Powered by Deep Web Technologies
Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Integrating Customized Test Requirements with Traditional Requirements in Web Application Testing  

E-Print Network [OSTI]

Integrating Customized Test Requirements with Traditional Requirements in Web Application Testing Existing test suite reduction techniques employed for test- ing web applications have either used-based requirements in relation to test suite reduction for web applications. We investigate the use of usage

Sampath, Sreedevi

2

Integrating Customized Test Requirements with Traditional  

E-Print Network [OSTI]

between QA and Development by Michal Blumenstyk 4. Causes of Failures in Web Applications by Solia Pertet.9) Deployment Users Test Cases Web Application Implementation (v.1.0) User Sessions Replay Tool Test Cases-WEB, July 2006 Sreedevi Sampath . University of Delaware 5/29 Program Coverage-based Test Requirement

Sampath, Sreedevi

3

Gas Test Loop Functional and Technical Requirements  

SciTech Connect (OSTI)

This document defines the technical and functional requirements for a gas test loop (GTL) to be constructed for the purpose of providing a high intensity fast-flux irradiation environment for developers of advanced concept nuclear reactors. This capability is needed to meet fuels and materials testing requirements of the designers of Generation IV (GEN IV) reactors and other programs within the purview of the Advanced Fuel Cycle Initiative (AFCI). Space nuclear power development programs may also benefit by the services the GTL will offer. The overall GTL technical objective is to provide developers with the means for investigating and qualifying fuels and materials needed for advanced reactor concepts. The testing environment includes a fast-flux neutron spectrum of sufficient intensity to perform accelerated irradiation testing. Appropriate irradiation temperature, gaseous environment, test volume, diagnostics, and access and handling features are also needed. This document serves to identify those requirements as well as generic requirements applicable to any system of this kind.

Glen R. Longhurst; Soli T. Khericha; James L. Jones

2004-09-01T23:59:59.000Z

4

Automated Requirements Testing with Abstract Oracles Bernhard K. Aichernig  

E-Print Network [OSTI]

, a mapping between abstract and concrete test data is required. The presented framework focuses on the usage of formal requirements specifications as test ora­ cles for concrete implementations. The approach is based, then the model may serve as a test oracle and specification as well. In Fig­ A A op abstract C C op concrete r r

5

12 System Testing of Product Lines: From Requirements to Test Cases  

E-Print Network [OSTI]

12 System Testing of Product Lines: From Requirements to Test Cases C. Nebut, Y. Le Traon, and J is based on the automation of the generation of application system tests, for any chosen product, from the system requirements of a product line. These PL requirements are modeled using enhanced UML use cases

Paris-Sud XI, Université de

6

On the Strategy and Requirements for Neutronics Testing in ITER  

SciTech Connect (OSTI)

Neutronics testing is among the several types of fusion technology testing scheduled to be performed in ITER. The three ports assigned for testing will test several blanket concepts proposed by the various parties with test blanket modules (TBM) that utilize different breeders and coolants. Nevertheless, neutronics issues to be resolved in ITER-TBM are generic in nature and are important to each TBM type. Dedicated neutronics tests specifically address the accuracy involved in predicting key neutronics parameters such as tritium production rate, TPR, volumetric heating rate, induced activation and decay heat, and radiation damage to the reactor components. In this paper, we address some strategies for performing the neutronics tests. Tritium self-sufficiency cannot be confirmed by testing in ITER, however, the testing can provide valuable information regarding the main parameters needed to assess the feasibility of achieving tritium self-sufficiency. The paper also addresses the operational requirement (i.e. flux and fluence) as well as the geometrical requirement of the test module (i.e. minimum size) in order to have meaningful and useful tests. Measured neutronics data require high spatial resolution. This necessitates that the measured quantity be as flat as possible in the innermost locations inside the test module. This requirement has been confirmed in the present work based on results from two-dimensional calculations. The US and Japan solid breeder test blanket modules are placed inside half a port in ITER. The R-{theta} model used accounts for the presence of the ITER shielding blanket and the surrounding frame of the port.

Youssef, M.Z. [University of California-Los Angeles (United States); Sawan, M.E. [University of Wisconsin-Madison (United States)

2005-05-15T23:59:59.000Z

7

Design requirements for the supercritical water oxidation test bed  

SciTech Connect (OSTI)

This report describes the design requirements for the supercritical water oxidation (SCWO) test bed that will be located at the Idaho National Engineering Laboratory (INEL). The test bed will process a maximum of 50 gph of waste plus the required volume of cooling water. The test bed will evaluate the performance of a number of SCWO reactor designs. The goal of the project is to select a reactor that can be scaled up for use in a full-size waste treatment facility to process US Department of Energy mixed wastes. EG&G Idaho, Inc. will design and construct the SCWO test bed at the Water Reactor Research Test Facility (WRRTF), located in the northern region of the INEL. Private industry partners will develop and provide SCWO reactors to interface with the test bed. A number of reactor designs will be tested, including a transpiring wall, tube, and vessel-type reactor. The initial SCWO reactor evaluated will be a transpiring wall design. This design requirements report identifies parameters needed to proceed with preliminary and final design work for the SCWO test bed. A flow sheet and Process and Instrumentation Diagrams define the overall process and conditions of service and delineate equipment, piping, and instrumentation sizes and configuration Codes and standards that govern the safe engineering and design of systems and guidance that locates and interfaces test bed hardware are provided. Detailed technical requirements are addressed for design of piping, valves, instrumentation and control, vessels, tanks, pumps, electrical systems, and structural steel. The approach for conducting the preliminary and final designs and environmental and quality issues influencing the design are provided.

Svoboda, J.M.; Valentich, D.J.

1994-05-01T23:59:59.000Z

8

Study of fueling requirements for the Engineering Test Reactor  

SciTech Connect (OSTI)

An assessment of the fueling requirement for the TIBER Engineering Test Reactor is studied. The neutral shielding pellet ablation model with the inclusion of the effects of the alpha particles is used for our study. The high electron temperature in a reactor-grade plasma makes pellet penetration very difficult. The launch length has to be very large (several tens of meters) in order to avoid pellet breakage due to the low inertial strength of DT ''ice.'' The minimum repetition rate corresponding to the largest allowable pellet, is found to be about 1 Hz. A brief survey is done on the various operational and conceptual pellet injection schemes for plasma fueling. The underlying conclusion is that an alternative fueling scheme of coaxial compact-toroid plasma gun is very likely needed for effective central fueling of reactor-grade plasmas. 16 refs.

Ho, S.K.; Perkins, L.J.

1987-10-16T23:59:59.000Z

9

Issues and test requirements in radiation shielding of fusion reactors  

SciTech Connect (OSTI)

Radiation shield issues for fusion reactors have been investigated and the experiments and facilities required to resolve the issues have been identified and characterized as part of the FINESSE program. This paper summarizes the recommended approach to fusion shield research and development, provides a summary of the necessary experiments and facilities, and presents the results of technical analyses involved.

Nakagawa, M.; Abdou, M.A.

1986-11-01T23:59:59.000Z

10

Issues and test requirements in radiation shielding of fusion reactors  

SciTech Connect (OSTI)

Radiation shield issues for fusion reactors have been investigated and the experiments and facilities required to resolve the issues have been identified and characterized as part of the FINESSE program. This paper summarizes the recommended approach to fusion shield R and D, provides a summary of the necessary experiments and facilities, and presents the results of technical analyses involved.

Nakagawa, M.; Abdou, M.A.

1986-01-01T23:59:59.000Z

11

Beam Test of the Superstructure Instrumentation Requirements for  

E-Print Network [OSTI]

of the HOM-coupler signals ¯ Measurement of the BPM signals ¯ Measurement of beam orbit and energy #12 procedure "HOM Search". #12;Measurement of the BPM signals 8 Beam Test of the Superstructure Measurement of the BPM signals Beside (?!) the re-entrant cavity BPM (C. Magne), a stripline BPM (DESY

12

Proc. of the ACM Int'l. Symp on Softw. Testing and Analysis, Seattle, WA, August 1994, pages 169184. Selecting Tests and Identifying Test Coverage Requirements for  

E-Print Network [OSTI]

of structural coverage crite­ ria. Our technique partitions an existing test suite into two subsets: testsProc. of the ACM Int'l. Symp on Softw. Testing and Analysis, Seattle, WA, August 1994, pages 169­184. Selecting Tests and Identifying Test Coverage Requirements for Modified Software* Gregg Rothermel and Mary

Rothermel, Gregg

13

Engineering Scaling Requirements for Solid Breeder Blanket Testing  

SciTech Connect (OSTI)

An engineering scaling process is applied to the solid breeder ITER TBM designs in accordance with the testing objectives of validating the design tools and the database, and evaluating blanket performance under prototypical operating conditions. The goal of scaling is to ensure that changes in structural response and performance caused by changes in size and operating conditions do not reduce the usefulness of the tests. Initially, constitutive equations are applied to lay out the basic operating and design parameters that dominate blanket phenomena. The suitability of these similarity criteria for the TBM design is then confirmed by comparing finite element predictions of prototype and scale model responses. The TBM design also takes into account the need to check the codes and data for future design use. Specifically, predictability of tritium production and nuclear heating rates in a complex geometry, tritium release and permeation characteristics under fusion environments belong to this category. We conclude that this engineering scaling design process has maximized the value of ITER testing.

Ying, A.; Sharafat, S.; Youssef, M.; An, J.; Hunt, R.; Rainsberry, P.; Abdou, M. [University of California, Los Angeles (United States)

2005-05-15T23:59:59.000Z

14

Seismic requirements for design of nuclear power plants and nuclear test facilities  

SciTech Connect (OSTI)

This standard establishes engineering requirements for the design of nuclear power plants and nuclear test facilities to accommodate vibratory effects of earthquakes.

Not Available

1985-02-01T23:59:59.000Z

15

Test blanket modules in ITER: An overview on proposed designs and required DEMO-relevant materials  

E-Print Network [OSTI]

Test blanket modules in ITER: An overview on proposed designs and required DEMO-relevant materials, Russian Federation Abstract Within the framework of the ITER Test Blanket Working Group, the ITER Parties have made several proposals for test blanket modules to be tested in ITER from the first day of H

Abdou, Mohamed

16

ANSI/NIST-ITL 1-2011 Requirements and Conformance Test Assertions  

E-Print Network [OSTI]

ANSI/NIST-ITL 1-2011 Requirements and Conformance Test Assertions Christofer J. McGinnis Dylan Yaga Fernando L. Podio NISTIR 7806 #12;NISTIR 7806 ANSI/NIST-ITL 1-2011 Requirements and Conformance Test, by The Department of Homeland Security/US-VISIT Program. Abstract The current version of the ANSI/NIST-ITL standard

17

Preliminary requirements for a Fluoride Salt-Cooled High-Temperature Test Reactor (FHTR)  

SciTech Connect (OSTI)

A Fluoride Salt-Cooled High-Temperature Test Reactor (FHTR) design is being developed at MIT to provide the first demonstration and test of a salt-cooled reactor using high-temperature fuel. The first step is to define the requirements. The top level requirements are (1) provide the confidence that a larger demonstration reactor is warranted and (2) develop the necessary data for a larger-scale reactor. Because requirements will drive the design of the FHTR, a significant effort is being undertaken to define requirements and understand the tradeoffs that will be required for a practical design. The preliminary requirements include specifications for design parameters and necessary tests of major reactor systems. Testing requirements include demonstration of components, systems, and procedures for refueling, instrumentation, salt temperature control to avoid coolant freezing, salt chemistry and volume control, tritium monitoring and control, and in-service inspection. Safety tests include thermal hydraulics, neutronics - including intrinsic core shutdown mechanisms such as Doppler feedback - and decay heat removal systems. Materials and coolant testing includes fuels (including mechanical wear and fatigue) and system corrosion behavior. Preliminary analysis indicates a thermal power output below 30 MW, an initial core using pebble-bed or prismatic-block fuel, peak outlet temperatures of at least 700 deg. C, and use of FLi{sup 7}Be ({sup 7}LiF-BeF{sub 2}) coolant. The option to change-out the reactor core, fuel type, and major components is being investigated. While the FHTR will be used for materials testing, its primary mission is as a reactor system performance test to enable the design and licensing of a FHR demonstration power reactor. (authors)

Massie, M.; Forsberg, C.; Forget, B. [Dept. of Nuclear Science and Engineering, Massachusetts Inst. of Technology, Cambridge, MA 02139 (United States); Hu, L. W. [Nuclear Reactor Laboratory, Massachusetts Inst. of Technology, 77 Massachusetts Avenue, Cambridge, MA 02139 (United States)

2012-07-01T23:59:59.000Z

18

Safety requirements, facility user needs, and reactor concepts for a new Broad Application Test Reactor  

SciTech Connect (OSTI)

This report describes the EG&G Laboratory Directed Research and Development Program (LDRD) Broad Application Test Reactor (BATR) Project that was conducted in fiscal year 1991. The scope of this project was divided into three phases: a project process definition phase, a requirements development phase, and a preconceptual reactor design and evaluation phase. Multidisciplinary teams of experts conducted each phase. This report presents the need for a new test reactor, the project process definition, a set of current and projected regulatory compliance and safety requirements, a set of facility user needs for a broad range of projected testing missions, and descriptions of reactor concepts capable of meeting these requirements. This information can be applied to strategic planning to provide the Department of Energy with management options.

Ryskamp, J.M. [ed.; Liebenthal, J.L.; Denison, A.B.; Fletcher, C.D.

1992-07-01T23:59:59.000Z

19

Safety requirements, facility user needs, and reactor concepts for a new Broad Application Test Reactor  

SciTech Connect (OSTI)

This report describes the EG G Laboratory Directed Research and Development Program (LDRD) Broad Application Test Reactor (BATR) Project that was conducted in fiscal year 1991. The scope of this project was divided into three phases: a project process definition phase, a requirements development phase, and a preconceptual reactor design and evaluation phase. Multidisciplinary teams of experts conducted each phase. This report presents the need for a new test reactor, the project process definition, a set of current and projected regulatory compliance and safety requirements, a set of facility user needs for a broad range of projected testing missions, and descriptions of reactor concepts capable of meeting these requirements. This information can be applied to strategic planning to provide the Department of Energy with management options.

Ryskamp, J.M. (ed.); Liebenthal, J.L.; Denison, A.B.; Fletcher, C.D.

1992-07-01T23:59:59.000Z

20

Lead Coolant Test Facility Technical and Functional Requirements, Conceptual Design, Cost and Construction Schedule  

SciTech Connect (OSTI)

This report presents preliminary technical and functional requirements (T&FR), thermal hydraulic design and cost estimate for a lead coolant test facility. The purpose of this small scale facility is to simulate lead coolant fast reactor (LFR) coolant flow in an open lattice geometry core using seven electrical rods and liquid lead or lead-bismuth eutectic. Based on review of current world lead or lead-bismuth test facilities and research need listed in the Generation IV Roadmap, five broad areas of requirements of basis are identified: Develop and Demonstrate Prototype Lead/Lead-Bismuth Liquid Metal Flow Loop Develop and Demonstrate Feasibility of Submerged Heat Exchanger Develop and Demonstrate Open-lattice Flow in Electrically Heated Core Develop and Demonstrate Chemistry Control Demonstrate Safe Operation and Provision for Future Testing. These five broad areas are divided into twenty-one (21) specific requirements ranging from coolant temperature to design lifetime. An overview of project engineering requirements, design requirements, QA and environmental requirements are also presented. The purpose of this T&FRs is to focus the lead fast reactor community domestically on the requirements for the next unique state of the art test facility. The facility thermal hydraulic design is based on the maximum simulated core power using seven electrical heater rods of 420 kW; average linear heat generation rate of 300 W/cm. The core inlet temperature for liquid lead or Pb/Bi eutectic is 420oC. The design includes approximately seventy-five data measurements such as pressure, temperature, and flow rates. The preliminary estimated cost of construction of the facility is $3.7M. It is also estimated that the facility will require two years to be constructed and ready for operation.

Soli T. Khericha

2006-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Reaching corporate sustainability goals requires new thinking, testing options, and a diverse skill set.  

E-Print Network [OSTI]

1 Reaching corporate sustainability goals requires new thinking, testing options, and a diverse Students from multiple disciplines design an innovative approach to solving a sustainability problem from a triple bottom line perspective. Technical skills are combined with a more comprehensive sustainability

Stuart, Josh

22

Test Requirements and Conceptual Design for a Potassium Test Loop to Support an Advanced Potassium Rankine Cycle Power Conversion Systems  

SciTech Connect (OSTI)

Parameters for continuing the design and specification of an experimental potassium test loop are identified in this report. Design and construction of a potassium test loop is part of the Phase II effort of the project ''Technology Development Program for an Advanced Potassium Rankine Power Conversion System''. This program is supported by the National Aeronautics and Space Administration. Design features for the potassium test loop and its instrumentation system, specific test articles, and engineered barriers for ensuring worker safety and protection of the environment are described along with safety and environmental protection requirements to be used during the design process. Information presented in the first portion of this report formed the basis to initiate the design phase of the program; however, the report is a living document that can be changed as necessary during the design process, reflecting modifications as additional design details are developed. Some portions of the report have parameters identified as ''to be determined'' (TBD), reflecting the early stage of the overall process. In cases where specific design values are presently unknown, the report attempts to document the quantities that remain to be defined in order to complete the design of the potassium test loop and supporting equipment.

Yoder, JR.G.L.

2006-03-08T23:59:59.000Z

23

Technical requirements for the actinide source-term waste test program  

SciTech Connect (OSTI)

This document defines the technical requirements for a test program designed to measure time-dependent concentrations of actinide elements from contact-handled transuranic (CH TRU) waste immersed in brines similar to those found in the underground workings of the Waste Isolation Pilot Plant (WIPP). This test program wig determine the influences of TRU waste constituents on the concentrations of dissolved and suspended actinides relevant to the performance of the WIPP. These influences (which include pH, Eh, complexing agents, sorbent phases, and colloidal particles) can affect solubilities and colloidal mobilization of actinides. The test concept involves fully inundating several TRU waste types with simulated WIPP brines in sealed containers and monitoring the concentrations of actinide species in the leachate as a function of time. The results from this program will be used to test numeric models of actinide concentrations derived from laboratory studies. The model is required for WIPP performance assessment with respect to the Environmental Protection Agency`s 40 CFR Part 191B.

Phillips, M.L.F.; Molecke, M.A.

1993-10-01T23:59:59.000Z

24

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.1.3 Check Upload Integrity  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.1.3 Check Upload Integrity Date. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Initial Release COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.1.3 Check Upload Integrity

Colorado at Boulder, University of

25

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.1.3 Check Upload Integrity  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.1.3 Check Upload Integrity Date. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Initial Release COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.1.3 Check Upload Integrity

Colorado at Boulder, University of

26

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.2.2 Download Data Timing  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.2.2 Download Data Timing Date. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Initial Release COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.2.2 Download Data Timing

Colorado at Boulder, University of

27

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.2.1a Watchdog  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.2.1a Watchdog Date: February 13, 2001 for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1.13 Component Test Results Requirement-0049 February 13, 2001 Center for Astrophysics & Space Astronomy Initial Release COS DCE BOOT FSW v1

Colorado at Boulder, University of

28

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.2.2a Watchdog  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.2.2a Watchdog Date: February 13, 2001 for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1.09 Component Test Results Requirement-0019 February 13, 2001 Center for Astrophysics & Space Astronomy Initial Release COS DCE BOOT FSW v1

Colorado at Boulder, University of

29

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.2.2 Download Data Timing  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.2.2 Download Data Timing Date. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Initial Release COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.2.2 Download Data Timing

Colorado at Boulder, University of

30

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.2.1b Watchdog  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.2.1b Watchdog Date: February 13, 2001 for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1.09 Component Test Results Requirement-0018 February 13, 2001 Center for Astrophysics & Space Astronomy Initial Release COS DCE BOOT FSW v1

Colorado at Boulder, University of

31

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.2.1a Watchdog  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.2.1a Watchdog Date: February 13, 2001 for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1.09 Component Test Results Requirement-0017 February 13, 2001 Center for Astrophysics & Space Astronomy Initial Release COS DCE BOOT FSW v1

Colorado at Boulder, University of

32

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.2.1b Watchdog  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.2.1b Watchdog Date: February 13, 2001 for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1.13 Component Test Results Requirement-0050 February 13, 2001 Center for Astrophysics & Space Astronomy Initial Release COS DCE BOOT FSW v1

Colorado at Boulder, University of

33

New requirements for digital radiographic testing of welds according to ISO standards  

SciTech Connect (OSTI)

Users of EN 14784-2 (general principles for computed radiography with phosphor imaging plates) reported about difficulties to achieve testing class B in weld testing with imaging plates. One of the reasons is the insufficient consideration of the inherent detector unsharpness (u{sub i}) in the minimum requirements. Digital detectors have a higher inherent unsharpness compared to film, which can even exceed the geometrical unsharpness (u{sub g}) of the typical contact technique. In EN 444 and ISO 5579 (general principles for film radiography) u{sub i} is neglected for the calculation of the minimum source-to-object distance (SOD), because it is small compared to the geometric unsharpness (u{sub g}). Considering u{sub i} for digital detectors results in a new equation for SOD (see ISO/FDIS 17636-2). Therefore, the increase in total image unsharpness requires the compensation by a larger SOD to reduce u{sub g}. This contribution discusses the need for change of the SOD for different setups (detectors, focal spots, etc.) and explains the difference in image quality, achieved on basis of the extended equation of ISO/FDIS 17636-2. Furthermore, the detection of image quality indicators depends on the achieved Contrast-to-Noise ratio (CNR) and total image unsharpness. Both of them are essential parameters, which influence the contrast sensitivity. Additionally, new compensation principles (e.g. compensation of missing spatial resolution by enhanced contrast sensitivity) allow to widen the application range of digital detectors for radiographic weld testing.

Zscherpel, U.; Ewert, U.; Jechow, M. [BAM Federal Institute for Materials Research and Testing, D-12200 Berlin (Germany)

2013-01-25T23:59:59.000Z

34

Necessity and Requirements of a Collaborative Effort to Develop a Large Wind Turbine Blade Test Facility in North America  

SciTech Connect (OSTI)

The wind power industry in North America has an immediate need for larger blade test facilities to ensure the survival of the industry. Blade testing is necessary to meet certification and investor requirements and is critical to achieving the reliability and blade life needed for the wind turbine industry to succeed. The U.S. Department of Energy's (DOE's) Wind Program is exploring options for collaborating with government, private, or academic entities in a partnership to build larger blade test facilities in North America capable of testing blades up to at least 70 m in length. The National Renewable Energy Laboratory (NREL) prepared this report for DOE to describe the immediate need to pursue larger blade test facilities in North America, categorize the numerous prospective partners for a North American collaboration, and document the requirements for a North American test facility.

Cotrell, J.; Musial, W.; Hughes, S.

2006-05-01T23:59:59.000Z

35

Correlating Dynamometer Testing to In-Use Fleet Results of Plug-In Hybrid Electric Vehicles  

SciTech Connect (OSTI)

Standard dynamometer test procedures are currently being developed to determine fuel and electrical energy consumption of plug-in hybrid vehicles (PHEV). To define a repeatable test procedure, assumptions were made about how PHEVs will be driven and charged. This study evaluates these assumptions by comparing results of PHEV dynamometer testing following proposed procedures to actual performance of PHEVs operating in the US Department of Energys (DOE) North American PHEV Demonstration fleet. Results show PHEVs in the fleet exhibit a wide range of energy consumption, which is not demonstrated in dynamometer testing. Sources of variation in performance are identified and examined.

John G. Smart; Sera White; Michael Duoba

2009-05-01T23:59:59.000Z

36

Tank Waste Remediation System tank waste pretreatment and vitrification process development testing requirements assessment  

SciTech Connect (OSTI)

A multi-faceted study was initiated in November 1993 to provide assurance that needed testing capabilities, facilities, and support infrastructure (sampling systems, casks, transportation systems, permits, etc.) would be available when needed for process and equipment development to support pretreatment and vitrification facility design and construction schedules. This first major report provides a snapshot of the known testing needs for pretreatment, low-level waste (LLW) and high-level waste (HLW) vitrification, and documents the results of a series of preliminary studies and workshops to define the issues needing resolution by cold or hot testing. Identified in this report are more than 140 Hanford Site tank waste pretreatment and LLW/HLW vitrification technology issues that can only be resolved by testing. The report also broadly characterizes the level of testing needed to resolve each issue. A second report will provide a strategy(ies) for ensuring timely test capability. Later reports will assess the capabilities of existing facilities to support needed testing and will recommend siting of the tests together with needed facility and infrastructure upgrades or additions.

Howden, G.F.

1994-10-24T23:59:59.000Z

37

Functional and operational requirements document : building 1012, Battery and Energy Storage Device Test Facility, Sandia National Laboratories, New Mexico.  

SciTech Connect (OSTI)

This report provides an overview of information, prior studies, and analyses relevant to the development of functional and operational requirements for electrochemical testing of batteries and energy storage devices carried out by Sandia Organization 2546, Advanced Power Sources R&D. Electrochemical operations for this group are scheduled to transition from Sandia Building 894 to a new Building located in Sandia TA-II referred to as Building 1012. This report also provides background on select design considerations and identifies the Safety Goals, Stakeholder Objectives, and Design Objectives required by the Sandia Design Team to develop the Performance Criteria necessary to the design of Building 1012. This document recognizes the Architecture-Engineering (A-E) Team as the primary design entity. Where safety considerations are identified, suggestions are provided to provide context for the corresponding operational requirement(s).

Johns, William H.

2013-11-01T23:59:59.000Z

38

Higher Order Mutation Testing Submitted in fulfilment of the requirements for the  

E-Print Network [OSTI]

and Analysis: MSR for App Stores" (short paper), in Proceedings of the 9th Work- ing Conference on Mining- posium and the 13th European conference on Foundations of software engineer- ing (ESEC/FSE '11), Szeged faults Using Higher Order Mutation Testing", in Proceedings of the 8th International Working Confer- ence

Harman, Mark

39

Steam Reforming, 6-in. Bench-Scale Design and Testing Project -- Technical and Functional Requirements Description  

SciTech Connect (OSTI)

Feasibility studies and technology development work are currently being performed on several processes to treat radioactive liquids and solids currently stored at the Idaho Nuclear Technology and Engineering Center (INTEC), located within the Idaho National Engineering and Environmental Laboratory (INEEL). These studies and development work will be used to select a treatment process for treatment of the radioactive liquids and solids to meet treatment milestones of the Settlement Agreement between the Department of Energy and the State of Idaho. One process under consideration for treating the radioactive liquids and solids, specifically Sodium-Bearing Waste (SBW) and tank heel solids, is fluid bed steam reforming (FBSR). To support both feasibility and development studies a bench-scale FBSR is being designed and constructed. This report presents the technical and functional requirements, experimental objectives, process flow sheets, and equipment specifications for the bench-scale FBSR.

Losinski, Sylvester John; Marshall, Douglas William

2002-08-01T23:59:59.000Z

40

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.2.1.1 Error-Detecting Command Format  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.2.1.1 Error-Detecting Command Format. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Astronomy Initial Release COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.2.1.1 Error

Colorado at Boulder, University of

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.1.5a Code in PROM  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.1.5a Code in PROM Date: February 13 for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1.13 Component Test Results Requirement-0045 February 13, 2001 Center for Astrophysics & Space Astronomy Initial Release COS DCE BOOT FSW v1

Colorado at Boulder, University of

42

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.1.2 Capability to Upload Data  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.1.2 Capability to Upload Data Date. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Initial Release COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.1.2 Capability to Upload

Colorado at Boulder, University of

43

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.1.5c Code in PROM  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.1.5c Code in PROM Date: February 13 for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1.13 Component Test Results Requirement-0047 February 13, 2001 Center for Astrophysics & Space Astronomy Initial Release COS DCE BOOT FSW v1

Colorado at Boulder, University of

44

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.4.2 HST Memory Monitor Commanding  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.4.2 HST Memory Monitor Commanding. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Astronomy Initial Release COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.4.2 HST Memory

Colorado at Boulder, University of

45

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.4.1 HST Memory Monitors in Housekeeping  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.4.1 HST Memory Monitors. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Astronomy Initial Release COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.4.1 HST Memory

Colorado at Boulder, University of

46

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.1.5c Code in PROM  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.1.5c Code in PROM Date: February 13 for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1.09 Component Test Results Requirement-0015 February 13, 2001 Center for Astrophysics & Space Astronomy Initial Release COS DCE BOOT FSW v1

Colorado at Boulder, University of

47

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.2.1 Process Memory Download Commands  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.2.1 Process Memory Download Commands. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Astronomy Initial Release COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.2.1 Process Memory

Colorado at Boulder, University of

48

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.2.2b Command to Disable/Enable Watchdog  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.2.2b Command to Disable. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Astronomy Initial Release COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.2.2b Command

Colorado at Boulder, University of

49

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.2.3.2 Echoes for Command Opcode and Parameters  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.2.3.2 Echoes for Command Opcode. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 & Space Astronomy Initial Release COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.2.3.2 Echoes

Colorado at Boulder, University of

50

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.2.1 Process Memory Download Commands  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.2.1 Process Memory Download Commands. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Astronomy Initial Release COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.2.1 Process Memory

Colorado at Boulder, University of

51

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.3.1 CRC Background Checking on Memory Regions  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.3.1 CRC Background Checking on Memory. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 & Space Astronomy Initial Release COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.3.1 CRC

Colorado at Boulder, University of

52

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.1.1 Process Memory Copy Commands  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.1.1 Process Memory Copy Commands Date. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Astronomy Initial Release COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.1.1 Process Memory

Colorado at Boulder, University of

53

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.1.4 Command to Disable/Enable CRC Checking on Upload  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.1.4 Command to Disable/Enable CRC. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 for Astrophysics & Space Astronomy Initial Release COS DCE BOOT FSW v1.09 Component Test Results Requirement 5

Colorado at Boulder, University of

54

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.2.3.1Housekeeping Response Within One Second  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.2.3.1Housekeeping Response Within One. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 & Space Astronomy Initial Release COS DCE BOOT FSW v1.13 Component Test Results Requirement 5

Colorado at Boulder, University of

55

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.1.5a Performs Requisite Initializations  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.1.5a Performs Requisite. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Astronomy Initial Release COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.1.5a Performs

Colorado at Boulder, University of

56

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.1.2 Capability to Upload Data  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.1.2 Capability to Upload Data Date. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Initial Release COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.1.2 Capability to Upload

Colorado at Boulder, University of

57

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.4.1 HST Memory Monitors in Housekeeping  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.4.1 HST Memory Monitors. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Astronomy Initial Release COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.4.1 HST Memory

Colorado at Boulder, University of

58

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.2.1.1 Error-Detecting Command Format  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.2.1.1 Error-Detecting Command Format. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Astronomy Initial Release COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.2.1.1 Error

Colorado at Boulder, University of

59

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.2.3 Capability to Log Diagnostics  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.2.3 Capability to Log Diagnostics. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Astronomy Initial Release COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.2.3 Capability

Colorado at Boulder, University of

60

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.2.2a Command to Disable/Enable Watchdog  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.2.2a Command to Disable. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Astronomy Initial Release COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.2.2a Command

Colorado at Boulder, University of

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.1.5d Code in PROM  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.1.5d Code in PROM Date: February 13 for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1.09 Component Test Results Requirement-0016 February 13, 2001 Center for Astrophysics & Space Astronomy Initial Release COS DCE BOOT FSW v1

Colorado at Boulder, University of

62

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.1.5d Code in PROM  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.1.5d Code in PROM Date: February 13 for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1.13 Component Test Results Requirement-0048 February 13, 2001 Center for Astrophysics & Space Astronomy Initial Release COS DCE BOOT FSW v1

Colorado at Boulder, University of

63

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.1.5b Code in PROM  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.1.5b Code in PROM Date: February 13 for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1.13 Component Test Results Requirement-0046 February 13, 2001 Center for Astrophysics & Space Astronomy Initial Release COS DCE BOOT FSW v1

Colorado at Boulder, University of

64

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.1.1 Process Memory Copy Commands  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.1.1 Process Memory Copy Commands Date. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Astronomy Initial Release COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.1.1 Process Memory

Colorado at Boulder, University of

65

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.4.2 HST Memory Monitor Commanding  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.4.2 HST Memory Monitor Commanding. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Astronomy Initial Release COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.4.2 HST Memory

Colorado at Boulder, University of

66

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.1.2 Distinguish between Power-Up and Watchdog Resets  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.1.2 Distinguish between Power. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 for Astrophysics & Space Astronomy Initial Release COS DCE BOOT FSW v1.09 Component Test Results Requirement 5

Colorado at Boulder, University of

67

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.2.3.1 Housekeeping Response Within One Second  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.2.3.1 Housekeeping Response Within One. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 & Space Astronomy Initial Release COS DCE BOOT FSW v1.09 Component Test Results Requirement 5

Colorado at Boulder, University of

68

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.1.4 Command to Disable/Enable CRC Checking on Upload  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.1.4 Command to Disable/Enable CRC. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 for Astrophysics & Space Astronomy Initial Release COS DCE BOOT FSW v1.13 Component Test Results Requirement 5

Colorado at Boulder, University of

69

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.3.1 CRC Background Checking on Memory Regions  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.3.1 CRC Background Checking on Memory. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 & Space Astronomy Initial Release COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.3.1 CRC

Colorado at Boulder, University of

70

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.1.4 Memory Initialization on Power-Up Only  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.1.4 Memory Initialization on Power. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 & Space Astronomy Initial Release COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.1.4 Memory

Colorado at Boulder, University of

71

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.2.2b Command to Disable/Enable Watchdog  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.2.2b Command to Disable. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Astronomy Initial Release COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.2.2b Command

Colorado at Boulder, University of

72

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.2.5a HST Error Format  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.2.5a HST Error Format Date: February for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1.13 Component Test Results Requirement-03-0054 February 13, 2001 Center for Astrophysics & Space Astronomy Initial Release COS DCE BOOT FSW

Colorado at Boulder, University of

73

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.1.5b Code in PROM  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.1.5b Code in PROM Date: February 13 for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1.09 Component Test Results Requirement-0014 February 13, 2001 Center for Astrophysics & Space Astronomy Initial Release COS DCE BOOT FSW v1

Colorado at Boulder, University of

74

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.1.2 Distinguish Between Power-up and Watchdog Resets  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.1.2 Distinguish Between Power. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 for Astrophysics & Space Astronomy Initial Release COS DCE BOOT FSW v1.13 Component Test Results Requirement 5

Colorado at Boulder, University of

75

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.2.3 Capability to Log Diagnostics  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.2.3 Capability to Log Diagnostics. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Astronomy Initial Release COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.2.3 Capability

Colorado at Boulder, University of

76

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.1.4 Memory Initialization on Power-Up Only  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.1.4 Memory Initialization on Power. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 & Space Astronomy Initial Release COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.1.4 Memory

Colorado at Boulder, University of

77

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.2.3.2 Echoes for Command Opcode and Parameters  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.2.3.2 Echoes for Command Opcode. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 & Space Astronomy Initial Release COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.2.3.2 Echoes

Colorado at Boulder, University of

78

Appearedin Proc. ACM Software Testing Analysis and Veri cation Symp. TAV3-SIGSOFT89, pp. 179-186, Dec. 1989. 1 Estimating the Number of Test Cases Required to Satisfy the All-du-paths  

E-Print Network [OSTI]

discriminating structural testing crite- ria are based on data ow analysis. Rapps and Weyuker de ne a familyAppearedin Proc. ACM Software Testing Analysis and Veri cation Symp. TAV3-SIGSOFT89, pp. 179-186, Dec. 1989. 1 Estimating the Number of Test Cases Required to Satisfy the All-du-paths Testing

Bieman, James M.

79

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.2.2.1a Command Rate: One Per Second  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.2.2.1a Command Rate: One Per Second. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Astronomy Initial Release COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.2.2.1a Command Rate

Colorado at Boulder, University of

80

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.1.1c Initialize to Boot State After Reset  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.1.1c Initialize to Boot State After. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.1.1c Initialize to Boot State After Reset Size Code Indent No

Colorado at Boulder, University of

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.1.1a Initialize to Boot State After Reset  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.1.1a Initialize to Boot State After. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.1.1a Initialize to Boot State After Reset Size Code Indent No

Colorado at Boulder, University of

82

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.2.4.1 Command to Jump Anywhere in Code  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.2.4.1 Command to Jump Anywhere in Code. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Astronomy Initial Release COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.2.4.1 Command to Jump

Colorado at Boulder, University of

83

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.2.4.1 Command to Jump Anywhere in Code  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.2.4.1 Command to Jump Anywhere in Code. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Astronomy Initial Release COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.2.4.1 Command to Jump

Colorado at Boulder, University of

84

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.1.1d Initialize to Boot State After Reset  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.1.1d Initialize to Boot State After. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.1.1d Initialize to Boot State After Reset Size Code Indent No

Colorado at Boulder, University of

85

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.2.2.1a Command Rate: One Per Second  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.2.2.1a Command Rate: One Per Second. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Astronomy Initial Release COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.2.2.1a Command Rate

Colorado at Boulder, University of

86

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.2.3.3a Counters for All Commands  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.2.3.3a Counters for All Commands Date. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Initial Release COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.2.3.3a Counters for All

Colorado at Boulder, University of

87

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.1.1b Initialize to Boot State After Reset  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.1.1b Initialize to Boot State After. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.1.1b Initialize to Boot State After Reset Size Code Indent No

Colorado at Boulder, University of

88

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.1.3 Commands to Reboot DCE FSW  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.1.3 Commands to Reboot DCE FSW Date. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Initial Release COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.1.3 Commands to Reboot DCE

Colorado at Boulder, University of

89

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.1.3 Commands to Re-boot DCE FSW  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.1.3 Commands to Re-boot DCE FSW Date. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.1.3 Commands to Re-boot DCE FSW Size Code Indent No. Document No. Rev

Colorado at Boulder, University of

90

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.2.3.3a Counter for All Commands  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.2.3.3a Counter for All Commands Date. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Initial Release COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.2.3.3a Counter for All

Colorado at Boulder, University of

91

Engineering Scaling Requirements for Solid Breeder Blanket Testing A. Ying, S. Sharafat, M. Youssef, J. An, R. Hunt, P. Rainsberry, M. Abdou  

E-Print Network [OSTI]

Engineering Scaling Requirements for Solid Breeder Blanket Testing A. Ying, S. Sharafat, M. Youssef@fusion.ucla.edu An engineering scaling process is applied to the solid breeder ITER TBM designs in accordance with the testing objectives of validating the design tools and the database, and evaluating blanket performance under

Abdou, Mohamed

92

Purpose and goals The purpose of FEAT is to carry out the functional evaluation and testing required for upgrades to  

E-Print Network [OSTI]

LAT. 2 Integration refers to testing related to Campus Solutions integration and the control interface documentation · To keep eLAT and Change Control Coordinator informed of the functional testing results areas of the system or to `integration'2 . Responsibilities The FEAT Coordinator is responsible

Sidorov, Nikita

93

Requirements for Defining Utility Drive Cycles: An Exploratory Analysis of Grid Frequency Regulation Data for Establishing Battery Performance Testing Standards  

SciTech Connect (OSTI)

Battery testing procedures are important for understanding battery performance, including degradation over the life of the battery. Standards are important to provide clear rules and uniformity to an industry. The work described in this report addresses the need for standard battery testing procedures that reflect real-world applications of energy storage systems to provide regulation services to grid operators. This work was motivated by the need to develop Vehicle-to-Grid (V2G) testing procedures, or V2G drive cycles. Likewise, the stationary energy storage community is equally interested in standardized testing protocols that reflect real-world grid applications for providing regulation services. As the first of several steps toward standardizing battery testing cycles, this work focused on a statistical analysis of frequency regulation signals from the Pennsylvania-New Jersey-Maryland Interconnect with the goal to identify patterns in the regulation signal that would be representative of the entire signal as a typical regulation data set. Results from an extensive time-series analysis are discussed, and the results are explained from both the statistical and the battery-testing perspectives. The results then are interpreted in the context of defining a small set of V2G drive cycles for standardization, offering some recommendations for the next steps toward standardizing testing protocols.

Hafen, Ryan P.; Vishwanathan, Vilanyur V.; Subbarao, Krishnappa; Kintner-Meyer, Michael CW

2011-10-19T23:59:59.000Z

94

Amino acid nutrition of the red drum (Sciaenops ocellatus): development of an improved test diet and determination of the total sulfur amino acid requirement  

E-Print Network [OSTI]

(1985) also found a significant correlation (r=0. 96) between dietary amino acid requirements and whole-body amino acid composition of channel catfish. However, a lower correlation (r-0. 68) was observed between dietary requirements and amino acid... fed amino acid test diets for six weeks1 Diet Weight gain Feed efficiency Survival designation ('/o of initial weight) (g gain/ g feed) (%%d) PM C G/AA CG RDM R D M/A A 210 c 227 c 68 1116 507 b 0. 40c 0. 41 c 0. 17d 0. 81 a 0. 67...

Moon, Hae Young

2012-06-07T23:59:59.000Z

95

Accelerated Testing Validation  

E-Print Network [OSTI]

the University of California. Accelerated Testing Validationmaterials requires relevant Accelerated Stress Tests (ASTs),

Mukundan, Rangachary

2013-01-01T23:59:59.000Z

96

Accumulation of operational history through emulation test to meet proven technology requirement for newly developed I and C technology  

SciTech Connect (OSTI)

As new advanced digital I and C technology with potential benefits of higher functionality and better cost effectiveness is available in the market, NPP (Nuclear Power Plant) operators are inclined to use the new technology for the construction of new plant and the upgrade of existing plants. However, this new technology poses risks to the NPP operators at the same time. These risks are mainly due to the poor reliability of newly developed technology. KHNP's past experiences with the new equipment shows many cases of reliability problems. And their consequences include unintended plant trips, lowered acceptance of the new digital technology by the plant I and C maintenance crew, and increased licensing burden in answering for questions from the nuclear regulatory body. Considering the fact that the risk of these failures in the nuclear plant operation is far greater than those in other industry, nuclear power plant operators want proven technology for I and C systems. This paper presents an approach for the emulation of operational history through which a newly developed technology becomes a proven technology. One of the essential elements of this approach is the feedback scheme of running the new equipment in emulated environment, gathering equipment failure, and correcting the design(and test bed). The emulation of environment includes normal and abnormal events of the new equipment such as reconfiguration of control system due to power failure, plant operation including full spectrum of credible scenarios in an NPP. Emulation of I and C equipment execution mode includes normal operation, initialization and termination, abnormal operation, hardware maintenance and maintenance of algorithm/software. Plant specific simulator is used to create complete profile of plant operational conditions that I and C equipment is to experience in the real plant. Virtual operating crew technology is developed to run the simulator scenarios without involvement of actual operators at the emulated environment. Verification and validation are performed for detecting problems of the new technology. Verification of the equipment is done in two ways, one is to evaluate the features of the equipment according to the criteria derived from good practices of well proven I and C products and the second is to evaluate the features of the equipment by I and C experts. Validations are done in two ways, one is to validate the functions and performance of the equipment and the other is to validate the robustness of the equipment by accumulation operational experience. (authors)

Yeong Cheol, Shin; Sung Kon, Kang [Nuclear Environment Technology Institute (NETEC), Korea Hydro and Nuclear Power(KHNP) P.O. Box Youseong-gu Daejeon (Korea, Republic of); Han Seong, Son [ENESYS Co., Ltd. 3F, Pianetta Bldg., 337-2, Jangdae-dong, Yuseong-gu, Daejeon (Korea, Republic of)

2006-07-01T23:59:59.000Z

97

Idaho National Laboratory Lead or Lead-Bismuth Eutectic (LBE) Test Facility - R&D Requirements, Design Criteria, Design Concept, and Concept Guidance  

SciTech Connect (OSTI)

The Idaho National Laboratory Lead-Bismuth Eutectic Test Facility will advance the state of nuclear technology relative to heavy-metal coolants (primarily Pb and Pb-Bi), thereby allowing the U.S. to maintain the pre-eminent position in overseas markets and a future domestic market. The end results will be a better qualitative understanding and quantitative measure of the thermal physics and chemistry conditions in the molten metal systems for varied flow conditions (single and multiphase), flow regime transitions, heat input methods, pumping requirements for varied conditions and geometries, and corrosion performance. Furthering INL knowledge in these areas is crucial to sustaining a competitive global position. This fundamental heavy-metal research supports the National Energy Policy Development Groups stated need for energy systems to support electrical generation.1 The project will also assist the Department of Energy in achieving goals outlined in the Nuclear Energy Research Advisory Committee Long Term Nuclear Technology Research and Development Plan,2 the Generation IV Roadmap for Lead Fast Reactor development, and Advanced Fuel Cycle Initiative research and development. This multi-unit Lead-Bismuth Eutectic Test Facility with its flexible and reconfigurable apparatus will maintain and extend the U.S. nuclear knowledge base, while educating young scientists and engineers. The uniqueness of the Lead-Bismuth Eutectic Test Facility is its integrated Pool Unit and Storage Unit. This combination will support large-scale investigation of structural and fuel cladding material compatibility issues with heavy-metal coolants, oxygen chemistry control, and thermal hydraulic physics properties. Its ability to reconfigure flow conditions and piping configurations to more accurately approximate prototypical reactor designs will provide a key resource for Lead Fast Reactor research and development. The other principal elements of the Lead-Bismuth Eutectic Test Facility (in addition to the Pool Unit and Storage Unit) are the Bench Scale Unit and Supporting Systems, principal of which are the O2 Sensor/Calibration System, Feed System, Transfer System, Off- Gas System, Purge and Evacuation System, Oxygen Sensor and Control System, Data Acquisition and Control System, and the Safety Systems. Parallel and/or independent corrosion studies and convective heat transfer experiments for cylindrical and annular geometries will support investigation of heat transfer phenomena into the secondary side. In addition, molten metal pumping concepts and power requirements will be measured for future design use.

Eric P. Loewen; Paul Demkowicz

2005-05-01T23:59:59.000Z

98

NISTIR 7933 Requirements and  

E-Print Network [OSTI]

NISTIR 7933 Requirements and Conformance Test Assertions for ANSI/NIST-ITL 1-2011 Record Type 18 #12;ii NISTIR 7933 Requirements and Conformance Test Assertions for ANSI/NIST-ITL 1-2011 Record Type/CTS designed to test implementations of ANSI/NIST-ITL 1- 2011 (AN-2011) "Data Format for the Interchange

99

Recommended surrogate PCB waste feed and fuel compositions to meet requirements given in Spec. K/D 5552 for test burns in the Martin Marietta Energy Systems Inc. incinerator  

SciTech Connect (OSTI)

Waste feed heats of combustion, principle organic hazardous constituents (POHCs), ash contents, and organic chlorine concentrations are specified in Table 3 of Spec. No. K/D-5552 for test burns 1 through 7 in the Martin Marietta Energy Systems, Inc. incinerator. The first four tests are intended to demonstrate that the incinerator will meet RCRA emission standards, HCl removal efficiencies, and requirements for destruction of POHCs. A mix containing 1,2-dichloro-, 1,2,4-trichloro-, and 1,2,4,5-tetrachlorobenzenes with a small amount of hexachlorobenzene is recommended as a PCB surrogate for test burns 5 and 6 to simulate the destructibility of PCBs in plant wastes. The mix would be diluted with appropriate amounts of dimethyl malonate and kerosene to obtain a homogeneous solution having the required heat of combustion and chlorine content for the liquid waste feeds. For test burn 7 the polychlorinated benzene mix would contain a small amount of hexachlorobenzene with larger amounts of 1,2,4,5-tetrachloro- and 1,2,4-trichlorobenzenes. The composition of the polychlorinated mixes is such that they should be comparable to Aroclor 1254 in overall destructibility by incineration, and achievement of a DRE for hexachlorobenzene greater than 99.99% in the test burns should provide assurance that the incinerator will be able to destroy PCBs in Aroclor 1260, which is the most refractory PCB mix present in plant wastes. If hexachlorobenzene is not available for these tests, hexachlorocyclopentadiene is recommended as a substitute for hexachlorobenzene in tests 5-7, which involve a PCB surrogate, and hexachloroethane is recommended as the alternative solid waste feed for test 4. Solutions containing kerosene and methanol are recommended as liquid fuels for tests 1 and 4 to achieve the required heats of combustion, while a dimethyl malonate-methanol solution is recommended to achieve the 7000 Btu/lb heat of combustion for test burn 2.

Anderson, R.W.

1984-12-28T23:59:59.000Z

100

Test Automation Test Automation  

E-Print Network [OSTI]

Test Automation Test Automation Mohammad Mousavi Eindhoven University of Technology, The Netherlands Software Testing 2013 Mousavi: Test Automation #12;Test Automation Outline Test Automation Mousavi: Test Automation #12;Test Automation Why? Challenges of Manual Testing Test-case design: Choosing inputs

Mousavi, Mohammad

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Requirements Definition Stage  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter addresses development of a Software Configuration Management Plan to track and control work products, analysis of the system owner/users' business processes and needs, translation of those processes and needs into formal requirements, and planning the testing activities to validate the performance of the software product.

1997-05-21T23:59:59.000Z

102

ASCR Science Network Requirements  

SciTech Connect (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In April 2009 ESnet and the Office of Advanced Scientific Computing Research (ASCR), of the DOE Office of Science, organized a workshop to characterize the networking requirements of the programs funded by ASCR. The ASCR facilities anticipate significant increases in wide area bandwidth utilization, driven largely by the increased capabilities of computational resources and the wide scope of collaboration that is a hallmark of modern science. Many scientists move data sets between facilities for analysis, and in some cases (for example the Earth System Grid and the Open Science Grid), data distribution is an essential component of the use of ASCR facilities by scientists. Due to the projected growth in wide area data transfer needs, the ASCR supercomputer centers all expect to deploy and use 100 Gigabit per second networking technology for wide area connectivity as soon as that deployment is financially feasible. In addition to the network connectivity that ESnet provides, the ESnet Collaboration Services (ECS) are critical to several science communities. ESnet identity and trust services, such as the DOEGrids certificate authority, are widely used both by the supercomputer centers and by collaborations such as Open Science Grid (OSG) and the Earth System Grid (ESG). Ease of use is a key determinant of the scientific utility of network-based services. Therefore, a key enabling aspect for scientists beneficial use of high performance networks is a consistent, widely deployed, well-maintained toolset that is optimized for wide area, high-speed data transfer (e.g. GridFTP) that allows scientists to easily utilize the services and capabilities that the network provides. Network test and measurement is an important part of ensuring that these tools and network services are functioning correctly. One example of a tool in this area is the recently developed perfSONAR, which has already shown its usefulness in fault diagnosis during the recent deployment of high-performance data movers at NERSC and ORNL. On the other hand, it is clear that there is significant work to be done in the area of authentication and access control - there are currently compatibility problems and differing requirements between the authentication systems in use at different facilities, and the policies and mechanisms in use at different facilities are sometimes in conflict. Finally, long-term software maintenance was of concern for many attendees. Scientists rely heavily on a large deployed base of software that does not have secure programmatic funding. Software packages for which this is true include data transfer tools such as GridFTP as well as identity management and other software infrastructure that forms a critical part of the Open Science Grid and the Earth System Grid.

Dart, Eli; Tierney, Brian

2009-08-24T23:59:59.000Z

103

In-service Inspection Ultrasonic Testing of Reactor Pressure Vessel Welds for Assessing Flaw Density and Size Distribution per 10 CFR 50.61a, Alternate Fracture Toughness Requirements  

SciTech Connect (OSTI)

Pressurized thermal shock (PTS) events are system transients in a pressurized water reactor (PWR) in which there is a rapid operating temperature cool-down that results in cold vessel temperatures with or without repressurization of the vessel. The rapid cooling of the inside surface of the reactor pressure vessel (RPV) causes thermal stresses that can combine with stresses caused by high pressure. The aggregate effect of these stresses is an increase in the potential for fracture if a pre-existing flaw is present in a material susceptible to brittle failure. The ferritic, low alloy steel of the reactor vessel beltline adjacent to the core, where neutron radiation gradually embrittles the material over the lifetime of the plant, can be susceptible to brittle fracture. The PTS rule, described in the Code of Federal Regulations, Title 10, Section 50.61 (50.61), Fracture Toughness Requirements for Protection against Pressurized Thermal Shock Events, adopted on July 23, 1985, establishes screening criteria to ensure that the potential for a reactor vessel to fail due to a PTS event is deemed to be acceptably low. The U.S. Nuclear Regulatory Commission (NRC) completed a research program that concluded that the risk of through-wall cracking due to a PTS event is much lower than previously estimated. The NRC subsequently developed a rule, 50.61a, published on January 4, 2010, entitled Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events (75 FR 13). Use of the new rule by licensees is optional. The 50.61a rule differs from 50.61 in that it requires licensees who choose to follow this alternate method to analyze the results from periodic volumetric examinations required by the ASME Code, Section XI, Rules for Inservice Inspection (ISI) of Nuclear Power Plants. These analyses are intended to determine if the actual flaw density and size distribution in the licensees reactor vessel beltline welds are bounded by the flaw density and size distribution values used in the PTS technical basis. Under a contract with the NRC, Pacific Northwest National Laboratory (PNNL) has been working on a program to assess the ability of current inservice inspection (ISI)-ultrasonic testing (UT) techniques, as qualified through ASME Code, Appendix VIII, Supplements 4 and 6, to detect small fabrication or inservice-induced flaws located in RPV welds and adjacent base materials. As part of this effort, the investigators have pursued an evaluation, based on the available information, of the capability of UT to provide flaw density/distribution inputs for making RPV weld assessments in accordance with 50.61a. This paper presents the results of an evaluation of data from the 1993 Browns Ferry Nuclear Plant, Unit 3, Spirit of Appendix VIII reactor vessel examination, a comparison of the flaw density/distribution from this data with the distribution in 50.61a, possible reasons for differences, and plans and recommendations for further work in this area.

Sullivan, Edmund J.; Anderson, Michael T.; Norris, Wallace

2012-09-17T23:59:59.000Z

104

Graduation Requirements and Procedures Graduation Requirements and  

E-Print Network [OSTI]

/Degree Audit (DARS) or contact the department offering the major. Graduation Average Requirement The minimum

105

LEGACY MANAGEMENT REQUIRES INFORMATION  

SciTech Connect (OSTI)

''Legacy Management Requires Information'' describes the goal(s) of the US Department of Energy's Office of Legacy Management (LM) relative to maintaining critical records and the way those goals are being addressed at Hanford. The paper discusses the current practices for document control, as well as the use of modern databases for both storing and accessing the data to support cleanup decisions. In addition to the information goals of LM, the Hanford Federal Facility Agreement and Consent Order, known as the ''Tri-Party Agreement'' (TPA) is one of the main drivers in documentation and data management. The TPA, which specifies discrete milestones for cleaning up the Hanford Site, is a legally binding agreement among the US Department of Energy (DOE), the Washington State Department of Ecology (Ecology), and the US Environmental Protection Agency (EPA). The TPA requires that DOE provide the lead regulatory agency with the results of analytical laboratory and non-laboratory tests/readings to help guide them in making decisions. The Agreement also calls for each signatory to preserve--for at least ten years after the Agreement has ended--all of the records in its or its contractors, possession related to sampling, analysis, investigations, and monitoring conducted. The tools used at Hanford to meet TPA requirements are also the tools that can satisfy the needs of LM.

CONNELL, C.W.; HILDEBRAND, R.D.

2006-12-14T23:59:59.000Z

106

CISC 327 -Fall 2014 ! Course Project Assignment #1 -Front End Requirements!  

E-Print Network [OSTI]

represent those requirements as a set of requirements tests. The basic idea is to analyze the requirements, and create a test case for each piece. We will study this more in class.! !Create and organize a complete set of requirements tests for the Front End of Quinterac, to test for every required behaviour (of the Front End only

Cordy, James R.

107

CSCI 3060U/ENGR 3980U -Winter 2013 Course Project Assignment #1 -Front End Requirements  

E-Print Network [OSTI]

and in true XP fashion represent those requirements as a set of requirements tests. Create and organize a complete set of requirements tests for the Front End of the Ticket Selling Service, to test for every required behaviour. Do not write any programs yet. Each test should be a complete test session input stream

Bradbury, Jeremy S.

108

Coaxial test fixture  

DOE Patents [OSTI]

This invention pertains to arrangements for performing electrical tests on contact material samples, and in particular for testing contact material test samples in an evacuated environment under high current loads. Frequently, it is desirable in developing high-current separable contact material, to have at least a preliminary analysis of selected candidate conductor materials. Testing of material samples will hopefully identify materials unsuitable for high current electrical contact without requiring incorporation of the materials into a completed and oftentimes complex structure.

Praeg, W.F.

1984-03-30T23:59:59.000Z

109

SPECTR System Operational Test Report  

SciTech Connect (OSTI)

This report overviews installation of the Small Pressure Cycling Test Rig (SPECTR) and documents the system operational testing performed to demonstrate that it meets the requirements for operations. The system operational testing involved operation of the furnace system to the design conditions and demonstration of the test article gas supply system using a simulated test article. The furnace and test article systems were demonstrated to meet the design requirements for the Next Generation Nuclear Plant. Therefore, the system is deemed acceptable and is ready for actual test article testing.

W.H. Landman Jr.

2011-08-01T23:59:59.000Z

110

DOE Testing Reveals Samsung Refrigerator Does Not Meet Energy...  

Broader source: Energy.gov (indexed) [DOE]

Testing Reveals Samsung Refrigerator Does Not Meet Energy Star Requirements DOE Testing Reveals Samsung Refrigerator Does Not Meet Energy Star Requirements March 16, 2010 - 4:28pm...

111

Evaluation on the Feasibility of Using Ultrasonic Testing of Reactor Pressure Vessel Welds for Assessing Flaw Density/Distribution per 10 CFR 50.61a, Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock  

SciTech Connect (OSTI)

This technical letter report provides the status of an assessment undertaken by PNNL at the request of the NRC to verify the capability of periodic ASME-required volumetric examinations of reactor vessels to characterize the density and distribution of flaws of interest for applying 50.61a on a plant-by-plant basis. The PTS rule, described in the Code of Federal Regulations, Title 10, Section 50.61 (50.61), "Fracture Toughness Requirements for Protection against Pressurized Thermal Shock Events," establishes screening criteria to ensure that the potential for a reactor vessel to fail due to a PTS event is deemed to be acceptably low. Recently, the NRC completed a research program that concluded that the risk of through-wall cracking due to a PTS event is much lower than previously estimated. The NRC subsequently developed and promulgated an alternate PTS rule, 50.61a, that can be implemented by PWR licensees. The 50.61a rule differs from 50.61 in that it requires licensees who choose to follow this alternate method to analyze the results from periodic volumetric examinations required by the ASME Code, Section XI, Rules for Inservice Inspection (ISI) of Nuclear Power Plants.

Sullivan, Edmund J.; Anderson, Michael T.

2014-06-10T23:59:59.000Z

112

NREL Battery Thermal and Life Test Facility (Presentation)  

SciTech Connect (OSTI)

This presentation describes NREL's Battery Thermal Test Facility and identifies test requirements and equipment and planned upgrades to the facility.

Keyser, M.

2011-05-01T23:59:59.000Z

113

The requirements discovery process  

SciTech Connect (OSTI)

Cost and schedule overruns are often caused by poor requirements that are produced by people who do not understand the requirement process. This paper provides a high-level overview of the requirements discovery process.

Bahill, A.T. [Univ. of Arizona, Tucson, AZ (United States). Systems and Industrial Engineering; Dean, F.F. [Sandia National Lab., Albuquerque, NM (United States)

1997-02-01T23:59:59.000Z

114

Test-Architecture Optimization and Test Scheduling for SOCs with Core-Level Expansion of Compressed Test Patterns  

E-Print Network [OSTI]

is resulting in high test times and excessive tester memory requirements. To reduce both test time and test International Technology Roadmap for Semiconductors predicted that test data volume and test time will grow 30x and wrappers for core access can be combined with test scheduling at SOC level to reduce test time. The recent

Chakrabarty, Krishnendu

115

Test Series 2. 3 detailed test plan  

SciTech Connect (OSTI)

Test Series 2.3 is chronologically the second of the five sub-series of tests which comprise Test Series 2, the second major Test Series as part of the combustion research phase to be carried out at the Grimethorpe Experimental Pressurised Fluidised Bed Combustion Facility. Test Series 2.3 will consist of 700 data gathering hours which is expected to require some 1035 coal burning hours. The tests will be performed using US supplied coal and dolomite. This will be the first major series of tests on the Facility with other than the UK datum coal and dolomite. The document summarises the background to the facility and the experimental program. Described are modifications which have been made to the facility following Test Series 2.1 and a series of Screening Tests. Detailed test objectives are specified as are the test conditions for the experiments which comprise the test series. The test results will provide information on the effects of the bed temperature, excess air level, Ca/S ratio, number of coal feed lines, and combustion efficiency and sulphur retention. A significant aspect of the test series will be part load tests which will investigate the performance of the facility under conditions of turn down which simulate load following concepts specified for two combined cycle concepts, i.e., their CFCC combined cycle and a turbo charged combined cycle. The material test plan is also presented. The principal feature of the materials programme is the planned exposure of a set of static turbine blade specimens in a cascade test loop to the high temperature, high pressure flue gas. A schedule for the programme is presented as are contingency plans.

Not Available

1983-12-01T23:59:59.000Z

116

Federal Substance Abuse Testing Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order establishes the requirements and responsibilities for the DOE Federal Substance Abuse Testing Program which covers drug and alcohol testing. Cancels DOE O 3792.3 Chg 1.

2014-01-30T23:59:59.000Z

117

Cylinder Test Specification  

SciTech Connect (OSTI)

The purpose of the cylinder testis two-fold: (1) to characterize the metal-pushing ability of an explosive relative to that of other explosives as evaluated by the E{sub 19} cylinder energy and the G{sub 19} Gurney energy and (2) to help establish the explosive product equation-of-state (historically, the Jones-Wilkins-Lee (JWL) equation). This specification details the material requirements and procedures necessary to assemble and fire a typical Los Alamos National Laboratory (LANL) cylinder test. Strict adherence to the cylinder. material properties, machining tolerances, material heat-treatment and etching processes, and high explosive machining tolerances is essential for test-to-test consistency and to maximize radial wall expansions. Assembly and setup of the cylinder test require precise attention to detail, especially when placing intricate pin wires on the cylinder wall. The cylinder test is typically fired outdoors and at ambient temperature.

Richard Catanach; Larry Hill; Herbert Harry; Ernest Aragon; Don Murk

1999-10-01T23:59:59.000Z

118

Allocating Reserve Requirements (Presentation)  

SciTech Connect (OSTI)

This presentation provides an overview of present and possible future ways to allocate and assign benefits for reserve requirements.

Milligan, M.; Kirby, B.; King, J.

2011-07-01T23:59:59.000Z

119

BER Science Network Requirements  

E-Print Network [OSTI]

Management and analysis of geospatial data involvingmanipulation, analysis, and display of geospatial data,Analysis and interpretation require mapping geospatial

Dart, Eli

2011-01-01T23:59:59.000Z

120

Regulators, Requirements, Statutes  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Statutes Regulators, Requirements, Statutes The Laboratory must comply with environmental laws and regulations that apply to Laboratory operations. Contact Environmental...

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

FES Science Network Requirements  

E-Print Network [OSTI]

FES Science Network Requirements Report of the Fusion Energy Sciences Network Requirements Workshop Conducted March 13 and 14, 2008 #12;FES Science Network Requirements Workshop Fusion Energy Sciences Program Office, DOE Office of Science Energy Sciences Network Gaithersburg, MD ­ March 13 and 14, 2008 ESnet

Geddes, Cameron Guy Robinson

122

Improvements to Technical Specifications surveillance requirements  

SciTech Connect (OSTI)

In August 1983 an NRC task group was formed to investigate problems with surveillance testing required by Technical Specifications, and to recommend approaches to effect improvements. NUREG-1024 ( Technical Specifications-Enhancing Safety Impact'') resulted, and it contained recommendations to review the basis for test frequencies; to ensure that the tests promote safety and do not degrade equipment; and to review surveillance tests so that they do not unnecessarily burden personnel. The Technical Specifications Improvement Program (TSIP) was established in December 1984 to provide the framework for rewriting and improving the Technical Specifications. As an element of the TSIP, all Technical Specifications surveillance requirements were comprehensively examined as recommended in NUREG-1024. The results of that effort are presented in this report. The study found that while some testing at power is essential to verify equipment and system operability, safety can be improved, equipment degradation decreased, and unnecessary personnel burden relaxed by reducing the amount of testing at power.

Lobel, R.; Tjader, T.R.

1992-12-01T23:59:59.000Z

123

Pendulum detector testing device  

DOE Patents [OSTI]

A detector testing device which provides consistent, cost-effective, repeatable results. The testing device is primarily constructed of PVC plastic and other non-metallic materials. Sensitivity of a walk-through detector system can be checked by: 1) providing a standard test object simulating the mass, size and material content of a weapon or other contraband, 2) suspending the test object in successive positions, such as head, waist and ankle levels, simulating where the contraband might be concealed on a person walking through the detector system; and 3) swinging the suspended object through each of the positions, while operating the detector system and observing its response. The test object is retained in a holder in which the orientation of the test device or target can be readily changed, to properly complete the testing requirements.

Gonsalves, John M. (Modesto, CA)

1997-01-01T23:59:59.000Z

124

Pendulum detector testing device  

DOE Patents [OSTI]

A detector testing device is described which provides consistent, cost-effective, repeatable results. The testing device is primarily constructed of PVC plastic and other non-metallic materials. Sensitivity of a walk-through detector system can be checked by: (1) providing a standard test object simulating the mass, size and material content of a weapon or other contraband, (2) suspending the test object in successive positions, such as head, waist and ankle levels, simulating where the contraband might be concealed on a person walking through the detector system; and (3) swinging the suspended object through each of the positions, while operating the detector system and observing its response. The test object is retained in a holder in which the orientation of the test device or target can be readily changed, to properly complete the testing requirements. 5 figs.

Gonsalves, J.M.

1997-09-30T23:59:59.000Z

125

Characterizing Test Methods and Emissions Reduction Performance...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Test Methods and Emissions Reduction Performance of In-Use Diesel Retrofit Technologies from the National Clean Diesel Campaign Characterizing Test Methods and Emissions Reduction...

126

Transportation System Requirements Document  

SciTech Connect (OSTI)

This Transportation System Requirements Document (Trans-SRD) describes the functions to be performed by and the technical requirements for the Transportation System to transport spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from Purchaser and Producer sites to a Civilian Radioactive Waste Management System (CRWMS) site, and between CRWMS sites. The purpose of this document is to define the system-level requirements for Transportation consistent with the CRWMS Requirement Document (CRD). These requirements include design and operations requirements to the extent they impact on the development of the physical segments of Transportation. The document also presents an overall description of Transportation, its functions, its segments, and the requirements allocated to the segments and the system-level interfaces with Transportation. The interface identification and description are published in the CRWMS Interface Specification.

Not Available

1993-09-01T23:59:59.000Z

127

Specific test and evaluation plan  

SciTech Connect (OSTI)

The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AX-B Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.

Hays, W.H.

1998-03-20T23:59:59.000Z

128

Nutritional requirements of sesame  

E-Print Network [OSTI]

L)&RARYi ~st t~6~ 0F TEXACO NUTRITIONAL REQUIREMENTS OF SESAME A Thesis By JOE C. ELLER Submitted to the Graduate School of the Agricultural and Mechanical College of Texas in. partial fulfillment of the requirements for the degree of M... AS TER 0 F SCIENC E January 1958 Major Subject: Agronomy NUTRITIONAL REQUIREMENTS OF SESAME A Thesis JOE C. ELLER Approved. as to style and content by. ' Chairman of Committee Head qg Department January 1958 ACKNOWLEDGEMENT The author wishes...

Eller, Joe C

1958-01-01T23:59:59.000Z

129

Required Annual Notices  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Required Annual Notices The Women's Health and Cancer Rights Act of 1998 (WHCRA) The medical programs sponsored by LANS will not restrict benefits if you or your dependent...

130

Unreviewed Safety Question Requirements  

Broader source: Energy.gov (indexed) [DOE]

Unreviewed Safety Question Requirements FUNCTIONAL AREA GOAL: A fully compliant Unreviewed Safety Question (USQ) program is implemented and maintained across the site....

131

Transuranic Waste Requirements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The guide provides criteria for determining if a waste is to be managed in accordance with DOE M 435.1-1, Chapter III, Transuranic Waste Requirements.

1999-07-09T23:59:59.000Z

132

Integrated Management Requirements mapping  

SciTech Connect (OSTI)

This document contains five appendices documenting how Sandia implemented the DOE Conduct of Operations (5480.19) and DOE Quality Assurance (5700.6C) orders. It provides a mapping of the Sandia integrated requirements to the specific requirements of each Order and a mapping to Sandia`s approved program for implementing the Conduct of Operations Order.

Holmes, J.T.; Andrews, N.S.

1992-06-01T23:59:59.000Z

133

Integrated Management Requirements mapping  

SciTech Connect (OSTI)

This document contains five appendices documenting how Sandia implemented the DOE Conduct of Operations (5480.19) and DOE Quality Assurance (5700.6C) orders. It provides a mapping of the Sandia integrated requirements to the specific requirements of each Order and a mapping to Sandia's approved program for implementing the Conduct of Operations Order.

Holmes, J.T.; Andrews, N.S.

1992-06-01T23:59:59.000Z

134

High School if required  

E-Print Network [OSTI]

Chemistry II CHEM AP 4-5 Lab required @ UNLV; contact Chemistry PHYS 182 & 182L Engineering Physics III PHYS General Chemistry I CHEM AP 3 Lab required @ UNLV; contact Chemistry CHEM 241 Organic Chemistry I & CHEM 347 Lab Techniques of Organic Chem I CHEM 242 Organic Chemistry II & CHEM 348 Lab Techniques

Walker, Lawrence R.

135

General Responsibilities and Requirements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The material presented in this guide provides suggestions and acceptable ways of implementing DOE M 435.1-1 and should not be viewed as additional or mandatory requirements. The objective of the guide is to ensure that responsible individuals understand what is necessary and acceptable for implementing the requirements of DOE M 435.1-1.

1999-07-09T23:59:59.000Z

136

Heuristic Search with Reachability Tests for Automated Generation of Test Programs  

E-Print Network [OSTI]

Heuristic Search with Reachability Tests for Automated Generation of Test Programs Wee Kheng Leow specification-based soft- ware testing has focused on the automated generation of test cases. Before a software system can be tested, it must be set up according to the input requirements of the test cases. This setup

Leow, Wee Kheng

137

Gas Test Loop Booster Fuel Hydraulic Testing  

SciTech Connect (OSTI)

The Gas Test Loop (GTL) project is for the design of an adaptation to the Advanced Test Reactor (ATR) to create a fast-flux test space where fuels and materials for advanced reactor concepts can undergo irradiation testing. Incident to that design, it was found necessary to make use of special booster fuel to enhance the neutron flux in the reactor lobe in which the Gas Test Loop will be installed. Because the booster fuel is of a different composition and configuration from standard ATR fuel, it is necessary to qualify the booster fuel for use in the ATR. Part of that qualification is the determination that required thermal hydraulic criteria will be met under routine operation and under selected accident scenarios. The Hydraulic Testing task in the GTL project facilitates that determination by measuring flow coefficients (pressure drops) over various regions of the booster fuel over a range of primary coolant flow rates. A high-fidelity model of the NW lobe of the ATR with associated flow baffle, in-pile-tube, and below-core flow channels was designed, constructed and located in the Idaho State University Thermal Fluids Laboratory. A circulation loop was designed and constructed by the university to provide reactor-relevant water flow rates to the test system. Models of the four booster fuel elements required for GTL operation were fabricated from aluminum (no uranium or means of heating) and placed in the flow channel. One of these was instrumented with Pitot tubes to measure flow velocities in the channels between the three booster fuel plates and between the innermost and outermost plates and the side walls of the flow annulus. Flow coefficients in the range of 4 to 6.5 were determined from the measurements made for the upper and middle parts of the booster fuel elements. The flow coefficient for the lower end of the booster fuel and the sub-core flow channel was lower at 2.3.

Gas Test Loop Hydraulic Testing Staff

2006-09-01T23:59:59.000Z

138

Thermal test options  

SciTech Connect (OSTI)

Shipping containers for radioactive materials must be qualified to meet a thermal accident environment specified in regulations, such at Title 10, Code of Federal Regulations, Part 71. Aimed primarily at the shipping container design, this report discusses the thermal testing options available for meeting the regulatory requirements, and states the advantages and disadvantages of each approach. The principal options considered are testing with radiant heat, furnaces, and open pool fires. The report also identifies some of the facilities available and current contacts. Finally, the report makes some recommendations on the appropriate use of these different testing methods.

Koski, J.A.; Keltner, N.R.; Sobolik, K.B.

1993-02-01T23:59:59.000Z

139

Transportation Infrastructure Requirement Resources  

Broader source: Energy.gov [DOE]

Federal agencies and certain state governments are required to acquire alternative fuel vehicles as part of the Energy Policy Act of 1992, though they are also entitled to choose a petroleum...

140

BES Science Network Requirements  

E-Print Network [OSTI]

the Directors of the Office of Science, Office of AdvancedOffice of Basic Energy Sciences. This is LBNL report LBNL-BES Science Network Requirements Report of the Basic Energy

Dart, Eli

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Timeline for Net Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

x By July 31 of each Forecast Year, BPA publishes all Load Following customers' Net Requirements data for the two years of the upcoming Rate Period. 17.6.1 7312010 Yes...

142

Selected Guidance & Requirements  

Broader source: Energy.gov [DOE]

This page contains the most requested NEPA guidance and requirement documents and those most often recommended by the Office of NEPA Policy and Compliance. Documents are listed by agency, in...

143

Promulgating Nuclear Safety Requirements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Applies to all Nuclear Safety Requirements Adopted by the Department to Govern the Conduct of its Nuclear Activities. Cancels DOE P 410.1. Canceled by DOE N 251.85.

1996-05-15T23:59:59.000Z

144

Test Images  

E-Print Network [OSTI]

Test Images. I hope to have a set of test images for the course soon. Some images are available now; some will have to wait until I can find another 100-200

145

Conditions Required by Law  

E-Print Network [OSTI]

No No Sto H 2 NoIs it required by law "Violence on children"?164.512 (c) (1) H CE may disclose to government to LEO HCE may not disclose to LEO H No Yes No Required by law: "reporting certain type of injuries"? H disclose to LEO H 164.512 (f) (1) (ii) (C)(2) It provides that the request is specific and limited in scope

Khan, Javed I.

146

An Assessment of Fault Current Limiter Testing Requirements | Department of  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustionImprovement3--Logistical Challenges to Smart Grid Implementation |Challenge1Amir Roth

147

Prematurely terminated slug tests  

SciTech Connect (OSTI)

A solution of the well response to a prematurely terminated slug test (PTST) is presented. The advantages of a PTST over conventional slug tests are discussed. A systematized procedure of a PTST is proposed, where a slug test is terminated in the midpoint of the flow point, and the subsequent shut-in data is recorded and analyzed. This method requires a downhole shut-in device and a pressure transducer, which is no more than the conventional deep-well slug testing. As opposed to slug tests, which are ineffective when a skin is present, more accurate estimate of formation permeability can be made using a PTST. Premature termination also shortens the test duration considerably. Because in most cases no more information is gained by completing a slug test to the end, the author recommends that conventional slug tests be replaced by the premature termination technique. This study is part of an investigation of the feasibility of geologic isolation of nuclear wastes being carried out by the US Department of Energy and the National Cooperative for the Storage of Radioactive Waste of Switzerland.

Karasaki, K. (Lawrence Berkeley Lab., CA (USA))

1990-07-01T23:59:59.000Z

148

Minor in Philosophy Requirements  

E-Print Network [OSTI]

2012-05-23 Minor in Philosophy Requirements: 1. 18 hours of work in philosophy with grades of C- or better. 2. A 2.0 grade point average for all work attempted in philosophy. 3. 9 hours of upper division work in philosophy, with grades of C- or better. 4. Completion of at least one course, with a grade

Stowell, Michael

149

Requirements for Xenon International  

SciTech Connect (OSTI)

This document defines the requirements for the new Xenon International radioxenon system. The output of this project will be a Pacific Northwest National Laboratory (PNNL) developed prototype and a manufacturer-developed production prototype. The two prototypes are intended to be as close to matching as possible; this will be facilitated by overlapping development cycles and open communication between PNNL and the manufacturer.

Hayes, James C.; Ely, James H.

2013-09-26T23:59:59.000Z

150

THE REQUIREMENTS OF A FUSION DEMONSTRATION  

E-Print Network [OSTI]

and will analyze the strategies, facilities, and prior testing requirements needed to demonstrate electric power Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes constitute or imply its endorsement, recommendation, or favoring by the United States Government or any

Najmabadi, Farrokh

151

CALiPER Testing  

Broader source: Energy.gov [DOE]

The CALiPER (Commercially Available LED Product Evaluation and Reporting) program was launched by DOE in 2006 to support testing of a representative array of solid-state lighting products for general illumination, using industry-approved test procedures carried out by qualified test labs. The program has evolved right along with the SSL market and serves multiple needs. CALiPER testing and analysis identify trends, indicate SSL's suitability for particular applications, and detect secondary issues that require further scrutiny such as glare, flicker, physical format, and reliability concerns. The program not only guides DOE planning and helps discourage low-quality products and inflated claims, but also serves as a useful tool for manufacturers seeking to improve their products, and for municipalities, utilities, and energy-efficiency programs seeking to make informed program decisions.

152

Intrusion detection sensor testing tools  

SciTech Connect (OSTI)

Intrusion detection sensors must be frequently tested to verify that they are operational, and they must be periodically tested to verify that they are functioning at required performance levels. Concerns involving this testing can include: The significant amount of manpower required, inconsistent results due to variability in methods and personnel, exposure of personnel to hazardous environments, and difficulty in obtaining access to the areas containing some of the intrusion sensors. To address these concerns, the Department of Energy directed Sandia National Labs. to develop intrusion detection sensor testing tools. Over the past two years Sandia has developed several sensor testing tool prototypes. This paper describes the evolution of an exterior intrusion detection sensor tester and automatic data logger, and also describes various interior intrusion detection sensor test fixtures that can be remotely activated to simulate an intruder.

Hayward, D.R.

1994-08-01T23:59:59.000Z

153

BER Science Network Requirements  

SciTech Connect (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In April 2010 ESnet and the Office of Biological and Environmental Research, of the DOE Office of Science, organized a workshop to characterize the networking requirements of the science programs funded by BER. The requirements identified at the workshop are summarized and described in more detail in the case studies and the Findings section. A number of common themes emerged from the case studies and workshop discussions. One is that BER science, like many other disciplines, is becoming more and more distributed and collaborative in nature. Another common theme is that data set sizes are exploding. Climate Science in particular is on the verge of needing to manage exabytes of data, and Genomics is on the verge of a huge paradigm shift in the number of sites with sequencers and the amount of sequencer data being generated.

Dart, Eli; Tierney, Brian

2010-11-01T23:59:59.000Z

154

Siphon breaker design requirements  

SciTech Connect (OSTI)

This project was intended to provide experimental data on siphon flow effects. The system was to be modeled with the RELAP code and the predicted and measured performances compared. The experimental system consists of a 500-gallon upper tank, a 4-inch downcomer pipe, a lower catch tank, a return pump and associated piping. The downcomer pipe is made of 4-inch clear acrylic pipe so the flow patterns could be observed and video taped during the test runs.

Neill, D.T.; Stephens, A.G.

1990-01-01T23:59:59.000Z

155

Advanced Duct Sealing Testing  

SciTech Connect (OSTI)

Duct leakage has been identified as a major source of energy loss in residential buildings. Most duct leakage occurs at the connections to registers, plenums or branches in the duct system. At each of these connections a method of sealing the duct system is required. Typical sealing methods include tapes or mastics applied around the joints in the system. Field examinations of duct systems have typically shown that these seals tend to fail over extended periods of time. The Lawrence Berkeley National Laboratory has been testing sealant durability for several years. Typical duct tape (i.e. fabric backed tapes with natural rubber adhesives) was found to fail more rapidly than all other duct sealants. This report summarizes the results of duct sealant durability testing of five UL 181B-FX listed duct tapes (three cloth tapes, a foil tape and an Oriented Polypropylene (OPP) tape). One of the cloth tapes was specifically developed in collaboration with a tape manufacturer to perform better in our durability testing. The first test involved the aging of common ''core-to-collar joints'' of flexible duct to sheet metal collars, and sheet metal ''collar-to-plenum joints'' pressurized with 200 F (93 C) air. The second test consisted of baking duct tape specimens in a constant 212 F (100 C) oven following the UL 181B-FX ''Temperature Test'' requirements. Additional tests were also performed on only two tapes using sheet metal collar-to-plenum joints. Since an unsealed flexible duct joint can have a variable leakage depending on the positioning of the flexible duct core, the durability of the flexible duct joints could not be based on the 10% of unsealed leakage criteria. Nevertheless, the leakage of the sealed specimens prior to testing could be considered as a basis for a failure criteria. Visual inspection was also documented throughout the tests. The flexible duct core-to-collar joints were inspected monthly, while the sheet metal collar-to-plenum joints were inspected weekly. The baking test specimens were visually inspected weekly, and the durability was judged by the observed deterioration in terms of brittleness, cracking, flaking and blistering (the terminology used in the UL 181B-FX test procedure).

Sherman, Max H.; Walker, Iain S.

2003-08-01T23:59:59.000Z

156

Test Comparability  

E-Print Network [OSTI]

KU ScholarWorks | http://kuscholarworks.ku.edu Test Comparability 2010 by Christine Keller and David Shulenburger This work has been made available by the University of Kansas Libraries Office of Scholarly Communication and Copyright. Please... and Shulenburger, David. Test comparability, with Christine Keller in the Letters section of Change, September/October 2010, p. 6. Published version: http://www.changemag.org/Archives/Back%20 Issues/September-October%202010/letters-to-editor.html Terms of Use...

Keller, Christine; Shulenburger, David E.

2010-01-01T23:59:59.000Z

157

Documentation Requirements for Sensory Impairments  

E-Print Network [OSTI]

Documentation Requirements for Sensory Impairments Vision and Hearing Students, faculty, staff documentation requirements: 1. Requirements of the PRACTITIONER: A) Ophthalmologists and optometrists of interest. C) Documentation must be typed, dated and signed by the evaluator and submitted to ODR

158

BES Science Network Requirements  

SciTech Connect (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivityfor the US Department of Energy Office of Science (SC), the single largest supporter of basic research in the physical sciences in the United States. In support of the Office ofScience programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years.

Dart, Eli; Tierney, Brian; Dart, Eli; Biocca, A.; Carlson, R.; Chen, J.; Cotter, S.; Dattoria, V.; Davenport, J.; Gaenko, A.; Kent, P.; Lamm, M.; Miller, S.; Mundy, C.; Ndousse, T.; Pederson, M.; Perazzo, A.; Popescu, R.; Rouson, D.; Sekine, Y.; Sumpter, B.; Wang, C.-Z.; Whitelam, S.; Zurawski, J.

2011-02-01T23:59:59.000Z

159

Required Annual Notices  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -the Mid-Infrared at 278, 298,NIST31 ORVEnergy Request For Report7Required

160

Required Annual Notices  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -the Mid-Infrared at 278, 298,NIST31 ORVEnergy Request For Report7RequiredAnnual

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Software Testing and Maintenance 1 Regression Testing  

E-Print Network [OSTI]

1 Software Testing and Maintenance 1 Regression Testing Introduction Test Selection Test Minimization Test Prioritization Summary Software Testing and Maintenance 2 What is it? Regression testing refers to the portion of the test cycle in which a program is tested to ensure that changes do not affect

Lei, Jeff Yu

162

Test Automation Ant JUnit Test Automation  

E-Print Network [OSTI]

Test Automation Ant JUnit Test Automation Mohammad Mousavi Eindhoven University of Technology, The Netherlands Software Testing 2012 Mousavi: Test Automation #12;Test Automation Ant JUnit Outline Test Automation Ant JUnit Mousavi: Test Automation #12;Test Automation Ant JUnit Why? Challenges of Manual Testing

Mousavi, Mohammad

163

ENVIRONMENTAL HEALTH SCIENCES Plan Requirements Campus: UMICH RG = Requirement Group  

E-Print Network [OSTI]

ENVIRONMENTAL HEALTH SCIENCES Plan Requirements Campus: UMICH RG = Requirement Group Career: GPH RQ = Requirement Program: 01848 LN = Line Plan: 3200MPH RG 5298 ENVIRONMENTAL HEALTH SCIENCES REQUIREMENTS, 643, 653, 675, 677 or 695 LN 0030 - Environmental Health Sciences: EHS 501, 506, 507 or 508 LN 0040

Shyy, Wei

164

BIOMEDICAL ENGINEERING BSE PLAN REQUIREMENTS Campus: UMICH RG = Requirement Group  

E-Print Network [OSTI]

BIOMEDICAL ENGINEERING BSE PLAN REQUIREMENTS Campus: UMICH RG = Requirement Group Career: UENG RQ = Requirement Program: LN = Line Plan: 0880BSE Sub-Plan: RG 6856 BIOMEDICAL ENGINEERING MAJOR REQUIREMENTS Effective FA05/1560 (09/06/2005) RQ 4996 Program Subjects Effective FA05/1560 (09/06/2005) LN 0010 BIOMEDE

Shyy, Wei

165

Operational test report for LERF Basin 242AL-44 integrity test  

SciTech Connect (OSTI)

This operational test report documents the results of LERF operational testing per operational test procedure (OTP) TFPE-WP-0231, ``LERF Basin Integrity Testing.`` The primary purpose of the OTP was to resolve test exceptions generated as a result of TFPE-WP-0184. The TOP was prepared and performed in accordance with WHC-SD-534-OTP-002, ``Operational Test Plan for the 242-A Evaporator Upgrades and the Liquid Effluent Retention Facility.`` WHC-S-086, ``Specification for Operational Testing of the Liquid Effluent Retention Facility, Basin Integrity Testing,`` identified the test requirements and acceptance criteria. The completed, signed-off test procedure is contained in Appendix A. The test log is contained in Appendix B. Section 2.1 describes all the test exceptions written during performance of the Operational Test Procedure. The test revisions generated during the testing are discussed in Section 2.2. The dispositioned test exception forms are contained in Appendix C.

Galioto, T.M.

1994-11-08T23:59:59.000Z

166

Equipment Operational Requirements  

SciTech Connect (OSTI)

The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

2009-06-11T23:59:59.000Z

167

Software and House Requirements Engineering  

E-Print Network [OSTI]

a requirements engineer who puts her knowledge of software construction together with her creativity to come upSoftware and House Requirements Engineering: Lessons Learned in Combatting Requirements Creep creativity to try to come up with a plan for a house that will meet the customer's requirements. The customer

Berry, Daniel M.

168

Match Pumps to System Requirements  

SciTech Connect (OSTI)

BestPractices Program tip sheet discussing pumping system efficiency matching pumps to system requirements

Not Available

2005-10-01T23:59:59.000Z

169

Verification Testing Test Driven Development Testing with JUnit Verification  

E-Print Network [OSTI]

Verification Testing Test Driven Development Testing with JUnit Verification Any activity should be verified. #12;Verification Testing Test Driven Development Testing with JUnit Approaches to verification 1 Testing 2 Static Analysis · Peer review · Insepction/Walk-through/Structured review · Formal

Peters, Dennis

170

Duct Tape Durability Testing  

SciTech Connect (OSTI)

Duct leakage is a major source of energy loss in residential buildings. Most duct leakage occurs at the connections to registers, plenums, or branches in the duct system. At each of these connections, a method of sealing the duct system is required. Typical sealing methods include tapes or mastics applied around the joints in the system. Field examinations of duct systems have shown that taped seals tend to fail over extended periods of time. The Lawrence Berkeley National Laboratory (LBNL) has been testing sealant durability for several years using accelerated test methods and found that typical duct tape (i.e., cloth-backed tapes with natural rubber adhesives) fails more rapidly than other duct sealants. This report summarizes the results of duct sealant durability testing over two years for four UL 181B-FX listed duct tapes (two cloth tapes, a foil tape and an Oriented Polypropylene (OPP) tape). One of the cloth tapes was specifically developed in collaboration with a tape manufacturer to perform better in our durability testing. The tests involved the aging of common ''core-to-collar joints'' of flexible duct to sheet metal collars. Periodic air leakage tests and visual inspection were used to document changes in sealant performance. After two years of testing, the flex-to-collar connections showed little change in air leakage, but substantial visual degradation from some products. A surprising experimental result was failure of most of the clamps used to mechanically fasten the connections. This indicates that the durability of clamps also need to be addressed ensure longevity of the duct connection. An accelerated test method developed during this study has been used as the basis for an ASTM standard (E2342-03).

Sherman, Max H.; Walker, Iain S.

2004-04-01T23:59:59.000Z

171

Verifying Test Hypotheses -HOL/TestGen Verifying Test Hypotheses -HOL/TestGen  

E-Print Network [OSTI]

Verifying Test Hypotheses - HOL/TestGen Verifying Test Hypotheses - HOL/TestGen An Experiment in Test and Proof Thomas Malcher January 20, 2014 1 / 20 #12;Verifying Test Hypotheses - HOL/TestGen HOL/TestGen Outline Introduction Test Hypotheses HOL/TestGen - Demo Verifying Test Hypotheses Conclusion 2 / 20 #12

172

Microgrid Testing  

SciTech Connect (OSTI)

With the publication of IEEE 1574.4 Guide for Design, Operation, and Integration of Distributed Resource Island Systems with Electric Power Systems, there is an increasing amount of attention on not only the design and operations of microgrids, but also on the proper operation and testing of these systems. This standard provides alternative approaches and good practices for the design, operation, and integration of microgrids. This includes the ability to separate from and reconnect to part of the utility grid while providing power to the islanded power system. This presentation addresses the industry need to develop standardized testing and evaluation procedures for microgrids in order to assure quality operation in the grid connected and islanded modes of operation.

Shirazi, M.; Kroposki, B.

2012-01-01T23:59:59.000Z

173

GEOCHEMICAL TESTING AND MODEL DEVELOPMENT - RESIDUAL TANK WASTE TEST PLAN  

SciTech Connect (OSTI)

This Test Plan describes the testing and chemical analyses release rate studies on tank residual samples collected following the retrieval of waste from the tank. This work will provide the data required to develop a contaminant release model for the tank residuals from both sludge and salt cake single-shell tanks. The data are intended for use in the long-term performance assessment and conceptual model development.

CANTRELL KJ; CONNELLY MP

2010-03-09T23:59:59.000Z

174

Nonproliferation Test and Evaluation Complex - NPTEC  

SciTech Connect (OSTI)

The Nonproliferation Test and Evaluation Complex, or NPTEC, is the world's largest facility for open air testing of hazardous toxic materials and biological simulants. NPTEC is used for testing, experimentation, and training for technologies that require the release of toxic chemicals or biological simulants into the environment.

None

2014-11-10T23:59:59.000Z

175

Nonproliferation Test and Evaluation Complex - NPTEC  

ScienceCinema (OSTI)

The Nonproliferation Test and Evaluation Complex, or NPTEC, is the world's largest facility for open air testing of hazardous toxic materials and biological simulants. NPTEC is used for testing, experimentation, and training for technologies that require the release of toxic chemicals or biological simulants into the environment.

None

2015-01-09T23:59:59.000Z

176

A Capital Market Test of Representativeness  

E-Print Network [OSTI]

A CAPITAL MARKET TEST OF REPRESENTATIVENESS A Dissertation by MOHAMMAD URFAN SAFDAR Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of DOCTOR... OF PHILOSOPHY May 2012 Major Subject: Accounting A Capital Market Test of Representativeness Copyright 2012 Mohammad Urfan Safdar A CAPITAL MARKET TEST OF REPRESENTATIVENESS A Dissertation...

Safdar, Mohammad

2012-07-16T23:59:59.000Z

177

Defect classes - an overdue paradigm for CMOS IC testing  

SciTech Connect (OSTI)

The IC test industry has struggled for more than 30 years to establish a test approach that would guarantee a low defect level to the customer. We propose a comprehensive strategy for testing CMOS ICs that uses defect classes based on measured defect electrical properties. Defect classes differ from traditional fault models. Our defect class approach requires that the test strategy match the defect electrical properties, while fault models require that IC defects match the fault definition. We use data from Sandia Labs failure analysis and test facilities and from public literature. We describe test pattern requirements for each defect class and propose a test paradigm.

Hawkins, C.F. [Univ. of New Mexico, Albuquerque, NM (United States); Soden, J.M.; Righter, A.W. [Sandia National Labs., Albuquerque, NM (United States); Ferguson, F.J. [Univ. of California, Santa Cruz, CA (United States)

1994-09-01T23:59:59.000Z

178

Webinar: Hydrogen Storage Materials Requirements  

Broader source: Energy.gov [DOE]

Video recording and text version of the webinar titled, Hydrogen Storage Materials Requirements, originally presented on June 25, 2013.

179

NDHA REQUIREMENTS FOR FCNS 320 Quantity Food Production  

E-Print Network [OSTI]

of practical food service work experience. CERTIFICATION & TB TEST GUIDELINES Food Sanitation CertificateNDHA REQUIREMENTS FOR FCNS 320 ­ Quantity Food Production OVERVIEW State Of Illinois Food) Skin Test Verification of 100 Hours Completed Work Experience in Food Production Verification

Kostic, Milivoje M.

180

Test plan : reducing soft costs of rooftop solar installations attributed to structural considerations.  

SciTech Connect (OSTI)

This test plan is a document that provides a systematic approach to the planned testing of rooftop structures to determine their actual load carrying capacity. This document identifies typical tests to be performed, the responsible parties for testing, the general feature of the tests, the testing approach, test deliverables, testing schedule, monitoring requirements, and environmental and safety compliance.

Dwyer, Stephen F.

2013-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Prototype to Test WHY prototype to test  

E-Print Network [OSTI]

Prototype to Test METHOD WHY prototype to test HOW to prototype to test Prototyping to test or design space. The fundamental way you test your prototypes is by letting users experience them and react to them. In creating prototypes to test with users you have the opportunity to examine your solution

Prinz, Friedrich B.

182

Testing with JUnit Testing with JUnit  

E-Print Network [OSTI]

Testing with JUnit Testing with JUnit Running a test case: 1 Get the component to a known state (set up). 2 Cause some event (the test case). 3 Check the behaviour. · Record pass/fail · Track statistics · Typically we want to do a lot of test cases so it makes sense to automate. · Test cases

Peters, Dennis

183

Software Quality Assurance Subcommittee : Guidelines for Requirements...  

Broader source: Energy.gov (indexed) [DOE]

Software Quality Assurance Subcommittee : Guidelines for Requirements Management Software Quality Assurance Subcommittee : Guidelines for Requirements Management Requirements...

184

Using large environmental chamber technique for gaseous contaminant removal equipment test  

SciTech Connect (OSTI)

The US Association of Home Appliance Manufacturers (AHAM) has set a voluntary standard for testing the initial dust-removal capacity of portable air cleaners. In the authors` test of portable air cleaners for the local consumer council, the AHAM method was extended to test the initial removal capacity for gaseous phase pollutants. Also, carbon filters` efficiency change over time in toluene removal on a number of air cleaners was tested. In using a large chamber to carry out these tests, the chamber wall adsorption and re-emission effects were experimentally quantified. These tests indicated that a large chamber, with its wall surface adsorption controlled, is simple and robust to use to quantify the initial cleaning capacity for gaseous phase pollutants. Based on these test results, a large chamber method is proposed to test the performance lifetimes of portable air cleaners. The system advantages of the method over the in-duct performance life test methods are that no continuous air-cleaning system is required and that the chamber`s humidity and temperature can be maintained at the desired values more easily with the combination of a unitary dehumidifier and a bubbler system. This paper will present the trial results with portable air cleaner tests and discuss the large environmental chamber techniques.

Niu, J.; Tung, T.C.W.; Chui, V.W.Y. [Hong Kong Polytechnic Univ. (Hong Kong). Dept. of Building Services Engineering

1998-12-31T23:59:59.000Z

185

Managing System of Systems Requirements with a Requirements Screening Group  

SciTech Connect (OSTI)

Figuring out an effective and efficient way to manage not only your Requirements Baseline, but also the development of all your individual requirements during a Programs/Projects Conceptual and Development Life Cycle Stages can be both daunting and difficult. This is especially so when you are dealing with a complex and large System of Systems (SoS) Program with potentially thousands and thousands of Top Level Requirements as well as an equal number of lower level System, Subsystem and Configuration Item requirements that need to be managed. This task is made even more overwhelming when you have to add in integration with multiple requirements development teams (e.g., Integrated Product Development Teams (IPTs)) and/or numerous System/Subsystem Design Teams. One solution for tackling this difficult activity on a recent large System of Systems Program was to develop and make use of a Requirements Screening Group (RSG). This group is essentially a Team made up of co-chairs from the various Stakeholders with an interest in the Program of record that are enabled and accountable for Requirements Development on the Program/Project. The RSG co-chairs, often with the help of individual support team, work together as a Program Board to monitor, make decisions on, and provide guidance on all Requirements Development activities during the Conceptual and Development Life Cycle Stages of a Program/Project. In addition, the RSG can establish and maintain the Requirements Baseline, monitor and enforce requirements traceability across the entire Program, and work with other elements of the Program/Project to ensure integration and coordination.

Ronald R. Barden

2012-07-01T23:59:59.000Z

186

Simulation analysis of a printed circuit board functional test process  

E-Print Network [OSTI]

to determine the source of the bottleneck, a study analyzing the operating capacity of the functional testing area was performed. Specifically, the capacity analysis divided the total time required to test printed circuit boards by the total testing time... with an on-line terminal connected to a mainframe. The mainframe generates the diagnostic tests performed on the boards which pass through the area. Complicating the test procedure is the fact that each test station is capable of testing only specific...

Brinkley, Paul Andrew

1991-01-01T23:59:59.000Z

187

Test procedure for boxed waste assay system  

SciTech Connect (OSTI)

This document, prepared by Los Alamos National Laboratory`s NMT-4 group, details the test methodology and requirements for Acceptance/Qualification testing of a Boxed Waste Assay System (BWAS) designed and constructed by Pajarito Scientific Corporation. Testing of the BWAS at the Plutonium Facility (TA55) at Los Alamos National Laboratory will be performed to ascertain system adherence to procurement specification requirements. The test program shall include demonstration of conveyor handling capabilities, gamma ray energy analysis, and imaging passive/active neutron accuracy and sensitivity. Integral to these functions is the system`s embedded operating and data reduction software.

Wachter, J. [Los Alamos National Lab., NM (United States)

1994-12-07T23:59:59.000Z

188

ANSI Essential Requirements: Due process requirements for American  

E-Print Network [OSTI]

ANSI Essential Requirements: Due process requirements for American National Standards Edition: January 2010 Copyright by the American National Standards Institute (ANSI), 25 West 43rd Street, 4th Floor, New York, New York 10036. This material may be copied without permission from ANSI only

189

Requirements Identification, Analysis and Measurement  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Analysis, and Management adds detail and rigor to the Mission Analysis output by: Refining the initial customer input into formal Customer Requirements Identifying any...

190

RADIOACTIVE MATERIAL PACKAGING TORQUE REQUIREMENTS COMPLIANCE  

SciTech Connect (OSTI)

Shipping containers used to transport radioactive material (RAM) in commerce employ a variety of closure mechanisms. Often, these closure mechanisms require a specific amount of torque be applied to a bolt, nut or other threaded fastener. It is important that the required preload is achieved so that the package testing and analysis is not invalidated for the purpose of protecting the public. Torque compliance is a means of ensuring closure preload, is a major factor in accomplishing the package functions of confinement/containment, sub-criticality, and shielding. This paper will address the importance of applying proper torque to package closures, discuss torque value nomenclature, and present one methodology to ensure torque compliance is achieved.

Watkins, R.; Leduc, D.

2011-03-24T23:59:59.000Z

191

Test Plan: WIPP bin-scale CH TRU waste tests  

SciTech Connect (OSTI)

This WIPP Bin-Scale CH TRU Waste Test program described herein will provide relevant composition and kinetic rate data on gas generation and consumption resulting from TRU waste degradation, as impacted by synergistic interactions due to multiple degradation modes, waste form preparation, long-term repository environmental effects, engineered barrier materials, and, possibly, engineered modifications to be developed. Similar data on waste-brine leachate compositions and potentially hazardous volatile organic compounds released by the wastes will also be provided. The quantitative data output from these tests and associated technical expertise are required by the WIPP Performance Assessment (PA) program studies, and for the scientific benefit of the overall WIPP project. This Test Plan describes the necessary scientific and technical aspects, justifications, and rational for successfully initiating and conducting the WIPP Bin-Scale CH TRU Waste Test program. This Test Plan is the controlling scientific design definition and overall requirements document for this WIPP in situ test, as defined by Sandia National Laboratories (SNL), scientific advisor to the US Department of Energy, WIPP Project Office (DOE/WPO). 55 refs., 16 figs., 19 tabs.

Molecke, M.A.

1990-08-01T23:59:59.000Z

192

Large scale test simulations using the Virtual Environment for Test Optimization (VETO)  

SciTech Connect (OSTI)

The Virtual Environment for Test Optimization (VETO) is a set of simulation tools under development at Sandia to enable test engineers to do computer simulations of tests. The tool set utilizes analysis codes and test information to optimize design parameters and to provide an accurate model of the test environment which aides in the maximization of test performance, training, and safety. Previous VETO effort has included the development of two structural dynamics simulation modules that provide design and optimization tools for modal and vibration testing. These modules have allowed test engineers to model and simulate complex laboratory testing, to evaluate dynamic response behavior, and to investigate system testability. Further development of the VETO tool set will address the accurate modeling of large scale field test environments at Sandia. These field test environments provide weapon system certification capabilities and have different simulation requirements than those of laboratory testing.

Klenke, S.E.; Heffelfinger, S.R.; Bell, H.J.; Shierling, C.L.

1997-10-01T23:59:59.000Z

193

MECHANICAL TEST LAB CAPABILITIES  

E-Print Network [OSTI]

MECHANICAL TEST LAB CAPABILITIES · Static and cyclic testing (ASTM and non-standard) · Impact drop testing · Slow-cycle fatigue testing · High temperature testing to 2500°F · ASTM/ Boeing/ SACMA standard testing · Ability to design and fabricate non-standard test fixtures and perform non-standard tests

194

Test Preparation Options Free Test Prep Websites  

E-Print Network [OSTI]

Test Preparation Options Free Test Prep Websites ACT: http: http://www.collegeboard.com/student/testing/sat/prep_one/test.html http://www.number2.com://testprep.princetonreview.com/CourseSearch/Search.aspx?itemCode=17&productType=F&rid=1&zip=803 02 Test Prep Classes Front Range Community College: Classes

Stowell, Michael

195

Test and Test Equipment Joshua Lottich  

E-Print Network [OSTI]

Test and Test Equipment Joshua Lottich CMPE 640 11/23/05 #12;Testing Verifies that manufactured chip meets design specifications. Cannot test for every potential defect. Modeling defects as faults allows for passing and failing of chips. Ideal test would capture all defects and pass only chips

Patel, Chintan

196

Orion Flight Test Exploration Flight Test-1  

E-Print Network [OSTI]

Orion Flight Test Exploration Flight Test-1 PRESS KIT/December 2014 www.nasa.gov NP-2014-11-020-JSC National Aeronautics and Space Administration #12;#12;Orion Flight Test December 2014 Contents Section Page ........................................................................................... 28 i #12;Orion Flight Test ii December 2014 #12;Orion Flight Test December 2014 Flight Overview

Waliser, Duane E.

197

Humidity requirements in WSCF Laboratories  

SciTech Connect (OSTI)

The purpose of this paper is to develop and document a position on Relative Humidity (RH) requirements in the WSCF Laboratories. A current survey of equipment vendors for Organic, Inorganic and Radiochemical laboratories indicate that 25% - 80% relative humidity may meet the environmental requirements for safe operation and protection of all the laboratory equipment.

Evans, R.A.

1994-10-01T23:59:59.000Z

198

Handbook of Academic Requirements & Procedures  

E-Print Network [OSTI]

Handbook of Academic Requirements & Procedures for the Chemistry/Biotechnology Graduate Program. A detailed account of the academic requirements and procedures is provided for graduate students in chemistry; to promote consistency in procedures and standards; and to provide a basis for communication between

Kounaves, Samuel P.

199

Degree Requirements COLLEGE OF ENGINEERING  

E-Print Network [OSTI]

or better is required in ECON 2000 (Engineering Economics), Philosophy 2244 (Engineering Ethics), and ENGLDegree Requirements COLLEGE OF ENGINEERING B.S. in Electrical Engineering Effective Date: 08) 6 Total 30 MUST SELECT ONE Computer Engineering Concentration Course Name/ # Credit Hours Course

Kulp, Mark

200

Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -the Mid-Infrared at 278, 298,NIST31 ORVEnergy Request ForForms of1, 2

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Part B - Requirements & Funding Information PART B - Requirements...  

Energy Savers [EERE]

to support the determinations and findings (D&F) required by FAR 17.502-2 to the contracting officer. Provide this information as an attachment or coordinate with the...

202

acoustic impedance tests: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DETAILS Engineering Websites Summary: no electrical connection, and requires a lift bucket for access, a new approach was needed to enable AE testing Figure 2: Weatherproof...

203

In Plane Conductivity Testing, BekkTech LLC  

Broader source: Energy.gov (indexed) [DOE]

skill and equipment required than making and testing a good MEA * Eliminates other fuel cell performance factors * Allows for an isolation of moving charge, not creation or...

204

Design of SystemonaChip Test Access Architectures using Integer Linear Programming 1  

E-Print Network [OSTI]

integration. An ef­ ficient test access architecture should reduce test cost and time­to­market by minimizing. In order to reduce test cost and shorten short time­to­ market, the testing time for an SOC should) For a given test access architecture, how much test data bandwidth is required to meet specified testing time

Chakrabarty, Krishnendu

205

A Regression Test Selection Technique for Graphical User Interfaces  

E-Print Network [OSTI]

Regression testing is a quality control measure to ensure that the newly modified part of the software still complies with its specified requirements and that the unmodified part has not been affected by the maintenance activity. Regression testing...

Chesser, Carl

2012-08-31T23:59:59.000Z

206

Vaccine refrigerator testing. Final report  

SciTech Connect (OSTI)

For the Central American Health Clinic Project initiated in 1986, Sandia National Laboratories and the Florida Solar Energy Center recognized the need for a test and evaluation program for vaccine refrigeration systems. At the Florida Solar Energy Center, side-by-side testing of three photovoltaic powered vaccine refrigerators began in 1987. The testing was expanded in 1988 to include a kerosene absorption refrigerator. This report presents observations, conclusions, and recommendations derived from testing the four vaccine refrigeration systems. Information is presented pertaining to the refrigerators, photovoltaic arrays, battery subsystems, charge controllers, and user requirements. This report should be of interest to designers, manufacturers, installers, and users of photovoltaic-powered vaccine refrigeration systems and components.

Ventre, G.G. [Univ. of Central Florida, Orlando, FL (United States); Kilfoyle, D.; Marion, B. [Florida Solar Energy Center, Cape Canaveral, FL (United States)

1990-06-01T23:59:59.000Z

207

Baseline LAW Glass Formulation Testing  

SciTech Connect (OSTI)

The major objective of the baseline glass formulation work was to develop and select glass formulations that are compliant with contractual and processing requirements for each of the LAW waste streams. Other objectives of the work included preparation and characterization of glasses with respect to the properties of interest, optimization of sulfate loading in the glasses, evaluation of ability to achieve waste loading limits, testing to demonstrate compatibility of glass melts with melter materials of construction, development of glass formulations to support ILAW qualification activities, and identification of glass formulation issues with respect to contract specifications and processing requirements.

Kruger, Albert A. [USDOE Office of River Protection, Richland, WA (United States); Mooers, Cavin [The Catholic University of America, Washington, DC (United States). Vitreous State Lab.; Bazemore, Gina [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Pegg, Ian L. [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Hight, Kenneth [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Lai, Shan Tao [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Buechele, Andrew [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Rielley, Elizabeth [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Gan, Hao [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Muller, Isabelle S. [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Cecil, Richard [The Catholic University of America, Washington, DC (United States). Vitreous State Lab

2013-06-13T23:59:59.000Z

208

Fusion technology status and requirements  

SciTech Connect (OSTI)

This paper summarizes the status of fusion technology and discusses the requirements to be met in order to build a demonstration fusion plant. Strategies and programmatic considerations in pursuing engineering feasibility are also outlined.

Thomassen, K.I.

1982-01-26T23:59:59.000Z

209

Meeting Federal Energy Security Requirements  

Broader source: Energy.gov [DOE]

Presentationgiven at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meetingdiscusses the opportunity to increase the scope of federal-utility partnerships for meeting energy security requirements.

210

Nevada Test Site Waste Acceptance Criteria (NTSWAC)  

SciTech Connect (OSTI)

This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, Nevada Test Site Waste Acceptance Criteria (NTSWAC). The NTSWAC provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive (LLW) and LLW Mixed Waste (MW) for disposal.

NNSA /NSO Waste Management Project

2008-06-01T23:59:59.000Z

211

Calibration curves for some standard Gap Tests  

SciTech Connect (OSTI)

The relative shock sensitivities of explosive compositions are commonly assessed using a family of experiments that can be described by the generic term ''Gap Test.'' Gap tests include a donor charge, a test sample, and a spacer, or gap, between two explosives charges. The donor charge, gap material, and test dimensions are held constant within each different version of the gap test. The thickness of the gap is then varied to find the value at which 50% of the test samples will detonate. The gap tests measure the ease with a high-order detonation can be established in the test explosive, or the ''detonability,'' of the explosive. Test results are best reported in terms of the gap thickness at the 50% point. It is also useful to define the shock pressure transmitted into the test sample at the detonation threshold. This requires calibrating the gap test in terms of shock pressure in the gap as a function of the gap thickness. It also requires a knowledge of the shock Hugoniot of the sample explosive. We used the 2DE reactive hydrodynamic code with Forest Fire burn rates for the donor explosives to calculate calibration curves for several gap tests. The model calculations give pressure and particle velocity on the centerline of the experimental set-up and provide information about the curvature and pulse width of the shock wave. 10 refs., 1 fig.

Bowman, A.L.; Sommer, S.C.

1989-01-01T23:59:59.000Z

212

Dynamic Response Testing in an Electrically Heated Reactor Test Facility  

SciTech Connect (OSTI)

Non-nuclear testing can be a valuable tool in the development of a space nuclear power or propulsion system. In a non-nuclear test bed, electric heaters are used to simulate the heat from nuclear fuel. Standard testing allows one to fully assess thermal, heat transfer, and stress related attributes of a given system, but fails to demonstrate the dynamic response that would be present in an integrated, fueled reactor system. The integration of thermal hydraulic hardware tests with simulated neutronic response provides a bridge between electrically heated testing and fueled nuclear testing. By implementing a neutronic response model to simulate the dynamic response that would be expected in a fueled reactor system, one can better understand system integration issues, characterize integrated system response times and response characteristics, and assess potential design improvements at a relatively small fiscal investment. Initial system dynamic response testing was demonstrated on the integrated SAFE-100a heat pipe (HP) cooled, electrically heated reactor and heat exchanger hardware, utilizing a one-group solution to the point kinetics equations to simulate the expected neutronic response of the system. Reactivity feedback calculations were then based on a bulk reactivity feedback coefficient and measured average core temperature. This paper presents preliminary results from similar dynamic testing of a direct drive gas cooled reactor system (DDG), demonstrating the applicability of the testing methodology to any reactor type and demonstrating the variation in system response characteristics in different reactor concepts. Although the HP and DDG designs both utilize a fast spectrum reactor, the method of cooling the reactor differs significantly, leading to a variable system response that can be demonstrated and assessed in a non-nuclear test facility. Planned system upgrades to allow implementation of higher fidelity dynamic testing are also discussed. Proposed DDG testing will utilize a higher fidelity point kinetics model to control core power transients, and reactivity feedback will be based on localized feedback coefficients and several independent temperature measurements taken within the core block. This paper presents preliminary test results and discusses the methodology that will be implemented in follow-on DDG testing and the additional instrumentation required to implement high fidelity dynamic testing.

Bragg-Sitton, Shannon M. [NASA Marshall Space Flight Center, Nuclear and Advanced Propulsion Branch, ER-11, MSFC, AL 35812 (United States); Morton, T. J. [Department of Chemical and Nuclear Engineering, University of New Mexico, Albuquerque, NM 87131 (United States)

2006-01-20T23:59:59.000Z

213

Design, fabrication and testing of a bearing test rig and preliminary studies on oil mist lubrication  

E-Print Network [OSTI]

DESIGN, FABRICATION AND TESTING OF A BEARING TEST RIG AND PRELIMINARY STUDIES ON OIL MIST LUBRICATION A Thesis by ABDUS SHAMIM Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements... for the degree of MASTER OF SCIENCE August 1990 Major Subject: Mechanical Engineering DESIGN, FABRICATION AND TESTING OF A BEARING TEST RIG AND PRELIMINARY STUDIES ON OIL MIST LUBRICATION A Thesis by ABDUS SHAMIM Approved as to style and content by: C...

Shamim, Abdus

1990-01-01T23:59:59.000Z

214

Hydrates detection by cone penetration testing: cone penetration tests through ice layers  

E-Print Network [OSTI]

HYDRATES DETECTION BY CONE PENETRATION TESTING: PART I: CONE PENETRATION TESTS THROUGH ICE LAYERS A Thesis by PHILIPPE HENRI JEANJEAN Submitted to the Office of Graduate Studies of Texas ABcM University in partial fulfillment... of the requirement for the degree of MASTER OF SCIENCE May 1991 Major Subject: Civil Engineering HYDRATES DETECTION BY CONE PENETRATION TESTING: PART I: CONE PENETRATION TESTS THROUGH ICE LAYERS A Thesis by PHILIPPE HENRI JEANJEAN Approved as to style...

Jeanjean, Philippe Henri

1991-01-01T23:59:59.000Z

215

Past Test One  

E-Print Network [OSTI]

MA 366: Introduction to Di?'erential Equations. Fall 2001, Test One. Instructor: Yip o This test booklet has FIVE QUESTIONS, totaling 50 points for the whole test.

216

Test Advising Framework.  

E-Print Network [OSTI]

??Test cases are represented in various formats depending on the process, the technique or the tool used to generate the tests. While different test case (more)

Wang, Yurong

2013-01-01T23:59:59.000Z

217

Directed Test Suite Augmentation.  

E-Print Network [OSTI]

??Test suite augmentation techniques are used in regression testing to identify code elements affected by changes and to generate test cases to cover those elements. (more)

Xu, Zhihong

2013-01-01T23:59:59.000Z

218

Non-Adaptive Complex Group Testing with Multiple Positive Sets  

E-Print Network [OSTI]

Non-Adaptive Complex Group Testing with Multiple Positive Sets Francis Y.L. Chin, Henry C.M. Leung Given n items with at most d of them having a particular property (referred as positive items), a test-adaptive group testing problem is to design how to group the items to minimize the number of tests required

Chin, Francis Y.L.

219

Automated Black-Box Testing with Abstract VDM Oracles  

E-Print Network [OSTI]

as test oracles for concrete software. The automation of the resulting testing frame-work is based of a target system. For that reason, a mapping between abstract and concrete test data is requiredAutomated Black-Box Testing with Abstract VDM Oracles Bernhard K. Aichernig Technical University

220

Advanced Vehicle Testing - Beginning-of-Test Battery Testing...  

Broader source: Energy.gov (indexed) [DOE]

2.5 V Thermal Mgmt.: Passive, Vacuum-Sealed Unit Pack Weight: 294 kg BATTERY LABORATORY TEST RESULTS SUMMARY Vehicle Mileage and Testing Date Vehicle Odometer: 6,696 mi Date of...

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Phase Startup Initiative Phases 3 and 4 Test Plan and Test Specification ( OCRWM)  

SciTech Connect (OSTI)

Construction for the Spent Nuclear Fuel (SNF) Project facilities is continuing per the Level III Baseline Schedule, and installation of the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) in K West Basin is now complete. In order to accelerate the project, a phased start up strategy to initiate testing of the FRS and IWTS early in the overall project schedule was proposed (Williams 1999). Wilkinson (1999) expands the definition of the original proposal into four functional testing phases of the Phased Startup Initiative (PSI). Phases 1 and 2 are based on performing functional tests using dummy fuel. This test plan provides overall guidance for Phase 3 and 4 tests, which are performed using actual irradiated N fuel assemblies. The overall objective of the Phase 3 and 4 testing is to verify how the FRS and IWTS respond while processing actual fuel. Conducting these tests early in the project schedule will allow identification and resolution of equipment and process problems before they become activities on the start-up critical path. The specific objectives of this test plan are to: Define the Phase 3 and 4 test scope for the FRS and IWTS; Provide detailed test requirements that can be used to write the specific test procedures; Define data required and measurements to be taken. Where existing methods to obtain these do not exist, enough detail will be provided to define required additional equipment; and Define specific test objectives and acceptance criteria.

PAJUNEN, A.L.; LANGEVIN, M.J.

2000-08-07T23:59:59.000Z

222

Romanian experience on packaging testing  

SciTech Connect (OSTI)

With more than twenty years ago, the Institute for Nuclear Research Pitesti (INR), through its Reliability and Testing Laboratory, was licensed by the Romanian Nuclear Regulatory Body- CNCAN and to carry out qualification tests [1] for packages intended to be used for the transport and storage of radioactive materials. Radioactive materials, generated by Romanian nuclear facilities [2] are packaged in accordance with national [3] and the IAEA's Regulations [1,6] for a safe transport to the disposal center. Subjecting these packages to the normal and simulating test conditions accomplish the evaluation and certification in order to prove the package technical performances. The paper describes the qualification tests for type A and B packages used for transport and storage of radioactive materials, during a period of 20 years of experience. Testing is used to substantiate assumption in analytical models and to demonstrate package structural response. The Romanian test facilities [1,3,6] are used to simulate the required qualification tests and have been developed at INR Pitesti, the main supplier of type A packages used for transport and storage of low radioactive wastes in Romania. The testing programme will continue to be a strong option to support future package development, to perform a broad range of verification and certification tests on radioactive material packages or component sections, such as packages used for transport of radioactive sources to be used for industrial or medical purposes [2,8]. The paper describes and contain illustrations showing some of the various tests packages which have been performed during certain periods and how they relate to normal conditions and minor mishaps during transport. Quality assurance and quality controls measures taken in order to meet technical specification provided by the design there are also presented and commented. (authors)

Vieru, G. [IAEA Technical Expert, Head, Reliability and Testing Lab., Institute for Nuclear Research (Romania)

2007-07-01T23:59:59.000Z

223

IFE chamber technology testing program in NIF and chamber development test plan  

SciTech Connect (OSTI)

Issues concerning chamber technology testing program in NIF involving: criteria for evaluation/prioritization of experiments, engineering scaling requirements for test article design and material selection and R and D plan prior to NIF testing were addressed in this paper. In order to maximize the benefits of testing program in NIF, the testing in NIF should provide the experimental data relevant to DEMO design choice or to DEMO design predictive capability by utilizing engineering scaling test article designs. Test plans were developed for 2 promising chamber design concepts. Early testing in non-fusion/non-ignition prior to testing in ignition facility serves a critical role in chamber R and D test plans in order to reduce the risks and costs of the more complex experiments in NIF.

Abdou, M.A. [Univ. of California, Los Angeles, CA (United States)

1995-12-31T23:59:59.000Z

224

Introduction Statistical Tests  

E-Print Network [OSTI]

Introduction Statistical Tests Experiment Summary Statistical Significance Testing Machine Learning Lab, ASU Surendra Singhi April 29, 2005 Surendra Singhi Statistical Significance Testing #12;Introduction Statistical Tests Experiment Summary Outline 1 Introduction Preliminary Stuff Sources of Variation

Liu, Huan

225

Testing dynamically reconfigurable FPGAs  

E-Print Network [OSTI]

In this work, testing methods are proposed to test the ics. logic resources and the interconnect structure of dynamically reconfigurable FPGAS. Testing methods are also proposed for testing the dedicated CPU interface in these FPGAS. A BIST...

Ruiwale, Sameer Jagadish

1998-01-01T23:59:59.000Z

226

Bull Test ID 1140 2013 Florida Bull Test  

E-Print Network [OSTI]

Bull Test ID 1140 2013 Florida Bull Test #12;Bull Test ID 1141 2013 Florida Bull Test #12;Bull Test ID 1142 2013 Florida Bull Test #12;Bull Test ID 1143 2013 Florida Bull Test #12;Bull Test ID 1144 2013 Florida Bull Test #12;Bull Test ID 1145 2013 Florida Bull Test #12;Bull Test ID 1146 2013 Florida

Jawitz, James W.

227

Bull Test ID 1098 2013 Florida Bull Test  

E-Print Network [OSTI]

Bull Test ID 1098 2013 Florida Bull Test #12;Bull Test ID 1099 2013 Florida Bull Test #12;Bull Test ID 1100 2013 Florida Bull Test #12;Bull Test ID 1101 2013 Florida Bull Test #12;Bull Test ID 1102 2013 Florida Bull Test #12;Bull Test ID 1103 2013 Florida Bull Test #12;Bull Test ID 1104 2013 Florida

Jawitz, James W.

228

Bull Test ID 1181 2013 Florida Bull Test  

E-Print Network [OSTI]

Bull Test ID 1181 2013 Florida Bull Test #12;Bull Test ID 1182 2013 Florida Bull Test #12;Bull Test ID 1183 2013 Florida Bull Test #12;Bull Test ID 1184 2013 Florida Bull Test #12;Bull Test ID 1185 2013 Florida Bull Test #12;Bull Test ID 1186 2013 Florida Bull Test #12;Bull Test ID 1187 2013 Florida

Jawitz, James W.

229

Bull Test ID 1160 2013 Florida Bull Test  

E-Print Network [OSTI]

Bull Test ID 1160 2013 Florida Bull Test #12;Bull Test ID 1161 2013 Florida Bull Test #12;Bull Test ID 1162 2013 Florida Bull Test #12;Bull Test ID 1163 2013 Florida Bull Test #12;Bull Test ID 1164 2013 Florida Bull Test #12;Bull Test ID 1165 2013 Florida Bull Test #12;Bull Test ID 1166 2013 Florida

Jawitz, James W.

230

Bull Test ID 1118 2013 Florida Bull Test  

E-Print Network [OSTI]

Bull Test ID 1118 2013 Florida Bull Test #12;Bull Test ID 1119 2013 Florida Bull Test #12;Bull Test ID 1120 2013 Florida Bull Test #12;Bull Test ID 1121 2013 Florida Bull Test #12;Bull Test ID 1122 2013 Florida Bull Test #12;Bull Test ID 1123 2013 Florida Bull Test #12;Bull Test ID 1124 2013 Florida

Jawitz, James W.

231

Bull Test ID 1077 2013 Florida Bull Test  

E-Print Network [OSTI]

14th Annual Florida Bull Test #12;Bull Test ID 1077 2013 Florida Bull Test #12;Bull Test ID 1078 2013 Florida Bull Test #12;Bull Test ID 1079 2013 Florida Bull Test #12;Bull Test ID 1080 2013 Florida Bull Test #12;Bull Test ID 1081 2013 Florida Bull Test #12;Bull Test ID 1082 2013 Florida Bull Test #12

Jawitz, James W.

232

LCLS Heavy Met Outgassing Tests  

SciTech Connect (OSTI)

A Heavy Met that is 95% tungsten, 3% nickel and 2% iron and sintered to 100% density and is Ultra High Vacuum (UHV) compatible is proposed for use as the X-ray slit in the Front End Enclosure and the Fixed Mask for the Linac Coherent Light Source (LCLS). The Heavy Met was tested in the LLNL Vacuum Sciences and Engineering Lab (VSEL) to determine its outgassing rate and its overall compatibility with the vacuum requirements for LCLS.

Kishiyama, K. I.

2010-12-01T23:59:59.000Z

233

Unit Testing Discussion C  

E-Print Network [OSTI]

Unit Testing Discussion C #12;Unit Test public Method is smallest unit of code Input/output transformation Test if the method does what it claims Not exactly black box testing #12;Test if (actual result Expected Computed Input #12;Functionality Computation ­ Easy to test Time based Asynchronous interaction

Massachusetts at Amherst, University of

234

Concolic Testing Koushik Sen  

E-Print Network [OSTI]

Concolic testing automates test input generation by com­ bining the concrete and symbolic (concolic) execution of the code under test. Traditional test input generation tech­ niques use either (1) concrete test inputs from these constraints. In contrast, concolic testing tightly couples both concrete

Sen, Koushik

235

Concolic Testing Koushik Sen  

E-Print Network [OSTI]

Concolic testing automates test input generation by com- bining the concrete and symbolic (concolic) execution of the code under test. Traditional test input generation tech- niques use either (1) concrete test inputs from these constraints. In contrast, concolic testing tightly couples both concrete

Sen, Koushik

236

Network Requirements Workshop - Documents and Background Materials  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Science Requirements Reviews Network Requirements Reviews Documents and Background Materials Science Engagement Move your data Programs & Workshops Science...

237

SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Requirements...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Requirements Management Checklist SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Requirements Management Checklist The following checklist is intended to provide system owners,...

238

HEAT Loan Minimum Standards and Requirements  

Broader source: Energy.gov [DOE]

Presents additional resources on loan standards and requirements from Elise Avers' presentation on HEAT Loan Minimum Standards and Requirements.

239

Johnson Noise Thermometry System Requirements  

SciTech Connect (OSTI)

This document is intended to capture the requirements for the architecture of the developmental electronics for the ORNL-lead drift-free Johnson Noise Thermometry (JNT) project conducted under the Instrumentation, Controls, and Human-Machine Interface (ICHMI) research pathway of the U.S. Department of Energy (DOE) Advanced Small Modular Reactor (SMR) Research and Development (R&D) program. The requirements include not only the performance of the system but also the allowable measurement environment of the probe and the allowable physical environment of the associated electronics. A more extensive project background including the project rationale is available in the initial project report [1].

Britton Jr, Charles L [ORNL; Roberts, Michael [ORNL; Ezell, N Dianne Bull [ORNL; Qualls, A L [ORNL; Holcomb, David Eugene [ORNL

2013-01-01T23:59:59.000Z

240

Radioactive material package seal tests  

SciTech Connect (OSTI)

General design or test performance requirements for radioactive materials (RAM) packages are specified in Title 10 of the US Code of Federal Regulations Part 71 (US Nuclear Regulatory Commission, 1983). The requirements for Type B packages provide a broad range of environments under which the system must contain the RAM without posing a threat to health or property. Seals that provide the containment system interface between the packaging body and the closure must function in both high- and low-temperature environments under dynamic and static conditions. A seal technology program, jointly funded by the US Department of Energy Office of Environmental Restoration and Waste Management (EM) and the Office of Civilian Radioactive Waste Management (OCRWM), was initiated at Sandia National Laboratories. Experiments were performed in this program to characterize the behavior of several static seal materials at low temperatures. Helium leak tests on face seals were used to compare the materials. Materials tested include butyl, neoprene, ethylene propylene, fluorosilicone, silicone, Eypel, Kalrez, Teflon, fluorocarbon, and Teflon/silicone composites. Because most elastomer O-ring applications are for hydraulic systems, manufacturer low-temperature ratings are based on methods that simulate this use. The seal materials tested in this program with a fixture similar to a RAM cask closure, with the exception of silicone S613-60, are not leak tight (1.0 {times} 10{sup {minus}7} std cm{sup 3}/s) at manufacturer low-temperature ratings. 8 refs., 3 figs., 1 tab.

Madsen, M.M.; Humphreys, D.L.; Edwards, K.R.

1990-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Computer Science Graduation Requirements Checklist  

E-Print Network [OSTI]

Computer Science Graduation Requirements Checklist ­ Fall 2008 Computer Science Courses Course Gr. Sem. Comments CSE 114 Computer Science I [prerequisite: CSE 110] CSE 214 Computer Science II CSE 215 Foundations of Computer Science CSE 219 Computer Science III CSE 220 Computer Organization CSE 300 Writing

Zadok, Erez

242

Computer Science Graduation Requirements Checklist  

E-Print Network [OSTI]

Computer Science Graduation Requirements Checklist ­ Fall 2009 Computer Science Courses Course Gr. Sem. Comments CSE 114 Computer Science I [prerequisite: CSE 110] CSE 214 Computer Science II CSE 215 Foundations of Computer Science CSE 219 Computer Science III CSE 220 Computer Organization CSE 300 Writing

Zadok, Erez

243

Handbook of Academic Requirements & Procedures  

E-Print Network [OSTI]

Handbook of Academic Requirements & Procedures for the Chemistry Graduate Program PLEASE NOTE and procedures is provided. The intent is to describe the programs and explain the rationale behind them of the Department; to promote consistency in procedures and standards; and to provide a basis for communication

Kounaves, Samuel P.

244

AMS vs. NWS: Educational Requirements  

E-Print Network [OSTI]

· Reconstruction of past climates · Climate models · Causes of past and future climate change #12;Capstone methods · Oral, written, and multimedia communication ­ Ability to create and deliver scientific ­ Ability to effectively communicate with technical and lay audiences using scientific evidence #12;Required

245

DEGREE REQUIREMENTS BIOLOGICAL ENGINEERING TECHNOLOGY  

E-Print Network [OSTI]

DEGREE REQUIREMENTS BIOLOGICAL ENGINEERING TECHNOLOGY ENVIRONMENTAL ENGINEERING TECHNOLOGY The curriculum in the technology programs must satisfy the College of Agriculture and Life Sciences (CALS for the technology programs are listed by subject matter in three major categories: (A) Basic Subjects, (B) Advanced

Walter, M.Todd

246

Documentation Requirements for Learning Disabilities  

E-Print Network [OSTI]

Documentation Requirements for Learning Disabilities Students, faculty, staff, and campus guests wishing to request accommodations due to learning disabilities should refer to the following documentation of interest. C) Documentation must be typed, dated, signed by the evaluator and submitted to ODR

247

Page 1 of 8 POULTRY HEALTH REQUIREMENTS FOR ADMISSION TO  

E-Print Network [OSTI]

Page 1 of 8 POULTRY HEALTH REQUIREMENTS FOR ADMISSION TO MARYLAND FAIRS AND SHOWS - 2005 N. G@mda.state.md.us 1. What are the regulations on Avian Influenza testing? · Poultry must come from flocks that participate in the U.S. National Poultry Improvement Plan Certified Avian Influenza-Free Program (Sample

Hamza, Iqbal

248

Long-term corrosion testing pan.  

SciTech Connect (OSTI)

This document describes the testing and facility requirements to support the Yucca Mountain Project long-term corrosion testing needs. The purpose of this document is to describe a corrosion testing program that will (a) reduce model uncertainty and variability, (b) reduce the reliance upon overly conservative assumptions, and (c) improve model defensibility. Test matrices were developed for 17 topical areas (tasks): each matrix corresponds to a specific test activity that is a subset of the total work performed in a task. A future document will identify which of these activities are considered to be performance confirmation activities. Detailed matrices are provided for FY08, FY09 and FY10 and rough order estimates are provided for FY11-17. Criteria for the selection of appropriate test facilities were developed through a meeting of Lead Lab and DOE personnel on October 16-17, 2007. These criteria were applied to the testing activities and recommendations were made for the facility types appropriate to carry out each activity. The facility requirements for each activity were assessed and activities were identified that can not be performed with currently available facilities. Based on this assessment, a total of approximately 10,000 square feet of facility space is recommended to meet all future testing needs, given that all testing is consolidated to a single location. This report is a revision to SAND2007-7027 to address DOE comments and add a series of tests to address NWTRB recommendations.

Wall, Frederick Douglas; Brown, Neil R. (Los Alamos National Laboratory, Los Alamos, NM)

2008-08-01T23:59:59.000Z

249

AMI FW UPGRADEABILITY TEST PROCEDURE AND SECURITY ASSESSMENT  

SciTech Connect (OSTI)

The National Institute of Standards and Technology (NIST) is producing NISTIR 7823 to define test requirements for Smart Meter upgradability. The term Smart Meter refers specifically to advanced electric meters being deployed to enhance management of electricity distribution for residential and industrial consumers. The underlying functional and security requirements for Smart Meter upgradability are specified in NEMA standard SG-AMI 1-2009. The purpose of NISTIR 7823 is to describe conformance test requirements that may be used voluntarily by testers and/or test laboratories to determine whether Smart Meters and Upgrade Management Systems conform to the requirements of NEMA SG-AMI 1-2009.

Snyder, Isabelle B [ORNL] [ORNL

2014-01-01T23:59:59.000Z

250

Model-based testing in the automotive industry challenges and solutions  

E-Print Network [OSTI]

Test specification System integration testing ­ model-based Test executionTest model Documentation... Requirements System integration testing ­ model-based SUT Sensors/busses Input interfaces Actors/busses Output interfaces #12;9 Overview 1. Model-based system integration testing 2. Integrating external models in the HW

Peleska, Jan - Fachbereich 3

251

Test specification for decant pump and winch assembly. Revision 2  

SciTech Connect (OSTI)

This specification provides the requirements for testing of the vertical turbine decant pump including the floating suction with load sensing winch control, instrumentation and the associated PLC/PC control system. All assembly necessary for testing including piping, temporary wiring, etc., shall be performed by the Seller. All referenced figures are at the back of this document. The testing consists of performance testing, winch testing and calibration, instrumentation verification testing and run-in testing of the pump. Testing shall be done in the presence and under the direction of the Buyer in accordance with this procedure.

Staehr, T.W.

1995-02-22T23:59:59.000Z

252

Pressure Change Measurement Leak Testing Errors  

SciTech Connect (OSTI)

A pressure change test is a common leak testing method used in construction and Non-Destructive Examination (NDE). The test is known as being a fast, simple, and easy to apply evaluation method. While this method may be fairly quick to conduct and require simple instrumentation, the engineering behind this type of test is more complex than is apparent on the surface. This paper intends to discuss some of the more common errors made during the application of a pressure change test and give the test engineer insight into how to correctly compensate for these factors. The principals discussed here apply to ideal gases such as air or other monoatomic or diatomic gasses; however these same principals can be applied to polyatomic gasses or liquid flow rate with altered formula specific to those types of tests using the same methodology.

Pryor, Jeff M [ORNL] [ORNL; Walker, William C [ORNL] [ORNL

2014-01-01T23:59:59.000Z

253

Fuels from microalgae: Technology status, potential, and research requirements  

SciTech Connect (OSTI)

Although numerous options for the production of fuels from microalgae have been proposed, our analysis indicates that only two qualify for extensive development - gasoline and ester fuel. In developing the comparisons that support this conclusion, we have identified the major areas of microalgae production and processing that require extensive development. Technology success requires developing and testing processes that fully utilize the polar and nonpolar lipids produced by microalgae. Process designs used in these analyses were derived from fragmented, preliminary laboratory data. These results must be substantiated and integrated processes proposed, tested, and refined to be able to evaluate the commercial feasibility from microalgae. The production of algal feedstocks for processing to gasoline or ester fuel requires algae of high productivity and high lipid content that efficiently utilize saline waters. Species screening and development suggest that algae can achieve required standards taken individually, but algae that can meet the integrated requirements still elude researchers. Effective development of fuels from microalgae technology requires that R and D be directed toward meeting the integrated standards set out in the analysis. As technology analysts, it is inappropriate for us to dictate how the R and D effort should proceed to meet these standards. We end our role by noting that alternative approaches to meeting the feasibility targets have been identified, and it is now the task of program managers and scientists to choose the appropriate approach to assure the greatest likelihood of realizing a commercially viable technology. 70 refs., 39 figs., 35 tabs.

Neenan, B.; Feinberg, D.; Hill, A.; McIntosh, R.; Terry, K.

1986-08-01T23:59:59.000Z

254

TMACS test procedure TP001: Alarm management. Revision 6  

SciTech Connect (OSTI)

The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the Alarm Management requirements of the TMACS. The features to be tested are: real-time alarming on high and low level and discrete alarms, equipment alarms, dead-band filtering, alarm display color coding, alarm acknowledgement, and alarm logging.

Scanlan, P.K.

1994-09-01T23:59:59.000Z

255

Dual-Axis Resonance Testing of Wind Turbine Blades  

Energy Innovation Portal (Marketing Summaries) [EERE]

Wind turbine blades must undergo strength and fatigue testing in order to be rated and marketed appropriately. Presently, wind turbine blades are fatigue-tested in the flapwise direction and in the edgewise direction independently. This testing involves placing the blades through 1 to 10 million or more load or fatigue cycles, which may take 3 to 12 months or more to complete for each tested direction. There is a need for blade testing techniques that are less expensive to use and require...

2014-07-28T23:59:59.000Z

256

Advanced Thermal Simulator Testing: Thermal Analysis and Test Results  

SciTech Connect (OSTI)

Work at the NASA Marshall Space Flight Center seeks to develop high fidelity, electrically heated thermal simulators that represent fuel elements in a nuclear reactor design to support non-nuclear testing applicable to the potential development of a space nuclear power or propulsion system. Comparison between the fuel pins and thermal simulators is made at the outer fuel clad surface, which corresponds to the outer sheath surface in the thermal simulator. The thermal simulators that are currently being tested correspond to a liquid metal cooled reactor design that could be applied for Lunar surface power. These simulators are designed to meet the geometric and power requirements of a proposed surface power reactor design, accommodate testing of various axial power profiles, and incorporate imbedded instrumentation. This paper reports the results of thermal simulator analysis and testing in a bare element configuration, which does not incorporate active heat removal, and testing in a water-cooled calorimeter designed to mimic the heat removal that would be experienced in a reactor core.

Bragg-Sitton, Shannon M.; Dickens, Ricky; Dixon, David; Reid, Robert; Adams, Mike; Davis, Joe [NASA Marshall Space Flight Center, Nuclear Systems Branch/ER24, MSFC, AL 35812 (United States)

2008-01-21T23:59:59.000Z

257

Velocity requirements for causality violation  

E-Print Network [OSTI]

We re-examine the "Regge-Tolman paradox" with reference to some recent experimental results. It is straightforward to find a formula for the velocity v of the moving system required to produce causality violation. This formula typically yields a velocity very close to the speed of light (for instance, v/c > 0.97 for X-shaped microwaves), which raises some doubts about the real physical observability of the violations. We then compute the velocity requirement introducing a delay between the reception of the primary signal and the emission of the secondary. It turns out that in principle for any delay it is possible to find moving observers able to produce active causal violation. This is mathematically due to the singularity of the Lorentz transformations for beta to 1. For a realistic delay due to the propagation of a luminal precursor, we find that causality violations in the reported experiments are still more unlikely (v/c > 0.989), and even in the hypothesis that the superluminal propagation velocity goes to infinity, the velocity requirement is bounded by v/c > 0.62. We also prove that if two macroscopic bodies exchange energy and momentum through superluminal signals, then the swap of signal source and target is incompatible with the Lorentz transformations; therefore it is not possible to distinguish between source and target, even with reference to a definite reference frame.

Giovanni Modanese

2015-01-18T23:59:59.000Z

258

Defect Prevention and Detection in Software for Automated Test Equipment  

SciTech Connect (OSTI)

Software for automated test equipment can be tedious and monotonous making it just as error-prone as other software. Active defect prevention and detection are also important for test applications. Incomplete or unclear requirements, a cryptic syntax used for some test applicationsespecially script-based test sets, variability in syntax or structure, and changing requirements are among the problems encountered in one tester. Such problems are common to all software but can be particularly problematic in test equipment software intended to test another product. Each of these issues increases the probability of error injection during test application development. This report describes a test application development tool designed to address these issues and others for a particular piece of test equipment. By addressing these problems in the development environment, the tool has powerful built-in defect prevention and detection capabilities. Regular expressions are widely used in the development tool as a means of formally defining test equipment requirements for the test application and verifying conformance to those requirements. A novel means of using regular expressions to perform range checking was developed. A reduction in rework and increased productivity are the results. These capabilities are described along with lessons learned and their applicability to other test equipment software. The test application development tool, or application builder, is known as the PT3800 AM Creation, Revision and Archiving Tool (PACRAT).

E. Bean

2006-11-30T23:59:59.000Z

259

Final Report - LAW Envelope A and B Glass Formulations Testing in Increase Waste Loading. VSL-06R6900-1  

SciTech Connect (OSTI)

This report describes the results of testing specified by the Test Plan VSL-06R6900-1 Rev 0. The work was performed in compliance with quality assurance requirements specified in the Test Plan. Results required by the Test Plan are reported. The test results and this report have been reviewed for correctness, technical adequacy, completeness, and accuracy.

Kruger, Albert A.; Joseph, I.; Muller, I. S.; Gong, W.; Gan, H.; Pegg, I. L.; Matlack, K. S.

2013-12-03T23:59:59.000Z

260

Final Report - LAW Envelope C Glass Formulation Testing to Increase Waste Loading, VSL-05R5900-1  

SciTech Connect (OSTI)

This report describes the results of testing specified by Test Plan VSL-05R5900-1 Rev.0. The work was performed in compliance with the quality assurance requirements specified in the Test Plan. Results required by the Test Plan are reported. The test results and this report have been reviewed for correctness, technical adequacy, completeness, and accuracy.

Kruger, Albert A.; Pegg, I. L.; Matlack, K. S.; Joseph, I.; Muller, I. S.; Gong, W.

2013-12-03T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Directed random testing  

E-Print Network [OSTI]

Random testing can quickly generate many tests, is easy to implement, scales to large software applications, and reveals software errors. But it tends to generate many tests that are illegal or that exercise the same parts ...

Pacheco, Carlos, Ph.D. Massachusetts Institute of Technology

2009-01-01T23:59:59.000Z

262

Test Herrera Report Template  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

development are described in detail in the following section. The model was run in six test sites: Test Site 1 is along the Cowlitz River (Segment 3); Test Site 2 includes the...

263

ZiaTest  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ZiaTest ZiaTest Description This test executes a new proposed standard benchmark method for MPI startup that is intended to provide a realistic assessment of both launch and...

264

Test profiles for stationary energy storage applications  

SciTech Connect (OSTI)

Evaluation of battery and other energy storage technologies for stationary uses is progressing rapidly toward application-specific testing that uses computer-based data acquisition and control equipment, active electronic loads and power supplies, and customized software, to enable sophisticated test regimes that simulate actual use conditions. These simulated-use tests provide more accurate performance and life evaluations than simple constant resistance or current testing regimes. Some of the tests use stepped constant-power charge and discharge regimes to simulate conditions created by electric utility applications such as frequency regulation and spinning reserve. Other test profiles under development simulate conditions for the energy storage component of Remote Area Power Supplies (RAPS) that include renewable and/or fossil-fueled generators. Various RAPS applications have unique sets of service conditions that require specialized test profiles. However, almost all RAPS tests and many tests that represent other stationary applications need to simulate significant time periods during which storage devices operate at low-to-medium states-of-charge without full recharge. Consideration of these and similar issues in simulated-use test regimes is necessary to effectively predict the responses of the various types of batteries in specific stationary applications. This paper describes existing and evolving stationary applications for energy storage technologies and test regimes that are designed to simulate them. The paper also discusses efforts to develop international testing standards.

Butler, P.C. [Sandia National Labs., Albuquerque, NM (United States); Cole, J.F. [International Lead Zinc Research Organization, Research Triangle Park, NC (United States); Taylor, P.A. [Energetics, Inc., Columbia, MD (United States)

1998-09-01T23:59:59.000Z

265

Long-term corrosion testing plan.  

SciTech Connect (OSTI)

This document describes the testing and facility requirements to support the Yucca Mountain Project long-term corrosion testing program. The purpose of this document is to describe a corrosion testing program that will (a) reduce model uncertainty and variability, (b) reduce the reliance upon overly conservative assumptions, and (c) improve model defensibility. Test matrices were developed for 17 topical areas (tasks): each matrix corresponds to a specific test activity that is a subset of the total work performed in a task. A future document will identify which of these activities are considered to be performance confirmation activities. Detailed matrices are provided for FY08, FY09 and FY10 and rough order estimates are provided for FY11-17. Criteria for the selection of appropriate test facilities were developed through a meeting of Lead Lab and DOE personnel on October 16-17, 2007. These criteria were applied to the testing activities and recommendations were made for the facility types appropriate to carry out each activity. The facility requirements for each activity were assessed and activities were identified that can not be performed with currently available facilities. Based on this assessment, a total of approximately 10,000 square feet of facility space is recommended to accommodate all future testing, given that all testing is consolidated to a single location. This report is a revision to SAND2008-4922 to address DOE comments.

Wall, Frederick Douglas; Brown, Neil R. (Los Alamos National Laboratory, Los Alamos, NM)

2009-02-01T23:59:59.000Z

266

Vendor System Vulnerability Testing Test Plan  

SciTech Connect (OSTI)

The Idaho National Laboratory (INL) prepared this generic test plan to provide clients (vendors, end users, program sponsors, etc.) with a sense of the scope and depth of vulnerability testing performed at the INLs Supervisory Control and Data Acquisition (SCADA) Test Bed and to serve as an example of such a plan. Although this test plan specifically addresses vulnerability testing of systems applied to the energy sector (electric/power transmission and distribution and oil and gas systems), it is generic enough to be applied to control systems used in other critical infrastructures such as the transportation sector, water/waste water sector, or hazardous chemical production facilities. The SCADA Test Bed is established at the INL as a testing environment to evaluate the security vulnerabilities of SCADA systems, energy management systems (EMS), and distributed control systems. It now supports multiple programs sponsored by the U.S. Department of Energy, the U.S. Department of Homeland Security, other government agencies, and private sector clients. This particular test plan applies to testing conducted on a SCADA/EMS provided by a vendor. Before performing detailed vulnerability testing of a SCADA/EMS, an as delivered baseline examination of the system is conducted, to establish a starting point for all-subsequent testing. The series of baseline tests document factory delivered defaults, system configuration, and potential configuration changes to aid in the development of a security plan for in depth vulnerability testing. The baseline test document is provided to the System Provider,a who evaluates the baseline report and provides recommendations to the system configuration to enhance the security profile of the baseline system. Vulnerability testing is then conducted at the SCADA Test Bed, which provides an in-depth security analysis of the Vendors system.b a. The term System Provider replaces the name of the company/organization providing the system being evaluated. This can be the system manufacturer, a system user, or a third party organization such as a government agency. b. The term Vendor (or Vendors) System replaces the name of the specific SCADA/EMS being tested.

James R. Davidson

2005-01-01T23:59:59.000Z

267

DOE-STD-1104 Requirements Crosswalk  

Office of Environmental Management (EM)

09 to DOE-STD-1104-2014 Requirements Matrix - 1 - No. Section Page Number DOE-STD-1104-2009 Requirement DOE-STD-1104-2014 Requirements Comment Gen DOE-STD-1104-2009 was broadly...

268

Physics Degree Requirements 2008 -2010 Bulletin  

E-Print Network [OSTI]

Physics Degree Requirements 2008 -2010 Bulletin Professional Option Student: __________________________ Advisor: ____________________________ Updated 2/8/08 Physics Required Cr Gr Taken PHYS 137 1 ___ ______ PHYS 461 4 ___ ______ PHYS 490 3 ___ ______ Subtotal 47 (C- or better required) Physics Electives (8 cr

Dyer, Bill

269

A Requirements Analyst's Apprentice: A Proposal  

E-Print Network [OSTI]

The Requirements Analyst's APprentice (RAAP) partially automates the modeling process involved in creating a software requirement. It uses knowledge of the specific domain and general experience regarding software requirements ...

Reubenstein, Howard

270

Dipole aperture and superconductor requirements  

SciTech Connect (OSTI)

The cost of an accelerator is not proportional to the aperture. A change in aperture by a certain percentage results in an overall accelerator cost change by only a fraction of that percentage; the fraction may be between 0.1 and 0.5 and is almost independent of the bending field. This estimate is obtained by analyzing the superconductor requirements as a function of aperture and by making rough estimates of the largest cost items of the accelerator such as magnets and ring tunnel.

Wipf, S.L.

1983-12-11T23:59:59.000Z

271

New Solutions Require New Thinking  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAXBalanced Scorecard Federal2Energy SecondWellsWinsRules HelpSolutions Require

272

A Test Calculus Framework applied to network security policies  

E-Print Network [OSTI]

A Test Calculus Framework applied to network security policies Yli`es Falcone1 , Jean'H`eres, France Abstract. We propose a syntax-driven test generation technique to au- tomaticaly derive abstract test cases from a set of requirements expressed in a linear temporal logic. Assuming that an elementary

Paris-Sud XI, Université de

273

Mined Geologic Disposal System Requirements Document. Revision 1  

SciTech Connect (OSTI)

This Mined Geologic Disposal System Requirements Document (MGDS-RD) describes the functions to be performed by, and the requirements for, a Mined Geologic Disposal System (MGDS) for the permanent disposal of spent nuclear fuel (SNF) (including SNF loaded in multi-purpose canisters (MPCs)) and commercial and defense high-level radioactive waste (HLW) in support of the Civilian Radioactive Waste Management System (CRWMS). The purpose of the MGDS-RD is to define the program-level requirements for the design of the Repository, the Exploratory Studies Facility (ESF), and Surface Based Testing Facilities (SBTF). These requirements include design, operation, and decommissioning requirements to the extent they impact on the physical development of the MGDS. The document also presents an overall description of the MGDS, its functions (derived using the functional analysis documented by the Physical System Requirements (PSR) documents as a starting point), its segments as described in Section 3.1.3, and the requirements allocated to the segments. In addition, the program-level interfaces of the MGDS are identified. As such, the MGDS-RD provides the technical baseline for the design of the MGDS.

Not Available

1994-03-01T23:59:59.000Z

274

NEVADA TEST SITE WASTE ACCEPTANCE CRITERIA  

SciTech Connect (OSTI)

This document establishes the U. S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive and mixed waste for disposal. Mixed waste generated within the State of Nevada by NNSA/NSO activities is accepted for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the Nevada Test Site Area 3 and Area 5 Radioactive Waste Management Site for storage or disposal.

U.S. DEPARTMENT OF ENERGY, NATIONAL NUCLEAR SECURITY ADMINISTRATION, NEVADA SITE OFFICE

2005-07-01T23:59:59.000Z

275

Corrosion and testing of engine coolants  

SciTech Connect (OSTI)

Corrosion protection is essential to any engine coolant. The wide range of metals and materials utilized in automobile engine cooling systems requires a complex of additives for corrosion resistance. A basic understanding of corrosion mechanisms and influences of individual metals is fundamental to successful formulation. Several types of corrosion can occur and these are addressed by different ASTM engine coolant testing methods. The desire for longer-life coolants emphasizes the need for newer testing methods to successfully simulate engine coolant requirements. Extension of current methods and new approaches to providing protection is discussed.

Beal, R.E. [Amalgamated Technologies, Inc., Scottsdale, AZ (United States)

1999-08-01T23:59:59.000Z

276

Hazardous Waste Minimum Distance Requirements (Connecticut)  

Broader source: Energy.gov [DOE]

These regulations set minimum distance requirements between certain types of facilities that generate, process, store, and dispose of hazardous waste and other land uses. The regulations require an...

277

Bioinformatics and Genomics Degree Requirements Booklet  

E-Print Network [OSTI]

Bioinformatics and Genomics Degree Requirements Booklet Fall 2010 #12;Contents Course Requirements Bioinformatics and Genomics Curriculum -------------------------------------------------------8 General #12;Bioinformatics and Genomics Option (BG

dePamphilis, Claude

278

NBP RFI: Communications Requirements- Honeywell Responses To...  

Broader source: Energy.gov (indexed) [DOE]

the National Broadband Plan by Studying the Communications Requirements of Electric Utilities To Inform Federal Smart NBP RFI: Communications Requirements- Honeywell Responses To...

279

Cold vacuum drying facility design requirements  

SciTech Connect (OSTI)

This document provides the detailed design requirements for the Spent Nuclear Fuel Project Cold Vacuum Drying Facility. Process, safety, and quality assurance requirements and interfaces are specified.

IRWIN, J.J.

1999-07-01T23:59:59.000Z

280

Studying the Communications Requirements of Electric Utilities...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policies- Public Meeting Studying the Communications Requirements of Electric Utilities...

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Structural Testing: An Introduction Flow Graphs Path Testing Conclusions Path Testing  

E-Print Network [OSTI]

Structural Testing: An Introduction Flow Graphs Path Testing Conclusions Path Testing Mohammad Mousavi Eindhoven University of Technology, The Netherlands Software Testing, 2013 Mousavi: Path Testing #12;Structural Testing: An Introduction Flow Graphs Path Testing Conclusions Outline Structural

Mousavi, Mohammad

282

Structural Testing: An Introduction Flow Graphs Path Testing Conclusions Path Testing  

E-Print Network [OSTI]

Structural Testing: An Introduction Flow Graphs Path Testing Conclusions Path Testing Mohammad Mousavi Eindhoven University of Technology, The Netherlands Software Testing, 2012 Mousavi: Path Testing #12;Structural Testing: An Introduction Flow Graphs Path Testing Conclusions Outline Structural

Mousavi, Mohammad

283

Initial field testing definition of subsurface sealing and backfilling tests in unsaturated tuff; Yucca Mountain Site Characterization Project  

SciTech Connect (OSTI)

This report contains an initial definition of the field tests proposed for the Yucca Mountain Project repository sealing program. The tests are intended to resolve various performance and emplacement concerns. Examples of concerns to be addressed include achieving selected hydrologic and structural requirements for seals, removing portions of the shaft liner, excavating keyways, emplacing cementitious and earthen seals, reducing the impact of fines on the hydraulic conductivity of fractures, efficient grouting of fracture zones, sealing of exploratory boreholes, and controlling the flow of water by using engineered designs. Ten discrete tests are proposed to address these and other concerns. These tests are divided into two groups: Seal component tests and performance confirmation tests. The seal component tests are thorough small-scale in situ tests, the intermediate-scale borehole seal tests, the fracture grouting tests, the surface backfill tests, and the grouted rock mass tests. The seal system tests are the seepage control tests, the backfill tests, the bulkhead test in the Calico Hills unit, the large-scale shaft seal and shaft fill tests, and the remote borehole sealing tests. The tests are proposed to be performed in six discrete areas, including welded and non-welded environments, primarily located outside the potential repository area. The final selection of sealing tests will depend on the nature of the geologic and hydrologic conditions encountered during the development of the Exploratory Studies Facility and detailed numerical analyses. Tests are likely to be performed both before and after License Application.

Fernandez, J.A. [Sandia National Labs., Albuquerque, NM (United States); Case, J.B.; Tyburski, J.R. [I. T. Corp., Albuquerque, NM (United States)

1993-05-01T23:59:59.000Z

284

Closed chamber drill stem test detects deep damage  

SciTech Connect (OSTI)

Closed chamber drill stem tests are a relatively new development in drill stem testing. The technique was originated to reduce operational and safety problems caused by hydrate formation during conventional drill stem tests in the Canadian Arctic. During the 1970s, closed chamber testing found widespread acceptance in Canada and is now becoming more widely used in the US. The closed chamber testing method is used in conjunction with conventional drill stem testing tools and equipment. The only additional requirement is a means of continuously monitoring pressure at the surface; therefore, the method can be conducted anywhere conventional drill stem testing equipment is available. The advantage and disadvantages of the system are discussed.

Berkstresser, M.

1982-02-01T23:59:59.000Z

285

STREAMLINED APPROACH FOR ENVIRONMENTAL RESTORATION PLAN FOR CORRECTIVE ACTION UNIT 116: AREA 25 TEST CELL C FACILITYNEVADA TEST SITE, NEVADA  

SciTech Connect (OSTI)

This Streamlined Approach for Environmental Restoration Plan identifies the activities required for the closure of Corrective Action Unit 116, Area 25 Test Cell C Facility. The Test Cell C Facility is located in Area 25 of the Nevada Test Site approximately 25 miles northwest of Mercury, Nevada.

NONE

2006-07-01T23:59:59.000Z

286

Improving Unit Operations-Test Station Performance  

E-Print Network [OSTI]

IMPROVING UNIT OPERATIONS - TEST STATION PERFORMANCE JosqIb 1. Filak. Jr, ? Corporate Energy Manager. Park.er?Hannafin COfpontioo- Cleveland. Oh ABSTRACT: This program's basic concept deals with the possibilities for reducing energy efficiency... requirements, control operation test performance functions more successfully, and retain peak load surges from reaching higher utility rate expense levels. 142 ESL-IE-95-04-23 Proceedings from the Seventeenth Industrial Energy Technology Conference...

Filak, J. J. Jr.

287

Modular test facility for HTS insert coils  

SciTech Connect (OSTI)

The final beam cooling stages of a Muon Collider may require DC solenoid magnets with magnetic fields in the range of 40-50 T. In this paper we will present a modular test facility developed for the purpose of investigating very high field levels with available 2G HTS superconducting materials. Performance of available conductors is presented, together with magnetic calculations and evaluation of Lorentz forces distribution on the HTS coils. Finally a test of a double pancake coil is presented.

Lombardo, V; Bartalesi, A.; Barzi, E.; Lamm, M.; Turrioni, D.; Zlobin, A.V.; /Fermilab

2009-10-01T23:59:59.000Z

288

National Ignition Facility system design requirements Laser System SDR002  

SciTech Connect (OSTI)

This System Design Requirement document establishes the performance, design, development, and test requirements for the NIP Laser System. The Laser System generates and delivers high-power optical pulses to the target chamber, and is composed of all optical puke creating and transport elements from Puke Generation through Final Optics as well as the special equipment that supports, energizes and controls them. The Laser System consists of the following WBS elements: 1.3 Laser System 1.4 Beam Transport System 1.6 Optical Components 1.7 Laser Control 1.8.7 Final Optics.

Larson, D.W.; Bowers, J.M.; Bliss, E.S.; Karpenko, V.P.; English, E.

1996-08-20T23:59:59.000Z

289

Solderability test system  

DOE Patents [OSTI]

A new test method to quantify capillary flow solderability on a printed wiring board surface finish. The test is based on solder flow from a pad onto narrow strips or lines. A test procedure and video image analysis technique were developed for conducting the test and evaluating the data. Feasibility tests revealed that the wetted distance was sensitive to the ratio of pad radius to line width (l/r), solder volume, and flux predry time. 11 figs.

Yost, F.; Hosking, F.M.; Jellison, J.L.; Short, B.; Giversen, T.; Reed, J.R.

1998-10-27T23:59:59.000Z

290

Solderability test system  

DOE Patents [OSTI]

A new test method to quantify capillary flow solderability on a printed wiring board surface finish. The test is based on solder flow from a pad onto narrow strips or lines. A test procedure and video image analysis technique were developed for conducting the test and evaluating the data. Feasibility tests revealed that the wetted distance was sensitive to the ratio of pad radius to line width (l/r), solder volume, and flux predry time.

Yost, Fred (Cedar Crest, NM); Hosking, Floyd M. (Albuquerque, NM); Jellison, James L. (Albuquerque, NM); Short, Bruce (Beverly, MA); Giversen, Terri (Beverly, MA); Reed, Jimmy R. (Austin, TX)

1998-01-01T23:59:59.000Z

291

CERTS Microgrid Laboratory Test Bed  

SciTech Connect (OSTI)

The objective of the CERTS Microgrid Test Bed project was to enhance the ease of integrating energy sources into a microgrid. The project accomplished this objective by developing and demonstrating three advanced techniques, collectively referred to as the CERTS Microgrid concept, that significantly reduce the level of custom field engineering needed to operate microgrids consisting of generating sources less than 100kW. The techniques comprising the CERTS Microgrid concept are: 1) a method for effecting automatic and seamless transitions between grid-connected and islanded modes of operation, islanding the microgrid's load from a disturbance, thereby maintaining a higher level of service, without impacting the integrity of the utility's electrical power grid; 2) an approach to electrical protection within a limited source microgrid that does not depend on high fault currents; and 3) a method for microgrid control that achieves voltage and frequency stability under islanded conditions without requiring high-speed communications between sources. These techniques were demonstrated at a full-scale test bed built near Columbus, Ohio and operated by American Electric Power. The testing fully confirmed earlier research that had been conducted initially through analytical simulations, then through laboratory emulations,and finally through factory acceptance testing of individual microgrid components. The islanding and resychronization method met all Institute of Electrical and Electronics Engineers Standard 1547 and power quality requirements. The electrical protection system was able to distinguish between normal and faulted operation. The controls were found to be robust under all conditions, including difficult motor starts and high impedance faults. The results from these tests are expected to lead to additional testing of enhancements to the basic techniques at the test bed to improve the business case for microgrid technologies, as well to field demonstrations involving microgrids that involve one or more of the CERTS Microgrid concepts. Future planned microgrid work involves unattended continuous operation of the microgrid for 30 to 60 days to determine how utility faults impact the operation of the microgrid and to gage the power quality and reliability improvements offered by microgrids.

Eto, Joe; Lasseter, Robert; Schenkman, Ben; Stevens, John; Klapp, Dave; Volkommer, Harry; Linton, Ed; Hurtado, Hector; Roy, Jean

2009-06-18T23:59:59.000Z

292

RSG Deployment Case Testing Results  

SciTech Connect (OSTI)

The RSG deployment case design is centered on taking the RSG system and producing a transport case that houses the RSG in a safe and controlled manner for transport. The transport case was driven by two conflicting constraints, first that the case be as light as possible, and second that it meet a stringent list of Military Specified requirements. The design team worked to extract every bit of weight from the design while striving to meet the rigorous Mil-Spec constraints. In the end compromises were made primarily on the specification side to control the overall weight of the transport case. This report outlines the case testing results.

Owsley, Stanley L.; Dodson, Michael G.; Hatchell, Brian K.; Seim, Thomas A.; Alexander, David L.; Hawthorne, Woodrow T.

2005-09-01T23:59:59.000Z

293

Grantee Checklist for the Inspection & Monitoring Requirement  

Broader source: Energy.gov [DOE]

This document walks Grantees through the Inspection & Monitoring requirement of the Quality Work Plan.

294

Logical Structure Extraction from Software Requirements Documents  

E-Print Network [OSTI]

Documents I. INTRODUCTION Requirements management (RM) tools store and manipu- late software requirementsLogical Structure Extraction from Software Requirements Documents Rehan Rauf, Michal Antkiewicz,mantkiew,kczarnec}@gsd.uwaterloo.ca Abstract--Software requirements documents (SRDs) are often authored in general-purpose rich-text editors

Czarnecki, Krzysztof

295

Postirradiation Testing Laboratory (327 Building)  

SciTech Connect (OSTI)

A Standards/Requirements Identification Document (S/RID) is the total list of the Environment, Safety and Health (ES and H) requirements to be implemented by a site, facility, or activity. These requirements are appropriate to the life cycle phase to achieve an adequate level of protection for worker and public health and safety, and the environment during design, construction, operation, decontamination and decommissioning, and environmental restoration. S/RlDs are living documents, to be revised appropriately based on change in the site`s or facility`s mission or configuration, a change in the facility`s life cycle phase, or a change to the applicable standards/requirements. S/RIDs encompass health and safety, environmental, and safety related safeguards and security (S and S) standards/requirements related to the functional areas listed in the US Department of Energy (DOE) Environment, Safety and Health Configuration Guide. The Fluor Daniel Hanford (FDH) Contract S/RID contains standards/requirements, applicable to FDH and FDH subcontractors, necessary for safe operation of Project Hanford Management Contract (PHMC) facilities, that are not the direct responsibility of the facility manager (e.g., a site-wide fire department). Facility S/RIDs contain standards/requirements applicable to a specific facility that are the direct responsibility of the facility manager. S/RlDs are prepared by those responsible for managing the operation of facilities or the conduct of activities that present a potential threat to the health and safety of workers, public, or the environment, including: Hazard Category 1 and 2 nuclear facilities and activities, as defined in DOE 5480.23. Selected Hazard Category 3 nuclear, and Low Hazard non-nuclear facilities and activities, as agreed upon by RL. The Postirradiation Testing Laboratory (PTL) S/RID contains standards/ requirements that are necessary for safe operation of the PTL facility, and other building/areas that are the direct responsibility of the specific facility manager. The specific DOE Orders, regulations, industry codes/standards, guidance documents and good industry practices that serve as the basis for each element/subelement are identified and aligned with each subelement.

Kammenzind, D.E.

1997-05-28T23:59:59.000Z

296

Check for peroxides every 6 months. opened test 1 test 2 test 3  

E-Print Network [OSTI]

Check for peroxides every 6 months. opened test 1 test 2 test 3 date initials Check for peroxides every 6 months. opened test 1 test 2 test 3 date initials Check for peroxides every 6 months. Test strips can be obtained from EH&S, 5-8200 opened test 1 test 2 test 3 date initials Check for peroxides

Pawlowski, Wojtek

297

DWPF Recycle Evaporator Simulant Tests  

SciTech Connect (OSTI)

Testing was performed to determine the feasibility and processing characteristics of an evaporation process to reduce the volume of the recycle stream from the Defense Waste Processing Facility (DWPF). The concentrated recycle would be returned to DWPF while the overhead condensate would be transferred to the Effluent Treatment Plant. Various blends of evaporator feed were tested using simulants developed from characterization of actual recycle streams from DWPF and input from DWPF-Engineering. The simulated feed was evaporated in laboratory scale apparatus to target a 30X volume reduction. Condensate and concentrate samples from each run were analyzed and the process characteristics (foaming, scaling, etc) were visually monitored during each run. The following conclusions were made from the testing: Concentration of the ''typical'' recycle stream in DWPF by 30X was feasible. The addition of DWTT recycle streams to the typical recycle stream raises the solids content of the evaporator feed considerably and lowers the amount of concentration that can be achieved. Foaming was noted during all evaporation tests and must be addressed prior to operation of the full-scale evaporator. Tests were conducted that identified Dow Corning 2210 as an antifoam candidate that warrants further evaluation. The condensate has the potential to exceed the ETP WAC for mercury, silicon, and TOC. Controlling the amount of equipment decontamination recycle in the evaporator blend would help meet the TOC limits. The evaporator condensate will be saturated with mercury and elemental mercury will collect in the evaporator condensate collection vessel. No scaling on heating surfaces was noted during the tests, but splatter onto the walls of the evaporation vessels led to a buildup of solids. These solids were difficult to remove with 2M nitric acid. Precipitation of solids was not noted during the testing. Some of the aluminum present in the recycle streams was converted from gibbsite to aluminum oxide during the evaporation process. The following recommendations were made: Recycle from the DWTT should be metered in slowly to the ''typical'' recycle streams to avoid spikes in solids content to allow consistent processing and avoid process upsets. Additional studies should be conducted to determine acceptable volume ratios for the HEME dissolution and decontamination solutions in the evaporator feed. Dow Corning 2210 antifoam should be evaluated for use to control foaming. Additional tests are required to determine the concentration of antifoam required to prevent foaming during startup, the frequency of antifoam additions required to control foaming during steady state processing, and the ability of the antifoam to control foam over a range of potential feed compositions. This evaluation should also include evaluation of the degradation of the antifoam and impact on the silicon and TOC content of the condensate. The caustic HEME dissolution recycle stream should be neutralized to at least pH of 7 prior to blending with the acidic recycle streams. Dow Corning 2210 should be used during the evaporation testing using the radioactive recycle samples received from DWPF. Evaluation of additional antifoam candidates should be conducted as a backup for Dow Corning 2210. A camera and/or foam detection instrument should be included in the evaporator design to allow monitoring of the foaming behavior during operation. The potential for foam formation and high solids content should be considered during the design of the evaporator vessel.

Stone, M

2005-04-05T23:59:59.000Z

298

Automatic Test Factoring for Java  

E-Print Network [OSTI]

Test factoring creates fast, focused unit tests from slow system-widetests; each new unit test exercises only a subset of the functionalityexercised by the system test. Augmenting a test suite with factoredunit tests ...

Saff, David

2005-06-08T23:59:59.000Z

299

Measurement of projectile energy and velocity requirements for the disruption of unexploded ordnance  

E-Print Network [OSTI]

This paper details the design and fabrication of a disrupting test rig for measuring the energy required to separate the fuze from the casing of unexploded ordnance (UXO), also called disrupting the device. Preliminary ...

Jeunnette, Mark N. (Mark Nathaniel), 1979-

2013-01-01T23:59:59.000Z

300

Hanford Tank Farms Waste Certification Flow Loop Test Plan  

SciTech Connect (OSTI)

A future requirement of Hanford Tank Farm operations will involve transfer of wastes from double shell tanks to the Waste Treatment Plant. As the U.S. Department of Energy contractor for Tank Farm Operations, Washington River Protection Solutions anticipates the need to certify that waste transfers comply with contractual requirements. This test plan describes the approach for evaluating several instruments that have potential to detect the onset of flow stratification and critical suspension velocity. The testing will be conducted in an existing pipe loop in Pacific Northwest National Laboratorys facility that is being modified to accommodate the testing of instruments over a range of simulated waste properties and flow conditions. The testing phases, test matrix and types of simulants needed and the range of testing conditions required to evaluate the instruments are described

Bamberger, Judith A.; Meyer, Perry A.; Scott, Paul A.; Adkins, Harold E.; Wells, Beric E.; Blanchard, Jeremy; Denslow, Kayte M.; Greenwood, Margaret S.; Morgen, Gerald P.; Burns, Carolyn A.; Bontha, Jagannadha R.

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Testing and Evaluation Protocol for Spectroscopy-Based Portal Monitors Used for Homeland Security  

E-Print Network [OSTI]

................................................................................................................2 7. Guidance for testing ANSI N42.42 data format requirements ................................2 8. Test modifications from ANSI/IEEE N42.34-2006 requirements...........................3 9 requirements established in ANSI N42.38, "American National Standard for Evaluation and Performance

302

Testing and Evaluation Protocol for Handheld Radionuclide Identifiers for Use in Homeland Security  

E-Print Network [OSTI]

................................................................................................................2 7. Guidance for testing ANSI N42.42 data format requirements ................................2 8. Test modifications from ANSI/IEEE N42.34-2006 requirements...........................3 9 requirements established in ANSI N42.34, "American National Standard Performance Criteria for Hand

303

Testing and Evaluation Protocol for Mobile and Transportable Radiation Monitors Used for Homeland  

E-Print Network [OSTI]

................................................................................................................2 7. Guidance for testing ANSI N42.42 data format requirements ................................2 8. Test modifications from ANSI/IEEE N42.43-2006 requirements...........................3 9 on the performance requirements established in ANSI N42.43, "American National Standard for Evaluation

304

Quality Assurance Program Application for the Component Test Capability  

SciTech Connect (OSTI)

This paper documents the application of quality requirements to Component Test Capability (CTC) Project activities for each CTC alternative. Four alternatives are considered for quality program application: do nothing, vendor testing, existing testing facility modification, and Component Test Facility. It also describes the advantages and disadvantages of using the existing Next Generation Nuclear Plant Quality Program Plan with CTC modifications versus a stand-alone CTC Quality Program Plan.

Stephanin L. Austad

2009-06-01T23:59:59.000Z

305

Animal Health Diagnostic Center Test and Fee Schedule Test Name Test Fee Discipline Test Days Lag** Samples Container Coolant Comments  

E-Print Network [OSTI]

Animal Health Diagnostic Center Test and Fee Schedule Test Name Test Fee Discipline Test Days Lag** Samples Container Coolant Comments Feline Tests Feline Tests Acid Fast Stain (for bacteria) M-F 1-2 days 1 Tests, Equine Cushings Tests , Feline Adrenal Function Tests, or Appendix C. Endocrinology22.00 ACTH

Keinan, Alon

306

Sandia National Laboratories: Mechanical Testing  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

EnergyNuclear Energy Systems Laboratory (NESL) Brayton LabMechanical Testing Mechanical Testing Mechanical Testing Overview Mechanical 1-2 (2008). Standard Test Methods for...

307

OM Code Requirements For MOVs -- OMN-1 and Appendix III  

SciTech Connect (OSTI)

The purpose or scope of the ASME OM Code is to establish the requirements for pre-service and in-service testing of nuclear power plant components to assess their operational readiness. For MOVs this includes those that perform a specific function in shutting down a reactor to the safe shutdown condition, maintaining the safe shutdown condition, and mitigating the consequences of an accident. This paper will present a brief history of industry and regulatory activities related to MOVs and the development of Code requirements to address weaknesses in earlier versions of the OM Code. The paper will discuss the MOV requirements contained in the 2009 version of ASME OM Code, specifically Mandatory Appendix III and OMN-1, Revision 1.

Kevin G. DeWall

2011-08-01T23:59:59.000Z

308

I/O Test  

E-Print Network [OSTI]

IO TEST is intended as a hardware testing and debugging aid for use with the PDP-6 and its associated input multiplexer (analog to digital converter) and output multiplexer (digital to analog converter). While all characters ...

Beeler, Michael

1967-10-01T23:59:59.000Z

309

Articles about Testing  

Broader source: Energy.gov [DOE]

Stories about testing facilities, capabilities, and certification featured by the U.S. Department of Energy (DOE) Wind Program.

310

Field Testing: Independent, Accredited Testing and Validation for the Wind Industry (Fact Sheet)  

SciTech Connect (OSTI)

This fact sheet describes the field testing capabilities at the National Wind Technology Center (NWTC). NREL's specialized facilities and personnel at the NWTC provide the U.S. wind industry with scientific and engineering support that has proven critical to the development of wind energy for U.S. energy needs. The NWTC's specialized field-testing capabilities have evolved over 30 years of continuous support by the U.S. Department of Energy Wind and Hydropower Technologies Program and long standing industry partnerships. The NWTC provides wind industry manufacturers, developers, and operators with turbine and component testing all in one convenient location. Although industry utilizes sophisticated modeling tools to design and optimize turbine configurations, there are always limitations in modeling capabilities, and testing is a necessity to ensure performance and reliability. Designs require validation and testing is the only way to determine if there are flaws. Prototype testing is especially important in capturing manufacturing flaws that might require fleet-wide retrofits. The NWTC works with its industry partners to verify the performance and reliability of wind turbines that range in size from 400 Watts to 3 megawatts. Engineers conduct tests on components and full-scale turbines in laboratory environments and in the field. Test data produced from these tests can be used to validate turbine design codes and simulations that further advance turbine designs.

Not Available

2011-11-01T23:59:59.000Z

311

100 Area soil washing treatability test plan  

SciTech Connect (OSTI)

This test plan describes specifications, responsibilities, and general methodology for conducting a soil washing treatability study as applied to source unit contamination in the 100 Area. The objective ofthis treatability study is to evaluate the use of physical separation systems and chemical extraction methods as a means of separating chemically and radioactively contaminated soil fractions from uncontaminated soil fractions. The purpose of separating these fractions is to minimize the volume of soil requiring permanent disposal. It is anticipated that this treatability study will be performed in two phases of testing, a remedy screening phase and a remedy selection phase. The remedy screening phase consists of laboratory- and bench-scale studies performed by Battelle Pacific Northwest laboratories (PNL) under a work order issued by Westinghouse Hanford Company (Westinghouse Hanford). This phase will be used to provide qualitative evaluation of the potential effectiveness of the soil washing technology. The remedy selection phase, consists of pilot-scale testing performed under a separate service contract to be competitively bid under Westinghouse Hanford direction. The remedy selection phase will provide data to support evaluation of the soil washing technology in future feasibility studies for Interim Remedial Measures (IRMs) or final operable unit (OU) remedies. Performance data from these tests will indicate whether applicable or relevant and appropriate requirements (ARARs) or cleanup goals can be met at the site(s) by application of soil washing. The remedy selection tests wig also allow estimation of costs associated with implementation to the accuracy required for the Feasibility Study.

Not Available

1993-03-01T23:59:59.000Z

312

Soil Testing and Research  

E-Print Network [OSTI]

Soil Testing and Research Analytical Laboratory Copyright 2014 University of Minnesota Soil Testing and Research Analytical Laboratory Department of Soil, Water and Climate College of Food payable to the University of Minnesota We also accept the following credit cards: Soil Testing

Ciocan-Fontanine, Ionut

313

SMVCIR Dimensionality Test  

E-Print Network [OSTI]

the dimensionality test and testing it. The dimensionality test is based on the singular values of the kernel of the spanning set of the vector space. The asymptotic distribution of the spanning set is found by using the central limit theorem, delta method...

Lindsey, Charles D.

2011-08-08T23:59:59.000Z

314

SHINE Vacuum Pump Test Verification  

SciTech Connect (OSTI)

Normetex pumps used world-wide for tritium service are no longer available. DOE and other researchers worldwide have spent significant funds characterizing this pump. Identification of alternate pumps is required for performance and compatibility with tritium gas. Many of the pumps that could be used to meet the functional performance requirements (e.g. pressure and flow conditions) of the Normetex pump have features that include the use of polymers or oils and greases that are not directly compatible with tritium service. This study assembles a test system to determine the flow characteristics for candidate alternate pumps. These tests are critical to the movement of tritium through the SHINE Tritium Purification System (TPS). The purpose of the pump testing is two-fold: (1) obtain baseline vacuum pump characteristics for an alternate (i.e. ''Normetex replacement'') pump intended for use in tritium service; and (2) verify that low pressure hydrogen gas can be transported over distances up to 300 feet by the candidate pumps. Flow rates and nominal system pressures have been identified for the SHINE Mo-99 production process Tritium Purification System (TPS). To minimize the line sizes for the transfer of low pressure tritium from the Neutron Driver Accelerator System (NDAS) to the primary processing systems in the TPS, a ''booster'' pump has been located near the accelerator in the design. A series of pump tests were performed at various configurations using hydrogen gas (no tritium) to ensure that this concept is practical and maintains adequate flow rates and required pressures. This report summarizes the results of the tests that have been performed using various pump configurations. The current design of the Tritium Purification System requires the ''booster'' pump to discharge to or to be backed by another vacuum pump. Since Normetex pumps are no longer manufactured, a commercially available Edwards scroll pump will be used to back the booster pump. In this case the ''booster pump'' is an Adixen Molecular Drag Pump (MDP 5011) and the backing pump is an Edwards (nXDS15iC) scroll pump. Various configurations of the two pumps and associated lengths of 3/4 inch tubing (0 feet to 300 feet) were used in combination with hydrogen and nitrogen flow rates ranging from 25-400 standard cubic centimeters per minute (sccm) to determine whether the proposed pump configuration meets the design criteria for SHINE. The results of this study indicate that even under the most severe conditions (300 feet of tubing and 400 sccm flow rate) the Adixen 5011 MDP can serve as a booster pump to transport gases from the accelerator (NDAS) to the TPS. The Target Gas Receiving System pump (Edwards nXDS15iC) located approximately 300 feet from the accelerator can effectively back the Adixen MDP. The molecular drag pump was able to maintain its full rotational speed even when the flow rate was 400 sccm hydrogen or nitrogen and 300 feet of tubing was installed between the drag pump and the Edwards scroll pump. In addition to maintaining adequate rotation, the pressure in the system was maintained below the target pressure of 30 torr for all flow rates, lengths of tubing, and process gases. This configuration is therefore adequate to meet the SHINE design requirements in terms of flow and pressure.

Morgan, Gregg A; Peters, Brent

2013-09-30T23:59:59.000Z

315

Development of phytotoxicity tests using wetland species  

SciTech Connect (OSTI)

Laboratory phytotoxicity tests used to assess contaminant effects may not effectively protect wetland communities. The authors are developing routine culture and testing methods for selected fresh water plants, that can be used in risk assessments and monitoring of existing wetland systems. Utility of these tests includes evaluating the effects of point or non-point source contamination that may cause water or sediment quality degradation. Selected species include algae (blue-green, green), phytoflagellates (Chlamydomonas, Euglena), and floating or submerged vascular plants (milfoil, coontail, wild celery, elodea, duckweed). Algae toxicity tests range from 2-d, 4-d, and 7 day tests, and macrophyte tests from 10-d to 14 days. Metribuzin and boron are the selected contaminants for developing the test methods. Metribuzin, a triazinone herbicide, is a photosystem 11 inhibitor, and is commonly used for control of grass and broad-leaf plants. As a plant micronutrient, boron is required in very small amounts, but excessive levels can result in phytotoxicity or accumulation. The investigations focus on the influence of important factors including the influence of light quality and quantity, and nutrient media. Reference toxicant exposures with potassium chloride are used to establish baseline data for sensitivity and vitality of the plants. These culture and test methods will be incorporated into recommendations for standard phytotoxicity test designs.

Nelson, M.K.; Fairchild, J.F. [National Biological Survey, Columbia, MO (United States)

1994-12-31T23:59:59.000Z

316

Characterizing Test Methods and Emissions Reduction Performance of In-Use  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTieCelebrate Earth Day withCharacterizationDiesel Retrofit Technologies

317

Online PM Measurement for In-Use Testing | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F SSales LLCDiesel Engines | DepartmentLaboratory |PM Measurement

318

Test specification for decant pump and winch assembly  

SciTech Connect (OSTI)

This specification provides the requirements for testing of the vertical turbine decant pump including the floating suction arm with load sensing winch control, instrumentation and the associated PLC/PC control system.

Staehr, T.W.

1994-12-07T23:59:59.000Z

319

Physics Degree Requirements 2008-2010 Bulletin  

E-Print Network [OSTI]

Physics Degree Requirements 2008-2010 Bulletin Interdisciplinary Option Student: ___________________ Advisor: ________________ Option: ________________ Updated 2/8/08 Physics Required Cr Gr Taken PHYS 137 1) Physics Electives (3 cr; 253 and 300) PHYS _____ ___ ___ ______ PHYS _____ ___ ___ ______ PHYS

Dyer, Bill

320

Secondary Mathematics Teacher Certification Requirements Mathematics  

E-Print Network [OSTI]

Secondary Mathematics Teacher Certification Requirements Mathematics Undergraduate Program:______________ Date:______________ Date:______________ Date:______________ MATHEMATICS CORE REQUIREMENTS MATH 151 Introduction to Mathematical Analysis I CMSC 201 Computer Science I MATHEMATICS EDUCATION CONCENTRATION

Maryland, Baltimore County, University of

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

City of Dubuque- Solar Thermal Licensing Requirement  

Broader source: Energy.gov [DOE]

The City of Dubuque requires a Solar Thermal License in order for a person to install a solar thermal project on a home or business. The requirement does not apply to solar photovoltaics. The...

322

Salt Lake City- High Performance Buildings Requirement  

Broader source: Energy.gov [DOE]

Salt Lake City's mayor issued an executive order in July 2005 requiring that all public buildings owned and controlled by the city be built or renovated to meet the requirements of LEED "silver"...

323

BENCAP, LLC: CAPSULE VELOCITY TEST  

SciTech Connect (OSTI)

Ben Cap, LLC, has a technology that utilizes bebtonite to plug wells. The bentonite is encapsulated in a cardboard capsule, droped down to the bottom of the well where it is allowed to hydrate, causing the bentonite to expand and plug the well. This method of plugging a well is accepted in some, but not all states. This technology can save a significant amount of money when compared to cementing methods currently used to plug and abandon wells. The test objective was to obtain the terminal velocity of the capsule delivery system as it drops through a column of water in a wellbore. Once the terminal velocity is known, the bentonite swelling action can be timed not to begin swelling until it reaches the bottom of the well bore. The results of the test showed that an average speed of 8.93 plus or minus 0.12 ft/sec was achieved by the capsule as it was falling through a column of water. Plotting the data revealed a very linear function with the capsules achieving terminal velocity shortly after being released. The interference of the capsule impacting the casing was not readily apparent in any of the runs, but a siginal sampling anomaly was present in one run. Because the anomaly was so brief and not present in any of the other runs, no solid conclusions could be drawn. Additional testing would be required to determine the effects of capsules impacting a fluid level that is not at surface.

Meidinger, Brian

2005-09-07T23:59:59.000Z

324

Delegation Procedures - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Energy's primary means of establishing policies, requirements, responsibilities, and procedures for Departmental elements and contractors. Directives Program Management Camille...

325

Secondary Science Teacher Certification Requirements Undergraduate Program  

E-Print Network [OSTI]

:____________________________________________ Initial GPA: _________ Campus ID: ____________________ Advisor _________ _________ _____ _____ Mathematics Requirements: STAT 350 Statistics with Applications OR STAT 351 Applied Statistics for Business

Maryland, Baltimore County, University of

326

EXAMINATION REQUIREMENTS FOR CERTIFICATION Early Childhood Education, Birth to Grade 2  

E-Print Network [OSTI]

EXAMINATION REQUIREMENTS FOR CERTIFICATION Early Childhood Education, Birth to Grade 2: 1. Academic Test (ALST) 2. Educating All Students (EAS) 3. CST Literacy Students with Disabilities, Birth to Grade FOR CERTIFICATION Deaf and Hard of Hearing, Pre K-12 1. Liberal Arts and Science Test (LAST) 2. Academic Literacy

Qiu, Weigang

327

Clean Air Act Requirements: Uranium Mill Tailings  

E-Print Network [OSTI]

EPA'S Clean Air Act Requirements: Uranium Mill Tailings Radon Emissions Rulemaking Reid J. Rosnick requirements for operating uranium mill tailings (Subpart W) Status update on Subpart W activities Outreach/Communications #12;3 EPA Regulatory Requirements for Operating Uranium Mill Tailings (Clean Air Act) · 40 CFR 61

328

Materials Science and Engineering Graduate Program Requirements  

E-Print Network [OSTI]

Materials Science and Engineering Graduate Program Requirements The Department of Materials Science-Thesis option requires a Special Project, and the Ph.D. degree requires a Doctoral Dissertation. MASTER (6034), Advanced Materials Techniques: Experiment, Theory, and Characterization (6011), and Engineering

Simons, Jack

329

ORIGINAL ARTICLE Information requirements analysis for holonic  

E-Print Network [OSTI]

ORIGINAL ARTICLE Information requirements analysis for holonic manufacturing systems in a virtual and development of holonic manu- facturing systems requires careful, and sometimes risky, decision making, the authors propose a methodology for a holonic manufacturing systems requirement analysis that is based

330

FCEDS General Education Requirements (Updated 2013)  

E-Print Network [OSTI]

FCEDS General Education Requirements (Updated 2013) This proposal outlines a plan that would allow a transfer student to apply an Associate of Arts or Associate of Science degree to meet the General Education requirements of the Family and Consumer Sciences Education and Studies (FCEDS) curriculum. The required

Mayfield, John

331

Test and evaluation by genetic algorithms  

SciTech Connect (OSTI)

Autonomous vehicles will require sophisticated software controllers. Given a vehicle simulation and an intelligent controller for that vehicle, what methods are available for testing the controller`s robustness? Validation and verification are enough: The controller might perform as specified, but the specifications could be incorrect; that is, the vehicle might not behave as expected. Testing all possible situations is obviously intractable. And techniques for testing isolated, low-level controllers do not apply to the vehicle as a whole. Also, traditional controller tests are labor intensive and time consuming. Some methods require simulated vehicle missions to test the controller`s robustness under various conditions. After designing a fault scenario that will cause particular failures during a simulated mission, the test engineers observe the vehicle`s resulting behavior and then refine the fault scenario to better exercise the controller. This cycle is repeated until the engineers are confident that the vehicle`s behavior will be appropriate in the field. Implicitly, the engineers are searching for interesting fault scenarios.

Schultz, A.C.; Grefenstette, J.J.; Jong, K.A.

1994-12-31T23:59:59.000Z

332

Coherent testing and simulation of composite blade repair  

E-Print Network [OSTI]

COHERENT TESTING AND SIMULATION OF COMPOSITE BLADE REPAIR A Thesis by BRIAN GLENN MCNICHOLS Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE... December 1997 Major Subject: Mechanical Engineering COHERENT TESTING AND SIMULATION OF COMPOSITE BLADE REPAIR A Thesis by BRIAN GLENN MCNICHOLS Submitted to Texas A&M University In partial fulfillment of the requirements for the degree of MASTER...

McNichols, Brian Glenn

2012-06-07T23:59:59.000Z

333

Advanced Technology Vehicle Testing  

SciTech Connect (OSTI)

The light-duty vehicle transportation sector in the United States depends heavily on imported petroleum as a transportation fuel. The Department of Energys Advanced Vehicle Testing Activity (AVTA) is testing advanced technology vehicles to help reduce this dependency, which would contribute to the economic stability and homeland security of the United States. These advanced technology test vehicles include internal combustion engine vehicles operating on 100% hydrogen (H2) and H2CNG (compressed natural gas) blended fuels, hybrid electric vehicles, neighborhood electric vehicles, urban electric vehicles, and electric ground support vehicles. The AVTA tests and evaluates these vehicles with closed track and dynamometer testing methods (baseline performance testing) and accelerated reliability testing methods (accumulating lifecycle vehicle miles and operational knowledge within 1 to 1.5 years), and in normal fleet environments. The Arizona Public Service Alternative Fuel Pilot Plant and H2-fueled vehicles are demonstrating the feasibility of using H2 as a transportation fuel. Hybrid, neighborhood, and urban electric test vehicles are demonstrating successful applications of electric drive vehicles in various fleet missions. The AVTA is also developing electric ground support equipment (GSE) test procedures, and GSE testing will start during the fall of 2003. All of these activities are intended to support U.S. energy independence. The Idaho National Engineering and Environmental Laboratory manages these activities for the AVTA.

James Francfort

2003-11-01T23:59:59.000Z

334

Special Contract Requirements Enclosure 2 INSTRUCTIONS TO CONTRACTING OFFICERS: The Special Contract Requirement "Workers  

E-Print Network [OSTI]

Special Contract Requirements Enclosure 2 INSTRUCTIONS TO CONTRACTING OFFICERS: The Special Contract Requirement "Workers Compensation Insurance (Defense Base Act) (APRIL 2011)" shall be included in the contract as applicable. Whenever Defense Base Act (DBA) insurance is required under the contract

US Army Corps of Engineers

335

Requirements in DOE O 5480.19, Conduct of Operations Requirements...  

Broader source: Energy.gov (indexed) [DOE]

Requirements in DOE O 5480.19, Conduct of Operations Requirements for DOE Facilities Cross-referenced to DOE O 422.1, Conduct of Operations. Requirements in DOE O 5480.19, Conduct...

336

Finite State Machines Testing problems Conformance Testing Machine Identification FSM-Based Testing  

E-Print Network [OSTI]

Finite State Machines Testing problems Conformance Testing Machine Identification FSM-Based Testing Mousavi: FSM-Based Testing Part II #12;Finite State Machines Testing problems Conformance Testing Machine Identification Outline Finite State Machines Testing problems Conformance Testing Machine Identification Mousavi

Mousavi, Mohammad

337

Advanced Technology Vehicle Testing  

SciTech Connect (OSTI)

The goal of the U.S. Department of Energy's Advanced Vehicle Testing Activity (AVTA) is to increase the body of knowledge as well as the awareness and acceptance of electric drive and other advanced technology vehicles (ATV). The AVTA accomplishes this goal by testing ATVs on test tracks and dynamometers (Baseline Performance testing), as well as in real-world applications (Fleet and Accelerated Reliability testing and public demonstrations). This enables the AVTA to provide Federal and private fleet managers, as well as other potential ATV users, with accurate and unbiased information on vehicle performance and infrastructure needs so they can make informed decisions about acquiring and operating ATVs. The ATVs currently in testing include vehicles that burn gaseous hydrogen (H2) fuel and hydrogen/CNG (H/CNG) blended fuels in internal combustion engines (ICE), and hybrid electric (HEV), urban electric, and neighborhood electric vehicles. The AVTA is part of DOE's FreedomCAR and Vehicle Technologies Program.

James Francfort

2004-06-01T23:59:59.000Z

338

Solutions to Test 1  

E-Print Network [OSTI]

Math 373. Spring 2013. Test 1. February 12, 2013. 1. Tracy is receiving an annuity immediate with quarterly payments of 250 for 10 years. Tracy invests each...

Owner

2014-03-06T23:59:59.000Z

339

Optimum Statistical Test Procedure  

E-Print Network [OSTI]

In this paper we obtain a test which minimizes the sum of the two error probabilities irrespective of whether $\\sigma^2$ is known or unknown.

Rajesh Singh; Jayant Singh; Florentin Smarandache

2009-04-10T23:59:59.000Z

340

MITG Test Plan  

SciTech Connect (OSTI)

The plan presented is for the testing of a prototypical slice of the Modular Isotopic Thermoelectric Generator (MITG). Cross Reference T48-1.

Eck, Marshall B.

1981-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Solutions to Test 1  

E-Print Network [OSTI]

STAT 479. Spring 2014. Test 1. February 18, 2014. 1. You are given the following empirical distribution of losses: 300 500 700 800 1000 1400. An insurance...

jeffb_000

2014-03-04T23:59:59.000Z

342

NON RESIDENT ALIEN REQUIRED DOCUMENTS CLASSIFICATION REQUIRED ATTACHEMENTS MUST BE SUBMITTED WITH THE  

E-Print Network [OSTI]

NON RESIDENT ALIEN REQUIRED DOCUMENTS CLASSIFICATION REQUIRED ATTACHEMENTS MUST BE SUBMITTED WITH THE PAYROLL DOCUMENTS AND CITIZENSHIP STATUS FORM Permanent Resident Resident Alien Card, or I-551 Stamped

Adali, Tulay

343

E-Print Network 3.0 - area tonopah test Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Test Range Manager. CI36 - REQUIREMENTS FOR ACCESS TO GOVERNMENT SITES Permission to enter... Security Division at Livermore; Tonopah ... Source: Fuerschbach, Phillip - Joining...

344

E-Print Network 3.0 - additional test positions Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Collection: Engineering 10 Power-Aware Test Planning in the Early System-on-Chip Design Exploration Process Summary: . The additional required wiring corresponds to 20 units. The...

345

Summary of Test Results for the Interagency Field Test &Evaluation...  

Broader source: Energy.gov (indexed) [DOE]

Summary of Test Results for the Interagency Field Test &Evaluation of Wind Turbine - Radar Interference Mitigation Technologies Summary of Test Results for the Interagency Field...

346

Nevada Test Site Environmental Report 2004  

SciTech Connect (OSTI)

The ''Nevada Test Site Environmental Report 2004'' was prepared by Bechtel Nevada (BN) to meet the information needs of the public and the requirements and guidelines of the U.S. Department of Energy (DOE) for annual site environmental reports. This Executive Summary presents the purpose of the document, the major programs conducted at the Nevada Test Site (NTS), NTS key environmental initiatives, radiological releases and potential doses to the public resulting from site operations, a summary of non-radiological releases, implementation status of the NTS Environmental Management System, and significant environmental accomplishments. Much of the content of this Executive Summary is also presented in a separate stand-alone pamphlet titled ''Nevada Test Site Environmental Report Summary 2004''. It was produced this year to provide a more cost-effective and wider distribution of a hardcopy summary of the ''Nevada Test Site Environmental Report 2004'' to interested DOE stakeholders.

BECHTEL NEVADA

2005-10-01T23:59:59.000Z

347

Standard Test Method for Sandwich Corrosion Test  

E-Print Network [OSTI]

1.1 This test method defines the procedure for evaluating the corrosivity of aircraft maintenance chemicals, when present between faying surfaces (sandwich) of aluminum alloys commonly used for aircraft structures. This test method is intended to be used in the qualification and approval of compounds employed in aircraft maintenance operations. 1.2 The values stated in SI units are to be regarded as the standard. The values given in parentheses are for information. 1.3 This standard may involve hazardous materials, operations, and equipment. This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. Specific hazard statements appear in Section 9.

American Society for Testing and Materials. Philadelphia

2009-01-01T23:59:59.000Z

348

Animal Health Diagnostic Center Test and Fee Schedule Test Name Test Fee Discipline Test Days Lag** Samples Container Coolant Comments  

E-Print Network [OSTI]

Animal Health Diagnostic Center Test and Fee Schedule Test Name Test Fee Discipline Test Days Lag** Samples Container Coolant Comments Equine Tests Equine Tests Acid Fast Stain (for bacteria) M-F 1-2 days 1 4 hours for equine. For more information, see Equine Cushing's Tests or AppendixC. For Equine only

Keinan, Alon

349

Animal Health Diagnostic Center Test and Fee Schedule Test Name Test Fee Discipline Test Days Lag** Samples Container Coolant Comments  

E-Print Network [OSTI]

Animal Health Diagnostic Center Test and Fee Schedule Test Name Test Fee Discipline Test Days Lag** Samples Container Coolant Comments Canine Tests Canine Tests Acid Fast Stain (for bacteria) M-F 1-2 days 1 in insulated container with ice pack. For more information, see Canine Adrenal & Pituitary Function Tests

Keinan, Alon

350

Challenges of Achieving 2012 IECC Air Sealing Requirements in Multifamily Dwellings  

SciTech Connect (OSTI)

?While previous versions of the International Energy Conservation Code (IECC) have included provisions to improve the air tightness of dwellings, for the first time, the 2012 IECC mandates compliance verification through blower door testing. Simply completing the Air Barrier and Insulation Installation checklist through visual inspection is no longer sufficient by itself. In addition, the 2012 IECC mandates a significantly stricter air sealing requirement. In Climate Zones 3 through 8, air leakage may not exceed 3 ACH50, which is a significant reduction from the 2009 IECC requirement of 7 ACH50. This requirement is for all residential buildings, which includes low-rise multifamily dwellings. While this air leakage rate requirement is an important component to achieving an efficient building thermal envelope, currently, the code language doesn't explicitly address differences between single family and multifamily applications. In addition, the 2012 IECC does not provide an option to sample dwellings for larger multifamily buildings, so compliance would have to be verified on every unit. With compliance with the 2012 IECC air leakage requirements on the horizon, several of CARB's multifamily builder partners are evaluating how best to comply with this requirement. Builders are not sure whether it is more practical or beneficial to simply pay for guarded testing or to revise their air sealing strategies to improve compartmentalization to comply with code requirements based on unguarded blower door testing. This report summarizes CARB's research that was conducted to assess the feasibility of meeting the 2012 IECC air leakage requirements in 3 multifamily buildings.

Klocke, S.; Faakye, O.; Puttagunta, S.

2014-10-01T23:59:59.000Z

351

PUNCTURE TEST CHARACTERIZATION OF GLOVEBOX GLOVES  

SciTech Connect (OSTI)

An experiment was conducted to determine the puncture resistance of 15 gloves that are used or proposed for use in the Tritium Facility at Savannah River Site (SRS). These data will serve as a baseline for characterization and may be incorporated into the glove procurement specification. The testing was conducted in agreement with ASTM D120 and all of the gloves met or exceeded the minimum requirements. Butyl gloves exhibited puncture resistance nearly 2.5 times the minimum requirements at SRS while Polyurethane was nearly 7.5x the minimum.

Korinko, P.; Chapman, G.

2012-02-29T23:59:59.000Z

352

Nevada Test Site Waste Acceptance Criteria  

SciTech Connect (OSTI)

This document establishes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive (LLW) and mixed waste (MW) for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NTS Area 3 and Area 5 Radioactive Waste Management Complex (RWMC) for storage or disposal.

U. S. Department of Energy, National Nuclear Security Administration Nevada Site Office

2005-10-01T23:59:59.000Z

353

Nevada Test Site Environmental Report 2005  

SciTech Connect (OSTI)

The Nevada Test Site Environmental Report 2005 (NTSER) was prepared to meet the information needs of the public and the requirements and guidelines of the U.S. Department of Energy (DOE) for annual site environmental reports. Its purpose is to (1) report compliance status with environmental standards and requirements, (2) present results of environmental monitoring of radiological and nonradiological effluents, (3) report estimated radiological doses to the public from releases of radioactive material, (4) summarize environmental incidents of noncompliance and actions taken in response to them, (5) describe the NTS Environmental Management System and characterize its performance, and (6) highlight significant environmental programs and efforts.

Cathy A. Wills

2006-10-01T23:59:59.000Z

354

Duration Test Report for the Entegrity EW50 Wind Turbine  

SciTech Connect (OSTI)

This report summarizes the results of a duration test that NREL conducted on the Entegrity EW50 wind turbine. This test was conducted in accordance with the International Electrotechnical Commissions' (IEC) standard, Wind Turbine Generator System Part 2: Design requirements for small wind turbines, IEC 61400-2 Ed.2.0, 2006-03.

Smith, J.; Huskey, A.; Jager, D.; Hur, J.

2012-12-01T23:59:59.000Z

355

Integration of well test analysis into naturally fractured reservoir simulation  

E-Print Network [OSTI]

of the requirements for the degree of MASTER OF SCIENCE December 2005 Major Subject: Petroleum Engineering INTEGRATION OF WELL TEST ANALYSIS INTO A NATURALLY FRACTURED RESERVOIR SIMULATION A Thesis by LAURA..., W. John Lee Wayne M. Ahr Head of Department, Stephen A. Holditch December 2005 Major Subject: Petroleum Engineering iii ABSTRACT Integration of Well Test Analysis into a Naturally Fractured Reservoir...

Perez Garcia, Laura Elena

2006-04-12T23:59:59.000Z

356

Stress Testing of Transactional Database Systems Jorge Augusto Meira  

E-Print Network [OSTI]

of Montpellier, France patrick.valduriez@inria.fr Abstract. Transactional database management systems (DBMS) have-based applications that tend to generate huge numbers of concurrent business operations are pushing DBMS performance to test DBMS performance under heavy workload conditions. Answering this question requires a testing

Boyer, Edmond

357

Formal Specification and Testing of a Management Architecture  

E-Print Network [OSTI]

. The aim of our work is to test the applicability of FDTs to managed object specification by formallyFormal Specification and Testing of a Management Architecture G. P. A. Fernandes \\Lambda and J systems management to supply and maintain services required by users has led to a demand for management

Derrick, John

358

Standard Hydrogen Test Protocols for the NREL Sensor Testing Laboratory (Brochure)  

SciTech Connect (OSTI)

This brochure summarizes the test protocols used in the NREL Hydrogen Sensor Test Laboratory for the quantitative assessment of critical analytical performance specifications for hydrogen sensors. Researchers at the NREL Hydrogen Safety Sensor Test Laboratory developed a variety of test protocols to quantitatively assess critical analytical performance specifications for hydrogen sensors. Many are similar to, but typically more rigorous than, the test procedures mandated by ISO Standard 26142 (Hydrogen Detector for Stationary Applications). Specific protocols were developed for linear range, short-term stability, and the impact of fluctuations in temperature (T), pressure (P), relative humidity (RH), and chemical environment. Specialized tests (e.g., oxygen requirement) may also be performed. Hydrogen safety sensors selected for evaluation are subjected to a thorough regimen of test protocols, as described. Sensor testing is performed at NREL on custom-built sensor test fixtures. Environmental parameters such as T, P, RH, and gas composition are rigorously controlled and monitored. The NREL evaluations are performed on commercial hydrogen detectors, on emerging sensing technologies, and for end users to validate sensor performance for specific application needs. Test results and data are shared with the manufacturer or client via summary reports, teleconference phone calls, and, when appropriate, site visits to manufacturer facilities. Client representatives may also monitor NREL's operation while their technologies are being tested. Manufacturers may use test data to illustrate the analytical capability of their technologies and, more importantly, to guide future developments. NREL uses the data to assess technology gaps and deployment considerations. Per NREL Sensor Testing Laboratory policy, test results are treated as proprietary and are not shared with other manufacturers or other entities without permission. The data may be used by NREL in open publications (journal articles, presentations, outreach support, and other reports), but will not be attributed to a specific vendor.

Not Available

2011-12-01T23:59:59.000Z

359

Advanced Test Reactor Tour  

SciTech Connect (OSTI)

The Advanced Test Reactor at Idaho National Laboratory is the foremost nuclear materials test reactor in the world. This virtual tour describes the reactor, how experiments are conducted, and how spent nuclear fuel is handled and stored. For more information about INL research, visit http://www.facebook.com/idahonationallaboratory.

Miley, Don

2011-01-01T23:59:59.000Z

360

Advanced Test Reactor Tour  

ScienceCinema (OSTI)

The Advanced Test Reactor at Idaho National Laboratory is the foremost nuclear materials test reactor in the world. This virtual tour describes the reactor, how experiments are conducted, and how spent nuclear fuel is handled and stored. For more information about INL research, visit http://www.facebook.com/idahonationallaboratory.

Miley, Don

2013-05-28T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Requirements for a Standard Test to Rate the Durability of PV Modules at System Voltage (Presentation)  

SciTech Connect (OSTI)

Degradation modes in photovoltaic modules under system bias voltage stress are described and classified.

Hacke, P.; Terwilliger, K.; Glick, S.; Kempe, M.; Kurtz, S.; Bennett, I.; Kloos, M.

2011-02-01T23:59:59.000Z

362

Decisions Regarding Drug Testing for DOE Positions That Require Access Authorization (Security Clearances)  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office of Audit Services Audit Report Department of EnergyEnergyDecember Presidential

363

Decisions Regarding Drug Testing for DOE Positions That Require Access Authorization (Security Clearances)  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power SystemsResources DOE Zero EnergyData Center Optimization Plan3Energy 4, 2007: NETL's

364

Project W-320 Heel Jet Secondary Catch Mechanism lateral load test  

SciTech Connect (OSTI)

This test procedure establishes the requirements for performing a lateral load test of the Heel Jet Secondary Catch Mechanism (SCM). Successful performance of this test will demonstrate that the SCM is capable of performing as designed when subjected to a force applied normal to the longitudinal axis of the mechanism. This test procedure is prepared following the recommended format and content guidelines for test procedures as prescribed in WHC-IP-1026, Engineering Practice Guidelines, Appendix K, Test Plans, Specifications, Procedures and Reports.

Bellomy, J.R.

1994-09-01T23:59:59.000Z

365

Hypersonic flight testing  

SciTech Connect (OSTI)

As part of the design process for a hypersonic vehicle, it is necessary to predict the aerodynamic and aerothermodynamic environment for flight conditions. This involves combining results obtained from ground testing with analytical modeling to predict the aerodynamics and heating for all conditions of interest. The question which always arises is, how well will these models predict what is actually seen in a flight environment This paper will briefly address ground-testing and analytical modeling and discuss where each is appropriate, and the associated problems with each area. It will then describe flight test options as well as instrumentation currently available and show how flight tests can be used to validate or improve models. Finally, several results will be shown to indicate areas where ground testing and modeling alone are inadequate to accurately predict hypersonic aerodynamics and aerothermodynamics.

Williamson, W.E.

1992-01-01T23:59:59.000Z

366

Nanomechanical testing system  

DOE Patents [OSTI]

An automated testing system includes systems and methods to facilitate inline production testing of samples at a micro (multiple microns) or less scale with a mechanical testing instrument. In an example, the system includes a probe changing assembly for coupling and decoupling a probe of the instrument. The probe changing assembly includes a probe change unit configured to grasp one of a plurality of probes in a probe magazine and couple one of the probes with an instrument probe receptacle. An actuator is coupled with the probe change unit, and the actuator is configured to move and align the probe change unit with the probe magazine and the instrument probe receptacle. In another example, the automated testing system includes a multiple degree of freedom stage for aligning a sample testing location with the instrument. The stage includes a sample stage and a stage actuator assembly including translational and rotational actuators.

Vodnick, David James; Dwivedi, Arpit; Keranen, Lucas Paul; Okerlund, Michael David; Schmitz, Roger William; Warren, Oden Lee; Young, Christopher David

2014-07-08T23:59:59.000Z

367

En beskrivning av manuellt test.  

E-Print Network [OSTI]

?? Test is an area in system development. Test can be performed manually or automated. Test activities can be supported by Word documents and Excel (more)

Artursson Wissa, Ulrika

2011-01-01T23:59:59.000Z

368

Product acceptance environmental and destructive testing for reliability.  

SciTech Connect (OSTI)

To determine whether a component is meeting its reliability requirement during production, acceptance sampling is employed in which selected units coming off the production line are subjected to additional environmental and/or destructive tests that are within the normal environment space to which the component is expected to be exposed throughout its life in the Stockpile. This report describes what these tests are and how they are scored for reliability purposes. The roles of screens, Engineering Use Only tests, and next assembly product acceptance testing are also discussed, along with both the advantages and disadvantages of environmental and destructive testing.

Dvorack, Michael A.; Kerschen, Thomas J.; Collins, Elmer W.

2007-08-01T23:59:59.000Z

369

National Ingition Facility subsystem design requirements optics subsystems SSDR 1.6  

SciTech Connect (OSTI)

This Subsystems Design Requirement (SSDR) document specifies the functions to be performed and the subsystems design requirements for the major optical components. These optical components comprise those custom designed and fabricated for amplification and transport of the full aperture NIF beam and does not include those off-the-shelf components that may be part of other optical sub-systems (i.e. alignment or diagnostic systems). This document also describes the optical component processing requirements and the QA/damage testing necessary to ensure that the optical components meet or exceed the requirements.

English, R.E.

1996-08-30T23:59:59.000Z

370

Using Hybrid Algorithm For Pareto Efficient Multi-Objective Test Suite Minimisation  

E-Print Network [OSTI]

Using Hybrid Algorithm For Pareto Efficient Multi-Objective Test Suite Minimisation Shin Yoo & Mark Harman King's College London, Strand, London, WC2R 2LS, UK Abstract Test suite minimisation techniques seek to reduce the effort required for regression testing by selecting a subset of test suites

Singer, Jeremy

371

Power-Aware SoC Test Planning for Effective Utilization of Port-Scalable Testers  

E-Print Network [OSTI]

circuits contain embedded cores with different scan frequen- cies. To better meet the test requirements if the resulting test access architecture reduces the bit-width used to access it. We present a scalable test planning technique that exploits port scalability of testers to reduce SoC test time. We compare

Chakrabarty, Krishnendu

372

Test point selection using wavelet transforms for mixed-signal circuit  

E-Print Network [OSTI]

With growing complexity of today's ICs, it is desirable to improve traditional testing methods to increase the throughput. If one can select a limited number of points to test the circuit from a given test pattern, the time required for testing can...

Huang, Hsing-Chiang

2012-06-07T23:59:59.000Z

373

Wind Technology Testing Center Acquires New Blade Fatigue Test...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Technology Testing Center Acquires New Blade Fatigue Test System Wind Technology Testing Center Acquires New Blade Fatigue Test System August 1, 2013 - 4:33pm Addthis This is an...

374

SOFTWARE TESTING, VERIFICATION AND RELIABILITY Softw. Test. Verif. Reliab. (2014)  

E-Print Network [OSTI]

. An industrial case study using reactor protection system software shows that the automatically generated test defined by the International Electrotechnical Commission (IEC). Industrial FBD testing relies mostlySOFTWARE TESTING, VERIFICATION AND RELIABILITY Softw. Test. Verif. Reliab. (2014) Published online

375

Advanced Vehicle Testing & Evaluation  

Broader source: Energy.gov (indexed) [DOE]

Requirements Total Project; 33,088,218 EZ Messenger DOE Share; 26,400,000 Total Transit Cost Share; 6,688,218 Idaho National Laboratory Current Auth; 6,351,700 Argonne...

376

Analysis of drill stem test data  

E-Print Network [OSTI]

LI8RARY A s IN CNLLEGE OF TEXAS ANALYSIS OF DRILL STEM TEST DATA A THESIS By ALBIN J. ZAK, JR. Submitted to the Graduate School of the Agricultural and Mechanical College of Texas in partial fulfillment of the requirements for the degree... of MASTER OF SCIENCE August, 1956 Major Subject: Petroleum Engineering ANALYSIS OF DRILL STEM TEST DATA A THESIS ALBIN J. ZAK, JR. Approved as to style and content by; h irman of Committee Head of Department TABLE OF CONTENTS Page I. ABSTRAC...

Zak, Albin Joseph

1956-01-01T23:59:59.000Z

377

Safety of magnetic fusion facilities: Requirements  

SciTech Connect (OSTI)

This Standard identifies safety requirements for magnetic fusion facilities. Safety functions are used to define outcomes that must be achieved to ensure that exposures to radiation, hazardous materials, or other hazards are maintained within acceptable limits. Requirements applicable to magnetic fusion facilities have been derived from Federal law, policy, and other documents. In addition to specific safety requirements, broad direction is given in the form of safety principles that are to be implemented and within which safety can be achieved.

NONE

1996-05-01T23:59:59.000Z

378

Nutrient Requirements of the Cow and Calf.  

E-Print Network [OSTI]

protein and minimum megacalories of digestible energy per pound of feed. The section on travel, fetal deaelopment and gain shows the quality of forage 'needed to furnish the energy and protetin for these activities. The section on milk production...NUTRIENT REQUIREMENTS of the Cow and Calf TEXAS A&M UNIVERSITY TEXAS AGRICULTURAL EXTENSION SERVICE, J. E. Hutchison, Director College Station, Texas I contents I-. Energy Requirements, 3 Protein Requirements, 8 Daily Nutrient...

Maddox, L. A. Jr.

1965-01-01T23:59:59.000Z

379

Core Science Requirement Final Document Page 1 THE CORE SCIENCE REQUIREMENT and  

E-Print Network [OSTI]

Core Science Requirement ­ Final Document ­ Page 1 THE CORE SCIENCE REQUIREMENT and MENDEL SCIENCE EXPERIENCE COURSES Core requirement of 2 semesters of science with laboratory; requirement to be met by the end of the sophomore year Rationale Science literacy is an integral part of the intellectual

Lagalante, Anthony F.

380

Committee Role Required/ Optional CSM faculty status Department Advisor Required Full time Home Department  

E-Print Network [OSTI]

Committee Role Required/ Optional CSM faculty status Department Advisor Required Full time Home faculty status Department Advisor Required Full time Home Dept* or familiar with area of study Co-Advisor to specify on form Full time-cannot be advisor or co-advisor Committee Role Required/ Optional CSM faculty

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Field Testing of a Wet FGD Additive for Enhanced Mercury Control - Pilot-Scale Test Results  

SciTech Connect (OSTI)

This Topical Report summarizes progress on Cooperative Agreement DE-FC26-04NT42309, ''Field Testing of a Wet FGD Additive.'' The objective of the project is to demonstrate the use of a flue gas desulfurization (FGD) additive, Degussa Corporation's TMT-15, to prevent the reemissions of elemental mercury (Hg{sup 0}) in flue gas exiting wet FGD systems on coal-fired boilers. Furthermore, the project intends to demonstrate that the additive can be used to precipitate most of the mercury (Hg) removed in the wet FGD system as a fine TMT salt that can be separated from the FGD liquor and bulk solid byproducts for separate disposal. The project will conduct pilot and full-scale tests of the TMT-15 additive in wet FGD absorbers. The tests are intended to determine required additive dosage requirements to prevent Hg{sup 0} reemissions and to separate mercury from the normal FGD byproducts for three coal types: Texas lignite/Power River Basin (PRB) coal blend, high-sulfur Eastern bituminous coal, and low-sulfur Eastern bituminous coal. The project team consists of URS Group, Inc., EPRI, TXU Generation Company LP, Southern Company, and Degussa Corporation. TXU Generation has provided the Texas lignite/PRB co-fired test site for pilot FGD tests, Monticello Steam Electric Station Unit 3. Southern Company is providing the low-sulfur Eastern bituminous coal host site for wet scrubbing tests, as well as the pilot and full-scale jet bubbling reactor (JBR) FGD systems to be tested. A third utility, to be named later, will provide the high-sulfur Eastern bituminous coal full-scale FGD test site. Degussa Corporation is providing the TMT-15 additive and technical support to the test program. The project is being conducted in six tasks. Of the six project tasks, Task 1 involves project planning and Task 6 involves management and reporting. The other four tasks involve field testing on FGD systems, either at pilot or full scale. The four tasks include: Task 2 - Pilot Additive Testing in Texas Lignite Flue Gas; Task 3 - Full-scale FGD Additive Testing in High Sulfur Eastern Bituminous Flue Gas; Task 4 - Pilot Wet Scrubber Additive Tests at Yates; and Task 5 - Full-scale Additive Tests at Plant Yates. This topical report presents the results from the Task 2 and Task 4 pilot-scale additive tests. The Task 3 and Task 5 full-scale additive tests will be conducted later in calendar year 2006.

Gary M. Blythe

2006-03-01T23:59:59.000Z

382

Tests show benefits of new polished rod lubricator  

SciTech Connect (OSTI)

Tests with beam-pumped oil wells, completed over 7-months at the Rocky Mountain Oilfield Testing Center (Rmotc), indicated that a new lubricator supplying supplementary grease to polished rods lowered operating costs by reducing maintenance, material costs, and electrical requirements. It also minimized polished rod corrosion and enhanced pollution control. The lubricator worked with extremely hot fluids and in adverse weather conditions. The paper describes Rmotc, the new lubrication, the test wells, and cost reduction.

Tyler, M.R.; Khatib, A. [Rocky Mountain Oilfield Testing Center, Casper, WY (United States)

1995-04-10T23:59:59.000Z

383

Allocating Variability and Reserve Requirements (Presentation)  

SciTech Connect (OSTI)

This presentation describes how you could conceivably allocate variability and reserve requirements, including how to allocate aggregation benefits. Conclusions of this presentation are: (1) Aggregation provides benefits because individual requirements are not 100% correlated; (2) Method needed to allocate reduced requirement among participants; (3) Differences between allocation results are subtle - (a) Not immediately obvious which method is 'better'; (b) Many are numerically 'correct', they sum to the physical requirement; (c) Many are not 'fair', Results depend on sub-aggregation and/or the order individuals are included; and (4) Vector allocation method is simple and fair.

Kirby, B.; King, J.; Milligan, M.

2011-10-01T23:59:59.000Z

384

Personnel Security - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2.2 Admin Chg 1, Personnel Security by Mark Pekrul Functional areas: Administrative Change, Personnel Security, Safety and Security The order establishes requirements that will...

385

Personnel Security - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

72.2 Chg 1, Personnel Security by Mark Pekrul Functional areas: Personnel Security, Security, Human Capital The order establishes requirements that will enable DOE to operate a...

386

Transmission Reassignment Reporting Requirement - April 2, 2014  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CommitteesTeams Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Transmission Reassignment Reporting Requirement This notice...

387

Facility Safety - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Change, Safety, The order establishes facility and programmatic safety requirements for nuclear and explosives safety design criteria, fire protection, criticality safety,...

388

Automotive Turbocharging: Industrial Requirements and Technology...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

performance will be difficult to achieve requires a proper understanding of the trade-offs and engine effects and impacts must be part of turbocharger development...

389

Federal / State Legislative & Regulatory Changes Required for...  

Energy Savers [EERE]

Issues Federal and State Blending Restrictions Action by ASTM NCWM to address higher ethanol blends Federal State Legislative & Regulatory Changes Required for Introduction of...

390

FEMINIST STUDIES MAJOR REQUIREMENTS Name _______________________________________ Email_____________________  

E-Print Network [OSTI]

of intended graduation ____________________ Feminist Studies students must complete 11 courses within year) FMST 195 (required for Thesis or Project) Indicate topic: 9/17/12 #12;

California at Santa Cruz, University of

391

Contact Form - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Contact Form by Diane Johnson Directives are the Department of Energy's Primary means of establishing policies, requirements, responsibilities, and procedures for Departmental...

392

Requirements Governing Water Quality Standards (West Virginia)  

Broader source: Energy.gov [DOE]

This rule establishes the requirements governing the discharge or deposit of sewage, industrial wastes and other wastes into waters and establishes water quality standards.

393

The Schedule - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

funds are required. This chapter will briefly discuss some scheduling basics. g4301-1chp12.pdf -- PDF Document, 60 KB Writer: John Makepeace Subjects: Administration Management...

394

Supervisory Training Requirements | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Requirements The Office of Learning and Workforce Development has developed an inventory of training and developmental activities that will meet the supervisory training...

395

The Access Almanac: Solar Parking Requirements  

E-Print Network [OSTI]

these requirements. Solar panels in parking lots will startto install solar panels on their parking lots the option tosupport solar panels. Therefore, parking lots will generate

Shoup, Donald

2012-01-01T23:59:59.000Z

396

DOE Office of Science Exascale Requirements Reviews  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2020-2025 The three DOE Office of Advanced Scientific Computing (ASCR) High Performance Computing (HPC) Facilities are conducting a series of six Exascale Requirements...

397

Cooperating Agencies in Implementing the Procedural Requirements...  

Energy Savers [EERE]

of Federal and non-federal cooperating agencies in the preparation of analyses and documentation required by the National Environmental Policy Act (NEPA), and to ensure that...

398

Documentation Requirements for Pressurized Experiment Equipment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Documentation Requirements for Pressurized Experiment Apparatus PSSC NOTE01 15-Jan-2013 When bringing a piece of apparatus to the APS for an experiment that will involve pressure,...

399

Advancing Toward Test Automation through Effective Manual Testing  

E-Print Network [OSTI]

. This paper will walk through a best practice scenario for using Manual Tester to more naturally organize test Automation through Effective Manual Testing Bob Levy, Lead Product Manager ­ Functional Test Dennis ElenburgAdvancing Toward Test Automation through Effective Manual Testing May 2005 Advancing Toward Test

400

Edit Test Options Page 1 Edit Test Options  

E-Print Network [OSTI]

Edit Test Options Page 1 Edit Test Options Format Test Information 1. Enter a Name for the Test. 2. Choose a color for the title text of the Test. (Optional) 3. Enter a Description in the Text Box. The description is visible to Students before they click on the link to take the Test. (Optional) 4. If you want

Xu, Shouhuai

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Test reports for K Basins vertical fuel handling tools  

SciTech Connect (OSTI)

The vertical fuel handling tools, for moving N Reactor fuel elements, were tested in the 305 Building Cold Test Facility (CTF) in the 300 Area. After fabrication was complete, the tools were functionally tested in the CTF using simulated N Reactor fuel rods (inner and outer elements). The tools were successful in picking up the simulated N Reactor fuel rods. These tools were also load tested using a 62 pound dummy to test the structural integrity of each assembly. The tools passed each of these tests, based on the performance objectives. Finally, the tools were subjected to an operations acceptance test where K Basins Operations personnel operated the tool to determine its durability and usefulness. Operations personnel were satisfied with the tools. Identified open items included the absence of a float during testing, and documentation required prior to actual use of the tools in the 100 K fuel storage basin.

Meling, T.A.

1995-02-01T23:59:59.000Z

402

Upgrade of the cryogenic CERN RF test facility  

SciTech Connect (OSTI)

With the large number of superconducting radiofrequency (RF) cryomodules to be tested for the former LEP and the present LHC accelerator a RF test facility was erected early in the 1990s in the largest cryogenic test facility at CERN located at Point 18. This facility consisted of four vertical test stands for single cavities and originally one and then two horizontal test benches for RF cryomodules operating at 4.5 K in saturated helium. CERN is presently working on the upgrade of its accelerator infrastructure, which requires new superconducting cavities operating below 2 K in saturated superfluid helium. Consequently, the RF test facility has been renewed in order to allow efficient cavity and cryomodule tests in superfluid helium and to improve its thermal performances. The new RF test facility is described and its performances are presented.

Pirotte, O.; Benda, V.; Brunner, O.; Inglese, V.; Maesen, P.; Vullierme, B. [CERN - European Organization for Nuclear Research, CH-1211 Geneva 23 (Switzerland); Koettig, T. [ESS - European Spallation Source, Box 176, 221 00 Lund (Sweden)

2014-01-29T23:59:59.000Z

403

Special Nuclear Material Portal Monitoring at the Nevada Test Site  

SciTech Connect (OSTI)

Prior to April 2007, acceptance and performance testing of the various Special Nuclear Material (SNM) monitoring devices at the Nevada Test Site (NTS) was performed by the Radiological Health Instrumentation department. Calibration and performance testing on the PM-700 personnel portal monitor was performed, but there was no test program for the VM-250 vehicle portal monitor. The handheld SNM monitors, the TSA model 470B, were being calibrated annually, but there was no performance test program. In April of 2007, the Material Control and Accountability Manager volunteered to take over performance testing of all SNM portal monitors at NTS in order to strengthen the program and meet U.S. Department of Energy Order requirements. This paper will discuss the following activities associated with developing a performance testing program: changing the culture, learning the systems, developing and implementing procedures, troubleshooting and repair, validating the process, physical control of equipment, acquisition of new systems, and implementing the performance test program.

DeAnn Long; Michael Murphy

2008-07-01T23:59:59.000Z

404

Instrumentation requirements from the user's view. [For airbreathing hypersonic engines  

SciTech Connect (OSTI)

The use of combustor diagnostics is considered from the point of view of demonstration of performance of an airbreathing hypersonic engine. The basic need is seen to be that of providing the data necessary to verify performance predictions for the engine as installed in the airplane. This necessitates the use of a diagnostics capability that can provide the inputs required by the computational analyses that will be used to assess this performance. Because of the cost of ground test facilities, a premium is placed on measurement technique reliability and redundancy of instrumentation. A mix of nonintrusive optical techniques and probe-based measurements is seen to be the best approach using current diagnostics capability; one such instrument mix is outlined for a ramjet/scramjet test program. 11 references.

Harsha, P.T.

1988-01-01T23:59:59.000Z

405

Los Alamos Novel Rocket Design Flight Tested  

ScienceCinema (OSTI)

Los Alamos National Laboratory scientists recently flight tested a new rocket design that includes a high-energy fuel and a motor design that also delivers a high degree of safety. Researchers will now work to scale-up the design, as well as explore miniaturization of the system, in order to exploit all potential applications that would require high-energy, high-velocity, and correspondingly high safety margins.

Tappan, Bryce

2015-01-05T23:59:59.000Z

406

Test Procedure for 170.306.h Advance Directives APPROVED Version 1.1 September 24, 2010  

E-Print Network [OSTI]

Test Procedure for §170.306.h Advance Directives APPROVED Version 1.1 September 24, 2010 1 Test Procedure for §170.306 (h) Advance Directives This document describes the test procedure for evaluating Register on July 28, 2010. The document2 is organized by test procedure and derived test requirements

407

Solutions to Test 2  

E-Print Network [OSTI]

Jan 14, 2015 ... Test 2. Fall 2014. October 28, 2014. 1. Joon is going to buy a 10 year callable bond. The bond matures for 15,000 and pays semi-annual.

Microsoft account

2015-01-14T23:59:59.000Z

408

CASL Test Stand Experience  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The Test Stand concept was included in the CASL proposal to the US Department of Energy (DoE) as an important means to achieve early deployment of the M&S technology and...

409

Solutions to Test 3  

E-Print Network [OSTI]

Math 373. Test 3. Spring 2014. April 8, 2014. 1. Yujin can buy each of the following bonds for a price of P . The bonds are: a. A 10 year zero coupon bond...

jeffb_000

2014-08-16T23:59:59.000Z

410

Solutions to Test 1  

E-Print Network [OSTI]

MATH 373. Spring 2014. Test 1. February 18, 2013. 1. Amar wants to accumulate 1 million (1,000,000) by the time that he is 50 years old. Amar is currently 20...

jeffb_000

2014-08-16T23:59:59.000Z

411

MA 266 Practice Test  

E-Print Network [OSTI]

Feb 18, 2015 ... INSTRUCTIONS in the Test. 1. Do not open this exam booklet until told to do so. 2. There are 6 or 7 problems - one per page. 3. Show all your...

2015-02-10T23:59:59.000Z

412

Solutions to Test 2  

E-Print Network [OSTI]

STAT 479. Test 2. Spring 2014. April 1, 2014. 1. (5 points) You are given the following grouped data: Amount of claims. Number of Claims. 0 to 1000. 8. 1000 to...

jeffb_000

2014-04-14T23:59:59.000Z

413

Solutions to Test 1  

E-Print Network [OSTI]

Test 1. STAT 47201. Fall 2014. October 7, 2014. 1. You are given: i. Mortality follows the illustrative life table ii. 6% i = Calculate: a. The actuarial present value

Microsoft account

2014-10-24T23:59:59.000Z

414

Solutions to Test 1  

E-Print Network [OSTI]

Test 1. September 26, 2013. 1. Zach buys a billiards table for his apartment. The cost of the table is 4000 and he uses a loan to pay for the table. The loan will be...

jeffb_000

2014-02-16T23:59:59.000Z

415

Solutions to Test 2  

E-Print Network [OSTI]

Test 2. Spring 2013. March 5, 2013. 1. Jana purchased a 20 year zero coupon bond for 20,000. The bond matures for 70,000. Christian borrowed 50,000 to be...

416

Solutions to Test 1  

E-Print Network [OSTI]

March 9, 2014. Math 373. Test 1. Fall 2012. September 27, 2012. 1. Meng takes out a loan to buy a new motorcycle. The amount of the loan is 12,500. Meng will.

Owner

2014-03-09T23:59:59.000Z

417

Solutions to Test 2  

E-Print Network [OSTI]

March 27, 2014. Math 373. Test 2. Fall 2013. October 17, 2013. 1. You are given the following table of interest rates: Year 1. Year 2. Year 3. Portfolio. Year. 2007.

jeffb_000

2014-03-26T23:59:59.000Z

418

EARTH SCIENCES Lower-Division Requirements  

E-Print Network [OSTI]

2012-2013 EARTH SCIENCES Lower-Division Requirements Math 20A_____ 20B_____ 20C_____ 20D (BILD 3) _____ SIO 50* _____ Group A: Earth Science Upper-Division Core Requirements (all courses _____ Introduction to Geophysics SIO 104 _____ Paleobiology and History of Life* Group B: Upper-Division Earth

Constable, Steve

419

Data Modelling and Database Requirements Geographical Data  

E-Print Network [OSTI]

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 Brief history 15 Definitions 15 The three-schema architecture 16 Features/services of databaseData Modelling and Database Requirements for Geographical Data Håvard Tveite January, 1997 #12-Model Substitution, and adds new symbology that is relevant for geographical data. Database system requirements

420

Contracting Requirements and Why They Matter  

E-Print Network [OSTI]

Contracting Requirements and Why They Matter Presented by David E. Broome, Jr., General Counsel Amy's legally binding #12;Getting It Wrong · Case: Your unit contracts with Fun Corp (FC) to provide Student Fun Fair on campus. Contract requires that University indemnify FC for injuries/damage/liability arising

Howitt, Ivan

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Modelling the Contribution Structure Underlying Requirements  

E-Print Network [OSTI]

Modelling the Contribution Structure Underlying Requirements Orlena C. Z. Gotel & Anthony C, and hence trace, those who have contributed in the production and refinement of the requirements illustrate the relationship between RT and software quality. In Section 3, we show the restricted impact

Gotel, Olly

422

BIOLOGY MINOR WORKSHEET REQUIRED BIOLOGY COURSES  

E-Print Network [OSTI]

BIOLOGY MINOR WORKSHEET 2008-2013 REQUIRED BIOLOGY COURSES: BIOL 115N General Biology I 4 ________ BIOL 116N General Biology II 4 ________ Upon completion of BIOL 115N and BIOL 116N, the Biology Minor requires the successful completion of a minimum of 12 credit-hours of Biology coursework at the advanced

423

What is required for a Philosophy Major?  

E-Print Network [OSTI]

PHILOSOPHY What is required for a Philosophy Major? at Northern Kentucky University For students who entered the University in 2011. The major in philosophy requires a total of at least thirty (30/PHI 280 Classical and Medieval Philosophy (fall) · PHI 355 Socrates and Plato (spring 2014) History II

Acosta, Charles A.

424

What is required for a Philosophy Major?  

E-Print Network [OSTI]

PHILOSOPHY What is required for a Philosophy Major? at Northern Kentucky University For students who entered the University before 2011. The major in philosophy requires a total of at least thirty or PHI 265 Logic (every semester) · PHI 180 or PHI 280 Classical and Medieval Philosophy (fall) · PHI 185

Acosta, Charles A.

425

What is required for a Philosophy Major?  

E-Print Network [OSTI]

PHILOSOPHY What is required for a Philosophy Major? at Northern Kentucky University For students who entered the University in 2012. The major in philosophy requires a total of at least thirty (30) · PHI 280 Classical and Medieval Philosophy (offered fall) · PHI 285 Modern and Contemporary Philosophy

Acosta, Charles A.

426

What is required for a Philosophy Major?  

E-Print Network [OSTI]

PHILOSOPHY What is required for a Philosophy Major? at Northern Kentucky University For students who entered the University in (or after) 2013. The major in philosophy requires a total of at least (every semester) · PHI 280 Classical and Medieval Philosophy (offered fall) · PHI 285 Modern

Acosta, Charles A.

427

Requirements, possible alternatives & international NEUTRON SCATTERING  

E-Print Network [OSTI]

Requirements, possible alternatives & international NEUTRON SCATTERING DETECTORS for Rob Dimeo NIST neutron scattering instruments are the most demanding require background low #12;#12;The Helium-3 Supply Crisis ­ Alternative Techniques to Helium-3 based Detectors for Neutron Scattering Applications

Dimeo, Robert M.

428

MONITORED GEOLOGIC REPOSITORY SYSTEMS REQUIREMENTS DOCUMENT  

SciTech Connect (OSTI)

This document establishes the Monitored Geologic Repository system requirements for the U.S. Department of Energy's (DOE's) Civilian Radioactive Waste Management System (CRWMS). These requirements are based on the ''Civilian Radioactive Waste Management System Requirements Document'' (CRD) (DOE 2004a). The ''Monitored Geologic Repository Systems Requirements Document'' (MGR-RD) is developed in accordance with LP-3.3 SQ-OCRWM, ''Preparation, Review, and Approval of Office of Repository Development Requirements Document''. As illustrated in Figure 1, the MGR-RD forms part of the DOE Office of Civilian Radioactive Waste Management Technical Requirements Baseline. Revision 0 of this document identifies requirements for the current phase of repository design that is focused on developing a preliminary design for the repository and will be included in the license application submitted to the U.S. Nuclear Regulatory Commission for a repository at Yucca Mountain in support of receiving a construction authorization and subsequent operating license. As additional information becomes available, more detailed requirements will be identified in subsequent revisions to this document.

V. Trebules

2006-06-02T23:59:59.000Z

429

Ongoing Software Development without Classical Requirements  

E-Print Network [OSTI]

systems without overt requirements artifacts or processes, contrary to expectations resulting from are evolved and sustained in this way yet provide quality and rich functional capabilities to users In 2002 one of us (Scacchi) published a study of require- ments practices and artifacts in four open

Scacchi, Walt

430

Conduct of Operations Requirements for DOE Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

"To provide requirements and guidelines for Departmental Elements, including the National Nuclear Security Administration (NNSA), to use in developing directives, plans, and/or procedures relating to the conduct of operations at DOE facilities. The implementation of these requirements and guidelines should result in improved quality and uniformity of operations. Change 2, 10-23-2001. Canceled by DOE O 422.1.

1990-07-09T23:59:59.000Z

431

A Residual Mass Ballistic Testing Method to Compare Armor Materials or Components (Residual Mass Ballistic Testing Method)  

SciTech Connect (OSTI)

A statistics based ballistic test method is presented for use when comparing multiple groups of test articles of unknown relative ballistic perforation resistance. The method is intended to be more efficient than many traditional methods for research and development testing. To establish the validity of the method, it is employed in this study to compare test groups of known relative ballistic performance. Multiple groups of test articles were perforated using consistent projectiles and impact conditions. Test groups were made of rolled homogeneous armor (RHA) plates and differed in thickness. After perforation, each residual projectile was captured behind the target and its mass was measured. The residual masses measured for each test group were analyzed to provide ballistic performance rankings with associated confidence levels. When compared to traditional V50 methods, the residual mass (RM) method was found to require fewer test events and be more tolerant of variations in impact conditions.

Benjamin Langhorst; Thomas M Lillo; Henry S Chu

2014-05-01T23:59:59.000Z

432

FANTM, the First Article NIF Test Module  

SciTech Connect (OSTI)

Designing and developing the 1.7 to 2.1-MJ Power Conditioning System (PCS), that will power the flashlamps of the main and power amplifiers for the National Ignition Facility (NIF) lasers, is one of several responsibilities assumed by Sandia National Labs (SNL) in support of the NIF Project. Maxwell Physics International has been a partner in this process. The NIF is currently being constructed at Lawrence Livermore National Labs (LLNL). The test facility that has evolved over the last three years to satisfy the project requirements is called FANTM, for the First Article NIF Test Module. It was built at SNL and operated for about 17,000 shots to demonstrate component performance expectations over the lifetime of NIF. A few modules similar to the one shown in Fig. 1 will be used initially in the amplifier test phase of the project. The final full NIF system will require at least 192 of them in four capacitor bays. This paper briefly summarizes the final design of the FANTM facility and compares its performance with the predictions of circuit simulations for both normal operation and fault-mode response. Applying both the measured and modeled power pulse waveforms as input to a physics-based, semi-empirical amplifier gain code indicates that the 20-capacitor PCS can satisfy the NIF requirement for an average gain coefficient of 5.00 %/cm and can exceed 5.20 %/cm with 24 capacitors.

HAMMON,JUD; HARJES,HENRY C.; MOORE,WILLIAM B. S.; SMITH,DAVID L.; WILSON,J. MICHAEL

1999-11-30T23:59:59.000Z

433

Diesel Engine Idling Test  

SciTech Connect (OSTI)

In support of the Department of Energys FreedomCAR and Vehicle Technology Program Office goal to minimize diesel engine idling and reduce the consumption of millions of gallons of diesel fuel consumed during heavy vehicle idling periods, the Idaho National Laboratory (INL) conducted tests to characterize diesel engine wear rates caused by extended periods of idling. INL idled two fleet buses equipped with Detroit Diesel Series 50 engines, each for 1,000 hours. Engine wear metals were characterized from weekly oil analysis samples and destructive filter analyses. Full-flow and the bypass filter cartridges were removed at four stages of the testing and sent to an oil analysis laboratory for destructive analysis to ascertain the metals captured in the filters and to establish wear rate trends. Weekly samples were sent to two independent oil analysis laboratories. Concurrent with the filter analysis, a comprehensive array of other laboratory tests ascertained the condition of the oil, wear particle types, and ferrous particles. Extensive ferrogram testing physically showed the concentration of iron particles and associated debris in the oil. The tests results did not show the dramatic results anticipated but did show wear trends. New West Technologies, LLC, a DOE support company, supplied technical support and data analysis throughout the idle test.

Larry Zirker; James Francfort; Jordon Fielding

2006-02-01T23:59:59.000Z

434

Tracers and Tracer Testing: Design, Implementation, Tracer Selection, and Interpretation Methods  

SciTech Connect (OSTI)

Conducting a successful tracer test requires adhering to a set of steps. The steps include identifying appropriate and achievable test goals, identifying tracers with the appropriate properties, and implementing the test as designed. When these steps are taken correctly, a host of tracer test analysis methods are available to the practitioner. This report discusses the individual steps required for a successful tracer test and presents methods for analysis. The report is an overview of tracer technology; the Suggested Reading section offers references to the specifics of test design and interpretation.

G. Michael Shook; Shannon L.; Allan Wylie

2004-01-01T23:59:59.000Z

435

Test Plan for Characterization Testing of SO2-depolarized Electrolyzer Cell Designs  

SciTech Connect (OSTI)

SRNL received funding in FY 2005 to test the Hybrid Sulfur (HyS) Process for generating hydrogen. This technology employs an electrolyzer that uses a sulfur dioxide depolarized anode to greatly reduce the electrical energy requirement. The required current is the same as for conventional electrolysis of water, but the required cell voltage is reduced. The electrolyzer is a key part of HyS technology. Completing the material loop for HyS requires a high temperature decomposition of sulfuric acid to regenerate the sulfur dioxide gas needed for the anode reaction. Oxygen is also produced and could be sold. The decomposition of sulfuric acid is being studied by others in a separately funded task. It is not included in this SRNL task.

Steimke, J. L.

2006-02-15T23:59:59.000Z

436

Jim Duckworth, WPI Verilog for Testing -Module 61 Test Benches (Test Fixtures)  

E-Print Network [OSTI]

Jim Duckworth, WPI Verilog for Testing - Module 61 Test Benches (Test Fixtures) Verilog for Testing #12;Jim Duckworth, WPI Verilog for Testing - Module 62 Overview · We have concentrated on Verilog for synthesis · Can also use Verilog as a test language · Very important to conduct comprehensive verification

Huang, Xinming

437

The Modified Sudden Death Test: Planning Life Tests with a Limited Number of Test Positions  

E-Print Network [OSTI]

The Modified Sudden Death Test: Planning Life Tests with a Limited Number of Test Positions Francis for Nondestructive Evaluation Iowa State University Ames, IA 50011 ABSTRACT: We present modified sudden death test (MSDT) plans to address the problem of limited testing positions in life tests. A single MSDT involves

438

The Modi ed Sudden Death Test: Planning Life Tests with a Limited Number of Test Positions  

E-Print Network [OSTI]

The Modi ed Sudden Death Test: Planning Life Tests with a Limited Number of Test Positions Francis for Nondestructive Evaluation Iowa State University Ames, IA 50011 ABSTRACT: We present modi ed sudden death test (MSDT) plans to address the problem of limited testing positions in life tests. A single MSDT involves

439

Architectures of Test Automation 1 High Volume Test AutomationHigh Volume Test Automation  

E-Print Network [OSTI]

Architectures of Test Automation 1 High Volume Test AutomationHigh Volume Test Automation Cem Kaner Institute of Technology October 2003 #12;Architectures of Test Automation 2 Acknowledgements developed a course on test automation architecture, and in the Los Altos Workshops on Software Testing

440

Nevada Test Site Environmental Report 2003  

SciTech Connect (OSTI)

The Nevada Test Site Environmental Report 2003 was prepared by Bechtel Nevada to meet the requirements and guidelines of the U.S. Department of Energy and the information needs of the public. This report is meant to be useful to members of the public, public officials, regulators, and Nevada Test Site contractors. The Executive Summary strives to present in a concise format the purpose of the document, the NTS mission and major programs, a summary of radiological releases and doses to the public resulting from site operations, a summary of non-radiological releases, and an overview of the Nevada Test Site Environmental Management System. The Executive Summary, combined with the following Compliance Summary, are written to meet all the objectives of the report and to be stand-alone sections for those who choose not to read the entire document.

Bechtel Nevada

2004-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Iowa Central Quality Fuel Testing Laboratory  

SciTech Connect (OSTI)

The objective of this project is to finalize the creation of an independent quality fuel testing laboratory on the campus of Iowa Central Community College in Fort Dodge, Iowa that shall provide the exploding biofuels industry a timely and cost-effective centrally located laboratory to complete all state and federal fuel and related tests that are required. The recipient shall work with various state regulatory agencies, biofuel companies and state and national industry associations to ensure that training and testing needs of their members and American consumers are met. The recipient shall work with the Iowa Department of Ag and Land Stewardship on the development of an Iowa Biofuel Quality Standard along with the Development of a standard that can be used throughout industry.

Heach, Don; Bidieman, Julaine

2013-09-30T23:59:59.000Z

442

Future Transient Testing of Advanced Fuels  

SciTech Connect (OSTI)

The transient in-reactor fuels testing workshop was held on May 45, 2009 at Idaho National Laboratory. The purpose of this meeting was to provide a forum where technical experts in transient testing of nuclear fuels could meet directly with technical instrumentation experts and nuclear fuel modeling and simulation experts to discuss needed advancements in transient testing to support a basic understanding of nuclear fuel behavior under off-normal conditions. The workshop was attended by representatives from Commissariat l'nergie Atomique CEA, Japanese Atomic Energy Agency (JAEA), Department of Energy (DOE), AREVA, General Electric Global Nuclear Fuels (GE-GNF), Westinghouse, Electric Power Research Institute (EPRI), universities, and several DOE national laboratories. Transient testing of fuels and materials generates information required for advanced fuels in future nuclear power plants. Future nuclear power plants will rely heavily on advanced computer modeling and simulation that describes fuel behavior under off-normal conditions. TREAT is an ideal facility for this testing because of its flexibility, proven operation and material condition. The opportunity exists to develop advanced instrumentation and data collection that can support modeling and simulation needs much better than was possible in the past. In order to take advantage of these opportunities, test programs must be carefully designed to yield basic information to support modeling before conducting integral performance tests. An early start of TREAT and operation at low power would provide significant dividends in training, development of instrumentation, and checkout of reactor systems. Early start of TREAT (2015) is needed to support the requirements of potential users of TREAT and include the testing of full length fuel irradiated in the FFTF reactor. The capabilities provided by TREAT are needed for the development of nuclear power and the following benefits will be realized by the refurbishment and restart of TREAT. TREAT is an absolute necessity in the suite of reactor fuel test capabilities TREAT yields valuable information on reactivity effects, margins to failure, fuel dispersal, and failure propagation Most importantly, interpretation of TREAT experiment results is a stringent test of the integrated understanding of fuel performance.

Jon Carmack

2009-09-01T23:59:59.000Z

443

C-106 tank process ventilation test  

SciTech Connect (OSTI)

Project W-320 Acceptance Test Report for tank 241-C-106, 296-C-006 Ventilation System Acceptance Test Procedure (ATP) HNF-SD-W320-012, C-106 Tank Process Ventilation Test, was an in depth test of the 296-C-006 ventilation system and ventilation support systems required to perform the sluicing of tank C-106. Systems involved included electrical, instrumentation, chiller and HVAC. Tests began at component level, moved to loop level, up to system level and finally to an integrated systems level test. One criteria was to perform the test with the least amount of risk from a radioactive contamination potential stand point. To accomplish this a temporary configuration was designed that would simulate operation of the systems, without being connected directly to the waste tank air space. This was done by blanking off ducting to the tank and connecting temporary ducting and an inlet air filter and housing to the recirculation system. This configuration would eventually become the possible cause of exceptions. During the performance of the test, there were points where the equipment did not function per the directions listed in the ATP. These events fell into several different categories. The first and easiest problems were field configurations that did not match the design documentation. This was corrected by modifying the field configuration to meet design documentation and reperforming the applicable sections of the ATP. A second type of problem encountered was associated with equipment which did not operate correctly, at which point an exception was written against the ATP, to be resolved later. A third type of problem was with equipment that actually operated correctly but the directions in the ATP were in error. These were corrected by generating an Engineering Change Notice (ECN) against the ATP. The ATP with corrected directions was then re-performed. A fourth type of problem was where the directions in the ATP were as the equipment should operate, but the design of the equipment was not correct for that type of operation. To correct this problem an ECN was generated against the design documents, the equipment modified accordingly, and the ATP re-performed. The last type of problem was where the equipment operated per the direct ions in the ATP, agreed with the design documents, yet violated requirements of the Basis of Interim Operation (BIO). In this instance a Non Conformance Report (NCR) was generated. To correct problems documented on an NCR, an ECN was generated to modify the design and field work performed, followed by retesting to verify modifications corrected noted deficiencies. To expedite the completion of testing and maintain project schedules, testing was performed concurrent with construct on, calibrations and the performance of other ATP`s.

Bailey, J.W.

1998-07-20T23:59:59.000Z

444

Quality Assurance Source Requirements Traceability Database  

SciTech Connect (OSTI)

At the Yucca Mountain Project the Project Requirements Processing System assists in the management of relationships between regulatory and national/industry standards source criteria, and Quality Assurance Requirements and Description document (DOE/R W-0333P) requirements to create compliance matrices representing respective relationships. The matrices are submitted to the U.S. Nuclear Regulatory Commission to assist in the commission's review, interpretation, and concurrence with the Yucca Mountain Project QA program document. The tool is highly customized to meet the needs of the Office of Civilian Radioactive Waste Management Office of Quality Assurance.

MURTHY, R., NAYDENOVA, A., DEKLEVER, R., BOONE, A.

2006-01-30T23:59:59.000Z

445

Data requirements and acquisition for reservoir characterization  

SciTech Connect (OSTI)

This report outlines the types of data, data sources and measurement tools required for effective reservoir characterization, the data required for specific enhanced oil recovery (EOR) processes, and a discussion on the determination of the optimum data density for reservoir characterization and reservoir modeling. The two basic sources of data for reservoir characterization are data from the specific reservoir and data from analog reservoirs, outcrops, and modern environments. Reservoir data can be divided into three broad categories: (1) rock properties (the container) and (2) fluid properties (the contents) and (3)interaction between reservoir rock and fluid. Both static and dynamic measurements are required.

Jackson, S.; Chang, Ming Ming; Tham, Min.

1993-03-01T23:59:59.000Z

446

Test Anxiety Tips to Ease Your Test Anxiety  

E-Print Network [OSTI]

Test Anxiety Tips to Ease Your Test Anxiety Adapted from: Study Guides and Strategies website, Overcoming test anxiety Test taking can be overwhelming and can cause a lot of anxiety. Try these tips to ease your anxiety through the testing process! Before Approach the exam with confidence Be prepared

Kasman, Alex

447

Model-Based Testing : The Test of Formal Models  

E-Print Network [OSTI]

Model-Based Testing : The Test of Formal Models Jan Tretmans ESI & Radboud University Nijmegen #12;2 Testing (Software) Testing: checking or measuring some quality characteristics of an executing object by performing experiments in a controlled way w.r.t. a specification tester specification SUT System Under Test

448

Office of Evaluation and Testing Test Day Tips  

E-Print Network [OSTI]

Office of Evaluation and Testing Test Day Tips Get plenty of rest the night before the test. The best thing to do the evening before the test is to get a good night's sleep. You've covered the content and you've perfected the skills. Now it's time to get in test mode -- calm, rested, confident, and ready

Brinkmann, Peter

449

Sparkr Blade Test Centre Fatigue tests of wind turbine blades  

E-Print Network [OSTI]

Sparkr Blade Test Centre Fatigue tests of wind turbine blades Flapwise fatigue tests of 3 blades wind load. By turning and oscillating the blade in the horzontal direction, an R-ratio of 1 running at the Sparkr Centre Blade Test Facilities. Fatigue blade tests are performed in order

450

Corrosion testing using isotopes  

DOE Patents [OSTI]

A method is described for determining the corrosion behavior of a material with respect to a medium in contact with the material by: implanting a substantially chemically inert gas in a matrix so that corrosion experienced by the material causes the inert gas to enter the medium; placing the medium in contact with the material; and measuring the amount of inert gas which enters the medium. A test sample of a material whose resistance to corrosion by a medium is to be tested is described composed of: a body of the material, which body has a surface to be contacted by the medium; and a substantially chemically inert gas implanted into the body to a depth below the surface. A test sample of a material whose resistance to corrosion by a medium is to be tested is described composed of: a substrate of material which is easily corroded by the medium, the substrate having a surface; a substantially chemically inert gas implanted into the substrate; and a sheet of the material whose resistance to corrosion is to be tested, the sheet being disposed against the surface of the substrate and having a defined thickness. 3 figs.

Hohorst, F.A.

1995-12-05T23:59:59.000Z

451

Corrosion testing using isotopes  

DOE Patents [OSTI]

A method for determining the corrosion behavior of a material with respect to a medium in contact with the material by: implanting a substantially chemically inert gas in a matrix so that corrosion experienced by the material causes the inert gas to enter the medium; placing the medium in contact with the material; and measuring the amount of inert gas which enters the medium. A test sample of a material whose resistance to corrosion by a medium is to be tested, composed of: a body of the material, which body has a surface to be contacted by the medium; and a substantially chemically inert gas implanted into the body to a depth below the surface. A test sample of a material whose resistance to corrosion by a medium is to be tested, composed of: a substrate of material which is easily corroded by the medium, the substrate having a surface; a substantially chemically inert gas implanted into the substrate; and a sheet of the material whose resistance to corrosion is to be tested, the sheet being disposed against the surface of the substrate and having a defined thickness.

Hohorst, Frederick A. (Idaho Falls, ID)

1995-12-05T23:59:59.000Z

452

Design of a Gas Test Loop Facility for the Advanced Test Reactor  

SciTech Connect (OSTI)

The Office of Nuclear Energy within the U.S. Department of Energy (DOE-NE) has identified the need for irradiation testing of nuclear fuels and materials, primarily in support of the Generation IV (Gen-IV) and Advanced Fuel Cycle Initiative (AFCI) programs. These fuel development programs require a unique environment to test and qualify potential reactor fuel forms. This environment should combine a high fast neutron flux with a hard neutron spectrum and high irradiation temperature. An effort is presently underway at the Idaho National Laboratory (INL) to modify a large flux trap in the Advanced Test Reactor (ATR) to accommodate such a test facility [1,2]. The Gas Test Loop (GTL) Project Conceptual Design was initiated to determine basic feasibility of designing, constructing, and installing in a host irradiation facility, an experimental vehicle that can replicate with reasonable fidelity the fast-flux test environment needed for fuels and materials irradiation testing for advanced reactor concepts. Such a capability will be needed if programs such as the AFCI, Gen-IV, the Next Generation Nuclear Plant (NGNP), and space nuclear propulsion are to meet development objectives and schedules. These programs are beginning some irradiations now, but many call for fast flux testing within this decade.

C. A. Wemple

2005-09-01T23:59:59.000Z

453

Burning Plasma Experiment Requirements Presented to  

E-Print Network [OSTI]

-heating(self-organization?) Test techniques to control and optimize alpha-dominated plasmas. Sustain alpha-dominated plasmas ? Test Control and Optimization Techniques >0.5 0.4 to 0.6 10 >3 1 Sustain Alpha Dominated Plasmas >0, possible guided slower speed pellets) First wall materials Be tiles, no carbon First wall cooling

454

Study of electrostatic charge generation and antistatic additive effects in used transformer oil  

E-Print Network [OSTI]

STUDY OF ELECTROSTATIC CHARGE GENERATION AND ANTISTATIC ADDITIVE EFFECTS IN USED TRANSFORMER OIL A Thesis by FERNANDO RANGEL CLAVIJO Submitted to the Office of Graduate Studies of Texas A8tM University in partial fulfillment... of the requirements for the degree of MASTER OF SCIENCE December 1992 Major Subject: Safety Engineering STUDY OF ELECTROSTATIC CHARGE GENERATION AND ANTISTATIC ADDITIVE EFFECTS IN USED TRANSFORMER OIL A Thesis by FERNANDO RANGEL CLAVIJO Approved as to style...

Rangel Clavijo, Fernando

1992-01-01T23:59:59.000Z

455

Rotating equipment shop testing  

SciTech Connect (OSTI)

Poor performance of machinery after commissioning at first draws comments on whether the purchase specification was in order, whether there were any lapses in stage inspection or whether the performance test procedure was inadequate. Attempts are initiated to find out whether there were any deviations in operating conditions from the purchase specifications, inadvertent lapses in operation or any mistakes by the maintenance Dept. It will be of some interest to mention here a difference between operating companies who have taken over existing plants and engineering consulting companies who have engineered and constructed the plants. The specialist rotating machinery group of engineering consultant companies have a good understanding of what can be achieved at the manufacturer's test facility due to repeated dealings with manufacturers. However, operating company understanding varies from one organization to the next. This article gives an overview of rotating machinery with respect to test objectives and field problems.

Godse, A.G. (Kuwait National Petroleum Co., Shuaiba (KW))

1990-01-01T23:59:59.000Z

456

Energy Efficiency Requirements for State Government  

Broader source: Energy.gov [DOE]

Public Act No. 06-187, enacted in 2006, required the Connecticut Office of Policy and Management, in consultation with several other state agencies, to adopt building construction regulations for...

457

Development Requirements for Advanced Industrial Heat Pumps  

E-Print Network [OSTI]

DOE is attempting to advance the use of heat pumps to save energy in industrial processes. The approach has emphasized developing better heat pump technology and transferring that technology to the private sector. DOE requires that heat pump...

Chappell, R. N.; Priebe, S. J.; Bliem, C. J.; Mills, J. I.

458

NERSC/DOE BER Requirements Workshop Presentations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Christopher Kerr | Global Cloud Resolving Model May 7, 2009 | Author(s): David Randall | IO Requirements for a Global Cloud Resolving Model May 7, 2009 | Author(s): Bruce...

459

Microsoft Word - Net Requirements Transparency Process_09302014  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4 As part of its Net Requirements Transparency process, on July 31, 2014 BPA published the SliceBlock and Block customers' FY2013 and forecast FY2015 Total Retail Load (TRL) and...

460

Cook County- LEED Requirements for County Buildings  

Broader source: Energy.gov [DOE]

In 2002, Cook County enacted an ordinance requiring all new county buildings and all retrofitted county buildings to be built to LEED standards. Specifically, all newly constructed buildings and...

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Harris County- LEED Requirement for County Buildings  

Broader source: Energy.gov [DOE]

In 2009, the Harris County Commissioners Court approved a measure that requires all new county buildings to meet minimum LEED certification standards. Buildings do not have to register with the the...

462

Microsoft Word - Directives Requiring Additional Documentation...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Chg 2 Radiation Protection of the Public and the Environment 24 DOE O 5480.19, Chg 2 Conduct of Operations Requirements for DOE Facilities 25 DOE O 5480.20A, Chg 1 Personnel...

463

Energy Efficiency and Conservation Requirements for Utilities  

Broader source: Energy.gov [DOE]

In October 2008 Pennsylvania adopted Act 129, creating energy efficiency and conservation requirements for the states investor owned utilities with at least 100,000 customers. With this limitation...

464

San Bernardino County- Green Building Requirement  

Broader source: Energy.gov [DOE]

In August 2007, the San Bernardino County Board of Supervisors approved a policy requiring that all new county buildings and major renovations be built to LEED Silver standards. The decision was...

465

CERTIFICATION REQUIREMENTS IN THE CALIFORNIA ENERGY COMMISSION'S  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION CERTIFICATION REQUIREMENTS IN THE CALIFORNIA ENERGY COMMISSION'S APPLIANCE REGULATIONS: A Summary Guide, Including Forms for Manufacturers, Trade Associations, and Other ...............................................................................................................1 III. Where to Find the Energy Commission Appliance Efficiency Regulations .....2 IV. Where to Get

466

Requirements & Status for Volume Fuel Cell Manufacturing  

E-Print Network [OSTI]

Requirements & Status for Volume Fuel Cell Manufacturing DOE Hydrogen Program, Washington, DC July ­Eliminate components, parts and process steps ­Standardize core components across products ­Standardize non-core

467

Technical requirements specification for tank waste retrieval  

SciTech Connect (OSTI)

This document provides the technical requirements specification for the retrieval of waste from the underground storage tanks at the Hanford Site. All activities covered by this scope are conducted in support of the Tank Waste Remediation System (TWRS) mission.

Lamberd, D.L.

1996-09-26T23:59:59.000Z

468

Metals Production Requirements for Rapid Photovoltaics Deployment  

E-Print Network [OSTI]

If global photovoltaics (PV) deployment grows rapidly, the required input materials need to be supplied at an increasing rate. In this paper, we quantify the effect of PV deployment levels on the scale of metals production. For example, we find that if cadmium telluride {copper indium gallium diselenide} PV accounts for more than 3% {10%} of electricity generation by 2030, the required growth rates for the production of indium and tellurium would exceed historically-observed production growth rates for a large set of metals. In contrast, even if crystalline silicon PV supplies all electricity in 2030, the required silicon production growth rate would fall within the historical range. More generally, this paper highlights possible constraints to the rate of scaling up metals production for some PV technologies, and outlines an approach to assessing projected metals growth requirements against an ensemble of past growth rates from across the metals production sector. The framework developed in this paper may be...

Kavlak, Goksin; Jaffe, Robert L; Trancik, Jessika E

2015-01-01T23:59:59.000Z

469

Mathematics Required Courses Cr. Semester Gr.  

E-Print Network [OSTI]

Discrete Mathematics 3 Math 321 or Math 421 Applied Stat. Methods Stat. Theory I 3 Elective Course* Cr Student: ID# Catalog: Advisor Upper Division Courses* Required Courses Cr. Semester Gr. *20 cr

Delene, David J.

470

Cold vacuum drying facility design requirements  

SciTech Connect (OSTI)

This release of the Design Requirements Document is a complete restructuring and rewrite to the document previously prepared and released for project W-441 to record the design basis for the design of the Cold Vacuum Drying Facility.

Irwin, J.J.

1997-09-24T23:59:59.000Z

471

Smart Grid Information Security (IS) Functional Requirement  

E-Print Network [OSTI]

It is important to implement safe smart grid environment to enhance people's lives and livelihoods. This paper provides information on smart grid IS functional requirement by illustrating some discussion points to the sixteen identified requirements. This paper introduces the smart grid potential hazards that can be referred as a triggering factor to improve the system and security of the entire grid. The background of smart information infrastructure and the needs for smart grid IS is described with the adoption of hermeneutic circle as methodology. Grid information technology and security-s session discusses that grid provides the chance of a simple and transparent access to different information sources. In addition, the transformation between traditional versus smart grid networking trend and the IS importance on the communication field reflects the criticality of grid IS functional requirement identification is introduces. The smart grid IS functional requirements described in this paper are general and ...

Ling, Amy Poh Ai

2011-01-01T23:59:59.000Z

472

Tucson- Solar Design Requirement for Homes  

Broader source: Energy.gov [DOE]

Tucson adopted an ordinance in June 2008 that requires all new single-family homes and duplexes in Tucson to be "solar-ready." The ordinance was developed by a stakeholder group which included...

473

ICE Pulse Oximeter Smart Alarm App Requirements  

E-Print Network [OSTI]

ICE Pulse Oximeter Smart Alarm App Requirements 6 March 2012 Revision 0 for an Integrated Clinical Environment (ICE) pulse oximetry monitoring app that provides.2 References [Purpose: List all ICE standards, and other standards and references

Huth, Michael

474

Requirements and Submission Process for Qualified Software  

Broader source: Energy.gov [DOE]

This document provides a complete list of requirements and submission details to have software qualified for calculating energy and power cost savings for commercial building tax deductions under tax code Section 179D.

475

ALS Beamline Design Requirements - Revision 1  

E-Print Network [OSTI]

6. Equipment protection system (EPS) qualification, specificcompleted. Equipment Protection System (EPS) Qualification:Qualification: The beamline has been checked for compliance with all relevant mechanical requirements for personnel safety and equipment

Heimann, Phil

2010-01-01T23:59:59.000Z

476

Siting Requirements for Anaerobic Lagoons (Iowa)  

Broader source: Energy.gov [DOE]

This statute provides regulations for required distances between anaerobic lagoons and residences or public use areas. The separation distances may be waived or reduced with the agreement of the...

477

Functional requirements to shape generation in CAD  

E-Print Network [OSTI]

An outstanding issue in computer-aided design (CAD) is the creation of geometric shapes from the description of functional requirements (FRs). This thesis presents a method that can generate assembled shapes from the given ...

Chung, Jinpyung, 1967-

2003-01-01T23:59:59.000Z

478

Computer Requirement ALL STUDENTS IN THE SCHOOL OF ARCHITECTURE ARE REQUIRED TO PROVIDE THEIR OWN  

E-Print Network [OSTI]

Computer Requirement ALL STUDENTS IN THE SCHOOL OF ARCHITECTURE ARE REQUIRED TO PROVIDE THEIR OWN PERSONAL LAPTOP COMPUTER. · All ENTERING GRADUATE STUDENTS in the School of Architecture are required to bring a computer. · All SECOND-YEAR UNDERGRADUATE STUDENTS accepted into the School of Architecture

Maxwell, Bruce D.

479

Mining Test Cases To Improve Software Maintenance  

E-Print Network [OSTI]

Finding TestTracing Features to Test Cases . . . . . . . . . . . . . . .5.4.2 Finding Test Intents Using

Ziftci, Celal

480

Grand Gulf-prioritization of regulatory requirements  

SciTech Connect (OSTI)

As cost pressures mount, Grand Gulf nuclear station (GGNS) is relying increasingly on various prioritization approaches to implement, modify, eliminate, or defer regulatory requirements. Regulatory requirements can be prioritized through the use of three measures: (1) safety (or risk) significance; (2) cost; and (3) public policy (or political) significance. This paper summarizes GGNS' efforts to implement solutions to regulatory issues using these three prioritization schemes to preserve a balance between cost and safety benefit.

Meisner, M.J. (Entergy Operations Inc., Port Gibson, MS (United States))

1993-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "in-use test requirements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Hanford analytical services quality assurance requirements documents  

SciTech Connect (OSTI)

Hanford Analytical Services Quality Assurance Requirements Document (HASQARD) is issued by the Analytical Services, Program of the Waste Management Division, US Department of Energy (US DOE), Richland Operations Office (DOE-RL). The HASQARD establishes quality requirements in response to DOE Order 5700.6C (DOE 1991b). The HASQARD is designed to meet the needs of DOE-RL for maintaining a consistent level of quality for sampling and field and laboratory analytical services provided by contractor and commercial field and laboratory analytical operations. The HASQARD serves as the quality basis for all sampling and field/laboratory analytical services provided to DOE-RL through the Analytical Services Program of the Waste Management Division in support of Hanford Site environmental cleanup efforts. This includes work performed by contractor and commercial laboratories and covers radiological and nonradiological analyses. The HASQARD applies to field sampling, field analysis, and research and development activities that support work conducted under the Hanford Federal Facility Agreement and Consent Order Tri-Party Agreement and regulatory permit applications and applicable permit requirements described in subsections of this volume. The HASQARD applies to work done to support process chemistry analysis (e.g., ongoing site waste treatment and characterization operations) and research and development projects related to Hanford Site environmental cleanup activities. This ensures a uniform quality umbrella to analytical site activities predicated on the concepts contained in the HASQARD. Using HASQARD will ensure data of known quality and technical defensibility of the methods used to obtain that data. The HASQARD is made up of four volumes: Volume 1, Administrative Requirements; Volume 2, Sampling Technical Requirements; Volume 3, Field Analytical Technical Requirements; and Volume 4, Laboratory Technical Requirements. Volume 1 describes the administrative requirements applicable to each of the other three volumes and is intended to be used in conjunction with the technical volumes.

Hyatt, J.E.

1997-09-25T23:59:59.000Z

482

Time and Temperature Test Results for PFP Thermal Stabilization Furnaces  

SciTech Connect (OSTI)

The national standard for plutonium storage acceptability (standard DOE-STD-3013-99, generally known as ''the 3013 standard'') has been revised to clarify the requirement for processes that will produce acceptable storage materials. The 3013 standard (Reference 1) now states that ''Oxides shall be stabilized by heating the material in an oxidizing atmosphere to a Material Temperature of at least 950 C (1742 F) for not less than 2 hours.'' The process currently in use for producing stable oxides for storage at the Plutonium Finishing Plant (PFP) heats a furnace atmosphere to 1000 C and holds it there for 2 hours. The temperature of the material being stabilized is not measured directly during this process. The Plutonium Process Support Laboratories (PPSL) were requested to demonstrate that the process currently in use at PFP is an acceptable method of producing stable plutonium dioxide consistently. A spare furnace identical to the production furnaces was set up and tested under varying conditions with non-radioactive surrogate materials. Reference 2 was issued to guide the testing program. The process currently in use at the PFP for stabilizing plutonium-bearing powders was shown to heat all the material in the furnace to at least 950 C for at least 2 hours. The current process will work for (1) relatively pure plutonium dioxide, (2) dioxide powders mixed with up to 20 weight percent magnesium oxide, and (3) dioxide powders with up to 11 weight percent magnesium oxide and 20 weight percent magnesium nitrate hexahydrate. Time and temperature data were also consistent with a successful demonstration for a mixture containing 10 weight percent each of sodium and potassium chloride; however, the molten chloride salts destroyed the thermocouples in the powder and temperature data were unavailable for part of that run. These results assume that the current operating limits of no more than 2500 grams per furnace charge and a powder height of no more than 1.5 inches remain in effect, although deeper powder beds (up to 2 inches) also yielded temperatures of greater than 950 C for longer than 2 hours.

COMPTON, J.A.

2000-08-09T23:59:59.000Z

483

Hamiltonian gadgets with reduced resource requirements  

E-Print Network [OSTI]

Application of the adiabatic model of quantum computation requires efficient encoding of the solution to computational problems into the lowest eigenstate of a Hamiltonian that supports universal adiabatic quantum computation. Experimental systems are typically limited to restricted forms of 2-body interactions. Therefore, universal adiabatic quantum computation requires a method for approximating quantum many-body Hamiltonians up to arbitrary spectral error using at most 2-body interactions. Hamiltonian gadgets, introduced around a decade ago, offer the only current means to address this requirement. Although the applications of Hamiltonian gadgets have steadily grown since their introduction, little progress has been made in overcoming the limitations of the gadgets themselves. In this experimentally motivated theoretical study, we introduce several gadgets which require significantly more realistic control parameters than similar gadgets in the literature. We employ analytical techniques which result in a reduction of the resource scaling as a function of spectral error for the commonly used subdivision, 3- to 2-body and $k$-body gadgets. Accordingly, our improvements reduce the resource requirements of all proofs and experimental proposals making use of these common gadgets. Next, we numerically optimize these new gadgets to illustrate the tightness of our analytical bounds. Finally, we introduce a new gadget that simulates a $YY$ interaction term using Hamiltonians containing only $\\{X,Z,XX,ZZ\\}$ terms. Apart from possible implications in a theoretical context, this work could also be useful for a first experimental implementation of these key building blocks by requiring less control precision without introducing extra ancillary qubits.

Yudong Cao; Ryan Babbush; Jacob Biamonte; Sabre Kais

2015-01-20T23:59:59.000Z

484

RF test bench automation Description  

E-Print Network [OSTI]

RF test bench automation Description: Callisto would like to implement automated RF test bench. Three RF test benches have to be studied and automated: LNA noise temperature test bench LNA gain phase of the test benches and an implementation of the automation phase. Tasks: Noise temperature

Dobigeon, Nicolas

485

ONTOLOGY OF TEST Larisa Soldatova  

E-Print Network [OSTI]

ONTOLOGY OF TEST Larisa Soldatova Post doctoral researcher Riichiro Mizoguchi Professor ISIR, Osaka In the present paper design of test generation systems (TGS) based on test ontology and student's knowledge model parts: domain independent- and domain-dependant knowledge. Suggested test ontology allows analyzing test

Mizoguchi, Riichiro

486

Texas A&M University Counseling and Testing Center data processing system  

E-Print Network [OSTI]

University Counseling and Testing Center. The system does not attempt to be the solution to the general question of reporting test results. The ma)ority of the techniques and procedures designed to solve the Counseling and Testing Center's specific... applicable to policies, procedures, and techniques that appear to be the most effective in specific circumstances. & 3 Fundamental Research in Administration, p. 41. The Counseling and Testing Center is required to report test results and to prepare...

Burwell, Edward Marshall

1964-01-01T23:59:59.000Z

487

Advanced Vehicle Testing Activity (AVTA) - Vehicle Testing and...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Advanced Vehicle Testing Activity (AVTA) Non-PHEV Evaluations and Data Collection AVTA HEV, NEV, BEV and HICEV Demonstrations and Testing Benchmarking of Advanced HEVs and...

488

Test Facility Daniil Stolyarov, Accelerator Test Facility User...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Development of the Solid-State Laser System for the Accelerator Test Facility Daniil Stolyarov, Accelerator Test Facility User's Meeting April 3, 2009 Outline Motivation for...

489

Micromachine friction test apparatus  

DOE Patents [OSTI]

A microelectromechanical (MEM) friction test apparatus is disclosed for determining static or dynamic friction in MEM devices. The friction test apparatus, formed by surface micromachining, is based on a friction pad supported at one end of a cantilevered beam, with the friction pad overlying a contact pad formed on the substrate. A first electrostatic actuator can be used to bring a lower surface of the friction pad into contact with an upper surface of the contact pad with a controlled and adjustable force of contact. A second electrostatic actuator can then be used to bend the cantilevered beam, thereby shortening its length and generating a relative motion between the two contacting surfaces. The displacement of the cantilevered beam can be measured optically and used to determine the static or dynamic friction, including frictional losses and the coefficient of friction between the surfaces. The test apparatus can also be used to assess the reliability of rubbing surfaces in MEM devices by producing and measuring wear of those surfaces. Finally, the friction test apparatus, which is small in size, can be used as an in situ process quality tool for improving the fabrication of MEM devices.

deBoer, Maarten P. (Albuquerque, NM); Redmond, James M. (Albuquerque, NM); Michalske, Terry A. (Cedar Crest, NM)

2002-01-01T23:59:59.000Z

490

Solutions to Test 3  

E-Print Network [OSTI]

April 5, 2014. Math 373. Test 3. Fall 2013. November 7, 2013. 1. You are given the following spot interest rate curve: Time t. Spot Rate tr. 0.5. 3.2%. 1.0. 3.5%. 1.5.

jeffb_000

2014-04-05T23:59:59.000Z

491

Audiometry (hearing test)  

Broader source: Energy.gov [DOE]

The audiogram is an evaluation of how well an individual can hear. Sounds are presented to the individual through earphones during the test. These sounds are presented at different levels of frequency and intensity. The human ear responds to the frequency or pitch of a sound and the intensity or loudness of the sound.

492

Alfalfa Seed Testing.  

E-Print Network [OSTI]

Texas Agricultural Experiment Stations -- - - -- - - - -- - -- Bulletin - No. 81 BOTANICAL SECTION. DECEMBER, 1905. Alfalfa Seed Testing By 0. M. BALL. Postoff ice: College Station, Brazos County, Texas. TEXAS AGRICULTURAL EXPERIMENT... ...................................... 4 Goocl Alfalfa Seed ...................................... 4 Method of Examining for Purity ........................ 6 Weed Seeds Often Found in Alfalfa ...................... 6 Russian Thistles .................................. 7 Ribdrass...

Ball, O. M. (Oscar Melville)

1905-01-01T23:59:59.000Z

493

Soil Remediation Test  

SciTech Connect (OSTI)

Soils contaminated with petroleum by-products can now be effectively remediated using a variety of technologies. Among these are in-situ bioremediation, land farming, and landfill/replacing of soil. The range of efficiencies and cost effectiveness of these technologies has been well documented. Exsorbet Plus is showing promise as an in-situ bioremediation agent. It is made of naturally grown Spaghnum Peat Moss which has been activated for encapsulation and blended with nitrogen-rich fertilizer. In its initial field test in Caracas, Venezuela, it was able to remediate crude oil-contaminated soil in 90 days at less than half of the cost of competing technologies. Waste Solutions, Corp and the US Department of Energy signed a Cooperative Research and Development Agreement to test Exsorbet Plus at the Rocky Mountain Oilfield Testing Center near Casper, Wyoming. As part of the test, soil contaminated with crude oil was treated with Exsorbet Plus to aid the in-situ bioremediation process. Quantitative total petroleum hydrocarbon (TPH) measurements were acquired comparing the performance of Exsorbet Plus with an adjacent plot undergoing unaided in-situ bioremediation.

Manlapig, D. M.; Williamsws

2002-04-01T23:59:59.000Z

494

Large Scale Computing and Storage Requirements for Nuclear Physics  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Science at NERSC HPC Requirements Reviews Requirements for Science: Target 2014 Nuclear Physics (NP) Large Scale Computing and Storage Requirements for Nuclear Physics:...

495

DOE CYBER SECURITY EBK: CORE COMPETENCY TRAINING REQUIREMENTS...  

Broader source: Energy.gov (indexed) [DOE]

CORE COMPETENCY TRAINING REQUIREMENTS: CA DOE CYBER SECURITY EBK: CORE COMPETENCY TRAINING REQUIREMENTS: CA DOE CYBER SECURITY EBK: CORE COMPETENCY TRAINING REQUIREMENTS. Key Cyber...

496

SEMI-ANNUAL REPORTING REQUIREMENTS (LNG EXPORTERS) | Department...  

Broader source: Energy.gov (indexed) [DOE]

SEMI-ANNUAL REPORTING REQUIREMENTS (LNG EXPORTERS) SEMI-ANNUAL REPORTING REQUIREMENTS (LNG EXPORTERS) Companies with authorizations to export LNG are required to file, on a...

497

Evaporative oxidation treatability test report  

SciTech Connect (OSTI)

In 1992, Congress passed the Federal Facilities Compliance Act that requires the U.S. Department of Energy (DOE) to treat and dispose of its mixed waste in accordance with the Resource Conservation and Recovery Act (RCRA) land disposal restrictions (LDRs). In response to the need for mixed-waste treatment capacity where available off-site commercial treatment facilities do not exist or cannot be used, the DOE Albuquerque Operations Office (DOE-AL) organized a Treatment Selection Team to match mixed wastes with treatment options and develop a strategy for treatment of its mixed wastes. DOE-AL manages operations at nine sites with mixed-waste inventories. The Treatment Selection Team determined a need to develop mobile treatment capacity to treat wastes at the sites where the wastes are generated. Treatment processes used for mixed waste not only must address the hazardous component (i.e., meet LDRs) but also must contain the radioactive component in a form that allows final disposal while protecting workers, the public, and the environment. On the basis of recommendations of the Treatment Selection Team, DOE-AL assigned projects to the sites to bring mixed-waste treatment capacity on-line. The three technologies assigned to the DOE Grand Junction Projects Office (GJPO) are evaporative oxidation, thermal desorption, and treated wastewater evaporation. Rust Geotech, the DOE-GJPO prime contractor, was assigned to design and fabricate mobile treatment units (MTUs) for these three technologies and to deliver the MTUs to selected DOE-AL sites. To conduct treatability tests at the GJPO, Rust leased a pilot-scale evaporative oxidation unit from the Clemson Technical Center (CTC), Anderson, South Carolina. The purpose of this report is to document the findings and results of tests performed using this equipment.

NONE

1995-04-01T23:59:59.000Z

498

EVALUATION OF REQUIREMENTS FOR THE DWPF HIGHER CAPACITY CANISTER  

SciTech Connect (OSTI)

The Defense Waste Processing Facility (DWPF) is considering the option to increase canister glass capacity by reducing the wall thickness of the current production canister. This design has been designated as the DWPF Higher Capacity Canister (HCC). A significant decrease in the number of canisters processed during the life of the facility would be achieved if the HCC were implemented leading to a reduced overall reduction in life cycle costs. Prior to implementation of the change, Savannah River National Laboratory (SRNL) was requested to conduct an evaluation of the potential impacts. The specific areas of interest included loading and deformation of the canister during the filling process. Additionally, the effect of the reduced wall thickness on corrosion and material compatibility needed to be addressed. Finally the integrity of the canister during decontamination and other handling steps needed to be determined. The initial request regarding canister fabrication was later addressed in an alternate study. A preliminary review of canister requirements and previous testing was conducted prior to determining the testing approach. Thermal and stress models were developed to predict the forces on the canister during the pouring and cooling process. The thermal model shows the HCC increasing and decreasing in temperature at a slightly faster rate than the original. The HCC is shown to have a 3F ?T between the internal and outer surfaces versus a 5F ?T for the original design. The stress model indicates strain values ranging from 1.9% to 2.9% for the standard canister and 2.5% to 3.1% for the HCC. These values are dependent on the glass level relative to the thickness transition between the top head and the canister wall. This information, along with field readings, was used to set up environmental test conditions for corrosion studies. Small 304-L canisters were filled with glass and subjected to accelerated environmental testing for 3 months. No evidence of stress corrosion cracking was indicated on either the canisters or U-bend coupons. Calculations and finite element modeling were used to determine forces over a range of handling conditions along with possible forces during decontamination. While expected reductions in some physical characteristics were found in the HCC, none were found to be significant when compared to the required values necessary to perform its intended function. Based on this study and a review of successful testing of thinner canisters at West Valley Demonstration Project (WVDP), the mechanical properties obtained with the thinner wall do not significantly undermine the ability of the canister to perform its intended function.

Miller, D.; Estochen, E.; Jordan, J.; Kesterson, M.; Mckeel, C.

2014-08-05T23:59:59.000Z

499

Transition-fault test generation  

E-Print Network [OSTI]

. One way to detect these timing defects is to apply test patterns to the integrated circuit that are generated using the transition-fault model. Unfortunately, industry's current transition-fault test generation schemes produce test sets that are too...

Cobb, Bradley Douglas

2013-02-22T23:59:59.000Z

500

GAP TESTS; COMPARISON BETWEEN UN GAP TEST AND CARD GAP TEST  

E-Print Network [OSTI]

98-36 GAP TESTS; COMPARISON BETWEEN UN GAP TEST AND CARD GAP TEST by R. BRANKA and C. MICHOT, FRANCE (tel.: 33 3 44 55 65 19, fax: 33 3 44 55 65 10) ABSTRACT: UN gap test, type 1(a) or 2(a), is the recommended test in the acceptance procedure for transport of explosives in class 1. Up to the revision

Paris-Sud XI, Université de