  1. Gas Test Loop Functional and Technical Requirements

    SciTech Connect (OSTI)

    Glen R. Longhurst; Soli T. Khericha; James L. Jones

    2004-09-01

    This document defines the technical and functional requirements for a gas test loop (GTL) to be constructed for the purpose of providing a high intensity fast-flux irradiation environment for developers of advanced concept nuclear reactors. This capability is needed to meet fuels and materials testing requirements of the designers of Generation IV (GEN IV) reactors and other programs within the purview of the Advanced Fuel Cycle Initiative (AFCI). Space nuclear power development programs may also benefit by the services the GTL will offer. The overall GTL technical objective is to provide developers with the means for investigating and qualifying fuels and materials needed for advanced reactor concepts. The testing environment includes a fast-flux neutron spectrum of sufficient intensity to perform accelerated irradiation testing. Appropriate irradiation temperature, gaseous environment, test volume, diagnostics, and access and handling features are also needed. This document serves to identify those requirements as well as generic requirements applicable to any system of this kind.

  2. Deep Borehole Field Test Requirements and Controlled Assumptions.

    SciTech Connect (OSTI)

    Hardin, Ernest

    2015-07-01

    This document presents design requirements and controlled assumptions intended for use in the engineering development and testing of: 1) prototype packages for radioactive waste disposal in deep boreholes; 2) a waste package surface handling system; and 3) a subsurface system for emplacing and retrieving packages in deep boreholes. Engineering development and testing is being performed as part of the Deep Borehole Field Test (DBFT; SNL 2014a). This document presents parallel sets of requirements for a waste disposal system and for the DBFT, showing the close relationship. In addition to design, it will also inform planning for drilling, construction, and scientific characterization activities for the DBFT. The information presented here follows typical preparations for engineering design. It includes functional and operating requirements for handling and emplacement/retrieval equipment, waste package design and emplacement requirements, borehole construction requirements, sealing requirements, and performance criteria. Assumptions are included where they could impact engineering design. Design solutions are avoided in the requirements discussion. Deep Borehole Field Test Requirements and Controlled Assumptions July 21, 2015 iv ACKNOWLEDGEMENTS This set of requirements and assumptions has benefited greatly from reviews by Gordon Appel, Geoff Freeze, Kris Kuhlman, Bob MacKinnon, Steve Pye, David Sassani, Dave Sevougian, and Jiann Su.

  3. Dynamic Object Oriented Requirements System (DOORS) System Test Plan

    SciTech Connect (OSTI)

    JOHNSON, A.L.

    2000-04-01

    The U. S. Department of Energy, Office of River Protection (ORP) will use the Dynamic Object Oriented Requirements System (DOORS) as a tool to assist in identifying, capturing, and maintaining the necessary and sufficient set of requirements for accomplishing the ORP mission. By managing requirements as one integrated set, the ORP will be able to carry out its mission more efficiently and effectively. DOORS is a Commercial-Off-The-Shelf (COTS) requirements management tool. The tool has not been customized for the use of the PIO, at this time.

  4. An Assessment of Fault Current Limiter Testing Requirements ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    As these devices move through the research, development, and demonstration process, there are questions about whether or not the capabilities of commercial T&D equipment testing ...

  5. Seismic requirements for design of nuclear power plants and nuclear test facilities

    SciTech Connect (OSTI)

    Not Available

    1985-02-01

    This standard establishes engineering requirements for the design of nuclear power plants and nuclear test facilities to accommodate vibratory effects of earthquakes.

  6. Deriving In-Use PHEV Fuel Economy Predictions from Standardized Test Cycle Results: Preprint

    SciTech Connect (OSTI)

    Gonder, J.; Brooker, A.; Carlson, R.; Smart, J.

    2009-08-01

    Explores the issue of how to apply an adjustment method to raw plug-in hybrid vehicle dynamometer test results to better estimate PHEVs' in-use fuel and electricity consumption.

  7. Preliminary requirements for a Fluoride Salt-Cooled High-Temperature Test Reactor (FHTR)

    SciTech Connect (OSTI)

    Massie, M.; Forsberg, C.; Forget, B.; Hu, L. W.

    2012-07-01

    A Fluoride Salt-Cooled High-Temperature Test Reactor (FHTR) design is being developed at MIT to provide the first demonstration and test of a salt-cooled reactor using high-temperature fuel. The first step is to define the requirements. The top level requirements are (1) provide the confidence that a larger demonstration reactor is warranted and (2) develop the necessary data for a larger-scale reactor. Because requirements will drive the design of the FHTR, a significant effort is being undertaken to define requirements and understand the tradeoffs that will be required for a practical design. The preliminary requirements include specifications for design parameters and necessary tests of major reactor systems. Testing requirements include demonstration of components, systems, and procedures for refueling, instrumentation, salt temperature control to avoid coolant freezing, salt chemistry and volume control, tritium monitoring and control, and in-service inspection. Safety tests include thermal hydraulics, neutronics - including intrinsic core shutdown mechanisms such as Doppler feedback - and decay heat removal systems. Materials and coolant testing includes fuels (including mechanical wear and fatigue) and system corrosion behavior. Preliminary analysis indicates a thermal power output below 30 MW, an initial core using pebble-bed or prismatic-block fuel, peak outlet temperatures of at least 700 deg. C, and use of FLi{sup 7}Be ({sup 7}LiF-BeF{sub 2}) coolant. The option to change-out the reactor core, fuel type, and major components is being investigated. While the FHTR will be used for materials testing, its primary mission is as a reactor system performance test to enable the design and licensing of a FHR demonstration power reactor. (authors)

  8. An Analysis of Testing Requirements for Fluoride Salt Cooled High Temperature Reactor Components

    SciTech Connect (OSTI)

    Holcomb, David Eugene; Cetiner, Sacit M; Flanagan, George F; Peretz, Fred J; Yoder Jr, Graydon L

    2009-11-01

    This report provides guidance on the component testing necessary during the next phase of fluoride salt-cooled high temperature reactor (FHR) development. In particular, the report identifies and describes the reactor component performance and reliability requirements, provides an overview of what information is necessary to provide assurance that components will adequately achieve the requirements, and then provides guidance on how the required performance information can efficiently be obtained. The report includes a system description of a representative test scale FHR reactor. The reactor parameters presented in this report should only be considered as placeholder values until an FHR test scale reactor design is completed. The report focus is bounded at the interface between and the reactor primary coolant salt and the fuel and the gas supply and return to the Brayton cycle power conversion system. The analysis is limited to component level testing and does not address system level testing issues. Further, the report is oriented as a bottom-up testing requirements analysis as opposed to a having a top-down facility description focus.

  9. Safety requirements, facility user needs, and reactor concepts for a new Broad Application Test Reactor

    SciTech Connect (OSTI)

    Ryskamp, J.M.; Liebenthal, J.L.; Denison, A.B.; Fletcher, C.D.

    1992-07-01

    This report describes the EG&G Laboratory Directed Research and Development Program (LDRD) Broad Application Test Reactor (BATR) Project that was conducted in fiscal year 1991. The scope of this project was divided into three phases: a project process definition phase, a requirements development phase, and a preconceptual reactor design and evaluation phase. Multidisciplinary teams of experts conducted each phase. This report presents the need for a new test reactor, the project process definition, a set of current and projected regulatory compliance and safety requirements, a set of facility user needs for a broad range of projected testing missions, and descriptions of reactor concepts capable of meeting these requirements. This information can be applied to strategic planning to provide the Department of Energy with management options.

  10. Safety requirements, facility user needs, and reactor concepts for a new Broad Application Test Reactor

    SciTech Connect (OSTI)

    Ryskamp, J.M.; Liebenthal, J.L.; Denison, A.B.; Fletcher, C.D.

    1992-07-01

    This report describes the EG G Laboratory Directed Research and Development Program (LDRD) Broad Application Test Reactor (BATR) Project that was conducted in fiscal year 1991. The scope of this project was divided into three phases: a project process definition phase, a requirements development phase, and a preconceptual reactor design and evaluation phase. Multidisciplinary teams of experts conducted each phase. This report presents the need for a new test reactor, the project process definition, a set of current and projected regulatory compliance and safety requirements, a set of facility user needs for a broad range of projected testing missions, and descriptions of reactor concepts capable of meeting these requirements. This information can be applied to strategic planning to provide the Department of Energy with management options.

  11. Characterizing Test Methods and Emissions Reduction Performance of In-Use

    Broader source: Energy.gov (indexed) [DOE]

    Diesel Retrofit Technologies from the National Clean Diesel Campaign | Department of Energy Evaluation of in-use DPFs shows levels of reduction within in-use testing objectives: PM emission reductions >90%, elemental/black carbon reduction of ~99%, and retrofit durability. PDF icon deer12_geller.pdf More Documents & Publications ARB's Study of Emissions from Diesel and CNG Heavy-duty Transit Buses CNG and Diesel Transite Bus Emissions in Review Evaluating Exhaust Emission Performance

  12. Test Requirements and Conceptual Design for a Potassium Test Loop to Support an Advanced Potassium Rankine Cycle Power Conversion Systems

    SciTech Connect (OSTI)

    Yoder, JR.G.L.

    2006-03-08

    Parameters for continuing the design and specification of an experimental potassium test loop are identified in this report. Design and construction of a potassium test loop is part of the Phase II effort of the project ''Technology Development Program for an Advanced Potassium Rankine Power Conversion System''. This program is supported by the National Aeronautics and Space Administration. Design features for the potassium test loop and its instrumentation system, specific test articles, and engineered barriers for ensuring worker safety and protection of the environment are described along with safety and environmental protection requirements to be used during the design process. Information presented in the first portion of this report formed the basis to initiate the design phase of the program; however, the report is a living document that can be changed as necessary during the design process, reflecting modifications as additional design details are developed. Some portions of the report have parameters identified as ''to be determined'' (TBD), reflecting the early stage of the overall process. In cases where specific design values are presently unknown, the report attempts to document the quantities that remain to be defined in order to complete the design of the potassium test loop and supporting equipment.

  13. Deriving In-Use PHEV Fuel Economy Predictions from Standardized Test Cycle Results

    SciTech Connect (OSTI)

    John Smart; Richard "Barney" Carlson; Jeff Gonder; Aaron Brooker

    2009-09-01

    Plug-in hybrid electric vehicles (PHEVs) have potential to reduce or eliminate the U.S. dependence on foreign oil. Quantifying the amount of petroleum each uses, however, is challenging. To estimate in-use fuel economy for conventional vehicles the Environmental Protection Agency (EPA) conducts chassis dynamometer tests on standard historic drive cycles and then adjusts the resulting “raw” fuel economy measurements downward. Various publications, such as the forthcoming update to the SAE J1711 recommended practice for PHEV fuel economy testing, address the challenges of applying standard test procedures to PHEVs. This paper explores the issue of how to apply an adjustment method to such “raw” PHEV dynamometer test results in order to more closely estimate the in-use fuel and electricity consumption characteristics of these vehicles. The paper discusses two possible adjustment methods, and evaluates one method by applying it to dynamometer data and comparing the result to in-use fleet data (on an aftermarket conversion PHEV). The paper will also present the methodologies used to collect the data needed for this comparison.

  14. Status of the direct absorption receiver panel research experiment: Salt flow and solar test requirements and plans

    SciTech Connect (OSTI)

    Tyner, C.E.

    1989-03-01

    The Panel Research Experiment (PRE) is the first large-scale solar test of the molten nitrate salt direct absorption receiver (DAR) concept. The purpose of the PRE is to demonstrate the engineering feasibility and practicality of the DAR. We will conduct the test at the Central Receiver Test Facility in Albuquerque in two phases: salt flow testing and solar testing. This is a working document to define PRE test objectives and requirements, document the test hardware design, and define test plans. 13 refs., 12 figs., 1 tab.

  15. Necessity and Requirements of a Collaborative Effort to Develop a Large Wind Turbine Blade Test Facility in North America

    SciTech Connect (OSTI)

    Cotrell, J.; Musial, W.; Hughes, S.

    2006-05-01

    The wind power industry in North America has an immediate need for larger blade test facilities to ensure the survival of the industry. Blade testing is necessary to meet certification and investor requirements and is critical to achieving the reliability and blade life needed for the wind turbine industry to succeed. The U.S. Department of Energy's (DOE's) Wind Program is exploring options for collaborating with government, private, or academic entities in a partnership to build larger blade test facilities in North America capable of testing blades up to at least 70 m in length. The National Renewable Energy Laboratory (NREL) prepared this report for DOE to describe the immediate need to pursue larger blade test facilities in North America, categorize the numerous prospective partners for a North American collaboration, and document the requirements for a North American test facility.

  16. Correlating Dynamometer Testing to In-Use Fleet Results of Plug-In Hybrid Electric Vehicles

    SciTech Connect (OSTI)

    John G. Smart; Sera White; Michael Duoba

    2009-05-01

    Standard dynamometer test procedures are currently being developed to determine fuel and electrical energy consumption of plug-in hybrid vehicles (PHEV). To define a repeatable test procedure, assumptions were made about how PHEVs will be driven and charged. This study evaluates these assumptions by comparing results of PHEV dynamometer testing following proposed procedures to actual performance of PHEVs operating in the US Department of Energys (DOE) North American PHEV Demonstration fleet. Results show PHEVs in the fleet exhibit a wide range of energy consumption, which is not demonstrated in dynamometer testing. Sources of variation in performance are identified and examined.

  17. Tank Waste Remediation System tank waste pretreatment and vitrification process development testing requirements assessment

    SciTech Connect (OSTI)

    Howden, G.F.

    1994-10-24

    A multi-faceted study was initiated in November 1993 to provide assurance that needed testing capabilities, facilities, and support infrastructure (sampling systems, casks, transportation systems, permits, etc.) would be available when needed for process and equipment development to support pretreatment and vitrification facility design and construction schedules. This first major report provides a snapshot of the known testing needs for pretreatment, low-level waste (LLW) and high-level waste (HLW) vitrification, and documents the results of a series of preliminary studies and workshops to define the issues needing resolution by cold or hot testing. Identified in this report are more than 140 Hanford Site tank waste pretreatment and LLW/HLW vitrification technology issues that can only be resolved by testing. The report also broadly characterizes the level of testing needed to resolve each issue. A second report will provide a strategy(ies) for ensuring timely test capability. Later reports will assess the capabilities of existing facilities to support needed testing and will recommend siting of the tests together with needed facility and infrastructure upgrades or additions.

  18. DOE Testing Reveals Samsung Refrigerator Does Not Meet Energy Star Requirements

    Broader source: Energy.gov [DOE]

    DOE-initiated testing has revealed that a Samsung refrigerator (model RF26VAB), which the company had claimed was Energy Star compliant, consumed more energy than permitted by the Energy Star...

  19. Functional and operational requirements document : building 1012, Battery and Energy Storage Device Test Facility, Sandia National Laboratories, New Mexico.

    SciTech Connect (OSTI)

    Johns, William H.

    2013-11-01

    This report provides an overview of information, prior studies, and analyses relevant to the development of functional and operational requirements for electrochemical testing of batteries and energy storage devices carried out by Sandia Organization 2546, Advanced Power Sources R&D. Electrochemical operations for this group are scheduled to transition from Sandia Building 894 to a new Building located in Sandia TA-II referred to as Building 1012. This report also provides background on select design considerations and identifies the Safety Goals, Stakeholder Objectives, and Design Objectives required by the Sandia Design Team to develop the Performance Criteria necessary to the design of Building 1012. This document recognizes the Architecture-Engineering (A-E) Team as the primary design entity. Where safety considerations are identified, suggestions are provided to provide context for the corresponding operational requirement(s).

  20. Steam Reforming, 6-in. Bench-Scale Design and Testing Project -- Technical and Functional Requirements Description

    SciTech Connect (OSTI)

    Losinski, Sylvester John; Marshall, Douglas William

    2002-08-01

    Feasibility studies and technology development work are currently being performed on several processes to treat radioactive liquids and solids currently stored at the Idaho Nuclear Technology and Engineering Center (INTEC), located within the Idaho National Engineering and Environmental Laboratory (INEEL). These studies and development work will be used to select a treatment process for treatment of the radioactive liquids and solids to meet treatment milestones of the Settlement Agreement between the Department of Energy and the State of Idaho. One process under consideration for treating the radioactive liquids and solids, specifically Sodium-Bearing Waste (SBW) and tank heel solids, is fluid bed steam reforming (FBSR). To support both feasibility and development studies a bench-scale FBSR is being designed and constructed. This report presents the technical and functional requirements, experimental objectives, process flow sheets, and equipment specifications for the bench-scale FBSR.

  1. Testing, licensing, and code requirements for seismic isolation systems (for nuclear power plants)

    SciTech Connect (OSTI)

    Seidensticker, R.W.

    1987-01-01

    The use of seismic isolation as an earthquake hazard mitigation strategy for nuclear reactor power plants is rapidly receiving interest throughout the world. Seismic isolation has already been used on at least two French PWR plants, was to have been used for plants to be built in Iran, and is under serious consideration for advanced LMR plants (in the US, UK, France, and Japan). In addition, there is a growing use of seismic isolation throughout the world for other critical facilities such as hospitals, emergency facilities, buildings with very high-cost equipment (e.g., computers) and as a strategy to reduce loss of life and expensive equipment in earthquakes. Such a design approach is in complete contrast to the conventional seismic design strategy in which the structure and components are provided with sufficient strength and ductility to resist the earthquake forces and to prevent structural collapses or failure. The use of seismic isolation for nuclear plants can, therefore, be expected to be a significant licensing issue. For isolation, the licensing process must shift away in large measure from the superstructure and concentrate on the behavior of the seismic isolation system. This paper is not intended to promote the advantages of seismic isolation system, but to explore in some detail those technical issues which must be satisfactorily addressed to achieve full licensability of the use of seismic isolation as a viable, attractive and economical alternative to current traditional design approaches. Special problems and topics associated with testing and codes and standards development are addressed. A positive program for approach or strategy to secure licensing is presented.

  2. Requirements for Defining Utility Drive Cycles: An Exploratory Analysis of Grid Frequency Regulation Data for Establishing Battery Performance Testing Standards

    SciTech Connect (OSTI)

    Hafen, Ryan P.; Vishwanathan, Vilanyur V.; Subbarao, Krishnappa; Kintner-Meyer, Michael CW

    2011-10-19

    Battery testing procedures are important for understanding battery performance, including degradation over the life of the battery. Standards are important to provide clear rules and uniformity to an industry. The work described in this report addresses the need for standard battery testing procedures that reflect real-world applications of energy storage systems to provide regulation services to grid operators. This work was motivated by the need to develop Vehicle-to-Grid (V2G) testing procedures, or V2G drive cycles. Likewise, the stationary energy storage community is equally interested in standardized testing protocols that reflect real-world grid applications for providing regulation services. As the first of several steps toward standardizing battery testing cycles, this work focused on a statistical analysis of frequency regulation signals from the Pennsylvania-New Jersey-Maryland Interconnect with the goal to identify patterns in the regulation signal that would be representative of the entire signal as a typical regulation data set. Results from an extensive time-series analysis are discussed, and the results are explained from both the statistical and the battery-testing perspectives. The results then are interpreted in the context of defining a small set of V2G drive cycles for standardization, offering some recommendations for the next steps toward standardizing testing protocols.

  3. Quantifying and Addressing the DOE Material Reactivity Requirements with Analysis and Testing of Hydrogen Storage Materials & Systems

    SciTech Connect (OSTI)

    Khalil, Y. F

    2015-01-05

    The objective of this project is to examine safety aspects of candidate hydrogen storage materials and systems being developed in the DOE Hydrogen Program. As a result of this effort, the general DOE safety target will be given useful meaning by establishing a link between the characteristics of new storage materials and the satisfaction of safety criteria. This will be accomplished through the development and application of formal risk analysis methods, standardized materials testing, chemical reactivity characterization, novel risk mitigation approaches and subscale system demonstration. The project also will collaborate with other DOE and international activities in materials based hydrogen storage safety to provide a larger, highly coordinated effort.

  4. Regulatory fire test requirements for plutonium air transport packages : JP-4 or JP-5 vs. JP-8 aviation fuel.

    SciTech Connect (OSTI)

    Figueroa, Victor G.; Lopez, Carlos; Nicolette, Vernon F.

    2010-10-01

    For certification, packages used for the transportation of plutonium by air must survive the hypothetical thermal environment specified in 10CFR71.74(a)(5). This regulation specifies that 'the package must be exposed to luminous flames from a pool fire of JP-4 or JP-5 aviation fuel for a period of at least 60 minutes.' This regulation was developed when jet propellant (JP) 4 and 5 were the standard jet fuels. However, JP-4 and JP-5 currently are of limited availability in the United States of America. JP-4 is very hard to obtain as it is not used much anymore. JP-5 may be easier to get than JP-4, but only through a military supplier. The purpose of this paper is to illustrate that readily-available JP-8 fuel is a possible substitute for the aforementioned certification test. Comparisons between the properties of the three fuels are given. Results from computer simulations that compared large JP-4 to JP-8 pool fires using Sandia's VULCAN fire model are shown and discussed. Additionally, the Container Analysis Fire (CAFE) code was used to compare the thermal response of a large calorimeter exposed to engulfing fires fueled by these three jet propellants. The paper then recommends JP-8 as an alternate fuel that complies with the thermal environment implied in 10CFR71.74.

  5. Coupled optical/thermal/fluid analysis and design requirements for operation and testing of a supercritical CO2 solar receiver.

    SciTech Connect (OSTI)

    Khivsara, Sagar

    2015-01-01

    Recent studies have evaluated closed-loop supercritical carbon dioxide (s-CO2) Brayton cycles to be a higher energy-density system in comparison to conventional superheated steam Rankine systems. At turbine inlet conditions of 923K and 25 MPa, high thermal efficiency (~50%) can be achieved. Achieving these high efficiencies will make concentrating solar power (CSP) technologies a competitive alternative to current power generation methods. To incorporate a s-CO2 Brayton power cycle in a solar power tower system, the development of a solar receiver capable of providing an outlet temperature of 923 K (at 25 MPa) is necessary. To satisfy the temperature requirements of a s-CO2 Brayton cycle with recuperation and recompression, it is required to heat s-CO2 by a temperature of ~200 K as it passes through the solar receiver. Our objective was to develop an optical-thermal-fluid model to design and evaluate a tubular receiver that will receive a heat input ~1 MWth from a heliostat field. We also undertook the documentation of design requirements for the development, testing and safe operation of a direct s-CO2 solar receiver. The main purpose of this document is to serve as a reference and guideline for design and testing requirements, as well as to address the technical challenges and provide initial parameters for the computational models that will be employed for the development of s-CO2 receivers.

  6. Idaho National Laboratory Lead or Lead-Bismuth Eutectic (LBE) Test Facility - R&D Requirements, Design Criteria, Design Concept, and Concept Guidance

    SciTech Connect (OSTI)

    Eric P. Loewen; Paul Demkowicz

    2005-05-01

    The Idaho National Laboratory Lead-Bismuth Eutectic Test Facility will advance the state of nuclear technology relative to heavy-metal coolants (primarily Pb and Pb-Bi), thereby allowing the U.S. to maintain the pre-eminent position in overseas markets and a future domestic market. The end results will be a better qualitative understanding and quantitative measure of the thermal physics and chemistry conditions in the molten metal systems for varied flow conditions (single and multiphase), flow regime transitions, heat input methods, pumping requirements for varied conditions and geometries, and corrosion performance. Furthering INL knowledge in these areas is crucial to sustaining a competitive global position. This fundamental heavy-metal research supports the National Energy Policy Development Groups stated need for energy systems to support electrical generation.1 The project will also assist the Department of Energy in achieving goals outlined in the Nuclear Energy Research Advisory Committee Long Term Nuclear Technology Research and Development Plan,2 the Generation IV Roadmap for Lead Fast Reactor development, and Advanced Fuel Cycle Initiative research and development. This multi-unit Lead-Bismuth Eutectic Test Facility with its flexible and reconfigurable apparatus will maintain and extend the U.S. nuclear knowledge base, while educating young scientists and engineers. The uniqueness of the Lead-Bismuth Eutectic Test Facility is its integrated Pool Unit and Storage Unit. This combination will support large-scale investigation of structural and fuel cladding material compatibility issues with heavy-metal coolants, oxygen chemistry control, and thermal hydraulic physics properties. Its ability to reconfigure flow conditions and piping configurations to more accurately approximate prototypical reactor designs will provide a key resource for Lead Fast Reactor research and development. The other principal elements of the Lead-Bismuth Eutectic Test Facility (in addition to the Pool Unit and Storage Unit) are the Bench Scale Unit and Supporting Systems, principal of which are the O2 Sensor/Calibration System, Feed System, Transfer System, Off- Gas System, Purge and Evacuation System, Oxygen Sensor and Control System, Data Acquisition and Control System, and the Safety Systems. Parallel and/or independent corrosion studies and convective heat transfer experiments for cylindrical and annular geometries will support investigation of heat transfer phenomena into the secondary side. In addition, molten metal pumping concepts and power requirements will be measured for future design use.

  7. Reporting Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reporting Requirements Reporting Requirements Contacts Director Albert Migliori Deputy Franz Freibert 505 667-6879 Email Professional Staff Assistant Susan Ramsay 505 665 0858...

  8. Animation Requirements

    Broader source: Energy.gov [DOE]

    Animations include dynamic elements such as interactive images and games. For developing animations, follow these design and coding requirements.

  9. Competition Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ---------------------------------------- Chapter 6.1 (July 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal

  10. Eligibility Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Eligibility Requirements Eligibility Requirements A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Eligibility and required supporting documentation The Laboratory offers an extensive benefits package to full and part time employees. Casual employees (excluding High School Coop, Lab Associates and Craft Employees) are eligible to enroll in the HDHP medical plan. NOTE:

  11. Reporting Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reporting Requirements Reporting Requirements Contacts Director Albert Migliori Deputy Franz Freibert 505 667-6879 Email Professional Staff Assistant Susan Ramsay 505 665 0858 Email The Fellow will be required to participate in the Actinide Science lecture series by both attending lectures and presenting a scientific lecture on actinide science in this series. Submission of a viewgraph and brief write-up of the project. Provide metrics information as requested. Submission of an overview article

  12. Video Requirements

    Broader source: Energy.gov [DOE]

    All EERE videos, including webinar recordings, must meet Section 508's requirements for accessibility. All videos should be hosted on the DOE YouTube channel.

  13. Deployment Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Placement, Physical Size, Control Circuitry, Power Requirement, Electronic Interface, Pneumatic Design, Shelf Life, MaturityAvailability, Regulations (Codes), Alarm Set Points * ...

  14. Competition Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    --------------------------- Chapter 6.5 (January 2011) 1 Competition Advocate Responsibilities [Reference: FAR 6.5, FAR 7 and DEAR 906.501] Overview This section discusses the competition advocate requirements and provides a Federal Procurement Data System-New Generation (FPDS-NG) coding assistance sheet and screen shots for the FPDS-NG Competition Report. Background FAR Part 6.5, -Competition Advocates,‖ implements section 20 of the Office of Federal Procurement Policy Act, which requires

  15. Competition Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ---- ----------------------------------------------- Chapter 5.2 (April 2008) Synopsizing Proposed Non-Competitive Contract Actions Citing the Authority of FAR 6.302-1 [Reference: FAR 5 and DEAR 905] Overview This section discusses publicizing sole source actions as part of the approval of a Justification for Other than Full and Open Competition (JOFOC) using the authority of FAR 6.302-1. Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using

  16. Requirements Definition Stage

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-05-21

    This chapter addresses development of a Software Configuration Management Plan to track and control work products, analysis of the system owner/users' business processes and needs, translation of those processes and needs into formal requirements, and planning the testing activities to validate the performance of the software product.

  17. ASCR Science Network Requirements

    SciTech Connect (OSTI)

    Dart, Eli; Tierney, Brian

    2009-08-24

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In April 2009 ESnet and the Office of Advanced Scientific Computing Research (ASCR), of the DOE Office of Science, organized a workshop to characterize the networking requirements of the programs funded by ASCR. The ASCR facilities anticipate significant increases in wide area bandwidth utilization, driven largely by the increased capabilities of computational resources and the wide scope of collaboration that is a hallmark of modern science. Many scientists move data sets between facilities for analysis, and in some cases (for example the Earth System Grid and the Open Science Grid), data distribution is an essential component of the use of ASCR facilities by scientists. Due to the projected growth in wide area data transfer needs, the ASCR supercomputer centers all expect to deploy and use 100 Gigabit per second networking technology for wide area connectivity as soon as that deployment is financially feasible. In addition to the network connectivity that ESnet provides, the ESnet Collaboration Services (ECS) are critical to several science communities. ESnet identity and trust services, such as the DOEGrids certificate authority, are widely used both by the supercomputer centers and by collaborations such as Open Science Grid (OSG) and the Earth System Grid (ESG). Ease of use is a key determinant of the scientific utility of network-based services. Therefore, a key enabling aspect for scientists beneficial use of high performance networks is a consistent, widely deployed, well-maintained toolset that is optimized for wide area, high-speed data transfer (e.g. GridFTP) that allows scientists to easily utilize the services and capabilities that the network provides. Network test and measurement is an important part of ensuring that these tools and network services are functioning correctly. One example of a tool in this area is the recently developed perfSONAR, which has already shown its usefulness in fault diagnosis during the recent deployment of high-performance data movers at NERSC and ORNL. On the other hand, it is clear that there is significant work to be done in the area of authentication and access control - there are currently compatibility problems and differing requirements between the authentication systems in use at different facilities, and the policies and mechanisms in use at different facilities are sometimes in conflict. Finally, long-term software maintenance was of concern for many attendees. Scientists rely heavily on a large deployed base of software that does not have secure programmatic funding. Software packages for which this is true include data transfer tools such as GridFTP as well as identity management and other software infrastructure that forms a critical part of the Open Science Grid and the Earth System Grid.

  18. In-service Inspection Ultrasonic Testing of Reactor Pressure Vessel Welds for Assessing Flaw Density and Size Distribution per 10 CFR 50.61a, Alternate Fracture Toughness Requirements

    SciTech Connect (OSTI)

    Sullivan, Edmund J.; Anderson, Michael T.; Norris, Wallace

    2012-09-17

    Pressurized thermal shock (PTS) events are system transients in a pressurized water reactor (PWR) in which there is a rapid operating temperature cool-down that results in cold vessel temperatures with or without repressurization of the vessel. The rapid cooling of the inside surface of the reactor pressure vessel (RPV) causes thermal stresses that can combine with stresses caused by high pressure. The aggregate effect of these stresses is an increase in the potential for fracture if a pre-existing flaw is present in a material susceptible to brittle failure. The ferritic, low alloy steel of the reactor vessel beltline adjacent to the core, where neutron radiation gradually embrittles the material over the lifetime of the plant, can be susceptible to brittle fracture. The PTS rule, described in the Code of Federal Regulations, Title 10, Section 50.61 (§50.61), “Fracture Toughness Requirements for Protection against Pressurized Thermal Shock Events,” adopted on July 23, 1985, establishes screening criteria to ensure that the potential for a reactor vessel to fail due to a PTS event is deemed to be acceptably low. The U.S. Nuclear Regulatory Commission (NRC) completed a research program that concluded that the risk of through-wall cracking due to a PTS event is much lower than previously estimated. The NRC subsequently developed a rule, §50.61a, published on January 4, 2010, entitled “Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events” (75 FR 13). Use of the new rule by licensees is optional. The §50.61a rule differs from §50.61 in that it requires licensees who choose to follow this alternate method to analyze the results from periodic volumetric examinations required by the ASME Code, Section XI, Rules for Inservice Inspection (ISI) of Nuclear Power Plants. These analyses are intended to determine if the actual flaw density and size distribution in the licensee’s reactor vessel beltline welds are bounded by the flaw density and size distribution values used in the PTS technical basis. Under a contract with the NRC, Pacific Northwest National Laboratory (PNNL) has been working on a program to assess the ability of current inservice inspection (ISI)-ultrasonic testing (UT) techniques, as qualified through ASME Code, Appendix VIII, Supplements 4 and 6, to detect small fabrication or inservice-induced flaws located in RPV welds and adjacent base materials. As part of this effort, the investigators have pursued an evaluation, based on the available information, of the capability of UT to provide flaw density/distribution inputs for making RPV weld assessments in accordance with §50.61a. This paper presents the results of an evaluation of data from the 1993 Browns Ferry Nuclear Plant, Unit 3, Spirit of Appendix VIII reactor vessel examination, a comparison of the flaw density/distribution from this data with the distribution in §50.61a, possible reasons for differences, and plans and recommendations for further work in this area.

  19. Requirements for GNEP Transmutation Fuels

    SciTech Connect (OSTI)

    D. C. Crawford; M. K. Meyer; S. L. Hayes

    2007-03-01

    The purpose of this document is to provide a baseline set of requirements to guide fuel fabrication development and irradiation testing performed as part of the AFCRD Transmutation Fuel Development Program. This document can be considered a supplement to the GNEP TRU Fuel Development and Qualification Plan, and will be revised as necessary to maintain a documented set of fuel testing objectives and requirements consistent with programmatic decisions and advances in technical knowledge.

  20. LEGACY MANAGEMENT REQUIRES INFORMATION

    SciTech Connect (OSTI)

    CONNELL, C.W.; HILDEBRAND, R.D.

    2006-12-14

    ''Legacy Management Requires Information'' describes the goal(s) of the US Department of Energy's Office of Legacy Management (LM) relative to maintaining critical records and the way those goals are being addressed at Hanford. The paper discusses the current practices for document control, as well as the use of modern databases for both storing and accessing the data to support cleanup decisions. In addition to the information goals of LM, the Hanford Federal Facility Agreement and Consent Order, known as the ''Tri-Party Agreement'' (TPA) is one of the main drivers in documentation and data management. The TPA, which specifies discrete milestones for cleaning up the Hanford Site, is a legally binding agreement among the US Department of Energy (DOE), the Washington State Department of Ecology (Ecology), and the US Environmental Protection Agency (EPA). The TPA requires that DOE provide the lead regulatory agency with the results of analytical laboratory and non-laboratory tests/readings to help guide them in making decisions. The Agreement also calls for each signatory to preserve--for at least ten years after the Agreement has ended--all of the records in its or its contractors, possession related to sampling, analysis, investigations, and monitoring conducted. The tools used at Hanford to meet TPA requirements are also the tools that can satisfy the needs of LM.

  1. FES Requirements Review 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FES Requirements Review 2014 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR Requirements Review 2015 Previous Reviews HEP/NP Requirements Review 2013 FES Requirements Review 2014 FES Attendees 2014 BES Requirements Review 2014 Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1

  2. BES Requirements Review 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BES Requirements Review 2014 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR Requirements Review 2015 Previous Reviews HEP/NP Requirements Review 2013 FES Requirements Review 2014 BES Requirements Review 2014 BES Attendees 2014 Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1

  3. BER Requirements Review 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 BER Attendees 2015 ASCR Requirements...

  4. Requirements for Wind Development

    Broader source: Energy.gov [DOE]

    In 2015 Oklahoma amended the Oklahoma Wind Energy Development Act. The amendments added new financial security requirements, setback requirements, and notification requirements for wind energy...

  5. Feed tank transfer requirements

    SciTech Connect (OSTI)

    Freeman-Pollard, J.R.

    1998-09-16

    This document presents a definition of tank turnover; DOE responsibilities; TWRS DST permitting requirements; TWRS Authorization Basis (AB) requirements; TWRS AP Tank Farm operational requirements; unreviewed safety question (USQ) requirements; records and reporting requirements, and documentation which will require revision in support of transferring a DST in AP Tank Farm to a privatization contractor for use during Phase 1B.

  6. Evaluation on the Feasibility of Using Ultrasonic Testing of Reactor Pressure Vessel Welds for Assessing Flaw Density/Distribution per 10 CFR 50.61a, Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock

    SciTech Connect (OSTI)

    Sullivan, Edmund J.; Anderson, Michael T.

    2014-06-10

    This technical letter report provides the status of an assessment undertaken by PNNL at the request of the NRC to verify the capability of periodic ASME-required volumetric examinations of reactor vessels to characterize the density and distribution of flaws of interest for applying §50.61a on a plant-by-plant basis. The PTS rule, described in the Code of Federal Regulations, Title 10, Section 50.61 (§50.61), "Fracture Toughness Requirements for Protection against Pressurized Thermal Shock Events," establishes screening criteria to ensure that the potential for a reactor vessel to fail due to a PTS event is deemed to be acceptably low. Recently, the NRC completed a research program that concluded that the risk of through-wall cracking due to a PTS event is much lower than previously estimated. The NRC subsequently developed and promulgated an alternate PTS rule, §50.61a, that can be implemented by PWR licensees. The §50.61a rule differs from §50.61 in that it requires licensees who choose to follow this alternate method to analyze the results from periodic volumetric examinations required by the ASME Code, Section XI, Rules for Inservice Inspection (ISI) of Nuclear Power Plants.

  7. Coaxial test fixture

    DOE Patents [OSTI]

    Praeg, W.F.

    1984-03-30

    This invention pertains to arrangements for performing electrical tests on contact material samples, and in particular for testing contact material test samples in an evacuated environment under high current loads. Frequently, it is desirable in developing high-current separable contact material, to have at least a preliminary analysis of selected candidate conductor materials. Testing of material samples will hopefully identify materials unsuitable for high current electrical contact without requiring incorporation of the materials into a completed and oftentimes complex structure.

  8. Science Requirements Process

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Science Requirements Reviews Network Requirements Reviews Requirements Review Reports Case Studies News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet Live Home » Science Engagement » Science Requirements Reviews Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1

  9. ASCR Requirements Review 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ASCR Requirements Review 2015 ASCR Attendees 2015 Previous Reviews Requirements Review Reports Case Studies News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet Live Home » Science Engagement » Science Requirements Reviews » Network Requirements Reviews » ASCR Requirements Review 2015 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials

  10. BER Requirements Review 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BER Attendees 2015 ASCR Requirements Review 2015 Previous Reviews Requirements Review Reports Case Studies News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet Live Home » Science Engagement » Science Requirements Reviews » Network Requirements Reviews » BER Requirements Review 2015 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials

  11. SPECTR System Operational Test Report

    SciTech Connect (OSTI)

    W.H. Landman Jr.

    2011-08-01

    This report overviews installation of the Small Pressure Cycling Test Rig (SPECTR) and documents the system operational testing performed to demonstrate that it meets the requirements for operations. The system operational testing involved operation of the furnace system to the design conditions and demonstration of the test article gas supply system using a simulated test article. The furnace and test article systems were demonstrated to meet the design requirements for the Next Generation Nuclear Plant. Therefore, the system is deemed acceptable and is ready for actual test article testing.

  12. Feed tank transfer requirements

    SciTech Connect (OSTI)

    Freeman-Pollard, J.R.

    1998-09-16

    This document presents a definition of tank turnover. Also, DOE and PC responsibilities; TWRS DST permitting requirements; TWRS Authorization Basis (AB) requirements; TWRS AP Tank Farm operational requirements; unreviewed safety question (USQ) requirements are presented for two cases (i.e., tank modifications occurring before tank turnover and tank modification occurring after tank turnover). Finally, records and reporting requirements, and documentation which will require revision in support of transferring a DST in AP Tank Farm to a privatization contractor are presented.

  13. Requirements Review Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Review Reports Case Studies News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet Live Home » Science Engagement » Science Requirements Reviews » Requirements Review Reports Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1

  14. Regulators, Requirements, Statutes

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Air Act (CAA) Requirements for air quality and air emissions from facility operations Clean Water Act (CWA) Requirements for water quality and water discharges from facility...

  15. ZEST flight test experiments, Kauai Test Facility, Hawaii. Test report

    SciTech Connect (OSTI)

    Cenkci, M.J.

    1991-07-01

    The Strategic Defense Initiative Organization (SDIO) is proposing to execute two ZEST flight experiments to obtain information related to the following objectives: validation of payload modeling; characterization of a high energy release cloud; and documentation of scientific phenomena that may occur as a result of releasing a high energy cloud. The proposed action is to design, develop, launch, and detonate two payloads carrying high energy explosives. Activities required to support this proposal include: (1) execution of component assembly tests at Space Data Division (SDD) in Chandler, Arizona and Los Alamos National Laboratory (LANL) in Los Alamos, New Mexico, and (2) execution of pre-flight flight test activities at Kauai Test Facility.

  16. Network Requirements Reviews

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reviews Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR Requirements Review 2015 Previous Reviews Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site

  17. ZiaTest

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ZiaTest ZiaTest Description This test executes a new proposed standard benchmark method for MPI startup that is intended to provide a realistic assessment of both launch and wireup requirements. Accordingly, it exercises both the launch system of the environment and the interconnect subsystem in a specified pattern. Specifically, the test consists of the following steps: Record a time stamp for when the test started - this is passed to rank=0 upon launch. Launch a 100MB executable on a specified

  18. Federal Substance Abuse Testing Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-01-30

    The Order establishes the requirements and responsibilities for the DOE Federal Substance Abuse Testing Program which covers drug and alcohol testing. Supersedes DOE O 3792.3 Chg 1.

  19. Electrostatic discharge testing of electroexplosive devices

    SciTech Connect (OSTI)

    Hingorani, S.L.

    1990-01-01

    Electrostatic discharge (ESD) testing of electroexplosive devices has previously been regarded as single pulse, go/no-go testing, the emphasis being on the safety of the devices when exposed to human handling. For some components it has been found to be a destructive test; for others the test is performed 100% in production product-acceptance testing and is considered a nondestructive and nondegrading test if the component does not fire. Recent studies performed by R. J. Fisher at Sandia have resulted in a new model of the worst case human body electrostatic discharge that is more accurate than the model that is currently in use for testing electroexplosive components. In addition, recent requirements for no degradation or loss of reliability after multiple exposures (up to 100) have changed the go/no-go nature of the test. Several components have been tested to the new ESD model; results regarding both safety and reliability will be presented and discussed. 9 refs., 7 figs., 2 tabs.

  20. TESTING LED COLOR-TUNABLE PRODUCTS

    Broader source: Energy.gov [DOE]

    New product capabilities and performance variables require new test methods to be developed, which is important for industry because accurate, repeatable, standardized test methods enable accurate...

  1. Specifications and Test Procedures | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Specifications and Test Procedures Grid interoperability requires a complex set of interactions defined by specifications and proven through standardized test procedures. Grid...

  2. Requirements Management Database

    Energy Science and Technology Software Center (OSTI)

    2009-08-13

    This application is a simplified and customized version of the RBA and CTS databases to capture federal, site, and facility requirements, link to actions that must be performed to maintain compliance with their contractual and other requirements.

  3. Crane Test

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Crane Safety Test Instructions: All Training and Testing Material is for LSU CAMD Users ... A minimum passing score is 80% (8 out of 10) This test can only be taken once in a thirty ...

  4. Lustre Tests

    Energy Science and Technology Software Center (OSTI)

    2007-08-31

    Lustre-tests is a package of regression tests for the Lustre file system containing I/O workloads representative of problems discovered on production systems.

  5. RMACS software requirements specification

    SciTech Connect (OSTI)

    Gneiting, B.C.

    1996-10-01

    This document defines the essential user (or functional) requirements of the Requirements Management and Assured Compliance System (RMACS), which is used by the Tank Waste Remediation System program (TWRS). RMACS provides a computer-based environment that TWRS management and systems engineers can use to identify, define, and document requirements. The intent of the system is to manage information supporting definition of the TWRS technical baseline using a structured systems engineering process. RMACS has the capability to effectively manage a complete set of complex requirements and relationships in a manner that satisfactorily assures compliance to the program requirements over the TWRS life-cycle.

  6. Requirement-Reviews.pptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1, 2 013 Requirements Reviews * 1½-day reviews with each Program Office * Computing and storage requirements for next 5 years * Participants - DOE ADs & Program Managers - Leading scientists using NERSC & key potential users - NERSC staff 2 High Energy Physics Fusion R esearch Reports From 6 Requirements Reviews Have Been Published 3 h%p://www.nersc.gov/science/requirements---reviews/ final---reports/ * Compu<ng a nd s torage requirements f or 2013/2014 * Execu<ve S ummary o f

  7. Pendulum detector testing device

    DOE Patents [OSTI]

    Gonsalves, John M.

    1997-01-01

    A detector testing device which provides consistent, cost-effective, repeatable results. The testing device is primarily constructed of PVC plastic and other non-metallic materials. Sensitivity of a walk-through detector system can be checked by: 1) providing a standard test object simulating the mass, size and material content of a weapon or other contraband, 2) suspending the test object in successive positions, such as head, waist and ankle levels, simulating where the contraband might be concealed on a person walking through the detector system; and 3) swinging the suspended object through each of the positions, while operating the detector system and observing its response. The test object is retained in a holder in which the orientation of the test device or target can be readily changed, to properly complete the testing requirements.

  8. Pendulum detector testing device

    DOE Patents [OSTI]

    Gonsalves, J.M.

    1997-09-30

    A detector testing device is described which provides consistent, cost-effective, repeatable results. The testing device is primarily constructed of PVC plastic and other non-metallic materials. Sensitivity of a walk-through detector system can be checked by: (1) providing a standard test object simulating the mass, size and material content of a weapon or other contraband, (2) suspending the test object in successive positions, such as head, waist and ankle levels, simulating where the contraband might be concealed on a person walking through the detector system; and (3) swinging the suspended object through each of the positions, while operating the detector system and observing its response. The test object is retained in a holder in which the orientation of the test device or target can be readily changed, to properly complete the testing requirements. 5 figs.

  9. Other Requirements - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Other Requirements by Website Administrator More filters Less filters Other Policy Type Secretarial Memo Program Office Memo Invoked Technical Standards 100 Office of Primary Interest (OPI) Office of Primary Interest (OPI) All AD - Office of Administrative Services AU - Office of Environment, Health, Safety and Security CF - Office of the Chief Financial Officer CI - Office of Congressional and Intergovernmental Affairs CN - Office of Counterintelligence CP - Office of the Press Secretary CR -

  10. Reusable fuel test assembly for the FFTF

    SciTech Connect (OSTI)

    Pitner, A.L.; Dittmer, J.O.

    1992-03-01

    A fuel test assembly for use in the Fast Flux Test Facility (FFTF) has been developed that provides re-irradiation capability after interim discharge and reconstitution of the test pin bundle. This test vehicle permits irradiation test data to be obtained at multiple exposures on a few select test pins without the substantial expense of fabricating individual test assemblies as would otherwise be required. A variety of different test pin types can be loaded in the reusable test assembly.

  11. ESnet Requirements Workshops

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Workshops Summary for Sites Eli Dart, Network Engineer ESnet Network Engineering Group ESnet Site Coordinating Committee Meeting Clemson, SC February 2, 2011 Lawrence Berkeley National Laboratory U.S. Department of Energy | Office of Science Overview ESnet requirements workshops - what are they? Common themes Discussion of subset of requirements learned * Examples of trends * Success stories * Upcoming needs that are currently unmet Thoughts for discussion 2/1/11 2 Lawrence Berkeley

  12. BER Science Network Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BER Science Network Requirements Report of the Biological and Environmental Research Network Requirements Workshop Conducted July 26 and 27, 2007 BER Science Network Requirements Workshop Biological and Environmental Research Program Office, DOE Office of Science Energy Sciences Network Bethesda, MD - July 26 and 27, 2007 ESnet is funded by the US Dept. of Energy, Office of Science, Advanced Scientific Computing Research (ASCR) program. Dan Hitchcock is the ESnet Program Manager. ESnet is

  13. BES Science Network Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Network Requirements Report of the Basic Energy Sciences Network Requirements Workshop Conducted June 4-5, 2007 BES Science Network Requirements Workshop Basic Energy Sciences Program Office, DOE Office of Science Energy Sciences Network Washington, DC - June 4 and 5, 2007 ESnet is funded by the US Dept. of Energy, Office of Science, Advanced Scientific Computing Research (ASCR) program. Dan Hitchcock is the ESnet Program Manager. ESnet is operated by Lawrence Berkeley National Laboratory, which

  14. User Requirements Gathered for

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Gathered for the NERSC 7 Procurement Richard Gerber NERSC User Services NUG 2012 February 3, 2012 NERSC Oakland Scientific Facility User Requirements for NERSC 7 Largely based on a series of NERSC workshops. * Goal: Ensure that NERSC continues to provide the world-class facilities and services needed to support DOE Office of Science Research" * Method: Workshops to derive and document each DOE SC Office's HPC requirements for NERSC in 2013-14" * Deliverables: Reports that

  15. ASCR Requirements Review 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ASCR Program Office. These requirements will serve as input to the ESnet architecture and planning processes, and will help ensure that ESnet continues to provide world-class...

  16. BES Requirements Review 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BES Program Office. These requirements will serve as input to the ESnet architecture and planning processes, and will help ensure that ESnet continues to provide world-class...

  17. Transuranic Waste Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-07-09

    The guide provides criteria for determining if a waste is to be managed in accordance with DOE M 435.1-1, Chapter III, Transuranic Waste Requirements.

  18. HPC Requirements Reviews

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reviews: Target 2017 Requirements Reviews: Target 2014 Overview Published Reports Case Study FAQs NERSC HPC Achievement Awards Accelerator Science Astrophysics & Cosmology...

  19. Environmental Requirements Management

    SciTech Connect (OSTI)

    Cusack, Laura J.; Bramson, Jeffrey E.; Archuleta, Jose A.; Frey, Jeffrey A.

    2015-01-08

    CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organization’s ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: • Communicating requirements • Planning work • Maintaining work controls • Maintaining compliance

  20. Residential Solar Permit Requirements

    Office of Energy Efficiency and Renewable Energy (EERE)

    Washington's State Building Code sets requirements for the installation, inspection, maintenance and repair of solar photovoltaic (PV) energy systems. Local jurisdictions have the authority to...

  1. Required Annual Notices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Required Annual Notices The Women's Health and Cancer Rights Act of 1998 (WHCRA) The medical programs sponsored by LANS will not restrict benefits if you or your dependent...

  2. Improvements to Technical Specifications surveillance requirements

    SciTech Connect (OSTI)

    Lobel, R.; Tjader, T.R.

    1992-12-01

    In August 1983 an NRC task group was formed to investigate problems with surveillance testing required by Technical Specifications, and to recommend approaches to effect improvements. NUREG-1024 ( Technical Specifications-Enhancing Safety Impact'') resulted, and it contained recommendations to review the basis for test frequencies; to ensure that the tests promote safety and do not degrade equipment; and to review surveillance tests so that they do not unnecessarily burden personnel. The Technical Specifications Improvement Program (TSIP) was established in December 1984 to provide the framework for rewriting and improving the Technical Specifications. As an element of the TSIP, all Technical Specifications surveillance requirements were comprehensively examined as recommended in NUREG-1024. The results of that effort are presented in this report. The study found that while some testing at power is essential to verify equipment and system operability, safety can be improved, equipment degradation decreased, and unnecessary personnel burden relaxed by reducing the amount of testing at power.

  3. Secretary Bodman's Memorandum Regarding Drug Testing at DOE

    Broader source: Energy.gov [DOE]

    Decisions regarding drug testing for Department of Energy positions that require access authorizations (Security Clearances)

  4. General Responsibilities and Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-07-09

    The material presented in this guide provides suggestions and acceptable ways of implementing DOE M 435.1-1 and should not be viewed as additional or mandatory requirements. The objective of the guide is to ensure that responsible individuals understand what is necessary and acceptable for implementing the requirements of DOE M 435.1-1.

  5. Emissions from In-Use NG, Propane, and Diesel Fueled Heavy Duty Vehicles |

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy Emissions tests of in-use heavy-duty vehicles showed that, natural gas- and propane-fueled vehicles have high emissions of NH3 and CO, compared to diesel vehicles, while meeting certification requirements PDF icon deer11_johnson.pdf More Documents & Publications Vehicle Technologies Office Merit Review 2015: Cummins-ORNL\FEERC Emissions CRADA: NOx Control & Measurement Technology for Heavy-Duty Diesel Engines, Self-Diagnosing SmartCatalyst Systems Vehicle

  6. Characterizing Test Methods and Emissions Reduction Performance...

    Broader source: Energy.gov (indexed) [DOE]

    Evaluation of in-use DPFs shows levels of reduction within in-use testing objectives: PM emission reductions >90%, elementalblack carbon reduction of 99%, and retrofit ...

  7. Gas Test Loop Booster Fuel Hydraulic Testing

    SciTech Connect (OSTI)

    Gas Test Loop Hydraulic Testing Staff

    2006-09-01

    The Gas Test Loop (GTL) project is for the design of an adaptation to the Advanced Test Reactor (ATR) to create a fast-flux test space where fuels and materials for advanced reactor concepts can undergo irradiation testing. Incident to that design, it was found necessary to make use of special booster fuel to enhance the neutron flux in the reactor lobe in which the Gas Test Loop will be installed. Because the booster fuel is of a different composition and configuration from standard ATR fuel, it is necessary to qualify the booster fuel for use in the ATR. Part of that qualification is the determination that required thermal hydraulic criteria will be met under routine operation and under selected accident scenarios. The Hydraulic Testing task in the GTL project facilitates that determination by measuring flow coefficients (pressure drops) over various regions of the booster fuel over a range of primary coolant flow rates. A high-fidelity model of the NW lobe of the ATR with associated flow baffle, in-pile-tube, and below-core flow channels was designed, constructed and located in the Idaho State University Thermal Fluids Laboratory. A circulation loop was designed and constructed by the university to provide reactor-relevant water flow rates to the test system. Models of the four booster fuel elements required for GTL operation were fabricated from aluminum (no uranium or means of heating) and placed in the flow channel. One of these was instrumented with Pitot tubes to measure flow velocities in the channels between the three booster fuel plates and between the innermost and outermost plates and the side walls of the flow annulus. Flow coefficients in the range of 4 to 6.5 were determined from the measurements made for the upper and middle parts of the booster fuel elements. The flow coefficient for the lower end of the booster fuel and the sub-core flow channel was lower at 2.3.

  8. ARM - Reporting Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    required to report to the DOE ARM Program Director, to the DOE's Office of Biological and Environmental Research, and to the White House Office of Management and Budget. A primary...

  9. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an...

  10. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do...

  11. Green Building Requirement

    Broader source: Energy.gov [DOE]

    The new standards are phased in over the course of several years with publicly-owned buildings being the first required to comply. All new construction and substantial improvements of non...

  12. Requirements for security signalling

    SciTech Connect (OSTI)

    Pierson, L.G.; Tarman, T.D.

    1995-02-05

    There has been some interest lately in the need for ``authenticated signalling``, and the development of signalling specifications by the ATM Forum that support this need. The purpose of this contribution is to show that if authenticated signalling is required, then supporting signalling facilities for directory services (i.e. key management) are also required. Furthermore, this contribution identifies other security related mechanisms that may also benefit from ATM-level signalling accommodations. For each of these mechanisms outlined here, an overview of the signalling issues and a rough cut at the required fields for supporting Information Elements are provided. Finally, since each of these security mechanisms are specified by a number of different standards, issues pertaining to the selection of a particular security mechanism at connection setup time (i.e. specification of a required ``Security Quality of Service``) are also discussed.

  13. Promulgating Nuclear Safety Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-05-15

    Applies to all Nuclear Safety Requirements Adopted by the Department to Govern the Conduct of its Nuclear Activities. Cancels DOE P 410.1. Canceled by DOE N 251.85.

  14. Selected Guidance & Requirements

    Broader source: Energy.gov [DOE]

    This page contains the most requested NEPA guidance and requirement documents and those most often recommended by the Office of NEPA Policy and Compliance. Documents are listed by agency, in...

  15. Entry/Exit Port testing, test report

    SciTech Connect (OSTI)

    Winkelman, R.H.

    1993-05-01

    The Waste Receiving and Processing Module I (WRAP-1) facility must have the ability to allow 55-gallon drums to enter and exit glovebox enclosures. An Entry/Exit Port (Appendix 1, Figure 1), designed by United Engineers and Constructors (UE&C), is one method chosen for drum transfer. The Entry/Exit Port is to be used for entry of 55-gallon drums into both process entry gloveboxes, exit of 55-gallon drum waste pucks from the low-level waste (LLW) glovebox, and loadout of waste from the restricted waste management glovebox. The Entry/Exit Port relies on capture velocity air flow and a neoprene seal to provide alpha confinement when the Port is in the open and closed positions, respectively. Since the glovebox is in a slight vacuum, air flow is directed into the glovebox through the space between the overpack drum and glovebox floor. The air flow is to direct any airborne contamination into the glovebox. A neoprene seal is used to seal the Port door to the glovebox floor, thus maintaining confinement in the closed position. Entry/Exit Port testing took place February 17, 1993, through April 14, 1993, in the 305 building of Westinghouse Hanford Company. Testing was performed in accordance with the Entry/Exit Port Testing Test Plan, document number WHC-SD-WO26-TP-005. A prototype Entry/Exit Port built at the Hanford Site was tested using fluorescent paint pigment and smoke candles as simulant contaminants. This test report is an interim test report. Further developmental testing is required to test modifications made to the Port as the original design of the Port did not provide complete confinement during all stages of operation.

  16. Regulators, Requirements, Statutes

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Regulators, Requirements, Statutes Regulators, Requirements, Statutes The Laboratory must comply with environmental laws and regulations that apply to Laboratory operations. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Environmental laws and regulations LANL complies with more than 30 state and federal regulations and policies designed to protect human health and the environment. Regulators Regulators Environmental

  17. Mechanical Testing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management ...

  18. Battery Testing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management ...

  19. Experimental Testing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management ...

  20. Automotive Li-ion Battery Cooling Requirements | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Automotive Li-ion Battery Cooling Requirements Presents thermal management of lithium-ion ... Overview and Progress of the Battery Testing, Analysis, and Design Activity Vehicle ...

  1. Amount of Zeolite Required to Meet the Constraints Established...

    Office of Environmental Management (EM)

    of Zeolite Required to Meet the Constraints Established by the Energetic Materials Research and Testing Center (EMRTC) Report RF 10-13: Application of Los Alamos National...

  2. NP Science Network Requirements

    SciTech Connect (OSTI)

    Dart, Eli; Rotman, Lauren; Tierney, Brian

    2011-08-26

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the U.S. Department of Energy (DOE) Office of Science (SC), the single largest supporter of basic research in the physical sciences in the United States. To support SC programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In August 2011, ESnet and the Office of Nuclear Physics (NP), of the DOE SC, organized a workshop to characterize the networking requirements of the programs funded by NP. The requirements identified at the workshop are summarized in the Findings section, and are described in more detail in the body of the report.

  3. Requirements | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Requirements Students must earn a total of 11 points from the following options: Please note: To receive points toward the certificate, student are required to submit...

  4. Data Crosscutting Requirements Review

    SciTech Connect (OSTI)

    Kleese van Dam, Kerstin; Shoshani, Arie; Plata, Charity

    2013-04-01

    In April 2013, a diverse group of researchers from the U.S. Department of Energy (DOE) scientific community assembled to assess data requirements associated with DOE-sponsored scientific facilities and large-scale experiments. Participants in the review included facilities staff, program managers, and scientific experts from the offices of Basic Energy Sciences, Biological and Environmental Research, High Energy Physics, and Advanced Scientific Computing Research. As part of the meeting, review participants discussed key issues associated with three distinct aspects of the data challenge: 1) processing, 2) management, and 3) analysis. These discussions identified commonalities and differences among the needs of varied scientific communities. They also helped to articulate gaps between current approaches and future needs, as well as the research advances that will be required to close these gaps. Moreover, the review provided a rare opportunity for experts from across the Office of Science to learn about their collective expertise, challenges, and opportunities. The "Data Crosscutting Requirements Review" generated specific findings and recommendations for addressing large-scale data crosscutting requirements.

  5. Requirements for Xenon International

    SciTech Connect (OSTI)

    Hayes, James C.; Ely, James H.; Haas, Derek A.; Harper, Warren W.; Heimbigner, Tom R.; Hubbard, Charles W.; Humble, Paul H.; Madison, Jill C.; Morris, Scott J.; Panisko, Mark E.; Ripplinger, Mike D.; Stewart, Timothy L.

    2013-09-26

    This document defines the requirements for the new Xenon International radioxenon system. The output of this project will be a Pacific Northwest National Laboratory (PNNL) developed prototype and a manufacturer-developed production prototype. The two prototypes are intended to be as close to matching as possible; this will be facilitated by overlapping development cycles and open communication between PNNL and the manufacturer.

  6. Contractor Legal Management Requirements

    Broader source: Energy.gov [DOE]

    The purpose of this flash is to inform you of the issuance of two new Acquisition Guide Chapters, Chapters 70-31 C and 31.3, both titled "Contractor Legal Management Requirements." (Chapter 31.3 simply refers you to Chapter 70-31 C.)

  7. Prematurely terminated slug tests

    SciTech Connect (OSTI)

    Karasaki, K. )

    1990-07-01

    A solution of the well response to a prematurely terminated slug test (PTST) is presented. The advantages of a PTST over conventional slug tests are discussed. A systematized procedure of a PTST is proposed, where a slug test is terminated in the midpoint of the flow point, and the subsequent shut-in data is recorded and analyzed. This method requires a downhole shut-in device and a pressure transducer, which is no more than the conventional deep-well slug testing. As opposed to slug tests, which are ineffective when a skin is present, more accurate estimate of formation permeability can be made using a PTST. Premature termination also shortens the test duration considerably. Because in most cases no more information is gained by completing a slug test to the end, the author recommends that conventional slug tests be replaced by the premature termination technique. This study is part of an investigation of the feasibility of geologic isolation of nuclear wastes being carried out by the US Department of Energy and the National Cooperative for the Storage of Radioactive Waste of Switzerland.

  8. Transportation Infrastructure Requirement Resources | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Infrastructure Requirement Resources Transportation Infrastructure Requirement Resources ... Establish Alternative Fuel Infrastructure. Back to Transportation Policies and Programs.

  9. Experimental Testing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Testing - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs Advanced Nuclear Energy

  10. Mechanical Testing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Testing - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs Advanced Nuclear Energy

  11. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an Experiment Safety Sheet? (Do this upon receiving beam time.) Complete Safety Training? Bring and Use Electrical Equipment at the ALS? Determine what Personal Protective Equipment (PPE) to Wear? Get Authorization to Work with Lasers at the ALS? Ship Radioactive Materials to LBNL for Use at the ALS? Ship Samples

  12. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an Experiment Safety Sheet? (Do this upon receiving beam time.) Complete Safety Training? Bring and Use Electrical Equipment at the ALS? Determine what Personal Protective Equipment (PPE) to Wear? Get Authorization to Work with Lasers at the ALS? Ship Radioactive Materials to LBNL for Use at the ALS? Ship Samples

  13. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an Experiment Safety Sheet? (Do this upon receiving beam time.) Complete Safety Training? Bring and Use Electrical Equipment at the ALS? Determine what Personal Protective Equipment (PPE) to Wear? Get Authorization to Work with Lasers at the ALS? Ship Radioactive Materials to LBNL for Use at the ALS? Ship Samples

  14. LASSO* - Science Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LASSO* - Science Requirements *LES ARM Symbiotic Simulation and Observation (LASSO) workflow Andy Vogelmann 1 , William I Gustafson Jr 2 Zhijin Li 3,4 , Xiaoping Cheng 3 , Satoshi Endo 1 , Tami Toto 1 , and Heng Xiao 2 1 Brookhaven National Laboratory 2 Pacific Northwest National Laboratory 3 University of California Los Angeles 4 NASA Jet Propulsion Laboratory And TONS of people from the rest of ARM! LASSO Webpage: http://www.arm.gov/science/themes/lasso LASSO e-mail list sign up:

  15. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an Experiment Safety Sheet? (Do this upon receiving beam time.) Complete Safety Training? Bring and Use Electrical Equipment at the ALS? Determine what Personal Protective Equipment (PPE) to Wear? Get Authorization to Work with Lasers at the ALS? Ship Radioactive Materials to LBNL for Use at the ALS? Ship Samples

  16. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an Experiment Safety Sheet? (Do this upon receiving beam time.) Complete Safety Training? Bring and Use Electrical Equipment at the ALS? Determine what Personal Protective Equipment (PPE) to Wear? Get Authorization to Work with Lasers at the ALS? Ship Radioactive Materials to LBNL for Use at the ALS? Ship Samples

  17. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an Experiment Safety Sheet? (Do this upon receiving beam time.) Complete Safety Training? Bring and Use Electrical Equipment at the ALS? Determine what Personal Protective Equipment (PPE) to Wear? Get Authorization to Work with Lasers at the ALS? Ship Radioactive Materials to LBNL for Use at the ALS? Ship Samples

  18. DOE Testing Reveals Samsung Refrigerator Does Not Meet Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reveals Samsung Refrigerator Does Not Meet Energy Star Requirements DOE Testing Reveals Samsung Refrigerator Does Not Meet Energy Star Requirements March 16, 2010 - 4:28pm Addthis...

  19. Required Annual Notices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A Token Requesting A Token RSA_SecurID_SID800.jpg Step One - Registering with the DOE's Management Information System (MIS) Before you request a DOE Digital Identity, you must register in DOE's Management Information System (MIS). Please note that DOE Federal employees are already registered and do not need to complete this step. They may skip to step two. During the registration process, you will be required to select a DOE sponsor. Your sponsor is the DOE employee who certifies that you have a

  20. BES Science Network Requirements

    SciTech Connect (OSTI)

    Biocca, Alan; Carlson, Rich; Chen, Jackie; Cotter, Steve; Tierney, Brian; Dattoria, Vince; Davenport, Jim; Gaenko, Alexander; Kent, Paul; Lamm, Monica; Miller, Stephen; Mundy, Chris; Ndousse, Thomas; Pederson, Mark; Perazzo, Amedeo; Popescu, Razvan; Rouson, Damian; Sekine, Yukiko; Sumpter, Bobby; Dart, Eli; Wang, Cai-Zhuang -Z; Whitelam, Steve; Zurawski, Jason

    2011-02-01

    The Energy Sciences Network (ESnet) is the primary provider of network connectivityfor the US Department of Energy Office of Science (SC), the single largest supporter of basic research in the physical sciences in the United States. In support of the Office ofScience programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years.

  1. Background information on RSO Test Deeming Guidance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    information on RSO Test Deeming Guidance BPA has now had over two years of experience implementing Slice under the Regional Dialogue contract. Slice product customers are required...

  2. Risk-informed inservice test activities at the NRC

    SciTech Connect (OSTI)

    Fischer, D.; Cheok, M.; Hsia, A.

    1996-12-01

    The operational readiness of certain safety-related components is vital to the safe operation of nuclear power plants. Inservice testing (IST) is one of the mechanisms used by licensees to ensure this readiness. In the past, the type and frequency of IST have been based on the collective best judgment of the NRC and industry in an ASME Code consensus process and NRC rulemaking process. Furthermore, IST requirements have not explicitly considered unique component and system designs and contribution to overall plant risk. Because of the general nature of ASME Code test requirements and non-reliance on risk estimates, current IST requirements may not adequately emphasize testing those components that are most important to safety and may overly emphasize testing of less safety significant components. Nuclear power plant licensees are currently interested in optimizing testing by applying resources in more safety significant areas and, where appropriate, reducing measures in less safety-significant areas. They are interested in maintaining system availability and reducing overall maintenance costs in ways that do not adversely affect safety. The NRC has been interested in using probabilistic, as an adjunct to deterministic, techniques to help define the scope, type and frequency of IST. The development of risk-informed IST programs has the potential to optimize the use of NRC and industry resources without adverse affect on safety.

  3. ETA-HTP06 - Braking Test

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    HTP06 Revision 2 Effective October 1, 2007 Braking Test Prepared by Electric ... Activity Requirements 3 5.3 Dry Controlled Test 4 6. Glossary 5 7. References 7 Appendices ...

  4. Accelerated Stress Testing, Qualification Testing, HAST, Field...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Accelerated Stress Testing, Qualification Testing, HAST, Field Experience Accelerated Stress Testing, Qualification Testing, HAST, Field Experience This presentation, which was the ...

  5. Match Pumps to System Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Match Pumps to System Requirements Match Pumps to System Requirements This tip sheet describes how to correct imbalanced pumping systems and improve system efficiency. PUMPING SYSTEMS TIP SHEET #6 PDF icon Match Pumps to System Requirements (October 2005) More Documents & Publications Test for Pumping System Efficiency Reduce Pumping Costs Through Optimum Pipe Sizing Maintain Pumping Systems Effectively

  6. Test Cryostat Nozzle

    SciTech Connect (OSTI)

    Wintercorn, S.J.; /Fermilab

    1986-05-22

    This report contains the results of calculations for a resized nozzle on the D-Zero test cryostat. The nozzle neck in the inner vessel with be 6-inch schedule 10S pipe and 8-inch 10S will be used for the outer vessel. On top of the nozzle will be placed the D-Zero Endcap Calorimeter signal board feedthru dewar box. This box weighs approximately 250 lbs but the weight was conservatively taken to be 500 lbs. The allowable pressure from above does not exceed 15 psig per ASME, but it does exceed 7.5 psig required by CGA-341 therefore reinforcement is not required. Note that the reinforcement provided by the nozzle neck in combination with the excess shell thickness is probably sufficient to satisfy the ASME requirements.

  7. Testing Web Application Accessibility | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Testing Web Application Accessibility Testing Web Application Accessibility Section 508 requires all federal agencies to make their electronic and information technologies accessible to people with disabilities. EERE has specific guidelines for testing applications for accessibility. Use this checklist to see if your applications meet Section 508 requirements. File Testing Web Application Accessibility More Documents & Publications Web Content Analysis and Inventories: Template and FY 2014

  8. Tracers and Tracer Testing: Design, Implementation, Tracer Selection...

    Office of Scientific and Technical Information (OSTI)

    Conducting a successful tracer test requires adhering to a set of steps. The steps include identifying appropriate and achievable test goals, identifying tracers with the ...

  9. Equipment Operational Requirements

    SciTech Connect (OSTI)

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  10. Microgrid Testing

    SciTech Connect (OSTI)

    Shirazi, M.; Kroposki, B.

    2012-01-01

    With the publication of IEEE 1574.4 Guide for Design, Operation, and Integration of Distributed Resource Island Systems with Electric Power Systems, there is an increasing amount of attention on not only the design and operations of microgrids, but also on the proper operation and testing of these systems. This standard provides alternative approaches and good practices for the design, operation, and integration of microgrids. This includes the ability to separate from and reconnect to part of the utility grid while providing power to the islanded power system. This presentation addresses the industry need to develop standardized testing and evaluation procedures for microgrids in order to assure quality operation in the grid connected and islanded modes of operation.

  11. communications requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Utilities to Inform Federal Smart Grid Policy Re: NBP RFI: Communications Requirements NBP RFI: Communications Requirements- Comments of Lake Region Electric Cooperative- Minnesota

  12. Competition Requirements | Department of Energy

    Energy Savers [EERE]

    PDF icon Competition Requirements More Documents & Publications Microsoft Word - AG Chapter 6 1 Nov 2010 AcqGuide 5.2-OPAM Chapter 6 - Competition Requirements

  13. Forklift Test

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Forest Products (2010 MECS) Forest Products (2010 MECS) Manufacturing Energy and Carbon Footprint for Forest Products Sector (NAICS 321, 322) Energy use data source: 2010 EIA MECS (with adjustments) Footprint Last Revised: February 2014 View footprints for other sectors here. Manufacturing Energy and Carbon Footprint PDF icon Forest Products More Documents & Publications MECS 2006 - Forest Products Cement (2010 MECS) Transportation

    Forklift Safety Test Instructions: All Training and

  14. BGE Communications Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BGE Communications Requirements BGE Communications Requirements Chart of BGE Communications Requirements PDF icon BGE Communications Requirements More Documents & Publications ...

  15. Cyclotron Requirements for Multi-disciplinary Programs

    SciTech Connect (OSTI)

    Armbruster, John M.

    2009-03-10

    As time has passed, the various Cyclotron programs have changed over the years. In the ''early'' times of Cyclotron operations, the emphasis was on a more single sided approach such as Clinical or Research or Production. However, as time passed, the disciplines became more interconnected until today, it is unusual to have a Cyclotron and only have a single program unless it is pure production. More and more, especially in public areas such as Universities or Health Centers, you are seeing programs that do all three types of disciplines: Production; Clinical or Patient Diagnostics and/or Treatment; and Research, either in the development and manufacture of new Radio-Isotopes, new Diagnostic or Therapeutic Compound Development, or Clinical Research involving subject testing. While all three of these disciplines have some common requirements, they also have some very different requirements that may be completely counterproductive to other requirements. For a program where all three disciplines are required to be successful, it is necessary come up with some sort of compromise that meets all the various requirements. During this talk, we will try to identify some of these different requirements for the various disciplines and how these could impact the other disciplines. We will also discuss ideas for some possible compromises that might reduce the conflict between the various disciplines.

  16. Current Test Procedure Waivers | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Current Test Procedure Waivers Current Test Procedure Waivers The U.S. Department of Energy's (DOE) regulations for covered products permit a person to seek a waiver, or an interim waiver, from the test procedure requirements for covered appliances and commercial equipment if certain criteria are satisfied. Regulations applicable to test procedure waivers for appliances can be found at 10 CFR 430.27; those applicable to test procedure waivers for commercial equipment are at 10 CFR 431.401. This

  17. GEOCHEMICAL TESTING AND MODEL DEVELOPMENT - RESIDUAL TANK WASTE TEST PLAN

    SciTech Connect (OSTI)

    CANTRELL KJ; CONNELLY MP

    2010-03-09

    This Test Plan describes the testing and chemical analyses release rate studies on tank residual samples collected following the retrieval of waste from the tank. This work will provide the data required to develop a contaminant release model for the tank residuals from both sludge and salt cake single-shell tanks. The data are intended for use in the long-term performance assessment and conceptual model development.

  18. Validation of International Atomic Energy Agency Equipment Performance Requirements

    SciTech Connect (OSTI)

    Chiaro, PJ

    2004-02-17

    Performance requirements and testing protocols are needed to ensure that equipment used by the International Atomic Energy Agency (IAEA) is reliable. Oak Ridge National Laboratory (ORNL), through the US Support Program, tested equipment to validate performance requirements protocols used by the IAEA for the subject equipment categories. Performance protocol validation tests were performed in the Environmental Effects Laboratory in the categories for battery, DC power supply, and uninterruptible power supply (UPS). Specific test results for each piece of equipment used in the validation process are included in this report.

  19. ETA-HAC02 - Control of Test Conduct

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Control of Test Conduct Prepared by Electric Transportation Applications Prepared by: ... 5 6.0 Activity Requirements 5 6.1 Test Activities 5 6.2 Test Exceptions 6 7.0 ...

  20. TESTING LED COLOR-TUNABLE PRODUCTS | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    TESTING LED COLOR-TUNABLE PRODUCTS TESTING LED COLOR-TUNABLE PRODUCTS Cover of CALiPER Report 23. New product capabilities and performance variables require new test methods to be ...

  1. Regulatory Requirements | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Regulatory Requirements Executive Order 13423, Strengthening Federal Environment, Energy, and Transportation Management (January 26, 2007) and Executive Order 13514, Federal...

  2. 2006 Final Transmission Proposal: Revenue Requirements Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    2005-06-01

    The purpose of the Revenue Requirement Study (Study) is to establish the level of revenues needed from rates for Bonneville Power Administration's (BPA's) transmission and ancillary services to recover, in accordance with sound business principles, costs associated with the transmission of electric power over the Federal Columbia River Transmission System (FCRTS). The FCRTS is part of the larger Federal Columbia River Power System (FCRPS) which also includes the hydroelectric, multipurpose facilities constructed and operated by the U.S. Army Corps of Engineers and the Bureau of Reclamation in the Pacific Northwest. The FCRPS costs that are not included in the FCRTS costs are funded and repaid through BPA power rates. The transmission revenue requirements herein include: recovery of the Federal investment in transmission and transmission-related assets; the operations and maintenance (O&M) and other annual expenses associated with the provision of transmission and ancillary services; the cost of generation inputs for ancillary services and other between business-line services necessary for the transmission of power; and all other transmission-related costs incurred by the Administrator. The cost evaluation period for this rate proposal includes Fiscal Years (FYs) 2005-2007, the period extending from the last year for which historical information is available through the proposed rate test period. The Study includes the transmission revenue requirements for the rate test period, FYs 2006-2007 (Rate Period) and the results of transmission repayment studies. This Study outlines the policies, forecasts, assumptions, and calculations used to determine BPA's transmission revenue requirements. Legal requirements are summarized in Chapter 5 of this Study. The Revenue Requirement Study Documentation (Documentation), TR-06-FS-BPA-01A, contains key technical assumptions and calculations, the results of the transmission repayment studies, and a further explanation of the repayment inputs and its outputs.

  3. Duct Leakage Repeatability Testing

    SciTech Connect (OSTI)

    Walker, Iain; Sherman, Max

    2014-08-01

    The purpose of this report is to evaluate the repeatability of the three most significant measurement techniques for duct leakage using data from the literature and recently obtained field data. We will also briefly discuss the first two factors. The main question to be answered by this study is to determine if differences in the repeatability of these tests methods is sufficient to indicate that any of these methods is so poor that it should be excluded from consideration as an allowed procedure in codes and standards. The three duct leak measurement methods assessed in this report are the two duct pressurization methods that are commonly used by many practitioners and the DeltaQ technique. These are methods B, C and A, respectively of the ASTM E1554 standard. Although it would be useful to evaluate other duct leak test methods, this study focused on those test methods that are commonly used and are required in various test standards, such as BPI (2010), RESNET (2014), ASHRAE 62.2 (2013), California Title 24 (CEC 2012), DOE Weatherization and many other energy efficiency programs.

  4. Nonproliferation Test and Evaluation Complex - NPTEC

    ScienceCinema (OSTI)

    None

    2015-01-09

    The Nonproliferation Test and Evaluation Complex, or NPTEC, is the world's largest facility for open air testing of hazardous toxic materials and biological simulants. NPTEC is used for testing, experimentation, and training for technologies that require the release of toxic chemicals or biological simulants into the environment.

  5. Forensic Drug Testing Custody and Control Form

    Broader source: Energy.gov [DOE]

    Forensic Drug Testing Custody and Control Form. A copy of the drug testing custody and control form for DOE contractors to use to comply with the drug testing requirements in 10 CFR part 707, Workplace Substance Abuse Programs at DOE Sites.

  6. Nonproliferation Test and Evaluation Complex - NPTEC

    SciTech Connect (OSTI)

    2014-11-10

    The Nonproliferation Test and Evaluation Complex, or NPTEC, is the world's largest facility for open air testing of hazardous toxic materials and biological simulants. NPTEC is used for testing, experimentation, and training for technologies that require the release of toxic chemicals or biological simulants into the environment.

  7. test | Department of Energy

    Office of Environmental Management (EM)

    test test test PDF icon test More Documents & Publications 2009 ECR FINAL REPORT 2010 Final ECR 2008 Report Environmental Conflict Resolution

  8. Duct Leakage Repeatability Testing

    SciTech Connect (OSTI)

    Walker, Iain; Sherman, Max

    2014-01-01

    Duct leakage often needs to be measured to demonstrate compliance with requirements or to determine energy or Indoor Air Quality (IAQ) impacts. Testing is often done using standards such as ASTM E1554 (ASTM 2013) or California Title 24 (California Energy Commission 2013 & 2013b), but there are several choices of methods available within the accepted standards. Determining which method to use or not use requires an evaluation of those methods in the context of the particular needs. Three factors that are important considerations are the cost of the measurement, the accuracy of the measurement and the repeatability of the measurement. The purpose of this report is to evaluate the repeatability of the three most significant measurement techniques using data from the literature and recently obtained field data. We will also briefly discuss the first two factors. The main question to be answered by this study is to determine if differences in the repeatability of these tests methods is sufficient to indicate that any of these methods is so poor that it should be excluded from consideration as an allowed procedure in codes and standards.

  9. Data Requirements from NERSC Requirements Reviews Richard Gerber...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Energy Scientists represented by the NERSC user community have growing requirements for data storage, IO bandwidth, networking bandwidth, and data software and services. ...

  10. Emissions from In-Use NG, Propane, and Diesel Fueled Heavy Duty...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    In-Use NG, Propane, and Diesel Fueled Heavy Duty Vehicles Emissions from In-Use NG, Propane, and Diesel Fueled Heavy Duty Vehicles Emissions tests of in-use heavy-duty vehicles ...

  11. Managing System of Systems Requirements with a Requirements Screening Group

    SciTech Connect (OSTI)

    Ronald R. Barden

    2012-07-01

    Figuring out an effective and efficient way to manage not only your Requirements Baseline, but also the development of all your individual requirements during a Programs/Projects Conceptual and Development Life Cycle Stages can be both daunting and difficult. This is especially so when you are dealing with a complex and large System of Systems (SoS) Program with potentially thousands and thousands of Top Level Requirements as well as an equal number of lower level System, Subsystem and Configuration Item requirements that need to be managed. This task is made even more overwhelming when you have to add in integration with multiple requirements development teams (e.g., Integrated Product Development Teams (IPTs)) and/or numerous System/Subsystem Design Teams. One solution for tackling this difficult activity on a recent large System of Systems Program was to develop and make use of a Requirements Screening Group (RSG). This group is essentially a Team made up of co-chairs from the various Stakeholders with an interest in the Program of record that are enabled and accountable for Requirements Development on the Program/Project. The RSG co-chairs, often with the help of individual support team, work together as a Program Board to monitor, make decisions on, and provide guidance on all Requirements Development activities during the Conceptual and Development Life Cycle Stages of a Program/Project. In addition, the RSG can establish and maintain the Requirements Baseline, monitor and enforce requirements traceability across the entire Program, and work with other elements of the Program/Project to ensure integration and coordination.

  12. Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Regular participation in a student green group may also earn credit. Create a PARC Education & Outreach Video Earn 2 points Work with PARC Multimedia Specialist Dan Allen ...

  13. Benefits Forms & Required Notices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Benefits Forms & Required Notices Benefits Forms & Required Notices A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contacts Benefits Office (505) 667-1806 Email Benefits Forms & Required Notices Forms Benefits Enrollment Form, 1751a (pdf) Declaration of Domestic Partnership, 1925a (pdf) Declaration of Legal Ward as Eligible Dependent, 3028 (pdf) Declaration that Enrolled Dependent Meets IRS

  14. MST Filterability Tests

    SciTech Connect (OSTI)

    Poirier, M. R.; Burket, P. R.; Duignan, M. R.

    2015-03-12

    The Savannah River Site (SRS) is currently treating radioactive liquid waste with the Actinide Removal Process (ARP) and the Modular Caustic Side Solvent Extraction Unit (MCU). The low filter flux through the ARP has limited the rate at which radioactive liquid waste can be treated. Recent filter flux has averaged approximately 5 gallons per minute (gpm). Salt Batch 6 has had a lower processing rate and required frequent filter cleaning. Savannah River Remediation (SRR) has a desire to understand the causes of the low filter flux and to increase ARP/MCU throughput. In addition, at the time the testing started, SRR was assessing the impact of replacing the 0.1 micron filter with a 0.5 micron filter. This report describes testing of MST filterability to investigate the impact of filter pore size and MST particle size on filter flux and testing of filter enhancers to attempt to increase filter flux. The authors constructed a laboratory-scale crossflow filter apparatus with two crossflow filters operating in parallel. One filter was a 0.1 micron Mott sintered SS filter and the other was a 0.5 micron Mott sintered SS filter. The authors also constructed a dead-end filtration apparatus to conduct screening tests with potential filter aids and body feeds, referred to as filter enhancers. The original baseline for ARP was 5.6 M sodium salt solution with a free hydroxide concentration of approximately 1.7 M.3 ARP has been operating with a sodium concentration of approximately 6.4 M and a free hydroxide concentration of approximately 2.5 M. SRNL conducted tests varying the concentration of sodium and free hydroxide to determine whether those changes had a significant effect on filter flux. The feed slurries for the MST filterability tests were composed of simple salts (NaOH, NaNO2, and NaNO3) and MST (0.2 – 4.8 g/L). The feed slurry for the filter enhancer tests contained simulated salt batch 6 supernate, MST, and filter enhancers.

  15. Chart of communications requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chart of communications requirements Chart of communications requirements Chart of communications requirements for BGE PDF icon Chart of communications requirements More Documents ...

  16. Test Plan: WIPP bin-scale CH TRU waste tests

    SciTech Connect (OSTI)

    Molecke, M.A.

    1990-08-01

    This WIPP Bin-Scale CH TRU Waste Test program described herein will provide relevant composition and kinetic rate data on gas generation and consumption resulting from TRU waste degradation, as impacted by synergistic interactions due to multiple degradation modes, waste form preparation, long-term repository environmental effects, engineered barrier materials, and, possibly, engineered modifications to be developed. Similar data on waste-brine leachate compositions and potentially hazardous volatile organic compounds released by the wastes will also be provided. The quantitative data output from these tests and associated technical expertise are required by the WIPP Performance Assessment (PA) program studies, and for the scientific benefit of the overall WIPP project. This Test Plan describes the necessary scientific and technical aspects, justifications, and rational for successfully initiating and conducting the WIPP Bin-Scale CH TRU Waste Test program. This Test Plan is the controlling scientific design definition and overall requirements document for this WIPP in situ test, as defined by Sandia National Laboratories (SNL), scientific advisor to the US Department of Energy, WIPP Project Office (DOE/WPO). 55 refs., 16 figs., 19 tabs.

  17. ESPC ENABLE Final Proposal Requirements

    Broader source: Energy.gov [DOE]

    Document describes the final proposal requirements for consideration by an energy service company (ESCO) for an agency’s Request for Quote/Notice of Opportunity or final proposal. If selected to perform a site investment grade audit, the ESCO will be required to present the findings from the IGA and a project price to the agency in the form of a final proposal.

  18. Catalytic oxidizers and Title V requirements

    SciTech Connect (OSTI)

    Uberoi, M.; Rach, S.E.

    1999-07-01

    Catalytic oxidizers have been used to reduce VOC emissions from various industries including printing, chemical, paint, coatings, etc. A catalytic oxidizer uses a catalyst to reduce the operating temperature for combustion to approximately 600 F, which is substantially lower than thermal oxidation unit. Title V requirements have renewed the debate on the best methods to assure compliance of catalytic oxidizers, with some suggesting the need for continuous emission monitoring equipment. This paper will discuss the various aspects of catalytic oxidation and consider options such as monitoring inlet/outlet temperatures, delta T across the catalyst, periodic laboratory testing of catalyst samples, and preventive maintenance procedures as means of assuring continuous compliance.

  19. Automotive Turbocharging: Industrial Requirements and Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Turbocharging: Industrial Requirements and Technology Developments Automotive Turbocharging: Industrial Requirements and Technology Developments Significant improvements in ...

  20. Vermont Source Testing Review | Open Energy Information

    Open Energy Info (EERE)

    ReviewLegal Abstract This form initiates the review and approval process for required studies and testing to be conducted on source(s) to serve Proposed or Existing Public...

  1. Two ENERGY STAR Products Fail Testing

    Broader source: Energy.gov [DOE]

    DOE testing has identified two additional models of home appliances that do not meet the ENERGY STAR Program’s energy efficiency requirements.  A refrigerator manufactured by the Perlick...

  2. LANSCE | Materials Test Station

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Training Office Contact Administrative nav background Materials Test Station dotline ... Materials Test Station: the Preferred Alternative When completed, the Materials Test ...

  3. CNP_TEST_SUITE

    Energy Science and Technology Software Center (OSTI)

    002854MLTPL00 Automated Nuclear Data Test Suite file:///usr/gapps/CNP_src/us/RR/test_suite_cz/cnp_test_suite

  4. SLAC Accelerator Test Facilities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FACET & TF Careers & Education Archived FACET User Facility Quick Launch About FACET & Test Facilities Expand About FACET & Test Facilities FACET & Test Facilities User Portal...

  5. Test plan : reducing soft costs of rooftop solar installations attributed to structural considerations.

    SciTech Connect (OSTI)

    Dwyer, Stephen F.

    2013-05-01

    This test plan is a document that provides a systematic approach to the planned testing of rooftop structures to determine their actual load carrying capacity. This document identifies typical tests to be performed, the responsible parties for testing, the general feature of the tests, the testing approach, test deliverables, testing schedule, monitoring requirements, and environmental and safety compliance.

  6. Meeting Federal Energy Security Requirements

    Broader source: Energy.gov [DOE]

    Presentation—given at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting—discusses the opportunity to increase the scope of federal-utility partnerships for meeting energy security requirements.

  7. In-place HEPA filter penetration test

    SciTech Connect (OSTI)

    Bergman, W.; Wilson, kK.; Elliott, J.; Bettencourt, B.; Slawski, J.W.

    1997-01-01

    We have demonstrated the feasibility of conducting penetration tests on high efficiency particulate air (HEPA) filters as installed in nuclear ventilation systems. The in-place penetration test, which is designed to yield equivalent penetration measurements as the standard DOP efficiency test, is based on measuring the aerosol penetration of the filter installation as a function of particle size using a portable laser particle counter. This in-place penetration test is compared to the current in-place leak test using light scattering photometers for single HEPA filter installations and for HEPA filter plenums using the shroud method. Test results show the in-place penetration test is more sensitive than the in-place leak test, has a similar operating procedure, but takes longer to conduct. Additional tests are required to confirm that the in-place penetration test yields identical results as the standard dioctyl phthalate (DOP) penetration test for HEPA filters with controlled leaks in the filter and gasket and duct by-pass leaks. Further development of the procedure is also required to reduce the test time before the in- place penetration test is practical.

  8. Baseline LAW Glass Formulation Testing

    SciTech Connect (OSTI)

    Kruger, Albert A.; Mooers, Cavin; Bazemore, Gina; Pegg, Ian L.; Hight, Kenneth; Lai, Shan Tao; Buechele, Andrew; Rielley, Elizabeth; Gan, Hao; Muller, Isabelle S.; Cecil, Richard

    2013-06-13

    The major objective of the baseline glass formulation work was to develop and select glass formulations that are compliant with contractual and processing requirements for each of the LAW waste streams. Other objectives of the work included preparation and characterization of glasses with respect to the properties of interest, optimization of sulfate loading in the glasses, evaluation of ability to achieve waste loading limits, testing to demonstrate compatibility of glass melts with melter materials of construction, development of glass formulations to support ILAW qualification activities, and identification of glass formulation issues with respect to contract specifications and processing requirements.

  9. HEP Science Network Requirements--Final Report

    SciTech Connect (OSTI)

    Bakken, Jon; Barczyk, Artur; Blatecky, Alan; Boehnlein, Amber; Carlson, Rich; Chekanov, Sergei; Cotter, Steve; Cottrell, Les; Crawford, Glen; Crawford, Matt; Dart, Eli; Dattoria, Vince; Ernst, Michael; Fisk, Ian; Gardner, Rob; Johnston, Bill; Kent, Steve; Lammel, Stephan; Loken, Stewart; Metzger, Joe; Mount, Richard; Ndousse-Fetter, Thomas; Newman, Harvey; Schopf, Jennifer; Sekine, Yukiko; Stone, Alan; Tierney, Brian; Tull, Craig; Zurawski, Jason

    2010-04-27

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In August 2009 ESnet and the Office of High Energy Physics (HEP), of the DOE Office of Science, organized a workshop to characterize the networking requirements of the programs funded by HEP. The International HEP community has been a leader in data intensive science from the beginning. HEP data sets have historically been the largest of all scientific data sets, and the communty of interest the most distributed. The HEP community was also the first to embrace Grid technologies. The requirements identified at the workshop are summarized below, and described in more detail in the case studies and the Findings section: (1) There will be more LHC Tier-3 sites than orginally thought, and likely more Tier-2 to Tier-2 traffic than was envisioned. It it not yet known what the impact of this will be on ESnet, but we will need to keep an eye on this traffic. (2) The LHC Tier-1 sites (BNL and FNAL) predict the need for 40-50 Gbps of data movement capacity in 2-5 years, and 100-200 Gbps in 5-10 years for HEP program related traffic. Other key HEP sites include LHC Tier-2 and Tier-3 sites, many of which are located at universities. To support the LHC, ESnet must continue its collaborations with university and international networks. (3) While in all cases the deployed 'raw' network bandwidth must exceed the user requirements in order to meet the data transfer and reliability requirements, network engineering for trans-Atlantic connectivity is more complex than network engineering for intra-US connectivity. This is because transoceanic circuits have lower reliability and longer repair times when compared with land-based circuits. Therefore, trans-Atlantic connectivity requires greater deployed bandwidth and diversity to ensure reliability and service continuity of the user-level required data transfer rates. (4) Trans-Atlantic traffic load and patterns must be monitored, and projections adjusted if necessary. There is currently a shutdown planned for the LHC in 2012 that may affect projections of trans-Atlantic bandwidth requirements. (5) There is a significant need for network tuning and troubleshooting during the establishment of new LHC Tier-2 and Tier-3 facilities. ESnet will work with the HEP community to help new sites effectively use the network. (6) SLAC is building the CCD camera for the LSST. This project will require significant bandwidth (up to 30Gbps) to NCSA over the next few years. (7) The accelerator modeling program at SLAC could require the movement of 1PB simulation data sets from the Leadership Computing Facilities at Argonne and Oak Ridge to SLAC. The data sets would need to be moved overnight, and moving 1PB in eight hours requires more than 300Gbps of throughput. This requirement is dependent on the deployment of analysis capabilities at SLAC, and is about five years away. (8) It is difficult to achieve high data transfer throughput to sites in China. Projects that need to transfer data in or out of China are encouraged to deploy test and measurement infrastructure (e.g. perfSONAR) and allow time for performance tuning.

  10. CASL Test Stand Experience

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Industry Test Stand Experience Stephen Hess, EPRI Heather Feldman, EPRI Brenden Mervin, .........1 2. Westinghouse Test Stand ......

  11. Control of Test Conduct

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Revision 1 Effective June 2008 Control of Test Conduct Prepared by Electric ......... 4 6.1 Test Activities ......

  12. Pratt Whitney Rocketdyne Testing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Battery Abuse Testing Laboratory Cylindrical Boiling Facility Distributed Energy Technology Lab Microsystems and Engineering Sciences Applications National Solar Thermal Test ...

  13. HEP/NP Requirements Review 2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HEP/NP Requirements Review 2013 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR Requirements Review 2015 Previous Reviews HEP/NP Requirements Review 2013 HEP Attendees 2013 FES Requirements Review 2014 BES Requirements Review 2014 Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1

  14. IHE material qualification tests description and criteria

    SciTech Connect (OSTI)

    Slape, R J

    1984-06-01

    This report describes the qualification tests presently being used at Pantex Plant, Lawrence Livermore National Laboratory, and Los Alamos National Laboratory that are required by the Department of Energy prior to the approval for an explosive as an Insensitive High Explosive (IHE) material. The acceptance criteria of each test for IHE qualification is also discussed. 5 references, 10 figures.

  15. Nevada Test Site Waste Acceptance Criteria (NTSWAC)

    SciTech Connect (OSTI)

    NNSA /NSO Waste Management Project

    2008-06-01

    This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, Nevada Test Site Waste Acceptance Criteria (NTSWAC). The NTSWAC provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive (LLW) and LLW Mixed Waste (MW) for disposal.

  16. Testing and inspecting lens by holographic means

    DOE Patents [OSTI]

    Hildebrand, Bernard P.

    1976-01-01

    Processes for the accurate, rapid and inexpensive testing and inspecting of oncave and convex lens surfaces through holographic means requiring no beamsplitters, mirrors or overpower optics, and wherein a hologram formed in accordance with one aspect of the invention contains the entire interferometer and serves as both a master and illuminating source for both concave and said convex surfaces to be so tested.

  17. Lens testing using total internal reflection holography

    DOE Patents [OSTI]

    Hildebrand, Bernard P.

    1976-12-14

    Accurate, rapid and inexpensive testing and inspecting of lens surfaces tugh holographic means requiring no beamsplitters, mirrors or overpower optics, and wherein a hologram formed in accordance with one aspect of the invention contains the entire interferometer and serves as both a master and illuminating source for both concave and convex surfaces to be so tested.

  18. AeroSys: Test Notice (2009)

    Broader source: Energy.gov [DOE]

    DOE issued a test notice to AeroSys, Inc., requiring the company to provide sample units for laboratory testing to determine the compliance of various models of central air conditioners and air conditioning heat pumps with the applicable energy conservation standards.

  19. Calibration curves for some standard Gap Tests

    SciTech Connect (OSTI)

    Bowman, A.L.; Sommer, S.C.

    1989-01-01

    The relative shock sensitivities of explosive compositions are commonly assessed using a family of experiments that can be described by the generic term ''Gap Test.'' Gap tests include a donor charge, a test sample, and a spacer, or gap, between two explosives charges. The donor charge, gap material, and test dimensions are held constant within each different version of the gap test. The thickness of the gap is then varied to find the value at which 50% of the test samples will detonate. The gap tests measure the ease with a high-order detonation can be established in the test explosive, or the ''detonability,'' of the explosive. Test results are best reported in terms of the gap thickness at the 50% point. It is also useful to define the shock pressure transmitted into the test sample at the detonation threshold. This requires calibrating the gap test in terms of shock pressure in the gap as a function of the gap thickness. It also requires a knowledge of the shock Hugoniot of the sample explosive. We used the 2DE reactive hydrodynamic code with Forest Fire burn rates for the donor explosives to calculate calibration curves for several gap tests. The model calculations give pressure and particle velocity on the centerline of the experimental set-up and provide information about the curvature and pulse width of the shock wave. 10 refs., 1 fig.

  20. Authorization basis requirements comparison report

    SciTech Connect (OSTI)

    Brantley, W.M.

    1997-08-18

    The TWRS Authorization Basis (AB) consists of a set of documents identified by TWRS management with the concurrence of DOE-RL. Upon implementation of the TWRS Basis for Interim Operation (BIO) and Technical Safety Requirements (TSRs), the AB list will be revised to include the BIO and TSRs. Some documents that currently form part of the AB will be removed from the list. This SD identifies each - requirement from those documents, and recommends a disposition for each to ensure that necessary requirements are retained when the AB is revised to incorporate the BIO and TSRs. This SD also identifies documents that will remain part of the AB after the BIO and TSRs are implemented. This document does not change the AB, but provides guidance for the preparation of change documentation.

  1. CANMET Gasifier Liner Coupon Material Test Plan

    SciTech Connect (OSTI)

    Mark Fitzsimmons; Alan Darby; Fred Widman

    2005-10-30

    The test plan detailed in this topical report supports Task 1 of the project titled ''Development of Technologies and Capabilities for Coal Energy Resources - Advanced Gasification Systems Development (AGSD)''. The purpose of these tests is to verify that materials planned for use in an advanced gasifier pilot plant will withstand the environments in a commercial gasifier. Pratt & Whitney Rocketdyne (PWR) has developed and designed the cooled liner test assembly article that will be tested at CANMET Energy Technology Centre (CETC-O) in Ottawa, Ontario, Canada (CETC-O). The Test Plan TP-00364 is duplicated in its entirety, with formatting changes to comply with the format required for this Topical Report. The table of contents has been modified to include the additional material required by this topical report. Test Request example and drawings of non-proprietary nature are also included as appendices.

  2. Directives Requiring Additional Documentation - DOE Directives,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Delegations, and Requirements Requiring Additional Documentation by Website Administrator PDF document icon DirectivesRequiringAdditionalDocumentation (1).pdf - PDF document, 35 KB (36219

  3. Johnson Noise Thermometry System Requirements

    SciTech Connect (OSTI)

    Britton Jr, Charles L; Roberts, Michael; Ezell, N Dianne Bull; Qualls, A L; Holcomb, David Eugene

    2013-01-01

    This document is intended to capture the requirements for the architecture of the developmental electronics for the ORNL-lead drift-free Johnson Noise Thermometry (JNT) project conducted under the Instrumentation, Controls, and Human-Machine Interface (ICHMI) research pathway of the U.S. Department of Energy (DOE) Advanced Small Modular Reactor (SMR) Research and Development (R&D) program. The requirements include not only the performance of the system but also the allowable measurement environment of the probe and the allowable physical environment of the associated electronics. A more extensive project background including the project rationale is available in the initial project report [1].

  4. Quality Assurance Requirements and Description

    Energy Savers [EERE]

    QjCivilianRadioactive Was'fe Management QA: QA QVALITY ASSURANCE REQUIREMENTS AND DESCRIPTION DOEIRW-0333P Revisiol1 20 Effective Date: 10-01-2008 LarrY Newman, DlrectQr Office of Quality As,surance ~~--~-_._._- Edward F. Spr at III, Di or Office of Civilian Radioactive Waste Management Date I/Jf/4t' , . - - - Date OCRWM Title: Quality Assurance Requirements and Description DOEIRW-0333P, Revision 20 Office of Civilian Radioactive Waste Management Quality Assurance Policy Page: 2 of 160

  5. Buddy Tag CONOPS and Requirements.

    SciTech Connect (OSTI)

    Brotz, Jay Kristoffer; Deland, Sharon M.

    2015-12-01

    This document defines the concept of operations (CONOPS) and the requirements for the Buddy Tag, which is conceived and designed in collaboration between Sandia National Laboratories and Princeton University under the Department of State Key VerificationAssets Fund. The CONOPS describe how the tags are used to support verification of treaty limitations and is only defined to the extent necessary to support a tag design. The requirements define the necessary functions and desired non-functional features of the Buddy Tag at a high level

  6. Project X functional requirements specification

    SciTech Connect (OSTI)

    Holmes, S.D.; Henderson, S.D.; Kephart, R.; Kerby, J.; Kourbanis, I.; Lebedev, V.; Mishra, S.; Nagaitsev, S.; Solyak, N.; Tschirhart, R.; /Fermilab

    2012-05-01

    Project X is a multi-megawatt proton facility being developed to support a world-leading program in Intensity Frontier physics at Fermilab. The facility is designed to support programs in elementary particle and nuclear physics, with possible applications to nuclear energy research. A Functional Requirements Specification has been developed in order to establish performance criteria for the Project X complex in support of these multiple missions, and to assure that the facility is designed with sufficient upgrade capability to provide U.S. leadership for many decades to come. This paper will briefly review the previously described Functional Requirements, and then discuss their recent evolution.

  7. Flowsheet Testing of the Fission Product Extraction Process as...

    Office of Scientific and Technical Information (OSTI)

    Citation Details In-Document Search Title: Flowsheet Testing of the Fission Product ... generation of spent nuclear fuel requiring geologic disposal is currently being addressed. ...

  8. Rotary mode core sampling service trailer acceptance test report

    SciTech Connect (OSTI)

    Kostelnik, A.J.

    1996-02-12

    This Acceptance Test Report documents compliance with the requirements of specification WHC-S-056. The equipment was tested according to WHC-SD-WM-ATP-111 Rev.1.

  9. CRUSH TESTING OF 9977 GENERAL PURPOSE FISSILE PACKAGINGS

    SciTech Connect (OSTI)

    Smith, A.

    2010-07-28

    The 9977 General Purpose Fissile Package (GPFP) was designed in response to the adoption of the crush test requirement in the US regulations for packages for radioactive materials (10 CFR 71). This presentation on crush testing of the 9977 GPFP Reviews origins of Crush Test Requirements and implementation of crush test requirements in 10 CFR 71. SANDIA testing performed to support the rule making is reviewed. The differences in practice, on the part of the US Department of Energy from those required by the NRC for commercial purposes, are explained. The design features incorporated into the 9977 GPFP to enable it to withstand the crush test and the crush tests performed on the 9977 are described. Lessons learned from crush testing of GPFP packagings are given.

  10. DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site map An overview of the available content on this site. Keep the pointer still over an item for a few seconds to get its description. Directives Delegations Other Requirements Top 10 Directives Help Directives Tools RevCom Redirect for Departmental Element list

  11. A combined cycle engine test facility

    SciTech Connect (OSTI)

    Engers, R.; Cresci, D.; Tsai, C.

    1995-09-01

    Rocket-Based Combined-Cycle (RBCC) engines intended for missiles and/or space launch applications incorporate features of rocket propulsion systems operating in concert with airbreathing engine cycles. Performance evaluation of these types of engines, which are intended to operate from static sea level take-off to supersonic cruise or accerlerate to orbit, requires ground test capabilities which integrate rocket component testing with airbreathing engine testing. A combined cycle engine test facility has been constructed in the General Applied Science Laboratories, Inc. (GASL) Aeropropulsion Test Laboratory to meet this requirement. The facility was designed to support the development of an innovative combined cycle engine concept which features a rocket based ramjet combustor. The test requirements included the ability to conduct tests in which the propulsive force was generated by rocket only, the ramjet only and simultaneous rocket and ramjet power (combined cycle) to evaluate combustor operation over the entire engine cycle. The test facility provides simulation over the flight Mach number range of 0 to 8 and at various trajectories. The capabilities of the combined cycle engine test facility are presented.

  12. UCNI Review Requirement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    UCNI Review Requirement UCNI Review Requirement What are the requirements for reviewing a document that may contain UCNI? 1017.15(a) requires you to have a document that may ...

  13. Massachusetts Large Blade Test Facility Final Report

    SciTech Connect (OSTI)

    Rahul Yarala; Rob Priore

    2011-09-02

    Project Objective: The Massachusetts Clean Energy Center (CEC) will design, construct, and ultimately have responsibility for the operation of the Large Wind Turbine Blade Test Facility, which is an advanced blade testing facility capable of testing wind turbine blades up to at least 90 meters in length on three test stands. Background: Wind turbine blade testing is required to meet international design standards, and is a critical factor in maintaining high levels of reliability and mitigating the technical and financial risk of deploying massproduced wind turbine models. Testing is also needed to identify specific blade design issues that may contribute to reduced wind turbine reliability and performance. Testing is also required to optimize aerodynamics, structural performance, encourage new technologies and materials development making wind even more competitive. The objective of this project is to accelerate the design and construction of a large wind blade testing facility capable of testing blades with minimum queue times at a reasonable cost. This testing facility will encourage and provide the opportunity for the U.S wind industry to conduct more rigorous testing of blades to improve wind turbine reliability.

  14. Surveillance & Maintenance: The Requirements Based Surveillance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Surveillance & Maintenance: The Requirements Based Surveillance and ...

  15. Updated Reporting Requirement Checklists and Research Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reporting Requirement Checklists and Research Performance Progress Report (RPPR) Updated Reporting Requirement Checklists and Research Performance Progress Report (RPPR) Policy ...

  16. HEAT Loan Minimum Standards and Requirements

    Broader source: Energy.gov [DOE]

    Presents additional resources on loan standards and requirements from Elise Avers' presentation on HEAT Loan Minimum Standards and Requirements.

  17. Core fluctuations test. Revision 1

    SciTech Connect (OSTI)

    Betts, W.S.

    1987-06-01

    Fluctuations were first encountered in the Fort St. Vrain reactor early in cycle 1 operation, during the initial rise from 40% to 70% power. Subsequent in-core tests and operation throughout cycles 1 and 2 demonstrated that fluctuations were repeatable, occurring at core pressure drops of between 2.5 psi and 4.0 psi, and that in each instance their characteristics were very similar. Subsequently, tests and analysis were done to understand the core fluctuation phenomenon. These efforts also lead to a design fix which stopped these fluctuations in the FSV reactor core. This fix required that keys be used in addition to the keys in the core support floor which already existed. This report outlines a test plan to validate that core fluctuations will not occur in the MHTGR core. 2 refs., 12 figs., 3 tabs.

  18. Vendor System Vulnerability Testing Test Plan

    SciTech Connect (OSTI)

    James R. Davidson

    2005-01-01

    The Idaho National Laboratory (INL) prepared this generic test plan to provide clients (vendors, end users, program sponsors, etc.) with a sense of the scope and depth of vulnerability testing performed at the INLs Supervisory Control and Data Acquisition (SCADA) Test Bed and to serve as an example of such a plan. Although this test plan specifically addresses vulnerability testing of systems applied to the energy sector (electric/power transmission and distribution and oil and gas systems), it is generic enough to be applied to control systems used in other critical infrastructures such as the transportation sector, water/waste water sector, or hazardous chemical production facilities. The SCADA Test Bed is established at the INL as a testing environment to evaluate the security vulnerabilities of SCADA systems, energy management systems (EMS), and distributed control systems. It now supports multiple programs sponsored by the U.S. Department of Energy, the U.S. Department of Homeland Security, other government agencies, and private sector clients. This particular test plan applies to testing conducted on a SCADA/EMS provided by a vendor. Before performing detailed vulnerability testing of a SCADA/EMS, an as delivered baseline examination of the system is conducted, to establish a starting point for all-subsequent testing. The series of baseline tests document factory delivered defaults, system configuration, and potential configuration changes to aid in the development of a security plan for in depth vulnerability testing. The baseline test document is provided to the System Provider,a who evaluates the baseline report and provides recommendations to the system configuration to enhance the security profile of the baseline system. Vulnerability testing is then conducted at the SCADA Test Bed, which provides an in-depth security analysis of the Vendors system.b a. The term System Provider replaces the name of the company/organization providing the system being evaluated. This can be the system manufacturer, a system user, or a third party organization such as a government agency. b. The term Vendor (or Vendors) System replaces the name of the specific SCADA/EMS being tested.

  19. Major Partner Test Sites

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Major Test Partners Once a technology is ready to be tested at pilot or commercial scale, the cost of building a test facility becomes significant -- often beyond the funding ...

  20. Test | Open Energy Information

    Open Energy Info (EERE)

    Test Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Test Published Publisher Not Provided, Date Not Provided Report Number Test DOI Not Provided Check...

  1. Travel Requirements - ITER (June 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Travel Requirements - ITER (June 2014) Prior to any travel under this subcontract, the Seller shall submit their request to travel with the following information to the Technical Project Officer (TPO) for approval, with a copy to the identified US ITER Project Office Travel Administrative Coordinator (TAC), via email: name of traveler as it appears on passport; e-mail address of traveler; dates of travel; purpose of travel; business city; date business begins; and date business ends. The TAC for

  2. NEV America Test Sequence

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electric Transportation Applications All Rights Reserved NEVAmerica Test Sequence Rev 2 ... Electric Transportation Applications All Rights Reserved NEVAmerica Test Sequence Rev 2 ...

  3. Nevada Test Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in greater detail in the Nevada Test Site Environ- mental Report 2004 (DOENV11718-1080). ... mental programs and efforts Nevada Test Site Environmental Report 2004 Summary ...

  4. HICEV America Test Sequence

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    HICEV America TEST SEQUENCE Revision 0 November 1, 2004 Prepared by Electric ... Donald B. Karner HICEV America Test Sequence Page 1 2004 Electric ...

  5. OMB MPI Tests

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    OMB MPI Tests OMB MPI Tests Description The Ohio MicroBenchmark suite is a collection of independent MPI message passing performance microbenchmarks developed and written at The...

  6. Limited Test Ban Treaty

    National Nuclear Security Administration (NNSA)

    Detection System (USNDS), which monitors compliance with the international Limited Test Ban Treaty (LTBT). The LTBT, signed by 108 countries, prohibits nuclear testing in the...

  7. Long-term corrosion testing pan.

    SciTech Connect (OSTI)

    Wall, Frederick Douglas; Brown, Neil R. (Los Alamos National Laboratory, Los Alamos, NM)

    2008-08-01

    This document describes the testing and facility requirements to support the Yucca Mountain Project long-term corrosion testing needs. The purpose of this document is to describe a corrosion testing program that will (a) reduce model uncertainty and variability, (b) reduce the reliance upon overly conservative assumptions, and (c) improve model defensibility. Test matrices were developed for 17 topical areas (tasks): each matrix corresponds to a specific test activity that is a subset of the total work performed in a task. A future document will identify which of these activities are considered to be performance confirmation activities. Detailed matrices are provided for FY08, FY09 and FY10 and rough order estimates are provided for FY11-17. Criteria for the selection of appropriate test facilities were developed through a meeting of Lead Lab and DOE personnel on October 16-17, 2007. These criteria were applied to the testing activities and recommendations were made for the facility types appropriate to carry out each activity. The facility requirements for each activity were assessed and activities were identified that can not be performed with currently available facilities. Based on this assessment, a total of approximately 10,000 square feet of facility space is recommended to meet all future testing needs, given that all testing is consolidated to a single location. This report is a revision to SAND2007-7027 to address DOE comments and add a series of tests to address NWTRB recommendations.

  8. Pressure Change Measurement Leak Testing Errors

    SciTech Connect (OSTI)

    Pryor, Jeff M; Walker, William C

    2014-01-01

    A pressure change test is a common leak testing method used in construction and Non-Destructive Examination (NDE). The test is known as being a fast, simple, and easy to apply evaluation method. While this method may be fairly quick to conduct and require simple instrumentation, the engineering behind this type of test is more complex than is apparent on the surface. This paper intends to discuss some of the more common errors made during the application of a pressure change test and give the test engineer insight into how to correctly compensate for these factors. The principals discussed here apply to ideal gases such as air or other monoatomic or diatomic gasses; however these same principals can be applied to polyatomic gasses or liquid flow rate with altered formula specific to those types of tests using the same methodology.

  9. Test report for core drilling ignitability testing

    SciTech Connect (OSTI)

    Witwer, K.S.

    1996-08-08

    Testing was carried out with the cooperation of Westinghouse Hanford Company and the United States Bureau of Mines at the Pittsburgh Research Center in Pennsylvania under the Memorandum of Agreement 14- 09-0050-3666. Several core drilling equipment items, specifically those which can come in contact with flammable gasses while drilling into some waste tanks, were tested under conditions similar to actual field sampling conditions. Rotary drilling against steel and rock as well as drop testing of several different pieces of equipment in a flammable gas environment were the specific items addressed. The test items completed either caused no ignition of the gas mixture, or, after having hardware changes or drilling parameters modified, produced no ignition in repeat testing.

  10. Dynamometer Testing (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2010-11-01

    This fact sheet describes the dynamometer and its testing capabilities at the National Wind Technology Center.

  11. National Ignition Facility sub-system design requirements computer system SSDR 1.5.1

    SciTech Connect (OSTI)

    Spann, J.; VanArsdall, P.; Bliss, E.

    1996-09-05

    This System Design Requirement document establishes the performance, design, development and test requirements for the Computer System, WBS 1.5.1 which is part of the NIF Integrated Computer Control System (ICCS). This document responds directly to the requirements detailed in ICCS (WBS 1.5) which is the document directly above.

  12. NREL: Wind Research - Testing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Testing Photo of a large wind turbine blade sticking out of the structural testing laboratory; it is perpendicular to a building at the National Wind Technology Center. A multimegawatt wind turbine blade extends outside of the structural testing facility at the NWTC. PIX #19010 Testing capabilities at the National Wind Technology Center (NWTC) support the installation and testing of wind turbines that range in size from 400 watts to 5.0 megawatts. Engineers provide wind industry manufacturers,

  13. Solderability test system

    DOE Patents [OSTI]

    Yost, F.; Hosking, F.M.; Jellison, J.L.; Short, B.; Giversen, T.; Reed, J.R.

    1998-10-27

    A new test method to quantify capillary flow solderability on a printed wiring board surface finish. The test is based on solder flow from a pad onto narrow strips or lines. A test procedure and video image analysis technique were developed for conducting the test and evaluating the data. Feasibility tests revealed that the wetted distance was sensitive to the ratio of pad radius to line width (l/r), solder volume, and flux predry time. 11 figs.

  14. Solderability test system

    DOE Patents [OSTI]

    Yost, Fred; Hosking, Floyd M.; Jellison, James L.; Short, Bruce; Giversen, Terri; Reed, Jimmy R.

    1998-01-01

    A new test method to quantify capillary flow solderability on a printed wiring board surface finish. The test is based on solder flow from a pad onto narrow strips or lines. A test procedure and video image analysis technique were developed for conducting the test and evaluating the data. Feasibility tests revealed that the wetted distance was sensitive to the ratio of pad radius to line width (l/r), solder volume, and flux predry time.

  15. Major Partner Test Sites

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Major Test Partners Once a technology is ready to be tested at pilot or commercial scale, the cost of building a test facility becomes significant -- often beyond the funding provided for any one project. It then becomes critical to test the technology at a pre-existing facility willing to test experimental technologies. Not surprisingly, most commercial facilities are hesitant to interfere with their operations to experiment, but others, with a view towards the future, welcome promising

  16. AMI FW UPGRADEABILITY TEST PROCEDURE AND SECURITY ASSESSMENT

    SciTech Connect (OSTI)

    Snyder, Isabelle B

    2014-01-01

    The National Institute of Standards and Technology (NIST) is producing NISTIR 7823 to define test requirements for Smart Meter upgradability. The term Smart Meter refers specifically to advanced electric meters being deployed to enhance management of electricity distribution for residential and industrial consumers. The underlying functional and security requirements for Smart Meter upgradability are specified in NEMA standard SG-AMI 1-2009. The purpose of NISTIR 7823 is to describe conformance test requirements that may be used voluntarily by testers and/or test laboratories to determine whether Smart Meters and Upgrade Management Systems conform to the requirements of NEMA SG-AMI 1-2009.

  17. Fuels from microalgae: Technology status, potential, and research requirements

    SciTech Connect (OSTI)

    Neenan, B.; Feinberg, D.; Hill, A.; McIntosh, R.; Terry, K.

    1986-08-01

    Although numerous options for the production of fuels from microalgae have been proposed, our analysis indicates that only two qualify for extensive development - gasoline and ester fuel. In developing the comparisons that support this conclusion, we have identified the major areas of microalgae production and processing that require extensive development. Technology success requires developing and testing processes that fully utilize the polar and nonpolar lipids produced by microalgae. Process designs used in these analyses were derived from fragmented, preliminary laboratory data. These results must be substantiated and integrated processes proposed, tested, and refined to be able to evaluate the commercial feasibility from microalgae. The production of algal feedstocks for processing to gasoline or ester fuel requires algae of high productivity and high lipid content that efficiently utilize saline waters. Species screening and development suggest that algae can achieve required standards taken individually, but algae that can meet the integrated requirements still elude researchers. Effective development of fuels from microalgae technology requires that R and D be directed toward meeting the integrated standards set out in the analysis. As technology analysts, it is inappropriate for us to dictate how the R and D effort should proceed to meet these standards. We end our role by noting that alternative approaches to meeting the feasibility targets have been identified, and it is now the task of program managers and scientists to choose the appropriate approach to assure the greatest likelihood of realizing a commercially viable technology. 70 refs., 39 figs., 35 tabs.

  18. Technical task plan for testing filter box sorbent-paint filter test

    SciTech Connect (OSTI)

    Kilpatrick, L.L.

    1993-09-01

    At the Savannah River Plant, High Level Waste Engineering (HLWE) asked Interim Waste Technology (IWT) to choose and test a sorbent to add to the ITP filter box that meets the EPA requirement for land disposal of containerized liquid hazardous wastes per Paint Filter Liquids (PFL) test method 9095. This report outlines the process to be used in accomplishing this task.

  19. Long-term corrosion testing plan.

    SciTech Connect (OSTI)

    Wall, Frederick Douglas; Brown, Neil R. (Los Alamos National Laboratory, Los Alamos, NM)

    2009-02-01

    This document describes the testing and facility requirements to support the Yucca Mountain Project long-term corrosion testing program. The purpose of this document is to describe a corrosion testing program that will (a) reduce model uncertainty and variability, (b) reduce the reliance upon overly conservative assumptions, and (c) improve model defensibility. Test matrices were developed for 17 topical areas (tasks): each matrix corresponds to a specific test activity that is a subset of the total work performed in a task. A future document will identify which of these activities are considered to be performance confirmation activities. Detailed matrices are provided for FY08, FY09 and FY10 and rough order estimates are provided for FY11-17. Criteria for the selection of appropriate test facilities were developed through a meeting of Lead Lab and DOE personnel on October 16-17, 2007. These criteria were applied to the testing activities and recommendations were made for the facility types appropriate to carry out each activity. The facility requirements for each activity were assessed and activities were identified that can not be performed with currently available facilities. Based on this assessment, a total of approximately 10,000 square feet of facility space is recommended to accommodate all future testing, given that all testing is consolidated to a single location. This report is a revision to SAND2008-4922 to address DOE comments.

  20. Double-shell tank integrity assessments ultrasonic test equipment performance test

    SciTech Connect (OSTI)

    Pfluger, D.C.

    1996-09-26

    A double-shell tank (DST) inspection (DSTI) system was performance tested over three months until August 1995 at Pittsburgh, Pennsylvania, completing a contract initiated in February 1993 to design, fabricate, and test an ultrasonic inspection system intended to provide ultrasonic test (UT) and visual data to determine the integrity of 28 DSTs at Hanford. The DSTs are approximately one-million-gallon underground radioactive-waste storage tanks. The test was performed in accordance with a procedure (Jensen 1995) that included requirements described in the contract specification (Pfluger 1995). This report documents the results of tests conducted to evaluate the performance of the DSTI system against the requirements of the contract specification. The test of the DSTI system also reflects the performance of qualified personnel and operating procedures.

  1. High-Throughput, High-Precision Hot Testing Tool for High-Brightness Light-Emitting Diode Testing

    Broader source: Energy.gov [DOE]

    This project is determining the requirements of the solid-state lighting industry for high-quality color coordination and flux characterization of high-brightness light-emitting diodes (HBLEDs) as well as demonstrating and testing a cost-effective hot test tool that meets the requirements.

  2. DOE-STD-1104 Requirements Crosswalk

    Office of Environmental Management (EM)

    09 to DOE-STD-1104-2014 Requirements Matrix - 1 - No. Section Page Number DOE-STD-1104-2009 Requirement DOE-STD-1104-2014 Requirements Comment Gen DOE-STD-1104-2009 was broadly ...

  3. Sensitivity Test Analysis

    Energy Science and Technology Software Center (OSTI)

    1992-02-20

    SENSIT,MUSIG,COMSEN is a set of three related programs for sensitivity test analysis. SENSIT conducts sensitivity tests. These tests are also known as threshold tests, LD50 tests, gap tests, drop weight tests, etc. SENSIT interactively instructs the experimenter on the proper level at which to stress the next specimen, based on the results of previous responses. MUSIG analyzes the results of a sensitivity test to determine the mean and standard deviation of the underlying population bymore » computing maximum likelihood estimates of these parameters. MUSIG also computes likelihood ratio joint confidence regions and individual confidence intervals. COMSEN compares the results of two sensitivity tests to see if the underlying populations are significantly different. COMSEN provides an unbiased method of distinguishing between statistical variation of the estimates of the parameters of the population and true population difference.« less

  4. TMACS test procedure TP003: Graphics. Revision 6

    SciTech Connect (OSTI)

    Scanlan, P.K.; Washburn, S.

    1994-09-01

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the graphics requirements of the TMACS. The features to be tested are the data display graphics and the graphic elements that provide for operator control and selection of displays.

  5. TMACS test procedure TP001: Alarm management. Revision 6

    SciTech Connect (OSTI)

    Scanlan, P.K.

    1994-09-01

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the Alarm Management requirements of the TMACS. The features to be tested are: real-time alarming on high and low level and discrete alarms, equipment alarms, dead-band filtering, alarm display color coding, alarm acknowledgement, and alarm logging.

  6. TMACS test procedure TP003: Graphics. Revision 5

    SciTech Connect (OSTI)

    Scanlan, P.K.

    1994-08-25

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the graphics requirements of the TMACS. The features to be tested are the data display graphics and the graphic elements that provide for operator control and selection of displays.

  7. Genome informatics: Requirements and challenges

    SciTech Connect (OSTI)

    Robbins, R.J.

    1993-12-31

    Informatics of some kind will play a role in every aspect of the Human Genome Project (HGP); data acquisition, data analysis, data exchange, data publication, and data visualization. What are the real requirements and challenges? The primary requirement is clear thinking and the main challenge is design. If good design is lacking, the price will be failure of genome informatics and ultimately failure of the genome project itself. Scientists need good designs to deliver the tools necessary for acquiring and analyzing DNA sequences. As these tools become more efficient, they will need new tools for comparative genomic analyses. To make the tools work, the scientists will need to address and solve nomenclature issues that are essential, if also tedious. They must devise systems that will scale gracefully with the increasing flow of data. The scientists must be able to move data easily from one system to another, with no loss of content. As scientists, they will have failed in their responsibility to share results, should repeating experiments ever become preferable to searching the literature. Their databases must become a new kind of scientific literature and the scientists must develop ways to make electronic data publishing as routine as traditional journal publishing. Ultimately, they must build systems so advanced that they are virtually invisible. In summary, the HGP can be considered the most ambitious, most audacious information-management project ever undertaken. In the HGP, computers will not merely serve as tools for cataloging existing knowledge. Rather, they will serve as instruments, helping to create new knowledge by changing the way the scientists see the biological world. Computers will allow them to see genomes, just as radio telescopes let them see quasars and electron microscopes let them see viruses.

  8. Government Printing Office Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Government Printing Office Requirements Government Printing Office Requirements This section describes the Government Printing Office (GPO) requirements for all print materials, whether printed electronically or on paper. This includes requirements for printing and copying for all EERE publications. Approved Printers Executive Order 12873, signed by President Clinton, requires that all government offices and their contractors are required to use GPO-approved printers to print and copy all

  9. Network Requirements Workshop - Documents and Background Materials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Review Reports Case Studies News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet Live Home » Science Engagement » Science Requirements Reviews » Network Requirements Reviews » Documents and Background Materials Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR

  10. Defect Prevention and Detection in Software for Automated Test Equipment

    SciTech Connect (OSTI)

    E. Bean

    2006-11-30

    Software for automated test equipment can be tedious and monotonous making it just as error-prone as other software. Active defect prevention and detection are also important for test applications. Incomplete or unclear requirements, a cryptic syntax used for some test applicationsespecially script-based test sets, variability in syntax or structure, and changing requirements are among the problems encountered in one tester. Such problems are common to all software but can be particularly problematic in test equipment software intended to test another product. Each of these issues increases the probability of error injection during test application development. This report describes a test application development tool designed to address these issues and others for a particular piece of test equipment. By addressing these problems in the development environment, the tool has powerful built-in defect prevention and detection capabilities. Regular expressions are widely used in the development tool as a means of formally defining test equipment requirements for the test application and verifying conformance to those requirements. A novel means of using regular expressions to perform range checking was developed. A reduction in rework and increased productivity are the results. These capabilities are described along with lessons learned and their applicability to other test equipment software. The test application development tool, or application builder, is known as the PT3800 AM Creation, Revision and Archiving Tool (PACRAT).

  11. Quality Work Plan Communications Requirement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The plan includes a communication requirement that all WAP Grantees must meet. In this ... state Grantees must meet a communication requirement to ensure that the Grantee ...

  12. Requirements Based Surveillance and Maintenance Review Process...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Based Surveillance and Maintenance Review Process Interview Form Requirements Based Surveillance and Maintenance Review Process Interview Form PDF icon Requirements Based ...

  13. Cooperating Agencies in Implementing the Procedural Requirements...

    Energy Savers [EERE]

    Agencies in Implementing the Procedural Requirements of the National Environmental Policy Act Cooperating Agencies in Implementing the Procedural Requirements of the National...

  14. Studying the Communications Requirements of Electric Utilities...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policies- Public Meeting Studying the Communications Requirements of Electric Utilities ...

  15. Requirements for Bridge Inspection | Department of Energy

    Office of Environmental Management (EM)

    Requirements for Bridge Inspection Requirements for Bridge Inspection More Documents & Publications Microsoft PowerPoint - 2009.10.27 Bridge Inspection Follow-up Slide 1 National...

  16. California Waste Discharge Requirements Website | Open Energy...

    Open Energy Info (EERE)

    Requirements Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: California Waste Discharge Requirements Website Abstract This website contains...

  17. Facility Safety - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0.1C Chg 1, Facility Safety by Pranab Guha Functional areas: DNFSB, Defense Nuclear Facility Safety and Health Requirement, Facility Safety, Requires Crosswalk When Revised,...

  18. test.eps

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    test and evaluation NNSA, Air Force Complete Successful B61-12 Life Extension Program Development Flight Test at Tonopah Test Range WASHINGTON - The National Nuclear Security Administration (NNSA) and United States Air Force completed the third development flight test of a non-nuclear B61-12 nuclear gravity bomb at Tonopah Test Range in Nevada on October 20, 2015. "This demonstration of effective end-to-end system... Flight Test of Weapons System Body by Navy Successful Third Flight

  19. CERTS Microgrid Laboratory Test Bed

    SciTech Connect (OSTI)

    Eto, Joe; Lasseter, Robert; Schenkman, Ben; Stevens, John; Klapp, Dave; Volkommer, Harry; Linton, Ed; Hurtado, Hector; Roy, Jean

    2009-06-18

    The objective of the CERTS Microgrid Test Bed project was to enhance the ease of integrating energy sources into a microgrid. The project accomplished this objective by developing and demonstrating three advanced techniques, collectively referred to as the CERTS Microgrid concept, that significantly reduce the level of custom field engineering needed to operate microgrids consisting of generating sources less than 100kW. The techniques comprising the CERTS Microgrid concept are: 1) a method for effecting automatic and seamless transitions between grid-connected and islanded modes of operation, islanding the microgrid's load from a disturbance, thereby maintaining a higher level of service, without impacting the integrity of the utility's electrical power grid; 2) an approach to electrical protection within a limited source microgrid that does not depend on high fault currents; and 3) a method for microgrid control that achieves voltage and frequency stability under islanded conditions without requiring high-speed communications between sources. These techniques were demonstrated at a full-scale test bed built near Columbus, Ohio and operated by American Electric Power. The testing fully confirmed earlier research that had been conducted initially through analytical simulations, then through laboratory emulations,and finally through factory acceptance testing of individual microgrid components. The islanding and resychronization method met all Institute of Electrical and Electronics Engineers Standard 1547 and power quality requirements. The electrical protection system was able to distinguish between normal and faulted operation. The controls were found to be robust under all conditions, including difficult motor starts and high impedance faults. The results from these tests are expected to lead to additional testing of enhancements to the basic techniques at the test bed to improve the business case for microgrid technologies, as well to field demonstrations involving microgrids that involve one or more of the CERTS Microgrid concepts. Future planned microgrid work involves unattended continuous operation of the microgrid for 30 to 60 days to determine how utility faults impact the operation of the microgrid and to gage the power quality and reliability improvements offered by microgrids.

  20. Coated Fiber Neutron Detector Test

    SciTech Connect (OSTI)

    Lintereur, Azaree T.; Ely, James H.; Kouzes, Richard T.; Stromswold, David C.

    2009-10-23

    Radiation portal monitors used for interdiction of illicit materials at borders include highly sensitive neutron detection systems. The main reason for having neutron detection capability is to detect fission neutrons from plutonium. The currently deployed radiation portal monitors (RPMs) from Ludlum and Science Applications International Corporation (SAIC) use neutron detectors based upon 3He-filled gas proportional counters, which are the most common large neutron detector. There is a declining supply of 3He in the world, and thus, methods to reduce the use of this gas in RPMs with minimal changes to the current system designs and sensitivity to cargo-borne neutrons are being investigated. Reported here are the results of tests of the 6Li/ZnS(Ag)-coated non-scintillating plastic fibers option. This testing measured the required performance for neutron detection efficiency and gamma ray rejection capabilities of a system manufactured by Innovative American Technology (IAT).

  1. NEVADA TEST SITE WASTE ACCEPTANCE CRITERIA

    SciTech Connect (OSTI)

    U.S. DEPARTMENT OF ENERGY, NATIONAL NUCLEAR SECURITY ADMINISTRATION, NEVADA SITE OFFICE

    2005-07-01

    This document establishes the U. S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive and mixed waste for disposal. Mixed waste generated within the State of Nevada by NNSA/NSO activities is accepted for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the Nevada Test Site Area 3 and Area 5 Radioactive Waste Management Site for storage or disposal.

  2. Lessons learned during Type A Packaging testing

    SciTech Connect (OSTI)

    O`Brien, J.H.; Kelly, D.L.

    1995-11-01

    For the past 6 years, the US Department of Energy (DOE) Office of Facility Safety Analysis (EH-32) has contracted Westinghouse Hanford Company (WHC) to conduct compliance testing on DOE Type A packagings. The packagings are tested for compliance with the U.S. Department of Transportation (DOT) Specification 7A, general packaging, Type A requirements. The DOE has shared the Type A packaging information throughout the nuclear materials transportation community. During testing, there have been recurring areas of packaging design that resulted in testing delays and/or initial failure. The lessons learned during the testing are considered a valuable resource. DOE requested that WHC share this resource. By sharing what is and can be encountered during packaging testing, individuals will hopefully avoid past mistakes.

  3. Neutron Sources for Standard-Based Testing

    SciTech Connect (OSTI)

    Radev, Radoslav; McLean, Thomas

    2014-11-10

    The DHS TC Standards and the consensus ANSI Standards use 252Cf as the neutron source for performance testing because its energy spectrum is similar to the 235U and 239Pu fission sources used in nuclear weapons. An emission rate of 20,000 ± 20% neutrons per second is used for testing of the radiological requirements both in the ANSI standards and the TCS. Determination of the accurate neutron emission rate of the test source is important for maintaining consistency and agreement between testing results obtained at different testing facilities. Several characteristics in the manufacture and the decay of the source need to be understood and accounted for in order to make an accurate measurement of the performance of the neutron detection instrument. Additionally, neutron response characteristics of the particular instrument need to be known and taken into account as well as neutron scattering in the testing environment.

  4. HMPT: Hazardous Waste Transportation Live 27928, Test 27929 (Technical

    Office of Scientific and Technical Information (OSTI)

    Report) | SciTech Connect HMPT: Hazardous Waste Transportation Live 27928, Test 27929 Citation Details In-Document Search Title: HMPT: Hazardous Waste Transportation Live 27928, Test 27929 HMPT: Hazardous Waste Transportation (Live 27928, suggested one time and associated Test 27929, required initially and every 36 months) addresses the Department of Transportation (DOT) function-specific training requirements of the hazardous materials packagings and transportation (HMPT) Los Alamos

  5. Massive Hanford Test Reactor Removed - Plutonium Recycle Test...

    Office of Environmental Management (EM)

    Massive Hanford Test Reactor Removed - Plutonium Recycle Test Reactor removed from Hanford's 300 Area Massive Hanford Test Reactor Removed - Plutonium Recycle Test Reactor removed ...

  6. Radiation Safety Test

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Safety Test. This form can also be picked up and filled out in the CAMD front office, rm. 107 A minimum passing score is 80% (24 out of 30) After completing the test, you will ...

  7. High Explosives Testing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    August 1, 2013 The design and testing for "Little Boy" took place at Gun Site The design and testing for "Little Boy" took place at Gun Site. RELATED IMAGES http:...

  8. Postirradiation Testing Laboratory (327 Building)

    SciTech Connect (OSTI)

    Kammenzind, D.E.

    1997-05-28

    A Standards/Requirements Identification Document (S/RID) is the total list of the Environment, Safety and Health (ES and H) requirements to be implemented by a site, facility, or activity. These requirements are appropriate to the life cycle phase to achieve an adequate level of protection for worker and public health and safety, and the environment during design, construction, operation, decontamination and decommissioning, and environmental restoration. S/RlDs are living documents, to be revised appropriately based on change in the site`s or facility`s mission or configuration, a change in the facility`s life cycle phase, or a change to the applicable standards/requirements. S/RIDs encompass health and safety, environmental, and safety related safeguards and security (S and S) standards/requirements related to the functional areas listed in the US Department of Energy (DOE) Environment, Safety and Health Configuration Guide. The Fluor Daniel Hanford (FDH) Contract S/RID contains standards/requirements, applicable to FDH and FDH subcontractors, necessary for safe operation of Project Hanford Management Contract (PHMC) facilities, that are not the direct responsibility of the facility manager (e.g., a site-wide fire department). Facility S/RIDs contain standards/requirements applicable to a specific facility that are the direct responsibility of the facility manager. S/RlDs are prepared by those responsible for managing the operation of facilities or the conduct of activities that present a potential threat to the health and safety of workers, public, or the environment, including: Hazard Category 1 and 2 nuclear facilities and activities, as defined in DOE 5480.23. Selected Hazard Category 3 nuclear, and Low Hazard non-nuclear facilities and activities, as agreed upon by RL. The Postirradiation Testing Laboratory (PTL) S/RID contains standards/ requirements that are necessary for safe operation of the PTL facility, and other building/areas that are the direct responsibility of the specific facility manager. The specific DOE Orders, regulations, industry codes/standards, guidance documents and good industry practices that serve as the basis for each element/subelement are identified and aligned with each subelement.

  9. Stack Characterization System Development and Testing (Conference) |

    Office of Scientific and Technical Information (OSTI)

    SciTech Connect Conference: Stack Characterization System Development and Testing Citation Details In-Document Search Title: Stack Characterization System Development and Testing Oak Ridge National Laboratory, as well as the rest of the U.S. Department of Energy community, has numerous off-gas stacks that need to be decommissioned, demolished, and packaged for disposal. Disposal requires a waste disposition determination phase. Process knowledge typically makes a worst-case scenario decision

  10. Blade Testing Trends (Presentation)

    SciTech Connect (OSTI)

    Desmond, M.

    2014-08-01

    As an invited guest speaker, Michael Desmond presented on NREL's NWTC structural testing methods and capabilities at the 2014 Sandia Blade Workshop held on August 26-28, 2014 in Albuquerque, NM. Although dynamometer and field testing capabilities were mentioned, the presentation focused primarily on wind turbine blade testing, including descriptions and capabilities for accredited certification testing, historical methodology and technology deployment, and current research and development activities.

  11. OMB MPI Tests

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    OMB MPI Tests OMB MPI Tests Description The Ohio MicroBenchmark suite is a collection of independent MPI message passing performance microbenchmarks developed and written at The Ohio State University. It includes traditional benchmarks and performance measures such as latency, bandwidth and host overhead and can be used for both traditional and GPU-enhanced nodes. For the purposes of the Trinity / NERSC-8 acquisition this includes only the following tests: (name of OSU test: performance

  12. NCCS Regression Test Harness

    Energy Science and Technology Software Center (OSTI)

    2015-09-09

    The NCCS Regression Test Harness is a software package that provides a framework to perform regression and acceptance testing on NCCS High Performance Computers. The package is written in Python and has only the dependency of a Subversion repository to store the regression tests.

  13. Quality Work Plan Inspection and Monitoring Requirement

    Broader source: Energy.gov [DOE]

    Inspection and monitoring requirements for Weatherization Assistance Program's comprehensive Quality Work Plan.

  14. Grantee Checklist for the Inspection & Monitoring Requirement

    Broader source: Energy.gov [DOE]

    This document walks Grantees through the Inspection and Monitoring requirement of the Quality Work Plan.

  15. Trusted materials using orthogonal testing. 2015 Annual report

    SciTech Connect (OSTI)

    Van Benthem, Mark

    2015-09-01

    The purpose of this project is to prove (or disprove) that a reasonable number of simple tests can be used to provide a unique data signature for materials, changes in which could serve as a harbinger of material deviation, prompting further evaluations. The routine tests are mutually orthogonal to any currently required materials specification tests.

  16. Drum drop test report

    SciTech Connect (OSTI)

    McBeath, R.S.

    1995-02-28

    Testing was performed to determine actual damage to drums when dropped from higher than currently stacked elevations. The drum configurations were the same as they are placed in storage; single drums and four drums banded to a pallet. Maximum drop weights were selected based on successful preliminary tests. Material was lost from each of the single drum tests while only a small amount of material was lost from one of the pelletized drums. The test results are presented in this report. This report also provides recommendations for further testing to determine the appropriate drum weight which can be stored on a fourth tier.

  17. Online PM Measurement for In-Use Testing | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    A September 2014 interview with Douglas K Woods, the President of the Association for Manufacturing Technology, on the state of US manufacturing. PDF icon One on One - Douglas K Woods More Documents & Publications Printing a Car: A Team Effort in Innovation Printing a Car: A Team Effort in Innovation Advanced Microturbine System: Market Assessment, May 2003 Green Leasing Deployment Portfolio - 2014 BTO Peer Review

    Modern diesel aerosol and its measurement and correlation to laboratory

  18. Documentation and verification required for type A packaging use

    SciTech Connect (OSTI)

    O`Brien, J.H.

    1997-07-30

    This document furnishes knowledge and methods for verifying compliance with the U.S. Department of Transportation (DOT) packaging requirements for shipping Type A quantities of radioactive material. The primary emphasis is on the requirements identified in 49 CFR 173.415(a), which states, ``Each offeror of a Specification 7A package must maintain on file for at least one year after the shipment, and shall provide to DOT on request, complete documentation of tests and an engineering evaluation of comparative data showing that the construction methods, packaging design, and materials of construction comply with that specification.`` This guidance document uses a checklist to show compliance.

  19. Civilian Radioactive Waste Management System Requirements Document |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Civilian Radioactive Waste Management System Requirements Document Civilian Radioactive Waste Management System Requirements Document This document specifies the top-level requirements for the Civilian Radioactive Waste Management System (CRWMS). The document is referred to herein as the CRD, for CRWMS Requirements Document. PDF icon Civilian Radioactive Waste Management System Requirements Document More Documents & Publications FY 2007 Total System Life Cycle Cost,

  20. Stability testing of low-level waste forms

    SciTech Connect (OSTI)

    Piciulo, P.L.; Shea, C.E.; Barletta, R.E.

    1983-01-01

    The NRC Technical Position on Waste Form identifies methods for thermal cycle testing and biodegradation testing of low-level waste forms. These tests were carried out on low-level waste forms to establish whether the tests are reasonable and can be achieved. The thermal-cycle test is believed adequate for demonstrating the thermal stability of solidified waste forms. The biodegradation tests are sufficient for distinguishing materials that are susceptible to biodegradation. However, failure of either of these tests should not be regarded of itself as an indication that the waste form will biodegrade to an extent that the form does not meet the stability requirements of 10 CFR Part 61.

  1. Sample Proficiency Test exercise

    SciTech Connect (OSTI)

    Alcaraz, A; Gregg, H; Koester, C

    2006-02-05

    The current format of the OPCW proficiency tests has multiple sets of 2 samples sent to an analysis laboratory. In each sample set, one is identified as a sample, the other as a blank. This method of conducting proficiency tests differs from how an OPCW designated laboratory would receive authentic samples (a set of three containers, each not identified, consisting of the authentic sample, a control sample, and a blank sample). This exercise was designed to test the reporting if the proficiency tests were to be conducted. As such, this is not an official OPCW proficiency test, and the attached report is one method by which LLNL might report their analyses under a more realistic testing scheme. Therefore, the title on the report ''Report of the Umpteenth Official OPCW Proficiency Test'' is meaningless, and provides a bit of whimsy for the analyses and readers of the report.

  2. Test Acquisition Guide

    Broader source: Energy.gov [DOE]

    Regulatory requirements for the acquisition process are set forth in the Federal Acquisition Regulation (FAR) and are supplemented in the Department of Energy Acquisition Regulation (DEAR). FAR 1...

  3. Final Report - LAW Envelope A and B Glass Formulations Testing in Increase Waste Loading. VSL-06R6900-1

    SciTech Connect (OSTI)

    Kruger, Albert A.; Joseph, I.; Muller, I. S.; Gong, W.; Gan, H.; Pegg, I. L.; Matlack, K. S.

    2013-12-03

    This report describes the results of testing specified by the Test Plan VSL-06R6900-1 Rev 0. The work was performed in compliance with quality assurance requirements specified in the Test Plan. Results required by the Test Plan are reported. The test results and this report have been reviewed for correctness, technical adequacy, completeness, and accuracy.

  4. Final Report - LAW Envelope C Glass Formulation Testing to Increase Waste Loading, VSL-05R5900-1

    SciTech Connect (OSTI)

    Kruger, Albert A.; Pegg, I. L.; Matlack, K. S.; Joseph, I.; Muller, I. S.; Gong, W.

    2013-12-03

    This report describes the results of testing specified by Test Plan VSL-05R5900-1 Rev.0. The work was performed in compliance with the quality assurance requirements specified in the Test Plan. Results required by the Test Plan are reported. The test results and this report have been reviewed for correctness, technical adequacy, completeness, and accuracy.

  5. SHINE Vacuum Pump Test Verification

    SciTech Connect (OSTI)

    Morgan, Gregg A; Peters, Brent

    2013-09-30

    Normetex pumps used world-wide for tritium service are no longer available. DOE and other researchers worldwide have spent significant funds characterizing this pump. Identification of alternate pumps is required for performance and compatibility with tritium gas. Many of the pumps that could be used to meet the functional performance requirements (e.g. pressure and flow conditions) of the Normetex pump have features that include the use of polymers or oils and greases that are not directly compatible with tritium service. This study assembles a test system to determine the flow characteristics for candidate alternate pumps. These tests are critical to the movement of tritium through the SHINE Tritium Purification System (TPS). The purpose of the pump testing is two-fold: (1) obtain baseline vacuum pump characteristics for an alternate (i.e. ''Normetex replacement'') pump intended for use in tritium service; and (2) verify that low pressure hydrogen gas can be transported over distances up to 300 feet by the candidate pumps. Flow rates and nominal system pressures have been identified for the SHINE Mo-99 production process Tritium Purification System (TPS). To minimize the line sizes for the transfer of low pressure tritium from the Neutron Driver Accelerator System (NDAS) to the primary processing systems in the TPS, a ''booster'' pump has been located near the accelerator in the design. A series of pump tests were performed at various configurations using hydrogen gas (no tritium) to ensure that this concept is practical and maintains adequate flow rates and required pressures. This report summarizes the results of the tests that have been performed using various pump configurations. The current design of the Tritium Purification System requires the ''booster'' pump to discharge to or to be backed by another vacuum pump. Since Normetex pumps are no longer manufactured, a commercially available Edwards scroll pump will be used to back the booster pump. In this case the ''booster pump'' is an Adixen Molecular Drag Pump (MDP 5011) and the backing pump is an Edwards (nXDS15iC) scroll pump. Various configurations of the two pumps and associated lengths of 3/4 inch tubing (0 feet to 300 feet) were used in combination with hydrogen and nitrogen flow rates ranging from 25-400 standard cubic centimeters per minute (sccm) to determine whether the proposed pump configuration meets the design criteria for SHINE. The results of this study indicate that even under the most severe conditions (300 feet of tubing and 400 sccm flow rate) the Adixen 5011 MDP can serve as a booster pump to transport gases from the accelerator (NDAS) to the TPS. The Target Gas Receiving System pump (Edwards nXDS15iC) located approximately 300 feet from the accelerator can effectively back the Adixen MDP. The molecular drag pump was able to maintain its full rotational speed even when the flow rate was 400 sccm hydrogen or nitrogen and 300 feet of tubing was installed between the drag pump and the Edwards scroll pump. In addition to maintaining adequate rotation, the pressure in the system was maintained below the target pressure of 30 torr for all flow rates, lengths of tubing, and process gases. This configuration is therefore adequate to meet the SHINE design requirements in terms of flow and pressure.

  6. Screening tests report. Volume I

    SciTech Connect (OSTI)

    Not Available

    1984-07-01

    A Pressurized Fluidized Bed Combustion (PFBC) Experimental Facility has been established by UK, US and FRG Sponsors under the auspices of the International Energy Agency at Grimethorpe, South Yorkshire, England. The objective is to study combustion, sulfur removal, heat transfer, emissions, gas clean-up, corrosion and energy recovery in PFBC systems. The facility has undergone a number of modifications as a result of experience gained in a program of experimental operation with a UK datum coal and sorbent. Before making further planned modifications, and embarking on a program of experimental operation with US and FRG coal/sorbent combinations, a short series of tests was performed to establish the basic combustion parameters and to forewarn the project of any operational problem related to particular coal/sorbent combinations. This series of tests, the Screening Tests, is described in the present report. Bed material agglomerated during some of the Screening Test runs, and the operating conditions were altered from those originally planned in an attempt to minimize the occurrence. It is now believed that agglomeration resulted from changes that had been made to combustor design details and start-up procedures in an attempt to alleviate tube bank metal wastage. These factors have been subsequently corrected. The data obtained over the revized range of operating conditions included those relating to combustion and sulfur retention performance, in-bed tube bank metal wastage, gaseous and particulate emissions and the behavior of static turbine blades in a cascade. The information provided, in advance of the comprehensive series of tests with the US and FRG coal/sorbent combinations, the preliminary characterization required.

  7. Advanced Technology Vehicle Testing

    SciTech Connect (OSTI)

    James Francfort

    2004-06-01

    The goal of the U.S. Department of Energy's Advanced Vehicle Testing Activity (AVTA) is to increase the body of knowledge as well as the awareness and acceptance of electric drive and other advanced technology vehicles (ATV). The AVTA accomplishes this goal by testing ATVs on test tracks and dynamometers (Baseline Performance testing), as well as in real-world applications (Fleet and Accelerated Reliability testing and public demonstrations). This enables the AVTA to provide Federal and private fleet managers, as well as other potential ATV users, with accurate and unbiased information on vehicle performance and infrastructure needs so they can make informed decisions about acquiring and operating ATVs. The ATVs currently in testing include vehicles that burn gaseous hydrogen (H2) fuel and hydrogen/CNG (H/CNG) blended fuels in internal combustion engines (ICE), and hybrid electric (HEV), urban electric, and neighborhood electric vehicles. The AVTA is part of DOE's FreedomCAR and Vehicle Technologies Program.

  8. Lead Coolant Test Facility Development Workshop

    SciTech Connect (OSTI)

    Paul A. Demkowicz

    2005-06-01

    A workshop was held at the Idaho National Laboratory on May 25, 2005, to discuss the development of a next generation lead or lead-alloy coolant test facility. Attendees included representatives from the Generation IV lead-cooled fast reactor (LFR) program, Advanced Fuel Cycle Initiative, and several universities. Several participants gave presentations on coolant technology, existing experimental facilities for lead and lead-alloy research, the current LFR design concept, and a design by Argonne National Laboratory for an integral heavy liquid metal test facility. Discussions were focused on the critical research and development requirements for deployment of an LFR demonstration test reactor, the experimental scope of the proposed coolant test facility, a review of the Argonne National Laboratory test facility design, and a brief assessment of the necessary path forward and schedule for the initial stages of this development project. This report provides a summary of the presentations and roundtable discussions.

  9. DOE-STD-1104 Requirements Crosswalk

    Office of Environmental Management (EM)

    09 to DOE-STD-1104-2014 Requirements Matrix - 1 - No. Section/ Page Number DOE-STD-1104-2009 Requirement DOE-STD-1104-2014 Requirements Comment Gen DOE-STD-1104-2009 was broadly implemented but not required. DOE-STD-1104-2014 will be required by DOE Order 420.1C, Page Change 1, soon to be approved (already concurred upon by the program offices and the Directives Review Board). DOE-STD-1104- 2014will now be a required method. For more discussion, see letter from Moniz to Winokur, October 18,

  10. CERTS Microgrid Laboratory Test Bed

    SciTech Connect (OSTI)

    Lasseter, R. H.; Eto, J. H.; Schenkman, B.; Stevens, J.; Volkmmer, H.; Klapp, D.; Linton, E.; Hurtado, H.; Roy, J.

    2010-06-08

    CERTS Microgrid concept captures the emerging potential of distributed generation using a system approach. CERTS views generation and associated loads as a subsystem or a 'microgrid'. The sources can operate in parallel to the grid or can operate in island, providing UPS services. The system can disconnect from the utility during large events (i.e. faults, voltage collapses), but may also intentionally disconnect when the quality of power from the grid falls below certain standards. CERTS Microgrid concepts were demonstrated at a full-scale test bed built near Columbus, Ohio and operated by American Electric Power. The testing fully confirmed earlier research that had been conducted initially through analytical simulations, then through laboratory emulations, and finally through factory acceptance testing of individual microgrid components. The islanding and resynchronization method met all Institute of Electrical and Electronics Engineers Standard 1547 and power quality requirements. The electrical protection system was able to distinguish between normal and faulted operation. The controls were found to be robust under all conditions, including difficult motor starts and high impedance faults.

  11. Testing of the structural evaluation test unit

    SciTech Connect (OSTI)

    Ammerman, D.J.; Bobbe, J.G.

    1995-12-31

    In the evaluation of the safety of radioactive material transportation it is important to consider the response of Type B packages to environments more severe than that prescribed by the hypothetical accident sequence in Title 10 Part 71 of the Code of Federal Regulations (NRC 1995). The impact event in this sequence is a 9-meter drop onto an essentially unyielding target, resulting in an impact velocity of 13.4 m/s. The behavior of 9 packages when subjected to impacts more severe than this is not well known. It is the purpose of this program to evaluate the structural response of a test package to these environments. Several types of structural response are considered. Of primary importance is the behavior of the package containment boundary, including the bolted closure and 0-rings. Other areas of concern are loss of shielding capability due to lead slump and the deceleration loading of package contents, that may cause damage to them. This type of information is essential for conducting accurate risk assessments on the transportation of radioactive materials. Currently very conservative estimates of the loss of package protection are used in these assessments. This paper will summarize the results of a regulatory impact test and three extra-regulatory impact tests on a sample package.

  12. Leak test fitting

    DOE Patents [OSTI]

    Pickett, P.T.

    A hollow fitting for use in gas spectrometry leak testing of conduit joints is divided into two generally symmetrical halves along the axis of the conduit. A clip may quickly and easily fasten and unfasten the halves around the conduit joint under test. Each end of the fitting is sealable with a yieldable material, such as a piece of foam rubber. An orifice is provided in a wall of the fitting for the insertion or detection of helium during testing. One half of the fitting also may be employed to test joints mounted against a surface.

  13. Leak test fitting

    DOE Patents [OSTI]

    Pickett, Patrick T.

    1981-01-01

    A hollow fitting for use in gas spectrometry leak testing of conduit joints is divided into two generally symmetrical halves along the axis of the conduit. A clip may quickly and easily fasten and unfasten the halves around the conduit joint under test. Each end of the fitting is sealable with a yieldable material, such as a piece of foam rubber. An orifice is provided in a wall of the fitting for the insertion or detection of helium during testing. One half of the fitting also may be employed to test joints mounted against a surface.

  14. wave energy testing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel ... SubTER Carbon Sequestration Program Leadership EnergyWater Nexus EnergyWater History ...

  15. Central Receiver Test Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel ... SubTER Carbon Sequestration Program Leadership EnergyWater Nexus EnergyWater History ...

  16. Sensitivity testing and analysis

    SciTech Connect (OSTI)

    Neyer, B.T.

    1991-01-01

    New methods of sensitivity testing and analysis are proposed. The new test method utilizes Maximum Likelihood Estimates to pick the next test level in order to maximize knowledge of both the mean, {mu}, and the standard deviation, {sigma} of the population. Simulation results demonstrate that this new test provides better estimators (less bias and smaller variance) of both {mu} and {sigma} than the other commonly used tests (Probit, Bruceton, Robbins-Monro, Langlie). A new method of analyzing sensitivity tests is also proposed. It uses the Likelihood Ratio Test to compute regions of arbitrary confidence. It can calculate confidence regions, for {mu}, {sigma}, and arbitrary percentiles. Unlike presently used methods, such as the program ASENT which is based on the Cramer-Rao theorem, it can analyze the results of all sensitivity tests, and it does not significantly underestimate the size of the confidence regions. The new test and analysis methods will be explained and compared to the presently used methods. 19 refs., 12 figs.

  17. Performance testing accountability measurements

    SciTech Connect (OSTI)

    Oldham, R.D.; Mitchell, W.G.; Spaletto, M.I.

    1993-12-31

    The New Brunswick Laboratory (NBL) provides assessment support to the DOE Operations Offices in the area of Material Control and Accountability (MC and A). During surveys of facilities, the Operations Offices have begun to request from NBL either assistance in providing materials for performance testing of accountability measurements or both materials and personnel to do performance testing. To meet these needs, NBL has developed measurement and measurement control performance test procedures and materials. The present NBL repertoire of performance tests include the following: (1) mass measurement performance testing procedures using calibrated and traceable test weights, (2) uranium elemental concentration (assay) measurement performance tests which use ampulated solutions of normal uranyl nitrate containing approximately 7 milligrams of uranium per gram of solution, and (3) uranium isotopic measurement performance tests which use ampulated uranyl nitrate solutions with enrichments ranging from 4% to 90% U-235. The preparation, characterization, and packaging of the uranium isotopic and assay performance test materials were done in cooperation with the NBL Safeguards Measurements Evaluation Program since these materials can be used for both purposes.

  18. Lighting Test Facilities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lighting-Test-Facilities Sign In About | Careers | Contact | Investors | bpa.gov Search Policy & Reporting Expand Policy & Reporting EE Sectors Expand EE Sectors Technology &...

  19. test and evaluation

    National Nuclear Security Administration (NNSA)

    5%2A en Office of Test and Evaluation http:nnsa.energy.govaboutusourprogramsdefenseprogramsstockpilestewardshiptestcapabilitiesand-eval

  20. Nanoparticle toxicity testing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    submit Nanoparticle toxicity testing Assessing the potential health hazards of nanotechnology March 25, 2013 Robot In the search for more accurate and efficient techniques to...

  1. Electrostatic Discharge testing of propellants and primers

    SciTech Connect (OSTI)

    Berry, R.B.

    1994-02-01

    This report presents the results of testing of selected propellants and primers to Electrostatic Discharge (ESD) characteristic of the human body. It describes the tests and the fixturing built to accommodate loose material (propellants) and the packed energetic material of the primer. The results indicate that all powders passed and some primers, especially the electric primers, failed to pass established requirements which delineate insensitive energetic components. This report details the testing of components and materials to four ESD environments (Standard ESD, Severe ESD, Modified Standard ESD, and Modified Severe ESD). The purpose of this study was to collect data based on the customer requirements as defined in the Sandia Environmental Safety & Health (ES&H) Manual, Chapter 9, and to define static sensitive and insensitive propellants and primers.

  2. 118-B-1 excavation treatability test plan

    SciTech Connect (OSTI)

    Not Available

    1994-07-01

    The Hanford 118-B-1 Burial Ground Treatability Study has been required by milestone change request {number_sign}M-15-93-04, dated September 30, 1993. The change request requires that a treatability test be conducted at the 100-B Area to obtain additional engineering information for remedial design of burial grounds receiving waste from 100 Area removal actions. This treatability study has two purposes: (1) to support development of the Proposed Plan (PP) and Record of Decision (ROD), which will identify the approach to be used for burial ground remediation, and (2) to provide specific engineering information for receiving waste generated from the 100 Area removal actions. Data generated from this test also will provide critical performance and cost information necessary for remedy evaluation in the detailed analysis of alternatives during preparation of the focused feasibility study (FFS). This treatability testing supports the following 100 Area alternatives: (1) excavation and disposal, and (2) excavation, sorting, (treatment), and disposal.

  3. Independent Safety Evaluation of the MFF-2 test (HK192)

    SciTech Connect (OSTI)

    Van Keuren, J.C.

    1988-06-01

    This document gives the results of the Independent Safety Evaluation (ISE) of the MFF-2 fuel assembly in accordance with the requirements of EI-501. Information on the test design has been taken from the test documents, but independent calculations of the safety related parameters of the test have been made. This report considers seven basic areas: Technical Specification Considerations, Steady State Operation, Transient Operation, HCDA Considerations, Failure Analyses, Stress and Seismic, Criticality and Test Handling Considerations. 25 refs., 1 fig., 5 tabs.

  4. Quality Assurance Program Application for the Component Test Capability

    SciTech Connect (OSTI)

    Stephanin L. Austad

    2009-06-01

    This paper documents the application of quality requirements to Component Test Capability (CTC) Project activities for each CTC alternative. Four alternatives are considered for quality program application: do nothing, vendor testing, existing testing facility modification, and Component Test Facility. It also describes the advantages and disadvantages of using the existing Next Generation Nuclear Plant Quality Program Plan with CTC modifications versus a stand-alone CTC Quality Program Plan.

  5. Field Testing: Independent, Accredited Testing and Validation for the Wind Industry (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2011-11-01

    This fact sheet describes the field testing capabilities at the National Wind Technology Center (NWTC). NREL's specialized facilities and personnel at the NWTC provide the U.S. wind industry with scientific and engineering support that has proven critical to the development of wind energy for U.S. energy needs. The NWTC's specialized field-testing capabilities have evolved over 30 years of continuous support by the U.S. Department of Energy Wind and Hydropower Technologies Program and long standing industry partnerships. The NWTC provides wind industry manufacturers, developers, and operators with turbine and component testing all in one convenient location. Although industry utilizes sophisticated modeling tools to design and optimize turbine configurations, there are always limitations in modeling capabilities, and testing is a necessity to ensure performance and reliability. Designs require validation and testing is the only way to determine if there are flaws. Prototype testing is especially important in capturing manufacturing flaws that might require fleet-wide retrofits. The NWTC works with its industry partners to verify the performance and reliability of wind turbines that range in size from 400 Watts to 3 megawatts. Engineers conduct tests on components and full-scale turbines in laboratory environments and in the field. Test data produced from these tests can be used to validate turbine design codes and simulations that further advance turbine designs.

  6. OM Code Requirements For MOVs -- OMN-1 and Appendix III

    SciTech Connect (OSTI)

    Kevin G. DeWall

    2011-08-01

    The purpose or scope of the ASME OM Code is to establish the requirements for pre-service and in-service testing of nuclear power plant components to assess their operational readiness. For MOVs this includes those that perform a specific function in shutting down a reactor to the safe shutdown condition, maintaining the safe shutdown condition, and mitigating the consequences of an accident. This paper will present a brief history of industry and regulatory activities related to MOVs and the development of Code requirements to address weaknesses in earlier versions of the OM Code. The paper will discuss the MOV requirements contained in the 2009 version of ASME OM Code, specifically Mandatory Appendix III and OMN-1, Revision 1.

  7. Audit Requirements for For-Profit Recipients

    Broader source: Energy.gov [DOE]

    In association with the Office of Risk management, we are issuing guidance implementing the requirements of 10 CFR 600.316 which contains audit requirements for for-profit recipients of financial assistance awards (prime awards) and sub-awards.

  8. land requirements | OpenEI Community

    Open Energy Info (EERE)

    land requirements Home Sfomail's picture Submitted by Sfomail(48) Member 25 June, 2013 - 12:10 Solar Land Use Data on OpenEI acres csp land use how much land land requirements pv...

  9. Salt Lake City- High Performance Buildings Requirement

    Broader source: Energy.gov [DOE]

    Salt Lake City's mayor issued an executive order in July 2005 requiring that all public buildings owned and controlled by the city be built or renovated to meet the requirements of LEED "silver"...

  10. Federal Prison Industries-Requirement for Market

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WWVv .acQnet.govfarlF ACfac200 1-21.i2Qf Effective Date: March 26, 2004 Federal Prison Industries-Requirement for Market 023) This interira rule amends FAR parts 8, Required...

  11. Decisions Regarding Drug Testing for DOE Positions That Require Access Authorization (Security Clearances)

    Energy Savers [EERE]

    Dealing With the Issues of Nuclear Energy Dealing With the Issues of Nuclear Energy September 17, 2010 - 12:39pm Addthis Secretary Chu Secretary Chu Former Secretary of Energy What does this mean for me? The U.S. is working to reduce our own reliance on nuclear weapons and to lock down dangerous nuclear material so terrorists can't use it. Editorial Note: This has been cross-posted from Huffington Post. Next week I have the honor of leading the U.S. delegation to an annual conference that is

  12. Desludging of N Reactor fuel canisters: Analysis, Test, and data requirements

    SciTech Connect (OSTI)

    Johnson, A.B. Jr.

    1996-01-01

    The N Reactor fuel is currently stored in canisters in the K East (KE) and K West (KW) Basins. In KE, the canisters have open tops; in KW, the cans have sealed lids, but are vented to release gases. Corrosion products have formed on exposed uranium metal fuel, on carbon steel basin component surfaces, and on aluminum alloy canister surfaces. Much of the corrosion product is retained on the corroding surfaces; however, large inventories of particulates have been released. Some of the corrosion product particulates form sludge on the basin floors; some particulates are retained within the canisters. The floor sludge inventories are much greater in the KE Basin than in the KW Basin because KE Basin operated longer and its water chemistry was less controlled. Another important factor is the absence of lids on the KE canisters, allowing uranium corrosion products to escape and water-borne species, principally iron oxides, to settle in the canisters. The inventories of corrosion products, including those released as particulates inside the canisters, are only beginning to be characterized for the closed canisters in KW Basin. The dominant species in the KE floor sludge are oxides of aluminum, iron, and uranium. A large fraction of the aluminum and uranium floor sludge particulates may have been released during a major fuel segregation campaign in the 1980s, when fuel was emptied from 4990 canisters. Handling and jarring of the fuel and aluminum canisters seems likely to have released particulates from the heavily corroded surfaces. Four candidate methods are discussed for dealing with canister sludge emerged in the N Reactor fuel path forward: place fuel in multi-canister overpacks (MCOs) without desludging; drill holes in canisters and drain; drill holes in canisters and flush with water; and remove sludge and repackage the fuel.

  13. Requirements for a Standard Test to Rate the Durability of PV Modules at System Voltage (Presentation)

    SciTech Connect (OSTI)

    Hacke, P.; Terwilliger, K.; Glick, S.; Kempe, M.; Kurtz, S.; Bennett, I.; Kloos, M.

    2011-02-01

    Degradation modes in photovoltaic modules under system bias voltage stress are described and classified.

  14. NERSC HPC Program Requirements Review Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Published Reports NERSC HPC Program Requirements Review Reports These publications comprise the final reports from the HPC requirements reviews presented to the Department of Energy. Downloads ASCR2017Final.pdf | Adobe Acrobat PDF file Large Scale Computing and Storage Requirements for Advanced Scientific Computing Research - Target 2017 NerscBES2017ReqRevFinal.pdf | Adobe Acrobat PDF file Large Scale Computing and Storage Requirements for Basic Energy Sciences - Target 2017

  15. NERSC HPC Requirements Reviews: Target 2017

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Basic Energy Sciences (BES) Biological and Environmental Research (BER) Fusion Energy Sciences (FES) High Energy Physics (HEP) Nuclear Physics (NP) Requirements Reviews: Target 2014 Overview Published Reports Case Study FAQs NERSC HPC Achievement Awards Share Your Research User Submitted Research Citations NERSC Citations Home » Science at NERSC » HPC Requirements Reviews » Requirements Reviews: Target 2017 NERSC HPC Requirements Reviews: Target 2017 NERSC and the Office of Advanced

  16. Web Writing Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements Web Writing Requirements When writing content for Office of Energy Efficiency and Renewable Energy (EERE) websites and applications, follow these requirements. Also see EERE's Web writing best practices. Plain Language Always follow the requirements of the Plain Writing Act of 2010. Introductory Text Introductory text, or "intro text" is the first 1-2 sentences on a Web page. This is indexed by search engines. Additionally, intro text is the first content on the Web page,

  17. Quality Assurance Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements Quality Assurance Requirements The QARD provides the framework for both the achievement and verification of quality. PDF icon Quality Assurance Requirements and Description More Documents & Publications Office of Civilian Radioactive Waste Management-Quality Assurance Requirements and Description QA Corporate Board Meeting - December 2013 Protocol for EM Review/Field Self-Assessment of Site Specific Quality Assurance Programs/Quality Implementation Plans

  18. Building America Retrofit Participation Requirements and Release

    Broader source: Energy.gov [DOE]

    This form is for Building America team members and homeowners to complete verifying health and safety requirements have been met.

  19. Requirements to coordinate agreements, milestones and decision...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to coordinate agreements, milestones and decision documents (AMDD) Requirements to coordinate agreements, milestones and decision documents (AMDD) Environmental agreements,...

  20. 2006 Final Transmission Proposal: Revenue Requirement Study Documentation.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    2005-06-01

    The purpose of the Revenue Requirement Study (Study) is to establish the level of revenues needed from rates for Bonneville Power Administration's (BPA's) transmission and ancillary services to recover, in accordance with sound business principles, costs associated with the transmission of electric power over the Federal Columbia River Transmission System (FCRTS). The FCRTS is part of the larger Federal Columbia River Power System (FCRPS) which also includes the hydroelectric, multipurpose facilities constructed and operated by the U.S. Army Corps of Engineers and the Bureau of Reclamation in the Pacific Northwest. The FCRPS costs that are not included in the FCRTS costs are funded and repaid through BPA power rates. The transmission revenue requirements herein include: recovery of the Federal investment in transmission and transmission-related assets; the operations and maintenance (O&M) and other annual expenses associated with the provision of transmission and ancillary services; the cost of generation inputs for ancillary services and other between business-line services necessary for the transmission of power; and all other transmission-related costs incurred by the Administrator. The cost evaluation period for this rate proposal includes Fiscal Years (FYs) 2005-2007, the period extending from the last year for which historical information is available through the proposed rate test period. The Study includes the transmission revenue requirements for the rate test period, FYs 2006-2007 (Rate Period) and the results of transmission repayment studies. This Study outlines the policies, forecasts, assumptions, and calculations used to determine BPA's transmission revenue requirements. Legal requirements are summarized in Chapter 5 of this Study. The Revenue Requirement Study Documentation (Documentation), TR-06-FS-BPA-01A, contains key technical assumptions and calculations, the results of the transmission repayment studies, and a further explanation of the repayment inputs and its outputs.

  1. Coaxial test fixture

    DOE Patents [OSTI]

    Praeg, Walter F.

    1986-01-01

    An assembly is provided for testing one or more contact material samples in a vacuum environment. The samples are positioned as an inner conductive cylinder assembly which is mounted for reciprocal vertical motion as well as deflection from a vertical axis. An outer conductive cylinder is coaxially positioned around the inner cylinder and test specimen to provide a vacuum enclosure therefor. A power source needed to drive test currents through the test specimens is connected to the bottom of each conductive cylinder, through two specially formed conductive plates. The plates are similar in form, having a plurality of equal resistance current paths connecting the power source to a central connecting ring. The connecting rings are secured to the bottom of the inner conductive assembly and the outer cylinder, respectively. A hydraulic actuator is also connected to the bottom of the inner conductor assembly to adjust the pressure applied to the test specimens during testing. The test assembly controls magnetic forces such that the current distribution through the test samples is symmetrical and that contact pressure is not reduced or otherwise disturbed.

  2. Advanced Test Reactor Tour

    ScienceCinema (OSTI)

    Miley, Don

    2013-05-28

    The Advanced Test Reactor at Idaho National Laboratory is the foremost nuclear materials test reactor in the world. This virtual tour describes the reactor, how experiments are conducted, and how spent nuclear fuel is handled and stored. For more information about INL research, visit http://www.facebook.com/idahonationallaboratory.

  3. Kauai Test Facility

    SciTech Connect (OSTI)

    Hay, R.G.

    1982-01-01

    The Kauai Test Facility (KTF) is a Department of Energy rocket launch facility operated by Sandia National Laboratories. Originally it was constructed in support of the high altitude atmospheric nuclear test phase of operation Dominic in the early 1960's. Later, the facility went through extensive improvement and modernization to become an integral part of the Safeguard C readiness to resume nuclear testing program. Since its inception and build up, in the decade of the sixties and the subsequent upgrades of the seventies, range test activities have shifted from full scale test to emphasis on research and development of materials and components, and to making high altitude scientific measurements. Primarily, the facility is intended to be utilized in support of development programs at the DOE weapons laboratories, however, other organizations may make use of the facility on a non-interface basis. The physical components at KTF and their operation are described.

  4. Nanomechanical testing system

    DOE Patents [OSTI]

    Vodnick, David James; Dwivedi, Arpit; Keranen, Lucas Paul; Okerlund, Michael David; Schmitz, Roger William; Warren, Oden Lee; Young, Christopher David

    2015-01-27

    An automated testing system includes systems and methods to facilitate inline production testing of samples at a micro (multiple microns) or less scale with a mechanical testing instrument. In an example, the system includes a probe changing assembly for coupling and decoupling a probe of the instrument. The probe changing assembly includes a probe change unit configured to grasp one of a plurality of probes in a probe magazine and couple one of the probes with an instrument probe receptacle. An actuator is coupled with the probe change unit, and the actuator is configured to move and align the probe change unit with the probe magazine and the instrument probe receptacle. In another example, the automated testing system includes a multiple degree of freedom stage for aligning a sample testing location with the instrument. The stage includes a sample stage and a stage actuator assembly including translational and rotational actuators.

  5. Nanomechanical testing system

    DOE Patents [OSTI]

    Vodnick, David James; Dwivedi, Arpit; Keranen, Lucas Paul; Okerlund, Michael David; Schmitz, Roger William; Warren, Oden Lee; Young, Christopher David

    2014-07-08

    An automated testing system includes systems and methods to facilitate inline production testing of samples at a micro (multiple microns) or less scale with a mechanical testing instrument. In an example, the system includes a probe changing assembly for coupling and decoupling a probe of the instrument. The probe changing assembly includes a probe change unit configured to grasp one of a plurality of probes in a probe magazine and couple one of the probes with an instrument probe receptacle. An actuator is coupled with the probe change unit, and the actuator is configured to move and align the probe change unit with the probe magazine and the instrument probe receptacle. In another example, the automated testing system includes a multiple degree of freedom stage for aligning a sample testing location with the instrument. The stage includes a sample stage and a stage actuator assembly including translational and rotational actuators.

  6. Nanomechanical testing system

    DOE Patents [OSTI]

    Vodnick, David James; Dwivedi, Arpit; Keranen, Lucas Paul; Okerlund, Michael David; Schmitz, Roger William; Warren, Oden Lee; Young, Christopher David

    2015-02-24

    An automated testing system includes systems and methods to facilitate inline production testing of samples at a micro (multiple microns) or less scale with a mechanical testing instrument. In an example, the system includes a probe changing assembly for coupling and decoupling a probe of the instrument. The probe changing assembly includes a probe change unit configured to grasp one of a plurality of probes in a probe magazine and couple one of the probes with an instrument probe receptacle. An actuator is coupled with the probe change unit, and the actuator is configured to move and align the probe change unit with the probe magazine and the instrument probe receptacle. In another example, the automated testing system includes a multiple degree of freedom stage for aligning a sample testing location with the instrument. The stage includes a sample stage and a stage actuator assembly including translational and rotational actuators.

  7. TEST PROCEDURE VALIDATION TEST OF A DISCRIMINATING TRITIUM MONITOR...

    Office of Environmental Management (EM)

    Test Results For Physical Separation Of Tritium From Noble Gases And It's Implications For ... AIR SAMPLERS NEW FAMILY OF STACK MONITORS TEST PROCEDURE VALIDATION TEST OF A ...

  8. SIENA Customer Problem Statement and Requirements

    SciTech Connect (OSTI)

    L. Sauer; R. Clay; C. Adams; H. Walther; B. Allan; R. Mariano; C. Poore; B. Whiteside; B. Boughton; J. Dike; E. Hoffman; R. Hogan; C. LeGall

    2000-08-01

    This document describes the problem domain and functional requirements of the SIENA framework. The software requirements and system architecture of SIENA are specified in separate documents (called SIENA Software Requirement Specification and SIENA Software Architecture, respectively). While currently this version of the document describes the problems and captures the requirements within the Analysis domain (concentrating on finite element models), it is our intention to subsequent y expand this document to describe problems and capture requirements from the Design and Manufacturing domains. In addition, SIENA is designed to be extendible to support and integrate elements from the other domains (see SIENA Software Architecture document).

  9. Baseline Test Specimen Machining Report

    SciTech Connect (OSTI)

    mark Carroll

    2009-08-01

    The Next Generation Nuclear Plant (NGNP) Project is tasked with selecting a high temperature gas reactor technology that will be capable of generating electricity and supplying large amounts of process heat. The NGNP is presently being designed as a helium-cooled high temperature gas reactor (HTGR) with a large graphite core. The graphite baseline characterization project is conducting the research and development (R&D) activities deemed necessary to fully qualify nuclear-grade graphite for use in the NGNP reactor. Establishing nonirradiated thermomechanical and thermophysical properties by characterizing lot-to-lot and billet-to-billet variations (for probabilistic baseline data needs) through extensive data collection and statistical analysis is one of the major fundamental objectives of the project. The reactor core will be made up of stacks of graphite moderator blocks. In order to gain a more comprehensive understanding of the varying characteristics in a wide range of suitable graphites, any of which can be classified as nuclear grade, an experimental program has been initiated to develop an extensive database of the baseline characteristics of numerous candidate graphites. Various factors known to affect the properties of graphite will be investigated, including specimen size, spatial location within a graphite billet, specimen orientation within a billet (either parallel to [P] or transverse to [T] the long axis of the as-produced billet), and billet-to-billet variations within a lot or across different production lots. Because each data point is based on a certain position within a given billet of graphite, particular attention must be paid to the traceability of each specimen and its spatial location and orientation within each billet. The evaluation of these properties is discussed in the Graphite Technology Development Plan (Windes et. al, 2007). One of the key components in the evaluation of these graphite types will be mechanical testing on specimens drawn from carefully controlled sections of each billet. To this end, this report will discuss the machining of the first set of test specimens that will be evaluated in this program through tensile, compressive, and flexural testing. Validation that the test specimens have been produced to the tolerances required by the applicable ASTM standards, and to the quality control levels required by this program, will demonstrate the viability of sending graphite to selected suppliers that will provide valuable and certifiable data to future data sets that are integral to the NGNP program and beyond.

  10. CERTS Microgrid Laboratory Test Bed

    SciTech Connect (OSTI)

    ETO, J.; LASSETER, R.; SCHENKMAN, B.; STEVENS, J.; KLAPP, D.; VOLKOMMER, H.; LINTON, E.; HURTADO, H.; ROY, J.

    2010-06-08

    The objective of the CERTS Microgrid Test Bed project was to enhance the ease of integrating energy sources into a microgrid. The project accomplished this objective by developing and demonstrating three advanced techniques, collectively referred to as the CERTS Microgrid concept, that significantly reduce the level of custom field engineering needed to operate microgrids consisting of generating sources less than 100kW. The techniques comprising the CERTS Microgrid concept are: 1 a method for effecting automatic and seamless transitions between grid-connected and islanded modes of operation, islanding the microgrid's load from a disturbance, thereby maintaining a higher level of service, without impacting the integrity of the utility's electrical power grid; 2 an approach to electrical protection within a limited source microgrid that does not depend on high fault currents; and 3 a method for microgrid control that achieves voltage and frequency stability under islanded conditions without requiring high-speed communications between sources.

  11. Westinghouse Test Stand Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved MT-14-12 Westinghouse VERA Test Stand Zero Power Physics Test Simulations for the AP1000® PWR Fausto Franceschini, Westinghouse Electric Company LLC Andrew Godfrey, Oak Ridge National Laboratory Joel Kulesza, Westinghouse Electric Company LLC Robert Oelrich, Westinghouse Electric Company LLC L3.AMA.VDT.P8.01 Milestone Report CASL-U-2014-0012-000 March 6, 2014 MT-14-12 Westinghouse VERA Test Stand

  12. Rapid prototype and test

    SciTech Connect (OSTI)

    Gregory, D.L.; Hansche, B.D.

    1996-06-01

    In order to support advanced manufacturing, Sandia has acquired the capability to produce plastic prototypes using stereolithography. Currently, these prototypes are used mainly to verify part geometry and ``fit and form`` checks. This project investigates methods for rapidly testing these plastic prototypes, and inferring from prototype test data actual metal part performance and behavior. Performances examined include static load/stress response, and structural dynamic (modal) and vibration behavior. The integration of advanced non-contacting measurement techniques including scanning laser velocimetry, laser holography, and thermoelasticity into testing of these prototypes is described. Photoelastic properties of the epoxy prototypes to reveal full field stress/strain fields are also explored.

  13. STAR Test Environment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    STAR Test Environment STAR Test Environment These instructions describe how to set up the STAR environment independent of the production environment in order to test different installations in $OPTSTAR and $GROUP_DIR. If you want to modify those installations you will need access to the starofl account. Bypass STAR envionment login Edit your ~/.pdsf_setup file changing the STAR_LINUX_SETUP to "use_none" and start a new session. You should not see all the STAR environmental variables

  14. Robust Systems Test Framework

    Energy Science and Technology Software Center (OSTI)

    2003-01-01

    The Robust Systems Test Framework (RSTF) provides a means of specifying and running test programs on various computation platforms. RSTF provides a level of specification above standard scripting languages. During a set of runs, standard timing information is collected. The RSTF specification can also gather job-specific information, and can include ways to classify test outcomes. All results and scripts can be stored into and retrieved from an SQL database for later data analysis. RSTF alsomore » provides operations for managing the script and result files, and for compiling applications and gathering compilation information such as optimization flags.« less

  15. Y-12 builds capacity to meet nuclear testing schedule - Or: ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    demands of the nuclear testing program of the 1950's through September 23, 1992, required Y-12 management to purchase and install a huge amount of specialized machinery. It was...

  16. HEV America Baseline Test Sequence

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BASELINE TEST SEQUENCE Revision 1 September 1, 2006 Prepared by Electric Transportation ... All Rights Reserved HEV America Baseline Test Sequence Page 1 HEV PERFORMANCE TEST ...

  17. Galveston Test | Open Energy Information

    Open Energy Info (EERE)

    Galveston Test Jump to: navigation, search Name Galveston Test Facility Galveston Test Sector Wind energy Facility Type Offshore Wind Facility Status Proposed Owner Coastal Point...

  18. Wave Energy Research, Testing and Demonstration Center

    SciTech Connect (OSTI)

    Batten, Belinda

    2014-09-30

    The purpose of this project was to build upon the research, development and testing experience of the Northwest National Marine Renewable Energy Center (NNMREC) to establish a non-grid connected open-ocean testing facility for wave energy converters (WECs) off the coast of Newport, Oregon. The test facility would serve as the first facility of its kind in the continental US with a fully energetic wave resource where WEC technologies could be proven for west coast US markets. The test facility would provide the opportunity for self-contained WEC testing or WEC testing connected via an umbilical cable to a mobile ocean test berth (MOTB). The MOTB would act as a “grid surrogate” measuring energy produced by the WEC and the environmental conditions under which the energy was produced. In order to realize this vision, the ocean site would need to be identified through outreach to community stakeholders, and then regulatory and permitting processes would be undertaken. Part of those processes would require environmental baseline studies and site analysis, including benthic, acoustic and wave resource characterization. The MOTB and its myriad systems would need to be designed and constructed.The first WEC test at the facility with the MOTB was completed within this project with the WET-NZ device in summer 2012. In summer 2013, the MOTB was deployed with load cells on its mooring lines to characterize forces on mooring systems in a variety of sea states. Throughout both testing seasons, studies were done to analyze environmental effects during testing operations. Test protocols and best management practices for open ocean operations were developed. As a result of this project, the non-grid connected fully energetic WEC test facility is operational, and the MOTB system developed provides a portable concept for WEC testing. The permitting process used provides a model for other wave energy projects, especially those in the Pacific Northwest that have similar environmental considerations. While the non-grid connected testing facility provides an option for WEC developers to prove their technology in a fully-energetic wave environment, the absence of grid connection is somewhat of a limitation. To prove that their technology is commercially viable, developers seek a multi-year grid connected testing option. To address this need, NNMREC is developing a companion grid connected test facility in Newport, Oregon, where small arrays of WECs can be tested as well.

  19. Wind Technology Testing Center Acquires New Blade Fatigue Test...

    Energy Savers [EERE]

    Technology Testing Center Acquires New Blade Fatigue Test System Wind Technology Testing Center Acquires New Blade Fatigue Test System August 1, 2013 - 4:33pm Addthis This is an ...

  20. Request for Information: Operation of Regional Test Center Test...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information: Operation of Regional Test Center Test Bed Located at SolarTAC Request for Information: Operation of Regional Test Center Test Bed Located at SolarTAC Solicitation...

  1. A modified heat leak test facility employing a closed-cycle helium refrigerator

    SciTech Connect (OSTI)

    Boroski, W.N.

    1996-01-01

    A Heat Leak Test Facility (HLTF) has been in use at Fermilab for many years. The apparatus has successfully measured the thermal performance of a variety of cryostat components under simulated operating conditions. While an effective tool in the cryostat design process, the HLTF has several limitations. Temperatures are normally fixed at cryogen boiling points and run times are limited to cryogen inventory. Moreover, close personnel attention is required to maintain system inventories and sustain system equilibrium. To provide longer measurement periods without perturbation and to minimize personnel interaction, a new heat leak measurement facility (HLTF-2) has been designed that incorporates a closed-cycle helium refrigerator. The two-stage refrigerator provides cooling to the various temperature stations of the HLTF while eliminating the need for cryogens. Eliminating cryogen inventories has resulted in a reduction of the amount of direct personnel attention required.

  2. National Ignition Facility sub-system design requirements integrated timing system SSDR 1.5.3

    SciTech Connect (OSTI)

    Wiedwald, J.; Van Aersau, P.; Bliss, E.

    1996-08-26

    This System Design Requirement document establishes the performance, design, development, and test requirements for the Integrated Timing System, WBS 1.5.3 which is part of the NIF Integrated Computer Control System (ICCS). The Integrated Timing System provides all temporally-critical hardware triggers to components and equipment in other NIF systems.

  3. PAM stack test utility

    Energy Science and Technology Software Center (OSTI)

    2007-08-22

    The pamtest utility calls the normal PAM hooks using a service and username supplied on the command line. This allows an administratory to test any one of many configured PAM stacks as any existing user on the machine.

  4. Irrigation Pump Testing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of the pump's operating performance including lift, discharge pressure, power input, and water flow. The results of the pump test provide a value for the overall efficiency of the...

  5. Project W-320, combined pump winch assembly test - Test report

    SciTech Connect (OSTI)

    Bellomy, J.R., Westinghouse Hanford

    1996-05-15

    Test report documenting results of the Project W-320 combined pump/winch test performed at Lawrence Pumps.

  6. Testing of GFL Geosiphon

    SciTech Connect (OSTI)

    Steimke, J.L.

    2001-07-10

    A full-scale, transparent replica of a GeoSiphon was constructed in the TFL to test a new concept, using a solar powered vacuum pump to remove accumulated gases from the air chamber. It did not have a treatment cell containing iron filings as do the actual TNX GeoSiphons in the field, but it was accurate in all other respects. The gas generation that is observed in an actual GeoSiphon was simulated by air injection at the inlet of the TFL GeoSiphon. After facility shakedown, three stages of testing were conducted: verification testing, parametric testing and long term testing. In verification testing, the TFL GeoSiphon was used to reproduce a particular test at TNX in which the water flowrate decreased gradually as the result of air accumulation at the crest of a siphon without an air chamber. For this test the vacuum pump was not used and the air chamber was initially filled with air rather than water. Agreement between data from the TNX GeoSiphon and the TFL GeoSiphon was good, which gave confidence that the TFL GeoSiphon was a good hydraulic representation of the TNX GeoSiphon. For the remaining tests, the solar powered vacuum pump and air chamber were used. In parametric testing, steady state runs were made for water flowrates ranging from 1 gpm to 19 gpm, air injection rates ranging from 0 to 77 standard cc/min and outfall line angles ranging from vertical to 60 degrees from vertical. In all cases, the air chamber and vacuum pump removed nearly all of the air and the GeoSiphon operated without problems. In long term testing, the GeoSiphon was allowed to run continuously for 21 days at one set of conditions. During this time the solar cell kept the storage battery fully charged at all times and the control circuit for the vacuum pump operated reliably. The solar panel was observed to have a large excess capacity when used with the vacuum pump. With two changes, the concept of using a solar powered vacuum pump attached to an air chamber should be ready for long term use in the field. Those changes are to insulate the air chamber of the GeoSiphon so it will not freeze in the winter and to make the tank from steel rather than transparent plastic.

  7. Request for Testing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Testing - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs Advanced Nuclear Energy

  8. Central Receiver Test Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Receiver Test Facility - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs Advanced

  9. experimental tank tests

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    experimental tank tests - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs Advanced

  10. LEAKAGE TESTING METHOD

    DOE Patents [OSTI]

    McAdams, Wm.A.; Foss, M.H.

    1958-08-12

    A method of testing containers for leaks is described, particularly the testing of containers or cans in which the uranium slugs for nuelear reactors are jacketed. This method involves the immersion of the can in water under l50 pounds of pressure, then removing, drying, and coating the can with anhydrous copper sulfate. Amy water absorbed by the can under pressure will exude and discolor the copper sulfate in the area about the leak.

  11. Test Circuit Service

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Test Circuit Service Network R&D Software-Defined Networking (SDN) Experimental Network Testbeds 100G SDN Testbed Dark Fiber Testbed Test Circuit Service Testbed Results Current Testbed Research Previous Testbed Research Performance (perfSONAR) Software & Tools Development Data for Researchers Partnerships Publications Workshops Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network

  12. Nevada Test Site Environmental Report 2004

    SciTech Connect (OSTI)

    BECHTEL NEVADA

    2005-10-01

    The ''Nevada Test Site Environmental Report 2004'' was prepared by Bechtel Nevada (BN) to meet the information needs of the public and the requirements and guidelines of the U.S. Department of Energy (DOE) for annual site environmental reports. This Executive Summary presents the purpose of the document, the major programs conducted at the Nevada Test Site (NTS), NTS key environmental initiatives, radiological releases and potential doses to the public resulting from site operations, a summary of non-radiological releases, implementation status of the NTS Environmental Management System, and significant environmental accomplishments. Much of the content of this Executive Summary is also presented in a separate stand-alone pamphlet titled ''Nevada Test Site Environmental Report Summary 2004''. It was produced this year to provide a more cost-effective and wider distribution of a hardcopy summary of the ''Nevada Test Site Environmental Report 2004'' to interested DOE stakeholders.

  13. Field Testing of Compartmentalization Methods for Multifamily Construction

    SciTech Connect (OSTI)

    Ueno, K.; Lstiburek, J. W.

    2015-03-01

    The 2012 International Energy Conservation Code (IECC) has an airtightness requirement of 3 air changes per hour at 50 Pascals test pressure (3 ACH50) for single-family and multifamily construction (in climate zones 3–8). The Leadership in Energy & Environmental Design certification program and ASHRAE Standard 189 have comparable compartmentalization requirements. ASHRAE Standard 62.2 will soon be responsible for all multifamily ventilation requirements (low rise and high rise); it has an exceptionally stringent compartmentalization requirement. These code and program requirements are driving the need for easier and more effective methods of compartmentalization in multifamily buildings.

  14. Test report - caustic addition system operability test procedure

    SciTech Connect (OSTI)

    Parazin, R.E.

    1995-10-13

    This Operability Test Report documents the test results of test procedure WHC-SD-WM-OTP-167 ``Caustic Addition System Operability Test Procedure``. The Objective of the test was to verify the operability of the 241-AN-107 Caustic Addition System. The objective of the test was met

  15. Nevada Test Site Environmental Report 2005

    SciTech Connect (OSTI)

    Cathy A. Wills

    2006-10-01

    The Nevada Test Site Environmental Report 2005 (NTSER) was prepared to meet the information needs of the public and the requirements and guidelines of the U.S. Department of Energy (DOE) for annual site environmental reports. Its purpose is to (1) report compliance status with environmental standards and requirements, (2) present results of environmental monitoring of radiological and nonradiological effluents, (3) report estimated radiological doses to the public from releases of radioactive material, (4) summarize environmental incidents of noncompliance and actions taken in response to them, (5) describe the NTS Environmental Management System and characterize its performance, and (6) highlight significant environmental programs and efforts.

  16. Nevada Test Site Waste Acceptance Criteria

    SciTech Connect (OSTI)

    U. S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2005-10-01

    This document establishes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive (LLW) and mixed waste (MW) for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NTS Area 3 and Area 5 Radioactive Waste Management Complex (RWMC) for storage or disposal.

  17. PUNCTURE TEST CHARACTERIZATION OF GLOVEBOX GLOVES

    SciTech Connect (OSTI)

    Korinko, P.; Chapman, G.

    2012-02-29

    An experiment was conducted to determine the puncture resistance of 15 gloves that are used or proposed for use in the Tritium Facility at Savannah River Site (SRS). These data will serve as a baseline for characterization and may be incorporated into the glove procurement specification. The testing was conducted in agreement with ASTM D120 and all of the gloves met or exceeded the minimum requirements. Butyl gloves exhibited puncture resistance nearly 2.5 times the minimum requirements at SRS while Polyurethane was nearly 7.5x the minimum.

  18. NERSC HPC RequirementsReviews: Target 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Basic Energy Sciences (BES) Biological and Environmental Science (BER) Fusion Energy Sciences (FES) High Energy Physics (HEP) Nuclear Physics (NP) Overview Published Reports Case Study FAQs NERSC HPC Achievement Awards Share Your Research User Submitted Research Citations NERSC Citations Home » Science at NERSC » HPC Requirements Reviews » Requirements Reviews: Target 2014 NERSC HPC RequirementsReviews: Target 2014 NERSC and the Office of Advanced Computational Research held six program

  19. Conditions and Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Postdoctoral Research Awards » Award Information » Conditions and Requirements Conditions and Requirements Conditions and requirements for Energy Efficiency and Renewable Energy (EERE) Postdoctoral Research Awards are spelled out below: Length of the Appointment The Energy Efficiency and Renewable Energy (EERE) Postdoctoral Research Awards are for two years. The initial appointment period for the EERE Postdoctoral Research Awards is one year. Appointments may be extended for a second year

  20. Weatherization Assistance Program Quality Work Plan Requirements |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Quality Work Plan Requirements Weatherization Assistance Program Quality Work Plan Requirements Four square graphic of a document, a conversation bubble, a checkbox and a certification seal. The U.S. Department of Energy's Weatherization Assistance Program (WAP) has introduced a comprehensive Quality Work Plan (QWP) that will establish a benchmark for quality home energy upgrades. This plan defines what is required when federal dollars are used to purchase weatherization

  1. Entry Requirements | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Visiting Us / Entry Requirements Entry Requirements Identification and/or Citizenship Requirements When you arrive for your visit, please be prepared to provide us a form of government photo identification such as your driver's license or U.S. passport when you check in with Visitor Services. And, if you are an uncleared visitor - meaning you do not hold a federal security clearance - you will also be asked to complete some documentation to certify your U.S. citizenship. Once all of these

  2. Guidance & Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements Guidance & Requirements The Office of NEPA Policy and Compliance provides guidance and requirement documents to the NEPA community to ensure that the Department's proposed actions comply with the letter and spirit of the National Environmental Policy Act, and to assist the interested public in reviewing NEPA documents. Guidance Guidance documents from the Council on Environmental Quality, Department of Energy, Environmental Protection Agency, and other federal agencies

  3. Appendix IGP: Individual and Groundwater Protection Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IGP-2014 Individual and Groundwater Protection Requirements United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico Compliance Recertification Application 2014 Appendix IGP-2014 Individual and Groundwater Protection Requirements Table of Contents IGP-1.0 Introduction IGP-2.0 Individual Protection Requirements IGP-2.1 Compliance Assessment of Undisturbed Performance IGP-2.2 Dose Calculation IGP-2.2.1 Transport Pathway IGP-2.2.2 Bounding Analysis

  4. Present and Future Computing Requirements for PETSc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Future Computing Requirements for PETSc Jed Brown jedbrown@mcs.anl.gov Mathematics and Computer Science Division, Argonne National Laboratory Department of Computer Science, ...

  5. Thompson named VP of Northwest Requirements Marketing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Thompson-named-VP-of-Northwest-Requirements-Marketing Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand...

  6. HEP/NP Requirements Review 2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NP Program Offices. These requirements will serve as input to the ESnet architecture and planning processes, and will help ensure that ESnet continues to provide world-class...

  7. ADA Requirements for Workplace Charging Installation | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    individuals with disabilities. This Guidance provides best practices, special design guidelines and requirements for installing plug-in electric vehicle charging stations in ...

  8. Web Requirements and Best Practices for PDFs

    Broader source: Energy.gov [DOE]

    The Office of Energy Efficiency and Renewable Energy (EERE) has requirements for creating PDFs that are compliant with Section 508 and are optimized for search engine optimization.

  9. REQUIREMENTS BASED SURVEILLANCE AND MAINTENANCE REVIEW PROCESS...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    I. Approximate number of personnel and man-hours required to complete the activity ... time) Number of Personnel:... Man- Hours:... J. Comments: RBSM ...

  10. NBP RFI: Communications Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    information to the Department of Energy (DOE) on the communications needs of utilities. ... PDF icon NBP RFI: Communications Requirements More Documents & Publications Response to ...

  11. City of Dubuque- Solar Thermal Licensing Requirement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Installers are also required to obtain a permit before altering or installing a system. Application details are available on the program website.

  12. Richard Gerber! Harvey Wasserman! Requirements Reviews Organizers

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9, 2 014 Requirements Reviews * 1½-day reviews with each Program Office * Computing and storage requirements for next 5 years * Participants - DOE ADs & Program Managers - Leading NERSC users & key potential users - NERSC staff 2 High Energy Physics Fusion R esearch Adv. C omp. S cience R esearch J an. 2 014 Basic E nergy S ciences O ct 2 014 Reports From 8 Requirements Reviews Have Been Published 3 h@p://www.nersc.gov/science/hpc---requirements---reviews/reports/ * CompuFng a nd s

  13. Facility Safety - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    facility and programmatic safety requirements for DOE and NNSA for nuclear safety design criteria, fire protection, criticality safety, natural phenomena hazards (NPH)...

  14. Help - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accessibility Text size: (Requires JavaScript) Large Normal Small This site uses the Open Source Content Management System Plone and has been designed to be completely accessible...

  15. News & Updates - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accessibility Text size: (Requires JavaScript) Large Normal Small This site uses the Open Source Content Management System Plone and has been designed to be completely accessible...

  16. Program Evaluation: Requirements and Expectations | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    However, in addition to an office's own self-motivation for engaging in evaluation activity, there are sometimes internal requirements and external drivers for evaluation. Internal ...

  17. E. Required Information (MANDATORY) A. Information Category

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... over the planning period, land transfers and aging ... the proposal for bringing natural gas onto the Hanford Site. ... cyber security requirements and new internet ...

  18. All Required: Safety Training - Chris Westerfeldt

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TUNL Summer 2013 Lectures & Tutorials Thursday May 30 st - 9 AM - 3:30 PM (LSRC Room A247) All Required: Safety Training - Chris Westerfeldt Friday May 31 st - 9 AM REU Required: TUNL, LENA & FEL Tour - (Meet in TUNL Lobby) Monday June 10 th - 10 AM - 11:30 AM (DFELL Conference Room, 117) REU Required: Building Blocks of Nuclei - Mohammad Ahmed Monday June 10 th - 2 PM - 3:30 PM (DFELL Conference Room, 117) REU Required: N-N Interactions and Local Accelerators - Mohammad Ahmed Wednesday

  19. 02-HellandNERSC-Requirements.pptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5, 2014 Barbara Helland Advanced Scientific Computing Research NERSC-ASCR Requirements Review 1 ASCR 2 ... Production Computing for the Office of Science * Characterized by a ...

  20. Biosafety Facilities - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5, Biosafety Facilities by David Freshwater Functional areas: Defense Nuclear Facility Safety and Health Requirement, Safety and Security, The Guide assists DOENNSA field elements...

  1. Training and Certification Requirements for Personnel Utilizing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements for Personnel Utilizing ETA Procedures Prepared by Electric ... ... Donald B. Karner Procedure ETA-GAC005 Revision 1 2 2006 Electric ...

  2. Physical Protection - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2A, Physical Protection by jcronin Functional areas: Security, This Manual establishes requirements for the physical protection of interests under the U.S. Department of Energys...

  3. Site acceptance test, W-030 MICON system

    SciTech Connect (OSTI)

    Hill, L.F., Westinghouse Hanford

    1996-06-10

    Monitoring and control of the W-030 ventilation upgrade is provided by a distributed control system (DCS) furnished by MICON Corporation. After shipment to the Hanford Site, the site acceptance test (SAT) for this system was conducted in a laboratory environment over a six month period, involving four distinct phases and numerous hardware and software modifications required to correct test exceptions. The final results is a system which is not fully compliant with procurement specifications but is determined to meet minimum Project W-030 safety and functional requirements. A negotiated settlement was reached with the supplier to establish a `path forward` for system implementation. This report documents the `as-run` status of the SAT. The SAT was completed in August of 1995. It was later followed by comprehensive acceptance testing of the W-030 control-logic configuration software; results are documented in WHC-SD-W030-ATR-011. Further testing is reported as part of process system startup operational testing, performed after the MICON installation.

  4. Cold moderator test facilities working group

    SciTech Connect (OSTI)

    Bauer, Guenter S.; Lucas, A. T.

    1997-09-01

    The working group meeting was chaired by Bauer and Lucas.Testing is a vital part of any cold source development project. This applies to specific physics concept verification, benchmarking in conjunction with computer modeling and engineering testing to confirm the functional viability of a proposed system. Irradiation testing of materials will always be needed to continuously extend a comprehensive and reliable information database. An ever increasing worldwide effort to enhance the performance of reactor and accelerator based neutron sources, coupled with the complexity and rising cost of building new generation facilities, gives a new dimension to cold source development and testing programs. A stronger focus is now being placed on the fine-tuning of cold source design to maximize its effectiveness in fully exploiting the facility. In this context, pulsed spallation neutron sources pose an extra challenge due to requirements regarding pulse width and shape which result from a large variety of different instrument concepts. The working group reviewed these requirements in terms of their consequences on the needs for testing equipment and compiled a list of existing and proposed facilities suitable to carry out the necessary development work.

  5. FY 2013 Real Property Deferred, Actual, and Required Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement PDF icon FY ...

  6. FY 2012 Real Property Deferred, Actual, and Required Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement PDF icon FY ...

  7. Corrosion testing using isotopes

    DOE Patents [OSTI]

    Hohorst, F.A.

    1995-12-05

    A method is described for determining the corrosion behavior of a material with respect to a medium in contact with the material by: implanting a substantially chemically inert gas in a matrix so that corrosion experienced by the material causes the inert gas to enter the medium; placing the medium in contact with the material; and measuring the amount of inert gas which enters the medium. A test sample of a material whose resistance to corrosion by a medium is to be tested is described composed of: a body of the material, which body has a surface to be contacted by the medium; and a substantially chemically inert gas implanted into the body to a depth below the surface. A test sample of a material whose resistance to corrosion by a medium is to be tested is described composed of: a substrate of material which is easily corroded by the medium, the substrate having a surface; a substantially chemically inert gas implanted into the substrate; and a sheet of the material whose resistance to corrosion is to be tested, the sheet being disposed against the surface of the substrate and having a defined thickness. 3 figs.

  8. Corrosion testing using isotopes

    DOE Patents [OSTI]

    Hohorst, Frederick A.

    1995-12-05

    A method for determining the corrosion behavior of a material with respect to a medium in contact with the material by: implanting a substantially chemically inert gas in a matrix so that corrosion experienced by the material causes the inert gas to enter the medium; placing the medium in contact with the material; and measuring the amount of inert gas which enters the medium. A test sample of a material whose resistance to corrosion by a medium is to be tested, composed of: a body of the material, which body has a surface to be contacted by the medium; and a substantially chemically inert gas implanted into the body to a depth below the surface. A test sample of a material whose resistance to corrosion by a medium is to be tested, composed of: a substrate of material which is easily corroded by the medium, the substrate having a surface; a substantially chemically inert gas implanted into the substrate; and a sheet of the material whose resistance to corrosion is to be tested, the sheet being disposed against the surface of the substrate and having a defined thickness.

  9. Duration Test Report for the Entegrity EW50 Wind Turbine

    SciTech Connect (OSTI)

    Smith, J.; Huskey, A.; Jager, D.; Hur, J.

    2012-12-01

    This report summarizes the results of a duration test that NREL conducted on the Entegrity EW50 wind turbine. This test was conducted in accordance with the International Electrotechnical Commissions' (IEC) standard, Wind Turbine Generator System Part 2: Design requirements for small wind turbines, IEC 61400-2 Ed.2.0, 2006-03.

  10. Researchers Devise New Stress Test for Irradiated Materials

    Office of Energy Efficiency and Renewable Energy (EERE)

    How do you tell if materials are stressed-out? Conventional stress tests for irradiated materials require a significant amount of material, but a new nano-size technique can test the strength of materials using an infinitesimal amount. Learn more.

  11. Conduct of Operations Requirements for DOE Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1990-07-09

    "To provide requirements and guidelines for Departmental Elements, including the National Nuclear Security Administration (NNSA), to use in developing directives, plans, and/or procedures relating to the conduct of operations at DOE facilities. The implementation of these requirements and guidelines should result in improved quality and uniformity of operations. Change 2, 10-23-2001. Canceled by DOE O 422.1.

  12. Requirements for transporting the TMI-2 core

    SciTech Connect (OSTI)

    Wilkins, D.E.

    1983-08-01

    This report summarizes the requirements associated with the actual transport of core debris from the damaged Three Mile Island Unit 2 reactor to the Idaho National Engineering Laboratory. The requirements are discussed under six headings: accountability, security, quality, safety, environment, and transportation.

  13. EIA Radio test

    U.S. Energy Information Administration (EIA) Indexed Site

    September 10, 2012 Test of Energy News Radio Service This is a test audio file of the U.S. Energy Information Administration's energy news radio service to be launched on Tuesday, September 11 th with the release of EIA's monthly Short-Term Energy Outlook. EIA's radio service will provide free short broadcast stories on EIA energy data reports and analysis to radio stations nationwide. The stories will be recorded in MP3 format and can be downloaded from EIA's radio service webpage at

  14. EDD-7 Electric Charge Point Meter test results

    SciTech Connect (OSTI)

    Mersman, C.R.

    1993-09-01

    The results of tests evaluating the electric switching portion of the EDD-7 Electric Charge Point Meter (ECPM) are presented. The ECPM is a modified parking meter that allows the purchase of 120 or 240 volt electric power. The ECPM is designed to make electricity available at any vehicle parking location. The test results indicate that the ECPM operated without failure thru a series of over current and ground fault tests at three different test temperatures. The magnitude of current required to trip the over current protection circuitry varied with temperature while the performance of the ground fault interruption circuitry did not change significantly with the test temperature.

  15. Los Alamos Novel Rocket Design Flight Tested

    ScienceCinema (OSTI)

    Tappan, Bryce

    2015-01-05

    Los Alamos National Laboratory scientists recently flight tested a new rocket design that includes a high-energy fuel and a motor design that also delivers a high degree of safety. Researchers will now work to scale-up the design, as well as explore miniaturization of the system, in order to exploit all potential applications that would require high-energy, high-velocity, and correspondingly high safety margins.

  16. Commissioning of the first drift tube linac module in the Ground Test Accelerator

    SciTech Connect (OSTI)

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Bowling, S.; Cole, R.; Connolly, R.; Denney, P.; Erickson, J.; Gilpatrick, J.D.; Ingalls, W.B.; Kersteins, D.; Kraus, R.; Lysenko, W.P.; McMurry, D.; Mottershead, C.T.; Power, J.; Rose, C.; Rusthoi, D.P.; Sandoval, D.P.; Schneider, J.D.; Smith, M.; Vaughn, G.; Wadlinger, E.A.; Weiss, R.; Yuan, V.

    1993-01-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology required for producing high-brightness, high-current H[sup [minus

  17. Development of 3D Simulation Training and Testing for Home Energy Score Assessor Candidates

    Broader source: Energy.gov [DOE]

    This report summarizes findings from research, analysis, and pilot testing conducted with Assessor candidates across the nation and supports DOE’s new qualification requirements for Assessors.

  18. Requirements Flowdown and Graded Approach to QA

    Office of Environmental Management (EM)

    various consensus standards promulgated by the American Society of Testing Materials (ASTM) and in engineering specifications developed in accordance with design approaches...

  19. Furball Explosive Breakout Test

    SciTech Connect (OSTI)

    Carroll, Joshua David

    2015-08-05

    For more than 30 years the Onionskin test has been the primary way to study the surface breakout of a detonation wave. Currently the Onionskin test allows for only a small, one dimensional, slice of the explosive in question to be observed. Asymmetrical features are not observable with the Onionskin test and its one dimensional view. As a result, in 2011, preliminary designs for the Hairball and Furball were developed then tested. The Hairball used shorting pins connected to an oscilloscope to determine the arrival time at 24 discrete points. This limited number of data points, caused by the limited number of oscilloscope channels, ultimately led to the Hairball’s demise. Following this, the Furball was developed to increase the number of data points collected. Instead of shorting pins the Furball uses fiber optics imaged by a streak camera to determine the detonation wave arrival time for each point. The original design was able to capture the detonation wave’s arrival time at 205 discrete points with the ability to increase the number of data points if necessary.

  20. Micromachine friction test apparatus

    DOE Patents [OSTI]

    deBoer, Maarten P.; Redmond, James M.; Michalske, Terry A.

    2002-01-01

    A microelectromechanical (MEM) friction test apparatus is disclosed for determining static or dynamic friction in MEM devices. The friction test apparatus, formed by surface micromachining, is based on a friction pad supported at one end of a cantilevered beam, with the friction pad overlying a contact pad formed on the substrate. A first electrostatic actuator can be used to bring a lower surface of the friction pad into contact with an upper surface of the contact pad with a controlled and adjustable force of contact. A second electrostatic actuator can then be used to bend the cantilevered beam, thereby shortening its length and generating a relative motion between the two contacting surfaces. The displacement of the cantilevered beam can be measured optically and used to determine the static or dynamic friction, including frictional losses and the coefficient of friction between the surfaces. The test apparatus can also be used to assess the reliability of rubbing surfaces in MEM devices by producing and measuring wear of those surfaces. Finally, the friction test apparatus, which is small in size, can be used as an in situ process quality tool for improving the fabrication of MEM devices.

  1. Audiometry (hearing test)

    Broader source: Energy.gov [DOE]

    The audiogram is an evaluation of how well an individual can hear. Sounds are presented to the individual through earphones during the test. These sounds are presented at different levels of frequency and intensity. The human ear responds to the frequency or pitch of a sound and the intensity or loudness of the sound.

  2. High Efficiency Particulate Air (HEPA) Filter Test Facility (FTF) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy High Efficiency Particulate Air (HEPA) Filter Test Facility (FTF) High Efficiency Particulate Air (HEPA) Filter Test Facility (FTF) DOE-STD-3020-2015 Specification for HEPA Filters Used by DOE Contractors The purpose of this standard is to establish specifications and quality assurance (QA) requirements for the procurement, packaging, shipping and storage of high efficiency particulate air (HEPA) filters. DOE-STD-3025-2007 Quality Assurance Inspection and Testing of HEPA

  3. Instrumentation requirements from the user's view. [For airbreathing hypersonic engines

    SciTech Connect (OSTI)

    Harsha, P.T.

    1988-01-01

    The use of combustor diagnostics is considered from the point of view of demonstration of performance of an airbreathing hypersonic engine. The basic need is seen to be that of providing the data necessary to verify performance predictions for the engine as installed in the airplane. This necessitates the use of a diagnostics capability that can provide the inputs required by the computational analyses that will be used to assess this performance. Because of the cost of ground test facilities, a premium is placed on measurement technique reliability and redundancy of instrumentation. A mix of nonintrusive optical techniques and probe-based measurements is seen to be the best approach using current diagnostics capability; one such instrument mix is outlined for a ramjet/scramjet test program. 11 references.

  4. TRAC-P validation test matrix. Revision 1.0

    SciTech Connect (OSTI)

    Hughes, E.D.; Boyack, B.E.

    1997-09-05

    This document briefly describes the elements of the Nuclear Regulatory Commission`s (NRC`s) software quality assurance program leading to software (code) qualification and identifies a test matrix for qualifying Transient Reactor Analysis Code (TRAC)-Pressurized Water Reactor Version (-P), or TRAC-P, to the NRC`s software quality assurance requirements. Code qualification is the outcome of several software life-cycle activities, specifically, (1) Requirements Definition, (2) Design, (3) Implementation, and (4) Qualification Testing. The major objective of this document is to define the TRAC-P Qualification Testing effort.

  5. Test reports for K Basins vertical fuel handling tools

    SciTech Connect (OSTI)

    Meling, T.A.

    1995-02-01

    The vertical fuel handling tools, for moving N Reactor fuel elements, were tested in the 305 Building Cold Test Facility (CTF) in the 300 Area. After fabrication was complete, the tools were functionally tested in the CTF using simulated N Reactor fuel rods (inner and outer elements). The tools were successful in picking up the simulated N Reactor fuel rods. These tools were also load tested using a 62 pound dummy to test the structural integrity of each assembly. The tools passed each of these tests, based on the performance objectives. Finally, the tools were subjected to an operations acceptance test where K Basins Operations personnel operated the tool to determine its durability and usefulness. Operations personnel were satisfied with the tools. Identified open items included the absence of a float during testing, and documentation required prior to actual use of the tools in the 100 K fuel storage basin.

  6. Upgrade of the cryogenic CERN RF test facility

    SciTech Connect (OSTI)

    Pirotte, O.; Benda, V.; Brunner, O.; Inglese, V.; Maesen, P.; Vullierme, B.; Koettig, T.

    2014-01-29

    With the large number of superconducting radiofrequency (RF) cryomodules to be tested for the former LEP and the present LHC accelerator a RF test facility was erected early in the 1990s in the largest cryogenic test facility at CERN located at Point 18. This facility consisted of four vertical test stands for single cavities and originally one and then two horizontal test benches for RF cryomodules operating at 4.5 K in saturated helium. CERN is presently working on the upgrade of its accelerator infrastructure, which requires new superconducting cavities operating below 2 K in saturated superfluid helium. Consequently, the RF test facility has been renewed in order to allow efficient cavity and cryomodule tests in superfluid helium and to improve its thermal performances. The new RF test facility is described and its performances are presented.

  7. FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting

    Energy Savers [EERE]

    Requirement | Department of Energy Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement PDF icon FY 2012 DARM Transmittal Letter and Attachment Final.pdf More Documents & Publications FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement Real Property Maintenance Reporting Requirement Memorandum (July 13, 2010)

  8. Standard Hydrogen Test Protocols for the NREL Sensor Testing...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hydrogen Test Protocols for the NREL Sensor Testing Laboratory December 2011 NREL is a ... Photo by Robert Burgess, NRELPIX 18420 0 1 Standard Test Protocols for the NREL Hydrogen ...

  9. Quality Assurance Source Requirements Traceability Database

    SciTech Connect (OSTI)

    MURTHY, R., NAYDENOVA, A., DEKLEVER, R., BOONE, A.

    2006-01-30

    At the Yucca Mountain Project the Project Requirements Processing System assists in the management of relationships between regulatory and national/industry standards source criteria, and Quality Assurance Requirements and Description document (DOE/R W-0333P) requirements to create compliance matrices representing respective relationships. The matrices are submitted to the U.S. Nuclear Regulatory Commission to assist in the commission's review, interpretation, and concurrence with the Yucca Mountain Project QA program document. The tool is highly customized to meet the needs of the Office of Civilian Radioactive Waste Management Office of Quality Assurance.

  10. Optical manufacturing requirements for an AVLIS plant

    SciTech Connect (OSTI)

    Primdahl, K.; Chow, R.; Taylor, J.R.

    1997-07-14

    A uranium enrichment plant utilizing Atomic Vapor Laser Isotope Separation (AVLIS) technology is currently being planned. Deployment of the Plant will require tens of thousands of commercial and custom optical components and subsystems. The Plant optical system will be expected to perform at a high level of optical efficiency and reliability in a high-average-power-laser production environment. During construction, demand for this large number of optics must be coordinated with the manufacturing capacity of the optical industry. The general requirements and approach to ensure supply of optical components is described. Dynamic planning and a closely coupled relationship with the optics industry will be required to control cost, schedule, and quality.

  11. TWRS configuration management requirement source document

    SciTech Connect (OSTI)

    Vann, J.M.

    1997-09-17

    The TWRS Configuration Management (CM) Requirement Source document prescribes CM as a basic product life-cycle function by which work and activities are conducted or accomplished. This document serves as the requirements basis for the TWRS CM program. The objective of the TWRS CM program is to establish consistency among requirements, physical/functional configuration, information, and documentation for TWRS and TWRS products, and to maintain this consistency throughout the life-cycle of TWRS and the product, particularly as changes are being made.

  12. DE-SOL-0008449 REPORTING REQUIREMENTS CHECKLIST

    National Nuclear Security Administration (NNSA)

    employee personnel, identified by the Contracting Officer's Representative (COR), who require access to the system on behalf of the U.S. Government. 1.4 DOE Laboratory Personnel- Employees of DOE Laboratory M&O contractors, identified by the COR, who require access to the system in support of Federal Personnel. 1.5 Administrative Contractor Personnel- Employees of non-M&O DOE contractors, identified by the COR, and approved by the Contractor, who require access to the system in support

  13. DE-SOL-0008449 REPORTING REQUIREMENTS CHECKLIST

    National Nuclear Security Administration (NNSA)

    employee personnel, identified by the Contracting Officer's Representative (COR), who require access to the system on behalf of the U.S. Government. 1.4 DOE Laboratory Personnel- Employees of DOE Laboratory M&O contractors, identified by the COR, who require access to the system in support of Federal Personnel. 1.5 Administrative Contractor Personnel- Employees of non-M&O DOE contractors, identified by the COR, and approved by the Contractor, who require access to the system in support

  14. Rescinded Delegations - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Requirements Statutes 42 U.S.C. 4321: National Environmental Policy Act of 1969 42 U.S.C. 4371: Environmental Quality Improvement Act of 1970 42 U.S.C. 7401: Clean Air Act, Section 309 CEQ Regulations 40 CFR Part 1500-1508: CEQ - Regulations for Implementing NEPA DOE Regulations and Orders 10 CFR Part 1021: NEPA Implementing Procedures 10 CFR Part 1021: NEPA Rulemaking Process 10 CFR Part 1022: Compliance with Floodplain and Wetland Environmental Review Requirements DOE O 451.1B:

  15. HTGR Industrial Application Functional and Operational Requirements

    SciTech Connect (OSTI)

    L. E. Demick

    2010-08-01

    This document specifies the functional and performance requirements to be used in the development of the conceptual design of a high temperature gas-cooled reactor (HTGR) based plant supplying energy to a typical industrial facility. These requirements were developed from collaboration with industry and HTGR suppliers over the preceding three years to identify the energy needs of industrial processes for which the HTGR technology is technically and economically viable. The functional and performance requirements specified herein are an effective representation of the industrial sector energy needs and an effective basis for developing a conceptual design of the plant that will serve the broadest range of industrial applications.

  16. Smart gun technology requirements preliminary report

    SciTech Connect (OSTI)

    Weiss, D.R.; Brandt, D.J.; Tweet, K.D.

    1995-05-01

    Goal of the Smart Gun Technology project is to eliminate the capability of an unauthorized user from firing a law enforcement officer`s firearm by implementing user-recognizing-and-authorizing surety technologies. This project is funded by the National Institute of Justice. This document reports the projects first objective: to find and document the requirements for a user-recognizing-and-authorizing firearm technology that law enforcement officers will value. This report details the problem of firearm takeaways in law enforcement, the methodology used to develop the law enforcement officers` requirements, and the requirements themselves.

  17. Building Energy Simulation Test for Existing Homes (BESTEST-EX); Phase 1 Test Procedure: Building Thermal Fabric Cases

    SciTech Connect (OSTI)

    Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.

    2010-08-01

    The U.S. Department of Energy tasked NREL to develop a process for testing the reliability of models that predict retrofit energy savings, including their associated calibration methods. DOE asked NREL to conduct the work in phases so that a test procedure would be ready should DOE need it to meet legislative requirements related to residential retrofits in FY 2010. This report documents the initial 'Phase 1' test procedure.

  18. Nevada Test Site Environmental Report 2003

    SciTech Connect (OSTI)

    Bechtel Nevada

    2004-10-01

    The Nevada Test Site Environmental Report 2003 was prepared by Bechtel Nevada to meet the requirements and guidelines of the U.S. Department of Energy and the information needs of the public. This report is meant to be useful to members of the public, public officials, regulators, and Nevada Test Site contractors. The Executive Summary strives to present in a concise format the purpose of the document, the NTS mission and major programs, a summary of radiological releases and doses to the public resulting from site operations, a summary of non-radiological releases, and an overview of the Nevada Test Site Environmental Management System. The Executive Summary, combined with the following Compliance Summary, are written to meet all the objectives of the report and to be stand-alone sections for those who choose not to read the entire document.

  19. Subsea control system undergoes qualification test

    SciTech Connect (OSTI)

    Lia, A.

    1996-10-01

    The booming market for subsea equipment has spawned the development of new control technologies. Proper testing is required before incorporating these new systems in production applications. In early 1996, French firm ECA began a 6-month test of a lightweight subsea control system at the offshore premises of Frame Engineering in Bergen, Norway. The purpose of the 6-month experiment is to test the various components of a control system. These include the tele-operated valve (TOV), a 66-lb (30-kg) module which provides electrohydraulic control of a Christmas tree, the subsea hydro-electric pump (HPU), the electrical inductively coupled link which provides power and data transmission on a single wire cable, and the subsea mateable optical connector.

  20. Testing of the Eberline PCM-2

    SciTech Connect (OSTI)

    Howe, K.L.

    1994-12-23

    The PCM-2 manufactured by Eberline Instruments is a whole body monitor that detects both alpha and beta contamination. The PCM-2 uses an IBM compatible personal computer for all software functions. The PCM-2 has 34 large area detectors which can cover approximately 40% of the body at a time. This requires two counting cycles to cover approximately 80% of the body. With the normal background seen at Rocky Flats, each count time takes approximately 15--20 seconds. There are a number of beta and gamma whole body monitors available from different manufacturers, but an alpha whole body monitor is a rarity. Because of the need for alpha whole body monitors at The Rocky Flats Environmental Technology Site, it was decided to do thorough testing on the PCM-2. A three month test was run in uranium building and a three month test in a plutonium building to verify the alpha capabilities of the PCM-2.

  1. Simulations of carbon fiber composite delamination tests

    SciTech Connect (OSTI)

    Kay, G

    2007-10-25

    Simulations of mode I interlaminar fracture toughness tests of a carbon-reinforced composite material (BMS 8-212) were conducted with LSDYNA. The fracture toughness tests were performed by U.C. Berkeley. The simulations were performed to investigate the validity and practicality of employing decohesive elements to represent interlaminar bond failures that are prevalent in carbon-fiber composite structure penetration events. The simulations employed a decohesive element formulation that was verified on a simple two element model before being employed to perform the full model simulations. Care was required during the simulations to ensure that the explicit time integration of LSDYNA duplicate the near steady-state testing conditions. In general, this study validated the use of employing decohesive elements to represent the interlaminar bond failures seen in carbon-fiber composite structures, but the practicality of employing the elements to represent the bond failures seen in carbon-fiber composite structures during penetration events was not established.

  2. Iowa Central Quality Fuel Testing Laboratory

    SciTech Connect (OSTI)

    Heach, Don; Bidieman, Julaine

    2013-09-30

    The objective of this project is to finalize the creation of an independent quality fuel testing laboratory on the campus of Iowa Central Community College in Fort Dodge, Iowa that shall provide the exploding biofuels industry a timely and cost-effective centrally located laboratory to complete all state and federal fuel and related tests that are required. The recipient shall work with various state regulatory agencies, biofuel companies and state and national industry associations to ensure that training and testing needs of their members and American consumers are met. The recipient shall work with the Iowa Department of Ag and Land Stewardship on the development of an Iowa Biofuel Quality Standard along with the Development of a standard that can be used throughout industry.

  3. Future Transient Testing of Advanced Fuels

    SciTech Connect (OSTI)

    Jon Carmack

    2009-09-01

    The transient in-reactor fuels testing workshop was held on May 4–5, 2009 at Idaho National Laboratory. The purpose of this meeting was to provide a forum where technical experts in transient testing of nuclear fuels could meet directly with technical instrumentation experts and nuclear fuel modeling and simulation experts to discuss needed advancements in transient testing to support a basic understanding of nuclear fuel behavior under off-normal conditions. The workshop was attended by representatives from Commissariat à l'Énergie Atomique CEA, Japanese Atomic Energy Agency (JAEA), Department of Energy (DOE), AREVA, General Electric – Global Nuclear Fuels (GE-GNF), Westinghouse, Electric Power Research Institute (EPRI), universities, and several DOE national laboratories. Transient testing of fuels and materials generates information required for advanced fuels in future nuclear power plants. Future nuclear power plants will rely heavily on advanced computer modeling and simulation that describes fuel behavior under off-normal conditions. TREAT is an ideal facility for this testing because of its flexibility, proven operation and material condition. The opportunity exists to develop advanced instrumentation and data collection that can support modeling and simulation needs much better than was possible in the past. In order to take advantage of these opportunities, test programs must be carefully designed to yield basic information to support modeling before conducting integral performance tests. An early start of TREAT and operation at low power would provide significant dividends in training, development of instrumentation, and checkout of reactor systems. Early start of TREAT (2015) is needed to support the requirements of potential users of TREAT and include the testing of full length fuel irradiated in the FFTF reactor. The capabilities provided by TREAT are needed for the development of nuclear power and the following benefits will be realized by the refurbishment and restart of TREAT. •TREAT is an absolute necessity in the suite of reactor fuel test capabilities •TREAT yields valuable information on reactivity effects, margins to failure, fuel dispersal, and failure propagation •Most importantly, interpretation of TREAT experiment results is a stringent test of the integrated understanding of fuel performance.

  4. C-106 tank process ventilation test

    SciTech Connect (OSTI)

    Bailey, J.W.

    1998-07-20

    Project W-320 Acceptance Test Report for tank 241-C-106, 296-C-006 Ventilation System Acceptance Test Procedure (ATP) HNF-SD-W320-012, C-106 Tank Process Ventilation Test, was an in depth test of the 296-C-006 ventilation system and ventilation support systems required to perform the sluicing of tank C-106. Systems involved included electrical, instrumentation, chiller and HVAC. Tests began at component level, moved to loop level, up to system level and finally to an integrated systems level test. One criteria was to perform the test with the least amount of risk from a radioactive contamination potential stand point. To accomplish this a temporary configuration was designed that would simulate operation of the systems, without being connected directly to the waste tank air space. This was done by blanking off ducting to the tank and connecting temporary ducting and an inlet air filter and housing to the recirculation system. This configuration would eventually become the possible cause of exceptions. During the performance of the test, there were points where the equipment did not function per the directions listed in the ATP. These events fell into several different categories. The first and easiest problems were field configurations that did not match the design documentation. This was corrected by modifying the field configuration to meet design documentation and reperforming the applicable sections of the ATP. A second type of problem encountered was associated with equipment which did not operate correctly, at which point an exception was written against the ATP, to be resolved later. A third type of problem was with equipment that actually operated correctly but the directions in the ATP were in error. These were corrected by generating an Engineering Change Notice (ECN) against the ATP. The ATP with corrected directions was then re-performed. A fourth type of problem was where the directions in the ATP were as the equipment should operate, but the design of the equipment was not correct for that type of operation. To correct this problem an ECN was generated against the design documents, the equipment modified accordingly, and the ATP re-performed. The last type of problem was where the equipment operated per the direct ions in the ATP, agreed with the design documents, yet violated requirements of the Basis of Interim Operation (BIO). In this instance a Non Conformance Report (NCR) was generated. To correct problems documented on an NCR, an ECN was generated to modify the design and field work performed, followed by retesting to verify modifications corrected noted deficiencies. To expedite the completion of testing and maintain project schedules, testing was performed concurrent with construct on, calibrations and the performance of other ATP`s.

  5. Advanced Vehicle Testing Activity (AVTA) - Vehicle Testing and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications AVTA HEV, NEV, BEV and HICEV Demonstrations and Testing AVTA PHEV Demonstrations and Testing Advanced Vehicle Benchmarking of HEVs and PHEVs

  6. A Residual Mass Ballistic Testing Method to Compare Armor Materials or Components (Residual Mass Ballistic Testing Method)

    SciTech Connect (OSTI)

    Benjamin Langhorst; Thomas M Lillo; Henry S Chu

    2014-05-01

    A statistics based ballistic test method is presented for use when comparing multiple groups of test articles of unknown relative ballistic perforation resistance. The method is intended to be more efficient than many traditional methods for research and development testing. To establish the validity of the method, it is employed in this study to compare test groups of known relative ballistic performance. Multiple groups of test articles were perforated using consistent projectiles and impact conditions. Test groups were made of rolled homogeneous armor (RHA) plates and differed in thickness. After perforation, each residual projectile was captured behind the target and its mass was measured. The residual masses measured for each test group were analyzed to provide ballistic performance rankings with associated confidence levels. When compared to traditional V50 methods, the residual mass (RM) method was found to require fewer test events and be more tolerant of variations in impact conditions.

  7. Automotive Turbocharging: Industrial Requirements and Technology Developments

    Broader source: Energy.gov [DOE]

    Significant improvements in turbocharger performance will be difficult to achieve requires a proper understanding of the trade-offs and engine effects and impacts must be part of turbocharger development

  8. Requirements and Submission Process for Qualified Software

    Broader source: Energy.gov [DOE]

    This document provides a complete list of requirements and submission details to have software qualified for calculating energy and power cost savings for commercial building tax deductions under tax code Section 179D.

  9. Johnson Noise Thermometry System Requirements (Technical Report...

    Office of Scientific and Technical Information (OSTI)

    (ICHMI) research pathway of the U.S. Department of Energy (DOE) Advanced Small Modular Reactor (SMR) Research and Development (R&D) program. The requirements include not only...

  10. Deepwater Offshore Wind Technology Research Requirements (Poster)

    SciTech Connect (OSTI)

    Musial, W.

    2005-05-01

    A poster presentation for AWEA's WindPower 2005 conference in Denver, Colorado, May 15-18, 2005 that provides an outline of the requirements for deepwater offshore wind technology development

  11. Guam- Solar-Ready Residential Building Requirement

    Broader source: Energy.gov [DOE]

    The Guam Energy Code, which became effective in October of 2000, requires that piping stub outs be provided for water heaters installed in low-rise residential buildings to enable the future inst...

  12. College Student Internship Program Requirements and Application...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The work requires travel, including field visits to renewable energy project sites. Hands-On Experience Four people looking at a box attached to a solar panel. Over the course of ...

  13. EPA State Manifest Requirements | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: EPA State Manifest RequirementsLegal Abstract Provided by the EPA, this website provides...

  14. Part V: Section H: Special Contract Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DE-AC36-08GO28308 Modification M801 Section H - Page 2 of 50 PART I SECTION H SPECIAL CONTRACT REQUIREMENTS TABLE OF CONTENTS H.1 No Third Party Beneficiaries...

  15. DE-SOL-0008449 REPORTING REQUIREMENTS CHECKLIST

    National Nuclear Security Administration (NNSA)

    the system in support of Federal Personnel. 2. General Requirements 2.1 Capacity- The Web-Based Reporting System shall have the capacity to contain all documents, including task ...

  16. Energy Efficiency Requirements for State Government

    Broader source: Energy.gov [DOE]

    Public Act No. 07-242 of 2007 established mandatory efficiency requirements for certain equipment purchased by the state. The Connecticut Department of Administrative Services and agencies with p...

  17. San Bernardino County- Green Building Requirement

    Broader source: Energy.gov [DOE]

    In August 2007, the San Bernardino County Board of Supervisors approved a policy requiring that all new county buildings and major renovations be built to LEED Silver standards. The decision was...

  18. Quality Assurance - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    services meet or exceed customers' requirements and expectations. Cancels DOE O 414.1C. Adm Chg 1, 5-8-13 o414.1d4-25-11.pdf -- PDF Document, 243 KB Writer: Colette Broussard...

  19. Energy Star Procurement Requirement for Agencies

    Broader source: Energy.gov [DOE]

    SB 2300 was enacted June 25, 2009 and later codified into law. It requires future office equipment, appliances, lighting, and heating and cooling products and systems purchased by and for the state...

  20. NERSC-BES-Requirements-Yelick10.ppt

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... * 1 petaflop (10 15 ops) in 2010 will require 3MW 3 GW for 1 Exaflop (10 18 opssec) * DARPA committee suggested 200 MW with "usual" scaling * Target for DOE is 20 MW in 2018 goal ...

  1. Longwall dust control field tests

    SciTech Connect (OSTI)

    Not Available

    1984-06-14

    Following are highlights of the observations and conclusions drawn from the certain field tests: The use of Kaiser's wing curtain significantly reduced the average air velocity around the face corner, particularly when the gob curtain was removed (Kaiser's existing procedure). The velocity reduction will result in a lessened tendency for headgate cutout dust to be blown directly into the walkway negatively impacting the operator's exposure. Dust will be more effectively channeled around the face corner and downstream past the shearer body. At shield No. 10, average air velocities were within 15 percent of each other over all four of the curtain configurations tested. This indicated that curtain usage had a minimal effect on airflow levels along the face for Kaiser's given condition of gob consolidation. The high air velocity (spot) readings occurring just downstream of the installed wing curtain were due to leakage through gaps in the curtain around the stageloader. The volume of leakage was not significant, but proved to be helpful in sweeping the downstream headgate region clean of contaminants and preventing recirculation. Kaiser's curtain system design has proven to be very rugged, practical and effective and would be suitable for use in many coal mines. Used in conjunction with the semipermanent stageloader curtain, the wing curtain can remain in position for nearly 30 to 40 feet of face advance before needing to be repositioned. The stageloader curtain itself could be mounted directly to the stageloader for automatic advance with headgate equipment. This would only be feasible if the headgate roof horizon was consistent. Kaiser currently hangs the curtain independently and repositions it as required.

  2. Evaporative oxidation treatability test report

    SciTech Connect (OSTI)

    1995-04-01

    In 1992, Congress passed the Federal Facilities Compliance Act that requires the U.S. Department of Energy (DOE) to treat and dispose of its mixed waste in accordance with the Resource Conservation and Recovery Act (RCRA) land disposal restrictions (LDRs). In response to the need for mixed-waste treatment capacity where available off-site commercial treatment facilities do not exist or cannot be used, the DOE Albuquerque Operations Office (DOE-AL) organized a Treatment Selection Team to match mixed wastes with treatment options and develop a strategy for treatment of its mixed wastes. DOE-AL manages operations at nine sites with mixed-waste inventories. The Treatment Selection Team determined a need to develop mobile treatment capacity to treat wastes at the sites where the wastes are generated. Treatment processes used for mixed waste not only must address the hazardous component (i.e., meet LDRs) but also must contain the radioactive component in a form that allows final disposal while protecting workers, the public, and the environment. On the basis of recommendations of the Treatment Selection Team, DOE-AL assigned projects to the sites to bring mixed-waste treatment capacity on-line. The three technologies assigned to the DOE Grand Junction Projects Office (GJPO) are evaporative oxidation, thermal desorption, and treated wastewater evaporation. Rust Geotech, the DOE-GJPO prime contractor, was assigned to design and fabricate mobile treatment units (MTUs) for these three technologies and to deliver the MTUs to selected DOE-AL sites. To conduct treatability tests at the GJPO, Rust leased a pilot-scale evaporative oxidation unit from the Clemson Technical Center (CTC), Anderson, South Carolina. The purpose of this report is to document the findings and results of tests performed using this equipment.

  3. FAR 12 Required Flowdowns From 52

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    22/2016 GRC USG Commercial Flowdowns - Part 12 Page 1 of 3 Supplier/Subcontractor Commercial Items Flowdown of USG Requirements for DFAR, FAR Part 12 & FAR Part 15 Contracts, and Financial Assistance Grants and Cooperative Agreements U.S. GOVERNMENT REQUIREMENTS Materials or items provided by Seller may contribute to or be incorporated into Purchaser's end items provided to the U.S. Government. As a result, the following terms and conditions are incorporated in this purchase order.

  4. Improving CSE Software through Reproducibility Requirements. (Conference) |

    Office of Scientific and Technical Information (OSTI)

    SciTech Connect Improving CSE Software through Reproducibility Requirements. Citation Details In-Document Search Title: Improving CSE Software through Reproducibility Requirements. Abstract not provided. Authors: Heroux, Michael Allen Publication Date: 2011-02-01 OSTI Identifier: 1109282 Report Number(s): SAND2011-1158C 471476 DOE Contract Number: AC04-94AL85000 Resource Type: Conference Resource Relation: Conference: 4th International Workshop on Software Engineering for Computational

  5. JLab Registration/International Services - Training Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hosting Foreign Nationals Special Note for High School and Undergraduate Students Click Here All High School Studenta and Undergraduate students must also complete the Student Safety and Security Training prior to gaining access to work areas. This course cannot be taken online. Contact the Science Education Office (education@jlab.org) to schedule this training. Training Requirements In order to provide a safe and secure place to work, Jefferson Lab requires all individuals to complete training

  6. Requirements for CEC POP machine protection system

    SciTech Connect (OSTI)

    Pinayev, I.

    2015-02-18

    The requirements of CEC POP machine protection system are meant to prevent damage to a vacuum chamber by a missteered electron beam. In this example, beam energy = 22 MeV, Maximal bunch charge = 5 nC, Maximal repetition rate = 78 kHz, Normalized emittance = 5 mm mrad, Minimal β-function = 1 m. From this information the requirements of the protection system can be calculated by factoring the information into equations to find beam densities and temperature excursions.

  7. Web Maintenance Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Maintenance Requirements Web Maintenance Requirements The Office of Energy Efficiency and Renewable Energy (EERE) expects its offices to review and maintain their online content on an ongoing basis throughout the year. This includes two kinds of maintenance: technical maintenance and content maintenance. Websites that are no longer being maintained should be archived. Read more about EERE's expectations for website maintenance. Maintenance Schedule All Web Coordinators should ensure these tasks

  8. Justification Memoranda - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Justification Memoranda by Diane Johnson Notice of Intent to Revise Department of Energy Order 350.1, Contractor Human Resources Management Program - by Robert Myers - last modified Jun 19, 2014 11:17 AM DOE O 350.1 establishes responsibilities, requirements, and cost allow-ability criteria for the management an oversight of contractor human resource management programs, is being revised to remove contractor requirements from Chapter IV, Compensation, Chapter V, Benefits, and Chapter VI Pensions

  9. Determining Allocation Requirements | Argonne Leadership Computing Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Allocation Management Determining Allocation Requirements Querying Allocations Using cbank Mira/Cetus/Vesta Cooley Policies Documentation Feedback Please provide feedback to help guide us as we continue to build documentation for our new computing resource. [Feedback Form] Determining Allocation Requirements Estimating CPU-Hours for ALCF Blue Gene/Q Systems When estimating CPU-hours for the ALCF Blue Gene/Q systems, it is important to take into consideration the unique aspects of the Blue Gene

  10. Goals and Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Goals and Requirements Goals and Requirements The U.S. Department of Energy's (DOE) Sustainability Performance Office (SPO) oversees departmental compliance with goals outlined in Executive Order (E.O.) 13693, Planning for Sustainability in the Next Decade, and related statutes. Issued on March 19, 2015, E.O. 13693 revokes E.O.s 13514 and 13423, while setting reduction targets for energy use intensity, water use intensity, and greenhouse gas emissions and prescribing other sustainability goals

  11. Level III Mentoring Requirement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Level III Mentoring Requirement Level III Mentoring Requirement Level III applicants must be mentored (minimum of six months) by a Level III or IV FPD or demonstrate equivalency (see below Competency 3.12.2 in the PMCDP's CEG). A formal mentoring agreement must be signed by both parties detailing the goals and activities of the mentoring arrangement, and a signed copy of the agreement must be submitted with the certification application when it is presented to the PMCDP. Applications will be

  12. Training and Required Reading Management Tool

    Energy Science and Technology Software Center (OSTI)

    2009-08-13

    This tool manages training and required reading for groups, facilities, etc – abilities beyond the site training systems. TRRMTool imports training data from controlled site data sources/systems and provides greater management and reporting. Clients have been able to greatly reduce the time and effort required to manage training, have greater accuracy, foster individual accountability, and be proactive in verifying training of support personnel, to maintain compliance.

  13. Visitor Security Requirements | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Visitor Security Requirements NOTE: These requirements do not apply to events held at the SREL Conference Center, which is located outside the security barricade. Before you arrive: I. Obtaining a visitor's badge II. Prohibited articles III. Electronics policy IV. Vehicle inspections When you arrive: Proceed to the badge office (map). Present two forms of identification from the list of acceptable documents, including one photo ID, to receive your badge. You will not receive a badge without

  14. Home - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages

    Personal tools Log in Site Map | Contact Us | Help U.S. Department of Energy Office of Management Current Documents Archived Documents Entire Site Search Site Search only in current section Advanced Search Home Directives Delegations Other Requirements RevCom DPC Resources Directives Tools References Delegation Procedures Archives help Help Directives, Delegations, and Other Requirements Directives Directives All current, archived and draft Directives Delegations Delegations Legal instrument

  15. Hanford analytical services quality assurance requirements documents

    SciTech Connect (OSTI)

    Hyatt, J.E.

    1997-09-25

    Hanford Analytical Services Quality Assurance Requirements Document (HASQARD) is issued by the Analytical Services, Program of the Waste Management Division, US Department of Energy (US DOE), Richland Operations Office (DOE-RL). The HASQARD establishes quality requirements in response to DOE Order 5700.6C (DOE 1991b). The HASQARD is designed to meet the needs of DOE-RL for maintaining a consistent level of quality for sampling and field and laboratory analytical services provided by contractor and commercial field and laboratory analytical operations. The HASQARD serves as the quality basis for all sampling and field/laboratory analytical services provided to DOE-RL through the Analytical Services Program of the Waste Management Division in support of Hanford Site environmental cleanup efforts. This includes work performed by contractor and commercial laboratories and covers radiological and nonradiological analyses. The HASQARD applies to field sampling, field analysis, and research and development activities that support work conducted under the Hanford Federal Facility Agreement and Consent Order Tri-Party Agreement and regulatory permit applications and applicable permit requirements described in subsections of this volume. The HASQARD applies to work done to support process chemistry analysis (e.g., ongoing site waste treatment and characterization operations) and research and development projects related to Hanford Site environmental cleanup activities. This ensures a uniform quality umbrella to analytical site activities predicated on the concepts contained in the HASQARD. Using HASQARD will ensure data of known quality and technical defensibility of the methods used to obtain that data. The HASQARD is made up of four volumes: Volume 1, Administrative Requirements; Volume 2, Sampling Technical Requirements; Volume 3, Field Analytical Technical Requirements; and Volume 4, Laboratory Technical Requirements. Volume 1 describes the administrative requirements applicable to each of the other three volumes and is intended to be used in conjunction with the technical volumes.

  16. Program Requirements | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Program Requirements Participants Academies: USAFA, USNA, USMA, USCGA, USMMA cadets/midshipmen NNSA Sites: LANL, LLNL, SNL, NNSS, Pantex, KC Plant, Y-12 Plant, Savannah River NNSA Headquarters: Defense Programs management Eligibility Requirements Student in good standing Secret security clearance with some authorized to CNWDI (RD) desired Major in physics, chemistry, engineering, material science, life science, computer science, social science (political science, psychology and public affairs)

  17. Individual Reporting Requirements | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration Individual Reporting Requirements DOE Order 472.2, Personnel Security, sets forth reporting requirements for all DOE employees, contractors, and others involved in applying for or holding a DOE access authorization. Reporting must be done verbally within two business days of the event followed by a written confirmation within three additional business days to the Office of Personnel and Facility Clearances and Classification (OPFCC), to include: Legal action effected for a

  18. Part B - Requirements & Funding Information PART B - Requirements and Funding Information

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    b. Part B 1 Part B - Requirements & Funding Information PART B - Requirements and Funding Information Gray highlights are instructions. Remove the instructions from the interagency agreement. Attachment 3.b. Part B 2 PART B - Requirements & Funding Information B.1. Purpose This is an interagency transaction. An interagency transaction is an intra-governmental transaction when the servicing agency uses internal resources to support the requesting agency requirement and is a reimbursable

  19. Novel rocket design flight tested

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Novel rocket design flight tested Novel rocket design flight tested Scientists recently flight tested a new rocket design that includes a high-energy fuel and a motor design that...

  20. LANL surveillance requirements management and surveillance requirements from NA-12 tasking memo

    SciTech Connect (OSTI)

    Hills, Charles R

    2011-01-25

    Surveillance briefing to NNSA to support a tasking memo from NA-12 on Surveillance requirements. This talk presents the process for developing surveillance requirements, discusses the LANL requirements that were issued as part of that tasking memo, and presents recommendations on Component Evaluation and Planning Committee activities for FY11.

  1. HEP BPI QCI Testing Reminders

    Energy Savers [EERE]

    HEAT Loan Minimum Standards and Requirements HEAT Loan Minimum Standards and Requirements Presents additional resources on loan standards and requirements from Elise Avers' presentation on HEAT Loan Minimum Standards and Requirements. PDF icon Minimum Standards and Requirements More Documents & Publications Building America Best Practices Series Vol. 14: Energy Renovations - HVAC: A Guide for Contractors to Share with Homeowners STEP Financial Incentives Summary Energy Saver 101: Home

  2. NREL: Wind Research - Accredited Testing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accredited Testing NREL has testing capabilities that are accredited by the American Association of Laboratory Accreditation (A2LA). Currently, NREL is one of only two facilities in the United States that are A2LA accredited. Small and large wind turbines are given a suite of tests that test acoustic noise emissions, duration, load, power performance, power quality, and safety and function. Each of the tests is briefly described below. Tests are performed to International Electrotechnical

  3. Injectivity Test | Open Energy Information

    Open Energy Info (EERE)

    Geothermal Area (1979) Raft River Geothermal Area 1979 1979 Evaluation of testing and reservoir parameters in geothermal wells at Raft River and Boise, Idaho Injectivity Test...

  4. Stress Test | Open Energy Information

    Open Energy Info (EERE)

    Stress Test Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Technique: Stress Test Details Activities (1) Areas (1) Regions (0) NEPA(0) Exploration...

  5. Test fire environmental testing operations at Mound Applied Technologies

    SciTech Connect (OSTI)

    1992-03-01

    This paper describes Mound Laboratory`s environmental testing operations. The function of environmental testing is to perform quality environmental (thermal, mechanical, spin, resistance, visual) testing/conditioning of inert/explosive products to assure their compliance with specified customer acceptance criteria. Capabilities, organization, equipment specifications, and test facilities are summarized.

  6. Workshop on Program for Elimination of Requirements Marginal to Safety: Proceedings

    SciTech Connect (OSTI)

    Dey, M.; Arsenault, F.; Patterson, M.; Gaal, M.

    1993-09-01

    These are the proceedings of the Public Workshop on the US Nuclear Regulatory Commission`s Program for Elimination of Requirements Marginal to Safety. The workshop was held at the Holiday Inn, Bethesda, on April 27 and 28, 1993. The purpose of the workshop was to provide an opportunity for public and industry input to the program. The workshop addressed the institutionalization of the program to review regulations with the purpose of eliminating those that are marginal. The objective is to avoid the dilution of safety efforts. One session was devoted to discussion of the framework for a performance-based regulatory approach. In addition, panelists and attendees discussed scope, schedules and status of specific regulatory items: containment leakage testing requirements, fire protection requirements, requirements for environmental qualification of electrical equipment, requests for information under 10CFR50.54(f), requirements for combustible gas control systems, and quality assurance requirements.

  7. Sculpt test problem analysis.

    SciTech Connect (OSTI)

    Sweetser, John David

    2013-10-01

    This report details Sculpt's implementation from a user's perspective. Sculpt is an automatic hexahedral mesh generation tool developed at Sandia National Labs by Steve Owen. 54 predetermined test cases are studied while varying the input parameters (Laplace iterations, optimization iterations, optimization threshold, number of processors) and measuring the quality of the resultant mesh. This information is used to determine the optimal input parameters to use for an unknown input geometry. The overall characteristics are covered in Chapter 1. The speci c details of every case are then given in Appendix A. Finally, example Sculpt inputs are given in B.1 and B.2.

  8. Reversal bending fatigue testing

    DOE Patents [OSTI]

    Wang, Jy-An John; Wang, Hong; Tan, Ting

    2014-10-21

    Embodiments for apparatuses for testing reversal bending fatigue in an elongated beam are disclosed. Embodiments are configured to be coupled to first and second end portions of the beam and to apply a bending moment to the beam and create a pure bending condition in an intermediate portion of the beam. Embodiments are further configured to cyclically alternate the direction of the bending moment applied to the beam such that the intermediate portion of the beam cyclically bends in opposite directions in a pure bending condition.

  9. Commercial Items Test Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Attached for your information is a copy of Civilian Agency Acquisition Council (CAAC) Letter 2009-04. It advises that the National Defense Authorization Act for Fiscal Year 201 0, Section 8 16 authorizes extension of the Commercial Items Test Program from January 1,20 10 to January 1,20 12 and that an expedited FAR Case is being processed to insert the new date at FAR 13.500(d). Also attached is a class deviation authorizing the use of simplified acquisition procedures for commercial items up to $5.5 million [$I1 million for acquisitions of commercial items under FAR 13.500(e)

  10. Resonance test system

    DOE Patents [OSTI]

    Musial, Walter; White, Darris

    2011-05-31

    An apparatus (10) for applying at least one load to a specimen (12) according to one embodiment of the invention may comprise a mass (18). An actuator (20) mounted to the specimen (12) and operatively associated with the mass (18) moves the mass (18) along a linear displacement path (22) that is perpendicular to a longitudinal axis of the specimen (12). A control system (26) operatively associated with the actuator (20) operates the actuator (20) to reciprocate the mass (18) along the linear displacement path (22) at a reciprocating frequency, the reciprocating frequency being about equal to a resonance frequency of the specimen (12) in a test configuration.

  11. Vehicle brake testing system

    DOE Patents [OSTI]

    Stevens, Samuel S.; Hodgson, Jeffrey W.

    2002-11-19

    This invention relates to a force measuring system capable of measuring forces associated with vehicle braking and of evaluating braking performance. The disclosure concerns an invention which comprises a first row of linearly aligned plates, a force bearing surface extending beneath and beside the plates, vertically oriented links and horizontally oriented links connecting each plate to a force bearing surface, a force measuring device in each link, a transducer coupled to each force measuring device, and a computing device coupled to receive an output signal from the transducer indicative of measured force in each force measuring device. The present invention may be used for testing vehicle brake systems.

  12. Antifoam degradation testing

    SciTech Connect (OSTI)

    Lambert, D. P.; Zamecnik, J. R.; Newell, D. D.; Williams, M. S.

    2015-08-20

    This report describes the results of testing to quantify the degradation products resulting from the dilution and storage of Antifoam 747. Antifoam degradation is of concern to the Defense Waste Processing Facility (DWPF) due to flammable decomposition products in the vapor phase of the Chemical Process Cell vessels, as well as the collection of flammable and organic species in the offgas condensate. The discovery that hexamethyldisiloxane is formed from the antifoam decomposition was the basis for a Potential Inadequacy in the Safety Analysis declaration by the DWPF.

  13. Laboratory Tests Indicate Conditions that Could Potentially Impact...

    Broader source: Energy.gov (indexed) [DOE]

    may be exposed while in use. The HEPA filters tested were 24" x 24" x 11 .5" DYN E2 media HEPA filters (model number 0-007-U-42-03-NU-11-13-GG- FU5). The tests showed that...

  14. 4X6" Rotary Bayonet LN2 Test Fill

    SciTech Connect (OSTI)

    Fitzpatrick, J.B.; /Fermilab

    1988-08-02

    This engineering note describes a test fill of the 4-inch x 6-inch rotary bayonet test fixture with LN{sub 2}. This test verifies the operation of valves on the fixture, and checks for proper construction/insulation. Further cold testing is imminent (with rotation and moment loading of the bayonet) after proper construction is verified and the test fixture is accepted. While this test fixture is a pressure vessel (4-inch), it does not require special safety treatment because it is under 6-inch in diameter. Flow capacity calculations were done to insure that the relief valve chosen would be capable of handling fire/loss of vacuum conditions. The D-Zero Safety Committee Chairman was notified of this testing.

  15. NONDESTRUCTIVE EDDY CURRENT TESTING

    DOE Patents [OSTI]

    Renken, C.J. Jr.

    1961-05-23

    An eddy current testing device is described for measuring metal continuity independent of probe-to-sample spacing. An inductance would test probe is made a leg of a variable impedance bridge and the bridge is balanced with the probe away from the sample. An a-c signal is applied across the input terminals of the bridge circuit. As the probe is brought into proximity with the metal sample, the resulting impedance change in the probe gives an output signal from the bridge whose phase angle is proportional to the sample continuity and amplitude is proportional to the probe-tosample spacing. The output signal from the bridge is applied to a compensating network where, responsive to amplitude changes from the bridge output signal, a constant phased voltage output is maintained when the sample is continuous regardless of probe-to-sample spacing. A phase meter calibrated to read changes in resistivity of the metal sample measures the phase shift between the output of the compensating network and the original a-c signal applied to the bridge.

  16. Advanced Scientific Computing Research Network Requirements

    SciTech Connect (OSTI)

    Bacon, Charles; Bell, Greg; Canon, Shane; Dart, Eli; Dattoria, Vince; Goodwin, Dave; Lee, Jason; Hicks, Susan; Holohan, Ed; Klasky, Scott; Lauzon, Carolyn; Rogers, Jim; Shipman, Galen; Skinner, David; Tierney, Brian

    2013-03-08

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the U.S. Department of Energy (DOE) Office of Science (SC), the single largest supporter of basic research in the physical sciences in the United States. In support of SC programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 25 years. In October 2012, ESnet and the Office of Advanced Scientific Computing Research (ASCR) of the DOE SC organized a review to characterize the networking requirements of the programs funded by the ASCR program office. The requirements identified at the review are summarized in the Findings section, and are described in more detail in the body of the report.

  17. World nuclear fuel cycle requirements 1991

    SciTech Connect (OSTI)

    Not Available

    1991-10-10

    The nuclear fuel cycle consists of mining and milling uranium ore, processing the uranium into a form suitable for generating electricity, burning'' the fuel in nuclear reactors, and managing the resulting spent nuclear fuel. This report presents projections of domestic and foreign requirements for natural uranium and enrichment services as well as projections of discharges of spent nuclear fuel. These fuel cycle requirements are based on the forecasts of future commercial nuclear power capacity and generation published in a recent Energy Information Administration (EIA) report. Also included in this report are projections of the amount of spent fuel discharged at the end of each fuel cycle for each nuclear generating unit in the United States. The International Nuclear Model is used for calculating the projected nuclear fuel cycle requirements. 14 figs., 38 tabs.

  18. MarFS-Requirements-Design-Configuration-Admin

    SciTech Connect (OSTI)

    Kettering, Brett Michael; Grider, Gary Alan

    2015-07-08

    This document will be organized into sections that are defined by the requirements for a file system that presents a near-POSIX (Portable Operating System Interface) interface to the user, but whose data is stored in whatever form is most efficient for the type of data being stored. After defining the requirement the design for meeting the requirement will be explained. Finally there will be sections on configuring and administering this file system. More and more, data dominates the computing world. There is a sea of data out there in many different formats that needs to be managed and used. Mar means sea in Spanish. Thus, this product is dubbed MarFS, a file system for a sea of data.

  19. Deep Downhole Seismic Testing for Earthquake Engineering Studies

    SciTech Connect (OSTI)

    Stokoe, Kenneth H.; Li, Song Cheng; Cox, Brady R.; Menq, Farn-Yuh; Rohay, Alan C.

    2008-10-17

    Downhole seismic testing is one field test that is commonly used to determine compression-wave (P) and shear-wave (S) velocity profiles in geotechnical earthquake engineering investigations. These profiles are required input in evaluations of the responses to earthquake shaking of geotechnical sites and structures at these sites. In the past, traditional downhole testing has generally involved profiling in the 30- to 150-m depth range. As the number of field seismic investigations at locations with critical facilities has increased, profiling depths have also increased. An improved downhole test that can be used for wave velocity profiling to depths of 300 to 600 m or more is presented.

  20. Test facilities for evaluating nuclear thermal propulsion systems

    SciTech Connect (OSTI)

    Beck, D.F.; Allen, G.C.; Shipers, L.R.; Dobranich, D.; Ottinger, C.A.; Harmon, C.D.; Fan, W.C. ); Todosow, M. )

    1992-09-22

    Interagency panels evaluating nuclear thermal propulsion (NTP) development options have consistently recognized the need for constructing a major new ground test facility to support fuel element and engine testing. This paper summarizes the requirements, configuration, and baseline performance of some of the major subsystems designed to support a proposed ground test complex for evaluating nuclear thermal propulsion fuel elements and engines being developed for the Space Nuclear Thermal Propulsion (SNTP) program. Some preliminary results of evaluating this facility for use in testing other NTP concepts are also summarized.

  1. Large Scale Computing and Storage Requirements for Fusion Energy...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Home Science at NERSC HPC Requirements Reviews Requirements Reviews: Target 2014 Fusion Energy Sciences (FES) Large Scale Computing and Storage Requirements for Fusion ...

  2. States with NEPA-like Environmental Planning Requirements | Department...

    Energy Savers [EERE]

    States with NEPA-like Environmental Planning Requirements States with NEPA-like Environmental Planning Requirements Several states have environmental planning requirements that are...

  3. Hydroshear Simulation Lab Test 2

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Bauer, Steve

    2014-08-01

    This data file is for test 2. In this test a sample of granite with a pre cut (man made fracture) is confined, heated and differential stress is applied. max temperature in this this system development test is 95C. test details on the spreadsheets--note thta there are 2 spreadsheets

  4. Hydroshear Simulation Lab Test 2

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Bauer, Steve

    This data file is for test 2. In this test a sample of granite with a pre cut (man made fracture) is confined, heated and differential stress is applied. max temperature in this this system development test is 95C. test details on the spreadsheets--note thta there are 2 spreadsheets

  5. Pulse Jet Mixing Tests With Noncohesive Solids

    SciTech Connect (OSTI)

    Meyer, Perry A.; Bamberger, Judith A.; Enderlin, Carl W.; Fort, James A.; Wells, Beric E.; Sundaram, S. K.; Scott, Paul A.; Minette, Michael J.; Smith, Gary L.; Burns, Carolyn A.; Greenwood, Margaret S.; Morgen, Gerald P.; Baer, Ellen BK; Snyder, Sandra F.; White, Michael K.; Piepel, Gregory F.; Amidan, Brett G.; Heredia-Langner, Alejandro

    2012-02-17

    This report summarizes results from pulse jet mixing (PJM) tests with noncohesive solids in Newtonian liquid. The tests were conducted during FY 2007 and 2008 to support the design of mixing systems for the Hanford Waste Treatment and Immobilization Plant (WTP). Tests were conducted at three geometric scales using noncohesive simulants, and the test data were used to develop models predicting two measures of mixing performance for full-scale WTP vessels. The models predict the cloud height (the height to which solids will be lifted by the PJM action) and the critical suspension velocity (the minimum velocity needed to ensure all solids are suspended off the floor, though not fully mixed). From the cloud height, the concentration of solids at the pump inlet can be estimated. The predicted critical suspension velocity for lifting all solids is not precisely the same as the mixing requirement for 'disturbing' a sufficient volume of solids, but the values will be similar and closely related. These predictive models were successfully benchmarked against larger scale tests and compared well with results from computational fluid dynamics simulations. The application of the models to assess mixing in WTP vessels is illustrated in examples for 13 distinct designs and selected operational conditions. The values selected for these examples are not final; thus, the estimates of performance should not be interpreted as final conclusions of design adequacy or inadequacy. However, this work does reveal that several vessels may require adjustments to design, operating features, or waste feed properties to ensure confidence in operation. The models described in this report will prove to be valuable engineering tools to evaluate options as designs are finalized for the WTP. Revision 1 refines data sets used for model development and summarizes models developed since the completion of Revision 0.

  6. Ootw Tool Requirements in Relation to JWARS

    SciTech Connect (OSTI)

    Hartley III, D.S.; Packard, S.L.

    1998-01-01

    This document reports the results of the CMke of the Secretary of Defense/Program Analysis & Evaluation (OSD/PA&E) sponsored project to identify how Operations Other Than War (OOTW) tool requirements relate to the Joint Warfare Simulation (JWARS) and, more generally, to joint analytical modeling and simulation (M&S) requirements. It includes recommendations about which OOTW tools (and functionality within tools) should be included in JWARS, which should be managed as joint analytical modeling and simulation (M&S) tools, and which should be left for independent development.

  7. EVALUATION OF REQUIREMENTS FOR THE DWPF HIGHER CAPACITY CANISTER

    SciTech Connect (OSTI)

    Miller, D.; Estochen, E.; Jordan, J.; Kesterson, M.; Mckeel, C.

    2014-08-05

    The Defense Waste Processing Facility (DWPF) is considering the option to increase canister glass capacity by reducing the wall thickness of the current production canister. This design has been designated as the DWPF Higher Capacity Canister (HCC). A significant decrease in the number of canisters processed during the life of the facility would be achieved if the HCC were implemented leading to a reduced overall reduction in life cycle costs. Prior to implementation of the change, Savannah River National Laboratory (SRNL) was requested to conduct an evaluation of the potential impacts. The specific areas of interest included loading and deformation of the canister during the filling process. Additionally, the effect of the reduced wall thickness on corrosion and material compatibility needed to be addressed. Finally the integrity of the canister during decontamination and other handling steps needed to be determined. The initial request regarding canister fabrication was later addressed in an alternate study. A preliminary review of canister requirements and previous testing was conducted prior to determining the testing approach. Thermal and stress models were developed to predict the forces on the canister during the pouring and cooling process. The thermal model shows the HCC increasing and decreasing in temperature at a slightly faster rate than the original. The HCC is shown to have a 3°F ΔT between the internal and outer surfaces versus a 5°F ΔT for the original design. The stress model indicates strain values ranging from 1.9% to 2.9% for the standard canister and 2.5% to 3.1% for the HCC. These values are dependent on the glass level relative to the thickness transition between the top head and the canister wall. This information, along with field readings, was used to set up environmental test conditions for corrosion studies. Small 304-L canisters were filled with glass and subjected to accelerated environmental testing for 3 months. No evidence of stress corrosion cracking was indicated on either the canisters or U-bend coupons. Calculations and finite element modeling were used to determine forces over a range of handling conditions along with possible forces during decontamination. While expected reductions in some physical characteristics were found in the HCC, none were found to be significant when compared to the required values necessary to perform its intended function. Based on this study and a review of successful testing of thinner canisters at West Valley Demonstration Project (WVDP), the mechanical properties obtained with the thinner wall do not significantly undermine the ability of the canister to perform its intended function.

  8. Micro-tensile testing system

    DOE Patents [OSTI]

    Wenski, Edward G.

    2006-01-10

    A micro-tensile testing system providing a stand-alone test platform for testing and reporting physical or engineering properties of test samples of materials having thicknesses of approximately between 0.002 inch and 0.030 inch, including, for example, LiGA engineered materials. The testing system is able to perform a variety of static, dynamic, and cyclic tests. The testing system includes a rigid frame and adjustable gripping supports to minimize measurement errors due to deflection or bending under load; serrated grips for securing the extremely small test sample; high-speed laser scan micrometers for obtaining accurate results; and test software for controlling the testing procedure and reporting results.

  9. Micro-tensile testing system

    DOE Patents [OSTI]

    Wenski, Edward G.

    2007-08-21

    A micro-tensile testing system providing a stand-alone test platform for testing and reporting physical or engineering properties of test samples of materials having thicknesses of approximately between 0.002 inch and 0.030 inch, including, for example, LiGA engineered materials. The testing system is able to perform a variety of static, dynamic, and cyclic tests. The testing system includes a rigid frame and adjustable gripping supports to minimize measurement errors due to deflection or bending under load; serrated grips for securing the extremely small test sample; high-speed laser scan micrometers for obtaining accurate results; and test software for controlling the testing procedure and reporting results.

  10. Micro-tensile testing system

    DOE Patents [OSTI]

    Wenski, Edward G.

    2007-07-17

    A micro-tensile testing system providing a stand-alone test platform for testing and reporting physical or engineering properties of test samples of materials having thicknesses of approximately between 0.002 inch and 0.030 inch, including, for example, LiGA engineered materials. The testing system is able to perform a variety of static, dynamic, and cyclic tests. The testing system includes a rigid frame and adjustable gripping supports to minimize measurement errors due to deflection or bending under load; serrated grips for securing the extremely small test sample; high-speed laser scan micrometers for obtaining accurate results; and test software for controlling the testing procedure and reporting results.

  11. Nevada Test Site Environmental Report 2007

    SciTech Connect (OSTI)

    Cathy Wills

    2008-09-01

    The Nevada Test Site Environmental Report 2007 (NTSER) was prepared to meet the information needs of the public and the requirements and guidelines of the U.S. Department of Energy (DOE) for annual site environmental reports. It was prepared by National Security Technologies, LLC (NSTec). This Executive Summary presents the purpose of the document, the major programs conducted at the Nevada Test Site (NTS), NTS key environmental initiatives, radiological releases and potential doses to the public resulting from site operations, a summary of nonradiological releases, implementation status of the NTS Environmental Management System, a summary of compliance with environmental regulations, pollution prevention and waste minimization accomplishments, and significant environmental accomplishments. Much of the content of this Executive Summary is also presented in a separate stand-alone pamphlet titled Nevada Test Site Environmental Report Summary 2007. This NTSER was prepared to satisfy DOE Order 231.1A, Environment, Safety and Health Reporting. Its purpose is to (1) report compliance status with environmental standards and requirements, (2) present results of environmental monitoring of radiological and nonradiological effluents, (3) report estimated radiological doses to the public from releases of radioactive material, (4) summarize environmental incidents of noncompliance and actions taken in response to them, (5) describe the NTS Environmental Management System and characterize its performance, and (6) highlight significant environmental programs and efforts. This report meets these objectives for the NTS and three offsite Nevada facilities mentioned in this report.

  12. Waste Isolation Pilot Plant Salt Decontamination Testing

    SciTech Connect (OSTI)

    Rick Demmer; Stephen Reese

    2014-09-01

    On February 14, 2014, americium and plutonium contamination was released in the Waste Isolation Pilot Plant (WIPP) salt caverns. At the request of WIPP’s operations contractor, Idaho National Laboratory (INL) personnel developed several methods of decontaminating WIPP salt, using surrogate contaminants and also americium (241Am). The effectiveness of the methods is evaluated qualitatively, and to the extent possible, quantitatively. One of the requirements of this effort was delivering initial results and recommendations within a few weeks. That requirement, in combination with the limited scope of the project, made in-depth analysis impractical in some instances. Of the methods tested (dry brushing, vacuum cleaning, water washing, strippable coatings, and mechanical grinding), the most practical seems to be water washing. Effectiveness is very high, and it is very easy and rapid to deploy. The amount of wastewater produced (2 L/m2) would be substantial and may not be easy to manage, but the method is the clear winner from a usability perspective. Removable surface contamination levels (smear results) from the strippable coating and water washing coupons found no residual removable contamination. Thus, whatever is left is likely adhered to (or trapped within) the salt. The other option that shows promise is the use of a fixative barrier. Bartlett Nuclear, Inc.’s Polymeric Barrier System (PBS) proved the most durable of the coatings tested. The coatings were not tested for contaminant entrapment, only for coating integrity and durability.

  13. CALiPER Testing Laboratories

    Broader source: Energy.gov [DOE]

    CALiPER is not a testing laboratory or an accreditation organization. DOE established the CALiPER program to provide accurate and comparable data on LED products by arranging for reliable independent testing and data reporting of commercially available products. The CALiPER program established a process for qualifying testing laboratories to do this testing during the period when appropriate test standards such as LM-79 were under development and not yet covered by nationally recognized accreditation processes.

  14. Pompano subsea development -- Testing program

    SciTech Connect (OSTI)

    Nelson, R.; Berger, R.; Tyer, C.

    1996-12-31

    System reliability is essential for the economic success of any subsea oil and gas development. Testing programs can be developed to prove system reliability while still adhering to cost and schedule constraints. This paper describes a three-tiered equipment testing program that was employed for the Pompano Phase 2 subsea system. Program objectives, test descriptions, procedure development and test execution are discussed in detail. Lessons learned throughout the tests are also presented.

  15. ASC-ATDM Performance Portability Requirements for 2015-2019

    SciTech Connect (OSTI)

    Edwards, Harold C.; Trott, Christian Robert

    2015-03-01

    This report outlines the research, development, and support requirements for the Advanced Simulation and Computing (ASC ) Advanced Technology, Development, and Mitigation (ATDM) Performance Portability (a.k.a., Kokkos) project for 2015 - 2019 . The research and development (R&D) goal for Kokkos (v2) has been to create and demonstrate a thread - parallel programming model a nd standard C++ library - based implementation that enables performance portability across diverse manycore architectures such as multicore CPU, Intel Xeon Phi, and NVIDIA Kepler GPU. This R&D goal has been achieved for algorithms that use data parallel pat terns including parallel - for, parallel - reduce, and parallel - scan. Current R&D is focusing on hierarchical parallel patterns such as a directed acyclic graph (DAG) of asynchronous tasks where each task contain s nested data parallel algorithms. This five y ear plan includes R&D required to f ully and performance portably exploit thread parallelism across current and anticipated next generation platforms (NGP). The Kokkos library is being evaluated by many projects exploring algorithm s and code design for NGP. Some production libraries and applications such as Trilinos and LAMMPS have already committed to Kokkos as their foundation for manycore parallelism an d performance portability. These five year requirements includes support required for current and antic ipated ASC projects to be effective and productive in their use of Kokkos on NGP. The greatest risk to the success of Kokkos and ASC projects relying upon Kokkos is a lack of staffing resources to support Kokkos to the degree needed by these ASC projects. This support includes up - to - date tutorials, documentation, multi - platform (hardware and software stack) testing, minor feature enhancements, thread - scalable algorithm consulting, and managing collaborative R&D.

  16. PREPARING FOR EXASCALE: ORNL Leadership Computing Application Requirements and Strategy

    SciTech Connect (OSTI)

    Joubert, Wayne; Kothe, Douglas B; Nam, Hai Ah

    2009-12-01

    In 2009 the Oak Ridge Leadership Computing Facility (OLCF), a U.S. Department of Energy (DOE) facility at the Oak Ridge National Laboratory (ORNL) National Center for Computational Sciences (NCCS), elicited petascale computational science requirements from leading computational scientists in the international science community. This effort targeted science teams whose projects received large computer allocation awards on OLCF systems. A clear finding of this process was that in order to reach their science goals over the next several years, multiple projects will require computational resources in excess of an order of magnitude more powerful than those currently available. Additionally, for the longer term, next-generation science will require computing platforms of exascale capability in order to reach DOE science objectives over the next decade. It is generally recognized that achieving exascale in the proposed time frame will require disruptive changes in computer hardware and software. Processor hardware will become necessarily heterogeneous and will include accelerator technologies. Software must undergo the concomitant changes needed to extract the available performance from this heterogeneous hardware. This disruption portends to be substantial, not unlike the change to the message passing paradigm in the computational science community over 20 years ago. Since technological disruptions take time to assimilate, we must aggressively embark on this course of change now, to insure that science applications and their underlying programming models are mature and ready when exascale computing arrives. This includes initiation of application readiness efforts to adapt existing codes to heterogeneous architectures, support of relevant software tools, and procurement of next-generation hardware testbeds for porting and testing codes. The 2009 OLCF requirements process identified numerous actions necessary to meet this challenge: (1) Hardware capabilities must be advanced on multiple fronts, including peak flops, node memory capacity, interconnect latency, interconnect bandwidth, and memory bandwidth. (2) Effective parallel programming interfaces must be developed to exploit the power of emerging hardware. (3) Science application teams must now begin to adapt and reformulate application codes to the new hardware and software, typified by hierarchical and disparate layers of compute, memory and concurrency. (4) Algorithm research must be realigned to exploit this hierarchy. (5) When possible, mathematical libraries must be used to encapsulate the required operations in an efficient and useful way. (6) Software tools must be developed to make the new hardware more usable. (7) Science application software must be improved to cope with the increasing complexity of computing systems. (8) Data management efforts must be readied for the larger quantities of data generated by larger, more accurate science models. Requirements elicitation, analysis, validation, and management comprise a difficult and inexact process, particularly in periods of technological change. Nonetheless, the OLCF requirements modeling process is becoming increasingly quantitative and actionable, as the process becomes more developed and mature, and the process this year has identified clear and concrete steps to be taken. This report discloses (1) the fundamental science case driving the need for the next generation of computer hardware, (2) application usage trends that illustrate the science need, (3) application performance characteristics that drive the need for increased hardware capabilities, (4) resource and process requirements that make the development and deployment of science applications on next-generation hardware successful, and (5) summary recommendations for the required next steps within the computer and computational science communities.

  17. ENGINEERING TEST REACTOR

    DOE Patents [OSTI]

    De Boisblanc, D.R.; Thomas, M.E.; Jones, R.M.; Hanson, G.H.

    1958-10-21

    Heterogeneous reactors of the type which is both cooled and moderated by the same fluid, preferably water, and employs highly enriched fuel are reported. In this design, an inner pressure vessel is located within a main outer pressure vessel. The reactor core and its surrounding reflector are disposed in the inner pressure vessel which in turn is surrounded by a thermal shield, Coolant fluid enters the main pressure vessel, fiows downward into the inner vessel where it passes through the core containing tbe fissionable fuel assemblies and control rods, through the reflector, thence out through the bottom of the inner vessel and up past the thermal shield to the discharge port in the main vessel. The fuel assemblles are arranged in the core in the form of a cross having an opening extending therethrough to serve as a high fast flux test facility.

  18. Infrared source test

    SciTech Connect (OSTI)

    Ott, L.

    1994-11-15

    The purpose of the Infrared Source Test (IRST) is to demonstrate the ability to track a ground target with an infrared sensor from an airplane. The system is being developed within the Advance Technology Program`s Theater Missile Defense/Unmanned Aerial Vehicle (UAV) section. The IRST payload consists of an Amber Radiance 1 infrared camera system, a computer, a gimbaled mirror, and a hard disk. The processor is a custom R3000 CPU board made by Risq Modular Systems, Inc. for LLNL. The board has ethernet, SCSI, parallel I/O, and serial ports, a DMA channel, a video (frame buffer) interface, and eight MBytes of main memory. The real-time operating system VxWorks has been ported to the processor. The application code is written in C on a host SUN 4 UNIX workstation. The IRST is the result of a combined effort by physicists, electrical and mechanical engineers, and computer scientists.

  19. New treatability tests

    SciTech Connect (OSTI)

    Roy, K.A.

    1993-01-01

    EPA, under its Superfund Innovative Technology Evaluation (SITE) program, recently announced results from treatability tests on Thorneco Inc.'s (Payson, Ariz.) Enzyme-Activated Cellulose Technology. The technology relies on cellulose coated with a proprietary enzyme to remove metals and organic compounds from aqueous solutions. Following enzyme treatment, cellulose is placed in one or more towers that operate in series. Contaminated water enters the towers from the bottom and flows upward through the enzyme-activated cellulose to a discharge pipe at the top. The technology can remove metals and organic compounds from aqueous solutions in the form of ions, particulates or colloidal compounds. The treatability study was conducted between Aug. 26 and Sept. 30, 1991, at the Engineering Science treatability lab in Atlanta. Contaminated groundwater came from Stream A at the Stringfellow Superfund site in Glen Avon, Calif. A bench-scale treatability study was performed because of a lack of complete background data and uncertainty concerning the technology's removal mechanisms.

  20. Wind Technology Testing Center Acquires New Blade Fatigue Test System |

    Energy Savers [EERE]

    Department of Energy Technology Testing Center Acquires New Blade Fatigue Test System Wind Technology Testing Center Acquires New Blade Fatigue Test System August 1, 2013 - 4:33pm Addthis This is an excerpt from the Second Quarter 2013 edition of the Wind Program R&D Newsletter. The Wind Technology Testing Center (WTTC) in Boston, Massachusetts, recently acquired a significant piece of testing equipment needed to offer its industry partners a full state-of-the-art suite of wind turbine

  1. FY 1998 waste information requirements document

    SciTech Connect (OSTI)

    Poppiti, J.A.

    1997-09-05

    The Waste Information Requirements Document describes the activities of the Tank Waste Remediation System (TWRS) Characterization Project that provide characterization information on Hanford Site waste tanks. The characterization information is required to perform operations and meet the commitments of TWRS end users. These commitments are derived from the Hanford Federal Facility Agreement and Consent Order, also known as the Tri-Party Agreement; the Recommendation 93-5 Implementation Plan to the Defense Nuclear Facilities Safety Board (DNFSB); and other directives as listed in Section 4.0. This Waste Information Requirement Document applies to Fiscal Years 1997 and 1998 activities. Its contents are based on the best information available in August 1997. The format and content are based on the directions of DOE-RL (Sieracki, 1997) and Fluor Daniel Hanford Incorporated (Umek, 1997). Activities, such as the revision of the Tank Characterization Technical Sampling Basis (Brown et al. 1997), the revision of the data quality objectives (DQOs), issue closures, discussions with Ecology, and management decisions may cause subsequent updates to the Waste Information Requirements Document.

  2. Part B - Requirements & Funding Information PART B - Requirements and Funding Information

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    a. Part B 1 Part B - Requirements & Funding Information PART B - Requirements and Funding Information Gray highlights are instructions. Remove the instructions from the interagency agreement. Attachment 3.a. Part B 2 PART B - Requirements & Funding Information B.1. Purpose This is for an assisted acquisition. An assisted acquisition is a type of interagency acquisition where the servicing agency and requesting agency enter into a written interagency agreement pursuant to which the

  3. Small passenger car transmission test: Chevrolet Luv transmission

    SciTech Connect (OSTI)

    Bujold, M.P.

    1980-06-01

    The small passenger car transmission test was initiated to supply electric vehicle manufacturers with technical information regarding the performance of commercially available transmissions. This information would enable EV manufacturers to design a more energy efficient vehicle. With this information the manufacturers would be able to estimate vehicle driving range as well as speed and torque requirements for specific roadload performance characteristics. This report covers the 1978 Chevrolet Luv Truck manual transmission. This transmission was tested per a passenger car automatic transmission test code (SAE J65lb) which required drive performance, coast performance, and no load test conditions. The portion of the test code which involved the throttle valve modulation and line pressure were deleted since they did not apply to the manual transmission. Under these test conditions the transmission attained maximum efficiencies in the upper 90% range at rated load for both drive performance tests and coast performance tests. The major results of this test are the torque speed and efficiency curves which are located in the data section of this report. These graphs map the complete performance characteristics for the Chevrolet Luv Truck Manual transmission. This information will facilitate the vehicle manufacturer in the design of a more energy efficient vehicle.

  4. Waste retrieval sluicing system data acquisition system acceptance test report

    SciTech Connect (OSTI)

    Bevins, R.R.

    1998-07-31

    This document describes the test procedure for the Project W-320 Tank C-106 Sluicing Data Acquisition System (W-320 DAS). The Software Test portion will test items identified in the WRSS DAS System Description (SD), HNF-2115. Traceability to HNF-2115 will be via a reference that follows in parenthesis, after the test section title. The Field Test portion will test sensor operability, analog to digital conversion, and alarm setpoints for field instrumentation. The W-320 DAS supplies data to assist thermal modeling of tanks 241-C-106 and 241-AY-102. It is designed to be a central repository for information from sources that would otherwise have to be read, recorded, and integrated manually. Thus, completion of the DAS requires communication with several different data collection devices and output to a usable PC data formats. This test procedure will demonstrate that the DAS functions as required by the project requirements stated in Section 3 of the W-320 DAS System Description, HNF-2115.

  5. BALLISTICS TESTING OF THE 9977 SHIPPING PACKAGE FOR STORAGE APPLICATIONS

    SciTech Connect (OSTI)

    Loftin, B.; Abramczyk, G.; Koenig, R.

    2012-06-06

    Radioactive materials are stored in a variety of locations throughout the DOE complex. At the Savannah River Site (SRS), materials are stored within dedicated facilities. Each of those facilities has a documented safety analysis (DSA) that describes accidents that the facility and the materials within it may encounter. Facilities at the SRS are planning on utilizing the certified Model 9977 Shipping Package as a long term storage package and one of these facilities required ballistics testing. Specifically, in order to meet the facility DSA, the radioactive materials (RAM) must be contained within the storage package after impact by a .223 caliber round. In order to qualify the Model 9977 Shipping Package for storage in this location, the package had to be tested under these conditions. Over the past two years, the Model 9977 Shipping Package has been subjected to a series of ballistics tests. The purpose of the testing was to determine if the 9977 would be suitable for use as a storage package at a Savannah River Site facility. The facility requirements are that the package must not release any of its contents following the impact in its most vulnerable location by a .223 caliber round. A package, assembled to meet all of the design requirements for a certified 9977 shipping configuration and using simulated contents, was tested at the Savannah River Site in March of 2011. The testing was completed and the package was examined. The results of the testing and examination are presented in this paper.

  6. RELAP5-3D Restart and Backup Verification Testing

    SciTech Connect (OSTI)

    Dr. George L Mesina

    2013-09-01

    Existing testing methodology for RELAP5-3D employs a set of test cases collected over two decades to test a variety of code features and run on a Linux or Windows platform. However, this set has numerous deficiencies in terms of code coverage, detail of comparison, running time, and testing fidelity of RELAP5-3D restart and backup capabilities. The test suite covers less than three quarters of the lines of code in the relap directory and just over half those in the environmental library. Even in terms of code features, many are not covered. Moreover, the test set runs many problems long past the point necessary to test the relevant features. It requires standard problems to run to completion. This is unnecessary for features can be tested in a short-running problem. For example, many trips and controls can be tested in the first few time steps, as can a number of fluid flow options. The testing system is also inaccurate. For the past decade, the diffem script has been the primary tool for checking that printouts from two different RELAP5-3D executables agree. This tool compares two output files to verify that all characters are the same except for those relating to date, time and a few other excluded items. The variable values printed on the output file are accurate to no more than eight decimal places. Therefore, calculations with errors in decimal places beyond those printed remain undetected. Finally, fidelity of restart is not tested except in the PVM sub-suite and backup is not specifically tested at all. When a restart is made from any midway point of the base-case transient, the restart must produce the same values. When a backup condition occurs, the code repeats advancements with the same time step. A perfect backup can be tested by forcing RELAP5 to perform a backup by falsely setting a backup condition flag at a user-specified-time. Comparison of the calculations of that run and those produced by the same input w/o the spurious condition should be identical. Backup testing is more difficult the other kinds of testing described above because it requires additional coding to implement. The testing system constructed and described in this document resolves all of these issues. A matrix of test features and short-running cases that exercise them is presented. A small information file that contains sufficient data to verify calculations to the last decimal place and bit is produced. This testing system is used to test base cases (called null testing) as well as restart and backup cases. The programming that implements these new capabilities is presented.

  7. DSA torque test robot

    SciTech Connect (OSTI)

    McMillan, D.E.

    1990-11-01

    A rotary solenoid used in the Dual Strong-Link Assembly (DSA) has a housing diameter of 0.67 inches, and overall length of approximately 1.37 inches. The rotor and housing each have four poles. When the coil is energized and the shaft is rotated, magnetic torque is produced which completes four nominally identical cycles during each revolution of the shaft. At zero and 90 degrees of shaft rotation, the poles are aligned and the rotor is stable. The mid-point between poles is unstable; any displacement produces a torque toward one of the stable points. A torque measurement is performed on each solenoid produced. The measurement technique used previously was labor intensive and required that analog torque plots be manually interpreted to determine compliance with the torque specification. This paper describes a robotically assisted torque measurement system that was developed and placed into production. This system reduces cycle time from approximately 6 minutes per part to a little more than 1 minute per part.

  8. Organic Separation Test Results

    SciTech Connect (OSTI)

    Russell, Renee L.; Rinehart, Donald E.; Peterson, Reid A.

    2014-09-22

    Separable organics have been defined as “those organic compounds of very limited solubility in the bulk waste and that can form a separate liquid phase or layer” (Smalley and Nguyen 2013), and result from three main solvent extraction processes: U Plant Uranium Recovery Process, B Plant Waste Fractionation Process, and Plutonium Uranium Extraction (PUREX) Process. The primary organic solvents associated with tank solids are TBP, D2EHPA, and NPH. There is concern that, while this organic material is bound to the sludge particles as it is stored in the tanks, waste feed delivery activities, specifically transfer pump and mixer pump operations, could cause the organics to form a separated layer in the tank farms feed tank. Therefore, Washington River Protection Solutions (WRPS) is experimentally evaluating the potential of organic solvents separating from the tank solids (sludge) during waste feed delivery activities, specifically the waste mixing and transfer processes. Given the Hanford Tank Waste Treatment and Immobilization Plant (WTP) waste acceptance criteria per the Waste Feed Acceptance Criteria document (24590-WTP-RPT-MGT-11-014) that there is to be “no visible layer” of separable organics in the waste feed, this would result in the batch being unacceptable to transfer to WTP. This study is of particular importance to WRPS because of these WTP requirements.

  9. FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting

    Energy Savers [EERE]

    Requirement | Department of Energy Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement PDF icon FY 2013 DARM Transmittal Letter and Attachment Final.pdf More Documents & Publications FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY_09_DM_RM_AM_Reporting_Memo_and_attachment_072009.pdf Real Property Maintenance Reporting Requirement

  10. Ambient Corporation's response to NBP RFI: Communications Requirements...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ambient Corporation's response to NBP RFI: Communications Requirements Ambient Corporation's response to NBP RFI: Communications Requirements Ambient Corporation's comments on ...

  11. Test report for initial test of 6266 Building filter assemblies

    SciTech Connect (OSTI)

    Prather, M.C.

    1994-08-01

    This is the test report for the initial test of the Waste Sampling and Characterization Facility (WSCF) 6266 Building high efficiency particulate air (HEPA) filter assemblies. This supports the start-up of WSCF.

  12. Test Proposal Document for Phased Field Thermal Testing in Salt |

    Energy Savers [EERE]

    Department of Energy Strategic Plan - February 2012 Test Methods Standing Technical Committee Strategic Plan - February 2012 This document outlines gaps, needs, and opportunities identified by the Building America Standing Technical Committee on Test Methods. PDF icon strategic_plan_test_methods.pdf More Documents & Publications Test Methods Standing Technical Committee Presentation Standing Technical Committee Working Sessions Analysis Methods and Tools Standing Technical Committee

  13. Massive Hanford Test Reactor Removed - Plutonium Recycle Test Reactor

    Office of Environmental Management (EM)

    removed from Hanford's 300 Area | Department of Energy Massive Hanford Test Reactor Removed - Plutonium Recycle Test Reactor removed from Hanford's 300 Area Massive Hanford Test Reactor Removed - Plutonium Recycle Test Reactor removed from Hanford's 300 Area January 22, 2014 - 12:00pm Addthis Media Contacts Cameron Hardy, DOE 509-376-5365 Cameron.Hardy@re.doe.gov Mark McKenna, Washington Closure 509-372-9032 media@wch-rcc.com RICHLAND, WA - Hanford's River Corridor contractor, Washington

  14. Accelerated Stress Testing, Qualification Testing, HAST, Field Experience |

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy presentation, which was the opening session of the NREL 2013 Photovoltaic Module Reliability Workshop held on February 26, 2013 in Golden, CO, was presented by John Wohlgemuth. Entitled "Accelerated Stress Testing, Qualification Testing, HAST, Field Experience -- What Do They All Mean?" the presentation details efforts to develop accelerated stress tests beyond the qualification test levels, which are necessary to predict PV module wear-out. The commercial

  15. DOE Challenge Home, California Program Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Challenge Home, California Program Requirements DOE Challenge Home, California Program Requirements DOE Challenge Home, California Program Requirements, as posted on the U.S. Department of Energy's DOE Challenge Home website. PDF icon ch_california_requirements2013.pdf More Documents & Publications Washington DOE ZERH Program Requirements DOE Zero Energy Ready Home National Program Requirements (Rev. 04) California DOE ZERH Program Requiremets

  16. Advanced Vehicle Testing and Evaluation

    SciTech Connect (OSTI)

    Garetson, Thomas

    2013-03-31

    The objective of the United States (U.S.) Department of Energy's (DOEs) Advanced Vehicle Testing and Evaluation (AVTE) project was to provide test and evaluation services for advanced technology vehicles, to establish a performance baseline, to determine vehicle reliability, and to evaluate vehicle operating costs in fleet operations.Vehicles tested include light and medium-duty vehicles in conventional, hybrid, and all-electric configurations using conventional and alternative fuels, including hydrogen in internal combustion engines. Vehicles were tested on closed tracks and chassis dynamometers, as well as operated on public roads, in fleet operations, and over prescribed routes. All testing was controlled by procedures developed specifically to support such testing.

  17. Nevada Test Site Environmental Report 2008 Summary

    SciTech Connect (OSTI)

    Cathy A. Wills

    2009-09-01

    The Nevada Test Site Environmental Report (NTSER) 2008 was prepared to meet the information needs of the public and the requirements and guidelines of the U.S. Department of Energy (DOE) for annual site environmental reports. It was prepared by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This and previous years’ NTSERs are posted on the NNSA/NSO website at http://www.nv.doe.gov/library/publications/aser.aspx.

  18. Nevada Test Site Radiation Protection Program

    SciTech Connect (OSTI)

    Radiological Control Managers' Council, Nevada Test Site

    2007-08-09

    Title 10 Code of Federal Regulations (CFR) 835, 'Occupational Radiation Protection', establishes radiation protection standards, limits, and program requirements for protecting individuals from ionizing radiation resulting from the conduct of U.S. Department of Energy (DOE) activities. 10 CFR 835.101(a) mandates that DOE activities be conducted in compliance with a documented Radiation Protection Program (RPP) as approved by DOE. This document promulgates the RPP for the Nevada Test Site (NTS), related (onsite or offsite) DOE National Nuclear Security Administration Nevada Site Office (NNSA/NSO) operations, and environmental restoration offsite projects.

  19. Nevada Test Site Environmental Report 2008

    SciTech Connect (OSTI)

    Cathy A. Wills

    2009-09-01

    The Nevada Test Site Environmental Report (NTSER) 2008 was prepared to meet the information needs of the public and the requirements and guidelines of the U.S. Department of Energy (DOE) for annual site environmental reports. It was prepared by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This and previous years’ NTSERs are posted on the NNSA/NSO website at http://www.nv.doe.gov/library/publications/aser.aspx.

  20. Tonopah Test Range 2030 Meeting Summary Report

    SciTech Connect (OSTI)

    NSTec Environmental Restoration

    2009-04-01

    Corrective Action Sites (CASs) and Corrective Action Units (CAUs) at the Tonopah Test Range (TTR) may be placed into three categories: Closed, Closed in Place, or Closure in Progress. CASs and CAUs where contaminants were either not detected or were cleaned up to within regulatory action levels are summarized. CASs and CAUs where contaminants and/or waste have been closed in place are summarized. There is also a table that summarizes the contaminant that has been closed at each site, if land-use restrictions are present, and if post-closure inspections are required.