National Library of Energy BETA

Sample records for implementing doe order

  1. Framework for Implementing DOE Order 144.1 | Department of Energy

    Energy Savers [EERE]

    Framework for Implementing DOE Order 144.1 Framework for Implementing DOE Order 144.1 Ensures consistent interpretation and application of the DOE Indian Policy and its principles when dealing with affected tribes. The Framework is directed at all EM, NE, SC, and NNSA facilities, programs, and sites, and at DOE sites where there are EM, NE, SC, or NNSA funded activities. PDF icon Framework for Implementing DOE Order 144.1 More Documents & Publications DOE Order 144.1 - Department of Energy

  2. Status Update for Implementation of Best Available Technology per DOE Order 5400.5

    SciTech Connect (OSTI)

    C. A. Major

    1999-07-01

    This report provides an update, as of July 1999, on the implementation of best available technology to control or eliminate radionuclide discharges to soil columns at facilities at the Idaho National Engineering and Environmental Laboratory in accordance with DOE Order 5400.5, ''Radiation Protection of the Public and Environment.'' The best available technology to reduce or eliminate radionuclide discharges to soil columns currently implemented by the different facilities appears to be generally effective. Therefore, the different facilities should continue their current best available technology approaches, and also implement the specific recommendations listed in this report for their respective facility.

  3. Accelerator Facility Safety Implementation Guide for DOE Order 420.2C, Safety of Accelerator Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-08-30

    This is a guide to understanding and meeting the requirements of DOE Order 420.2C and shares lessons learned based on valuable experience within the community.

  4. 2005 Update for Implementing Best Available Technology per DOE Order 5400.5

    SciTech Connect (OSTI)

    INL

    2006-09-01

    The report addresses Best Available Technology per DOE Order 5400.5 in relation to wastewater discharges to the soil. In accordance with Contract Data Requirements List F.19, this report addresses the Best Available Technology requirements per Department of Energy (DOE) Order 5400.5, "Radiation Protection of the Public and the Environment", as they apply to radiological discharges to the soil for Calendar Year 2005. The report includes review of discharges for both, Battelle Energy Alliance, LLC and CH2M WG Idaho, LLC. The Best Available Technology selection process is applicable to wastewater discharges containing process derived radionuclides to surface waters, sanitary sewerages greater than five times the Derived Concentration Guideline (found in DOE Order 5400.5), and to the soil. Wastewater at the Idaho National Laboratory Site is not discharged to surface water (Big Lost River and Birch Creek) nor is it discharged to sanitary sewerages at activity levels greater than five times a Derived Concentration Guideline. Therefore, this report focuses on radiological discharges to the soil.

  5. Status Update for Implementing Best Available Technology per DOE Order 5400.5

    SciTech Connect (OSTI)

    Lewis, Michael George

    2001-09-01

    This report documents the Bechtel BWXT Idaho, LCC, operated facilities at the Idaho National Engineering and Environmental Laboratory that require the Best Available Technology selection process in accordance with Department of Energy Order 5400.5, Chapter II (3), “Management and Control of Radioactive Materials in Liquid Discharges.”1 This report differs from previous reports in that only those liquid waste streams and facilities requiring the Best Available Technology selection process will be evaluated in detail. In addition, this report will be submitted to the DOE-ID Field Office Manager for approval in accordance with DOE Order 5400.5, Chapter II, Section 3.b.(1). The report also identifies facilities addressed in last year’s report that do not require the Best Available Technology selection process to be completed. These facilities will not be addressed in future reports. This report reviews the following facilities: • Auxiliary Reactor Area • Idaho National Engineering and Environmental Laboratory Block Areas • Central Facilities Area • Idaho Nuclear Technology and Engineering Center • Idaho Falls Facilities • Power Burst Facility • Radioactive Waste Management Complex • Test Area North • Test Reactor Area. Three facilities (Central Facilities Area Sewage Treatment Plant, Idaho Nuclear Technology and Engineering Center Percolation Ponds and Test Area North/Technical Support Facility Disposal Pond) at the Idaho National Engineering and Environmental Laboratory required documentation of the Best Available Technology selection process. The Idaho Nuclear Technology and Engineering Center Percolation Ponds and Test Area North/Technical Support Facility Disposal Pond discharge wastewater that may contain process-derived radionuclides to a soil column with average radionuclide concentrations below drinking water MCLs. At the request of the Department of Energy Idaho Operations Office, Bechtel BWXT Idaho, LLC has included the 73.5acre Central Facilities Area Sewage Treatment Plant land application site in Section 4 (Facilities Requiring BAT) of this report to ensure the requirements of DOE Order 5400.5, Chapter II, Section 3 are met. The Central Facilities Area Sewage Treatment Plant effluent may contain process-derived radionuclides. However, the average concentrations of these radionuclides are below MCLs.According to DOE guidance, “If the liquid waste stream is below MCLs, this indicates that the goals of the Best Available Technology selection process are being met and the liquid waste stream is considered clean water. However, it is necessary to document this through the Best Available Technology selection process”.

  6. Accelerator Facility Safety Implementation Guide for DOE Order (0) 420.2C, Safety of Accelerator Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-07-17

    The revision will address implementation of roles and responsibilities, improve operational efficiency using operating experience, and clarify the use of program requirements such as the Unreviewed Safety Issue and Accelerator Readiness Review.

  7. DOE Order on Quality Assurance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AVAILABLE ONLINE AT: INITIATED BY: www.directives.doe.gov Office of Health, Safety and Security U.S. Department of Energy ORDER Washington, D.C. Approved: 4-25-2011 SUBJECT: QUALITY ASSURANCE 1. PURPOSE. a. To ensure that Department of Energy (DOE), including National Nuclear Security Administration (NNSA), products and services meet or exceed customers' requirements and expectations. b. To achieve quality for all work based upon the following principles: (1) All work, as defined in this Order,

  8. Implementation of Executive Order 12114 Environmental Effects...

    Energy Savers [EERE]

    Implementation of Executive Order 12114 Environmental Effects Abroad of Major Federal Actions: Final Guideline Implementation of Executive Order 12114 Environmental Effects Abroad...

  9. Order Module--DOE Order 422.1, CONDUCT OF OPERATIONS | Department of Energy

    Energy Savers [EERE]

    Order 422.1, CONDUCT OF OPERATIONS Order Module--DOE Order 422.1, CONDUCT OF OPERATIONS The general approach to implementing DOE O 422.1 is for contractors to develop, for DOE line management approval, documentation demonstrating implementation of the requirements in the contractor requirements document (CRD). DOE line management means the Federal officials such as Secretarial Officers and heads of field elements responsible for DOE facilities and operations. It is necessary to provide a conduct

  10. Implementing Executive Order 13423 | Department of Energy

    Office of Environmental Management (EM)

    Implementing Executive Order 13423 Implementing Executive Order 13423 Guide describes the instructions on the requirements and how fleets should implement the Executive Order 13423. PDF icon instructions_eo13423.pdf More Documents & Publications Executive Order 13423 Implementing Instructions Guidance for Federal Agencies on E.O. 13514 Section 12, Federal Fleet Management OVERVIEW OF EXECUTIVE ORDER 13XXX Federal Leadership in Environmental, Energy and Economic Performance

  11. DOE Order 420.1C Briefing | Department of Energy

    Office of Environmental Management (EM)

    20.1C Briefing DOE Order 420.1C Briefing August 2013 PowerPoint Briefing of Changes to DOE O 420.1C and Expectations for Effective Implementation The revised Order clarifies, streamlines and updates DOE and contractors' reqquirements and responsibilities The revised Order updates the requirements to reflect current industry practices EHSS is open to feedback from implementing organizations EHSS is available to provide assistance in understanding the Order requirements and how to effectively

  12. DOE Order 451.1B: NEPA Compliance Program (DOE, 2012)

    Broader source: Energy.gov [DOE]

    The purpose of this Order is to establish DOE internal requirements and responsibilities for implementing the National Environmental Policy Act of 1969 (NEPA), the Council on Environmental Quality...

  13. LFRG DOE Order 435.1 | Department of Energy

    Energy Savers [EERE]

    LFRG DOE Order 435.1 LFRG DOE Order 435.1 Chapter 4 of the DOE Manual on Order 435.1, Low-level Waste Requirements, addresses the procedures whereby Department of Energy LLW Disposal Facilities will operated and maintained. Section P and Section Q describe the Performance Assessment and Composite Analysis documents that each DOE disposal facility will submit to the LFRG. To view the entire DOE Order, Manual, and Implementation Guidance documents, choose the link below to get to the main DOE

  14. Frequently Asked Questions Regarding DOE Order 420.1C, Facility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Order 420.1C, Facility Safety More Documents & Publications DOE Order 420.1C Briefing DOE O 420.1B1C Crosswalk Matrix Order Implementation Challenges in Idaho Falls Facilities

  15. DOE - Fossil Energy: Orders-2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LLC Order Granting Blanket Authority to Export LNG to Dominican Republic, El Salvador, Guatemala, Honduras, and Nicaragua in ISO Containers by Vessel. 3370 13-142-NG 12...

  16. Policy Perspective: Meeting the Challenge of the DOE Order 436.1 Departmental Sustainability - 12527

    SciTech Connect (OSTI)

    MacDonald, Jennifer C.

    2012-07-01

    DOE's Sustainability Performance Office is working to meet sustainability goals at DOE by implementing Executive Orders, Departmental policy, the DOE Strategic Sustainability Performance Plan (SSPP) and legislation related to sustainability. Through implementation of Executive Orders, Departmental policy, the SSPP, statutory requirements and regular reporting, analysis and communication, DOE's SPO is working to maintain and expand DOE's leadership in sustainability. (authors)

  17. Notice regarding DOE NEPA implementation

    Broader source: Energy.gov [DOE]

    Announces the Secretary's 10-point initiative to ensure that all DOE activities are carried out in full compliance with the letter and spirit of environmental statutes and regulations.

  18. DOE Order 451.1B: NEPA Compliance Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Order 451.1B: NEPA Compliance Program DOE Order 451.1B: NEPA Compliance Program The purpose of this Order is to establish DOE internal requirements and responsibilities for implementing the National Environmental Policy Act of 1969 (NEPA), the Council on Environmental Quality Regulations Implementing the Procedural Provisions of NEPA (40 CFR Parts 1500-1508), and the DOE NEPA Implementing Procedures (10 CFR Part 1021). PDF icon DOEO4511B_011912.pdf More Documents & Publications Order

  19. Understanding and Implementing DOE Quality Requirements and ASME...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Implementing DOE Quality Requirements and ASME NQA-1 in DOE Nuclear Projects, A Management Overview and Introduction, May 14, 2015 Understanding and Implementing DOE Quality...

  20. Yellow: Pre-DOE Implementation Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pre-DOE Implementation Plan 192012 Page 1 of 3 Waste Treatment Plant (WTP) Safety Culture Background: A chain of events involving the design and construction of the Hanford...

  1. Order Module--DOE STD-1098-2008, DOE STANDARD: RADIOLOGICAL CONTROL |

    Energy Savers [EERE]

    Department of Energy STD-1098-2008, DOE STANDARD: RADIOLOGICAL CONTROL Order Module--DOE STD-1098-2008, DOE STANDARD: RADIOLOGICAL CONTROL "The radiological control program discussed in DOE-STD-1098-2008 goes beyond the scope of, and includes more details than, the documented radiation protection program (RPP) required by 10 CFR 835, -Occupational Radiation Protection.‖ To ensure implementation of a comprehensive and coherent radiological control program that exceeds basic

  2. Executive Order 13423 Implementing Instructions | Department of Energy

    Office of Environmental Management (EM)

    423 Implementing Instructions Executive Order 13423 Implementing Instructions INSTRUCTIONS FOR IMPLEMENTING EXECUTIVE ORDER 13423 "Strengthening Federal Environmental, Energy, and Transportation Management" PDF icon Executive Order 13423 Implementing Instructions More Documents & Publications Implementing Executive Order 13423 Guidance for Federal Agencies on E.O. 13514 Section 12, Federal Fleet Management OVERVIEW OF EXECUTIVE ORDER 13XXX Federal Leadership in Environmental,

  3. Implementation of Department of Energy Order 580.1, Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Personal Property Management More Documents & Publications Policy Flash 2014-40 Implementation of DOE O 580.1A, DOE Energy Personal Property Management ...

  4. DOE Awards Small Business Task Order

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today announced the award of a Time and Materials Task Order to Industrial Economics, Incorporated, located in Cambridge, MA. Industrial Economics, Incorporated is a Small Business. The Task Order will have a maximum value of $1.77 million over 3 years.

  5. Implementation Guidance for the DOE Policy on Documentation and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Implementation Guidance for the DOE Policy on Documentation and Online Posting of Categorical Exclusion Determinations Implementation Guidance for the DOE Policy on Documentation ...

  6. Implementation of DOE NPH Requirements at the Thomas Jefferson National

    Office of Environmental Management (EM)

    Accelerator Facility (TJNAF), a Non-Nuclear DOE Lab | Department of Energy Implementation of DOE NPH Requirements at the Thomas Jefferson National Accelerator Facility (TJNAF), a Non-Nuclear DOE Lab Implementation of DOE NPH Requirements at the Thomas Jefferson National Accelerator Facility (TJNAF), a Non-Nuclear DOE Lab Implementation of DOE NPH Requirements at the Thomas Jefferson National Accelerator Facility (TJNAF), a Non-Nuclear DOE Lab David Luke, DOE, Thomas Jefferson Site Office

  7. Order Module--DOE O 435.1 RADIOACTIVE WASTE MANAGEMENT | Department of

    Energy Savers [EERE]

    Energy 5.1 RADIOACTIVE WASTE MANAGEMENT Order Module--DOE O 435.1 RADIOACTIVE WASTE MANAGEMENT DOE Order 5820.2A, Radioactive Waste Management, was issued by DOE in September 1988. As early as 1990, DOE began analyzing, assessing, and reviewing the process of implementing the Order. DOE revised the Order on radioactive waste management for several reasons: - After thorough technical reviews and analyses, DOE and the Defense Nuclear Facilities Safety Board concluded that DOE Order 5820.2A did

  8. Guidelines for Implementing Executive Order 11988, "Floodplain...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    implementing guidelines explain the use of natural systems, ecosystem processes, and nature-based approaches for identifying alternatives, and provide other technical guidance ...

  9. DOE Celebrates 20-Year Anniversary of Executive Order 12898 on...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Celebrates 20-Year Anniversary of Executive Order 12898 on Environmental Justice DOE Celebrates 20-Year Anniversary of Executive Order 12898 on Environmental Justice April 8, ...

  10. Implementation of DOE NPH Requirements at the Thomas Jefferson...

    Office of Environmental Management (EM)

    Facility (TJNAF), a Non-Nuclear DOE Lab David Luke, DOE, Thomas Jefferson Site Office Stephen McDuffie, DOE, Office of the Chief of Nuclear Safety PDF icon Implementation of DOE...

  11. DOE Order 482.1 | Department of Energy

    Office of Environmental Management (EM)

    Order 482.1 DOE Order 482.1 DOE FACILITIES TECHNOLOGY PARTNERING PROGRAMS PDF icon DOE Order 482.1 More Documents & Publications DOE Cooperative Research and Development Agreements DOE M 483.1-1 Policy_Statement_on_Technology_Transfer.pdf

  12. DOE Order on Quality Assurance | Department of Energy

    Energy Savers [EERE]

    Quality Assurance » DOE Order on Quality Assurance DOE Order on Quality Assurance The purpose of this order is to ensure that Department of Energy (DOE), including National Nuclear Security Administration (NNSA), products and services meet or exceed customers' requirements and expectations. PDF icon DOE Order on Quality Assurance More Documents & Publications Order Module--DOE O 414.1D, QUALITY ASSURANCE Order Module--SAFETY SOFTWARE GUIDE FOR USE WITH 10 CFR 830, SUBPART A, QUALITY

  13. EAC Recommendations for DOE Action Regarding Implementing Effective...

    Broader source: Energy.gov (indexed) [DOE]

    Implementing Effective Enterprise Security Governance, approved at the March 12-13, 2014 meeting. EAC Recommendations for DOE Action Regarding Implementing Effective Enterprise...

  14. EAC Recommendations for DOE Action Regarding Implementing Effective...

    Broader source: Energy.gov (indexed) [DOE]

    Implementing Effective Enterprise Security Governance, approved at the March 12-13, 2014 meeting. EAC Recommendations for DOE Action Regarding Implementing Effective...

  15. Technical Standards, DOE Orders and Applicable CFRs/DEAR Crosswalk -

    Energy Savers [EERE]

    February 2, 2002 | Department of Energy DOE Orders and Applicable CFRs/DEAR Crosswalk - February 2, 2002 Technical Standards, DOE Orders and Applicable CFRs/DEAR Crosswalk - February 2, 2002 February 2, 2002 DOE Orders/Standards and Applicable CFRs/DEAR Crosswalk List PDF icon Technical Standards, DOE Orders and Applicable CFRs/DEAR Crosswalk More Documents & Publications Technical Standards,DOE Standards and Corresponding Directives Crosswalk - February 2, 2002 Technical Standards,

  16. DOE National Environmental Policy Act Implementing Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... applied by any organizational element of DOE. ... is small, in addition to the actual magnitude of the proposal, DOE considers factors ... A1 Routine DOE Business Actions Routine ...

  17. Order Module--DOE O 440.1B, WORKER PROTECTION PROGRAM FOR DOE...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WORKER PROTECTION PROGRAM FOR DOE (INCLUDING NNSA) FEDERAL EMPLOYEES Order Module--DOE O 440.1B, WORKER PROTECTION PROGRAM FOR DOE (INCLUDING NNSA) FEDERAL EMPLOYEES The...

  18. New Guidelines for Implementing Executive Order 11988, "Floodplain

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management," And Executive Order 13690, "Establishing a Federal Flood Risk Management Standard..." | Department of Energy New Guidelines for Implementing Executive Order 11988, "Floodplain Management," And Executive Order 13690, "Establishing a Federal Flood Risk Management Standard..." New Guidelines for Implementing Executive Order 11988, "Floodplain Management," And Executive Order 13690, "Establishing a Federal Flood Risk Management

  19. Implementation of Executive Order 12114 Environmental Effects Abroad of

    Office of Environmental Management (EM)

    Major Federal Actions: Final Guideline | Department of Energy Implementation of Executive Order 12114 Environmental Effects Abroad of Major Federal Actions: Final Guideline Implementation of Executive Order 12114 Environmental Effects Abroad of Major Federal Actions: Final Guideline The Department of Energy hereby adopts final Departmental guidelines implementing Executive Order 12114-Environmental Effecrs Abroad of Major Federal Actions, whic was issued on January 4, 1979. PDF icon

  20. Implementation of Executive Order 13514, Federal Leadership in...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in Environmental, Energy, and Economic Performance Implementation of Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance PDF icon ...

  1. Draft Revised Guidelines for Implementing Executive Order 11988, "Floodplain Management"

    Broader source: Energy.gov [DOE]

    The Federal Emergency Management Agency published the draft “Revised Guidelines for Implementing Executive Order 11988, Floodplain Management” for public review and comment on January 30, 2015.

  2. DOE NEPA Implementing Procedures: Final Rule (57 Fed Reg 15122) |

    Office of Environmental Management (EM)

    Department of Energy 57 Fed Reg 15122) DOE NEPA Implementing Procedures: Final Rule (57 Fed Reg 15122) DOE revised the existing rule at 10 CFR part 1021, titled "Compliance with the National Environmental Policy Act," to incorporate revised provision of DOE's Guidelines for Implementing the Procedural Provisions of the National Environmental Policy Act (NEPA). PDF icon 10CFR1021_04_24_1992.pdf More Documents & Publications 57 Fed Reg 15122: DOE NEPA Implementing

  3. DOE NEPA Implementing Procedures: Final Rule (61 Fed Reg 64603) |

    Office of Environmental Management (EM)

    Department of Energy 64603) DOE NEPA Implementing Procedures: Final Rule (61 Fed Reg 64603) DOE amended its regulations governing compliance with the National Environmental Policy Act (NEPA). These amendments incorporate changes primarily related to DOE's power marketing activities, based on DOE's experience in applying the current NEPA regulations. The revised regulations are intended to improve DOE's efficiency in implementing NEPA requirements by reducing costs and preparation time, while

  4. DOE: Support Implementation of EEOICPA | Department of Energy

    Office of Environmental Management (EM)

    Support Implementation of EEOICPA DOE: Support Implementation of EEOICPA Addthis Description DOE's primary role in the EEOICPA is to provide records to DOL, NIOSH and DOJ, to support claim processing, dose reconstruction and ultimately claim adjudication. The worker records provided by DOE play a vital role in the EEOICPA claims process

  5. Order DOE O 205.1B | Department of Energy

    Office of Environmental Management (EM)

    Order DOE O 205.1B Order DOE O 205.1B To set forth requirements and responsibilities for a Departmental Cyber Security Program (CSP) that protects information and information systems for the Department of Energy (DOE) PDF icon DOE O 205.1B Chg 2.pdf More Documents & Publications DOE O 205.1B Reference List Part I, DAA Overview ; AODR Role-Based Training Information Management Governance Council

  6. DOE Orders/Standards and Applicable CFRs/DEAR Crosswalk

    Office of Environmental Management (EM)

    2/11/02 1 DOE Orders/Standards and Applicable CFRs/DEAR Crosswalk DOE Order Title Date Corresponding Standards Corresponding CFRs/DEAR Clauses DOE O 3790.1B Federal Employee Occupational Safety and Health Program 1/93 ½ DOE-STD-1138-2000 ½ DOE-STD-1120-98 ½ DOE O 4700.1 Project Management System 3/87 Chg 1 6/92 ½ DOE-STD-1073-93 ½ DOE-STD-1128-98 ½ DOE-STD-6003-96 ½ DOE-HDBK-3027-99 ½ 10 CFR 835 DOE O 5400.1 General Environmental Protection Program 11/88 Chg 1 6/90 ½ DOE-STD-1120-98 ½

  7. Implementation Guidance for the DOE Policy on Documentation and Online

    Energy Savers [EERE]

    Posting of Categorical Exclusion Determinations | Department of Energy Implementation Guidance for the DOE Policy on Documentation and Online Posting of Categorical Exclusion Determinations Implementation Guidance for the DOE Policy on Documentation and Online Posting of Categorical Exclusion Determinations To further transparency and openness in its implementation of the National Environmental Policy Act (NEPA), the Department of Energy (DOE) has established a policy requiring each Program

  8. cd ordering | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CD-DVD Ordering System Please complete the following information so the National Energy Technology Lab (NETL) can promptly process your order. Below is a sample of the fields...

  9. Reply comments to DOE Request for Information-Implementing the...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Access, Third Party Use, and Privacy Reply comments to DOE Request for Information-Implementing the National Broadband Plan by Empowering Customers and the Smart Grid: Data Access...

  10. DOE Request for Information - Implementing the National Broadband...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Data Access, Third Party Use, and Privacy DOE Request for Information - Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third ...

  11. DOE NEPA Implementing Procedures: Final Rule (61 Fed Reg 36222) |

    Office of Environmental Management (EM)

    Department of Energy 36222) DOE NEPA Implementing Procedures: Final Rule (61 Fed Reg 36222) DOE amended its existing regulations governing compliance with the National Environmental Policy Act (NEPA). The amendments incorporate changes that improve DOE's efficiency in implementing NEPA requirements by reducing costs and preparation time while maintaining quality, consistent with the DOE Secretarial Policy Statement on NEPA issued in June 1994. These amendments also incorporate changes

  12. Policy Flash 2014-40 Implementation of DOE O 580.1A, DOE Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Policy Flash 2014-40 Implementation of DOE O 580.1A, DOE Energy Personal Property Management Questions may be referred to Scott Whiteford (202) 287-1563 or scott.whiteford@hq.doe.g...

  13. Revision to DOE Order 435.1 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management has primary responsibility, within DOE, for DOE Order 435.1, the self-regulation of radioactive waste management. As part of this responsibility, EM has decided to ...

  14. DOE Order 435.1, Radioactive Waste Management

    Broader source: Energy.gov [DOE]

    The objective of this U.S. Department of Energy (DOE) Order is to ensure that all DOE radioactive waste is managed in a manner that is protective of worker and public health and safety and the environment.

  15. DOE Celebrates 20-Year Anniversary of Executive Order 12898 on

    Office of Environmental Management (EM)

    Environmental Justice | Department of Energy DOE Celebrates 20-Year Anniversary of Executive Order 12898 on Environmental Justice DOE Celebrates 20-Year Anniversary of Executive Order 12898 on Environmental Justice April 8, 2014 - 6:05pm Addthis What does this project do? Goal 1. Protect human health and the environment KSA2316_ Sec Moniz with members of DOE EJ Task Force.jpg DOE Secretary Moniz (fifth from left) and members of the DOE EJ Task Force celebrate E0 12898 20-year anniversary.

  16. DOE - Fossil Energy: Orders Issued in 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to Import LNG from Various International Sources by Vessel 3082 FE12-24-LNG 040512 Prometheus Energy Group Order Granting Blanket Authority to ImportExport LNG fromto Canada by...

  17. Briefing, DOE Order 475.2B, Identifying Classified Information...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    What Derivative Classifiers Should Know Briefing, DOE Order 475.2B, Identifying Classified Information, What Derivative Classifiers Should Know October 14, 2014 This briefing ...

  18. DOE Sustainability Support Information Brief on Executive Order...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Justice in Minority and Low-Income Populations DOE Sustainability Support Information Brief on Executive Order 12898, Federal Actions to Address Environmental Justice in ...

  19. DOE Awards Research and Systems Engineering Task Order

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today awarded a task order to The MITRE Corporation, of McLean Virginia.

  20. Order Module--DOE O 433.1B, MAINTENANCE MANAGEMENT PROGRAM FOR DOE NUCLEAR FACILITIES

    Broader source: Energy.gov [DOE]

    "The familiar level of this module is designed to summarize the basic information in DOE O 433.1B, Maintenance Management Program for DOE Nuclear Facilities. This Order canceled DOE O 433.1A. This...

  1. DOE Order 440. 1 B: Worker Protection Program for DOE (Including...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    440. 1 B: Worker Protection Program for DOE (Including NNSA) Federal Employees Stakeholders: DOE and NNSA employees Scope: DOE Order 440.1 B establishes the framework for an...

  2. Policy Flash 2014-40 Implementation of DOE O 580.1A, DOE Energy Personal

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Property Management | Department of Energy 40 Implementation of DOE O 580.1A, DOE Energy Personal Property Management Policy Flash 2014-40 Implementation of DOE O 580.1A, DOE Energy Personal Property Management Questions may be referred to Scott Whiteford (202) 287-1563 or scott.whiteford@hq.doe.gov PDF icon POLICY_FLASH_Final.pdf More Documents & Publications Policy Flashes 2014 Personal Property Briefings Inspection Report: INS-O-02-01

  3. Implementation of Executive Order 13514, Federal Leadership in

    Energy Savers [EERE]

    Environmental, Energy, and Economic Performance | Department of Energy Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance Implementation of Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance PDF icon 2010.03.31 Secretary Memo - Scope 1 GHG reduction goal.pdf More Documents & Publications OVERVIEW OF EXECUTIVE ORDER 13XXX Federal Leadership in Environmental, Energy and Economic Performance Guidance for

  4. Revised Guidelines for Implementing Executive Order 11988, "Floodplain

    Energy Savers [EERE]

    Management," and Executive Order 13690, "Establishing a Federal Flood Risk Management Standard and a Process for Further Soliciting and Considering Stakeholder Input" (2015) | Department of Energy Guidelines for Implementing Executive Order 11988, "Floodplain Management," and Executive Order 13690, "Establishing a Federal Flood Risk Management Standard and a Process for Further Soliciting and Considering Stakeholder Input" (2015) Revised Guidelines for

  5. DOE Awards Small Business Task Order | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Order DOE Awards Small Business Task Order December 17, 2015 - 10:00am Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati - The Department of Energy (DOE) today announced the award of a Firm-Fixed Unit Rate Task Order to Sage Energy Trading of Jenks, OK. Sage Energy Trading is a Woman Owned Small Business. The Task Order will have a maximum value of $3.5 million over 2 years. Work performed under this Task Order will be performed at the Portsmouth Gaseous

  6. Environmental Justice Activities: Tribal Training Complies with DOE Order

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    144.1 and EO 12898 for Environmental Justice | Department of Energy Environmental Justice Activities: Tribal Training Complies with DOE Order 144.1 and EO 12898 for Environmental Justice Environmental Justice Activities: Tribal Training Complies with DOE Order 144.1 and EO 12898 for Environmental Justice October 13, 2015 - 2:23pm Addthis What does this project do? Goal 1. Protect human health and the environment. Following the Environmental Justice and Tribal Consultation Training session on

  7. DOE Order 440. 1 B: Worker Protection Program for DOE (Including NNSA)

    Office of Environmental Management (EM)

    Federal Employees | Department of Energy 0. 1 B: Worker Protection Program for DOE (Including NNSA) Federal Employees DOE Order 440. 1 B: Worker Protection Program for DOE (Including NNSA) Federal Employees Stakeholders: DOE and NNSA employees Scope: DOE Order 440.1 B establishes the framework for an effective worker protection program that will reduce or prevent injuries, illnesses, and accidental losses by providing Department of Energy, including National Nuclear Security Administration

  8. American Indian Policy and Relevant DOE and Executive Orders | Department

    Energy Savers [EERE]

    of Energy Tribal Programs » American Indian Policy and Relevant DOE and Executive Orders American Indian Policy and Relevant DOE and Executive Orders Over the course of American history, the Federal government's relationship with Indian Tribes has been defined and modified by treaties, executive orders, court decisions, specific legislation passed by Congress, and regulations. Important rights were guaranteed to Tribes by treaty, with many of these rights still enforceable today. Case law,

  9. DOE Assistance on EPA MATS Rule and CSAPR Implementation Options

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) is offering technical assistance to state public utility commissioners, generation owner/operators, and utilities on implementing the new and pending EPA air...

  10. Memorandum: Direction and Guidance for Implementing Direct DOE Relationship

    Office of Environmental Management (EM)

    & Funding for the EMSSAB | Department of Energy Direction and Guidance for Implementing Direct DOE Relationship & Funding for the EMSSAB Memorandum: Direction and Guidance for Implementing Direct DOE Relationship & Funding for the EMSSAB From: Designated Federal Officer, Sandra L. Waisley (EM-11) To: SSAB Members (G. Stegner, J. Reising, G. Bowman, T. Taylor, C. Gertz, B. Murphie, S. McCracken, M. Marvin, J. Rampe, A. Doswell, C. Anderson, B. Wethington, S. Brennan, K. Kozeliski,

  11. DOE Orders Mirant Power Plant to Operate Under Limited Circumstances |

    Energy Savers [EERE]

    Department of Energy Orders Mirant Power Plant to Operate Under Limited Circumstances DOE Orders Mirant Power Plant to Operate Under Limited Circumstances Docket No. EO-05-01. Order No. 202-05-3: Secretary of Energy Samuel W. Bodman today issued an order requiring Mirant Corporation's Potomac River Generating Station in Alexandria, Virginia (Mirant) to immediately resume limited operation. The order will help provide electric reliability for Washington, D.C., and will do so at the lowest

  12. DOE Selects Seven Contractors for Waste Treatment Basic Ordering Agreements

    Office of Environmental Management (EM)

    | Department of Energy Seven Contractors for Waste Treatment Basic Ordering Agreements DOE Selects Seven Contractors for Waste Treatment Basic Ordering Agreements June 4, 2015 - 12:00pm Addthis Media Contact: Lynn Chafin, (513) 246-0461, lynette.chafin@emcbc.doe.gov Cincinnati - The U.S. Department of Energy (DOE) issued seven Basic Ordering Agreements (BOAs) for the treatment of Low-Level Waste (LLW) and Mixed Low-Level Waste (MLLW). The LLW MLLW treatment services also include the

  13. DOE Prepared for Implementation of Oak Ridge Transuranic Waste Processing

    Office of Environmental Management (EM)

    Center Services | Department of Energy Oak Ridge Transuranic Waste Processing Center Services DOE Prepared for Implementation of Oak Ridge Transuranic Waste Processing Center Services October 9, 2015 - 4:00pm Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati - The U.S. Department of Energy (DOE) awarded a contract on June 18, 2015 to North Wind Solutions, LLC for support services at the Oak Ridge Transuranic Waste Processing Center (TWPC) in Oak

  14. DOE Order Self Study Modules - DOE O 420.1B Facility Safety

    Broader source: Energy.gov (indexed) [DOE]

    LEARNING AND CAREER DEVELOPMENT DEPARTMENT CHANGE NO: 2 DOE O 420.1B Level: Familiar Date: 12108 1 DOE ORDER O 420.1B FACILITY SAFETY FAMILIAR LEVEL ...

  15. DOE Awards Task Order Modification for Support Services to Office...

    Energy Savers [EERE]

    The Department of Energy (DOE) today awarded a modification to Task Order DE-DT0005235 to J.G. Management Systems, Inc. of Grand Junction, CO for administrative and program...

  16. DOE Sustainability Support Information Brief on Executive Order 12898,

    Energy Savers [EERE]

    Federal Actions to Address Environmental Justice in Minority and Low-Income Populations | Department of Energy DOE Sustainability Support Information Brief on Executive Order 12898, Federal Actions to Address Environmental Justice in Minority and Low-Income Populations DOE Sustainability Support Information Brief on Executive Order 12898, Federal Actions to Address Environmental Justice in Minority and Low-Income Populations November, 2012 HS-21-IB-2012-28 This Sustainability Support

  17. DOE Awards Task Order for Lexington Project Office Audit

    Broader source: Energy.gov [DOE]

    Cincinnati - The U.S. Department of Energy (DOE) Office of Environmental Management today awarded a task order to KPMG LLP, of McLean, Virginia to perform audit services for the Portsmouth/Paducah Project Office in Lexington, Kentucky. The task order has an approximate value of $2.9 million over a two-year performance period.

  18. "Order Module--DOE O 470.4B, SAFEGUARDS AND SECURITY PROGRAM...

    Office of Environmental Management (EM)

    "Order Module--DOE O 470.4B, SAFEGUARDS AND SECURITY PROGRAM, DOE O 471.6, INFORMATION SECURITY, DOE O 473.3 "Order Module--DOE O 470.4B, SAFEGUARDS AND SECURITY PROGRAM, DOE O...

  19. Re: DOE Request for Information - Implementing the National Broadband

    Energy Savers [EERE]

    Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy | Department of Energy DTE Energy Company appreciates the opportunity to respond to the Department of Energy's (DOE) Request for Information on the subject of Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy, which was published at 75 Federal Register 26206 on May 11, 2010. PDF icon Re: DOE

  20. DOE Request for Information - Implementing the National Broadband Plan by

    Office of Environmental Management (EM)

    Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy | Department of Energy Request for Information - Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy DOE Request for Information - Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy Idaho Power Company ("Idaho Power") hereby submits the following

  1. DOE - NNSA/NFO -- Test Film Order Form

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Home > Library > Forms > Historical Test Film Order Form U.S. DOE/NNSA - Nevada Field Office Historical Test Film Order Form The Historical Nuclear Weapons Test films which have been declassified can be ordered from the Nuclear Testing Archive for a fee per video, plus shipping and handling. The form is used only to request a film(s). A representative will contact you regarding your order and payment options. Please call 702-794-5117 or 702-794-5106. You can contact us by email to

  2. DOE Orders Self-Study Program - DOE-STD-1063-2011, Facility Representatives

    Office of Environmental Management (EM)

    | Department of Energy 63-2011, Facility Representatives DOE Orders Self-Study Program - DOE-STD-1063-2011, Facility Representatives U.S. Department of Energy Orders Self-Study Program DOE-STD-1063-2011, Facility Representatives Familiar Level - August 2011 The familiar level of this module is divided into three sections. The first section addresses the purpose and scope of DOE-STD-1063-2011, the purpose of the FR program, and the duties, responsibilities, and authorities of FRs and other

  3. Implementation Guide - Performance Indicators (Metrics ) for Use with DOE O 440.2B, Aviation Management and Safety

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-09-19

    The Guide provides information regarding specific provisions of DOE O 440.2B and is intended to be useful in understanding and implementing performance indicators (metrics) required by the Order. Cancels DOE G 440.2B-1. Canceled by DOE N 251.98.

  4. Draft Revised Guidelines for Implementing Executive Order 11988...

    Energy Savers [EERE]

    review and comment on January 30, 2015. NoticeofImplementingGuidelines.pdf FEMADraftImplementingGuidelines.pdf More Documents & Publications Federal Flood Risk Management Standard...

  5. Order Module--DOE O 440.1B, WORKER PROTECTION PROGRAM FOR DOE (INCLUDING

    Energy Savers [EERE]

    NNSA) FEDERAL EMPLOYEES | Department of Energy 40.1B, WORKER PROTECTION PROGRAM FOR DOE (INCLUDING NNSA) FEDERAL EMPLOYEES Order Module--DOE O 440.1B, WORKER PROTECTION PROGRAM FOR DOE (INCLUDING NNSA) FEDERAL EMPLOYEES The familiar level of this module is divided into two sections. In the first section, we will discuss the objective, requirements, and the responsibilities assigned to the heads of field elements. In the second section, we will discuss the content of attachment 1, Functional

  6. DOE ESPC TASK ORDER REQUEST FOR PROPOSAL (TO RFP) TEMPLATE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE ESPC TASK ORDER REQUEST FOR PROPOSAL (TO RFP) TEMPLATE INSTRUCTIONS FOR USING THE TEMPLATE The TO RFP is used to communicate agency- or site-specific terms and conditions for the project to the ESCO. The DOE IDIQ contract permits such revision, per section C.1.3: C.1.3 Unless otherwise stated, all provisions that follow throughout the remaining sections of this master IDIQ contract may be revised within the overall scope of the contract, as necessary (based on the needs and regulations of

  7. DOE Orders Self-Study Program - DOE-STD-1073-2003, Configuration Management

    Office of Environmental Management (EM)

    | Department of Energy 73-2003, Configuration Management DOE Orders Self-Study Program - DOE-STD-1073-2003, Configuration Management U.S. Department of Energy Orders Self-Study Program DOE-STD-1073-2003, Configuration Management Familiar Level - August 2011 The familiar level of this module is divided into three sections. The first section covers chapters 1 through 3. The second section covers chapters 4 and 5. Chapters 6 and 7 are covered in section three. We have provided examples

  8. Attachment 1: DOE Phased Retirement Implementation Plan Purpose:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    : DOE Phased Retirement Implementation Plan Purpose: Phased retirement is designed to assist agencies with knowledge management and continuity of operations in the short term. Although the main purpose is to enhance the mentoring and training of the employees who will be filling the positions or taking on duties of more experienced retiring employees, phased retirement may also be used to provide employees with the opportunity to share experiences across Departmental elements. Phased retirement

  9. Re: DOE Request for Information - Implementing the National Broadband

    Energy Savers [EERE]

    Plan by Studying the Communications Requirements of Electric Utilities To Inform Federal Smart Grid Policy | Department of Energy To Inform Federal Smart Grid Policy Re: DOE Request for Information - Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities To Inform Federal Smart Grid Policy The Edison Electric Institute ("EEI"), on behalf of its member companies, hereby submits the following comments in response to the Request for

  10. Re: DOE Request for Information - Implementing the National Broadband

    Energy Savers [EERE]

    Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy | Department of Energy FPL hereby respectfully submits the following comments in response to the request by the Department of Energy for comments to Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities To Inform Federal Smart Grid Policy (Federal Register/Vol.75, No.90/Tuesday May 11, 2010). PDF icon Re: DOE Request for Information -

  11. Re: DOE Request for Information - Implementing the National Broadband

    Energy Savers [EERE]

    Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy | Department of Energy Exelon Corporation (Exelon) hereby submits the following comments in response to the Request for Information ("RFI")1 by the Department of Energy ("Department" or "DOE") regarding the current and future communications requirements of utilities, including, but not limited to, the requirements of the Smart Grid in an effort to implement

  12. Understanding and Implementing DOE Quality Requirements and ASME NQA-1 in

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Nuclear Projects, A Management Overview and Introduction, May 14, 2015 | Department of Energy and Implementing DOE Quality Requirements and ASME NQA-1 in DOE Nuclear Projects, A Management Overview and Introduction, May 14, 2015 Understanding and Implementing DOE Quality Requirements and ASME NQA-1 in DOE Nuclear Projects, A Management Overview and Introduction, May 14, 2015 Understanding and Implementing DOE Quality Requirements and ASME NQA-1 in DOE Nuclear Projects, A Management

  13. PII. DOE Order 206. I, Department of Energy Privacy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Identity theft harms millions of Americans every year. Breaches of personally identifiable information (PII) across the government have been well publicized and costly for individuals and Federal agencies. These breaches have prompted the Administration and Congress to take action to improve the protection of personal information. As Department of Energy employees and contractors, you have a responsibility t o protect all PII. DOE Order 206. I, Department of Energy Privacy Program, defines PI1

  14. Framework for Implementing DOE Order 144.1

    Office of Environmental Management (EM)

  15. DOE Order 144.1 – Department of Energy American Indian Tribal Government Interactions and Policy (DOE, 2009)

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Order DOE O 144.1, issued in 2009, describes Departmental, programmatic, and field responsibilities for interacting with American Indian Governments.

  16. Revised Guidelines for Implementing Executive Order 11988, "Floodplain...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    implementing guidelines explain the use of natural systems, ecosystem processes, and nature-based approaches for identifying alternatives, and provide other technical guidance ...

  17. Updated Report on Executive Order 13,392 Implementation by the...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Updated Report on Executive Order 13,392 Implementation by the Department of Energy Updated Report on Executive Order 13,392 Implementation by the Department of Energy The...

  18. Updated Report on Executive Order 13,392 Implementation

    Broader source: Energy.gov (indexed) [DOE]

    standard information on the DOE FOIA web sites by January 2007. 3. The milestone was ... B. Overall Web Improvement 1. The milestone related to the area of Overall Web Improvement ...

  19. Implementation Guide - Aviation Program Performance Indicators (Metrics) for use with DOE O 440.2B, Aviation Management And Safety

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2002-12-10

    The Guide provides information regarding Departmental expectations on provisions of DOE 440.2B, identifies acceptable methods of implementing Aviation Program Performance Indicators (Metrics) requirements in the Order, and identifies relevant principles and practices by referencing Government and non-Government standards. Canceled by DOE G 440.2B-1A.

  20. "Order Module--DOE O 470.4B, SAFEGUARDS AND SECURITY PROGRAM, DOE O 471.6,

    Office of Environmental Management (EM)

    INFORMATION SECURITY, DOE O 473.3 | Department of Energy "Order Module--DOE O 470.4B, SAFEGUARDS AND SECURITY PROGRAM, DOE O 471.6, INFORMATION SECURITY, DOE O 473.3 "Order Module--DOE O 470.4B, SAFEGUARDS AND SECURITY PROGRAM, DOE O 471.6, INFORMATION SECURITY, DOE O 473.3 The familiar level of this module is divided into four sections. In the first section, we will discuss the DOE security programs and design basis threat included in DOE O 470.4B, Safeguards and Security Program.

  1. EAC Recommendations for DOE Action Regarding Implementing Effective Enterprise Security Governance- March 2014

    Broader source: Energy.gov [DOE]

    EAC Recommendations for DOE Action Regarding Implementing Effective Enterprise Security Governance, approved at the March 12-13, 2014 meeting.

  2. Memo on Implementation of DOE O 414-1D | Department of Energy

    Energy Savers [EERE]

    on Implementation of DOE O 414-1D Memo on Implementation of DOE O 414-1D On October 20, 2008, the Department of Energy (DOE) Office of Environmental Management (EM) established its quality program through the implementation of the EM Corporate Quality Assurance (QA) Program (EM-QA-001). PDF icon Memo on Implementation of DOE O 414-1D More Documents & Publications Memo Distributing EM-QA-001 Rev 1 2012 Quality Assurance Improvement Project Plan

  3. DOE National Environmental Policy Act Implementing Procedures (10 CFR Part 1021) [DOE][2012]

    Office of Environmental Management (EM)

    0 CFR PART 1021 - NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES DEPARTMENT OF ENERGY Authority: 42 U.S.C. 7101 et seq.; 42 U.S.C. 4321 et seq.; 50 U.S.C. 2401 et seq. Subpart A-General § 1021.100 Purpose. The purpose of this part is to establish procedures that the Department of Energy (DOE) shall use to comply with section 102(2) of the National Environmental Policy Act (NEPA) of 1969 (42 U.S.C. 4332(2)) and the Council on Environmental Quality (CEQ) regulations for implementing

  4. Preparing for Implementation of DOE O 435.1 at Hanford

    SciTech Connect (OSTI)

    FRITZ, D.W.

    2000-02-01

    Implementation of a new DOE Order at a complex site like Hanford is not as simple as just stating that the Order is to be followed. There are contractual changes, interface adjustments and institutional obstacles to overcome that all must be properly analyzed and dealt with before the actual physical changes embodied in the new requirements can be put into practice. In planning for these changes associated with the new DOE 0 435.1 ''Radioactive Waste Management'', the Richland Operations Office (RL) of the U.S. Department of Energy is attempting to make an orderly and efficient transition to the new Order requirements. In so doing, RL is tasking the Management and Integration contractor for the Project Hanford Management Contract (PHMC) held by Fluor Daniel Hanford (FDH) to coordinate the planning and integration efforts necessary to ensure that resources needed to implement the new requirements are identified and plans for implementation completed within the first year after issuance of the Order. Implementation at Hanford is complicated not only by the relatively complex contract situation with the PHMC under FDH and its major subcontractors, the Environmental Remediation Contract (under Bechtel), and the Pacific Northwest National Laboratory (run by Battelle), but also by the newly created Office of River Protection (ORP) which reports directly to EM-1, and not to the Hanford site RL Manager. Despite the obstacles, however, Hanford is making a concerted effort to effectively implement the new requirements, while maximizing use of existing systems, processes and documentation. This paper describes the process and experiences Hanford has developed to accomplish this objective. The interested audience will include others involved in implementation of new DOE Order 435.1 and others interested in the workings of large federal installations such as Hanford. This paper concludes that through use of planning, communications and participation of involved parties, complex new requirements can be appropriately evaluated, analyzed and approaches for their implementation developed and successfully put into place. The approach taken by Hanford to accomplish this mission is set forth in this paper, and lessons learned along the way are described.

  5. Frequently Asked Questions Regarding DOE Order 420.1C, Facility Safety |

    Office of Environmental Management (EM)

    Department of Energy Frequently Asked Questions Regarding DOE Order 420.1C, Facility Safety Frequently Asked Questions Regarding DOE Order 420.1C, Facility Safety February 9, 2016 Frequently Asked Questions Regarding DOE Order 420.1C, Facility Safety, and its supporting directives, DOE-STD-1020-2012, Natural Phenomena Hazards Analysis and Design Criteria for DOE Facilities, and DOE-STD-1066-2012, Fire Protection. PDF icon Frequently Asked Questions Regarding DOE Order 420.1C, Facility Safety

  6. Order Module--DOE Order 225.1B, ACCIDENT INVESTIGATIONS

    Broader source: Energy.gov [DOE]

    DOE O 225.1B prescribes organizational responsibilities, authorities, and requirements for conducting investigations of certain accidents occurring at DOE sites, facilities, areas, operations, and...

  7. Order Module--DOE-HDBK-1203-97, GUIDE TO GOOD PRACTICES FOR TRAINING...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    areas of design, development, and implementation of examinations; section three, ... More Documents & Publications DOE-STD-1037-93 FAQS Gap Analysis Qualification Card - ...

  8. EVMS Training Snippet: 1.1 DOE Order 413.3B EVM Requirements...

    Energy Savers [EERE]

    1 DOE Order 413.3B EVM Requirements EVMS Training Snippet: 1.1 DOE Order 413.3B EVM Requirements This EVMS Training Snippet, sponsored by the Office of Project Management (PM),...

  9. DOE Order 435.1- Performance Assessments and Waste Incidental to Reprocessing Evaluations

    Broader source: Energy.gov [DOE]

    This page focuses on DOE Order 435.1, Performance Assessments and Waste Incidental to Reprocessing Evaluations.

  10. Briefing, DOE Order 475.2B, Identifying Classified Information, What Derivative Classifiers Should Know

    Broader source: Energy.gov [DOE]

    This briefing provides Derivative Classifiers with information regarding the changes to the DOE Order on Identifying Classified Information.

  11. Text Processing an Order or Guide - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    an Order or Guide Processing a Policy or Notice Processing an Order or Guide Canceling a Directive by Website Administrator Development from justification memorandum through review...

  12. DOE Order 442.1 A: Department of Energy Employee Concerns Program |

    Office of Environmental Management (EM)

    Department of Energy 2.1 A: Department of Energy Employee Concerns Program DOE Order 442.1 A: Department of Energy Employee Concerns Program Stakeholders: DOE employees Scope: DOE Order 442.1A established the Department of Energy (DOE) Employee Concerns Program (ECP) that ensures employee concerns related to such issues as the environment, safety, health, and management of DOE and the National Nuclear Security Administration (NNSA) programs and facilities are addressed. Summary: The Employee

  13. Secretary Chu Announces Steps to Implement Cool Roofs at DOE and Across the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Government | Department of Energy Steps to Implement Cool Roofs at DOE and Across the Federal Government Secretary Chu Announces Steps to Implement Cool Roofs at DOE and Across the Federal Government July 19, 2010 - 12:00am Addthis Washington - U.S. Department of Energy Secretary Steven Chu today announced a series of initiatives underway at the Department of Energy to more broadly implement cool roof technologies on DOE facilities and buildings across the federal government. Cool

  14. Implementing Arrangement Between DOE and METI on R&D Cooperation on Clean

    Office of Environmental Management (EM)

    Energy Technology - April 2015 | Department of Energy Implementing Arrangement Between DOE and METI on R&D Cooperation on Clean Energy Technology - April 2015 Implementing Arrangement Between DOE and METI on R&D Cooperation on Clean Energy Technology - April 2015 PDF icon Implementing Arrangement Between DOE and METI Concerning R&D Cooperation on Clean Energy Technology April 2015 More Documents & Publications Memorandum of Understanding - U.S.-UK Collaboration in Fossil

  15. Comparative Analysis Between US NRC Requirements and US DOE Orders - 13402

    SciTech Connect (OSTI)

    Chakraborti, Sayan; Stone, Lynn; Hyatt, Jeannette

    2013-07-01

    Small modular reactor (SMR) is a nuclear reactor design approach that is expected to herald in a new era of clean energy in the U.S. These reactors are less than one-third the size of conventional large nuclear power reactors, and have factory-fabricated components that may be transported by rail or truck to a site selected to house a small nuclear reactor. To facilitate the licensing of these smaller nuclear reactor designs, the Nuclear Regulatory Commission (NRC) is in the process of developing a regulatory infrastructure to support licensing review of these unique reactor designs. As part of these activities, the NRC has been meeting with the Department of Energy (DOE) and with individual SMR designers to discuss potential policy, licensing, and key technical differences in SMR designs. It is anticipated by the NRC that such licensing interaction and guidance early in the design process will contribute towards minimizing complexity while adding stability and predictability in the licensing and subsequent regulation of new reactor designs such as SMRs. In conjunction with the current NRC initiative of developing the SMR licensing process, early communication and collaboration in the identification and resolution of any potential technical and licensing differences between NRC requirements and similar requirements applicable at DOE sites would help to expedite demonstration and implementation of SMR technology in the US. In order to foster such early communication, Savannah River Nuclear Solutions (SRNS) has begun taking the first steps in identifying and evaluating potential licensing gaps that may exist between NRC and DOE requirements in siting SMRs at DOE sites. A comparison between the existing NRC regulations for Early Site Permits and the DOE Orders was undertaken to establish the degree of correlation between NRC requirements and compliance methods in place at DOE sites. The ability to use existing data and information to expedite the development of the Environmental Report is being evaluated at the Savannah River Site as a case study for application across the DOE Complex. This paper will present areas of direct correlation as well as those where the need for site specific data for either DOE operations or NRC compliance warrant additional interaction between the agencies. Areas where further refinement of the SMR technologies may drive collaborative development of revised regulations through such means as industry consensus standards will also be highlighted. Both NRC and DOE have requirements that mandate public involvement in their processes. The importance and value of early engagement with the public as well as collaborating regulatory agencies is of critical importance when deploying new technologies. (authors)

  16. DOE Awards Small Business Task Order for Technical Support to...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of Environmental Management July 1, 2013 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 bill.taylor@srs.gov Cincinnati - The Department of Energy (DOE) today...

  17. DOE Awards Small Business Task Order for Technical Support to...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management July 1, 2013 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 bill.taylor@srs.gov Cincinnati - The Department of Energy (DOE) today awarded a task ...

  18. DOE Prepared for Implementation of Oak Ridge Transuranic Waste...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE is now prepared to start transition to the primarily Firm-Fixed-Price (FFP) contract. ... Quantity (IDIQ) CLIN. The primarily FFP nature of the contract will allow DOE to shift ...

  19. Implementation of Department of Energy Oversight Policy - DOE...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the public, workers, environment, and national security assets effectively through continuous improvement. Cancels DOE O 226.1. Canceled by DOE O 226.1B o2261a.pdf -- PDF...

  20. Comments from Google Inc. on DOE Request for Information-Implementing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    other agencies on implementation of the National Broadband Plan and other efforts to empower energy consumers. PDF icon Comments from Google Inc. on DOE Request for...

  1. DOE Order Self Study Modules - DOE O 414.1D Quality Assurance

    Office of Environmental Management (EM)

    14.1D QUALITY ASSURANCE DOE O 414.1D Familiar Level August 2011 1 DOE O 414.1D QUALITY ASSURANCE FAMILIAR LEVEL ...

  2. Processing an Order or Guide - DOE Directives, Delegations, and...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Breadcrumb >> Breadcrumb Processing an Order or Guide by Website Administrator Text version available here Document Actions Justification Memorandum Initial Draft Coordination:...

  3. Re: DOE Request for Information - Implementing the National Broadband...

    Energy Savers [EERE]

    of Electric Utilities to Inform Federal Smart Grid Policy, which was published at 75 Federal Register 26206 on May 11, 2010. PDF icon Re: DOE Request for Information -...

  4. DOE Awards Small Business Task Order for Technical Support to the Office of Environmental Management

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today awarded a task order for technical support services to Boston Government Services, LLC of Lenoir City, Tennessee for support services to the DOE Office of Environmental Management.

  5. Order Module--DOE O 460.1C, PACKAGING AND TRANSPORTATION SAFETY...

    Office of Environmental Management (EM)

    60.1C, PACKAGING AND TRANSPORTATION SAFETY, DOE O 460.2A, DEPARTMENTAL MATERIALS TRANSPORTATION AND PACKAGING MANAGEMENT Order Module--DOE O 460.1C, PACKAGING AND TRANSPORTATION...

  6. Re: DOE Request for Information - Implementing the National Broadband...

    Energy Savers [EERE]

    to Inform Federal Smart Grid Policy Smart Grid Investments Improve Grid Reliability, Resilience, and Storm Responses (November 2014) Re: Implementing the National Broadband Plan by...

  7. DOE Handbook: Implementing Activity-level Work Planning & Control...

    Office of Environmental Management (EM)

    Work Planning & Control at Nuclear Facilities May 16, 2013 Presenter: James Winter, NA-00-10 Topics Covered: Project Justification Statement Improved Implementation of...

  8. Senior Managers' Implementation Guide for Use with DOE O 450.1, Environmental Protection Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-10-25

    This Guide provides a summary description of environmental management systems (EMSs) for DOE senior managers, including their responsibilities as they apply to the successful implementation of an Integrated Safety Management Systems/EMS and the expected benefits to be derived from such implementation. Canceled by DOE N 251.82.

  9. Order Module--DOE O 451.1B, NATIONAL ENVIRONMENTAL POLICY ACT COMPLIANCE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PROGRAM | Department of Energy Order Module--DOE O 451.1B, NATIONAL ENVIRONMENTAL POLICY ACT COMPLIANCE PROGRAM Order Module--DOE O 451.1B, NATIONAL ENVIRONMENTAL POLICY ACT COMPLIANCE PROGRAM DOE O 451.1B, National Environmental Policy Act Compliance Program, replaces DOE O 451.1A of the same name. DOE O 451.1B is ten pages long. Due to the concise nature of this Order, this module will be limited to one level. To complete this module and satisfy the requirements for qualification 1. Obtain

  10. Ordering Information | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Ordering Information New Brunswick Laboratory (NBL) NBL Home About Programs Certified Reference Materials (CRMs) Prices and Certificates Ordering Information Training NEPA Documents News Safety Data Sheets (SDS) for New Brunswick Laboratory Certified Reference Materials (CRM) Contact Information New Brunswick Laboratory U.S. Department of Energy Building 350 9800 South Cass Avenue Argonne, IL 60439-4899 P: (630) 252-2442 (NBL) P: (630) 252-2767 (CRM sales) F: (630) 252-6256 E: Email Us Certified

  11. DOE Awards Task Order Modification for Support Services to Office of

    Energy Savers [EERE]

    Environmental Management | Department of Energy Task Order Modification for Support Services to Office of Environmental Management DOE Awards Task Order Modification for Support Services to Office of Environmental Management March 11, 2013 - 12:00pm Addthis Media Contact Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Cincinnati - The Department of Energy (DOE) today awarded a modification to Task Order DE-DT0005235 to J.G. Management Systems, Inc. of Grand Junction, CO for

  12. DOE Order 144.1: Department of Energy American Indian Tribal Government

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interactions and Policy (2009) | Department of Energy Order 144.1: Department of Energy American Indian Tribal Government Interactions and Policy (2009) DOE Order 144.1: Department of Energy American Indian Tribal Government Interactions and Policy (2009) Communicates Departmental, programmatic, and field responsibilities for interacting with American Indian Governments and transmits the Department of Energy's (DOE) American Indian and Alaska Native Tribal Government Policy. DOE Order 144.1

  13. DOE Awards Small Business Task Order for Technical Support to the Office of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Management | Department of Energy Order for Technical Support to the Office of Environmental Management DOE Awards Small Business Task Order for Technical Support to the Office of Environmental Management June 27, 2013 - 12:00pm Addthis Media Contact Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Cincinnati - The Department of Energy (DOE) today awarded a task order for technical support services to TerranearPMC, LLC of Exton, Pennsylvania for support services to the

  14. DOE Order Self Study Modules - DOE G 441.1-1C Radiation Protection...

    Broader source: Energy.gov (indexed) [DOE]

    LEARNING AND CAREER DEVELOPMENT DEPARTMENT Change No: 1 DOE G 441.1-1C Level: Familiar Date: 12108 1 DOE G 441.1-1C, RADIATION PROTECTION PROGRAMS GUIDE FAMILIAR LEVEL ...

  15. DOE Order Self Study Modules - DOE O 451.1B National Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    POLICY ACT COMPLIANCE PROGRAM ALBUQUERQUE OPERATIONS OFFICE Change No: 1 DOE O 451.1B Level: Familiar Date: 61501 1 DOE O 451.1B NATIONAL ENVIRONMENTAL POLICY ACT...

  16. DOE Handbook: Implementing Activity-level Work Planning & Control at

    Office of Environmental Management (EM)

    Nuclear Facilities | Department of Energy Handbook: Implementing Activity-level Work Planning & Control at Nuclear Facilities DOE Handbook: Implementing Activity-level Work Planning & Control at Nuclear Facilities May 16, 2013 Presenter: James Winter, NA-00-10 Topics Covered: Project Justification Statement Improved Implementation of WP&C and Activity-level Work Effectively Meeting Requirements of ISM at the Activity Level Developing a Resource to Clarify DOE Requirements that

  17. Evaluation of the Cask Transportation Facility Modifications (CTFM) compliance to DOE order 6430.1A

    SciTech Connect (OSTI)

    ARD, K.E.

    1999-07-14

    This report was prepared to evaluate the compliance of Cask Transportation Facility Modifications (CTFM) to DOE Order 6430.1A.

  18. DOE Order 458.1 Property Clearance Requirements and Factors Considered...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Factors Considered to Update Its Clearance Limits DOE Order 458.1 Property Clearance Requirements and Factors Considered to Update Its Clearance Limits Carlos Corredor, ...

  19. Implementation of Department of Energy Oversight Policy - DOE...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the public, workers, environment, and national security assets effectively through continuous improvement. Supersedes DOE O 226.1A. o2261b4-25-11.pdf -- PDF Document, 117 KB...

  20. Updated Report on Executive Order 13,392 Implementation by the Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy | Department of Energy Updated Report on Executive Order 13,392 Implementation by the Department of Energy Updated Report on Executive Order 13,392 Implementation by the Department of Energy The President issued Executive Order 13,392, entitled "Improving Agency Disclosure of Information," on December 14,2005. The Executive Order established an approach to administration of the Freedom of Information Act that was "citizen-centered" and "results-oriented.''

  1. A Review of the Department of Energy's Implementation of Executive Order

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    12898 and Recommendations for a Second Five-Year Strategic Plan | Department of Energy A Review of the Department of Energy's Implementation of Executive Order 12898 and Recommendations for a Second Five-Year Strategic Plan A Review of the Department of Energy's Implementation of Executive Order 12898 and Recommendations for a Second Five-Year Strategic Plan At the request of the U.S Department of Energy's Office of Legacy Management, the Medical University of South Carolina (MUSC) performed

  2. Accelerator Facility Safety Implementation Guide for DOE O 420.2B, Safety of Accelerator Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-07-01

    This document is an aid to understanding and meeting the requirements of DOE O 420.2B, Safety of Accelerator Facilities, dated 7/23/04. It does not impose requirements beyond those stated in that Order or any other DOE Order. No cancellation.

  3. Implementation Guide for Use with DOE O 450.1, Environmental Protection Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-10-24

    This Guide provides background information, an overview of the integration process and guidance relating to the preliminary steps that DOE sites should undertake in order to meet the requirements of DOE O 450.1. Canceled by DOE N 251.96. Cancels DOE G 450.1-1.

  4. DOE Orders AeroSys to Halt Distribution of Inefficient Air Conditioner...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Orders AeroSys to Halt Distribution of Inefficient Air Conditioner and Heat Pump Models DOE Orders AeroSys to Halt Distribution of Inefficient Air Conditioner and Heat Pump Models ...

  5. Microsoft Word - doe_mirant_order_sierraclub.doc

    Office of Environmental Management (EM)

    20 th , 2006 Mr. Lawrence Mansueti Permitting, Siting, and Analysis Division Office of Electricity Delivery and Energy Reliability Department of Energy 1000 Independence Avenue, SW Washington, DC 20585-0119 Dear Mr. Mansueti, This letter is in response to the Department of Energy Emergency Order to Resume Limited Operation at the Potomac River Generating Station, Alexandria, VA, in Response to Electricity Reliability Concerns in Washington, DC. For over 50 years, and as indicated by Mirant's own

  6. Order Module--DOE O 451.1B, NATIONAL ENVIRONMENTAL POLICY ACT...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE O 451.1B, National Environmental Policy Act Compliance Program, replaces DOE O 451.1A of the same name. DOE O 451.1B is ten pages long. Due to the concise nature of this Order, ...

  7. DOE Order Self Study Modules - DOE O 435.1 Radioactive Waste Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    35.1 RADIOACTIVE WASTE MANAGEMENT ALBUQUERQUE OPERATIONS OFFICE Change No: 0 DOE O 435.1 Level: Familiar Date: 6/15/01 1 DOE O 435.1 RADIOACTIVE WASTE MANAGEMENT FAMILIAR LEVEL _________________________________________________________________________ OBJECTIVES Given the familiar level of this module and the resources listed below, you will be able to 1. Discuss the purpose and scope of DOE O 435.1, Radioactive Waste Management. Note: If you think that you can complete the practice at the end of

  8. DOE Order Self Study Modules - DOE O 151.1C Comprehensive Emergency Management System

    Office of Environmental Management (EM)

    O 151.1C COMPREHENSIVE EMERGENCY MANAGEMENT SYSTEM NATIONAL NUCLEAR SECURITY ADMINISTRATION SERVICE CENTER Change No: 3 DOE O 151.1C Level: Familiar Date: 12/1/08 1 DOE O 151.1C COMPREHENSIVE EMERGENCY MANAGEMENT SYSTEM FAMILIAR LEVEL _________________________________________________________________________ OBJECTIVES Given the familiar level of this module and the resources listed below, you will be able to: 1. List the objectives of DOE O 151.1C, Comprehensive Emergency Management System

  9. DOE Order Self Study Modules - DOE O 442.1 Department of energy Employee Concerns Program

    Office of Environmental Management (EM)

    2.1 DEPARTMENT OF ENERGY EMPLOYEE CONCERNS PROGRAM ALBUQUERQUE OPERATIONS OFFICE Change No: 0 DOE O 442.1 Level: Familiar Date: 6/15/01 1 DOE O 442.1 DOE EMPLOYEE CONCERNS PROGRAM FAMILIAR LEVEL _________________________________________________________________________ OBJECTIVES Given the familiar level of this module and the resources listed below, you will be able to perform the following: 1. State three examples of criteria that should be used to assess the significance of an employee's

  10. Implementation of Department of Energy Order 580.1, Department of Energy

    Energy Savers [EERE]

    Personal Property Management | Department of Energy Department of Energy Order 580.1, Department of Energy Personal Property Management Implementation of Department of Energy Order 580.1, Department of Energy Personal Property Management Department of Energy Personal Property Management More Documents & Publications Personal Property Briefings Inspection Report: IG-0859 AL2007-05.doc�

  11. Minutes from 12 December 2006 DOE/NRC Video Teleconference Call on Section 3116 Implementation Activities

    Office of Environmental Management (EM)

    12 December 2006 DOE/NRC Video Teleconference Call on Section 3116 Implementation Activities Attendees: Representatives from DOE-Savannah River (DOE-SR), DOE-Headquarters (DOE-HQ), and the U.S. Nuclear Regulatory Commission (NRC) participated in a video teleconference call from 2:00 - 4:00 on 14 December 2006. A conference phone line was planned for other DOE field office participation (Idaho, West Valley, Office of River Protection), U.S. Environmental Protection Agency, Region IV (EPA-IV), and

  12. Department of Energy Technical Standards Program - Order DOE 1300.2A

    Office of Environmental Management (EM)

    Washington, D.C. SUBJECT: DEPARTMENT OF ENERGY ORDER DOE 1300.2A 5-19-92 TECHNICAL STANDARDS PROGRAM 1. 2. 3. 4. 5. PURPOSE. This Order sets forth policy, assigns responsibility, and provides requirements for development and application of technical standards in Department of Energy (DOE) facilities, programs, and projects; provides for participation in non-Government standards bodies (NGSBS); for establishment of a DOE Technical Standards Program; and assigns the responsibility for the

  13. Re: DOE Request for Information - Implementing the National Broadband

    Energy Savers [EERE]

    Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy | Department of Energy The Edison Electric Institute ("EEI"), on behalf of its member companies, hereby submits the following reply comments in response to the Request for Information ("RFI") by the Department of Energy ("Department" or "DOE") regarding the current and future communications requirements of utilities, including, but not limited to,

  14. Reply comments to DOE Request for Information-Implementing the National

    Energy Savers [EERE]

    Broadband Plan by Empowering Customers and the Smart Grid: Data Access, Third Party Use, and Privacy | Department of Energy comments to DOE Request for Information-Implementing the National Broadband Plan by Empowering Customers and the Smart Grid: Data Access, Third Party Use, and Privacy Reply comments to DOE Request for Information-Implementing the National Broadband Plan by Empowering Customers and the Smart Grid: Data Access, Third Party Use, and Privacy Reply comments from Southern

  15. Comments from Google Inc. on DOE Request for Information-Implementing the

    Office of Environmental Management (EM)

    National Broadband Plan by Empowering Customers and the Smart Grid: Data Access, Third Party Use, and Privacy | Department of Energy from Google Inc. on DOE Request for Information-Implementing the National Broadband Plan by Empowering Customers and the Smart Grid: Data Access, Third Party Use, and Privacy Comments from Google Inc. on DOE Request for Information-Implementing the National Broadband Plan by Empowering Customers and the Smart Grid: Data Access, Third Party Use, and Privacy

  16. Introduction to DOE Order 435.1 Low Level Radioactive Waste Disposal

    Energy Savers [EERE]

    Requirements | Department of Energy Introduction to DOE Order 435.1 Low Level Radioactive Waste Disposal Requirements Introduction to DOE Order 435.1 Low Level Radioactive Waste Disposal Requirements Christine Gelles*, U.S. Department of Energy ; Edward Regnier, U.S. Department of Energy; Andrew Wallo, U.S. Department of Energy Abstract: The Atomic Energy Act gives the U.S. Department of Energy (US DOE), the authority to regulate the management of radioactive waste generated by US DOE. This

  17. Letter to Mr. Podonsky from DOE and Contractor Attorneys' Association concerning 10 CFR 851 implementation issues, May 21, 2007

    Broader source: Energy.gov [DOE]

    Memorandum to Mr. Podonsky from DOE and Contractor Attorneys' Association concerning 10 CFR 851 implementation issues, May 21, 2007

  18. Order Module--DOE-HDBK-1203-97, GUIDE TO GOOD PRACTICES FOR TRAINING OF

    Energy Savers [EERE]

    TECHNICAL STAFF AND MANAGERS, DOE-HDBK-1204-97, GUIDE TO GOOD PRACTICES FOR THE DEVELOPMENT OF TEST ITEMS,DOE-HDBK-1205-97, GUIDE TO GOOD PRACTICES FOR THE DESIGN, DEVELOPMENT | Department of Energy HDBK-1203-97, GUIDE TO GOOD PRACTICES FOR TRAINING OF TECHNICAL STAFF AND MANAGERS, DOE-HDBK-1204-97, GUIDE TO GOOD PRACTICES FOR THE DEVELOPMENT OF TEST ITEMS,DOE-HDBK-1205-97, GUIDE TO GOOD PRACTICES FOR THE DESIGN, DEVELOPMENT Order Module--DOE-HDBK-1203-97, GUIDE TO GOOD PRACTICES FOR

  19. Institutional Controls Implementation Guide for Use with DOE P 454.1, Use of Institutional Controls

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-10-14

    This Guide provides information to assist Department of Energy program and field offices in understanding what is necessary and acceptable for implementing the provisions of DOE P 454.1, Use of Institutional Controls. Does not cancel/supersede other directives. Certified 1-28-11.

  20. Listing of DOE/FE Authorizations/Orders Issued in 2015 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Listing of DOE/FE Authorizations/Orders Issued in 2015 Listing of DOE/FE Authorizations/Orders Issued in 2015 The following chart contains all Orders issued by the Office of Natural Gas Regulatory Activities in 2015 thru December 16th. The orders include all new or renewed authority to Import and Export Natural Gas and/or Liquefied Natural Gas, as well as all procedural orders; i.e., vacates, name changes. To download applications, click here and select the "View (blankets), PDF

  1. DOE Takes Steps to Implement the National Broadband Plan | Department of

    Office of Environmental Management (EM)

    Energy Takes Steps to Implement the National Broadband Plan DOE Takes Steps to Implement the National Broadband Plan May 11, 2010 - 12:54pm Addthis The Department of Energy has announced that it is taking steps to implement energy-related recommendations included in the National Broadband Plan, released by the Federal Communications Commission (FCC) in March. The plan included recommendations on a wide range of topics from expanding internet access to modernizing health information to

  2. DOE Order 458.1 Radiation Protection of the Public and the Environment

    Office of Environmental Management (EM)

    Order 458.1 Radiation Protection of the Public and the Environment Environmental Radiological Assistance Directory (ERAD) Webinar May 2, 2012 Carlos Corredor Office of Health, Safety and Security U.S. Department of Energy 1 Why Was DOE 5400.5 Updated * Consistency with 10 CFR Part 835: DOE's Occupational Radiation Protection Rule amended Jun 07. * To reflect: - Current radiation protection concepts. - Technical standards and practices recommendations : i.e. ICRP and NCRP. * Consistency with DOE

  3. Order Module--DOE O 231.1B, ENVIRONMENT, SAFETY, AND HEALTH REPORTING |

    Energy Savers [EERE]

    Department of Energy 231.1B, ENVIRONMENT, SAFETY, AND HEALTH REPORTING Order Module--DOE O 231.1B, ENVIRONMENT, SAFETY, AND HEALTH REPORTING To ensure the DOE receives timely and accurate information about events that have affected or could adversely affect the health, safety, and security of the public or workers, the environment, the operations of DOE facilities, or the credibility of the Department. This will be accomplished through timely collection, reporting, analysis, and

  4. Canister storage building compliance assessment DOE Order 6430.1A, General Design Criteria

    SciTech Connect (OSTI)

    BLACK, D.M.

    1999-08-12

    This document presents the Project's position on compliance with DOE Order 6430.1A ''General Design Criteria.'' No non-compliances are shown. The compliance statements have been reviewed and approved by DOE. Open items are scheduled to be closed prior to project completion.

  5. Introduction to DOE Order 435.1 Low Level Radioactive Waste Disposal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Introduction to DOE Order 435.1 Low Level Radioactive Waste Disposal Requirements Christine Gelles*, U.S. Department of Energy ; Edward Regnier, U.S. Department of Energy; Andrew ...

  6. DOE Orders AeroSys to Halt Distribution of Inefficient Air Conditioner...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AeroSys to Halt Distribution of Inefficient Air Conditioner and Heat Pump Models Shown to Violate Minimum Efficiency Standards DOE Orders AeroSys to Halt Distribution of ...

  7. Order Module--DOE O 151.1C, COMPREHENSIVE EMERGENCY MANAGEMENT...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    151.1C, COMPREHENSIVE EMERGENCY MANAGEMENT SYSTEM Order Module--DOE O 151.1C, COMPREHENSIVE EMERGENCY MANAGEMENT SYSTEM The familiar level of this module is designed to summarize...

  8. Order Module--DOE O 425.1D, VERIFICATION OF READINESS TO START...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5.1D, VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES Order Module--DOE O 425.1D, VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES "The ...

  9. Order Module--DOE O 414.1D, QUALITY ASSURANCE | Department of Energy

    Energy Savers [EERE]

    14.1D, QUALITY ASSURANCE Order Module--DOE O 414.1D, QUALITY ASSURANCE "To ensure that DOE, including NNSA, products and services meet or exceed customers' requirements and expectations. To achieve quality for all work based upon the following principles: All work, as defined in this Order, is conducted through an integrated and effective management system. Management support for planning, organization, resources, direction, and control is essential to quality assurance (QA). Performance

  10. "Order Module--DOE O 442.1, DEPARTMENT OF ENERGY EMPLOYEE CONCERNS PROGRAM

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy "Order Module--DOE O 442.1, DEPARTMENT OF ENERGY EMPLOYEE CONCERNS PROGRAM "Order Module--DOE O 442.1, DEPARTMENT OF ENERGY EMPLOYEE CONCERNS PROGRAM The familiar level of this module is divided into two sections. In the first section, we will discuss the objectives, requirements, responsibilities, and definitions that are contained in the Order. In the second section, we will discuss the Guide. There is only one level of instruction for this Order. You will

  11. Policy Flash 2014-40 Implementation of DOE O 580.1A, DOE Energy...

    Broader source: Energy.gov (indexed) [DOE]

    Questions may be referred to Scott Whiteford (202) 287-1563 or scott.whiteford@hq.doe.gov POLICYFLASHFinal.pdf More Documents & Publications Policy Flashes 2014 Personal Property...

  12. Policy Flash 2014-30 DOE Order 412.1a, Work Authorization System

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Administrative Change | Department of Energy 0 DOE Order 412.1a, Work Authorization System Administrative Change Policy Flash 2014-30 DOE Order 412.1a, Work Authorization System Administrative Change Questions concerning this policy flash should be directed to Mike Dombrowski, of the Office of Acquisition and Project Management Policy at 202-287-1828 or at michael.dombrowski@hq.doe.gov. PDF icon POLICY_FLASH_Work Authorization System Admin Chg.pdf PDF icon o412 1A_AdminChg11.pdf More

  13. ORISE: The Value of Independence, a white paper on DOE Order 458.1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Value of Independence ORISE white paper explains how DOE Order 458.1 brings independent verification to the forefront of D&D projects With the release of DOE Order 458.1 in February 2011, the U.S. Department of Energy has made independent verification an official requirement for contractors involved in decontamination and decommissioning (D&D) projects at former nuclear sites operated by DOE. In the white paper The Value of Independence (PDF, 500KB), ORISE provides more background on

  14. ORDER

    Energy Savers [EERE]

    PP&L EnergyPlus Company Order No. EA-210 I. BACKGROUND Exports of electricity from the United States to a foreign country are regulated and require authorization under section 202(e) of the Federal Power Act (FPA) (16 U.S.C. §824a(e)). On May 4, 1999, PP&L EnergyPlus Company (PP&L EnergyPlus) applied to the Office of Fossil Energy (FE) of the Department of Energy (DOE) for authorization to transmit electric energy to Canada as a power marketer. PP&L EnergyPlus, a limited

  15. DOE Awards Small Business Task Order for Technical Support to the Office of

    Energy Savers [EERE]

    Environmental Management | Department of Energy Order for Technical Support to the Office of Environmental Management DOE Awards Small Business Task Order for Technical Support to the Office of Environmental Management July 1, 2013 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 bill.taylor@srs.gov Cincinnati - The Department of Energy (DOE) today awarded a task order for technical support services to TerranearPMC, LLC of Exton, PA to provide Spent Nuclear Fuel and Excess Nuclear

  16. Order Module--DOE O 420.2B, SAFETY OF ACCELERATOR FACILITIES | Department

    Energy Savers [EERE]

    of Energy 2B, SAFETY OF ACCELERATOR FACILITIES Order Module--DOE O 420.2B, SAFETY OF ACCELERATOR FACILITIES This module will discuss the objectives and requirements associated with the Order and the contractor requirements document. We have provided an example to help familiarize you with the material. The example will also help prepare you for the practice at the end of this module and for the criterion test. Before continuing, you should obtain a copy of the Order at DOE Directives,

  17. DOE Awards Task Order for Disposal of Los Alamos National Lab Waste |

    Office of Environmental Management (EM)

    Department of Energy Task Order for Disposal of Los Alamos National Lab Waste DOE Awards Task Order for Disposal of Los Alamos National Lab Waste November 13, 2013 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 bill.taylor@srs.gov Cincinnati - The Department of Energy (DOE) today awarded a task order in support of the Los Alamos National Laboratory Legacy Waste Project to Waste Control Specialists (WCS) of Andrews, Texas under the Environmental Management (EM) Low-Level and Mixed

  18. Implementation Guide for DOE Fire Protection and Emergency Services Programs for Use with DOE O 420.1B, Facility Safety

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-09-27

    This Guide facilitates the implementation of requirements of DOE O 420.1B by providing an acceptable approach to meet the requirements for Fire Protection Programs. Cancels DOE G 440.1-5.

  19. Development of a process for releasing non-real property under order DOE 5400.5.

    SciTech Connect (OSTI)

    Warren, S.; Ranek, N. L.; Hensley, J.; Environmental Assessment; DOE

    1998-01-01

    It is the policy of the U.S. Department of Energy (DOE) to improve environmental quality and conserve natural and economic resources by, among other things, increasing the reuse and recycle of recoverable materials in order to minimize land disposal of wastes. Consistent with this policy, DOE's Office of Environmental Management believes it is important to pursue strategies for reusing and recycling the large and growing DOE inventory of recoverable non-real property. However, responsible pursuit of such strategies requires careful prior consideration of the available alternatives, given the radiological character of much of the non-real property to be released. Requirements applicable to considerations of this type are established by Order DOE 5400.5, Radiation Protection of the Public and the Environment. This article describes the development and content of a step-by-step process designed to provide confidence that radiological doses to the public from recycle or reuse of released non-real property containing residual radioactive material meet applicable regulatory standards, are as low as reasonably achievable, and meet the requirements in Order DOE 5400.5 for release of such material. The full process, described in the Draft Handbook for Controlling Release for Reuse or Recycle of Non-Real Property Containing Residual Radioactive Material (for interim use and comment), DOE-HDBK-xxxx-97 (June 1997), is available for viewing and downloading at http://www.em.doe.gov/recyc.

  20. DOE Issues Two Notices Seeking Comment on the Implementation of Its

    Energy Savers [EERE]

    Certification and Enforcement Rules | Department of Energy Two Notices Seeking Comment on the Implementation of Its Certification and Enforcement Rules DOE Issues Two Notices Seeking Comment on the Implementation of Its Certification and Enforcement Rules April 21, 2011 - 5:08pm Addthis Last week, the Department of Energy issued two Notices related to the application of its certification and enforcement regulations. First, the Department issued a Request for Information seeking information

  1. DOE to Provide up to $2.5 Million to Implement Solar Energy Technologies in

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Utah Image layout spacer Printer-friendly icon Printer-Friendly June 20, 2007 DOE to Provide up to $2.5 Million to Implement Solar Energy Technologies in Utah Salt Lake City, Utah, named 2007 Solar America City NEW YORK, NY � U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced that DOE will make available nearly $2.5 million to thirteen cities to increase the use of solar power across the country, building on the President�s commitment to further the development

  2. DOE Prepared for Implementation of Fixed-Price Hanford 222-S Laboratory

    Office of Environmental Management (EM)

    Analysis and Testing Services | Department of Energy Fixed-Price Hanford 222-S Laboratory Analysis and Testing Services DOE Prepared for Implementation of Fixed-Price Hanford 222-S Laboratory Analysis and Testing Services September 23, 2015 - 6:30pm Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati - The U.S. Department of Energy (DOE) awarded a contract on May 28, 2015 to Wastren Advantage, Inc. of Piketon, Ohio, for the purpose of providing

  3. DOE Order 458.1 Property Clearance Requirements and Factors Considered to

    Office of Environmental Management (EM)

    Update Its Clearance Limits | Department of Energy 58.1 Property Clearance Requirements and Factors Considered to Update Its Clearance Limits DOE Order 458.1 Property Clearance Requirements and Factors Considered to Update Its Clearance Limits Carlos Corredor, U.S. Department of Energy ;Gustavo Vasquez*, U.S. Department of Energy; Derek Favret, U.S. Department of Energy Abstract: This presentation will provide an explanation of the property clearance requirements contained in DOE O 458.1,

  4. Order Module--DOE O 420.1B, FACILITY SAFETY | Department of Energy

    Energy Savers [EERE]

    1B, FACILITY SAFETY Order Module--DOE O 420.1B, FACILITY SAFETY To ensure that new DOE hazard category 1, 2, and 3 nuclear facilities are designed and constructed in a manner that ensures adequate protection to the public, workers, and the environment from nuclear hazards. To ensure that major modifications to hazard category 1, 2, and 3 nuclear facilities comply with the design and construction requirements for new hazard category 1, 2, and 3 nuclear facilities. To ensure that new DOE nuclear

  5. DOE-STD-1034-93; Guide to Good Practices for Timely Orders to Operators

    Office of Environmental Management (EM)

    4-93 March 1993 CHANGE NOTICE NO. 1 December 1998 DOE STANDARD GUIDE TO GOOD PRACTICES FOR TIMELY ORDERS TO OPERATORS U.S. Department of Energy AREA MISC Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy, (800) 473-4375, fax: (301) 903-9823. Available to the public from

  6. Idaho CERCLA Disposal Facility Complex Compliance Demonstration for DOE Order 435.1

    SciTech Connect (OSTI)

    Simonds, J.

    2007-11-06

    This compliance demonstration document provides an analysis of the Idaho CERCLA Disposal Facility (ICDF) Complex compliance with DOE Order 435.1. The ICDF Complex includes the disposal facility (landfill), evaporation pond, administration facility, weigh scale, and various staging/storage areas. These facilities were designed and constructed to be compliant with DOE Order 435.1, Resource Conservation and Recovery act Subtitle C, and Toxic Substances Control Act polychlorinated biphenyl design and construction standards. The ICDF Complex is designated as the Idaho National Laboratory (INL) facility for the receipt, staging/storage, treatment, and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) waste streams.

  7. Order Module--DOE O 430.1B, REAL PROPERTY ASSET MANAGEMENT | Department of

    Energy Savers [EERE]

    Energy 0.1B, REAL PROPERTY ASSET MANAGEMENT Order Module--DOE O 430.1B, REAL PROPERTY ASSET MANAGEMENT "The objective of DOE O 430.1B, Real Property Asset Management, is to establish a corporate, holistic, and performance-based approach to real property life-cycle asset management that links real property asset planning, programming, budgeting, and evaluation to program mission projections and performance outcomes. To accomplish the objective, this Order identifies requirements and

  8. DOE Orders AeroSys to Halt Distribution of Inefficient Air Conditioner and

    Office of Environmental Management (EM)

    Heat Pump Models | Department of Energy Orders AeroSys to Halt Distribution of Inefficient Air Conditioner and Heat Pump Models DOE Orders AeroSys to Halt Distribution of Inefficient Air Conditioner and Heat Pump Models March 30, 2010 - 10:05am Addthis Today, the Department of Energy announced that it is requiring AeroSys, Inc. to stop distributing two product models - one air conditioner and one heat pump - that DOE testing found to consume more energy than allowed under federal efficiency

  9. EVMS Training Snippet: 1.1 DOE Order 413.3B EVM Requirements | Department

    Office of Environmental Management (EM)

    of Energy 1 DOE Order 413.3B EVM Requirements EVMS Training Snippet: 1.1 DOE Order 413.3B EVM Requirements This EVMS Training Snippet, sponsored by the Office of Project Management (PM), covers the Department of Energy's policy relative to Earned Value Management. Link to Video Presentation | Prior Snippet | Next Snippet (1.2) | Return to Index PDF icon Slides Only PDF icon Slides with Notes More Documents & Publications EVMS Training Snippet: 1.3 EVMS Stage 1 Surveillance EVMS Training

  10. Implementation Guide for Use with DOE O 460.1A, Packaging and Transportation Safety

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-06-05

    This Guide provides information concerning the use of current principles and practices, including regulatory guidance from the U. S. Department of Transportation and the U. S. Nuclear Regulatory Commission, where available, to establish and implement effective packaging and transportation safety programs. Does not cancel/supersede other directives.

  11. DOE Order 435.1 Performance Assessment Savannah River Site | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Order 435.1 Performance Assessment Savannah River Site DOE Order 435.1 Performance Assessment Savannah River Site Performance Assessments (PA) are analyses conducted for low level radioactive waste disposal facilities (or appropriate CERCLA documentation for a low level radioactive waste disposal facility), and are critical in determining the nature and extent of the controls that need to be put in place at the facility being evaluated. There are specific requirements for the

  12. Notice of Intent to Revise DOE Order 470.3B, Graded Security Protection (GSP) Policy

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    Request approval to revise the subject Order to make significant changes which are required for the Order to be consistent with threat information received from the intelligence community. Information provided by the joint DOE/IN and Defense Intelligence Agency, Nuclear Security Threat Capabilities Assessment, revealed the need to adjust adversary numbers and capabilities to reflect the intent of the policy and the inherent risk management considerations.

  13. Notice of Intent to Revise DOE Order 470.3B, Graded Security Protection (GSP) Policy

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-11-23

    Request approval to revise the subject Order to make significant changes which are required for the Order to be consistent with threat information received from the intelligence community. Information provided by the joint DOE/IN and Defense Intelligence Agency, Nuclear Security Threat Capabilities Assessment, revealed the need to adjust adversary numbers and capabilities to reflect the intent of the policy and the inherent risk management considerations.

  14. DOE Awards Task Order for Disposal of Los Alamos National Laboratory Waste

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today awarded a task order in support of the Los Alamos National Laboratory Legacy Waste Project to Waste Control Specialists (WCS) of Andrews, Texas under the Environmental Management (EM) Low-Level and Mixed Low-Level Waste Disposal Indefinite Delivery/Indefinite Quantity (ID/IQ) Master Contract.

  15. DOE Awards Task Order for Disposal of Los Alamos National Lab Waste

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) today awarded a task order in support of the Los Alamos National Laboratory Legacy Waste Project to Waste Control Specialists (WCS) of Andrews, Texas under the Environmental Management (EM) Low-Level and Mixed Low-Level Waste Disposal Indefinite Delivery/Indefinite Quantity (ID/IQ) Master Contract.

  16. DOE ORDER 5480.14, PHASE I - INSTALLATION ASSESSMENT FOR THE BETTIS ATOMIC POWER LABORATORY

    Office of Legacy Management (LM)

    DOE ORDER 5480.14, PHASE I - INSTALLATION ASSESSMENT FOR THE BETTIS ATOMIC POWER LABORATORY Prepared for the U.S. Department of Energy by Westinghouse Electric Corporation West Mifflin, Pennsylvania 15122-0079 i' Vendor Contract Number: DE-ACll-76PN00014 : IAELE OF CONTENTS I. Executive Summary ............................................. 2. Introduction .................................................. a. Background......;.........................................i b. Authority

  17. Clearance of Real and Personal Property Under New DOE Radiation Protection Directive -- DOE ORDER 458.1 Radiation Protection of the Public and the Environment

    Office of Environmental Management (EM)

    Clearance of Real and Personal Property Under DOE Radiation Protection Directive -- DOE Order 458.1 Radiation Protection of the Public and the Environment Gustavo Vázquez, HS-22 U.S. Department of Energy ERAD Webinar September 12, 2012 Release & Clearance of Property Under DOE Order 458.1 * Presentation objectives: -summarize DOE O 458.1 property release & clearance requirements -identify any changes from DOE 5400.5 -answer questions 2 Release & Clearance of Property Elements of DOE

  18. DOE Order Self Study Modules - DOE O 450.2 and P 450.4A: Integrated...

    Office of Environmental Management (EM)

    50.2 INTEGRATED SAFETY MANAGEMENT DOE P 450.4A INTEGRATED SAFETY MANAGEMENT POLICY DOE O 450.2 and DOE P 450.4A Familiar Level September 2011 1 DOE O 450.2 INTEGRATED SAFETY ...

  19. Order Module--DOE O 425.1D, VERIFICATION OF READINESS TO START UP OR

    Energy Savers [EERE]

    RESTART NUCLEAR FACILITIES | Department of Energy 5.1D, VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES Order Module--DOE O 425.1D, VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES "The familiar level of this module is divided into three sections. In the first section we will discuss the purpose of DOE O 425.1D and the requirements for 1) determining the level of readiness review (RR), 2) determining the startup authorization authority (SAA), and

  20. Order Module--DOE-STD-3009-94, PREPARATION GUIDE FOR U.S. DEPARTMENT OF

    Energy Savers [EERE]

    ENERGY NONREACTOR NUCLEAR FACILITY | Department of Energy STD-3009-94, PREPARATION GUIDE FOR U.S. DEPARTMENT OF ENERGY NONREACTOR NUCLEAR FACILITY Order Module--DOE-STD-3009-94, PREPARATION GUIDE FOR U.S. DEPARTMENT OF ENERGY NONREACTOR NUCLEAR FACILITY "The familiar level of this module is divided into three sections. The first section is an introduction to DOE-STD-3009-94. In the second section, we will introduce the 17 chapters of a documented safety analysis (DSA). The third section

  1. DOE Orders AeroSys to Halt Distribution of Inefficient Air Conditioner and

    Energy Savers [EERE]

    Heat Pump Models Shown to Violate Minimum Efficiency Standards | Department of Energy AeroSys to Halt Distribution of Inefficient Air Conditioner and Heat Pump Models Shown to Violate Minimum Efficiency Standards DOE Orders AeroSys to Halt Distribution of Inefficient Air Conditioner and Heat Pump Models Shown to Violate Minimum Efficiency Standards March 30, 2010 - 12:00am Addthis WASHINGTON, DC - Today, the Department of Energy announced that it is requiring AeroSys, Inc. to stop

  2. Enforcement Action - EA-2003-05 - Consent Order Between US DOE and Flour Fernald

    Office of Environmental Management (EM)

    18, 2003 Mr. Woodrow Jameson [ ] Fluor Fernald, Inc. P.O. Box 538704 Cincinnati, OH 45252-8704 EA-2003-05 Subject: Consent Order Incorporating Agreement between U.S. Department of Energy and Fluor Fernald, Inc. Dear Mr. Jameson: This letter refers to the Department of Energy's (DOE) evaluation of a recent investigation conducted by Fluor Fernald, Inc. (Fluor Fernald) into the facts and circumstances surrounding an unposted High Radiation Area adjacent to the small concrete building [ ] currently

  3. DOE Awards Task Order for Disposal of Los Alamos National Laboratory Waste

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today awarded a task order in support of the Los Alamos National Laboratory Legacy Waste Project to Waste Control Specialists (WCS) of Andrews, Texas under the Environmental Management (EM) Low-Level and Mixed Low-Level Waste Disposal Indefinite Delivery/Indefinite Quantity (ID/IQ) Master Contract. The award is a firm, fixed-price task order, based on pre-established rates with a $1.29 million value and has a one-year performance period.

  4. DOE-STD-1027-92; Hazard Categorization and Accident Analysis Techniques For Compliance With DOE Order 5480.23, Nuclear Safety Analysis Reports

    Office of Environmental Management (EM)

    7-92 December 1992 CHANGE NOTICE NO.1 September 1997 DOE STANDARD HAZARD CATEGORIZATION AND ACCIDENT ANALYSIS TECHNIQUES FOR COMPLIANCE WITH DOE ORDER 5480.23, NUCLEAR SAFETY ANALYSIS REPORTS U.S. Department of Energy AREA SAFT Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical Information,

  5. DOE Offers Technical Assistance on EPA Rules Implementation to States and the Utility Industry

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) is offering technical assistance to state public utility commissioners, generation owner/operators, and utilities on implementing the new and pending EPA air rules affecting the electric utility industry. Examples of typical assistance include technical information on cost and performance of the various power plant pollution retrofit control technologies; technical information on generation, demand-side or transmission alternatives for any replacement power needed for retiring generating units; and assistance to public utility commissions regarding any regulatory evaluations or approvals they may have to make on utility compliance strategies.

  6. DOE/SC-ARM-15-087 Ordering ARM Data Continuous Improvement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 Ordering ARM Data Continuous Improvement While every effort is made to ensure the quality and accuracy of the data, the occasional problem does arise. If quality issues are discovered while using ARM data, please contact the Data Quality Office at armdataquality@arm.gov or see dq.arm.gov for online reporting options. Be sure to include the datastream names and a description of the problem or error received. One-Stop Shopping: Getting the Data You Need From the ARM Data Archive,

  7. Idaho CERCLA Disposal Facility Complex Compliance Demonstration for DOE Order 435.1

    SciTech Connect (OSTI)

    J. Simonds

    2006-09-01

    This compliance demonstration document provides an analysis of the Idaho CERCLA Disposal Facility (ICDF) Complex compliance with DOE Order 435.1. The ICDF Complex includes the disposal facility (landfill), evaporation pond, admin facility, weigh scale, decon building, treatment systems, and various staging/storage areas. These facilities were designed and are being constructed to be compliant with DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, and Toxic Substances Control Act polychlorinated biphenyl design and construction standards. The ICDF Complex is designated as the central Idaho National Laboratory (INL) facilityyy for the receipt, staging/storage, treatment, and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) waste streams. This compliance demonstration document discusses the conceptual site model for the ICDF Complex area. Within this conceptual site model, the selection of the area for the ICDF Complex is discussed. Also, the subsurface stratigraphy in the ICDF Complex area is discussed along with the existing contamination beneath the ICDF Complex area. The designs for the various ICDF Complex facilities are also included in this compliance demonstration document. These design discussions are a summary of the design as presented in the Remedial Design/Construction Work Plans for the ICDF landfill and evaporation pond and the Staging, Storage, Sizing, and Treatment Facility. Each of the major facilities or systems is described including the design criteria.

  8. Implementation Plan for the Hawaii Geothermal Project Environmental Impact Statement (DOE Review Draft:)

    SciTech Connect (OSTI)

    1992-09-18

    The US Department of Energy (DOE) is preparing an Environmental Impact Statement (EIS) that identifies and evaluates the environmental impacts associated with the proposed Hawaii Geothermal Project (HGP), as defined by the State of Hawaii in its 1990 proposal to Congress (DBED 1990). The location of the proposed project is shown in Figure 1.1. The EIS is being prepared pursuant to the requirements of the National Environmental Policy Act of 1969 (NEPA), as implemented by the President's Council on Environmental Quality (CEQ) regulations (40 CFR Parts 1500-1508) and the DOE NEPA Implementing Procedures (10 CFR 1021), effective May 26, 1992. The State's proposal for the four-phase HGP consists of (1) exploration and testing of the geothermal resource beneath the slopes of the active Kilauea volcano on the Island of Hawaii (Big Island), (2) demonstration of deep-water power cable technology in the Alenuihaha Channel between the Big Island and Mau, (3) verification and characterization of the geothermal resource on the Big Island, and (4) construction and operation of commercial geothermal power production facilities on the Big Island, with overland and submarine transmission of electricity from the Big Island to Oahu and possibly other islands. DOE prepared appropriate NEPA documentation for separate federal actions related to Phase 1 and 2 research projects, which have been completed. This EIS will consider Phases 3 and 4, as well as reasonable alternatives to the HGP. Such alternatives include biomass coal, solar photovoltaic, wind energy, and construction and operation of commercial geothermal power production facilities on the Island of Hawaii (for exclusive use on the Big Island). In addition, the EIs will consider the reasonable alternatives among submarine cable technologies, geothermal extraction, production, and power generating technologies; pollution control technologies; overland and submarine power transmission routes; sites reasonably suited to support project facilities in a safe and environmentally acceptable manner; and non-power generating alternatives, such as conservation and demand-side management.

  9. DOE Order Self Study Modules - DOE O 425.1D, Verification of Readiness to Startup or Restart Nuclear Facilities

    Office of Environmental Management (EM)

    25.1D VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES DOE O 425.1D Familiar Level June 2011 1 DOE O 425.1D VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES FAMILIAR LEVEL _________________________________________________________________________ OBJECTIVES Given the familiar level of this module and the resources, you will be able to perform the following: 1. What is the purpose of DOE O 425.1D, Verification of Readiness to Startup or Restart Nuclear

  10. DOE Order Self Study Modules - DOE G 450.4-1B Integrated Safety Management Systems Guide

    Office of Environmental Management (EM)

    G 450.4-1B INTEGRATED SAFETY MANAGEMENT SYSTEM GUIDE ALBUQUERQUE OPERATIONS OFFICE Change No: 0 DOE G 450.4-1B Level: Familiar Date: 6/15/01 1 DOE G 450.4-1B INTEGRATED SAFETY MANAGEMENT SYSTEM (ISMS) GUIDE FAMILIAR LEVEL _________________________________________________________________________ OBJECTIVES Given the familiar level of this module and the resources listed below, you will be able to: 1. State the purpose of DOE G 450.4, ISMS Guide. 2. State the objectives of DOE G 450.4, ISMS Guide.

  11. Order Module--DOE-STD-3009-94, PREPARATION GUIDE FOR U.S. DEPARTMENT...

    Energy Savers [EERE]

    Department of Energy Nonreactor Nuclear Facilities Documented Safety Analyses More Documents & Publications DOE-STD-3009-94 DOE-STD-3009-94 DOE-STD-3009-2014 Requirements Matrix...

  12. ACTION MEMO: Technical Position on the Use of National Consensus and Building Codes to Meet DOE Order 420. I B.

    Broader source: Energy.gov [DOE]

    The attached technical position on the Use of National Consensus and Building Codes to meet Department of Energy (DOE) Order 420.1b Facility Safety, clarifies the use of national consensus and...

  13. DOE-HDBK-1205-97; Guide to Good Practices for the Design, Development, and Implementation of Examinations

    Office of Environmental Management (EM)

    5-97 June 1997 Supersedes DOE-STD-1011-92 DOE HANDBOOK GUIDE TO GOOD PRACTICES FOR THE DESIGN, DEVELOPMENT, AND IMPLEMENTATION OF EXAMINATIONS U.S. Department of Energy FSC 6910 Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831; (423) 576-8401.

  14. DOE-HDBK-7502-95; Implementing U.S. Department of Energy Lessons Learned Programs - Volume 1

    Office of Environmental Management (EM)

    DOE-HDBK-7502-95 August 1995 DOE HANDBOOK IMPLEMENTING U.S. DEPARTMENT OF ENERGY LESSONS LEARNED PROGRAMS Volume I U.S. Department of Energy FSC 6910 Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831; (615) 576-8401. Available to the public

  15. Implementation of Department of Energy Oversight Policy

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-09-15

    This Order provides direction for implementing Department of Energy (DOE) P 226.1, Department of Energy Oversight Policy, dated 6-10-05, which establishes DOE policy for assurance systems and processes established by DOE contractors and oversight programs performed by DOE line management and independent oversight organizations. Cancels DOE P 450.5. Canceled by DOE O 226.1A.

  16. DOE Order Self Study Modules - DOE O 460.1C Packaging and Transportation Safety and DOE O 460.2A Departmental Materials Transportation and Packaging Management

    Office of Environmental Management (EM)

    60.1C PACKAGING AND TRANSPORTATION SAFETY DOE O 460.2A DEPARTMENTAL MATERIALS TRANSPORTATION AND PACKAGING MANAGEMENT DOE O 460.1C and 460.2A Familiar Level June 2011 1 DOE O 460.1C PACKAGING AND TRANSPORTATION SAFETY DOE O 460.2A DEPARTMENTAL MATERIALS TRANSPORTATION AND PACKAGING MANAGEMENT FAMILIAR LEVEL _________________________________________________________________________ OBJECTIVES Given the familiar level of this module and the resources, you will be able to perform the following: 1.

  17. Notice of Intent to Revise DOE Order 522.1, Pricing of Departmental Materials and Services

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-11-05

    The purpose is to provide administrative updates and implement a Secretarial decision to revise user facility pricing.

  18. Notice of Intent to Issue DOE N 314.1, DOE-Flex: DOE's Telework Program while Developing a Successor Order (5-6-11)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-05-06

    This is to develop DOE N 3XX, which will establish the requirements and responsibilities for the Department's telework/flexiplace program.

  19. ORISE: The Value of Independence, a white paper on DOE Order...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    verification process at almost any stage of a cleanup project. DOE has incorporated the language requiring the independent verification of nuclear cleanup activities as an added...

  20. Designation Order 00-01.00A to Susan F. Beard - DOE Directives...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Susan F. Beard is hereby designated the Department of Energy's (DOE) Designated Agency Ethics Official, as that title and its responsibilities are described in 5 CFR Part 2638,...

  1. 57 Fed Reg 15122: DOE NEPA Implementing Procedures-Final Rule

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) is revising the existing rule at 10 CFR part 1021, titled "Compliance with the National Environmental Policy Act," to incorporate revised provisions of DOE's...

  2. Implementation Guide for Use with DOE O 450.1, Environmental Protection Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-02-18

    This Guide provides background information, an overview of the integration process, and guidance relating to the preliminary steps that DOE sites should undertake to meet the requirements of DOE O 450.1.

  3. Accelerator Facility Safety Implementation Guide for DOE O 420.2C, Safety of Accelerator Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-08-01

    This document is a guide to understanding and meeting the requirements of DOE O 420.2C, and shares lessons learned based on valuable experience within the community. Supersedes DOE G 420.2-1.

  4. Final Report Implementing Office of Management and Budget Information Dissemination Quality Guidelines (DOE, 2002)

    Broader source: Energy.gov [DOE]

    This DOE guidelines sets forth policy and procedures to ensure and maximize the quality, utility, objectivity, and integrity of the information that DOE disseminates to members of the public. DOE has prepared this final report pursuant to OMB government-wide guidelines under section 515 of the Treasury and General Government Appropriations Act for Fiscal Year 2001.

  5. Policy Flash 2014-30 DOE Order 412.1a, Work Authorization System...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    concerning this policy flash should be directed to Mike Dombrowski, of the Office of Acquisition and Project Management Policy at 202-287-1828 or at michael.dombrowski@hq.doe....

  6. Notice of Intent to Revise DOE Order 470.3B, Graded Security...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    adversary numbers and capabilities to reflect the intent of the policy and the inherent risk management considerations. 15 NOV 23 - DOE O 470.3B Graded Security Protection (GSP)...

  7. IMPLEMENTATION OF THE SEISMIC DESIGN CRITERIA OF DOE-STD-1189-2008 APPENDIX A [FULL PAPER

    SciTech Connect (OSTI)

    OMBERG SK

    2008-05-14

    This paper describes the approach taken by two Fluor Hanford projects for implementing of the seismic design criteria from DOE-STD-1189-2008, Appendix A. The existing seismic design criteria and the new seismic design criteria is described, and an assessment of the primary differences provided. The gaps within the new system of seismic design criteria, which necessitate conduct of portions of work to the existing technical standards pending availability of applicable industry standards, is discussed. Two Hanford Site projects currently in the Control Decision (CD)-1 phase of design have developed an approach to implementation of the new criteria. Calculations have been performed to determine the seismic design category for one project, based on information available in early CD-1. The potential effects of DOE-STD-1189-2008, Appendix A seismic design criteria on the process of project alternatives analysis is discussed. Present of this work is expected to benefit others in the DOE Complex that may be implementing DOE-STD-1189-2008.

  8. Listing of DOE/FE Authorizations/Orders Issued in 2015

    Broader source: Energy.gov [DOE]

    The following chart contains all Orders issued by the Office of Natural Gas Regulatory Activities in 2015 thru December 31st. The orders include all new or renewed authority to Import and Export...

  9. Listing of DOE/FE Authorizations/Orders Issued in 2016

    Broader source: Energy.gov [DOE]

    The following chart contains all Orders issued by the Office of Natural Gas Regulatory Activities in 2016 thru March 23rd. The orders include all new or renewed authority to Import and Export...

  10. Guidance document for revision of DOE Order 5820.2A, Radioactive Waste Technical Support Program. Revision 1

    SciTech Connect (OSTI)

    Kudera, D.E.; McMurtrey, C.D.; Meagher, B.G.

    1993-04-01

    This document provides guidance for the revision of DOE Order 5820.2A, ``Radioactive Waste Management.`` Technical Working Groups have been established and are responsible for writing the revised order. The Technical Working Groups will use this document as a reference for polices and procedures that have been established for the revision process. The overall intent of this guidance is to outline how the order will be revised and how the revision process will be managed. In addition, this document outlines technical issues considered for inclusion by a Department of Energy Steering Committee.

  11. DOE-ER-STD-6001-92; Implementation Guide for Quality Assurance Programs for Basic and applied Research

    Office of Environmental Management (EM)

    D9E-ER-STD--6001 -92 DE92 016352 DOE STANDARD IMPLEMENTATION GUIDE FOR QUALITY ASSURANCE PROGRAMS FOR BASIC AND APPLIED RESEARCH U.S. Department of Energy Washington, D.C. 20585 AREA-QCIC -~ This report has been reproduced directly from the best available copy. Available to the public from the National Technical Information Service, U.S. Department of Commerce, 5285 Port Royal Rd., Springfield, VA 22161. DOE-ER-STD-6001-92 ACKNOWLEDGEMENT The Office of Energy Research (ER) wishes to acknowledge

  12. Continuity of Operations (COOP) Implementation Plan | U.S. DOE Office of

    Office of Science (SC) Website

    Science (SC) Continuity of Operations (COOP) Implementation Plan Safety and Security Policy (SSP) SSP Home About Frequently Used Resources NEPA Documents Continuity of Operations (COOP) Implementation Plan Contact Information Safety and Security Policy U.S. Department of Energy SC-31/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-6800 F: (301) 903-7047 More Information » Continuity of Operations (COOP) Implementation Plan Print Text Size: A A A

  13. Guidance on meeting DOE order requirements for traceable nondestructive assay measurements

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    Purpose of this guide is to facilitate accuracy and precision of nondestructive assay measurements through improvement of the materials and process of traceability. This document provides DOE and its contractor facilities with guidance to establish traceability to the national measurement base for site-prepared NDA working reference materials.

  14. Defects Lead to Order | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Defects Lead to Order Basic Energy Sciences (BES) BES Home About Research Facilities Science Highlights Benefits of BES Funding Opportunities Basic Energy Sciences Advisory Committee (BESAC) Community Resources Contact Information Basic Energy Sciences U.S. Department of Energy SC-22/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-3081 F: (301) 903-6594 E: Email Us More Information » 12.14.15 Defects Lead to Order Surprising order found in bundles of protein

  15. Listing of DOE/FE Authorizations/Orders Issued in 2016 | Department...

    Office of Environmental Management (EM)

    AUTHORIZATION HOLDER DESCRIPTION OF ACTION 3767 15-171-LNG 1132016 Sabine Pass Liquefaction, LLC Order 3767 Granting Blanket Authorization to Export Liquefied Natural Gas by...

  16. DOE Prepared for Implementation of Fixed-Price Hanford 222-S...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The primarily firm-fixed-price nature of the contract will allow DOE to shift cost risk from the Government to the Contractor during execution of the contract requirements. ...

  17. DOE Solicits Views on the Implementation of Large-Capacity Clothes...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    from DOE's test procedure for clothes washer models with clothes container capacities in excess of 3.8 cubic feet. In 2006, the Department first granted an interim waiver to...

  18. Implementation Guide for Use with DOE O 460.2 Departmental Materials Transportation and Packaging Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-11-15

    The purpose of this guide is to assist those responsible for transporting and packaging Department materials, and to provide an understanding of Department policies on activities which supplement regulatory requirements. Does not cancel/supersede other directives.

  19. Proposed Risk-Informed Seismic Hazard Periodic Reevaluation Methodology for Complying with DOE Order 420.1C

    SciTech Connect (OSTI)

    Kammerer, Annie

    2015-10-01

    Department of Energy (DOE) nuclear facilities must comply with DOE Order 420.1C Facility Safety, which requires that all such facilities review their natural phenomena hazards (NPH) assessments no less than every ten years. The Order points the reader to Standard DOE-STD-1020-2012. In addition to providing a discussion of the applicable evaluation criteria, the Standard references other documents, including ANSI/ANS-2.29-2008 and NUREG-2117. These documents provide supporting criteria and approaches for evaluating the need to update an existing probabilistic seismic hazard analysis (PSHA). All of the documents are consistent at a high level regarding the general conceptual criteria that should be considered. However, none of the documents provides step-by-step detailed guidance on the required or recommended approach for evaluating the significance of new information and determining whether or not an existing PSHA should be updated. Further, all of the conceptual approaches and criteria given in these documents deal with changes that may have occurred in the knowledge base that might impact the inputs to the PSHA, the calculated hazard itself, or the technical basis for the hazard inputs. Given that the DOE Order is aimed at achieving and assuring the safety of nuclear facilities—which is a function not only of the level of the seismic hazard but also the capacity of the facility to withstand vibratory ground motions—the inclusion of risk information in the evaluation process would appear to be both prudent and in line with the objectives of the Order. The purpose of this white paper is to describe a risk-informed methodology for evaluating the need for an update of an existing PSHA consistent with the DOE Order. While the development of the proposed methodology was undertaken as a result of assessments for specific SDC-3 facilities at Idaho National Laboratory (INL), and it is expected that the application at INL will provide a demonstration of the methodology, there is potential for general applicability to other facilities across the DOE complex. As such, both a general methodology and a specific approach intended for INL are described in this document. The general methodology proposed in this white paper is referred to as the “seismic hazard periodic review methodology,” or SHPRM. It presents a graded approach for SDC-3, SDC-4 and SDC-5 facilities that can be applied in any risk-informed regulatory environment by once risk-objectives appropriate for the framework are developed. While the methodology was developed for seismic hazard considerations, it can also be directly applied to other types of natural hazards.

  20. DOE Order Program and Project Management for the Acquisition of Capital Assets

    Broader source: Energy.gov [DOE]

    The goal of this Guide is to provide the Department of Energy's federal project directors (FPDs) with the knowledge, methodologies and tools needed to meet Order 413.3A's requirement that they plan...

  1. DOE/SC-ARM-09-023 Ordering ARM Data One-Stop Shopping: Getting...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    When data are ordered, the Data Archive will process and deliver the selected data to an ftp site for downloading. To access data gathered during field campaigns (also known as...

  2. Order Module--DOE O 458.1, RADIATION PROTECTION OF THE PUBLIC AND THE ENVIRONMENT

    Broader source: Energy.gov [DOE]

    The familiar level of this module is divided into two sections. In the first section, we will discuss the objectives and definitions related to the Order. In the second section, we will discuss the...

  3. Microsoft Word - Comments on Alexandria Mirant Plant-DOE order to re-open-final.doc

    Office of Environmental Management (EM)

    P.O. Box 11138 Takoma Park, MD 20912 (301) 891-6726 info@chesapeakeclimate.org March 22, 2006 Mr. Lawrence Mansueti Permitting, Siting, and Analysis Division Office of Electricity Delivery and Energy Reliability Department of Energy 1000 Independence Avenue, SW Washington, DC 20585-0119 Re: Comments on Emergency Order to Resume Limited Operation at the Potomac River Generating Station, Alexandria, VA. Dear Mr. Mansueti, This letter is in response to the Department of Energy Emergency Order

  4. Technical Security Program - DOE Directives, Delegations, and...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    470.6, Technical Security Program by Sam Soley Functional areas: Security, Counterintelligence This order implements the Department of Energy (DOE) Technical Security Program...

  5. LLNS Beryllium Consent Order Fact Sheet

    Office of Environmental Management (EM)

    - LLNS Beryllium Consent Order SUMMARY OF CONSENT ORDER In November 2010, the U.S. Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) issued a consent order to Lawrence Livermore National Security, LLC (LLNS) for deficiencies related to LLNS's implementation of DOE's Chronic Beryllium Disease Prevention Program (CBDPP) regulation at Lawrence Livermore National Laboratory. The consent order requires LLNS to implement corrective actions that will ensure LLNS meets

  6. 10 CFR 1021: National Environmental Policy Act Implementing Procedures (DOE, 2011)

    Broader source: Energy.gov [DOE]

    The purpose of Part 10 CFR 1021 is to establish procedures that the Department of Energy (DOE) shall use to comply with section 102(2) of the National Environmental Policy Act (NEPA) of 1969 (42 U...

  7. Los Alamos National Laboratory DOE M441.1-1 implementation

    SciTech Connect (OSTI)

    Worl, Laura A; Veirs, D Kirk; Smith, Paul H; Yarbro, Tresa F; Stone, Timothy A

    2010-01-01

    Loss of containment of nuclear material stored in containers such as food-pack cans, paint cans, or taped slip lid cans has generated concern about packaging requirements for interim storage of nuclear materials in working facilities such as the plutonium facility at Los Alamos National Laboratory (LANL). The Department of Energy (DOE) issued DOE M 441.1-1, Nuclear Materials Packaging Manual on March 7, 2008 in response to the Defense Nuclear Facilities Safety Board Recommendation 2005-1. The Manual directs DOE facilities to follow detailed packaging requirements to protect workers from exposure to nuclear materials stored outside of approved engineered-contamination barriers. Los Alamos National Laboratory has identified the activities that will be performed to bring LANL into compliance with DOE M 441.1-1. These include design, qualification and procurement of new containers, repackaging based on a risk-ranking methodology, surveillance and maintenance of containers, and database requirements. The primary purpose is to replace the out-dated nuclear material storage containers with more robust containers that meet present day safety and quality standards. The repackaging campaign is supported by an integrated risk reduction methodology to prioritize the limited resources to the highest risk containers. This methodology is systematically revised and updated based on the collection of package integrity data. A set of seven nested packages with built-in filters have been designed. These range in size from 1 qt. to 10 gallon. Progress of the testing to meet Manual requirements will be given. Due to the number of packages at LANL, repackaging to achieve full compliance will take five to seven years.

  8. Best Practices for HPSB Guiding Principles Implementation in Existing DOE Buildings

    SciTech Connect (OSTI)

    Henderson, Jordan W.

    2014-05-06

    The intent of this paper is to document an approach to screening existing buildings at DOE sites for High-Performance and Sustainable Buildings (HPSB) Guiding Principles (GPs) potential, developing policies and programs to address a majority of the HPSB GPs, and how to prioritize buildings with the greatest potential. This paper will also include example strategies for HPSB inventory and projection schedules and best practices on approaching and interpreting select criteria that have been troublesome to sites.

  9. Implementation of an Integrated Information Management System for the US DOE Hanford Tank Farms Project

    SciTech Connect (OSTI)

    Joyner, William Scott; Knight, Mark A.

    2013-11-14

    In its role as the Tank Operations Contractor at the U.S. Department of Energy's site in Hanford, WA, Washington River Protection Solutions, LLC is implementing an integrated document control and configuration management system. This system will combine equipment data with technical document data that currently resides in separate disconnected databases. The new system will provide integrated information, enabling users to more readily identify the documents that relate to a structure, system, or component and vice-versa. Additionally, the new system will automate engineering work processes through electronic workflows, and where practical and feasible provide integration with design authoring tools. Implementation of this system will improve configuration management of the technical baseline, increase work process efficiencies, support the efficient design of future large projects, and provide a platform for the efficient future turnover of technical baseline data and information.

  10. Request to Cancel Department of Energy (DOE) Order, Use of Management and Operating or other Facility Management Contractor Employees for Services to DOE in the Washington D.C. Area, dated May 31, 2011

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    DOE is canceling this directive and its associated DOE-wide mandated requirements in recognition of Departmental management and oversight improvements of Headquarters sponsored assignments to the Washington D.C. area and opting to implement as program specific risk based management approach to these actions.

  11. Request to Cancel Department of Energy (DOE) Order 350.2B, Use of Management and Operating or other Facility Management Contractor Employees for Services to DOE in the Washington D.C. Area

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-11-23

    DOE is canceling this directive and its associated DOE-wide mandated requirements in recognition of Departmental management and oversight improvements of Headquarters sponsored assignments to the Washington D.C. area and opting to implement as program specific risk based management approach to these actions.

  12. New - DOE G 436.1-1, Federal Sustainable Print Management - DOE...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Patricia Greeson The Guide provides acceptable approaches for implementing the IT sustainability requirements and criteria required by DOE Order 436.1, Departmental...

  13. DOE-ER-STD-6001-92

    Broader source: Energy.gov [DOE]

    Implementation Guide for Quality Assurance Programs for Basic and Applied Research Canceled (January, 2003) This Implementation Guide is intended to assist management at DOE-ER sponsored facilities in the process of developing and implementing Quality Assurance Programs (QAPs) that satisfy the requirements of DOE Order 5700.6C.

  14. DRAFT - DOE O 313.1A, Management and Funding of the Department’s Overseas Presence

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    This Order delineates DOE, including NNSA, requirements and responsibilities governing DOE’s Overseas Presence in order to effectively meet national security objectives, including energy security, nuclear security, and scientific discovery and innovation, implemented outside the United States.

  15. Order Module--DOE O 460.1C, PACKAGING AND TRANSPORTATION SAFETY, DOE O 460.2A, DEPARTMENTAL MATERIALS TRANSPORTATION AND PACKAGING MANAGEMENT

    Broader source: Energy.gov [DOE]

    "The familiar level of this module is divided into two sections. The objectives and requirements of DOE O 460.1C and DOE O 460.2A will be discussed in the first and second sections, respectively....

  16. Status and Effectiveness of DOE Efforts to Learn from Internal and External Operating Experience in Accordance with Commitment #20 of the DOE Implementation Plan for Defense Nuclear Facilities Safety Board Recommendation 2004-1

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Safety and Security Report to the Secretary on the Status and Effectiveness of DOE Efforts to Learn from Internal and External Operating Experience in Accordance with Commitment #20 of the DOE Implementation Plan for Defense Nuclear Facilities Safety Board Recommendation 2004-1 February 2011 Office of Health, Safety and Security U.S. Department of Energy Office of Health, Safety and Security HSS Table of Contents 1.0 Introduction

  17. LLNS Beryllium Consent Order Fact Sheet | Department of Energy

    Office of Environmental Management (EM)

    LLNS Beryllium Consent Order Fact Sheet LLNS Beryllium Consent Order Fact Sheet In November 2010, the U.S. Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) issued a consent order to Lawrence Livermore National Security, LLC (LLNS) for deficiencies related to LLNS's implementation of DOE's Chronic Beryllium Disease Prevention Program (CBDPP) regulation at Lawrence Livermore National Laboratory. The consent order requires LLNS to implement corrective actions that

  18. DOE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy PLEASE KEEP THIS PAHPHLET WITH YOU DURING YOUR VISIT Welcome to the Hanford Site Visitor Orientation 2 We take safety, security, and environmental protection seriously The safety and health of our employ- ees, the public, and those who visit the Hanford Site, in addition to site security and protection of the envi- ronment, are fundamental values of the U.S. Department of Energy (DOE) and its contractors. We strive to achieve and sustain a worksite that is free of

  19. NEW - DOE O 452.2E, Nuclear Explosive Safety

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    This Department of Energy (DOE) Order establishes requirements to implement the nuclear explosive safety (NES) elements of DOE O 452.1D, Nuclear Explosive and Weapon Surety Program, or successor directive, for routine and planned nuclear explosive operations (NEOs).

  20. Ground Water Protection Programs Implementation Guide for Use with DOE O 450.1, Environmental Protection Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-05-05

    This Guide provides a description of the elements of an integrated site-wide ground water protection program that can be adapted to unique physical conditions and programmatic needs at each DOE site. Canceled by DOE N 251.82.

  1. DOE-HDBK-1216-2015

    Broader source: Energy.gov [DOE]

    Environmental Radiological Effluent Monitoring and Environmental Surveillance The Department of Energy’s (DOE) radiation protection of the public and the environment is contained within DOE Order (O) 458.1, Radiation Protection of the Public and the Environment. This Handbook describes elements that may be used to implement the radiological effluent monitoring and environmental surveillance requirements in DOE O 458.1.

  2. Teddico: Order (2012-SE-5409)

    Broader source: Energy.gov [DOE]

    DOE ordered The Electrical Design, Development and Implementation Company d/b/a Teddico to pay a $18,994 civil penalty after finding Teddico had manufactured and distributed in commerce in the U.S. 218 units of a variety of noncompliant metal halide lamp fixtures basic models.

  3. Ground Water Surveillance Monitoring Implementation Guide for Use with DOE O 450.1, Environmental Protection Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-06-24

    This Guide assists DOE sites in establishing and maintaining surveillance monitoring programs to detect future impacts on ground water resources from site operations, to track existing ground water contamination, and to assess the potential for exposing the general public to site releases. Canceled by DOE N 251.82.

  4. To request the approval of a new Staffing and Placing Order under DOE O 325.3

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-11-05

    To create a new Staffing and Placement order that will establish policies and other requirements relating to internal and external staffing and recruitment practices.

  5. Implementation Guide, Wildland Fire Management Program for Use with DOE O 450.1, Environmental Protection Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-02-11

    This Guide provides a full range of activities and functions to plan, prepare, and respond to potential fires and rehabilitate undeveloped lands following a fire. Canceled by DOE N 251.82.

  6. Approved: 6-29-2010, Conduct of Operations, DOE O 422.1

    Broader source: Energy.gov [DOE]

    1. PURPOSE. The objective of this Order is to define the requirements for establishing and implementing Conduct of Operations Programs at Department of Energy (DOE), including National Nuclear...

  7. DOE Order Self Study Modules - 29 CFR 1910.147, The Control Of Hazardous Energy (Lockout/Tagout)

    Office of Environmental Management (EM)

    9 CFR 1910.147 Familiar Level June 2011 1 June 2011 29 CFR 1910.147 THE CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) FAMILIAR LEVEL ___________________________________________________________________________ OBJECTIVES Given the familiar level of this module and the resources, you will be able to answer the following questions: 1. What is the purpose of implementing 29 CFR 1910.147? 2. What is the definition of the following terms?  authorized employee  hot tap  tagout  lockout 

  8. DOE and FERC Jointly Submit Implementation Proposal for The National Action Plan on Demand Response to Congress

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy and the Federal Energy Regulatory Commission (FERC) jointly submitted to Congress a required “Implementation Proposal for The National Action Plan on Demand Response.”

  9. Implementation of Department of Energy Oversight Policy

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-07-31

    This Order implements the policy that establishes a Department-wide oversight process to protect the public, workers, environment, and national security assets effectively through continuous improvement. Cancels DOE O 226.1. Canceled by DOE O 226.1B

  10. National Renewable Energy Laboratory Environmental Performance Report for 2007 (Annual Site Environmental Report per DOE Orders 231.1 and 5400.5)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Performance Report- 2007 Page i NATIONAL RENEWABLE ENERGY LABORATORY ENVIRONMENTAL PERFORMANCE REPORT for 2007 (Annual Site Environmental Report per DOE Orders 231.1 and 5400.5) Prepared by: Environment, Safety, Health & Quality Office National Renewable Energy Laboratory NREL is a national laboratory of the U.S. Department of Energy and is Operated by the Alliance for Sustainable Energy, LLC November 2008 NREL/MP-190-43663 Cover Photo contributed by NREL Employee Steve Wilcox,

  11. DOE-STD-1104 Requirements Crosswalk

    Office of Environmental Management (EM)

    09 to DOE-STD-1104-2014 Requirements Matrix - 1 - No. Section/ Page Number DOE-STD-1104-2009 Requirement DOE-STD-1104-2014 Requirements Comment Gen DOE-STD-1104-2009 was broadly implemented but not required. DOE-STD-1104-2014 will be required by DOE Order 420.1C, Page Change 1, soon to be approved (already concurred upon by the program offices and the Directives Review Board). DOE-STD-1104- 2014will now be a required method. For more discussion, see letter from Moniz to Winokur, October 18,

  12. Powering Your Community With Solar: Overcoming Market and Implementation Barriers (Fact Sheet), U.S. Department of Energy (DOE)

    Broader source: Energy.gov [DOE]

    This document introduces the Energy Department’s new Solarize Guidebook: A Community Guide to Collective Purchasing of Residential PV Systems. The guide is designed for “green” consumers, utilities, local governments, and community groups who want to replicate the success of the Solarize Portland model, overcome barriers to implementation, and permanently transform the market for solar energy in their communities.

  13. 1997 annual report on waste generation and waste minimization progress as required by DOE Order 5400.1, Hanford Site

    SciTech Connect (OSTI)

    Segall, P.

    1998-04-13

    Hanford`s missions are to safely clean up and manage the site`s legacy wastes, and to develop and deploy science and technology. Through these missions Hanford will contribute to economic diversification of the region. Hanford`s environmental management or cleanup mission is to protect the health and safety of the public, workers, and the environment; control hazardous materials; and utilize the assets (people, infra structure, site) for other missions. Hanford`s science and technology mission is to develop and deploy science and technology in the service of the nation including stewardship of the Hanford Site. Pollution Prevention is a key to the success of these missions by reducing the amount of waste to be managed and identifying/implementing cost effective waste reduction projects. Hanford`s original mission, the production of nuclear materials for the nation`s defense programs, lasted more than 40 years, and like most manufacturing operations, Hanford`s operations generated large quantities of waste and pollution. However, the by-products from Hanford operations pose unique problems like radiation hazards, vast volumes of contaminated water and soil, and many contaminated structures including reactors, chemical plants and evaporation ponds. The cleanup activity is an immense and challenging undertaking, which includes characterization and decommissioning of 149 single shell storage tanks, treating 28 double shell tanks, safely disposing of over 2,100 metric tons of spent nuclear fuel stored on site, removing numerous structures, and dealing with significant solid waste, ground water, and land restoration issues.

  14. Powering Your Community With Solar: Overcoming Market and Implementation Barriers (Fact Sheet), U.S. Department of Energy (DOE)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Your Community With Solar: Overcoming Market and Implementation Barriers Lessons from successful Solarize campaigns help communities seize volume discounts through collective purchasing The first Solarize program began in Portland, Oregon, as a grassroots campaign for collective SunShot will work to bring down the full cost of solar-including the costs of solar cells and installation by focusing on four main pillars: 1. Technologies for solar cells and arrays that convert sunlight to energy; 2.

  15. DRAFT DOE Training Curriculum

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Training Curriculum DOE-100DE Federal Staff Orientation Training DOE-120 DOE Oversight and Implementation DOE-140 Developing Integrated Oversight Plans (Managers/Supervisors) PHY-128DE Basic Survey Overview PHY-130 Basic Survey VAP-335 Fundamentals of Performance Testing DOE-200DE Assessment Fundamentals DOE-210 Assessment Preparation DOE-220 Assessment Techniques DOE-130 Performance Management Fundamentals DOE-310 Oversight Data Analysis & Reporting DOE-320 Causal Analysis &

  16. DOE O 205.1B Reference List | Department of Energy

    Office of Environmental Management (EM)

    DOE O 205.1B Reference List Includes a list of sources cited in the directive and additional information sources to assist in implementing DOE Order 205.1B, Cyber Security Program. ...

  17. Guidelines for Implementing Executive Order 11988, "Floodplain Management," and Executive Order 13690, "Establishing a Federal Flood Risk Management Standard and a Process for Further Soliciting and Considering Stakeholder Input"

    Broader source: Energy.gov [DOE]

    The Water Resources Council approved revised implementing guidelines for E.O. 11988 (as amended) (2015) and E.O. 13690 (2015) in October 2015. The revised implementing guidelines explain the use of...

  18. National Renewable Energy Laboratory Environmental Performance Report for 2008 (Annual Site Environmental Report per DOE Orders 231.1 and 5400.5)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 (Annual Site Environmental Report per DOE Orders 231.1 and 5400.5) Prepared by: Environment, Health, and Safety Office National Renewable Energy Laboratory NREL is a national laboratory of the U.S. Department of Energy and is Operated by the Alliance for Sustainable Energy, LLC September 2009 Cover photo contributed by Bob Fiehweg, 2008 - View of Eldorado Canyon from the National Wind Technology Center. NOTICE This report was prepared as an account of work sponsored by an agency of the United

  19. Quality Assurance Management System Guide for Use with 10 CFR 830.120 and DOE O 414.1

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-06-17

    DOE Elements and DOE contractors should consult this Guide in order to develop and implement effective management systems that are consistent with the Department's quality expectations and that support the Safety Management System Policy, DOE P 450.4. Canceled by DOE G 414.1-2A. Does not cancel other directives.

  20. Extension of DOE N 470.5

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-09-28

    DOE N 470.5, Implementation of Section 1072 of the National Defense Authorization Act for Fiscal Year 2008, dated 8-12-09 is extended until 9-28-11. Requirements in the Notice will be integrated into a new DOE Order, Personnel Security, which is currently under development.

  1. DRAFT - DOE G 580.1-1A, Personal Property

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    This Guide provides non-regulatory guidance and information to assist DOE organizations and contractors in implementing the DOE-wide and site-specific personal property management programs. It supplements the policy, requirements, and responsibilities information contained in the DOE Order cited above and clarifies the regulatory requirements contained in the Federal Property Management Regulation (FMR) and specific contracts.

  2. Implementation of the Clean Air Act, Title III, Section 112(r) Prevention of Accidental Release Rule requirements at U.S. DOE Oak Ridge Reservation facilities

    SciTech Connect (OSTI)

    Humphreys, M.P. [Dept. of Energy Oak Ridge Operations Office, TN (United States). Environmental Protection Div.; Fellers, H.L. [Lockheed-Martin Energy Systems K-25 Site, Oak Ridge, TN (United States)

    1997-12-31

    Title III, Section 112(r) of the Clean Air Act (CAA) Amendments of 1990 requires the Environmental Protection Agency (EPA) to promulgate regulations to prevent accidental releases of regulated substances and to reduce the severity of those releases that do occur. The final EPA rule for Risk Management Programs under Section 112(r)(7) of the CAA, promulgated June 20, 1996, applies to all stationary sources with processes that contain more than a threshold quantity of any of 139 regulated substances listed under 40 CFR 68.130. All affected sources will be required to prepare a risk management plan which must be submitted to EPA and be made available to state and local governments and to the public. This paper will provide details of initiatives underway at US Department of Energy (DOE) Oak Ridge Reservation (ORR) Facilities for implementation of the Prevention of Accidental Release Rule. The ORR encompasses three DOE Facilities: the Y-12 Plant, Oak Ridge National Laboratory (ORNL), and the K-25 Site. The Y-12 Plant manufactures component parts for the national nuclear weapons program; the ORNL is responsible for research and development activities including nuclear engineering, engineering technologies, and the environmental sciences; and the K-25 Site conducts a variety of research and development activities and is the home of a mixed waste incinerator. ORR activities underway and soon to be undertaken toward implementation of the Prevention of Accidental Release Rule include: compilation of inventories of regulated substances at all processes at each of the three ORR Facilities for determination of affected processes and facilities; plans for inventory reduction to levels below threshold quantities, where necessary and feasible; determination of the overlap of processes subject to the OSHA PSM Standard and determination of parallel requirements; preparation of Risk Management Plans and Programs for affected processes and facilities including detailed requirements for hazard assessment, prevention, and emergency response.

  3. DOE Order 350.3

    Broader source: Energy.gov [DOE]

    LABOR STANDARDS COMPLIANCE, CONTRACTOR LABOR RELATIONS, AND CONTRACTOR WORKFORCE RESTRUCTURING PROGRAMS

  4. DOE Seeks Further Public Input on How Best To Streamline Existing Regulations

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) has announced a further step to implementing the President’s Executive Order on Improving Regulatory Review.  The Executive Order directs federal agencies to review...

  5. Implementation of the Clean Air Act, Title V operating permit program requirements for the U.S. DOE Oak Ridge Reservation facilities

    SciTech Connect (OSTI)

    Humphreys, M.P. [Dept. of Energy Oak Ridge Operations Office, TN (United States). Environmental Protection Div.

    1998-12-31

    Title V of the Clean Air Act (CAA) establishes a new permit program requiring major sources and sources subject to Title III (Hazardous Air Pollutants) to obtain a state operating permit. Historically, most states have issued operating permits for individual emission units. Under the Title V permit program, a single permit will be issued for all of the emission units at the facility much like the current National Pollutant Discharge Elimination System (NPDES) permit program. The permit will specify all reporting, monitoring, and record-keeping requirements for the facility. Sources required to obtain permits include (a) major sources that emit 100 tons per year or more of any criteria air contaminant, (b) any source subject to the HAP provisions of Title III, (c) any source subject to the acid rain provisions of Title IV, (d) any source subject to New Source Performance Standards, and (e) any source subject to new source review under the nonattainment or Prevention of Significant Deterioration provisions. The State of Tennessee Title V Operating Permit Program was approved by EPA on August 28, 1996. This paper will provide details of initiatives underway at US Department of Energy (DOE) Oak Ridge Reservation (ORR) Facilities for implementation of requirements under the Title V Operating Permit Program. The ORR encompasses three DOE Facilities: the Y-12 Plant, Oak Ridge National Laboratory (ORNL), and the East Tennessee Technology Park (ETTP). The Y-12 Plant manufactures component parts for the national nuclear weapons program; the ORNL is responsible for research and development activities including nuclear engineering, engineering technologies, and the environmental sciences; and the ETTP conducts a variety of research and development activities and is the home of a mixed waste incinerator. Each of the three DOE Facilities is considered a major source under Title V of the CAA.

  6. DOE standard: Firearms safety

    SciTech Connect (OSTI)

    1996-02-01

    Information in this document is applicable to all DOE facilities, elements, and contractors engaged in work that requires the use of firearms as provided by law or contract. The standard in this document provides principles and practices for implementing a safe and effective firearms safety program for protective forces and for non-security use of firearms. This document describes acceptable interpretations and methods for meeting Order requirements.

  7. Order Module--SAFETY SOFTWARE GUIDE FOR USE WITH 10 CFR 830, SUBPART A, QUALITY ASSURANCE REQUIREMENTS, AND DOE O 414.1C, QUALITY ASSURANCE

    Broader source: Energy.gov [DOE]

     According to DOE-STD-1146-2007, General Technical Base Qualification Standard, this module was to summarize the quality assurance information found in attachments 3, 4, and 5, of DOE O 414.1C,...

  8. O:ELECTRICDETROITPP-230-Order.PDF

    Energy Savers [EERE]

    INTERNATIONAL TRANSMISSION COMPANY ORDER NO. PP-230 I. BACKGROUND The Office of Fossil Energy (FE) of the Department of Energy (DOE) has the responsibility for implementing Executive Order (EO) 10485, as amended by EO 12038, which requires the issuance of Presidential permits for the construction, operation, maintenance, or connection of electric transmission facilities at the United States international border. There are four international electric transmission lines that interconnect

  9. Notice of Intent to Revise DOE G 423.1-1A, Implementation Guide for Use in Developing Technical Safety Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-06-05

    The purpose of this revision is to incorporate lessons learned as identified by DOE program offices.

  10. DOE-STD-6002-96 | Department of Energy

    Energy Savers [EERE]

    2-96 DOE-STD-6002-96 August 11, 2005 Safety of Magnetic Fusion Facilities: Requirements This Standard identifies safety requirements for magnetic fusion facilities. Also, safety principles are established to provide a framework within which the requirements can be implemented to build safety into fusion facility design and operations. PDF icon DOE-STD-6002-96, Safety of Magnetic Fusion Facilities: Requirements More Documents & Publications DOE-STD-6003-96 Technical Standards, DOE Orders and

  11. INSTITUTIONALIZING SUSTAINABILITY: IMPLEMENTATION OF EXECUTIVE ORDER 13,514 AND ITS IMPACT ON THE ENVIRONMENTAL, ECONOMIC, AND SOCIAL PERFORMANCE OF PACIFIC NORTHWEST NATIONAL LABORATORY

    SciTech Connect (OSTI)

    Widder, Sarah H.

    2013-07-14

    This article describes the requirements of EO 13514, how PNNL has implemented this mandate and how it has affected the Sustainability Program at PNNL, and makes recommendations about the EO as an effective framework for setting sustainability policy and programs at other institutions.

  12. Nevada Test Site FFCA Consent Order, May 10, 1996 Summary

    Office of Environmental Management (EM)

    Federal Facility Agreement and Consent Order (FFACO) State Nevada Agreement Type Federal Facility Agreement and Consent Order Legal Driver(s) FFCAct Scope Summary Identify sites of potential historic contamination and implement proposed corrective actions Parties DOE; Department of Defense (DoD); Nevada Division of Environmental Protection (NDEP) Date 5/10/1996 SCOPE * Identify sites of potential historic contamination and implement proposed corrective actions. * Establish specific sampling and

  13. DOE Science Showcase - Cool roofs, cool research, at DOE | OSTI, US Dept of

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy, Office of Scientific and Technical Information Cool roofs, cool research, at DOE Science Accelerator returns cool roof documents from 6 DOE Databases Executive Order on Sustainability Secretary Chu Announces Steps to Implement One Cool Roof Cool Roofs Lead to Cooler Cities Guidelines for Selecting Cool Roofs DOE Cool Roof Calculator Visit the Science Showcase homepage. Last updated on Wednesday 12 February 2014

  14. Draft - DOE O 313.1A, Management and Funding of the Department’s Overseas Presence

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The Order delineates DOE and NNSA requirements and responsibilities governing DOE's Overseas Presence in order to effectively implement U.S. national security objectives concerning energy security, nuclear security, and scientific discovery and innovation overseas through the presence of qualified DOE employees and contractors.

  15. Training implementation matrix, Spent Nuclear Fuel Project (SNFP)

    SciTech Connect (OSTI)

    EATON, G.L.

    2000-06-08

    This Training Implementation Matrix (TIM) describes how the Spent Nuclear Fuel Project (SNFP) implements the requirements of DOE Order 5480.20A, Personnel Selection, Qualification, and Training Requirements for Reactor and Non-Reactor Nuclear Facilities. The TIM defines the application of the selection, qualification, and training requirements in DOE Order 5480.20A at the SNFP. The TIM also describes the organization, planning, and administration of the SNFP training and qualification program(s) for which DOE Order 5480.20A applies. Also included is suitable justification for exceptions taken to any requirements contained in DOE Order 5480.20A. The goal of the SNFP training and qualification program is to ensure employees are capable of performing their jobs safely and efficiently.

  16. ORISE: Policy Implementation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Policy Implementation The Oak Ridge Institute for Science and Education (ORISE) assists the U.S. Department of Energy (DOE) Office of Science in the implementation of its program directed at ensuring compliance with federal and DOE regulations pertaining to the protection of human subjects participating in research. The Federal Policy for the Protection of Human Subjects was adopted by DOE on June 18, 1991, as Title 10 Code of Federal Regulations 745, Protection of Human Subjects, and expressed

  17. Portsmouth Administrative Consent Order

    Broader source: Energy.gov [DOE]

    Portsmouth Administrative Consent Order ensures compliance by DOE at the Portsmouth Site with the Resource Recovery and Compensation Act, the Comprehensive Environmental Response, Compensation, and...

  18. DOE-FLEX: DOE's Telework Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-02-11

    The order establishes the requirements and responsibilities for the Departments telework program. Supersedes DOE N 314.1.

  19. DOE-STD-1077-94 | Department of Energy

    Energy Savers [EERE]

    7-94 DOE-STD-1077-94 June 13, 1996 Training Accreditation Program Standard: Requirements and Guidelines Canceled | Supercedes DOE-STD-0101T, TAP-1, and DOE-STD-0103T, TAP-3 The purpose of this Standard is to provide requirements, information, and guidance for the effective implementation of the DOE Training Accreditation Program established by DOE Order 5480.18B, "Nuclear Facility Training Accreditation Program." PDF icon DOE-STD-1077-94, Training Accreditation Program Standard:

  20. DOE-STD-1020-2012

    Broader source: Energy.gov [DOE]

    Natural Phenomena Hazards Analysis and Design Criteria for Department of Energy Facilities Supersedes DOE-STD-1020-2002 This Department of Energy (DOE) Standard (STD)-1020-2012, Natural Phenomena Hazards Analysis and Design Criteria for DOE Facilities, provides criteria and guidance for the analysis and design of facility structures, systems, and components (SSCs) that are necessary to implement the requirements of DOE Order (O) 420.1C, Facility Safety, and to ensure that the SSCs will be able to effectively perform their intended safety functions under the effects of natural phenomena hazards (NPHs).

  1. Order Module--DOE-STD-1104-2009, REVIEW AND APPROVAL OF NUCLEAR FACILITY SAFETY BASIS AND SAFETY DESIGN BASIS DOCUMENTS

    Broader source: Energy.gov [DOE]

    The familiar level of this module is divided into two sections that are intended to provide only an overview of the material contained in DOE-STD-1104-2009, which should be consulted for complete...

  2. Policy Flash 2013-62 Acquisition Letter 09- Revision of Department of Energy (DOE) Order 350.1 and Special H Clause

    Office of Energy Efficiency and Renewable Energy (EERE)

    Questions concerning this policy flash should be directed to Robert M. Myers, Director, Contractor Human Resources Policy Division (MA-612) at (202) 287-1584 or robert.myers@hq.doe.gov.  

  3. Notice of Intent to Revise Department of Energy Order 426.2 Change 1, Personnel Selection, Training, Qualification and Certification Requirements for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The Office of Nuclear Safety consulted field and Headquarters (HQ) offices on whether or not a revision is warranted for DOE O 426.2. As a result, certain aspects of DOE O 426.2 were identified as needing clarification and revision. Based on this feedback, the revision is intended to clarify educational requirements, certification requirements, and applicability. Addressing these concerns should improve operating training programs, and result in less time focused on managing ambiguous or possibly unnecessary requirements.

  4. Notice of Intent to Revise Department of Energy Order 426.2 Change 1, Personnel Selection, Training, Qualification and Certification Requirements for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-02-19

    The Office of Nuclear Safety consulted field and Headquarters (HQ) offices on whether or not a revision is warranted for DOE O 426.2. As a result, certain aspects of DOE O 426.2 were identified as needing clarification and revision. Based on this feedback, the revision is intended to clarify educational requirements, certification requirements, and applicability. Addressing these concerns should improve operating training programs, and result in less time focused on managing ambiguous or possibly unnecessary requirements.

  5. Management and Independent Assessments Guide for Use with 10 CFR Part 830, Subpart A, and DOE O 414.1C, Quality Assurance; DOE M 450.4 -1, Integrated Safety Management System Manual; and DOE O 226.1A, Implementation of DOE Oversight Policy

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-09-27

    This Guide provides information on establishing processes for performing effective assessments. The revision to Guide reflects updated assessment practices, international standards, and changes in DOE expectations. Cancels DOE G 414.1-1A. Certified 11-18-10. Canceled by DOE G 414.1-1C.

  6. Consent Order, Bechtel National, Inc. | Department of Energy

    Energy Savers [EERE]

    National, Inc. Consent Order, Bechtel National, Inc. June 2015 Nuclear Safety Enforcement Consent Order issued to Bechtel National, Inc. regarding deficiencies in facility design and authorization basis documentation, vessel welds, and quality assurance and corrective action program implementation at the Waste Treatment and Immobilization Plant. On June 1, 2015, the U.S. Department of Energy's (DOE) Office of Enforcement issued a Consent Order (NCO-2015-02) to Bechtel National, Inc., the

  7. N:\WPWIN60\ORDERS\PP-118.ORD

    Office of Environmental Management (EM)

    HILL COUNTY ELECTRIC COOPERATIVE, INC. ORDER NO. PP-118 I. BACKGROUND The Office of Fossil Energy (FE) of the Department of Energy (DOE) has the responsibility for implementing Executive Order 10485, as amended by Executive Order 12038, which requires the issuance of Presidential permits for the construction, connection, operation, and maintenance of electric transmission facilities at the United States international border. In an application dated July 11, 1996, as amended on July 25, 1996,

  8. Implementation Guide - Aviation Management, Operations, Maintenance, Security, and Safety for Use with DOE O 440.2B Chg 1, Aviation Management and Safety

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-10-17

    This Guide provides detailed information to help all personnel, responsible for a part of the aviation program, understand and comply with the rules and regulations applicable to their assignments. Cancels DOE G 440.2B-2. Canceled by DOE N 251.110.

  9. 324 Building fire hazards analysis implementation plan

    SciTech Connect (OSTI)

    BARILO, N.F.

    1999-05-10

    In March 1998, the 324 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the U S. Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (BWHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in six areas and provided 20 recommendations to bring the 324 Building into compliance with DOE Order 5480 7A. Additionally, one observation was provided. A status is provided for each recommendation in this document. The actions for recommendations associated with the safety related part of the 324 Building and operation of the cells and support areas were evaluated using the Unreviewed Safety Question (USQ) process BWHC will use this Implementation Plan to bring the 324 Building and its operation into compliance with DOE Order 5480 7A and RLID 5480.7.

  10. New DOE Reports on Smart Grid Technologies Seek to Promote Innovation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    New DOE Reports on Smart Grid Technologies Seek to Promote Innovation, Privacy and Access October 5, 2010 - 12:00am Addthis Washington, D.C. - In order to implement recommendations ...

  11. DOE-STD-1196-2011

    Broader source: Energy.gov [DOE]

    Concentration Technical Standard This standard supports the implementation of Department of Energy (DOE) Order 458.1, Radiation Protection of the Public and the Environment. It also establishes the numerical values of DCSs in a manner reflecting the current state of knowledge and practice in radiation protection

  12. Implementation Guide - Aviation Management, Operations, Maintenance, Security, and Safety for Use with DOE O 440.2B, Aviation Management and Safety

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-07-18

    This Guide provides detailed information to help all personnel, responsible for a part of the aviation program, understand and comply with the rules and regulations applicable to their assignments. Canceled by DOE G 440.2B-2A.

  13. Former Worker Medical Screening Program Implementation | Department...

    Office of Environmental Management (EM)

    Medical Screening Program Implementation Program implementation focuses on four specific activities, which are: Outreach: Identify and notify eligible DOE workers about FWP...

  14. Draft - DOE G 410.2-1, Nuclear Material Disposition

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    This document provides a roadmap for implementing the requirements for disposition of nuclear material as outlined in the U.S. Department of Energy (DOE) Order 410.2, Management of Nuclear Materials, and DOE Order 474.2, Nuclear Material Control and Accountability. This Guide provides the basic framework for the nuclear material disposition process, includes information related to the Programmatic Value Determination (PVD) process, and identifies Discard Limits (DL) for specific low-equity nuclear materials.

  15. NEW - DOE O 470.6, Technical Security Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    This order implements the Department of Energy (DOE) Technical Security Program (TSP). This program represents the convergence of two distinct disciplines: Counterintelligence (CI) and Security Countermeasures. The elements of the TSP are driven by national level, interagency programs that are codified in various laws, Executive Orders, national polices and directives.

  16. FEMP: Seven steps to saving: How to implement energy-saving projects

    SciTech Connect (OSTI)

    Pitchford, P.

    1999-05-26

    The Energy Policy Act of 1992 and supporting Executive Orders have directed Federal agencies to implement cost-effective energy and water efficient measures to help conserve natural resources and protect the environment. Federal energy and facility managers can make a big difference. DOE's Federal Energy Management Program (FEMP) has outlined seven steps on how to implement an energy-saving project.

  17. Memorandum, Drug Testing at DOE - September 14, 2007 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Policy, Guidance & Reports » Security » Memorandum, Drug Testing at DOE - September 14, 2007 Memorandum, Drug Testing at DOE - September 14, 2007 As established in his memorandum dated September 14, 2007, the Secretary has determined that applicants for, and holders of, a Department of Energy (DOE) Q or L access authorization (security clearance) will be in Testing Designated Positions (TDP) as specified in DOE Order 3792.3, Drug-Free Federal Workplace Testing Implementation Program, for

  18. SUMMARY OF REGULATIONS IMPLEMENTING FEDERAL POWER ACT SECTION 216 |

    Energy Savers [EERE]

    Department of Energy SUMMARY OF REGULATIONS IMPLEMENTING FEDERAL POWER ACT SECTION 216 SUMMARY OF REGULATIONS IMPLEMENTING FEDERAL POWER ACT SECTION 216 The Energy Policy Act of 2005 added section 216(h) to the Federal Power Act providing for the Department of Energy to act as the lead agency for coordinating all applicable Federal authorizations and related environmental reviews required under Federal law in order to site an electric transmission facility. The Act authorized DOE to issue

  19. E.O. 13693: Recent Developments, Implementation Updates, and Opportunities

    Broader source: Energy.gov (indexed) [DOE]

    | Department of Energy 3, 2015 1:30PM to 3:00PM EST This Federal Energy Management Program seminar will share technologies, strategies, and best practices that DOE and other agencies are using to implement and fund Executive Order 13693 goals. Topics include clean energy, water, GHG reduction, electronics stewardship, sustainable acquisition, waste reduction, pollution prevention, and environmental management

  20. Drug-Free Federal Workplace Testing Implementation Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1988-07-29

    The order provides guidance and policy for the administration, application and implementation of the DOE Drug-free Federal Workplace Plan and other regulations that facilitate the maintenance of a drug-free Federal workplace through the establishment of programs to test for the use of illegal drugs. Chg 1, dated 8-21-92

  1. PRESIDENTIAL PERMIT NORTHERN STATES POWER COMPANY ORDER NO. PP-231

    Energy Savers [EERE]

    NORTHERN STATES POWER COMPANY ORDER NO. PP-231 I. BACKGROUND The Office of Fossil Energy (FE) of the Department of Energy (DOE) has the responsibility for implementing Executive Order (EO) 10485, as amended by EO 12038, which requires the issuance of Presidential permits for the construction, operation, maintenance, and connection of electric transmission facilities at the United States international border. On November 2, 2000, Northern States Power Company (NSP) filed an application with the

  2. International Refrigeration: Order (2012-CE-1510) | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    International Refrigeration: Order (2012-CE-1510) International Refrigeration: Order (2012-CE-1510) July 20, 2012 DOE ordered International Refrigeration Products to pay an 8,000 ...

  3. Notice of Intent to Develop DOE G 415.1-1, Information Technology Project Execution Model Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-03-06

    The proposed guide will support consistent and effective implementation of DOE O 415.1 and will assist IT Program and Project Managers in effectively managing and applying sound project management to IT projects subject to that order.

  4. Comments of Southern Company Services, Inc. on DOE Request for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Southern Company Services, Inc. on DOE Request for Information-Implementing the National ... Comments of Southern Company Services, Inc. on DOE Request for Information-Implementing ...

  5. Code of Federal Regulations Procedural Rules for DOE Nuclear Activities Part II

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) is issuing procedural rules to be used in applying its substantive regulations and orders relating to nuclear safety. These procedural rules are intended to be an essential part of the framework through which DOE deals with its contractors, subcontractors, and suppliers to ensure its nuclear facilities are operated in a manner that protects public and worker safety and the environment. In particular, this part sets forth the procedures to implement the provisions of the Price- Anderson Amendments Act of 1988 (PAAA) which subjects DOE contractors to potential civil and criminal penalties for violations of DOE rules, regulations and orders relating to nuclear safety (DOE Nuclear Safety Requirements).

  6. Radiological Protection for DOE Activities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1995-09-29

    Establishes radiological protection program requirements that, combined with 10 CFR 835 and its associated implementation guidance, form the basis for a comprehensive program for protection of individuals from the hazards of ionizing radiation in controlled areas. Extended by DOE N 441.3. Cancels DOE 5480.11, DOE 5480.15, DOE N 5400.13, DOE N 5480.11; please note: the DOE radiological control manual (DOE/EH-0256T)

  7. DOE-STD-1082-94 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This standard describes an acceptable method to prepare, review, and approve implementation plans for DOE nuclear safety requirements. DOE requirements are identified in DOE Rules, ...

  8. DOE-HDBK-1118-99 | Department of Energy

    Energy Savers [EERE]

    9, 2014 Guide to Good Practices for Continuing Training Reaffirmed 2014 The Best Practices for Continuing Training handbook provides contractor training organizations with information and methods useful in the development and implementation of continuing training programs that are using a Systematic Approach to Training (SAT) process. It can be used with DOE orders, standards, and handbooks to aid in the development of continuing training programs. It should be used in conjunction with the DOE

  9. DOE-HDBK-1214-2014 | Department of Energy

    Energy Savers [EERE]

    4-2014 DOE-HDBK-1214-2014 July 2014 This handbook is designed to assist in performing routine Conduct of Operations field observations (which include walkthroughs and tours), as well as provide basic guidance in preparing for a more formal assessment. DOE Order 422.1, Conduct of Operations, defines the key terms: A Conduct of Operations Program is the formal documentation, practices, and actions implementing disciplined and structured operations that support mission success and ensure worker,

  10. DOE American Indian and Alaska Natives Tribal Government Policy |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy American Indian and Alaska Natives Tribal Government Policy DOE American Indian and Alaska Natives Tribal Government Policy This Policy sets forth the principles to be followed by the Department of Energy (DOE) to ensure an effective implementation of a government to government relationship with American Indian and Alaska Native tribal governements. This Policy is based on the United States Constitution, treaties, Supreme Court decisions, Executive Orders, statutes,

  11. Explosive Safety Manual, to a New Order

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-12-02

    This memorandum provides justification for the conversion of Department of Energy (DOE) Manual (M) 440.1-1A, DOE Explosives Safety Manual, dated 1-9-06, into a new DOE Order.

  12. Aero-Tech: Order (2010-CE-1012)

    Broader source: Energy.gov [DOE]

    DOE issued an Order and closed this case against Aero-Tech Light Bulb Co., without civil penalty, after DOE found that Aero-Tech manufactured and/or privately labeled incandescent reflector lamps, but did not violate DOE regulations.

  13. Paperclips Etc. Special Order Form

    Broader source: Energy.gov (indexed) [DOE]

    PSS-02.2 (March 7, 2011) Replaces PSS-02.1 PAPERCLIPS Etc. SPECIAL Orders Form This form is used to order supplies that are not readily available in the DOE HQ self-service supply...

  14. DOE-STD-3009-2014 Training Modules (Changes to DOE-STD-3009 and

    Office of Environmental Management (EM)

    Expectations for Effective Implementation) | Department of Energy Training Modules (Changes to DOE-STD-3009 and Expectations for Effective Implementation) DOE-STD-3009-2014 Training Modules (Changes to DOE-STD-3009 and Expectations for Effective Implementation) March 2, 2015 These modules are training for DOE-STD-3009-2014, Preparation of Nonreactor Nuclear Facility Documented Safety Analysis. It focuses on Changes to DOE-STD-3009 and Expectations for Effective Implementation. PDF icon

  15. DOE Policies | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Policies DOE Policies DOE Policies The CIO defines IT processes and policies using the Common Baseline for IT Management, consistent with OMB M-15-14. Access policy documents from the list below: Information Management Planning DOE Guide to IT Capital Planning and Investment, September 2016(pdf) DOE G 242.1-1, Forms Management Guide (pdf) Web Domain Name Policy REFERENCE NUMBER POLICY NAME APPROVED DATE DESCRIPTION DOE O 200.1A Information Technology Management Dec 23, 2008 Implementation

  16. DOE Corporate Operating Experience Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-04-08

    The Order institutes a DOE wide program for the management of operating experience to prevent adverse operating incidents and facilitate the sharing of good work practices among DOE sites. Supersedes DOE O 210.2.

  17. index | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    includes numerical simulators, analytical models, databases, and documentation. Smart Grid The DOE Smart Grid Implementation Strategy team (previously the Modern Grid...

  18. doe order 144.1.pdf

    National Nuclear Security Administration (NNSA)

  19. Transition Implementation Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-04-24

    This Guide was prepared to aid in the development, planning, and implementation of requirements and activities during the transition phase at Department of Energy (DOE) facilities that have been declared or are forecast to become excess to any future mission requirements.

  20. Safeguards and Security Oversight and Assessments Implementation Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-12-21

    This Guide identifies acceptable methods for implementing the safeguards and security provisions of DOE O 226.1A. Canceled by DOE N 251.80.

  1. Derivation of general analytic gradient expressions for density-fitted post-Hartree-Fock methods: An efficient implementation for the density-fitted second-order Mřller–Plesset perturbation theory

    SciTech Connect (OSTI)

    Bozkaya, U?ur

    2014-09-28

    General analytic gradient expressions (with the frozen-core approximation) are presented for density-fitted post-HF methods. An efficient implementation of frozen-core analytic gradients for the second-order Mřller–Plesset perturbation theory (MP2) with the density-fitting (DF) approximation (applying to both reference and correlation energies), which is denoted as DF-MP2, is reported. The DF-MP2 method is applied to a set of alkanes, conjugated dienes, and noncovalent interaction complexes to compare the computational cost of single point analytic gradients with MP2 with the resolution of the identity approach (RI-MP2) [F. Weigend and M. Häser, Theor. Chem. Acc. 97, 331 (1997); R. A. Distasio, R. P. Steele, Y. M. Rhee, Y. Shao, and M. Head-Gordon, J. Comput. Chem. 28, 839 (2007)]. In the RI-MP2 method, the DF approach is used only for the correlation energy. Our results demonstrate that the DF-MP2 method substantially accelerate the RI-MP2 method for analytic gradient computations due to the reduced input/output (I/O) time. Because in the DF-MP2 method the DF approach is used for both reference and correlation energies, the storage of 4-index electron repulsion integrals (ERIs) are avoided, 3-index ERI tensors are employed instead. Further, as in case of integrals, our gradient equation is completely avoid construction or storage of the 4-index two-particle density matrix (TPDM), instead we use 2- and 3-index TPDMs. Hence, the I/O bottleneck of a gradient computation is significantly overcome. Therefore, the cost of the generalized-Fock matrix (GFM), TPDM, solution of Z-vector equations, the back transformation of TPDM, and integral derivatives are substantially reduced when the DF approach is used for the entire energy expression. Further application results show that the DF approach introduce negligible errors for closed-shell reaction energies and equilibrium bond lengths.

  2. Extension of DOE O 430.2, In-House Energy Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-12-13

    This Notice extends DOE O 430.2, IN-HOUSE ENERGY MANAGEMENT, dated 6-13-96 until 6-13-01, unless sooner rescinded. The Order is being revised to implement Executive Order 13123, Greening of the Government Through Efficient Energy Management, and a Secretarial Memorandum, Pollution Prevention and Energy Efficiency Leadership Goals, and to include the acquisition, planning and management of utilities. Does not cancel other directives.

  3. DRAFT - DOE G 436.1-1 Federal Sustainable Print Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    This Guide provides acceptable approaches for implementing the IT sustainability requirements and criteria required by DOE Order 436.1, Departmental Sustainability, dated 5-2-11 and related to the sustainability requirements contained in Executive Order 13693, "Planning for Federal Sustainability in the Next Decade”.

  4. New - DOE G 436.1-1, Federal Sustainable Print Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The Guide provides acceptable approaches for implementing the IT sustainability requirements and criteria required by DOE Order 436.1, Departmental Sustainability, dated 5-2-11, and related to the sustainability requirements contained in Executive Order 13693, "Planning for Federal Sustainability in the Next Decade."

  5. State Energy Program Helps States Plan and Implement Energy Efficiency...

    Energy Savers [EERE]

    Helps States Plan and Implement Energy Efficiency State Energy Program Helps States Plan and Implement Energy Efficiency The U.S. Department of Energy (DOE) State Energy Program...

  6. DNA Clone Ordering from Shotgun Clone Libraries

    Energy Science and Technology Software Center (OSTI)

    1995-11-28

    CORD is an implementation of an algorithm for determining the order of clones from shotgun clone libraries.

  7. New - DOE O 452.4C, Security and Use Control of Nuclear Explosives and Nuclear Weapons

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The order establishes requirements to implement the nuclear explosive security and use control elements of DOE O 452.1E to ensure authorized use, when directed by proper authority, and protect against deliberate unauthorized acts, deliberate unauthorized use, and denial of authorized use. Cancels DOE O 452.4B, dated 1-22-10.

  8. Implementation Standing Technical Committee Presentation

    Office of Environmental Management (EM)

    Implementation Standing Technical Committee (I-STC) Meeting Deane Evans (NJIT) and Stacy Hunt (Confluence), co-chairs March 1, 2012 What is the I-STC? * Focused on identifying and documenting key barriers and opportunities in implementation of Building America (BA) research results How Does the I-STC Work? * Fosters discussion and prioritization of key research activities * Documents these for DOE/NREL planning purposes 2012 Focus * Clarify key priorities and ensure proper prioritization *

  9. Draft Energy Sector Cybersecurity Framework Implementation Guidance...

    Broader source: Energy.gov (indexed) [DOE]

    in the Federal Register, inviting the public to comment on DOE's Energy Sector Cybersecurity Framework Implementation Guidance. Comments must be received on or before October...

  10. TASK ORDER

    National Nuclear Security Administration (NNSA)

    NA0000XXX Task Order No: DE-DT000XXXX Statement of Work August 7, 2015 Task Order Title: Design, Integration, Construction, Communications, and Engineering (DICCE) Services for Port of Cat Lai, Vietnam. Scope: The Contractor shall design, construct, and integrate fully functional portal monitor and communications systems at designated sites in Vietnam. * Port of Cat Lai Requirements Documents: The following task order requirements describe key milestones and deliverables. For a more complete

  11. Ordering Information

    Gasoline and Diesel Fuel Update (EIA)

    coal industry Natural gas trade (Table 4.3) Ordering Information This publication and other Energy Information Administration (EIA) publications may be purchased from the...

  12. Final Report for DOE Grant DE-FG02-03ER25579; Development of High-Order Accurate Interface Tracking Algorithms and Improved Constitutive Models for Problems in Continuum Mechanics with Applications to Jetting

    SciTech Connect (OSTI)

    Puckett, Elbridge Gerry; Miller, Gregory Hale

    2012-10-14

    Much of the work conducted under the auspices of DE-FG02-03ER25579 was characterized by an exceptionally close collaboration with researchers at the Lawrence Berkeley National Laboratory (LBNL). For example, Andy Nonaka, one of Professor Miller's graduate students in the Department of Applied Science at U. C. Davis (UCD) wrote his PhD thesis in an area of interest to researchers in the Applied Numerical Algorithms Group (ANAG), which is a part of the National Energy Research Supercomputer Center (NERSC) at LBNL. Dr. Nonaka collaborated closely with these researchers and subsequently published the results of this collaboration jointly with them, one article in a peer reviewed journal article and one paper in the proceedings of a conference. Dr. Nonaka is now a research scientist in the Center for Computational Sciences and Engineering (CCSE), which is also part of the National Energy Research Supercomputer Center (NERSC) at LBNL. This collaboration with researchers at LBNL also included having one of Professor Puckett's graduate students in the Graduate Group in Applied Mathematics (GGAM) at UCD, Sarah Williams, spend the summer working with Dr. Ann Almgren, who is a staff scientist in CCSE. As a result of this visit Sarah decided work on a problem suggested by the head of CCSE, Dr. John Bell, for her PhD thesis. Having finished all of the coursework and examinations required for a PhD, Sarah stayed at LBNL to work on her thesis under the guidance of Dr. Bell. Sarah finished her PhD thesis in June of 2007. Writing a PhD thesis while working at one of the University of California (UC) managed DOE laboratories is long established tradition at UC and Professor Puckett has always encouraged his students to consider doing this. Another one of Professor Puckett's graduate students in the GGAM at UCD, Christopher Algieri, was partially supported with funds from DE-FG02-03ER25579 while he wrote his MS thesis in which he analyzed and extended work originally published by Dr. Phillip Colella, the head of ANAG, and some of his colleagues. Chris Algieri is now employed as a staff member in Dr. Bill Collins' Climate Science Department in the Earth Sciences Division at LBNL working with computational models of climate change. Finally, it should be noted that the work conducted by Professor Puckett and his students Sarah Williams and Chris Algieri and described in this final report for DOE grant # DE-FC02-03ER25579 is closely related to work performed by Professor Puckett and his students under the auspices of Professor Puckett's DOE SciDAC grant DE-FC02-01ER25473 An Algorithmic and Software Framework for Applied Partial Differential Equations: A DOE SciDAC Integrated Software Infrastructure Center (ISIC). Dr. Colella was the lead PI for this SciDAC grant, which was comprised of several research groups from DOE national laboratories and five university PI's from five different universities. In theory Professor Puckett tried to use funds from the SciDAC grant to support work directly involved in implementing algorithms developed by members of his research group at UCD as software that might be of use to Puckett's SciDAC CoPIs. (For example, see the work reported in Section 2.2.2 of this final report.) However, since there is considerable lead time spent developing such algorithms before they are ready to become `software' and research plans and goals change as the research progresses, Professor Puckett supported each member of his research group partially with funds from the SciDAC APDEC ISIC DE-FC02-01ER25473 and partially with funds from this DOE MICS grant DE-FC02-03ER25579. This has necessarily resulted in a significant overlap of project areas that were funded by both grants. In particular, both Sarah Williams and Chris Algieri were supported partially with funds from grant # DE-FG02-03ER25579, for which this is the final report, and in part with funds from Professor Puckett's DOE SciDAC grant # DE-FC02-01ER25473. For example, Sarah Williams received support from DE-FC02- 01ER25473 and DE-FC02-03ER25579, both while at UCD taking cla

  13. Implementation Manual

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Skip navigation links BPA Energy Efficiency Plan BPA Post-2011 EE Role Implementation Manual Archives IM Document Library Interim Solution 2.0 Files Low Income Efficiency...

  14. 1982 Orders

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOCKET FE CITE DATE NUMBER APPLICANT NAME ORDER NO. 70116.ERA 121482 82-04-LNG PhillipsMarathon 49 70552.ERA 113082 82-09-NG Northern Natural Gas 48 70541.ERA 110182...

  15. DOE-STD-3009-2014 Training Modules (Changes to DOE-STD-3009 and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Training Modules (Changes to DOE-STD-3009 and Expectations for Effective Implementation) DOE-STD-3009-2014 Training Modules (Changes to DOE-STD-3009 and Expectations for Effective...

  16. DOE Laboratory Accreditation Program | Department of Energy

    Office of Environmental Management (EM)

    DOE Laboratory Accreditation Program DOE Laboratory Accreditation Program DOE Laboratory Accreditation Program Welcome Administered by the AU Office of Environment, Health, Safety and Security, the DOE Laboratory Accreditation Program (DOELAP) is responsible for implementing performance standards for DOE contractor external dosimetry and radiobioassay programs through periodic performance testing and on-site program assessments. The performance testing function is carried out by the Radiological

  17. DOE F 4250.4 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE F 4250.4 Form used for ordering supplies or services. PDF icon ORDER FOR SUPPLIES OR SERVICES: SCHEDULE CONTINUATION More Documents & Publications DOE F 4250.3 DOE F 4220.2 DOE ...

  18. Emerson: Order (2014-CE-54001)

    Broader source: Energy.gov [DOE]

    DOE ordered Emerson Electric Co. to pay a $8,000 civil penalty after finding Emerson had failed to certify that certain models of metal halide lamp fixtures comply with the applicable energy conservation standards.

  19. Trastar: Order (2013-CE-49003)

    Broader source: Energy.gov [DOE]

    DOE ordered Trastar Inc. to pay a $8,000 civil penalty after finding Trastar had failed to certify that certain basic models of traffic signal modules and pedestrian modules comply with the applicable energy conservation standards.

  20. Simkar: Order (2012-SE-5408)

    Broader source: Energy.gov [DOE]

    DOE ordered Simkar Corporation to pay a $28,193 civil penalty after finding Simkar had manufactured and distributed in commerce in the U.S. 326 units of a variety of noncompliant metal halide lamp fixtures basic models.

  1. TMP: Order (2013-CE-5334)

    Broader source: Energy.gov [DOE]

    DOE ordered TMP Manufacturing Company, Inc. to pay a $8,000 civil penalty after finding TMP had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  2. Sylvane: Order (2013-CE-36005)

    Broader source: Energy.gov [DOE]

    DOE ordered Sylvane, Inc. to pay a $4,000 civil penalty after finding Sylvane had failed to certify that certain models of dehumidifiers comply with the applicable energy conservation standards.

  3. Averen: Order (2010-CW-0711)

    Broader source: Energy.gov [DOE]

    DOE ordered Averen, Inc. to pay a $5,000 civil penalty after finding Averen had failed to certify that certain models of faucets comply with the applicable water conservation standards.

  4. Perlick: Order (2011-SE-1401)

    Broader source: Energy.gov [DOE]

    DOE ordered Perlick Corporation to pay a $400 civil penalty after finding Perlick had manufactured and distributed in commerce in the U.S. at least two noncompliant model HP48RO, electric refrigerators.

  5. Aircooler: Order (2013-CE-5338)

    Broader source: Energy.gov [DOE]

    DOE ordered Aircooler Corporation to pay a $8,000 civil penalty after finding Aircooler had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  6. Nicor: Order (2014-CE-32016)

    Broader source: Energy.gov [DOE]

    DOE ordered Nicor, Inc. to pay a $8,000 civil penalty after finding Nicor had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  7. Amerikooler: Order (2013-CE-5307)

    Broader source: Energy.gov [DOE]

    DOE ordered Amerikooler, Inc. to pay a $8,000 civil penalty after finding Amerikooler had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  8. Amerisink: Order (2010-CW-0710)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE ordered Amerisink, Inc. to pay a $5,000 civil penalty after finding Amerisink had failed to certify that certain models of faucets comply with the applicable water conservation standards.

  9. Leer: Order (2013-CE-5325)

    Broader source: Energy.gov [DOE]

    DOE ordered Leer, Inc. to pay a $8,000 civil penalty after finding Leer had failed to certify that certain models of walk-in cooler and freezer (WICF) components comply with the applicable energy conservation standards.

  10. Electrolux: Order (2012-CE-1901)

    Broader source: Energy.gov [DOE]

    DOE ordered Electrolux North America to pay a $6,500 civil penalty after finding Electrolux had failed to certify that certain dishwashers comply with the applicable energy conservation standard.

  11. Litex: Order (2014-CE-32011)

    Broader source: Energy.gov [DOE]

    DOE ordered Litex Industries, Limited to pay a $8,000 civil penalty after finding Litex had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  12. Dacor: Order (2014-CE-23010)

    Broader source: Energy.gov [DOE]

    DOE ordered Dacor to pay a $8,000 civil penalty after finding Dacor had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  13. Whirlpool: Order (2014-CE-21010)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE ordered Whirlpool Corporation to pay a $8,000 civil penalty after finding Whirlpool had failed to certify that certain models of residential clothes dryers comply with the applicable energy conservation standards.

  14. DHI: Order (2014-CE-32004)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE ordered DHI Corp. to pay a $8,000 civil penalty after finding DHI had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  15. Vaxcel: Order (2014-CE-32006)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE ordered Vaxcel International Co., Ltd. to pay a $8,000 civil penalty after finding Vaxcel had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  16. Electrolux: Order (2014-CE-23015)

    Broader source: Energy.gov [DOE]

    DOE ordered Electrolux North America, Inc. to pay a $16,000 civil penalty after finding Electrolux had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  17. Winix: Order (2012-CE-3607)

    Broader source: Energy.gov [DOE]

    DOE ordered Cloud 9 Marketing, Inc. d/b/a Winix, Inc., to pay a $8,000 civil penalty after finding Winix had failed to certify that certain models of dehumidifiers comply with the applicable energy conservation standards.

  18. Smeg: Order (2014-CE-23003)

    Broader source: Energy.gov [DOE]

    DOE ordered Smeg USA, Inc. to pay a $16,000 civil penalty after finding Smeg had failed to certify that certain models of refrigerators/refrigerator-freezers/freezers, dishwashers, and cooking products comply with the applicable energy conservation standards.

  19. Curtis: Order (2015-CE-14021)

    Broader source: Energy.gov [DOE]

    DOE ordered Curtis International, Ltd. to pay a $5,800 civil penalty after finding Curtis had failed to certify that refrigerator-freezer basic model FR9211 complies with the applicable energy conservation standards.

  20. Perlick: Order (2013-SE-14002)

    Broader source: Energy.gov [DOE]

    DOE ordered Perlick Corporation to pay a $60,725 civil penalty after finding Perlick had manufactured and distributed in commerce in the U.S. 347 units of basic model HP48RR, a noncompliant refrigerator.

  1. BSH: Order (2013-CE-2001)

    Broader source: Energy.gov [DOE]

    DOE ordered BSH Home Appliances Corp. to pay a $8,000 civil penalty after finding BSH had failed to certify that certain models of residential clothes washers comply with the applicable energy/water conservation standards.

  2. Avanti: Order (2013-CE-2105)

    Broader source: Energy.gov [DOE]

    DOE ordered Avanti Products, LLC to pay a $8,000 civil penalty after finding Avanti had failed to certify that certain models of residential clothes dryers comply with the applicable energy conservation standards.

  3. Almo: Order (2012-CE-1416)

    Broader source: Energy.gov [DOE]

    DOE ordered Almo Corporation to pay a $6,500 civil penalty after finding Almo had failed to certify that certain models of residential refrigerators comply with the applicable energy conservation standards.

  4. Northland: Order (2014-CE-23002)

    Broader source: Energy.gov [DOE]

    DOE ordered Northland Corporation d/b/a AGA Marvel to pay a $16,000 civil penalty after finding Northland had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  5. Sunpentown: Order (2012-CE-1505)

    Broader source: Energy.gov [DOE]

    DOE ordered Sunpentown International Inc. to pay a $12,160 civil penalty after finding Sunpentown had failed to certify that certain models of room air conditioners comply with the applicable energy conservation standards.

  6. Quorum: Order (2014-CE-32013)

    Broader source: Energy.gov [DOE]

    DOE ordered Davoil, Inc. d/b/a Quorum International, Inc. to pay a $8,000 civil penalty after finding Quorum had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  7. Sears: Order (2012-CE-3606)

    Broader source: Energy.gov [DOE]

    DOE ordered Sears, Roebuck & Co. to pay an $8,000 civil penalty after finding Sears had failed to certify that Sears dehumidifiers comply with the applicable energy conservation standard.

  8. Haier: Order (2011-CE-2104)

    Broader source: Energy.gov [DOE]

    DOE ordered Haier to pay an $20,000 civil penalty after finding Haier had failed to certify that Haier residential clothes dryers comply with the applicable energy conservation standard.

  9. TCP: Order (2011-CE-3501)

    Broader source: Energy.gov [DOE]

    DOE ordered Technical Consumer Products, Inc. to pay a $3,000 civil penalty after finding TCP had failed to certify that a certain model of medium base compact fluorescent lamp (CFL) complies with the applicable energy conservation standards.

  10. Leotek: Order (2013-CE-4903)

    Broader source: Energy.gov [DOE]

    DOE ordered Leotek Electronics USA Corp. to pay a $8,000 civil penalty after finding Leotek had failed to certify that certain models of traffic signal modules and pedestrian modules comply with the applicable energy conservation standards.

  11. Keystone: Order (2013-CE-2601)

    Broader source: Energy.gov [DOE]

    DOE ordered Keystone Technologies, LLC to pay a $8,000 civil penalty after finding Keystone had failed to certify that certain models of fluorescent lamp ballasts comply with the applicable energy conservation standards.

  12. Electrolux: Order (2015-CE-14020)

    Broader source: Energy.gov [DOE]

    DOE ordered Electrolux North America, Inc. to pay a $20,000 civil penalty after finding Electrolux had failed to certify that certain models of refrigerator-freezers comply with the applicable energy conservation standards.

  13. Acuity: Order (2013-CE-4802)

    Broader source: Energy.gov [DOE]

    DOE ordered Acuity Brands Lighting to pay a $8,000 civil penalty after finding Acuity had failed to certify that certain models of illuminated exit signs comply with the applicable energy conservation standards.

  14. Hydac: Order (2012-SE-4107)

    Broader source: Energy.gov [DOE]

    DOE ordered Hydac Technology Corporation to pay a $29,000 civil penalty after finding Hydac had manufactured and distributed in commerce in the U.S. noncompliant electric motors.

  15. DOE Corporate Operating Experience Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-06-12

    The Order establishes a DOE wide program for management of operating experience to prevent adverse operating incidents and to expand the sharing of good work practices among DOE sites. Canceled by DOE O 210.2A. Does not cancel other directives.

  16. DOE M 483.1-1 | Department of Energy

    Office of Environmental Management (EM)

    3.1-1 DOE M 483.1-1 DOE Cooperative Research and Development Agreements Manual PDF icon DOE M 483.1-1 More Documents & Publications DOE Cooperative Research and Development Agreements DOE Order 482.1

  17. Environmental Justice Strategy (DOE, 2008) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Justice Strategy (DOE, 2008) Environmental Justice Strategy (DOE, 2008) In response to Executive Order 12898, DOE prepared and issued its Environmental Justice Strategy in 1995. ...

  18. Microsoft Word - Mirant February 07 order draft DRH mark 4.doc

    Office of Environmental Management (EM)

    On January 18, 2006, DOE issued a notice of the emergency order (published in the Federal Register on January 20, 2006, 71 FR 3279) in which it committed to preparing a Special Environmental Analysis (SEA) pursuant to the Council on Environmental Quality's Regulations Implementing the Procedural Requirements of the National Environmental Policy Act of 1969 (NEPA), 40 C.F.R. 1506.11. The SEA would examine the potential impacts of the operation of the Plant pursuant to Order No. 202-05- 3. DOE

  19. Cancellation of DOE G 440.2B-1A

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-02-15

    Cancels DOE G 440.2B-1A, Implementation Guide - Performance Indicators (Metrics) for Use with Doe O 440.2B, Aviation Management and Safety.

  20. NAP Coalition Response to DOE RFI: Addressing Policy and Logistical...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NAP Coalition Response to DOE RFI: Addressing Policy and Logistical Challenges to Smart Grid Implementation NAP Coalition Response to DOE RFI: Addressing Policy and Logistical ...

  1. Ambient Corporation's Reply comments to DOE RFI: Addressing Policy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ambient Corporation's Reply comments to DOE RFI: Addressing Policy and Logistical Challenges to Smart Grid Implementation Ambient Corporation's Reply comments to DOE RFI: ...

  2. Worker Protection Management for DOE Federal and Contractor Employees Guide for use with DOE O 440.1

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-07-10

    This implementation guide provides general information and methodologies that DOE finds acceptable in meeting the Department's requirements defined in DOE O 440.1.

  3. Guidance for Developing and Implementing Institutional Controls |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Guidance for Developing and Implementing Institutional Controls Guidance for Developing and Implementing Institutional Controls This guidance document is to help U.S. Department of Energy (DOE) Office of Legacy Management (LM) personnel understand what is necessary and acceptable for implementing the provisions of DOE Policy 454.1, Use of Institutional Controls, for long-term surveillance and maintenance (LTS&M) at LM sites. PDF icon Guidance for Developing and

  4. Implementation, Certification and Enforcement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appliance & Equipment Standards » Implementation, Certification and Enforcement Implementation, Certification and Enforcement The U.S. Department of Energy (DOE) is authorized by the Energy Policy and Conservation Act of 1975 (as amended) to enforce compliance with the energy and water conservation standards established for certain consumer products and commercial and industrial equipment. To ensure the implementation of the current standards for covered appliances and equipment, DOE has

  5. Galvin Electricity Initiative DOE RFI DOE RFI 2010-23251: Addressing Policy

    Energy Savers [EERE]

    and Logistical Challenges to Smart Grid Implementation | Department of Energy Galvin Electricity Initiative DOE RFI DOE RFI 2010-23251: Addressing Policy and Logistical Challenges to Smart Grid Implementation Galvin Electricity Initiative DOE RFI DOE RFI 2010-23251: Addressing Policy and Logistical Challenges to Smart Grid Implementation The Galvin Electricity Initiative, a non-profit organization, has dedicated its resources to researching and developing both prototypes and policy reforms

  6. DOE Technical Assistance Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procuring and Implementing Solar Projects on Public Buildings Sarah Truitt, NREL Kim Owens & Craig Schultz, ICF International December 8, 2010 Photo courtesy of Bella Energy 2 | TAP Webinar eere.energy.gov What is TAP? DOE's Technical Assistance Program (TAP) supports the Energy Efficiency and Conservation Block Grant Program (EECBG) and the State Energy Program (SEP) by providing state, local, and tribal officials the tools and resources needed to implement successful and sustainable clean

  7. END POINT IMPLEMENTATION EXAMPLES End Point Implementation Examples

    Office of Environmental Management (EM)

    ... When the deactivated UO3 Facility no longer had accountable quantities of SNM, vital equipment, or classified information, DOE Order 5632.2A, Physical Protection of Special Nuclear ...

  8. Microsoft PowerPoint - 08 Lawrence 2010 DOE PM Workshop_EO 13514_03-01-10_presentation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Implementing Executive Order 13514 p g Federal Leadership in Environmental, Energy, and Economic Performance f At the Department of Energy Andrew Lawrence Office of Nuclear Safety, Quality y, Q y Assurance, and Environment 1 I. E.O. 13514: Goals Goals Requirements Deadlines Deadlines II. DOE's Implementation Strategy Governance Model Strategic Sustainability Performance Plan III. Meeting E.O. Goals C DOE S Current DOE Status Key issues for Project Managers 2 Overview "T t bli h i t t d t t

  9. DOE enforcement program roles and responsibilities: DOE handbook

    SciTech Connect (OSTI)

    1995-08-01

    The Price-Anderson Act provides indemnification to DOE contractors who manage and conduct nuclear activities in the DOE complex. The government acts as an insurer for these contractors against any findings of liability from the nuclear activities of the contractor within the scope of its contract. 10 CFR Part 820 establishes the legal framework for implementing DOE`s Nuclear Safety Enforcement Program. Integration with other DOE organizations and programs would assure that the enforcement process properly considers the actual or potential safety significance of a violation when determining an appropriate enforcement sanction. Achieving a proactive contractor compliance assurance rather than a heavy enforcement hand, will require a foundation of cooperation and teamwork across DOE organizations. This handbook identifies the areas of interface for the DOE Enforcement Program and provides guidance on roles and responsibilities for the key DOE organizational areas. It complements DOE-HDBK-1087-95 and 1089-95.

  10. Engineered Solutions: Order (2010-CE-2112)

    Broader source: Energy.gov [DOE]

    DOE issued an Order after entering into a Compromise Agreement with Engineered Solutions, Inc. to resolve a case involving the failure to certify dehumidifier basic model SD109.

  11. DOE Cooperative Research and Development Agreements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-11-06

    The order establishes policy, requirements, and responsibilities for the oversight, management, and administration of Cooperative Research and Development Agreement (CRADA) activities at DOE facilities. Supersedes DOE O 483.1 Admin Chg 1 and DOE M 483.1-1.

  12. DOE/LM-1469

    Office of Environmental Management (EM)

    DOE/LM-1469

  13. DOE-STD-1098-2008

    Broader source: Energy.gov [DOE]

    Radiological Control Replaced by DOE-STD-1098-2008 The Department of Energy (DOE) has developed this Standard to assist line managers in meeting their responsibilities for implementing occupational radiological control programs.

  14. Implementation of ORR Groundwater Strategy

    Office of Environmental Management (EM)

    OAK RIDGE RESERVATION GROUNDWATER STRATEGY STATUS Bill McMillan, Portfolio Federal Project Director Steve Cooke, DOE Project Manager Steve Haase, Ph.D., RSI Senior Geohydrologist June 10, 2015 www.energy.gov/EM 2 AGENDA: * Groundwater Strategy overview * Groundwater Strategy implementation status - Groundwater Program - Off-site Groundwater Assessment - ORR Regional flow model * Next priorities * Long-term implementation OAK RIDGE RESERVATION GROUNDWATER STRATEGY STATUS June 2015

  15. Extension of DOE O 430.2, In-House Energy Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-06-13

    The Order is in the process of being revised to implement E.O. 13123, Greening of the Government Through Efficient Energy Management, and a Secretarial Memorandum, Pollution Prevention and Energy Efficiency Leadership Goals. The revision will also include the acquisition, planning and management of utilities. Does not cancel other directives.

  16. DOE-HDBK-1211-2014

    Broader source: Energy.gov [DOE]

    Activity-Level Work Planning and Control Implementation This Handbook describes non-mandatory approaches for implementing Department of Energy (DOE) requirements for activity-level work planning and control (WP&C).

  17. IMPLEMENTING ARRANGEMENT

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    IMPLEMENTING ARRANGEMENT BETWEEN THE DEPARTMENT OF ENERGY OF THE UNITED STATES OF AMERICA AND THE MINISTRY OF ECONOMY, TRADE AND INDUSTRY OF JAPAN CONCERNING COOPERATION IN RESEARCH AND DEVELOPMENT IN ENERGY AND RELATED FIELDS The Department of Energy of the United States of America and the Ministry of Economy, Trade and Industry of Japan (hereinafter referred to as the "Participants"): Recognizing that energy security and climate change are among the most important issues to be solved

  18. DOE Seeks Reply Comments on Reducing Regulatory Burden | Department of

    Office of Environmental Management (EM)

    Energy Seeks Reply Comments on Reducing Regulatory Burden DOE Seeks Reply Comments on Reducing Regulatory Burden March 22, 2011 - 5:24pm Addthis The Department of Energy today announces the opening of the reply comment period for its Request for Information implementing Executive Order 13563, seeking public comment on how best to review its existing regulations and to identify whether any of its existing regulations should be modified, streamlined, expanded, or repealed. The Department is

  19. DOE-HDBK-1130-2008

    Broader source: Energy.gov [DOE]

    Radiological Worker (RW) Training Reaffirmed 2013 This program management guide provides guidance for proper implementation of additional standardized raining as outlined in the DOE Radiological Control Standard (RCS).

  20. Microsoft PowerPoint - Executive Order13423rbl | Department of Energy

    Office of Environmental Management (EM)

    Executive Order13423rbl Microsoft PowerPoint - Executive Order13423rbl PDF icon Microsoft PowerPoint - Executive Order13423rbl More Documents & Publications OPAM Policy Acquisition Guides Implementing Executive Order 13423 Executive Order 13423 Implementing Instructions

  1. DOE Fire Protection Handbook, Volume I

    SciTech Connect (OSTI)

    1996-08-01

    The Department of Energy (DOE) Fire Protection Program is delineated in a number of source documents including; the Code of Federal Regulations (CFR), DOE Policy Statements and Orders, DOE and national consensus standards (such as those promulgated by the National Fire Protection Association), and supplementary guidance, This Handbook is intended to bring together in one location as much of this material as possible to facilitate understanding and ease of use. The applicability of any of these directives to individual Maintenance and Operating Contractors or to given facilities and operations is governed by existing contracts. Questions regarding applicability should be directed to the DOE Authority Having Jurisdiction for fire safety. The information provided within includes copies of those DOE directives that are directly applicable to the implementation of a comprehensive fire protection program. They are delineated in the Table of Contents. The items marked with an asterisk (*) are included on the disks in WordPerfect 5.1 format, with the filename noted below. The items marked with double asterisks are provided as hard copies as well as on the disk. For those using MAC disks, the files are in Wordperfect 2.1 for MAC.

  2. YMGI: Order (2011-SCE-1605)

    Broader source: Energy.gov [DOE]

    DOE ordered YMGI Group LLC to pay a $31,400 civil penalty after finding (1) YMGI had failed to certify that certain models of residential central air conditioners comply with the applicable energy conservation standards and (2) YMGI had distributed in commerce model TTWC-18K-31B, a through-the-wall air conditioner that does not meet the applicable energy conservation standard.

  3. Self-assessment program implementation plan. Revision A

    SciTech Connect (OSTI)

    Quets, A.L.

    1991-10-23

    This implementation plan identifies and describes the tasks that must be completed in order to successfully implement a Self-Assessment (SA) Program. The purpose of the Self-Assessment Program is to comply with applicable Department of Energy (DOE) directives and orders, Federal, State, and local regulations, operate the Pinellas Plant according to best management practices, and achieve excellence in all operating areas. The Self-Assessment Program will be applied to the Pinellas Plant facility which includes buildings, grounds, equipment, operations, and activities under the control of line management. Furthermore, all applicable disciplines under environmental protection, safety, health and management will be covered by the program. The Self-Assessment Program has been designed to accomplish the following tasks: define the scope of the Self-Assessment Program; assign organizational roles and responsibilities; address EH and S functional elements and management issues; develop a Self-Assessment program charter and policy; identify all applicable EH and S codes, regulations and standards; develop self-assessment procedures and instructions; generate a Self-Assessment Manual; develop a master schedule for facility appraisals and audits; design checklists and report formats for recording appraisal data; implement an assessment tracking and reporting system; implement a root cause analysis and corrective action system; implement a trend analysis and lessons learned system; and establish a formal training program.

  4. DOE Emergency Public Affairs Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Headquarters Office of Public Affairs Emergency Public Affairs Plan The DOE HQ Office of Public Affairs Emergency Public Affairs Plan has been approved for implementation by: __________________________________________________________ Dan Leistikow, Director, HQ Office of Public Affairs Date: ______________ __________________________________________________________ Joseph Krol, Director, HQ Office of Emergency Management Date: ______________ DOE Office of Public Affairs Emergency Public Affairs

  5. Frequently Asked Questions | DOE PAGES

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Frequently Asked Questions Frequently Asked Questions I'm a researcher at a DOE national laboratory and have just had a manuscript accepted for publication in a peer-reviewed journal; what do I need to do in order to comply with DOE's public access requirements? I'm a researcher with a grant from DOE and have just had a manuscript accepted for publication in a peer-reviewed journal; what do I need to do in order to comply with DOE's public access requirements? What is DOE's Public Access

  6. DOE-STD-1075-94 | Department of Energy

    Energy Savers [EERE]

    5-94 DOE-STD-1075-94 November 22, 1995 Standard For Developing and Issuing DOE Safety Guides and Implementation Guides Canceled This standard establishes the style, format, content, and process for the preparing and issuing Department of Energy (DOE) guides. This standard is intended for use by all DOE components (including their contractors) when preparing, revising, commenting on, or issuing DOE guides. PDF icon Standard For Developing and Issuing DOE Safety Guides and Implementation Guides

  7. DOE standard: Radiological control

    SciTech Connect (OSTI)

    Not Available

    1999-07-01

    The Department of Energy (DOE) has developed this Standard to assist line managers in meeting their responsibilities for implementing occupational radiological control programs. DOE has established regulatory requirements for occupational radiation protection in Title 10 of the Code of Federal Regulations, Part 835 (10 CFR 835), ``Occupational Radiation Protection``. Failure to comply with these requirements may lead to appropriate enforcement actions as authorized under the Price Anderson Act Amendments (PAAA). While this Standard does not establish requirements, it does restate, paraphrase, or cite many (but not all) of the requirements of 10 CFR 835 and related documents (e.g., occupational safety and health, hazardous materials transportation, and environmental protection standards). Because of the wide range of activities undertaken by DOE and the varying requirements affecting these activities, DOE does not believe that it would be practical or useful to identify and reproduce the entire range of health and safety requirements in this Standard and therefore has not done so. In all cases, DOE cautions the user to review any underlying regulatory and contractual requirements and the primary guidance documents in their original context to ensure that the site program is adequate to ensure continuing compliance with the applicable requirements. To assist its operating entities in achieving and maintaining compliance with the requirements of 10 CFR 835, DOE has established its primary regulatory guidance in the DOE G 441.1 series of Guides. This Standard supplements the DOE G 441.1 series of Guides and serves as a secondary source of guidance for achieving compliance with 10 CFR 835.

  8. DOE-STD-1104 Acronyms

    Office of Environmental Management (EM)

    04 Master Acronyms List AU C.F.R. Code of Federal Regulations CSDR Conceptual Safety Design Report DBA Design Basis Accident DNFSB Defense Nuclear Facilities Safety Board DOE Department of Energy DOE-STD DOE Standard DSA Documented Safety Analysis EG Evaluation Guideline ESS Evaluation of the Safety of the Situation HC Hazard Category (e.g., HC-1, HC-2, HC-3) IP Implementation Plan JCO Justification for Continue Operations LCO Limiting Condition for Operation LCS Limiting Control Setting NSTP

  9. NEW - DOE O 227.1A, Independent Oversight Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The order prescribes the requirements and responsibilities for the DOE Independent Oversight Program.

  10. Recommendation 188: Long-Term Stewardship Implementation | Department of

    Energy Savers [EERE]

    Energy 88: Long-Term Stewardship Implementation Recommendation 188: Long-Term Stewardship Implementation ORSSAB offers Recommendations and Comments on the Long-Term Stewardship Implementation Plan for the DOE Oak Ridge. PDF icon Recommendation 188 PDF icon DOE response to recommendation 188 More Documents & Publications Recommendation 191: ETTP contract proposal review Recommendation 197: FY 2013 DOE Oak Ridge EM Budget Request Recommendation 182: Stewardship Workshop

  11. Creating a Climate for Successful Project Implementation

    Broader source: Energy.gov [DOE]

    This presentation acknowledges the difficulty implementing identified opportunities for energy efficiency in order to achieve savings and offers strategies to overcome that difficulty.

  12. Rocky Flats Environmental Technology Site Waste Compliance Order, August 21, 1997 Summary

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7-08-21-02 State Colorado Agreement Type Consent Order Legal Driver(s) RCRA Scope Summary Establish compliance requirements and schedules for the implementation of a "Waste Chemical Project Plan" Parties DOE; Kaiser-Hill Company, LLC; Colorado Department of Public Health and Environment Date 8/21/1997 SCOPE * Establish compliance requirements and schedules for the implementation of a "Waste Chemical Project Plan" (the "Waste Chemical Plan") at RFETS. * Resolve

  13. Midea: Order (2014-SW-20001)

    Broader source: Energy.gov [DOE]

    DOE ordered Hefei Rongshida Washing Equipment Manufacturing Co., Ltd. ("Hefei Rongshida"), a subsidiary of Midea Group, to pay a $64,780 civil penalty after finding Hefei Rongshida had manufactured and distributed in commerce in the U.S. 324 units of MAE80-S1702GPS, a noncompliant residential clothes washer.

  14. PQL: Order (2013-CE-27001)

    Broader source: Energy.gov [DOE]

    DOE ordered P.Q.L., Inc. to pay a $8,000 civil penalty after finding PQL had failed to certify that various basic models of medium base compact fluorescent lamps, general service fluorescent lamps, fluorescent lamp ballasts, and illuminated exit signs comply with the applicable energy conservation standards.

  15. Watermark: Order (2011-SW-2908)

    Broader source: Energy.gov [DOE]

    DOE ordered Watermark Designs, Ltd. to pay a $4,200 civil penalty after finding Watermark Designs, Ltd. had manufactured and distributed in commerce in the U.S. sixty-three units of basic model SH-FAL90, a noncompliant showerhead.

  16. Topaz: Order (2014-CE-35005)

    Broader source: Energy.gov [DOE]

    DOE ordered Topaz Lighting Corp. to pay a $8,000 civil penalty after finding Topaz had failed to certify that certain basic models of medium base compact fluorescent lamps, general service fluorescent lamps, and illuminated exit signs comply with the applicable energy conservation standards.

  17. Whirlpool: Order (2013-SE-1420)

    Broader source: Energy.gov [DOE]

    DOE ordered Whirlpool Corporation to pay a $5,329,800 civil penalty after finding Whirlpool had manufactured and distributed in commerce in the U.S. at least 26,649 units of basic model 8TAR81 noncompliant refrigerator-freezer.

  18. Kichler: Order (2014-CE-32007)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE ordered The L.D. Kichler Co. d/b/a Kichler Lighting to pay a $8,000 civil penalty after finding Kichler had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  19. Yosemite: Order (2014-CE-32015)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE ordered Northern Central Distributing, Inc. d/b/a Yosemite Home Décor to pay a $8,000 civil penalty after finding Yosemite had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  20. Midea: Order (2013-SE-1505)

    Broader source: Energy.gov [DOE]

    DOE ordered GD Midea Air-Conditioning Equipment Co. Ltd. to pay a $416,800 civil penalty after finding Midea had manufactured and distributed in commerce in the U.S. atleast 14,968 units of basic model MWJ1-08ERN1-BI8, a noncompliant room air conditioner.

  1. Versonel: Order (2014-CE-21009)

    Broader source: Energy.gov [DOE]

    DOE ordered Smart Surplus, Inc. d/b/a Versonel to pay a $8,000 civil penalty after finding Versonel had failed to certify that certain models of refrigerators and residential clothes dryers comply with the applicable energy conservation standards.

  2. Hicon: Order (2013-SE-1426)

    Broader source: Energy.gov [DOE]

    DOE ordered Ningbo Hicon International Industry Company, Ltd. to pay a $1,912,714 civil penalty after finding Hicon had manufactured and distributed in commerce in the U.S. 115,126 units of basic model BD-200, a noncompliant freezer.

  3. LG: Order (2014-SE-15011)

    Broader source: Energy.gov [DOE]

    DOE ordered LG Electronics USA, Inc. to pay a $1,479,860 civil penalty after finding LG had manufactured and distributed in commerce in the U.S. at least 7,438 units of basic model LT143CNR, a noncompliant room air conditioner.

  4. Universal: Order (2013-SE-26004)

    Broader source: Energy.gov [DOE]

    DOE ordered Universal Lighting Technologies, Inc. to pay a $7,264 civil penalty after finding Universal had manufactured and distributed in commerce in the U.S. 454 units of model B140R277HP, a noncompliant fluorescent lamp ballast.

  5. Philips: Order (2012-SE-2605)

    Broader source: Energy.gov [DOE]

    DOE ordered Philips Lighting Electronics N. A. to pay a $82,478 civil penalty after finding Philips had manufactured and distributed in commerce in the U.S. 7,498 units of basic model VEL-1S40-SC, noncompliant fluorescent lamp ballasts.

  6. Ambient Corporation's Reply comments to DOE RFI: Addressing Policy and

    Energy Savers [EERE]

    Logistical Challenges to Smart Grid Implementation | Department of Energy Ambient Corporation's Reply comments to DOE RFI: Addressing Policy and Logistical Challenges to Smart Grid Implementation Ambient Corporation's Reply comments to DOE RFI: Addressing Policy and Logistical Challenges to Smart Grid Implementation Ambient Corporation submits the following comments to the US Department of Energy (DOE) in hopes that their contribution can highlight and further the understanding of the DOE on

  7. DOE Procurement Community Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operational Management » Procurement and Acquisition » DOE Procurement Community Resources DOE Procurement Community Resources Acquisition Federal Acquisition Regulation (FAR) DOE Acquisition Regulation (DEAR) Acquisition Letters Acquisition Guide Policy Flashes DOE Acquisition System: A Guide for Executives Acquisition Career Management Order Handbook Contract Human Resource Management Cost Study Manual & Value Study Desk Manual Small Business FY15 DOE Final Goal Letter - DOE-SBA MOU

  8. NAP Coalition Response to DOE RFI: Addressing Policy and Logistical

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Challenges to Smart Grid Implementation | Department of Energy NAP Coalition Response to DOE RFI: Addressing Policy and Logistical Challenges to Smart Grid Implementation NAP Coalition Response to DOE RFI: Addressing Policy and Logistical Challenges to Smart Grid Implementation The NAP Coalition is a "Coalition of Coalitions" that has been formed for the purpose of implementing the National Action Plan released by FERC in cooperation with DOE in June of 2010. Organizations working

  9. DRAFT - DOE O 452.2C, Security and Use Control of Nuclear Explosives and Nuclear Weapons

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The Order establishes requirements to implement the nuclear explosive security and use control (UC) elements of DOE O 452.1D, Nuclear Explosive and Weapon Surety (NEWS) Program, to ensure authorized use, when directed by proper authority, and protect against deliberate unauthorized acts (DUAs), deliberate unauthorized use (DUU), and denial of authorized use (DAU).

  10. Worker Protection Program for DOE (including the National Nuclear Security Administration) Federal Employees Guide for Use with DOE O 440.1B

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-06-04

    The Guide provides suggestions and alternative approaches that DOE elements may consider in implementing their worker protection program. Cancels DOE G 440.1-1.

  11. Advanced Topics for the Portfolio Manager Initiative: Energy Disclosure Policy Implementation

    Broader source: Energy.gov [DOE]

    This presentation, given through the DOE's Technical Assitance Program (TAP), provides information on the Energy Disclosure Policy Implementation

  12. DOE-STD-1158-2002

    Broader source: Energy.gov [DOE]

    Self-Assessment Standard for DOE Contractor Criticality Safety Programs Replaced by DOE-STD-1158-2010 This document encompasses all elements of the Contractor criticality safety program at DOE facilities. The effectiveness of the criticality safety program is dependent upon management implementing its roles and responsibilities to integrate criticality safety into work practices. This doc is an assessment tool.

  13. Microsoft Word - Final Agreement to Implement 6 30 08 clean draft.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Agreement to Implement - Page - 1 - AGREEMENT TO IMPLEMENT U.S. DISTRICT COURT ORDER DATED MAY 25, 2006 The Parties to this Agreement are the United States Department of Energy ("DOE"), the United States Navy, Naval Nuclear Propulsion Program ("Navy") 1 and the State of Idaho (by and through the Governor of the State of Idaho, C.L. "Butch" Otter, and the Idaho Attorney General, Lawrence G. Wasden) and the Governor of the State of Idaho, C.L. "Butch" Otter,

  14. DOE F

    Office of Environmental Management (EM)

    242.1 (12-2014) U.S. DEPARTMENT OF ENERGY Forms Manager Designation SECTION I. Designation Information Pursuant to DOE Guide 242.1-1, Forms Management Guide, (Name) _______________________________________________ is hereby designated a Forms Manager for (DOE Organization/Contractor Activity) ____________________________________________________________________. The incumbent's responsibilities include providing guidance and assisting within their respective organizations, supporting applicable

  15. Preparing for Project Implementation Financing Project Implementation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 11, 2010 9 - Preparing for Project Implementation Financing Project Implementation Save Energy Now LEADER Web Conference Project Implementation Seminar Series Save Energy Now LEADER Web Conference Agenda  Seminar Series Overview  Recap Seminar # 8 - "Announcing the PRIZE"  Financing Project Implementation Fred Schoeneborn - ORNL team Robert Varcoe - UAW & General Motors  Questions/Future Seminars Save Energy Now LEADER Web Conference Project Implementation Series

  16. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  17. Step 4: Project Implementation

    Energy Savers [EERE]

    Process Step 4: Project Implementation Presentation Agenda * Step 4: Project Implementation - Pre-construction - Contract execution - Interconnection - Project construction - Commissioning * Project Example 2 1/28/2016 2 1 Potential 3 Refinement 5 Operations & Maintenance 2 Options 4 Implementation 4 Implementation 3 Potential Options Refinement Implementation Operations & Maintenance Step 4: Implementation 4 Purpose: Contract and begin physical construction of project Tasks: * Finalize

  18. DOE Labor Relations Training and Information Session, November...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Training and Information Session Agenda PDF icon DOE Secretarial Policy on Contractor Pension Plan Participation (101515) PDF icon DOE Order 350.1, Chapter 5 Benefits PDF icon...

  19. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-06-01

    To define the program for the management of cost-effective maintenance of Department of Energy (DOE) nuclear facilities. Guidance for compliance with this Order is contained in DOE G 433.1-1, Nuclear Facility Maintenance Management Program Guide for use with DOE O 433.1, which references Federal regulations, DOE directives, and industry best practices using a graded approach to clarify requirements and guidance for maintaining DOE-owned Government property. (Cancels DOE 4330.4B, Chapter II, Maintenance Management Program, dated 2-10-94.) Cancels DOE 4330.4B (in part). Canceled by DOE O 433.1A.

  20. LG: Order (2015-CE-14022) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    LG: Order (2015-CE-14022) LG: Order (2015-CE-14022) February 11, 2015 DOE ordered LG Electronics USA, Inc. to pay a 8,000 civil penalty after finding LG had failed to certify that ...

  1. Systemair: Order (2016-CE-43003) | Department of Energy

    Energy Savers [EERE]

    Systemair: Order (2016-CE-43003) Systemair: Order (2016-CE-43003) February 23, 2016 DOE ordered Systemair, Inc., to pay a $8,000 civil penalty after finding Systemair had failed to certify that its single package vertical air conditioning and heating equipment comply with the applicable energy conservation standards. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Systemair. DOE regulations require a manufacturer (which includes importers) to submit

  2. Fujitsu: Order (2015-CE-16014) | Department of Energy

    Office of Environmental Management (EM)

    Fujitsu: Order (2015-CE-16014) Fujitsu: Order (2015-CE-16014) October 27, 2015 DOE ordered Fujitsu General America, Inc. to pay a $8,000 civil penalty after finding Fujitsu had failed to certify that certain models of central air conditioners and heat pumps comply with the applicable energy conservation standards prior to distributing them in commerce. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Fujitsu. DOE regulations require a manufacturer (which

  3. Lochinvar: Order (2016-CE-24001) | Department of Energy

    Office of Environmental Management (EM)

    Lochinvar: Order (2016-CE-24001) Lochinvar: Order (2016-CE-24001) November 2, 2015 DOE ordered Lochinvar, LLC, to pay a $8,000 civil penalty after finding Lochinvar had failed to certify that certain models of pool heaters comply with the applicable energy conservation standard. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Lochinvar. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have

  4. DOE NEPA Rulemaking | Department of Energy

    Energy Savers [EERE]

    DOE NEPA Rulemaking DOE NEPA Rulemaking Revisions to U.S. Department of Energy (DOE) regulations regarding implementation of the National Environmental Policy Act (NEPA) became effective on November 14, 2011. DOE has established 20 new categorical exclusions, most of which include criteria (e.g., acreage, location, and height limitations) that limit the covered actions. These categorical exclusions address actions such as stormwater runoff control, alternative fuel vehicle fueling stations and

  5. Proceedings of the DOE standards managers workshop, Gaithersburg, Maryland, October 26--28, 1992

    SciTech Connect (OSTI)

    Not Available

    1992-12-31

    On May 19, 1992, the Secretary of Energy signed the revised DOE Order 1300.2A, Department of Energy Technical Standards Program, which set the policy and assigned responsibility for activities within the program. The purpose of the revision to the order was to place greater emphasis on the use of technical standards for design, construction, testing, modification, operation, decommissioning, decontamination, and remediation of DOE`s facilities and activities. Within the context of this order, Standards Managers have been assigned for each DOE Secretarial office, each DOE Field Office, and each management and operating (M&O) contractor or site manager to be responsible for and provide the appropriate amount of emphasis on consistent use of standards at DOE facilities. Office of Management and Budget (OMB) Circular A-119 also stresses the importance of the use of standards within Government facilities and directs that activities first attempt to locate and adopt non-Government standards (NGSs) for DOE use. If an NGS is not complete enough for the intended application, it should be adopted for the activity and tailored for the need by development of a Government (DOE) standard. When these NGS documents are unavailable, DOE components will develop an appropriate Government standard to satisfy the need. This expanded DOE program will provide all the information necessary to adopt, tailor, or develop these standards and track the activities. A key to the proper implementation of technical standards and governing requirements is establishing a culture of knowledge and commitment. The workshop provided an in-depth orientation on the Technical Standards Program to participating DOE and M&O Standards Managers.

  6. PQL: Order (2013-CE-27001) | Department of Energy

    Energy Savers [EERE]

    Order (2013-CE-27001) PQL: Order (2013-CE-27001) August 7, 2015 DOE ordered P.Q.L, Inc. to pay a $12,500 civil penalty after finding PQL had failed to certify that certain models of medium base compact fluorescent lamps comply with the applicable energy conservation standards. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and PQL. PDF icon PQL: Order (2013-CE-27001) More Documents & Publications PQL: Proposed Penalty (2013-CE-27001) PQL: Order

  7. Perlick: Order (2013-SE-14001) | Department of Energy

    Energy Savers [EERE]

    Order (2013-SE-14001) Perlick: Order (2013-SE-14001) May 14, 2015 DOE ordered Perlick Corporation to pay a $168,200 civil penalty after finding Perlick had manufactured and distributed in commerce in the U.S. 841 units of basic model HP24F, a noncompliant freezer. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Perlick. PDF icon Perlick: Order (2013-SE-14001) More Documents & Publications Perlick: Proposed Penalty (2013-SE-14001) Perlick: Order

  8. Danco: Order (2015-CW-28006) | Department of Energy

    Office of Environmental Management (EM)

    Order (2015-CW-28006) Danco: Order (2015-CW-28006) July 7, 2015 DOE ordered Danco, Inc. to pay a $8,000 civil penalty after finding Danco had failed to certify that certain models of faucets comply with the applicable water conservation standards. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Danco. PDF icon Danco: Order (2015-CW-28006) More Documents & Publications Danco: Proposed Penalty (2015-CW-28006) Fagor America: Order (2014-CE-23018) MC

  9. Jamison Door: Order (2013-CE-5348)

    Broader source: Energy.gov [DOE]

    DOE ordered Jamison Door Company to pay a $6,000 civil penalty after finding Jamison Door had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  10. Goodman Manufacturing: Order (2012-CE-1509)

    Broader source: Energy.gov [DOE]

    DOE ordered Goodman Manufacturing Company L.P. to pay an $8,000 civil penalty after finding Goodman Manufacturing had failed to certify that certain room air conditioners comply with the applicable energy conservation standard.

  11. Manitowoc Foodservice: Order (2012-CE-5309)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE ordered Manitowoc Foodservice to pay an $6,000 civil penalty after finding Manitowoc Foodservice had failed to certify that Manitowoc walk-in coolers and freezers (WICFs) and their components comply with the applicable energy conservation standard.

  12. Golden Cooler: Order (2013-CE-5345)

    Broader source: Energy.gov [DOE]

    DOE ordered Golden Cooler to pay a $8,000 civil penalty after finding Golden Cooler had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  13. Prizer-Painter: Order (2014-CE-23005)

    Broader source: Energy.gov [DOE]

    DOE ordered Prizer-Painter Stove Works, Inc. to pay a $8,000 civil penalty after finding Prizer-Painter had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  14. Engineered Products: Order (2012-SE-5401)

    Broader source: Energy.gov [DOE]

    DOE ordered Engineered Products Company to pay a $480 civil penalty after finding EPCO had manufactured/privately labeled and distributed in commerce in the U.S. 19 units of basic model 15701, a metal halide lamp fixture.

  15. Peerless-Premier: Order (2014-CE-23007)

    Broader source: Energy.gov [DOE]

    DOE ordered Peerless-Premier Appliance Co. to pay a $8,000 civil penalty after finding Peerless-Premier had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  16. Dade Engineering: Order (2013-CE-5316)

    Broader source: Energy.gov [DOE]

    DOE ordered Dade Engineering Corp. to pay a $8,000 civil penalty after finding Dade Engineering had failed to certify that certain models of walk-in cooler and freezer (WICF) components comply with the applicable energy conservation standards.

  17. Southeast Cooler: Order (2013-CE-5331)

    Broader source: Energy.gov [DOE]

    DOE ordered Southeast Cooler Corp. to pay a $8,000 civil penalty after finding Southeast Cooler had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  18. Allen Co: Order (2010-CW-0715)

    Broader source: Energy.gov [DOE]

    DOE ordered Allen Co. to pay a $5,000 civil penalty after finding Allen Co. had failed to certify that certain models of faucets comply with the applicable water conservation standards.

  19. Home Depot: Order (2014-CE-32017)

    Broader source: Energy.gov [DOE]

    DOE ordered The Home Depot, Inc. to pay a $8,000 civil penalty after finding Home Depot had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  20. Mackle Company: Order (2010-SE-0106)

    Broader source: Energy.gov [DOE]

    DOE ordered Mackle Company, Inc. to pay a $27,200 civil penalty after finding the company had failed to certify that a variety of refrigerators, refrigerator-freezers, and freezers comply with the applicable energy conservation standards.

  1. Mackle Company: Order (2011-CE-2102)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE ordered The Mackle Company, Inc., to pay a $6,000 civil penalty after finding Mackle Co. had failed to certify that basic model D110, a clothes dryer, complies with the applicable energy conservation standards.

  2. Elmira Stove Works: Order (2011-CE-1407)

    Broader source: Energy.gov [DOE]

    DOE ordered Elmira Stove Works to pay a $6,000 civil penalty after finding Elmira Stove Works had failed to certify that certain models of refrigerator-freezers comply with the applicable energy conservation standard.

  3. ET Industries: Order (2012-SE-2902)

    Broader source: Energy.gov [DOE]

    DOE ordered ET Industries, Inc. to pay a $39,000 civil penalty after finding ET Industries had manufactured and distributed in commerce in the U.S. 974 units of basic model TH-1, a noncompliant showerhead.

  4. Polar King: Order (2013-CE-5328)

    Broader source: Energy.gov [DOE]

    DOE ordered Polar King International Inc. to pay a $8,000 civil penalty after finding Polar King had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  5. Hunter Fan: Order (2014-CE-32008)

    Broader source: Energy.gov [DOE]

    DOE ordered Hunter Fan Company to pay a $8,000 civil penalty after finding Hunter Fan had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  6. Euro Chef USA: Order (2014-CE-23004)

    Broader source: Energy.gov [DOE]

    DOE ordered Euro Chef USA Inc. to pay a $8,000 civil penalty after finding Euro Chef USA had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  7. Hudson Reed: Order (2011-SW-2909)

    Broader source: Energy.gov [DOE]

    DOE ordered Hudson Reed, Ltd. to pay a $3,000 civil penalty after finding Hudson Reed had manufactured and distributed in commerce in the U.S. 18 units of basic model HEAD16, a noncompliant showerhead.

  8. Imperial Manufacturing: Order (2013-CE-5322)

    Broader source: Energy.gov [DOE]

    DOE ordered Imperial Manufacturing, Inc. to pay a $8,000 civil penalty after finding Imperial Manufacturing had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  9. Royal Centurion: Order (2012-CE-3608)

    Broader source: Energy.gov [DOE]

    DOE ordered Royal Centurion, Inc., to pay a $8,000 civil penalty after finding Royal Centurion had failed to certify that certain models of dehumidifiers comply with the applicable energy conservation standards.

  10. AM Conservation: Order (2010-CW-1415)

    Broader source: Energy.gov [DOE]

    DOE ordered AM Conservation Group, Inc. to pay a $5,000 civil penalty after finding AM Conservation had failed to certify that certain models of showerheads comply with the applicable water conservation standards.

  11. USA Manufacturing: Order (2013-CE-5336)

    Broader source: Energy.gov [DOE]

    DOE ordered USA Manufacturing to pay a $8,000 civil penalty after finding USA Manufacturing had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  12. Task Order Awarded for Environmental Technical Services

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today awarded a task order for environmental technical services to Professional Project Services, Inc., of Oak Ridge, TN, for support services at the Paducah Gaseous Diffusion Plant located near Paducah, KY.

  13. Paragon Sales: Order (2012-CE-1417)

    Broader source: Energy.gov [DOE]

    DOE ordered Paragon Sales Co., Inc., to pay a $6,000 civil penalty after finding Paragon Sales had failed to certify that certain models of Liebherr residential freezers comply with the applicable energy conservation standards.

  14. MC Appliance: Order (2014-CE-20002)

    Broader source: Energy.gov [DOE]

    DOE ordered MC Appliance Corporation to pay a $16,000 civil penalty after finding MC Appliance had failed to certify that certain models of residential clothes washers and residential clothes dryers comply with the applicable energy conservation standards.

  15. Minka-Aire: Order (2014-CE-32018)

    Broader source: Energy.gov [DOE]

    DOE ordered Minka Lighting Inc. to pay a $8,000 civil penalty after finding Minka had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  16. Custom Coolers: Order (2013-CE-5315)

    Broader source: Energy.gov [DOE]

    DOE ordered Custom Coolers, LLC to pay a $8,000 civil penalty after finding Custom Coolers had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  17. Viking Range: Order (2014-CE-23014)

    Broader source: Energy.gov [DOE]

    DOE ordered Viking Range, LLC to pay a $8,000 civil penalty after finding Viking Range had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  18. American Range: Order (2014-CE-23006)

    Broader source: Energy.gov [DOE]

    DOE ordered American Range Corporation to pay a $8,000 civil penalty after finding American Range had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  19. Barclay Products: Order (2013-CW-3005)

    Broader source: Energy.gov [DOE]

    DOE ordered Barclay Products, Ltd. to pay a $8,000 civil penalty after finding Barclay Products had failed to certify that certain models of water closets comply with the applicable water conservation standards.

  20. Ramblewood Green: Order (2014-CE-23017)

    Broader source: Energy.gov [DOE]

    DOE ordered Ramblewood Green Ltd. to pay a $8,000 civil penalty after finding Ramblewood Green had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.