National Library of Energy BETA

Sample records for implementing procedures final

  1. DOE NEPA Implementing Procedures: Final Rule (57 Fed Reg 15122)

    Broader source: Energy.gov [DOE]

    DOE revised the existing rule at 10 CFR part 1021, titled "Compliance with the National Environmental Policy Act," to incorporate revised provision of DOE's Guidelines for Implementing the Procedural Provisions of the National Environmental Policy Act (NEPA).

  2. DOE NEPA Implementing Procedures: Final Rule (61 Fed Reg 64603)

    Broader source: Energy.gov [DOE]

    DOE amended its regulations governing compliance with the National Environmental Policy Act (NEPA). These amendments incorporate changes primarily related to DOE’s power marketing activities, based on DOE’s experience in applying the current NEPA regulations. The revised regulations are intended to improve DOE’s efficiency in implementing NEPA requirements by reducing costs and preparation time, while maintaining quality, consistent with the DOE Secretarial Policy Statement on NEPA issued in June 1994.

  3. DOE NEPA Implementing Procedures: Final Rule (61 Fed Reg 36222)

    Broader source: Energy.gov [DOE]

    DOE amended its existing regulations governing compliance with the National Environmental Policy Act (NEPA). The amendments incorporate changes that improve DOE’s efficiency in implementing NEPA requirements by reducing costs and preparation time while maintaining quality, consistent with the DOE Secretarial Policy Statement on NEPA issued in June 1994. These amendments also incorporate changes necessary to conform to recent changes in DOE’s missions, programs, and policies that have evolved in response to changing national priorities since the current regulations were issued in 1992.

  4. Blackout Final Implementation Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Report on the Implementation of the Task Force Recommendations U.S.-Canada Power System Outage Task Force Natural Resources Canada U.S. Department of Energy September 2006 Final Report on the Implementation of the Task Force Recommendations U.S.-Canada Power System Outage Task Force September 2006 Natural Resources Canada U.S. Department of Energy Acknowledgments This document was prepared by staff of Natural Resources Canada and the U.S. Department of Energy. The principal contributors

  5. Cooperating Agencies in Implementing the Procedural Requirements...

    Energy Savers [EERE]

    Agencies in Implementing the Procedural Requirements of the National Environmental Policy Act Cooperating Agencies in Implementing the Procedural Requirements of the National...

  6. Regulations for Implementing the Procedural Provisions of NEPA...

    Energy Savers [EERE]

    Regulations for Implementing the Procedural Provisions of NEPA Regulations for Implementing the Procedural Provisions of NEPA PDF icon CEQ Regulations for Implementing the...

  7. 10 CFR 1021: National Environmental Policy Act Implementing Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    10 CFR 1021: National Environmental Policy Act Implementing Procedures (DOE, 2011) 10 CFR 1021: National Environmental Policy Act Implementing Procedures (DOE, 2011) The purpose of ...

  8. NEPA Implementation Procedures: Appendices I, II, and III | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Implementation Procedures: Appendices I, II, and III NEPA Implementation Procedures: ... agency compliance with the National Environmental Policy Act and the CEQ's regulations. ...

  9. Blackout 2003: Blackout Final Implementation Report | Department...

    Energy Savers [EERE]

    Blackout Risk D:0myfilesBlackout ProgressBlackout-Progress.vp U.S. - Canada Power System Outage Task Force: Final Report on the Implementation of Task Force Recommendations

  10. Energy Conservation Program: Final Rule; Test Procedures for...

    Office of Environmental Management (EM)

    Final Rule; Test Procedures for Ceiling Fans Energy Conservation Program: Final Rule; Test Procedures for Ceiling Fans Ceiling Fans TP FinalRule (601.19 KB) More Documents & ...

  11. Handbook on procedures for implementing the National Environmental Policy Act

    SciTech Connect (OSTI)

    Orellana, A.M.

    1981-01-01

    This handbook establishes and presents for the Office of Surface Mining Reclamation and Enforcement (OSM) a comprehensive, logical set of procedures for implemeting the National Environmental Policy Act of 1969 (NEPA). (a) the legal framework with which OSM must comply is detailed in title I of NEPA, as amended. This handbook discusses responsibilities under title I and the following additional requirements resulting from NEPA; Section 2 of Executive Order 11514, Protection and Enhancement of Environmental Quality, as amended by Executive Order 11991; The regulations of the Council on Environmental Quality (CEQ) for implementing the procedural provisions of NEPA (40 CFR 1500-1508); The final procedures of the Department of the Interior (DOI) implementing NEPA (516 DM 1-7); and OSM's draft appendix to the above DOI procedures. (b) OSM is responsible for the implementation of the Surface Mining Control and Reclamation Act of 1977 (SMCRA), (30 U.S.C. 1201 et seq.). SMCRA has specific environmental protection performance standards designed to protect society and the environment from the adverse effects of surface coal mining operations and to reclaim mined areas left without adequate reclamation within these standards. As a Federal agency making decisions that affect the human environment, OSM must comply with NEPA.

  12. Final Report Implementing Office of Management and Budget Information...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Report Implementing Office of Management and Budget Information Dissemination Quality Guidelines (DOE, 2002) Final Report Implementing Office of Management and Budget ...

  13. Test Procedures for Integrated Light-Emitting Diode Lamps; Final...

    Broader source: Energy.gov (indexed) [DOE]

    Test Procedures for Integrated Light-Emitting Diode Lamps - Final Rule (532.58 KB) More Documents & Publications ISSUANCE 2015-06-25: Energy Conservation Program: Test Procedures ...

  14. DOE Publishes Final Rule for Television Test Procedure | Department...

    Broader source: Energy.gov (indexed) [DOE]

    DOE Publishes Final Rule for Plumbing Products Test Procedures DOE Publishes Notice of Proposed Rulemaking Regarding the Compliance Date for the Dehumidifier Test Procedure...

  15. DOE Issues Test Procedure Final Rule & Publishes Energy Conservation...

    Broader source: Energy.gov (indexed) [DOE]

    issued a pre-publication Federal Register final rule regarding test procedures for electric motors. For more information, please visit the rulemaking page. Test Procedure: All...

  16. 10 CFR 1021: National Environmental Policy Act Implementing Procedures

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (DOE, 2011) | Department of Energy 10 CFR 1021: National Environmental Policy Act Implementing Procedures (DOE, 2011) 10 CFR 1021: National Environmental Policy Act Implementing Procedures (DOE, 2011) The purpose of Part 10 CFR 1021 is to establish procedures that the Department of Energy (DOE) shall use to comply with section 102(2) of the National Environmental Policy Act (NEPA) of 1969 (42 U.S.C. 4332(2)) and the Council on Environmental Quality (CEQ) regulations for implementing the

  17. Title 32 CFR 775 Procedures for Implementing the National Environmenta...

    Open Energy Info (EERE)

    775 Procedures for Implementing the National Environmental Policy Act Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal...

  18. DOE Issues Final Appliance Test Procedure Rule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appliance Test Procedure Rule DOE Issues Final Appliance Test Procedure Rule December 8, 2006 - 9:46am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced a final rule establishing new test procedures and related definitions to determine the energy efficiency of certain residential appliances and commercial equipment. The rulemaking clarifies and codifies the test procedures mandated by the Energy Policy Act (EPAct) of 2005. "These new test procedures are the

  19. Energy Conservation Program: Final Rule; Test Procedures for Ceiling Fans |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Final Rule; Test Procedures for Ceiling Fans Energy Conservation Program: Final Rule; Test Procedures for Ceiling Fans Ceiling Fans TP Final_Rule (601.19 KB) More Documents & Publications Energy Conservation Program: Energy Conservation Standards

  20. DOE Publishes Final Rule for Residential Furnace Fan Test Procedure |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Publishes Final Rule for Residential Furnace Fan Test Procedure DOE Publishes Final Rule for Residential Furnace Fan Test Procedure January 3, 2014 - 12:00am Addthis The Department of Energy (DOE) has published a final rule regarding test procedures for residential furnace fans. 79 FR 500 (January 3, 2014). Find more information on the rulemaking, including milestones, statutory authority, rulemaking documents, and any other related rulemakings. All notices, public

  1. DOE Publishes Final Rule for Residential Furnace Fan Test Procedure...

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy (DOE) has published a final rule regarding test procedures for ... EERE-2010-BT-TP-0010. Find product information about current standards and test ...

  2. DOE Publishes Final Rule for Plumbing Products Test Procedures

    Broader source: Energy.gov [DOE]

    The Department of Energy has published a final rule regarding test procedures for showerheads, faucets, water closets, urinals, and commercial prerinse spray valves.

  3. Reference Manual and Procedures for Implementation of PURPA Standards...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPACT 2005 (March 2006) Reference Manual and Procedures for Implementation of PURPA Standards in EPACT 2005 (March 2006) This reference manual is intended to be used as an aid to state ...

  4. Technical Support Document for the National Environmental Policy Act Implementing Procedures

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technical Support Document Supporting Information for DOE Final Rulemaking, 10 CFR part 1021 Page 1 Department of Energy Technical Support Document for the National Environmental Policy Act Implementing Procedures Final Rule September 27, 2011 This Technical Support Document and the preambles to the Department of Energy"s (DOE"s) Notice of Proposed Rulemaking (76 FR 214) and final rule provide the supporting basis for the changes being made to DOE"s National Environmental Policy

  5. Heat Treatment Procedure Qualification -- Final Technical Report

    SciTech Connect (OSTI)

    Robert C. Voigt

    2004-10-15

    Heat treatment practices used by steel foundries have been carefully studied as part of comprehensive heat treatment procedure development trials. These studies highlight the relationships between critical heat treatment process control parameters and heat treatment success. Foundry heat treatment trials to develop heat treatment procedure qualification have shed light on the relationship between heat treatment theory and current practices. Furnace load time-temperature profiles in steel foundries exhibit significant differences depending on heat treatment equipment, furnace loading practice, and furnace maintenance. Time-temperature profiles of the furnace control thermocouples can be very different from the time-temperature profiles observed at the center of casting loads in the furnace. Typical austenitrization temperatures and holding times used by steel foundries far exceed what is required for transformation to austenite. Quenching and hardenability concepts were also investigated. Heat treatment procedure qualification (HTPQ) schema to demonstrate heat treatment success and to pre-qualify other alloys and section sizes requiring lesser hardenability have been developed. Tempering success is dependent on both tempering time and temperature. As such, furnace temperature uniformity and control of furnace loading during tempering is critical to obtain the desired mechanical properties. The ramp-up time in the furnace prior to the establishment of steady state heat treatment conditions contributes to the extent of heat treatment performed. This influence of ramp-up to temperature during tempering has been quantified.

  6. Sustained utility implementation of photovoltaics. Final report

    SciTech Connect (OSTI)

    Osborn, D.E.

    1998-05-01

    SMUD is a leader in utility grid-connected applications of PVs with the world`s largest distributed PV power system. SMUD is continuing its ambitious sustained, orderly development (SOD) commercialization effort of the grid-connected, utility PV market. This program is aimed at developing the experience needed to successfully integrate PV as distributed generation into the utility system, develop market and long-term business strategies and to stimulate the collaborative processes needed to accelerate the cost-reductions necessary for PV to be cost-competitive in these applications by about the year 2002. This report documents the progress made in the 1994/1995 SMUD PV Program under this contract and the PV projects partially supported by this contract. This contract has been considered a Pre-cursor to the TEAM-UP program implemented the following year.

  7. Reference Manual and Procedures for Implementation of PURPA Standards in

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPACT 2005 (March 2006) | Department of Energy EPACT 2005 (March 2006) Reference Manual and Procedures for Implementation of PURPA Standards in EPACT 2005 (March 2006) This reference manual is intended to be used as an aid to state commissions and utilities as they consider the new federal standards that are part of the Energy Policy Act of 2005 (Subtitle E, "Amendments to PURPA," sections 1251, 1252, and 1254). It summarizes state commission and unregulated utility requirements

  8. 2015-12-30 Energy Conservation Program: Test Procedure for Pumps Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Test Procedure for Pumps Final Rule 2015-12-30 Energy Conservation Program: Test Procedure for Pumps Final Rule Test Procedure for Pumps Final Rule Pumps Test Procedure Final Rule.pdf (1.85 MB) More Documents & Publications Energy Conservation Program: Test Procedure for Pumps, Notice of Proposed Rulemaking Draft PEI Calculator Energy Conservation Program: Energy Conservation Standards for Pump, Notice of Proposed Rulemaking

  9. ISSUANCE 2015-12-11: Final Rule Regarding Test Procedures for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment ISSUANCE 2015-12-11: Final Rule Regarding Test Procedures for ...

  10. 40 CFR 1500-1508: CEQ Regulations for Implementing the Procedural

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Provisions of NEPA | Department of Energy 40 CFR 1500-1508: CEQ Regulations for Implementing the Procedural Provisions of NEPA 40 CFR 1500-1508: CEQ Regulations for Implementing the Procedural Provisions of NEPA CEQ Regulations for Implementing the Procedural Provisions of NEPA (40 CFR 1500-1508) (153.66 KB) More Documents & Publications Effective Public Participation (DOE, 1998) Forty Most Asked Questions Concerning CEQ's National Environmental Policy Act Regulations (CEQ, 1986) A

  11. CEQ Regulations for Implementing the Procedural Provisions of...

    Energy Savers [EERE]

    1501.4 Whether to prepare an environmental impact statement. 1501.5 Lead agencies. 1501.6 ... Sec. 1505.1 Agency decisionmaking procedures. 1505.2 Record of decision in cases ...

  12. ISSUANCE 2015-07-15: Energy Conservation Program: Test Procedure for Refrigerated Bottled or Canned Beverage Vending Machines, Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedure for Refrigerated Bottled or Canned Beverage Vending Machines, Final Rule

  13. ISSUANCE 2016-03-24: Energy Conservation Program: Clarification of Test Procedures for Fluorescent Lamps Ballasts, Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Clarification of Test Procedures for Fluorescent Lamps Ballasts, Final Rule

  14. USACE ER 200-2-2 Procedures for Implementing NEPA | Open Energy...

    Open Energy Info (EERE)

    ER 200-2-2 Procedures for Implementing NEPA Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: USACE ER 200-2-2...

  15. Formal guidance for the use of science in EIA: Analysis of agency procedures for implementing NEPA

    SciTech Connect (OSTI)

    Malik, M.; Bartlett, R.V. . Dept. of Political Science)

    1993-01-01

    The authors undertake here an analysis and evaluation of official department and agency procedures for implementing the National Environmental Policy Act (NEPA). They assess the extent to which these procedures provide implementing guidance, beyond that provided by the Council on Environmental Quality (CEQ) regulations themselves, for those provisions of NEPA and the regulations pertaining to scientific integrity, content, and methodology. They analyze and evaluate content using criteria explicit or implicit in NEPA and the regulations, finding that many federal agencies still require little attention to scientific precepts and methodology in the implementation of NEPA. The substantive guidance provided by agencies on conceptual and methodological questions is general and, with few exceptions, minimal.

  16. Implementation of Executive Order 12114 Environmental Effects Abroad of Major Federal Actions: Final Guideline (DOE, 1981)

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Department of Energy hereby adopts final Departmental guidelines implementing Executive Order 12114-Environmental Effecrs Abroad of Major Federal Actions, whic was issued on January 4, 1979.

  17. 2014-04-10 Issuance: Test Procedures for Refrigerators, Refrigerator-Freezers, and Freezers; Final Rule

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register final rule regarding test procedures for residential refrigerators and freezers, as issued by the Deputy Assistant Secretary for Energy Efficiency on April 10, 2014.

  18. DOE Issues Test Procedure Final Rule & Publishes Energy Conservation Standards NOPR for Electric Motors

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) has issued a pre-publication Federal Register final rule regarding test procedures and published a notice of proposed rulemaking (NOPR) regarding energy conservation standards for electric motors.

  19. Final Report Implementing Office of Management and Budget Information...

    Broader source: Energy.gov (indexed) [DOE]

    16, 2002 are posted on the Commission's web site, http: www.drbc.net, where they can ... ADDRESSES: The final DOE report and guidelines in this notice are available on the web ...

  20. DOE National Environmental Policy Act Implementing Procedures (10 CFR Part 1021) [DOE][2012]

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CFR PART 1021 - NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES DEPARTMENT OF ENERGY Authority: 42 U.S.C. 7101 et seq.; 42 U.S.C. 4321 et seq.; 50 U.S.C. 2401 et seq. Subpart A-General § 1021.100 Purpose. The purpose of this part is to establish procedures that the Department of Energy (DOE) shall use to comply with section 102(2) of the National Environmental Policy Act (NEPA) of 1969 (42 U.S.C. 4332(2)) and the Council on Environmental Quality (CEQ) regulations for implementing the

  1. Finally Underway: Implementation of the Port Hope Area Initiative - 13151

    SciTech Connect (OSTI)

    Fahey, Christine A.; Palmeter, Tim; Blanchette, Marcia

    2013-07-01

    Two distinct yet closely related waste remediation projects are finally underway in Canada under the Port Hope Area Initiative (PHAI) which aims to clean up 1.7 million cubic metres (m{sup 3}) of low-level radioactive waste (LLRW) arising from 60 years of uranium and radium operations. Under the PHAI, the Port Hope Project and the smaller Port Granby Project will result in the consolidation of the LLRW within two highly engineered, above-ground mounds, to be constructed within the municipalities of Port Hope and Clarington. These projects will fulfill the federal government commitment to the safe, long-term management of the LLRW, as set out in the legal agreement signed by the government and the host municipalities in 2001. The federal authorization to commence PHAI Remediation and Construction Phase 2 was received in late 2011 and several enabling infrastructure construction and radiological survey contracts were awarded in 2012. The contracts to remediate the waste sites and construct the new engineered mounds will be tendered in 2013. At the end of Phase 2, environmental risks will be substantially mitigated, land development restrictions lifted, and an honourable legacy left for future generations. (authors)

  2. Implementation of Distributed ADAMS Over Legion Using a Component DBMS Design. Final Report

    SciTech Connect (OSTI)

    Pfaltz, John L.; Orlandic, Ratko

    2002-11-26

    There were four primary research areas reported in the final report for the original funding period They are: implementation of high dimensional data spaces; knowledge discovery in scientific databases; and mismatch between implementing components; demonstrate the utility of ADAMS in a specific domain science.

  3. 2015-01-28 Issuance: Test Procedure for Fluorescent Lamp Ballasts; Final Rule Correction

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register final rule correction regarding test procedures for fluorescent lamp ballasts, as issued by the Deputy Assistant Secretary for Energy Efficiency on January 28, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  4. 2014-11-24 Issuance: Test Procedures for Commercial Clothes Washers; Final Rule

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register Final Rule regarding test procedures for commercial clothes washers, as issued by the Deputy Assistant Secretary for Energy Efficiency on November 24, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  5. System Configuration Management Implementation Procedure for the Canister Storage Building (CSB)

    SciTech Connect (OSTI)

    GARRISON, R.C.

    2000-09-22

    This document implements the procedure for providing configuration control for the monitoring and control systems associated with the operation of the Canister Storage Building (CSB). It identifies and defines the configuration items in the monitoring and control systems, provides configuration control of these items throughout the system life cycle, provides configuration status accounting, physical protection and control, and verifies the completeness and correctness of the items. It is written to comply with HNF-SD-SNF-CM-001, Spent Nuclear Fuel Configuration Management Plan (Forehand 1998), HNF-PRO-309, Computer Software Quality Assurance Requirements, HNF-PRO-2778, IRM Application Software System Life Cycle Standards, and applicable sections of administrative procedure AP-CM-6-037-00, SNF Project Process Automation Software and Equipment Configuration Management.

  6. Final Report Implementing Office of Management and Budget Information Dissemination Quality Guidelines (DOE, 2002)

    Broader source: Energy.gov [DOE]

    This DOE guidelines sets forth policy and procedures to ensure and maximize the quality, utility, objectivity, and integrity of the information that DOE disseminates to members of the public. DOE has prepared this final report pursuant to OMB government-wide guidelines under section 515 of the Treasury and General Government Appropriations Act for Fiscal Year 2001.

  7. Microsoft Word - PSRP May 15 2009 _WAPA Implementation Approp_ Final.docx

    Broader source: Energy.gov (indexed) [DOE]

    Implementation Approp) Final.docx PSRP Name: WAPA Recovery Act Implementation Appropriation PSRP Lead Program Office and/or Laboratory/Site Office: Western Area Power Administration PSRP Lead Manager: Tim Meeks phone: (720) 962-7077 e-mail: tmeeks@wapa.gov address: P.O. Box 281213 Lakewood, CO 80228-8213 Does this program align with an existing PART program? No Does this program align with an existing CFDA program? No Program Title WAPA Recovery Act Implementation Appropriation 1. Objectives:

  8. Procedures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procedures A NSSAB outreach display is available for community events The Nevada Site Specific Advisory Board (NSSAB) abides by a variety of federal and self-imposed procedures. For more information on these procedures please click on the items below: Federal Advisory Committee Act Nevada Site Specific Advisory Board Standard Operating Procedures Advisory Committee Management Program Manual National Charter EM Site Specific Advisory Board Policies and Procedures Desk Reference Send mail to

  9. 2014-06-27 Issuance: Test Procedures for Residential and Commercial Water Heaters; Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document is a pre-publication Federal Register final rule regarding test procedures for residential and commercial water heaters, as issued by the Deputy Assistant Secretary for Energy Efficiency on June 27, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  10. ISSUANCE 2015-06-08: Energy Conservation Program: Test Procedures for Packaged Terminal Air Conditioners and Packaged Terminal Heat Pumps, Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Packaged Terminal Air Conditioners and Packaged Terminal Heat Pumps, Final Rule

  11. ISSUANCE 2014-12-23: Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment and Pool Heaters, Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment and Pool Heaters, Final Rule

  12. Grouting for vertical geothermal heat pump systems: Engineering design and field procedures manual. Final report

    SciTech Connect (OSTI)

    1997-12-01

    Grouting of the vertical ground heat exchanger is important for environmental and heat transfer reasons, and is generally accomplished by the placement of a low permeability material into the annular space between the borehole wall and the pipes suspended in the borehole. Backfilling is the practice of placing drill cuttings or other materials into the annular volume, with no specific effort directed toward creating a hydraulic seal. State and local regulations dictate the need for grouting versus backfilling. This manual concentrates on the technical aspects of grouting, including the environmental issues related to grouting, the thermal characteristics of different grouting materials and how the design must account for those, and the practical aspects of grouting for the field technician. Formation conditions are presented where grouting is necessary to assure the quality of the potable water source, while other conditions are cited where only portions of the borehole need to be grouted. Thermal properties of several grouting materials, both bentonite-based and cement-based, are provided as input data to the calculation of borehole thermal resistance. A procedure is provided for the designer of a vertical ground heat exchanger to calculate borehole thermal resistance, and techniques are described to utilize those values in commonly used commercial design software packages. Several sets of field verification data are presented which indicate that the borehole thermal resistance design data are relevant and important in the performance of the vertical u-bend heat exchanger. Finally, procedures are described for the field technician for mixing equipment, pump, and tremie pipe selection. Methods to estimate the volume of grout required for a job are provided. Recommended field procedures for tremie installation and the grouting process are also provided.

  13. 57 Fed Reg 15122: DOE NEPA Implementing Procedures-Final Rule

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) is revising the existing rule at 10 CFR part 1021, titled "Compliance with the National Environmental Policy Act," to incorporate revised provisions of DOE's...

  14. 2015-12-29 Consumer Furnaces and Boilers Test Procedures Final Rule

    Broader source: Energy.gov [DOE]

    Energy Conservation Program for Consumer Products: Test Procedures for Consumer Furnaces and Boilers

  15. Final Report---Next-Generation Solvers for Mixed-Integer Nonlinear Programs: Structure, Search, and Implementation

    SciTech Connect (OSTI)

    Linderoth, Jeff T.; Luedtke, James R.

    2013-05-30

    The mathematical modeling of systems often requires the use of both nonlinear and discrete components. Problems involving both discrete and nonlinear components are known as mixed-integer nonlinear programs (MINLPs) and are among the most challenging computational optimization problems. This research project added to the understanding of this area by making a number of fundamental advances. First, the work demonstrated many novel, strong, tractable relaxations designed to deal with non-convexities arising in mathematical formulation. Second, the research implemented the ideas in software that is available to the public. Finally, the work demonstrated the importance of these ideas on practical applications and disseminated the work through scholarly journals, survey publications, and conference presentations.

  16. ISSUANCE 2015-12-11: Final Rule Regarding Test Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment

    Office of Energy Efficiency and Renewable Energy (EERE)

    Final Rule Regarding Test Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment

  17. 10 CFR 1021: National Environmental Policy Act Implementing Procedures (DOE, 2011)

    Broader source: Energy.gov [DOE]

    The purpose of Part 10 CFR 1021 is to establish procedures that the Department of Energy (DOE) shall use to comply with section 102(2) of the National Environmental Policy Act (NEPA) of 1969 (42 U...

  18. Improved data and procedures needed for development and implementation of building energy performance standards

    SciTech Connect (OSTI)

    Staats, E.B.

    1980-12-23

    Energy conservation standards for new buildings being developed by the DOE are discussed. Specifically, it addresses: (1) what still needs to be done before sound standards can be issued, (2) the need to transfer implementation responsibility for the standards from the US HUD to the DOE, and (3) the inappropriateness of the proposed sanction for noncompliance in view of the large decrease in expected energy savings.

  19. System Configuration Management Implementation Procedure for the Canister Storage Building (CSB)

    SciTech Connect (OSTI)

    GARRISON, R.C.

    2000-11-28

    This document provides configuration management for the Distributed Control System (DCS), the Gaseous Effluent Monitoring System (GEMS-100) System, the Heating Ventilation and Air Conditioning (HVAC) Programmable Logic Controller (PLC), the Canister Receiving Crane (CRC) CRN-001 PLC, and both North and South vestibule door interlock system PLCs at the Canister Storage Building (CSB). This procedure identifies and defines software configuration items in the CSB control and monitoring systems, and defines configuration control throughout the system life cycle. Components of this control include: configuration status accounting; physical protection and control; and verification of the completeness and correctness of these items.

  20. Procedures and equipment for shortening refueling outages in Babcock and Wilcox PWRs. Final report

    SciTech Connect (OSTI)

    Baker, H.A.; Carr, C.W.

    1985-04-01

    New refueling equipment and procedures - plus a software package bid specification for outage management - can reduce refueling outages in Babcock and Wilcox PWRs. At Duke Power Company's Oconee nuclear station, a single modification in the fuel-handling system cut 5 days off the refueling schedule.

  1. Load research manual. Volume 2. Fundamentals of implementing load research procedures

    SciTech Connect (OSTI)

    Brandenburg, L.; Clarkson, G.; Grund, Jr., C.; Leo, J.; Asbury, J.; Brandon-Brown, F.; Derderian, H.; Mueller, R.; Swaroop, R.

    1980-11-01

    This three-volume manual presents technical guidelines for electric utility load research. Special attention is given to issues raised by the load data reporting requirements of the Public Utility Regulatory Policies Act of 1978 and to problems faced by smaller utilities that are initiating load research programs. In Volumes 1 and 2, procedures are suggested for determining data requirements for load research, establishing the size and customer composition of a load survey sample, selecting and using equipment to record customer electricity usage, processing data tapes from the recording equipment, and analyzing the data. Statistical techniques used in customer sampling are discussed in detail. The costs of load research also are estimated, and ongoing load research programs at three utilities are described. The manual includes guides to load research literature and glossaries of load research and statistical terms.

  2. Building Energy Simulation Test for Existing Homes (BESTEST-EX): Instructions for Implementing the Test Procedure, Calibration Test Reference Results, and Example Acceptance-Range Criteria

    SciTech Connect (OSTI)

    Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.; Kennedy, M.

    2011-08-01

    This publication summarizes building energy simulation test for existing homes (BESTEST-EX): instructions for implementing the test procedure, calibration tests reference results, and example acceptance-range criteria.

  3. 2014-07-10 Issuance: Test Procedures for Refrigerators, Refrigerator-Freezers, and Freezers; Final Rule Correction

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register final rule correction regarding test procedures for refrigerators, refrigerator-freezers, and freezers, as issued by the Deputy Assistant Secretary for Energy Efficiency on July 10, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  4. Microsoft Word - Final Agreement to Implement 6 30 08 clean draft.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Agreement to Implement - Page - 1 - AGREEMENT TO IMPLEMENT U.S. DISTRICT COURT ORDER DATED MAY 25, 2006 The Parties to this Agreement are the United States Department of Energy ("DOE"), the United States Navy, Naval Nuclear Propulsion Program ("Navy") 1 and the State of Idaho (by and through the Governor of the State of Idaho, C.L. "Butch" Otter, and the Idaho Attorney General, Lawrence G. Wasden) and the Governor of the State of Idaho, C.L. "Butch" Otter,

  5. Implementation of the Strategic Petroleum Reserve in the defense logistics agency. Final report

    SciTech Connect (OSTI)

    Holbrook, P.F.

    1981-07-01

    A brief synopsis of the impact of the 1973 Arab oil embargo on the economy and people of the United States is presented together with organizational problems that faced the Department of Energy in implementing the Strategic Petroleum Reserve. A review of the involvement of the Defense Logistics Agency in support of the reserve is presented from a budgetary and financial viewpoint.

  6. Base program interim phase test procedure - Coherent Laser Vision System (CLVS). Final report, September 27, 1994--January 30, 1997

    SciTech Connect (OSTI)

    1997-05-01

    The purpose of the CLVS research project is to develop a prototype fiber-optic based Coherent Laser Vision System suitable for DOE`s EM Robotics program. The system provides three-dimensional (3D) vision for monitoring situations in which it is necessary to update geometrics on the order of once per second. The CLVS project plan required implementation in two phases of the contract, a Base Contract and a continuance option. This is the Test Procedure and test/demonstration results presenting a proof-of-concept for a system providing three-dimensional (3D) vision with the performance capability required to update geometrics on the order of once per second.

  7. EIS-0295: Platte River Recovery Implementation Program Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    This PEIS evaluates impacts of alternative Recovery Implementation Programs to: (1) Secure defined benefits for the target species and their associated habitats to assist in their conservation and recovery through a basin-wide cooperative approach that can be agreed to by the three states and the Department of the Interior; (2) serve as the reasonable and prudent alternative to offset the effects of existing and new water related activities in the Platte River Basin that, in the absence of such a Program, would be found by the U.S. Department of Interior Fish and Wildlife Service to be likely to jeopardize the continued existence of the target species or adversely modify designated critical habitat; (3) help prevent the need to list more basin associated species pursuant to the Endangered Species Act; and (4) mitigate new water related activities in a state in a manner that will not increase the mitigation responsibilities of other signatory states.

  8. Demonstration and implementation of ethanol as an aviation fuel. Final report

    SciTech Connect (OSTI)

    1998-01-01

    The objectives of the program were to demonstrate the viability of ethanol as an aviation fuel at appropriate locations and audiences in the participating Biomass Energy Program Regions, and to promote implementation projects in the area. Seven demonstrations were to be performed during the Summer 1995 through December 1996 period. To maximize the cost effectiveness of the program, additional corporate co-sponsorships were sought at each demonstration site and the travel schedule was arranged to take advantage of appropriate events taking place in the vicinity of the schedule events or enroute. This way, the original funded amount was stretched to cover another year of activities increasing the number of demonstrations from seven to thirty-nine. While the Renewable Aviation Fuels Development Center (RAFDC) contract focused on ethanol as an aviation fuel, RAFDC also promoted the broader use of ethanol as a transportation fuel. The paper summarizes locations and occasions, and gives a brief description of each demonstration/exhibit/presentation held during the term of the project. Most of the demonstrations took place at regularly scheduled air shows, such as the Oshkosh, Wisconsin Air Show. The paper also reviews current and future activities in the areas of certification, emission testing, the international Clean Airports Program, air pollution monitoring with instrumented aircraft powered by renewable fuels, training operation and pilot project on ethanol, turbine fuel research, and educational programs.

  9. Blackout Final Implementation Report

    Energy Savers [EERE]

    ... and Northeast and in Ontario, and why the blackout was not contained; and ii) to recommend measures to reduce the risk of future power outages and the scope of any that do occur. ...

  10. ISSUANCE 2015-06-30: Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and Test Procedures for Commercial Heating, Air-Conditioning, and Water-Heating Equipment, Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and Test Procedures for Commercial Heating, Air-Conditioning, and Water-Heating Equipment, Final Rule

  11. Procedural guidance for reviewing exposure information under RCRA (Resource Conservation and Recovery Act) section 3019. Final report

    SciTech Connect (OSTI)

    Grogan, T.; Kayser, R.

    1986-09-26

    This guidance manual describes the procedures for permit writers in evaluating exposure information submitted under Resource Conservation and Recovery Act (RCRA) Section 3019. The integration of the review with existing RCRA permitting activities is also discussed. The document outlines procedures to follow in referring sites to the Agency for Toxic Substances and Disease Registry (ATSDR) for health evaluations.

  12. Ruminant methane reduction through livestock development in Tanzania. Final report for US Department of Energy and US Initiative on Joint Implementation--Activities Implemented Jointly

    SciTech Connect (OSTI)

    Livingston, Roderick

    1999-07-01

    This project was designed to help develop the US Initiative on Joint Implementation activities in Eastern Africa. It has been communicated in meetings with representatives from the Ministry of Environment of Tanzania and the consultant group that developed Tanzania's National Climate Change Action Plan, the Centre for Energy, Environment, Science and Technology, that this project fits very well with the developmental and environmental goals of the Government of Tanzania. The goal of the Activities Implemented Jointly ruminant livestock project is to reduce ruminant methane emissions in Eastern Africa. The project plans a sustainable cattle multiplication unit (CMU) at Mabuki Ranch in the Mwanza Region of Tanzania. This CMU will focus on raising genetically improved animals to be purchased by farmers, developmental organizations, and other CMUs in Tanzania. Through the purchase of these animals farmers will raise their income generation potential and reduce ruminant methane emissions.

  13. Emergency evacuation/transportation plan update: Traffic model development and evaluation of early closure procedures. Final report

    SciTech Connect (OSTI)

    1993-10-28

    Prolonged delays in traffic experienced by Laboratory personnel during a recent early dismissal in inclement weather, coupled with reconstruction efforts along NM 502 east of the White Rock Wye for the next 1 to 2 years, has prompted Los Alamos National Laboratory (LANL) to re-evaluate and improve the present transportation plan and its integration with contingency plans maintained in other organizations. Facilities planners and emergency operations staff need to evaluate the transportation system`s capability to inefficiently and safely evacuate LANL under different low-level emergency conditions. A variety of potential procedures governing the release of employees from the different technical areas (TAs) requires evaluation, perhaps with regard to multiple emergency-condition scenarios, with one or more optimal procedures ultimately presented for adoption by Lab Management. The work undertaken in this project will hopefully lay a foundation for an on-going, progressive transportation system analysis capability. It utilizes microscale simulation techniques to affirm, reassess and validate the Laboratory`s Early Dismissal/Closure/Delayed Opening Plan. The Laboratory is required by Federal guidelines, and compelled by prudent practice and conscientious regard for the welfare of employees and nearby residents, to maintain plans and operating procedures for evacuation if the need arises. The tools developed during this process can be used outside of contingency planning. It is anticipated that the traffic models developed will allow site planners to evaluate changes to the traffic network which could better serve the normal traffic levels. Changes in roadway configuration, control strategies (signalization and signing), response strategies to traffic accidents, and patterns of demand can be modelled using the analysis tools developed during this project. Such scenarios typically are important considerations in master planning and facilities programming.

  14. Design procedures for coal mine tunnels. Open file report 1 Oct 79-31 Dec 82 (final)

    SciTech Connect (OSTI)

    Bieniawski, Z.T.

    1983-03-31

    Although coal mine tunnels such as the main haulageways or roadways are the lifelines of coal mines, little attention has been paid to them in the United States in terms of preconstruction planning and design. This report summarizes the results of a 3-year research project aimed at improving the design procedures for coal mine tunnels. A new design approach was developed for this purpose and roof-support design charts were prepared for mine tunnels and their intersections. Analytical studies, 'base friction' model experiments, and in situ rock stress measurements were performed during this research.

  15. 2014-05-05 Issuance: Alternative Efficiency Determination Methods and Test Procedures for Walk-In Coolers and Walk-In Freezers; Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document is a pre-publication Federal Register final rule regarding alternative efficiency determination methods and test procedures for walk-in coolers and walk-in freezers, as issued by the Deputy Assistant Secretary for Energy Efficiency on May 5, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  16. Implementation document for northwest boundary system, long-term improvements, interim response action. Volume 1. General. Final report

    SciTech Connect (OSTI)

    1992-01-01

    This IRA is being conducted as part of the IRA process for the RMA. The Long-Term Improvements IRA consist of completion of the short-term improvements IRA and implementation of monitoring program for the entire Northwest Boundary System, with no modification to the existing treatment plant. The implementation of the NWB system long-term improvements IRA is intended to provide monitoring data, construction of additional monitoring wells (including revegetation of areas disturbed during construction), monitoring both treatment plant and aquifer water quality, water-table monitoring, and preparation of a report containing an evaluation of system performance based on quarterly monitoring L-R one year.

  17. Energy-conservation-investment decision making in developing countries: A review of project implementation in industry. Final report

    SciTech Connect (OSTI)

    Not Available

    1989-12-01

    Despite recent efforts in a number of developing countries to promote energy conservation (EC) and efficiency, only a fraction of EC potential has been captured, especially for projects that require significant investments. The document analyzes EC efforts in 11 countries where energy audit and/or feasibility study programs have been carried out (Bangladesh, Costa Rica, Ecuador, El Salvador, Guatemala, Honduras, Jordan, Pakistan, Panama, the Philippines, and Sri Lanka), covering some 1,500 EC projects involving 242 industrial companies. Cost and length of payback seem to be the determining factors for companies considering EC measures; no-cost or low-cost projects with paybacks of less than a year (such as power factor improvement projects) had the highest rate of implementation, while expensive, complicated projects (e.g., cogeneration or fuel substitution projects) were most often rejected. The document concludes, however, that the rate of implementation of EC programs has been quite high, and recommends that inexpensive, short-term projects be featured in future EC programs and increased levels of TA and financial assistance be made available to companies implementing long-term EC measures.

  18. Otec power plant for the Marshall Islands. Feasibility study phase 2. Project implementation. Final report. Export trade information

    SciTech Connect (OSTI)

    1996-03-25

    This report presents the results of phase 2 of a study which was conducted to assess the economic and design feasibility of a 5-10 MW OTEC power plant to be installed at Majuro, Marshall Islands. The document is divided into (1) Introduction; (2) Executive Summary; (3) Study Highlights, Conclusions, and Recommendations; (4) Phase 2 - Project Implementation Goals; (5) Study Task 1.0 - Project Planning; (6) Study Task 2.0 - Conceptual Design/Risk Reduction; (7) Preliminary Oceanographic and Site Survey; (8) List of References; (9) List of Appendices.

  19. SPR Acquisition Procedures- Final Rulemaking

    Broader source: Energy.gov [DOE]

    Point of Contact:  Thomas McGarry, Director of Operatons and Readiness, Strategic Petroleum Reserve,  (202) 586-8197

  20. Step 4: Project Implementation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Process Step 4: Project Implementation Presentation Agenda * Step 4: Project Implementation - Pre-construction - Contract execution - Interconnection - Project construction - Commissioning * Project Example 2 1/28/2016 2 1 Potential 3 Refinement 5 Operations & Maintenance 2 Options 4 Implementation 4 Implementation 3 Potential Options Refinement Implementation Operations & Maintenance Step 4: Implementation 4 Purpose: Contract and begin physical construction of project Tasks: * Finalize

  1. IMPLEMENTATION_PLAN_FINAL.cdr

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vision Statement. . . . . . . . . . . . . . . . 5 Environmental Justice Core Principles. . ... Environmental Justice Core Principles 5 BPA Bonneville Power Authority EERE Energy ...

  2. Verification of simplified procedures for site-specific SO sub 2 and NOx control cost estimates. Final report, March 1988-May 1989

    SciTech Connect (OSTI)

    Emmel, T.E.; Maibodi, M.

    1990-02-01

    The report documents results of an evaluation to verify the accuracy of simplified procedures for estimating sulfur dioxide (SO2) and nitrogen oxides (NOx) retrofit control costs and performance for 200 SO2-emitting coal-fired power plants in the 31-state eastern region. Initially, detailed retrofit studies were conducted for 12 coal-fired plants in Ohio, Kentucky, and the Tennessee Valley Authority system. Because detailed studies are expensive and time-consuming, results from the 12-plant study were used to develop simplified procedures which require less time, data, and preparation effort. The evaluation compared the costs for a number of plants estimated using the simplified procedures to costs estimated using detailed procedures, actual retrofit costs, and more detailed cost estimates provided by utility companies. Based on the evaluation, recommendations for changes to the simplified procedures were developed. Control technologies addressed in the report are conventional lime/limestone flue gas desulfurization, lime spray drying, furnace sorbent injection, duct spray drying, coal switching, physical coal cleaning, and selective catalytic reduction. In general, it was found that the simplified procedures can be used to generate improved cost performance estimates based on generally available information.

  3. Case Studies of integrated hydrogen systems. International Energy Agency Hydrogen Implementing Agreement, Final report for Subtask A of task 11 - Integrated Systems

    SciTech Connect (OSTI)

    Schucan, T.

    1999-12-31

    Within the framework of the International Energy Agency Hydrogen Implementing Agreement, Task 11 was undertaken to develop tools to assist in the design and evaluation of existing and potential hydrogen demonstration projects. Emphasis was placed on integrated systems, from input energy to hydrogen end use. Included in the PDF document are the Executive Summary of the final report and the various case studies. The activities of task 11 were focused on near- and mid-term applications, with consideration for the transition from fossil-based systems to sustainable hydrogen energy systems. The participating countries were Canada, Italy, Japan, the Netherlands, Spain, Switzerland and the United States. In order for hydrogen to become a competitive energy carrier, experience and operating data need to be generated and collected through demonstration projects. A framework of scientific principles, technical expertise, and analytical evaluation and assessment needed to be developed to aid in the design and optimization of hydrogen demonstration projects to promote implementation. The task participants undertook research within the framework of three highly coordinated subtasks that focused on the collection and critical evaluation of data from existing demonstration projects around the world, the development and testing of computer models of hydrogen components and integrated systems, and the evaluation and comparison of hydrogen systems. While the Executive Summary reflects work on all three subtasks, this collection of chapters refers only to the work performed under Subtask A. Ten projects were analyzed and evaluated in detail as part of Subtask A, Case Studies. The projects and the project partners were: Solar Hydrogen Demonstration Project, Solar-Wasserstoff-Bayern, Bayernwerk, BMW, Linde, Siemens (Germany); Solar Hydrogen Plant on Residential House, M. Friedli (Switzerland); A.T. Stuart Renewable Energy Test Site; Stuart Energy Systems (Canada); PHOEBUS Juelich

  4. Building Energy Simulation Test for Existing Homes (BESTEST-EX): Instructions for Implementing the Test Procedure, Calibration Test Reference Results, and Example Acceptance-Range Criteria

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Building Energy Codes Program Building Energy Codes Program An estimated 75% of U.S. buildings will be new or renovated by 2035. Building energy codes ensure they use energy efficiently over the life of the building. An estimated 75% of U.S. buildings will be new or renovated by 2035. Building energy codes ensure they use energy efficiently over the life of the building. The Building Technologies Office (BTO) supports the development and implementation of residential and commercial building

  5. NSF final project report planning and implementation of the U.S. Joint Global Ocean Flux Study (U.S. JGOFS)

    SciTech Connect (OSTI)

    Livingston, Hugh D.

    1996-07-01

    Conducted planning and implementation of ocean carbon dioxide hydrographic surveys ocean process studies, time-series studies of Bermuda and Hawaii, and sponsored scientific workshops for those activities.

  6. ISSUANCE 2015-07-17: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    17: Energy Conservation Program: Test Procedures for Clothes Washers, Final Rule ISSUANCE 2015-07-17: Energy Conservation Program: Test Procedures for Clothes Washers, Final Rule ...

  7. 2014-04-10 Issuance: Test Procedures for Commercial Refrigeration...

    Office of Environmental Management (EM)

    0 Issuance: Test Procedures for Commercial Refrigeration Equipment; Final Rule 2014-04-10 Issuance: Test Procedures for Commercial Refrigeration Equipment; Final Rule This document ...

  8. ISSUANCE 2015-06-18: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    18: Energy Conservation Program: Test Procedures for Conventional Ovens, Final Rule ISSUANCE 2015-06-18: Energy Conservation Program: Test Procedures for Conventional Ovens, Final ...

  9. Quality Procedure - Audits | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Audits Quality Procedure - Audits This procedure establishes the responsibilities and process for scheduling, planning, performing, and reporting Quality Assurance (QA) audits of EM-QA-001, Environmental Management Quality Assurance Program implementation at EM Headquarters and Field Office programs, facilities and projects. Quality Procedure - Audits (5.04 MB) More Documents & Publications Quality Procedure - Document Control Quality Procedure - Supplier Qualification Quality Procedure -

  10. Council on Environmental Quality - Regulations for Implementing...

    Open Energy Info (EERE)

    Implementing the Procedural Provisions of the NEPALegal Abstract These regulations set forth the processes and procedures of the National Environmental Policy Act. Published NA...

  11. Final Report. SFAA No. DEFC02-98CH10961. Technical assistance for joint implementation and other supporting mechanisms and measures for greenhouse gas emissions mitigation

    SciTech Connect (OSTI)

    Knight, Denise

    2001-10-15

    IIEC, a division of CERF, has developed an extensive base of experience implementing activities that support climate action by developing USIJI projects in transitional countries within Asia, Latin America, Central and Eastern Europe, and southern Africa. IIEC has been able to provide a range of technical and policy assistance to governments and industry in support of sustainable energy use. IIEC continues to work in key countries with local partners to develop and implement energy efficiency policies and standards, develop site-specific projects, and assist governing bodies to establish national priorities and evaluation criteria for approving GHG-mitigation projects. As part of this project, IIEC focused on promoting a series of activities in Thailand and South Africa in order to identify GHG mitigation projects and work within the national approval process of those countries. The sections of this report outline the activities conducted in each country in order to achieve that goal.

  12. Preamble - National Environmental Policy Act Implementing Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    states that it believes this is consistent with the order language. The Department does not believe that the Board's recommendation would be consistent with the order language. ...

  13. New Mexico Antidegradation Policy Implementation Procedure |...

    Open Energy Info (EERE)

    the Antidegradation Policy in NMAC 20.6.4.8. Author New Mexico Water Quality Control Commission Published New Mexico Water Quality Control Commission, 2010 DOI Not...

  14. DOE National Environmental Policy Act Implementing Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... storage rings, colliders, and detectors, for research and medical purposes (such as proton therapy), and isotope production, within or contiguous to a previously disturbed or ...

  15. Reporting Cooperating Agencies in Implementing the Procedural...

    Broader source: Energy.gov (indexed) [DOE]

    agencies in the preparation of analyses and documentation required by the National Environmental Policy Act (NEPA). This document supersedes the reporting section of...

  16. Final Scientific/Technical Report for DOE/EERE Comprehensive Community Renewable Energy Implementation Plan in Forest County and Milwaukee County

    SciTech Connect (OSTI)

    Karman, Nathan

    2014-06-27

    Forest County Potawatomi Community (the “Community”) sought and obtained Community Renewable Energy Deployment funding from the Department of Energy to evaluate and implement a diverse number of renewable energy technologies throughout its lands held in trust or owned in fee simple in Forest County and Milwaukee County (the “Project”). The technologies and sites evolved during the Project, ultimately leading to the investigation of biomass and solar projects on the Community’s reservation in Forest County, as well as the investigation and eventual deployment of a solar project and an anaerobic digestion and biogas project on Community lands in Milwaukee.

  17. Emergency Procedures

    Broader source: Energy.gov [DOE]

    Note: This page is pending deletion, please refer to the Safety and health main page for emergency procedure information:

  18. Implementation of Executive Order 12114 Environmental Effects...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Implementation of Executive Order 12114 Environmental Effects Abroad of Major Federal Actions: Final Guideline (DOE, 1981) Implementation of Executive Order 12114 Environmental ...

  19. DOE Publishes Final Rule for the Request for Exclusion of 100...

    Broader source: Energy.gov (indexed) [DOE]

    Articles DOE Publishes Final Rule for Residential Furnace Fan Test Procedure DOE Publishes Final Rule for Plumbing Products Test Procedures DOE Publishes Final Rule for Television...

  20. Assessment of technologies for hazardous waste site remediation: Non-treatment technologies and pilot scale facility implementation -- excavation -- storage technology -- safety analysis and review statement. Final report

    SciTech Connect (OSTI)

    Johnson, H.R.; Overbey, W.K. Jr.; Koperna, G.J. Jr.

    1994-02-01

    The purpose of this study is to assess the state-of-the-art of excavation technology as related to environmental remediation applications. A further purpose is to determine which of the excavation technologies reviewed could be used by the US Corp of Engineers in remediating contaminated soil to be excavated in the near future for construction of a new Lock and Dam at Winfield, WV. The study is designed to identify excavation methodologies and equipment which can be used at any environmental remediation site but more specifically at the Winfield site on the Kanawha River in Putnam County, West Virginia. A technical approach was determined whereby a functional analysis was prepared to determine the functions to be conducted during the excavation phase of the remediation operations. A number of excavation technologies were identified from the literature. A set of screening criteria was developed that would examine the utility and ranking of the technologies with respect to the operations that needed to be conducted at the Winfield site. These criteria were performance, reliability, implementability, environmental safety, public health, and legal and regulatory compliance. The Loose Bulk excavation technology was ranked as the best technology applicable to the Winfield site. The literature was also examined to determine the success of various methods of controlling fugitive dust. Depending upon any changes in the results of chemical analyses, or prior remediation of the VOCs from the vadose zone, consideration should be given to testing a new ``Pneumatic Excavator`` which removes the VOCs liberated during the excavation process as they outgas from the soil. This equipment however would not be needed on locations with low levels of VOC emissions.

  1. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... administrative controls, worker training, industrial hygiene procedures, occupational medicine programs and oversight 2009-present" Final Meeting Summary Page 4 Health, Safety ...

  2. ISSUANCE 2015-06-26: Energy Conservation Program: Test Procedures...

    Broader source: Energy.gov (indexed) [DOE]

    Test Procedures for Dehumidifiers, Final Rule. dehumidtpfinalrule.pdf (734.28 KB) More Documents & Publications ISSUANCE 2015-01-27: Energy Conservation Program: Test Procedures ...

  3. ISSUANCE 2015-06-08: Energy Conservation Program: Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Test Procedures for Packaged Terminal Air Conditioners and Packaged Terminal Heat Pumps, Final Rule ISSUANCE 2015-06-08: Energy Conservation Program: Test Procedures for ...

  4. ISSUANCE 2015-12-18: Energy Conservation Program: Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    12-18: Energy Conservation Program: Test Procedures for Commercial Prerinse Spray Valves, Final Rule ISSUANCE 2015-12-18: Energy Conservation Program: Test Procedures for ...

  5. ISSUANCE 2015-08-17: Energy Conservation Program: Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7: Energy Conservation Program: Test Procedures for External Power Supplies, Final Rule ISSUANCE 2015-08-17: Energy Conservation Program: Test Procedures for External Power Supplies, ...

  6. EIS-0312: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0312: Final Environmental Impact Statement Fish and Wildlife Implementation Plan In this final environmental impact statement (FEIS), with...

  7. ISSUANCE 2015-12-15: Energy Conservation Program: Test Procedures...

    Broader source: Energy.gov (indexed) [DOE]

    Program: Test Procedures for Ceiling Fan Light Kits, Final Rule. cflk tp final rule 2015-12-15.pdf (817.76 KB) More Documents & Publications 2014-10-27 Issuance: Test Procedure for ...

  8. A RECIPE FOR LINEAR COLLIDER FINAL FOCUS SYSTEM DESIGN

    SciTech Connect (OSTI)

    Seryi, Andrei

    2003-05-27

    The design of Final Focus systems for linear colliders is challenging because of the large demagnifications needed to produce nanometer-sized beams at the interaction point. Simple first- and second-order matrix matching have proven insufficient for this task, and minimization of third- and higher-order aberrations is essential. An appropriate strategy is required for the latter to be successful. A recipe for Final Focus design, and a set of computational tools used to implement this approach, are described herein. An example of the use of this procedure is given.

  9. 2015-12-30 Energy Conservation Program: Test Procedure for Pumps...

    Broader source: Energy.gov (indexed) [DOE]

    Test Procedure for Pumps Final Rule Pumps Test Procedure Final Rule.pdf (1.85 MB) More Documents & Publications Energy Conservation Program: Test Procedure for Pumps, Notice of ...

  10. Lawrence Livermore Site Office Safety Basis Self-Assessment Final...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DISCUSSION of RESULTS 1. LSO procedures and mechanisms address and implement 10 CFR 830 ... development and implementation of fully compliant documented safety analyses (DSAs) and ...

  11. Subsea HIPPS design procedure

    SciTech Connect (OSTI)

    Aaroe, R.; Lund, B.F.; Onshus, T.

    1995-12-31

    The paper is based on a feasibility study investigating the possibilities of using a HIPPS (High Integrity Pressure Protection System) to protect a subsea pipeline that is not rated for full wellhead shut-in pressure. The study was called the Subsea OPPS Feasibility Study, and was performed by SINTEF, Norway. Here, OPPS is an acronym for Overpressure Pipeline Protection System. A design procedure for a subsea HIPPS is described, based on the experience and knowledge gained through the ``Subsea OPPS Feasibility Study``. Before a subsea HIPPS can be applied, its technical feasibility, reliability and profitability must be demonstrated. The subsea HIPPS design procedure will help to organize and plan the design activities both with respect to development and verification of a subsea HIPPS. The paper also gives examples of how some of the discussed design steps were performed in the Subsea OPPS Feasibility Study. Finally, further work required to apply a subsea HIPPS is discussed.

  12. Implementation Manual

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Skip navigation links BPA Energy Efficiency Plan BPA Post-2011 EE Role Implementation Manual Archives IM Document Library Interim Solution 2.0 Files Low Income Efficiency...

  13. Policies and Procedures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    procedures Policies and Procedures Guidelines Safety Computer Security Conduct of Operations JLF Forms Publication Policy

  14. Specified assurance level sampling procedure

    SciTech Connect (OSTI)

    Willner, O.

    1980-11-01

    In the nuclear industry design specifications for certain quality characteristics require that the final product be inspected by a sampling plan which can demonstrate product conformance to stated assurance levels. The Specified Assurance Level (SAL) Sampling Procedure has been developed to permit the direct selection of attribute sampling plans which can meet commonly used assurance levels. The SAL procedure contains sampling plans which yield the minimum sample size at stated assurance levels. The SAL procedure also provides sampling plans with acceptance numbers ranging from 0 to 10, thus, making available to the user a wide choice of plans all designed to comply with a stated assurance level.

  15. Procedures - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procedures You must be logged in with your Berkeley Lab LDAP to view these documents PUB-3000 Cyclotron Procedures Mechanical Procedures Electrical Procedures Ion Source Procedures Accelerator Safety (SAD & ASE) Radiological Work Authorizations Memorandums Forms Abbreviations & Acronyms

  16. 2014-04-10 Issuance: Test Procedures for Commercial Refrigeration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Equipment; Final Rule | Department of Energy 0 Issuance: Test Procedures for Commercial Refrigeration Equipment; Final Rule 2014-04-10 Issuance: Test Procedures for Commercial Refrigeration Equipment; Final Rule This document is a pre-publication Federal Register final rule regarding test procedures for commercial refrigeration equipment, as issued by the Deputy Assistant Secretary for Energy Efficiency on April 10, 2014. Though it is not intended or expected, should any discrepancy occur

  17. Final Optics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    final optics Final Optics Schematic layout of NIF's final optics assembly (FOA). The suite of optics for one beamline is on the right. The final optics assemblies (FOAs) are the last element of the main laser system and the first of the target area systems. Each FOA contains four integrated optics modules (IOMs) that incorporate beam conditioning, frequency conversion, focusing, diagnostic sampling, and debris shielding capabilities into a single compact assembly. These optics are shown in the

  18. ISSUANCE 2016-05-06: Energy Conservation Program: Test Procedure for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Battery Chargers, Final Rule | Department of Energy Test Procedure for Battery Chargers, Final Rule ISSUANCE 2016-05-06: Energy Conservation Program: Test Procedure for Battery Chargers, Final Rule This document is the Energy Conservation Program: Test Procedure for Battery Chargers, Final Rule. Battery Chargers TP Final Rule.pdf (449.69 KB) More Documents & Publications 2014-05-08 Issuance: Test Procedures for Battery Chargers; Notice of Data Availability ISSUANCE 2015-07-27: Energy

  19. 2015-02-12 Issuance: Test Procedures for Portable Air Conditioners...

    Broader source: Energy.gov (indexed) [DOE]

    ISSUANCE 2016-04-26: Energy Conservation Program: Test Procedures for Portable Air Conditioners, Final Rule ISSUANCE 2015-11-19: Energy Conservation Program: Test Procedures for ...

  20. Policy Guidance Memorandum #36 SES Competitive Staffing Procedures

    Broader source: Energy.gov [DOE]

    Policy Guidance Memorandum #36 provides overarching policy guidance and implementing procedures for the Senior Executive Service (SES) competitive recruitment process to ensure consistency,...

  1. Title 7 CFR 1794 Environmental Policies and Procedures | Open...

    Open Energy Info (EERE)

    CFR 1794 Environmental Policies and ProceduresLegal Abstract These regulations govern the Rural Utilities Services' implementation of NEPA. Published NA Year Signed or Took Effect...

  2. FINAL REPORT

    Office of Scientific and Technical Information (OSTI)

    FINAL REPORT Analytical and Elemental Analysis of Air and Soil Samples Facility and Public ... Information 4 Background 5 Stormwater Pollution 5 Erosion and Sediment Control Workshop ...

  3. FINAL RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RELEASE AWARDEE: ____________________________________________________ The work under Award No. DE-__________________________, dated ______________, between the United States of America (represented by the Department of Energy, National Energy Technology Laboratory, and the undersigned awardee, having been completed and finally accepted , and in consideration of Final Payment thereunder, the United States of America, its officers, agents and employees are hereby released from all liabilities,

  4. Operational Experiences Tuning the ATF2 Final Focus Optics Towards Obtaining a 37nm Electron Beam IP Spot Size

    SciTech Connect (OSTI)

    White, Glen; Seryi, Andrei; Woodley, Mark; Bai, Sha; Bambade, Philip; Renier, Yves; Bolzon, Benoit; Kamiya, Yoshio; Komamiya, Sachio; Oroku, Masahiro; Yamaguchi, Yohei; Yamanaka, Takashi; Kubo, Kiyoshi; Kuroda, Shigeru; Okugi, Toshiyuki; Tauchi, Toshiaki; Marin, Eduardo; /CERN

    2012-07-06

    The primary aim of the ATF2 research accelerator is to test a scaled version of the final focus optics planned for use in next-generation linear lepton colliders. ATF2 consists of a 1.3 GeV linac, damping ring providing low-emittance electron beams (< 12pm in the vertical plane), extraction line and final focus optics. The design details of the final focus optics and implementation at ATF2 are presented elsewhere. The ATF2 accelerator is currently being commissioned, with a staged approach to achieving the design IP spot size. It is expected that as we implement more demanding optics and reduce the vertical beta function at the IP, the tuning becomes more difficult and takes longer. We present here a description of the implementation of the tuning procedures and describe operational experiences and performances.

  5. Final Report

    SciTech Connect (OSTI)

    Gurney, Kevin R

    2015-01-12

    This document constitutes the final report under DOE grant DE-FG-08ER64649. The organization of this document is as follows: first, I will review the original scope of the proposed research. Second, I will present the current draft of a paper nearing submission to Nature Climate Change on the initial results of this funded effort. Finally, I will present the last phase of the research under this grant which has supported a Ph.D. student. To that end, I will present the graduate student’s proposed research, a portion of which is completed and reflected in the paper nearing submission. This final work phase will be completed in the next 12 months. This final workphase will likely result in 1-2 additional publications and we consider the results (as exemplified by the current paper) high quality. The continuing results will acknowledge the funding provided by DOE grant DE-FG-08ER64649.

  6. Final Report

    SciTech Connect (OSTI)

    Biros, George

    2014-08-18

    This the final report for the project "Large-Scale Optimization for Bayesian Inference in Complex Systems," for the work in the group of the co-PI George Biros.

  7. Final Report

    SciTech Connect (OSTI)

    DeTar, Carleton

    2012-12-10

    This document constitutes the Final Report for award DE-FC02-06ER41446 as required by the Office of Science. It summarizes accomplishments and provides copies of scientific publications with significant contribution from this award.

  8. ISSUANCE 2015-06-26: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Dehumidifiers, Final Rule | Department of Energy 6: Energy Conservation Program: Test Procedures for Dehumidifiers, Final Rule ISSUANCE 2015-06-26: Energy Conservation Program: Test Procedures for Dehumidifiers, Final Rule This document is the Energy Conservation Program: Test Procedures for Dehumidifiers, Final Rule. dehumid_tp_finalrule.pdf (734.28 KB) More Documents & Publications ISSUANCE 2015-01-27: Energy Conservation Program: Test Procedures for Dehumidifiers Supplemental Notice

  9. ISSUANCE 2015-07-17: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Clothes Washers, Final Rule | Department of Energy 7: Energy Conservation Program: Test Procedures for Clothes Washers, Final Rule ISSUANCE 2015-07-17: Energy Conservation Program: Test Procedures for Clothes Washers, Final Rule This document is the Energy Conservation Program: Test Procedures for Clothes Washers, Final Rule. clothes_washers_tp_finalrule.pdf (1.53 MB) More Documents & Publications 2014-04-11 Issuance: Test Procedures for Residential Clothes Washers; Notice of Proposed

  10. Awardee Share Procedures

    Broader source: Energy.gov (indexed) [DOE]

    Share Procedures Procedures for Correctly Reporting Awardee Share on the FAADSFAADS Plus reporting screen in STRIPES To ensure proper reporting by DOE to USASpending.gov, you...

  11. ISSUANCE 2016-05-19: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Central Air Conditioners and Heat Pumps Final Rule | Department of Energy 5-19: Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps Final Rule ISSUANCE 2016-05-19: Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps Final Rule This document is the Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps Final Rule. Central Air Conditioners and Heat Pumps TP Final Rule.pdf (2.2 MB) More

  12. Title 10 CFR 1021 National Environmental Policy Act Implementing...

    Open Energy Info (EERE)

    1021 National Environmental Policy Act Implementing Procedures Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal...

  13. IWARS Final

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE/IG-0631 Audit Report Implementation of Indications, Warning, Analysis and Reporting Capability December 2003 Reporting Cyber Security Incidents Details of Finding ........................................................................1 Recommendations and Comments .............................................4 Appendices 1. Objective, Scope, and Methodology ......................................6 2. Prior Audit Reports .................................................................7 3.

  14. AVTA: Full-Size Electric Vehicle Specifications and Test Procedures |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Full-Size Electric Vehicle Specifications and Test Procedures AVTA: Full-Size Electric Vehicle Specifications and Test Procedures EV America Test Specifications (97.12 KB) ETA-TP001 Implementation of SAE Standard J1263, February 1996 - Road Load Measurement and Dynamometer Simulation Using Coastdown Techniques (55.05 KB) ETA-TP002 Implementation of SAE Standard J1666, May 1993 - Electric Vehicle Acceleration, Gradeability, and Deceleration Test Procedure (81.38 KB)

  15. AVTA: Urban Electric Vehicle Specifications and Test Procedures |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Urban Electric Vehicle Specifications and Test Procedures AVTA: Urban Electric Vehicle Specifications and Test Procedures UEVAmerica Specifications (252.08 KB) ETA-UTP001 Implementation of SAE Standard J1263, Feb. 1996 - Road Load Measurement and Dynamometer Simulation Using Coastdown Techniques (50.53 KB) ETA-UTP002 Implementation of SAE Standard J1666, May 1993 - Electric Vehicle Acceleration, Gradeability, and Deceleration Test Procedure (65.68 KB) ETA-UTP003

  16. Preparing for Project Implementation Financing Project Implementation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Financing Project Implementation Save Energy Now LEADER Web Conference Project Implementation Seminar Series Save Energy Now LEADER Web Conference Agenda Seminar Series ...

  17. Reference Manual and Procedures for Implementation of PURPA Standards...

    Energy Savers [EERE]

    Smart Grid: Data Access, Third Party Use, and Privacy- Request for Information Demand Response and Smart Metering Policy Actions Since the Energy Policy Act of 2005: A Summary ...

  18. NEPA Implementation Procedures: Appendices I, II, and III (CEQ, 1984)

    Broader source: Energy.gov [DOE]

    These appendices were prepared by the Council on Environmental Quality (CEQ) to improve public participation and facilitate agency compliance with the National Environmental Policy Act and the CEQ's regulations.

  19. NEPA Implementation Procedures: Appendices I, II, and III

    Broader source: Energy.gov [DOE]

    These appendices are intended to improve public participation and facilitate agency compliance with the National Environmental Policy Act (NEPA) and the Council on Environmental Quality's NEPA...

  20. PART 1021-NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... the quality of the environment of the United States, its territories or possessions. ... 101(14) of CERCLA (42 U.S.C. 9601.101(14)). Radionuclides are Effective Nov 14, 2011 4 ...

  1. Final Report

    SciTech Connect (OSTI)

    Marchant, Gary E.

    2013-04-23

    This is the final report of a two year project entitled "Governing Nanotechnology Risks and Benefits in the Transition to Regulation: Innovative Public and Private Approaches." This project examined the role of new governance or "soft law" mechanisms such as codes of conduct, voluntary programs and partnership agreements to manage the risks of emerging technologies such as nanotechnology. A series of published or in publication papers and book chapters are attached.

  2. Computerized procedures system

    SciTech Connect (OSTI)

    Lipner, Melvin H.; Mundy, Roger A.; Franusich, Michael D.

    2010-10-12

    An online data driven computerized procedures system that guides an operator through a complex process facility's operating procedures. The system monitors plant data, processes the data and then, based upon this processing, presents the status of the current procedure step and/or substep to the operator. The system supports multiple users and a single procedure definition supports several interface formats that can be tailored to the individual user. Layered security controls access privileges and revisions are version controlled. The procedures run on a server that is platform independent of the user workstations that the server interfaces with and the user interface supports diverse procedural views.

  3. Microsoft Word - Summit EA Final 8-17-15.docx

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Act (NEPA), the Council on Environmental Quality (CEQ) Regulations for Implementing the Procedural ... NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), ...

  4. Microsoft Word - HAB_2010_0616_RAP_FINAL.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... focus changed to the Hanford Comprehensive Land Use Plan Environmental Impact Statement (HCP-EIS). ... and implementing controls and procedures were issued November 12, 1999. In ...

  5. Federal Agency NEPA Procedures

    Broader source: Energy.gov [DOE]

    Each Federal agency is required to develop NEPA procedures that supplement the CEQ Regulations. Developed in consultation with CEQ, Federal agency NEPA procedures must meet the standards in the CEQ...

  6. TRUPACT-1 implementation plan

    SciTech Connect (OSTI)

    Hurley, J.D.; Tappen, J.J. . Joint Integration Office); Christensen, D.S. )

    1985-09-01

    TRUPACT-1, the TRansUranic PACkage Transporter is a packaging designed to transport defense contact handled transuranic (CH-TRU) waste from generating and interim TRU waste storage facilities to the Waste Isolation Pilot Plant (WIPP). Prior to fabrication and procurement of a full fleet, an initial design (TRUPACT-1) will be introduced to the defense TRU waste complex through use in an operational prototype fleet which will consist of Units 1, 2, and 3. In an effort to provide a relatively smooth introduction of the TRUPACT-1, the TRUPACT Technical Team (TTT) has developed the following implementation plan. The plan provides detailed information on user handling opportunities, schedules, equipment, responsibilities, reporting and data collection activities to be performed. The intent of this document is to provide users of the TRUPACT-1 with a guidance document, complete with references, that will allow the smooth introduction of this new transportation system by providing the information necessary for collecting operational, performance and cost data. These data will be used in modeling and full fleet design and procurement activities. In addition, these data will help fine tune procedures in the inspection and maintenance document and the operational document. Additional objectives of this plan are to aid in the establishment of site operational, inspection and maintenance procedures as well as training of site operators and briefing state and local officials.

  7. Final Report

    SciTech Connect (OSTI)

    R Paul Drake

    2004-01-12

    OAK-B135 This is the final report from the project Hydrodynamics by High-Energy-Density Plasma Flow and Hydrodynamics and Radiation Hydrodynamics with Astrophysical Applications. This project supported a group at the University of Michigan in the invention, design, performance, and analysis of experiments using high-energy-density research facilities. The experiments explored compressible nonlinear hydrodynamics, in particular at decelerating interfaces, and the radiation hydrodynamics of strong shock waves. It has application to supernovae, astrophysical jets, shock-cloud interactions, and radiative shock waves.

  8. Final Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    352 Regulatory and Utility Solutions to Advance SunShot Initiative Goals Interstate Renewable Energy Council, Inc. FINAL REPORT Project Title: "Regulatory and Utility Solutions to Advance SunShot Initiative Goals" Covering Period: 09/01/11 through 02/28/15 Date of Report: 04/20/2015 Recipient: Interstate Renewable Energy Council, Inc. (IREC) Award Number: DE-EE0005352 Working Partners: Keyes, Fox & Wiedman LLP Michael T. Sheehan Sherwood Associates, Inc. Kris Mayes Law Firm (KMLF)

  9. ISSUANCE 2015-06-18: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Conventional Ovens, Final Rule | Department of Energy 18: Energy Conservation Program: Test Procedures for Conventional Ovens, Final Rule ISSUANCE 2015-06-18: Energy Conservation Program: Test Procedures for Conventional Ovens, Final Rule This document is the Energy Conservation Program: Test Procedures for Conventional Ovens, Final Rule. conventional_ovens_tp_finalrule.pdf (448.83 KB) More Documents & Publications ISSUANCE 2015-05-29: Energy Conservation Program: Energy Conservation

  10. Test Procedure for Compact Fluorescent Lamps: Final Rule | Department of

    Office of Environmental Management (EM)

    Analysis » Technology Pathways Technology Pathways The Bioenergy Technologies Office (BETO) pursues a pathway approach for advancing research and development (R&D) of converting biomass into renewable fuels and products. Following the BETO's successful demonstration of cost-competitive cellulosic ethanol production technologies-R&D efforts now focus on the conversion of biomass into hydrocarbon fuels and intermediates that lead to "drop-in" replacements for gasoline, diesel,

  11. U.S. - Canada Power System Outage Task Force: Final Report on...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - Canada Power System Outage Task Force: Final Report on the Implementation of Task Force Recommendations U.S. - Canada Power System Outage Task Force: Final Report on the ...

  12. RPSEA REPORT PROCEDURES

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RPSEA Final Technical Report 08121.2201.02.FINAL Heavy Viscous Oil Pressure, Volume, and ... the physical properties of heavy viscous oil systems is a k ey aspect of a successful ...

  13. Participant Registration Procedure

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    operations / participant registration procedure Participant Registration Procedure Under The "Safety" banner in the JLF Website "Policies and Procedures" Section: Complete Laser Eye Examination. Complete in LTRAIN HS5200-W Laser Safety. Complete in LTRAIN HS4258-W Beryllium (Be) Awareness. Complete in LTRAIN HS4261-W Lead (Pb) Awareness. Complete in LTRAIN HS5229-W Electrical Safety Awareness. Complete in LTRAIN HS-6001-W General Employee Radiological Training. Complete in

  14. Simplified Acquisition Procedures

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ------------------------- Chapter 13.3 (March 2014) 1 [Reference: FAR Subpart 13. 3 and FAR Subpart 13.5] Simplified Acquisition Procedures 1. Introduction Simplified Acquisition Procedures (SAP) are contracting methods designed to streamline the acquisition process and facilitate the procurement of goods and services. The results include less paperwork and lower costs for both the contractor and the Government. FAR 13.003(a) states, "Agencies shall use simplified acquisition procedures to

  15. Final Report

    SciTech Connect (OSTI)

    Webb, Robert C.; Kamon, Teruki; Toback, David; Safonov, Alexei; Dutta, Bhaskar; Dimitri, Nanopoulos; Pope, Christopher; White, James

    2013-11-18

    Overview The High Energy Physics Group at Texas A&M University is submitting this final report for our grant number DE-FG02-95ER40917. This grant has supported our wide range of research activities for over a decade. The reports contained here summarize the latest work done by our research team. Task A (Collider Physics Program): CMS & CDF Profs. T. Kamon, A. Safonov, and D. Toback co-lead the Texas A&M (TAMU) collider program focusing on CDF and CMS experiments. Task D: Particle Physics Theory Our particle physics theory task is the combined effort of Profs. B. Dutta, D. Nanopoulos, and C. Pope. Task E (Underground Physics): LUX & NEXT Profs. R. Webb and J. White(deceased) lead the Xenon-based underground research program consisting of two main thrusts: the first, participation in the LUX two-phase xenon dark matter search experiment and the second, detector R&D primarily aimed at developing future detectors for underground physics (e.g. NEXT and LZ).

  16. ISSUANCE 2015-12-15: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ceiling Fan Light Kits, Final Rule | Department of Energy 15: Energy Conservation Program: Test Procedures for Ceiling Fan Light Kits, Final Rule ISSUANCE 2015-12-15: Energy Conservation Program: Test Procedures for Ceiling Fan Light Kits, Final Rule This document is the Energy Conservation Program: Test Procedures for Ceiling Fan Light Kits, Final Rule. cflk tp final rule 2015-12-15.pdf (817.76 KB) More Documents & Publications 2014-10-27 Issuance: Test Procedure for Ceiling Fan Light

  17. Final Rule on Amending Eligibility Provisions to Multifamily...

    Energy Savers [EERE]

    March 2, 2010 SUBJECT: FINAL RULE ON AMENDING ELIGIBILITY PROVISIONS TO MULTI-FAMILY BUILDINGS FOR THE WEATHERIZATION ASSISTANCE PROGRAM PURPOSE: To issue guidance on implementing...

  18. EA-1804: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the alternative of not implementing this project (the No-Action Alternative). Final Environmental Assessment for Sauk Valley Community College's Wind Energy Project, Dixon, Lee ...

  19. EA-1802: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and the alternative of not implementing this project (No-Action Alternative). Final Environmental Assessment for Chicago View Wind Project, Chicago Heights, Cook County, ...

  20. Text Delegation Procedures

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    Procedures for Line Managers' Delegations of Authority when proposing new delegations, redelegating existing delegation, proposing an amendment, rescinding a delegation, and when a delegation is not needed.

  1. NNMCAB Processes and Procedures

    Broader source: Energy.gov [DOE]

    At the January 8, 2014 Committee meeting NNMCAB Staff, Covered the Procedures and Processes that are used in Running the Board.

  2. AVTA: Full-Size Electric Vehicle Specifications and Test Procedures...

    Broader source: Energy.gov (indexed) [DOE]

    EV America Test Specifications (97.12 KB) ETA-TP001 Implementation of SAE Standard J1263, ... Gradeability, and Deceleration Test Procedure (81.38 KB) ETA-HP003 ...

  3. Final Report

    SciTech Connect (OSTI)

    Michael C. Weinberg; Lori L. Burgner; Joseph H. Simmons

    2003-05-23

    OAK B135 The formation of metastable crystalline phases in lithium disilicate glass has been a subject of controversy for decades. Here, one aspect of this problem relating to the stability of these non-equilibrium phases when glasses are heated for extended time periods in the nucleation regime is addressed. The results of a systematic experimental investigation on the persistence of metastable phases and the factors that may influence the appearance of such phases, e.g., water content, impurities, glass composition, and glass preparation procedure are presented. Growth rates of lithium disilicate crystals in lithium disilicate glass are measured as a function water concentration in the glass and of temperature in the deeply undercooled regime. The growth rate data obtained in this work are combined with data reported in the literature and used to assess the applicability of standard models of crystal growth for the description of experimental results over a very broad temperature range. The reduced growth rate versus undercooling graph is found to consist of three regimes. For undercoolings less than 140C, the reduced growth rate curve is suggestive of either 2-D surface nucleation or screw dislocation growth. For undercoolings greater than 400C, the reduced growth rate plot suggests the operative crystal growth mechanism is 2-D surface nucleation, but detailed calculations cast doubt upon this conclusion. In the intermediate undercooling range, there appears to be some sort of transitional behavior for which none of the standard models appear to be applicable. Further, it is observed that small differences in the viscosity data employed can produce enormous differences in the predicted growth rates at larger undercoolings. Results of the kinetic analyses conducted herein seem to indicate that the nature of the kinetic rate coefficient used in the standard growth models may be incorrect. Nucleation rates of sodium metasilicate crystals in a sodium silicate

  4. Environmental Restoration Quality Program Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1992-08-01

    The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

  5. Final Report

    SciTech Connect (OSTI)

    Gentile, Thomas R.

    2014-03-14

    We propose to extend the technique of polarized neutron scattering into new domains by continued development and application of polarized 3He spin-filters. These devices are particularly relevant to the Spallation Neutron Source, as the polarizing monochromators historically used at reactor sources will usually not be suitable polarizers, and wide-angle polarization analysis will be essential. With prior support from the Office of Science, we have developed neutron spin-filters based on the large spin dependence of the cross section for neutron capture by 3He, and applied these devices to a small angle neutron scattering spectrometer (SANS), polarized neutron reflectometers, a thermal energy single crystal diffractometer (SCD), and a thermal energy triple-axis instrument. Our developments have been adopted for application on the magnetism reflectometer at the SNS and for the NIST Center for Neutron Research (NCNR) 3He user capability. Results from both these programs are emerging. We have made significant progress in the past grant period on wide-angle polarization analysis. We have also performed several studies relevant to continuous optical pumping, including collaboration on experiments that have revealed neutron beam effects on spin filters that are continuously pumped by spin-exchange optical pumping. We contributed to an experiment on a neutron interferometer, in which the successful results obtained are directly related to both 3He cell technology and high accuracy 3He -based neutron polarimetry. Implementation of wide-angle polarization analysis will continue to be key thrust for our work in this new proposal. We will also focus on continuous optical pumping and the fundamental issues that determine the achievable 3He polarization. This project will be carried out by a collaboration involving scientists at NIST, Indiana University, Hamilton College, and the Univ. of Wisconsin who are experts in 3He polarization techniques, and materials scientists from the

  6. Photocathode Optimization for a Dynamic Transmission Electron Microscope: Final Report

    SciTech Connect (OSTI)

    Ellis, P; Flom, Z; Heinselman, K; Nguyen, T; Tung, S; Haskell, R; Reed, B W; LaGrange, T

    2011-08-04

    The Dynamic Transmission Electron Microscope (DTEM) team at Harvey Mudd College has been sponsored by LLNL to design and build a test setup for optimizing the performance of the DTEM's electron source. Unlike a traditional TEM, the DTEM achieves much faster exposure times by using photoemission from a photocathode to produce electrons for imaging. The DTEM team's work is motivated by the need to improve the coherence and current density of the electron cloud produced by the electron gun in order to increase the image resolution and contrast achievable by DTEM. The photoemission test setup is nearly complete and the team will soon complete baseline tests of electron gun performance. The photoemission laser and high voltage power supply have been repaired; the optics path for relaying the laser to the photocathode has been finalized, assembled, and aligned; the internal setup of the vacuum chamber has been finalized and mostly implemented; and system control, synchronization, and data acquisition has been implemented in LabVIEW. Immediate future work includes determining a consistent alignment procedure to place the laser waist on the photocathode, and taking baseline performance measurements of the tantalum photocathode. Future research will examine the performance of the electron gun as a function of the photoemission laser profile, the photocathode material, and the geometry and voltages of the accelerating and focusing components in the electron gun. This report presents the team's progress and outlines the work that remains.

  7. AVTA: Neighborhood Electric Vehicle Specifications and Test Procedures |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Neighborhood Electric Vehicle Specifications and Test Procedures AVTA: Neighborhood Electric Vehicle Specifications and Test Procedures NEVAmerica Technical Specifications (135.99 KB) NEVAmerica Test Sequence (66.19 KB) ETA-NTP002 Implementation of SAE Standard J1666 May 93 - Electric Vehicle Acceleration, Gradeability, and Deceleration Test Procedure (334.01 KB) ETA-NTP004 Electric Vehicle Constant Speed Range Test (138.66 KB) ETA-NTP005 Electric Vehicle Rough Road

  8. Microsoft Word - Hooper_Springs_NWA_Implementation_Study_Final...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    efficient electric hot water heaters; historical heater installations represent a mix of geothermal or zonal systems for heating. Figure 14 illustrates that the rate of...

  9. WAPA Recovery Act Implementation Appropriation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WAPA Recovery Act Implementation Appropriation WAPA Recovery Act Implementation Appropriation Microsoft Word - PSRP May 15 2009 _WAPA Implementation Approp_ Final.docx (63.72 KB) More Documents & Publications Western Area Power Administration Borrowing Authority, Recovery Act Microsoft Word - PSRP Updates 6-25-10_v2 Bonneville Power Administration Program Specific Recovery Plan

  10. Text Redelegation Procedures - DOE Directives, Delegations, and...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Text Redelegation Procedures by Website Administrator Delegation Procedures Redelegation Procedures Redelegation Procedures for Functional Area Managers This page contains...

  11. Environmental Management (EM) Quality Procedures | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Procedure - Records Management Quality Procedure - MemoCorrespondence Control and Tracking Quality Procedure - Stop Work Quality Procedure - Supplier Qualification ...

  12. Implementing Executive Order 13423

    Broader source: Energy.gov [DOE]

    Guide describes the instructions on the requirements and how fleets should implement the Executive Order 13423.

  13. ARM - Publications Procedures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    govPublicationsPublications Procedures Page Contents Types of ARM Publications Process for Publishing Planning Documents Science Reports Conference Documents Public Information Materials Recommendation for Journal Articles Proper Acknowledgments Publications Procedures Types of ARM Publications There are two main types of publications in ARM: (1) planning documents and (2) science reports. Planning documents include the ARM Program Plan, Science Plan, Locale Recommendation Plan, and Site

  14. AVTA: Hybrid Electric Vehicle Specifications and Test Procedures |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Hybrid Electric Vehicle Specifications and Test Procedures AVTA: Hybrid Electric Vehicle Specifications and Test Procedures Fleet Test and Evaluation Procedure (231.85 KB) HEVAmerica Technical Specifications (164.3 KB) HEV Baseline Test Sequence (46.65 KB) HEV End of Life Test Sequence (29.89 KB) ETA-HTP01 Implementation of SAE Standard J1263 February 1996 - Road Load Measurement and Dynamometer Simulation Using Coastdown Techniques (118.71 KB) ETA-HTP02 Implementation

  15. 2015-02-13 Issuance: Test Procedure for Furnaces and Boilers...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications 2015-12-29 Consumer Furnaces and Boilers Test Procedures Final Rule ISSUANCE 2014-12-23: Energy Conservation Program for Consumer Products: Test ...

  16. 2014-06-27 Issuance: Test Procedures for Residential and Commercial...

    Broader source: Energy.gov (indexed) [DOE]

    solely as a means to facilitate the public's access to this document. 2014-06-27 Test Procedures for Residential and Commercial Water Heaters; Final Rule More Documents &...

  17. Proactive DSA application and implementation

    SciTech Connect (OSTI)

    Draelos, T.; Hamilton, V.; Istrail, G.

    1998-05-03

    Data authentication as provided by digital signatures is a well known technique for verifying data sent via untrusted network links. Recent work has extended digital signatures to allow jointly generated signatures using threshold techniques. In addition, new proactive mechanisms have been developed to protect the joint private key over long periods of time and to allow each of the parties involved to verify the actions of the other parties. In this paper, the authors describe an application in which proactive digital signature techniques are a particularly valuable tool. They describe the proactive DSA protocol and discuss the underlying software tools that they found valuable in developing an implementation. Finally, the authors briefly describe the protocol and note difficulties they experienced and continue to experience in implementing this complex cryptographic protocol.

  18. Nondestructive assay (NDA) techniques and procedures

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    Report No. 4 is precursory to Report No. 5 {open_quotes}Determination of the Quantity and Locations of the Pu Currently Retained in the Cimarron Fuel Plant Systems{close_quotes} which will be presented upon completion of the decontamination of the Cimarron Plutonium Fuel Fabrication Facility. This report presents the Non-Destructive Assay (NDA) procedures which were developed and used by Sequoyah Fuels Corporation (successor to Kerr-McGee Nuclear Corporation) to measure equipment hold-up of plutonium materials for inventory purposes during operation of the plant. These procedures are also used to measure plutonium contamination on the equipment removed from the Material Balance Areas (MBA`s) during final decontamination. Report No. 5 will compare the measurements taken during this final decontamination period to previous inventory hold-up measurements, the date will be statistically analyzed, and a long-term assessment of the performance of the NDA equipment will be described.

  19. Procedures for meeting NRC antitrust responsibilities

    SciTech Connect (OSTI)

    Toalston, A.L.; Messier, M.E.; Lambe, W.M.; Nicholson, P.R.

    1985-05-01

    This report describes the procedures used by NRC staff to implement the antitrust review and enforcement prescribed in Sections 105 and 186 of the Atomic Energy Act of 1954, as amended (the Act), as covered largely by the Commission's Rules and Regulations in 10 CFR Parts 2.101, 2.102, 2.200, 50.33a, 50.80, and 50.90. These procedures set forth the steps and criteria the staff applies in the antitrust review of construction permit and operating license applications and the amendments to those applications that deal with changes in ownership. In addition, the procedures describe how the staff enforces compliance by licensees when antitrust conditions have been appended to construction permits and operating licenses.

  20. Microbial degradation of low-level radioactive waste. Final report

    SciTech Connect (OSTI)

    Rogers, R.D.; Hamilton, M.A.; Veeh, R.H.; McConnell, J.W. Jr

    1996-06-01

    The Nuclear Regulatory Commission stipulates in 10 CFR 61 that disposed low-level radioactive waste (LLW) be stabilized. To provide guidance to disposal vendors and nuclear station waste generators for implementing those requirements, the NRC developed the Technical Position on Waste Form, Revision 1. That document details a specified set of recommended testing procedures and criteria, including several tests for determining the biodegradation properties of waste forms. Information has been presented by a number of researchers, which indicated that those tests may be inappropriate for examining microbial degradation of cement-solidified LLW. Cement has been widely used to solidify LLW; however, the resulting waste forms are sometimes susceptible to failure due to the actions of waste constituents, stress, and environment. The purpose of this research program was to develop modified microbial degradation test procedures that would be more appropriate than the existing procedures for evaluation of the effects of microbiologically influenced chemical attack on cement-solidified LLW. The procedures that have been developed in this work are presented and discussed. Groups of microorganisms indigenous to LLW disposal sites were employed that can metabolically convert organic and inorganic substrates into organic and mineral acids. Such acids aggressively react with cement and can ultimately lead to structural failure. Results on the application of mechanisms inherent in microbially influenced degradation of cement-based material are the focus of this final report. Data-validated evidence of the potential for microbially influenced deterioration of cement-solidified LLW and subsequent release of radionuclides developed during this study are presented.

  1. Next-to-leading order predictions for Z gamma+jet and Z gamma gamma final states at the LHC

    SciTech Connect (OSTI)

    Campbell, John M.; Hartanto, Heribertus B.; Williams, Ciaran

    2012-11-01

    We present next-to-leading order predictions for final states containing leptons produced through the decay of a Z boson in association with either a photon and a jet, or a pair of photons. The effect of photon radiation from the final state leptons is included and we also allow for contributions arising from fragmentation processes. Phenomenological studies are presented for the LHC in the case of final states containing charged leptons and in the case of neutrinos. We also use the procedure introduced by Stewart and Tackmann to provide a reliable estimate of the scale uncertainty inherent in our theoretical calculations of jet-binned Z gamma cross sections. These computations have been implemented in the public code MCFM.

  2. Final Technical Report

    SciTech Connect (OSTI)

    Pilewskie, Peter

    2009-05-27

    During the 1-year duration of this project a new Shortwave Spectrometer (SWS) was designed and developed for deployment at the Southern Great Plains Central Facility to measure zenith solar spectral radiance. The SWS is comprised of two Zeiss miniature monolithic spectrometers (MMS-1 and MMS-NIR) for visible and near-infrared detection in the wavelength range between 350 and 2250 nm. Spectral resolution is 8 nm for the MMS-1 and 12 nm for the MMS-NIR. The light collector is a narrow field of view (±1.5 º) collimator at the front end of a high-grade custom-made fiber optic bundle. The data acquisition and control system is a 933 MHz Pentium based PC in a PC104 format with a USB interface between the computer and the spectrometers. Spectral sampling rate is approximately 1 Hz. A prototype SWS was deployed at SGP in November and December 2004 and it collected zenith-sky solar spectra at 1 Hz continuously over a 29 day period. Prior to deployment it was calibrated and characterized at the NASA Ames Airborne Sensor Facility (ASF) using a 30 inch Integrating Sphere. The SWS was also calibrated using a portable 12 inch integrating sphere at the Central Facility. The testing and calibration procedures were developed during this implementation. The planning and scheduling for permanent installation of the new SWS as well as data processing, calibration, archiving, and distribution was conducted.

  3. Records Management Exit Procedures

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Records Management Exit Procedures For Departing Federal and contractor Employees PRESERVATION OF FEDERAL RECORDS The Federal Records Act requires the Department of Energy (DOE) Records Officer to remind departing Federal and contractor employees that Federal records may not be removed from Government custody nor may they be destroyed except in accordance with a records disposition schedule that has been approved by the Archivist of the United States. The creation of adequate documentation and

  4. Tiger LDRD final report

    SciTech Connect (OSTI)

    Steich, D J; Brugger, S T; Kallman, J S; White, D A

    2000-02-01

    This final report describes our efforts on the Three-Dimensional Massively Parallel CEM Technologies LDRD project (97-ERD-009). Significant need exists for more advanced time domain computational electromagnetics modeling. Bookkeeping details and modifying inflexible software constitute a vast majority of the effort required to address such needs. The required effort escalates rapidly as problem complexity increases. For example, hybrid meshes requiring hybrid numerics on massively parallel platforms (MPPs). This project attempts to alleviate the above limitations by investigating flexible abstractions for these numerical algorithms on MPPs using object-oriented methods, providing a programming environment insulating physics from bookkeeping. The three major design iterations during the project, known as TIGER-I to TIGER-III, are discussed. Each version of TIGER is briefly discussed along with lessons learned during the development and implementation. An Application Programming Interface (API) of the object-oriented interface for Tiger-III is included in three appendices. The three appendices contain the Utilities, Entity-Attribute, and Mesh libraries developed during the project. The API libraries represent a snapshot of our latest attempt at insulated the physics from the bookkeeping.

  5. Laboratory Analytical Procedures | Bioenergy | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory Analytical Procedures NREL develops laboratory analytical procedures (LAPs) to provide validated methods for biofuels and pyrolysis bio-oils research. Biomass Compositional Analysis These lab procedures provide tested and accepted methods for performing analyses commonly used in biofuels research. Bio-Oil Analysis These lab procedures allow for the analysis of raw and upgraded pyrolysis bio-oils. Microalgae Compositional Analysis These lab procedures help scientists and researchers

  6. Implementing Bayesian Statistics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Appliance & Equipment Standards » Implementation, Certification and Enforcement Implementation, Certification and Enforcement The U.S. Department of Energy (DOE) is authorized by the Energy Policy and Conservation Act of 1975 (as amended) to enforce compliance with the energy and water conservation standards established for certain consumer products and commercial and industrial equipment. To ensure the implementation of the current standards for covered appliances and equipment, DOE has

  7. Unveiling the Implementation Guide

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oak Ridge National Laboratory www.ornl.gov Unveiling the Implementation Guide October 11, 2011 Michaela Martin Program Manager Residential, Commercial, and Industrial Energy Efficiency Oak Ridge National Laboratory 2 | Oak Ridge National Laboratory www.ornl.gov Guiding Principles for Successfully Implementing Industrial Energy Assessment Recommendations * New resource for industry * Identifies key principles and actions that lead to successful implementation of energy assessment recommendations

  8. Unified Procedures Applicable to Major Federal Actions Relating to Nuclear Activities Subject to Executive Order 12114 (State Department, 1979)

    Broader source: Energy.gov [DOE]

    The following unified procedures issued by the State Department are established to satisfy the requirement of the Executive Order for implementing procedures concerning nuclear export activities of Federal agencies.

  9. Microalgal Biofuels Analysis Laboratory Procedures | Bioenergy...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Microalgal Biofuels Analysis Laboratory Procedures NREL develops laboratory analytical procedures (LAPs) for analyzing microalgal biofuels. These procedures help scientists and ...

  10. Redelegation Procedures - DOE Directives, Delegations, and Requirement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Breadcrumb >> Breadcrumb Redelegation Procedures by Website Administrator Text version available here. Delegation Procedures Re-Delegation Procedures Document Actions Redelegation...

  11. DOE Publishes Final Rule Regarding Post-Employment Restrictions

    Broader source: Energy.gov [DOE]

    The Department of Energy published a final rule establishing procedures under which a former employee of the executive branch may obtain approval to make communications to DOE solely for the...

  12. Current Human Reliability Analysis Methods Applied to Computerized Procedures

    SciTech Connect (OSTI)

    Ronald L. Boring

    2012-06-01

    Computerized procedures (CPs) are an emerging technology within nuclear power plant control rooms. While CPs have been implemented internationally in advanced control rooms, to date no US nuclear power plant has implemented CPs in its main control room (Fink et al., 2009). Yet, CPs are a reality of new plant builds and are an area of considerable interest to existing plants, which see advantages in terms of enhanced ease of use and easier records management by omitting the need for updating hardcopy procedures. The overall intent of this paper is to provide a characterization of human reliability analysis (HRA) issues for computerized procedures. It is beyond the scope of this document to propose a new HRA approach or to recommend specific methods or refinements to those methods. Rather, this paper serves as a review of current HRA as it may be used for the analysis and review of computerized procedures.

  13. Surface cleanliness measurement procedure

    DOE Patents [OSTI]

    Schroder, Mark Stewart; Woodmansee, Donald Ernest; Beadie, Douglas Frank

    2002-01-01

    A procedure and tools for quantifying surface cleanliness are described. Cleanliness of a target surface is quantified by wiping a prescribed area of the surface with a flexible, bright white cloth swatch, preferably mounted on a special tool. The cloth picks up a substantial amount of any particulate surface contamination. The amount of contamination is determined by measuring the reflectivity loss of the cloth before and after wiping on the contaminated system and comparing that loss to a previous calibration with similar contamination. In the alternative, a visual comparison of the contaminated cloth to a contamination key provides an indication of the surface cleanliness.

  14. LSU/CAMD Procedure

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procedure Doc. ID: EM-PR-0001-001.doc Emergency Date: 2014/04/15 1. Safety is the responsibility of all working at CAMD. 2. Display this document at all beamlines, hutches, control room, laboratories and cleanrooms. 3. Report all unsafe acts or processes immediately to the CAMD Safety Office, by dialing 8-4616 from any facility phone or paging the CAMD Safety Officer: 9-952-5892 4. Injuries must be reported if medical intervention (physician) is or has been required. Fill out accident report

  15. NNMCAB Meeting Procedure | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Meeting Procedure NNMCAB Meeting Procedure A quick guide to the parliamentary procedure used by the NNMCAB during full Board Meetings. NNMCAB Meeting Procedure Guide (198.19

  16. Procedures for Departing Employees | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procedures for Departing Employees Procedures for Departing Employees RM Exit Procedures (2)3.12.12.pdf (39.89 KB) More Documents & Publications Procedures for Departing Employees ...

  17. Procedures for Departing Employees | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procedures for Departing Employees Procedures for Departing Employees RM Exit Procedures.doc (337 KB) More Documents & Publications Procedures for Departing Employees Records ...

  18. Oracle accrual plans from requirements to implementation

    SciTech Connect (OSTI)

    Rivera, Christine K

    2009-01-01

    Implementing any new business software can be an intimidating prospect and this paper is intended to offer some insight in to how to approach this challenge with some fundamental rules for success. Los Alamos National Laboratory (LANL) had undergone an original ERP implementation of HRMS, Oracle Advanced Benefits, Worker Self Service, Manager Self Service, Project Accounting, Financials and PO, and recently completed a project to implement Oracle Payroll, Time and Labor and Accrual Plans. This paper will describe some of the important lessons that can be applied to any implementation as a whole, and then specifically how this knowledge was applied to the design and deployment of Oracle Accrual Plans for LANL. Finally, detail on the functionality available in Oracle Accrual Plans will be described, as well as the detailed setups.that were utilized at LANL.

  19. Earned Value Management System (EVMS) Corrective Action Standard Operating Procedure

    Broader source: Energy.gov [DOE]

    This EVMS Corrective Action Standard Operating Procedure (ECASOP) serves as PM's primary reference for development of Corrective Action Requests (CARs) and Continuous Improvement Opportunities (CIOs), as well as the assessment of contractors procedures and implementation associated with Variance Analysis Reports (VARs) and Corrective Action Plans (CAPs) in accordance with the EIA-748 (current version) EVMS standard. The SOP is based on regulatory guidance and standardized processes based upon a common understanding of EVMS Industry and Government best practices for use by the Department of Energy (DOE). All information contained herein provides detailed processes to implement the requirements in DOE O 413.3 Current Version.

  20. Life Cycle Cost (LCC) Handbook Final Version 9-30-14 | Department...

    Office of Environmental Management (EM)

    Final Version 9-30-14 This handbook provides procedures, information, examples, and tools to develop consistent and defensible life-cycle cost estimates (LCCE) and perform...

  1. Environmental protection Implementation Plan

    SciTech Connect (OSTI)

    R. C. Holland

    1999-12-01

    This ``Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ``Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities.

  2. Waste minimization assessment procedure

    SciTech Connect (OSTI)

    Kellythorne, L.L. )

    1993-01-01

    Perry Nuclear Power Plant began developing a waste minimization plan early in 1991. In March of 1991 the plan was documented following a similar format to that described in the EPA Waste Minimization Opportunity Assessment Manual. Initial implementation involved obtaining management's commitment to support a waste minimization effort. The primary assessment goal was to identify all hazardous waste streams and to evaluate those streams for minimization opportunities. As implementation of the plan proceeded, non-hazardous waste streams routinely generated in large volumes were also evaluated for minimization opportunities. The next step included collection of process and facility data which would be useful in helping the facility accomplish its assessment goals. This paper describes the resources that were used and which were most valuable in identifying both the hazardous and non-hazardous waste streams that existed on site. For each material identified as a waste stream, additional information regarding the materials use, manufacturer, EPA hazardous waste number and DOT hazard class was also gathered. Once waste streams were evaluated for potential source reduction, recycling, re-use, re-sale, or burning for heat recovery, with disposal as the last viable alternative.

  3. EVMS Surveillance Standard Operating Procedure (ESSOP)

    Broader source: Energy.gov [DOE]

    This EVMS Surveillance Standard Operating Procedure (ESSOP) serves as a primary reference for OAPM MA-63 when conducting EVM System-level assessments. DOE Order (O) 413.3B, the Office of Management and Budget (OMB) Circular A-11, and the Federal Acquisition Regulations (FAR) require implementation of an EVMS on DOE capital asset projects greater than $20M. The intent of this SOP is to provide processes based upon a common understanding of EVMS Industry and Government best practices for use by the Department of Energy (DOE) oversight, program, and project teams, as well as contractors doing business with DOE. Surveillance activities cover the areas of surveillance objectives, suggested processes, roles, and responsibilities. All information contained herein provides detailed processes to implement the requirements in DOE O 413.3B.

  4. British coal privatization procedures

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    The form in which British Coal is to be privatized has finally been announced. Offers are to be invited for the operating underground and opencast mines which will be grouped into five regionally based companies. Additionally, offers will be invited for a number of collieries which are currently under care and maintenance. The five Regional Coal Companies to be formed are Central North, which will comprise the assets in the Yorkshire and Durham coalfields, including the five collieries in the Selby Complex; Central South, which will contain the assets located in the Nottinghamshire, Leicestershire, Derbyshire, and Warwickshire coalfields; North East, which has four opencast sites, Scotland, which has nine operating open-cast sites and a single underground mine, Longannet; and South Wales with its nine operating opencast sites. Tower colliery, the last underground mine in South Wales, was finally put on care and maintenance on April 20, 1994. Details of the five Regional Coal Companies are given. A new public sector body, the Coal Authority will be set up to which all British Coal's title to unworked coal and coal mines will be transferred. All the relevant property rights and liabilities of British Coal will be transferred into the Regional Coal Companies prior to their sun.

  5. Full Final Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    REPOR FULL FINAL REPOR T T SECTION III SECTION III FULL FINAL REPORT SECTION III Individual Project Summaries Table of Contents Algal Biology ..................................................................................................3 Cultivation ...................................................................................................41 Harvesting and Extraction .............................................................................65 Fuel Conversion

  6. Text Delegation Procedures - DOE Directives, Delegations, and

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Text Delegation Procedures Delegation Procedures Re-Delegation Procedures by Website Administrator Procedures for Line Managers' Delegations of Authority when proposing new delegations, redelegating existing delegation, proposing an amendment, rescinding a delegation, and when a delegation is not needed. Delegation Procedures Redelegation Procedures Procedures for Delegations of Authority Please use the following procedures when Proposing New Delegations; Redelegating Existing

  7. Vehicle Technologies Program Implementation

    SciTech Connect (OSTI)

    none,

    2009-06-19

    The Vehicle Technologies Program takes a systematic approach to Program implementation. Elements of this approach include the evaluation of new technologies, competitive selection of projects and partners, review of Program and project improvement, project tracking, and portfolio management and adjustment.

  8. ORISE: Policy Implementation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Policy Implementation The Oak Ridge Institute for Science and Education (ORISE) assists the U.S. Department of Energy (DOE) Office of Science in the implementation of its program directed at ensuring compliance with federal and DOE regulations pertaining to the protection of human subjects participating in research. The Federal Policy for the Protection of Human Subjects was adopted by DOE on June 18, 1991, as Title 10 Code of Federal Regulations 745, Protection of Human Subjects, and expressed

  9. Program Evaluation: Monitor Implementation

    Broader source: Energy.gov [DOE]

    Once you have chosen the evaluation contractor, the next step is to work with the contractor to get the evaluation plan finalized and to provide the lists and other assistance the contractor needs....

  10. 1990 Weatherization Assistance Program monitoring. Final report

    SciTech Connect (OSTI)

    Samuels, L.S.

    1992-06-19

    The fiscal year 1990 DOE weatherization programs were monitored in Indiana, Ohio, and Wisconsin. The focus of the monitoring was on a total of 18 subgrantees. Separate reports on the monitoring completed on each site was submitted as well as the final summary report for each state. The scope of monitoring consisted of a review of current contracts, budgets, program operating procedures, staffing, inventory control, financial and procurement procedures, review of client files and audit reports, inspection of completed dwelling units and assessment of monitoring, training, and technical assistance provided by the grantees. A random sampling of completed units were selected and visits were made to inspect these weatherized dwellings.

  11. Operational test procedure for SY tank farm replacement exhauster unit

    SciTech Connect (OSTI)

    McClees, J.

    1995-09-26

    This operational test procedure will verify that the remaining functions not tested per WHC-SD-WM-ATP-080, or components disturbed during final installation, as well as interfaces with other tank farm equipment and remote monitoring stations are operating correctly.

  12. Final Project Report

    SciTech Connect (OSTI)

    Wang, Qiang; Dandy, David S.

    2015-05-15

    This is the final technical report of the DOE project DE-FG02-07ER46448 awarded to Colorado State University.

  13. " Million Housing Units, Final...

    U.S. Energy Information Administration (EIA) Indexed Site

    Characteristics of U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" "Structural and ...

  14. National Science Bowl Finals

    ScienceCinema (OSTI)

    None

    2010-09-01

    National Science Bowl finals and awards at the National Building Museum in Washington D.C. Monday 5/3/2010

  15. DOE Final Report

    SciTech Connect (OSTI)

    Hinzman, Larry D.; Long, James; Newby, Greg B.

    2014-01-08

    This final report contains a summary of work accomplished in the establishment of a Climate Data Center at the International Arctic Research Center, University of Alaska Fairbanks.

  16. Environmental Restoration Quality Program Implementation Plan. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1992-08-01

    The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

  17. Project Analysis Standard Operating Procedure

    Office of Environmental Management (EM)

    Standard Operating Procedure (EPASOP) Issued by Office of Acquisition and Project Management MA-63 March 12, 2014 DEPARTMENT OF ENERGY Office of Acquisition and Project...

  18. IPv6 Implementation Checklist

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IPv6 Implementation Checklist Engineering Services The Network OSCARS Fasterdata IPv6 Network IPv6 Implementation Checklist ESnet IPv6 Mirror Servers ESnet IPv6 History ESnet supports Sandia and APNIC IPv6 Background Radiation research Network Performance Tools The ESnet Engineering Team Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site Feedback:

  19. Environmental protection implementation plan

    SciTech Connect (OSTI)

    Holland, R.C.

    1998-03-01

    This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. SNL is committed to operating in full compliance with the letter and spirit of applicable environmental laws, regulations, and standards. Furthermore, SNL/California strives to go beyond compliance with legal requirements by making every effort practical to reduce impacts to the environment to levels as low as reasonably achievable.

  20. Federal Agency NEPA Procedures | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Agency NEPA Procedures Federal Agency NEPA Procedures Each Federal agency is required to develop NEPA procedures that supplement the CEQ Regulations. Developed in...

  1. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix O: Economic and Social Impact.

    SciTech Connect (OSTI)

    Columbia River System Operation Review

    1995-11-01

    This Appendix O of the Final Environmental Impact Statement for the Columbia River System measures the economic and social effects of the alternative system operation strategies and includes both geographic and methodology components. Areas discussed in detail include the following: purpose, scope and process; an economic history of the Columbia River Basin and its use today including the Columbia River and Socio-economic development in the Northwest and Major uses of the River System; Analysis procedures and methodologies including national economic evaluation, the concepts, analysis of assumptions, analysis for specific river uses, water quality, Regional evaluation, analysis, and social impacts; alternatives and impacts including implementation costs, andromous fish, resident fish and wildlife, flood control, irrigation and municipal and industrial water supply, navigation impacts, power, recreation, annual costs, regional economic analysis. Extensive comparison of alternatives is included.

  2. Transition Implementation Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-04-24

    This Guide was prepared to aid in the development, planning, and implementation of requirements and activities during the transition phase at Department of Energy (DOE) facilities that have been declared or are forecast to become excess to any future mission requirements.

  3. Plans, Implementation, and Results

    Broader source: Energy.gov [DOE]

    The Bioenergy Technologies Office carries out technology research, development, and deployment through an ongoing process of planning and analysis, implementation, and review. This Web page includes links to documents that support and document the program management process, and the results and public benefits that derive from it.

  4. External Independent Review (EIR) Standard Operating Procedure...

    Broader source: Energy.gov (indexed) [DOE]

    External Independent Review (EIR) Standard Operating Procedure (SOP) - September 2010 More Documents & Publications External Independent Review (EIR) Standard Operating Procedure...

  5. Quality Procedure - Document Control | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Control Quality Procedure - Document Control This procedure establishes the responsibilities and process for preparing, managing, and revising EM Headquarters Office of Standards and Quality Assurance controlled documents in accordance with EM-QA-001, Environmental Management Quality Assurance Program. Quality Procedure - Document Control (2.6 MB) More Documents & Publications Quality Procedure - Supplier Qualification Quality Procedure - Approved Suppliers List Quality Procedure - Records

  6. Executive Order 13423 Implementing Instructions

    Broader source: Energy.gov [DOE]

    INSTRUCTIONS FOR IMPLEMENTING EXECUTIVE ORDER 13423“Strengthening Federal Environmental, Energy, and Transportation Management”

  7. Comparison of Real World Energy Consumption to Models and Department of Energy Test Procedures

    SciTech Connect (OSTI)

    Goetzler, William; Sutherland, Timothy; Kar, Rahul; Foley, Kevin

    2011-09-01

    This study investigated the real-world energy performance of appliances and equipment as it compared with models and test procedures. The study looked to determine whether the U.S. Department of Energy and industry test procedures actually replicate real world conditions, whether performance degrades over time, and whether installation patterns and procedures differ from the ideal procedures. The study first identified and prioritized appliances to be evaluated. Then, the study determined whether real world energy consumption differed substantially from predictions and also assessed whether performance degrades over time. Finally, the study recommended test procedure modifications and areas for future research.

  8. " Million Housing Units, Final...

    U.S. Energy Information Administration (EIA) Indexed Site

    3 Space Heating in U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" ,,"Before 1940","1940 to ...

  9. " Million Housing Units, Final...

    U.S. Energy Information Administration (EIA) Indexed Site

    3 Appliances in U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" ,,"Before 1940","1940 to 1949","1950 ...

  10. CFC Charity Fair Finale

    Broader source: Energy.gov [DOE]

    Finish out the 2012 CFC with the Charity Fair Finale! Buy cookies, participate in a putt-putt golf game, eat some popcorn, and meet and talk with CFC charity representatives.

  11. Final EIS Available

    Broader source: Energy.gov [DOE]

    DOE has published a Final Environmental Impact Statement (EIS) that considers all timely public comments on the Draft EIS and identifies DOE’s preferred project alternative(s). The U.S....

  12. CX-100 Final Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SAND2008-4648 Unlimited Release Printed July 2008 Blade System Design Studies Phase II: Final Project Report Derek S. Berry TPI Composites, Inc. 373 Market Street Warren, RI 02885...

  13. " Million Housing Units, Final...

    U.S. Energy Information Administration (EIA) Indexed Site

    Water Heating in U.S. Homes, by Housing Unit Type, 2009" " Million Housing Units, Final" ... Units","5 or More Units","Mobile Homes" "Water Heating" "Total Homes",113.6,71.8,6.7,9,19...

  14. " Million Housing Units, Final...

    U.S. Energy Information Administration (EIA) Indexed Site

    Water Heating in U.S. Homes, by Census Region, 2009" " Million Housing Units, Final" ,,"Census Region" ,"Total U.S.1 (millions)" ,,"Northeast","Midwest","South","West" "Water ...

  15. " Million Housing Units, Final...

    U.S. Energy Information Administration (EIA) Indexed Site

    6 Water Heating in U.S. Homes, by Climate Region, 2009" " Million Housing Units, Final" ... Cold","Mixed- Humid","Mixed-Dry" "Water Heating",,"Cold",,"Hot-Dry","Hot-Humid","M...

  16. " Million Housing Units, Final...

    U.S. Energy Information Administration (EIA) Indexed Site

    5 Water Heating in U.S. Homes, by Household Income, 2009" " Million Housing Units, Final" ... to 119,999","120,000 or More" "Water Heating" "Total Homes",113.6,23.7,27.5,21....

  17. Aurora final report

    SciTech Connect (OSTI)

    Robert, Dross; Amedeo, Conti

    2013-12-06

    Final Technical report detailing the work done by Nuvera and its partners to fulfill the goals of the program "Transport Studies Enabling Efficiency Optimization of Cost-Competitive Fuel Cell Stacks" (a.k.a. AURORA)

  18. Dynamic procedure for filtered gyrokinetic simulations

    SciTech Connect (OSTI)

    Morel, P.; Banon Navarro, A.; Albrecht-Marc, M.; Carati, D.; Merz, F.; Goerler, T.; Jenko, F.

    2012-01-15

    Large eddy simulations (LES) of gyrokinetic plasma turbulence are investigated as interesting candidates to decrease the computational cost. A dynamic procedure is implemented in the gene code, allowing for dynamic optimization of the free parameters of the LES models (setting the amplitudes of dissipative terms). Employing such LES methods, one recovers the free energy and heat flux spectra obtained from highly resolved direct numerical simulations. Systematic comparisons are performed for different values of the temperature gradient and magnetic shear, parameters which are of prime importance in ion temperature gradient driven turbulence. Moreover, the degree of anisotropy of the problem, which can vary with parameters, can be adapted dynamically by the method that shows gyrokinetic large eddy simulation to be a serious candidate to reduce numerical cost of gyrokinetic solvers.

  19. 29 C.F.R. Part 24: Procedures for the Handling of Retaliation Complaints

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    under Federal Employee Protection Statutes | Department of Energy Part 24: Procedures for the Handling of Retaliation Complaints under Federal Employee Protection Statutes 29 C.F.R. Part 24: Procedures for the Handling of Retaliation Complaints under Federal Employee Protection Statutes Stakeholders: DOE Employees and Employees of DOE Contractors Scope: 29 C.F.R. Part 24 implements procedures under the employee protection provisions for which the Secretary of Labor has been given

  20. Final Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS - 0097-F c f ` f= �c J m s= Final Environmental Impact Statement BONNEVILLE POWER ADMINISTRATION TRANSMISSION FACILITIES VEGETATION MANAGEMENT PROGRAM U.S. Department of Energy August 1983 Appendices albLbfp= J MMVTJc= Responsible Official: tfiif^j= ^K= s^rde^k= Assistant Secretary for Environmental Protection. Safety, and Emergency Prepafedness Final Environmental Impact Statement BONNEVILLE POWER ADM IN ISTRA TION TRANSMISSION FACILITIES VEGETATION MANAGEMENT PROGRAM U.S. Department of

  1. Caspary Thesis Final

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DENSITY AND BETA LIMITS IN THE MADISON SYMMETRIC TORUS REVERSED-FIELD PINCH by KYLE JONATHAN CASPARY A dissertation submitted in partial fulfillment of the requirements for the degree of Doctor of Philosophy (PHYSICS) at the UNIVERSITY OF WISCONSIN-MADISON 2014 Date of final oral examination: March 24th, 2014 The dissertation is under review by the following members of the Final Oral Committee: Brett Chapman, Senior Scientist, Physics John Sarff, Professor, Physics Paul Terry, Professor, Physics

  2. Cathodic protection acceptance test procedure

    SciTech Connect (OSTI)

    Nordquist, E.M.

    1994-09-02

    This acceptance test procedure is to document testing of added anodes to existing Rectifier No. 11. Anodes were added under Project W-151, Tank 101-AZ Waste Retrieval System.

  3. Surface Environmental Surveillance Procedures Manual

    SciTech Connect (OSTI)

    Hanf, RW; Dirkes, RL

    1990-02-01

    This manual establishes the procedures for the collection of environmental samples and the performance of radiation surveys and other field measurements. Responsibilities are defined for those personnel directly involved in the collection of samples and the performance of field measurements.

  4. Forrestal Security and Safety Procedures

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1983-02-02

    To establish uniform procedures for the security and safety of the Forrestal Building and to inform all personnel of precautionary measures. This directive does not cancel another directive. Canceled by DOE N 251.11.

  5. State and Local Code Implementation: Southeast Region - 2014 BTO Peer

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review | Department of Energy Southeast Region - 2014 BTO Peer Review State and Local Code Implementation: Southeast Region - 2014 BTO Peer Review Presenter: Lauren Westmoreland, Southeast Energy Efficiency Alliance View the Presentation State and Local Code Implementation: Southeast Region - 2014 BTO Peer Review (1.24 MB) More Documents & Publications Southeast Energy Efficiency Alliance's Building Energy Codes Project EA-1872: Draft Environmental Assessment EA-1871: Final Environmental

  6. Federal Building Metering Implementation Plan Template | Department...

    Office of Environmental Management (EM)

    Implementation Plan Template Federal Building Metering Implementation Plan Template Document provides a template for a federal building metering implementation plan....

  7. Implementing Advances in Transport Security Technologies | Department...

    Office of Environmental Management (EM)

    Implementing Advances in Transport Security Technologies Implementing Advances in Transport Security Technologies Implementing Advances in Transport Security Technologies More...

  8. Evaluation of Revised Computer-Based Procedure System Prototype

    SciTech Connect (OSTI)

    Katya Le Blanc; Johanna Oxstrand; Cheradan Fikstad

    2013-01-01

    The nuclear power industry is very procedure driven, i.e. almost all activities that take place at a nuclear power plant are conducted by following procedures. The paper-based procedures (PBPs) currently used by the industry do a good job at keeping the industry safe. However, these procedures are most often paired with methods and tools put in place to anticipate, prevent, and catch errors related to hands-on work. These tools are commonly called human performance tools. The drawback with the current implementation of these tools is that the task of performing one procedure becomes time and labor intensive. For example, concurrent and independent verification of procedure steps are required at times, which essentially means that at least two people have to be actively involved in the task. Even though the current use of PBPs and human performance tools are keeping the industry safe, there is room for improvement. The industry could potentially increase their efficiency and safety by replacing their existing PBPs with CBPs. If implemented correctly, the CBP system could reduce the time and focus spent on using the human performance tools. Some of the tools can be completely incorporated in the CBP system in a manner that the performer does not think about the fact that these tools are being used. Examples of these tools are procedure use and adherence, placekeeping, and peer checks. Other tools can be partly integrated in a fashion that reduce the time and labor they require, such as concurrent and independent verification. The incorporation of advanced technology, such as CBP systems, may help to manage the effects of aging systems, structures, and components. The introduction of advanced technology may also make the existing LWR fleet more attractive to the future workforce, which will be of importance when the future workforce will chose between existing fleet and the newly built nuclear power plants.

  9. REM Handling Procedures | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    REM Handling Procedures Below are recommended handling procedures for the Rare Earth Metals. Keep in mind that these procedures are intended for very high purity metals, and alternative procedures may exist or be better suited to your facilities' capabilities. Please consult with your safety officer(s) before employing any of these procedures. The procedures are grouped by element: La, Ce, Pr & Nd Sc, Y, Gd, Tb, Dy, Ho, Er, Tm and Lu Sm & Yb Eu RECOMMENDED HANDLING PROCEDURES FOR: La,

  10. U.S. - Canada Power System Outage Task Force: Final Report on the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Implementation of Task Force Recommendations | Department of Energy - Canada Power System Outage Task Force: Final Report on the Implementation of Task Force Recommendations U.S. - Canada Power System Outage Task Force: Final Report on the Implementation of Task Force Recommendations On August 14, 2003, the largest power blackout in North American history affected an area with an estimated 50 million people and 61,800 megawatts (MW) of electric load in the states of Ohio, Michigan,

  11. Energy Conservation Program for Consumer Products: Test Procedures for Residential Furnaces Fans; Correction

    Office of Energy Efficiency and Renewable Energy (EERE)

    On January 3, 2014 the U.S. Department of Energy (DOE) published a final rule in the Federal Register that established the test procedure for residential furnace fans. Due to drafting errors, that document inadvertently removed necessary incorporation by reference material in the Code of Federal Regulations (CFR). This final rule rectifies this error by once again adding the removed material.

  12. Microsoft Word - Appendix C - Soil Disturbance Evaluation Procedure.docx

    Office of Legacy Management (LM)

    Rocky Flats Site Soil Disturbance Evaluation Procedure This page intentionally left blank U.S. Department of Energy Rocky Flats Site Operations Guide July 2013 Doc. No. S03037-6.0 Page C-1 Soil Disturbance Evaluation Process Purpose: The purpose of this Soil Disturbance Evaluation Process is to identify hazards and regulatory requirements so that appropriate work control steps, including regulatory agency and/or engineering approvals, are implemented to address and mitigate the hazard and/or

  13. Quality Procedure - Supplier Qualification | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Supplier Qualification Quality Procedure - Supplier Qualification This procedure establishes the responsibilities and process for supplier qualification activities conducted by Environmental Management (EM) Headquarters (HQ) Office of Standards and Quality Assurance in accordance with EM-QA-001, Environmental Management Quality Assurance Program. Quality Procedure - Supplier Qualification (2.03 MB) More Documents & Publications Quality Procedure - Approved Suppliers List Quality Procedure -

  14. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  15. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  16. Final Technical Report

    SciTech Connect (OSTI)

    Gilbert, Chris

    2014-11-13

    The project, Capital Investment to Fund Equipment Purchases and Facility Modifications to Create a Sustainable Future for EnergyXchange served to replace landfill gas energy with alternative energy resources, primarily solar and wood waste. This is the final project closeout report.

  17. 2006 Long Range Development Plan Final Environmental ImpactReport

    SciTech Connect (OSTI)

    Philliber, Jeff

    2007-01-22

    This environmental impact report (EIR) has been prepared pursuant to the applicable provisions of the California Environmental Quality Act (CEQA) and its implementing guidelines (CEQA Guidelines), and the Amended University of California Procedures for Implementation of the California Environmental Quality Act (UC CEQA Procedures). The University of California (UC or the University) is the lead agency for this EIR, which examines the overall effects of implementation of the proposed 2006 Long Range Development Plan (LRDP; also referred to herein as the 'project' for purposes of CEQA) for Lawrence Berkeley National Laboratory (LBNL; also referred to as 'Berkeley Lab,' 'the Laboratory,' or 'the Lab' in this document). An LRDP is a land use plan that guides overall development of a site. The Lab serves as a special research campus operated by the University employees, but it is owned and financed by the federal government and as such it is distinct from the UC-owned Berkeley Campus. As a campus operated by the University of California, the Laboratory is required to prepare an EIR for an LRDP when one is prepared or updated pursuant to Public Resources Code Section 21080.09. The adoption of an LRDP does not constitute a commitment to, or final decision to implement, any specific project, construction schedule, or funding priority. Rather, the proposed 2006 LRDP describes an entire development program of approximately 980,000 gross square feet of new research and support space construction and 320,000 gross square feet of demolition of existing facilities, for a total of approximately 660,000 gross square feet of net new occupiable space for the site through 2025. Specific projects will undergo CEQA review at the time proposed to determine what, if any, additional review is necessary prior to approval. As described in Section 1.4.2, below, and in Chapter 3 of this EIR (the Project Description), the size of the project has been reduced since the Notice of Preparation for

  18. Final Report Package_Winnebago

    SciTech Connect (OSTI)

    Carolyn Stewart, Director, Red Mountain Energy Partners

    2006-10-31

    The Winnebago Tribe of Nebraska energy options study results will be used to advance the Tribes near term energy management objectives. The array of energy options identified allows the Tribe to select those activities that best fit its energy strategies, goals and objectives. During the course of the study, Red Mountain analyzed both energy options and energy organizational alternatives suitable for the Tribe, presented findings to the Tribal Council, and made recommendations regarding each. Work products delivered to the Tribe, and provided in the Final Report included: A matrix of energy management options applicable to the Tribe, which provided descriptions of particular conservation, efficiency, weatherization, and demand management alternatives. The matrix also provided insight about relative costs of the alternatives, cost/benefit efficacy, ease of implementation, resources for implementing, and observations about each. A matrix of utility service options applicable to the Tribe, describing each of the four alternatives described above. The matrix also provided insight about key benefits of each option, required resources, costs and timeframe for implementation, funding sources and analysis, and key issues for consideration. Discussion guides prepared for each meeting between the Energy Committee and Council, and the Tribes contractor, Red Mountain Energy Partners, which included preliminary analysis and findings. A Position Description for the Energy Manager position, which was reviewed by the Tribal HR Department, and used by the Tribe to develop a position posting. A Utility Code designed for Winnebago to use in establishing its Utility Board, and, ultimately, to provide guidance for the Boards further development. A project summary book developed to include all key information, deliverables and utility provider data for the project. Winnebagos growth trends and expansion plans require the Tribe to play a more active role in assuring that

  19. Chapter 13 - Simplified Acquisition Procedures | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 - Simplified Acquisition Procedures Chapter 13 - Simplified Acquisition Procedures 13.1 - Purchase Card Policy and Operating Procedures PDF icon 13.2PurchaseOrders0.pdf PDF...

  20. Final Scientific Report

    SciTech Connect (OSTI)

    Suzanne Lutwick; Helen Cunning

    2011-05-25

    Hackensack University Medical Center's major initiative to create a cleaner healthier and safer environment for patients, employees and the community served by the medical center is built on its commitment to protect the environment and conserve precious energy resources. Since 2004 the Medical Center launched a long term campaign to temper the negative environmental impact of proposed and existing new construction at the medical center and to improve campus wide overall energy efficiency. The plan was to begin by implementing a number of innovative and eco-friendly enhancements to the Gabrellian Women's and Children's Pavilion, in construction at the time, which would lead to Certification by the US Green Building Councils Leadership & Environmental Design (LEED) program. In addition the medical center would evaluate the feasibility of implementing a photovoltaic system in the new construction (in development and planned) to provide clean pollution free electricity. The steps taken to achieve this included conducting a feasibility study complete with architectural and engineering assessments to determine the potential for implementation of a photovoltaic system on the campus and also to conduct an energy survey that would focus on determining specific opportunities and upgrades that would lead to a healthier energy efficient interior environment at the medical center. The studies conducted by the medical center to determine the viability of installing a photovoltaic system identified two key issues that factored into leaderships decision not to implement the solar powered system. These factors were related to the advanced phase of construction of the women's and children's pavilion and the financial considerations to redesign and implement in the ambulatory cancer center. The medical center, in spite of their inability to proceed with the solar aspect of the project upheld their commitment to create a healthier environment for the patients and the community. To

  1. Final Technical Report

    SciTech Connect (OSTI)

    Helen Cunning

    2012-05-08

    Hackensack University Medical Center's major initiative to create a cleaner healthier and safer environment for patients, employees and the community served by the medical center is built on its commitment to protect the environment and conserve precious energy resources. Since 2004 the Medical Center launched a long term campaign to temper the negative environmental impact of proposed and existing new construction at the medical center and to improve campus wide overall energy efficiency. The plan was to begin by implementing a number of innovative and eco-friendly enhancements to the Gabrellian Women's and Children's Pavilion, in construction at the time, which would lead to Certification by the US Green Building Councils Leadership & Environmental Design (LEED) program. In addition the medical center would evaluate the feasibility of implementing a photovoltaic system in the new construction (in development and planned) to provide clean pollution free electricity. The steps taken to achieve this included conducting a feasibility study complete with architectural and engineering assessments to determine the potential for implementation of a photovoltaic system on the campus and also to conduct an energy survey that would focus on determining specific opportunities and upgrades that would lead to a healthier energy efficient interior environment at the medical center. The studies conducted by the medical center to determine the viability of installing a photovoltaic system identified two key issues that factored into leaderships decision not to implement the solar powered system. These factors were related to the advanced phase of construction of the women's and children's pavilion and the financial considerations to redesign and implement in the ambulatory cancer center. The medical center, in spite of their inability to proceed with the solar aspect of the project upheld their commitment to create a healthier environment for the patients and the community. To

  2. Upcoming Implementation Date for New Hazard Communication Standard

    Broader source: Energy.gov [DOE]

    The upcoming implementation date for the new Hazard Communication Standard requires all Federal and Contractor employees with hazardous chemicals in their workplace must be in compliance with all modified revisions of this final rule, except: The distributors shall not ship containers labeled by the chemical manufacturer or importer unless it has been modified to comply with paragraph (f)(1) of the Hazard Communication Standard.

  3. Software Verification and Validation Procedure

    SciTech Connect (OSTI)

    Olund, Thomas S.

    2008-09-15

    This Software Verification and Validation procedure provides the action steps for the Tank Waste Information Network System (TWINS) testing process. The primary objective of the testing process is to provide assurance that the software functions as intended, and meets the requirements specified by the client. Verification and validation establish the primary basis for TWINS software product acceptance.

  4. Hazardous Materials Incident Response Procedure

    Broader source: Energy.gov [DOE]

    The purpose of this procedure is to provide guidance for developing an emergency response plan, as outlined in OSHA’s 29 CFR 1910.120(q), for facility response.  This model has been adopted and...

  5. Public Comment Procedures | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Public Comment Procedures Public Comment Procedures In response to an application, any person may file a protest, comments, or a motion to intervene or notice of intervention, as...

  6. External Independent Review (EIR) Standard Operating Procedure...

    Office of Environmental Management (EM)

    Standard Operating Procedure (SOP) May 2016 External Independent Review (EIR) Standard ... The objectives of this EIR Standard Operating Procedure (SOP) document are to clarify EIR ...

  7. External Independent Review (EIR) Standard Operating Procedure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    External Independent Review (EIR) Standard Operating Procedure (SOP) October 2008 External Independent Review (EIR) Standard Operating Procedure (SOP) October 2008 External ...

  8. Export Authorizations - Procedures | Department of Energy

    Energy Savers [EERE]

    Export Authorizations - Procedures Export Authorizations - Procedures Part II, Section 202(e) of the Federal Power Act (FPA) states that exports of electric energy should be...

  9. Standards and Test Procedures | Department of Energy

    Energy Savers [EERE]

    Appliance & Equipment Standards Standards and Test Procedures Standards and Test Procedures The Department of Energy (DOE) establishes energy efficiency standards for certain ...

  10. Procedures and Instructions | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procedure for Conducting a Records Inventory (PDF) Procedure for Preparing a Records Inventory and Disposition Schedule (RIDS) (PDF) InstructionsBrochures Managing Social Media ...

  11. Specifications and Test Procedures | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Specifications and Test Procedures Grid interoperability requires a complex set of interactions defined by specifications and proven through standardized test procedures. Grid...

  12. External Independent Review (EIR) Standard Operating Procedure...

    Broader source: Energy.gov (indexed) [DOE]

    The objectives of this EIR Standard Operating Procedure (SOP) document are to clarify EIR ... PDF icon External Independent Review (EIR) Standard Operating Procedure (SOP), Revision 3, ...

  13. EIS-0203: Programmatic Final Environmental Impact Statement | Department of

    Office of Environmental Management (EM)

    Energy Programmatic Final Environmental Impact Statement EIS-0203: Programmatic Final Environmental Impact Statement Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs This EIS considers programmatic (DOE-wide) alternative approaches to safely, efficiently, and responsibly manage existing and projected quantities of spent nuclear fuel until the year 2035. This amount of time may be required to make and implement a

  14. NGDS Final Report

    SciTech Connect (OSTI)

    Blackman, Harold; Moore, Joseph

    2014-06-30

    The ultimate goal of the National Geothermal Data System (NGDS) is to support the discovery and generation of geothermal sources of energy. The NGDS was designed and has been implemented to provide online access to important geothermal-related data from a network of data providers in order to: • Increase the efficiency of exploration, development and usage of geothermal energy by providing a basis for financial risk analysis of potential sites • Assist state and federal agencies in making land and resource management assessments • Foster the discovery of new geothermal resources by supporting ongoing and future geothermal-related research • Increase public awareness of geothermal energy It is through the implementation of this distributed data system and its subsequent use that substantial increases to the general access and understanding of geothermal related data will result. NGDS provides a mechanism for the sharing of data thereby fostering the discovery of new resources and supporting ongoing geothermal research.

  15. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  16. Distributed generation implementation guidelines

    SciTech Connect (OSTI)

    Guzy, L.; O`Sullivan, J.B.; Jacobs, K.; Major, W.

    1999-11-01

    The overall economics of a distributed generation project is based on cost elements which include: Equipment and financing, fuel, displaced electricity cost, operation and maintenance. Of critical importance is how the facility is managed, including adequate provision for a comprehensive operator training program. Proper equipment maintenance and fuel procurement policy will also lead to greater system availability and optimal system economics. Various utility tariffs are available which may be economically attractive, with an added benefit to the utility of providing a peak shaving resource during peak periods. Changing modes of operation of the distributed generation system may affect staff readiness, require retraining and could affect maintenance costs. The degree of control and oversight that is provided during a project`s implementation and construction phases will impact subsequent maintenance and operating costs. The long term effect of siting impacts, such as building facades that restrict turbine inlet airflow will affect subsequent operations and require supplemental maintenance action. It is possible to site a variety of distributed generation technologies in settings which vary from urban to remote unattended locations with successful results from both an economic and operational perspective.

  17. High Burnup Dry Storage Cask Research and Development Project: Final Test Plan

    Broader source: Energy.gov [DOE]

    This Test Plan for the High Burnup Dry Storage Research Project (HDRP) outlines the data to be collected, the high burnup fuel to be included, and the storage system design, procedures, and licensing necessary for implementation.

  18. Final Technical Report

    SciTech Connect (OSTI)

    Maxwell, Mike, J., P.E.

    2012-08-30

    The STI product is the Final Technical Report from ReliOn, Inc. for contract award DE-EE0000487: Recovery Act PEM Fuel Cell Systems Providing Emergency Reserve and Backup Power. The program covered the turnkey deployment of 431 ReliOn fuel cell systems at 189 individual sites for AT&T and PG&E with ReliOn functioning as the primary equipment supplier and the project manager. The Final Technical Report provides an executive level summary, a comparison of the actual accomplishments vs. the goals and objectives of the project, as well as a summary of the project activity from the contract award date of August 1, 2009 through the contract expiration date of December 31, 2011. Two photos are included in the body of the report which show hydrogen storage and bulk hydrogen refueling technologies developed as a result of this program.

  19. Implementing Strategies for Drying and Pressing Wood Without Emissions Controls

    SciTech Connect (OSTI)

    Sujit Banerjee; Terrance Conners

    2007-09-07

    Drying and pressing wood for the manufacture of lumber, particleboard, oriented strand board (OSB), veneer and medium density fiberboard (MDF) release volatile organic compounds (VOCs) into the atmosphere. These emissions require control equipment that are capital-intensive and consume significant quantities of natural gas and electricity. The objective of our work was to understand the mechanisms through which volatile organic compounds are generated and released and to develop simple control strategies. Of the several strategies developed, two have been implemented for OSB manufacture over the course of this study. First, it was found that increasing final wood moisture by about 2-4 percentage points reduced the dryer emissions of hazardous air pollutants by over 70%. As wood dries, the escaping water evaporatively cools the wood. This cooling tapers off wood when the wood is nearly dry and the wood temperature rises. Thermal breakdown of the wood tissue occurs and VOCs are released. Raising the final wood moisture by only a few percentage points minimizes the temperature rise and reduces emissions. Evaporative cooling also impacts has implications for VOC release from wood fines. Flaking wood for OSB manufacture inevitable generates fines. Fines dry out rapidly because of their high surface area and evaporative cooling is lost more rapidly than for flakes. As a result, fines emit a disproportionate quantity of VOCs. Fines can be reduced in two ways: through screening of the green furnish and through reducing their generation during flaking. The second approach is preferable because it also increased wood yield. A procedure to do this by matching the sharpness angle of the flaker knife to the ambient temperature was also developed. Other findings of practical interests are as follows: Dielectric heating of wood under low-headspace conditions removes terpenes and other extractives from softwood; The monoterpene content in trees depend upon temperature and seasonal

  20. Final Scientific/Technical Report

    SciTech Connect (OSTI)

    Troxell, W; Batchelor, A

    2012-11-28

    Final report for the formation of faculty and education establishing Colorado State's Smart Grid Integration Center

  1. Revised Final DOE10-7-13

    SciTech Connect (OSTI)

    Gilbreath, Bob; Maples, Manuel G

    2013-10-07

    The project goal was reduction of energy consumption on a group of multi-use buildings. The initial step was to assess the group of buildings and define a set of Energy Conservation Measures (ECM?s) that would return an average energy consumption savings of thirty percent. The assessments defined deficiencies in systems from building envelope to interior lighting. Corrections for the deficiencies were addressed through ECM?s that included: high efficiency lighting, occupancy sensors, programmable thermostats, HVAC upgrades, insulation upgrades, as well as a solar thermal installation to reduce propane consumption. ECM?s were recommended based on calculated energy savings. ECM implementation was performed using licensed professionals across multiple disciplines. Electricians installed new lighting and set up occupancy sensors while plumbers implemented low flow fixtures and insulated water heater systems. A general contractor sealed and repaired building envelopes while overseeing other disciplines. Final energy consumption reductions will exceed thirty percent across nine buildings

  2. Implementation of CAA amendments: The federal perspective

    SciTech Connect (OSTI)

    Nichols, M.

    1995-12-01

    The Clean Air Act Amendments of 1990 established a rigorous timetable for EPA to develop and implement an unprecedented number of regulatory and policy initiatives. EPA has made great progress in meeting these mandates; however, much remains to be done if the Act`s health and environmental goals are to be achieved. EPA must issue dozens of additional regulations, guidance documents, and studies and reports over the next several years. The largest group of remaining rulemakings will be those controlling air toxics emissions. Other significant actions will include final rulemakings on emission standards for non-road engines, emissions standards for municipal and medical waste combustion, enhanced emissions monitoring, Federal operating permits, and newsource review simplification. EPA also must accelerate and expand a host of activities to ensure that the Agency and the States are implementing and enforcing the Act effectively. For example, EPA must assess hundreds of SIP revisions, as well as 120 State and local permit programs, and provide technical assistance to States and sources. Ms. Nichols will present EPA`s will present EPA`s plans for implementing these activities over the next several years. She will present a summary of the Agency`s current achievements under the 1990 amendments and EPA`s framework for completing the challenging tasks that lie ahead.

  3. PSM`s most common struggle: Implementing mechanical integrity

    SciTech Connect (OSTI)

    Remson, A.C.; Farmer, J.H.; King, S.C. [JBF Associates, Inc., Knoxville, TN (United States)] [JBF Associates, Inc., Knoxville, TN (United States)

    1995-10-01

    Most companies have found that of the 14 OSHA PSM elements, Mechanical Integrity (MI) presents the greatest implementation challenge. Although maintenance departments have successfully installed, repaired, and replaced plant equipment for decades, many of these same maintenance departments have struggled with OSHA`s PSM requirements. One major challenge is prioritizing resources. Opportunities to improve will always exist; however, it is often difficult to effectively allocate money and manpower. Another challenge is simply getting organized. The MI program should be supported by appropriate, useful procedures; but given the multifaceted and ever-changing nature of maintenance, what procedures should be written? How detailed should be procedures be? With nearly 3 years of PSM enforcement complete, an analysis of OSHA`s MI citation helps to provide insight to these challenges. This paper presents ideas for implementing MI in a manner that meets OSHA`s expectations while contributing to safe, effective maintenance in PSM-covered processes. In particular, the paper presents ideas for developing MI programs that effectively prioritize company resources, with appropriate inspection/test/preventive maintenance and quality assurance (QA) activities. This paper also presents ideas for developing a list of mechanical integrity procedures to address OSHA`s requirements as well as the type of information to include in those procedures. 10 refs., 3 tabs.

  4. Life Cycle Cost (LCC) Handbook Final Version 9-30-14

    Broader source: Energy.gov [DOE]

    This handbook provides procedures, information, examples, and tools to develop consistent and defensible life-cycle cost estimates (LCCE) and perform appropriate life-cycle cost analyses (LCCA) for capital projects. LCC Handbook – Final, September 2014

  5. Surface Environmental Surveillance Procedures Manual

    SciTech Connect (OSTI)

    RW Hanf; TM Poston

    2000-09-20

    Environmental surveillance data are used in assessing the impact of current and past site operations on human health and the environment, demonstrating compliance with applicable local, state, and federal environmental regulations, and verifying the adequacy of containment and effluent controls. SESP sampling schedules are reviewed, revised, and published each calendar year in the Hanford Site Environmental Surveillance Master Sampling Schedule. Environmental samples are collected by SESP staff in accordance with the approved sample collection procedures documented in this manual.

  6. Biomass Compositional Analysis Laboratory Procedures | Bioenergy | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Biomass Compositional Analysis Laboratory Procedures NREL develops laboratory analytical procedures (LAPs) for standard biomass analysis. These procedures help scientists and analysts understand more about the chemical composition of raw biomass feedstocks and process intermediates for conversion to biofuels. View Publications Subscribe to email updates about revisions and additions to biomass analysis procedures, FAQs, calculation spreadsheets, and publications. Email: Subscribe Unsubscribe

  7. HSE12 implementation in libxc

    Energy Science and Technology Software Center (OSTI)

    2013-05-13

    This piece of software is a new feature implemented inside an existing open-source library. Specifically, it is a new implementation of a density functional (HSE, short for Heyd-Scuseria-Ernzerhof) for a repository of density functionals, the libxc library. It fixes some numerical problems with existing implementations, as outlined in a scientific paper recently submitted for publication. Density functionals are components of electronic structure simulations, which model properties of electrons inside molecules and crystals.

  8. Conduct of operations implementation plan

    SciTech Connect (OSTI)

    Anderson, C.K.; Hall, R.L.

    1991-02-20

    This implementation plan describes the process and provides information and schedules that are necessary to implement and comply with the Department of Energy (DOE) Order 5480.19, {open_quotes}Conduct of Operations{close_quotes} (CoOp). This plan applies to all Pinellas Plant operations and personnel. Generally, this Plan discusses how DOE Order 5480.19 will be implemented at the Pinellas Plant.

  9. Launch implementation | Open Energy Information

    Open Energy Info (EERE)

    Launch implementation Jump to: navigation, search Stage 4 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities DevelopBAU Stage 4:...

  10. Implementation Standing Technical Committee Presentation

    Broader source: Energy.gov [DOE]

    This presentation outlines the goals of the Implementation Standing Technical Committee, as presented at the Building America Spring 2012 Stakeholder meeting on February 29, 2012, in Austin, Texas.

  11. Financing Program Implementation Process Flow

    Broader source: Energy.gov [DOE]

    The implementation process flow for financing with two models: a generic option for primary markets and a conceptual option for secondary markets.

  12. CASL - Implementing Integrated Steam Tables

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    implementation, and interpolation package codes have been approved for release as open source software. They will be made available in future for download at http:...

  13. Final Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement Volume1

    SciTech Connect (OSTI)

    Not Available

    2011-01-01

    Pursuant to the Mercury Export Ban Act of 2008 (P.L. 110-414), DOE was directed to designate a facility or facilities for the long-term management and storage of elemental mercury generated within the United States. Therefore, DOE has analyzed the storage of up to 10,000 metric tons (11,000 tons) of elemental mercury in a facility(ies) constructed and operated in accordance with the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (74 FR 31723).DOE prepared this Final Mercury Storage EIS in accordance with the National Environmental Policy Act of 1969 (NEPA), as amended (42 U.S.C. 4321 et seq.), the Council on Environmental Quality (CEQ) implementing regulations (40 CFR 1500–1508), and DOE’s NEPA implementing procedures (10 CFR 1021) to evaluate reasonable alternatives for a facility(ies) for the long-term management and storage of elemental mercury. This Final Mercury Storage EIS analyzes the potential environmental, human health, and socioeconomic impacts of elemental mercury storage at seven candidate locations:Grand Junction Disposal Site near Grand Junction, Colorado; Hanford Site near Richland, Washington; Hawthorne Army Depot near Hawthorne, Nevada; Idaho National Laboratory near Idaho Falls, Idaho;Kansas City Plant in Kansas City, Missouri; Savannah River Site near Aiken, South Carolina; and Waste Control Specialists, LLC, site near Andrews, Texas. As required by CEQ NEPA regulations, the No Action Alternative was also analyzed as a basis for comparison. DOE intends to decide (1) where to locate the elemental mercury storage facility(ies) and (2) whether to use existing buildings, new buildings, or a combination of existing and new buildings. DOE’s Preferred Alternative for the long-term management and storage of mercury is the Waste Control Specialists, LLC, site near Andrews, Texas.

  14. Final Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement Volume 2

    SciTech Connect (OSTI)

    Not Available

    2011-01-01

    Pursuant to the Mercury Export Ban Act of 2008 (P.L. 110-414), DOE was directed to designate a facility or facilities for the long-term management and storage of elemental mercury generated within the United States. Therefore, DOE has analyzed the storage of up to 10,000 metric tons (11,000 tons) of elemental mercury in a facility(ies) constructed and operated in accordance with the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (74 FR 31723). DOE prepared this Final Mercury Storage EIS in accordance with the National Environmental Policy Act of 1969 (NEPA), as amended (42 U.S.C. 4321 et seq.), the Council on Environmental Quality (CEQ) implementing regulations (40 CFR 1500–1508), and DOE’s NEPA implementing procedures (10 CFR 1021) to evaluate reasonable alternatives for a facility(ies) for the long-term management and storage of elemental mercury. This Final Mercury Storage EIS analyzes the potential environmental, human health, and socioeconomic impacts of elemental mercury storage at seven candidate locations: Grand Junction Disposal Site near Grand Junction, Colorado; Hanford Site near Richland, Washington; Hawthorne Army Depot near Hawthorne, Nevada; Idaho National Laboratory near Idaho Falls, Idaho; Kansas City Plant in Kansas City, Missouri; Savannah River Site near Aiken, South Carolina; and Waste Control Specialists, LLC, site near Andrews, Texas. As required by CEQ NEPA regulations, the No Action Alternative was also analyzed as a basis for comparison. DOE intends to decide (1) where to locate the elemental mercury storage facility(ies) and (2) whether to use existing buildings, new buildings, or a combination of existing and new buildings. DOE’s Preferred Alternative for the long-term management and storage of mercury is the Waste Control Specialists, LLC, site near Andrews, Texas.

  15. Clean Fleet Final Report

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    2 P r o j e c t D e s i g n a n d I m p l e m e n t a t i o n FINAL REPORT December 1995 December 1995 This information was prepared by Battelle Memorial Institute, Columbus Operations, through sponsorship by various companies and associations, the South Coast Air Quality Management District (District), and the California Energy Commission (Commission). Battelle has endeavored to produce a high quality study consistent with its contract commitments. However, because of the research and/or

  16. Clean Fleet Final Report

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    3 V e h i c l e M a i n t e n a n c e a n d D u r a b i l i t y FINAL REPORT December 1995 December 1995 December 1995 This information was prepared by Battelle Memorial Institute, Columbus Operations, through sponsor- ship by various companies and associations, the South Coast Air Quality Management District (District), and the California Energy Commission (Commission). Battelle has endeavored to produce a high quality study consistent with its contract commitments. However, because of the

  17. Final Technical Report

    SciTech Connect (OSTI)

    Sobecky, Patricia A; Taillefert, Martial

    2013-03-29

    This final technical report describes results and findings from a research project to examine the role of microbial phosphohydrolase enzymes in naturally occurring subsurface microorganisms for the purpose of promoting the immobilization of the radionuclide uranium through the production of insoluble uranium phosphate minerals. The research project investigated the microbial mechanisms and the physical and chemical processes promoting uranium biomineralization and sequestration in oxygenated subsurface soils. Uranium biomineralization under aerobic conditions can provide a secondary biobarrier strategy to immobilize radionuclides should the metal precipitates formed by microbial dissimilatory mechanisms remobilize due to a change in redox state.

  18. Microsoft Word - Final Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 Assessment of the Performance of COBRA-TF for the Prediction of Subcooled Boiling Conditions in Rod Bundles Dr. J. Michael Doster NCSU September 30, 2013 CASL-8-2013-0201-000 Final Report L3.THM.CFD.P7.07 Dr. J. Michael Doster Nuclear Engineering Department North Carolina State University Assessment of the Performance of COBRA-TF for the Prediction of Subcooled Boiling Conditions in Rod Bundles September 30, 2013 CASL-U-2013-0201-000 INTRODUCTION An assessment has been performed of the

  19. A manual for implementing residual radioactive material guidelines

    SciTech Connect (OSTI)

    Gilbert, T.L.; Yu, C.; Yuan, Y.C.; Zielen, A.J.; Jusko, M.J.; Wallo, A. III

    1989-06-01

    This manual presents information for implementing US Department of Energy (DOE) guidelines for residual radioactive material at sites identified by the Formerly Utilized Sites Remedial Action Program (FUSRAP) and the Surplus Facilities Management Program (SFMP). It describes the analysis and models used to derive site-specific guidelines for allowable residual concentrations of radionuclides in soil and the design and use of the RESRAD computer code for calculating guideline values. It also describes procedures for implementing DOE policy for reducing residual radioactivity to levels that are as low as reasonably achievable. 36 refs., 16 figs, 22 tabs.

  20. Decision making, procedural compliance, and outcomes definition in U.S. forest service planning processes

    SciTech Connect (OSTI)

    Stern, Marc J.; Predmore, S. Andrew

    2011-04-15

    The National Environmental Policy Act (NEPA) dictates a process of analyzing and disclosing the likely impacts of proposed agency actions on the human environment. This study addresses two key questions related to NEPA implementation in the U.S. Forest Service: 1) how do Interdisciplinary (ID) team leaders and decision makers conceptualize the outcomes of NEPA processes? And 2), how does NEPA relate to agency decision making? We address these questions through two separate online surveys that posed questions about recently completed NEPA processes - the first with the ID team leaders tasked with carrying out the processes, and the second with the line officers responsible for making the processes' final decisions. Outcomes of NEPA processes include impacts on public relations, on employee morale and team functioning, on the achievement of agency goals, and on the achievement of NEPA's procedural requirements (disclosure) and substantive intent (minimizing negative environmental impacts). Although both tended to view public relations outcomes as important, decision makers' perceptions of favorable outcomes were more closely linked to the achievement of agency goals and process efficiency than was the case for ID team leaders. While ID team leaders' responses suggest that they see decision making closely integrated with the NEPA process, decision makers more commonly decoupled decision making from the NEPA process. These findings suggest a philosophical difference between ID team leaders and decision makers that may pose challenges for both the implementation and the evaluation of agency NEPA. We discuss the pros and cons of integrating NEPA with decision making or separating the two. We conclude that detaching NEPA from decision making poses greater risks than integrating them.

  1. Commercial Vehicle Safety Alliance (CVSA)/Department of Energy (DOE) cooperative agreement final report

    SciTech Connect (OSTI)

    Slavich, Antoinette; Daust, James E.

    1999-10-01

    This S and T product is a culmination of the activities, including research of the Commercial Vehicle Safety Alliance (CVSA) in developing and implementing inspection procedures and the out-of-service criteria for states and tribes to use when inspecting HRCQ and Transuranic shipments of radioactive materials. The report also contains the results of a pilot study to test the procedures.

  2. Current Test Procedure Waivers | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Current Test Procedure Waivers Current Test Procedure Waivers The U.S. Department of Energy's (DOE) regulations for covered products permit a person to seek a waiver, or an interim waiver, from the test procedure requirements for covered appliances and commercial equipment if certain criteria are satisfied. Regulations applicable to test procedure waivers for appliances can be found at 10 CFR 430.27; those applicable to test procedure waivers for commercial equipment are at 10 CFR 431.401. This

  3. Forrestal Garage Parking Procedures | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Forrestal Garage Parking Procedures Forrestal Garage Parking Procedures Forrestal Garage Parking Procedures - The Forrestal Facility Parking Guide was created to define policies and procedures governing the assignment, use, and management of parking spaces controlled by the Department of Energy (DOE) in the Forrestal facility in Washington, DC. This guide applies to DOE Federal employees, including National Nuclear Security Administration (NNSA) Federal employees. These procedures were last

  4. Procedures and Instructions | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management » Procedures and Instructions Procedures and Instructions keyboard-886462_960_720.jpg Records Management Processes Procedure for Conducting a Records Inventory (PDF) Procedure for Preparing a Records Inventory and Disposition Schedule (RIDS) (PDF) Instructions/Brochures Managing Social Media Records (PDF) Procedures for Departing Employees (PDF) Reminder for Senior Officials (PDF) Your Records Responsibility Pamphlet (PDF) Vital Records Pamphlet (PDF) Records Management Assessment

  5. Identifying Non-Federal Cooperating Agencies in Implementing the Procedural Requirements of NEPA (CEQ, 2000)

    Broader source: Energy.gov [DOE]

    The purpose of this Council on Environmental Quality Memorandum is to ensure that all federal and non-federal cooperating agencies are identified on the cover sheet of each Environmental Impact Statement (EIS) prepared by your agency.

  6. Cooperating Agencies in Implementing the Procedural Requirements of the National Environmental Policy Act (CEQ, 2002)

    Broader source: Energy.gov [DOE]

    The purpose of this Council on Environmental Quality Memorandum is to ensure that all Federal agencies are actively considering the designation of Federal and non-federal cooperating agencies in the preparation of analyses and documentation required by the National Environmental Policy Act (NEPA), and to ensure that Federal agencies actively participate as cooperating agencies in other agency’s NEPA processes.

  7. Reporting Cooperating Agencies in Implementing the Procedural Requirements of the National Environmental Policy Act (CEQ, 2004)

    Broader source: Energy.gov [DOE]

    The purpose of this Council on Environmental Quality Memorandum is to establish a revised report to ensure that all Federal agencies are consistently reporting designation of Federal and non-federal cooperating agencies in the preparation of analyses and documentation required by the National Environmental Policy Act (NEPA).

  8. Reference Manual and Procedures for Implementation of PURPA Standards in EISA 2007

    Broader source: Energy.gov [DOE]

    This reference manual is intended to be used as an aid to state commissions and utilities as they consider the new federal standards that are part of the Energy Independence and Security Act of...

  9. Standard review plan on antitrust reviews. Final report

    SciTech Connect (OSTI)

    Lambe, W.M.; Davis, M.J.

    1997-12-01

    This standard review plan describes the procedures used by NRC staff to implement the antitrust review and enforcement provisions in Sections 105 and 186 of the Atomic Energy Act of 1954, as amended (the Act), and replaces NUREG-0970. These procedures are principally derived from the Commission`s Rules and Regulations in 10 CFR Sections 2.101, 2.102, Part 2-Appendix A, Section X, 50.33a, 50.80, 50.90, and 52.77. These procedures set forth the steps and criteria the staff uses in antitrust reviews of construction permit applications, operating license applications, combined construction permit/operating license applications, combined construction permit/operating license applications, and applications for approval of the transfer of construction permits, operating licenses, and combined licenses. In addition, the procedures describe how the staff enforces compliance with antitrust conditions appended to licenses.

  10. EA-1393: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Implementation of a Comprehensive Management Program for the Storage, Transportation, and Disposition of Potentially Reusable Uranium Materials

  11. CONSIDERATIONS FOR THE TREATMENT OF COMPUTERIZED PROCEDURES IN HUMAN RELIABILITY ANALYSIS

    SciTech Connect (OSTI)

    Ronald L. Boring; David I. Gertman

    2012-07-01

    Computerized procedures (CPs) are an emerging technology within nuclear power plant control rooms. While CPs have been implemented internationally in advanced control rooms, to date no US nuclear power plant has implemented CPs in its main control room. Yet, CPs are a reality of new plant builds and are an area of considerable interest to existing plants, which see advantages in terms of easier records management by omitting the need for updating hardcopy procedures. The overall intent of this paper is to provide a characterization of human reliability analysis (HRA) issues for computerized procedures. It is beyond the scope of this document to propose a new HRA approach or to recommend specific methods or refinements to those methods. Rather, this paper serves as a review of current HRA as it may be used for the analysis and review of computerized procedures.

  12. HUMAN RELIABILITY ANALYSIS FOR COMPUTERIZED PROCEDURES, PART TWO: APPLICABILITY OF CURRENT METHODS

    SciTech Connect (OSTI)

    Ronald L. Boring; David I. Gertman

    2012-10-01

    Computerized procedures (CPs) are an emerging technology within nuclear power plant control rooms. While CPs have been implemented internationally in advanced control rooms, to date no U.S. nuclear power plant has implemented CPs in its main control room. Yet, CPs are a reality of new plant builds and are an area of considerable interest to existing plants, which see advantages in terms of easier records management by omitting the need for updating hardcopy procedures. The overall intent of this paper is to provide a characterization of human reliability analysis (HRA) issues for computerized procedures. It is beyond the scope of this document to propose a new HRA approach or to recommend specific methods or refinements to those methods. Rather, this paper serves as a review of current HRA as it may be used for the analysis and review of computerized procedures.

  13. Relevance of Generation Interconnection Procedures to Feed-in Tariffs in the United States

    SciTech Connect (OSTI)

    Fink, S.; Porter, K.; Rogers, J.

    2010-10-01

    Feed-in tariffs (FITs) have been used to promote renewable electricity development in over 40 countries throughout the past two decades. These policies generally provide guaranteed prices for the full system output from eligible generators for a fixed time period (typically 15-20 years). Due in part to the success of FIT policies in Europe, some jurisdictions in the United States are considering implementing similar policies, and a few have already put such policies in place. This report is intended to offer some guidance to policymakers and regulators on how generator interconnection procedures may affect the implementation of FITs and how state generator interconnection procedures can be formulated to support state renewable energy objectives. This report is based on a literature review of model interconnection procedures formulated by several organizations, as well as other documents that have reviewed, commented on, and in some cases, ranked state interconnection procedures.

  14. The Relevance of Generation Interconnection Procedures to Feed-in Tariffs in the United States

    SciTech Connect (OSTI)

    Fink, Sari; Porter, Kevin; Rogers, Jennifer

    2010-10-01

    Feed-in tariffs (FITs) have been used to promote renewable electricity development in over 40 countries throughout the past two decades. These policies generally provide guaranteed prices for the full system output from eligible generators for a fixed time period (typically 15–20 years). Due in part to the success of FIT policies in Europe, some jurisdictions in the United States are considering implementing similar policies, and a few have already put such policies in place. This report is intended to offer some guidance to policymakers and regulators on how generator interconnection procedures may affect the implementation of FITs and how state generator interconnection procedures can be formulated to support state renewable energy objectives. This report is based on a literature review of model interconnection procedures formulated by several organizations, as well as other documents that have reviewed, commented on, and in some cases, ranked state interconnection procedures.

  15. Final Technical Report

    SciTech Connect (OSTI)

    D. Paul Mehta

    2006-09-01

    The Industrial Assessment Center at Bradley University (BU IAC) has been successful in promoting the wise use of energy resources, reduction of environmental waste and increased productivity in the industrial sector. Over 1100 assessment recommendations have been made to 94 industrial clients from September 1, 2002 to August 31, 2006. The projected savings from these recommendations exceeded $15.5 million of which just under $10 million or 62% were implemented. In addition to this over 50 students have been trained to idientify opportunities to reduce costs in induatrial facilities. Many of these students have gone on to careers where they influence the costs of manufacturing thus multiplying the efforts of the center. The details of how this was accomplished is contained in the report which follows.

  16. Audit Implementation Design Plan | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Audit Implementation Design Plan Document Number: NA Effective Date: 08

  17. NTSF Spring 2010 Final Agenda

    Broader source: Energy.gov [DOE]

    Final Agenda for the U.S. Department of Energy's National Transportation Stakeholder Forum taking place in Chicago, Illinois.

  18. Final Scientific EFNUDAT Workshop

    ScienceCinema (OSTI)

    None

    2011-10-06

    The Final Scientific EFNUDAT Workshop - organized by the CERN/EN-STI group on behalf of n_TOF Collaboration - will be held at CERN, Geneva (Switzerland) from 30 August to 2 September 2010 inclusive.EFNUDAT website: http://www.efnudat.euTopics of interest include: Data evaluationCross section measurementsExperimental techniquesUncertainties and covariancesFission propertiesCurrent and future facilities  International Advisory Committee: C. Barreau (CENBG, France)T. Belgya (IKI KFKI, Hungary)E. Gonzalez (CIEMAT, Spain)F. Gunsing (CEA, France)F.-J. Hambsch (IRMM, Belgium)A. Junghans (FZD, Germany)R. Nolte (PTB, Germany)S. Pomp (TSL UU, Sweden) Workshop Organizing Committee: Enrico Chiaveri (Chairman)Marco CalvianiSamuel AndriamonjeEric BerthoumieuxCarlos GuerreroRoberto LositoVasilis Vlachoudis Workshop Assistant: Géraldine Jean

  19. Final Scientific EFNUDAT Workshop

    ScienceCinema (OSTI)

    None

    2011-10-06

    The Final Scientific EFNUDAT Workshop - organized by the CERN/EN-STI group on behalf of n_TOF Collaboration - will be held at CERN, Geneva (Switzerland) from 30 August to 2 September 2010 inclusive.EFNUDAT website: http://www.efnudat.euTopics of interest include: Data evaluationCross section measurementsExperimental techniquesUncertainties and covariancesFission propertiesCurrent and future facilitiesInternational Advisory Committee: C. Barreau (CENBG, France)T. Belgya (IKI KFKI, Hungary)E. Gonzalez (CIEMAT, Spain)F. Gunsing (CEA, France)F.-J. Hambsch (IRMM, Belgium)A. Junghans (FZD, Germany)R. Nolte (PTB, Germany)S. Pomp (TSL UU, Sweden)Workshop Organizing Committee: Enrico Chiaveri (Chairman)Marco CalvianiSamuel AndriamonjeEric BerthoumieuxCarlos GuerreroRoberto LositoVasilis VlachoudisWorkshop Assistant: Graldine Jean

  20. Final Progress Report

    SciTech Connect (OSTI)

    Josef Michl

    2011-10-31

    In this project we have established guidelines for the design on organic chromophores suitable for producing high triplet yields via singlet fission. We have proven their utility by identifying a chromophore of a structural class that had never been examined for singlet fission before, 1,3-diphenylisobenzofuran, and demonstrating in two independent ways that a thin layer of this material produces a triplet yield of 200% within experimental error. We have also designed a second chromophore of a very different type, again of a structural class that had not been examined for singlet fission before, and found that in a thin layer it produces a 70% triplet yield. Finally, we have enhanced the theoretical understanding of the quantum mechanical nature of the singlet fission process.

  1. FINAL/ SCIENTIFIC TECHNICAL REPORT

    SciTech Connect (OSTI)

    McDonald, Henry; Singh, Suminderpal

    2006-08-28

    The overall objective of the Chattanooga fuel cell demonstrations project was to develop and demonstrate a prototype 5-kW grid-parallel, solid oxide fuel cell (SOFC) system that co-produces hydrogen, based on Ion Americas technology. The commercial viability of the 5kW SOFC system was tested by transporting, installing and commissioning the SOFC system at the Alternative Energy Laboratory at the University of Tennessee Chattanooga. The system also demonstrated the efficiency and the reliability of the system running on natural gas. This project successfully contributed to the achievement of DOE technology validation milestones from the Technology Validation section of the Hydrogen, Fuel Cells and Infrastructure Technologies Program Multi-Year Research, Development and Demonstration Plan. Results of the project can be found in the final technical report.

  2. Implementation of subsidence control regulatory requirements

    SciTech Connect (OSTI)

    Barkley, D.

    1999-07-01

    Underground coal mining in Illinois has shown an increasing percentage of total coal mined relative to surface mining. In the past 20 years, the percentage of underground to surface mine production has steadily increased. Underground mining is expected to continue to dominate Illinois coal production into the 21st century. The drive for higher production and lower operating costs should increase the number of longwall and high extraction retreat mines. This will be achieved through conversion of existing room and pillar mines or initiation of new underground mining operations. The environmental regulations that govern the mitigation of surface impacts have evolved at both the state and federal level. Federal regulations passed in 1995 modifying the Surface Mining Control and Reclamation Act mandated additional restrictions and regulatory requirements beyond those adopted in 1977. State regulatory bodies that implement the regulations are now working to bring their regulations and procedures into compliance with the oversight federal counterpart. many states have raised concerns over the practical application of certain aspects of the new permitting requirements. This paper describes past and present subsidence regulations in Illinois, their impact on the coal industry and on the landowners above underground coal mining. Potential problems in implementation of the new regulatory requirements as well as additional burdens placed on coal companies to comply with the regulations are explored.

  3. ESPC ENABLE Final Proposal Requirements

    Broader source: Energy.gov [DOE]

    Document describes the final proposal requirements for consideration by an energy service company (ESCO) for an agency’s Request for Quote/Notice of Opportunity or final proposal. If selected to perform a site investment grade audit, the ESCO will be required to present the findings from the IGA and a project price to the agency in the form of a final proposal.

  4. Energy Sector Cybersecurity Framework Implementation Guidance

    Broader source: Energy.gov (indexed) [DOE]

    FOR PUBLIC COMMENT SEPTEMBER, 2014 ENERGY SECTOR CYBERSECURITY FRAMEWORK IMPLEMENTATION GUIDANCE Energy Sector Cybersecurity Framework Implementation Guidance Table of Contents...

  5. Departmental Personnel Security - Implementation Guidance | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Departmental Personnel Security - Implementation Guidance Implementation Guidance Overview of Security ClearanceAccess Authorization Process for Applicants Drug Testing ...

  6. Guiding Principles for Successfully Implementing Industrial Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guiding Principles for Successfully Implementing Industrial Energy Assessment Recommendations Guiding Principles for Successfully Implementing Industrial Energy Assessment ...

  7. Pressure Safety Program Implementation at ORNL

    SciTech Connect (OSTI)

    Lower, Mark; Etheridge, Tom; Oland, C. Barry

    2013-01-01

    The Oak Ridge National Laboratory (ORNL) is a US Department of Energy (DOE) facility that is managed by UT-Battelle, LLC. In February 2006, DOE promulgated worker safety and health regulations to govern contractor activities at DOE sites. These regulations, which are provided in 10 CFR 851, Worker Safety and Health Program, establish requirements for worker safety and health program that reduce or prevent occupational injuries, illnesses, and accidental losses by providing DOE contractors and their workers with safe and healthful workplaces at DOE sites. The regulations state that contractors must achieve compliance no later than May 25, 2007. According to 10 CFR 851, Subpart C, Specific Program Requirements, contractors must have a structured approach to their worker safety and health programs that at a minimum includes provisions for pressure safety. In implementing the structured approach for pressure safety, contractors must establish safety policies and procedures to ensure that pressure systems are designed, fabricated, tested, inspected, maintained, repaired, and operated by trained, qualified personnel in accordance with applicable sound engineering principles. In addition, contractors must ensure that all pressure vessels, boilers, air receivers, and supporting piping systems conform to (1) applicable American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (2004) Sections I through XII, including applicable code cases; (2) applicable ASME B31 piping codes; and (3) the strictest applicable state and local codes. When national consensus codes are not applicable because of pressure range, vessel geometry, use of special materials, etc., contractors must implement measures to provide equivalent protection and ensure a level of safety greater than or equal to the level of protection afforded by the ASME or applicable state or local codes. This report documents the work performed to address legacy pressure vessel deficiencies and comply

  8. Provenance management in Swift with implementation details.

    SciTech Connect (OSTI)

    Gadelha, L. M. R; Clifford, B.; Mattoso, M.; Wilde, M.; Foster, I.

    2011-04-01

    The Swift parallel scripting language allows for the specification, execution and analysis of large-scale computations in parallel and distributed environments. It incorporates a data model for recording and querying provenance information. In this article we describe these capabilities and evaluate interoperability with other systems through the use of the Open Provenance Model. We describe Swift's provenance data model and compare it to the Open Provenance Model. We also describe and evaluate activities performed within the Third Provenance Challenge, which consisted of implementing a specific scientific workflow, capturing and recording provenance information of its execution, performing provenance queries, and exchanging provenance information with other systems. Finally, we propose improvements to both the Open Provenance Model and Swift's provenance system.

  9. Providing Resources for Implementation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Resources for Implementation Providing Resources for Implementation This presentation discusses the resources needed to prepare for implementing an energy efficiency project and provides suggestions for developing internal resources and seeking external ones. Providing Resources for Implementation (May 12, 2010) (907 KB) More Documents & Publications Creating a Climate for Successful Project Implementation Preparing for Project Implementation Assigning Accountability for Each Project, April

  10. Implementation Plan Synopsis Directive Number, Title Summary of Implementation Plan:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Services » Earned Value Management » Implemenation Guidance Implemenation Guidance Earned Value Management (EVM) is a systematic approach to the integration and measurement of cost, schedule, and technical (scope) accomplishments on a project or task. Following established implementation guidelines and conducting periodic surveillance of implemented EVM System (EVMS) will ensure that both the government and contractors have the ability to examine detailed schedule information, critical program

  11. MIST final report

    SciTech Connect (OSTI)

    Geissler, G.O. )

    1991-08-01

    The Multiloop Integral System Test (MIST) Facility is a scaled 2-by-4 (two hot legs and four cold legs) model of the Babcock Wilcox lowered-loop nuclear steam supply system. The project was sponsored by the Nuclear Regulatory Commission, the Electric Power Research Institute, the Babcock Wilcox Owners Group, and Babcock Wilcox. Experiments performed at the Babcock Wilcox Alliance Research Center provide integral system data to be used in the verification of predictive best-estimate codes. The Phase 3 test program, performed from June 1986 through August 1987, examined the impact of the boundary systems, break size and location, feed-and-bleed cooling, steam generator tube rupture, noncondensible gas, and reactor coolant pumps on small-break loss-of-coolant accident (SBLOCA) transients. Additional tests in the Phase 4 program explored the current operating procedures for mitigating various accident conditions and investigated possible alternative strategies. This report provides a description of the MIST test facility, test specifications, test conduct, observations obtained from each test, test comparisons, and a summary of the MIST Phase 4 Test Program. 12 refs., 229 figs., 36 tabs.

  12. Final project report

    SciTech Connect (OSTI)

    Nitin S. Baliga and Leroy Hood

    2008-11-12

    The proposed overarching goal for this project was the following: Data integration, simulation and visualization will facilitate metabolic and regulatory network prediction, exploration, and formulation of hypotheses. We stated three specific aims to achieve the overarching goal of this project: (1) Integration of multiple levels of information such as mRNA and protein levels, predicted protein-protein interactions/associations and gene function will enable construction of models describing environmental response and dynamic behavior. (2) Flexible tools for network inference will accelerate our understanding of biological systems. (3) Flexible exploration and queries of model hypotheses will provide focus and reveal novel dependencies. The underlying philosophy of these proposed aims is that an iterative cycle of experiments, experimental design, and verification will lead to a comprehensive and predictive model that will shed light on systems level mechanisms involved in responses elicited by living systems upon sensing a change in their environment. In the previous years report we demonstrated considerable progress in development of data standards, regulatory network inference and data visualization and exploration. We are pleased to report that several manuscripts describing these procedures have been published in top international peer reviewed journals including Genome Biology, PNAS, and Cell. The abstracts of these manuscripts are given and they summarize our accomplishments in this project.

  13. EA-1673: Final Environmental Assessment

    Office of Energy Efficiency and Renewable Energy (EERE)

    10 CFR 431 Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and Test Procedures for Commercial Heating, Air-Conditioning, and Water-Heating Equipment

  14. Final Report for Enhancing the MPI Programming Model for PetaScale Systems

    Office of Scientific and Technical Information (OSTI)

    (Technical Report) | SciTech Connect Final Report for Enhancing the MPI Programming Model for PetaScale Systems Citation Details In-Document Search Title: Final Report for Enhancing the MPI Programming Model for PetaScale Systems This project performed research into enhancing the MPI programming model in two ways: developing improved algorithms and implementation strategies, tested and realized in the MPICH implementation, and exploring extensions to the MPI standard to better support

  15. Title XVII Final Rule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Rule Title XVII Final Rule Title XVII Final Rule (107.56 KB) More Documents & Publications Final Rule (December 4, 2009) Notice of Proposed Rulemaking (August 6, 2009) Final Rule (October 23, 2007)

  16. Final Technical Report

    SciTech Connect (OSTI)

    Aristos Aristidou Natureworks); Robert Kean; Tom Schechinger; Stuart Birrell; Jill Euken

    2007-10-01

    The two main objectives of this project were: 1) to develop and test technologies to harvest, transport, store, and separate corn stover to supply a clean raw material to the bioproducts industry, and 2) engineer fermentation systems to meet performance targets for lactic acid and ethanol manufacturers. Significant progress was made in testing methods to harvest corn stover in a “single pass” harvest mode (collect corn grain and stover at the same time). This is technically feasible on small scale, but additional equipment refinements will be needed to facilitate cost effective harvest on a larger scale. Transportation models were developed, which indicate that at a corn stover yield of 2.8 tons/acre and purchase price of $35/ton stover, it would be unprofitable to transport stover more than about 25 miles; thus suggesting the development of many regional collection centers. Therefore, collection centers should be located within about 30 miles of the farm, to keep transportation costs to an acceptable level. These collection centers could then potentially do some preprocessing (to fractionate or increase bulk density) and/or ship the biomass by rail or barge to the final customers. Wet storage of stover via ensilage was tested, but no clear economic advantages were evident. Wet storage eliminates fire risk, but increases the complexity of component separation and may result in a small loss of carbohydrate content (fermentation potential). A study of possible supplier-producer relationships, concluded that a “quasi-vertical” integration model would be best suited for new bioproducts industries based on stover. In this model, the relationship would involve a multiyear supply contract (processor with purchase guarantees, producer group with supply guarantees). Price will likely be fixed or calculated based on some formula (possibly a cost plus). Initial quality requirements will be specified (but subject to refinement).Producers would invest in harvest

  17. Microsoft Word - ASC Rules of Procedure_FINAL_05-22-2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Northwest Power Act requires the Bonneville Power Administration (BPA) to develop a methodology for determining a utility's average system cost (ASC) for the purpose of selling...

  18. Gen IV Materials Handbook Implementation Plan

    SciTech Connect (OSTI)

    Rittenhouse, P.; Ren, W.

    2005-03-29

    maintenance and enhancement. Contracting of development of the Handbook website is discussed in terms of host server options, cost, technology, developer background and cooperative nature, and company stability. One of the first and most important activities in website development will be the generation of a detailed Handbook product requirements document including case diagrams and functional requirements tables. The Implementation Plan provides a detailed overview of the organizational structure of the Handbook and details of Handbook preparation, publication, and distribution. Finally, the Implementation Plan defines Quality Assurance requirements for the Handbook.

  19. Practice and Procedure Guide | Open Energy Information

    Open Energy Info (EERE)

    Practice and Procedure Guide Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Practice and Procedure GuideLegal Abstract Public...

  20. Sandia Satellite Program summary of operational procedures

    SciTech Connect (OSTI)

    Not Available

    1989-08-01

    Operational procedures for the Space Systems Department and Space Sensors Department are described. Departmental policies and procedures from design of systems for space applications through qualification for spaceflight are summarized. 1 fig.

  1. Chapter 13 - Simplified Acquisition Procedures | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    13.1 - Purchase Card Policy and Operating Procedures 13.2PurchaseOrders0.pdf Acq. Guide 13.3 Simplified Acqusition Procedures.pdf More Documents & Publications POLICY FLASH...

  2. Final Technical Report

    SciTech Connect (OSTI)

    Bohdan W. Oppenheim

    2007-02-27

    In the fiscal years 2003 through 2006, the LMU-IAC conducted 76 industrial assessments with 595 assessment recommendations, with 382 recommendations implemented, with practically all plant types and sizes, extending in geographical location from about 250 miles north of LMU-IAC to 50 miles south and 90 miles east. Plant sizes varied from one building of 30,000 sq ft to 17 buildings of 1.5 million sq ft. The amount of energy savings identified was worth about $34,303,699. Because of the national level Lean Productivity programs at the university, LMU-IAC is unique in its expertise of the impact of Lean productivity on energy savings, which is huge, far exceeding the energy savings from the equipment improvements. Besides energy savings, LMU-IAC promoted the good name of the program and DOE in the local industry, utilities, trade organizations, the vast aerospace industry, educational institutions, and the public. The IAC work resulted in numerous public lectures, a chapter in the Encyclopedia of Industrial Energy, and several journal articles. 37 students, including 8 graduate students have been trained and issued DOE IAC Certificates. Several of them found work as energy experts.

  3. Northwest Ohio Final Report

    SciTech Connect (OSTI)

    Moyer, Kevin

    2015-03-04

    EXECUTIVE SUMMARY When the Toledo Lucas County Port Authority (TLCPA) filed for the Department of Energy EECBG grant in late 2009, it was part of a strategic and Board backed objective to expand the organization’s economic development and financing programs into alternative energy and energy efficiency. This plan was filed with the knowledge and support of the areas key economic development agencies. The City of Toledo was also a key partner with the Mayor designating a committee to develop a Strategic Energy Policy for the City. This would later give rise to a Community Sustainability Strategic Plan for Toledo, Lucas County and the surrounding region with energy efficiency as a key pillar. When the TLCPA signed the grant documents with the DOE in June of 2010, the geographic area was severely distressed economically, in the early stages of a recovery from over a 30% drop in business activity and high unemployment. The TLCPA and its partners began identifying potential project areas well before the filing of the application, continuing to work diligently before the formal award and signing of the grant documents. Strong implementation and actions plans and business and financing models were developed and revised throughout the 3 year grant period with the long term goal of creating a sustainable program. The TLCPA and the City of Toledo demonstrated early leadership by forming the energy improvement district and evaluating buildings under their control including transportation infrastructure and logistics, government services buildings and buildings which housed several for profit and not for profit tenants while completing significant energy efficiency projects that created public awareness and confidence and solid examples of various technologies and energy savings. As was stated in the DOE Award Summary, the undertaking was focused as a commercial program delving into Alternative Energy Utility Districts; what are referred to in Ohio Statute as Energy Special

  4. CRAD, NNSA- ISMS Implementation (FRAM)

    Broader source: Energy.gov [DOE]

    CRAD for ISMS Implementation (FRAM). Criteria Review and Approach Documents (CRADs) that can be used to conduct a well-organized and thorough assessment of elements of safety and health programs.

  5. CRAD, NNSA- ISMS Implementation (Contracts)

    Broader source: Energy.gov [DOE]

    CRAD for ISMS Implementation (Contracts). Criteria Review and Approach Documents (CRADs) that can be used to conduct a well-organized and thorough assessment of elements of safety and health programs.

  6. Quality Procedure - Stop Work | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Stop Work Quality Procedure - Stop Work This Quality Procedure establishes the Office of Standards and Quality Assurance authority, responsibilities, and instructions to direct that unsafe work be stopped, during the execution and operations of its activities, specifically in oversight activities. this procedure is utilized and accomplished upon coordination with management of the Environmental Management (EM) Headquarters and Field Office. This procedure also provides provisions for the restart

  7. Delegation Procedures - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Breadcrumb >> Breadcrumb Delegation Procedures by Website Administrator Text Delegation Procedures - by Website Administrator - last modified Mar 23, 2015 11:12 AM Procedures for Line Managers' Delegations of Authority when proposing new delegations, redelegating existing delegation, proposing an amendment, rescinding a delegation, and when a delegation is not needed. Delegation Template - by Website Administrator - last modified Dec 19, 2013 10:27 AM Text Redelegation Procedures - by

  8. Quality Procedure - Document Review | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review Quality Procedure - Document Review This procedure establishes the process for the reivew and approval of Environmental Managemnt (EM) Quality Assurance (QA) program documents as performed by the Office of Standards and Quality Assurance. This procedure also establishes the process for review and approval of other EM documents external to the EM Headquarters Office of Standards and Quality Assurance. Quality Procedure - Document Review (1.97 MB) More Documents & Publications Quality

  9. MIST final report

    SciTech Connect (OSTI)

    Gloudemans, J.R. )

    1991-08-01

    The multiloop integral system test (MIST) was part of a multiphase program started in 1983 to address small-break loss-of-coolant accidents (SBLOCAs) specific to Babcock Wilcox-designed plants. MIST was sponsored by the US Nuclear Regulatory Commission, the Babcock Wilcox Owners Group, the Electric Power Research Institute, and Babcock Wilcox. The unique features of the Babcock Wilcox design, specifically the hot leg U-bends and steam generators, prevented the use of existing integral system data or existing integral system facilities to addresss the thermal-hydraulic SBLOCA questions. MIST was specifically designed and constructed for this program, and an existing facility -- the once-through integral system (OTIS) -- was also used. Data from MIST and OTIS are used to benchmark the adequacy of system codes, such as RELAP5 and TRAC, for predicting abnormal plant transients. The MIST program is reported in eleven volumes; Volumes 2 through 8 pertain to groups of Phase 3 tests by type, Volume 9 presents inter-group comparisons. Volume 10 provides comparisons between the RELAP5 MOD2 calculations and MIST observations, and Volume 11 (with addendum) presents the later, Phase 4 tests. This is Volume 1 of the MIST final report, a summary of the entire MIST program. Major topics include: test advisory grop (TAG) issues; facility scaling and design; test matrix; observations; comparisons of RELAP5 calculations to MIST observations; and MIST versus the TAG issues. 11 refs., 29 figs., 9 tabs.

  10. Final Report to DOE

    SciTech Connect (OSTI)

    Ismail Gultepe

    2012-05-15

    This final report summarizes the accomplished goals and provide a list of the publications and presentations made during the project. The goals of the project were accomplished through the various publications submitted to Journals and presentations done at the DOE and international meetings and conferences. The 8 journal articles related to the goals of this project were accepted or submitted. The 23 presentations related to goals of the project were presented at the meetings. There were some minor changes regarding to project goals because of issues encountered during the analysis of the data. For example, a total water probe sensor mounted on the Convair-580 that can be used for defining mixed phase conditions and parameterization, had some problems to estimate magnitude of total water mass, and this resulted in issues providing an accurate parameterization for cloud fraction. Variability related aerosol number concentrations and their composition for direct and indirect effects were studied and published. Results were given to explain aerosol and ice microphysical effects on climate change studies. It is suggested that developed parameterizations should consider the variability in aerosol and ice parameters over the Arctic regions.

  11. Final Technical Report

    SciTech Connect (OSTI)

    Alexander Fridman

    2005-06-01

    This DOE project DE-FC36-04GO14052 ''Plasma Pilot Plant Test for Treating VOC Emissions from Wood Products Plants'' was conducted by Drexel University in cooperation with Georgia-Pacific (G-P) and Kurchatov Institute (KI). The objective of this project was to test the Plasma Pilot Plant capabilities in wood industry. The final goal of the project was to replace the current state-of-the-art, regenerative thermal oxidation (RTO) technology by Low-Temperature Plasma Technology (LTPT) in paper and wood industry for Volatile Organic Components (VOC) destruction in High Volume Low Concentration (HVLC) vent emissions. MetPro Corporation joined the team as an industrial partner from the environmental control business and a potential leader for commercialization. Concurrent Technology Corporation (CTC) has a separate contract with DOE for this technology evaluation. They prepared questionnaires for comparison of this technology and RTO, and made this comparison. These data are presented in this report along with the description of the technology itself. Experiments with the pilot plant were performed with average plasma power up to 3.6 kW. Different design of the laboratory and pilot plant pulsed coronas, as well as different analytical methods revealed many new peculiarities of the VOC abatement process. The work reported herein describes the experimental results for the VOCs removal efficiency with respect to energy consumption, residence time, water effect and initial concentration.

  12. Final Technical Report

    SciTech Connect (OSTI)

    Alexander Pigarov

    2012-06-05

    This is the final report for the Research Grant DE-FG02-08ER54989 'Edge Plasma Simulations in NSTX and CTF: Synergy of Lithium Coating, Non-Diffusive Anomalous Transport and Drifts'. The UCSD group including: A.Yu. Pigarov (PI), S.I. Krasheninnikov and R.D. Smirnov, was working on modeling of the impact of lithium coatings on edge plasma parameters in NSTX with the multi-species multi-fluid code UEDGE. The work was conducted in the following main areas: (i) improvements of UEDGE model for plasma-lithium interactions, (ii) understanding the physics of low-recycling divertor regime in NSTX caused by lithium pumping, (iii) study of synergistic effects with lithium coatings and non-diffusive ballooning-like cross-field transport, (iv) simulation of experimental multi-diagnostic data on edge plasma with lithium pumping in NSTX via self-consistent modeling of D-Li-C plasma with UEDGE, and (v) working-gas balance analysis. The accomplishments in these areas are given in the corresponding subsections in Section 2. Publications and presentations made under the Grant are listed in Section 3.

  13. Final Technical Report

    SciTech Connect (OSTI)

    Velasco, Mayda

    2013-11-01

    This work is focused on the design and construction of novel beam diagnostic and instrumentation for charged particle accelerators required for the next generation of linear colliders. Our main interest is in non-invasive techniques. The Northwestern group of Velasco has been a member of the CLIC Test Facility 3 (CTF3) collaboration since 2003, and the beam instrumentation work is developed mostly at this facility1. This 4 kW electron beam facility has a 25-170 MeV electron LINAC. CTF3 performed a set of dedicated measurements to finalize the development of our RF-Pickup bunch length detectors. The RF-pickup based on mixers was fully commissioned in 2009 and the RF-pickup based on diodes was finished in time for the 2010-11 data taking. The analysis of all the data taken in by the summer of 2010 was finish in time and presented at the main conference of the year, LINAC 2010 in Japan.

  14. Code of Federal Regulations Procedural Rules for DOE Nuclear Activities Part II

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Department of Energy (DOE) is issuing procedural rules to be used in applying its substantive regulations and orders relating to nuclear safety. These procedural rules are intended to be an essential part of the framework through which DOE deals with its contractors, subcontractors, and suppliers to ensure its nuclear facilities are operated in a manner that protects public and worker safety and the environment. In particular, this part sets forth the procedures to implement the provisions of the Price- Anderson Amendments Act of 1988 (PAAA) which subjects DOE contractors to potential civil and criminal penalties for violations of DOE rules, regulations and orders relating to nuclear safety (DOE Nuclear Safety Requirements).

  15. Park Implementation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    History » Manhattan Project National Historical Park » Park Implementation Park Implementation NPS Director Jonathan Jarvis and Secretary of Energy Ernest Moniz Stay up to date on progress towards our nation's newest national park. February 11-12, 2016 NPS and DOE participants in the Foundation Workshops meet in Denver, Colorado, to assess the workshop findings, develop interpretive themes for the park, and discuss next steps. February 1-9, 2016 The NPS in coordination with DOE holds

  16. Final Technical Progress Report

    SciTech Connect (OSTI)

    J.Y. Hwang; R.C. Greenlund

    2002-12-31

    Michigan Technological University has demonstrated major inroads in establishing the viability of utilizing aluminum smelting by-product waste materials in lightweight concrete product applications. The research identified key elements of producing various forms of lightweight concrete products through utilizing various procedures and mixture components with the by-product materials. A process was developed through pilot plant testing that results in additional aluminum recovery at finer sizes, a clean returnable salt product through spray drying technology, and a low-salt-content oxide product with enough aluminum metal content that it can be used to form lightweight cementitious mixtures. Having three distinct products aids in generating favorable process economics. Revenue projections from aluminum recovery and salt recovery are enough to cover processing costs and create a cost-free oxide product to market for lightweight concrete applications. This supply side commercialization strategy offers aluminum by-product recyclers a potentially no cost product, which has been demonstrated through this project to create desirable and marketable lightweight concrete products of various forms. Environmental benefits to the public are tremendous. At best, all dross and salt cake materials have the potential to be completely recycled and utilized. At worst, disposal sites would see a reduced amount of material: a post processed oxide product with little salt and no hydrogen sulfide or ammonia gas generating capability, which, if isolated from high alkali conditions, would pose no reactivity concerns. The US aluminum industry has historically, along with the steel industry, been a leader in recycling metal. The findings from this project, increased metal recovery, improved salt recycling, and demonstrated end uses for oxide residues, will go a long way in helping the aluminum industry obtain 100% material utilization and zero discharge.

  17. TMACS Test Procedure TP007: System administration

    SciTech Connect (OSTI)

    Scanlan, P.; Washburn, S.; Seghers, R.

    1994-05-24

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS System Administration functions.

  18. TMACS Test Procedure TP001: Alarm Management

    SciTech Connect (OSTI)

    Scanlan, P.K.

    1994-05-31

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Alarm management functions.

  19. TMACS Test Procedure TP002: Trending

    SciTech Connect (OSTI)

    Scanlan, P.K.

    1994-05-31

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Trending functions.

  20. TMACS Test Procedure TP009: Acromag Driver

    SciTech Connect (OSTI)

    Washburn, S.J.

    1994-05-31

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Acromag Software Driver (Bridge Code).

  1. TMACS Test Procedure TP002: Trending

    SciTech Connect (OSTI)

    Scanlan, P.K.

    1994-08-29

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Trending functions.

  2. Phase 5 storage (Project W-112) Central Waste Complex operational readiness review, final report

    SciTech Connect (OSTI)

    Wight, R.H.

    1997-05-30

    This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included.

  3. MTX final report

    SciTech Connect (OSTI)

    Hooper, E.B.; Allen, S.L.; Brown, M.D.; Byers, J.A.; Casper, T.A.; Cohen, B.I.; Cohen, R.H.; Fenstermacher, M.E.; Foote, J.H.; Hoshino, K.

    1994-01-01

    The MTX experiment was proposed in 1986 to apply high frequency microwaves generated by a free-electron laser (FEL) to electron cyclotron resonance heating (ECRH) in a high field, high density tokamak. As the absorption of microwaves at the electron cyclotron resonance requires high frequencies, the opportunity of applying a free-electron laser has appeal as the device is not limited to frequencies in the microwave or long millimeter wavelength regions, in contrast to many other sources. In addition, the FEL is inherently a high power source of microwaves, which would permit single units of 10 MW or more, optimum for reactors. Finally, it was recognized early in the study of the application of the FEL based on the induction linear accelerator, that the nonlinear effects associated with the intense pulses of microwaves naturally generated would offer several unique opportunities to apply ECRH to current drive, MHD control, and other plasma effects. It was consequently decided to adapt the induction accelerator based FEL to heating and controlling the tokamak, and to conduct experiments on the associated physics. To this end, the Alcator C tokamak was moved from the Massachusetts Institute of Technology (MIT) to the Lawrence Livermore National Laboratory where it was installed in Building 431 and operated from March, 1989, until the conclusion of the experiment in October, 1992. The FEL, based on the ETA-11 accelerator and IMP wiggler was brought into operation by the LLNL Electron Beam Group and power injected into the tokamak during an experimental run in the Fall, 1989. Following an upgrade by the MTX group, a second experimental run was made lasting from the Winter, 1992 through the end of the experiment. Significant contributions to the ECRH experiments were made by the Japan Atomic Energy Research Institute (JAERI).

  4. FINAL_DOE_OGPVer1_2_24Jun2010.pdf | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    _2_24Jun2010.pdf FINAL_DOE_OGPVer1_2_24Jun2010.pdf (2.84 MB) More Documents & Publications FINAL_DOE_OGPVer1-2b_07July2010.pdf Open Government Plan 1.0 Federal Building Metering Implementation Plan Template

  5. FFTF Final Safety Analysis Report Amendment 82

    SciTech Connect (OSTI)

    DAUTEL, W.A.

    2003-03-01

    This is the Final Safety Analysis Report (FSAR) Amendment 82 for incorporation into the Fast Flux Test Facility (FFTF) FSAR set assigned to you. This page change amendment incorporates changes previously approved by the U.S. Department of Energy, Richland Operations Office. This amendment provides updates to the FSAR to facilitate FFTF shutdown and deactivation. Among the changes are the following: Chapter 11 is updated to describe upgrades to the Solid Waste Cask. Additional fuel handling accidents are added to Chapter 15. Appendix G is revised to clearly identify systems and their safety functions. Appendix H is revised to remove the discussion of material that has been removed from the Interim Storage Area. Appendix I is revised to provide a general description of liquid metal removal from FFTF. Other changes include minor technical updates from the FSAR annual review and editorial and procedure references.

  6. HUMAN RELIABILITY ANALYSIS FOR COMPUTERIZED PROCEDURES

    SciTech Connect (OSTI)

    Ronald L. Boring; David I. Gertman; Katya Le Blanc

    2011-09-01

    This paper provides a characterization of human reliability analysis (HRA) issues for computerized procedures in nuclear power plant control rooms. It is beyond the scope of this paper to propose a new HRA approach or to recommend specific methods or refinements to those methods. Rather, this paper provides a review of HRA as applied to traditional paper-based procedures, followed by a discussion of what specific factors should additionally be considered in HRAs for computerized procedures. Performance shaping factors and failure modes unique to computerized procedures are highlighted. Since there is no definitive guide to HRA for paper-based procedures, this paper also serves to clarify the existing guidance on paper-based procedures before delving into the unique aspects of computerized procedures.

  7. Final Technical Report

    SciTech Connect (OSTI)

    Kosanovic, Dragoljub

    2008-02-29

    The industrial Assessment Center at the University of Massachusetts completed 83 assessments in this project period, covering all states in New England and the eastern part of New York. The combined energy consumption for these facilities was more than 750,000,000 kWh costing approximately $77,000,000 for electricity and close to 5,600,000 MMBtu for all fossil fuels combined, totaling almost $37,000,000. The average annual energy costs per plant were $1,372,600. We had almost eight recommendations per assessment, and the implemented recommendations alone are saving these facilities on an average $66,500 or almost 5% of their total energy bill. We have organized and participated in sixteen seminars and presentations promoting energy efficiency practices and other DOE tools and programs. Our center developed the Chilled Water System Assessment tool that is part of DOEs BestPractices Suite of Tools. During this period we had nineteen students in the program. Fifteen were graduate students, and four were undergraduate students. Eleven of them graduated with the Masters of Science degree in mechanical engineering and are working in the energy field, and three are currently in the program. Two undergraduate students were hired by engineering firms that perform energy efficiency services, and one continued his education and is pursuing an advanced engineering degree. We cooperate with the Manufacturing Extension Partnerships and state Energy Offices to provide energy efficiency services to their constituents. As a result of our activities, all our clients requested assessments or were referred to us by one of the state energy offices, the MEPs or DOE. Our current and former staff members hold 16 Qualified Specialist certificates. Seven of those were awarded to our students while participating in the IAC program. Currently we have three staff members with nine QS certificates and two students with four. Three people from our staff were involved in the DOEs Save Energy

  8. Final Scientific Report

    SciTech Connect (OSTI)

    Dr. Caine Finnerty

    2008-01-14

    NanoDynamics Inc. has undertaken a study to develop and demonstrate an anode-supported solid oxide fuel cell capable of generating a minimum of 20 W per cell on hydrogen. The cell technology will also be assed for operation on renewable hydrocarbon-based fuels such as biomass gas, as well its applicability for larger-scale power production. The project was divided into five sub-tasks, the first of which was the development and refinement of the cell manufacturing processes of gel-casting and paste extrusion for the fabrication of planar and tubular anode supports. These methods exhibited high production yields with excellent reproducibility. Using a conventional YSZ-based cell as a performance benchmark, new materials-sets and cell configurations were developed. Three prototype configurations were implemented, the best generating an average of 10 W per cell, and exhibiting excellent potential for further development and scale-up. Using a variety of techniques such as modifying the materials-set, microstructure, and cell configuration, cells with an average power output of 22.7 W were demonstrated, 13.5% in excess of the 20 W project goal. Thermal cycling was performed on such cells, and it was found that over a regime of 150 cycles (approximately 300 h), the cell power increased by 1.8%. So-called “short-stacks” comprised of up to 6 cells were fabricated to study the feasibility of further stack scale-up. Such a 6-cell short-stacks operated on dry hydrogen exhibited power outputs of 80 W, a 6.4% power increase from their constituent cells, showing that the cells had excellent potential for further scale-up. Optimized Rev A cells were built into a 3-cell stack, and found to produce 63.42 W operating on hydrogen, and 58.18 W on methane. The feasibility of a biogas-fed SOFC was also investigated. Utilizing in-house developed catalysts, methane conversion and hydrogen yield was found to be 98 and 42%, respectively. By incorporating this catalyst material into

  9. LIVE_NSB_final.wmv

    ScienceCinema (OSTI)

    None

    2010-09-01

    National Science Bowl finals and awards at the National Building Museum in Washington D.C. Monday 5/3/2010

  10. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    upcoming action and follow-up items. * Attachment 5: Tri-Party Agreement Agency Fiscal Year 2015 Work Plan- RAP-focused Topics1: Transcribed flipcharts Final Meeting...

  11. EA-1637: Final Environmental Assessment

    Office of Energy Efficiency and Renewable Energy (EERE)

    10 CFR 431 Energy Conservation Program for Commerical and Industrial Equipment: Packaged Terminal Air Conditioner and Packaged Terminal Heat Pump Energy Conservation Standards; Final Rule

  12. DACS upgrade acceptance test procedure

    SciTech Connect (OSTI)

    Zuehlke, A.C.

    1994-09-28

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the mixer pump, directional drive system, and the instrumentation associated with the SY-101 tank and support systems, and the proper functioning of the DACS with new Model 984-785 Programmable Logic Controllers (PLCs), new MODBUS PLUS version 2.01 software for the PLCs, and version 3.72 of the GENESIS software will be systematically evaluated by performance of this procedure. The DACS, which is housed in a trailer located just outside of the north fence at the SY tank farm, receives input signals from a variety of sensors located in and around the SY-101 tanks. These sensors provide information such as: tank vapor space and ventilation system H{sub 2} concentration; tank waste temperature; tank pressure; waste density; operating pump parameters such as speed, flow, rotational position, discharge pressure, and internal temperature; strain (for major equipment); and waste level. The output of these sensors is conditioned and transmitted to the DACS computers where these signals are displayed, recorded, and monitored for out-of-specification conditions. If abnormal conditions are detected, then, in certain situations, the DACS automatically generates alarms and causes the system to abort pump operations.

  13. Unveiling the Implementation Guide | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Unveiling the Implementation Guide Unveiling the Implementation Guide This presentation addresses the implementation guide and features a best practice presentation from Raytheon. Unveiling the Implementation Guide (October 11, 2011) (2.27 MB) More Documents & Publications Energy Assessments Guiding Principles for Successfully Implementing Industrial Energy Assessment Recommendations Building America Technology Solutions for New and Existing Homes: Foundation Heat Exchanger, Oak Ridge,

  14. Guiding Principles for Successfully Implementing Industrial Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment Recommendations | Department of Energy Guiding Principles for Successfully Implementing Industrial Energy Assessment Recommendations Guiding Principles for Successfully Implementing Industrial Energy Assessment Recommendations This implementation guide provides key principles and activities that will lead to the successful implementation of recommendations during energy assessments. Implementation Guidebook (April 2011) (7.11 MB) More Documents & Publications Unveiling the

  15. Roadmap for Peridynamic Software Implementation

    SciTech Connect (OSTI)

    Littlewood, David John

    2015-10-01

    The application of peridynamics for engineering analysis requires an efficient and robust software implementation. Key elements include processing of the discretization, the proximity search for identification of pairwise interactions, evaluation of the con- stitutive model, application of a bond-damage law, and contact modeling. Additional requirements may arise from the choice of time integration scheme, for example esti- mation of the maximum stable time step for explicit schemes, and construction of the tangent stiffness matrix for many implicit approaches. This report summaries progress to date on the software implementation of the peridynamic theory of solid mechanics. Discussion is focused on parallel implementation of the meshfree discretization scheme of Silling and Askari [33] in three dimensions, although much of the discussion applies to computational peridynamics in general.

  16. section999-final-reports | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EPAct2005 Section 999 Final Project Reports Final reports for completed RPSEA administered projects under Title IX, Subtitle J, Section 999 of the Energy Policy Act of 2005 are listed below. Title IX, Subtitle J, Section 999 of the Energy Policy Act of 2005 is implemented by NETL. RPSEA administers select elements of the R&D program for DOE. Unconventional Natural Gas and Other Petroleum Resources | Small Producer Ultra-Deep Water 10121-4903-02 Autonomous Underwater Inspection Using a 3D

  17. Self-assessment program implementation plan. Revision A

    SciTech Connect (OSTI)

    Quets, A.L.

    1991-10-23

    This implementation plan identifies and describes the tasks that must be completed in order to successfully implement a Self-Assessment (SA) Program. The purpose of the Self-Assessment Program is to comply with applicable Department of Energy (DOE) directives and orders, Federal, State, and local regulations, operate the Pinellas Plant according to best management practices, and achieve excellence in all operating areas. The Self-Assessment Program will be applied to the Pinellas Plant facility which includes buildings, grounds, equipment, operations, and activities under the control of line management. Furthermore, all applicable disciplines under environmental protection, safety, health and management will be covered by the program. The Self-Assessment Program has been designed to accomplish the following tasks: define the scope of the Self-Assessment Program; assign organizational roles and responsibilities; address EH and S functional elements and management issues; develop a Self-Assessment program charter and policy; identify all applicable EH and S codes, regulations and standards; develop self-assessment procedures and instructions; generate a Self-Assessment Manual; develop a master schedule for facility appraisals and audits; design checklists and report formats for recording appraisal data; implement an assessment tracking and reporting system; implement a root cause analysis and corrective action system; implement a trend analysis and lessons learned system; and establish a formal training program.

  18. Clean Energy Works Oregon Final Technical Report

    SciTech Connect (OSTI)

    Jacob, Andria; Cyr, Shirley

    2013-12-31

    In April 2010, the City of Portland received a $20 million award from the U.S. Department of Energy, as part of the Energy Efficiency and Conservation Block Grant program. This award was appropriated under the American Recovery and Reinvestment Act (ARRA), passed by President Obama in 2009. DOE’s program became known as the Better Buildings Neighborhood Program (BBNP). The BBNP grant objectives directed the City of Portland Bureau of Planning and Sustainability (BPS) as the primary grantee to expand the BPS-led pilot program, Clean Energy Works Portland, into Clean Energy Works Oregon (CEWO), with the mission to deliver thousands of home energy retrofits, create jobs, save energy and reduce carbon dioxide emissions.The Final Technical Report explores the successes and lessons learned from the first 3 years of program implementation.

  19. Plain Writing Implementation Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plain Writing Implementation Plan Plain Writing Implementation Plan Plain Writing Implementation Plan July 13, 2011.pdf (120.01 KB) More Documents & Publications Plain Language Compliance Report (2012) PLAIN LANGUAGE COMPLIANCE REPORT (2013) Plain Language Compliance Report (2014

  20. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to get in touch with a member of the planning group. Pam shared a video on Hanford emergency response procedures. ... C. One of the largest problems with the methodology is that it ...

  1. The AMTEX Partnership{trademark}: Policy and procedures

    SciTech Connect (OSTI)

    1995-08-01

    The AMTEX Partnership is a path-finding research and development collaboration among the US Department of Energy, the contract operators of its national laboratories, and research, education, technology transfer (RETT) consortia representing the integrated textile industry. The goal of AMTEX is to strengthen the competitiveness of the US textile industry. The complex nature of the collaboration requires consistent and reliable policy direction. The policies, stated in the form of a Mission, Vision, and Key Principles have remained largely unchanged since the inception of AMTEX in March of 1993. The policies define the primary roles and public accountabilities of the AMTEX participants whether in government, industry, or federal research laboratories. The organizational structure and procedures of AMTEX have evolved as better ways were found to implement and fulfill the intent of the Mission, Vision, and Key Principles. This document describes the policies and procedures of the AMTEX Partnership{trademark} as approved by the AMTEX Operating Committee on July 20, 1995. It supersedes all previous AMTEX policies and procedures.

  2. Final Technical Report

    SciTech Connect (OSTI)

    Peter McIntyre

    2006-08-16

    successive models. Each new model will incorporate a particular design element that we wish to evaluate: first the basic TAMU3 structure, then substitute one pancake using high-performance superconductor (3,000 A/mm2 @ 12 T, 4.2 K), then substitute one pancake using mixed-strand cable, then insert a steel nose to reduce the peak field in the end region of a single-pancake coil. While we are building and testing this succession of TAMU3 models we will de-velop the tooling and evaluate strategies for flaring the ends of the center double-pancake coil needed for.TAMU4. TAMU4 is a full implementation of the design, culminating in 14 Tesla performance. Pending the proposed increase of budget from the present 3-year-flat budget and providing that the tests of each model dipole do not lead to substantial modifications of the de-sign, the time to build and test each succeeding model could be ~9 months. During the present funding year we made a sequence of innovations that have major poten-tial benefit for the commissioning of LHC, upgrade of its luminosity, and its long-term future: • An electrode assembly, suitable for integration within the existing LHC dipoles, ca-pable of killing the electron cloud effect – an effect that threatens to limit the lumi-nosity that could be attained in LHC; • A Nb3Sn structured cable, which makes it possible to design very high gradient quadrupoles for upgrade of the interaction regions of LHC to enhance its luminosity; • A Nb3Sn/NbTi levitated-pole dipole for use in the D1 bends that combine and sepa-rate the beams at the intersection regions. The levitated-pole design uniquely solves the problems of radiation damage and heating from particles swept from the beam. • A hybrid dipole technology, in which inner windings of Bi-2212 are integrated in a Nb3Sn block-coil dipole to push to 24 Tesla, opening the possibility of a future trip-ler upgrade of LHC .

  3. Final ECR 2008 Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final ECR 2008 Report Final ECR 2008 Report Final ECR 2008 Report Environmental Conflict Resolution Third Annual Report January 2009 (224.55 KB) More Documents & Publications Environmental Conflict Resolution 2009 ECR FINAL REPORT 2010 test

  4. Final Technical Report

    SciTech Connect (OSTI)

    Stenzel, Reiner; Urrutia, J. Manuel

    2009-09-08

    emissions are only observed in whistler spheromaks and FRCs but not in mirrors or asymmetric configurations lacking magnetic null lines. The collisionless electron energization in a toroidal null line usually produces non-Maxwellian distributions. Off the null axis electrons gain more perpendicular than parallel energy. Distributions with T{sub {perpendicular}} > T{sub {parallel}} lead to whistler instabilities which have been observed. A whistler spheromak is a source of high-frequency whistler emissions. These are usually small amplitude whistlers propagating in a complicated background magnetic field. The waves are emitted from a moving source. High frequency whistlers propagate faster than the spheromak, thus partly move ahead of it and partly in the reverse direction. In test wave experiments wave growth opposite to the direction of the hot electron flow has been observed, confirming that Doppler-shifted cyclotron resonance instabilities account for the emission process. Propagating whistler mirrors produce no significant instabilities except when they interact with other fields which exhibit null lines. For example, a whistler mirror has been launched against a stationary FRC, resulting in strong FRC heating and whistler instabilities. In the whistler mirror configuration the antenna near-zone field produces a toroidal null line outside the coil which can also become a source for whistler emissions. Finally, nonlinear EMHD research has been extended to initially unmagnetized plasmas where a new nonlinear skin depth has been discovered. When a small-amplitude oscillating magnetic field is applied to a plasma the field penetration is governed by the skin depth, collisional or collisionless depending on frequency, collision frequency and plasma frequency. However, when the magnetic field increases the electrons become magnetized and the field penetration occurs in the whistler mode if the cyclotron frequency exceeds the oscillating frequency. This phenomenon has been

  5. Test Procedure Waivers | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appliance & Equipment Standards » Rulemakings & Notices » Test Procedure Waivers Test Procedure Waivers Products covered by standards change as manufacturers add new features to their products and update designs in order to compete for consumers. Innovation and product development occasionally causes products to change in ways that either (1) make the results of a test procedure unrepresentative of actual energy use or efficiency, or (2) make it impossible to test in accordance with

  6. Quality Procedure - Records Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Records Management Quality Procedure - Records Management This procedure establishes the responsibilities and process for identifying and managing records, including quality records, generated by EM Headquarters Office of Standards and Quality Assurance personnel as well as Office of Standards and Quality Assurance representatives located in DOE EM Field Offices in accordance with EM-QA-001, Environmental Management Quality Assurance Program. Quality Procedure - Records Management (2.32 MB) More

  7. DOE Reasonable Accommodation Procedures | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Reasonable Accommodation Procedures DOE Reasonable Accommodation Procedures Pursuant to Executive Order 13164, the Department of Energy (hereinafter referred to as the "department"), is charged with establishing written procedures for the facilitation of reasonable accommodation for: (1) individuals with disabilities in the application process for employment with the Department; (2) Department employees with disabilities to perform the essential functions of a position; and (3)

  8. Delegation Procedures - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Breadcrumb >> Breadcrumb Delegation Procedures by Website Administrator Text version is available here. Delegation Procedures Re-Delegation Procedures Document Actions Proposing New Delegations Redelegating Existing Delegations Proposing an Amendment Rescinding a Delegation Delegation is Not Needed Proposing New Delegations When proposing a Delegation of Authority, the delegation must include the following as a minimum: Citation of the original source of authority (i.e. statue, executive

  9. Postdoctoral Extension Procedures | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Extension Procedures The Postdoctoral Office at DEP is responsible for processing the postdoctoral appointment extensions. It is important that all Argonne programmatic divisions understand and follow the protocol established to that effect. This document summarizes the procedures and intends to clarify some questions, thus avoiding delays in the process. The procedure, already accepted by the ALD offices across the Laboratory, is as follows: DEP will indicate to the Divisions (two months in

  10. Postdoctoral Hiring Procedures | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hiring Procedures The Postdoctoral Office at DEP coordinates and facilitates the application, review, and hiring procedures for all postdoctoral candidates, following the guidelines established by Argonne policies. It is important that all ANL programmatic divisions understand and follow the protocol established to hiring postdoctoral appointees. This document summarizes the procedures for hiring a Division postdoctoral appointee and intends to clarify some questions, thus avoiding delays in the

  11. Policies and Procedures | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services » Communication & Engagement » EM SSAB » Policies and Procedures Policies and Procedures The purpose of this document is to provide guidance regarding the operation of the Environmental Management Site-Specific Advisory Board (EM SSAB or Board). Policies and Procedures (406.85 KB) More Documents & Publications Memorandum: Regarding Delegation of Designated Federal Officials for Site Specific Advisory Boards DOE Manual - ADVISORY COMMITTEE MANAGEMENT PROGRAM GSA Federal

  12. APEC-Alternative Transport Fuels: Implementation Guidelines ...

    Open Energy Info (EERE)

    APEC-Alternative Transport Fuels: Implementation Guidelines Jump to: navigation, search Tool Summary LAUNCH TOOL Name: APEC-Alternative Transport Fuels: Implementation Guidelines...

  13. Building America Expert Meeting: Retrofit Implementation - A...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Retrofit Implementation - A Neighborhood at a Time Building America Expert Meeting: Retrofit Implementation - A Neighborhood at a Time This report provides information about a ...

  14. Oregon Nonpoint Source Program Implementation Webpage | Open...

    Open Energy Info (EERE)

    Implementation Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Oregon Nonpoint Source Program Implementation Webpage Abstract Provides...

  15. Federal Sector Renewable Energy Project Implementation: ""What...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sector Renewable Energy Project Implementation: ""What's Working and Why Federal Sector Renewable Energy Project Implementation: ""What's Working and Why Presentation by Robert ...

  16. Financing Project Implementation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Financing Project Implementation (August 11, 2010) (841.2 KB) More Documents & Publications Measuring Energy Achievements Preparing for Project Implementation during an Energy ...

  17. Template Implementing Agreement | Open Energy Information

    Open Energy Info (EERE)

    Not provided DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Template Implementing Agreement Citation Template Implementing Agreement...

  18. Financing Program Design and Implementation Considerations

    Broader source: Energy.gov [DOE]

    Designing and implementing clean energy financing programs takes more than simply identifying applicable financing structures and implementing them. State and local governments should also take...

  19. Validation Data Plan Implementation: Subcooled Flow Boiling

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Validation Data Plan Implementation: Subcooled Flow Boiling Case Study Anh Bui and Nam ... INLMIS-12-27303 September 2012 Validation Data Plan Implementation: Subcooled Flow ...

  20. Preparing for Project Implementation Motivating Employees to...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Implement Projects Save Energy Now LEADER Web Conference Project Implementation Seminar Series Save Energy Now LEADER Web Conference Agenda Seminar Series Overview ...

  1. Preparing for Project Implementation Announcing "the PRIZE",...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    July 14, 2010 8 - Preparing for Project Implementation Announcing "the PRIZE" Save Energy Now LEADER Web Conference Project Implementation Seminar Series Save Energy Now LEADER Web ...

  2. Preparing for Project Implementation: Providing Resources for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Implementation Save Energy Now LEADER Web Conference Project Implementation Seminar Series Save Energy Now LEADER Web Conference Agenda Seminar Series Overview ...

  3. Tools for Designing & Implementing Better Finance Programs |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Tools for Designing & Implementing Better Finance Programs Tools for Designing & Implementing Better Finance Programs Clean energy finance programs PDF icon Presentation Microsoft ...

  4. EIS-0481: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Final Programmatic Environmental Impact Statement EIS-0481: Final Programmatic Environmental Impact Statement Engineered High Energy Crop Programs Programmatic Environmental ...

  5. Memorandum, Interim Procedures During Temporary Suspension of...

    Broader source: Energy.gov (indexed) [DOE]

    hiring, credentialing and eligibility determinations during the period of e-QIP suspension. Memorandum, Interim Procedures During Temporary Suspension of Electronic...

  6. Transesterification: Laboratory Analytical Procedure (LAP) Van...

    Office of Scientific and Technical Information (OSTI)

    Wychen, S.; Laurens, L. M. L. 09 BIOMASS FUELS; 59 BASIC BIOLOGICAL SCIENCES BIOMASS; ALGAE; LABORATORY ANALYTICAL PROCEDURES; LAPS; TOTAL LIPIDS; FATTY ACID METHYL ESTERS; FAME;...

  7. Hazardous Material Packaging for Transport - Administrative Procedures

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1986-09-30

    To establ1sh administrative procedures for the certification and use of radioactive and other hazardous materials packaging by the Department of Energy (DOE).

  8. Additional Guidance Regarding Application of Current Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Additional Guidance Regarding Application of Current Procedures for Testing Energy Consumption of Clothes Washers with Warm Rinse Cycles, Issued: June 30, 2010 Additional Guidance...

  9. Generation Interconnection and Deliverability Allocation Procedures...

    Open Energy Info (EERE)

    Interconnection and Deliverability Allocation Procedures Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Permit ApplicationPermit Application:...

  10. Records Management Exit Procedures | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    on a permanent basis or for an extended period of time for military, medical, or disability leave. PDF icon Records Management Exit Procedures More Documents & Publications ...

  11. Energy Impact Illinois - Final Technical Report

    SciTech Connect (OSTI)

    Olson, Daniel; Plagman, Emily; Silberhorn, Joey-Lin

    2014-02-18

    Energy Impact Illinois (EI2) is an alliance of government organizations, nonprofits, and regional utility companies led by the Chicago Metropolitan Agency for Planning (CMAP) that is dedicated to helping communities in the Chicago metropolitan area become more energy efficient. Originally organized as the Chicago Region Retrofit Ramp-Up (CR3), EI2 became part of the nationwide Better Buildings Neighborhood Program (BBNP) in May 2010 after receiving a $25 million award from the U.S. Department of Energy (DOE) authorized through the American Recovery and Reinvestment Act of 2009 (ARRA). The program’s primary goal was to fund initiatives that mitigate barriers to energy efficiency retrofitting activities across residential, multifamily, and commercial building sectors in the seven-county CMAP region and to help to build a sustainable energy efficiency marketplace. The EI2 Final Technical Report provides a detailed review of the strategies, implementation methods, challenges, lessons learned, and final results of the EI2 program during the initial grant period from 2010-2013. During the program period, EI2 successfully increased direct retrofit activity in the region and was able to make a broader impact on the energy efficiency market in the Chicago region. As the period of performance for the initial grant comes to an end, EI2’s legacy raises the bar for the region in terms of helping homeowners and building owners to take action on the continually complex issue of energy efficiency.

  12. AVTA: Hybrid Electric Vehicle Specifications and Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hybrid Electric Vehicle Specifications and Test Procedures AVTA: Hybrid Electric Vehicle Specifications and Test Procedures Fleet Test and Evaluation Procedure (231.85 KB) ...

  13. Bio-Oil Analysis Laboratory Procedures | Bioenergy | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bio-Oil Analysis Laboratory Procedures NREL develops laboratory analytical procedures ... These standard procedures have been validated and allow for reliable bio-oil analysis. ...

  14. Procedures for Public Release of Data | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procedures for Public Release of Data Procedures for Public Release of Data Procedures for Public Release of Data All Department of Energy (DOE) data owners should follow the ...

  15. Final Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement Summary and Guide for Stakeholders

    SciTech Connect (OSTI)

    Not Available

    2011-01-01

    Pursuant to the Mercury Export Ban Act of 2008 (P.L. 110-414), DOE was directed to designate a facility or facilities for the long-term management and storage of elemental mercury generated within the United States. Therefore, DOE has analyzed the storage of up to 10,000 metric tons (11,000 tons) of elemental mercury in a facility(ies) constructed and operated in accordance with the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (74 FR 31723). DOE prepared this Final Mercury Storage EIS in accordance with the National Environmental Policy Act of 1969 (NEPA), as amended (42 U.S.C. 4321 et seq.), the Council on Environmental Quality (CEQ) implementing regulations (40 CFR 1500–1508), and DOE’s NEPA implementing procedures (10 CFR 1021) to evaluate reasonable alternatives for a facility(ies) for the long-term management and storage of elemental mercury. This Final Mercury Storage EIS analyzes the potential environmental, human health, and socioeconomic impacts of elemental mercury storage at seven candidate locations: Grand Junction Disposal Site near Grand Junction, Colorado; Hanford Site near Richland, Washington; Hawthorne Army Depot near Hawthorne, Nevada; Idaho National Laboratory near Idaho Falls, Idaho; Kansas City Plant in Kansas City, Missouri; Savannah River Site near Aiken, South Carolina; and Waste Control Specialists, LLC, site near Andrews, Texas. As required by CEQ NEPA regulations, the No Action Alternative was also analyzed as a basis for comparison. DOE intends to decide (1) where to locate the elemental mercury storage facility(ies) and (2) whether to use existing buildings, new buildings, or a combination of existing and new buildings. DOE’s Preferred Alternative for the long-term management and storage of mercury is the Waste Control Specialists, LLC, site near Andrews, Texas.

  16. Digital revenue metering algorithm: development, analysis, implementation, testing, and evaluation. Final report

    SciTech Connect (OSTI)

    Schweitzer III, E.O.; To, H.W.; Ando, M.

    1980-11-01

    A digital revenue metering algorithm is described. The algorithm has been tested in a microcomputer system using two 8-bit MC6800 microprocessors and 12-bit analog-to-digital converters. The tests show that the system meets the accuracy requirements of ANSI C12-1975. The algorithm demands modest computing requirements and low data sampling rates. The algorithm uses Walsh-functions and will operate with as few as 4 samples per 60-Hz cycle. For proper response to odd harmonic frequencies, higher sampling rates must be used. Third harmonic power can be handled with an 8-sample per cycle Walsh function. However, even harmonics are effectively suppressed by the algorithm. The developed algorithm is intended for use in digital data acquisition systems for substations where interchange metering is required.

  17. I-SAVE conservation program. Implementing title II of NECPA residential conservation service. Final draft

    SciTech Connect (OSTI)

    1980-05-30

    The I-SAVE (Iowa Saves America's Vital Energy) conservation plan provides comprehensive energy-conservation information and services to residential consumers served by large investor-owned electric and gas utilities and participating home-heating suppliers. The overall objective of the I-SAVE plan is to conserve energy by facilitating cost-effective retrofit of existing housing and promoting more-efficient energy use. The ultimate benefit available to the customer under the I-SAVE plan - reduction in energy use - is dependent upon the action he or she takes as a result of the program audit. Benefits to the utility and the ratepayers as a whole, however, will accrue only upon widespread customer acceptance and utilization of program services. This degree of program acceptance and the resulting benefits to ratepayers can be attained only through an aggressive educational and promotional effort by the covered utilities. All electric and gas utilities which have sales, other than resale, exceeding 750 million kWh of electricity or 10 billion cubic feet of gas and participating home-heating suppliers, shall provide a program announcement and shall offer conservation services to their customers who occupy a residential building containing at least one, but not more than four units, in a manner as provided by the rules. The text of the rules is presented. (MCW)

  18. Anaerobic fermentation of agricultural residue: potential for improvement and implementation. Final report, Volume II

    SciTech Connect (OSTI)

    Jewell, W. J.; Dell'orto, S.; Fanfoni, K. J.; Hayes, T. D.; Leuschner, A. P.; Sherman, D. F.

    1980-04-01

    Earlier studies have shown that although large quantities of agricultural residues are generated on small farms, it was difficult to economically justify use of conventional anaerobic digestion technology, such as used for sewage sludge digestion. A simple, unmixed, earthen-supported structure appeared to be capable of producing significant quantities of biogas at a cost that would make it competitive with many existing fuels. The goal of this study was to define and demonstrate a methane fermentation technology that could be practical and economically feasible on small farms. This study provides the first long term, large scale (reactor volumes of 34 m/sup 3/) parallel testing of the major theory, design, construction, and operation of a low cost approach to animal manure fermentation as compared to the more costly and complex designs. The main objectives were to define the lower limits for successful fermentor operation in terms of mixing, insulation, temperature, feed rate, and management requirements in a cold climate with both pilot scale and full scale fermentors. Over a period of four years, innovative fermentation processes for animal manures were developed from theoretical concept to successful full scale demonstration. Reactors were sized for 50 to 65 dairy animals, or for the one-family dairy size. The results show that a small farm biogas generation system that should be widely applicable and economically feasible was operated successfully for nearly two years. Although this low cost system out-performed the completely mixed unit throughout the study, perhaps the greatest advantage of this approach is its ease of modification, operation, and maintenance.

  19. Hawaii Clean Energy Final PEIS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A 1 2 Public Notices 3 Notices about the Draft Programmatic EIS Appendix A Hawai i Clean Energy Final PEIS A-1 September 2015 DOE/EIS-0459 The following Notice of Availability appeared in the Federal Register on April 18, 2014. Appendix A Hawai i Clean Energy Final PEIS A-2 September 2015 DOE/EIS-0459 Appendix A Hawai i Clean Energy Final PEIS A-3 September 2015 DOE/EIS-0459 DOE-Hawaii placed the following advertisement in The Garden Island on May 5 and 9, 2014. Appendix A Hawai i Clean Energy

  20. Final_Poneman_Testimony.pdf

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    that nuclear power's contribution as a reliable source of safe and secure clean, carbon-free nuclear energy in the United States will be further enhanced by implementing the...

  1. Mechanical integrity implementation and related process safety management elements

    SciTech Connect (OSTI)

    Hudson, K.M. [General Physics Corp., San Diego, CA (United States)

    1995-12-31

    The OSHA Process Safety Management (PSM) rule requires covered facilities to establish a mechanical integrity (MI) program. The MI program must address an ongoing effort to maintain the integrity of process equipment and safety systems by providing written procedures, training, inspection and testing, and quality assurance. Development of an MI program requires information from other PSM elements such as equipment process safety information and employee participation as building blocks for the program. Information obtained from other elements of PSM can be used as the basis for inspection and testing, frequency of testing, written maintenance procedures, training of maintenance personnel, and quality assurance of spare parts and newly installed equipment. This paper presents highlights in the implementation of a mechanical integrity program. A description of the use of process safety information and baseline inspections is detailed with appropriate examples. The MI program stems from an initial documentation review, and culminates in a completely functional MI program in compliance with the regulation.

  2. Pollutant Assessments Group Procedures Manual: Volume 1, Administrative and support procedures

    SciTech Connect (OSTI)

    Not Available

    1992-03-01

    This manual describes procedures currently in use by the Pollutant Assessments Group. The manual is divided into two volumes: Volume 1 includes administrative and support procedures, and Volume 2 includes technical procedures. These procedures are revised in an ongoing process to incorporate new developments in hazardous waste assessment technology and changes in administrative policy. Format inconsistencies will be corrected in subsequent revisions of individual procedures. The purpose of the Pollutant Assessments Groups Procedures Manual is to provide a standardized set of procedures documenting in an auditable manner the activities performed by the Pollutant Assessments Group (PAG) of the Health and Safety Research Division (HASRD) of the Environmental Measurements and Applications Section (EMAS) at Oak Ridge National Laboratory (ORNL). The Procedures Manual ensures that the organizational, administrative, and technical activities of PAG conform properly to protocol outlined by funding organizations. This manual also ensures that the techniques and procedures used by PAG and other contractor personnel meet the requirements of applicable governmental, scientific, and industrial standards. The Procedures Manual is sufficiently comprehensive for use by PAG and contractor personnel in the planning, performance, and reporting of project activities and measurements. The Procedures Manual provides procedures for conducting field measurements and includes program planning, equipment operation, and quality assurance elements. Successive revisions of this manual will be archived in the PAG Document Control Department to facilitate tracking of the development of specific procedures.

  3. Procedures for ground-water investigations

    SciTech Connect (OSTI)

    Not Available

    1992-12-01

    This manual was developed by the Pacific Northwest Laboratory (PNL) to document the procedures used to carry out and control the technical aspects of ground-water investigations at the PNL. Ground-water monitoring procedures are developed and used in accordance with the PNL Quality Assurance Program.

  4. Procedure to Generate the MPACT Multigroup Library

    SciTech Connect (OSTI)

    Kim, Kang Seog

    2015-12-17

    The CASL neutronics simulator MPACT is under development for the neutronics and T-H coupled simulation for the light water reactor. The objective of this document is focused on reviewing the current procedure to generate the MPACT multigroup library. Detailed methodologies and procedures are included in this document for further discussion to improve the MPACT multigroup library.

  5. TMACS Test Procedure TP011: Panalarm Interface

    SciTech Connect (OSTI)

    Seghers, R.; Washburn, S.J.

    1994-05-24

    The TMACS Software Test Procedures translate the project`s acceptance criteria into test steps. The TMACS Test Plan (WHC-SD-WM-TP-148) is fulfilled when all Test Cases are approved. This Test Procedure tests the TMACS Panalarm Interface functions.

  6. LANL PDMLink Product Structure Implementation

    SciTech Connect (OSTI)

    Scully, Christopher J.

    2012-08-29

    Over the past 2 and a half years LANL has done both functionality exploration as well as production implementations of PDMLink Product Structure to control the configuration of many of the LANL Design Agency Products. Based on this experience LANL has been recommending for over a year that future product structure implementation in PDMLink do not use the two digit suffix in the number field of enterprise parts (or WTParts). The suffix will be part of one of the attributes for Part Number. Per the TBP's the two digit suffix represents a change in form, fit, or function in a part or a change in the production agency or a number of other conditions. It also denotes backward compatibility with earlier suffixed parts (see TBP 402 section 3.1).

  7. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 18, 2015 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD HEALTH, SAFETY, AND ENVIRONMENTAL PROTECTION COMMITTEE June 18, 2015 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Tank Farm Vapors Advice Response ............................................................................................................ 1 Effectiveness of

  8. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 15, 2016 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE March 15, 2016 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Environmental Restoration and Disposal Facility Vertical Expansion ......................................................... 2 Committee Business

  9. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    12, 2016 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT AND COMMUNICATION COMMITTEE April 12, 2016 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Tri-Party Agreement Public Involvement ..................................................................................................... 2 Waste Treatment and

  10. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 26, 2016 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE April 26, 2016 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Update on Plutonium Finishing Plant ........................................................................................................... 1 Leadership Workshop Preparation, FY 2017

  11. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 14, 2016 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE June 14, 2016 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Hanford Site Tour ......................................................................................................................................... 2 Status of SWOC/Rev. 9 and 8C.

  12. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    November 3, 2015 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT AND COMMUNICATION COMMITTEE November 3, 2015 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Tri-Party Agreement Agency Public Involvement ....................................................................................... 2 Waste Treatment Plant

  13. Final Report: Axion "Roadmap" Workshop

    SciTech Connect (OSTI)

    Rosenberg, Leslie J

    2013-03-19

    Final report for "Vistas in Axion Physics: A Roadmap for Theoretical and Experimental Axion Physics through 2025", which was held at the University of Washington, INT, from April 23 - 26, 2012.

  14. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Grindstaff, DOE-ORP Ginger Wireman, Ecology Sharon Braswell, MSA Steve Pfaff, DOE-ORP Hillary Johnson, EnviroIssues Abby Chazanow, EnviroIssues Final Meeting Summary Page 16 Tank ...

  15. Implementation of Metal Casting Best Practices

    SciTech Connect (OSTI)

    Eppich, Robert; Naranjo, Robert D.

    2007-01-01

    The project examined cases where metal casters had implemented ITP research results and the benefits they received due to that implementation. In cases where casters had not implemented those results, the project examined the factors responsible for that lack of implementation. The project also informed metal casters of the free tools and service offered by the ITP Technology Delivery subprogram.

  16. EERE Plans, Implementation, and Results Glossary

    Broader source: Energy.gov [DOE]

    Definitions of the office overview, plans, implementation, and results document and website categories are provided below:

  17. Photovoltaic module certification/laboratory accreditation criteria development: Implementation handbook

    SciTech Connect (OSTI)

    Osterwald, C.R.; Hammond, R.L.; Wood, B.D.; Backus, C.E.; Sears, R.L.; Zerlaut, G.A.; D`Aiello, R.V.

    1996-08-01

    This document covers the second phase of a two-part program. Phase I provided an overview of the structure and function of typical product certification/laboratory accreditation programs. This report (Phase H) provides most of the draft documents that will be necessary for the implementation of a photovoltaic (PV) module certification/laboratory accreditation program. These include organizational documents such as articles of incorporation, bylaws, and rules of procedure, as well as marketing and educational program documents. In Phase I, a 30-member criteria development committee was established to guide, review and reach a majority consensus regarding criteria for a PV certification/laboratory accreditation program. Committee members represented PV manufacturers, end users, standards and codes organizations, and testing laboratories. A similar committee was established for Phase II; the criteria implementation committee consisted of 29 members. Twenty-one of the Phase I committee members also served on the Phase II committee, which helped to provide program continuity during Phase II.

  18. Building Diagnostic Market Deployment - Final Report

    SciTech Connect (OSTI)

    Katipamula, S.; Gayeski, N.

    2012-04-30

    provided validation data sets and the WBE software tool to validate the KGS implementation. OAE diagnostician automatically detects and diagnoses problems with outdoor air ventilation and economizer operation for air handling units (AHUs) in commercial buildings using data available from building automation systems (BASs). As part of this CRADA, PNNL developed implementation documentation and provided technical support to KGS to implement the tool into their software suite. PNNL also provided validation data sets and the OAE software tool to validate the KGS implementation. Finally, as part of this CRADA project, PNNL developed new processes to automate parts of the re-tuning process and transfer those process to KGS for integration into their software product. The transfer of DOE-funded technologies will transform the commercial buildings sector by making buildings more energy efficient and also reducing the carbon footprint from the buildings. As part of the CRADA with PNNL, KGS implemented the whole building energy diagnostician, a portion of outdoor air economizer diagnostician and a number of measures that automate the identification of re-tuning measures.

  19. Environmental Programs Procedure Preparation, Revision, Review...

    Broader source: Energy.gov (indexed) [DOE]

    Phase 2 Radiological Release at the Waste Isolation Pilot Plant, Attachment F: Bibliography and References report. The documents were examined and used to develop the final report. ...

  20. Health Code Number (HCN) Development Procedure

    SciTech Connect (OSTI)

    Petrocchi, Rocky; Craig, Douglas K.; Bond, Jayne-Anne; Trott, Donna M.; Yu, Xiao-Ying

    2013-09-01

    This report provides the detailed description of health code numbers (HCNs) and the procedure of how each HCN is assigned. It contains many guidelines and rationales of HCNs. HCNs are used in the chemical mixture methodology (CMM), a method recommended by the department of energy (DOE) for assessing health effects as a result of exposures to airborne aerosols in an emergency. The procedure is a useful tool for proficient HCN code developers. Intense training and quality assurance with qualified HCN developers are required before an individual comprehends the procedure to develop HCNs for DOE.

  1. FINAL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Information Systems » FIMS Data Validation FIMS Data Validation FIMS Data Validation The Facility Information Management System (FIMS) is the Department's official repository of real property data. The Department relies on the FIMS data for real property decision-making and accounting of its $86B in assets. Maintaining accurate and credible data in FIMS is critical to efficient operations and resource planning. Department of Energy Order 430.1B Real Property Asset Management requires FIMS data

  2. Final Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement Richland, Washington

    SciTech Connect (OSTI)

    N /A

    2004-02-13

    This Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement (HSW EIS) provides environmental and technical information concerning U.S. Department of Energy (DOE) ongoing and proposed waste management practices at the Hanford Site in Washington State. The HSW EIS updates some analyses of environmental consequences from previous documents and provides evaluations for activities that may be implemented consistent with the Waste Management Programmatic Environmental Impact Statement (WM PEIS; DOE 1997c) Records of Decision (RODs). The draft HSW EIS was initially issued in April 2002 for public comment (DOE 2002b). A revised draft HSW EIS was issued in March 2003 to address new waste management alternatives that had been proposed since the initial draft HSW EIS was prepared, and to address comments received during the public review period for the first draft (DOE 2003d). The revised draft HSW EIS also incorporated alternatives for disposal of immobilized low-activity waste (ILAW) from treatment of Hanford Site tank waste in the waste treatment plant (WTP) currently under construction, an activity that was not included in the first draft (68 FR 7110). This final HSW EIS describes the DOE preferred alternative, and in response to public comments received on the March 2003 revised draft, provides additional analyses for some environmental consequences associated with the preferred alternative, with other alternatives, and with cumulative impacts. Public comments on the revised draft HSW EIS are addressed in the comment response document (Volume III of this final EIS). This HSW EIS describes the environmental consequences of alternatives for constructing, modifying, and operating facilities to store, treat, and/or dispose of low-level (radioactive) waste (LLW), transuranic (TRU) waste, ILAW, and mixed low-level waste (MLLW) including WTP melters at Hanford. In addition, the potential long-term consequences of LLW, MLLW, and ILAW disposal

  3. Final 2011 Supplement Analysis of the 2005 Final SWEIS | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration | (NNSA) Final 2011 Supplement Analysis of the 2005 Final SWEIS Final 2011 Supplement Analysis of the 2005 Final Site-wide Environmental Impact Statement for Continued Operation of LLNL The below final SUPPLEMENT ANALYSIS is available for public viewing. Final 2011 SUPPLEMENT ANALYSIS of the 2005 Final Site-wide Environmental Impact Statement for Continued Operation of Lawrence Livermore National Laboratory Below are links to the final comments response and final

  4. Phenomenological implementations of TMD evolution

    SciTech Connect (OSTI)

    Boglione, Mariaelena; Gonzalez Hernandez, Jose Osvaldo; Melis, Stefano; Prokudin, Alexey

    2015-03-01

    Although the theoretical set-up of TMD evolution appears to be well established, its phenomenological implementations still require special attention, particularly as far as the interplay between perturbative and non-perturbative contributions is concerned. These issues have been extensively studied in Drell-Yan processes, where they seem to be reasonably under control. Instead, applying the same prescriptions and methodologies to Semi-Inclusive Deep Inelastic (SIDIS) processes is, at present, far from obvious. Some of the controversies related to the applications of TMD Evolution to SIDIS processes will be discussed with practical examples, exploring different kinematical configurations of SIDIS experiments.

  5. A Schwarz alternating procedure for singular perturbation problems

    SciTech Connect (OSTI)

    Garbey, M.; Kaper, H.G.

    1994-12-31

    The authors show that the Schwarz alternating procedure offers a good algorithm for the numerical solution of singular perturbation problems, provided the domain decomposition is properly designed to resolve the boundary and transition layers. They give sharp estimates for the optimal position of the domain boundaries and present convergence rates of the algorithm for various second-order singular perturbation problems. The splitting of the operator is domain-dependent, and the iterative solution of each subproblem is based on a modified asymptotic expansion of the operator. They show that this asymptotic-induced method leads to a family of efficient massively parallel algorithms and report on implementation results for a turning-point problem and a combustion problem.

  6. DOE Launches Public Test Procedure Guidance Website

    Broader source: Energy.gov [DOE]

    The Department of Energy this week launched a new online database offering guidance on the Department’s test procedures for appliances and commercial equipment.  The new database will provide a...

  7. Financial Policy and Procedures for Reimbursable Work

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1988-08-15

    The directive establishes Department-wide financial policy and procedural guidance applicable to performing reimbursable work for other Federal agencies and with non-Federal Government entities, including foreign and commercial entities, State, and political subdivisions.

  8. Quality Procedure- Causal Analysis and Trending

    Broader source: Energy.gov [DOE]

    This Quality Procedure describes the process for reviewing and analyzing the cause(s) of issues and findings identified from the Office of Quality Assurance oversight activities and reporting trends as a result of this review.

  9. Department of Energy Technical Standards Procedures | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The following procedures should be used to write, revise, or maintain a DOE technical standard. They are also used to convert a DOE technical standard to a non-government standard ...

  10. Atomic memory access hardware implementations

    SciTech Connect (OSTI)

    Ahn, Jung Ho; Erez, Mattan; Dally, William J

    2015-02-17

    Atomic memory access requests are handled using a variety of systems and methods. According to one example method, a data-processing circuit having an address-request generator that issues requests to a common memory implements a method of processing the requests using a memory-access intervention circuit coupled between the generator and the common memory. The method identifies a current atomic-memory access request from a plurality of memory access requests. A data set is stored that corresponds to the current atomic-memory access request in a data storage circuit within the intervention circuit. It is determined whether the current atomic-memory access request corresponds to at least one previously-stored atomic-memory access request. In response to determining correspondence, the current request is implemented by retrieving data from the common memory. The data is modified in response to the current request and at least one other access request in the memory-access intervention circuit.

  11. Implementation of global energy sustainability

    SciTech Connect (OSTI)

    Grob, G.R.

    1998-02-01

    The term energy sustainability emerged from the UN Conference on Environment and Development in Rio 1992, when Agenda 21 was formulated and the Global Energy Charter proclaimed. Emission reductions, total energy costing, improved energy efficiency, and sustainable energy systems are the four fundamental principles of the charter. These principles can be implemented in the proposed financial, legal, technical, and education framework. Much has been done in many countries toward the implementation of the Global Energy Charter, but progress has not been fast enough to ease the disastrous effects of the too many ill-conceived energy systems on the environment, climate, and health. Global warming is accelerating, and pollution is worsening, especially in developing countries with their hunger for energy to meet the needs of economic development. Asian cities are now beating all pollution records, and greenhouse gases are visibly changing the climate with rising sea levels, retracting glaciers, and record weather disasters. This article presents why and how energy investments and research money have to be rechanneled into sustainable energy, rather than into the business-as-usual of depleting, unsustainable energy concepts exceeding one trillion dollars per year. This largest of all investment sectors needs much more attention.

  12. Export Authorizations - Procedures | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Export Authorizations - Procedures Export Authorizations - Procedures Part II, Section 202(e) of the Federal Power Act (FPA) states that exports of electric energy should be allowed unless the proposed export would impair the sufficiency of electric power supply within the U.S. or would impede or tend to impede the coordinated use of the U.S. power supply network. Based on these guidelines, DOE will grant authorization to export electric energy if it is determined that: 1.Sufficient generating

  13. Presidential Permits - Procedures | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Permits - Procedures Presidential Permits - Procedures Executive Order 12038 states that, before a Presidential permit may be issued, the action must be found to be consistent with the public interest. The two criteria used by DOE to determine if a proposed project is consistent with the public interest are: Environmental Impact - The National Environmental Policy Act of 1969 (NEPA) requires that Federal agencies give due consideration to the environmental consequences of their actions. Pursuant

  14. DNS Policies & Procedures | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DNS Policies & Procedures DNS Policies & Procedures DNS Policy Every Federal agency must use only .gov, .mil, or Fed.us domains unless the agency head explicitly determines another domain is necessary for the proper performance of an agency function. Why is this important? Visitors looking for official government information must be confident that is what they are getting. Many websites exist that resemble government websites or that appear to provide "official" government

  15. Quality Procedure - Independent Assessments | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Assessments Quality Procedure - Independent Assessments This procedure establishes the process for planning, performing, and reporting Independent Assessments (i.e., assist visits, program/project reviews, direct observations, etc.) as conducted by the Office of Standards and Quality Assurance. Independent assessments are performed at EM Headquarters and Field Offices to determine compliance to requirements and to identify systemic issues, potential risk, emerging issues, and for

  16. Quality Procedure - Lessons Learned | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lessons Learned Quality Procedure - Lessons Learned The purpose of this Quality Procedure is to assist the Office of Standards and Quality Assurance personnel during the execution and operation of its activities, specifically in oversight activities, to compile and disseminate information related to lessons learned. The purpose of lessons learned is to share and use knowledge derived from experience to promote the recurrence of desirable outcomes, or preclude the recurrence of undesirable

  17. Hanford Site Confined Space Procedure (HSCSP)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    60 Revision 1 Hanford Site Confined Space Procedure (HSCSP) Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management Approved for Public Release; Further Dissemination Unlimited DOE-0360, Rev. 1 Hanford Site Confined Space Procedure (HSCSP) Published Date: 09/16/2015 Effective Date: 10/02/2015 ii CHANGE SUMMARY Minor changes made to format, grammar, and word choice in order to enhance consistency and readability. Section Change Details Signature Page Changed

  18. Final Design RM | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Design RM Final Design RM The Final Design (FD) Review Module (RM) is a tool that assists Department of Energy (DOE) federal project review teams in evaluating the technical ...

  19. Final alternatives assessment: Other contamination sources: Interim response action, South Tank Farm Plume. Final report

    SciTech Connect (OSTI)

    Not Available

    1990-08-01

    The South Tank Farm Plume (STFP) is located in the southern half of sections 1 and 2. It is a composite plume of C6H6, MEC6H5, XYLEN, DCPD, and BCHPD which is migrating from the area of tank 464A. Recent investigations have shown that the STFP is being biodegraded naturally and will not migrate into either Lake Ladora or Lower Derby Lake prior to implementation of the final remedy. Monitoring with the specific objectives of (1) Verifying the rate of migration and (2) Locating the leading edge of the plume over the time frame of the IRA is proposed as the preferred alternative action. Sections of this assessment provide information on: (1) Site description-history, previous investigations, hydrogeology, LNAPL plume; (2) IRA objectives and evaluation; and (3) Work plan of the IRA-well network, sampling frequency. Appendices include comments and responses.

  20. MINIMARS conceptual design: Final report

    SciTech Connect (OSTI)

    Lee, J.D.

    1986-09-01

    This volume contains the following sections: (1) fueling systems; (2) blanket; (3) alternative blanket concepts; (4) halo scraper/direct converter system study and final conceptual design; (5) heat-transport and power-conversion systems; (6) tritium systems; (7) minimars air detritiation system; (8) appropriate radiological safety design criteria; and (9) cost estimate. (MOW)

  1. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 15, 2016 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD TANK WASTE COMMITTEE March 15, 2016 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Waste Treatment Plant (WTP) Progress and Communication Approach (Joint w/PIC) .............................. 2 Issue Manager Update on Cesium Management Resulting from Low Activity Waste

  2. BP-12 Final Models Datasets

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MB, XLS) Tier 2 Module of RAM RAM Tier 2 Pricing Module (4.8 MB, XLS) Tool Kit Files (TPP) ToolKit v4.8.1 BP-12 Final Studies Release 4-Aug-11 (12.5 MB, XLS) Risk Mod Output...

  3. Microsoft Word - Abengoa Final EA

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    683 FINAL ENVIRONMENTAL ASSESSMENT FOR DEPARTMENT OF ENERGY LOAN GUARANTEE TO ABENGOA SOLAR INC. FOR THE SOLANA THERMAL ELECTRIC POWER PROJECT NEAR GILA BEND, ARIZONA U.S. Department of Energy Loan Guarantee Program Office Washington, DC 20585 May 2010 DOE/EA-1683 i CONTENTS Acronynms and Abbreviations ................................................................................................. viii SUMMARY

  4. Final Rule (October 23, 2007)

    Broader source: Energy.gov [DOE]

    Loan Guarantees for Projects That Employ Innovative Technologies; Final Rule: On May 16, 2007, the Department of Energy (DOE or the Department) published a Notice of Proposed Rulemaking and opportunity for comment (NOPR) to establish regulations for the loan guarantee program authorized by Title XVII of the Energy Policy Act of 2005 (Title XVII or the Act).

  5. Convective Radio Occultations Final Campaign Summary (Technical...

    Office of Scientific and Technical Information (OSTI)

    Convective Radio Occultations Final Campaign Summary Citation Details In-Document Search Title: Convective Radio Occultations Final Campaign Summary Deep convective systems are ...

  6. Biofuels Report Final | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Biofuels Report Final Biofuels Report Final Liquid biofuels produced from lignocellulosic biomass can significantly reduce our dependence on foreign oil, create new jobs, improve ...

  7. EIS-0161: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    61: Final Programmatic Environmental Impact Statement EIS-0161: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain ...

  8. EIS-0229: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Programmatic Environmental Impact Statement EIS-0229: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain ...

  9. ERDA-1537: Final Environmental Impact Statement | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ERDA-1537: Final Environmental Impact Statement ERDA-1537: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on ...

  10. EIS-0269: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    69: Final Programmatic Environmental Impact Statement EIS-0269: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain ...

  11. Ocean Thermal Extractable Energy Visualization: Final Technical...

    Office of Environmental Management (EM)

    Ocean Thermal Extractable Energy Visualization: Final Technical Report Ocean Thermal Extractable Energy Visualization: Final Technical Report Report about the Ocean Thermal ...

  12. Acceptance Test Procedure: SY101 air pallet system

    SciTech Connect (OSTI)

    Koons, B.M.

    1995-05-30

    The purpose of this test procedure is to verify that the system(s) procured to load the SY-101 Mitigation Test Pump package fulfills its functional requirements. It will also help determine the man dose expected due to handling of the package during the actual event. The scope of this procedure focuses on the ability of the air pallets and container saddles to carry the container package from the new 100 foot concrete pad into 2403-WD where it will be stored awaiting final disposition. This test attempts to simulate the actual event of depositing the SY-101 hydrogen mitigation test pump into the 2403-WD building. However, at the time of testing road modifications required to drive the 100 ton trailer into CWC were not performed. Therefore a flatbed trailer will be use to transport the container to CWC. The time required to off load the container from the 100 ton trailer will be recorded for man dose evaluation on location. The cranes used for this test will also be different than the actual event. This is not considered to be an issue due to minimal effects on man dose.

  13. New Servers Implemented | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    New Servers Implemented Cyber Train Changes have been made to the implementation of Cyber Train. More information about how to acces Cyber Train from either on or off site can be...

  14. Implementation Plan Template - DOE Directives, Delegations, and

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Implementation Plan Template by Website Administrator application/vnd.openxmlformats-officedocument.wordprocessingml.document icon Implementation Plan Template.docx - application/vnd.openxmlformats-officedocument.wordprocessingml.document, 12 KB (1256

  15. FINAL REPORT: Transformational electrode drying process

    SciTech Connect (OSTI)

    Claus Daniel, C.; Wixom, M.

    2013-12-19

    This report includes major findings and outlook from the transformational electrode drying project performance period from January 6, 2012 to August 1, 2012. Electrode drying before cell assembly is an operational bottleneck in battery manufacturing due to long drying times and batch processing. Water taken up during shipment and other manufacturing steps needs to be removed before final battery assembly. Conventional vacuum ovens are limited in drying speed due to a temperature threshold needed to avoid damaging polymer components in the composite electrode. Roll to roll operation and alternative treatments can increase the water desorption and removal rate without overheating and damaging other components in the composite electrode, thus considerably reducing drying time and energy use. The objective of this project was the development of an electrode drying procedure, and the demonstration of processes with no decrease in battery performance. The benchmark for all drying data was an 80°C vacuum furnace treatment with a residence time of 18 – 22 hours. This report demonstrates an alternative roll to roll drying process with a 500-fold improvement in drying time down to 2 minutes and consumption of only 30% of the energy compared to vacuum furnace treatment.

  16. Lightning arrestor connector lead magnesium niobate qualification pellet test procedures.

    SciTech Connect (OSTI)

    Tuohig, W.; Mahoney, Patrick A.; Tuttle, Bruce Andrew; Wheeler, Jill Susanne

    2009-02-01

    Enhanced knowledge preservation for DOE DP technical component activities has recently received much attention. As part of this recent knowledge preservation effort, improved documentation of the sample preparation and electrical testing procedures for lead magnesium niobate--lead titanate (PMN/PT) qualification pellets was completed. The qualification pellets are fabricated from the same parent powders used to produce PMN/PT lightning arrestor connector (LAC) granules at HWF&T. In our report, the procedures for fired pellet surface preparation, electrode deposition, electrical testing and data recording are described. The dielectric measurements described in our report are an information only test. Technical reasons for selecting the electrode material, electrode size and geometry are presented. The electrical testing is based on measuring the dielectric constant and dissipation factor of the pellet during cooling from 280 C to 220 C. The most important data are the temperature for which the peak dielectric constant occurs (Curie Point temperature) and the peak dielectric constant magnitude. We determined that the peak dielectric constant for our procedure would be that measured at 1 kHz at the Curie Point. Both the peak dielectric constant and the Curie point parameters provide semi-quantitative information concerning the chemical and microstructural homogeneity of the parent material used for the production of PMN/PT granules for LACs. Finally, we have proposed flag limits for the dielectric data for the pellets. Specifically, if the temperature of the peak dielectric constant falls outside the range of 250 C {+-} 30 C we propose that a flag limit be imposed that will initiate communication between production agency and design agency personnel. If the peak dielectric constant measured falls outside the range 25,000 {+-} 10,000 we also propose that a flag limit be imposed.

  17. Revenue recycling: an implementation plan

    SciTech Connect (OSTI)

    Kelman, S.

    1983-01-01

    This is an implementation plan for an energy emergency assistance program that would provide a check, an energy emergency assistance payment, to all individual Americans whom Congress determined to be eligible for participation. Using a relatively modest number of already available lists, it would be possible to get checks sent to essentially every non-minor individual who is currently working, unemployed, retired, disabled, or receiving AFDC. The system presented accounts for essentially 100% of the over-18 population of the US. The author believes that the checks can all have been mailed out to eligible individuals within three months (or sooner) of the decision to proceed with the program at the time of an emergency - with, of course, many eligible individuals receiving thier checks much earlier than that.

  18. Diamond turning machine controller implementation

    SciTech Connect (OSTI)

    Garrard, K.P.; Taylor, L.W.; Knight, B.F.; Fornaro, R.J.

    1988-12-01

    The standard controller for a Pnuemo ASG 2500 Diamond Turning Machine, an Allen Bradley 8200, has been replaced with a custom high-performance design. This controller consists of four major components. Axis position feedback information is provided by a Zygo Axiom 2/20 laser interferometer with 0.1 micro-inch resolution. Hardware interface logic couples the computers digital and analog I/O channels to the diamond turning machine`s analog motor controllers, the laser interferometer, and other machine status and control information. It also provides front panel switches for operator override of the computer controller and implement the emergency stop sequence. The remaining two components, the control computer hardware and software, are discussed in detail below.

  19. Energy efficient sensor network implementations

    SciTech Connect (OSTI)

    Frigo, Janette R; Raby, Eric Y; Brennan, Sean M; Kulathumani, Vinod; Rosten, Ed; Wolinski, Christophe; Wagner, Charles; Charot, Francois

    2009-01-01

    In this paper, we discuss a low power embedded sensor node architecture we are developing for distributed sensor network systems deployed in a natural environment. In particular, we examine the sensor node for energy efficient processing-at-the-sensor. We analyze the following modes of operation; event detection, sleep(wake-up), data acquisition, data processing modes using low power, high performance embedded technology such as specialized embedded DSP processors and a low power FPGAs at the sensing node. We use compute intensive sensor node applications: an acoustic vehicle classifier (frequency domain analysis) and a video license plate identification application (learning algorithm) as a case study. We report performance and total energy usage for our system implementations and discuss the system architecture design trade offs.

  20. PSM implementation at a refinery

    SciTech Connect (OSTI)

    Nahale, T.

    1995-12-31

    Prior to the promulgation of the OSHA Standard on Process Safety Management (PSM), the petroleum industry had a precursor developed by the American Petroleum Institute titled Recommended Practice 750, Management of Process Hazards. This Recommended Practice, though not identical with the OSHA regulation, provided the industry with a voluntary standard prior to May, 1992, when PSM went into effect. In formulating a PSM implementation strategy, one of the first decisions encountered at a facility is whether to utilize a separate group dedicated full-time to PSM issues, or to develop the program using key individuals who continue to perform their regulator job duties. Although a PSM manager may prefer one strategy over the other, this staffing decisions is normally made by senior management at the facility.

  1. AIMFAST: Alignment Implementation for Manufacturing

    Energy Science and Technology Software Center (OSTI)

    2012-09-13

    AIMFAST is a software code used to align facets on a dish concentrator to a specific aimpoint strategy to minimize peak fluxes and maximize system optical performance. AIMFAST uses a large monitor or projections screen to display fringe patterns, and a machine vision camera to image the reflection of these patterns in the subject dish mirrors. From these images, a detailed map of surface normals can be generated and compared to design or fitted mirrormore » shapes. This fitted comparison is then used to develop a single vector representing the orientation of the facets relative to the design orientation, and provide near-real-time adjustment information to a communicating computer. The communicating computer can display adjustments or directly interface with adjustment tools. The software for the communicating computer is specific to the implementation and is not a part of AIMFAST.« less

  2. CRAD, Chemical Management Implementation- June 30, 2011

    Broader source: Energy.gov [DOE]

    Chemical Management Implementation Inspection Criteria, Approach, and Lines of Inquiry (HSS CRAD 45-31, Rev. 1)

  3. Departmental Personnel Security- Policy and Procedures

    Office of Energy Efficiency and Renewable Energy (EERE)

    Departmental Personnel Security provides centralized and authoritative policy guidance and ensures consistent and effective implementation of the DOE personnel security program Department-wide to include the National Nuclear Security Administration.

  4. Congressional Final House Final Senate Current Request Mark

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 FY 2010 FY 2010 FY 2010 ($ in thousands) Congressional Final House Final Senate Current Request Mark Mark Appropriation FOSSIL ENERGY R&D Coal 368,865 394,315 428,200 393,485 Natural Gas Technologies 25,000 25,000 25,000 17,364 Unconventional Fossil Energy Technologies 0 0 25,000 19,474 Program Direction 158,000 158,000 158,000 158,000 Plant & Capital Equipment 20,000 20,000 20,000 20,000 Environmental Restoration 10,000 10,000 10,000 10,000 Cooperative Res. & Development 0 0 5,000

  5. Expedited technology demonstration project final report: final forms

    SciTech Connect (OSTI)

    Hopper, R W

    1999-05-01

    ETDP Final Forms was an attempt to demonstrate the fabrication and performance of a ceramic waste form immobilizing the hazardous and radioactive elements of the MSO/SR mineral residues. The ceramic material had been developed previously. The fabrication system was constructed and functioned as designed except for the granulator. Fabrication of our particular ceramic, however, proved unsatisfactory. The ceramic material design was therefore changed toward the end of the project, replacing nepheline with zircon as the sink for silica. Preliminary results were encouraging, but more development is needed. Fabrication of the new ceramic requires major changes in the processing: Calcination and granulation would be replaced by spray drying; and sintering would be at higher temperature. The main goal of the project--demonstrating the fabrication and performance of the waste form--was not achieved. This report summarizes Final Forms' activities. The problem of immobilizing the MSO/SR mineral residues is discussed.

  6. Energy Sector Cybersecurity Framework Implementation Guidance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    JANUARY 2015 ENERGY SECTOR CYBERSECURITY FRAMEWORK IMPLEMENTATION GUIDANCE U.S. DEPARTMENT OF ENERGY OFFICE OF ELECTRICITY DELIVERY AND ENERGY RELIABILITY Energy Sector Cybersecurity Framework Implementation Guidance │ Table of Contents TABLE OF CONTENTS 1. Introduction .............................................................................................................................................. 1 2. Preparing for Framework Implementation

  7. Energy Systems Acquisitions Advisory Board Procedures

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-10-28

    The Notice streamlines the Energy Systems Acquisition Advisory Board (ESAAB) process to ensure informed, objective, and documented Strategic and Major System Critical Decision, Baseline Change Proposal, and site selection final decisions. Does not cancel other directives.

  8. Technical Support Document for the Department of Energy's Notice of Final

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rulemaking | Department of Energy Technical Support Document for the Department of Energy's Notice of Final Rulemaking Technical Support Document for the Department of Energy's Notice of Final Rulemaking In this Technical Support Document, DOE presents each of the changes to its NEPA implementing regulations (10 CFR part 1021, Subparts B, C, and D) and provides supplementary support for the changes. The left column of the table below shows the changes to the existing regulations and the

  9. Final closure cover for a Hanford radioactive mixed waste disposal facility

    SciTech Connect (OSTI)

    Johnson, K.D.

    1996-02-06

    This study provides a preliminary design for a RCRA mixed waste landfill final closure cover. The cover design was developed by a senior class design team from Seattle University. The design incorporates a layered design of indigenous soils and geosynthetics in a layered system to meet final closure cover requirements for a landfill as imposed by the Washington Administrative Code WAC-173-303 implementation of the Resource Conservation and Recovery Act.

  10. Simulations of neutralized final focus

    SciTech Connect (OSTI)

    Welch, D.R.; Rose, D.V.; Genoni, T.C.; Yu, S.S.; Barnard, J.J.

    2005-01-18

    In order to drive an inertial fusion target or study high energy density physics with heavy ion beams, the beam radius must be focused to < 3 mm and the pulse length must be compressed to < 10 ns. The conventional scheme for temporal pulse compression makes use of an increasing ion velocity to compress the beam as it drifts and beam space charge to stagnate the compression before final focus. Beam compression in a neutralizing plasma does not require stagnation of the compression, enabling a more robust method. The final pulse shape at the target can be programmed by an applied velocity tilt. In this paper, neutralized drift compression is investigated. The sensitivity of the compression and focusing to beam momentum spread, plasma, and magnetic field conditions is studied with realistic driver examples. Using the 3D particle-in-cell code, we examine issues associated with self-field generation, stability, and vacuum-neutralized transport transition and focusing.

  11. Procedures for ground-water investigations

    SciTech Connect (OSTI)

    Not Available

    1989-09-01

    This manual was developed by the Pacific Northwest Laboratory (PNL) to document the procedures used to carry out and control the technical aspects of ground-water investigations at the PNL. Ground-water investigations are carried out to fulfill the requirements for the US Department of Energy (DOE) to meet the requirements of DOE Orders. Investigations are also performed for various clients to meet the requirements of the Resource Conservation and Recovery Act of 1976 (RCRA) and the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). National standards including procedures published by the American Society for Testing and Materials (ASTM) and the US Geological Survey were utilized in developing the procedures contained in this manual.

  12. Final DOE Areas Feasibility Study

    Office of Legacy Management (LM)

    Management, Washington, DC Weiss Associates Environmental Science, Engineering and Management FINAL DOE AREAS FEASIBILITY STUDY for the: LABORATORY FOR ENERGY-RELATED HEALTH RESEARCH UNIVERSITY OF CALIFORNIA, DAVIS Prepared for: SM Stoller Corporation 2597 B ¾ Road Grand Junction, Colorado 81503 Prepared by: Weiss Associates 5801 Christie Avenue, Suite 600 Emeryville, California 94608-1827 March 07, 2008 Rev. 0 J:\DOE_STOLLER\4110\143\FEASIBILITY_STUDY\20080307_FS_TEXT_REV0.DOC WEISS ASSOCIATES

  13. Procedures for measuring the properties of heat-pipe wick materials

    SciTech Connect (OSTI)

    Adkins, D.R.; Dykhuizen, R.C.

    1993-07-01

    Accurate measurements of wick properties must be available to design high-performance beat pipes and to properly interpret results from heat pipe tests. In a program that is aimed at developing heat-pipe receivers for solar-Stirling electric systems, we have recently explored procedures to measure the effective pore radius and permeability of wick materials in their final ``as fabricated`` condition. Measurement techniques are compared in this paper and problems that are frequently encountered in measuring wick properties are discussed.

  14. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix J: Recreation.

    SciTech Connect (OSTI)

    Columbia River System Operation Review

    1995-11-01

    This Appendix J of the Final Environmental Impact Statement for the Columbia River System discusses impacts on the recreational activities in the region. Major sections include the following: scope and processes; recreation in the Columbia River Basin today - by type, location, participation, user characteristics, factors which affect usage, and managing agencies; recreation analysis procedures and methodology; and alternatives and their impacts.

  15. Coordinate Measuring Machine Pit Artifact Inspection Procedure

    SciTech Connect (OSTI)

    Montano, Joshua D.

    2012-07-31

    The goal of this document is to outline a procedure for dimensional measurement of Los Alamos National Laboratory's CMM Pit Artifact. This procedure will be used by the Manufacturing Practice's Inspection Technology Subgroup of the Interagency Manufacturing Operations Group and Joint Operations Weapon Operations Group (IMOG/JOWOG 39) round robin participants. The intent is to assess the state of industry within the Nuclear Weapons Complex for measurements made on this type of part and find which current measurement strategies and techniques produce the best results.

  16. Hanford Site Lockout/Tagout Procedure

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Revision 2B Hanford Site Lockout/Tagout Procedure Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management Approved for Public Release; Further Dissemination Unlimited DOE-0336, Rev. 2B Hanford Site Lockout/Tagout Procedure Published Date: 08-29-2016 Effective Date: 10-03-2016 ii CHANGE SUMMARY Rev# Section Changed Change Details 2 Section 1.0, Section 2.0 Removes the ability for users to use DOE-0336 for equipment configuration. 2 Section 5.1, Section 5.4.1,

  17. Hanford Site Lockout/Tagout Procedure

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Revision 2A Hanford Site Lockout/Tagout Procedure Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management Approved for Public Release; Further Dissemination Unlimited DOE-0336, Rev. 2A Hanford Site Lockout/Tagout Procedure Published Date: 01-04-2016 Effective Date: 04-18-2016 ii CHANGE SUMMARY Rev# Section Changed Change Details 2 Section 1.0, Section 2.0 Removes the ability for users to use DOE-0336 for equipment configuration. 2 Section 5.1, Section 5.4.1,

  18. DOT-7A packaging test procedure

    SciTech Connect (OSTI)

    Kelly, D.L.

    1995-01-23

    This test procedure documents the steps involved with performance testing of Department of Transportation Specification 7A (DOT-7A) Type A packages. It includes description of the performance tests, the personnel involved, appropriate safety considerations, and the procedures to be followed while performing the tests. Westinghouse Hanford Company (WHC) is conducting the evaluation and testing discussed herein for the Department of Energy-Headquarters, Division of Quality Verification and Transportation Safety (EH-321). Please note that this report is not in WHC format. This report is being submitted through the Engineering Documentation System so that it may be used for reference and information purposes.

  19. Year 2000 TWRS Maintenance procedure review report

    SciTech Connect (OSTI)

    ADAMS, M.R.

    1999-02-24

    A concern exists that some equipment in use might contain microprocessors that are dependent upon a time date function. The majority of the software programming for microprocessors has only utilized a 2 digit identifier for the year. With the approach of the year 2000, (Y2K), there is concern that the date function will not be correctly recognized and some functions will not operate properly. TWRS maintenance procedures have been reviewed to identify equipment components that may not be Y2K compliant. Engineering judgment was utilized to eliminate procedures and equipment that is obviously not impacted by Y2K.

  20. Summative Mass Analysis of Algal Biomass - Integration of Analytical Procedures: Laboratory Analytical Procedure (LAP)

    SciTech Connect (OSTI)

    Laurens, L. M. L.

    2013-12-01

    This procedure guides the integration of laboratory analytical procedures to measure algal biomass constituents in an unambiguous manner and ultimately achieve mass balance closure for algal biomass samples. Many of these methods build on years of research in algal biomass analysis.