  1. UMTRA project technical assistance contractor quality assurance implementation plan

    SciTech Connect (OSTI)

    Not Available

    1994-03-01T23:59:59.000Z

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center.

  2. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water, Revision 2

    SciTech Connect (OSTI)

    NONE

    1995-11-01T23:59:59.000Z

    This document contains the Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The QAIP outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QA program is designed to use monitoring, audit, and surveillance activities as management tools to ensure that UMTRA Project activities are carried out in amanner to protect public health and safety, promote the success of the UMTRA Project, and meet or exceed contract requirements.

  3. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water

    SciTech Connect (OSTI)

    Not Available

    1994-09-01T23:59:59.000Z

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP). The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. The QAIP is authorized and approved by the TAC Project Manager and QA manager. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization activities are carried out in a manner that will protect public health and safety, promote the success of the UMTRA Project and meet or exceed contract requirements.

  4. ESPC ENABLE Project Assistance and Training

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program (FEMP) offers project assistance and training to help Federal agencies implement Energy Savings Performance Contracts (ESPC) ENABLE projects.

  5. Renewable Energy Project Assistance | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    The Federal Energy Management Program (FEMP) provides renewable energy project assistance to help Federal agencies identify and implement renewable energy technologies into...

  6. Renewable Energy Project Assistance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assistance Renewable Energy Project Assistance The Federal Energy Management Program (FEMP) provides renewable energy project assistance to help Federal agencies identify and...

  7. Rural Enterprise Assistance Project's Loan Program (Nebraska)

    Broader source: Energy.gov [DOE]

    The Rural Enterprise Assistance Project (REAP) offers four services: financing (micro loans), business training, technical assistance, and networking. REAP's Loan Program focuses on providing...

  8. START Renewable Energy Project Development Assistance | Department...

    Energy Savers [EERE]

    START Renewable Energy Project Development Assistance START Renewable Energy Project Development Assistance May 1, 2015 11:59PM EDT U.S. Department of Energy The U.S. Department of...

  9. Graduate Assistant Stipend Enhancement Project Proposal Type

    E-Print Network [OSTI]

    Karonis, Nicholas T.

    1 Graduate Assistant Stipend Enhancement Project Proposal Type The Graduate Assistant Stipend Strategic Plan. Goals The Graduate Assistant Stipend Enhancement project consists of two programs: the Great. Fundamentally, the project seeks to increase the number of graduate students who receive assistantships

  10. START Renewable Energy Project Development Assistance

    Broader source: Energy.gov [DOE]

    The DOE Office of Indian Energy is now accepting applications for the third round of the Strategic Technical Assistance Response Team (START) Renewable Energy Project Development Assistance Program to provide Tribes with technical assistance with furthering the development of community- and commercial-scale renewable energy projects. Applications are due May 1, 2015, and up to five projects will be selected in June 2015.

  11. Step 4: Project Implementation

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently AskedEnergyIssues DOE's NuclearSpurringSteam Systems Steam Systems4: Project

  12. START Program for Renewable Energy Project Development Assistance...

    Broader source: Energy.gov (indexed) [DOE]

    Program for Renewable Energy Project Development Assistance START Program for Renewable Energy Project Development Assistance The Strategic Technical Assistance Response Team...

  13. Federal Sector Renewable Energy Project Implementation: ""What...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Sector Renewable Energy Project Implementation: ""What's Working and Why Federal Sector Renewable Energy Project Implementation: ""What's Working and Why Presentation by...

  14. Renewable Energy Project Planning and Implementation | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Planning and Implementation Renewable Energy Project Planning and Implementation Federal renewable energy projects can be large or small and managed by a third-party or the agency....

  15. Preparing for Project Implementation Assigning Accountability...

    Broader source: Energy.gov (indexed) [DOE]

    Assigning Accountability for Each Project (April 14, 2010) More Documents & Publications Preparing for Project Implementation after an Energy Assessment...

  16. Implementing Fast Hierarchical Back Projection Jason Chang

    E-Print Network [OSTI]

    Willsky, Alan S.

    Implementing Fast Hierarchical Back Projection Jason Chang ECE 558 ­ Final Project Paper May 9, 2007 #12;Implementing Fast Hierarchical Back Projection Chang ii Abstract ­ Filtered back projection implemented in this project, called fast hierarchical back projection (FHBP), was proposed in [1] as a fast

  17. START Program for Renewable Energy Project Development Assistance...

    Energy Savers [EERE]

    Program for Renewable Energy Project Development Assistance - Round Three Application START Program for Renewable Energy Project Development Assistance - Round Three Application...

  18. START Program for Renewable Energy Project Development Assistance...

    Office of Environmental Management (EM)

    Program for Renewable Energy Project Development Assistance Non-Disclosure Agreement START Program for Renewable Energy Project Development Assistance Non-Disclosure Agreement...

  19. Renewable Energy Project Development Assistance (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2013-07-01T23:59:59.000Z

    This fact sheet provides information on the Tribes selected to receive assistance from the U.S. Department of Energy Office of Indian Energy 2013 Strategic Technical Assistance Response Team (START) Program, which provides technical expertise to support the development of next-generation energy projects on tribal lands.

  20. Sandia National Laboratories: implement energy storage projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    implement energy storage projects Sandian Spoke at the New York Energy Storage Expo On December 12, 2014, in Energy, Energy Storage, Energy Storage Systems, Grid Integration,...

  1. An integrated teamwork approach to regional FEMP project implementation

    SciTech Connect (OSTI)

    Jhaveri, A.

    1996-05-01T23:59:59.000Z

    With the establishment of Regional Energy Action Project (REAP) teams in Seattle, Chicago, and New York earlier this year, the U.S. Department of Energy`s Federal Energy Management Program (FEMP) has taken a quantum leap towards assisting Federal agencies meet the minimum 30% energy savings goal, through the year 2005 from the baseline year of 1985, per the Executive Order No. 12902. The three (3) member team, including the FEMP liaison, at these three (3) Support Offices, has significantly increased the manpower resources and expertise needed to implement FEMP projects through technical, financial, marketing, procurement, and contracting assistance in each region, thus complementing the limited resources of the participating Federal agencies. The potential and opportunities available in the four-state Region 10 (Washington, Oregon, Idaho, Alaska) for aggressively promoting FEMP projects are significant as demonstrated by some 20 completed SAVEnergy Action Plan Audits and as many as 10 energy efficiency projects with innovative financing arrangements, including but not limited to, agency appropriations, utility Demand Side Management (DSM), Energy Savings Performance Contract (ESPC) and third party financing handled by Energy Service Companies (ESCO`s), and/or combinations of these. This presentation will highlight some of the specific FEMP projects including partnership development, negotiations, coordination, and technical support models used to assist the selected Federal agency.

  2. Tribal Renewable Energy Webinar on Project Implementation and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Renewable Energy Webinar on Project Implementation and Operations & Maintenance on Aug. 8 Tribal Renewable Energy Webinar on Project Implementation and Operations & Maintenance on...

  3. Developments in Assisting Countries in Implementing the IAEA Additional Protocol

    SciTech Connect (OSTI)

    Killinger, Mark H.; Hansen, Linda H.; Cain, Ronald A.; Kovacic, Don N.; Apt, Kenneth E.; VanSickle, Matthew

    2010-08-11T23:59:59.000Z

    In 2008, the U.S. Department of Energy (DOE) began assisting selected non-nuclear weapon states in planning and preparing for implementation of the International Atomic Energy Agencys Additional Protocol (AP). Since then, the AP international implementation program has contributed to the substantial progress made by Vietnam, Thailand, Iraq, and Malaysia in preparing for entry-into-force of the AP. An overall engagement plan has been developed with components designed to train government AP implementing agencies, inform policy makers, conduct outreach to industry and universities, make AP reporting software available and useful, and plan a detailed approach for implementing the declaration and complementary access provisions of the AP. DOE recently began collaborating with Indonesia, which has already entered the AP into force, requiring a second method of engagement somewhat different from that taken with countries that have not entered the AP into force. The AP international implementation program, administered by the International Nuclear Safeguards and Engagement Program, is working more closely with DOEs International Nonproliferation Export Control Program to ensure countries are aware of and prepared to implement the export/import provisions of the AP. As the AP implementation program matures and helps move countries closer to entry-into-force or improved AP implementation, it is identifying characteristics of a countrys end-state that indicate that DOE assistance is no longer required. The U.S. AP Implementation Act and Senate Resolution of Ratification require the Administration to report annually to Congress on measures taken to achieve the adoption of the AP in non-nuclear weapon states. DOEs AP international implementation program is a significant part of these measures. This paper describes recent developments to increase the scope and effectiveness of the program.

  4. The institutional needs of joint implementation projects

    SciTech Connect (OSTI)

    Watt, E.; Sathaye, J. [Lawrence Berkeley Lab., CA (United States); Buen, O. de; Masera, O. [National Univ. of Mexico, Mexico City (Mexico); Gelil, I.A. [Organization of Energy Conservation and Planning, Cairo (Egypt); Ravindranath, N.H. [Indian Inst. of Science, Bangalore (India); Zhou, D.; Li, J. [Energy Research Inst., Beijing (China); Intarapravich, D. [Thailand Environmental Inst., Bangkok (Thailand)

    1995-10-21T23:59:59.000Z

    In this paper, the authors discuss options for developing institutions for joint implementation (JI) projects. They focus on the tasks which are unique to JI projects or require additional institutional needs--accepting the project by the host and investor countries and assessing the project`s greenhouse gas (GHG) emission reduction or sequestration--and they suggest the types of institutions that would enhance their performance. The evaluation is based on four sets of governmental and international criteria for JI projects, the experiences of ten pilot JI projects, and the perspectives of seven collaborating authors from China, Egypt, India, Mexico, and Thailand, who interviewed relevant government and non-government staff involved in JI issue assessment in their countries. After examining the roles for potential JI institutions, they present early findings arguing for a decentralized national JI structure, which includes: (1) national governmental panels providing host country acceptance of proposed JI projects; (2) project parties providing the assessment data on the GHG reduction or sequestration for the projects; (3) technical experts calculating these GHG flows; (4) certified verification teams checking the GHG calculations; and (5) members of an international JI Secretariat training and certifying the assessors, as well as resolving challenges to the verifications. 86 refs.

  5. Baltimore residential assistance demonstration project: Final report

    SciTech Connect (OSTI)

    NONE

    1998-09-01T23:59:59.000Z

    At the request of the City of Baltimore for assistance in developing the Global Action Plan (GAP) EcoTeam Program, DOE Office of Energy Efficiency and Renewable Energy provided GAP with $10,000 for a one-year demonstration project. The results of this action are as follows: four EcoTeams were established representing 28 households and 47 people; the self reported resource savings to date per household are on average: energy savings--9%, auto emission reduction--16%, solid waste reduction--52%, water savings--25%, dollar savings--$174; the initial seed team (prior to this funding) replicated and started 2 new teams, one of those teams replicated and started 2 more teams, the other team did not replicate; 4 volunteer coaches were recruited to coach each of these teams; a volunteer coordinator was recruited to provide local guidance for this demonstration project and help GAP reach out to the Fairfield low-income neighborhood, the volunteer coordinator was unable to establish any EcoTeams in this neighborhood as their priorities were establishing a neighborhood action team and addressing immediate health-related environmental issues; the volunteers have communicated information about this demonstration project among many community and Baltimore government leaders to solicit support for a full campaign and to assess the level of that support.

  6. assistance quarterly project: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    We propose such as the ability to view flow fields and manipulate time-scales. The end result of this project will be studentsProject Team German Drazer, Assistant...

  7. Microsoft Word - START Renewable Energy Project Development Assistance...

    Energy Savers [EERE]

    part of the DOE Office of Indian Energy's effort to assist in the development of tribal renewable energy projects. The START team is comprised of DOE and national laboratory...

  8. START Program for Renewable Energy Project Development Assistance Round Three Application

    Broader source: Energy.gov [DOE]

    Download the application for the START Program for Renewable Energy Project Development AssistanceRound Three.

  9. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance U.S. Army Project 181 Implementation Challenges in Deployment of an Energy Security Microgrid for Army Reserve Facilities located on the Former Fort Devens Army Base

    SciTech Connect (OSTI)

    Warwick, William M.

    2010-09-30T23:59:59.000Z

    This documents reports on a request for technical assistance from Fort Devens to analyze procurement of energy from nearby renewable generating resources.

  10. Methodological analysis of process technology in Engineering projects implementation

    E-Print Network [OSTI]

    Heineck, Fabio L. (Fabio Luis)

    2007-01-01T23:59:59.000Z

    This thesis will evaluate the utilization of process management tools in the implementation of a major engineering project in a steel plant of Gerdau Group in the city of Charqueadas, Brazil. The project consisted of an ...

  11. Integrated Project Team Guide for Formation and Implementation

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-02-03T23:59:59.000Z

    The guide provides detailed guidance of the preferred processes to form and implement an Integrated Project Team (IPT) in support of proper project execution as prescribed in DOE O 413.3B.

  12. Informed Consent to Get Projects Implemented

    E-Print Network [OSTI]

    Minnesota, University of

    ;North Urban Regional Trail #12;Using Technology Mobile GPS/GIS Driver Sight Line Rendering #12;Before? How? #12;Tools to Assist GPS/GIS Technology Graphics and Video Simulations Audience Polling

  13. Federal ESPC Process Phase 4: Project Implementation and Construction

    Broader source: Energy.gov [DOE]

    Phase 4 of the energy savings performance contract (ESPC) process focuses on project implementation and construction. At this point, an ESPC project is much like any other construction project. In fact, the U.S. Department of Energys (DOE) indefinite-delivery, indefinite-quantity (IDIQ) ESPC contains the Federal Acquisition Regulations (FAR) clauses that normally appear in any government construction project.

  14. Program assists steam drive design project

    SciTech Connect (OSTI)

    Mendez, A.A.

    1984-08-27T23:59:59.000Z

    A new program for the HP-41CV programmable calculator will compute all parameters required for a steam drive project design. The Marx and Langenheim model assumptions are used to solve a more advanced version of the Myhill and Stegemeier model. Also, the Mandl and Volek model assuptions are used to compute the size of the steam zone.

  15. Renewable Energy Project Planning and Implementation | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Federal renewable energy projects can be large or small and managed by a third-party or the agency. Typically, large-scale projects-larger than 10 megawatts (MWs)-are financed,...

  16. DOE Financial Assistance Awards: Active Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: Theof"Wave theJulyD&D Project|Statement |3250.1DOE Federal

  17. Hydrogen-Assisted IC Engine Combustion as a Route to Hydrogen Implementation

    SciTech Connect (OSTI)

    Andre Boehman; Daniel Haworth

    2008-09-30T23:59:59.000Z

    The 'Freedom Car' Initiative announced by the Bush Administration has placed a significant emphasis on development of a hydrogen economy in the United States. While the hydrogen-fueled fuel-cell vehicle that is the focus of the 'Freedom Car' program would rely on electrochemical energy conversion, and despite the large amount of resources being devoted to its objectives, near-term implementation of hydrogen in the transportation sector is not likely to arise from fuel cell cars. Instead, fuel blending and ''hydrogen-assisted'' combustion are more realizable pathways for wide-scale hydrogen utilization within the next ten years. Thus, a large potential avenue for utilization of hydrogen in transportation applications is through blending with natural gas, since there is an existing market for natural-gas vehicles of various classes, and since hydrogen can provide a means of achieving even stricter emissions standards. Another potential avenue is through use of hydrogen to 'assist' diesel combustion to permit alternate combustion strategies that can achieve lower emissions and higher efficiency. This project focused on developing the underlying fundamental information to support technologies that will facilitate the introduction of coal-derived hydrogen into the market. Two paths were envisioned for hydrogen utilization in transportation applications. One is for hydrogen to be mixed with other fuels, specifically natural gas, to enhance performance in existing natural gas-fueled vehicles (e.g., transit buses) and provide a practical and marketable avenue to begin using hydrogen in the field. A second is to use hydrogen to enable alternative combustion modes in existing diesel engines, such as homogeneous charge compression ignition, to permit enhanced efficiency and reduced emissions. Thus, this project on hydrogen-assisted combustion encompassed two major objectives: (1) Optimization of hydrogen-natural gas mixture composition and utilization through laboratory studies of spark-ignition engine operation on H{sub 2}-NG and numerical simulation of the impact of hydrogen blending on the physical and chemical processes within the engine; and (2) Examination of hydrogen-assisted combustion in advanced compression-ignition engine processes. To that end, numerical capabilities were applied to the study of hydrogen assisted combustion and experimental facilities were developed to achieve the project objectives.

  18. Technical Assistance Project for the Minnesota Pollution Control Agency

    SciTech Connect (OSTI)

    Vimmerstedt, L.

    2006-12-01T23:59:59.000Z

    This report was prepared in response to a request for technical assistance from the Minnesota Pollution Control Agency (MPCA). The U.S. Department of Energy's (DOE) Office of Energy Efficiency and Renewable Energy supported the National Renewable Energy Laboratory (NREL) in its response to this request through the Technical Assistance Project. Discussion with the MPCA identified the following as the highest-priority questions: What is the effect of (1) size of Renewable Energy Reserve (RER) and (2) duration of allocation award on (a) NOx emissions in Minnesota and (b) retail electricity prices? What data is available on the response of wind energy development to financial incentives? This report addresses those questions.

  19. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance U.S. Army Project 214 Analysis of Regulations Associated with Implementation of a Rocky Mountain Secure Smart-Grid

    SciTech Connect (OSTI)

    Warwick, William M.

    2010-09-30T23:59:59.000Z

    This document describes technical assistance provided by PNNL to further develop a smart grid technologies concept to provide a basis for policies and plans for the US Army. The effort was to analyze the potential to utilize emerging smart grid technologies along with indigenous renewable and other resources to meet the emergency and other power needs of Department of Defense facilities in Colorado and Wyoming.

  20. DSpace@Cambridge Implementation Project website

    E-Print Network [OSTI]

    Morgan, Peter; Massiou, Anna

    2003-01-01T23:59:59.000Z

    combination of user evaluation, technical evaluation by peer review and formal testing, assessment by external experts, and a formal reporting mechanism in keeping with the CMI project evaluation requirements. 5. Outcomes and deliverables 5.1 An understanding... Libraries. 6.4 Evaluation Progress reports to CMI will be compiled and submitted at six-month intervals from the start of the project. These will assess the effectiveness of the management structure, a review of work to date, and an assessment of progress...

  1. West Virginia Smart Grid Implementation Plan (WV SGIP) Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WV DoE-NRCCE-APERC DRAFT February 16, 2009 1 West Virginia Smart Grid Implementation Plan (WV SGIP) Project APERC Report on Customer Complaints to WV PSC about Electric Power...

  2. West Virginia Smart Grid Implementation Plan (WV SGIP) Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    West Virginia Smart Grid Implementation Plan (WV SGIP) Project APERC Report on Assessment of As-Is Grid by Non-Utility Stakeholders Introduction One goal of this grid...

  3. Arroyo Colorado Watershed Protection Plan Implementation Project Final Report

    E-Print Network [OSTI]

    Berthold, T. Allen; Flores, Jaime

    2011-01-01T23:59:59.000Z

    Arroyo Colorado Watershed Protection Plan Implementation Project Final Report August 2011 By T. Allen Berthold and Jaime Flores Texas Water Resources Institute Texas Water Resources Institute Technical Report No. 411 Texas A&M University... System College Station, Texas 77843-2118 COLLEGE OF AGRICULTURE AND LIFE SCIENCES TR-411 2011 Arroyo Colorado Watershed Protection Plan Implementation Project Final Report By T. Allen Berthold and Jaime Flores Texas Water Resources...

  4. PROJECT SUMMARY REPORT 1515-S IMPLEMENTATION OF AN AUTOMATED

    E-Print Network [OSTI]

    Texas at Austin, University of

    PROJECT SUMMARY REPORT 1515-S IMPLEMENTATION OF AN AUTOMATED ROAD MAINTENANCE MACHINE (ARRM) Carl T;Technical Report Documentation Page 1. Report No. FHWA/TX-99/1515-S 2. Government Accession No. 3. Recipients Catalog No. 4. Title and Subtitle IMPLEMENTATION OF AN AUTOMATED ROAD MAINTENANCE MACHINE (ARMM) 5

  5. Solar For Schools: A Case Study in Identifying and Implementing Solar Photovoltaic (PV) Projects in Three California School Districts: Preprint

    SciTech Connect (OSTI)

    Kandt, A.

    2011-04-01T23:59:59.000Z

    The Department of Energy's (DOE) Solar America Showcase program seeks to accelerate demand for solar technologies among key end use market sectors. As part of this activity the DOE provides Technical Assistance through its national laboratories to large-scale, high-visibility solar installation projects. The Solar Schools Assessment and Implementation Project (SSAIP) in the San Francisco Bay area was selected for a 2009 DOE Solar American Showcase award. SSAIP was formed through the efforts of the nonprofit Sequoia Foundation and includes three school districts: Berkeley, West Contra Costa, and Oakland Unified School Districts. This paper summarizes the technical assistance efforts that resulted from this technical assistance support. It serves as a case study and reference document detailing the steps and processes that could be used to successfully identify, fund, and implement solar PV projects in school districts across the country.

  6. New Strategies for Implementing Locally Integrated Stream Restoration Projects

    E-Print Network [OSTI]

    Twente, Universiteit

    1 New Strategies for Implementing Locally Integrated Stream Restoration Projects Cheryl de Boer opportunities for improvements and alterations at different areas of the stream. Based on an existing framework acknowledgment and consequently, river restoration projects have commenced that are for a large portion in fact

  7. Final Report. SFAA No. DEFC02-98CH10961. Technical assistance for joint implementation and other supporting mechanisms and measures for greenhouse gas emissions mitigation

    SciTech Connect (OSTI)

    Knight, Denise

    2001-10-15T23:59:59.000Z

    IIEC, a division of CERF, has developed an extensive base of experience implementing activities that support climate action by developing USIJI projects in transitional countries within Asia, Latin America, Central and Eastern Europe, and southern Africa. IIEC has been able to provide a range of technical and policy assistance to governments and industry in support of sustainable energy use. IIEC continues to work in key countries with local partners to develop and implement energy efficiency policies and standards, develop site-specific projects, and assist governing bodies to establish national priorities and evaluation criteria for approving GHG-mitigation projects. As part of this project, IIEC focused on promoting a series of activities in Thailand and South Africa in order to identify GHG mitigation projects and work within the national approval process of those countries. The sections of this report outline the activities conducted in each country in order to achieve that goal.

  8. Procuring and Implementing Solar Projects on Public Buildings: How to Avoid Common Pitfalls

    Broader source: Energy.gov [DOE]

    Procuring and Implementing Solar Projects on Public Buildings: How to Avoid Common Pitfalls Webinar.

  9. CleanFleet. Volume 2, Project Design and Implementation

    SciTech Connect (OSTI)

    NONE

    1995-12-01T23:59:59.000Z

    The CleanFleet alternative fuels demonstration project evaluated five alternative motorfuels in commercial fleet service over a two-year period. The five fuels were compressed natural gas, propane gas, California Phase 2 reformulated gasoline (RFG), M-85 (85 percent methanol and 15 percent RFG), and electric vans. Eight-four vans were operated on the alternative fuels and 27 vans were operated on gasoline as baseline controls. Throughout the demonstration information was collected on fleet operations, vehicle emissions, and fleet economics. In this volume of the CleanFleet findings, the design and implementation of the project are summarized.

  10. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1992-10-01T23:59:59.000Z

    The Uranium Mill Tallings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1 (Chapter 3, paragraph 2). The UMTRA EPIP covers the time period of November 9, 1992, through November 8, 1993. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  11. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    SciTech Connect (OSTI)

    Not Available

    1994-10-01T23:59:59.000Z

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  12. Geothermal direct-heat utilization assistance. Quarterly project progress report, January--March 1994

    SciTech Connect (OSTI)

    Not Available

    1994-05-01T23:59:59.000Z

    The Geo-Heat Center provides technical assistance on geothermal direct heat applications to developers, consultants and the public which could include: data and information on low-temperature (< 1500 C) resources, space and district heating, geothermal heat pumps, greenhouses, aquaculture, industrial processes and other technologies. This assistance could include preliminary engineering feasibility studies, review of direct-use project plans, assistance in project material and equipment selection, analysis and solutions of project operating problems, and information on resources and utilization. The following are brief descriptions of technical assistance provided during the second quarter of the program.

  13. Couse/Tenmile Creeks Watershed Project Implementation : 2007 Conservtion Projects. [2007 Habitat Projects Completed].

    SciTech Connect (OSTI)

    Asotin County Conservation District

    2008-12-10T23:59:59.000Z

    The Asotin County Conservation District (ACCD) is the primary entity coordinating habitat projects on private lands within Asotin County watersheds. The Tenmile Creek watershed is a 42 square mile tributary to the Snake River, located between Asotin Creek and the Grande Ronde River. Couse Creek watershed is a 24 square mile tributary to the Snake River, located between Tenmile Creek and the Grande Ronde River. Both watersheds are almost exclusively under private ownership. The Washington Department of Fish and Wildlife has documented wild steelhead and rainbow/redband trout spawning and rearing in Tenmile Creek and Couse Creek. The project also provides Best Management Practice (BMP) implementation throughout Asotin County, but the primary focus is for the Couse and Tenmile Creek watersheds. The ACCD has been working with landowners, Bonneville Power Administration (BPA), Washington State Conservation Commission (WCC), Natural Resource Conservation Service (NRCS), Farm Service Agency (FSA), Salmon Recovery Funding Board (SRFB), Washington Department of Fish and Wildlife (WDFW), U.S. Forest Service, Pomeroy Ranger District (USFS), Nez Perce Tribe (NPT), Washington Department of Ecology (DOE), National Marine Fisheries Service (NOAA Fisheries), and U.S. Fish and Wildlife Service (USFWS) to address habitat projects in Asotin County. The Asotin Subbasin Plan identified priority areas and actions for ESA listed streams within Asotin County. Couse Creek and Tenmile Creek are identified as protection areas in the plan. The Conservation Reserve Enhancement Program (CREP) has been successful in working with landowners to protect riparian areas throughout Asotin County. Funding from BPA and other agencies has also been instrumental in protecting streams throughout Asotin County by utilizing the ridge top to ridge top approach.

  14. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    SciTech Connect (OSTI)

    Vollmer, A.T.

    1993-10-01T23:59:59.000Z

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  15. Project Implementation Seminar Series: Creating a Climate for Successful Project Implementation, December 9, 2009

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreakingMay 2015 < prev next >PresentationsNow LEADER Web Conference 1 Project

  16. Pile Structure Program, Projected Start Date : January 1, 2010 (Implementation).

    SciTech Connect (OSTI)

    Collins, Chris; Corbett, Catherine [Lower Columbia River Estuary Partnership; Ebberts, Blaine [U.S. Army Corps of Engineers

    2009-07-27T23:59:59.000Z

    The 2008 Federal Columbia River Power System Biological Opinion includes Reasonable and Prudent Alternative 38-Piling and Piling Dike Removal Program. This RPA directs the Action Agencies to work with the Estuary Partnership to develop and implement a piling and pile dike removal program. The program has since evolved to include modifying pile structures to enhance their habitat value and complexity by adding large woody debris. The geographic extent of the Pile Structure Program (PSP) includes all tidally-influenced portions of the lower Columbia River below Bonneville Dam; however, it will focus on the mainstem. The overarching goal of the PSP is to enhance and restore ecosystem structure and function for the recovery of federally listed salmonids through the active management of pile structures. To attain this goal, the program team developed the following objectives: (1) Develop a plan to remove or modify pile structures that have lower value to navigation channel maintenance, and in which removal or modification will present low-risk to adjacent land use, is cost-effective, and would result in increased ecosystem function. (2) Determine program benefits for juvenile salmonids and the ecosystem through a series of intensively monitored pilot projects. (3) Incorporate best available science and pilot project results into an adaptive management framework that will guide future management by prioritizing projects with the highest benefits. The PSP's hypotheses, which form the basis of the pilot project experiments, are organized into five categories: Sediment and Habitat-forming Processes, Habitat Conditions and Food Web, Piscivorous Fish, Piscivorous Birds, and Toxic Contaminant Reduction. These hypotheses are based on the effects listed in the Estuary Module (NOAA Fisheries in press) and others that emerged during literature reviews, discussions with scientists, and field visits. Using pilot project findings, future implementation will be adaptively managed to maximize program benefits and address limiting factors.

  17. Technical assistance for Meharry Medical College Energy Efficiency Project. Final project status and technical report

    SciTech Connect (OSTI)

    NONE

    1996-05-08T23:59:59.000Z

    This report presents the results of a program to provide technical assistance to Meharry Medical College. The purpose of the program is to facilitate Meharry`s effort to finance a campus-wide facility retrofit. The US Department of Energy (USDOE) funded the program through a grant to the Tennessee Department of Economic and Community Development (TECD). The University of Memphis-Technology and Energy Services (UM-TES), under contract to TECD, performed program services. The report has three sections: (1) introduction; (2) project definition, financing, and participants; and (3) opportunities for federal participation.

  18. EM Projects Perspective - Jack Surash, Deputy Assistant Secretary...

    Office of Environmental Management (EM)

    and Project Management, Environmental Management Presentation Topics EM Funding Evolution of EM Contracts EM Portfolio Project Success Workshop 2015 -Jack SurashEM Projects...

  19. Procuring and Implementing Solar Projects on Public Buildings: How to Avoid Common Pitfalls (Text Version)

    Broader source: Energy.gov [DOE]

    Transcript of the webinar, "Procuring and Implementing Solar Projects on Public Buildings: How to Avoid Common Pitfalls."

  20. assistance demonstration project: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in urban;Concept Description A series of working and well displayed renewable energy generation sources on an urban Bruneau, Steve 7 The Assistive Kitchen --A...

  1. Geothermal direct-heat utilization assistance. Quarterly project progress report, July 1996--September 1996. Federal Assistance Program

    SciTech Connect (OSTI)

    Lienau, P.

    1996-11-01T23:59:59.000Z

    This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the fourth quarter of FY-96. It describes 152 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment, economics and resources. Research activities are summarized on greenhouse peaking. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

  2. Energy Design Assistance Project Tracker - 2014 BTO Peer Review...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    project also includes compiling and disseminating data about the cost effectiveness of net zero energy (NZE) buildings that use innovative technologies and design approaches. By...

  3. U.S. DOE Technical Assistance Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTri Global Energy LLC Place: Dallas, Texas2022WindU S Army CorpsAssistance

  4. Assisting Mexico in Developing Energy Supply and Demand Projections | Open

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof EnergyInnovation in Carbon Capture andsoftwareAsianEnergy Information Assisting

  5. Geothermal direct-heat utilization assistance. Quarterly project progress report, January--March 1996

    SciTech Connect (OSTI)

    NONE

    1996-05-01T23:59:59.000Z

    This report summarizes geothermal technical assistance, R&D, and technology transfer activities of the Geo-Heat Center. It describes 95 contacts with parties during this period related to technical assistance with goethermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment, economics, and resources. Research activities are summarized on geothermal district heating system cost evaluation and silica waste utilization project. Outreach activities include publication of a geothermal direct use Bulletin, dissemination of information, goethermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

  6. Geothermal direct-heat utilization assistance. Federal Assistance Program, Quarterly project progress report, October--December 1994

    SciTech Connect (OSTI)

    Not Available

    1994-12-31T23:59:59.000Z

    The report summarizes activities of the Geo-Heat Center (GHC) at Oregon Institute of Technology for the first quarter of Fiscal Year 1995. It describes contacts with parties during this period related to assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, resources and equipment. Research is also being conducted on geothermal energy cost evaluation, low-temperature geothermal resource assessment, use of silica waste from the Cerro Prieto geothermal field as construction materials and geothermal heat pumps. Outreach activities include the publication of a quarterly Bulletin on direct heat applications and dissemination of information on low-temperature geothermal resources and utilization.

  7. Tech-Specific Assistance Preliminary Screening for Project

    E-Print Network [OSTI]

    Oak Ridge National Laboratory

    or ground-source heat pumps (GHPs) are a highly efficient method of providing heating and cooling for Geothermal Heat Pump Retrofit Projects GHPs Should Always be Considered for Federal Sites Geothermal their energy and cost savings potential, and their wide range of applicability, GHPs should always

  8. NREL: Technology Deployment - Project Technical Assistance and Support

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible for Renewable Energy: Grid Integration NRELCostBuildingModels andProject Success

  9. Geothermal direct-heat utilization assistance. Federal Assistance Program quarterly project progress report, April 1--June 30, 1998

    SciTech Connect (OSTI)

    NONE

    1998-07-01T23:59:59.000Z

    This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the third quarter of FY98 (April--June, 1998). It describes 231 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with included requests for general information including material for high school and university students, and material on geothermal heat pumps, resource and well data, spacing heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, snow melting and electric power. Research activities include work on model construction specifications for line shaft submersible pumps and plate heat exchangers, and a comprehensive aquaculture developers package. A brochure on Geothermal Energy in Klamath County was developed for state and local tourism use. Outreach activities include the publication of the Quarterly Bulletin (Vol. 19, No. 2) with articles on research at the Geo-Heat Center, sustainability of geothermal resources, injection well drilling in Boise, ID and a greenhouse project in the Azores. Other outreach activities include dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisitions and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

  10. Energy Department Expands Technical Assistance for Tribal Energy Projects |

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China 2015 Business42.1EnergyofDepartment of Energy ToProjectTrainDepartmentDepartment

  11. U.S. DOE Technical Assistance Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty Edit withTianlin Baxin HydropowerTrinityTurnbull Hydro LLC Jump to:PageTwoJumpProject)

  12. The implementation of the Lower Silver Creek watershed project

    E-Print Network [OSTI]

    Keenan, Christina; McPherson, Mariah

    2003-01-01T23:59:59.000Z

    Measures on Lower Silver Creek Interim Project. San Jose,Valley Water District. May 1978. Lower Silver Creek, LakeCunningham, Thompson Creek Planning Survey consisting of

  13. Design and implementation of a financial planning and tracking system for the Nova Project

    SciTech Connect (OSTI)

    Holcomb, F.

    1982-01-01T23:59:59.000Z

    The Nova project is a 185 million dollar DOE funded project to build an experimental facility to demonstrate the thermonuclear ignition of laser fusion targets. This paper describes the design and implementation considerations for the project's computerized performance measurement financial planning and tracking system and critiques its actual operation.

  14. United States Gulf Coast geopressured geothermal program. Special projects research and coordination assistance. Final report, 1 December 1978-30 October 1980

    SciTech Connect (OSTI)

    Dorfman, M.H.; Morton, R.A.

    1981-06-01T23:59:59.000Z

    Work for the period, December 1, 1978 through October 31, 1980, is documented. The following activities are covered: project technical coordination assistance and liaison; technical assistance for review and evaluation of proposals and contract results; technical assistance for geopressured-geothermal test wells; technical assistance, coordination, and planning of surface utilization program; legal research; and special projects. (MHR)

  15. Geothermal direct-heat utilization assistance. Quarterly project progress report, April--June 1993

    SciTech Connect (OSTI)

    Lienau, P.

    1993-06-01T23:59:59.000Z

    Technical assistance was provided to 60 requests from 19 states. R&D progress is reported on: evaluation of lineshaft turbine pump problems, geothermal district heating marketing strategy, and greenhouse peaking analysis. Two presentations and one tour were conducted, and three technical papers were prepared. The Geothermal Progress Monitor reported: USGS Forum on Mineral Resources, Renewable Energy Tax Credits Not Working as Congress Intended, Geothermal Industry Tells House Panel, Newberry Pilot Project, and Low-Temperature Geothermal Resources in Nevada.

  16. Implementing Solar Projects on Federal Sites | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy ChinaofSchaefer To:DepartmentDepartment of Energy Implementing Agreement -GuideThis

  17. The effects of the implementation of grey water reuse systems on construction cost and project schedule

    E-Print Network [OSTI]

    Kaduvinal Varghese, Jeslin

    2009-05-15T23:59:59.000Z

    of the United States due to their effects on construction cost and project schedules. Even though a project could get one or multiple points upon successful implementation of a grey water reuse system and conserving potable water, the following factors may have...

  18. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    SciTech Connect (OSTI)

    MITCHELL, R.L.

    2000-01-10T23:59:59.000Z

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.

  19. Implementation of the Brazilian National Repository - RBMN Project - 13008

    SciTech Connect (OSTI)

    Cassia Oliveira de Tello, Cledola [CDTN - Center for Development of Nuclear Technology, Av. Presidente Antonio Carlos, 6.627 - Campus UFMG - Pampulha, CEP 31270-901 - Belo Horizonte - MG (Brazil)

    2013-07-01T23:59:59.000Z

    Ionizing radiation in Brazil is used in electricity generation, medicine, industry, agriculture and for research and development purposes. All these activities can generate radioactive waste. At this point, in Brazil, the use of nuclear energy and radioisotopes justifies the construction of a national repository for radioactive wastes of low and intermediate-level. According to Federal Law No. 10308, Brazilian National Commission for Nuclear Energy (CNEN) is responsible for designing and constructing the intermediate and final storages for radioactive wastes. Additionally, a restriction on the construction of Angra 3 is that the repository is under construction until its operation start, attaining some requirements of the Brazilian Environmental Regulator (IBAMA). Besides this NPP, in the National Energy Program is previewed the installation of four more plants, by 2030. In November 2008, CNEN launched the Project RBMN (Repository for Low and Intermediate-Level Radioactive Wastes), which aims at the implantation of a National Repository for disposal of low and intermediate-level of radiation wastes. This Project has some aspects that are unique in the Brazilian context, especially referring to the time between its construction and the end of its institutional period. This time is about 360 years, when the area will be released for unrestricted uses. It means that the Repository must be safe and secure for more than three hundred years, which is longer than half of the whole of Brazilian history. This aspect is very new for the Brazilian people, bringing a new dimension to public acceptance. Another point is this will be the first repository in South America, bringing a real challenge for the continent. The current status of the Project is summarized. (authors)

  20. Project Financing: From Identification to Implementation | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreakingMay 2015 < prev next >Presentations Program4DepartmentProject

  1. Geothermal direct-heat utilization assistance. Quarterly project progress report, July--September 1997

    SciTech Connect (OSTI)

    NONE

    1997-10-01T23:59:59.000Z

    This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the fourth quarter of FY-97 (July--September 1997). It describes 213 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps, geothermal heat pumps, resource and well data, space heating and cooling, greenhouses, acquaculture, equipment, district heating, resorts and spas, and industrial applications. Research activities include the completion of a Comprehensive Greenhouse Developer Package. Work accomplished on the revision of the Geothermal Direct Use Engineering and Design Guidebook are discussed. Outreach activities include the publication of the Quarterly Bulletin (Vol. 18, No. 3), dissemination of information mainly through mailings of publications, geothermal library acquisition and use, participation in workshops, short courses, and technical meetings by the staff, and progress monitor reports on geothermal activities.

  2. Geothermal direct-heat utilization assistance: Quarterly project progress report, January--March 1995

    SciTech Connect (OSTI)

    NONE

    1995-05-01T23:59:59.000Z

    The report summarizes geothermal activities of the Geo-Heat Center at Oregon Institute of Technology for the second quarter of FY-95. It describes 92 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, resources and equipment. Research activities are summarized on geothermal energy cost evaluation, low temperature resource assessment and ground-source heat pump case studies and utility programs. Outreach activities include the publication of a geothermal direct heat Bulletin, dissemination of information, geothermal library, and progress monitor reports on geothermal resources and utilization.

  3. A comprehensive approach to the formulation of capital projects in developing countries : finance and implementation. Case study, Edendale, Kwazulu (housing)

    E-Print Network [OSTI]

    Davis, Trevor Paul

    1983-01-01T23:59:59.000Z

    This Thesis deals with capital project formulation in developing countries. The objective is to provide guidelines for the formulation of housing development projects, their implementation structures and financial plans ...

  4. Software Environment for the Implementation of Tomographic Reconstruction Algorithms Applied to Cases of Few Projections

    SciTech Connect (OSTI)

    Rios, A. B. [Escuela de Ciencia y Tecnologia--Universidad Nacional de San Martin (UNSAM) (Argentina); Consejo Nacional de Investigaciones Cientificas y Tecnicas (CONICET) (Argentina); Valda, A.; Somacal, H. [Escuela de Ciencia y Tecnologia-Universidad Nacional de San Martin (UNSAM) (Argentina); Laboratorio Tandar, Comision Nacional de Energia Atomica (CNEA) (Argentina)

    2007-10-26T23:59:59.000Z

    Usually tomographic procedure requires a set of projections around the object under study and a mathematical processing of such projections through reconstruction algorithms. An accurate reconstruction requires a proper number of projections (angular sampling) and a proper number of elements in each projection (linear sampling). However in several practical cases it is not possible to fulfill these conditions leading to the so-called problem of few projections. In this case, iterative reconstruction algorithms are more suitable than analytic ones. In this work we present a program written in C++ that provides an environment for two iterative algorithm implementations, one algebraic and the other statistical. The software allows the user a full definition of the acquisition and reconstruction geometries used for the reconstruction algorithms but also to perform projection and backprojection operations. A set of analysis tools was implemented for the characterization of the convergence process. We analyze the performance of the algorithms on numerical phantoms and present the reconstruction of experimental data with few projections coming from transmission X-ray and micro PIXE (Particle-Induced X-Ray Emission) images.

  5. Project Hanford management contract quality assurance program implementation plan for nuclear facilities

    SciTech Connect (OSTI)

    Bibb, E.K.

    1997-10-15T23:59:59.000Z

    During transition from the Westinghouse Hanford Company (WHC) Management and Operations (M and O) contract to the Fluor Daniel Hanford (FDH) Management and Integration (M and I) contract, existing WHC policies, procedures, and manuals were reviewed to determine which to adopt on an interim basis. Both WHC-SP-1131,Hanford Quality Assurance Program and Implementation Plan, and WHC-CM-4-2, Quality Assurance Manual, were adopted; however, it was recognized that revisions were required to address the functions and responsibilities of the Project Hanford Management Contract (PHMC). This Quality Assurance Program Implementation Plan for Nuclear Facilities (HNF-SP-1228) supersedes the implementation portion of WHC-SP-1 13 1, Rev. 1. The revised Quality Assurance (QA) Program is documented in the Project Hanford Quality Assurance Program Description (QAPD), HNF-MP-599. That document replaces the QA Program in WHC-SP-1131, Rev. 1. The scope of this document is limited to documenting the nuclear facilities managed by FDH and its Major Subcontractors (MSCS) and the status of the implementation of 10 CFR 830.120, Quality Assurance Requirements, at those facilities. Since the QA Program for the nuclear facilities is now documented in the QAPD, future updates of the information provided in this plan will be by letter. The layout of this plan is similar to that of WHC-SP-1 13 1, Rev. 1. Sections 2.0 and 3.0 provide an overview of the Project Hanford QA Program. A list of Project Hanford nuclear facilities is provided in Section 4.0. Section 5.0 provides the status of facility compliance to 10 CFR 830.120. Sections 6.0, 7.0, and 8.0 provide requested exemptions, status of open items, and references, respectively. The four appendices correspond to the four projects that comprise Project Hanford.

  6. Commissioning Aid and Decision Making Assistance Tool 'Implementation & Assessment' - Case Study

    E-Print Network [OSTI]

    Belkadi-Hannachi, N.; Jandon, M.; Nejad, H. V.; Guena, F.; Diab, Y.

    2006-01-01T23:59:59.000Z

    the renovation and the modernization of social dwelling. It is classified as a project of low energy buildings. The partners whose are doing this project are pioneers in term of social dwelling renovation: Logirep, BASF, and CSTB. The objective... Environment?2 certification delivered by Cerqual3. BASF, number one of the chemical industry in the world has participated in collaboration with Buildings Company in the realization of low energy buildings called ?3L Housing?. Those building?s consumption...

  7. Safety basis academy summary of project implementation from 2007-2009

    SciTech Connect (OSTI)

    Johnston, Julie A [Los Alamos National Laboratory

    2009-01-01T23:59:59.000Z

    During fiscal years 2007 through 2009, in accordance with Performance Based Incentives with DOE/NNSA Los Alamos Site Office, Los Alamos National Security (LANS) implemented and operated a Safety Basis Academy (SBA) to facilitate uniformity in technical qualifications of safety basis professionals across the nuclear weapons complex. The implementation phase of the Safety Basis Academy required development, delivery, and finalizing a set of 23 courses. The courses developed are capable of supporting qualification efforts for both federal and contractor personnel throughout the DOE/NNSA Complex. The LANS Associate Director for Nuclear and High Hazard Operations (AD-NHHO) delegated project responsibillity to the Safety Basis Division. The project was assigned to the Safety Basis Technical Services (SB-TS) Group at Los Alamos National Laboratory (LANL). The main tasks were project needs analysis, design, development, implementation of instructional delivery, and evaluation of SBA courses. DOE/NNSA responsibility for oversight of the SBA project was assigned to the Chief of Defense for Nuclear Safety, and delegated to the Authorization Basis Senior Advisor, Continuous Learning Chair (CDNS-ABSA/CLC). NNSA developed a memorandum of agreement with LANS AD-NHHO. Through a memorandum of agreement initiated by NNSA, the DOE National Training Center (NTC) will maintain the set of Safety Basis Academy courses and is able to facilitate course delivery throughout the DOE Complex.

  8. Undergraduate Project: Implementing a Graphical User Interface for Real-Time Wireless Sensor Network Control and Data Visualization

    E-Print Network [OSTI]

    will be tasked with designing, implementing, and testing a graphical user interface (GUI) to control a customUndergraduate Project: Implementing a Graphical User Interface for Real-Time Wireless Sensor Network Control and Data Visualization Marc J. Rubin and Tracy Camp In this project, the undergraduate

  9. Federal assistance program. Quarterly project progress report, January 1998--March 1998

    SciTech Connect (OSTI)

    NONE

    1998-04-01T23:59:59.000Z

    This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the second quarter of FY-98-98 (January-March, 1998). It describes 268 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps and material for high school debates, and material on geothermal heat pumps, resource and well data, spacing heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, electric power and snow melting. Research activities include work on model construction specifications for line shaft submersible pumps and plate heat exchangers and a comprehensive aquaculture developer package. The revised Geothermal Direct Use Engineering and Design Guidebooks was completed, published and is available for distribution. Outreach activities include the publication of the Quarterly Bulletin (Vol. 19, No. 1) which was devoted entirely to geothermal equipment, dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisitions and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

  10. Step 4: Project Implementation Introduction to Step 5: Project Operations & Maintenance

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently AskedEnergyIssues DOE's NuclearSpurringSteam Systems Steam Systems4: Project5:

  11. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance for Geothermal Resource Evaluation Projects

    SciTech Connect (OSTI)

    Robert P. Breckenridge; Thomas R. Wood; Joel Renner

    2010-09-01T23:59:59.000Z

    The purpose of this document is to report on the evaluation of geothermal resource potential on and around three different United States (U. S.) Air Force Bases (AFBs): Nellis AFB and Air Force Range (AFR) in the State of Nevada (see maps 1 and 5), Holloman AFB in the State of New Mexico (see map 2), and Mountain Home AFB in the State of Idaho (see map 3). All three sites are located in semi-arid parts of the western U. S. The U. S. Air Force, through its Air Combat Command (ACC) located at Langley AFB in the State of Virginia, asked the Federal Energy Management Program (FEMP) for technical assistance to conduct technical and feasibility evaluations for the potential to identify viable geothermal resources on or around three different AFBs. Idaho National Laboratory (INL) is supporting FEMP in providing technical assistance to a number of different Federal Agencies. For this report, the three different AFBs are considered one project because they all deal with potential geothermal resource evaluations. The three AFBs will be evaluated primarily for their opportunity to develop a geothermal resource of high enough quality grade (i.e., temperature, productivity, depth, etc.) to consider the possibility for generation of electricity through a power plant. Secondarily, if the resource for the three AFBs is found to be not sufficient enough for electricity generation, then they will be described in enough detail to allow the base energy managers to evaluate if the resource is suitable for direct heating or cooling. Site visits and meetings by INL personnel with the staff at each AFB were held in late FY-2009 and FY-2010. This report provides a technical evaluation of the opportunities and challenges for developing geothermal resources on and around the AFBs. An extensive amount of literature and geographic information was evaluated as a part of this assessment. Resource potential maps were developed for each of the AFBs.

  12. Implementation of an Integrated Information Management System for the US DOE Hanford Tank Farms Project

    SciTech Connect (OSTI)

    Joyner, William Scott [Washington River Protection Systems, Richland, WA (United States); Knight, Mark A. [Washington River Protection Systems, Richland, WA (United States)

    2013-11-14T23:59:59.000Z

    In its role as the Tank Operations Contractor at the U.S. Department of Energy's site in Hanford, WA, Washington River Protection Solutions, LLC is implementing an integrated document control and configuration management system. This system will combine equipment data with technical document data that currently resides in separate disconnected databases. The new system will provide integrated information, enabling users to more readily identify the documents that relate to a structure, system, or component and vice-versa. Additionally, the new system will automate engineering work processes through electronic workflows, and where practical and feasible provide integration with design authoring tools. Implementation of this system will improve configuration management of the technical baseline, increase work process efficiencies, support the efficient design of future large projects, and provide a platform for the efficient future turnover of technical baseline data and information.

  13. Notice of Intent to Develop DOE G 415.1-1, Information Technology Project Execution Model Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-03-06T23:59:59.000Z

    The proposed guide will support consistent and effective implementation of DOE O 415.1 and will assist IT Program and Project Managers in effectively managing and applying sound project management to IT projects subject to that order.

  14. Joint implementation initiatives in South Africa: A case study of two energy-efficiency projects

    SciTech Connect (OSTI)

    Van Horen, C.; Simmonds, G.; Parker, G.

    1998-11-01T23:59:59.000Z

    This paper explores the issues pertinent to Joint Implementation (JI) in South Africa by examining two prototype potential projects on energy efficiency with the potential for reducing greenhouse gas (GHG) emissions. The first is an energy-efficient lighting project based on the public electricity utility, Eskom's plan for a compact fluorescent lighting program in the residential sector. The analysis indicates that the CFL program could avoid emissions of up to 243 thousand tons of carbon over the first five years, at negative cost (that is, with a positive economic return). The second project involves the delivery of passive solar, energy-efficient housing to a low-income township in the Western Cape Province, at an incremental capital cost of approximately $2.5m for the 6000 houses. In this case, the avoided GHG emissions over the first five years amount to between 14 and 20 tons of carbon, and over the 50 year life-span of the project it will result to 140 to 200 thousand tons of avoided emissions at a cost of $13 to $17 per ton. The housing project has significant non-GHG benefits such as savings on energy bills and health, which accrue to the low-income dwellers. A number of important JI-specific issues and concerns emerge with respect to the two projects, which can also be applied to other potential JI opportunities in the country generally. These include the issues of carbon credit sharing, for which a number of scenarios are suggested, as well as estimating unknown macroeconomic impacts, such as the effects of CFLs on the country's incandescent lighting industry. Findings from an examination of both potential projects conclude that capacity-building within the country is critical to ensure that the technology being transferred balances efficiency, cost and quality appropriate to the South African context. Finally, assessment and evaluation, monitoring and verification criteria and institutions are called for to guarantee measurable long-term environmental, economic and other non-GHG related benefits of potential JI projects.

  15. Technical assistance to Ohio closure sites; Technologies to address leachate from the on-site disposal facility at Fernald Environmental Management Project, Ohio

    SciTech Connect (OSTI)

    Hazen, Terry

    2002-08-26T23:59:59.000Z

    On August 6-7, 2002, a Technical Assistance Team (''Team'') from the U.S. Department of Energy (DOE) Subsurface Contaminants Focus Area (SCFA) met with Fernald Environmental Management Project (FEMP) personnel in Ohio to assess approaches to remediating uranium-contaminated leachate from the On-Site Disposal Facility (OSDF). The Team was composed of technical experts from national labs, technology centers, and industry and was assembled in response to a request from the FEMP Aquifer Restoration Project. Dave Brettschneider of Fluor Fernald, Inc., requested that a Team of experts be convened to review technologies for the removal of uranium in both brine ion exchange regeneration solution from the Advanced Wastewater Treatment facility and in the leachate from the OSDF. The Team was asked to identify one or more technologies for bench-scale testing as a cost effective alternative to remove uranium so that the brine regeneration solution from the Advanced Waste Water Treatment facility and the leachate from the OSDF can be discharged without further treatment. The Team was also requested to prepare a recommended development and demonstration plan for the alternative technologies. Finally, the Team was asked to make recommendations on the optimal technical solution for field implementation. The Site's expected outcomes for this effort are schedule acceleration, cost reduction, and better long-term stewardship implementation. To facilitate consideration of the most appropriate technologies, the Team was divided into two groups to consider the brine and the leachate separately, since they represent different sources with different constraints on solutions, e.g., short-term versus very long-term and concentrated versus dilute contaminant matrices. This report focuses on the technologies that are most appropriate for the leachate from the OSDF. Upon arriving at FEMP, project personnel asked the Team to concentrate its efforts on evaluating potential technologies and strategies to reduce uranium concentration in the leachate.

  16. Implementation of a Project Management System for Improvement to City, State's Design and Construction Capital Project Delivery

    E-Print Network [OSTI]

    Thompson, Chad C.

    2007-05-18T23:59:59.000Z

    than 400 projects with budgets of over a half billion dollars. It has shifted the capital improvement project delivery from a multi-departmental style of delivery to a project management style of delivery through the infusion of private consultants...

  17. START Program for Renewable Energy Project Development Assistance Non-Disclosure Agreement

    Broader source: Energy.gov [DOE]

    Download the Non-Disclosure Agreement to submit along with your application for the DOE Office of Indian Energy Strategic Technical Assistance Response Team (START) Program for Renewable Energy...

  18. Implementation of UMTRA Project Environmental Audit Action Plan status report for period ending September 30, 1992

    SciTech Connect (OSTI)

    Not Available

    1992-09-01T23:59:59.000Z

    This report provides the status of implementation of corrective actions for findings made in an Environmental Audit conducted by DOE Headquarters, Office of Environmental Audit, in June 1991. An Action Plan, dated December 1991, was developed to address the findings. The Action Plan was approved by DOE Headquarters, Office of Environment, Safety and Health, in July 1992. This report provides status for each activity listed in the approved Action Plan. Of 48 findings identified in the August 1991 Environmental Audit Report, 4 required no action, 5 were combined with others and actions to correct 19 are complete. Although it appears no progress has been made since the last status report was issued, UMTRA has completed 89% of the findings identified, compared to 72% identified in the last status report. The table below lists the 20 findings where actions are still underway, the current projected completion date, the organization(s) responsible for taking action on the finding, and the UMTRA Project Off ice staff member assigned responsibility for the finding.

  19. Federal Sector Renewable Energy Project Implementation: "What's Working and Why"Implementation: What s Working and Why

    E-Print Network [OSTI]

    for Sustainable Energy, LLC #12;Innovation for Our Energy Future Contents Federal Sector Renewable Energy Project (Large scale) Photovoltaics (PV) Concentrating Solar Power (CSP) (with storage) Wind Biomass power/year Federal Tax Credits CO (Xcel Energy) CO (Xcel Energy) 30% ITC, ACRS "Behind the meter" Sale of Power

  20. New York University -Export Control Checklist Use this checklist to assist in determining whether or not Export Control regulations apply to your project.

    E-Print Network [OSTI]

    Wang, Da-Neng

    New York University - Export Control Checklist Use this checklist to assist in determining whether or not Export Control regulations apply to your project. Does this project or agreement: YES NO Restrict List ("CCL") under the Export Administration Regulations ("EAR"; see http

  1. Implementation of manufacturing data management application in the scientific research project. Case: CERN, the European Organization for Nuclear Research

    E-Print Network [OSTI]

    Saifoulina, Margarita

    2010-01-01T23:59:59.000Z

    This Bachelors thesis examined the implementation process of an MTF (Manufacturing and Test Folder) application in the CLIC (Compact Linear Collider) Radio Frequency Structure Development project for manufacturing data management purposes. The primary goal of the study was to investigate how MTF implementation and its integration with CERN EDMS (Engineering and Equipment Data Management System) system could facilitate product life cycle through the supply chain, and could affect on manufacturing operations performance in internaland external levels. The aim of the study was also to find out implementation differences within CERN (European Organization for Nuclear Research) projects. The study is divided into two parts: a qualitative theory section and an empirical section. In the theory section differences of features between PDM (Product Data Management), EDM (Engineering Data Management) and PLM (Product Life Cycle Management) systems were studied. The thesis examined the benefits and managerial challeng...

  2. Energy Conservation Recommendations, Implementation Costs, and Projected Paybacks for Georgia's Targeted Schools and Hospitals Conservation Program

    E-Print Network [OSTI]

    Brown, M. L.; Moore, D. M.

    1988-01-01T23:59:59.000Z

    During the past year the Georgia Tech Research Institute performed technical assistance studies on over 100 school and hospital buildings under a program funded by the Governor's Office of Energy Resources. This program is known as the Targeted...

  3. Previous Technical Assistance | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Technical assistance provided to WGAWIEB by the Electricity Market Studies Group of LBNL and The Regulatory Assistance Project (RAP); and More limited technical assistance...

  4. Geothermal direct-heat utilization assistance. Quarterly project progress report, October--December 1993

    SciTech Connect (OSTI)

    Not Available

    1993-12-31T23:59:59.000Z

    This report consists of brief summaries of the activities of the Geo-Heat Center during the report period. Technical assistance was given to requests from 20 states in the following applications: space and district heating; geothermal heat pumps; greenhouses; aquaculture; industrial plants; electric power; resource/well; equipment; and resort/spa. Research and development activities progressed on (1) compilation of data on low-temperature resources and (2) evaluation of groundwater vs. ground-coupled heat pumps. Also summarized are technology transfer activities and geothermal progress monitoring activities.

  5. Assessing Nurse and Medical Assistant Perceived Needs Prior to Implementation of Expanded Web-based Training in Physician Clinics

    E-Print Network [OSTI]

    Hopkins, Pamela Jean Clinton

    2012-07-16T23:59:59.000Z

    using open-ended questions emphasizing perceived strengths, weaknesses, opportunities and threats (SWOT) of WBT. Demographic data were collected to facilitate comparison of perspectives based on demographic information gathered. To support reliability... Unlicensed Medical Assistant M Median n Sample Size N Population RN Registered Nurse SWOT Strengths, Weaknesses, Opportunities, Threats TMF Trinity Mother Frances Hospitals and Clinics Vets Veterans WBT Web-based Training xi TABLE...

  6. Quality assurance project plan for the UMTRA technical assistance contractor hydrochemistry facility. Final report

    SciTech Connect (OSTI)

    NONE

    1993-07-01T23:59:59.000Z

    The Uranium Mill Tailings Remedial Action (UMTRA) hydrochemistry facility is used to perform a limited but important set of services for the UMTRA Project. Routine services include support of field-based hydrological and geochemical operations and water sampling activities. Less commonly, the hydrology and geochemistry staff undertake special studies and site characterization studies at this facility. It is also used to train hydrologists, geochemists, and groundwater sampling crews. A review of this Quality Assurance Project Plan (QAPP) shall be accomplished once each calendar year. This review will be targeted to be accomplished not sooner than 6 months and not later than 18 months after the last review.

  7. The Regulatory Assistance Project 50 State Street, Suite 3 Montpelier, VT 05602

    E-Print Network [OSTI]

    and environmental sustainability of the power and natural gas sectors. RAP has deep expertise in regulatory and market policies that: Promote economic efficiency Protect the environment Ensure system reliability on a recent RAP paper: What Lies Beyond Capacity Markets? for the Pacific Northwest Demand Response Project

  8. Accelerating the Whiteshell Laboratories Decommissioning Through the Implementation of a Projectized and Delivery-Focused Organization - 13074

    SciTech Connect (OSTI)

    Wilcox, Brian; Mellor, Russ; Michaluk, Craig [Atomic Energy of Canada Limited, Whiteshell Laboratories, Pinawa, Manitoba (Canada)] [Atomic Energy of Canada Limited, Whiteshell Laboratories, Pinawa, Manitoba (Canada)

    2013-07-01T23:59:59.000Z

    Whiteshell Laboratories (WL) is a nuclear research site in Canada that was commissioned in 1964 by Atomic Energy of Canada Limited. It covers a total area of approximately 4,375 hectares (10,800 acres) and includes the main campus site, the Waste Management Area (WMA) and outer areas of land identified as not used for or impacted by nuclear development or operations. The WL site employed up to 1100 staff. Site activities included the successful operation of a 60 MW organic liquid-cooled research reactor from 1965 to 1985, and various research programs including reactor safety research, small reactor development, fuel development, biophysics and radiation applications, as well as work under the Canadian Nuclear Fuel Waste Management Program. In 1997, AECL made a business decision to discontinue research programs and operations at WL, and obtained government concurrence in 1998. The Nuclear Legacy Liabilities Program (NLLP) was established in 2006 by the Canadian Government to remediate nuclear legacy liabilities in a safe and cost effective manner, including the WL site. The NLLP is being implemented by AECL under the governance of a Natural Resources Canada (NRCan)/AECL Joint Oversight Committee (JOC). Significant progress has since been made, and the WL site currently holds the only Canadian Nuclear Safety Commission (CNSC) nuclear research site decommissioning license in Canada. The current decommissioning license is in place until the end of 2018. The present schedule planned for main campus decommissioning is 30 years (to 2037), followed by institutional control of the WMA until a National plan is implemented for the long-term management of nuclear waste. There is an impetus to advance work and complete decommissioning sooner. To accomplish this, AECL has added significant resources, reorganized and moved to a projectized environment. This presentation outlines changes made to the organization, the tools implemented to foster projectization, and the benefits and positive impacts on schedule and delivery. A revised organizational structure was implemented in two phases, starting 2011 April 1, to align WL staff with the common goal of decommissioning the site through the direction of the WL Decommissioning Project General Manager. On 2011 September 1, the second phase of the reorganization was implemented and WL Decommissioning staff was organized under five Divisions: Programs and Regulatory Compliance, General Site Services, Decommissioning Strategic Planning, Nuclear Facilities and Project Delivery. A new Mission, Vision and Objectives were developed for the project, and several productivity enhancements are being implemented. These include the use of an integrated and fully re-sourced Site Wide Schedule that is updated and reviewed at Plan-of-the-Week meetings, improved work distribution throughout the year, eliminating scheduling 'push' mentality, project scoreboards, work planning implementation, lean practices and various process improvement initiatives. A revised Strategic Plan is under development that reflects the improved project delivery capabilities. As a result of these initiatives, and a culture change towards a projectized approach, the decommissioning schedule will be advanced by approximately 10 years. (authors)

  9. Breaking down barriers, building up communities : implementing project labor agreements with targeted hiring goals

    E-Print Network [OSTI]

    Chimienti, Elizabeth Ann

    2010-01-01T23:59:59.000Z

    For decades, government and community organizations have developed strategies to provide workers historically excluded from the Building Trades with access to jobs on publicly funded construction projects. Studies of best ...

  10. Weatherization Assistance Program Technical Assistance Center

    SciTech Connect (OSTI)

    Robert Adams

    2009-01-07T23:59:59.000Z

    The following is a synopsis of the major achievements attributed to the operation of the Weatherization Assistance Program Technical Assistance Center (WAPTAC) by the National Association for State Community Services Programs (NASCSP). During the past five years, the WAPTAC has developed into the premier source for information related to operating the Weatherization Assistance Program (WAP) at the state and local levels. The services provide through WAPTAC include both virtual technical support as well as hands-on training and instruction in classroom and in the field. The WAPTAC achieved several important milestones during its operation including the establishment of a national Weatherization Day now celebrated in most states, the implementation of a comprehensive Public Information Campaign (PIC) to raise the awareness of the Program among policy makers and the public, the training of more than 150 new state managers and staff as they assume their duties in state offices around the country, and the creation and support of a major virtual information source on the Internet being accessed by thousands of staff each month. The Weatherization Assistance Program Technical Assistance Center serves the Department of Energy's (DOE) Office of Weatherization and Intergovernmental Program as a valuable training and technical assistance resource for the network of 54 direct state grantees (50 states, District of Columbia and three Native American tribes) and the network of 900 local subgrantees (comprised of community action agencies, units of local government, and other non-profit organizations). The services provided through WAPTAC focus on standardizing and improving the daily management of the WAP. Staff continually identify policies changes and best practices to help the network improve its effectiveness and enhance the benefits of the Program for the customers who receive service and the federal and private investors. The operations of WAPTAC are separated into six distinct areas: (1) Orientation for New WAP State Directors and Staff; (2) Pollution Occurrence Insurance Project; (3) Public Information Campaign; (4) State Management Training Project; (5) System for Integrating and Reviewing Technologies and Techniques; and (6) WAPTAC Services.

  11. Preparing for Project Implementation Financing Project Implementation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreakingMay 2015 < prev next > Sun Mon2015 |July 14, 2010 8 -

  12. Implementations of a Flexible Framework for Managing Geologic Sequestration Modeling Projects

    SciTech Connect (OSTI)

    White, Signe K.; Gosink, Luke J.; Sivaramakrishnan, Chandrika; Black, Gary D.; Purohit, Sumit; Bacon, Diana H.; Hou, Zhangshuan; Lin, Guang; Gorton, Ian; Bonneville, Alain

    2013-08-06T23:59:59.000Z

    Numerical simulation is a standard practice used to support designing, operating, and monitoring CO2 injection projects. Although a variety of computational tools have been developed that support the numerical simulation process, many are single-purpose or platform specific and have a prescribed workflow that may or may not be suitable for a particular project. We are developing an open-source, flexible framework named Velo that provides a knowledge management infrastructure and tools to support modeling and simulation for various types of projects in a number of scientific domains. The Geologic Sequestration Software Suite (GS3) is a version of this framework with features and tools specifically tailored for geologic sequestration studies. Because of its general nature, GS3 is being employed in a variety of ways on projects with differing goals. GS3 is being used to support the Sim-SEQ international model comparison study, by providing a collaborative framework for the modeling teams and providing tools for model comparison. Another customized deployment of GS3 has been made to support the permit application process. In this case, GS3 is being used to manage data in support of conceptual model development and provide documentation and provenance for numerical simulations. An additional customized deployment of GS3 is being created for use by the United States Environmental Protection Agency (US-EPA) to aid in the CO2 injection permit application review process in one of its regions. These use cases demonstrate GS3s flexibility, utility, and broad applicability

  13. Doing It: A Process to Screen, Design, Implement, and Evaluate Industrial Eco-Efficiency Projects

    E-Print Network [OSTI]

    Stein, J.; Robertson, C.; Klein, R. C.

    . Sources of funding may include internal budgeting, financial institutions, government grants or loans, utility rebates, and performance contractors. Design and Prototyping During the Design and Prototyping step, designers produce plans... to upgrade their internal management infonnation systems, or as training tools for future projects. ACKNOWLEDGMENTS Thanks to Barry Bennett, Gil Friend, Lynn Fryer, Fred Gordon, and others too numerous to mention here for their input. Thanks as well...

  14. ANIMAS-LA PLATA PROJECT COMPACT The state of Colorado and the state of New Mexico, in order to implement the

    E-Print Network [OSTI]

    Johnson, Eric E.

    ANIMAS-LA PLATA PROJECT COMPACT The state of Colorado and the state of New Mexico, in order to implement the operation of the Animas-La Plata federal reclamation project, Colorado-New Mexico, a proposed the following articles: ARTICLE I A. The right to store and divert water in Colorado and New Mexico from the La

  15. American Recovery and Reinvestment Act (ARRA) Federal Energy Management Program Technical Assistance Project 281 Solar Hot Water Application Assessment for U.S. Army IMCOM-Southeast Region

    SciTech Connect (OSTI)

    Russo, Bryan J.; Chvala, William D.

    2010-09-30T23:59:59.000Z

    The Energy Independence and Security Act of 2007 requires installations (EISA) to install solar systems of sufficient capacity to provide 30% of service hot water in new construction and renovations where cost-effective. However, installations are struggling with how to implement solar hot water, and while several installations are installing solar hot water on a limited basis, paybacks remain long. Pacific Northwest National Laboratory (PNNL) was tasked to address this issue to help determine how best to implement solar hot water projects. This documents discusses the results of that project.

  16. State and Regional Policy Assistance - Program Activities | Department...

    Office of Environmental Management (EM)

    Technical assistance provided to WGAWIEB by the Electricity Market Studies Group of LBNL and The Regulatory Assistance Project (RAP); and More limited technical assistance...

  17. ORISE: Policy Implementation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Policy Implementation The Oak Ridge Institute for Science and Education (ORISE) assists the U.S. Department of Energy (DOE) Office of Science in the implementation of its program...

  18. AC 2012-4150: THE INTERLACE PROJECT: EXAMINING THE BAR-RIERS TO IMPLEMENTING COLLABORATIVE, INQUIRY-BASED IN-

    E-Print Network [OSTI]

    for assisting teachers with performing engineering education and communicating robotics concepts to students, INQUIRY-BASED IN- VESTIGATIONS Dr. Morgan M. Hynes, Tufts University Morgan Hynes is a Research Assistant time working at the Sarah Greenwood K-8 school (a Boston Public School) assisting teachers

  19. Implementing Solar PV Projects on Historic Buildings and in Historic Districts

    SciTech Connect (OSTI)

    Kandt, A.; Hotchkiss, E.; Walker, A.; Buddenborg, J; Lindberg, J.

    2011-09-01T23:59:59.000Z

    Many municipalities, particularly in older communities of the United States, have a large amount of historic buildings and districts. In addition to preserving these historic assets, many municipalities have goals or legislative requirements to procure a certain amount of energy from renewable sources and to become more efficient in their energy use; often, these requirements do not exempt historic buildings. This paper details findings from a workshop held in Denver, Colorado, in June 2010 that brought together stakeholders from both the solar and historic preservation industries. Based on these findings, this paper identifies challenges and recommends solutions for developing solar photovoltaic (PV) projects on historic buildings and in historic districts in such a way as to not affect the characteristics that make a building eligible for historic status.

  20. Guidance for implementing the UMTRA Project long-term surveillance program

    SciTech Connect (OSTI)

    Not Available

    1992-09-01T23:59:59.000Z

    The US Nuclear Regulatory Commission (NRC) has issued a general license for the custody and long-term care of US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project permanent disposal sites. The purpose of this general license is to ensure that the UMTRA disposal sites will be cared for in such a manner as to protect the public health and safety and the environment upon completion of remedial actions. The general license will be in effect for a disposal site when NRC accepts the disposal site long-term surveillance plan (LTSP) that meets the requirements of 10 CFR 40.27. The site LTSP describes in detail the long-term surveillance program, including any monitoring, maintenance, and emergency measures necessary to fulfill the conditions of the general license. This guidance document provides (1) instructions for preparing the disposal site LTSPs and (2) instructions for carrying out the UMTRA Project long-term surveillance program, including any monitoring that may be required. The information provided in this document also is in accordance with the regulatory requirements set forth in 40 CFR 192. On January 5, 1985, the US Tenth Circuit Court of Appeals remanded the groundwater standards, 40 CFR 192.02. Proposed groundwater standards were issued for comment on September 24, 1987 (52 FR 3600). When the groundwater standards become final, this document will be revised, as appropriate. This document also will be updated in response to any changes to 10 CFR 40, or in response to changes in the manner in which the long-term care of the licensed disposal sites is carried out.

  1. Guidance for implementing the UMTRA Project long-term surveillance program. Final report, Revision 1

    SciTech Connect (OSTI)

    Not Available

    1992-09-01T23:59:59.000Z

    The US Nuclear Regulatory Commission (NRC) has issued a general license for the custody and long-term care of US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project permanent disposal sites. The purpose of this general license is to ensure that the UMTRA disposal sites will be cared for in such a manner as to protect the public health and safety and the environment upon completion of remedial actions. The general license will be in effect for a disposal site when NRC accepts the disposal site long-term surveillance plan (LTSP) that meets the requirements of 10 CFR 40.27. The site LTSP describes in detail the long-term surveillance program, including any monitoring, maintenance, and emergency measures necessary to fulfill the conditions of the general license. This guidance document provides (1) instructions for preparing the disposal site LTSPs and (2) instructions for carrying out the UMTRA Project long-term surveillance program, including any monitoring that may be required. The information provided in this document also is in accordance with the regulatory requirements set forth in 40 CFR 192. On January 5, 1985, the US Tenth Circuit Court of Appeals remanded the groundwater standards, 40 CFR 192.02. Proposed groundwater standards were issued for comment on September 24, 1987 (52 FR 3600). When the groundwater standards become final, this document will be revised, as appropriate. This document also will be updated in response to any changes to 10 CFR 40, or in response to changes in the manner in which the long-term care of the licensed disposal sites is carried out.

  2. Implementation of UMTRA Project Environmental Audit Action Plan status report for period ending September 30, 1992. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect (OSTI)

    Not Available

    1992-09-01T23:59:59.000Z

    This report provides the status of implementation of corrective actions for findings made in an Environmental Audit conducted by DOE Headquarters, Office of Environmental Audit, in June 1991. An Action Plan, dated December 1991, was developed to address the findings. The Action Plan was approved by DOE Headquarters, Office of Environment, Safety and Health, in July 1992. This report provides status for each activity listed in the approved Action Plan. Of 48 findings identified in the August 1991 Environmental Audit Report, 4 required no action, 5 were combined with others and actions to correct 19 are complete. Although it appears no progress has been made since the last status report was issued, UMTRA has completed 89% of the findings identified, compared to 72% identified in the last status report. The table below lists the 20 findings where actions are still underway, the current projected completion date, the organization(s) responsible for taking action on the finding, and the UMTRA Project Off ice staff member assigned responsibility for the finding.

  3. Solar Schools Assessment and Implementation Project: Financing Options for Solar Installations on K-12 Schools

    SciTech Connect (OSTI)

    Coughlin, J.; Kandt, A.

    2011-10-01T23:59:59.000Z

    This report focuses on financial options developed specifically for renewable energy and energy efficiency projects in three California public school districts. Solar energy systems installed on public schools have a number of benefits that include utility bill savings, reductions in greenhouse gas emissions (GHGs) and other toxic air contaminants, job creation, demonstrating environmental leadership, and creating learning opportunities for students. In the 2011 economic environment, the ability to generate general-fund savings as a result of reducing utility bills has become a primary motivator for school districts trying to cut costs. To achieve meaningful savings, the size of the photovoltaic (PV) systems installed (both individually on any one school and collectively across a district) becomes much more important; larger systems are required to have a material impact on savings. Larger PV systems require a significant financial commitment and financing therefore becomes a critical element in the transaction. In simple terms, school districts can use two primary types of ownership models to obtain solar installations and cost savings across a school district. The PV installations can be financed and owned directly by the districts themselves. Alternatively, there are financing structures whereby another entity, such as a solar developer or its investors, actually own and operate the PV systems on behalf of the school district. This is commonly referred to as the 'third-party ownership model.' Both methods have advantages and disadvantages that should be weighed carefully.

  4. Preliminary Audit Report on "Management Controls over the Commonwealth of Virginia's Efforts to Implement the American Recovery and Reinvestment Act Weatherization Assistance Program"

    SciTech Connect (OSTI)

    None

    2010-05-01T23:59:59.000Z

    The Department of Energy's (Department) Weatherization Assistance Program received $5 billion under the American Recovery and Reinvestment Act of 2009 (Recovery Act) to improve the energy efficiency of homes, multi-family rental units and mobile homes owned or occupied by low-income persons. Subsequently, the Department awarded a three-year Weatherization Assistance Program grant for $94 million to the Commonwealth of Virginia (Virginia). This grant provided more than a ten-fold increase in funds available to Virginia for weatherization over that authorized in Fiscal Year (FY) 2009. Corresponding to the increase in funding, the Recovery Act increased the limit on the average amount spent to weatherize a home (unit) from $2,500 to $6,500. Virginia's Department of Housing and Community Development (DHCD) administers the Recovery Act grant through 22 local community action agencies. These agencies (sub-grantees) are responsible for determining applicant eligibility, weatherizing homes, and conducting home assessments and inspections. Typical weatherization services include installing insulation; sealing ducts; tuning and repairing furnaces; and, mitigating heat loss through windows, doors and other infiltration points. Virginia plans to use its Recovery Act Weatherization funding to weatherize about 9,193 units over the life of the grant - a significant increase over the 1,475 housing units that were planned to be completed in FY 2009. Given the significant increase in funding and the demands associated with weatherizing thousands of homes, we initiated this audit to determine if Virginia had adequate safeguards in place to ensure that the Weatherization Program was managed efficiently and effectively. The State of Virginia's DHCD had not implemented financial and reporting controls needed to ensure Weatherization Program funds are spent effectively and efficiently. Specifically, DHCD had not: (1) Performed on-site financial monitoring of any of its sub-grantees under the Recovery Act; (2) Reviewed documentation supporting sub-grantee requests for reimbursements to verify the accuracy of amounts charged; (3) Periodically reconciled amounts paid to sub-grantees to the actual cost to weatherize units; (4) Maintained vehicle and equipment inventories as required by Federal regulations and state and Federal program directives; and (5) Accurately reported Weatherization Program results to the Department. Exacerbating weaknesses in DHCD's financial controls, the Department's most recent program monitoring visit to Virginia, made in 2008 before passage of the Recovery Act, did not include a required financial review. Hence, the financial control weaknesses discussed above were not detected and had not been addressed. As described in this report, these control and reporting weaknesses increase the risk that Recovery Act objectives may not be achieved and that fraud, waste or abuse can occur and not be detected in this critically important program.

  5. Energy Department Announces New Technical Assistance for Tribal...

    Office of Environmental Management (EM)

    Energy Department Announces New Technical Assistance for Tribal Clean Energy Projects Energy Department Announces New Technical Assistance for Tribal Clean Energy Projects May 20,...

  6. Custom Renewable Energy Projects

    Broader source: Energy.gov [DOE]

    Project development assistance funding is available for a variety of purposes, including grant writing, feasibility studies, or technical assistance with design, permitting, or utility interconne...

  7. Combined Heat and Power Projects

    Broader source: Energy.gov [DOE]

    DOE's CHP Technical Assistance Partnerships (CHP TAPs) have compiled a select number of CHP project profiles.

  8. Transportation Economic Assistance Program (Wisconsin)

    Broader source: Energy.gov [DOE]

    The Transportation Economic Assistance Program provides state grants to private business and local governments to improve transportation to projects improving economic conditions and creating or...

  9. Technical assistance contractor Management Plan. Final [report

    SciTech Connect (OSTI)

    Not Available

    1993-09-01T23:59:59.000Z

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins & Beckwith Agra, Inc. (SHB Agra), and Geraghty & Miller, Inc. (G&M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC`s groundwater technical breadth and depth, so G&M was brought in to augment the team`s capabilities. The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC`s management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls.

  10. American Recovery and Reinvestment Act (ARRA) Federal Energy Management Program Technical Assistance Project 224 Altus Air Force Base Solar Technologies

    SciTech Connect (OSTI)

    Russo, Bryan J.

    2010-09-30T23:59:59.000Z

    The principal goal of this project was to evaluate altus Air Force Base for building integrated silicon or thin film module photovoltaic opportunities. This report documents PNNL's efforts and documents study conclusions.

  11. USING HYPERSPECTRAL IMAGERY TO ASSIST FEDERAL FOREST MONITORING AND RESTORATION PROJECTS IN THE SOUTHERN ROCKY MOUNTAINS, COLORADO

    E-Print Network [OSTI]

    Wamser, William Kyle

    2012-12-31T23:59:59.000Z

    Hyperspectral imagery and the corresponding ability to conduct analysis below the pixel level have tremendous potential to aid in landcover monitoring. During large ecosystem restoration projects, being able to monitor ...

  12. Environment, safety, and health regulatory implementation plan

    SciTech Connect (OSTI)

    Not Available

    1993-10-21T23:59:59.000Z

    To identify, document, and maintain the Uranium Mill Tailings Remedial Action (UMTRA) Project`s environment, safety, and health (ES&H) regulatory requirements, the US Department of Energy (DOE) UMTRA Project Office tasked the Technical Assistance Contractor (TAC) to develop a regulatory operating envelope for the UMTRA Project. The system selected for managing the UMTRA regulatory operating envelope data bass is based on the Integrated Project Control/Regulatory Compliance System (IPC/RCS) developed by WASTREN, Inc. (WASTREN, 1993). The IPC/RCS is a tool used for identifying regulatory and institutional requirements and indexing them to hardware, personnel, and program systems on a project. The IPC/RCS will be customized for the UMTRA Project surface remedial action and groundwater restoration programs. The purpose of this plan is to establish the process for implementing and maintaining the UMTRA Project`s regulatory operating envelope, which involves identifying all applicable regulatory and institutional requirements and determining compliance status. The plan describes how the Project will identify ES&H regulatory requirements, analyze applicability to the UMTRA Project, and evaluate UMTRA Project compliance status.

  13. UMTRA technical assistance contractor quality assurance program plan

    SciTech Connect (OSTI)

    Not Available

    1994-10-01T23:59:59.000Z

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAc Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements.

  14. American Recovery and Reinvestment Act Federal Energy Management Program Technical Assistance Project 184 U.S. Customs and Border Protection Laboratory, Houston, Texas

    SciTech Connect (OSTI)

    Arends, J.; Sandusky, William F.

    2010-09-30T23:59:59.000Z

    This report documents the findings of an on-site energy audit of the U.S. Customs and Border Protection (CBP) Laboratory in Houston, Texas. The focus of the audit was to identify various no-cost and low-cost energy efficiency opportunities that, once implemented, would reduce electricity and gas consumption and increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the future to acquire additional energy (electric and gas) and water savings to further increase the operational efficiency of the building.

  15. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance US General Serices Administration - Project 193, John W. Bricker Federal Building, Columbus, OH

    SciTech Connect (OSTI)

    Arends, J.; Sandusky, William F.

    2010-05-31T23:59:59.000Z

    This report documents the findings from an onsite audit of the John W. Bricker Federal building located in Columbus, Ohio. The Federal landlord for this building is the General Services Administration (GSA). The focus of the audit was to identify various no-cost or low-cost energy efficiency opportunities that, once implemented, would either reduce electrical and gas consumption or increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the future to acquire additional energy (electric and gas) and water savings to further increase the operational efficiency of the building.

  16. American Recovery and Reinvestment Act ( ARRA) FEMP Technical Assistance, U.S. General Services Administration - Project 194 U.S. Custom Cargo Inspection Facility, Detroit, MI

    SciTech Connect (OSTI)

    Arends, J.; Sandusky, William F.

    2010-05-31T23:59:59.000Z

    This report documents the findings of an on-site audit of the U.S. Customs Cargo Inspection Facility (CIF) in Detroit, Michigan. The federal landlord for this building is the General Services Administration (GSA). The focus of the audit was to identify various no-cost or low-cost energy-efficiency opportunities that, once implemented, would reduce electrical and gas consumption and increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the future to acquire additional energy (electric and gas) and water savings to further increase the operational efficiency of the building.

  17. Energy Technical Assistance: Industrial Processes Program

    E-Print Network [OSTI]

    McClure, J. D.

    1980-01-01T23:59:59.000Z

    The Energy Technical Assistance Division of Texas Engineering Extension Service (TEEX) has implemented an energy conservation program to assist small industry in using energy more efficiently. This full time service, an outgrowth of the Texas A...

  18. Energy Technical Assistance: Industrial Processes Program

    E-Print Network [OSTI]

    McClure, J. D.

    1980-01-01T23:59:59.000Z

    The Energy Technical Assistance Division of Texas Engineering Extension Service (TEEX) has implemented an energy conservation program to assist small industry in using energy more efficiently. This full time service, an outgrowth of the Texas A...

  19. H2-Assisted NOx Traps: Test Cell Results Vehicle Installations

    Broader source: Energy.gov (indexed) [DOE]

    Sam Crane August 28, 2003 H 2 -Assisted NOx Traps: Test Cell Results Vehicle Installations 2 Project Objectives * Determine Advantages of H 2 Assisted NO x Trap Regeneration *...

  20. Sandia National Laboratories: New Mexico Small Business Assistance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Small Business Assistance Sandia-Atmocean Inc.'s New Mexico Small Business Assistance Project On March 13, 2014, in Computational Modeling & Simulation, Energy, News, News &...

  1. assisted training system: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Implementation of the TRAINS96 System: A Prototype MixedInitiative Planning Assistant Renewable Energy Websites Summary: The Design and Implementation of the TRAINS-96...

  2. Olkiluoto 1 and 2 - Plant efficiency improvement and lifetime extension-project (PELE) implemented during outages 2010 and 2011

    SciTech Connect (OSTI)

    Kosonen, M.; Hakola, M. [Teollisuuden Voima Oyj, F- 27160 Eurajoki (Finland)

    2012-07-01T23:59:59.000Z

    Teollisuuden Voima Oyj (TVO) is a non-listed public company founded in 1969 to produce electricity for its stakeholders. TVO is the operator of the Olkiluoto nuclear power plant. TVO follows the principle of continuous improvement in the operation and maintenance of the Olkiluoto plant units. The PELE project (Plant Efficiency Improvement and Lifetime Extension), mainly completed during the annual outages in 2010 and 2011, and forms one part of the systematic development of Olkiluoto units. TVO maintains a long-term development program that aims at systematically modernizing the plant unit systems and equipment based on the latest technology. According to the program, the Olkiluoto 1 and Olkiluoto 2 plant units are constantly renovated with the intention of keeping them safe and reliable, The aim of the modernization projects is to improve the safety, reliability, and performance of the plant units. PELE project at Olkiluoto 1 was done in 2010 and at Olkiluoto 2 in 2011. The outage length of Olkiluoto 1 was 26 d 12 h 4 min and Olkiluoto 2 outage length was 28 d 23 h 46 min. (Normal service-outage is about 14 days including refueling and refueling-outage length is about seven days. See figure 1) The PELE project consisted of several single projects collected into one for coordinated project management. Some of the main projects were as follows: - Low pressure turbines: rotor, stator vane, casing and turbine instrumentation replacement. - Replacement of Condenser Cooling Water (later called seawater pumps) pumps - Replacement of inner isolation valves on the main steam lines. - Generator and the generator cooling system replacement. - Low voltage switchgear replacement. This project will continue during future outages. PELE was a success. 100 TVO employees and 1500 subcontractor employees participated in the project. The execution of the PELE projects went extremely well during the outages. The replacement of the low pressure turbines and seawater pumps improved the efficiency of the plant units, and a power increase of nearly 20 MW was achieved at both plant units. PELE wonderfully manifests one of the strategic goals of our company; developing the competence of our in-house personnel by working in projects. (authors)

  3. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    SciTech Connect (OSTI)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01T23:59:59.000Z

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  4. Water Matters, No. 7 Page 1 and implementation of IMPs. This issue of Water

    E-Print Network [OSTI]

    Farritor, Shane

    Water Matters, No. 7 Page 1 and implementation of IMPs. This issue of Water Matters describes NRDs and stakeholders to better understand regional hydrogeology and water availability to assist with water management across Nebraska (figure 1). There are two statewide projects occurring in IWM right now

  5. Cross-Functional Project Teams Real Estate

    E-Print Network [OSTI]

    Kamat, Vineet R.

    Rigg Assistant Director Project Controls Doug Hanna University Architect Design Mary Krasny Associate

  6. Cross-Functional Project Teams Real Estate

    E-Print Network [OSTI]

    Kamat, Vineet R.

    Assistant Director Project Controls Doug Hanna University Architect University Architects Office Mary Krasny

  7. Federal Energy Management Program technical assistance case study: The Forrestal Building relighting project saves $400K annually

    SciTech Connect (OSTI)

    NONE

    1997-01-01T23:59:59.000Z

    The US Department of Energy (DOE) believes energy efficiency begins at home -- in this case the James A. Forrestal Building in Washington, D.C. Since 1969, the 1.7 million-square-foot Forrestal Building has served as DOE Headquarters. In 1989, a team of in-house energy specialists began searching for opportunities to make the Forrestal Building more energy efficient. The team, on which personnel from the Federal Energy Management Program (FEMP) served, identified lighting as an area in which energy use could be reduced substantially. A monitoring program showed that the building`s more than 34,000 1-foot by 4-foot fluorescent lighting fixtures were responsible for 33% of the building`s total annual electric energy use, which represents more than 9 million kilowatt-hours (kWh) per year. In initiating the relighting program, DOE hoped to achieve these broad goals: Reduce energy use and utility bills, and improve lighting quality by distributing the light more uniformly. Funding was also an important consideration. DOE sought financing alternatives through which the lighting retrofit is paid for without using government-appropriated capital funds. DOE cut lighting costs more than 50% and paid for the project with the money saved on energy bills.

  8. Assistant Professor Cropping Systems Specialist

    E-Print Network [OSTI]

    Veiga, Pedro Manuel Barbosa

    Assistant Professor Cropping Systems Specialist Department of Plant and Soil Sciences POSITION DESCRIPTION The Department of Plant and Soil Sciences, Oklahoma State University is seeking, implementing, and evaluating educational programs to meet the needs of producers for improving existing

  9. Project Fact Sheet Project Brief

    E-Print Network [OSTI]

    Name: Centre for Assisted Robotic Surgery Number: BESS1002b Project Champion: Professor Guang-Zong Yang of the refurbishment is to renew and expand the laboratory space for Robotic Assisted Surgery at the South Kensington Campus as par to the Hamlyn Centre for Robotic Surgery. The overall programme incorpo- rates both core

  10. Vehicle Technologies Office Merit Review 2014: EV Project: Solar...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EV Project: Solar-Assisted Charging Demo Vehicle Technologies Office Merit Review 2014: EV Project: Solar-Assisted Charging Demo Presentation given by Oak Ridge National Laboratory...

  11. Energy planning and energy efficiency assistance

    SciTech Connect (OSTI)

    Markel, L. [Electrotek Concepts, Inc., Knoxville, TN (United States)

    1995-12-31T23:59:59.000Z

    Electrotek is an engineering services company specializing in energy-related programs. Clients are most utilities, large energy users, and the U.S. Electric Power Research Institute. Electrotek has directed energy projects for the U.S. Agency for International Development and the U.S. Department of Energy in Poland and other countries of Central Europe. The objective is to assist the host country organizations to identify and implement appropriate energy efficiency and pollution reduction technologies, to transfer technical and organizational knowledge, so that further implementations are market-driven, without needed continuing foreign investment. Electrotek has worked with the Silesian Power Distribution Company to design an energy efficiency program for industrial customers that has proven to be profitable for the company and for its customers. The program has both saved energy and costs, and reduced pollution. The program is expanding to include additional customers, without needing more funding from the U.S. government.

  12. Federal Wind Energy Assistance through NREL (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2009-09-01T23:59:59.000Z

    NREL assists with wind resource assessment and development activities initiated by federal agencies to facilitate distributed renewable energy projects at federal agency sites. This brief outlines the process for requesting NREL assistance with federal wind energy projects.

  13. Federal Assistance Reporting Checklist and Instructions for RD...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for RD&D Projects Federal Assistance Reporting Checklist and Instructions for RD&D Projects DOE F 4600.2, Financial Assistance Reporting Checklist for RD and D Attachment 1,...

  14. Sustained utility implementation of photovoltaics. TEAM-UP pre-cursor project, 1994-1995, final report

    SciTech Connect (OSTI)

    Osborn, D.E.; Collier, D.; Miller, K.; Jonas, T.; Gerlach, P.

    1998-05-01T23:59:59.000Z

    Sacramento Municipal Utility District (SMUD) is a leader in utility grid-connected applications of PVs with the world`s largest distributed PV power system. SMUD is continuing its ambitious sustained, orderly development (SOD) commercialization effort of the grid-connected, utility PV market. This program us aimed at developing the experience needed to successfully integrate PV as distributed generation into the utility system, develop market and long-term business strategies and to stimulate the collaborative processes needed to accelerate the cost-reductions necessary for PV to be cost-competitive in these applications by about the year 2002. This report documents the progress made in the 1994/1995 SMUD PV Program under this contract and the PV projects partially supported by this contract.

  15. Washoe Tribe Nevada Inter-Tribal Energy Consortium Energy Organization Enhancement Project Final Report

    SciTech Connect (OSTI)

    Johnson, Jennifer [Washoe Tribe of NV and Ca

    2014-11-06T23:59:59.000Z

    The Washoe Tribe of Nevada and California was awarded funding from the Department of Energy to complete the Nevada Inter-Tribal Energy Consortium Energy Organization Enhancement Project. The main goal of the project was to enhance the capacity of the Nevada Inter-Tribal Energy Consortium (NITEC) to effectively assist tribes within Nevada to technically manage tribal energy resources and implement tribal energy projects.

  16. Air Emissions Reduction Assistance Program (Iowa) | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Provider Iowa Department of Natural Resources The State of Iowa may provide financial assistance in the form of loans andor grants to projects aimed at reducing air emissions...

  17. About Technical Assistance

    Broader source: Energy.gov [DOE]

    As technologies proceed along the development pipeline, most face major hurdles as they attempt to enter commercial markets. Our Technical Assistance program helps lower a range of institutional barriers to prepare innovative, energy-efficient technologies and energy management systems for full commercial deployment. These projects and activities address barriers that are not technical, Technology Readiness Level 9.

  18. Implementing Best Practices for Data Quality Assessment of the National Renewable Energy Laboratory's Solar Resource and Meteorological Assessment Project

    SciTech Connect (OSTI)

    Wilcox, S. M.; McCormack, P.

    2011-01-01T23:59:59.000Z

    Effective solar radiation measurements for research and economic analyses require a strict protocol for maintenance, calibration, and documentation to minimize station down-time and data corruption. The National Renewable Energy Laboratory's Concentrating Solar Power: Best Practices Handbook for the Collection and Use of Solar Resource Data (1) includes guidelines for operating a solar measure-ment station. This paper describes a suite of automated and semi-automated routines based on the best practices hand-book as developed for the National Renewable Energy La-boratory Solar Resource and Meteorological Assessment Project. These routines allow efficient inspection and data flagging to alert operators of conditions that require imme-diate attention. Although the handbook is targeted for con-centrating solar power applications, the quality-assessment procedures described are generic and should benefit many solar measurement applications. The routines use data in one-minute measurement resolution, as suggested by the handbook, but they could be modified for other time scales.

  19. Design and Implementation of a CO2 Flood Utilizing Advanced Reservoir Characterization and Horizontal Injection Wells In a Shallow Shelf Carbonate Approaching Waterflood Depletion, Class II

    SciTech Connect (OSTI)

    Wier, Don R. Chimanhusky, John S.; Czirr, Kirk L.; Hallenbeck, Larry; Gerard, Matthew G.; Dollens, Kim B.; Owen, Rex; Gaddis, Maurice; Moshell, M.K.

    2002-11-18T23:59:59.000Z

    The purpose of this project was to economically design an optimum carbon dioxide (CO2) flood for a mature waterflood nearing its economic abandonment. The original project utilized advanced reservoir characterization and CO2 horizontal injection wells as the primary methods to redevelop the South Cowden Unit (SCU). The development plans; project implementation and reservoir management techniques were to be transferred to the public domain to assist in preventing premature abandonment of similar fields.

  20. Energy Efficiency Projects: Overcoming Internal Barriers to Implementa...

    Broader source: Energy.gov (indexed) [DOE]

    discusses overcoming internal barriers to funding andor implementing energy efficiency projects. Energy Efficiency Projects: Overcoming Internal Barriers to Implementation...

  1. Recovery Act Project Stories

    Broader source: Energy.gov [DOE]

    Funded by the American Recovery and Reinvestment Act, these Federal Energy Management Program (FEMP) projects exemplify the range of technical assistance provided to federal agencies.

  2. Computer assisted consent for personal data processing

    E-Print Network [OSTI]

    Daniel Le Mtayer; Shara Monteleone

    2008-01-01T23:59:59.000Z

    suggest an implementation of these requirements developed in PRIAM 1, a multidisciplinary project involving lawyers and computer scientists.

  3. Clean Coal Projects (Virginia)

    Broader source: Energy.gov [DOE]

    This legislation directs the Virginia Air Pollution Control Board to facilitate the construction and implementation of clean coal projects by expediting the permitting process for such projects.

  4. Activities of the Oil Implementation Task Force, reporting period March--August 1991; Contracts for field projects and supporting research on enhanced oil recovery, reporting period October--December 1990

    SciTech Connect (OSTI)

    Not Available

    1991-10-01T23:59:59.000Z

    Activities of DOE's Oil Implementation Task Force for the period March--August 1991 are reviewed. Contracts for fields projects and supporting research on enhanced oil recovery are discussed, with a list of related publications given. Enhanced recovery processes covered include chemical flooding, gas displacement, thermal recovery, and microbial recovery.

  5. UMTRA Project: Environment, Safety, and Health Plan

    SciTech Connect (OSTI)

    Not Available

    1995-02-01T23:59:59.000Z

    The US Department of Energy has prepared this UMTRA Project Environment, Safety, and Health (ES and H) Plan to establish the policy, implementing requirements, and guidance for the UMTRA Project. The requirements and guidance identified in this plan are designed to provide technical direction to UMTRA Project contractors to assist in the development and implementation of their ES and H plans and programs for UMTRA Project work activities. Specific requirements set forth in this UMTRA Project ES and H Plan are intended to provide uniformity to the UMTRA Project`s ES and H programs for processing sites, disposal sites, and vicinity properties. In all cases, this UMTRA Project ES and H Plan is intended to be consistent with applicable standards and regulations and to provide guidance that is generic in nature and will allow for contractors` evaluation of site or contract-specific ES and H conditions. This plan specifies the basic ES and H requirements applicable to UMTRA Project ES and H programs and delineates responsibilities for carrying out this plan. DOE and contractor ES and H personnel are expected to exercise professional judgment and apply a graded approach when interpreting these guidelines, based on the risk of operations.

  6. Effective Community-Wide Policy Technical Assistance: The DOE/NREL Approach (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2010-11-01T23:59:59.000Z

    This document compiles lessons learned and provides a step-by-step process for implementing effective policy assistance.

  7. Performance Assessment Assistance Activities in the DOE Complex - 12325

    SciTech Connect (OSTI)

    Seitz, Roger R.; Phifer, Mark A. [Savannah River National Laboratory, Savannah River Site, Bldg 773-43A, Aiken, SC 29808 (United States); Letourneau, Martin J. [U.S. Department of Energy, EM-41 19901 Germantown Road, Germantown, MD 20874-1290 (United States)

    2012-07-01T23:59:59.000Z

    The United States Department of Energy Office of Environmental Management (DOE-EM) has established a Performance Assessment Community of Practice (PA CoP) to foster the sharing of information among performance assessment (PA) and risk assessment practitioners, regulators and oversight personnel. The general intent is to contribute to continuous improvement in the consistency, technical adequacy and quality of implementation of PAs and risk assessments around the DOE Complex. The PA CoP activities have involved commercial disposal facilities and international participants to provide a global perspective. The PA CoP has also sponsored annual technical exchanges as a means to foster improved communication and to share lessons learned from on-going modelling activities. The PA CoP encourages activities to provide programmatic and technical assistance in the form of sharing experience and lessons learned with practitioners during the development of PAs and risk assessments. This assistance complements DOE-EM reviews through the Low-Level Waste Disposal Facility Federal Review Group (LFRG) that are conducted after modelling efforts are completed. Such up-front assistance is providing additional value in terms of improving consistency and sharing of information. There has been a substantial increase in the amount of assistance being provided. The assistance has been well received by practitioners and regulators that have been involved. The paper highlights assistance and sharing of information that has been conducted in the last two years to support activities underway in support of proposed disposal facilities at Paducah, Portsmouth, and the Idaho National Laboratory and tank closure at Hanford. DOE-EM established the PA CoP to help improve the consistency and quality of implementation of modelling activities around the DOE Complex. The PA CoP has sponsored annual technical exchanges as a means to foster improved communication and to share lessons learned from ongoing modelling activities. Practitioners; project managers; oversight personnel; and regulators from United States and international facilities have participated in the three technical exchanges that have been held to date. At the working level, the PA CoP has sponsored technical assistance in support of modelling activities that are currently underway. The assistance concept provides a means to share specific experience, good practices, and lessons learned on topics of interest at a given site while the modelling is being conducted. Such up-front assistance complements the sharing of information that occurs via regular LFRG meetings and independent LFRG reviews that are conducted when the modelling effort is completed. Examples from assistance activities that have been conducted at Idaho, Paducah, Portsmouth and Hanford were highlighted in this paper. There were differences in the types of assistance provided at each site. In some cases the assistance was focused on technical support for the practitioners and management responsible for the development of the PAs. At other sites, the assistance included working with the developers and regulators/stakeholders involved in the process to help with reaching consensus on critical assumptions. Such interactions have proven to be very effective to help all parties get a chance to discuss their perspectives and better understand the different points of view. In all cases, the assistance was used as a means to share broader perspectives, experiences and lessons learned with personnel engaged in a modelling activities at a given site. The combination of technical exchanges and targeted technical assistance has provided additional means to encourage the sharing of information around the DOE Complex and globally. Feedback from practitioners, oversight personnel, regulators and stakeholders that have been involved has been overwhelmingly positive. It is believed that such sharing of information and experiences is contributing to continuous improvement in the consistency, technical adequacy, and quality of modelling activities. Alt

  8. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance U.S. Army Project 276 Renewable Resource Development on Department of Defense Bases in Alaska: Challenges and Opportunities

    SciTech Connect (OSTI)

    Warwick, William M.

    2010-09-30T23:59:59.000Z

    The potential to increase utilization of renewable energy sources among military facilities in Alaska through coordinated development and operation is the premise of this task. The US Army Pacific Command requested assistance from PNNL to help develop a more complete understanding of the context for wheeling power within Alaska, including legal and regulatory barriers that may prohibit the DOD facilities from wheeling power among various locations to optimize the development and use of renewable resources.

  9. Implementation Applications

    E-Print Network [OSTI]

    Kazhdan, Michael

    ;Outline Theory Implementation Applications Background Intuition Definition Delaunay Triangulation Shape-Dimensional Shapes #12;Outline Theory Implementation Applications Background Intuition Definition Delaunay;Outline Theory Implementation Applications Background Intuition Definition Delaunay Triangulation Shape

  10. Standard Review Plan Maintenance Program implementing procedures document

    SciTech Connect (OSTI)

    NONE

    1996-11-01T23:59:59.000Z

    The implementing Procedures Document (IPD) was developed by the Inspection Program Projects Branch, Office of Nuclear Reactor Regulation, with assistance from Pacific Northwest National Laboratory, for the Standard Review Plan Maintenance Program (SRP-MP). The SRP-MP was established to maintain the Standard Review Plan (SRP) on an on-going basis. The IPD provides guidance, including an overall approach and procedures, for SRP-MP tasks. The objective of the IPD is to ensure that modifications to SRP need to reflect current NRC requirements and guidance are identified and that a consistent methodology is used to develop and revise SRP sections.

  11. Mexico joins the venture: Joint Implementation and Greenhouse Gas Emissions

    SciTech Connect (OSTI)

    Imaz, M.; Gay, C.; Friedmann, R.; Goldberg, B.

    1998-11-01T23:59:59.000Z

    Joint Implementation (JI) and its pilot phase of Activities Implemented Jointly (AIJ) are envisioned as an economic way of reducing global emissions of greenhouse gases. This paper draws upon the Mexican experience with AIJ to identify Mexican concerns with AIJ/JI and proposed solutions to these. Three approved Mexican AIJ projects (Ilumex, Scolel Te, and Salicornia) are described in detail. The Ilurnex project promotes the use of compact fluorescent lamps in Mexican homes of the States of Jalisco and Nuevo Leon, to reduce electric demand. Scolel Te is a sustainable forest management project in Chiapas. Salicornia examines the potential for carbon sequestration with a Halophyte-based crop irrigated with saline waters in Sonora. These three projects are reviewed to clarify the issues and concerns that Mexico has with AIJ and JI and propose measures to deal with them. These initial Mexican AIJ projects show that there is a need for creation of standard project evaluation procedures, and criteria and institutions to oversee project design, selection, and implementation. Further JI development will be facilitated by national and international clarification of key issues such as additionality criteria, carbon-credit sharing, and valuation of non-GHG environmental and/or social benefits and impacts for AIJ projects. Mexico is concerned that JI funding could negatively impact official development assistance or that OECD countries will use JI to avoid taking significant GHG mitigation actions in their own countries. The lack of carbon credit trading in the AIJ stage must be removed to provide useful experience on how to share carbon credits. National or international guidelines are needed to ensure that a portion of the carbon credits is allocated to Mexico.

  12. Assisted fusion

    E-Print Network [OSTI]

    German Klbermann

    2009-10-19T23:59:59.000Z

    A model of nuclear fusion consisting of a wave packet impinging into a well located between square one dimensional barriers is treated analytically. The wave function inside the well is calculated exactly for the assisted tunneling induced by a perturbation mimicking a constant electric field with arbitrary time dependence. Conditions are found for the enhancement of fusion.

  13. Technical Assistance Application Bright Schools Program

    E-Print Network [OSTI]

    the energy cost and detailed usage information for each facility listed in Item 4 (above). Any past energy construction only: Schematic drawings (if available) 3. Project Description Type of assistance needed: Energy for proposed energy project New construction evaluation of new facility Other Discuss your proposed project

  14. FINANCIAL ASSISTANCE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy PortsmouthPaducah Project Office REQUEST FOR OFFERS for the SALE OF DEPLETED AND OFF-SPECIFICATION URANIUM HEXAFLUORIDE INVENTORIES Request for Offers Number:...

  15. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance U.S. General Services Administration Project 195 John Seiberling Federal Office Building and U.S. Courthouse, Akron, Ohio

    SciTech Connect (OSTI)

    Arends, J.; Sandusky, William F.

    2010-05-28T23:59:59.000Z

    This report documents the findings from an onsite audit of the John Seiberling Federal building located in Akron, Ohio. The Federal landlord for this building is the General Services Administration (GSA). The focus of the audit was to identify various no-cost or low-cost energy efficiency opportunities that, once implemented, would reduce in either electrical and gas consumption and increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the to acquire additional energy (electric and gas) and water savings to further increase the operational efficiency of the building.

  16. Consulting Assistance on Economic Discussion Papers

    E-Print Network [OSTI]

    Consulting Assistance on Economic Reform II Discussion Papers The objectives of the Consulting Assistance on Economic Reform (CAER II) project are to contribute to broad-based and sustainable economic, Bureau for Global Programs, Field Support and Research, Center for Economic Growth and Agricultural

  17. Instructions for use JICA's Assistance in Health

    E-Print Network [OSTI]

    Tsunogai, Urumu

    and clinical care eg, strengthen health systems including the development of human resources, facilitiesInstructions for use #12;1 JICA's Assistance in Health Ryuji MATSUNAGA International Cooperation's Assistance in Health Example of JICA Programme/Projects 2 #12;An Overview of Japan's ODA 3 #12;Japan's ODA

  18. Deputy Assistant Secretary Jack Surash's Written Statement before...

    Office of Environmental Management (EM)

    Statement before the Subcommittee on Energy and Water Development on Major System Construction Projects (March 20, 2013) Deputy Assistant Secretary Jack Surash's Written...

  19. Assistance and Contacts for Energy Savings Performance Contracts...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    offers assistance to help federal agencies develop energy savings performance contract (ESPC) projects that are financially, technically, contractually, and legally sound. Federal...

  20. Assistance and Contacts for Energy Savings Performance Contracts

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program offers assistance to help federal agencies develop energy savings performance contract (ESPC) projects that are financially, technically, contractually, and legally sound.

  1. EPA Source Reduction Assistance Grant Program | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    accepting applications for the Source Reduction Assistance Grant Program to support pollution preventionsource reduction andor resource conservation projects that reduce or...

  2. Effective Community-Wide Policy Technical Assistance: The DOE/NREL Approach (Brochure), NREL (National Renewable Energy Laboratory)

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document compiles lessons learned and provides a step-by-step process for implementing effective policy assistance.

  3. Infrastructure and Operations Improvement Project Director |...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    project risks. -Ensure that required and effective project management and control systems are developed, deployed and implemented to successfully manage and assess the project...

  4. Assistance to States on Electric Industry Issues

    SciTech Connect (OSTI)

    Glen Andersen

    2010-10-25T23:59:59.000Z

    This project seeks to educate state policymakers through a coordinated approach involving state legislatures, regulators, energy officials, and governors staffs. NCSLs activities in this project focus on educating state legislators. Major components of this proposal include technical assistance to state legislatures, briefing papers, coordination with the National Council on Electricity Policy, information assistance, coordination and outreach, meetings, and a set of transmission-related activities.

  5. New Songdo City and the value of flexibility : a case study of implementation and analysis of a mega-scale project

    E-Print Network [OSTI]

    Lee, Junho (Junho Justin)

    2008-01-01T23:59:59.000Z

    In the modern real estate industry, mega-scale developments have been a notable feature. The distinctiveness of these projects is that they are enormous in scale and thus require many years to develop. Unlike regular sized ...

  6. Activities of the Oil Implementation Task Force, December 1990--February 1991; Contracts for field projects and supporting research on enhanced oil recovery, April--June 1990

    SciTech Connect (OSTI)

    Tiedemann, H.A. (ed.) (USDOE Bartlesville Project Office, OK (USA))

    1991-03-01T23:59:59.000Z

    The Oil Implementation Task Force was appointed to implement the US DOE's new oil research program directed toward increasing domestic oil production by expanded research on near- or mid-term enhanced oil recovery methods. An added priority is to preserve access to reservoirs that have the largest potential for oil recovery, but that are threatened by the large number of wells abandoned each year. This report describes the progress of research activities in the following areas: chemical flooding; gas displacement; thermal recovery; resource assessment; microbial technology; geoscience technology; and environmental technology. (CK)

  7. AN EARLY WARNING SYSTEM FOR AMBIENT ASSISTED LIVING

    E-Print Network [OSTI]

    Karlsson, Brynjar

    AN EARLY WARNING SYSTEM FOR AMBIENT ASSISTED LIVING June 2012 Andrea Monacchi Master of Science in Computer Science #12;#12;AN EARLY WARNING SYSTEM FOR AMBIENT ASSISTED LIVING Andrea Monacchi Master ISSN 1670-8539 #12;#12;An Early Warning System for Ambient Assisted Living by Andrea Monacchi Project

  8. Automatic mapping of ASSIST applications using process algebra

    E-Print Network [OSTI]

    Benoit, Anne

    Automatic mapping of ASSIST applications using process algebra M. Aldinucci Inst. of Information Programme Project no. FP6-004265 #12;Automatic mapping of ASSIST applications using process algebra M algebra PEPA. We target applications written with the high-level environment ASSIST, since the use

  9. assisted chemical separation: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    We propose such as the ability to view flow fields and manipulate time-scales. The end result of this project will be studentsProject Team German Drazer, Assistant...

  10. Operating Reserves: Billing Implementation Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    D M I N I S T R A T I O N 2 Overview Explain the billing delay in implementing new WECC OR standards Customer outreach New project schedule Review new OR billing...

  11. Biofuel and Bioenergy implementation scenarios

    E-Print Network [OSTI]

    Biofuel and Bioenergy implementation scenarios Final report of VIEWLS WP5, modelling studies #12;Biofuel and Bioenergy implementation scenarios Final report of VIEWLS WP5, modelling studies By Andr of this project are to provide structured and clear data on the availability and performance of biofuels

  12. Activities of the Oil Implementation Task Force; Contracts for field projects and supporting research on enhanced oil recovery, July--September 1990

    SciTech Connect (OSTI)

    Tiedemann, H.A. (ed.) (USDOE Bartlesville Project Office, OK (USA))

    1991-05-01T23:59:59.000Z

    The report contains a general introduction and background to DOE's revised National Energy Strategy Advanced Oil Recovery Program and activities of the Oil Implementation Task Force; a detailed synopsis of the symposium, including technical presentations, comments and suggestions; a section of technical information on deltaic reservoirs; and appendices containing a comprehensive listing of references keyed to general deltaic and geological aspects of reservoirs and those relevant to six selected deltaic plays. Enhanced recovery processes include chemical floodings, gas displacement, thermal recovery, geoscience, and microbial recovery.

  13. UMTRA technical assistance contractor Quality Assurance Program Plan. Revision 4

    SciTech Connect (OSTI)

    Pehrson, P.

    1993-10-12T23:59:59.000Z

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAC Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements. The key to ensuring compliance with this directive is a two-step professional approach: utilize the quality system in all areas of activity, and generate a personal commitment from all personnel to provide quality service. The quality staff will be experienced, trained professionals capable of providing maximum flexibility to Project goal attainment. Such flexibility will enable the staff to be more cost effective and to further improve communication and coordination. To provide control details, this QAPP will be supplemented by approved standard operating procedures that provide requirements for performing the various TAC quality-related activities. These procedures shall describe applicable design input and document control activities and documentation.

  14. Computer Assisted Virtual Environment - CAVE

    ScienceCinema (OSTI)

    Erickson, Phillip; Podgorney, Robert; Weingartner, Shawn; Whiting, Eric

    2014-06-09T23:59:59.000Z

    Research at the Center for Advanced Energy Studies is taking on another dimension with a 3-D device known as a Computer Assisted Virtual Environment. The CAVE uses projection to display high-end computer graphics on three walls and the floor. By wearing 3-D glasses to create depth perception and holding a wand to move and rotate images, users can delve into data.

  15. An SME's Perspective on Implementing the Superior Energy Performance Program

    E-Print Network [OSTI]

    Waz, P.

    2009-01-01T23:59:59.000Z

    system assessment standards and is implementing a Management System for Energy that meets the MSE 20000:2008 standard. Pierre will describe the results of the assessments, project implementation and management system implementation....

  16. BGSU Libraries STUDENT ASSISTANT

    E-Print Network [OSTI]

    Moore, Paul A.

    BGSU Libraries STUDENT ASSISTANT EMPLOYMENT APPLICATION NAME LIBRARY EXPERIENCE: LOCATION:________________________________________________________________________ ________________________________________________________________________________________________ OTHER OFFICE/LIBRARY SKILLS

  17. Implementing Best Practices for Data Quality Assessment of the National Renewable Energy Laboratory?s Solar Resource and Meteorological Assessment Project: Preprint

    SciTech Connect (OSTI)

    Wilcox, S. M.; McCormack, P.

    2011-04-01T23:59:59.000Z

    Effective solar radiation measurements for research and economic analyses require a strict protocol for maintenance, calibration, and documentation to minimize station downtime and data corruption. The National Renewable Energy Laboratory's Concentrating Solar Power: Best Practices Handbook for the Collection and Use of Solar Resource Data includes guidelines for operating a solar measurement station. This paper describes a suite of automated and semi-automated routines based on the best practices handbook as developed for the National Renewable Energy Laboratory Solar Resource and Meteorological Assessment Project. These routines allow efficient inspection and data flagging to alert operators of conditions that require immediate attention. Although the handbook is targeted for concentrating solar power applications, the quality-assessment procedures described are generic and should benefit many solar measurement applications. The routines use data in one-minute measurement resolution, as suggested by the handbook, but they could be modified for other time scales.

  18. Executive Assistant to the Vice-President

    E-Print Network [OSTI]

    Michelson, David G.

    Administrative Assistant Murray Armstrong Administrative Assistant Tangerine Twiss Research Partnership

  19. Midwest Region Combined Heat and Power Projects

    Broader source: Energy.gov [DOE]

    DOE's CHP Technical Assistance Partnerships (CHP TAPs) have compiled a select number of combined heat and power (CHP) project profiles, which are available as Adobe Acrobat PDFs.

  20. Northwest Region Combined Heat and Power Projects

    Broader source: Energy.gov [DOE]

    DOE's Regional CHP Technical Assistance Partnerships (CHP TAPs) have compiled a select number of combined heat and power (CHP) project profiles, which are available as Adobe Acrobat PDFs.

  1. Pacific Region Combined Heat and Power Projects

    Broader source: Energy.gov [DOE]

    DOE's Regional CHP Technical Assistance Partnerships (CHP TAPs) have compiled a select number of combined heat and power (CHP) project profiles, which are available as Adobe Acrobat PDFs.

  2. Northeast Region Combined Heat and Power Projects

    Broader source: Energy.gov [DOE]

    DOE's Regional CHP Technical Assistance Partnerships (CHP TAPs) have compiled a select number of combined heat and power (CHP) project profiles, which are available as Adobe Acrobat PDFs.

  3. Anesthesiology Assistant M.Sc. Master of Science

    E-Print Network [OSTI]

    Pilyugin, Sergei S.

    and implement anesthesia care plans. Anesthesiologist Assistants work exclusively within the Anesthesia Care extensively in the delivery and maintenance of quality anesthesia care as well as advanced patient monitoring

  4. Assisting Transit Agencies with Natural Gas Bus Technologies

    SciTech Connect (OSTI)

    Not Available

    2005-04-01T23:59:59.000Z

    A 2-page fact sheet summarizing the U.S. Department of Energy Natural Gas Transit Users Group, which provides assistance to transit agencies implementing natural gas vehicles into their fleets.

  5. Procedure for matching synfuel users with potential suppliers. Appendix B. Proposed and ongoing synthetic fuel production projects

    SciTech Connect (OSTI)

    None

    1981-08-07T23:59:59.000Z

    To assist the Department of Energy, Office of Fuels Conversion (OFC), in implementing the synthetic fuel exemption under the Powerplant and Industrial Fuel Use Act (FUA) of 1978, Resource Consulting Group, Inc. (RCG), has developed a procedure for matching prospective users and producers of synthetic fuel. The matching procedure, which involves a hierarchical screening process, is designed to assist OFC in: locating a supplier for a firm that wishes to obtain a synthetic fuel exemption; determining whether the fuel supplier proposed by a petitioner is technically and economically capable of meeting the petitioner's needs; and assisting the Synthetic Fuels Corporation or a synthetic fuel supplier in evaluating potential markets for synthetic fuel production. A data base is provided in this appendix on proposed and ongoing synthetic fuel production projects to be used in applying the screening procedure. The data base encompasses a total of 212 projects in the seven production technologies.

  6. How to prepare competitive project proposals in Tempus IV

    E-Print Network [OSTI]

    ................................................................27 VI. Project Planning/ Formulation Phase.............................................................................................................56 - Project Budget or failure during the project implementation. The capacity of applicants to plan

  7. FVB Energy Inc. Technical Assistance Project

    SciTech Connect (OSTI)

    DeSteese, John G.

    2011-05-17T23:59:59.000Z

    The request made by FVB asked for advice and analysis regarding the value of recapturing the braking energy of trains operating on electric light rail transit systems. A specific request was to evaluate the concept of generating hydrogen by electrolysis. The hydrogen would, in turn, power fuel cells that could supply electric energy back into the system for train propulsion or, possibly, also to the grid. To allow quantitative assessment of the potential resource, analysis focused on operations of the SoundTransit light rail system in Seattle, Washington. An initial finding was that the full cycle efficiency of producing hydrogen as the medium for capturing and reusing train braking energy was quite low (< 20%) and, therefore, not likely to be economically attractive. As flywheel energy storage is commercially available, the balance of the analysis focused the feasibility of using this alternative on the SoundTransit system. It was found that an investment in a flywheel with a 25-kWh capacity of the type manufactured by Beacon Power Corporation (BPC) would show a positive 20-year net present value (NPV) based on the current frequency of train service. The economic attractiveness of this option would increase initially if green energy subsidies or rebates were applicable and, in the future, as the planned frequency of train service grows.

  8. EV Project: Solar-Assisted Charging Demo

    Broader source: Energy.gov (indexed) [DOE]

    occurs at night and times during the day where PV generation is greater than EV charging load Technical Accomplishments and Progress - Peak Shaving Algorithms 17 * The most...

  9. Technical Assistance Project Data Center Efficiency Opportunities...

    Broader source: Energy.gov (indexed) [DOE]

    with infrastructure upgrades * Most don't know if their center is good or bad Slide 9 LBNL feels the energy cost pain Slide 10 0 5 10 15 20 25 30 35 40 MegaW atts 2001 2003 2005...

  10. LYNN M. SOSNOSKIE Assistant Project Scientist

    E-Print Network [OSTI]

    Hanson, Brad

    under Low-Density Polyethylene and High Barrier Plastic Mulch. Weed Technology 26:54-60. 14. Sosnoskie

  11. START Renewable Energy Project Development Technical Assistance |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOrigin ofEnergy atLLC - FE DKT. 10-160-LNG - ORDER 2913||Sys.pdfEarlyProgram: Alaska

  12. START Renewable Energy Project Development Technical Assistance |

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2 OPAM615_CostNSARDevelopmental AssignmentApril 2,OCTOBER 2-3, 2012

  13. Project Management Expectations for Financial Assistance Activities |

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently20,000 RussianBy: ThomasDepartment ofThis weekSpecificThatDepartment of Energy

  14. Alternative Fuels Data Center: Project Assistance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOnItem NotEnergy,ARMForms About BecomeTechnologies |Hydrogen PrintableNaturalAbout

  15. Energy Design Assistance Project Tracker (EDAPT)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:RevisedAdvisoryStandard |in STEMEnergy CleanEnergyDepartmentEnergy Design

  16. ASSISTANT PROFESSOR (SEMI-RIGID PLASTIC PACKAGING)

    E-Print Network [OSTI]

    Stuart, Steven J.

    ASSISTANT PROFESSOR (SEMI-RIGID PLASTIC PACKAGING) IN FOOD, NUTRITION, & PACKAGING SCIENCES/rigid plastics packaging. The successful candidate will be responsible for teaching undergraduate and graduate in university teaching, experience in designing and implementing semi-rigid/rigid plastics research, a record

  17. Technical support services to assist the Office of Environmental Audit in conducting the DOE Environmental Survey and to provide technical assistance on Environmental Compliance issues. Technical progress report, August 14, 1990--February 15, 1991

    SciTech Connect (OSTI)

    NONE

    1995-07-01T23:59:59.000Z

    NUS received authorization from DOE on August 14, 1987 to provide technical support services to assist the Office of Environmental Audit (OEV) in conducting the DOE Environmental Survey and to provide technical assistance on environmental compliance issues. The overall contract is to accomplish a one-time, no-fault baseline Survey of all DOE operating facilities, and to provide technical assistance and support for the resolution of environmental compliance issues. NUS has completed the Preliminary Reports and continues to support DOE on the Prioritization and Tiger Team Assessment efforts. The project requires a broad range of environmental protection expertise, necessitating senior-level personnel as the primary project staff. Many of the tasks assigned by DOE require quick startup and performance, and several tasks may be active at any one time. The objective of the DOE Environmental Survey Program is to identify and prioritize areas of existing environmental risk at 36 DOE facilities. NUS`role is to technically assist the Office of Environmental Audit in the implementation of the Surveys.

  18. Feasibility Study --Project Full Breeze By the Wind Energy Projects in Action (WEPA) Full Breeze Project team

    E-Print Network [OSTI]

    Feasibility Study -- Project Full Breeze By the Wind Energy Projects in Action (WEPA) Full Breeze Department of Facilities approached the wind energy sub-community in the spring of 2009 to assist in a study

  19. Technology Assistance Program | Partnerships | ORNL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assistance Program SHARE Technology Assistance Program Electronics Research Assistance is available for small business licensees of ORNL technologies to leverage ORNL's expertise...

  20. Comments from Google Inc. on DOE Request for Information-Implementing...

    Office of Environmental Management (EM)

    system. We stand ready to assist the Department as it works with the Federal Communications Commission (FCC) and other agencies on implementation of the National Broadband...

  1. Cloudnet Project

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Hogan, Robin

    Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

  2. Information Technology Project Execution Model Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-04-16T23:59:59.000Z

    The guide was developed in support of DOE O 415.1 to assist IT Program and Project Managers in effectively managing and applying sound project management to IT.

  3. Information Technology Project Execution Model Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-07-17T23:59:59.000Z

    The guide was developed in support of DOE O 415.1 to assist IT Program and Project Managers in effectively managing and applying sound project management to IT. Does not cancel other directives.

  4. Regulator Interface Strategies Implemented at the Y-12 National Security Complex Old Salvage Yard Soils Remediation Project, Oak Ridge, TN - 12162

    SciTech Connect (OSTI)

    Albrecht, Linda [Alliant Corporation (United States); Wilkerson, Laura; Skinner, Ralph [US DOE-ORO EM (United States); Birchfield, Joseph W. III [Link Technologies (United States)

    2012-07-01T23:59:59.000Z

    The Oak Ridge Y-12 National Security Complex housed an area known as the Old Salvage Yard (OSY) that was approximately 7 acres. The OSY was used as an area for the accumulation, processing and storage of scrap metal and equipment from Y-12 operations extending from 1968 until 2009. Areas in the northern sections of OSY also have been used for the storage of used oils containing solvents and the accumulation and recycling or de-heading and crushing of 55-gal metal drums. Scrap metal operations historically involved the accumulation, sorting, storage, public sale or disposal of scrap metal and equipment. Non-containerised storage of scrap metal was routine until 1995 when scrap metal received at OSY was placed in B-24 and B-25 boxes. Under the American Recovery and Reinvestment Act (ARRA), approximately 26,759 cubic meters of scrap metal and debris were removed and disposed at both on and off-site disposal facilities including the on-site, Oak Ridge Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) landfill in 2010 and 2011. This removal action was performed in accordance with a CERCLA Record of Decision (ROD) and a close working relationship with both the U.S. Environmental Protection Agency (EPA) Region IV and Tennessee Department of Environment and Conservation (TDEC). Due to efficiencies and the excellent cooperative relationship forged with EPA Region IV and TDEC for Y-12 ARRA Cleanup Projects, a surplus of funding was available for additional remediation work that was completed in fiscal year (FY) 2011. The underlying OSY soils were targeted for characterization and potential remediation. To expedite these important activities, the U.S. Department of Energy Oak Ridge Environmental Management partnered with the regulators during detailed planning sessions through a variety of means to quickly and efficiently characterize and pinpoint areas requiring remediation according to previous ROD commitments. Data Quality Objectives (DQOs), data-sharing, real-time characterization reporting, surface and groundwater modeling and other interface planning activities were utilized to help facilitate and complete characterization and remediation activities. As a result of these strategies, the surgical extraction of one contiguous area of soil approximately 354 cubic meters is planned for FY12. The strategies discussed resulted in a major reduction of footprint remediation (i.e., 2.8% of the original estimate) which was originally estimated at over 26,759 cubic meters. The original estimate was developed using historical data collected at various times over the period of 20 years. By leveraging a hybrid sampling approach that involved both statistically-based and biased sampling locations, the area of contamination was significantly reduced resulting in both a compliant remedial design that is cost effective while mitigating a principle threat sources to surface and groundwater at the Y-12 plant. One remedial action boundary of 354 cubic meters was verified in the northern section of the Western OSY area known as the old drum de-header station for VOCs. The original estimate for disposal was in excess of 26,759 cubic meters. This area is scheduled for waste characterization and profile development in the first half of fiscal year 2012. The anticipated disposal facility is an on-site Oak Ridge CERCLA disposal landfill known as the Environmental Management Waste Management Facility (EMWMF). By utilizing the careful strategic planning, field-based screening and close cooperation of regulatory stakeholders as detailed in this paper, the total area of soil requiring remedial action within the Y-12 OSY footprint was 354 cubic meters or 2.8% of the original planned estimate. A potential waste reduction of 97.2% was realized over the original planned estimate for OSY Soils. Significant cost savings were achieved by - Minimizing the footprint of the remedial action; - Confirmatory analysis of soils instead of use of historical sampling results for waste profile development; - Targeting traditional laboratory analy

  5. Extension Assistant Professor in Forestry POSITION: The Rubenstein School of Environment and Natural Resources (RSENR) and the

    E-Print Network [OSTI]

    Mazzotti, Frank

    Extension Assistant Professor in Forestry POSITION: The Rubenstein School of Environment-time, 12-month, non- tenure track Extension Assistant Professor in forestry. We seek a person, state forestry personnel, and citizens to support the analysis, adoption, implementation and evaluation

  6. BMDO: New Mexico Technology Transfer Demonstration Project. Interim final report

    SciTech Connect (OSTI)

    Not Available

    1993-11-01T23:59:59.000Z

    The BMDO-New Mexico Technology Transfer Demonstration Project(BMDO-NM) was a collaborative effort among the national laboratories to identify and evaluate the commercial potential of selected SDI-funded technologies. The project was funded by BMDO (formerly known as the Strategic Defense Initiative Office or SDIO), the Technology Enterprise Division (NM-TED) of the NM Economic Development Division, and the three National Laboratories. The project was managed and supervised by SAGE Management Partners of Albuquerque, and project funding was administered through the University of New Mexico. The BMDO-NM Demonstration Project focused on the development of a process to assist technology developers in the evaluation of selected BMDO technology programs so that commercialization decisions can be made in an accelerated manner. The project brought together BMDO, the NM-TED, the University of New Mexico, and three New Mexico Federal laboratories -- Los Alamos (DOE), Phillips (DOD) and Sandia (DOE). Each national laboratory actively participated throughout the project through its technology transfer offices. New Mexico was selected as the site for the Demonstration Program because of its three national and federal research laboratories engaged in BMDO programs, and the existing relationship among state govemment, the labs, universities and local economic development and business assistance organizations. Subsequent Commercialization and Implementation phases for the selected technologies from LANL and SNL were completed by SAGE and the Project Team. Funding for those phases was provided by the individual labs as well as BMDO and NM-TED in kind services. NM-TED played a proactive role in this New Mexico partnership. Its mandate is to promote technology-based economic development, with a commitment to facilitate the use of technology by industry and business statewide. TED assumed the role of program manager and executing agent for BMDO in this demonstration project.

  7. Southern Region Watershed Management Project

    E-Print Network [OSTI]

    Coordinators and the organization, management and activities of the Southern Region Water Quality Planning1 Southern Region Watershed Management Project September 15, 2000 to September 14, 2005 Terminal responding to water quality and conservation issues with educational assistance, technology development

  8. Enforcement Project Management Handbook. Directive

    SciTech Connect (OSTI)

    Not Available

    1991-01-01T23:59:59.000Z

    The handbook has been prepared as a basic reference and training manual to assist RPMs (Remedial Project Managers) and OSCs (On-Scene Coordinators) in planning, negotiating, and managing various enforcement actions.

  9. Implementing Energy Efficiency in Wastewater to Reduce Costs

    E-Print Network [OSTI]

    Cantwell, J. C.

    2008-01-01T23:59:59.000Z

    and assessed many municipal and industrial wastewater systems across the state, identified opportunities to save energy and assisted in implementing energy efficiency modifications without adversely impacting the quality of the treatment system...

  10. Pollution prevention opportunity assessment approach, training, and technical assistance for DOE contractors. FY 1995 report

    SciTech Connect (OSTI)

    Pemberton, S.

    1996-02-01T23:59:59.000Z

    The Department of Energy and its contractors are faced with environmental concerns and large waste management costs. Federal legislation and DOE Orders require sites to develop waste minimization/pollution prevention programs. In response to these requirements, the Kansas City Plant developed a pollution prevention tool called a pollution prevention opportunity assessment (PPOA). Pilot assessments resulted in the development of a graded approach to reduce the amount of effort required for activities that utilized nonhazardous and/or low-volume waste streams. The project`s objectives in FY95 were to validate DOE`s PPOA Graded Approach methodology, provide PPOA training and technical assistance to interested DOE personnel and DOE contractors, enhance the methodology with energy analysis and tools for environmental restoration activities, implement a DOE-wide PPOA database, and provide support to DOE EM-334 in the completion of a report which estimates the future potential for pollution prevention and waste minimization in the DOE complex.

  11. BPA Transmission Commercial Project Roadmap

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Commercial Project Roadmap 15-Minute Scheduling Dynamic Transfer Program NT Redispatch WECC-Bal- 002 ST Comp & Preemption ST ATC Method. PCM Monthlyweekly Implementation PCM...

  12. Combining In-Situ Buffer-Layer-Assisted-Growth with Scanning...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Capability Development Proposals Combining In Situ Buffer-Layer-Assisted-Growth with Scanning Probe Microscopy for Formation and Study of Supported Model Catalysts Project start...

  13. Environmental Restoration Program pollution prevention checklist guide for the feasibility study project phase

    SciTech Connect (OSTI)

    Not Available

    1993-09-01T23:59:59.000Z

    Feasibility studies (FS) determine what remedial alternatives are presented to regulators for site cleanup. A key consideration in this process is the waste to be generated. Minimizing the volume and toxicity of this waste will ultimately contribute to the selection of the best remedial option. The purpose of this checklist guide is to assist the user in incorporating pollution prevention/waste minimization (PP/WM) in all FS phase projects of the Environmental Restoration (ER) Program. This guide will help users document PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to assist users with implementing and evaluating waste reduction. Users can then establish numerical performance measures to measure progress in planning, training, self-assessments, field implementation, documentation, and technology transfer. Cost savings result as users train and assess themselves and perform preliminary waste assessments.

  14. POSITION DESCRIPTION ASSISTANT DIRECTOR FOR BUSINESS SERVICES Position Summary

    E-Print Network [OSTI]

    Acton, Scott

    annually), financial reporting and human resource management. Conducts financial analysis and assists resource activities. Set clear staff expectations and provide direction using SMART goals and LEAD, enrollment data, operating and capital budgets, and 10 year financial projections, this position

  15. assisted tomography romicat: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    principles behind Doppler tomography, including a comparison of the relative merits of maximum entropy regularisation versus filtered back-projection for implementing the...

  16. Funding Solar Projects at Federal Agencies: Mechanisms and Selection Criteria (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2012-03-01T23:59:59.000Z

    Implementing solar energy projects at federal facilities is a process. The project planning phase of the process includes determining goals, building a team, determining site feasibility and selecting the appropriate project funding tool. This fact sheet gives practical guidance to assist decision-makers with understanding and selecting the funding tool that would best address their site goals. Because project funding tools are complex, federal agencies should seek project assistance before making final decisions. High capital requirements combined with limits on federal agency energy contracts create challenges for funding solar projects. Solar developers typically require long-term contracts (15-20) years to spread out the initial investment and to enable payments similar to conventional utility bill payments. In the private sector, 20-year contracts have been developed, vetted, and accepted, but the General Services Administration (GSA) contract authority (federal acquisition regulation [FAR] part 41) typically limits contract terms to 10 years. Payments on shorter-term contracts make solar economically unattractive compared with conventional generation. However, in several instances, the federal sector has utilized innovative funding tools that allow long-term contracts or has created a project package that is economically attractive within a shorter contract term.

  17. Solar Schools Assessment and Implementation Project: Financing...

    Broader source: Energy.gov (indexed) [DOE]

    the annual solar resource data for different latitudes. 5 To maximize the annual energy production at a location of 40 north latitude, the optimal tilt varies from 30...

  18. NEXT GENERATION NUCLEAR PLANT PROJECT IMPLEMENTATION STRATEGY

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    include steam turbine generators, steam turbine mechanical drives, process steam, process heat exchangers and reactors, district energy systems, and thermal desalination processes....

  19. Project title Implementation of a Hypersetset language

    E-Print Network [OSTI]

    Sazonov, Vladimir

    ) is represented in a computer as a system of equations, as above or as a di­ rected edge labelled graph Thus:' #1;­terms ::= set­variables x; y; : : : j fa 1 ; : : : an g j [ft(x) : x2a&'(x)g where a; a i

  20. Financing Project Implementation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the YouTube|6721Energy 3_adv_battery.pdfFerrinMarket Segments Financing Program

  1. April 14, 2014 Page 1 of 2 Application for a University Research Assistant Appointment

    E-Print Network [OSTI]

    . Annual Budget *Please list projects from eligible funding sources that the University Research AssistantApril 14, 2014 Page 1 of 2 Application for a University Research Assistant Appointment Please complete this application form only for the proposal to create a University Research Assistant appointment

  2. Assistance Focus: Africa (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2014-12-01T23:59:59.000Z

    The Clean Energy Solutions Center Ask an Expert service connects governments seeking policy information and advice with one of more than 30 global policy experts who can provide reliable and unbiased quick-response advice and information. The service is available at no cost to government agency representatives from any country and the technical institutes assisting them. This publication presents summaries of assistance provided to African governments, including the benefits of that assistance.

  3. Monica Sasse Executive Assistant

    E-Print Network [OSTI]

    Vaswani, Namrata

    Swenson, Natalie Bryant, Allie Rowe Student Recruiting Sadie Johnson, Susie DeMoss Deb Dewall Assistant Institute Diane Meyer Pre-award Services Engineering Research Institute Engineering '("#)*(+#,)!-$.)/010

  4. Administrative Business Assistant

    E-Print Network [OSTI]

    Rock, Chris

    Center Marketing Raider Welcome Tech Activities Board Town & Gown BUSINESS OFFICE Associate Director Station Chief Financial O cer & Vice President for Administration and Finance (Clark) Interim Assistant

  5. DOE Technical Assistance Program

    Broader source: Energy.gov (indexed) [DOE]

    Designing Effective Residential Retrofit Programs eere.energy.gov The Parker Ranch installation in Hawaii DOE Technical Assistance Program Quality Assurance for Residential...

  6. Radiological Assistance Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1992-04-10T23:59:59.000Z

    To establish Department of Energy (DOE) policy, procedures, authorities, and responsibilities for its Radiological Assistance Program. Canceled by DOE O 153.1.

  7. Brownfield Assistance Program (Delaware)

    Broader source: Energy.gov [DOE]

    The Brownfield Assistance Program, administrated by the Delaware Economic Development Office (DEDO) and funded from Delaware Strategic Fund, provides matching grants to owners and developers to...

  8. Design and implementation of wavescope storage manager and access scheduler

    E-Print Network [OSTI]

    Smith, Jeremy Elliot

    2010-01-01T23:59:59.000Z

    In this thesis, I designed, implemented, and analyzed the performance of an optimized storage manager for the Wavescope project. In doing this, I implemented an importation system that converts CENSAM data into a format ...

  9. Crystal ball planning for analytics implementation in Singapore

    E-Print Network [OSTI]

    Fang, Cong, Ph.D. California State University, Los Angeles

    2014-01-01T23:59:59.000Z

    Amgen is building a new drug substance manufacturing site in Singapore (ASM). This project identified and mitigated the risks associated with implementing analytical technologies to facilitate the design and implementation ...

  10. Critical Success Factors In Implementing SAP ERP Software

    E-Print Network [OSTI]

    Bhagwani, Anil

    2009-12-18T23:59:59.000Z

    This project gives an overview of the Systems Applications and Products in Data Processing (SAP) Enterprise Resource Planning (ERP) implementation roadmap and tools that make up a complete implementation method to allow any organization to plan...

  11. Implementing Document Imaging at Western Revised 2012-04

    E-Print Network [OSTI]

    Lennard, William N.

    application. Review the "Document Imaging Project Application" to identify and address records management management services for source documents (i.e., paper records), including storage or disposal. Provide records management assistance in managing electronic data, including security, access and retention

  12. Mid-Atlantic Region Combined Heat and Power Projects

    Broader source: Energy.gov [DOE]

    DOE's CHP Technical Assistance Partnerships (CHP TAPs) have compiled a select number of combined heat and power (CHP) project profiles, which are available as Adobe Acrobat PDFs.

  13. Developing Renewable Energy Projects Larger Than 10 MWs at Federal...

    Broader source: Energy.gov (indexed) [DOE]

    Guide helps agency personnel navigate the complexities of developing large-scale renewable energy projects and assists them in attracting the necessary private capital to complete...

  14. RDS operations manualField implementation

    E-Print Network [OSTI]

    Mullins, Dyche

    for trainings and TA. #12;RDS operations manual IBBS Toolbox 227 Women's Health Monitoring Survey fieldRDS operations manualField implementation #12;RDS operations manual 226 IBBS Toolbox RDS operations manual The RDS operations manual is designed to guide project staff during the implementation of RDS

  15. DOE Handbook: Implementing Activity-level Work Planning & Control...

    Office of Environmental Management (EM)

    Nuclear Facilities DOE Handbook: Implementing Activity-level Work Planning & Control at Nuclear Facilities May 16, 2013 Presenter: James Winter, NA-00-10 Topics Covered: Project...

  16. COANDA-ASSISTED SPRAY MANIPULATION IMPLEMENTATION TO PLASMA SPRAY

    E-Print Network [OSTI]

    Smith, Barton L.

    speed rotation on a vectored jet. A 2-piece CSM collar was retrotted to a Praxair SG-100 plasma spray

  17. Gain the most business value from implementing IBM Optim

    E-Print Network [OSTI]

    Services professionals Gain comprehensive project planning and execution, product education and on guide your decommissioning project. Optim makes decommissioning easier and safer by providing professionals for rapid implementation and reliable support. IBM Software Lab Services can help you gain

  18. Mexico Small Business Assistance fest

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    celebrate success at New Mexico Small Business Assistance fest April 4, 2011 LOS ALAMOS, New Mexico, April 4, 2011-The New Mexico Small Business Assistance (NMSBA) program is...

  19. Lac Courte Oreilles Energy Analysis Project

    SciTech Connect (OSTI)

    Leslie Isham; Denise Johnson

    2009-04-01T23:59:59.000Z

    The Lac Courte Oreilles Tribe applied for first step funding in 2007 and was awarded in October of that year. We wanted to perform an audit to begin fulfilling two commitments we made to our membership and resolutions that we adopted. One was the Kyoto Protocol and reduce our carbon emissions by 25% and to produce 25% of our energy by sustainable means. To complete these goals we needed to begin with first assessing what our carbon emissions are and begin taking the steps to conserve on the energy we currently use. The First Step Grant gave us the opportunity to do this. Upon funding the Energy Project was formed under the umbrella of the LCO Public Works Department and Denise Johnson was hired as the coordinator. She quickly began fulfilling the objectives of the project. Denise began by contact the LCO College and hiring interns who were able to go to each Tribal entity and perform line logging to read and document the energy used for each electrical appliance. Data was also gathered for one full year from each entity for all their utility bills (gasoline, electric, natural gas, fuel oil, etc.). Relationships were formed with the Green Team and other Green Committees in the area that could assist us in this undertaking. The Energy Task Force was of great assistance as well recommending other committees and guidance to completing our project. The data was gathered, compiled and placed into spreadsheets that would be understandable for anyone who didn't have a background in Renewable Resources. While gathering the data Denise was also looking for ways to conserve energy usage, policies changes to implement and any possible viable renewable energy resources. Changes in the social behaviors of our members and employees will require further education by workshops, energy fairs, etc.. This will be looked into and done in coordination with our schools. The renewable resources seem most feasible are wind resources as well as Bio Mass both of which need further assessment and funding to do so will be sought. While we already are in ownership of a Hydro Dam it is currently not functioning to its full capacity we are seeking operation and maintenance firm proposals and funding sources. One of our biggest accomplishment this project gave us was our total Carbon Emissions 9989.45 tons, this will be the number that we will use to base our reductions from. It will help us achieve our goals we have set for ourselves in achieving the Kyoto Protocol and saving our Earth for our future generations. Another major accomplishment and lesson learned is we need to educate ourselves and our people on how to conserve energy to both impact the environment and our own budgets. The Lac Courte Oreilles (LCO) Energy Analysis Project will perform an energy audit to gather information on the Tribe's energy usage and determine the carbon emissions. By performing the audit we will be able to identify areas where conservation efforts are most viable and recommend policies that can be implemented. These steps will enable LCO to begin achieving the goals that have been set by the Tribal Governing Board and adopted through resolutions. The goals are to reduce emissions by 25% and to produce 25% of its energy using sustainable sources. The project objectives were very definitive to assist the Tribe in achieving its goals; reducing carbon emissions and obtaining a sustainable source of energy. The following were the outlined objectives: (1) Coordinate LCO's current and future conservation and renewable energy projects; (2) Establish working relationships with outside entities to share information and collaborate on future projects; (3) Complete energy audit and analyze LCO's energy load and carbon emissions; (4) Identify policy changes, education programs and conservation efforts which are appropriate for the LCO Reservation; and (5) Create a plan to identify the most cost effective renewable energy options for LCO.

  20. Technical Assistance Guide: Working with DOE National Laboratories (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2012-07-01T23:59:59.000Z

    A fact sheet that provides an overview of FEMP's technical assistance through the Department of Energy's National Laboratories. The Federal Energy Management Program (FEMP) facilitates the Federal Government's implementation of sound, cost-effective energy management and investment practices to enhance the nation's energy security and environmental stewardship. To advance that mission, FEMP fosters collaboration between Federal agencies and U.S. Department of Energy (DOE) national laboratories. This guide outlines technical assistance capabilities and expertise at DOE national laboratories. Any laboratory assistance must be in accordance with Federal Acquisition Regulation (FAR) Subpart 35.017 requirements and the laboratory's designation as Federal Funded Research and Development Center (FFRDC) facilities.

  1. Pecos River Ecosystem Monitoring Project

    E-Print Network [OSTI]

    McDonald, A.; Hart, C.

    2004-01-01T23:59:59.000Z

    TR- 272 2004 Pecos River Ecosystem Monitoring Project C. Hart A. McDonald Texas Water Resources Institute Texas A&M University - 146 - 2003 Pecos River Ecosystem Monitoring Project... Charles R. Hart, Extension Range Specialist, Fort Stockton Alyson McDonald, Extension Assistant Hydrology, Fort Stockton SUMMARY The Pecos River Ecosystem Project is attempting to minimize the negative impacts of saltcedar on the river ecosystem...

  2. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Riddle, Donna L.

    2007-05-03T23:59:59.000Z

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, Quality Assurance Requirements, ANSI/ASQC E4-2004, Quality Systems for Environmental Data and Technology Programs Requirements with Guidance for Use, and ISO 14001-2004, Environmental Management Systems, have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, Quality Assurance Program, identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, QA Program Implementation, identifies the TAC organizations that have responsibility for implementing the QA program requirements; and Appendix C of the QA Manual provides comparison tables that identify where the requirements of other standards are addressed in the QA Manual.

  3. Public participation in UMTRA Project program management

    SciTech Connect (OSTI)

    Majors, M.J.; Ulland, L.M. [Weston (Roy F.), Inc., Albuquerque, NM (United States)

    1993-12-31T23:59:59.000Z

    Innovative techniques for overcoming barriers to public participation on the US Department of Energy`s Uranium Mill Tailings Remedial Action (UMTRA) Project have led to improved communications with stakeholders at project sites and improved communications within the project. On the UMTRA Project, it`s been shown that an effective public participation program is an essential element to successful project implementation.

  4. UMTRA Project Office Records Management Plan

    SciTech Connect (OSTI)

    Not Available

    1993-06-01T23:59:59.000Z

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office maintains two distinct records handling areas. One of the areas is maintained by a Technical Assistance Contractor (TAC), and is referred to as the UMTRA Project Document Control Center (UPDCC). The UPDCC manages all UMTRA records except those dealing with contracts, personnel, budgeting, finance, and any other documents which are of a purely administrative nature. The second area, the UMTRA Project Administrative Files Collection (UPAFC), contains all those records listed above that are not managed by the UPDCC. This Records Management Plan (RMP) for the UPAFC will be the framework for identifying the elements and activities that relate to the management and operational aspects involved in the handling of UPAFC. Guidelines for the program will be obtained from US Department of Energy (DOE) Orders. DOE Orders implement the guidelines issued by the National Archives and Records Administration (NARA), the final authority for records management. The RMP will address the life cycle of records, including their creation, maintenance, use, and disposition.

  5. Knowledge Assisted Visualization Knowledge-assisted visualization of seismic data

    E-Print Network [OSTI]

    for knowledge-assisted annotation and computer-assisted interpretation of seismic data for oil and gas, using seismic interpretation, is performed that makes it fit very naturally into the paradigmKnowledge Assisted Visualization Knowledge-assisted visualization of seismic data Daniel Patel a

  6. DOE Technical Assistance Program

    Broader source: Energy.gov (indexed) [DOE]

    energy management, and conservation strategies * Green building technologies * Building codes Program Design and Implementation * Policy and program development * Coordinating...

  7. Assisting Difficult Calving

    E-Print Network [OSTI]

    Faries Jr., Floron C.

    2006-12-20T23:59:59.000Z

    Calving difficulty is frequently caused by disproportionate size--the calf is too big for the birth canal. This publication discusses the stages of labor, how to assist in delivery and what to do after the delivery of a calf....

  8. 9003: Biorefinery Assistance Program

    Broader source: Energy.gov [DOE]

    Breakout Session 1DBuilding Market Confidence and Understanding I: Integrated Biorefinery (Lessons Learned and Best Practices) 9003: Biorefinery Assistance Program Chris Cassidy, National Business Renewable Energy Advisor, U.S. Department of Agriculture

  9. DOE Technical Assistance Program

    Broader source: Energy.gov (indexed) [DOE]

    Solid-State Solutions for Municipal Lighting: What You'll Need to Know eere.energy.gov The Parker Ranch installation in Hawaii DOE Technical Assistance Program Solid-State...

  10. Extension of the Phoenix/City of Colorado Springs solar-assisted heat-pump project. Technical progress report No. 18, sixth quarterly report, 1 October 1980-31 January 1981

    SciTech Connect (OSTI)

    Not Available

    1981-02-03T23:59:59.000Z

    Three gas-driven heat pumps are being considered, which are a Wisconsin engine drive heat pump, a Stirling engine drive heat pump, and a gas turbine drive heat pump. Also considered is an electric driven heat pump. Cost effectiveness of both the electric driven and gas fired solar-assisted heat pumps is demonstrated by comparing the present value of the system over its 20 year life with the present value of the fuel saved in Denver and Colorado Springs. The opinions of the local electric utilities for both cities and the natural gas pipeline company are briefly discussed. (LEW)

  11. Dr. Krisellen Maloney Assistant Dean for

    E-Print Network [OSTI]

    Dodla, Ramana

    Assistant I Esmeralda Huerta Vacant Library Services Assistant I Timothy Lefkowitz Vacant Library Services

  12. Fast Charging Electric Vehicle Research & Development Project

    SciTech Connect (OSTI)

    Heny, Michael

    2014-03-31T23:59:59.000Z

    The research and development project supported the engineering, design and implementation of onroad Electric Vehicle (EV) charging technologies. It included development of potential solutions for DC fast chargers (DCFC) capable of converting high voltage AC power to the DC power required by EVs. Additional development evaluated solutions related to the packaging of power electronic components and enclosure design, as well as for the design and evaluation of EV charging stations. Research compared different charging technologies to identify optimum applications in a municipal fleet. This project collected EV usage data and generated a report demonstrating that EVs, when supported by adequate charging infrastructure, are capable of replacing traditional internal combustion vehicles in many municipal applications. The projects period of performance has demonstrated various methods of incorporating EVs into a municipal environment, and has identified three general categories for EV applications: ? Short Commute: Defined as EVs performing in limited duration, routine commutes. ? Long Commute: Defined as tasks that require EVs to operate in longer daily mileage patterns. ? Critical Needs: Defined as the need for EVs to be ready at every moment for indefinite periods. Together, the City of Charlottesville, VA (the City) and Aker Wade Power Technologies, LLC (Aker Wade) concluded that the EV has a viable position in many municipal fleets but with limited recommendation for use in Critical Needs applications such as Police fleets. The report also documented that, compared to internal combustion vehicles, BEVs have lower vehiclerelated greenhouse gas (GHG) emissions and contribute to a reduction of air pollution in urban areas. The enhanced integration of EVs in a municipal fleet can result in reduced demand for imported oil and reduced municipal operating costs. The conclusions indicated in the projects Engineering Report (see Attachment A) are intended to assist future implementation of electric vehicle technology. They are based on the cited research and on the empirical data collected and presented. The report is not expected to represent the entire operating conditions of any of the equipment under consideration within this project, and tested equipment may operate differently under other conditions.

  13. Quality Assurance Guide for Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-06-27T23:59:59.000Z

    This Guide provides acceptable approaches for implementing the Quality Assurance requirements and criteria of DOE O 413.3A related to the development and implementation of a Quality Assurance Program for the project. No cancellations.

  14. A cost benefit analysis of employee assistance programs and health promotion programs

    E-Print Network [OSTI]

    Sykora, Ellen M

    2013-02-22T23:59:59.000Z

    For many years business has been searching for ways to make companies more profitable. Some programs that many businesses have implemented in order to increase profits are Employee Assistance Programs (EAPs) and Health Promotion Programs (HPPs...

  15. Preparing for Project Implementation Motivating Employees to Implement Projects, June 9, 2010

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreakingMay 2015 < prev next > Sun Mon2015 |July 14, 2010 8 -September 8,

  16. Trust-Building in the Construction Project Delivery Process: A Relational Lookahead Tool for Managing Trust

    E-Print Network [OSTI]

    Smith, James Packer

    2013-08-01T23:59:59.000Z

    framework, this project uses a mixed methods approach to develop and test a tool designed to assist in the management of trust levels between construction project participants. This project lays the groundwork for additional research into trust...

  17. South Dakota Geothermal Commercialization Project. Final report, July 1979-October 1985

    SciTech Connect (OSTI)

    Wegman, S.

    1985-01-01T23:59:59.000Z

    This report describes the activities of the South Dakota Energy Office in providing technical assistance, planning, and commercialization projects for geothermal energy. Projects included geothermal prospect identification, area development plans, and active demonstration/commercialization projects. (ACR)

  18. Technical Assistance to Developers

    SciTech Connect (OSTI)

    Rockward, Tommy [Los Alamos National Laboratory; Borup, Rodney L. [Los Alamos National Laboratory; Garzon, Fernando H. [Los Alamos National Laboratory; Mukundan, Rangachary [Los Alamos National Laboratory; Spernjak, Dusan [Los Alamos National Laboratory

    2012-07-17T23:59:59.000Z

    This task supports the allowance of technical assistance to fuel-cell component and system developers as directed by the DOE. This task includes testing of novel materials and participation in the further development and validation of single cell test protocols. This task also covers technical assistance to DOE Working Groups, the U.S. Council for Automotive Research (USCAR) and the USCAR/DOE Driving Research and Innovation for Vehicle efficiency and Energy sustainability (U.S. Drive) Fuel Cell Technology Team. Assistance includes technical validation of new fuel cell materials and methods, single cell fuel cell testing to support the development of targets and test protocols, and regular advisory participation in other working groups and reviews. This assistance is made available to PEM fuel cell developers by request and DOE Approval. The objectives are to: (1) Support technically, as directed by DOE, fuel cell component and system developers; (2) Assess fuel cell materials and components and give feedback to developers; (3) Assist the DOE Durability Working Group with the development of various new material durability Testing protocols; and (4) Provide support to the U.S. Council for Automotive Research (USCAR) and the USCAR/DOE Fuel Cell Technology Team. FY2012 specific technical objectives are: (1) Evaluate novel MPL materials; (2) Develop of startup/ shutdown protocol; (3) Test the impact of hydrophobic treatment on graphite bi-polar plates; (4) Perform complete diagnostics on metal bi-polar plates for corrosion; and (5) Participate and lead efforts in the DOE Working Groups.

  19. Solar Energy Development Assistance for Fort Hunter Liggett

    SciTech Connect (OSTI)

    Russo, Bryan J.; Hoffman, Michael G.; Chvala, William D.

    2011-03-30T23:59:59.000Z

    Pacific Northwest National Laboratory provided assistance to Fort Hunter Liggett to determine the opportunities for solar energy development on the site. Increasing use of renewable energy is mandated by several executive orders and legislation. Fort Hunter Liggett has many attributes that enhance its suitability for renewable energy development. First, the site is located south of San Francisco in a remote portion of the costal foothills. Brush and forest fires are frequent and often result in power outages, which subsequently impacts the sites training mission. In addition, the sites blended electric rate during fiscal year (FY) 2010 was high at 12 /kWh. Lastly, the solar resource is moderately high; the site receives nearly 5.7 kWh/m2/day on a south facing, latitude-tilted surface. In light of these factors, the site is a clear candidate for a solar photovoltaic array. Prior to Pacific Northwest National Laboratorys (PNNL) involvement, the site secured funding for a 1 megawatt (MW) photovoltaic (PV) array that will also provide shading for site vehicles. To best implement this project, PNNL conducted a site visit and was tasked with providing the site technical guidance and support regarding module selection, array siting, and other ancillary issues.

  20. EIS-0431: Hydrogen Energy California's Project, Kern County, California

    Broader source: Energy.gov [DOE]

    This EIS evaluates the potential environmental impacts of a proposal to provide financial assistance for the construction and operation of Hydrogen Energy California's LLC project, which would produce and sell electricity, carbon dioxide and fertilizer. DOE selected this project for an award of financial assistance through a competitive process under the Clean Coal Power Initiative program.

  1. Enterprise Assessments Review, West Valley Demonstration Project...

    Energy Savers [EERE]

    conducted an independent oversight review of activity-level implementation of the radiation protection program at the West Valley Demonstration Project. The onsite review...

  2. Retargeting OpenAxiom to Poly/ML: Towards an Integrated Proof Assistants and Computer Algebra

    E-Print Network [OSTI]

    Bruck, Jehoshua (Shuki)

    Retargeting OpenAxiom to Poly/ML: Towards an Integrated Proof Assistants and Computer Algebra to integrate the AXIOM family of computer algebra systems with Poly/ML-based proof assistants in the same framework. A long-term goal is to make a large set of efficient implementations of algebraic algorithms

  3. DOE Technical Assistance Program

    Broader source: Energy.gov (indexed) [DOE]

    in Whatcom County, WA that works to foster a thriving local economy built on sustainable business practices. Alex is currently implementing the Community Energy Challenge, which...

  4. DOE Technical Assistance Program

    Broader source: Energy.gov (indexed) [DOE]

    NGRID NEEP * Identify Improvements - Energy audit * Goal SettingAction Plan - Set Investment Priorities * Goal implementation - Verify & Track Progress - EPA Energy Star...

  5. Plans, Implementation, and Results

    Broader source: Energy.gov [DOE]

    About the Weatherization and Intergovernmental Programs Office (WIPO) including information on plans, implementations, and results.

  6. Project Year Project Title

    E-Print Network [OSTI]

    Gray, Jeffrey J.

    Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve-specialized, but practically useless skill. Solution One goal of this summer's Applied Geographic Information Systems in Public lessons about observational epidemiology. Technologies Used Geographic Info System (GIS), Blackboard

  7. Low Income Home Energy Assistance Program (LIHEAP)

    Broader source: Energy.gov [DOE]

    The Low Income Home Energy Assistance Program (LIHEAP) provides resources to assist families with energy costs. This federally funded assistance helps in managing costs associated with:

  8. Oracle accrual plans from requirements to implementation

    SciTech Connect (OSTI)

    Rivera, Christine K [Los Alamos National Laboratory

    2009-01-01T23:59:59.000Z

    Implementing any new business software can be an intimidating prospect and this paper is intended to offer some insight in to how to approach this challenge with some fundamental rules for success. Los Alamos National Laboratory (LANL) had undergone an original ERP implementation of HRMS, Oracle Advanced Benefits, Worker Self Service, Manager Self Service, Project Accounting, Financials and PO, and recently completed a project to implement Oracle Payroll, Time and Labor and Accrual Plans. This paper will describe some of the important lessons that can be applied to any implementation as a whole, and then specifically how this knowledge was applied to the design and deployment of Oracle Accrual Plans for LANL. Finally, detail on the functionality available in Oracle Accrual Plans will be described, as well as the detailed setups.that were utilized at LANL.

  9. Medical Robots Surgical Assistants

    E-Print Network [OSTI]

    Pulfrey, David L.

    1 Medical Robots Surgical Assistants Efficacy of Procedure Accuracy Longevity Invasiveness Augment human capabilities Enabling new procedures Time under anaesthetic #12;2 Surgical Robots) Sensei (Hansen Medical) Autonomous Surgical Robots Robodoc.com #12;3 Guided Surgical Robots Makosurgical

  10. Administrative Business Assistant

    E-Print Network [OSTI]

    Rock, Chris

    Marketing Raider Welcome Tech Activities Board Town & Gown BUSINESS OFFICE Associate Director for Business Legal Services University ID Center University Police SUB Station Interim Chief Financial O cer & Vice IT Student Assistant (2) Interim Chief Financial O cer & Vice President for Administration and Finance (Sloan

  11. Anantha Aiyyer Assistant Professor

    E-Print Network [OSTI]

    Parker, Matthew D. Brown

    radiant energy over earth's surface Graphics source: Georgia Tech. Univ. 12 Solar energy received at any or rainfall amount is broken. Thus, even in a relatively cold climate, we can expect a heat wave or a record4/13/2011 1 Anantha Aiyyer Assistant Professor Marine, Earth and Atmospheric Sciences 1 Climate

  12. Office of Security Assistance

    Broader source: Energy.gov [DOE]

    The Office of Security Assistance manages the Technology Deployment Program to improve the security posture of the Department of Energy and the protection of its assets and facilities through the deployment of new safeguards and security technologies and development of advanced technologies that reduce operating costs, save protective force lives, and improve security effectiveness.

  13. Archives Research Assistant Classification: Student Assistant 3 (LSA 3)

    E-Print Network [OSTI]

    Archives Research Assistant Classification: Student Assistant 3 (LSA 3) Salary: $9.50 - $9.69 Hours: 15-20 per week The University of Oregon Libraries invites application for a part-time, temporary Archives Research Assistant in Knight Library's Special Collections and University Archives. The student

  14. Research Project Awards are available to Graduate and Under-

    E-Print Network [OSTI]

    Bolch, Tobias

    Research Project Awards are available to Graduate and Under- graduate Students on a competi- tive basis. Research Project Award funds assist students to carry out independent research projects. Recent Research Pro- ject Award Winners include: Lisha Berzins PhD candi- date (NRES) for her project: Female

  15. Energy Audits: The Key to Performance Contracting Projects

    E-Print Network [OSTI]

    Tharoor, M.

    1994-01-01T23:59:59.000Z

    The term "Performance Contracting" relates to projects where the performance of various energy conservation retrofits result in eavings that exceed the implementation cost of the entire project when financed over a fixed term. Such projects minimize...

  16. Job Training Assistance Programs (Tennessee)

    Broader source: Energy.gov [DOE]

    The Job Training Assistance Programs in Tennessee are a combination of three programs: The FastTrack Job Training Assistance Program (FJTAP), The Tennessee Job Skills Program (TJS), and The Job...

  17. Project Fact Sheet Project Update

    E-Print Network [OSTI]

    & Figures: Budget: 51,074,000 Funding Source: Capital Plan Construction Project Programme: Start on SiteProject Fact Sheet Project Update: Project Brief: The concept of the new scheme is to redevelop Gardens project http://www.imperial.ac.uk/princesgardens/ Construction Project Team: Project Facts

  18. Development and Optimization of Gas-Assisted Gravity Drainage (GAGD) Process for Improved Light Oil Recovery

    SciTech Connect (OSTI)

    Dandina N. Rao; Subhash C. Ayirala; Madhav M. Kulkarni; Wagirin Ruiz Paidin; Thaer N. N. Mahmoud; Daryl S. Sequeira; Amit P. Sharma

    2006-09-30T23:59:59.000Z

    This is the final report describing the evolution of the project ''Development and Optimization of Gas-Assisted Gravity Drainage (GAGD) Process for Improved Light Oil Recovery'' from its conceptual stage in 2002 to the field implementation of the developed technology in 2006. This comprehensive report includes all the experimental research, models developments, analyses of results, salient conclusions and the technology transfer efforts. As planned in the original proposal, the project has been conducted in three separate and concurrent tasks: Task 1 involved a physical model study of the new GAGD process, Task 2 was aimed at further developing the vanishing interfacial tension (VIT) technique for gas-oil miscibility determination, and Task 3 was directed at determining multiphase gas-oil drainage and displacement characteristics in reservoir rocks at realistic pressures and temperatures. The project started with the task of recruiting well-qualified graduate research assistants. After collecting and reviewing the literature on different aspects of the project such gas injection EOR, gravity drainage, miscibility characterization, and gas-oil displacement characteristics in porous media, research plans were developed for the experimental work to be conducted under each of the three tasks. Based on the literature review and dimensional analysis, preliminary criteria were developed for the design of the partially-scaled physical model. Additionally, the need for a separate transparent model for visual observation and verification of the displacement and drainage behavior under gas-assisted gravity drainage was identified. Various materials and methods (ceramic porous material, Stucco, Portland cement, sintered glass beads) were attempted in order to fabricate a satisfactory visual model. In addition to proving the effectiveness of the GAGD process (through measured oil recoveries in the range of 65 to 87% IOIP), the visual models demonstrated three possible multiphase mechanisms at work, namely, Darcy-type displacement until gas breakthrough, gravity drainage after breakthrough and film-drainage in gas-invaded zones throughout the duration of the process. The partially-scaled physical model was used in a series of experiments to study the effects of wettability, gas-oil miscibility, secondary versus tertiary mode gas injection, and the presence of fractures on GAGD oil recovery. In addition to yielding recoveries of up to 80% IOIP, even in the immiscible gas injection mode, the partially-scaled physical model confirmed the positive influence of fractures and oil-wet characteristics in enhancing oil recoveries over those measured in the homogeneous (unfractured) water-wet models. An interesting observation was that a single logarithmic relationship between the oil recovery and the gravity number was obeyed by the physical model, the high-pressure corefloods and the field data.

  19. Overview of NREL's Photovoltaic Advanced R D Project

    SciTech Connect (OSTI)

    Surek, T.

    1992-01-01T23:59:59.000Z

    The National Renewable Energy Laboratory's (NREL's) Photovoltaic Advanced Research and Development (PV AR D) Project supports the US Department of Energy's National Photovoltaics Program in assisting the development and commercialization of photovoltaics (PV) energy technology. The NREL program is implemented through in-house research and subcontracts, with over 50% of the annual budget awarded through competitive solicitations to universities, large and small businesses, and other research centers. These activities include cost-shared, multiyear, government/industry partnerships and technology initiatives. The research has resulted in a better fundamental understanding of materials, devices, and processes, the achievement of record efficiencies in nearly all PV technology areas, the identification of promising new approaches to low-cost photovoltaics, and the introduction of new PV technology products into system experiments and PV markets. This paper presents an overview of NREL's PV AR D Project in terms of project organization and budgets, near- and long-term project objectives, research participants, and current and future research directions. Recent progress in the in-house and subcontracted research activities is described. 4 refs.

  20. Project Funding

    Broader source: Energy.gov [DOE]

    Federal energy projects require funding to generate results. Carefully matching available funding options with specific project needs can make the difference between a stalled, unfunded project and a successful project generating energy and cost savings.

  1. Institutional Controls Implementation Guide for Use with DOE P 454.1, Use of Institutional Controls

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-10-14T23:59:59.000Z

    This Guide provides information to assist Department of Energy program and field offices in understanding what is necessary and acceptable for implementing the provisions of DOE P 454.1, Use of Institutional Controls. Certified 1-28-11.

  2. DOE Technical Assistance Program

    Broader source: Energy.gov (indexed) [DOE]

    Energy Drill 26 | Maximizing energy efficiency in municipal projects eere.energy.gov Behavior Modification http:cpsed.netnewsenergyenergy.pdf 27 | Maximizing energy...

  3. The Human Genome Diversity Project

    SciTech Connect (OSTI)

    Cavalli-Sforza, L. [Stanford Univ., CA (United States)

    1994-12-31T23:59:59.000Z

    The Human Genome Diversity Project (HGD Project) is an international anthropology project that seeks to study the genetic richness of the entire human species. This kind of genetic information can add a unique thread to the tapestry knowledge of humanity. Culture, environment, history, and other factors are often more important, but humanity`s genetic heritage, when analyzed with recent technology, brings another type of evidence for understanding species` past and present. The Project will deepen the understanding of this genetic richness and show both humanity`s diversity and its deep and underlying unity. The HGD Project is still largely in its planning stages, seeking the best ways to reach its goals. The continuing discussions of the Project, throughout the world, should improve the plans for the Project and their implementation. The Project is as global as humanity itself; its implementation will require the kinds of partnerships among different nations and cultures that make the involvement of UNESCO and other international organizations particularly appropriate. The author will briefly discuss the Project`s history, describe the Project, set out the core principles of the Project, and demonstrate how the Project will help combat the scourge of racism.

  4. Design and implementation of a CO{sub 2} flood utilizing advanced reservoir characterization and horizontal injection wells in a shallow shelf carbonate approaching waterflood depletion: Project management/evaluation plan

    SciTech Connect (OSTI)

    Hallenbeck, L.D.; Harpole, K.J.; Gerard, M.G.

    1995-05-03T23:59:59.000Z

    The objectives of the Management/Evaluation Plan are: (1) clarify management structure, task responsibilities and schedules, and (2) to be used as a basis for judging the Project Evaluation Report submitted as a part of the continuation application. The components addressed in the report are: management structure; project staff organization; management procedure; quality assurance plan; ES and H plan and environmental compliance reporting; task WBS and logic flow diagram; list and schedule of planned deliverables; diagram of existing facilities; industry interaction; and evaluation of technical and economic feasibility.

  5. A Study to Develop an Industrial-Scale, Computer-Controlled High Magnetic Field Processing (HMFP) System to Assist in Commercializing the Novel, Enabling HMFP Manufacturing Technology

    SciTech Connect (OSTI)

    Ludtka, Gail Mackiewicz- [ORNL; Chourey, Aashish [American Magnetics Inc.

    2010-08-01T23:59:59.000Z

    As the original magnet designer and manufacturer of ORNL s 9T, 5-inch ID bore magnet, American Magnetics Inc. (AMI) has collaborated with ORNL s Materials Processing Group s and this partnership has been instrumental in the development of our unique thermo-magnetic facilities and expertise. Consequently, AMI and ORNL have realized that the commercial implementation of the High Magnetic Field Processing (HMFP) technology will require the evolution of robust, automated superconducting (SC) magnet systems that will be cost-effective and easy to operate in an industrial environment. The goal of this project and CRADA is to significantly expedite the timeline for implementing this revolutionary and pervasive cross-cutting technology for future US produced industrial components. The successful completion of this project is anticipated to significantly assist in the timely commercialization and licensing of our HMFP intellectual property for a broad spectrum of industries; and to open up a new market for AMI. One notable outcome of this project is that the ThermoMagnetic Processing Technology WON a prestigious 2009 R&D 100 Awards. This award acknowledges and recognizes our TMP Technology as one of the top 100 innovative US technologies in 2009. By successfully establishing the design requirements for a commercial scale magnetic processing system, this project effort has accomplished a key first step in facilitating the building and demonstration of a superconducting magnetic processing coil, enabling the transition of the High Magnetic Field Processing Technology beyond a laboratory novelty into a commercially viable and industrially scalable Manufacturing Technology.

  6. Electrically-Assisted Diesel Particulate Filter Regeneration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Substrate Studies of an Electrically-Assisted Diesel Particulate Filter Electrically-Assisted Diesel Particulate Filter Regeneration...

  7. Laser-assisted electrochemistry

    SciTech Connect (OSTI)

    Glenn, D.F.

    1995-05-01T23:59:59.000Z

    The effect of laser irradiation on electrodeposition processes has been investigated. These studies demonstrated that the addition of laser irradiation to an electroplating process can dramatically enhance plating rates and current efficiencies, as well as improve the morphology of the resultant electrodeposit. During the course of these investigations, the mechanism for the laser enhancement of electrodeposition processes was determined. Experimental evidence was obtained to show that laser irradiation of the substrate results in increased metal ion concentrations at the surface of the electrode due to a laser-induced Soret effect. The laser-induced Soret effect has important implications for laser-assisted electrochemical processing. The increase in the surface concentration of ions allows efficient electrodeposition from dilute solutions. As such, laser- assisted electrodeposition may develop into an environmentally conscious manufacturing process by reducing waste and limiting worker exposure to toxic chemicals.

  8. Kalispel Resident Fish Project Annual Report, 2003.

    SciTech Connect (OSTI)

    Olson, Jason; Andersen, Todd

    2004-04-01T23:59:59.000Z

    In 2003 the Kalispel Natural Resource Department (KNRD) continued monitoring enhancement projects (implemented from 1996 to 1998) for bull trout (Salvelinus confluentus), westslope cutthroat (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). Additional baseline fish population and habitat assessments were conducted, in 2003, in tributaries to the Pend Oreille River. Further habitat and fish population enhancement projects were also implemented.

  9. Kalispel Resident Fish Project : Annual Report, 2002.

    SciTech Connect (OSTI)

    Andersen, Todd; Olson, Jason

    2003-03-01T23:59:59.000Z

    In 2002 the Kalispel Natural Resource Department (KNRD) continued monitoring enhancement projects (implemented from 1996 to 1998) for bull trout (Salvelinus confluentus), westslope cutthroat (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). Additional baseline fish population and habitat assessments were conducted, in 2002, in tributaries to the Pend Oreille River. Further habitat and fish population enhancement projects were also implemented in 2002.

  10. DEPARTMENT OF ENERGY (DOE) RESEARCH AND TECHNICAL ASSISTANCE PROGRAM

    E-Print Network [OSTI]

    Cooperation Act of 1968 (P.L. 90-577). DOE also uses the general parameters of the Office of Management, counter- terrorism, energy planning and analysis, or transportation systems assistance for an Intelligent, development projects, technical tests and evaluations, technical information, training activities, surveys

  11. Technical Assistance Program: Off to a Running Start (Newsletter)

    SciTech Connect (OSTI)

    Not Available

    2012-02-01T23:59:59.000Z

    This newsletter describes key activities of the DOE Office of Indian Energy Policy and Programs for Winter 2012. Between December 2, 2011, and January 15, 2012, 46 American Indian and Alaska Native Tribes submitted applications to receive technical assistance through the program, which provides Tribes with on-the-ground technical support from DOE and National Renewable Energy Laboratory (NREL) staff to help move tribal energy efficiency and renewable energy projects forward. The applications are being considered through the Strategic Technical Assistance Response Team (START) selection process, which incorporates expert reviews and outreach to Tribes who present a need for assistance with their community-based energy efficiency and renewable energy projects. The final successful applicants will be selected based on the clarity of their requests for technical assistance and the ability of START to successfully work with each unique project or community. At least three selected Tribes in Alaska will receive technical assistance between March and May 2012, and up to five selected Tribes in the contiguous United States will receive technical assistance between March and August 2012. During the months of START Program activity, DOE and NREL experts will work in the two locations. In Alaska, START experts will work directly with community-based project teams to analyze local energy issues and provide assistance with energy projects and cost savings initiatives. This effort will be bolstered by DOE-IE's partnership with the Denali Commission, which will provide further assistance and expertise. In the lower 48 states, NREL experts will work with the selected renewable energy START projects to evaluate financial and technical feasibility and provide early development technical assistance to better position the projects for financing and construction. This on-the-ground technical assistance is part of a broader DOE-IE effort to make reliable, accurate technical information and skills-based training available to tribal communities throughout the United States. The primary goal of the START initiative, according to DOE-IE Director Tracey A. LeBeau, is to bring about the next generation of energy development in Indian Country. Through energy project planning, quality training, and technical assistance, The START program will leverage the early-stage resource characterization and pre-feasibility investments that DOE has made in Indian Country over the years, and unlock the energy resources that exist on tribal lands to help build a 21st century tribal energy economy. Working collaboratively with a select group of Tribes and Alaska Native entities, the DOE Office of Indian Energy, NREL, and the Denali Commission will empower tribal leaders to make informed energy decisions and help build capacity to bring tribal energy visions to fruition and get renewable energy projects off the ground, said LeBeau. Ultimately, these efforts will serve to further the Obama Administration and DOE's shared commitment to provide Native American and Alaska Native communities with the tools and resources they need to foster tribal energy self-sufficiency and sustainability, advancing job creation and enhancing economic competitiveness.

  12. Program evaluation: Weatherization Residential Assistance Partnership (WRAP) Program

    SciTech Connect (OSTI)

    Jacobson, Bonnie B.; Lundien, Barbara; Kaufman, Jeffrey; Kreczko, Adam; Ferrey, Steven; Morgan, Stephen

    1991-12-01T23:59:59.000Z

    The Weatherization Residential Assistance Partnership,'' or WRAP program, is a fuel-blind conservation program designed to assist Northeast Utilities' low-income customers to use energy safely and efficiently. Innovative with respect to its collaborative approach and its focus on utilizing and strengthening the existing low-income weatherization service delivery network, the WRAP program offers an interesting model to other utilities which traditionally have relied on for-profit energy service contractors and highly centralized program implementation structures. This report presents appendices with surveys, participant list, and computers program to examine and predict potential energy savings.

  13. Rising Above the Water: New Orleans Implements Energy

    E-Print Network [OSTI]

    for Humanity DOE/NREL worked with Florida Solar Energy Center to assist the New Orleans Area Habitat for Humanity, the largest builder in the greater New Orleans area, to achieve ENERGY STAR efficiency levelsRising Above the Water: New Orleans Implements Energy Efficiency and Sustainability Practices

  14. Implementation Guide for Use in Addressing Unreviewed Safety Question Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-10-24T23:59:59.000Z

    This Guide provides information to assist in the implementation and interpretation of Title 10 Code of Federal Regulations (CFR) Part 830.203, Unreviewed Safety Question Process, of the Nuclear Safety Management Rules for applicable nuclear facilities owned or operated by the Department of Energy (DOE), including the National Nuclear Security Administration (NNSA). Canceled by DOE N 251.93.

  15. Implementation Guide for Use in Addressing Unreviewed Safety Question Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-07-24T23:59:59.000Z

    This Guide provides information to assist in implementation of Title 10 Code of Federal Regulations Part 830.203, "Unreviewed Safety Question Process," of the Nuclear Safety Management Rules for Category 1, 2, and 3 nuclear facilities owned or operated by the Department of Energy, including the National Nuclear Security Administration. Cancels DOE G 424.1-1.

  16. Implementing a Bayesian Approach for the Geographic Profiling Problem

    E-Print Network [OSTI]

    O'Leary, Michael

    Implementing a Bayesian Approach for the Geographic Profiling Problem Mike O'Leary Towson, DC June 22, 2010 Mike O'Leary (Towson University) Geographic Profiling COM.Geo 2010 1 / 38 #12 Phil Canter from the Baltimore County Police Department for his assistance. Mike O'Leary (Towson

  17. Parallel Implementation of multipole-based

    E-Print Network [OSTI]

    California at Berkeley, University of

    Parallel Implementation of multipole-based Poisson-Boltzmann solver Eng Hui Yap CS 267 Project May sphere ki: 1. Calculate surface charge multipole Snm (i) Express in and out in terms of multipoles (ii. Repeat for all spheres until convergence criteria is reached Solving LPBE with Multipole Method

  18. Successful biomass (wood pellets ) implementation in

    E-Print Network [OSTI]

    Successful biomass (wood pellets ) implementation in Estonia Biomass Utilisation of Local of primary energy in Estonia ! Wood fuels production ! Pellet firing projects in Estonia ­ SIDA Demo East Production of wood fuels in Estonia in 2002 Regional Energy Centres in Estonia Wood pellets production

  19. Impact assisted segmented cutterhead

    DOE Patents [OSTI]

    Morrell, Roger J. (Bloomington, MN); Larson, David A. (Minneapolis, MN); Ruzzi, Peter L. (Eagan, MN)

    1992-01-01T23:59:59.000Z

    An impact assisted segmented cutterhead device is provided for cutting various surfaces from coal to granite. The device comprises a plurality of cutting bit segments deployed in side by side relationship to form a continuous cutting face and a plurality of impactors individually associated with respective cutting bit segments. An impactor rod of each impactor connects that impactor to the corresponding cutting bit segment. A plurality of shock mounts dampening the vibration from the associated impactor. Mounting brackets are used in mounting the cutterhead to a base machine.

  20. Project Title:

    Broader source: Energy.gov (indexed) [DOE]

    Repair flowline 61-66-SX-3 DOE Code: Project Lead: Wes Riesland NEPA COMPLIANCE SURVEY 291 Project Information Date: 31 12010 Contractor Code: Project Overview In order to...

  1. Waste generator services implementation plan

    SciTech Connect (OSTI)

    Mousseau, J.; Magleby, M.; Litus, M.

    1998-04-01T23:59:59.000Z

    Recurring waste management noncompliance problems have spurred a fundamental site-wide process revision to characterize and disposition wastes at the Idaho National Engineering and Environmental Laboratory. The reengineered method, termed Waste Generator Services, will streamline the waste acceptance process and provide waste generators comprehensive waste management services through a single, accountable organization to manage and disposition wastes in a timely, cost-effective, and compliant manner. This report outlines the strategy for implementing Waste Generator Services across the INEEL. It documents the culmination of efforts worked by the LMITCO Environmental Management Compliance Reengineering project team since October 1997. These efforts have included defining problems associated with the INEEL waste management process; identifying commercial best management practices; completing a review of DOE Complex-wide waste management training requirements; and involving others through an Integrated Process Team approach to provide recommendations on process flow, funding/charging mechanisms, and WGS organization. The report defines the work that will be performed by Waste Generator Services, the organization and resources, the waste acceptance process flow, the funding approach, methods for measuring performance, and the implementation schedule and approach. Field deployment will occur first at the Idaho Chemical Processing Plant in June 1998. Beginning in Fiscal Year 1999, Waste Generator Services will be deployed at the other major INEEL facilities in a phased approach, with implementation completed by March 1999.

  2. New Mexico Small Business Assistance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Los Alamos, Sandia national laboratories LOS ALAMOS, NEW MEXICO, May 31, 2012-The New Mexico Small Business Assistance (NMSBA) program, a collaboration of Los Alamos National...

  3. OFFICE OF PROCUREMENT & ASSISTANCE MANAGEMENT

    Energy Savers [EERE]

    & ASSISTANCE MANAGEMENT INHERENTLY GOVERNMENTAL AND COMMERCIAL ACTIVITIES (IGCA) INVENTORY GUIDANCE 2012 Name Date Tel E-Mail Created by: Jeff Davis March 28, 2012...

  4. DOE and NREL Technical Assistance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    assistance to Greensburg, Kansas, in the following areas. MASTER PLAN FOR REBUILDING GREEN * Completed detailed studies on renewable energy sources, cost-effective energy...

  5. An SME's Perspective on Implementing the Superior Energy Performance Program

    E-Print Network [OSTI]

    Waz, P.

    An SME?s Perspective on Implementing the Superior Energy Performance Program? Pierre Waz CCP The CCP Houston plant participating in the Texas pilot project is a synthetic resin manufacturing plant and has approximately 50 employees. As a...

  6. UCSD Medical Center Ergonomic Funding Assistance Form Purpose: The UCSD Medical Center Workers' Compensation Unit (WCU) currently has funds

    E-Print Network [OSTI]

    Gleeson, Joseph G.

    UCSD Medical Center Ergonomic Funding Assistance Form Purpose: The UCSD Medical Center Workers' Compensation Unit (WCU) currently has funds available to assist departments implement ergonomic recommendations identified during an ergonomic assessment. This program will match up to 50% of the cost of identified

  7. Stress-Assisted Corrosion in Boiler Tubes

    SciTech Connect (OSTI)

    Preet M Singh; Steven J Pawel

    2006-05-27T23:59:59.000Z

    A number of industrial boilers, including in the pulp and paper industry, needed to replace their lower furnace tubes or decommission many recovery boilers due to stress-assisted corrosion (SAC) on the waterside of boiler tubes. More than half of the power and recovery boilers that have been inspected reveal SAC damage, which portends significant energy and economic impacts. The goal of this project was to clarify the mechanism of stress-assisted corrosion (SAC) of boiler tubes for the purpose of determining key parameters in its mitigation and control. To accomplish this in-situ strain measurements on boiler tubes were made. Boiler water environment was simulated in the laboratory and effects of water chemistry on SAC initiation and growth were evaluated in terms of industrial operations. Results from this project have shown that the dissolved oxygen is single most important factor in SAC initiation on carbon steel samples. Control of dissolved oxygen can be used to mitigate SAC in industrial boilers. Results have also shown that sharp corrosion fatigue and bulbous SAC cracks have similar mechanism but the morphology is different due to availability of oxygen during boiler shutdown conditions. Results are described in the final technical report.

  8. ISO 14001 IMPLEMENTATION AT A NATIONAL LABORATORY.

    SciTech Connect (OSTI)

    BRIGGS,S.L.K.

    2001-06-01T23:59:59.000Z

    After a tumultuous year discovering serious lapses in environment, safety and health management at Brookhaven National Laboratory, the Department of Energy established a new management contract. It called for implementation of an IS0 14001 Environmental Management System and registration of key facilities. Brookhaven Science Associates, the managing contractor for the Laboratory, designed and developed a three-year project to change culture and achieve the goals of the contract. The focus of its efforts were to use IS0 14001 to integrate environmental stewardship into all facets of the Laboratory's mission, and manage its programs in a manner that protected the ecosystem and public health. A large multidisciplinary National Laboratory with over 3,000 employees and 4,000 visiting scientists annually posed significant challenges for IS0 14001 implementation. Activities with environmental impacts varied from regulated industrial waste generation, to soil activation from particle accelerator operations, to radioactive groundwater contamination from research reactors. A project management approach was taken to ensure project completion on schedule and within budget. The major work units for the Environmental Management System Project were as follows: Institutional EMS Program Requirements, Communications, Training, Laboratory-wide Implementation, and Program Assessments. To minimize costs and incorporate lessons learned before full-scale deployment throughout the Laboratory, a pilot process was employed at three facilities. Brookhaven National Laboratory has completed its second year of the project in the summer of 2000, successfully registering nine facilities and self-declaring conformance in all remaining facilities. Project controls, including tracking and reporting progress against a model, have been critical to the successful implementation. Costs summaries are lower than initial estimates, but as expected legal requirements, training, and assessments are key cost centers. Successes to date include the pilot process, heightened employee awareness, registration of the first DOE National Laboratory facility, line ownership of the program, and senior management commitment.

  9. Blackout Final Implementation Report

    Office of Environmental Management (EM)

    Task Force: Final Report on Implementation of Recommendations G R23. Strengthen reactive power and voltage control practices in all NERC regions. . . . . . . . . . . . . . 34 R24....

  10. Implementation Guide for Use with 10 CFR Part 851, Worker Safety and Health Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-12-27T23:59:59.000Z

    This Guide provides supplemental information and describes implementation practices to assist contractors in effectively developing, managing and implementing worker safety and health programs required by 10 Code of Federal Regulations, Part 851, Worker Safety and Health Program. Canceled by DOE G 440.1-1B.

  11. Does it have to be so complicated? : municipal renewable energy projects in Massachusetts

    E-Print Network [OSTI]

    Riberio, Lori A. (Lori Ann)

    2006-01-01T23:59:59.000Z

    This thesis examines municipal implementation of renewable energy projects in Massachusetts. It explores projects that have been planned and completed, drivers for municipal adoption of renewable energy, the implementation ...

  12. Process for Procuring a Federal Energy Savings Performance Contract

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program (FEMP) assists agencies with implementing energy savings performance contract (ESPC) projects.

  13. Technical Assistance Contractor management plan. Revision 1

    SciTech Connect (OSTI)

    NONE

    1995-08-01T23:59:59.000Z

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.

  14. Project Controls

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

  15. State DOT: Michigan State Report Questions on MEPDG Implementation

    E-Print Network [OSTI]

    State DOT: Michigan State Report Questions on MEPDG Implementation 1. Summarize your state's status as far as MEPDG Implementation. Michigan DOT has purchased a single copy of DARWin-ME for the statewide, a research project will begin with Michigan State University involving local calibration and validation

  16. GRADUATE STUDENT TUITION ON RESEARCH AWARDS Graduate Student salaries and tuition costs are allowable costs on sponsored projects and are

    E-Print Network [OSTI]

    Krovi, Venkat

    Graduate students may be employed as Research Project Assistants to perform necessary work on research include a budget for graduate tuition costs based on the current five year projected tuition schedule 2 OF 5 The requirement to include graduate student tuition costs for Research Project Assistants can

  17. Environmental protection Implementation Plan

    SciTech Connect (OSTI)

    R. C. Holland

    1999-12-01T23:59:59.000Z

    This ``Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ``Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities.

  18. Proof-assistants using Dependent Type Henk Barendregt

    E-Print Network [OSTI]

    Barendregt, Henk

    .3 Autarkic Computations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72 5 Proof assistants

  19. Laser Assisted Emittance Exchange

    SciTech Connect (OSTI)

    Xiang, Dao; /SLAC

    2012-06-11T23:59:59.000Z

    We describe here the laser assisted emittance exchange (LAEE) technique. A laser operating in the transverse mode (TEM10 or TEM01) is used to interact with the electron beam in a dispersive region and to initiate the transverse-to-longitudinal emittance exchange. It is shown that with the LAEE one can generate an electron beam with ultralow transverse emittance, which allows one to significantly bring down the size of an X-ray free electron laser (FEL) and greatly extend the availability of these light sources. The technique can also be used to enhance the performances of X-ray FELs in storage rings. The timing and energy jitter problems for the standard emittance exchange and LAEE techniques are also discussed.

  20. A Bicycle Electric Assist Unit

    E-Print Network [OSTI]

    Petron, Arthur J

    2010-01-01T23:59:59.000Z

    The BEAU is an electric-assist bicycle system that is completely self-contained within the rear wheel. The purpose of approaching a electric-assist bicycle in this manner is two-fold: simplifying the device and opening the ...

  1. Alaska Native Community Energy Planning and Projects (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2013-06-01T23:59:59.000Z

    This fact sheet provides information on the Alaska Native villages selected to receive assistance from the U.S. Department of Energy Office of Indian Energy 2013 Strategic Technical Assistance Response Team (START) Program, which provides technical expertise to support the development of next-generation energy projects on tribal lands.

  2. Scotts Valley Energy Office and Human Capacity Building that will provide energy-efficiency services and develop sustainable renewable energy projects.

    SciTech Connect (OSTI)

    Anderson, Temashio [Scotts Valley Band of Pomo Indians

    2013-06-28T23:59:59.000Z

    The primary goal of this project is to develop a Scotts Valley Energy Development Office (SVEDO). This office will further support the mission of the Tribe's existing leadership position as the DOE Tribal Multi-County Weatherization Energy Program (TMCWEP) in creating jobs and providing tribal homes and buildings with weatherization assistance to increase energy efficiency, occupant comfort and improved indoor air quality. This office will also spearhead efforts to move the Tribe towards its further strategic energy goals of implementing renewable energy systems through specific training, resource evaluation, feasibility planning, and implementation. Human capacity building and continuing operations are two key elements of the SVEDO objectives. Therefore, the project will 1) train and employ additional Tribal members in energy efficiency, conservation and renewable resource analyses and implementation; 2) purchase materials and equipment required to implement the strategic priorities as developed by the Scotts Valley Tribe which specifically include implementing energy conservation measures and alternative energy strategies to reduce energy costs for the Tribe and its members; and 3) obtain a dedicated office and storage space for ongoing SVEDO operations.

  3. Project Hanford management contract quality improvement project management plan

    SciTech Connect (OSTI)

    ADAMS, D.E.

    1999-03-25T23:59:59.000Z

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process.

  4. Implementing Safeguards-by-Design

    SciTech Connect (OSTI)

    Trond Bjornard; Robert Bean; Phillip Casey Durst; John Hockert; James Morgan

    2010-02-01T23:59:59.000Z

    Executive Summary Excerpt Safeguards-by-Design (SBD) is an approach to the design and construction of nuclear facilities whereby safeguards are designed-in from the very beginning. It is a systematic and structured approach for fully integrating international and national safeguards (MC&A), physical security, and other proliferation barriers into the design and construction process for nuclear facilities. SBD is primarily a project management or project coordination challenge, and this report focuses on that aspect of SBD. The present report continues the work begun in 2008 and focuses specifically on the design process, or project management and coordination - the planning, definition, organization, coordination, scheduling and interaction of activities of the safeguards experts and stakeholders as they participate in the design and construction of a nuclear facility. It delineates the steps in a nuclear facility design and construction project, in order to provide the project context within which the safeguards design activities take place, describes the involvement of safeguards experts in the design process, the nature of their analyses, interactions and decisions, as well as describing the documents created and how they are used. Designing and constructing a nuclear facility is an extremely complex undertaking. The stakeholders in an actual project are many owner, operator, State regulators, nuclear facility primary contractor, subcontractors (e.g. instrument suppliers), architect engineers, project management team, safeguards, safety and security experts, in addition to the IAEA and its team. The purpose of the present report is to provide a common basis for discussions amongst stakeholders to collaboratively develop a SBD approach that will be both practically useful and mutually beneficial. The principal conclusions from the present study are: In the short term, the successful implementation of SBD is principally a project management problem. Life-cycle cost analysis can be a useful tool in safeguards design. An important obstacle to straight forward application of life-cycle cost analysis is that there is no single organization responsible for the entire life-cycle cost of the facility. The Safeguards Effectiveness Report (SGER) is proposed as a focus for the safeguards design activities, and is intended to be a living document that contains increasing safeguards relevant scope and content as the facility design emerges. Further work is required in a number of areas. The authors note that other studies supported by NGSI are addressing the development of requirements and performance criteria, as well as contributing to the design toolkit through the development of technology, methodology, and safeguards guidelines for designers. With respect to further development of the SBD design process, the authors recommend: In the short term, conduct a workshop with interested industry representatives, to ensure that their perspectives and needs are factored into further development. In the short term, provide NGSI SBD project documents to IAEA, and support them in the conduct of an SBD Workshop II. In the medium term, continue to support the SBD demonstration work started with the Next Generation Nuclear Plant project. In the longer term, conduct further studies to examine the integration of SBD into projects with concurrent consideration of physical security and safety.

  5. WANTED: Undergraduate Research Assistant Betelgeuse's Molecular Inventory

    E-Print Network [OSTI]

    Harper, Graham

    WANTED: Undergraduate Research Assistant Betelgeuse's Molecular Inventory GHRS Pre-COSTAR LSA G140L Assistant Opportunity We are seeking an undergraduate research assistant to help make an inventory

  6. Clinical Assistant Professor Human Resource Development

    E-Print Network [OSTI]

    Clinical Assistant Professor Human Resource Development Texas A&M University's Department, seeks a Clinical Assistant Professor of Human Resource Development with emphasis in Technology Management. This individual will assume the duties typically expected of a Clinical Assistant Professor

  7. GRADUATE COLLEGE TERMINATION OF GRADUATE ASSISTANT

    E-Print Network [OSTI]

    Cho, Hokwon

    GRADUATE COLLEGE TERMINATION OF GRADUATE ASSISTANT Policy Information & Directions for GA Termination 1. Once appointed, graduate assistants may not have their tuition/fees revoked standards, the Termination of Graduate Assistant form may be used to terminate a GA appointment

  8. Will Russian Scientists Go Rogue? A Survey on the Threat and the Impact of Western Assistance

    SciTech Connect (OSTI)

    Ball, D Y; Gerber, T P

    2004-12-27T23:59:59.000Z

    The collapse of the Soviet Union sparked fears throughout the world that rogue nations and terrorist organizations would gain access to weapons of mass destruction (WMD). One specific concern has been 'WMD brain drain.' Russians with knowledge about nuclear, chemical, and biological weapons could now depart to any country of their choice, including rogue nations seeking to produce WMD. Meanwhile, Russian science fell into a protracted crisis, with plummeting salaries, little funding for research, and few new recruits to science. These developments increased both the incentives and the opportunities for scientists to sell their knowledge to governments and terrorist organizations with hostile intentions toward the United States. Recognizing the threat of WMD brain drain from Russia, the United States, and other governments implemented a host of programs designed to reduce the risk. Despite, or perhaps partly because of, massive assistance from the West to prevent scientists with WMD knowledge from emigrating, the threat of Russian WMD brain drain has recently faded from view. Yet we have seen no evidence that these programs are effective and little systematic assessment of the current threat of WMD migration. Our data from an unprecedented survey of 602 Russian physicists, biologists, and chemists suggest that the threat of WMD brain drain from Russia should still be at the forefront of our attention. Roughly 20 percent of Russian physicists, biologists, and chemists say they would consider working in rogue nations such as North Korea, Iran, Syria, or Iraq (still considered a rogue state at the time of the survey). At the same time, the data reveal that U.S. and Western nonproliferation assistance programs work. They significantly reduce the likelihood that Russian scientists would consider working in these countries. Moreover, Russian grants do not reduce scientists' propensity to 'go rogue'. These survey findings have clear policy implications: the U.S. and its allies must continue to adequately fund nonproliferation assistance programs rather than hastily declare victory. The U.S. should remain engaged with former Soviet WMD scientists until they are willing and able to find support for their research from competitive, civilian-oriented, privately funded projects. Otherwise, we run a great risk that WMD expertise will migrate from the former Soviet Union to countries or organizations that harbor hostile intentions toward the U.S. Assistance programs work to reduce the threat of WMD brain drain, but their task is not complete. Now is not the time to pull back.

  9. The Weatherization Assistant User's Manual (Version 8.9)

    SciTech Connect (OSTI)

    Gettings, Michael B [ORNL; Malhotra, Mini [ORNL; Ternes, Mark P [ORNL

    2015-01-01T23:59:59.000Z

    The Weatherization Assistant is a Windows-based energy audit software tool that was developed by Oak Ridge National Laboratory (ORNL) to help states and their local weatherization agencies implement the U.S. Department of Energy (DOE) Weatherization Assistance Program. The Weatherization Assistant is an umbrella program for two individual energy audits or measure selection programs: the National Energy Audit Tool (NEAT) for site-built single-family homes and the Manufactured Home Energy Audit (MHEA) for mobile homes. The Weatherization Assistant User's Manual documents the operation of the user interface for Version 8.9 of the software. This includes how to install and setup the software, navigate through the program, and initiate an energy audit. All of the user interface forms associated with the software and the data fields on these forms are described in detail. The manual is intended to be a training manual for new users of the Weatherization Assistant and as a reference manual for experienced users.

  10. Project Fact Sheet Project Update

    E-Print Network [OSTI]

    Project Fact Sheet Project Update: Project Brief: The works cover the refurbishment of floors 4, 5, with `wet' labs for molecular biology, materials characterisation, cell culture and flow studies, and `dry operating theatre. The Bionanotechnology Centre is one of the projects funded from the UK Government's £20

  11. Project Fact Sheet Project Brief

    E-Print Network [OSTI]

    .union.ic.ac.uk/marketing/building Construction Project Team: Project Facts & Figures: Budget: 1,400,000 Funding Source: Capital PlanProject Fact Sheet Project Brief: In the first phase of the Union Building re that it adapts to meet the needs of a changing student body. The re-development plans are grounded in a full

  12. Project Fact Sheet Project Brief

    E-Print Network [OSTI]

    Facts & Figures: Budget: 3,500,000 Funding Source: SRIF III Construction Project Programme: StartProject Fact Sheet Project Brief: This project refurbished half of the 5th and 7th floors of work includes: Building fabric replacement and revised space planning New mechanical and electrical

  13. Distributed Cognition Learning in Collaborative Civil Engineering Projects Management

    E-Print Network [OSTI]

    Grimaldo, Francisco

    Engineer- ing domain has historically encompassed very heterogeneous disciplines. From the beginning, anyDistributed Cognition Learning in Collaborative Civil Engineering Projects Management Jaume Dom to manage these design conflicts by detecting them, by assisting the engineers in the negotiation

  14. DOE Announces Clean Energy Projects for Low-Carbon Communities...

    Broader source: Energy.gov (indexed) [DOE]

    that the U.S. Department of Energy has selected three initial projects under the Low-Carbon Communities of the Americas (LCCA) - a program launched in June 2009 to assist...

  15. A study of surfactant-assisted waterflooding

    SciTech Connect (OSTI)

    Scamehorn, J.F.; Harwell, J.H.

    1990-09-01T23:59:59.000Z

    In surfactant-assisted waterflooding, a surfactant slug is injected into a reservoir, followed by a brine spacer, followed by second surfactant slug. The charge on the surfactant in the first slug has opposite sign to that in the second slug. When the two slugs mix in the reservoir, a precipitate or coacervate is formed which plugs the permeable region of the reservoir. Subsequently injected water or brine is forced through the low permeability region of the reservoir, increasing sweep efficiency of the waterflood, compared to a waterflood not using surfactants. In this part of the work, two major tasks are performed. First, core floods are performed with oil present to demonstrate the improvement in incremental oil production, as well as permeability modification. Second, a reservoir simulation model will be proposed to further delineate the optimum strategy for implementation of the surfactant-assisted waterflooding, as well as indicate the reservoir types for which it would be most effective. Surfactants utilized were sodium dodecyl sulfate and dodecyl pyridinium chloride. 44 refs., 17 figs., 3 tabs.

  16. International Assistance for Low-Emission Development Planning: Coordinated Low Emissions Assistance Network (CLEAN) Inventory of Activities and Tools--Preliminary Trends

    SciTech Connect (OSTI)

    Cox, S.; Benioff, R.

    2011-05-01T23:59:59.000Z

    The Coordinated Low Emissions Assistance Network (CLEAN) is a voluntary network of international practitioners supporting low-emission planning in developing countries. The network seeks to improve quality of support through sharing project information, tools, best practices and lessons, and by fostering harmonized assistance. CLEAN has developed an inventory to track and analyze international technical support and tools for low-carbon planning activities in developing countries. This paper presents a preliminary analysis of the inventory to help identify trends in assistance activities and tools available to support developing countries with low-emission planning.

  17. Profiles in Leadership: Christopher Smith, Assistant Secretary...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Profiles in Leadership: Christopher Smith, Assistant Secretary for Fossil Energy Profiles in Leadership: Christopher Smith, Assistant Secretary for Fossil Energy July 15, 2015 -...

  18. Federal Energy Management Program (FEMP) Technical Assistance...

    Energy Savers [EERE]

    Federal Energy Management Program (FEMP) Technical Assistance Request Portal User Guide Federal Energy Management Program (FEMP) Technical Assistance Request Portal User Guide...

  19. Electrically-Assisted Diesel Particulate Filter Regeneration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Evaluation pm041lance2011p.pdf More Documents & Publications Electrically-Assisted Diesel Particulate Filter Regeneration Substrate Studies of an Electrically-Assisted Diesel...

  20. Energy Department Technical Assistance Bolsters Tribal Clean...

    Energy Savers [EERE]

    Technical Assistance Bolsters Tribal Clean Energy Deployment Energy Department Technical Assistance Bolsters Tribal Clean Energy Deployment December 2, 2011 - 3:39pm Addthis The...

  1. ARRA Proposed Award: Energy Technology Assistance Program

    E-Print Network [OSTI]

    ARRA Proposed Award: Energy Technology Assistance Program Statewide Program ­ covering Greater. Highlights: Energy Technology Assistance Program (ETAP) is a statewide program that will focus on providing

  2. EIS-0464: Lake Charles Carbon Capture and Storage (CCS) Project in Calcasieu Parish, Louisiana

    Broader source: Energy.gov [DOE]

    This EIS evaluates the potential environmental impacts of providing financial assistance for the construction and operation of a project proposed by Leucadia Energy, LLC. DOE selected this project for an award of financial assistance through a competitive process under the Industrial Carbon Capture and Sequestration Program.

  3. EIS-0431: Hydrogen Energy California's Integrated Gasification Combined Cycle and Carbon Capture and Sequestration Project, California

    Broader source: Energy.gov [DOE]

    This EIS evaluates the potential environmental impacts of a proposal to provide financial assistance for the construction and operation of Hydrogen Energy California's LLC project, which would produce and sell electricity, carbon dioxide and fertilizer. DOE selected this project for an award of financial assistance through a competitive process under the Clean Coal Power Initiative program.

  4. U.S. Department of Energy Region 6 Radiological Assistance Program response plan. Revision 2

    SciTech Connect (OSTI)

    Jakubowski, F.M.

    1998-02-01T23:59:59.000Z

    Upon request, the DOE, through the Radiological Assistance Program (RAP), makes available and will provide radiological advice, monitoring, and assessment activities during radiological incidents where the release of radioactive materials is suspected or has occurred. Assistance will end when the need for such assistance is over, or if there are other resources available to adequately address the incident. The implementation of the RAP is usually accomplished through the recommendation of the DOE Regional Coordinating Office`s (RCO) on duty Regional Response Coordinator (RRC) with the approval of the Regional Coordinating Office Director (RCOD). The DOE Idaho Operations Office (DOE-ID) is the designated RCO for DOE Region 6 RAP. The purpose of this document is: to describe the mechanism for responding to any organization or private citizen requesting assistance to radiological incidents; to coordinate radiological assistance among participating federal agencies, states, and tribes in DOE Region 6; and to describe the RAP Scaled Response concept of operations.

  5. Environmental restoration program pollution prevention checklist guide for the evaluation of alternatives project phase

    SciTech Connect (OSTI)

    Not Available

    1993-09-01T23:59:59.000Z

    Evaluation of alternative studies determine what decontamination and decommissioning (D&D) alternatives are presented to regulators for facility and site cleanup. A key consideration in this process is the waste to be generated. Minimizing the volume and toxicity of this waste will ultimately contribute to the selection of the best clean-up option. The purpose of this checklist guide is to assist the user with incorporating pollution prevention/waste minimization (PP/WM) in all Evaluation of Alternatives (EV) phase projects of the Environmental Restoration (ER) Program. This guide will assist users with documenting PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to help users implement and evaluate waste reduction. Users can then establish numerical performance measures to measure progress in planning, training, self-assessments, field implementation, documentation, and technology transfer. Cost savings result as users train and assess themselves, eliminating expensive process waste assessments and audit teams.

  6. Wetland Flow and Salinity Budgets and Elements of a Decision Support System toward Implementation of Real-Time Seasonal Wetland Salinity Management

    SciTech Connect (OSTI)

    Quinn, N.W.T.; Ortega, R.; Rahilly, P.; Johnson, C.B.

    2011-12-17T23:59:59.000Z

    The project has provided science-based tools for the long-term management of salinity in drainage discharges from wetlands to the San Joaquin River. The results of the project are being used to develop best management practices (BMP) and a decision support system to assist wetland managers adjust the timing of salt loads delivered to the San Joaquin River during spring drawdown. Adaptive drainage management scheduling has the potential to improve environmental compliance with salinity objectives in the Lower San Joaquin River by reducing the frequency of violation of Vernalis salinity standards, especially in dry and critically dry years. The paired approach to project implementation whereby adaptively managed and traditional practices were monitored in a side-by-side fashion has provided a quantitative measure of the impacts of the project on the timing of salt loading to the San Joaquin River. The most significant accomplishments of the project has been the technology transfer to wetland biologists, ditch tenders and water managers within the Grasslands Ecological Area. This learning by doing has build local community capacity within the Grassland Water District and California Department of Fish and Game providing these institutions with new capability to assess and effectively manage salinity within their wetlands while simultaneously providing benefits to salinity management of the San Joaquin River.

  7. Utility Energy Service Contracts for Renewable Energy Projects

    Broader source: Energy.gov [DOE]

    Utility energy service contracts (UESCs) offer Federal agencies an effective means to implement energy efficiency, renewable energy, and water efficiency projects. In a UESC, a utility arranges...

  8. FAO Global Inventory of Agricultural Mitigation Projects in Developing...

    Open Energy Info (EERE)

    be reduced and sinks created in biomass and soils while increasing resilience and productivity. The project will contribute to ongoing research and implementation work of such...

  9. October 2008 Implementation Manual

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    original implementation budget (i.e., budget at start of rate period) LED Light-emitting diode Low-income Low income household eligibility is defined in the Federal...

  10. GPFS HPSS Integration: Implementation Experience

    SciTech Connect (OSTI)

    Hazen, Damian; Hick, Jason

    2008-08-12T23:59:59.000Z

    In 2005 NERSC and IBM Global Services Federal began work to develop an integrated HSM solution using the GPFS file system and the HPSS hierarchical storage system. It was foreseen that this solution would play a key role in data management at NERSC, and fill a market niche for IBM. As with many large and complex software projects, there were a number of unforeseen difficulties encountered during implementation. As the effort progressed, it became apparent that DMAPI alone could not be used to tie two distributed, high performance systems together without serious impact on performance. This document discusses the evolution of the development effort, from one which attempted to synchronize the GPFS and HPSS name spaces relying solely on GPFS?s implementation of the DMAPI specification, to one with a more traditional HSM functionality that had no synchronized namespace in HPSS, and finally to an effort, still underway, which will provide traditional HSM functionality, but requires features from the GPFS Information Lifecycle Management (ILM) to fully achieve this goal in a way which is scalable and meets the needs of sites with aggressive performance requirements. The last approach makes concessions to portability by using file system features such as ILM and snapshotting in order to achieve a scalable design.

  11. Technical Assistance Project (TAP) Revolving Loan Funds: Basics...

    Office of Environmental Management (EM)

    Presentation by Texas LoanSTAR Manager Theresa Sifuentes from the Texas State Energy Conservation Office (SECO) at the August 26, 2009 TAP Webcast for the U.S. Department of...

  12. Enhanced Customer/Utility Relations Through an EPRI Assisted Project

    E-Print Network [OSTI]

    Bailey, H.

    of the collaborative effort involving Pennzoil, SWEPCO and EPRI. SWEPCO gained valuable knowledge of the needs of the customer and how to meet those needs....

  13. United States Department of Energy Technical Assistance Project...

    Open Energy Info (EERE)

    of Energy Sector: Energy Focus Area: Renewable Energy Resource Type: Training materials, Webinar ComplexityEase of Use: Simple Website: www1.eere.energy.govwip...

  14. ESPC ENABLE Project Assistance and Training | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the YouTube|6721 Federal Register / Vol.6: RecordJune 20,in the101ESPC ENABLEProject

  15. Energy Design Assistance Project Tracker - 2014 BTO Peer Review |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the YouTube|6721 Federal RegisterHydrogen andResiliency |EfficiencyDepartment of Energy

  16. Energy Savings Performance Contract Project Assistance for Agencies

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the YouTube|6721 FederalTexas Energy IncentiveLandscaping EnergySavings* Enhanced ability to

  17. EM Projects Perspective - Jack Surash, Deputy Assistant Secretary for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:RevisedAdvisory Board Contributions EM HighlightsSeptember

  18. Federal Assistance Reporting Checklist and Instructions for Projects |

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently20,000 Russian NuclearandJunetrackEllen|JulyR--FOIA

  19. Federal Energy Management Program Renewable Energy Project Assistance |

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy Chinaof EnergyImpactOnSTATEMENT OF DAVIDThe data dashboardA A NA

  20. Federal Renewable Energy Project Assistance and Resources | Department of

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO2: FinalOffers New Training on Energy6 Federal Energy1999;Federal Register

  1. Secretary Chu Announces Nearly $21 Million in Technical Assistance Projects

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO Overview OCHCO OverviewRepository |Complex" at Los| Department of Energy than

  2. Technical Assistance Project (TAP) Revolving Loan Funds: Basics and Best

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently AskedEnergyIssuesEnergy Solar Decathlon | Department of EnergySHARING

  3. Leveraged small business projects will receive free technical assistance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHigh SchoolIn12electron 9 5Let us count the ways. We've13, 2009

  4. DOE Financial Assistance Awards: Active Project Management | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the YouTube| Department of Energy -StateOffshoreFuelCleanup10 DOE F15.11Department

  5. Secretary Chu Announces Nearly $21 Million in Technical Assistance Projects

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOriginEducationVideo »Usage »DownloadSolarSequestration |FutureGen 2.0to Improve Energy Use in

  6. Deputy Assistant Secretary for Acquisition and Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:Revised Finding of No53197E T A * S H I E L D * ASubcommittee on Financial andJ. E.

  7. The Building Codes Assistance Project (BCAP) | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-f <MaintainedInformation 2Energy InformationAshden AwardsTheCodes

  8. Industrial Assistance and Projects Databases | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently Asked Questions for DOEthe RankingReform atSolar2014 ||Alaska|

  9. Examples of OSUR Assisted Projects | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC) Environmental Assessments (EA) /Email Announcements12:25Sequedex:Example Batch Auburn

  10. United States Department of Energy Technical Assistance Project (TAP)

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown of Ladoga, IndianaTurtleCooperative Place: Beaver

  11. Deputy Assistant Secretary for Acquisition and Project Management

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan Department of Energy ReleasesDepartmentThree Biorefineries to

  12. Deputy Assistant Secretary for Acquisition and Project Management

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan Department of Energy ReleasesDepartmentThree Biorefineries to Surash

  13. Eubank Field, Kansas: a formation evaluation and secondary recovery project

    E-Print Network [OSTI]

    Dexheimer, Dominique

    1999-01-01T23:59:59.000Z

    recovery project in the Eubank Field, and this thesis was proposed to evaluate the Chester in terms of reservoir and fluids properties. The purpose of this thesis is to provide recommendations to implement a waterflood project at Eubank Field. All...

  14. River Protection Project (RPP) Project Management Plan

    SciTech Connect (OSTI)

    NAVARRO, J.E.

    2001-03-07T23:59:59.000Z

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  15. Assistant Professor Agricultural Systems Modeler

    E-Print Network [OSTI]

    Veiga, Pedro Manuel Barbosa

    Assistant Professor Agricultural Systems Modeler Department of Plant and Soil Sciences Division of Agricultural Sciences and Natural Resources Oklahoma State University Stillwater, Oklahoma POSITION DESCRIPTION The Department of Plant and Soil Sciences, Oklahoma State University is seeking applicants

  16. Engineering Organization Chart Assistant Dean

    E-Print Network [OSTI]

    Delene, David J.

    Engineering Organization Chart Fall `12 Assistant Dean Outreach & Recruiting Matthew Cavalli and Geological Engineering Joseph Hartman Chair, Petroleum Engineering Steve Benson Chair, Electrical Engineering Forrest Ames (interim) Chair, Mechanical Engineering Matthew Cavalli Chair, Chemical Engineering Mike Mann

  17. Geothermal Direct-Heat Utilization Assistance - Final Report

    SciTech Connect (OSTI)

    J. W. Lund

    1999-07-14T23:59:59.000Z

    The Geo-Heat Center provided (1) direct-use technical assistance, (2) research, and (3) information dissemination on geothermal energy over an 8 1/2 year period. The center published a quarterly bulletin, developed a web site and maintained a technical library. Staff members made 145 oral presentations, published 170 technical papers, completed 28 applied research projects, and gave 108 tours of local geothermal installations to 500 persons.

  18. Case Studies of integrated hydrogen systems. International Energy Agency Hydrogen Implementing Agreement, Final report for Subtask A of task 11 - Integrated Systems

    SciTech Connect (OSTI)

    Schucan, T. [Paul Scherrer Inst., Villigen PSI (Switzerland)

    1999-12-31T23:59:59.000Z

    Within the framework of the International Energy Agency Hydrogen Implementing Agreement, Task 11 was undertaken to develop tools to assist in the design and evaluation of existing and potential hydrogen demonstration projects. Emphasis was placed on integrated systems, from input energy to hydrogen end use. Included in the PDF document are the Executive Summary of the final report and the various case studies. The activities of task 11 were focused on near- and mid-term applications, with consideration for the transition from fossil-based systems to sustainable hydrogen energy systems. The participating countries were Canada, Italy, Japan, the Netherlands, Spain, Switzerland and the United States. In order for hydrogen to become a competitive energy carrier, experience and operating data need to be generated and collected through demonstration projects. A framework of scientific principles, technical expertise, and analytical evaluation and assessment needed to be developed to aid in the design and optimization of hydrogen demonstration projects to promote implementation. The task participants undertook research within the framework of three highly coordinated subtasks that focused on the collection and critical evaluation of data from existing demonstration projects around the world, the development and testing of computer models of hydrogen components and integrated systems, and the evaluation and comparison of hydrogen systems. While the Executive Summary reflects work on all three subtasks, this collection of chapters refers only to the work performed under Subtask A. Ten projects were analyzed and evaluated in detail as part of Subtask A, Case Studies. The projects and the project partners were: Solar Hydrogen Demonstration Project, Solar-Wasserstoff-Bayern, Bayernwerk, BMW, Linde, Siemens (Germany); Solar Hydrogen Plant on Residential House, M. Friedli (Switzerland); A.T. Stuart Renewable Energy Test Site; Stuart Energy Systems (Canada); PHOEBUS Juelich Demonstration Plant Research Centre, Juelich (FZJ) (Germany); Schatz Solar Hydrogen Project, Schatz Energy Research Centre, Humboldt State University (USA); INTA Solar Hydrogen Facility, INTA (Spain); Solar Hydrogen Fueled Trucks, Clean Air Now, Xerox (USA), Electrolyser (Canada); SAPHYS: Stand-Alone Small Size Photovoltaic Hydrogen Energy System, ENEA (Italy), IET (Norway), FZJ (Germany); Hydrogen Generation from Stand-Alone Wind-Powered Electrolysis Systems, RAL (United Kingdom), ENEA (Italy), DLR (Germany); Palm Desert Renewable Hydrogen Transportation Project; Schatz Energy Research Centre, City of Palm Desert (USA). Other demonstration projects are summarized in chapter 11.

  19. Document management guidelines for distributed project networks

    E-Print Network [OSTI]

    Hameri, A P; Himyr, Nils-Joar

    1999-01-01T23:59:59.000Z

    This paper provides the project engineer with guidelines or a checklist on tasks that must be considered, defined and documented before the project can successfully implement a document management system in geographically distributed project environment. Topics ranging from configuration management, approval process, document types, user administration and document naming are covered. The underlying cases of the paper are that of CERN (European Laboratory for Particle Physics) and its latest accelerator project, together with the Nordisk Industrifond -funded Connecting Distributed Competencies (NI#: 98082) project, with a focus on distributed shipbuilding processes. Keywords: distributed project management, product data management, networking, document management, virtual workspaces

  20. A Library for Locally Weighted Projection Regression

    E-Print Network [OSTI]

    Klanke, Stefan; Vijayakumar, Sethu; Schaal, Stefan

    2008-01-01T23:59:59.000Z

    In this paper we introduce an improved implementation of locally weighted projection regression (LWPR), a supervised learning algorithm that is capable of handling high-dimensional input data. As the key features, our ...

  1. Cost Avoidance vs. Utility Bill Accounting - Explaining the Discrepancy Between Guaranteed Savings in ESPC Projects and Utility Bills

    E-Print Network [OSTI]

    Kumar, S.; Sartor, D.

    2005-01-01T23:59:59.000Z

    Guaranteed Savings in ESPC Projects and Utility Bills Satishcommon when implementing an ESPC project. But is this a fairimplementation? In fact, ESPC contracts employ measurement

  2. The Material Protection, Control and Accounting Sustainability Program Implementation at the Electrochemical Plant

    SciTech Connect (OSTI)

    Sirotenko, Vladimir; Antonov, Eduard; Sirotenko, Alexei; Kukartsev, Alexander; Krivenko, Vladimir; Dabbs, Richard D.; Carroll, Michael F.; Garrett, Albert G.; Patrick, Scott W.; Ku, Esther M.

    2008-06-10T23:59:59.000Z

    Joint efforts by the Electrochemical Plant (ECP) in Zelenogorsk, Russia, and the United States Department of Energy National Nuclear Security Administration (US DOE/NNSA) Material Protection, Control and Accounting (MPC&A) Program to upgrade ECP security systems began in 1996. The commissioning of major MPC&A systems at ECP occurred in December 2004. Since that time, the US Project Team (USPT) and ECP personnel have focused jointly on the development and implementation of an enterprise-wide MPC&A Sustainability Program (SP) that address the seven essential MPC&A Program sustainability elements. This paper describes current operational experience at the ECP with the full implementation of the site SP utilizing an earned-value methodology. In support of this site program, ECP has established a Document Control Program (DCP) for sustainability-related documents; developed a robust master Work Breakdown Structure (WBS) that outlines all ECP MPC&A sustainability activities; and chartered an Enterprise-Wide Sustainability Working Group (ESWG) The earned value methodology uses ECP-completed (and USPT-verified) analyses to assess project performance on a quarterly basis. The MPC&A SP, presently operational through a contract between ECP and the Los Alamos National Laboratory (LANL), incorporates the seven essential MPC&A Program sustainability elements and governs all sustainability activities associated with MPC&A systems at ECP. The site SP is designed to ensure over the near term the upgraded MPC&A systems continuous operation at ECP as funding transitions from US-assisted to fully Russian supported and sustained.

  3. PERFORMANCE ASSESSMENT ASSISTANCE ACTIVITIES IN THE DOE COMPLEX

    SciTech Connect (OSTI)

    Seitz, R.

    2012-01-23T23:59:59.000Z

    The United States Department of Energy Office of Environmental Management (DOE-EM) has established a Performance Assessment Community of Practice (PA CoP) to foster the sharing of information among performance assessment (PA) and risk assessment practitioners, regulators and oversight personnel. The general intent is to contribute to continuous improvement in the consistency, technical adequacy and quality of implementation of PAs and risk assessments around the DOE Complex. The PA CoP activities have involved commercial disposal facilities and international participants to provide a global perspective. The PA CoP has also sponsored annual technical exchanges as a means to foster improved communication and to share lessons learned from on-going modelling activities. The PA CoP encourages activities to provide programmatic and technical assistance in the form of sharing experience and lessons learned with practitioners during the development of PAs and risk assessments. This assistance complements DOE-EM reviews through the Low-Level Waste Disposal Facility Federal Review Group (LFRG) that are conducted after modelling efforts are completed. Such up-front assistance is providing additional value in terms of improving consistency and sharing of information. There has been a substantial increase in the amount of assistance being provided. The assistance has been well received by practitioners and regulators that have been involved. The paper highlights assistance and sharing of information that has been conducted in the last two years to support activities underway in support of proposed disposal facilities at Paducah, Portsmouth, and the Idaho National Laboratory and tank closure at Hanford.

  4. Implementation Guide for Use in Addressing Unreviewed Safety Question Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-08T23:59:59.000Z

    This Guide, including its attachments, provides information to assist in the implementation of Title 10 Code of Federal Regulations (CFR) Section 830.203, Unreviewed Safety Question Process, of the Nuclear Safety Management Rules for Category 1, 2, and 3 nuclear facilities owned or operated by the Department of Energy (DOE), including the National Nuclear Security Administration (NNSA). Cancels DOE G 424.1-1A. Admin Chg 1 dated 4-12-13.

  5. Mission Need Statement: Calcine Disposition Project Major Systems Acquisition Project

    SciTech Connect (OSTI)

    J. T. Beck

    2007-04-26T23:59:59.000Z

    This document identifies the need to establish the Calcine Disposition Project to determine and implement the final disposition of calcine including characterization, retrieval, treatment (if necessary), packaging, loading, onsite interim storage pending shipment to a repository or interim storage facility, and disposition of related facilities.

  6. Overview of NREL`s Photovoltaic Advanced R&D Project

    SciTech Connect (OSTI)

    Surek, T.

    1992-01-01T23:59:59.000Z

    The National Renewable Energy Laboratory`s (NREL`s) Photovoltaic Advanced Research and Development (PV AR & D) Project supports the US Department of Energy`s National Photovoltaics Program in assisting the development and commercialization of photovoltaics (PV) energy technology. The NREL program is implemented through in-house research and subcontracts, with over 50% of the annual budget awarded through competitive solicitations to universities, large and small businesses, and other research centers. These activities include cost-shared, multiyear, government/industry partnerships and technology initiatives. The research has resulted in a better fundamental understanding of materials, devices, and processes, the achievement of record efficiencies in nearly all PV technology areas, the identification of promising new approaches to low-cost photovoltaics, and the introduction of new PV technology products into system experiments and PV markets. This paper presents an overview of NREL`s PV AR & D Project in terms of project organization and budgets, near- and long-term project objectives, research participants, and current and future research directions. Recent progress in the in-house and subcontracted research activities is described. 4 refs.

  7. Environmental protection implementation plan

    SciTech Connect (OSTI)

    Holland, R.C.

    1998-03-01T23:59:59.000Z

    This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. SNL is committed to operating in full compliance with the letter and spirit of applicable environmental laws, regulations, and standards. Furthermore, SNL/California strives to go beyond compliance with legal requirements by making every effort practical to reduce impacts to the environment to levels as low as reasonably achievable.

  8. Environmental Protection Implementation Plan

    SciTech Connect (OSTI)

    Brekke, D.D.

    1995-11-01T23:59:59.000Z

    This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. This report focuses on the following: notification of environmental occurrences; general planning and reporting; special programs and plans; environmental monitoring program; and quality assurance and data verification.

  9. Danish Energy Authority Project Document

    E-Print Network [OSTI]

    Danish Energy Authority Project Document Implementation of the EU directive on the energy performance of buildings: Development of the Latvian Scheme for energy auditing of buildings and inspection of boilers #12;List of abbreviations DEA Danish Energy Authority EU EPB EU energy performance of buildings

  10. Semester Project Winter 2005-2006

    E-Print Network [OSTI]

    Partovi Nia, Vahid

    to illustrate the theory. 2 #12;Chapter 2 Survival models 2.1 A trivial exponential model In order to analyseSemester Project Winter 2005-2006 Survival and censored data Lefteris Samartzis Professor : A.C. Davison Assistant : Vahid Partovi Nia #12;Contents 1 Introduction 2 2 Survival models 3 2.1 A trivial

  11. NREL Smart Grid Projects

    SciTech Connect (OSTI)

    Hambrick, J.

    2012-01-01T23:59:59.000Z

    Although implementing Smart Grid projects at the distribution level provides many advantages and opportunities for advanced operation and control, a number of significant challenges must be overcome to maintain the high level of safety and reliability that the modern grid must provide. For example, while distributed generation (DG) promises to provide opportunities to increase reliability and efficiency and may provide grid support services such as volt/var control, the presence of DG can impact distribution operation and protection schemes. Additionally, the intermittent nature of many DG energy sources such as photovoltaics (PV) can present a number of challenges to voltage regulation, etc. This presentation provides an overview a number of Smart Grid projects being performed by the National Renewable Energy Laboratory (NREL) along with utility, industry, and academic partners. These projects include modeling and analysis of high penetration PV scenarios (with and without energy storage), development and testing of interconnection and microgrid equipment, as well as the development and implementation of advanced instrumentation and data acquisition used to analyze the impacts of intermittent renewable resources. Additionally, standards development associated with DG interconnection and analysis as well as Smart Grid interoperability will be discussed.

  12. Transition Implementation Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-04-24T23:59:59.000Z

    This Guide was prepared to aid in the development, planning, and implementation of requirements and activities during the transition phase at Department of Energy (DOE) facilities that have been declared or are forecast to become excess to any future mission requirements.

  13. Plans, Implementation, and Results

    Broader source: Energy.gov [DOE]

    The Bioenergy Technologies Office carries out technology research, development, and deployment through an ongoing process of planning and analysis, implementation, and review. This Web page includes links to documents that support and document the program management process, and the results and public benefits that derive from it.

  14. UNSATURATED SOIL MECHANICS IMPLEMENTATION

    E-Print Network [OSTI]

    Minnesota, University of

    UNSATURATED SOIL MECHANICS IMPLEMENTATION DURING PAVEMENT CONSTRUCTION QUALITY ASSURANCE Mn !! Performance Based Construction QA !! Unsaturated Soil Mechanics !! What We've Learned !! Next Steps #12.6-6.0 5 - 7 19 0.8 5 7 - 9 24 1.1 4 9 - 11 28 1.2 4 #12;Unsaturated Soil Mechanics #12;Fundamentals

  15. Adiabatically implementing quantum gates

    SciTech Connect (OSTI)

    Sun, Jie; Lu, Songfeng, E-mail: lusongfeng@hotmail.com; Liu, Fang [School of Computer Science and Technology, Huazhong University of Science and Technology, Wuhan 430074 (China)

    2014-06-14T23:59:59.000Z

    We show that, through the approach of quantum adiabatic evolution, all of the usual quantum gates can be implemented efficiently, yielding running time of order O(1). This may be considered as a useful alternative to the standard quantum computing approach, which involves quantum gates transforming quantum states during the computing process.

  16. Magnesium Projects

    Broader source: Energy.gov (indexed) [DOE]

    cyberinfrastructure projects and will be augmented by original research in Computer Science and Software Engineering towards the creation of large, distributed, autonomic and...

  17. Project Construction

    Broader source: Energy.gov [DOE]

    Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule.

  18. Status Update on Action 2a: Implementation Handbook for Activity-level Work Planning and Control

    Broader source: Energy.gov [DOE]

    Slide Presentation by James Winter, NA-00-10. DOE Handbook: Implementing Activity-Level Work Planning & Control at Nuclear Facilities. Project Justification Statement submitted 1-29-13, with focus upon improved implementation of WP&C and activity-level work. Provides the background, project plan, and key elements of a new DOE handbook on implementing activity-level work planning and control at DOE nuclear facilities.

  19. Recycling and composting demonstration projects for the Memphis region

    SciTech Connect (OSTI)

    Muller, D. [Memphis and Shelby County Div. of Planning and Development, TN (United States)

    1992-05-01T23:59:59.000Z

    This report documents the development and implementation of the project entitled ``Recycling and Composting Demonstration Projects for the Memphis Region.`` The project was funded by the Energy Task Force of the Urban Consortium for Technology Initiatives. This Project was implemented by the staff of the Special Programs Section of the Memphis and Shelby County Division of Planning and Development. The project began November 1, 1990, and was completed December 31, 1991. The purpose of the project was to evaluate the feasibility of a variety of solid waste disposal alternatives.

  20. Recycling and composting demonstration projects for the Memphis region

    SciTech Connect (OSTI)

    Muller, D. (Memphis and Shelby County Div. of Planning and Development, TN (United States))

    1992-05-01T23:59:59.000Z

    This report documents the development and implementation of the project entitled Recycling and Composting Demonstration Projects for the Memphis Region.'' The project was funded by the Energy Task Force of the Urban Consortium for Technology Initiatives. This Project was implemented by the staff of the Special Programs Section of the Memphis and Shelby County Division of Planning and Development. The project began November 1, 1990, and was completed December 31, 1991. The purpose of the project was to evaluate the feasibility of a variety of solid waste disposal alternatives.

  1. Small Business Administration Recovery Act Implementation | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Small Business Administration Recovery Act Implementation Small Business Administration Recovery Act Implementation Small Business Administration Recovery Act Implementation Small...

  2. National Conference of State Legislatures Geothermal Project. Final report, February 1978--September 1982

    SciTech Connect (OSTI)

    None

    1983-01-31T23:59:59.000Z

    The principal objectives of the NCSL Geothermal Project was to stimulate and assist state legislative action to encourage the efficient development of geothermal resources, including the use of groundwater heat pumps. The project had the following work tasks: (1) initiate state geothermal policy reviews; (2) provide technical assistance to state geothermal policy reviews; (3) serve as liaison with geothermal community; and (4) perform project evaluation.

  3. Fiscalini Farms Biomass Energy Project

    SciTech Connect (OSTI)

    William Stringfellow; Mary Kay Camarillo; Jeremy Hanlon; Michael Jue; Chelsea Spier

    2011-09-30T23:59:59.000Z

    In this final report describes and documents research that was conducted by the Ecological Engineering Research Program (EERP) at the University of the Pacific (Stockton, CA) under subcontract to Fiscalini Farms LP for work under the Assistance Agreement DE-EE0001895 'Measurement and Evaluation of a Dairy Anaerobic Digestion/Power Generation System' from the United States Department of Energy, National Energy Technology Laboratory. Fiscalini Farms is operating a 710 kW biomass-energy power plant that uses bio-methane, generated from plant biomass, cheese whey, and cattle manure via mesophilic anaerobic digestion, to produce electricity using an internal combustion engine. The primary objectives of the project were to document baseline conditions for the anaerobic digester and the combined heat and power (CHP) system used for the dairy-based biomass-energy production. The baseline condition of the plant was evaluated in the context of regulatory and economic constraints. In this final report, the operation of the plant between start-up in 2009 and operation in 2010 are documented and an interpretation of the technical data is provided. An economic analysis of the biomass energy system was previously completed (Appendix A) and the results from that study are discussed briefly in this report. Results from the start-up and first year of operation indicate that mesophilic anaerobic digestion of agricultural biomass, combined with an internal combustion engine, is a reliable source of alternative electrical production. A major advantage of biomass energy facilities located on dairy farms appears to be their inherent stability and ability to produce a consistent, 24 hour supply of electricity. However, technical analysis indicated that the Fiscalini Farms system was operating below capacity and that economic sustainability would be improved by increasing loading of feedstocks to the digester. Additional operational modifications, such as increased utilization of waste heat and better documentation of potential of carbon credits, would also improve the economic outlook. Analysis of baseline operational conditions indicated that a reduction in methane emissions and other greenhouse gas savings resulted from implementation of the project. The project results indicate that using anaerobic digestion to produce bio-methane from agricultural biomass is a promising source of electricity, but that significant challenges need to be addressed before dairy-based biomass energy production can be fully integrated into an alternative energy economy. The biomass energy facility was found to be operating undercapacity. Economic analysis indicated a positive economic sustainability, even at the reduced power production levels demonstrated during the baseline period. However, increasing methane generation capacity (via the importation of biomass codigestate) will be critical for increasing electricity output and improving the long-term economic sustainability of the operation. Dairy-based biomass energy plants are operating under strict environmental regulations applicable to both power-production and confined animal facilities and novel approached are being applied to maintain minimal environmental impacts. The use of selective catalytic reduction (SCR) for nitrous oxide control and a biological hydrogen sulfide control system were tested at this facility. Results from this study suggest that biomass energy systems can be compliant with reasonable scientifically based air and water pollution control regulations. The most significant challenge for the development of biomass energy as a viable component of power production on a regional scale is likely to be the availability of energy-rich organic feedstocks. Additionally, there needs to be further development of regional expertise in digester and power plant operations. At the Fiscalini facility, power production was limited by the availability of biomass for methane generation, not the designed system capacity. During the baseline study period, feedstocks included manure, sudan grass silage, and

  4. A Study to Develop an Industrial-Scale, Computer-Controlled High Magnetic Field Processing (HMFP) System to Assist in Commercializing the Novel, Enabling HMFP Manufacturing Technology

    SciTech Connect (OSTI)

    Lutdka, G. M.; Chourey, A. (American Magnetics, Inc.)

    2010-05-12T23:59:59.000Z

    As the original magnet designer and manufacturer of ORNLs 9T, 5-inch ID bore magnet, American Magnetics Inc. (AMI) has collaborated with ORNLs Materials Processing Groups and this partnership has been instrumental in the development of our unique thermo-magnetic facilities and expertise. Consequently, AMI and ORNL have realized that the commercial implementation of the High Magnetic Field Processing (HMFP) technology will require the evolution of robust, automated superconducting (SC) magnet systems that will be cost-effective and easy to operate in an industrial environment. The goal of this project and CRADA is to significantly expedite the timeline for implementing this revolutionary and pervasive cross-cutting technology for future US produced industrial components. The successful completion of this project is anticipated to significantly assist in the timely commercialization and licensing of our HMFP intellectual property for a broad spectrum of industries; and to open up a new market for AMI. One notable outcome of this project is that the ThermoMagnetic Processing Technology WON a prestigious 2009 R&D 100 Awards. This award acknowledges and recognizes our TMP Technology as one of the top 100 innovative US technologies in 2009. By successfully establishing the design requirements for a commercial scale magnetic processing system, this project effort has accomplished a key first step in facilitating the building and demonstration of a superconducting magnetic processing coil, enabling the transition of the High Magnetic Field Processing Technology beyond a laboratory novelty into a commercially viable and industrially scalable Manufacturing Technology.

  5. The Aurora and Medusa Projects Stan Zdonik

    E-Print Network [OSTI]

    Gummadi, Ramakrishna

    The Aurora and Medusa Projects Stan Zdonik Brown University sbz@cs.brown.edu Michael Stonebraker. The Aurora project being implemented at Brown and Brandeis under the direction of U?? gur C? etintemel, Mitch to maximize quality of service for connecting applications. A further goal of Aurora is to extend this engine

  6. The Aurora and Medusa Projects Stan Zdonik

    E-Print Network [OSTI]

    Balazinska, Magdalena

    The Aurora and Medusa Projects Stan Zdonik Brown University sbz@cs.brown.edu Michael Stonebraker. The Aurora project being implemented at Brown and Brandeis under the direction of Ugur C¸ etintemel, Mitch to maximize quality of service for connecting applications. A further goal of Aurora is to extend this engine

  7. Waste management project technical baseline description

    SciTech Connect (OSTI)

    Sederburg, J.P.

    1997-08-13T23:59:59.000Z

    A systems engineering approach has been taken to describe the technical baseline under which the Waste Management Project is currently operating. The document contains a mission analysis, function analysis, requirement analysis, interface definitions, alternative analysis, system definition, documentation requirements, implementation definitions, and discussion of uncertainties facing the Project.

  8. Position Description Project Manager, Office of Community and Economic Development

    E-Print Network [OSTI]

    Position Description Project Manager, Office of Community and Economic Development Full will support all aspects of the success of CSU's Office of Community and Economic Development projects from to the Director and Assistant Director of the Community and Economic Development Office of Colorado State

  9. Who is Going to Mentor Newcomers in Open Source Projects?

    E-Print Network [OSTI]

    Di Penta, Massimiliano

    Who is Going to Mentor Newcomers in Open Source Projects? Gerardo Canfora1 , Massimiliano Di Penta1 Assistant) aimed at iden- tifying and recommending mentors in software projects by mining data from mailing lists and versioning systems. Can- didate mentors are identified among experienced developers who

  10. PROJECTS IMPLEMENTED The City focused on improving the efficiency of

    E-Print Network [OSTI]

    Replacing incandescent exit signs with new light emitting diode signs Replacing the existing chiller

  11. Implementing CDM projects Guidebook to Host Country Legal Issues

    E-Print Network [OSTI]

    University of Denmark, or Baker & McKenzie. This report is intended as a public resource for stakeholders undertaking activities that reduce greenhouse gas emissions, whether under the Kyoto Protocol's Clean Development Mechanism or other market-based instruments for carbon trading. While this guidebook provides

  12. Celanese Chemicals Clear Lake Plant Energy Projects Assessment and Implementation

    E-Print Network [OSTI]

    Weber, J.

    gas use, and electricity use. Some involved capital changes, but most used existing assets more effectively. Celanese now realizes cost savings while operating a more efficient and reliable plant....

  13. Greenerways Project Implementation of a Sustainable Development Strategy

    E-Print Network [OSTI]

    emission data. Introduction of policies to reduce energy consumption in Forestry Commission buildings. To reduce energy consumption from office accommodation by 3% year on year in support of government skips were filled), collated information on energy consumption, calculated the office's carbon footprint

  14. Increase Productivity - Implement Energy Management Systems with Project Management Techniques

    E-Print Network [OSTI]

    Spinner, M. P.

    1984-01-01T23:59:59.000Z

    Engineering Manager of this small but active division, I devote a big part of my time on justifying energy expenditures and the means to reduce these costs. Ten years ago energy costs were one tenth of today's costs and just about three percent of the division...

  15. Recently Completed and Implemented Projects Delaware Center for Transportation

    E-Print Network [OSTI]

    Firestone, Jeremy

    ...........................................................................................................................................3 Long-Term Performance Monitoring of a Recycled Tire Embankment in Wilmington, DE..........................5 Scrap Tire Engineering & Environmental Evaluation

  16. Increase Productivity - Implement Energy Management Systems with Project Management Techniques

    E-Print Network [OSTI]

    Spinner, M. P.

    1984-01-01T23:59:59.000Z

    The Glass Division is the second smallest of Ford Motor Company's 20 odd major divisions. It employs four percent of Ford's people, uses but one and one-half percent of the manufacturing space yet it consumes 20 percent of the energy. As Plant...

  17. Implementation of Carbon Reduction in Capital Projects Introduction

    E-Print Network [OSTI]

    Chittka, Lars

    spin off companies); new plant and equipment (e.g. boiler and heating plant, electrical infrastructure with the following mandatory inclusions: a. All domestic hot water shall be delivered through solar or geothermal

  18. PRELIMINARY IMPLEMENTATIONS FOR THE NEW SPIRAL2 PROJECT CONTROL SYSTEM

    E-Print Network [OSTI]

    Boyer, Edmond

    by a superconducting linac) and a rare ion production process delivering the beam either to a low energy experimental the rare ion beam either to a new low energy beam experimental area or to the existing Ganil facility at 88.05 MHz; the Linac is composed of two beta quarterwave resonators families:12 =0,07 modules

  19. Energy Efficiency Projects: Overcoming Internal Barriers to Implementation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the YouTube|6721 Federal RegisterHydrogen andResiliencyDepartment of Energy

  20. Energy Efficiency Projects: Overcoming Internal Barriers to Implementation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the YouTube|6721 Federal RegisterHydrogen andResiliencyDepartment of Energy| Department

  1. Best-In-Class Project Management Initiative Corporate Implementation Plan |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The FutureCommentsEnergy Christopher| DepartmentofofDepartment of Energy

  2. Best-in-Class Project Management Initiative Corporate Implementation Plan

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently20,000 RussianBy:WhetherNovember 13, 2009OakDepartment ofThe employmentRequests

  3. Federal Renewable Energy Project Planning and Implementation | Department

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO2: FinalOffers New Training on Energy6 Federal Energy1999;Federal Registerof Energy

  4. Creating a Climate for Successful Project Implementation | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the YouTube platformBuildingCoalComplex(GC-72)Columbia Government |Energy Creating a

  5. Creating a Climate for Successful Project Implementation | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: Theof"Wave theJuly 30,Crafty Gifts for the Energy Conscious Crafty

  6. Tribal Renewable Energy Webinar on Project Implementation and Operations &

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently AskedEnergyIssuesEnergyTransportation Work Package|Departmentthe Headwinds

  7. Preparing for Project Implementation Assigning Accountability for Each

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreakingMay 2015 < prev next > Sun Mon2015 |July 14, 2010 8 - Preparing

  8. Preparing for Project Implementation Measuring Energy Achievements, September 8, 2010

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreakingMay 2015 < prev next > Sun Mon2015 |July 14, 2010 8 -September 8, 2010

  9. Preparing for Project Implementation after an Energy Assessment |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreakingMay 2015 < prev next > Sun Mon2015 |July 14, 2010 8 -September

  10. Preparing for Project Implementation before an Energy Assessment |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreakingMay 2015 < prev next > Sun Mon2015 |July 14, 2010 8 -SeptemberMarch

  11. Preparing for Project Implementation during an Energy Assessment |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreakingMay 2015 < prev next > Sun Mon2015 |July 14, 2010 8

  12. Preparing for Project Implementation: Providing Rewards and Recognition

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreakingMay 2015 < prev next > Sun Mon2015 |July 14, 2010 8February 10,

  13. Tribal Renewable Energy Webinar on Project Implementation and Operations &

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOriginEducationVideoStrategic|IndustrialCenterMarch 4; RSVP by Feb. 27Solar Tribalthe

  14. Energy Efficiency Projects: Overcoming Internal Barriers to Implementation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:RevisedAdvisoryStandard |in STEMEnergyI. IntroductionDepartment of| Department

  15. Integrated Project Team Guide for Formation and Implementation - DOE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHigh SchoolIn Other NewsSpin andInterim Data Changes PerformanceDirectives,

  16. West Virginia Smart Grid Implementation Plan (WV SGIP) Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over OurThe Iron SpinPrincetonUsing Maps1DOETHEWeekly ReportsWenjun DengWest ValleyWV

  17. West Virginia Smart Grid Implementation Plan (WV SGIP) Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over OurThe Iron SpinPrincetonUsing Maps1DOETHEWeekly ReportsWenjun DengWest ValleyWV

  18. Solar Schools Assessment and Implementation Project: Financing Options on

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOriginEducationVideo »UsageSecretary ofSmallConfidential,2 SolarSolarEnergySolarSBSolar

  19. Motivating Employees to Implement Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreaking ofOil &315_ArnibanPriorityof EnergyDepartment ofRobertRefinery

  20. Implementing MSE 2000: Procedures

    E-Print Network [OSTI]

    Brown, M.; Adams, J.

    experts, technical writers, and subject matter experts, who will not continue on the MSE team. These experts fill a need when the management system is initiated that is completed during the implementation phase. Select MSE Team After... represent the most effective and efficient practice. By including technical writers and subject matter experts on the team, procedure/instruction writing will be hastened and enhanced. SYSTEM APPRAISAL During the system appraisal phase, the MSE 2000...

  1. Implementation of Sustainability at

    E-Print Network [OSTI]

    Johansen, Tom Henning

    0 Assessing Implementation of Sustainability at UiO Grnt UiO S u s t a i n a b i l i t y i n R e sustainability commitment among universities and proposed Best Green University Practices in 2010. It presents the current status of UiO Environmental Sustainability. #12;1 If you cannot measure it, you cannot manage it

  2. From Requirements to Implementations

    E-Print Network [OSTI]

    Pnueli, Amir

    research project, 1995--1998. ffl Participants Industrial Partners British Aerospace Siemens Snecma -- A French jet­engine manufacturer Tool Vendors I­Logix U.K. SNI -- Siemens Nixdorf Information Systems TNI -- A highly optimizing reconfigurable­ architecture driven compiler (e.g. Trimaran) transforming C

  3. LANL, Sandia celebrate success at New Mexico Small Business Assistance...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    success at NM Small Business Assistance fest LANL, Sandia celebrate success at New Mexico Small Business Assistance fest The New Mexico Small Business Assistance (NMSBA)...

  4. assistance program personnel: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Medical Escort Services ** Repatriation of Remains ** Replacement of Medication or Eyeglasses EmergencyOverview of Emergency Travel Assistance TRAVEL ASSISTANCE The Team Assist...

  5. assistants essential tools: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Medical Escort Services ** Repatriation of Remains ** Replacement of Medication or Eyeglasses EmergencyOverview of Emergency Travel Assistance TRAVEL ASSISTANCE The Team Assist...

  6. Assistant Director, Prospect Management Description

    E-Print Network [OSTI]

    Portman, Douglas

    and to the Prospect Management Data Wranglers to assist their efforts in improving the quality of Prospect Management Management Enter and monitor prospect assignments and new prospect records requests. Monitor data quality of all functions and systems related to prospect management, including software applications, industry

  7. New Mexico Small Business Assistance

    E-Print Network [OSTI]

    New Mexico Small Business Assistance Program (NMSBA) helps small businesses in New Mexico access counties solve their technical challenges through NMSBA. Economic Impact of the Small Businesses related to NMSBA Small Business Jobs Created/Retained 2,874 Average Salary $38,647 Increased Revenue $145.2M

  8. Laura M. Grabowski Assistant Professor

    E-Print Network [OSTI]

    Grabowski, Laura M. - Department of Computer Science, University of Texas

    " Advisor: Dr. Richard Fowler MASTER OF ARTS May 1983 Communications/Theatre Bowling Green State University Committee Chair BACHELOR OF ARTS June 1980 Major: French; Minor: Dance Bowling Green State University Department of Theatre Bowling Green State University, Bowling Green, Ohio Graduate Teaching Assistant August

  9. Obtaining Disaster Assistance for Public Infrastructure

    E-Print Network [OSTI]

    Taylor, Greg

    2005-10-10T23:59:59.000Z

    County and municipal governments, as well as certain private non-profit organizations, may qualify for assistance in rebuilding public infrastructure after a natural disaster. This leaflet details the assistance programs available from the Federal...

  10. Assistant Secretary Hoffman Discusses Grid Modernization with...

    Broader source: Energy.gov (indexed) [DOE]

    Assistant Secretary Hoffman Discusses Grid Modernization with the New York Times and E&E TV Assistant Secretary Hoffman Discusses Grid Modernization with the New York Times and E&E...

  11. Job Position Description Job Title: Office Assistant

    E-Print Network [OSTI]

    Moore, Paul A.

    Job Position Description Job Title: Office Assistant A. Main purpose of the job: To assist of Campus Operations. B. Primary responsibilities or key duties of the job (tasks performed regularly

  12. Job Position Description Job Title: Locksmith Assistant

    E-Print Network [OSTI]

    Moore, Paul A.

    Job Position Description Job Title: Locksmith Assistant A. Main purpose of the job: Assist responsibilities or key duties of the job (tasks performed regularly): 1. Perform lock changes in all facilities

  13. Project Manager

    Broader source: Energy.gov [DOE]

    A successful candidate in this position will serve as a project manager in the Fuel Cell Technologies Office in the DOE-EERE Office of Transportation responsible for a wide variety of highly...

  14. RENOTER Project

    Broader source: Energy.gov [DOE]

    Overview of French project on thermoelectric waste heat recovery for cars and trucks with focus on cheap, available, efficient, and sustainable TE materials, as well as efficient material integration and production process.

  15. Preparing for Project Implementation: Providing Resources for Implementation, May 12, 2010

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreakingMay 2015 < prev next > Sun Mon2015 |July 14, 2010 8February 10, 2010

  16. Radiological Assistance Program | National Nuclear Security Administra...

    National Nuclear Security Administration (NNSA)

    Federal Radiological Monitoring and Assessment Center Emergency Response Accident Response Group Radiation Emergency Assistance Center Training Site National Atmospheric Release...

  17. ORISE: Policy Implementation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)Integrated CodesTransparencyDOENurse Triage Lines SupportPolicy Implementation The Oak

  18. Implementing Bayesian Statistics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHigh School footballHydrogenIT |HotImpact ofVisiting Us /Implementing

  19. Implementing HB 3672

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHigh School footballHydrogenIT |HotImpact ofVisiting Us /ImplementingOregon

  20. WARREN RESIDENTIAL LIFE RESIDENT ASSISTANT POSITION DESCRIPTION

    E-Print Network [OSTI]

    Russell, Lynn

    WARREN RESIDENTIAL LIFE RESIDENT ASSISTANT POSITION DESCRIPTION The position of Resident Assistant for students living within the Warren College residential community. Resident Assistant's (RA's) are principle members of the Warren Residential Life staff. In accordance with the University of California's Personnel

  1. Framework for Project Development in the Renewable Energy Sector

    SciTech Connect (OSTI)

    Springer, R.

    2013-02-01T23:59:59.000Z

    The concepts, descriptions, diagrams, and acronyms developed and described herein are meant to provide a contextual framework as well as a systematic, repeatable process to assist a potential project sponsor in understanding and navigating early-stage project development. Professional project developers will recognize these concepts and hold them as intuitive and even obvious, though the fundamentals of this specialized field are rarely written down and defined as they are here.

  2. Support services for the Weatherization Assistance Program opportunity grants: Final technical report

    SciTech Connect (OSTI)

    Not Available

    1987-11-15T23:59:59.000Z

    The Energy-Related Business Development Project was designed by the US Department of Energy Weatherization Assistance Program (DOE/WAP) to promote activities which demonstrate strategies for providing weatherization services without Federal Funds or which promote energy-related business development activities. In December 1985, 38 community action agencies were selected through a competition grant process to participate in this demonstration project. The purpose of this project was to provide training and technical assistance to the selected grantees - to help them develop skills in business development through the identification and evaluation of potential and existing local agency energy-related ventures. This project provided support for grantees to research and package energy-related business plans capable of receiving outside financing.

  3. Selection of water treatment processes special study. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect (OSTI)

    Not Available

    1991-11-01T23:59:59.000Z

    Characterization of the level and extent of groundwater contamination in the vicinity of Title I mill sites began during the surface remedial action stage (Phase 1) of the Uranium Mill Tailings Remedial Action (UMTRA) Project. Some of the contamination in the aquifer(s) at the abandoned sites is attributable to milling activities during the years the mills were in operation. The restoration of contaminated aquifers is to be undertaken in Phase II of the UMTRA Project. To begin implementation of Phase II, DOE requested that groundwater restoration methods and technologies be investigated by the Technical Assistance Contractor (TAC). and that the results of the TAC investigations be documented in special study reports. Many active and passive methods are available to clean up contaminated groundwater. Passive groundwater treatment includes natural flushing, geochemical barriers, and gradient manipulation by stream diversion or slurry walls. Active groundwater.cleanup techniques include gradient manipulation by well extraction or injection. in-situ biological or chemical reclamation, and extraction and treatment. Although some or all of the methods listed above may play a role in the groundwater cleanup phase of the UMTRA Project, the extraction and treatment (pump and treat) option is the only restoration alternative discussed in this report. Hence, all sections of this report relate either directly or indirectly to the technical discipline of process engineering.

  4. GPFS HPSS Integration: Implementation Experience

    E-Print Network [OSTI]

    Hazen, Damian

    2008-01-01T23:59:59.000Z

    1996). Data Management API: the standard and implementationManagement (XDSM) API. Technical Standard. Open Group CAE

  5. Human Resources Organizational Readiness Project Over the past 18 months, hundreds of employees from across the University brought their institutional

    E-Print Network [OSTI]

    Finzi, Adrien

    Human Resources Organizational Readiness Project Over the past 18 months, hundreds of employees implement SAP. What is the Human Resources Organizational Readiness Project? In preparation for the BUworks Program, the Human Resources Organizational Readiness Project will collect, organize and standardize

  6. Environmental Assessment Lakeview Geothermal Project

    SciTech Connect (OSTI)

    Treis, Tania

    2012-04-30T23:59:59.000Z

    The Town of Lakeview is proposing to construct and operate a geothermal direct use district heating system in Lakeview, Oregon. The proposed project would be in Lake County, Oregon, within the Lakeview Known Geothermal Resources Area (KGRA). The proposed project includes the following elements: ï?· Drilling, testing, and completion of a new production well and geothermal water injection well ï?· Construction and operation of a geothermal production fluid pipeline from the well pad to various Town buildings (i.e., local schools, hospital, and Lake County Industrial Park) and back to a geothermal water injection well This EA describes the proposed project, the alternatives considered, and presents the environmental analysis pursuant to the National Environmental Policy Act. The project would not result in adverse effects to the environment with the implementation of environmental protection measures.

  7. Guidebook for Six Sigma Implementation

    E-Print Network [OSTI]

    Bandyopadhyay, Antar

    Guidebook for Six Sigma Implementation with Real Time Applications Editorial Committee Chairman: Dr & QUALITY COUNCIL OF INDIA A unique book on Six sigma implementation strategy with Real time case studies Now available !!! Now available !!! #12;Guidebook for Six Sigma Implementation with Real Time

  8. assisted reproductive technology: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    consumer information. Referral Date: Consumer's Name: Date of Birth Assistive Technology Assessment Computer Skills Assessment Assistive TechnologyComputer...

  9. assisted reproduction technology: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    consumer information. Referral Date: Consumer's Name: Date of Birth Assistive Technology Assessment Computer Skills Assessment Assistive TechnologyComputer...

  10. assisted reproduction technologies: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    consumer information. Referral Date: Consumer's Name: Date of Birth Assistive Technology Assessment Computer Skills Assessment Assistive TechnologyComputer...

  11. Office of the Assistant General Counsel for Procurement and Financial...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Financial Assistance Regulations: Federal Acquisition Regulation Department of Energy Acquisition Regulation Department of Energy Financial Assistance Regulations Office...

  12. Computer Assisted Parallel Program Generation

    E-Print Network [OSTI]

    Kawata, Shigeo

    2015-01-01T23:59:59.000Z

    Parallel computation is widely employed in scientific researches, engineering activities and product development. Parallel program writing itself is not always a simple task depending on problems solved. Large-scale scientific computing, huge data analyses and precise visualizations, for example, would require parallel computations, and the parallel computing needs the parallelization techniques. In this Chapter a parallel program generation support is discussed, and a computer-assisted parallel program generation system P-NCAS is introduced. Computer assisted problem solving is one of key methods to promote innovations in science and engineering, and contributes to enrich our society and our life toward a programming-free environment in computing science. Problem solving environments (PSE) research activities had started to enhance the programming power in 1970's. The P-NCAS is one of the PSEs; The PSE concept provides an integrated human-friendly computational software and hardware system to solve a target ...

  13. Clean Coal Technology Programs: Completed Projects (Volume 2)

    SciTech Connect (OSTI)

    Assistant Secretary for Fossil Energy

    2003-12-01T23:59:59.000Z

    Annual report on the Clean Coal Technology Demonstration Program (CCTDP), Power Plant Improvement Initiative (PPII), and Clean Coal Power Initiative (CCPI). The report addresses the roles of the programs, implementation, funding and costs, project descriptions, legislative history, program history, environmental aspects, and project contacts. The project descriptions describe the technology and provides a brief summary of the demonstration results.

  14. Assistive Devices for the Home

    E-Print Network [OSTI]

    Harris, Janie

    2002-01-31T23:59:59.000Z

    , contact a physical therapist or occupational therapist through a home health agency or your local hospital. The following Web sites have information about devices that can make your home safer and more functional: http...Assistive Devices for the Home Janie Harris Extension Specialist, Housing and Environment The Texas A&M University System If you were to become impaired or disabled from an accident or illness, how ?user-friendly? would your home be? There are many...

  15. DESIGN AND IMPLEMENTATION OF A CO2 FLOOD UTILIZING ADVANCED RESERVOIR CHARACTERIZATION AND HORIZONTAL INJECTION WELLS IN A SHALLOW SHELF CARBONATE APPROACHING WATERFLOOD DEPLETION

    SciTech Connect (OSTI)

    K.J. Harpole; Ed G. Durrett; Susan Snow; J.S. Bles; Carlon Robertson; C.D. Caldwell; D.J. Harms; R.L. King; B.A. Baldwin; D. Wegener; M. Navarrette

    2002-09-01T23:59:59.000Z

    The purpose of this project was to economically design an optimum carbon dioxide (CO{sub 2}) flood for a mature waterflood nearing its economic abandonment. The original project utilized advanced reservoir characterization and CO{sub 2} horizontal injection wells as the primary methods to redevelop the South Cowden Unit (SCU). The development plans; project implementation and reservoir management techniques were to be transferred to the public domain to assist in preventing premature abandonment of similar fields. The Unit was a mature waterflood with water cut exceeding 95%. Oil must be mobilized through the use of a miscible or near-miscible fluid to recover significant additional reserves. Also, because the unit was relatively small, it did not have the benefit of economies of scale inherent in normal larger scale projects. Thus, new and innovative methods were required to reduce investment and operating costs. Two primary methods used to accomplish improved economics were use of reservoir characterization to restrict the flood to the higher quality rock in the unit and use of horizontal injection wells to cut investment and operating costs. The project consisted of two budget phases. Budget Phase I started in June 1994 and ended late June 1996. In this phase Reservoir Analysis, Characterization Tasks and Advanced Technology Definition Tasks were completed. Completion enabled the project to be designed, evaluated, and an Authority for Expenditure (AFE) for project implementation submitted to working interest owners for approval. Budget Phase II consisted of the implementation and execution of the project in the field. Phase II was completed in July 2001. Performance monitoring, during Phase II, by mid 1998 identified the majority of producing wells which under performed their anticipated withdrawal rates. Newly drilled and re-activated wells had lower offtake rates than originally forecasted. As a result of poor offtake, higher reservoir pressure was a concern for the project as it limited CO{sub 2} injectivity. To reduce voidage balance, and reservoir pressure, a disposal well was therefore drilled. Several injection surveys indicated the CO{sub 2} injection wells had severe conformance issues. After close monitoring of the project to the end of 1999, it was evident the project would not recover the anticipated tertiary reserves. The main reasons for under-performance were poor in zone CO{sub 2} injection into the upper San Andres layers, poorer offtake rates from newly drilled replacement wells and a higher than required reservoir pressure. After discussion internally within Phillips, externally with the Department of Energy (DOE) and SCU partners, a redevelopment of South Cowden was agreed upon to commence in year 2000. The redevelopment essentially abandoned the original development for Budget Phase II in favor of a revised approach. This involved conformance techniques to resolve out of zone CO{sub 2} injection and use of horizontal wells to improve in zone injectivity and productivity. A phased approach was used to ensure short radius lateral drilling could be implemented effectively at South Cowden. This involved monitoring drilling operations and then production response to determine if larger investments during the second phase were justified. Redevelopment Phase 1 was completed in May 2000. It was deemed a success in regard to finding suitable/cost-effective technology for drilling horizontal laterals and finding a technique that could sustain long-term productivity from the upper layers of the San Andres reservoir. Four existing vertical producing wells were isolated from their existing completions and sidetracked with horizontal laterals into the upper layers of the San Andres. Overall average offtake rates for the four wells increased by a factor of 12 during the first four months after completion of Phase 1. Phase 2 of the redevelopment focused on current CO{sub 2} vertical injection wells. Techniques were applied to resolve near well conformance concerns and then either single or dual laterals were dril

  16. Environmental Restoration Program pollution prevention checklist guide for the facility characterization project phase

    SciTech Connect (OSTI)

    Not Available

    1993-09-01T23:59:59.000Z

    A facility characterization (FC) is conducted to determine the nature and extent contamination at a potential hazardous facility waste site. The information gathered during an FC includes (1) data on the volume and chemical nature of the waste, (2) information on the extent of contamination and the migration potential of the contaminants, (3) preliminary information on evaluation of alternative concepts that can or cannot be considered, and (4)supportive technical and cost data. For the purposes of identification, the following operational phases will be used for definition for this phase of the decommissioning and decontamination process (1) facility characterization before clean up, (2) characterization during clean up, (3) characterization of waste materials, and (4) site characterization after clean up. A key consideration in this process is the prevention of any waste to be generated from these characterization activities. The purpose of this checklist guide is to assist users with incorporating pollution prevention/waste minimization (PP/WM) in all FC phase projects of the Environmental Restoration (ER) Program. This guide will help users document PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to assist users with implementing and evaluating waste reduction.

  17. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1993-03-15T23:59:59.000Z

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  18. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1993-03-15T23:59:59.000Z

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  19. Hualapai Wind Project Feasibility Report

    SciTech Connect (OSTI)

    Davidson, Kevin [Hualapai Tribe] [Hualapai Tribe; Randall, Mark [Daystar Consulting] [Daystar Consulting; Isham, Tom [Power Engineers] [Power Engineers; Horna, Marion J [MJH Power Consulting LLC] [MJH Power Consulting LLC; Koronkiewicz, T [SWCA Environmental, Inc.] [SWCA Environmental, Inc.; Simon, Rich [V-Bar, LLC] [V-Bar, LLC; Matthew, Rojas [Squire Sanders Dempsey] [Squire Sanders Dempsey; MacCourt, Doug C. [Ater Wynne, LLP] [Ater Wynne, LLP; Burpo, Rob [First American Financial Advisors, Inc.] [First American Financial Advisors, Inc.

    2012-12-20T23:59:59.000Z

    The Hualapai Department of Planning and Economic Development, with funding assistance from the U.S. Department of Energy, Tribal Energy Program, with the aid of six consultants has completed the four key prerequisites as follows: 1. Identify the site area for development and its suitability for construction. 2. Determine the wind resource potential for the identified site area. 3. Determine the electrical transmission and interconnection feasibility to get the electrical power produced to the marketplace. 4. Complete an initial permitting and environmental assessment to determine the feasibility for getting the project permitted. Those studies indicated a suitable wind resource and favorable conditions for permitting and construction. The permitting and environmental study did not reveal any fatal flaws. A review of the best power sale opportunities indicate southern California has the highest potential for obtaining a PPA that may make the project viable. Based on these results, the recommendation is for the Hualapai Tribal Nation to move forward with attracting a qualified wind developer to work with the Tribe to move the project into the second phase - determining the reality factors for developing a wind project. a qualified developer will bid to a utility or negotiate a PPA to make the project viable for financing.

  20. DIGITAL ARCHITECTURE PROJECT PLAN

    SciTech Connect (OSTI)

    Thomas, Ken

    2014-09-01T23:59:59.000Z

    The objective of this project is to develop an industry consensus document on how to scope and implement the underlying information technology infrastructure that is needed to support a vast array of real-time digital technologies to improve NPP work efficiency, to reduce human error, to increase production reliability and to enhance nuclear safety. A consensus approach is needed because: There is currently a wide disparity in nuclear utility perspectives and positions on what is prudent and regulatory-compliant for introducing certain digital technologies into the plant environment. For example, there is a variety of implementation policies throughout the industry concerning electromagnetic compatibility (EMC), cyber security, wireless communication coverage, mobile devices for workers, mobile technology in the control room, and so forth. There is a need to effectively share among the nuclear operating companies the early experience with these technologies and other forms of lessons-learned. There is also the opportunity to take advantage of international experience with these technologies. There is a need to provide the industry with a sense of what other companies are implementing, so that each respective company can factor this into their own development plans and position themselves to take advantage of new work methods as they are validated by the initial implementing companies. In the nuclear power industry, once a better work practice has been proven, there is a general expectation that the rest of the industry will adopt it. However, the long-lead time of information technology infrastructure could prove to be a delaying factor. A secondary objective of this effort is to provide a general understanding of the incremental investment that would be required to support the targeted digital technologies, in terms of an incremental investment over current infrastructure. This will be required for business cases to support the adoption of these new technologies.