Powered by Deep Web Technologies
Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

An IEEE 1588 performance testing dashboard for power industry requirements  

Science Conference Proceedings (OSTI)

The numerous time synchronization performance requirements in the Smart Grid necessitate a set of common metrics and test methods. The test methods help to verify the ability of the network system and its components to meet the power industry's accuracy, ... Keywords: IEEE 1588, PMU, conformance testing, test methods, time synchronization

Julien Amelot; Jeffrey Fletcher; Ya-Shian Li-Baboud; Dhananjay Anand; Clement Vasseur; James Moyne

2012-03-01T23:59:59.000Z

2

Design requirements for the supercritical water oxidation test bed  

SciTech Connect

This report describes the design requirements for the supercritical water oxidation (SCWO) test bed that will be located at the Idaho National Engineering Laboratory (INEL). The test bed will process a maximum of 50 gph of waste plus the required volume of cooling water. The test bed will evaluate the performance of a number of SCWO reactor designs. The goal of the project is to select a reactor that can be scaled up for use in a full-size waste treatment facility to process US Department of Energy mixed wastes. EG&G Idaho, Inc. will design and construct the SCWO test bed at the Water Reactor Research Test Facility (WRRTF), located in the northern region of the INEL. Private industry partners will develop and provide SCWO reactors to interface with the test bed. A number of reactor designs will be tested, including a transpiring wall, tube, and vessel-type reactor. The initial SCWO reactor evaluated will be a transpiring wall design. This design requirements report identifies parameters needed to proceed with preliminary and final design work for the SCWO test bed. A flow sheet and Process and Instrumentation Diagrams define the overall process and conditions of service and delineate equipment, piping, and instrumentation sizes and configuration Codes and standards that govern the safe engineering and design of systems and guidance that locates and interfaces test bed hardware are provided. Detailed technical requirements are addressed for design of piping, valves, instrumentation and control, vessels, tanks, pumps, electrical systems, and structural steel. The approach for conducting the preliminary and final designs and environmental and quality issues influencing the design are provided.

Svoboda, J.M.; Valentich, D.J.

1994-05-01T23:59:59.000Z

3

An assessment of testing requirement impacts on nuclear thermal propulsion ground test facility design  

SciTech Connect

Programs to develop solid core nuclear thermal propulsion (NTP) systems have been under way at the Department of Defense (DoD), the National Aeronautics and Space Administration (NASA), and the Department of Energy (DOE). These programs have recognized the need for a new ground test facility to support development of NTP systems. However, the different military and civilian applications have led to different ground test facility requirements. The Department of Energy (DOE) in its role as landlord and operator of the proposed research reactor test facilities has initiated an effort to explore opportunities for a common ground test facility to meet both DoD and NASA needs. The baseline design and operating limits of the proposed DoD NTP ground test facility are described. The NASA ground test facility requirements are reviewed and their potential impact on the DoD facility baseline is discussed.

Shipers, L.R.; Ottinger, C.A.; Sanchez, L.C.

1993-10-25T23:59:59.000Z

4

10-MWe pilot-plant-receiver panel test requirements document solar thermal test facility  

DOE Green Energy (OSTI)

Testing plans for a full-scale test receiver panel and supporting hardware which essentially duplicate both physically and functionally, the design planned for the Barstow Solar Pilot Plant are presented. Testing is to include operation during normal start and shutdown, intermittent cloud conditions, and emergencies to determine the panel's transient and steady state operating characteristics and performance under conditions equal to or exceeding those expected in the pilot plant. The effects of variations of input and output conditions on receiver operation are also to be investigated. Test hardware are described, including the pilot plant receiver, the test receiver assembly, receiver panel, flow control, electrical control and instrumentation, and structural assembly. Requirements for the Solar Thermal Test Facility for the tests are given. The safety of the system is briefly discussed, and procedures are described for assembly, installation, checkout, normal and abnormal operations, maintenance, removal and disposition. Also briefly discussed are quality assurance, contract responsibilities, and test documentation. (LEW)

Not Available

1978-08-25T23:59:59.000Z

5

Derived Test Requirements for FIPS PUB 140-2, Security ...  

Science Conference Proceedings (OSTI)

... DC or DC-to-DC modules), transformers, input power ... cryptographic module is in a self-test condition. ... verify that the self-test conditions specified in ...

2011-10-19T23:59:59.000Z

6

10-MWe pilot-plant-receiver-panel test-requirements document: Solar Thermal Test Facility  

DOE Green Energy (OSTI)

Plans are presented for insolation testing of a full-scale test receiver panel and supporting hardware which essentially duplicate both physically and functionally the design planned for the 10 MWe pilot plant. Testing includes operation during normal start and shutdown, intermittent cloud conditions, and emergencies to determine the transient and steady state operating characteristics and performance under conditions equal to or exceeding those expected in the pilot plant. The effects of variations of input and output conditions on receiver operation are also to be investigated. A brief description of the pilot plant receiver subsystem is presented, followed by a detailed description of the receiver assembly to be tested at the Solar Thermal Test Facility. Major subassemblies are described, including the receiver panel, flow control, electrical control and instrumentation, and the structural assembly. Requirements of the Solar Thermal Test Facility for the tests are given. System safety measures are described. The tests, operating conditions, and expected results are presented. Quality assurance, task responsibilities, and test documentation are also discussed. (LEW)

Not Available

1978-06-10T23:59:59.000Z

7

Vehicle Infrastructure Connectivity and Communications -- Requirements and Testing  

Science Conference Proceedings (OSTI)

It is expected that consumers will charge electric vehicles in a variety of locations under varying weather conditions. In order to ensure that charging can be safely carried out in conditions that may include moisture, rain, and snow, the National Electric Code (NEC) requires that certain safety features be provided for as part of plug-in electric vehicle (PEV) charging equipment. While the NEC defines electric vehicle supply equipment (EVSE) more broadly, the term EVSE is commonly used to refer only to...

2011-12-30T23:59:59.000Z

8

Testing site size requirements in chemisorption: experiment and theory  

DOE Green Energy (OSTI)

''Ensemble requirements'' in surface chemistry refer to the number and shape of contiguous empty sites necessary for chemisorption of a particular molecule. Ensemble effects can play a major role in directing the course of surface reactions, leading, for example, to dramatic changes in catalytic selectivity when the active metal component is diluted upon alloying with an inert metal. We will review here fundamental surface science studies that have attempted to probe this site size requirement by diluting active sites on a single crystal surface with an inert metal overlayer. We will emphasize recent results in our lab on the interaction of simple molecules (CO, H/sub 2/, O/sub 2/) with Cu-, Ag-, and Bi-dosed Pt(111). Theoretical models based upon Monte-Carlo simulations will be summarized which, when compared to such data, allow more accurate determination of ensemble sizes. These models predict uptake curves that deviate strongly from the commonly used (1-theta)/sup A/ law (A = number of sites in ensemble), which is valid only for an array of isolated ensembles. 32 refs., 3 figs.

Campbell, C.T.; Paffett, M.T.; Voter, A.F.

1985-01-01T23:59:59.000Z

9

Test requirements  

lower than theory. Water: 15 to 70% less than theoretical ... SRNL is managed and operated for the U.S. Department of Energy by Savannah River Nuclear Solutions, LLC.

10

Test blanket modules in ITER: An overview on proposed designs and required DEMO-relevant materials  

E-Print Network (OSTI)

Test blanket modules in ITER: An overview on proposed designs and required DEMO-relevant materials, Russian Federation Abstract Within the framework of the ITER Test Blanket Working Group, the ITER Parties have made several proposals for test blanket modules to be tested in ITER from the first day of H

Abdou, Mohamed

11

What are the requirements for duct leakage testing? | Building Energy Codes  

NLE Websites -- All DOE Office Websites (Extended Search)

requirements for duct leakage testing? requirements for duct leakage testing? Both the 2009 and 2012 IECC require duct tightness to be verified. Verification can take place via either a post-construction test or a rough-in test. For the post-construction test, leakage measurement must be made across the entire system, including the manufacturer's air handler enclosure, with all register boots taped or sealed at a test pressure of 0.1 inches w.g. (25 Pa). The 2009 IECC limits the leakage to outdoors to less than or equal to 8 cfm per 100 ft2 of conditioned floor area or total leakage less than or equal to 12 cfm per 100 ft2 of conditioned floor area. The 2012 IECC only contains a requirement for total leakage of less than or equal to 4 cfm per 100 ft2 of conditioned floor area. For the rough-in test, leakage measurement is made across the system, with

12

Overview of Component Testing Requirements for a Small Fluoride Salt-Cooled High Tempreature Reactor  

Science Conference Proceedings (OSTI)

This article summarizes the information necessary to provide reasonable assurance that components for a small fluoride salt-cooled high temperature reactor will meet their functional requirements. In support of the analysis of testing requirements, a simplified, conceptual description of the systems, structures, and components specific to this reactor class was developed. These reactor system elements were divided into major categories based on their functions: (1) reactor core systems, (2) heat transport system, (3) reactor auxiliary cooling system, and (4) instrumentation and controls system. An assessment of technical maturity for each element was made, and a gap analysis was performed to identify specific areas that require further testing. A prioritized list of the testing requirements was then developed. The prioritization was based on both the relative importance of the system to reactor viability, and performance and time requirements to perform the testing.

Cetiner, Mustafa Sacit [ORNL; Holcomb, David Eugene [ORNL; Flanagan, George F [ORNL; Peretz, Fred J [ORNL; Yoder Jr, Graydon L [ORNL

2010-01-01T23:59:59.000Z

13

Interoperability requirements for a South African joint command and control test facility  

Science Conference Proceedings (OSTI)

The South African National Defence Force is in the process of establishing a Joint Command and Control Test Facility at a National Research Institute. The goal with this facility is to provide an integrated environment for Joint Command and Control doctrine ... Keywords: architectures, interoperability requirements, joint command & control, service-orientated architectures, test facility

Willem H. le Roux

2008-06-01T23:59:59.000Z

14

An Analysis of Testing Requirements for Fluoride Salt Cooled High Temperature Reactor Components  

SciTech Connect

This report provides guidance on the component testing necessary during the next phase of fluoride salt-cooled high temperature reactor (FHR) development. In particular, the report identifies and describes the reactor component performance and reliability requirements, provides an overview of what information is necessary to provide assurance that components will adequately achieve the requirements, and then provides guidance on how the required performance information can efficiently be obtained. The report includes a system description of a representative test scale FHR reactor. The reactor parameters presented in this report should only be considered as placeholder values until an FHR test scale reactor design is completed. The report focus is bounded at the interface between and the reactor primary coolant salt and the fuel and the gas supply and return to the Brayton cycle power conversion system. The analysis is limited to component level testing and does not address system level testing issues. Further, the report is oriented as a bottom-up testing requirements analysis as opposed to a having a top-down facility description focus.

Holcomb, David Eugene [ORNL; Cetiner, Mustafa Sacit [ORNL; Flanagan, George F [ORNL; Peretz, Fred J [ORNL; Yoder Jr, Graydon L [ORNL

2009-11-01T23:59:59.000Z

15

Lead Coolant Test Facility Technical and Functional Requirements, Conceptual Design, Cost and Construction Schedule  

Science Conference Proceedings (OSTI)

This report presents preliminary technical and functional requirements (T&FR), thermal hydraulic design and cost estimate for a lead coolant test facility. The purpose of this small scale facility is to simulate lead coolant fast reactor (LFR) coolant flow in an open lattice geometry core using seven electrical rods and liquid lead or lead-bismuth eutectic. Based on review of current world lead or lead-bismuth test facilities and research need listed in the Generation IV Roadmap, five broad areas of requirements of basis are identified: Develop and Demonstrate Prototype Lead/Lead-Bismuth Liquid Metal Flow Loop Develop and Demonstrate Feasibility of Submerged Heat Exchanger Develop and Demonstrate Open-lattice Flow in Electrically Heated Core Develop and Demonstrate Chemistry Control Demonstrate Safe Operation and Provision for Future Testing. These five broad areas are divided into twenty-one (21) specific requirements ranging from coolant temperature to design lifetime. An overview of project engineering requirements, design requirements, QA and environmental requirements are also presented. The purpose of this T&FRs is to focus the lead fast reactor community domestically on the requirements for the next unique state of the art test facility. The facility thermal hydraulic design is based on the maximum simulated core power using seven electrical heater rods of 420 kW; average linear heat generation rate of 300 W/cm. The core inlet temperature for liquid lead or Pb/Bi eutectic is 420oC. The design includes approximately seventy-five data measurements such as pressure, temperature, and flow rates. The preliminary estimated cost of construction of the facility is $3.7M. It is also estimated that the facility will require two years to be constructed and ready for operation.

Soli T. Khericha

2006-09-01T23:59:59.000Z

16

Using acceptance tests as a support for clarifying requirements: A series of experiments  

Science Conference Proceedings (OSTI)

One of the main reasons for the failure of many software projects is the late discovery of a mismatch between the customers' expectations and the pieces of functionality implemented in the delivered system. At the root of such a mismatch is often a set ... Keywords: Acceptance testing, Empirical studies, Fit tables, Requirements

Filippo Ricca; Marco Torchiano; Massimiliano Di Penta; Mariano Ceccato; Paolo Tonella

2009-02-01T23:59:59.000Z

17

Test Requirements and Conceptual Design for a Potassium Test Loop to Support an Advanced Potassium Rankine Cycle Power Conversion Systems  

SciTech Connect

Parameters for continuing the design and specification of an experimental potassium test loop are identified in this report. Design and construction of a potassium test loop is part of the Phase II effort of the project ''Technology Development Program for an Advanced Potassium Rankine Power Conversion System''. This program is supported by the National Aeronautics and Space Administration. Design features for the potassium test loop and its instrumentation system, specific test articles, and engineered barriers for ensuring worker safety and protection of the environment are described along with safety and environmental protection requirements to be used during the design process. Information presented in the first portion of this report formed the basis to initiate the design phase of the program; however, the report is a living document that can be changed as necessary during the design process, reflecting modifications as additional design details are developed. Some portions of the report have parameters identified as ''to be determined'' (TBD), reflecting the early stage of the overall process. In cases where specific design values are presently unknown, the report attempts to document the quantities that remain to be defined in order to complete the design of the potassium test loop and supporting equipment.

Yoder, JR.G.L.

2006-03-08T23:59:59.000Z

18

Technical requirements for the actinide source-term waste test program  

SciTech Connect

This document defines the technical requirements for a test program designed to measure time-dependent concentrations of actinide elements from contact-handled transuranic (CH TRU) waste immersed in brines similar to those found in the underground workings of the Waste Isolation Pilot Plant (WIPP). This test program wig determine the influences of TRU waste constituents on the concentrations of dissolved and suspended actinides relevant to the performance of the WIPP. These influences (which include pH, Eh, complexing agents, sorbent phases, and colloidal particles) can affect solubilities and colloidal mobilization of actinides. The test concept involves fully inundating several TRU waste types with simulated WIPP brines in sealed containers and monitoring the concentrations of actinide species in the leachate as a function of time. The results from this program will be used to test numeric models of actinide concentrations derived from laboratory studies. The model is required for WIPP performance assessment with respect to the Environmental Protection Agency`s 40 CFR Part 191B.

Phillips, M.L.F.; Molecke, M.A.

1993-10-01T23:59:59.000Z

19

Testing requirements for variable-speed generating technology for wind turbine applications. Final report  

Science Conference Proceedings (OSTI)

Guidelines for evaluating the impacts of integrating variable-speed, constant-frequency (VSCF) wind turbines into electric utility systems have been proposed based upon prior test experiences with the NASA VSCF system and the expected performance of the Westinghouse and OMNION VSCF systems. The NASA and Westinghouse VSCF generating systems use a wound rotor induction generator and a cycloconverter, while the OMNION system uses a wound rotor induction generator and a dc-current link converter. The design of VSCF/utility system interface requirements and test plans is based on utility system electrical issues such as utility system control and operation, protection, voltage/reactive power management, power quality, and reliability. A framework for testing VSCF concepts is proposed which includes a three stage process: modeling of the system to analyze design alternatives and simulate disturbances that could be harmful to the actual system; laboratory testing which involves the use of the system under controlled conditions; and field testing to collect data under actual conditions to validate models and analyze the wind turbine behavior.

Herrera, J.I.

1986-05-01T23:59:59.000Z

20

Meeting Human Reliability Requirements through Human Factors Design, Testing, and Modeling  

SciTech Connect

In the design of novel systems, it is important for the human factors engineer to work in parallel with the human reliability analyst to arrive at the safest achievable design that meets design team safety goals and certification or regulatory requirements. This paper introduces the System Development Safety Triptych, a checklist of considerations for the interplay of human factors and human reliability through design, testing, and modeling in product development. This paper also explores three phases of safe system development, corresponding to the conception, design, and implementation of a system.

R. L. Boring

2007-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Deriving In-Use PHEV Fuel Economy Predictions from Standardized Test Cycle Results: Preprint  

DOE Green Energy (OSTI)

Explores the issue of how to apply an adjustment method to raw plug-in hybrid vehicle dynamometer test results to better estimate PHEVs' in-use fuel and electricity consumption.

Gonder, J.; Brooker, A.; Carlson, R.; Smart, J.

2009-08-01T23:59:59.000Z

22

Deriving In-Use PHEV Fuel Economy Predictions from Standardized Test Cycle Results  

DOE Green Energy (OSTI)

Plug-in hybrid electric vehicles (PHEVs) have potential to reduce or eliminate the U.S. dependence on foreign oil. Quantifying the amount of petroleum each uses, however, is challenging. To estimate in-use fuel economy for conventional vehicles the Environmental Protection Agency (EPA) conducts chassis dynamometer tests on standard historic drive cycles and then adjusts the resulting “raw” fuel economy measurements downward. Various publications, such as the forthcoming update to the SAE J1711 recommended practice for PHEV fuel economy testing, address the challenges of applying standard test procedures to PHEVs. This paper explores the issue of how to apply an adjustment method to such “raw” PHEV dynamometer test results in order to more closely estimate the in-use fuel and electricity consumption characteristics of these vehicles. The paper discusses two possible adjustment methods, and evaluates one method by applying it to dynamometer data and comparing the result to in-use fleet data (on an aftermarket conversion PHEV). The paper will also present the methodologies used to collect the data needed for this comparison.

John Smart; Richard "Barney" Carlson; Jeff Gonder; Aaron Brooker

2009-09-01T23:59:59.000Z

23

Necessity and Requirements of a Collaborative Effort to Develop a Large Wind Turbine Blade Test Facility in North America  

DOE Green Energy (OSTI)

The wind power industry in North America has an immediate need for larger blade test facilities to ensure the survival of the industry. Blade testing is necessary to meet certification and investor requirements and is critical to achieving the reliability and blade life needed for the wind turbine industry to succeed. The U.S. Department of Energy's (DOE's) Wind Program is exploring options for collaborating with government, private, or academic entities in a partnership to build larger blade test facilities in North America capable of testing blades up to at least 70 m in length. The National Renewable Energy Laboratory (NREL) prepared this report for DOE to describe the immediate need to pursue larger blade test facilities in North America, categorize the numerous prospective partners for a North American collaboration, and document the requirements for a North American test facility.

Cotrell, J.; Musial, W.; Hughes, S.

2006-05-01T23:59:59.000Z

24

A New Bench Scale Test for Determining Energy Requirement of an ...  

Science Conference Proceedings (OSTI)

Symposium, Water and Energy in Mineral Processing ... For most green and brown field operations, the amount of feed required is quite prohibitive and often  ...

25

Short Sample Testing Facility for the Superconducting Super Collider: Requirements and Development Status  

E-Print Network (OSTI)

to be tested are inserted in the brass channel, separated by4ea) Instrumentation Boards (3 ea) Brass Channel Helium

Zbasnik, J.

2011-01-01T23:59:59.000Z

26

Tank Waste Remediation System tank waste pretreatment and vitrification process development testing requirements assessment  

Science Conference Proceedings (OSTI)

A multi-faceted study was initiated in November 1993 to provide assurance that needed testing capabilities, facilities, and support infrastructure (sampling systems, casks, transportation systems, permits, etc.) would be available when needed for process and equipment development to support pretreatment and vitrification facility design and construction schedules. This first major report provides a snapshot of the known testing needs for pretreatment, low-level waste (LLW) and high-level waste (HLW) vitrification, and documents the results of a series of preliminary studies and workshops to define the issues needing resolution by cold or hot testing. Identified in this report are more than 140 Hanford Site tank waste pretreatment and LLW/HLW vitrification technology issues that can only be resolved by testing. The report also broadly characterizes the level of testing needed to resolve each issue. A second report will provide a strategy(ies) for ensuring timely test capability. Later reports will assess the capabilities of existing facilities to support needed testing and will recommend siting of the tests together with needed facility and infrastructure upgrades or additions.

Howden, G.F.

1994-10-24T23:59:59.000Z

27

Reaching corporate sustainability goals requires new thinking, testing options, and a diverse skill set.  

E-Print Network (OSTI)

requires a system of sensors and software that gathers and analyzes data while balancing loads in real time. · Online display of remote microgrid data for analysis, management, and education;5 Economic & Environmental Analysis of Converting Waste Grease to Energy Shyyon Kishani & Kevin Dang JACK

28

Steam Reforming, 6-in. Bench-Scale Design and Testing Project -- Technical and Functional Requirements Description  

SciTech Connect

Feasibility studies and technology development work are currently being performed on several processes to treat radioactive liquids and solids currently stored at the Idaho Nuclear Technology and Engineering Center (INTEC), located within the Idaho National Engineering and Environmental Laboratory (INEEL). These studies and development work will be used to select a treatment process for treatment of the radioactive liquids and solids to meet treatment milestones of the Settlement Agreement between the Department of Energy and the State of Idaho. One process under consideration for treating the radioactive liquids and solids, specifically Sodium-Bearing Waste (SBW) and tank heel solids, is fluid bed steam reforming (FBSR). To support both feasibility and development studies a bench-scale FBSR is being designed and constructed. This report presents the technical and functional requirements, experimental objectives, process flow sheets, and equipment specifications for the bench-scale FBSR.

Losinski, Sylvester John; Marshall, Douglas William

2002-08-01T23:59:59.000Z

29

Correlating Dynamometer Testing to In-Use Fleet Results of Plug-In Hybrid Electric Vehicles  

DOE Green Energy (OSTI)

Standard dynamometer test procedures are currently being developed to determine fuel and electrical energy consumption of plug-in hybrid vehicles (PHEV). To define a repeatable test procedure, assumptions were made about how PHEVs will be driven and charged. This study evaluates these assumptions by comparing results of PHEV dynamometer testing following proposed procedures to actual performance of PHEVs operating in the US Department of Energy’s (DOE) North American PHEV Demonstration fleet. Results show PHEVs in the fleet exhibit a wide range of energy consumption, which is not demonstrated in dynamometer testing. Sources of variation in performance are identified and examined.

John G. Smart; Sera White; Michael Duoba

2009-05-01T23:59:59.000Z

30
31

Requirements for Defining Utility Drive Cycles: An Exploratory Analysis of Grid Frequency Regulation Data for Establishing Battery Performance Testing Standards  

DOE Green Energy (OSTI)

Battery testing procedures are important for understanding battery performance, including degradation over the life of the battery. Standards are important to provide clear rules and uniformity to an industry. The work described in this report addresses the need for standard battery testing procedures that reflect real-world applications of energy storage systems to provide regulation services to grid operators. This work was motivated by the need to develop Vehicle-to-Grid (V2G) testing procedures, or V2G drive cycles. Likewise, the stationary energy storage community is equally interested in standardized testing protocols that reflect real-world grid applications for providing regulation services. As the first of several steps toward standardizing battery testing cycles, this work focused on a statistical analysis of frequency regulation signals from the Pennsylvania-New Jersey-Maryland Interconnect with the goal to identify patterns in the regulation signal that would be representative of the entire signal as a typical regulation data set. Results from an extensive time-series analysis are discussed, and the results are explained from both the statistical and the battery-testing perspectives. The results then are interpreted in the context of defining a small set of V2G drive cycles for standardization, offering some recommendations for the next steps toward standardizing testing protocols.

Hafen, Ryan P.; Vishwanathan, Vilanyur V.; Subbarao, Krishnappa; Kintner-Meyer, Michael CW

2011-10-19T23:59:59.000Z

32

Regulatory fire test requirements for plutonium air transport packages : JP-4 or JP-5 vs. JP-8 aviation fuel.  

Science Conference Proceedings (OSTI)

For certification, packages used for the transportation of plutonium by air must survive the hypothetical thermal environment specified in 10CFR71.74(a)(5). This regulation specifies that 'the package must be exposed to luminous flames from a pool fire of JP-4 or JP-5 aviation fuel for a period of at least 60 minutes.' This regulation was developed when jet propellant (JP) 4 and 5 were the standard jet fuels. However, JP-4 and JP-5 currently are of limited availability in the United States of America. JP-4 is very hard to obtain as it is not used much anymore. JP-5 may be easier to get than JP-4, but only through a military supplier. The purpose of this paper is to illustrate that readily-available JP-8 fuel is a possible substitute for the aforementioned certification test. Comparisons between the properties of the three fuels are given. Results from computer simulations that compared large JP-4 to JP-8 pool fires using Sandia's VULCAN fire model are shown and discussed. Additionally, the Container Analysis Fire (CAFE) code was used to compare the thermal response of a large calorimeter exposed to engulfing fires fueled by these three jet propellants. The paper then recommends JP-8 as an alternate fuel that complies with the thermal environment implied in 10CFR71.74.

Figueroa, Victor G.; Lopez, Carlos; Nicolette, Vernon F.

2010-10-01T23:59:59.000Z

33

Idaho National Laboratory Lead or Lead-Bismuth Eutectic (LBE) Test Facility - R&D Requirements, Design Criteria, Design Concept, and Concept Guidance  

SciTech Connect

The Idaho National Laboratory Lead-Bismuth Eutectic Test Facility will advance the state of nuclear technology relative to heavy-metal coolants (primarily Pb and Pb-Bi), thereby allowing the U.S. to maintain the pre-eminent position in overseas markets and a future domestic market. The end results will be a better qualitative understanding and quantitative measure of the thermal physics and chemistry conditions in the molten metal systems for varied flow conditions (single and multiphase), flow regime transitions, heat input methods, pumping requirements for varied conditions and geometries, and corrosion performance. Furthering INL knowledge in these areas is crucial to sustaining a competitive global position. This fundamental heavy-metal research supports the National Energy Policy Development Group’s stated need for energy systems to support electrical generation.1 The project will also assist the Department of Energy in achieving goals outlined in the Nuclear Energy Research Advisory Committee Long Term Nuclear Technology Research and Development Plan,2 the Generation IV Roadmap for Lead Fast Reactor development, and Advanced Fuel Cycle Initiative research and development. This multi-unit Lead-Bismuth Eutectic Test Facility with its flexible and reconfigurable apparatus will maintain and extend the U.S. nuclear knowledge base, while educating young scientists and engineers. The uniqueness of the Lead-Bismuth Eutectic Test Facility is its integrated Pool Unit and Storage Unit. This combination will support large-scale investigation of structural and fuel cladding material compatibility issues with heavy-metal coolants, oxygen chemistry control, and thermal hydraulic physics properties. Its ability to reconfigure flow conditions and piping configurations to more accurately approximate prototypical reactor designs will provide a key resource for Lead Fast Reactor research and development. The other principal elements of the Lead-Bismuth Eutectic Test Facility (in addition to the Pool Unit and Storage Unit) are the Bench Scale Unit and Supporting Systems, principal of which are the O2 Sensor/Calibration System, Feed System, Transfer System, Off- Gas System, Purge and Evacuation System, Oxygen Sensor and Control System, Data Acquisition and Control System, and the Safety Systems. Parallel and/or independent corrosion studies and convective heat transfer experiments for cylindrical and annular geometries will support investigation of heat transfer phenomena into the secondary side. In addition, molten metal pumping concepts and power requirements will be measured for future design use.

Eric P. Loewen; Paul Demkowicz

2005-05-01T23:59:59.000Z

34

TEST  

Science Conference Proceedings (OSTI)

This is an abstract. TEST Lorem ipsum dolor sit amet, consectetur adipiscing elit. Cras lacinia dui et est venenatis lacinia. Vestibulum lacus dolor, adipiscing id mattis sit amet, ultricies sed purus. Nulla consectetur aliquet feugiat. Maecenas ips

35

Science Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Science Requirements About ESnet Overview ESnet Staff Governance Our Network Case Studies ESnet Strategic Plan ESnet Organizational Chart ESnet History Science Requirements Network...

36

Admission Requirements Admission Requirements for Graduate Study  

E-Print Network (OSTI)

required reports. Such a candidate may, for a nominal fee and with the approval of his/her graduate advisor://www.utdallas.edu/admissions/graduate/degrees/ There is a $50.00 nonrefundable application fee. Applicants are advised to carefully review the program a bachelor's degree. Test Scores (GMAT, GRE) Standardized test scores must be official and reported directly

O'Toole, Alice J.

37

Materials Reliability Program: Technical Basis for Change to American Society of Mechanical Engineers (ASME) Section XI Appendix VIII Root- Mean-Square Error Requirement for Qualification of Depth-Sizing for Ultrasonic Testing (UT) Performed from the In  

Science Conference Proceedings (OSTI)

This report provides the technical basis for a modification of the ultrasonic testing (UT) qualification requirements of Appendix VIII of ASME Section XI. A recommended change to the requirement for flaw depth-sizing uncertainty is presented on the basis of deterministic and probabilistic evaluation approaches.BackgroundCompliance with the 0.125" depth-sizing root-mean-square error (RMSE) required by ASME Code Section XI Appendix VIII (Supplements 2, 10, ...

2013-10-17T23:59:59.000Z

38

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 6.1 (July 2011) Chapter 6.1 (July 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must be certified and approved at certain levels that vary according to the dollar value of the

39

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

----------------------------------------------- ---------------------------------------- Chapter 6.1 (February 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must

40

Required Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Required Documents Required Documents Required Documents All foreign nationals, including students and postdocs, must select the foreign nationals employment category to complete the new-hire process. Contact (505) 665-7158 Email Complete following forms before New-Hire Orientation Be sure to bring the forms with you for the orientation event, but do not sign and date: Form I-9, Employment Eligibility Verification (pdf) - original, unexpired documents for verification of employment eligibility. Please refer to the I-9 verification form titled, "Lists of Acceptable Documents", which was included with your offer letter. (Laminated documents or hospital/temporary birth certificates are not accepted.) Note: Failure to provide required documents will result in delay and/or

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 6.1 (April 2009) Chapter 6.1 (April 2009) Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in FAR Part 6. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must be certified and approved at certain levels that vary according to the dollar value of the acquisition. The information that must be included in each justification is

42

School requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

a smooth surface and no "lip". Some presentations require AV equipment such as LCD or overhead projectors. A wireless microphone and sound system may be helpful to ensure that...

43

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 6.1 (April 2010) Chapter 6.1 (April 2010) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must be certified and approved at certain levels that vary according to the dollar value of the acquisition. The information that must be included in each justification is identified in FAR

44

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

--------------------------- Chapter 6.5 (January 2011) 1 Competition Advocate Responsibilities [Reference: FAR 6.5, FAR 7 and DEAR 906.501] Overview This section discusses the competition advocate requirements and provides a Federal Procurement Data System-New Generation (FPDS-NG) coding assistance sheet and screen shots for the FPDS-NG Competition Report. Background FAR Part 6.5, -Competition Advocates,‖ implements section 20 of the Office of Federal Procurement Policy Act, which requires the head of each executive agency to designate an Agency Competition Advocate and Procuring Activity Advocates (hereafter referred to as Activity Competition Advocates). In accordance with DEAR 906.501, the Secretary of

45

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Chapter 5.2 (April 2008) - Chapter 5.2 (April 2008) Synopsizing Proposed Non-Competitive Contract Actions Citing the Authority of FAR 6.302-1 [Reference: FAR 5 and DEAR 905] Overview This section discusses publicizing sole source actions as part of the approval of a Justification for Other than Full and Open Competition (JOFOC) using the authority of FAR 6.302-1. Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in FAR Part 6. One exception permits contracting without full and open competition when the required supplies or services are available from only one responsible source (FAR 6.302-1). This exception is

46

Mining Test Cases To Improve Software Maintenance  

E-Print Network (OSTI)

Requirements Testing Progress: How Well Does the Test Suitefocused on? Does it adequately test all requirements? Howa loop. • Does a test exercise a requirement exhaustively?

Ziftci, Celal

47

Fleet servicing facilities for servicing, maintaining, and testing rail and truck radioactive waste transport systems: functional requirements, technical design concepts and options cost estimates and comparisons  

Science Conference Proceedings (OSTI)

This is a resource document which examines feasibility design concepts and feasibility studies of a Fleet Servicing Facility (FSF). Such a facility is intended to be used for routine servicing, preventive maintenance, and for performing requalification license compliance tests and inspections, minor repairs, and decontamination of both the transportation casks and their associated rail cars or tractor-trailers. None of the United States' waste handling plants presently receiving radioactive wastes have an on-site FSF, nor is there an existing third party facility providing these services. This situation has caused the General Accounting Office to express concern regarding the quality of waste transport system maintenance once the system is placed into service. Thus, a need is indicated for FSF's, or their equivalent, at various radioactive materials receiving sites. In this report, three forms of FSF's solely for spent fuel transport systems were examined: independent, integrated, and colocated. The independent concept was already the subject of a detailed report and is extensively referenced in this document so that capital cost comparisons of the three concepts could be made. These facilities probably could service high-level, intermediate-level, low-level, or other waste transportation systems with minor modification, but this study did not include any system other than spent fuel. Both the Integrated and Colocated concepts were assumed to be associated with some radioactive materials handling facility such as an AFR repository.

Watson, C.D.; Hudson, B.J.; Keith, D.A.; Preston, M.K. Jr.; McCreery, P.N.; Knox, W.; Easterling, E.M.; Lamprey, A.S.; Wiedemann, G.

1980-05-01T23:59:59.000Z

48

Risk Based Requirements for Long Term Stewardship: A Proof-of-Principle Analysis of an Analytic Method Tested on Selected Hanford Locations  

Science Conference Proceedings (OSTI)

Since 1989, the Department of Energy's (DOE) Environmental Management (EM) Program has managed the environmental legacy of US nuclear weapons production research and testing at 137 facilities in 31 states and one US territory. The EM program has conducted several studies on the public risks posed by contaminated sites at these facilities. In Risks and the Risk Debate DOE, 1995a, the Department analyzed the risks at sites before, during, and after remediation work by the EM program. The results indicated that aside from a few urgent risks, most hazards present little inherent risk because physical and active site management controls limit both the releases of site contaminants, and public access to these hazards. Without these controls, these sites would pose greater risks to the public. Past risk reports, however, provided little irdiormation about post- cleanup risk, primarily because of uncertainty about fiture site uses and site characteristics at the end of planned cleanup activities. This is of concern because in many cases current cleanup technologies, and remedies, will last a shorter period of time than the waste itself and the resulting contamination will remain hazardous.

GM Gelston; JW Buck; LR Huesties; MS Peffers; TB Miley; TT Jarvis; WB Andrews

1998-12-03T23:59:59.000Z

49

ASCR Science Network Requirements  

Science Conference Proceedings (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In April 2009 ESnet and the Office of Advanced Scientific Computing Research (ASCR), of the DOE Office of Science, organized a workshop to characterize the networking requirements of the programs funded by ASCR. The ASCR facilities anticipate significant increases in wide area bandwidth utilization, driven largely by the increased capabilities of computational resources and the wide scope of collaboration that is a hallmark of modern science. Many scientists move data sets between facilities for analysis, and in some cases (for example the Earth System Grid and the Open Science Grid), data distribution is an essential component of the use of ASCR facilities by scientists. Due to the projected growth in wide area data transfer needs, the ASCR supercomputer centers all expect to deploy and use 100 Gigabit per second networking technology for wide area connectivity as soon as that deployment is financially feasible. In addition to the network connectivity that ESnet provides, the ESnet Collaboration Services (ECS) are critical to several science communities. ESnet identity and trust services, such as the DOEGrids certificate authority, are widely used both by the supercomputer centers and by collaborations such as Open Science Grid (OSG) and the Earth System Grid (ESG). Ease of use is a key determinant of the scientific utility of network-based services. Therefore, a key enabling aspect for scientists beneficial use of high performance networks is a consistent, widely deployed, well-maintained toolset that is optimized for wide area, high-speed data transfer (e.g. GridFTP) that allows scientists to easily utilize the services and capabilities that the network provides. Network test and measurement is an important part of ensuring that these tools and network services are functioning correctly. One example of a tool in this area is the recently developed perfSONAR, which has already shown its usefulness in fault diagnosis during the recent deployment of high-performance data movers at NERSC and ORNL. On the other hand, it is clear that there is significant work to be done in the area of authentication and access control - there are currently compatibility problems and differing requirements between the authentication systems in use at different facilities, and the policies and mechanisms in use at different facilities are sometimes in conflict. Finally, long-term software maintenance was of concern for many attendees. Scientists rely heavily on a large deployed base of software that does not have secure programmatic funding. Software packages for which this is true include data transfer tools such as GridFTP as well as identity management and other software infrastructure that forms a critical part of the Open Science Grid and the Earth System Grid.

Dart, Eli; Tierney, Brian

2009-08-24T23:59:59.000Z

50

Accreditation Requirements for Construction Materials Testing  

Science Conference Proceedings (OSTI)

... D4435 Preparing Rock Core Specimens and Determining Tolerances D4543 Slake Durability of Shales and Weak Rocks D4644 ...

2010-04-28T23:59:59.000Z

51

Test Purpose Generation for Timed Protocol Testing  

Science Conference Proceedings (OSTI)

Test purposes are requirements, usually constructed by hand, which aim at testing critical properties on implementations. These ones are then used by testing methods to generate test cases. Writing them manually is a heavy task, this is why we propose ... Keywords: Timed protocols, conformance testing, test purpose, testability

Sébastien Salva; Antoine Rollet

2009-07-01T23:59:59.000Z

52

In-service Inspection Ultrasonic Testing of Reactor Pressure Vessel Welds for Assessing Flaw Density and Size Distribution per 10 CFR 50.61a, Alternate Fracture Toughness Requirements  

SciTech Connect

Pressurized thermal shock (PTS) events are system transients in a pressurized water reactor (PWR) in which there is a rapid operating temperature cool-down that results in cold vessel temperatures with or without repressurization of the vessel. The rapid cooling of the inside surface of the reactor pressure vessel (RPV) causes thermal stresses that can combine with stresses caused by high pressure. The aggregate effect of these stresses is an increase in the potential for fracture if a pre-existing flaw is present in a material susceptible to brittle failure. The ferritic, low alloy steel of the reactor vessel beltline adjacent to the core, where neutron radiation gradually embrittles the material over the lifetime of the plant, can be susceptible to brittle fracture. The PTS rule, described in the Code of Federal Regulations, Title 10, Section 50.61 (§50.61), “Fracture Toughness Requirements for Protection against Pressurized Thermal Shock Events,” adopted on July 23, 1985, establishes screening criteria to ensure that the potential for a reactor vessel to fail due to a PTS event is deemed to be acceptably low. The U.S. Nuclear Regulatory Commission (NRC) completed a research program that concluded that the risk of through-wall cracking due to a PTS event is much lower than previously estimated. The NRC subsequently developed a rule, §50.61a, published on January 4, 2010, entitled “Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events” (75 FR 13). Use of the new rule by licensees is optional. The §50.61a rule differs from §50.61 in that it requires licensees who choose to follow this alternate method to analyze the results from periodic volumetric examinations required by the ASME Code, Section XI, Rules for Inservice Inspection (ISI) of Nuclear Power Plants. These analyses are intended to determine if the actual flaw density and size distribution in the licensee’s reactor vessel beltline welds are bounded by the flaw density and size distribution values used in the PTS technical basis. Under a contract with the NRC, Pacific Northwest National Laboratory (PNNL) has been working on a program to assess the ability of current inservice inspection (ISI)-ultrasonic testing (UT) techniques, as qualified through ASME Code, Appendix VIII, Supplements 4 and 6, to detect small fabrication or inservice-induced flaws located in RPV welds and adjacent base materials. As part of this effort, the investigators have pursued an evaluation, based on the available information, of the capability of UT to provide flaw density/distribution inputs for making RPV weld assessments in accordance with §50.61a. This paper presents the results of an evaluation of data from the 1993 Browns Ferry Nuclear Plant, Unit 3, Spirit of Appendix VIII reactor vessel examination, a comparison of the flaw density/distribution from this data with the distribution in §50.61a, possible reasons for differences, and plans and recommendations for further work in this area.

Sullivan, Edmund J.; Anderson, Michael T.; Norris, Wallace

2012-09-17T23:59:59.000Z

53

Overview of Conformance Testing  

Science Conference Proceedings (OSTI)

... require not just one test per error but one test per possible permutation of errors. ... to maximize automation and minimize human intervention. ...

2010-10-05T23:59:59.000Z

54

NVLAP Biometrics Testing LAP  

Science Conference Proceedings (OSTI)

... reserves the right to update, modify or rename the set of test methods associated with any scope of accreditation. Proficiency Testing Requirements. ...

2013-07-26T23:59:59.000Z

55

Pig shipping container test sequence  

SciTech Connect

This test plan outlines testing of the integrity of the pig shipping container. It is divided into four sections: (1) drop test requirements; (2) test preparations; (3) perform drop test; and (4) post-test examination.

Adkins, H.E. Jr.

1995-01-13T23:59:59.000Z

56

Quantifying requirements volatility effects  

Science Conference Proceedings (OSTI)

In an organization operating in the bancassurance sector we identified a low-risk IT subportfolio of 84 IT projects comprising together 16,500 function points, each project varying in size and duration, for which we were able to quantify its requirements ... Keywords: ?-ratio, ?-ratio, Compound monthly growth rate, IT dashboard, IT portfolio management, Quantitative IT portfolio management, Requirements churn, Requirements creep, Requirements metric, Requirements scrap, Requirements volatility, Requirements volatility dashboard, Scope creep, Volatility benchmark, Volatility tolerance factor

G. P. Kulk; C. Verhoef

2008-08-01T23:59:59.000Z

57

Repository seals requirement study  

Science Conference Proceedings (OSTI)

The Yucca Mountain Site Characterization Project, managed by the Civilian Radioactive Waste Management System (CRWMS) Management and Operating Contractor (M and O) is conducting investigations to support the Viability Assessment and the License Application for a high-level nuclear waste repository at Yucca Mountain, Nevada. The sealing subsystem is part of the Yucca Mountain Waste Isolation System. The Yucca Mountain Site Characterization Project is currently evaluating the role of the sealing subsystem (shaft, ramp and exploratory borehole seals) in achieving the overall performance objectives for the Waste Isolation System. This report documents the results of those evaluations. The objective of the study is to provide water or air flow performance based requirements for shafts, ramps, and exploratory boreholes located near the repository. Recommendations, as appropriate, are provided for developing plans, seals component testing, and other studies relating to sealing.

NONE

1997-11-03T23:59:59.000Z

58

LBNL Window & Daylighting Software -- RESFEN: System Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

SYSTEM REQUIREMENTS OPERATING SYSTEM Program has been tested on Microsoft Windows 7, Windows XP, Windows 2000TM.. Older version of Microsoft Windows might work, but are not...

59

LBNL Windows & Daylighting Software -- THERM: System Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

SYSTEM REQUIREMENTS OPERATING SYSTEM Program has been tested on Microsoft Windows XP, Windows 2000TM.. Older version of Microsoft Windows might work, but are not supported. (The...

60

LBNL Windows & Daylighting Software -- WINDOW: System Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

REQUIREMENTS OPERATING SYSTEM Program has been tested on Microsoft Vista, Microsoft Windows 7, Microsoft Windows XP, Windows 2000TM.. It has been reported by users that the...

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Repository seals requirements study  

SciTech Connect

The Yucca Mountain Site Characterization Project, managed by the Civilian Radioactive Waste Management System (CRWMS) Management and Operating Contractor (M and O) is conducting investigations to support the Viability Assessment and the License Application for a high-level nuclear waste repository at Yucca Mountain, Nevada. The sealing subsystem is part of the Yucca Mountain Waste Isolation System. The Yucca Mountain Site Characterization Project is currently evaluating the role of the sealing subsystem (shaft, ramp and exploratory borehole seals) in achieving the overall performance objectives for the Waste Isolation System. This report documents the results of those evaluations. This report presents the results of a repository sealing requirements study. Sealing is defined as the permanent closure of the shafts, ramps, and exploratory boreholes. Sealing includes those components that would reduce potential inflows above the repository, or that would divert flow near the repository horizon to allow vertical infiltration to below the repository. Sealing of such features as emplacement drifts was not done in this study because the current capability to calculate fracture flow into the drifts is not sufficiently mature. The objective of the study is to provide water or air flow performance based requirements for shafts, ramps, and exploratory boreholes located near the repository. Recommendations, as appropriate, are provided for developing plans, seals component testing, and other studies relating to sealing.

NONE

1997-11-03T23:59:59.000Z

62

Test Automation Test Automation  

E-Print Network (OSTI)

Test Automation Test Automation Mohammad Mousavi Eindhoven University of Technology, The Netherlands Software Testing 2013 Mousavi: Test Automation #12;Test Automation Outline Test Automation Mousavi: Test Automation #12;Test Automation Why? Challenges of Manual Testing Test-case design: Choosing inputs

Mousavi, Mohammad

63

BER Requirements Review 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

About ESnet Overview ESnet Staff Governance Our Network Case Studies ESnet Strategic Plan ESnet Organizational Chart ESnet History Science Requirements Network Requirements...

64

ASCR Requirements Review 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

About ESnet Overview ESnet Staff Governance Our Network Case Studies ESnet Strategic Plan ESnet Organizational Chart ESnet History Science Requirements Network Requirements...

65

TVDG Training Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Training Requirements TVDG Training Requirements information is now located at: http:www.bnl.govuserscenterTrainingtandem.asp. You will automatically be taken to the new...

66

HAN System Security Requirements  

Science Conference Proceedings (OSTI)

This report, "Home Area Network (HAN) Security Requirements," identifies and discusses the key cyber security requirements for different interfaces of HAN-based systems. These cyber security requirements for HAN interfaces are derived from the Department of Homeland Security (DHS) "Catalog of Control Systems Security," which provides an excellent checklist of general security requirements.

2009-12-22T23:59:59.000Z

67

Acceptance Test Refactoring  

E-Print Network (OSTI)

Abstract. In Executable Acceptance Test Driven Development, acceptance tests represent the requirements of a software system. As requirements change over time, the acceptance tests have to be updated and maintained. This process can be time-consuming and risky as acceptance tests lack the regression safety net that production code has. Refactoring of acceptance tests is used to keep the fixtures and the acceptance test definitions consistent.

Heiko Ordelt; Frank Maurer

2008-01-01T23:59:59.000Z

68

Requirement-Reviews.pptx  

NLE Websites -- All DOE Office Websites (Extended Search)

Published 3 h%p:www.nersc.govsciencerequirements---reviews final---reports * Compurequirements f or 20132014 * Execurequirements * Case s...

69

Allocating Reserve Requirements (Presentation)  

DOE Green Energy (OSTI)

This presentation provides an overview of present and possible future ways to allocate and assign benefits for reserve requirements.

Milligan, M.; Kirby, B.; King, J.

2011-07-01T23:59:59.000Z

70

Collaborative Requirements Engineering Project  

Science Conference Proceedings (OSTI)

... dependencies, safety, and environmental requirements) is essential to the ... Construction, and Operation of Constructed Facilities, March 2012. ...

2013-01-03T23:59:59.000Z

71

Emergency Medical Treatment Required  

E-Print Network (OSTI)

Emergency Medical Treatment Required Non-Emergency Medical Treatment Required If possible, get help present if possible OptaComp will complete the "First Report of Injury or Illness" and authorize medical Investigation Report" to Environmental Health & Safety within 48 hours Emergency Medical Treatment Required

Weston, Ken

72

FES Science Network Requirements  

E-Print Network (OSTI)

FES Science Network Requirements Report of the Fusion Energy Sciences Network Requirements Workshop Conducted March 13 and 14, 2008 #12;FES Science Network Requirements Workshop Fusion Energy Sciences Program Office, DOE Office of Science Energy Sciences Network Gaithersburg, MD ­ March 13 and 14, 2008 ESnet

Geddes, Cameron Guy Robinson

73

PIT Coating Requirements Analysis  

SciTech Connect

This study identifies the applicable requirements for procurement and installation of a coating intended for tank farm valve and pump pit interior surfaces. These requirements are intended to be incorporated into project specification documents and design media. This study also evaluates previously recommended coatings and identifies requirement-compliant coating products.

MINTEER, D.J.

2000-10-20T23:59:59.000Z

74

Transportation System Requirements Document  

SciTech Connect

This Transportation System Requirements Document (Trans-SRD) describes the functions to be performed by and the technical requirements for the Transportation System to transport spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from Purchaser and Producer sites to a Civilian Radioactive Waste Management System (CRWMS) site, and between CRWMS sites. The purpose of this document is to define the system-level requirements for Transportation consistent with the CRWMS Requirement Document (CRD). These requirements include design and operations requirements to the extent they impact on the development of the physical segments of Transportation. The document also presents an overall description of Transportation, its functions, its segments, and the requirements allocated to the segments and the system-level interfaces with Transportation. The interface identification and description are published in the CRWMS Interface Specification.

1993-09-01T23:59:59.000Z

75

Mandatory Supervisory Training Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mandatory Supervisory Training Requirements Mandatory Supervisory Training Requirements All DOE supervisors, managers, and executives will comply with mandatory supervisory training requirements (5 CFR 412; 5 CFR 315.801; 5 CFR 315.901; DOE O 360.1; and DOE O 320.1): * New supervisors: 80 hours of supervisory training, with 40 hours required to be completed during the supervisory probationary period. * Experienced supervisors: minimum of 8 hours of supervisory training each year. The Office of Learning and Workforce Development has developed an inventory of training and developmental activities that will meet the supervisory training requirements. The DOE courses Supervisory Essentials (32 hours) and Navigating the Federal Hiring Process (8 hours) are required to fulfill the first year 40-hour training

76

Management requirements for accreditation  

Science Conference Proceedings (OSTI)

... handbook, shall be defined in the quality manual. ... It is a fundamental requirement that the results ... NIST Handbook 150 (and ISO/IEC 17025) details ...

2013-08-20T23:59:59.000Z

77

Public Safety Network Requirements  

Science Conference Proceedings (OSTI)

... need excellent situational awareness in order to do their jobs effectively. ... performance requirements as shown in Figure 2. This analysis was used ...

2013-03-13T23:59:59.000Z

78

CCI: Program Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Your Arrival Your First Day Weekly Activities Program Requirements Checkout FAQ The DOE WDTS site has comprehensive information on Participant Obligations. Consult that site for...

79

Public Safety Network Requirements  

Science Conference Proceedings (OSTI)

... Usage scenario. ... imposed by public safety applications and usage scenarios is key in ... requirements as shown in Figure 2. This analysis was used as ...

2010-10-05T23:59:59.000Z

80

ASCR Science Network Requirements  

E-Print Network (OSTI)

ASCR Science Network Requirements Office of AdvancedScientific Computing Research, DOE Office of ScienceEnergy Sciences Network Gaithersburg, MD — April 15 and 16,

Dart, Eli

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

New Employee Training Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

All New Employees New Supervisors New Employee Training Requirements Welcome to Berkeley Lab We value you and the talents that you bring to our workplace. The training listed...

82

Integrated Management Requirements mapping  

Science Conference Proceedings (OSTI)

This document contains five appendices documenting how Sandia implemented the DOE Conduct of Operations (5480.19) and DOE Quality Assurance (5700.6C) orders. It provides a mapping of the Sandia integrated requirements to the specific requirements of each Order and a mapping to Sandia's approved program for implementing the Conduct of Operations Order.

Holmes, J.T.; Andrews, N.S.

1992-06-01T23:59:59.000Z

83

Evaporative Testing Requirements for Dual-Fuel Compressed Natural Gas (CNG)/Gasoline and Liquefied Petroleum Gas (LPG)/Gasoline Vehicles – Revision of MAC #99-01 To Allow Subtraction of Methane Emissions from  

E-Print Network (OSTI)

The attached MAC clarifies the Air Resources Board's procedures regarding evaporative emission testing of dual-fuel CNG/gasoline vehicles. This MAC revises and supersedes MAC #99-01 by allowing manufacturers to determine, report, and subtract methane emissions when a dual-fuel CNG/gasoline vehicle is tested for evaporative emissions. A related revision clarifies that for dual-fuel CNG/gasoline medium-duty vehicles, the applicable “LEV I ” evaporative emission standards, which are dependent on the fuel tank capacity of the medium-duty vehicles, are determined solely on the fuel tank capacity of the gasoline fuel system. If you have any questions or comments, please contact Mr. Steven Hada, Air

Alan C. Lloyd, Ph.D.; Arnold Schwarzenegger; All Heavy-duty Vehicle Manufacturers

2004-01-01T23:59:59.000Z

84

Healthcare Information Technology Testing  

Science Conference Proceedings (OSTI)

... products. NIST Handbook 150 and NIST Handbook 150-31 provide the general and the specific requirements for all HIT testing. ...

2013-09-13T23:59:59.000Z

85

Voting System Testing  

Science Conference Proceedings (OSTI)

... required to be accredited to all core test methods involving: 1) technical data package review; 2) physical configuration audit (including examination ...

2013-09-06T23:59:59.000Z

86

Full SPP Partnership Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Partnership Requirements: Partnership Requirements: ENERGY STAR Partnership for Commercial & Industrial Service and Product Providers (SPP) Eligible Organizations Companies providing energy efficiency services and products to commercial buildings and industrial manufacturing facilities/plants are eligible for the Service and Product Provider (SPP) partnership, but must meet certain requirements as specified below. Types of eligible companies include: architecture, distributor, energy consultant/energy management services, energy improvement contractor, energy information services, energy services company (ESCO), engineering, equipment manufacturer, financial services, on-site energy production services, unregulated energy retailer and marketer, or other supplier of standard energy-efficient products and/or services for commercial buildings and/or

87

Technical Safety Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Safety Requirements Safety Requirements FUNCTIONAL AREA GOAL: Contractor has developed, maintained, and received DOE Field Office Approval for the necessary operating conditions of a facility. The facility has also maintained an inventory of safety class and safety significant systems and components. REQUIREMENTS:  10 CFR 830.205, Nuclear Safety Rule.  DOE-STD-3009-2002, Preparation Guide for U. S. Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses.  DOE-STD-1186-2004, Specific Administrative Controls. Guidance:  DOE G 423.1-1, Implementation Guide for Use in Developing Technical Safety Requirements.  NSTP 2003-1, Use of Administrative Controls for Specific Safety Functions. Performance Objective 1: Contractor Program Documentation

88

BES Science Network Requirements  

E-Print Network (OSTI)

the Directors of the Office of Science, Office of AdvancedOffice of Basic Energy Sciences. This is LBNL report LBNL-BES Science Network Requirements Report of the Basic Energy

Dart, Eli

2011-01-01T23:59:59.000Z

89

NSLS II: Authentication Required  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Pages Login Access to this area of the NSLS-II website requires a valid username and password. Username: Password: Next > Last Modified: April 2, 2013 Please forward all...

90

Heat pipe testing program test plan  

SciTech Connect

A test plan is given which describes the tests to be conducted on several typical solar receiver heat pipes. The hardware to be used, test fixtures and rationale of the test program are discussed. The program objective is to perform life testing under simulated receiver conditions, and to conduct performance tests with selected heat pipes to further map their performance, particularly with regard to their transient behavior. Performance requirements are defined. Test fixtures designed for the program are described in detail, and their capabilities for simulating the receiver conditions and their limitations are discussed. The heat pipe design is given. (LEW)

Bienert, W.B.

1980-03-14T23:59:59.000Z

91

Advanced empirical testing  

Science Conference Proceedings (OSTI)

In today's industrial applications, we see that knowledge systems are successfully implemented. However, critical domains require the elaborate and thoughtful validation of the knowledge bases before the deployment. Empirical testing, also known as regression ... Keywords: Evaluation, Knowledge quality, Quality measures, Regression testing, Test cases, Test visualization, Validation, Verification

Joachim Baumeister

2011-02-01T23:59:59.000Z

92

***IMMEDIATE RESPONSE REQUIRED***  

Science Conference Proceedings (OSTI)

... with the costly techniques in use today. ... a network generates interference and wastes energy. ... Evolutionary Computation—The Fossil Record IEEE ...

2009-10-02T23:59:59.000Z

93

Regulators, Requirements, Statutes  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulators, Requirements, Statutes Regulators, Requirements, Statutes Regulators, Requirements, Statutes The Laboratory must comply with environmental laws and regulations that apply to Laboratory operations. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Environmental laws and regulations LANL complies with more than 30 state and federal regulations and policies designed to protect human health and the environment. Regulators Regulators Environmental Protection Agency (EPA) EPA Homepage EPA - Region VI U.S. Department of Energy (DOE) DOE Homepage DOE Environmental Policy DOE Citizen's Advisory Board U.S. Fish and Wildlife Service (FWS) Southwest Region 2 New Mexico Environment Department (NMED) NMED Homepage NMED DOE Oversight Office

94

VFP: Program Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Requirements Program Requirements Home Welcome Researcher! Preparing for Your Visit Your Arrival Your First Day Weekly Activities Program Requirements Checkout FAQ The DOE WDTS site has comprehensive information on Participant Obligations. Consult that site for more information on all deliverables except the Fermilab Summer Interns website. Attendance: Complete the full ten-week program and attend all scheduled events including lectures, tours and group activities. Entrance Survey: Complete the entrance survey within your first week at Fermilab. One-page Peer Review Provide a one-page written peer review of another SULI intern' talk or poster. Abstract for General Audience Complete and submit an abstract summarizing your research experience. Oral or Poster Presentation: Deliver an oral or poster presentation to mentors and peers the final week

95

BER Science Network Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Network Network Requirements Report of the Biological and Environmental Research Network Requirements Workshop Conducted July 26 and 27, 2007 BER Science Network Requirements Workshop Biological and Environmental Research Program Office, DOE Office of Science Energy Sciences Network Bethesda, MD - July 26 and 27, 2007 ESnet is funded by the US Dept. of Energy, Office of Science, Advanced Scientific Computing Research (ASCR) program. Dan Hitchcock is the ESnet Program Manager. ESnet is operated by Lawrence Berkeley National Laboratory, which is operated by the University of California for the US Department of Energy under contract DE-AC02-05CH11231. This work was supported by the Directors of the Office of Science, Office of Advanced Scientific Computing Research, Facilities Division, and the Office of Biological &

96

SULI: Program Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Requirements Program Requirements Home Welcome Intern! Preparing for Your Internship Your Arrival Your First Day Weekly Activities Program Requirements Checkout FAQ The DOE WDTS site has comprehensive information on Participant Obligations. Consult that site for more information on all deliverables except the Fermilab Summer Interns website. Attendance: Complete the full ten-week program and attend all scheduled events including lectures, tours and group activities. Entrance Survey: First create an account by following the link, educationLink New Account Setup. After creating the account, you can login to the educationLink site. Complete the entrance survey posted on your EduLink site within your first week at Fermilab. One-page Peer Review Provide a one-page written peer review of another SULI intern' talk or

97

Federal Metering Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Metering Requirements Metering Requirements FUPWG - May 23, 2013 Brad Gustafson Federal Energy Management Program 2 42 USC 8253 - ENERGY MANAGEMENT REQUIREMENT (e) Metering By October 1, 2012, in accordance with guidelines established by the Secretary under paragraph (2), all Federal buildings shall, for the purposes of efficient use of energy and reduction in the cost of electricity used in such buildings, be metered. Each agency shall use, to the maximum extent practicable, advanced meters or advanced metering devices that provide data at least daily and that measure at least hourly consumption of electricity in the Federal buildings of the agency. Not later than October 1, 2016, each agency shall provide for equivalent metering of natural gas and steam, in accordance with guidelines established by the Secretary

98

Requirements engineering with ORM  

Science Conference Proceedings (OSTI)

The number of IT project overspends and failures suggest that many IT projects do not conform to requirements. Despite decades of development the IT industry still seems to lack an effective method of ensuring that a project will be right first time. ...

Ken Evans

2005-10-01T23:59:59.000Z

99

Requirements for Xenon International  

Science Conference Proceedings (OSTI)

This document defines the requirements for the new Xenon International radioxenon system. The output of this project will be a Pacific Northwest National Laboratory (PNNL) developed prototype and a manufacturer-developed production prototype. The two prototypes are intended to be as close to matching as possible; this will be facilitated by overlapping development cycles and open communication between PNNL and the manufacturer.

Hayes, James C.; Ely, James H.

2013-09-26T23:59:59.000Z

100

Training requirements. - 19...  

NLE Websites -- All DOE Office Websites (Extended Search)

G H I J K L M N O P Q R S T U V W X Y Z www.OSHA.gov Regulations (Standards - 29 CFR) Training requirements. - 1926.454 Regulations (Standards - 29 CFR) - Table of Contents * Part...

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

NERSC Requirements Workshop November  

NLE Websites -- All DOE Office Websites (Extended Search)

Requirements Requirements Workshop November 2009 Lattice gauge theory and some other HE theory Doug Toussaint (University of Arizona) Help from: Paul Mackenzie (Fermilab) Crude comparison of lattice hadron spec- trum to the real world. Lattice Gauge Theory First-principles computations in QCD Also, computations in other strongly coupled field theories * Find hadronic factors to get fundamental physics from experi- ments * Understand structure and interactions of hadrons, maybe even nuclei * Understand QCD: confinement and chiral symmetry breaking * Other strongly interacting theories (what if we don't find the Higgs?) * Quark-gluon matter at high temeratures (RHIC, LHC, early uni- verse) or high densities (neutron stars) HEP theory projects at NERSC now: * Production and analysis of QCD configurations with dynamical quarks, (Doug Toussaint) (MILC collaboration) * Heavy quarks, using

102

Support Requirements for Synfuels  

E-Print Network (OSTI)

Producing synfuels from coal is technically feasible. Projects have a high probability of success but risks do exist (technical, marketing, environmental delays, regulatory and political changes, etc.). The various segments of the developing synfuels industry are identified. For each segment its characteristics, uncertainties and risks are discussed, as well as the type of support of guarantee required to develop this portion of the synfuels industry.

Hyland, M. J.

1981-01-01T23:59:59.000Z

103

BER Science Network Requirements  

Science Conference Proceedings (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In April 2010 ESnet and the Office of Biological and Environmental Research, of the DOE Office of Science, organized a workshop to characterize the networking requirements of the science programs funded by BER. The requirements identified at the workshop are summarized and described in more detail in the case studies and the Findings section. A number of common themes emerged from the case studies and workshop discussions. One is that BER science, like many other disciplines, is becoming more and more distributed and collaborative in nature. Another common theme is that data set sizes are exploding. Climate Science in particular is on the verge of needing to manage exabytes of data, and Genomics is on the verge of a huge paradigm shift in the number of sites with sequencers and the amount of sequencer data being generated.

Dart, Eli; Tierney, Brian

2010-11-01T23:59:59.000Z

104

Mutation testing strategies using mutant classification  

Science Conference Proceedings (OSTI)

Mutation testing has a widespread reputation of being a rather powerful testing technique. However, its practical application requires the detection of equivalent mutants. Detecting equivalent mutants is cumbersome since it requires manual analysis, ... Keywords: mutant classification, mutants' impact, mutation testing

Mike Papadakis; Yves Le Traon

2013-03-01T23:59:59.000Z

105

BES Science Network Requirements  

Science Conference Proceedings (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivityfor the US Department of Energy Office of Science (SC), the single largest supporter of basic research in the physical sciences in the United States. In support of the Office ofScience programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years.

Dart, Eli; Tierney, Brian; Dart, Eli; Biocca, A.; Carlson, R.; Chen, J.; Cotter, S.; Dattoria, V.; Davenport, J.; Gaenko, A.; Kent, P.; Lamm, M.; Miller, S.; Mundy, C.; Ndousse, T.; Pederson, M.; Perazzo, A.; Popescu, R.; Rouson, D.; Sekine, Y.; Sumpter, B.; Wang, C.-Z.; Whitelam, S.; Zurawski, J.

2011-02-01T23:59:59.000Z

106

Building Envelope Requirements Overview Page 3-1 3 Building Envelope Requirements  

E-Print Network (OSTI)

. For the building envelope, field verification and diagnostic testing procedures exist for insulation qualityBuilding Envelope Requirements ­ Overview Page 3-1 3 Building Envelope Requirements The building. The principal components of heating loads are building envelope infiltration as well as conduction losses

107

Core Requirements Test Suite for the 2005 VVSG Revision  

Science Conference Proceedings (OSTI)

... process from election definition through report generation. ... This package is distributed as an archive file ... contents of the Votetest distribution is given ...

2011-01-28T23:59:59.000Z

108

An Assessment of Fault Current Limiter Testing Requirements ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Reliability (OE) is conducting research and development (R&D) on next-generation electricity delivery equipment including fault current limiters (FCLs). Prototype FCL...

109

Equipment Operational Requirements  

SciTech Connect

The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

2009-06-11T23:59:59.000Z

110

A Test Suite Generator For Struts Based Applications.  

E-Print Network (OSTI)

??Testing web-based enterprise applications requires the use of automated testing frameworks. The testing framework's ability to run suites of test cases through development ensures enhancements… (more)

Jackson, Gregory M.

2004-01-01T23:59:59.000Z

111

Coaxial test fixture  

DOE Patents (OSTI)

This invention pertains to arrangements for performing electrical tests on contact material samples, and in particular for testing contact material test samples in an evacuated environment under high current loads. Frequently, it is desirable in developing high-current separable contact material, to have at least a preliminary analysis of selected candidate conductor materials. Testing of material samples will hopefully identify materials unsuitable for high current electrical contact without requiring incorporation of the materials into a completed and oftentimes complex structure.

Praeg, W.F.

1984-03-30T23:59:59.000Z

112

Security Resiliency Testing  

Science Conference Proceedings (OSTI)

An accepted practice within the electric sector is to pre-stage and test equipment before deployment. Verification of functionality, operating parameters, and interoperability of equipment to be deployed can often be incorporated into predeployment testing. This testing may also support the selection of features responsible for the security of the host equipment. However, some security features and many aspects of resiliency testing may require activation, interaction, and interoperability with an ...

2013-12-02T23:59:59.000Z

113

Current Test Procedure Waivers  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy's (DOE) regulations for covered products permit a person to seek a waiver, or an interim waiver, from the test procedure requirements for covered appliances and...

114

How Vehicles Are Tested  

NLE Websites -- All DOE Office Websites (Extended Search)

simulates cycling. The energy required to move the rollers can be adjusted to account for wind resistance and the vehicle's weight. Photo: Driver running car through test cycle on...

115

SPECTR System Operational Test Report  

Science Conference Proceedings (OSTI)

This report overviews installation of the Small Pressure Cycling Test Rig (SPECTR) and documents the system operational testing performed to demonstrate that it meets the requirements for operations. The system operational testing involved operation of the furnace system to the design conditions and demonstration of the test article gas supply system using a simulated test article. The furnace and test article systems were demonstrated to meet the design requirements for the Next Generation Nuclear Plant. Therefore, the system is deemed acceptable and is ready for actual test article testing.

W.H. Landman Jr.

2011-08-01T23:59:59.000Z

116

Match Pumps to System Requirements  

SciTech Connect

BestPractices Program tip sheet discussing pumping system efficiency matching pumps to system requirements

2005-10-01T23:59:59.000Z

117

DOE Testing Reveals Samsung Refrigerator Does Not Meet Energy...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Testing Reveals Samsung Refrigerator Does Not Meet Energy Star Requirements DOE Testing Reveals Samsung Refrigerator Does Not Meet Energy Star Requirements March 16, 2010 - 4:28pm...

118

DOE Challenge Home, California Program Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Challenge Home California Program Requirements These Program Requirements shall only be used in the State of California. To qualify as a DOE Challenge Home, a home shall meet the minimum requirements specified below, be verified and field-tested in accordance with HERS Standards by an approved verifier, and meet all applicable codes. Builders may meet the requirements of either the Performance Path or the Prescriptive path to qualify a home. 1 Single family detached and attached dwelling units, and dwelling units in multifamily buildings with 3 stories or fewer above-grade 2,3 are eligible for qualification. DOE Challenge Home Prescriptive Path The prescriptive path provides a single set of measures that can be used to construct a DOE Challenge Home labeled

119

DOE Challenge Home, Washington Program Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Challenge Home Washington Program Requirements 9-1-2013 To qualify as a DOE Challenge Home, a home shall meet the minimum requirements specified below, be verified and field-tested in accordance with HERS Standards by an approved verifier, and meet all applicable codes. Builders may meet the requirements of either the Performance Path or the Prescriptive path to qualify a home. 1 Single family detached and attached dwelling units, and dwelling units in multifamily buildings with 3 stories or fewer above-grade 2,3 are eligible for qualification. DOE Challenge Home Prescriptive Path The prescriptive path provides a single set of measures that can be used to construct a DOE Challenge Home labeled home. Modeling is not required, but no tradeoffs are allowed. Follow these steps to use the prescriptive path:

120

Requirements dependencies: the emergence of a requirements network  

Science Conference Proceedings (OSTI)

We believe that the requirements at the leaf-node level of the requirements tree structure cannot be viewed in isolation and that dependencies between them exist. We pursued this notion in order to find a coherent set of requirement dependencies that ...

Vishwajeet Kulshreshtha; John Boardman; Dinesh Verma

2012-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

NREL Battery Thermal and Life Test Facility (Presentation)  

DOE Green Energy (OSTI)

This presentation describes NREL's Battery Thermal Test Facility and identifies test requirements and equipment and planned upgrades to the facility.

Keyser, M.

2011-05-01T23:59:59.000Z

122

Solid Rocket Motor Acoustic Testing  

DOE Green Energy (OSTI)

Acoustic data are often required for the determination of launch and powered flight loads for rocket systems and payloads. Such data are usually acquired during test firings of the solid rocket motors. In the current work, these data were obtained for two tests at a remote test facility where we were visitors. This paper describes the data acquisition and the requirements for working at a remote site, interfacing with the test hosts.

Rogers, J.D.

1999-03-31T23:59:59.000Z

123

Utilization requirements. A Southern California gas company project SAGE report: utilization requirements. [Solar Assisted Gas Energy  

SciTech Connect

Utilization requirements are given and comparisons made of two phase III SAGE (solar assisted gas energy) installations in California: (1) a retrofit installation in an existing apartment building in El Toro, and (2) an installation in a new apartment building in Upland. Such testing in the field revealed the requirements to be met if SAGE-type installations are to become commercially practical on a widespread basis in electric and gas energy usage.

Barbieri, R.; Schoen, R.; Hirshberg, A.S.

1978-01-01T23:59:59.000Z

124

4.5 Audit Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Audit Requirements Audit Requirements Audit requirements are now contained in 2 separate sub-sections. Subsection 4.5.1 contains the audit requirements for States, Local Governments and Non-Profit Organizations while subsection 4.5.2 contains the audit requirements for For-Profit Organizations. 4.5.1 Audit Requirements for States, Local Governments and Non-Profit Organizations (a) General. All States, Local Governments and Non-Profit Organizations that expend over $500,000 in Federal funds in any year are required to have a single audit conducted in accordance with OMB Circular A-133. This requirement flows down to subrecipients that meet the dollar threshold. An independent auditor shall perform the audit in accordance with the Government Auditing Standards and must: 1) audit and provide opinions on the fair presentation of the

125

SG Network System Requirements Specification  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SG Network System Requirements Specification SG Network System Requirements Specification Interim Release 3 5/17/2010 - 2 - Table of Contents Document History ....................................................................................................................................... - 3 - Revision History .......................................................................................................................................... - 3 - Preface........................................................................................................................................................ - 4 - Authors........................................................................................................................................................ - 6 -

126

Building security requirements with CLASP  

Science Conference Proceedings (OSTI)

Traditionally, security requirements have been derived in an ad hoc manner. Recently, commercial software development organizations have been looking for ways to produce effective security requirements.In this paper, we show how to build security ... Keywords: application security, security process, security requirements

John Viega

2005-07-01T23:59:59.000Z

127

Solar Thermal Test Facility experiment manual  

DOE Green Energy (OSTI)

Information is provided on administrative procedures, capabilities, and requirements of experimenters using the Solar Thermal Test Facility. (MHR)

Darsey, D. M.; Holmes, J. T.; Seamons, L. O.; Kuehl, D. J.; Davis, D. B.; Stomp, J. M.; Matthews, L. K.; Otts, J. V.

1977-10-01T23:59:59.000Z

128

The Virtual Cement and Concrete Testing Laboratory ...  

Science Conference Proceedings (OSTI)

... the need to satisfy performance requirements in the ... electron microscope (Analytical Chemistry Division ... Compressive testing machines (Structures ...

2002-03-01T23:59:59.000Z

129

Acceptance-test specifications for Test Number Four: process sensor and display test. [LMFBR  

SciTech Connect

This document provides the general instructions for performing acceptance Test Number Four as indicated in the Acceptance Test Index (TI-022-130-003). Also indicated are the plant conditions and special equipment required to conduct the test. The acceptance criteria for each portion of the test are specified.

Bell, C.R.

1975-05-09T23:59:59.000Z

130

Data Requirements from NERSC Requirements Reviews Richard Gerber...  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Scientists represented by the NERSC user community have growing requirements for data storage, IO bandwidth, networking bandwidth, and data software and services. Over the...

131

Managing System of Systems Requirements with a Requirements Screening Group  

SciTech Connect

Figuring out an effective and efficient way to manage not only your Requirement’s Baseline, but also the development of all your individual requirements during a Program’s/Project’s Conceptual and Development Life Cycle Stages can be both daunting and difficult. This is especially so when you are dealing with a complex and large System of Systems (SoS) Program with potentially thousands and thousands of Top Level Requirements as well as an equal number of lower level System, Subsystem and Configuration Item requirements that need to be managed. This task is made even more overwhelming when you have to add in integration with multiple requirements’ development teams (e.g., Integrated Product Development Teams (IPTs)) and/or numerous System/Subsystem Design Teams. One solution for tackling this difficult activity on a recent large System of Systems Program was to develop and make use of a Requirements Screening Group (RSG). This group is essentially a Team made up of co-chairs from the various Stakeholders with an interest in the Program of record that are enabled and accountable for Requirements Development on the Program/Project. The RSG co-chairs, often with the help of individual support team, work together as a Program Board to monitor, make decisions on, and provide guidance on all Requirements Development activities during the Conceptual and Development Life Cycle Stages of a Program/Project. In addition, the RSG can establish and maintain the Requirements Baseline, monitor and enforce requirements traceability across the entire Program, and work with other elements of the Program/Project to ensure integration and coordination.

Ronald R. Barden

2012-07-01T23:59:59.000Z

132

NERVA Program. Operating procedure: cart cooling system, Test Cell A  

SciTech Connect

The instructions described in this procedure are typical of the operation of Test Cell A relative to the KIWI-B4A. Operation of Test Cell A relative to the NRX reactor will require modifications dictated by specific test requirements. Under NRX conditions, it will be the responsibility of the test cell manager to evaluate the capabilities of Test Cell A in terms of given test requirements and then set forth detailed checklists which will be compatible with the test requirements.

1963-09-01T23:59:59.000Z

133

Secretary Bodman's Memorandum Regarding Drug Testing at DOE  

Energy.gov (U.S. Department of Energy (DOE))

Decisions regarding drug testing for Department of Energy positions that require access authorizations (Security Clearances)

134

Fulfilled and missed requirements for online reservation systems: an empirical investigation of austrian and swiss hotels  

Science Conference Proceedings (OSTI)

Temporal data are a core element of a reservation. In this paper we formulate 10 requirements and 14 sub-requirements for handling temporal data in online hotel reservation systems (OHRS) from a usability viewpoint. We test the fulfillment of these requirements ... Keywords: B2C systems, requirements engineering, reservation systems, temporal data, tests, travel, usability

Gerhard F. Knolmayer, Viola Sini, Polina Chelnokova

2013-07-01T23:59:59.000Z

135

Project X functional requirements specification  

SciTech Connect

Project X is a multi-megawatt proton facility being developed to support intensity frontier research in elementary particle physics, with possible applications to nuclear physics and nuclear energy research, at Fermilab. A Functional Requirements Specification has been developed in order to establish performance criteria for the Project X complex in support of these multiple missions. This paper will describe the Functional Requirements for the Project X facility and the rationale for these requirements.

Holmes, S.D.; Henderson, S.D.; Kephart, R.; Kerby, J.; Mishra, S.; Nagaitsev, S.; Tschirhart, R.; /Fermilab

2011-03-01T23:59:59.000Z

136

General requirements. - 1926.451  

NLE Websites -- All DOE Office Websites (Extended Search)

and manual hoists shall be tested by a qualified testing laboratory. 1926.451(d)(14) Gasoline-powered equipment and hoists shall not be used on suspension scaffolds....

137

Requirements Specifications For Hybrid Systems  

E-Print Network (OSTI)

this paper is to present a formal framework for representing and reasoning about the requirements of hybrid systems. As background, the paper briefly reviews an abstract model for specifying system and software requirements, called the Four Variable Model [12], and a related requirements method, called SCR (Software Cost Reduction) [10, 1]. The paper then introduces a special discrete version of the Four Variable Model, the SCR requirements model [8] and proposes an extension of the SCR model for specifying and reasoning about hybrid systems. 2 Background

Constance Heitmeyer

1996-01-01T23:59:59.000Z

138

Pendulum detector testing device  

DOE Patents (OSTI)

A detector testing device is described which provides consistent, cost-effective, repeatable results. The testing device is primarily constructed of PVC plastic and other non-metallic materials. Sensitivity of a walk-through detector system can be checked by: (1) providing a standard test object simulating the mass, size and material content of a weapon or other contraband, (2) suspending the test object in successive positions, such as head, waist and ankle levels, simulating where the contraband might be concealed on a person walking through the detector system; and (3) swinging the suspended object through each of the positions, while operating the detector system and observing its response. The test object is retained in a holder in which the orientation of the test device or target can be readily changed, to properly complete the testing requirements. 5 figs.

Gonsalves, J.M.

1997-09-30T23:59:59.000Z

139

Pendulum detector testing device  

DOE Patents (OSTI)

A detector testing device which provides consistent, cost-effective, repeatable results. The testing device is primarily constructed of PVC plastic and other non-metallic materials. Sensitivity of a walk-through detector system can be checked by: 1) providing a standard test object simulating the mass, size and material content of a weapon or other contraband, 2) suspending the test object in successive positions, such as head, waist and ankle levels, simulating where the contraband might be concealed on a person walking through the detector system; and 3) swinging the suspended object through each of the positions, while operating the detector system and observing its response. The test object is retained in a holder in which the orientation of the test device or target can be readily changed, to properly complete the testing requirements.

Gonsalves, John M. (Modesto, CA)

1997-01-01T23:59:59.000Z

140

Qualification, Certification and Training of ETA Test Personnel  

NLE Websites -- All DOE Office Websites (Extended Search)

of the personnel involved in the activity shall be held to discuss the following: 4.4.1 Test purpose and requirements 4.4.2 Test requirements 4.4.3 Personnel requirements 4.4.4...

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Instrumentation and transformation of Java source code for automated testing with search-based testing algorithms.  

E-Print Network (OSTI)

??Search-based Software Test Data Generation is a ?eld of research treating test input generation as a search problem. Search algorithms require that an objective function… (more)

Jansen, Karsten

2010-01-01T23:59:59.000Z

142

Chesapeake Testing  

Science Conference Proceedings (OSTI)

... Send E-Mail to NVLAP at: NVLAP@nist.gov. Personal Body Armor Testing. ... 7 Ballistic Resistance of Body Armor, Section 7, Ballistic Test Methods. ...

2014-01-03T23:59:59.000Z

143

Structural Testing  

DOE Green Energy (OSTI)

Structural testing at the National Wind Technology Center (NWTC) offers many benefits to wind turbine companies. NWTC includes a new high bay large enough to test any blade expected during the next 5 years. (There are four test bays.) In 1995, NWTC developed a saphisticated data acquisition system, known as the Blade Structural Testing Real-time Acquisition Interface Network (BSTRAIN), to monitor structural testing through 24-hour continuous video surveillance. NWTC recommends ultimate static-strength and fatigue testing, with nondestructive testing in some cases (vibrational testing is covered in a separate information sheet).

NONE

1996-06-01T23:59:59.000Z

144

Validation of International Atomic Energy Agency Equipment Performance Requirements  

Science Conference Proceedings (OSTI)

Performance requirements and testing protocols are needed to ensure that equipment used by the International Atomic Energy Agency (IAEA) is reliable. Oak Ridge National Laboratory (ORNL), through the US Support Program, tested equipment to validate performance requirements protocols used by the IAEA for the subject equipment categories. Performance protocol validation tests were performed in the Environmental Effects Laboratory in the categories for battery, DC power supply, and uninterruptible power supply (UPS). Specific test results for each piece of equipment used in the validation process are included in this report.

Chiaro, PJ

2004-02-17T23:59:59.000Z

145

Handbook of Academic Requirements & Procedures  

E-Print Network (OSTI)

Handbook of Academic Requirements & Procedures for the Chemistry Graduate Program PLEASE NOTE: This version of the Handbook must be used by students who start during or after the Spring 2012 semester is a central activity. 1.2 Purpose and Content of the Handbook. A detailed account of the academic requirements

Kounaves, Samuel P.

146

Handbook of Academic Requirements & Procedures  

E-Print Network (OSTI)

Handbook of Academic Requirements & Procedures for the Chemistry Graduate Program PLEASE NOTE: This version of the Handbook can be used by students who started during or before the Fall 2011 semester activity. 1.2 Purpose and Content of the Handbook. A detailed account of the academic requirements

Kounaves, Samuel P.

147

Humidity requirements in WSCF Laboratories  

SciTech Connect

The purpose of this paper is to develop and document a position on Relative Humidity (RH) requirements in the WSCF Laboratories. A current survey of equipment vendors for Organic, Inorganic and Radiochemical laboratories indicate that 25% - 80% relative humidity may meet the environmental requirements for safe operation and protection of all the laboratory equipment.

Evans, R.A.

1994-10-01T23:59:59.000Z

148

MINIMUM SECURITY REQUIREMENTS FOR FEDERAL  

E-Print Network (OSTI)

March 2006 MINIMUM SECURITY REQUIREMENTS FOR FEDERAL INFORMATION AND INFORMATION SYSTEMS: FEDERAL INFORMATION PROCESSING STANDARD (FIPS) 200 APPROVED BY THE SECRETARY OF COMMERCE MINIMUM SECURITY REQUIREMENTS BY THE SECRETARY OF COMMERCE Shirley Radack, EditorShirley Radack, Editor Computer Security Division

149

Requirements for status for volume fuel cell manufacturing  

NLE Websites -- All DOE Office Websites (Extended Search)

Status for Volume Status for Volume Fuel Cell Manufacturing DOE Hydrogen Program, Washington, DC July 13-14, 2005 Requirements for Manufactured Fuel Cells Customer Requirements: Commercial Plant Study - Volume: 250,000 fuel stacks per year - Cost: $30/kw net Requirements for Manufactured Fuel Cells Commercial Volume Manufacturing - Material Utilization: >85% - Controlled Environments (Humidity, temperature, dust) - Environmentally safe direct and indirect materials - Hydrogen safety - Make or Buy Decisions on non/proprietary unit cell components - Integrated strategic supply chain - Design for Manufacturing, Assembly, and Service Requirements for Manufactured Fuel Cells Quality Control & Assurance - Accelerated tests and process parameters correlated to key product requirements (QFD)

150

Home: Directives, Delegations, and Requirements  

NLE Websites -- All DOE Office Websites

content. | Skip to navigation content. | Skip to navigation Site Map Contact Us Current Documents Archived Documents Entire Site only in current section Advanced Search... U.S. Department of Energy Office of Management Directives, Delegations, and Requirements Sections Home Directives Current Directives Draft Directives Archives Delegations Current Delegations Current Designations Rescinded Organizations' Assignment of Responsibility Development & Review RevCom Writers' Tools DPC Corner References News and Updates Help Personal tools You are here: Office of Management » Directives, Delegations, and Requirements Info Home Directives are the Department of Energy's primary means of establishing policies, requirements, responsibilities, and procedures for Departmental elements and contractors. Directive

151

Cyber Security Issues and Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Program (SGIG) Cyber Security Issues and Requirements Jeff Dagle November 19, 2009 Communication and Information Technology will be Central to Smart Grid Deployment Final Interim Smart Grid Roadmap, prepared by the Electric Power Research Institute (EPRI) for the National Institute of Standards and Technology (NIST) Cyber Security Requirements Associated with ARRA Projects Proposals were required to include:  Discussion of how cyber security risks will be mitigated  What criteria will be used for vendor and technology selection  Relevant cyber security standards that will be followed (or industry best practices)  How emerging smart grid cyber security standards that are currently being developed will be adopted Cyber Security Objectives for Smart

152

Motor Vehicle Parts Compliance Requirements  

Science Conference Proceedings (OSTI)

... The OVSC compliance testing program is a strong incentive for manufacturers of motor vehicles and items of motor vehicle equipment to ...

2012-09-24T23:59:59.000Z

153

Communications Requirements for Plug-in Electric Vehicles  

Science Conference Proceedings (OSTI)

This report describes a set of functional requirements for Plug-in Electric Vehicle communications in a manner that can be utilized to evaluate multiple technologies. In conjunction with another technical update focusing on test requirements for the communications technologies, this document provides a roadmap to selecting an appropriate communications technology for SAE (Society of Automotive Engineers) Standard J2931.

2010-12-31T23:59:59.000Z

154

Specific test and evaluation plan  

SciTech Connect

The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AX-B Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.

Hays, W.H.

1998-03-20T23:59:59.000Z

155

The Practice of Parking Requirements  

E-Print Network (OSTI)

the cost of the required parking is thus $20 per square foot$40 per square foot of floor area, or twice the cost in aper 1,000 square feet in a TOD, and the developer's cost of

Shoup, Donald C.

2006-01-01T23:59:59.000Z

156

land requirements | OpenEI  

Open Energy Info (EERE)

requirements requirements Dataset Summary Description This dataset is part of a larger internal dataset at the National Renewable Energy Laboratory (NREL) that explores various characteristics of large solar electric (both PV and CSP) facilities around the United States. This dataset focuses on the land use characteristics for solar facilities that are either under construction or currently in operation. Source Land-Use Requirements for Solar Power Plants in the United States Date Released June 25th, 2013 (5 months ago) Date Updated Unknown Keywords acres area average concentrating solar power csp Density electric hectares km2 land land requirements land use land-use mean photovoltaic photovoltaics PV solar statistics Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon Master Solar Land Use Spreadsheet (xlsx, 1.5 MiB)

157

Manifest requirements. RCRA Information Brief  

Science Conference Proceedings (OSTI)

Specific pretransport regulatory requirements must be met by DOE prior to shipment of hazardous waste, low-level wastes (LLW), and radioactive mixed wastes (RMW). The pretransport requirements are intended to help reduce the risk of loss or leakage of, or exposure to, hazardous wastes, LLW, and RMW during shipment; and to communicate information on potential hazards to shippers, carriers, or receivers of waste shipments, and emergency response personnel in the event of an accident, spill, or leak. These goals are accomplished through tracking of shipments, correct packaging and labeling, and communication of potential hazards. Specific requirements include manifesting, packaging, marking and labeling of waste packages, placarding of vehicles, and selecting appropriate waste transporters and shipment destinations. This Information Brief focuses on the manifesting requirements associated with domestic transport of hazardous wastes, LLW, and RMW.

Not Available

1994-04-01T23:59:59.000Z

158

Physics and detector simulation requirements  

Science Conference Proceedings (OSTI)

‘‘This document describes the computing environment needed to meet the requirements for high energy physics Monte Carlo Calculations for the simulation of Superconducting Super Collider Laboratory physics and detectors.’’ (AIP)

Computer Acquisition Working Group

1990-01-01T23:59:59.000Z

159

SofTV Viewer Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

may be required to view all features in a presentations where build steps and animations are published. (This feature can be turned off) Netscape 7.1+ Presentations created...

160

OpenEI - land requirements  

Open Energy Info (EERE)

en.openei.orgdatasetstaxonomyterm4180 en Land use requirements for ground-mounted solar power facilities. http:en.openei.orgdatasetsnode454

This dataset is part of...

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Fusion technology status and requirements  

SciTech Connect

This paper summarizes the status of fusion technology and discusses the requirements to be met in order to build a demonstration fusion plant. Strategies and programmatic considerations in pursuing engineering feasibility are also outlined.

Thomassen, K.I.

1982-01-26T23:59:59.000Z

162

Specific test and evaluation plan  

SciTech Connect

The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-A Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a ``lower tier`` document based on the W-314 Test and Evaluation Plan (TEP) This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the modifications of the AN-A valve pit. The Project Design Specifications (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the modifications to the 241-AN-A Valve Pit. The STEP will be utilized in conjunction with the TEP for verification and validation.

Hays, W.H.

1997-12-09T23:59:59.000Z

163

Renewable Energy Requirement Status: 2005  

Science Conference Proceedings (OSTI)

The potential impacts of renewable portfolio standards (RPS) and other requirements are significant for electricity generation, transmission, and distribution companies, especially for those that depend on coal and other fossil fuels to supply the power delivered to their customers. this Technical Update is to update the information presented in the previous EPRI report, Renewable Energy Requirement Status and Compliance Strategies: 2004 (1008374, December 2004). Although the assessment focuses on state ...

2006-03-30T23:59:59.000Z

164

Functional Requirements for Customer Communications  

Science Conference Proceedings (OSTI)

Customer communications infrastructures could support a wide variety of useful utility operations and industry-wide applications. However, these systems will require a substantial investment, which necessitates viewing customer communications with multiple stakeholders and applications in mind. This report describes the development of requirements for customer interface applications such as revenue metering, communications gateways, and remote equipment operations that can provide the basis for powerful ...

2002-12-18T23:59:59.000Z

165

Test Diversity  

E-Print Network (OSTI)

This paper describes a novel method for measuring the degree to which a set of test cases executes a given program in diverse ways with respect to the two fundamental programming concepts: control and data. Test Diversity is a method for measuring the variety of software control flow and data flow, comprising of four new measures: conditional diversity, data diversity, standard deviation of diversity, and test orthogonality. These closely-related measures could be used to evaluate the test effectiveness and the test-effort distribution of a test suite. The Diversity Analyzer is a novel industrial-strength testing tool that can currently perform diversity analysis on software written in C/C++/C#/VB in Windows and.NET environments. The Diversity Analyzer is used to evaluate the fault-detection effectiveness of Test Diversity on various types of industrial projects. Key Words: testing tools, verification, theory, experimentation, conditional diversity, data diversity, standard deviation,

Borislav Nikolik

2006-01-01T23:59:59.000Z

166

RADIOACTIVE MATERIAL PACKAGING TORQUE REQUIREMENTS COMPLIANCE  

Science Conference Proceedings (OSTI)

Shipping containers used to transport radioactive material (RAM) in commerce employ a variety of closure mechanisms. Often, these closure mechanisms require a specific amount of torque be applied to a bolt, nut or other threaded fastener. It is important that the required preload is achieved so that the package testing and analysis is not invalidated for the purpose of protecting the public. Torque compliance is a means of ensuring closure preload, is a major factor in accomplishing the package functions of confinement/containment, sub-criticality, and shielding. This paper will address the importance of applying proper torque to package closures, discuss torque value nomenclature, and present one methodology to ensure torque compliance is achieved.

Watkins, R.; Leduc, D.

2011-03-24T23:59:59.000Z

167

Gas Test Loop Booster Fuel Hydraulic Testing  

SciTech Connect

The Gas Test Loop (GTL) project is for the design of an adaptation to the Advanced Test Reactor (ATR) to create a fast-flux test space where fuels and materials for advanced reactor concepts can undergo irradiation testing. Incident to that design, it was found necessary to make use of special booster fuel to enhance the neutron flux in the reactor lobe in which the Gas Test Loop will be installed. Because the booster fuel is of a different composition and configuration from standard ATR fuel, it is necessary to qualify the booster fuel for use in the ATR. Part of that qualification is the determination that required thermal hydraulic criteria will be met under routine operation and under selected accident scenarios. The Hydraulic Testing task in the GTL project facilitates that determination by measuring flow coefficients (pressure drops) over various regions of the booster fuel over a range of primary coolant flow rates. A high-fidelity model of the NW lobe of the ATR with associated flow baffle, in-pile-tube, and below-core flow channels was designed, constructed and located in the Idaho State University Thermal Fluids Laboratory. A circulation loop was designed and constructed by the university to provide reactor-relevant water flow rates to the test system. Models of the four booster fuel elements required for GTL operation were fabricated from aluminum (no uranium or means of heating) and placed in the flow channel. One of these was instrumented with Pitot tubes to measure flow velocities in the channels between the three booster fuel plates and between the innermost and outermost plates and the side walls of the flow annulus. Flow coefficients in the range of 4 to 6.5 were determined from the measurements made for the upper and middle parts of the booster fuel elements. The flow coefficient for the lower end of the booster fuel and the sub-core flow channel was lower at 2.3.

Gas Test Loop Hydraulic Testing Staff

2006-09-01T23:59:59.000Z

168

Ex H (Rev. 7) Exhibit H Quality Assurance Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Ex H (Rev. 7) Exhibit H Quality Assurance Requirements Ex H (Rev. 7) Exhibit H Quality Assurance Requirements Dated: 3-25-13 Subcontract No. 241314 Page 1 of 6 EXHIBIT "H" QUALITY ASSURANCE REQUIREMENTS TABLE OF CONTENTS QC Title Page QC-02 DESIGN/CHANGE CONTROL FOR SUBCONTRACTOR PROVIDED DESIGN (May 2008) . 2 QC-06 CERTIFICATE OF CONFORMANCE (Standard) (May 2012) .................................................. 2 QC-07 MANUFACTURING, INSPECTION AND TEST PROCEDURES (Jun 2011) ........................... 2 QC-08 INSPECTION, EXAMINATION, AND TEST REPORTS (Sept 2011) ....................................... 2 QC-11 ENGINEERING DRAWINGS (Sept 2011) ................................................................................. 2

169

Rough Ride Test Procedure  

NLE Websites -- All DOE Office Websites (Extended Search)

NTP005 NTP005 Revision 2 Effective December 1, 2004 Electric Vehicle Rough Road Course Test Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Ryan Harkins Approved by: _________________________________________________ Date: _______________ Donald B. Karner ©2004 Electric Transportation Applications All Rights Reserved Procedure ETA-NTP005 Revision 2 2 TABLE OF CONTENTS 1.0 Objectives 3 2.0 Purpose 3 3.0 Documentation 3 4.0 Initial Conditions and Prerequisites 4 5.0 Testing Activity Requirements 6 6.0 Glossary 12 7.0 References 14 Appendices Appendix A - Electric Vehicle Rough Road Test Data Sheet 15

170

Thermal test options  

SciTech Connect

Shipping containers for radioactive materials must be qualified to meet a thermal accident environment specified in regulations, such at Title 10, Code of Federal Regulations, Part 71. Aimed primarily at the shipping container design, this report discusses the thermal testing options available for meeting the regulatory requirements, and states the advantages and disadvantages of each approach. The principal options considered are testing with radiant heat, furnaces, and open pool fires. The report also identifies some of the facilities available and current contacts. Finally, the report makes some recommendations on the appropriate use of these different testing methods.

Koski, J.A.; Keltner, N.R.; Sobolik, K.B.

1993-02-01T23:59:59.000Z

171

QualityAssurance&Testing  

NLE Websites -- All DOE Office Websites (Extended Search)

and Testing and Testing Manufacturing Technologies The Manufacturing Science & Technology Center provides customers with manufacturing quality requirements, testing standards and specifica- tions for new product designs, including the implementation of these requirements into final product acceptance complete with documenta- tion. Technical support and procedures are fur- nished for Interagency Product Acceptance. Capabilities * Will inspect printed circuit (PC) boards, wire wrap boards, boxes, chassis, cables, racks, systems, etc. * Work from sketches or formal drawings * Review drawings and requirements * Visual inspections for layout, markings, solder joints, components, mechanical assembly, general workmanship, safety * Point-to-point continuity checks

172

OMB Requirements | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

OMB Requirements OMB Requirements OMB Requirements Acquisitions OMB Circular A-109, Acquisition of Major Systems (04-05-76) (Available in hard copy only) OMB M-04-08, Maximizing Use of SmartBuy and Avoiding Duplication of Agency Activities with with the President's 24 E-Gov Initiatives (02-25-2004) (pdf) OMB M-04-16, Software Acquisition (07-01-2004) Budget/Capital Planning OMB Circular A-11 OMB M-05-23, Improving Informational Technology (IT) Project Planning and Execution (8-04-2005) (pdf) Cyber Security & Privacy OMB M-00-07, Incorporating and Funding Security in Information Systems Investments (02-28-2000) OMB M-02-01, Guidance for Preparing and Submitting Security Plans of Action and Milestones(10-19-2001) OMB M-02-09, Reporting Instructions for the Government Information

173

RPAM & Energy Order Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

430.1C, Real Property Asset Management 430.1C, Real Property Asset Management and DOE O 430.2B, Departmental Energy, Renewable Energy and Transportation Management Requirements, Overlap & Differences Office of Engineering and Construction Management September 2009 2 10/27/2009 Energy Order & RPAM Order Requirements DOE O 430.1C - RPAM DOE O 430.2B ENERGY ORDER Energy Efficiency Water Consumption Utility Metering ESPCs & USPCs Personnel - Energy Training Environmental Management System (EMS) Real Property Performance Indicators Sustainable Buildings Facilities Information Management System (FIMS) Personnel - Certified Realty Specialists Ten Year Site Plans Sustainable & Integrated Design TEAM Executable Plans High Performance Building Plan OVERLAP Real Property

174

New Solutions Require New Thinking  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solutions Require Solutions Require New Thinking America's demand for power threatens to overburden an already congested electric system. The U.S. Department of Energy is addressing these energy challenges with innovative solutions to energy generation. Its Renewable and Distributed Systems Integration (RDSI) Program is helping to alleviate congestion, reduce greenhouse gas emissions, and improve reliability by investigating answers such as * Microgrid technologies * Distributed generation * Two-way communication systems * Demand response programs Reducing Peak Demand The RDSI program aims to reduce peak load on distribution feeders 20% by 2015. To help achieve this goal, RDSI is sponsoring demonstration projects nationwide. From California to New York, these projects are

175

Meeting Federal Energy Security Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Markel Markel SRA International Lawrence_Markel@sra.com Federal Utility Partnership Working Group Fall 2012 - October 16-17 Mobile, AL Sponsored by Alabama Power Theme Meeting energy security requirements in federal facilities provides opportunities for additional types of cooperation between utilities and the federal agencies. However, there are significant barriers to pursuing these opportunities - constraints on utilities and on federal agencies, as well as sometimes-competing objectives. Energy security encompasses sufficiency, surety, and sustainability.  Above all, energy security means having adequate power to conduct critical operations for the duration required (sufficiency).  Secondarily, and leading to sufficiency, is ensuring resilient energy supplies that are accessible when

176

Stellar Astrophysics Requirements NERSC Forecast  

NLE Websites -- All DOE Office Websites (Extended Search)

Requirements for Requirements for m461:Stellar Explosions in Three Dimensions Tomek Plewa (Florida State University) + 3 graduate students, Artur Gawryszczak (Warsaw), Konstantinos Kifonidis (Munich), Andrzej Odrzywolek (Cracow), Ju Zhang (FIT), Andrey Zhiglo (Kharkov) 1. m461: Stellar Explosions in Three Dimensions * Summarize your projects and expected scientific objectives through 2014 * Modeling and simulations of transient phenomena in stellar astrophysics driven by either radiation or thermonuclear processes * Numerical solution of a coupled system of PDEs and ODEs * Tame nonlinearity! * Our goal is to ... * Explain observed properties of exploding stellar objects * Present focus is ... * Neutrino-driven core-collapse supernova explosions * In the next 3 years we expect to ...

177

EV America Skid Test Procedure  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 Revision 2 Effective October 1, 2007 Braking Test Prepared by Electric Transportation Applications Prepared by: _______________________________ Date: _________ Roberta Brayer Approved by: _________________________________________________ Date: _______________ Donald Karner Procedure ETA-HTP06 Revision 2 i TABLE OF CONTENTS 1. Objectives 1 2. Purpose 1 3. Documentation 1 4. Initial Conditions and Prerequisites 1 5. Testing Activity Requirements 3 5.3 Dry Controlled Test 4 6. Glossary 5 7. References 7 Appendices Appendix A - Handling Pad Test Data Sheet 8

178

ALLOCATION OF REACTIVE SUPPORT REQUIREMENTS  

E-Print Network (OSTI)

the voltage setting point s kV of each bus Qk and the voltage profile for the buses c j Q . Recall that Q for these transactions so that all bus voltages meet the specified voltage profile requirements. Consequently load is locally met at the bus. In other words, we assume that at each load bus the power factor is 1

Gross, George

179

Enhanced oil recovery water requirements  

SciTech Connect

Water requirements for enhanced oil recovery (EOR) are evaluated using publicly available information, data from actual field applications, and information provided by knowledgeable EOR technologists in 14 major oil companies. Water quantity and quality requirements are estimated for individual EOR processes (steam drive; in situ combustion; and CO/sub 2/, micellar-polymer, polymer, and caustic flooding) in those states and specific geographic locations where these processes will play major roles in future petroleum production by the year 2000. The estimated quantity requirements represent the total water needed from all sources. A reduction in these quantities can be achieved by reinjecting all of the produced water potentially available for recycle in the oil recovery method. For injection water quality requirements, it is noted that not all of the water used for EOR needs to be fresh. The use of treated produced water can reduce significantly the quantities of fresh water that would be sought from other sources. Although no major EOR project to date has been abandoned because of water supply problems, competing regional uses for water, drought situations, and scarcity of high quality surface water and ground water could be impediments to certain projects in the near future.

Royce, B.; Kaplan, E.; Garrell, M.; Geffen, T.M.

1983-03-01T23:59:59.000Z

180

Science-Driven Network Requirements for ESnet  

E-Print Network (OSTI)

Neutron Source Network Requirements Six DOE laboratories arehas networking requirements which differ from many other DOEhas networking requirements which differ from many other DOE

2006-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

TESTING TECHNIQUE  

Science Conference Proceedings (OSTI)

... The cooling bath should ... When testing super-high energy level specimens ... upon the resolution of the scale or readout device at the low end and the ...

2012-10-09T23:59:59.000Z

182

Test Methods  

Science Conference Proceedings (OSTI)

... of the robot, operator control unit (OCU), payload, and batteries • Tools needed ... this test method is to quantitatively evaluate the battery capacity per ...

2010-10-05T23:59:59.000Z

183

MITG test procedure and results  

DOE Green Energy (OSTI)

Elements and modules for Radioisotope Thermoelectric Generator have been performance tested since the inception of the RTG program. These test articles seldom resembled flight hardware and often lacked adequate diagnostic instrumentation. Because of this, performance problems were not identified in the early stage of program development. The lack of test data in an unexpected area often hampered the development of a problem solution. A procedure for conducting the MITG Test was developed in an effort to obtain data in a systematic, unambiguous manner. This procedure required the development of extensive data acquisition software and test automation. The development of a facility to implement the test procedure, the facility hardware and software requirements, and the results of the MITG testing are the subject of this paper.

Eck, M.B.; Mukunda, M.

1983-01-01T23:59:59.000Z

184

Quality assurance and testing for safety systems  

Science Conference Proceedings (OSTI)

In this paper we identify special quality assurance and test requirements of software for safety systems and show that even the best currently available practices meet these requirements only at very high cost and by application of empirical ...

Herbert Hecht; Myron Hecht

1997-01-01T23:59:59.000Z

185

Quality Assurance Requirements and Description  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

QjCivilianRadioactive QjCivilianRadioactive Was'fe Management QA: QA QVALITY ASSURANCE REQUIREMENTS AND DESCRIPTION DOEIRW-0333P Revisiol1 20 Effective Date: 10-01-2008 LarrY Newman, DlrectQr Office of Quality As,surance ~~--~-_._._- Edward F. Spr at III, Di or Office of Civilian Radioactive Waste Management Date I/Jf/4t' , . - - - Date OCRWM Title: Quality Assurance Requirements and Description DOEIRW-0333P, Revision 20 Office of Civilian Radioactive Waste Management Quality Assurance Policy Page: 2 of 160 Successful implementation of the Office of Civilian Radioactive Waste Management (OCRWM) Quality Assurance (QA) program is essential for the OCRWM to carry out its mission. Our mission is to manage and dispose ofbigh-Ievel radioactive waste and spent nuclear fuel in a manner that protects health, safety, and the environment; enhances national and energy security; and merits

186

Nano-science Safety Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Nano-science Safety Requirements Effective Date 12/6/2011 Nano-science Safety Requirements Effective Date 12/6/2011 The only official copy of this file is the one on-line. Before using a printed copy, verify that it is the most current version by checking the effective date. Page 1 of 3 Prepared By: L. Stiegler Low Risk - Embedded or Fixed Nanostructures (nanomaterials, incapable as a practical matter, of becoming airborne) Ensure that fixed nanomaterials are not subjected to actions that may generate Unbound NanoParticles (UNP). * For work outside of a HEPA filtered exhaust hood: o No Mechanical stresses e.g., (grinding, scraping, or pressing). o No thermal stresses o Cover samples when practical e.g., (slide cover, Kapton tape, Mylar tape, or cellophane tape). Samples/container must be labeled if not used immediately.

187

Requirements for signaling channel authentication  

SciTech Connect

This contribution addresses requirements for ATM signaling channel authentication. Signaling channel authentication is an ATM security service that binds an ATM signaling message to its source. By creating this binding, the message recipient, and even a third party, can confidently verify that the message originated from its claimed source. This provides a useful mechanism to mitigate a number of threats. For example, a denial of service attack which attempts to tear-down an active connection by surreptitiously injecting RELEASE or DROP PARTY messages could be easily thwarted when authenticity assurances are in place for the signaling channel. Signaling channel authentication could also be used to provide the required auditing information for accurate billing which is impervious to repudiation. Finally, depending on the signaling channel authentication mechanism, end-to-end integrity of the message (or at least part of it) can be provided. None of these capabilities exist in the current specifications.

Tarman, T.D.

1995-12-11T23:59:59.000Z

188

Functional Requirements and Use Cases  

E-Print Network (OSTI)

iously also beneficial in information systems development, staging core functionality for early releases and adding features over the course of several subsequent releases. In many industries, companies produce product lines with different cost/feature variations per product in the line, and product families that include a number of product lines targeted at somewhat different markets or usage situations. What makes these product lines part of a family, are some common elements of functionality and identity. A platform-based development approach leverages this commonality, utilizing a set of reusable assets across the family. These strategies have important implications for software architecture. In particular, it is not just the functional requirements of the first product or release that must be supported by the architecture. The functional requirements of early (nearly concurrent) releases need to be explicitly taken into account. Later releases are accommodated through architectu

System Has Properties; Ruth Malan; Dana Bredemeyer

2005-01-01T23:59:59.000Z

189

Evaluate deaerator steam requirements quickly  

Science Conference Proceedings (OSTI)

Steam plant engineers frequently have to perform energy balance calculations around the deaerator to estimate the steam required to preheat and deaerate the make-up water and condensate returns. This calculation involves solving two sets of equations, one for mass and the other for energy balance. Reference to steam tables is also necessary. However, with the help of this program written in BASIC, one can arrive at the make-up water and steam requirements quickly, without referring to steam tables. This paper shows the mass and energy balance equations for the deaerator. This paper gives the program listing. An number of condensate returns can be handled. An example illustrates the use of the program.

Ganapathy, V. (ABCO Industries, Inc., Abilene, TX (US))

1991-02-01T23:59:59.000Z

190

Present and Future Computing Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

for Computational Cosmology for Computational Cosmology DES LSST Presenter: Salman Habib Argonne National Laboratory Jim Ahrens (LANL) Scott Dodelson (FNAL) Katrin Heitmann (ANL) Peter Nugent (LBNL) Anze Slosar (BNL) Risa Wechsler (SLAC) 1 Cosmic Frontier Computing Collaboration Computational Cosmology SciDAC-3 Project Ann Almgren (LBNL) Nick Gnedin (FNAL) Dave Higdon (LANL) Rob Ross (ANL) Martin White (UC Berkeley/ LBNL) Large Scale Production Computing and Storage Requirements for High Energy Physics Research A DOE Technical Program Review November 27-28, 2012

191

TEST & MOTION SIMULATION SYSTEMSSERVOTEST Tailored Solutions For Your Servohydraulic  

E-Print Network (OSTI)

TEST & MOTION SIMULATION SYSTEMSSERVOTEST SERVOTEST ACTUATORS Tailored Solutions For Your Servohydraulic Test And Motion Simulation System Requirements #12;TEST & MOTION SIMULATION SYSTEMSSERVOTEST qualified engineers · Founded in 1958 as a Consultancy to service the growing test market · International

192

Gunshot triangulation device testing  

NLE Websites -- All DOE Office Websites (Extended Search)

Gunshot triangulation device testing Gunshot triangulation device testing Report to the Fermilab Community Advisory Board, Oct. 28, 2010 The Fermilab security director outlined for the board last month a recurring problem of people shooting guns near the edges of the laboratory and bullets coming onto the site. Fermilab is installing a system to triangulate the gunshots to improve police response time. This will require a set-up calibration of two dozen gunshots during a total of 6 minutes at the laboratory site. The board was asked for recommendations about how and whom to inform of the test firing. In response to the board discussion, Fermilab plans to take the following actions:  The test firing will occur during the mid-day of a week day to minimize the number of residents

193

ACOUSTICAL TESTING SERVICES TEST METHOD ...  

Science Conference Proceedings (OSTI)

... IEC 60704-2-3 Household and similar electrical appliances - Test code for ... noise emitted and structure-borne vibration induced by small air- moving ...

2013-05-06T23:59:59.000Z

194

test | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

test test test test More Documents & Publications Software Testing Checklist February2GuidanceMemorandum.pdf Site Transition Plan Guidance...

195

Seismic Performance Requirements for WETF  

Science Conference Proceedings (OSTI)

This report develops recommendations for requirements on the Weapons Engineering Tritium Facility (WETF) performance during seismic events. These recommendations are based on fragility estimates of WETF structures, systems, and components that were developed by LANL experts during facility walkdowns. They follow DOE guidance as set forth in standards DOE-STD-1021-93, ''Natural Phenomena Hazards Performance Categorization Guidelines for Structures, Systems, and Components'' and DOE-STD-1020-94, ''Natural Phenomena Hazards Design and Evaluation Criteria for Department of Energy Facilities''. Major recommendations are that WETF institute a stringent combustible loading control program and that additional seismic bracing and anchoring be provided for gloveboxes and heavy equipment.

Hans Jordan

2001-01-01T23:59:59.000Z

196

Modal testing the EOLE  

DOE Green Energy (OSTI)

Modal testing an immense and flexible wind turbine poses a number of problems. It requires innovative excitation techniques since the modal frequencies of this type of structure are quite low. Also, substantial energy must be input to the structure to obtain reasonable levels of response. In this paper, the results of the modal test of the 110 m tall EOLE wind turbine are presented which had a number of modal frequencies below 1.0 Hz. Step-relaxation and wind were used to excite the structure. 5 refs., 14 figs., 2 tabs.

Carne, T.G.; Lauffer, J.P.; Gomez, A.J.

1987-01-01T23:59:59.000Z

197

Outlook and Related Information Requirements  

E-Print Network (OSTI)

This procedure provides the steps required for market participants to submit the information required for the 18-Month Outlook, and specifies the information to be contained in the Outlook. Public Disclaimer The posting of documents on this Web site is done for the convenience of market participants and other interested visitors to the IESO Web site. Please be advised that, while the IESO attempts to have all posted documents conform to the original, changes can result from the original, including changes resulting from the programs used to format the documents for posting on the Web site as well as from the programs used by the viewer to download and read the documents. The IESO makes no representation or warranty, express or implied, that the documents on this Web site are exact reproductions of the original documents listed. In addition, the documents and information posted on this Web site are subject to change. The IESO may revise, withdraw or make final these materials at any time at its sole discretion without further notice. It is solely your responsibility to ensure that you are using up-to-date documents and information.

unknown authors

2001-01-01T23:59:59.000Z

198

Functional requirements for gas characterization system computer software  

DOE Green Energy (OSTI)

This document provides the Functional Requirements for the Computer Software operating the Gas Characterization System (GCS), which monitors the combustible gasses in the vapor space of selected tanks. Necessary computer functions are defined to support design, testing, operation, and change control. The GCS requires several individual computers to address the control and data acquisition functions of instruments and sensors. These computers are networked for communication, and must multi-task to accommodate operation in parallel.

Tate, D.D.

1996-01-01T23:59:59.000Z

199

Test plan  

U.S. Energy Information Administration (EIA)

3.0 TEST PLAN METHODOLOGY 8. 3.1 Assumptions 8. 3.2 Methodology 8. 4.0 COMMENTS ON INITIAL VIEW OF THE DATA 16 1.0 INTRODUCTION. EIA tasked Allied ...

200

Biomonitoring test procedures and biological criteria  

SciTech Connect

The Water Environment Federation recently issued a special publication, Biomonitoring in the Water Environment. In this paper, the authors highlight the contents of the chapter 3, Biomonitoring Test Procedures, identify current trends in test procedures and introduce the concept of biological criteria (biocriteria). The book chapter (and this paper) focuses on freshwater and marine chronic and acute toxicity tests used in the National Pollutant Discharge Elimination System (NPDES) permits program to identify effluents and receiving waters containing toxic materials in acutely or chronically toxic concentrations. The two major categories of toxicity tests include acute tests and chronic tests. The USEPA chronic tests required in NPDEs permits have been shortened to 7 days by focusing on the most sensitive life-cycle stages; these tests are often referred to as short-term chronic tests. The type of test(s) required depend on NPDES permit requirements, objectives of the test, available resources, requirements of the test organisms, and effluent characteristics such as variability in flow or toxicity. The permit writer will determine the requirements for toxicity test(s) by considering such factors as dilution, effluent variability, and exposure variability. Whether the required test is acute or chronic, the objective of the test is to estimate the safe or no effect concentration which is defined as the concentration which will permit normal propagation of fish and other aquatic life in the receiving waters. In this paper, the authors review the types of toxicity tests, the commonly used test organisms, and the uses of toxicity test data. In addition, they briefly describe research on new methods and the use of biological criteria.

Kszos, L.A. [Oak Ridge National Lab., TN (United States); Lipschultz, M.J. [City of Las Vegas, NV (United States); Foster, W.E. [Saint Mary`s Coll., Winona, MN (United States)

1997-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Automated Demand Response Tests  

Science Conference Proceedings (OSTI)

This report includes assessments and test results of four end-use technologies, representing products in the residential, commercial, and industrial sectors, each configured to automatically receive real-time pricing information and critical peak pricing (CPP) demand response (DR) event notifications. Four different vendors were asked to follow the interface requirements set forth in the Open Automated Demand Response (OpenADR) standard that was introduced to the public in 2008 and currently used in two ...

2008-12-22T23:59:59.000Z

202

Automated Demand Response Tests  

Science Conference Proceedings (OSTI)

This report, which is an update to EPRI Report 1016082, includes assessments and test results of four end-use vendor technologies. These technologies represent products in the residential, commercial, and industrial sectors, each configured to automatically receive real-time pricing information and critical peak pricing (CPP) demand response (DR) event notifications. Four different vendors were asked to follow the interface requirements set forth in the Open Automated Demand Response (OpenADR) Communicat...

2009-03-30T23:59:59.000Z

203

Length requirements for numerical-relativity waveforms  

E-Print Network (OSTI)

One way to produce complete inspiral-merger-ringdown gravitational waveforms from black-hole-binary systems is to connect post-Newtonian (PN) and numerical-relativity (NR) results to create "hybrid" waveforms. Hybrid waveforms are central to the construction of some phenomenological models for GW search templates, and for tests of GW search pipelines. The dominant error source in hybrid waveforms arises from the PN contribution, and can be reduced by increasing the number of NR GW cycles that are included in the hybrid. Hybrid waveforms are considered sufficiently accurate for GW detection if their mismatch error is below 3% (i.e., a fitting factor about 0.97). We address the question of the length requirements of NR waveforms such that the final hybrid waveforms meet this requirement, considering nonspinning binaries with q = M_2/M_1 \\in [1,4] and equal-mass binaries with \\chi = S_i/M_i^2 \\in [-0.5,0.5]. We conclude that for the cases we study simulations must contain between three (in the equal-mass nonspinning case) and ten (the \\chi = 0.5 case) orbits before merger, but there is also evidence that these are the regions of parameter space for which the least number of cycles will be needed.

Mark Hannam; Sascha Husa; Frank Ohme; P. Ajith

2010-08-17T23:59:59.000Z

204

Length requirements for numerical-relativity waveforms  

E-Print Network (OSTI)

One way to produce complete inspiral-merger-ringdown gravitational waveforms from black-hole-binary systems is to connect post-Newtonian (PN) and numerical-relativity (NR) results to create ``hybrid'' waveforms. Hybrid waveforms are central to the construction of some phenomenological models for GW search templates, and for tests of GW search pipelines. The dominant error source in hybrid waveforms arises from the PN contribution, and can be reduced by increasing the number of NR GW cycles that are included in the hybrid. Hybrid waveforms are considered sufficiently accurate for GW detection if their mismatch error is below 3% (i.e., a fitting factor about 0.97). We address the question of the length requirements of NR waveforms such that the final hybrid waveforms meet this requirement, considering nonspinning binaries with q = M_2/M_1 \\in [1,4] and equal-mass binaries with \\chi = S_i/M_i^2 \\in [-0.5,0.5]. We conclude that for the cases we study simulations must contain between three (in the equal-mass nonsp...

Hannam, Mark; Ohme, Frank; Ajith, P

2010-01-01T23:59:59.000Z

205

Military power requirements and backup power considerations  

Science Conference Proceedings (OSTI)

All US Air Force (USAF) facilities have certain critical power requirements that must be met in order to carry out their mission successfully. Internal USAF studies have shown that the mission can degrade precipitously as the available power decreases below the mission critical level. Now, more than ever before, the military and private industry are finding that certain functions, such as automated data processing and automated process control, respond catastrophically to power reductions. Furthermore, increased reliance on electrical power means, in the case of the Air Force, that critical power requirements are anticipated to increase by half over the next 15 yr. For these reasons and others, the USAF is investigating several means of improving the availability of electric power under adverse conditions above that which can be provided by an off-base supplier. Among the approaches to this problem being pursued at this time are a program to improve all sorts of generator sets on a service-wide basis and the Multimegawatt Terrestrial Power (MTP) Program, which is pursuing the design and testing of a small dedicated nuclear power source to provide critical mission power. The purpose of this paper is to provide some insight into some of the issues associated with USAF power programs.

Botts, T.E.

1986-01-01T23:59:59.000Z

206

Microsoft Word - Requirements 0819.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Studying the ) DOE-HQ-2009-0003-0819 Studying the ) DOE-HQ-2009-0003-0819 Communications Requirements of Electric ) (Noticed May 11, 2010) Utilities to Inform Federal Smart Grid Policy ) ) Comments of San Diego Gas & Electric Company San Diego Gas & Electric Company ("SDG&E") files these comments in response to the above-enumerated Request for Information noticed by the Department on May 11, 2010. SDG&E is a regulated public electric and gas utility operating pursuant to authorities granted to it by the Federal Energy Regulatory Commission and the State of California. SDG&E serves 3.4 million consumers in the San Diego and southern Orange County areas of California via 1.4 million electric meters and 830,000 gas meters. SDG&E's sister company, the Southern California Gas

207

Testing technology  

SciTech Connect

This bulletin from Sandia National Laboratories presents current research highlights in testing technology. Ion microscopy offers new nondestructive testing technique that detects high resolution invisible defects. An inexpensive thin-film gauge checks detonators on centrifuge. Laser trackers ride the range and track helicopters at low-level flights that could not be detected by radar. Radiation transport software predicts electron/photon effects via cascade simulation. Acoustic research in noise abatement will lead to quieter travelling for Bay Area Rapid Transport (BART) commuters.

Not Available

1993-10-01T23:59:59.000Z

208

Analytical Requirements for Petroleum Contaminated Soils  

E-Print Network (OSTI)

Analytical Requirements for Petroleum Contaminated Soils According to 20 NMAC 9.1.704 704. REQUIRED), or other applicable statutes. Page 1 of 1Analytical Requirements for Petroleum Contaminated Soils 4

209

A Requirements Analyst's Apprentice: A Proposal  

E-Print Network (OSTI)

The Requirements Analyst's APprentice (RAAP) partially automates the modeling process involved in creating a software requirement. It uses knowledge of the specific domain and general experience regarding software requirements ...

Reubenstein, Howard

210

Test Automation Ant JUnit Test Automation  

E-Print Network (OSTI)

Test Automation Ant JUnit Test Automation Mohammad Mousavi Eindhoven University of Technology, The Netherlands Software Testing 2012 Mousavi: Test Automation #12;Test Automation Ant JUnit Outline Test Automation Ant JUnit Mousavi: Test Automation #12;Test Automation Ant JUnit Why? Challenges of Manual Testing

Mousavi, Mohammad

211

Advanced Vehicle Testing Activity: Energy Storage Testing  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Storage Testing to someone by E-mail Share Advanced Vehicle Testing Activity: Energy Storage Testing on Facebook Tweet about Advanced Vehicle Testing Activity: Energy...

212

Supervisory Training Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supervisory Training Requirements Supervisory Training Requirements Supervisory Training Requirements The Office of Learning and Workforce Development has developed an inventory of training and developmental activities that will meet the supervisory training requirements. The DOE courses, Supervisory Essentials and Navigating the Federal Hiring Process are required to fulfill the first 40-hour of the probationary period mandatory training requirement for new supervisors. All other courses listed in the training framework are suggested to meet overall continual learning requirements. Supervisory Training Requirements More Documents & Publications EM's Development Program for New Managers/Supervisors Presentation DOE F 3315.1 Supervisory - Non-Supervisory Employee Performance Management and

213

Cold vacuum drying facility design requirements  

SciTech Connect

This document provides the detailed design requirements for the Spent Nuclear Fuel Project Cold Vacuum Drying Facility. Process, safety, and quality assurance requirements and interfaces are specified.

IRWIN, J.J.

1999-07-01T23:59:59.000Z

214

ALS Beamline Design Requirements - Revision 1  

E-Print Network (OSTI)

the beamline including: • Electrical power requirements e.at the ALS include: • Electrical power: 480VAC, 208VAC, 120terminations, and electrical power requirements. Beamline

Heimann, Phil

2010-01-01T23:59:59.000Z

215

Alternative Fuels Data Center: Emissions Reduction Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Emissions Reduction Emissions Reduction Requirements to someone by E-mail Share Alternative Fuels Data Center: Emissions Reduction Requirements on Facebook Tweet about Alternative Fuels Data Center: Emissions Reduction Requirements on Twitter Bookmark Alternative Fuels Data Center: Emissions Reduction Requirements on Google Bookmark Alternative Fuels Data Center: Emissions Reduction Requirements on Delicious Rank Alternative Fuels Data Center: Emissions Reduction Requirements on Digg Find More places to share Alternative Fuels Data Center: Emissions Reduction Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Emissions Reduction Requirements Recognizing the impact of carbon-emitting fuels on climate change and to

216

Supervisory Training Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supervisory Training Requirements Supervisory Training Requirements The Office of Learning and Workforce Development has developed an inventory of training and developmental...

217

Federal Energy Management Program: Federal Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Federal Requirements to someone by E-mail Share Federal Energy Management Program: Federal Requirements on Facebook Tweet about Federal Energy Management Program: Federal...

218

Federal Energy Management Program: Energy Management Requirements...  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Management Requirements by Subject to someone by E-mail Share Federal Energy Management Program: Energy Management Requirements by Subject on Facebook Tweet about Federal...

219

National Bridge Inventory Record Data Submission Requirement...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Bridge Inventory Record Data Submission Requirement National Bridge Inventory Record Data Submission Requirement 2011.09.02 OECM-NBI Record Data Submission Req.pdf More...

220

NERSC/DOE HEP Requirements Workshop Logistics  

NLE Websites -- All DOE Office Websites (Extended Search)

at NERSC HPC Requirements Reviews Requirements for Science: Target 2014 High Energy Physics (HEP) Logistics Workshop Logistics Workshop Location Hilton Washington...

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Alternative Fuels Data Center: Petroleum Reduction Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Petroleum Reduction Petroleum Reduction Requirements to someone by E-mail Share Alternative Fuels Data Center: Petroleum Reduction Requirements on Facebook Tweet about Alternative Fuels Data Center: Petroleum Reduction Requirements on Twitter Bookmark Alternative Fuels Data Center: Petroleum Reduction Requirements on Google Bookmark Alternative Fuels Data Center: Petroleum Reduction Requirements on Delicious Rank Alternative Fuels Data Center: Petroleum Reduction Requirements on Digg Find More places to share Alternative Fuels Data Center: Petroleum Reduction Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Petroleum Reduction Requirements The Wisconsin Department of Administration's fleet management policy

222

Alternative Fuels Data Center: Vehicle Registration Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Vehicle Registration Vehicle Registration Requirement to someone by E-mail Share Alternative Fuels Data Center: Vehicle Registration Requirement on Facebook Tweet about Alternative Fuels Data Center: Vehicle Registration Requirement on Twitter Bookmark Alternative Fuels Data Center: Vehicle Registration Requirement on Google Bookmark Alternative Fuels Data Center: Vehicle Registration Requirement on Delicious Rank Alternative Fuels Data Center: Vehicle Registration Requirement on Digg Find More places to share Alternative Fuels Data Center: Vehicle Registration Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Vehicle Registration Requirement Motor vehicle registration applicants must provide proof of compliance with

223

Renewable Generation Requirement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Generation Requirement Renewable Generation Requirement Eligibility Investor-Owned Utility Retail Supplier Savings For Bioenergy Buying & Making Electricity Water Solar Heating &...

224

Studying the Communications Requirements of Electric Utilities...  

NLE Websites -- All DOE Office Websites (Extended Search)

Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policies- Public Meeting Studying the Communications Requirements of Electric Utilities...

225

Communications Requirements of Smart Grid Technologies | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

Communications Requirements of Smart Grid Technologies Communications Requirements of Smart Grid Technologies This report sets forth the findings of the U.S. Department of Energy...

226

SmartAmerica Challenge White paper requirement  

Science Conference Proceedings (OSTI)

SmartAmerica Challenge. CPS Test Bed and Activities descriptions. We need your ideas and participation. CPS Test bed ...

2013-12-11T23:59:59.000Z

227

ROCKY MOUNTAIN OILFIELD TESTING CENTER PROJECT TEST RESULTS  

NLE Websites -- All DOE Office Websites (Extended Search)

AJUST A PUMP BEAM PUMPING UNIT AJUST A PUMP BEAM PUMPING UNIT FEBRUARY 19, 1997 FC9532 / 95EC1 ROCKY MOUNTAIN OILFIELD TESTING CENTER AJUST A PUMP TEST Rosemond Manufacturing, Inc. (RMI) Prepared for: INDUSTRY PUBLICATION Prepared by: MICHAEL J. TAYLOR Project Manager February 19, 1997 650200/551107:9532 ABSTRACT The Rocky Mountain Oilfield Testing Center (RMOTC) conducted a test of a Model-2000 Ajust A Pump system at the Naval Petroleum Reserve No. 3 (NPR-3). Rosemond Manufacturing, Inc. (RMI) manufactures compact beam-pumping units that incorporate energy-efficient gear boxes. The equipment is designed to reduce operating costs and minimize maintenance labor. This report documents the equipment performance and the results of the Ajust A Pump test. The purpose of the test was to demonstrate claims of energy efficiency and reduced labor requirements. The test showed

228

Subsurface contamination focus area technical requirements. Volume II  

Science Conference Proceedings (OSTI)

This is our vision, a vision that replaces the ad hoc or {open_quotes}delphi{close_quotes} method which is to get a group of {open_quotes}experts{close_quotes} together and make decisions based upon opinion. To fulfill our vision for the Subsurface Contaminants Focus Area (SCFA), it is necessary to generate technical requirements or performance measures which are quantitative or measurable. Decisions can be supported if they are based upon requirements or performance measures which can be traced to the origin (documented) and are verifiable, i.e., prove that requirements are satisfied by inspection (show me), demonstration, analysis, monitoring, or test. The data from which these requirements are derived must also reflect the characteristics of individual landfills or plumes so that technologies that meet these requirements will necessarily work at specific sites. Other subjective factors, such as stakeholder concerns, do influence decisions. Using the requirements as a basic approach, the SCFA can depend upon objective criteria to help influence the areas of subjectivity, like the stakeholders. In the past, traceable requirements were not generated, probably because it seemed too difficult to do so. There are risks that the requirements approach will not be accepted because it is new and represents a departure from the historical paradigm.

Nickelson, D.; Nonte, J.; Richardson, J.

1996-10-01T23:59:59.000Z

229

HEAVY-DUTY VEHICLE IN USE EMISSION PERFORMANCE  

DOE Green Energy (OSTI)

Engines for heavy-duty vehicles are emission certified by running engines according to specified load pattern or duty cycle. In the US, the US Heavy-Duty Transient cycle has been in use already for a number of years, and Europe is, according to the requirements of the Directive 1999/96/EC gradually switching to transient-type testing. Evaluating the in-use emission performance of heavy-duty vehicles presents a problem. Taking engines out of vehicles for engine dynamometer testing is difficult and costly. In addition, engine dynamometer testing does not take into account the properties of the vehicle itself (i.e. mass, transmission etc.). It is also debatable, how well the standardized duty cycles reflect real-life -driving patterns. VTT Processes has recently commissioned a new emission laboratory for heavy-duty vehicles. The facility comprises both engine test stand and a fully transient heavy-duty chassis dynamometer. The roller diameter of the dynamometer is 2.5 meters. Regulated emissions are measured using a full-flow CVS system. The HD vehicle chassis dynamometer measurements (emissions, fuel consumption) has been granted accreditation by the Centre of Metrology and Accreditation (MIKES, Finland). A national program to generate emission data on buses has been set up for the years 2002-2004. The target is to generate emission factors for some 50 different buses representing different degree of sophistication (Euro 1 to Euro5/EEV, with and without exhaust gas aftertreatment), different fuel technologies (diesel, natural gas) and different ages (the effect of aging). The work is funded by the Metropolitan Council of Helsinki, Helsinki City Transport, The Ministry of Transport and Communications Finland and the gas company Gasum Oy. The International Association for Natural Gas Vehicles (IANGV) has opted to buy into the project. For IANGV, VTT will deliver comprehensive emission data (including particle size distribution and chemical and biological characterization of particles) for up-to-date diesel and natural gas vehicles. The paper describes the methodology used for the measurements on buses, the test matrix and some preliminary emission data on both regulated and unregulated emissions.

Nylund, N; Ikonen, M; Laurikko, J

2003-08-24T23:59:59.000Z

230

test | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

test test test test More Documents & Publications 2009 ECR FINAL REPORT 2010 Final ECR 2008 Report Environmental Conflict Resolution...

231

Fuels from microalgae: Technology status, potential, and research requirements  

DOE Green Energy (OSTI)

Although numerous options for the production of fuels from microalgae have been proposed, our analysis indicates that only two qualify for extensive development - gasoline and ester fuel. In developing the comparisons that support this conclusion, we have identified the major areas of microalgae production and processing that require extensive development. Technology success requires developing and testing processes that fully utilize the polar and nonpolar lipids produced by microalgae. Process designs used in these analyses were derived from fragmented, preliminary laboratory data. These results must be substantiated and integrated processes proposed, tested, and refined to be able to evaluate the commercial feasibility from microalgae. The production of algal feedstocks for processing to gasoline or ester fuel requires algae of high productivity and high lipid content that efficiently utilize saline waters. Species screening and development suggest that algae can achieve required standards taken individually, but algae that can meet the integrated requirements still elude researchers. Effective development of fuels from microalgae technology requires that R and D be directed toward meeting the integrated standards set out in the analysis. As technology analysts, it is inappropriate for us to dictate how the R and D effort should proceed to meet these standards. We end our role by noting that alternative approaches to meeting the feasibility targets have been identified, and it is now the task of program managers and scientists to choose the appropriate approach to assure the greatest likelihood of realizing a commercially viable technology. 70 refs., 39 figs., 35 tabs.

Neenan, B.; Feinberg, D.; Hill, A.; McIntosh, R.; Terry, K.

1986-08-01T23:59:59.000Z

232

DESIGN AND CONSTRUCTION OF HEAT EXCHANGER TEST STAND WITH INITIAL TEST RESULTS.  

E-Print Network (OSTI)

??Continual development of internal combustion engines requires greater performance from liquid coolants and heat exchangers to maintain optimal temperature. For the purpose of experimental testing… (more)

Albrecht, Daniel David

2009-01-01T23:59:59.000Z

233

CC Pressure Test  

SciTech Connect

The inner vessel heads including bypass and beam tubes had just been welded into place and dye penetrant checked. The vacuum heads were not on at this time but the vacuum shell was on covering the piping penetrating into the inner vessel. Signal boxes with all feed through boards, the instrumentation box, and high voltage boxes were all installed with their pump outs capped. All 1/4-inch instrumentation lines were terminated at their respective shutoff valves. All vacuum piping used for pumping down the inner vessel was isolated using o-ring sealed blind flanges. PV215A (VAT Series 12), the 4-inch VRC gate valve isolating the cyropump, and the rupture disk had to be removed and replaced with blind flanges before pressurizing due to their pressure limitations. Stresses in plates used as blind flanges were checked using Code calcualtions. Before the CC test, vacuum style blanks and clamps were hydrostatically pressure tested to 150% of the maximum test pressure, 60 psig. The Code inspector and Research Division Safety had all given their approval to the test pressure and procedure prior to filling the vessel with argon. The test was a major success. Based on the lack of any distinguishable pressure drop indicated on the pressure gages, the vessel appeared to be structurally sound throughout the duration of the test (approx. 3 hrs.). A major leak in the instrumentation tubing was discovered at half of the maximum test pressure and was quickly isolated by crimping and capping with a compression fitting. There were some slight deviations in the actual procedure used. The 44 psig relief valve located just outside the cleanroom had to be capped until the pressure in the vessel indicated 38 psi. This was to allow higher supply pressures and hence, higher flows through the pressurizing line. Also, in order to get pressure readings at the cryostat without exposing any personnel to the potentially dangerous stored energy near the maximum test pressure, a camera was installed at the top of the vessel to view the indicator mounted there. The monitor was viewed at the ante room adjacent to the cleanroom. The holding pressure of 32 psig (4/5 of the maximum test pressure) was only maintained for about 20 minutes instead of the half hour recommendation in the procedure. We felt that this was sufficient time to Snoop test and perform the pressure drop test. After the test was completed, the inspector for CBI Na-Con and the Research Divison Safety Officer signed all of required documentation.

Dixon, K.; /Fermilab

1990-07-12T23:59:59.000Z

234

Microgrid Testing  

Science Conference Proceedings (OSTI)

With the publication of IEEE 1574.4 Guide for Design, Operation, and Integration of Distributed Resource Island Systems with Electric Power Systems, there is an increasing amount of attention on not only the design and operations of microgrids, but also on the proper operation and testing of these systems. This standard provides alternative approaches and good practices for the design, operation, and integration of microgrids. This includes the ability to separate from and reconnect to part of the utility grid while providing power to the islanded power system. This presentation addresses the industry need to develop standardized testing and evaluation procedures for microgrids in order to assure quality operation in the grid connected and islanded modes of operation.

Shirazi, M.; Kroposki, B.

2012-01-01T23:59:59.000Z

235

Inspection system performance test procedure  

SciTech Connect

This procedure establishes requirements to administer a performance demonstration test. The test is to demonstrate that the double-shell tank inspection system (DSTIS) supplied by the contractor performs in accordance with the WHC-S-4108, Double-Shell Tank Ultrasonic Inspection Performance Specification, Rev. 2-A, January, 1995. The inspection system is intended to provide ultrasonic (UT) and visual data to determine integrity of the Westinghouse Hanford Company (WHC) site underground waste tanks. The robotic inspection system consists of the following major sub-systems (modules) and components: Mobile control center; Deployment module; Cable management assembly; Robot mechanism; Ultrasonic testing system; Visual testing system; Pneumatic system; Electrical system; and Control system.

Jensen, C.E.

1995-01-17T23:59:59.000Z

236

NUCLEAR ENGINEERING & RADIOLOG SC BSE Plan Requirements  

E-Print Network (OSTI)

NUCLEAR ENGINEERING & RADIOLOG SC BSE Plan Requirements 1 Campus: UMICH RG = Requirement Group Career: UENG RQ = Requirement Program: LN = Line Plan: 6000BSE RG 6412 NUCLEAR ENGINEERING no exceptions here) RG 6521 NUCLEAR ENGINEERING AND RADIOLOGICAL SCIENCES RESIDENCY, GPA REQUIREMENTS Effective

Shyy, Wei

237

A systematic review of security requirements engineering  

Science Conference Proceedings (OSTI)

One of the most important aspects in the achievement of secure software systems in the software development process is what is known as Security Requirements Engineering. However, very few reviews focus on this theme in a systematic, thorough and unbiased ... Keywords: Requirements engineering, Secure development, Security, Security engineering, Security requirements, Security requirements engineering, Systematic review

Daniel Mellado; Carlos Blanco; Luis E. Sánchez; Eduardo Fernández-Medina

2010-06-01T23:59:59.000Z

238

The Access Almanac: Solar Parking Requirements  

E-Print Network (OSTI)

throughout the city. In California, one solar-coveredcommuters’ electric cars. California requires that, by 2025,

Shoup, Donald

2012-01-01T23:59:59.000Z

239

200 Area treated effluent disposal facility operational test specification  

Science Conference Proceedings (OSTI)

This document identifies the test specification and test requirements for the 200 Area Treated Effluent Disposal Facility (200 Area TEDF) operational testing activities. These operational testing activities, when completed, demonstrate the functional, operational and design requirements of the 200 Area TEDF have been met.

Crane, A.F.

1995-01-12T23:59:59.000Z

240

200 Area treated effluent disposal facility operational test specification  

Science Conference Proceedings (OSTI)

This document identifies the test specification and test requirements for the 200 Area Treated Effluent Disposal Facility (200 Area TEDF) operational testing activities. These operational testing activities, when completed, demonstrate the functional, operational and design requirements of the 200 Area TEDF have been met.

Crane, A.F.

1995-02-02T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Operational test report for LERF Basin 242AL-44 integrity test  

SciTech Connect

This operational test report documents the results of LERF operational testing per operational test procedure (OTP) TFPE-WP-0231, ``LERF Basin Integrity Testing.`` The primary purpose of the OTP was to resolve test exceptions generated as a result of TFPE-WP-0184. The TOP was prepared and performed in accordance with WHC-SD-534-OTP-002, ``Operational Test Plan for the 242-A Evaporator Upgrades and the Liquid Effluent Retention Facility.`` WHC-S-086, ``Specification for Operational Testing of the Liquid Effluent Retention Facility, Basin Integrity Testing,`` identified the test requirements and acceptance criteria. The completed, signed-off test procedure is contained in Appendix A. The test log is contained in Appendix B. Section 2.1 describes all the test exceptions written during performance of the Operational Test Procedure. The test revisions generated during the testing are discussed in Section 2.2. The dispositioned test exception forms are contained in Appendix C.

Galioto, T.M.

1994-11-08T23:59:59.000Z

242

Smokeless Gasoline Fire Test  

SciTech Connect

As a result of the recent concern by environmentalists, the hypothetical accident thermal test can no longer be performed by simply burning gasoline in an open pit. The uncontrolled open pit technique creates thick, dense, black clouds of smoke which are not permitted by local authorities. This paper deals with the design of the fire test facility and the techniques used to eliminate the smoke plume. The techniques include the addition of excess air to the fire in combination with a spray of water mist near the fuel surface. The excess air technique has been used successfully in an experimental setup; it was found that the temperature could be controlled in the neighborhood of the required 1475 degrees F environment and the smoke could be reduced to very low levels. The water spray technique has been successfully used by others in similar applications and, on completion of a permanent fire test facility at Mound Laboratory (anticipated July, 1974), test results will be available. The water is believed to interact with the combustion reaction to provide more complete combustion. The permanent facility will be a 10 x 10 ft cement block enclosure lined with firebrick. It will be 8 ft high on three sides and 4 ft high on one side to provide for observation of the test. A 5000 gal underground tank provides storage for the aviation gasoline which is gravity fed to the fire.

Williams, H.; Griffin, J. F.

1974-04-01T23:59:59.000Z

243

The emergence of requirements networks: the case for requirements inter-dependencies  

Science Conference Proceedings (OSTI)

Do system requirements depend on each other? Or, do system requirements live in an isolated world of their own and act independently by being completely oblivious to the presence of other requirements? Since a singular requirement does ...

Vishwajeet Kulshreshtha; John Boardman; Dinesh Verma

2012-10-01T23:59:59.000Z

244

DOE Challenge Home National Program Requirements (Rev. 03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Program Requirements (Rev. 03) National Program Requirements (Rev. 03) April 17, 2013 Effective for Homes Revised April 17, 2013 Page 1 of 8 Permitted Starting 6/17/2013 To qualify as a DOE Challenge Home, a home shall meet the minimum requirements specified below, be verified and field-tested in accordance with HERS Standards by an approved verifier, and meet all applicable codes. Builders may meet the requirements of either the Performance Path or the Prescriptive path to qualify a home. 1 Single family detached and attached dwelling units, and dwelling units in multifamily buildings with 3 stories or fewer above-grade 2,3 are eligible for qualification. DOE Challenge Home Prescriptive Path The prescriptive path provides a single set of measures that can be used to construct a DOE Challenge Home labeled

245

A New Approach to Component Testing  

E-Print Network (OSTI)

Carefully tested electric/electronic components are a requirement for effective hardware-in-the-loop tests and vehicle tests in automotive industry. A new method for definition and execution of component tests is described. The most important advantage of this method is independance from the test stand. It therefore offers the oppportunity to build up knowledge over a long period of time and the ability to share this knowledge with different partners.

Brinkmeyer, Horst

2011-01-01T23:59:59.000Z

246

GEOCHEMICAL TESTING AND MODEL DEVELOPMENT - RESIDUAL TANK WASTE TEST PLAN  

SciTech Connect

This Test Plan describes the testing and chemical analyses release rate studies on tank residual samples collected following the retrieval of waste from the tank. This work will provide the data required to develop a contaminant release model for the tank residuals from both sludge and salt cake single-shell tanks. The data are intended for use in the long-term performance assessment and conceptual model development.

CANTRELL KJ; CONNELLY MP

2010-03-09T23:59:59.000Z

247

An Improved Test Case Generation Method of Pair-Wise Testing  

Science Conference Proceedings (OSTI)

Pair-wise testing is a testing criterion based on specification, which requires that for each pair of parameters, every combination of their valid value should be covered by at least one test case in the test set. This paper presents an improved method ...

Qian Feng-an; Jiang Jian-hui

2007-10-01T23:59:59.000Z

248

Acceptance test specifications for test number eleven: sodium system filling, heatup, pressurization, and drain. [LMFBR  

SciTech Connect

This document provides the general instructions for performing acceptance test number eleven as indicated in the Acceptance Test Index (TI-022-130-003). Also indicated are the plant conditions and special equipment required to conduct the test. The acceptance criteria for each portion of the test are specified.

Bell, C.R.

1975-05-01T23:59:59.000Z

249

Bus Research and Testing Program Heavy-duty Chassis Dynamometer and Emissions Testing Facility  

E-Print Network (OSTI)

Bus Research and Testing Program Heavy-duty Chassis Dynamometer and Emissions Testing Facility, hydrocarbons and carbon dioxide from transit buses and heavy-duty vehicles when they are tested on simulated includes a heavy-duty chassis dynamometer, required for conducting these tests, as well as a heavy

Lee, Dongwon

250

Selected Guidance & Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Selected Guidance & Requirements Selected Guidance & Requirements Selected Guidance & Requirements This page contains the most requested NEPA guidance and requirement documents and those most often recommended by the Office of NEPA Policy and Compliance. Documents are listed by agency, in reverse chronological order. More extensive collections of documents are available on the individual pages for Guidance and Requirements pages. Requirements - Statutes National Environmental Policy Act of 1969 Environmental Quality Improvement Act of 1970 Clean Air Act, Section 309 Guidance - Council on Environmental Quality NEPA at 19: A Primer on an "Old" Law with Solutions to New Problems 40 Most Asked Questions Concerning CEQ's NEPA Regulations Guidance - Department of Energy DOE, NEPA, and You

251

Part B - Requirements & Funding Information  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

B - Requirements & Funding Information B - Requirements & Funding Information PART B - Requirements & Funding Information .......................................................................................... 2 PART B - Requirements & Funding Information B.1. Purpose This Part of the IA (hereinafter 'Part B') serves as the funding document. It provides specific information on the requirements of the Department of Energy, hereinafter 'the Requesting Agency' sufficient to demonstrate a bona fide need and identifies funds associated with the requirement to allow [insert the name of agency/organization that will provide acquisition services for the Department of Energy], hereinafter 'the Servicing Agency,' to provide acquisition assistance and conduct an interagency acquisition.

252

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Reduction Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A commercial vehicle or gasoline powered vehicle may not idle for more than five minutes during any 60-minute period. Exemptions are allowed for the

253

Alternative Fuels Data Center: Biodiesel Warranty Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Warranty Warranty Requirement to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Warranty Requirement on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Warranty Requirement on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Warranty Requirement on Google Bookmark Alternative Fuels Data Center: Biodiesel Warranty Requirement on Delicious Rank Alternative Fuels Data Center: Biodiesel Warranty Requirement on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Warranty Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Warranty Requirement All new state government diesel vehicles must have a manufacturer's warranty that allows the use of biodiesel blends of 20% (B20) in the

254

Alternative Fuels Data Center: Biofuels Blender Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biofuels Blender Biofuels Blender Requirements to someone by E-mail Share Alternative Fuels Data Center: Biofuels Blender Requirements on Facebook Tweet about Alternative Fuels Data Center: Biofuels Blender Requirements on Twitter Bookmark Alternative Fuels Data Center: Biofuels Blender Requirements on Google Bookmark Alternative Fuels Data Center: Biofuels Blender Requirements on Delicious Rank Alternative Fuels Data Center: Biofuels Blender Requirements on Digg Find More places to share Alternative Fuels Data Center: Biofuels Blender Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biofuels Blender Requirements Blenders of ethanol and gasoline and biodiesel and diesel fuels outside of the bulk transfer terminal system must obtain a blender's license and are

255

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A gasoline-fueled motor vehicle is not allowed to operate for more than three consecutive minutes when the vehicle is not in motion, with the

256

Alternative Fuels Data Center: Biodiesel Sales Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biodiesel Sales Biodiesel Sales Requirements to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Sales Requirements on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Sales Requirements on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Sales Requirements on Google Bookmark Alternative Fuels Data Center: Biodiesel Sales Requirements on Delicious Rank Alternative Fuels Data Center: Biodiesel Sales Requirements on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Sales Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Sales Requirements It is unlawful for any person to sell, offer for sale, assist in the sale of, deliver, or permit to be sold or offered for sale any biodiesel,

257

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A vehicle may not idle at a loading zone, parking or service area, route terminal, or other off-street areas, except for the following situations:

258

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A motor vehicle engine may not operate for more than five consecutive minutes when the vehicle is not in motion, with the following exceptions:

259

Alternative Fuels Data Center: Idle Reduction Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirements to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirements on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirements on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirements on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirements on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirements on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirements Effective May 1, 2014, a driver may not idle his or her motor vehicle for more than five minutes in a 60-minute period. This limit does not apply if

260

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement Diesel vehicles with a gross vehicle weight rating over 10,000 pounds may not idle for more than five minutes in any continuous 60 minute period.

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Reduction Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement The owner or operator of a diesel powered vehicle must limit the length of time their vehicle remains idle. The limit is based on the outside

262

Alternative Fuels Data Center: Ethanol Labeling Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol Labeling Ethanol Labeling Requirement to someone by E-mail Share Alternative Fuels Data Center: Ethanol Labeling Requirement on Facebook Tweet about Alternative Fuels Data Center: Ethanol Labeling Requirement on Twitter Bookmark Alternative Fuels Data Center: Ethanol Labeling Requirement on Google Bookmark Alternative Fuels Data Center: Ethanol Labeling Requirement on Delicious Rank Alternative Fuels Data Center: Ethanol Labeling Requirement on Digg Find More places to share Alternative Fuels Data Center: Ethanol Labeling Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol Labeling Requirement Any motor vehicle fuel sold at retail containing more than 1% ethanol or methanol must be labeled according to Connecticut Department of Consumer

263

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement Motor vehicles may not idle unnecessarily for longer than five consecutive minutes during any 60-minute period. This includes heavy-duty diesel

264

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement Diesel truck or bus engines may not idle for more than 15 consecutive minutes. Exemptions apply to diesel trucks or buses for which the Nevada

265

Alternative Fuels Data Center: Ethanol Labeling Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol Labeling Ethanol Labeling Requirement to someone by E-mail Share Alternative Fuels Data Center: Ethanol Labeling Requirement on Facebook Tweet about Alternative Fuels Data Center: Ethanol Labeling Requirement on Twitter Bookmark Alternative Fuels Data Center: Ethanol Labeling Requirement on Google Bookmark Alternative Fuels Data Center: Ethanol Labeling Requirement on Delicious Rank Alternative Fuels Data Center: Ethanol Labeling Requirement on Digg Find More places to share Alternative Fuels Data Center: Ethanol Labeling Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol Labeling Requirement All gasoline containing 1% or more ethanol by volume offered for sale must be conspicuously identified as "with ethanol" or "containing ethanol."

266

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A person that operates a diesel powered motor vehicle in certain counties and townships may not cause or allow the motor vehicle, when it is not in

267

Alternative Fuels Data Center: Biodiesel Use Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biodiesel Use Biodiesel Use Requirement to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Use Requirement on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Use Requirement on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Use Requirement on Google Bookmark Alternative Fuels Data Center: Biodiesel Use Requirement on Delicious Rank Alternative Fuels Data Center: Biodiesel Use Requirement on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Use Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Use Requirement At least 75% of the Missouri Department of Transportation (MoDOT) vehicles and heavy equipment that use diesel fuel must be fueled with biodiesel

268

Alternative Fuels Data Center: Biofuel Use Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Use Use Requirement to someone by E-mail Share Alternative Fuels Data Center: Biofuel Use Requirement on Facebook Tweet about Alternative Fuels Data Center: Biofuel Use Requirement on Twitter Bookmark Alternative Fuels Data Center: Biofuel Use Requirement on Google Bookmark Alternative Fuels Data Center: Biofuel Use Requirement on Delicious Rank Alternative Fuels Data Center: Biofuel Use Requirement on Digg Find More places to share Alternative Fuels Data Center: Biofuel Use Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biofuel Use Requirement State agencies must take all reasonable actions to develop the infrastructure necessary to increase the availability and use of E85 and biodiesel throughout the state. Employees using state-owned vehicles are

269

Mobile IP Authentication, Authorization, and Accounting Requirements  

Science Conference Proceedings (OSTI)

The Mobile IP and Authentication, Authorization, Accounting (AAA) working groups are currently looking at defining the requirements for Authentication, Authorization, and Accounting. This document contains the requirements which would have to be supported ...

S. Glass; T. Hiller; S. Jacobs; C. Perkins

2000-10-01T23:59:59.000Z

270

Salt Lake City- High Performance Buildings Requirement  

Energy.gov (U.S. Department of Energy (DOE))

Salt Lake City's mayor issued an executive order in July 2005 requiring that all public buildings owned and controlled by the city be built or renovated to meet the requirements of LEED "silver"...

271

Business System Planning Project System Requirements Specification  

SciTech Connect

The purpose of the Business Systems Planning Project System Requirements Specification (SRS) is to provide the outline and contents of the requirements for the CH2M HILL Hanford Group, Inc. (CHG) integrated business and technical information systems. The SRS will translate proposed objectives into the statement of the functions that are to be performed and data and information flows that they require. The requirements gathering methodology will use (1) facilitated group requirement sessions; (2) individual interviews; (3) surveys; and (4) document reviews. The requirements will be verified and validated through coordination of the technical requirement team and CHG Managers. The SRS document used the content and format specified in Lockheed Martin Services, Inc. Organization Standard Software Practices in conjunction with the Institute of Electrical and Electronics Engineers Standard 8340-1984 for Systems Requirements Documents.

NELSON, R.E.

2000-09-08T23:59:59.000Z

272

Science-Driven Network Requirements for ESnet  

E-Print Network (OSTI)

Network Requirements for ESnet Update to the 2002 Office ofNetwork Requirements for ESnet Update to the 2002 Office ofEdited by Eli Dart, ESnet Engineering Staff dart@es.net

2006-01-01T23:59:59.000Z

273

Functions and Requirements for the Transition Project  

SciTech Connect

This document describes the functional requirement baseline for the Transition of 100 K Area Facilities Project (Transition Project). This baseline information consists of top-level functions, requirements, concept description, interface description, issues, and enabling assumptions.

YANOCHKO, R.M.

2000-04-24T23:59:59.000Z

274

Alternative Fuels Data Center: Emissions Control Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Emissions Control Emissions Control Requirement to someone by E-mail Share Alternative Fuels Data Center: Emissions Control Requirement on Facebook Tweet about Alternative Fuels Data Center: Emissions Control Requirement on Twitter Bookmark Alternative Fuels Data Center: Emissions Control Requirement on Google Bookmark Alternative Fuels Data Center: Emissions Control Requirement on Delicious Rank Alternative Fuels Data Center: Emissions Control Requirement on Digg Find More places to share Alternative Fuels Data Center: Emissions Control Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Emissions Control Requirement Heavy-duty diesel vehicles used to perform federally funded state public works contracts must be powered by engines with Level 3 emissions control

275

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A diesel- or gasoline-powered motor vehicle may not idle for more than three consecutive minutes, except under the following conditions: 1) to

276

Alternative Fuels Data Center: Ethanol Labeling Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol Labeling Ethanol Labeling Requirement to someone by E-mail Share Alternative Fuels Data Center: Ethanol Labeling Requirement on Facebook Tweet about Alternative Fuels Data Center: Ethanol Labeling Requirement on Twitter Bookmark Alternative Fuels Data Center: Ethanol Labeling Requirement on Google Bookmark Alternative Fuels Data Center: Ethanol Labeling Requirement on Delicious Rank Alternative Fuels Data Center: Ethanol Labeling Requirement on Digg Find More places to share Alternative Fuels Data Center: Ethanol Labeling Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol Labeling Requirement Motor fuel containing more than 1% ethanol or methanol may not be sold or offered for sale from a motor fuel dispenser unless the individual selling

277

Alternative Fuels Data Center: Biodiesel Use Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biodiesel Use Biodiesel Use Requirement to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Use Requirement on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Use Requirement on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Use Requirement on Google Bookmark Alternative Fuels Data Center: Biodiesel Use Requirement on Delicious Rank Alternative Fuels Data Center: Biodiesel Use Requirement on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Use Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Use Requirement At least 20% of all diesel fuel used to fuel state agency vehicles, vessels, and construction equipment must be biodiesel. The Washington

278

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement Motor vehicles licensed for commercial or public service may not idle for more than three minutes in commercial or residential urban areas, unless

279

Alternative Fuels Data Center: Biodiesel Labeling Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Labeling Labeling Requirement to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Labeling Requirement on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Labeling Requirement on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Labeling Requirement on Google Bookmark Alternative Fuels Data Center: Biodiesel Labeling Requirement on Delicious Rank Alternative Fuels Data Center: Biodiesel Labeling Requirement on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Labeling Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Labeling Requirement Biodiesel fuel retailers may not advertise or offer for sale fuel labeled as pure biodiesel unless the fuel contains no other type of petroleum

280

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement Idling of any unattended vehicle is prohibited in Utah. Violators are subject to a penalty of up to $750 and/or up to 90 days imprisonment.

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Reduction Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement On-road heavy-duty motor vehicles with a gross vehicle weight rating of 8,500 pounds or greater may not idle for more than three consecutive

282

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A motor vehicle may not idle for more than five consecutive minutes. This regulation does not apply to: 1) vehicles being serviced, provided that

283

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Reduction Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement Vehicle operators may not idle any commercial diesel vehicle with a gross vehicle weight rating of more than 10,000 pounds for more than 10 minutes

284

Alternative Fuels Data Center: Biodiesel Use Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biodiesel Use Biodiesel Use Requirement to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Use Requirement on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Use Requirement on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Use Requirement on Google Bookmark Alternative Fuels Data Center: Biodiesel Use Requirement on Delicious Rank Alternative Fuels Data Center: Biodiesel Use Requirement on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Use Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Use Requirement All diesel-powered motor vehicles, light trucks, and equipment owned or leased by a state agency must operate using diesel fuel that contains a

285

Alternative Fuels Data Center: Ethanol Blend Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol Blend Ethanol Blend Requirement to someone by E-mail Share Alternative Fuels Data Center: Ethanol Blend Requirement on Facebook Tweet about Alternative Fuels Data Center: Ethanol Blend Requirement on Twitter Bookmark Alternative Fuels Data Center: Ethanol Blend Requirement on Google Bookmark Alternative Fuels Data Center: Ethanol Blend Requirement on Delicious Rank Alternative Fuels Data Center: Ethanol Blend Requirement on Digg Find More places to share Alternative Fuels Data Center: Ethanol Blend Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol Blend Requirement Suppliers that import gasoline for sale in North Carolina must offer fuel that is not pre-blended with fuel alcohol but that is suitable for future

286

Alternative Fuels Data Center: Propane Supplier Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Propane Supplier Propane Supplier Requirements to someone by E-mail Share Alternative Fuels Data Center: Propane Supplier Requirements on Facebook Tweet about Alternative Fuels Data Center: Propane Supplier Requirements on Twitter Bookmark Alternative Fuels Data Center: Propane Supplier Requirements on Google Bookmark Alternative Fuels Data Center: Propane Supplier Requirements on Delicious Rank Alternative Fuels Data Center: Propane Supplier Requirements on Digg Find More places to share Alternative Fuels Data Center: Propane Supplier Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Propane Supplier Requirements A retail supplier may only distribute liquefied petroleum gas (LPG or propane) if the supplier holds a license from the Wisconsin Department of

287

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement School bus operators may not idle a school bus engine for more than three consecutive minutes except under the following conditions: uncontrollable

288

Alternative Fuels Data Center: Biofuels Feedstock Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biofuels Feedstock Biofuels Feedstock Requirements to someone by E-mail Share Alternative Fuels Data Center: Biofuels Feedstock Requirements on Facebook Tweet about Alternative Fuels Data Center: Biofuels Feedstock Requirements on Twitter Bookmark Alternative Fuels Data Center: Biofuels Feedstock Requirements on Google Bookmark Alternative Fuels Data Center: Biofuels Feedstock Requirements on Delicious Rank Alternative Fuels Data Center: Biofuels Feedstock Requirements on Digg Find More places to share Alternative Fuels Data Center: Biofuels Feedstock Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biofuels Feedstock Requirements Renewable fuel production plants operating in Louisiana and deriving ethanol from the distillation of corn must use corn crops harvested in

289

Alternative Fuels Data Center: Biofuels Use Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biofuels Use Biofuels Use Requirement to someone by E-mail Share Alternative Fuels Data Center: Biofuels Use Requirement on Facebook Tweet about Alternative Fuels Data Center: Biofuels Use Requirement on Twitter Bookmark Alternative Fuels Data Center: Biofuels Use Requirement on Google Bookmark Alternative Fuels Data Center: Biofuels Use Requirement on Delicious Rank Alternative Fuels Data Center: Biofuels Use Requirement on Digg Find More places to share Alternative Fuels Data Center: Biofuels Use Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biofuels Use Requirement State-owned diesel-powered vehicles and equipment must use a biodiesel blend that contains at least 2% biodiesel (B2), where available, as long as

290

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Reduction Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A commercial motor vehicle with a gross vehicle weight rating of 10,000 pounds or more may not idle for more than 15 minutes in any 60-minute

291

Alternative Fuels Data Center: Tire Inflation Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Tire Inflation Tire Inflation Requirement to someone by E-mail Share Alternative Fuels Data Center: Tire Inflation Requirement on Facebook Tweet about Alternative Fuels Data Center: Tire Inflation Requirement on Twitter Bookmark Alternative Fuels Data Center: Tire Inflation Requirement on Google Bookmark Alternative Fuels Data Center: Tire Inflation Requirement on Delicious Rank Alternative Fuels Data Center: Tire Inflation Requirement on Digg Find More places to share Alternative Fuels Data Center: Tire Inflation Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Tire Inflation Requirement The California Air Resources Board (ARB) enforces regulations to reduce greenhouse gas emissions from vehicles operating inefficiently with under

292

Alternative Fuels Data Center: Biofuel Use Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biofuel Use Biofuel Use Requirements to someone by E-mail Share Alternative Fuels Data Center: Biofuel Use Requirements on Facebook Tweet about Alternative Fuels Data Center: Biofuel Use Requirements on Twitter Bookmark Alternative Fuels Data Center: Biofuel Use Requirements on Google Bookmark Alternative Fuels Data Center: Biofuel Use Requirements on Delicious Rank Alternative Fuels Data Center: Biofuel Use Requirements on Digg Find More places to share Alternative Fuels Data Center: Biofuel Use Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biofuel Use Requirements To reduce fossil fuel dependence and statewide greenhouse gas emissions, New Jersey state departments, agencies, offices, universities, and colleges

293

Alternative Fuels Data Center: Biodiesel Producer Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biodiesel Producer Biodiesel Producer Requirements to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Producer Requirements on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Producer Requirements on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Producer Requirements on Google Bookmark Alternative Fuels Data Center: Biodiesel Producer Requirements on Delicious Rank Alternative Fuels Data Center: Biodiesel Producer Requirements on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Producer Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Producer Requirements Biodiesel is defined as a fuel that is composed of mono-alkyl esters of long-chain fatty acids derived from plant or animal matter, meets the

294

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A vehicle may not idle for more than five minutes from April through October in cities and counties where the local government has signed a

295

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A driver may not idle a vehicle on a roadway outside a business or residential district when it is practical to stop and park the vehicle. A

296

Science-Driven Network Requirements for ESnet  

E-Print Network (OSTI)

Update to the 2002 Office of Science Networking RequirementsUpdate to the 2002 Office of Science Networking RequirementsUS Dept. of Energy, Office of Science, Advanced Scientific

2006-01-01T23:59:59.000Z

297

Animal carcinogen testing challenged  

SciTech Connect

The past 15 years have seen a long list of man-made chemicals indicated as potential human carcinogens. Now, a prominent cancer researcher says that the risks of those chemicals have been overestimated partly because of a serious design flaw in the animal tests used to assess their carcinogenicity. The researcher, Bruce Ames of the University of California, Berkeley, has become well known for his views that many of the newsmaking carcinogens pose little risk to the general human population. He also argues that current policies for testing and regulating carcinogens, which emphasize synthetic chemicals, are misdirected. In animal tests the chemicals are usually administered in the maximum tolerated doses (MTDs), which are the highest doses that can be given without causing severe weight loss or other life-threatening signs of toxicity. Even though these levels are much higher than the doses to which people are likely to be exposed, MTDs are used to cut down on the number of animals- and thus the cost-required to obtain statistically significant results. Although the MTDs don't cause overt signs of toxicity, they can still have more subtle toxic effects, however, and that is what Ames thinks accounts for the large number of compounds that test positive for carcinogenicity.

Marx, J.

1990-11-09T23:59:59.000Z

298

Federal Energy Management Program: Energy Management Requirements...  

NLE Websites -- All DOE Office Websites (Extended Search)

requirement and guidance pages include: Sustainable Buildings and Campuses Facility Energy Intensity Reduction New Facility Construction and Major Renovation Pollution...

299

WATER REQUIREMENTS FOR A RADIOCHEMICAL PROCESSING PLANT  

SciTech Connect

A survey of the water requirements is presented for a hypothetical plant to process all the fuel from a 15,000Mwe nuclear economy. For each processing plant, specific requirements must be based on a detailed water survey which includes water quality, process requirements, and in-plant conservation plans. These considerations are discussed and the quantitative requirements are listed. (J.R.D.)

Harrington, F.E.

1962-05-28T23:59:59.000Z

300

SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Requirements...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

system owners, project managers, and other information system development and maintenance professionals with guidance in identifying and planning requirements management...

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Civilian Radioactive Waste Management System Requirements Document...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management System Requirements Document More Documents & Publications Transportation, Aging and Disposal Canister System Performance Specification: Revision 1 FY 2007 Total...

302

SPECIAL ACQUISITION REQUIREMENTS ? TYPICAL ISSUES ASSOCIATED...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(iii) Approving any contractual documents, to include documents defining requirements, incentive plans, and evaluation criteria (iv) Awarding contracts (v) Administering...

303

Program Requirements | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Requirements | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our...

304

Integrating Security RMF with Requirements Management – J ...  

Science Conference Proceedings (OSTI)

Integrating Security RMF with Requirements Management – J Peeler ... Security controls at “Low” Risk are risk accepted & may not need mitigation. ...

2013-12-13T23:59:59.000Z

305

Requirements Uncertainty in a Software Product Line  

Science Conference Proceedings (OSTI)

A complex system's requirements almost always remain uncertain late into its software development. In gas turbine engine control systems at Rolls-Royce, for a traditional project (non-product line) typically 50% of requirements will change between Critical ... Keywords: Requirements, Uncertainty, Software Product Lines

Andy J. Nolan; Silvia Abrahao; Paul C. Clements; Andy Pickard

2011-08-01T23:59:59.000Z

306

Guidelines for Mapping Requirements to Technologies  

Science Conference Proceedings (OSTI)

This report describes in a concise format the IntelliGrid methodology for determining appropriate technologies to meet a given set of system requirements for advanced metering infrastructures (AMI). The process consists of three steps: 1) map technologies to functional areas of AMI, 2) map requirements to components and, therefore, functional areas of AMI, and 3) map individual requirements to technologies.

2008-06-17T23:59:59.000Z

307

Advanced Metering Infrastructure (AMI) System Security Requirements  

Science Conference Proceedings (OSTI)

This report identifies key cyber security requirements and suggests basic security approaches for safeguarding the many interfaces of Advanced Metering Infrastructure (AMI) systems. These requirements, which were developed through a clearly defined security assessment procedure, are generic; but they can be used to develop more specific security requirements based on actual configurations and environments.

2009-12-21T23:59:59.000Z

308

Aflatoxin Test Kit Laboratory Proficiency Testing  

Science Conference Proceedings (OSTI)

Lab proficiency testing for Aflatoxin test kit to determine Total Aflatoxins.Samples include Peanut Paste, Corn Meal, Milk. Aflatoxin Test Kit Laboratory Proficiency Testing Laboratory Proficiency Program (LPP) aocs applicants certified chemist chemists

309

Integrated Geothermal Well Testing: Test Objectives and Facilities  

DOE Green Energy (OSTI)

A new and highly integrated geothermal well test program was designed for three geothermal operators in the US (MCR, RGI and Mapco Geothermal). This program required the design, construction and operation of new well test facilities. The main objectives of the test program and facilities are to investigate the critical potential and worst problems associated with the well and produced fluids in a period of approximately 30 days. Field and laboratory investigations are required to determine and quantify the problems of fluid production, utilization and reinjection. The facilities are designed to handle a flow rate from a geothermal well of one million pounds per hour at a wellhead temperature of approximately 268 C (515 F). The facilities will handle an entire spectrum of temperature and rate conditions up to these limits. All pertinent conditions for future fluid exploitations can be duplicated with these facilities, thus providing critical information at the very early stages of field development. The new well test facilities have been used to test high temperature, liquid-dominated geothermal wells in the Imperial Valley of California. The test facilities still have some problems which should be solvable. The accomplishments of this new and highly integrated geothermal well test program are described in this paper.

Nicholson, R. W.; Vetter, O. J.

1981-01-01T23:59:59.000Z

310

Guidance & Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidance & Requirements Guidance & Requirements Guidance & Requirements The Office of NEPA Policy and Compliance provides guidance and requirement documents to the NEPA community to ensure that the Department's proposed actions comply with the letter and spirit of the National Environmental Policy Act, and to assist the interested public in reviewing NEPA documents. Guidance Guidance documents from the Council on Environmental Quality, Department of Energy, Environmental Protection Agency, and other federal agencies applicable to NEPA proposed actions. Requirements A collection of statutes, Council on Environmental Quality regulations, Department of Energy regulations, and Executive Orders applicable to NEPA proposed actions. Lessons Learned Quarterly Report A collection of guidance, case studies, analyses, references, litigation

311

SIENA Customer Problem Statement and Requirements  

Science Conference Proceedings (OSTI)

This document describes the problem domain and functional requirements of the SIENA framework. The software requirements and system architecture of SIENA are specified in separate documents (called SIENA Software Requirement Specification and SIENA Software Architecture, respectively). While currently this version of the document describes the problems and captures the requirements within the Analysis domain (concentrating on finite element models), it is our intention to subsequent y expand this document to describe problems and capture requirements from the Design and Manufacturing domains. In addition, SIENA is designed to be extendible to support and integrate elements from the other domains (see SIENA Software Architecture document).

L. Sauer; R. Clay; C. Adams; H. Walther; B. Allan; R. Mariano; C. Poore; B. Whiteside; B. Boughton; J. Dike; E. Hoffman; R. Hogan; C. LeGall

2000-08-01T23:59:59.000Z

312

Nitrogen chiller acceptance test procedure  

SciTech Connect

This document includes the inspection and testing requirements for the Nitrogen Chiller unit. The Chiller will support the Rotary Mode core Sampling System during the summer. The Chiller cools the Nitrogen Purge Gas that is used when drilling in tank wastes to cool the drill bit.

Kostelnik, A.J.

1995-03-07T23:59:59.000Z

313

OM Code Requirements For MOVs -- OMN-1 and Appendix III  

SciTech Connect

The purpose or scope of the ASME OM Code is to establish the requirements for pre-service and in-service testing of nuclear power plant components to assess their operational readiness. For MOVs this includes those that perform a specific function in shutting down a reactor to the safe shutdown condition, maintaining the safe shutdown condition, and mitigating the consequences of an accident. This paper will present a brief history of industry and regulatory activities related to MOVs and the development of Code requirements to address weaknesses in earlier versions of the OM Code. The paper will discuss the MOV requirements contained in the 2009 version of ASME OM Code, specifically Mandatory Appendix III and OMN-1, Revision 1.

Kevin G. DeWall

2011-08-01T23:59:59.000Z

314

Octane number requirements of vehicles at high altitude  

Science Conference Proceedings (OSTI)

Past tests of vehicles show that their octane number requirements decrease with altitude. As a result, gasoline marketers sell lower-octane-number(ON) gasoline in the mountain states and other high-altitude areas. The current ASTM specifications, which allow reduction of gasoline octane of 1.0 to 1.5 ON per thousand feet, are based on CRC test programs run on 1967 to 1972 model vehicles. However, many new vehicles are now equipped with sophisticated electronic engine systems for control of emissions and improvement of performance and fuel economy at all altitudes. Because these new systems could minimize the altitude effect on octane requirement, Amoco Oil tested twelve 1984-1986 model cars and light trucks. The authors found their ON requirements were reduced on average about 0.2 ON per thousand feet on an (R+M)/2 basis (RMON/1,000 feet). The authors expect octane demand on gasoline suppliers in high-altitude areas to increase as these new cars make up a larger part of the vehicle population, and this could raise the cost of gasoline.

Callison, J.C.

1987-01-01T23:59:59.000Z

315

Test conditions for evaluating natural gas storage properties of adsorbents. Topical report, December 1993-March 1994  

SciTech Connect

The growing interest in using adsorbed natural gas (ANG) as a vehicle fuel has led to requests for information about adsorbent property and performance requirements. The general lack of comprehensive technical information about these issues points to the need for expanded data gathering and analysis efforts. The technical information compiled in this report should assist gas industry personnel and others in developing reliable testing protocols for evaluating adsorbent properties and assessing the performance of ANG as a vehicle fuel.

Tramposch, W.G.

1994-09-01T23:59:59.000Z

316

Monitored Geologic Repository Test Evaluation Plan  

SciTech Connect

The Monitored Geologic Repository test & evaluation program will specify tests, demonstrations, examinations, and analyses, and describe procedures to conduct and document testing necessary to verify meeting Monitored Geologic Repository requirements for a safe and effective geologic repository for radioactive waste. This test program will provide assurance that the repository is performing as designed, and that the barriers perform as expected; it will also develop supporting documentation to support the licensing process and to demonstrate compliance with codes, standards, and regulations. This comprehensive program addresses all aspects of verification from the development of test requirements to the performance of tests and reporting of the test results. The ''Monitored Geologic Repository Test & Evaluation Plan'' provides a detailed description of the test program approach necessary to achieve the above test program objectives. This test plan incorporates a set of test phases focused on ensuring repository safety and operational readiness and implements a project-wide integrated product management team approach to facilitate test program planning, analysis, and implementation. The following sections provide a description of the individual test phases, the methodology for test program planning and analyses, and the management approach for implementing these activities.

M.B. Skorska

2002-01-02T23:59:59.000Z

317

Distributed Power Program DER Pilot Test at the Nevada Test Site  

SciTech Connect

The DOE Distributed Power Program conducted a pilot test of interconnection test procedures November 12-16, 2001 at Area 25 of the Nevada Test Site (NTS). The objective of this pilot test was to respond to Congressional direction in the Energy and Water Development Appropriations Act of 2001 to complete a distributed power demonstration at the Nevada Test Site and validated interconnection tests in the field. The demonstration consisted of field verification of tests in IEEE P1547 (Draft 7) that are required for interconnection of distributed generation equipment to electrical power systems. Some of the testing has been conducted in a laboratory setting, but the Nevada Test Site provided a location to verify the interconnection tests in the field. The testing also provided valuable information for evaluating the potential for the Nevada Test Site to host future field-testing activities in support of Distributed Energy Resources System Integration R&D.

Kroposki, B.; DeBlasio, R.; Galdo, J.

2002-05-01T23:59:59.000Z

318

Automating the mutation testing of aspect-oriented Java programs  

Science Conference Proceedings (OSTI)

Aspect-Oriented Programming has introduced new types of software faults that may be systematically tackled with mutation testing. However, such testing approach requires adequate tooling support in order to be properly performed. This paper addresses ... Keywords: aspect-oriented programming, mutation testing, test automation, testing tools

Fabiano Cutigi Ferrari; Elisa Yumi Nakagawa; Awais Rashid; José Carlos Maldonado

2010-05-01T23:59:59.000Z

319

The test data challenge for database-driven applications  

Science Conference Proceedings (OSTI)

Business applications rely typically on databases for storing and processing their data (database-driven applications, or DBAPs). Testing DBAPs requires testing the application logic plus the interaction between the application logic and the database. ... Keywords: databases, information systems, test coverage, test data, testing

Klaus Haller

2010-06-01T23:59:59.000Z

320

Evaluation tests for photovoltaic concentrator receiver sections and modules  

DOE Green Energy (OSTI)

Sandia has developed a third-generation set of specifications for performance and reliability testing of photovoltaic concentrator modules. Several new requirements have been defined. The primary purpose of the tests is to screen new concentrator designs and new production runs for susceptibility to known failure mechanisms. Ultraviolet radiation testing of materials precedes receiver section and module performance and environmental tests. The specifications include the purpose, procedure, and requirements for each test. Recommendations for future improvements are presented.

Woodworth, J.R.; Whipple, M.L.

1992-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

NERSC HPC Program Requirements Review Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

Published Reports Published Reports NERSC HPC Program Requirements Review Reports These publications comprise the final reports from the HPC requirements reviews presented to the Department of Energy. Downloads NERSC-PRR-HEP-2017.pdf | Adobe Acrobat PDF file Large Scale Computing and Storage Requirements for High Energy Physics - Target 2017 BER2017FinalJune7.pdf | Adobe Acrobat PDF file Large Scale Computing and Storage Requirements for Biological and Environmental Research - Target 2017 NERSC-ASCR-WorkshopReport.pdf | Adobe Acrobat PDF file Large Scale Computing and Storage Requirements for Advanced Scientific Computing Research NERSC-NP-WorkshopReport.pdf | Adobe Acrobat PDF file Large Scale Computing and Storage Requirements for Nuclear Physics Research NERSC-FES-WorkshopReport.pdf | Adobe Acrobat PDF file

322

Molten salt test loop  

DOE Green Energy (OSTI)

The objective of the Molten Salt Test Loop Project was to design, construct, and demonstrate operation of an outdoor high temperature molten salt test facility. This facility is operational, and can now be used to evaluate materials and components, and the design features and operating procedures required for molten salt heat transport systems. The initial application of the loop was to demonstrate the feasibility of using molten salt as the heat transport medium for a high temperature distributed collector system. A commercially available eutectic salt blend is used as the heat transfer fluid. This salt has a composition of 40% NaNO/sub 2/, 7% NaNO/sub 3/, and 53% KNO/sub 3/ and is marketed under the trade name Hitec. It has a freezing (solidifying) point of 142/sup 0/C (288/sup 0/F) and has been satisfactorily used at temperatures as high as 594/sup 0/C (1100/sup 0/F). General Atomic (GA) installed a row of Fixed Mirror Solar Concentrators (FMSC's) in the loop. The system was started up and a test program conducted. Startup went smoothly, with the exception of some burned-out trace heaters. Salt temperatures as high as 571/sup 0/C (1060/sup 0/F) were achieved.

Schuster, J.R.; Eggers, G.H.

1980-01-01T23:59:59.000Z

323

Test Plan: WIPP bin-scale CH TRU waste tests  

SciTech Connect

This WIPP Bin-Scale CH TRU Waste Test program described herein will provide relevant composition and kinetic rate data on gas generation and consumption resulting from TRU waste degradation, as impacted by synergistic interactions due to multiple degradation modes, waste form preparation, long-term repository environmental effects, engineered barrier materials, and, possibly, engineered modifications to be developed. Similar data on waste-brine leachate compositions and potentially hazardous volatile organic compounds released by the wastes will also be provided. The quantitative data output from these tests and associated technical expertise are required by the WIPP Performance Assessment (PA) program studies, and for the scientific benefit of the overall WIPP project. This Test Plan describes the necessary scientific and technical aspects, justifications, and rational for successfully initiating and conducting the WIPP Bin-Scale CH TRU Waste Test program. This Test Plan is the controlling scientific design definition and overall requirements document for this WIPP in situ test, as defined by Sandia National Laboratories (SNL), scientific advisor to the US Department of Energy, WIPP Project Office (DOE/WPO). 55 refs., 16 figs., 19 tabs.

Molecke, M.A.

1990-08-01T23:59:59.000Z

324

Increased Software Reliability Through Input Validation Analysis and Testing  

Science Conference Proceedings (OSTI)

The Input Validation Testing (IVT) technique has been developed to address the problem of statically analyzing input command syntax as defined in English textual interface and requirements specifications and then generating test cases for input validation ... Keywords: Software reliability, requirements analysis, system testing, quality control and assurance, interfaces, input validation

Jane Huffman Hayes; A. Jefferson Offutt

1999-11-01T23:59:59.000Z

325

Bases for pump pit requirements calculations  

DOE Green Energy (OSTI)

A task team is preparing the Process Requirements for the interarea transfer pump pits at the Defense Waste Process Facility (DWPF). The team is developing requirements to prevent flammable mixtures from forming and requires values to use on the generation of various components such as benzene, hydrogen, and N20. The purpose of this memorandum is to document values to be used and to provide sample calculations using these values. There are no recommendations contained in this document.

Jacobs, R.A.

1992-02-13T23:59:59.000Z

326

Safety of magnetic fusion facilities: Requirements  

SciTech Connect

This Standard identifies safety requirements for magnetic fusion facilities. Safety functions are used to define outcomes that must be achieved to ensure that exposures to radiation, hazardous materials, or other hazards are maintained within acceptable limits. Requirements applicable to magnetic fusion facilities have been derived from Federal law, policy, and other documents. In addition to specific safety requirements, broad direction is given in the form of safety principles that are to be implemented and within which safety can be achieved.

1996-05-01T23:59:59.000Z

327

NBP RFI: Communications Requirements- Honeywell Responses To...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Information (RFI) from the Department of Energy on Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities To Inform Federal...

328

Program Requirements | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Follow this link to skip to the main content Facebook Flickr RSS Twitter YouTube Program Requirements | National Nuclear Security Administration Our Mission Managing the Stockpile...

329

Partnership Requirements: ENERGY STAR Partnership for Commercial...  

NLE Websites -- All DOE Office Websites (Extended Search)

Partnership Requirements: ENERGY STAR Partnership for Commercial & Industrial Service and Product Providers (SPP) Secondary menu About us Press room Contact Us Portfolio Manager...

330

Equipment Certification Requirements | Open Energy Information  

Open Energy Info (EERE)

Equipment Certification Requirements Equipment Certification Requirements Jump to: navigation, search Policies requiring renewable energy equipment to meet certain standards serve to protect consumers from buying inferior equipment. These requirements not only benefit consumers; they also protect the renewable energy industry by making it more difficult for substandard systems to reach the market. [1] Contents 1 Equipment Certification Incentives 2 References Equipment Certification Incentives CSV (rows 1 - 19) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active Canada Oil and Gas Operations Act (Canada) Environmental Regulations Equipment Certification Fees Generating Facility Rate-Making Generation Disclosure Industry Recruitment/Support Safety and Operational Guidelines

331

Electric Vehicle Charging Levels and Requirements Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

and certification Safety standards and certification * Charging definitions * EVSE ( (electric vehicle supp pp y ly eq quip pment) ) examp ples * Installation requirements * Siting...

332

Exterior Lighting Requirements and COMcheck | Building Energy...  

NLE Websites -- All DOE Office Websites (Extended Search)

Version Development Adoption Compliance Regulations Resource Center Exterior Lighting Requirements and COMcheck This course includes a discussion of the exterior lighting...

333

This content requires Flash - Business Cards  

This content requires Flash. To view this content, JavaScript must be enabled, and you need the latest version of the Adobe Flash Player. Download the ...

334

Allocating Variability and Reserve Requirements (Presentation)  

SciTech Connect

This presentation describes how you could conceivably allocate variability and reserve requirements, including how to allocate aggregation benefits. Conclusions of this presentation are: (1) Aggregation provides benefits because individual requirements are not 100% correlated; (2) Method needed to allocate reduced requirement among participants; (3) Differences between allocation results are subtle - (a) Not immediately obvious which method is 'better'; (b) Many are numerically 'correct', they sum to the physical requirement; (c) Many are not 'fair', Results depend on sub-aggregation and/or the order individuals are included; and (4) Vector allocation method is simple and fair.

Kirby, B.; King, J.; Milligan, M.

2011-10-01T23:59:59.000Z

335

Requirements of Magnetic Materials for Current Technological ...  

Science Conference Proceedings (OSTI)

Mar 3, 2011 ... Magnetic Materials for Energy Applications: Requirements of Magnetic ... Hard magnetic materials play a significant role in many green ...

336

NERSC/DOE HPC Requirements Workshops Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Overview NERSC HPC Program Requirements Reviews Overview Scope These workshops are focused on determining the computational challenges facing research teams and the computational...

337

NERSC/DOE BER Requirements Workshop Participants  

NLE Websites -- All DOE Office Websites (Extended Search)

for Biological and Environmental Research: Target 2017 A Joint ASCR BER NERSC Requirements Review September 11-12, 2012 DOE NERSC Participants and Organizers Name...

338

NERSC/DOE FES Requirements Workshop Logistics  

NLE Websites -- All DOE Office Websites (Extended Search)

Department of Energy's Office of Fusion Energy Sciences and Office of Advanced Scientific Computing Research (ASCR) to elucidate computing requirements for fusion energy sciences...

339

NERSC/DOE ASCR Requirements Workshop Logistics  

NLE Websites -- All DOE Office Websites (Extended Search)

Workshop Logistics Large Scale Computing and Storage Requirements for Advanced Scientific Computing Research January 5-6, 2011 Location The workshop will be held at NERSC's...

340

NERSC/DOE BES Requirements Workshop Logistics  

NLE Websites -- All DOE Office Websites (Extended Search)

Department of Energy's Office of Basic Energy Sciences and Office of Advanced Scientific Computing Research (ASCR) to elucidate computing requirements for high energy physics...

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

NERSC/DOE ASCR Requirements Workshop Agenda  

NLE Websites -- All DOE Office Websites (Extended Search)

Workshop Agenda Large Scale Computing and Storage Requirements for Advanced Scientific Computing Research ASCR NERSC Workshop January 5-6, 2011 >> Download and View these...

342

NERSC/DOE ASCR Requirements Workshop Presentations  

NLE Websites -- All DOE Office Websites (Extended Search)

Presentations Large Scale Computing and Storage Requirements for Advanced Scientific Computing Research An ASCR NERSC Workshop January 5-6, 2011 Sort by: Default | Name |...

343

NERSC/DOE ASCR Requirements Workshop Participants  

NLE Websites -- All DOE Office Websites (Extended Search)

Participants Large Scale Computing and Storage Requirements for Advanced Scientific Computing Research An ASCR NERSC Workshop January 5-6, 2011 On-Site Participants Name...

344

Cape Charles - STIP Minimum Sustainability Requirements (Virginia...  

Open Energy Info (EERE)

Share this page on Facebook icon Twitter icon Cape Charles - STIP Minimum Sustainability Requirements (Virginia) This is the approved revision of this page, as well as...

345

Allocating Variability and Reserve Requirements (Presentation)  

DOE Green Energy (OSTI)

This presentation describes how you could conceivably allocate variability and reserve requirements, including how to allocate aggregation benefits. Conclusions of this presentation are: (1) Aggregation provides benefits because individual requirements are not 100% correlated; (2) Method needed to allocate reduced requirement among participants; (3) Differences between allocation results are subtle - (a) Not immediately obvious which method is 'better'; (b) Many are numerically 'correct', they sum to the physical requirement; (c) Many are not 'fair', Results depend on sub-aggregation and/or the order individuals are included; and (4) Vector allocation method is simple and fair.

Kirby, B.; King, J.; Milligan, M.

2011-10-01T23:59:59.000Z

346

Federal Energy Management Program: Energy Management Requirements...  

NLE Websites -- All DOE Office Websites (Extended Search)

Law and Regulation Federal agencies must meet energy management requirements outlined by Federal various statutory laws and regulations. They include: National Energy Conservation...

347

NERSC/DOE BER Requirements Meeting Logistics  

NLE Websites -- All DOE Office Websites (Extended Search)

Math & Computer Science Nuclear Science Science Highlights HPC Requirements Reviews Basic Energy Sciences Fusion Energy Sciences (FES) High Energy Physics (HEP) Biological and...

348

Test and Test Equipment Joshua Lottich  

E-Print Network (OSTI)

Test and Test Equipment Joshua Lottich CMPE 640 11/23/05 #12;Testing Verifies that manufactured chip meets design specifications. Cannot test for every potential defect. Modeling defects as faults allows for passing and failing of chips. Ideal test would capture all defects and pass only chips

Patel, Chintan

349

Test Preparation Options Free Test Prep Websites  

E-Print Network (OSTI)

Test Preparation Options Free Test Prep Websites ACT: http: http://www.collegeboard.com/student/testing/sat/prep_one/test.html http://www.number2.com://testprep.princetonreview.com/CourseSearch/Search.aspx?itemCode=17&productType=F&rid=1&zip=803 02 Test Prep Classes Front Range Community College: Classes

Stowell, Michael

350

Resampling Hypothesis Tests for Autocorrelated Fields  

Science Conference Proceedings (OSTI)

Presently employed hypothesis tests for multivariate geophysical data (e.g., climatic fields) require the assumption that either the data are serially uncorrelated, or spatially uncorrelated, or both. Good methods have been developed to deal with ...

D. S. Wilks

1997-01-01T23:59:59.000Z

351

MECHANICAL TEST LAB CAPABILITIES  

E-Print Network (OSTI)

MECHANICAL TEST LAB CAPABILITIES · Static and cyclic testing (ASTM and non-standard) · Impact drop testing · Slow-cycle fatigue testing · High temperature testing to 2500°F · ASTM/ Boeing/ SACMA standard testing · Ability to design and fabricate non-standard test fixtures and perform non-standard tests

352

Test plan : reducing soft costs of rooftop solar installations attributed to structural considerations.  

SciTech Connect

This test plan is a document that provides a systematic approach to the planned testing of rooftop structures to determine their actual load carrying capacity. This document identifies typical tests to be performed, the responsible parties for testing, the general feature of the tests, the testing approach, test deliverables, testing schedule, monitoring requirements, and environmental and safety compliance.

Dwyer, Stephen F.

2013-05-01T23:59:59.000Z

353

Building HVAC Requirements Overview Page 4-1 4 Building HVAC Requirements  

E-Print Network (OSTI)

Building HVAC Requirements ­ Overview Page 4-1 4 Building HVAC Requirements 4.1 Overview 4 conditioning (HVAC) systems. The requirements are presented in this chapter so that it may serve as a single. 2008 Residential Compliance Manual August 2009 #12;Page 4-2 Building HVAC Requirements ­ Overview 4

354

Core Science Requirement Final Document Page 1 THE CORE SCIENCE REQUIREMENT and  

E-Print Network (OSTI)

Core Science Requirement ­ Final Document ­ Page 1 THE CORE SCIENCE REQUIREMENT and MENDEL SCIENCE EXPERIENCE COURSES Core requirement of 2 semesters of science with laboratory; requirement to be met by the end of the sophomore year Rationale Science literacy is an integral part of the intellectual

Lagalante, Anthony F.

355

Automated consistency checking of requirements specifications  

Science Conference Proceedings (OSTI)

This article describes a formal analysis technique, called consistency checking, for automatic detection of errors, such as type errors, nondeterminism, missing cases, and circular definitions, in requirements specifications. The technique ... Keywords: application-independent properties, consistency checking, formal requirements modeling, software cost reduction methodology, tabular notations

Constance L. Heitmeyer; Ralph D. Jeffords; Bruce G. Labaw

1996-07-01T23:59:59.000Z

356

Designating required vs. optional input fields  

Science Conference Proceedings (OSTI)

This paper describes a study comparing different techniques for visually distingishing required from optional input fields in a form-filling application. Seven techniques were studied: no indication, bold field labels, chevrons in front of the labels, ... Keywords: data input, optional fields, required fields, visual design

Thomas S. Tullis; Ana Pons

1997-03-01T23:59:59.000Z

357

Supporting requirements engineers in recognising security issues  

Science Conference Proceedings (OSTI)

Context & motivation: More and more software projects today are security-related in one way or the other. Many environments are initially not considered security-related and no security experts are assigned. Requirements engineers often fail to recognise ... Keywords: empirical study, natural language processing, requirements analysis, secure software engineering

Eric Knauss; Siv Houmb; Kurt Schneider; Shareeful Islam; Jan Jürjens

2011-03-01T23:59:59.000Z

358

Clean Air Act Requirements: Uranium Mill Tailings  

E-Print Network (OSTI)

EPA'S Clean Air Act Requirements: Uranium Mill Tailings Radon Emissions Rulemaking Reid J. Rosnick Presentation to Environmental Protection Agency Uranium Contamination Radiation Protection Division (6608J requirements for operating uranium mill tailings (Subpart W) Status update on Subpart W activities Outreach

359

Requirements for wireless technology on rolling stock  

Science Conference Proceedings (OSTI)

This paper gives an overview of railway specific requirements on wireless technologies and discusses the influence of different product life cycles in railway industry and communication technology. The main challenges are the heterogeneous communication ... Keywords: maintenance, passenger information, product life cycle, railway application interface, railway requirements, train operation, wireless communication

Uwe Kucharzyk

2011-03-01T23:59:59.000Z

360

Lightweight Formalisation in Support of Requirements Engineering  

Science Conference Proceedings (OSTI)

Formal design supported by automated reasoning can help keep track of requirements—a particular problem for large, detailed systems. Designers of system specifications are often constrained by codes of practice and must show not only that ... Keywords: automated reasoning, design, requirements, safety-critical systems, software engineering, specifications

Jane Hesketh; David Robertson; Norbert Fuchs; Alan Bundy

1998-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Large scale test simulations using the Virtual Environment for Test Optimization (VETO)  

SciTech Connect

The Virtual Environment for Test Optimization (VETO) is a set of simulation tools under development at Sandia to enable test engineers to do computer simulations of tests. The tool set utilizes analysis codes and test information to optimize design parameters and to provide an accurate model of the test environment which aides in the maximization of test performance, training, and safety. Previous VETO effort has included the development of two structural dynamics simulation modules that provide design and optimization tools for modal and vibration testing. These modules have allowed test engineers to model and simulate complex laboratory testing, to evaluate dynamic response behavior, and to investigate system testability. Further development of the VETO tool set will address the accurate modeling of large scale field test environments at Sandia. These field test environments provide weapon system certification capabilities and have different simulation requirements than those of laboratory testing.

Klenke, S.E.; Heffelfinger, S.R.; Bell, H.J.; Shierling, C.L.

1997-10-01T23:59:59.000Z

362

Advanced Light Water Reactor utility requirements document  

SciTech Connect

The ALWR Requirements Document is a primary work product of the EPRI Program. This document is an extensive compilation of the utility requirements for design, construction and performance of advanced light water reactor power plants for the 1990s and beyond. The Requirements Document's primary emphasis is on resolution of significant problems experienced at existing nuclear power plants. It is intended to be used with companion documents, such as utility procurement specifications, which would cover the remaining detailed technical requirements applicable to new plant projects. The ALWR Requirements Document consists of several major parts. This volume is Part I, The Executive Summary. It is intended to serve as a concise, management level synopsis of advanced light water reactors including design objectives and philosophy, overall configuration and features and the steps necessary to proceed from the conceptual design stage to a completed, functioning power plant.

1986-06-01T23:59:59.000Z

363

Advanced Vehicle Testing Activity: Energy Storage Testing  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Storage Testing The Advanced Vehicle Testing Activity is tasked by the U.S. Department of Energy's Vehicle Technologies Office to conduct various types of energy storage...

364

Testing FAQs HAVA Certification and Testing  

Science Conference Proceedings (OSTI)

... In the marketplace, testing provides a vehicle for exchanging information ... For sellers (eg, manufacturers), testing can help to substantiate claims that ...

2012-11-02T23:59:59.000Z

365

Test Anxiety: A Test of Attentional Bias.  

E-Print Network (OSTI)

??Test anxiety is characterized by apprehension, panic, and ruminating thoughts of potential failure that are experienced during an exam situation. In a test conscious society,… (more)

Lawson, Darla Jane

2006-01-01T23:59:59.000Z

366

Rulemaking Activities to Risk-Inform Requirements in 10 CFR Part 50  

SciTech Connect

This paper presents the status of NRC activities to revise requirements in Title 10 of the Code of Federal Regulations (10 CFR Part 50) to make them more risk-informed. The activities include proposed changes to treatment requirements (requirements such as quality assurance, testing, inspection, documentation that are imposed to add confidence in the capability of structures, systems and components (SSCs) to perform their intended functions) as well as changes to certain technical requirements. The technical requirements under consideration are those relating to combustible gas control and for emergency core cooling systems (including the evaluation models). (authors)

McKenna, Eileen M.; Reed, Timothy A. [U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001 (United States)

2002-07-01T23:59:59.000Z

367

Measurement Requirements for Climate Monitoring of Upper-Air Temperature Derived from Reanalysis Data  

Science Conference Proceedings (OSTI)

Using a reanalysis of the climate of the past half century as a model of temperature variations over the next half century, tests of various data collection protocols are made to develop recommendations for observing system requirements for ...

Dian J. Seidel; Melissa Free

2006-03-01T23:59:59.000Z

368

Baseline LAW Glass Formulation Testing  

Science Conference Proceedings (OSTI)

The major objective of the baseline glass formulation work was to develop and select glass formulations that are compliant with contractual and processing requirements for each of the LAW waste streams. Other objectives of the work included preparation and characterization of glasses with respect to the properties of interest, optimization of sulfate loading in the glasses, evaluation of ability to achieve waste loading limits, testing to demonstrate compatibility of glass melts with melter materials of construction, development of glass formulations to support ILAW qualification activities, and identification of glass formulation issues with respect to contract specifications and processing requirements.

Kruger, Albert A. [USDOE Office of River Protection, Richland, WA (United States); Mooers, Cavin [The Catholic University of America, Washington, DC (United States). Vitreous State Lab.; Bazemore, Gina [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Pegg, Ian L. [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Hight, Kenneth [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Lai, Shan Tao [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Buechele, Andrew [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Rielley, Elizabeth [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Gan, Hao [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Muller, Isabelle S. [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Cecil, Richard [The Catholic University of America, Washington, DC (United States). Vitreous State Lab

2013-06-13T23:59:59.000Z

369

In-place HEPA filter penetration test  

SciTech Connect

We have demonstrated the feasibility of conducting penetration tests on high efficiency particulate air (HEPA) filters as installed in nuclear ventilation systems. The in-place penetration test, which is designed to yield equivalent penetration measurements as the standard DOP efficiency test, is based on measuring the aerosol penetration of the filter installation as a function of particle size using a portable laser particle counter. This in-place penetration test is compared to the current in-place leak test using light scattering photometers for single HEPA filter installations and for HEPA filter plenums using the shroud method. Test results show the in-place penetration test is more sensitive than the in-place leak test, has a similar operating procedure, but takes longer to conduct. Additional tests are required to confirm that the in-place penetration test yields identical results as the standard dioctyl phthalate (DOP) penetration test for HEPA filters with controlled leaks in the filter and gasket and duct by-pass leaks. Further development of the procedure is also required to reduce the test time before the in- place penetration test is practical.

Bergman, W.; Wilson, kK.; Elliott, J.; Bettencourt, B.; Slawski, J.W.

1997-01-01T23:59:59.000Z

370

Vaccine refrigerator testing. Final report  

SciTech Connect

For the Central American Health Clinic Project initiated in 1986, Sandia National Laboratories and the Florida Solar Energy Center recognized the need for a test and evaluation program for vaccine refrigeration systems. At the Florida Solar Energy Center, side-by-side testing of three photovoltaic powered vaccine refrigerators began in 1987. The testing was expanded in 1988 to include a kerosene absorption refrigerator. This report presents observations, conclusions, and recommendations derived from testing the four vaccine refrigeration systems. Information is presented pertaining to the refrigerators, photovoltaic arrays, battery subsystems, charge controllers, and user requirements. This report should be of interest to designers, manufacturers, installers, and users of photovoltaic-powered vaccine refrigeration systems and components.

Ventre, G.G. [Univ. of Central Florida, Orlando, FL (United States); Kilfoyle, D.; Marion, B. [Florida Solar Energy Center, Cape Canaveral, FL (United States)

1990-06-01T23:59:59.000Z

371

Statutory Requirements | Building Energy Codes Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Map Printable Version Development Adoption Compliance Regulations Resource Center Statutory Requirements DOE activities surrounding building energy codes are defined by the following statutory requirements. Specific language outlining federal requirements and associated regulations are outlined below. References are also provided to individual statutes. State Building Energy Efficiency Codes Statutory Authority: Energy Conservation and Production Act (ECPA) (Pub. L. No. 94-385), as amended1 Section 304(a) of ECPA, as amended, provides that when the 1992 Model Energy Code (MEC), or any successor to that code2, is revised, the Secretary must determine, not later than 12 months after the revision, whether the revised code would improve energy efficiency in residential

372

Green Building Requirement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Green Building Requirement Green Building Requirement Green Building Requirement < Back Eligibility Commercial Schools State Government Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Bioenergy Solar Lighting Windows, Doors, & Skylights Heating Buying & Making Electricity Water Heating Wind Program Info State District of Columbia Program Type Energy Standards for Public Buildings Provider District Department of the Environment The District of Columbia City Council enacted [http://dcclims1.dccouncil.us/images/00001/20061218152322.pdf B16-515] on December 5, 2006, establishing green building standards for public buildings and privately-owned commercial buildings of 50,000 square feet or

373

Guide to NRC reporting and recordkeeping requirements  

SciTech Connect

This compilation includes in the first two sections the reporting and recordkeeping requirements applicable to US Nuclear Regulatory Commission (NRC) licensees and applicants and to members of the public. It includes those requirements codified in Title 10 of the Code of Federal Regulations, Chapter I, on December 31, 1991. It also includes, in a separate section, any of those requirements that were superseded or discontinued from January through December 1991. Finally, the appendix lists mailing and delivery addresses for NRC Headquarters and Regional Offices mentioned in the compilation.

Collins, M.; Shelton, B.

1992-11-01T23:59:59.000Z

374

Data requirements and acquisition for reservoir characterization  

Science Conference Proceedings (OSTI)

This report outlines the types of data, data sources and measurement tools required for effective reservoir characterization, the data required for specific enhanced oil recovery (EOR) processes, and a discussion on the determination of the optimum data density for reservoir characterization and reservoir modeling. The two basic sources of data for reservoir characterization are data from the specific reservoir and data from analog reservoirs, outcrops, and modern environments. Reservoir data can be divided into three broad categories: (1) rock properties (the container) and (2) fluid properties (the contents) and (3)interaction between reservoir rock and fluid. Both static and dynamic measurements are required.

Jackson, S.; Chang, Ming Ming; Tham, Min

1993-03-01T23:59:59.000Z

375

Supporting use case based requirements engineering  

E-Print Network (OSTI)

Use Cases that describe possible interactions involving a system and its environment are increasingly being accepted as effective means for functional requirements elicitation and analysis. In the current practice, informal definitions of use cases are used and the analysis process is manual. In this paper, we present an approach supported by a tool for use cases based requirements engineering. Our approach includes use cases formalization, a restricted form of natural language for use cases description, and the derivation of an executable specification as well as a simulation environment from use cases. Key words: Use cases, domain modeling, UML, requirements engineering, prototyping

Stéphane S. Somé

2006-01-01T23:59:59.000Z

376

Microsoft Word - Topic A Requirements _2_  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A Requirements A Requirements Topic A, Interconnection-Level Analysis and Planning Topic A awardees must fulfill the following requirements: 1. The work to be performed must cover the entire Interconnection. 2. Analyses and planning must be developed and performed in a transparent and collaborative manner, and the study processes must be open to participation by state and federal officials, representatives from independent system operators (ISOs) and regional transmission organizations (RTOs), utilities, and relevant stakeholder bodies or non-government organizations (NGO's), including appropriate entities in Canada and Mexico. Discuss approach to ensure consensus among stakeholders on key issues. 3. The awardee must establish a multi-constituency steering group that will provide

377

Test Methods for the Tensile Evaluation of Ceramic Fibers  

Science Conference Proceedings (OSTI)

Abstract Scope, Test methods for the determination of tensile strength of ceramic fibers will be reviewed. The withdrawal of ASTM D3379 and the requirements in ...

378

Part B - Requirements & Funding Information PART B - Requirements and Funding Information  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

b. Part B 1 b. Part B 1 Part B - Requirements & Funding Information PART B - Requirements and Funding Information Gray highlights are instructions. Remove the instructions from the interagency agreement. Attachment 3.b. Part B 2 PART B - Requirements & Funding Information B.1. Purpose This is an interagency transaction. An interagency transaction is an intra-governmental transaction when the servicing agency uses internal resources to support the requesting agency requirement and is a reimbursable activity that requires an interagency agreement. This Part of the interagency agreement (IA) (hereinafter 'Part B') serves as the funding document. It provides specific information on the requirements of the Department of Energy, hereinafter 'the Requesting

379

Phased Startup Initiative Phases 3 and 4 Test Plan and Test Specification (OCRWM)  

SciTech Connect

Construction for the Spent Nuclear Fuel (SNF) Project facilities is continuing per the Level III Baseline Schedule, and installation of the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) in K West Basin is now complete. In order to accelerate the project, a phased start up strategy to initiate testing of the FRS and IWTS early in the overall project schedule was proposed (Williams 1999). Wilkinson (1999) expands the definition of the original proposal into four functional testing phases of the Phased Startup Initiative (PSI). Phases 1 and 2 are based on performing functional tests using dummy fuel. These tests are described in separate planning documents. This test plan provides overall guidance for Phase 3 and 4 tests, which are performed using actual irradiated N fuel assemblies. The overall objective of the Phase 3 and 4 testing is to verify how the FRS and IWTS respond while processing actual fuel. Conducting these tests early in the project schedule will allow identification and resolution of equipment and process problems before they become activities on the start-up critical path. The specific objectives of this test plan are to: (1) Define the test scope for the FRS and IWTS; (2) Provide detailed test requirements that can be used to write the specific test procedures; (3) Define data required and measurements to be taken. Where existing methods to obtain these do not exist, enough detail will be provided to define required additional equipment; and (4) Define specific test objectives and acceptance criteria.

PITNER, A.L.

2000-02-28T23:59:59.000Z

380

Optimization Online - Test  

E-Print Network (OSTI)

Jan 25, 2006 ... Test. Andrew Goldberg (goldberg ***at*** cs.wisc.edu). Abstract: Test. Keywords: Test. Category 1: Infinite Dimensional Optimization ...

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

ECT-Test-Methods  

Science Conference Proceedings (OSTI)

ECT-Test-Methods. A, B, C, D. 1, NVLAP ECT Test Method Selection List (updated 2013-12-02). 2, 3, Standard Category, Test ...

2013-12-02T23:59:59.000Z

382

PNNI Routing Interoperability Tests)  

Science Conference Proceedings (OSTI)

... The individual tests are written in TCL. There is a one for one correspondence between the tests in TCL and the tests described ...

383

Face Vendor Recognition Test  

Science Conference Proceedings (OSTI)

... FRVT 2002 consisted of two tests: the High ... goal of the Recognition Performance Test was to ... All systems were tested on a standardized database. ...

2013-07-25T23:59:59.000Z

384

Healthcare Message Test Generation  

Science Conference Proceedings (OSTI)

... a tool that creates a suite of test message instances ... to support an actor based testing framework and ... administer and analyze the results of the tests. ...

2013-06-13T23:59:59.000Z

385

BESTEST Test Suites  

NLE Websites -- All DOE Office Websites (Extended Search)

BESTEST Test Suites BESTEST (Building Energy Simulation TEST) is a method for testing, diagnosing, and validating the capabilities of building energy simulation programs. The...

386

USGv6 Testing Program  

Science Conference Proceedings (OSTI)

... their own list of tested products accessible ... items arising include soliciting test laboratories and ... participate in the USGv6 testing program, soliciting ...

2013-06-02T23:59:59.000Z

387

Tension-Compression Testing  

Science Conference Proceedings (OSTI)

Tension-Compression Testing. ... version of the tension-compression test, to enable ... loading around draw-beads, where calibration tests must include ...

2013-04-10T23:59:59.000Z

388

Test Advising Framework.  

E-Print Network (OSTI)

??Test cases are represented in various formats depending on the process, the technique or the tool used to generate the tests. While different test case… (more)

Wang, Yurong

2013-01-01T23:59:59.000Z

389

Directed Test Suite Augmentation.  

E-Print Network (OSTI)

??Test suite augmentation techniques are used in regression testing to identify code elements affected by changes and to generate test cases to cover those elements.… (more)

Xu, Zhihong

2013-01-01T23:59:59.000Z

390

Advanced Nuclear Technology: Regulatory Performance Requirements for Safety-Related Instrumentation, Revision 1  

Science Conference Proceedings (OSTI)

This report proposes an acceptable methodology to apply to safety-related instrumentation to demonstrate 95% probability and 95% confidence (95/95) uncertainties in support of the requirements of Nuclear Regulatory Commission Regulatory Guide (RG) 1.105 Revision 3. This methodology should serve as a means to specify testing and analysis requirements to instrumentation manufacturers and suppliers for their use in meeting the RG 1.105 Revision 3 95% probability and 95% confidence requirements. A ...

2013-08-07T23:59:59.000Z

391

ROCKY MOUNTAIN OILFIELD TESTING CENTER  

NLE Websites -- All DOE Office Websites (Extended Search)

SAM III PROJECT SAM III PROJECT Sandia National laboratories Prepared for: Project File Documentation Prepared by: MICHAEL J. TAYLOR Project Manager March 31, 1998 JO 850200 : FC 970009 ABSTRACT The Rocky Mountain Oilfield Testing Center (RMOTC) conducted a demonstration of the Surface Area Modulation Downhole Telemetry System (SAM 111) at the Department of Energy's Naval Petroleum Reserve No. 3 (NPR-3), in partnership with Sandia National Laboratories (SNL). The project encompassed the testing of a real-time wireless telemetry system in a simulated Measurement-While-Drilling (MWD) environment. A Surface Area Modulation (SAM) technique demonstrated data transmission rates greater than present techniques, in a deployment mode which requires

392

Nevada Test Site Waste Acceptance Criteria (NTSWAC)  

SciTech Connect

This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, Nevada Test Site Waste Acceptance Criteria (NTSWAC). The NTSWAC provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive (LLW) and LLW Mixed Waste (MW) for disposal.

NNSA /NSO Waste Management Project

2008-06-01T23:59:59.000Z

393

200 Area treated effluent disposal facility operational test report  

Science Conference Proceedings (OSTI)

This document reports the results of the 200 Area Treated Effluent Disposal Facility (200 Area TEDF) operational testing activities. These completed operational testing activities demonstrated the functional, operational and design requirements of the 200 Area TEDF have been met.

Crane, A.F.

1995-03-01T23:59:59.000Z

394

CRUSH TESTING OF 9977 GENERAL PURPOSE FISSILE PACKAGINGS  

SciTech Connect

The 9977 General Purpose Fissile Package (GPFP) was designed in response to the adoption of the crush test requirement in the US regulations for packages for radioactive materials (10 CFR 71). This presentation on crush testing of the 9977 GPFP Reviews origins of Crush Test Requirements and implementation of crush test requirements in 10 CFR 71. SANDIA testing performed to support the rule making is reviewed. The differences in practice, on the part of the US Department of Energy from those required by the NRC for commercial purposes, are explained. The design features incorporated into the 9977 GPFP to enable it to withstand the crush test and the crush tests performed on the 9977 are described. Lessons learned from crush testing of GPFP packagings are given.

Smith, A.

2010-07-28T23:59:59.000Z

395

Automated testing as an aid to systems integration  

Science Conference Proceedings (OSTI)

Within BT‘s Systems Integration department, the integration and testing of large, complex software systems often requires large and complex test regimes. Optimising the activities and time-scales within this part of the life cycle will invariably ...

I. D. Hicks; G. J. South; A. O. Oshisanwo

1997-07-01T23:59:59.000Z

396

Hypothesis testing for auto-correlated short climate time series  

Science Conference Proceedings (OSTI)

Commonly used statistical tests of hypothesis, also termed inferential tests, which are available to meteorologists and climatologists all require independent data in the time series to which they are applied. Unfortunately, most of the time ...

Virginie Guemas; Ludovic Auger; Francisco J. Doblas-Reyes

397

Risk effectiveness evaluation of surveillance testing  

SciTech Connect

In nuclear power plants surveillance tests are required to detect failures in standby safety system components as a means of assuring their availability in case of an accident. However, the performance of surveillance tests at power may have adverse impact on safety as evidenced by the operating experience of the plants. The risk associated with a test includes two different aspects: (1) a positive aspect, i.e., risk contribution detected by the test, that results from the detection of failures which occur between tests and are detected by the test, and (2) a negative aspect, i.e., risk contribution caused by the test, that includes failures and degradations which are caused by the test or are related to the performance of the test. In terms of the two different risk contributions, the risk effectiveness of a test can be simply defined as follows: a test is risk effective if the risk contribution detected by the test is greater than the risk contribution caused by the test; otherwise it is risk ineffective. The methodology presentation will focus on two important kinds of negative test risk impacts, that is, the risk impacts of test-caused transients and equipment wear-out. The evaluation results of the risk effectiveness of the test will be presented in the full paper along with the risk assessment methodology and the insights from the sensitivity analysis. These constitute the core of the NUREG/CR-5775.

Martorell, S.; Kim, I.S. (Universidad Politecnica de Valencia (Spain). Dept. de Ingenieria Quimica y Nuclear); Samanta, P.K. (Brookhaven National Lab., Upton, NY (United States)); Vesely, W.E. (Science Applications International Corp., Columbus, OH (United States))

1992-07-20T23:59:59.000Z

398

land requirements | OpenEI Community  

Open Energy Info (EERE)

by Sfomail(48) Member 25 June, 2013 - 12:10 Solar Land Use Data on OpenEI acres csp land use how much land land requirements pv land use solar land use square miles I'm...

399

Siting Requirements for Anaerobic Lagoons (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

This statute provides regulations for required distances between anaerobic lagoons and residences or public use areas. The separation distances may be waived or reduced with the agreement of the...

400

Tucson- Solar Design Requirement for Homes  

Energy.gov (U.S. Department of Energy (DOE))

Tucson adopted an ordinance in June 2008 that requires all new single-family homes and duplexes in Tucson to be "solar-ready." The ordinance was developed by a stakeholder group which included...

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Microsoft Word - Requirements_list.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

SELECTED LIST OF REQUIREMENTS SELECTED LIST OF REQUIREMENTS DESCRIPTION REQUIREMENT APPLICABILITY 1. Federal Motor Carrier Registration 49 CFR 390.19; 390.21 Motor carriers that conduct commercial motor vehicle operations in interstate commerce. 2. Hazardous Materials Safety Permit 49 CFR 385, Subpart E Motor carriers that transport the hazardous materials listed at 49 CFR 385.403. 3. Federal Hazardous Materials Registration 49 CFR 107, Subpart G Offering or transporting a hazardous material listed at 49 CFR 107.601. This list includes hazardous materials requiring placarding. 4. Texas State Motor Carrier Registration 43 TAC, Chap. 18, Subchap. B Motor carriers that conduct commercial motor vehicle operations in Texas. 5. Unified Carrier Registration 49 CFR 367 Motor carriers, motor private carriers, brokers, freight forwarders and leasing companies.

402

Federal Greenhouse Gas Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Requirements Requirements Federal Greenhouse Gas Requirements October 7, 2013 - 10:02am Addthis Executive Order (E.O.) 13514 expands the energy reduction and environmental requirements of Executive Order 13423 by making greenhouse gas (GHG) management a priority for the Federal government. Under Section 2 of E.O. 13514, each Federal agency must: Within 90 days of the order, establish and report to the CEQ Chair and OMB Director a percentage reduction target for agency-wide reductions of Scope 1 and Scope 2 GHG emissions in absolute terms by fiscal year 2020 relative to a fiscal year 2008 baseline of the agency's Scope 1 greenhouse gas emissions. In establishing the target, agencies shall consider reductions associated with: Reducing agency building energy intensity Increasing agency renewable energy use and implementing on-site renewable

403

Technical requirements specification for tank waste retrieval  

Science Conference Proceedings (OSTI)

This document provides the technical requirements specification for the retrieval of waste from the underground storage tanks at the Hanford Site. All activities covered by this scope are conducted in support of the Tank Waste Remediation System (TWRS) mission.

Lamberd, D.L.

1996-09-26T23:59:59.000Z

404

The Access Almanac: Solar Parking Requirements  

E-Print Network (OSTI)

for many commuters’ electric cars. California requires that,well suited to charging electric cars. If the solar energydrivers who don’t own electric cars can feel green when they

Shoup, Donald

2012-01-01T23:59:59.000Z

405

Cook County- LEED Requirements for County Buildings  

Energy.gov (U.S. Department of Energy (DOE))

In 2002, Cook County enacted an ordinance requiring all new county buildings and all retrofitted county buildings to be built to LEED standards. Specifically, all newly constructed buildings and...

406

Deepwater Offshore Wind Technology Research Requirements (Poster)  

DOE Green Energy (OSTI)

A poster presentation for AWEA's WindPower 2005 conference in Denver, Colorado, May 15-18, 2005 that provides an outline of the requirements for deepwater offshore wind technology development

Musial, W.

2005-05-01T23:59:59.000Z

407

Deriving Quantified Safety Requirements in Complex Systems  

Science Conference Proceedings (OSTI)

A variety of hazard analysis techniques have been proposed for software-based systems but individually the techniques are limited in their ability to cope with system complexity, or to derive and prioritise component safety requirements. There is also ...

Peter A. Lindsay; John A. McDermid; David J. Tombs

2000-10-01T23:59:59.000Z

408

Deepwater Offshore Wind Technology Research Requirements (Poster)  

SciTech Connect

A poster presentation for AWEA's WindPower 2005 conference in Denver, Colorado, May 15-18, 2005 that provides an outline of the requirements for deepwater offshore wind technology development

Musial, W.

2005-05-01T23:59:59.000Z

409

Temporal Sampling Requirements for Automatic Rain Gauges  

Science Conference Proceedings (OSTI)

Automatic rain gauges are needed to obtain rainfall statistics from remote locations and platforms. Many of these platforms cannot be serviced regularly, thus requiring unattended operations for many months. At such locations there is often a ...

Jeffrey A. Nystuen

1998-12-01T23:59:59.000Z

410

NERSC/DOE FES Requirements Workshop Presentations  

NLE Websites -- All DOE Office Websites (Extended Search)

Fusion Energy Sciences An FES ASCR NERSC Workshop August 3-4, 2010 Sort by: Default | Name | Date (low-high) | Date (high-low) FESNERSC Requirements Gathering Workshop August...

411

LBNL Window & Daylighting Software -- RESFEN: System Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

SYSTEM REQUIREMENTS OPERATING SYSTEM Windows 95, Windows 98, Windows 2000, Windows XP, or Windows NT CPU TYPE Pentium (a 133 MHz pentium will take about 40 seconds to perform a...

412

Diagnostic Requirements for the Superrotation on Venus  

Science Conference Proceedings (OSTI)

For the solar heating and zonal wind profiles observed in the Venus atmosphere (below 80 km) we have calculated the eddy source pattern required to maintain the zonally averaged circulation.

Arthur Y. Hou; Richard M. Goody

1985-03-01T23:59:59.000Z

413

Energy Efficiency and Conservation Requirements for Utilities...  

Open Energy Info (EERE)

standard. Phase II will run from June 1, 2013 - May 31, 2016 and requires (tentatively) energy savings that vary by utility from 1.6% to 2.9% of June 2009 - May 2010 electricity...

414

Cold vacuum drying facility design requirements  

SciTech Connect

This release of the Design Requirements Document is a complete restructuring and rewrite to the document previously prepared and released for project W-441 to record the design basis for the design of the Cold Vacuum Drying Facility.

Irwin, J.J.

1997-09-24T23:59:59.000Z

415

Smart Grid Information Security (IS) Functional Requirement  

E-Print Network (OSTI)

It is important to implement safe smart grid environment to enhance people's lives and livelihoods. This paper provides information on smart grid IS functional requirement by illustrating some discussion points to the sixteen identified requirements. This paper introduces the smart grid potential hazards that can be referred as a triggering factor to improve the system and security of the entire grid. The background of smart information infrastructure and the needs for smart grid IS is described with the adoption of hermeneutic circle as methodology. Grid information technology and security-s session discusses that grid provides the chance of a simple and transparent access to different information sources. In addition, the transformation between traditional versus smart grid networking trend and the IS importance on the communication field reflects the criticality of grid IS functional requirement identification is introduces. The smart grid IS functional requirements described in this paper are general and ...

Ling, Amy Poh Ai

2011-01-01T23:59:59.000Z

416

Requirements and Submission Process for Qualified Software  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Requirements and Submission Process for Qualified Software The U.S. Department of Energy (DOE) verifies and maintains the list of software that qualifies for the calculation of the energy and power cost savings for commercial building tax deductions under tax code Section 179D. The software requirements are listed under Internal Revenue Service (IRS) Code §179D (c)(1) and (d) Regulations, Notice 2006-52

417

CANMET Gasifier Liner Coupon Material Test Plan  

SciTech Connect

The test plan detailed in this topical report supports Task 1 of the project titled ''Development of Technologies and Capabilities for Coal Energy Resources - Advanced Gasification Systems Development (AGSD)''. The purpose of these tests is to verify that materials planned for use in an advanced gasifier pilot plant will withstand the environments in a commercial gasifier. Pratt & Whitney Rocketdyne (PWR) has developed and designed the cooled liner test assembly article that will be tested at CANMET Energy Technology Centre (CETC-O) in Ottawa, Ontario, Canada (CETC-O). The Test Plan TP-00364 is duplicated in its entirety, with formatting changes to comply with the format required for this Topical Report. The table of contents has been modified to include the additional material required by this topical report. Test Request example and drawings of non-proprietary nature are also included as appendices.

Mark Fitzsimmons; Alan Darby; Fred Widman

2005-10-30T23:59:59.000Z

418

Drug Testing for New Clearance Holders  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Drug Testing Prerequisite for DOE Security Clearance Applicants Drug Testing Prerequisite for DOE Security Clearance Applicants The following matrix identifies those individuals required to have a current negative drug test as a prerequisite for being processed for a security clearance. A current test is one taken within 60 calendar days of the individual's SF-86/SF-86C signature date. For those cases where no such form is collected (e.g. reciprocity) the test must have been taken within 60 calendar days of the date of the request for security clearance. Current Status Clearance Action Test Required? Uncleared - Applicant Grant (Q/L, T/S/C) Yes Previously Cleared DOE-now uncleared DOE Reinstate (Q/L, T/S/C) Yes* Coming from another Federal agency, regardless of clearance status Grant (Q/L, T/S/C) Yes**

419

Drug Testing for New Clearance Holders  

NLE Websites -- All DOE Office Websites (Extended Search)

Drug Testing Prerequisite for DOE Security Clearance Applicants Drug Testing Prerequisite for DOE Security Clearance Applicants The following matrix identifies those individuals required to have a current negative drug test as a prerequisite for being processed for a security clearance. A current test is one taken within 60 calendar days of the individual's SF-86/SF-86C signature date. For those cases where no such form is collected (e.g. reciprocity) the test must have been taken within 60 calendar days of the date of the request for security clearance. Current Status Clearance Action Test Required? Uncleared - Applicant Grant (Q/L, T/S/C) Yes Previously Cleared DOE-now uncleared DOE Reinstate (Q/L, T/S/C) Yes* Coming from another Federal agency, regardless of clearance status Grant (Q/L, T/S/C) Yes**

420

CANMET Gasifier Liner Coupon Material Test Plan  

SciTech Connect

The test plan detailed in this topical report supports Task 1 of the project titled ''Development of Technologies and Capabilities for Coal Energy Resources - Advanced Gasification Systems Development (AGSD)''. The purpose of these tests is to verify that materials planned for use in an advanced gasifier pilot plant will withstand the environments in a commercial gasifier. Pratt & Whitney Rocketdyne (PWR) has developed and designed the cooled liner test assembly article that will be tested at CANMET Energy Technology Centre (CETC-O) in Ottawa, Ontario, Canada (CETC-O). The Test Plan TP-00364 is duplicated in its entirety, with formatting changes to comply with the format required for this Topical Report. The table of contents has been modified to include the additional material required by this topical report. Test Request example and drawings of non-proprietary nature are also included as appendices.

Mark Fitzsimmons; Alan Darby; Fred Widman

2005-10-30T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Requirements model generation to support requirements elicitation: the Secure Tropos experience  

Science Conference Proceedings (OSTI)

In recent years several efforts have been devoted by researchers in the Requirements Engineering community to the development of methodologies for supporting designers during requirements elicitation, modeling, and analysis. However, these methodologies ... Keywords: Lightweight text analysis, Model generation

Nadzeya Kiyavitskaya; Nicola Zannone

2008-06-01T23:59:59.000Z

422

Calmac Ice Storage Test report  

DOE Green Energy (OSTI)

The Ice Storage Test Facility (ISTF) is designed to test commercial ice storage systems. Calmac provided a storage tank equipped with coils designed for use with a secondary fluid system. The Calmac ice storage system was tested over a wide range of operating conditions. Measured system performance during charging was similar to that reported by the manufacturer. Both the measured average and minimum brine temperatures were in close agreement with Calmac's literature values, and the ability to fully charge the tank was relatively unaffected by charging rate and brine flow rate. During discharge cycles, the storage tank outlet temperature was strongly affected by the discharge rate. The discharge capacity was dependent upon both the selected discharge rate and maximum allowable tank outlet temperature. Based on these tests, storage tank selection must depend most strongly on the discharge conditions required to serve the load. This report describes Calmac system performance fully under both charging and discharging conditions. Companion reports describe ISTF test procedures and ice-making efficiency test results that are common to many of the units tested. 11 refs., 31 figs., 9 tabs.

Stovall, T.K.

1991-08-01T23:59:59.000Z

423

LCLS Heavy Met Outgassing Tests  

Science Conference Proceedings (OSTI)

A Heavy Met that is 95% tungsten, 3% nickel and 2% iron and sintered to 100% density and is Ultra High Vacuum (UHV) compatible is proposed for use as the X-ray slit in the Front End Enclosure and the Fixed Mask for the Linac Coherent Light Source (LCLS). The Heavy Met was tested in the LLNL Vacuum Sciences and Engineering Lab (VSEL) to determine its outgassing rate and its overall compatibility with the vacuum requirements for LCLS.

Kishiyama, K. I.

2010-12-01T23:59:59.000Z

424

Turbine Oil Lubrication Compatibility Testing  

Science Conference Proceedings (OSTI)

EPRI's Nuclear Maintenance Application Center (NMAC) has been assisting member utilities with Lubrication issues for a number of years. This assistance includes providing answers to lubrication related problems over the phone, testing samples sent by members, providing written answers when required, publication of the NMAC newsletter (Lube Notes) once a year, and providing a Lubrication Guide which provides guidance on lubrication technology and practices that relate to the nuclear power industry. Part o...

2004-07-27T23:59:59.000Z

425

Error analysis in wind turbine field testing  

DOE Green Energy (OSTI)

In wind turbine field testing, one of the most important issues is understanding and accounting for data errors. Extended dynamic testing of wind turbines requires a thorough uncertainty analysis and a regimen of quality assurance steps in order to preserve accuracy. Test objectives need to be identified to determine the accuracy requirements of any data measurement, collection, and analysis process. Frequently, the uncertainty analysis reveals that the major sources of error can be allowed for with careful calibration and signal drift tracking procedures. This paper offers a basis for the discussion and development of a repeatable and accurate process to track errors and account for them in data processing.

McNiff, B [McNiff Light Industries, Carlisle, MA (United States); Simms, D [National Renewable Energy Lab., Golden, CO (United States)

1994-08-01T23:59:59.000Z

426

W-026, acceptance test report manipulator system  

Science Conference Proceedings (OSTI)

The purpose of the WRAP Manipulator System Acceptance Test Plan (ATP) is to verify that the 4 glovebox sets of WRAP manipulator components, including rail/carriage, slave arm, master controller and auxiliary equipment, meets the requirements of the functional segments of 14590 specification. The demonstration of performance elements of the ATP are performed as a part of the Assembly specifications. Manipulator integration is integrated in the performance testing of the gloveboxes. Each requirement of the Assembly specification will be carried out in conjunction with glovebox performance tests.

Watson, T.L.

1997-04-15T23:59:59.000Z

427

Test report for cesium powder and pellets inner container decontamination method determination test  

SciTech Connect

This report documents the decontamination method determination testing that was performed on three cesium powder and pellets inner container test specimens The test specimens were provided by B and W Hanford Company (BVMC). The tests were conducted by the Numatec Hanford Company (NHC), in the 305 Building. Photographic evidence was also provided by NHC. The Test Plan and Test Report were provided by Waste Management Federal Services, Inc., Northwest Operations. Witnesses to testing included a test engineer, a BC project engineer, and a BC Quality Assurance (QA) representative. The Test Plan was modified with the mutual decision of the test engineer, the BWHC project engineer, and the BVMC QA representative. The results of this decision were written in red (permanent type) ink on the official copy of the test procedure, Due to the extent of the changes, a summary of the test results are provided in Section 3.0 of this Test Report. In addition, a copy of the official copy field documentation obtained during testing is included in Appendix A. The original Test Plan (HNF-2945) will be revised to indicate that extensive changes were required in the field during testing, however, the test documentation will stand as is (i.e., it will not be retyped, text shaded, etc.) due to the inclusion of the test parameters and results into this Test Report.

Kelly, D.L.

1998-08-17T23:59:59.000Z

428

Concrete Electrical Conductivity Test  

Science Conference Proceedings (OSTI)

Concrete Electrical Conductivity Test. Description/Summary: ... Details. Type of software: Virtual concrete electrical conductivity test. Authors: ...

2013-06-11T23:59:59.000Z

429

Standards Testing Infrastructure  

Science Conference Proceedings (OSTI)

... Group Leader Information Technology Laboratory Software and ... in collaboration with health IT stakeholders ... a variety of testing services: The testing ...

2011-02-02T23:59:59.000Z

430

Special Tests for Thermometry  

Science Conference Proceedings (OSTI)

Special Tests for Thermometry. ... Proficiency-test artifacts (eg SPRTs); Bridge certification; Evaluation of prototype thermometric devices. ...

2013-06-11T23:59:59.000Z

431

Laboratory Corrosion Tests  

Science Conference Proceedings (OSTI)

Table 2   Laboratory corrosion tests...Salt spray test NaCl solution Ocean climate Acetic acid salt spray test NaCl + CH 3 COOH Salted roads Copper-accelerated acetic acid salt spray test As in acetic acid salt spray test As in acetic acid salt spray test, but more aggressive Immersion tests Artificial sweat test � Wearing of decorative...

432

Home Smoke Alarm Tests  

Science Conference Proceedings (OSTI)

... alarm technologies in a controlled laboratory test ... arrangements and maximize the test instrumentation. ... Centers for Disease Control and Prevention ...

2013-07-07T23:59:59.000Z

433

Requirements for a Standard Test to Rate the Durability of PV Modules at System Voltage (Presentation)  

DOE Green Energy (OSTI)

Degradation modes in photovoltaic modules under system bias voltage stress are described and classified.

Hacke, P.; Terwilliger, K.; Glick, S.; Kempe, M.; Kurtz, S.; Bennett, I.; Kloos, M.

2011-02-01T23:59:59.000Z

434

Short Sample Testing Facility for the Superconducting Super Collider: Requirements and Development Status  

E-Print Network (OSTI)

Office of High Energy and Nuclear Physics, High EnergyOffice of High Energy and Nuclear Physics, High Energy

Zbasnik, J.

2011-01-01T23:59:59.000Z

435

Ahab's leg: exploring the issues of communicating semi-formal requirements to the final users  

Science Conference Proceedings (OSTI)

In this paper, we present our experience in using narrative scenarios as a tool to communicate and validate semi-formal requirements with the stakeholders in a large software project. The process of translating the semiformal language of Tropos into ... Keywords: goal-oriented requirements engineering, persona, scenario, user-centred design

Chiara Leonardi; Luca Sabatucci; Angelo Susi; Massimo Zancanaro

2010-06-01T23:59:59.000Z

436

Crush Testing at Oak Ridge National Laboratory  

SciTech Connect

The dynamic crush test is required in the certification testing of some small Type B transportation packages. International Atomic Energy Agency regulations state that the test article must be 'subjected to a dynamic crush test by positioning the specimen on the target so as to suffer maximum damage.' Oak Ridge National Laboratory (ORNL) Transportation Technologies Group performs testing of Type B transportation packages, including the crush test, at the National Transportation Research Center in Knoxville, Tennessee (United States). This paper documents ORNL's experiences performing crush tests on several different Type B packages. ORNL has crush tested five different drum-type package designs, continuing its 60 year history of RAM package testing. A total of 26 crush tests have been performed in a wide variety of package orientations and crush plate CG alignments. In all cases, the deformation of the outer drum created by the crush test was significantly greater than the deformation damage caused by the 9 m drop test. The crush test is a highly effective means for testing structural soundness of smaller nondense Type B shipping package designs. Further regulatory guidance could alleviate the need to perform the crush test in a wide range of orientations and crush plate CG alignments.

Feldman, Matthew R [ORNL

2011-01-01T23:59:59.000Z

437

Statistical Inference: Hypothesis Test  

E-Print Network (OSTI)

1 Statistical Inference: Hypothesis Test GOG 502/PLN 504 Youqin Huang 1 Review: The Z t ( )± Today's topic: Hypothesis Tests What is hypothesis test? Elements, steps, types of hypothesis test Significance test for a mean Small vs. large sample Significance test for proportion GOG 502/PLN 504 Youqin

Huang, Youqin

438

Sequence-Length Requirements for Phylogenetic Methods  

E-Print Network (OSTI)

We study the sequence lengths required by neighbor-joining, greedy parsimony, and a phylogenetic reconstruction method (DCM NJ +MP) based on disk-covering and the maximum parsimony criterion. We use extensive simulations based on random birth-death trees, with controlled deviations from ultrametricity, to collect data on the scaling of sequence-length requirements for each of the three methods as a function of the number of taxa, the rate of evolution on the tree, and the deviation from ultrametricity. Our experiments show that DCM NJ +MP has consistently lower sequence-length requirements than the other two methods when trees of high topological accuracy are desired, although all methods require much longer sequences as the deviation from ultrametricity or the height of the tree grows. Our study has significant implications for large-scale phylogenetic reconstruction (where sequence-length requirements are a crucial factor), but also for future performance analyses in phylogenetics (since deviations from ultrametricity are proving pivotal).

Bernard M. E. Moret; Usman Roshan; Tandy Warnow; Y Warnow

2002-01-01T23:59:59.000Z

439

Massachusetts Large Blade Test Facility Final Report  

DOE Green Energy (OSTI)

Project Objective: The Massachusetts Clean Energy Center (CEC) will design, construct, and ultimately have responsibility for the operation of the Large Wind Turbine Blade Test Facility, which is an advanced blade testing facility capable of testing wind turbine blades up to at least 90 meters in length on three test stands. Background: Wind turbine blade testing is required to meet international design standards, and is a critical factor in maintaining high levels of reliability and mitigating the technical and financial risk of deploying massproduced wind turbine models. Testing is also needed to identify specific blade design issues that may contribute to reduced wind turbine reliability and performance. Testing is also required to optimize aerodynamics, structural performance, encourage new technologies and materials development making wind even more competitive. The objective of this project is to accelerate the design and construction of a large wind blade testing facility capable of testing blades with minimum queue times at a reasonable cost. This testing facility will encourage and provide the opportunity for the U.S wind industry to conduct more rigorous testing of blades to improve wind turbine reliability.

Rahul Yarala; Rob Priore

2011-09-02T23:59:59.000Z

440

On-Chip Test Infrastructure Design for Optimal Multi-Site Testing of System Chips  

E-Print Network (OSTI)

Multi-site testing is a popular and effective way to increase test throughput and reduce test costs. We present a test throughput model, in which we focus on wafer testing, and consider parameters like test time, index time, abort-on-fail, and contact yield. Conventional multi-site testing requires sufficient ATE resources, such as ATE channels, to allow to test multiple SOCs in parallel. In this paper, we design and optimize on-chip DfT, in order to maximize the test throughput for a given SOC and ATE. The on-chip DfT consists of an E-RPCT wrapper, and, for modular SOCs, module wrappers and TAMs. We present experimental results for a Philips SOC and several ITC'02 SOC Test Benchmarks.

Goel, Sandeep Kumar

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

MRS Preliminary Site Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MRS Preliminary Site Requirements MRS Preliminary Site Requirements MRS Preliminary Site Requirements In the November 1989 Report to Congress on Reassessment of the Civilian Radioactive Waste Management Program (DOE/RW-0247), the Secretary of Energy announced an initiative for developing a monitored retrievable storage (MRS) facility that is to start spent-fuel acceptance in 1998. This facility, which will be licensed by the U.S. Nuclear Regulatory Commission (NRC), will receive spent fuel from commercial nuclear power plants and provide a limited amount of storage for this spent fuel. When a geologic repository starts operations, the MRS facility will also stage spent-fuel shipments to the repository. By law, storage at the MRS facility is to be temporary, with permanent disposal provided in a geologic repository to be

442

World nuclear fuel cycle requirements 1991  

Science Conference Proceedings (OSTI)

The nuclear fuel cycle consists of mining and milling uranium ore, processing the uranium into a form suitable for generating electricity, burning'' the fuel in nuclear reactors, and managing the resulting spent nuclear fuel. This report presents projections of domestic and foreign requirements for natural uranium and enrichment services as well as projections of discharges of spent nuclear fuel. These fuel cycle requirements are based on the forecasts of future commercial nuclear power capacity and generation published in a recent Energy Information Administration (EIA) report. Also included in this report are projections of the amount of spent fuel discharged at the end of each fuel cycle for each nuclear generating unit in the United States. The International Nuclear Model is used for calculating the projected nuclear fuel cycle requirements. 14 figs., 38 tabs.

Not Available

1991-10-10T23:59:59.000Z

443

Tracking Quintessence Would Require Two Cosmic Coincidences  

E-Print Network (OSTI)

Good tracking requires that the quintessence energy fraction slowly increase while the roll $\\lambda\\equiv -d\\ln V/\\varkappa d\\phi$ slowly decreases, but is not yet truly slow-rolling. The supernova bound on the present quintessence equation of state requires either (1) a cosmological constant or other fine-tuned "crawling quintessence" or (2) "roll-over quintessence" that tracked until recently, but now became slow rolling, because of a sharp increase in potential curvature. Thus, fine-tuning is required by constant equation of state and inverse power potentials, but can be avoided by the SUGRA and Skordis-Albrecht potentials and other good trackers, provided quintessence energy domination and slow roll {\\em both} began only recently. This makes the time in which we live special in {\\em two} respects.

Sidney Bludman

2004-03-22T23:59:59.000Z

444

NBP RFI: Communications Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NBP RFI: Communications Requirements NBP RFI: Communications Requirements NBP RFI: Communications Requirements Cleco Corporation greatly appreciates the opportunity to provide information to the Department of Energy (DOE) on the communications needs of utilities. Cleco is an energy services company based in central Louisiana, serving approximately 276,000 residential, commercial and industrial customers since 1934. Cleco manages over 3,000 megawatts of electric capacity through its regulated Cleco Power LLC and unregulated Cleco Midstream Resources LLC businesses, utilizing a diverse fuel mix of lignite, coal, petcoke and natural gas. With 1,300 employees, Cleco manages and operates 70 transmission substations connected via 1,300 miles of transmission lines, together feeding over 350 distribution substations,

445

Requirements for Wind Development | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Requirements for Wind Development Requirements for Wind Development Requirements for Wind Development < Back Eligibility Commercial Construction Industrial Installer/Contractor Utility Savings Category Wind Buying & Making Electricity Program Info State Oklahoma Program Type Solar/Wind Permitting Standards In 2010, Oklahoma passed HB 2973, known as The Oklahoma Wind Energy Development Act. The bill becomes effective January 1, 2011. The Act provides sets rules for owners of wind energy facilities related to decommissioning, payments, and insurance. * Within one year of abandonment of a project, equipment from wind energy facilities must be removed and the land must be returned to its condition prior to the facility construction, except for roads. * After 15 years of operation, wind energy facility owners must file an

446

MRS Preliminary Site Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MRS Preliminary Site Requirements MRS Preliminary Site Requirements MRS Preliminary Site Requirements In the November 1989 Report to Congress on Reassessment of the Civilian Radioactive Waste Management Program (DOE/RW-0247), the Secretary of Energy announced an initiative for developing a monitored retrievable storage (MRS) facility that is to start spent-fuel acceptance in 1998. This facility, which will be licensed by the U.S. Nuclear Regulatory Commission (NRC), will receive spent fuel from commercial nuclear power plants and provide a limited amount of storage for this spent fuel. When a geologic repository starts operations, the MRS facility will also stage spent-fuel shipments to the repository. By law, storage at the MRS facility is to be temporary, with permanent disposal provided in a geologic repository to be

447

Stack Height Requirements (Ohio) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Stack Height Requirements (Ohio) Stack Height Requirements (Ohio) Stack Height Requirements (Ohio) < Back Eligibility Industrial Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Utility Program Info State Ohio Program Type Environmental Regulations Provider Ohio Environmental Protection Agency This chapter of the law establishes that the Ohio Environmental Protection Agency provides regulations for stacks for industrial facilities. "Stack" means any chimney, flue, conduit or duct arranged to conduct any emissions to the ambient air, excluding flares. "Stack height" means the distance from the ground-level elevation at the base of the stack to the crown of the stack. If a stack arises from a building or other structure, the ground-level elevation of that building or structure will be

448

CONTENTS RESEARCH COMPLIANCE REPORTING REQUIREMENTS PARAGRAPH  

E-Print Network (OSTI)

1. PURPOSE. This Veterans Health Administration Handbook sets forth the requirements for reporting certain research events to facility officials, relevant research review committees, and the Office of Research Oversight (ORO). NOTE: This Handbook does not preempt or otherwise alter any other applicable research reporting requirements, whether within the Department of Veterans Affairs (VA) or involving other Federal or state agencies or commercial sponsors. 2. SUMMARY OF MAJOR CHANGES. This revised VHA Handbook: a. Provides clarifications and technical corrections to the previous version of the Handbook to specify requirements for reporting certain research events to facility officials, relevant research review committees, and the ORO. b. This Handbook assigns responsibilities related to reporting research events to the ORO,

Robert A. Petzel

2010-01-01T23:59:59.000Z

449

Security requirements and recommendations for Advanced Meters and Home Area Networks  

Science Conference Proceedings (OSTI)

This report describes the testing required to ensure the proper long-term functioning of an installed home area network (HAN) at a utility customers premises. The document investigates the test parameters that should be evaluated after a utility’s installation of a HAN system at its customers premises to ensure statistically reliable performance for the life of the system. To aid utilities in their evaluations, this report provides the theoretical basis for the development of installation test procedures...

2009-06-30T23:59:59.000Z

450

Microsoft Word - S07566_Requirements.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 2012 LMS/FUSRAP/S07566 Rev. 1 This page intentionally left blank LMS/FUSRAP/S07566 Rev. 1 Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites This document supersedes DOE-LM/GJ1242-2006, Long-Term Surveillance and Maintenance Needs Assessment for the 25 DOE FUSRAP Sites (S01649), December 2006 March 2012 This page intentionally left blank U.S. Department of Energy LTS&M Requirements for Remediated FUSRAP Sites March 2012 Doc. No. S07566, Rev. 1 Page i Contents Executive Summary ....................................................................................................................... iii 1.0 Acid/Pueblo Canyon, New Mexico, Site ...............................................................................1

451

Nuclear Power and the World's Energy Requirements  

E-Print Network (OSTI)

The global requirements for energy are increasing rapidly as the global population increases and the under-developed nations become more advanced. The traditional fuels used in their traditional ways will become increasingly unable to meet the demand. The need for a review of the energy sources available is paramount, although the subsequent need to develop a realistic strategy to deal with all local and global energy requirements is almost as important. Here attention will be restricted to examining some of the claims and problems of using nuclear power to attempt to solve this major question.

V. Castellano; R. F. Evans; J. Dunning-Davies

2004-06-10T23:59:59.000Z

452

Ootw Tool Requirements in Relation to JWARS  

Science Conference Proceedings (OSTI)

This document reports the results of the CMke of the Secretary of Defense/Program Analysis & Evaluation (OSD/PA&E) sponsored project to identify how Operations Other Than War (OOTW) tool requirements relate to the Joint Warfare Simulation (JWARS) and, more generally, to joint analytical modeling and simulation (M&S) requirements. It includes recommendations about which OOTW tools (and functionality within tools) should be included in JWARS, which should be managed as joint analytical modeling and simulation (M&S) tools, and which should be left for independent development.

Hartley III, D.S.; Packard, S.L.

1998-01-01T23:59:59.000Z

453

Passive incentive requirements: a regional assessment  

DOE Green Energy (OSTI)

The nation's goal of 20% solar contribution by the turn of the century will be achieved, in part, by the construction of residences heated by virtue of their passive solar designs. These designs are not economically competitive against all conventional fuels in all locations. Some degree of government incentive will be required to assure a competitive position for these designs. A methodology is presented which is used to assess the magnitude of the government incentive required to assure feasibility. The methodology is used to provide a regional assessment for the Pacific Northwest under alternative home ownership periods and conventional fuel types.

Ben-David, S.; Kirschner, C.; Noll, S.A.; Roach, F.

1980-01-01T23:59:59.000Z

454

Model Checking Complete Requirements Specifications Using Abstraction  

Science Conference Proceedings (OSTI)

Although model checking has proven remarkably effective in detecting errors in hardware designs, its success in the analysis of software specifications has been limited. Model checking algorithms for hardware verification commonly use Binary Decision ... Keywords: SCR, abstraction, model checking, requirements specification, verification

Ramesh Bharadwaj; Constance L. Heitmeyer

1999-01-01T23:59:59.000Z

455

Hoisting and Rigging: Inspection and Maintenance Requirements  

E-Print Network (OSTI)

Devices, Slings, and Rigging Hardware and Accessories (SLAC-I-730-0A21S-036) Hoisting and Rigging: PreHoisting and Rigging: Inspection and Maintenance Requirements URL: http://www-group.slac.stanford.edu/esh/eshmanual/references/hoisting Department: Field Safety and Building Inspection Program: Hoisting and Rigging Authority: ESH Manual, Chapter

Wechsler, Risa H.

456

THE REQUIREMENTS OF A FUSION DEMONSTRATION  

E-Print Network (OSTI)

, that are predicted by theory but are not yet well established experimentally. The two reactors will have the same of the commercial nuclear power business or construction of a new production reactor based on HTGR technology#12;THE REQUIREMENTS OF A FUSION DEMONSTRATION REACTOR AND THE STARLITE STUDY Robert W. Conn

Najmabadi, Farrokh

457

A requirements catalog for mobile learning environments  

Science Conference Proceedings (OSTI)

Mobile learning (m-learning) can be characterized by the ability to promote a strong interaction among apprentices and tutors, assuring greater motivation, convenience and flexibility to the learning process. Mobile learning environments have emerged ... Keywords: mobile learning, prioritization, requirements, systematic review

Nemésio Freitas Duarte Filho; Ellen Francine Barbosa

2013-03-01T23:59:59.000Z

458

CELL, MOLECULAR AND DEVELOPMENTAL BIOLOGY Graduation Requirements  

E-Print Network (OSTI)

CELL, MOLECULAR AND DEVELOPMENTAL BIOLOGY Graduation Requirements: A minimum 2.0 average in all in Biology III: Cell Structure and Function (2 cr.; fall) 6. BIOL 24100 Biology IV: Genetics and Molecular Biology (3 cr.; spring) 7. BIOL 24200 Laboratory in Genetics and Molecular Biology (2 cr.; spring) 8. BIOL

Jiang, Wen

459

200 area effluent treatment facility opertaional test report  

Science Conference Proceedings (OSTI)

This document reports the results of the 200 Area Effluent Treatment Facility (200 Area ETF) operational testing activities. These Operational testing activities demonstrated that the functional, operational and design requirements of the 200 Area ETF have been met and identified open items which require retesting.

Crane, A.F.

1995-10-26T23:59:59.000Z

460

A computer-controlled automated test system for fatigue and fracture testing  

SciTech Connect

A computer-controlled system consisting of a servohydraulic test machine, an in-house designed test controller, and a desktop computer has been developed for performing automated fracture toughness and fatigue crack growth testing both in the laboratory and in hot cells for remote testing of irradiated specimens. Both unloading compliance and dc-potential drop can be used to monitor crack growth. The test controller includes a dc-current supply programmer, a function generator for driving the servohydraulic test machine to required test outputs, five measurement channels (each consisting of low-pass filter, track/hold amplifier, and 16-bit analog-to-digital converter), and digital logic for various control and data multiplexing functions. The test controller connects to the computer via a 16-bit wide photo-isolated bidirectional bus. The computer, a Hewlett-Packard series 200/300, inputs specimen and test parameters from the operator, configures the test controller, stores test data from the test controller in memory, does preliminary analysis during the test, and records sensor calibrations, specimen and test parameters, and test data on flexible diskette for later recall and analysis with measured initial and final crack length information. During the test, the operator can change test parameters as necessary. 24 refs., 6 figs.

Nanstad, R.K.; Alexander, D.J.; Swain, R.L.; Hutton, J.T.; Thomas, D.L.

1989-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

PCB spill response and notification requirements  

SciTech Connect

Polychlorinated biphenyls (PCBs) are a class of organic chemicals that had become widely used in industrial applications due to their practical physical and chemical properties. Historical uses of PCBs include dielectric fluids (used in utility transformers, capacitors, etc.), hydraulic fluids, and other applications requiring stable, fire-retardant materials. Due to findings that PCBs may cause adverse health effects and due to their persistence and accumulation in the environment. The Toxic Substances Control Act (TSCA), enacted on october 11, 1976, banned the manufacture of PCBs after 1978 [Section 6(e)]. The first PCB regulations, promulgated at 40 CFR Part 761, were finalized on February 17, 1978. These PCB regulations include requirements specifying disposal methods and marking (labeling) procedures, and controlling PCB use. To assist the Department of Energy (DOE) in its efforts to comply with the TSCA statute and implementing regulations, the Office of Environmental Guidance has prepared the document ``Guidance on the Management of Polychlorinated Biphenyls (PCBs).`` That document explains the requirements specified in the statute and regulations for managing PCBs including PCB use, storage, transport, and disposal. The Environmental Protection Agency (EPA) established regulations at 40 CFR 761 Subpart G for the reporting and cleanup of spills resulting from the release of any quantity of material containing PCBs at concentrations of {ge} 50 ppm. The regulations, known collectively as the TSCA Spill Cleanup Policy, contain requirements for the notification, cleanup, decontamination verification, and recordkeeping of PCB spills. This Information Brief supplements the PCB guidance document by responding to common questions concerning PCB spill response and notification requirements. It is one of a series of Information Briefs pertinent to PCB management issues.

NONE

1994-12-01T23:59:59.000Z

462

Requirements in DOE O 5480.19, Conduct of Operations Requirements for DOE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Requirements in DOE O 5480.19, Conduct of Operations Requirements Requirements in DOE O 5480.19, Conduct of Operations Requirements for DOE Facilities Cross-referenced to DOE O 422.1, Conduct of Operations. Requirements in DOE O 5480.19, Conduct of Operations Requirements for DOE Facilities Cross-referenced to DOE O 422.1, Conduct of Operations. This is an open-book evaluation. Complete the questions, and submit your answers (hand-written or electronically) to the Training Center. Someone will check and grade your answers. If you achieve a score of at least 80%, you will receive a completion certificate. Nuclear Facility Safety Basis Fundamentals Self-Study Guide Review Questions More Documents & Publications U.S. Department of Energy Oak Ridge Operations Nuclear Facility Safety Basis Fundamentals, Self-Study Guide

463

Hybrid Electric Vehicle Testing  

NLE Websites -- All DOE Office Websites (Extended Search)

Transportation Association Conference Transportation Association Conference Vancouver, Canada December 2005 Hybrid Electric Vehicle Testing Jim Francfort U.S. Department of Energy - FreedomCAR & Vehicle Technologies Program, Advanced Vehicle Testing Activity INL/CON-05-00964 Presentation Outline * Background & goals * Testing partners * Hybrid electric vehicle testing - Baseline performance testing (new HEV models) - 1.5 million miles of HEV fleet testing (160k miles per vehicle in 36 months) - End-of-life HEV testing (rerun fuel economy & conduct battery testing @ 160k miles per vehicle) - Benchmark data: vehicle & battery performance, fuel economy, maintenance & repairs, & life-cycle costs * WWW information location Background * Advanced Vehicle Testing Activity (AVTA) - part of the

464

DOE CYBER SECURITY EBK: MINIMUM CORE COMPETENCY TRAINING REQUIREMENTS...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MINIMUM CORE COMPETENCY TRAINING REQUIREMENTS DOE CYBER SECURITY EBK: MINIMUM CORE COMPETENCY TRAINING REQUIREMENTS MINIMUM CORE COMPETENCY TRAINING REQUIREMENTS DOE CYBER SECURITY...

465

DOE CYBER SECURITY EBK: CORE COMPETENCY TRAINING REQUIREMENTS...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CORE COMPETENCY TRAINING REQUIREMENTS: CA DOE CYBER SECURITY EBK: CORE COMPETENCY TRAINING REQUIREMENTS: CA DOE CYBER SECURITY EBK: CORE COMPETENCY TRAINING REQUIREMENTS. Key Cyber...

466

Large Scale Computing and Storage Requirements for Fusion Energy...  

NLE Websites -- All DOE Office Websites (Extended Search)

at NERSC HPC Requirements Reviews Requirements for Science: Target 2014 Fusion Energy Sciences (FES) Large Scale Computing and Storage Requirements for Fusion Energy...

467

Audit of Staffing Requirements for the Strategic Petroleum Reserve...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Staffing Requirements for the Strategic Petroleum Reserve, IG-0370 Audit of Staffing Requirements for the Strategic Petroleum Reserve, IG-0370 Audit of Staffing Requirements for...

468

Education, Job Requirements, and Commuting: An Analysis of Network Flows  

E-Print Network (OSTI)

Education, Job Requirements,and Commuting: Analysis of Ne~f,,/ Education, Job Requirements, and Commuting: Analysis ofin Education, Job Requirements, and Commuting: Analysis of

Harsman, Bjorn; Quigley, John M.

1998-01-01T23:59:59.000Z

469

Large Scale Computing and Storage Requirements for Basic Energy...  

NLE Websites -- All DOE Office Websites (Extended Search)

at NERSC HPC Requirements Reviews Requirements for Science: Target 2014 Basic Energy Sciences (BES) Large Scale Computing and Storage Requirements for Basic Energy...

470

Applications of Cermets to Meet Operational Waste Package Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Operational Waste Package Requirements Applications of Cermets to Meet Operational Waste Package Requirements The cermet could meet three operational requirements for the waste...

471

Advanced Thermal Simulator Testing: Thermal Analysis and Test Results  

SciTech Connect

Work at the NASA Marshall Space Flight Center seeks to develop high fidelity, electrically heated thermal simulators that represent fuel elements in a nuclear reactor design to support non-nuclear testing applicable to the potential development of a space nuclear power or propulsion system. Comparison between the fuel pins and thermal simulators is made at the outer fuel clad surface, which corresponds to the outer sheath surface in the thermal simulator. The thermal simulators that are currently being tested correspond to a liquid metal cooled reactor design that could be applied for Lunar surface power. These simulators are designed to meet the geometric and power requirements of a proposed surface power reactor design, accommodate testing of various axial power profiles, and incorporate imbedded instrumentation. This paper reports the results of thermal simulator analysis and testing in a bare element configuration, which does not incorporate active heat removal, and testing in a water-cooled calorimeter designed to mimic the heat removal that would be experienced in a reactor core.

Bragg-Sitton, Shannon M.; Dickens, Ricky; Dixon, David; Reid, Robert; Adams, Mike; Davis, Joe [NASA Marshall Space Flight Center, Nuclear Systems Branch/ER24, MSFC, AL 35812 (United States)

2008-01-21T23:59:59.000Z

472

DOE Testing Reveals Samsung Refrigerator Does Not Meet Energy Star  

NLE Websites -- All DOE Office Websites (Extended Search)

Testing Reveals Samsung Refrigerator Does Not Meet Energy Star Testing Reveals Samsung Refrigerator Does Not Meet Energy Star Requirements DOE Testing Reveals Samsung Refrigerator Does Not Meet Energy Star Requirements March 16, 2010 - 4:28pm Addthis DOE-initiated testing has revealed that a Samsung refrigerator (model RF26VAB), which the company had claimed was Energy Star compliant, consumed more energy than permitted by the Energy Star program. Test results for the Samsung model at issue show that, when tested in accordance with DOE's test procedure, it consumed between 7 and 11.4 percent more energy than the Energy Star requirement. Samsung is no longer manufacturing this model, although it may still be available from some retail outlets. Based on this testing, DOE is referring Samsung Model RF26VAB to the U.S.

473

CANMET Gasifier Liner Coupon Material Test Report  

Science Conference Proceedings (OSTI)

This report provides detailed test results consisting of test data and post-test inspections from Task 1 ''Cooled Liner Coupon Development and Test'' of the project titled ''Development of Technologies and Capabilities for Coal Energy Resources--Advanced Gasification Systems Development (AGSD)''. The primary objective of this development and test program is to verify that ceramic matrix composite (CMC) liner materials planned for use in an advanced gasifier pilot plant will successfully withstand the environments in a commercial gasifier. Pratt & Whitney Rocketdyne (PWR) designed and fabricated the cooled liner test assembly article that was tested in a slagging gasifier at CANMET Energy Technology Center (CETC-O) in Ottawa, Ontario, Canada. The test program conducted in 2006 met the objective of operating the cooled liner test article at slagging conditions in a small scale coal gasifier at CETC-O for over the planned 100 hours. The test hardware was exposed to at least 30 high temperature excursions (including start-up and shut-down cycles) during the test program. The results of the testing has provided valuable information on gasifier startup and required cooling controls in steady state operation of future advanced gasifiers using similar liners. The test program also provided a significant amount of information in the areas of CMC materials and processing for improved capability in a gasifier environment and insight into CMC liner fabrication that will be essential for near-term advanced gasifier projects.

Mark Fitzsimmons; Dave Grimmett; Bryan McEnerney

2007-01-31T23:59:59.000Z

474

ZiaTest  

NLE Websites -- All DOE Office Websites (Extended Search)

Trinity-NERSC8-RFP NERSC-8 Trinity Benchmarks ZiaTest ZiaTest Description This test executes a new proposed standard benchmark method for MPI startup that is intended to...

475

The Turing Test*  

Science Conference Proceedings (OSTI)

Turing's test has been much misunderstood. Recently unpublished material by Turing casts fresh light on his thinking and dispels a number of philosophical myths concerning the Turing test. Properly understood, the Turing test withstands objections that ...

B. Jack Copeland

2000-11-01T23:59:59.000Z

476

Test | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Test Test Summary Test More Documents & Publications Evaluation Report: OAS-M-12-01 Evaluation Report: OAS-M-11-01 Evaluation Report: OAS-L-13-01...

477

ZiaTest  

NLE Websites -- All DOE Office Websites (Extended Search)

ZiaTest ZiaTest Description This test executes a new proposed standard benchmark method for MPI startup that is intended to provide a realistic assessment of both launch and wireup...

478

Hybrid Electric Vehicle Testing  

NLE Websites -- All DOE Office Websites (Extended Search)

- 1.5 million miles of HEV fleet testing (160k miles per vehicle in 36 months) - End-of-life HEV testing (rerun fuel economy & conduct battery testing @ 160k miles per vehicle) -...

479

Marking Requirements | Scientific and Technical Information Program  

Office of Scientific and Technical Information (OSTI)

Submittal Basics Submittal Basics Marking Requirements Print page Print page Email page Email page Categories of Controlled Unclassified STI DOE and Major Site/Facility Management Contractors Sample Cover and Title Page for Unclassified Unlimited STI Sample Cover and Title Page for Controlled Unclassified STI Financial Assistance Recipients and Non-major Contractors Sample Cover and Title Page for Unclassified Unlimited STI Sample Cover and Title Page for Controlled Unclassified STI Resources for classified and controlled unclassified marking requirements: DOE CMPC Marking Resource DOE O 475.2A, Identifying Classified Information 10 CFR 1017, Identification and Protection of Unclassified Controlled Nuclear Information DOE M 471.3-1, Manual for Identifying and Protecting Official Use

480

Depleted Uranium Uses: Regulatory Requirements and Issues  

NLE Websites -- All DOE Office Websites (Extended Search)

1 Depleted Uranium Uses Depleted Uranium Uses Regulatory Requirements Regulatory Requirements and Issues and Issues Nancy L. Ranek Nancy L. Ranek Argonne National Laboratory Argonne National Laboratory August 5, 1998 August 5, 1998 Beneficial Reuse '98 Beneficial Reuse '98 Knoxville, TN Knoxville, TN NOTES Work Performed for: Office of Facilities (NE-40) Office of Nuclear Energy, Science and Technology U.S. Department of Energy Work Performed by: Environmental Assessment Division Argonne National Laboratory 955 L'Enfant Plaza North, S.W. Washington, D.C. 20024 Phone: 202/488-2417 E-mail: ranekn@smtplink.dis.anl.gov 2 2 2 Programmatic Environmental Programmatic Environmental Impact Statement (PEIS) Impact Statement (PEIS) Draft PEIS Published 12/97 * Preferred Alternative = 100% Use

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Documentation Requirements for Pressurized Experiment Equipment  

NLE Websites -- All DOE Office Websites (Extended Search)

Documentation Requirements for Pressurized Experiment Apparatus Documentation Requirements for Pressurized Experiment Apparatus PSSC NOTE01 15-Jan-2013 When bringing a piece of apparatus to the APS for an experiment that will involve pressure, whether it is to be used on a beamline during a measurement or in a laboratory to prepare the sample prior to the experiment, the hazards associated with the equipment must be reviewed. To review the equipment and make any recommendations, a certain level of documentation must be provided by the experimenter. The length and depth of the documentation should be commensurate with the complexity of the system. 1. Description of apparatus a. Description of the assembly and operation of the system. b. State the maximum working pressure, working fluid (liquid or gas) used to

482

Federal Prison Industries-Requirement for Market  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FLASH 2004-12 FLASH 2004-12 April 5, 2004 Federal A4:Quisition Circular (FAC) 2001-21 The following item is available via the internet at httQ://WWVv .acQnet.gov/farlF AC/fac200 1-21.i2Qf Effective Date: March 26, 2004 Federal Prison Industries-Requirement for Market 023) This interira rule amends FAR parts 8, Required Sources of Supplies and Services, 19, Small I~usiness Programs, 42, Contract Administration and Audit Services, and 52, Solicitation Provisions and Contract Clauses. This rule pJ'Ovides that no appropriated funds may be expended for the purchase of products or services offered by the Federal Prison Industries, Inc. (FPI), unless the agency ma1.:ing the purchase determines that the offered product or service provides the best value to the buying agency in accordance with the applicable procurement

483

Hydrogen Storage Requirements for Fuel Cell Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

GENERAL MOTORS GENERAL MOTORS HYDROGEN STORAGE REQUIREMENTS FOR FUEL CELL VEHICLES Brian G. Wicke GM R&D and Planning DOE Hydrogen Storage Workshop August 14-15, 2002 Argonne National Laboratory General Motors Fuel Cell Vehicles * GM fuel cell vehicle Goal - be the first to profitably sell one million fuel cell vehicles * Fuel cell powerplant must be suitable for a broad range of light-duty vehicles (not just niche) * UNCOMPROMISED performance & reliability are REQUIRED * SAFETY IS A GIVEN * Evolutionary and Revolutionary vehicle designs are included-GM AUTONOMY-as long as the customer is (more than) satisfied GENERAL MOTORS AUTONOMY GENERAL MOTORS AUTONOMY General Motors Fuel Cell Vehicles * Focus on PEM fuel cell technology * Must consider entire hydrogen storage & (unique) fuel delivery systems,

484

API Requirements for Dynamic Graph Prediction  

SciTech Connect

Given a large-scale time-evolving multi-modal and multi-relational complex network (a.k.a., a large-scale dynamic semantic graph), we want to implement algorithms that discover patterns of activities on the graph and learn predictive models of those discovered patterns. This document outlines the application programming interface (API) requirements for fast prototyping of feature extraction, learning, and prediction algorithms on large dynamic semantic graphs. Since our algorithms must operate on large-scale dynamic semantic graphs, we have chosen to use the graph API developed in the CASC Complex Networks Project. This API is supported on the back end by a semantic graph database (developed by Scott Kohn and his team). The advantages of using this API are (i) we have full-control of its development and (ii) the current API meets almost all of the requirements outlined in this document.

Gallagher, B; Eliassi-Rad, T

2006-10-13T23:59:59.000Z

485

Report of the Federal Internetworking Requirements Panel  

SciTech Connect

The Federal Internetworking Requirements Panel (FIRP) was established by the National Institute of Standards and Technology (NIST) to reassess Federal requirements for open systems networks and to recommend policy on the Government`s use of networking standards. The Panel was chartered to recommend actions which the Federal Government can take to address the short and long-term issues of interworking and convergence of networking protocols--particularly the Internet Protocol Suite (IPS) and Open Systems Interconnection (OSI) protocol suite and, when appropriate, proprietary protocols. The Panel was created at the request of the Office of Management and Budget in collaboration with the Federal Networking Council and the Federal Information Resources Management Policy Council. The Panel`s membership and charter are contained in an appendix to this report.

1994-05-31T23:59:59.000Z

486

PREPARING FOR EXASCALE: ORNL Leadership Computing Application Requirements and Strategy  

SciTech Connect

In 2009 the Oak Ridge Leadership Computing Facility (OLCF), a U.S. Department of Energy (DOE) facility at the Oak Ridge National Laboratory (ORNL) National Center for Computational Sciences (NCCS), elicited petascale computational science requirements from leading computational scientists in the international science community. This effort targeted science teams whose projects received large computer allocation awards on OLCF systems. A clear finding of this process was that in order to reach their science goals over the next several years, multiple projects will require computational resources in excess of an order of magnitude more powerful than those currently available. Additionally, for the longer term, next-generation science will require computing platforms of exascale capability in order to reach DOE science objectives over the next decade. It is generally recognized that achieving exascale in the proposed time frame will require disruptive changes in computer hardware and software. Processor hardware will become necessarily heterogeneous and will include accelerator technologies. Software must undergo the concomitant changes needed to extract the available performance from this heterogeneous hardware. This disruption portends to be substantial, not unlike the change to the message passing paradigm in the computational science community over 20 years ago. Since technological disruptions take time to assimilate, we must aggressively embark on this course of change now, to insure that science applications and their underlying programming models are mature and ready when exascale computing arrives. This includes initiation of application readiness efforts to adapt existing codes to heterogeneous architectures, support of relevant software tools, and procurement of next-generation hardware testbeds for porting and testing codes. The 2009 OLCF requirements process identified numerous actions necessary to meet this challenge: (1) Hardware capabilities must be advanced on multiple fronts, including peak flops, node memory capacity, interconnect latency, interconnect bandwidth, and memory bandwidth. (2) Effective parallel programming interfaces must be developed to exploit the power of emerging hardware. (3) Science application teams must now begin to adapt and reformulate application codes to the new hardware and software, typified by hierarchical and disparate layers of compute, memory and concurrency. (4) Algorithm research must be realigned to exploit this hierarchy. (5) When possible, mathematical libraries must be used to encapsulate the required operations in an efficient and useful way. (6) Software tools must be developed to make the new hardware more usable. (7) Science application software must be improved to cope with the increasing complexity of computing systems. (8) Data management efforts must be readied for the larger quantities of data generated by larger, more accurate science models. Requirements elicitation, analysis, validation, and management comprise a difficult and inexact process, particularly in periods of technological change. Nonetheless, the OLCF requirements modeling process is becoming increasingly quantitative and actionable, as the process becomes more developed and mature, and the process this year has identified clear and concrete steps to be taken. This report discloses (1) the fundamental science case driving the need for the next generation of computer hardware, (2) application usage trends that illustrate the science need, (3) application performance characteristics that drive the need for increased hardware capabilities, (4) resource and process requirements that make the development and deployment of science applications on next-generation hardware successful, and (5) summary recommendations for the required next steps within the computer and computational science communities.

Joubert, Wayne [ORNL; Kothe, Douglas B [ORNL; Nam, Hai Ah [ORNL

2009-12-01T23:59:59.000Z

487

AMI Risk Assessment and Security Requirements  

Science Conference Proceedings (OSTI)

Advanced Metering Infrastructure (AMI) is a transforming technology that has broad impact on the energy market and its consumers. AMI allows utilities to balance supply, demand, and capacity making a smarter, more efficient, grid by pushing aspects of grid monitoring and control out to the endpoints of delivery. Stakeholders are implementing the systems and technologies required to deploy AMI today. AMI systems promise to provide advanced energy monitoring and recording, sophisticated tariff/rate program...

2009-12-18T23:59:59.000Z

488

Methodology for assessing systems materials requirements  

SciTech Connect

A potential stumbling block to new system planning and design is imprecise, confusing, or contradictory data regarding materials - their availability and costs. A methodology is now available that removes this barrier by minimizing uncertainties regarding materials availability. Using this methodology, a planner can assess materials requirements more quickly, at lower cost, and with much greater confidence in the results. Developed specifically for energy systems, its potential application is much broader. This methodology and examples of its use are discussed.

Culver, D.H.; Teeter, R.R.; Jamieson, W.M.

1980-01-01T23:59:59.000Z

489

Advanced Vehicle Testing Activity: Testing Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

Reports NEVAmerica Baseline Performance Testing Summaries A neighborhood electric vehicle (NEV) is defined as a "low-speed vehicle" (LSV) by the National Highway Traffic...

490

Workshop on Program for Elimination of Requirements Marginal to Safety: Proceedings  

SciTech Connect

These are the proceedings of the Public Workshop on the US Nuclear Regulatory Commission`s Program for Elimination of Requirements Marginal to Safety. The workshop was held at the Holiday Inn, Bethesda, on April 27 and 28, 1993. The purpose of the workshop was to provide an opportunity for public and industry input to the program. The workshop addressed the institutionalization of the program to review regulations with the purpose of eliminating those that are marginal. The objective is to avoid the dilution of safety efforts. One session was devoted to discussion of the framework for a performance-based regulatory approach. In addition, panelists and attendees discussed scope, schedules and status of specific regulatory items: containment leakage testing requirements, fire protection requirements, requirements for environmental qualification of electrical equipment, requests for information under 10CFR50.54(f), requirements for combustible gas control systems, and quality assurance requirements.

Dey, M. [Nuclear Regulatory Commission, Washington, DC (United States). Div. of Safety Issue Resolution; Arsenault, F.; Patterson, M.; Gaal, M. [SCIENTECH, Inc., Rockville, MD (United States)

1993-09-01T23:59:59.000Z

491

Aeroderivative Gas Turbines Can Meet Stringent NOx Control Requirements  

E-Print Network (OSTI)

Gas Turbines operating in the United States are required to meet federally mandated emission standards. This article will discuss how General Electric's LM industrial aeroderivative gas turbines are meeting NOx requirements as low as 25 parts per million using steam injection. The article will also describe the technical aspects of how water or steam injection can be used to supress NOx, what emission levels GE will guarantee and detail some recently obtained test results. The side benefits of water or steam injection for controlling NOx emissions will be discussed. Steam injection has a very favorable effect on engine performance raising both the power output and efficiency. As an example, full steam injection in the GE LM5000 gas turbine increases the power output from 34 MW to 52 MW while lowering the heat rate from 9,152 Btu/kWh to 7,684 Btu/kWh when fired on natural gas. Water injection increases power output at a slightly decreased thermal efficiency. When steam is injected, NOx can be controlled to 25 ppm (referenced to 15 percent O2) which is sufficient to comply with the most stringent requirements imposed in areas where water or steam injection is considered best available control technology (BACT). Selective Catalytic Reduction (SCR) systems are currently employed in areas with Lowest Achievable Emissions Requirements. SCRs have been proposed as BACT in several areas such as the Bay area of California and the state of New Jersey. These systems are expensive to install and operate, and this cost impact can cause many projects to become economically non-viable. Cost comparisons for NOx removal using an SCR in combination with the steam injection will demonstrate the large incremental cost incurred when NOx is controlled using an SCR. Lastly, a case will be made for not imposing SCR as BACT in that it would close the door on further research and development for better, cost-effective methods of NOx control.

Keller, S. C.; Studniarz, J. J.

1987-09-01T23:59:59.000Z

492

Test Request LTFY-2  

SciTech Connect

This test request defines pre-test data for the irradiation of enriched yttrium-uranium hydride samples in the LITR C-48 facility.

1964-12-01T23:59:59.000Z

493

OMB MPI Tests  

NLE Websites -- All DOE Office Websites (Extended Search)

OMB MPI Tests OMB MPI Tests Description The Ohio MicroBenchmark suite is a collection of independent MPI message passing performance microbenchmarks developed and written at The...

494

PRACTICAL COMBINATORIAL TESTING  

Science Conference Proceedings (OSTI)

... boot-up. The initial test configuration (Figure 14) was drawn from the library of pre-computed sequence tests. Some changes ...

2012-12-13T23:59:59.000Z

495

PNGV battery test manual  

DOE Green Energy (OSTI)

This manual defines a series of tests to characterize aspects of the performance or life cycle behavior of batteries for hybrid electric vehicle applications. Tests are defined based on the Partnership for New Generation Vehicles (PNGV) program goals, although it is anticipated these tests may be generally useful for testing energy storage devices for hybrid electric vehicles. Separate test regimes are defined for laboratory cells, battery modules or full size cells, and complete battery systems. Some tests are common to all three test regimes, while others are not normally applicable to some regimes. The test regimes are treated separately because their corresponding development goals are somewhat different.

NONE

1997-07-01T23:59:59.000Z

496

Robotics Test Facility  

Science Conference Proceedings (OSTI)

... 5000 square foot) high bay, holding most of the test methods; ... to help engineers view robot performance remotely and for recording testing events. ...

2013-05-23T23:59:59.000Z

497

Test Cell Location  

NLE Websites -- All DOE Office Websites (Extended Search)

2012 Fiat 500 Test Cell Location 2WD Vehicle Setup Information Downloadable Dynamometer Database (D 3 )- Test Summary Sheet Vehicle Architecture Conventional Vehicle Dynamometer...

498

Iris Device Qualification Test  

Science Conference Proceedings (OSTI)

... Device Qualification Test (IDQT). July 15, 2013 - Slides from Workshop. Slides that give the detailed technical approach toward the IDQT tests are ...

2013-07-16T23:59:59.000Z

499

Test Cell Location  

NLE Websites -- All DOE Office Websites (Extended Search)

2013 Nissan Altima Test Cell Location 2WD Vehicle Setup Information Downloadable Dynamometer Database (D 3 )- Test Summary Sheet Vehicle Architecture Conventional Vehicle...

500

Energy Storage Testing  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Storage Testing The Advanced Vehicle Testing Activity is tasked by the U.S. Department of Energys Vehicle Technology Program to conduct various types of energy storage...