Powered by Deep Web Technologies
Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

An IEEE 1588 performance testing dashboard for power industry requirements  

Science Conference Proceedings (OSTI)

The numerous time synchronization performance requirements in the Smart Grid necessitate a set of common metrics and test methods. The test methods help to verify the ability of the network system and its components to meet the power industry's accuracy, ... Keywords: IEEE 1588, PMU, conformance testing, test methods, time synchronization

Julien Amelot; Jeffrey Fletcher; Ya-Shian Li-Baboud; Dhananjay Anand; Clement Vasseur; James Moyne

2012-03-01T23:59:59.000Z

2

Design requirements for the supercritical water oxidation test bed  

SciTech Connect

This report describes the design requirements for the supercritical water oxidation (SCWO) test bed that will be located at the Idaho National Engineering Laboratory (INEL). The test bed will process a maximum of 50 gph of waste plus the required volume of cooling water. The test bed will evaluate the performance of a number of SCWO reactor designs. The goal of the project is to select a reactor that can be scaled up for use in a full-size waste treatment facility to process US Department of Energy mixed wastes. EG&G Idaho, Inc. will design and construct the SCWO test bed at the Water Reactor Research Test Facility (WRRTF), located in the northern region of the INEL. Private industry partners will develop and provide SCWO reactors to interface with the test bed. A number of reactor designs will be tested, including a transpiring wall, tube, and vessel-type reactor. The initial SCWO reactor evaluated will be a transpiring wall design. This design requirements report identifies parameters needed to proceed with preliminary and final design work for the SCWO test bed. A flow sheet and Process and Instrumentation Diagrams define the overall process and conditions of service and delineate equipment, piping, and instrumentation sizes and configuration Codes and standards that govern the safe engineering and design of systems and guidance that locates and interfaces test bed hardware are provided. Detailed technical requirements are addressed for design of piping, valves, instrumentation and control, vessels, tanks, pumps, electrical systems, and structural steel. The approach for conducting the preliminary and final designs and environmental and quality issues influencing the design are provided.

Svoboda, J.M.; Valentich, D.J.

1994-05-01T23:59:59.000Z

3

An assessment of testing requirement impacts on nuclear thermal propulsion ground test facility design  

SciTech Connect

Programs to develop solid core nuclear thermal propulsion (NTP) systems have been under way at the Department of Defense (DoD), the National Aeronautics and Space Administration (NASA), and the Department of Energy (DOE). These programs have recognized the need for a new ground test facility to support development of NTP systems. However, the different military and civilian applications have led to different ground test facility requirements. The Department of Energy (DOE) in its role as landlord and operator of the proposed research reactor test facilities has initiated an effort to explore opportunities for a common ground test facility to meet both DoD and NASA needs. The baseline design and operating limits of the proposed DoD NTP ground test facility are described. The NASA ground test facility requirements are reviewed and their potential impact on the DoD facility baseline is discussed.

Shipers, L.R.; Ottinger, C.A.; Sanchez, L.C.

1993-10-25T23:59:59.000Z

4

10-MWe pilot-plant-receiver panel test requirements document solar thermal test facility  

DOE Green Energy (OSTI)

Testing plans for a full-scale test receiver panel and supporting hardware which essentially duplicate both physically and functionally, the design planned for the Barstow Solar Pilot Plant are presented. Testing is to include operation during normal start and shutdown, intermittent cloud conditions, and emergencies to determine the panel's transient and steady state operating characteristics and performance under conditions equal to or exceeding those expected in the pilot plant. The effects of variations of input and output conditions on receiver operation are also to be investigated. Test hardware are described, including the pilot plant receiver, the test receiver assembly, receiver panel, flow control, electrical control and instrumentation, and structural assembly. Requirements for the Solar Thermal Test Facility for the tests are given. The safety of the system is briefly discussed, and procedures are described for assembly, installation, checkout, normal and abnormal operations, maintenance, removal and disposition. Also briefly discussed are quality assurance, contract responsibilities, and test documentation. (LEW)

Not Available

1978-08-25T23:59:59.000Z

5

10-MWe pilot-plant-receiver-panel test-requirements document: Solar Thermal Test Facility  

DOE Green Energy (OSTI)

Plans are presented for insolation testing of a full-scale test receiver panel and supporting hardware which essentially duplicate both physically and functionally the design planned for the 10 MWe pilot plant. Testing includes operation during normal start and shutdown, intermittent cloud conditions, and emergencies to determine the transient and steady state operating characteristics and performance under conditions equal to or exceeding those expected in the pilot plant. The effects of variations of input and output conditions on receiver operation are also to be investigated. A brief description of the pilot plant receiver subsystem is presented, followed by a detailed description of the receiver assembly to be tested at the Solar Thermal Test Facility. Major subassemblies are described, including the receiver panel, flow control, electrical control and instrumentation, and the structural assembly. Requirements of the Solar Thermal Test Facility for the tests are given. System safety measures are described. The tests, operating conditions, and expected results are presented. Quality assurance, task responsibilities, and test documentation are also discussed. (LEW)

Not Available

1978-06-10T23:59:59.000Z

6

Derived Test Requirements for FIPS PUB 140-2, Security ...  

Science Conference Proceedings (OSTI)

... DC or DC-to-DC modules), transformers, input power ... cryptographic module is in a self-test condition. ... verify that the self-test conditions specified in ...

2011-10-19T23:59:59.000Z

7

Vehicle Infrastructure Connectivity and Communications -- Requirements and Testing  

Science Conference Proceedings (OSTI)

It is expected that consumers will charge electric vehicles in a variety of locations under varying weather conditions. In order to ensure that charging can be safely carried out in conditions that may include moisture, rain, and snow, the National Electric Code (NEC) requires that certain safety features be provided for as part of plug-in electric vehicle (PEV) charging equipment. While the NEC defines electric vehicle supply equipment (EVSE) more broadly, the term EVSE is commonly used to refer only to...

2011-12-30T23:59:59.000Z

8

Testing site size requirements in chemisorption: experiment and theory  

DOE Green Energy (OSTI)

''Ensemble requirements'' in surface chemistry refer to the number and shape of contiguous empty sites necessary for chemisorption of a particular molecule. Ensemble effects can play a major role in directing the course of surface reactions, leading, for example, to dramatic changes in catalytic selectivity when the active metal component is diluted upon alloying with an inert metal. We will review here fundamental surface science studies that have attempted to probe this site size requirement by diluting active sites on a single crystal surface with an inert metal overlayer. We will emphasize recent results in our lab on the interaction of simple molecules (CO, H/sub 2/, O/sub 2/) with Cu-, Ag-, and Bi-dosed Pt(111). Theoretical models based upon Monte-Carlo simulations will be summarized which, when compared to such data, allow more accurate determination of ensemble sizes. These models predict uptake curves that deviate strongly from the commonly used (1-theta)/sup A/ law (A = number of sites in ensemble), which is valid only for an array of isolated ensembles. 32 refs., 3 figs.

Campbell, C.T.; Paffett, M.T.; Voter, A.F.

1985-01-01T23:59:59.000Z

9

Test blanket modules in ITER: An overview on proposed designs and required DEMO-relevant materials  

E-Print Network (OSTI)

Test blanket modules in ITER: An overview on proposed designs and required DEMO-relevant materials, Russian Federation Abstract Within the framework of the ITER Test Blanket Working Group, the ITER Parties have made several proposals for test blanket modules to be tested in ITER from the first day of H

Abdou, Mohamed

10

What are the requirements for duct leakage testing? | Building Energy Codes  

NLE Websites -- All DOE Office Websites (Extended Search)

requirements for duct leakage testing? requirements for duct leakage testing? Both the 2009 and 2012 IECC require duct tightness to be verified. Verification can take place via either a post-construction test or a rough-in test. For the post-construction test, leakage measurement must be made across the entire system, including the manufacturer's air handler enclosure, with all register boots taped or sealed at a test pressure of 0.1 inches w.g. (25 Pa). The 2009 IECC limits the leakage to outdoors to less than or equal to 8 cfm per 100 ft2 of conditioned floor area or total leakage less than or equal to 12 cfm per 100 ft2 of conditioned floor area. The 2012 IECC only contains a requirement for total leakage of less than or equal to 4 cfm per 100 ft2 of conditioned floor area. For the rough-in test, leakage measurement is made across the system, with

11

Test requirements  

lower than theory. Water: 15 to 70% less than theoretical ... SRNL is managed and operated for the U.S. Department of Energy by Savannah River Nuclear Solutions, LLC.

12

Overview of Component Testing Requirements for a Small Fluoride Salt-Cooled High Tempreature Reactor  

Science Conference Proceedings (OSTI)

This article summarizes the information necessary to provide reasonable assurance that components for a small fluoride salt-cooled high temperature reactor will meet their functional requirements. In support of the analysis of testing requirements, a simplified, conceptual description of the systems, structures, and components specific to this reactor class was developed. These reactor system elements were divided into major categories based on their functions: (1) reactor core systems, (2) heat transport system, (3) reactor auxiliary cooling system, and (4) instrumentation and controls system. An assessment of technical maturity for each element was made, and a gap analysis was performed to identify specific areas that require further testing. A prioritized list of the testing requirements was then developed. The prioritization was based on both the relative importance of the system to reactor viability, and performance and time requirements to perform the testing.

Cetiner, Mustafa Sacit [ORNL; Holcomb, David Eugene [ORNL; Flanagan, George F [ORNL; Peretz, Fred J [ORNL; Yoder Jr, Graydon L [ORNL

2010-01-01T23:59:59.000Z

13

Deriving In-Use PHEV Fuel Economy Predictions from Standardized Test Cycle Results: Preprint  

DOE Green Energy (OSTI)

Explores the issue of how to apply an adjustment method to raw plug-in hybrid vehicle dynamometer test results to better estimate PHEVs' in-use fuel and electricity consumption.

Gonder, J.; Brooker, A.; Carlson, R.; Smart, J.

2009-08-01T23:59:59.000Z

14

Interoperability requirements for a South African joint command and control test facility  

Science Conference Proceedings (OSTI)

The South African National Defence Force is in the process of establishing a Joint Command and Control Test Facility at a National Research Institute. The goal with this facility is to provide an integrated environment for Joint Command and Control doctrine ... Keywords: architectures, interoperability requirements, joint command & control, service-orientated architectures, test facility

Willem H. le Roux

2008-06-01T23:59:59.000Z

15

An Analysis of Testing Requirements for Fluoride Salt Cooled High Temperature Reactor Components  

SciTech Connect

This report provides guidance on the component testing necessary during the next phase of fluoride salt-cooled high temperature reactor (FHR) development. In particular, the report identifies and describes the reactor component performance and reliability requirements, provides an overview of what information is necessary to provide assurance that components will adequately achieve the requirements, and then provides guidance on how the required performance information can efficiently be obtained. The report includes a system description of a representative test scale FHR reactor. The reactor parameters presented in this report should only be considered as placeholder values until an FHR test scale reactor design is completed. The report focus is bounded at the interface between and the reactor primary coolant salt and the fuel and the gas supply and return to the Brayton cycle power conversion system. The analysis is limited to component level testing and does not address system level testing issues. Further, the report is oriented as a bottom-up testing requirements analysis as opposed to a having a top-down facility description focus.

Holcomb, David Eugene [ORNL; Cetiner, Mustafa Sacit [ORNL; Flanagan, George F [ORNL; Peretz, Fred J [ORNL; Yoder Jr, Graydon L [ORNL

2009-11-01T23:59:59.000Z

16

Lead Coolant Test Facility Technical and Functional Requirements, Conceptual Design, Cost and Construction Schedule  

Science Conference Proceedings (OSTI)

This report presents preliminary technical and functional requirements (T&FR), thermal hydraulic design and cost estimate for a lead coolant test facility. The purpose of this small scale facility is to simulate lead coolant fast reactor (LFR) coolant flow in an open lattice geometry core using seven electrical rods and liquid lead or lead-bismuth eutectic. Based on review of current world lead or lead-bismuth test facilities and research need listed in the Generation IV Roadmap, five broad areas of requirements of basis are identified: Develop and Demonstrate Prototype Lead/Lead-Bismuth Liquid Metal Flow Loop Develop and Demonstrate Feasibility of Submerged Heat Exchanger Develop and Demonstrate Open-lattice Flow in Electrically Heated Core Develop and Demonstrate Chemistry Control Demonstrate Safe Operation and Provision for Future Testing. These five broad areas are divided into twenty-one (21) specific requirements ranging from coolant temperature to design lifetime. An overview of project engineering requirements, design requirements, QA and environmental requirements are also presented. The purpose of this T&FRs is to focus the lead fast reactor community domestically on the requirements for the next unique state of the art test facility. The facility thermal hydraulic design is based on the maximum simulated core power using seven electrical heater rods of 420 kW; average linear heat generation rate of 300 W/cm. The core inlet temperature for liquid lead or Pb/Bi eutectic is 420oC. The design includes approximately seventy-five data measurements such as pressure, temperature, and flow rates. The preliminary estimated cost of construction of the facility is $3.7M. It is also estimated that the facility will require two years to be constructed and ready for operation.

Soli T. Khericha

2006-09-01T23:59:59.000Z

17

Using acceptance tests as a support for clarifying requirements: A series of experiments  

Science Conference Proceedings (OSTI)

One of the main reasons for the failure of many software projects is the late discovery of a mismatch between the customers' expectations and the pieces of functionality implemented in the delivered system. At the root of such a mismatch is often a set ... Keywords: Acceptance testing, Empirical studies, Fit tables, Requirements

Filippo Ricca; Marco Torchiano; Massimiliano Di Penta; Mariano Ceccato; Paolo Tonella

2009-02-01T23:59:59.000Z

18

Test Requirements and Conceptual Design for a Potassium Test Loop to Support an Advanced Potassium Rankine Cycle Power Conversion Systems  

SciTech Connect

Parameters for continuing the design and specification of an experimental potassium test loop are identified in this report. Design and construction of a potassium test loop is part of the Phase II effort of the project ''Technology Development Program for an Advanced Potassium Rankine Power Conversion System''. This program is supported by the National Aeronautics and Space Administration. Design features for the potassium test loop and its instrumentation system, specific test articles, and engineered barriers for ensuring worker safety and protection of the environment are described along with safety and environmental protection requirements to be used during the design process. Information presented in the first portion of this report formed the basis to initiate the design phase of the program; however, the report is a living document that can be changed as necessary during the design process, reflecting modifications as additional design details are developed. Some portions of the report have parameters identified as ''to be determined'' (TBD), reflecting the early stage of the overall process. In cases where specific design values are presently unknown, the report attempts to document the quantities that remain to be defined in order to complete the design of the potassium test loop and supporting equipment.

Yoder, JR.G.L.

2006-03-08T23:59:59.000Z

19

Deriving In-Use PHEV Fuel Economy Predictions from Standardized Test Cycle Results  

DOE Green Energy (OSTI)

Plug-in hybrid electric vehicles (PHEVs) have potential to reduce or eliminate the U.S. dependence on foreign oil. Quantifying the amount of petroleum each uses, however, is challenging. To estimate in-use fuel economy for conventional vehicles the Environmental Protection Agency (EPA) conducts chassis dynamometer tests on standard historic drive cycles and then adjusts the resulting “raw” fuel economy measurements downward. Various publications, such as the forthcoming update to the SAE J1711 recommended practice for PHEV fuel economy testing, address the challenges of applying standard test procedures to PHEVs. This paper explores the issue of how to apply an adjustment method to such “raw” PHEV dynamometer test results in order to more closely estimate the in-use fuel and electricity consumption characteristics of these vehicles. The paper discusses two possible adjustment methods, and evaluates one method by applying it to dynamometer data and comparing the result to in-use fleet data (on an aftermarket conversion PHEV). The paper will also present the methodologies used to collect the data needed for this comparison.

John Smart; Richard "Barney" Carlson; Jeff Gonder; Aaron Brooker

2009-09-01T23:59:59.000Z

20

Technical requirements for the actinide source-term waste test program  

SciTech Connect

This document defines the technical requirements for a test program designed to measure time-dependent concentrations of actinide elements from contact-handled transuranic (CH TRU) waste immersed in brines similar to those found in the underground workings of the Waste Isolation Pilot Plant (WIPP). This test program wig determine the influences of TRU waste constituents on the concentrations of dissolved and suspended actinides relevant to the performance of the WIPP. These influences (which include pH, Eh, complexing agents, sorbent phases, and colloidal particles) can affect solubilities and colloidal mobilization of actinides. The test concept involves fully inundating several TRU waste types with simulated WIPP brines in sealed containers and monitoring the concentrations of actinide species in the leachate as a function of time. The results from this program will be used to test numeric models of actinide concentrations derived from laboratory studies. The model is required for WIPP performance assessment with respect to the Environmental Protection Agency`s 40 CFR Part 191B.

Phillips, M.L.F.; Molecke, M.A.

1993-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Testing requirements for variable-speed generating technology for wind turbine applications. Final report  

Science Conference Proceedings (OSTI)

Guidelines for evaluating the impacts of integrating variable-speed, constant-frequency (VSCF) wind turbines into electric utility systems have been proposed based upon prior test experiences with the NASA VSCF system and the expected performance of the Westinghouse and OMNION VSCF systems. The NASA and Westinghouse VSCF generating systems use a wound rotor induction generator and a cycloconverter, while the OMNION system uses a wound rotor induction generator and a dc-current link converter. The design of VSCF/utility system interface requirements and test plans is based on utility system electrical issues such as utility system control and operation, protection, voltage/reactive power management, power quality, and reliability. A framework for testing VSCF concepts is proposed which includes a three stage process: modeling of the system to analyze design alternatives and simulate disturbances that could be harmful to the actual system; laboratory testing which involves the use of the system under controlled conditions; and field testing to collect data under actual conditions to validate models and analyze the wind turbine behavior.

Herrera, J.I.

1986-05-01T23:59:59.000Z

22

Meeting Human Reliability Requirements through Human Factors Design, Testing, and Modeling  

SciTech Connect

In the design of novel systems, it is important for the human factors engineer to work in parallel with the human reliability analyst to arrive at the safest achievable design that meets design team safety goals and certification or regulatory requirements. This paper introduces the System Development Safety Triptych, a checklist of considerations for the interplay of human factors and human reliability through design, testing, and modeling in product development. This paper also explores three phases of safe system development, corresponding to the conception, design, and implementation of a system.

R. L. Boring

2007-06-01T23:59:59.000Z

23

Necessity and Requirements of a Collaborative Effort to Develop a Large Wind Turbine Blade Test Facility in North America  

DOE Green Energy (OSTI)

The wind power industry in North America has an immediate need for larger blade test facilities to ensure the survival of the industry. Blade testing is necessary to meet certification and investor requirements and is critical to achieving the reliability and blade life needed for the wind turbine industry to succeed. The U.S. Department of Energy's (DOE's) Wind Program is exploring options for collaborating with government, private, or academic entities in a partnership to build larger blade test facilities in North America capable of testing blades up to at least 70 m in length. The National Renewable Energy Laboratory (NREL) prepared this report for DOE to describe the immediate need to pursue larger blade test facilities in North America, categorize the numerous prospective partners for a North American collaboration, and document the requirements for a North American test facility.

Cotrell, J.; Musial, W.; Hughes, S.

2006-05-01T23:59:59.000Z

24

Correlating Dynamometer Testing to In-Use Fleet Results of Plug-In Hybrid Electric Vehicles  

DOE Green Energy (OSTI)

Standard dynamometer test procedures are currently being developed to determine fuel and electrical energy consumption of plug-in hybrid vehicles (PHEV). To define a repeatable test procedure, assumptions were made about how PHEVs will be driven and charged. This study evaluates these assumptions by comparing results of PHEV dynamometer testing following proposed procedures to actual performance of PHEVs operating in the US Department of Energy’s (DOE) North American PHEV Demonstration fleet. Results show PHEVs in the fleet exhibit a wide range of energy consumption, which is not demonstrated in dynamometer testing. Sources of variation in performance are identified and examined.

John G. Smart; Sera White; Michael Duoba

2009-05-01T23:59:59.000Z

25

Short Sample Testing Facility for the Superconducting Super Collider: Requirements and Development Status  

E-Print Network (OSTI)

to be tested are inserted in the brass channel, separated by4ea) Instrumentation Boards (3 ea) Brass Channel Helium

Zbasnik, J.

2011-01-01T23:59:59.000Z

26

A New Bench Scale Test for Determining Energy Requirement of an ...  

Science Conference Proceedings (OSTI)

Symposium, Water and Energy in Mineral Processing ... For most green and brown field operations, the amount of feed required is quite prohibitive and often  ...

27

Tank Waste Remediation System tank waste pretreatment and vitrification process development testing requirements assessment  

Science Conference Proceedings (OSTI)

A multi-faceted study was initiated in November 1993 to provide assurance that needed testing capabilities, facilities, and support infrastructure (sampling systems, casks, transportation systems, permits, etc.) would be available when needed for process and equipment development to support pretreatment and vitrification facility design and construction schedules. This first major report provides a snapshot of the known testing needs for pretreatment, low-level waste (LLW) and high-level waste (HLW) vitrification, and documents the results of a series of preliminary studies and workshops to define the issues needing resolution by cold or hot testing. Identified in this report are more than 140 Hanford Site tank waste pretreatment and LLW/HLW vitrification technology issues that can only be resolved by testing. The report also broadly characterizes the level of testing needed to resolve each issue. A second report will provide a strategy(ies) for ensuring timely test capability. Later reports will assess the capabilities of existing facilities to support needed testing and will recommend siting of the tests together with needed facility and infrastructure upgrades or additions.

Howden, G.F.

1994-10-24T23:59:59.000Z

28

Reaching corporate sustainability goals requires new thinking, testing options, and a diverse skill set.  

E-Print Network (OSTI)

requires a system of sensors and software that gathers and analyzes data while balancing loads in real time. · Online display of remote microgrid data for analysis, management, and education;5 Economic & Environmental Analysis of Converting Waste Grease to Energy Shyyon Kishani & Kevin Dang JACK

29

Steam Reforming, 6-in. Bench-Scale Design and Testing Project -- Technical and Functional Requirements Description  

SciTech Connect

Feasibility studies and technology development work are currently being performed on several processes to treat radioactive liquids and solids currently stored at the Idaho Nuclear Technology and Engineering Center (INTEC), located within the Idaho National Engineering and Environmental Laboratory (INEEL). These studies and development work will be used to select a treatment process for treatment of the radioactive liquids and solids to meet treatment milestones of the Settlement Agreement between the Department of Energy and the State of Idaho. One process under consideration for treating the radioactive liquids and solids, specifically Sodium-Bearing Waste (SBW) and tank heel solids, is fluid bed steam reforming (FBSR). To support both feasibility and development studies a bench-scale FBSR is being designed and constructed. This report presents the technical and functional requirements, experimental objectives, process flow sheets, and equipment specifications for the bench-scale FBSR.

Losinski, Sylvester John; Marshall, Douglas William

2002-08-01T23:59:59.000Z

30
31

Requirements for Defining Utility Drive Cycles: An Exploratory Analysis of Grid Frequency Regulation Data for Establishing Battery Performance Testing Standards  

DOE Green Energy (OSTI)

Battery testing procedures are important for understanding battery performance, including degradation over the life of the battery. Standards are important to provide clear rules and uniformity to an industry. The work described in this report addresses the need for standard battery testing procedures that reflect real-world applications of energy storage systems to provide regulation services to grid operators. This work was motivated by the need to develop Vehicle-to-Grid (V2G) testing procedures, or V2G drive cycles. Likewise, the stationary energy storage community is equally interested in standardized testing protocols that reflect real-world grid applications for providing regulation services. As the first of several steps toward standardizing battery testing cycles, this work focused on a statistical analysis of frequency regulation signals from the Pennsylvania-New Jersey-Maryland Interconnect with the goal to identify patterns in the regulation signal that would be representative of the entire signal as a typical regulation data set. Results from an extensive time-series analysis are discussed, and the results are explained from both the statistical and the battery-testing perspectives. The results then are interpreted in the context of defining a small set of V2G drive cycles for standardization, offering some recommendations for the next steps toward standardizing testing protocols.

Hafen, Ryan P.; Vishwanathan, Vilanyur V.; Subbarao, Krishnappa; Kintner-Meyer, Michael CW

2011-10-19T23:59:59.000Z

32

TEST  

Science Conference Proceedings (OSTI)

This is an abstract. TEST Lorem ipsum dolor sit amet, consectetur adipiscing elit. Cras lacinia dui et est venenatis lacinia. Vestibulum lacus dolor, adipiscing id mattis sit amet, ultricies sed purus. Nulla consectetur aliquet feugiat. Maecenas ips

33

Regulatory fire test requirements for plutonium air transport packages : JP-4 or JP-5 vs. JP-8 aviation fuel.  

Science Conference Proceedings (OSTI)

For certification, packages used for the transportation of plutonium by air must survive the hypothetical thermal environment specified in 10CFR71.74(a)(5). This regulation specifies that 'the package must be exposed to luminous flames from a pool fire of JP-4 or JP-5 aviation fuel for a period of at least 60 minutes.' This regulation was developed when jet propellant (JP) 4 and 5 were the standard jet fuels. However, JP-4 and JP-5 currently are of limited availability in the United States of America. JP-4 is very hard to obtain as it is not used much anymore. JP-5 may be easier to get than JP-4, but only through a military supplier. The purpose of this paper is to illustrate that readily-available JP-8 fuel is a possible substitute for the aforementioned certification test. Comparisons between the properties of the three fuels are given. Results from computer simulations that compared large JP-4 to JP-8 pool fires using Sandia's VULCAN fire model are shown and discussed. Additionally, the Container Analysis Fire (CAFE) code was used to compare the thermal response of a large calorimeter exposed to engulfing fires fueled by these three jet propellants. The paper then recommends JP-8 as an alternate fuel that complies with the thermal environment implied in 10CFR71.74.

Figueroa, Victor G.; Lopez, Carlos; Nicolette, Vernon F.

2010-10-01T23:59:59.000Z

34

Idaho National Laboratory Lead or Lead-Bismuth Eutectic (LBE) Test Facility - R&D Requirements, Design Criteria, Design Concept, and Concept Guidance  

SciTech Connect

The Idaho National Laboratory Lead-Bismuth Eutectic Test Facility will advance the state of nuclear technology relative to heavy-metal coolants (primarily Pb and Pb-Bi), thereby allowing the U.S. to maintain the pre-eminent position in overseas markets and a future domestic market. The end results will be a better qualitative understanding and quantitative measure of the thermal physics and chemistry conditions in the molten metal systems for varied flow conditions (single and multiphase), flow regime transitions, heat input methods, pumping requirements for varied conditions and geometries, and corrosion performance. Furthering INL knowledge in these areas is crucial to sustaining a competitive global position. This fundamental heavy-metal research supports the National Energy Policy Development Group’s stated need for energy systems to support electrical generation.1 The project will also assist the Department of Energy in achieving goals outlined in the Nuclear Energy Research Advisory Committee Long Term Nuclear Technology Research and Development Plan,2 the Generation IV Roadmap for Lead Fast Reactor development, and Advanced Fuel Cycle Initiative research and development. This multi-unit Lead-Bismuth Eutectic Test Facility with its flexible and reconfigurable apparatus will maintain and extend the U.S. nuclear knowledge base, while educating young scientists and engineers. The uniqueness of the Lead-Bismuth Eutectic Test Facility is its integrated Pool Unit and Storage Unit. This combination will support large-scale investigation of structural and fuel cladding material compatibility issues with heavy-metal coolants, oxygen chemistry control, and thermal hydraulic physics properties. Its ability to reconfigure flow conditions and piping configurations to more accurately approximate prototypical reactor designs will provide a key resource for Lead Fast Reactor research and development. The other principal elements of the Lead-Bismuth Eutectic Test Facility (in addition to the Pool Unit and Storage Unit) are the Bench Scale Unit and Supporting Systems, principal of which are the O2 Sensor/Calibration System, Feed System, Transfer System, Off- Gas System, Purge and Evacuation System, Oxygen Sensor and Control System, Data Acquisition and Control System, and the Safety Systems. Parallel and/or independent corrosion studies and convective heat transfer experiments for cylindrical and annular geometries will support investigation of heat transfer phenomena into the secondary side. In addition, molten metal pumping concepts and power requirements will be measured for future design use.

Eric P. Loewen; Paul Demkowicz

2005-05-01T23:59:59.000Z

35

Materials Reliability Program: Technical Basis for Change to American Society of Mechanical Engineers (ASME) Section XI Appendix VIII Root- Mean-Square Error Requirement for Qualification of Depth-Sizing for Ultrasonic Testing (UT) Performed from the In  

Science Conference Proceedings (OSTI)

This report provides the technical basis for a modification of the ultrasonic testing (UT) qualification requirements of Appendix VIII of ASME Section XI. A recommended change to the requirement for flaw depth-sizing uncertainty is presented on the basis of deterministic and probabilistic evaluation approaches.BackgroundCompliance with the 0.125" depth-sizing root-mean-square error (RMSE) required by ASME Code Section XI Appendix VIII (Supplements 2, 10, ...

2013-10-17T23:59:59.000Z

36

Mining Test Cases To Improve Software Maintenance  

E-Print Network (OSTI)

Requirements Testing Progress: How Well Does the Test Suitefocused on? Does it adequately test all requirements? Howa loop. • Does a test exercise a requirement exhaustively?

Ziftci, Celal

37

Admission Requirements Admission Requirements for Graduate Study  

E-Print Network (OSTI)

required reports. Such a candidate may, for a nominal fee and with the approval of his/her graduate advisor://www.utdallas.edu/admissions/graduate/degrees/ There is a $50.00 nonrefundable application fee. Applicants are advised to carefully review the program a bachelor's degree. Test Scores (GMAT, GRE) Standardized test scores must be official and reported directly

O'Toole, Alice J.

38

Science Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Science Requirements About ESnet Overview ESnet Staff Governance Our Network Case Studies ESnet Strategic Plan ESnet Organizational Chart ESnet History Science Requirements Network...

39

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 6.1 (July 2011) Chapter 6.1 (July 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must be certified and approved at certain levels that vary according to the dollar value of the

40

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

----------------------------------------------- ---------------------------------------- Chapter 6.1 (February 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Risk Based Requirements for Long Term Stewardship: A Proof-of-Principle Analysis of an Analytic Method Tested on Selected Hanford Locations  

Science Conference Proceedings (OSTI)

Since 1989, the Department of Energy's (DOE) Environmental Management (EM) Program has managed the environmental legacy of US nuclear weapons production research and testing at 137 facilities in 31 states and one US territory. The EM program has conducted several studies on the public risks posed by contaminated sites at these facilities. In Risks and the Risk Debate DOE, 1995a, the Department analyzed the risks at sites before, during, and after remediation work by the EM program. The results indicated that aside from a few urgent risks, most hazards present little inherent risk because physical and active site management controls limit both the releases of site contaminants, and public access to these hazards. Without these controls, these sites would pose greater risks to the public. Past risk reports, however, provided little irdiormation about post- cleanup risk, primarily because of uncertainty about fiture site uses and site characteristics at the end of planned cleanup activities. This is of concern because in many cases current cleanup technologies, and remedies, will last a shorter period of time than the waste itself and the resulting contamination will remain hazardous.

GM Gelston; JW Buck; LR Huesties; MS Peffers; TB Miley; TT Jarvis; WB Andrews

1998-12-03T23:59:59.000Z

42

Fleet servicing facilities for servicing, maintaining, and testing rail and truck radioactive waste transport systems: functional requirements, technical design concepts and options cost estimates and comparisons  

Science Conference Proceedings (OSTI)

This is a resource document which examines feasibility design concepts and feasibility studies of a Fleet Servicing Facility (FSF). Such a facility is intended to be used for routine servicing, preventive maintenance, and for performing requalification license compliance tests and inspections, minor repairs, and decontamination of both the transportation casks and their associated rail cars or tractor-trailers. None of the United States' waste handling plants presently receiving radioactive wastes have an on-site FSF, nor is there an existing third party facility providing these services. This situation has caused the General Accounting Office to express concern regarding the quality of waste transport system maintenance once the system is placed into service. Thus, a need is indicated for FSF's, or their equivalent, at various radioactive materials receiving sites. In this report, three forms of FSF's solely for spent fuel transport systems were examined: independent, integrated, and colocated. The independent concept was already the subject of a detailed report and is extensively referenced in this document so that capital cost comparisons of the three concepts could be made. These facilities probably could service high-level, intermediate-level, low-level, or other waste transportation systems with minor modification, but this study did not include any system other than spent fuel. Both the Integrated and Colocated concepts were assumed to be associated with some radioactive materials handling facility such as an AFR repository.

Watson, C.D.; Hudson, B.J.; Keith, D.A.; Preston, M.K. Jr.; McCreery, P.N.; Knox, W.; Easterling, E.M.; Lamprey, A.S.; Wiedemann, G.

1980-05-01T23:59:59.000Z

43

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 6.1 (April 2009) Chapter 6.1 (April 2009) Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in FAR Part 6. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must be certified and approved at certain levels that vary according to the dollar value of the acquisition. The information that must be included in each justification is

44

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 6.1 (April 2010) Chapter 6.1 (April 2010) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must be certified and approved at certain levels that vary according to the dollar value of the acquisition. The information that must be included in each justification is identified in FAR

45

School requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

a smooth surface and no "lip". Some presentations require AV equipment such as LCD or overhead projectors. A wireless microphone and sound system may be helpful to ensure that...

46

Required Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Required Documents Required Documents Required Documents All foreign nationals, including students and postdocs, must select the foreign nationals employment category to complete the new-hire process. Contact (505) 665-7158 Email Complete following forms before New-Hire Orientation Be sure to bring the forms with you for the orientation event, but do not sign and date: Form I-9, Employment Eligibility Verification (pdf) - original, unexpired documents for verification of employment eligibility. Please refer to the I-9 verification form titled, "Lists of Acceptable Documents", which was included with your offer letter. (Laminated documents or hospital/temporary birth certificates are not accepted.) Note: Failure to provide required documents will result in delay and/or

47

Test Purpose Generation for Timed Protocol Testing  

Science Conference Proceedings (OSTI)

Test purposes are requirements, usually constructed by hand, which aim at testing critical properties on implementations. These ones are then used by testing methods to generate test cases. Writing them manually is a heavy task, this is why we propose ... Keywords: Timed protocols, conformance testing, test purpose, testability

Sébastien Salva; Antoine Rollet

2009-07-01T23:59:59.000Z

48

Pig shipping container test sequence  

SciTech Connect

This test plan outlines testing of the integrity of the pig shipping container. It is divided into four sections: (1) drop test requirements; (2) test preparations; (3) perform drop test; and (4) post-test examination.

Adkins, H.E. Jr.

1995-01-13T23:59:59.000Z

49

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

--------------------------- Chapter 6.5 (January 2011) 1 Competition Advocate Responsibilities [Reference: FAR 6.5, FAR 7 and DEAR 906.501] Overview This section discusses the competition advocate requirements and provides a Federal Procurement Data System-New Generation (FPDS-NG) coding assistance sheet and screen shots for the FPDS-NG Competition Report. Background FAR Part 6.5, -Competition Advocates,‖ implements section 20 of the Office of Federal Procurement Policy Act, which requires the head of each executive agency to designate an Agency Competition Advocate and Procuring Activity Advocates (hereafter referred to as Activity Competition Advocates). In accordance with DEAR 906.501, the Secretary of

50

Overview of Conformance Testing  

Science Conference Proceedings (OSTI)

... require not just one test per error but one test per possible permutation of errors. ... to maximize automation and minimize human intervention. ...

2010-10-05T23:59:59.000Z

51

NVLAP Biometrics Testing LAP  

Science Conference Proceedings (OSTI)

... reserves the right to update, modify or rename the set of test methods associated with any scope of accreditation. Proficiency Testing Requirements. ...

2013-07-26T23:59:59.000Z

52

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Chapter 5.2 (April 2008) - Chapter 5.2 (April 2008) Synopsizing Proposed Non-Competitive Contract Actions Citing the Authority of FAR 6.302-1 [Reference: FAR 5 and DEAR 905] Overview This section discusses publicizing sole source actions as part of the approval of a Justification for Other than Full and Open Competition (JOFOC) using the authority of FAR 6.302-1. Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in FAR Part 6. One exception permits contracting without full and open competition when the required supplies or services are available from only one responsible source (FAR 6.302-1). This exception is

53

Accreditation Requirements for Construction Materials Testing  

Science Conference Proceedings (OSTI)

... D4435 Preparing Rock Core Specimens and Determining Tolerances D4543 Slake Durability of Shales and Weak Rocks D4644 ...

2010-04-28T23:59:59.000Z

54

Test Automation Test Automation  

E-Print Network (OSTI)

Test Automation Test Automation Mohammad Mousavi Eindhoven University of Technology, The Netherlands Software Testing 2013 Mousavi: Test Automation #12;Test Automation Outline Test Automation Mousavi: Test Automation #12;Test Automation Why? Challenges of Manual Testing Test-case design: Choosing inputs

Mousavi, Mohammad

55

ASCR Science Network Requirements  

Science Conference Proceedings (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In April 2009 ESnet and the Office of Advanced Scientific Computing Research (ASCR), of the DOE Office of Science, organized a workshop to characterize the networking requirements of the programs funded by ASCR. The ASCR facilities anticipate significant increases in wide area bandwidth utilization, driven largely by the increased capabilities of computational resources and the wide scope of collaboration that is a hallmark of modern science. Many scientists move data sets between facilities for analysis, and in some cases (for example the Earth System Grid and the Open Science Grid), data distribution is an essential component of the use of ASCR facilities by scientists. Due to the projected growth in wide area data transfer needs, the ASCR supercomputer centers all expect to deploy and use 100 Gigabit per second networking technology for wide area connectivity as soon as that deployment is financially feasible. In addition to the network connectivity that ESnet provides, the ESnet Collaboration Services (ECS) are critical to several science communities. ESnet identity and trust services, such as the DOEGrids certificate authority, are widely used both by the supercomputer centers and by collaborations such as Open Science Grid (OSG) and the Earth System Grid (ESG). Ease of use is a key determinant of the scientific utility of network-based services. Therefore, a key enabling aspect for scientists beneficial use of high performance networks is a consistent, widely deployed, well-maintained toolset that is optimized for wide area, high-speed data transfer (e.g. GridFTP) that allows scientists to easily utilize the services and capabilities that the network provides. Network test and measurement is an important part of ensuring that these tools and network services are functioning correctly. One example of a tool in this area is the recently developed perfSONAR, which has already shown its usefulness in fault diagnosis during the recent deployment of high-performance data movers at NERSC and ORNL. On the other hand, it is clear that there is significant work to be done in the area of authentication and access control - there are currently compatibility problems and differing requirements between the authentication systems in use at different facilities, and the policies and mechanisms in use at different facilities are sometimes in conflict. Finally, long-term software maintenance was of concern for many attendees. Scientists rely heavily on a large deployed base of software that does not have secure programmatic funding. Software packages for which this is true include data transfer tools such as GridFTP as well as identity management and other software infrastructure that forms a critical part of the Open Science Grid and the Earth System Grid.

Dart, Eli; Tierney, Brian

2009-08-24T23:59:59.000Z

56

Acceptance Test Refactoring  

E-Print Network (OSTI)

Abstract. In Executable Acceptance Test Driven Development, acceptance tests represent the requirements of a software system. As requirements change over time, the acceptance tests have to be updated and maintained. This process can be time-consuming and risky as acceptance tests lack the regression safety net that production code has. Refactoring of acceptance tests is used to keep the fixtures and the acceptance test definitions consistent.

Heiko Ordelt; Frank Maurer

2008-01-01T23:59:59.000Z

57

In-service Inspection Ultrasonic Testing of Reactor Pressure Vessel Welds for Assessing Flaw Density and Size Distribution per 10 CFR 50.61a, Alternate Fracture Toughness Requirements  

SciTech Connect

Pressurized thermal shock (PTS) events are system transients in a pressurized water reactor (PWR) in which there is a rapid operating temperature cool-down that results in cold vessel temperatures with or without repressurization of the vessel. The rapid cooling of the inside surface of the reactor pressure vessel (RPV) causes thermal stresses that can combine with stresses caused by high pressure. The aggregate effect of these stresses is an increase in the potential for fracture if a pre-existing flaw is present in a material susceptible to brittle failure. The ferritic, low alloy steel of the reactor vessel beltline adjacent to the core, where neutron radiation gradually embrittles the material over the lifetime of the plant, can be susceptible to brittle fracture. The PTS rule, described in the Code of Federal Regulations, Title 10, Section 50.61 (§50.61), “Fracture Toughness Requirements for Protection against Pressurized Thermal Shock Events,” adopted on July 23, 1985, establishes screening criteria to ensure that the potential for a reactor vessel to fail due to a PTS event is deemed to be acceptably low. The U.S. Nuclear Regulatory Commission (NRC) completed a research program that concluded that the risk of through-wall cracking due to a PTS event is much lower than previously estimated. The NRC subsequently developed a rule, §50.61a, published on January 4, 2010, entitled “Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events” (75 FR 13). Use of the new rule by licensees is optional. The §50.61a rule differs from §50.61 in that it requires licensees who choose to follow this alternate method to analyze the results from periodic volumetric examinations required by the ASME Code, Section XI, Rules for Inservice Inspection (ISI) of Nuclear Power Plants. These analyses are intended to determine if the actual flaw density and size distribution in the licensee’s reactor vessel beltline welds are bounded by the flaw density and size distribution values used in the PTS technical basis. Under a contract with the NRC, Pacific Northwest National Laboratory (PNNL) has been working on a program to assess the ability of current inservice inspection (ISI)-ultrasonic testing (UT) techniques, as qualified through ASME Code, Appendix VIII, Supplements 4 and 6, to detect small fabrication or inservice-induced flaws located in RPV welds and adjacent base materials. As part of this effort, the investigators have pursued an evaluation, based on the available information, of the capability of UT to provide flaw density/distribution inputs for making RPV weld assessments in accordance with §50.61a. This paper presents the results of an evaluation of data from the 1993 Browns Ferry Nuclear Plant, Unit 3, Spirit of Appendix VIII reactor vessel examination, a comparison of the flaw density/distribution from this data with the distribution in §50.61a, possible reasons for differences, and plans and recommendations for further work in this area.

Sullivan, Edmund J.; Anderson, Michael T.; Norris, Wallace

2012-09-17T23:59:59.000Z

58

Healthcare Information Technology Testing  

Science Conference Proceedings (OSTI)

... products. NIST Handbook 150 and NIST Handbook 150-31 provide the general and the specific requirements for all HIT testing. ...

2013-09-13T23:59:59.000Z

59

Voting System Testing  

Science Conference Proceedings (OSTI)

... required to be accredited to all core test methods involving: 1) technical data package review; 2) physical configuration audit (including examination ...

2013-09-06T23:59:59.000Z

60

Heat pipe testing program test plan  

SciTech Connect

A test plan is given which describes the tests to be conducted on several typical solar receiver heat pipes. The hardware to be used, test fixtures and rationale of the test program are discussed. The program objective is to perform life testing under simulated receiver conditions, and to conduct performance tests with selected heat pipes to further map their performance, particularly with regard to their transient behavior. Performance requirements are defined. Test fixtures designed for the program are described in detail, and their capabilities for simulating the receiver conditions and their limitations are discussed. The heat pipe design is given. (LEW)

Bienert, W.B.

1980-03-14T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Advanced empirical testing  

Science Conference Proceedings (OSTI)

In today's industrial applications, we see that knowledge systems are successfully implemented. However, critical domains require the elaborate and thoughtful validation of the knowledge bases before the deployment. Empirical testing, also known as regression ... Keywords: Evaluation, Knowledge quality, Quality measures, Regression testing, Test cases, Test visualization, Validation, Verification

Joachim Baumeister

2011-02-01T23:59:59.000Z

62

LBNL Window & Daylighting Software -- RESFEN: System Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

SYSTEM REQUIREMENTS OPERATING SYSTEM Program has been tested on Microsoft Windows 7, Windows XP, Windows 2000TM.. Older version of Microsoft Windows might work, but are not...

63

LBNL Windows & Daylighting Software -- THERM: System Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

SYSTEM REQUIREMENTS OPERATING SYSTEM Program has been tested on Microsoft Windows XP, Windows 2000TM.. Older version of Microsoft Windows might work, but are not supported. (The...

64

LBNL Windows & Daylighting Software -- WINDOW: System Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

REQUIREMENTS OPERATING SYSTEM Program has been tested on Microsoft Vista, Microsoft Windows 7, Microsoft Windows XP, Windows 2000TM.. It has been reported by users that the...

65

Repository seals requirement study  

Science Conference Proceedings (OSTI)

The Yucca Mountain Site Characterization Project, managed by the Civilian Radioactive Waste Management System (CRWMS) Management and Operating Contractor (M and O) is conducting investigations to support the Viability Assessment and the License Application for a high-level nuclear waste repository at Yucca Mountain, Nevada. The sealing subsystem is part of the Yucca Mountain Waste Isolation System. The Yucca Mountain Site Characterization Project is currently evaluating the role of the sealing subsystem (shaft, ramp and exploratory borehole seals) in achieving the overall performance objectives for the Waste Isolation System. This report documents the results of those evaluations. The objective of the study is to provide water or air flow performance based requirements for shafts, ramps, and exploratory boreholes located near the repository. Recommendations, as appropriate, are provided for developing plans, seals component testing, and other studies relating to sealing.

NONE

1997-11-03T23:59:59.000Z

66

Mutation testing strategies using mutant classification  

Science Conference Proceedings (OSTI)

Mutation testing has a widespread reputation of being a rather powerful testing technique. However, its practical application requires the detection of equivalent mutants. Detecting equivalent mutants is cumbersome since it requires manual analysis, ... Keywords: mutant classification, mutants' impact, mutation testing

Mike Papadakis; Yves Le Traon

2013-03-01T23:59:59.000Z

67

Quantifying requirements volatility effects  

Science Conference Proceedings (OSTI)

In an organization operating in the bancassurance sector we identified a low-risk IT subportfolio of 84 IT projects comprising together 16,500 function points, each project varying in size and duration, for which we were able to quantify its requirements ... Keywords: ?-ratio, ?-ratio, Compound monthly growth rate, IT dashboard, IT portfolio management, Quantitative IT portfolio management, Requirements churn, Requirements creep, Requirements metric, Requirements scrap, Requirements volatility, Requirements volatility dashboard, Scope creep, Volatility benchmark, Volatility tolerance factor

G. P. Kulk; C. Verhoef

2008-08-01T23:59:59.000Z

68

Repository seals requirements study  

SciTech Connect

The Yucca Mountain Site Characterization Project, managed by the Civilian Radioactive Waste Management System (CRWMS) Management and Operating Contractor (M and O) is conducting investigations to support the Viability Assessment and the License Application for a high-level nuclear waste repository at Yucca Mountain, Nevada. The sealing subsystem is part of the Yucca Mountain Waste Isolation System. The Yucca Mountain Site Characterization Project is currently evaluating the role of the sealing subsystem (shaft, ramp and exploratory borehole seals) in achieving the overall performance objectives for the Waste Isolation System. This report documents the results of those evaluations. This report presents the results of a repository sealing requirements study. Sealing is defined as the permanent closure of the shafts, ramps, and exploratory boreholes. Sealing includes those components that would reduce potential inflows above the repository, or that would divert flow near the repository horizon to allow vertical infiltration to below the repository. Sealing of such features as emplacement drifts was not done in this study because the current capability to calculate fracture flow into the drifts is not sufficiently mature. The objective of the study is to provide water or air flow performance based requirements for shafts, ramps, and exploratory boreholes located near the repository. Recommendations, as appropriate, are provided for developing plans, seals component testing, and other studies relating to sealing.

NONE

1997-11-03T23:59:59.000Z

69

A Test Suite Generator For Struts Based Applications.  

E-Print Network (OSTI)

??Testing web-based enterprise applications requires the use of automated testing frameworks. The testing framework's ability to run suites of test cases through development ensures enhancements… (more)

Jackson, Gregory M.

2004-01-01T23:59:59.000Z

70

TVDG Training Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Training Requirements TVDG Training Requirements information is now located at: http:www.bnl.govuserscenterTrainingtandem.asp. You will automatically be taken to the new...

71

BER Requirements Review 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

About ESnet Overview ESnet Staff Governance Our Network Case Studies ESnet Strategic Plan ESnet Organizational Chart ESnet History Science Requirements Network Requirements...

72

ASCR Requirements Review 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

About ESnet Overview ESnet Staff Governance Our Network Case Studies ESnet Strategic Plan ESnet Organizational Chart ESnet History Science Requirements Network Requirements...

73

Security Resiliency Testing  

Science Conference Proceedings (OSTI)

An accepted practice within the electric sector is to pre-stage and test equipment before deployment. Verification of functionality, operating parameters, and interoperability of equipment to be deployed can often be incorporated into predeployment testing. This testing may also support the selection of features responsible for the security of the host equipment. However, some security features and many aspects of resiliency testing may require activation, interaction, and interoperability with an ...

2013-12-02T23:59:59.000Z

74

Coaxial test fixture  

DOE Patents (OSTI)

This invention pertains to arrangements for performing electrical tests on contact material samples, and in particular for testing contact material test samples in an evacuated environment under high current loads. Frequently, it is desirable in developing high-current separable contact material, to have at least a preliminary analysis of selected candidate conductor materials. Testing of material samples will hopefully identify materials unsuitable for high current electrical contact without requiring incorporation of the materials into a completed and oftentimes complex structure.

Praeg, W.F.

1984-03-30T23:59:59.000Z

75

HAN System Security Requirements  

Science Conference Proceedings (OSTI)

This report, "Home Area Network (HAN) Security Requirements," identifies and discusses the key cyber security requirements for different interfaces of HAN-based systems. These cyber security requirements for HAN interfaces are derived from the Department of Homeland Security (DHS) "Catalog of Control Systems Security," which provides an excellent checklist of general security requirements.

2009-12-22T23:59:59.000Z

76

Evaporative Testing Requirements for Dual-Fuel Compressed Natural Gas (CNG)/Gasoline and Liquefied Petroleum Gas (LPG)/Gasoline Vehicles – Revision of MAC #99-01 To Allow Subtraction of Methane Emissions from  

E-Print Network (OSTI)

The attached MAC clarifies the Air Resources Board's procedures regarding evaporative emission testing of dual-fuel CNG/gasoline vehicles. This MAC revises and supersedes MAC #99-01 by allowing manufacturers to determine, report, and subtract methane emissions when a dual-fuel CNG/gasoline vehicle is tested for evaporative emissions. A related revision clarifies that for dual-fuel CNG/gasoline medium-duty vehicles, the applicable “LEV I ” evaporative emission standards, which are dependent on the fuel tank capacity of the medium-duty vehicles, are determined solely on the fuel tank capacity of the gasoline fuel system. If you have any questions or comments, please contact Mr. Steven Hada, Air

Alan C. Lloyd, Ph.D.; Arnold Schwarzenegger; All Heavy-duty Vehicle Manufacturers

2004-01-01T23:59:59.000Z

77

SPECTR System Operational Test Report  

Science Conference Proceedings (OSTI)

This report overviews installation of the Small Pressure Cycling Test Rig (SPECTR) and documents the system operational testing performed to demonstrate that it meets the requirements for operations. The system operational testing involved operation of the furnace system to the design conditions and demonstration of the test article gas supply system using a simulated test article. The furnace and test article systems were demonstrated to meet the design requirements for the Next Generation Nuclear Plant. Therefore, the system is deemed acceptable and is ready for actual test article testing.

W.H. Landman Jr.

2011-08-01T23:59:59.000Z

78

How Vehicles Are Tested  

NLE Websites -- All DOE Office Websites (Extended Search)

simulates cycling. The energy required to move the rollers can be adjusted to account for wind resistance and the vehicle's weight. Photo: Driver running car through test cycle on...

79

Current Test Procedure Waivers  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy's (DOE) regulations for covered products permit a person to seek a waiver, or an interim waiver, from the test procedure requirements for covered appliances and...

80

DOE Testing Reveals Samsung Refrigerator Does Not Meet Energy...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Testing Reveals Samsung Refrigerator Does Not Meet Energy Star Requirements DOE Testing Reveals Samsung Refrigerator Does Not Meet Energy Star Requirements March 16, 2010 - 4:28pm...

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Requirement-Reviews.pptx  

NLE Websites -- All DOE Office Websites (Extended Search)

Published 3 h%p:www.nersc.govsciencerequirements---reviews final---reports * Compurequirements f or 20132014 * Execurequirements * Case s...

82

Collaborative Requirements Engineering Project  

Science Conference Proceedings (OSTI)

... dependencies, safety, and environmental requirements) is essential to the ... Construction, and Operation of Constructed Facilities, March 2012. ...

2013-01-03T23:59:59.000Z

83

Allocating Reserve Requirements (Presentation)  

DOE Green Energy (OSTI)

This presentation provides an overview of present and possible future ways to allocate and assign benefits for reserve requirements.

Milligan, M.; Kirby, B.; King, J.

2011-07-01T23:59:59.000Z

84

Emergency Medical Treatment Required  

E-Print Network (OSTI)

Emergency Medical Treatment Required Non-Emergency Medical Treatment Required If possible, get help present if possible OptaComp will complete the "First Report of Injury or Illness" and authorize medical Investigation Report" to Environmental Health & Safety within 48 hours Emergency Medical Treatment Required

Weston, Ken

85

FES Science Network Requirements  

E-Print Network (OSTI)

FES Science Network Requirements Report of the Fusion Energy Sciences Network Requirements Workshop Conducted March 13 and 14, 2008 #12;FES Science Network Requirements Workshop Fusion Energy Sciences Program Office, DOE Office of Science Energy Sciences Network Gaithersburg, MD ­ March 13 and 14, 2008 ESnet

Geddes, Cameron Guy Robinson

86

PIT Coating Requirements Analysis  

SciTech Connect

This study identifies the applicable requirements for procurement and installation of a coating intended for tank farm valve and pump pit interior surfaces. These requirements are intended to be incorporated into project specification documents and design media. This study also evaluates previously recommended coatings and identifies requirement-compliant coating products.

MINTEER, D.J.

2000-10-20T23:59:59.000Z

87

NREL Battery Thermal and Life Test Facility (Presentation)  

DOE Green Energy (OSTI)

This presentation describes NREL's Battery Thermal Test Facility and identifies test requirements and equipment and planned upgrades to the facility.

Keyser, M.

2011-05-01T23:59:59.000Z

88

Solid Rocket Motor Acoustic Testing  

DOE Green Energy (OSTI)

Acoustic data are often required for the determination of launch and powered flight loads for rocket systems and payloads. Such data are usually acquired during test firings of the solid rocket motors. In the current work, these data were obtained for two tests at a remote test facility where we were visitors. This paper describes the data acquisition and the requirements for working at a remote site, interfacing with the test hosts.

Rogers, J.D.

1999-03-31T23:59:59.000Z

89

Transportation System Requirements Document  

SciTech Connect

This Transportation System Requirements Document (Trans-SRD) describes the functions to be performed by and the technical requirements for the Transportation System to transport spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from Purchaser and Producer sites to a Civilian Radioactive Waste Management System (CRWMS) site, and between CRWMS sites. The purpose of this document is to define the system-level requirements for Transportation consistent with the CRWMS Requirement Document (CRD). These requirements include design and operations requirements to the extent they impact on the development of the physical segments of Transportation. The document also presents an overall description of Transportation, its functions, its segments, and the requirements allocated to the segments and the system-level interfaces with Transportation. The interface identification and description are published in the CRWMS Interface Specification.

1993-09-01T23:59:59.000Z

90

The Virtual Cement and Concrete Testing Laboratory ...  

Science Conference Proceedings (OSTI)

... the need to satisfy performance requirements in the ... electron microscope (Analytical Chemistry Division ... Compressive testing machines (Structures ...

2002-03-01T23:59:59.000Z

91

Solar Thermal Test Facility experiment manual  

DOE Green Energy (OSTI)

Information is provided on administrative procedures, capabilities, and requirements of experimenters using the Solar Thermal Test Facility. (MHR)

Darsey, D. M.; Holmes, J. T.; Seamons, L. O.; Kuehl, D. J.; Davis, D. B.; Stomp, J. M.; Matthews, L. K.; Otts, J. V.

1977-10-01T23:59:59.000Z

92

Acceptance-test specifications for Test Number Four: process sensor and display test. [LMFBR  

SciTech Connect

This document provides the general instructions for performing acceptance Test Number Four as indicated in the Acceptance Test Index (TI-022-130-003). Also indicated are the plant conditions and special equipment required to conduct the test. The acceptance criteria for each portion of the test are specified.

Bell, C.R.

1975-05-09T23:59:59.000Z

93

Mandatory Supervisory Training Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mandatory Supervisory Training Requirements Mandatory Supervisory Training Requirements All DOE supervisors, managers, and executives will comply with mandatory supervisory training requirements (5 CFR 412; 5 CFR 315.801; 5 CFR 315.901; DOE O 360.1; and DOE O 320.1): * New supervisors: 80 hours of supervisory training, with 40 hours required to be completed during the supervisory probationary period. * Experienced supervisors: minimum of 8 hours of supervisory training each year. The Office of Learning and Workforce Development has developed an inventory of training and developmental activities that will meet the supervisory training requirements. The DOE courses Supervisory Essentials (32 hours) and Navigating the Federal Hiring Process (8 hours) are required to fulfill the first year 40-hour training

94

Public Safety Network Requirements  

Science Conference Proceedings (OSTI)

... need excellent situational awareness in order to do their jobs effectively. ... performance requirements as shown in Figure 2. This analysis was used ...

2013-03-13T23:59:59.000Z

95

Management requirements for accreditation  

Science Conference Proceedings (OSTI)

... handbook, shall be defined in the quality manual. ... It is a fundamental requirement that the results ... NIST Handbook 150 (and ISO/IEC 17025) details ...

2013-08-20T23:59:59.000Z

96

CCI: Program Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Your Arrival Your First Day Weekly Activities Program Requirements Checkout FAQ The DOE WDTS site has comprehensive information on Participant Obligations. Consult that site for...

97

New Employee Training Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

All New Employees New Supervisors New Employee Training Requirements Welcome to Berkeley Lab We value you and the talents that you bring to our workplace. The training listed...

98

Public Safety Network Requirements  

Science Conference Proceedings (OSTI)

... Usage scenario. ... imposed by public safety applications and usage scenarios is key in ... requirements as shown in Figure 2. This analysis was used as ...

2010-10-05T23:59:59.000Z

99

ASCR Science Network Requirements  

E-Print Network (OSTI)

ASCR Science Network Requirements Office of AdvancedScientific Computing Research, DOE Office of ScienceEnergy Sciences Network Gaithersburg, MD — April 15 and 16,

Dart, Eli

2010-01-01T23:59:59.000Z

100

NERVA Program. Operating procedure: cart cooling system, Test Cell A  

SciTech Connect

The instructions described in this procedure are typical of the operation of Test Cell A relative to the KIWI-B4A. Operation of Test Cell A relative to the NRX reactor will require modifications dictated by specific test requirements. Under NRX conditions, it will be the responsibility of the test cell manager to evaluate the capabilities of Test Cell A in terms of given test requirements and then set forth detailed checklists which will be compatible with the test requirements.

1963-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Integrated Management Requirements mapping  

Science Conference Proceedings (OSTI)

This document contains five appendices documenting how Sandia implemented the DOE Conduct of Operations (5480.19) and DOE Quality Assurance (5700.6C) orders. It provides a mapping of the Sandia integrated requirements to the specific requirements of each Order and a mapping to Sandia's approved program for implementing the Conduct of Operations Order.

Holmes, J.T.; Andrews, N.S.

1992-06-01T23:59:59.000Z

102

Secretary Bodman's Memorandum Regarding Drug Testing at DOE  

Energy.gov (U.S. Department of Energy (DOE))

Decisions regarding drug testing for Department of Energy positions that require access authorizations (Security Clearances)

103

Pendulum detector testing device  

DOE Patents (OSTI)

A detector testing device is described which provides consistent, cost-effective, repeatable results. The testing device is primarily constructed of PVC plastic and other non-metallic materials. Sensitivity of a walk-through detector system can be checked by: (1) providing a standard test object simulating the mass, size and material content of a weapon or other contraband, (2) suspending the test object in successive positions, such as head, waist and ankle levels, simulating where the contraband might be concealed on a person walking through the detector system; and (3) swinging the suspended object through each of the positions, while operating the detector system and observing its response. The test object is retained in a holder in which the orientation of the test device or target can be readily changed, to properly complete the testing requirements. 5 figs.

Gonsalves, J.M.

1997-09-30T23:59:59.000Z

104

Pendulum detector testing device  

DOE Patents (OSTI)

A detector testing device which provides consistent, cost-effective, repeatable results. The testing device is primarily constructed of PVC plastic and other non-metallic materials. Sensitivity of a walk-through detector system can be checked by: 1) providing a standard test object simulating the mass, size and material content of a weapon or other contraband, 2) suspending the test object in successive positions, such as head, waist and ankle levels, simulating where the contraband might be concealed on a person walking through the detector system; and 3) swinging the suspended object through each of the positions, while operating the detector system and observing its response. The test object is retained in a holder in which the orientation of the test device or target can be readily changed, to properly complete the testing requirements.

Gonsalves, John M. (Modesto, CA)

1997-01-01T23:59:59.000Z

105

Instrumentation and transformation of Java source code for automated testing with search-based testing algorithms.  

E-Print Network (OSTI)

??Search-based Software Test Data Generation is a ?eld of research treating test input generation as a search problem. Search algorithms require that an objective function… (more)

Jansen, Karsten

2010-01-01T23:59:59.000Z

106

Qualification, Certification and Training of ETA Test Personnel  

NLE Websites -- All DOE Office Websites (Extended Search)

of the personnel involved in the activity shall be held to discuss the following: 4.4.1 Test purpose and requirements 4.4.2 Test requirements 4.4.3 Personnel requirements 4.4.4...

107

Chesapeake Testing  

Science Conference Proceedings (OSTI)

... Send E-Mail to NVLAP at: NVLAP@nist.gov. Personal Body Armor Testing. ... 7 Ballistic Resistance of Body Armor, Section 7, Ballistic Test Methods. ...

2014-01-03T23:59:59.000Z

108

Structural Testing  

DOE Green Energy (OSTI)

Structural testing at the National Wind Technology Center (NWTC) offers many benefits to wind turbine companies. NWTC includes a new high bay large enough to test any blade expected during the next 5 years. (There are four test bays.) In 1995, NWTC developed a saphisticated data acquisition system, known as the Blade Structural Testing Real-time Acquisition Interface Network (BSTRAIN), to monitor structural testing through 24-hour continuous video surveillance. NWTC recommends ultimate static-strength and fatigue testing, with nondestructive testing in some cases (vibrational testing is covered in a separate information sheet).

NONE

1996-06-01T23:59:59.000Z

109

Full SPP Partnership Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Partnership Requirements: Partnership Requirements: ENERGY STAR Partnership for Commercial & Industrial Service and Product Providers (SPP) Eligible Organizations Companies providing energy efficiency services and products to commercial buildings and industrial manufacturing facilities/plants are eligible for the Service and Product Provider (SPP) partnership, but must meet certain requirements as specified below. Types of eligible companies include: architecture, distributor, energy consultant/energy management services, energy improvement contractor, energy information services, energy services company (ESCO), engineering, equipment manufacturer, financial services, on-site energy production services, unregulated energy retailer and marketer, or other supplier of standard energy-efficient products and/or services for commercial buildings and/or

110

Technical Safety Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Safety Requirements Safety Requirements FUNCTIONAL AREA GOAL: Contractor has developed, maintained, and received DOE Field Office Approval for the necessary operating conditions of a facility. The facility has also maintained an inventory of safety class and safety significant systems and components. REQUIREMENTS:  10 CFR 830.205, Nuclear Safety Rule.  DOE-STD-3009-2002, Preparation Guide for U. S. Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses.  DOE-STD-1186-2004, Specific Administrative Controls. Guidance:  DOE G 423.1-1, Implementation Guide for Use in Developing Technical Safety Requirements.  NSTP 2003-1, Use of Administrative Controls for Specific Safety Functions. Performance Objective 1: Contractor Program Documentation

111

NSLS II: Authentication Required  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Pages Login Access to this area of the NSLS-II website requires a valid username and password. Username: Password: Next > Last Modified: April 2, 2013 Please forward all...

112

BES Science Network Requirements  

E-Print Network (OSTI)

the Directors of the Office of Science, Office of AdvancedOffice of Basic Energy Sciences. This is LBNL report LBNL-BES Science Network Requirements Report of the Basic Energy

Dart, Eli

2011-01-01T23:59:59.000Z

113

***IMMEDIATE RESPONSE REQUIRED***  

Science Conference Proceedings (OSTI)

... with the costly techniques in use today. ... a network generates interference and wastes energy. ... Evolutionary Computation—The Fossil Record IEEE ...

2009-10-02T23:59:59.000Z

114

Core Requirements Test Suite for the 2005 VVSG Revision  

Science Conference Proceedings (OSTI)

... process from election definition through report generation. ... This package is distributed as an archive file ... contents of the Votetest distribution is given ...

2011-01-28T23:59:59.000Z

115

An Assessment of Fault Current Limiter Testing Requirements ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Reliability (OE) is conducting research and development (R&D) on next-generation electricity delivery equipment including fault current limiters (FCLs). Prototype FCL...

116

Building Envelope Requirements Overview Page 3-1 3 Building Envelope Requirements  

E-Print Network (OSTI)

. For the building envelope, field verification and diagnostic testing procedures exist for insulation qualityBuilding Envelope Requirements ­ Overview Page 3-1 3 Building Envelope Requirements The building. The principal components of heating loads are building envelope infiltration as well as conduction losses

117

Specific test and evaluation plan  

SciTech Connect

The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AX-B Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.

Hays, W.H.

1998-03-20T23:59:59.000Z

118

Specific test and evaluation plan  

SciTech Connect

The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-A Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a ``lower tier`` document based on the W-314 Test and Evaluation Plan (TEP) This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the modifications of the AN-A valve pit. The Project Design Specifications (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the modifications to the 241-AN-A Valve Pit. The STEP will be utilized in conjunction with the TEP for verification and validation.

Hays, W.H.

1997-12-09T23:59:59.000Z

119

Test Diversity  

E-Print Network (OSTI)

This paper describes a novel method for measuring the degree to which a set of test cases executes a given program in diverse ways with respect to the two fundamental programming concepts: control and data. Test Diversity is a method for measuring the variety of software control flow and data flow, comprising of four new measures: conditional diversity, data diversity, standard deviation of diversity, and test orthogonality. These closely-related measures could be used to evaluate the test effectiveness and the test-effort distribution of a test suite. The Diversity Analyzer is a novel industrial-strength testing tool that can currently perform diversity analysis on software written in C/C++/C#/VB in Windows and.NET environments. The Diversity Analyzer is used to evaluate the fault-detection effectiveness of Test Diversity on various types of industrial projects. Key Words: testing tools, verification, theory, experimentation, conditional diversity, data diversity, standard deviation,

Borislav Nikolik

2006-01-01T23:59:59.000Z

120

VFP: Program Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Requirements Program Requirements Home Welcome Researcher! Preparing for Your Visit Your Arrival Your First Day Weekly Activities Program Requirements Checkout FAQ The DOE WDTS site has comprehensive information on Participant Obligations. Consult that site for more information on all deliverables except the Fermilab Summer Interns website. Attendance: Complete the full ten-week program and attend all scheduled events including lectures, tours and group activities. Entrance Survey: Complete the entrance survey within your first week at Fermilab. One-page Peer Review Provide a one-page written peer review of another SULI intern' talk or poster. Abstract for General Audience Complete and submit an abstract summarizing your research experience. Oral or Poster Presentation: Deliver an oral or poster presentation to mentors and peers the final week

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

BER Science Network Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Network Network Requirements Report of the Biological and Environmental Research Network Requirements Workshop Conducted July 26 and 27, 2007 BER Science Network Requirements Workshop Biological and Environmental Research Program Office, DOE Office of Science Energy Sciences Network Bethesda, MD - July 26 and 27, 2007 ESnet is funded by the US Dept. of Energy, Office of Science, Advanced Scientific Computing Research (ASCR) program. Dan Hitchcock is the ESnet Program Manager. ESnet is operated by Lawrence Berkeley National Laboratory, which is operated by the University of California for the US Department of Energy under contract DE-AC02-05CH11231. This work was supported by the Directors of the Office of Science, Office of Advanced Scientific Computing Research, Facilities Division, and the Office of Biological &

122

SULI: Program Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Requirements Program Requirements Home Welcome Intern! Preparing for Your Internship Your Arrival Your First Day Weekly Activities Program Requirements Checkout FAQ The DOE WDTS site has comprehensive information on Participant Obligations. Consult that site for more information on all deliverables except the Fermilab Summer Interns website. Attendance: Complete the full ten-week program and attend all scheduled events including lectures, tours and group activities. Entrance Survey: First create an account by following the link, educationLink New Account Setup. After creating the account, you can login to the educationLink site. Complete the entrance survey posted on your EduLink site within your first week at Fermilab. One-page Peer Review Provide a one-page written peer review of another SULI intern' talk or

123

Federal Metering Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Metering Requirements Metering Requirements FUPWG - May 23, 2013 Brad Gustafson Federal Energy Management Program 2 42 USC 8253 - ENERGY MANAGEMENT REQUIREMENT (e) Metering By October 1, 2012, in accordance with guidelines established by the Secretary under paragraph (2), all Federal buildings shall, for the purposes of efficient use of energy and reduction in the cost of electricity used in such buildings, be metered. Each agency shall use, to the maximum extent practicable, advanced meters or advanced metering devices that provide data at least daily and that measure at least hourly consumption of electricity in the Federal buildings of the agency. Not later than October 1, 2016, each agency shall provide for equivalent metering of natural gas and steam, in accordance with guidelines established by the Secretary

124

Regulators, Requirements, Statutes  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulators, Requirements, Statutes Regulators, Requirements, Statutes Regulators, Requirements, Statutes The Laboratory must comply with environmental laws and regulations that apply to Laboratory operations. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Environmental laws and regulations LANL complies with more than 30 state and federal regulations and policies designed to protect human health and the environment. Regulators Regulators Environmental Protection Agency (EPA) EPA Homepage EPA - Region VI U.S. Department of Energy (DOE) DOE Homepage DOE Environmental Policy DOE Citizen's Advisory Board U.S. Fish and Wildlife Service (FWS) Southwest Region 2 New Mexico Environment Department (NMED) NMED Homepage NMED DOE Oversight Office

125

Gas Test Loop Booster Fuel Hydraulic Testing  

SciTech Connect

The Gas Test Loop (GTL) project is for the design of an adaptation to the Advanced Test Reactor (ATR) to create a fast-flux test space where fuels and materials for advanced reactor concepts can undergo irradiation testing. Incident to that design, it was found necessary to make use of special booster fuel to enhance the neutron flux in the reactor lobe in which the Gas Test Loop will be installed. Because the booster fuel is of a different composition and configuration from standard ATR fuel, it is necessary to qualify the booster fuel for use in the ATR. Part of that qualification is the determination that required thermal hydraulic criteria will be met under routine operation and under selected accident scenarios. The Hydraulic Testing task in the GTL project facilitates that determination by measuring flow coefficients (pressure drops) over various regions of the booster fuel over a range of primary coolant flow rates. A high-fidelity model of the NW lobe of the ATR with associated flow baffle, in-pile-tube, and below-core flow channels was designed, constructed and located in the Idaho State University Thermal Fluids Laboratory. A circulation loop was designed and constructed by the university to provide reactor-relevant water flow rates to the test system. Models of the four booster fuel elements required for GTL operation were fabricated from aluminum (no uranium or means of heating) and placed in the flow channel. One of these was instrumented with Pitot tubes to measure flow velocities in the channels between the three booster fuel plates and between the innermost and outermost plates and the side walls of the flow annulus. Flow coefficients in the range of 4 to 6.5 were determined from the measurements made for the upper and middle parts of the booster fuel elements. The flow coefficient for the lower end of the booster fuel and the sub-core flow channel was lower at 2.3.

Gas Test Loop Hydraulic Testing Staff

2006-09-01T23:59:59.000Z

126

Rough Ride Test Procedure  

NLE Websites -- All DOE Office Websites (Extended Search)

NTP005 NTP005 Revision 2 Effective December 1, 2004 Electric Vehicle Rough Road Course Test Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Ryan Harkins Approved by: _________________________________________________ Date: _______________ Donald B. Karner ©2004 Electric Transportation Applications All Rights Reserved Procedure ETA-NTP005 Revision 2 2 TABLE OF CONTENTS 1.0 Objectives 3 2.0 Purpose 3 3.0 Documentation 3 4.0 Initial Conditions and Prerequisites 4 5.0 Testing Activity Requirements 6 6.0 Glossary 12 7.0 References 14 Appendices Appendix A - Electric Vehicle Rough Road Test Data Sheet 15

127

Thermal test options  

SciTech Connect

Shipping containers for radioactive materials must be qualified to meet a thermal accident environment specified in regulations, such at Title 10, Code of Federal Regulations, Part 71. Aimed primarily at the shipping container design, this report discusses the thermal testing options available for meeting the regulatory requirements, and states the advantages and disadvantages of each approach. The principal options considered are testing with radiant heat, furnaces, and open pool fires. The report also identifies some of the facilities available and current contacts. Finally, the report makes some recommendations on the appropriate use of these different testing methods.

Koski, J.A.; Keltner, N.R.; Sobolik, K.B.

1993-02-01T23:59:59.000Z

128

QualityAssurance&Testing  

NLE Websites -- All DOE Office Websites (Extended Search)

and Testing and Testing Manufacturing Technologies The Manufacturing Science & Technology Center provides customers with manufacturing quality requirements, testing standards and specifica- tions for new product designs, including the implementation of these requirements into final product acceptance complete with documenta- tion. Technical support and procedures are fur- nished for Interagency Product Acceptance. Capabilities * Will inspect printed circuit (PC) boards, wire wrap boards, boxes, chassis, cables, racks, systems, etc. * Work from sketches or formal drawings * Review drawings and requirements * Visual inspections for layout, markings, solder joints, components, mechanical assembly, general workmanship, safety * Point-to-point continuity checks

129

Requirements engineering with ORM  

Science Conference Proceedings (OSTI)

The number of IT project overspends and failures suggest that many IT projects do not conform to requirements. Despite decades of development the IT industry still seems to lack an effective method of ensuring that a project will be right first time. ...

Ken Evans

2005-10-01T23:59:59.000Z

130

Requirements for Xenon International  

Science Conference Proceedings (OSTI)

This document defines the requirements for the new Xenon International radioxenon system. The output of this project will be a Pacific Northwest National Laboratory (PNNL) developed prototype and a manufacturer-developed production prototype. The two prototypes are intended to be as close to matching as possible; this will be facilitated by overlapping development cycles and open communication between PNNL and the manufacturer.

Hayes, James C.; Ely, James H.

2013-09-26T23:59:59.000Z

131

Training requirements. - 19...  

NLE Websites -- All DOE Office Websites (Extended Search)

G H I J K L M N O P Q R S T U V W X Y Z www.OSHA.gov Regulations (Standards - 29 CFR) Training requirements. - 1926.454 Regulations (Standards - 29 CFR) - Table of Contents * Part...

132

EV America Skid Test Procedure  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 Revision 2 Effective October 1, 2007 Braking Test Prepared by Electric Transportation Applications Prepared by: _______________________________ Date: _________ Roberta Brayer Approved by: _________________________________________________ Date: _______________ Donald Karner Procedure ETA-HTP06 Revision 2 i TABLE OF CONTENTS 1. Objectives 1 2. Purpose 1 3. Documentation 1 4. Initial Conditions and Prerequisites 1 5. Testing Activity Requirements 3 5.3 Dry Controlled Test 4 6. Glossary 5 7. References 7 Appendices Appendix A - Handling Pad Test Data Sheet 8

133

NERSC Requirements Workshop November  

NLE Websites -- All DOE Office Websites (Extended Search)

Requirements Requirements Workshop November 2009 Lattice gauge theory and some other HE theory Doug Toussaint (University of Arizona) Help from: Paul Mackenzie (Fermilab) Crude comparison of lattice hadron spec- trum to the real world. Lattice Gauge Theory First-principles computations in QCD Also, computations in other strongly coupled field theories * Find hadronic factors to get fundamental physics from experi- ments * Understand structure and interactions of hadrons, maybe even nuclei * Understand QCD: confinement and chiral symmetry breaking * Other strongly interacting theories (what if we don't find the Higgs?) * Quark-gluon matter at high temeratures (RHIC, LHC, early uni- verse) or high densities (neutron stars) HEP theory projects at NERSC now: * Production and analysis of QCD configurations with dynamical quarks, (Doug Toussaint) (MILC collaboration) * Heavy quarks, using

134

Support Requirements for Synfuels  

E-Print Network (OSTI)

Producing synfuels from coal is technically feasible. Projects have a high probability of success but risks do exist (technical, marketing, environmental delays, regulatory and political changes, etc.). The various segments of the developing synfuels industry are identified. For each segment its characteristics, uncertainties and risks are discussed, as well as the type of support of guarantee required to develop this portion of the synfuels industry.

Hyland, M. J.

1981-01-01T23:59:59.000Z

135

BER Science Network Requirements  

Science Conference Proceedings (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In April 2010 ESnet and the Office of Biological and Environmental Research, of the DOE Office of Science, organized a workshop to characterize the networking requirements of the science programs funded by BER. The requirements identified at the workshop are summarized and described in more detail in the case studies and the Findings section. A number of common themes emerged from the case studies and workshop discussions. One is that BER science, like many other disciplines, is becoming more and more distributed and collaborative in nature. Another common theme is that data set sizes are exploding. Climate Science in particular is on the verge of needing to manage exabytes of data, and Genomics is on the verge of a huge paradigm shift in the number of sites with sequencers and the amount of sequencer data being generated.

Dart, Eli; Tierney, Brian

2010-11-01T23:59:59.000Z

136

MITG test procedure and results  

DOE Green Energy (OSTI)

Elements and modules for Radioisotope Thermoelectric Generator have been performance tested since the inception of the RTG program. These test articles seldom resembled flight hardware and often lacked adequate diagnostic instrumentation. Because of this, performance problems were not identified in the early stage of program development. The lack of test data in an unexpected area often hampered the development of a problem solution. A procedure for conducting the MITG Test was developed in an effort to obtain data in a systematic, unambiguous manner. This procedure required the development of extensive data acquisition software and test automation. The development of a facility to implement the test procedure, the facility hardware and software requirements, and the results of the MITG testing are the subject of this paper.

Eck, M.B.; Mukunda, M.

1983-01-01T23:59:59.000Z

137

TESTING TECHNIQUE  

Science Conference Proceedings (OSTI)

... The cooling bath should ... When testing super-high energy level specimens ... upon the resolution of the scale or readout device at the low end and the ...

2012-10-09T23:59:59.000Z

138

Test Methods  

Science Conference Proceedings (OSTI)

... of the robot, operator control unit (OCU), payload, and batteries • Tools needed ... this test method is to quantitatively evaluate the battery capacity per ...

2010-10-05T23:59:59.000Z

139

TEST & MOTION SIMULATION SYSTEMSSERVOTEST Tailored Solutions For Your Servohydraulic  

E-Print Network (OSTI)

TEST & MOTION SIMULATION SYSTEMSSERVOTEST SERVOTEST ACTUATORS Tailored Solutions For Your Servohydraulic Test And Motion Simulation System Requirements #12;TEST & MOTION SIMULATION SYSTEMSSERVOTEST qualified engineers · Founded in 1958 as a Consultancy to service the growing test market · International

140

BES Science Network Requirements  

Science Conference Proceedings (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivityfor the US Department of Energy Office of Science (SC), the single largest supporter of basic research in the physical sciences in the United States. In support of the Office ofScience programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years.

Dart, Eli; Tierney, Brian; Dart, Eli; Biocca, A.; Carlson, R.; Chen, J.; Cotter, S.; Dattoria, V.; Davenport, J.; Gaenko, A.; Kent, P.; Lamm, M.; Miller, S.; Mundy, C.; Ndousse, T.; Pederson, M.; Perazzo, A.; Popescu, R.; Rouson, D.; Sekine, Y.; Sumpter, B.; Wang, C.-Z.; Whitelam, S.; Zurawski, J.

2011-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Quality assurance and testing for safety systems  

Science Conference Proceedings (OSTI)

In this paper we identify special quality assurance and test requirements of software for safety systems and show that even the best currently available practices meet these requirements only at very high cost and by application of empirical ...

Herbert Hecht; Myron Hecht

1997-01-01T23:59:59.000Z

142

DOE Challenge Home, Washington Program Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Challenge Home Washington Program Requirements 9-1-2013 To qualify as a DOE Challenge Home, a home shall meet the minimum requirements specified below, be verified and field-tested in accordance with HERS Standards by an approved verifier, and meet all applicable codes. Builders may meet the requirements of either the Performance Path or the Prescriptive path to qualify a home. 1 Single family detached and attached dwelling units, and dwelling units in multifamily buildings with 3 stories or fewer above-grade 2,3 are eligible for qualification. DOE Challenge Home Prescriptive Path The prescriptive path provides a single set of measures that can be used to construct a DOE Challenge Home labeled home. Modeling is not required, but no tradeoffs are allowed. Follow these steps to use the prescriptive path:

143

DOE Challenge Home, California Program Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Challenge Home California Program Requirements These Program Requirements shall only be used in the State of California. To qualify as a DOE Challenge Home, a home shall meet the minimum requirements specified below, be verified and field-tested in accordance with HERS Standards by an approved verifier, and meet all applicable codes. Builders may meet the requirements of either the Performance Path or the Prescriptive path to qualify a home. 1 Single family detached and attached dwelling units, and dwelling units in multifamily buildings with 3 stories or fewer above-grade 2,3 are eligible for qualification. DOE Challenge Home Prescriptive Path The prescriptive path provides a single set of measures that can be used to construct a DOE Challenge Home labeled

144

Gunshot triangulation device testing  

NLE Websites -- All DOE Office Websites (Extended Search)

Gunshot triangulation device testing Gunshot triangulation device testing Report to the Fermilab Community Advisory Board, Oct. 28, 2010 The Fermilab security director outlined for the board last month a recurring problem of people shooting guns near the edges of the laboratory and bullets coming onto the site. Fermilab is installing a system to triangulate the gunshots to improve police response time. This will require a set-up calibration of two dozen gunshots during a total of 6 minutes at the laboratory site. The board was asked for recommendations about how and whom to inform of the test firing. In response to the board discussion, Fermilab plans to take the following actions:  The test firing will occur during the mid-day of a week day to minimize the number of residents

145

ACOUSTICAL TESTING SERVICES TEST METHOD ...  

Science Conference Proceedings (OSTI)

... IEC 60704-2-3 Household and similar electrical appliances - Test code for ... noise emitted and structure-borne vibration induced by small air- moving ...

2013-05-06T23:59:59.000Z

146

test | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

test test test test More Documents & Publications Software Testing Checklist February2GuidanceMemorandum.pdf Site Transition Plan Guidance...

147

Fulfilled and missed requirements for online reservation systems: an empirical investigation of austrian and swiss hotels  

Science Conference Proceedings (OSTI)

Temporal data are a core element of a reservation. In this paper we formulate 10 requirements and 14 sub-requirements for handling temporal data in online hotel reservation systems (OHRS) from a usability viewpoint. We test the fulfillment of these requirements ... Keywords: B2C systems, requirements engineering, reservation systems, temporal data, tests, travel, usability

Gerhard F. Knolmayer, Viola Sini, Polina Chelnokova

2013-07-01T23:59:59.000Z

148

Equipment Operational Requirements  

SciTech Connect

The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

2009-06-11T23:59:59.000Z

149

Modal testing the EOLE  

DOE Green Energy (OSTI)

Modal testing an immense and flexible wind turbine poses a number of problems. It requires innovative excitation techniques since the modal frequencies of this type of structure are quite low. Also, substantial energy must be input to the structure to obtain reasonable levels of response. In this paper, the results of the modal test of the 110 m tall EOLE wind turbine are presented which had a number of modal frequencies below 1.0 Hz. Step-relaxation and wind were used to excite the structure. 5 refs., 14 figs., 2 tabs.

Carne, T.G.; Lauffer, J.P.; Gomez, A.J.

1987-01-01T23:59:59.000Z

150

Utilization requirements. A Southern California gas company project SAGE report: utilization requirements. [Solar Assisted Gas Energy  

SciTech Connect

Utilization requirements are given and comparisons made of two phase III SAGE (solar assisted gas energy) installations in California: (1) a retrofit installation in an existing apartment building in El Toro, and (2) an installation in a new apartment building in Upland. Such testing in the field revealed the requirements to be met if SAGE-type installations are to become commercially practical on a widespread basis in electric and gas energy usage.

Barbieri, R.; Schoen, R.; Hirshberg, A.S.

1978-01-01T23:59:59.000Z

151

Biomonitoring test procedures and biological criteria  

SciTech Connect

The Water Environment Federation recently issued a special publication, Biomonitoring in the Water Environment. In this paper, the authors highlight the contents of the chapter 3, Biomonitoring Test Procedures, identify current trends in test procedures and introduce the concept of biological criteria (biocriteria). The book chapter (and this paper) focuses on freshwater and marine chronic and acute toxicity tests used in the National Pollutant Discharge Elimination System (NPDES) permits program to identify effluents and receiving waters containing toxic materials in acutely or chronically toxic concentrations. The two major categories of toxicity tests include acute tests and chronic tests. The USEPA chronic tests required in NPDEs permits have been shortened to 7 days by focusing on the most sensitive life-cycle stages; these tests are often referred to as short-term chronic tests. The type of test(s) required depend on NPDES permit requirements, objectives of the test, available resources, requirements of the test organisms, and effluent characteristics such as variability in flow or toxicity. The permit writer will determine the requirements for toxicity test(s) by considering such factors as dilution, effluent variability, and exposure variability. Whether the required test is acute or chronic, the objective of the test is to estimate the safe or no effect concentration which is defined as the concentration which will permit normal propagation of fish and other aquatic life in the receiving waters. In this paper, the authors review the types of toxicity tests, the commonly used test organisms, and the uses of toxicity test data. In addition, they briefly describe research on new methods and the use of biological criteria.

Kszos, L.A. [Oak Ridge National Lab., TN (United States); Lipschultz, M.J. [City of Las Vegas, NV (United States); Foster, W.E. [Saint Mary`s Coll., Winona, MN (United States)

1997-10-01T23:59:59.000Z

152

Test plan  

U.S. Energy Information Administration (EIA)

3.0 TEST PLAN METHODOLOGY 8. 3.1 Assumptions 8. 3.2 Methodology 8. 4.0 COMMENTS ON INITIAL VIEW OF THE DATA 16 1.0 INTRODUCTION. EIA tasked Allied ...

153

Match Pumps to System Requirements  

SciTech Connect

BestPractices Program tip sheet discussing pumping system efficiency matching pumps to system requirements

2005-10-01T23:59:59.000Z

154

HEAVY-DUTY VEHICLE IN USE EMISSION PERFORMANCE  

DOE Green Energy (OSTI)

Engines for heavy-duty vehicles are emission certified by running engines according to specified load pattern or duty cycle. In the US, the US Heavy-Duty Transient cycle has been in use already for a number of years, and Europe is, according to the requirements of the Directive 1999/96/EC gradually switching to transient-type testing. Evaluating the in-use emission performance of heavy-duty vehicles presents a problem. Taking engines out of vehicles for engine dynamometer testing is difficult and costly. In addition, engine dynamometer testing does not take into account the properties of the vehicle itself (i.e. mass, transmission etc.). It is also debatable, how well the standardized duty cycles reflect real-life -driving patterns. VTT Processes has recently commissioned a new emission laboratory for heavy-duty vehicles. The facility comprises both engine test stand and a fully transient heavy-duty chassis dynamometer. The roller diameter of the dynamometer is 2.5 meters. Regulated emissions are measured using a full-flow CVS system. The HD vehicle chassis dynamometer measurements (emissions, fuel consumption) has been granted accreditation by the Centre of Metrology and Accreditation (MIKES, Finland). A national program to generate emission data on buses has been set up for the years 2002-2004. The target is to generate emission factors for some 50 different buses representing different degree of sophistication (Euro 1 to Euro5/EEV, with and without exhaust gas aftertreatment), different fuel technologies (diesel, natural gas) and different ages (the effect of aging). The work is funded by the Metropolitan Council of Helsinki, Helsinki City Transport, The Ministry of Transport and Communications Finland and the gas company Gasum Oy. The International Association for Natural Gas Vehicles (IANGV) has opted to buy into the project. For IANGV, VTT will deliver comprehensive emission data (including particle size distribution and chemical and biological characterization of particles) for up-to-date diesel and natural gas vehicles. The paper describes the methodology used for the measurements on buses, the test matrix and some preliminary emission data on both regulated and unregulated emissions.

Nylund, N; Ikonen, M; Laurikko, J

2003-08-24T23:59:59.000Z

155

Automated Demand Response Tests  

Science Conference Proceedings (OSTI)

This report includes assessments and test results of four end-use technologies, representing products in the residential, commercial, and industrial sectors, each configured to automatically receive real-time pricing information and critical peak pricing (CPP) demand response (DR) event notifications. Four different vendors were asked to follow the interface requirements set forth in the Open Automated Demand Response (OpenADR) standard that was introduced to the public in 2008 and currently used in two ...

2008-12-22T23:59:59.000Z

156

Automated Demand Response Tests  

Science Conference Proceedings (OSTI)

This report, which is an update to EPRI Report 1016082, includes assessments and test results of four end-use vendor technologies. These technologies represent products in the residential, commercial, and industrial sectors, each configured to automatically receive real-time pricing information and critical peak pricing (CPP) demand response (DR) event notifications. Four different vendors were asked to follow the interface requirements set forth in the Open Automated Demand Response (OpenADR) Communicat...

2009-03-30T23:59:59.000Z

157

Test Automation Ant JUnit Test Automation  

E-Print Network (OSTI)

Test Automation Ant JUnit Test Automation Mohammad Mousavi Eindhoven University of Technology, The Netherlands Software Testing 2012 Mousavi: Test Automation #12;Test Automation Ant JUnit Outline Test Automation Ant JUnit Mousavi: Test Automation #12;Test Automation Ant JUnit Why? Challenges of Manual Testing

Mousavi, Mohammad

158

Advanced Vehicle Testing Activity: Energy Storage Testing  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Storage Testing to someone by E-mail Share Advanced Vehicle Testing Activity: Energy Storage Testing on Facebook Tweet about Advanced Vehicle Testing Activity: Energy...

159

Testing technology  

SciTech Connect

This bulletin from Sandia National Laboratories presents current research highlights in testing technology. Ion microscopy offers new nondestructive testing technique that detects high resolution invisible defects. An inexpensive thin-film gauge checks detonators on centrifuge. Laser trackers ride the range and track helicopters at low-level flights that could not be detected by radar. Radiation transport software predicts electron/photon effects via cascade simulation. Acoustic research in noise abatement will lead to quieter travelling for Bay Area Rapid Transport (BART) commuters.

Not Available

1993-10-01T23:59:59.000Z

160

Requirements dependencies: the emergence of a requirements network  

Science Conference Proceedings (OSTI)

We believe that the requirements at the leaf-node level of the requirements tree structure cannot be viewed in isolation and that dependencies between them exist. We pursued this notion in order to find a coherent set of requirement dependencies that ...

Vishwajeet Kulshreshtha; John Boardman; Dinesh Verma

2012-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Validation of International Atomic Energy Agency Equipment Performance Requirements  

Science Conference Proceedings (OSTI)

Performance requirements and testing protocols are needed to ensure that equipment used by the International Atomic Energy Agency (IAEA) is reliable. Oak Ridge National Laboratory (ORNL), through the US Support Program, tested equipment to validate performance requirements protocols used by the IAEA for the subject equipment categories. Performance protocol validation tests were performed in the Environmental Effects Laboratory in the categories for battery, DC power supply, and uninterruptible power supply (UPS). Specific test results for each piece of equipment used in the validation process are included in this report.

Chiaro, PJ

2004-02-17T23:59:59.000Z

162

ROCKY MOUNTAIN OILFIELD TESTING CENTER PROJECT TEST RESULTS  

NLE Websites -- All DOE Office Websites (Extended Search)

AJUST A PUMP BEAM PUMPING UNIT AJUST A PUMP BEAM PUMPING UNIT FEBRUARY 19, 1997 FC9532 / 95EC1 ROCKY MOUNTAIN OILFIELD TESTING CENTER AJUST A PUMP TEST Rosemond Manufacturing, Inc. (RMI) Prepared for: INDUSTRY PUBLICATION Prepared by: MICHAEL J. TAYLOR Project Manager February 19, 1997 650200/551107:9532 ABSTRACT The Rocky Mountain Oilfield Testing Center (RMOTC) conducted a test of a Model-2000 Ajust A Pump system at the Naval Petroleum Reserve No. 3 (NPR-3). Rosemond Manufacturing, Inc. (RMI) manufactures compact beam-pumping units that incorporate energy-efficient gear boxes. The equipment is designed to reduce operating costs and minimize maintenance labor. This report documents the equipment performance and the results of the Ajust A Pump test. The purpose of the test was to demonstrate claims of energy efficiency and reduced labor requirements. The test showed

163

SG Network System Requirements Specification  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SG Network System Requirements Specification SG Network System Requirements Specification Interim Release 3 5/17/2010 - 2 - Table of Contents Document History ....................................................................................................................................... - 3 - Revision History .......................................................................................................................................... - 3 - Preface........................................................................................................................................................ - 4 - Authors........................................................................................................................................................ - 6 -

164

4.5 Audit Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Audit Requirements Audit Requirements Audit requirements are now contained in 2 separate sub-sections. Subsection 4.5.1 contains the audit requirements for States, Local Governments and Non-Profit Organizations while subsection 4.5.2 contains the audit requirements for For-Profit Organizations. 4.5.1 Audit Requirements for States, Local Governments and Non-Profit Organizations (a) General. All States, Local Governments and Non-Profit Organizations that expend over $500,000 in Federal funds in any year are required to have a single audit conducted in accordance with OMB Circular A-133. This requirement flows down to subrecipients that meet the dollar threshold. An independent auditor shall perform the audit in accordance with the Government Auditing Standards and must: 1) audit and provide opinions on the fair presentation of the

165

Requirements for status for volume fuel cell manufacturing  

NLE Websites -- All DOE Office Websites (Extended Search)

Status for Volume Status for Volume Fuel Cell Manufacturing DOE Hydrogen Program, Washington, DC July 13-14, 2005 Requirements for Manufactured Fuel Cells Customer Requirements: Commercial Plant Study - Volume: 250,000 fuel stacks per year - Cost: $30/kw net Requirements for Manufactured Fuel Cells Commercial Volume Manufacturing - Material Utilization: >85% - Controlled Environments (Humidity, temperature, dust) - Environmentally safe direct and indirect materials - Hydrogen safety - Make or Buy Decisions on non/proprietary unit cell components - Integrated strategic supply chain - Design for Manufacturing, Assembly, and Service Requirements for Manufactured Fuel Cells Quality Control & Assurance - Accelerated tests and process parameters correlated to key product requirements (QFD)

166

test | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

test test test test More Documents & Publications 2009 ECR FINAL REPORT 2010 Final ECR 2008 Report Environmental Conflict Resolution...

167

Building security requirements with CLASP  

Science Conference Proceedings (OSTI)

Traditionally, security requirements have been derived in an ad hoc manner. Recently, commercial software development organizations have been looking for ways to produce effective security requirements.In this paper, we show how to build security ... Keywords: application security, security process, security requirements

John Viega

2005-07-01T23:59:59.000Z

168

CC Pressure Test  

SciTech Connect

The inner vessel heads including bypass and beam tubes had just been welded into place and dye penetrant checked. The vacuum heads were not on at this time but the vacuum shell was on covering the piping penetrating into the inner vessel. Signal boxes with all feed through boards, the instrumentation box, and high voltage boxes were all installed with their pump outs capped. All 1/4-inch instrumentation lines were terminated at their respective shutoff valves. All vacuum piping used for pumping down the inner vessel was isolated using o-ring sealed blind flanges. PV215A (VAT Series 12), the 4-inch VRC gate valve isolating the cyropump, and the rupture disk had to be removed and replaced with blind flanges before pressurizing due to their pressure limitations. Stresses in plates used as blind flanges were checked using Code calcualtions. Before the CC test, vacuum style blanks and clamps were hydrostatically pressure tested to 150% of the maximum test pressure, 60 psig. The Code inspector and Research Division Safety had all given their approval to the test pressure and procedure prior to filling the vessel with argon. The test was a major success. Based on the lack of any distinguishable pressure drop indicated on the pressure gages, the vessel appeared to be structurally sound throughout the duration of the test (approx. 3 hrs.). A major leak in the instrumentation tubing was discovered at half of the maximum test pressure and was quickly isolated by crimping and capping with a compression fitting. There were some slight deviations in the actual procedure used. The 44 psig relief valve located just outside the cleanroom had to be capped until the pressure in the vessel indicated 38 psi. This was to allow higher supply pressures and hence, higher flows through the pressurizing line. Also, in order to get pressure readings at the cryostat without exposing any personnel to the potentially dangerous stored energy near the maximum test pressure, a camera was installed at the top of the vessel to view the indicator mounted there. The monitor was viewed at the ante room adjacent to the cleanroom. The holding pressure of 32 psig (4/5 of the maximum test pressure) was only maintained for about 20 minutes instead of the half hour recommendation in the procedure. We felt that this was sufficient time to Snoop test and perform the pressure drop test. After the test was completed, the inspector for CBI Na-Con and the Research Divison Safety Officer signed all of required documentation.

Dixon, K.; /Fermilab

1990-07-12T23:59:59.000Z

169

DESIGN AND CONSTRUCTION OF HEAT EXCHANGER TEST STAND WITH INITIAL TEST RESULTS.  

E-Print Network (OSTI)

??Continual development of internal combustion engines requires greater performance from liquid coolants and heat exchangers to maintain optimal temperature. For the purpose of experimental testing… (more)

Albrecht, Daniel David

2009-01-01T23:59:59.000Z

170

Inspection system performance test procedure  

SciTech Connect

This procedure establishes requirements to administer a performance demonstration test. The test is to demonstrate that the double-shell tank inspection system (DSTIS) supplied by the contractor performs in accordance with the WHC-S-4108, Double-Shell Tank Ultrasonic Inspection Performance Specification, Rev. 2-A, January, 1995. The inspection system is intended to provide ultrasonic (UT) and visual data to determine integrity of the Westinghouse Hanford Company (WHC) site underground waste tanks. The robotic inspection system consists of the following major sub-systems (modules) and components: Mobile control center; Deployment module; Cable management assembly; Robot mechanism; Ultrasonic testing system; Visual testing system; Pneumatic system; Electrical system; and Control system.

Jensen, C.E.

1995-01-17T23:59:59.000Z

171

Operational test report for LERF Basin 242AL-44 integrity test  

SciTech Connect

This operational test report documents the results of LERF operational testing per operational test procedure (OTP) TFPE-WP-0231, ``LERF Basin Integrity Testing.`` The primary purpose of the OTP was to resolve test exceptions generated as a result of TFPE-WP-0184. The TOP was prepared and performed in accordance with WHC-SD-534-OTP-002, ``Operational Test Plan for the 242-A Evaporator Upgrades and the Liquid Effluent Retention Facility.`` WHC-S-086, ``Specification for Operational Testing of the Liquid Effluent Retention Facility, Basin Integrity Testing,`` identified the test requirements and acceptance criteria. The completed, signed-off test procedure is contained in Appendix A. The test log is contained in Appendix B. Section 2.1 describes all the test exceptions written during performance of the Operational Test Procedure. The test revisions generated during the testing are discussed in Section 2.2. The dispositioned test exception forms are contained in Appendix C.

Galioto, T.M.

1994-11-08T23:59:59.000Z

172

Microgrid Testing  

Science Conference Proceedings (OSTI)

With the publication of IEEE 1574.4 Guide for Design, Operation, and Integration of Distributed Resource Island Systems with Electric Power Systems, there is an increasing amount of attention on not only the design and operations of microgrids, but also on the proper operation and testing of these systems. This standard provides alternative approaches and good practices for the design, operation, and integration of microgrids. This includes the ability to separate from and reconnect to part of the utility grid while providing power to the islanded power system. This presentation addresses the industry need to develop standardized testing and evaluation procedures for microgrids in order to assure quality operation in the grid connected and islanded modes of operation.

Shirazi, M.; Kroposki, B.

2012-01-01T23:59:59.000Z

173

200 Area treated effluent disposal facility operational test specification  

Science Conference Proceedings (OSTI)

This document identifies the test specification and test requirements for the 200 Area Treated Effluent Disposal Facility (200 Area TEDF) operational testing activities. These operational testing activities, when completed, demonstrate the functional, operational and design requirements of the 200 Area TEDF have been met.

Crane, A.F.

1995-01-12T23:59:59.000Z

174

200 Area treated effluent disposal facility operational test specification  

Science Conference Proceedings (OSTI)

This document identifies the test specification and test requirements for the 200 Area Treated Effluent Disposal Facility (200 Area TEDF) operational testing activities. These operational testing activities, when completed, demonstrate the functional, operational and design requirements of the 200 Area TEDF have been met.

Crane, A.F.

1995-02-02T23:59:59.000Z

175

Communications Requirements for Plug-in Electric Vehicles  

Science Conference Proceedings (OSTI)

This report describes a set of functional requirements for Plug-in Electric Vehicle communications in a manner that can be utilized to evaluate multiple technologies. In conjunction with another technical update focusing on test requirements for the communications technologies, this document provides a roadmap to selecting an appropriate communications technology for SAE (Society of Automotive Engineers) Standard J2931.

2010-12-31T23:59:59.000Z

176

Smokeless Gasoline Fire Test  

SciTech Connect

As a result of the recent concern by environmentalists, the hypothetical accident thermal test can no longer be performed by simply burning gasoline in an open pit. The uncontrolled open pit technique creates thick, dense, black clouds of smoke which are not permitted by local authorities. This paper deals with the design of the fire test facility and the techniques used to eliminate the smoke plume. The techniques include the addition of excess air to the fire in combination with a spray of water mist near the fuel surface. The excess air technique has been used successfully in an experimental setup; it was found that the temperature could be controlled in the neighborhood of the required 1475 degrees F environment and the smoke could be reduced to very low levels. The water spray technique has been successfully used by others in similar applications and, on completion of a permanent fire test facility at Mound Laboratory (anticipated July, 1974), test results will be available. The water is believed to interact with the combustion reaction to provide more complete combustion. The permanent facility will be a 10 x 10 ft cement block enclosure lined with firebrick. It will be 8 ft high on three sides and 4 ft high on one side to provide for observation of the test. A 5000 gal underground tank provides storage for the aviation gasoline which is gravity fed to the fire.

Williams, H.; Griffin, J. F.

1974-04-01T23:59:59.000Z

177

A New Approach to Component Testing  

E-Print Network (OSTI)

Carefully tested electric/electronic components are a requirement for effective hardware-in-the-loop tests and vehicle tests in automotive industry. A new method for definition and execution of component tests is described. The most important advantage of this method is independance from the test stand. It therefore offers the oppportunity to build up knowledge over a long period of time and the ability to share this knowledge with different partners.

Brinkmeyer, Horst

2011-01-01T23:59:59.000Z

178

Data Requirements from NERSC Requirements Reviews Richard Gerber...  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Scientists represented by the NERSC user community have growing requirements for data storage, IO bandwidth, networking bandwidth, and data software and services. Over the...

179

An Improved Test Case Generation Method of Pair-Wise Testing  

Science Conference Proceedings (OSTI)

Pair-wise testing is a testing criterion based on specification, which requires that for each pair of parameters, every combination of their valid value should be covered by at least one test case in the test set. This paper presents an improved method ...

Qian Feng-an; Jiang Jian-hui

2007-10-01T23:59:59.000Z

180

Acceptance test specifications for test number eleven: sodium system filling, heatup, pressurization, and drain. [LMFBR  

SciTech Connect

This document provides the general instructions for performing acceptance test number eleven as indicated in the Acceptance Test Index (TI-022-130-003). Also indicated are the plant conditions and special equipment required to conduct the test. The acceptance criteria for each portion of the test are specified.

Bell, C.R.

1975-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Bus Research and Testing Program Heavy-duty Chassis Dynamometer and Emissions Testing Facility  

E-Print Network (OSTI)

Bus Research and Testing Program Heavy-duty Chassis Dynamometer and Emissions Testing Facility, hydrocarbons and carbon dioxide from transit buses and heavy-duty vehicles when they are tested on simulated includes a heavy-duty chassis dynamometer, required for conducting these tests, as well as a heavy

Lee, Dongwon

182

GEOCHEMICAL TESTING AND MODEL DEVELOPMENT - RESIDUAL TANK WASTE TEST PLAN  

SciTech Connect

This Test Plan describes the testing and chemical analyses release rate studies on tank residual samples collected following the retrieval of waste from the tank. This work will provide the data required to develop a contaminant release model for the tank residuals from both sludge and salt cake single-shell tanks. The data are intended for use in the long-term performance assessment and conceptual model development.

CANTRELL KJ; CONNELLY MP

2010-03-09T23:59:59.000Z

183

Managing System of Systems Requirements with a Requirements Screening Group  

SciTech Connect

Figuring out an effective and efficient way to manage not only your Requirement’s Baseline, but also the development of all your individual requirements during a Program’s/Project’s Conceptual and Development Life Cycle Stages can be both daunting and difficult. This is especially so when you are dealing with a complex and large System of Systems (SoS) Program with potentially thousands and thousands of Top Level Requirements as well as an equal number of lower level System, Subsystem and Configuration Item requirements that need to be managed. This task is made even more overwhelming when you have to add in integration with multiple requirements’ development teams (e.g., Integrated Product Development Teams (IPTs)) and/or numerous System/Subsystem Design Teams. One solution for tackling this difficult activity on a recent large System of Systems Program was to develop and make use of a Requirements Screening Group (RSG). This group is essentially a Team made up of co-chairs from the various Stakeholders with an interest in the Program of record that are enabled and accountable for Requirements Development on the Program/Project. The RSG co-chairs, often with the help of individual support team, work together as a Program Board to monitor, make decisions on, and provide guidance on all Requirements Development activities during the Conceptual and Development Life Cycle Stages of a Program/Project. In addition, the RSG can establish and maintain the Requirements Baseline, monitor and enforce requirements traceability across the entire Program, and work with other elements of the Program/Project to ensure integration and coordination.

Ronald R. Barden

2012-07-01T23:59:59.000Z

184

General requirements. - 1926.451  

NLE Websites -- All DOE Office Websites (Extended Search)

and manual hoists shall be tested by a qualified testing laboratory. 1926.451(d)(14) Gasoline-powered equipment and hoists shall not be used on suspension scaffolds....

185

Ex H (Rev. 7) Exhibit H Quality Assurance Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Ex H (Rev. 7) Exhibit H Quality Assurance Requirements Ex H (Rev. 7) Exhibit H Quality Assurance Requirements Dated: 3-25-13 Subcontract No. 241314 Page 1 of 6 EXHIBIT "H" QUALITY ASSURANCE REQUIREMENTS TABLE OF CONTENTS QC Title Page QC-02 DESIGN/CHANGE CONTROL FOR SUBCONTRACTOR PROVIDED DESIGN (May 2008) . 2 QC-06 CERTIFICATE OF CONFORMANCE (Standard) (May 2012) .................................................. 2 QC-07 MANUFACTURING, INSPECTION AND TEST PROCEDURES (Jun 2011) ........................... 2 QC-08 INSPECTION, EXAMINATION, AND TEST REPORTS (Sept 2011) ....................................... 2 QC-11 ENGINEERING DRAWINGS (Sept 2011) ................................................................................. 2

186

Project X functional requirements specification  

SciTech Connect

Project X is a multi-megawatt proton facility being developed to support intensity frontier research in elementary particle physics, with possible applications to nuclear physics and nuclear energy research, at Fermilab. A Functional Requirements Specification has been developed in order to establish performance criteria for the Project X complex in support of these multiple missions. This paper will describe the Functional Requirements for the Project X facility and the rationale for these requirements.

Holmes, S.D.; Henderson, S.D.; Kephart, R.; Kerby, J.; Mishra, S.; Nagaitsev, S.; Tschirhart, R.; /Fermilab

2011-03-01T23:59:59.000Z

187

Requirements Specifications For Hybrid Systems  

E-Print Network (OSTI)

this paper is to present a formal framework for representing and reasoning about the requirements of hybrid systems. As background, the paper briefly reviews an abstract model for specifying system and software requirements, called the Four Variable Model [12], and a related requirements method, called SCR (Software Cost Reduction) [10, 1]. The paper then introduces a special discrete version of the Four Variable Model, the SCR requirements model [8] and proposes an extension of the SCR model for specifying and reasoning about hybrid systems. 2 Background

Constance Heitmeyer

1996-01-01T23:59:59.000Z

188

Animal carcinogen testing challenged  

SciTech Connect

The past 15 years have seen a long list of man-made chemicals indicated as potential human carcinogens. Now, a prominent cancer researcher says that the risks of those chemicals have been overestimated partly because of a serious design flaw in the animal tests used to assess their carcinogenicity. The researcher, Bruce Ames of the University of California, Berkeley, has become well known for his views that many of the newsmaking carcinogens pose little risk to the general human population. He also argues that current policies for testing and regulating carcinogens, which emphasize synthetic chemicals, are misdirected. In animal tests the chemicals are usually administered in the maximum tolerated doses (MTDs), which are the highest doses that can be given without causing severe weight loss or other life-threatening signs of toxicity. Even though these levels are much higher than the doses to which people are likely to be exposed, MTDs are used to cut down on the number of animals- and thus the cost-required to obtain statistically significant results. Although the MTDs don't cause overt signs of toxicity, they can still have more subtle toxic effects, however, and that is what Ames thinks accounts for the large number of compounds that test positive for carcinogenicity.

Marx, J.

1990-11-09T23:59:59.000Z

189

Aflatoxin Test Kit Laboratory Proficiency Testing  

Science Conference Proceedings (OSTI)

Lab proficiency testing for Aflatoxin test kit to determine Total Aflatoxins.Samples include Peanut Paste, Corn Meal, Milk. Aflatoxin Test Kit Laboratory Proficiency Testing Laboratory Proficiency Program (LPP) aocs applicants certified chemist chemists

190

MINIMUM SECURITY REQUIREMENTS FOR FEDERAL  

E-Print Network (OSTI)

March 2006 MINIMUM SECURITY REQUIREMENTS FOR FEDERAL INFORMATION AND INFORMATION SYSTEMS: FEDERAL INFORMATION PROCESSING STANDARD (FIPS) 200 APPROVED BY THE SECRETARY OF COMMERCE MINIMUM SECURITY REQUIREMENTS BY THE SECRETARY OF COMMERCE Shirley Radack, EditorShirley Radack, Editor Computer Security Division

191

Handbook of Academic Requirements & Procedures  

E-Print Network (OSTI)

Handbook of Academic Requirements & Procedures for the Chemistry Graduate Program PLEASE NOTE: This version of the Handbook must be used by students who start during or after the Spring 2012 semester is a central activity. 1.2 Purpose and Content of the Handbook. A detailed account of the academic requirements

Kounaves, Samuel P.

192

Handbook of Academic Requirements & Procedures  

E-Print Network (OSTI)

Handbook of Academic Requirements & Procedures for the Chemistry Graduate Program PLEASE NOTE: This version of the Handbook can be used by students who started during or before the Fall 2011 semester activity. 1.2 Purpose and Content of the Handbook. A detailed account of the academic requirements

Kounaves, Samuel P.

193

Humidity requirements in WSCF Laboratories  

SciTech Connect

The purpose of this paper is to develop and document a position on Relative Humidity (RH) requirements in the WSCF Laboratories. A current survey of equipment vendors for Organic, Inorganic and Radiochemical laboratories indicate that 25% - 80% relative humidity may meet the environmental requirements for safe operation and protection of all the laboratory equipment.

Evans, R.A.

1994-10-01T23:59:59.000Z

194

RADIOACTIVE MATERIAL PACKAGING TORQUE REQUIREMENTS COMPLIANCE  

Science Conference Proceedings (OSTI)

Shipping containers used to transport radioactive material (RAM) in commerce employ a variety of closure mechanisms. Often, these closure mechanisms require a specific amount of torque be applied to a bolt, nut or other threaded fastener. It is important that the required preload is achieved so that the package testing and analysis is not invalidated for the purpose of protecting the public. Torque compliance is a means of ensuring closure preload, is a major factor in accomplishing the package functions of confinement/containment, sub-criticality, and shielding. This paper will address the importance of applying proper torque to package closures, discuss torque value nomenclature, and present one methodology to ensure torque compliance is achieved.

Watkins, R.; Leduc, D.

2011-03-24T23:59:59.000Z

195

Integrated Geothermal Well Testing: Test Objectives and Facilities  

DOE Green Energy (OSTI)

A new and highly integrated geothermal well test program was designed for three geothermal operators in the US (MCR, RGI and Mapco Geothermal). This program required the design, construction and operation of new well test facilities. The main objectives of the test program and facilities are to investigate the critical potential and worst problems associated with the well and produced fluids in a period of approximately 30 days. Field and laboratory investigations are required to determine and quantify the problems of fluid production, utilization and reinjection. The facilities are designed to handle a flow rate from a geothermal well of one million pounds per hour at a wellhead temperature of approximately 268 C (515 F). The facilities will handle an entire spectrum of temperature and rate conditions up to these limits. All pertinent conditions for future fluid exploitations can be duplicated with these facilities, thus providing critical information at the very early stages of field development. The new well test facilities have been used to test high temperature, liquid-dominated geothermal wells in the Imperial Valley of California. The test facilities still have some problems which should be solvable. The accomplishments of this new and highly integrated geothermal well test program are described in this paper.

Nicholson, R. W.; Vetter, O. J.

1981-01-01T23:59:59.000Z

196

Test conditions for evaluating natural gas storage properties of adsorbents. Topical report, December 1993-March 1994  

SciTech Connect

The growing interest in using adsorbed natural gas (ANG) as a vehicle fuel has led to requests for information about adsorbent property and performance requirements. The general lack of comprehensive technical information about these issues points to the need for expanded data gathering and analysis efforts. The technical information compiled in this report should assist gas industry personnel and others in developing reliable testing protocols for evaluating adsorbent properties and assessing the performance of ANG as a vehicle fuel.

Tramposch, W.G.

1994-09-01T23:59:59.000Z

197

Nitrogen chiller acceptance test procedure  

SciTech Connect

This document includes the inspection and testing requirements for the Nitrogen Chiller unit. The Chiller will support the Rotary Mode core Sampling System during the summer. The Chiller cools the Nitrogen Purge Gas that is used when drilling in tank wastes to cool the drill bit.

Kostelnik, A.J.

1995-03-07T23:59:59.000Z

198

Motor Vehicle Parts Compliance Requirements  

Science Conference Proceedings (OSTI)

... The OVSC compliance testing program is a strong incentive for manufacturers of motor vehicles and items of motor vehicle equipment to ...

2012-09-24T23:59:59.000Z

199

Home: Directives, Delegations, and Requirements  

NLE Websites -- All DOE Office Websites

content. | Skip to navigation content. | Skip to navigation Site Map Contact Us Current Documents Archived Documents Entire Site only in current section Advanced Search... U.S. Department of Energy Office of Management Directives, Delegations, and Requirements Sections Home Directives Current Directives Draft Directives Archives Delegations Current Delegations Current Designations Rescinded Organizations' Assignment of Responsibility Development & Review RevCom Writers' Tools DPC Corner References News and Updates Help Personal tools You are here: Office of Management » Directives, Delegations, and Requirements Info Home Directives are the Department of Energy's primary means of establishing policies, requirements, responsibilities, and procedures for Departmental elements and contractors. Directive

200

Cyber Security Issues and Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Program (SGIG) Cyber Security Issues and Requirements Jeff Dagle November 19, 2009 Communication and Information Technology will be Central to Smart Grid Deployment Final Interim Smart Grid Roadmap, prepared by the Electric Power Research Institute (EPRI) for the National Institute of Standards and Technology (NIST) Cyber Security Requirements Associated with ARRA Projects Proposals were required to include:  Discussion of how cyber security risks will be mitigated  What criteria will be used for vendor and technology selection  Relevant cyber security standards that will be followed (or industry best practices)  How emerging smart grid cyber security standards that are currently being developed will be adopted Cyber Security Objectives for Smart

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Distributed Power Program DER Pilot Test at the Nevada Test Site  

SciTech Connect

The DOE Distributed Power Program conducted a pilot test of interconnection test procedures November 12-16, 2001 at Area 25 of the Nevada Test Site (NTS). The objective of this pilot test was to respond to Congressional direction in the Energy and Water Development Appropriations Act of 2001 to complete a distributed power demonstration at the Nevada Test Site and validated interconnection tests in the field. The demonstration consisted of field verification of tests in IEEE P1547 (Draft 7) that are required for interconnection of distributed generation equipment to electrical power systems. Some of the testing has been conducted in a laboratory setting, but the Nevada Test Site provided a location to verify the interconnection tests in the field. The testing also provided valuable information for evaluating the potential for the Nevada Test Site to host future field-testing activities in support of Distributed Energy Resources System Integration R&D.

Kroposki, B.; DeBlasio, R.; Galdo, J.

2002-05-01T23:59:59.000Z

202

Monitored Geologic Repository Test Evaluation Plan  

SciTech Connect

The Monitored Geologic Repository test & evaluation program will specify tests, demonstrations, examinations, and analyses, and describe procedures to conduct and document testing necessary to verify meeting Monitored Geologic Repository requirements for a safe and effective geologic repository for radioactive waste. This test program will provide assurance that the repository is performing as designed, and that the barriers perform as expected; it will also develop supporting documentation to support the licensing process and to demonstrate compliance with codes, standards, and regulations. This comprehensive program addresses all aspects of verification from the development of test requirements to the performance of tests and reporting of the test results. The ''Monitored Geologic Repository Test & Evaluation Plan'' provides a detailed description of the test program approach necessary to achieve the above test program objectives. This test plan incorporates a set of test phases focused on ensuring repository safety and operational readiness and implements a project-wide integrated product management team approach to facilitate test program planning, analysis, and implementation. The following sections provide a description of the individual test phases, the methodology for test program planning and analyses, and the management approach for implementing these activities.

M.B. Skorska

2002-01-02T23:59:59.000Z

203

The test data challenge for database-driven applications  

Science Conference Proceedings (OSTI)

Business applications rely typically on databases for storing and processing their data (database-driven applications, or DBAPs). Testing DBAPs requires testing the application logic plus the interaction between the application logic and the database. ... Keywords: databases, information systems, test coverage, test data, testing

Klaus Haller

2010-06-01T23:59:59.000Z

204

Automating the mutation testing of aspect-oriented Java programs  

Science Conference Proceedings (OSTI)

Aspect-Oriented Programming has introduced new types of software faults that may be systematically tackled with mutation testing. However, such testing approach requires adequate tooling support in order to be properly performed. This paper addresses ... Keywords: aspect-oriented programming, mutation testing, test automation, testing tools

Fabiano Cutigi Ferrari; Elisa Yumi Nakagawa; Awais Rashid; José Carlos Maldonado

2010-05-01T23:59:59.000Z

205

Evaluation tests for photovoltaic concentrator receiver sections and modules  

DOE Green Energy (OSTI)

Sandia has developed a third-generation set of specifications for performance and reliability testing of photovoltaic concentrator modules. Several new requirements have been defined. The primary purpose of the tests is to screen new concentrator designs and new production runs for susceptibility to known failure mechanisms. Ultraviolet radiation testing of materials precedes receiver section and module performance and environmental tests. The specifications include the purpose, procedure, and requirements for each test. Recommendations for future improvements are presented.

Woodworth, J.R.; Whipple, M.L.

1992-06-01T23:59:59.000Z

206

land requirements | OpenEI  

Open Energy Info (EERE)

requirements requirements Dataset Summary Description This dataset is part of a larger internal dataset at the National Renewable Energy Laboratory (NREL) that explores various characteristics of large solar electric (both PV and CSP) facilities around the United States. This dataset focuses on the land use characteristics for solar facilities that are either under construction or currently in operation. Source Land-Use Requirements for Solar Power Plants in the United States Date Released June 25th, 2013 (5 months ago) Date Updated Unknown Keywords acres area average concentrating solar power csp Density electric hectares km2 land land requirements land use land-use mean photovoltaic photovoltaics PV solar statistics Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon Master Solar Land Use Spreadsheet (xlsx, 1.5 MiB)

207

The Practice of Parking Requirements  

E-Print Network (OSTI)

the cost of the required parking is thus $20 per square foot$40 per square foot of floor area, or twice the cost in aper 1,000 square feet in a TOD, and the developer's cost of

Shoup, Donald C.

2006-01-01T23:59:59.000Z

208

Physics and detector simulation requirements  

Science Conference Proceedings (OSTI)

‘‘This document describes the computing environment needed to meet the requirements for high energy physics Monte Carlo Calculations for the simulation of Superconducting Super Collider Laboratory physics and detectors.’’ (AIP)

Computer Acquisition Working Group

1990-01-01T23:59:59.000Z

209

SofTV Viewer Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

may be required to view all features in a presentations where build steps and animations are published. (This feature can be turned off) Netscape 7.1+ Presentations created...

210

Manifest requirements. RCRA Information Brief  

Science Conference Proceedings (OSTI)

Specific pretransport regulatory requirements must be met by DOE prior to shipment of hazardous waste, low-level wastes (LLW), and radioactive mixed wastes (RMW). The pretransport requirements are intended to help reduce the risk of loss or leakage of, or exposure to, hazardous wastes, LLW, and RMW during shipment; and to communicate information on potential hazards to shippers, carriers, or receivers of waste shipments, and emergency response personnel in the event of an accident, spill, or leak. These goals are accomplished through tracking of shipments, correct packaging and labeling, and communication of potential hazards. Specific requirements include manifesting, packaging, marking and labeling of waste packages, placarding of vehicles, and selecting appropriate waste transporters and shipment destinations. This Information Brief focuses on the manifesting requirements associated with domestic transport of hazardous wastes, LLW, and RMW.

Not Available

1994-04-01T23:59:59.000Z

211

OpenEI - land requirements  

Open Energy Info (EERE)

en.openei.orgdatasetstaxonomyterm4180 en Land use requirements for ground-mounted solar power facilities. http:en.openei.orgdatasetsnode454

This dataset is part of...

212

Fusion technology status and requirements  

SciTech Connect

This paper summarizes the status of fusion technology and discusses the requirements to be met in order to build a demonstration fusion plant. Strategies and programmatic considerations in pursuing engineering feasibility are also outlined.

Thomassen, K.I.

1982-01-26T23:59:59.000Z

213

Functional Requirements for Customer Communications  

Science Conference Proceedings (OSTI)

Customer communications infrastructures could support a wide variety of useful utility operations and industry-wide applications. However, these systems will require a substantial investment, which necessitates viewing customer communications with multiple stakeholders and applications in mind. This report describes the development of requirements for customer interface applications such as revenue metering, communications gateways, and remote equipment operations that can provide the basis for powerful ...

2002-12-18T23:59:59.000Z

214

Renewable Energy Requirement Status: 2005  

Science Conference Proceedings (OSTI)

The potential impacts of renewable portfolio standards (RPS) and other requirements are significant for electricity generation, transmission, and distribution companies, especially for those that depend on coal and other fossil fuels to supply the power delivered to their customers. this Technical Update is to update the information presented in the previous EPRI report, Renewable Energy Requirement Status and Compliance Strategies: 2004 (1008374, December 2004). Although the assessment focuses on state ...

2006-03-30T23:59:59.000Z

215

Test Plan: WIPP bin-scale CH TRU waste tests  

SciTech Connect

This WIPP Bin-Scale CH TRU Waste Test program described herein will provide relevant composition and kinetic rate data on gas generation and consumption resulting from TRU waste degradation, as impacted by synergistic interactions due to multiple degradation modes, waste form preparation, long-term repository environmental effects, engineered barrier materials, and, possibly, engineered modifications to be developed. Similar data on waste-brine leachate compositions and potentially hazardous volatile organic compounds released by the wastes will also be provided. The quantitative data output from these tests and associated technical expertise are required by the WIPP Performance Assessment (PA) program studies, and for the scientific benefit of the overall WIPP project. This Test Plan describes the necessary scientific and technical aspects, justifications, and rational for successfully initiating and conducting the WIPP Bin-Scale CH TRU Waste Test program. This Test Plan is the controlling scientific design definition and overall requirements document for this WIPP in situ test, as defined by Sandia National Laboratories (SNL), scientific advisor to the US Department of Energy, WIPP Project Office (DOE/WPO). 55 refs., 16 figs., 19 tabs.

Molecke, M.A.

1990-08-01T23:59:59.000Z

216

Increased Software Reliability Through Input Validation Analysis and Testing  

Science Conference Proceedings (OSTI)

The Input Validation Testing (IVT) technique has been developed to address the problem of statically analyzing input command syntax as defined in English textual interface and requirements specifications and then generating test cases for input validation ... Keywords: Software reliability, requirements analysis, system testing, quality control and assurance, interfaces, input validation

Jane Huffman Hayes; A. Jefferson Offutt

1999-11-01T23:59:59.000Z

217

Molten salt test loop  

DOE Green Energy (OSTI)

The objective of the Molten Salt Test Loop Project was to design, construct, and demonstrate operation of an outdoor high temperature molten salt test facility. This facility is operational, and can now be used to evaluate materials and components, and the design features and operating procedures required for molten salt heat transport systems. The initial application of the loop was to demonstrate the feasibility of using molten salt as the heat transport medium for a high temperature distributed collector system. A commercially available eutectic salt blend is used as the heat transfer fluid. This salt has a composition of 40% NaNO/sub 2/, 7% NaNO/sub 3/, and 53% KNO/sub 3/ and is marketed under the trade name Hitec. It has a freezing (solidifying) point of 142/sup 0/C (288/sup 0/F) and has been satisfactorily used at temperatures as high as 594/sup 0/C (1100/sup 0/F). General Atomic (GA) installed a row of Fixed Mirror Solar Concentrators (FMSC's) in the loop. The system was started up and a test program conducted. Startup went smoothly, with the exception of some burned-out trace heaters. Salt temperatures as high as 571/sup 0/C (1060/sup 0/F) were achieved.

Schuster, J.R.; Eggers, G.H.

1980-01-01T23:59:59.000Z

218

Test and Test Equipment Joshua Lottich  

E-Print Network (OSTI)

Test and Test Equipment Joshua Lottich CMPE 640 11/23/05 #12;Testing Verifies that manufactured chip meets design specifications. Cannot test for every potential defect. Modeling defects as faults allows for passing and failing of chips. Ideal test would capture all defects and pass only chips

Patel, Chintan

219

Test Preparation Options Free Test Prep Websites  

E-Print Network (OSTI)

Test Preparation Options Free Test Prep Websites ACT: http: http://www.collegeboard.com/student/testing/sat/prep_one/test.html http://www.number2.com://testprep.princetonreview.com/CourseSearch/Search.aspx?itemCode=17&productType=F&rid=1&zip=803 02 Test Prep Classes Front Range Community College: Classes

Stowell, Michael

220

Test plan : reducing soft costs of rooftop solar installations attributed to structural considerations.  

SciTech Connect

This test plan is a document that provides a systematic approach to the planned testing of rooftop structures to determine their actual load carrying capacity. This document identifies typical tests to be performed, the responsible parties for testing, the general feature of the tests, the testing approach, test deliverables, testing schedule, monitoring requirements, and environmental and safety compliance.

Dwyer, Stephen F.

2013-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

MECHANICAL TEST LAB CAPABILITIES  

E-Print Network (OSTI)

MECHANICAL TEST LAB CAPABILITIES · Static and cyclic testing (ASTM and non-standard) · Impact drop testing · Slow-cycle fatigue testing · High temperature testing to 2500°F · ASTM/ Boeing/ SACMA standard testing · Ability to design and fabricate non-standard test fixtures and perform non-standard tests

222

Resampling Hypothesis Tests for Autocorrelated Fields  

Science Conference Proceedings (OSTI)

Presently employed hypothesis tests for multivariate geophysical data (e.g., climatic fields) require the assumption that either the data are serially uncorrelated, or spatially uncorrelated, or both. Good methods have been developed to deal with ...

D. S. Wilks

1997-01-01T23:59:59.000Z

223

Science-Driven Network Requirements for ESnet  

E-Print Network (OSTI)

Neutron Source Network Requirements Six DOE laboratories arehas networking requirements which differ from many other DOEhas networking requirements which differ from many other DOE

2006-01-01T23:59:59.000Z

224

Large scale test simulations using the Virtual Environment for Test Optimization (VETO)  

SciTech Connect

The Virtual Environment for Test Optimization (VETO) is a set of simulation tools under development at Sandia to enable test engineers to do computer simulations of tests. The tool set utilizes analysis codes and test information to optimize design parameters and to provide an accurate model of the test environment which aides in the maximization of test performance, training, and safety. Previous VETO effort has included the development of two structural dynamics simulation modules that provide design and optimization tools for modal and vibration testing. These modules have allowed test engineers to model and simulate complex laboratory testing, to evaluate dynamic response behavior, and to investigate system testability. Further development of the VETO tool set will address the accurate modeling of large scale field test environments at Sandia. These field test environments provide weapon system certification capabilities and have different simulation requirements than those of laboratory testing.

Klenke, S.E.; Heffelfinger, S.R.; Bell, H.J.; Shierling, C.L.

1997-10-01T23:59:59.000Z

225

Functional requirements for gas characterization system computer software  

DOE Green Energy (OSTI)

This document provides the Functional Requirements for the Computer Software operating the Gas Characterization System (GCS), which monitors the combustible gasses in the vapor space of selected tanks. Necessary computer functions are defined to support design, testing, operation, and change control. The GCS requires several individual computers to address the control and data acquisition functions of instruments and sensors. These computers are networked for communication, and must multi-task to accommodate operation in parallel.

Tate, D.D.

1996-01-01T23:59:59.000Z

226

Test Anxiety: A Test of Attentional Bias.  

E-Print Network (OSTI)

??Test anxiety is characterized by apprehension, panic, and ruminating thoughts of potential failure that are experienced during an exam situation. In a test conscious society,… (more)

Lawson, Darla Jane

2006-01-01T23:59:59.000Z

227

Advanced Vehicle Testing Activity: Energy Storage Testing  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Storage Testing The Advanced Vehicle Testing Activity is tasked by the U.S. Department of Energy's Vehicle Technologies Office to conduct various types of energy storage...

228

Testing FAQs HAVA Certification and Testing  

Science Conference Proceedings (OSTI)

... In the marketplace, testing provides a vehicle for exchanging information ... For sellers (eg, manufacturers), testing can help to substantiate claims that ...

2012-11-02T23:59:59.000Z

229

OMB Requirements | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

OMB Requirements OMB Requirements OMB Requirements Acquisitions OMB Circular A-109, Acquisition of Major Systems (04-05-76) (Available in hard copy only) OMB M-04-08, Maximizing Use of SmartBuy and Avoiding Duplication of Agency Activities with with the President's 24 E-Gov Initiatives (02-25-2004) (pdf) OMB M-04-16, Software Acquisition (07-01-2004) Budget/Capital Planning OMB Circular A-11 OMB M-05-23, Improving Informational Technology (IT) Project Planning and Execution (8-04-2005) (pdf) Cyber Security & Privacy OMB M-00-07, Incorporating and Funding Security in Information Systems Investments (02-28-2000) OMB M-02-01, Guidance for Preparing and Submitting Security Plans of Action and Milestones(10-19-2001) OMB M-02-09, Reporting Instructions for the Government Information

230

New Solutions Require New Thinking  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solutions Require Solutions Require New Thinking America's demand for power threatens to overburden an already congested electric system. The U.S. Department of Energy is addressing these energy challenges with innovative solutions to energy generation. Its Renewable and Distributed Systems Integration (RDSI) Program is helping to alleviate congestion, reduce greenhouse gas emissions, and improve reliability by investigating answers such as * Microgrid technologies * Distributed generation * Two-way communication systems * Demand response programs Reducing Peak Demand The RDSI program aims to reduce peak load on distribution feeders 20% by 2015. To help achieve this goal, RDSI is sponsoring demonstration projects nationwide. From California to New York, these projects are

231

RPAM & Energy Order Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

430.1C, Real Property Asset Management 430.1C, Real Property Asset Management and DOE O 430.2B, Departmental Energy, Renewable Energy and Transportation Management Requirements, Overlap & Differences Office of Engineering and Construction Management September 2009 2 10/27/2009 Energy Order & RPAM Order Requirements DOE O 430.1C - RPAM DOE O 430.2B ENERGY ORDER Energy Efficiency Water Consumption Utility Metering ESPCs & USPCs Personnel - Energy Training Environmental Management System (EMS) Real Property Performance Indicators Sustainable Buildings Facilities Information Management System (FIMS) Personnel - Certified Realty Specialists Ten Year Site Plans Sustainable & Integrated Design TEAM Executable Plans High Performance Building Plan OVERLAP Real Property

232

Stellar Astrophysics Requirements NERSC Forecast  

NLE Websites -- All DOE Office Websites (Extended Search)

Requirements for Requirements for m461:Stellar Explosions in Three Dimensions Tomek Plewa (Florida State University) + 3 graduate students, Artur Gawryszczak (Warsaw), Konstantinos Kifonidis (Munich), Andrzej Odrzywolek (Cracow), Ju Zhang (FIT), Andrey Zhiglo (Kharkov) 1. m461: Stellar Explosions in Three Dimensions * Summarize your projects and expected scientific objectives through 2014 * Modeling and simulations of transient phenomena in stellar astrophysics driven by either radiation or thermonuclear processes * Numerical solution of a coupled system of PDEs and ODEs * Tame nonlinearity! * Our goal is to ... * Explain observed properties of exploding stellar objects * Present focus is ... * Neutrino-driven core-collapse supernova explosions * In the next 3 years we expect to ...

233

Meeting Federal Energy Security Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Markel Markel SRA International Lawrence_Markel@sra.com Federal Utility Partnership Working Group Fall 2012 - October 16-17 Mobile, AL Sponsored by Alabama Power Theme Meeting energy security requirements in federal facilities provides opportunities for additional types of cooperation between utilities and the federal agencies. However, there are significant barriers to pursuing these opportunities - constraints on utilities and on federal agencies, as well as sometimes-competing objectives. Energy security encompasses sufficiency, surety, and sustainability.  Above all, energy security means having adequate power to conduct critical operations for the duration required (sufficiency).  Secondarily, and leading to sufficiency, is ensuring resilient energy supplies that are accessible when

234

In-place HEPA filter penetration test  

SciTech Connect

We have demonstrated the feasibility of conducting penetration tests on high efficiency particulate air (HEPA) filters as installed in nuclear ventilation systems. The in-place penetration test, which is designed to yield equivalent penetration measurements as the standard DOP efficiency test, is based on measuring the aerosol penetration of the filter installation as a function of particle size using a portable laser particle counter. This in-place penetration test is compared to the current in-place leak test using light scattering photometers for single HEPA filter installations and for HEPA filter plenums using the shroud method. Test results show the in-place penetration test is more sensitive than the in-place leak test, has a similar operating procedure, but takes longer to conduct. Additional tests are required to confirm that the in-place penetration test yields identical results as the standard dioctyl phthalate (DOP) penetration test for HEPA filters with controlled leaks in the filter and gasket and duct by-pass leaks. Further development of the procedure is also required to reduce the test time before the in- place penetration test is practical.

Bergman, W.; Wilson, kK.; Elliott, J.; Bettencourt, B.; Slawski, J.W.

1997-01-01T23:59:59.000Z

235

Baseline LAW Glass Formulation Testing  

Science Conference Proceedings (OSTI)

The major objective of the baseline glass formulation work was to develop and select glass formulations that are compliant with contractual and processing requirements for each of the LAW waste streams. Other objectives of the work included preparation and characterization of glasses with respect to the properties of interest, optimization of sulfate loading in the glasses, evaluation of ability to achieve waste loading limits, testing to demonstrate compatibility of glass melts with melter materials of construction, development of glass formulations to support ILAW qualification activities, and identification of glass formulation issues with respect to contract specifications and processing requirements.

Kruger, Albert A. [USDOE Office of River Protection, Richland, WA (United States); Mooers, Cavin [The Catholic University of America, Washington, DC (United States). Vitreous State Lab.; Bazemore, Gina [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Pegg, Ian L. [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Hight, Kenneth [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Lai, Shan Tao [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Buechele, Andrew [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Rielley, Elizabeth [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Gan, Hao [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Muller, Isabelle S. [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Cecil, Richard [The Catholic University of America, Washington, DC (United States). Vitreous State Lab

2013-06-13T23:59:59.000Z

236

Vaccine refrigerator testing. Final report  

SciTech Connect

For the Central American Health Clinic Project initiated in 1986, Sandia National Laboratories and the Florida Solar Energy Center recognized the need for a test and evaluation program for vaccine refrigeration systems. At the Florida Solar Energy Center, side-by-side testing of three photovoltaic powered vaccine refrigerators began in 1987. The testing was expanded in 1988 to include a kerosene absorption refrigerator. This report presents observations, conclusions, and recommendations derived from testing the four vaccine refrigeration systems. Information is presented pertaining to the refrigerators, photovoltaic arrays, battery subsystems, charge controllers, and user requirements. This report should be of interest to designers, manufacturers, installers, and users of photovoltaic-powered vaccine refrigeration systems and components.

Ventre, G.G. [Univ. of Central Florida, Orlando, FL (United States); Kilfoyle, D.; Marion, B. [Florida Solar Energy Center, Cape Canaveral, FL (United States)

1990-06-01T23:59:59.000Z

237

ALLOCATION OF REACTIVE SUPPORT REQUIREMENTS  

E-Print Network (OSTI)

the voltage setting point s kV of each bus Qk and the voltage profile for the buses c j Q . Recall that Q for these transactions so that all bus voltages meet the specified voltage profile requirements. Consequently load is locally met at the bus. In other words, we assume that at each load bus the power factor is 1

Gross, George

238

Enhanced oil recovery water requirements  

SciTech Connect

Water requirements for enhanced oil recovery (EOR) are evaluated using publicly available information, data from actual field applications, and information provided by knowledgeable EOR technologists in 14 major oil companies. Water quantity and quality requirements are estimated for individual EOR processes (steam drive; in situ combustion; and CO/sub 2/, micellar-polymer, polymer, and caustic flooding) in those states and specific geographic locations where these processes will play major roles in future petroleum production by the year 2000. The estimated quantity requirements represent the total water needed from all sources. A reduction in these quantities can be achieved by reinjecting all of the produced water potentially available for recycle in the oil recovery method. For injection water quality requirements, it is noted that not all of the water used for EOR needs to be fresh. The use of treated produced water can reduce significantly the quantities of fresh water that would be sought from other sources. Although no major EOR project to date has been abandoned because of water supply problems, competing regional uses for water, drought situations, and scarcity of high quality surface water and ground water could be impediments to certain projects in the near future.

Royce, B.; Kaplan, E.; Garrell, M.; Geffen, T.M.

1983-03-01T23:59:59.000Z

239

Test Methods for the Tensile Evaluation of Ceramic Fibers  

Science Conference Proceedings (OSTI)

Abstract Scope, Test methods for the determination of tensile strength of ceramic fibers will be reviewed. The withdrawal of ASTM D3379 and the requirements in ...

240

Phased Startup Initiative Phases 3 and 4 Test Plan and Test Specification (OCRWM)  

SciTech Connect

Construction for the Spent Nuclear Fuel (SNF) Project facilities is continuing per the Level III Baseline Schedule, and installation of the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) in K West Basin is now complete. In order to accelerate the project, a phased start up strategy to initiate testing of the FRS and IWTS early in the overall project schedule was proposed (Williams 1999). Wilkinson (1999) expands the definition of the original proposal into four functional testing phases of the Phased Startup Initiative (PSI). Phases 1 and 2 are based on performing functional tests using dummy fuel. These tests are described in separate planning documents. This test plan provides overall guidance for Phase 3 and 4 tests, which are performed using actual irradiated N fuel assemblies. The overall objective of the Phase 3 and 4 testing is to verify how the FRS and IWTS respond while processing actual fuel. Conducting these tests early in the project schedule will allow identification and resolution of equipment and process problems before they become activities on the start-up critical path. The specific objectives of this test plan are to: (1) Define the test scope for the FRS and IWTS; (2) Provide detailed test requirements that can be used to write the specific test procedures; (3) Define data required and measurements to be taken. Where existing methods to obtain these do not exist, enough detail will be provided to define required additional equipment; and (4) Define specific test objectives and acceptance criteria.

PITNER, A.L.

2000-02-28T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Risk effectiveness evaluation of surveillance testing  

SciTech Connect

In nuclear power plants surveillance tests are required to detect failures in standby safety system components as a means of assuring their availability in case of an accident. However, the performance of surveillance tests at power may have adverse impact on safety as evidenced by the operating experience of the plants. The risk associated with a test includes two different aspects: (1) a positive aspect, i.e., risk contribution detected by the test, that results from the detection of failures which occur between tests and are detected by the test, and (2) a negative aspect, i.e., risk contribution caused by the test, that includes failures and degradations which are caused by the test or are related to the performance of the test. In terms of the two different risk contributions, the risk effectiveness of a test can be simply defined as follows: a test is risk effective if the risk contribution detected by the test is greater than the risk contribution caused by the test; otherwise it is risk ineffective. The methodology presentation will focus on two important kinds of negative test risk impacts, that is, the risk impacts of test-caused transients and equipment wear-out. The evaluation results of the risk effectiveness of the test will be presented in the full paper along with the risk assessment methodology and the insights from the sensitivity analysis. These constitute the core of the NUREG/CR-5775.

Martorell, S.; Kim, I.S. (Universidad Politecnica de Valencia (Spain). Dept. de Ingenieria Quimica y Nuclear); Samanta, P.K. (Brookhaven National Lab., Upton, NY (United States)); Vesely, W.E. (Science Applications International Corp., Columbus, OH (United States))

1992-07-20T23:59:59.000Z

242

Optimization Online - Test  

E-Print Network (OSTI)

Jan 25, 2006 ... Test. Andrew Goldberg (goldberg ***at*** cs.wisc.edu). Abstract: Test. Keywords: Test. Category 1: Infinite Dimensional Optimization ...

243

PNNI Routing Interoperability Tests)  

Science Conference Proceedings (OSTI)

... The individual tests are written in TCL. There is a one for one correspondence between the tests in TCL and the tests described ...

244

Face Vendor Recognition Test  

Science Conference Proceedings (OSTI)

... FRVT 2002 consisted of two tests: the High ... goal of the Recognition Performance Test was to ... All systems were tested on a standardized database. ...

2013-07-25T23:59:59.000Z

245

Healthcare Message Test Generation  

Science Conference Proceedings (OSTI)

... a tool that creates a suite of test message instances ... to support an actor based testing framework and ... administer and analyze the results of the tests. ...

2013-06-13T23:59:59.000Z

246

ECT-Test-Methods  

Science Conference Proceedings (OSTI)

ECT-Test-Methods. A, B, C, D. 1, NVLAP ECT Test Method Selection List (updated 2013-12-02). 2, 3, Standard Category, Test ...

2013-12-02T23:59:59.000Z

247

BESTEST Test Suites  

NLE Websites -- All DOE Office Websites (Extended Search)

BESTEST Test Suites BESTEST (Building Energy Simulation TEST) is a method for testing, diagnosing, and validating the capabilities of building energy simulation programs. The...

248

USGv6 Testing Program  

Science Conference Proceedings (OSTI)

... their own list of tested products accessible ... items arising include soliciting test laboratories and ... participate in the USGv6 testing program, soliciting ...

2013-06-02T23:59:59.000Z

249

Tension-Compression Testing  

Science Conference Proceedings (OSTI)

Tension-Compression Testing. ... version of the tension-compression test, to enable ... loading around draw-beads, where calibration tests must include ...

2013-04-10T23:59:59.000Z

250

Test Advising Framework.  

E-Print Network (OSTI)

??Test cases are represented in various formats depending on the process, the technique or the tool used to generate the tests. While different test case… (more)

Wang, Yurong

2013-01-01T23:59:59.000Z

251

Directed Test Suite Augmentation.  

E-Print Network (OSTI)

??Test suite augmentation techniques are used in regression testing to identify code elements affected by changes and to generate test cases to cover those elements.… (more)

Xu, Zhihong

2013-01-01T23:59:59.000Z

252

CRUSH TESTING OF 9977 GENERAL PURPOSE FISSILE PACKAGINGS  

SciTech Connect

The 9977 General Purpose Fissile Package (GPFP) was designed in response to the adoption of the crush test requirement in the US regulations for packages for radioactive materials (10 CFR 71). This presentation on crush testing of the 9977 GPFP Reviews origins of Crush Test Requirements and implementation of crush test requirements in 10 CFR 71. SANDIA testing performed to support the rule making is reviewed. The differences in practice, on the part of the US Department of Energy from those required by the NRC for commercial purposes, are explained. The design features incorporated into the 9977 GPFP to enable it to withstand the crush test and the crush tests performed on the 9977 are described. Lessons learned from crush testing of GPFP packagings are given.

Smith, A.

2010-07-28T23:59:59.000Z

253

Automated testing as an aid to systems integration  

Science Conference Proceedings (OSTI)

Within BT‘s Systems Integration department, the integration and testing of large, complex software systems often requires large and complex test regimes. Optimising the activities and time-scales within this part of the life cycle will invariably ...

I. D. Hicks; G. J. South; A. O. Oshisanwo

1997-07-01T23:59:59.000Z

254

200 Area treated effluent disposal facility operational test report  

Science Conference Proceedings (OSTI)

This document reports the results of the 200 Area Treated Effluent Disposal Facility (200 Area TEDF) operational testing activities. These completed operational testing activities demonstrated the functional, operational and design requirements of the 200 Area TEDF have been met.

Crane, A.F.

1995-03-01T23:59:59.000Z

255

Hypothesis testing for auto-correlated short climate time series  

Science Conference Proceedings (OSTI)

Commonly used statistical tests of hypothesis, also termed inferential tests, which are available to meteorologists and climatologists all require independent data in the time series to which they are applied. Unfortunately, most of the time ...

Virginie Guemas; Ludovic Auger; Francisco J. Doblas-Reyes

256

Nevada Test Site Waste Acceptance Criteria (NTSWAC)  

SciTech Connect

This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, Nevada Test Site Waste Acceptance Criteria (NTSWAC). The NTSWAC provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive (LLW) and LLW Mixed Waste (MW) for disposal.

NNSA /NSO Waste Management Project

2008-06-01T23:59:59.000Z

257

ROCKY MOUNTAIN OILFIELD TESTING CENTER  

NLE Websites -- All DOE Office Websites (Extended Search)

SAM III PROJECT SAM III PROJECT Sandia National laboratories Prepared for: Project File Documentation Prepared by: MICHAEL J. TAYLOR Project Manager March 31, 1998 JO 850200 : FC 970009 ABSTRACT The Rocky Mountain Oilfield Testing Center (RMOTC) conducted a demonstration of the Surface Area Modulation Downhole Telemetry System (SAM 111) at the Department of Energy's Naval Petroleum Reserve No. 3 (NPR-3), in partnership with Sandia National Laboratories (SNL). The project encompassed the testing of a real-time wireless telemetry system in a simulated Measurement-While-Drilling (MWD) environment. A Surface Area Modulation (SAM) technique demonstrated data transmission rates greater than present techniques, in a deployment mode which requires

258

Drug Testing for New Clearance Holders  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Drug Testing Prerequisite for DOE Security Clearance Applicants Drug Testing Prerequisite for DOE Security Clearance Applicants The following matrix identifies those individuals required to have a current negative drug test as a prerequisite for being processed for a security clearance. A current test is one taken within 60 calendar days of the individual's SF-86/SF-86C signature date. For those cases where no such form is collected (e.g. reciprocity) the test must have been taken within 60 calendar days of the date of the request for security clearance. Current Status Clearance Action Test Required? Uncleared - Applicant Grant (Q/L, T/S/C) Yes Previously Cleared DOE-now uncleared DOE Reinstate (Q/L, T/S/C) Yes* Coming from another Federal agency, regardless of clearance status Grant (Q/L, T/S/C) Yes**

259

Drug Testing for New Clearance Holders  

NLE Websites -- All DOE Office Websites (Extended Search)

Drug Testing Prerequisite for DOE Security Clearance Applicants Drug Testing Prerequisite for DOE Security Clearance Applicants The following matrix identifies those individuals required to have a current negative drug test as a prerequisite for being processed for a security clearance. A current test is one taken within 60 calendar days of the individual's SF-86/SF-86C signature date. For those cases where no such form is collected (e.g. reciprocity) the test must have been taken within 60 calendar days of the date of the request for security clearance. Current Status Clearance Action Test Required? Uncleared - Applicant Grant (Q/L, T/S/C) Yes Previously Cleared DOE-now uncleared DOE Reinstate (Q/L, T/S/C) Yes* Coming from another Federal agency, regardless of clearance status Grant (Q/L, T/S/C) Yes**

260

CANMET Gasifier Liner Coupon Material Test Plan  

SciTech Connect

The test plan detailed in this topical report supports Task 1 of the project titled ''Development of Technologies and Capabilities for Coal Energy Resources - Advanced Gasification Systems Development (AGSD)''. The purpose of these tests is to verify that materials planned for use in an advanced gasifier pilot plant will withstand the environments in a commercial gasifier. Pratt & Whitney Rocketdyne (PWR) has developed and designed the cooled liner test assembly article that will be tested at CANMET Energy Technology Centre (CETC-O) in Ottawa, Ontario, Canada (CETC-O). The Test Plan TP-00364 is duplicated in its entirety, with formatting changes to comply with the format required for this Topical Report. The table of contents has been modified to include the additional material required by this topical report. Test Request example and drawings of non-proprietary nature are also included as appendices.

Mark Fitzsimmons; Alan Darby; Fred Widman

2005-10-30T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

CANMET Gasifier Liner Coupon Material Test Plan  

SciTech Connect

The test plan detailed in this topical report supports Task 1 of the project titled ''Development of Technologies and Capabilities for Coal Energy Resources - Advanced Gasification Systems Development (AGSD)''. The purpose of these tests is to verify that materials planned for use in an advanced gasifier pilot plant will withstand the environments in a commercial gasifier. Pratt & Whitney Rocketdyne (PWR) has developed and designed the cooled liner test assembly article that will be tested at CANMET Energy Technology Centre (CETC-O) in Ottawa, Ontario, Canada (CETC-O). The Test Plan TP-00364 is duplicated in its entirety, with formatting changes to comply with the format required for this Topical Report. The table of contents has been modified to include the additional material required by this topical report. Test Request example and drawings of non-proprietary nature are also included as appendices.

Mark Fitzsimmons; Alan Darby; Fred Widman

2005-10-30T23:59:59.000Z

262

Test report for cesium powder and pellets inner container decontamination method determination test  

SciTech Connect

This report documents the decontamination method determination testing that was performed on three cesium powder and pellets inner container test specimens The test specimens were provided by B and W Hanford Company (BVMC). The tests were conducted by the Numatec Hanford Company (NHC), in the 305 Building. Photographic evidence was also provided by NHC. The Test Plan and Test Report were provided by Waste Management Federal Services, Inc., Northwest Operations. Witnesses to testing included a test engineer, a BC project engineer, and a BC Quality Assurance (QA) representative. The Test Plan was modified with the mutual decision of the test engineer, the BWHC project engineer, and the BVMC QA representative. The results of this decision were written in red (permanent type) ink on the official copy of the test procedure, Due to the extent of the changes, a summary of the test results are provided in Section 3.0 of this Test Report. In addition, a copy of the official copy field documentation obtained during testing is included in Appendix A. The original Test Plan (HNF-2945) will be revised to indicate that extensive changes were required in the field during testing, however, the test documentation will stand as is (i.e., it will not be retyped, text shaded, etc.) due to the inclusion of the test parameters and results into this Test Report.

Kelly, D.L.

1998-08-17T23:59:59.000Z

263

Calmac Ice Storage Test report  

DOE Green Energy (OSTI)

The Ice Storage Test Facility (ISTF) is designed to test commercial ice storage systems. Calmac provided a storage tank equipped with coils designed for use with a secondary fluid system. The Calmac ice storage system was tested over a wide range of operating conditions. Measured system performance during charging was similar to that reported by the manufacturer. Both the measured average and minimum brine temperatures were in close agreement with Calmac's literature values, and the ability to fully charge the tank was relatively unaffected by charging rate and brine flow rate. During discharge cycles, the storage tank outlet temperature was strongly affected by the discharge rate. The discharge capacity was dependent upon both the selected discharge rate and maximum allowable tank outlet temperature. Based on these tests, storage tank selection must depend most strongly on the discharge conditions required to serve the load. This report describes Calmac system performance fully under both charging and discharging conditions. Companion reports describe ISTF test procedures and ice-making efficiency test results that are common to many of the units tested. 11 refs., 31 figs., 9 tabs.

Stovall, T.K.

1991-08-01T23:59:59.000Z

264

Nano-science Safety Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Nano-science Safety Requirements Effective Date 12/6/2011 Nano-science Safety Requirements Effective Date 12/6/2011 The only official copy of this file is the one on-line. Before using a printed copy, verify that it is the most current version by checking the effective date. Page 1 of 3 Prepared By: L. Stiegler Low Risk - Embedded or Fixed Nanostructures (nanomaterials, incapable as a practical matter, of becoming airborne) Ensure that fixed nanomaterials are not subjected to actions that may generate Unbound NanoParticles (UNP). * For work outside of a HEPA filtered exhaust hood: o No Mechanical stresses e.g., (grinding, scraping, or pressing). o No thermal stresses o Cover samples when practical e.g., (slide cover, Kapton tape, Mylar tape, or cellophane tape). Samples/container must be labeled if not used immediately.

265

Functional Requirements and Use Cases  

E-Print Network (OSTI)

iously also beneficial in information systems development, staging core functionality for early releases and adding features over the course of several subsequent releases. In many industries, companies produce product lines with different cost/feature variations per product in the line, and product families that include a number of product lines targeted at somewhat different markets or usage situations. What makes these product lines part of a family, are some common elements of functionality and identity. A platform-based development approach leverages this commonality, utilizing a set of reusable assets across the family. These strategies have important implications for software architecture. In particular, it is not just the functional requirements of the first product or release that must be supported by the architecture. The functional requirements of early (nearly concurrent) releases need to be explicitly taken into account. Later releases are accommodated through architectu

System Has Properties; Ruth Malan; Dana Bredemeyer

2005-01-01T23:59:59.000Z

266

Evaluate deaerator steam requirements quickly  

Science Conference Proceedings (OSTI)

Steam plant engineers frequently have to perform energy balance calculations around the deaerator to estimate the steam required to preheat and deaerate the make-up water and condensate returns. This calculation involves solving two sets of equations, one for mass and the other for energy balance. Reference to steam tables is also necessary. However, with the help of this program written in BASIC, one can arrive at the make-up water and steam requirements quickly, without referring to steam tables. This paper shows the mass and energy balance equations for the deaerator. This paper gives the program listing. An number of condensate returns can be handled. An example illustrates the use of the program.

Ganapathy, V. (ABCO Industries, Inc., Abilene, TX (US))

1991-02-01T23:59:59.000Z

267

Requirements for signaling channel authentication  

SciTech Connect

This contribution addresses requirements for ATM signaling channel authentication. Signaling channel authentication is an ATM security service that binds an ATM signaling message to its source. By creating this binding, the message recipient, and even a third party, can confidently verify that the message originated from its claimed source. This provides a useful mechanism to mitigate a number of threats. For example, a denial of service attack which attempts to tear-down an active connection by surreptitiously injecting RELEASE or DROP PARTY messages could be easily thwarted when authenticity assurances are in place for the signaling channel. Signaling channel authentication could also be used to provide the required auditing information for accurate billing which is impervious to repudiation. Finally, depending on the signaling channel authentication mechanism, end-to-end integrity of the message (or at least part of it) can be provided. None of these capabilities exist in the current specifications.

Tarman, T.D.

1995-12-11T23:59:59.000Z

268

Quality Assurance Requirements and Description  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

QjCivilianRadioactive QjCivilianRadioactive Was'fe Management QA: QA QVALITY ASSURANCE REQUIREMENTS AND DESCRIPTION DOEIRW-0333P Revisiol1 20 Effective Date: 10-01-2008 LarrY Newman, DlrectQr Office of Quality As,surance ~~--~-_._._- Edward F. Spr at III, Di or Office of Civilian Radioactive Waste Management Date I/Jf/4t' , . - - - Date OCRWM Title: Quality Assurance Requirements and Description DOEIRW-0333P, Revision 20 Office of Civilian Radioactive Waste Management Quality Assurance Policy Page: 2 of 160 Successful implementation of the Office of Civilian Radioactive Waste Management (OCRWM) Quality Assurance (QA) program is essential for the OCRWM to carry out its mission. Our mission is to manage and dispose ofbigh-Ievel radioactive waste and spent nuclear fuel in a manner that protects health, safety, and the environment; enhances national and energy security; and merits

269

Present and Future Computing Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

for Computational Cosmology for Computational Cosmology DES LSST Presenter: Salman Habib Argonne National Laboratory Jim Ahrens (LANL) Scott Dodelson (FNAL) Katrin Heitmann (ANL) Peter Nugent (LBNL) Anze Slosar (BNL) Risa Wechsler (SLAC) 1 Cosmic Frontier Computing Collaboration Computational Cosmology SciDAC-3 Project Ann Almgren (LBNL) Nick Gnedin (FNAL) Dave Higdon (LANL) Rob Ross (ANL) Martin White (UC Berkeley/ LBNL) Large Scale Production Computing and Storage Requirements for High Energy Physics Research A DOE Technical Program Review November 27-28, 2012

270

LCLS Heavy Met Outgassing Tests  

Science Conference Proceedings (OSTI)

A Heavy Met that is 95% tungsten, 3% nickel and 2% iron and sintered to 100% density and is Ultra High Vacuum (UHV) compatible is proposed for use as the X-ray slit in the Front End Enclosure and the Fixed Mask for the Linac Coherent Light Source (LCLS). The Heavy Met was tested in the LLNL Vacuum Sciences and Engineering Lab (VSEL) to determine its outgassing rate and its overall compatibility with the vacuum requirements for LCLS.

Kishiyama, K. I.

2010-12-01T23:59:59.000Z

271

Turbine Oil Lubrication Compatibility Testing  

Science Conference Proceedings (OSTI)

EPRI's Nuclear Maintenance Application Center (NMAC) has been assisting member utilities with Lubrication issues for a number of years. This assistance includes providing answers to lubrication related problems over the phone, testing samples sent by members, providing written answers when required, publication of the NMAC newsletter (Lube Notes) once a year, and providing a Lubrication Guide which provides guidance on lubrication technology and practices that relate to the nuclear power industry. Part o...

2004-07-27T23:59:59.000Z

272

Error analysis in wind turbine field testing  

DOE Green Energy (OSTI)

In wind turbine field testing, one of the most important issues is understanding and accounting for data errors. Extended dynamic testing of wind turbines requires a thorough uncertainty analysis and a regimen of quality assurance steps in order to preserve accuracy. Test objectives need to be identified to determine the accuracy requirements of any data measurement, collection, and analysis process. Frequently, the uncertainty analysis reveals that the major sources of error can be allowed for with careful calibration and signal drift tracking procedures. This paper offers a basis for the discussion and development of a repeatable and accurate process to track errors and account for them in data processing.

McNiff, B [McNiff Light Industries, Carlisle, MA (United States); Simms, D [National Renewable Energy Lab., Golden, CO (United States)

1994-08-01T23:59:59.000Z

273

W-026, acceptance test report manipulator system  

Science Conference Proceedings (OSTI)

The purpose of the WRAP Manipulator System Acceptance Test Plan (ATP) is to verify that the 4 glovebox sets of WRAP manipulator components, including rail/carriage, slave arm, master controller and auxiliary equipment, meets the requirements of the functional segments of 14590 specification. The demonstration of performance elements of the ATP are performed as a part of the Assembly specifications. Manipulator integration is integrated in the performance testing of the gloveboxes. Each requirement of the Assembly specification will be carried out in conjunction with glovebox performance tests.

Watson, T.L.

1997-04-15T23:59:59.000Z

274

Concrete Electrical Conductivity Test  

Science Conference Proceedings (OSTI)

Concrete Electrical Conductivity Test. Description/Summary: ... Details. Type of software: Virtual concrete electrical conductivity test. Authors: ...

2013-06-11T23:59:59.000Z

275

Special Tests for Thermometry  

Science Conference Proceedings (OSTI)

Special Tests for Thermometry. ... Proficiency-test artifacts (eg SPRTs); Bridge certification; Evaluation of prototype thermometric devices. ...

2013-06-11T23:59:59.000Z

276

Laboratory Corrosion Tests  

Science Conference Proceedings (OSTI)

Table 2   Laboratory corrosion tests...Salt spray test NaCl solution Ocean climate Acetic acid salt spray test NaCl + CH 3 COOH Salted roads Copper-accelerated acetic acid salt spray test As in acetic acid salt spray test As in acetic acid salt spray test, but more aggressive Immersion tests Artificial sweat test � Wearing of decorative...

277

Standards Testing Infrastructure  

Science Conference Proceedings (OSTI)

... Group Leader Information Technology Laboratory Software and ... in collaboration with health IT stakeholders ... a variety of testing services: The testing ...

2011-02-02T23:59:59.000Z

278

Home Smoke Alarm Tests  

Science Conference Proceedings (OSTI)

... alarm technologies in a controlled laboratory test ... arrangements and maximize the test instrumentation. ... Centers for Disease Control and Prevention ...

2013-07-07T23:59:59.000Z

279

Crush Testing at Oak Ridge National Laboratory  

SciTech Connect

The dynamic crush test is required in the certification testing of some small Type B transportation packages. International Atomic Energy Agency regulations state that the test article must be 'subjected to a dynamic crush test by positioning the specimen on the target so as to suffer maximum damage.' Oak Ridge National Laboratory (ORNL) Transportation Technologies Group performs testing of Type B transportation packages, including the crush test, at the National Transportation Research Center in Knoxville, Tennessee (United States). This paper documents ORNL's experiences performing crush tests on several different Type B packages. ORNL has crush tested five different drum-type package designs, continuing its 60 year history of RAM package testing. A total of 26 crush tests have been performed in a wide variety of package orientations and crush plate CG alignments. In all cases, the deformation of the outer drum created by the crush test was significantly greater than the deformation damage caused by the 9 m drop test. The crush test is a highly effective means for testing structural soundness of smaller nondense Type B shipping package designs. Further regulatory guidance could alleviate the need to perform the crush test in a wide range of orientations and crush plate CG alignments.

Feldman, Matthew R [ORNL

2011-01-01T23:59:59.000Z

280

Statistical Inference: Hypothesis Test  

E-Print Network (OSTI)

1 Statistical Inference: Hypothesis Test GOG 502/PLN 504 Youqin Huang 1 Review: The Z t ( )± Today's topic: Hypothesis Tests What is hypothesis test? Elements, steps, types of hypothesis test Significance test for a mean Small vs. large sample Significance test for proportion GOG 502/PLN 504 Youqin

Huang, Youqin

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Length requirements for numerical-relativity waveforms  

E-Print Network (OSTI)

One way to produce complete inspiral-merger-ringdown gravitational waveforms from black-hole-binary systems is to connect post-Newtonian (PN) and numerical-relativity (NR) results to create "hybrid" waveforms. Hybrid waveforms are central to the construction of some phenomenological models for GW search templates, and for tests of GW search pipelines. The dominant error source in hybrid waveforms arises from the PN contribution, and can be reduced by increasing the number of NR GW cycles that are included in the hybrid. Hybrid waveforms are considered sufficiently accurate for GW detection if their mismatch error is below 3% (i.e., a fitting factor about 0.97). We address the question of the length requirements of NR waveforms such that the final hybrid waveforms meet this requirement, considering nonspinning binaries with q = M_2/M_1 \\in [1,4] and equal-mass binaries with \\chi = S_i/M_i^2 \\in [-0.5,0.5]. We conclude that for the cases we study simulations must contain between three (in the equal-mass nonspinning case) and ten (the \\chi = 0.5 case) orbits before merger, but there is also evidence that these are the regions of parameter space for which the least number of cycles will be needed.

Mark Hannam; Sascha Husa; Frank Ohme; P. Ajith

2010-08-17T23:59:59.000Z

282

Length requirements for numerical-relativity waveforms  

E-Print Network (OSTI)

One way to produce complete inspiral-merger-ringdown gravitational waveforms from black-hole-binary systems is to connect post-Newtonian (PN) and numerical-relativity (NR) results to create ``hybrid'' waveforms. Hybrid waveforms are central to the construction of some phenomenological models for GW search templates, and for tests of GW search pipelines. The dominant error source in hybrid waveforms arises from the PN contribution, and can be reduced by increasing the number of NR GW cycles that are included in the hybrid. Hybrid waveforms are considered sufficiently accurate for GW detection if their mismatch error is below 3% (i.e., a fitting factor about 0.97). We address the question of the length requirements of NR waveforms such that the final hybrid waveforms meet this requirement, considering nonspinning binaries with q = M_2/M_1 \\in [1,4] and equal-mass binaries with \\chi = S_i/M_i^2 \\in [-0.5,0.5]. We conclude that for the cases we study simulations must contain between three (in the equal-mass nonsp...

Hannam, Mark; Ohme, Frank; Ajith, P

2010-01-01T23:59:59.000Z

283

Military power requirements and backup power considerations  

Science Conference Proceedings (OSTI)

All US Air Force (USAF) facilities have certain critical power requirements that must be met in order to carry out their mission successfully. Internal USAF studies have shown that the mission can degrade precipitously as the available power decreases below the mission critical level. Now, more than ever before, the military and private industry are finding that certain functions, such as automated data processing and automated process control, respond catastrophically to power reductions. Furthermore, increased reliance on electrical power means, in the case of the Air Force, that critical power requirements are anticipated to increase by half over the next 15 yr. For these reasons and others, the USAF is investigating several means of improving the availability of electric power under adverse conditions above that which can be provided by an off-base supplier. Among the approaches to this problem being pursued at this time are a program to improve all sorts of generator sets on a service-wide basis and the Multimegawatt Terrestrial Power (MTP) Program, which is pursuing the design and testing of a small dedicated nuclear power source to provide critical mission power. The purpose of this paper is to provide some insight into some of the issues associated with USAF power programs.

Botts, T.E.

1986-01-01T23:59:59.000Z

284

On-Chip Test Infrastructure Design for Optimal Multi-Site Testing of System Chips  

E-Print Network (OSTI)

Multi-site testing is a popular and effective way to increase test throughput and reduce test costs. We present a test throughput model, in which we focus on wafer testing, and consider parameters like test time, index time, abort-on-fail, and contact yield. Conventional multi-site testing requires sufficient ATE resources, such as ATE channels, to allow to test multiple SOCs in parallel. In this paper, we design and optimize on-chip DfT, in order to maximize the test throughput for a given SOC and ATE. The on-chip DfT consists of an E-RPCT wrapper, and, for modular SOCs, module wrappers and TAMs. We present experimental results for a Philips SOC and several ITC'02 SOC Test Benchmarks.

Goel, Sandeep Kumar

2011-01-01T23:59:59.000Z

285

Subsurface contamination focus area technical requirements. Volume II  

Science Conference Proceedings (OSTI)

This is our vision, a vision that replaces the ad hoc or {open_quotes}delphi{close_quotes} method which is to get a group of {open_quotes}experts{close_quotes} together and make decisions based upon opinion. To fulfill our vision for the Subsurface Contaminants Focus Area (SCFA), it is necessary to generate technical requirements or performance measures which are quantitative or measurable. Decisions can be supported if they are based upon requirements or performance measures which can be traced to the origin (documented) and are verifiable, i.e., prove that requirements are satisfied by inspection (show me), demonstration, analysis, monitoring, or test. The data from which these requirements are derived must also reflect the characteristics of individual landfills or plumes so that technologies that meet these requirements will necessarily work at specific sites. Other subjective factors, such as stakeholder concerns, do influence decisions. Using the requirements as a basic approach, the SCFA can depend upon objective criteria to help influence the areas of subjectivity, like the stakeholders. In the past, traceable requirements were not generated, probably because it seemed too difficult to do so. There are risks that the requirements approach will not be accepted because it is new and represents a departure from the historical paradigm.

Nickelson, D.; Nonte, J.; Richardson, J.

1996-10-01T23:59:59.000Z

286

Massachusetts Large Blade Test Facility Final Report  

DOE Green Energy (OSTI)

Project Objective: The Massachusetts Clean Energy Center (CEC) will design, construct, and ultimately have responsibility for the operation of the Large Wind Turbine Blade Test Facility, which is an advanced blade testing facility capable of testing wind turbine blades up to at least 90 meters in length on three test stands. Background: Wind turbine blade testing is required to meet international design standards, and is a critical factor in maintaining high levels of reliability and mitigating the technical and financial risk of deploying massproduced wind turbine models. Testing is also needed to identify specific blade design issues that may contribute to reduced wind turbine reliability and performance. Testing is also required to optimize aerodynamics, structural performance, encourage new technologies and materials development making wind even more competitive. The objective of this project is to accelerate the design and construction of a large wind blade testing facility capable of testing blades with minimum queue times at a reasonable cost. This testing facility will encourage and provide the opportunity for the U.S wind industry to conduct more rigorous testing of blades to improve wind turbine reliability.

Rahul Yarala; Rob Priore

2011-09-02T23:59:59.000Z

287

Fuels from microalgae: Technology status, potential, and research requirements  

DOE Green Energy (OSTI)

Although numerous options for the production of fuels from microalgae have been proposed, our analysis indicates that only two qualify for extensive development - gasoline and ester fuel. In developing the comparisons that support this conclusion, we have identified the major areas of microalgae production and processing that require extensive development. Technology success requires developing and testing processes that fully utilize the polar and nonpolar lipids produced by microalgae. Process designs used in these analyses were derived from fragmented, preliminary laboratory data. These results must be substantiated and integrated processes proposed, tested, and refined to be able to evaluate the commercial feasibility from microalgae. The production of algal feedstocks for processing to gasoline or ester fuel requires algae of high productivity and high lipid content that efficiently utilize saline waters. Species screening and development suggest that algae can achieve required standards taken individually, but algae that can meet the integrated requirements still elude researchers. Effective development of fuels from microalgae technology requires that R and D be directed toward meeting the integrated standards set out in the analysis. As technology analysts, it is inappropriate for us to dictate how the R and D effort should proceed to meet these standards. We end our role by noting that alternative approaches to meeting the feasibility targets have been identified, and it is now the task of program managers and scientists to choose the appropriate approach to assure the greatest likelihood of realizing a commercially viable technology. 70 refs., 39 figs., 35 tabs.

Neenan, B.; Feinberg, D.; Hill, A.; McIntosh, R.; Terry, K.

1986-08-01T23:59:59.000Z

288

Seismic Performance Requirements for WETF  

Science Conference Proceedings (OSTI)

This report develops recommendations for requirements on the Weapons Engineering Tritium Facility (WETF) performance during seismic events. These recommendations are based on fragility estimates of WETF structures, systems, and components that were developed by LANL experts during facility walkdowns. They follow DOE guidance as set forth in standards DOE-STD-1021-93, ''Natural Phenomena Hazards Performance Categorization Guidelines for Structures, Systems, and Components'' and DOE-STD-1020-94, ''Natural Phenomena Hazards Design and Evaluation Criteria for Department of Energy Facilities''. Major recommendations are that WETF institute a stringent combustible loading control program and that additional seismic bracing and anchoring be provided for gloveboxes and heavy equipment.

Hans Jordan

2001-01-01T23:59:59.000Z

289

A Requirements Analyst's Apprentice: A Proposal  

E-Print Network (OSTI)

The Requirements Analyst's APprentice (RAAP) partially automates the modeling process involved in creating a software requirement. It uses knowledge of the specific domain and general experience regarding software requirements ...

Reubenstein, Howard

290

Analytical Requirements for Petroleum Contaminated Soils  

E-Print Network (OSTI)

Analytical Requirements for Petroleum Contaminated Soils According to 20 NMAC 9.1.704 704. REQUIRED), or other applicable statutes. Page 1 of 1Analytical Requirements for Petroleum Contaminated Soils 4

291

Outlook and Related Information Requirements  

E-Print Network (OSTI)

This procedure provides the steps required for market participants to submit the information required for the 18-Month Outlook, and specifies the information to be contained in the Outlook. Public Disclaimer The posting of documents on this Web site is done for the convenience of market participants and other interested visitors to the IESO Web site. Please be advised that, while the IESO attempts to have all posted documents conform to the original, changes can result from the original, including changes resulting from the programs used to format the documents for posting on the Web site as well as from the programs used by the viewer to download and read the documents. The IESO makes no representation or warranty, express or implied, that the documents on this Web site are exact reproductions of the original documents listed. In addition, the documents and information posted on this Web site are subject to change. The IESO may revise, withdraw or make final these materials at any time at its sole discretion without further notice. It is solely your responsibility to ensure that you are using up-to-date documents and information.

unknown authors

2001-01-01T23:59:59.000Z

292

SmartAmerica Challenge White paper requirement  

Science Conference Proceedings (OSTI)

SmartAmerica Challenge. CPS Test Bed and Activities descriptions. We need your ideas and participation. CPS Test bed ...

2013-12-11T23:59:59.000Z

293

A computer-controlled automated test system for fatigue and fracture testing  

SciTech Connect

A computer-controlled system consisting of a servohydraulic test machine, an in-house designed test controller, and a desktop computer has been developed for performing automated fracture toughness and fatigue crack growth testing both in the laboratory and in hot cells for remote testing of irradiated specimens. Both unloading compliance and dc-potential drop can be used to monitor crack growth. The test controller includes a dc-current supply programmer, a function generator for driving the servohydraulic test machine to required test outputs, five measurement channels (each consisting of low-pass filter, track/hold amplifier, and 16-bit analog-to-digital converter), and digital logic for various control and data multiplexing functions. The test controller connects to the computer via a 16-bit wide photo-isolated bidirectional bus. The computer, a Hewlett-Packard series 200/300, inputs specimen and test parameters from the operator, configures the test controller, stores test data from the test controller in memory, does preliminary analysis during the test, and records sensor calibrations, specimen and test parameters, and test data on flexible diskette for later recall and analysis with measured initial and final crack length information. During the test, the operator can change test parameters as necessary. 24 refs., 6 figs.

Nanstad, R.K.; Alexander, D.J.; Swain, R.L.; Hutton, J.T.; Thomas, D.L.

1989-01-01T23:59:59.000Z

294

DOE Challenge Home National Program Requirements (Rev. 03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Program Requirements (Rev. 03) National Program Requirements (Rev. 03) April 17, 2013 Effective for Homes Revised April 17, 2013 Page 1 of 8 Permitted Starting 6/17/2013 To qualify as a DOE Challenge Home, a home shall meet the minimum requirements specified below, be verified and field-tested in accordance with HERS Standards by an approved verifier, and meet all applicable codes. Builders may meet the requirements of either the Performance Path or the Prescriptive path to qualify a home. 1 Single family detached and attached dwelling units, and dwelling units in multifamily buildings with 3 stories or fewer above-grade 2,3 are eligible for qualification. DOE Challenge Home Prescriptive Path The prescriptive path provides a single set of measures that can be used to construct a DOE Challenge Home labeled

295

Alternative Fuels Data Center: Emissions Reduction Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Emissions Reduction Emissions Reduction Requirements to someone by E-mail Share Alternative Fuels Data Center: Emissions Reduction Requirements on Facebook Tweet about Alternative Fuels Data Center: Emissions Reduction Requirements on Twitter Bookmark Alternative Fuels Data Center: Emissions Reduction Requirements on Google Bookmark Alternative Fuels Data Center: Emissions Reduction Requirements on Delicious Rank Alternative Fuels Data Center: Emissions Reduction Requirements on Digg Find More places to share Alternative Fuels Data Center: Emissions Reduction Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Emissions Reduction Requirements Recognizing the impact of carbon-emitting fuels on climate change and to

296

Supervisory Training Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supervisory Training Requirements Supervisory Training Requirements Supervisory Training Requirements The Office of Learning and Workforce Development has developed an inventory of training and developmental activities that will meet the supervisory training requirements. The DOE courses, Supervisory Essentials and Navigating the Federal Hiring Process are required to fulfill the first 40-hour of the probationary period mandatory training requirement for new supervisors. All other courses listed in the training framework are suggested to meet overall continual learning requirements. Supervisory Training Requirements More Documents & Publications EM's Development Program for New Managers/Supervisors Presentation DOE F 3315.1 Supervisory - Non-Supervisory Employee Performance Management and

297

Alternative Fuels Data Center: Petroleum Reduction Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Petroleum Reduction Petroleum Reduction Requirements to someone by E-mail Share Alternative Fuels Data Center: Petroleum Reduction Requirements on Facebook Tweet about Alternative Fuels Data Center: Petroleum Reduction Requirements on Twitter Bookmark Alternative Fuels Data Center: Petroleum Reduction Requirements on Google Bookmark Alternative Fuels Data Center: Petroleum Reduction Requirements on Delicious Rank Alternative Fuels Data Center: Petroleum Reduction Requirements on Digg Find More places to share Alternative Fuels Data Center: Petroleum Reduction Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Petroleum Reduction Requirements The Wisconsin Department of Administration's fleet management policy

298

Alternative Fuels Data Center: Vehicle Registration Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Vehicle Registration Vehicle Registration Requirement to someone by E-mail Share Alternative Fuels Data Center: Vehicle Registration Requirement on Facebook Tweet about Alternative Fuels Data Center: Vehicle Registration Requirement on Twitter Bookmark Alternative Fuels Data Center: Vehicle Registration Requirement on Google Bookmark Alternative Fuels Data Center: Vehicle Registration Requirement on Delicious Rank Alternative Fuels Data Center: Vehicle Registration Requirement on Digg Find More places to share Alternative Fuels Data Center: Vehicle Registration Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Vehicle Registration Requirement Motor vehicle registration applicants must provide proof of compliance with

299

ALS Beamline Design Requirements - Revision 1  

E-Print Network (OSTI)

the beamline including: • Electrical power requirements e.at the ALS include: • Electrical power: 480VAC, 208VAC, 120terminations, and electrical power requirements. Beamline

Heimann, Phil

2010-01-01T23:59:59.000Z

300

Renewable Generation Requirement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Generation Requirement Renewable Generation Requirement Eligibility Investor-Owned Utility Retail Supplier Savings For Bioenergy Buying & Making Electricity Water Solar Heating &...

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Federal Energy Management Program: Federal Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Federal Requirements to someone by E-mail Share Federal Energy Management Program: Federal Requirements on Facebook Tweet about Federal Energy Management Program: Federal...

302

Federal Energy Management Program: Energy Management Requirements...  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Management Requirements by Subject to someone by E-mail Share Federal Energy Management Program: Energy Management Requirements by Subject on Facebook Tweet about Federal...

303

Supervisory Training Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supervisory Training Requirements Supervisory Training Requirements The Office of Learning and Workforce Development has developed an inventory of training and developmental...

304

NERSC/DOE HEP Requirements Workshop Logistics  

NLE Websites -- All DOE Office Websites (Extended Search)

at NERSC HPC Requirements Reviews Requirements for Science: Target 2014 High Energy Physics (HEP) Logistics Workshop Logistics Workshop Location Hilton Washington...

305

National Bridge Inventory Record Data Submission Requirement...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Bridge Inventory Record Data Submission Requirement National Bridge Inventory Record Data Submission Requirement 2011.09.02 OECM-NBI Record Data Submission Req.pdf More...

306

Cold vacuum drying facility design requirements  

SciTech Connect

This document provides the detailed design requirements for the Spent Nuclear Fuel Project Cold Vacuum Drying Facility. Process, safety, and quality assurance requirements and interfaces are specified.

IRWIN, J.J.

1999-07-01T23:59:59.000Z

307

Studying the Communications Requirements of Electric Utilities...  

NLE Websites -- All DOE Office Websites (Extended Search)

Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policies- Public Meeting Studying the Communications Requirements of Electric Utilities...

308

Communications Requirements of Smart Grid Technologies | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

Communications Requirements of Smart Grid Technologies Communications Requirements of Smart Grid Technologies This report sets forth the findings of the U.S. Department of Energy...

309

200 area effluent treatment facility opertaional test report  

Science Conference Proceedings (OSTI)

This document reports the results of the 200 Area Effluent Treatment Facility (200 Area ETF) operational testing activities. These Operational testing activities demonstrated that the functional, operational and design requirements of the 200 Area ETF have been met and identified open items which require retesting.

Crane, A.F.

1995-10-26T23:59:59.000Z

310

Hybrid Electric Vehicle Testing  

NLE Websites -- All DOE Office Websites (Extended Search)

Transportation Association Conference Transportation Association Conference Vancouver, Canada December 2005 Hybrid Electric Vehicle Testing Jim Francfort U.S. Department of Energy - FreedomCAR & Vehicle Technologies Program, Advanced Vehicle Testing Activity INL/CON-05-00964 Presentation Outline * Background & goals * Testing partners * Hybrid electric vehicle testing - Baseline performance testing (new HEV models) - 1.5 million miles of HEV fleet testing (160k miles per vehicle in 36 months) - End-of-life HEV testing (rerun fuel economy & conduct battery testing @ 160k miles per vehicle) - Benchmark data: vehicle & battery performance, fuel economy, maintenance & repairs, & life-cycle costs * WWW information location Background * Advanced Vehicle Testing Activity (AVTA) - part of the

311

Microsoft Word - Requirements 0819.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Studying the ) DOE-HQ-2009-0003-0819 Studying the ) DOE-HQ-2009-0003-0819 Communications Requirements of Electric ) (Noticed May 11, 2010) Utilities to Inform Federal Smart Grid Policy ) ) Comments of San Diego Gas & Electric Company San Diego Gas & Electric Company ("SDG&E") files these comments in response to the above-enumerated Request for Information noticed by the Department on May 11, 2010. SDG&E is a regulated public electric and gas utility operating pursuant to authorities granted to it by the Federal Energy Regulatory Commission and the State of California. SDG&E serves 3.4 million consumers in the San Diego and southern Orange County areas of California via 1.4 million electric meters and 830,000 gas meters. SDG&E's sister company, the Southern California Gas

312

CANMET Gasifier Liner Coupon Material Test Report  

Science Conference Proceedings (OSTI)

This report provides detailed test results consisting of test data and post-test inspections from Task 1 ''Cooled Liner Coupon Development and Test'' of the project titled ''Development of Technologies and Capabilities for Coal Energy Resources--Advanced Gasification Systems Development (AGSD)''. The primary objective of this development and test program is to verify that ceramic matrix composite (CMC) liner materials planned for use in an advanced gasifier pilot plant will successfully withstand the environments in a commercial gasifier. Pratt & Whitney Rocketdyne (PWR) designed and fabricated the cooled liner test assembly article that was tested in a slagging gasifier at CANMET Energy Technology Center (CETC-O) in Ottawa, Ontario, Canada. The test program conducted in 2006 met the objective of operating the cooled liner test article at slagging conditions in a small scale coal gasifier at CETC-O for over the planned 100 hours. The test hardware was exposed to at least 30 high temperature excursions (including start-up and shut-down cycles) during the test program. The results of the testing has provided valuable information on gasifier startup and required cooling controls in steady state operation of future advanced gasifiers using similar liners. The test program also provided a significant amount of information in the areas of CMC materials and processing for improved capability in a gasifier environment and insight into CMC liner fabrication that will be essential for near-term advanced gasifier projects.

Mark Fitzsimmons; Dave Grimmett; Bryan McEnerney

2007-01-31T23:59:59.000Z

313

Advanced Thermal Simulator Testing: Thermal Analysis and Test Results  

SciTech Connect

Work at the NASA Marshall Space Flight Center seeks to develop high fidelity, electrically heated thermal simulators that represent fuel elements in a nuclear reactor design to support non-nuclear testing applicable to the potential development of a space nuclear power or propulsion system. Comparison between the fuel pins and thermal simulators is made at the outer fuel clad surface, which corresponds to the outer sheath surface in the thermal simulator. The thermal simulators that are currently being tested correspond to a liquid metal cooled reactor design that could be applied for Lunar surface power. These simulators are designed to meet the geometric and power requirements of a proposed surface power reactor design, accommodate testing of various axial power profiles, and incorporate imbedded instrumentation. This paper reports the results of thermal simulator analysis and testing in a bare element configuration, which does not incorporate active heat removal, and testing in a water-cooled calorimeter designed to mimic the heat removal that would be experienced in a reactor core.

Bragg-Sitton, Shannon M.; Dickens, Ricky; Dixon, David; Reid, Robert; Adams, Mike; Davis, Joe [NASA Marshall Space Flight Center, Nuclear Systems Branch/ER24, MSFC, AL 35812 (United States)

2008-01-21T23:59:59.000Z

314

DOE Testing Reveals Samsung Refrigerator Does Not Meet Energy Star  

NLE Websites -- All DOE Office Websites (Extended Search)

Testing Reveals Samsung Refrigerator Does Not Meet Energy Star Testing Reveals Samsung Refrigerator Does Not Meet Energy Star Requirements DOE Testing Reveals Samsung Refrigerator Does Not Meet Energy Star Requirements March 16, 2010 - 4:28pm Addthis DOE-initiated testing has revealed that a Samsung refrigerator (model RF26VAB), which the company had claimed was Energy Star compliant, consumed more energy than permitted by the Energy Star program. Test results for the Samsung model at issue show that, when tested in accordance with DOE's test procedure, it consumed between 7 and 11.4 percent more energy than the Energy Star requirement. Samsung is no longer manufacturing this model, although it may still be available from some retail outlets. Based on this testing, DOE is referring Samsung Model RF26VAB to the U.S.

315

Valve test program: response to TMI  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) pressurized-water reactor (PWR) safety and relief valve test program was speedily organized to assess valve operability after a pressurizer relief valve malfunctioned at Three Mile Island (TMI). Comprehensive full-scale testing at several facilities validated the basic designs in use today. 2 figures.

Lihach, N.; Bilanin, W.; Carey, J.

1983-05-01T23:59:59.000Z

316

The Turing Test*  

Science Conference Proceedings (OSTI)

Turing's test has been much misunderstood. Recently unpublished material by Turing casts fresh light on his thinking and dispels a number of philosophical myths concerning the Turing test. Properly understood, the Turing test withstands objections that ...

B. Jack Copeland

2000-11-01T23:59:59.000Z

317

ZiaTest  

NLE Websites -- All DOE Office Websites (Extended Search)

Trinity-NERSC8-RFP NERSC-8 Trinity Benchmarks ZiaTest ZiaTest Description This test executes a new proposed standard benchmark method for MPI startup that is intended to...

318

Test | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Test Test Summary Test More Documents & Publications Evaluation Report: OAS-M-12-01 Evaluation Report: OAS-M-11-01 Evaluation Report: OAS-L-13-01...

319

ZiaTest  

NLE Websites -- All DOE Office Websites (Extended Search)

ZiaTest ZiaTest Description This test executes a new proposed standard benchmark method for MPI startup that is intended to provide a realistic assessment of both launch and wireup...

320

Hybrid Electric Vehicle Testing  

NLE Websites -- All DOE Office Websites (Extended Search)

- 1.5 million miles of HEV fleet testing (160k miles per vehicle in 36 months) - End-of-life HEV testing (rerun fuel economy & conduct battery testing @ 160k miles per vehicle) -...

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

NREL: Wind Research - Testing  

NLE Websites -- All DOE Office Websites (Extended Search)

Testing Photo of a large wind turbine blade sticking out of the structural testing laboratory; it is perpendicular to a building at the National Wind Technology Center. A...

322

PNGV battery test manual  

DOE Green Energy (OSTI)

This manual defines a series of tests to characterize aspects of the performance or life cycle behavior of batteries for hybrid electric vehicle applications. Tests are defined based on the Partnership for New Generation Vehicles (PNGV) program goals, although it is anticipated these tests may be generally useful for testing energy storage devices for hybrid electric vehicles. Separate test regimes are defined for laboratory cells, battery modules or full size cells, and complete battery systems. Some tests are common to all three test regimes, while others are not normally applicable to some regimes. The test regimes are treated separately because their corresponding development goals are somewhat different.

NONE

1997-07-01T23:59:59.000Z

323

Robotics Test Facility  

Science Conference Proceedings (OSTI)

... 5000 square foot) high bay, holding most of the test methods; ... to help engineers view robot performance remotely and for recording testing events. ...

2013-05-23T23:59:59.000Z

324

Test Cell Location  

NLE Websites -- All DOE Office Websites (Extended Search)

2012 Fiat 500 Test Cell Location 2WD Vehicle Setup Information Downloadable Dynamometer Database (D 3 )- Test Summary Sheet Vehicle Architecture Conventional Vehicle Dynamometer...

325

Iris Device Qualification Test  

Science Conference Proceedings (OSTI)

... Device Qualification Test (IDQT). July 15, 2013 - Slides from Workshop. Slides that give the detailed technical approach toward the IDQT tests are ...

2013-07-16T23:59:59.000Z

326

Test Cell Location  

NLE Websites -- All DOE Office Websites (Extended Search)

2013 Nissan Altima Test Cell Location 2WD Vehicle Setup Information Downloadable Dynamometer Database (D 3 )- Test Summary Sheet Vehicle Architecture Conventional Vehicle...

327

Energy Storage Testing  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Storage Testing The Advanced Vehicle Testing Activity is tasked by the U.S. Department of Energys Vehicle Technology Program to conduct various types of energy storage...

328

Test Request LTFY-2  

SciTech Connect

This test request defines pre-test data for the irradiation of enriched yttrium-uranium hydride samples in the LITR C-48 facility.

1964-12-01T23:59:59.000Z

329

OMB MPI Tests  

NLE Websites -- All DOE Office Websites (Extended Search)

OMB MPI Tests OMB MPI Tests Description The Ohio MicroBenchmark suite is a collection of independent MPI message passing performance microbenchmarks developed and written at The...

330

PRACTICAL COMBINATORIAL TESTING  

Science Conference Proceedings (OSTI)

... boot-up. The initial test configuration (Figure 14) was drawn from the library of pre-computed sequence tests. Some changes ...

2012-12-13T23:59:59.000Z

331

Test Cell Location  

NLE Websites -- All DOE Office Websites (Extended Search)

Focus Test Cell Location 2WD Vehicle Setup Information Downloadable Dynamometer Database (D 3 )- Test Summary Sheet Vehicle Architecture Conventional Vehicle Dynamometer Input...

332

Test Cell Location  

NLE Websites -- All DOE Office Websites (Extended Search)

Chrysler 300 Test Cell Location 2WD Vehicle Setup Information Downloadable Dynamometer Database (D 3 )- Test Summary Sheet Vehicle Architecture Conventional Vehicle Dynamometer...

333

Test Cell Location  

NLE Websites -- All DOE Office Websites (Extended Search)

Mazda 3 i-Stop Test Cell Location APRF- 4WD Vehicle Setup Information Downloadable Dynamometer Database (D 3 )- Test Summary Sheet Vehicle Architecture Conventional- Start Stop...

334

Why Test Suites  

Science Conference Proceedings (OSTI)

In the marketplace, testing provides a vehicle for exchanging information ... For sellers (eg, manufacturers), testing can help to substantiate claims that ...

2012-11-02T23:59:59.000Z

335

The emergence of requirements networks: the case for requirements inter-dependencies  

Science Conference Proceedings (OSTI)

Do system requirements depend on each other? Or, do system requirements live in an isolated world of their own and act independently by being completely oblivious to the presence of other requirements? Since a singular requirement does ...

Vishwajeet Kulshreshtha; John Boardman; Dinesh Verma

2012-10-01T23:59:59.000Z

336

Advanced Vehicle Testing Activity: Testing Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

Reports NEVAmerica Baseline Performance Testing Summaries A neighborhood electric vehicle (NEV) is defined as a "low-speed vehicle" (LSV) by the National Highway Traffic...

337

NUCLEAR ENGINEERING & RADIOLOG SC BSE Plan Requirements  

E-Print Network (OSTI)

NUCLEAR ENGINEERING & RADIOLOG SC BSE Plan Requirements 1 Campus: UMICH RG = Requirement Group Career: UENG RQ = Requirement Program: LN = Line Plan: 6000BSE RG 6412 NUCLEAR ENGINEERING no exceptions here) RG 6521 NUCLEAR ENGINEERING AND RADIOLOGICAL SCIENCES RESIDENCY, GPA REQUIREMENTS Effective

Shyy, Wei

338

A systematic review of security requirements engineering  

Science Conference Proceedings (OSTI)

One of the most important aspects in the achievement of secure software systems in the software development process is what is known as Security Requirements Engineering. However, very few reviews focus on this theme in a systematic, thorough and unbiased ... Keywords: Requirements engineering, Secure development, Security, Security engineering, Security requirements, Security requirements engineering, Systematic review

Daniel Mellado; Carlos Blanco; Luis E. Sánchez; Eduardo Fernández-Medina

2010-06-01T23:59:59.000Z

339

The Access Almanac: Solar Parking Requirements  

E-Print Network (OSTI)

throughout the city. In California, one solar-coveredcommuters’ electric cars. California requires that, by 2025,

Shoup, Donald

2012-01-01T23:59:59.000Z

340

Experimental electrochemical capacitor test results  

DOE Green Energy (OSTI)

Various electrochemical capacitors (ultracapacitors) are being developed for hybrid vehicles as candidate power assist devices for the fast response engine. The primary functions of the ultracapacitor are to level the dynamic power loads on the primary propulsion device and recover available energy from regenerative breaking during off-peak power periods. Ultracapacitors show promise toward being able to accept high regenerative pulses while exhibiting very high cycle life. This paper will present test data from selected US Department of Energy (DOE) supported ultracapacitor projects designed to meet the fast response engine requirements. Devices containing carbon, conducting polymers, and metal oxide electrode materials in combination with aqueous or organic electrolytes are being supported by the DOE. This paper will present and discuss testing data obtained from recent prototype capacitors supplied by Maxwell Energy Products, Inc., SAFT America, Inc., Federal Fabrics-Fibers and the University of Wisconsin-Madison. Constant-current, constant-power, leakage-current, and self-discharge testing of these various capacitors have been conducted. All devices were cycled between the rated charged voltage and zero volts for the constant-current tests and between the rated charged voltage and half that value for the constant-power tests.

Wright, R.B.; Murphy, T.C.; Kramer, W.E. [Lockheed Martin Idaho Technology Co., Idaho Falls, ID (United States). Idaho National Engineering and Environmental Lab.; Satula, R.A.; Rogers, S.A. [Dept. of Energy, Washington, DC (United States)

1997-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Broadband Over Power Lines (BPL) Simplified Emissions and Immunity Testing  

Science Conference Proceedings (OSTI)

The FCC Report & Order 04-245 calls out procedures for Certification testing of BPL components, which is required of BPL equipment manufacturers in order to sell their products. The test procedures for this Certification testing are contained in EPRI Technical Update 1011663. The FCC Certification testing regime is rather complicated to use for simply validating that the field strength is below the legal limits. A simplified emissions test procedure for field strength was needed for utilities to assure t...

2006-09-26T23:59:59.000Z

342

Defect Prevention and Detection in Software for Automated Test Equipment  

SciTech Connect

Software for automated test equipment can be tedious and monotonous making it just as error-prone as other software. Active defect prevention and detection are also important for test applications. Incomplete or unclear requirements, a cryptic syntax used for some test applications—especially script-based test sets, variability in syntax or structure, and changing requirements are among the problems encountered in one tester. Such problems are common to all software but can be particularly problematic in test equipment software intended to test another product. Each of these issues increases the probability of error injection during test application development. This report describes a test application development tool designed to address these issues and others for a particular piece of test equipment. By addressing these problems in the development environment, the tool has powerful built-in defect prevention and detection capabilities. Regular expressions are widely used in the development tool as a means of formally defining test equipment requirements for the test application and verifying conformance to those requirements. A novel means of using regular expressions to perform range checking was developed. A reduction in rework and increased productivity are the results. These capabilities are described along with lessons learned and their applicability to other test equipment software. The test application development tool, or “application builder”, is known as the PT3800 AM Creation, Revision and Archiving Tool (PACRAT).

E. Bean

2006-11-30T23:59:59.000Z

343

Test profiles for stationary energy storage applications  

Science Conference Proceedings (OSTI)

Evaluation of battery and other energy storage technologies for stationary uses is progressing rapidly toward application-specific testing that uses computer-based data acquisition and control equipment, active electronic loads and power supplies, and customized software, to enable sophisticated test regimes that simulate actual use conditions. These simulated-use tests provide more accurate performance and life evaluations than simple constant resistance or current testing regimes. Some of the tests use stepped constant-power charge and discharge regimes to simulate conditions created by electric utility applications such as frequency regulation and spinning reserve. Other test profiles under development simulate conditions for the energy storage component of Remote Area Power Supplies (RAPS) that include renewable and/or fossil-fueled generators. Various RAPS applications have unique sets of service conditions that require specialized test profiles. However, almost all RAPS tests and many tests that represent other stationary applications need to simulate significant time periods during which storage devices operate at low-to-medium states-of-charge without full recharge. Consideration of these and similar issues in simulated-use test regimes is necessary to effectively predict the responses of the various types of batteries in specific stationary applications. This paper describes existing and evolving stationary applications for energy storage technologies and test regimes that are designed to simulate them. The paper also discusses efforts to develop international testing standards.

Butler, P.C. [Sandia National Labs., Albuquerque, NM (United States); Cole, J.F. [International Lead Zinc Research Organization, Research Triangle Park, NC (United States); Taylor, P.A. [Energetics, Inc., Columbia, MD (United States)

1998-09-01T23:59:59.000Z

344

Testing and Technical Issues Resolution withing IEC 61850  

Science Conference Proceedings (OSTI)

International Electrotechnical Comission (IEC) 61850 defines in detail methods for conformance testing of different devices. However, there is no existing document (except some conference papers) discussing requirements and methods for functional testing of IEC-61850-based devices and systems. The goal of this project is to analyze the requirements and introduce methods for functional testing, as well as to identify any issues related to interoperability between devices from different manufacturers.

2007-12-19T23:59:59.000Z

345

Reactivity Initiated Accident Test Series Test RIA 1-1 Experiment Operating Specification  

SciTech Connect

This document describes the experiment operating specifications for the Reactivity Initiated Accident (RIA) Test RIA 1-1 to be conducted in the Power Burst Facility (PBF) at the Idaho National Engineering Laboratory. The RIA Series I research objectives are to determine fuel failure thresholds, modes and consequences as functions of enthalpy insertion, irradiation history, and fuel design. Coolant conditions of pressure, temperature, and flow rate that are typical of hot-startup conditions in commercial boiling water reactors (BWRs) will be used. The first test in Series I, Test RIA 1-1, will be comprised of four individual rods, each surrounded by a separate flow shroud. Two rods will be preirradiated and two rods will be unirradiated. The specific objectives of the test are to: (1) characterize the response of unirradiated and preirradiated fuel rods during a RIA event conducted at BWR hot-startup conditions and (2) evaluate test instrumentation response during an RIA. The test sequence will begin with steady state power operation to condition the fuel (pellet cracking and relocation) and determine the fuel rod power calibration. The loop will then be cooled down, the test train removed from the in-pile tube, and one of the unirradiated rods will be removed for fission product analysis and replaced with an identical unirradiated rod. The transient fuel rod energy deposition for Test RIA 1-1 will be chosen from the fuel rod response vs. energy deposition data observed in the first three phases of the RIA Scoping Test. It is anticipated that a fuel pellet surface energy deposition of about 1100 J/g will be required to ensure cladding failure of all four rods. The design of the test fuel rods, test assembly, and instrumentation associated with Test RIA 1-1 are described. The experiment conduct for the test is described. The data recording and reduction requirements are provided. The posttest support and the postirradiation examination requirements associated with Test RIA 1-1 are described.

1978-08-01T23:59:59.000Z

346

ROCKY MOUNTAIN OILFIELD TESTING CENTER PROJECT TEST RESULTS  

NLE Websites -- All DOE Office Websites (Extended Search)

06/97DT15 06/97DT15 RMOTC Test Report Rotary Steerable Stabilizer Smith Drilling and Completions 16740 Hardy Street P. 0. Box 60068 Houston, Texas, 77205-0068 281-443-3370 Leo Giangiacorno, Acting Project Manager Rocky Mountain Oilfield Testing Center December 17, 1997 Introduction Directional drilling is more expensive than vertical drilling. This is due to the high maintenance cost of downhole motors and MWD systems required to control hole trajectory. In addition, directional holes have lower penetration rates due to the poor hole cleaning with a non-rotating string. Down time is often spent orienting tool face to obtain the desired trajectory after tile weight is placed on the bit and the reactive torque of the motor is absorbed by the drill string. Holes drilled in this manner often have a tortuous profile compared to holes drilled with a rotary system, increasing the torque

347

Test report for core drilling ignitability testing  

DOE Green Energy (OSTI)

Testing was carried out with the cooperation of Westinghouse Hanford Company and the United States Bureau of Mines at the Pittsburgh Research Center in Pennsylvania under the Memorandum of Agreement 14- 09-0050-3666. Several core drilling equipment items, specifically those which can come in contact with flammable gasses while drilling into some waste tanks, were tested under conditions similar to actual field sampling conditions. Rotary drilling against steel and rock as well as drop testing of several different pieces of equipment in a flammable gas environment were the specific items addressed. The test items completed either caused no ignition of the gas mixture, or, after having hardware changes or drilling parameters modified, produced no ignition in repeat testing.

Witwer, K.S.

1996-08-08T23:59:59.000Z

348

NEVADA TEST SITE WASTE ACCEPTANCE CRITERIA  

Science Conference Proceedings (OSTI)

This document establishes the U. S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive and mixed waste for disposal. Mixed waste generated within the State of Nevada by NNSA/NSO activities is accepted for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the Nevada Test Site Area 3 and Area 5 Radioactive Waste Management Site for storage or disposal.

U.S. DEPARTMENT OF ENERGY, NATIONAL NUCLEAR SECURITY ADMINISTRATION, NEVADA SITE OFFICE

2005-07-01T23:59:59.000Z

349

High-Voltage Direct Current Corona Testing of Transmission Line Hardware and Insulator Assemblies: Development of Test Methodology  

Science Conference Proceedings (OSTI)

When specifying hardware for new high-voltage direct current (HVDC) lines or replacement hardware for existing HVDC lines utilities generally require that the hardware meet specific corona performance requirements.While standards and test methods exist for testing hardware used on HVAC systems, no such material is available for HVDC systems.HVAC tests are sometimes conducted on the hardware and the results obtained are then related to HVDC by utilizing the peak HVAC line to ...

2013-12-20T23:59:59.000Z

350

Final Report - LAW Envelope A and B Glass Formulations Testing in Increase Waste Loading. VSL-06R6900-1  

SciTech Connect

This report describes the results of testing specified by the Test Plan VSL-06R6900-1 Rev 0. The work was performed in compliance with quality assurance requirements specified in the Test Plan. Results required by the Test Plan are reported. The test results and this report have been reviewed for correctness, technical adequacy, completeness, and accuracy.

Kruger, Albert A.; Joseph, I.; Muller, I. S.; Gong, W.; Gan, H.; Pegg, I. L.; Matlack, K. S.

2013-12-03T23:59:59.000Z

351

Final Report - LAW Envelope C Glass Formulation Testing to Increase Waste Loading, VSL-05R5900-1  

SciTech Connect

This report describes the results of testing specified by Test Plan VSL-05R5900-1 Rev.0. The work was performed in compliance with the quality assurance requirements specified in the Test Plan. Results required by the Test Plan are reported. The test results and this report have been reviewed for correctness, technical adequacy, completeness, and accuracy.

Kruger, Albert A.; Pegg, I. L.; Matlack, K. S.; Joseph, I.; Muller, I. S.; Gong, W.

2013-12-03T23:59:59.000Z

352

Interconnection Testing of Distributed Resources: Preprint  

DOE Green Energy (OSTI)

With the publication of IEEE 1547-2003(TM) Standard for Interconnecting Distributed Resources With Electric Power Systems, the electric power industry has a need to develop tests and procedures to verify that interconnection equipment meets 1547 technical requirements. A new standard, IEEE P1547.1(TM), is being written to give detailed tests and procedures for confirming that equipment meets the interconnection requirements. The National Renewable Energy Laboratory has been validating test procedures being developed as part of IEEE P1547.1. As work progresses on the validation of those procedures, information and test reports are passed on to the working group of IEEE P1547.1 for future revisions.

Kroposki, B.; Basso, T.; DeBlasio, R.

2004-02-01T23:59:59.000Z

353

Efficient Test Solutions for Core-based Designs  

E-Print Network (OSTI)

Abstract—A test solution for a complex system requires the design of a test access mechanism (TAM), which is used for the test data transportation, and a test schedule of the test data transportation on the designed TAM. An extensive TAM will lead to lower test-application time at the expense of higher routing costs, compared to a simple TAM with low routing cost but long testing time. It is also possible to reduce the testing time of a testable unit by loading the test vectors in parallel, thus increasing the parallelization of a test. However, such a test-time reduction often leads to higher power consumption, which must be kept under control since exceeding the power budget could damage the system under test. Furthermore, the execution of a test requires resources and concurrent execution of tests may not be possible due to resource or other conflicts. In this paper, we propose an integrated technique for test scheduling, test parallelization, and TAM design, where the test application time and the TAM routing are minimized, while considering test conflicts and power constraints. The main features of our technique are the efficiency in terms of computation time and the flexibility to model the system’s test behavior, as well as the support for the testing of interconnections, unwrapped cores and user-defined logic. We have implemented our approach and made several experiments on benchmarks as well as industrial designs in order to demonstrate that our approach produces high-quality solution at low computational cost. Index Terms—Scan-chain partitioning, system-on-chip (SOC) testing, test access mechanism design, test data transportation, test scheduling, test solutions. I.

Erik Larsson; Klas Arvidsson; Hideo Fujiwara; Zebo Peng; Senior Member

2004-01-01T23:59:59.000Z

354

Test Plan for Composite Hydrogen Getter Materials  

SciTech Connect

The intent of this test plan is to provide details of the Savannah River Technology Center (SRTC) effort to evaluate composite getter materials for eventual use in expanding the wattage limits for transportation of contact-handled transuranic waste (CH-TRU). This effort is funded by the Mixed Waste Focus Area (MWFA) under Technical Task Plan (TTP) SR-1-9-MW-45 and is the result of a competitive process initiated by a MWFA request for proposals. In response to this request, SRTC presented data on several composite getter materials that demonstrated good potential for application in transportation of transuranic wastes. The tests outlined in the SRTC proposal for composite getter materials should demonstrate compliance with functional requirements provided by the MWFA in a Statement of Work (SOW) which accompanied the request for proposals. Completion of Phase 1 testing, as defined in the TTP, should provide sufficient data to determine if composite getters should progress to Phase s 2 and 3. These test results will provide support for future safety reviews as part of the Transuranic Package Transporter-II (TRUPACT-II) certification process to utilize getter technology. This test plan provides details of the test descriptions, test objectives, required measurements, data quality objectives, data analysis, and schedule information relevant to Phase 1 of the TTP. The results of these tests are expected to help identify any potential weaknesses in the use of composite getter for transportation of CH-TRU wastes. Where a potential weakness is identified, this will be addressed as part of Phase 2 of the proposed effort. It is also important to recognize that these tests are focused on the individual composite getter materials and not the engineered system that would eventually be used in a TRUPACT-II. However, these test results will be very helpful in establishing the requirements for the design of a TRUPACT-II getter system that is included as part of the propo sed Phase 3 effort.

Livingston, R.R.

2000-11-09T23:59:59.000Z

355

Solderability test system  

DOE Patents (OSTI)

A new test method to quantify capillary flow solderability on a printed wiring board surface finish. The test is based on solder flow from a pad onto narrow strips or lines. A test procedure and video image analysis technique were developed for conducting the test and evaluating the data. Feasibility tests revealed that the wetted distance was sensitive to the ratio of pad radius to line width (l/r), solder volume, and flux predry time.

Yost, Fred (Cedar Crest, NM); Hosking, Floyd M. (Albuquerque, NM); Jellison, James L. (Albuquerque, NM); Short, Bruce (Beverly, MA); Giversen, Terri (Beverly, MA); Reed, Jimmy R. (Austin, TX)

1998-01-01T23:59:59.000Z

356

Solderability test system  

DOE Patents (OSTI)

A new test method to quantify capillary flow solderability on a printed wiring board surface finish. The test is based on solder flow from a pad onto narrow strips or lines. A test procedure and video image analysis technique were developed for conducting the test and evaluating the data. Feasibility tests revealed that the wetted distance was sensitive to the ratio of pad radius to line width (l/r), solder volume, and flux predry time. 11 figs.

Yost, F.; Hosking, F.M.; Jellison, J.L.; Short, B.; Giversen, T.; Reed, J.R.

1998-10-27T23:59:59.000Z

357

Two ENERGY STAR Products Fail Testing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Two ENERGY STAR Products Fail Testing Two ENERGY STAR Products Fail Testing Two ENERGY STAR Products Fail Testing August 9, 2011 - 4:42pm Addthis DOE testing has identified two additional models of home appliances that do not meet the ENERGY STAR Program's energy efficiency requirements. A refrigerator manufactured by the Perlick Corporation and a room air conditioner manufactured by Electrolux Home Products, Inc. were selected for testing as part of the DOE's ENERGY STAR Verification Testing Pilot Program. DOE testing revealed that Electrolux air conditioner (model FRA256ST2) and Perlick refrigerator (model HP48RO-S), both of which claimed ENERGY STAR ratings, do not meet the ENERGY STAR requirements. Multiple test results for the Electrolux model show that, when tested in accordance with DOE's

358

Building Technologies Office: Current Test Procedure Waivers  

NLE Websites -- All DOE Office Websites (Extended Search)

Test Procedure Waivers Test Procedure Waivers The U.S. Department of Energy's (DOE) regulations for covered products permit a person to seek a waiver, or an interim waiver, from the test procedure requirements for covered appliances and commercial equipment if certain criteria are satisfied. Regulations applicable to test procedure waivers for appliances can be found at 10 CFR 430.27; those applicable to test procedure waivers for commercial equipment are at 10 CFR 431.401. This table lists all waivers to test procedures that DOE has granted and that are still in effect. The links to the notices provide access to the dockets in Regulations.gov, which contain all notices and public comments. For more information, please email: AS_Waiver_Requests@ee.doe.gov The links to the notices provides access to the docket in regulations.gov, which contains all notices and public comments.

359

A Test Calculus Framework applied to network security policies  

E-Print Network (OSTI)

A Test Calculus Framework applied to network security policies Yli`es Falcone1 , Jean'H`eres, France Abstract. We propose a syntax-driven test generation technique to au- tomaticaly derive abstract test cases from a set of requirements expressed in a linear temporal logic. Assuming that an elementary

Paris-Sud XI, Université de

360

Central Receiver Test Facility (CRTF) experiment manual  

DOE Green Energy (OSTI)

The Central Receiver Test Facility is operated by Sandia Laboratories for the US Department of Energy. The CRTF is being used for component and subsystem evaluation within the Solar Thermal Large Power Systems Program. This experiment manual provides users of the CRTF detailed information about: (1) implementation of testing at the CRTF; (2) details of the CRTF capabilities and interfaces, and (3) requirements of experimenters.

Holmes, J. T.; Matthews, L. K.; Seamons, L. O.; Davis, D. B.; King, D. L.

1979-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Part B - Requirements & Funding Information  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

B - Requirements & Funding Information B - Requirements & Funding Information PART B - Requirements & Funding Information .......................................................................................... 2 PART B - Requirements & Funding Information B.1. Purpose This Part of the IA (hereinafter 'Part B') serves as the funding document. It provides specific information on the requirements of the Department of Energy, hereinafter 'the Requesting Agency' sufficient to demonstrate a bona fide need and identifies funds associated with the requirement to allow [insert the name of agency/organization that will provide acquisition services for the Department of Energy], hereinafter 'the Servicing Agency,' to provide acquisition assistance and conduct an interagency acquisition.

362

Selected Guidance & Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Selected Guidance & Requirements Selected Guidance & Requirements Selected Guidance & Requirements This page contains the most requested NEPA guidance and requirement documents and those most often recommended by the Office of NEPA Policy and Compliance. Documents are listed by agency, in reverse chronological order. More extensive collections of documents are available on the individual pages for Guidance and Requirements pages. Requirements - Statutes National Environmental Policy Act of 1969 Environmental Quality Improvement Act of 1970 Clean Air Act, Section 309 Guidance - Council on Environmental Quality NEPA at 19: A Primer on an "Old" Law with Solutions to New Problems 40 Most Asked Questions Concerning CEQ's NEPA Regulations Guidance - Department of Energy DOE, NEPA, and You

363

Coated Fiber Neutron Detector Test  

Science Conference Proceedings (OSTI)

Radiation portal monitors used for interdiction of illicit materials at borders include highly sensitive neutron detection systems. The main reason for having neutron detection capability is to detect fission neutrons from plutonium. The currently deployed radiation portal monitors (RPMs) from Ludlum and Science Applications International Corporation (SAIC) use neutron detectors based upon 3He-filled gas proportional counters, which are the most common large neutron detector. There is a declining supply of 3He in the world, and thus, methods to reduce the use of this gas in RPMs with minimal changes to the current system designs and sensitivity to cargo-borne neutrons are being investigated. Reported here are the results of tests of the 6Li/ZnS(Ag)-coated non-scintillating plastic fibers option. This testing measured the required performance for neutron detection efficiency and gamma ray rejection capabilities of a system manufactured by Innovative American Technology (IAT).

Lintereur, Azaree T.; Ely, James H.; Kouzes, Richard T.; Stromswold, David C.

2009-10-23T23:59:59.000Z

364

CERTS Microgrid Laboratory Test Bed  

Science Conference Proceedings (OSTI)

The objective of the CERTS Microgrid Test Bed project was to enhance the ease of integrating energy sources into a microgrid. The project accomplished this objective by developing and demonstrating three advanced techniques, collectively referred to as the CERTS Microgrid concept, that significantly reduce the level of custom field engineering needed to operate microgrids consisting of generating sources less than 100kW. The techniques comprising the CERTS Microgrid concept are: 1) a method for effecting automatic and seamless transitions between grid-connected and islanded modes of operation, islanding the microgrid's load from a disturbance, thereby maintaining a higher level of service, without impacting the integrity of the utility's electrical power grid; 2) an approach to electrical protection within a limited source microgrid that does not depend on high fault currents; and 3) a method for microgrid control that achieves voltage and frequency stability under islanded conditions without requiring high-speed communications between sources. These techniques were demonstrated at a full-scale test bed built near Columbus, Ohio and operated by American Electric Power. The testing fully confirmed earlier research that had been conducted initially through analytical simulations, then through laboratory emulations,and finally through factory acceptance testing of individual microgrid components. The islanding and resychronization method met all Institute of Electrical and Electronics Engineers Standard 1547 and power quality requirements. The electrical protection system was able to distinguish between normal and faulted operation. The controls were found to be robust under all conditions, including difficult motor starts and high impedance faults. The results from these tests are expected to lead to additional testing of enhancements to the basic techniques at the test bed to improve the business case for microgrid technologies, as well to field demonstrations involving microgrids that involve one or more of the CERTS Microgrid concepts. Future planned microgrid work involves unattended continuous operation of the microgrid for 30 to 60 days to determine how utility faults impact the operation of the microgrid and to gage the power quality and reliability improvements offered by microgrids.

Eto, Joe; Lasseter, Robert; Schenkman, Ben; Stevens, John; Klapp, Dave; Volkommer, Harry; Linton, Ed; Hurtado, Hector; Roy, Jean

2009-06-18T23:59:59.000Z

365

Postirradiation Testing Laboratory (327 Building)  

Science Conference Proceedings (OSTI)

A Standards/Requirements Identification Document (S/RID) is the total list of the Environment, Safety and Health (ES and H) requirements to be implemented by a site, facility, or activity. These requirements are appropriate to the life cycle phase to achieve an adequate level of protection for worker and public health and safety, and the environment during design, construction, operation, decontamination and decommissioning, and environmental restoration. S/RlDs are living documents, to be revised appropriately based on change in the site`s or facility`s mission or configuration, a change in the facility`s life cycle phase, or a change to the applicable standards/requirements. S/RIDs encompass health and safety, environmental, and safety related safeguards and security (S and S) standards/requirements related to the functional areas listed in the US Department of Energy (DOE) Environment, Safety and Health Configuration Guide. The Fluor Daniel Hanford (FDH) Contract S/RID contains standards/requirements, applicable to FDH and FDH subcontractors, necessary for safe operation of Project Hanford Management Contract (PHMC) facilities, that are not the direct responsibility of the facility manager (e.g., a site-wide fire department). Facility S/RIDs contain standards/requirements applicable to a specific facility that are the direct responsibility of the facility manager. S/RlDs are prepared by those responsible for managing the operation of facilities or the conduct of activities that present a potential threat to the health and safety of workers, public, or the environment, including: Hazard Category 1 and 2 nuclear facilities and activities, as defined in DOE 5480.23. Selected Hazard Category 3 nuclear, and Low Hazard non-nuclear facilities and activities, as agreed upon by RL. The Postirradiation Testing Laboratory (PTL) S/RID contains standards/ requirements that are necessary for safe operation of the PTL facility, and other building/areas that are the direct responsibility of the specific facility manager. The specific DOE Orders, regulations, industry codes/standards, guidance documents and good industry practices that serve as the basis for each element/subelement are identified and aligned with each subelement.

Kammenzind, D.E.

1997-05-28T23:59:59.000Z

366

OM Code Requirements For MOVs -- OMN-1 and Appendix III  

SciTech Connect

The purpose or scope of the ASME OM Code is to establish the requirements for pre-service and in-service testing of nuclear power plant components to assess their operational readiness. For MOVs this includes those that perform a specific function in shutting down a reactor to the safe shutdown condition, maintaining the safe shutdown condition, and mitigating the consequences of an accident. This paper will present a brief history of industry and regulatory activities related to MOVs and the development of Code requirements to address weaknesses in earlier versions of the OM Code. The paper will discuss the MOV requirements contained in the 2009 version of ASME OM Code, specifically Mandatory Appendix III and OMN-1, Revision 1.

Kevin G. DeWall

2011-08-01T23:59:59.000Z

367

Detailed Test Information  

NLE Websites -- All DOE Office Websites (Extended Search)

Detailed Test Information Detailed Test Information EPA tests vehicles by running them through a series of driving routines, also called cycles or schedules, that specify vehicle speed for each point in time during the laboratory tests. For 2007 and earlier model year vehicles, only the city and highway schedules were used. Beginning with 2008 models, three additional tests will be used to adjust the city and highway estimates to account for higher speeds, air conditioning use, and colder temperatures. Note: EPA has established testing criteria for electric vehicles and plug-in hybrids that are slightly different than those for conventional vehicles. New Tests City Highway High Speed Air Conditioning Cold Temperature Detailed Comparison EPA Federal Test Procedure (City Schedule): Shows vehicle speed (mph) at each second of test

368

CERTS Microgrid Laboratory Test Bed  

NLE Websites -- All DOE Office Websites (Extended Search)

CERTS Microgrid Laboratory Test Bed CERTS Microgrid Laboratory Test Bed Title CERTS Microgrid Laboratory Test Bed Publication Type Journal Article LBNL Report Number LBNL-3553E Year of Publication 2011 Authors Lasseter, Robert H., Joseph H. Eto, Ben Schenkman, John Stevens, Harry T. Volkommer, David Klapp, Ed Linton, Hector Hurtado, and Joyashree Roy Journal IEEE Transactions on Power Delivery Volume 26 Start Page 325 Issue 1 Date Published 01/2011 Keywords distributed energy resources (der) Abstract CERTS Microgrid concept captures the emerging potential of distributed generation using a system approach. CERTS views generation and associated loads as a subsystem or a "microgrid". The sources can operate in parallel to the grid or can operate in island, providing UPS services. The system can disconnect from the utility during large events (i.e. faults, voltage collapses), but may also intentionally disconnect when the quality of power from the grid falls below certain standards. CERTS Microgrid concepts were demonstrated at a full-scale test bed built near Columbus, Ohio and operated by American Electric Power. The testing fully confirmed earlier research that had been conducted initially through analytical simulations, then through laboratory emulations, and finally through factory acceptance testing of individual microgrid components. The islanding and resynchronization method met all Institute of Electrical and Electronics Engineers Standard 1547 and power quality requirements. The electrical protection system was able to distinguish between normal and faulted operation. The controls were found to be robust under all conditions, including difficult motor starts and high impedance faults. Keywords: CHP, UPS, distributed generation, intentional islanding, inverters, microgrid, CERTS, power vs. frequency droop, voltage droop.

369

STREAMLINED APPROACH FOR ENVIRONMENTAL RESTORATION PLAN FOR CORRECTIVE ACTION UNIT 116: AREA 25 TEST CELL C FACILITYNEVADA TEST SITE, NEVADA  

SciTech Connect

This Streamlined Approach for Environmental Restoration Plan identifies the activities required for the closure of Corrective Action Unit 116, Area 25 Test Cell C Facility. The Test Cell C Facility is located in Area 25 of the Nevada Test Site approximately 25 miles northwest of Mercury, Nevada.

NONE

2006-07-01T23:59:59.000Z

370

Octane number requirements of vehicles at high altitude  

Science Conference Proceedings (OSTI)

Past tests of vehicles show that their octane number requirements decrease with altitude. As a result, gasoline marketers sell lower-octane-number(ON) gasoline in the mountain states and other high-altitude areas. The current ASTM specifications, which allow reduction of gasoline octane of 1.0 to 1.5 ON per thousand feet, are based on CRC test programs run on 1967 to 1972 model vehicles. However, many new vehicles are now equipped with sophisticated electronic engine systems for control of emissions and improvement of performance and fuel economy at all altitudes. Because these new systems could minimize the altitude effect on octane requirement, Amoco Oil tested twelve 1984-1986 model cars and light trucks. The authors found their ON requirements were reduced on average about 0.2 ON per thousand feet on an (R+M)/2 basis (RMON/1,000 feet). The authors expect octane demand on gasoline suppliers in high-altitude areas to increase as these new cars make up a larger part of the vehicle population, and this could raise the cost of gasoline.

Callison, J.C.

1987-01-01T23:59:59.000Z

371

Sandia National Laboratories Electrochemical Storage System Abuse Test Procedure Manual  

DOE Green Energy (OSTI)

The series of tests described in this report are intended to simulate actual use and abuse conditions and internally initiated failures that may be experienced in electrochemical storage systems (ECSS). These tests were derived from Failure Mode and Effect Analysis, user input, and historical abuse testing. The tests are to provide a common framework for various ECSS technologies. The primary purpose of testing is to gather response information to external/internal inputs. Some tests and/or measurements may not be required for some ECSS technologies and designs if it is demonstrated that a test is not applicable, and the measurements yield no useful information.

Unkelhaeuser, Terry; Smallwood David

1999-07-01T23:59:59.000Z

372

Measurement Requirements for Climate Monitoring of Upper-Air Temperature Derived from Reanalysis Data  

Science Conference Proceedings (OSTI)

Using a reanalysis of the climate of the past half century as a model of temperature variations over the next half century, tests of various data collection protocols are made to develop recommendations for observing system requirements for ...

Dian J. Seidel; Melissa Free

2006-03-01T23:59:59.000Z

373

Alternative Fuels Data Center: Biodiesel Sales Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biodiesel Sales Biodiesel Sales Requirements to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Sales Requirements on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Sales Requirements on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Sales Requirements on Google Bookmark Alternative Fuels Data Center: Biodiesel Sales Requirements on Delicious Rank Alternative Fuels Data Center: Biodiesel Sales Requirements on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Sales Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Sales Requirements It is unlawful for any person to sell, offer for sale, assist in the sale of, deliver, or permit to be sold or offered for sale any biodiesel,

374

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A vehicle may not idle at a loading zone, parking or service area, route terminal, or other off-street areas, except for the following situations:

375

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A motor vehicle engine may not operate for more than five consecutive minutes when the vehicle is not in motion, with the following exceptions:

376

Alternative Fuels Data Center: Idle Reduction Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirements to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirements on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirements on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirements on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirements on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirements on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirements Effective May 1, 2014, a driver may not idle his or her motor vehicle for more than five minutes in a 60-minute period. This limit does not apply if

377

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement Diesel vehicles with a gross vehicle weight rating over 10,000 pounds may not idle for more than five minutes in any continuous 60 minute period.

378

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Reduction Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement The owner or operator of a diesel powered vehicle must limit the length of time their vehicle remains idle. The limit is based on the outside

379

Alternative Fuels Data Center: Ethanol Labeling Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol Labeling Ethanol Labeling Requirement to someone by E-mail Share Alternative Fuels Data Center: Ethanol Labeling Requirement on Facebook Tweet about Alternative Fuels Data Center: Ethanol Labeling Requirement on Twitter Bookmark Alternative Fuels Data Center: Ethanol Labeling Requirement on Google Bookmark Alternative Fuels Data Center: Ethanol Labeling Requirement on Delicious Rank Alternative Fuels Data Center: Ethanol Labeling Requirement on Digg Find More places to share Alternative Fuels Data Center: Ethanol Labeling Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol Labeling Requirement Any motor vehicle fuel sold at retail containing more than 1% ethanol or methanol must be labeled according to Connecticut Department of Consumer

380

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement Motor vehicles may not idle unnecessarily for longer than five consecutive minutes during any 60-minute period. This includes heavy-duty diesel

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement Diesel truck or bus engines may not idle for more than 15 consecutive minutes. Exemptions apply to diesel trucks or buses for which the Nevada

382

Alternative Fuels Data Center: Ethanol Labeling Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol Labeling Ethanol Labeling Requirement to someone by E-mail Share Alternative Fuels Data Center: Ethanol Labeling Requirement on Facebook Tweet about Alternative Fuels Data Center: Ethanol Labeling Requirement on Twitter Bookmark Alternative Fuels Data Center: Ethanol Labeling Requirement on Google Bookmark Alternative Fuels Data Center: Ethanol Labeling Requirement on Delicious Rank Alternative Fuels Data Center: Ethanol Labeling Requirement on Digg Find More places to share Alternative Fuels Data Center: Ethanol Labeling Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol Labeling Requirement All gasoline containing 1% or more ethanol by volume offered for sale must be conspicuously identified as "with ethanol" or "containing ethanol."

383

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A person that operates a diesel powered motor vehicle in certain counties and townships may not cause or allow the motor vehicle, when it is not in

384

Alternative Fuels Data Center: Biodiesel Use Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biodiesel Use Biodiesel Use Requirement to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Use Requirement on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Use Requirement on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Use Requirement on Google Bookmark Alternative Fuels Data Center: Biodiesel Use Requirement on Delicious Rank Alternative Fuels Data Center: Biodiesel Use Requirement on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Use Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Use Requirement At least 75% of the Missouri Department of Transportation (MoDOT) vehicles and heavy equipment that use diesel fuel must be fueled with biodiesel

385

Alternative Fuels Data Center: Biofuel Use Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Use Use Requirement to someone by E-mail Share Alternative Fuels Data Center: Biofuel Use Requirement on Facebook Tweet about Alternative Fuels Data Center: Biofuel Use Requirement on Twitter Bookmark Alternative Fuels Data Center: Biofuel Use Requirement on Google Bookmark Alternative Fuels Data Center: Biofuel Use Requirement on Delicious Rank Alternative Fuels Data Center: Biofuel Use Requirement on Digg Find More places to share Alternative Fuels Data Center: Biofuel Use Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biofuel Use Requirement State agencies must take all reasonable actions to develop the infrastructure necessary to increase the availability and use of E85 and biodiesel throughout the state. Employees using state-owned vehicles are

386

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Reduction Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A commercial vehicle or gasoline powered vehicle may not idle for more than five minutes during any 60-minute period. Exemptions are allowed for the

387

Alternative Fuels Data Center: Biodiesel Warranty Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Warranty Warranty Requirement to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Warranty Requirement on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Warranty Requirement on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Warranty Requirement on Google Bookmark Alternative Fuels Data Center: Biodiesel Warranty Requirement on Delicious Rank Alternative Fuels Data Center: Biodiesel Warranty Requirement on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Warranty Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Warranty Requirement All new state government diesel vehicles must have a manufacturer's warranty that allows the use of biodiesel blends of 20% (B20) in the

388

Alternative Fuels Data Center: Biofuels Blender Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biofuels Blender Biofuels Blender Requirements to someone by E-mail Share Alternative Fuels Data Center: Biofuels Blender Requirements on Facebook Tweet about Alternative Fuels Data Center: Biofuels Blender Requirements on Twitter Bookmark Alternative Fuels Data Center: Biofuels Blender Requirements on Google Bookmark Alternative Fuels Data Center: Biofuels Blender Requirements on Delicious Rank Alternative Fuels Data Center: Biofuels Blender Requirements on Digg Find More places to share Alternative Fuels Data Center: Biofuels Blender Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biofuels Blender Requirements Blenders of ethanol and gasoline and biodiesel and diesel fuels outside of the bulk transfer terminal system must obtain a blender's license and are

389

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A gasoline-fueled motor vehicle is not allowed to operate for more than three consecutive minutes when the vehicle is not in motion, with the

390

Alternative Fuels Data Center: Emissions Control Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Emissions Control Emissions Control Requirement to someone by E-mail Share Alternative Fuels Data Center: Emissions Control Requirement on Facebook Tweet about Alternative Fuels Data Center: Emissions Control Requirement on Twitter Bookmark Alternative Fuels Data Center: Emissions Control Requirement on Google Bookmark Alternative Fuels Data Center: Emissions Control Requirement on Delicious Rank Alternative Fuels Data Center: Emissions Control Requirement on Digg Find More places to share Alternative Fuels Data Center: Emissions Control Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Emissions Control Requirement Heavy-duty diesel vehicles used to perform federally funded state public works contracts must be powered by engines with Level 3 emissions control

391

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A diesel- or gasoline-powered motor vehicle may not idle for more than three consecutive minutes, except under the following conditions: 1) to

392

Alternative Fuels Data Center: Ethanol Labeling Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol Labeling Ethanol Labeling Requirement to someone by E-mail Share Alternative Fuels Data Center: Ethanol Labeling Requirement on Facebook Tweet about Alternative Fuels Data Center: Ethanol Labeling Requirement on Twitter Bookmark Alternative Fuels Data Center: Ethanol Labeling Requirement on Google Bookmark Alternative Fuels Data Center: Ethanol Labeling Requirement on Delicious Rank Alternative Fuels Data Center: Ethanol Labeling Requirement on Digg Find More places to share Alternative Fuels Data Center: Ethanol Labeling Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol Labeling Requirement Motor fuel containing more than 1% ethanol or methanol may not be sold or offered for sale from a motor fuel dispenser unless the individual selling

393

Alternative Fuels Data Center: Biodiesel Use Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biodiesel Use Biodiesel Use Requirement to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Use Requirement on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Use Requirement on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Use Requirement on Google Bookmark Alternative Fuels Data Center: Biodiesel Use Requirement on Delicious Rank Alternative Fuels Data Center: Biodiesel Use Requirement on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Use Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Use Requirement At least 20% of all diesel fuel used to fuel state agency vehicles, vessels, and construction equipment must be biodiesel. The Washington

394

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement Motor vehicles licensed for commercial or public service may not idle for more than three minutes in commercial or residential urban areas, unless

395

Alternative Fuels Data Center: Biodiesel Labeling Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Labeling Labeling Requirement to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Labeling Requirement on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Labeling Requirement on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Labeling Requirement on Google Bookmark Alternative Fuels Data Center: Biodiesel Labeling Requirement on Delicious Rank Alternative Fuels Data Center: Biodiesel Labeling Requirement on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Labeling Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Labeling Requirement Biodiesel fuel retailers may not advertise or offer for sale fuel labeled as pure biodiesel unless the fuel contains no other type of petroleum

396

Science-Driven Network Requirements for ESnet  

E-Print Network (OSTI)

Update to the 2002 Office of Science Networking RequirementsUpdate to the 2002 Office of Science Networking RequirementsUS Dept. of Energy, Office of Science, Advanced Scientific

2006-01-01T23:59:59.000Z

397

Mobile IP Authentication, Authorization, and Accounting Requirements  

Science Conference Proceedings (OSTI)

The Mobile IP and Authentication, Authorization, Accounting (AAA) working groups are currently looking at defining the requirements for Authentication, Authorization, and Accounting. This document contains the requirements which would have to be supported ...

S. Glass; T. Hiller; S. Jacobs; C. Perkins

2000-10-01T23:59:59.000Z

398

Business System Planning Project System Requirements Specification  

SciTech Connect

The purpose of the Business Systems Planning Project System Requirements Specification (SRS) is to provide the outline and contents of the requirements for the CH2M HILL Hanford Group, Inc. (CHG) integrated business and technical information systems. The SRS will translate proposed objectives into the statement of the functions that are to be performed and data and information flows that they require. The requirements gathering methodology will use (1) facilitated group requirement sessions; (2) individual interviews; (3) surveys; and (4) document reviews. The requirements will be verified and validated through coordination of the technical requirement team and CHG Managers. The SRS document used the content and format specified in Lockheed Martin Services, Inc. Organization Standard Software Practices in conjunction with the Institute of Electrical and Electronics Engineers Standard 8340-1984 for Systems Requirements Documents.

NELSON, R.E.

2000-09-08T23:59:59.000Z

399

Science-Driven Network Requirements for ESnet  

E-Print Network (OSTI)

Network Requirements for ESnet Update to the 2002 Office ofNetwork Requirements for ESnet Update to the 2002 Office ofEdited by Eli Dart, ESnet Engineering Staff dart@es.net

2006-01-01T23:59:59.000Z

400

Functions and Requirements for the Transition Project  

SciTech Connect

This document describes the functional requirement baseline for the Transition of 100 K Area Facilities Project (Transition Project). This baseline information consists of top-level functions, requirements, concept description, interface description, issues, and enabling assumptions.

YANOCHKO, R.M.

2000-04-24T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Salt Lake City- High Performance Buildings Requirement  

Energy.gov (U.S. Department of Energy (DOE))

Salt Lake City's mayor issued an executive order in July 2005 requiring that all public buildings owned and controlled by the city be built or renovated to meet the requirements of LEED "silver"...

402

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement Idling of any unattended vehicle is prohibited in Utah. Violators are subject to a penalty of up to $750 and/or up to 90 days imprisonment.

403

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Reduction Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement On-road heavy-duty motor vehicles with a gross vehicle weight rating of 8,500 pounds or greater may not idle for more than three consecutive

404

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A motor vehicle may not idle for more than five consecutive minutes. This regulation does not apply to: 1) vehicles being serviced, provided that

405

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Reduction Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement Vehicle operators may not idle any commercial diesel vehicle with a gross vehicle weight rating of more than 10,000 pounds for more than 10 minutes

406

Alternative Fuels Data Center: Biodiesel Use Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biodiesel Use Biodiesel Use Requirement to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Use Requirement on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Use Requirement on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Use Requirement on Google Bookmark Alternative Fuels Data Center: Biodiesel Use Requirement on Delicious Rank Alternative Fuels Data Center: Biodiesel Use Requirement on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Use Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Use Requirement All diesel-powered motor vehicles, light trucks, and equipment owned or leased by a state agency must operate using diesel fuel that contains a

407

Alternative Fuels Data Center: Ethanol Blend Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol Blend Ethanol Blend Requirement to someone by E-mail Share Alternative Fuels Data Center: Ethanol Blend Requirement on Facebook Tweet about Alternative Fuels Data Center: Ethanol Blend Requirement on Twitter Bookmark Alternative Fuels Data Center: Ethanol Blend Requirement on Google Bookmark Alternative Fuels Data Center: Ethanol Blend Requirement on Delicious Rank Alternative Fuels Data Center: Ethanol Blend Requirement on Digg Find More places to share Alternative Fuels Data Center: Ethanol Blend Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol Blend Requirement Suppliers that import gasoline for sale in North Carolina must offer fuel that is not pre-blended with fuel alcohol but that is suitable for future

408

Alternative Fuels Data Center: Propane Supplier Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Propane Supplier Propane Supplier Requirements to someone by E-mail Share Alternative Fuels Data Center: Propane Supplier Requirements on Facebook Tweet about Alternative Fuels Data Center: Propane Supplier Requirements on Twitter Bookmark Alternative Fuels Data Center: Propane Supplier Requirements on Google Bookmark Alternative Fuels Data Center: Propane Supplier Requirements on Delicious Rank Alternative Fuels Data Center: Propane Supplier Requirements on Digg Find More places to share Alternative Fuels Data Center: Propane Supplier Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Propane Supplier Requirements A retail supplier may only distribute liquefied petroleum gas (LPG or propane) if the supplier holds a license from the Wisconsin Department of

409

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement School bus operators may not idle a school bus engine for more than three consecutive minutes except under the following conditions: uncontrollable

410

Alternative Fuels Data Center: Biofuels Feedstock Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biofuels Feedstock Biofuels Feedstock Requirements to someone by E-mail Share Alternative Fuels Data Center: Biofuels Feedstock Requirements on Facebook Tweet about Alternative Fuels Data Center: Biofuels Feedstock Requirements on Twitter Bookmark Alternative Fuels Data Center: Biofuels Feedstock Requirements on Google Bookmark Alternative Fuels Data Center: Biofuels Feedstock Requirements on Delicious Rank Alternative Fuels Data Center: Biofuels Feedstock Requirements on Digg Find More places to share Alternative Fuels Data Center: Biofuels Feedstock Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biofuels Feedstock Requirements Renewable fuel production plants operating in Louisiana and deriving ethanol from the distillation of corn must use corn crops harvested in

411

Alternative Fuels Data Center: Biofuels Use Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biofuels Use Biofuels Use Requirement to someone by E-mail Share Alternative Fuels Data Center: Biofuels Use Requirement on Facebook Tweet about Alternative Fuels Data Center: Biofuels Use Requirement on Twitter Bookmark Alternative Fuels Data Center: Biofuels Use Requirement on Google Bookmark Alternative Fuels Data Center: Biofuels Use Requirement on Delicious Rank Alternative Fuels Data Center: Biofuels Use Requirement on Digg Find More places to share Alternative Fuels Data Center: Biofuels Use Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biofuels Use Requirement State-owned diesel-powered vehicles and equipment must use a biodiesel blend that contains at least 2% biodiesel (B2), where available, as long as

412

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Reduction Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A commercial motor vehicle with a gross vehicle weight rating of 10,000 pounds or more may not idle for more than 15 minutes in any 60-minute

413

Alternative Fuels Data Center: Tire Inflation Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Tire Inflation Tire Inflation Requirement to someone by E-mail Share Alternative Fuels Data Center: Tire Inflation Requirement on Facebook Tweet about Alternative Fuels Data Center: Tire Inflation Requirement on Twitter Bookmark Alternative Fuels Data Center: Tire Inflation Requirement on Google Bookmark Alternative Fuels Data Center: Tire Inflation Requirement on Delicious Rank Alternative Fuels Data Center: Tire Inflation Requirement on Digg Find More places to share Alternative Fuels Data Center: Tire Inflation Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Tire Inflation Requirement The California Air Resources Board (ARB) enforces regulations to reduce greenhouse gas emissions from vehicles operating inefficiently with under

414

Alternative Fuels Data Center: Biofuel Use Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biofuel Use Biofuel Use Requirements to someone by E-mail Share Alternative Fuels Data Center: Biofuel Use Requirements on Facebook Tweet about Alternative Fuels Data Center: Biofuel Use Requirements on Twitter Bookmark Alternative Fuels Data Center: Biofuel Use Requirements on Google Bookmark Alternative Fuels Data Center: Biofuel Use Requirements on Delicious Rank Alternative Fuels Data Center: Biofuel Use Requirements on Digg Find More places to share Alternative Fuels Data Center: Biofuel Use Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biofuel Use Requirements To reduce fossil fuel dependence and statewide greenhouse gas emissions, New Jersey state departments, agencies, offices, universities, and colleges

415

Alternative Fuels Data Center: Biodiesel Producer Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biodiesel Producer Biodiesel Producer Requirements to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Producer Requirements on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Producer Requirements on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Producer Requirements on Google Bookmark Alternative Fuels Data Center: Biodiesel Producer Requirements on Delicious Rank Alternative Fuels Data Center: Biodiesel Producer Requirements on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Producer Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Producer Requirements Biodiesel is defined as a fuel that is composed of mono-alkyl esters of long-chain fatty acids derived from plant or animal matter, meets the

416

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A vehicle may not idle for more than five minutes from April through October in cities and counties where the local government has signed a

417

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A driver may not idle a vehicle on a roadway outside a business or residential district when it is practical to stop and park the vehicle. A

418

Initial field testing definition of subsurface sealing and backfilling tests in unsaturated tuff; Yucca Mountain Site Characterization Project  

SciTech Connect

This report contains an initial definition of the field tests proposed for the Yucca Mountain Project repository sealing program. The tests are intended to resolve various performance and emplacement concerns. Examples of concerns to be addressed include achieving selected hydrologic and structural requirements for seals, removing portions of the shaft liner, excavating keyways, emplacing cementitious and earthen seals, reducing the impact of fines on the hydraulic conductivity of fractures, efficient grouting of fracture zones, sealing of exploratory boreholes, and controlling the flow of water by using engineered designs. Ten discrete tests are proposed to address these and other concerns. These tests are divided into two groups: Seal component tests and performance confirmation tests. The seal component tests are thorough small-scale in situ tests, the intermediate-scale borehole seal tests, the fracture grouting tests, the surface backfill tests, and the grouted rock mass tests. The seal system tests are the seepage control tests, the backfill tests, the bulkhead test in the Calico Hills unit, the large-scale shaft seal and shaft fill tests, and the remote borehole sealing tests. The tests are proposed to be performed in six discrete areas, including welded and non-welded environments, primarily located outside the potential repository area. The final selection of sealing tests will depend on the nature of the geologic and hydrologic conditions encountered during the development of the Exploratory Studies Facility and detailed numerical analyses. Tests are likely to be performed both before and after License Application.

Fernandez, J.A. [Sandia National Labs., Albuquerque, NM (United States); Case, J.B.; Tyburski, J.R. [I. T. Corp., Albuquerque, NM (United States)

1993-05-01T23:59:59.000Z

419

Rulemaking Activities to Risk-Inform Requirements in 10 CFR Part 50  

SciTech Connect

This paper presents the status of NRC activities to revise requirements in Title 10 of the Code of Federal Regulations (10 CFR Part 50) to make them more risk-informed. The activities include proposed changes to treatment requirements (requirements such as quality assurance, testing, inspection, documentation that are imposed to add confidence in the capability of structures, systems and components (SSCs) to perform their intended functions) as well as changes to certain technical requirements. The technical requirements under consideration are those relating to combustible gas control and for emergency core cooling systems (including the evaluation models). (authors)

McKenna, Eileen M.; Reed, Timothy A. [U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001 (United States)

2002-07-01T23:59:59.000Z

420

Integrating Security RMF with Requirements Management – J ...  

Science Conference Proceedings (OSTI)

Integrating Security RMF with Requirements Management – J Peeler ... Security controls at “Low” Risk are risk accepted & may not need mitigation. ...

2013-12-13T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

WATER REQUIREMENTS FOR A RADIOCHEMICAL PROCESSING PLANT  

SciTech Connect

A survey of the water requirements is presented for a hypothetical plant to process all the fuel from a 15,000Mwe nuclear economy. For each processing plant, specific requirements must be based on a detailed water survey which includes water quality, process requirements, and in-plant conservation plans. These considerations are discussed and the quantitative requirements are listed. (J.R.D.)

Harrington, F.E.

1962-05-28T23:59:59.000Z

422

Federal Energy Management Program: Energy Management Requirements...  

NLE Websites -- All DOE Office Websites (Extended Search)

requirement and guidance pages include: Sustainable Buildings and Campuses Facility Energy Intensity Reduction New Facility Construction and Major Renovation Pollution...

423

SPECIAL ACQUISITION REQUIREMENTS ? TYPICAL ISSUES ASSOCIATED...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(iii) Approving any contractual documents, to include documents defining requirements, incentive plans, and evaluation criteria (iv) Awarding contracts (v) Administering...

424

SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Requirements...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

system owners, project managers, and other information system development and maintenance professionals with guidance in identifying and planning requirements management...

425

Program Requirements | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Requirements | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our...

426

Civilian Radioactive Waste Management System Requirements Document...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management System Requirements Document More Documents & Publications Transportation, Aging and Disposal Canister System Performance Specification: Revision 1 FY 2007 Total...

427

Reactivity Initiated Accident Test Series Test RIA 1-2 Experiment Operating Specification  

SciTech Connect

This document describes the experiment operating specifications for the Reactivity Initiated Accident (RIA) Test RIA 1-2 to be conducted in the Power Burst Facility (PBF) at the Idaho National Engineering Laboratory. The RIA Series I research objectives are to determine fuel failure thresholds, modes and consequences as functions of enthalpy insertion, irradiation history, and fuel design. Coolant conditions of pressure, temperature, and flow rate that are typical of hot-startup conditions in commercial boiling water reactors {BWRs) will be used. The second test in Series I, Test RIA 1-2, will be comprised of four individual rods, each surrounded by a separate flow shroud. The four rods will be preirradiated. The specific objectives of the test are to: (1) characterize the response of preirradiated fuel rods during a RIA event conducted at BWR hot-startup conditions and (2) evaluate the effect of internal rod pressure on preirradiated fuel rod transient response. The test sequence will begin with steady state power operation to condition the fuel (pellet cracking and relocation) and determine the fuel rod power calibration. The loop will then be cooled down, the test train removed from the in-pile tube, and the cobalt flux wires that are mounted on each flow shroud will be replaced. The transient fuel rod energy deposition for the Test RIA 1-2 rods will be chosen from the fuel rod response vs. energy deposition observed in the first three phases of the RIA Scoping Test and the first test of Series J, Test RIA 1-1. The design of the test fuel rods, test assembly, and instrumentation associated with Test RIA 1-2 are described. The planned experiment conduct for the test is described. The data recording and reduction requirements are provided. The posttest operations support and the postirradiation examination requirements associated with Test RIA 1-2 are described.

1978-07-01T23:59:59.000Z

428

Advanced Vehicle Testing Activity: Oil Bypass Filter Testing...  

NLE Websites -- All DOE Office Websites (Extended Search)

Testing Reports to someone by E-mail Share Advanced Vehicle Testing Activity: Oil Bypass Filter Testing Reports on Facebook Tweet about Advanced Vehicle Testing Activity: Oil...

429

Advanced Vehicle Testing Activity: Urban Electric Vehicle Testing...  

NLE Websites -- All DOE Office Websites (Extended Search)

Testing Reports to someone by E-mail Share Advanced Vehicle Testing Activity: Urban Electric Vehicle Testing Reports on Facebook Tweet about Advanced Vehicle Testing Activity:...

430

Advanced Vehicle Testing Activity: Hybrid Electric Vehicle Testing...  

NLE Websites -- All DOE Office Websites (Extended Search)

Testing Reports to someone by E-mail Share Advanced Vehicle Testing Activity: Hybrid Electric Vehicle Testing Reports on Facebook Tweet about Advanced Vehicle Testing Activity:...

431

Requirements Uncertainty in a Software Product Line  

Science Conference Proceedings (OSTI)

A complex system's requirements almost always remain uncertain late into its software development. In gas turbine engine control systems at Rolls-Royce, for a traditional project (non-product line) typically 50% of requirements will change between Critical ... Keywords: Requirements, Uncertainty, Software Product Lines

Andy J. Nolan; Silvia Abrahao; Paul C. Clements; Andy Pickard

2011-08-01T23:59:59.000Z

432

Advanced Metering Infrastructure (AMI) System Security Requirements  

Science Conference Proceedings (OSTI)

This report identifies key cyber security requirements and suggests basic security approaches for safeguarding the many interfaces of Advanced Metering Infrastructure (AMI) systems. These requirements, which were developed through a clearly defined security assessment procedure, are generic; but they can be used to develop more specific security requirements based on actual configurations and environments.

2009-12-21T23:59:59.000Z

433

Guidelines for Mapping Requirements to Technologies  

Science Conference Proceedings (OSTI)

This report describes in a concise format the IntelliGrid methodology for determining appropriate technologies to meet a given set of system requirements for advanced metering infrastructures (AMI). The process consists of three steps: 1) map technologies to functional areas of AMI, 2) map requirements to components and, therefore, functional areas of AMI, and 3) map individual requirements to technologies.

2008-06-17T23:59:59.000Z

434

ECN Pressure Test  

SciTech Connect

This note describes: the rationale for the test pressure of the inner ECN cryostat vessel, the equipment to be used in this test, the test procedure, the status of the vessel prior to the test, the actual test results, and a schematic diagram of the testing set up and the pressure testing permit. The test, performed in the evening of July 17, 1991, was a major success. Based on a neglible pressure drop indicated on the pressure gages (1/4 psi), the vessel appeared to be structurally sound throughout the duration of the test (approx. 1.5 hrs.). No pressure increases were observed on the indicators looking at the beam tube bellows volumes. There was no indication of bubbles form the soap test on the welds and most of the fittings that were checked. There were some slight deviations in the actual procedure used. The UO filter was removed after the vessel had bled down to about 18 psig in order to speed up that aspect of the test. The rationale was that the higher velocity gas had already passed through at the higher pressures and there was no visible traces of the black uo particles. The rate of 4 psi/10 minutes seemed incredibly slow and often that time was reduced to just over half that rate. The testing personnel was allowed to stay in the pit throughout the duration of the test; this was a slight relaxation of the rules.

Dixon, K.; /Fermilab

1991-07-18T23:59:59.000Z

435

Check for peroxides every 6 months. opened test 1 test 2 test 3  

E-Print Network (OSTI)

Check for peroxides every 6 months. opened test 1 test 2 test 3 date initials Check for peroxides every 6 months. opened test 1 test 2 test 3 date initials Check for peroxides every 6 months. Test strips can be obtained from EH&S, 5-8200 opened test 1 test 2 test 3 date initials Check for peroxides

Manning, Sturt

436

Automatic Test Factoring for Java  

E-Print Network (OSTI)

Test factoring creates fast, focused unit tests from slow system-widetests; each new unit test exercises only a subset of the functionalityexercised by the system test. Augmenting a test suite with factoredunit tests ...

Saff, David

2005-06-08T23:59:59.000Z

437

Beam instrumentation for an ISOL test stand  

SciTech Connect

TRIUMF is constructing a test bed for the first stages of the proposed TISAC accelerated radioactive beam facility. The authors will present the requirements for the diagnostic system for this test stand and describe the design and development work underway. Scintillators, beamstops and a Faraday Cup have been tested using stable, mass analyzed, 12 keV beams of ions from mass 14 to 132. The design of a linear drive, with 10 {micro}m resolution, for scanning wires and slits has begun.

Mackenzie, G.H.; Dombsky, M.; Rawnsley, W.; Stanford, G.; Yin, Y. [TRIUMF, Vancouver, British Columbia (Canada); Novikov, A. [INR, Moscow (Russian Federation)

1995-09-01T23:59:59.000Z

438

Laboratory Proficiency Testing Series  

Science Conference Proceedings (OSTI)

Lab Proficiency Testing (LPP), Aflatoxin, Aflatoxin Test Kit, Peanut Paste and Corn Meal, Biodiesel Feedstock, Cholesterol, Cottonseed, Cottonseed Oil, Edibile Fat, Feed Microscopy, Fish Meal, Fumonisin, Gas Chromatography, Gentically Modified Organism, G

439

Laboratory Proficiency Testing Program  

Science Conference Proceedings (OSTI)

AOCS provides a Laboratory Proficiency Program (LPP). Formerly the Smalley Check Sample Program LPP is a collaborative proficiency testing service for oil and fat related commodities, oilseeds, oilseed meals, and edible fats. Laboratory Proficiency Testing

440

I/O Test  

E-Print Network (OSTI)

IO TEST is intended as a hardware testing and debugging aid for use with the PDP-6 and its associated input multiplexer (analog to digital converter) and output multiplexer (digital to analog converter). While all characters ...

Beeler, Michael

1967-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

A Test Example - CECM  

E-Print Network (OSTI)

May 10, 2000 ... A Test Example. Consider A:=21/6+31/5. The advantage of picking a simple algebraic number for our test is that we can easily precompute the ...

442

Centrifugal contractors for laboratory-scale solvent extraction tests  

SciTech Connect

A 2-cm contactor (minicontactor) was developed and used at Argonne National Laboratory for laboratory-scale testing of solvent extraction flowsheets. This new contactor requires only 1 L of simulated waste feed, which is significantly less than the 10 L required for the 4-cm unit that had previously been used. In addition, the volume requirements for the other aqueous and organic feeds are reduced correspondingly. This paper (1) discusses the design of the minicontactor, (2) describes results from having applied the minicontactor to testing various solvent extraction flowsheets, and (3) compares the minicontactor with the 4-cm contactor as a device for testing solvent extraction flowsheets on a laboratory scale.

Leonard, R.A.; Chamberlain, D.B.; Conner, C.

1995-12-31T23:59:59.000Z

443

Test report for run-in acceptance testing of Project W-151 300 HP mixing pumps  

SciTech Connect

This report documents the results of a performance demonstration and operational checkout of three 300 HP mixer pumps in accordance with WHC-SD-WI51-TS-001 ``Mixer Pump Test Specification for Project W-151`` and Statement of Work 8K520-EMN-95-004 ``Mixer Pump Performance Demonstration at MASF`` in the 400 Area Maintenance and Storage Facility (MASF) building. Testing of the pumps was performed by Fast Flux Test Facility (FFTF) Engineering and funded by the Tank Waste Remediation System (TWRS) Project W-151. Testing began with the first pump on 04-01-95 and ended with the third pump on 11-01-96. Prior to testing, the MASF was modified and prepared to meet the pump testing requirements set forth by the Test Specification and the Statement of Work.

Berglin, B.G.

1998-01-29T23:59:59.000Z

444

Personal Body Armor Testing  

Science Conference Proceedings (OSTI)

Directory of Accredited Laboratories. Personal Body Armor Testing. In 2006, the US Department of Justice (DOJ) National ...

2014-01-03T23:59:59.000Z

445

Cryptographic and Security Testing  

Science Conference Proceedings (OSTI)

Directory of Accredited Laboratories. Cryptographic and Security Testing. ... TX. atsec information security corporation, Austin, TX [200658- 0] VA. ...

2013-12-27T23:59:59.000Z

446

HEALTHCARE INFORMATION TECHNOLOGY TESTING  

Science Conference Proceedings (OSTI)

... test reports created for validation purposes and submitted to the certification body, the ... CHP Certified Health Information Technology Products List ...

2013-11-22T23:59:59.000Z

447

Seattle Asbestos Test Bellevue  

Science Conference Proceedings (OSTI)

Seattle Asbestos Test Bellevue. NVLAP Lab Code: 200876-0. Address and Contact Information: 12727 Northup Way, Suite ...

2013-08-02T23:59:59.000Z

448

Seattle Asbestos Test, LLC  

Science Conference Proceedings (OSTI)

Seattle Asbestos Test, LLC. NVLAP Lab Code: 200768-0. Address and Contact Information: 19701 Scriber Lake Road, Suite ...

2013-08-02T23:59:59.000Z

449

Testing EIA Surveys  

U.S. Energy Information Administration (EIA)

... Interviews Without Debriefings Respondents do not see the questionnaire prior to the interview Structured protocol Test question wording and interpretation ...

450

Retlif Testing Laboratories  

Science Conference Proceedings (OSTI)

... of radio disturbance characteristics of electrical motor-operated and ... and Test Procedures for Airborne Equipment - Section 15 - Magnetic Effect. ...

2014-01-03T23:59:59.000Z

451

Control of Test Conduct  

NLE Websites -- All DOE Office Websites (Extended Search)

2 Revision 1 Effective June 2008 Control of Test Conduct Prepared by Electric Transportation Applications Prepared by: Date: Garrett P....

452

Review of Test Results  

NLE Websites -- All DOE Office Websites (Extended Search)

GAC004 Revision 1 Effective June 2008 Review of Test Results Prepared by Electric Transportation Applications Prepared by: Date: Garrett...

453

Computer Forensics Tool Testing  

Science Conference Proceedings (OSTI)

Computer Forensics Tool Testing (CFTT). Summary: For more information, visit: http://www.cftt.nist.gov/. There is a critical ...

2010-10-05T23:59:59.000Z

454

Combinatorial Test Coverage Measurement  

Science Conference Proceedings (OSTI)

... Statement coverage: This is the simplest of coverage criteria – the percentage of statements exercised by the test set. ...

455

Advance Testing Company Inc.  

Science Conference Proceedings (OSTI)

... Conductivity of Saturated Porous Materials Using a Flexible Wall Permeameter. ... Practice for the Accreditation of Testing Agencies for Unit Masonry. ...

2013-09-27T23:59:59.000Z

456

Guidance & Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidance & Requirements Guidance & Requirements Guidance & Requirements The Office of NEPA Policy and Compliance provides guidance and requirement documents to the NEPA community to ensure that the Department's proposed actions comply with the letter and spirit of the National Environmental Policy Act, and to assist the interested public in reviewing NEPA documents. Guidance Guidance documents from the Council on Environmental Quality, Department of Energy, Environmental Protection Agency, and other federal agencies applicable to NEPA proposed actions. Requirements A collection of statutes, Council on Environmental Quality regulations, Department of Energy regulations, and Executive Orders applicable to NEPA proposed actions. Lessons Learned Quarterly Report A collection of guidance, case studies, analyses, references, litigation

457

SIENA Customer Problem Statement and Requirements  

Science Conference Proceedings (OSTI)

This document describes the problem domain and functional requirements of the SIENA framework. The software requirements and system architecture of SIENA are specified in separate documents (called SIENA Software Requirement Specification and SIENA Software Architecture, respectively). While currently this version of the document describes the problems and captures the requirements within the Analysis domain (concentrating on finite element models), it is our intention to subsequent y expand this document to describe problems and capture requirements from the Design and Manufacturing domains. In addition, SIENA is designed to be extendible to support and integrate elements from the other domains (see SIENA Software Architecture document).

L. Sauer; R. Clay; C. Adams; H. Walther; B. Allan; R. Mariano; C. Poore; B. Whiteside; B. Boughton; J. Dike; E. Hoffman; R. Hogan; C. LeGall

2000-08-01T23:59:59.000Z

458

Matrix, Drug Testing for DOE Security Clearance - September 1, 2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Matrix, Drug Testing for DOE Security Clearance - September 1, 2011 Matrix, Drug Testing for DOE Security Clearance - September 1, 2011 Matrix, Drug Testing for DOE Security Clearance - September 1, 2011 September 1, 2011 The following matrix identifies those individuals required to have a current negative drug test as a prerequisite for being processed for a security clearance The following matrix identifies those individuals required to have a current negative drug test as a prerequisite for being processed for a security clearance. A current test is one taken within 60 calendar days of the individual's SF-86/SF-86C signature date. For those cases where no such form is collected (e.g. reciprocity) the test must have been taken within 60 calendar days of the date of the request for security clearance. Matrix, Drug Testing for DOE security clearance - September 1, 2011

459

Testing hypergraph colorability  

Science Conference Proceedings (OSTI)

We study the problem of testing properties of hypergraphs. The goal of property testing is to distinguish between the case whether a given object has a certain property or is "far away" from the property. We prove that the fundamental problem of l-colorability ... Keywords: hypergraph algorithms, hypergraph coloring, hypergraphs, property testing

Artur Czumaj; Christian Sohler

2005-02-01T23:59:59.000Z

460

Quasi-random testing  

Science Conference Proceedings (OSTI)

Quasi-random sequences, also known as low-discrepancy or low-dispersion sequences, are sequences of points in an n-dimensional unit hypercube. These sequences have the property that points are spread more evenly throughout the cube than random point ... Keywords: adaptive random testing, automated testing, low-discrepancy sequence, quasi-random sequence, random testing

Tsong Yueh Chen; Robert Merkel

2005-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Exposure testing and evaluation of solar utilization materials. Semiannual report, May 1, 1975--October 31, 1975  

DOE Green Energy (OSTI)

The initial efforts of a program of research and experimental testing is described in which the optical performance of materials for use in solar energy utilization devices will be determined before and after exposure to outdoor weathering tests. Materials which are currently in use and others which are being considered or developed for these applications will be characterized and exposed to natural solar radiation. Outdoor testing will be accomplished in Phoenix (Ariz.), Miami (Fla.), and Chicago (Ill.). The results of these tests, primarily the effects of outdoor exposure on optical and physical properties, will be compiled in a handbook, along with cost, availability and other pertinent information. These data are vital to the intelligent selection of solar utilization materials, since a knowledge of the cost performance and lifetime characteristics of candidate materials will greatly assist the design of efficient and reliable solar energy utilization devices. Primary accomplishments include the definition of sample requirements, specification of test samples and test configurations, formulation of acceptance/rejection criteria and contacts with numerous potential materials suppliers.

Gilligan, J.E.; Brzuskiewicz, J.

1975-01-01T23:59:59.000Z

462

SHINE VACUUM PUMP TEST VERIFICATION  

Science Conference Proceedings (OSTI)

Normetex pumps used world-wide for tritium service are no longer available. DOE and other researchers worldwide have spent significant funds characterizing this pump. Identification of alternate pumps is required for performance and compatibility with tritium gas. Many of the pumps that could be used to meet the functional performance requirements (e.g. pressure and flow conditions) of the Normetex pump have features that include the use of polymers or oils and greases that are not directly compatible with tritium service. This study assembles a test system to determine the flow characteristics for candidate alternate pumps. These tests are critical to the movement of tritium through the SHINE Tritium Purification System (TPS). The purpose of the pump testing is two-fold: (1) obtain baseline vacuum pump characteristics for an alternate (i.e. ?Normetex replacement?) pump intended for use in tritium service; and (2) verify that low pressure hydrogen gas can be transported over distances up to 300 feet by the candidate pumps. Flow rates and nominal system pressures have been identified for the SHINE Mo-99 production process Tritium Purification System (TPS). To minimize the line sizes for the transfer of low pressure tritium from the Neutron Driver Accelerator System (NDAS) to the primary processing systems in the TPS, a ?booster? pump has been located near the accelerator in the design. A series of pump tests were performed at various configurations using hydrogen gas (no tritium) to ensure that this concept is practical and maintains adequate flow rates and required pressures. This report summarizes the results of the tests that have been performed using various pump configurations. The current design of the Tritium Purification System requires the ?booster? pump to discharge to or to be backed by another vacuum pump. Since Normetex pumps are no longer manufactured, a commercially available Edwards scroll pump will be used to back the booster pump. In this case the ?booster pump? is an Adixen Molecular Drag Pump (MDP 5011) and the backing pump is an Edwards (nXDS15iC) scroll pump. Various configurations of the two pumps and associated lengths of ? inch tubing (0 feet to 300 feet) were used in combination with hydrogen and nitrogen flow rates ranging from 25-400 standard cubic centimeters per minute (sccm) to determine whether the proposed pump configuration meets the design criteria for SHINE. The results of this study indicate that even under the most severe conditions (300 feet of tubing and 400 sccm flow rate) the Adixen 5011 MDP can serve as a booster pump to transport gases from the accelerator (NDAS) to the TPS. The Target Gas Receiving System pump (Edwards nXDS15iC) located approximately 300 feet from the accelerator can effectively back the Adixen MDP. The molecular drag pump was able to maintain its full rotational speed even when the flow rate was 400 sccm hydrogen or nitrogen and 300 feet of tubing was installed between the drag pump and the Edwards scroll pump. In addition to maintaining adequate rotation, the pressure in the system was maintained below the target pressure of 30 torr for all flow rates, lengths of tubing, and process gases. This configuration is therefore adequate to meet the SHINE design requirements in terms of flow and pressure.

Morgan, G.; Peters, B.

2013-09-30T23:59:59.000Z

463

Hanford Tank Farms Waste Certification Flow Loop Test Plan  

Science Conference Proceedings (OSTI)

A future requirement of Hanford Tank Farm operations will involve transfer of wastes from double shell tanks to the Waste Treatment Plant. As the U.S. Department of Energy contractor for Tank Farm Operations, Washington River Protection Solutions anticipates the need to certify that waste transfers comply with contractual requirements. This test plan describes the approach for evaluating several instruments that have potential to detect the onset of flow stratification and critical suspension velocity. The testing will be conducted in an existing pipe loop in Pacific Northwest National Laboratory’s facility that is being modified to accommodate the testing of instruments over a range of simulated waste properties and flow conditions. The testing phases, test matrix and types of simulants needed and the range of testing conditions required to evaluate the instruments are described

Bamberger, Judith A.; Meyer, Perry A.; Scott, Paul A.; Adkins, Harold E.; Wells, Beric E.; Blanchard, Jeremy; Denslow, Kayte M.; Greenwood, Margaret S.; Morgen, Gerald P.; Burns, Carolyn A.; Bontha, Jagannadha R.

2010-01-01T23:59:59.000Z

464

Independent Testing Laboratories, Inc.  

Science Conference Proceedings (OSTI)

... 1.2: 2001 Self-Ballasted Lamps for General Lighting Services - Performance Requirements. ... [22/S06] ANSI C82.2:2002 Ballast for Fluorescent ...

2013-07-19T23:59:59.000Z

465

Advanced Nuclear Technology: Regulatory Performance Requirements for Safety-Related Instrumentation, Revision 1  

Science Conference Proceedings (OSTI)

This report proposes an acceptable methodology to apply to safety-related instrumentation to demonstrate 95% probability and 95% confidence (95/95) uncertainties in support of the requirements of Nuclear Regulatory Commission Regulatory Guide (RG) 1.105 Revision 3. This methodology should serve as a means to specify testing and analysis requirements to instrumentation manufacturers and suppliers for their use in meeting the RG 1.105 Revision 3 95% probability and 95% confidence requirements. A ...

2013-08-07T23:59:59.000Z

466

Test definitions for the evaluation of infrasound sensors.  

SciTech Connect

Most test methodologies referenced in this Test Definition and Test Procedures were designed by Sandia specifically for geophysical instrumentation evaluation. When appropriate, test instrumentation calibration is traceable to the National Institute for Standards Technology (NIST). The objectives are to evaluate the overall technical performance of the infrasound sensor. The results of these evaluations can be compared to the manufacturer's specifications and any relevant application requirements or specifications.

Kromer, Richard Paul (R.P. Kromer Consulting, Albuquerque, NM); Hart, Darren M.; Harris, James Mark

2007-07-01T23:59:59.000Z

467

Nonlinear dependence of the renormalization scale on test functions  

E-Print Network (OSTI)

Quantum electrodynamics exhibits an informal nonlinear dependence on Lorentz invariant test function properties that determine the renormalization scale, such as Mandelstam variables, contrary to the linear dependence on test functions that is required by the Wightman axioms. A first example of an alternative interacting quantum field formalism that has a comparable weakly nonlinear dependence on Dirac spinor test functions is constructed, using U(1)-gauge connections and U(1)-gauge invariant Dirac spinor test functions.

Morgan, Peter

2013-01-01T23:59:59.000Z

468

Resumption of Transient Testing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Initiatives » Nuclear Facility Operations » Resumption of Initiatives » Nuclear Facility Operations » Resumption of Transient Testing Resumption of Transient Testing April 15, 2013 - 11:11am Addthis Resumption of Transient Testing Capability The Department of Energy (DOE) is proposing to re-establish the capability to conduct transient testing of nuclear fuels. Transient testing involves placing fuel or material into the core of a nuclear reactor and subjecting it to short bursts of intense, high-power radiation. After the experiment is completed, the fuel or material is analyzed to determine the effects of the radiation. The resulting information is then used to guide the development and improvement of advanced nuclear fuel designs, and to validate computer models of fuel and core behavior required for U.S. Nuclear Regulatory Commission (NRC) evaluation of nuclear power reactor

469

Resumption of Transient Testing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Initiatives » Nuclear Facility Operations » Resumption of Initiatives » Nuclear Facility Operations » Resumption of Transient Testing Resumption of Transient Testing April 15, 2013 - 11:11am Addthis Resumption of Transient Testing Capability The Department of Energy (DOE) is proposing to re-establish the capability to conduct transient testing of nuclear fuels. Transient testing involves placing fuel or material into the core of a nuclear reactor and subjecting it to short bursts of intense, high-power radiation. After the experiment is completed, the fuel or material is analyzed to determine the effects of the radiation. The resulting information is then used to guide the development and improvement of advanced nuclear fuel designs, and to validate computer models of fuel and core behavior required for U.S. Nuclear Regulatory Commission (NRC) evaluation of nuclear power reactor

470

Toroidal simulation magnet tests  

SciTech Connect

A number of different schemes for testing superconducting coils in a simulated tokamak environment are analyzed for their merits relative to a set of test criteria. Two of the concepts are examined in more detail: the so-called cluster test scheme, which employs two large background field coils, one on either side of the test coil, and the compact torus, a low-aspect ratio toroidal array of a small number of coils in which all of the coils are essentially test coils. Simulation of the pulsed fields of the tokamak is discussed briefly. (auth)

Walstrom, P.L.; Domm, T.C.

1975-01-01T23:59:59.000Z

471

BARRIER SYSTEM FULL SCALE FIRE TESTING ADDRESSEES  

E-Print Network (OSTI)

All holders of operating licenses for nuclear power reactors, except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel, and fuel facilities licensees. PURPOSE The U.S. Nuclear Regulatory Commission (NRC) is issuing this information notice (IN) to inform addressees of the results of Hemyc electrical raceway fire barrier system (ERFBS) full-scale fire tests. The Hemyc ERFBS did not perform for one hour as designed because shrinkage of the Hemyc ERFBS occurred during the testing. It is expected that recipients will review the information for applicability to their facilities and consider actions as appropriate to avoid similar problems. However, suggestions contained in this information notice are not NRC requirements; therefore, no specific action or written response is required. BACKGROUND The Hemyc ERFBS, manufactured by Promatec, Inc., has been installed at nuclear power plants (NPPs) to protect circuits in accordance with regulatory requirements (Reference 1) and plant-specific commitments. As a result of fire protection inspections, unresolved items (URIs) were opened at some nuclear power stations due to questions raised regarding the fire resistance capability of the Hemyc ERFBS (Reference 2). The Office of Nuclear Reactor Regulation (NRR) performed a review of the Hemyc ERFBS (Reference 3) and requested the NRC’s Office of Nuclear Regulatory Research (RES) to perform confirmatory testing of this ERFBS. RES performed the testing at the Omega Point Laboratories in Elmendorf, Texas. DISCUSSION This information notice describes the results of the investigation of the fire resistance capability of the Hemyc ERFBS (Attachment 1). The NRC performed two ASTM E 119 furnace tests on a number of cable raceway types that are protected by the Hemyc ERFBS (with and without air gaps) in accordance with the Hemyc ERFBS test plan (see ADAMS Accession No. ML043210141 for a preliminary version of the test plan). The test plan provides ML050890089 IN 2005-07

unknown authors

2005-01-01T23:59:59.000Z

472

Nanoparticle toxicity testing  

NLE Websites -- All DOE Office Websites (Extended Search)

Nanoparticle toxicity testing Nanoparticle toxicity testing 1663 Los Alamos science and technology magazine Latest Issue:November 2013 All Issues » submit Nanoparticle toxicity testing Assessing the potential health hazards of nanotechnology March 25, 2013 Robot In the search for more accurate and efficient techniques to evaluate the health hazards of nanoparticles, Los Alamos researchers are developing artificial human tissues and organs to replace animal test subjects. A new approach to toxicity testing under development at Los Alamos uses artificial tissue and artificial organs instead of animal testing Manufactured nanoparticles such as buckyballs and carbon nanotubes, used in products ranging from sunscreens to solar panels, are proliferating so quickly that safety testing for potential health hazards-similar to those

473

Test Cell Location  

NLE Websites -- All DOE Office Websites (Extended Search)

Mazda 3 i-Stop Mazda 3 i-Stop Test Cell Location APRF- 4WD Vehicle Setup Information Downloadable Dynamometer Database (D 3 )- Test Summary Sheet Vehicle Architecture Conventional- Start Stop Vehicle Dynamometer Input Document Date 11/20/2012 Advanced Powertrain Research Facility Test weight [lb] 3250 Vehicle Dynamometer Input Document Date 11/20/2012 Revision Number 1 Advanced Powertrain Research Facility Test weight [lb] Target A [lb] 3250 31.2 Target B [lb/mph] Target C [lb/mph^2] 0.462 0.014 Test Fuel Information - Vehicle equipped with with i-Stop package - Manual Transmission - All tests completed in ECO mode - EPA shift schedule modified based on vehicle shift light activity Revision Number 1 Notes: Fuel type EPA Tier II EEE Gasoline Test Fuel Information - Vehicle equipped with with i-Stop package

474

RMOTC - Testing - Geothermal  

NLE Websites -- All DOE Office Websites (Extended Search)

Geothermal Testing Geothermal Testing Notice: As of July 15th 2013, the Department of Energy announced the intent to sell Naval Petroleum Reserve Number 3 (NPR3). The sale of NPR-3 will also include the sale of all equipment and materials onsite. A decision has been made by the Department of Energy to complete testing at RMOTC by July 1st, 2014. RMOTC will complete testing in the coming year with the currently scheduled testing partners. For more information on the sale of NPR-3 and sale of RMOTC equipment and materials please join our mailing list here. With the existing geologic structure at RMOTC, promising potential exists for Enhanced Geothermal System (EGS) testing. The field also has two reliable water resources for supporting low-temperature geothermal testing.

475

Test Acquisition Guide | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Test Acquisition Guide Test Acquisition Guide Test Acquisition Guide Regulatory requirements for the acquisition process are set forth in the Federal Acquisition Regulation (FAR) and are supplemented in the Department of Energy Acquisition Regulation (DEAR). FAR 1.301 provides for the issuance of additional internal agency guidance, including designations and delegations of authority, assignments of responsibilities, work-flow procedures, and internal reporting requirements. The DOE Acquisition Guide serves this purpose by identifying relevant internal standard operating procedures to be followed by both procurement and program personnel who are involved in various aspects of the acquisition process. The Guide also is intended to be a repository of best practices found throughout the agency

476

Ahab's leg: exploring the issues of communicating semi-formal requirements to the final users  

Science Conference Proceedings (OSTI)

In this paper, we present our experience in using narrative scenarios as a tool to communicate and validate semi-formal requirements with the stakeholders in a large software project. The process of translating the semiformal language of Tropos into ... Keywords: goal-oriented requirements engineering, persona, scenario, user-centred design

Chiara Leonardi; Luca Sabatucci; Angelo Susi; Massimo Zancanaro

2010-06-01T23:59:59.000Z

477

Field Testing: Independent, Accredited Testing and Validation for the Wind Industry (Fact Sheet)  

DOE Green Energy (OSTI)

This fact sheet describes the field testing capabilities at the National Wind Technology Center (NWTC). NREL's specialized facilities and personnel at the NWTC provide the U.S. wind industry with scientific and engineering support that has proven critical to the development of wind energy for U.S. energy needs. The NWTC's specialized field-testing capabilities have evolved over 30 years of continuous support by the U.S. Department of Energy Wind and Hydropower Technologies Program and long standing industry partnerships. The NWTC provides wind industry manufacturers, developers, and operators with turbine and component testing all in one convenient location. Although industry utilizes sophisticated modeling tools to design and optimize turbine configurations, there are always limitations in modeling capabilities, and testing is a necessity to ensure performance and reliability. Designs require validation and testing is the only way to determine if there are flaws. Prototype testing is especially important in capturing manufacturing flaws that might require fleet-wide retrofits. The NWTC works with its industry partners to verify the performance and reliability of wind turbines that range in size from 400 Watts to 3 megawatts. Engineers conduct tests on components and full-scale turbines in laboratory environments and in the field. Test data produced from these tests can be used to validate turbine design codes and simulations that further advance turbine designs.

Not Available

2011-11-01T23:59:59.000Z

478

BENCHMARK TESTING A.1 Benchmark Testing Design  

E-Print Network (OSTI)

­and­bound search module first. * Enter the number of system­suggested terms or `0' to quit ?? 30 --* User supplied search process. * Enter the number of system­suggested terms or `0' to quit ?? 10 --* Notice Processing) and different numbers of search terms. We tested 5 cases each for queries with 1 term, 2 terms, 3

479

COLD TEST LOOP INTEGRATED TEST LOOP RESULTS  

Science Conference Proceedings (OSTI)

A testing facility (Cold Test Loop) was constructed and operated to demonstrate the efficacy of the Accelerated Waste Retrieval (AWR) Project's planned sluicing approach to the remediation of Silos 1 and 2 at the Fernald Environmental Management Project near Cincinnati, Ohio. The two silos contain almost 10,000 tons of radium-bearing low-level waste, which consists primarily of solids of raffinates from processing performed on ores from the Democratic Republic of Congo (commonly referred to as ''Belgium Congo ores'') for the recovery of uranium. These silos are 80 ft in diameter, 36 ft high to the center of the dome, and 26.75 ft to the top of the vertical side walls. The test facility contained two test systems, each designed for a specific purpose. The first system, the Integrated Test Loop (ITL), a near-full-scale plant including the actual equipment to be installed at the Fernald Site, was designed to demonstrate the sluicing operation and confirm the selection of a slurry pump, the optimal sluicing nozzle operation, and the preliminary design material balance. The second system, the Component Test Loop (CTL), was designed to evaluate many of the key individual components of the waste retrieval system over an extended run. The major results of the initial testing performed during July and August 2002 confirmed that the AWR approach to sluicing was feasible. The ITL testing confirmed the following: (1) The selected slurry pump (Hazleton 3-20 type SHW) performed well and is suitable for AWR application. However, the pump's motor should be upgraded to a 200-hp model and be driven by a 150-hp variable-frequency drive (VFD). A 200-hp VFD is not much more expensive and would allow the pump to operate at full speed. (2) The best nozzle performance was achieved by using 15/16-in. nozzles operated alternately. This configuration appeared to most effectively mine the surrogate. (3) The Solartron densitometer, which was tested as an alternative mass flow measurement device, did not operate effectively. Consequently, it is not suitable for application to the AWR process. (4) Initially, the spray ring (operated at approximately 2300 psi) and the nozzles provided by the pump vendor did not perform acceptably. The nozzles were replaced with a more robust model, and the performance was then acceptable. (5) The average solids concentration achieved in the slurry before Bentogrout addition was approximately 16% by weight. The solids concentration of the slurry after Bentogrout addition ranged from 26% to approximately 40%. The slurry pump and ITL system performed well at every concentration. No line plugging or other problems were noted. The results of the CTL runs and later ITL testing are summarized in an appendix to this report.

Abraham, TJ

2003-10-22T23:59:59.000Z

480

NISTIR 7297-A FS-TST 2.0: Forensic Software Testing Support Tools Test Plan, Test Design Specifications, and Test Case Specification  

E-Print Network (OSTI)

imaging tools typically used in forensic investigations. The package includes programs that initialize disk drives, detect changes in disk content, and compare pairs of disks. This Internal Report consists of three parts. This is Part A, Test Plan, Test Design Specifications, and Test Case Specification. It covers the planning, design, and specification of testing of FS-TST 2.0. The setup of disk drives and the testing is to be performed in the Linux environment; however, some tests will require interaction with the MS-DOS operating system. Part B, Test Summary Report, is a companion document. It reports the result of testing the FS-TST 2.0 package according to Part A. Two programs might have had slightly more convenient behavior in erroneous cases, but no anomalies were found in testing. Part C, Code Review Report, is an additional companion document. It covers the planning and specification of reviewing all the source code in the package and reports the results of the code reviews. Nothing was found in the code reviews that should cause invalid results, that is, that should lead to an imaging tool with systematic errors being incorrectly passed as adhering to the assertions. The intended audience for this document should be familiar with the Linux operating system, computer operation, and computer hardware components such as hard drives.

Serban I. Gavrila

2005-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Advanced Technology Vehicle Testing  

DOE Green Energy (OSTI)

The light-duty vehicle transportation sector in the United States depends heavily on imported petroleum as a transportation fuel. The Department of Energy’s Advanced Vehicle Testing Activity (AVTA) is testing advanced technology vehicles to help reduce this dependency, which would contribute to the economic stability and homeland security of the United States. These advanced technology test vehicles include internal combustion engine vehicles operating on 100% hydrogen (H2) and H2CNG (compressed natural gas) blended fuels, hybrid electric vehicles, neighborhood electric vehicles, urban electric vehicles, and electric ground support vehicles. The AVTA tests and evaluates these vehicles with closed track and dynamometer testing methods (baseline performance testing) and accelerated reliability testing methods (accumulating lifecycle vehicle miles and operational knowledge within 1 to 1.5 years), and in normal fleet environments. The Arizona Public Service Alternative Fuel Pilot Plant and H2-fueled vehicles are demonstrating the feasibility of using H2 as a transportation fuel. Hybrid, neighborhood, and urban electric test vehicles are demonstrating successful applications of electric drive vehicles in various fleet missions. The AVTA is also developing electric ground support equipment (GSE) test procedures, and GSE testing will start during the fall of 2003. All of these activities are intended to support U.S. energy independence. The Idaho National Engineering and Environmental Laboratory manages these activities for the AVTA.

James Francfort

2003-11-01T23:59:59.000Z

482

Short Sample Testing Facility for the Superconducting Super Collider: Requirements and Development Status  

E-Print Network (OSTI)

Office of High Energy and Nuclear Physics, High EnergyOffice of High Energy and Nuclear Physics, High Energy

Zbasnik, J.

2011-01-01T23:59:59.000Z

483

Requirements for a Standard Test to Rate the Durability of PV Modules at System Voltage (Presentation)  

DOE Green Energy (OSTI)

Degradation modes in photovoltaic modules under system bias voltage stress are described and classified.

Hacke, P.; Terwilliger, K.; Glick, S.; Kempe, M.; Kurtz, S.; Bennett, I.; Kloos, M.

2011-02-01T23:59:59.000Z

484

NERSC HPC Program Requirements Review Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

Published Reports Published Reports NERSC HPC Program Requirements Review Reports These publications comprise the final reports from the HPC requirements reviews presented to the Department of Energy. Downloads NERSC-PRR-HEP-2017.pdf | Adobe Acrobat PDF file Large Scale Computing and Storage Requirements for High Energy Physics - Target 2017 BER2017FinalJune7.pdf | Adobe Acrobat PDF file Large Scale Computing and Storage Requirements for Biological and Environmental Research - Target 2017 NERSC-ASCR-WorkshopReport.pdf | Adobe Acrobat PDF file Large Scale Computing and Storage Requirements for Advanced Scientific Computing Research NERSC-NP-WorkshopReport.pdf | Adobe Acrobat PDF file Large Scale Computing and Storage Requirements for Nuclear Physics Research NERSC-FES-WorkshopReport.pdf | Adobe Acrobat PDF file

485

Bases for pump pit requirements calculations  

DOE Green Energy (OSTI)

A task team is preparing the Process Requirements for the interarea transfer pump pits at the Defense Waste Process Facility (DWPF). The team is developing requirements to prevent flammable mixtures from forming and requires values to use on the generation of various components such as benzene, hydrogen, and N20. The purpose of this memorandum is to document values to be used and to provide sample calculations using these values. There are no recommendations contained in this document.

Jacobs, R.A.

1992-02-13T23:59:59.000Z

486

Safety of magnetic fusion facilities: Requirements  

SciTech Connect

This Standard identifies safety requirements for magnetic fusion facilities. Safety functions are used to define outcomes that must be achieved to ensure that exposures to radiation, hazardous materials, or other hazards are maintained within acceptable limits. Requirements applicable to magnetic fusion facilities have been derived from Federal law, policy, and other documents. In addition to specific safety requirements, broad direction is given in the form of safety principles that are to be implemented and within which safety can be achieved.

1996-05-01T23:59:59.000Z

487

Testing the efficiency of a tradeable permits market  

E-Print Network (OSTI)

A tradeable permits market is said to be efficient when all affected firms trade permits until their marginal costs equal the market price. Detailed firm-level data are generally required to perform such an efficiency test, ...

Montero, Juan-Pablo

2002-01-01T23:59:59.000Z

488

A Simple Test of the Initialization of Gravity Modes  

Science Conference Proceedings (OSTI)

The initialization schemes of Machenhauer (1977), Baer and Tribbia (1977), and one requiring the initial second time derivatives of gravity modes to be zero are tested by application to a simple differential equation, which partially simulates ...

Bradley A. Ballish

1981-06-01T23:59:59.000Z

489

Core Science Requirement Final Document Page 1 THE CORE SCIENCE REQUIREMENT and  

E-Print Network (OSTI)

Core Science Requirement ­ Final Document ­ Page 1 THE CORE SCIENCE REQUIREMENT and MENDEL SCIENCE EXPERIENCE COURSES Core requirement of 2 semesters of science with laboratory; requirement to be met by the end of the sophomore year Rationale Science literacy is an integral part of the intellectual

Lagalante, Anthony F.

490

Building HVAC Requirements Overview Page 4-1 4 Building HVAC Requirements  

E-Print Network (OSTI)

Building HVAC Requirements ­ Overview Page 4-1 4 Building HVAC Requirements 4.1 Overview 4 conditioning (HVAC) systems. The requirements are presented in this chapter so that it may serve as a single. 2008 Residential Compliance Manual August 2009 #12;Page 4-2 Building HVAC Requirements ­ Overview 4

491

Equipment Certification Requirements | Open Energy Information  

Open Energy Info (EERE)

Equipment Certification Requirements Equipment Certification Requirements Jump to: navigation, search Policies requiring renewable energy equipment to meet certain standards serve to protect consumers from buying inferior equipment. These requirements not only benefit consumers; they also protect the renewable energy industry by making it more difficult for substandard systems to reach the market. [1] Contents 1 Equipment Certification Incentives 2 References Equipment Certification Incentives CSV (rows 1 - 19) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active Canada Oil and Gas Operations Act (Canada) Environmental Regulations Equipment Certification Fees Generating Facility Rate-Making Generation Disclosure Industry Recruitment/Support Safety and Operational Guidelines

492

NBP RFI: Communications Requirements- Honeywell Responses To...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Information (RFI) from the Department of Energy on Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities To Inform Federal...

493

Program Requirements | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Follow this link to skip to the main content Facebook Flickr RSS Twitter YouTube Program Requirements | National Nuclear Security Administration Our Mission Managing the Stockpile...

494

Partnership Requirements: ENERGY STAR Partnership for Commercial...  

NLE Websites -- All DOE Office Websites (Extended Search)

Partnership Requirements: ENERGY STAR Partnership for Commercial & Industrial Service and Product Providers (SPP) Secondary menu About us Press room Contact Us Portfolio Manager...

495

This content requires Flash - Business Cards  

This content requires Flash. To view this content, JavaScript must be enabled, and you need the latest version of the Adobe Flash Player. Download the ...

<