERFORMANCE GUARANTEE AGREEMENT

    National Nuclear Security Administration (NNSA)

    F PERFORMANCE GUARANTEE SEE ATTACHED Appendix F - Page 308 PERFORMANCE GUARANTEE AGREEMENT For value received, and in consideration of, and in order to induce the United States (the Government) to enter into Contract DE-AC52-07NA27344 for the management and operation of the Lawrence Livermore National Laboratory (the "Contract") dated __________, by and between the Government and Lawrence Livermore National Security LLC (Contractor), the undersigned, Bechtel National, Inc. (Guarantor),

  13. Materials Performance in USC Steam Portland

    SciTech Connect (OSTI)

    G.R. Holcomb; J. Tylczak; R. Hu

    2011-04-26

    Goals of the U.S. Department of Energy's Advanced Power Systems Initiatives include power generation from coal at 60% efficiency, which requires steam conditions of up to 760 C and 340 atm, co-called advanced ultrasupercritical (A-USC) steam conditions. A limitation to achieving the goal is a lack of cost-effective metallic materials that can perform at these temperatures and pressures. Some of the more important performance limitations are high-temperature creep strength, fire-side corrosion resistance, and steam-side oxidation resistance. Nickel-base superalloys are expected to be the materials best suited for steam boiler and turbine applications above about 675 C. Specific alloys of interest include Haynes 230 and 282, Inconel 617, 625 and 740, and Nimonic 263. Further validation of a previously developed chromia evaporation model is shown by examining the reactive evaporation effects resulting from exposure of Haynes 230 and Haynes 282 to moist air environments as a function of flow rate and water content. These two alloys differ in Ti and Mn contents, which may form outer layers of TiO{sub 2} or Cr-Mn spinels. This would in theory decrease the evaporation of Cr{sub 2}O{sub 3} from the scale by decreasing the activity of chromia at the scale surface, and be somewhat self-correcting as chromia evaporation concentrates the Ti and Mn phases. The apparent approximate chromia activity was found for each condition and alloy that showed chromia evaporation kinetics. As expected, it was found that increasing the gas flow rate led to increased chromia evaporation and decreased chromia activity. However, increasing the water content in moist air increased the evaporation, but results were mixed with its effect on chromia activity.

  14. Repository Performance Confirmation - 12119

    SciTech Connect (OSTI)

    Hansen, F.D. [Sandia National Laboratories, Albuquerque, New Mexico 87185 (United States)

    2012-07-01

    Repository performance confirmation links the technical bases of repository science and societal acceptance. Among the countless aspects of monitoring, performance confirmation holds a special place, involving distinct activities combining technical and social significance in radioactive waste management. Discussion is divided into four themes: 1. A distinction is drawn between performance confirmation monitoring and other testing and monitoring objectives, 2. A case study illustrates confirmation activities integrated within a long-term testing and monitoring strategy for Yucca Mountain, 3. A case study reviews compliance monitoring developed and implemented for the Waste Isolation Pilot Plant, and 4. An approach for developing, evaluating and implementing the next generation of performance confirmation monitoring is presented. International interest in repository monitoring is exhibited by the European Commission Seventh Framework Programme 'Monitoring Developments for Safe Repository Operation and Staged Closure' (MoDeRn) Project. The MoDeRn partners are considering the role of monitoring in a phased approach to the geological disposal of radioactive waste. As repository plans advance in different countries, the need to consider monitoring strategies within a controlled framework has become more apparent. The MoDeRn project pulls together technical and societal experts to assimilate a common understanding of a process that could be followed to develop a monitoring program. Experience from two repository programs in the United States sheds light on how performance confirmation has been executed. Lessons learned can help the next generation of performance confirmation. (author)

  15. Repository performance confirmation.

    SciTech Connect (OSTI)

    Hansen, Francis D.

    2011-09-01

    Repository performance confirmation links the technical bases of repository science and societal acceptance. This paper explores the myriad aspects of what has been labeled performance confirmation in U.S. programs, which involves monitoring as a collection of distinct activities combining technical and social significance in radioactive waste management. This paper is divided into four parts: (1) A distinction is drawn between performance confirmation monitoring and other testing and monitoring objectives; (2) A case study illustrates confirmation activities integrated within a long-term testing and monitoring strategy for Yucca Mountain; (3) A case study reviews compliance monitoring developed and implemented for the Waste Isolation Pilot Plant; and (4) An approach for developing, evaluating and implementing the next generation of performance confirmation monitoring is presented. International interest in repository monitoring is exhibited by the European Commission Seventh Framework Programme 'Monitoring Developments for Safe Repository Operation and Staged Closure' (MoDeRn) Project. The MoDeRn partners are considering the role of monitoring in a phased approach to the geological disposal of radioactive waste. As repository plans advance in different countries, the need to consider monitoring strategies within a controlled framework has become more apparent. The MoDeRn project pulls together technical and societal experts to assimilate a common understanding of a process that could be followed to develop a monitoring program. A fundamental consideration is the differentiation of confirmation monitoring from the many other testing and monitoring activities. Recently, the license application for Yucca Mountain provided a case study including a technical process for meeting regulatory requirements to confirm repository performance as well as considerations related to the preservation of retrievability. The performance confirmation plan developed as part of the Yucca Mountain license application identified a broad suite of monitoring activities. A revision of the plan was expected to winnow the number of activities down to a manageable size. As a result, an objective process for the next stage of performance confirmation planning was developed as an integral part of an overarching long-term testing and monitoring strategy. The Waste Isolation Pilot Plant compliance monitoring program at once reflects its importance to stakeholders while demonstrating adequate understanding of relevant monitoring parameters. The compliance criteria were stated by regulation and are currently monitored as part of the regulatory rule for disposal. At the outset, the screening practice and parameter selection were not predicated on a direct or indirect correlation to system performance metrics, as was the case for Yucca Mountain. Later on, correlation to performance was established, and the Waste Isolation Pilot Plant continues to monitor ten parameters originally identified in the compliance certification documentation. The monitoring program has proven to be effective for the technical intentions and societal or public assurance. The experience with performance confirmation in the license application process for Yucca Mountain helped identify an objective, quantitative methodology for this purpose. Revision of the existing plan would be based on findings of the total system performance assessment. Identification and prioritization of confirmation activities would then derive from performance metrics associated with performance assessment. Given the understanding of repository performance confirmation, as reviewed in this paper, it is evident that the performance confirmation program for the Yucca Mountain project could be readily re-engaged if licensing activities resumed.

  16. Annual Performance Report FY 2012, Annual Performance Plan FY...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2, Annual Performance Plan FY 2013 & FY 2014 Annual Performance Report FY 2012, Annual Performance Plan FY 2013 & FY 2014 PDF icon Annual Performance Report and Plan FY12 FY13 FY14 ...

  17. Sandia Energy - High Performance Computing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    High Performance Computing Home Energy Research Advanced Scientific Computing Research (ASCR) High Performance Computing High Performance Computingcwdd2015-03-18T21:41:24+00:00...

  18. Development of Alternate Soil Clean-Up Goals for Hanford Waste Sites Using Fate and Transport Modeling

    SciTech Connect (OSTI)

    Hoover, J.D. [Fluor Hanford, Inc. (United States); McMahon, W.J. [CH2M Hill Hanford Group (United States); Leary, K.D. [DOE/RL (United States)

    2008-07-01

    Remedial Action Goals (RAGs) for soil contaminant levels that are protective of groundwater have been determined for the Removal/Treatment/Disposal (RTD) sites at the 200-UW-1 Operable Unit on the Hanford Site. The RAG values were determined using a methodology involving the back-calculation of soil contaminant levels protective of groundwater (i.e., resulting groundwater concentrations are {<=} MCLs) in conjunction with the fate and transport modeling as a risk-based alternative to the currently prescribed use of background or detection limit default values. This methodology is important for waste management activities at the Hanford Site because it provides risk-based metrics and a technical basis for determining the levels of contamination 'left in place' in the Hanford Site vadose zone that are protective of human health and the environment. The methodology and the use of fate and transport modeling described here comply with federal guidelines for the use of environmental models. This approach is also consistent with one of several allowable methods identified in State guidelines for deriving soil concentrations for ground water protection. Federal and state guidelines recommend the use of site-specific information and data in risk-based assessments of risk and/or protectiveness. The site-specific characteristics of the Hanford Site, which include consideration of the semi-arid climate, an unsaturated zone thickness of over 80 m (262 feet), and associated/other site features and processes, are integral for the risk-based assessments associated with the protection of groundwater pathway. This methodology yields soil cleanup values (RAGs) for the 200-UW-1 OU waste sites selected for the removal/treatment/disposal (RTD) remedy. These proposed RAGs for uranium, nitrate, and technetium-99 are derived from soil concentrations calculated not to cause contamination of groundwater at levels that exceed the ground water MCLs, and are 40 to 200 times greater than currently prescribed default values. The proposed RAG soil concentration values derive from the results of the fate and transport modeling for a reference volume of contaminated soil extending to a depth of 15 feet, and also for a depth extending from 15 feet to 30 feet. The site-specific parameters for the 200-UW-1 OU RTD waste sites used to calculate the proposed RAG values, and the fate and transport modeling are also described. The assessment of uncertainties, assumptions, and model limitations indicate that the model is capable of adequately representing the Hanford vadose zone system and that the estimated soil cleanup levels are conservatively biased toward over-estimation of groundwater impacts. The risk-based metrics provided by this methodology can potentially greatly reduce the amount of excavation needed at the hundreds of RTD waste sites, and also have significant implications for deeper vadose zone applications. These implications include an improved technical basis for remedy selection, decisions, characterization, and stakeholder communication and cost savings in the range of hundreds of millions of dollars. (authors)

  19. A1.5 Fusion Performance

    SciTech Connect (OSTI)

    Amendt, P

    2011-03-31

    Analysis and radiation hydrodynamics simulations for expected high-gain fusion target performance on a demonstration 1-GWe Laser Inertial Fusion Energy (LIFE) power plant in the mid-2030s timeframe are presented. The required laser energy driver is 2.2 MJ at a 0.351-{micro}m wavelength, and a fusion target gain greater than 60 at a repetition rate of 16 Hz is the design goal for economic and commercial attractiveness. A scaling-law analysis is developed to benchmark the design parameter space for hohlraum-driven central hot-spot ignition. A suite of integrated hohlraum simulations is presented to test the modeling assumptions and provide a basis for a near-term experimental resolution of the key physics uncertainties on the National Ignition Facility (NIF). The NIF is poised to demonstrate ignition by 2012 based on the central hot spot (CHS) mode of ignition and propagating thermonuclear burn [1]. This immediate prospect underscores the imperative and timeliness of advancing inertial fusion as a carbon-free, virtually limitless source of energy by the mid-21st century to substantially offset fossil fuel technologies. To this end, an intensive effort is underway to leverage success at the NIF and to provide the foundations for a prototype 'LIFE.1' engineering test facility by {approx}2025, followed by a commercially viable 'LIFE.2' demonstration power plant operating at 1 GWe by {approx}2035. The current design goal for LIFE.2 is to accommodate {approx}2.2 MJ of laser energy (entering the high-Z radiation enclosure or 'hohlraum') at a 0.351-{micro}m wavelength operating at a repetition rate of 16 Hz and to provide a fusion target yield of 132 MJ. To achieve this design goal first requires a '0-d' analytic gain model that allows convenient exploration of parameter space and target optimization. This step is then followed by 2- and 3-dimensional radiation-hydrodynamics simulations that incorporate laser beam transport, x-ray radiation transport, atomic physics, and thermonuclear burn [2]. These simulations form the basis for assessing the susceptibility to hydrodynamic instability growth, target performance margins, laser backscatter induced by plasma density fluctuations within the hohlraum, and the threat spectrum emerging from the igniting capsule, e.g., spectra, fluences and anisotropy of the x rays and ions, for input into the chamber survivability calculations. The simulations follow the guidelines of a 'point design' methodology, which formally designates a well-defined milestone in concept development that meets established criteria for experimental testing. In Section 2, the 0-d analytic gain model to survey gain versus laser energy parameter space is discussed. Section 3 looks at the status of integrated hohlraum simulations and the needed improvements in laser-hohlraum coupling efficiency to meet the LIFE.2 threshold (net) target gain of {approx}60. Section 4 considers advanced hohlraum designs to well exceed the LIFE.2 design goal for satisfactory performance margins. We summarize in Sec. 5.

  20. Internet Performance to Africa

    SciTech Connect (OSTI)

    Cottrell, L

    2003-10-01

    We report the first results ever for real-time Internet performance to Africa using the PingER methodology. Multiple monitoring hosts were used to enable comparisons with performance from different parts of the world. From these preliminary measurements, we have found that Internet packet losses to some African sites in recent months range from very poor to bad (> 12%), some getting better, others are holding steady or getting worse. This, together with the average monthly Round Trip Times, imply end-to-end maximum TCP throughputs that are order of magnitudes different between countries in the region. Africa is shown to be far from the Internet performance in industrialized nations due to the poor infrastructure in place today. These monitoring efforts can provide valuable information to analyze the relative rates of future improvement and today they help us to quantify the digital divide and can provide quantitative information to policy makers.

  1. Achieving Deeper Energy Savings in Federal Energy Performance Contracts

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Shonder, John A.; Nasseri, Cyrus

    2015-01-01

    Legislation requires each agency of the US federal government to reduce the aggregate energy use index of its buildings by 30% by 2015, with respect to a 2003 baseline. The declining availability of appropriated funding means that energy performance contracting will be key to achieving this goal. Historically however, energy performance contracts have been able to reduce energy use by only about 20% over baseline. Achieving 30% energy reductions using performance contracting will require new approaches and a specific focus on achieving higher energy savings, both by ESCOs and by agencies. This paper describes some of the ways federal agenciesmore » are meeting this challenge, and presents results from the efforts of one agency the US General Services Administration -- to achieve deeper energy savings in conventional energy savings performance contracts.« less

  2. Cost and Performance Assumptions for Modeling Electricity Generation Technologies

    SciTech Connect (OSTI)

    Tidball, Rick; Bluestein, Joel; Rodriguez, Nick; Knoke, Stu

    2010-11-01

    The goal of this project was to compare and contrast utility scale power plant characteristics used in data sets that support energy market models. Characteristics include both technology cost and technology performance projections to the year 2050. Cost parameters include installed capital costs and operation and maintenance (O&M) costs. Performance parameters include plant size, heat rate, capacity factor or availability factor, and plant lifetime. Conventional, renewable, and emerging electricity generating technologies were considered. Six data sets, each associated with a different model, were selected. Two of the data sets represent modeled results, not direct model inputs. These two data sets include cost and performance improvements that result from increased deployment as well as resulting capacity factors estimated from particular model runs; other data sets represent model input data. For the technologies contained in each data set, the levelized cost of energy (LCOE) was also evaluated, according to published cost, performance, and fuel assumptions.

  3. Achieving Deeper Energy Savings in Federal Energy Performance Contracts

    SciTech Connect (OSTI)

    Shonder, John A.; Nasseri, Cyrus

    2015-01-01

    Legislation requires each agency of the US federal government to reduce the aggregate energy use index of its buildings by 30% by 2015, with respect to a 2003 baseline. The declining availability of appropriated funding means that energy performance contracting will be key to achieving this goal. Historically however, energy performance contracts have been able to reduce energy use by only about 20% over baseline. Achieving 30% energy reductions using performance contracting will require new approaches and a specific focus on achieving higher energy savings, both by ESCOs and by agencies. This paper describes some of the ways federal agencies are meeting this challenge, and presents results from the efforts of one agency the US General Services Administration -- to achieve deeper energy savings in conventional energy savings performance contracts.

  4. Used Nuclear Fuel Loading and Structural Performance Under Normal Conditions of Transport- Demonstration of Approach and Results on Used Fuel Performance Characterization

    SciTech Connect (OSTI)

    Adkins, Harold; Geelhood, Ken; Koeppel, Brian; Coleman, Justin; Bignell, John; Flores, Gregg; Wang, Jy-An; Sanborn, Scott; Spears, Robert; Klymyshyn, Nick

    2013-09-30

    This document addresses Oak Ridge National Laboratory milestone M2FT-13OR0822015 Demonstration of Approach and Results on Used Nuclear Fuel Performance Characterization. This report provides results of the initial demonstration of the modeling capability developed to perform preliminary deterministic evaluations of moderate-to-high burnup used nuclear fuel (UNF) mechanical performance under normal conditions of storage (NCS) and normal conditions of transport (NCT) conditions. This report also provides results from the sensitivity studies that have been performed. Finally, discussion on the long-term goals and objectives of this initiative are provided.

  5. Single Cell and Metagenomic Assemblies: Biology Drives Technical Choices and Goals (Metagenomics Informatics Challenges Workshop: 10K Genomes at a Time)

    ScienceCinema (OSTI)

    Stepanauskas, Ramunas [Bigelow Laboratory

    2013-01-22

    DOE JGI's Tanja Woyke, chair of the Single Cells and Metagenomes session, delivers an introduction, followed by Bigelow Laboratory's Ramunas Stepanauskas on "Single Cell and Metagenomic Assemblies: Biology Drives Technical Choices and Goals" at the Metagenomics Informatics Challenges Workshop held at the DOE JGI on October 12-13, 2011.

  6. Contractor Past Performance Information

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -----------------------------------------------------------------Chapter 7.2 (May 2014) 1 Strategic Sourcing Requirements Guiding Principles  Improving acquisition through strategic sourcing.  Taking advantage of purchasing opportunities by continually reviewing current needs against market conditions.  Requiring vendors to provide sufficient pricing usage, and performance data to enable the government to ensure we are receiving the best prices for commonly used goods and services. 

  7. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 ... 4.01 3.89 4.02 4.12 4.22 First Aid Monthly First Aid 12-Month Average FY ... Performance Report JUL 2013 DOERL-2009-113 Rev 46 ...

  8. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... 0.0 22.4 0.0 22.4 RL-0040 Reliability ... 77 11 Table 3-4. First Aid Case Rate MSC Monthly Performance Report FEB 2016 DOERL-2009-113 ... the baseline for FY 2013, FY 2014, FY 2015, ...

  9. Performance and Optimization

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Optimization Performance and Optimization Running Jobs Efficiently This page defines job efficiency and how to measure the efficiency of your jobs. Read More » PDSF IO Monitoring Plots of continuous IO monitoring for the eliza file systems and project. Read More » Last edited: 2016-04-29 11:35:20

  10. Annual Performance Report

    Office of Legacy Management (LM)

    3 Through March 2014 for the Shiprock, New Mexico, Site October 2014 LMS/SHP/S12021 This page intentionally left blank U.S. Department of Energy Annual Performance Report, Shiprock, New Mexico October 2014 Doc. No. S12021 Page i Contents Abbreviations ................................................................................................................................. iii Executive Summary

  11. Annual Performance Report

    Office of Legacy Management (LM)

    4 Through March 2015 for the Shiprock, New Mexico, Site August 2015 LMS/SHP/S13080 This page intentionally left blank U.S. Department of Energy Annual Performance Report, Shiprock, New Mexico August 2015 Doc. No. S13080 Page i Contents Abbreviations ................................................................................................................................. iii Executive Summary

  12. High Performance Window Retrofit

    SciTech Connect (OSTI)

    Shrestha, Som S; Hun, Diana E; Desjarlais, Andre Omer

    2013-12-01

    The US Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) and Traco partnered to develop high-performance windows for commercial building that are cost-effective. The main performance requirement for these windows was that they needed to have an R-value of at least 5 ft2 F h/Btu. This project seeks to quantify the potential energy savings from installing these windows in commercial buildings that are at least 20 years old. To this end, we are conducting evaluations at a two-story test facility that is representative of a commercial building from the 1980s, and are gathering measurements on the performance of its windows before and after double-pane, clear-glazed units are upgraded with R5 windows. Additionally, we will use these data to calibrate EnergyPlus models that we will allow us to extrapolate results to other climates. Findings from this project will provide empirical data on the benefits from high-performance windows, which will help promote their adoption in new and existing commercial buildings. This report describes the experimental setup, and includes some of the field and simulation results.

  13. MCNP Progress & Performance Improvements

    SciTech Connect (OSTI)

    Brown, Forrest B.; Bull, Jeffrey S.; Rising, Michael Evan

    2015-04-14

    Twenty-eight slides give information about the work of the US DOE/NNSA Nuclear Criticality Safety Program on MCNP6 under the following headings: MCNP6.1.1 Release, with ENDF/B-VII.1; Verification/Validation; User Support & Training; Performance Improvements; and Work in Progress. Whisper methodology will be incorporated into the code, and run speed should be increased.

  14. High Performance Sustainable Building

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-06-20

    The guide supports DOE O 413.3A and provides useful information on the incorporation of high performance sustainable building principles into building-related General Plant Projects and Institutional General Plant Projects at DOE sites. Canceled by DOE G 413.3-6A. Does not cancel other directives.

  15. Program predicts waterflooding performance

    SciTech Connect (OSTI)

    Fassihi, M.R.; O'Brien, W.J.

    1987-04-01

    Water is a handheld calculator program for estimating waterflooding performance in a multilayered oil reservoir for patterns such as five-spot, direct line drive and staggered line drive. Topics considered in this paper include oil wells, sweep efficiency, well stimulation, computer calculations, stratification, enhanced recovery, calculators, reservoir rock, and reservoir engineering.

  16. High performance systems

    SciTech Connect (OSTI)

    Vigil, M.B.

    1995-03-01

    This document provides a written compilation of the presentations and viewgraphs from the 1994 Conference on High Speed Computing given at the High Speed Computing Conference, {open_quotes}High Performance Systems,{close_quotes} held at Gleneden Beach, Oregon, on April 18 through 21, 1994.

  17. Performance Analysis for Mixing Pumps in Tank 18

    SciTech Connect (OSTI)

    Lee, S.Y.

    2002-04-16

    In support of sludge suspension and mixing operations in Tank 18, flow evolution models were developed and performance calculations completed for the advanced design mixer pump (ADMP) and the modified ADMP (MADMP). The MADMP was being considered as a replacement for the ADMP in Tank 18. The models and calculations were based on prototypic tank geometry and expected normal operating conditions as defined by Waste Removal Closure (WRC) Engineering. Computational fluid dynamics models of both the TNX full tank experimental facility and Tank 18 were developed using the FLUENT(tm) code. TNX test data were used to benchmark the models and assess the efficiency of sludge suspension and removal operations in the 85 ft tank. The models employed a three-dimensional approach, a two-equation turbulence model, and a stepped-rotation approximation to estimate pump rotation effects. A two-dimensional approach was also used as a scoping analysis to examine multi-dimensional effects of fluid motion on the flow circulation patterns in the tank. The results were verified by both TNX test data and literature data. Local velocity was used as a measure of slurrying and mixing capability. The results showed that normal operations in Tank 18 with the existing ADMP mixer and a 70 inch liquid level provide adequate sludge removal in most regions of the tank. The exception is the region within about 2 ft of the wall, assuming the minimum velocity required to suspend waste sludge is 2.27 ft/sec. Further results showed that the time to reach a steady-state flow pattern was affected by both pump rotation and pump location. Sensitivity studies showed that a higher tank level and the smaller nozzle size would result in better performance in suspending and removing the sludge. The results also showed that the MADMP mixer has the best sludge removal capacity. Computational results for two different fluids, water and a typical slurry, showed that the maximum clearing distance was not sensiti ve to the slurry fluid properties.

  18. Annual Performance Report FY 2005 Annual Performance Plan FY 2006 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 5 Annual Performance Plan FY 2006 Annual Performance Report FY 2005 Annual Performance Plan FY 2006 Annual Performance Report FY 2005 Annual Performance Plan FY 2006 PDF icon Annual Performance Report FY 2005 Annual Performance Plan FY 2006 More Documents & Publications U.S. Department of Energy 2006 Annual Report FTCP Annual Plan - Fiscal Year 2005 FY 2008 E-Government Act Report

  19. Carbon molecular sieve membranes on porous composite tubular supports for high performance gas separations

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Lee, Pyung -Soo; Bhave, Ramesh R.; Nam, Seung -Eun; Kim, Daejin

    2016-01-11

    Thin carbon molecular sieve membranes (<500 nm) were fabricated inside of long geometry (9 inch) of stainless steel tubes with all welded construction. Alumina intermediate layer on porous stainless steel tube support was used to reduce effective support pore size and to provide a more uniform surface roughness. Novolac phenolic resin solution was then coated on the inside of porous stainless steel tube by slip casting while their viscosities were controlled from 5 centipoises to 30 centipoises. Carbonization was carried out at 700 °C in which thermal stress was minimized and high quality carbon films were prepared. The highest separationmore » performance characteristics were obtained using 20 cP phenolic resin solutions. The fabricated CMSM showed good separation factor for He/N2 462, CO2/N2 97, and O2/N2 15.4. As the viscosity of polymer precursor solution was reduced from 20 cP to 15 cP, gas permeance values almost doubled with somewhat lower separation factor He/N2 156, CO2/N2 88, and O2/N2 7.7.« less

  20. Underhood Thermal Performance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Underhood Thermal Performance This email address is being protected from spambots. You need JavaScript enabled to view it. - Computational Fluid Dynamics Project Leader Background As vehicle technology advances, automakers need a better understanding of underhood heat loads, especially as they relate to emissions and fuel efficiency. Manufacturers of heavy-duty vehicles and off-road machines have similar concerns. Ineffective underhood thermal management can lead to higher emissions, reduced

  1. Roadside Hardware Performance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Roadside Hardware Safety Performance Background Roadside hardware, such as traffic and work zone barriers, bridge railings, and crash cushions, prevent vehicles from leaving the road at dangerous locations. Crash testing of a large variety of vehicles into this hardware, as a means of optimizing the hardware design, is extremely expensive, often costing approximately $500,000 and 10,000 person-hours per test. The increasing diversity of automobiles and trucks, as well as the advent of the next

  2. High Performance Window Attachments

    Energy Savers [EERE]

    High Performance Window Attachments D. Charlie Curcija Lawrence Berkeley National Laboratory dccurcija@lbl.gov 510-495-2602 April 4, 2013 2 | Building Technologies Office eere.energy.gov Purpose & Objectives Impact of Project: * Motivate manufacturers to make improvements in Window systems U-Factors, SHGC and daylighting utilization * Increase awareness of benefits from energy efficient window attachments Problem Statement: * A wide range of residential window attachments are available, but

  3. Photovoltaic System Performance

    Energy Science and Technology Software Center (OSTI)

    1989-09-25

    PVFORM4.0 is used to design a photovoltaic (PV) system using a set of design parameters which optimize the system's economic potential for the proposed location and the expected operating conditions. PVFORM3.3 has been used to determine PV system size and optimum mounting configuration. The anticipated electrical load determines the system size and the weather and the mounting configuration affect the system output. PVFORM4.0 uses program-supplied default values or their user-supplied equivalents for each of amore » large number of parameters describing the system and time-series data describing the environment to perform a series of hourly calculations to simulate the physical (photovoltaic) performance of a PV system for a one-year period. These iterative calculations sample the performance of the PV system throughout a simulated 365-day year of system operation. Within any simulated day on which system performance is sampled, the calculations are done hourly. The number of days sampled and the interval between them is determined by an input parameter. The results of these calculations are summarized on a monthly basis in output tables and an optional plot file. The program is applicable to grid interactive or stand-alone flat-plate systems. The grid interactive system is assumed to use power purchased from a local utility to supply that portion of the load not met by the simulated PV array. If the array produces more energy than can be consumed by the load, the excess energy is assumed to be sold back to the utility at a constant energy sellback price. If a stand-alone system is being modeled, the program assumes that all energy produced by the simulated PV array is first applied to the external load, and any excess is then used to charge the battery bank. Energy not consumed by the load or the batteries is considered to be wasted.« less

  4. PV Performance and Reliability

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance and Reliability - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs

  5. Performance and Debugging Tools

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tools Performance and Debugging Tools NERSC provides many popular debugging and profiling tools. Some of them are general-purpose tools and others are geared toward more specific tasks. A quick guideline on when to use which debugging tool is as follows: DDT and TotalView: general purpose parallel debuggers allowing users to interactively control the pace of execution of a program using a graphical user interface gdb: serial command line mode debugger; can be useful in quickly examining core

  6. Past Performance Questionnaire

    National Nuclear Security Administration (NNSA)

    The contractor should have provided you with a copy of a completed Relevant Corporate Experience Form for your contract so that you may more readily identify the contract in question and verify the accuracy of information provided therein. Please return the questionnaire to the DOE/NNSA by March 6, 2016 (see pages 3 & 4 for method of submittal) I. CONTRACT INFORMATION 1. This questionnaire relates to work performed by (Name of Contractor/Company/Division - do not use acronyms):

  7. Past Performance Questionnaire

    National Nuclear Security Administration (NNSA)

    Contract Value: Initial Amount Current or Final Amount* Estimated Cost $ $ Fixed Price $ $ Fee/Profit $ $ Total Value $ $ *Should reflect any contract value increases/decreases since initial contract award II. PAST PERFORMANCE EVALUATION Please rate the Contractor as "Excellent" (E), "Good" (G), "Satisfactory" (S), "Unsatisfactory" (U), or "Not Applicable" (N/A) in the following areas: A. QUALITY OF PRODUCT OR SERVICES 1. Quality of product

  8. High Performance Buildings Database

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    The High Performance Buildings Database is a shared resource for the building industry, a unique central repository of in-depth information and data on high-performance, green building projects across the United States and abroad. The database includes information on the energy use, environmental performance, design process, finances, and other aspects of each project. Members of the design and construction teams are listed, as are sources for additional information. In total, up to twelve screens of detailed information are provided for each project profile. Projects range in size from small single-family homes or tenant fit-outs within buildings to large commercial and institutional buildings and even entire campuses. The database is a data repository as well. A series of Web-based data-entry templates allows anyone to enter information about a building project into the database. Once a project has been submitted, each of the partner organizations can review the entry and choose whether or not to publish that particular project on its own Web site.

  9. Fibrous Fillers to Manufacture Ultra-High Ash/Performance Paper

    Broader source: Energy.gov [DOE]

    This factsheet describes a research project whose goal is to demonstrate the economic and technological viability of fibrous filler to manufacture paper containing up to 50% ash, at equal or better quality and performance than conventional alternatives and at a lower cost.

  10. Moab Project Contractor Scores 'Very Good' on Fiscal Year 2015 Performance

    Broader source: Energy.gov [DOE]

    MOAB, Utah – Portage, Inc., the remedial action contractor for EM’s Moab Uranium Mill Tailings Remedial Action Project, met the majority of its performance goals in fiscal year 2015, earning $1,255,640, or 84 percent, of a potential award fee amount of $1,494,810 and an overall weighted result of “very good.”

  11. Developing an Energy Performance Modeling Startup Kit

    SciTech Connect (OSTI)

    Wood, A.

    2012-10-01

    In 2011, the NAHB Research Center began the first part of the multi-year effort by assessing the needs and motivations of residential remodelers regarding energy performance remodeling. The scope is multifaceted - all perspectives will be sought related to remodeling firms ranging in size from small-scale, sole proprietor to national. This will allow the Research Center to gain a deeper understanding of the remodeling and energy retrofit business and the needs of contractors when offering energy upgrade services. To determine the gaps and the motivation for energy performance remodeling, the NAHB Research Center conducted (1) an initial series of focus groups with remodelers at the 2011 International Builders' Show, (2) a second series of focus groups with remodelers at the NAHB Research Center in conjunction with the NAHB Spring Board meeting in DC, and (3) quantitative market research with remodelers based on the findings from the focus groups. The goal was threefold, to: Understand the current remodeling industry and the role of energy efficiency; Identify the gaps and barriers to adding energy efficiency into remodeling; and Quantify and prioritize the support needs of professional remodelers to increase sales and projects involving improving home energy efficiency. This report outlines all three of these tasks with remodelers.

  12. Guidance for performing preliminary assessments under CERCLA

    SciTech Connect (OSTI)

    1991-09-01

    EPA headquarters and a national site assessment workgroup produced this guidance for Regional, State, and contractor staff who manage or perform preliminary assessments (PAs). EPA has focused this guidance on the types of sites and site conditions most commonly encountered. The PA approach described in this guidance is generally applicable to a wide variety of sites. However, because of the variability among sites, the amount of information available, and the level of investigative effort required, it is not possible to provide guidance that is equally applicable to all sites. PA investigators should recognize this and be aware that variation from this guidance may be necessary for some sites, particularly for PAs performed at Federal facilities, PAs conducted under EPA`s Environmental Priorities Initiative (EPI), and PAs at sites that have previously been extensively investigated by EPA or others. The purpose of this guidance is to provide instructions for conducting a PA and reporting results. This guidance discusses the information required to evaluate a site and how to obtain it, how to score a site, and reporting requirements. This document also provides guidelines and instruction on PA evaluation, scoring, and the use of standard PA scoresheets. The overall goal of this guidance is to assist PA investigators in conducting high-quality assessments that result in correct site screening or further action recommendations on a nationally consistent basis.

  13. Annual Performance Report FY 2010 Annual Performance Plan FY...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 Annual Performance Plan FY 2011 Annual Performance Report FY 2010 Annual Performance Plan FY 2011 I am pleased to submit the Office of Inspector General's combined Fiscal Year ...

  14. Integration of the EM Corporate QA Performance Metrics With Performance

    Energy Savers [EERE]

    Analysis Process | Department of Energy the EM Corporate QA Performance Metrics With Performance Analysis Process Integration of the EM Corporate QA Performance Metrics With Performance Analysis Process August 2009 Presenter: Robert Hinds, Savannah River Remediation, LLC Track 9-12 Topics Covered: Implementing CPMS for QA Corporate QA Performance Metrics Contractor Performance Analysis Contractor Assessment Programs Assessment Program Structure CPMS Integration with P/A Process Validating

  15. PERFORMANCE OBJECTIVES FOR TANK FARM CLOSURE PERFORMANCE ASSESSMENTS

    SciTech Connect (OSTI)

    MANN, F.M.; CRUMPLER, J.D.

    2005-09-30

    This report documents the performance objectives (metrics, times of analyses, and times of compliance) to be used in performance assessments of Hanford Site tank farm closure.

  16. Energy Performance Score Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PERFORMANCE SCORE $787 10.7 tons/yr 43,000 kWhe/yr Reference Number: Electric: Natural Gas: Electric: Natural Gas: Carbon Carbon Score Energy Score *See Recommended Upgrades *See Recommended Upgrades †With energy from renewable sources This score measures the estimated total energy use (electricity, natural gas, propane, heating oil) of this home for one year. The lower the score, the less energy required for normal use. Actual consumption and costs may vary. Measured in kilowatt hours per

  17. Appendix PA: Performance Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for the Waste Isolation Pilot Plant Appendix PA-2014 Performance Assessment United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico Compliance Recertification Application 2014 Appendix PA Table of Contents PA-1.0 Introduction PA-1.1 Changes since the CRA-2009 PA PA-1.1.1 Replacement of Option D with the ROMPCS PA-1.1.2 Additional Mined Volume in the Repository North End PA-1.1.3 Refinement to the Probability of Encountering Pressurized Brine

  18. U.S. Department of Energy 2012 Strategic Sustainability Performance Plan

    Energy Savers [EERE]

    and Office of Management and Budget U.S. Department of ENERGY United States Department of Energy Washington, DC 20585 2012 Strategic Sustainability Performance Plan Report to The White House Council on Environmental Quality 2012 Strategic Sustainability Performance Plan Contents Main Document - Policy Statement - Executive Summary - Size and Scope of Agency Operations - Goal Analysis Appendix A - Climate Change Adaptation Plan Appendix B - Fleet Management Plan Appendix C - Biobased Purchasing

  19. Planning and Reporting for Operations and Maintenance in Federal Energy Savings Performance Contracts

    Broader source: Energy.gov [DOE]

    Document provides guidance on energy savings performance contract (ESPC) project development for allocating operations and maintenance (O&M) and repair and replacement (R&R) responsibilities and putting in place O&M reporting requirements. The goal is to minimize disagreements between federal agencies and energy service companies (ESCOs) over O&M and R&R and to help ensure that savings persist during performance period.

  20. Performance evaluation of two emerging media processors: VIRAM and imagine

    SciTech Connect (OSTI)

    Oliker, Leonid; Duell, Jason; Narayanan, Manikandan; Chatterji, Sourav

    2003-01-01

    This work presents two emerging media microprocessors, VIRAM and Imagine, and compares the implementation strategies and performance results of these unique architectures. VIRAM is a complete system on a chip which uses PIM technology to combine vector processing with embedded DRAM. Imagine is a programmable streaming architecture with a specialized memory hierarchy designed for computationally intensive data-parallel codes. First, we present a simple and effective approach for understanding and optimizing vector/stream applications. Performance results are then presented from a number of multimedia benchmarks and a computationally intensive scientific kernel. We explore the complex interact ions between programming paradigms, the architectural support at the ISA lever and the underlying microarchitecture of these two systems. Our long term goal is to evaluate leading media microprocessors as possible building blocks for future high performance systems.

  1. The challenge of performing safer coiled tubing operations

    SciTech Connect (OSTI)

    Van Adrichem, W.P.; Dowell, S.; Godsman, J.M.

    1996-12-31

    The substantial growth in coiled tubing services over the past several years has increased both the frequency of lost time injuries and potential for job execution related incidents. As the industry realizes the additional benefits of coiled tubing e.g. well intervention under pressure, efficiency, selective placement of fluids down hole and drilling, it is obvious that pipe size has, and will continue to increase. Pipe size has increased from a modest 1 {1/4} inches outside diameter ten years ago to outside diameters in excess of 2 7/8 inch being used on a regular basis today. In addition the development of programs to predict pipe fatigue and down hole stresses have encouraged operators to become more confident with the service.

  2. Performance Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SENIOR PROFESSIONAL (SP) PERFORMANCE APPRAISAL CYCLE - CLOSEOUT GUIDANCE The FY 2015 ... June 5, 2015 SES Performance Management System Policy and Operating Procedures The SES ...

  3. World Record White OLED Performance Exceeds 100 lm/W

    Broader source: Energy.gov [DOE]

    Universal Display Corporation (UDC) has successfully demonstrated a record-breaking white organic light-emitting diode (WOLED) with a power efficacy of 102 lm/W at 1000 cd/m2 using its proprietary, high-efficiency phosphorescent OLED technology. This achievement represents a significant milestone for OLED technology, demonstrating performance that surpasses the power efficacy of incandescent bulbs with less than 15 lm/W and fluorescent lamps at 60-90 lm/W. Funded in part by DOE, UDC's achievement is a major step toward DOE's roadmap goal of a 150 lm/W commercial OLED light source by 2015.

  4. Wynkoop Building Performance Measurement: Water

    SciTech Connect (OSTI)

    Fowler, Kimberly M.; Kora, Angela R.

    2012-08-26

    This report is a summary of the water analysis performance for the Denver, Colorado Wynkoop Building. The Wynkoop Building (Figure 1) was built in 2006 as the Environmental Protection Agency (EPA) Region 8 Headquarters intended to house over 900 occupants in the 301,292 gross square feet (248,849 rentable square feet). The building was built on a brownfield in the Lower Downtown Historic District as part of an urban redevelopment effort. The building was designed and constructed through a public-private partnership with the sustainable design elements developed jointly by General Services Administration (GSA) and EPA. That partnership is still active with all parties still engaged to optimize building operations and use the building as a Learning Laboratory. The building design achieved U.S. Green Building Council Leadership in Energy and Environmental Design for New Construction (LEED-NC) Gold Certification in 2008 (Figure 2) and a 2008 EPA Energy Star Rating of 96 with design highlights that include: (1) Water use was designed to use 40% less than a typical design baseline. The design included low flow fixtures, waterless urinals and dual flush toilets; (2) Native and adaptive vegetation were selected to minimize the need for irrigation water for landscaping; and (3) Energy use intensity was modeled at 66.1 kBtus/gross square foot, which is 39% better than ASHRAE 90.1 1999. The Wynkoop Building water use (10 gallons/square foot) was measured at lower than industry average (15 gallons/square foot) and GSA goals (13 gallons/square foot), however, it was higher than building management expected it would be. The type of occupants and number of occupants can have a significant impact on fixture water use. The occupancy per floor varied significantly over the study time period, which added uncertainty to the data analysis. Investigation of the fixture use on the 2nd, 5th, and 7th floors identified potential for water use reduction if the flush direction of the dual-flush toilet handles was reversed. The building management retrofitted the building's toilets with handles that operated on reduced flush when pushed down (0.8 gallons) and full flush when pulled up (1.1 gallons). The water pressure on the 5th floor (< 30 psi) is less than half the pressure on the 7th floor (>80 psi). The measured water savings post-retrofit was lower on the 5th floor than the 7th floor. The differences in water pressure may have had an impact on the quantity of water used per floor. The second floor water use was examined prior to and following the toilet fixture retrofit. This floor is where conference rooms for non-building occupants are available for use, thus occupancy is highly variable. The 3-day average volume per flush event was higher post-retrofit (0.79 gallons per event), in contrast to pre-retrofit (0.57 gallons per event). There were 40% more flush events post retrofit, which impacted the findings. Water use in the third floor fitness center was also measured for a limited number of days. Because of water line accessibility, only water use on the men's side of the fitness center was measured and from that the total fitness center water use was estimated. Using the limited data collected, the fitness center shower water use is approximately 2% of the whole building water use. Overall water use in the Wynkoop Building is below the industry baseline and GSA expectations. The dual flush fixture replacement appears to have resulted in additional water savings that are expected to show a savings in the total annual water use.

  5. High-performance steels

    SciTech Connect (OSTI)

    Barsom, J.M.

    1996-03-01

    Steel is the material of choice in structures such as storage tanks, gas and oil distribution pipelines, high-rise buildings, and bridges because of its strength, ductility, and fracture toughness, as well as its repairability and recyclability. Furthermore, these properties are continually being improved via advances in steelmaking, casting, rolling, and chemistry. Developments in steelmaking have led to alloys having low sulfur, sulfide shape control, and low hydrogen. They provide reduced chemical segregation, higher fracture toughness, better through-thickness and weld heat-affected zone properties, and lower susceptibility to hydrogen cracking. Processing has moved beyond traditional practices to designed combinations of controlled rolling and cooling known as thermomechanical control processes (TMCP). In fact, chemical composition control and TMCP now enable such precise adjustment of final properties that these alloys are now known as high-performance steels (HPS), engineered materials having properties tailored for specific applications.

  6. Fermilab | Directorate | Office of Integrated Planning & Performance...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    In addition it develops, implements and maintains integrated laboratory systems and management processes for strategic planning and goal setting, project and program...

  7. Superior Energy Performance Overview Slides

    Broader source: Energy.gov [DOE]

    This presentation provides a comprehensive overview of the Superior Energy Performance (SEP) program.

  8. High Performance Network Monitoring

    SciTech Connect (OSTI)

    Martinez, Jesse E

    2012-08-10

    Network Monitoring requires a substantial use of data and error analysis to overcome issues with clusters. Zenoss and Splunk help to monitor system log messages that are reporting issues about the clusters to monitoring services. Infiniband infrastructure on a number of clusters upgraded to ibmon2. ibmon2 requires different filters to report errors to system administrators. Focus for this summer is to: (1) Implement ibmon2 filters on monitoring boxes to report system errors to system administrators using Zenoss and Splunk; (2) Modify and improve scripts for monitoring and administrative usage; (3) Learn more about networks including services and maintenance for high performance computing systems; and (4) Gain a life experience working with professionals under real world situations. Filters were created to account for clusters running ibmon2 v1.0.0-1 10 Filters currently implemented for ibmon2 using Python. Filters look for threshold of port counters. Over certain counts, filters report errors to on-call system administrators and modifies grid to show local host with issue.

  9. Performance Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment Performance Assessment Performance Assessment The Office of Project Management Oversight and Assessments (PM) provides a monthly assessment of DOE's portfolio of capital assets projects, which is summarized in the monthly Project Dashboard report. The current portfolio consists of 34 active projects with established scope, schedule, and cost performance baselines. Based on current performance, projects that are expected to meet their performance baseline are assessed as GREEN,

  10. SCENARIOS FOR MEETING CALIFORNIA'S 2050 CLIMATE GOALS California's Carbon Challenge Phase II Volume I: Non-Electricity Sectors and Overall Scenario Results

    SciTech Connect (OSTI)

    Wei, Max; Greenblatt, Jeffrey; Donovan, Sally; Nelson, James; Mileva, Ana; Johnston, Josiah; Kammen, Daniel

    2014-06-01

    This study provides an updated analysis of long-term energy system scenarios for California consistent with the State meeting its 2050 climate goal, including detailed analysis and assessment of electricity system build-out, operation, and costs across the Western Electricity Coordinating Council (WECC) region. Four key elements are found to be critical for the State to achieve its 2050 goal of 80 percent greenhouse (GHG) reductions from the 1990 level: aggressive energy efficiency; clean electricity; widespread electrification of passenger vehicles, building heating, and industry heating; and large-scale production of low-carbon footprint biofuels to largely replace petroleum-based liquid fuels. The approach taken here is that technically achievable energy efficiency measures are assumed to be achieved by 2050 and aggregated with the other key elements mentioned above to estimate resultant emissions in 2050. The energy and non-energy sectors are each assumed to have the objective of meeting an 80 percent reduction from their respective 1990 GHG levels for the purposes of analysis. A different partitioning of energy and non-energy sector GHG greenhouse reductions is allowed if emission reductions in one sector are more economic or technically achievable than in the other. Similarly, within the energy or non-energy sectors, greater or less than 80 percent reduction from 1990 is allowed for sub-sectors within the energy or non-energy sectors as long as the overall target is achieved. Overall emissions for the key economy-wide scenarios are considered in this report. All scenarios are compliant or nearly compliant with the 2050 goal. This finding suggests that multiple technical pathways exist to achieve the target with aggressive policy support and continued technology development of largely existing technologies.

  11. Dependence of Achievable Plan Quality on Treatment Technique and Planning Goal Refinement: A Head-and-Neck Intensity Modulated Radiation Therapy Application

    SciTech Connect (OSTI)

    Qi, X. Sharon Ruan, Dan; Lee, Steve P.; Pham, Andrew; Kupelian, Patrick; Low, Daniel A.; Steinberg, Michael; Demarco, John

    2015-03-15

    Purpose: To develop a practical workflow for retrospectively analyzing target and normal tissue dose–volume endpoints for various intensity modulated radiation therapy (IMRT) delivery techniques; to develop technique-specific planning goals to improve plan consistency and quality when feasible. Methods and Materials: A total of 165 consecutive head-and-neck patients from our patient registry were selected and retrospectively analyzed. All IMRT plans were generated using the same dose–volume guidelines for TomoTherapy (Tomo, Accuray), TrueBeam (TB, Varian) using fixed-field IMRT (TB-IMRT) or RAPIDARC (TB-RAPIDARC), or Siemens Oncor (Siemens-IMRT, Siemens). A MATLAB-based dose–volume extraction and analysis tool was developed to export dosimetric endpoints for each patient. With a fair stratification of patient cohort, the variation of achieved dosimetric endpoints was analyzed among different treatment techniques. Upon identification of statistically significant variations, technique-specific planning goals were derived from dynamically accumulated institutional data. Results: Retrospective analysis showed that although all techniques yielded comparable target coverage, the doses to the critical structures differed. The maximum cord doses were 34.1 ± 2.6, 42.7 ± 2.1, 43.3 ± 2.0, and 45.1 ± 1.6 Gy for Tomo, TB-IMRT, TB-RAPIDARC, and Siemens-IMRT plans, respectively. Analyses of variance showed significant differences for the maximum cord doses but no significant differences for other selected structures among the investigated IMRT delivery techniques. Subsequently, a refined technique-specific dose–volume guideline for maximum cord dose was derived at a confidence level of 95%. The dosimetric plans that failed the refined technique-specific planning goals were reoptimized according to the refined constraints. We observed better cord sparing with minimal variations for the target coverage and other organ at risk sparing for the Tomo cases, and higher parotid doses for C-arm linear accelerator–based IMRT and RAPIDARC plans. Conclusion: Patient registry–based processes allowed easy and systematic dosimetric assessment of treatment plan quality and consistency. Our analysis revealed the dependence of certain dosimetric endpoints on the treatment techniques. Technique-specific refinement of planning goals may lead to improvement in plan consistency and plan quality.

  12. FEMA Emergency Management Performance Grant Program

    Broader source: Energy.gov [DOE]

    The Emergency Management Performance Grant (EMPG) Program provides federal funds to assist state, local, tribal and territorial governments in preparing for all hazards, as authorized by Section 662 of the Post Katrina Emergency Management Reform Act (6 U.S.C. sect. 762) and the Robert T. Stafford Disaster Relief and Emergency Assistance Act, as amended (42 U.S.C. sect. 5121 et seq.). Title VI of the Stafford Act authorizes FEMA to make grants for the purpose of providing a system of emergency preparedness for the protection of life and property in the United States from hazards and to vest responsibility for emergency preparedness jointly in the federal government and the states and their political subdivisions. The FY 2015 EMPG will provide federal funds to assist state, local, tribal and territorial emergency management agencies to obtain the resources required to support the National Preparedness Goal's (NPG's) associated mission areas and core capabilities. The federal government, through the EMPG Program, provides necessary direction, coordination, and guidance, and provides necessary assistance, as authorized in this title, to support a comprehensive all hazards emergency preparedness system.

  13. Knowledge-Based Parallel Performance Technology for Scientific Application Competitiveness Final Report

    SciTech Connect (OSTI)

    Malony, Allen D; Shende, Sameer

    2011-08-15

    The primary goal of the University of Oregon's DOE "œcompetitiveness" project was to create performance technology that embodies and supports knowledge of performance data, analysis, and diagnosis in parallel performance problem solving. The target of our development activities was the TAU Performance System and the technology accomplishments reported in this and prior reports have all been incorporated in the TAU open software distribution. In addition, the project has been committed to maintaining strong interactions with the DOE SciDAC Performance Engineering Research Institute (PERI) and Center for Technology for Advanced Scientific Component Software (TASCS). This collaboration has proved valuable for translation of our knowledge-based performance techniques to parallel application development and performance engineering practice. Our outreach has also extended to the DOE Advanced CompuTational Software (ACTS) collection and project. Throughout the project we have participated in the PERI and TASCS meetings, as well as the ACTS annual workshops.

  14. NERSC-GoalsProcess.pptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Logistics: Schedule * Agenda on workshop web page - http:www.nersc.govprojects... all; roundtable - Logistics: Templates * Web templates: web "Reference Material" - Based ...

  15. Aligning Incentives With Program Goals

    Broader source: Energy.gov [DOE]

    Presents techniques used by Michigan Saves to increase participation and provide greater incentives.

  16. goals | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure ...

  17. DOE-Sponsored Research Improves Gas Turbine Performance

    Broader source: Energy.gov [DOE]

    Small Business Innovative Research Grants Achieve Commercialization Goals for Novel Gas Turbine Manufacturing Technology

  18. Total System Performance Assessment - License Application Methods and Approach

    SciTech Connect (OSTI)

    J. McNeish

    2003-12-08

    ''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issues (KTIs) identified in agreements with the U.S. Nuclear Regulatory Commission, the ''Yucca Mountain Review Plan'' (YMRP), ''Final Report'' (NRC 2003 [163274]), and the NRC final rule 10 CFR Part 63 (NRC 2002 [156605]). This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are used in this document.

  19. Total System Performance Assessment-License Application Methods and Approach

    SciTech Connect (OSTI)

    J. McNeish

    2002-09-13

    ''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issue (KTI) agreements, the ''Yucca Mountain Review Plan'' (CNWRA 2002 [158449]), and 10 CFR Part 63. This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are utilized in this document.

  20. Portals 4 network API definition and performance measurement

    SciTech Connect (OSTI)

    Brightwell, R. B.

    2012-03-01

    Portals is a low-level network programming interface for distributed memory massively parallel computing systems designed by Sandia, UNM, and Intel. Portals has been designed to provide high message rates and to provide the flexibility to support a variety of higher-level communication paradigms. This project developed and analyzed an implementation of Portals using shared memory in order to measure and understand the impact of using general-purpose compute cores to handle network protocol processing functions. The goal of this study was to evaluate an approach to high-performance networking software design and hardware support that would enable important DOE modeling and simulation applications to perform well and to provide valuable input to Intel so they can make informed decisions about future network software and hardware products that impact DOE applications.